Molecular cloning and characterisation of a pathogenesis-related protein CsPR10 from Crocus sativus.
Gómez-Gómez, L; Rubio-Moraga, A; Ahrazem, O
2011-03-01
Plants have developed many mechanisms to protect themselves against most potential microbial pathogens and diseases. Among these mechanisms, pathogenesis-related proteins are produced as part of the active defence to prevent attack. In this study, a full-length cDNA encoding the CsPR10 protein was identified in fresh saffron stigmas (Crocus sativus). The deduced amino acid sequence from the nucleotide sequence of the coding region showed homology with PR10 proteins. The clone expressed as a protein in fusion with a GST tag produced a 47-kDa protein in E. coli. CsPR10 had ribonuclease activity, with features common to class II-type ribonucleases; its specific activity was quantified as 68.8 U·mg(-1) protein, thus falling within the range of most PR10 proteins exhibiting RNase activity. Antifungal activity of CsPR10 was assayed against Verticillium dahliae, Penicillium sp. and Fusarium oxysporum. CsPR10 inhibited only F. oxysporum growth, and antifungal potency was reflected in a IC(50) of 8.3 μm. Expression analysis showed the presence of high transcript levels in anther and tepal tissues, low levels in stigmas and roots, and no signal detected in leaves. This protein seems to be involved in the active defence response through activation of the jasmonic acid pathway. © 2010 German Botanical Society and The Royal Botanical Society of the Netherlands.
Noelle, A.; Hartmann, G. K.; Martin-Torres, F. J.
2010-05-01
The science-softCon "UV/Vis+ Spectra Data Base" is a non-profit project established in August 2000 and is operated in accordance to the "Open Access" definitions and regulations of the CSPR Assessment Panel on Scientific Data and Information (International Council for Science, 2004, HYPERLINK "http://www.science-softcon.de/spectra/cspr.pdf" ICSU Report of the CSPR Assessment Panel on Data and Information; ISBN 0-930357-60-4). The on-line database contains currently about 5600 spectra (from low to very high resolution, at different temperatures and pressures) and datasheets (metadata) of about 850 substances. Additional spectra/datasheets will be added continuously. In addition more than 250 links to on-line free available original publications are provided. The interdisciplinary of this photochemistry database provides a good interaction between different research areas. So, this database is an excellent tool for scientists who investigate on different fields such as atmospheric chemistry, astrophysics, agriculture, analytical chemistry, environmental chemistry, medicine, remote sensing, etc. To ensure the high quality standard of the fast growing UV/Vis+ Spectra Data Base an international "Scientific Advisory Group" (SAG) has been established in 2004. Because of the importance of maintenance of the database the support of the scientific community is crucial. Therefore we would like to encourage all scientists to support this data compilation project thru the provision of new or missing spectral data and information.
1980-01-01
The ASEAN Population Expert Group met in Manila and was followed by a meeting of the ASEAN heads of population programs, during the period November 5-10, 1979. Heads of population programs from Indonesia, Malaysia, Singapore, Thailand, and the Philippines attended. The meetings were held to review progress-to-date on phase 1 projects and to consider the development of an expanded population program. 5 projects funded by UNFPA are reviewed in tabular form with the project, the sponsoring country, date of implementation, data analysis, and date of completion. Suggestions were made for improving and extending these projects and it was also suggested that all projects being developed and proposed should include a section on use of research. 7 new projects were proposed as phase 2 projects. The 1st, sponsored by Malaysia, deals with women in development; project 2, lead by Thailand, will investigate population movement and its effect on development; project 3, led by the Philippines, will develop and strengthen national population information systems and networks in ASEAN countries; project 4, led by Indonesia, is directed towards institutional development and exchanges of personnel; project 5, led by the Philippines, will examine population and development dynamics and the man/resources balance; project 6, led by Thailand, will develop ASEAN social indicators; and project 7, led by Indonesia and Malaysia, will make a comprehensive analysis of existing medical/health care and family planning systems. It was recommended that an executive director of the proposed ASEAN population coordination unit should be appointed to expedite the recommendations of the meeting related to preparation and submission of phase 2 project proposals.
18 CFR 801.4 - Project review.
2010-04-01
... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Project review. 801.4 Section 801.4 Conservation of Power and Water Resources SUSQUEHANNA RIVER BASIN COMMISSION GENERAL POLICIES § 801.4 Project review. (a) The Compact provides generally that no project affecting the water...
Liang, Yifan; Du, Yingchao; Su, Xiaolu; Wang, Dan; Yan, Lixin; Tian, Qili; Zhou, Zheng; Wang, Dong; Huang, Wenhui; Gai, Wei; Tang, Chuanxiang; Konoplev, I. V.; Zhang, H.; Doucas, G.
2018-01-01
Generation of coherent Smith-Purcell (cSPr) and transition/diffraction radiation using a single bunch or a pre-modulated relativistic electron beam is one of the growing research areas aiming at the development of radiation sources and beam diagnostics for accelerators. We report the results of comparative experimental studies of terahertz radiation generation by an electron bunch and micro-bunched electron beams and the spectral properties of the coherent transition and SP radiation. The properties of cSPr spectra are investigated and discussed, and excitations of the fundamental and second harmonics of cSPr and their dependence on the beam-grating separation are shown. The experimental and theoretical results are compared, and good agreement is demonstrated.
Smoking trends among Filipino adults in California, 1990-2002.
Romero, Romina A; Messer, Karen; West, Joshua H; White, Martha M; Trinidad, Dennis R
2008-04-01
Filipinos comprise about 18% of the Asian/Pacific Islander American (APIA) population and are increasing. Few studies have examined Filipino current smoking prevalence rates (CSPR) and none have described trends over time. Trends in CSPR were estimated for Filipinos and non-Hispanic whites (NHW) from 1990-2002 from the California Tobacco Surveys (N>42,000/year). CSPR for Filipino males declined: 23.7% (95% CI: 18.7, 28.7) in 1990 to 18.7% (15.3, 22.1) in 2002 (pFilipino women was non-significant (p=0.24), 9.8% (5.5, 14.1) in 1990 and 7.7% (5.3, 10.1) in 2002. During the same period, CSPR among NHW males declined: 24.4% (23.8, 25.0) in 1990 to 18.8% (18.1, 19.4) in 2002 (pFilipinos suggest that English language use is associated with current smoking among females (pFilipino current smokers declined similarly to male NHW from 1990-2002; female rates were lower but did not decline. Future smoking prevention and cessation programs would benefit by taking into account important differences in smoking rates between genders and age groups.
75 FR 36301 - Review and Approval of Projects
2010-06-25
... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Parts 806 and 808 Review and Approval of Projects AGENCY... document contains proposed rules that would amend the project review regulations of the Susquehanna River... the scope of withdrawals requiring review and approval; improve notice procedures for all project...
77 FR 75915 - Review and Approval of Projects
2012-12-26
... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Part 806 Review and Approval of Projects AGENCY... document contains proposed rules that would amend the project review regulations of the Susquehanna River... set forth in this proposed rulemaking is to make further modifications to the Commission's project...
RPERT: Repetitive-Projects Evaluation and Review Technique
Directory of Open Access Journals (Sweden)
Remon Fayek Aziz
2014-03-01
Full Text Available Estimating expected completion probability of any repetitive construction project with a specified/certain duration including repetitive identical activities by using program evaluation and review technique is the most essential part in construction areas since the activities were had optimistic, most likely and pessimistic durations. This paper focuses on the calculation of expected completion probability of any repetitive construction project within a specified/certain duration (contract duration by using Line Of Balance technique (LOB in case of single or multiple number of crews integrated with Program Evaluation and Review Technique (PERT. Repetitive-Projects Evaluation and Review Technique (RPERT, which is a simplified software, will generate the expected project completion probability of a specified/certain duration (contract duration. RPERT software is designed by java programming code system to provide a number of new and unique capabilities, including: (1 Viewing the expected project completion probability according to a set of specified durations per each identical activity (optimistic time, most likely time, and pessimistic time in the analyzed project; (2 Providing seamless integration with available project time calculations. In order to provide the aforementioned capabilities of RPERT, the system is implemented and developed in four main modules: (1 A user interface module; (2 A database module; (3 A running module; and (4 A processing module. At the end, an illustrative example will be presented to demonstrate and verify the applications of proposed software (RPERT, by using probabilistic calculations for repetitive construction projects.
7 CFR 1486.506 - When will a project be reviewed?
2010-01-01
... 7 Agriculture 10 2010-01-01 2010-01-01 false When will a project be reviewed? 1486.506 Section... Reporting, Evaluation, and Compliance § 1486.506 When will a project be reviewed? Any project or activity... after the completion of the project. ...
Bout, Y.; Lombaers, Jaap H.M.; Constantinides, Efthymios; Fisscher, O.A.M.; de Weerd-Nederhof, Petronella C.; Oakey, R.; Groen, A.; Cook, G.; van der Sijde, P.
2009-01-01
Post-Project Reviews are mainly used as a tool to improve organisational learning (Busby, 1999; von Zedtwitz, 2002). However, post-project reviews can also be used as a tool to identify new market potential and to hand over technical knowledge from technical to marketing personnel (von Zedtwitz,
International Nuclear Information System (INIS)
Klee, H.; Podar, M.
1991-01-01
The Amoco/EPA Pollution Prevention Project involved a number of representatives from federal and Virginia regulatory agencies, and Amoco's refining business. Participants believed that the Project could benefit from a broader perspective than these organizations along might provide. The Project Work Group selected an independent Peer Review Process which was conducted by Resource for the Future (RFF), a Washington DC think tank. A group of technical, policy and environmental experts from diverse backgrounds served as Peer Review members. The Peer Review Committee met on three occasions to discuss (1) the Project Work Plan (2) sampling data and interpretation and (3) project conclusions and recommendations. The focus of the meeting was on the general scope and content of the project
Bout, L.Y.; Lombaers, J.H.M.; Constantinides, E.; Weerd-Nederhof, P.C. de
2009-01-01
Post-Project Reviews are mainly used as a tool to improve organisational learning (Busby, 1999; von Zedtwitz, 2002). However, the concept of post-project review can also be used as a tool to identify new market potential and to hand over technical knowledge from technical to marketing personnel (von
LBNL report of the vetting review of the GRETINA project
International Nuclear Information System (INIS)
Robinson, K.E.; Bercovitz, J.H.; Bieser, F.S.; Jared, R.C.; Karpenko, V.P.; Klein, S.R.; Lesko, K.T.; Rasson, J.E.; Ritter, H.G.; Tull, C.E.; Wells, R.; Wieman, H.H.
2004-01-01
GRETINA is a gamma-ray detector array capable of reconstructing the energy and spatial positions of gamma-ray interactions within the germanium crystals. It will be used to study the structure and stability of nuclei under various conditions. The new capabilities provided by gamma-ray tracking will give large gains in sensitivity for a large number of experiments, particularly those aimed at nuclei far from beta stability. A proposal for GRETINA was submitted to DOE in June 2003. It presented the scientific case, the readiness of technical development, the design, the suggested management organizations, and a proposed cost and schedule. The GRETINA proposal received its CD0 approval in August 2003. The CD-1 review will be held on December 3 and 4, 2003, and will be handled by the DOE-N. This report presents the charge to the GRETINA vetting review committee, and the findings, comments and recommendations of this committee. The purpose of this project vetting review was to assure that the GRETINA project is on track to provide DOE and the nuclear physics community with the agreed upon deliverables within the agreed upon budget and schedule. The vetting review committee was asked to cover both technical and management aspects of the GRETINA Project. Reviewers offer expert knowledge in relevant areas and provide recommendations and findings to the project's management team. Upon successful completion, the Laboratory's Integrated Project Management Office (IPMO) will recommend signoff of the project to the Laboratory Directorate. The GRETINA vetting review committee was asked to consider all relevant aspects of the project's management, project execution plan (PEP), technical approach and status, cost estimate, resources, schedule and risk and, in doing so, to advise as to whether the GRETINA Project was likely to successfully provide the agreed upon deliverables within the agreed upon budget and schedule. The review committee was asked to identify any project areas
International Nuclear Information System (INIS)
Artyomov, K P; Ryzhov, V V; Potylitsyn, A P; Sukhikh, L G
2017-01-01
Generation of coherent THz Smith-Purcell radiation by single electron bunch or multi-bunched electron beam was simulated for lamellar, sinusoidal and echelette gratings. The dependences of the CSPR intensity of the corrugation gratings depth were investigated. The angular and spectral characteristics of the CSPR for different profiles of diffraction gratings were obtained. It is shown that in the case of femtosecond multi-bunched electron beam with 10 MeV energy sinusoidal grating with period 292 μm and groove depth 60 μm has the uniform angular distribution with high radiation intensity. (paper)
Field review of fish habitat improvement projects in central Idaho
International Nuclear Information System (INIS)
Beschta, R.L.; Griffith, J.; Wesche, T.A.
1993-05-01
The goal of this field review was to provide information to the Bonneville Power Administration (BPA) regarding previous and ongoing fish habitat improvement projects in central Idaho. On July 14, 1992, the review team met at the Sawtooth National Recreation Area office near Ketchum, Idaho, for a slide presentation illustrating several habitat projects during their construction phases. Following the slide presentation, the review team inspected fish habitat projects that have been implemented in the last several years in the Stanley Basin and adjacent valleys. At each site the habitat project was described to the field team and a brief period for project inspection followed. The review team visited approximately a dozen sites on the Challis, Sawtooth, and Boise National Forests over a period of approximately two and a half days. There are two objectives of this review namely to summarize observations for specific field sites and to provide overview commentary regarding the BPA habitat improvement program in central Idaho
2011-01-01
Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721
Chang, Li-Yin; Chen, Yu-Chih; Huang, Kuang-Chi; Huang, Jui-Lan; Lee, Tso-Ying
2015-04-01
Nursing projects are a key part of N4 professional competency training for nursing personnel. Low passage rates for these projects have been shown to negatively affect the intent of nursing personnel to advance further in the nursing ladder system. This study analyzes the scores for nursing projects between 2011 and 2013, the passage rate for these projects, and the differences in passage rates between different types of projects. This retrospective and descriptive study collected data on nursing projects conducted under the auspices of the Taiwan Nurses Association between 2011 and 2013. Furthermore, the comments of reviewers on 100 nursing projects were randomly selected and subjected to content analysis. A total of 3,359 nursing projects were examined. Eliminating unqualified nursing projects left a total of 3,246 projects for the dataset. A total of 1,099 projects were scored with passing grades, giving a passing rate of 33.9%. The authors of these passing projects worked primarily in northern Taiwan, worked in medical centers, and worked in intensive care departments. The projects submitted by authors in central Taiwan had the highest average score and passing rate, while those living in offshore islands had the lowest average score and passing rate. Most of the project topics belonged to the category: "improvement of nursing service skills or quality" (77.3%). Items with the lowest scores were: validation of questions, analysis of the current situation, and evaluation of results. The topics of nursing projects did not relate significantly to passing rate. However, years of experience, geographic location of hospital, level of institution, and department each had a statistically significant impact on the passage rate. A content analysis of reviewer comments was used to extract common problems. Most of the positive comments were related to the category of "literature review and reference", while most of the negative comments were related to the categories of
Decommissioning project readiness reviews at the Department of Energy's Hanford, Washington, Site
International Nuclear Information System (INIS)
Speer, D.R.; Holmes, P.A.
1987-01-01
Two Hanford Site contractors independently formulated readiness review methods to prepare for decontamination and decommissioning (D and D) projects. One readiness review method provided an independent management review process. The other method provided a review by personnel directly involved in the project and concise documentation procedures. A unified system is now used at Hanford which combines the best aspects of both readiness review methods. The unified method assigns category levels based on certain job characteristics. The category assigned to the project then indicates the required level of management review prior to proceeding with the D and D project. In addition, the concise documentation procedures are now used for all category levels
A review of software project testing
Directory of Open Access Journals (Sweden)
Jose Calvo-Manzano Villalón
2016-03-01
Full Text Available In this article a review of software projects based on a taxonomy project is established, allowing the development team or testing personnel to identify the tests to which the project must be subjected for validation. The taxonomy is focused on identifying software projects according to their technology. To establish the taxonomy, a development method comprised of 5 phases was applied. The developed taxonomy is comprised of 10 categories and 35 subcategories and was validated by a group of information technology (IT managers and professionals in the field of IT through the use of a survey. The results obtained from the survey are subjected to the Mann-Whitney U test, which indicates that the taxonomy is validated. The taxonomy can be implemented in development organizations with or without a testing team that provides a classification for technology projects.
SPI Project Criticality Task Force initial review and assessment
International Nuclear Information System (INIS)
McKinley, K.B.; Cannon, J.W.; Marsden, R.S.; Worle, H.A.
1980-03-01
The Slagging Pyrolysis Incinerator (SPI) Facility is being developed to process transuranic waste stored and buried at the Idaho National Engineering Laboratory (INEL) into a chemically inert, physically stable, basalt-like residue acceptable for a Federal Repository. A task force was established by the SPI Project Division to review and assess all aspects of criticality safety for the SPI Facility. This document presents the initial review, evaluations, and recommendations of the task force and includes the following: background information on waste characterization, and criticality control approaches and philosophies, a description of the SPI Facility Waste Processing Building, a review and assessment of potentially relevant codes and regulations; a review and assessment of the present state of criticality and assaying/monitoring studies, and recommendations for changes in and additions to these studies. The review and assessment of potentially relevant codes and regulations indicate that ERDAM 0530, Nuclear Criticality Safety should be the controlling document for criticality safety for the SPI Project. In general, the criticality control approaches and philosophies for the SPI Project comply with this document
1981-12-01
A 3-step monitoring of India's population education program was undertaken in 1981 in order to determine the level of implementation and progress of the program. This monitoring program, conducted by the Unesco Mobile Team in collaboration with other institutions, followed 3 procedures: Project Progress Report (PPR); Tripartite Project Review (TPR); and Annual Country Review (ACR). The review meetings of the 10 state population education projects were organized at Chandigarh and Madras during August. The states covered in the review were Bihar, Haryana, Madhaya Pradesh, Punjab, Rajasthan, Chandigarh, Gujarat, Karnataka, Maharashtra, and Tamil Nadu. The Tripartite Review identified the following as problems which were hindering the smooth implementation of the population education program: 1) difficulty in spending funds unless certain formalities were completed by the governments of the states; 2) administrative problems such as getting printing paper for instructional materials, waiving the sales tax for equipment to be purchased under the project, and uncertainty regarding the admissible rates of per diem to be paid to the participants in various training programs; 3) the lack of experience of project staff; 4) problems created by having more than 1 cell in a state such as Rajasthan; and 5) an inadequate time frame within which the project should complete all its activities and make population education an integral part of the school system. The following were among the recommendations made: 1) the Project should be made coterminous with the 6th Five-Year Plan up to March 31, 1985; and 2) there should be only 1 Population Education Cell in every state. Among the points discussed at the annual country review, held during October, were the following: rephasing of the program from a 3 to 5 year project to synchronize it with the 6th plan; and the need for additional funds in view of inflation.
Directory of Open Access Journals (Sweden)
Ming Shan
2017-12-01
Full Text Available Despite the increasing investment in sustainable development over the past decade, a systematic review of sustainable construction project financing is lacking. The objectives of this paper are to conduct a systematic review to examine the policies, practices, and research efforts in the area of sustainable construction project financing, and to explore the potential opportunities for the future research. To achieve these goals, this paper first reviewed the sustainable construction project financing practices implemented by four representative developed economies including the United Kingdom, the United States, Singapore, and Australia. Then, this paper reviewed the efforts and initiatives launched by three international organizations including the United Nations, the Organization for Economic Co-operation and Development, and International Finance Corporation. After that, this paper reviewed the research efforts of sustainable construction project financing published in peer-review journals and books. This paper identified four major research themes within this area, which are the review of financial stakeholders and market of sustainable construction, benefits and barriers to sustainable construction project financing, financial vehicles for sustainable construction projects, innovative models and mechanisms for sustainable construction project financing. Additionally, this paper revealed five directions for the future research of sustainable construction project financing, which are the identification of financial issues in sustainable construction projects, the investigation of financial vehicles for sustainable construction projects in terms of their strengths, limitations, and performances, the examination of critical drivers for implementing sustainable construction project financing, the development of a knowledge-based decision support system for implementing sustainable construction financing, and the development of best practices for
Contractor firm strategies in delivering green project: A review
Powmya, Ayisha; Abidin, Nazirah Zainul; Azizi, Nurul Sakina Mokhtar
2017-10-01
Building green requires effort from various parties, from those who plan, design, manage and construct the building. Contractors are responsible for converting the design on paper into a real building and their role at the construction site support environmental sustainability by implementing responsible construction practices. Inefficient or inexperienced contractor in green construction project may find that delivering this type of project is not an easy task due to added requirement in design, stringent practices at site and the use of green technology and materials. Adopting suitable strategies at firm level will assist in preparatory process and readiness of delivering the green project. This paper reviews the strategies at firm level to deliver green construction project. From extensive literature review, it was discovered that there are six strategies to be adopted by the contractor. Understanding these strategies is expected to promote more contractors to be proactive in delivering green projects.
A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation
Energy Technology Data Exchange (ETDEWEB)
NONE
1993-06-01
Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region.
A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation
International Nuclear Information System (INIS)
1993-01-01
Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region
An Accurate and Impartial Expert Assignment Method for Scientific Project Review
Directory of Open Access Journals (Sweden)
Mingliang Yue
2017-12-01
Full Text Available Purpose: This paper proposes an expert assignment method for scientific project review that considers both accuracy and impartiality. As impartial and accurate peer review is extremely important to ensure the quality and feasibility of scientific projects, enhanced methods for managing the process are needed. Design/methodology/approach: To ensure both accuracy and impartiality, we design four criteria, the reviewers’ fitness degree, research intensity, academic association, and potential conflict of interest, to express the characteristics of an appropriate peer review expert. We first formalize the expert assignment problem as an optimization problem based on the designed criteria, and then propose a randomized algorithm to solve the expert assignment problem of identifying reviewer adequacy. Findings: Simulation results show that the proposed method is quite accurate and impartial during expert assignment. Research limitations: Although the criteria used in this paper can properly show the characteristics of a good and appropriate peer review expert, more criteria/conditions can be included in the proposed scheme to further enhance accuracy and impartiality of the expert assignment. Practical implications: The proposed method can help project funding agencies (e.g. the National Natural Science Foundation of China find better experts for project peer review. Originality/value: To the authors’ knowledge, this is the first publication that proposes an algorithm that applies an impartial approach to the project review expert assignment process. The simulation results show the effectiveness of the proposed method.
Krsko periodic safety review project prioritization process
International Nuclear Information System (INIS)
Basic, I.; Vrbanic, I.; Spiler, J.; Lambright, J.
2004-01-01
Definition of a Krsko Periodic Safety Review (PSR) project is a comprehensive safety review of a plant after last ten years of operation. The objective is a verification by means of a comprehensive review using current methods that Krsko NPP remains safety when judged against current safety objectives and practices and that adequate arrangements are in place to maintain plant safety. This objective encompasses the three main criteria or goals: confirmation that the plant is as safe as originally intended, determination if there are any structures, systems or components that could limit the life of the plant in the foreseeable future, and comparison the plant against modern safety standards and to identify where improvements would be beneficial at justifiable cost. Krsko PSR project is structured in the three phases: Phase 1: Preparation of Detailed 10-years PSR Program, Phase 2: Performing of 10-years PSR Program and preparing of associated documents (2001-2003), and Phase 3: Implementation of the prioritized compensatory measures and modifications (development of associated EEAR, DMP, etc.) after agreement with the SNSA on the design, procedures and time-scales (2004-2008). This paper presents the NEK PSR results of work performed under Phase 2 focused on the ranking of safety issues and prioritization of corrective measures needed for establishing an efficient action plan. Safety issues were identified in Phase 2 during the following review processes: Periodic Safety Review (PSR) task; Krsko NPP Regulatory Compliance Program (RCP) review; Westinghouse Owner Group (WOG) catalog items screening/review; SNSA recommendations (including IAEA RAMP mission suggestions/recommendations).(author)
Design review plan for Multi-Function Waste Tank Facility (Project W-236A)
International Nuclear Information System (INIS)
Renfro, G.G.
1994-01-01
This plan describes how the Multi-Function Waste Tank Facility (MWTF) Project conducts reviews of design media; describes actions required by Project participants; and provides the methodology to ensure that the design is complete, meets the technical baseline of the Project, is operable and maintainable, and is constructable. Project W-236A is an integrated project wherein the relationship between the operating contractor and architect-engineer is somewhat different than that of a conventional project. Working together, Westinghouse Hanford Company (WHC) and ICF Karser Hanford (ICF KH) have developed a relationship whereby ICF KH performs extensive design reviews and design verification. WHC actively participates in over-the-shoulder reviews during design development, performs a final review of the completed design, and conducts a formal design review of the Safety Class I, ASME boiler and Pressure Vessel Code items in accordance with WHC-CM-6-1, Standard Engineering Practices
Project risk management: A review of an institutional project life cycle
Directory of Open Access Journals (Sweden)
Wanjiru Gachie
2017-11-01
Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects
Independent management and financial review, Yucca Mountain Project, Nevada. Final report
Energy Technology Data Exchange (ETDEWEB)
NONE
1995-07-15
The Yucca Mountain Project is one part of the Department of Energy`s Office of Civilian Radioactive Waste Management Program (the Program) which was established by the Nuclear Waste Policy Act of 1982, and as amended in 1987. The Program`s goal is to site the nation`s first geologic repository for the permanent disposal of high-level nuclear waste, in the form of spent fuel rod assemblies, generated by the nuclear power industry and a smaller quantity of Government radioactive waste. The Program, which also encompasses the transportation system and the multipurpose canister system was not the subject of this Report. The subject of this Review was only the Yucca Mountain Project in Nevada. While the Review was directed toward the Yucca Mountain Project rather than the Program as a whole, there are certain elements of the Project which cannot be addressed except through discussion of some Program issues. An example is the Total System Life Cycle Cost addressed in Section 7 of this report. Where Program issues are discussed in this Report, the reader is reminded of the scope limitations of the National Association of Regulatory Utility Commissioners (NARUC) contract to review only the Yucca Mountain Project. The primary scope of the Review was to respond to the specific criteria contained in the NARUC scope of work. In responding to these criteria, the Review Team understood that some interested parties have expressed concern over the requirements of the Nuclear Waste Policy Act relative to the Yucca Mountain Project and the nature of activities currently being carried out by the Department of Energy at the Yucca Mountain Project site. The Review Team has attempted to analyze relevant portions of the Nuclear Waste Policy Act as Amended, but has not conducted a thorough analysis of this legislation that could lead to any specific legal conclusions about all aspects of it.
Independent management and financial review, Yucca Mountain Project, Nevada. Final report
International Nuclear Information System (INIS)
1995-01-01
The Yucca Mountain Project is one part of the Department of Energy's Office of Civilian Radioactive Waste Management Program (the Program) which was established by the Nuclear Waste Policy Act of 1982, and as amended in 1987. The Program's goal is to site the nation's first geologic repository for the permanent disposal of high-level nuclear waste, in the form of spent fuel rod assemblies, generated by the nuclear power industry and a smaller quantity of Government radioactive waste. The Program, which also encompasses the transportation system and the multipurpose canister system was not the subject of this Report. The subject of this Review was only the Yucca Mountain Project in Nevada. While the Review was directed toward the Yucca Mountain Project rather than the Program as a whole, there are certain elements of the Project which cannot be addressed except through discussion of some Program issues. An example is the Total System Life Cycle Cost addressed in Section 7 of this report. Where Program issues are discussed in this Report, the reader is reminded of the scope limitations of the National Association of Regulatory Utility Commissioners (NARUC) contract to review only the Yucca Mountain Project. The primary scope of the Review was to respond to the specific criteria contained in the NARUC scope of work. In responding to these criteria, the Review Team understood that some interested parties have expressed concern over the requirements of the Nuclear Waste Policy Act relative to the Yucca Mountain Project and the nature of activities currently being carried out by the Department of Energy at the Yucca Mountain Project site. The Review Team has attempted to analyze relevant portions of the Nuclear Waste Policy Act as Amended, but has not conducted a thorough analysis of this legislation that could lead to any specific legal conclusions about all aspects of it
Application of project design peer review to improve quality assurance
International Nuclear Information System (INIS)
McClure, F.E.
1989-01-01
DOE ORDER 5481.1B Safety Analysis and Review Systems and DOE ORDER 6430.1A General Design Criteria require that the design of facilities shall incorporate the necessary Quality Assurance review requirements to assure that the established program quality assurance objectives are met in the design criteria and the construction documents. The use of Project Design Peer Review to satisfy these requirements is presented. The University of California manages the Lawrence Berkeley Laboratory, the Lawrence Livermore National Laboratory, and the Los Alamos National Scientific Laboratory. The 1988 University Seismic Safety Policy requires the use of independent Project Design Peer Review in its capital improvement and seismic reconstruction program
Lessons Learned about Post-Tenure Review from the AAHE Peer Review of Teaching Project.
Taylor, James W.
1999-01-01
Describes use of a strategy adapted from the American Association for Higher Education's Peer Review of Teaching Project, the "reflective memo," to provide backward and forward view of post-tenure reviews in the chemistry department of the University of Wisconsin (Madison). The approach served as a guide in review of research, teaching,…
Review of Ruegen herring larvae survey project 2011
Dickey-Collas, M.; Nash, R.D.M.
2011-01-01
At the request of the Johann Heinrich von Thünen Institut (vTI), IOR Rostock, a return review of the German Rügen herring larval survey (RHLS) project took place on the 24th to 26th January 2011, following on from a similar review in November 2006. Mark Dickey-Collas (Wageningen IMARES) and Richard
Maximum entropy PDF projection: A review
Baggenstoss, Paul M.
2017-06-01
We review maximum entropy (MaxEnt) PDF projection, a method with wide potential applications in statistical inference. The method constructs a sampling distribution for a high-dimensional vector x based on knowing the sampling distribution p(z) of a lower-dimensional feature z = T (x). Under mild conditions, the distribution p(x) having highest possible entropy among all distributions consistent with p(z) may be readily found. Furthermore, the MaxEnt p(x) may be sampled, making the approach useful in Monte Carlo methods. We review the theorem and present a case study in model order selection and classification for handwritten character recognition.
International Nuclear Information System (INIS)
1994-01-01
The Agency has been assisting member nations through a number of national TC projects in radiation protection and related areas over the years. In addition, a regional project RAF/9/005 - Radiation Protection Development (which is under this review) was approved in 1988, with the aim of assessing existing radiation protection practices in the African Member States in relation to the Agency's new basic safety standards for radiation protection, and to advise Governments on improvements. The project was subsequently extended up to 1994 as an umbrella project to assist all African Member States in the development of appropriate radiation protection services; to co-ordinate the implementation of the relevant national TC projects; and to develop co-operation amongst groups of Member States on a regional and sub-regional basis. Particular emphasis was to be given to manpower development through workshops, seminars and training courses in radiation protection and safety. In parallel thereto, the Agency's Radiation Protection Advisory Teams (RAPATs) visited nineteen African Member States during the period 1986 through 1993, to review and assess their radiation protection activities, identify priorities, and design long-term radiation protection programmes. RAPAT findings and recommendations were considered in drawing up programmes for implementation under project RAF/9/005
International Nuclear Information System (INIS)
1993-01-01
Projects POL/5/006 was initiated in 1985 to assist the Government of Poland in improving the mutation breeding efforts in the country to promote the development of new and higher yielding crop varieties. The difficult economic situation in the country at this time restricted the procurement of special equipment, spare parts and supplies from abroad and, therefore, impeded research and development work in this field. The project was implemented using a distinctive approach and design characterized by having six recipient institutions and the establishment of one central gamma-irradiation facility to be made available to all participating institutions for mutation induction. The project was formally closed in 1989. The review of project POL/5/006 was undertaken in accord with the expressed wishes of the Board of Governors for selected ex-post evaluations of completed projects. The main purpose of the review was to ascertain if the project objectives were achieved, and to determine what impact the technical assistance provided may have had on continued post-project and current plant breeding programmes in Poland
Energy Technology Data Exchange (ETDEWEB)
NONE
1993-09-14
Projects POL/5/006 was initiated in 1985 to assist the Government of Poland in improving the mutation breeding efforts in the country to promote the development of new and higher yielding crop varieties. The difficult economic situation in the country at this time restricted the procurement of special equipment, spare parts and supplies from abroad and, therefore, impeded research and development work in this field. The project was implemented using a distinctive approach and design characterized by having six recipient institutions and the establishment of one central gamma-irradiation facility to be made available to all participating institutions for mutation induction. The project was formally closed in 1989. The review of project POL/5/006 was undertaken in accord with the expressed wishes of the Board of Governors for selected ex-post evaluations of completed projects. The main purpose of the review was to ascertain if the project objectives were achieved, and to determine what impact the technical assistance provided may have had on continued post-project and current plant breeding programmes in Poland.
Baseline review of the U.S. LHC Accelerator project
International Nuclear Information System (INIS)
1998-02-01
The Department of Energy (DOE) Review of the U.S. Large Hadron Collider (LHC) Accelerator project was conducted February 23--26, 1998, at the request of Dr. John R. O'Fallon, Director, Division of High Energy Physics, Office of Energy Research, U.S. DOE. This is the first review of the U.S. LHC Accelerator project. Overall, the Committee found that the U.S. LHC Accelerator project effort is off to a good start and that the proposed scope is very conservative for the funding available. The Committee recommends that the project be initially baselined at a total cost of $110 million, with a scheduled completion data of 2005. The U.S. LHC Accelerator project will supply high technology superconducting magnets for the interaction regions (IRs) and the radio frequency (rf) straight section of the LHC intersecting storage rings. In addition, the project provides the cryogenic support interface boxes to service the magnets and radiation absorbers to protect the IR dipoles and the inner triplet quadrupoles. US scientists will provide support in analyzing some of the detailed aspects of accelerator physics in the two rings. The three laboratories participating in this project are Brookhaven National Laboratory, Fermi National Accelerator Laboratory (Fermilab), and Lawrence Berkeley National Laboratory. The Committee was very impressed by the technical capabilities of the US LHC Accelerator project team. Cost estimates for each subsystem of the US LHC Accelerator project were presented to the Review Committee, with a total cost including contingency of $110 million (then year dollars). The cost estimates were deemed to be conservative. A re-examination of the funding profile, costs, and schedules on a centralized project basis should lead to an increased list of deliverables. The Committee concluded that the proposed scope of US deliverables to CERN can be readily accomplished with the $110 million total cost baseline for the project. The current deliverables should serve as
Congressional hearing reviews NSF major research and facilities projects
Showstack, Randy
2012-03-01
An 8 March congressional hearing about the U.S. National Science Foundation's Major Research Equipment and Facilities Construction (NSF MREFC) account focused on fiscal management and accountability of projects in that account and reviewed concerns raised by NSF's Office of Inspector General (OIG). NSF established the MREFC account in 1995 to better plan and manage investments in major equipment and facilities projects, which can cost from tens of millions to hundreds of millions of dollars, and the foundation has funded 17 MREFC projects since then. The Obama administration's proposed fiscal year (FY) 2013 budget includes funding for four MREFC projects: Advanced Laser Gravitational-Wave Observatory (AdvLIGO), Advanced Technology Solar Telescope (ATST), National Ecological Observatory (NEON), and Ocean Observatories Initiative (OOI). The hearing, held by a subcommittee of the House of Representatives' Committee on Science, Space, and Technology, reviewed management oversight throughout the life cycles of MREFC projects and concerns raised in recent OIG reports about the use of budget contingency funds. NSF's February 2012 manual called "Risk management guide for large facilities" states that cost contingency is "that portion of the project budget required to cover `known unknowns,'" such as planning and estimating errors and omissions, minor labor or material price fluctuations, and design developments and changes within the project scope. Committee members acknowledged measures that NSF has made to improve the MREFC oversight process, but they also urged the agency to continue to take steps to ensure better project management.
Directory of Open Access Journals (Sweden)
Farhad Habibi
2018-09-01
Full Text Available Among different factors, correct scheduling is one of the vital elements for project management success. There are several ways to schedule projects including the Critical Path Method (CPM and Program Evaluation and Review Technique (PERT. Due to problems in estimating dura-tions of activities, these methods cannot accurately and completely model actual projects. The use of fuzzy theory is a basic way to improve scheduling and deal with such problems. Fuzzy theory approximates project scheduling models to reality by taking into account uncertainties in decision parameters and expert experience and mental models. This paper provides a step-by-step approach for accurate estimation of time and cost of projects using the Project Evaluation and Review Technique (PERT and expert views as fuzzy numbers. The proposed method included several steps. In the first step, the necessary information for project time and cost is estimated using the Critical Path Method (CPM and the Project Evaluation and Review Technique (PERT. The second step considers the duration and cost of the project activities as the trapezoidal fuzzy numbers, and then, the time and cost of the project are recalculated. The duration and cost of activities are estimated using the questionnaires as well as weighing the expert opinions, averaging and defuzzification based on a step-by-step algorithm. The calculating procedures for evaluating these methods are applied in a real project; and the obtained results are explained.
A review of the possible future HEP Accelerator Projects
CERN. Geneva
2010-01-01
The review, as already invited for presentation at the recent International Conference on High Energy Physics (ICHEP2010), covers all accelerator projects presently envisaged for HEP in the near and mid-term future. After a brief description of the major motivation, issues and necessary R&D of each project, it specially emphasizes the synergies between the different projects and their R&D issues, pointing out their complementarities and the efficient collaborative approach to address them. It finally summarizes the relative schedule of the various projects in their different phases, pointing out their global interdependence.
Richstein, Alan B.; Nolte, Jerome T.; Pfarr, Barbara B.
2004-01-01
There are numerous technical reviews that occur throughout the systems engineering process life cycle. Many are well known by project managers and stakeholders such as developers and end users, an example of much is the critical design review (CDR). This major milestone for a large, complex new project may last two or more days, include an extensive agenda of topics, and entail hundreds of hours of developer time to prepare presentation materials and associated documents. Additionally, the weeks of schedule spent on review preparation is at least partly at the expense of other work. This paper suggests an approach for tailoring technical reviews, based on the project characteristics and the project manager s identification of the key stakeholders and understanding of their most important issues and considerations. With this insight the project manager can communicate to, manage expectations oc and establish formal agreement with the stakeholders as to which reviews, and at what depth, are most appropriate to achieve project success. The authors, coming from diverse organizations and backgrounds, have drawn on their personal experiences and summarized the best practices of their own organizations to create a common framework to provide guidance on the adaptation of design reviews to other system engineers.
Review of BPA funded sturgeon, resident fish and wildlife projects
International Nuclear Information System (INIS)
1990-12-01
The Bonneville Power Administration (BPA) held a public meeting on November 19--21, 1991, for the purpose of review, coordination, and consultation of the BPA-funded projects for sturgeon, resident fish, and wildlife in the Columbia River Basin (Basin). The comments received after the meeting were favorable and the participants agreed that the meeting was stimulating and productive. The information exchanged should lead to better coordination with other projects throughout the Basin. This document list the projects by title, the project leaders and BPA's project officers, and an abstract of each leader's presentation
Energy Technology Data Exchange (ETDEWEB)
NONE
2008-12-19
This paper presented the results of a review of the Dunvegan hydroelectric project proposed for development on Alberta's Peace River. In addition to stating the project's purpose, viability, and benefits, the review examined the potential environmental and socio-economic impacts of the hydroelectric project and outlined conclusions developed through consultation with participants of public hearings. The review included a study of transmission lines needed for the project, and the likely impact of the hydroelectric plant on the Peace River fishery and ice regimes. Geotechnical issues related to slope stability, sedimentation and channel morphology, seismicity, and sedimentation in the region were analyzed. The impact of the project on wildlife, vegetation and forest resources was also examined. The study also examined impacts related to health and safety. Potential cumulative effects were reviewed, and First Nations and Metis concerns were outlined. It was concluded that impacts related to the construction, operation, and decommissioning of the project are not likely to be significant. tabs., figs.
Energy Technology Data Exchange (ETDEWEB)
NONE
1994-04-15
A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the outputs of a project. This project was originally intended for six selected countries in Africa, namely, Algeria, Egypt, Ghana, Libya, Zaire and Zambia. Ethiopia and Tanzania joined in 1993 and it has now been extended to two other countries, Madagascar and Sudan. This is a step forward towards developing the infrastructure for nuclear instrumentation and maintenance is as many countries in Africa as require this service. A project summary along with financial data and recommendations for improvements are given. A table where total assistance provided to ten selected african countries is included.
International Nuclear Information System (INIS)
1994-01-01
A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the outputs of a project. This project was originally intended for six selected countries in Africa, namely, Algeria, Egypt, Ghana, Libya, Zaire and Zambia. Ethiopia and Tanzania joined in 1993 and it has now been extended to two other countries, Madagascar and Sudan. This is a step forward towards developing the infrastructure for nuclear instrumentation and maintenance is as many countries in Africa as require this service. A project summary along with financial data and recommendations for improvements are given. A table where total assistance provided to ten selected african countries is included
Savolainen, Paula; Ahonen, Jarmo J.; Richardson, Ita
2012-01-01
peer-reviewed In this paper, we consider software development project success and failure from the supplier's perspective. First we clarified concepts in order to be able to exclude review articles on in-house projects, continuous services, the customer's perspective, and software product development, with the aim of providing valid results for supplier firms. We divided success criteria into project success and project management (PM) success, and, in seven articles, identified thre...
The Greenland Analogue Project (GAP). Literature review of hydrogeology/ hydrogeochemistry
Energy Technology Data Exchange (ETDEWEB)
Wallroth, Thomas; Lokrantz, Hanna; Rimsa, Andrius (Bergab Consulting Geologists, Goeteborg (Sweden))
2010-09-15
This report is produced as part of the Greenland Analogue Project (GAP), carried out as a collaboration project with the Canadian Nuclear Waste Management Organization (NWMO), Posiva Oy and the Swedish Nuclear Fuel and Waste Management Co (SKB). The overall aim of the project is to improve the current understanding of hydrogeological and hydrogeochemical processes associated with continental-scale glacial periods including with the presence of permafrost and the advance/retreat of ice sheets. The project will focus on studying how an ice sheet affects groundwater flow and water chemistry around a deep geological repository in crystalline bedrock. The Greenland Analogue Project consists of three active sub-projects (A-C) with individual objectives. Field studies are conducted in the Kangerlussuaq region, in central Western Greenland. Sub-projects A and B collectively aim at improving the understanding of ice sheet hydrology by combining investigations on surface water processes with ice sheet drilling and instrumentation. In sub-project C, the penetration of glacial melt water into the bedrock, groundwater flow and the chemical composition of water will be studied. Main planned activities in sub-project C include drilling of a deep borehole in front of the ice sheet, in which different downhole surveys, sampling and monitoring will be carried out. The primary aim of this report is to review available information about hydrogeology and hydrogeochemistry in central Western Greenland, with special emphasis on the area around Kangerlussuaq. The relevant information about this area is however very limited, and it was decided to extend the review to briefly include studies made in other regions with similar conditions in terms of geology, climate and glaciology. The number of published studies made in other areas with glaciers, ice sheets or permafrost is very large, and the review and list of references in this report is far from complete. It is also obvious that both
The Greenland Analogue Project (GAP). Literature review of hydrogeology/ hydrogeochemistry
International Nuclear Information System (INIS)
Wallroth, Thomas; Lokrantz, Hanna; Rimsa, Andrius
2010-09-01
This report is produced as part of the Greenland Analogue Project (GAP), carried out as a collaboration project with the Canadian Nuclear Waste Management Organization (NWMO), Posiva Oy and the Swedish Nuclear Fuel and Waste Management Co (SKB). The overall aim of the project is to improve the current understanding of hydrogeological and hydrogeochemical processes associated with continental-scale glacial periods including with the presence of permafrost and the advance/retreat of ice sheets. The project will focus on studying how an ice sheet affects groundwater flow and water chemistry around a deep geological repository in crystalline bedrock. The Greenland Analogue Project consists of three active sub-projects (A-C) with individual objectives. Field studies are conducted in the Kangerlussuaq region, in central Western Greenland. Sub-projects A and B collectively aim at improving the understanding of ice sheet hydrology by combining investigations on surface water processes with ice sheet drilling and instrumentation. In sub-project C, the penetration of glacial melt water into the bedrock, groundwater flow and the chemical composition of water will be studied. Main planned activities in sub-project C include drilling of a deep borehole in front of the ice sheet, in which different downhole surveys, sampling and monitoring will be carried out. The primary aim of this report is to review available information about hydrogeology and hydrogeochemistry in central Western Greenland, with special emphasis on the area around Kangerlussuaq. The relevant information about this area is however very limited, and it was decided to extend the review to briefly include studies made in other regions with similar conditions in terms of geology, climate and glaciology. The number of published studies made in other areas with glaciers, ice sheets or permafrost is very large, and the review and list of references in this report is far from complete. It is also obvious that both
76 FR 60774 - Review and Approval of Projects
2011-09-30
... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Part 806 Review and Approval of Projects AGENCY: Susquehanna River Basin Commission. ACTION: Notice of proposed rulemaking; reopening of comment period. SUMMARY: The purpose of this document is to inform the public of an extension of the comment period for...
International Nuclear Information System (INIS)
Byram, S.J.
1991-05-01
The Hanford Environmental Dose Reconstruction (HEDR) Project will estimate radiation exposures people may have received from radioactive materials released during past operations at the Department of Energy's Hanford Site near Richland, Washington. The project is being conducted by Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The Centers for Disease Control (CDC) will use HEDR dose estimates in studies to investigate a potential link between thyroid disease and historical Hanford emissions. The HEDR Project was initiated to address public concerns about the possible health impacts from past releases of radioactive materials from Hanford. The TSP recognized early in the project that special mechanisms would be required to communicate effectively to the many different concerned audiences. To identify and develop these mechanisms, the TSP issued Directive 89-7 to PNL in May 1989. The TSP directed PNL to examine methods to communicate the causes and effects of uncertainties in the dose estimates. A literature review was conducted as the first activity in response to the TSP's directive. This report presents the results of the literature review. The objective of the literature review was to identify ''key principles'' that could be applied to develop communications strategies for the project. 26 refs., 6 figs
Independent technical review of the Sandia National Laboratories Environmental Restoration Project
International Nuclear Information System (INIS)
1994-11-01
An Independent Technical Review was conducted of the Environmental Restoration Project. The objective of the review was recommendations, from a commercial perspective, on a systems level path forward to safe, minimum cost and schedule project completion. The work presented represents the consensus analysis and recommendations of thirteen individuals with varied backgrounds, expertise, and experience. The ITR team recommends that the barriers to the opportunity described in the diagnosis be eliminated using an integrated DOE-Sandia system approach. Piecemeal changes will not result in the desired commercial efficiency. DOE needs to operate as the contracting agency for a Major System Acquisition. If it does not, commercial performance will not be achieved regardless of the contractor. Likewise, Sandia needs to establish and implement the necessary project structure and management systems to operate with commercial contractor like efficiency
Design for Sustainability and Project Management Literature – A Review
DEFF Research Database (Denmark)
Ali, Faheem; Boks, Casper; Bey, Niki
2016-01-01
management literature has hardly been considered in design for sustainability research, this article attempts to review the points of intersection between these two fields, and explores the potential that knowledge from project management literature has in improving efficiency and effectiveness...... of development and implementation of design for sustainability tools.......The growing pressure on natural resources and increasing global trade have made sustainability issues a prime area of concern for all businesses alike. The increased focus on sustainability has impacted the way projects are conceived, planned, executed and evaluated in industries. Since project...
Final design review report for K basin dose reduction project
International Nuclear Information System (INIS)
Blackburn, L.D.
1996-01-01
The strategy for reducing radiation dose originating from radionuclides absorbed in the K East Basin concrete is to raise the pool water level to provide additional shielding. This report documents a final design review for cleaning/coating basin walls and modifying other basin components where appropriate. The conclusion of this review was that the documents developed constitute an acceptable design for the Dose Reduction Project
Economic Evaluation Methodology Review on KAERI's Recent Projects
Energy Technology Data Exchange (ETDEWEB)
Cho, Jin Sam; Kim, Jee Young [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)
2012-05-15
In technology utilization, economics evaluation is helpful to R and D program managers by giving them economic information needed to improve the usefulness of their projects. Moreover it can help them to communicate to others participants keeping all of them value-oriented minded through the whole development process. In this context, KAERI(Korea Atomic Energy Research Institute) has been performed economic evaluation on recent some projects. So, in this study, it has been made brief reviews on KAERI's economic evaluation methodology to its recent some projects of which evaluation we engage in, especially PEFP(Proton Engineering frontier Project) and SMART(Small Medium advanced ReacTor): Methodology comparison and their pros and cons
The sustainable project management: A review and future possibilities
Directory of Open Access Journals (Sweden)
V.K. Chawla
2018-06-01
Full Text Available Sustainability in project operations such as financial, social and environmental sustainability is one of the most prominent issues of the present times to address. The increased focus on sus-tainable business operations has changed the viewpoint of researchers and corporate community towards the project management. Today sustainability in business operations along with sustain-ability of natural and environmental resources are of paramount significance which has further caused a huge impact on conception, planning, scheduling and execution of the project manage-ment activities. In this paper, a literature review between 1987 and 2018 on different issues af-fecting the sustainability in project management is carried out. The present study also identifies and discusses the future possibilities to apply computational procedures in order to estimate and optimize the sustainability issues in the management of projects, for example the computational evolutionary algorithms can be applied to formulate the multi-objective decision-making problem after considering critical factors of sustainability in the projects and then yielding optimized solu-tions for the formulated problem to achieve sustainability in the projects. A new integrated framework with the inclusion of feedback function for assessment of each decision and actions taken towards the sustainability of the projects is also identified and presented.
First interim project review meeting on management of water hyacinth
International Nuclear Information System (INIS)
1980-01-01
The first project planning meeting was held in New Delhi during 1978 and the second, a project review meeting, in Papua New Guinea during June 1979, both funded by UNEP. Reports from the regional coordinators for Bangladesh, Malaysia, Sri Lanka, Fiji and India are presented. Also presented are reports from the national coordinators for Malaysia, Bangladesh and India. Two visits (a visit to India, Bangladesh and Sri Lanka to study the feasibility of making a film on the work done with water hyacinth and a visit to the U.S. by the regional project coordinator) are also described
77 FR 14272 - Review and Approval of Projects
2012-03-09
... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Part 806 Review and Approval of Projects CFR Correction In Title 18 of the Code of Federal Regulations, Part 400 to End, revised as of April 1, 2011, on page 118, in Sec. 806.6, (b)(1)(i) and (ii) are removed. [FR Doc. 2012-5837 Filed 3-8-12; 8:45 am] BILLING...
Energy Technology Data Exchange (ETDEWEB)
NONE
1994-12-09
A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab.
International Nuclear Information System (INIS)
1994-01-01
A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab
Financing Renewable Energy Projects in Developing Countries: A Critical Review
Donastorg, A.; Renukappa, S.; Suresh, S.
2017-08-01
Access to clean and stable energy, meeting sustainable development goals, the fossil fuel dependency and depletion are some of the reasons that have impacted developing countries to transform the business as usual economy to a more sustainable economy. However, access and availability of finance is a major challenge for many developing countries. Financing renewable energy projects require access to significant resources, by multiple parties, at varying points in the project life cycles. This research aims to investigate sources and new trends in financing RE projects in developing countries. For this purpose, a detail and in-depth literature review have been conducted to explore the sources and trends of current RE financial investment and projects, to understand the gaps and limitations. This paper concludes that there are various internal and external sources of finance available for RE projects in developing countries.
Nuclear heating - a review of projects in several countries
International Nuclear Information System (INIS)
Vymetal, L.
1980-01-01
A review is presented of projects and studies of nuclear heat generation and district heating in the USSR, France, Sweden, Finland, USA, FRG, and CSSR. Attention is primarily paid to the nuclear sources, i.e., nuclear power and heating plants and special reactors for nuclear heating plants. The questions of heat transmission and costs are also dealt with. The review is based on the literature published between 1976 and 1979. An important source were materials from the conference on the use of low-potential heat from nuclear reactors held in Otaniemi (Finland) in 1977. (author)
Review on Population Projection Methodology for Radiological Dose Assessment
Energy Technology Data Exchange (ETDEWEB)
Jang, M. S.; Kang, H. S.; Kim, S. R. [NESS, Daejeon (Korea, Republic of); Hwang, W. T. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Yang, Y. H. [KHNP, Daejeon (Korea, Republic of)
2015-05-15
Radiation environment report (RER), one of the essential documents in plant operating license or continuous operation license, includes population projection. Population estimates are utilized in determining the collective dose at the operation or restart time of nuclear power plant. Many population projection models are suggested and also under development. We carried out the sensitivity analysis on various population projection models to Daejeon city as a target. Daejeon city showed the increase or decrease in the cross-sectional population, because of the development of Sejong city, Doan new town and etc. We analyzed the population of Daejeon city using statistical ARIMA model and various simple population projection models. It is important to determine the population limit in Modified exponential model but it is not easy. Therefore, the various properties of the area such as the decrease and increase of population, new town development plan, social and natural environment change and etc., should be carefully reviewed to estimate the future population of any area.
Review on Population Projection Methodology for Radiological Dose Assessment
International Nuclear Information System (INIS)
Jang, M. S.; Kang, H. S.; Kim, S. R.; Hwang, W. T.; Yang, Y. H.
2015-01-01
Radiation environment report (RER), one of the essential documents in plant operating license or continuous operation license, includes population projection. Population estimates are utilized in determining the collective dose at the operation or restart time of nuclear power plant. Many population projection models are suggested and also under development. We carried out the sensitivity analysis on various population projection models to Daejeon city as a target. Daejeon city showed the increase or decrease in the cross-sectional population, because of the development of Sejong city, Doan new town and etc. We analyzed the population of Daejeon city using statistical ARIMA model and various simple population projection models. It is important to determine the population limit in Modified exponential model but it is not easy. Therefore, the various properties of the area such as the decrease and increase of population, new town development plan, social and natural environment change and etc., should be carefully reviewed to estimate the future population of any area
A desk evaluation review of project BGD/5/010 food irradiation. Project desk evaluation
Energy Technology Data Exchange (ETDEWEB)
NONE
1993-03-26
To increase the availability of food, the Bangladesh Atomic Energy Commission (BAEC), through its institute of Food and Radiation Biology (IFRB), has for many years pursued research studies in the use of ionizing radiation for food disinfestation and preservation. The Agency has been assisting these research efforts since the late 1970s. Project BGD/5/010, Food Irradiation, as reformulated in 1984, was to take on-going activities ones step further, with the main objective of demonstrating on a semi-commercial scale the efficacy and profitability of food irradiation in reducing the high storage losses of economically important food, such as potatoes, onions, dried fish and other seafood. A further objective was the transfer of food irradiation technology to the relevant industries in Bangladesh. The total budget of the project for the years 1983 through 1992 includes 5.1 man-months of expert services, $1,064,634 for equipment and $29,200 for training. The review was undertaken upon request by the Asia and the Pacific Section, to assess the current status of this ten-year project, which has encountered numerous delays and set-backs and is now nearing completion, and to determine to what extent the experience gained on the project could be useful in the implementation of similar on-going and future projects.
A desk evaluation review of project BGD/5/010 food irradiation. Project desk evaluation
International Nuclear Information System (INIS)
1993-01-01
To increase the availability of food, the Bangladesh Atomic Energy Commission (BAEC), through its institute of Food and Radiation Biology (IFRB), has for many years pursued research studies in the use of ionizing radiation for food disinfestation and preservation. The Agency has been assisting these research efforts since the late 1970s. Project BGD/5/010, Food Irradiation, as reformulated in 1984, was to take on-going activities ones step further, with the main objective of demonstrating on a semi-commercial scale the efficacy and profitability of food irradiation in reducing the high storage losses of economically important food, such as potatoes, onions, dried fish and other seafood. A further objective was the transfer of food irradiation technology to the relevant industries in Bangladesh. The total budget of the project for the years 1983 through 1992 includes 5.1 man-months of expert services, $1,064,634 for equipment and $29,200 for training. The review was undertaken upon request by the Asia and the Pacific Section, to assess the current status of this ten-year project, which has encountered numerous delays and set-backs and is now nearing completion, and to determine to what extent the experience gained on the project could be useful in the implementation of similar on-going and future projects
Projecting Future Heat-Related Mortality under Climate Change Scenarios: A Systematic Review
Barnett, Adrian Gerard; Wang, Xiaoming; Vaneckova, Pavla; FitzGerald, Gerard; Tong, Shilu
2011-01-01
Background: Heat-related mortality is a matter of great public health concern, especially in the light of climate change. Although many studies have found associations between high temperatures and mortality, more research is needed to project the future impacts of climate change on heat-related mortality. Objectives: We conducted a systematic review of research and methods for projecting future heat-related mortality under climate change scenarios. Data sources and extraction: A literature search was conducted in August 2010, using the electronic databases PubMed, Scopus, ScienceDirect, ProQuest, and Web of Science. The search was limited to peer-reviewed journal articles published in English from January 1980 through July 2010. Data synthesis: Fourteen studies fulfilled the inclusion criteria. Most projections showed that climate change would result in a substantial increase in heat-related mortality. Projecting heat-related mortality requires understanding historical temperature–mortality relationships and considering the future changes in climate, population, and acclimatization. Further research is needed to provide a stronger theoretical framework for projections, including a better understanding of socioeconomic development, adaptation strategies, land-use patterns, air pollution, and mortality displacement. Conclusions: Scenario-based projection research will meaningfully contribute to assessing and managing the potential impacts of climate change on heat-related mortality. PMID:21816703
Parrott, Edith L.; Weiland, Karen J.
2017-01-01
The ability of systems engineers to use model-based systems engineering (MBSE) to generate self-consistent, up-to-date systems engineering products for project life-cycle and technical reviews is an important aspect for the continued and accelerated acceptance of MBSE. Currently, many review products are generated using labor-intensive, error-prone approaches based on documents, spreadsheets, and chart sets; a promised benefit of MBSE is that users will experience reductions in inconsistencies and errors. This work examines features of SysML that can be used to generate systems engineering products. Model elements, relationships, tables, and diagrams are identified for a large number of the typical systems engineering artifacts. A SysML system model can contain and generate most systems engineering products to a significant extent and this paper provides a guide on how to use MBSE to generate products for project life-cycle and technical reviews. The use of MBSE can reduce the schedule impact usually experienced for review preparation, as in many cases the review products can be auto-generated directly from the system model. These approaches are useful to systems engineers, project managers, review board members, and other key project stakeholders.
International Nuclear Information System (INIS)
2013-01-01
The construction readiness review (CORR) mission for nuclear power plant projects has been established with the aim of conducting peer reviews of construction projects related to nuclear power plants. Such a mission provides a detailed assessment of readiness for construction, construction progress, readiness for turnover, as well as recommendations for improvement. Organizations in Member States, such as nuclear utilities, owners, regulators and technical support organizations, can benefit from such reviews. A team of international experts with complementing specialities will conduct the CORR mission. The review is based on appropriate IAEA publications, such as IAEA Safety Standards Series Guides and IAEA Nuclear Energy Series publications, as well as on internationally recognized project and construction management guides. Mission findings are summarized in a mission report, which includes a list of recommendations, suggestions and identified good practices. The review is not intended to be a regulatory inspection or an audit against international codes and standards. Rather, it is a peer review aimed at improving implementation processes and procedures through an exchange of technical experiences and practices at the working level. The mission is applicable at any stage of a nuclear power plant construction project, although two specific phases are targeted: (1) start of construction mission (Phase 1 mission) and (2) an in-progress mission (Phase 2 mission). Missions are initiated when official requests are submitted by Member States through the appropriate IAEA channels
Design iteration in construction projects – Review and directions
Directory of Open Access Journals (Sweden)
Purva Mujumdar
2018-03-01
Full Text Available Design phase of any construction project involves several designers who exchange information with each other most often in an unstructured manner throughout the design phase. When these information exchanges happen to occur in cycles/loops, it is termed as design iteration. Iteration is an inherent and unavoidable aspect of any design phase which requires proper planning. Till date, very few researchers have explored the design iteration (“complexity” in construction sector. Hence, the objective of this paper was to document and review the complexities of iteration during design phase of construction projects for efficient design planning. To achieve this objective, exhaustive literature review on design iteration was done for four sectors – construction, manufacturing, aerospace, and software development. In addition, semi-structured interviews and discussions were done with a few design experts to verify the different dimensions of iteration. Finally, a design iteration framework was presented in this study that facilitates successful planning. Keywords: Design iteration, Types of iteration, Causes and impact of iteration, Models of iteration, Execution strategies of iteration
Chen, Ming; Peng, Miao; Zhou, Hui; Zheng, Zhiwei; Tang, Xionggui; Maivan, Lap
2017-12-01
To further improve receiver sensitivity of spectrally-efficient guard-band direct-detection optical orthogonal frequency-division multiplexing (OFDM) with twin single-side-band (SSB) modulation technique, an optical IQ modulator (IQM) is employed to optimize optical carrier-to-signal power ratio (CSPR). The CSPRs for the guard-band twin-SSB-OFDM signal generated by using dual-drive Mach-Zehnder modulator (DD-MZM) and optical IQM are theoretically analyzed and supported by simulations. The optimal CSPR for the two types of guard-band twin-SSB-OFDM are identified. The simulations exhibit that the error vector magnitude (EVM) performance of the IQM-enabled guard-band twin-SSB-OFDM is improved by more than 4-dB compared to that of the twin-SSB-OFDM enabled by DD-MZM after 80-km single-mode fiber (SMF) transmission. In addition, more than 3-dB and 10 dB receiver sensitivity improvements in terms of received optical power (ROP) and optical signal-to-noise ratio (OSNR) are also achieved, respectively.
Energy Technology Data Exchange (ETDEWEB)
Howerton, Jack
1984-11-01
This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.
International Nuclear Information System (INIS)
Clark, D.E.
1986-11-01
The Engineering Review Group (ERG) was established by the Office of Nuclear Waste Isolation (ONWI) to help evaluate engineering-related issues in the US Department of Energy's nuclear waste repository program. The August 1985 meeting of the ERG reviewed the Salt Repository Project (SRP) salt irradiation effects program. This report documents the ERG's comments and recommendations on these subjects and the ONWI response to the specific points raised by the ERG
International Nuclear Information System (INIS)
Underhill, D.
2004-01-01
This report describes the Canadian environmental review process for uranium production projects as a case study for the purpose of understanding the nature and value of stakeholder involvement in the management of radiological hazards. While the Canadian review process potentially applies to any development, this case study focuses on the assessment of the uranium projects of northern Saskatchewan conducted during the 1990's. It describes the environmental assessment (EA) conducted in the 1990's for six new uranium facilities (including mines and mills and related tailings disposal sites) planned in northern Saskatchewan. Both the Canadian federal and the Saskatchewan provincial government have extensive environmental review processes that must under law be complete before any major industrial development judged to have potential environmental impacts is undertaken within their respective territories. However, even in those instances where no clear potential environmental impacts are evident, Canadian law mandates 'if public concern about the proposal is such that a public review is desirable, the initiating department shall refer the proposal to the Minister for review by a Panel'. (Wh95) As a stakeholder under law, in both Canada and Saskatchewan, the public plays an important role in the environmental review process. To encourage participation and assist the public in its review the two governments may provide funding (as done in this review) to assist qualified individuals or groups to participant in the review process. The first section of this case study sets the scene. It describes the Saskatchewan uranium mining story, focusing on how the importance of the public stakeholder evolved to become a major component, under law, in the EA process for new uranium mines. This increase in stakeholder involvement opportunities coincided with heightened public concern for the socio-economic impacts of the projects. In the late 1980's both governments were advised by
Systematic Review Methodology for the Fatigue in Emergency Medical Services Project
2018-01-11
Background: Guidance for managing fatigue in the Emergency Medical Services (EMS) setting is limited. The Fatigue in EMS Project sought to complete multiple systematic reviews guided by seven explicit research questions, assemble the best available e...
A review of risk management process in construction projects of developing countries
Bahamid, R. A.; Doh, S. I.
2017-11-01
In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.
Department of Energy review of the National Spallation Neutron Source Project
Energy Technology Data Exchange (ETDEWEB)
NONE
1997-06-01
A Department of Energy (DOE) review of the Conceptual Design Report (CDR) for the National Spallation Neutron Source (NSNS) was conducted. The NSNS will be a new high-power spallation neutron source; initially, it will operate at 1 megawatt (MW), but is designed to be upgradeable to significantly higher power, at lower cost, when accelerator and target technologies are developed for higher power. The 53-member Review Committee examined the projected cost, schedule, technical scope, and management structure described in the CDR. For each of the major components of the NSNS, the Committee determined that the project team had produced credible designs that can be expected to work well. What remains to be done is to integrate the design of these components. With the exception of the liquid mercury target, the NSNS Project will rely heavily on proven technologies and, thus, will face a relatively low risk to successful project completion. The Total Project Cost (TPC) presented to the Committee in the CDR was $1.266 billion in as-spent dollars. In general, the Committee felt that the laboratory consortium had presented a credible estimate for each of the major components but that value engineering might produce some savings. The construction schedule presented to the Committee covered six years beginning in FY 1999. The Committee questioned whether all parts of the project could be completed according to this schedule. In particular, the linac and the conventional facilities appeared to have overly optimistic schedules. The NSNS project team was encouraged to reexamine these activities and to consider a more conservative seven-year schedule. Another concern of the Committee was the management structure. In summary, the Committee felt that this Conceptual Design Report was a very credible proposal, and that there is a high probability for successful completion of this major project within the proposed budget, although the six-year proposed schedule may be optimistic.
Department of Energy review of the National Spallation Neutron Source Project
International Nuclear Information System (INIS)
1997-06-01
A Department of Energy (DOE) review of the Conceptual Design Report (CDR) for the National Spallation Neutron Source (NSNS) was conducted. The NSNS will be a new high-power spallation neutron source; initially, it will operate at 1 megawatt (MW), but is designed to be upgradeable to significantly higher power, at lower cost, when accelerator and target technologies are developed for higher power. The 53-member Review Committee examined the projected cost, schedule, technical scope, and management structure described in the CDR. For each of the major components of the NSNS, the Committee determined that the project team had produced credible designs that can be expected to work well. What remains to be done is to integrate the design of these components. With the exception of the liquid mercury target, the NSNS Project will rely heavily on proven technologies and, thus, will face a relatively low risk to successful project completion. The Total Project Cost (TPC) presented to the Committee in the CDR was $1.266 billion in as-spent dollars. In general, the Committee felt that the laboratory consortium had presented a credible estimate for each of the major components but that value engineering might produce some savings. The construction schedule presented to the Committee covered six years beginning in FY 1999. The Committee questioned whether all parts of the project could be completed according to this schedule. In particular, the linac and the conventional facilities appeared to have overly optimistic schedules. The NSNS project team was encouraged to reexamine these activities and to consider a more conservative seven-year schedule. Another concern of the Committee was the management structure. In summary, the Committee felt that this Conceptual Design Report was a very credible proposal, and that there is a high probability for successful completion of this major project within the proposed budget, although the six-year proposed schedule may be optimistic
The Virtual Factory Teaching System (VFTS): Project Review and Results.
Kazlauskas, E. J.; Boyd, E. F., III; Dessouky, M. M.
This paper presents a review of the Virtual Factory Teaching (VFTS) project, a Web-based, multimedia collaborative learning network. The system allows students, working alone or in teams, to build factories, forecast demand for products, plan production, establish release rules for new work into the factory, and set scheduling rules for…
Nuclear emergency planning in Spain. The PLABEN review project
International Nuclear Information System (INIS)
Lentijo Lentijo, J. C.; Vila Pena, M.
2002-01-01
The international rules and recommendations for nuclear emergency planning and the Spanish experience gained in the management of event with radiological risk have noticed that is necessary to review the planning radiological bases for emergencies in nuclear power plants and to define the planning radiological bases for radiological emergencies that could happen in radioactive facilities or in activities out of the regulatory framework. The paper focuses on CSN actions concerning the Plaben review project related to define the new radiological principles taking into account the current international recommendations for interventions, make a proposal about the organisation and operation of the provincial radiological action group and the national support level for radiological emergency response. (Author) 7 refs
DEFF Research Database (Denmark)
Laursen, Markus; Svejvig, Per
2016-01-01
This paper aims to take stock of what we know about project value creation and to present future directions for research and practice. We performed an explorative and unstructured literature review, which was subsequently paired with a structured literature review. We join several research areas...... by adopting the project value creation perspective on literature relating to benefits, value, performance, and success in projects. Our review includes 111 contributions analyzed through both an inductive and deductive approach. We find that relevant literature dates back to the early 1980s, and the still...... developing value-centric view has been the subject of many publications in recent years. We contribute to research on project value creation through four directions for future research: rejuvenating value management through combining value, benefits, and costs; supplementing value creation with value capture...
Scott, Anna Mae; Clark, Justin; Dooley, Liz; Jones, Ann; Jones, Mark; Del Mar, Chris
2018-05-22
Cochrane Acute Respiratory Infections (ARI) Group conducts systematic reviews of the evidence for treatment and prevention of ARIs. We report the results of a prioritisation project, aiming to identify highest priority systematic review topics. The project consisted of 2 Phases. Phase 1 analysed the gap between existing RCTs and Cochrane Systematic Reviews (reported previously). Phase 2 (reported here) consisted of a two-round survey. In round 1, respondents prioritised 68 topics and suggested up to 10 additional topics; in Round 2, respondents prioritised top 25 topics from Round 1. Respondents included clinicians, researchers, systematic reviewers, allied health, patients, and carers, from 33 different countries. In Round 1, 154 respondents identified 20 priority topics, most commonly selecting topics in non-specific ARIs, influenza, and common cold. 50 respondents also collectively suggested 134 additional topics. In Round 2, 78 respondents prioritised top 25 topics, most commonly in the areas of non-specific ARIs, pneumonia and influenza. We generated a list of priority systematic review topics, to guide the Cochrane ARI Group's systematic review work for the next 24 months. Stakeholder involvement enhanced the transparency of the process, and will increase the usability and relevance of the Group's work to stakeholders. Copyright © 2018 Elsevier Inc. All rights reserved.
Critical Success Factors for Malaysian Construction Projects: An Investigative Review
Directory of Open Access Journals (Sweden)
Yee Cheong Yong
2017-05-01
Full Text Available Construction projects play an important role in the advancement of a nation through infrastructure development that leads to economic growth. They are planned carefully to accomplish certain goals. However, not all the projects achieved the goals as per planned. Many factors contribute to the successes and failures, and it becomes an interesting arena for research. The primary objective of this paper is to outline the development trend of project success measurement globally and locally. The research method employed was to make selected reviews on critical success factors' (CSFs literature and to compare international standards and progress in incorporating human behavioural aspects of project management to the situation in Malaysia. A somewhat similar pattern can be observed in Malaysia where the studies have departed from the usual criteria of time, cost and quality, to define project success in a more holistic way. However, the domestic industry has failed to respond to the emerging trend globally as there has yet been any widely published research on the importance of human-related factors towards project success. A consolidated framework of CSFs has therefore, been proposed in responding to the findings. This paper fulfils an identified need as there has been a dearth of research on the subject matter locally.
Foote, Jan M; Conley, Virginia; Williams, Janet K; McCarthy, Ann Marie; Countryman, Michele
2015-07-01
Navigating the regulations to protect human subjects and private health information for Doctor of Nursing Practice (DNP) projects can be a formidable task for students, faculty, and the institutional review board (IRB). Key stakeholders from the University of Iowa College of Nursing and the Human Subjects Office developed a standardized process for DNP students to follow, using a decision algorithm, a student orientation to the human subjects review process conducted by faculty and IRB chairs and staff, and a brief Human Subjects Research Determination form. Over 2 years, 109 students completed the process, and 96.3% of their projects were deemed not to be human subjects research. Every student submitted documentation of adherence to the standardized process. Less time was spent by students, faculty, and the IRB in preparing and processing review requests. The interprofessional collaboration resulted in a streamlined process for the timely review of DNP projects. Copyright 2015, SLACK Incorporated.
Epstein, J.; Lind, P.
2017-12-01
Secondary channels provide critical off-channel habitat for key life stages of aquatic species. In many systems, interruption of natural processes via anthropogenic influences have reduced the quantity of secondary channel habitat and have impaired the processes that help form and maintain them. Creation and enhancement of secondary channels is therefore a key component of stream rehabilitation, particularly in the Pacific Northwest where the focus has been on enhancement of habitat for ESA-listed salmonids. Secondary channel enhancement varies widely in scope, scale, and approach depending on species requirements, hydrology/hydraulics, geomorphologic setting, sediment dynamics, and human constraints. This presentation will review case studies from numerous secondary channel projects constructed over the last 20 years by different entities and in different settings. Lessons learned will be discussed that help to understand project performance and inform future project design. A variety of secondary channel project types will be reviewed, including mainstem flow splits, year-round flow through, seasonally activated, backwater alcove, natural groundwater-fed, and engineered groundwater-fed (i.e. groundwater collection galleries). Projects will be discussed that span a range of project construction intensities, such as full excavation of side channels, select excavation to increase flow, or utilizing mainstem structures to activate channels. Different configurations for connecting to the main channel, and their relative performance, will also be presented. A variety of connection types will be discussed including stabilized channel entrance, free-formed entrance, using bar apex jams to split flows, using `bleeder' jams to limit secondary channel flow, and obstructing the main channel to divert flows into secondary channels. The performance and longevity of projects will be discussed, particularly with respect to the response to sediment mobilizing events. Lessons
End user orientation of TC projects. Special evaluation review
International Nuclear Information System (INIS)
1996-12-01
The present review of the end use orientation of TC projects was undertaken as requested by the TC Department to identify: (a) end users and beneficiaries beyond the boundaries of the counterpart laboratories, as appropriate; (b) means provided or planned to reach the end users and beneficiaries; (c) performance indicators in quantifiable terms, including those related to the counterpart activities that could be foreseen during and after completion of Agency assistance; and (d) recommendations of additional means, if necessary, to reach the end users and beneficiaries. A total of 13 TC projects with large budgets of around $200,000 and above were selected from those first approved under the 1995-1996 biennial programme and supported under the TCF, representing diverse fields of Agency activities and covering all the geographical areas of the Agency's technical co-operation. The projects thus selected were one each from Argentina, Bolivia, Bulgaria, Chile, Colombia, Egypt, Ethiopia, Jordan, Mexico, Mongolia, Slovenia, Turkey and Viet-Nam. The overall budget of the 13 projects as originally approved for 1995 to 1998, amounted to $5,510,980. The current budget as of 8 November 1996 stands at $5,446,719, representing a decrease of more than one percent. Figs, tabs
International Nuclear Information System (INIS)
1985-04-01
This six-volume compilation contains over 1000 reports prepared by the Advisory Committee on Reactor Safeguards from September 1957 through December 1984. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and within project name by chronological order. Part 2 categorizes the reports by the most appropriate generic subject area and within subject area by chronological order. This volume contains project reviews arranged alphabetically from A to F
Pep-up: A review of the Umgeni Valley Project evaulation process ...
African Journals Online (AJOL)
Pep-up: A review of the Umgeni Valley Project evaulation process. Tim Wright. Abstract. No Abstract. Full Text: EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT · Creative Commons License This work is licensed under a Creative Commons Attribution 3.0 License.
Review of induced seismic hazard for Hot Dry Rock Project, Rosemanowes, Cornwall
International Nuclear Information System (INIS)
Skipp, B.O.; Woo, G.; Eldred, P.J.L.
1991-01-01
Geothermal energy installations perturb the earth's crust and so may provoke earthquakes. The 21st Dry Rock (HDR) Geothermal Project at Rosemanowes Quarry in Cornwall has given rise to low level unfelt acoustic emission and possibly small, felt earthquakes. This review of induced seismic hazard study examines the effects that the HDR Project could have on seismic events. Events which are modified by the project, in magnitude and time of occurrence, as well as those which might not have occurred at all were studied. From an examination of the literature and relevant seismicity models, a broad estimate of induced seismic hazard was established. (U.K)
Resource-constrained project scheduling problem: review of past and recent developments
Directory of Open Access Journals (Sweden)
Farhad Habibi
2018-01-01
Full Text Available The project scheduling problem is both practically and theoretically of paramount importance. From the practical perspective, improvement of project scheduling as a critical part of project management process can lead to successful project completion and significantly decrease of the relevant costs. From the theoretical perspective, project scheduling is regarded as one of the in-teresting optimization issues, which has attracted the attention of many researchers in the area of operations research. Therefore, the project scheduling issue has been significantly evaluated over time and has been developed from various aspects. In this research, the topics related to Re-source-Constrained Project Scheduling Problem (RCPSP are reviewed, recent developments in this field are evaluated, and the results are presented for future studies. In this regard, first, the standard problem of RCPSP is expressed and related developments are presented from four as-pects of resources, characteristics of activities, type of objective functions, and availability level of information. Following that, details about 216 articles conducted on RCPSP during 1980-2017 are expressed. At the end, in line with the statistics obtained from the evaluation of previ-ous articles, suggestions are made for the future studies in order to help the development of new issues in this area.
Review of issues and challenges for public private partnership (PPP) project performance in Malaysia
Hashim, H.; Che-Ani, A. I.; Ismail, K.
2017-10-01
Public Private Partnership (PPP) in Malaysia aims to stimulate economic growth and overcome the weakness of conventional system. Over the years, many critics have been reported along the massive growth of PPP project development. Within that context, this study provides a review of issues and challenges for PPP pertaining to project performance in Malaysia. The study also attempts to investigate four performance measurement models around the globe as a basis for improvement of PPP in Malaysia. A qualitative method was used to analyse literature review from previous published literatures while comparative analysis was carried out within the models to identify their advantages and disadvantages. The findings show that the issues and challenges occurred were related to human, technical and financial factor that could hinder the implementation of PPP project in Malaysia. From the analysis, KPIs, guideline / framework, risk allocation, efficiency & flexibility are perceived as dominant issues. Finally, the findings provide an informed basis on the opportunity areas to be considered for improvement in order to achieved project effectiveness.
International Nuclear Information System (INIS)
1999-08-01
The International Review Committee composed of twelve Japanese and foreign experts was set up under the Research Evaluation Committee of JAERI, and has reviewed the proposed joint project combining JAERI's Neutron Science Project and KEK's Japan Hadron Facility into one major facility. The review meeting took place on April 26-27, 1999, at JAERI Head quarters, Tokyo. According to the points of review given in advance, the review was implemented based on the joint project report submitted and presentations of both institutions. The Research Evaluation Committee received the review report and its explanations from the Review Committee on July 5. The Research Evaluation Committee has acknowledged appropriateness of the review results. This report describes the review results. (author)
Demonstrating sustainable energy: A review-based model of sustainable energy demonstration projects
Bossink, Bart
2017-01-01
This article develops a model of sustainable energy demonstration projects, based on a review of 229 scientific publications on demonstrations in renewable and sustainable energy. The model addresses the basic organizational characteristics (aim, cooperative form, and physical location) and learning
1990 DOE/SANDIA crystalline photovoltaic technology project review meeting
Energy Technology Data Exchange (ETDEWEB)
Ruby, D.S. (ed.)
1990-07-01
This document serves as the proceedings for the annual project review meeting held by Sandia's Photovoltaic Cell Research Division and Photovoltaic Technology Division. It contains information supplied by each organization making a presentation at the meeting, which was held August 7 through 9, 1990 at the Sheraton Hotel in Albuquerque, New Mexico. Sessions were held to discuss national photovoltaic programs, one-sun crystalline silicon cell research, concentrator silicon cell research, concentrator 3-5 cell research, and concentrating collector development.
Project for review of nuclear energy in the Netherlands
International Nuclear Information System (INIS)
Jong, J.J. de
1988-03-01
In consequence of the accident national as well as international activities have been undertaken, in particular in the areas of reactor safety and environmental impacts. The international activities were concentrated at IAEA in Vienna, NEA in Paris and the EG. Nationally regarded the accident has induced the project Review and the working plan for rounding-off Chernobylsk. In general it could be noted that one has learned lessons from the accident in the areas of reactor safety and environmental impacts. 22 refs
42 CFR 137.294 - What is the typical IHS environmental review process for construction projects?
2010-10-01
... SELF-GOVERNANCE Construction Nepa Process § 137.294 What is the typical IHS environmental review... impact on the environment, and therefore do not require environmental impact statements (EIS). Under current IHS procedures, an environmental review is performed on all construction projects. During the IHS...
Sakahara, Robert; Hackenberg, Davis; Johnson, William
2017-01-01
This presentation was presented to the Integrated Aviation Systems Program at the FY17 Annual Review of the UAS-NAS project. The presentation captures the overview of the work completed by the UAS-NAS project and its subprojects.
Energy Technology Data Exchange (ETDEWEB)
Howerton, Jack; Hwang, Diana
1984-11-01
This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.
The 1991 DOE/Sandia Crystalline Photovoltaic Technology Project Review Meeting
Whipple, M. L.
1991-07-01
This document serves as the proceedings for the manual project review meeting held by Sandia's Photovoltaic Technology Research Division. It contains information supplied by each organization making a presentation at the meeting, which was held July 30 through 31, 1991 at the Sheraton Hotel in Albuquerque, New Mexico. Sessions were held to discuss national photovoltaic programs, one-sun crystalline silicon cell research, concentrator silicon cell research, and concentrating collector development.
Poverty alleviation project review
CSIR Research Space (South Africa)
Braun, AL
2003-01-01
Full Text Available seven pure cashmere rams from project. EC (Emerging farmers) farmers have also received 43 upgraded cashmere rams from Dept. of Agric. EC From the plus minus 1800 goats involved in the project at least 450 kids / offspring of the improved goats have been...
Auditory hallucinations: A review of the ERC "VOICE" project.
Hugdahl, Kenneth
2015-06-22
In this invited review I provide a selective overview of recent research on brain mechanisms and cognitive processes involved in auditory hallucinations. The review is focused on research carried out in the "VOICE" ERC Advanced Grant Project, funded by the European Research Council, but I also review and discuss the literature in general. Auditory hallucinations are suggested to be perceptual phenomena, with a neuronal origin in the speech perception areas in the temporal lobe. The phenomenology of auditory hallucinations is conceptualized along three domains, or dimensions; a perceptual dimension, experienced as someone speaking to the patient; a cognitive dimension, experienced as an inability to inhibit, or ignore the voices, and an emotional dimension, experienced as the "voices" having primarily a negative, or sinister, emotional tone. I will review cognitive, imaging, and neurochemistry data related to these dimensions, primarily the first two. The reviewed data are summarized in a model that sees auditory hallucinations as initiated from temporal lobe neuronal hyper-activation that draws attentional focus inward, and which is not inhibited due to frontal lobe hypo-activation. It is further suggested that this is maintained through abnormal glutamate and possibly gamma-amino-butyric-acid transmitter mediation, which could point towards new pathways for pharmacological treatment. A final section discusses new methods of acquiring quantitative data on the phenomenology and subjective experience of auditory hallucination that goes beyond standard interview questionnaires, by suggesting an iPhone/iPod app.
International Nuclear Information System (INIS)
Ben Belfadhel, M.; Bennett, D.G.; Metcalf, P.; Nys, V.; Goldammer, W.
2008-01-01
The IAEA has been conducting two co-ordinated research programmes (CRPs) projects to develop and apply improved safety assessment methodologies for near-surface radioactive waste disposal facilities. The more recent of these projects, ASAM (application of safety assessment methodologies), included a Regulatory Review Working Group (RRWG) which has been working to develop guidance on how to gain confidence in safety assessments and safety cases, and on how to conduct regulatory reviews of safety assessments. This paper provides an overview of the ASAM project, focusing on the safety case and regulatory review. (authors)
Energy Technology Data Exchange (ETDEWEB)
Allee, Brian J. (Columbia Basin Fish and Wildlife Authority, Portland, OR)
1997-06-26
Abstracts are presented from the 1997 Columbia Basin Fish and Wildlife Program Review of Projects. The purpose was to provide information and education on the approximate 127 million dollars in Northwest electric ratepayer fish and wildlife mitigation projects funded annually.
International Nuclear Information System (INIS)
Boes, K.A.
1998-01-01
This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's AN Valve Pit Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314, Tank Farm Restoration and Safe Operations, is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farms' waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first package to be performed is the AN Valve Pit Upgrades package. The scope of the modifications includes new pit cover blocks, valve manifolds, leak detectors, transfer line connections (for future planned transfer lines), and special protective coating for the 241-AN-A and 241-AN-B valve pits
Wang, Haibin; Zhou, Peilin; Wang, Zhongcheng
2017-06-01
Concern about global climate change is growing, and many projects and researchers are committed to reducing greenhouse gases from all possible sources. International Maritime (IMO) has set a target of 20% CO2 reduction from shipping by 2020 and also presented a series of carbon emission reduction methods, which are known as Energy Efficiency Design Index (EEDI) and Energy Efficiency Operation Indicator (EEOI). Reviews on carbon emission reduction from all industries indicate that, Carbon Capture and Storage (CCS) is an excellent solution to global warming. In this paper, a comprehensive literature review of EEDI and EEOI and CCS is conducted and involves reviewing current policies, introducing common technologies, and considering their feasibilities for marine activities, mainly shipping. Current projects are also presented in this paper, thereby illustrating that carbon emission reduction has been the subject of attention from all over the world. Two case ship studies indicate the economic feasibility of carbon emission reduction and provide a guide for CCS system application and practical installation on ships.
The development of biodiversity conservation measures in China's hydro projects: A review.
Bai, Ruiqiao; Liu, Xuehua; Liu, Xiaofei; Liu, Lanmei; Wang, Jianping; Liao, Sihui; Zhu, Annah; Li, Zhouyuan
2017-11-01
The hydropower capacity of China ranks first in the world and accounts for approximately 20% of the total energy production in the country. While hydropower has substantially contributed to meeting China's renewable energy targets and providing clean energy to rural areas, the development of hydropower in China has been met with significant controversy. Ecologically, hydro projects alter the landscape, with potential impacts to the country's aquatic biodiversity. Over the past four decades in China, various mainstream opinions and misunderstandings have been presented concerning how to alleviate the negative impacts of hydro projects on aquatic ecosystems. This article reviews research concerning potential mitigation measures to enhance aquatic biodiversity conservation in hydro projects in China. Based on the academic attention such research has attracted, three technical measures for aquatic biodiversity conservation are considered: (1) fish passages, (2) restocking efforts and (3) river and lake renovations. This article provides a historical comparison of these three practices in China to demonstrate the advantages and disadvantages of each method. The article also reviews the relevant legislation, regulations and technical guidelines concerning China's hydro projects dating back to 1979. The dynamics in research, publications, and patents concerning these three mitigation measures are summarized to demonstrate their technological developments in the context of legislative and policy advances. Data were gathered through the China Knowledge Resource Integrated Database and the State Intellectual Property Office of the People's Republic of China. Based on the analysis provided, the article recommends an expansion of China's environmental certification system for hydro projects, more robust regional legislation to bolster the national framework, the cooperation between upstream and downstream conservation mechanisms, and better monitoring to determine the efficacy
The Ongkharak Nuclear Research Center (ONRC) research reactor project: a status review
International Nuclear Information System (INIS)
Rusch, R.; Jacobi, A. Jr.; Yamkate, P.
2001-01-01
The new Ongkharak Nuclear Research Center in the vicinity of Bangkok, Thailand is planned to replace the more than 30 years old facilities located in the Chatuchak district, Bangkok. An international team led by general atomics (GA) is designing and constructing the new research complex. It comprises a 10 MW TRIGA type reactor, an isotope production and a centralized waste processing and storage facility. Electrowatt-Ekono Ltd. was hired by the Thai Government Agency, the Office of Atomic Energy for Peace (OAEP), as a consultant to the project. As the project is now approaching the end of its 4 th year, it now stands at a decisive turning point. Basic design is nearly completed and detailed design is well advanced. The turnkey part of the contract including the reactor island, the isotope and waste facilities are still awaiting the issuance of the Construction Permit. Significant progress has been made on the other part of the project, which includes all the supporting infrastructure facilities. The Preliminary Safety Analysis Report (PSAR), prepared by GA, has been reviewed by various parties, including by nuclear safety experts from the IAEA, which has provided continuous support to the OAEP. Experts from the Argonne National Laboratory have been involved in the reviews as well. The PSAR is now under consideration at the Nuclear Facility Safety Sub-Committee (NFSS) of the Thai Atomic Energy for Peace Commission for issuing the Construction Permit of the ONRC Research Reactor. The following paper gives an overview of the project and its present status, outlining the features of the planned facilities and the issues the project is presently struggling with. Major lessons of the past 4 years are highlighted and an outlook into the future is attempted. (orig.)
Gorman, Dennis M
2014-08-01
This paper critically reviews the published evidence pertaining to Project Towards No Drug Abuse (Project TND). Publications from seven evaluation studies of Project TND are reviewed, and the results from these are discussed as related to the following outcomes: main effects on the use of cigarettes, alcohol and marijuana; main effects on the use of "hard drugs," defined in the evaluations as cocaine, hallucinogens, stimulants, inhalants, ecstasy and other drugs (e.g., depressants, PCP, steroids and heroin); subgroup and interaction analyses of drug use; and violence-related behaviors. Very few main effects have been found for cigarette, alcohol and marijuana use in the Project TND evaluations. While studies do report main effects for hard drug use, these findings are subject to numerous threats to validity and may be attributable to the data analyses employed. Similarly, while isolated subgroup and interaction effects were found for alcohol use among baseline nonusers and some violence-related behaviors in the early Project TND evaluations, these findings have not been replicated in more recent studies and may result from multiple comparisons between study conditions. In conclusion, there is little evidence to support the assertion that Project TND is an effective drug or violence prevention program. The broader implications of these findings for prevention science are discussed and suggestions are made as to how the quality of research in the field might be improved.
Design review report: 200 East upgrades for Project W-314, tank farm restoration and safe operations
International Nuclear Information System (INIS)
Boes, K.A.
1998-01-01
This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's 200 East (200E) Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314 is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farm waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first design package (AN Valve Pit Upgrades) was completed in November 1997, and the associated design verification activities are documented in HNF-1893. The second design package, 200 East (200E) Upgrades, was completed in March 1998. This design package identifies modifications to existing valve pits 241-AX-B and 241-A-B, as well as several new waste transfer pipelines to be constructed within the A Farm Complex of the 200E Area. The scope of the valve pit modifications includes new pit cover blocks, valve
A review on disaster risk mitigation in the oil and gas project
Rodhi, N. N.; Anwar, N.; Wiguna, I. P. A.
2018-01-01
In addition to the very complex risks, hazards potentially lead to disasters in the oil and gas projects. These risks can certainly be anticipated with the application of risk management, but an unsystematic and ineffective implementation of risk management will still bring adverse impacts. According to the eleven risk management principles in ISO 31000:2009, the application of risk management must pay attention to all aspects, both internal and external factors. Thus, this paper aims to identify variables that could affect the disaster mitigation efforts of oil and gas projects. This research began with literature study to determine the problems of risk management in oil and gas projects, so the affecting variables as the study objectives can be specified subsequently based on the literature review as well. The variables that must be considered in the efforts of disaster risk mitigation of oil and gas project are the risk factors and sustainability aspect.
The Iodine Satellite (iSat) Project Development Towards Critical Design Review (CDR)
Dankanich, John W.; Selby, Michael; Polzin, Kurt A.; Kamhawi, Hani; Hickman, Tyler; Byrne, Larry
2016-01-01
Despite the prevalence of Small Satellites in recent years, the systems flown to date have very limited propulsion capability. SmallSats are typically secondary payloads and have significant constraints for volume, mass, and power in addition to limitations on the use of hazardous propellants or stored energy (i.e. high pressure vessels). These constraints limit the options for SmallSat maneuverability. NASA's Space Technology Mission Directorate approved the iodine Satellite flight project for a rapid demonstration of iodine Hall thruster technology in a 12U configuration under the Small Spacecraft Technology Program. The project formally began in FY15 as a partnership between NASA MSFC, NASA GRC, and Busek Co, Inc., with the Air Force supporting the propulsion technology maturation. The team is in final preparation of the Critical Design Review prior to initiating the fabrication and integration phase of the project. The iSat project is on schedule for a launch opportunity in November 2017.
The Iodine Satellite (iSat) Project Development Towards Critical Design Review
Dankanich, John W.; Calvert, Derek; Kamhawi, Hani; Hickman, Tyler; Szabo, James; Byrne, Lawrence
2015-01-01
Despite the prevalence of small satellites in recent years, the systems flown to date have very limited propulsion capability. SmallSats are typically secondary payloads and have significant constraints for volume, mass, and power in addition to limitations on the use of hazardous propellants or stored energy. These constraints limit the options for SmallSat maneuverability. NASA's Space Technology Mission Directorate approved the iodine Satellite flight project for a rapid demonstration of iodine Hall thruster technology in a 12U (cubesat units) configuration under the Small Spacecraft Technology Program. The mission is a partnership between NASA MSFC, NASA GRC, and Busek Co, Inc., with the Air Force supporting the propulsion technology maturation. The team is working towards the critical design review in the final design and fabrication phase of the project. The current design shows positive technical performance margins in all areas. The iSat project is planned for launch readiness in the spring of 2017.
Barriers to Implementing the ACGME Outcome Project: A Systematic Review of Program Director Surveys.
Malik, Mohammad U; Diaz Voss Varela, David A; Stewart, Charles M; Laeeq, Kulsoom; Yenokyan, Gayane; Francis, Howard W; Bhatti, Nasir I
2012-12-01
The Accreditation Council for Graduate Medical Education (ACGME) introduced the Outcome Project in July 2001 to improve the quality of resident education through competency-based learning. The purpose of this systematic review is to determine and explore the perceptions of program directors regarding challenges to implementing the ACGME Outcome Project. We used the PubMed and Web of Science databases and bibliographies for English-language articles published between January 1, 2001, and February 17, 2012. Studies were included if they described program directors' opinions on (1) barriers encountered when attempting to implement ACGME competency-based education, and (2) assessment methods that each residency program was using to implement competency-based education. Articles meeting the inclusion criteria were screened by 2 researchers. The grading criterion was created by the authors and used to assess the quality of each study. The survey-based data reported the opinions of 1076 program directors. Barriers that were encountered include: (1) lack of time; (2) lack of faculty support; (3) resistance of residents to the Outcome Project; (4) insufficient funding; (5) perceived low priority for the Outcome Project; (6) inadequate salary incentive; and (7) inadequate knowledge of the competencies. Of the 6 competencies, those pertaining to patient care and medical knowledge received the most responses from program directors and were given highest priority. The reviewed literature revealed that time and financial constraints were the most important barriers encountered when implementing the ACGME Outcome Project.
Project Management and the Project Manager: A Strategy for ...
African Journals Online (AJOL)
International Journal of Development and Management Review ... collapse, project failure, project abandonment, project cost and time overruns, etc. ... component parts that constitute project management in the building construction industry.
Ethics Review for a Multi-Site Project Involving Tribal Nations in the Northern Plains.
Angal, Jyoti; Petersen, Julie M; Tobacco, Deborah; Elliott, Amy J
2016-04-01
Increasingly, Tribal Nations are forming ethics review panels, which function separately from institutional review boards (IRBs). The emergence of strong community representation coincides with a widespread effort supported by the U.S. Department of Health & Human Services and other federal agencies to establish a single IRB for all multi-site research. This article underscores the value of a tribal ethics review board and describes the tribal oversight for the Safe Passage Study-a multi-site, community-based project in the Northern Plains. Our experience demonstrates the benefits of tribal ethics review and makes a strong argument for including tribal oversight in future regulatory guidance for multi-site, community-based research. © The Author(s) 2016.
Key factors of project success in family small and medium-sized companies: the theoretical review
Directory of Open Access Journals (Sweden)
Sinisa Arsic
2017-10-01
Full Text Available The paper proposes a systematization of the key success factors of projects, through the theoretical review of family-owned companies operating in the EU market. It is the small and medium companies that in their own way contribute to the overall success of the national economy in terms of economic activity, increased employment, development activities and defining better business environment. The theoretical review observed numerous studies of family businesses, and the contribution of this work is in the systematization of the results of previous research – over three horizons, i.e., over the role of managers in the creation of successful projects (or owner if it is a family enterprise, institutional support for companies in Serbia and the EU, specific industries and the parent (regional markets where a family company operates. Project management, as a general representation of the concept of implementation of strategic and operational endeavors, contains many specifics in terms of critical success factors of projects depending on the environment in which they are implemented. The goal of the paper is reflected in the identification and presentation of critical success factors of projects implemented in family companies. The paper concludes with a discussion of the research results in relation to the existing, similar research studies, as well as with the announcement of future research, which will examine the conclusions drawn on a real sample.
Army Corps of Engineers: Peer Review Process for Civil Works Project Studies Can Be Improved
2012-03-01
exceeding $45 million EIS Cost of peer review contract Western C-111 Spreader Canal Project Implementation Report Jacksonville South...Federal Programs Congressional Relations Public Affairs Please Print on Recycled Paper.
International Nuclear Information System (INIS)
Klos, Richard; Wilmot, Roger
2002-09-01
The Swedish Nuclear Fuel and Waste Management Company's (SKB's) most recent assessment of the safety of the Forsmark repository for low-level and intermediate-level waste (Project SAFE) is currently undergoing review by the Swedish regulators. As part of its review, the Swedish Radiation Protection Institute (SSI) identified that two components of SAFE require more detailed review: (i) the conceptual model description of the biosphere system, and (ii) SKB's risk assessment methodology. We have reviewed the biosphere system interaction matrix and how this has been used in the identification, justification and description of biosphere models for radiological assessment purposes. The risk assessment methodology has been reviewed considering in particular issues associated with scenario selection, assessment timescale, and the probability and risk associated with the well scenario. There is an extensive range of supporting information on which biosphere modelling in Project SAFE is based. However, the link between this material and the biosphere models themselves is not clearly set out. This leads to some contradictions and mis-matches between description and implementation. One example concerns the representation of the geosphere-biosphere interface. The supporting description of lakes indicates that interaction between groundwaters entering the biosphere through lake bed sediments could lead to accumulations of radionuclides in sediments. These sediments may become agricultural areas at some time in the future. In the numerical modelling of the biosphere carried out in Project SAFE, the direct accumulation of contaminants in bed sediments is not represented. Application of a more rigorous procedure to ensure numerical models are fit for purpose is recommended, paying more attention to issues associated with the geosphere-biosphere interface. A more structured approach to risk assessment would be beneficial, with a better explanation of the difference between
Project Communications Management
José C. Santiago-Guevara; Mauricio Rojas-Contreras; Luis A. Esteban-Villamizar
2013-01-01
This article presents a review in relation to the object of study: Communications Management as an important factor in the management of projects. The review includes the most relevant and most renowned authors in the field of project management, focusing on telecommunications projects, which lets you define a communications management model.
Project Success in IT Project Management
Siddiqui, Farhan Ahmed
2010-01-01
The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...
Directory of Open Access Journals (Sweden)
Brooks Jeremy
2013-01-01
Full Text Available Abstract Background Community-based conservation (CBC promotes the idea that long-term conservation success requires engaging with, and providing benefits for local communities. Though widespread, CBC projects are not always successful or free of controversy. With criticisms on all sides of the conservation debates, it is critical to have a better understanding of (1 whether CBC is an effective conservation tool, and (2 of the factors associated with the success or failure of CBC projects, and the scale at which these factors operate. Recent CBC reviews have typically examined only a single resource domain, have limited geographic scope, consider only one outcome, or ignore the nested nature of socioecological systems. To remedy these issues, we use a newly coded global comparative database of CBC projects identified by systematic review to evaluate success in four outcome domains (attitudes, behaviors, ecological, economic and explore synergies and tradeoffs among these outcomes. We test hypotheses about how features of the national context (H-NC, project design (H-PD, and local community characteristics (H-CC affect these four measures of success. Methods To add to a sample of 62 projects that we used from previous systematic reviews, we systematically searched the conservation literature using six terms in four online databases. To increase the number of projects for each country in order to conduct a multilevel analysis, we also conducted a secondary search using the Advancing Conservation in a Social Context online library. We coded projects for 65 pieces of information. We conducted bivariate analyses using two-dimensional contingency tables and proportional odds logistic regression and conducted multivariate analyses by fitting reduced form proportional odds logistic regression models that were selected using a forward stepwise AIC approach. Results The primary and secondary searches produced 74 new projects to go along with the 62
Review of the TMI-2 accident evaluation and vessel investigation projects
Energy Technology Data Exchange (ETDEWEB)
Ladekarl Thomsen, Knud
1998-03-01
The results of the TMI-2 Accident Evaluation Programme and the Vessel Investigation Project have been reviewed as part of a literature study on core meltdown and in-vessel coolability. The emphasis is placed on the late phase melt progression, which is of special relevance to the NKS-sponsored RAK-2.1 project on Severe Accident Phenomenology. The body of the report comprises three main sections, The TMI-2 Accident Scenario, Core Region and Relocation Path Investigations, and Lower Head Investigations. In the final discussion, the lower head gap formation mechanism is explained in terms of thermal contraction and fracturing of the debris crust. This model seems more plausible than the MAAP model based on creep expansion of the lower head. (au) 1 tab., 33 ills., 31 refs.
Athens automation and control experiment project review meeting, Dallas, Texas, December 5-6, 1984
Energy Technology Data Exchange (ETDEWEB)
Detwiler, J.S.; Hu, P.S.; Lawler, J.S.; Markel, L.C.; McIntyre, J.M.; McKinley, K.F.; Monteen, L.D.; Purucker, S.L.; Reed, J.H.; Rizy, D.T.
1985-12-01
The AACE is an electric power distribution automation project involving research and development of both hardware and software. Equipment for the project is being installed on the electric distribution system of the Athens Utilities Board (AUB), located in Athens, Tennessee. Purposes of the AACE are to develop and test load control, volt/var control, and system reconfiguration capabilities on an electric distribution system and to transfer what is learned to the electric utility industry. Expected benefits include deferral of costly power generation plants and increased electric service reliability. A project review meeting was held to review the progress of the AACE and to communicate the objectives and experimental plans to the electric utility industry. At the time of the meeting, the experimental test plans were being written; much of the AACE field equipment had been received by AUB, and installation had begun. A computer system, the AACE Test System (AACETS), was already operational at ORNL. AACETS will be used to develop and test applications software and experimental control strategies prior to their implementation on the AUB system. The AACE experiments are scheduled to begin in October 1985 and to continue through October 1987.
2010-10-01
... Water Supply Program reviewed by the Administration? 404.51 Section 404.51 Public Lands: Interior... SUPPLY PROGRAM Feasibility Studies § 404.51 Are proposed projects under the Rural Water Supply Program... the Reclamation's Rural Water Supply Program. This includes review under Executive Order 12322 to...
Review of PV Inverter Technology Cost and Performance Projections
Energy Technology Data Exchange (ETDEWEB)
Navigant Consulting Inc.
2006-01-01
The National Renewable Energy Laboratory (NREL) has a major responsibility in the implementation of the U.S. Department of Energy's (DOE's) Solar Energy Technologies Program. Sandia National Laboratories (SNL) has a major role in supporting inverter development, characterization, standards, certifications, and verifications. The Solar Energy Technologies Program recently published a Multiyear Technical Plan, which establishes a goal of reducing the Levelized Energy Cost (LEC) for photovoltaic (PV) systems to $0.06/kWh by 2020. The Multiyear Technical Plan estimates that, in order to meet the PV system goal, PV inverter prices will need to decline to $0.25-0.30 Wp by 2020. DOE determined the need to conduct a rigorous review of the PV Program's technical and economic targets, including the target set for PV inverters. NREL requested that Navigant Consulting Inc.(NCI) conduct a review of historical and projected cost and performance improvements for PV inverters, including identification of critical barriers identified and the approaches government might use to address them.
TWTF project criticality task force final review and assessment
International Nuclear Information System (INIS)
McKinley, K.B.; Cannon, J.W.; Wheeler, F.J.; Worle, H.A.
1980-11-01
The Transuranic Waste Treatment Facility (TWTF) is being developed to process transuranic waste, stored and buried at the Idaho National Engineering Laboratory, into a chemically inert, physically stable basalt-like residue acceptable at a federal repository. A task force was assembled by the TWTF Project Division to review and assess all aspects of criticality safety for the TWTF. This document presents the final review, assessments, and recommendations of this task force. The following conclusions were made: Additional criticality studies are needed for the entire envelope of feed compositions and temperature effects. Safe operating k/sub eff/'s need to be determined for process components. Criticality analyses validation experiments may also be required. SRP neutron interrogation should be replaced by DDT neutron interrogation. Accuracy studies need to be performed for the proposed assaying techniques. Time-correlated neutron monitoring needs to be mocked up for process components to prove feasibility and determine accuracy. The criticality control techniques developed for the TWTF conceptual design are in compliance with ERDAM 0530, including the Double Contingency Rule. Detailed procedures and controls need to be developed
[Nuclear energy and environment: review of the IAEA environmental projects].
Fesenko, S; Fogt, G
2012-01-01
The review of the environmental projects of the International Atomic Energy Agency is presented. Basic IAEA documents intended to protect humans and the Environment are considered and their main features are discussed. Some challenging issues in the area of protection of the Environment and man, including the impact of nuclear facilities on the environment, radioactive waste management, and remediation of the areas affected by radiological accidents, nuclear testing and sites of nuclear facilities are also discussed. The need to maintain the existing knowledge in radioecology and protection of the environment is emphasised.
Fleischer, Hakan
2012-01-01
The aim of this article is to review cross-disciplinary accumulated empirical research on one-to-one computer projects in school settings as published in peer-reviewed journals between 2005 and 2010, particularly the results of teacher- and pupil-oriented studies. Six hundred and five research articles were screened at the abstract and title…
Vague project start makes project success of outsourced software development projects uncertain
Savolainen, Paula
2010-01-01
peer-reviewed A definition of a project success includes at least three criteria: 1) meeting planning goals, 2) customer benefits, and 3) supplier benefits. This study aims to point out the importance of the definition of the project start, the project start date, and what work should be included in the project effort in order to ensure the supplier's benefits. The ambiguity of the project start risks the profitability of the project and therefore makes project success at least from suppli...
International Nuclear Information System (INIS)
Oakes, T.W.
1989-01-01
This paper shows the cost/benefit mechanism used for applying the theory and practical aspects of QA principles as a management tool to project management of environmental cleanup projects. This includes reviewing and guidelines and requirements to determine the practical aspects of applying these requirements to environmental project management. Thus, there is a feedback loop for comparison of the cost/benefits of application of each stage of the project. The project's major stages include planning, environmental sampling, analysis of data samples, data/information management to include reporting, and follow- up, post-cleanup sampling with continued data management. A comparison is also made of the theory with the practical aspects of each of these stages
Phase V storage (Project W-112) Central Waste Complex operational readiness review, final report
International Nuclear Information System (INIS)
Wight, R.H.
1997-01-01
This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included
DEFF Research Database (Denmark)
Hansen, Lars Kristian
2014-01-01
These years increasing interest is put on IT project portfolio management (IT PPM). Considering IT PPM an interdisciplinary practice, this paper conducts a concept-based literature review of relevant articles across various research disciplines. It finds and classifies a stock of 107 relevant...
Phase 5 storage (Project W-112) Central Waste Complex operational readiness review, final report
Energy Technology Data Exchange (ETDEWEB)
Wight, R.H.
1997-05-30
This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included.
Atmospheric Ionizing Radiation (AIR) Project Review
Singleterry, R. C., Jr.; Wilson, J. W.; Whitehead, A. H.; Goldhagen, P. E.
1999-01-01
The National Council on Radiation Protection and Measurement (NCRP) and the National Academy of Science (NAS) established that the uncertainty in the data and models associated with the high-altitude radiation environment could and should be reduced. In response, the National Aeronautics and Space Administration (NASA) and the U.S. Department of Energy Environmental Measurements Laboratory (EML) created the Atmospheric Ionizing Radiation (AIR) Project under the auspices of the High Speed Research (HSR) Program Office at the Langley Research Center. NASA's HSR Program was developed to address the potential of a second-generation supersonic transport. A critical element focussed on the environmental issues, including the threat to crew and passengers posed by atmospheric radiation. Various international investigators were solicited to contribute instruments to fly on an ER-2 aircraft at altitudes similar to those proposed for the High Speed Civil Transport (HSCT). A list of participating investigators, their institutions, and instruments with quantities measured is presented. The flight series took place at solar minimum (radiation maximum) with northern, southern, and east/west flights. The investigators analyzed their data and presented preliminary results at the AIR Workshop in March, 1998. A review of these results are included.
DEFF Research Database (Denmark)
Svejvig, Per; Andersen, Peter
2015-01-01
This paper presents the results of a structured review of the rethinking project management (RPM) literature based on the classification and analysis of 74 contributions and in addition takes a critical look at this brave new world. Through the analysis, a total of 6 overarching categories emerged......: contextualization, social and political aspects, rethinking practice, complexity and uncertainty, actuality of projects and broader conceptualization. These categories cover a broad range of different contributions with diverse and alternative perspectives on project management. The early RPM literature dates back...
First NASA Aviation Safety Program Weather Accident Prevention Project Annual Review
Colantonio, Ron
2000-01-01
The goal of this Annual Review was to present NASA plans and accomplishments that will impact the national aviation safety goal. NASA's WxAP Project focuses on developing the following products: (1) Aviation Weather Information (AWIN) technologies (displays, sensors, pilot decision tools, communication links, etc.); (2) Electronic Pilot Reporting (E-PIREPS) technologies; (3) Enhanced weather products with associated hazard metrics; (4) Forward looking turbulence sensor technologies (radar, lidar, etc.); (5) Turbulence mitigation control system designs; Attendees included personnel from various NASA Centers, FAA, National Weather Service, DoD, airlines, aircraft and pilot associations, industry, aircraft manufacturers and academia. Attendees participated in discussion sessions aimed at collecting aviation user community feedback on NASA plans and R&D activities. This CD is a compilation of most of the presentations presented at this Review.
Energy Technology Data Exchange (ETDEWEB)
Kokajko, L.; Skay, D.; Wang, H.; Murphy, D. [Nuclear Regulatory Commission, Washington, DC (United States)
1995-03-01
This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation.
International Nuclear Information System (INIS)
Kokajko, L.; Skay, D.; Wang, H.; Murphy, D.
1995-03-01
This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation
The Great Bear Flare Pit Project : review of work to date
International Nuclear Information System (INIS)
Ridal, J.; Lean, D.; Findlay, S.C.
1998-01-01
Published information regarding potential toxic agents associated with flare emissions and a study to determine the risk posed to Treaty 8 First Nations (T8FN) peoples and wildlife was reviewed as part of the Great Bear Flare Pit Project (GBFPP). The project is concerned with the study of water and soil contamination in the immediate vicinity of flare pits in the Del Rio, Doig basin, Blueberry River, and Halfway River regions of T8FN lands in Alberta. The GBFPP has established good baseline data on metal contamination, and other contaminants such as benzene, toluene, ethylbenzene, xylenes (BTEX) and polycyclic aromatic hydrocarbons (PAHs) in the immediate vicinity of selected flare pits. Based on a critical assessment of reports published to date a series of prioritized recommendations for further research are made. 18 refs., 2 tabs
International Nuclear Information System (INIS)
2001-04-01
The United States Department of Energy (DOE) has a project for characterizing the site of a facility for disposing of radioactive waste located at Yucca Mountain Nevada, USA (the Yucca Mountain Site Characterization Project). This Project has developed an approach for assessing the future potential impact of any releases of radionuclides to the biosphere from a potential disposal facility sited at Yucca Mountain The DOE requested the International Atomic Energy Agency (IAEA) to organize an independent international expert review of the assessment methodology being used in its biosphere modelling programme. The IAEA accepted the request in the context of its statutory obligation to provide for the application of its established international standards of safety for the protection of health, at the request of a State, to any of that State's activities in the field of atomic energy. The terms of reference of the peer review were to review the biosphere assessment methodology being used for the total system performance assessment of the potential disposal facility. The main purpose was to analyze critically the proposed rationale and methodology and to identify consistencies and inconsistencies between methods being used in the frame of the Project and those established in international standards or in international programmes such as the IAEA's Biosphere Modelling and Assessment Programme (BIOMASS). This report presents the consensus view of the international experts convened by the IAEA for carrying out the review
International Nuclear Information System (INIS)
1994-01-01
Snake-bite is one of the high priority health problems in Myanmar, causing high mortality and mobility rates among the rural population. In 1982 the Department of Medical Research (DMR) of the Ministry of Health launched a research programme for the comprehensive studies of snake (Russell's viper) bites and since then various research divisions of the DMR have been actively engaged in both basic and clinical studies aimed at obtaining adequate knowledge of the biochemical, clinical and pathophysiological mechanisms to guide rational management of snake-bite cases. Also, a clinical research unit has been established in a particular area where the incidence of Russell's viper bite is quite high. Project MYA/6/015 was initiated in 1989 with the objective of determining the incidence, facilitating early diagnosis and assessing the value of therapy in hypopituitarism following snake bite, through the measurements of pituitary and adreno-cortical hormones in serum and their changes in response to dynamic tests. The project was completed in July 1993. The review was undertaken upon request by the Asia and Pacific Section, to assess the overall performance of the project
Energy Technology Data Exchange (ETDEWEB)
NONE
1994-03-09
Snake-bite is one of the high priority health problems in Myanmar, causing high mortality and mobility rates among the rural population. In 1982 the Department of Medical Research (DMR) of the Ministry of Health launched a research programme for the comprehensive studies of snake (Russell`s viper) bites and since then various research divisions of the DMR have been actively engaged in both basic and clinical studies aimed at obtaining adequate knowledge of the biochemical, clinical and pathophysiological mechanisms to guide rational management of snake-bite cases. Also, a clinical research unit has been established in a particular area where the incidence of Russell`s viper bite is quite high. Project MYA/6/015 was initiated in 1989 with the objective of determining the incidence, facilitating early diagnosis and assessing the value of therapy in hypopituitarism following snake bite, through the measurements of pituitary and adreno-cortical hormones in serum and their changes in response to dynamic tests. The project was completed in July 1993. The review was undertaken upon request by the Asia and Pacific Section, to assess the overall performance of the project.
Review of the groundwater flow modelling of the Swiss Project Gewaehr
International Nuclear Information System (INIS)
Robinson, P.C.; Jackson, C.P.; Herbert, A.W.; Atkinson, R.
1986-02-01
The authors review the hydrogeological modelling work undertaken by NAGRA (National Co-operative for the Storage of Radioactive Waste) for Project Gewahr (Guarantee). The FEM301 computer code that was used by NAGRA, their general approach to flow simulation and the specific finite-element models employed are all discussed; and the results of a verification are presented using the authors' own computer code NAMMU. Recommendations for improvements in the NAGRA modelling and for areas of future work are made. (author)
Sánchez, Gema Anabel Castillo; Berbey, Aranzazu; de la Torre-Díez, Isabel; López-Coronado, Miguel
2017-07-01
This paper presents a review about Information and Communications Technologies (ICTs) health projects in Panama. The main contribution is to provide a vision of the situation in Panama, allowing an understanding of the dynamics of health policies and how they have affected the implementation of ICT's Projects to improve the health of Panamanians. We analyze the projects found with ICT's in health of Panama, which allow us to see a perspective of projects information is obtained from 2000 to 2016, however it is important to highlight that there may be other projects that we do not know because we did not find enough information or evidence of the same. That is why this review has interviews with key personnel, who have guided us with the search for information. 56% of technology projects are concentrated in the capital city and only 16% in the province of Chiriquí. 64% of these projects are focused on the development of information systems, mainly focused on electronic patient registration. And 60% refers to projects related to primary health care. The MINSA and CSS both with a 20% participation in ICT project, in addition we can notice the dispersion of projects for hospitals, where each one is developing programs per their needs or priorities. The national information about ICT projects of Health, it has been notorious the state of dispersion and segmented of public health information. We consider that it is a natural consequence of Policy in Panamanian Health System. This situation limits the information retrieval and knowledge of ICT in Health of Panama. To stakeholders, this information is directed so that health policies are designed towards a more effective and integral management, administering the ICT's as tools for the well-being of most the Panamanian population, including indigenous group.
DEFF Research Database (Denmark)
Skaates, Maria Anne; Tikkanen, Henrikki
2000-01-01
of the review is upon the connection between focal relationships and the wider environment in which project marketing and systems selling takes place. First, several common definitions of projects and project marketing are presented and discussed. Second, the implications of three specific features of project......Project marketing is an important mode of business-to-business marketing today. This paper assesses recent project marketing contributions, including predominantly those of members of the (mainly European) International Network for Project Marketing and Systems Selling (INPM). The emphasis...... business - discontinuity, uniqueness, and complexity - for the focal relationship and the broader marketing environment are considered at the level of multiple projects. Third, three overlapping types of postures that project-selling firms can adopt in relation to their focal relationships...
Energy Technology Data Exchange (ETDEWEB)
Klos, Richard; Wilmot, Roger [Galson Sciences Ltd (United Kingdom)
2002-09-01
The Swedish Nuclear Fuel and Waste Management Company's (SKB's) most recent assessment of the safety of the Forsmark repository for low-level and intermediate-level waste (Project SAFE) is currently undergoing review by the Swedish regulators. As part of its review, the Swedish Radiation Protection Institute (SSI) identified that two components of SAFE require more detailed review: (i) the conceptual model description of the biosphere system, and (ii) SKB's risk assessment methodology. We have reviewed the biosphere system interaction matrix and how this has been used in the identification, justification and description of biosphere models for radiological assessment purposes. The risk assessment methodology has been reviewed considering in particular issues associated with scenario selection, assessment timescale, and the probability and risk associated with the well scenario. There is an extensive range of supporting information on which biosphere modelling in Project SAFE is based. However, the link between this material and the biosphere models themselves is not clearly set out. This leads to some contradictions and mis-matches between description and implementation. One example concerns the representation of the geosphere-biosphere interface. The supporting description of lakes indicates that interaction between groundwaters entering the biosphere through lake bed sediments could lead to accumulations of radionuclides in sediments. These sediments may become agricultural areas at some time in the future. In the numerical modelling of the biosphere carried out in Project SAFE, the direct accumulation of contaminants in bed sediments is not represented. Application of a more rigorous procedure to ensure numerical models are fit for purpose is recommended, paying more attention to issues associated with the geosphere-biosphere interface. A more structured approach to risk assessment would be beneficial, with a better explanation of the difference
World Bank
2010-01-01
This report provides a gender review of a decade and a half of World Bank infrastructure lending for 1,246 projects. The objective of this review is to assess the status of and trends in gender integration in the World Bank infrastructure portfolio, and to establish a baseline for monitoring and enhancing gender integration in line with commitments made for the 2006 gender action plan. The ...
International Nuclear Information System (INIS)
ARD, K.E.
2000-01-01
This report documents the results of the design verification performed on the Cask and Multiple Canister Over-pack (MCO) Helium Purge System. The helium purge system is part of the Spent Nuclear Fuel (SNF) Project Cask Loadout System (CLS) at 100K area. The design verification employed the ''Independent Review Method'' in accordance with Administrative Procedure (AP) EN-6-027-01
International Nuclear Information System (INIS)
1994-12-01
This document reports on the results of a peer review and evaluation of studies made of potential uses of assets from the terminated Superconducting Super Collider (SSC) project. These project definition studies focused on nine areas of use of major assets and facilities at the SSC site near Waxahachie, Texas. The studies were undertaken as part of the effort to maximize the value of the investment made in the SSC and were supported by two sets of grants, one to the Texas National Research Laboratory Commission (TNRLC) and the second to various universities and other institutions for studies of ideas raised by a public call for expressions of interest. The Settlement Agreement, recently signed by the Department of Energy (DOE) and TNRLC, provides for a division of SSC property. As part of the goal of maximizing the value of the SSC investment, the findings contained in this report are thus addressed to officials in both the Department and TNRLC. In addition, this review had several other goals: to provide constructive feedback to those doing the studies; to judge the benefits and feasibility (including funding prospects) of the projects studied; and to help worthy projects become reality by matching projects with possible funding sources
Energy Technology Data Exchange (ETDEWEB)
NONE
1994-12-01
This document reports on the results of a peer review and evaluation of studies made of potential uses of assets from the terminated Superconducting Super Collider (SSC) project. These project definition studies focused on nine areas of use of major assets and facilities at the SSC site near Waxahachie, Texas. The studies were undertaken as part of the effort to maximize the value of the investment made in the SSC and were supported by two sets of grants, one to the Texas National Research Laboratory Commission (TNRLC) and the second to various universities and other institutions for studies of ideas raised by a public call for expressions of interest. The Settlement Agreement, recently signed by the Department of Energy (DOE) and TNRLC, provides for a division of SSC property. As part of the goal of maximizing the value of the SSC investment, the findings contained in this report are thus addressed to officials in both the Department and TNRLC. In addition, this review had several other goals: to provide constructive feedback to those doing the studies; to judge the benefits and feasibility (including funding prospects) of the projects studied; and to help worthy projects become reality by matching projects with possible funding sources.
4MOST: the 4-metre Multi-Object Spectroscopic Telescope project at preliminary design review
de Jong, Roelof S.; Barden, Samuel C.; Bellido-Tirado, Olga; Brynnel, Joar G.; Frey, Steffen; Giannone, Domenico; Haynes, Roger; Johl, Diana; Phillips, Daniel; Schnurr, Olivier; Walcher, Jakob C.; Winkler, Roland; Ansorge, Wolfgang R.; Feltzing, Sofia; McMahon, Richard G.; Baker, Gabriella; Caillier, Patrick; Dwelly, Tom; Gaessler, Wolfgang; Iwert, Olaf; Mandel, Holger G.; Piskunov, Nikolai A.; Pragt, Johan H.; Walton, Nicholas A.; Bensby, Thomas; Bergemann, Maria; Chiappini, Cristina; Christlieb, Norbert; Cioni, Maria-Rosa L.; Driver, Simon; Finoguenov, Alexis; Helmi, Amina; Irwin, Michael J.; Kitaura, Francisco-Shu; Kneib, Jean-Paul; Liske, Jochen; Merloni, Andrea; Minchev, Ivan; Richard, Johan; Starkenburg, Else
2016-01-01
We present an overview of the 4MOST project at the Preliminary Design Review. 4MOST is a major new wide-field, high-multiplex spectroscopic survey facility under development for the VISTA telescope of ESO. 4MOST has a broad range of science goals ranging from Galactic Archaeology and stellar physics
Systematic Review Methodology for the Fatigue in Emergency Medical Services Project.
Patterson, P Daniel; Higgins, J Stephen; Weiss, Patricia M; Lang, Eddy; Martin-Gill, Christian
2018-02-15
Guidance for managing fatigue in the Emergency Medical Services (EMS) setting is limited. The Fatigue in EMS Project sought to complete multiple systematic reviews guided by seven explicit research questions, assemble the best available evidence, and rate the quality of that evidence for purposes of producing an Evidence Based Guideline (EBG) for fatigue risk management in EMS operations. We completed seven systematic reviews that involved searches of six databases for literature relevant to seven research questions. These questions were developed a priori by an expert panel and framed in the Population, Intervention, Comparison, and Outcome (PICO) format and pre-registered with PROSPERO. Our target population was defined as persons 18 years of age and older classified as EMS personnel or similar shift worker groups. A panel of experts selected outcomes for each PICO question as prescribed by the Grading of Recommendations, Assessment, Development, and Evaluation (GRADE) methodology. We pooled findings, stratified by study design (experimental vs. observational) and presented results of each systematic review in narrative and quantitative form. We used meta-analyses of select outcomes to generate pooled effects. We used the GRADE methodology and the GRADEpro software to designate a quality of evidence rating for each outcome. We present the results for each systematic review in accordance with the Preferred Reporting Items for Systematic reviews and Meta-Analyses (PRISMA). More than 38,000 records were screened across seven systematic reviews. The median, minimum, and maximum inter-rater agreements (Kappa) between screeners for our seven systematic reviews were 0.66, 0.49, and 0.88, respectively. The median, minimum, and maximum number of records retained for the seven systematic reviews was 13, 1, and 100, respectively. We present key findings in GRADE Evidence Profile Tables in separate publications for each systematic review. We describe a protocol for
DEFF Research Database (Denmark)
Hansen, Lars Kristian
2016-01-01
These years increasing interest is put on IT project portfolio management (IT PPM). Considering IT PPM an interdisciplinary practice, this paper conducts a concept-based literature review of relevant articles across various research disciplines. It finds and classifies a stock of 107 relevant...
Review projects for the US Fusion Program: Progress report, December 1, 1984-February 28, 1987
International Nuclear Information System (INIS)
Ribe, F.L.
1988-01-01
This paper reviews projects at the University of Washington on the following topics: Magnetic Fusion Energy Program Plan (Feb. 1985); High Density Power Systems; Fusion Systems Studies; Burning Plasmas and Compact Ignition Tokamak; US Magnetic Mirror Program; and Technical Planning Activity (Jan. 1987)
Solar Pilot Plant project review No. 9, May 4--5, 1977. CDRL item 10
Energy Technology Data Exchange (ETDEWEB)
None
1977-01-01
Drawings and illustrations for the project review are presented. These are included for the 10 MW(e) solar pilot plant, the collector subsystem, the receiver subsystem, the electrical power generation system and balance of plant, plant controls and transient analysis, availability and safety, pilot and commercial plant designs, and summary and recommendations. (MHR)
International Nuclear Information System (INIS)
1985-04-01
This six-volume compilation contains over 1000 reports prepared by the Advisory Committee on Reactor Safeguards from September 1957 through December 1984. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and within project name by chronological order. Part 2 categorizes the reports by the most appropriate generic subject area and within subject area by chronological order
DEFF Research Database (Denmark)
Pilkington, Alan; Chai, Kah-Hin; Le, Yang
2015-01-01
This paper identifies the true coverage of PM theory through a bibliometric analysis of the International Journal of Project Management from 1996-2012. We identify six persistent research themes: project time management, project risk management, programme management, large-scale project management......, project success/failure and practitioner development. These differ from those presented in review and editorial articles in the literature. In addition, topics missing from the PM BOK: knowledge management project-based organization and project portfolio management have become more popular topics...
Review, reaction, and projection: the role of the CFO in planning.
Nauert, R C
1985-08-01
In recent years, CFOs have become an integral part of the healthcare organization's strategic planning process. Although not the leader in the process, CFOs should assume a role of review, reaction, and projection. Furthermore, they should oppose any venture that would weaken the financial strength of the institution--whether or not they support the venture on social grounds. The CFO's responsibility in planning is to improve the financial strength of the organization, using support documentation, thorough preparation, and logic. The CEO's concern for community needs and desire to pursue a new business should be tempered by the CFO's financial and economic judgment.
Directory of Open Access Journals (Sweden)
Boris Michel
2009-01-01
Full Text Available Review of the monograph: Barr, Michael and Zlatko Skrbiš, Constructing Singapore. Elitism, Ethnicity and the Nation-Building Project, Copenhagen: NIAS Press, 2008, ISBN 978-87-7694-029-4, 304 pages
Parrott, Edith L.; Weiland, Karen J.
2017-01-01
This is the presentation for the AIAA Space conference in September 2017. It highlights key information from Using Model-Based Systems Engineering to Provide Artifacts for NASA Project Life-cycle and Technical Reviews paper.
DEFF Research Database (Denmark)
Demissew, Sebsebe; Brochmann, Christian; Kelbessa, Ensermu
2011-01-01
The account reviews and analyses the scietific projects derived from activities in connection with the Ethiopian Flora Project, including the [Ethiopian] Monocot Project, the Afro-alpine "Sky-island" project, the Vegetation and Ecological Conditions of Plantations Project, the Fire Ecology Projec...
Errors, lies and misunderstandings: Systematic review on behavioural decision making in projects
DEFF Research Database (Denmark)
Stingl, Verena; Geraldi, Joana
2017-01-01
limitations—errors), pluralist (on political behaviour—lies), and contextualist (on social and organizational sensemaking—misunderstandings). Our review suggests avenues for future research with a wider coverage of theories in cognitive and social psychology and critical and mindful integration of findings...... in projects and beyond. However, the literature is fragmented and draws only on a fraction of the recent, insightful, and relevant developments on behavioural decision making. This paper organizes current research in a conceptual framework rooted in three schools of thinking—reductionist (on cognitive...
Environmental-impact assessment of dams and reservoir projects (review and a case study)
International Nuclear Information System (INIS)
Shah, S.M.
2009-01-01
Dams and reservoirs are among one of the most sensitive of all development Project, in terms of pervasiveness of their influence in altering the environmental conditions and resources. In the present study, major dams and reservoir projects are reviewed, from the environmental point of view. Dams and Reservoir projects bring about major changes in the immediate environment, thus affecting public health, settlements, farmlands, roads and historical sites. Impacts on human population and wildlife may be profound. Tropical diseases, involving fresh-water hosts or vectors in their transmission, are often common around new reservoirs. Large lakes create limnological changes, excessive evaporation, seepage, disturbance in water-table and increased tendencies of landslides and earthquakes. Micro climatic changes are possible, such as fog formation, increased cloudiness and modified rainfall-patterns. Retention of sediment results in silting up of reservoirs. Water shortages on mountain rivers may leave unsightly dry river-beds below a dam. Sediment deposition and growth of vegetation in reservoir affects the water-extraction for navigation power-generation and fishing. Various dams and reservoir projects in the world are critically studied, in terms of creating environmental impacts. The Kala Bagh Dam project (Pakistan), which is ready for construction, has been analysed as a case study, by matrix method. Analyses show that adverse effects of this dam are less than the benefits. It is recommended that based on the experience, appropriate lines and strategies may be drawn up to evaluate the local projects. Multidisciplinary experts need to be involved, for assessing environmental impacts and suggesting mitigation measures, to combat the adverse effects. (author)
Project planning and project management of Baseball II-T
International Nuclear Information System (INIS)
Kozman, T.A.; Chargin, A.K.
1975-01-01
The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed
A Statistical Project Control Tool for Engineering Managers
Bauch, Garland T.
2001-01-01
This slide presentation reviews the use of a Statistical Project Control Tool (SPCT) for managing engineering projects. A literature review pointed to a definition of project success, (i.e., A project is successful when the cost, schedule, technical performance, and quality satisfy the customer.) The literature review also pointed to project success factors, and traditional project control tools, and performance measures that are detailed in the report. The essential problem is that with resources becoming more limited, and an increasing number or projects, project failure is increasing, there is a limitation of existing methods and systematic methods are required. The objective of the work is to provide a new statistical project control tool for project managers. Graphs using the SPCT method plotting results of 3 successful projects and 3 failed projects are reviewed, with success and failure being defined by the owner.
International Nuclear Information System (INIS)
1985-04-01
This six-volume compilation contains over 1000 reports prepared by the Advisory Committee on Reactor Safeguards from September 1957 through December 1984. The reports are divided into two groups: Part 1: ACRS Resports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and within project name by chronological order. Part 2 categorizes the reports by the most appropriate generic subject area and within subject area by chronological order. This volume includes reports arranged alpbabetically from Q to Z
Project Manager Performance and the Decision to Backsource the Project Management Office
Lively, William R.
2014-01-01
This paper reviews a management decision of an Information Technology Outsource (ITO) provider to backshore the management oversight of its Project Management Office (PMO) after only one year of offshore operations. Governance is a term used in project management to refer to management oversight. The review is a quantitative analysis of existing…
2012-09-19
... DEPARTMENT OF EDUCATION Notice of Submission for OMB Review; Institute of Education Sciences; FAFSA Completion Project Evaluation SUMMARY: The Institute of Education Sciences (IES) at the U.S. Department of Education (ED) is conducting a rigorous study of the Free Application for Federal Student Aid...
HHARP: The Historical Hospital Admission Records Project – a review
Directory of Open Access Journals (Sweden)
Cara Hirst
2018-04-01
Full Text Available Hospital records have frequently been used in epidemiological research (Kilgore et al. 2017; Rushton 2016, and in some cases palaeopathological research. However, the availability of data is problematic, with written records requiring considerable time to interpret, digitise and analyse. In 2001, the Historical Hospital Records Project (HHARP began digitising over 140,000 hospital admission records from four hospitals in London and Glasgow, providing researchers with an online data base of hospital records (Figure 1. I review the data available in the HHARP database, as well as make a preliminary analysis of the hospital records from London and Glasgow between c.1852-1921 which illustrates the value of the HHARP database in understanding disease and medical care during this period.
International Nuclear Information System (INIS)
1994-12-01
This document reports on the results of a peer review and evaluation of studies made of potential uses of assets from the terminated Superconducting Super Collider (SSC) project. These project definition studies focused on nine areas of use of major assets and facilities at the SSC site near Waxahachie, Texas. The studies were undertaken as part of the effort to maximize the value of the investment made in the SSC and were supported by two sets of grants, one to the Texas National Research Laboratory Commission (TNRLC) and the second to various universities and other institutions for studies of ideas raised by a public call for expressions of interest. The Settlement Agreement, recently signed by the Department of Energy (DOE) and TNRLC, provides for a division of SSC property. As part of the goal of maximizing the value of the SSC investment, the findings contained in this report are thus addressed to officials in both the Department and TNRLC. In addition, this review had several other goals: to provide constructive feedback to those doing the studies; to judge the benefits and feasibility (including funding prospects) of the projects studied; and to help worthy projects become reality by matching projects with possible funding sources
Energy Technology Data Exchange (ETDEWEB)
NONE
1994-12-01
This document reports on the results of a peer review and evaluation of studies made of potential uses of assets from the terminated Superconducting Super Collider (SSC) project. These project definition studies focused on nine areas of use of major assets and facilities at the SSC site near Waxahachie, Texas. The studies were undertaken as part of the effort to maximize the value of the investment made in the SSC and were supported by two sets of grants, one to the Texas National Research Laboratory Commission (TNRLC) and the second to various universities and other institutions for studies of ideas raised by a public call for expressions of interest. The Settlement Agreement, recently signed by the Department of Energy (DOE) and TNRLC, provides for a division of SSC property. As part of the goal of maximizing the value of the SSC investment, the findings contained in this report are thus addressed to officials in both the Department and TNRLC. In addition, this review had several other goals: to provide constructive feedback to those doing the studies; to judge the benefits and feasibility (including funding prospects) of the projects studied; and to help worthy projects become reality by matching projects with possible funding sources.
Peck, Myron A.; Arvanitidis, Christos; Butenschön, Momme; Canu, Donata Melaku; Chatzinikolaou, Eva; Cucco, Andrea; Domenici, Paolo; Fernandes, Jose A.; Gasche, Loic; Huebert, Klaus B.; Hufnagl, Marc; Jones, Miranda C.; Kempf, Alexander; Keyl, Friedemann; Maar, Marie; Mahévas, Stéphanie; Marchal, Paul; Nicolas, Delphine; Pinnegar, John K.; Rivot, Etienne; Rochette, Sébastien; Sell, Anne F.; Sinerchia, Matteo; Solidoro, Cosimo; Somerfield, Paul J.; Teal, Lorna R.; Travers-trolet, Morgan; De Wolfshaar, Van Karen E.
2018-01-01
We review and compare four broad categories of spatially-explicit modelling approaches currently used to understand and project changes in the distribution and productivity of living marine resources including: 1) statistical species distribution models, 2) physiology-based, biophysical models of
Review on the Projections of Future Storminess over the North Atlantic European Region
Directory of Open Access Journals (Sweden)
Tina Mölter
2016-04-01
Full Text Available This is an overview of the results from previously published climate modeling studies reporting on projected aspects of future storminess over the North Atlantic European region (NAER in the period 2020–2190. Changes in storminess are summarized for seven subregions in the study area and rated by a categorical evaluation scheme that takes into account emission scenarios and modeling complexity in the reviewed studies. Although many of the reviewed studies reported an increase in the intensity of high-impact wind speed and extreme cyclone frequency in the second half of the 21st century, the projections of aspects of future storminess over the NAER differed regionally. There is broad consensus that the frequency and intensity of storms, cyclones, and high-impact wind speed will increase over Central and Western Europe, and these changes will probably have the potential to produce more damage. In contrast, future extratropical storminess over Southern Europe is very likely to decrease. For Northern and Eastern Europe the results of the evaluation are inconclusive, because there is an indication of increasing as well as decreasing development of the evaluated aspects of future storminess. Concerning the storm track, we found indications of a likely north- and eastward shift in most assessed studies. Results from three studies suggest a northeastward shift of the North Atlantic Oscillation.
Map projections cartographic information systems
Grafarend, Erik W
2006-01-01
In the context of Geographical Information Systems (GIS) the book offers a timely review of map projections (sphere, ellipsoid, rotational surfaces) and geodetic datum transformations. For the needs of photogrammetry, computer vision, and remote sensing space projective mappings are reviewed.
Evaluation of rubber modified asphalt demonstration projects
Energy Technology Data Exchange (ETDEWEB)
1994-01-01
As part of the Ontario Government's medium-term scrap tire management strategy, 11 rubber modified asphalt demonstration projects were funded or completed, with 13 additional projects from small to large (1,500-65,000 passenger tire equivalents) approved for the 1993 paving season. This report presents the results of an August to November 1993 study of the 11 demonstration projects. The evaluation included a description of the technology; technical review of the projects; economic analysis; review of the environmental literature; environmental review of the projects; comparison of the projects with similar ones in other jurisdictions; and recommendations. Detailed information on asphalt technology is included in an appendix.
Pedrini, D. T.; Pedrini, Bonnie C.
Sigmund Freud and his associates did much clinical work with the dynamic of projection, especially with regard to paranoid symptoms and syndromes. Much experimental work has also been done with projection. Sears evaluated the results of some of those studies. Murstein and Pryer sub-classified projection and reviewed typical studies. The…
Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting
Energy Technology Data Exchange (ETDEWEB)
Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.
1995-02-01
The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations.
Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting
International Nuclear Information System (INIS)
Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.
1995-02-01
The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations
International Nuclear Information System (INIS)
Kaback, Dawn S.; Chamberlain, Grover; Morse, John G.; Petersen, Scott W.
2012-01-01
The US Department of Energy Office of Environmental Management has supported independent technical reviews of soil and groundwater projects at multiple DOE sites over the last 10 years. These reviews have resulted in significant design improvements to remedial plans that have accelerated cleanup and site closure. Many have also resulted in improved understanding of complex subsurface conditions, promoting better approaches to design and implementation of new technologies. Independent technical reviews add value, because they provide another perspective to problem solving and act as a check for especially challenging problems. By bringing in a team of independent experts with a broad experience base, alternative solutions are recommended for consideration and evaluation. In addition, the independence of the panel is significant, because it is able to address politically sensitive issues. The expert panel members typically bring lessons learned from other sites to help solve the DOE problems. In addition, their recommendations at a particular site can often be applied at other sites, making the review even more valuable. The review process can vary, but some common lessons ensure a successful review: - Use a multi-disciplinary broadly experienced team; - Engage the panel early and throughout the project; - Involve regulators and stakeholders in the workshop, if appropriate. - Provide sufficient background information; - Close the workshop with a debriefing followed by a written report. Many groundwater remediation challenges remain at DOE sites. Independent technical reviews have and will ensure that the best capabilities and experience are applied to reduce risks and uncertainties. Even though the groundwater remediation industry has developed significantly over the last twenty years, advancements are needed to address the complexities of the subsurface at the DOE sites. These advancements have tremendous potential to save millions of dollars and to accelerate the
International Nuclear Information System (INIS)
Mattsson, H.; Tishakov, P.
2010-11-01
In this report, Norwegian Radiation Protection Authority (NRPA) has reviewed the Norwegian funded projects on nuclear safety performed in the period 2005-2009 under the Norwegian Action Plan. NRPA has evaluated the progress of eight projects implemented by the Institute for Energy Technology (IFE) at Kola Nuclear Power Plant (KNPP) and Leningrad Nuclear Power Plant (LNPP). NRPA has visited the plants, inspected delivered equipment and discussed the projects implementation with relevant personnel at the plants. One of NRPA findings is that the equipment has been delivered to KNPP and LNPP, it is in regular use by competent personnel, and the equipment contributes to safety of both plants. Furthermore, the cooperation between three main project partners - IFE, LNPP and KNPP, seems to be very productive. NRPA's main conclusion is therefore that the projects have been implemented as described in IFE's project reports and that the goals are met. Furthermore, this report reviews safety levels at the KNPP and LNPP. Safety parameters at the plants indicate that the safety level has been significantly improved since early 1990s when the cooperation between Norway and Russia was initiated. Probabilistic safety assessment (PSA) values and number of INES (International Nuclear Event Scale) events, two internationally acknowledged safety parameters, indicate that the safety level has been much improved since the early 1990s when the cooperation between Norway and Russia started. Although it is clear that the Norwegian-funded projects have contributed positively to this development it is difficult to quantify the contribution. Moreover, the report also reviews the planned life-time of and the decommissioning plans for the reactors at KNPP and LNPP. Construction of new LNPP reactors has started and it is estimated that they will be operational in 2013- 2015. The license of the oldest reactor at LNPP expires in 2018 and if the new reactors are in operation by that time, it is
Aranda-Jan, Clara B; Mohutsiwa-Dibe, Neo; Loukanova, Svetla
2014-02-21
Access to mobile phone technology has rapidly expanded in developing countries. In Africa, mHealth is a relatively new concept and questions arise regarding reliability of the technology used for health outcomes. This review documents strengths, weaknesses, opportunities, and threats (SWOT) of mHealth projects in Africa. A systematic review of peer-reviewed literature on mHealth projects in Africa, between 2003 and 2013, was carried out using PubMed and OvidSP. Data was synthesized using a SWOT analysis methodology. Results were grouped to assess specific aspects of project implementation in terms of sustainability and mid/long-term results, integration to the health system, management process, scale-up and replication, and legal issues, regulations and standards. Forty-four studies on mHealth projects in Africa were included and classified as: "patient follow-up and medication adherence" (n = 19), "staff training, support and motivation" (n = 2), "staff evaluation, monitoring and guidelines compliance" (n = 4), "drug supply-chain and stock management" (n = 2), "patient education and awareness" (n = 1), "disease surveillance and intervention monitoring" (n = 4), "data collection/transfer and reporting" (n = 10) and "overview of mHealth projects" (n = 2). In general, mHealth projects demonstrate positive health-related outcomes and their success is based on the accessibility, acceptance and low-cost of the technology, effective adaptation to local contexts, strong stakeholder collaboration, and government involvement. Threats such as dependency on funding, unclear healthcare system responsibilities, unreliable infrastructure and lack of evidence on cost-effectiveness challenge their implementation. mHealth projects can potentially be scaled-up to help tackle problems faced by healthcare systems like poor management of drug stocks, weak surveillance and reporting systems or lack of resources. mHealth in Africa is an innovative approach
Williamson, Nicholas C.
2001-01-01
Describes Export Odyssey (EO), a structured, Internet-intensive, team-based undergraduate student project in international marketing. Presents an analytical review of articles in the literature that relate to three key teaching-learning dimensions of student projects (experiential versus non-experiential active learning, team-based versus…
Gray, Dennis; Wilson, Mandy; Allsop, Steve; Saggers, Sherry; Wilkes, Edward; Ober, Coralie
2014-09-01
To review the results of five research projects commissioned to enhance alcohol treatment among Aboriginal Australians, and to highlight arising from them. Drafts of the papers were workshopped by project representatives, final papers reviewed and results summarised. Lessons arising were identified and described. While the impact of the projects varied, they highlight the feasibility of adapting mainstream interventions in Aboriginal Australian contexts. Outcomes include greater potential to: screen for those at risk; increase community awareness; build capacity and partnerships between organisations; and co-ordinate comprehensive referral networks and service provision. Results show a small investment can produce sustainable change and positive outcomes. However, to optimise and maintain investment, cultural difference needs to be recognised in both planning and delivery of alcohol interventions; resources and funding must be responsive to and realistic about the capacities of organisations; partnerships need to be formed voluntarily based on respect, equality and trust; and practices and procedures within organisations need to be formalised. There is no simple way to reduce alcohol-related harm in Aboriginal communities. However, the papers reviewed show that with Aboriginal control, modest investment and respectful collaboration, service enhancements and improved outcomes can be achieved. Mainstream interventions need to be adapted to Aboriginal settings, not simply transferred. The lessons outlined provide important reflections for future research. © 2014 Australasian Professional Society on Alcohol and other Drugs.
International Nuclear Information System (INIS)
1983-01-01
On a country by country basis the International Uranium Resources Evaluation Project (IUREP) estimates 1982-1983 are reviewed. Information provided includes exploration work, airborne survey, radiometric survey, gamma-ray spectrometric survey, estimate of speculative resources, uranium occurrences, uranium deposits, uranium mineralization, agreements for uranium exploration, feasibilities studies, geological classification of resources, proposed revised resource range, production estimate of uranium
Raju, Ivatury S.; Larsen, Curtis E.; Pellicciotti, Joseph W.
2010-01-01
Glenn Research Center Chief Engineer's Office requested an independent review of the structural analysis and modeling of the Communications, Navigation, and Networking re-Configurable Testbed (CoNNeCT) Project Antenna Pointing Subsystem (APS) Integrated Gimbal Assembly (IGA) to be conducted by the NASA Engineering and Safety Center (NESC). At this time, the IGA had completed its critical design review (CDR). The assessment was to be a peer review of the NEi-NASTRAN1 model of the APS Antenna, and not a peer review of the design and the analysis that had been completed by the GRC team for CDR. Thus, only a limited amount of information was provided on the structural analysis. However, the NESC team had difficulty separating analysis concerns from modeling issues. The team studied the NASTRAN model, but did not fully investigate how the model was used by the CoNNeCT Project and how the Project was interpreting the results. The team's findings, observations, and NESC recommendations are contained in this report.
Identification of suicidal ideations with the help of projective tests: a review.
Kumar, Devvarta; Nizamie, S Haque; Abhishek, Priyadarshee; Prasanna, Lavanya Tumkur
2014-12-01
Identification of the presence of suicidal ideations in an individual is crucial for the timely intervention. However, these ideations may remain unidentified as an individual with serious intentions of self-harm may not express them explicitly. Various projective tests can provide crucial clues to clinicians about the presence of suicidal ideations in an individual's mind. The present review is intended to update clinicians working in the field of suicide prevention about salient findings on these tests which can serve as a ready reckoner for them. We also highlight the status of research in this domain. Copyright © 2014 Elsevier B.V. All rights reserved.
2014-01-01
Background Access to mobile phone technology has rapidly expanded in developing countries. In Africa, mHealth is a relatively new concept and questions arise regarding reliability of the technology used for health outcomes. This review documents strengths, weaknesses, opportunities, and threats (SWOT) of mHealth projects in Africa. Methods A systematic review of peer-reviewed literature on mHealth projects in Africa, between 2003 and 2013, was carried out using PubMed and OvidSP. Data was synthesized using a SWOT analysis methodology. Results were grouped to assess specific aspects of project implementation in terms of sustainability and mid/long-term results, integration to the health system, management process, scale-up and replication, and legal issues, regulations and standards. Results Forty-four studies on mHealth projects in Africa were included and classified as: “patient follow-up and medication adherence” (n = 19), “staff training, support and motivation” (n = 2), “staff evaluation, monitoring and guidelines compliance” (n = 4), “drug supply-chain and stock management” (n = 2), “patient education and awareness” (n = 1), “disease surveillance and intervention monitoring” (n = 4), “data collection/transfer and reporting” (n = 10) and “overview of mHealth projects” (n = 2). In general, mHealth projects demonstrate positive health-related outcomes and their success is based on the accessibility, acceptance and low-cost of the technology, effective adaptation to local contexts, strong stakeholder collaboration, and government involvement. Threats such as dependency on funding, unclear healthcare system responsibilities, unreliable infrastructure and lack of evidence on cost-effectiveness challenge their implementation. mHealth projects can potentially be scaled-up to help tackle problems faced by healthcare systems like poor management of drug stocks, weak surveillance and reporting systems or
Fuel transfer system ALARA design review - Project A.15
International Nuclear Information System (INIS)
KUEBERTH, L.R.
2001-01-01
One mission of the Spent Nuclear Fuel (SNF) Project is to move the SNF from the K Basins in the Hanford 100K Area to an interim dry storage at the Canister Storage Building (CSB) in the Hanford 200 East Area. The Fuel Transfer System (FTS) is a subproject that will move the SNF from the 105K East (KE) Facility to the 105K West (KW) Facility. The SNF will be treated for shipment to the Cold Vacuum Drying (CVD) facility at the KW Basin. The SNF canisters will be loaded underwater into a Shielded Transfer Cask (STC) in the KE Basin. The fully loaded STC will be brought out of the water and placed into a Cask Transfer Overpack (CTO) by the STC Straddle Carrier. As the STC is removed from the water, it will be washed down with demineralized water by an manual rinse system. The CTO with the STC inside will be placed on a transport trailer and transferred to the KW Basin as an intra-facility transfer. The CTO will be unloaded from the shipping trailer at the KW Basin and the STC will be removed from the CTO. The STC will then be lowered into the KW Basin water and the fuel will be removed. The SNF will then be processed for shipment to the CVD. As soon as all of the fuel has been removed from the STC, the cask will be removed from the KW Basin water and placed into the CTO. The CTO will again be placed on the trailer for transport back to the KE Basin where the entire cycle will be repeated approximately 400 times. This document records the As Low As Reasonably Achievable (ALARA) findings and design recommendations/requirements by the SNF Project noted during the Final Design Review of the STC, CTO, STC Transfer System, Annexes and Roadways for support of FTS. This document is structured so that all statements that include the word ''shall'' represent design features that have been or will be implemented within the project scope. Statements that include the words ''should'' or ''recommend'' represent ALARA design features to be evaluated for future implementation
International Nuclear Information System (INIS)
Wheeler, T.A.; Lambright, J.A.; Sype, T.T.; Darby, J.L.; Walsh, B.
1991-08-01
The objective of this review is to evaluate the South Texas Project (STP) Probabilistic Safety Analysis (PSA) for the USNRC. The PSA was reviewed for thoroughness of analysis, accuracy in plant modeling, legitimacy of assumptions, and overall quality of the work. The review is limited to the internal event analysis and the fire sequence analysis. This review is not a quantitative evaluation of the adequacy of the PSA. The adequacy of the PSA depends on the intended uses and must be addressed on a case-by-case basis by the licensee and the NRC. This review identifies strengths, weakness, and areas where additional clarification would assist the NRC in evaluating the PSA for specific regulatory purposes. The licensee, Houston Lighting and Power (HL ampersand P), reviewed a draft version of this report prior to its final release to the USNRC. The responses provided by HL ampersand P are provided in detail in appendices to this report, and they are summarized in the main body of the report. All issues raised during the review were adequately addressed by HL ampersand P in the responses. 27 refs., 4 tabs
Energy Technology Data Exchange (ETDEWEB)
Walters, W.H.; Dirkes, R.L.; Napier, B.A.
1992-11-01
As part of the Hanford Environmental Dose Reconstruction (HEDR) Project, Battelle, Pacific Northwest Laboratories reviewed literature and data on radionuclide concentrations and distribution in the water, sediment, and biota of the Columbia River and adjacent coastal areas. Over 600 documents were reviewed including Hanford reports, reports by offsite agencies, journal articles, and graduate theses. Radionuclide concentration data were used in preliminary estimates of individual dose for the period 1964 through 1966. This report summarizes the literature and database reviews and the results of the preliminary dose estimates.
International Nuclear Information System (INIS)
SHOOP, D.S.
1999-01-01
The purpose of this review is to verify the implementation status of the Integrated Safety Management System (ISMS) for the River Protection Project (RPP) facilities managed by Fluor Daniel Hanford, Inc. (FDH) and operated by Lockheed Martin Hanford Company (LMHC). This review will also ascertain whether within RPP facilities and operations the work planning and execution processes are in place and functioning to effectively protect the health and safety of the workers, public, environment, and federal property over the RPP life cycle. The RPP ISMS should support the Hanford Strategic Plan (DOERL-96-92) to safely clean up and manage the site's legacy waste and deploy science and technology while incorporating the ISMS central theme to ''Do work safely'' and protect human health and the environment
2011-09-16
...-015] Boundary Hydroelectric Project; Sullivan Creek Project; Notice of Availability of the Final Environmental Impact Statement for the Relicensing of the Boundary Hydroelectric Project and the Surrender of... reviewed the applications for license for the Boundary Hydroelectric Project (FERC No. 2144-38), and the...
Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives
Sanabria, Orlando
Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.
International Nuclear Information System (INIS)
1994-07-01
This report is a response to the findings and recommendations contained in the ITR report. The text of this document summarizes each ITR finding and recommendation, presents the TAC response, and concludes that implementation of many of the recommendations would benefit the UMTRA Project. Implementation of the recommendations represents ongoing improvement to the TAC well installation and development procedures and will result, in lower overall project costs. Appendix B is an implementation plan that groups similar or complementary action items, provides a schedule for implementation, identifies the group or people responsible for the changes, and estimates hours to implement the changes. The four major action items are as follows: (1) ITR Reevaluation, (2) Well Installation SOP Review and Revision, (3) Well Installation Contract Review and Revision, and (4) TAC and DOE Communications Improvement. The hours listed to implement the improvements are intended to be estimates for budgeting and planning purposes for the remainder of this fiscal year and the upcoming fiscal year
Energy Technology Data Exchange (ETDEWEB)
1994-07-01
This report is a response to the findings and recommendations contained in the ITR report. The text of this document summarizes each ITR finding and recommendation, presents the TAC response, and concludes that implementation of many of the recommendations would benefit the UMTRA Project. Implementation of the recommendations represents ongoing improvement to the TAC well installation and development procedures and will result, in lower overall project costs. Appendix B is an implementation plan that groups similar or complementary action items, provides a schedule for implementation, identifies the group or people responsible for the changes, and estimates hours to implement the changes. The four major action items are as follows: (1) ITR Reevaluation, (2) Well Installation SOP Review and Revision, (3) Well Installation Contract Review and Revision, and (4) TAC and DOE Communications Improvement. The hours listed to implement the improvements are intended to be estimates for budgeting and planning purposes for the remainder of this fiscal year and the upcoming fiscal year.
Pingston hydroelectric project - stage 2 project report : volume 1 of 2
International Nuclear Information System (INIS)
1999-01-01
The British Columbia Environmental Assessment Office has reviewed an application by Canadian Hydro Developers (B.C.) Inc., to develop the Pingston Hydroelectric Project, a run-of-river facility, located 60 km south of Revelstoke, British Columbia. The review includes an evaluation of any social and environmental impacts, including the effects on migratory birds, small mammals, amphibians, fish, wildlife, water quality, noise and visual aspects, that would be associated with the project. One consideration in selecting the project site was its ease of access along existing roadways and close proximity to power lines, another, the absence of any potential effects on fish and fish habitat. The project is also expected to have a negligible effect on water quality- related matters such as sediment transport, nutrient trapping in the headpond, and movement of large organic debris through the system. The project will not impact on archaeological resources, offers a renewable supply of energy and represents an overall positive effect on air quality for British Columbia. BC Hydro has committed to providing electrical interconnection to the main grid. 9 refs., 5 tabs., 14 figs., 9 appendices
Review of geography internship of convective wave project
Rademacher, Kurt R.; Collins, Charles
1990-01-01
The internship of the author is examined in detail. The acquisition of the internship, the personnel of the project, the project itself, and the goals associated with it are described. The authors orientation to the internship, the project's operations, and the conclusion of the findings are also described. The overall goal of the project was to determine the effect of convective waves on wind speeds in the middle and upper troposphere, and how these waves affect the general circulation on a global scale. A more specific goal of the author was the satellite analysis of cloud street formations. This was done to determine frequency and areas in which cloud streets occur off the East Asian and North American coastlines.
2017 Project Peer Review Report
Energy Technology Data Exchange (ETDEWEB)
None, None
2018-02-06
This document summarizes the recommendations and evaluations provided by an independent external panel of experts at the 2017 U.S. Department of Energy Bioenergy Technologies Office's Peer Review meeting.
Managemant of NASA's major projects
James, L. B.
1973-01-01
Approaches used to manage major projects are studied and the existing documents on NASA management are reviewed. The work consists of: (1) the project manager's role, (2) request for proposal, (3) project plan, (4) management information system, (5) project organizational thinking, (6) management disciplines, (7) important decisions, and (8) low cost approach.
2010-10-01
... SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the...-Governance Tribe? (a) The Secretary shall review and approve planning documents to ensure compliance with... design documents for general compliance with requirements of the construction project agreement. (b) The...
Project management: importance for diagnostic laboratories.
Croxatto, A; Greub, G
2017-07-01
The need for diagnostic laboratories to improve both quality and productivity alongside personnel shortages incite laboratory managers to constantly optimize laboratory workflows, organization, and technology. These continuous modifications of the laboratories should be conducted using efficient project and change management approaches to maximize the opportunities for successful completion of the project. This review aims at presenting a general overview of project management with an emphasis on selected critical aspects. Conventional project management tools and models, such as HERMES, described in the literature, associated personal experience, and educational courses on management have been used to illustrate this review. This review presents general guidelines of project management and highlights their importance for microbiology diagnostic laboratories. As an example, some critical aspects of project management will be illustrated with a project of automation, as experienced at the laboratories of bacteriology and hygiene of the University Hospital of Lausanne. It is important to define clearly beforehand the objective of a project, its perimeter, its costs, and its time frame including precise duration estimates of each step. Then, a project management plan including explanations and descriptions on how to manage, execute, and control the project is necessary to continuously monitor the progression of a project to achieve its defined goals. Moreover, a thorough risk analysis with contingency and mitigation measures should be performed at each phase of a project to minimize the impact of project failures. The increasing complexities of modern laboratories mean clinical microbiologists must use several management tools including project and change management to improve the outcome of major projects and activities. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All rights reserved.
Hopkins, Robert Borden; Campbell, Kaitryn; O'Reilly, Daria; Tarride, Jean-Eric; Bowen, Jim; Blackhouse, Gord; Goerre, Ron
2007-05-16
To summarize and then assess with a pilot study the use of published best practice recommendations for priority setting during management of multiple healthcare research projects, in a resource-constrained environment. Medical, economic, business, and operations literature was reviewed to summarize and develop a survey to assess best practices for managing multiple projects. Fifteen senior healthcare research project managers, directors, and faculty at an urban academic institution were surveyed to determine most commonly used priority rules, ranking of rules, characteristics of their projects, and availability of resources. Survey results were compared to literature recommendations to determine use of best practices. Seven priority-setting rules were identified for managing multiple projects. Recommendations on assigning priorities by project characteristics are presented. In the pilot study, a large majority of survey respondents follow best practice recommendations identified in the research literature. However, priority rules such as Most Total Successors (MTS) and Resource Scheduling Method (RSM) were used "very often" by half of the respondents when better performing priority rules were available. Through experience, project managers learn to manage multiple projects under resource constraints. Best practice literature can assist project managers in priority setting by recommending the most appropriate priority given resource constraints and project characteristics. There is room for improvement in managing multiple projects.
2013-01-14
... DEPARTMENT OF THE INTERIOR Office of the Secretary Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental Assessment AGENCY: Office of the Assistant Secretary... assessment for the East Hobble Creek Restoration Project is available for public review and comment. The...
Using Vector Projection Method to evaluate maintainability of mechanical system in design review
International Nuclear Information System (INIS)
Chen Lu; Cai Jianguo
2003-01-01
Maintainability of a mechanical system is one of the system design parameters that has a great impact in terms of ease of maintenance. In this article, based on the definition of the terms of maintenance and maintainability, an important tool of Design for Maintenance is developed as a way to improve maintainability through design. A set of standard and organized guidelines is provided and maintainability factors in terms of physical design, logistics support and ergonomics are identified. As a specific application of design review, a methodology so called Vector Projection Method is developed to evaluate the maintainability of the mechanical system. Lastly, an example is discussed
Review of the project risk management plan in the capital projects organization at ConocoPhillips
Meidell, Camilla
2011-01-01
Master's thesis in Risk management Project Risk Management (PRM) has in recent years become an important aspect of business organization and project management. There has always been a requirement for some risk management at COPNO. However about 3 years ago the process became much more defined and has become a requirement for the contingency used on projects to be based upon the risking process. Since risk management in projects is a requirement in the CP organization it is ...
Environmental standards and project construction: A review
International Nuclear Information System (INIS)
Mason, P.F.; Thornberry, H.L.
1991-01-01
In the past decade, changes have occurred in the area of environmental regulation. This paper identifies the typical environmental standards applicable to project construction, recent environmental regulatory issues and trends, and identifies new environmental issues which must be considered in project construction. These include (1) handling hazardous chemicals in the workplace, (2) construction at formerly utilized sites, (3) disposal of debris, construction materials and hazardous waste, and (4) training and experience of construction personnel in environmental issues
2013-03-26
...: There is no existing Governmentwide data base that collects PLAs and specifically the number submitted... Project Labor Agreements for Federal Construction Projects AGENCY: Department of Defense (DOD), General... information collection requirement regarding Use of Project Labor Agreements for Federal Construction Projects...
A review of the design, construction and development of the PUSPATI project
International Nuclear Information System (INIS)
Ahmad Tajuddin Ali.
1983-01-01
The setting up of the Tun Ismail Atomic Research Centre (PUSPATI) was decided upon in September 1972 and soon after, plans were underway for the purchase of a research reactor and the construction of a research centre to house it. The centre was originally planned to be located at Sungai Buloh about 20 km to the north-west of Kuala Lumpur. However, in September 1978, a decision was made to locate the centre at Bangi, about 32 km to south of Kuala Lumpur. Earth work was started in January 1979 with clearing of the forest at the proposed site. Building construction started in February 1980. By September 1981, the reactor building was practically completed and enable reactor construction to begin. This was finished on July 15, 1982 when the reactor was officially handed over to PUSPATI. Work on the rest of the complex fell behind schedule and was only completed in July 1983 when PUSPATI moved in to occupy the research laboratories. The implementation of the PUSPATI project has been completed not without its share of problems. Its completion also marks the beginning of a new era for the development of nuclear science and technology in this country. This paper reviews the design, construction and development of the entire project. (author)
Map projections cartographic information systems
Grafarend, Erik W; Syffus, Rainer
2014-01-01
This book offers a timely review of map projections including sphere, ellipsoid, rotational surfaces, and geodetic datum transformations. Coverage includes computer vision, and remote sensing space projective mappings in photogrammetry.
Annual review of research projects 1980
International Nuclear Information System (INIS)
Keam, D.W.
1981-11-01
The Australian Radiation Laboratory is a national centre concerned with the public and occupational health aspects of the use of both ionising and non-ionising radiation. Thirty two projects which were in progress during 1980 are described
International Nuclear Information System (INIS)
Garcia, Susan E.; Odell, Andrew D.; Giannelli, Joseph F.
2012-09-01
Intergranular Stress Corrosion Cracking (IGSCC) and its impacts have been a major concern to the BWR fleet since the mid-70's. Several alternative strategies have been employed to reduce the negative impacts, however, the newest being Early Hydrogen Water Chemistry (EHWC). The Electric Power Research Institute (EPRI) and the BWRVIP (Vessel Internals Project) has strongly supported the development of EHWC, including laboratory testing and a demonstration program that was performed at Peach Bottom Atomic Power Station in October 2011. This paper will review the impacts of a 'Special Test Program' on a BWR plant including: Project management findings; technical reviews and documents required to support such a demonstration program; temporary equipment design, installation and testing; keeping the demonstration progressing along with the plant return from a refuel outage; and lessons learned that can be applied to EHWC implementation during future start-ups. Details will be compared between various Exelon BWRs in support of conceptual designs for EHWC systems and operation. Some comparisons on operational impacts will be provided between various types of BWR plants with differing 'Balance of Plant' designs. (authors)
Assessment of Smolt Condition for Travel Time Analysis Project, 1987-1997 Project Review.
Energy Technology Data Exchange (ETDEWEB)
Schrock, Robin M.; Hans, Karen M.; Beeman, John W. [US Geological Survey, Western Fisheries Research Center, Columbia River Research Laboratory, Cook, WA
1997-12-01
The assessment of Smolt Condition for Travel Time Analysis Project (Bonneville Power Administration Project 87-401) monitored attributes of salmonid smolt physiology in the Columbia and Snake River basins from 1987 to 1997, under the Northwest Power Planning Council Fish and Wildlife Program, in cooperation with the Smolt Monitoring Program of the Fish Passage Center. The primary goal of the project was to investigate the physiological development of juvenile salmonids related to migration rates. The assumption was made that the level of smolt development, interacting with environmental factos such as flow, would be reflected in travel times. The Fish Passage Center applied the physiological measurements of smolt condition to Water Budget management, to regulate flows so as to decrease travel time and increase survival.
Hosford, Bryan
2017-01-01
Organizations continue to rely on information technology (IT) as a foundational element, yet poor IT project success continues to impact growth and innovation. Research into IT project success is widespread yet has focused on high-level project management attributes, not specific IT solutions. A review of the research literature revealed that the…
The SKI SITE-94 Project: An International Peer Review Carried out by an OECD/NEA Team of Experts
International Nuclear Information System (INIS)
Sagar, Budhi; Devillers, C.; Smith, Paul; Laliuex, P.; Pescatore, C.
1997-10-01
The recently completed SITE-94 project is an SKI effort directed at building competence and capacity in the assessment of safety of a spent-fuel geologic repository. Emphasis is given to the assimilation of site-specific data, with its associated uncertainties, into the performance assessment. Specific attention is also given to improving the understanding of mechanisms that might compromise canister integrity. This report represents the common views of an International Review Team (IRT) established by the NEA Secretariat, at the request of SKI, to perform a peer review of SITE-94. The basis for the report is the understanding of SITE-94 and its background obtained by IRT in the course of several months of study of SITE-94 documentation, internal discussions and a meeting with SKI in Stockholm. The report is limited to the main findings of IRT. The intended audience of the report is the staff of SKI and, accordingly, the style of the report is suited to a technical audience familiar with the contents of the SITE-94 project
International Nuclear Information System (INIS)
1986-01-01
Two documents related to the Crystalline Repository Project have been reviewed. Comments and concerns related to the review of the ''Region-To-Area Screening Methodology'' and the ''Draft Area Recommendation Report'' are presented. These comments will be considered in preparation of the Final Area Recommendation Report, which will serve to formally identify potentially acceptable sites for a second repository in crystalline rock. Following a detailed review of the aforementioned documents, it is concluded that the identification of proposed potentially acceptable sites in the Draft Area Recommendation Report is based on questionable screening methodology and often incomplete data. As a result, ''favorable characteristics'' that are ascribed to each of the proposed potentially acceptable sites are, in many cases, misleading
Energy Technology Data Exchange (ETDEWEB)
Liu, Xu [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Marnay, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Feng, Wei [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Zhou, Nan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Karali, Nihan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)
2017-06-21
The Chinese government has paid growing attention to renewable energy development and has set ambitious goals for carbon dioxide (CO2) emissions reduction and energy savings. Smart grid (SG) technologies have been regarded as emerging ways to integrate renewable energy and to help achieve these climate and energy goals. This report first reviews completed SG demonstrations under the U.S. American Recovery and Reinvestment Act (ARRA); especially two key programs: the SG Investment Grant (SGIG) and the SG Demonstration Project (SGDP). Under the SGIG, the larger of the two programs, over $3.4 billion was used to help industry deploy existing advanced SG technologies and tools to improve grid performance and reduce costs. Including industry investment, a total of $8 billion was spent on 99 cost-shared projects, which involved more than 200 participating electric utilities and other organizations. These projects aimed to modernize the electric grid, strengthen cyber security, improve interoperability, and collect comprehensive data on SG operations and benefits.
Heitmuller, Franklin T.; Asquith, William H.; Fang, Xing; Thompson, David B.; Wang, Keh-Han
2005-01-01
A review of the literature addressing sediment transport in gravel-bed river systems and structures designed to control bed-load mobility is provided as part of Texas Department of Transportation research project 0–4695: Guidance for Design in Areas of Extreme Bed-Load Mobility. The study area comprises the western half of the Edwards Plateau in central Texas. Three primary foci of the literature review are journal articles, edited volumes, and government publications. Major themes within the body of literature include deterministic sediment transport theory and equations, development of methods to measure and analyze fluvial sediment, applications and development of theory in natural channels and flume experiments, and recommendations for river management and structural design. The literature review provides an outline and foundation for the research project to characterize extreme bed-load mobility in rivers and streams across the study area. The literature review also provides a basis upon which potential modifications to low-water stream-crossing design in the study area can be made.
Izaguirre, Ada Karina; Hunt, Catherine
2005-01-01
Drawing on the World Bank's Private Participation in Infrastructure Project Database, this Note reviews developments in the water and sewerage sector of developing countries in 2004 and changes in private participation in the sector since 2001. Data for 2004 show that total investment in water and sewerage projects with private participation amounted to nearly US$2 billion. Recent private ...
Massachusetts Crystalline Repository Project. Progress report, December 31, 1985
International Nuclear Information System (INIS)
1985-01-01
Project activities which have been undertaken include the following: review and comment on OCRD projects reports; review of pertinent DOE, NRC, EPA, and DOT quidelines and regulations; review of reports and maps released by the federal project group and contractors; attendance at DOE workshops and conferences; implementation of state-specific research activities; interaction with representatives of federal agencies and other participating states; and interface with media, state officials and legislators, and interested citizens
Bruckner, M. Z.; Birnbaum, S. J.; Bralower, T. J.; Egger, A. E.; Fox, S.; Gosselin, D. C.; Iverson, E. A. R.; Manduca, C. A.; Mcconnell, D. A.; Steer, D. N.; Taber, J. J.
2016-12-01
InTeGrate is dedicated to providing robust curricular materials that increase Earth literacy among undergraduate students. As of August 2016, 14 modules that use an interdisciplinary approach to teach about Earth-related sustainability issues across the curriculum have been published, and 19 courses and modules are undergoing final revisions. Materials are designed for undergraduate courses and have been tested in a variety of disciplines including geoscience, engineering, humanities, ethics, and Spanish language courses. The materials were developed, tested, revised, and reviewed using a two-year, highly scaffolded process that involves meeting a series of checkpoints, and is supported by a team of experts who provide guidance and formative feedback throughout the process. A series of webinars also supported teams in the development process. Author teams comprise 3-6 faculty members from at least three different institutions. Authors work collaboratively in a templated webspace designed specifically for creating materials, and representatives from the InTeGrate leadership, assessment, and web teams support each group of authors. This support team provides guidance and feedback on content, pedagogy, and web layout as authors develop materials. Authors attend two face-to-face meetings, one at the beginning of the process and another after materials are piloted in authors' classes. These meetings serve to initially orient authors to the development process, including the rubric that will guide their work, and in making revisions following the piloting phase of the project. Authors report that the meetings also provide professional development experience wherein they learn about pedagogy from each other and team leaders. The bulk of the materials development occurs remotely, with teams meeting regularly via teleconference as they follow the project timeline. All materials undergo review against the Materials Design and Refinement Rubric to ensure they meet project
NASA Standing Review Board Handbook: Revision B
Amer, Tahani R.; Ortiz, James N.; Calloway, Michelle A.; Greathouse, Richard M.; Polen, Charles A.; Baker, Ronald L.; Borchardt, Heidemarie E.; Chromik, Christopher C.; Moran, Erin; Paraska, Michael W.;
2016-01-01
This SRB Handbook provides review guidance for the program and project communities and for the SRBs regarding the expectations, processes, products, timelines, and working interfaces with review organizations, Centers, Mission Directorates, Mission Support Organizations, and Management Councils. It provides guidelines for membership selection, review implementation, review products, and reporting of results. The SRB Handbook guidance may be tailored, with the Convening Authorities' approval, to meet the needs of the Agency, Mission Directorates, Centers, and the programs and projects being reviewed. The final review agreement of the SRB, program and project, and Convening Authorities for program and project Life-Cycle Reviews (LCRs) is documented in the terms of reference, as described in Section 4.1 and Appendix H.
Energy Technology Data Exchange (ETDEWEB)
Tocheniy, L. V.; Rudneva, V. Ya. [ISTC, Moscow (Russian Federation)
1998-07-01
The ISTC is an intergovernmental organization established by agreement between the Russian Federation, the European Union, Japan, and the United States. Since 1994, Finland, Sweden, Norway, Georgia, Belarus, Kazakhstan and the Kyrgyz Republic have acceded to the Agreement and Statute. At present, the Republic of Korea is finishing the process of accession to the ISTC. All work of the ISTC is aimed at the goals defined in the ISTC Agreement: To give CIS weapons scientists, particularly those who possess knowledge and skills related to weapons of mass destruction and their delivery systems, the opportunities to redirect their talents to peaceful activities; To contribute to solving national and international technical problems; To support the transition to market-based economics; To support basic and applied research; To help integrate CIS weapons scientists into the international scientific community. The projects may be funded both through governmental funds of the Funding partners of the ISTC. According to the ISTC Statute, approved by the appropriate national organizations, funds used within ISTC projects are exempt from CIS taxes. As of March 1998, more than 1500 proposals had been submitted to the Center, of which 551 were approved for funding, for a total value of approximately US$166 million. The number of scientists and engineers participating in the projects is more than 18000. There are about 20 funded and as yet nonfunded projects related to various problems of research reactors. Many of them address safety issues. Information review of the results and plans of both ongoing projects and as yet nonfunded proposals related to research reactors will be presented with the aim assisting international researchers to establish partnerships or collaboration with ISTC projects. The following groups of ISTC projects will be represented: 1. complex computer simulator s for research reactors; 2. reactor facility decommissioning; 3. neutron sources for medicine; 4
18 CFR 157.37 - Project design.
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Project design. 157.37... Seasons for Alaska Natural Gas Transportation Projects § 157.37 Project design. In reviewing any... proposed project has been designed to accommodate the needs of shippers who have made conforming bids...
George, Paul; Kemeny, Andras; Colombet, Florent; Merienne, Frédéric; Chardonnet, Jean-Rémy; Thouvenin, Indira Mouttapa
2014-02-01
Immersive digital project reviews consist in using virtual reality (VR) as a tool for discussion between various stakeholders of a project. In the automotive industry, the digital car prototype model is the common thread that binds them. It is used during immersive digital project reviews between designers, engineers, ergonomists, etc. The digital mockup is also used to assess future car architecture, habitability or perceived quality requirements with the aim to reduce using physical mockups for optimized cost, delay and quality efficiency. Among the difficulties identified by the users, handling the mockup is a major one. Inspired by current uses of nomad devices (multi-touch gestures, IPhone UI look'n'feel and AR applications), we designed a navigation technique taking advantage of these popular input devices: Space scrolling allows moving around the mockup. In this paper, we present the results of a study we conducted on the usability and acceptability of the proposed smartphone-based interaction metaphor compared to traditional technique and we provide indications of the most efficient choices for different use-cases accordingly. It was carried out in a traditional 4-sided CAVE and its purpose is to assess a chosen set of interaction techniques to be implemented in Renault's new 5-sides 4K x 4K wall high performance CAVE. The proposed new metaphor using nomad devices is well accepted by novice VR users and future implementation should allow an efficient industrial use. Their use is an easy and user friendly alternative of the existing traditional control devices such as a joystick.
de Wolff, Alice
From 1995-1998, 12 of the 79 organizations funded by Canada's National Literacy Secretariat (NLS) conducted approximately 40 workplace literacy pilot projects across Canada. Those projects were reviewed to determine their effectiveness in increasing the number and quality of Canadian workplace literacy programs. Information for the review was…
Hawaii Energy Strategy Project 2: Fossil Energy Review. Task IV. Scenario development and analysis
Energy Technology Data Exchange (ETDEWEB)
Yamaguchi, N.D.; Breazeale, K. [ed.
1993-12-01
The Hawaii Energy Strategy (HES) Program is a seven-project effort led by the State of Hawaii Department of Business, Economic Development & Tourism (DBEDT) to investigate a wide spectrum of Hawaii energy issues. The East-West Center`s Program on Resources: Energy and Minerals, has been assigned HES Project 2, Fossil Energy Review, which focuses on fossil energy use in Hawaii and the greater regional and global markets. HES Project 2 has four parts: Task I (World and Regional Fossil Energy Dynamics) covers petroleum, natural gas, and coal in global and regional contexts, along with a discussion of energy and the environment. Task II (Fossil Energy in Hawaii) focuses more closely on fossil energy use in Hawaii: current utilization and trends, the structure of imports, possible future sources of supply, fuel substitutability, and energy security. Task III`s emphasis is Greenfield Options; that is, fossil energy sources not yet used in Hawaii. This task is divided into two sections: first, an in-depth {open_quotes}Assessment of Coal Technology Options and Implications for the State of Hawaii,{close_quotes} along with a spreadsheet analysis model, which was subcontracted to the Environmental Assessment and Information Sciences Division of Argonne National Laboratory; and second, a chapter on liquefied natural gas (LNG) in the Asia-Pacific market and the issues surrounding possible introduction of LNG into the Hawaii market.
Strategic plan: A tool to improve IPP project earnings
International Nuclear Information System (INIS)
LeClerc, S.
1997-01-01
This paper presents a strategic plan to analyze and convert project operations to gain short-term and long-term economic benefits. Areas of Opportunity were identified which may result in improved project economics from Independent Power Producers' project reviews. This paper discusses each Area of Opportunity, suggests options for investigation, and provides a potential magnitude of upside for solid fuel circulating fluidized bed projects in the 50 MW project size. The Areas of Opportunity are: (1) Power Purchase Agreement Modifications; (2) Fuel Use Optimization; (3) Power Plant Upgrades; (4) Power Plant Depreciation Schedule And FAS 121 Analysis; (5) Operation ampersand Maintenance Review; (6) Financial Contract Review; (7) Environmental Review; (8) Insurance Coverage Review; (9) Internal Management Review; and (10) Strategic Development For Energy Sales. Ten appendices are included which comprise a sample Strategic Plan: (1) Potential Plant Upgrades, (2) Enhancement Criteria, (3) Age of Coal Burning Plants, (4) Btu Energy Price Summary, (5) Typical Operation and Maintenance Audit Findings, (6) Typical Performance Objectives and Guidelines, (7) Typical Heavy Metal Emissions, (8) Typical Strategic Plan Formulation, (9) Strategic Plan Implementation Schedule, and (10) Typical Decision Tree. 8 refs
Independent technical review, handbook
International Nuclear Information System (INIS)
1994-02-01
Purpose Provide an independent engineering review of the major projects being funded by the Department of Energy, Office of Environmental Restoration and Waste Management. The independent engineering review will address questions of whether the engineering practice is sufficiently developed to a point where a major project can be executed without significant technical problems. The independent review will focus on questions related to: (1) Adequacy of development of the technical base of understanding; (2) Status of development and availability of technology among the various alternatives; (3) Status and availability of the industrial infrastructure to support project design, equipment fabrication, facility construction, and process and program/project operation; (4) Adequacy of the design effort to provide a sound foundation to support execution of project; (5) Ability of the organization to fully integrate the system, and direct, manage, and control the execution of a complex major project
Independent technical review, handbook
Energy Technology Data Exchange (ETDEWEB)
1994-02-01
Purpose Provide an independent engineering review of the major projects being funded by the Department of Energy, Office of Environmental Restoration and Waste Management. The independent engineering review will address questions of whether the engineering practice is sufficiently developed to a point where a major project can be executed without significant technical problems. The independent review will focus on questions related to: (1) Adequacy of development of the technical base of understanding; (2) Status of development and availability of technology among the various alternatives; (3) Status and availability of the industrial infrastructure to support project design, equipment fabrication, facility construction, and process and program/project operation; (4) Adequacy of the design effort to provide a sound foundation to support execution of project; (5) Ability of the organization to fully integrate the system, and direct, manage, and control the execution of a complex major project.
Licensing Review in R+D Projects
Alessandro, Orsi
2014-01-01
FOSS packages are becoming ever more present in R&D projects carried out a variety of entities, including large corporations. I will focus on how legal risks associated with the use of FOSS licenses can be assessed and discuss measures directed to risk mitigation.
NASA TEERM Hexavalent Chrome Alternatives Projects
Kessel, Kurt; Rothgeb, Matt
2011-01-01
This slide presentation reviews the NASA project to select an alternative to hexavalent chrome in the aerospace industry. Included is a recent historic testing and research that the Agency has performed on (1) the external tank, (2) the shuttle orbiter, (3) the Shuttle Rocket Booster, and (4) the Space Shuttle Main Engine. Other related Technology Evaluation for Environmental Risk Mitigation (TEERM) projects are reviewed. The Phase I process of the project performed testing of alternatives the results are shown in a chart for different coating systems. International collaboration was also reviewed. Phase II involves further testing of pretreatment and primers for 6 and 12 months of exposure to conditions at Launch Pad and the beach. Further test were performed to characterize the life cycle corrosion of the space vehicles. A new task is described as a joint project with the Department of Defense to identify a Hex Chrome Free Coatings for Electronics.
Something of value Governance of Projects in the Project-Based Organisation
DEFF Research Database (Denmark)
Riis, Eva
2013-01-01
The paper presents a conceptual framework for studying Governance of Projects and issues of value in the project-based organisation. Attempts at exploring and conceptualising the issues in the current literature are reviewed. Issues pertinent to gaining value by Governance of Projects have mainly...... for a better understanding of Governance of Projects and value contribution. The findings presented here form the conceptual foundation for subsequent empirical studies of value by Governance of Projects....... been explored from the perspective of economic theory. Models found in the literature are not typically concerned with value for the implementing organisation as a whole; their scope is limited to the time just after project completion. No valid, empirically-based models of value creation by Governance...
Energy Technology Data Exchange (ETDEWEB)
Martin, Robert C.; Mehrhoff, L.A.
1985-01-01
The Pacific Northwest Electric Power Planning and Conservation Act and wildlife and their habitats in the Columbia River Basin and to compliance with the Program, the wildlife mitigation status reports coordination with resource agencies and Indian Tribes. developed the Columbia River Basin Fish and Wildlife Program development, operation, and maintenance of hydroelectric projects on existing agreements; and past, current, and proposed wildlife factual review and documentation of existing information on wildlife meet the requirements of Measure 1004(b)(l) of the Program. The mitigation, enhancement, and protection activities were considered. In mitigate for the losses to those resources resulting from the purpose of these wildlife mitigation status reports is to provide a resources at some of the Columbia River Basin hydroelectric projects the river and its tributaries. To accomplish this goal, the Council were written with the cooperation of project operators, and in within Idaho.
Thys, Miranda; Verschaffel, Lieven; Van Dooren, Wim; Laevers, Ferre
2016-01-01
This paper provides a systematic review of instruments that have the potential to measure the quality of project-based science and technology (S&T) learning environments in elementary school. To this end, a comprehensive literature search was undertaken for the large field of S&T learning environments. We conducted a horizontal bottom-up…
International Nuclear Information System (INIS)
1996-01-01
The Sampling and Analysis Plan describes the sampling and analytical activities which will be performed to support closure of the 100-D Ponds at the Hanford Reservation. This report contains responses by the US Department of Energy to Ecology review for ''Sampling and Analysis Plan for the 100-D Ponds Voluntary Remediation Project.''
International Nuclear Information System (INIS)
Stine, M.D.
1995-01-01
The purpose of this paper is to develop and document a proposed position on the performance of independent peer reviews on selected design and analysis components of the Title 1 [Preliminary] and Title 2 [Final] design phases of the Multi-Function Waste Tank Facility [MWTF] project. An independent, third-party peer review is defined as a documented critical review of documents, data, designs, design inputs, tests, calculations, or related materials. The peer review should be conducted by persons independent of those who performed the work, but who are technically qualified to perform the original work. The peer review is used to assess the validity of assumptions and functional requirements, to assess the appropriateness and logic of selected methodologies and design inputs, and to verify calculations, analyses and computer software. The peer review can be conducted at the end of the design activity, at specific stages of the design process, or continuously and concurrently with the design activity. This latter method is often referred to as ''Continuous Peer Review.''
Energy Technology Data Exchange (ETDEWEB)
Elicio, Andy U. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)
2015-05-05
My ERM 593 applied project will provide guidance for the Los Alamos National Laboratory Waste Stream Profile reviewer (i.e. RCRA reviewer) in regards to Reviewing and Approving a Waste Stream Profile in the Waste Compliance and Tracking System. The Waste Compliance and Tracking system is called WCATS. WCATS is a web-based application that “supports the generation, characterization, processing and shipment of LANL radioactive, hazardous, and industrial waste.” The LANL generator must characterize their waste via electronically by filling out a waste stream profile (WSP) in WCATS. Once this process is completed, the designated waste management coordinator (WMC) will perform a review of the waste stream profile to ensure the generator has completed their waste stream characterization in accordance with applicable state, federal and LANL directives particularly P930-1, “LANL Waste Acceptance Criteria,” and the “Waste Compliance and Tracking System User's Manual, MAN-5004, R2,” as applicable. My guidance/applied project will describe the purpose, scope, acronyms, definitions, responsibilities, assumptions and guidance for the WSP reviewer as it pertains to each panel and subpanel of a waste stream profile.
Strahl, A; Gerlich, C; Wolf, H-D; Gehrke, J; Müller-Garnn, A; Vogel, H
2016-03-01
The sociomedical evaluation by the German Pension Insurance serves the purpose of determining entitlement to disability pensions. A quality assurance concept for the sociomedical evaluation was developed, which is based on a peer Review process. Peer review is an established process of external quality assurance in health care. The review is based on a hierarchically constructed manual that was evaluated in this pilot project. The database consists of 260 medical reports for disability pension of 12 pension insurance agencies. 771 reviews from 19 peers were included in the evaluation of the inter-rater reliability. Kendall's coefficient of concordance W for more than 2 raters is used as primary measure of inter-rater reliability. Reliability appeared to be heterogeneous. Kendalls W varies for the particular criteria from 0.09 to 0.88 and reached for primary criterion reproducibility a value of 0.37. The reliability of the manual seemed acceptable in the context of existing research data and is in line with existing peer review research outcomes. Nevertheless, the concordance is limited and requires optimisation. Starting points for improvement can be seen in a systematic training and regular user meetings of the peers involved. © Georg Thieme Verlag KG Stuttgart · New York.
SKB's Project SAFE for the SFR 1 Repository. A Review by Consultants to SKI
International Nuclear Information System (INIS)
Chapman, N.A.; Maul, P.R.; Robinson, P.C.; Savage, D.
2002-06-01
The SFR 1 repository used for final disposal of low- and intermediate level radioactive waste produced by the Swedish nuclear power programme, industry, medicine and research. In 1992 it was granted a full-scale operating permit following additional reporting on long-term safety aspects by SKB, including the first in-depth safety assessment in 1991. It was stipulated as part of the full-scale licence for SFR 1 that a revised safety assessment should be carried out by SKB at least every ten years during the continued operation of the facility. The first 10-year SKB re-evaluation, called 'Project SAFE', was submitted to the regulators in 2001. The review of Project SAFE presented in this report is the culmination of several years' work with SKI including: 1. The extension and application of SKI's 'systems' approach to set up a description of the SFR 1 repository using Process Influence Diagrams (PIDs). 2. Participation in the development of a flexible Performance Assessment (PA) software tool (the AMBER code) that enables time-dependent analyses to be made of system behaviour. 3. Use of the PID database to explore, from first principles, issues that are likely to be important in the safety performance of SFR 1 and thereby to identify topics to be explored by PA modelling. 4. Peer review of the main SKB Project SAFE supporting documentation to evaluate quality, completeness and the implications of the results. 5. An independent PA exercise, using the AMBER code. 6. A review of an English translation of Section 5 of SKB's Project SAFE Final Safety Report. The present report covers only items 3 to 6, and a separate report provides a more detailed description of item 5. As a result of this review, the key issues that the regulatory authorities will need to address when reviewing SKB's safety case for SFR 1 have been identified as: 1. There is no clear statement of SKB's overall safety concept for SFR 1. It is therefore difficult to judge the results of the PA against
The fracture zone project - final report
International Nuclear Information System (INIS)
Andersson, Peter
1993-09-01
This report summarizes the work and the experiences gained during the fracture zone project at the Finnsjoen study site. The project is probably the biggest effort, so far, to characterize a major fracture zone in crystalline bedrock. The project was running between 1984-1990 involving a large number of geological, geohydrological, geochemical, and geomechanical investigation. The methods used for identification and characterization are reviewed and discussed in terms of applicability and possible improvements for future investigations. The discussion is exemplified with results from the investigation within the project. Flow and transport properties of the zone determined from hydraulic tests and tracer tests are discussed. A large number of numerical modelling efforts performed within the fracture zone project, the INTRAVAL project, and the SKB91-study are summarized and reviewed. Finally, occurrence of similar zones and the relevance of major low angle fracture zones in connection to the siting of an underground repository is addressed
General risks for tunnelling projects: An overview
Siang, Lee Yong; Ghazali, Farid E. Mohamed; Zainun, Noor Yasmin; Ali, Roslinda
2017-10-01
Tunnels are indispensable when installing new infrastructure as well as when enhancing the quality of existing urban living due to their unique characteristics and potential applications. Over the past few decades, there has been a significant increase in the building of tunnels, world-wide. Tunnelling projects are complex endeavors, and risk assessment for tunnelling projects is likewise a complex process. Risk events are often interrelated. Occurrence of a technical risk usually carries cost and schedule consequences. Schedule risks typically impact cost escalation and project overhead. One must carefully consider the likelihood of a risk's occurrence and its impact in the context of a specific set of project conditions and circumstances. A project's goals, organization, and environment impacts in the context of a specific set of project conditions and circumstances. Some projects are primarily schedule driven; other projects are primarily cost or quality driven. Whether a specific risk event is perceived fundamentally as a cost risk or a schedule risk is governed by the project-specific context. Many researchers have pointed out the significance of recognition and control of the complexity, and risks of tunnelling projects. Although all general information on a project such as estimated duration, estimated cost, and stakeholders can be obtained, it is still quite difficult to accurately understand, predict and control the overall situation and development trends of the project, leading to the risks of tunnelling projects. This paper reviews all the key risks for tunnelling projects from several case studies that have been carried out by other researchers. These risks have been identified and reviewed in this paper. As a result, the current risk management plan in tunnelling projects can be enhanced by including all these reviewed risks as key information.
Annual review of research projects 1984
International Nuclear Information System (INIS)
Keam, D.W.
1986-02-01
This progress report provides a brief outline of current laboratory research and development projects and their present status. Research fields covered are: uranium, radon and its daughters, radiation effects in solids and gases, x-rays and clinical dosimetry, measurement standards in radiation dosimetry, radiopharmaceuticals and nuclear medicine, non-ionizing electromagnetic radiations, environmental radiochemistry and radiation monitoring
Annual review of research projects 1983
International Nuclear Information System (INIS)
1985-08-01
This progress report provides a brief outline of current laboratory research and development projects and their present status. Research fields covered are: uranium, radon and its daughters, radiation effects in solids and gases, thermoluminescence, x-rays and clinical dosimetry, measurement standards in radiation dosimetry, radiopharmaceuticals and nuclear medicine, radionuclide metrology, non-ionizing electromagnetic radiations, environmental radiochemistry and radiation monitoring
Swedish encapsulation station review
International Nuclear Information System (INIS)
Andersson, Sven Olof; Brunzell, P.; Heibel, R.; McCarthy, J.; Pennington, C.; Rusch, C.; Varley, G.
1998-06-01
In the Encapsulation Station (ES) Review performed by NAC International, a number of different areas have been studied. The main objectives with the review have been to: Perform an independent review of the cost estimates for the ES presented in SKB's document 'Plan 1996'. This has been made through comparisons between the ES and BNFL's Waste Encapsulation Plant (WEP) at Sellafield as well as with the CLAB facility. Review the location of the ES (at the CLAB site or at the final repository) and its interaction with other parts of the Swedish system for spent fuel management. Review the logistics and plant capacity of the ES. Identify important safety aspects of the ES as a basis for future licensing activities. Based on NAC International's experience of casks for transport and storage of spent fuel, review the basic design of the copper/steel canister and the transport cask. This review insides design, manufacturing, handling and licensing aspects. Perform an overall comparison between the ES project and the CLAB project with the objective to identify major project risks and discuss their mitigation
Highway project cost estimating and management.
2009-02-01
"This report provides detailed information about the project objectives, deliverables, and findings. The project team : thoroughly reviewed the Montana Department of Transportation (MDT) structure, operations, and current procedures as : related to M...
Energy Technology Data Exchange (ETDEWEB)
Vine, E.; Sathaye, J.
1997-12-01
Because of concerns with the growing threat of global climate change from increasing emissions of greenhouse gases, the US and other countries are implementing, by themselves or in cooperation with one or more other nations (i.e., joint implementation), climate change mitigation projects. These projects will reduce greenhouse gas (GHG) emissions or sequester carbon, and will also result in non-GHG impacts (i.e., environmental, economic, and social impacts). Monitoring, evaluating, reporting, and verifying (MERV) guidelines are needed for these projects in order to accurately determine their net GHG, and other, benefits. Implementation of MERV guidelines is also intended to: (1) increase the reliability of data for estimating GHG benefits; (2) provide real-time data so that mid-course corrections can be made; (3) introduce consistency and transparency across project types and reporters; and (4) enhance the credibility of the projects with stakeholders. In this paper, the authors review the issues and methodologies involved in MERV activities. In addition, they review protocols and guidelines that have been developed for MERV of GHG emissions in the energy and non-energy sectors by governments, nongovernmental organizations, and international agencies. They comment on their relevance and completeness, and identify several topics that future protocols and guidelines need to address, such as (1) establishing a credible baseline; (2) accounting for impacts outside project boundaries through leakage; (3) net GHG reductions and other impacts; (4) precision of measurement; (5) MERV frequency; (6) persistence (sustainability) of savings, emissions reduction, and carbon sequestration; (7) reporting by multiple project participants; (8) verification of GHG reduction credits; (9) uncertainty and risk; (10) institutional capacity in conducting MERV; and (11) the cost of MERV.
Learning from open source software projects to improve scientific review.
Ghosh, Satrajit S; Klein, Arno; Avants, Brian; Millman, K Jarrod
2012-01-01
Peer-reviewed publications are the primary mechanism for sharing scientific results. The current peer-review process is, however, fraught with many problems that undermine the pace, validity, and credibility of science. We highlight five salient problems: (1) reviewers are expected to have comprehensive expertise; (2) reviewers do not have sufficient access to methods and materials to evaluate a study; (3) reviewers are neither identified nor acknowledged; (4) there is no measure of the quality of a review; and (5) reviews take a lot of time, and once submitted cannot evolve. We propose that these problems can be resolved by making the following changes to the review process. Distributing reviews to many reviewers would allow each reviewer to focus on portions of the article that reflect the reviewer's specialty or area of interest and place less of a burden on any one reviewer. Providing reviewers materials and methods to perform comprehensive evaluation would facilitate transparency, greater scrutiny, and replication of results. Acknowledging reviewers makes it possible to quantitatively assess reviewer contributions, which could be used to establish the impact of the reviewer in the scientific community. Quantifying review quality could help establish the importance of individual reviews and reviewers as well as the submitted article. Finally, we recommend expediting post-publication reviews and allowing for the dialog to continue and flourish in a dynamic and interactive manner. We argue that these solutions can be implemented by adapting existing features from open-source software management and social networking technologies. We propose a model of an open, interactive review system that quantifies the significance of articles, the quality of reviews, and the reputation of reviewers.
Project planning of Gen-IV sodium cooled fast reactor technology
Energy Technology Data Exchange (ETDEWEB)
Yoo, Jaewoon; Joo, H. K.; Cho, C. H.; Kim, Y. G.; Lee, D. U.; Jin, M. W.
2013-05-15
The project program will be established to shorten the design schedule by sharing the design man power and experimental facility, and by introducing the proven technology through international collaboration and the project plan including preliminary specific design, technology validation and fuel design validation plan will be more detail by reviewing the plan at the International Technical Review Meeting (ITRM). Periodic project progress review meeting will be held to find the technical issues and to resolve them. The results of the progress review meeting will be reflected into the final assessment of research project. The project progress review meeting will be held every quarter and external expert will also participate in the meeting. In parallel with the PGSFR development, innovative small modular SFR will be developed aiming to the international nuclear market. The system and component technologies of both system can be shared but innovative concept will be implemented into the design. Ultra long life core design concept and supercritical CO{sub 2} Brayton cycle will be considered as the innovative concept for enhancing the plant economy and safety.
Project planning of Gen-IV sodium cooled fast reactor technology
International Nuclear Information System (INIS)
Yoo, Jaewoon; Joo, H. K.; Cho, C. H.; Kim, Y. G.; Lee, D. U.; Jin, M. W.
2013-05-01
The project program will be established to shorten the design schedule by sharing the design man power and experimental facility, and by introducing the proven technology through international collaboration and the project plan including preliminary specific design, technology validation and fuel design validation plan will be more detail by reviewing the plan at the International Technical Review Meeting (ITRM). Periodic project progress review meeting will be held to find the technical issues and to resolve them. The results of the progress review meeting will be reflected into the final assessment of research project. The project progress review meeting will be held every quarter and external expert will also participate in the meeting. In parallel with the PGSFR development, innovative small modular SFR will be developed aiming to the international nuclear market. The system and component technologies of both system can be shared but innovative concept will be implemented into the design. Ultra long life core design concept and supercritical CO 2 Brayton cycle will be considered as the innovative concept for enhancing the plant economy and safety
The DLESE Evaluation Toolkit Project
Buhr, S. M.; Barker, L. J.; Marlino, M.
2002-12-01
The Evaluation Toolkit and Community project is a new Digital Library for Earth System Education (DLESE) collection designed to raise awareness of project evaluation within the geoscience education community, and to enable principal investigators, teachers, and evaluators to implement project evaluation more readily. This new resource is grounded in the needs of geoscience educators, and will provide a virtual home for a geoscience education evaluation community. The goals of the project are to 1) provide a robust collection of evaluation resources useful for Earth systems educators, 2) establish a forum and community for evaluation dialogue within DLESE, and 3) disseminate the resources through the DLESE infrastructure and through professional society workshops and proceedings. Collaboration and expertise in education, geoscience and evaluation are necessary if we are to conduct the best possible geoscience education. The Toolkit allows users to engage in evaluation at whichever level best suits their needs, get more evaluation professional development if desired, and access the expertise of other segments of the community. To date, a test web site has been built and populated, initial community feedback from the DLESE and broader community is being garnered, and we have begun to heighten awareness of geoscience education evaluation within our community. The web site contains features that allow users to access professional development about evaluation, search and find evaluation resources, submit resources, find or offer evaluation services, sign up for upcoming workshops, take the user survey, and submit calendar items. The evaluation resource matrix currently contains resources that have met our initial review. The resources are currently organized by type; they will become searchable on multiple dimensions of project type, audience, objectives and evaluation resource type as efforts to develop a collection-specific search engine mature. The peer review
Learning from open source software projects to improve scientific review
Directory of Open Access Journals (Sweden)
Satrajit S Ghosh
2012-04-01
Full Text Available Peer-reviewed publications are the primary mechanism for sharing scientific results. The current peer-review process is, however, fraught with many problems that undermine the pace, validity, and credibility of science. We highlight five salient problems: (1 Reviewers are expected to have comprehensive expertise; (2 Reviewers do not have sufficient access to methods and materials to evaluate a study; (3 Reviewers are not acknowledged; (4 There is no measure of the quality of a review; and (5 Reviews take a lot of time, and once submitted cannot evolve. We propose that these problems can be resolved by making the following changes to the review process. Distributing reviews to many reviewers would allow each reviewer to focus on portions of the article that reflect the reviewer’s specialty or area of interest and place less of a burden on any one reviewer, enabling a more comprehensive and timely review. Providing reviewers materials and methods to perform comprehensive evaluation would facilitate transparency, replication of results and enable greater scrutiny by people from different fields using different nomenclature, leading to greater clarity and cross-fertilization of ideas. Acknowledging reviewers makes it possible to quantitatively assess reviewer contributions, which could be integrated with assessments for promotions and grants. Quantifying review quality could help establish the importance of reviewers and information generated during a review, and assess the importance of a submitted article. Finally, we recommend expediting post-publication reviews and allowing for the dialogue to continue and flourish in a dynamic and interactive manner. We argue that these solutions can be addressed by building upon computer programming code management systems. In this article, we provide examples of current code review systems that offer opportunities for addressing the above problems, and offer suggestions for enhancing code review systems for
Discourses and Theoretical Assumptions in IT Project Portfolio Management
DEFF Research Database (Denmark)
Hansen, Lars Kristian; Kræmmergaard, Pernille
2014-01-01
DISCOURSES AND THEORETICAL ASSUMPTIONS IN IT PROJECT PORTFOLIO MANAGEMENT: A REVIEW OF THE LITERATURE These years increasing interest is put on IT project portfolio management (IT PPM). Considering IT PPM an interdisciplinary practice, we conduct a concept-based literature review of relevant...
Engineering Technical Review Planning Briefing
Gardner, Terrie
2012-01-01
The general topics covered in the engineering technical planning briefing are 1) overviews of NASA, Marshall Space Flight Center (MSFC), and Engineering, 2) the NASA Systems Engineering(SE) Engine and its implementation , 3) the NASA Project Life Cycle, 4) MSFC Technical Management Branch Services in relation to the SE Engine and the Project Life Cycle , 5) Technical Reviews, 6) NASA Human Factor Design Guidance , and 7) the MSFC Human Factors Team. The engineering technical review portion of the presentation is the primary focus of the overall presentation and will address the definition of a design review, execution guidance, the essential stages of a technical review, and the overall review planning life cycle. Examples of a technical review plan content, review approaches, review schedules, and the review process will be provided and discussed. The human factors portion of the presentation will focus on the NASA guidance for human factors. Human factors definition, categories, design guidance, and human factor specialist roles will be addressed. In addition, the NASA Systems Engineering Engine description, definition, and application will be reviewed as background leading into the NASA Project Life Cycle Overview and technical review planning discussion.
Hickman, Louise D; DiGiacomo, Michelle; Phillips, Jane; Rao, Angela; Newton, Phillip J; Jackson, Debra; Ferguson, Caleb
2018-04-01
The nursing profession has a significant evidence to practice gap in an increasingly complex and dynamic health care environment. To evaluate effectiveness of teaching and learning strategies related to a capstone project within a Masters of Nursing program that encourage the development of evidence based practice capabilities. Systematic review that conforms to the PRISMA statement. Master's Nursing programs that include elements of a capstone project within a university setting. MEDLINE, CINAHL, Cochrane Database of Systematic Reviews, ERIC and PsycInfo were used to search for RCT's or quasi experimental studies conducted between 1979 and 9 June 2017, published in a peer reviewed journal in English. Of 1592 studies, no RCT's specifically addressed the development of evidence based practice capabilities within the university teaching environment. Five quasi-experimental studies integrated blended learning, guided design processes, small group work, role play and structured debate into Masters of Nursing research courses. All five studies demonstrated some improvements in evidence based practice skills and/or research knowledge translation, with three out of five studies demonstrating significant improvements. There is a paucity of empirical evidence supporting the best strategies to use in developing evidence based practice skills and/or research knowledge translation skills for Master's Nursing students. As a profession, nursing requires methodologically robust studies that are discipline specific to identify the best approaches for developing evidence-based practice skills and/or research knowledge translation skills within the university teaching environment. Provision of these strategies will enable the nursing profession to integrate the best empirical evidence into nursing practice. Copyright © 2018. Published by Elsevier Ltd.
Gentil, Marie-Line; Cuggia, Marc; Fiquet, Laure; Hagenbourger, Camille; Le Berre, Thomas; Banâtre, Agnès; Renault, Eric; Bouzille, Guillaume; Chapron, Anthony
2017-09-25
Primary care data gathered from Electronic Health Records are of the utmost interest considering the essential role of general practitioners (GPs) as coordinators of patient care. These data represent the synthesis of the patient history and also give a comprehensive picture of the population health status. Nevertheless, discrepancies between countries exist concerning routine data collection projects. Therefore, we wanted to identify elements that influence the development and durability of such projects. A systematic review was conducted using the PubMed database to identify worldwide current primary care data collection projects. The gray literature was also searched via official project websites and their contact person was emailed to obtain information on the project managers. Data were retrieved from the included studies using a standardized form, screening four aspects: projects features, technological infrastructure, GPs' roles, data collection network organization. The literature search allowed identifying 36 routine data collection networks, mostly in English-speaking countries: CPRD and THIN in the United Kingdom, the Veterans Health Administration project in the United States, EMRALD and CPCSSN in Canada. These projects had in common the use of technical facilities that range from extraction tools to comprehensive computing platforms. Moreover, GPs initiated the extraction process and benefited from incentives for their participation. Finally, analysis of the literature data highlighted that governmental services, academic institutions, including departments of general practice, and software companies, are pivotal for the promotion and durability of primary care data collection projects. Solid technical facilities and strong academic and governmental support are required for promoting and supporting long-term and wide-range primary care data collection projects.
International Nuclear Information System (INIS)
Tocheniy, L.; Rudneva, V.Ya.
1998-01-01
1. ISTC - history, activities, outlook: The ISTC is an intergovernmental organization established by agreement between the Russian Federation, the European Union, Japan, and the United States. Since 1994, Finland, Sweden, Norway, Georgia, Armenia, Belarus, Kazakhstan and the Kyrgyz Republic have acceded to the Agreement and Statute. At present, the Republic of Korea is finishing the process of accession to the ISTC. All work of the ISTC is aimed at the goals defined in the ISTC Agreement: - To give CIS weapons scientists, particularly those who possess knowledge and skills related to weapons of mass destruction and their delivery systems, the opportunities to redirect their talents to peaceful activities; - To contribute to solving national and international technical problems; - To support the transition to market-based economies; - To support basic and applied research; - To help integrate CIS weapons scientists into the international scientific community. The projects may be funded both through governmental funds of the Funding Parties specified for the ISTC, and by organizations, nominated as Funding Partners of the ISTC. According to the ISTC Statute, approved by the appropriate national organizations, funds used within ISTC projects are exempt from CIS taxes. As of March 1998, more than 1500 proposals had been submitted to the Center, of which 541 were approved for funding, for a total value of approximately US dollars 165 million. The number of scientists and engineers participating in the projects is more than 17,000. 2. Projects Related to Research Reactors: There are about 20 funded and as yet non-funded projects related to various problems of research reactors. Many of them address safety issues. Information review of the results and plans of both ongoing projects and as yet non-funded proposals related to research reactors will be presented with the aim assisting international researchers to establish partnerships or collaboration with ISTC projects
The role of project planning in project management
Klitsenko, A. I.; Клиценко, А. И.
2013-01-01
This article describes the importance of the process of project planning. The author gives irrefutable arguments concerning crucial role of project planning. This article presents the definition, objects and the main goal of project planning. The purpose of this article is to review such objects of project planning as project scope, risk and human resources. Данная статья описывает важность процесса проектного планирования. Автор дает неопровержимые доводы, касающиеся решающей роли проектн...
DEFF Research Database (Denmark)
Hermansen, Nanna Kastrup; Vestergaard, Anne Sig; Ehlers, Lars Holger
, and if the authors provide scientific evidence that their choice of effect measure, i.e. the quality indicator, is associated with patients’ health. Methods The basis of the present study was a systematic review of studies on PDSA quality improvement projects published in 2015-2017. For all identified papers...... as such. Conclusion Process indicators, rather than health-related outcome measures, appear to be used most often in quality improvement projects applying the PDSA method. Evidence-based indicators were only applied in four studies. Overall, this challenges the ability to show if, and how, interventions......Abstract Introduction Quality improvement is an inherent part of modern healthcare systems worldwide, used for the continuous advancement in effectiveness and safety. Amongst other approaches, the plan-do-study-act (PDSA) method, a four-step iterative method, is widely used for testing...
36 CFR 1010.14 - Review of proposals by project applicants.
2010-07-01
...) With respect to each project proposed for consideration for which the NEPA Compliance Coordinator... the scope and content of the final EA. (e) With respect to each project proposed for consideration for... Trust and who certify that they have no financial or other interest in the outcome of the project, and...
A review of Studsvik's international power ramp test projects
International Nuclear Information System (INIS)
Mogard, H.; Kjaer-Pedersen, N.
1985-11-01
Since 1975 a series of internationally sponsored fuel irradiation research projects have been and are being conducted at Studsvik, Sweden, under the management of Studsvik Energiteknik AB. The sponsoring parties comprise fuel vendors, nuclear power utilities, national research organizations and, in some cases, safety authorities. Geographically the parties represent organizations in Europe, Japan, and the USA. The main research topic of the Studsvik projects is the Pellet Clad Interaction (PCI) induced Stress Corrosion Cracking (SCC) failure occurrence in LWR fuel under power ramping conditions. The research is conducted in the 50 MW R2 test reactor and the associated hot cell laboratory. Prior to the experiments the test fuel is base irradiated, normally in commercially operated light water reactors. Results have been published for the INTER-RAMP, OVER-RAMP, DEMO-RAMP I, DEMO-RAMP II and SUPER-RAMP projects. The release of the TRANS-RAMP I results is imminent. There are two ongoing projects, i.e. SUPER-RAMP EXTENSION and TRANS-RAMP II. The paper presents an overview of the objectives and main results of the various projects. An attempt is made to summarize the more important observations on PCI failure performance in the perspective of design parameters, fuel burnup levels, power histories, power ramp rates, etc. With 14 refs. (Author)
Lewis, Cara C; Stanick, Cameo F; Martinez, Ruben G; Weiner, Bryan J; Kim, Mimi; Barwick, Melanie; Comtois, Katherine A
2015-01-08
Identification of psychometrically strong instruments for the field of implementation science is a high priority underscored in a recent National Institutes of Health working meeting (October 2013). Existing instrument reviews are limited in scope, methods, and findings. The Society for Implementation Research Collaboration Instrument Review Project's objectives address these limitations by identifying and applying a unique methodology to conduct a systematic and comprehensive review of quantitative instruments assessing constructs delineated in two of the field's most widely used frameworks, adopt a systematic search process (using standard search strings), and engage an international team of experts to assess the full range of psychometric criteria (reliability, construct and criterion validity). Although this work focuses on implementation of psychosocial interventions in mental health and health-care settings, the methodology and results will likely be useful across a broad spectrum of settings. This effort has culminated in a centralized online open-access repository of instruments depicting graphical head-to-head comparisons of their psychometric properties. This article describes the methodology and preliminary outcomes. The seven stages of the review, synthesis, and evaluation methodology include (1) setting the scope for the review, (2) identifying frameworks to organize and complete the review, (3) generating a search protocol for the literature review of constructs, (4) literature review of specific instruments, (5) development of an evidence-based assessment rating criteria, (6) data extraction and rating instrument quality by a task force of implementation experts to inform knowledge synthesis, and (7) the creation of a website repository. To date, this multi-faceted and collaborative search and synthesis methodology has identified over 420 instruments related to 34 constructs (total 48 including subconstructs) that are relevant to implementation
Marketing Industrial Project-Related Services: A Literature Review and Theoretical Synthesis
DEFF Research Database (Denmark)
Skaates, Maria Anne; Cova, Bernard
2002-01-01
Services are a growing part of projects in the context of the international trend towards solution buying and selling on business-to-business markets. Furthermore services are often a key source of competitive advantage in project business. However companies selling project-related services often...... that specifically deal with project-related services are listed as the result of a study of the English-, French-, German, Italian-, and 'Nordic'-language academic literature. They are then assessed in relation to services versus project marketing theory. The analysis shows that the project marketing concepts...
18 CFR 806.4 - Projects requiring review and approval.
2010-04-01
... result of a change of the name, identity, internal corporate structure or place of organization and does... period, and undergoing a change of ownership, unless such project satisfies the requirements of..., and undergoing a change of ownership, unless such project satisfies the requirements of paragraphs (b...
Review of Time Management for the Research Reactor Project
Energy Technology Data Exchange (ETDEWEB)
Park, Kook-Nam; Park, Su-Jin; Choi, Min-Ho; Yoon, Hyung-Mo; Kim, Hyeonil [KAERI, Daejeon (Korea, Republic of); Lee, Eung-Jae [DAEWOO E and C, Seoul (Korea, Republic of)
2016-05-15
In this paper, the processes for the time management, which have actually been implemented for JRTR, are presented. In JRTR, a master schedule was submitted in December 2012 whereas the project was contracted in October 2010. The schedule includes fixing the Engineering Deliverable List (EDL), the list of equipment, the actual issue date, the results of Primavera, a piece of software to manage progress, the progress rate and the issuance of the schedule based on the Project level III. Afterwards JAEC approved to the extension of the schedule from 56 months to 70.5 months mainly due to late preparation of the Jordanian nuclear legislative system. The project schedule was updated up to the fifth revision to compensate the delay by recovering measures such as for design, purchase, construction, and finally the owner of the project, Jordanian Atomic Energy Commission (JAEC) approved in August 2014. Construction work, the prerequisite for commissioning stage A had been finished in February 2016, and commissioning stage A has been being performed.
Review of Time Management for the Research Reactor Project
International Nuclear Information System (INIS)
Park, Kook-Nam; Park, Su-Jin; Choi, Min-Ho; Yoon, Hyung-Mo; Kim, Hyeonil; Lee, Eung-Jae
2016-01-01
In this paper, the processes for the time management, which have actually been implemented for JRTR, are presented. In JRTR, a master schedule was submitted in December 2012 whereas the project was contracted in October 2010. The schedule includes fixing the Engineering Deliverable List (EDL), the list of equipment, the actual issue date, the results of Primavera, a piece of software to manage progress, the progress rate and the issuance of the schedule based on the Project level III. Afterwards JAEC approved to the extension of the schedule from 56 months to 70.5 months mainly due to late preparation of the Jordanian nuclear legislative system. The project schedule was updated up to the fifth revision to compensate the delay by recovering measures such as for design, purchase, construction, and finally the owner of the project, Jordanian Atomic Energy Commission (JAEC) approved in August 2014. Construction work, the prerequisite for commissioning stage A had been finished in February 2016, and commissioning stage A has been being performed
Energy Technology Data Exchange (ETDEWEB)
Rasmussen, T.M.; Thorning, L.
2012-09-15
Project ALTKUL was commissioned by DONG E and P A/S and Nordsoefonden; the Danish Energy Agency followed the project closely. The starting point of the study was the need in Danish onshore areas for more knowledge on alternative methods that could be used for hydrocarbon exploration, as an alternative to seismic investigations. DONG E and P A/S and Nordsoefonden approached GEUS, suggesting a study of seven different methods. The Danish Energy Agency was interested in the subject and requested that an actual test of a method be carried out as a part of the project. The seven methods considered and reviewed are: 1: Surface geochemistry; 2: Gravimetric modelling; 3: Magnetotellurics (MT, AMT and ZTEM); 4: High-Moment Electromagnetics (HMEM); 5: High-Powered Spectral Induced Polarization (HPSIP); 6: Electron Para-magnetic Resonance (EPR); 7: Airborne Transient Pulse Surveys. Getting a test of one of the methods based on electromagnetic theory organised caused some difficulties. An experiment with a galvanic controlled source was considered to be the optimum choice. However, based on various contacts and failed attempts to organise a test, a contract was entered with Uppsala University for some initial tests of the MT method. The test is to be carried out in August 2012 and will be reported in a separate report (ALTKUL Project Report Part 2). (LN)
Child injuries in Ethiopia: A review of the current situation with projections.
Li, Qingfeng; Alonge, Olakunle; Lawhorn, Collene; Ambaw, Yirga; Kumar, Smita; Jacobs, Troy; Hyder, Adnan A
2018-01-01
Heavy burden of child injuries and lack of policy response in Ethiopia call for an improved understanding of the situation and development of action plans from multiple governmental agencies and stakeholders. A consortium of international and Ethiopian researchers and stakeholders used extensive literature review and mixed analytical methods to estimate and project the burden of fatal and non-fatal child unintentional injuries in Ethiopia from 2015 to 2030. Estimates were derived for children aged 0-14 years. Data sources include a longitudinal study conducted by the Central Statistics Agency of Ethiopia and the World Bank as well as model-based estimates from World Health Organization 2017 and Global Burden of Disease 2016 project. Injuries caused about 25 thousand deaths among 0-14-year olds in Ethiopia in 2015. The leading cause of fatal child unintentional injuries in Ethiopia was road-traffic injuries, followed by fire, heat and hot substances and drowning. The death rate due to injuries among 0-14 years olds was about 50 percent higher in males than females. Rural children were exposed to a greater risk of injury than their urban peers. The longitudinal survey suggests that the incidence rate of child injuries increased during the period 2011-2014. The annual mortality caused by injuries is projected to increase from 10,697 in 2015 to 11,279 in 2020 and 11,989 in 2030 among children under 5 years, an increase of 12 percentage points in 15 years. The number of deaths among 0-14-year olds will be 26,463, 27,807, and 30,364 respectively in 2015, 2020, and 2030. As the first multisectoral collaboration on child injuries in Ethiopia, this study identified gaps in understanding of the burden of child injuries in Ethiopia. In consultation with Ethiopian government and other stakeholders, we propose starting an injury surveillance system at health clinics and hospitals and building an intervention package based on existing platforms.
Swedish encapsulation station review
Energy Technology Data Exchange (ETDEWEB)
Andersson, Sven Olof; Brunzell, P.; Heibel, R.; McCarthy, J.; Pennington, C.; Rusch, C.; Varley, G. [NAC International, Zuerich (Switzerland)
1998-06-01
In the Encapsulation Station (ES) Review performed by NAC International, a number of different areas have been studied. The main objectives with the review have been to: Perform an independent review of the cost estimates for the ES presented in SKB`s document `Plan 1996`. This has been made through comparisons between the ES and BNFL`s Waste Encapsulation Plant (WEP) at Sellafield as well as with the CLAB facility. Review the location of the ES (at the CLAB site or at the final repository) and its interaction with other parts of the Swedish system for spent fuel management. Review the logistics and plant capacity of the ES. Identify important safety aspects of the ES as a basis for future licensing activities. Based on NAC International`s experience of casks for transport and storage of spent fuel, review the basic design of the copper/steel canister and the transport cask. This review insides design, manufacturing, handling and licensing aspects. Perform an overall comparison between the ES project and the CLAB project with the objective to identify major project risks and discuss their mitigation 19 refs, 9 figs, 35 tabs
Geothermal Induced Seismicity National Environmental Policy Act Review
Energy Technology Data Exchange (ETDEWEB)
Levine, Aaron L [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Cook, Jeffrey J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Beckers, Koenraad J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Young, Katherine R [National Renewable Energy Laboratory (NREL), Golden, CO (United States)
2017-10-04
In 2016, the U.S. Bureau of Land Management (BLM) contracted with the National Renewable Energy Laboratory (NREL) to assist the BLM in developing and building upon tools to better understand and evaluate induced seismicity caused by geothermal projects. This review of NEPA documents for four geothermal injection or EGS projects reveals the variety of approaches to analyzing and mitigating induced seismicity. With the exception of the Geysers, where induced seismicity has been observed and monitored for an extended period of time due to large volumes of water being piped in to recharge the hydrothermal reservoir, induced seismicity caused by geothermal projects is a relative new area of study. As this review highlights, determining the level of mitigation required for induced seismic events has varied based on project location, when the review took place, whether the project utilized the International Energy Agency or DOE IS protocols, and the federal agency conducting the review. While the NEPA reviews were relatively consistent for seismic monitoring and historical evaluation of seismic events near the project location, the requirements for public outreach and mitigation for induced seismic events once stimulation has begun varied considerably between the four projects. Not all of the projects were required to notify specific community groups or local government entities before beginning the project, and only one of the reviews specifically stated the project proponent would hold meetings with the public to answer questions or address concerns.
Photovoltaic demonstration projects
Energy Technology Data Exchange (ETDEWEB)
Kaut, W [Commission of the European Communities, Brussels (Belgium); Gillett, W B; Hacker, R J [Halcrow Gilbert Associates Ltd., Swindon (GB)
1992-12-31
This publication, comprising the proceedings of the fifth contractor`s meeting organized by the Commission of the European Communities, Directorate-General for Energy, provides an overview of the photovoltaic demonstration projects which have been supported in the framework of the energy demonstration programme since 1983. It includes reports by each of the contractors who submitted proposals in 1987 and 1988, describing progress within their projects. Projects accepted from earlier calls for proposals and not yet completed were reviewed by a rapporteur and are discussed in the summary section. The results of the performance monitoring of all projects and the lessons drawn from the practical experience of the projects are also presented in the summaries and conclusions. Contractors whose projects were submitted in 1989 were also present at the meeting and contributed to the reported discussions. This proceeding is divided into four sessions (General, Housing, technical presentations, other applications) and 24 papers are offered.
Project specific quality assurance plan for Project W-178, 219-S secondary containment
International Nuclear Information System (INIS)
Buckles, D.I.
1994-01-01
The scope of this Quality Assurance Program Plan (QAPP) is to provide a system of Quality Assurance reviews and verifications on the design, procurement and construction of the 219-S Secondary Containment Upgrade. The reviews and verifications will be on activities associated with design, procurement, and construction of the Secondary Containment Upgrade which includes, but is not limited to demolition, removal, new tank installation, tank 103 isolation, tank cell refurbishment, electrical, instrumentation, piping/tubing including supports, pump and valves, and special coatings. The full project scope is defined in the project Functional Design Criteria (FDC), SD-W178-FDC-001, and all activities must be in compliance with this FDC and related design documentation
Competitiveness Improvement Project Informational Workshop
Energy Technology Data Exchange (ETDEWEB)
Sinclair, Karin C [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Preus, Robert W [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Dana, Scott [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Van Dam, Jeroen J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Damiani, Rick R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jackson, Kyndall R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Baring-Gould, Edward I [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jain, Anant [Intertek
2018-02-27
This presentation was given at the Competitiveness Improvement Project (CIP) Informational Workshop on December 6, 2017. Topics covered during the workshop include an overview of the CIP, past projects, scoring criteria, technical support opportunities, certification body requirements, standards applicable to distributed wind generators, information on the National Electric Code, certification testing requirements, test site requirements, National Environmental Policy Act, design review, levelized cost of energy, procurement/contracting, project management/deliverables, and outreach materials.
International Nuclear Information System (INIS)
Shobu, Nobuhiro; Amazawa, Hiroya; Koibuchi, Hiroto; Nakata, Hisakazu; Kato, Masatoshi; Takao, Tomoe; Terashima, Daisuke; Tanaka, Yoshie; Shirasu, Hisanori
2013-12-01
Japan Atomic Energy Agency (hereafter abbreviated as “JAEA”) has promoted near surface disposal project for low-level radioactive wastes generated from research, industrial and medical facilities after receiving project approval from the government in November 2009. JAEA has carried out public information about low-level radioactive wastes disposal project on the web site. When some town meetings are held toward mutual understanding with the public, more detailed and clear explanations for safety management of near surface disposal are needed especially. Therefore, the information provision method to make the public understand should be reviewed. Moreover, a web-based survey should be carried out in order to get a sense of what the public knows, what it values and where it stands on nuclear energy and radiation issues, because the social environment surrounding nuclear energy and radiation issues has drastically changed as a result of the accident at the Fukushima Daiichi Nuclear Power Station on March 11, 2011. This review clarified the points to keep in mind about public information on near surface disposal project for low-level radioactive wastes generated from research, industrial and medical facilities, and that public awareness and understanding toward nuclear energy and radiation was changed before and after the accident at Fukushima Daiichi Nuclear Power Plant. (author)
Historical methane hydrate project review
Collett, Timothy; Bahk, Jang-Jun; Frye, Matt; Goldberg, Dave; Husebo, Jarle; Koh, Carolyn; Malone, Mitch; Shipp, Craig; Torres, Marta
2013-01-01
effort, the U.S. Congress enacted Public Law 106-‐193, the Methane Hydrate Research and Development Act of 2000. This Act called for the Secretary of Energy to begin a methane hydrate research and development program in consultation with other U.S. federal agencies. At the same time a new methane hydrate research program had been launched in Japan by the Ministry of International Trade and Industry to develop plans for a methane hydrate exploratory drilling project in the Nankai Trough. Since this early start we have seen other countries including India, China, Canada, and the Republic of Korea establish large gas hydrate research and development programs. These national led efforts have also included the investment in a long list of important scientific research drilling expeditions and production test studies that have provided a wealth of information on the occurrence of methane hydrate in nature. The most notable expeditions and projects have including the following:-‐Ocean Drilling Program Leg 164 (1995)-‐Japan Nankai Trough Project (1999-‐2000)-‐Ocean Drilling Program Leg 204 (2004)-‐Japan Tokai-‐oki to Kumano-‐nada Project (2004)-‐Gulf of Mexico JIP Leg I (2005)-‐Integrated Ocean Drilling Program Expedition 311 (2005)-‐Malaysia Gumusut-‐Kakap Project (2006)-‐India NGHP Expedition 01 (2006)-‐China GMGS Expedition 01 (2007)-‐Republic of Korea UBGH Expedition 01 (2007)-‐Gulf of Mexico JIP Leg II (2009)-‐Republic of Korea UBGH Expedition 02 (2010)-‐MH-‐21 Nankai Trough Pre-‐Production Expedition (2012-‐2013)-‐Mallik Gas Hydrate Testing Projects (1998/2002/2007-‐2008)-‐Alaska Mount Elbert Stratigraphic Test Well (2007)-‐Alaska Iġnik Sikumi Methane Hydrate Production Test Well (2011-‐2012)Research coring and seismic programs carried out by the Ocean Drilling Program (ODP) and Integrated Ocean Drilling Program (IODP), starting with the ODP Leg 164 drilling of the
Fitting the project into the environment : Gulf Heavy Oil Red Cross Projects
International Nuclear Information System (INIS)
Sakires, D.G.; Johannesen, D.V.
1998-01-01
A reservoir delineation project by Gulf Canada's Heavy Oil Division was reviewed. The six well drilling program was completed in 1997 with minimal negative environmental impacts. The program, dubbed the Red Cross project, took place in the Northern Boreal Forest of Saskatchewan. Its success is attributed to the early involvement of the regulatory agencies in Saskatchewan, on-site environmental investigations, the development of an environmental protection plan, conscientious construction practices, a monitoring program during construction, and a pro-active reclamation plan. The project area is identified as being environmentally sensitive and important as a wildlife habitat area. This successful project demonstrated the usefulness of pre-project planning and team work between industry and the regulators. Details of the planning, construction and planned remedial reclamation actions are described. 11 refs., 2 tabs
Energy Technology Data Exchange (ETDEWEB)
Petrunik, K. [Emirates Nuclear Energy Corp., Abu Dhabi (United Arab Emirates)
2014-07-01
This paper reviews the Barakah Project in United Arab Emirates (UAE). Development of UAE nuclear power plant programme is proceeding and construction is well under way. Nuclear energy is a compelling solution to energy demand in the UAE. Economics, environment, energy security, diversification and industrial development are the key drivers of this program. The project continues ro meet construction milestones, capacity building and training on UAE Nationals.
International Nuclear Information System (INIS)
Rose, J.B.
1981-01-01
This case study assesses the industrial relations impact of the construction of the Bruce Nuclear Power Development. It examines the labour relations system in the Ontario electric power sector and in major building construction. Industrial relations problems and practices at the Bruce project are reviewed. The focus of the study is on the relationship between the project and the rest of the Ontario industrial construction industry
MANAGING MULTICULTURAL PROJECT TEAMS
Directory of Open Access Journals (Sweden)
Cezar SCARLAT
2014-06-01
Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.
USEPAM Project: The State of Progress
DEFF Research Database (Denmark)
Lund, Søren
The paper represents the introductory speech at the 2nd regional workshop of the USEPAM project in Phnom Penh March 2005. It gives a review of the project's activities and achievements, and an introduction to the objectives, structure and programme of the workshop...
National Research Council Canada - National Science Library
Heitmuller, Franklin T; Asquith, William H; Fang, Xing; Thompson, David B; Wang, Keh-Han
2005-01-01
A review of the literature addressing sediment transport in gravel-bed river systems and structures designed to control bed-load mobility is provided as part of Texas Department of Transportation research project 0-4695...
7 CFR 550.32 - Project supervision and responsibilities.
2010-01-01
... Management of Agreements Program Management § 550.32 Project supervision and responsibilities. (a) The... with a project plan for use for external peer review. ... 7 Agriculture 6 2010-01-01 2010-01-01 false Project supervision and responsibilities. 550.32...
Energy Technology Data Exchange (ETDEWEB)
NONE
2001-04-01
The Federal Court noted four deficiencies in the joint EUB-CEAA environmental review dated September 12, 2000 for the Cheviot Coal Project. The Joint Review Panel reconvened to hear additional evidence about these deficiencies. This memorandum to cabinet comprises the Government of Canada's response to the additional evidence. Some of the Panel's recommendations are accepted. Comments are included regarding migratory birds, protection of traditional aboriginal sites, economic benefits, grizzly bears, and fish habitat.
Major projects for the use of high power linacs
International Nuclear Information System (INIS)
Prome, M.
1996-01-01
A review of the major projects for high power linacs is given. The field covers the projects aiming at the transmutation of nuclear waste or the production of tritium, as well as the production of neutrons for hybrid reactors or basic research with neutron sources. The technologies which arc common to all the projects are discussed. Comments are made on the technical difficulties encountered by all the projects, and the special problems of the pulsed linacs are mentioned. Elements for a comparison of normal conducting linacs versus superconducting ones are given. Finally the technical developments being made in various laboratories are reviewed. (author)
TERMINOLOGY MANAGEMENT FRAMEWORK DEVIATIONS IN PROJECTS
Directory of Open Access Journals (Sweden)
Олена Борисівна ДАНЧЕНКО
2015-05-01
Full Text Available The article reviews new approaches to managing projects deviations (risks, changes, problems. By offering integrated control these parameters of the project and by analogy with medical terminological systems building a new system for managing terminological variations in the projects. With an improved method of triads system definitions are analyzed medical terms that make up terminological basis. Using the method of analogy proposed new definitions for managing deviations in projects. By using triad integrity built a new system triad in project management, which will subsequently also analogous to develop a new methodology of deviations in projects.
Managing Challenges in a Multi Contractor Project
King, Ron
2011-01-01
The presentation provides a project description, describes the integrated product team, and review project challenges. The challenges include programmatic, technical, basic drop tests, heavy drop tests, C-17 envelope expansion, and Ares I-X.
Clean air and project financing
International Nuclear Information System (INIS)
Zimmer, M.J.
1992-01-01
This article examines how environmental requirements are challenging the developers ability to secure financing for independent energy projects. The topics addressed in the article include a review of the US Environmental Protection Agency auction rules for acid rain emission allowances, short term and long term market demand, project financing issues, credit value and matching interests
David W. Peterson; Becky K. Kerns; Erich Kyle Dodson
2014-01-01
The purpose of this study was to review scientifi c knowledge and model projections on vegetation vulnerability to climatic and other environmental changes in the Pacifi c Northwest, with emphasis on fi ve major biome types: subalpine forests and alpine meadows, maritime coniferous forests, dry coniferous forests, savannas and woodlands (oak and juniper), and interior...
Ranking the Project Management Success Factors for Construction Project in South India
Aneesha, K.; Haridharan, M. K.
2017-07-01
In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.
A Study of Technical Engineering Peer Reviews at NASA
Chao, Lawrence P.; Tumer, Irem Y.; Bell, David G.
2003-01-01
This report describes the state of practices of design reviews at NASA and research into what can be done to improve peer review practices. There are many types of reviews at NASA: required and not, formalized and informal, programmatic and technical. Standing project formal reviews such as the Preliminary Design Review and Critical Design Review are a required part of every project and mission development. However, the technical, engineering peer reviews that support teams' work on such projects are informal, some times ad hoc, and inconsistent across the organization. The goal of this work is to identify best practices and lessons learned from NASA's experience, supported by academic research and methodologies to ultimately improve the process. This research has determined that the organization, composition, scope, and approach of the reviews impact their success. Failure Modes and Effects Analysis (FMEA) can identify key areas of concern before or in the reviews. Product definition tools like the Project Priority Matrix, engineering-focused Customer Value Chain Analysis (CVCA), and project or system-based Quality Function Deployment (QFD) help prioritize resources in reviews. The use of information technology and structured design methodologies can strengthen the engineering peer review process to help NASA work towards error-proofing the design process.
Zhang, L.; Li, Y.; Wu, Q.
2013-05-01
Integrated Project Delivery (IPD) is a newly-developed project delivery approach for construction projects, and the level of collaboration of project management team is crucial to the success of its implementation. Existing research has shown that collaborative satisfaction is one of the key indicators of team collaboration. By reviewing the literature on team collaborative satisfaction and taking into consideration the characteristics of IPD projects, this paper summarizes the factors that influence collaborative satisfaction of IPD project management team. Based on these factors, this research develops a fuzzy linguistic method to effectively evaluate the level of team collaborative satisfaction, in which the authors adopted the 2-tuple linguistic variables and 2-tuple linguistic hybrid average operators to enhance the objectivity and accuracy of the evaluation. The paper demonstrates the practicality and effectiveness of the method through carrying out a case study with the method.
Tanks Focus Area midyear review report FY00
International Nuclear Information System (INIS)
Roeder-Smith, R.D.
2000-01-01
In accordance with EM's office of Science and Technology (OST), the TFA is committed to assessing the maturity of technology development projects and ensuring their readiness for implementation and subsequent deployment. The TFA conducts an annual Midyear Review to document the status of ongoing projects, reaffirm and document user commitment to selected projects, and to improve the effective deployment of technology by determining and documenting the readiness of selected projects to move ahead. Since 1995, OST has used a linear technology maturation model that spans through seven defined stages of maturity, from basic research to implementation. Application of this Stage/Gate model to technology development resulted in prescriptive and somewhat cumbersome review procedures, resulting in limited and inconsistent use. Subsequently, in February 2000, OST issued revised guidance in an effort to streamline the technology tracking and review process. While the new OST guidance reinforces peer review requirements and the use of the American Society of Mechanical Engineers (ASME) for independent reviews, it also implements a simplified Gate model. The TFA is now responsible for providing auditable documentation for passing only three stages of technology maturity: ready for research (Gate 0); ready for development (Gate 2); ready for demonstration (Gate 5). The TFA Midyear Review is a key element in the overall review procedure, as the tracking evidence for all active projects is required to be available at this time. While the Midyear Report contains an overview of the status of all TFA reviews and projects, not all the reviews were conducted during the Midyear Review. The TFA used a phased approach to accomplish the Midyear Review requirements
Energy Technology Data Exchange (ETDEWEB)
Choi, Heui Joo; Choi, Jong Won; Lee, Jong Youl; Jung, Jong Tae; Kim, Sung Ki; Lee, Min Soo; Cho, Dong Keun; Kook, Dong Hak
2008-11-15
High level radioactive waste disposal system project for advanced nuclear fuel cycle produced this report which are dealing with the repository status of proceding countries as of 2008. This report has brief review on disposal facilities which are operating and will be operating and on future plan of those nations. The other report 'Development of the Geological Disposal System for High Level Waste' which was produced like this report time and this report would help the readers grasp the current repository status. Because our country is a latecomer in the HLW disposal world, it is strongly recommended to catch up with advanced disposal system and concepts of developed nations and this report is expected to make it possible. There are several nations which were the main survey target; Finland, USA, Sweden, Germany, France, Switzerland, and Japan. Recent information was applied to this report and our project team will produce annual state-of-the-art report with continuous updates.
International Nuclear Information System (INIS)
1994-01-01
On May 26, 1994, the Lake County Sanitation District and the US Bureau of Land Management released for public review a Draft Environmental Impact Report/Environmental Impact Statement (EIR/EIS) on the proposed Southeast Regional Wastewater Treatment Plant Facilities Improvements Project and Geysers Effluent Pipeline Project. A minimum 45-day review and comment period began on that date and notices were published in the Federal Register. The public review and comment period closed on July 26, 1994. Public hearings on the Draft EIMIS were held in Lakeport, CA, on June 30 and July 14, 1994. The first part of this document contains copies of the written comments submitted on the Draft EIR/EIS. It also contains summary paraphrased comments of the public hearings. The second part of this document contains responses to the comments
Project management for profit a failsafe guide to keeping projects on track and on budget
Knight, Joe; Angus, Brad; Case, John
2012-01-01
If your work involves projects, then this book is for you. It will show every company owner and project manager—at businesses large and small—how to run projects differently. You’ll benefit if you’ve ever: • been over budget on a project • exceeded a timeline on a project • worked on a project that completely stalled as you neared the finish line • lost money on a sure-thing project and had no idea why • noticed that scope and feature creep held you back • watched a project take three times as long as planned • felt too embarrassed to perform a review of your successes and failures • wondered whether your project actually made any money By the time you finish the book, you’ll be ready to implement Project Management for Profit in your own company—and be prepared to keep your projects on track and on budget.
International Nuclear Information System (INIS)
2017-07-01
The French Nuclear Safety Authority (Autorité de sûreté nucléaire, ASN) is preparing the evaluation of a licence application for the creation of a deep geological disposal facility in 2018, called Cigéo, for intermediate level, high level and long lived radioactive waste. This licence is preceded by the submission of a Safety Options Dossier to ASN, which provides the French National Radioactive Waste Management Agency (Agence nationale pour la gestion des déchets radioactifs, Andra) the possibility to receive advice from ASN on the preparation of the licence application on the safety principles and approach. The Safety Options Dossier sets out the chosen objectives, concepts and principles for ensuring the safety of the facility. ASN requested the IAEA to organize an international peer review of the Safety Options Dossier. This publication presents the consensus view of the international group of experts convened by the IAEA to conduct the review against the relevant IAEA safety standards and proven international practice and experience. The experts acted in a personal capacity and the views expressed do not necessarily reflect those of the IAEA, the governments of the nominating Member States or the nominating organizations. The basis of this peer review is the set of documents provided by Andra, as the agency responsible for the development of the Cigéo project and for its safety. Consequently, the findings of the reviews are addressed directly to Andra. This publication, however, is primarily submitted to ASN to review the outcomes of the Andra project.
A study on strategies for effective participation in the IAEA/RCA projects
International Nuclear Information System (INIS)
Chung, Joon Keuk; Jun, Byung Jin; Lee, Man Ki; Jin, Joon Ha; Choi, Pyung Hoon; Kim, Myung Ro; Min, Do Young
2002-07-01
In an effort to achieve the objectives, the following provisions were made. First of all, how this project supported RCA events that were held in Korea during the project period was described. Also, participation in RCA major policy level meetings, RCA-30 Scientific Forum, RCA Regional Office Opening were briefly reviewed. Secondly, RCA's general features including history and objective of its establishment, basic policy, administrative structure, major meetings was also reviewed. Thirdly, Overview of RCA projects, project implementation mechanism, on-going and planned project, review of technology utilization so fat and success stories were described. Fourthly, the issues related to the effective RCA management such as lead countries, Regional Resources Units (RRUs), RCA future vision and outsourcing of technical cooperation projects were reviewed. Finally, proper strategies and recommendations for active implementation of RCA projects were presented. This study can be utilized as basic reference material in the efficient implementation of RCA programmes in the future and for the personnel involved in the RCA projects as the fundamental elements for implementing the RCA cooperation are presented. The effective implementation direction for RCA programmes and strategies for strengthening Korea's participation in RCA projects can be utilized as basic reference material for the effective planning and implementation of RCA projects. It is hoped that this study will be widely utilized for expanding Korea's participation in the RCA project and for establishing a future direction for RCA projects by the governments, industries, academic circles and research institutions
Gamification in Software Development Projects
Directory of Open Access Journals (Sweden)
Platonova Valērija
2017-12-01
Full Text Available Gamification is one of the many ways to motivate employees and introduce more fun in daily activities. The aim of the paper is to analyse the impact of gamification method on the software development projects. The paper contains results of a literature review about application areas of gamification, methods, positive and negative effects on projects. The paper also presents an overview of the gamification tools used in software development projects and attempts to answer the question about benefits of gamification usage: whether gamification in the project leads to the desired results and increases the employee productivity and motivation.
Peer Assessment in Engineering Group Projects
DEFF Research Database (Denmark)
Triantafyllou, Eva; Timcenko, Olga
2014-01-01
Peer review has proved to be beneficial in project-based environments by involving students in the process and encouraging them to take ownership of their learning. This article reviews how peer assessment has been employed within group work for different engineering programs. Since the administr...
Childs, Sue; Blenkinsopp, Elizabeth; Hall, Amanda; Walton, Graham
2005-12-01
In 2003/4 the Information Management Research Institute, Northumbria University, conducted a research project to identify the barriers to e-learning for health professionals and students. The project also established possible ways to overcome these barriers. The North of England Workforce Development Confederation funded the project. The project comprised a systematic review of the literature on barriers to and solutions/critical success factors for e-learning in the health field. Fifty-seven references were suitable for analysis. This review was supplemented by a questionnaire survey of learners and an interview study of learning providers to ensure that data identified from the literature were grounded in reality. The main barriers are: requirement for change; costs; poorly designed packages; inadequate technology; lack of skills; need for a component of face-to-face teaching; time intensive nature of e-learning; computer anxiety. A range of solutions can solve these barriers. The main solutions are: standardization; strategies; funding; integration of e-learning into the curriculum; blended teaching; user friendly packages; access to technology; skills training; support; employers paying e-learning costs; dedicated work time for e-learning. The authors argue that librarians can play an important role in e-learning: providing support and support materials; teaching information skills; managing and providing access to online information resources; producing their own e-learning packages; assisting in the development of other packages.
Annual review of research projects 1985
International Nuclear Information System (INIS)
Keam, D.W.
1987-04-01
This progress report provides a brief outline of current Laboratory research and development projects and their present status. The material has been grouped into the following fields: uranium, radon and its daughters; radiation effects in solids and gases; x-rays and clinical dosimetry, measurement standards in radiation dosimetry; radiopharmaceuticals and nuclear medicine; non-ionising electromagnetic radiation; environmental radiochemistry and radiation monitoring. The last category includes residual radioactive contamination at Maralinga, Emu and the Monte Bello Islands from British nuclear weapons tests in Australia, and the public health impact of fall-out from those tests
Focusing Information Systems Post-Graduate Research Projects
Directory of Open Access Journals (Sweden)
Gail Ridley
1996-11-01
Full Text Available This paper reports on an investigation of mechanisms that assist Information Systems post-graduate research students to focus their projects. An evaluation is presented of the experiences of Information Systems research students in focussing their research projects based on a survey conducted of students who participated in two of the first three Information Systems doctoral consortia to be held in Australia. The survey sought to determine whether a doctoral consortium or 'systematic expert review' is the most valuable mechanism for focussing a research proposal. Systematic expert review was considered by the students to be more effective than the doctoral consortium process for the purpose of focussing their research project proposals.
Squaring the Project Management Circle: Updating the Cost, Schedule, and Performance Methodology
2016-04-30
MIT Sloan Management Review . MIT Sloan Management Review . Retrieved from http://sloanreview.mit.edu/article/the-new-industrial-engineering-information-technology-and- business-process-redesign/ ...critical variable that must be addressed by project managers . The research methodology consists of a system-focused approach based on an extensive review ...doi.org/10.1016/j.ijproman.2007.01.004 Baccarini, D. (1996). The concept of project complexity–A review .
International Nuclear Information System (INIS)
1999-01-01
In June 1998, a joint review panel released a report on a dam and diversion project proposed by Alberta Public Works, Supply and Services. This document is the response to that report addressing its recommendations to the federal government and other recommendations or statements pertinent to federal areas of jurisdiction and interest. It begins with background on the proposed project, then presents the report's recommendations or statements along with the federal responses with regard to the following issue areas: Regulatory approval; navigable waters and the public right of navigation; fish and fish habitat; wetlands and wildlife; and Aboriginal concerns
Flat-plate solar array project. Volume 8: Project analysis and integration
Mcguire, P.; Henry, P.
1986-01-01
Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.
2013 Geothermal Technologies Office Peer Review Report
Energy Technology Data Exchange (ETDEWEB)
Geothermal Technologies Office
2014-01-01
Geothermal Technologies Office conducted its annual program peer review in April of 2013. The review provided an independent, expert evaluation of the technical progress and merit of GTO-funded projects. Further, the review was a forum for feedback and recommendations on future GTO strategic planning. During the course of the peer review, DOE-funded projects were evaluated for 1) their contribution to the mission and goals of the GTO and 2) their progress against stated project objectives. Principal Investigators (PIs) came together in sessions organized by topic “tracks” to disseminate information, progress, and results to a panel of independent experts as well as attendees.
Progress with the NESC spinning cylinder project and other NESC projects
International Nuclear Information System (INIS)
Wintle, J.B.; Hurst, R.C.; Hemsworth, B.
1995-01-01
The first international project (NESC I) of the Network of Evaluating Steel Components is a spinning cylinder, pressurized thermal shock (PTS) experiment. The main objective of the project is to validate the non-destructive evaluation and structural mechanics procedures for PWR reactor pressure vessels under PTS conditions. Contributing organizations world-wide will participate in this blind trial which embraces all aspects of structural integrity assessment. This paper describes the progress of the project to date, covering cylinder manufacture and inspection, materials evaluation, structural analysis and test instrumentation. It emphasizes the importance of networking global expertise in a managed framework and of the partnership, co-operation and teamwork developed by the contributing organizations through the five Task Groups constituting the NESC I. Finally, five new initiatives for projects managed by the Network are currently under review and described in this paper
Masiello, Italo
2009-09-01
The constellation of an EU-funded project-consortium is often of very disparate culture, languages, level of knowledge and technology, social competences, experiences, ideals and ambitions that may clash with one another. Hence, coordinating and managing successful European joint projects is not an easy task. This paper addresses the learning experience of managing international research projects and, through the author's own experience and literature review, attempts to exemplify the role of the flow-keeper--a modern project manager whose particular skills are to ensure the success of EU joint projects of considerable complexity. Propositions for developing the management of international joint projects are also provided.
REVIEW ON CONSTRUCTION PROJECT MANAGEMENT SOFTWARE PRIMAVERA P6
Piyush Pramod Bagade* & Prof. Abhijit Bhirud
2018-01-01
Planning, scheduling and Resource levelling plays an important role in any construction project maybe it is construction of building or construction of road. In absence of proper planning, scheduling and resource levelling construction industry does not get profit over the project. For this purpose, proper software’s and techniques must be utilize. This paper is focussing on the advantages of Oracle Primavera P6 Software. The latest version of Primavera is P6-17. In any construction work huge...
SpaceScience@Home: Authentic Research Projects that Use Citizen Scientists
Méndez, B. J. H.
2008-06-01
In recent years, several space science research projects have enlisted the help of large numbers of non-professional volunteers, ``citizen scientists'', to aid in performing tasks that are critical to a project, but require more person-time (or computing time) than a small professional research team can practically perform themselves. Examples of such projects include SETI@home, which uses time from volunteers computers to process radio-telescope observation looking for signals originating from extra-terrestrial intelligences; Clickworkers, which asks volunteers to review images of the surface of Mars to identify craters; Spacewatch, which used volunteers to review astronomical telescopic images of the sky to identify streaks made by possible Near Earth Asteroids; and Stardust@home, which asks volunteers to review ``focus movies'' taken of the Stardust interstellar dust aerogel collector to search for possible impacts from interstellar dust particles. We shall describe these and other similar projects and discuss lessons learned from carrying out such projects, including the educational opportunities they create.
How Configuration Management Helps Projects Innovate and Communicate
Cioletti, Louis A.; Guidry, Carla F.
2009-01-01
This slide presentation reviews the concept of Configuration Management (CM) and compares it to the standard view of Project management (PM). It presents two PM models: (1) Kepner-Tregoe,, and the Deming models, describes why projects fail, and presents methods of how CM helps projects innovate and communicate.
The Savannah River Site Replacement High Level Radioactive Waste Evaporator Project
International Nuclear Information System (INIS)
Presgrove, S.B.
1992-01-01
The Replacement High Level Waste Evaporator Project was conceived in 1985 to reduce the volume of the high level radioactive waste Process of the high level waste has been accomplished up to this time using Bent Tube type evaporators and therefore, that type evaporator was selected for this project. The Title I Design of the project was 70% completed in late 1990. The Department of Energy at that time hired an independent consulting firm to perform a complete review of the project. The DOE placed a STOP ORDER on purchasing the evaporator in January 1991. Essentially, no construction was to be done on this project until all findings and concerns dealing with the type and design of the evaporator are resolved. This report addresses two aspects of the DOE design review; (1) Comparing the Bent Tube Evaporator with the Forced Circulation Evaporator, (2) The design portion of the DOE Project Review - concentrated on the mechanical design properties of the evaporator. 1 ref
On e-Government Project Development in Balmeda
Anagnostou, Miltiades E.; Lambrou, Maria A.
An e-government project management and development scenario in a fictional country is described. Emphasis is given on how local culture undermines project quality. A detailed fictional project development scenario is presented. The interplay between different players, i.e. project developers, reviewers, and public services, is illustrated. While the rules of technology are the same everywhere, local adaptation due to socio-economic factors can bend them to the degree of making them ineffective.
Energy Technology Data Exchange (ETDEWEB)
Block, S. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Cornwall, J. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Dally, W. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Dyson, F. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Fortson, N. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Joyce, G. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Kimble, H. J. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Lewis, N. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Max, C. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Prince, T. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Schwitters, R. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Weinberger, P. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Woodin, W. H. [The MITRE Corporation, McLean, VA (US). JASON Program Office
1998-01-04
The study reviews Department of Energy supported aspects of the United States Human Genome Project, the joint National Institutes of Health/Department of Energy program to characterize all human genetic material, to discover the set of human genes, and to render them accessible for further biological study. The study concentrates on issues of technology, quality assurance/control, and informatics relevant to current effort on the genome project and needs beyond it. Recommendations are presented on areas of the genome program that are of particular interest to and supported by the Department of Energy.
The Predictive Validity of Projective Measures.
Suinn, Richard M.; Oskamp, Stuart
Written for use by clinical practitioners as well as psychological researchers, this book surveys recent literature (1950-1965) on projective test validity by reviewing and critically evaluating studies which shed light on what may reliably be predicted from projective test results. Two major instruments are covered: the Rorschach and the Thematic…
Hanney, Steve; Greenhalgh, Trisha; Blatch-Jones, Amanda; Glover, Matthew; Raftery, James
2017-03-28
We sought to analyse the impacts found, and the methods used, in a series of assessments of programmes and portfolios of health research consisting of multiple projects. We analysed a sample of 36 impact studies of multi-project research programmes, selected from a wider sample of impact studies included in two narrative systematic reviews published in 2007 and 2016. We included impact studies in which the individual projects in a programme had been assessed for wider impact, especially on policy or practice, and where findings had been described in such a way that allowed them to be collated and compared. Included programmes were highly diverse in terms of location (11 different countries plus two multi-country ones), number of component projects (8 to 178), nature of the programme, research field, mode of funding, time between completion and impact assessment, methods used to assess impact, and level of impact identified. Thirty-one studies reported on policy impact, 17 on clinician behaviour or informing clinical practice, three on a combined category such as policy and clinician impact, and 12 on wider elements of impact (health gain, patient benefit, improved care or other benefits to the healthcare system). In those multi-programme projects that assessed the respective categories, the percentage of projects that reported some impact was policy 35% (range 5-100%), practice 32% (10-69%), combined category 64% (60-67%), and health gain/health services 27% (6-48%). Variations in levels of impact achieved partly reflected differences in the types of programme, levels of collaboration with users, and methods and timing of impact assessment. Most commonly, principal investigators were surveyed; some studies involved desk research and some interviews with investigators and/or stakeholders. Most studies used a conceptual framework such as the Payback Framework. One study attempted to assess the monetary value of a research programme's health gain. The widespread
Project Management in the Finnish Music Industry
Hypén, Joel
2009-01-01
The term project is a widely used phrase in today’s working life. This thesis explains what project management theory is, how it has evolved through history and how it is applied in managing modern business projects in the contexts of the Finnish music business sector. The literature review contains a description of the key phases a project is typically organised in as well as the terms and tools used to plan and run a successful project. Through qualitative research means the thesis inves...
ADVANTAGES, DISADVANTAGES, AND LESSONS LEARNED FROM MULTI-REACTOR DECOMMISSIONING PROJECTS
International Nuclear Information System (INIS)
Morton, M.R.; Nielson, R.R.; Trevino, R.A.
2003-01-01
This paper discusses the Reactor Interim Safe Storage (ISS) Project within the decommissioning projects at the Hanford Site and reviews the lessons learned from performing four large reactor decommissioning projects sequentially. The advantages and disadvantages of this multi-reactor decommissioning project are highlighted
Ji, Xiaonan; Machiraju, Raghu; Ritter, Alan; Yen, Po-Yin
2017-01-01
Systematic Reviews (SRs) of biomedical literature summarize evidence from high-quality studies to inform clinical decisions, but are time and labor intensive due to the large number of article collections. Article similarities established from textual features have been shown to assist in the identification of relevant articles, thus facilitating the article screening process efficiently. In this study, we visualized article similarities to extend its utilization in practical settings for SR researchers, aiming to promote human comprehension of article distributions and hidden patterns. To prompt an effective visualization in an interpretable, intuitive, and scalable way, we implemented a graph-based network visualization with three network sparsification approaches and a distance-based map projection via dimensionality reduction. We evaluated and compared three network sparsification approaches and the visualization types (article network vs. article map). We demonstrated the effectiveness in revealing article distribution and exhibiting clustering patterns of relevant articles with practical meanings for SRs.
TFA Tanks Focus Area midyear review report FY 2000
Energy Technology Data Exchange (ETDEWEB)
LR Roeder-Smith
2000-05-02
In accordance with EM's office of Science and Technology (OST), the TFA is committed to assessing the maturity of technology development projects and ensuring their readiness for implementation and subsequent deployment. The TFA conducts an annual Midyear Review to document the status of ongoing projects, reaffirm and document user commitment to selected projects, and to improve the effective deployment of technology by determining and documenting the readiness of selected projects to move ahead. Since 1995, OST has used a linear technology maturation model that spans through seven defined stages of maturity, from basic research to implementation. Application of this Stage/Gate model to technology development resulted in prescriptive and somewhat cumbersome review procedures, resulting in limited and inconsistent use. Subsequently, in February 2000, OST issued revised guidance in an effort to streamline the technology tracking and review process. While the new OST guidance reinforces peer review requirements and the use of the American Society of Mechanical Engineers (ASME) for independent reviews, it also implements a simplified Gate model. The TFA is now responsible for providing auditable documentation for passing only three stages of technology maturity: ready for research (Gate 0); ready for development (Gate 2); ready for demonstration (Gate 5). The TFA Midyear Review is a key element in the overall review procedure, as the tracking evidence for all active projects is required to be available at this time. While the Midyear Report contains an overview of the status of all TFA reviews and projects, not all the reviews were conducted during the Midyear Review. The TFA used a phased approach to accomplish the Midyear Review requirements.
Earth Science Capability Demonstration Project
Cobleigh, Brent
2006-01-01
A viewgraph presentation reviewing the Earth Science Capability Demonstration Project is shown. The contents include: 1) ESCD Project; 2) Available Flight Assets; 3) Ikhana Procurement; 4) GCS Layout; 5) Baseline Predator B Architecture; 6) Ikhana Architecture; 7) UAV Capability Assessment; 8) The Big Picture; 9) NASA/NOAA UAV Demo (5/05 to 9/05); 10) NASA/USFS Western States Fire Mission (8/06); and 11) Suborbital Telepresence.
UMTRA Project value engineering plan
International Nuclear Information System (INIS)
1990-06-01
The objective of value engineering (VE) on the Uranium MILL Tailings Remedial Action (UMTRA) Project is to ensure that remedial action at the UMTRA Project sites is performed to meet the US Environmental Protection Agency (EPA) standards for inactive uranium mill tailings sites at the lowest cost, while maintaining a high quality of work. Through review of designs and consideration of reasonable, less expensive alternatives, VE can be an effective cost reduction tool and a means to improve the design. The UMTRA Project products are the design and construction of stabilized tailings embankments
Progress with the NESC spinning cylinder project and other NESC projects
International Nuclear Information System (INIS)
Wintle, J.B.; Hurst, R.C.; Hemsworth, B.
1995-01-01
The first international project (NESC I) of the Network for Evaluating Steel Components is a spinning cylinder, pressurized thermal shock (PTS) experiment. The main objective of the project is to validate the non-destructive evaluation and structural mechanics procedures for PWR reactor pressure vessels under PTS conditions. Contributing organizations world-wide will participate in this blind trial which embraces all aspects of structural integrity assessment. This paper describes the progress of the project to date, covering cylinder manufacture and inspection, materials evaluation, structural analysis and test instrumentation. It emphasises the importance of networking global expertise in a managed framework and of the partnership, co-operation and teamwork developed by the contributing organizations through the five Task Groups constituting NESC I. Finally, five new initiatives for projects managed by the Network are currently under review and described in this paper. (author). 2 refs, 6 figs
The Project Method in Agricultural Education: Then and Now
Roberts, T. Grady; Harlin, Julie F.
2007-01-01
The purpose of this philosophical paper was to synthesize theoretical and historical foundations of the project method and compare them to modern best-practices. A review of historical and contemporary literature related to the project method yielded six themes: 1) purpose of projects; 2) project classification; 3) the process; 4) the context; 5)…
78 FR 26356 - Notice of Environmental Site Review
2013-05-06
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Environmental Site Review York Haven Power Company, LLC Project No. 1888-030. Exelon Generation Company, LLC Project No. 405-106. Exelon Generation Company, LLC Project No. 2355-018. On May 21, 22, and 23, 2013, Commission staff will hold an environmental site review for the...
DEFF Research Database (Denmark)
Petersen, Rikke Agnete
There is a need to better prepare nursing and other caring professionals for compassionate and culturally competent care. The IENE4 project aims to adress this need. The authors conducted an review of literature pertaining to three aspects, i.e. universal components of compassion; measuring...... compassion; and learning culturally competent compassion....
Adding Shareholder Value through Project Performance Measurement, Monitoring & Control
M.M. Akalu; J.R. Turner (Rodney)
2002-01-01
textabstractWe present the various views and methods of measuring and controlling project performance, and factors affecting a project. The review indicates that there is a shift in the type and understanding of factors of project success or failure. However, the presence of various measurement
Dingwall, B. J.
2015-12-01
NASA's Science Mission Directorate (SMD) recognizes that suborbital carriers play a vital role in training our country's future science and technology leaders. SMD created the Undergraduate Student Instrument Project (USIP) to offer students the opportunity to design, build, and fly instruments on NASA's unique suborbital research platforms. This paper explores the projects, the impact, and the lessons learned of USIP. USIP required undergraduate teams to design, build, and fly a scientific instrument in 18 months or less. Students were required to form collaborative multidisciplinary teams to design, develop and build their instrument. Teams quickly learned that success required skills often overlooked in an academic environment. Teams quickly learned to share technical information in a clear and concise manner that could be understood by other disciplines. The aggressive schedule required team members to hold each other accountable for progress while maintaining team unity. Unanticipated problems and technical issues led students to a deeper understanding of the need for schedule and cost reserves. Students exited the program with a far deeper understanding of project management and team dynamics. Through the process of designing and building an instrument that will enable new research transforms students from textbook learners to developers of new knowledge. The initial USIP project funded 10 undergraduate teams that flew a broad range of scientific instruments on scientific balloons, sounding rockets, commercial rockets and aircraft. Students were required to prepare for and conduct the major reviews that are an integral part of systems development. Each project conducted a Preliminary Design Review, Critical Design Review and Mission Readiness review for NASA officials and flight platform providers. By preparing and presenting their designs to technical experts, the students developed a deeper understanding of the technical and programmatic project pieces that
Johnson, Michael
2015-04-01
iCubeSat, the Interplanetary CubeSat Workshop, is an annual technical workshop for researchers working on an exciting new standardised platform and opportunity for planetary and space scientists. The first workshop was held in 2012 at MIT, 2013 at Cornell, 2014 at Caltech with the 2015 workshop scheduled to take place on the 26-27th May 2015 at Imperial College London. Mission concepts and flight projects presented since 2012 have included orbiters and landers targeting asteroids, the moon, Mars, Venus, Saturn and their satellites to perform science traditionally reserved for flagship missions at a fraction of their cost. Some of the first missions proposed are currently being readied for flight in Europe, taking advantage of multiple ride share launch opportunities and technology providers. A review of these and other interplanetary CubeSat projects will be presented, covering details of their science objectives, instrument capabilities, technology, team composition, budget, funding sources, and the other programattic elements required to implement this potentially revolutionary new class of mission.
Ecological Compliance Assessment Project: 1994 Summary report
International Nuclear Information System (INIS)
Brandt, C.A.
1994-11-01
The Ecological Compliance Assessment Project (ECAP) began full operation on March 1, 1994. The project is designed around a baseline environmental data concept that includes intensive biological field surveys of key areas of the Hanford Site where the majority of Site activities occur. These surveys are conducted at biologically appropriate times of year to ensure that the data gathered are current and accurate. The data are entered into the ECAP database, which serves as a reference for the evaluation of review requests coming in to the project. This methodology provided the basis for over 90 percent of the review requests received. Field surveys conducted under ECAP are performed to document occurrence information for species of concern and to obtain habitat descriptions. There are over 200 species of concern on the Hanford Site, including plants, birds, mammals, reptiles, amphibians, fish, and invertebrates. In addition, Washington State has designated mature sagebrush-steppe habitat as a Priority Habitat meriting special protective measures. Of the projects reviewed, 17 resulted or will result in impacts to species or habitats of concern on the Hanford Site. The greatest impact has been on big sagebrush habitat. Most of the impact has been or will be within the 600 Area of the Site
2016 Building Technologies Office Peer Review Report
Energy Technology Data Exchange (ETDEWEB)
Building Technologies Office
2016-12-01
The 2016 Building Technologies Office Peer Review Report summarizes the feedback submitted by reviewers of the 67 BTO projects presented at the 2016 BTO Peer Review. The report presents an overview of the goals and activities under each technology program area, a summary of project scores for each program, and a brief analysis of general evaluation trends within each program area or its constituent subprograms.
Status of LLNL granite projects
International Nuclear Information System (INIS)
Ramspott, L.D.
1980-01-01
The status of LLNL Projects dealing with nuclear waste disposal in granitic rocks is reviewed. This review covers work done subsequent to the June 1979 Workshop on Thermomechanical Modeling for a Hardrock Waste Repository and is prepared for the July 1980 Workshop on Thermomechanical-Hydrochemical Modeling for a Hardrock Waste Repository. Topics reviewed include laboratory determination of thermal, mechanical, and transport properties of rocks at conditions simulating a deep geologic repository, and field testing at the Climax granitic stock at the USDOE Nevada Test Site
Assessment of Project Website Sustainability: Case of the Arctic EIA Project
Directory of Open Access Journals (Sweden)
Sonja H Bickford
2016-07-01
Full Text Available In many cases, temporary websites may be simple, accessible solutions for knowledge management and dissemination of information. However, such sites may become outdated as the funding ends, but yet in many cases, still publicly available through the Internet. The issue of website sustainability is a relevant topic for all organizations that have websites. Website lifecycle, knowledge management, and website sustainability issues are discussed through a theoretical-based literature review. These issues are then summarized and used as lessons learned for the case study approach of this paper. The aim is to identify a solution to address a website’s life and longevity, post project. A practical case study assessment of the issue of project website sustainability is needed to address the website’s longevity—post project—as creation is often made through temporary endeavors. Recommendations for future project websites are made as the outcomes and results of this study and are expressed in the form of suggested practices for project website sustainability in future projects.
The international marketing of professional service projects
DEFF Research Database (Denmark)
Skaates, Maria Anne; Tikkanen, Henrikki; Alajoutsijärvi, Kimmo
2003-01-01
Many types of commercial professional services are commonly sold as projects. Therefore this article draws on the project marketing literature to elucidate the international marketing of professional service projects. After an initial literature review, the project marketing milieu concept......, and representations to another national milieu with similarly well-developed norms, rules, and representations, yet that there also exist global milieux. Managerial implications concerning professional service firms' preparation for entering a foreign milieu as well as subsidiary or office establishment abroad...
Midwest Forensics Resource Center Project Summary June 2005
Energy Technology Data Exchange (ETDEWEB)
David Baldwin
2005-06-01
The mission of the MFRC Research and Development Program, is to provide technological advances in forensic science for the benefit of our regional partners as well as the forensic community at large. Key areas of forensic science need are identified through our interactions with our Midwest partners and our R&D advisory group, as well as through our participation in national meetings in forensic science. Under the sponsorship of the National Institute of Justice, the MFRC solicits proposals for the development of practical and useful technology, instrumentation, and methodology that address needs in areas related to forensic science and its application to operational crime laboratories. The MFRC facilitates proposal development by working to establish partnerships between researchers and our regional partners. The MFRC administers a peer-review of the proposals and then funds the selected projects at a cost of approximately $55,000 each, with a 12-month period of performance. The process for selection of these projects includes the following steps: (1) drafting of a call for proposals by MFRC staff, (2) review of the draft call by members of the R&D advisory committee, (3) review and approval of the call by NIJ, (4) issuance of the call to ISU, Ames Laboratory, regional partners, and research organizations, (5) receipt of proposals, (6) review of proposals by R&D advisory committee, (7) ranking and selection by MFRC staff using advisory committee reviews, with concurrence by NIJ, (8) notification of proposers, (9) receipt and review of progress reports by MFRC, (10) receipt and review of final reports by MFRC, R&D advisory committee, and NIJ. The decision to fund any specific project is based upon a peer-reviewed call-for-proposal system administered by the MFRC. The reviewers are crime laboratory specialists and scientists who are asked to rate the proposals on four criteria areas including: (1) relevance to the mission of the MFRC, (2) technical approach and
The Savannah River Site Replacement High Level Radioactive Waste Evaporator Project
International Nuclear Information System (INIS)
Brock Presgrove, S.
1992-01-01
The Replacement High Level Waste Evaporator Project was conceived in 1985 to reduce the volume of the high level radioactive waste currently stored at the DOE Savannah River Site Tank Farm. Process of the high level waste has been accomplished up to this time using Bent Tube type evaporators and therefore, that type evaporator was selected for this project. The Title I Design of the project was 70% completed in late 1990. The Department of Energy at that time hired an independent consulting firm to perform a complete review of the project. The DOE placed a STOP ORDER on purchasing the evaporator in January 1991. Essentially, no construction was to be done on the project until all findings and concerns dealing with the type and design of the evaporator are resolved. This report addresses two aspects of the DOE design review: Comparing the Bent Tube Evaporator with the Forced Circulation Evaporator; The design portion of the DOE Project Review - concentrated on the mechanical design properties of the evaporator. (author)
LHC Injectors Upgrade (LIU) Project at CERN
Shaposhnikova, Elena; Damerau, Heiko; Funken, Anne; Gilardoni, Simone; Goddard, Brennan; Hanke, Klaus; Kobzeva, Lelyzaveta; Lombardi, Alessandra; Manglunki, Django; Mataguez, Simon; Meddahi, Malika; Mikulec, Bettina; Rumolo, Giovanni; Scrivens, Richard; Vretenar, Maurizio
2016-01-01
A massive improvement program of the LHC injector chain is presently being conducted under the LIU project. For the proton chain, this includes the replacement of Linac2 with Linac4 as well as all necessary upgrades to the Proton Synchrotron Booster (PSB), the Proton Synchrotron (PS) and Super Proton Synchrotron (SPS), aimed at producing beams with the challenging High Luminosity LHC (HL-LHC) parameters. Regarding the heavy ions, plans to improve the performance of Linac3 and the Low Energy Ion Ring (LEIR) are also pursued under the general LIU program. The full LHC injection chain returned to operation after Long Shutdown 1, with extended beam studies taking place in Run 2. A general project Cost and Schedule Review also took place in March 2015, and several dedicated LIU project reviews were held to address issues awaiting pending decisions. In view of these developments, 2014 and 2015 have been key years to define a number of important aspects of the final LIU path. This paper will describe the reviewed LI...
Knowledge Model: Project Knowledge Management
DEFF Research Database (Denmark)
Durao, Frederico; Dolog, Peter; Grolin, Daniel
2009-01-01
The Knowledge model for project management serves several goals:Introducing relevant concepts of project management area for software development (Section 1). Reviewing and understanding the real case requirements from the industrial perspective. (Section 2). Giving some preliminary suggestions...... for usage in KIWI system (Sections 3). This document is intended for technological partners to understand how for example the software development concepts can be applied to a semantic wiki framework....
WHO's International EMF Project (invited paper)
International Nuclear Information System (INIS)
Repacholi, M.H.
1999-01-01
The International Electromagnetic Fields (EMF) Project assesses health and environmental effects of exposure to static and time varying electric and magnetic fields in the frequency range 0-300 GHz. The Project facilitates a coordinated international response to the concerns about possible health effects of exposure to EMF, assesses the scientific literature, identifies gaps in knowledge needing further research to improve health risk assessments and encourages focused research to fill gaps in knowledge. When the results of this research are published, they will be incorporated into WHO's Environmental Health Criteria monographs where formal health risk assessments are made on exposure to EMF. These monographs provide a database that facilitates the development of internationally acceptable standards for EMF exposure. This paper reviews the International EMF Project activities related to WHO's EMF research requirements and focuses on specific questions raised during the scientific reviews that need to be considered in future epidemiological studies. (author)
Schaefli, Bettina
2015-04-01
Hydropower is a pillar for renewable electricity production in almost all world regions. The planning horizon of major hydropower infrastructure projects stretches over several decades and consideration of evolving climatic conditions plays an ever increasing role. This review of model-based climate change impact assessments provides a synthesis of the wealth of underlying modelling assumptions, highlights the importance of local factors and attempts to identify the most urgent open questions. Based on existing case studies, it critically discusses whether current hydro-climatic modelling frameworks are likely to provide narrow enough water scenario ranges to be included into economic analyses for end-to-end climate change impact assessments including electricity market models. This will be completed with an overview of not or indirectly climate-related boundary conditions, such as economic growth, legal constraints, national subsidy frameworks or growing competition for water, which might locally largely outweigh any climate change impacts.
Szeless, B
The ATLAS internal reviews, be it the mandatory Production Readiness Reviews, the now newly installed Production Advancement Reviews, or the more and more requested different Design Reviews, have become a part of our ATLAS culture over the past years. The Activity Systems Status Overviews are, for the time being, a one in time event and should be held for each system as soon as possible to have some meaning. There seems to a consensus that the reviews have become a useful project tool for the ATLAS management but even more so for the sub-systems themselves making achievements as well as possible shortcomings visible. One other recognized byproduct is the increasing cross talk between the systems, a very important ingredient to make profit all the systems from the large collective knowledge we dispose of in ATLAS. In the last two months, the first two PARs were organized for the MDT End Caps and the TRT Barrel Modules, both part of the US contribution to the ATLAS Project. Furthermore several different design...
2017 Building Technologies Office Peer Review Report
Energy Technology Data Exchange (ETDEWEB)
None, None
2017-11-01
The 2017 Building Technologies Office Peer Review Report summarizes the feedback submitted by reviewers for the 109 Building Technologies Office (BTO) projects presented at the 2017 BTO Peer Review. The report presents an overview of the goals and activities under each technology program area, a summary of project scores for each program, and a brief analysis of general evaluation trends within each program area or its constituent subprograms.
The essential value of projects in faculty development.
Gusic, Maryellen E; Milner, Robert J; Tisdell, Elizabeth J; Taylor, Edward W; Quillen, David A; Thorndyke, Luanne E
2010-09-01
Projects--planned activities with specific goals and outcomes--have been used in faculty development programs to enhance participant learning and development. Projects have been employed most extensively in programs designed to develop faculty as educators. The authors review the literature and report the results of their 2008 study of the impact of projects within the Pennsylvania State University College of Medicine Junior Faculty Development Program, a comprehensive faculty development program. Using a mixed-methods approach, the products of project work, the academic productivity of program graduates, and the impact of projects on career development were analyzed. Faculty who achieved the most progress on their projects reported the highest number of academic products related to their project and the highest number of overall academic achievements. Faculty perceived that their project had three major effects on their professional development: production of a tangible outcome, development of a career focus, and development of relationships with mentors and peers. On the basis of these findings and a review of the literature, the authors conclude that projects are an essential element of a faculty development program. Projects provide a foundation for future academic success by enabling junior faculty to develop and hone knowledge and skills, identify a career focus and gain recognition within their community, generate scholarship, allocate time to academic work, and establish supportive relationships and collaborative networks. A list of best practices to successfully incorporate projects within faculty development programs is provided.
The Project Team: Features, Effectiveness and Leadership
Directory of Open Access Journals (Sweden)
Ramona-Elena GABREA
2017-06-01
Full Text Available The project team that is responsible for providing flexibility and innovation to this structure in order to enable organizations to remain successful (1. The very nature of the project team's work underpins a collective task much more complex than that assumed by other types of work teams. The aim of this paper is to explore the main factors that determine the project team effectiveness. The research methodology was the literature review. The main finding reveals that the organizational structure of projects and the project team should not be considered as a panacea for all problems of organizational effectiveness.
The STAR project: context, objectives and approaches
Furse, M.; Hering, D.; Moog, O.; Verdonschot, P.F.M.; Johnson, R.K.; Brabec, K.; Gritzalis, K.; Buffagni, A.; Pinto, P.; Friberg, N.; Murray-Bligh, J.; Kokes, J.; Alber, R.; Usseglio-Polatera, P.; Haase, P.; Sweeting, R.; Bis, B.; Szoszkiewicz, K.; Soszka, H.; Springe, G.; Sporka, F.; Krno, I.
2006-01-01
STAR is a European Commission Framework V project (EVK1-CT-2001-00089). The project aim is to provide practical advice and solutions with regard to many of the issues associated with the Water Framework Directive. This paper provides a context for the STAR research programme through a review of the
NREL: U.S. Life Cycle Inventory Database - About the LCI Database Project
About the LCI Database Project The U.S. Life Cycle Inventory (LCI) Database is a publicly available database that allows users to objectively review and compare analysis results that are based on similar source of critically reviewed LCI data through its LCI Database Project. NREL's High-Performance
Project-Based Learning: A Review of the Literature
Kokotsaki, Dimitra; Menzies, Victoria; Wiggins, Andy
2016-01-01
Project-based learning (PBL) is an active student-centred form of instruction which is characterised by students' autonomy, constructive investigations, goal-setting, collaboration, communication and reflection within real-world practices. It has been explored in various contexts and in different phases of schooling, from primary to higher…
Energy Technology Data Exchange (ETDEWEB)
1982-06-01
The purpose of this report is to document and summarize activities associated with Fluor's efforts on the Tri-State Synfuels Project. The proposed facility was to be coal-to-transport fuels facility located in Henderson, Kentucky. Tri-State Synfuels Company was participating in the project as a partner of the US Department of Energy per terms of a Cooperative Agreement resulting from DOE's synfuel's program solicitation. Fluor's initial work plan called for preliminary engineering and procurement services to the point of commitment for construction for a Sasol Fischer-Tropsch plant. Work proceeded as planned until October 1981 when results of alternative coal-to-methanol studies revealed the economic disadvantage of the Synthol design for US markets. A number of alternative process studies followed to determine the best process configuration. In January 1982 Tri-State officially announced a change from Synthol to a Methanol to Gasoline (MTG) design basis. Further evaluation and cost estimates for the MTG facility eventually led to the conclusion that, given the depressed economic outlook for alternative fuels development, the project should be terminated. Official announcement of cancellation was made on April 13, 1982. At the time of project cancellation, Fluor had completed significant portions of the preliminary engineering effort. Included in this report are descriptions and summaries of Fluor's work during this project. In addition location of key project data and materials is identified and status reports for each operation are presented.
A review of Environmental Impact Assessment parameters required for set up of a hydropower project
International Nuclear Information System (INIS)
Roy, Pankaj Kumar; Mazumdar, Asis
2013-01-01
Environmental Impact Assessment in general, hydro-meteorological conditions, topography, hydrology, water availability analysis of a river system, importance of hydropower and feasibility study of Environmental Impact assessment due to the construction of the hydropower plant have been discussed in this research work. The site selection is one of the major components so far the hydropower is concerned and also the minimum flow should have known to us so that the capacity of a hydropower plant can be predicted. The sustainable flow, which refers the flow is available throughout the year, has been calculated based on flow duration curve. This study highlights the environmental impact assessment particularly related to hydropower project. Here the study area a district town located in the eastern region of India on the banks of river Kosi has been considered. The historical rainfall and the river discharge data have been collected from various organizations. The stage-discharge correlation and hydrological parameters related to hydropower have been analyzed and also to discuss the review of environmental impact assessment in hydropower project. The EIA analysis can be also carried out by using fuzzy logic wherein the EIA parameters can be given different weight-age based on the various survey reports that have been carried out at different places at different time. Such analysis has also been provided below based on the various data obtained.
DEFF Research Database (Denmark)
Schroter, Sara; Groves, Trish; Højgaard, Liselotte
2010-01-01
The objectives of this research were (a) to describe the current status of grant review for biomedical projects and programmes from the perspectives of international funding organisations and grant reviewers, and (b) to explore funders' interest in developing uniform requirements for grant review...
Performance evaluation based on data from code reviews
Andrej, Sekáč
2016-01-01
Context. Modern code review tools such as Gerrit have made available great amounts of code review data from different open source projects as well as other commercial projects. Code reviews are used to keep the quality of produced source code under control but the stored data could also be used for evaluation of the software development process. Objectives. This thesis uses machine learning methods for an approximation of review expert’s performance evaluation function. Due to limitations in ...
International Nuclear Information System (INIS)
Linden, J. von
1998-01-01
It is desirable to have a uniform and competent procedure for the review of PSAs which are performed within the framework of the Periodic Safety Review of German Nuclear Power Plants. Guidelines for the review process should therefore be evaluated within task A. 1 of project SR 2096. The basis for this work is the experience and knowledge within GRS derived from PSA-related work and from several review projects as well as the German PSA Guide with its appendices. Furthermore, the review processes in the USA, Switzerland and Sweden and the Guidelines for the International Peer Review Service (IPERS Guidelines) were utilized. As a result, recommendations are given for the review process, with individual recommendations concerning the organization of the review, task allocation between the reviewers, interface problems, assessment criteria, the scope and depth of the review as well as the supporting documents. An additional result are checklists for the technical elements of the PSA, which are listed to facilicate the review work. It is not the intention of this report to work out complete review guidelines. Its aims is rather more to give recommondations and support for the review in addition to what can be derived from the existing documents that should be used for the review. The recommendations reflect the view of GRS and go beyond the statements given in the German PSA Guide (Leitfaden Probabilistische Sicherheitsanalyse /PSUe97/) in some points. (orig.) [de
Project Hanford management contract quality improvement project management plan; TOPICAL
International Nuclear Information System (INIS)
ADAMS, D.E.
1999-01-01
On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process
Experiences in the TC IAEA MEX4/058 project: RCIC Ageing Management Review
International Nuclear Information System (INIS)
Diaz, A.; Mendoza, G.; Viais, J.; Arganis, C.; Contreras, A.; Fernandez, G.; Medina, G.
2012-01-01
The present paper, describes the experiences in the Technical Cooperation Project with the IAEA MEX 4/058 related with the Licensed Renewal Process, according with 10 CFR 54, NEI-95-10, NUREG 1800 and NUREG 1801. A domestic data base using Microsoft ACCESS was made following the methodology suggest by 10 CFR 54, and the Reactor Core Isolation Cooling (RCIC) System was selected like a pilot system. The mechanical components within the scope of license renewal and their intended functions were selected and the components subject to Aging Management Review (AMR) were identified. Commodities groups of similar material, environment and intended function were used and the main Ageing Mechanisms were identified. The results were compared with the NUREG 1801 rev. 2 experiences and the possible AMP was addressed. In the case of Laguna Verde Nuclear Power Plant (LVNPP) U1, some of these programs are according with the Generic Aging Lesson Learned of NUREG 1801, while others AMP require modifications. It is important to mention that the application of this methodology will support activities related with long term operation in LVNPP. (author)
Annual review of research projects 1987
International Nuclear Information System (INIS)
Keam, D.W.
1989-04-01
The Australian Radiation Laboratory is a national laboratory whose function is to assist the users of radiation, and those who regulate its use, to ensure that wherever radiation is encountered, it is managed in the safest possible way. In performing this function the Laboratory conducts a varied program of applied research in areas which have implications for occupational or public health. This progress report provides a brief outline of current Laboratory research and development projects and their present status. The material is grouped into the following research fields: uranium, radon and its daughters; environmental radiation monitoring; radiopharmaceuticals and nuclear medicine; X-ray and clinical dosimetry; radionuclide metrology; non-ionising electromagnetic radiations; measurement standards in radiation dosimetry; and radiation effects in solids and gases. Refs., figs., tabs
Project management best practices: forging win-win partnerships
International Nuclear Information System (INIS)
Livet, B.
2006-01-01
This paper reviews various aspects of management of renewable energy projects. It outlines contracting strategies, major cost impacts on balance of plants construction and permitting a wind farm project. It concludes by recommending a careful evaluation of the contracting strategy which best fits the circumstances, consideration of site and balance of plant issues in developing a realistic cost model for the project and making an early contact with authorities to ascertain the permitting required for the project
MULTIPLE PROJECT MANAGEMENT IN THE CONSTRUCTION INDSUTRY
Directory of Open Access Journals (Sweden)
Luciana Hazin Alencar
2010-06-01
Full Text Available The field of project management has historically focused on the administration of one project at a time, a focus that is insufficient given the growing need for organizations to manage multiple projects simultaneously. The requirements of Multiple Project Management (MPM involves demands and practices that are different from those of single projects. MPM poses a special need for coordination of shared resources across multiple projects in a way that can maintain the firm’s strategic focus and facilitate effective decision making. The construction industry is noteworthy for its frequent need for the management of multiple projects. This paper offers a review of the last five years of indexed literature related to multiple project management in the construction industry, identifies gaps and suggests promising new avenues of inquiry.
Project communication in an internal strategic perspective
DEFF Research Database (Denmark)
Ramsing, Line B.
2009-01-01
corporate communication. Originality/value - By challenging the use of the term 'project communication' and extending the concept by defining the aspect of interpersonal project communication and its potential in creating synthesis between the research fields corporate communication and project managment....... of interpersonal project communication? Design/methodology/approach - Based on a literature review of the two above mentioned fields of research the discussion of the potential of interpersonal project communication is put in relation to concepts of power relations in an organisation, use of networks...... there is no mentioning of project communication. Despite the acknowledged need to focus on communication as a whole in projects there is no indication in the literature that any collaboration exists between the field of corporate communication and the field of project management - creating a gap at the intersection...
An Operational ’Project Management Culture’ Framework (Part 1
Directory of Open Access Journals (Sweden)
Yvonne du Plessis
2006-11-01
Full Text Available The aim of this research is to develop an operational ‘project management culture’ framework, which can be used by project managers and organisations to support project work. One of the main causes of project failure is attributed to a non-supportive project management culture in organisations. A triangulation method is followed inclusive of a thorough literature review, a survey questionnaire and a concept mapping process. A project management culture framework with descriptive elements, based on Deal and Kennedy’s (1982 definition of organisational culture, comprising of four dimensions i.e. project process; people in projects; project systems and structure, and project environment was developed.
Energy Technology Data Exchange (ETDEWEB)
None, None
2016-03-01
In the spring and summer of 2015, the Bioenergy Technologies Office (BETO or the Office) of the U.S. Department of Energy (DOE) implemented an external peer review of the projects in its research, development and demonstration (RD&D) portfolio. The Office manages a diverse portfolio of technologies across the spectrum of applied RD&D within the dynamic context of changing budgets and Administration priorities. The Office portfolio is organized according to the biomass-to-bioenergy supply chain—from the feedstock source to the end user (see Figure 1)—with major focus on feedstock supply and biomass conversion. The 2015 Project Peer Review took place March 23-27, 2015, outside of Washington, D.C., in Alexandria, Virginia, and evaluated most of the publicly funded projects in BETO’s portfolio. The subsequent Program Management Review took place on June 25, 2015, in Washington, D.C., and provided an Office- level assessment of strategic planning and programmatic initiatives. The peer review process enables external stakeholders to provide feedback on the responsible use of taxpayer funding and develop recommendations for the most efficient and effective ways to accelerate the development of an advanced bioenergy industry. The planning and execution of these reviews was completed over the course of 10 months, and this report includes the results of both events.
Energy Technology Data Exchange (ETDEWEB)
Kim, Young Joo [Korean Nuclear Society, Daejeon (Korea, Republic of)
2016-05-15
Integrated Project Delivery (IPD) is defined as that people, systems, business structures, and practices of key stakeholders are incorporated into a single-team, with a single process, which executes a project in a way of optimizing the project's outcome, increasing values delivered to the end user, reducing waste, and maximizing efficiency throughout the phases of engineering to construction. The researcher had carried out literature review in terms of IPD to identify major characteristics of IPD which are presented in the following section and had compared such characteristics against peculiarities of nuclear power plant (NPP) construction projects in order to shed light on obstacles in possible application of IPD method to domestic NPP construction projects in the coming days. In this research, three (3) major characteristics of IPD were identified: 1) key stakeholders signing one balanced contract, forming de facto one body, sharing risk and reward 2) an integrated project team being formed in the early stage of a project and providing input to minimize time and cost loss from rework downstream 3) team members co-locating, having open and direct communication, making decisions on time, and pursuing the success of the project itself.
Directory of Open Access Journals (Sweden)
Fábio Cocchi da Silva Eiras
2017-03-01
Full Text Available Over the past decades, the project management field has evolved and consolidated. Facing this growth, this research aims to identify the main trends of research in the area, as well as providing an overview of publications, identifying new issues, changes in approaches and the development of knowledge areas. To do so, a systematic review of the literature was performed with the use of bibliometric study in the papers of the International Journal of Project Management (IJPM, included in SCOPUS, from its first volume to 2015, covering a period of more than 30 years. It was found that developing countries are increasingly concerned in developing research into the field of project management, especially in mega infrastructure projects and public-private partnerships. The risk is a central topic in all periods of analysis, however, the strategic topics such as success in project and portfolio management are among the fastest growing. Issues related to the soft side of project management as skills, culture, and knowledge management have emerged in recent periods. According to the industry, construction projects and projects in information technology are the most studied along the period analysed.
ANALYTICAL AND SCIENTIFIC REVIEW OF PROJECTS AND PROGRAMMES ON CHANGES STRATEGY IMPLEMENTATION
Directory of Open Access Journals (Sweden)
MLODETSKYY V. R.
2017-01-01
Full Text Available Formulation of the problem. Sustainable and successful functioning of the organization in today's competitive market conditions is possible if the organization is an open dynamic system capable of timely and adequately adapt to changes in the environment, this organization should initiate the implementation of innovations, both in production and organizational structure. Most suited for these conditions are project-oriented organizations, when the program's development strategy is developed with a detailed individual relatively independent stages, which are implemented as part of projects. In accordance with the development and improvement of the organization of control systems in the direction of increasing emphasis on the development strategy in relation to operating activities is an important task. Goal and tasks. Explore the hierarchical control system of project-oriented organization towards establishing information flows combine program management system with project management subsystems, included in this program. Conclusions. Concretized the concept of "program" and "project" as a result assumed that the program management is a permanent process in the organization that is adaptable to external changes, and project management (as defined is temporary, so the project management structure are subject to program management structures and are not permanent in the organization's management system.
49 CFR 633.23 - FTA review of PMP.
2010-10-01
... 49 Transportation 7 2010-10-01 2010-10-01 false FTA review of PMP. 633.23 Section 633.23 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.23 FTA review of PMP...
Measurement of Software Project Management Effectiveness
2008-12-01
factors such as advertisement of project mission, top management support, client consultation, personnel issues, client acceptance, etc. Trouble...and PERT (Program/Project Evaluation and Review Technique) and CPM (Critical Path Analysis) charts are process models, and the development of Gantt...models (such as Gantt, PERT and CPM ) got wide-acceptance in industry, as Fuggetta (2000) pointed out few (if any) of the proposed PMLs and related
Taking Stock of Project Value Creation
DEFF Research Database (Denmark)
Laursen, Markus; Svejvig, Per
2014-01-01
This paper presents the outcome of a literature review through classifying and analyzing 59 publications in project value creation literature. The analysis led to five distinct categories: Benefit Realization Management (BRM) and techniques, broad value perspective, value time frame, engineering...... requirements and product development. These five categories cover a wide selection of value creation literature in project contexts. The project types reported in empirical studies are mainly IS/IT and construction and a variety of other types such as R&D and strategy implementation. The literature dates back...
Policies to Avoid Cost Overruns in Infrastructure Projects: Critical Evaluation and Recommendations
Directory of Open Access Journals (Sweden)
Hans Lind
2014-09-01
Full Text Available Many infrastructure projects have cost overruns and there has been a lot of research both on why these cost overruns occur and what can be done to reduce hem. Bent Flyvbjerg is the leading researcher in the area and in this article his proposals are used as the starting point. Besides a literature review, a questionnaire was sent out to experienced Swedish project managers to find out what they thought could reduce cost overruns. The literature review and the questionnaire were the foundation for the proposals formulated in this article. Proposals concerned three areas: (1. Organisational macro-structure, e.g. using more PPP projects but also decentralisation of budgets where cost overruns in one project in a region lead to less alternative projects in the specific region. (2. Organisational quality: It should be easy to see when and where cost overruns occur and who was responsible. There should be a well-developed knowledge management system in the organisation and an organisation culture of openness with a focus on improvements. (3. Organisational processes, e.g. a systematic use of external reviewers in different stages of a project. Keywords: Cost overruns, Infrastructure projects, Policy measures
Proposed Dunvegan hydroelectric project
International Nuclear Information System (INIS)
Houston, M.
2001-01-01
A new hydroelectric project is being proposed on the Peace River in the vicinity of Dunvegan, Alberta, by Glacier Power. The proposal calls for a low head, run-of-the-river hydroelectric power plant which would comprise a powerhouse containing 40 Kaplan turbines, a weir section, two fishways and a boat lock. The capacity of the generating plant would be 80 MW. As per established guidelines, the review process was initiated in July 1999 and is ongoing. Stakeholders, government agencies, both at the federal and provincial levels, are involved in the review process. The potential effects on the ice regime, fish passage and fish mortality and bank stability are the issues that have warranted the most attention to date. Scheduled to begin on October 2, 2001, a public hearing on the project has been arranged by the Alberta Energy and Utilities Board. The objective sought by Glacier Power is to have the project certified as being a green-power plant. Green power is defined as power produced from renewable sources with low environmental impact. The production of power with minimal environmental impacts is being encouraged in Alberta by Glacier Power, which sells power for a premium. 6 refs., 4 figs
British sounding-rocket programme and the Esrange Special Project
International Nuclear Information System (INIS)
Eastwood, G.W.
1975-01-01
British participation in the Esrange Special Project has developed very satisfactorily since the programme was reviewed at the last Esrange Symposium [Eastwood, 1973; Acton, 1973]. Two campaigns have been undertaken at Andoya and several more are projected
Oluvil Port Development Project
DEFF Research Database (Denmark)
Frigaard, Peter; Margheritini, Lucia
Oluvil Port Development Project is the first development of a large port infrastructure in the entire eastern coastline of Sri Lanka. The project is supported by the Danish Foreign Ministry. Feasibility studies and detailed design studies were carried out by Lanka Hydraulic Institute Ltd during...... the years 1995 to 2003. The design was reviewed by COWI a/s. Construction of the port was started in 2008. MT Højgaard a/s acted as contractor. The outer breakwaters were constructed as first part of the project. During and after completion of the breakwaters a serious beach erosion and sand accumulation...... has been observed. Severe erosion is seen north of the harbour and some accumulation of sand is seen south of the harbour. On a sandy coastline like the one in Oluvil such erosion problems as observed are very typical. The report: Oluvil Port Development Project: Studies on Beach Erosion written...
A framework to improve performance measurement in engineering projects
Zheng , Li; Baron , Claude; Esteban , Philippe; Xue , Rui; Zhang , Qiang
2017-01-01
International audience; A wide range of methods and good practices have been developed for the measurement of projects performance. They help project managers to effectively monitor the project progress and evaluate results. However, from a literature review, we noticed several remaining critical issues in measuring projects performance, such as an unbalanced development of Key Performance Indicators types between lagging and leading indicators. On the other hand, systems engineering measurem...
International project marketing: an introduction to the INPM approach
DEFF Research Database (Denmark)
Skaates, Maria Anne; Tikkanen, Henrikki
2003-01-01
marketing takes place. First, we discuss various definitions of projects and project marketing. Second, we consider the implications of three specific features of project business--discontinuity, uniqueness, and complexity--over multiple projects. Third, we assess three overlapping types of postures......Projects are often sold and procured. Therefore this paper reviews recent contributions of the International Network for Project Marketing and Systems Selling (INPM), emphasising the connection between the business relationships of individual projects and the wider environment in which project...... that project-selling firms can adopt in relation to their marketing activities. Finally, we make some suggestions for practitioners responsible for marketing projects and discuss avenues for future academic work in project marketing....
Prioritising transport infrastructure projects: Towards a multi-criterion ...
African Journals Online (AJOL)
Southern African Business Review ... systematic framework for the appraisal of transport infrastructure projects of the type 'budget cycle projects with local ... Cost/benefit analysis, when applied in a classic sense, is not suitable for this purpose, given its ... (optimal allocation of resources), equity (impact distribution aspects),
Nuclear power. Volume 2: nuclear power project management
International Nuclear Information System (INIS)
Anon.
1980-01-01
The following topics are discussed: review of nuclear power plants; licensing procedures; safety analysis; project professional services; quality assurance and project organization; construction, scheduling and operation; construction, scheduling and operation; nuclear fuel handling and fuel management; and plant cost management. 116 references, 115 figures, 33 tables
Essential Skills for Project Stakeholders Identification: Sustainability Perspective
Directory of Open Access Journals (Sweden)
Md. Mashiur Rahman
2017-09-01
Full Text Available In every life cycle of the project there are numerous people or organizations involved either directly or indirectly. While these type of people and organizations involved are called stakeholders and these may include the project team, client or customer, community, environment, suppliers, government. Stakeholders contribute and share their experiences, knowledge, and insights to support the project throughout its life cycle and therefore it is crucial to capture their input. However, before initiation of the project, stakeholders need to be identified. Following the fact that there are strategies and processes for stakeholder identification, it is not clear what skills are needed to employ those strategies for stakeholder identification. These skills are exceedingly important to have because in today's corporate world, the project team must be flexible in every aspect of their job and be able to complement their skills for the success of stakeholder identification. Using literature review, this paper seeks to describe the skills of project leader needed to identify the project team and the external stakeholders. Inductive approach was followed in this study and data was collected qualitatively using secondary sources. There are two essential skills i.e. relationship building skills and communication skills for internal stakeholders and four major skills i.e. communication skills, people skills, intellectual skills and conceptual skills for external stakeholders are identified for the identification of project stakeholders through literature review considering the sustainability issues in the project management.
Energy Technology Data Exchange (ETDEWEB)
None
1982-01-01
Report XI, Technical Audit, is a compendium of research material used during the Initial Effort in making engineering comparisons and decisions. Volumes 4 and 5 of Report XI present those studies which provide a Critical Review of the Design Basis. The Critical Review Report, prepared by Intercontinental Econergy Associates, Inc., summarizes findings from an extensive review of the data base for the H-Coal process design. Volume 4 presents this review and assessment, and includes supporting material; specifically, Design Data Tabulation (Appendix A), Process Flow Sheets (Appendix B), and References (Appendix C). Volume 5 is a continuation of the references of Appendix C. Studies of a proprietary nature are noted and referenced, but are not included in these volumes. They are included in the Limited Access versions of these reports and may be reviewed by properly cleared personnel in the offices of Ashland Synthetic Fuels, Inc.
Integrating TOM into environmental projects, Angela B. Quinlan
International Nuclear Information System (INIS)
Caldwell, J.A.
1992-01-01
Responsible and cost-effective waste management and environmental restoration are best achieved when the principles and procedures of Total Quality Management are made an integral part of the process. By describing three case histories, we explore and explain techniques for using TQM in environmental projects. Key aspects considered include: quality measurement systems; establishing and maintaining standard operating procedures; management and technical peer review; the use of Quality Improvement Teams; Roadmapping (a new procedure that the US Department of Energy is incorporating into environmental restoration programs); and the role of audit teams in document production. The three case histories covered include: The Department of Energy's Uranium Mill Tailings Remedial Action Project on which Roadmapping and Quality Improvement Teams have led to significant changes in procedures; the EPA ARCS program on which adoption of project management Standard Operating Procedures enhanced cost and schedule control; the Jacobs Engineering TQM program that emphasizes performance measurement and management and project technical peer review
Managing Risks in Distributed Software Projects: An Integrative Framework
DEFF Research Database (Denmark)
Persson, John Stouby; Mathiassen, Lars; Boeg, Jesper
2009-01-01
techniques into an integrative framework for managing risks in distributed contexts. Subsequent implementation of a Web-based tool helped us refine the framework based on empirical evaluation of its practical usefulness.We conclude by discussing implications for both research and practice.......Software projects are increasingly geographically distributed with limited face-to-face interaction between participants. These projects face particular challenges that need carefulmanagerial attention. While risk management has been adopted with success to address other challenges within software...... development, there are currently no frameworks available for managing risks related to geographical distribution. On this background, we systematically review the literature on geographically distributed software projects. Based on the review, we synthesize what we know about risks and risk resolution...
Enriching project organizations with formal change agents
DEFF Research Database (Denmark)
Eskerod, Pernille; Justesen, Just Bendix; Sjøgaard, Gisela
2017-01-01
Purpose: Project success requires effective and efficient cooperation between the project organization and the permanent organization in which the project takes place. The purpose of this paper is to discuss potentials and pitfalls from enriching project organizations by appointing peers as formal...... and middle and top management support are major determinants of success within change projects. To select change agents that the employees respect and can identify with, combined with top management prioritization, is important in order for the project organization to benefit from the additional role...... change agents. Design/methodology/approach: The paper is based on a literature review and a multiple-case study in which six organizations participated in an action-oriented research project. The aim for the organizations was to obtain a better health status among the employees by accomplishing...
Preliminary design review report for K Basin Dose Reduction Project
International Nuclear Information System (INIS)
Blackburn, L.D.
1996-01-01
The strategy for reducing radiation dose, originating from radionuclides absorbed in the K East Basin concrete, is to raise the pool water level to provide additional shielding. This report documents a preliminary design review conducted to ensure that design approaches for cleaning/coating basin walls and modifying other basin components were appropriate. The conclusion of this review was that design documents presently conclusion of this review was that design documents presently completed or in process of modification are and acceptable basis for proceeding to complete the design
ALASKA OIL AND GAS EXPLORATION, DEVELOPMENT, AND PERMITTING PROJECT
Energy Technology Data Exchange (ETDEWEB)
Richard McMahon; Robert Crandall; Chas Dense; Sean Weems
2003-08-04
The objective of this project is to eliminate three closely inter-related barriers to oil production in Alaska through the use of a geographic information system (GIS) and other information technology strategies. These barriers involve identification of oil development potential from existing wells, planning projects to efficiently avoid conflicts with other interests, and gaining state approvals for exploration and development projects. Each barrier is the result of either current labor-intensive methods or poorly accessible information. This project brings together three parts of the oil exploration, development, and permitting process to form the foundation for a more fully integrated information technology infrastructure for the State of Alaska. This web-based system will enable the public and other review participants to track permit status, submit and view comments, and obtain important project information online. By automating several functions of the current manual process, permit applications will be completed more quickly and accurately, and agencies will be able to complete reviews with fewer delays. The application will include an on-line diagnostic Coastal Project Questionnaire to determine the suite of permits required for a specific project. The application will also automatically create distribution lists based on the location and type of project, populate document templates for project review start-ups, public notices and findings, allow submission of e-comments, and post project status information on the Internet. Alaska has nearly one-quarter of the nation's supply of crude oil, at least five billion barrels of proven reserves. The American Association of Petroleum Geologists report that the 1995 National Assessment identified the North Slope as having 7.4 billion barrels of technically recoverable oil and over 63 trillion cubic feet of natural gas. From these reserves, Alaska produces roughly one-fifth of the nation's daily crude oil
Systematic review automation technologies
2014-01-01
Systematic reviews, a cornerstone of evidence-based medicine, are not produced quickly enough to support clinical practice. The cost of production, availability of the requisite expertise and timeliness are often quoted as major contributors for the delay. This detailed survey of the state of the art of information systems designed to support or automate individual tasks in the systematic review, and in particular systematic reviews of randomized controlled clinical trials, reveals trends that see the convergence of several parallel research projects. We surveyed literature describing informatics systems that support or automate the processes of systematic review or each of the tasks of the systematic review. Several projects focus on automating, simplifying and/or streamlining specific tasks of the systematic review. Some tasks are already fully automated while others are still largely manual. In this review, we describe each task and the effect that its automation would have on the entire systematic review process, summarize the existing information system support for each task, and highlight where further research is needed for realizing automation for the task. Integration of the systems that automate systematic review tasks may lead to a revised systematic review workflow. We envisage the optimized workflow will lead to system in which each systematic review is described as a computer program that automatically retrieves relevant trials, appraises them, extracts and synthesizes data, evaluates the risk of bias, performs meta-analysis calculations, and produces a report in real time. PMID:25005128
Geothermal Technologies Office 2012 Peer Review Report
Energy Technology Data Exchange (ETDEWEB)
none,
2013-04-01
On May 7-10, 2012, the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, Geothermal Technologies Office conducted its annual program peer review in Westminster, CO. In accordance with the EERE Peer Review Guide, the review provides an independent, expert evaluation of the strategic goals and direction of the office and is a forum for feedback and recommendations on future office planning. The purpose of the review was to evaluate DOE-funded projects for their contribution to the mission and goals of the office and to assess progress made against stated objectives. Project scoring results, expert reviewer comments, and key findings and recommendations are included in this report.
Selection of executors for realization of individual tasks of the project
Directory of Open Access Journals (Sweden)
Asanov Askhat
2017-01-01
Full Text Available This article deals with the task of selection of executors for the realization of individual tasks of a new project. A short review of approaches to the estimation of personnel based on intellectual methods is provided. Two approaches to the task solution of executors’ selection are reviewed. The first approach allows considering estimation of competence of potential executors and data about projects that have already been realized. These data and requirements to the tasks of new projects are presented with the help of cognitive map with correspondent vertices. In the article, a methodologic example of the suggested approach use is introduced. The second approach suggests the use of Hopfield’s neural network. Neural networks allow using the already available experience of project activities during realization of new projects.
Directory of Open Access Journals (Sweden)
Donal Yeang
2012-01-01
Full Text Available Tenure rights over land, forest, and carbon have become a contentious issue within REDD+ implementation across the tropics because local communities could be excluded from REDD+ benefits if land tenure or use and access rights are not clear. This study aims to understand and assess tenure arrangements under the first REDD+ demonstration project in Cambodia, the Oddar Meanchey Com- munity Forestry REDD+ Project. In particular, the study explores the following questions: (1 How are tenure rights arranged in the Oddar Meanchey REDD+ Project? (2 Does the tenure regime recognise the rights of local communities to their land and its associated resources? (3 What kind of institu- tions are put in place to support tenure rights of local communities in the project? The author conducted in-depth semi-structured interviews with key stakeholders and complemented the analysis by participant observation and a review of policy documents and secondary literature. The major finding of this study is that the local communities in the project are still given rights to use and access forest resources, although carbon rights belong to the government. While the government retains ownership over carbon credits, it agreed that at least 50 percent of the net revenue from the sale of carbon credits will flow to participating communities. ------ Besitzrechte an Land, Wald und CO2 sind zu einer umkämpften Angelegenheit in der REDD+ Implementierung in den Tropen geworden. Diese Studie versucht die Besitzregelungen im ersten REDD+ Demons- trationsprojekt in Kambodscha, dem Oddar Meanchey Community Forestry REDD+ Project, zu verstehen und zu bewerten. Die Untersuchung analysiert dabei insbesondere folgende Fragen: (1 Wie sind Besitzrechte im Oddar Meanchey REDD+ Projekt geregelt? (2 Erkennt das Besitzsystem die Rechte von lokalen Gemeinschaften an ihrem Land und den dazugehörigen Ressourcen an? (3 Welche Institutionen werden geschaffen, um die Besitzrechte von lokalen
Project communication in a strategic internal perspective
DEFF Research Database (Denmark)
Ramsing, Line B.
2008-01-01
Purpose - The purpose of this paper is to discus the concept of project communication. What is currently understood by project communication? How and to what degree is it being discussed within the field of corporate communication and project management? And finally, what is the potential of inte...... the concept by defining the aspect of interpersonal project communication and its potential in creating synthesis between the research fields corporate communication and project management....... of interpersonal project communication? Design/methodology/approach - Based on a literature review of the two above mentioned fields of research the discussion of the potential of interpersonal project communication is put in relation to concepts of power relations in an organisation, use of networks...... communication there is no mentioning of project communication. Despite the acknowledged need to focus on communication as a whole in projects there is no indication in the literature that any collaboration exists between the field of corporate communication and the field of project management - creating a gap...
78 FR 65756 - Limitation on Claims Against Proposed Public Transportation Projects
2013-11-01
... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... review of the FTA actions announced herein for the listed public transportation project will be barred... taken final agency actions by issuing certain approvals for the public transportation project listed...
2013 Building Technologies Office Program Peer Review Report
Energy Technology Data Exchange (ETDEWEB)
none,
2013-11-01
The 2013 Building Technologies Office Program Peer Review Report summarizes the results of the 2013 Building Technologies Office (BTO) peer review, which was held in Washington, D.C., on April 2–4, 2013. The review was attended by over 300 participants and included presentations on 59 BTO-funded projects: 29 from BTO’s Emerging Technologies Program, 20 from the Commercial Buildings Integration Program, 6 from the Residential Buildings Integration Program, and 4 from the Building Energy Codes Program. This report summarizes the scores and comments provided by the independent reviewers for each project.
International Nuclear Information System (INIS)
Clark, J.; Limbrick, A.
1996-01-01
This paper identifies and reviews the issues to be addressed and the procedures to be followed during the mobilisation of projects using LFG as an energy source. Knowledge of the procedures involved in project mobilisation, their sequence and probable timescales, is essential for efficient project management. It is assumed that the majority of projects will be situated on existing, licensed landfill sites and, in addition to complying with the relevant conditions of the waste management licence and original planning consent, any proposed developments on the site will require a separate planning consent. Experience in the UK indicates that obtaining planning permission rarely constitutes a barrier to the development of schemes for the utilisation of LFG. Even so, an appreciation of the applicable environmental and planning legislation is essential as this will enable the developer to recognise the main concerns of the relevant planning authority at an early stage of the project, resulting in the preparation of an informed and well-structured application for planning permission. For a LFG utilisation scheme on an existing landfill site, the need to carry out an environmental assessment (EA) as part of the application for planning permission will, in vitually all cases, be discretionary. Even if not deemed necessary by the planning authority, an EA is a useful tool at the planning application stage, to identify and address potential problems and to support discussions with bodies such as the Environment Agency, from whom consents or authorisations may be required. Carrying out an EA can thus provide for more cost-effective project development and enhanced environmental protection. Typically, the principal contractual arrangements, such as the purchase of gas or the sale of electricity, will have been established before the project mobilisation phase. However, there are many other contractural arrangements that must be established, and consents and permits that may be
Permitting plan for Project W-340, Tank 241-C-106 manipulator retrieval arm
International Nuclear Information System (INIS)
Tollefson, K.S.
1995-01-01
This document describes the regulatory requirements and describes alternative strategies for obtaining permits and approvals for Project W-340, Tank 241-C-106 Manipulator Retrieval Arm. A comprehensive review of environmental regulations has indicated that several environmental reviews, permits, and approvals are required before design, construction, and operation of the facility. The environmental reviews, permits, and approvals, as well the regulatory authority potentially applicable to the Project W-340 Long Reach Manipulator Arm include the following: National Environmental Policy Act of 1969 -- US Department of Energy, Headquarters; State Environmental Policy Act of 1971 -- State of Washington Department of Ecology; Air Permitting; Dangerous Waste Permitting; Miscellaneous Reviews/Permits/Approvals. This document describes the environmental reviews, permits, and approval requirements for the project. It provides a summary of permit application data requirements, alternative strategies for permit completion and approval, as well as the estimated probability of success for each alternative strategy
Understanding the Meaning of “Project Success”
Directory of Open Access Journals (Sweden)
Goparaju Purna Sudhakar
2016-09-01
Full Text Available Fortune 500 organizations are executing their tasks using projects. Project management is the area of concentration across the world. Different stakeholders have a different perspective about project success. The meaning of project success had been explained in this article. In addition, the Project Critical Success Factors (CSFs were mentioned. The research of Standish Group on project success and project success metrics was presented. Earlier research on the meaning of project success and project critical success factors was highlighted. The works of Jeffery K. Pinto and Dennis P. Slevin, David and Adam, DeLone and McLean, and The Standish Group Research were discussed in this article. The methodology included secondary research based on literature view of prominent empirical studies and the literature reviews by making note of findings and observations from those studies. The initial literature collected led to further search of articles based on their references. The research findings indicate that the top of the most success factors for many projects include project objective, top management commitment, competent project team, and user involvement.
20% Research & Design Science Project
Spear, Beth A.
2015-04-01
A project allowing employees to use 15 % of their time on independent projects was established at 3M in the 1950's. The result of this project included products like post it notes and masking tape. Google allows its employees to use 20% of their time on independently pursued projects. The company values creativity and innovation. Employees are allowed to explore projects of interest to them one day out of the week, 20 % of their work week. Products like AdSense, Gmail, Google Transit, Google News, and Google Talk are the result of this 20 % program. My school is implementing the Next Generation Science Standards (NGSS) as part of our regularly scheduled curriculum review. These new standards focus on the process of learning by doing and designing. The NGSS are very hands on and active. The new standards emphasize learning how to define, understand and solve problems in science and technology. In today's society everyone needs to be familiar with science and technology. This project allows students to develop and practice skills to help them be more comfortable and confident with science and technology while exploring something of interest to them. This project includes three major parts: research, design, and presentation. Students will spend approximately 2-4 weeks defining a project proposal and educating themselves by researching a science and technology topic that is of interest to them. In the next phase, 2-4 weeks, students design a product or plan to collect data for something related to their topic. The time spent on research and design will be dependant on the topic students select. Projects should be ambitious enough to encompass about six weeks. Lastly a presentation or demonstration incorporating the research and design of the project is created, peer reviewed and presented to the class. There are some problems anticipated or already experienced with this project. It is difficult for all students to choose a unique topic when you have large class sizes
Bellei, Monica; Sabattini, Elena; Pesce, Emanuela Anna; Ko, Young-Hyeh; Kim, Won Seog; Cabrera, Maria Elena; Martinez, Virginia; Dlouhy, Ivan; Paes, Roberto Pinto; Barrese, Tomas; Vassallo, Josè; Tarantino, Vittoria; Vose, Julie; Weisenburger, Dennis; Rüdiger, Thomas; Federico, Massimo; Pileri, Stefano
2017-12-01
Peripheral T-cell lymphomas (PTCLs) comprise a heterogeneous group of neoplasms that are derived from post-thymic lymphoid cells at different stages of differentiation with different morphological patterns, phenotypes and clinical presentations. PTCLs are highly diverse, reflecting the diverse cells from which they can originate and are currently sub-classified using World Health Organization (WHO) 2008 criteria. In 2006 the International T-Cell Lymphoma Project launched the T-Cell Project, building on the retrospective study previously carried on by the network, with the aim to prospectively collect accurate data to improve knowledge on this group of lymphomas. Based on previously published reports from International Study Groups it emerged that rendering a correct classification of PTCLs is quite difficult because the relatively low prevalence of these diseases results in a lack of confidence by most pathologists. This is the reason why the T-Cell Project requested the availability of diagnostic material from the initial biopsy of each patient registered in the study in order to have the initial diagnosis centrally reviewed by expert hematopathologists. In the present report the results of the review process performed on 573 cases are presented. Overall, an incorrect diagnosis was centrally recorded in 13.1% cases, including 8.5% cases centrally reclassified with a subtype eligible for the project and 4.6% cases misclassified and found to be disorders other than T-cell lymphomas; 2.1% cases were centrally classified as T-Cell disorders not included in the study population. Thus, the T-Cell Project confirmed the difficulties in providing an accurate classification when a diagnosis of PTCLs is suspected, singled out the major pitfalls that can bias a correct histologic categorization and confirmed that a centralized expert review with the application of adequate diagnostic algorithms is mandatory when dealing with these tumours. Copyright © 2016 John Wiley & Sons
Time Overrun in Construction Project
Othman, I.; Shafiq, Nasir; Nuruddin, M. F.
2017-12-01
Timely completion is the key criteria to achieve success in any project despite the industry. Unfortunately construction industry in Malaysia has been labelled as industry facing poor performance leading to failure in achieving effective time management. As the consequence most of the project face huge amount of time overrun. This study assesses the causes of construction projects time overrun in Malaysia using structured questionnaire survey. Each respondent is asked to assign a one-to-five rating for each of the 18 time factors identified from literature review. Out of the 50 questionnaires sent out, 33 were received back representing 68% of the response rate. Data received from the questionnaires were analysed and processed using the descriptive statistics procedures. Findings from the study revealed that design and documentation issues, project management and contract administration, ineffective project planning and scheduling, contractor’s site management, financial resource management were the major factors that cause the time overrun. This study is hoped to help the practitioners to implement the mitigation measure at planning stage in order to achieve successful construction projects.
Acousto-optic laser projection systems for displaying TV information
International Nuclear Information System (INIS)
Gulyaev, Yu V; Kazaryan, M A; Mokrushin, Yu M; Shakin, O V
2015-01-01
This review addresses various approaches to television projection imaging on large screens using lasers. Results are presented of theoretical and experimental studies of an acousto-optic projection system operating on the principle of projecting an image of an entire amplitude-modulated television line in a single laser pulse. We consider characteristic features of image formation in such a system and the requirements for its individual components. Particular attention is paid to nonlinear distortions of the image signal, which show up most severely at low modulation signal frequencies. We discuss the feasibility of improving the process efficiency and image quality using acousto-optic modulators and pulsed lasers. Real-time projectors with pulsed line imaging can be used for controlling high-intensity laser radiation. (review)
Acousto-optic laser projection systems for displaying TV information
Energy Technology Data Exchange (ETDEWEB)
Gulyaev, Yu V [V.A.Kotel' nikov Institute of Radio Engineering and Electronics, Russian Academy of Sciences, Moscow (Russian Federation); Kazaryan, M A [P N Lebedev Physics Institute, Russian Academy of Sciences, Moscow (Russian Federation); Mokrushin, Yu M [D.V. Efremov Scientific Research Institute of Electrophysical Apparatus (Russian Federation); Shakin, O V [Ioffe Physical Technical Institute, Russian Academy of Sciences, St. Petersburg (Russian Federation)
2015-04-30
This review addresses various approaches to television projection imaging on large screens using lasers. Results are presented of theoretical and experimental studies of an acousto-optic projection system operating on the principle of projecting an image of an entire amplitude-modulated television line in a single laser pulse. We consider characteristic features of image formation in such a system and the requirements for its individual components. Particular attention is paid to nonlinear distortions of the image signal, which show up most severely at low modulation signal frequencies. We discuss the feasibility of improving the process efficiency and image quality using acousto-optic modulators and pulsed lasers. Real-time projectors with pulsed line imaging can be used for controlling high-intensity laser radiation. (review)
Learning from project experiences using a legacy-based approach
Cooper, Lynne P.; Majchrzak, Ann; Faraj, Samer
2005-01-01
As project teams become used more widely, the question of how to capitalize on the knowledge learned in project teams remains an open issue. Using previous research on shared cognition in groups, an approach to promoting post-project learning was developed. This Legacy Review concept was tested on four in tact project teams. The results from those test sessions were used to develop a model of team learning via group cognitive processes. The model and supporting propositions are presented.
Status report : Terra Nova project environmental assessment panel : recommendations
International Nuclear Information System (INIS)
2002-01-01
An application to the Canada-Newfoundland Offshore Petroleum Board (CNOPB) was submitted by Petro-Canada on August 5, 1996, notifying of its intent to develop the petroleum resources located at the Terra Nova field. The provincial and federal governments jointly appointed the Terra Nova Project Environmental Panel, and the board of the CNOPB referred to it the application documents for review. The environmental effects, considerations of human safety incorporated into the design and operation of the Project, the general approach to the development and exploitation of the petroleum resources, and the employment and industrial benefits expected to be derived from the Project were the issues under review by the Panel. On April 22, 1997, public hearings into the review began, and the final report was submitted to governments and the Board in August 1997. The report included 75 recommendations. The Project was approved in Decision 97.02 in December 1997, and the Board dealt with each of the recommendations. The respective positions of the Governments of Canada and Newfoundland and Labrador with regard to the recommendations that fell outside the jurisdiction of the Board were made public. A status report on every one of the 75 recommendations is provided in the present report. The recommendation is repeated, the verbatim response taken from Decision 97.02 included, followed by the status of the response. The production operations phase of the Project accounts for approximately 65 per cent of the recommendations. January 20, 2002 was the date the Project was begun
Energy Technology Data Exchange (ETDEWEB)
Korpilahti, A [Metsaeteho Oy, Helsinki (Finland)
1997-12-01
The research and development work was very active on the area of wood derived fuels during the past year 1996. Totally some 40 projects were going on, and till the end of the year about 15 projects were completed. The projects broadly covered the research area focusing from material flows, productivity studies, basic wood properties to several case studies. When new production methods and machinery was introduced earlier by demonstration projects, now they were investigated by follow up projects. The economical and quality results of logging residue harvesting and comminution seem quite satisfactory, but integrated methods and production chains still need research and development. (orig.)
Comprehensive review of an accelerated nursing program: a quality improvement project.
Nugent, Elinor; LaRocco, Susan
2014-01-01
Accelerated second-degree programs are designed to provide entry into baccalaureate nursing program for people who have achieved bachelor's degree in another field. These programs were often designed to respond to nursing shortages at local and national levels. Programs commonly use a cohort model and move students through an intensive structure combining classroom and clinical requirement with a 2-year period. The accelerated second-degree nursing program, Accelerated Entry Level to Nursing program at our small liberal arts college, was considered to be successful. The program had excellent graduation rates and National Council Licensure Examination for Registered Nurses pass rates, indicating that the program was preparing the graduate to thrive in the practice setting. The program had been in existence for more than 7 years, with highly competitive admissions and high student satisfaction. The objective of this study was to provide a quality improvement assessment process to capture quantitative and qualitative information about the graduates. This information would be used to inform our own nursing education department and would provide metrics and information for nurse leaders regarding the rigor of these programs and the potential of graduates. Continuous quality improvement is a vital component in nursing education as well as in the clinical setting. With this in mind, a comprehensive review was undertaken by the nursing faculty during the eighth year of the highly successful accelerated nursing program in a small liberal arts college. This quality improvement project was designed to review existing metrics and to collect additional data through survey and focus groups in order to capture experiences of the program graduates. Graduates of the accelerated program from 2005 to 2011 were included in this study. Faculty who teach in the program participated in focus groups. From 2005 to 2011, there have been a total of 196 graduates in 8 cohorts; 194 surveys
Drawing from past experience to improve the management of future underground projects
International Nuclear Information System (INIS)
Laughton, Christopher; Fermilab
2004-01-01
The high-energy physics community is currently developing plans to build underground facilities as part of its continuing investigation into the fundamental nature of matter. The tunnels and caverns are being designed to house a new generation of particle accelerators and detectors. For these projects, the cost of constructing the underground facility will constitute a major portion of the told capital cost and project viability can be greatly enhanced by paying careful attention to design and construction practices. A review of recently completed underground physics facilities and related literature has been undertaken to identify some management principles that have proven successful in underground practice. Projects reviewed were constructed in the United States of America and Europe using both Design-Build and more traditional Engineer-Procure-Construct contract formats. Although the physics projects reviewed tend to place relatively strict tolerances on alignment, stability and dryness, their overall requirements are similar to those of other tunnels and it is hoped that some of the principles promoted in this paper will be of value to the owner of any underground project
International Nuclear Information System (INIS)
Foley, T.A. Jr.
1981-08-01
This report presents the implementation of an iterative procedure that solves the following bivariate interpolation problem: Given N distinct points in the plane (x/sub i/, y/sub i/) and N real numbers Z/sub i/, construct a function F(x,y) that satisfies F(x/sub i/, y/sub i/) = Z/sub i/, for i = 1, ..., N. This problem can be interpreted as fitting a surface through N points in three dimensional space. The application of primary concern to the Offsite Radiation Exposure Review Project is the characterization of the radionuclide activity resulting from nuclear tests. Samples of activity were measured at various locations. The location of the sample point is represented by (x/sub i/, y/sub i/), and the magnitude of the reading is represented by Z/sub i/. The method presented in this report is constructed to be efficient on large data sets, stable on the large variations of the Z/sub i/ magnitudes, and capable of smoothly filling in areas that are void of data. This globally defined icode was initiateminednitial shock but to two later eriological invaders are Staphylococcus albus, Beta-hemolytic Streptococcus e to the same general semiclassical treatment
The application of post-project reviews in events management by cultural operators
Benadict Rajasegaram, Annet
2016-01-01
Organisations have evidently shifted towards the projectification of their activities and operations across the world and across industries by which project management is not only limited to construction and engineering projects anymore. The projectification has shed light on the amount of project success and failure in which both have been noted to have a steep difference between each other. Whilst many factors have been discovered to be a trigger of failure or success one emerging subject t...
International Nuclear Information System (INIS)
Vigdor, S.E.
1996-01-01
A storage ring with internal targets offers a novel, cost-effective and very well-suited environment for pursuing experiments with multi-GeV polarized light-ion beams. The Indiana University Cyclotron Facility is in the late stages of preparing a funding proposal for such a synchrotron/storage ring, called LISS. I review the status, the extensive technical advantages, and the projected physics program of LISS. (orig.)
Business Cases for Major Public Infrastructure Projects in Canada
Directory of Open Access Journals (Sweden)
Mario Iacobacci
2017-11-01
Full Text Available When governments announce that they are going to spend vast sums of taxpayers’ money on a new public infrastructure project, you can be certain they will praise all the terrific new benefits that the project will bring to citizens, making everyone’s life easier, safer, greener and better. But this does not tell us whether we are better off as a society, after accounting for the cost of these projects borne by taxpayers today and well into the future. In reality, there is a meaningful risk that a project undertaken without a proper business case could end up making citizens’ lives worse. That new commuter train might look sleek and shiny and seem convenient for some, but a close business case analysis of recent transit projects in Canada’s three largest cities suggests that in as many as four cases out of 21 projects, the burden of paying for the projects does not justify the public investment. In a review of thirteen recent public transit projects in the Greater Toronto and Hamilton Area (GTHA, at least three projects had benefits that fell short of the costs. Yet, all three projects went ahead (or have been funded. Only one project showed large net benefits for citizens once all considerations were accounted for. Three projects showed small net benefits – of a size that can be easily offset by a modest cost over-run. The six remaining projects did not have any publicly available business cases. In the Greater Montreal area, a review of three recent major transit projects turned up no evidence of a publicly available business case for any of them. As a result, Montrealers are in the dark as to how much benefit or value destruction the three projects are responsible for. Things are far more encouraging in Vancouver, however, where three out of the five major transit projects undertaken or funded in recent years were backed by business cases showing a net benefit. Only one project did not show a net benefit and one project did not have a
Citizen Sky, An Update on the AAVSO's New Citizen Science Project
Turner, Rebecca; Price, A.; Henden, A.; Stencel, R.; Kloppenborg, B.
2011-01-01
Citizen Sky is a multi-year, NSF-funded, citizen science project focusing on the bright variable star, epsilon Aurigae. Citizen Sky goes beyond simple observing to include a major data analysis component. The goal is to introduce the participant to the full scientific process from background research to paper writing for a peer-reviewed journal. The first year of the project, 2009-10, was dedicated to developing project infrastructure, educating participants about epsilon Aurigae, and training these participants to observe the star and report their data. Looking forward, years two and three of the project will focus on assembling teams of participants to work on their own analysis and research. Results will be published in a special issue of the peer-reviewed Journal of the AAVSO. This project has been made possible by the National Science Foundation.
Project governance: "Schools of thought"
Directory of Open Access Journals (Sweden)
Michiel Christiaan Bekker
2014-02-01
Full Text Available The terminology, definition and context of project governance have become a focal subject for research and discussions in project management literature. This article reviews literature on the subject of project governance and categorise the arguments into three schools of thought namely the single-firm school, multi-firm school and large capital school. The single-firm school is concerned with governance principles related to internal organisational projects and practice these principles at a technical level. The multi-firm school address the governance principles concerned with two of more organisations participating on a contractual basis on the same project and focus their governance efforts at the technical and strategic level. The large capital school consider projects as temporary organisations, forming their own entity and establishing governance principles at an institutional level. From these schools of thought it can be concluded that the definition of project governance is dependent on the type of project and hierarchical positioning in the organisation. It is also evident that further research is required to incorporate other governance variables and mechanisms such as transaction theory, social networks and agency theory. The development of project governance frameworks should also consider the complexity of projects spanning across international companies, across country borders and incorporating different value systems, legal systems, corporate governance guidelines, religions and business practices.
78 FR 53436 - Improving Performance of Federal Permitting and Review of Infrastructure Projects
2013-08-29
... projects, and by implementing best-management practices. These best-management practices include... role of the Project Proponent at this stage is to gather initial information to be included in the... Projects AGENCY: Office of Electricity Delivery and Energy Reliability, Department of Energy. ACTION...
Advertising Citizen Science: A Trailer for the Citizen Sky Project
Wyatt, Ryan; Price, A.
2012-01-01
Citizen Sky is a multi-year, NSF funded citizen science project involving the bright and mysterious variable star epsilon Aurigae. The project was conceived by the IYA 2009 working group on Research Experiences for Students, Teachers, and Citizen-Scientists. Citizen Sky goes beyond simple observing to include a major data analysis component, introducing participants to the full scientific process from background research to paper writing for a peer-reviewed journal. As a means of generating interest in the project, the California Academy of Sciences produced a six-minute "trailer” formatted for both traditional and fulldome planetariums as well as HD and web applications. This talk will review the production process for the trailer as well as the methods of distribution via planetariums, social media, and other venues_along with an update on the Citizen Sky Project as a whole. We will show how to use a small, professionally-produced planetarium trailer to help spread word on a citizen science project. We will also show preliminary results on a study about how participation level/type in the project affects science learning.
Integrating ecological restoration into CDM forestry projects
International Nuclear Information System (INIS)
Ma, Maohua; Haapanen, Toni; Singh, Ram Babu; Hietala, Reija
2014-01-01
Highlights: • Concerns and issues in sustainability of CDM forestry projects are reviewed. • Ecological restoration is suggested to be integrated in the CDM framework. • As an ecosystem supporting service, soil restoration on degraded land is of primary importance. • Regenerating forests naturally rather than through monoculture plantations is suggested. • Potential social impacts of ecological restoration are discussed. - Abstract: The Clean Development Mechanism (CDM) is proposed to reduce greenhouse gas emissions and promote sustainable development. CDM forestry projects should contribute to mitigation of climate change through afforestation and reforestation (A/R) activities on degraded land in developing countries. However, like other types of CDM projects, the forestry projects have encountered a number of concerns and critiques. Appropriate approaches and concrete aims to achieve long-term sustainability have been lacking, and reforms have therefore been called for. The aims of this paper are to examine the published information relevant to these concerns, and frame appropriate approaches for a more sustainable CDM. In this review, as a first step to tackle some of these issues, ecological restoration is suggested for integration into the CDM framework. Essentially, this involves the restoration of ecosystem supporting service (soil restoration), upon which forests regenerate naturally rather than establishing monoculture plantations. In this way, forestry projects would bring cost-effective opportunities for multiple ecosystem services. Potential approaches, necessary additions to the monitoring plans, and social impacts of ecological restoration in CDM projects are discussed
Summary of EPRI projects for improving power plant maintenance and maintainability
International Nuclear Information System (INIS)
Shugars, H.G.; Poole, D.N.; Pack, R.W.
1979-01-01
The Electric Power Research Institute is sponsoring projects to improve power plant maintenance and maintainability. Areas presently being emphasized are improvements in plant design for maintainability, improvements in performing nuclear plant refuelings, and development of on-line monitoring and diagnostic systems for various plant components. The seven projects are reviewed. They are: (1) human factors review of power plant maintainability; (2) refueling outage improvement; (3) on-line monitoring and diagnostics for power plant machinery; (4) acoustic emission and vibrati1on signature analysis of fossil fuel plant components; (5) acoustic monitoring of power plant valves; (6) on-line monitoring and diagnostics for generators; and (7) detection of water induction in steam turbines. Each project contractor and the project manager are listed for reference. 8 references
Development of web-based safety review advisory system
International Nuclear Information System (INIS)
Kim, M. W.; Lee, H. C.; Park, S. O.; Lee, K. H.; Hur, K. Y.; Lee, S. J.; Choi, S. S.; Kang, C. M.
2002-01-01
For the development of an expert system supporting the safety review of nuclear power plants, the application was implemented after gathering necessary theoretical background and practical requirements. The general and the detail functional specifications were established, and they are investigated by KINS (Korea Institute of Nuclear Safety). The Safety Review Advisory System(SRAS), this application on web-server environment was developed according to the above specifications. Reviews can do their safety reviewing regardless of their speciality or reviewing experiences because SRAS is operated by the safety review plans which are converted to standardized format. When the safety reviewing is carried out by using SRAS, the results of safety reviewing are accumulated in the database and may be utilized later usefully, and we can grasp safety reviewing progress. Users of SRAS are categorized into four groups, administrator, project manager, project reviewer and general reviewer. Each user group is delegated appropriate access capability. The function and some screen shots of SRAS are described
Development of web-based safety review advisory system
International Nuclear Information System (INIS)
Kim, M. W.; Hur, K. Y.; Lee, S. J.; Choi, S. J.
2002-01-01
For the development of an expert system supporting the safety review of nuclear power plants, the application was implemented after gathering necessary theoretical background and practical requirements. The general and the detail functional specifications were established, and they are investigated by KINS. Safety Review Advisory System (SRAS), this application on web-server environment was developed according to the above specifications. Reviews can do their safety reviewing regardless of their speciality or reviewing experiences because SRAS is operated by the safety review plans which are converted to standardized format. When the safety reviewing is carried out by using SRAS, the results of safety reviewing are accumulated in the database and may be utilized later usefully, and we can grasp safety reviewing progress. Users of SRAS are categorized into four groups, administrator, project manager, project reviewer and general reviewer. Each user group is delegated appropriate access capability. The function and some screen shots of SRAS are described
Priority Determination for AVC Funded R&D Projects.
Wilkinson, Gene L.
As an extension of ideas suggested in an earlier paper which proposed a project control system for Indiana University's Audio-Visual Center (see EM 010 306), this paper examines the establishment of project legitimacy and priority within the system and reviews the need to stimulate specific research proposals as well as generating a matrix of…
Open Source Approach to Project Management Tools
Directory of Open Access Journals (Sweden)
Romeo MARGEA
2011-01-01
Full Text Available Managing large projects involving different groups of people and complex tasks can be challenging. The solution is to use Project management software, which allows a more efficient management of projects. However, famous project management systems can be costly and may require expensive custom servers. Even if free software is not as complex as Microsoft Project, is noteworthy to think that not all projects need all the features, amenities and power of such systems. There are free and open source software alternatives that meet the needs of most projects, and that allow Web access based on different platforms and locations. A starting stage in adopting an OSS in-house is finding and identifying existing open source solution. In this paper we present an overview of Open Source Project Management Software (OSPMS based on articles, reviews, books and developers’ web sites, about those that seem to be the most popular software in this category.
Engaging Clinical Nurses in Quality Improvement Projects.
Moore, Susan; Stichler, Jaynelle F
2015-10-01
Clinical nurses have the knowledge and expertise required to provide efficient and proficient patient care. Time and knowledge deficits can prevent nurses from developing and implementing quality improvement or evidence-based practice projects. This article reviews a process for professional development of clinical nurses that helped them to define, implement, and analyze quality improvement or evidence-based practice projects. The purpose of this project was to educate advanced clinical nurses to manage a change project from inception to completion, using the Six Sigma DMAIC (Define, Measure, Analyze, Improve, Control) Change Acceleration Process as a framework. One-to-one mentoring and didactic in-services advanced the knowledge, appreciation, and practice of advanced practice clinicians who completed multiple change projects. The projects facilitated clinical practice changes, with improved patient outcomes; a unit cultural shift, with appreciation of quality improvement and evidence-based projects; and engagement with colleagues. Project outcomes were displayed in poster presentations at a hospital exposition for knowledge dissemination. Copyright 2015, SLACK Incorporated.
What Are They Talking About? Analyzing Code Reviews in Pull-Based Development Model
Institute of Scientific and Technical Information of China (English)
Zhi-Xing Li; Yue Yu; Gang Yin; Tao Wang; Huai-Min Wang
2017-01-01
Code reviews in pull-based model are open to community users on GitHub. Various participants are taking part in the review discussions and the review topics are not only about the improvement of code contributions but also about project evolution and social interaction. A comprehensive understanding of the review topics in pull-based model would be useful to better organize the code review process and optimize review tasks such as reviewer recommendation and pull-request prioritization. In this paper, we first conduct a qualitative study on three popular open-source software projects hosted on GitHub and construct a fine-grained two-level taxonomy covering four level-1 categories (code correctness, pull-request decision-making, project management, and social interaction) and 11 level-2 subcategories (e.g., defect detecting, reviewer assigning, contribution encouraging). Second, we conduct preliminary quantitative analysis on a large set of review comments that were labeled by TSHC (a two-stage hybrid classification algorithm), which is able to automatically classify review comments by combining rule-based and machine-learning techniques. Through the quantitative study, we explore the typical review patterns. We find that the three projects present similar comments distribution on each subcategory. Pull-requests submitted by inexperienced contributors tend to contain potential issues even though they have passed the tests. Furthermore, external contributors are more likely to break project conventions in their early contributions.
Energy Technology Data Exchange (ETDEWEB)
Kutryk, T. [Husky Oil Operations Ltd., Calgary, AB (Canada)
2004-07-01
This paper presented an overview of mega-project management. Issues concerning scope, cost and schedule were discussed, with reference to the idea that a choice must be made from the outset as to which of the 3 is a main priority. The importance of preparation and the development of a fully resourced plan was emphasized. The use of the parametric 4-D model was discussed. Lessons that the construction industry may learn from manufacturers were presented along with issues of contract development and the role and importance of the project manager. Issues concerning performance measurement were reviewed, including lagging indicators. Project division factors were also discussed, with reference to data lags, naturally concurrent processes and over the fence units. A case study of Walmart was presented. Project design packages and long lead time items were discussed, as were issues concerning human resources. Functional units were examined in relation to zones of influence and unit integration. Various combinations of zones of influence were presented. Issues concerning span of control and varying relationships within a project were discussed. It was emphasized that great deeds can be accomplished by attracting the best people. tabs., figs.
Breckinridge Project, initial effort
Energy Technology Data Exchange (ETDEWEB)
None, None
1982-09-01
Report III, Volume 1 contains those specifications numbered A through J, as follows: General Specifications (A); Specifications for Pressure Vessels (C); Specifications for Tanks (D); Specifications for Exchangers (E); Specifications for Fired Heaters (F); Specifications for Pumps and Drivers (G); and Specifications for Instrumentation (J). The standard specifications of Bechtel Petroleum Incorporated have been amended as necessary to reflect the specific requirements of the Breckinridge Project, and the more stringent specifications of Ashland Synthetic Fuels, Inc. These standard specifications are available to the Initial Effort (Phase Zero) work performed by all contractors and subcontractors. Report III, Volume 1 also contains the unique specifications prepared for Plants 8, 15, and 27. These specifications will be substantially reviewed during Phase I of the project, and modified as necessary for use during the engineering, procurement, and construction of this project.
Hack, Catherine J.
2012-01-01
Undergraduate research projects in the life sciences encompass a broad range of studies, some of which may require the participation of human subjects or other activities which may raise ethical concerns. As universities are accountable for all projects undertaken under their auspices they must ensure that these projects adhere to legal…
Formal design review report project W-151 mixer pump procurement
Energy Technology Data Exchange (ETDEWEB)
Crass, D.W.
1997-01-21
A formal design review for WHC-S-0040 was held on January 21, 1993. The review was completed January 29, 1993. No outstanding action items existed. Comments were recorded on Record Comment Record (RCR) forms and incorporated into the specification. The specification was considered acceptable, approved and issued as WHC-S-0040, Rev. 0 on March 4, 1993.
Russian Language Analysis Project
Serianni, Barbara; Rethwisch, Carolyn
2011-01-01
This paper is the result of a language analysis research project focused on the Russian Language. The study included a diverse literature review that included published materials as well as online sources in addition to an interview with a native Russian speaker residing in the United States. Areas of study include the origin and history of the…
Project-Based Learning Not Just for STEM Anymore
Duke, Nell K.; Halvorsen, Anne-Lise; Strachan, Stephanie L.
2016-01-01
The popularity of project-based learning has been driven in part by a growing number of STEM schools and programs. But STEM subjects are not the only fertile ground for project-based learning (PBL). Social studies and literacy content, too, can be adapted into PBL units to benefit teaching and learning, the authors argue. They review key studies…
7 CFR 3400.20 - Grantee review prior to award.
2010-01-01
... the funded project has changed significantly, other scientific discoveries have affected the project... scientific peer review conducted in accordance with § 3400.21. For education and extension projects, such...
Peck, Myron A.; Arvanitidis, Christos; Butenschön, Momme; Canu, Donata Melaku; Chatzinikolaou, Eva; Cucco, Andrea; Domenici, Paolo; Fernandes, Jose A.; Gasche, Loic; Huebert, Klaus B.; Hufnagl, Marc; Jones, Miranda C.; Kempf, Alexander; Keyl, Friedemann; Maar, Marie; Mahévas, Stéphanie; Marchal, Paul; Nicolas, Delphine; Pinnegar, John K.; Rivot, Etienne; Rochette, Sébastien; Sell, Anne F.; Sinerchia, Matteo; Solidoro, Cosimo; Somerfield, Paul J.; Teal, Lorna R.; Travers-Trolet, Morgan; van de Wolfshaar, Karen E.
2018-02-01
We review and compare four broad categories of spatially-explicit modelling approaches currently used to understand and project changes in the distribution and productivity of living marine resources including: 1) statistical species distribution models, 2) physiology-based, biophysical models of single life stages or the whole life cycle of species, 3) food web models, and 4) end-to-end models. Single pressures are rare and, in the future, models must be able to examine multiple factors affecting living marine resources such as interactions between: i) climate-driven changes in temperature regimes and acidification, ii) reductions in water quality due to eutrophication, iii) the introduction of alien invasive species, and/or iv) (over-)exploitation by fisheries. Statistical (correlative) approaches can be used to detect historical patterns which may not be relevant in the future. Advancing predictive capacity of changes in distribution and productivity of living marine resources requires explicit modelling of biological and physical mechanisms. New formulations are needed which (depending on the question) will need to strive for more realism in ecophysiology and behaviour of individuals, life history strategies of species, as well as trophodynamic interactions occurring at different spatial scales. Coupling existing models (e.g. physical, biological, economic) is one avenue that has proven successful. However, fundamental advancements are needed to address key issues such as the adaptive capacity of species/groups and ecosystems. The continued development of end-to-end models (e.g., physics to fish to human sectors) will be critical if we hope to assess how multiple pressures may interact to cause changes in living marine resources including the ecological and economic costs and trade-offs of different spatial management strategies. Given the strengths and weaknesses of the various types of models reviewed here, confidence in projections of changes in the
Assessment and financing of electric power projects
International Nuclear Information System (INIS)
Moscote, R.A.
1976-01-01
The aim of the appraisal of a project is to examine the economic need which a project is designed to meet, to judge whether the project is likely to meet this need in an efficient way, and to conclude what conditions should be attached to eventual Bank financing. Bank involvement continues throughout the life of the project helping to ensure that each project is carried out at the least possible cost and that it makes the expected contribution to the country's development. This paper gives an idea about the origin, nature and functions of the World Bank Group, describes the criteria used by the Bank in its power project appraisals, discusses the Bank's views on nuclear power, and concludes with a review of past lending and probable future sources of financing of electrical expansion in the less developed countries. (orig./UA) [de
Project finance and photovoltaic power plants : a theoretical and practical perspective
Aasgaard, Anne Kristine
2010-01-01
Project finance is a defined structure for developing new activity which involves establishing the project as a separate unit. The review of literature exhibits the distinctive characteristics of project finance and provides a rationale of this form of financing. Project finance entails financial modelling, risk management, legal aspects and the creation of a financial structure. The thesis explores practical use of project finance in a case study of a photovoltaic power plant and presents a ...
Ponsoni, L.; Nauw, J.J.; Smit, M.; Ober, S.; Nichols, C.; Kenkhuis, J.; Schmidt, C.; Buatois, A.; de Haas, P.
2016-01-01
In the context of the BlueTEC project, this report starts by introducing theBlueTEC tidal energy platform and reviewing the patterns of circulation of theMarsdiep inlet. The energy resource assessment and the site selection for theplatform's deployment are reported. This document analyses di?erent
Risk Factors in ERP Implementation Projects for Process Oriented
Directory of Open Access Journals (Sweden)
Andrzej Partyka
2009-09-01
Full Text Available This paper present review and analysis of risk factors, which could affect successful implementation of ERP system, for project performed in project oriented organizations. Presented risk breakdown structure and the list of common risk factors, are well-suited for ERP implementation projects. Considered risk categories allow for complex risk analysis. Additionally, mapping of risk importance for particular implementation phases is presented. Making presented model an important input for project risk management process, especially for the beginning phases which require identification of risk factors.
Recording and accounting for stakeholder involvement in systematic reviews.
Saan, Marieke C; Boeije, Hennie R; Sattoe, Jane N T; Bal, Marjolijn I; Missler, Marjolein; van Wesel, Floryt
2015-06-01
The use of stakeholders in systematic reviews is increasingly valued, but their influence on the systematicity of the review is often unclear. The aim of this study was to describe some of the processes of involvement of stakeholders and to demonstrate a Tool for Recording and Accounting for Stakeholder Involvement (TRASI). We demonstrate the TRASI in two worked examples. In one project, the reviewers collaborated with the end-user and an expert during the literature search. In the other project, experts were consulted to generate keywords before searching the literature. In the first project, disagreements about keywords to identify studies for the research topic were solved by informal discussion. In the second project, difficulties arose in reaching agreement between experts and reviewers about the core construct and the meaningful keywords associated with it. The TRASI aids researchers to systematically and transparently account for the decisions taken. The TRASI supports information specialists and librarians to shape the search strategy to match the objectives of the review. We propose the TRASI as a first step in resolving the challenges of detecting and reconstructing stakeholder influences. Potential new applications of the TRASI are discussed. © 2015 Health Libraries Group.
Reducing NPR 7120.5D to Practice: Preparing for a Life-Cycle Review
Taylor, Randall L.
2008-01-01
In March 2007, NASA issued revised rules for space flight project management, NPR 7120.5D, 'NASA Space Flight Program and Project Management Requirements.' Central to the new rules was the construct of Key Decision Points, maturity gates that the project team must pass in order to continue development. In order that the KDP decision be fully informed, the NPR required, as entrance criteria for the gate, the generation and delivery of specified planning, technical, and cost/schedule documents (gate products) and a life-cycle review, the Preliminary Design Review. Building on JPL experience on the Prometheus and Juno projects, the team successfully organized for and conducted these reviews on an aggressive schedule. Key actions were taken to proactively interact with the SRB, produce high-quality gate products with stakeholder review, generate review presentation materials, and handle a myriad of supporting logistical functions. A review preparation team was established, including a Review Captain and leads for documentation, information systems, and logistics, and their roles, responsibilities and task assignments were identified. Aids were produced, including a detailed review preparation schedule and a comprehensive gate products production table. Institutional support was leveraged early and often. Implementation strategy reflected the needs of a nationally-distributed team, as well as applicable export control and IT security requirements. This paper gives a brief overview of the GRAIL mission and its project management challenges, provides a detailed description of project PMSR and PDR preparation and execution activities, including positive and negative lessons learned, and identifies recommendations for future NASA (and non-NASA) project teams.
Waste Management Project Contingency Analysis
International Nuclear Information System (INIS)
Edward L. Parsons, Jr.
1999-01-01
The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion
Review of the Tritium Extraction Facility design
International Nuclear Information System (INIS)
Barton, R.W.; Bamdad, F.; Blackman, J.
2000-01-01
The Defense Nuclear Facilities Safety Board (DNFSB) is an independent executive branch agency responsible for technical safety oversight of the US Department of Energy's (DOE's) defense nuclear facilities. One of DNFSB's responsibilities is the review of design and construction projects for DOE's defense nuclear facilities to ensure that adequate health and safety requirements are identified and implemented. These reviews are performed with the expectation that facility designs are being developed within the framework of a site's Integrated Safety Management (ISM) program. This paper describes the application of ISM principles in DNFSB's ongoing review of the Tritium Extraction Facility (TEF) design/construction project
Review of the Tritium Extraction Facility Design
International Nuclear Information System (INIS)
Ronald W. Barton; Farid Bamdad; Joel Blackman
2000-01-01
The Defense Nuclear Facilities Safety Board (DNFSB) is an independent executive branch agency responsible for technical safety oversight of the U.S. Department of Energy's (DOE's) defense nuclear facilities. One of DNFSB's responsibilities is the review of design and construction projects for DOE's defense nuclear facilities to ensure that adequate health and safety requirements are identified and implemented. These reviews are performed with the expectation that facility designs are being developed within the framework of a site's Integrated Safety Management (ISM) program. This paper describes the application of ISM principles in DNFSB's ongoing review of the Tritium Extraction Facility (TEF) design/construction project
Energy Technology Data Exchange (ETDEWEB)
NONE
2005-10-15
The present review report presents the two wind farms Horns Rev and Nysted with regard to environmental characteristics and the results of the environmental studies carried out in connection with the Environmental Impact Assessment (EIA) and the baseline and monitoring programmes at the two sites. The descriptions of the programmes are based on extracts from the individual annual reports. Detailed information on method, programmes and conclusions can be found in these reports (see Appendix 1). This review report is divided into two parts. The first part contains a description of the potential environmental impacts of offshore wind farms and the potentially affected part of the environment. The second part includes a description of Horns Rev and Nysted Offshore Wind Farm and the environmental studies carried out here until the end of 2003. Appendix I is a list of the literature published on the studies carried out at Horns Rev and Nysted Offshore Wind Farm. Appendix II is a list of some of the literature relevant to the demonstration projects but not directly related to the projects. The offshore wind farm situated in the Roedsand area is officially denoted Nysted Offshore Wind Farm, and in the present report the denotation 'Nysted' will be used as well when referring to Nysted Offshore Wind Farm. The denotation Roedsand will be used when referring to the actual area Roedsand. (au)
Energy Technology Data Exchange (ETDEWEB)
NONE
2004-09-15
The present review report presents the two wind farms Homs Rev and Nysted, with regard to environmental characteristics and the results of the environmental studies carried out in connection with the Environmental Impact Assessment (EIA) and the baseline and monitoring programmes at the two sites. The descriptions of the programmes are based on extracts from the individual annual reports. Detailed information on methods, programmes and conclusions can be found in these reports. This review report is divided into two parts. The first part contains a description of the potential environmentally impacts of offshore wind farms and the potentially affected part of the environment. The second part includes a description of Horns Rev and Nysted Offshore Wind Farm and the environmental studies carried out here until the end of 2003. Appendix I is a list of the literature published on the studies carried out at Hors Rev and Nysted Offshore Wind Farm. Appendix II is a list of some of the literature relevant to the demonstration projects but not directly related to the projects. The offshore wind farm situated at the bdsand area is officially denoted Nysted Offshore Wind Farm, and in the present report the denotation 'Nysted' will be used as well when referring to Nysted Offshore Wind Farm. The denotation Roedsand will be used when referring to the actual area Roedsand. (au)
Energy Technology Data Exchange (ETDEWEB)
NONE
2005-10-15
The present review report presents the two wind farms Horns Rev and Nysted with regard to environmental characteristics and the results of the environmental studies carried out in connection with the Environmental Impact Assessment (EIA) and the baseline and monitoring programmes at the two sites. The descriptions of the programmes are based on extracts from the individual annual reports. Detailed information on method, programmes and conclusions can be found in these reports (see Appendix 1). This review report is divided into two parts. The first part contains a description of the potential environmental impacts of offshore wind farms and the potentially affected part of the environment. The second part includes a description of Horns Rev and Nysted Offshore Wind Farm and the environmental studies carried out here until the end of 2003. Appendix I is a list of the literature published on the studies carried out at Horns Rev and Nysted Offshore Wind Farm. Appendix II is a list of some of the literature relevant to the demonstration projects but not directly related to the projects. The offshore wind farm situated in the Roedsand area is officially denoted Nysted Offshore Wind Farm, and in the present report the denotation 'Nysted' will be used as well when referring to Nysted Offshore Wind Farm. The denotation Roedsand will be used when referring to the actual area Roedsand. (au)
Economic Development Impacts of Community Wind Projects. A Review and Empirical Evaluation
Energy Technology Data Exchange (ETDEWEB)
Lantz, E. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Tegen, S. [National Renewable Energy Lab. (NREL), Golden, CO (United States)
2009-04-01
"Community wind" refers to a class of wind energy ownership structures. The extent of local ownership may range from a small minority share to full ownership by persons in the immediate area surrounding the wind project site. Potential project owners include local farmers, businesses, Native American tribes, universities, cooperatives, or any other local entity seeking to invest in wind energy. The opposite of community wind is an "absentee" project, in which ownership is completely removed from the state and community surrounding the facility. Thus, there is little or no ongoing direct financial benefit to state and local populations aside from salaries for local repair technicians, local property tax payments, and land lease payments. In recent years, the community wind sector has been inhibited by manufacturers' preference for larger turbine orders. This often puts smaller community wind developers and projects at a competitive disadvantage. However, state policies specifically supporting community wind may become a more influential market factor as turbines are now more readily available given manufacturer ramp-ups and the slow-down in the industry that has accompanied the recent economic and financial crises. This report examines existing literature to provide an overview of economic impacts resulting from community wind projects, compares results, and explains variability.
Project SAIL: An Evaluation of a Dropout Prevention Program.
Thompson, John L.; And Others
Project SAIL (Student Advocates Inspire Learning) is a Title IV-C Project located in Hopkins, Minnesota, designed to prevent students from dropping out of school by keeping them successfully involved in the mainstream environment. This study presents a review of other dropout prevention approaches, describes the intervention strategies involved in…
Electricity sector human resources review
Energy Technology Data Exchange (ETDEWEB)
Facette, J. [Canadian Association of Technicians and Technologists (Canada)
2005-07-01
The electricity industry is expanding, with new supply and infrastructure development equivalent to 35 per cent of existing capacity over the next 20 years. This paper examines the preliminary results of a human resources sector review providing industry specific labor force data. The key objectives of the review were to develop detailed industry profiles, identify root causes of human resources issues, identify industry best practices and develop a human resources strategy for the Canadian electricity sector. Estimates of current employment were provided, with age of employees, retirement projections, regional projections and estimated supply/demand gaps. Current shortages were identified, including wind energy technicians. The paper also identified a declining Canadian born labor force and a concurrent dependence on immigrants. A project research methodology was provided with a list of participating major employers. tabs., figs.
Bundles over Quantum RealWeighted Projective Spaces
Directory of Open Access Journals (Sweden)
Tomasz Brzeziński
2012-09-01
Full Text Available The algebraic approach to bundles in non-commutative geometry and the definition of quantum real weighted projective spaces are reviewed. Principal U(1-bundles over quantum real weighted projective spaces are constructed. As the spaces in question fall into two separate classes, the negative or odd class that generalises quantum real projective planes and the positive or even class that generalises the quantum disc, so do the constructed principal bundles. In the negative case the principal bundle is proven to be non-trivial and associated projective modules are described. In the positive case the principal bundles turn out to be trivial, and so all the associated modules are free. It is also shown that the circle (coactions on the quantum Seifert manifold that define quantum real weighted projective spaces are almost free.
Hood River Monitoring and Evaluation Project, Annual Report 2002-2003.
Energy Technology Data Exchange (ETDEWEB)
Vaivoda, Alexis
2004-02-01
The Hood River Production Program Monitoring and Evaluation Project is co-managed by the Confederated Tribes of Warm Springs (CTWSRO) and the Oregon Department of Fish and Wildlife. The program is divided up to share responsibilities, provide efficiency, and avoid duplication. From October 2002 to September 2003 (FY 03) project strategies were implemented to monitor, protect, and restore anadromous fish and fish habitat in the Hood River subbasin. A description of the progress during FY 03 is reported here. Additionally an independent review of the entire program was completed in 2003. The purpose of the review was to determine if project goals and actions were achieved, look at critical uncertainties for present and future actions, determine cost effectiveness, and choose remedies that would increase program success. There were some immediate changes to the implementation of the project, but the bulk of the recommendations will be realized in coming years.
[Managing digital medical imaging projects in healthcare services: lessons learned].
Rojas de la Escalera, D
2013-01-01
Medical imaging is one of the most important diagnostic instruments in clinical practice. The technological development of digital medical imaging has enabled healthcare services to undertake large scale projects that require the participation and collaboration of many professionals of varied backgrounds and interests as well as substantial investments in infrastructures. Rather than focusing on systems for dealing with digital medical images, this article deals with the management of projects for implementing these systems, reviewing various organizational, technological, and human factors that are critical to ensure the success of these projects and to guarantee the compatibility and integration of digital medical imaging systems with other health information systems. To this end, the author relates several lessons learned from a review of the literature and the author's own experience in the technical coordination of digital medical imaging projects. Copyright © 2012 SERAM. Published by Elsevier Espana. All rights reserved.
Environmental Measurements Laboratory program review, December 1983
International Nuclear Information System (INIS)
Volchok, H.L.; de Planque, G.
1984-03-01
This volume contains all of the written material that was submitted to the panel of Reviewers in advance of a Program Review conducted by the US Department of Energy, Office of Health and Environmental Research at the Environmental Measurements Laboratory (EML) December 7-9, 1983. In addition to a general introduction there are nineteen papers grouped into the five broad program categories covering all of the scientific and engineering projects of the Laboratory: Natural Radioactivity and Radiation, Anthropogenic Radioactivity and Radiation, Non-nuclear, Quality Assurance, and Development and Support. These short articles, for the most part, focus on the rationale for EML's involvement in each project, emphasizing their relevance to the EML and Department of Energy missions. Project results and their interpretation were presented at the Review and can be found in the material referenced in this volume
7 CFR 1942.105 - Environmental review.
2010-01-01
... 7 Agriculture 13 2010-01-01 2009-01-01 true Environmental review. 1942.105 Section 1942.105... § 1942.105 Environmental review. FmHA or its successor agency under Public Law 103-354 must conduct and document an environmental review for each proposed project in accordance with subpart G of part 1940 of...
75 FR 4062 - Peer Review Best Practices Workshop
2010-01-26
... DEPARTMENT OF ENERGY Peer Review Best Practices Workshop AGENCY: Department of Energy, Office of..., demonstration and deployment programs and has used a variety of peer review approaches to select the best...'' for reviewing and selecting project proposals. The workshop will explore classic peer review processes...
Wheeler, Patricia; And Others
This formative review of a project designed to help high school students become more discriminating television viewers (1) presents a description of the curriculum designed during the project to foster critical television viewing in teenagers, (2) outlines the major tasks involved in the formative review of the curriculum, and (3) presents and…
Environmental review process: The U.S. experience
International Nuclear Information System (INIS)
Russo, T.N.
1993-01-01
The environmental review process used by the United States Federal Energy Regulatory Commission was discussed. The process has enabled the Commission to assess proposed small hydropower projects, but in the view of the author the Commission has done so at considerable cost and time to developers. Principal reasons for the delays and additional costs were examined, and ways were suggested that developers, agencies, regulators and other stakeholders could facilitate the siting of small hydropower projects without sacrificing the quality of the environmental review process. The highly duplicative nature of the environmental review process for hydropower projects was highlighted. The Commissions's power to regulate hydropower was claimed to have become severely eroded and the Energy Policy Act of 1992 did not significantly improve the process. Conflicts between developers, federal and state agencies, and the Commission over jurisdiction and interpretation of statutes continue to cause siting delays, which could render many projects financially infeasible. A more proactive Federal Energy Regulatory Commission was suggested to work with developers, agencies, Indian tribes and non-government organizations to resolve disputes. 1 tab
Phebus FP: organisation of the project and international collaboration
International Nuclear Information System (INIS)
Tattegrain, A.; Hardt, P. von der
1992-01-01
PHEBUS Fission Product (FP) Research Programme developed from the initial French design study into a European project, and further into an international programme by agreements with overseas partners during the past two years. The programme is supervised by a Steering Committee which reviews the technical-scientific options and the results. The executive body under the Committee, the Project Group, includes a Commissariat a l'Energie Atomique (CEA) and Commission of the European Communities (CEC) manager as well as three (CEA) project leaders for design and manufacture, experiment operation, and interpretation of test results. The Steering Committee can request expertise from the two working groups the Analytical Group (SAWG) (elaborating test objectives, carrying out reactor calculations and test precalculations) and the Technical Group (TG) (assessing the designs proposed and the results obtained by the Project Group). A third group looks into financial aspects of the CEA-CEC contract only. The two working groups, SAWG and TG, play an important role in the exchange of information and of expertise between all partners. The paper reviews the internal Project organisation and the collaboration network, inside the European Community and through CEA overseas. (author)
User's operating procedures. Volume 1: Scout project information programs
Harris, C. G.; Harris, D. K.
1985-01-01
A review of the user's operating procedures for the Scout Project Automatic Data System, called SPADS is given. SPADS is the result of the past seven years of software development on a Prime minicomputer located at the Scout Project Office. SPADS was developed as a single entry, multiple cross reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. The instructions to operate the Scout Project Information programs in data retrieval and file maintenance via the user friendly menu drivers is presented.
Independent management and financial review, Yucca Mountain Project, Nevada. Final report, Appendix
International Nuclear Information System (INIS)
1995-01-01
The Nuclear Waste Policy Act of 1982 (Public Law 97-425), as amended by Public Law 100-203, December 22, 1987, established the Office of Civilian Radioactive Waste Management (OCRWM) within the Department of Energy (DOE), and directed the Office to investigate a site at Yucca Mountain, Nevada, to determine if this site is suitable for the construction of a repository for the disposal of high level nuclear waste. Work on site characterization has been under way for several years. Thus far, about $1.47 billion have been spent on Yucca Mountain programs. This work has been funded by Congressional appropriations from a Nuclear Waste Fund to which contributions have been made by electric utility ratepayers through electric utilities generating power from nuclear power stations. The Secretary of Energy and the Governor of the State of Nevada have appointed one person each to a panel to oversee an objective, independent financial and management evaluation of the Yucca Mountain Project. The Requirements for the work will include an analysis of (1) the Yucca Mountain financial and, contract management techniques and controls; (2) Project schedules and credibility of the proposed milestones; (3) Project organizational effectiveness and internal planning processes, and (4) adequacy of funding levels and funding priorities, including the cost of infrastructure and scientific studies. The recipient will provide monthly progress report and the following reports/documents will be presented as deliverables under the contract: (1) Financial and Contract Management Preliminary Report; (2) Project Scheduling Preliminary Report; (3)Project Organizational Effectiveness Preliminary Report; (4) Project Funding Levels and Funding Priorities Preliminary Report; and (5) Final Report
Independent management and financial review, Yucca Mountain Project, Nevada. Final report, Appendix
Energy Technology Data Exchange (ETDEWEB)
NONE
1995-07-15
The Nuclear Waste Policy Act of 1982 (Public Law 97-425), as amended by Public Law 100-203, December 22, 1987, established the Office of Civilian Radioactive Waste Management (OCRWM) within the Department of Energy (DOE), and directed the Office to investigate a site at Yucca Mountain, Nevada, to determine if this site is suitable for the construction of a repository for the disposal of high level nuclear waste. Work on site characterization has been under way for several years. Thus far, about $1.47 billion have been spent on Yucca Mountain programs. This work has been funded by Congressional appropriations from a Nuclear Waste Fund to which contributions have been made by electric utility ratepayers through electric utilities generating power from nuclear power stations. The Secretary of Energy and the Governor of the State of Nevada have appointed one person each to a panel to oversee an objective, independent financial and management evaluation of the Yucca Mountain Project. The Requirements for the work will include an analysis of (1) the Yucca Mountain financial and, contract management techniques and controls; (2) Project schedules and credibility of the proposed milestones; (3) Project organizational effectiveness and internal planning processes, and (4) adequacy of funding levels and funding priorities, including the cost of infrastructure and scientific studies. The recipient will provide monthly progress report and the following reports/documents will be presented as deliverables under the contract: (1) Financial and Contract Management Preliminary Report; (2) Project Scheduling Preliminary Report; (3)Project Organizational Effectiveness Preliminary Report; (4) Project Funding Levels and Funding Priorities Preliminary Report; and (5) Final Report.
Spent Nuclear Fuel Project dose management plan
International Nuclear Information System (INIS)
Bergsman, K.H.
1996-03-01
This dose management plan facilitates meeting the dose management and ALARA requirements applicable to the design activities of the Spent Nuclear Fuel Project, and establishes consistency of information used by multiple subprojects in ALARA evaluations. The method for meeting the ALARA requirements applicable to facility designs involves two components. The first is each Spent Nuclear Fuel Project subproject incorporating ALARA principles, ALARA design optimizations, and ALARA design reviews throughout the design of facilities and equipment. The second component is the Spent Nuclear Fuel Project management providing overall dose management guidance to the subprojects and oversight of the subproject dose management efforts
U.S. LCI Database Project--Final Phase I Report
Energy Technology Data Exchange (ETDEWEB)
2003-08-01
This Phase I final report reviews the process and provides a plan for the execution of subsequent phases of the database project, including recommended data development priorities and a preliminary cost estimate. The ultimate goal of the project is to develop publicly available LCI Data modules for commonly used materials, products, and processes.
Performance assessment: a peer review
International Nuclear Information System (INIS)
Lieberman, J.A.; Lee, W.W.L.
1986-01-01
This paper describes the rationale, membership, operation and major observations of the Performance Assessment National Review Group. The Group was assembled by Weston at the request of the US Department of Energy Office of Civilian Radioactive Waste Management to review performance assessment work in the US basalt, salt and tuff repository projects. The purposes were to evaluate the adequacy of the current methods, identify deficiencies, and suggest potential improvement on repository performance assessment. To perform the review, Weston retained a group of distinguished consultants who have had extensive experience in disciplines pertinent to management of radioactive wastes including mathematical modeling of fluid transport. Topics reviewed included flow and transport, source term and uncertainty analysis. While the emphasis was on methodologies, the Projects were specifically requested to show currently available results so that the way they utilized familiar methodologies could be evaluated. This paper will highlight some of the technical observations of the Group as well as some managerial and institutional issues
Sex Differences in Objective and Projective Dependency Tests: A Meta-Analytic Review.
Bornstein, Robert F.
1995-01-01
A meta-analysis of 97 studies published since 1950 that assessed sex differences in scores on objective and projective dependency tests indicated that women consistently obtained higher dependency scores on objective tests, and men obtained higher scores on projective tests. Findings are discussed in terms of sex role socialization. (SLD)
Spent nuclear fuel Canister Storage Building CDR Review Committee report
International Nuclear Information System (INIS)
Dana, W.P.
1995-12-01
The Canister Storage Building (CSB) is a subproject under the Spent Nuclear Fuels Major System Acquisition. This subproject is necessary to design and construct a facility capable of providing dry storage of repackaged spent fuels received from K Basins. The CSB project completed a Conceptual Design Report (CDR) implementing current project requirements. A Design Review Committee was established to review the CDR. This document is the final report summarizing that review
The machine intelligence Hex project
Chalup, Stephan K.; Mellor, Drew; Rosamond, Fran
2005-12-01
Hex is a challenging strategy board game for two players. To enhance students’ progress in acquiring understanding and practical experience with complex machine intelligence and programming concepts we developed the Machine Intelligence Hex (MIHex) project. The associated undergraduate student assignment is about designing and implementing Hex players and evaluating them in an automated tournament of all programs developed by the class. This article surveys educational aspects of the MIHex project. Additionally, fundamental techniques for game programming as well as specific concepts for Hex board evaluation are reviewed. The MIHex game server and possibilities of tournament organisation are described. We summarise and discuss our experiences from running the MIHex project assignment over four consecutive years. The impact on student motivation and learning benefits are evaluated using questionnaires and interviews.
International Nuclear Information System (INIS)
1996-01-01
This second volume of a major study conducted for the United Kingdom Department of Trade and Industry aims to review financing mechanisms and incentives for the commercialisation of renewable energy projects. The countries included in this volume present case studies from countries identified as having particularly interesting current or past policies for the development and commercialisation of renewable energy technologies, namely Austria, Denmark, Germany, Greece, India, The Netherlands, Spain and two states in the United States of America. Data is presented on key facts, energy issues and organizations as well as energy and environmental policy for each country. The electricity supply industry, possibilities for renewable energy development, and incentive mechanisms in appropriate areas for development are also described for each country. (UK)
Requirements for the project management in the client / engineering contractor relationship
International Nuclear Information System (INIS)
Hack, W.L.
1995-01-01
Investment projects impose a multitude of requirements upon clients and engineering contractors to cope with the management of project inherent conflicts. The paper reviews certain aspects on why such conflicts develop, and how they may be resolved. (orig.)
Managing project risks and uncertainties
Directory of Open Access Journals (Sweden)
Mike Mentis
2015-01-01
Full Text Available This article considers threats to a project slipping on budget, schedule and fit-for-purpose. Threat is used here as the collective for risks (quantifiable bad things that can happen and uncertainties (poorly or not quantifiable bad possible events. Based on experience with projects in developing countries this review considers that (a project slippage is due to uncertainties rather than risks, (b while eventuation of some bad things is beyond control, managed execution and oversight are still the primary means to keeping within budget, on time and fit-for-purpose, (c improving project delivery is less about bigger and more complex and more about coordinated focus, effectiveness and developing thought-out heuristics, and (d projects take longer and cost more partly because threat identification is inaccurate, the scope of identified threats is too narrow, and the threat assessment product is not integrated into overall project decision-making and execution. Almost by definition, what is poorly known is likely to cause problems. Yet it is not just the unquantifiability and intangibility of uncertainties causing project slippage, but that they are insufficiently taken into account in project planning and execution that cause budget and time overruns. Improving project performance requires purpose-driven and managed deployment of scarce seasoned professionals. This can be aided with independent oversight by deeply experienced panelists who contribute technical insights and can potentially show that diligence is seen to be done.
Review and Update Project Design, Work Plan and Activities for 2009 and Beyond
International Nuclear Information System (INIS)
Edward, M.
2009-01-01
A multi year ongoing project, previously approved by Board of Governors (BOG) that is implemented according to the already approved objectives/outcomes and time frame. All projects have time frame in line with the stated objectives and work plans, of maximum of five years. If rephasing is necessary due to dealys in implementation, the project duration can be extended by up to one year, maintaining the original objectives/outcomes
Measuring the socio-economic impacts of agroforestry projects in the Philippines
Evan Mercer; Belita Vega; Hermie Francisco; Robin Maille
1994-01-01
Conventional wisdom suggests that agroforestry projects can provide both ecological and economic benefits. Most agroforestry project evaluations, however, have failed to adequately assess the soci0-economic impacts. For example, a review of 108 agroforestry project impact evaluations by Sara Scherr of IFPRJ reported that only 8% assessed economic costs or benefits, 5%...
pep-up: a review of the umgeni valley pro.ject evaluation process
African Journals Online (AJOL)
The evaluation process at the Umgeni Valle~ Project is.described. Its evolution, background and ... mental Education circles in Southern Africa. The ... t? the percei~ed need for evaluation of the Umgen1 Valley ProJect. ... This group, insisting that they were facilitating .... Phase : An integrated summary of all fielc and working ...
Tampa electric company - IGCC project. Quarterly report, January 1, 1996--March 31, 1996
Energy Technology Data Exchange (ETDEWEB)
NONE
1998-02-01
This quarterly report consists of materials presented at a recent review of the project. The project is an IGCC project being conducted by Tampa Electric Company. The report describes the status of the facility construction, components, operations staff training, and discusses aspects of the project which may impact the final scheduled completion.
An introduction to finite projective planes
Albert, Abraham Adrian
2015-01-01
Geared toward both beginning and advanced undergraduate and graduate students, this self-contained treatment offers an elementary approach to finite projective planes. Following a review of the basics of projective geometry, the text examines finite planes, field planes, and coordinates in an arbitrary plane. Additional topics include central collineations and the little Desargues' property, the fundamental theorem, and examples of finite non-Desarguesian planes.Virtually no knowledge or sophistication on the part of the student is assumed, and every algebraic system that arises is defined and
Directory of Open Access Journals (Sweden)
Gordana ŽURGA
2018-02-01
Full Text Available The purpose of the article is to present the importance of project management for the functioning of public administration, and its contribution to the realization of the developmental goals of the government. For this, integration of strategic management and project management is of vital importance. The methodology used is a combination of literature review, a case study of project management in public administration of the Republic of Slovenia, and development of a maturity model of project management in public administration, with its verifi cation on the case of Slovenia. The main contribution of the study is development of TPM – Total Project Management maturity model for public administration. Upon the TPM maturity model, project management in Slovene public administration is assessed and discussed. Out of fi ve maturity levels, the results for project management in Slovene public administration are: management of projects – level 2 (initiated, management of programs of projects – level 2 (initiated, management of portfolios of projects – level 3 (implemented, organizational support for project management – level 3 (implemented, HRM for project management – level 2 (initiated, and integration of project management and strategic management – level 3 (implemented. General fi ndings and recommendations in this respect are drawn, together with indicated areas for possible further research and investigation.
Diagnostic framework and health check tool for engineering and technology projects
Directory of Open Access Journals (Sweden)
Simon P Philbin
2014-10-01
Full Text Available Purpose: Development of a practitioner oriented diagnostic framework and health check tool to support the robust assessment of engineering and technology projects.Design/methodology/approach: The research is based on a literature review that draws together insights on project assessment and critical success factors to establish an integrated systems view of projects. This is extended to allow a comprehensive diagnostic framework to be developed along with a high-level health check tool that can be readily deployed on projects. The utility of the diagnostic framework and health check tool are explored through three illustrative case studies, with two from Canada and one from the United Kingdom. Findings andOriginality/value: The performance of engineering and technology projects can be viewed through a systems perspective and being a function of six sub-systems that are: process, technology, resources, impact, knowledge and culture. The diagnostic framework that is developed through this research integrates these sub-systems to provide a comprehensive assessment methodology for projects, which is linked to existing best practice for project reviews, performance management and maturity models. The case studies provide managerial insights that are related to the diagnostic framework but crucially also position the approach in the context of industrial applications for construction engineering and technology management.Research limitations/implications: The case study approach includes two case studies from the construction and facilities development sector with the third case study from the research and technology sector. Further work is required to investigate the use of the diagnostic framework and health check tool in other sectors.Practical implications: The health check tool will be of practical benefit to new projects managers that require access to a robust and convenient project review methodology for assessing the status and health of a
76 FR 2950 - Notice of Limitation on Claims Against Proposed Public Transportation Projects
2011-01-18
... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation projects will be... final agency actions by issuing certain approvals for the public transportation projects listed below...
75 FR 13335 - Notice of Limitation on Claims Against Proposed Public Transportation Projects
2010-03-19
... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation projects will be... FTA has taken final agency actions by issuing certain approvals for the public transportation projects...
77 FR 322 - Notice of Limitation on Claims Against Proposed Public Transportation Projects
2012-01-04
... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation project will be... FTA has taken final agency actions by issuing certain approvals for the public transportation projects...
75 FR 71181 - Notice of Limitation on Claims Against Proposed Public Transportation Projects
2010-11-22
... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation projects will be... issuing certain approvals for the public transportation projects listed below. The actions on these...
Project Progress Assessment Report (PPAR) 2015
International Nuclear Information System (INIS)
Sall, Baba
2015-01-01
This evaluation reports reviews basic information, output achievement, equipment and human resources, comment and recommendations. It highlights outputs Fully achieved, those which are partially achieved or in progress and also non achieved outputs. Regarding comments and lessons learned, counterpart stated that the overall timeline of the project is respected, even if activities are delayed to adapt to technical, financial and human resources constraints. The results obtained are in line with expectations thanks to a rigorously respected scientific approach. The Collegial Coordination of the project (DSV-LNERV-CIRAD) and the TO are in phase on the conduct of the Project the collection of baseline data is a crucial phase in the implementation of tsetse control programs. It makes it possible to implement a good strategy. The scientific and technical rigor and the good atmosphere within the Project team are also to be retained.
Project Progress Assessment Report (PPAR) 2012
International Nuclear Information System (INIS)
Sall, Baba
2012-01-01
This evaluation reports reviews basic information, output achievement, equipment and human resources, comment and recommendations. It highlights outputs Fully achieved, those which are partially achieved or in progress and also non achieved outputs. Regarding comments and lessons learned, counterpart stated that the overall timeline of the project is respected, even if activities are delayed to adapt to technical, financial and human resources constraints. The results obtained are in line with expectations thanks to a rigorously respected scientific approach. The Collegial Coordination of the project (DSV-LNERV-CIRAD) and the TO are in phase on the conduct of the Project the collection of baseline data is a crucial phase in the implementation of tsetse control programs. It makes it possible to implement a good strategy. The scientific and technical rigor and the good atmosphere within the Project team are also to be retained.
The ALPHA project: A progress report
International Nuclear Information System (INIS)
Yadigaroglu, G.
1995-01-01
A review of the ALPHA project is presented, including a summary of progress and current status. The project comprises the experimental and analytical investigation of the long-term decay heat removal phenomena from the containment of the next generation of passive Advanced Light Water Reactors. In its present phase, the project is directed to the investigation of the Simplified Boiling Water Reactor (SBWR) Passive Containment Cooling system. The project includes separate-effects tests of containment phenomena (the LINX program). The effects of aerosols that may result from hypothetical severe accidents are also considered (the AIDA program). The construction and commissioning of the major ALPHA experimental facilities, PANDA, LINX-2 and AIDA is complete and the first series of tests are underway. Scaling studies have guided their design. Several small-scale experiments and studies have already produced valuable results
The Expanded Very Large Array Project
Perley, Rick
2012-10-01
The Expanded Very Large Array Project, begun in 2001, is now completed -- on time, on budget, and ``on spec.'' The major goal of the project was to multiply the key observational capabilities of the Very Large Array -- the world's most powerful, versatile, and productive radio telescope -- by a factor of at least an order of magnitude by implementation of modern technologies. The result of the project is an operationally new telescope -- renamed the Jansky Very Large Array -- which is capable of new science unimagined in 1980, when the original VLA was completed. In this talk, I will review the goals of the project, and describe the new capabilities of the Jansky Very Large Array. Already, the array is providing fabulous new insights into the physics of the universe,and I will spend the majority of the time describing examples of new results.
California Hydrogen Infrastructure Project
Energy Technology Data Exchange (ETDEWEB)
Heydorn, Edward C
2013-03-12
Air Products and Chemicals, Inc. has completed a comprehensive, multiyear project to demonstrate a hydrogen infrastructure in California. The specific primary objective of the project was to demonstrate a model of a real-world retail hydrogen infrastructure and acquire sufficient data within the project to assess the feasibility of achieving the nation's hydrogen infrastructure goals. The project helped to advance hydrogen station technology, including the vehicle-to-station fueling interface, through consumer experiences and feedback. By encompassing a variety of fuel cell vehicles, customer profiles and fueling experiences, this project was able to obtain a complete portrait of real market needs. The project also opened its stations to other qualified vehicle providers at the appropriate time to promote widespread use and gain even broader public understanding of a hydrogen infrastructure. The project engaged major energy companies to provide a fueling experience similar to traditional gasoline station sites to foster public acceptance of hydrogen. Work over the course of the project was focused in multiple areas. With respect to the equipment needed, technical design specifications (including both safety and operational considerations) were written, reviewed, and finalized. After finalizing individual equipment designs, complete station designs were started including process flow diagrams and systems safety reviews. Material quotes were obtained, and in some cases, depending on the project status and the lead time, equipment was placed on order and fabrication began. Consideration was given for expected vehicle usage and station capacity, standard features needed, and the ability to upgrade the station at a later date. In parallel with work on the equipment, discussions were started with various vehicle manufacturers to identify vehicle demand (short- and long-term needs). Discussions included identifying potential areas most suited for hydrogen fueling
Summary results of an assessment of research projects in the Nuclear Medicine Research program
International Nuclear Information System (INIS)
1988-01-01
In May 1987, OHER management requested the Office of Program Analysis (OPA) to conduct a peer review of the projects of the DOE Nuclear Medicine Research program. This was done using procedures and a quantitative methodology OPA developed for assessing DOE research programs. Sixty-three individual nuclear medicine projects were reviewed by seven panels; one panel on isotopes and radioisotopes, three on radiopharmacology, two on clinical feasibility, and one on instrumentation. Each panel consisted of five to ten knowledgeable reviewers. 5 figs
The third phase of the OECD/NEA TDB project: TDB III
International Nuclear Information System (INIS)
Mompean, F.J.; Illemassene, M.; Perrone, J.
2005-01-01
In 2003 with a foreseen duration of four years. The main objective of this new phase is to extend the existing critically reviewed database for elements of relevance in radioactive waste management, paying attention to the needs of the various national programmes. Following the decision by the Project Management Board (integrated by representatives of 16 organisations with responsibilities in radioactive waste management in 12 OECD member countries) the elements contemplated in this new phase are Th, Sn and Fe, with a higher priority being allocated to inorganic species and compounds. In addition to the corresponding review teams for these elements, an additional expert team has been constituted to prepare guidelines for the evaluation of thermodynamic data for solid solutions. As was the case in TDB Phase II, the basic project review methodology remains unaltered in TDB III. The Figure illustrates the relationship between the various TDB bodies, with an International Organisation, the OECD NEA, acting as Project Coordinator and linking the independent scientific teams and the project governing bodies. This organizational paradigm has proven successful with the recent completion of the five Phase II Reviews (Update, Ni, Se, Zr and Organic Ligands). The review and expert team activities were started in 2004 (except for Fe, being started in 2005) following an initiation stage. This preliminary stage was designed in order to tailor the team compositions to the existing literature for each element. The first reviews stemming from TDB III are scheduled to appear in published form in 2007. The successful completion of these objectives will add three further reports to the current series of nine volumes (dealing with the chemical thermodynamics of U, Np, Pu, Am, Tc, Ni, Se, Zr and compounds and complexes of these elements with oxalate, citrate, EDTA and isa). (authors)
DOE Hydrogen Program 2004 Annual Merit Review and Peer Evaluation Report
Energy Technology Data Exchange (ETDEWEB)
2004-10-01
This document summarizes the project evaluations and comments from the DOE Hydrogen Program 2004 Annual Program Review. Hydrogen production, delivery and storage; fuel cells; technology validation; safety, codes and standards; and education R&D projects funded by DOE in FY2004 are reviewed.
Energy Technology Data Exchange (ETDEWEB)
NONE
1997-10-01
Approximately 30 research projects are summarized in this report. Title of the project, contract number, company or university, award amount, principal investigators, objectives, and summary of technical progress are given for each project. Enhanced oil recovery projects include chemical flooding, gas displacement, and thermal recovery. Most of the research projects though are related to geoscience technology and reservoir characterization.
FDH radiological design review guidelines
International Nuclear Information System (INIS)
Millsap, W.J.
1998-01-01
These guidelines discuss in more detail the radiological design review process used by the Project Hanford Management Contractors as described in HNF-PRO-1622, Radiological Design Review Process. They are intended to supplement the procedure by providing background information on the design review process and providing a ready source of information to design reviewers. The guidelines are not intended to contain all the information in the procedure, but at points, in order to maintain continuity, they contain some of the same information
FDH radiological design review guidelines
Energy Technology Data Exchange (ETDEWEB)
Millsap, W.J.
1998-09-29
These guidelines discuss in more detail the radiological design review process used by the Project Hanford Management Contractors as described in HNF-PRO-1622, Radiological Design Review Process. They are intended to supplement the procedure by providing background information on the design review process and providing a ready source of information to design reviewers. The guidelines are not intended to contain all the information in the procedure, but at points, in order to maintain continuity, they contain some of the same information.
Testing Software Development Project Productivity Model
Lipkin, Ilya
Software development is an increasingly influential factor in today's business environment, and a major issue affecting software development is how an organization estimates projects. If the organization underestimates cost, schedule, and quality requirements, the end results will not meet customer needs. On the other hand, if the organization overestimates these criteria, resources that could have been used more profitably will be wasted. There is no accurate model or measure available that can guide an organization in a quest for software development, with existing estimation models often underestimating software development efforts as much as 500 to 600 percent. To address this issue, existing models usually are calibrated using local data with a small sample size, with resulting estimates not offering improved cost analysis. This study presents a conceptual model for accurately estimating software development, based on an extensive literature review and theoretical analysis based on Sociotechnical Systems (STS) theory. The conceptual model serves as a solution to bridge organizational and technological factors and is validated using an empirical dataset provided by the DoD. Practical implications of this study allow for practitioners to concentrate on specific constructs of interest that provide the best value for the least amount of time. This study outlines key contributing constructs that are unique for Software Size E-SLOC, Man-hours Spent, and Quality of the Product, those constructs having the largest contribution to project productivity. This study discusses customer characteristics and provides a framework for a simplified project analysis for source selection evaluation and audit task reviews for the customers and suppliers. Theoretical contributions of this study provide an initial theory-based hypothesized project productivity model that can be used as a generic overall model across several application domains such as IT, Command and Control
RAMESES publication standards: meta-narrative reviews
Directory of Open Access Journals (Sweden)
Wong Geoff
2013-01-01
Full Text Available Abstract Background Meta-narrative review is one of an emerging menu of new approaches to qualitative and mixed-method systematic review. A meta-narrative review seeks to illuminate a heterogeneous topic area by highlighting the contrasting and complementary ways in which researchers have studied the same or a similar topic. No previous publication standards exist for the reporting of meta-narrative reviews. This publication standard was developed as part of the RAMESES (Realist And MEta-narrative Evidence Syntheses: Evolving Standards project. The project's aim is to produce preliminary publication standards for meta-narrative reviews. Methods We (a collated and summarized existing literature on the principles of good practice in meta-narrative reviews; (b considered the extent to which these principles had been followed by published reviews, thereby identifying how rigor may be lost and how existing methods could be improved; (c used a three-round online Delphi method with an interdisciplinary panel of national and international experts in evidence synthesis, meta-narrative reviews, policy and/or publishing to produce and iteratively refine a draft set of methodological steps and publication standards; (d provided real-time support to ongoing meta-narrative reviews and the open-access RAMESES online discussion list so as to capture problems and questions as they arose; and (e synthesized expert input, evidence review and real-time problem analysis into a definitive set of standards. Results We identified nine published meta-narrative reviews, provided real-time support to four ongoing reviews and captured questions raised in the RAMESES discussion list. Through analysis and discussion within the project team, we summarized the published literature, and common questions and challenges into briefing materials for the Delphi panel, comprising 33 members. Within three rounds this panel had reached consensus on 20 key publication standards, with an
Engineering for new-built nuclear power plant projects
International Nuclear Information System (INIS)
Gonzalez Lopez, A.
2012-01-01
This article reviews the opportunities existing in the market (electrical utilities and reactor vendors) for an engineering company with the profile of Empresarios Agrupados (EA) in new-built nuclear power plant projects. To do this, reference is made to some representative examples of projects in which EA has been participating recently. the article concludes sharing with the reader some lessons learned from this participation. (Author)
78 FR 21414 - Central Valley Project Improvement Act, Water Management Plans
2013-04-10
... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review... establish and administer an office on Central Valley Project water conservation best management practices...
78 FR 63491 - Central Valley Project Improvement Act, Water Management Plans
2013-10-24
... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review: Westside... project contractors using best available cost-effective technology and best management practices.'' These...
Mobile Learning Projects - a critical analysis of the state of the art
Frohberg, D; Göth, C; Schwabe, G
2009-01-01
A brief narrative description of the journal article, document, or resource. This paper provides a critical analysis of Mobile Learning projects published before the end of 2007. The review uses a Mobile Learning framework to evaluate and categorize 102 Mobile Learning projects, and to briefly introduce exemplary projects for each category. All projects were analysed with the criteria: context, tools, control, communication, subject and objective. Although a significant number of projects hav...
Directory of Open Access Journals (Sweden)
S. A. Starovoitova
2013-06-01
Full Text Available Modern huge and world-wide known projects concerning studying of human microbial ecology and construction of probiotics, particularly: Society for Microbial Ecology and Disease, Probiotics & Health Targeted Initiative of International Science and Technology Center (TI PROBIO ISTC, Human Microbiome Project of National Institutes of Health, MetaHIT Project (Metagenomics of the Human Intestinal Tract of European Commission, Human Metabolome Project of Canadian University of Alberta and some more else were characterized in the article. Brief historical information and reference to official sites of every discussed project were given. Main goals and tasks of every project were described. Short characteristic of discussed projects and also modern accessible results of researches were given. Importance of every examined project for widening scientific knowledge in the field of human microbial ecology and also for improvement and/or for construction of modern effective probiotics on basis of human normal intestinal microflora were paid attention. Close interaction of scientific data received by realization of every discussed project was shown.
the Pathways to Resilience Project Advisory Panel
African Journals Online (AJOL)
the South African Pathways to Resilience Project, between 2008 and the present, in order to ... vice versa, and divergent objectives (e.g. building community infrastructure versus ... inadequate time and resources and associated risks. A review ...
Breakthrough Propulsion Physics Project: Project Management Methods
Millis, Marc G.
2004-01-01
To leap past the limitations of existing propulsion, the NASA Breakthrough Propulsion Physics (BPP) Project seeks further advancements in physics from which new propulsion methods can eventually be derived. Three visionary breakthroughs are sought: (1) propulsion that requires no propellant, (2) propulsion that circumvents existing speed limits, and (3) breakthrough methods of energy production to power such devices. Because these propulsion goals are presumably far from fruition, a special emphasis is to identify credible research that will make measurable progress toward these goals in the near-term. The management techniques to address this challenge are presented, with a special emphasis on the process used to review, prioritize, and select research tasks. This selection process includes these key features: (a) research tasks are constrained to only address the immediate unknowns, curious effects or critical issues, (b) reliability of assertions is more important than the implications of the assertions, which includes the practice where the reviewers judge credibility rather than feasibility, and (c) total scores are obtained by multiplying the criteria scores rather than by adding. Lessons learned and revisions planned are discussed.
Projected impacts of climate change on marine fish and fisheries
DEFF Research Database (Denmark)
Hollowed, Anne B.; Barange, Manuel; Beamish, Richard J.
2013-01-01
This paper reviews current literature on the projected effects of climate change on marine fish and shellfish, their fisheries, and fishery-dependent communities throughout the northern hemisphere. The review addresses the following issues: (i) expected impacts on ecosystem productivity and habitat......) implications for food security and associated changes; and (v) uncertainty and modelling skill assessment. Climate change will impact fish and shellfish, their fisheries, and fishery-dependent communities through a complex suite of linked processes. Integrated interdisciplinary research teams are forming...... in many regions to project these complex responses. National and international marine research organizations serve a key role in the coordination and integration of research to accelerate the production of projections of the effects of climate change on marine ecosystems and to move towards a future where...
International Nuclear Information System (INIS)
1999-02-01
BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains Appendix A of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment. This document is the Northstar Development Project, Final Project Description, Revision 1 for BPXA Northstar Project
The Missing Point Of Knowledge Management in PFI Projects
Directory of Open Access Journals (Sweden)
Kipli Kumalasari
2016-01-01
Full Text Available The Private Finance Initiative (PFI procurement model is a complex system which includes long-term commitment; customers’ satisfaction and through-life collaborative working. The projects based on this type of procurement has start from the year 1992 in the UK and year 2006 in Malaysia. Along the process, the PFI projects face few problems despite its advantages. These problem has effected the projects performance such as delay and cost overruns. It seems that the problems occurred are repeatable despite many types of research delved into solving the issues. This paper seeks, to find out the most common problems occur in PFI projects and highlights the best solution to tackle the problems. It also looks at whether similar problems occur in Malaysian construction industry. This research has summarised and critically review the literature on the repeated issues and problem in PFI projects which effect the performance of the projects in term of time, quality and money. It was found that similar problems occur and that similar suggestions were proposed. This shows that the proposed solutions have weaknesses somewhat and hence need to enhance further. This research highlighted the potential of incorporating knowledge management concept through its elements to address the problems. Finally, the paper proposes recommendations to improve the performance of PFI projects with the enhancement of knowledge management especially at the initial and planning stage up to bidding stage where the problem reviewed in the literature always occurred
Study on Top-Down Estimation Method of Software Project Planning
Institute of Scientific and Technical Information of China (English)
ZHANG Jun-guang; L(U) Ting-jie; ZHAO Yu-mei
2006-01-01
This paper studies a new software project planning method under some actual project data in order to make software project plans more effective. From the perspective of system theory, our new method regards a software project plan as an associative unit for study. During a top-down estimation of a software project, Program Evaluation and Review Technique (PERT) method and analogy method are combined to estimate its size, then effort estimation and specific schedules are obtained according to distributions of the phase effort. This allows a set of practical and feasible planning methods to be constructed. Actual data indicate that this set of methods can lead to effective software project planning.
77 FR 32628 - Columbia Gas Transmission, LLC; Notice of Environmental Onsite Review
2012-06-01
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF12-6-000] Columbia Gas Transmission, LLC; Notice of Environmental Onsite Review On June 13 and 14, 2012, the Office of Energy Projects (OEP) staff will conduct site visits of the proposed Line MB Loop Extension Project. The purpose of the onsite review is to review...
Distributed Research Project Scheduling Based on Multi-Agent Methods
Directory of Open Access Journals (Sweden)
Constanta Nicoleta Bodea
2011-01-01
Full Text Available Different project planning and scheduling approaches have been developed. The Operational Research (OR provides two major planning techniques: CPM (Critical Path Method and PERT (Program Evaluation and Review Technique. Due to projects complexity and difficulty to use classical methods, new approaches were developed. Artificial Intelligence (AI initially promoted the automatic planner concept, but model-based planning and scheduling methods emerged later on. The paper adresses the project scheduling optimization problem, when projects are seen as Complex Adaptive Systems (CAS. Taken into consideration two different approaches for project scheduling optimization: TCPSP (Time- Constrained Project Scheduling and RCPSP (Resource-Constrained Project Scheduling, the paper focuses on a multiagent implementation in MATLAB for TCSP. Using the research project as a case study, the paper includes a comparison between two multi-agent methods: Genetic Algorithm (GA and Ant Colony Algorithm (ACO.
Malheur River Wildlife Mitigation Project, Annual Report 2003.
Energy Technology Data Exchange (ETDEWEB)
Ashley, Paul
2004-01-01
proposals are subjected to a rigorous review process prior to receiving final approval. An eleven-member panel of scientists referred to as the Independent Scientific Review Panel (ISRP) examines project proposals. The ISRP recommends project approval based on scientific merit. The Bonneville Power Administration (BPA), the Columbia Basin Fish and Wildlife Authority (CBFWA), Council staff, the U.S. Fish and Wildlife Service (USFWS), the National Oceanic and Atmospheric Administration (NOAA), and subbasin groups also review project proposals to ensure each project meets regional and subbasin goals and objectives. The Program also includes a public involvement component that gives the public an opportunity to provide meaningful input on management proposals. After a thorough review, the Burns Paiute Tribe (BPT) acquired the Malheur River Mitigation Project (Project) with BPA funds to compensate, in part, for the loss of fish and wildlife resources in the Columbia and Snake River Basins and to address a portion of the mitigation goals identified in the Council's Program (NPPC 2000).