WorldWideScience

Sample records for project reviews cspr

  1. Molecular cloning and characterisation of a pathogenesis-related protein CsPR10 from Crocus sativus.

    Science.gov (United States)

    Gómez-Gómez, L; Rubio-Moraga, A; Ahrazem, O

    2011-03-01

    Plants have developed many mechanisms to protect themselves against most potential microbial pathogens and diseases. Among these mechanisms, pathogenesis-related proteins are produced as part of the active defence to prevent attack. In this study, a full-length cDNA encoding the CsPR10 protein was identified in fresh saffron stigmas (Crocus sativus). The deduced amino acid sequence from the nucleotide sequence of the coding region showed homology with PR10 proteins. The clone expressed as a protein in fusion with a GST tag produced a 47-kDa protein in E. coli. CsPR10 had ribonuclease activity, with features common to class II-type ribonucleases; its specific activity was quantified as 68.8 U·mg(-1) protein, thus falling within the range of most PR10 proteins exhibiting RNase activity. Antifungal activity of CsPR10 was assayed against Verticillium dahliae, Penicillium sp. and Fusarium oxysporum. CsPR10 inhibited only F. oxysporum growth, and antifungal potency was reflected in a IC(50) of 8.3 μm. Expression analysis showed the presence of high transcript levels in anther and tepal tissues, low levels in stigmas and roots, and no signal detected in leaves. This protein seems to be involved in the active defence response through activation of the jasmonic acid pathway. © 2010 German Botanical Society and The Royal Botanical Society of the Netherlands.

  2. ASEAN projects reviewed.

    Science.gov (United States)

    1980-01-01

    The ASEAN Population Expert Group met in Manila and was followed by a meeting of the ASEAN heads of population programs, during the period November 5-10, 1979. Heads of population programs from Indonesia, Malaysia, Singapore, Thailand, and the Philippines attended. The meetings were held to review progress-to-date on phase 1 projects and to consider the development of an expanded population program. 5 projects funded by UNFPA are reviewed in tabular form with the project, the sponsoring country, date of implementation, data analysis, and date of completion. Suggestions were made for improving and extending these projects and it was also suggested that all projects being developed and proposed should include a section on use of research. 7 new projects were proposed as phase 2 projects. The 1st, sponsored by Malaysia, deals with women in development; project 2, lead by Thailand, will investigate population movement and its effect on development; project 3, led by the Philippines, will develop and strengthen national population information systems and networks in ASEAN countries; project 4, led by Indonesia, is directed towards institutional development and exchanges of personnel; project 5, led by the Philippines, will examine population and development dynamics and the man/resources balance; project 6, led by Thailand, will develop ASEAN social indicators; and project 7, led by Indonesia and Malaysia, will make a comprehensive analysis of existing medical/health care and family planning systems. It was recommended that an executive director of the proposed ASEAN population coordination unit should be appointed to expedite the recommendations of the meeting related to preparation and submission of phase 2 project proposals.

  3. Poverty alleviation project review

    CSIR Research Space (South Africa)

    Braun, AL

    2003-01-01

    Full Text Available seven pure cashmere rams from project. EC (Emerging farmers) farmers have also received 43 upgraded cashmere rams from Dept. of Agric. EC From the plus minus 1800 goats involved in the project at least 450 kids / offspring of the improved goats have been...

  4. 18 CFR 801.4 - Project review.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Project review. 801.4 Section 801.4 Conservation of Power and Water Resources SUSQUEHANNA RIVER BASIN COMMISSION GENERAL POLICIES § 801.4 Project review. (a) The Compact provides generally that no project affecting the water...

  5. 2017 Project Peer Review Report

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2018-02-06

    This document summarizes the recommendations and evaluations provided by an independent external panel of experts at the 2017 U.S. Department of Energy Bioenergy Technologies Office's Peer Review meeting.

  6. Historical methane hydrate project review

    Science.gov (United States)

    Collett, Timothy; Bahk, Jang-Jun; Frye, Matt; Goldberg, Dave; Husebo, Jarle; Koh, Carolyn; Malone, Mitch; Shipp, Craig; Torres, Marta

    2013-01-01

    effort, the U.S. Congress enacted Public Law 106-­‐193, the Methane Hydrate Research and Development Act of 2000. This Act called for the Secretary of Energy to begin a methane hydrate research and development program in consultation with other U.S. federal agencies. At the same time a new methane hydrate research program had been launched in Japan by the Ministry of International Trade and Industry to develop plans for a methane hydrate exploratory drilling project in the Nankai Trough. Since this early start we have seen other countries including India, China, Canada, and the Republic of Korea establish large gas hydrate research and development programs. These national led efforts have also included the investment in a long list of important scientific research drilling expeditions and production test studies that have provided a wealth of information on the occurrence of methane hydrate in nature. The most notable expeditions and projects have including the following:-­‐Ocean Drilling Program Leg 164 (1995)-­‐Japan Nankai Trough Project (1999-­‐2000)-­‐Ocean Drilling Program Leg 204 (2004)-­‐Japan Tokai-­‐oki to Kumano-­‐nada Project (2004)-­‐Gulf of Mexico JIP Leg I (2005)-­‐Integrated Ocean Drilling Program Expedition 311 (2005)-­‐Malaysia Gumusut-­‐Kakap Project (2006)-­‐India NGHP Expedition 01 (2006)-­‐China GMGS Expedition 01 (2007)-­‐Republic of Korea UBGH Expedition 01 (2007)-­‐Gulf of Mexico JIP Leg II (2009)-­‐Republic of Korea UBGH Expedition 02 (2010)-­‐MH-­‐21 Nankai Trough Pre-­‐Production Expedition (2012-­‐2013)-­‐Mallik Gas Hydrate Testing Projects (1998/2002/2007-­‐2008)-­‐Alaska Mount Elbert Stratigraphic Test Well (2007)-­‐Alaska Iġnik Sikumi Methane Hydrate Production Test Well (2011-­‐2012)Research coring and seismic programs carried out by the Ocean Drilling Program (ODP) and Integrated Ocean Drilling Program (IODP), starting with the ODP Leg 164 drilling of the

  7. A review of software project testing

    Directory of Open Access Journals (Sweden)

    Jose Calvo-Manzano Villalón

    2016-03-01

    Full Text Available In this article a review of software projects based on a taxonomy project is established, allowing the development team or testing personnel to identify the tests to which the project must be subjected for validation. The taxonomy is focused on identifying software projects according to their technology. To establish the taxonomy, a development method comprised of 5 phases was applied. The developed taxonomy is comprised of 10 categories and 35 subcategories and was validated by a group of information technology (IT managers and professionals in the field of IT through the use of a survey. The results obtained from the survey are subjected to the Mann-Whitney U test, which indicates that the taxonomy is validated. The taxonomy can be implemented in development organizations with or without a testing team that provides a classification for technology projects.

  8. Maximum entropy PDF projection: A review

    Science.gov (United States)

    Baggenstoss, Paul M.

    2017-06-01

    We review maximum entropy (MaxEnt) PDF projection, a method with wide potential applications in statistical inference. The method constructs a sampling distribution for a high-dimensional vector x based on knowing the sampling distribution p(z) of a lower-dimensional feature z = T (x). Under mild conditions, the distribution p(x) having highest possible entropy among all distributions consistent with p(z) may be readily found. Furthermore, the MaxEnt p(x) may be sampled, making the approach useful in Monte Carlo methods. We review the theorem and present a case study in model order selection and classification for handwritten character recognition.

  9. Krsko periodic safety review project prioritization process

    International Nuclear Information System (INIS)

    Basic, I.; Vrbanic, I.; Spiler, J.; Lambright, J.

    2004-01-01

    Definition of a Krsko Periodic Safety Review (PSR) project is a comprehensive safety review of a plant after last ten years of operation. The objective is a verification by means of a comprehensive review using current methods that Krsko NPP remains safety when judged against current safety objectives and practices and that adequate arrangements are in place to maintain plant safety. This objective encompasses the three main criteria or goals: confirmation that the plant is as safe as originally intended, determination if there are any structures, systems or components that could limit the life of the plant in the foreseeable future, and comparison the plant against modern safety standards and to identify where improvements would be beneficial at justifiable cost. Krsko PSR project is structured in the three phases: Phase 1: Preparation of Detailed 10-years PSR Program, Phase 2: Performing of 10-years PSR Program and preparing of associated documents (2001-2003), and Phase 3: Implementation of the prioritized compensatory measures and modifications (development of associated EEAR, DMP, etc.) after agreement with the SNSA on the design, procedures and time-scales (2004-2008). This paper presents the NEK PSR results of work performed under Phase 2 focused on the ranking of safety issues and prioritization of corrective measures needed for establishing an efficient action plan. Safety issues were identified in Phase 2 during the following review processes: Periodic Safety Review (PSR) task; Krsko NPP Regulatory Compliance Program (RCP) review; Westinghouse Owner Group (WOG) catalog items screening/review; SNSA recommendations (including IAEA RAMP mission suggestions/recommendations).(author)

  10. 75 FR 36301 - Review and Approval of Projects

    Science.gov (United States)

    2010-06-25

    ... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Parts 806 and 808 Review and Approval of Projects AGENCY... document contains proposed rules that would amend the project review regulations of the Susquehanna River... the scope of withdrawals requiring review and approval; improve notice procedures for all project...

  11. 77 FR 75915 - Review and Approval of Projects

    Science.gov (United States)

    2012-12-26

    ... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Part 806 Review and Approval of Projects AGENCY... document contains proposed rules that would amend the project review regulations of the Susquehanna River... set forth in this proposed rulemaking is to make further modifications to the Commission's project...

  12. Atmospheric Ionizing Radiation (AIR) Project Review

    Science.gov (United States)

    Singleterry, R. C., Jr.; Wilson, J. W.; Whitehead, A. H.; Goldhagen, P. E.

    1999-01-01

    The National Council on Radiation Protection and Measurement (NCRP) and the National Academy of Science (NAS) established that the uncertainty in the data and models associated with the high-altitude radiation environment could and should be reduced. In response, the National Aeronautics and Space Administration (NASA) and the U.S. Department of Energy Environmental Measurements Laboratory (EML) created the Atmospheric Ionizing Radiation (AIR) Project under the auspices of the High Speed Research (HSR) Program Office at the Langley Research Center. NASA's HSR Program was developed to address the potential of a second-generation supersonic transport. A critical element focussed on the environmental issues, including the threat to crew and passengers posed by atmospheric radiation. Various international investigators were solicited to contribute instruments to fly on an ER-2 aircraft at altitudes similar to those proposed for the High Speed Civil Transport (HSCT). A list of participating investigators, their institutions, and instruments with quantities measured is presented. The flight series took place at solar minimum (radiation maximum) with northern, southern, and east/west flights. The investigators analyzed their data and presented preliminary results at the AIR Workshop in March, 1998. A review of these results are included.

  13. Field review of fish habitat improvement projects in central Idaho

    International Nuclear Information System (INIS)

    Beschta, R.L.; Griffith, J.; Wesche, T.A.

    1993-05-01

    The goal of this field review was to provide information to the Bonneville Power Administration (BPA) regarding previous and ongoing fish habitat improvement projects in central Idaho. On July 14, 1992, the review team met at the Sawtooth National Recreation Area office near Ketchum, Idaho, for a slide presentation illustrating several habitat projects during their construction phases. Following the slide presentation, the review team inspected fish habitat projects that have been implemented in the last several years in the Stanley Basin and adjacent valleys. At each site the habitat project was described to the field team and a brief period for project inspection followed. The review team visited approximately a dozen sites on the Challis, Sawtooth, and Boise National Forests over a period of approximately two and a half days. There are two objectives of this review namely to summarize observations for specific field sites and to provide overview commentary regarding the BPA habitat improvement program in central Idaho

  14. Post-project market review as a tool for stimulating commercialisation of knowledge creation projects

    NARCIS (Netherlands)

    Bout, L.Y.; Lombaers, J.H.M.; Constantinides, E.; Weerd-Nederhof, P.C. de

    2009-01-01

    Post-Project Reviews are mainly used as a tool to improve organisational learning (Busby, 1999; von Zedtwitz, 2002). However, the concept of post-project review can also be used as a tool to identify new market potential and to hand over technical knowledge from technical to marketing personnel (von

  15. Post-Project Market Review as a Tool for Stimulating Commercialisation of Knowledge Creation Projects

    NARCIS (Netherlands)

    Bout, Y.; Lombaers, Jaap H.M.; Constantinides, Efthymios; Fisscher, O.A.M.; de Weerd-Nederhof, Petronella C.; Oakey, R.; Groen, A.; Cook, G.; van der Sijde, P.

    2009-01-01

    Post-Project Reviews are mainly used as a tool to improve organisational learning (Busby, 1999; von Zedtwitz, 2002). However, post-project reviews can also be used as a tool to identify new market potential and to hand over technical knowledge from technical to marketing personnel (von Zedtwitz,

  16. Annual review of research projects 1980

    International Nuclear Information System (INIS)

    Keam, D.W.

    1981-11-01

    The Australian Radiation Laboratory is a national centre concerned with the public and occupational health aspects of the use of both ionising and non-ionising radiation. Thirty two projects which were in progress during 1980 are described

  17. Environmental standards and project construction: A review

    International Nuclear Information System (INIS)

    Mason, P.F.; Thornberry, H.L.

    1991-01-01

    In the past decade, changes have occurred in the area of environmental regulation. This paper identifies the typical environmental standards applicable to project construction, recent environmental regulatory issues and trends, and identifies new environmental issues which must be considered in project construction. These include (1) handling hazardous chemicals in the workplace, (2) construction at formerly utilized sites, (3) disposal of debris, construction materials and hazardous waste, and (4) training and experience of construction personnel in environmental issues

  18. Application of project design peer review to improve quality assurance

    International Nuclear Information System (INIS)

    McClure, F.E.

    1989-01-01

    DOE ORDER 5481.1B Safety Analysis and Review Systems and DOE ORDER 6430.1A General Design Criteria require that the design of facilities shall incorporate the necessary Quality Assurance review requirements to assure that the established program quality assurance objectives are met in the design criteria and the construction documents. The use of Project Design Peer Review to satisfy these requirements is presented. The University of California manages the Lawrence Berkeley Laboratory, the Lawrence Livermore National Laboratory, and the Los Alamos National Scientific Laboratory. The 1988 University Seismic Safety Policy requires the use of independent Project Design Peer Review in its capital improvement and seismic reconstruction program

  19. Annual review of research projects 1984

    International Nuclear Information System (INIS)

    Keam, D.W.

    1986-02-01

    This progress report provides a brief outline of current laboratory research and development projects and their present status. Research fields covered are: uranium, radon and its daughters, radiation effects in solids and gases, x-rays and clinical dosimetry, measurement standards in radiation dosimetry, radiopharmaceuticals and nuclear medicine, non-ionizing electromagnetic radiations, environmental radiochemistry and radiation monitoring

  20. Annual review of research projects 1983

    International Nuclear Information System (INIS)

    1985-08-01

    This progress report provides a brief outline of current laboratory research and development projects and their present status. Research fields covered are: uranium, radon and its daughters, radiation effects in solids and gases, thermoluminescence, x-rays and clinical dosimetry, measurement standards in radiation dosimetry, radiopharmaceuticals and nuclear medicine, radionuclide metrology, non-ionizing electromagnetic radiations, environmental radiochemistry and radiation monitoring

  1. Licensing Review in R+D Projects

    OpenAIRE

    Alessandro, Orsi

    2014-01-01

    FOSS packages are becoming ever more present in R&D projects carried out a variety of entities, including large corporations. I will focus on how legal risks associated with the use of FOSS licenses can be assessed and discuss measures directed to risk mitigation.

  2. Review of BPA funded sturgeon, resident fish and wildlife projects

    International Nuclear Information System (INIS)

    1990-12-01

    The Bonneville Power Administration (BPA) held a public meeting on November 19--21, 1991, for the purpose of review, coordination, and consultation of the BPA-funded projects for sturgeon, resident fish, and wildlife in the Columbia River Basin (Basin). The comments received after the meeting were favorable and the participants agreed that the meeting was stimulating and productive. The information exchanged should lead to better coordination with other projects throughout the Basin. This document list the projects by title, the project leaders and BPA's project officers, and an abstract of each leader's presentation

  3. A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-06-01

    Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region.

  4. A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region

  5. LBNL report of the vetting review of the GRETINA project

    International Nuclear Information System (INIS)

    Robinson, K.E.; Bercovitz, J.H.; Bieser, F.S.; Jared, R.C.; Karpenko, V.P.; Klein, S.R.; Lesko, K.T.; Rasson, J.E.; Ritter, H.G.; Tull, C.E.; Wells, R.; Wieman, H.H.

    2004-01-01

    GRETINA is a gamma-ray detector array capable of reconstructing the energy and spatial positions of gamma-ray interactions within the germanium crystals. It will be used to study the structure and stability of nuclei under various conditions. The new capabilities provided by gamma-ray tracking will give large gains in sensitivity for a large number of experiments, particularly those aimed at nuclei far from beta stability. A proposal for GRETINA was submitted to DOE in June 2003. It presented the scientific case, the readiness of technical development, the design, the suggested management organizations, and a proposed cost and schedule. The GRETINA proposal received its CD0 approval in August 2003. The CD-1 review will be held on December 3 and 4, 2003, and will be handled by the DOE-N. This report presents the charge to the GRETINA vetting review committee, and the findings, comments and recommendations of this committee. The purpose of this project vetting review was to assure that the GRETINA project is on track to provide DOE and the nuclear physics community with the agreed upon deliverables within the agreed upon budget and schedule. The vetting review committee was asked to cover both technical and management aspects of the GRETINA Project. Reviewers offer expert knowledge in relevant areas and provide recommendations and findings to the project's management team. Upon successful completion, the Laboratory's Integrated Project Management Office (IPMO) will recommend signoff of the project to the Laboratory Directorate. The GRETINA vetting review committee was asked to consider all relevant aspects of the project's management, project execution plan (PEP), technical approach and status, cost estimate, resources, schedule and risk and, in doing so, to advise as to whether the GRETINA Project was likely to successfully provide the agreed upon deliverables within the agreed upon budget and schedule. The review committee was asked to identify any project areas

  6. Review of Ruegen herring larvae survey project 2011

    NARCIS (Netherlands)

    Dickey-Collas, M.; Nash, R.D.M.

    2011-01-01

    At the request of the Johann Heinrich von Thünen Institut (vTI), IOR Rostock, a return review of the German Rügen herring larval survey (RHLS) project took place on the 24th to 26th January 2011, following on from a similar review in November 2006. Mark Dickey-Collas (Wageningen IMARES) and Richard

  7. Annual review of research projects 1985

    International Nuclear Information System (INIS)

    Keam, D.W.

    1987-04-01

    This progress report provides a brief outline of current Laboratory research and development projects and their present status. The material has been grouped into the following fields: uranium, radon and its daughters; radiation effects in solids and gases; x-rays and clinical dosimetry, measurement standards in radiation dosimetry; radiopharmaceuticals and nuclear medicine; non-ionising electromagnetic radiation; environmental radiochemistry and radiation monitoring. The last category includes residual radioactive contamination at Maralinga, Emu and the Monte Bello Islands from British nuclear weapons tests in Australia, and the public health impact of fall-out from those tests

  8. RPERT: Repetitive-Projects Evaluation and Review Technique

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2014-03-01

    Full Text Available Estimating expected completion probability of any repetitive construction project with a specified/certain duration including repetitive identical activities by using program evaluation and review technique is the most essential part in construction areas since the activities were had optimistic, most likely and pessimistic durations. This paper focuses on the calculation of expected completion probability of any repetitive construction project within a specified/certain duration (contract duration by using Line Of Balance technique (LOB in case of single or multiple number of crews integrated with Program Evaluation and Review Technique (PERT. Repetitive-Projects Evaluation and Review Technique (RPERT, which is a simplified software, will generate the expected project completion probability of a specified/certain duration (contract duration. RPERT software is designed by java programming code system to provide a number of new and unique capabilities, including: (1 Viewing the expected project completion probability according to a set of specified durations per each identical activity (optimistic time, most likely time, and pessimistic time in the analyzed project; (2 Providing seamless integration with available project time calculations. In order to provide the aforementioned capabilities of RPERT, the system is implemented and developed in four main modules: (1 A user interface module; (2 A database module; (3 A running module; and (4 A processing module. At the end, an illustrative example will be presented to demonstrate and verify the applications of proposed software (RPERT, by using probabilistic calculations for repetitive construction projects.

  9. Contractor firm strategies in delivering green project: A review

    Science.gov (United States)

    Powmya, Ayisha; Abidin, Nazirah Zainul; Azizi, Nurul Sakina Mokhtar

    2017-10-01

    Building green requires effort from various parties, from those who plan, design, manage and construct the building. Contractors are responsible for converting the design on paper into a real building and their role at the construction site support environmental sustainability by implementing responsible construction practices. Inefficient or inexperienced contractor in green construction project may find that delivering this type of project is not an easy task due to added requirement in design, stringent practices at site and the use of green technology and materials. Adopting suitable strategies at firm level will assist in preparatory process and readiness of delivering the green project. This paper reviews the strategies at firm level to deliver green construction project. From extensive literature review, it was discovered that there are six strategies to be adopted by the contractor. Understanding these strategies is expected to promote more contractors to be proactive in delivering green projects.

  10. A review of the possible future HEP Accelerator Projects

    CERN Multimedia

    CERN. Geneva

    2010-01-01

    The review, as already invited for presentation at the recent International Conference on High Energy Physics (ICHEP2010), covers all accelerator projects presently envisaged for HEP in the near and mid-term future. After a brief description of the major motivation, issues and necessary R&D of each project, it specially emphasizes the synergies between the different projects and their R&D issues, pointing out their complementarities and the efficient collaborative approach to address them. It finally summarizes the relative schedule of the various projects in their different phases, pointing out their global interdependence.

  11. Annual review of research projects 1987

    International Nuclear Information System (INIS)

    Keam, D.W.

    1989-04-01

    The Australian Radiation Laboratory is a national laboratory whose function is to assist the users of radiation, and those who regulate its use, to ensure that wherever radiation is encountered, it is managed in the safest possible way. In performing this function the Laboratory conducts a varied program of applied research in areas which have implications for occupational or public health. This progress report provides a brief outline of current Laboratory research and development projects and their present status. The material is grouped into the following research fields: uranium, radon and its daughters; environmental radiation monitoring; radiopharmaceuticals and nuclear medicine; X-ray and clinical dosimetry; radionuclide metrology; non-ionising electromagnetic radiations; measurement standards in radiation dosimetry; and radiation effects in solids and gases. Refs., figs., tabs

  12. Projective geometry solved problems and theory review

    CERN Document Server

    Fortuna, Elisabetta; Pardini, Rita

    2016-01-01

    This book starts with a concise but rigorous overview of the basic notions of projective geometry, using straightforward and modern language. The goal is not only to establish the notation and terminology used, but also to offer the reader a quick survey of the subject matter. In the second part, the book presents more than 200 solved problems, for many of which several alternative solutions are provided. The level of difficulty of the exercises varies considerably: they range from computations to harder problems of a more theoretical nature, up to some actual complements of the theory. The structure of the text allows the reader to use the solutions of the exercises both to master the basic notions and techniques and to further their knowledge of the subject, thus learning some classical results not covered in the first part of the book. The book addresses the needs of undergraduate and graduate students in the theoretical and applied sciences, and will especially benefit those readers with a solid grasp of ...

  13. Congressional hearing reviews NSF major research and facilities projects

    Science.gov (United States)

    Showstack, Randy

    2012-03-01

    An 8 March congressional hearing about the U.S. National Science Foundation's Major Research Equipment and Facilities Construction (NSF MREFC) account focused on fiscal management and accountability of projects in that account and reviewed concerns raised by NSF's Office of Inspector General (OIG). NSF established the MREFC account in 1995 to better plan and manage investments in major equipment and facilities projects, which can cost from tens of millions to hundreds of millions of dollars, and the foundation has funded 17 MREFC projects since then. The Obama administration's proposed fiscal year (FY) 2013 budget includes funding for four MREFC projects: Advanced Laser Gravitational-Wave Observatory (AdvLIGO), Advanced Technology Solar Telescope (ATST), National Ecological Observatory (NEON), and Ocean Observatories Initiative (OOI). The hearing, held by a subcommittee of the House of Representatives' Committee on Science, Space, and Technology, reviewed management oversight throughout the life cycles of MREFC projects and concerns raised in recent OIG reports about the use of budget contingency funds. NSF's February 2012 manual called "Risk management guide for large facilities" states that cost contingency is "that portion of the project budget required to cover `known unknowns,'" such as planning and estimating errors and omissions, minor labor or material price fluctuations, and design developments and changes within the project scope. Committee members acknowledged measures that NSF has made to improve the MREFC oversight process, but they also urged the agency to continue to take steps to ensure better project management.

  14. A desk evaluation review of project RAF/4/004 nuclear instruments maintenance. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-04-15

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the outputs of a project. This project was originally intended for six selected countries in Africa, namely, Algeria, Egypt, Ghana, Libya, Zaire and Zambia. Ethiopia and Tanzania joined in 1993 and it has now been extended to two other countries, Madagascar and Sudan. This is a step forward towards developing the infrastructure for nuclear instrumentation and maintenance is as many countries in Africa as require this service. A project summary along with financial data and recommendations for improvements are given. A table where total assistance provided to ten selected african countries is included.

  15. A desk evaluation review of project RAF/4/004 nuclear instruments maintenance. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the outputs of a project. This project was originally intended for six selected countries in Africa, namely, Algeria, Egypt, Ghana, Libya, Zaire and Zambia. Ethiopia and Tanzania joined in 1993 and it has now been extended to two other countries, Madagascar and Sudan. This is a step forward towards developing the infrastructure for nuclear instrumentation and maintenance is as many countries in Africa as require this service. A project summary along with financial data and recommendations for improvements are given. A table where total assistance provided to ten selected african countries is included

  16. Lessons Learned about Post-Tenure Review from the AAHE Peer Review of Teaching Project.

    Science.gov (United States)

    Taylor, James W.

    1999-01-01

    Describes use of a strategy adapted from the American Association for Higher Education's Peer Review of Teaching Project, the "reflective memo," to provide backward and forward view of post-tenure reviews in the chemistry department of the University of Wisconsin (Madison). The approach served as a guide in review of research, teaching,…

  17. Final design review report for K basin dose reduction project

    International Nuclear Information System (INIS)

    Blackburn, L.D.

    1996-01-01

    The strategy for reducing radiation dose originating from radionuclides absorbed in the K East Basin concrete is to raise the pool water level to provide additional shielding. This report documents a final design review for cleaning/coating basin walls and modifying other basin components where appropriate. The conclusion of this review was that the documents developed constitute an acceptable design for the Dose Reduction Project

  18. Design for Sustainability and Project Management Literature – A Review

    DEFF Research Database (Denmark)

    Ali, Faheem; Boks, Casper; Bey, Niki

    2016-01-01

    management literature has hardly been considered in design for sustainability research, this article attempts to review the points of intersection between these two fields, and explores the potential that knowledge from project management literature has in improving efficiency and effectiveness...... of development and implementation of design for sustainability tools.......The growing pressure on natural resources and increasing global trade have made sustainability issues a prime area of concern for all businesses alike. The increased focus on sustainability has impacted the way projects are conceived, planned, executed and evaluated in industries. Since project...

  19. First interim project review meeting on management of water hyacinth

    International Nuclear Information System (INIS)

    1980-01-01

    The first project planning meeting was held in New Delhi during 1978 and the second, a project review meeting, in Papua New Guinea during June 1979, both funded by UNEP. Reports from the regional coordinators for Bangladesh, Malaysia, Sri Lanka, Fiji and India are presented. Also presented are reports from the national coordinators for Malaysia, Bangladesh and India. Two visits (a visit to India, Bangladesh and Sri Lanka to study the feasibility of making a film on the work done with water hyacinth and a visit to the U.S. by the regional project coordinator) are also described

  20. Financing Renewable Energy Projects in Developing Countries: A Critical Review

    Science.gov (United States)

    Donastorg, A.; Renukappa, S.; Suresh, S.

    2017-08-01

    Access to clean and stable energy, meeting sustainable development goals, the fossil fuel dependency and depletion are some of the reasons that have impacted developing countries to transform the business as usual economy to a more sustainable economy. However, access and availability of finance is a major challenge for many developing countries. Financing renewable energy projects require access to significant resources, by multiple parties, at varying points in the project life cycles. This research aims to investigate sources and new trends in financing RE projects in developing countries. For this purpose, a detail and in-depth literature review have been conducted to explore the sources and trends of current RE financial investment and projects, to understand the gaps and limitations. This paper concludes that there are various internal and external sources of finance available for RE projects in developing countries.

  1. The Virtual Factory Teaching System (VFTS): Project Review and Results.

    Science.gov (United States)

    Kazlauskas, E. J.; Boyd, E. F., III; Dessouky, M. M.

    This paper presents a review of the Virtual Factory Teaching (VFTS) project, a Web-based, multimedia collaborative learning network. The system allows students, working alone or in teams, to build factories, forecast demand for products, plan production, establish release rules for new work into the factory, and set scheduling rules for…

  2. 76 FR 60774 - Review and Approval of Projects

    Science.gov (United States)

    2011-09-30

    ... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Part 806 Review and Approval of Projects AGENCY: Susquehanna River Basin Commission. ACTION: Notice of proposed rulemaking; reopening of comment period. SUMMARY: The purpose of this document is to inform the public of an extension of the comment period for...

  3. 77 FR 14272 - Review and Approval of Projects

    Science.gov (United States)

    2012-03-09

    ... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Part 806 Review and Approval of Projects CFR Correction In Title 18 of the Code of Federal Regulations, Part 400 to End, revised as of April 1, 2011, on page 118, in Sec. 806.6, (b)(1)(i) and (ii) are removed. [FR Doc. 2012-5837 Filed 3-8-12; 8:45 am] BILLING...

  4. Baseline review of the U.S. LHC Accelerator project

    International Nuclear Information System (INIS)

    1998-02-01

    The Department of Energy (DOE) Review of the U.S. Large Hadron Collider (LHC) Accelerator project was conducted February 23--26, 1998, at the request of Dr. John R. O'Fallon, Director, Division of High Energy Physics, Office of Energy Research, U.S. DOE. This is the first review of the U.S. LHC Accelerator project. Overall, the Committee found that the U.S. LHC Accelerator project effort is off to a good start and that the proposed scope is very conservative for the funding available. The Committee recommends that the project be initially baselined at a total cost of $110 million, with a scheduled completion data of 2005. The U.S. LHC Accelerator project will supply high technology superconducting magnets for the interaction regions (IRs) and the radio frequency (rf) straight section of the LHC intersecting storage rings. In addition, the project provides the cryogenic support interface boxes to service the magnets and radiation absorbers to protect the IR dipoles and the inner triplet quadrupoles. US scientists will provide support in analyzing some of the detailed aspects of accelerator physics in the two rings. The three laboratories participating in this project are Brookhaven National Laboratory, Fermi National Accelerator Laboratory (Fermilab), and Lawrence Berkeley National Laboratory. The Committee was very impressed by the technical capabilities of the US LHC Accelerator project team. Cost estimates for each subsystem of the US LHC Accelerator project were presented to the Review Committee, with a total cost including contingency of $110 million (then year dollars). The cost estimates were deemed to be conservative. A re-examination of the funding profile, costs, and schedules on a centralized project basis should lead to an increased list of deliverables. The Committee concluded that the proposed scope of US deliverables to CERN can be readily accomplished with the $110 million total cost baseline for the project. The current deliverables should serve as

  5. [Review and analysis of the review results of Taiwan nurses association nursing projects (2011~2013)].

    Science.gov (United States)

    Chang, Li-Yin; Chen, Yu-Chih; Huang, Kuang-Chi; Huang, Jui-Lan; Lee, Tso-Ying

    2015-04-01

    Nursing projects are a key part of N4 professional competency training for nursing personnel. Low passage rates for these projects have been shown to negatively affect the intent of nursing personnel to advance further in the nursing ladder system. This study analyzes the scores for nursing projects between 2011 and 2013, the passage rate for these projects, and the differences in passage rates between different types of projects. This retrospective and descriptive study collected data on nursing projects conducted under the auspices of the Taiwan Nurses Association between 2011 and 2013. Furthermore, the comments of reviewers on 100 nursing projects were randomly selected and subjected to content analysis. A total of 3,359 nursing projects were examined. Eliminating unqualified nursing projects left a total of 3,246 projects for the dataset. A total of 1,099 projects were scored with passing grades, giving a passing rate of 33.9%. The authors of these passing projects worked primarily in northern Taiwan, worked in medical centers, and worked in intensive care departments. The projects submitted by authors in central Taiwan had the highest average score and passing rate, while those living in offshore islands had the lowest average score and passing rate. Most of the project topics belonged to the category: "improvement of nursing service skills or quality" (77.3%). Items with the lowest scores were: validation of questions, analysis of the current situation, and evaluation of results. The topics of nursing projects did not relate significantly to passing rate. However, years of experience, geographic location of hospital, level of institution, and department each had a statistically significant impact on the passage rate. A content analysis of reviewer comments was used to extract common problems. Most of the positive comments were related to the category of "literature review and reference", while most of the negative comments were related to the categories of

  6. The sustainable project management: A review and future possibilities

    Directory of Open Access Journals (Sweden)

    V.K. Chawla

    2018-06-01

    Full Text Available Sustainability in project operations such as financial, social and environmental sustainability is one of the most prominent issues of the present times to address. The increased focus on sus-tainable business operations has changed the viewpoint of researchers and corporate community towards the project management. Today sustainability in business operations along with sustain-ability of natural and environmental resources are of paramount significance which has further caused a huge impact on conception, planning, scheduling and execution of the project manage-ment activities. In this paper, a literature review between 1987 and 2018 on different issues af-fecting the sustainability in project management is carried out. The present study also identifies and discusses the future possibilities to apply computational procedures in order to estimate and optimize the sustainability issues in the management of projects, for example the computational evolutionary algorithms can be applied to formulate the multi-objective decision-making problem after considering critical factors of sustainability in the projects and then yielding optimized solu-tions for the formulated problem to achieve sustainability in the projects. A new integrated framework with the inclusion of feedback function for assessment of each decision and actions taken towards the sustainability of the projects is also identified and presented.

  7. SPI Project Criticality Task Force initial review and assessment

    International Nuclear Information System (INIS)

    McKinley, K.B.; Cannon, J.W.; Marsden, R.S.; Worle, H.A.

    1980-03-01

    The Slagging Pyrolysis Incinerator (SPI) Facility is being developed to process transuranic waste stored and buried at the Idaho National Engineering Laboratory (INEL) into a chemically inert, physically stable, basalt-like residue acceptable for a Federal Repository. A task force was established by the SPI Project Division to review and assess all aspects of criticality safety for the SPI Facility. This document presents the initial review, evaluations, and recommendations of the task force and includes the following: background information on waste characterization, and criticality control approaches and philosophies, a description of the SPI Facility Waste Processing Building, a review and assessment of potentially relevant codes and regulations; a review and assessment of the present state of criticality and assaying/monitoring studies, and recommendations for changes in and additions to these studies. The review and assessment of potentially relevant codes and regulations indicate that ERDAM 0530, Nuclear Criticality Safety should be the controlling document for criticality safety for the SPI Project. In general, the criticality control approaches and philosophies for the SPI Project comply with this document

  8. Project risk management: A review of an institutional project life cycle

    Directory of Open Access Journals (Sweden)

    Wanjiru Gachie

    2017-11-01

    Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects

  9. Review on Population Projection Methodology for Radiological Dose Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Jang, M. S.; Kang, H. S.; Kim, S. R. [NESS, Daejeon (Korea, Republic of); Hwang, W. T. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Yang, Y. H. [KHNP, Daejeon (Korea, Republic of)

    2015-05-15

    Radiation environment report (RER), one of the essential documents in plant operating license or continuous operation license, includes population projection. Population estimates are utilized in determining the collective dose at the operation or restart time of nuclear power plant. Many population projection models are suggested and also under development. We carried out the sensitivity analysis on various population projection models to Daejeon city as a target. Daejeon city showed the increase or decrease in the cross-sectional population, because of the development of Sejong city, Doan new town and etc. We analyzed the population of Daejeon city using statistical ARIMA model and various simple population projection models. It is important to determine the population limit in Modified exponential model but it is not easy. Therefore, the various properties of the area such as the decrease and increase of population, new town development plan, social and natural environment change and etc., should be carefully reviewed to estimate the future population of any area.

  10. Review on Population Projection Methodology for Radiological Dose Assessment

    International Nuclear Information System (INIS)

    Jang, M. S.; Kang, H. S.; Kim, S. R.; Hwang, W. T.; Yang, Y. H.

    2015-01-01

    Radiation environment report (RER), one of the essential documents in plant operating license or continuous operation license, includes population projection. Population estimates are utilized in determining the collective dose at the operation or restart time of nuclear power plant. Many population projection models are suggested and also under development. We carried out the sensitivity analysis on various population projection models to Daejeon city as a target. Daejeon city showed the increase or decrease in the cross-sectional population, because of the development of Sejong city, Doan new town and etc. We analyzed the population of Daejeon city using statistical ARIMA model and various simple population projection models. It is important to determine the population limit in Modified exponential model but it is not easy. Therefore, the various properties of the area such as the decrease and increase of population, new town development plan, social and natural environment change and etc., should be carefully reviewed to estimate the future population of any area

  11. Researchers' experience with project management in health and medical research: Results from a post-project review

    Science.gov (United States)

    2011-01-01

    Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721

  12. The Greenland Analogue Project (GAP). Literature review of hydrogeology/ hydrogeochemistry

    International Nuclear Information System (INIS)

    Wallroth, Thomas; Lokrantz, Hanna; Rimsa, Andrius

    2010-09-01

    This report is produced as part of the Greenland Analogue Project (GAP), carried out as a collaboration project with the Canadian Nuclear Waste Management Organization (NWMO), Posiva Oy and the Swedish Nuclear Fuel and Waste Management Co (SKB). The overall aim of the project is to improve the current understanding of hydrogeological and hydrogeochemical processes associated with continental-scale glacial periods including with the presence of permafrost and the advance/retreat of ice sheets. The project will focus on studying how an ice sheet affects groundwater flow and water chemistry around a deep geological repository in crystalline bedrock. The Greenland Analogue Project consists of three active sub-projects (A-C) with individual objectives. Field studies are conducted in the Kangerlussuaq region, in central Western Greenland. Sub-projects A and B collectively aim at improving the understanding of ice sheet hydrology by combining investigations on surface water processes with ice sheet drilling and instrumentation. In sub-project C, the penetration of glacial melt water into the bedrock, groundwater flow and the chemical composition of water will be studied. Main planned activities in sub-project C include drilling of a deep borehole in front of the ice sheet, in which different downhole surveys, sampling and monitoring will be carried out. The primary aim of this report is to review available information about hydrogeology and hydrogeochemistry in central Western Greenland, with special emphasis on the area around Kangerlussuaq. The relevant information about this area is however very limited, and it was decided to extend the review to briefly include studies made in other regions with similar conditions in terms of geology, climate and glaciology. The number of published studies made in other areas with glaciers, ice sheets or permafrost is very large, and the review and list of references in this report is far from complete. It is also obvious that both

  13. The Greenland Analogue Project (GAP). Literature review of hydrogeology/ hydrogeochemistry

    Energy Technology Data Exchange (ETDEWEB)

    Wallroth, Thomas; Lokrantz, Hanna; Rimsa, Andrius (Bergab Consulting Geologists, Goeteborg (Sweden))

    2010-09-15

    This report is produced as part of the Greenland Analogue Project (GAP), carried out as a collaboration project with the Canadian Nuclear Waste Management Organization (NWMO), Posiva Oy and the Swedish Nuclear Fuel and Waste Management Co (SKB). The overall aim of the project is to improve the current understanding of hydrogeological and hydrogeochemical processes associated with continental-scale glacial periods including with the presence of permafrost and the advance/retreat of ice sheets. The project will focus on studying how an ice sheet affects groundwater flow and water chemistry around a deep geological repository in crystalline bedrock. The Greenland Analogue Project consists of three active sub-projects (A-C) with individual objectives. Field studies are conducted in the Kangerlussuaq region, in central Western Greenland. Sub-projects A and B collectively aim at improving the understanding of ice sheet hydrology by combining investigations on surface water processes with ice sheet drilling and instrumentation. In sub-project C, the penetration of glacial melt water into the bedrock, groundwater flow and the chemical composition of water will be studied. Main planned activities in sub-project C include drilling of a deep borehole in front of the ice sheet, in which different downhole surveys, sampling and monitoring will be carried out. The primary aim of this report is to review available information about hydrogeology and hydrogeochemistry in central Western Greenland, with special emphasis on the area around Kangerlussuaq. The relevant information about this area is however very limited, and it was decided to extend the review to briefly include studies made in other regions with similar conditions in terms of geology, climate and glaciology. The number of published studies made in other areas with glaciers, ice sheets or permafrost is very large, and the review and list of references in this report is far from complete. It is also obvious that both

  14. A desk evaluation review of project RAF/9/005 radiation protection development. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    The Agency has been assisting member nations through a number of national TC projects in radiation protection and related areas over the years. In addition, a regional project RAF/9/005 - Radiation Protection Development (which is under this review) was approved in 1988, with the aim of assessing existing radiation protection practices in the African Member States in relation to the Agency's new basic safety standards for radiation protection, and to advise Governments on improvements. The project was subsequently extended up to 1994 as an umbrella project to assist all African Member States in the development of appropriate radiation protection services; to co-ordinate the implementation of the relevant national TC projects; and to develop co-operation amongst groups of Member States on a regional and sub-regional basis. Particular emphasis was to be given to manpower development through workshops, seminars and training courses in radiation protection and safety. In parallel thereto, the Agency's Radiation Protection Advisory Teams (RAPATs) visited nineteen African Member States during the period 1986 through 1993, to review and assess their radiation protection activities, identify priorities, and design long-term radiation protection programmes. RAPAT findings and recommendations were considered in drawing up programmes for implementation under project RAF/9/005

  15. Nuclear heating - a review of projects in several countries

    International Nuclear Information System (INIS)

    Vymetal, L.

    1980-01-01

    A review is presented of projects and studies of nuclear heat generation and district heating in the USSR, France, Sweden, Finland, USA, FRG, and CSSR. Attention is primarily paid to the nuclear sources, i.e., nuclear power and heating plants and special reactors for nuclear heating plants. The questions of heat transmission and costs are also dealt with. The review is based on the literature published between 1976 and 1979. An important source were materials from the conference on the use of low-potential heat from nuclear reactors held in Otaniemi (Finland) in 1977. (author)

  16. Critical Success Factors for Malaysian Construction Projects: An Investigative Review

    Directory of Open Access Journals (Sweden)

    Yee Cheong Yong

    2017-05-01

    Full Text Available Construction projects play an important role in the advancement of a nation through infrastructure development that leads to economic growth. They are planned carefully to accomplish certain goals. However, not all the projects achieved the goals as per planned. Many factors contribute to the successes and failures, and it becomes an interesting arena for research. The primary objective of this paper is to outline the development trend of project success measurement globally and locally. The research method employed was to make selected reviews on critical success factors' (CSFs literature and to compare international standards and progress in incorporating human behavioural aspects of project management to the situation in Malaysia. A somewhat similar pattern can be observed in Malaysia where the studies have departed from the usual criteria of time, cost and quality, to define project success in a more holistic way. However, the domestic industry has failed to respond to the emerging trend globally as there has yet been any widely published research on the importance of human-related factors towards project success. A consolidated framework of CSFs has therefore, been proposed in responding to the findings. This paper fulfils an identified need as there has been a dearth of research on the subject matter locally.

  17. Project for review of nuclear energy in the Netherlands

    International Nuclear Information System (INIS)

    Jong, J.J. de

    1988-03-01

    In consequence of the accident national as well as international activities have been undertaken, in particular in the areas of reactor safety and environmental impacts. The international activities were concentrated at IAEA in Vienna, NEA in Paris and the EG. Nationally regarded the accident has induced the project Review and the working plan for rounding-off Chernobylsk. In general it could be noted that one has learned lessons from the accident in the areas of reactor safety and environmental impacts. 22 refs

  18. Auditory hallucinations: A review of the ERC "VOICE" project.

    Science.gov (United States)

    Hugdahl, Kenneth

    2015-06-22

    In this invited review I provide a selective overview of recent research on brain mechanisms and cognitive processes involved in auditory hallucinations. The review is focused on research carried out in the "VOICE" ERC Advanced Grant Project, funded by the European Research Council, but I also review and discuss the literature in general. Auditory hallucinations are suggested to be perceptual phenomena, with a neuronal origin in the speech perception areas in the temporal lobe. The phenomenology of auditory hallucinations is conceptualized along three domains, or dimensions; a perceptual dimension, experienced as someone speaking to the patient; a cognitive dimension, experienced as an inability to inhibit, or ignore the voices, and an emotional dimension, experienced as the "voices" having primarily a negative, or sinister, emotional tone. I will review cognitive, imaging, and neurochemistry data related to these dimensions, primarily the first two. The reviewed data are summarized in a model that sees auditory hallucinations as initiated from temporal lobe neuronal hyper-activation that draws attentional focus inward, and which is not inhibited due to frontal lobe hypo-activation. It is further suggested that this is maintained through abnormal glutamate and possibly gamma-amino-butyric-acid transmitter mediation, which could point towards new pathways for pharmacological treatment. A final section discusses new methods of acquiring quantitative data on the phenomenology and subjective experience of auditory hallucination that goes beyond standard interview questionnaires, by suggesting an iPhone/iPod app.

  19. End user orientation of TC projects. Special evaluation review

    International Nuclear Information System (INIS)

    1996-12-01

    The present review of the end use orientation of TC projects was undertaken as requested by the TC Department to identify: (a) end users and beneficiaries beyond the boundaries of the counterpart laboratories, as appropriate; (b) means provided or planned to reach the end users and beneficiaries; (c) performance indicators in quantifiable terms, including those related to the counterpart activities that could be foreseen during and after completion of Agency assistance; and (d) recommendations of additional means, if necessary, to reach the end users and beneficiaries. A total of 13 TC projects with large budgets of around $200,000 and above were selected from those first approved under the 1995-1996 biennial programme and supported under the TCF, representing diverse fields of Agency activities and covering all the geographical areas of the Agency's technical co-operation. The projects thus selected were one each from Argentina, Bolivia, Bulgaria, Chile, Colombia, Egypt, Ethiopia, Jordan, Mexico, Mongolia, Slovenia, Turkey and Viet-Nam. The overall budget of the 13 projects as originally approved for 1995 to 1998, amounted to $5,510,980. The current budget as of 8 November 1996 stands at $5,446,719, representing a decrease of more than one percent. Figs, tabs

  20. A desk evaluation review of project BGD/5/010 food irradiation. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-03-26

    To increase the availability of food, the Bangladesh Atomic Energy Commission (BAEC), through its institute of Food and Radiation Biology (IFRB), has for many years pursued research studies in the use of ionizing radiation for food disinfestation and preservation. The Agency has been assisting these research efforts since the late 1970s. Project BGD/5/010, Food Irradiation, as reformulated in 1984, was to take on-going activities ones step further, with the main objective of demonstrating on a semi-commercial scale the efficacy and profitability of food irradiation in reducing the high storage losses of economically important food, such as potatoes, onions, dried fish and other seafood. A further objective was the transfer of food irradiation technology to the relevant industries in Bangladesh. The total budget of the project for the years 1983 through 1992 includes 5.1 man-months of expert services, $1,064,634 for equipment and $29,200 for training. The review was undertaken upon request by the Asia and the Pacific Section, to assess the current status of this ten-year project, which has encountered numerous delays and set-backs and is now nearing completion, and to determine to what extent the experience gained on the project could be useful in the implementation of similar on-going and future projects.

  1. A desk evaluation review of project BGD/5/010 food irradiation. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    To increase the availability of food, the Bangladesh Atomic Energy Commission (BAEC), through its institute of Food and Radiation Biology (IFRB), has for many years pursued research studies in the use of ionizing radiation for food disinfestation and preservation. The Agency has been assisting these research efforts since the late 1970s. Project BGD/5/010, Food Irradiation, as reformulated in 1984, was to take on-going activities ones step further, with the main objective of demonstrating on a semi-commercial scale the efficacy and profitability of food irradiation in reducing the high storage losses of economically important food, such as potatoes, onions, dried fish and other seafood. A further objective was the transfer of food irradiation technology to the relevant industries in Bangladesh. The total budget of the project for the years 1983 through 1992 includes 5.1 man-months of expert services, $1,064,634 for equipment and $29,200 for training. The review was undertaken upon request by the Asia and the Pacific Section, to assess the current status of this ten-year project, which has encountered numerous delays and set-backs and is now nearing completion, and to determine to what extent the experience gained on the project could be useful in the implementation of similar on-going and future projects

  2. [Nuclear energy and environment: review of the IAEA environmental projects].

    Science.gov (United States)

    Fesenko, S; Fogt, G

    2012-01-01

    The review of the environmental projects of the International Atomic Energy Agency is presented. Basic IAEA documents intended to protect humans and the Environment are considered and their main features are discussed. Some challenging issues in the area of protection of the Environment and man, including the impact of nuclear facilities on the environment, radioactive waste management, and remediation of the areas affected by radiological accidents, nuclear testing and sites of nuclear facilities are also discussed. The need to maintain the existing knowledge in radioecology and protection of the environment is emphasised.

  3. 1990 DOE/SANDIA crystalline photovoltaic technology project review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Ruby, D.S. (ed.)

    1990-07-01

    This document serves as the proceedings for the annual project review meeting held by Sandia's Photovoltaic Cell Research Division and Photovoltaic Technology Division. It contains information supplied by each organization making a presentation at the meeting, which was held August 7 through 9, 1990 at the Sheraton Hotel in Albuquerque, New Mexico. Sessions were held to discuss national photovoltaic programs, one-sun crystalline silicon cell research, concentrator silicon cell research, concentrator 3-5 cell research, and concentrating collector development.

  4. 7 CFR 1486.506 - When will a project be reviewed?

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false When will a project be reviewed? 1486.506 Section... Reporting, Evaluation, and Compliance § 1486.506 When will a project be reviewed? Any project or activity... after the completion of the project. ...

  5. Nuclear emergency planning in Spain. The PLABEN review project

    International Nuclear Information System (INIS)

    Lentijo Lentijo, J. C.; Vila Pena, M.

    2002-01-01

    The international rules and recommendations for nuclear emergency planning and the Spanish experience gained in the management of event with radiological risk have noticed that is necessary to review the planning radiological bases for emergencies in nuclear power plants and to define the planning radiological bases for radiological emergencies that could happen in radioactive facilities or in activities out of the regulatory framework. The paper focuses on CSN actions concerning the Plaben review project related to define the new radiological principles taking into account the current international recommendations for interventions, make a proposal about the organisation and operation of the provincial radiological action group and the national support level for radiological emergency response. (Author) 7 refs

  6. Design iteration in construction projectsReview and directions

    Directory of Open Access Journals (Sweden)

    Purva Mujumdar

    2018-03-01

    Full Text Available Design phase of any construction project involves several designers who exchange information with each other most often in an unstructured manner throughout the design phase. When these information exchanges happen to occur in cycles/loops, it is termed as design iteration. Iteration is an inherent and unavoidable aspect of any design phase which requires proper planning. Till date, very few researchers have explored the design iteration (“complexity” in construction sector. Hence, the objective of this paper was to document and review the complexities of iteration during design phase of construction projects for efficient design planning. To achieve this objective, exhaustive literature review on design iteration was done for four sectors – construction, manufacturing, aerospace, and software development. In addition, semi-structured interviews and discussions were done with a few design experts to verify the different dimensions of iteration. Finally, a design iteration framework was presented in this study that facilitates successful planning. Keywords: Design iteration, Types of iteration, Causes and impact of iteration, Models of iteration, Execution strategies of iteration

  7. Decommissioning project readiness reviews at the Department of Energy's Hanford, Washington, Site

    International Nuclear Information System (INIS)

    Speer, D.R.; Holmes, P.A.

    1987-01-01

    Two Hanford Site contractors independently formulated readiness review methods to prepare for decontamination and decommissioning (D and D) projects. One readiness review method provided an independent management review process. The other method provided a review by personnel directly involved in the project and concise documentation procedures. A unified system is now used at Hanford which combines the best aspects of both readiness review methods. The unified method assigns category levels based on certain job characteristics. The category assigned to the project then indicates the required level of management review prior to proceeding with the D and D project. In addition, the concise documentation procedures are now used for all category levels

  8. HHARP: The Historical Hospital Admission Records Project – a review

    Directory of Open Access Journals (Sweden)

    Cara Hirst

    2018-04-01

    Full Text Available Hospital records have frequently been used in epidemiological research (Kilgore et al. 2017; Rushton 2016, and in some cases palaeopathological research. However, the availability of data is problematic, with written records requiring considerable time to interpret, digitise and analyse. In 2001, the Historical Hospital Records Project (HHARP began digitising over 140,000 hospital admission records from four hospitals in London and Glasgow, providing researchers with an online data base of hospital records (Figure 1. I review the data available in the HHARP database, as well as make a preliminary analysis of the hospital records from London and Glasgow between c.1852-1921 which illustrates the value of the HHARP database in understanding disease and medical care during this period.

  9. Using fuzzy logic to improve the project time and cost estimation based on Project Evaluation and Review Technique (PERT

    Directory of Open Access Journals (Sweden)

    Farhad Habibi

    2018-09-01

    Full Text Available Among different factors, correct scheduling is one of the vital elements for project management success. There are several ways to schedule projects including the Critical Path Method (CPM and Program Evaluation and Review Technique (PERT. Due to problems in estimating dura-tions of activities, these methods cannot accurately and completely model actual projects. The use of fuzzy theory is a basic way to improve scheduling and deal with such problems. Fuzzy theory approximates project scheduling models to reality by taking into account uncertainties in decision parameters and expert experience and mental models. This paper provides a step-by-step approach for accurate estimation of time and cost of projects using the Project Evaluation and Review Technique (PERT and expert views as fuzzy numbers. The proposed method included several steps. In the first step, the necessary information for project time and cost is estimated using the Critical Path Method (CPM and the Project Evaluation and Review Technique (PERT. The second step considers the duration and cost of the project activities as the trapezoidal fuzzy numbers, and then, the time and cost of the project are recalculated. The duration and cost of activities are estimated using the questionnaires as well as weighing the expert opinions, averaging and defuzzification based on a step-by-step algorithm. The calculating procedures for evaluating these methods are applied in a real project; and the obtained results are explained.

  10. TWTF project criticality task force final review and assessment

    International Nuclear Information System (INIS)

    McKinley, K.B.; Cannon, J.W.; Wheeler, F.J.; Worle, H.A.

    1980-11-01

    The Transuranic Waste Treatment Facility (TWTF) is being developed to process transuranic waste, stored and buried at the Idaho National Engineering Laboratory, into a chemically inert, physically stable basalt-like residue acceptable at a federal repository. A task force was assembled by the TWTF Project Division to review and assess all aspects of criticality safety for the TWTF. This document presents the final review, assessments, and recommendations of this task force. The following conclusions were made: Additional criticality studies are needed for the entire envelope of feed compositions and temperature effects. Safe operating k/sub eff/'s need to be determined for process components. Criticality analyses validation experiments may also be required. SRP neutron interrogation should be replaced by DDT neutron interrogation. Accuracy studies need to be performed for the proposed assaying techniques. Time-correlated neutron monitoring needs to be mocked up for process components to prove feasibility and determine accuracy. The criticality control techniques developed for the TWTF conceptual design are in compliance with ERDAM 0530, including the Double Contingency Rule. Detailed procedures and controls need to be developed

  11. Review of PV Inverter Technology Cost and Performance Projections

    Energy Technology Data Exchange (ETDEWEB)

    Navigant Consulting Inc.

    2006-01-01

    The National Renewable Energy Laboratory (NREL) has a major responsibility in the implementation of the U.S. Department of Energy's (DOE's) Solar Energy Technologies Program. Sandia National Laboratories (SNL) has a major role in supporting inverter development, characterization, standards, certifications, and verifications. The Solar Energy Technologies Program recently published a Multiyear Technical Plan, which establishes a goal of reducing the Levelized Energy Cost (LEC) for photovoltaic (PV) systems to $0.06/kWh by 2020. The Multiyear Technical Plan estimates that, in order to meet the PV system goal, PV inverter prices will need to decline to $0.25-0.30 Wp by 2020. DOE determined the need to conduct a rigorous review of the PV Program's technical and economic targets, including the target set for PV inverters. NREL requested that Navigant Consulting Inc.(NCI) conduct a review of historical and projected cost and performance improvements for PV inverters, including identification of critical barriers identified and the approaches government might use to address them.

  12. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack

    1984-11-01

    This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.

  13. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project FY17 Annual Review

    Science.gov (United States)

    Sakahara, Robert; Hackenberg, Davis; Johnson, William

    2017-01-01

    This presentation was presented to the Integrated Aviation Systems Program at the FY17 Annual Review of the UAS-NAS project. The presentation captures the overview of the work completed by the UAS-NAS project and its subprojects.

  14. Software development project success and failure from the supplier's perspective: A systematic literature review

    OpenAIRE

    Savolainen, Paula; Ahonen, Jarmo J.; Richardson, Ita

    2012-01-01

    peer-reviewed In this paper, we consider software development project success and failure from the supplier's perspective. First we clarified concepts in order to be able to exclude review articles on in-house projects, continuous services, the customer's perspective, and software product development, with the aim of providing valid results for supplier firms. We divided success criteria into project success and project management (PM) success, and, in seven articles, identified thre...

  15. Fuel transfer system ALARA design review - Project A.15

    International Nuclear Information System (INIS)

    KUEBERTH, L.R.

    2001-01-01

    One mission of the Spent Nuclear Fuel (SNF) Project is to move the SNF from the K Basins in the Hanford 100K Area to an interim dry storage at the Canister Storage Building (CSB) in the Hanford 200 East Area. The Fuel Transfer System (FTS) is a subproject that will move the SNF from the 105K East (KE) Facility to the 105K West (KW) Facility. The SNF will be treated for shipment to the Cold Vacuum Drying (CVD) facility at the KW Basin. The SNF canisters will be loaded underwater into a Shielded Transfer Cask (STC) in the KE Basin. The fully loaded STC will be brought out of the water and placed into a Cask Transfer Overpack (CTO) by the STC Straddle Carrier. As the STC is removed from the water, it will be washed down with demineralized water by an manual rinse system. The CTO with the STC inside will be placed on a transport trailer and transferred to the KW Basin as an intra-facility transfer. The CTO will be unloaded from the shipping trailer at the KW Basin and the STC will be removed from the CTO. The STC will then be lowered into the KW Basin water and the fuel will be removed. The SNF will then be processed for shipment to the CVD. As soon as all of the fuel has been removed from the STC, the cask will be removed from the KW Basin water and placed into the CTO. The CTO will again be placed on the trailer for transport back to the KE Basin where the entire cycle will be repeated approximately 400 times. This document records the As Low As Reasonably Achievable (ALARA) findings and design recommendations/requirements by the SNF Project noted during the Final Design Review of the STC, CTO, STC Transfer System, Annexes and Roadways for support of FTS. This document is structured so that all statements that include the word ''shall'' represent design features that have been or will be implemented within the project scope. Statements that include the words ''should'' or ''recommend'' represent ALARA design features to be evaluated for future implementation

  16. Learning from open source software projects to improve scientific review.

    Science.gov (United States)

    Ghosh, Satrajit S; Klein, Arno; Avants, Brian; Millman, K Jarrod

    2012-01-01

    Peer-reviewed publications are the primary mechanism for sharing scientific results. The current peer-review process is, however, fraught with many problems that undermine the pace, validity, and credibility of science. We highlight five salient problems: (1) reviewers are expected to have comprehensive expertise; (2) reviewers do not have sufficient access to methods and materials to evaluate a study; (3) reviewers are neither identified nor acknowledged; (4) there is no measure of the quality of a review; and (5) reviews take a lot of time, and once submitted cannot evolve. We propose that these problems can be resolved by making the following changes to the review process. Distributing reviews to many reviewers would allow each reviewer to focus on portions of the article that reflect the reviewer's specialty or area of interest and place less of a burden on any one reviewer. Providing reviewers materials and methods to perform comprehensive evaluation would facilitate transparency, greater scrutiny, and replication of results. Acknowledging reviewers makes it possible to quantitatively assess reviewer contributions, which could be used to establish the impact of the reviewer in the scientific community. Quantifying review quality could help establish the importance of individual reviews and reviewers as well as the submitted article. Finally, we recommend expediting post-publication reviews and allowing for the dialog to continue and flourish in a dynamic and interactive manner. We argue that these solutions can be implemented by adapting existing features from open-source software management and social networking technologies. We propose a model of an open, interactive review system that quantifies the significance of articles, the quality of reviews, and the reputation of reviewers.

  17. Learning from open source software projects to improve scientific review

    Directory of Open Access Journals (Sweden)

    Satrajit S Ghosh

    2012-04-01

    Full Text Available Peer-reviewed publications are the primary mechanism for sharing scientific results. The current peer-review process is, however, fraught with many problems that undermine the pace, validity, and credibility of science. We highlight five salient problems: (1 Reviewers are expected to have comprehensive expertise; (2 Reviewers do not have sufficient access to methods and materials to evaluate a study; (3 Reviewers are not acknowledged; (4 There is no measure of the quality of a review; and (5 Reviews take a lot of time, and once submitted cannot evolve. We propose that these problems can be resolved by making the following changes to the review process. Distributing reviews to many reviewers would allow each reviewer to focus on portions of the article that reflect the reviewer’s specialty or area of interest and place less of a burden on any one reviewer, enabling a more comprehensive and timely review. Providing reviewers materials and methods to perform comprehensive evaluation would facilitate transparency, replication of results and enable greater scrutiny by people from different fields using different nomenclature, leading to greater clarity and cross-fertilization of ideas. Acknowledging reviewers makes it possible to quantitatively assess reviewer contributions, which could be integrated with assessments for promotions and grants. Quantifying review quality could help establish the importance of reviewers and information generated during a review, and assess the importance of a submitted article. Finally, we recommend expediting post-publication reviews and allowing for the dialogue to continue and flourish in a dynamic and interactive manner. We argue that these solutions can be addressed by building upon computer programming code management systems. In this article, we provide examples of current code review systems that offer opportunities for addressing the above problems, and offer suggestions for enhancing code review systems for

  18. Design review plan for Multi-Function Waste Tank Facility (Project W-236A)

    International Nuclear Information System (INIS)

    Renfro, G.G.

    1994-01-01

    This plan describes how the Multi-Function Waste Tank Facility (MWTF) Project conducts reviews of design media; describes actions required by Project participants; and provides the methodology to ensure that the design is complete, meets the technical baseline of the Project, is operable and maintainable, and is constructable. Project W-236A is an integrated project wherein the relationship between the operating contractor and architect-engineer is somewhat different than that of a conventional project. Working together, Westinghouse Hanford Company (WHC) and ICF Karser Hanford (ICF KH) have developed a relationship whereby ICF KH performs extensive design reviews and design verification. WHC actively participates in over-the-shoulder reviews during design development, performs a final review of the completed design, and conducts a formal design review of the Safety Class I, ASME boiler and Pressure Vessel Code items in accordance with WHC-CM-6-1, Standard Engineering Practices

  19. A Global Review of Sustainable Construction Project Financing: Policies, Practices, and Research Efforts

    Directory of Open Access Journals (Sweden)

    Ming Shan

    2017-12-01

    Full Text Available Despite the increasing investment in sustainable development over the past decade, a systematic review of sustainable construction project financing is lacking. The objectives of this paper are to conduct a systematic review to examine the policies, practices, and research efforts in the area of sustainable construction project financing, and to explore the potential opportunities for the future research. To achieve these goals, this paper first reviewed the sustainable construction project financing practices implemented by four representative developed economies including the United Kingdom, the United States, Singapore, and Australia. Then, this paper reviewed the efforts and initiatives launched by three international organizations including the United Nations, the Organization for Economic Co-operation and Development, and International Finance Corporation. After that, this paper reviewed the research efforts of sustainable construction project financing published in peer-review journals and books. This paper identified four major research themes within this area, which are the review of financial stakeholders and market of sustainable construction, benefits and barriers to sustainable construction project financing, financial vehicles for sustainable construction projects, innovative models and mechanisms for sustainable construction project financing. Additionally, this paper revealed five directions for the future research of sustainable construction project financing, which are the identification of financial issues in sustainable construction projects, the investigation of financial vehicles for sustainable construction projects in terms of their strengths, limitations, and performances, the examination of critical drivers for implementing sustainable construction project financing, the development of a knowledge-based decision support system for implementing sustainable construction financing, and the development of best practices for

  20. 78 FR 18348 - Submission for OMB Review; Use of Project Labor Agreements for Federal Construction Projects

    Science.gov (United States)

    2013-03-26

    ...: There is no existing Governmentwide data base that collects PLAs and specifically the number submitted... Project Labor Agreements for Federal Construction Projects AGENCY: Department of Defense (DOD), General... information collection requirement regarding Use of Project Labor Agreements for Federal Construction Projects...

  1. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack; Hwang, Diana

    1984-11-01

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  2. Review of the project risk management plan in the capital projects organization at ConocoPhillips

    OpenAIRE

    Meidell, Camilla

    2011-01-01

    Master's thesis in Risk management Project Risk Management (PRM) has in recent years become an important aspect of business organization and project management. There has always been a requirement for some risk management at COPNO. However about 3 years ago the process became much more defined and has become a requirement for the contingency used on projects to be based upon the risking process. Since risk management in projects is a requirement in the CP organization it is ...

  3. 18 CFR 806.4 - Projects requiring review and approval.

    Science.gov (United States)

    2010-04-01

    ... result of a change of the name, identity, internal corporate structure or place of organization and does... period, and undergoing a change of ownership, unless such project satisfies the requirements of..., and undergoing a change of ownership, unless such project satisfies the requirements of paragraphs (b...

  4. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab

  5. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-09

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab.

  6. A desk evaluation review of project POL/5/006 plant breeding using induced mutations. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    Projects POL/5/006 was initiated in 1985 to assist the Government of Poland in improving the mutation breeding efforts in the country to promote the development of new and higher yielding crop varieties. The difficult economic situation in the country at this time restricted the procurement of special equipment, spare parts and supplies from abroad and, therefore, impeded research and development work in this field. The project was implemented using a distinctive approach and design characterized by having six recipient institutions and the establishment of one central gamma-irradiation facility to be made available to all participating institutions for mutation induction. The project was formally closed in 1989. The review of project POL/5/006 was undertaken in accord with the expressed wishes of the Board of Governors for selected ex-post evaluations of completed projects. The main purpose of the review was to ascertain if the project objectives were achieved, and to determine what impact the technical assistance provided may have had on continued post-project and current plant breeding programmes in Poland

  7. A desk evaluation review of project POL/5/006 plant breeding using induced mutations. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-09-14

    Projects POL/5/006 was initiated in 1985 to assist the Government of Poland in improving the mutation breeding efforts in the country to promote the development of new and higher yielding crop varieties. The difficult economic situation in the country at this time restricted the procurement of special equipment, spare parts and supplies from abroad and, therefore, impeded research and development work in this field. The project was implemented using a distinctive approach and design characterized by having six recipient institutions and the establishment of one central gamma-irradiation facility to be made available to all participating institutions for mutation induction. The project was formally closed in 1989. The review of project POL/5/006 was undertaken in accord with the expressed wishes of the Board of Governors for selected ex-post evaluations of completed projects. The main purpose of the review was to ascertain if the project objectives were achieved, and to determine what impact the technical assistance provided may have had on continued post-project and current plant breeding programmes in Poland.

  8. Review of geography internship of convective wave project

    Science.gov (United States)

    Rademacher, Kurt R.; Collins, Charles

    1990-01-01

    The internship of the author is examined in detail. The acquisition of the internship, the personnel of the project, the project itself, and the goals associated with it are described. The authors orientation to the internship, the project's operations, and the conclusion of the findings are also described. The overall goal of the project was to determine the effect of convective waves on wind speeds in the middle and upper troposphere, and how these waves affect the general circulation on a global scale. A more specific goal of the author was the satellite analysis of cloud street formations. This was done to determine frequency and areas in which cloud streets occur off the East Asian and North American coastlines.

  9. Formal design review report project W-151 mixer pump procurement

    Energy Technology Data Exchange (ETDEWEB)

    Crass, D.W.

    1997-01-21

    A formal design review for WHC-S-0040 was held on January 21, 1993. The review was completed January 29, 1993. No outstanding action items existed. Comments were recorded on Record Comment Record (RCR) forms and incorporated into the specification. The specification was considered acceptable, approved and issued as WHC-S-0040, Rev. 0 on March 4, 1993.

  10. REVIEW ON CONSTRUCTION PROJECT MANAGEMENT SOFTWARE PRIMAVERA P6

    OpenAIRE

    Piyush Pramod Bagade* & Prof. Abhijit Bhirud

    2018-01-01

    Planning, scheduling and Resource levelling plays an important role in any construction project maybe it is construction of building or construction of road. In absence of proper planning, scheduling and resource levelling construction industry does not get profit over the project. For this purpose, proper software’s and techniques must be utilize. This paper is focussing on the advantages of Oracle Primavera P6 Software. The latest version of Primavera is P6-17. In any construction work huge...

  11. Amoco-US Environmental Protection Agency, pollution prevention project, Yorktown, Virginia: Project peer review. Report of the Peer Review Committee of the Amoco/EPA Pollution Prevention Project at the Yorktown, Virginia refinery

    International Nuclear Information System (INIS)

    Klee, H.; Podar, M.

    1991-01-01

    The Amoco/EPA Pollution Prevention Project involved a number of representatives from federal and Virginia regulatory agencies, and Amoco's refining business. Participants believed that the Project could benefit from a broader perspective than these organizations along might provide. The Project Work Group selected an independent Peer Review Process which was conducted by Resource for the Future (RFF), a Washington DC think tank. A group of technical, policy and environmental experts from diverse backgrounds served as Peer Review members. The Peer Review Committee met on three occasions to discuss (1) the Project Work Plan (2) sampling data and interpretation and (3) project conclusions and recommendations. The focus of the meeting was on the general scope and content of the project

  12. Status of India's population education programme--the subject of tripartite projects review and annual country review.

    Science.gov (United States)

    1981-12-01

    A 3-step monitoring of India's population education program was undertaken in 1981 in order to determine the level of implementation and progress of the program. This monitoring program, conducted by the Unesco Mobile Team in collaboration with other institutions, followed 3 procedures: Project Progress Report (PPR); Tripartite Project Review (TPR); and Annual Country Review (ACR). The review meetings of the 10 state population education projects were organized at Chandigarh and Madras during August. The states covered in the review were Bihar, Haryana, Madhaya Pradesh, Punjab, Rajasthan, Chandigarh, Gujarat, Karnataka, Maharashtra, and Tamil Nadu. The Tripartite Review identified the following as problems which were hindering the smooth implementation of the population education program: 1) difficulty in spending funds unless certain formalities were completed by the governments of the states; 2) administrative problems such as getting printing paper for instructional materials, waiving the sales tax for equipment to be purchased under the project, and uncertainty regarding the admissible rates of per diem to be paid to the participants in various training programs; 3) the lack of experience of project staff; 4) problems created by having more than 1 cell in a state such as Rajasthan; and 5) an inadequate time frame within which the project should complete all its activities and make population education an integral part of the school system. The following were among the recommendations made: 1) the Project should be made coterminous with the 6th Five-Year Plan up to March 31, 1985; and 2) there should be only 1 Population Education Cell in every state. Among the points discussed at the annual country review, held during October, were the following: rephasing of the program from a 3 to 5 year project to synchronize it with the 6th plan; and the need for additional funds in view of inflation.

  13. Preliminary design review report for K Basin Dose Reduction Project

    International Nuclear Information System (INIS)

    Blackburn, L.D.

    1996-01-01

    The strategy for reducing radiation dose, originating from radionuclides absorbed in the K East Basin concrete, is to raise the pool water level to provide additional shielding. This report documents a preliminary design review conducted to ensure that design approaches for cleaning/coating basin walls and modifying other basin components were appropriate. The conclusion of this review was that design documents presently conclusion of this review was that design documents presently completed or in process of modification are and acceptable basis for proceeding to complete the design

  14. A review of Studsvik's international power ramp test projects

    International Nuclear Information System (INIS)

    Mogard, H.; Kjaer-Pedersen, N.

    1985-11-01

    Since 1975 a series of internationally sponsored fuel irradiation research projects have been and are being conducted at Studsvik, Sweden, under the management of Studsvik Energiteknik AB. The sponsoring parties comprise fuel vendors, nuclear power utilities, national research organizations and, in some cases, safety authorities. Geographically the parties represent organizations in Europe, Japan, and the USA. The main research topic of the Studsvik projects is the Pellet Clad Interaction (PCI) induced Stress Corrosion Cracking (SCC) failure occurrence in LWR fuel under power ramping conditions. The research is conducted in the 50 MW R2 test reactor and the associated hot cell laboratory. Prior to the experiments the test fuel is base irradiated, normally in commercially operated light water reactors. Results have been published for the INTER-RAMP, OVER-RAMP, DEMO-RAMP I, DEMO-RAMP II and SUPER-RAMP projects. The release of the TRANS-RAMP I results is imminent. There are two ongoing projects, i.e. SUPER-RAMP EXTENSION and TRANS-RAMP II. The paper presents an overview of the objectives and main results of the various projects. An attempt is made to summarize the more important observations on PCI failure performance in the perspective of design parameters, fuel burnup levels, power histories, power ramp rates, etc. With 14 refs. (Author)

  15. Review of fusion research program: historical summary and program projections

    Energy Technology Data Exchange (ETDEWEB)

    Murphy, E.S.

    1976-09-01

    This report provides a brief review of the history and current status of fusion research in the United States. It also describes the Federally funded program aimed at the development of fusion reactors for electric power generation.

  16. Enhancement and creation of secondary channel habitat: Review of project performance across a range of project types and settings

    Science.gov (United States)

    Epstein, J.; Lind, P.

    2017-12-01

    Secondary channels provide critical off-channel habitat for key life stages of aquatic species. In many systems, interruption of natural processes via anthropogenic influences have reduced the quantity of secondary channel habitat and have impaired the processes that help form and maintain them. Creation and enhancement of secondary channels is therefore a key component of stream rehabilitation, particularly in the Pacific Northwest where the focus has been on enhancement of habitat for ESA-listed salmonids. Secondary channel enhancement varies widely in scope, scale, and approach depending on species requirements, hydrology/hydraulics, geomorphologic setting, sediment dynamics, and human constraints. This presentation will review case studies from numerous secondary channel projects constructed over the last 20 years by different entities and in different settings. Lessons learned will be discussed that help to understand project performance and inform future project design. A variety of secondary channel project types will be reviewed, including mainstem flow splits, year-round flow through, seasonally activated, backwater alcove, natural groundwater-fed, and engineered groundwater-fed (i.e. groundwater collection galleries). Projects will be discussed that span a range of project construction intensities, such as full excavation of side channels, select excavation to increase flow, or utilizing mainstem structures to activate channels. Different configurations for connecting to the main channel, and their relative performance, will also be presented. A variety of connection types will be discussed including stabilized channel entrance, free-formed entrance, using bar apex jams to split flows, using `bleeder' jams to limit secondary channel flow, and obstructing the main channel to divert flows into secondary channels. The performance and longevity of projects will be discussed, particularly with respect to the response to sediment mobilizing events. Lessons

  17. Systematic Review Methodology for the Fatigue in Emergency Medical Services Project

    Science.gov (United States)

    2018-01-11

    Background: Guidance for managing fatigue in the Emergency Medical Services (EMS) setting is limited. The Fatigue in EMS Project sought to complete multiple systematic reviews guided by seven explicit research questions, assemble the best available e...

  18. Army Corps of Engineers: Peer Review Process for Civil Works Project Studies Can Be Improved

    Science.gov (United States)

    2012-03-01

    exceeding $45 million EIS Cost of peer review contract Western C-111 Spreader Canal Project Implementation Report Jacksonville South...Federal Programs Congressional Relations Public Affairs Please Print on Recycled Paper.

  19. Demonstrating sustainable energy: A review-based model of sustainable energy demonstration projects

    NARCIS (Netherlands)

    Bossink, Bart

    2017-01-01

    This article develops a model of sustainable energy demonstration projects, based on a review of 229 scientific publications on demonstrations in renewable and sustainable energy. The model addresses the basic organizational characteristics (aim, cooperative form, and physical location) and learning

  20. Review of Time Management for the Research Reactor Project

    International Nuclear Information System (INIS)

    Park, Kook-Nam; Park, Su-Jin; Choi, Min-Ho; Yoon, Hyung-Mo; Kim, Hyeonil; Lee, Eung-Jae

    2016-01-01

    In this paper, the processes for the time management, which have actually been implemented for JRTR, are presented. In JRTR, a master schedule was submitted in December 2012 whereas the project was contracted in October 2010. The schedule includes fixing the Engineering Deliverable List (EDL), the list of equipment, the actual issue date, the results of Primavera, a piece of software to manage progress, the progress rate and the issuance of the schedule based on the Project level III. Afterwards JAEC approved to the extension of the schedule from 56 months to 70.5 months mainly due to late preparation of the Jordanian nuclear legislative system. The project schedule was updated up to the fifth revision to compensate the delay by recovering measures such as for design, purchase, construction, and finally the owner of the project, Jordanian Atomic Energy Commission (JAEC) approved in August 2014. Construction work, the prerequisite for commissioning stage A had been finished in February 2016, and commissioning stage A has been being performed

  1. Review of Time Management for the Research Reactor Project

    Energy Technology Data Exchange (ETDEWEB)

    Park, Kook-Nam; Park, Su-Jin; Choi, Min-Ho; Yoon, Hyung-Mo; Kim, Hyeonil [KAERI, Daejeon (Korea, Republic of); Lee, Eung-Jae [DAEWOO E and C, Seoul (Korea, Republic of)

    2016-05-15

    In this paper, the processes for the time management, which have actually been implemented for JRTR, are presented. In JRTR, a master schedule was submitted in December 2012 whereas the project was contracted in October 2010. The schedule includes fixing the Engineering Deliverable List (EDL), the list of equipment, the actual issue date, the results of Primavera, a piece of software to manage progress, the progress rate and the issuance of the schedule based on the Project level III. Afterwards JAEC approved to the extension of the schedule from 56 months to 70.5 months mainly due to late preparation of the Jordanian nuclear legislative system. The project schedule was updated up to the fifth revision to compensate the delay by recovering measures such as for design, purchase, construction, and finally the owner of the project, Jordanian Atomic Energy Commission (JAEC) approved in August 2014. Construction work, the prerequisite for commissioning stage A had been finished in February 2016, and commissioning stage A has been being performed.

  2. Project-Based Learning: A Review of the Literature

    Science.gov (United States)

    Kokotsaki, Dimitra; Menzies, Victoria; Wiggins, Andy

    2016-01-01

    Project-based learning (PBL) is an active student-centred form of instruction which is characterised by students' autonomy, constructive investigations, goal-setting, collaboration, communication and reflection within real-world practices. It has been explored in various contexts and in different phases of schooling, from primary to higher…

  3. An Approach to Tailoring Major Technical Reviews Based on Project Characteristics and Stakeholder Interests

    Science.gov (United States)

    Richstein, Alan B.; Nolte, Jerome T.; Pfarr, Barbara B.

    2004-01-01

    There are numerous technical reviews that occur throughout the systems engineering process life cycle. Many are well known by project managers and stakeholders such as developers and end users, an example of much is the critical design review (CDR). This major milestone for a large, complex new project may last two or more days, include an extensive agenda of topics, and entail hundreds of hours of developer time to prepare presentation materials and associated documents. Additionally, the weeks of schedule spent on review preparation is at least partly at the expense of other work. This paper suggests an approach for tailoring technical reviews, based on the project characteristics and the project manager s identification of the key stakeholders and understanding of their most important issues and considerations. With this insight the project manager can communicate to, manage expectations oc and establish formal agreement with the stakeholders as to which reviews, and at what depth, are most appropriate to achieve project success. The authors, coming from diverse organizations and backgrounds, have drawn on their personal experiences and summarized the best practices of their own organizations to create a common framework to provide guidance on the adaptation of design reviews to other system engineers.

  4. An Accurate and Impartial Expert Assignment Method for Scientific Project Review

    Directory of Open Access Journals (Sweden)

    Mingliang Yue

    2017-12-01

    Full Text Available Purpose: This paper proposes an expert assignment method for scientific project review that considers both accuracy and impartiality. As impartial and accurate peer review is extremely important to ensure the quality and feasibility of scientific projects, enhanced methods for managing the process are needed. Design/methodology/approach: To ensure both accuracy and impartiality, we design four criteria, the reviewers’ fitness degree, research intensity, academic association, and potential conflict of interest, to express the characteristics of an appropriate peer review expert. We first formalize the expert assignment problem as an optimization problem based on the designed criteria, and then propose a randomized algorithm to solve the expert assignment problem of identifying reviewer adequacy. Findings: Simulation results show that the proposed method is quite accurate and impartial during expert assignment. Research limitations: Although the criteria used in this paper can properly show the characteristics of a good and appropriate peer review expert, more criteria/conditions can be included in the proposed scheme to further enhance accuracy and impartiality of the expert assignment. Practical implications: The proposed method can help project funding agencies (e.g. the National Natural Science Foundation of China find better experts for project peer review. Originality/value: To the authors’ knowledge, this is the first publication that proposes an algorithm that applies an impartial approach to the project review expert assignment process. The simulation results show the effectiveness of the proposed method.

  5. Assessment of Smolt Condition for Travel Time Analysis Project, 1987-1997 Project Review.

    Energy Technology Data Exchange (ETDEWEB)

    Schrock, Robin M.; Hans, Karen M.; Beeman, John W. [US Geological Survey, Western Fisheries Research Center, Columbia River Research Laboratory, Cook, WA

    1997-12-01

    The assessment of Smolt Condition for Travel Time Analysis Project (Bonneville Power Administration Project 87-401) monitored attributes of salmonid smolt physiology in the Columbia and Snake River basins from 1987 to 1997, under the Northwest Power Planning Council Fish and Wildlife Program, in cooperation with the Smolt Monitoring Program of the Fish Passage Center. The primary goal of the project was to investigate the physiological development of juvenile salmonids related to migration rates. The assumption was made that the level of smolt development, interacting with environmental factos such as flow, would be reflected in travel times. The Fish Passage Center applied the physiological measurements of smolt condition to Water Budget management, to regulate flows so as to decrease travel time and increase survival.

  6. 42 CFR 137.294 - What is the typical IHS environmental review process for construction projects?

    Science.gov (United States)

    2010-10-01

    ... SELF-GOVERNANCE Construction Nepa Process § 137.294 What is the typical IHS environmental review... impact on the environment, and therefore do not require environmental impact statements (EIS). Under current IHS procedures, an environmental review is performed on all construction projects. During the IHS...

  7. ERG [Engineering Review Group] review of the SRP [Salt Repository Project] salt irradiation effects program: Technical report

    International Nuclear Information System (INIS)

    Clark, D.E.

    1986-11-01

    The Engineering Review Group (ERG) was established by the Office of Nuclear Waste Isolation (ONWI) to help evaluate engineering-related issues in the US Department of Energy's nuclear waste repository program. The August 1985 meeting of the ERG reviewed the Salt Repository Project (SRP) salt irradiation effects program. This report documents the ERG's comments and recommendations on these subjects and the ONWI response to the specific points raised by the ERG

  8. Academic and Institutional Review Board Collaboration to Ensure Ethical Conduct of Doctor of Nursing Practice Projects.

    Science.gov (United States)

    Foote, Jan M; Conley, Virginia; Williams, Janet K; McCarthy, Ann Marie; Countryman, Michele

    2015-07-01

    Navigating the regulations to protect human subjects and private health information for Doctor of Nursing Practice (DNP) projects can be a formidable task for students, faculty, and the institutional review board (IRB). Key stakeholders from the University of Iowa College of Nursing and the Human Subjects Office developed a standardized process for DNP students to follow, using a decision algorithm, a student orientation to the human subjects review process conducted by faculty and IRB chairs and staff, and a brief Human Subjects Research Determination form. Over 2 years, 109 students completed the process, and 96.3% of their projects were deemed not to be human subjects research. Every student submitted documentation of adherence to the standardized process. Less time was spent by students, faculty, and the IRB in preparing and processing review requests. The interprofessional collaboration resulted in a streamlined process for the timely review of DNP projects. Copyright 2015, SLACK Incorporated.

  9. Upgrading of oil palm wastes by radiation processing - project review

    International Nuclear Information System (INIS)

    Nahrul Khair Alang Md Rashid

    1998-01-01

    Early works on oil palm waste treatment at MINT started in 1984 with the objective of degrading EFB (Empty Fruit Bunches) by radiation. This idea was shared by JAERI that adopted the research project with MINT in 1986 under the Japanese Science and Technology Agency (STA) programme. The results of these preliminary works show that EFB can be degraded using gamma radiation at a dose of ranging from 500 to 1000 kGy - 50 to 100 times higher than what is considered to be the economic dose. It is generally accepted that the economics of radiation treatment process could only be realised if the treatment dose can be kept below 10 kGy, which was incidentally, during the course of this early works, found to be the pasteurisation dose for oil palm by - products. With these information, MINT and JAERI agreed to pursue further research in this area and formulated a bilateral research co-operation in radiation pasteurisation of EFB and subsequent degradation by cellulolytic fungi or mushrooms. The research has the objective of upgrading EFB, which was not considered as suitable for feed due to its known physical properties as coarse and highly fibrous, to animal feed as well as substrate for mushroom cultivation and enzyme production. In addition to the desire to provide an environment friendly method for waste disposal to a growing industry, the possibility of catalysing the development of livestock industry by commercial farming in the process is another motivation for this project. Malaysia is estimated to be only about 40% self-sufficient in beef production. Thus there is great opportunity for the growth and expansion of this industry in Malaysia. However, growth in ruminant population should not result in the alienation of land for pastures. Among the reasons for the lack of interest in livestock production through commercial farming is the unavailability of local feed material which could be cheaper than imported feed grains, particularly maize. Feed is one the main cost

  10. Upgrading of oil palm wastes by radiation processing - project review

    Energy Technology Data Exchange (ETDEWEB)

    Alang Md Rashid, Nahrul Khair [Malaysian Institute for Nuclear Technology Research (MINT), Bangi (Malaysia)

    1998-07-01

    Early works on oil palm waste treatment at MINT started in 1984 with the objective of degrading EFB (Empty Fruit Bunches) by radiation. This idea was shared by JAERI that adopted the research project with MINT in 1986 under the Japanese Science and Technology Agency (STA) programme. The results of these preliminary works show that EFB can be degraded using gamma radiation at a dose of ranging from 500 to 1000 kGy - 50 to 100 times higher than what is considered to be the economic dose. It is generally accepted that the economics of radiation treatment process could only be realised if the treatment dose can be kept below 10 kGy, which was incidentally, during the course of this early works, found to be the pasteurisationdose for oil palm by - products. With these information, MINT and JAERI agreed to pursue further research in this area and formulated a bilateral research co-operation in radiation pasteurisation of EFB and subsequent degradation by cellulolytic fungi or mushrooms. The research has the objective of upgrading EFB, which was not considered as suitable for feed due to its known physical properties as coarse and highly fibrous, to animal feed as well as substrate for mushroom cultivation and enzyme production. In addition to the desire to provide an environment friendly method for waste disposal to a growing industry, the possibility of catalysing the development of livestock industry by commercial farming in the process is another motivation for this project. Malaysia is estimated to be only about 40% self-sufficient in beef production. Thus there is great opportunity for the growth and expansion of this industry in Malaysia. However, growth in ruminant population should not result in the alienation of land for pastures. Among the reasons for the lack of interest in livestock production through commercial farming is the unavailability of local feed material which could be cheaper than imported feed grains, particularly maize. Feed is one the main cost

  11. Report of the joint review panel : Glacier Power Ltd Dunvegan Hydroelectric Project, Fairview, Alberta

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-12-19

    This paper presented the results of a review of the Dunvegan hydroelectric project proposed for development on Alberta's Peace River. In addition to stating the project's purpose, viability, and benefits, the review examined the potential environmental and socio-economic impacts of the hydroelectric project and outlined conclusions developed through consultation with participants of public hearings. The review included a study of transmission lines needed for the project, and the likely impact of the hydroelectric plant on the Peace River fishery and ice regimes. Geotechnical issues related to slope stability, sedimentation and channel morphology, seismicity, and sedimentation in the region were analyzed. The impact of the project on wildlife, vegetation and forest resources was also examined. The study also examined impacts related to health and safety. Potential cumulative effects were reviewed, and First Nations and Metis concerns were outlined. It was concluded that impacts related to the construction, operation, and decommissioning of the project are not likely to be significant. tabs., figs.

  12. Independent management and financial review, Yucca Mountain Project, Nevada. Final report

    International Nuclear Information System (INIS)

    1995-01-01

    The Yucca Mountain Project is one part of the Department of Energy's Office of Civilian Radioactive Waste Management Program (the Program) which was established by the Nuclear Waste Policy Act of 1982, and as amended in 1987. The Program's goal is to site the nation's first geologic repository for the permanent disposal of high-level nuclear waste, in the form of spent fuel rod assemblies, generated by the nuclear power industry and a smaller quantity of Government radioactive waste. The Program, which also encompasses the transportation system and the multipurpose canister system was not the subject of this Report. The subject of this Review was only the Yucca Mountain Project in Nevada. While the Review was directed toward the Yucca Mountain Project rather than the Program as a whole, there are certain elements of the Project which cannot be addressed except through discussion of some Program issues. An example is the Total System Life Cycle Cost addressed in Section 7 of this report. Where Program issues are discussed in this Report, the reader is reminded of the scope limitations of the National Association of Regulatory Utility Commissioners (NARUC) contract to review only the Yucca Mountain Project. The primary scope of the Review was to respond to the specific criteria contained in the NARUC scope of work. In responding to these criteria, the Review Team understood that some interested parties have expressed concern over the requirements of the Nuclear Waste Policy Act relative to the Yucca Mountain Project and the nature of activities currently being carried out by the Department of Energy at the Yucca Mountain Project site. The Review Team has attempted to analyze relevant portions of the Nuclear Waste Policy Act as Amended, but has not conducted a thorough analysis of this legislation that could lead to any specific legal conclusions about all aspects of it

  13. Independent management and financial review, Yucca Mountain Project, Nevada. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-15

    The Yucca Mountain Project is one part of the Department of Energy`s Office of Civilian Radioactive Waste Management Program (the Program) which was established by the Nuclear Waste Policy Act of 1982, and as amended in 1987. The Program`s goal is to site the nation`s first geologic repository for the permanent disposal of high-level nuclear waste, in the form of spent fuel rod assemblies, generated by the nuclear power industry and a smaller quantity of Government radioactive waste. The Program, which also encompasses the transportation system and the multipurpose canister system was not the subject of this Report. The subject of this Review was only the Yucca Mountain Project in Nevada. While the Review was directed toward the Yucca Mountain Project rather than the Program as a whole, there are certain elements of the Project which cannot be addressed except through discussion of some Program issues. An example is the Total System Life Cycle Cost addressed in Section 7 of this report. Where Program issues are discussed in this Report, the reader is reminded of the scope limitations of the National Association of Regulatory Utility Commissioners (NARUC) contract to review only the Yucca Mountain Project. The primary scope of the Review was to respond to the specific criteria contained in the NARUC scope of work. In responding to these criteria, the Review Team understood that some interested parties have expressed concern over the requirements of the Nuclear Waste Policy Act relative to the Yucca Mountain Project and the nature of activities currently being carried out by the Department of Energy at the Yucca Mountain Project site. The Review Team has attempted to analyze relevant portions of the Nuclear Waste Policy Act as Amended, but has not conducted a thorough analysis of this legislation that could lead to any specific legal conclusions about all aspects of it.

  14. UP1 decommissioning project: initial review of lessons learned

    International Nuclear Information System (INIS)

    Fontana, Ph.; Fraize, G.; Seurat, Ph.

    2008-01-01

    The very first French electricity-generating nuclear reactors (3 gas-graphite reactors operated between 1956 and 1984) and spent fuel reprocessing plant (UP1 and ancillary facilities operated from 1958 to 1997) were located at Marcoule, in southern France. These historic facilities, together with the research labs that contributed to the development and commissioning of the processes implemented, are being decontaminated and dismantled. Other facilities near these nuclear plants will also be shut down in the next few years: the Phenix fast breeder reactor, the Celestin reactors and other ancillary units. Because the UP1 reprocessing plant and its related facilities were used for both commercial and defense activities, a dedicated group comprising three state-owned or private companies (CEA, EdF and COGEMA) was set up as the contracting authority from 1996 to 2004. Today the CEA is the contracting authority at Marcoule and has replaced AREVA NC as the site nuclear operator. AREVA acts as prime contractor for both operation of the main facilities and engineering of the dismantling projects. (authors)

  15. UP1 decommissioning project: initial review of lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Fontana, Ph.; Fraize, G. [CEA Valrho, Dir. de l' Energie Nucleaire (DEN/DPAD), 30 - Marcoule (France); Seurat, Ph. [AREVA NC, 75 - Paris (France)

    2008-07-01

    The very first French electricity-generating nuclear reactors (3 gas-graphite reactors operated between 1956 and 1984) and spent fuel reprocessing plant (UP1 and ancillary facilities operated from 1958 to 1997) were located at Marcoule, in southern France. These historic facilities, together with the research labs that contributed to the development and commissioning of the processes implemented, are being decontaminated and dismantled. Other facilities near these nuclear plants will also be shut down in the next few years: the Phenix fast breeder reactor, the Celestin reactors and other ancillary units. Because the UP1 reprocessing plant and its related facilities were used for both commercial and defense activities, a dedicated group comprising three state-owned or private companies (CEA, EdF and COGEMA) was set up as the contracting authority from 1996 to 2004. Today the CEA is the contracting authority at Marcoule and has replaced AREVA NC as the site nuclear operator. AREVA acts as prime contractor for both operation of the main facilities and engineering of the dismantling projects. (authors)

  16. CORR Guidelines. Preparing and Conducting Review Missions of Construction Project Readiness for Nuclear Power Plants

    International Nuclear Information System (INIS)

    2013-01-01

    The construction readiness review (CORR) mission for nuclear power plant projects has been established with the aim of conducting peer reviews of construction projects related to nuclear power plants. Such a mission provides a detailed assessment of readiness for construction, construction progress, readiness for turnover, as well as recommendations for improvement. Organizations in Member States, such as nuclear utilities, owners, regulators and technical support organizations, can benefit from such reviews. A team of international experts with complementing specialities will conduct the CORR mission. The review is based on appropriate IAEA publications, such as IAEA Safety Standards Series Guides and IAEA Nuclear Energy Series publications, as well as on internationally recognized project and construction management guides. Mission findings are summarized in a mission report, which includes a list of recommendations, suggestions and identified good practices. The review is not intended to be a regulatory inspection or an audit against international codes and standards. Rather, it is a peer review aimed at improving implementation processes and procedures through an exchange of technical experiences and practices at the working level. The mission is applicable at any stage of a nuclear power plant construction project, although two specific phases are targeted: (1) start of construction mission (Phase 1 mission) and (2) an in-progress mission (Phase 2 mission). Missions are initiated when official requests are submitted by Member States through the appropriate IAEA channels

  17. EC6 design features and pre-project licensing review

    Energy Technology Data Exchange (ETDEWEB)

    Yu, S.; Lee, A.G.; Dinh, N.B.; Soulard, M. [CANDU Energy Inc., Mississauga, Ontario, (Canada)

    2013-07-01

    The Enhanced CANDU 6 (EC6) is the new Generation III CANDU reactor design that meets the most up to date Canadian regulatory requirements and customer expectations. Candu Energy Inc. is finalizing development of the EC6 which incorporates the CANDU 6's well-proven features, and adds enhancements that strengthened reactor safety margin and improved operability. The EC6 builds on the proven high performance design and the defence-in-depth features of CANDU 6 units, and has incorporated extensive operational feedback including lessons learned from Fukushima. This paper will provide status of the engineering program including progress on the pre-licensing review of the EC6 design by the Canadian Regulator, CNSC, and will also highlight the design and safety enhancements incorporated in the EC6 product. Safety enhancements to meet safety goals and to improve robustness of systems to respond to design basis accidents and beyond design basis accidents include: new severe accident recovery and heat removal system; improved emergency heat removal system; faster shutoff rods with improved safety margins; mechanical guaranteed shutdown rods; daily load cycling capability; robust containment with containment filter venting system; and improved backed-up electrical supply and cooling services. (author)

  18. 2017 GTO Project review Laboratory Evaluation of EGS Shear Stimulation.

    Energy Technology Data Exchange (ETDEWEB)

    Bauer, Stephen J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-10-01

    The objectives and purpose of this research has been to produce laboratory-based experimental and numerical analyses to provide a physics-based understanding of shear stimulation phenomena (hydroshearing) and its evolution during stimulation. Water was flowed along fractures in hot and stressed fractured rock, to promote slip. The controlled laboratory experiments provide a high resolution/high quality data resource for evaluation of analysis methods developed by DOE to assess EGS “behavior” during this stimulation process. Segments of the experimental program will provide data sets for model input parameters, i.e., material properties, and other segments of the experimental program will represent small scale physical models of an EGS system, which may be modeled. The coupled lab/analysis project has been a study of the response of a fracture in hot, water-saturated fractured rock to shear stress experiencing fluid flow. Under this condition, the fracture experiences a combination of potential pore pressure changes and fracture surface cooling, resulting in slip along the fracture. The laboratory work provides a means to assess the role of “hydroshearing” on permeability enhancement in reservoir stimulation. Using the laboratory experiments and results to define boundary and input/output conditions of pore pressure, thermal stress, fracture shear deformation and fluid flow, and models were developed and simulations completed by the University of Oklahoma team. The analysis methods are ones used on field scale problems. The sophisticated numerical models developed contain parameters present in the field. The analysis results provide insight into the role of fracture slip on permeability enhancement-“hydroshear” is to be obtained. The work will provide valuable input data to evaluate stimulation models, thus helping design effective EGS.

  19. Rethinking project management: A structured literature review with a critical look at the brave new world

    DEFF Research Database (Denmark)

    Svejvig, Per; Andersen, Peter

    2015-01-01

    This paper presents the results of a structured review of the rethinking project management (RPM) literature based on the classification and analysis of 74 contributions and in addition takes a critical look at this brave new world. Through the analysis, a total of 6 overarching categories emerged......: contextualization, social and political aspects, rethinking practice, complexity and uncertainty, actuality of projects and broader conceptualization. These categories cover a broad range of different contributions with diverse and alternative perspectives on project management. The early RPM literature dates back...

  20. Review of induced seismic hazard for Hot Dry Rock Project, Rosemanowes, Cornwall

    International Nuclear Information System (INIS)

    Skipp, B.O.; Woo, G.; Eldred, P.J.L.

    1991-01-01

    Geothermal energy installations perturb the earth's crust and so may provoke earthquakes. The 21st Dry Rock (HDR) Geothermal Project at Rosemanowes Quarry in Cornwall has given rise to low level unfelt acoustic emission and possibly small, felt earthquakes. This review of induced seismic hazard study examines the effects that the HDR Project could have on seismic events. Events which are modified by the project, in magnitude and time of occurrence, as well as those which might not have occurred at all were studied. From an examination of the literature and relevant seismicity models, a broad estimate of induced seismic hazard was established. (U.K)

  1. A cost benefit review of applying quality assurance principles to project management of environmental cleanup programs

    International Nuclear Information System (INIS)

    Oakes, T.W.

    1989-01-01

    This paper shows the cost/benefit mechanism used for applying the theory and practical aspects of QA principles as a management tool to project management of environmental cleanup projects. This includes reviewing and guidelines and requirements to determine the practical aspects of applying these requirements to environmental project management. Thus, there is a feedback loop for comparison of the cost/benefits of application of each stage of the project. The project's major stages include planning, environmental sampling, analysis of data samples, data/information management to include reporting, and follow- up, post-cleanup sampling with continued data management. A comparison is also made of the theory with the practical aspects of each of these stages

  2. Breckinridge Project, initial effort. Report XI, Volume V. Critical review of the design basis. [Critical review

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    Report XI, Technical Audit, is a compendium of research material used during the Initial Effort in making engineering comparisons and decisions. Volumes 4 and 5 of Report XI present those studies which provide a Critical Review of the Design Basis. The Critical Review Report, prepared by Intercontinental Econergy Associates, Inc., summarizes findings from an extensive review of the data base for the H-Coal process design. Volume 4 presents this review and assessment, and includes supporting material; specifically, Design Data Tabulation (Appendix A), Process Flow Sheets (Appendix B), and References (Appendix C). Volume 5 is a continuation of the references of Appendix C. Studies of a proprietary nature are noted and referenced, but are not included in these volumes. They are included in the Limited Access versions of these reports and may be reviewed by properly cleared personnel in the offices of Ashland Synthetic Fuels, Inc.

  3. Columbia Basin Fish and Wildlife Authority Project Abstracts; May 25-27, Portland, Oregon, 1997 Annual Review.

    Energy Technology Data Exchange (ETDEWEB)

    Allee, Brian J. (Columbia Basin Fish and Wildlife Authority, Portland, OR)

    1997-06-26

    Abstracts are presented from the 1997 Columbia Basin Fish and Wildlife Program Review of Projects. The purpose was to provide information and education on the approximate 127 million dollars in Northwest electric ratepayer fish and wildlife mitigation projects funded annually.

  4. A desk evaluation review of project MYA/6/015 hormonal studies on pituitary adrenal disorders. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    Snake-bite is one of the high priority health problems in Myanmar, causing high mortality and mobility rates among the rural population. In 1982 the Department of Medical Research (DMR) of the Ministry of Health launched a research programme for the comprehensive studies of snake (Russell's viper) bites and since then various research divisions of the DMR have been actively engaged in both basic and clinical studies aimed at obtaining adequate knowledge of the biochemical, clinical and pathophysiological mechanisms to guide rational management of snake-bite cases. Also, a clinical research unit has been established in a particular area where the incidence of Russell's viper bite is quite high. Project MYA/6/015 was initiated in 1989 with the objective of determining the incidence, facilitating early diagnosis and assessing the value of therapy in hypopituitarism following snake bite, through the measurements of pituitary and adreno-cortical hormones in serum and their changes in response to dynamic tests. The project was completed in July 1993. The review was undertaken upon request by the Asia and Pacific Section, to assess the overall performance of the project

  5. A desk evaluation review of project MYA/6/015 hormonal studies on pituitary adrenal disorders. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-09

    Snake-bite is one of the high priority health problems in Myanmar, causing high mortality and mobility rates among the rural population. In 1982 the Department of Medical Research (DMR) of the Ministry of Health launched a research programme for the comprehensive studies of snake (Russell`s viper) bites and since then various research divisions of the DMR have been actively engaged in both basic and clinical studies aimed at obtaining adequate knowledge of the biochemical, clinical and pathophysiological mechanisms to guide rational management of snake-bite cases. Also, a clinical research unit has been established in a particular area where the incidence of Russell`s viper bite is quite high. Project MYA/6/015 was initiated in 1989 with the objective of determining the incidence, facilitating early diagnosis and assessing the value of therapy in hypopituitarism following snake bite, through the measurements of pituitary and adreno-cortical hormones in serum and their changes in response to dynamic tests. The project was completed in July 1993. The review was undertaken upon request by the Asia and Pacific Section, to assess the overall performance of the project.

  6. Summary of literature review of risk communication: Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Byram, S.J.

    1991-05-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project will estimate radiation exposures people may have received from radioactive materials released during past operations at the Department of Energy's Hanford Site near Richland, Washington. The project is being conducted by Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The Centers for Disease Control (CDC) will use HEDR dose estimates in studies to investigate a potential link between thyroid disease and historical Hanford emissions. The HEDR Project was initiated to address public concerns about the possible health impacts from past releases of radioactive materials from Hanford. The TSP recognized early in the project that special mechanisms would be required to communicate effectively to the many different concerned audiences. To identify and develop these mechanisms, the TSP issued Directive 89-7 to PNL in May 1989. The TSP directed PNL to examine methods to communicate the causes and effects of uncertainties in the dose estimates. A literature review was conducted as the first activity in response to the TSP's directive. This report presents the results of the literature review. The objective of the literature review was to identify ''key principles'' that could be applied to develop communications strategies for the project. 26 refs., 6 figs

  7. Discourses and Theoretical Assumptions in IT Project Portfolio Management: A Review of the Literature

    DEFF Research Database (Denmark)

    Hansen, Lars Kristian

    2014-01-01

    These years increasing interest is put on IT project portfolio management (IT PPM). Considering IT PPM an interdisciplinary practice, this paper conducts a concept-based literature review of relevant articles across various research disciplines. It finds and classifies a stock of 107 relevant...

  8. Phase V storage (Project W-112) Central Waste Complex operational readiness review, final report

    International Nuclear Information System (INIS)

    Wight, R.H.

    1997-01-01

    This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included

  9. Solar Pilot Plant project review No. 9, May 4--5, 1977. CDRL item 10

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-01-01

    Drawings and illustrations for the project review are presented. These are included for the 10 MW(e) solar pilot plant, the collector subsystem, the receiver subsystem, the electrical power generation system and balance of plant, plant controls and transient analysis, availability and safety, pilot and commercial plant designs, and summary and recommendations. (MHR)

  10. 4MOST: the 4-metre Multi-Object Spectroscopic Telescope project at preliminary design review

    NARCIS (Netherlands)

    de Jong, Roelof S.; Barden, Samuel C.; Bellido-Tirado, Olga; Brynnel, Joar G.; Frey, Steffen; Giannone, Domenico; Haynes, Roger; Johl, Diana; Phillips, Daniel; Schnurr, Olivier; Walcher, Jakob C.; Winkler, Roland; Ansorge, Wolfgang R.; Feltzing, Sofia; McMahon, Richard G.; Baker, Gabriella; Caillier, Patrick; Dwelly, Tom; Gaessler, Wolfgang; Iwert, Olaf; Mandel, Holger G.; Piskunov, Nikolai A.; Pragt, Johan H.; Walton, Nicholas A.; Bensby, Thomas; Bergemann, Maria; Chiappini, Cristina; Christlieb, Norbert; Cioni, Maria-Rosa L.; Driver, Simon; Finoguenov, Alexis; Helmi, Amina; Irwin, Michael J.; Kitaura, Francisco-Shu; Kneib, Jean-Paul; Liske, Jochen; Merloni, Andrea; Minchev, Ivan; Richard, Johan; Starkenburg, Else

    2016-01-01

    We present an overview of the 4MOST project at the Preliminary Design Review. 4MOST is a major new wide-field, high-multiplex spectroscopic survey facility under development for the VISTA telescope of ESO. 4MOST has a broad range of science goals ranging from Galactic Archaeology and stellar physics

  11. Discourses and Theoretical Assumptions in IT Project Portfolio Management: A Review of the Literature (reprint)

    DEFF Research Database (Denmark)

    Hansen, Lars Kristian

    2016-01-01

    These years increasing interest is put on IT project portfolio management (IT PPM). Considering IT PPM an interdisciplinary practice, this paper conducts a concept-based literature review of relevant articles across various research disciplines. It finds and classifies a stock of 107 relevant...

  12. Review projects for the US Fusion Program: Progress report, December 1, 1984-February 28, 1987

    International Nuclear Information System (INIS)

    Ribe, F.L.

    1988-01-01

    This paper reviews projects at the University of Washington on the following topics: Magnetic Fusion Energy Program Plan (Feb. 1985); High Density Power Systems; Fusion Systems Studies; Burning Plasmas and Compact Ignition Tokamak; US Magnetic Mirror Program; and Technical Planning Activity (Jan. 1987)

  13. Phase 5 storage (Project W-112) Central Waste Complex operational readiness review, final report

    Energy Technology Data Exchange (ETDEWEB)

    Wight, R.H.

    1997-05-30

    This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included.

  14. 77 FR 58111 - Notice of Submission for OMB Review; Institute of Education Sciences; FAFSA Completion Project...

    Science.gov (United States)

    2012-09-19

    ... DEPARTMENT OF EDUCATION Notice of Submission for OMB Review; Institute of Education Sciences; FAFSA Completion Project Evaluation SUMMARY: The Institute of Education Sciences (IES) at the U.S. Department of Education (ED) is conducting a rigorous study of the Free Application for Federal Student Aid...

  15. Pep-up: A review of the Umgeni Valley Project evaulation process ...

    African Journals Online (AJOL)

    Pep-up: A review of the Umgeni Valley Project evaulation process. Tim Wright. Abstract. No Abstract. Full Text: EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT · Creative Commons License This work is licensed under a Creative Commons Attribution 3.0 License.

  16. Independent technical review of the Sandia National Laboratories Environmental Restoration Project

    International Nuclear Information System (INIS)

    1994-11-01

    An Independent Technical Review was conducted of the Environmental Restoration Project. The objective of the review was recommendations, from a commercial perspective, on a systems level path forward to safe, minimum cost and schedule project completion. The work presented represents the consensus analysis and recommendations of thirteen individuals with varied backgrounds, expertise, and experience. The ITR team recommends that the barriers to the opportunity described in the diagnosis be eliminated using an integrated DOE-Sandia system approach. Piecemeal changes will not result in the desired commercial efficiency. DOE needs to operate as the contracting agency for a Major System Acquisition. If it does not, commercial performance will not be achieved regardless of the contractor. Likewise, Sandia needs to establish and implement the necessary project structure and management systems to operate with commercial contractor like efficiency

  17. Projecting Future Heat-Related Mortality under Climate Change Scenarios: A Systematic Review

    Science.gov (United States)

    Barnett, Adrian Gerard; Wang, Xiaoming; Vaneckova, Pavla; FitzGerald, Gerard; Tong, Shilu

    2011-01-01

    Background: Heat-related mortality is a matter of great public health concern, especially in the light of climate change. Although many studies have found associations between high temperatures and mortality, more research is needed to project the future impacts of climate change on heat-related mortality. Objectives: We conducted a systematic review of research and methods for projecting future heat-related mortality under climate change scenarios. Data sources and extraction: A literature search was conducted in August 2010, using the electronic databases PubMed, Scopus, ScienceDirect, ProQuest, and Web of Science. The search was limited to peer-reviewed journal articles published in English from January 1980 through July 2010. Data synthesis: Fourteen studies fulfilled the inclusion criteria. Most projections showed that climate change would result in a substantial increase in heat-related mortality. Projecting heat-related mortality requires understanding historical temperature–mortality relationships and considering the future changes in climate, population, and acclimatization. Further research is needed to provide a stronger theoretical framework for projections, including a better understanding of socioeconomic development, adaptation strategies, land-use patterns, air pollution, and mortality displacement. Conclusions: Scenario-based projection research will meaningfully contribute to assessing and managing the potential impacts of climate change on heat-related mortality. PMID:21816703

  18. Economic Evaluation Methodology Review on KAERI's Recent Projects

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Jin Sam; Kim, Jee Young [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2012-05-15

    In technology utilization, economics evaluation is helpful to R and D program managers by giving them economic information needed to improve the usefulness of their projects. Moreover it can help them to communicate to others participants keeping all of them value-oriented minded through the whole development process. In this context, KAERI(Korea Atomic Energy Research Institute) has been performed economic evaluation on recent some projects. So, in this study, it has been made brief reviews on KAERI's economic evaluation methodology to its recent some projects of which evaluation we engage in, especially PEFP(Proton Engineering frontier Project) and SMART(Small Medium advanced ReacTor): Methodology comparison and their pros and cons

  19. A review on disaster risk mitigation in the oil and gas project

    Science.gov (United States)

    Rodhi, N. N.; Anwar, N.; Wiguna, I. P. A.

    2018-01-01

    In addition to the very complex risks, hazards potentially lead to disasters in the oil and gas projects. These risks can certainly be anticipated with the application of risk management, but an unsystematic and ineffective implementation of risk management will still bring adverse impacts. According to the eleven risk management principles in ISO 31000:2009, the application of risk management must pay attention to all aspects, both internal and external factors. Thus, this paper aims to identify variables that could affect the disaster mitigation efforts of oil and gas projects. This research began with literature study to determine the problems of risk management in oil and gas projects, so the affecting variables as the study objectives can be specified subsequently based on the literature review as well. The variables that must be considered in the efforts of disaster risk mitigation of oil and gas project are the risk factors and sustainability aspect.

  20. The Iodine Satellite (iSat) Project Development Towards Critical Design Review (CDR)

    Science.gov (United States)

    Dankanich, John W.; Selby, Michael; Polzin, Kurt A.; Kamhawi, Hani; Hickman, Tyler; Byrne, Larry

    2016-01-01

    Despite the prevalence of Small Satellites in recent years, the systems flown to date have very limited propulsion capability. SmallSats are typically secondary payloads and have significant constraints for volume, mass, and power in addition to limitations on the use of hazardous propellants or stored energy (i.e. high pressure vessels). These constraints limit the options for SmallSat maneuverability. NASA's Space Technology Mission Directorate approved the iodine Satellite flight project for a rapid demonstration of iodine Hall thruster technology in a 12U configuration under the Small Spacecraft Technology Program. The project formally began in FY15 as a partnership between NASA MSFC, NASA GRC, and Busek Co, Inc., with the Air Force supporting the propulsion technology maturation. The team is in final preparation of the Critical Design Review prior to initiating the fabrication and integration phase of the project. The iSat project is on schedule for a launch opportunity in November 2017.

  1. Stake holder involvement in the Canadian review process for uranium production projects in Northern Saskatchewan

    International Nuclear Information System (INIS)

    Underhill, D.

    2004-01-01

    This report describes the Canadian environmental review process for uranium production projects as a case study for the purpose of understanding the nature and value of stakeholder involvement in the management of radiological hazards. While the Canadian review process potentially applies to any development, this case study focuses on the assessment of the uranium projects of northern Saskatchewan conducted during the 1990's. It describes the environmental assessment (EA) conducted in the 1990's for six new uranium facilities (including mines and mills and related tailings disposal sites) planned in northern Saskatchewan. Both the Canadian federal and the Saskatchewan provincial government have extensive environmental review processes that must under law be complete before any major industrial development judged to have potential environmental impacts is undertaken within their respective territories. However, even in those instances where no clear potential environmental impacts are evident, Canadian law mandates 'if public concern about the proposal is such that a public review is desirable, the initiating department shall refer the proposal to the Minister for review by a Panel'. (Wh95) As a stakeholder under law, in both Canada and Saskatchewan, the public plays an important role in the environmental review process. To encourage participation and assist the public in its review the two governments may provide funding (as done in this review) to assist qualified individuals or groups to participant in the review process. The first section of this case study sets the scene. It describes the Saskatchewan uranium mining story, focusing on how the importance of the public stakeholder evolved to become a major component, under law, in the EA process for new uranium mines. This increase in stakeholder involvement opportunities coincided with heightened public concern for the socio-economic impacts of the projects. In the late 1980's both governments were advised by

  2. Cochrane Acute Respiratory Infections Group's Stakeholder Engagement Project identified systematic review priority areas.

    Science.gov (United States)

    Scott, Anna Mae; Clark, Justin; Dooley, Liz; Jones, Ann; Jones, Mark; Del Mar, Chris

    2018-05-22

    Cochrane Acute Respiratory Infections (ARI) Group conducts systematic reviews of the evidence for treatment and prevention of ARIs. We report the results of a prioritisation project, aiming to identify highest priority systematic review topics. The project consisted of 2 Phases. Phase 1 analysed the gap between existing RCTs and Cochrane Systematic Reviews (reported previously). Phase 2 (reported here) consisted of a two-round survey. In round 1, respondents prioritised 68 topics and suggested up to 10 additional topics; in Round 2, respondents prioritised top 25 topics from Round 1. Respondents included clinicians, researchers, systematic reviewers, allied health, patients, and carers, from 33 different countries. In Round 1, 154 respondents identified 20 priority topics, most commonly selecting topics in non-specific ARIs, influenza, and common cold. 50 respondents also collectively suggested 134 additional topics. In Round 2, 78 respondents prioritised top 25 topics, most commonly in the areas of non-specific ARIs, pneumonia and influenza. We generated a list of priority systematic review topics, to guide the Cochrane ARI Group's systematic review work for the next 24 months. Stakeholder involvement enhanced the transparency of the process, and will increase the usability and relevance of the Group's work to stakeholders. Copyright © 2018 Elsevier Inc. All rights reserved.

  3. Department of Energy review of the National Spallation Neutron Source Project

    International Nuclear Information System (INIS)

    1997-06-01

    A Department of Energy (DOE) review of the Conceptual Design Report (CDR) for the National Spallation Neutron Source (NSNS) was conducted. The NSNS will be a new high-power spallation neutron source; initially, it will operate at 1 megawatt (MW), but is designed to be upgradeable to significantly higher power, at lower cost, when accelerator and target technologies are developed for higher power. The 53-member Review Committee examined the projected cost, schedule, technical scope, and management structure described in the CDR. For each of the major components of the NSNS, the Committee determined that the project team had produced credible designs that can be expected to work well. What remains to be done is to integrate the design of these components. With the exception of the liquid mercury target, the NSNS Project will rely heavily on proven technologies and, thus, will face a relatively low risk to successful project completion. The Total Project Cost (TPC) presented to the Committee in the CDR was $1.266 billion in as-spent dollars. In general, the Committee felt that the laboratory consortium had presented a credible estimate for each of the major components but that value engineering might produce some savings. The construction schedule presented to the Committee covered six years beginning in FY 1999. The Committee questioned whether all parts of the project could be completed according to this schedule. In particular, the linac and the conventional facilities appeared to have overly optimistic schedules. The NSNS project team was encouraged to reexamine these activities and to consider a more conservative seven-year schedule. Another concern of the Committee was the management structure. In summary, the Committee felt that this Conceptual Design Report was a very credible proposal, and that there is a high probability for successful completion of this major project within the proposed budget, although the six-year proposed schedule may be optimistic

  4. Department of Energy review of the National Spallation Neutron Source Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    A Department of Energy (DOE) review of the Conceptual Design Report (CDR) for the National Spallation Neutron Source (NSNS) was conducted. The NSNS will be a new high-power spallation neutron source; initially, it will operate at 1 megawatt (MW), but is designed to be upgradeable to significantly higher power, at lower cost, when accelerator and target technologies are developed for higher power. The 53-member Review Committee examined the projected cost, schedule, technical scope, and management structure described in the CDR. For each of the major components of the NSNS, the Committee determined that the project team had produced credible designs that can be expected to work well. What remains to be done is to integrate the design of these components. With the exception of the liquid mercury target, the NSNS Project will rely heavily on proven technologies and, thus, will face a relatively low risk to successful project completion. The Total Project Cost (TPC) presented to the Committee in the CDR was $1.266 billion in as-spent dollars. In general, the Committee felt that the laboratory consortium had presented a credible estimate for each of the major components but that value engineering might produce some savings. The construction schedule presented to the Committee covered six years beginning in FY 1999. The Committee questioned whether all parts of the project could be completed according to this schedule. In particular, the linac and the conventional facilities appeared to have overly optimistic schedules. The NSNS project team was encouraged to reexamine these activities and to consider a more conservative seven-year schedule. Another concern of the Committee was the management structure. In summary, the Committee felt that this Conceptual Design Report was a very credible proposal, and that there is a high probability for successful completion of this major project within the proposed budget, although the six-year proposed schedule may be optimistic.

  5. Resource-constrained project scheduling problem: review of past and recent developments

    Directory of Open Access Journals (Sweden)

    Farhad Habibi

    2018-01-01

    Full Text Available The project scheduling problem is both practically and theoretically of paramount importance. From the practical perspective, improvement of project scheduling as a critical part of project management process can lead to successful project completion and significantly decrease of the relevant costs. From the theoretical perspective, project scheduling is regarded as one of the in-teresting optimization issues, which has attracted the attention of many researchers in the area of operations research. Therefore, the project scheduling issue has been significantly evaluated over time and has been developed from various aspects. In this research, the topics related to Re-source-Constrained Project Scheduling Problem (RCPSP are reviewed, recent developments in this field are evaluated, and the results are presented for future studies. In this regard, first, the standard problem of RCPSP is expressed and related developments are presented from four as-pects of resources, characteristics of activities, type of objective functions, and availability level of information. Following that, details about 216 articles conducted on RCPSP during 1980-2017 are expressed. At the end, in line with the statistics obtained from the evaluation of previ-ous articles, suggestions are made for the future studies in order to help the development of new issues in this area.

  6. Barriers to Implementing the ACGME Outcome Project: A Systematic Review of Program Director Surveys.

    Science.gov (United States)

    Malik, Mohammad U; Diaz Voss Varela, David A; Stewart, Charles M; Laeeq, Kulsoom; Yenokyan, Gayane; Francis, Howard W; Bhatti, Nasir I

    2012-12-01

    The Accreditation Council for Graduate Medical Education (ACGME) introduced the Outcome Project in July 2001 to improve the quality of resident education through competency-based learning. The purpose of this systematic review is to determine and explore the perceptions of program directors regarding challenges to implementing the ACGME Outcome Project. We used the PubMed and Web of Science databases and bibliographies for English-language articles published between January 1, 2001, and February 17, 2012. Studies were included if they described program directors' opinions on (1) barriers encountered when attempting to implement ACGME competency-based education, and (2) assessment methods that each residency program was using to implement competency-based education. Articles meeting the inclusion criteria were screened by 2 researchers. The grading criterion was created by the authors and used to assess the quality of each study. The survey-based data reported the opinions of 1076 program directors. Barriers that were encountered include: (1) lack of time; (2) lack of faculty support; (3) resistance of residents to the Outcome Project; (4) insufficient funding; (5) perceived low priority for the Outcome Project; (6) inadequate salary incentive; and (7) inadequate knowledge of the competencies. Of the 6 competencies, those pertaining to patient care and medical knowledge received the most responses from program directors and were given highest priority. The reviewed literature revealed that time and financial constraints were the most important barriers encountered when implementing the ACGME Outcome Project.

  7. Key factors of project success in family small and medium-sized companies: the theoretical review

    Directory of Open Access Journals (Sweden)

    Sinisa Arsic

    2017-10-01

    Full Text Available The paper proposes a systematization of the key success factors of projects, through the theoretical review of family-owned companies operating in the EU market. It is the small and medium companies that in their own way contribute to the overall success of the national economy in terms of economic activity, increased employment, development activities and defining better business environment. The theoretical review observed numerous studies of family businesses, and the contribution of this work is in the systematization of the results of previous research – over three horizons, i.e., over the role of managers in the creation of successful projects (or owner if it is a family enterprise, institutional support for companies in Serbia and the EU, specific industries and the parent (regional markets where a family company operates. Project management, as a general representation of the concept of implementation of strategic and operational endeavors, contains many specifics in terms of critical success factors of projects depending on the environment in which they are implemented. The goal of the paper is reflected in the identification and presentation of critical success factors of projects implemented in family companies. The paper concludes with a discussion of the research results in relation to the existing, similar research studies, as well as with the announcement of future research, which will examine the conclusions drawn on a real sample.

  8. Ethics Review for a Multi-Site Project Involving Tribal Nations in the Northern Plains.

    Science.gov (United States)

    Angal, Jyoti; Petersen, Julie M; Tobacco, Deborah; Elliott, Amy J

    2016-04-01

    Increasingly, Tribal Nations are forming ethics review panels, which function separately from institutional review boards (IRBs). The emergence of strong community representation coincides with a widespread effort supported by the U.S. Department of Health & Human Services and other federal agencies to establish a single IRB for all multi-site research. This article underscores the value of a tribal ethics review board and describes the tribal oversight for the Safe Passage Study-a multi-site, community-based project in the Northern Plains. Our experience demonstrates the benefits of tribal ethics review and makes a strong argument for including tribal oversight in future regulatory guidance for multi-site, community-based research. © The Author(s) 2016.

  9. Design review report: 200 East upgrades for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's 200 East (200E) Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314 is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farm waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first design package (AN Valve Pit Upgrades) was completed in November 1997, and the associated design verification activities are documented in HNF-1893. The second design package, 200 East (200E) Upgrades, was completed in March 1998. This design package identifies modifications to existing valve pits 241-AX-B and 241-A-B, as well as several new waste transfer pipelines to be constructed within the A Farm Complex of the 200E Area. The scope of the valve pit modifications includes new pit cover blocks, valve

  10. Review of the groundwater flow modelling of the Swiss Project Gewaehr

    International Nuclear Information System (INIS)

    Robinson, P.C.; Jackson, C.P.; Herbert, A.W.; Atkinson, R.

    1986-02-01

    The authors review the hydrogeological modelling work undertaken by NAGRA (National Co-operative for the Storage of Radioactive Waste) for Project Gewahr (Guarantee). The FEM301 computer code that was used by NAGRA, their general approach to flow simulation and the specific finite-element models employed are all discussed; and the results of a verification are presented using the authors' own computer code NAMMU. Recommendations for improvements in the NAGRA modelling and for areas of future work are made. (author)

  11. The 1991 DOE/Sandia Crystalline Photovoltaic Technology Project Review Meeting

    Science.gov (United States)

    Whipple, M. L.

    1991-07-01

    This document serves as the proceedings for the manual project review meeting held by Sandia's Photovoltaic Technology Research Division. It contains information supplied by each organization making a presentation at the meeting, which was held July 30 through 31, 1991 at the Sheraton Hotel in Albuquerque, New Mexico. Sessions were held to discuss national photovoltaic programs, one-sun crystalline silicon cell research, concentrator silicon cell research, and concentrating collector development.

  12. The Iodine Satellite (iSat) Project Development Towards Critical Design Review

    Science.gov (United States)

    Dankanich, John W.; Calvert, Derek; Kamhawi, Hani; Hickman, Tyler; Szabo, James; Byrne, Lawrence

    2015-01-01

    Despite the prevalence of small satellites in recent years, the systems flown to date have very limited propulsion capability. SmallSats are typically secondary payloads and have significant constraints for volume, mass, and power in addition to limitations on the use of hazardous propellants or stored energy. These constraints limit the options for SmallSat maneuverability. NASA's Space Technology Mission Directorate approved the iodine Satellite flight project for a rapid demonstration of iodine Hall thruster technology in a 12U (cubesat units) configuration under the Small Spacecraft Technology Program. The mission is a partnership between NASA MSFC, NASA GRC, and Busek Co, Inc., with the Air Force supporting the propulsion technology maturation. The team is working towards the critical design review in the final design and fabrication phase of the project. The current design shows positive technical performance margins in all areas. The iSat project is planned for launch readiness in the spring of 2017.

  13. Review of issues and challenges for public private partnership (PPP) project performance in Malaysia

    Science.gov (United States)

    Hashim, H.; Che-Ani, A. I.; Ismail, K.

    2017-10-01

    Public Private Partnership (PPP) in Malaysia aims to stimulate economic growth and overcome the weakness of conventional system. Over the years, many critics have been reported along the massive growth of PPP project development. Within that context, this study provides a review of issues and challenges for PPP pertaining to project performance in Malaysia. The study also attempts to investigate four performance measurement models around the globe as a basis for improvement of PPP in Malaysia. A qualitative method was used to analyse literature review from previous published literatures while comparative analysis was carried out within the models to identify their advantages and disadvantages. The findings show that the issues and challenges occurred were related to human, technical and financial factor that could hinder the implementation of PPP project in Malaysia. From the analysis, KPIs, guideline / framework, risk allocation, efficiency & flexibility are perceived as dominant issues. Finally, the findings provide an informed basis on the opportunity areas to be considered for improvement in order to achieved project effectiveness.

  14. The International Science and Technology Center (ISTC) and ISTC projects related to research reactors: information review

    Energy Technology Data Exchange (ETDEWEB)

    Tocheniy, L. V.; Rudneva, V. Ya. [ISTC, Moscow (Russian Federation)

    1998-07-01

    The ISTC is an intergovernmental organization established by agreement between the Russian Federation, the European Union, Japan, and the United States. Since 1994, Finland, Sweden, Norway, Georgia, Belarus, Kazakhstan and the Kyrgyz Republic have acceded to the Agreement and Statute. At present, the Republic of Korea is finishing the process of accession to the ISTC. All work of the ISTC is aimed at the goals defined in the ISTC Agreement: To give CIS weapons scientists, particularly those who possess knowledge and skills related to weapons of mass destruction and their delivery systems, the opportunities to redirect their talents to peaceful activities; To contribute to solving national and international technical problems; To support the transition to market-based economics; To support basic and applied research; To help integrate CIS weapons scientists into the international scientific community. The projects may be funded both through governmental funds of the Funding partners of the ISTC. According to the ISTC Statute, approved by the appropriate national organizations, funds used within ISTC projects are exempt from CIS taxes. As of March 1998, more than 1500 proposals had been submitted to the Center, of which 551 were approved for funding, for a total value of approximately US$166 million. The number of scientists and engineers participating in the projects is more than 18000. There are about 20 funded and as yet nonfunded projects related to various problems of research reactors. Many of them address safety issues. Information review of the results and plans of both ongoing projects and as yet nonfunded proposals related to research reactors will be presented with the aim assisting international researchers to establish partnerships or collaboration with ISTC projects. The following groups of ISTC projects will be represented: 1. complex computer simulator s for research reactors; 2. reactor facility decommissioning; 3. neutron sources for medicine; 4

  15. The development of biodiversity conservation measures in China's hydro projects: A review.

    Science.gov (United States)

    Bai, Ruiqiao; Liu, Xuehua; Liu, Xiaofei; Liu, Lanmei; Wang, Jianping; Liao, Sihui; Zhu, Annah; Li, Zhouyuan

    2017-11-01

    The hydropower capacity of China ranks first in the world and accounts for approximately 20% of the total energy production in the country. While hydropower has substantially contributed to meeting China's renewable energy targets and providing clean energy to rural areas, the development of hydropower in China has been met with significant controversy. Ecologically, hydro projects alter the landscape, with potential impacts to the country's aquatic biodiversity. Over the past four decades in China, various mainstream opinions and misunderstandings have been presented concerning how to alleviate the negative impacts of hydro projects on aquatic ecosystems. This article reviews research concerning potential mitigation measures to enhance aquatic biodiversity conservation in hydro projects in China. Based on the academic attention such research has attracted, three technical measures for aquatic biodiversity conservation are considered: (1) fish passages, (2) restocking efforts and (3) river and lake renovations. This article provides a historical comparison of these three practices in China to demonstrate the advantages and disadvantages of each method. The article also reviews the relevant legislation, regulations and technical guidelines concerning China's hydro projects dating back to 1979. The dynamics in research, publications, and patents concerning these three mitigation measures are summarized to demonstrate their technological developments in the context of legislative and policy advances. Data were gathered through the China Knowledge Resource Integrated Database and the State Intellectual Property Office of the People's Republic of China. Based on the analysis provided, the article recommends an expansion of China's environmental certification system for hydro projects, more robust regional legislation to bolster the national framework, the cooperation between upstream and downstream conservation mechanisms, and better monitoring to determine the efficacy

  16. The Ongkharak Nuclear Research Center (ONRC) research reactor project: a status review

    International Nuclear Information System (INIS)

    Rusch, R.; Jacobi, A. Jr.; Yamkate, P.

    2001-01-01

    The new Ongkharak Nuclear Research Center in the vicinity of Bangkok, Thailand is planned to replace the more than 30 years old facilities located in the Chatuchak district, Bangkok. An international team led by general atomics (GA) is designing and constructing the new research complex. It comprises a 10 MW TRIGA type reactor, an isotope production and a centralized waste processing and storage facility. Electrowatt-Ekono Ltd. was hired by the Thai Government Agency, the Office of Atomic Energy for Peace (OAEP), as a consultant to the project. As the project is now approaching the end of its 4 th year, it now stands at a decisive turning point. Basic design is nearly completed and detailed design is well advanced. The turnkey part of the contract including the reactor island, the isotope and waste facilities are still awaiting the issuance of the Construction Permit. Significant progress has been made on the other part of the project, which includes all the supporting infrastructure facilities. The Preliminary Safety Analysis Report (PSAR), prepared by GA, has been reviewed by various parties, including by nuclear safety experts from the IAEA, which has provided continuous support to the OAEP. Experts from the Argonne National Laboratory have been involved in the reviews as well. The PSAR is now under consideration at the Nuclear Facility Safety Sub-Committee (NFSS) of the Thai Atomic Energy for Peace Commission for issuing the Construction Permit of the ONRC Research Reactor. The following paper gives an overview of the project and its present status, outlining the features of the planned facilities and the issues the project is presently struggling with. Major lessons of the past 4 years are highlighted and an outlook into the future is attempted. (orig.)

  17. Compilation of reports of the Advisory Committee on Reactor Safeguards, 1957-1984. Volume 1. Project Reviews A-F

    International Nuclear Information System (INIS)

    1985-04-01

    This six-volume compilation contains over 1000 reports prepared by the Advisory Committee on Reactor Safeguards from September 1957 through December 1984. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and within project name by chronological order. Part 2 categorizes the reports by the most appropriate generic subject area and within subject area by chronological order. This volume contains project reviews arranged alphabetically from A to F

  18. Focal relationships and the environment of project marketing. A literature review with suggestions for practitioners and future research

    DEFF Research Database (Denmark)

    Skaates, Maria Anne; Tikkanen, Henrikki

    2000-01-01

    of the review is upon the connection between focal relationships and the wider environment in which project marketing and systems selling takes place. First, several common definitions of projects and project marketing are presented and discussed. Second, the implications of three specific features of project......Project marketing is an important mode of business-to-business marketing today. This paper assesses recent project marketing contributions, including predominantly those of members of the (mainly European) International Network for Project Marketing and Systems Selling (INPM). The emphasis...... business - discontinuity, uniqueness, and complexity - for the focal relationship and the broader marketing environment are considered at the level of multiple projects. Third, three overlapping types of postures that project-selling firms can adopt in relation to their focal relationships...

  19. A review of risk management process in construction projects of developing countries

    Science.gov (United States)

    Bahamid, R. A.; Doh, S. I.

    2017-11-01

    In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.

  20. Athens automation and control experiment project review meeting, Dallas, Texas, December 5-6, 1984

    Energy Technology Data Exchange (ETDEWEB)

    Detwiler, J.S.; Hu, P.S.; Lawler, J.S.; Markel, L.C.; McIntyre, J.M.; McKinley, K.F.; Monteen, L.D.; Purucker, S.L.; Reed, J.H.; Rizy, D.T.

    1985-12-01

    The AACE is an electric power distribution automation project involving research and development of both hardware and software. Equipment for the project is being installed on the electric distribution system of the Athens Utilities Board (AUB), located in Athens, Tennessee. Purposes of the AACE are to develop and test load control, volt/var control, and system reconfiguration capabilities on an electric distribution system and to transfer what is learned to the electric utility industry. Expected benefits include deferral of costly power generation plants and increased electric service reliability. A project review meeting was held to review the progress of the AACE and to communicate the objectives and experimental plans to the electric utility industry. At the time of the meeting, the experimental test plans were being written; much of the AACE field equipment had been received by AUB, and installation had begun. A computer system, the AACE Test System (AACETS), was already operational at ORNL. AACETS will be used to develop and test applications software and experimental control strategies prior to their implementation on the AUB system. The AACE experiments are scheduled to begin in October 1985 and to continue through October 1987.

  1. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  2. Reviews on current carbon emission reduction technologies and projects and their feasibilities on ships

    Science.gov (United States)

    Wang, Haibin; Zhou, Peilin; Wang, Zhongcheng

    2017-06-01

    Concern about global climate change is growing, and many projects and researchers are committed to reducing greenhouse gases from all possible sources. International Maritime (IMO) has set a target of 20% CO2 reduction from shipping by 2020 and also presented a series of carbon emission reduction methods, which are known as Energy Efficiency Design Index (EEDI) and Energy Efficiency Operation Indicator (EEOI). Reviews on carbon emission reduction from all industries indicate that, Carbon Capture and Storage (CCS) is an excellent solution to global warming. In this paper, a comprehensive literature review of EEDI and EEOI and CCS is conducted and involves reviewing current policies, introducing common technologies, and considering their feasibilities for marine activities, mainly shipping. Current projects are also presented in this paper, thereby illustrating that carbon emission reduction has been the subject of attention from all over the world. Two case ship studies indicate the economic feasibility of carbon emission reduction and provide a guide for CCS system application and practical installation on ships.

  3. Systematic Review Methodology for the Fatigue in Emergency Medical Services Project.

    Science.gov (United States)

    Patterson, P Daniel; Higgins, J Stephen; Weiss, Patricia M; Lang, Eddy; Martin-Gill, Christian

    2018-02-15

    Guidance for managing fatigue in the Emergency Medical Services (EMS) setting is limited. The Fatigue in EMS Project sought to complete multiple systematic reviews guided by seven explicit research questions, assemble the best available evidence, and rate the quality of that evidence for purposes of producing an Evidence Based Guideline (EBG) for fatigue risk management in EMS operations. We completed seven systematic reviews that involved searches of six databases for literature relevant to seven research questions. These questions were developed a priori by an expert panel and framed in the Population, Intervention, Comparison, and Outcome (PICO) format and pre-registered with PROSPERO. Our target population was defined as persons 18 years of age and older classified as EMS personnel or similar shift worker groups. A panel of experts selected outcomes for each PICO question as prescribed by the Grading of Recommendations, Assessment, Development, and Evaluation (GRADE) methodology. We pooled findings, stratified by study design (experimental vs. observational) and presented results of each systematic review in narrative and quantitative form. We used meta-analyses of select outcomes to generate pooled effects. We used the GRADE methodology and the GRADEpro software to designate a quality of evidence rating for each outcome. We present the results for each systematic review in accordance with the Preferred Reporting Items for Systematic reviews and Meta-Analyses (PRISMA). More than 38,000 records were screened across seven systematic reviews. The median, minimum, and maximum inter-rater agreements (Kappa) between screeners for our seven systematic reviews were 0.66, 0.49, and 0.88, respectively. The median, minimum, and maximum number of records retained for the seven systematic reviews was 13, 1, and 100, respectively. We present key findings in GRADE Evidence Profile Tables in separate publications for each systematic review. We describe a protocol for

  4. Independent technical reviews for groundwater and soil remediation projects at US Department Of Energy sites - 59188

    International Nuclear Information System (INIS)

    Kaback, Dawn S.; Chamberlain, Grover; Morse, John G.; Petersen, Scott W.

    2012-01-01

    The US Department of Energy Office of Environmental Management has supported independent technical reviews of soil and groundwater projects at multiple DOE sites over the last 10 years. These reviews have resulted in significant design improvements to remedial plans that have accelerated cleanup and site closure. Many have also resulted in improved understanding of complex subsurface conditions, promoting better approaches to design and implementation of new technologies. Independent technical reviews add value, because they provide another perspective to problem solving and act as a check for especially challenging problems. By bringing in a team of independent experts with a broad experience base, alternative solutions are recommended for consideration and evaluation. In addition, the independence of the panel is significant, because it is able to address politically sensitive issues. The expert panel members typically bring lessons learned from other sites to help solve the DOE problems. In addition, their recommendations at a particular site can often be applied at other sites, making the review even more valuable. The review process can vary, but some common lessons ensure a successful review: - Use a multi-disciplinary broadly experienced team; - Engage the panel early and throughout the project; - Involve regulators and stakeholders in the workshop, if appropriate. - Provide sufficient background information; - Close the workshop with a debriefing followed by a written report. Many groundwater remediation challenges remain at DOE sites. Independent technical reviews have and will ensure that the best capabilities and experience are applied to reduce risks and uncertainties. Even though the groundwater remediation industry has developed significantly over the last twenty years, advancements are needed to address the complexities of the subsurface at the DOE sites. These advancements have tremendous potential to save millions of dollars and to accelerate the

  5. Environmental-impact assessment of dams and reservoir projects (review and a case study)

    International Nuclear Information System (INIS)

    Shah, S.M.

    2009-01-01

    Dams and reservoirs are among one of the most sensitive of all development Project, in terms of pervasiveness of their influence in altering the environmental conditions and resources. In the present study, major dams and reservoir projects are reviewed, from the environmental point of view. Dams and Reservoir projects bring about major changes in the immediate environment, thus affecting public health, settlements, farmlands, roads and historical sites. Impacts on human population and wildlife may be profound. Tropical diseases, involving fresh-water hosts or vectors in their transmission, are often common around new reservoirs. Large lakes create limnological changes, excessive evaporation, seepage, disturbance in water-table and increased tendencies of landslides and earthquakes. Micro climatic changes are possible, such as fog formation, increased cloudiness and modified rainfall-patterns. Retention of sediment results in silting up of reservoirs. Water shortages on mountain rivers may leave unsightly dry river-beds below a dam. Sediment deposition and growth of vegetation in reservoir affects the water-extraction for navigation power-generation and fishing. Various dams and reservoir projects in the world are critically studied, in terms of creating environmental impacts. The Kala Bagh Dam project (Pakistan), which is ready for construction, has been analysed as a case study, by matrix method. Analyses show that adverse effects of this dam are less than the benefits. It is recommended that based on the experience, appropriate lines and strategies may be drawn up to evaluate the local projects. Multidisciplinary experts need to be involved, for assessing environmental impacts and suggesting mitigation measures, to combat the adverse effects. (author)

  6. The Great Bear Flare Pit Project : review of work to date

    International Nuclear Information System (INIS)

    Ridal, J.; Lean, D.; Findlay, S.C.

    1998-01-01

    Published information regarding potential toxic agents associated with flare emissions and a study to determine the risk posed to Treaty 8 First Nations (T8FN) peoples and wildlife was reviewed as part of the Great Bear Flare Pit Project (GBFPP). The project is concerned with the study of water and soil contamination in the immediate vicinity of flare pits in the Del Rio, Doig basin, Blueberry River, and Halfway River regions of T8FN lands in Alberta. The GBFPP has established good baseline data on metal contamination, and other contaminants such as benzene, toluene, ethylbenzene, xylenes (BTEX) and polycyclic aromatic hydrocarbons (PAHs) in the immediate vicinity of selected flare pits. Based on a critical assessment of reports published to date a series of prioritized recommendations for further research are made. 18 refs., 2 tabs

  7. Review of the TMI-2 accident evaluation and vessel investigation projects

    Energy Technology Data Exchange (ETDEWEB)

    Ladekarl Thomsen, Knud

    1998-03-01

    The results of the TMI-2 Accident Evaluation Programme and the Vessel Investigation Project have been reviewed as part of a literature study on core meltdown and in-vessel coolability. The emphasis is placed on the late phase melt progression, which is of special relevance to the NKS-sponsored RAK-2.1 project on Severe Accident Phenomenology. The body of the report comprises three main sections, The TMI-2 Accident Scenario, Core Region and Relocation Path Investigations, and Lower Head Investigations. In the final discussion, the lower head gap formation mechanism is explained in terms of thermal contraction and fracturing of the debris crust. This model seems more plausible than the MAAP model based on creep expansion of the lower head. (au) 1 tab., 33 ills., 31 refs.

  8. Review: Barr, Michael and Zlatko Skrbiš (2008, Constructing Singapore. Elitism, Ethnicity and the Nation-Building Project

    Directory of Open Access Journals (Sweden)

    Boris Michel

    2009-01-01

    Full Text Available Review of the monograph: Barr, Michael and Zlatko Skrbiš, Constructing Singapore. Elitism, Ethnicity and the Nation-Building Project, Copenhagen: NIAS Press, 2008, ISBN 978-87-7694-029-4, 304 pages

  9. Using Model-Based System Engineering to Provide Artifacts for NASA Project Life-Cycle and Technical Reviews Presentation

    Science.gov (United States)

    Parrott, Edith L.; Weiland, Karen J.

    2017-01-01

    This is the presentation for the AIAA Space conference in September 2017. It highlights key information from Using Model-Based Systems Engineering to Provide Artifacts for NASA Project Life-cycle and Technical Reviews paper.

  10. Review, reaction, and projection: the role of the CFO in planning.

    Science.gov (United States)

    Nauert, R C

    1985-08-01

    In recent years, CFOs have become an integral part of the healthcare organization's strategic planning process. Although not the leader in the process, CFOs should assume a role of review, reaction, and projection. Furthermore, they should oppose any venture that would weaken the financial strength of the institution--whether or not they support the venture on social grounds. The CFO's responsibility in planning is to improve the financial strength of the organization, using support documentation, thorough preparation, and logic. The CEO's concern for community needs and desire to pursue a new business should be tempered by the CFO's financial and economic judgment.

  11. Errors, lies and misunderstandings: Systematic review on behavioural decision making in projects

    DEFF Research Database (Denmark)

    Stingl, Verena; Geraldi, Joana

    2017-01-01

    limitations—errors), pluralist (on political behaviour—lies), and contextualist (on social and organizational sensemaking—misunderstandings). Our review suggests avenues for future research with a wider coverage of theories in cognitive and social psychology and critical and mindful integration of findings...... in projects and beyond. However, the literature is fragmented and draws only on a fraction of the recent, insightful, and relevant developments on behavioural decision making. This paper organizes current research in a conceptual framework rooted in three schools of thinking—reductionist (on cognitive...

  12. Identification of suicidal ideations with the help of projective tests: a review.

    Science.gov (United States)

    Kumar, Devvarta; Nizamie, S Haque; Abhishek, Priyadarshee; Prasanna, Lavanya Tumkur

    2014-12-01

    Identification of the presence of suicidal ideations in an individual is crucial for the timely intervention. However, these ideations may remain unidentified as an individual with serious intentions of self-harm may not express them explicitly. Various projective tests can provide crucial clues to clinicians about the presence of suicidal ideations in an individual's mind. The present review is intended to update clinicians working in the field of suicide prevention about salient findings on these tests which can serve as a ready reckoner for them. We also highlight the status of research in this domain. Copyright © 2014 Elsevier B.V. All rights reserved.

  13. Using Vector Projection Method to evaluate maintainability of mechanical system in design review

    International Nuclear Information System (INIS)

    Chen Lu; Cai Jianguo

    2003-01-01

    Maintainability of a mechanical system is one of the system design parameters that has a great impact in terms of ease of maintenance. In this article, based on the definition of the terms of maintenance and maintainability, an important tool of Design for Maintenance is developed as a way to improve maintainability through design. A set of standard and organized guidelines is provided and maintainability factors in terms of physical design, logistics support and ergonomics are identified. As a specific application of design review, a methodology so called Vector Projection Method is developed to evaluate the maintainability of the mechanical system. Lastly, an example is discussed

  14. River Protection Project Integrated safety management system phase II verification review plan - 7/29/99

    International Nuclear Information System (INIS)

    SHOOP, D.S.

    1999-01-01

    The purpose of this review is to verify the implementation status of the Integrated Safety Management System (ISMS) for the River Protection Project (RPP) facilities managed by Fluor Daniel Hanford, Inc. (FDH) and operated by Lockheed Martin Hanford Company (LMHC). This review will also ascertain whether within RPP facilities and operations the work planning and execution processes are in place and functioning to effectively protect the health and safety of the workers, public, environment, and federal property over the RPP life cycle. The RPP ISMS should support the Hanford Strategic Plan (DOERL-96-92) to safely clean up and manage the site's legacy waste and deploy science and technology while incorporating the ISMS central theme to ''Do work safely'' and protect human health and the environment

  15. First NASA Aviation Safety Program Weather Accident Prevention Project Annual Review

    Science.gov (United States)

    Colantonio, Ron

    2000-01-01

    The goal of this Annual Review was to present NASA plans and accomplishments that will impact the national aviation safety goal. NASA's WxAP Project focuses on developing the following products: (1) Aviation Weather Information (AWIN) technologies (displays, sensors, pilot decision tools, communication links, etc.); (2) Electronic Pilot Reporting (E-PIREPS) technologies; (3) Enhanced weather products with associated hazard metrics; (4) Forward looking turbulence sensor technologies (radar, lidar, etc.); (5) Turbulence mitigation control system designs; Attendees included personnel from various NASA Centers, FAA, National Weather Service, DoD, airlines, aircraft and pilot associations, industry, aircraft manufacturers and academia. Attendees participated in discussion sessions aimed at collecting aviation user community feedback on NASA plans and R&D activities. This CD is a compilation of most of the presentations presented at this Review.

  16. The International Science and Technology Center (ISTC) and ISTC projects related to research reactors. Information review

    International Nuclear Information System (INIS)

    Tocheniy, L.; Rudneva, V.Ya.

    1998-01-01

    1. ISTC - history, activities, outlook: The ISTC is an intergovernmental organization established by agreement between the Russian Federation, the European Union, Japan, and the United States. Since 1994, Finland, Sweden, Norway, Georgia, Armenia, Belarus, Kazakhstan and the Kyrgyz Republic have acceded to the Agreement and Statute. At present, the Republic of Korea is finishing the process of accession to the ISTC. All work of the ISTC is aimed at the goals defined in the ISTC Agreement: - To give CIS weapons scientists, particularly those who possess knowledge and skills related to weapons of mass destruction and their delivery systems, the opportunities to redirect their talents to peaceful activities; - To contribute to solving national and international technical problems; - To support the transition to market-based economies; - To support basic and applied research; - To help integrate CIS weapons scientists into the international scientific community. The projects may be funded both through governmental funds of the Funding Parties specified for the ISTC, and by organizations, nominated as Funding Partners of the ISTC. According to the ISTC Statute, approved by the appropriate national organizations, funds used within ISTC projects are exempt from CIS taxes. As of March 1998, more than 1500 proposals had been submitted to the Center, of which 541 were approved for funding, for a total value of approximately US dollars 165 million. The number of scientists and engineers participating in the projects is more than 17,000. 2. Projects Related to Research Reactors: There are about 20 funded and as yet non-funded projects related to various problems of research reactors. Many of them address safety issues. Information review of the results and plans of both ongoing projects and as yet non-funded proposals related to research reactors will be presented with the aim assisting international researchers to establish partnerships or collaboration with ISTC projects

  17. Review of Project SAFE: Comments on biosphere conceptual model description and risk assessment methodology

    Energy Technology Data Exchange (ETDEWEB)

    Klos, Richard; Wilmot, Roger [Galson Sciences Ltd (United Kingdom)

    2002-09-01

    The Swedish Nuclear Fuel and Waste Management Company's (SKB's) most recent assessment of the safety of the Forsmark repository for low-level and intermediate-level waste (Project SAFE) is currently undergoing review by the Swedish regulators. As part of its review, the Swedish Radiation Protection Institute (SSI) identified that two components of SAFE require more detailed review: (i) the conceptual model description of the biosphere system, and (ii) SKB's risk assessment methodology. We have reviewed the biosphere system interaction matrix and how this has been used in the identification, justification and description of biosphere models for radiological assessment purposes. The risk assessment methodology has been reviewed considering in particular issues associated with scenario selection, assessment timescale, and the probability and risk associated with the well scenario. There is an extensive range of supporting information on which biosphere modelling in Project SAFE is based. However, the link between this material and the biosphere models themselves is not clearly set out. This leads to some contradictions and mis-matches between description and implementation. One example concerns the representation of the geosphere-biosphere interface. The supporting description of lakes indicates that interaction between groundwaters entering the biosphere through lake bed sediments could lead to accumulations of radionuclides in sediments. These sediments may become agricultural areas at some time in the future. In the numerical modelling of the biosphere carried out in Project SAFE, the direct accumulation of contaminants in bed sediments is not represented. Application of a more rigorous procedure to ensure numerical models are fit for purpose is recommended, paying more attention to issues associated with the geosphere-biosphere interface. A more structured approach to risk assessment would be beneficial, with a better explanation of the difference

  18. Review of Project SAFE: Comments on biosphere conceptual model description and risk assessment methodology

    International Nuclear Information System (INIS)

    Klos, Richard; Wilmot, Roger

    2002-09-01

    The Swedish Nuclear Fuel and Waste Management Company's (SKB's) most recent assessment of the safety of the Forsmark repository for low-level and intermediate-level waste (Project SAFE) is currently undergoing review by the Swedish regulators. As part of its review, the Swedish Radiation Protection Institute (SSI) identified that two components of SAFE require more detailed review: (i) the conceptual model description of the biosphere system, and (ii) SKB's risk assessment methodology. We have reviewed the biosphere system interaction matrix and how this has been used in the identification, justification and description of biosphere models for radiological assessment purposes. The risk assessment methodology has been reviewed considering in particular issues associated with scenario selection, assessment timescale, and the probability and risk associated with the well scenario. There is an extensive range of supporting information on which biosphere modelling in Project SAFE is based. However, the link between this material and the biosphere models themselves is not clearly set out. This leads to some contradictions and mis-matches between description and implementation. One example concerns the representation of the geosphere-biosphere interface. The supporting description of lakes indicates that interaction between groundwaters entering the biosphere through lake bed sediments could lead to accumulations of radionuclides in sediments. These sediments may become agricultural areas at some time in the future. In the numerical modelling of the biosphere carried out in Project SAFE, the direct accumulation of contaminants in bed sediments is not represented. Application of a more rigorous procedure to ensure numerical models are fit for purpose is recommended, paying more attention to issues associated with the geosphere-biosphere interface. A more structured approach to risk assessment would be beneficial, with a better explanation of the difference between

  19. Compilation of reports of the Advisory Committee on Reactor Safeguards, 1957-1984. Volume 2. Project Reviews G-P

    International Nuclear Information System (INIS)

    1985-04-01

    This six-volume compilation contains over 1000 reports prepared by the Advisory Committee on Reactor Safeguards from September 1957 through December 1984. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and within project name by chronological order. Part 2 categorizes the reports by the most appropriate generic subject area and within subject area by chronological order

  20. Review on the Projections of Future Storminess over the North Atlantic European Region

    Directory of Open Access Journals (Sweden)

    Tina Mölter

    2016-04-01

    Full Text Available This is an overview of the results from previously published climate modeling studies reporting on projected aspects of future storminess over the North Atlantic European region (NAER in the period 2020–2190. Changes in storminess are summarized for seven subregions in the study area and rated by a categorical evaluation scheme that takes into account emission scenarios and modeling complexity in the reviewed studies. Although many of the reviewed studies reported an increase in the intensity of high-impact wind speed and extreme cyclone frequency in the second half of the 21st century, the projections of aspects of future storminess over the NAER differed regionally. There is broad consensus that the frequency and intensity of storms, cyclones, and high-impact wind speed will increase over Central and Western Europe, and these changes will probably have the potential to produce more damage. In contrast, future extratropical storminess over Southern Europe is very likely to decrease. For Northern and Eastern Europe the results of the evaluation are inconclusive, because there is an indication of increasing as well as decreasing development of the evaluated aspects of future storminess. Concerning the storm track, we found indications of a likely north- and eastward shift in most assessed studies. Results from three studies suggest a northeastward shift of the North Atlantic Oscillation.

  1. Projecting changes in the distribution and productivity of living marine resources: A critical review of the suite of modelling approaches used in the large European project VECTORS

    NARCIS (Netherlands)

    Peck, Myron A.; Arvanitidis, Christos; Butenschön, Momme; Canu, Donata Melaku; Chatzinikolaou, Eva; Cucco, Andrea; Domenici, Paolo; Fernandes, Jose A.; Gasche, Loic; Huebert, Klaus B.; Hufnagl, Marc; Jones, Miranda C.; Kempf, Alexander; Keyl, Friedemann; Maar, Marie; Mahévas, Stéphanie; Marchal, Paul; Nicolas, Delphine; Pinnegar, John K.; Rivot, Etienne; Rochette, Sébastien; Sell, Anne F.; Sinerchia, Matteo; Solidoro, Cosimo; Somerfield, Paul J.; Teal, Lorna R.; Travers-trolet, Morgan; De Wolfshaar, Van Karen E.

    2018-01-01

    We review and compare four broad categories of spatially-explicit modelling approaches currently used to understand and project changes in the distribution and productivity of living marine resources including: 1) statistical species distribution models, 2) physiology-based, biophysical models of

  2. Spent Nuclear Fuel (SNF) Project Cask and MCO Helium Purge System Design Review Completion Report - Project A.5 and A.6

    International Nuclear Information System (INIS)

    ARD, K.E.

    2000-01-01

    This report documents the results of the design verification performed on the Cask and Multiple Canister Over-pack (MCO) Helium Purge System. The helium purge system is part of the Spent Nuclear Fuel (SNF) Project Cask Loadout System (CLS) at 100K area. The design verification employed the ''Independent Review Method'' in accordance with Administrative Procedure (AP) EN-6-027-01

  3. What Is Our Current Understanding of One-to-One Computer Projects: A Systematic Narrative Research Review

    Science.gov (United States)

    Fleischer, Hakan

    2012-01-01

    The aim of this article is to review cross-disciplinary accumulated empirical research on one-to-one computer projects in school settings as published in peer-reviewed journals between 2005 and 2010, particularly the results of teacher- and pupil-oriented studies. Six hundred and five research articles were screened at the abstract and title…

  4. 43 CFR 404.51 - Are proposed projects under the Rural Water Supply Program reviewed by the Administration?

    Science.gov (United States)

    2010-10-01

    ... Water Supply Program reviewed by the Administration? 404.51 Section 404.51 Public Lands: Interior... SUPPLY PROGRAM Feasibility Studies § 404.51 Are proposed projects under the Rural Water Supply Program... the Reclamation's Rural Water Supply Program. This includes review under Executive Order 12322 to...

  5. Hawaii Energy Strategy Project 2: Fossil Energy Review. Task IV. Scenario development and analysis

    Energy Technology Data Exchange (ETDEWEB)

    Yamaguchi, N.D.; Breazeale, K. [ed.

    1993-12-01

    The Hawaii Energy Strategy (HES) Program is a seven-project effort led by the State of Hawaii Department of Business, Economic Development & Tourism (DBEDT) to investigate a wide spectrum of Hawaii energy issues. The East-West Center`s Program on Resources: Energy and Minerals, has been assigned HES Project 2, Fossil Energy Review, which focuses on fossil energy use in Hawaii and the greater regional and global markets. HES Project 2 has four parts: Task I (World and Regional Fossil Energy Dynamics) covers petroleum, natural gas, and coal in global and regional contexts, along with a discussion of energy and the environment. Task II (Fossil Energy in Hawaii) focuses more closely on fossil energy use in Hawaii: current utilization and trends, the structure of imports, possible future sources of supply, fuel substitutability, and energy security. Task III`s emphasis is Greenfield Options; that is, fossil energy sources not yet used in Hawaii. This task is divided into two sections: first, an in-depth {open_quotes}Assessment of Coal Technology Options and Implications for the State of Hawaii,{close_quotes} along with a spreadsheet analysis model, which was subcontracted to the Environmental Assessment and Information Sciences Division of Argonne National Laboratory; and second, a chapter on liquefied natural gas (LNG) in the Asia-Pacific market and the issues surrounding possible introduction of LNG into the Hawaii market.

  6. The Society for Implementation Research Collaboration Instrument Review Project: a methodology to promote rigorous evaluation.

    Science.gov (United States)

    Lewis, Cara C; Stanick, Cameo F; Martinez, Ruben G; Weiner, Bryan J; Kim, Mimi; Barwick, Melanie; Comtois, Katherine A

    2015-01-08

    Identification of psychometrically strong instruments for the field of implementation science is a high priority underscored in a recent National Institutes of Health working meeting (October 2013). Existing instrument reviews are limited in scope, methods, and findings. The Society for Implementation Research Collaboration Instrument Review Project's objectives address these limitations by identifying and applying a unique methodology to conduct a systematic and comprehensive review of quantitative instruments assessing constructs delineated in two of the field's most widely used frameworks, adopt a systematic search process (using standard search strings), and engage an international team of experts to assess the full range of psychometric criteria (reliability, construct and criterion validity). Although this work focuses on implementation of psychosocial interventions in mental health and health-care settings, the methodology and results will likely be useful across a broad spectrum of settings. This effort has culminated in a centralized online open-access repository of instruments depicting graphical head-to-head comparisons of their psychometric properties. This article describes the methodology and preliminary outcomes. The seven stages of the review, synthesis, and evaluation methodology include (1) setting the scope for the review, (2) identifying frameworks to organize and complete the review, (3) generating a search protocol for the literature review of constructs, (4) literature review of specific instruments, (5) development of an evidence-based assessment rating criteria, (6) data extraction and rating instrument quality by a task force of implementation experts to inform knowledge synthesis, and (7) the creation of a website repository. To date, this multi-faceted and collaborative search and synthesis methodology has identified over 420 instruments related to 34 constructs (total 48 including subconstructs) that are relevant to implementation

  7. Is Project Towards No Drug Abuse (Project TND) an evidence-based drug and violence prevention program? A review and reappraisal of the evaluation studies.

    Science.gov (United States)

    Gorman, Dennis M

    2014-08-01

    This paper critically reviews the published evidence pertaining to Project Towards No Drug Abuse (Project TND). Publications from seven evaluation studies of Project TND are reviewed, and the results from these are discussed as related to the following outcomes: main effects on the use of cigarettes, alcohol and marijuana; main effects on the use of "hard drugs," defined in the evaluations as cocaine, hallucinogens, stimulants, inhalants, ecstasy and other drugs (e.g., depressants, PCP, steroids and heroin); subgroup and interaction analyses of drug use; and violence-related behaviors. Very few main effects have been found for cigarette, alcohol and marijuana use in the Project TND evaluations. While studies do report main effects for hard drug use, these findings are subject to numerous threats to validity and may be attributable to the data analyses employed. Similarly, while isolated subgroup and interaction effects were found for alcohol use among baseline nonusers and some violence-related behaviors in the early Project TND evaluations, these findings have not been replicated in more recent studies and may result from multiple comparisons between study conditions. In conclusion, there is little evidence to support the assertion that Project TND is an effective drug or violence prevention program. The broader implications of these findings for prevention science are discussed and suggestions are made as to how the quality of research in the field might be improved.

  8. Taking stock of project value creation: A structured literature review with future directions for research and practice

    DEFF Research Database (Denmark)

    Laursen, Markus; Svejvig, Per

    2016-01-01

    This paper aims to take stock of what we know about project value creation and to present future directions for research and practice. We performed an explorative and unstructured literature review, which was subsequently paired with a structured literature review. We join several research areas...... by adopting the project value creation perspective on literature relating to benefits, value, performance, and success in projects. Our review includes 111 contributions analyzed through both an inductive and deductive approach. We find that relevant literature dates back to the early 1980s, and the still...... developing value-centric view has been the subject of many publications in recent years. We contribute to research on project value creation through four directions for future research: rejuvenating value management through combining value, benefits, and costs; supplementing value creation with value capture...

  9. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    International Nuclear Information System (INIS)

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations

  10. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations.

  11. Managing multiple projects: a literature review of setting priorities and a pilot survey of healthcare researchers in an academic setting.

    Science.gov (United States)

    Hopkins, Robert Borden; Campbell, Kaitryn; O'Reilly, Daria; Tarride, Jean-Eric; Bowen, Jim; Blackhouse, Gord; Goerre, Ron

    2007-05-16

    To summarize and then assess with a pilot study the use of published best practice recommendations for priority setting during management of multiple healthcare research projects, in a resource-constrained environment. Medical, economic, business, and operations literature was reviewed to summarize and develop a survey to assess best practices for managing multiple projects. Fifteen senior healthcare research project managers, directors, and faculty at an urban academic institution were surveyed to determine most commonly used priority rules, ranking of rules, characteristics of their projects, and availability of resources. Survey results were compared to literature recommendations to determine use of best practices. Seven priority-setting rules were identified for managing multiple projects. Recommendations on assigning priorities by project characteristics are presented. In the pilot study, a large majority of survey respondents follow best practice recommendations identified in the research literature. However, priority rules such as Most Total Successors (MTS) and Resource Scheduling Method (RSM) were used "very often" by half of the respondents when better performing priority rules were available. Through experience, project managers learn to manage multiple projects under resource constraints. Best practice literature can assist project managers in priority setting by recommending the most appropriate priority given resource constraints and project characteristics. There is room for improvement in managing multiple projects.

  12. Visualizing Article Similarities via Sparsified Article Network and Map Projection for Systematic Reviews.

    Science.gov (United States)

    Ji, Xiaonan; Machiraju, Raghu; Ritter, Alan; Yen, Po-Yin

    2017-01-01

    Systematic Reviews (SRs) of biomedical literature summarize evidence from high-quality studies to inform clinical decisions, but are time and labor intensive due to the large number of article collections. Article similarities established from textual features have been shown to assist in the identification of relevant articles, thus facilitating the article screening process efficiently. In this study, we visualized article similarities to extend its utilization in practical settings for SR researchers, aiming to promote human comprehension of article distributions and hidden patterns. To prompt an effective visualization in an interpretable, intuitive, and scalable way, we implemented a graph-based network visualization with three network sparsification approaches and a distance-based map projection via dimensionality reduction. We evaluated and compared three network sparsification approaches and the visualization types (article network vs. article map). We demonstrated the effectiveness in revealing article distribution and exhibiting clustering patterns of relevant articles with practical meanings for SRs.

  13. Projecting hydropower production under future climates: a review of modelling challenges and open questions

    Science.gov (United States)

    Schaefli, Bettina

    2015-04-01

    Hydropower is a pillar for renewable electricity production in almost all world regions. The planning horizon of major hydropower infrastructure projects stretches over several decades and consideration of evolving climatic conditions plays an ever increasing role. This review of model-based climate change impact assessments provides a synthesis of the wealth of underlying modelling assumptions, highlights the importance of local factors and attempts to identify the most urgent open questions. Based on existing case studies, it critically discusses whether current hydro-climatic modelling frameworks are likely to provide narrow enough water scenario ranges to be included into economic analyses for end-to-end climate change impact assessments including electricity market models. This will be completed with an overview of not or indirectly climate-related boundary conditions, such as economic growth, legal constraints, national subsidy frameworks or growing competition for water, which might locally largely outweigh any climate change impacts.

  14. Using Model-Based Systems Engineering To Provide Artifacts for NASA Project Life-Cycle and Technical Reviews

    Science.gov (United States)

    Parrott, Edith L.; Weiland, Karen J.

    2017-01-01

    The ability of systems engineers to use model-based systems engineering (MBSE) to generate self-consistent, up-to-date systems engineering products for project life-cycle and technical reviews is an important aspect for the continued and accelerated acceptance of MBSE. Currently, many review products are generated using labor-intensive, error-prone approaches based on documents, spreadsheets, and chart sets; a promised benefit of MBSE is that users will experience reductions in inconsistencies and errors. This work examines features of SysML that can be used to generate systems engineering products. Model elements, relationships, tables, and diagrams are identified for a large number of the typical systems engineering artifacts. A SysML system model can contain and generate most systems engineering products to a significant extent and this paper provides a guide on how to use MBSE to generate products for project life-cycle and technical reviews. The use of MBSE can reduce the schedule impact usually experienced for review preparation, as in many cases the review products can be auto-generated directly from the system model. These approaches are useful to systems engineers, project managers, review board members, and other key project stakeholders.

  15. SKB's Project SAFE for the SFR 1 Repository. A Review by Consultants to SKI

    International Nuclear Information System (INIS)

    Chapman, N.A.; Maul, P.R.; Robinson, P.C.; Savage, D.

    2002-06-01

    The SFR 1 repository used for final disposal of low- and intermediate level radioactive waste produced by the Swedish nuclear power programme, industry, medicine and research. In 1992 it was granted a full-scale operating permit following additional reporting on long-term safety aspects by SKB, including the first in-depth safety assessment in 1991. It was stipulated as part of the full-scale licence for SFR 1 that a revised safety assessment should be carried out by SKB at least every ten years during the continued operation of the facility. The first 10-year SKB re-evaluation, called 'Project SAFE', was submitted to the regulators in 2001. The review of Project SAFE presented in this report is the culmination of several years' work with SKI including: 1. The extension and application of SKI's 'systems' approach to set up a description of the SFR 1 repository using Process Influence Diagrams (PIDs). 2. Participation in the development of a flexible Performance Assessment (PA) software tool (the AMBER code) that enables time-dependent analyses to be made of system behaviour. 3. Use of the PID database to explore, from first principles, issues that are likely to be important in the safety performance of SFR 1 and thereby to identify topics to be explored by PA modelling. 4. Peer review of the main SKB Project SAFE supporting documentation to evaluate quality, completeness and the implications of the results. 5. An independent PA exercise, using the AMBER code. 6. A review of an English translation of Section 5 of SKB's Project SAFE Final Safety Report. The present report covers only items 3 to 6, and a separate report provides a more detailed description of item 5. As a result of this review, the key issues that the regulatory authorities will need to address when reviewing SKB's safety case for SFR 1 have been identified as: 1. There is no clear statement of SKB's overall safety concept for SFR 1. It is therefore difficult to judge the results of the PA against

  16. A review of Environmental Impact Assessment parameters required for set up of a hydropower project

    International Nuclear Information System (INIS)

    Roy, Pankaj Kumar; Mazumdar, Asis

    2013-01-01

    Environmental Impact Assessment in general, hydro-meteorological conditions, topography, hydrology, water availability analysis of a river system, importance of hydropower and feasibility study of Environmental Impact assessment due to the construction of the hydropower plant have been discussed in this research work. The site selection is one of the major components so far the hydropower is concerned and also the minimum flow should have known to us so that the capacity of a hydropower plant can be predicted. The sustainable flow, which refers the flow is available throughout the year, has been calculated based on flow duration curve. This study highlights the environmental impact assessment particularly related to hydropower project. Here the study area a district town located in the eastern region of India on the banks of river Kosi has been considered. The historical rainfall and the river discharge data have been collected from various organizations. The stage-discharge correlation and hydrological parameters related to hydropower have been analyzed and also to discuss the review of environmental impact assessment in hydropower project. The EIA analysis can be also carried out by using fuzzy logic wherein the EIA parameters can be given different weight-age based on the various survey reports that have been carried out at different places at different time. Such analysis has also been provided below based on the various data obtained.

  17. A review of the design, construction and development of the PUSPATI project

    International Nuclear Information System (INIS)

    Ahmad Tajuddin Ali.

    1983-01-01

    The setting up of the Tun Ismail Atomic Research Centre (PUSPATI) was decided upon in September 1972 and soon after, plans were underway for the purchase of a research reactor and the construction of a research centre to house it. The centre was originally planned to be located at Sungai Buloh about 20 km to the north-west of Kuala Lumpur. However, in September 1978, a decision was made to locate the centre at Bangi, about 32 km to south of Kuala Lumpur. Earth work was started in January 1979 with clearing of the forest at the proposed site. Building construction started in February 1980. By September 1981, the reactor building was practically completed and enable reactor construction to begin. This was finished on July 15, 1982 when the reactor was officially handed over to PUSPATI. Work on the rest of the complex fell behind schedule and was only completed in July 1983 when PUSPATI moved in to occupy the research laboratories. The implementation of the PUSPATI project has been completed not without its share of problems. Its completion also marks the beginning of a new era for the development of nuclear science and technology in this country. This paper reviews the design, construction and development of the entire project. (author)

  18. Child injuries in Ethiopia: A review of the current situation with projections.

    Science.gov (United States)

    Li, Qingfeng; Alonge, Olakunle; Lawhorn, Collene; Ambaw, Yirga; Kumar, Smita; Jacobs, Troy; Hyder, Adnan A

    2018-01-01

    Heavy burden of child injuries and lack of policy response in Ethiopia call for an improved understanding of the situation and development of action plans from multiple governmental agencies and stakeholders. A consortium of international and Ethiopian researchers and stakeholders used extensive literature review and mixed analytical methods to estimate and project the burden of fatal and non-fatal child unintentional injuries in Ethiopia from 2015 to 2030. Estimates were derived for children aged 0-14 years. Data sources include a longitudinal study conducted by the Central Statistics Agency of Ethiopia and the World Bank as well as model-based estimates from World Health Organization 2017 and Global Burden of Disease 2016 project. Injuries caused about 25 thousand deaths among 0-14-year olds in Ethiopia in 2015. The leading cause of fatal child unintentional injuries in Ethiopia was road-traffic injuries, followed by fire, heat and hot substances and drowning. The death rate due to injuries among 0-14 years olds was about 50 percent higher in males than females. Rural children were exposed to a greater risk of injury than their urban peers. The longitudinal survey suggests that the incidence rate of child injuries increased during the period 2011-2014. The annual mortality caused by injuries is projected to increase from 10,697 in 2015 to 11,279 in 2020 and 11,989 in 2030 among children under 5 years, an increase of 12 percentage points in 15 years. The number of deaths among 0-14-year olds will be 26,463, 27,807, and 30,364 respectively in 2015, 2020, and 2030. As the first multisectoral collaboration on child injuries in Ethiopia, this study identified gaps in understanding of the burden of child injuries in Ethiopia. In consultation with Ethiopian government and other stakeholders, we propose starting an injury surveillance system at health clinics and hospitals and building an intervention package based on existing platforms.

  19. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 87

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    Approximately 30 research projects are summarized in this report. Title of the project, contract number, company or university, award amount, principal investigators, objectives, and summary of technical progress are given for each project. Enhanced oil recovery projects include chemical flooding, gas displacement, and thermal recovery. Most of the research projects though are related to geoscience technology and reservoir characterization.

  20. Tri-State Synfuels Project Review: Volume 12. Fluor project status. [Proposed Henderson, Kentucky coal to gasoline plant; engineering

    Energy Technology Data Exchange (ETDEWEB)

    1982-06-01

    The purpose of this report is to document and summarize activities associated with Fluor's efforts on the Tri-State Synfuels Project. The proposed facility was to be coal-to-transport fuels facility located in Henderson, Kentucky. Tri-State Synfuels Company was participating in the project as a partner of the US Department of Energy per terms of a Cooperative Agreement resulting from DOE's synfuel's program solicitation. Fluor's initial work plan called for preliminary engineering and procurement services to the point of commitment for construction for a Sasol Fischer-Tropsch plant. Work proceeded as planned until October 1981 when results of alternative coal-to-methanol studies revealed the economic disadvantage of the Synthol design for US markets. A number of alternative process studies followed to determine the best process configuration. In January 1982 Tri-State officially announced a change from Synthol to a Methanol to Gasoline (MTG) design basis. Further evaluation and cost estimates for the MTG facility eventually led to the conclusion that, given the depressed economic outlook for alternative fuels development, the project should be terminated. Official announcement of cancellation was made on April 13, 1982. At the time of project cancellation, Fluor had completed significant portions of the preliminary engineering effort. Included in this report are descriptions and summaries of Fluor's work during this project. In addition location of key project data and materials is identified and status reports for each operation are presented.

  1. Information and Communications Technologies Health Projects in Panama: A Systematic Review and their Relation with Public Policies.

    Science.gov (United States)

    Sánchez, Gema Anabel Castillo; Berbey, Aranzazu; de la Torre-Díez, Isabel; López-Coronado, Miguel

    2017-07-01

    This paper presents a review about Information and Communications Technologies (ICTs) health projects in Panama. The main contribution is to provide a vision of the situation in Panama, allowing an understanding of the dynamics of health policies and how they have affected the implementation of ICT's Projects to improve the health of Panamanians. We analyze the projects found with ICT's in health of Panama, which allow us to see a perspective of projects information is obtained from 2000 to 2016, however it is important to highlight that there may be other projects that we do not know because we did not find enough information or evidence of the same. That is why this review has interviews with key personnel, who have guided us with the search for information. 56% of technology projects are concentrated in the capital city and only 16% in the province of Chiriquí. 64% of these projects are focused on the development of information systems, mainly focused on electronic patient registration. And 60% refers to projects related to primary health care. The MINSA and CSS both with a 20% participation in ICT project, in addition we can notice the dispersion of projects for hospitals, where each one is developing programs per their needs or priorities. The national information about ICT projects of Health, it has been notorious the state of dispersion and segmented of public health information. We consider that it is a natural consequence of Policy in Panamanian Health System. This situation limits the information retrieval and knowledge of ICT in Health of Panama. To stakeholders, this information is directed so that health policies are designed towards a more effective and integral management, administering the ICT's as tools for the well-being of most the Panamanian population, including indigenous group.

  2. Design review report: AN valve pit upgrades for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's AN Valve Pit Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314, Tank Farm Restoration and Safe Operations, is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farms' waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first package to be performed is the AN Valve Pit Upgrades package. The scope of the modifications includes new pit cover blocks, valve manifolds, leak detectors, transfer line connections (for future planned transfer lines), and special protective coating for the 241-AN-A and 241-AN-B valve pits

  3. Making Infrastructure Work for Women and Men : A Review of World Bank Infrastructure Projects (1995-2009)

    OpenAIRE

    World Bank

    2010-01-01

    This report provides a gender review of a decade and a half of World Bank infrastructure lending for 1,246 projects. The objective of this review is to assess the status of and trends in gender integration in the World Bank infrastructure portfolio, and to establish a baseline for monitoring and enhancing gender integration in line with commitments made for the 2006 gender action plan. The ...

  4. Compilation of reports of the Advisory Committee on Reactor Safeguards, 1957-1984. Volume 3. Project Reviews Q-Z

    International Nuclear Information System (INIS)

    1985-04-01

    This six-volume compilation contains over 1000 reports prepared by the Advisory Committee on Reactor Safeguards from September 1957 through December 1984. The reports are divided into two groups: Part 1: ACRS Resports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and within project name by chronological order. Part 2 categorizes the reports by the most appropriate generic subject area and within subject area by chronological order. This volume includes reports arranged alpbabetically from Q to Z

  5. An international peer review of the biosphere modelling programme of the US Department of Energy's Yucca mountain site characterization project. Report of the IAEA International Review Team

    International Nuclear Information System (INIS)

    2001-04-01

    The United States Department of Energy (DOE) has a project for characterizing the site of a facility for disposing of radioactive waste located at Yucca Mountain Nevada, USA (the Yucca Mountain Site Characterization Project). This Project has developed an approach for assessing the future potential impact of any releases of radionuclides to the biosphere from a potential disposal facility sited at Yucca Mountain The DOE requested the International Atomic Energy Agency (IAEA) to organize an independent international expert review of the assessment methodology being used in its biosphere modelling programme. The IAEA accepted the request in the context of its statutory obligation to provide for the application of its established international standards of safety for the protection of health, at the request of a State, to any of that State's activities in the field of atomic energy. The terms of reference of the peer review were to review the biosphere assessment methodology being used for the total system performance assessment of the potential disposal facility. The main purpose was to analyze critically the proposed rationale and methodology and to identify consistencies and inconsistencies between methods being used in the frame of the Project and those established in international standards or in international programmes such as the IAEA's Biosphere Modelling and Assessment Programme (BIOMASS). This report presents the consensus view of the international experts convened by the IAEA for carrying out the review

  6. Speculative resources of uranium. A review of International Uranium Resources Evaluation Project (IUREP) estimates 1982-1983

    International Nuclear Information System (INIS)

    1983-01-01

    On a country by country basis the International Uranium Resources Evaluation Project (IUREP) estimates 1982-1983 are reviewed. Information provided includes exploration work, airborne survey, radiometric survey, gamma-ray spectrometric survey, estimate of speculative resources, uranium occurrences, uranium deposits, uranium mineralization, agreements for uranium exploration, feasibilities studies, geological classification of resources, proposed revised resource range, production estimate of uranium

  7. Investigating the Quality of Project-Based Science and Technology Learning Environments in Elementary School: A Critical Review of Instruments

    Science.gov (United States)

    Thys, Miranda; Verschaffel, Lieven; Van Dooren, Wim; Laevers, Ferre

    2016-01-01

    This paper provides a systematic review of instruments that have the potential to measure the quality of project-based science and technology (S&T) learning environments in elementary school. To this end, a comprehensive literature search was undertaken for the large field of S&T learning environments. We conducted a horizontal bottom-up…

  8. 42 CFR 137.365 - What is the procedure for the Secretary's review and approval of project planning and design...

    Science.gov (United States)

    2010-10-01

    ... SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the...-Governance Tribe? (a) The Secretary shall review and approve planning documents to ensure compliance with... design documents for general compliance with requirements of the construction project agreement. (b) The...

  9. DOE responses to Ecology review comments for ''Sampling and analysis plans for the 100-D Ponds voluntary remediation project''

    International Nuclear Information System (INIS)

    1996-01-01

    The Sampling and Analysis Plan describes the sampling and analytical activities which will be performed to support closure of the 100-D Ponds at the Hanford Reservation. This report contains responses by the US Department of Energy to Ecology review for ''Sampling and Analysis Plan for the 100-D Ponds Voluntary Remediation Project.''

  10. Off-site radiation exposure review project: computer-aided surface interpolation and graphical display

    International Nuclear Information System (INIS)

    Foley, T.A. Jr.

    1981-08-01

    This report presents the implementation of an iterative procedure that solves the following bivariate interpolation problem: Given N distinct points in the plane (x/sub i/, y/sub i/) and N real numbers Z/sub i/, construct a function F(x,y) that satisfies F(x/sub i/, y/sub i/) = Z/sub i/, for i = 1, ..., N. This problem can be interpreted as fitting a surface through N points in three dimensional space. The application of primary concern to the Offsite Radiation Exposure Review Project is the characterization of the radionuclide activity resulting from nuclear tests. Samples of activity were measured at various locations. The location of the sample point is represented by (x/sub i/, y/sub i/), and the magnitude of the reading is represented by Z/sub i/. The method presented in this report is constructed to be efficient on large data sets, stable on the large variations of the Z/sub i/ magnitudes, and capable of smoothly filling in areas that are void of data. This globally defined icode was initiateminednitial shock but to two later eriological invaders are Staphylococcus albus, Beta-hemolytic Streptococcus e to the same general semiclassical treatment

  11. Experiences in the TC IAEA MEX4/058 project: RCIC Ageing Management Review

    International Nuclear Information System (INIS)

    Diaz, A.; Mendoza, G.; Viais, J.; Arganis, C.; Contreras, A.; Fernandez, G.; Medina, G.

    2012-01-01

    The present paper, describes the experiences in the Technical Cooperation Project with the IAEA MEX 4/058 related with the Licensed Renewal Process, according with 10 CFR 54, NEI-95-10, NUREG 1800 and NUREG 1801. A domestic data base using Microsoft ACCESS was made following the methodology suggest by 10 CFR 54, and the Reactor Core Isolation Cooling (RCIC) System was selected like a pilot system. The mechanical components within the scope of license renewal and their intended functions were selected and the components subject to Aging Management Review (AMR) were identified. Commodities groups of similar material, environment and intended function were used and the main Ageing Mechanisms were identified. The results were compared with the NUREG 1801 rev. 2 experiences and the possible AMP was addressed. In the case of Laguna Verde Nuclear Power Plant (LVNPP) U1, some of these programs are according with the Generic Aging Lesson Learned of NUREG 1801, while others AMP require modifications. It is important to mention that the application of this methodology will support activities related with long term operation in LVNPP. (author)

  12. Marketing Industrial Project-Related Services: A Literature Review and Theoretical Synthesis

    DEFF Research Database (Denmark)

    Skaates, Maria Anne; Cova, Bernard

    2002-01-01

    Services are a growing part of projects in the context of the international trend towards solution buying and selling on business-to-business markets. Furthermore services are often a key source of competitive advantage in project business. However companies selling project-related services often...... that specifically deal with project-related services are listed as the result of a study of the English-, French-, German, Italian-, and 'Nordic'-language academic literature. They are then assessed in relation to services versus project marketing theory. The analysis shows that the project marketing concepts...

  13. Report of the International Review Committee of the joint proposal of the Japan Hadron Facility (KEK) and the Neutron Science Project (JAERI)

    International Nuclear Information System (INIS)

    1999-08-01

    The International Review Committee composed of twelve Japanese and foreign experts was set up under the Research Evaluation Committee of JAERI, and has reviewed the proposed joint project combining JAERI's Neutron Science Project and KEK's Japan Hadron Facility into one major facility. The review meeting took place on April 26-27, 1999, at JAERI Head quarters, Tokyo. According to the points of review given in advance, the review was implemented based on the joint project report submitted and presentations of both institutions. The Research Evaluation Committee received the review report and its explanations from the Review Committee on July 5. The Research Evaluation Committee has acknowledged appropriateness of the review results. This report describes the review results. (author)

  14. Cost Control and Performance Review of Software Projects by Using the Earned Value Management

    Directory of Open Access Journals (Sweden)

    Felician ALECU

    2014-08-01

    Full Text Available EVM (Earned Value Management is a method that can be successfully used to measure the performance of a project from the cost and schedule points of view. Initially developed for the US government programs in the 60s, it later becomes an important feature of any modern project management practice thanks to its simplicity and efficiency in signaling project anomalies in time. EVM become extremely popular because it can be equally applied for any project in any industry.

  15. 78 FR 53436 - Improving Performance of Federal Permitting and Review of Infrastructure Projects

    Science.gov (United States)

    2013-08-29

    ... projects, and by implementing best-management practices. These best-management practices include... role of the Project Proponent at this stage is to gather initial information to be included in the... Projects AGENCY: Office of Electricity Delivery and Energy Reliability, Department of Energy. ACTION...

  16. Ethical Review of Undergraduate Student Research Projects: A Proportionate, Transparent and Efficient Process?

    Science.gov (United States)

    Hack, Catherine J.

    2012-01-01

    Undergraduate research projects in the life sciences encompass a broad range of studies, some of which may require the participation of human subjects or other activities which may raise ethical concerns. As universities are accountable for all projects undertaken under their auspices they must ensure that these projects adhere to legal…

  17. 36 CFR 1010.14 - Review of proposals by project applicants.

    Science.gov (United States)

    2010-07-01

    ...) With respect to each project proposed for consideration for which the NEPA Compliance Coordinator... the scope and content of the final EA. (e) With respect to each project proposed for consideration for... Trust and who certify that they have no financial or other interest in the outcome of the project, and...

  18. Comprehensive review of an accelerated nursing program: a quality improvement project.

    Science.gov (United States)

    Nugent, Elinor; LaRocco, Susan

    2014-01-01

    Accelerated second-degree programs are designed to provide entry into baccalaureate nursing program for people who have achieved bachelor's degree in another field. These programs were often designed to respond to nursing shortages at local and national levels. Programs commonly use a cohort model and move students through an intensive structure combining classroom and clinical requirement with a 2-year period. The accelerated second-degree nursing program, Accelerated Entry Level to Nursing program at our small liberal arts college, was considered to be successful. The program had excellent graduation rates and National Council Licensure Examination for Registered Nurses pass rates, indicating that the program was preparing the graduate to thrive in the practice setting. The program had been in existence for more than 7 years, with highly competitive admissions and high student satisfaction. The objective of this study was to provide a quality improvement assessment process to capture quantitative and qualitative information about the graduates. This information would be used to inform our own nursing education department and would provide metrics and information for nurse leaders regarding the rigor of these programs and the potential of graduates. Continuous quality improvement is a vital component in nursing education as well as in the clinical setting. With this in mind, a comprehensive review was undertaken by the nursing faculty during the eighth year of the highly successful accelerated nursing program in a small liberal arts college. This quality improvement project was designed to review existing metrics and to collect additional data through survey and focus groups in order to capture experiences of the program graduates. Graduates of the accelerated program from 2005 to 2011 were included in this study. Faculty who teach in the program participated in focus groups. From 2005 to 2011, there have been a total of 196 graduates in 8 cohorts; 194 surveys

  19. Factors influencing the development of primary care data collection projects from electronic health records: a systematic review of the literature.

    Science.gov (United States)

    Gentil, Marie-Line; Cuggia, Marc; Fiquet, Laure; Hagenbourger, Camille; Le Berre, Thomas; Banâtre, Agnès; Renault, Eric; Bouzille, Guillaume; Chapron, Anthony

    2017-09-25

    Primary care data gathered from Electronic Health Records are of the utmost interest considering the essential role of general practitioners (GPs) as coordinators of patient care. These data represent the synthesis of the patient history and also give a comprehensive picture of the population health status. Nevertheless, discrepancies between countries exist concerning routine data collection projects. Therefore, we wanted to identify elements that influence the development and durability of such projects. A systematic review was conducted using the PubMed database to identify worldwide current primary care data collection projects. The gray literature was also searched via official project websites and their contact person was emailed to obtain information on the project managers. Data were retrieved from the included studies using a standardized form, screening four aspects: projects features, technological infrastructure, GPs' roles, data collection network organization. The literature search allowed identifying 36 routine data collection networks, mostly in English-speaking countries: CPRD and THIN in the United Kingdom, the Veterans Health Administration project in the United States, EMRALD and CPCSSN in Canada. These projects had in common the use of technical facilities that range from extraction tools to comprehensive computing platforms. Moreover, GPs initiated the extraction process and benefited from incentives for their participation. Finally, analysis of the literature data highlighted that governmental services, academic institutions, including departments of general practice, and software companies, are pivotal for the promotion and durability of primary care data collection projects. Solid technical facilities and strong academic and governmental support are required for promoting and supporting long-term and wide-range primary care data collection projects.

  20. Production of wood derived fuels. Review of research projects; Puupolttoaineiden tuotantotekniikka. Tutkimusalueen katsaus

    Energy Technology Data Exchange (ETDEWEB)

    Korpilahti, A [Metsaeteho Oy, Helsinki (Finland)

    1997-12-01

    The research and development work was very active on the area of wood derived fuels during the past year 1996. Totally some 40 projects were going on, and till the end of the year about 15 projects were completed. The projects broadly covered the research area focusing from material flows, productivity studies, basic wood properties to several case studies. When new production methods and machinery was introduced earlier by demonstration projects, now they were investigated by follow up projects. The economical and quality results of logging residue harvesting and comminution seem quite satisfactory, but integrated methods and production chains still need research and development. (orig.)

  1. Assessing community-based conservation projects: A systematic review and multilevel analysis of attitudinal, behavioral, ecological, and economic outcomes

    Directory of Open Access Journals (Sweden)

    Brooks Jeremy

    2013-01-01

    Full Text Available Abstract Background Community-based conservation (CBC promotes the idea that long-term conservation success requires engaging with, and providing benefits for local communities. Though widespread, CBC projects are not always successful or free of controversy. With criticisms on all sides of the conservation debates, it is critical to have a better understanding of (1 whether CBC is an effective conservation tool, and (2 of the factors associated with the success or failure of CBC projects, and the scale at which these factors operate. Recent CBC reviews have typically examined only a single resource domain, have limited geographic scope, consider only one outcome, or ignore the nested nature of socioecological systems. To remedy these issues, we use a newly coded global comparative database of CBC projects identified by systematic review to evaluate success in four outcome domains (attitudes, behaviors, ecological, economic and explore synergies and tradeoffs among these outcomes. We test hypotheses about how features of the national context (H-NC, project design (H-PD, and local community characteristics (H-CC affect these four measures of success. Methods To add to a sample of 62 projects that we used from previous systematic reviews, we systematically searched the conservation literature using six terms in four online databases. To increase the number of projects for each country in order to conduct a multilevel analysis, we also conducted a secondary search using the Advancing Conservation in a Social Context online library. We coded projects for 65 pieces of information. We conducted bivariate analyses using two-dimensional contingency tables and proportional odds logistic regression and conducted multivariate analyses by fitting reduced form proportional odds logistic regression models that were selected using a forward stepwise AIC approach. Results The primary and secondary searches produced 74 new projects to go along with the 62

  2. Use of targeted medication reviews to deliver preconception care: A demonstration project.

    Science.gov (United States)

    DiPietro Mager, Natalie A; Bright, David R; Markus, Dani; Weis, Lindsey; Hartzell, David M; Gartner, James

    To demonstrate the ability of a statewide network of community pharmacists to provide preconception care services with the use of targeted medication reviews (TMRs). Community pharmacists are well qualified and well positioned to assist in this public health priority; however, there are no documented case studies of pharmacists providing preconception care with the use of TMRs. Through the demonstration project, pharmacists provided educational TMRs focused on 3 elements of preconception care to women aged 15 to 45 years enrolled in a nonprofit managed care plan: (1) medications that may cause fetal harm (category D/X); (2) folic acid use; and (3) immunizations. TMRs were generated and released to the individual pharmacy where that patient had prescriptions filled. Any practicing pharmacist in Ohio participating in the medication therapy management platform with a patient in the sample received a TMR notification. The pharmacists documented and billed for the service through this commercially available platform. Nineteen weeks after implementation of the TMRs, 1149 individual pharmacists from 818 different pharmacies had completed at least 1 TMR. Pharmacists completed 33% of all TMR opportunities with a 65% success rate. Establishing new services that were focused on preconception care resulted in rapid integration into existing medication therapy management processes in hundreds of pharmacies across Ohio. These results may help to provide justification for additional payers to reimburse for similar services. Through demonstrating the impact on preconception care, the role of the community pharmacist may continue to expand to include provision of additional preventive care services following the model developed in this initiative. Copyright © 2017 American Pharmacists Association®. Published by Elsevier Inc. All rights reserved.

  3. Review of project definition studies of possible on-site uses of superconducting super collider assets and facilities. Final report

    International Nuclear Information System (INIS)

    1994-12-01

    This document reports on the results of a peer review and evaluation of studies made of potential uses of assets from the terminated Superconducting Super Collider (SSC) project. These project definition studies focused on nine areas of use of major assets and facilities at the SSC site near Waxahachie, Texas. The studies were undertaken as part of the effort to maximize the value of the investment made in the SSC and were supported by two sets of grants, one to the Texas National Research Laboratory Commission (TNRLC) and the second to various universities and other institutions for studies of ideas raised by a public call for expressions of interest. The Settlement Agreement, recently signed by the Department of Energy (DOE) and TNRLC, provides for a division of SSC property. As part of the goal of maximizing the value of the SSC investment, the findings contained in this report are thus addressed to officials in both the Department and TNRLC. In addition, this review had several other goals: to provide constructive feedback to those doing the studies; to judge the benefits and feasibility (including funding prospects) of the projects studied; and to help worthy projects become reality by matching projects with possible funding sources

  4. Review of project definition studies of possible on-site uses of superconducting super collider assets and facilities

    International Nuclear Information System (INIS)

    1994-12-01

    This document reports on the results of a peer review and evaluation of studies made of potential uses of assets from the terminated Superconducting Super Collider (SSC) project. These project definition studies focused on nine areas of use of major assets and facilities at the SSC site near Waxahachie, Texas. The studies were undertaken as part of the effort to maximize the value of the investment made in the SSC and were supported by two sets of grants, one to the Texas National Research Laboratory Commission (TNRLC) and the second to various universities and other institutions for studies of ideas raised by a public call for expressions of interest. The Settlement Agreement, recently signed by the Department of Energy (DOE) and TNRLC, provides for a division of SSC property. As part of the goal of maximizing the value of the SSC investment, the findings contained in this report are thus addressed to officials in both the Department and TNRLC. In addition, this review had several other goals: to provide constructive feedback to those doing the studies; to judge the benefits and feasibility (including funding prospects) of the projects studied; and to help worthy projects become reality by matching projects with possible funding sources

  5. Review of project definition studies of possible on-site uses of superconducting super collider assets and facilities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-01

    This document reports on the results of a peer review and evaluation of studies made of potential uses of assets from the terminated Superconducting Super Collider (SSC) project. These project definition studies focused on nine areas of use of major assets and facilities at the SSC site near Waxahachie, Texas. The studies were undertaken as part of the effort to maximize the value of the investment made in the SSC and were supported by two sets of grants, one to the Texas National Research Laboratory Commission (TNRLC) and the second to various universities and other institutions for studies of ideas raised by a public call for expressions of interest. The Settlement Agreement, recently signed by the Department of Energy (DOE) and TNRLC, provides for a division of SSC property. As part of the goal of maximizing the value of the SSC investment, the findings contained in this report are thus addressed to officials in both the Department and TNRLC. In addition, this review had several other goals: to provide constructive feedback to those doing the studies; to judge the benefits and feasibility (including funding prospects) of the projects studied; and to help worthy projects become reality by matching projects with possible funding sources.

  6. Review of project definition studies of possible on-site uses of superconducting super collider assets and facilities. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-01

    This document reports on the results of a peer review and evaluation of studies made of potential uses of assets from the terminated Superconducting Super Collider (SSC) project. These project definition studies focused on nine areas of use of major assets and facilities at the SSC site near Waxahachie, Texas. The studies were undertaken as part of the effort to maximize the value of the investment made in the SSC and were supported by two sets of grants, one to the Texas National Research Laboratory Commission (TNRLC) and the second to various universities and other institutions for studies of ideas raised by a public call for expressions of interest. The Settlement Agreement, recently signed by the Department of Energy (DOE) and TNRLC, provides for a division of SSC property. As part of the goal of maximizing the value of the SSC investment, the findings contained in this report are thus addressed to officials in both the Department and TNRLC. In addition, this review had several other goals: to provide constructive feedback to those doing the studies; to judge the benefits and feasibility (including funding prospects) of the projects studied; and to help worthy projects become reality by matching projects with possible funding sources.

  7. W-519 Sagebrush Mitigation Project FY-2004 Final Review and Status

    Energy Technology Data Exchange (ETDEWEB)

    Durham, Robin E.; Sackschewsky, Michael R.

    2004-09-30

    This report summarizes activities conducted as mitigation for loss of sagebrush-steppe habitats due to Project W-519, the construction of the infrastructure for the Tank Waste Remediation System Vitrification Plant. The focus of this report is to provide a review and final status of mitigation actions performed through FY2004. Data collected since FY1999 have been included where appropriate. The Mitigation Action Plan (MAP) for Project W-519 prescribed three general actions to be performed as mitigation for the disturbance of approximately 40 ha (100 acres) of mature sagebrush-steppe habitat. These actions included: (1) transplanting approximately 130,000 sagebrush seedlings on the Fitzner-Eberhardt Arid Lands Ecology Reserve (ALE); (2) rectification of the new transmission line corridor via seeding with native grasses and sagebrush; and (3) research on native plant species with a goal of increasing species diversity in future mitigation or restoration actions. Nearly 130,000 Wyoming big sagebrush seedlings where planted on ALE during FY2000 and FY2001. About 39,000 of those seedlings were burned during the 24-Command Fire of June 2000. The surviving and subsequent replanting has resulted in about 91,000 seedlings that were planted across four general areas on ALE. A 50% survival rate at any monitoring period was defined as the performance standard in the MAP for this project. Data collected in 2004 indicate that of the over 5000 monitored plants, 51.1% are still alive, and of those the majority are thriving and blooming. These results support the potential for natural recruitment and the ultimate goal of wildlife habitat replacement. Thus, the basic performance standard for sagebrush survival within the habitat compensation planting has been met. Monitoring activities conducted in 2004 indicate considerable variation in seedling survival depending on the type of plant material, site conditions, and to a lesser extent, treatments performed at the time of planting

  8. W-519 Sagebrush Mitigation Project FY-2004 Final Review and Status

    International Nuclear Information System (INIS)

    Durham, Robin E.; Sackschewsky, Michael R.

    2004-01-01

    This report/SUMmarizes activities conducted as mitigation for loss of sagebrush-steppe habitats due to Project W-519, the construction of the infrastructure for the Tank Waste Remediation System Vitrification Plant. The focus of this report is to provide a review and final status of mitigation actions performed through FY2004. Data collected since FY1999 have been included where appropriate. The Mitigation Action Plan (MAP) for Project W-519 prescribed three general actions to be performed as mitigation for the disturbance of approximately 40 ha (100 acres) of mature sagebrush-steppe habitat. These actions included: (1) transplanting approximately 130,000 sagebrush seedlings on the Fitzner-Eberhardt Arid Lands Ecology Reserve (ALE); (2) rectification of the new transmission line corridor via seeding with native grasses and sagebrush; and (3) research on native plant species with a goal of increasing species diversity in future mitigation or restoration actions. Nearly 130,000 Wyoming big sagebrush seedlings where planted on ALE during FY2000 and FY2001. About 39,000 of those seedlings were burned during the 24-Command Fire of June 2000. The surviving and subsequent replanting has resulted in about 91,000 seedlings that were planted across four general areas on ALE. A 50% survival rate at any monitoring period was defined as the performance standard in the MAP for this project. Data collected in 2004 indicate that of the over 5000 monitored plants, 51.1% are still alive, and of those the majority are thriving and blooming. These results support the potential for natural recruitment and the ultimate goal of wildlife habitat replacement. Thus, the basic performance standard for sagebrush survival within the habitat compensation planting has been met. Monitoring activities conducted in 2004 indicate considerable variation in seedling survival depending on the type of plant material, site conditions, and to a lesser extent, treatments performed at the time of planting

  9. The application of post-project reviews in events management by cultural operators

    OpenAIRE

    Benadict Rajasegaram, Annet

    2016-01-01

    Organisations have evidently shifted towards the projectification of their activities and operations across the world and across industries by which project management is not only limited to construction and engineering projects anymore. The projectification has shed light on the amount of project success and failure in which both have been noted to have a steep difference between each other. Whilst many factors have been discovered to be a trigger of failure or success one emerging subject t...

  10. Review and Update Project Design, Work Plan and Activities for 2009 and Beyond

    International Nuclear Information System (INIS)

    Edward, M.

    2009-01-01

    A multi year ongoing project, previously approved by Board of Governors (BOG) that is implemented according to the already approved objectives/outcomes and time frame. All projects have time frame in line with the stated objectives and work plans, of maximum of five years. If rephasing is necessary due to dealys in implementation, the project duration can be extended by up to one year, maintaining the original objectives/outcomes

  11. REVIEW OF INTERNATIONAL PROJECTS IN А FIELD OF HUMAN MICROBIAL ECOLOGY AND CONSTRUCTION OF PROBIOTICS

    Directory of Open Access Journals (Sweden)

    S. A. Starovoitova

    2013-06-01

    Full Text Available Modern huge and world-wide known projects concerning studying of human microbial ecology and construction of probiotics, particularly: Society for Microbial Ecology and Disease, Probiotics & Health Targeted Initiative of International Science and Technology Center (TI PROBIO ISTC, Human Microbiome Project of National Institutes of Health, MetaHIT Project (Metagenomics of the Human Intestinal Tract of European Commission, Human Metabolome Project of Canadian University of Alberta and some more else were characterized in the article. Brief historical information and reference to official sites of every discussed project were given. Main goals and tasks of every project were described. Short characteristic of discussed projects and also modern accessible results of researches were given. Importance of every examined project for widening scientific knowledge in the field of human microbial ecology and also for improvement and/or for construction of modern effective probiotics on basis of human normal intestinal microflora were paid attention. Close interaction of scientific data received by realization of every discussed project was shown.

  12. A review of the South Texas Project probabilistic safety analysis for accident frequency estimates and containment binning

    International Nuclear Information System (INIS)

    Wheeler, T.A.; Lambright, J.A.; Sype, T.T.; Darby, J.L.; Walsh, B.

    1991-08-01

    The objective of this review is to evaluate the South Texas Project (STP) Probabilistic Safety Analysis (PSA) for the USNRC. The PSA was reviewed for thoroughness of analysis, accuracy in plant modeling, legitimacy of assumptions, and overall quality of the work. The review is limited to the internal event analysis and the fire sequence analysis. This review is not a quantitative evaluation of the adequacy of the PSA. The adequacy of the PSA depends on the intended uses and must be addressed on a case-by-case basis by the licensee and the NRC. This review identifies strengths, weakness, and areas where additional clarification would assist the NRC in evaluating the PSA for specific regulatory purposes. The licensee, Houston Lighting and Power (HL ampersand P), reviewed a draft version of this report prior to its final release to the USNRC. The responses provided by HL ampersand P are provided in detail in appendices to this report, and they are summarized in the main body of the report. All issues raised during the review were adequately addressed by HL ampersand P in the responses. 27 refs., 4 tabs

  13. Response to the independent technical review of the UMTRA Project procedures and practices for well drilling and development

    International Nuclear Information System (INIS)

    1994-07-01

    This report is a response to the findings and recommendations contained in the ITR report. The text of this document summarizes each ITR finding and recommendation, presents the TAC response, and concludes that implementation of many of the recommendations would benefit the UMTRA Project. Implementation of the recommendations represents ongoing improvement to the TAC well installation and development procedures and will result, in lower overall project costs. Appendix B is an implementation plan that groups similar or complementary action items, provides a schedule for implementation, identifies the group or people responsible for the changes, and estimates hours to implement the changes. The four major action items are as follows: (1) ITR Reevaluation, (2) Well Installation SOP Review and Revision, (3) Well Installation Contract Review and Revision, and (4) TAC and DOE Communications Improvement. The hours listed to implement the improvements are intended to be estimates for budgeting and planning purposes for the remainder of this fiscal year and the upcoming fiscal year

  14. Response to the independent technical review of the UMTRA Project procedures and practices for well drilling and development

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This report is a response to the findings and recommendations contained in the ITR report. The text of this document summarizes each ITR finding and recommendation, presents the TAC response, and concludes that implementation of many of the recommendations would benefit the UMTRA Project. Implementation of the recommendations represents ongoing improvement to the TAC well installation and development procedures and will result, in lower overall project costs. Appendix B is an implementation plan that groups similar or complementary action items, provides a schedule for implementation, identifies the group or people responsible for the changes, and estimates hours to implement the changes. The four major action items are as follows: (1) ITR Reevaluation, (2) Well Installation SOP Review and Revision, (3) Well Installation Contract Review and Revision, and (4) TAC and DOE Communications Improvement. The hours listed to implement the improvements are intended to be estimates for budgeting and planning purposes for the remainder of this fiscal year and the upcoming fiscal year.

  15. ALARA Design Review for the Resumption of the Plutonium Finishing Plant (PFP) Cementation Process Project Activities

    CERN Document Server

    Dayley, L

    2000-01-01

    The requirements for the performance of radiological design reviews are codified in 10CFR835, Occupational Radiation Protection. The basic requirements for the performance of ALARA design reviews are presented in the Hanford Site Radiological Control Manual (HSRCM). The HSRCM has established trigger levels requiring radiological reviews of non-routine or complex work activities. These requirements are implemented in site procedures HNF-PRO-1622 and 1623. HNF-PRO-1622 Radiological Design Review Process requires that ''radiological design reviews [be performed] of new facilities and equipment and modifications of existing facilities and equipment''. In addition, HNF-PRO-1623 Radiological Work Planning Process requires a formal ALARA Review for planned activities that are estimated to exceed 1 person-rem total Dose Equivalent (DE). The purpose of this review is to validate that the original design for the PFP Cementation Process ensures that the principles of ALARA (As Low As Reasonably Achievable) were included...

  16. Status Review of Wildlife Mitigation at 14 of 27 Major Hydroelectric Projects in Idaho, 1983-1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Martin, Robert C.; Mehrhoff, L.A.

    1985-01-01

    The Pacific Northwest Electric Power Planning and Conservation Act and wildlife and their habitats in the Columbia River Basin and to compliance with the Program, the wildlife mitigation status reports coordination with resource agencies and Indian Tribes. developed the Columbia River Basin Fish and Wildlife Program development, operation, and maintenance of hydroelectric projects on existing agreements; and past, current, and proposed wildlife factual review and documentation of existing information on wildlife meet the requirements of Measure 1004(b)(l) of the Program. The mitigation, enhancement, and protection activities were considered. In mitigate for the losses to those resources resulting from the purpose of these wildlife mitigation status reports is to provide a resources at some of the Columbia River Basin hydroelectric projects the river and its tributaries. To accomplish this goal, the Council were written with the cooperation of project operators, and in within Idaho.

  17. Sex Differences in Objective and Projective Dependency Tests: A Meta-Analytic Review.

    Science.gov (United States)

    Bornstein, Robert F.

    1995-01-01

    A meta-analysis of 97 studies published since 1950 that assessed sex differences in scores on objective and projective dependency tests indicated that women consistently obtained higher dependency scores on objective tests, and men obtained higher scores on projective tests. Findings are discussed in terms of sex role socialization. (SLD)

  18. Project Management and sustainability - review of the 4th IPMA Research Conference 2016

    Directory of Open Access Journals (Sweden)

    Helgi Thor Ingason

    2017-06-01

    Full Text Available The 4th IPMA research conference was held on Project Management and Sustainability in Reykjavik, Iceland from September 14th - 16th 2016. In this article, we give a general outline of the structure of the conference, the main findings and what they mean for the project management community.

  19. pep-up: a review of the umgeni valley pro.ject evaluation process

    African Journals Online (AJOL)

    The evaluation process at the Umgeni Valle~ Project is.described. Its evolution, background and ... mental Education circles in Southern Africa. The ... t? the percei~ed need for evaluation of the Umgen1 Valley ProJect. ... This group, insisting that they were facilitating .... Phase : An integrated summary of all fielc and working ...

  20. Barriers and enablers to the provision of alcohol treatment among Aboriginal Australians: a thematic review of five research projects.

    Science.gov (United States)

    Gray, Dennis; Wilson, Mandy; Allsop, Steve; Saggers, Sherry; Wilkes, Edward; Ober, Coralie

    2014-09-01

    To review the results of five research projects commissioned to enhance alcohol treatment among Aboriginal Australians, and to highlight arising from them. Drafts of the papers were workshopped by project representatives, final papers reviewed and results summarised. Lessons arising were identified and described. While the impact of the projects varied, they highlight the feasibility of adapting mainstream interventions in Aboriginal Australian contexts. Outcomes include greater potential to: screen for those at risk; increase community awareness; build capacity and partnerships between organisations; and co-ordinate comprehensive referral networks and service provision. Results show a small investment can produce sustainable change and positive outcomes. However, to optimise and maintain investment, cultural difference needs to be recognised in both planning and delivery of alcohol interventions; resources and funding must be responsive to and realistic about the capacities of organisations; partnerships need to be formed voluntarily based on respect, equality and trust; and practices and procedures within organisations need to be formalised. There is no simple way to reduce alcohol-related harm in Aboriginal communities. However, the papers reviewed show that with Aboriginal control, modest investment and respectful collaboration, service enhancements and improved outcomes can be achieved. Mainstream interventions need to be adapted to Aboriginal settings, not simply transferred. The lessons outlined provide important reflections for future research. © 2014 Australasian Professional Society on Alcohol and other Drugs.

  1. Committee Report of the BEPC-II Project Design Review May 13-15, 2002, SLAC

    Energy Technology Data Exchange (ETDEWEB)

    Kawakami, Traci M.

    2002-08-26

    As part of the US-China Cooperative Program in High Energy Physics for the year 2002, a BEPC-II Upgrade Review meeting was held at SLAC, May 13-15, 2002. The upgrade is aimed at improving the luminosity and performance of the BEPC facility at IHEP in Beijing, China with major upgrades to the injector linac, storage ring, and detector. This review addresses mainly the accelerator related issues. Prior to the review, an updated Draft Design Report was made available to the review team. Most important technical change since April 2001 has been a change from a single-ring configuration to a doublering. The goal of the review is to determine whether BEPC-II, if built as described, will meet the operations and physics goals. The charge to the review team is attached as Appendix A.

  2. ANALYTICAL AND SCIENTIFIC REVIEW OF PROJECTS AND PROGRAMMES ON CHANGES STRATEGY IMPLEMENTATION

    Directory of Open Access Journals (Sweden)

    MLODETSKYY V. R.

    2017-01-01

    Full Text Available Formulation of the problem. Sustainable and successful functioning of the organization in today's competitive market conditions is possible if the organization is an open dynamic system capable of timely and adequately adapt to changes in the environment, this organization should initiate the implementation of innovations, both in production and organizational structure. Most suited for these conditions are project-oriented organizations, when the program's development strategy is developed with a detailed individual relatively independent stages, which are implemented as part of projects. In accordance with the development and improvement of the organization of control systems in the direction of increasing emphasis on the development strategy in relation to operating activities is an important task. Goal and tasks. Explore the hierarchical control system of project-oriented organization towards establishing information flows combine program management system with project management subsystems, included in this program. Conclusions. Concretized the concept of "program" and "project" as a result assumed that the program management is a permanent process in the organization that is adaptable to external changes, and project management (as defined is temporary, so the project management structure are subject to program management structures and are not permanent in the organization's management system.

  3. Critical review of the draft Area Recommendation Report and region-to-area screening methodology for the Crystalline Repository Project

    International Nuclear Information System (INIS)

    1986-01-01

    Two documents related to the Crystalline Repository Project have been reviewed. Comments and concerns related to the review of the ''Region-To-Area Screening Methodology'' and the ''Draft Area Recommendation Report'' are presented. These comments will be considered in preparation of the Final Area Recommendation Report, which will serve to formally identify potentially acceptable sites for a second repository in crystalline rock. Following a detailed review of the aforementioned documents, it is concluded that the identification of proposed potentially acceptable sites in the Draft Area Recommendation Report is based on questionable screening methodology and often incomplete data. As a result, ''favorable characteristics'' that are ascribed to each of the proposed potentially acceptable sites are, in many cases, misleading

  4. The International Science and Technology Center (ISTC) and ISTC projects related to nuclear safety. Information review

    International Nuclear Information System (INIS)

    Tocheny, Lev V.

    2003-01-01

    The ISTC is an intergovernmental organization created ten years ago by Russia, USA, EU and Japan in Moscow. The Center supports numerous science and technology projects in different areas, from biotechnologies and environmental problems to all aspects of nuclear studies, including those focused on the development of effective innovative concepts and technologies in the nuclear field, in general, and for improvement of nuclear safety, in particular. The presentation addresses some technical results of the ISTC projects as well as methods and approaches employed by the ISTC to foster close international collaboration and manage projects towards fruitful results. (author)

  5. Review of the Norwegian-Russian Cooperation on Safety Projects at Kola and Leningrad Nuclear Power Plants 2005 - 2009

    International Nuclear Information System (INIS)

    Mattsson, H.; Tishakov, P.

    2010-11-01

    In this report, Norwegian Radiation Protection Authority (NRPA) has reviewed the Norwegian funded projects on nuclear safety performed in the period 2005-2009 under the Norwegian Action Plan. NRPA has evaluated the progress of eight projects implemented by the Institute for Energy Technology (IFE) at Kola Nuclear Power Plant (KNPP) and Leningrad Nuclear Power Plant (LNPP). NRPA has visited the plants, inspected delivered equipment and discussed the projects implementation with relevant personnel at the plants. One of NRPA findings is that the equipment has been delivered to KNPP and LNPP, it is in regular use by competent personnel, and the equipment contributes to safety of both plants. Furthermore, the cooperation between three main project partners - IFE, LNPP and KNPP, seems to be very productive. NRPA's main conclusion is therefore that the projects have been implemented as described in IFE's project reports and that the goals are met. Furthermore, this report reviews safety levels at the KNPP and LNPP. Safety parameters at the plants indicate that the safety level has been significantly improved since early 1990s when the cooperation between Norway and Russia was initiated. Probabilistic safety assessment (PSA) values and number of INES (International Nuclear Event Scale) events, two internationally acknowledged safety parameters, indicate that the safety level has been much improved since the early 1990s when the cooperation between Norway and Russia started. Although it is clear that the Norwegian-funded projects have contributed positively to this development it is difficult to quantify the contribution. Moreover, the report also reviews the planned life-time of and the decommissioning plans for the reactors at KNPP and LNPP. Construction of new LNPP reactors has started and it is estimated that they will be operational in 2013- 2015. The license of the oldest reactor at LNPP expires in 2018 and if the new reactors are in operation by that time, it is

  6. Review of selected contributions of the conference 'Project control in quality management systems'

    International Nuclear Information System (INIS)

    2008-04-01

    There were 12 contributions presented of the conference focused on the project management in quality management systems. Contributions were focused both on theoretical problems from the project management area and on the applications in practice in management systems implementation in accordance with the standards: STN EN ISO 9001:2000, STN EN ISO 14 001:2005, and OHSAS 18 001:1999. One contribution was focused on the project management in the project of preparation of finishing of the building of the Nuclear Power Plant Mochovce of 3. and 4. block and one contribution was focused on the amendment of the Atomic Act or on the preparation of the new Atomic Act with regard to duty of transposition of the Directive of the Council 2006/117/Euratom on control and supervision of the overseas transportations of radioactive waste and nuclear fuel burnt-up into legislation of the Slovak Republic

  7. A Review of High School Level Astronomy Student Research Projects Over the Last Two Decades

    Science.gov (United States)

    Fitzgerald, M. T.; Hollow, R.; Rebull, L. M.; Danaia, L.; McKinnon, D. H.

    2014-09-01

    Since the early 1990s with the arrival of a variety of new technologies, the capacity for authentic astronomical research at the high school level has skyrocketed. This potential, however, has not realised the bright-eyed hopes and dreams of the early pioneers who expected to revolutionise science education through the use of telescopes and other astronomical instrumentation in the classroom. In this paper, a general history and analysis of these attempts is presented. We define what we classify as an Astronomy Research in the Classroom (ARiC) project and note the major dimensions on which these projects differ before describing the 22 major student research projects active since the early 1990s. This is followed by a discussion of the major issues identified that affected the success of these projects and provide suggestions for similar attempts in the future.

  8. Synchronizing Environmental Reviews for Transportation and Other Infrastructure Projects : 2015 Red Book.

    Science.gov (United States)

    2015-09-01

    The purpose of the Red Book is to function as a how to for synchronizing NEPA and other regulatory reviews. This handbook will be useful to Federal agencies that review permit applications, and Federal, State, and local agencies that fund or de...

  9. A review package for health impact assessment reports on development projects

    DEFF Research Database (Denmark)

    Cave, Ben; Jakobsen, Mette Winge

    2017-01-01

    this new purpose of the review package. The author will discuss advantages and disadvantages of using the review package in its existing format as a quality assurance tool and discuss possible options for revision. When contributing to the improvement of HIA practice, the actual use of that contribution...

  10. Athens automation and control experiment project review meeting, Knoxville, Tennessee, December 3-5, 1985

    Energy Technology Data Exchange (ETDEWEB)

    Braithwait, S.D.; Broadaway, E.R.; Fortson, N.D.; Gellings, C.W.; Hu, P.S.; Lawler, J.S.; Markel, L.C.; McKinley, K.F.; Monteen, L.D.; Newton, B.K.

    1986-08-01

    The AACE is an electric power distribution automation project involving research and development of both hardware and software. Equipment for the project is being installed on the electric distribution system in Athens, Tennessee. Purposes of the AACE are to develop and test load control, volt/var control, and system reconfiguration capabilities on an electric distribution system and to transfer what is learned to the electric utility industry. Expected benefits include deferral of costly power generation plants and increased electric service reliability.

  11. Annual DOE active solar heating and cooling contractors' review meeting. Premeeting proceedings and project summaries

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1981-09-01

    Ninety-three project summaries are presented which discuss the following aspects of active solar heating and cooling: Rankine solar cooling systems; absorption solar cooling systems; desiccant solar cooling systems; solar heat pump systems; solar hot water systems; special projects (such as the National Solar Data Network, hybrid solar thermal/photovoltaic applications, and heat transfer and water migration in soils); administrative/management support; and solar collector, storage, controls, analysis, and materials technology. (LEW)

  12. [Review and analysis of transplant biological research projects funded by National Natural Science Foundation of China].

    Science.gov (United States)

    Gong, Weihua; Sun, Ruijuan; Dong, Erdan

    2015-08-01

    To study the funding and achievements in the field of organ transplantation support by the National Natural Science Foundation of China (NSFC). A search of NSFC database was made by using the key word "transplantation" and excluding "bone marrow transplantation" for the projects funded between 1988 and 2013. SCI indexed publications that marked with NSFC project number were collected by searching each grant number in the database of the Web of Science. Six hundreds fifty-five projects were identified and received about 220 million yuan in grant funding. These funded research projects were distributed among 25 provinces and autonomous regions, however, which were mainly in the developed coastal areas; of them, 43 (6.56%) projects were granted in xenotransplantation and 17 projects (2.60%) were funded in the field of traditional Chinese medicine-related organ transplantation; Transplantation on blood vessels, heart, kidney, liver, lung, small intestine, pancreatic, cornea, trachea, skin, etc. were primarily performed in research. Nine hundreds and sixty-one SCI-indexed publications were achieved. Magnitude and intensity of NSFC funding, output of SCI publications have been increasing, suggesting that NSFC positively promotes the development of organ transplantation. Although a great progress of transplantation has been made, basic and translational studies should be vigorously strengthened.

  13. Projecting changes in the distribution and productivity of living marine resources: A critical review of the suite of modelling approaches used in the large European project VECTORS

    Science.gov (United States)

    Peck, Myron A.; Arvanitidis, Christos; Butenschön, Momme; Canu, Donata Melaku; Chatzinikolaou, Eva; Cucco, Andrea; Domenici, Paolo; Fernandes, Jose A.; Gasche, Loic; Huebert, Klaus B.; Hufnagl, Marc; Jones, Miranda C.; Kempf, Alexander; Keyl, Friedemann; Maar, Marie; Mahévas, Stéphanie; Marchal, Paul; Nicolas, Delphine; Pinnegar, John K.; Rivot, Etienne; Rochette, Sébastien; Sell, Anne F.; Sinerchia, Matteo; Solidoro, Cosimo; Somerfield, Paul J.; Teal, Lorna R.; Travers-Trolet, Morgan; van de Wolfshaar, Karen E.

    2018-02-01

    We review and compare four broad categories of spatially-explicit modelling approaches currently used to understand and project changes in the distribution and productivity of living marine resources including: 1) statistical species distribution models, 2) physiology-based, biophysical models of single life stages or the whole life cycle of species, 3) food web models, and 4) end-to-end models. Single pressures are rare and, in the future, models must be able to examine multiple factors affecting living marine resources such as interactions between: i) climate-driven changes in temperature regimes and acidification, ii) reductions in water quality due to eutrophication, iii) the introduction of alien invasive species, and/or iv) (over-)exploitation by fisheries. Statistical (correlative) approaches can be used to detect historical patterns which may not be relevant in the future. Advancing predictive capacity of changes in distribution and productivity of living marine resources requires explicit modelling of biological and physical mechanisms. New formulations are needed which (depending on the question) will need to strive for more realism in ecophysiology and behaviour of individuals, life history strategies of species, as well as trophodynamic interactions occurring at different spatial scales. Coupling existing models (e.g. physical, biological, economic) is one avenue that has proven successful. However, fundamental advancements are needed to address key issues such as the adaptive capacity of species/groups and ecosystems. The continued development of end-to-end models (e.g., physics to fish to human sectors) will be critical if we hope to assess how multiple pressures may interact to cause changes in living marine resources including the ecological and economic costs and trade-offs of different spatial management strategies. Given the strengths and weaknesses of the various types of models reviewed here, confidence in projections of changes in the

  14. Safety cases for radioactive waste disposal facilities: guidance on confidence building and regulatory review IAEA-ASAM co-ordinated research project

    International Nuclear Information System (INIS)

    Ben Belfadhel, M.; Bennett, D.G.; Metcalf, P.; Nys, V.; Goldammer, W.

    2008-01-01

    The IAEA has been conducting two co-ordinated research programmes (CRPs) projects to develop and apply improved safety assessment methodologies for near-surface radioactive waste disposal facilities. The more recent of these projects, ASAM (application of safety assessment methodologies), included a Regulatory Review Working Group (RRWG) which has been working to develop guidance on how to gain confidence in safety assessments and safety cases, and on how to conduct regulatory reviews of safety assessments. This paper provides an overview of the ASAM project, focusing on the safety case and regulatory review. (authors)

  15. [Quality Assurance in Sociomedical Evaluation by Peer Review: A Pilot Project of the German Statutory Pension Insurance].

    Science.gov (United States)

    Strahl, A; Gerlich, C; Wolf, H-D; Gehrke, J; Müller-Garnn, A; Vogel, H

    2016-03-01

    The sociomedical evaluation by the German Pension Insurance serves the purpose of determining entitlement to disability pensions. A quality assurance concept for the sociomedical evaluation was developed, which is based on a peer Review process. Peer review is an established process of external quality assurance in health care. The review is based on a hierarchically constructed manual that was evaluated in this pilot project. The database consists of 260 medical reports for disability pension of 12 pension insurance agencies. 771 reviews from 19 peers were included in the evaluation of the inter-rater reliability. Kendall's coefficient of concordance W for more than 2 raters is used as primary measure of inter-rater reliability. Reliability appeared to be heterogeneous. Kendalls W varies for the particular criteria from 0.09 to 0.88 and reached for primary criterion reproducibility a value of 0.37. The reliability of the manual seemed acceptable in the context of existing research data and is in line with existing peer review research outcomes. Nevertheless, the concordance is limited and requires optimisation. Starting points for improvement can be seen in a systematic training and regular user meetings of the peers involved. © Georg Thieme Verlag KG Stuttgart · New York.

  16. Economic Development Impacts of Community Wind Projects: A Review and Empirical Evaluation; Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Lantz, E.; Tegen, S.

    2009-04-01

    'Community wind' refers to a class of wind energy ownership structures. The extent of local ownership may range from a small minority share to full ownership by persons in the immediate area surrounding the wind project site. Potential project owners include local farmers, businesses, Native American tribes, universities, cooperatives, or any other local entity seeking to invest in wind energy. The opposite of community wind is an 'absentee' project, in which ownership is completely removed from the state and community surrounding the facility. Thus, there is little or no ongoing direct financial benefit to state and local populations aside from salaries for local repair technicians, local property tax payments, and land lease payments. In recent years, the community wind sector has been inhibited by manufacturers' preference for larger turbine orders. This often puts smaller community wind developers and projects at a competitive disadvantage. However, state policies specifically supporting community wind may become a more influential market factor as turbines are now more readily available given manufacturer ramp-ups and the slow-down in the industry that has accompanied the recent economic and financial crises. This report examines existing literature to provide an overview of economic impacts resulting from community wind projects, compares results, and explains variability.

  17. Economic Development Impacts of Community Wind Projects. A Review and Empirical Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Lantz, E. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Tegen, S. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2009-04-01

    "Community wind" refers to a class of wind energy ownership structures. The extent of local ownership may range from a small minority share to full ownership by persons in the immediate area surrounding the wind project site. Potential project owners include local farmers, businesses, Native American tribes, universities, cooperatives, or any other local entity seeking to invest in wind energy. The opposite of community wind is an "absentee" project, in which ownership is completely removed from the state and community surrounding the facility. Thus, there is little or no ongoing direct financial benefit to state and local populations aside from salaries for local repair technicians, local property tax payments, and land lease payments. In recent years, the community wind sector has been inhibited by manufacturers' preference for larger turbine orders. This often puts smaller community wind developers and projects at a competitive disadvantage. However, state policies specifically supporting community wind may become a more influential market factor as turbines are now more readily available given manufacturer ramp-ups and the slow-down in the industry that has accompanied the recent economic and financial crises. This report examines existing literature to provide an overview of economic impacts resulting from community wind projects, compares results, and explains variability.

  18. Conceptual design review report for K Basin Dose Reduction Project clean and coat task

    International Nuclear Information System (INIS)

    Blackburn, L.D.

    1996-01-01

    The strategy for reducing radiation dose originating from radionuclides absorbed in the concrete is to raise the pool water level to provide additional shielding. The concrete walls need to be coated to prevent future radionuclide absorption into the walls. This report documents a conceptual design review of equipment to clean and coat basin walls. The review concluded that the proposed concepts were and acceptable basis for proceeding with detailed final design

  19. Final design review report for K Basin Dose Reduction Project Clean and Coat Task

    International Nuclear Information System (INIS)

    Blackburn, L.D.

    1996-02-01

    The strategy for reducing radiation dose originating from radionuclides absorbed in the concrete is to raise the pool water level to provide additional shielding. The concrete walls need to be coated to prevent future radionuclide absorption into the walls. This report documents a final design review of equipment to clean and coat basin walls. The review concluded that the design presented was acceptable for release for fabrication

  20. Independent management and financial review, Yucca Mountain Project, Nevada. Final report, Appendix

    International Nuclear Information System (INIS)

    1995-01-01

    The Nuclear Waste Policy Act of 1982 (Public Law 97-425), as amended by Public Law 100-203, December 22, 1987, established the Office of Civilian Radioactive Waste Management (OCRWM) within the Department of Energy (DOE), and directed the Office to investigate a site at Yucca Mountain, Nevada, to determine if this site is suitable for the construction of a repository for the disposal of high level nuclear waste. Work on site characterization has been under way for several years. Thus far, about $1.47 billion have been spent on Yucca Mountain programs. This work has been funded by Congressional appropriations from a Nuclear Waste Fund to which contributions have been made by electric utility ratepayers through electric utilities generating power from nuclear power stations. The Secretary of Energy and the Governor of the State of Nevada have appointed one person each to a panel to oversee an objective, independent financial and management evaluation of the Yucca Mountain Project. The Requirements for the work will include an analysis of (1) the Yucca Mountain financial and, contract management techniques and controls; (2) Project schedules and credibility of the proposed milestones; (3) Project organizational effectiveness and internal planning processes, and (4) adequacy of funding levels and funding priorities, including the cost of infrastructure and scientific studies. The recipient will provide monthly progress report and the following reports/documents will be presented as deliverables under the contract: (1) Financial and Contract Management Preliminary Report; (2) Project Scheduling Preliminary Report; (3)Project Organizational Effectiveness Preliminary Report; (4) Project Funding Levels and Funding Priorities Preliminary Report; and (5) Final Report

  1. Independent management and financial review, Yucca Mountain Project, Nevada. Final report, Appendix

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-15

    The Nuclear Waste Policy Act of 1982 (Public Law 97-425), as amended by Public Law 100-203, December 22, 1987, established the Office of Civilian Radioactive Waste Management (OCRWM) within the Department of Energy (DOE), and directed the Office to investigate a site at Yucca Mountain, Nevada, to determine if this site is suitable for the construction of a repository for the disposal of high level nuclear waste. Work on site characterization has been under way for several years. Thus far, about $1.47 billion have been spent on Yucca Mountain programs. This work has been funded by Congressional appropriations from a Nuclear Waste Fund to which contributions have been made by electric utility ratepayers through electric utilities generating power from nuclear power stations. The Secretary of Energy and the Governor of the State of Nevada have appointed one person each to a panel to oversee an objective, independent financial and management evaluation of the Yucca Mountain Project. The Requirements for the work will include an analysis of (1) the Yucca Mountain financial and, contract management techniques and controls; (2) Project schedules and credibility of the proposed milestones; (3) Project organizational effectiveness and internal planning processes, and (4) adequacy of funding levels and funding priorities, including the cost of infrastructure and scientific studies. The recipient will provide monthly progress report and the following reports/documents will be presented as deliverables under the contract: (1) Financial and Contract Management Preliminary Report; (2) Project Scheduling Preliminary Report; (3)Project Organizational Effectiveness Preliminary Report; (4) Project Funding Levels and Funding Priorities Preliminary Report; and (5) Final Report.

  2. Review of selected non-seismic methods for onshore hydrocarbon exploration in Denmark. ALTKUL project report part 1

    Energy Technology Data Exchange (ETDEWEB)

    Rasmussen, T.M.; Thorning, L.

    2012-09-15

    Project ALTKUL was commissioned by DONG E and P A/S and Nordsoefonden; the Danish Energy Agency followed the project closely. The starting point of the study was the need in Danish onshore areas for more knowledge on alternative methods that could be used for hydrocarbon exploration, as an alternative to seismic investigations. DONG E and P A/S and Nordsoefonden approached GEUS, suggesting a study of seven different methods. The Danish Energy Agency was interested in the subject and requested that an actual test of a method be carried out as a part of the project. The seven methods considered and reviewed are: 1: Surface geochemistry; 2: Gravimetric modelling; 3: Magnetotellurics (MT, AMT and ZTEM); 4: High-Moment Electromagnetics (HMEM); 5: High-Powered Spectral Induced Polarization (HPSIP); 6: Electron Para-magnetic Resonance (EPR); 7: Airborne Transient Pulse Surveys. Getting a test of one of the methods based on electromagnetic theory organised caused some difficulties. An experiment with a galvanic controlled source was considered to be the optimum choice. However, based on various contacts and failed attempts to organise a test, a contract was entered with Uppsala University for some initial tests of the MT method. The test is to be carried out in August 2012 and will be reported in a separate report (ALTKUL Project Report Part 2). (LN)

  3. DOES QUALITY IMPROVEMENT IMPROVE PATIENTS’ HEALTH? A SYSTEMATIC REVIEW OF MEASURES OF EFFECT USED IN PDSA PROJECTS

    DEFF Research Database (Denmark)

    Hermansen, Nanna Kastrup; Vestergaard, Anne Sig; Ehlers, Lars Holger

    , and if the authors provide scientific evidence that their choice of effect measure, i.e. the quality indicator, is associated with patients’ health. Methods The basis of the present study was a systematic review of studies on PDSA quality improvement projects published in 2015-2017. For all identified papers...... as such. Conclusion Process indicators, rather than health-related outcome measures, appear to be used most often in quality improvement projects applying the PDSA method. Evidence-based indicators were only applied in four studies. Overall, this challenges the ability to show if, and how, interventions......Abstract Introduction Quality improvement is an inherent part of modern healthcare systems worldwide, used for the continuous advancement in effectiveness and safety. Amongst other approaches, the plan-do-study-act (PDSA) method, a four-step iterative method, is widely used for testing...

  4. 2008 State-of-the-Art : High Level Radioactive Waste Disposal Facilities and Project Review of Proceding Countries

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Heui Joo; Choi, Jong Won; Lee, Jong Youl; Jung, Jong Tae; Kim, Sung Ki; Lee, Min Soo; Cho, Dong Keun; Kook, Dong Hak

    2008-11-15

    High level radioactive waste disposal system project for advanced nuclear fuel cycle produced this report which are dealing with the repository status of proceding countries as of 2008. This report has brief review on disposal facilities which are operating and will be operating and on future plan of those nations. The other report 'Development of the Geological Disposal System for High Level Waste' which was produced like this report time and this report would help the readers grasp the current repository status. Because our country is a latecomer in the HLW disposal world, it is strongly recommended to catch up with advanced disposal system and concepts of developed nations and this report is expected to make it possible. There are several nations which were the main survey target; Finland, USA, Sweden, Germany, France, Switzerland, and Japan. Recent information was applied to this report and our project team will produce annual state-of-the-art report with continuous updates.

  5. Literature Review for Texas Department of Transportation Research Project 0-4695: Guidance for Design in Areas of Extreme Bed-Load Mobility, Edwards Plateau, Texas

    National Research Council Canada - National Science Library

    Heitmuller, Franklin T; Asquith, William H; Fang, Xing; Thompson, David B; Wang, Keh-Han

    2005-01-01

    A review of the literature addressing sediment transport in gravel-bed river systems and structures designed to control bed-load mobility is provided as part of Texas Department of Transportation research project 0-4695...

  6. Report of the South Texas Project Allegations Review Team. Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et al.

    Energy Technology Data Exchange (ETDEWEB)

    Kokajko, L.; Skay, D.; Wang, H.; Murphy, D. [Nuclear Regulatory Commission, Washington, DC (United States)

    1995-03-01

    This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation.

  7. Report of the South Texas Project Allegations Review Team. Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et al

    International Nuclear Information System (INIS)

    Kokajko, L.; Skay, D.; Wang, H.; Murphy, D.

    1995-03-01

    This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation

  8. Review of the water management systems in the Gujarat Medium Irrigation II Project (Credit 1496-IN)

    NARCIS (Netherlands)

    Brouwer, R.

    1993-01-01

    Different activities are ongoing in the Medium Irrigation II project simultaneously. These are: - emancipation of farmers through their involvement in the operation and management; - change over from Sheshpali type water management to RWS type water management; - design and construction of remaining

  9. Highlights from a Literature Review Prepared for the Face to Face Research Project

    Science.gov (United States)

    National Literacy Trust, 2010

    2010-01-01

    Between March 2009 and March 2011, Talk To Your Baby has been engaged in a research project, under the title of Face to Face, to identify key messages for parents and carers in relation to communicating with babies and young children, and has examined the most effective ways to promote these messages to parents and carers. The Face to Face project…

  10. One Hundred Dissertations: A Review of the Morale Research Project, University of New England.

    Science.gov (United States)

    Smith, Kevin R.

    1987-01-01

    Describes the use of the "staff morale questionnaires" developed at University of New England from 100 graduate student dissertations on morale in a variety of educational institutions. The project helped off-campus students develop their academic critical abilities and enabled school administrators to understand the importance of…

  11. Review of US ESCO industry market trends: an empirical analysis of project data

    Energy Technology Data Exchange (ETDEWEB)

    Goldman, C.A.; Hopper, N.C.; Osborn, J.G. [Lawrence Berkeley National Laboratory, Berkeley, CA (United States). Energy Analysis

    2005-02-01

    This comprehensive empirical analysis of US energy service company (ESCO) industry trends and performance employs two parallel analytical approaches: a survey of firms to estimate total industry size, and a database of {approx}1500 ESCO projects, from which we report target markets and typical project characteristics, energy savings and customer economics. We estimate that industry investment for energy-efficiency related services reached US$2 billion in 2000 following a decade of strong growth. ESCO activity is concentrated in states with high economic activity and strong policy support. Typical projects save 150-200 MJ/m{sup 2}/year and are cost-effective with median benefit/cost ratios of 1.6 and 2.1 for institutional and private sector projects. The median simple payback time (SPT) is 7 years among institutional customers; 3 years is typical in the private sector. Reliance on DSM incentives has decreased since 1995. Preliminary evidence suggests that state enabling policies have boosted the industry in medium-sized states. ECSOs have proven resilient in the face of restructuring and will probably shift toward selling 'energy solutions', with energy efficiency part of a package. We conclude that appropriate policy support - both financial and non-financial - can 'jump-start' a viable private-sector energy-efficiency services industry that targets large institutional and commercial/industrial customers. (author)

  12. A review of community-based solar home system projects in the Philippines

    Directory of Open Access Journals (Sweden)

    Macabebe Erees Queen B.

    2016-01-01

    Full Text Available Solar Home Systems (SHS are easy to deploy in island and in remote communities where grid connection is costly. However, issues related to maintenance of these systems emerge after they are deployed because of the remoteness and inaccessibility of the communities. This study looked into community-based programs in the Philippines and investigated the following: (1 social preparation, (2 role of the community in the project, and (3 sustainability of the program. In this paper, three communities under two government programs offering SHS are presented. These programs are the Solar Power Technology Support (SPOTS program of the Department of Agrarian Reform (DAR and the Household Electrification Program (HEP of the Department of Energy (DOE. A focused group discussion and key informant interviews were conducted in two communities in Bukidnon province and in a community in Kalinga to obtain information from the project beneficiaries and SHS users on the preparation, implementation and maintenance of the projects. The results revealed that emphasis on the economic value of the technology, proper training of the locals on the technical and management aspects of the project, as well as the establishment of a supply chain for replacement parts are crucial factors for the sustainability of the programs.

  13. 78 FR 26319 - Deepwater Horizon Oil Spill; Proposal of Future Early Restoration Projects and Environmental Reviews

    Science.gov (United States)

    2013-05-06

    ... selected and implemented in accordance with the Oil Pollution Act of 1990 (OPA), the Framework Agreement... oil spill under the Oil Pollution Act 1990 (OPA; 33 U.S.C. 2701 et seq.). Pursuant to OPA, federal and... cost of this project is approximately $3.5 million. Sea Rim State Park Amenities (Jefferson County...

  14. Review of US ESCO industry market trends: an empirical analysis of project data

    International Nuclear Information System (INIS)

    Goldman, Charles A.; Hopper, Nicole C.; Osborn, Julie G.

    2005-01-01

    This comprehensive empirical analysis of US energy service company (ESCO) industry trends and performance employs two parallel analytical approaches: a survey of firms to estimate total industry size, and a database of ∼1500 ESCO projects, from which we report target markets and typical project characteristics, energy savings and customer economics. We estimate that industry investment for energy-efficiency related services reached US$2 billion in 2000 following a decade of strong growth. ESCO activity is concentrated in states with high economic activity and strong policy support. Typical projects save 150-200 MJ/m 2 /year and are cost-effective with median benefit/cost ratios of 1.6 and 2.1 for institutional and private sector projects. The median simple payback time (SPT) is 7 years among institutional customers; 3 years is typical in the private sector. Reliance on DSM incentives has decreased since 1995. Preliminary evidence suggests that state enabling policies have boosted the industry in medium-sized states. ESCOs have proven resilient in the face of restructuring and will probably shift toward selling 'energy solutions', with energy efficiency part of a package. We conclude that appropriate policy support - both financial and non-financial - can 'jump-start' a viable private-sector energy-efficiency services industry that targets large institutional and commercial/industrial customers

  15. Review of US ESCO industry market trends: an empirical analysis of project data

    International Nuclear Information System (INIS)

    Goldman, C.A.; Hopper, N.C.; Osborn, J.G.

    2005-01-01

    This comprehensive empirical analysis of US energy service company (ESCO) industry trends and performance employs two parallel analytical approaches: a survey of firms to estimate total industry size, and a database of ∼1500 ESCO projects, from which we report target markets and typical project characteristics, energy savings and customer economics. We estimate that industry investment for energy-efficiency related services reached US$2 billion in 2000 following a decade of strong growth. ESCO activity is concentrated in states with high economic activity and strong policy support. Typical projects save 150-200 MJ/m 2 /year and are cost-effective with median benefit/cost ratios of 1.6 and 2.1 for institutional and private sector projects. The median simple payback time (SPT) is 7 years among institutional customers; 3 years is typical in the private sector. Reliance on DSM incentives has decreased since 1995. Preliminary evidence suggests that state enabling policies have boosted the industry in medium-sized states. ECSOs have proven resilient in the face of restructuring and will probably shift toward selling 'energy solutions', with energy efficiency part of a package. We conclude that appropriate policy support - both financial and non-financial - can 'jump-start' a viable private-sector energy-efficiency services industry that targets large institutional and commercial/industrial customers. (author)

  16. Review of U.S. ESCO industry market trends: An empirical analysis of project data

    Energy Technology Data Exchange (ETDEWEB)

    Goldman, Charles A.; Hopper, Nicole C.; Osborn, Julie G.; Singer, Terry E.

    2003-03-01

    This article summarizes a comprehensive empirical analysis of U.S. Energy Service Company (ESCO) industry trends and performance. We employ two parallel analytical approaches: a comprehensive survey of firms to estimate total industry size and a database of {approx}1500 ESCO projects, from which we report target markets and typical project characteristics, energy savings and customer economics. We estimate that industry investment for energy-efficiency related services reached US $2 billion in 2000 following a decade of strong growth. ESCO activity is concentrated in states with high economic activity and strong policy support. Typical projects save 150-200 MJ/m2/year and are cost-effective with median benefit/cost ratios of 1.6 and 2.1 for institutional and private sector projects. The median simple payback time is 7 years among institutional customers; 3 years is typical in the private sector. Reliance on DSM incentives has decreased since 1995. Preliminary evidence suggests that state enabling policies have boosted the industry in medium-sized states. ESCOs have proven resilient in the face of restructuring and will probably shift toward selling ''energy solutions,'' with energy efficiency part of a package. We conclude that a private sector energy-efficiency services industry that targets large commercial and industrial customers is viable and self-sustaining with appropriate policy support both financial and non-financial.

  17. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 89

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    Summaries are presented for the DOE contracts related to supported research for thermal recovery of petroleum, geoscience technology, and field demonstrations in high-priority reservoir classes. Data included for each project are: title, contract number, principal investigator, research organization, beginning date, expected completion date, amount of award, objectives of the research, and summary of technical progress.

  18. Technical review of US Department of Energy draft area recommendation report for the crystalline repository project

    International Nuclear Information System (INIS)

    1986-04-01

    Foth and Van Dyke and Associates Inc. was retained by the Stockbridge-Munsee Community to evaluate the DOE's screening process for selection of candidate areas in crystalline rock terranes, and critically review the geologic and environmental factors utilized by the DOE in selecting the NC-3 area as a potentially acceptable site (PAS). We have reviewed the DOE's Draft Area Recommendation Report (ARR) issued in January 1986, and prepared our comments. In addition, geologic and environmental data pertaining to the Stockbridge-Munsee community and vicinity that was not included in the Draft ARR is presented. 24 refs., 7 figs., 4 tabs

  19. Seismic Safety Margins Research Program (Phase I). Project IV. Structural building response; Structural Building Response Review

    International Nuclear Information System (INIS)

    Healey, J.J.; Wu, S.T.; Murga, M.

    1980-02-01

    As part of the Phase I effort of the Seismic Safety Margins Research Program (SSMRP) being performed by the University of California Lawrence Livermore Laboratory for the US Nuclear Regulatory Commission, the basic objective of Subtask IV.1 (Structural Building Response Review) is to review and summarize current methods and data pertaining to seismic response calculations particularly as they relate to the objectives of the SSMRP. This material forms one component in the development of the overall computational methodology involving state of the art computations including explicit consideration of uncertainty and aimed at ultimately deriving estimates of the probability of radioactive releases due to seismic effects on nuclear power plant facilities

  20. [Review of draft Crystalline Repository Project reports]: Technical progress report, CY 1985-1986

    International Nuclear Information System (INIS)

    1986-01-01

    During the period (CY 1985-86) of this report, the Wisconsin Radioactive Waste Review Board provided technical services under the contract with DOE. These included Participation in the development of variables and screening techniques that would be used in identifying those rock bodies in the Area Recommendation Report (ARR); reviewing and commenting on the report and developing a procedure in which local residents could have input into the process; sought resumption of negotiations with DOE on a full Consultation and Cooperation (CandC) agreement; and Participating in workshops and provided comments on two major DOE transportation documents, ''Transportation Business Plan: Strategy Options Document,'' and ''Transportation Institutional Plan.''

  1. Project Management

    DEFF Research Database (Denmark)

    Pilkington, Alan; Chai, Kah-Hin; Le, Yang

    2015-01-01

    This paper identifies the true coverage of PM theory through a bibliometric analysis of the International Journal of Project Management from 1996-2012. We identify six persistent research themes: project time management, project risk management, programme management, large-scale project management......, project success/failure and practitioner development. These differ from those presented in review and editorial articles in the literature. In addition, topics missing from the PM BOK: knowledge management project-based organization and project portfolio management have become more popular topics...

  2. Export Odyssey: An Exposition and Analytical Review of Literature Concerning an Undergraduate Student Project in International Marketing on Key Teaching-Learning Dimensions.

    Science.gov (United States)

    Williamson, Nicholas C.

    2001-01-01

    Describes Export Odyssey (EO), a structured, Internet-intensive, team-based undergraduate student project in international marketing. Presents an analytical review of articles in the literature that relate to three key teaching-learning dimensions of student projects (experiential versus non-experiential active learning, team-based versus…

  3. Projecting the Bethe-Salpeter Equation onto the Light-Front and Back: A Short Review

    International Nuclear Information System (INIS)

    Frederico, T.; Salme, G.

    2011-01-01

    The technique of projecting the four-dimensional two-body Bethe-Salpeter equation onto the three-dimensional Light-Front hypersurface, combined with the quasi-potential approach, is briefly illustrated, by placing a particular emphasis on the relation between the projection method and the effective dynamics of the valence component of the Light-Front wave function. Some details on how to construct the Fock expansion of both (a) the Light-Front effective interaction and (b) the electromagnetic current operator, satisfying the proper Ward-Takahashi identity, will be presented, addressing the relevance of the Fock content in the operators living onto the Light-Front hypersurface. Finally, the generalization of the formalism to the three-particle case will be outlined. (author)

  4. River Protection Project (RPP) Readiness-to-Proceed 2 Internal Independent Review Team Final Report

    International Nuclear Information System (INIS)

    SCHAUS, P.S.

    2000-01-01

    This report describes the results of an independent review team brought in to assess CH2M HILL Hanford's readiness and ability to support the RPP's move into its next major phase - retrieval and delivery of tank waste to the Privatization Contractor

  5. River Protection Project (RPP) Readiness-to-Proceed 2 Internal Independent Review Team Final Report

    International Nuclear Information System (INIS)

    SCHAUS, P.S.

    2000-01-01

    This report describes the results of an independent review team brought in to assess CH2M Hill Hanford Group's readiness and ability to support the RPP's move into its next major phase - retrieval and delivery of tank waste to the Privatization Contractor

  6. IPM in Asia - A review of existing projects in the Philippines and Indonesia

    OpenAIRE

    Wynn, Nigel R.; Schiffers, Bruno; Seghers, N.; Deuse, J.P.L.; Cooper, J.F.; Copin, Alfred; Coste, C.M.

    1997-01-01

    Integrated Pest Management means a pest management system that, in the context of the associated environment and the population dynamics of the pest species, utilizes ail suitable techniques and methods in as compatible a manner as possible and maintains the pest populations at levels below those causing economically unacceptable damage or 1055. FAO-Code- of Conduct 1984. Peer reviewed

  7. 78 FR 63276 - Interim Policy, FAA Review of Solar Energy System Projects on Federally Obligated Airports

    Science.gov (United States)

    2013-10-23

    ... the orientation and tilt of the solar energy panels, reflectance, environment, and ocular factors are... energy systems on the airport must attach the SGHAT report, outlining solar panel glare and ocular impact... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Interim Policy, FAA Review of Solar...

  8. Blended learning in situated contexts: 3-year evaluation of an online peer review project.

    Science.gov (United States)

    Bridges, S; Chang, J W W; Chu, C H; Gardner, K

    2014-08-01

    Situated and sociocultural perspectives on learning indicate that the design of complex tasks supported by educational technologies holds potential for dental education in moving novices towards closer approximation of the clinical outcomes of their expert mentors. A cross-faculty-, student-centred, web-based project in operative dentistry was established within the Universitas 21 (U21) network of higher education institutions to support university goals for internationalisation in clinical learning by enabling distributed interactions across sites and institutions. This paper aims to present evaluation of one dental faculty's project experience of curriculum redesign for deeper student learning. A mixed-method case study approach was utilised. Three cohorts of second-year students from a 5-year bachelor of dental surgery (BDS) programme were invited to participate in annual surveys and focus group interviews on project completion. Survey data were analysed for differences between years using multivariate logistical regression analysis. Thematic analysis of questionnaire open responses and interview transcripts was conducted. Multivariate logistic regression analysis noted significant differences across items over time indicating learning improvements, attainment of university aims and the positive influence of redesign. Students perceived the enquiry-based project as stimulating and motivating, and building confidence in operative techniques. Institutional goals for greater understanding of others and lifelong learning showed improvement over time. Despite positive scores, students indicated global citizenship and intercultural understanding were conceptually challenging. Establishment of online student learning communities through a blended approach to learning stimulated motivation and intellectual engagement, thereby supporting a situated approach to cognition. Sociocultural perspectives indicate that novice-expert interactions supported student development of

  9. Implementation Plan for the Hawaii Geothermal Project Environmental Impact Statement (DOE Review Draft:)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-09-18

    The US Department of Energy (DOE) is preparing an Environmental Impact Statement (EIS) that identifies and evaluates the environmental impacts associated with the proposed Hawaii Geothermal Project (HGP), as defined by the State of Hawaii in its 1990 proposal to Congress (DBED 1990). The location of the proposed project is shown in Figure 1.1. The EIS is being prepared pursuant to the requirements of the National Environmental Policy Act of 1969 (NEPA), as implemented by the President's Council on Environmental Quality (CEQ) regulations (40 CFR Parts 1500-1508) and the DOE NEPA Implementing Procedures (10 CFR 1021), effective May 26, 1992. The State's proposal for the four-phase HGP consists of (1) exploration and testing of the geothermal resource beneath the slopes of the active Kilauea volcano on the Island of Hawaii (Big Island), (2) demonstration of deep-water power cable technology in the Alenuihaha Channel between the Big Island and Mau, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands. DOE prepared appropriate NEPA documentation for separate federal actions related to Phase 1 and 2 research projects, which have been completed. This EIS will consider Phases 3 and 4, as well as reasonable alternatives to the HGP. Such alternatives include biomass coal, solar photovoltaic, wind energy, and construction and operation of commercial geothermal power production facilities on the Island of Hawaii (for exclusive use on the Big Island). In addition, the EIs will consider the reasonable alternatives among submarine cable technologies, geothermal extraction, production, and power generating technologies; pollution control technologies; overland and submarine power transmission routes; sites reasonably suited to

  10. A review and an outlook of the National Cultural Information Resources Sharing Project

    Institute of Scientific and Technical Information of China (English)

    ZHANG; Yanbo

    2008-01-01

    This paper discusses the Project’s organization system,technical system,creation of digital resources and service mode.It also summarizes achievements gained since the commencement of the Project,and also analyzes some of the more important issues during implementation stage and gives a few suggestions of the future development during the next stage of the 11thFive-Year Plan.

  11. ISTC: experimental and technology programs toward novel reactor concepts (review of the ISTC projects and programs)

    Energy Technology Data Exchange (ETDEWEB)

    Tocheny, L.V. [ISTC - International Science and Technology Center, Moscow, Russia, Moscow (Russian Federation)

    2007-07-01

    The ISTC (International Science and Technology Center) is a unique international organization created in Moscow more than twelve years ago by Russia, Usa, E.U. and Japan. Later Korea and Canada, and several CIS countries as well acceded to ISTC. The basic idea behind establishing the ISTC was to support non-proliferation of the mass destruction weapons technologies by re-directing former Soviet weapons scientists to peaceful research thus preventing the drain of dangerous knowledge and expertise from Russia and other CIS countries. Numerous science and technology projects were realized with the ISTC support in different areas, from bio-technologies and environmental problems to all aspects of nuclear studies, including those focused on the development of effective innovative concepts and technologies in the nuclear field, in general, and for improvement of nuclear safety, in particular. The presentation addresses some technical results of the ISTC projects as well as methods and approaches employed by the ISTC to foster close international collaboration and manage projects towards fruitful results. Goals of this presentation are to introduce some of the ISTC programs to international nuclear community to give examples of international cooperation, created in the frames of ISTC, to illustrate the statement of importance of international nuclear experiment as a tool for evidence of new nuclear concepts acceptance, and to make a call for further joint collaboration. (author)

  12. ISTC: experimental and technology programs toward novel reactor concepts (review of the ISTC projects and programs)

    International Nuclear Information System (INIS)

    Tocheny, L.V.

    2007-01-01

    The ISTC (International Science and Technology Center) is a unique international organization created in Moscow more than twelve years ago by Russia, Usa, E.U. and Japan. Later Korea and Canada, and several CIS countries as well acceded to ISTC. The basic idea behind establishing the ISTC was to support non-proliferation of the mass destruction weapons technologies by re-directing former Soviet weapons scientists to peaceful research thus preventing the drain of dangerous knowledge and expertise from Russia and other CIS countries. Numerous science and technology projects were realized with the ISTC support in different areas, from bio-technologies and environmental problems to all aspects of nuclear studies, including those focused on the development of effective innovative concepts and technologies in the nuclear field, in general, and for improvement of nuclear safety, in particular. The presentation addresses some technical results of the ISTC projects as well as methods and approaches employed by the ISTC to foster close international collaboration and manage projects towards fruitful results. Goals of this presentation are to introduce some of the ISTC programs to international nuclear community to give examples of international cooperation, created in the frames of ISTC, to illustrate the statement of importance of international nuclear experiment as a tool for evidence of new nuclear concepts acceptance, and to make a call for further joint collaboration. (author)

  13. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project KDP-C Review

    Science.gov (United States)

    Grindle, Laurie; Sakahara, Robert; Hackenberg, Davis; Johnson, William

    2017-01-01

    The topics discussed are the UAS-NAS project life-cycle and ARMD thrust flow down, as well as the UAS environments and how we operate in those environments. NASA's Armstrong Flight Research Center at Edwards, CA, is leading a project designed to help integrate unmanned air vehicles into the world around us. The Unmanned Aircraft Systems Integration in the National Airspace System project, or UAS in the NAS, will contribute capabilities designed to reduce technical barriers related to safety and operational challenges associated with enabling routine UAS access to the NAS. The project falls under the Integrated Systems Research Program office managed at NASA Headquarters by the agency's Aeronautics Research Mission Directorate. NASA's four aeronautics research centers - Armstrong, Ames Research Center, Langley Research Center, and Glenn Research Center - are part of the technology development project. With the use and diversity of unmanned aircraft growing rapidly, new uses for these vehicles are constantly being considered. Unmanned aircraft promise new ways of increasing efficiency, reducing costs, enhancing safety and saving lives 460265main_ED10-0132-16_full.jpg Unmanned aircraft systems such as NASA's Global Hawks (above) and Predator B named Ikhana (below), along with numerous other unmanned aircraft systems large and small, are the prime focus of the UAS in the NAS effort to integrate them into the national airspace. Credits: NASA Photos 710580main_ED07-0243-37_full.jpg The UAS in the NAS project envisions performance-based routine access to all segments of the national airspace for all unmanned aircraft system classes, once all safety-related and technical barriers are overcome. The project will provide critical data to such key stakeholders and customers as the Federal Aviation Administration and RTCA Special Committee 203 (formerly the Radio Technical Commission for Aeronautics) by conducting integrated, relevant system-level tests to adequately address

  14. The SKI SITE-94 Project: An International Peer Review Carried out by an OECD/NEA Team of Experts

    International Nuclear Information System (INIS)

    Sagar, Budhi; Devillers, C.; Smith, Paul; Laliuex, P.; Pescatore, C.

    1997-10-01

    The recently completed SITE-94 project is an SKI effort directed at building competence and capacity in the assessment of safety of a spent-fuel geologic repository. Emphasis is given to the assimilation of site-specific data, with its associated uncertainties, into the performance assessment. Specific attention is also given to improving the understanding of mechanisms that might compromise canister integrity. This report represents the common views of an International Review Team (IRT) established by the NEA Secretariat, at the request of SKI, to perform a peer review of SITE-94. The basis for the report is the understanding of SITE-94 and its background obtained by IRT in the course of several months of study of SITE-94 documentation, internal discussions and a meeting with SKI in Stockholm. The report is limited to the main findings of IRT. The intended audience of the report is the staff of SKI and, accordingly, the style of the report is suited to a technical audience familiar with the contents of the SITE-94 project

  15. Early hydrogen water chemistry project review, improvement opportunities and conceptural design options at Exelon boiling water reactors

    International Nuclear Information System (INIS)

    Garcia, Susan E.; Odell, Andrew D.; Giannelli, Joseph F.

    2012-09-01

    Intergranular Stress Corrosion Cracking (IGSCC) and its impacts have been a major concern to the BWR fleet since the mid-70's. Several alternative strategies have been employed to reduce the negative impacts, however, the newest being Early Hydrogen Water Chemistry (EHWC). The Electric Power Research Institute (EPRI) and the BWRVIP (Vessel Internals Project) has strongly supported the development of EHWC, including laboratory testing and a demonstration program that was performed at Peach Bottom Atomic Power Station in October 2011. This paper will review the impacts of a 'Special Test Program' on a BWR plant including: Project management findings; technical reviews and documents required to support such a demonstration program; temporary equipment design, installation and testing; keeping the demonstration progressing along with the plant return from a refuel outage; and lessons learned that can be applied to EHWC implementation during future start-ups. Details will be compared between various Exelon BWRs in support of conceptual designs for EHWC systems and operation. Some comparisons on operational impacts will be provided between various types of BWR plants with differing 'Balance of Plant' designs. (authors)

  16. The impact on healthcare, policy and practice from 36 multi-project research programmes: findings from two reviews.

    Science.gov (United States)

    Hanney, Steve; Greenhalgh, Trisha; Blatch-Jones, Amanda; Glover, Matthew; Raftery, James

    2017-03-28

    We sought to analyse the impacts found, and the methods used, in a series of assessments of programmes and portfolios of health research consisting of multiple projects. We analysed a sample of 36 impact studies of multi-project research programmes, selected from a wider sample of impact studies included in two narrative systematic reviews published in 2007 and 2016. We included impact studies in which the individual projects in a programme had been assessed for wider impact, especially on policy or practice, and where findings had been described in such a way that allowed them to be collated and compared. Included programmes were highly diverse in terms of location (11 different countries plus two multi-country ones), number of component projects (8 to 178), nature of the programme, research field, mode of funding, time between completion and impact assessment, methods used to assess impact, and level of impact identified. Thirty-one studies reported on policy impact, 17 on clinician behaviour or informing clinical practice, three on a combined category such as policy and clinician impact, and 12 on wider elements of impact (health gain, patient benefit, improved care or other benefits to the healthcare system). In those multi-programme projects that assessed the respective categories, the percentage of projects that reported some impact was policy 35% (range 5-100%), practice 32% (10-69%), combined category 64% (60-67%), and health gain/health services 27% (6-48%). Variations in levels of impact achieved partly reflected differences in the types of programme, levels of collaboration with users, and methods and timing of impact assessment. Most commonly, principal investigators were surveyed; some studies involved desk research and some interviews with investigators and/or stakeholders. Most studies used a conceptual framework such as the Payback Framework. One study attempted to assess the monetary value of a research programme's health gain. The widespread

  17. A Review of the American Recovery and Reinvestment Act Smart Grid Projects and Their Implications for China

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Xu [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Marnay, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Feng, Wei [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Zhou, Nan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Karali, Nihan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2017-06-21

    The Chinese government has paid growing attention to renewable energy development and has set ambitious goals for carbon dioxide (CO2) emissions reduction and energy savings. Smart grid (SG) technologies have been regarded as emerging ways to integrate renewable energy and to help achieve these climate and energy goals. This report first reviews completed SG demonstrations under the U.S. American Recovery and Reinvestment Act (ARRA); especially two key programs: the SG Investment Grant (SGIG) and the SG Demonstration Project (SGDP). Under the SGIG, the larger of the two programs, over $3.4 billion was used to help industry deploy existing advanced SG technologies and tools to improve grid performance and reduce costs. Including industry investment, a total of $8 billion was spent on 99 cost-shared projects, which involved more than 200 participating electric utilities and other organizations. These projects aimed to modernize the electric grid, strengthen cyber security, improve interoperability, and collect comprehensive data on SG operations and benefits.

  18. Peer review of the Three Mile Island Unit 2 Vessel Investigation Project metallurgical examinations

    Energy Technology Data Exchange (ETDEWEB)

    Bohl, R.W.; Gaydos, R.G.; Vander Voort, G.F.; Diercks, D.R. [Argonne National Lab., IL (United States)

    1994-07-01

    Fifteen samples recovered from the lower head of the Three Mile Island (TMI) Unit 2 nuclear reactor pressure vessel were subjected to detailed metallurgical examinations by the Idaho National Engineering Laboratory (INEL), with supporting work carried out by Argonne National Laboratory (ANL) and several of the European participants. These examinations determined that a portion of the lower head, a so-called elliptical ``hot spot`` measuring {approx}0.8 {times} 1 m, reached temperatures as high as 1100{degrees}C during the accident and cooled from these temperatures at {approx}10--100{degrees}C/min. The remainder of the lower head was found to have remained below the ferrite-toaustenite transformation temperature of 727{degrees}C during the accident. Because of the significance of these results and their importance to the overall analysis of the TMI accident, a panel of three outside peer reviewers, Dr. Robert W. Bohl, Mr. Richard G. Gaydos, and Mr. George F. Vander Voort, was formed to conduct an independent review of the metallurgical analyses. After a thorough review of the previous analyses and examination of photo-micrographs and actual lower head specimens, the panel determined that the conclusions resulting from the INEL study were fundamentally correct. In particular, the panel reaffirmed that four lower head samples attained temperatures as high as 1100{degrees}C, and perhaps as high as 1150--1200{degrees}C in one case, during the accident. They concluded that these samples subsequently cooled at a rate of {approx}50--125{degrees}C/min in the temperature range of 600--400{degrees}C, in good agreement with the original analysis. The reviewers also agreed that the remainder of the lower head samples had not exceeded the ferrite-to-austenite transformation temperature during the accident and suggested several refinements and alternative procedures that could have been employed in the original analysis.

  19. Review of Invasive Riparian Trees that Impact USACE Ecosystem Restoration Projects

    Science.gov (United States)

    2016-08-01

    often release seeds in periods of stress , including periods when exposed to herbicides or mechanical disturbances. Such characteristics make this...Approved for public release ; distribution is unlimited. ERDC TN-EMRRP-SI-36 August 2016 Review of Invasive Riparian Trees that Impact USACE...various spatial control methods for woody invasive plant removal in densely vegetated riparian habitats. The USACE ecosystem restoration mission has

  20. Compendium 0f Dental Residents’ Research Projects and Literature Reviews

    Science.gov (United States)

    1989-05-01

    maxilla and two flame- sprayed titanium IMZ implants were placed in the mandible. Sixteen weeks after placement, the implants were exposed and loaded...bipolar surface electrodes in a counter- balanced order. The interrater reliability for latency measurements was determined with a paired t-test...of citric acid against anaerobes. (Literature Review) (1986). NEUROSCIENCE/TMJ Ditcharo WH, Miears JR. Transcutaneous electrical nerve stimulation

  1. Peer review of the Three Mile Island Unit 2 Vessel Investigation Project metallurgical examinations

    International Nuclear Information System (INIS)

    Bohl, R.W.; Gaydos, R.G.; Vander Voort, G.F.; Diercks, D.R.

    1994-07-01

    Fifteen samples recovered from the lower head of the Three Mile Island (TMI) Unit 2 nuclear reactor pressure vessel were subjected to detailed metallurgical examinations by the Idaho National Engineering Laboratory (INEL), with supporting work carried out by Argonne National Laboratory (ANL) and several of the European participants. These examinations determined that a portion of the lower head, a so-called elliptical ''hot spot'' measuring ∼0.8 x 1 m, reached temperatures as high as 1100 degrees C during the accident and cooled from these temperatures at ∼10--100 degrees C/min. The remainder of the lower head was found to have remained below the ferrite-toaustenite transformation temperature of 727 degrees C during the accident. Because of the significance of these results and their importance to the overall analysis of the TMI accident, a panel of three outside peer reviewers, Dr. Robert W. Bohl, Mr. Richard G. Gaydos, and Mr. George F. Vander Voort, was formed to conduct an independent review of the metallurgical analyses. After a thorough review of the previous analyses and examination of photo-micrographs and actual lower head specimens, the panel determined that the conclusions resulting from the INEL study were fundamentally correct. In particular, the panel reaffirmed that four lower head samples attained temperatures as high as 1100 degrees C, and perhaps as high as 1150--1200 degrees C in one case, during the accident. They concluded that these samples subsequently cooled at a rate of ∼50--125 degrees C/min in the temperature range of 600--400 degrees C, in good agreement with the original analysis. The reviewers also agreed that the remainder of the lower head samples had not exceeded the ferrite-to-austenite transformation temperature during the accident and suggested several refinements and alternative procedures that could have been employed in the original analysis

  2. Evaluation of smartphone-based interaction techniques in a CAVE in the context of immersive digital project review

    Science.gov (United States)

    George, Paul; Kemeny, Andras; Colombet, Florent; Merienne, Frédéric; Chardonnet, Jean-Rémy; Thouvenin, Indira Mouttapa

    2014-02-01

    Immersive digital project reviews consist in using virtual reality (VR) as a tool for discussion between various stakeholders of a project. In the automotive industry, the digital car prototype model is the common thread that binds them. It is used during immersive digital project reviews between designers, engineers, ergonomists, etc. The digital mockup is also used to assess future car architecture, habitability or perceived quality requirements with the aim to reduce using physical mockups for optimized cost, delay and quality efficiency. Among the difficulties identified by the users, handling the mockup is a major one. Inspired by current uses of nomad devices (multi-touch gestures, IPhone UI look'n'feel and AR applications), we designed a navigation technique taking advantage of these popular input devices: Space scrolling allows moving around the mockup. In this paper, we present the results of a study we conducted on the usability and acceptability of the proposed smartphone-based interaction metaphor compared to traditional technique and we provide indications of the most efficient choices for different use-cases accordingly. It was carried out in a traditional 4-sided CAVE and its purpose is to assess a chosen set of interaction techniques to be implemented in Renault's new 5-sides 4K x 4K wall high performance CAVE. The proposed new metaphor using nomad devices is well accepted by novice VR users and future implementation should allow an efficient industrial use. Their use is an easy and user friendly alternative of the existing traditional control devices such as a joystick.

  3. State of Nevada review of Phase 1 of the INTRAVAL Project

    International Nuclear Information System (INIS)

    Lehman, L.

    1992-08-01

    The INTRAVAL Project which started in October, 1987, was designed to be an international cooperation project and is managed by the Swedish Nuclear Power Inspectorate. The project was to undertake the issue of what constitutes a validated model in terms of repository performance assessment. The US Nuclear Regulatory Commission (NRC) in 10CFR60.21 requires an explanation of measures used to support the models utilized in the assessment of performance which are included in the License Application. The NRC Nureg 0856, ''Final Technical Position on Documentation of Computer Codes for High Level Waste Management'' defines the term validation to be, ''assurance that a model as embodied in a computer code is a correct representation of the process or system for which it is intended. The notion of validating that a code accurately represents the operational physical processes at a given site has turned out to be a very difficult endeavor. Especially for sites such as Yucca Mountain where the flow regime is poorly known. There is currently no mathematical description of unsaturated flow in fractured -- porous media which the majority of the scientific community can support with confidence. Further, all overall performance calculations performed to date by the US DOE assume one dimensional porous flow which enters through the top of Yucca Mountain and makes it way to and through the repository. Not surprisingly these types of calculations lead to the conclusion that little or no release is possible via the groundwater pathway. Quite naturally, the State of Nevada is concerned with these types of calculations, preferring to see something more realistic in terms of conceptual models, fracture pathways, and releases. This concern is carried into the INTRAVAL process because if the DOE is to validate a model of flow at Yucca Mountain within INTRAVAL, the model must be realistic

  4. A review of drilled shaft sealing for the Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    1981-01-01

    Questions have been raised concerning the ability of the drillers of the exploratory shaft for the Basalt Waste Isolation program to develop an effective seal against water inflow down the annular space between the shaft casing and shaft wall into the mined chambers. We understand the need for shaft integrity and the concern of those responsible for the shaft planning. The purpose of this report is to give documentation to allay the fears of those who may have questions remaining in their minds concerning the prospects for a dry shaft. Included in this report are discussions of five projects where shaft sealing was effective in drilled shafts and one project where the material which is recommended for the exploratory shaft was used effectively in a conventional shaft. Also discussed is the recommended multitier approach toward shaft sealing which will, if adopted, use all of the current state of the art techniques to assure the watertightness of the shaft. It should be pointed out that none of the projects described here used all of the safeguards which are recommended in this program. If any of the materials and procedures recommended here are omitted, then of course the possibility increases for water migration through the casing-borehole annulus. It is our considered opinion that if the program recommended is adopted there will be no water inflow into the shaft, but if we are wrong or if, through human error, the program is not executed correctly, that we have devices and procedures available to us which will facilitate remedial work to perfect seal in the shaft. 4 refs., 3 figs., 1 tab

  5. A Project Journal Book Review of for One More Day Written by Mitch Albom

    OpenAIRE

    Fauzan, Riski

    2017-01-01

    This project focuses on the novel For One More Day. The purpose of this study is to find the strengths and the weaknesses of the novel. The writer uses close reading method to analyze the novel and collect the data. The strengths of the novel are found the characters and the themes of the novel. Meanwhile, the weaknesses are found by comparing the novel For One More Day to the novel The Five People You Meet in Heaven. Both of the books are written by the same author, Mitch Albom. The result o...

  6. SY-101 Rapid Transfer Project Low Temperature Operations Review and Recommendations to Support Lower Temperature Limits

    International Nuclear Information System (INIS)

    HICKMAN, G.L.

    2000-01-01

    The lower temperature limit for the 241 SY-101 RAPID transfer project is currently set at 20 F Based on the analysis and recommendations in this document this limit can be lowered to 0 F. Analysis of all structures systems and components (SSCs) indicate that a reduction in operating temperature may be achieved with minor modifications to field-installed equipment. Following implementation of these changes it is recommended that the system requirements be amended to specify a temperature range for transfer or back dilute evolutions of 0 F to 100 F

  7. Review and Necessity of Recognizing Risk Management in Civil Projects and Contracts

    OpenAIRE

    VOSOUGHI, Pouyan; VOSOUGHI, Vandad

    2015-01-01

    Proper risk management is the reason for which risk (and its various types) is assigned to that section that is able to manage it in the best way but is the section which is able to manage the risk in the best way the same party that has the most effect on the probability of an adverse occurrence or is the section that is able to manage the results in the best way after the adverse occurrence. Now by considering the size, nature and complexity of the projects, the necessity of having the tech...

  8. Improving evidence based practice in postgraduate nursing programs: A systematic review: Bridging the evidence practice gap (BRIDGE project).

    Science.gov (United States)

    Hickman, Louise D; DiGiacomo, Michelle; Phillips, Jane; Rao, Angela; Newton, Phillip J; Jackson, Debra; Ferguson, Caleb

    2018-04-01

    The nursing profession has a significant evidence to practice gap in an increasingly complex and dynamic health care environment. To evaluate effectiveness of teaching and learning strategies related to a capstone project within a Masters of Nursing program that encourage the development of evidence based practice capabilities. Systematic review that conforms to the PRISMA statement. Master's Nursing programs that include elements of a capstone project within a university setting. MEDLINE, CINAHL, Cochrane Database of Systematic Reviews, ERIC and PsycInfo were used to search for RCT's or quasi experimental studies conducted between 1979 and 9 June 2017, published in a peer reviewed journal in English. Of 1592 studies, no RCT's specifically addressed the development of evidence based practice capabilities within the university teaching environment. Five quasi-experimental studies integrated blended learning, guided design processes, small group work, role play and structured debate into Masters of Nursing research courses. All five studies demonstrated some improvements in evidence based practice skills and/or research knowledge translation, with three out of five studies demonstrating significant improvements. There is a paucity of empirical evidence supporting the best strategies to use in developing evidence based practice skills and/or research knowledge translation skills for Master's Nursing students. As a profession, nursing requires methodologically robust studies that are discipline specific to identify the best approaches for developing evidence-based practice skills and/or research knowledge translation skills within the university teaching environment. Provision of these strategies will enable the nursing profession to integrate the best empirical evidence into nursing practice. Copyright © 2018. Published by Elsevier Ltd.

  9. Out of the frying pan? Streamlining the ethics review process of multisite qualitative research projects.

    Science.gov (United States)

    Iedema, Rick A M; Allen, Suellen; Britton, Kate; Hor, Suyin

    2013-05-01

    This paper describes the ethics approval processes for two multicentre, nationwide, qualitative health service research projects. The paper explains that the advent of the National Ethics Application Form has brought many improvements, but that attendant processes put in place at local health network and Human Research Ethics Committee levels may have become significantly more complicated, particularly for innovative qualitative research projects. The paper raises several questions based on its analysis of ethics application processes currently in place. WHAT IS KNOWN ABOUT THE TOPIC? The complexity of multicentre research ethics applications for research in health services has been addressed by the introduction of the National Ethics Application Form. Uptake of the form across the country's human research ethics committees has been uneven. WHAT DOES THIS PAPER ADD? This paper adds detailed insight into the ethics application process as it is currently enacted across the country. The paper details this process with reference to difficulties faced by multisite and qualitative studies in negotiating access to research sites, ethics committees' relative unfamiliarity with qualitative research , and apparent tensions between harmonisation and local sites' autonomy in approving research. WHAT ARE THE IMPLICATIONS FOR PRACTITIONERS? Practitioners aiming to engage in research need to be aware that ethics approval takes place in an uneven procedural landscape, made up of variable levels of ethics approval harmonization and intricate governance or site-specific assessment processes.

  10. Review of nuclear new build in relation to project structure, supply chain and financing - 15106

    International Nuclear Information System (INIS)

    Keppler, J.H.; Cometto, M.

    2015-01-01

    The construction of a new nuclear power plant is a major industrial project involving a number of complex economic, technical and regulatory challenges. This article focuses on 2 of the most important among them: first, sustainable financing which is primarily a function of interest rates and the stability of electricity prices and secondly, the management of a complex construction process and its supply chain. The analysis shows the much stronger dependence of nuclear energy on the stability of electricity prices when compared with a gas plant of the same size. Nevertheless the study underlines that at debt ratios below 60%, the risk for a debt-investor in a nuclear project is rather limited even for large electricity and permanent price fall. There exist a wide spectrum of different options for sharing the responsibilities between the ultimate operators of a nuclear power plant and the principal supplier. 3 main categories of contract are used for the construction of NPPs: the turnkey approach, the split-package approach and the multi-contract approach.In construction, where the emergence of a competitive, global supply chain is not yet ensured, the convergence of nuclear engineering codes and quality standards, as well as regulatory harmonisation remain a key step to promote both competition and public confidence

  11. Community Tenure Rights and REDD+: A Review of the Oddar Meanchey Community Forestry REDD+ Project in Cambodia

    Directory of Open Access Journals (Sweden)

    Donal Yeang

    2012-01-01

    Full Text Available Tenure rights over land, forest, and carbon have become a contentious issue within REDD+ implementation across the tropics because local communities could be excluded from REDD+ benefits if land tenure or use and access rights are not clear. This study aims to understand and assess tenure arrangements under the first REDD+ demonstration project in Cambodia, the Oddar Meanchey Com- munity Forestry REDD+ Project. In particular, the study explores the following questions: (1 How are tenure rights arranged in the Oddar Meanchey REDD+ Project? (2 Does the tenure regime recognise the rights of local communities to their land and its associated resources? (3 What kind of institu- tions are put in place to support tenure rights of local communities in the project? The author conducted in-depth semi-structured interviews with key stakeholders and complemented the analysis by participant observation and a review of policy documents and secondary literature. The major finding of this study is that the local communities in the project are still given rights to use and access forest resources, although carbon rights belong to the government. While the government retains ownership over carbon credits, it agreed that at least 50 percent of the net revenue from the sale of carbon credits will flow to participating communities. ------ Besitzrechte an Land, Wald und CO2 sind zu einer umkämpften Angelegenheit in der REDD+ Implementierung in den Tropen geworden. Diese Studie versucht die Besitzregelungen im ersten REDD+ Demons- trationsprojekt in Kambodscha, dem Oddar Meanchey Community Forestry REDD+ Project, zu verstehen und zu bewerten. Die Untersuchung analysiert dabei insbesondere folgende Fragen: (1 Wie sind Besitzrechte im Oddar Meanchey REDD+ Projekt geregelt? (2 Erkennt das Besitzsystem die Rechte von lokalen Gemeinschaften an ihrem Land und den dazugehörigen Ressourcen an? (3 Welche Institutionen werden geschaffen, um die Besitzrechte von lokalen

  12. Hawaii energy strategy project 2: Fossil energy review. Task 1: World and regional fossil energy dynamics

    Energy Technology Data Exchange (ETDEWEB)

    Breazeale, K. [ed.; Isaak, D.T.; Yamaguchi, N.; Fridley, D.; Johnson, C.; Long, S.

    1993-12-01

    This report in the Hawaii Energy Strategy Project examines world and regional fossil energy dynamics. The topics of the report include fossil energy characteristics, the world oil industry including reserves, production, consumption, exporters, importers, refining, products and their uses, history and trends in the global oil market and the Asia-Pacific market; world gas industry including reserves, production, consumption, exporters, importers, processing, gas-based products, international gas market and the emerging Asia-Pacific gas market; the world coal industry including reserves, classification and quality, utilization, transportation, pricing, world coal market, Asia-Pacific coal outlook, trends in Europe and the Americas; and environmental trends affecting fossil fuels. 132 figs., 46 tabs.

  13. Review of selected 100-N waste sites related to N-Springs remediation projects

    International Nuclear Information System (INIS)

    DeFord, D.H.; Carpenter, R.W.

    1996-01-01

    This document has been prepared in support of the environmental restoration program at the US Department of Energy's Hanford Site near Richland, Washington, by the Bechtel Hanford, Inc. Facility and Waste Site Research Office. It provides historical information that documents and characterizes selected waste sites that are related to the N-Springs remediation projects. The N-Springs are a series of small, inconspicuous groundwater seepage springs located along the Columbia River shoreline near the 100-N Reactor. The spring site is hydrologically down-gradient from several 100-N Area liquid waste sites that are believed to have been the source(s) of the effluents being discharged by the springs. This report documents and characterizes these waste sites, including the 116-N-1 Crib and Trench, 116-N-3 Crib and Trench, unplanned releases, septic tariks, and a backwash pond

  14. Review of Halden Reactor Project high burnup fuel data that can be used in safety analyses

    International Nuclear Information System (INIS)

    Wiesenack, W.

    1996-01-01

    The fuels and materials testing programmes carried out at the OECD Halden Reactor Project are aimed at providing data in support of a mechanistic understanding of phenomena, especially as related to high burnup fuel. The investigations are focused on identifying long term property changes, and irradiation techniques and instrumentation have been developed over the years which enable to assess fuel behaviour and properties in-pile. The fuel-cladding gap has an influence on both thermal and mechanical behaviour. Improved gap conductance due to gap closure at high exposure is observed even in the case of a strong contamination with released fission gas. On the other hand, pellet-cladding mechanical interaction, which is measured with cladding elongation detectors and diameter gauges, is re-established after a phase with less interaction and is increasing. These developments are exemplified with data showing changes of fuel temperature, hydraulic diameter and cladding elongation with burnup. Fuel swelling and cladding primary and secondary creep have been successfully measured in-pile. They provide data for, e.g., the possible cladding lift-off to be accounted for at high burnup. Fuel conductivity degradation is observed as a gradual temperature increase with burnup. This affects stored heat, fission gas release and temperature dependent fuel behaviour in general. The Halden Project's data base on fission gas release shows that the phenomenon is associated with an accumulation of gas atoms at the grain boundaries to a critical concentration before appreciable release occurs. This is accompanied by an increase of the surface-to-volume ratio measured in-pile in gas flow experiments. A typical observation at high burnup is also that a burst release of fission gas may occur during a power decrease. Gas flow and pressure equilibration experiments have shown that axial communication is severely restricted at high burnup

  15. Anthropogenic radioactivity in the Arctic Ocean. Review of the results from the joint German project

    International Nuclear Information System (INIS)

    Nies, H.; Harms, I.H.; Karcher, M.J.; Dethleff, D.; Bahe, C.

    1999-01-01

    The paper presents the results of the joint project carried out in Germany in order to assess the consequences in the marine environment from the dumping of nuclear wastes in the Kara and Barents Seas. The project consisted of experimental work on measurements of radionuclides in samples from the Arctic marine environment and numerical modelling of the potential pathways and dispersion of contaminants in the Arctic Ocean. Water and sediment samples were collected for determination of radionuclide such as 137Cs, 90Sr, 239+240Pu, 238Pu, and 241Am and various organic micropollutants. In addition, a few water and numerous surface sediment samples collected in the Kara Sea and from the Kola peninsula were taken by Russian colleagues and analysed for artificial radionuclides by the BSH laboratory. The role of transport by sea ice from the Kara Sea into the Arctic Ocean was assessed by a small subgroup at GEOMAR. This transport process might be considered as a rapid contribution due to entrainment of contaminated sediments into sea ice, following export from the Kara Sea into the transpolar ice drift and subsequent release in the Atlantic Ocean in the area of the East Greenland Current. Numerical modelling of dispersion of pollutants from the Kara and Barents Seas was carried out both on a local scale for the Barents and Kara Seas and for long range dispersion into the Arctic and Atlantic Oceans. Three-dimensional baroclinic circulation models were applied to trace the transport of pollutants. Experimental results were used to validate the model results such as the discharges from the nuclear reprocessing plant at Sellafield and subsequent contamination of the North Sea up the Arctic Seas

  16. Anthropogenic radioactivity in the Arctic Ocean--review of the results from the joint German project.

    Science.gov (United States)

    Nies, H; Harms, I H; Karcher, M J; Dethleff, D; Bahe, C

    1999-09-30

    The paper presents the results of the joint project carried out in Germany in order to assess the consequences in the marine environment from the dumping of nuclear wastes in the Kara and Barents Seas. The project consisted of experimental work on measurements of radionuclides in samples from the Arctic marine environment and numerical modelling of the potential pathways and dispersion of contaminants in the Arctic Ocean. Water and sediment samples were collected for determination of radionuclide such as 137Cs, 90Sr, 239 + 240Pu, 238Pu, and 241Am and various organic micropollutants. In addition, a few water and numerous surface sediment samples collected in the Kara Sea and from the Kola peninsula were taken by Russian colleagues and analysed for artificial radionuclide by the BSH laboratory. The role of transport by sea ice from the Kara Sea into the Arctic Ocean was assessed by a small subgroup at GEOMAR. This transport process might be considered as a rapid contribution due to entrainment of contaminated sediments into sea ice, following export from the Kara Sea into the transpolar ice drift and subsequent release in the Atlantic Ocean in the area of the East Greenland Current. Numerical modelling of dispersion of pollutants from the Kara and Barents Seas was carried out both on a local scale for the Barents and Kara Seas and for long range dispersion into the Arctic and Atlantic Oceans. Three-dimensional baroclinic circulation models were applied to trace the transport of pollutants. Experimental results were used to validate the model results such as the discharges from the nuclear reprocessing plant at Sellafield and subsequent contamination of the North Sea up the Arctic Seas.

  17. Supporting the Creation and Publication of Reviewed and Tested Teaching Modules through the InTeGrate Project

    Science.gov (United States)

    Bruckner, M. Z.; Birnbaum, S. J.; Bralower, T. J.; Egger, A. E.; Fox, S.; Gosselin, D. C.; Iverson, E. A. R.; Manduca, C. A.; Mcconnell, D. A.; Steer, D. N.; Taber, J. J.

    2016-12-01

    InTeGrate is dedicated to providing robust curricular materials that increase Earth literacy among undergraduate students. As of August 2016, 14 modules that use an interdisciplinary approach to teach about Earth-related sustainability issues across the curriculum have been published, and 19 courses and modules are undergoing final revisions. Materials are designed for undergraduate courses and have been tested in a variety of disciplines including geoscience, engineering, humanities, ethics, and Spanish language courses. The materials were developed, tested, revised, and reviewed using a two-year, highly scaffolded process that involves meeting a series of checkpoints, and is supported by a team of experts who provide guidance and formative feedback throughout the process. A series of webinars also supported teams in the development process. Author teams comprise 3-6 faculty members from at least three different institutions. Authors work collaboratively in a templated webspace designed specifically for creating materials, and representatives from the InTeGrate leadership, assessment, and web teams support each group of authors. This support team provides guidance and feedback on content, pedagogy, and web layout as authors develop materials. Authors attend two face-to-face meetings, one at the beginning of the process and another after materials are piloted in authors' classes. These meetings serve to initially orient authors to the development process, including the rubric that will guide their work, and in making revisions following the piloting phase of the project. Authors report that the meetings also provide professional development experience wherein they learn about pedagogy from each other and team leaders. The bulk of the materials development occurs remotely, with teams meeting regularly via teleconference as they follow the project timeline. All materials undergo review against the Materials Design and Refinement Rubric to ensure they meet project

  18. Yucca Mountain Project: ESF Title I design control process review report

    International Nuclear Information System (INIS)

    1989-01-01

    The Exploratory Shaft Facility (ESF) Title 1 Design Control Process Review was initiated in response to direction from the Office of Civilian Radioactive Waste Management (OCRWM) (letter: Kale to Gertz, NRC Concerns on Title 1 Design Control Process, November 17, 1988). The direction was to identify the existing documentation that described ''hor-ellipsis the design control process and the quality assurance that governed hor-ellipsis'' (a) the development of the requirements documents for the ESF design, (b) the various interfaces between activities, (c) analyses and definitions leading to additional requirements in the System Design Requirements Documents and, (d) completion of Title 1 Design. This report provides historical information for general use in determining the extent of the quality assurance program in existence during the ESF Title 1 Design

  19. A literature review for large-scale health information system project planning, implementation and evaluation.

    Science.gov (United States)

    Sligo, Judith; Gauld, Robin; Roberts, Vaughan; Villa, Luis

    2017-01-01

    Information technology is perceived as a potential panacea for healthcare organisations to manage pressure to improve services in the face of increased demand. However, the implementation and evaluation of health information systems (HIS) is plagued with problems and implementation shortcomings and failures are rife. HIS implementation is complex and relies on organisational, structural, technological, and human factors to be successful. It also requires reflective, nuanced, multidimensional evaluation to provide ongoing feedback to ensure success. This article provides a comprehensive review of the literature about evaluating and implementing HIS, detailing the challenges and recommendations for both evaluators and healthcare organisations. The factors that inhibit or promote successful HIS implementation are identified and effective evaluation strategies are described with the goal of informing teams evaluating complex HIS. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  20. A scoping review of online repositories of quality improvement projects, interventions and initiatives in healthcare.

    Science.gov (United States)

    Bytautas, Jessica P; Gheihman, Galina; Dobrow, Mark J

    2017-04-01

    Quality improvement (QI) is becoming an important focal point for health systems. There is increasing interest among health system stakeholders to learn from and share experiences on the use of QI methods and approaches in their work. Yet there are few easily accessible, online repositories dedicated to documenting QI activity. We conducted a scoping review of publicly available, web-based QI repositories to (i) identify current approaches to sharing information on QI practices; (ii) categorise these approaches based on hosting, scope and size, content acquisition and eligibility, content format and search, and evaluation and engagement characteristics; and (iii) review evaluations of the design, usefulness and impact of their online QI practice repositories. The search strategy consisted of traditional database and grey literature searches, as well as expert consultation, with the ultimate aim of identifying and describing QI repositories of practices undertaken in a healthcare context. We identified 13 QI repositories and found substantial variation across the five categories. The QI repositories used different terminology (eg, practices vs case studies) and approaches to content acquisition, and varied in terms of primary areas of focus. All provided some means for organising content according to categories or themes and most provided at least rudimentary keyword search functionality. Notably, none of the QI repositories included evaluations of their impact. With growing interest in sharing and spreading best practices and increasing reliance on QI as a key contributor to health system performance, the role of QI repositories is likely to expand. Designing future QI repositories based on knowledge of the range and type of features available is an important starting point for improving their usefulness and impact. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  1. A review of overseas financing mechanisms and incentives for commercial renewable energy projects. V. 2: Case study countries

    International Nuclear Information System (INIS)

    1996-01-01

    This second volume of a major study conducted for the United Kingdom Department of Trade and Industry aims to review financing mechanisms and incentives for the commercialisation of renewable energy projects. The countries included in this volume present case studies from countries identified as having particularly interesting current or past policies for the development and commercialisation of renewable energy technologies, namely Austria, Denmark, Germany, Greece, India, The Netherlands, Spain and two states in the United States of America. Data is presented on key facts, energy issues and organizations as well as energy and environmental policy for each country. The electricity supply industry, possibilities for renewable energy development, and incentive mechanisms in appropriate areas for development are also described for each country. (UK)

  2. Review of Research Projects on Qualitative and Quantitative Effects of Radiation on Haematopoietic Tissue in Man and Experimental Animal

    Energy Technology Data Exchange (ETDEWEB)

    Hilberg, A. W. [Division of Radiological Health, Department of Health, Education and Welfare, Rockville, MD (United States)

    1967-07-15

    By way of introduction to a review of Research Projects of the Division of Radiological Health concerned with effects of radiation on the haematopoietic tissue in man and the experimental animal, I should like first to discuss briefly the organization of research. Our research is organized into three major disciplines: (1) Epidemiology, (2) Radiation biology, and (3) Environmental sciences. Briefly, epidemiology is concerned with studies, of populations and effects of radiation in.man; radiation biology is concerned with effects in the experimental animal under controlled situations and also concerned with basic research in cellular and sub-cellular effects; and environmental science is concerned with transport mechanisms in the biosphere and how these mechanisms may operate and be interrupted to reduce radiation hazard to man.

  3. Hawaii energy strategy project 2: Fossil energy review. Task 3 -- Greenfield options: Prospects for LNG use

    Energy Technology Data Exchange (ETDEWEB)

    Breazeale, K. [ed.; Fesharaki, F.; Fridley, D.; Pezeshki, S.; Wu, K.

    1993-12-01

    This paper begins with an overview of the Asia-Pacific LNG market, its major players, and the likely availability of LNG supplies in the region. The discussion then examines the possibilities for the economic supply of LNG to Hawaii, the potential Hawaiian market, and the viability of an LNG project on Oahu. This survey is far from a complete technical assessment or an actual engineering/feasibility study. The economics alone cannot justify LNG`s introduction. The debate may continue as to whether fuel diversification and environmental reasons can outweigh the higher costs. Several points are made. LNG is not a spot commodity. Switching to LNG in Hawaii would require a massive, long-term commitment and substantial investments. LNG supplies are growing very tight in the Asia-Pacific region. Some of the environmental benefits of LNG are not entirely relevant in Hawaii because Hawaii`s air quality is generally excellent. Any air quality benefits may be more than counterbalanced by the environmental hazards connected with large-scale coastal zone construction, and by the safety hazards of LNG carriers, pipelines, etc. Lastly, LNG is not suitable for all energy uses, and is likely to be entirely unsuitable for neighbor island energy needs.

  4. LIEKKI 2 - Annual Review 1996. Project reports; LIEKKI 2 - Vuosikirja 1996. Projektiraportit

    Energy Technology Data Exchange (ETDEWEB)

    Hupa, M.; Matinlinna, J. [eds.

    1996-12-01

    The LIEKKI 2 program is planned to cover the research work to be performed in the period beginning in 1993 and ending in 1998. LIEKKI 2 is largely a continuation of the combustion and gasification research earlier included in the national research programmes LIEKKI and JALO. The research within the scope of the LIEKKI 2 research programme is aimed at supporting the development of energy conversion techniques relating to combustion and gasification in Finland. Research serving the development of new, more efficient and environmentally sound techniques will receive special attention, but research developing conventional combustion techniques is also to be included in the programme. Another important objective of the programme is to maintain and develop the competence of different research groups in this field of technology on a long term basis. The first part of the yearbook contains results and descriptions of the projects in the following research areas: (1) Modelling of the furnace processes, (2) the chemistry of gaseous emission components, (3) ash, aerosols and the behaviour of particles

  5. LIEKKI 2 - Annual Review 1996. Project reports; LIEKKI 2 - Vuosikirja 1996. Projektiraportit

    Energy Technology Data Exchange (ETDEWEB)

    Hupa, M.; Matinlinna, J. [eds.

    1996-12-01

    The LIEKKI 2 program is planned to cover the research work to be performed in the period beginning in 1993 and ending in 1998. LIEKKI 2 is largely a continuation of the combustion and gasification research earlier included in the national research programmes LIEKKI and JALO. The research within the scope of the LIEKKI 2 research programme is aimed at supporting the development of energy conversion techniques relating to combustion and gasification in Finland. Research serving the development of new, more efficient and environmentally sound techniques will receive special attention, but research developing conventional combustion techniques is also to be included in the programme. Another important objective of the programme is to maintain and develop the competence of different research groups in this field of technology on a long term basis. The second part of the yearbook contains results and descriptions of the projects in the following research areas: (1) new combustion and gasification technologies, (2) black liquor, (3) conventional combustion technologies and waste incineration

  6. A review of the IEA/NEA Projected Costs of Electricity – 2015 edition

    International Nuclear Information System (INIS)

    Khatib, Hisham

    2016-01-01

    The IEA/NEA recently issued their eighth edition of the Study on the “Projected Costs of Generating Electricity” – 2015 edition. The Study is mainly concerned with calculating the levelised cost of electricity (LCOE). The LCOE calculations are based on a levelised average life time cost approach using the discounted cash flow (DCF) method. The analysis was this year, and for the first time, performed using three discount rates (3%, 7%, and 10%). The LCOE can serve as a tool for calculating the cost of different generation technologies. However the Study's usefulness is affected by its narrow base of a limited set of countries that are not necessarily representative. It ignored the negative role of subsidies and did not provide a methodology for selective application of the discount rates and costing of carbon. The global power generation scene is changing. Generation growth in OECD countries has become very limited; simultaneously there is rapid growth of varying renewables (VRE) generation which needs special criteria for assessing its system cost. All this demands a rethinking of the application and usefulness of the LCOE in future generation planning. - Highlights: • LCOE is a useful tool for economics of generation technologies. • The IEA/NEA study did not cover fully the required criteria for assessment. • It ignored interpretation of: the discount rate, carbon costing and subsidies. • The world energy scene is changing, this requires reassessment of LCOE.

  7. Model projections and policy reviews for energy saving in China's service sector

    International Nuclear Information System (INIS)

    Zhang, Lin

    2013-01-01

    Energy efficiency of buildings in the service sector is becoming increasingly important in China due to the structural shift of the economy from industry to services. This paper employs a bottom-up cohort model to simulate current energy saving policies and to make projections for future energy use and CO 2 emissions for the period 2000–2030 in the Chinese service sector. The analysis shows that energy demand in the service sector will approximately triple in 2030, far beyond the target of quadrupling GDP while only doubling energy use. However, it is feasible to achieve the target of emission reduction by 40% in 2020 even under the poor state of compliance rate of building standard. This paper also highlights four crucial aspects of designing optimal energy saving policies for China's service sector based on the model results. - Highlights: • Government energy saving target cannot realize with current policies in services. • Energy savings policies for new buildings are crucial than building retrofitting. • Cooling energy use increases significantly to reach equal weight as heating. • CO 2 tax can contribute to change in fuel mix, and thus emission reductions. • Low compliance rate limits further energy saving, hence green fund is required

  8. Cervical enamel projections in unusual locations: a case report and mini-review.

    Science.gov (United States)

    Chan, Hsun-Liang; Oh, Tae-Ju; Bashutski, Jill; Fu, Jia-Hui; Wang, Hom-Lay

    2010-05-01

    Periodontitis is primarily a bacteria-induced disease that can be modified by tooth-related local factors. Cervical enamel projections (CEPs) are a common tooth anomaly that can act as contributing factors in the development of periodontitis. They are most commonly found at the buccal surfaces of mandibular molars. A 57-year-old female was referred to our clinic for treatment of chronic periodontitis. A clinical examination revealed moderate attachment loss that was localized to the palatal side of the maxillary second molars. The rest of the dentition was less affected, with a diagnosis of generalized slight chronic periodontitis. An initial non-surgical periodontal treatment was provided followed by apically positioned flap surgery in the maxillary right and left posterior areas. At the time of surgery, CEPs were found where the periodontium was most affected. Because surgical intervention exposed the CEPs, they were not removed. After the active therapy, which resulted in inflammation resolution and maintainable probing depths, the patient was placed on a 3-month recall for periodontal maintenance. CEPs were found in an unusual location on the palatal roots of maxillary second molars. The findings of this case report confirm the role of CEPs as a local contributing factor in localized chronic periodontitis.

  9. Government programs for climate change mitigation in Japan. An analysis based on public budget documents and Government Project Review Sheets

    International Nuclear Information System (INIS)

    Kimura, Osamu

    2016-01-01

    The Japanese government has been spending huge public budgets for various programs to mitigate climate change, such as subsidy programs for energy efficient and renewable technologies, and R and D programs to develop innovative low carbon technologies. This report makes a comprehensive review of government projects and expenditure related to climate change mitigation in order to grasp their total expenditure and to analyze portfolio of supported technology and activity types, outcome, and the cost-effectiveness. It is estimated that the total expenditure for climate change mitigation excluding nuclear energy and forest sink projects amounts to 4.8 trillion JPY (approximately 40 billion USD) in the period of 2008 to 2014. 40% of the total expenditure went to only three largest programs, namely the Eco Car Subsidy, the Eco Point Programs for Appliances and Houses, all of which have gone through virtually no or only poor evaluations by the implementing ministries. While some programs had decent cost-effectiveness of reducing carbon dioxide emission at below 10,000 JPY/t-CO 2 (approximately 90 USD), there are also programs with very low cost-effectiveness at more than 100,000 JPY/t-CO 2 . Moreover, all of the evaluation was based on 'gross' reduction, not on 'net' of freeriders, rebound and other factors, which may lead to overestimation of performances. The result shows the need for a much larger resource for evaluation activities by the government. (author)

  10. A review of planetary and space science projects presented at iCubeSat, the Interplanetary CubeSat Workshop

    Science.gov (United States)

    Johnson, Michael

    2015-04-01

    iCubeSat, the Interplanetary CubeSat Workshop, is an annual technical workshop for researchers working on an exciting new standardised platform and opportunity for planetary and space scientists. The first workshop was held in 2012 at MIT, 2013 at Cornell, 2014 at Caltech with the 2015 workshop scheduled to take place on the 26-27th May 2015 at Imperial College London. Mission concepts and flight projects presented since 2012 have included orbiters and landers targeting asteroids, the moon, Mars, Venus, Saturn and their satellites to perform science traditionally reserved for flagship missions at a fraction of their cost. Some of the first missions proposed are currently being readied for flight in Europe, taking advantage of multiple ride share launch opportunities and technology providers. A review of these and other interplanetary CubeSat projects will be presented, covering details of their science objectives, instrument capabilities, technology, team composition, budget, funding sources, and the other programattic elements required to implement this potentially revolutionary new class of mission.

  11. Converting an estuary to Lake Grevelingen: Environmental review of a coastal engineering project

    Science.gov (United States)

    Saeijs, H. L. F.; Stortelder, P. B. M.

    1982-09-01

    To guarantee protection from storm floods in the southwestern part of the Netherlands, the length of exposed coastline is being greatly reduced by the construction of dams and a storm surge barrier. As part of the Delta Project, the mouth of the Grevelingen estuary was closed in 1971. Due to the closure, tidal movement was eliminated, which resulted in changes in environmental factors such as transparency and chloride and phosphate concentration. The number of plant and animal groups decreased. Large areas of sand flats and salt marshes, which were formerly exposed to the tides, were left “high and dry.” This resulted in enormous changes for the communities living in these areas. The development of a new ecological system and the changed potential afforded by the water and land areas for human use, emphasized the need for physical planning. The potential uses (functions) of the new system are discussed in this article. Special attention is given to the demand for recreational facilities and nature conservation and to the balanced realization of these main functions. The methods applied in choosing between alternatives in physical planning are explained. Water quality and ecosystem management are discussed. One of the main management objectives is the prevention of a further decrease in the chloride concentration and the number of species. A sluice was, therefore, put into operation in 1978, by means of which water was exchanged between the North Sea and Lake Grevelingen. The responses observed are discussed here. In the near future, a crucial decision will have to be made: Will Lake Grevelingen remain a salt-water lake or will it become a fresh-water lake?

  12. Review of the White Rose Development Project : environmental impact statement with emphasis on concerns regarding marine birds

    International Nuclear Information System (INIS)

    Johnson, M.

    2001-07-01

    The Canadian Nature Federal (CNF) works in partnership with other environmental organizations, governments and industry to promote the development of ecologically sound solutions to conservation problems. This paper was prepared by the Important Bird Areas Program within the CNF and submitted to the Canada-Newfoundland Offshore Petroleum Board to make them aware of the threats that offshore oil and gas activity pose to marine birds. In particular, the CNF has taken the opportunity offered by the Public Review of Husky Oil's proposed White Rose Development Application. This submission is not intended as a comprehensive review of the development application, but rather to identify specific concerns regarding the impact the project will have on marine birds. Of the 43 coastal important bird areas that have been identified in Newfoundland, 6 are located within the White Rose Study Area. All of the bird species spend their time on the water and forage by diving into the water column. This makes them particularly vulnerable to oil or any other water pollution. The CNF is concerned about the effects that flaring operations, drill cuttings, and oil spills will have on the birds. Since there is no way to mitigate the effects of oil on seabirds, prevention is the only realistic approach to minimizing the effects on marine birds from offshore oil activity. 1 append

  13. Ballroom dancing as physical activity for patients with cancer: a systematic review and report of a pilot project.

    Science.gov (United States)

    Rudolph, Ivonne; Schmidt, Thorsten; Wozniak, Tobias; Kubin, Thomas; Ruetters, Dana; Huebner, Jutta

    2018-04-01

    Physical activity has positive effects on cancer patients. Dancing addresses diverse bio-psycho-social aspects. Our aim was to assess the evidence on ballroom dancing and to develop the setting for a pilot project. We performed a systematic review, extracted the data and designed a pilot training based on standard curricula. We included cancer patients during or after therapy. Training duration was 90 min with one regular pause and individual pauses as needed. We retrieved two systematic reviews and six controlled studies. Types of dancing varied. Only one study used ballroom dancing. Dance training might improve well-being, physical fitness, fatigue and coping during and after therapy. Yet, evidence is scarce and data to derive the effect size are lacking; 27 patients and their partners took part in the pilot training. Patients and partners needed more time to learn the steps than is planned in regular ballroom classes. Participants were very satisfied with the adaptation of the training to their physical strength and estimated the training in a sheltered group. No side effects occurred. In spite of a high rate of participants reporting fatigue, 90 min of physical activity with only a few minutes of rest were manageable for all participants. Ballroom dancing may offer benefits for patients with respect to quality of life. Cancer patients prefer sheltered training setting and curricula of regular ballroom classes must be adapted for cancer patients. Strict curricula might reduce motivation and adherence and exclude patients with lower or variable fitness.

  14. Social Licensing in uranium mining: Experiences from the IAEA review of the planned Mukju River Uranium Project, Tanzania

    International Nuclear Information System (INIS)

    Schnell, H.; Hilton, J.; Saint-Pierre, S.; Baldry, K.; Fan, Z.; Tulsidas, H.

    2014-01-01

    The IAEA Uranium Production Site Appraisal Team (UPSAT) programme is designed to assist Member States to enhance the operational performance and the occupational, public and environmental health and safety of uranium mining and processing facilities across all phases of the uranium production cycle. The scope of the appraisal process includes exploration, resource assessment, planning, environmental and social impact assessment, mining, processing, waste management, site management, remediation, and final closure. An UPSAT review was requested in 2010 by the United Republic of Tanzania (URT) to address the challenges the country is currently facing in developing its uranium mining and processing capability for the first time. The review that was carried out from 27 May to 5 June, 2013 had the objective to to appraise URT’s preparedness for overseeing the Uranium Production Cycle in general, at the same time focusing on the planned Mkuju River Project (MRP) in the south of the country in particular. The UPSAT team was tasked to report its findings according to five primary areas: 1. Regulatory system; 2. Sustainable uranium production life cycle; 3. Health, Safety and Environment (HSE); 4. Social licensing; 5. Capacity building. The paper will discuss the key findings and suggestions that were provided to governmental stakeholders and the operater to improve the planned operations. (author)

  15. Crystalline Repository Project: Review and comment of the Leech Lake Reservation Business Committee: Draft area recommendation report

    International Nuclear Information System (INIS)

    1986-09-01

    The Leech Lake Reservation Business Committee (LLRBC) has reviewed five documents related to the US Department of Energy's Crystalline Repository Project (CRP). They are the ''National Survey of Crystalline Rocks,'' ''General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories;' Final Siting Guidelines (10 CFR Part 960),'' ''Regional Characterization Reports for the North Central Region,'' the ''Region to Area Screening Methodology Document'' (SMD) and the ''Draft Area Recommendation Report'' (DARR). The comments and discussions of issues contained in this review will be considered in the preparation of the Final Area Recommendation Report, which will formally identify potentially acceptable sites for a second national repository for the permanent disposal of high level nuclear waste. Following a review of the above referenced documents, the LLRBC has concluded that the identification of potentially acceptable sites in the Draft Area Recommendation Report is based upon inferior and incomplete technical information being applied to a flawed screening process which, among other deficiencies, pays little attention to the importance of hydrological factors in the siting process. Although the DOE prefers that comments from states and tribes be directed at the Draft Area Recommendation Report alone, the Leech Lake Reservation Business Committee is extremely concerned about inadequacies in the ''National Survey of Crystalline Rocks'' (ORCD-1), which serves as the foundation for all siting work done to date. The national survey was conducted utilizing little of the time or staffing required for this important phase of the Crystalline Repository Program. As a result, the national survey is based upon out-of-date scientific literature, exaggerates certain screening variables that favor the selection of regions in the eastern US and arbitrarily eliminated the few western crystalline rock bodies that passed the questionable screening process utilized

  16. Independent Technical Review of the C-400 Interim Remedial Project Phase I Results, Paducah, Kentucky

    International Nuclear Information System (INIS)

    Looney, B.; Rossabi, J.; Stewart, L.; Richards, W.

    2010-01-01

    The groundwater and soil in the vicinity of the C-400 Building at the Paducah Gaseous Diffusion Plant (PGDP), is contaminated with substantial quantities of industrial solvents, primarily trichoroethene (TCE). This solvent 'source' is recognized as a significant challenge and an important remediation target in the overall environmental cleanup strategy for PGDP. Thus, the cleanup of the C-400 TCE Source is a principal focus for the Department of Energy (DOE) and its contractors, and for PGDP regulators and stakeholders. Using a formal investigation, feasibility study and decision process, Electrical Resistance Heating (ERH) was selected for the treatment of the soil and groundwater in the vicinity of C-400. ERH was selected as an interim action to remove 'a significant portion of the contaminant mass of TCE at the C-400 Cleaning Building area through treatment' with the longer term goal of reducing 'the period the TCE concentration in groundwater remains above its Maximum Contaminant Level (MCL).' ERH is a thermal treatment that enhances the removal of TCE and related solvents from soil and groundwater. The heterogeneous conditions at PGDP, particularly the high permeability regional gravel aquifer (RGA), are challenging to ERH. Thus, a phased approach is being followed to implement this relatively expensive and complex remediation technology. Conceptually, the phased approach encourages safety and efficiency by providing a 'lessons learned' process and allowing appropriate adjustments to be identified and implemented prior to follow-on phase(s) of treatment. More specifically, early deployment targeted portions of the challenging RGA treatment zone with relatively little contamination reducing the risk of adverse collateral impacts from underperformance in terms of heating and capture. Because of the importance and scope of the C-400 TCE source remediation activities, DOE chartered an Independent Technical Review (ITR) in 2007 to assess the C-400 ERH plans prior

  17. INDEPENDENT TECHNICAL REVIEW OF THE C-400 INTERIM REMEDIAL PROJECT PHASE I RESULTS, PADUCAH, KENTUCKY

    Energy Technology Data Exchange (ETDEWEB)

    Looney, B.; Rossabi, J.; Stewart,L.; Richards, W.

    2010-10-29

    The groundwater and soil in the vicinity of the C-400 Building at the Paducah Gaseous Diffusion Plant (PGDP), is contaminated with substantial quantities of industrial solvents, primarily trichoroethene (TCE). This solvent 'source' is recognized as a significant challenge and an important remediation target in the overall environmental cleanup strategy for PGDP. Thus, the cleanup of the C-400 TCE Source is a principal focus for the Department of Energy (DOE) and its contractors, and for PGDP regulators and stakeholders. Using a formal investigation, feasibility study and decision process, Electrical Resistance Heating (ERH) was selected for the treatment of the soil and groundwater in the vicinity of C-400. ERH was selected as an interim action to remove 'a significant portion of the contaminant mass of TCE at the C-400 Cleaning Building area through treatment' with the longer term goal of reducing 'the period the TCE concentration in groundwater remains above its Maximum Contaminant Level (MCL).' ERH is a thermal treatment that enhances the removal of TCE and related solvents from soil and groundwater. The heterogeneous conditions at PGDP, particularly the high permeability regional gravel aquifer (RGA), are challenging to ERH. Thus, a phased approach is being followed to implement this relatively expensive and complex remediation technology. Conceptually, the phased approach encourages safety and efficiency by providing a 'lessons learned' process and allowing appropriate adjustments to be identified and implemented prior to follow-on phase(s) of treatment. More specifically, early deployment targeted portions of the challenging RGA treatment zone with relatively little contamination reducing the risk of adverse collateral impacts from underperformance in terms of heating and capture. Because of the importance and scope of the C-400 TCE source remediation activities, DOE chartered an Independent Technical Review (ITR) in

  18. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 78, quarter ending March 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    This report presents descriptions of various research projects and field projects concerned with the enhanced recovery of petroleum. Contract numbers, principal investigators, company names, and project management information is included.

  19. Power capacity of the customers. A review of projects in the 'Market Design' programme

    International Nuclear Information System (INIS)

    Fritz, Peter

    2006-04-01

    An important discussion in later years has been whether the necessary reserves in the electricity market are to be generated through normal market mechanisms, i.e. with the price as the primary controlling parameter, or if it requires a collectively financed effect reserve and how regulations in such a case should be shaped. The issue is first and foremost a matter of where the line is drawn between that which 'the market' should handle and that which can be assured through regulation. Autumn 2002 Svenska Kraftnaet presented an investigation to the government in which it was suggested that the effect balance should primarily be managed through the use of normal pricing mechanisms, but that the state should strengthen responsibility for the nation's effect balance in the period up until 2008. When approaching an effect loss situation, spot prices and the price of balancing power will skyrocket. Today, most people are in agreement that a condition for maintained delivery safety is that normal pricing mechanisms are in place and that consumption actually is affected by high prices. The main reason for this conclusion is that it is very expensive to keep production facilities in reserve for situations that are expected to occur very seldom - it is cheaper to encourage large customers to reduce their consumption. The other reason is that increased price sensitivity creates conditions for a more stable and more predictable pricing development in strained situations. While being aware that a response to increased demand is needed, we see too little of that on the market today. The aim of this project is to present concrete measures that will awaken this slumbering resource. In order to judge how much effect reduction can reasonably be expected and if there is any financial gain for customers, electricity suppliers and grid operators; it has been necessary to cast a few predictions about future price peaks. We estimate price peaks in the 3-10 SEK/kWh interval for an

  20. Federal Government response to the September 12, 2000 environmental assessment report of the EUB-CEAA Joint Review Panel on the Cheviot Coal Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-04-01

    The Federal Court noted four deficiencies in the joint EUB-CEAA environmental review dated September 12, 2000 for the Cheviot Coal Project. The Joint Review Panel reconvened to hear additional evidence about these deficiencies. This memorandum to cabinet comprises the Government of Canada's response to the additional evidence. Some of the Panel's recommendations are accepted. Comments are included regarding migratory birds, protection of traditional aboriginal sites, economic benefits, grizzly bears, and fish habitat.

  1. Incident warning systems : accident review. DRIVE II Project V2002 Horizontal Project for the Evaluation of Safety HOPES, Deliverable 17, Workpackage 31, Activity 31.2.

    NARCIS (Netherlands)

    Oppe, S. Lindeijer, J.E. & Barjonet, P.

    1995-01-01

    The objective of this accident review is to check what proportion of accidents recorded in the past could in principle have been prevented by using an incident warning system (IWS). The accident review was carried out for all three IWS test sites that are part of the HOPES evaluation study. These

  2. Literature and data review for the surface-water pathway: Columbia River and adjacent coastal areas. Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Walters, W.H.; Dirkes, R.L.; Napier, B.A.

    1992-11-01

    As part of the Hanford Environmental Dose Reconstruction (HEDR) Project, Battelle, Pacific Northwest Laboratories reviewed literature and data on radionuclide concentrations and distribution in the water, sediment, and biota of the Columbia River and adjacent coastal areas. Over 600 documents were reviewed including Hanford reports, reports by offsite agencies, journal articles, and graduate theses. Radionuclide concentration data were used in preliminary estimates of individual dose for the period 1964 through 1966. This report summarizes the literature and database reviews and the results of the preliminary dose estimates.

  3. Strengthening the nurses' and healthcare professionals' capacity to deliver culturally competent and compassionate care - An integrative literature review from the IENE4 project

    DEFF Research Database (Denmark)

    Petersen, Rikke Agnete

    There is a need to better prepare nursing and other caring professionals for compassionate and culturally competent care. The IENE4 project aims to adress this need. The authors conducted an review of literature pertaining to three aspects, i.e. universal components of compassion; measuring...... compassion; and learning culturally competent compassion....

  4. Climate change effects on vegetation in the Pacific Northwest: a review and synthesis of the scientific literature and simulation model projections

    Science.gov (United States)

    David W. Peterson; Becky K. Kerns; Erich Kyle Dodson

    2014-01-01

    The purpose of this study was to review scientifi c knowledge and model projections on vegetation vulnerability to climatic and other environmental changes in the Pacifi c Northwest, with emphasis on fi ve major biome types: subalpine forests and alpine meadows, maritime coniferous forests, dry coniferous forests, savannas and woodlands (oak and juniper), and interior...

  5. Weldon Spring Site Remedial Action Project: Report from the DOE voluntary protection program onsite review, November 17--21, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-28

    This report summarizes the Department of Energy Voluntary Protection Program (DOE-VPP) Review Team`s findings from the five-day onsite evaluation of the Weldon Spring Site Remedial Action Project (WSSRAP), conducted November 17--21, 1997. The site was evaluated against the program requirements contained in ``US Department of Energy Voluntary Protection Program, Part 1: Program Elements`` to determine its success in implementing the five tenets of DOE-VPP. DOE-VPP consists of three programs, with names and functions similar to those in OSHA`s VPP. These programs are STAR, MERIT, and DEMONSTRATION. The STAR program is the core of DOE-VPP. The program is aimed at truly outstanding protectors of employee safety and health. The MERIT program is a steppingstone for contractors and subcontractors that have good safety and health programs but need time and DOE guidance to achieve STAR status. The DEMONSTRATION program is rarely used; it allows DOE to recognize achievements in unusual situations about which DOE needs to learn more before determining approval requirements for the STAR status.

  6. Economic impacts of marine ecological change: Review and recent contributions of the VECTORS project on European marine waters

    Science.gov (United States)

    Groeneveld, Rolf A.; Bartelings, Heleen; Börger, Tobias; Bosello, Francesco; Buisman, Erik; Delpiazzo, Elisa; Eboli, Fabio; Fernandes, Jose A.; Hamon, Katell G.; Hattam, Caroline; Loureiro, Maria; Nunes, Paulo A. L. D.; Piwowarczyk, Joanna; Schasfoort, Femke E.; Simons, Sarah L.; Walker, Adam N.

    2018-02-01

    Marine ecological change is likely to have serious potential economic consequences for coastal economies all over the world. This article reviews the current literature on the economic impacts of marine ecological change, as well as a number of recent contributions to this literature carried out under the VECTORS project. We focus on three main types of change, namely invasive alien species; outbreak-forming species, such as jellyfish and toxic algae; and gradual changes in species distribution and productivity. The case studies available in the literature demonstrate that the impacts of invasions and outbreaks on fisheries, aquaculture, and tourism can potentially amount to several tens of millions of dollars each year in some regions. Moreover, stated preference studies suggest a substantial impact on coastal tourism and non-use values that is likely not visible in case studies of specific outbreak events. Climate-driven gradual changes in distribution and productivity of commercial fish stocks will have an impact on fisheries, although these impacts are likely to be overshadowed by much larger changes in prices of seafood and fuel.

  7. Coalbed gas environmental resource information project : fish population and habitat study review : Similkameen and Tulameen coalfields : final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-03-15

    This paper provided an overview of fish and fish habitats in the Similkameen and Tulameen coalfields area. The report consisted of a literature review as well as the examination of a regional-specific database. Discussions and interviews were conducted with First Nations, members of the oil and gas industry, and various governmental and non-governmental organizations. The report identified fish species in the region, and provided details of fish distribution and habitat, and obstructions and constraints to fish populations. Information on sensitive species was also provided. Watershed and hydrological overviews were provided, as well as summary tables for all relevant data. Online mapping and resource databases were used to prepare a profile of fish and fish habitat studies. Sensitive species information was obtained from online governmental mapping resources. The acquired data were then used to produce resource lists and habitat tables for streams and rivers residing within or transiting through the area. Four fish species were identified as species at risk, and an additional fish species was considered to be endangered. It was concluded that a centralized and mandatory reporting system must be developed to ensure that all documents are deposited within a single central library. Approximately 80 per cent of the information gathered for the report did not exist in the Environmental Resources Information Project (ERIP) database. 16 refs., 11 tabs., 1 fig.

  8. Weldon Spring Site Remedial Action Project: Report from the DOE voluntary protection program onsite review, November 17-21, 1997

    International Nuclear Information System (INIS)

    1998-01-01

    This report summarizes the Department of Energy Voluntary Protection Program (DOE-VPP) Review Team's findings from the five-day onsite evaluation of the Weldon Spring Site Remedial Action Project (WSSRAP), conducted November 17--21, 1997. The site was evaluated against the program requirements contained in ''US Department of Energy Voluntary Protection Program, Part 1: Program Elements'' to determine its success in implementing the five tenets of DOE-VPP. DOE-VPP consists of three programs, with names and functions similar to those in OSHA's VPP. These programs are STAR, MERIT, and DEMONSTRATION. The STAR program is the core of DOE-VPP. The program is aimed at truly outstanding protectors of employee safety and health. The MERIT program is a steppingstone for contractors and subcontractors that have good safety and health programs but need time and DOE guidance to achieve STAR status. The DEMONSTRATION program is rarely used; it allows DOE to recognize achievements in unusual situations about which DOE needs to learn more before determining approval requirements for the STAR status

  9. [Review of the methodological, ethical, legal and social issues of research projects in healthcare with big data].

    Science.gov (United States)

    de Lecuona, Itziar

    2018-05-31

    The current model for reviewing research with human beings basically depends on decision-making processes within research ethics committees. These committees must be aware of the importance of the new digital paradigm based on the large-scale exploitation of datasets, including personal data on health. This article offers guidelines, with the application of the EU's General Data Protection Regulation, for the appropriate evaluation of projects that are based on the use of big data analytics in healthcare. The processes for gathering and using this data constitute a niche where current research is developed. In this context, the existing protocols for obtaining informed consent from participants are outdated, as they are based not only on the assumption that personal data are anonymized, but that they will continue to be so in the future. As a result, it is essential that research ethics committees take on new capabilities and revisit values such as privacy and freedom, updating protocols, methodologies and working procedures. This change in the work culture will provide legal security to the personnel involved in research, will make it possible to guarantee the protection of the privacy of the subjects of the data, and will permit orienting the exploitation of data to avoid the commodification of personal data in this era of deidentification, so that research meets actual social needs and not spurious or opportunistic interests disguised as research. Copyright © 2018 SESPAS. Publicado por Elsevier España, S.L.U. All rights reserved.

  10. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  11. Oxide fuel fabrication technology development of the FaCT project (1). Overall review of fuel technology development of the FaCT project

    International Nuclear Information System (INIS)

    Abe, Tomoyuki; Namekawa, Takashi; Tanaka, Kenya

    2011-01-01

    The FaCT project is in progress in Japan for the commercialization of fast reactor cycle system. The development goal of the fuel in the FaCT project is a low-decontaminated TRU homo-recycling in a closed cycle and extension in average discharge burn-up to 150 GWd/t. Research and development on innovative technologies concerning the short process, remote maintenance and cooling system of automatic fuel production equipments, long life cladding material and control of oxygen potential have been conducted in phase I of the FaCT project. As the result of various test including 600 g batch MOX tests, it is concluded that the short process is available to fuel pellet fabrication of the FaCT project. Although cold mock-up tests on test model of some typical process equipments suggest possibilities of remote maintenance of automatic fuel fabrication equipment, it is concluded that it still needs further efforts to judge the operability of the completely remote fabrication for low-decontaminated TRU fuel. A cold mock-up test on fuel pin assembling equipment show that influence of decay heat of MA can be managed by cooling system. Irradiation tests in BOR-60 indicate that 9Cr-ODS possess the satisfactory in-reactor performance as the long life cladding material if homogeneity of alloy element is adequately controlled. Modification of cladding tube fabrication process to ensure homogeneity and further development of measures to control oxygen potential inside the fuel pin are necessary to reach the burn-up target of the FaCT project. (author)

  12. Independent Peer Review of Communications, Navigation, and Networking re-Configurable Testbed (CoNNeCT) Project Antenna Pointing Subsystem (APS) Integrated Gimbal Assembly (IGA) Structural Analysis

    Science.gov (United States)

    Raju, Ivatury S.; Larsen, Curtis E.; Pellicciotti, Joseph W.

    2010-01-01

    Glenn Research Center Chief Engineer's Office requested an independent review of the structural analysis and modeling of the Communications, Navigation, and Networking re-Configurable Testbed (CoNNeCT) Project Antenna Pointing Subsystem (APS) Integrated Gimbal Assembly (IGA) to be conducted by the NASA Engineering and Safety Center (NESC). At this time, the IGA had completed its critical design review (CDR). The assessment was to be a peer review of the NEi-NASTRAN1 model of the APS Antenna, and not a peer review of the design and the analysis that had been completed by the GRC team for CDR. Thus, only a limited amount of information was provided on the structural analysis. However, the NESC team had difficulty separating analysis concerns from modeling issues. The team studied the NASTRAN model, but did not fully investigate how the model was used by the CoNNeCT Project and how the Project was interpreting the results. The team's findings, observations, and NESC recommendations are contained in this report.

  13. Towards a greater understanding of the illicit tobacco trade in Europe: a review of the PMI funded 'Project Star' report.

    Science.gov (United States)

    Gilmore, Anna B; Rowell, Andy; Gallus, Silvano; Lugo, Alessandra; Joossens, Luk; Sims, Michelle

    2014-05-01

    Following a legal agreement with the European Union (EU), Philip Morris International (PMI) commissions a yearly report ('Project Star', PS) on the European illicit cigarette trade from KPMG, the global accountancy firm. Review of PS 2010 report. Comparison with data from independent sources including a 2010 pan-European survey (N=18,056). Within PS, data covering all 27 EU countries are entered into a model. While the model itself seems appropriate, concerns are identified with the methodologies underlying the data inputs and thus their quality: there is little transparency over methodologies; interview data underestimate legal non-domestic product partly by failing to account for legal cross-border sales; illicit cigarette estimates rely on tobacco industry empty pack surveys which may overestimate illicit; and there is an over-reliance on data supplied by PMI with inadequate external validation. Thus, PMI sales data are validated using PMI smoking prevalence estimates, yet PMI is unable to provide sales (shipment) data for the Greek islands and its prevalence estimates differ grossly from independent data. Consequently, comparisons with independent data suggest PS will tend to overestimate illicit cigarette levels particularly where cross-border shopping is frequent (Austria, Finland, France) and in Western compared with Eastern European countries. The model also provides data on the nature of the illicit cigarette market independent of seizure data suggesting that almost a quarter of the illicit cigarette market in 2010 comprised PMI's own brands compared with just 5% counterfeited PMI brands; a finding hidden in PMI's public representation of the data. PS overestimates illicit cigarette levels in some European countries and suggests PMI's supply chain control is inadequate. Its publication serves the interests of PMI over those of the EU and its member states. PS requires greater transparency, external scrutiny and use of independent data. Published by the BMJ

  14. Project Management and the Project Manager: A Strategy for ...

    African Journals Online (AJOL)

    International Journal of Development and Management Review ... collapse, project failure, project abandonment, project cost and time overruns, etc. ... component parts that constitute project management in the building construction industry.

  15. The Ethiopian Flora Project

    DEFF Research Database (Denmark)

    Demissew, Sebsebe; Brochmann, Christian; Kelbessa, Ensermu

    2011-01-01

    The account reviews and analyses the scietific projects derived from activities in connection with the Ethiopian Flora Project, including the [Ethiopian] Monocot Project, the Afro-alpine "Sky-island" project, the Vegetation and Ecological Conditions of Plantations Project, the Fire Ecology Projec...

  16. Federal response to the environmental assessment report of the NRCB-CEAA joint review panel on the Little Bow project/Highwood diversion plan

    International Nuclear Information System (INIS)

    1999-01-01

    In June 1998, a joint review panel released a report on a dam and diversion project proposed by Alberta Public Works, Supply and Services. This document is the response to that report addressing its recommendations to the federal government and other recommendations or statements pertinent to federal areas of jurisdiction and interest. It begins with background on the proposed project, then presents the report's recommendations or statements along with the federal responses with regard to the following issue areas: Regulatory approval; navigable waters and the public right of navigation; fish and fish habitat; wetlands and wildlife; and Aboriginal concerns

  17. The monitoring, evaluation, reporting, and verification of climate change mitigation projects: Discussion of issues and methodologies and review of existing protocols and guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Vine, E.; Sathaye, J.

    1997-12-01

    Because of concerns with the growing threat of global climate change from increasing emissions of greenhouse gases, the US and other countries are implementing, by themselves or in cooperation with one or more other nations (i.e., joint implementation), climate change mitigation projects. These projects will reduce greenhouse gas (GHG) emissions or sequester carbon, and will also result in non-GHG impacts (i.e., environmental, economic, and social impacts). Monitoring, evaluating, reporting, and verifying (MERV) guidelines are needed for these projects in order to accurately determine their net GHG, and other, benefits. Implementation of MERV guidelines is also intended to: (1) increase the reliability of data for estimating GHG benefits; (2) provide real-time data so that mid-course corrections can be made; (3) introduce consistency and transparency across project types and reporters; and (4) enhance the credibility of the projects with stakeholders. In this paper, the authors review the issues and methodologies involved in MERV activities. In addition, they review protocols and guidelines that have been developed for MERV of GHG emissions in the energy and non-energy sectors by governments, nongovernmental organizations, and international agencies. They comment on their relevance and completeness, and identify several topics that future protocols and guidelines need to address, such as (1) establishing a credible baseline; (2) accounting for impacts outside project boundaries through leakage; (3) net GHG reductions and other impacts; (4) precision of measurement; (5) MERV frequency; (6) persistence (sustainability) of savings, emissions reduction, and carbon sequestration; (7) reporting by multiple project participants; (8) verification of GHG reduction credits; (9) uncertainty and risk; (10) institutional capacity in conducting MERV; and (11) the cost of MERV.

  18. ERM 593 Applied Project_Guidance for Reviewing and Approving a Waste Stream Profile in the Waste Compliance and Tracking System_Final_05-05-15

    Energy Technology Data Exchange (ETDEWEB)

    Elicio, Andy U. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-05-05

    My ERM 593 applied project will provide guidance for the Los Alamos National Laboratory Waste Stream Profile reviewer (i.e. RCRA reviewer) in regards to Reviewing and Approving a Waste Stream Profile in the Waste Compliance and Tracking System. The Waste Compliance and Tracking system is called WCATS. WCATS is a web-based application that “supports the generation, characterization, processing and shipment of LANL radioactive, hazardous, and industrial waste.” The LANL generator must characterize their waste via electronically by filling out a waste stream profile (WSP) in WCATS. Once this process is completed, the designated waste management coordinator (WMC) will perform a review of the waste stream profile to ensure the generator has completed their waste stream characterization in accordance with applicable state, federal and LANL directives particularly P930-1, “LANL Waste Acceptance Criteria,” and the “Waste Compliance and Tracking System User's Manual, MAN-5004, R2,” as applicable. My guidance/applied project will describe the purpose, scope, acronyms, definitions, responsibilities, assumptions and guidance for the WSP reviewer as it pertains to each panel and subpanel of a waste stream profile.

  19. A retrospective review of required projects in systems-based practice in a single anesthesiology residency: a 10-year experience.

    Science.gov (United States)

    Sakai, Tetsuro; Emerick, Trent D; Patel, Rita M

    2015-09-01

    The Accreditation Council for Graduate Medical Education has emphasized in its core competencies and more recently, in its Milestones Project, that residents understand the importance of systems-based practice (SBP). The objectives of the study are to evaluate the quality of residents' SBP projects and to determine the degrees that were subsequently implemented. A retrospective educational observational study. A university-based anesthesiology training institution. One hundred forty-nine anesthesiology residents in their final (postgraduate year 4) year of training who completed SBP projects for the last 10 years (2004-2013). A structured SBP course was provided for postgraduate year 4 anesthesiology residents with deadlines set such as project identification, data collection, and proposal draft. Each resident's written SBP proposal received inputs by 2 members of the department executive steering committee. The SBP projects concluded with oral presentations by each resident to the department executive steering committee, who provided overall scores. All SBP projects were categorized into 7 categories: safety initiatives, economic analysis, process analysis, policy change recommendations, education initiatives, teamwork/communication, and operating room efficiency. Evaluation scores using a Likert scale (1-9, where 9 is the best) were analyzed. The rate of implementation of project ideas within the department based on the presentations to the executive committee was examined. Of 149 projects, policy change recommendations was the most frequently chosen category (46 projects; 30.9%), followed by process analysis (36 projects; 24.2%). The overall evaluation score was 7.6 ± 0.6 (mean ± SD). A total of 53 projects (35.6%) were implemented in the department. There was no statistical difference between SBPs with implementation vs SBPs without implementation in terms of evaluation scores, year of the presentation, or categories. This SBP project has given residents the

  20. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 83, quarter ending June 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    Summaries of 41 research projects on enhanced recovery are presented under the following sections: (1) chemical flooding; (2) gas displacement; (3) thermal recovery; (4) geoscience technology; (5) resource assessment technology; and (6) reservoir classes. Each presentation gives the title of the project, contract number, research facility, contract date, expected completion data, amount of the award, principal investigator, and DOE program manager, and describes the objectives of the project and a summary of the technical progress.

  1. Kaiser Engineers Hanford internal position paper -- Project W-236A, Multi-function Waste Tank Facility -- Peer reviews of selected activities

    International Nuclear Information System (INIS)

    Stine, M.D.

    1995-01-01

    The purpose of this paper is to develop and document a proposed position on the performance of independent peer reviews on selected design and analysis components of the Title 1 [Preliminary] and Title 2 [Final] design phases of the Multi-Function Waste Tank Facility [MWTF] project. An independent, third-party peer review is defined as a documented critical review of documents, data, designs, design inputs, tests, calculations, or related materials. The peer review should be conducted by persons independent of those who performed the work, but who are technically qualified to perform the original work. The peer review is used to assess the validity of assumptions and functional requirements, to assess the appropriateness and logic of selected methodologies and design inputs, and to verify calculations, analyses and computer software. The peer review can be conducted at the end of the design activity, at specific stages of the design process, or continuously and concurrently with the design activity. This latter method is often referred to as ''Continuous Peer Review.''

  2. NRC review of Electric Power Research Institute's Advanced Light Reactor Utility Requirements Document - Program summary, Project No. 669

    International Nuclear Information System (INIS)

    1992-08-01

    The staff of the US Nuclear Regulatory Commission has prepared Volume 1 of a safety evaluation report (SER), ''NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document -- Program Summary,'' to document the results of its review of the Electric Power Research Institute's ''Advanced Light Water Reactor Utility Requirements Document.'' This SER provides a discussion of the overall purpose and scope of the Requirements Document, the background of the staff's review, the review approach used by the staff, and a summary of the policy and technical issues raised by the staff during its review

  3. Systematic review on what works, what does not work and why of implementation of mobile health (mHealth) projects in Africa.

    Science.gov (United States)

    Aranda-Jan, Clara B; Mohutsiwa-Dibe, Neo; Loukanova, Svetla

    2014-02-21

    Access to mobile phone technology has rapidly expanded in developing countries. In Africa, mHealth is a relatively new concept and questions arise regarding reliability of the technology used for health outcomes. This review documents strengths, weaknesses, opportunities, and threats (SWOT) of mHealth projects in Africa. A systematic review of peer-reviewed literature on mHealth projects in Africa, between 2003 and 2013, was carried out using PubMed and OvidSP. Data was synthesized using a SWOT analysis methodology. Results were grouped to assess specific aspects of project implementation in terms of sustainability and mid/long-term results, integration to the health system, management process, scale-up and replication, and legal issues, regulations and standards. Forty-four studies on mHealth projects in Africa were included and classified as: "patient follow-up and medication adherence" (n = 19), "staff training, support and motivation" (n = 2), "staff evaluation, monitoring and guidelines compliance" (n = 4), "drug supply-chain and stock management" (n = 2), "patient education and awareness" (n = 1), "disease surveillance and intervention monitoring" (n = 4), "data collection/transfer and reporting" (n = 10) and "overview of mHealth projects" (n = 2). In general, mHealth projects demonstrate positive health-related outcomes and their success is based on the accessibility, acceptance and low-cost of the technology, effective adaptation to local contexts, strong stakeholder collaboration, and government involvement. Threats such as dependency on funding, unclear healthcare system responsibilities, unreliable infrastructure and lack of evidence on cost-effectiveness challenge their implementation. mHealth projects can potentially be scaled-up to help tackle problems faced by healthcare systems like poor management of drug stocks, weak surveillance and reporting systems or lack of resources. mHealth in Africa is an innovative approach

  4. Alcolocks : factors influencing implementation, participation and compliance : literature review contributed to the EU project Alcolock Implementation in the European Union.

    NARCIS (Netherlands)

    Mathijssen, M.P.M.

    2007-01-01

    In 2004-2005, a series of alcolock field trials were conducted in four European countries, in the framework of the EU research project Alcolock Implementation in the European Union. This project was granted by the European Commission, Directorate-General for Energy and Transport (DG-TREN). As part

  5. Effective e-learning for health professionals and students--barriers and their solutions. A systematic review of the literature--findings from the HeXL project.

    Science.gov (United States)

    Childs, Sue; Blenkinsopp, Elizabeth; Hall, Amanda; Walton, Graham

    2005-12-01

    In 2003/4 the Information Management Research Institute, Northumbria University, conducted a research project to identify the barriers to e-learning for health professionals and students. The project also established possible ways to overcome these barriers. The North of England Workforce Development Confederation funded the project. The project comprised a systematic review of the literature on barriers to and solutions/critical success factors for e-learning in the health field. Fifty-seven references were suitable for analysis. This review was supplemented by a questionnaire survey of learners and an interview study of learning providers to ensure that data identified from the literature were grounded in reality. The main barriers are: requirement for change; costs; poorly designed packages; inadequate technology; lack of skills; need for a component of face-to-face teaching; time intensive nature of e-learning; computer anxiety. A range of solutions can solve these barriers. The main solutions are: standardization; strategies; funding; integration of e-learning into the curriculum; blended teaching; user friendly packages; access to technology; skills training; support; employers paying e-learning costs; dedicated work time for e-learning. The authors argue that librarians can play an important role in e-learning: providing support and support materials; teaching information skills; managing and providing access to online information resources; producing their own e-learning packages; assisting in the development of other packages.

  6. Review to give the public clear information on near surface disposal project of low-level radioactive wastes generated from research, industrial and medical facilities

    International Nuclear Information System (INIS)

    Shobu, Nobuhiro; Amazawa, Hiroya; Koibuchi, Hiroto; Nakata, Hisakazu; Kato, Masatoshi; Takao, Tomoe; Terashima, Daisuke; Tanaka, Yoshie; Shirasu, Hisanori

    2013-12-01

    Japan Atomic Energy Agency (hereafter abbreviated as “JAEA”) has promoted near surface disposal project for low-level radioactive wastes generated from research, industrial and medical facilities after receiving project approval from the government in November 2009. JAEA has carried out public information about low-level radioactive wastes disposal project on the web site. When some town meetings are held toward mutual understanding with the public, more detailed and clear explanations for safety management of near surface disposal are needed especially. Therefore, the information provision method to make the public understand should be reviewed. Moreover, a web-based survey should be carried out in order to get a sense of what the public knows, what it values and where it stands on nuclear energy and radiation issues, because the social environment surrounding nuclear energy and radiation issues has drastically changed as a result of the accident at the Fukushima Daiichi Nuclear Power Station on March 11, 2011. This review clarified the points to keep in mind about public information on near surface disposal project for low-level radioactive wastes generated from research, industrial and medical facilities, and that public awareness and understanding toward nuclear energy and radiation was changed before and after the accident at Fukushima Daiichi Nuclear Power Plant. (author)

  7. Project Communications Management

    OpenAIRE

    José C. Santiago-Guevara; Mauricio Rojas-Contreras; Luis A. Esteban-Villamizar

    2013-01-01

    This article presents a review in relation to the object of study: Communications Management as an important factor in the management of projects. The review includes the most relevant and most renowned authors in the field of project management, focusing on telecommunications projects, which lets you define a communications management model.

  8. Literature review for Texas Department of Transportation Research Project 0-4695: Guidance for design in areas of extreme bed-load mobility, Edwards Plateau, Texas

    Science.gov (United States)

    Heitmuller, Franklin T.; Asquith, William H.; Fang, Xing; Thompson, David B.; Wang, Keh-Han

    2005-01-01

    A review of the literature addressing sediment transport in gravel-bed river systems and structures designed to control bed-load mobility is provided as part of Texas Department of Transportation research project 0–4695: Guidance for Design in Areas of Extreme Bed-Load Mobility. The study area comprises the western half of the Edwards Plateau in central Texas. Three primary foci of the literature review are journal articles, edited volumes, and government publications. Major themes within the body of literature include deterministic sediment transport theory and equations, development of methods to measure and analyze fluvial sediment, applications and development of theory in natural channels and flume experiments, and recommendations for river management and structural design. The literature review provides an outline and foundation for the research project to characterize extreme bed-load mobility in rivers and streams across the study area. The literature review also provides a basis upon which potential modifications to low-water stream-crossing design in the study area can be made.

  9. [Review comments on the Draft DOE Area Recommendation Report for the Crystalline Repository Project]: Final technical report

    International Nuclear Information System (INIS)

    Dutch, S.I.; Stiegliltz, R.D.

    1986-03-01

    Research performed under the grant primarily involved review and comment on the Draft Area Recommendations Report (DARR). However, because data and ''recommendations'' included in the DARR are unquestionably tied to years of research and dozens of technical reports and documents, i.e., Screening Methodologies, Regional characterization Reports, etc., it is essential that consultants to the Menominee Tribe review all the relevant DOE documents, working papers, etc. Given the short period provided for technical comment and limited funds available to the Tribe, a well designed and thorough technical review was (and is) without question impossible. What review and comment that did occur on a geotechnical level is included in this report

  10. Systematic review on what works, what does not work and why of implementation of mobile health (mHealth) projects in Africa

    Science.gov (United States)

    2014-01-01

    Background Access to mobile phone technology has rapidly expanded in developing countries. In Africa, mHealth is a relatively new concept and questions arise regarding reliability of the technology used for health outcomes. This review documents strengths, weaknesses, opportunities, and threats (SWOT) of mHealth projects in Africa. Methods A systematic review of peer-reviewed literature on mHealth projects in Africa, between 2003 and 2013, was carried out using PubMed and OvidSP. Data was synthesized using a SWOT analysis methodology. Results were grouped to assess specific aspects of project implementation in terms of sustainability and mid/long-term results, integration to the health system, management process, scale-up and replication, and legal issues, regulations and standards. Results Forty-four studies on mHealth projects in Africa were included and classified as: “patient follow-up and medication adherence” (n = 19), “staff training, support and motivation” (n = 2), “staff evaluation, monitoring and guidelines compliance” (n = 4), “drug supply-chain and stock management” (n = 2), “patient education and awareness” (n = 1), “disease surveillance and intervention monitoring” (n = 4), “data collection/transfer and reporting” (n = 10) and “overview of mHealth projects” (n = 2). In general, mHealth projects demonstrate positive health-related outcomes and their success is based on the accessibility, acceptance and low-cost of the technology, effective adaptation to local contexts, strong stakeholder collaboration, and government involvement. Threats such as dependency on funding, unclear healthcare system responsibilities, unreliable infrastructure and lack of evidence on cost-effectiveness challenge their implementation. mHealth projects can potentially be scaled-up to help tackle problems faced by healthcare systems like poor management of drug stocks, weak surveillance and reporting systems or

  11. Literature Review of Advantages and Disadvantages of Pre-planned Construction Projects 2013 PhD Conference

    DEFF Research Database (Denmark)

    Larsen, Jesper Kranker; Ussing, Lene Faber; Brunø, Thomas Ditlev

    2013-01-01

    The construction industry’s focus on pre-planning, with its advantages and disadvantages, has not been investigated in a literature review which gives a state of art understanding of the topic. The aim of the paper is to review related papers, to fulfill gaps in the literature which could...

  12. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 86, quarter ending March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    Summaries are presented for 37 enhanced oil recovery contracts being supported by the Department of Energy. The projects are grouped into gas displacement methods, thermal recovery methods, geoscience technology, reservoir characterization, and field demonstrations in high-priority reservoir classes. Each summary includes the objectives of the project and a summary of the technical progress, as well as information on contract dates, size of award, principal investigator, and company or facility doing the research.

  13. A critical review of the life sciences project management at Ames Research Center for the Spacelab Mission development test 3

    Science.gov (United States)

    Helmreich, R. L.; Wilhelm, J. M.; Tanner, T. A.; Sieber, J. E.; Burgenbauch, S. F.

    1979-01-01

    A management study was initiated by ARC (Ames Research Center) to specify Spacelab Mission Development Test 3 activities and problems. This report documents the problems encountered and provides conclusions and recommendations to project management for current and future ARC life sciences projects. An executive summary of the conclusions and recommendations is provided. The report also addresses broader issues relevant to the conduct of future scientific missions under the constraints imposed by the space environment.

  14. A review on weaknesses and strengths of delivering Mehr housing project in terms of achieving economical goals

    Directory of Open Access Journals (Sweden)

    Ali Karshenasan

    2013-09-01

    Full Text Available Housing is one of the most important sections of development in a country and its economic importance has put it in the center of attention. It can cause rise and depression of habitation by its extended economic aspects. Mehr Housing plan is a state run housing project in most cities started 2007 in Iran to protect and provide cheap housing for poor people and young couples. Mehr housing project by its large scale and wide dimensions can affect the society’s economy. Therefore, to investigate weaknesses and strengths of this project in terms of economic and applying necessary reformation can increase the success probability of this project. For this purpose, this study assess the weaknesses and strengths of Mehr housing of province of Khorram Abad in Iran for achieving economic goals and also presents solutions to better access to these goals. Time scope of the present study is 6 months of 2011 and the second 3 months of 2012. The methodology is applicable in terms of goal and is descriptive survey in terms of nature. In this study, a combined method of interviewing to experts and distributing a questionnaire among the applicants of Mehr housing has been used for data collecting. Among strengths of Khorram Abad in economic section, employment and urban landfill pattern reformation can be implied. In addition, among weaknesses of this project are lack of proper first design and technical justification of the project and use of only 2 shabby fabrics.

  15. Are project managers ready for the 21th challenges? A review of problem structuring methods for decision support

    Directory of Open Access Journals (Sweden)

    José Mateo

    2017-01-01

    Full Text Available Numerous contemporary problems that project managers face today can be considered as unstructured decision problems characterized by multiple actors and perspectives, incommensurable and/or conflicting objectives, and important intangibles. This work environment demands that project managers possess not only hard skills but also soft skills with the ability to take a management perspective and, above all, develop real leadership capabilities. In this paper, a family of problem structured methods for decision support aimed at assisting project managers in tackling complex problems are presented. Problem structured methods are a family of soft operations research methods for decision support that assist groups of diverse composition to agree a problem focus and make commitments to consequential action. Project management programs are challenged to implement these methodologies in such a way that it is organized around the key competences that a project manager needs in order to be more effective, work efficiently as members of interdisciplinary teams and successfully execute even a small project.

  16. Reviews

    Science.gov (United States)

    2002-11-01

    CD-ROM REVIEW (551) Essential Physics BOOK REVIEWS (551) Collins Advanced Science: Physics, 2nd edition Quarks, Leptons and the Big Bang, 2nd edition Do Brilliantly: A2 Physics IGCSE Physics Geophysics in the UK Synoptic Skills in Advanced Physics Flash! The hunt for the biggest explosions in the universe Materials Maths for Advanced Physics

  17. Project WAGR: the UK demonstration project for power reactor decommissioning - a review of the tools used to dismantle the reactor core

    International Nuclear Information System (INIS)

    Benest, T.G.

    2008-01-01

    route through which to move, sort, assay condition and package the waste. The RDM and associated hoist have been used to deploy the numerous tools and end effectors necessary to effect the painstaking dismantling process. Now that the remote operations are reaching a conclusion it is possible to review the success of both these tools and the RDM itself. This paper summarises the results of the review, draws conclusions and by taking particular examples illustrates the lessons learned. (author)

  18. Reviews.

    Science.gov (United States)

    Journal of Chemical Education, 1987

    1987-01-01

    Provides a review of both the Apple and IBM versions of ENZPACK, a software package which is designed to assist in the teaching of enzyme kinetics in courses where this topic is treated in some depth. (TW)

  19. Review

    Indian Academy of Sciences (India)

    2012-03-29

    Mar 29, 2012 ... The present review documents an overview of speciation mediated through behavioural ...... The Drosophila model (New York: Oxford University Press) .... second part of his big species book written from 1856–1858. (New ...

  20. Housing First for People With Severe Mental Illness Who Are Homeless: A Review of the Research and Findings From the At Home–Chez soi Demonstration Project

    Science.gov (United States)

    Aubry, Tim; Nelson, Geoffrey; Tsemberis, Sam

    2015-01-01

    Objective: To provide a review of the extant research literature on Housing First (HF) for people with severe mental illness (SMI) who are homeless and to describe the findings of the recently completed At Home (AH)–Chez soi (CS) demonstration project. HF represents a paradigm shift in the delivery of community mental health services, whereby people with SMI who are homeless are supported through assertive community treatment or intensive case management to move into regular housing. Method: The AH–CS demonstration project entailed a randomized controlled trial conducted in 5 Canadian cities between 2009 and 2013. Mixed methods were used to examine the implementation of HF programs and participant outcomes, comparing 1158 people receiving HF to 990 people receiving standard care. Results: Initial research conducted in the United States shows HF to be a promising approach, yielding superior outcomes in helping people to rapidly exit homelessness and establish stable housing. Findings from the AH–CS demonstration project reveal that HF can be successfully adapted to different contexts and for different populations without losing its fidelity. People receiving HF achieved superior housing outcomes and showed more rapid improvements in community functioning and quality of life than those receiving treatment as usual. Conclusions: Knowledge translation efforts have been undertaken to disseminate the positive findings and lessons learned from the AH–CS project and to scale up the HF approach across Canada. PMID:26720504

  1. How to Find Optimal National Model of Pension System: the Projection on Russia (Book Review: Barr, N. Pension reform: A short guide [Text] / N. Barr, P. Diamond. – Oxford : Oxford University Press, 2010. – 261 p.

    Directory of Open Access Journals (Sweden)

    Karen Avakovich Tumanyants

    2015-12-01

    Full Text Available How to Find Optimal National Model of Pension System: the Projection on Russia (Book Review: Barr, N. Pension reform: A short guide [Text] / N. Barr, P. Diamond. – Oxford : Oxford University Press, 2010. – 261 p.

  2. Map projections cartographic information systems

    CERN Document Server

    Grafarend, Erik W

    2006-01-01

    In the context of Geographical Information Systems (GIS) the book offers a timely review of map projections (sphere, ellipsoid, rotational surfaces) and geodetic datum transformations. For the needs of photogrammetry, computer vision, and remote sensing space projective mappings are reviewed.

  3. Ethics review as a component of institutional approval for a multicentre continuous quality improvement project: the investigator's perspective

    Directory of Open Access Journals (Sweden)

    von Dadelszen Peter

    2010-07-01

    Full Text Available Abstract Background For ethical approval of a multicentre study in Canada, investigators must apply separately to individual Research Ethics Boards (REBs. In principle, the protection of human research subjects is of utmost importance. However, in practice, the process of multicentre ethics review can be time consuming and costly, requiring duplication of effort for researchers and REBs. We used our experience with ethical review of The Canadian Perinatal Network (CPN, to gain insight into the Canadian system. Methods The applications forms of 16 different REBs were abstracted for a list of standardized items. The application process across sites was compared. Correspondence between the REB and the investigators was documented in order to construct a timeline to approval, identify the specific issues raised by each board, and describe how they were resolved. Results Each REB had a different application form. Most (n = 9 had a two or three step application process. Overall, it took a median of 31 days (range 2-174 days to receive an initial response from the REB. Approval took a median of 42 days (range 4-443 days. Privacy and consent were the two major issues raised. Several additional minor or administrative issues were raised which delayed approval. Conclusions For CPN, the Canadian REB process of ethical review proved challenging. REBs acted independently and without unified application forms or submission procedures. We call for a critical examination of the ethical, privacy and institutional review processes in Canada, to determine the best way to undertake multicentre review.

  4. An International Peer Review of the Safety Options Dossier of the Project for Disposal of Radioactive Waste in Deep Geological Formations (Cigéo). Final Report of the IAEA International Review Team November 2016

    International Nuclear Information System (INIS)

    2017-07-01

    The French Nuclear Safety Authority (Autorité de sûreté nucléaire, ASN) is preparing the evaluation of a licence application for the creation of a deep geological disposal facility in 2018, called Cigéo, for intermediate level, high level and long lived radioactive waste. This licence is preceded by the submission of a Safety Options Dossier to ASN, which provides the French National Radioactive Waste Management Agency (Agence nationale pour la gestion des déchets radioactifs, Andra) the possibility to receive advice from ASN on the preparation of the licence application on the safety principles and approach. The Safety Options Dossier sets out the chosen objectives, concepts and principles for ensuring the safety of the facility. ASN requested the IAEA to organize an international peer review of the Safety Options Dossier. This publication presents the consensus view of the international group of experts convened by the IAEA to conduct the review against the relevant IAEA safety standards and proven international practice and experience. The experts acted in a personal capacity and the views expressed do not necessarily reflect those of the IAEA, the governments of the nominating Member States or the nominating organizations. The basis of this peer review is the set of documents provided by Andra, as the agency responsible for the development of the Cigéo project and for its safety. Consequently, the findings of the reviews are addressed directly to Andra. This publication, however, is primarily submitted to ASN to review the outcomes of the Andra project.

  5. Development and implementation of technologies for physical telerehabilitation in Latin America: a systematic review of literature, programs and projects

    OpenAIRE

    Narváez, Fabián; Marín-Castrillón, Diana M; Cuenca, Ma. Cisne; Latta, Ma. Augusta

    2017-01-01

    Abstract Telerehabilitation has arised by the inclusion of emerging technologies for capturing, transmitting, analyzing and visualizing movement patterns associated to musculoskeletal disorders. This therapeutic strategy enables to carry out diagnosis processes and provide rehabilitation treatments. This paper presents a systematic review of the current development and implementation of telerehabilitation technologies in Latin America. The main goal is to explore the scientific literature and...

  6. Improvement of the nutritional quality of barley and spring wheat: A review of the FAO/SIDA/SAREC project

    International Nuclear Information System (INIS)

    Hayes, I.D.

    1984-01-01

    The main aim of the joint FAO/SIDA/SAREC project was to develop new varieties of barley and spring wheat adapted to conditions in developing countries and with increased protein and lysine contents of the grain. Six premier research institutes in Egypt, Ethiopia, India, Iran, Pakistan and Turkey co-operated in the project under the technical leadership of Svaloev AB, formerly the Swedish Seed Association, during the period 1974 to 1981. Barley lines having grain with high protein and high lysine contents derived from Hiproly, Risoe 1508 and B1 were used as donors and backcrossed at Svaloev into adapted breeding material provided by breeders in the participating countries. Backcrosses and other progenies selected for homozygosity of the lysine genes on the basis of their protein content and dye-binding capacity (DBC) were distributed to the participants who continued selection in their own environments. A similar programme was initiated for wheat, based largely on Atlas 66, Nap Hal and Rageni as donors of high protein and lysine, but the expression of high lysine was very weakly inherited and selection was abandoned in 1978. It has proved extremely difficult, and so far impossible, to find high yielding lines with desirable agronomic characters combined with increased protein and lysine contents. Evidence of positive improvement in protein production per unit area was obtained in both wheat and barley in India. Under the aegis of the project over 14,000 lines of wheat and nearly 21,000 lines of barley, which included around 6,000 mutant progenies, were screened for protein content and DBC values at Svaloev, but no new prospective donors were identified that were superior to those already available. Conclusions are drawn concerning the benefit of the project and suggestions are made for further action. (author)

  7. Factors influencing the development of primary care data collection projects from electronic health records: a systematic review of the literature

    OpenAIRE

    Gentil, Marie-Line; Cuggia, Marc; Fiquet, Laure; Hagenbourger, Camille; Le Berre, Thomas; Banâtre, Agnès; Renault, Eric; Bouzille, Guillaume; Chapron, Anthony

    2017-01-01

    Background Primary care data gathered from Electronic Health Records are of the utmost interest considering the essential role of general practitioners (GPs) as coordinators of patient care. These data represent the synthesis of the patient history and also give a comprehensive picture of the population health status. Nevertheless, discrepancies between countries exist concerning routine data collection projects. Therefore, we wanted to identify elements that influence the development and dur...

  8. Review

    DEFF Research Database (Denmark)

    Van Den Hazel, H B; Kielland-Brandt, Morten; Winther, Jakob R.

    1996-01-01

    The yeast vacuole, which is equivalent to the lysosome of higher eukaryotes, is one of the best characterized degradative organelles. This review describes the biosynthesis and function of yeast vacuolar proteases. Most of these enzymes are delivered to the vacuole via the early compartments...

  9. Reviews

    NARCIS (Netherlands)

    Adema, Frits

    1995-01-01

    This is the second volume of a revision of Tabernaemontana (Apocynaceae). The volume covers the New World species (44) and the genus Stemmadenia (10 species). This part of the revision of Tabernaemontana comes up to the high standards set in the first volume [see the review by Leenhouts, Blumea 38

  10. Reviews.

    Science.gov (United States)

    Science Teacher, 1989

    1989-01-01

    Reviews a software planetarium package called "Sky Travel." Includes two audiovisuals: "Conquest of Space" and "Windows on Science: Earth Science"; and four books: "Small Energy Sources: Choices that Work,""Stonehenge Complete,""Uneasy Careers and Intimate Lives: Women in Science…

  11. REVIEW

    African Journals Online (AJOL)

    2012-03-01

    Mar 1, 2012 ... narrowing the gap between recommended treatment protocols in ... for pregnant women is complicated by the need to take into account the health and safety of both the ... meta-analysis as at July 2011 (which reviews the APR and other ... 0.82 - 3.18) and relative risk of birth defects in EFV-containing ART.

  12. Review

    Indian Academy of Sciences (India)

    Review. J. Astrophys. Astr., Vol. 36, No. 4, December 2015, pp. 623–634 ..... 4000 K ≤ T ≤ 10000 K. The processes (1b) are characterized in this paper via ..... Mihajlov, A. A., Sreckovic, V. A., Ignjatovic, L. M., Klyucharev, A. N. 2012, J. Cluster.

  13. Review

    NARCIS (Netherlands)

    Kalkman, C.; Adema, F.

    1998-01-01

    This book intends (according to the preface) to afford at once a review, a general outline of what has been accomplished, and a set of signposts for the future. It attempts to do so in three sections on Origin and Diversification of Primitive Land Plants (4 papers), Origin and Diversification of

  14. Review

    NARCIS (Netherlands)

    Wilde, de W.J.J.O.

    1994-01-01

    This review marks the appearance of Volume II, after the publication of Volume I, Pteridophytes and Gymnosperms, in 1990; several more volumes are expected in the future before completion of the Vascular plants as a whole. The present volume contains 73 families out of some 250-500 families which

  15. Review report 2004. The Danish offshore wind farm demonstration project: Horns Rev and Nysted offshore wind farms. Environmental impact assessment and monitoring

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-10-15

    The present review report presents the two wind farms Horns Rev and Nysted with regard to environmental characteristics and the results of the environmental studies carried out in connection with the Environmental Impact Assessment (EIA) and the baseline and monitoring programmes at the two sites. The descriptions of the programmes are based on extracts from the individual annual reports. Detailed information on method, programmes and conclusions can be found in these reports (see Appendix 1). This review report is divided into two parts. The first part contains a description of the potential environmental impacts of offshore wind farms and the potentially affected part of the environment. The second part includes a description of Horns Rev and Nysted Offshore Wind Farm and the environmental studies carried out here until the end of 2003. Appendix I is a list of the literature published on the studies carried out at Horns Rev and Nysted Offshore Wind Farm. Appendix II is a list of some of the literature relevant to the demonstration projects but not directly related to the projects. The offshore wind farm situated in the Roedsand area is officially denoted Nysted Offshore Wind Farm, and in the present report the denotation 'Nysted' will be used as well when referring to Nysted Offshore Wind Farm. The denotation Roedsand will be used when referring to the actual area Roedsand. (au)

  16. Review report 2003. The Danish offshore wind farm demonstration project: Horns Rev and Nysted offshore wind farms. Environmental impact assessment and monitoring

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-09-15

    The present review report presents the two wind farms Homs Rev and Nysted, with regard to environmental characteristics and the results of the environmental studies carried out in connection with the Environmental Impact Assessment (EIA) and the baseline and monitoring programmes at the two sites. The descriptions of the programmes are based on extracts from the individual annual reports. Detailed information on methods, programmes and conclusions can be found in these reports. This review report is divided into two parts. The first part contains a description of the potential environmentally impacts of offshore wind farms and the potentially affected part of the environment. The second part includes a description of Horns Rev and Nysted Offshore Wind Farm and the environmental studies carried out here until the end of 2003. Appendix I is a list of the literature published on the studies carried out at Hors Rev and Nysted Offshore Wind Farm. Appendix II is a list of some of the literature relevant to the demonstration projects but not directly related to the projects. The offshore wind farm situated at the bdsand area is officially denoted Nysted Offshore Wind Farm, and in the present report the denotation 'Nysted' will be used as well when referring to Nysted Offshore Wind Farm. The denotation Roedsand will be used when referring to the actual area Roedsand. (au)

  17. Review report 2004. The Danish offshore wind farm demonstration project: Horns Rev and Nysted offshore wind farms. Environmental impact assessment and monitoring

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-10-15

    The present review report presents the two wind farms Horns Rev and Nysted with regard to environmental characteristics and the results of the environmental studies carried out in connection with the Environmental Impact Assessment (EIA) and the baseline and monitoring programmes at the two sites. The descriptions of the programmes are based on extracts from the individual annual reports. Detailed information on method, programmes and conclusions can be found in these reports (see Appendix 1). This review report is divided into two parts. The first part contains a description of the potential environmental impacts of offshore wind farms and the potentially affected part of the environment. The second part includes a description of Horns Rev and Nysted Offshore Wind Farm and the environmental studies carried out here until the end of 2003. Appendix I is a list of the literature published on the studies carried out at Horns Rev and Nysted Offshore Wind Farm. Appendix II is a list of some of the literature relevant to the demonstration projects but not directly related to the projects. The offshore wind farm situated in the Roedsand area is officially denoted Nysted Offshore Wind Farm, and in the present report the denotation 'Nysted' will be used as well when referring to Nysted Offshore Wind Farm. The denotation Roedsand will be used when referring to the actual area Roedsand. (au)

  18. Health symptoms in residents living near shale gas activity: A retrospective record review from the Environmental Health Project

    Directory of Open Access Journals (Sweden)

    Beth Weinberger

    2017-12-01

    Full Text Available Increasing evidence demonstrates an association between health symptoms and exposure to unconventional natural gas development (UNGD. The purpose of this study is to describe the health of adults in communities with intense UNGD who presented for evaluation of symptoms. Records of 135 structured health assessments conducted between February 2012 and October 2015 were reviewed retrospectively. Publicly available data were used to determine proximity to gas wells. Analysis was restricted to records of adults who lived within 1km of a well in Pennsylvania and denied employment in the gas industry (n=51. Symptoms in each record were reviewed by a physician. Symptoms that could be explained by pre-existing or concurrent conditions or social history and those that began or worsened prior to exposure were excluded. Exposure was calculated using date of well drilling within 1km. The number of symptoms/participant ranged from 0 to 19 (mean=6.2; SD=5.1. Symptoms most commonly reported were: sleep disruption, headache, throat irritation, stress or anxiety, cough, shortness of breath, sinus problems, fatigue, nausea, and wheezing. These results are consistent with findings of prior studies using self-report without physician review. In comparison, our results are strengthened by the collection of health data by a health care provider, critical review of symptoms for possible alternative causes, and confirmation of timing of exposure to unconventional natural gas well relative to symptom onset or exacerbation. Our findings confirm earlier studies and add to the growing body of evidence of the association between symptoms and exposure to UNGD. Keywords: Hydraulic fracturing, Health, Fracking, Shale gas, Unconventional gas

  19. Reviews

    Directory of Open Access Journals (Sweden)

    Philip Barker

    1998-12-01

    Full Text Available There were two copy-editing blunders in Clive Betts's review, in ALT-J 5 (3, of Shirley Fletcher's Designing Competence-Based Training, one in paragraph 2 line 1, the other in paragraph 3 line 8. The errors (the result of the Editor, Gabriel Jacobs, trying to perform a final proof of the journal at lightning speed in order to meet the printing deadline, and not of any mistake on the part of either Philip Barker or the University of Wales Press hardly affected meaning, but the fact that they appeared in a review of a book on competence makes the embarrassment all the more telling. The Editor apologizes, and thanks eagle-eyed readers. He has decided to read the book in the hope that such errors will not recur.

  20. Reviews

    Directory of Open Access Journals (Sweden)

    Wilma D'Ambrosio

    2013-12-01

    Full Text Available In the wake of the great interest raised by Maurizio Gabrieli’s review of the book Musical Networks. Parallel Distributed Perception and Performance (various authors; edited by Niall Griffith and Peter M. Todd, MA: MIT Press, Cambridge, 1999 which appeared in our last issue of Analitica, the present review section no longer follows the format used up to now but offers a survey of texts dedicated to the relationship between music analysis and technology. This decision was also made as a result of the request for more information on the subject by many of our readers. In coming issues we plan to extend this bibliography and comment on at least some of the most interesting texts published in recent years, among which we would immediately like to draw attention to the important work by Baroni, Dalmonte and Jacoboni published in 1999 (Le regole della musica. Indagine sui meccanismi della comunicazione, Torino, I Manuali EDT/SIdM, 1999.

  1. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 80. Quarterly report, July--September, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This report contains information on petroleum enhanced recovery projects. In addition to project descriptions, contract numbers, principal investigators and project management information is included.

  2. The Great British Medalists Project: A Review of Current Knowledge on the Development of the World's Best Sporting Talent.

    Science.gov (United States)

    Rees, Tim; Hardy, Lew; Güllich, Arne; Abernethy, Bruce; Côté, Jean; Woodman, Tim; Montgomery, Hugh; Laing, Stewart; Warr, Chelsea

    2016-08-01

    The literature base regarding the development of sporting talent is extensive, and includes empirical articles, reviews, position papers, academic books, governing body documents, popular books, unpublished theses and anecdotal evidence, and contains numerous models of talent development. With such a varied body of work, the task for researchers, practitioners and policy makers of generating a clear understanding of what is known and what is thought to be true regarding the development of sporting talent is particularly challenging. Drawing on a wide array of expertise, we address this challenge by avoiding adherence to any specific model or area and by providing a reasoned review across three key overarching topics: (a) the performer; (b) the environment; and (c) practice and training. Within each topic sub-section, we review and calibrate evidence by performance level of the samples. We then conclude each sub-section with a brief summary, a rating of the quality of evidence, a recommendation for practice and suggestions for future research. These serve to highlight both our current level of understanding and our level of confidence in providing practice recommendations, but also point to a need for future studies that could offer evidence regarding the complex interactions that almost certainly exist across domains.

  3. A review and assessment of variable density ground water flow effects on plume formation at UMTRA project sites

    International Nuclear Information System (INIS)

    1995-01-01

    A standard assumption when evaluating the migration of plumes in ground water is that the impacted ground water has the same density as the native ground water. Thus density is assumed to be constant, and does not influence plume migration. This assumption is valid only for water with relatively low total dissolved solids (TDS) or a low difference in TDS between water introduced from milling processes and native ground water. Analyses in the literature suggest that relatively minor density differences can significantly affect plume migration. Density differences as small as 0.3 percent are known to cause noticeable effects on the plume migration path. The primary effect of density on plume migration is deeper migration than would be expected in the arid environments typically present at Uranium Mill Tailings Remedial Action (UMTRA) Project sites, where little or no natural recharge is available to drive the plume into the aquifer. It is also possible that at some UMTRA Project sites, a synergistic affect occurred during milling operations, where the mounding created by tailings drainage (which created a downward vertical gradient) and the density contrast between the process water and native ground water acted together, driving constituents deeper into the aquifer than either process would alone. Numerical experiments were performed with the U.S. Geological Survey saturated unsaturated transport (SUTRA) model. This is a finite-element model capable of simulating the effects of variable fluid density on ground water flow and solute transport. The simulated aquifer parameters generally are representative of the Shiprock, New Mexico, UMTRA Project site where some of the highest TDS water from processing has been observed

  4. Comprehensive Summary and Analysis of Oral and Written Scoping Comments on the Hawaii Geothermal Project EIS (DOE Review Draft)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-09-18

    This report contains summaries of the oral and written comments received during the scoping process for the Hawaii Geothermal Project (HGP) Environmental Impact Statement (EIS). Oral comments were presented during public scoping meetings; written comments were solicited at the public scoping meetings and in the ''Advance Notice of Intent'' and ''Notice of Intent'' (published in the ''Federal Register'') to prepare the HGP EIS. This comprehensive summary of scoping inputs provides an overview of the issues that have been suggested for inclusion in the HGP EIS.

  5. Diabetes self-management arrangements in Europe: a realist review to facilitate a project implemented in six countries.

    Science.gov (United States)

    Kousoulis, Antonis A; Patelarou, Evridiki; Shea, Sue; Foss, Christina; Ruud Knutsen, Ingrid A; Todorova, Elka; Roukova, Poli; Portillo, Mari Carmen; Pumar-Méndez, María J; Mujika, Agurtzane; Rogers, Anne; Vassilev, Ivaylo; Serrano-Gil, Manuel; Lionis, Christos

    2014-10-02

    Self-management of long term conditions can promote quality of life whilst delivering benefits to the financing of health care systems. However, rarely are the meso-level influences, likely to be of direct relevance to these desired outcomes, systematically explored. No specific international guidelines exist suggesting the features of the most appropriate structure and organisation of health care systems within which to situate self-management approaches and practices. This review aimed to identify the quantitative literature with regard to diabetes self-management arrangements currently in place within the health care systems of six countries (The United Kingdom, The Netherlands, Norway, Spain, Bulgaria, and Greece) and explore how these are integrated into the broader health care and welfare systems in each country. The methodology for a realist review was followed. Publications of interest dating from 2000 to 2013 were identified through appropriate MeSH terms by a systematic search in six bibliographic databases. A search diary was maintained and the studies were assessed for their quality and risk of bias. Following the multi-step search strategy, 56 studies were included in the final review (the majority from the UK) reporting design methods and findings on 21 interventions and programmes for diabetes and chronic disease self-management. Most (11/21, 52%) of the interventions were designed to fit within the context of primary care. The majority (11/21, 52%) highlighted behavioural change as an important goal. Finally, some (5/21, 24%) referred explicitly to Internet-based tools. This review is based on results which are derived from a total of at least 5,500 individuals residing in the six participating countries. It indicates a policy shift towards patient-centred self-management of diabetes in a primary care context. The professional role of diabetes specialist nurses, the need for multidisciplinary approaches and a focus on patient education emerge as

  6. Scoping review and evaluation of SMS/text messaging platforms for mHealth projects or clinical interventions.

    Science.gov (United States)

    Iribarren, Sarah J; Brown, William; Giguere, Rebecca; Stone, Patricia; Schnall, Rebecca; Staggers, Nancy; Carballo-Diéguez, Alex

    2017-05-01

    Mobile technology supporting text messaging interventions (TMIs) continues to evolve, presenting challenges for researchers and healthcare professionals who need to choose software solutions to best meet their program needs. The objective of this review was to systematically identify and compare text messaging platforms and to summarize their advantages and disadvantages as described in peer-reviewed literature. A scoping review was conducted using four steps: 1) identify currently available platforms through online searches and in mHealth repositories; 2) expand evaluation criteria of an mHealth mobile messaging toolkit and integrate prior user experiences as researchers; 3) evaluate each platform's functions and features based on the expanded criteria and a vendor survey; and 4) assess the documentation of platform use in the peer-review literature. Platforms meeting inclusion criteria were assessed independently by three reviewers and discussed until consensus was reached. The PRISMA guidelines were followed to report findings. Of the 1041 potentially relevant search results, 27 platforms met inclusion criteria. Most were excluded because they were not platforms (e.g., guides, toolkits, reports, or SMS gateways). Of the 27 platforms, only 12 were identified in existing mHealth repositories, 10 from Google searches, while five were found in both. The expanded evaluation criteria included 22 items. Results indicate no uniform presentation of platform features and functions, often making these difficult to discern. Fourteen of the platforms were reported as open source, 10 focused on health care and 16 were tailored to meet needs of low resource settings (not mutually exclusive). Fifteen platforms had do-it-yourself setup (programming not required) while the remainder required coding/programming skills or setups could be built to specification by the vendor. Frequently described features included data security and access to the platform via cloud-based systems. Pay

  7. Virtual autopsy using imaging: bridging radiologic and forensic sciences. A review of the Virtopsy and similar projects

    International Nuclear Information System (INIS)

    Bolliger, Stephan A.; Thali, Michael J.; Ross, Steffen; Buck, Ursula; Naether, Silvio; Vock, Peter

    2008-01-01

    The transdisciplinary research project Virtopsy is dedicated to implementing modern imaging techniques into forensic medicine and pathology in order to augment current examination techniques or even to offer alternative methods. Our project relies on three pillars: three-dimensional (3D) surface scanning for the documentation of body surfaces, and both multislice computed tomography (MSCT) and magnetic resonance imaging (MRI) to visualise the internal body. Three-dimensional surface scanning has delivered remarkable results in the past in the 3D documentation of patterned injuries and of objects of forensic interest as well as whole crime scenes. Imaging of the interior of corpses is performed using MSCT and/or MRI. MRI, in addition, is also well suited to the examination of surviving victims of assault, especially choking, and helps visualise internal injuries not seen at external examination of the victim. Apart from the accuracy and three-dimensionality that conventional documentations lack, these techniques allow for the re-examination of the corpse and the crime scene even decades later, after burial of the corpse and liberation of the crime scene. We believe that this virtual, non-invasive or minimally invasive approach will improve forensic medicine in the near future. (orig.)

  8. Review of alternative residual contamination guides for the 324 Building B-Cell Cleanout Project. Phase 1

    International Nuclear Information System (INIS)

    Vargo, G.J.; Durham, J.S.; Brackenbush, L.W.

    1995-09-01

    This report provides a proposed residual contamination guide (RCG) for the 324 Building B-Cell Cleanout Project, Phase 1, at the Hanford Site. The RCG is expressed as a fraction of the amount of highly dispersible radioactive material that would result in offsite doses equal to the Pacific Northwest Laboratory radiological risk guidelines following the worst credible accident scenario for release of the holdup material. The proposed RCG is 10 -1 to 10 -2 of the PNL radiological risk guidelines. As part of the development of the RCG, a number of factors were considered. These include the need to provide an appropriate level of flexibility for other activities within the 324 Building that could contribute to the facility's overall radiological risk, uncertainties inherent in safety analyses, and the possible contribution of other 300 Area facilities to overall radiological risk. Because of these factors and the nature of the cleanout project, the RCG is expressed as a range rather than a point value. This report also provides guidance on determining conformance to the RCG, including inspection and measurement techniques, quality assurance requirements, and consideration of uncertainty

  9. A systematic review to determine reliability and usefulness of the field-based test batteries for the assessment of physical fitness in adolescents – The ASSO Project

    Directory of Open Access Journals (Sweden)

    Antonino Bianco

    2015-06-01

    Full Text Available The aim of the present review is to investigate the main field-based tests, used alone or included in sport or fitness batteries, for the assessment of health- and skill-related physical fitness components in adolescents. Different scientific databases were searched through using the selected key words related to physical fitness and its components for adolescence. The search focused on original articles and reviews/meta-analyses using valid, reproducible and feasible tests that fit within the school environment. A total of 100 scientific manuscripts were included in the qualitative synthesis. The present systematic review pointed out 5 fitness tests that well adapt to the evaluation of the components of physical fitness of adolescents within a school environment: the 20 m shuttle run test for cardio-respiratory endurance; the handgrip strength test for upper body maximal strength; the standing broad jump test for lower body maximal strength; the sit-up test to exhaustion for muscular endurance and the 4×10 m shuttle run test for speed, agility and coordination. These fitness tests have been finally selected and incorporated into the Adolescents and Surveillance System for the Obesity prevention – Fitness Test Battery (ASSO-FTB, and will be adopted within the ASSO Project for evaluation purposes. This instrument could be also provided to teachers and people working in schools in order to assess physical fitness of adolescents over time and prevent obesity and related diseases.

  10. A Preliminary Review of U.S. Forest Service Business Practices To Authorize Special Uses, Including Energy Infrastructure Projects, on National Forest System Lands

    Energy Technology Data Exchange (ETDEWEB)

    Wescott, K. L. [Argonne National Lab. (ANL), Argonne, IL (United States); May, J. E. [Argonne National Lab. (ANL), Argonne, IL (United States); Moore, H. R. [Argonne National Lab. (ANL), Argonne, IL (United States); Brunner, D. L. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2014-09-01

    The U.S. Forest Service (USFS) Special Uses-Lands Program is in jeopardy. Although this program, authorized in Title 36, Part 251, of the U.S. Code of Federal Regulations (36 CFR Part 251), ranks among the top four revenue-generating programs for use of National Forest System (NFS) lands, along with the Timber, Minerals, and Special Uses-Recreation Programs, the Special Uses-Lands Program is in a state of neglect. Repeated cuts in funding (a decrease of 26% from fiscal years 2010 to 2014) are adversely affecting staffing and training, which in turn is affecting timely permit processing and ultimately the public’s ability to use and benefit from NFS lands. In addition, highly experienced staff with valuable institutional knowledge of the program have begun to retire. The ability of the program to function under these dire circumstances can be attributed to the dedication of Special Uses staff to the program and their commitment to the public. The initial focus of this report was to identify opportunities for improving performance of permitting and review for large energy infrastructure-related projects. However, it became clear during this analysis that these projects are generally adequately staffed and managed. This is due in large part to the availability of cost-recovery dollars and the high-profile nature of these projects. However, it also became apparent that larger issues affecting the bulk of the work of the Special Uses-Lands Program need to be addressed immediately. This report is a preliminary examination of the state of the Special Uses-Lands Program and focuses on a few key items requiring immediate attention. Further investigation through case studies is recommended to dig deeper into the Special Uses-Lands Program business process to determine the most costeffective strategies for streamlining the overall process and the metrics by which performance can be evaluated, including for the permitting and tracking of energy infrastructure projects.

  11. The Introduction of a Full Medication Review Process in a Local Hospital: Successes and Barriers of a Pilot Project in the Geriatric Ward

    Directory of Open Access Journals (Sweden)

    Lies De Bock

    2018-02-01

    information. The communicative and non-communicative successes and hurdles encountered during this project need to be addressed in order to improve the full medication review process and to strengthen the role of the clinical pharmacist.

  12. The Jet Propulsion Laboratory Electric and Hybrid Vehicle System Research and Development Project, 1977-1984: A Review

    Science.gov (United States)

    Kurtz, D.; Roan, V.

    1985-01-01

    The JPL Electric and Hybrid Vehicle System Research and Development Project was established in the spring of 1977. Originally administered by the Energy Research and Development Administration (ERDA) and later by the Electric and Hybrid Vehicle Division of the U.S. Department of Energy (DOE), the overall Program objective was to decrease this nation's dependence on foreign petroleum sources by developing the technologies and incentives necessary to bring electric and hybrid vehicles successfully into the marketplace. The ERDA/DOE Program structure was divided into two major elements: (1) technology research and system development and (2) field demonstration and market development. The Jet Propulsion Laboratory (JPL) has been one of several field centers supporting the former Program element. In that capacity, the specific historical areas of responsibility have been: (1) Vehicle system developments (2) System integration and test (3) Supporting subsystem development (4) System assessments (5) Simulation tool development.

  13. Review of interactions between climate policy and energy safety in Europe (ELIPSE project) - Final report, December 2012

    International Nuclear Information System (INIS)

    Guivarch, Celine; Rozenberg, Julie; Vogt-Schilb, Adrien; Monjon, Stephanie

    2013-01-01

    The ELIPSE project is a better understanding of the consequences of ambitious energy policies for a secure energy in Europe. It is based on a choice of indicators for a secure energy which are related to availability and diversification, energy dependence and efficiency, energy cost for the society, and acceptability. Four RCP (representative concentration pathways) scenarios are selected. Their results are discussed, notably in terms of evolution of emissions, of evolution of the carbon tax, of carbon-tax variability, of GDP growth according to scenarios with or without climate policy, of primary energy supply with or without climate policy, of oil supply in Europe and oil prices with or without climate policy. The authors discuss the perspectives of evolution of energy security in Europe on the short, medium or long term, and the influence of different factors. They discuss the development and spreading of low carbon technologies (renewable energies, carbon capture and storage, electric vehicles)

  14. Ten Years of OpenStreetMap Project: Have We Addressed Data Quality Appropriately? – Review Paper

    Directory of Open Access Journals (Sweden)

    Maythm al-bakri

    2015-04-01

    Full Text Available It has increasingly been recognised that the future developments in geospatial data handling will centre on geospatial data on the web: Volunteered Geographic Information (VGI. The evaluation of VGI data quality, including positional and shape similarity, has become a recurrent subject in the scientific literature in the last ten years. The OpenStreetMap (OSM project is the most popular one of the leading platforms of VGI datasets. It is an online geospatial database to produce and supply free editable geospatial datasets for a worldwide. The goal of this paper is to present a comprehensive overview of the quality assurance of OSM data. In addition, the credibility of open source geospatial data is discussed, highlighting the difficulties and challenges of VGI data quality assessment. The conclusion is that for OSM dataset, it is quite difficult to control its quality. It therefore makes sense to use OSM data for applications do not need high quality spatial datasets.

  15. Seismic Safety Margins Research Program. Phase 1. Project V. Structural sub-system response: subsystem response review

    International Nuclear Information System (INIS)

    Fogelquist, J.; Kaul, M.K.; Koppe, R.; Tagart, S.W. Jr.; Thailer, H.; Uffer, R.

    1980-03-01

    This project is directed toward a portion of the Seismic Safety Margins Research Program which includes one link in the seismic methodology chain. The link addressed here is the structural subsystem dynamic response which consists of those components and systems whose behavior is often determined decoupled from the major structural response. Typically the mathematical model utilized for the major structural response will include only the mass effects of the subsystem and the main model is used to produce the support motion inputs for subsystem seismic qualification. The main questions addressed in this report have to do with the seismic response uncertainty of safety-related components or equipment whose seismic qualification is performed by (a) analysis, (b) tests, or (c) combinations of analysis and tests, and where the seismic input is assumed to have no uncertainty

  16. Projection: A Bibliography.

    Science.gov (United States)

    Pedrini, D. T.; Pedrini, Bonnie C.

    Sigmund Freud and his associates did much clinical work with the dynamic of projection, especially with regard to paranoid symptoms and syndromes. Much experimental work has also been done with projection. Sears evaluated the results of some of those studies. Murstein and Pryer sub-classified projection and reviewed typical studies. The…

  17. Reviews

    Directory of Open Access Journals (Sweden)

    Ramsey Baker

    1999-12-01

    Full Text Available This book is written from the viewpoint that learning technology, although perceived of immense value, is not being exploited to its full potential, nor are its effects on student learning fully understood. Obtaining as accurate a picture as possible in order to correctly to influence policy and practice is an activity that is rightly receiving increased attention. No one could expect a 'how to do it' book for this subject area.as outcomes (be they of learning, cost-effectiveness or of more abstract influence are dictated by a wide range of factors. Martin Oliver (from the LaTTD group at the University of North London has gathered a wide range of interesting papers (derived from the Evaluation of Learning Technologies conference, 1998 to demonstrate the diversity of approaches in this field. The book comprises some 242 pages that are arranged into 14 chapters, written by those involved in related projects.

  18. Reviews

    Science.gov (United States)

    2006-03-01

    WE RECOMMEND It’s About Time: Understanding Einstein’s Relativity An excellent novel explanation of special relativity. The Plane Factory A great way to make projects more quantitative. Spacesaver Microvoltmeter This meter is robust, portable and covers a good range of voltages. Cassell’s Laws of Nature This book covers everything that governs our physical universe. J D Bernal: The Sage of Science Awell researched biography that is hard to put down. AS-Level Physics: The Revision Guide A very good, reasonably priced revision guide. WORTH A LOOK Symmetry and the Beautiful Universe This book on modern physics is fairly readable but a bit haphazard. HANDLE WITH CARE Hover Football An inferior and cheaper version of the Kick Dis. art & science Art students will get more out of this than physics students. WEB WATCH Practicalphysics.org is an excellent site, packed with useful tips and instructions for practical physics experiments. Louisa Jones describes her favourite websites about waves

  19. An Overview of Systematic Reviews on Prognostic Factors in Neck Pain: Results from the International Collaboration on Neck Pain (ICON) Project

    Science.gov (United States)

    Walton, David M; Carroll, Linda J; Kasch, Helge; Sterling, Michele; Verhagen, Arianne P; MacDermid, Joy C; Gross, Anita; Santaguida, P. Lina; Carlesso, Lisa

    2013-01-01

    Given the challenges of chronic musculoskeletal pain and disability, establishing a clear prognosis in the acute stage has become increasingly recognized as a valuable approach to mitigate chronic problems. Neck pain represents a condition that is common, potentially disabling, and has a high rate of transition to chronic or persistent problems. As a field of research, prognosis in neck pain has stimulated several empirical primary research papers, and a number of systematic reviews. As part of the International Consensus on Neck (ICON) project, we sought to establish the general state of knowledge in the area through a structured, systematic review of systematic reviews (overview). An exhaustive search strategy was created and employed to identify the 13 systematic reviews (SRs) that served as the primary data sources for this overview. A decision algorithm for data synthesis, which incorporated currency of the SR, risk of bias assessment of the SRs using AMSTAR scoring and consistency of findings across SRs, determined the level of confidence in the risk profile of 133 different variables. The results provide high confidence that baseline neck pain intensity and baseline disability have a strong association with outcome, while angular deformities of the neck and parameters of the initiating trauma have no effect on outcome. A vast number of predictors provide low or very low confidence or inconclusive results, suggesting there is still much work to be done in this field. Despite the presence of multiple SR and this overview, there is insufficient evidence to make firm conclusions on many potential prognostic variables. This study demonstrates the challenges in conducting overviews on prognosis where clear synthesis critieria and a lack of specifics of primary data in SR are barriers. PMID:24115971

  20. Project mobilisation

    International Nuclear Information System (INIS)

    Clark, J.; Limbrick, A.

    1996-01-01

    This paper identifies and reviews the issues to be addressed and the procedures to be followed during the mobilisation of projects using LFG as an energy source. Knowledge of the procedures involved in project mobilisation, their sequence and probable timescales, is essential for efficient project management. It is assumed that the majority of projects will be situated on existing, licensed landfill sites and, in addition to complying with the relevant conditions of the waste management licence and original planning consent, any proposed developments on the site will require a separate planning consent. Experience in the UK indicates that obtaining planning permission rarely constitutes a barrier to the development of schemes for the utilisation of LFG. Even so, an appreciation of the applicable environmental and planning legislation is essential as this will enable the developer to recognise the main concerns of the relevant planning authority at an early stage of the project, resulting in the preparation of an informed and well-structured application for planning permission. For a LFG utilisation scheme on an existing landfill site, the need to carry out an environmental assessment (EA) as part of the application for planning permission will, in vitually all cases, be discretionary. Even if not deemed necessary by the planning authority, an EA is a useful tool at the planning application stage, to identify and address potential problems and to support discussions with bodies such as the Environment Agency, from whom consents or authorisations may be required. Carrying out an EA can thus provide for more cost-effective project development and enhanced environmental protection. Typically, the principal contractual arrangements, such as the purchase of gas or the sale of electricity, will have been established before the project mobilisation phase. However, there are many other contractural arrangements that must be established, and consents and permits that may be

  1. IDENTIFICANDO CONCEPCIONES DE INFANCIA: UNA MIRADA A LOS PROYECTOS EDUCATIVOS INSTITUCIONALES (IDENTIFYING INFANCY CONCEPTIONS: AN INSTITUTIONAL EDUCATION PROJECT REVIEW

    Directory of Open Access Journals (Sweden)

    Cisternas Pacheco Nicole

    2011-08-01

    Full Text Available Resumen:El presente artículo corresponde a una investigación cuyo foco alude a aquellas concepciones de infancia que construyen las escuelas. Para lo anterior, se utilizó como instrumento de análisis uno de sus dispositivos discursivos más relevantes: los Proyectos Educativos Institucionales (PEI. De esta manera, se seleccionaron 10 proyectos de escuelas de la Región Metropolitana de Chile insertas en contextos vulnerables. La metodología utilizada fue el Análisis de Discurso, a modo de identificar, a nivel textual e interpretativo, las diversas características y elementos que constituyen las nociones acerca de la infancia presentes en los discursos educativos. Las principales conclusiones que surgen de esta indagación son dos. La primera, en el plano textual vemos que la estructura de estos documentos imposibilita que aparezca la noción de infancia, que tiene como consecuencia la invisibilización del niño o la niña en el texto, pues al utilizar el formato de proyecto se privilegia la visión de futuro, los objetivos y las metas a lograr, en desmedro del proceso educativo presente. La segunda conclusión apunta al plano interpretativo, donde se aprecia que las concepciones de infancia presentes en los PEI revisados dan cuenta de tres características principales: la contradicción, porque conviven conceptos de la niñez basados en visiones contrapuestas, la invisibilización de niños y niñas en sus discursos al ser mencionados a través de categorías abstractas. Y la omisión del concepto de derechos de la infancia y carácter garante de la escuela.Abstract: The next article response to an investigation that is focus on those infancy conceptions who are build by schools itself. For this investigation, an analysis instrument was used, as one of the most relevant discursive devices: the Educative Institutional Projects (PEI for its Spanish abbreviation Hereby, 10 projects were chosen amongst schools insert in vulnerable contexts

  2. A critical review of the ESCAPE project for estimating long-term health effects of air pollution.

    Science.gov (United States)

    Lipfert, Frederick W

    2017-02-01

    The European Study of Cohorts for Air Pollution Effects (ESCAPE) is a13-nation study of long-term health effects of air pollution based on subjects pooled from up to 22 cohorts that were intended for other purposes. Twenty-five papers have been published on associations of various health endpoints with long-term exposures to NOx, NO2, traffic indicators, PM10, PM2.5 and PM constituents including absorbance (elemental carbon). Seven additional ESCAPE papers found moderate correlations (R2=0.3-0.8) between measured air quality and estimates based on land-use regression that were used; personal exposures were not considered. I found no project summaries or comparisons across papers; here I conflate the 25 ESCAPE findings in the context of other recent European epidemiology studies. Because one ESCAPE cohort contributed about half of the subjects, I consider it and the other 18 cohorts separately to compare their contributions to the combined risk estimates. I emphasize PM2.5 and confirm the published hazard ratio of 1.14 (1.04-1.26) per 10μg/m3 for all-cause mortality. The ESCAPE papers found 16 statistically significant (p<0.05) risks among the125 pollutant-endpoint combinations; 4 each for PM2.5 and PM10, 1 for PM absorbance, 5 for NO2, and 2 for traffic. No PM constituent was consistently significant. No significant associations were reported for cardiovascular mortality; low birthrate was significant for all pollutants except PM absorbance. Based on associations with PM2.5, I find large differences between all-cause death estimates and the sum of specific-cause death estimates. Scatterplots of PM2.5 mortality risks by cause show no consistency across the 18 cohorts, ostensibly because of the relatively few subjects. Overall, I find the ESCAPE project inconclusive and I question whether the efforts required to estimate exposures for small cohorts were worthwhile. I suggest that detailed studies of the large cohort using historical exposures and additional

  3. To What Extent Can Existing Research Help Project Climate Change Impacts on Biodiversity in Aquatic Environments? A Review of Methodological Approaches

    Directory of Open Access Journals (Sweden)

    Anders Forsman

    2016-11-01

    Full Text Available It is broadly accepted that continued global warming will pose a major threat to biodiversity in the 21st century. But how reliable are current projections regarding consequences of future climate change for biodiversity? To address this issue, we review the methodological approaches in published studies of how life in marine and freshwater environments responds to temperature shifts. We analyze and compare observational field surveys and experiments performed either in the laboratory or under natural conditions in the wild, the type of response variables considered, the number of species investigated, study duration, and the nature and magnitude of experimental temperature manipulations. The observed patterns indicate that, due to limitations of study design, ecological and evolutionary responses of individuals, populations, species, and ecosystems to temperature change were in many cases difficult to establish, and causal mechanism(s often remained ambiguous. We also discovered that the thermal challenge in experimental studies was 10,000 times more severe than reconstructed estimates of past and projections of future warming of the oceans, and that temperature manipulations also tended to increase in magnitude in more recent studies. These findings raise some concerns regarding the extent to which existing research can increase our understanding of how higher temperatures associated with climate change will affect life in aquatic environments. In view of our review findings, we discuss the trade-off between realism and methodological tractability. We also propose a series of suggestions and directions towards developing a scientific agenda for improving the validity and inference space of future research efforts.

  4. Vague project start makes project success of outsourced software development projects uncertain

    OpenAIRE

    Savolainen, Paula

    2010-01-01

    peer-reviewed A definition of a project success includes at least three criteria: 1) meeting planning goals, 2) customer benefits, and 3) supplier benefits. This study aims to point out the importance of the definition of the project start, the project start date, and what work should be included in the project effort in order to ensure the supplier's benefits. The ambiguity of the project start risks the profitability of the project and therefore makes project success at least from suppli...

  5. Problems of the social non-acceptance of mining projects with particular emphasis on the European Union – a literature review

    Directory of Open Access Journals (Sweden)

    Badera Jarosław

    2014-03-01

    Full Text Available Problems of the social non-acceptance of the mining industry (particularly development projects is relatively new, so more widely discussed for a relatively short time. In this paper, an extensive review of worldwide literature on this topic has been presented with special regard to the specificity of the European Union countries, where the NIMBY (Not In My Backyard phenomenon is one of the key reasons for local community opposition. The problem is recognized mainly from the perspective of the mineral industry, but also from the point of view of government, NGOs or local communities. There are case studies, publications in the range of sustainable development, corporate social responsibility, geo-ethics, proposals for new analytical methods (for example multi-criteria and others or effective solutions. The improvement in social acceptance for the mineral industry may be achieved by further development of technological, organizational and scientific methods which minimizes mining influences on the environment and society developing. Modern approach to social issues associated with mineral activity includes also strategies of bilateral communication, mediation/negotiation, cooperation between stakeholders to a larger extent then in the past. However, it is the continuous need of extensive, in-depth social debate on mineral development projects in the European Union, both in energetic and non-energetic branch.

  6. Digital image management project for dermatological health care environments: a new dedicated software and review of the literature.

    Science.gov (United States)

    Rubegni, Pietro; Nami, Niccolò; Poggiali, Sara; Tataranno, Domenico; Fimiani, M

    2009-05-01

    Because the skin is the only organ completely accessible to visual examination, digital technology has therefore attracted the attention of dermatologists for documenting, monitoring, measuring and classifying morphological manifestations. To describe a digital image management system dedicated to dermatological health care environments and to compare it with other existing softwares for digital image storage. We designed a reliable hardware structure that could ensure future scaling, because storage needs tend to grow exponentially. For the software, we chose a client-web server application based on a relational database and with a 'minimalist' user interface. We developed a software with a ready-made, adaptable index of skin pathologies. It facilitates classification by pathology, patient and visit, with an advanced search option allowing access to all images according to personalized criteria. The software also offers the possibility of comparing two or more digital images (follow-up). The fact that the archives of years of digital photos acquired and saved on PCs can easily be entered in the program distinguishes it from the others in the market. This option is fundamental for accessing all the photos taken in years of practice in the program without entering them one by one. The program is available to any user connected to the local Intranet and the system may directly be available in the future from the Internet. All clinics and surgeries, especially those that rely on digital images, are obliged to keep up with technological advances. It is therefore hoped that our project will become a model for medical structures intending to rationalise digital and other data according to statutory requirements.

  7. Review/decide and inquiry/decide. Two approaches to decision making. Report from a team syntegrity meeting. Project RISCOM

    International Nuclear Information System (INIS)

    Andersson, Kjell

    1998-01-01

    The meeting addressed the question how it is possible to make decision processes and risk assessment for deep repository development more transparent. The two dominant decision approaches used in Sweden and the UK, review/decide(r/d) and inquiry/decide(i/d), were discussed. The main conclusions from group discussions were: It was acknowledged that the concept of transparency includes three equally important aspects: factual issues, value issues, and stake holder's authenticity. There is a need in both countries to bring in the best aspects of both the r/d and the i/d approaches. Both approaches seem to offer possibilities and suffer limitations with respect to the segregation of facts, uncertainties and value judgements, and some sort of combination of the two may present a valuable development. However, neither the i/d nor the r/d approach seems to provide a good framework for clarification of the value issue. Experts have dominated the decision process in both countries. There is a need for a more genuine consultation process. The Swedish EIA is evolving in this direction. The regulator should take part in the process, also at an early stage. It is important that the integrity of the regulator is maintained. Rules and responsibilities of implementers, regulators, planning authorities and other decision-makers should be established early in the process. The public should know that they have access to a process that clarifies value judgements, facts, uncertainties and questions. It is necessary for the public to know what the technical issues are, and to have the means to evaluate the authenticity of the experts. It is important that political decisions are not taken without due consideration of scientific and technical arguments. There are factors beside safety assessments which are completely legitimate to consider. An approach with intense interaction between politicians, experts and the public is needed

  8. Review/decide and inquiry/decide. Two approaches to decision making. Report from a team syntegrity meeting. Project RISCOM

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Kjell [ed.] [Karinta-Konsult, Taeby (Sweden)

    1998-01-01

    The meeting addressed the question how it is possible to make decision processes and risk assessment for deep repository development more transparent. The two dominant decision approaches used in Sweden and the UK, review/decide(r/d) and inquiry/decide(i/d), were discussed. The main conclusions from group discussions were: It was acknowledged that the concept of transparency includes three equally important aspects: factual issues, value issues, and stake holder`s authenticity. There is a need in both countries to bring in the best aspects of both the r/d and the i/d approaches. Both approaches seem to offer possibilities and suffer limitations with respect to the segregation of facts, uncertainties and value judgements, and some sort of combination of the two may present a valuable development. However, neither the i/d nor the r/d approach seems to provide a good framework for clarification of the value issue. Experts have dominated the decision process in both countries. There is a need for a more genuine consultation process. The Swedish EIA is evolving in this direction. The regulator should take part in the process, also at an early stage. It is important that the integrity of the regulator is maintained. Rules and responsibilities of implementers, regulators, planning authorities and other decision-makers should be established early in the process. The public should know that they have access to a process that clarifies value judgements, facts, uncertainties and questions. It is necessary for the public to know what the technical issues are, and to have the means to evaluate the authenticity of the experts. It is important that political decisions are not taken without due consideration of scientific and technical arguments. There are factors beside safety assessments which are completely legitimate to consider. An approach with intense interaction between politicians, experts and the public is needed.

  9. Report of the Peer Review Panel on the early site suitability evaluation of the Potential Repository Site at Yucca Mountain, Nevada; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-01-01

    The US Department of Energy (DOE) Yucca mountain Site Characterization Project Office (YMPO) assigned Science Applications International Corporation (SAIC), the Technical and Management Support Services (T&MSS) contractor to the YmPo, the task of conducting an Early Site Suitability Evaluation (ESSE) of the Yucca mountain site as a potential site for a high-level radioactive waste repository. First, the assignment called for the development of a method to evaluate a single site against the DOE General Guidelines for Recommendation of Sites for Nuclear Waste Repositories, 10 CFR Part 960. Then, using this method, an evaluation team, the ESSE Core Team, of senior YMP scientists, engineers, and technical experts, evaluated new information obtained about the site since publication of the final Environmental Assessment (DOE, 1986) to determine if new suitability/unsuitability findings could be recommended. Finally, the Core Team identified further information and analyses needed to make final determinations for each of the guidelines. As part of the task, an independent peer review of the ESSE report has been conducted. Expertise was solicited that covered the entire spectrum of siting guidelines in 10 CFR Part 960 in order to provide a complete, in-depth critical review of the data evaluated and cited in the ESSE report, the methods used to evaluate the data, and the conclusions and recommendations offered by the report. Fourteen nationally recognized technical experts (Table 2) served on the Peer Review Panel. The comments from the Panel and the responses prepared by the ESSE Core Team, documented on formal Comment Response Forms, constitute the body of this document.

  10. What does the literature tell us about health workers' experiences of task-shifting projects in sub-Saharan Africa? A systematic, qualitative review.

    Science.gov (United States)

    Mijovic, Hana; McKnight, Jacob; English, Mike

    2016-08-01

    To review systematically, qualitative literature covering the implementation of task shifting in sub-Saharan Africa to address the growing interest in interventions of this kind. This review aims to distil the key practical findings to both guide a specific project aiming to improve the quality of neonatal care in Kenya and to contribute to the broader literature. Task-shifting programmes aim to improve access to healthcare by delegating specific tasks from higher to lower skilled health workers. Evidence suggests that task-shifting programmes in sub-Saharan Africa may improve patient outcomes, but they have also been criticised for providing fragmented, unsustainable services. This systematic review of qualitative literature summarises factors affecting implementation of task shifting and how such interventions in sub-Saharan Africa may have affected health workers' feelings about their own positions and their ability to provide care. Following literature search, a modified Critical Appraisal Skills Program (CASP) framework was used to assess quality. Thereafter, analysis adopted a thematic synthesis approach. A systematic literature search identified qualitative studies examining task -shifting interventions in sub-Saharan Africa. Thematic synthesis was used to identify overarching themes arising from across the studies and infer how task-shifting interventions may impact on the health workers from whom tasks are being shifted. From the 230 studies screened, 13 met the inclusion criteria. Overarching themes identified showed that task shifting has been associated with jurisdictional debates linked to new cadres working beyond their scope of practice, and tension around compensation and career development for those taking on tasks that were being delegated. Based on the qualitative data available, it appears that task shifting may negatively impact the sense of agency and the ability to perform of health workers' from whom tasks are shifted. The potential

  11. The Supply of Medical Radioisotopes. 2016 Medical Isotope Supply Review: 99Mo/99mTc Market Demand and Production Capacity Projection 2016-2021

    International Nuclear Information System (INIS)

    Charlton, Kevin; )

    2016-03-01

    Medical diagnostic imaging techniques using technetium-99m ( 99 mTc) account for approximately 80% of all nuclear medicine procedures, representing 30-40 million examinations Worldwide every year. Disruptions in the supply chain of these medical isotopes - which have half-lives of 66 hours for molybdenum-99 ( 99 Mo) and only 6 hours for 99m Tc, and thus must be produced continuously - can lead to cancellations or delays in important medical testing services. Supply reliability has been challenged over the past decade due to unexpected shutdowns and extended refurbishment periods at some of the 99 Mo-producing research reactors and processing facilities. These shutdowns have at times created conditions for extended global supply shortages (e.g. 2009-2010). At the request of its member countries, the Nuclear Energy Agency (NEA) became involved in global efforts to ensure a secure supply of 99 Mo/ 99m Tc. Since June 2009, the NEA and its High-level Group on the Security of Supply of Medical Radioisotopes (HLG-MR) have examined the causes of supply shortages and developed a policy approach, including principles and supporting recommendations to address those causes. The NEA has also reviewed the global 99 Mo supply situation periodically, to highlight periods of potential reduced supply and to underscore the case for implementing the HLG-MR policy approach in a timely and globally consistent manner. In 2012, the NEA released a 99 Mo supply and demand forecast up to 2030, identifying periods of potential low supply relative to demand. That 2012 forecast was updated with a report in 2014 that focused on the much shorter 2015-2020 period. That report was updated in 2015 with a report, '2015 Medical Isotope Supply Review: 99 Mo/ 99m Tc Market Demand and Production Capacity Projection 2015-2020' (NEA, 2015), which focused on the same period. This report updates the 2015 report, and focuses on the important 2016-2021 period. At the end of 2015, the OSIRIS reactor

  12. Managemant of NASA's major projects

    Science.gov (United States)

    James, L. B.

    1973-01-01

    Approaches used to manage major projects are studied and the existing documents on NASA management are reviewed. The work consists of: (1) the project manager's role, (2) request for proposal, (3) project plan, (4) management information system, (5) project organizational thinking, (6) management disciplines, (7) important decisions, and (8) low cost approach.

  13. Preliminary preview for a geographic and monitoring program project; a review of point source-nonpoint source effluent trading/offset systems in watersheds

    Science.gov (United States)

    Wood, Alexander Warren; Bernknopf, Richard L.

    2003-01-01

    Watershed-based trading and offset systems are being developed to improve policy-maker?s and regulator?s ability to assess nonpoint source impacts in watersheds and to evaluate the efficacy of using market-incentive programs for preserving environmental quality. An overview of the history of successful and failed trading programs throughout the United States suggests that certain political, economic, and scientific conditions within a temporal and spatial setting help meet water quality standards. The current lack of spontaneous trading among dischargers does not mean that a marketable permit trading system is an inherently inefficient regulatory approach. Rather, its infrequent use is the result of institutional and informational barriers. Improving and refining the earth science information and technologies may help determine whether trading is a suitable policy for improving water quality. However, it is debatable whether or not environmental information is the limiting factor. This paper reviews additional factors affecting the potential for instituting a trading policy. The motivation for investigating and reviewing the history of offsets and trading was inspired by a project in the preliminary stages being developed by U.S. Geological Survey Western Geographic Science Center and the Environmental Protection Agency Region IX. An offset feasibility study will be an integrated, map-based approach that incorporates environmental, economic, and statistical information to investigate the potential for using offsets to meet mercury Total Maximum Daily Loads in the Sacramento River watershed. A regional water-quality offset program is being studied that may help known point sources reduce mercury loading more cost effectively by the remediation of abandoned mines or other diffuse sources as opposed to more costly treatment at their own sites. An efficient offset program requires both a scientific basis and methods to translate that science into a regulatory decision

  14. Map projections cartographic information systems

    CERN Document Server

    Grafarend, Erik W; Syffus, Rainer

    2014-01-01

    This book offers a timely review of map projections including sphere, ellipsoid, rotational surfaces, and geodetic datum transformations. Coverage includes computer vision, and remote sensing space projective mappings in photogrammetry.

  15. MANAGING MULTICULTURAL PROJECT TEAMS

    Directory of Open Access Journals (Sweden)

    Cezar SCARLAT

    2014-06-01

    Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.

  16. Spinning cylinder experiments SC-I and SC-II: A review of results and analyses provided to the FALSIRE project

    International Nuclear Information System (INIS)

    Morland, E.; Sherry, A.H.

    1993-01-01

    A series of six large-scale experiments have been carried out at AEA Technology using the Spinning Cylinder test facility. Results from two of those experiments (SC-I and SC-II) have been provided to Project FALSIRE and are reviewed in this paper. The Spinning Cylinder tests were carried out using hollow cylinders of 1.4m outer diameter, 0.2m wall thickness and 1.3m length, containing full-length axial defects and fabricated from a modified A508 Class 3 steel. The first Spinning Cylinder test (SC-I) was an investigation of stable ductile growth induced via mechanical (primary) loading and under conditions of contained yielding. Mechanical loading was provided in the hoop direction by rotating the cylinder about its major axis within an enclosed oven. The second test (SC-II) investigated stable ductile growth under severe thermal shock (secondary) loading again under conditions of contained yielding. In this case thermal shock was produced by spraying cold water on the inside surface of the heated cylinder whilst it was rotating. For each experiment, results are presented in terms of a number of variables, eg. crack growth, temperature, stress, strain and applied K and J. In addition, an overview of the analyses of the FALSIRE Phase-1 report is also presented with respect to test SC-I and SC-II. 4 refs., 14 figs., 13 tabs

  17. BOOK REVIEW: ADRENALINE JUNKIES AND TEMPLATE ZOMBIES Understanding Patterns of Project Behavior by Tom Demarco, Peter Hruschka, Tim Lister, Steve McMenamin, James Robertson, Suzanne Robertson

    Directory of Open Access Journals (Sweden)

    DR. KADIR ALPASLAN DEMIR

    2016-10-01

    Full Text Available Today, armed forces are in continuous transformation. As new technologies are developed and new principles of war are introduced, the ministries of defenses and armed forces have to adapt to this changing environment. Almost every day, military officials start new projects to handle the technological and cultural transformations in the military. Project management became an integral part of defense development and management. Today, all high or middle level military officials are either a project sponsor overseeing a project, or a project manager executing a project, or a member of project team helping the project to become a reality. As a result, project management skills became an essential part of skillset that a military official need to successfully execute his/her duties.

  18. BC Hydro - IPC review : report on the creation of IPC International Power Corporation and its joint venture with the British Columbia Hydro and Power Authority for the Raiwind power project

    International Nuclear Information System (INIS)

    1997-03-01

    BC Hydro is one of the sponsors involved in the construction of a thermal electric power plant in Raiwind, Pakistan. As a Crown corporation, BC Hydro and its participation in the project is subject to the policies and priorities of the provincial government. This document describes the circumstances surrounding the creation of the International Power Corporation (IPC) and its joint venture with BC Hydro for the development of international power projects including the Raiwind project. The project has provoked much public discussion in British Columbia because of the involvement of Cayman Island companies in the project structure. There is concern with the intermingling of public and private interests in the project, including allegations that an IPC share offering benefited insiders of government and BC Hydro. A description of the history and structure of the Raiwind project and detailed information on the British Columbia participants is provided. Directors and shareholders of the principal corporate participants are listed. The development process in Pakistan, the key features of the project and the underlying agreements among the participants are described. An assessment of potential conflicts of interest and a review of public sector standards and guidelines regarding conflicts of interest is presented. 60 refs., 39 tabs., 6 figs

  19. Private Water Projects

    OpenAIRE

    Izaguirre, Ada Karina; Hunt, Catherine

    2005-01-01

    Drawing on the World Bank's Private Participation in Infrastructure Project Database, this Note reviews developments in the water and sewerage sector of developing countries in 2004 and changes in private participation in the sector since 2001. Data for 2004 show that total investment in water and sewerage projects with private participation amounted to nearly US$2 billion. Recent private ...

  20. Project Notes

    Science.gov (United States)

    School Science Review, 1978

    1978-01-01

    Presents sixteen project notes developed by pupils of Chipping Norton School and Bristol Grammar School, in the United Kingdom. These Projects include eight biology A-level projects and eight Chemistry A-level projects. (HM)

  1. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  2. Development and field evaluation of animal feed supplementation packages. Proceedings of the final review meeting of an IAEA Technical Co-operation Regional AFRA Project

    International Nuclear Information System (INIS)

    2002-06-01

    evaluate reproductive performance in animals that are subjected to different feed supplementation strategies. It was, however, realised that this technique has potential to monitor and improve existing support services to livestock farmers such as artificial insemination and to introduce new services such as early diagnosis of non-pregnancy and infertility. In order to ensure future sustainability of the RIA for use in such applications, the work on the second component has now been taken under a new project (RAF/5/046). This publication contains the results presented by the scientists of National Agricultural Research Systems of African countries who participated in the Final Review meeting held in Cairo, Egypt from 25 to 29 November 2000, which dealt with only the nutrition component, Development and Field Evaluation of Feed Supplementation Strategies. This publication also contains some selected papers presented at the National Training Workshop on Field Evaluation and Development of the Dry Season Feed Supplementation Packages for Ruminant Animals in the Traditional Smallholder Farms organized with financial assistance from the IAEA, from 25 to 29 July 1999, in Lusaka, Zambia

  3. What did the Go4Health policy research project contribute to the policy discourse on the sustainable development goals? A reflexive review.

    Science.gov (United States)

    Te, Vannarath; Floden, Nadia; Hussain, Sameera; Brolan, Claire E; Hill, Peter S

    2018-05-16

    In 2012, the European Commission funded Go4Health-Goals and Governance for Global Health, a consortium of 13 academic research and human rights institutions from both Global North and South-to track the evolution of the Sustainable Development Goals (SDGs), and provide ongoing policy advice. This paper reviews the research outputs published between 2012 and 2016, analyzing the thematic content of the publications, and the influence on global health and development discourse through citation metrics. Analysis of the 54 published papers showed 6 dominant themes related to the SDGs: the formulation process for the SDG health goal; the right to health; Universal Health Coverage; voices of marginalized peoples; global health governance; and the integration of health across the other SDGs. The papers combined advocacy---particularly for the right to health and its potential embodiment in Universal Health Coverage-with qualitative research and analysis of policy and stakeholders. Go4Health's publications on the right to health, global health governance and the voices of marginalized peoples in relation to the SDGs represented a substantial proportion of papers published for these topics. Go4Health analysis of the right to health clarified its elements and their application to Universal Health Coverage, global health governance, financing the SDGs and access to medicines. Qualitative research identified correspondence between perceptions of marginalized peoples and right to health principles, and reluctance among multilateral organizations to explicitly represent the right to health in the goals, despite their acknowledgement of their importance. Citation metrics analysis confirmed an average of 5.5 citations per paper, with a field-weighted citation impact of 2.24 for the 43 peer reviewed publications. Citations in the academic literature and UN policy documents confirmed the impact of Go4Health on the global discourse around the SDGs, but within the Go4Health consortium

  4. Towards a greater understanding of the illicit tobacco trade in Europe: a review of the PMI funded ‘Project Star’ report

    Science.gov (United States)

    Gilmore, Anna B; Rowell, Andy; Gallus, Silvano; Lugo, Alessandra; Joossens, Luk; Sims, Michelle

    2014-01-01

    Background Following a legal agreement with the European Union (EU), Philip Morris International (PMI) commissions a yearly report (‘Project Star’, PS) on the European illicit cigarette trade from KPMG, the global accountancy firm. Methods Review of PS 2010 report. Comparison with data from independent sources including a 2010 pan-European survey (N=18 056). Findings Within PS, data covering all 27 EU countries are entered into a model. While the model itself seems appropriate, concerns are identified with the methodologies underlying the data inputs and thus their quality: there is little transparency over methodologies; interview data underestimate legal non-domestic product partly by failing to account for legal cross-border sales; illicit cigarette estimates rely on tobacco industry empty pack surveys which may overestimate illicit; and there is an over-reliance on data supplied by PMI with inadequate external validation. Thus, PMI sales data are validated using PMI smoking prevalence estimates, yet PMI is unable to provide sales (shipment) data for the Greek islands and its prevalence estimates differ grossly from independent data. Consequently, comparisons with independent data suggest PS will tend to overestimate illicit cigarette levels particularly where cross-border shopping is frequent (Austria, Finland, France) and in Western compared with Eastern European countries. The model also provides data on the nature of the illicit cigarette market independent of seizure data suggesting that almost a quarter of the illicit cigarette market in 2010 comprised PMI's own brands compared with just 5% counterfeited PMI brands; a finding hidden in PMI's public representation of the data. Conclusions PS overestimates illicit cigarette levels in some European countries and suggests PMI's supply chain control is inadequate. Its publication serves the interests of PMI over those of the EU and its member states. PS requires greater transparency, external scrutiny and

  5. The Supply of Medical Radioisotopes. 2015 Medical Isotope Supply Review: 99Mo/99mTc Market Demand and Production Capacity Projection 2015-2020

    International Nuclear Information System (INIS)

    Charlton, Kevin; )

    2015-08-01

    Medical diagnostic imaging techniques using technetium-99m ( 99m Tc) account for approximately 80% of all nuclear medicine procedures, representing 30-40 million examinations Worldwide every year. Disruptions in the supply chain of these medical isotopes - which have half-lives of 66 hours for molybdenum-99 ( 99 Mo) and only 6 hours for 99m Tc, and thus must be produced continuously - can lead to cancellations or delays in important medical testing services. Unfortunately, supply reliability has been challenged over the past decade due to unexpected shutdowns and extended refurbishment periods at some of the mostly ageing, 99 Mo-producing research reactors and processing facilities. These shutdowns have at times created conditions for extended global supply shortages (e.g. 2009-2010). At the request of its member countries, the Nuclear Energy Agency (NEA) became involved in global efforts to ensure a secure supply of 99 Mo/ 99m Tc. Since June 2009, the NEA and its High-level Group on the Security of Supply of Medical Radioisotopes (HLG-MR) have examined the causes of supply shortages and developed a policy approach, including principles and supporting recommendations to address those causes. The NEA has also reviewed the global 99 Mo supply situation periodically, using the most up-to-date data available from supply chain participants, to highlight periods of potential reduced supply and to underscore the case for implementing the HLG-MR policy approach in a timely and globally consistent manner. In 2012, the NEA released a M o supply and demand forecast up to 2030, identifying periods of potential low supply relative to demand. That 2012 forecast was updated with a report 'Medical Isotope Supply in the Future: Production Capacity and Demand Forecast for the 99 Mo/ 99m Tc Market 2015-2020' (NEA, 2014) in 2014 that focused on the much shorter 2015-2020 period. This report updates the 2014 report, and continues to focus on the potentially critical 2015

  6. Pitfalls and major issues in the histologic diagnosis of peripheral T-cell lymphomas: results of the central review of 573 cases from the T-Cell Project, an international, cooperative study.

    Science.gov (United States)

    Bellei, Monica; Sabattini, Elena; Pesce, Emanuela Anna; Ko, Young-Hyeh; Kim, Won Seog; Cabrera, Maria Elena; Martinez, Virginia; Dlouhy, Ivan; Paes, Roberto Pinto; Barrese, Tomas; Vassallo, Josè; Tarantino, Vittoria; Vose, Julie; Weisenburger, Dennis; Rüdiger, Thomas; Federico, Massimo; Pileri, Stefano

    2017-12-01

    Peripheral T-cell lymphomas (PTCLs) comprise a heterogeneous group of neoplasms that are derived from post-thymic lymphoid cells at different stages of differentiation with different morphological patterns, phenotypes and clinical presentations. PTCLs are highly diverse, reflecting the diverse cells from which they can originate and are currently sub-classified using World Health Organization (WHO) 2008 criteria. In 2006 the International T-Cell Lymphoma Project launched the T-Cell Project, building on the retrospective study previously carried on by the network, with the aim to prospectively collect accurate data to improve knowledge on this group of lymphomas. Based on previously published reports from International Study Groups it emerged that rendering a correct classification of PTCLs is quite difficult because the relatively low prevalence of these diseases results in a lack of confidence by most pathologists. This is the reason why the T-Cell Project requested the availability of diagnostic material from the initial biopsy of each patient registered in the study in order to have the initial diagnosis centrally reviewed by expert hematopathologists. In the present report the results of the review process performed on 573 cases are presented. Overall, an incorrect diagnosis was centrally recorded in 13.1% cases, including 8.5% cases centrally reclassified with a subtype eligible for the project and 4.6% cases misclassified and found to be disorders other than T-cell lymphomas; 2.1% cases were centrally classified as T-Cell disorders not included in the study population. Thus, the T-Cell Project confirmed the difficulties in providing an accurate classification when a diagnosis of PTCLs is suspected, singled out the major pitfalls that can bias a correct histologic categorization and confirmed that a centralized expert review with the application of adequate diagnostic algorithms is mandatory when dealing with these tumours. Copyright © 2016 John Wiley & Sons

  7. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 82, quarterly report, January--March 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    This document consists of a list of projects supporting work on oil recovery programs. A publications list and index of companies and institutions is provided. The remaining portion of the document provides brief descriptions on projects in chemical flooding, gas displacement, thermal recovery, geoscience, resource assessment, and reservoir class field demonstrations.

  8. Openness in participation, assessment, and policy making upon issues of environment and environmental health: a review of literature and recent project results.

    Science.gov (United States)

    Pohjola, Mikko V; Tuomisto, Jouni T

    2011-06-16

    Issues of environment and environmental health involve multiple interests regarding e.g. political, societal, economical, and public concerns represented by different kinds of organizations and individuals. Not surprisingly, stakeholder and public participation has become a major issue in environmental and environmental health policy and assessment. The need for participation has been discussed and reasoned by many, including environmental legislators around the world. In principle, participation is generally considered as desirable and the focus of most scholars and practitioners is on carrying out participation, and making participation more effective. In practice also doubts regarding the effectiveness and importance of participation exist among policy makers, assessors, and public, leading even to undermining participatory practices in policy making and assessment.There are many possible purposes for participation, and different possible models of interaction between assessment and policy. A solid conceptual understanding of the interrelations between participation, assessment, and policy making is necessary in order to design and implement effective participatory practices. In this paper we ask, do current common conceptions of assessment, policy making and participation provide a sufficient framework for achieving effective participation? This question is addresses by reviewing the range of approaches to participation in assessment and policy making upon issues of environment and environmental health and some related insights from recent research projects, INTARESE and BENERIS.Openness, considered e.g. in terms of a) scope of participation, b) access to information, c) scope of contribution, d) timing of openness, and e) impact of contribution, provides a new perspective to the relationships between participation, assessment and policy making. Participation, assessment, and policy making form an inherently intertwined complex with interrelated objectives and

  9. Photovoltaic demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Kaut, W [Commission of the European Communities, Brussels (Belgium); Gillett, W B; Hacker, R J [Halcrow Gilbert Associates Ltd., Swindon (GB)

    1992-12-31

    This publication, comprising the proceedings of the fifth contractor`s meeting organized by the Commission of the European Communities, Directorate-General for Energy, provides an overview of the photovoltaic demonstration projects which have been supported in the framework of the energy demonstration programme since 1983. It includes reports by each of the contractors who submitted proposals in 1987 and 1988, describing progress within their projects. Projects accepted from earlier calls for proposals and not yet completed were reviewed by a rapporteur and are discussed in the summary section. The results of the performance monitoring of all projects and the lessons drawn from the practical experience of the projects are also presented in the summaries and conclusions. Contractors whose projects were submitted in 1989 were also present at the meeting and contributed to the reported discussions. This proceeding is divided into four sessions (General, Housing, technical presentations, other applications) and 24 papers are offered.

  10. Define Project

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas

    2005-01-01

    "Project" is a key concept in IS management. The word is frequently used in textbooks and standards. Yet we seldom find a precise definition of the concept. This paper discusses how to define the concept of a project. The proposed definition covers both heavily formalized projects and informally...... organized, agile projects. Based on the proposed definition popular existing definitions are discussed....

  11. Project Management

    DEFF Research Database (Denmark)

    Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015.......Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015....

  12. New Source Review (NSR) Air Permitting and Energy Efficiency for Industrial Projects, IECA Manufacturers for Energy Efficiency Coalition Meeting (Presentation) – April 18, 2012

    Science.gov (United States)

    This presentation provides information about major new source review (NSR), including recent improvement changes and court rulings, flexible air permits rule, significant deterioration rules, and energy efficiency considerations.

  13. MO-DE-201-03: This course presents a review of radiologic anatomy and physiology as it applies to projection radiography, fluoroscopy, CT, MRI, U/S, and nuclear medicine

    International Nuclear Information System (INIS)

    Fahey, F.

    2015-01-01

    Fundamental knowledge of radiologic anatomy and physiology is critical for medical physicists. Many physicists are exposed to this topic only in graduate school, and knowledge is seldom formally evaluated or assessed after Part I of the ABR exam. Successful interactions with clinicians, including surgeons, radiologists, and oncologists requires that the medical physicist possess this knowledge. This course presents a review of radiologic anatomy and physiology as it applies to projection radiography, fluoroscopy, CT, MRI, U/S, and nuclear medicine. We will review structural anatomy, manipulation of tissue contrast, the marriage between anatomy and physiology, and explore how medical imaging exploits normal and pathological processes in the body to generate contrast. Learning Objectives: Review radiologic anatomy. Examine techniques to manipulate tissue contrast in radiology. Integrate anatomy and physiology in molecular imaging

  14. MO-DE-201-03: This course presents a review of radiologic anatomy and physiology as it applies to projection radiography, fluoroscopy, CT, MRI, U/S, and nuclear medicine

    Energy Technology Data Exchange (ETDEWEB)

    Fahey, F.

    2015-06-15

    Fundamental knowledge of radiologic anatomy and physiology is critical for medical physicists. Many physicists are exposed to this topic only in graduate school, and knowledge is seldom formally evaluated or assessed after Part I of the ABR exam. Successful interactions with clinicians, including surgeons, radiologists, and oncologists requires that the medical physicist possess this knowledge. This course presents a review of radiologic anatomy and physiology as it applies to projection radiography, fluoroscopy, CT, MRI, U/S, and nuclear medicine. We will review structural anatomy, manipulation of tissue contrast, the marriage between anatomy and physiology, and explore how medical imaging exploits normal and pathological processes in the body to generate contrast. Learning Objectives: Review radiologic anatomy. Examine techniques to manipulate tissue contrast in radiology. Integrate anatomy and physiology in molecular imaging.

  15. Project financing

    International Nuclear Information System (INIS)

    Cowan, A.

    1998-01-01

    Project financing was defined ('where a lender to a specific project has recourse only to the cash flow and assets of that project for repayment and security respectively') and its attributes were described. Project financing was said to be particularly well suited to power, pipeline, mining, telecommunications, petro-chemicals, road construction, and oil and gas projects, i.e. large infrastructure projects that are difficult to fund on-balance sheet, where the risk profile of a project does not fit the corporation's risk appetite, or where higher leverage is required. Sources of project financing were identified. The need to analyze and mitigate risks, and being aware that lenders always take a conservative view and gravitate towards the lowest common denominator, were considered the key to success in obtaining project financing funds. TransAlta Corporation's project financing experiences were used to illustrate the potential of this source of financing

  16. Project descriptions

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    This part specifies the activities and project tasks of each project broken down according to types of financing, listing the current projects Lw 1 through 3 funded by long-term provisions (budget), the current projects LB 1 and 2, LG 1 through 5, LK1, LM1, and LU 1 through 6 financed from special funds, and the planned projects ZG 1 through 4 and ZU 1, also financed from special funds. (DG) [de

  17. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  18. Review by a local medical research ethics committee of the conduct of approved research projects, by examination of patients' case notes, consent forms, and research records and by interview.

    Science.gov (United States)

    Smith, T; Moore, E J; Tunstall-Pedoe, H

    1997-05-31

    To monitor the conduct of medical research projects that have already been approved by the local medical research ethics committee. Follow up study of ethically approved studies (randomly selected from all the studies approved in the previous year) by examination of patients' case notes, consent forms, and research records and by interview of the researchers at their workplace. Tayside, Scotland (mixed rural and urban population). 30 research projects approved by Tayside local medical research ethics committee. Adherence to the agreed protocol, particularly for recruitment (obtaining and recording informed consent) and for specific requirements of the ethics committee, including notification of changes to the protocol and of adverse events. In one project only oral consent had been obtained, and in a quarter of the studies one or more consent forms were incorrectly completed. Inadequate filing of case notes in five studies and of consent forms in six made them unavailable for scrutiny. Adverse events were reported, but there was a general failure to report the abandoning or non-starting of projects in two studies the investigators failed to notify a change in the responsible researcher. Monitoring of medical research by local medical research ethics committees promotes and preserves ethical standards, protects subjects and researchers, discourages fraud, and has the support of investigators. We recommend that 10% of projects should undergo on-site review, with all others monitored by questionnaire. This would require about six person hours of time and a salary bill of 120 pounds per study monitored.

  19. Retrospective Review of Student Research Projects in a Canadian Master of Science in Physical Therapy Programme and the Perceived Impact on Advisors' Research Capacity, Education, Clinical Practice, Knowledge Translation, and Health Policy.

    Science.gov (United States)

    Lacey, Courtney; Scodras, Stephanie; Ardron, Julie; Sellan, Ryan; Garbaczewska, Martyna; O'Brien, Kelly K; Salbach, Nancy M

    2018-01-01

    Purpose: This study's aim was to characterize the nature of students' research conducted for a Master of Science in Physical Therapy (MScPT) degree programme at a Canadian university and evaluate the lead advisors' perspectives of its impact on their research capacity, education, clinical practice, knowledge translation, and health policy. Methods: We conducted a quantitative, cross-sectional, retrospective review of research reports from 2003 to 2014 to characterize the MScPT students' research and a quantitative, cross-sectional e-survey of lead research advisors to evaluate the impact of this research. Results: Data were abstracted from reports of 201 research projects completed between 2003 and 2014. Projects were conducted primarily in university-affiliated hospitals (41.6%) or the university's physical therapy department (41.1%), and the majority (52.5%) had a clinical focus. Of the 95 lead advisors of 201 projects, 59 advisors (response rate 62.1%) of 119 projects completed the survey questionnaire. The respondents most frequently identified clinical practice (45.1%) and advisors' research capacity (31.4%) as areas positively affected by the students' research. Conclusions: The MScPT students' research projects facilitate the conduct of extensive research internally and across affiliated hospitals. This research appears to advance not only clinical practice but also the ability of lead advisors to undertake research.

  20. Barakah Project in UAE

    Energy Technology Data Exchange (ETDEWEB)

    Petrunik, K. [Emirates Nuclear Energy Corp., Abu Dhabi (United Arab Emirates)

    2014-07-01

    This paper reviews the Barakah Project in United Arab Emirates (UAE). Development of UAE nuclear power plant programme is proceeding and construction is well under way. Nuclear energy is a compelling solution to energy demand in the UAE. Economics, environment, energy security, diversification and industrial development are the key drivers of this program. The project continues ro meet construction milestones, capacity building and training on UAE Nationals.

  1. The Bruce nuclear project

    International Nuclear Information System (INIS)

    Rose, J.B.

    1981-01-01

    This case study assesses the industrial relations impact of the construction of the Bruce Nuclear Power Development. It examines the labour relations system in the Ontario electric power sector and in major building construction. Industrial relations problems and practices at the Bruce project are reviewed. The focus of the study is on the relationship between the project and the rest of the Ontario industrial construction industry

  2. HUMN project initiative and review of validation, quality control and prospects for further development of automated micronucleus assays using image cytometry systems

    Czech Academy of Sciences Publication Activity Database

    Fenech, M.; Kirsch-Volders, M.; Rössnerová, Andrea; Šrám, Radim; Romm, H.; Bolognesi, C.; Ramakumar, A.; Soussaline, F.; Schunck, CH.; Elhajouji, A.; Anwar, W.; Bonassi, S.

    2013-01-01

    Roč. 216, č. 5 (2013), s. 541-552 ISSN 1438-4639 R&D Projects: GA ČR GAP503/11/0084 Grant - others:Project NewGenesis(XE) FOOD -CT-2005-016320 Institutional support: RVO:68378041 Keywords : Micronucleus * Cytokinesis-block * Automation Subject RIV: DN - Health Impact of the Environment Quality Impact factor: 3.276, year: 2013

  3. Project studies

    DEFF Research Database (Denmark)

    Geraldi, Joana; Söderlund, Jonas

    2018-01-01

    Project organising is a growing field of scholarly inquiry and management practice. In recent years, two important developments have influenced this field: (1) the study and practice of projects have extended their level of analysis from mainly focussing on individual projects to focussing on micro......, and of the explanations of project practices they could offer. To discuss avenues for future research on projects and project practice, this paper suggests the notion of project studies to better grasp the status of our field. We combine these two sets of ideas to analyse the status and future options for advancing...... project research: (1) levels of analysis; and (2) type of research. Analysing recent developments within project studies, we observe the emergence of what we refer to as type 3 research, which reconciles the need for theoretical development and engagement with practice. Type 3 research suggests pragmatic...

  4. Magnitude, temporal trends, and projections of the global prevalence of blindness and distance and near vision impairment: a systematic review and meta-analysis.

    Science.gov (United States)

    Bourne, Rupert R A; Flaxman, Seth R; Braithwaite, Tasanee; Cicinelli, Maria V; Das, Aditi; Jonas, Jost B; Keeffe, Jill; Kempen, John H; Leasher, Janet; Limburg, Hans; Naidoo, Kovin; Pesudovs, Konrad; Resnikoff, Serge; Silvester, Alex; Stevens, Gretchen A; Tahhan, Nina; Wong, Tien Y; Taylor, Hugh R

    2017-09-01

    Global and regional prevalence estimates for blindness and vision impairment are important for the development of public health policies. We aimed to provide global estimates, trends, and projections of global blindness and vision impairment. We did a systematic review and meta-analysis of population-based datasets relevant to global vision impairment and blindness that were published between 1980 and 2015. We fitted hierarchical models to estimate the prevalence (by age, country, and sex), in 2015, of mild visual impairment (presenting visual acuity worse than 6/12 to 6/18 inclusive), moderate to severe visual impairment (presenting visual acuity worse than 6/18 to 3/60 inclusive), blindness (presenting visual acuity worse than 3/60), and functional presbyopia (defined as presenting near vision worse than N6 or N8 at 40 cm when best-corrected distance visual acuity was better than 6/12). Globally, of the 7·33 billion people alive in 2015, an estimated 36·0 million (80% uncertainty interval [UI] 12·9-65·4) were blind (crude prevalence 0·48%; 80% UI 0·17-0·87; 56% female), 216·6 million (80% UI 98·5-359·1) people had moderate to severe visual impairment (2·95%, 80% UI 1·34-4·89; 55% female), and 188·5 million (80% UI 64·5-350·2) had mild visual impairment (2·57%, 80% UI 0·88-4·77; 54% female). Functional presbyopia affected an estimated 1094·7 million (80% UI 581·1-1686·5) people aged 35 years and older, with 666·7 million (80% UI 364·9-997·6) being aged 50 years or older. The estimated number of blind people increased by 17·6%, from 30·6 million (80% UI 9·9-57·3) in 1990 to 36·0 million (80% UI 12·9-65·4) in 2015. This change was attributable to three factors, namely an increase because of population growth (38·4%), population ageing after accounting for population growth (34·6%), and reduction in age-specific prevalence (-36·7%). The number of people with moderate and severe visual impairment also increased, from 159·9 million

  5. Integrated approaches to improve birth outcomes: perinatal periods of risk, infant mortality review, and the Los Angeles Mommy and Baby Project.

    Science.gov (United States)

    Chao, Shin Margaret; Donatoni, Giannina; Bemis, Cathleen; Donovan, Kevin; Harding, Cynthia; Davenport, Deborah; Gilbert, Carol; Kasehagen, Laurin; Peck, Magda G

    2010-11-01

    This article provides an example of how Perinatal Periods of Risk (PPOR) can provide a framework and offer analytic methods that move communities to productive action to address infant mortality. Between 1999 and 2002, the infant mortality rate in the Antelope Valley region of Los Angeles County increased from 5.0 to 10.6 per 1,000 live births. Of particular concern, infant mortality among African Americans in the Antelope Valley rose from 11.0 per 1,000 live births (7 cases) in 1999 to 32.7 per 1,000 live births (27 cases) in 2002. In response, the Los Angeles County Department of Public Health, Maternal, Child, and Adolescent Health Programs partnered with a community task force to develop an action plan to address the issue. Three stages of the PPOR approach were used: (1) Assuring Readiness; (2) Data and Assessment, which included: (a) Using 2002 vital records to identify areas with the highest excess rates of feto-infant mortality (Phase 1 PPOR), and (b) Implementing Infant Mortality Review (IMR) and the Los Angeles Mommy and Baby (LAMB) Project, a population-based study to identify potential factors associated with adverse birth outcomes. (Phase 2 PPOR); and (3) Strategy and Planning, to develop strategic actions for targeted prevention. A description of stakeholders' commitments to improve birth outcomes and monitor infant mortality is also given. The Antelope Valley community was engaged and ready to investigate the local rise in infant mortality. Phase 1 PPOR analysis identified Maternal Health/Prematurity and Infant Health as the most important periods of risk for further investigation and potential intervention. During the Phase 2 PPOR analyses, IMR found a significant proportion of mothers with previous fetal loss (45%) or low birth weight/preterm (LBW/PT) birth, late prenatal care (39%), maternal infections (47%), and infant safety issues (21%). After adjusting for potential confounders (maternal age, race, education level, and marital status), the

  6. Virtual projects

    DEFF Research Database (Denmark)

    Svejvig, Per; Commisso, Trine Hald

    2012-01-01

    that the best practice knowledge has not permeated sufficiently to the practice. Furthermore, the appropriate application of information and communication technology (ICT) remains a big challenge, and finally project managers are not sufficiently trained in organizing and conducting virtual projects....... The overall implications for research and practice are to acknowledge virtual project management as very different to traditional project management and to address this difference.......Virtual projects are common with global competition, market development, and not least the financial crisis forcing organizations to reduce their costs drastically. Organizations therefore have to place high importance on ways to carry out virtual projects and consider appropriate practices...

  7. Project financing

    International Nuclear Information System (INIS)

    Alvarez, M.U.

    1990-01-01

    This paper presents the basic concepts and components of the project financing of large industrial facilities. Diagrams of a simple partnership structure and a simple leveraged lease structure are included. Finally, a Hypothetical Project is described with basic issues identified for discussion purposes. The topics of the paper include non-recourse financing, principal advantages and objectives, disadvantages, project financing participants and agreements, feasibility studies, organization of the project company, principal agreements in a project financing, insurance, and an examination of a hypothetical project

  8. NRC review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document - Evolutionary plant designs, Chapter 1, Project No. 669

    International Nuclear Information System (INIS)

    1992-08-01

    The staff of the US Nuclear Regulatory Commission has prepared Volume 2 (Parts 1 and 2) of a safety evaluation report (SER), ''NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document -- Evolutionary Plant Designs,'' to document the results of its review of the Electric Power Research Institute's ''Advanced Light Water Reactor Utility Requirements Document.'' This SER gives the results of the staff's review of Volume II of the Requirements Document for evolutionary plant designs, which consists of 13 chapters and contains utility design requirements for an evolutionary nuclear power plant (approximately 1300 megawatts-electric)

  9. NRC review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document - Evolutionary plant designs, Chapters 2--13, Project No. 669

    International Nuclear Information System (INIS)

    1992-08-01

    The staff of the US Nuclear Regulatory Commission has prepared Volume 2 (Parts 1 and 2) of a safety evaluation report (SER), ''NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document -- Evolutionary Plant Designs,'' to document the results of its review of the Electric Power Research Institute's ''Advanced Light Water Reactor Utility Requirements Document.'' This SER gives the results of the staff's review of Volume II of the Requirements Document for evolutionary plant designs, which consists of 13 chapters and contains utility design requirements for an evolutionary nuclear power plant (approximately 1300 megawatts-electric)

  10. Evaluation of rubber modified asphalt demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    As part of the Ontario Government's medium-term scrap tire management strategy, 11 rubber modified asphalt demonstration projects were funded or completed, with 13 additional projects from small to large (1,500-65,000 passenger tire equivalents) approved for the 1993 paving season. This report presents the results of an August to November 1993 study of the 11 demonstration projects. The evaluation included a description of the technology; technical review of the projects; economic analysis; review of the environmental literature; environmental review of the projects; comparison of the projects with similar ones in other jurisdictions; and recommendations. Detailed information on asphalt technology is included in an appendix.

  11. A Review of 20 Years of Research on Overdiagnosis and Underdiagnosis in the Rhode Island Methods to Improve Diagnostic Assessment and Services (MIDAS) Project.

    Science.gov (United States)

    Zimmerman, Mark

    2016-02-01

    The Rhode Island Methods to Improve Diagnostic Assessment and Services (MIDAS) project represents an integration of research methodology into a community-based outpatient practice affiliated with an academic medical centre. The MIDAS project is the largest clinical epidemiological study using semi-structured interviews to assess a wide range of psychiatric disorders in a general clinical outpatient practice. In an early report from the MIDAS project, we found that across diagnostic categories clinicians using unstandardized, unstructured clinical interviews underrecognized diagnostic comorbidity, compared with the results of semi-structured interviews. Moreover, we found that the patients often wanted treatment for symptoms of disorders that were diagnosed as comorbid, rather than principal, conditions. This highlighted the importance, from the patient's perspective, of conducting thorough diagnostic interviews to diagnose disorders that are not related to the patient's chief complaint because patients often desire treatment for these additional diagnoses. While several of the initial papers from the MIDAS project identified problems with the detection of comorbid disorders in clinical practice, regarding the diagnosis of bipolar disorder we observed the emergence of an opposite phenomenon-clinician overdiagnosis. The results from the MIDAS project, along with other studies of diagnosis in routine clinical practice, have brought to the forefront the problem with diagnosis in routine clinical practice. An important question is what do these findings suggest about the community standard of care in making psychiatric diagnoses, and whether and how the standard of care should be changed? The implications are discussed. © The Author(s) 2016.

  12. The need for a holistic approach in mangrove-related fisheries research: a specific review of the German and Brazilian research project MADAM.

    Science.gov (United States)

    Saint-Paul, U; Schneider, H

    2016-07-01

    The main objective of the bilateral German-Brazilian mangrove development and management (MADAM) programme (mangrove dynamics and management) was to generate the scientific basis to enable the sustainable stewardship of the resources of the Caeté mangrove estuary in north-east Brazil in the sense of integrated coastal (zone) management. Main emphasis was given to fishes and crabs captured by artisanal fishermen. This paper describes the project strategy as developed and modified in the context of research results obtained over a period of 10 years. It is argued that a continuous discussion process is essential to assess the validity of the strategies formulated at the beginning of a medium-term project, particularly if the project is of an interdisciplinary nature. To achieve this, it was necessary to acquire in-depth knowledge of natural processes as well as of the relevant institutional, cultural, economic, social and political dynamics. © 2016 The Fisheries Society of the British Isles.

  13. Microsoft project

    OpenAIRE

    Markić, Lucija; Mandušić, Dubravka; Grbavac, Vitomir

    2005-01-01

    Microsoft Project je alat čije su prednosti u svakodnevnom radu nezamjenjive. Pomoću Microsoft Projecta omogućeno je upravljanje resursima, stvaranje izvještaja o projektima u vremenu, te analize različitih scenarija. Pojavljuje u tri verzije: Microsoft Project Professional, Microsoft Project Server i Microsoft Project Server Client Access Licenses. Upravo je trend da suvremeni poslovni ljudi zadatke povjeravaju Microsoft Projectu jer on znatno povećava produktivnost rada. Te prednos...

  14. Project ethics

    CERN Document Server

    Jonasson, Haukur Ingi

    2013-01-01

    How relevant is ethics to project management? The book - which aims to demystify the field of ethics for project managers and managers in general - takes both a critical and a practical look at project management in terms of success criteria, and ethical opportunities and risks. The goal is to help the reader to use ethical theory to further identify opportunities and risks within their projects and thereby to advance more directly along the path of mature and sustainable managerial practice.

  15. Mobility, turnover and storage of pollutants in soils, sediments and waters: Achievements and results of the EU project AquaTerra. A review

    NARCIS (Netherlands)

    Barth, J.A.C.; Grathwohl, P.; Fowler, H.J.; Bellin, A.; Gerzabek, M.H.; Lair, G.J.; Barceló, D.; Petrovic, M.; Navarro, A.; Négrel, P.; Petelet-Giraud, E.; Darmendrail, D.; Rijnaarts, H.; Langenhoff, A.; Weert, J. de; Slob, A.; Zaan, B.M. van der; Gerritse, J.; Frank, E.; Gutierrez, A.; Kretzschmar, R.; Gocht, T.; Steidle, D.; Garrido, F.; Jones, K.C.; Meijer, S.; Moeckel, C.; Marsman, A.; Klaver, G.; Vogel, T.; Bürger, C.; Kolditz, O.; Broers, H.P.; Baran, N.; Joziasse, J.; Tümpling, W. von; Gaans, P. van; Merly, C.; Chapman, A.; Brouyère, S.; Batlle Aguilar, J.; Orban, Ph.; Tas, N.; Smidt, H.

    2009-01-01

    AquaTerra is one of the first environmental projects within the 6th Framework program by the European Commission. It began in June 2004 with a multidisciplinary team of 45 partner organizations from 13 EU countries, Switzerland, Serbia, Romania and Montenegro. Results from sampling and modeling in 4

  16. An Action Research Project: Development of a Pre-Licensure Examination Review Course for Emergency Medical Technician Program Graduates at a Rural Community College

    Science.gov (United States)

    Boucher, Daryl

    2013-01-01

    This action research project examined how "Efficiency in Learning" ("EL") strategies, "Appreciative Inquiry" ("AI") and the "Interactive Model of Program Planning" ("IMPP") could be used to discern the content and preferred pedagogical approaches in the development of a pre-licensure…

  17. Russian Language Analysis Project

    Science.gov (United States)

    Serianni, Barbara; Rethwisch, Carolyn

    2011-01-01

    This paper is the result of a language analysis research project focused on the Russian Language. The study included a diverse literature review that included published materials as well as online sources in addition to an interview with a native Russian speaker residing in the United States. Areas of study include the origin and history of the…

  18. Project Temporalities

    DEFF Research Database (Denmark)

    Tryggestad, Kjell; Justesen, Lise; Mouritsen, Jan

    2013-01-01

    Purpose – The purpose of this paper is to explore how animals can become stakeholders in interaction with project management technologies and what happens with project temporalities when new and surprising stakeholders become part of a project and a recognized matter of concern to be taken...... into account. Design/methodology/approach – The paper is based on a qualitative case study of a project in the building industry. The authors use actor-network theory (ANT) to analyze the emergence of animal stakeholders, stakes and temporalities. Findings – The study shows how project temporalities can...... multiply in interaction with project management technologies and how conventional linear conceptions of project time may be contested with the emergence of new non-human stakeholders and temporalities. Research limitations/implications – The study draws on ANT to show how animals can become stakeholders...

  19. 18 CFR 157.37 - Project design.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Project design. 157.37... Seasons for Alaska Natural Gas Transportation Projects § 157.37 Project design. In reviewing any... proposed project has been designed to accommodate the needs of shippers who have made conforming bids...

  20. Optimization of Installation, Operation and Maintenance at Offshore Wind Projects in the U.S.: Review and Modeling of Existing and Emerging Approaches

    Energy Technology Data Exchange (ETDEWEB)

    Baldock, Nick [Garrad Hassan & Partners Ltd, Glasgow (United Kingdom); Sevilla, Fernando [Garrad Hassan & Partners Ltd, Glasgow (United Kingdom); Redfern, Robin [Garrad Hassan & Partners Ltd, Glasgow (United Kingdom); Storey, Alexis [Garrad Hassan & Partners Ltd, Glasgow (United Kingdom); Kempenaar, Anton [Garrad Hassan & Partners Ltd, Glasgow (United Kingdom); Elkinton, Chris [Garrad Hassan America, Inc., San Diego, CA (United States)

    2014-12-19

    The United States Department of Energy (DOE) awarded a grant to GL Garrad Hassan (GL GH) to investigate the logistics, opportunities, and costs associated with existing and emerging installation and operation and maintenance (O&M) activities at offshore wind projects as part of the DOE’s program to reduce barriers facing offshore wind project development in the United States (U.S.). This report (the Report) forms part of Subtopic 5.3 “Optimized Installation, Operation and Maintenance Strategies Study” which in turn is part of the “Removing Market Barriers in U.S. Offshore Wind” set of projects for the DOE. The purpose of Subtopic 5.3 is to aid and facilitate informed decision-making regarding installation and O&M during the development, installation, and operation of offshore wind projects in order to increase efficiency and reduce the levelized cost of energy (LCoE). Given the large area of U.S. territorial waters, the generally higher mean wind speeds offshore, and the proximity to the coast of many large U.S. cities, offshore wind power has the potential to become a significant contributor of energy to U.S. markets. However, for the U.S. to ensure that the development of offshore wind energy projects is carried out in an efficient and cost-effective manner, it is important to be cognizant of the current and emerging practices in both the domestic and international offshore wind energy industries. The U.S. can harness the experience gained globally and combine this with the skills and assets of an already sizeable onshore wind industry, as well as the resources of a mature offshore oil and gas industry, to develop a strong offshore wind sector. The work detailed in this report is aimed at assisting with that learning curve, particularly in terms of offshore specific installation and O&M activities. This Report and the Installation and O&M LCoE Analysis Tool, which were developed together by GL GH as part of this study, allow readers to identify, model

  1. Highway project cost estimating and management.

    Science.gov (United States)

    2009-02-01

    "This report provides detailed information about the project objectives, deliverables, and findings. The project team : thoroughly reviewed the Montana Department of Transportation (MDT) structure, operations, and current procedures as : related to M...

  2. Managing Challenges in a Multi Contractor Project

    Science.gov (United States)

    King, Ron

    2011-01-01

    The presentation provides a project description, describes the integrated product team, and review project challenges. The challenges include programmatic, technical, basic drop tests, heavy drop tests, C-17 envelope expansion, and Ares I-X.

  3. Annual Review of BPA-Funded Projects in Natural and Artificial Propagation of Salmonids, March 27-29, 1985, Holiday Inn Airport, Portland, Oregon.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1985-04-01

    The Fish and Wildlife Division of Bonneville Power Administration (BPA) hosted a meeting for contractors to present the results of fiscal year 1984 research conducted to implement the Northwest Power Planning Council's Fish and Wildlife Program. The meeting focused on those projects specifically related to natural and artificial propagation of salmonids. The presentations were held at the Holiday Inn Airport in Portland, Oregon, on March 27-29, 1985. This document contains abstracts of the presentations from that meeting. Section 1 contains abstracts on artificial propagation, fish health, and downstream migration, and Section 2 contains abstracts on natural propagation and habitat improvement. The abstracts are indexed by BPA Project Number and by Fish and Wildlife Program Measure. The registered attendees at the meeting are listed alphabetically in Appendix A and by affiliation in Appendix B.

  4. Price increase and credit crunch: a double punishment for the financing of energy projects. Review of the Ifri Energy Breakfast Roundtable, 25 November 2008 in Brussels

    International Nuclear Information System (INIS)

    Schulke, Ch.

    2009-01-01

    The roundtable starts by giving an overview of the consequences of the sharp decrease of the oil price and the credit crunch for the financing of energy projects. Some analysts say that under-investment will be the main result and they hence predict a major supply crunch in some year's time. Others are more optimistic and point to the compensation and mitigating effects of the current situation, e.g. demand destruction and substitution. So a major question for the future is the extent of demand destruction that has happened: will this demand come back once the economic crisis is over? Furthermore, as developing costs decrease, will lower cost pressure allow some important projects to go forward? Finally, will the low oil revenue have an influence on producer countries stance on foreign investment by International Oil Companies? A discussion with the audience follows the presentations

  5. Vehicle compatibility in car-to-car collisions : literature review in the framework of the European research project "Improvement of crash compatibility between cars", Workpackage 1.

    NARCIS (Netherlands)

    Sluis, J. van der

    2000-01-01

    In this report, a literature review is given on the subject of crash compatibility and incompatibility between cars. The study is based on scientific publications on this subject published over the last 15 years. The compatibility problem is described from three points of view: statistical,

  6. Final Independent External Peer Review Report for the Intake Diversion Dam Modification Lower Yellowstone Project, Montana Draft Supplement to the 26 April 2010 Environmental Assessment and Appendices

    Science.gov (United States)

    2013-02-08

    FONSI Finding of No Significant Impact G.E. General Engineer HEC -HMS Hydrologic Engineering Center–Hydrologic Modeling System HEC - RAS Hydrologic...with HEC - RAS 4.0 (Hydrologic Engineering Center-River Analysis System) and similar USACE hydrologic and hydraulic computer models x...including Hydrologic Engineering Center-River Analysis System ( HEC - RAS ) 4.0, and has project experience using HEC -1, HEC -2, and HEC -Hydrologic Modeling

  7. NRC review of Electric Power Research Institute's advanced light water reactor utility requirements document. Passive plant designs, chapter 1, project number 669

    International Nuclear Information System (INIS)

    1994-08-01

    The Electric Power Research Institute (EPRI) is preparing a compendium of technical requirements, referred to as the open-quotes Advanced Light Water Reactor [ALWR] Utility Requirements Documentclose quotes, that is acceptable to the design of an ALWR power plant. When completed, this document is intended to be a comprehensive statement of utility requirements for the design, construction, and performance of an ALWR power plant for the 1990s and beyond. The Requirements Document consists of three volumes. Volume 1, open-quotes ALWR Policy and Summary of Top-Tier Requirementsclose quotes, is a management-level synopsis of the Requirements Document, including the design objectives and philosophy, the overall physical configuration and features of a future nuclear plant design, and the steps necessary to take the proposed ALWR design criteria beyond the conceptual design state to a completed, functioning power plant. Volume II consists of 13 chapters and contains utility design requirements for an evolutionary nuclear power plant [approximately 1350 megawatts-electric (MWe)]. Volume III contains utility design requirements for nuclear plants for which passive features will be used in their designs (approximately 600 MWe). In April 1992, the staff of the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, issued Volume 1 and Volume 2 (Parts 1 and 2) of its safety evaluation report (SER) to document the results of its review of Volumes 1 and 2 of the Requirements Document. Volume 1, open-quotes NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document - Program Summaryclose quotes, provided a discussion of the overall purpose and scope of the Requirements Document, the background of the staff's review, the review approach used by the staff, and a summary of the policy and technical issues raised by the staff during its review

  8. NRC review of Electric Power Research Institute's advanced light water reactor utility requirements document. Passive plant designs, chapters 2-13, project number 669

    International Nuclear Information System (INIS)

    1994-08-01

    The Electric Power Research Institute (EPRI) is preparing a compendium of technical requirements, referred to as the open-quotes Advanced Light Water Reactor [ALWR] Utility Requirements Documentclose quotes, that is acceptable to the design of an ALWR power plant. When completed, this document is intended to be a comprehensive statement of utility requirements for the design, construction, and performance of an ALWR power plant for the 1990s and beyond. The Requirements Document consists of three volumes. Volume I, open-quotes ALWR Policy and Summary of Top-Tier Requirementsclose quotes, is a management-level synopsis of the Requirements Document, including the design objectives and philosophy, the overall physical configuration and features of a future nuclear plant design, and the steps necessary to take the proposed ALWR design criteria beyond the conceptual design state to a completed, functioning power plant. Volume II consists of 13 chapters and contains utility design requirements for an evolutionary nuclear power plant [approximately 1350 megawatts-electric (MWe)]. Volume III contains utility design requirements for nuclear plants for which passive features will be used in their designs (approximately 600 MWe). In April 1992, the staff of the Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, issued Volume 1 and Volume 2 (Parts 1 and 2) of its safety evaluation report (SER) to document the results of its review of Volumes 1 and 2 of the Requirements Document. Volume 1, open-quotes NRC Review of Electric Power Research Institute's Advanced Light Water Reactor Utility Requirements Document - Program Summaryclose quotes, provided a discussion of the overall purpose and scope of the Requirements Document, the background of the staff's review, the review approach used by the staff, and a summary of the policy and technical issues raised by the staff during its review

  9. Oluvil Port Development Project

    DEFF Research Database (Denmark)

    Frigaard, Peter; Margheritini, Lucia

    Oluvil Port Development Project is the first development of a large port infrastructure in the entire eastern coastline of Sri Lanka. The project is supported by the Danish Foreign Ministry. Feasibility studies and detailed design studies were carried out by Lanka Hydraulic Institute Ltd during...... the years 1995 to 2003. The design was reviewed by COWI a/s. Construction of the port was started in 2008. MT Højgaard a/s acted as contractor. The outer breakwaters were constructed as first part of the project. During and after completion of the breakwaters a serious beach erosion and sand accumulation...... has been observed. Severe erosion is seen north of the harbour and some accumulation of sand is seen south of the harbour. On a sandy coastline like the one in Oluvil such erosion problems as observed are very typical. The report: Oluvil Port Development Project: Studies on Beach Erosion written...

  10. Clean air and project financing

    International Nuclear Information System (INIS)

    Zimmer, M.J.

    1992-01-01

    This article examines how environmental requirements are challenging the developers ability to secure financing for independent energy projects. The topics addressed in the article include a review of the US Environmental Protection Agency auction rules for acid rain emission allowances, short term and long term market demand, project financing issues, credit value and matching interests

  11. Competitiveness Improvement Project Informational Workshop

    Energy Technology Data Exchange (ETDEWEB)

    Sinclair, Karin C [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Preus, Robert W [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Dana, Scott [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Van Dam, Jeroen J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Damiani, Rick R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jackson, Kyndall R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Baring-Gould, Edward I [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Jain, Anant [Intertek

    2018-02-27

    This presentation was given at the Competitiveness Improvement Project (CIP) Informational Workshop on December 6, 2017. Topics covered during the workshop include an overview of the CIP, past projects, scoring criteria, technical support opportunities, certification body requirements, standards applicable to distributed wind generators, information on the National Electric Code, certification testing requirements, test site requirements, National Environmental Policy Act, design review, levelized cost of energy, procurement/contracting, project management/deliverables, and outreach materials.

  12. The Impact of BIM-based virtual and augmented reality interfaces on health and safety in construction projects: protocol for a systematic review

    OpenAIRE

    Alfredo Soeiro; Adeeb Sidani; João Santos Baptista; João Pedro Poças Martins; Fabio Dinis; J. Duarte

    2018-01-01

    The construction sector is notable for its interdisciplinary knowledge and complex interactions between different parties and the sector has been gradually adopting new methodologies to improve work and collaboration practices, such as the case of Building Information Modeling (BIM). A protocol for a systematic review is proposed to evaluate the effectiveness of virtual reality techniques in the Architectural, Engineering, Construction and Operations sector. The search will be carried out in ...

  13. Research Review

    Science.gov (United States)

    Serig, Dan

    2011-01-01

    In this review, the author explores an often-used process in research--the mind map. He uses this method in his own research and artwork. He also uses this extensively with students, particularly master students when they are trying to surround issues in their thesis projects. Mind maps are closely associated with brainstorming, as brainstorming…

  14. BPA review of Washington Public Power Supply System, Projects 1 and 3 (WNP 1 and 3), construction schedule and financing assumptions

    International Nuclear Information System (INIS)

    1984-01-01

    This document contains the following appendices: Data provided By Supply System Regarding Costs and Schedules; Basic Supply System Data and Assumptions; Detailed Modeling of Net Present Values; Origin and Detailed Description of the System Analysis Mode; Decision Analysis Model; Pro Forma Budget Expenditure Levels for Fiscal years 1984 through 1990; Financial Flexibility Analysis - Discretionary/Nondiscretionary Expenditure Levels; Detailed Analysis of BPA's Debt Structure Under the 13 Pro Forma Budget Scenarios for Fiscal Years 1984 through 1990; Wertheim and Co., Inc., August 30, 1984 Letter; Project Considerations and Licensing/Regulatory Issues, Supply System September 15, 1984 Letter; and Summary of Litigation Affecting WNP 1 and 3, and WNP 4 and 5

  15. Disposal of high active nuclear fuel waste. A critical review of the Nuclear Fuel Safety (KBS) project on final disposal of vitrified high active nuclear fuel waste

    International Nuclear Information System (INIS)

    1978-01-01

    This report has been prepared by the Swedish Energy Commission's working group for Safety and Environment. The main contributions are by profs. Jan Rydberg of Chalmers University of Technology, Sweden and John W Winchester of Florida State University, USA. The aim of the report is to discuss weather the KBS-project fullfills the Swedish ''Stipulations Act'', that a absolutely safe way of disposing of the nuclear waste must have been demonstrated before any new reactors are allowed to be taken inot use. Rydberg and Winchester do not arrive at similar conclusions. (L.E.)

  16. LEX Project

    DEFF Research Database (Denmark)

    Damkilde, Lars; Larsen, Torben J.; Walbjørn, Jacob

    This document is aimed at helping all parties involved in the LEX project to get a common understanding of words, process, levels and the overall concept.......This document is aimed at helping all parties involved in the LEX project to get a common understanding of words, process, levels and the overall concept....

  17. OMEGA project

    International Nuclear Information System (INIS)

    Shibuya, E.H.

    1989-01-01

    The OMEGA - Observation of Multiple particle production, Exotic Interactions and Gamma-ray Air Shower-project is presented. The project try to associate photosensitive detectors from experiences of hadronic interactions with electronic detectors used by experiences that investigate extensive atmospheric showers. (M.C.K.)

  18. Decontamination systems information and research program -- Literature review in support of development of standard test protocols and barrier design models for in situ formed barriers project

    International Nuclear Information System (INIS)

    1994-12-01

    The US Department of Energy is responsible for approximately 3,000 sites in which contaminants such as carbon tetrachloride, trichlorethylene, perchlorethylene, non-volatile and soluble organic and insoluble organics (PCBs and pesticides) are encountered. In specific areas of these sites radioactive contaminants are stored in underground storage tanks which were originally designed and constructed with a 30-year projected life. Many of these tanks are now 10 years beyond the design life and failures have occurred allowing the basic liquids (ph of 8 to 9) to leak into the unconsolidated soils below. Nearly one half of the storage tanks located at the Hanford Washington Reservation are suspected of leaking and contaminating the soils beneath them. The Hanford site is located in a semi-arid climate region with rainfall of less than 6 inches annually, and studies have indicated that very little of this water finds its way to the groundwater to move the water down gradient toward the Columbia River. This provides the government with time to develop a barrier system to prevent further contamination of the groundwater, and to develop and test remediation systems to stabilize or remove the contaminant materials. In parallel to remediation efforts, confinement and containment technologies are needed to retard or prevent the advancement of contamination plumes through the environment until the implementation of remediation technology efforts are completed. This project examines the various confinement and containment technologies and protocols for testing the materials in relation to their function in-situ

  19. Human Genome Project

    Energy Technology Data Exchange (ETDEWEB)

    Block, S. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Cornwall, J. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Dally, W. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Dyson, F. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Fortson, N. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Joyce, G. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Kimble, H. J. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Lewis, N. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Max, C. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Prince, T. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Schwitters, R. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Weinberger, P. [The MITRE Corporation, McLean, VA (US). JASON Program Office; Woodin, W. H. [The MITRE Corporation, McLean, VA (US). JASON Program Office

    1998-01-04

    The study reviews Department of Energy supported aspects of the United States Human Genome Project, the joint National Institutes of Health/Department of Energy program to characterize all human genetic material, to discover the set of human genes, and to render them accessible for further biological study. The study concentrates on issues of technology, quality assurance/control, and informatics relevant to current effort on the genome project and needs beyond it. Recommendations are presented on areas of the genome program that are of particular interest to and supported by the Department of Energy.

  20. Book reviews

    Directory of Open Access Journals (Sweden)

    Redactie KITLV

    2011-12-01

    Rich Puerto Rican Citizen: History and Political Identity in Twentieth-Century New York City, by Lorrin Thomas (reviewed by Jorge Duany Livestock, Sugar and Slavery: Contested Terrain in Colonial Jamaica, by Verene A. Shepherd (reviewed by Justin Roberts Daddy Sharpe: A Narrative of the Life and Adventures of Samuel Sharpe, a West Indian Slave Written by Himself, 1832, by Fred W. Kennedy (reviewed by Gad Heuman Becoming Rasta: Origins of Rastafari Identity in Jamaica, by Charles Price (reviewed by Jahlani A. Niaah Reggaeton, edited by Raquel Z. Rivera, Wayne Marshall & Deborah Pacini Hernandez (reviewed by Alexandrine Boudreault-Fournier Carriacou String Band Serenade: Performing Identity in the Eastern Caribbean, by Rebecca S. Miller (reviewed by Nanette de Jong Caribbean Visionary: A.R.F. Webber and the Making of the Guyanese Nation, by Selwyn R. Cudjoe (reviewed by Clem Seecharan Guyana Diaries: Women’s Lives Across Difference, by Kimberely D. Nettles (reviewed by D. Alissa Trotz Writers of the Caribbean Diaspora: Shifting Homelands, Travelling Identities, edited by Jasbir Jain & Supriya Agarwal (reviewed by Joy Mahabir Queen of the Virgins: Pageantry and Black Womanhood in the Caribbean, by M. Cynthia Oliver (reviewed by Tami Navarro Notions of Identity, Diaspora, and Gender in Caribbean Women’s Writing, by Brinda Mehta (reviewed by Marie-Hélène Laforest Authority and Authorship in V.S. Naipaul, by Imraan Coovadia (reviewed by A shley Tellis Typo/Topo/Poéthique sur Frankétienne, by Jean Jonassaint (reviewed by Martin Munro Creoles in Education: An Appraisal of Current Programs and Projects, edited by Bettina Migge, Isabelle Léglise & Angela Bartens (reviewed by Jeff Siegel Material Culture in Anglo-America: Regional Identity and Urbanity in the Tidewater, Lowcountry, and Caribbean, edited by David S. Shields (reviewed by Susan Kern Tibes: People, Power, and Ritual at the Center of the Cosmos