WorldWideScience

Sample records for project review meetings

  1. First interim project review meeting on management of water hyacinth

    International Nuclear Information System (INIS)

    1980-01-01

    The first project planning meeting was held in New Delhi during 1978 and the second, a project review meeting, in Papua New Guinea during June 1979, both funded by UNEP. Reports from the regional coordinators for Bangladesh, Malaysia, Sri Lanka, Fiji and India are presented. Also presented are reports from the national coordinators for Malaysia, Bangladesh and India. Two visits (a visit to India, Bangladesh and Sri Lanka to study the feasibility of making a film on the work done with water hyacinth and a visit to the U.S. by the regional project coordinator) are also described

  2. 1990 DOE/SANDIA crystalline photovoltaic technology project review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Ruby, D.S. (ed.)

    1990-07-01

    This document serves as the proceedings for the annual project review meeting held by Sandia's Photovoltaic Cell Research Division and Photovoltaic Technology Division. It contains information supplied by each organization making a presentation at the meeting, which was held August 7 through 9, 1990 at the Sheraton Hotel in Albuquerque, New Mexico. Sessions were held to discuss national photovoltaic programs, one-sun crystalline silicon cell research, concentrator silicon cell research, concentrator 3-5 cell research, and concentrating collector development.

  3. The 1991 DOE/Sandia Crystalline Photovoltaic Technology Project Review Meeting

    Science.gov (United States)

    Whipple, M. L.

    1991-07-01

    This document serves as the proceedings for the manual project review meeting held by Sandia's Photovoltaic Technology Research Division. It contains information supplied by each organization making a presentation at the meeting, which was held July 30 through 31, 1991 at the Sheraton Hotel in Albuquerque, New Mexico. Sessions were held to discuss national photovoltaic programs, one-sun crystalline silicon cell research, concentrator silicon cell research, and concentrating collector development.

  4. Athens automation and control experiment project review meeting, Dallas, Texas, December 5-6, 1984

    Energy Technology Data Exchange (ETDEWEB)

    Detwiler, J.S.; Hu, P.S.; Lawler, J.S.; Markel, L.C.; McIntyre, J.M.; McKinley, K.F.; Monteen, L.D.; Purucker, S.L.; Reed, J.H.; Rizy, D.T.

    1985-12-01

    The AACE is an electric power distribution automation project involving research and development of both hardware and software. Equipment for the project is being installed on the electric distribution system of the Athens Utilities Board (AUB), located in Athens, Tennessee. Purposes of the AACE are to develop and test load control, volt/var control, and system reconfiguration capabilities on an electric distribution system and to transfer what is learned to the electric utility industry. Expected benefits include deferral of costly power generation plants and increased electric service reliability. A project review meeting was held to review the progress of the AACE and to communicate the objectives and experimental plans to the electric utility industry. At the time of the meeting, the experimental test plans were being written; much of the AACE field equipment had been received by AUB, and installation had begun. A computer system, the AACE Test System (AACETS), was already operational at ORNL. AACETS will be used to develop and test applications software and experimental control strategies prior to their implementation on the AUB system. The AACE experiments are scheduled to begin in October 1985 and to continue through October 1987.

  5. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    International Nuclear Information System (INIS)

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations

  6. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations.

  7. Athens automation and control experiment project review meeting, Knoxville, Tennessee, December 3-5, 1985

    Energy Technology Data Exchange (ETDEWEB)

    Braithwait, S.D.; Broadaway, E.R.; Fortson, N.D.; Gellings, C.W.; Hu, P.S.; Lawler, J.S.; Markel, L.C.; McKinley, K.F.; Monteen, L.D.; Newton, B.K.

    1986-08-01

    The AACE is an electric power distribution automation project involving research and development of both hardware and software. Equipment for the project is being installed on the electric distribution system in Athens, Tennessee. Purposes of the AACE are to develop and test load control, volt/var control, and system reconfiguration capabilities on an electric distribution system and to transfer what is learned to the electric utility industry. Expected benefits include deferral of costly power generation plants and increased electric service reliability.

  8. Annual DOE active solar heating and cooling contractors' review meeting. Premeeting proceedings and project summaries

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1981-09-01

    Ninety-three project summaries are presented which discuss the following aspects of active solar heating and cooling: Rankine solar cooling systems; absorption solar cooling systems; desiccant solar cooling systems; solar heat pump systems; solar hot water systems; special projects (such as the National Solar Data Network, hybrid solar thermal/photovoltaic applications, and heat transfer and water migration in soils); administrative/management support; and solar collector, storage, controls, analysis, and materials technology. (LEW)

  9. ASEAN projects reviewed.

    Science.gov (United States)

    1980-01-01

    The ASEAN Population Expert Group met in Manila and was followed by a meeting of the ASEAN heads of population programs, during the period November 5-10, 1979. Heads of population programs from Indonesia, Malaysia, Singapore, Thailand, and the Philippines attended. The meetings were held to review progress-to-date on phase 1 projects and to consider the development of an expanded population program. 5 projects funded by UNFPA are reviewed in tabular form with the project, the sponsoring country, date of implementation, data analysis, and date of completion. Suggestions were made for improving and extending these projects and it was also suggested that all projects being developed and proposed should include a section on use of research. 7 new projects were proposed as phase 2 projects. The 1st, sponsored by Malaysia, deals with women in development; project 2, lead by Thailand, will investigate population movement and its effect on development; project 3, led by the Philippines, will develop and strengthen national population information systems and networks in ASEAN countries; project 4, led by Indonesia, is directed towards institutional development and exchanges of personnel; project 5, led by the Philippines, will examine population and development dynamics and the man/resources balance; project 6, led by Thailand, will develop ASEAN social indicators; and project 7, led by Indonesia and Malaysia, will make a comprehensive analysis of existing medical/health care and family planning systems. It was recommended that an executive director of the proposed ASEAN population coordination unit should be appointed to expedite the recommendations of the meeting related to preparation and submission of phase 2 project proposals.

  10. Review of Meeting Objectives

    International Nuclear Information System (INIS)

    Braams, B.J.; Chung, H.-K.

    2011-01-01

    This is the 21st meeting of the International Atomic and Molecular Data Centres Network. The traditional DCN meeting objectives are: to exchange information about activities in the Centres and review progress; to coordinate work in the Centres; to assess priorities in data evaluation and data production; to make plans for specific evaluations; and to evaluate and revise procedures for collection and exchange of bibliographical and numerical data. All of these are objectives for the present meeting too. In addition to the presentations from DCN and prospective DCN members we have two participants from outside the field of fusion data: Dr N. Mason will tell us about coordination of the Virtual Atomic and Molecular Data Centre and Dr S. Simakov will describe the manner in which nuclear structure and cross-section database development is coordinated by our colleagues in the Nuclear Data Section. In the discussions on Thursday and Friday there are two topics that need special attention this year: the future of our bibliographical data compilation and ways in which we can strengthen data evaluation activities, all with emphasis on collision processes and plasma-material interaction. The first 3 Data Centre Network meetings were held in 1977, 1980 and 1982 and the reports of those meetings make interesting reading and can still provide inspiration for the present meeting. I show some excerpts in the presentation. In 1977 the emphasis was on the coordination of the bibliographical database, AMBDAS, and a collision data index, CIAMDA, as the initial activities of the Network and of the newly formed IAEA A+M Data Unit. In 1980 the central topic of discussion at the meeting shifted to the numerical database and to data evaluation. The Network recommended that numerical data be reviewed by a selected group of scientists and that no unevaluated numerical A+M collision data should be distributed by the IAEA. The report of the meeting in 1982 shows that the bibliographical

  11. Medical imaging projects meet at CERN

    CERN Multimedia

    CERN Bulletin

    2013-01-01

    ENTERVISION, the Research Training Network in 3D Digital Imaging for Cancer Radiation Therapy, successfully passed its mid-term review held at CERN on 11 January. This multidisciplinary project aims at qualifying experts in medical imaging techniques for improved hadron therapy.   ENTERVISION provides training in physics, medicine, electronics, informatics, radiobiology and engineering, as well as a wide range of soft skills, to 16 researchers of different backgrounds and nationalities. The network is funded by the European Commission within the Marie Curie Initial Training Network, and relies on the EU-funded research project ENVISION to provide a training platform for the Marie Curie researchers. The two projects hold their annual meetings jointly, allowing the young researchers to meet senior scientists and to have a full picture of the latest developments in the field beyond their individual research project. ENVISION and ENTERVISION are both co-ordinated by CERN, and the Laboratory hosts t...

  12. The ITER divertor cassette project meeting

    International Nuclear Information System (INIS)

    Merola, M.; Riccardi, B.; Tivey, R.

    1999-01-01

    The Divertor Cassette Project topical meeting was held on May 26-28, 1999 at the ENEA Brasimone Research Centre in Camugnano (Bologna), Italy. Specialists from all the four Parties and the JCT participated in the meeting. It was concluded that the Divertor Cassette Project has significantly contributed to solving a large part of the critical issues of the ITER divertor design

  13. Review/decide and inquiry/decide. Two approaches to decision making. Report from a team syntegrity meeting. Project RISCOM

    International Nuclear Information System (INIS)

    Andersson, Kjell

    1998-01-01

    The meeting addressed the question how it is possible to make decision processes and risk assessment for deep repository development more transparent. The two dominant decision approaches used in Sweden and the UK, review/decide(r/d) and inquiry/decide(i/d), were discussed. The main conclusions from group discussions were: It was acknowledged that the concept of transparency includes three equally important aspects: factual issues, value issues, and stake holder's authenticity. There is a need in both countries to bring in the best aspects of both the r/d and the i/d approaches. Both approaches seem to offer possibilities and suffer limitations with respect to the segregation of facts, uncertainties and value judgements, and some sort of combination of the two may present a valuable development. However, neither the i/d nor the r/d approach seems to provide a good framework for clarification of the value issue. Experts have dominated the decision process in both countries. There is a need for a more genuine consultation process. The Swedish EIA is evolving in this direction. The regulator should take part in the process, also at an early stage. It is important that the integrity of the regulator is maintained. Rules and responsibilities of implementers, regulators, planning authorities and other decision-makers should be established early in the process. The public should know that they have access to a process that clarifies value judgements, facts, uncertainties and questions. It is necessary for the public to know what the technical issues are, and to have the means to evaluate the authenticity of the experts. It is important that political decisions are not taken without due consideration of scientific and technical arguments. There are factors beside safety assessments which are completely legitimate to consider. An approach with intense interaction between politicians, experts and the public is needed

  14. Review/decide and inquiry/decide. Two approaches to decision making. Report from a team syntegrity meeting. Project RISCOM

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Kjell [ed.] [Karinta-Konsult, Taeby (Sweden)

    1998-01-01

    The meeting addressed the question how it is possible to make decision processes and risk assessment for deep repository development more transparent. The two dominant decision approaches used in Sweden and the UK, review/decide(r/d) and inquiry/decide(i/d), were discussed. The main conclusions from group discussions were: It was acknowledged that the concept of transparency includes three equally important aspects: factual issues, value issues, and stake holder`s authenticity. There is a need in both countries to bring in the best aspects of both the r/d and the i/d approaches. Both approaches seem to offer possibilities and suffer limitations with respect to the segregation of facts, uncertainties and value judgements, and some sort of combination of the two may present a valuable development. However, neither the i/d nor the r/d approach seems to provide a good framework for clarification of the value issue. Experts have dominated the decision process in both countries. There is a need for a more genuine consultation process. The Swedish EIA is evolving in this direction. The regulator should take part in the process, also at an early stage. It is important that the integrity of the regulator is maintained. Rules and responsibilities of implementers, regulators, planning authorities and other decision-makers should be established early in the process. The public should know that they have access to a process that clarifies value judgements, facts, uncertainties and questions. It is necessary for the public to know what the technical issues are, and to have the means to evaluate the authenticity of the experts. It is important that political decisions are not taken without due consideration of scientific and technical arguments. There are factors beside safety assessments which are completely legitimate to consider. An approach with intense interaction between politicians, experts and the public is needed.

  15. 76 FR 23992 - Meeting To Review and Solicit Input on Tests for Inclusion in the Project 25 Compliance...

    Science.gov (United States)

    2011-04-29

    .../after time-out? Are repeater inbound and outbound packets ``paired'' and timing relationship between the... logistics information for the call. To be considered at the meeting, written comments and input on the...

  16. Meeting of the ITER CTA Project Board

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2001-01-01

    The meeting of the ITER CTA Project Board took place in Toronto, Canada on 7 November 2001, on the occasion of the first Negotiations Meeting. Twelve participants, representing PB members and experts from Canada, the EU, Japan, the RF and the international Team (IT), attended the meeting chaired by Acad. E. Velikhov. Discussions on the preliminary work programme for the CTA and organizational arrangements for the IT and PT took most of the time of the meeting. The Project Board approved the preliminary work programme as presented by the IT leader

  17. Meeting of the ITER CTA Project Board

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2002-01-01

    The meeting of the ITER co-ordinated technical activities project board took place in Tokyo, Japan, on 21 January 2002, coinciding with the second Negotiators meeting (N2). Twelve participants, project board members and experts from Canada, European Union, the Russian Federation and the international team attended the meeting. The project board agreed to provide an R and D plan by June 2002, to be linked with the procurement allocation, for the period following the CTA. The ITER International Team Leader developed a proposal on establishing the working groups for drafting technical specifications for the most urgent procurement items

  18. Meeting of the ITER CTA Project Board

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2002-01-01

    The meeting of the ITER CTA Project Board (PB) took place in Toronto, Canada on 16 September 2002 on the occasion of the fifth Negotiations Meeting (N-5). Thirteen participants, PB members and experts from Canada, EU, Japan, RF and the International Team (IT) attended the meeting chaired by Acad. E. Velikhov. PB heard progress reports of the participating parties and the comments concerning the status of participants team (PT) and the IT were presented

  19. The ITER Divertor Cassette Project meeting

    International Nuclear Information System (INIS)

    Akiba, M.; Tivey, R.

    2000-01-01

    The Divertor Cassette Project topical meeting took place on April 5-7, 2000 at the JAERI Naka site in Japan. The meeting focused on the progress made by the three parties under task agreements on the development of carbon-fibre composite and tungsten armored high flux plasma-facing components

  20. Meeting of the ITER CTA project board

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2002-01-01

    This is information about meeting of the ITER CTA project board, which took place in Moscow, Russian Federation on 22 April 2002 on the occasion of the Third Negotiators Meeting (N3). Thirteen participants, representing PB members and experts from Canada (CA), the European Union (EU), Japan(JA), the Russian federation (RF) and the International Team (IT) attended the meeting chaired by Acad. E. Velikhov. The Project Board took note of the comments made concerning the status of the Participants Teams(PTs)

  1. Final ITER CTA project board meeting

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2003-01-01

    The final ITER CTA Project Board Meeting (PB) took place in Barcelona, Spain on 8 December 2002. The PB took notes of the comments concerning the status of the International Team and the Participants Teams, including Dr. Aymar's report 'From ITER to a FUSION Power Reactor' and the assessment of the ITER project cost estimate

  2. University Research Consortium annual review meeting program

    International Nuclear Information System (INIS)

    1996-07-01

    This brochure presents the program for the first annual review meeting of the University Research Consortium (URC) of the Idaho National Engineering Laboratory (INEL). INEL is a multiprogram laboratory with a distinctive role in applied engineering. It also conducts basic science research and development, and complex facility operations. The URC program consists of a portfolio of research projects funded by INEL and conducted at universities in the United States. In this program, summaries and participant lists for each project are presented as received from the principal investigators

  3. University Research Consortium annual review meeting program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    This brochure presents the program for the first annual review meeting of the University Research Consortium (URC) of the Idaho National Engineering Laboratory (INEL). INEL is a multiprogram laboratory with a distinctive role in applied engineering. It also conducts basic science research and development, and complex facility operations. The URC program consists of a portfolio of research projects funded by INEL and conducted at universities in the United States. In this program, summaries and participant lists for each project are presented as received from the principal investigators.

  4. Meeting of the ITER CTA Project Board

    International Nuclear Information System (INIS)

    2001-01-01

    Full text: A preparatory meeting of the Co-ordinated Technical Activities (CTA) Project Board took place in Vienna on 16 July 2001. The Board Members of Canada, EU, Japan, RF and of the CTA International Team participated in the Meeting, which was chaired by Acad. E. Velikhov. The major item on the Meeting Agenda was the discussion of the scope of the CTA. In this discussion the following comments were expressed: One of the prime objectives during the CTA is to develop technical specifications for procurement of critical items (magnets, vacuum vessel, and buildings). It was noted that the discussions with potential suppliers should confirm manufacturing processes in details in order to explore possible schedule reduction strategies. Safety analysis and licensing preparation should proceed on all proposed sites up to the preferred site designation, to ensure the overall implementation schedule is minimized and to resolve major technical issues needed for licensing. Several R and D issues remain to be further developed during the CTA. Special attention should be given by the Participants to two areas: Diagnostics; Heating and Current Drive Systems. Arrangements for continuation of the ITER Physics Expert Groups activities should be provided. To this end a new framework, called International Tokamak Physics Activity, is being planned. The Board encouraged the Participants' Representatives in the Co-ordinating committee of this activity to support the preparation for urgent Topical Group Meetings. The Board agreed that the Design Authority will be invested in the International Team and that proposals for site specific design changes should be agreed upon by the International Team Leader before being studied in detail. The Meeting agreed on some arrangements which will remain from the EDA, namely the ITER EDA Council Office in Moscow as Office of the PB Chair, and the ITER Office located at the IAEA in Vienna as agreed by the IAEA. The Board recommended that effective

  5. Development and field evaluation of animal feed supplementation packages. Proceedings of the final review meeting of an IAEA Technical Co-operation Regional AFRA Project

    International Nuclear Information System (INIS)

    2002-06-01

    evaluate reproductive performance in animals that are subjected to different feed supplementation strategies. It was, however, realised that this technique has potential to monitor and improve existing support services to livestock farmers such as artificial insemination and to introduce new services such as early diagnosis of non-pregnancy and infertility. In order to ensure future sustainability of the RIA for use in such applications, the work on the second component has now been taken under a new project (RAF/5/046). This publication contains the results presented by the scientists of National Agricultural Research Systems of African countries who participated in the Final Review meeting held in Cairo, Egypt from 25 to 29 November 2000, which dealt with only the nutrition component, Development and Field Evaluation of Feed Supplementation Strategies. This publication also contains some selected papers presented at the National Training Workshop on Field Evaluation and Development of the Dry Season Feed Supplementation Packages for Ruminant Animals in the Traditional Smallholder Farms organized with financial assistance from the IAEA, from 25 to 29 July 1999, in Lusaka, Zambia

  6. Draft Executive Summary Hawaii Geothermal Project - EIS Scoping Meetings

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-03-01

    After introductions by the facilitator and the program director from DOE, process questions were entertained. It was also sometimes necessary to make clarifications as to process throughout the meetings. Topics covered federal involvement in the HGP-EIS; NEPA compliance; public awareness, review, and access to information; Native Hawaiian concerns; the record of decision, responsibility with respect to international issues; the impacts of prior and on-going geothermal development activities; project definition; alternatives to the proposed action; necessary studies; Section 7 consultations; socioeconomic impacts; and risk analysis. Presentations followed, in ten meetings, 163 people presented issues and concerns, 1 additional person raised process questions only.

  7. Proceedings of the fuels technology contractors review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Malone, R.D. [ed.

    1993-11-01

    The Fuels Technology Contractors Review Meeting was held November 16-18, 1993, at the Morgantown Energy Technology Center (METC) in Morgantown, West Virginia. This meeting was sponsored and hosted by METC, the Office of Fossil Energy, U.S. Department of Energy (DOE). METC periodically provides an opportunity to bring together all of the R&D participants in a DOE-sponsored contractors review meeting to present key results of their research and to provide technology transfer to the active research community and to the interested public. This meeting was previously called the Natural Gas Technology Contractors Review Meeting. This year it was expanded to include DOE-sponsored research on oil shale and tar sands and so was retitled the Fuels Technology Contractors Review Meeting. Current research activities include efforts in both natural gas and liquid fuels. The natural gas portion of the meeting included discussions of results summarizing work being conducted in fracture systems, both natural and induced; drilling, completion, and stimulation research; resource characterization; delivery and storage; gas to liquids research; and environmental issues. The meeting also included project and technology summaries on research in oil shale, tar sands, and mild coal gasification, and summaries of work in natural-gas fuel cells and natural-gas turbines. The format included oral and poster session presentations. Individual papers have been processed separately for inclusion in the Energy Science and Technology database.

  8. 2017 Project Peer Review Report

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2018-02-06

    This document summarizes the recommendations and evaluations provided by an independent external panel of experts at the 2017 U.S. Department of Energy Bioenergy Technologies Office's Peer Review meeting.

  9. Review of BPA funded sturgeon, resident fish and wildlife projects

    International Nuclear Information System (INIS)

    1990-12-01

    The Bonneville Power Administration (BPA) held a public meeting on November 19--21, 1991, for the purpose of review, coordination, and consultation of the BPA-funded projects for sturgeon, resident fish, and wildlife in the Columbia River Basin (Basin). The comments received after the meeting were favorable and the participants agreed that the meeting was stimulating and productive. The information exchanged should lead to better coordination with other projects throughout the Basin. This document list the projects by title, the project leaders and BPA's project officers, and an abstract of each leader's presentation

  10. Poverty alleviation project review

    CSIR Research Space (South Africa)

    Braun, AL

    2003-01-01

    Full Text Available seven pure cashmere rams from project. EC (Emerging farmers) farmers have also received 43 upgraded cashmere rams from Dept. of Agric. EC From the plus minus 1800 goats involved in the project at least 450 kids / offspring of the improved goats have been...

  11. 75 FR 42742 - Alaska Village Electric Cooperative; Notice of Environmental Site Review and Scoping Meeting

    Science.gov (United States)

    2010-07-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13272-001] Alaska Village Electric Cooperative; Notice of Environmental Site Review and Scoping Meeting July 15, 2010. a. Project No.: 13272-001. b. Name of Project: Old Harbor Hydroelectric Project. c. Location: On Mountain Creek, near the town of Old Harbor, Kodiak Island...

  12. New Source Review (NSR) Air Permitting and Energy Efficiency for Industrial Projects, IECA Manufacturers for Energy Efficiency Coalition Meeting (Presentation) – April 18, 2012

    Science.gov (United States)

    This presentation provides information about major new source review (NSR), including recent improvement changes and court rulings, flexible air permits rule, significant deterioration rules, and energy efficiency considerations.

  13. 77 FR 5750 - Major Capital Investment Projects (NPRM); Public Meetings

    Science.gov (United States)

    2012-02-06

    ...-0009] RIN 2132-AB02 Major Capital Investment Projects (NPRM); Public Meetings AGENCY: Federal Transit... Capital Investments program (``New Starts'' and ``Small Starts''). During these sessions, FTA staff will... amend the regulations for Major Capital Investment Projects at 49 CFR 611. The docket for comments on...

  14. Photovoltaic concentrator technology development project. Sixth project integration meeting

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-01

    Thirty-three abstracts and short papers are presented which describe the current status of research, development, and demonstration of concentrator solar cell technology. Solar concentrators discussed include the parabolic trough, linear focus Fresnel lens, point focus Fresnel lens, and the parabolic dish. Solar cells studied include silicon, GaAs, and AlGaAs. Research on multiple junction cells, combined photovoltaic/thermal collectors, back contact solar cells, and beam splitter modules is described. Concentrator solar cell demonstration programs are reported. Contractor status summaries are given for 33 US DOE concentrator solar cell contracts; a description of the project, project status, and key results to date is included. (WHK)

  15. The Pelican Project. Meeting the needs of children with asthma

    NARCIS (Netherlands)

    Bragt, S.T.W.M. van

    2015-01-01

    The thesis, called ‘Pelican Project: Meeting the Needs of Children with asthma’ describes the importance of including personal treatment goals of children in the care of asthma. Through a health-related quality of life questionnaire, called ‘the Pelican instrument’, the treatment goals for children

  16. Proceedings of the black liquor research program review fifth meeting

    Energy Technology Data Exchange (ETDEWEB)

    1988-09-01

    On June 14--17, 1988 the participants and invited guests of the Cooperative Program in Kraft Recovery gathered in Charleston, South Carolina, to review progress on four major black liquor research programs being executed at the Institute of Paper Chemistry, the University of Maine, the National Bureau of Standards, and the University of Florida. These programs include: (1) Black Liquor Properties; (2) Black Liquor Droplet Formation; (3) Black Liquor Nozzle Evaluation; and (4) Black Liquor Combustion. In addition to the objectives of previous meetings, this meeting made a direct attempt to gather ideas on how to improve our ability to move from new technology concepts to commercial implementation. Also attached is the agenda for the Charleston meeting. The first two days were involved with updates and reviews of the four major black liquor programs. A half day was spent discussing pathways to implementation and developing thoughts on what industry, DOE and academia could do to facilitate commercial implementation of the research results. This publication is a summary of the presentations made in Charleston and the industry responses to the research work. Readers are cautioned that the contents are in-progress updates on the status of the research and do not represent referred technical papers. Any questions regarding the content should be referred to the principal investigators of the project.

  17. Report on the CSC project group meeting on alternative energy resources

    International Nuclear Information System (INIS)

    1977-11-01

    Under its coordinated R and D programme the Commonwealth Science Council in cooperation with the Ministry of Agriculture, Food and Consumer Affairs, Barbados, organized a meeting to identify suitable projects for inter-country collaboration. Specifically the meeting had three aims: 1. Review present state of activities in alternative energy resources and assess small scale energy needs in the region. 2. Identify specific projects for inter-country collaboration. 3. Draft joint project proposals for such collaboration. A small group of experts (Annex VII) from Britain, Canada, USA and CSC secretariat staff made detailed plans for the Barbados meeting. With a view to assessing real energy needs locally, the Group recommended that a study be undertaken in Barbados prior to the meeting. A report on such a study was presented at the meeting. Member countries were also invited to prepare country papers. In addition, following the planning Group's recommendation, several technical papers were prepared. These covered subjects ranging from conceptual aspects to clarify objectives, assumptions and criteria to a review of all alternative energy technologies

  18. 75 FR 9908 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2010-03-04

    ..., Room 4102, MSC 7814, Bethesda, MD 20892, (301) 435-1786, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review [email protected]csr.nih.gov . Name of Committee: Center for Scientific Review Special Emphasis Panel; Program Project...

  19. Human Research Program 2010 Chair Standing Review Panel Meeting

    Science.gov (United States)

    Steinberg, Susan

    2011-01-01

    The 13 Human Research Program (HRP) Standing Review Panel (SRP) Chairs, and in some cases one or two additional panel members (see section XIV, roster) referred to as the Chair (+1) SRP throughout this document, met at the NASA Johnson Space Center (JSC) on December 7, 2010 to allow the HRP Elements and Projects to report on their progress over the past year, their current status, and their plans for the upcoming year based on NASA's current goals and objectives for human space exploration. A large focus of the meeting was also used to discuss integration across the HRP scientific disciplines based on a recommendation from the 2009 HRP SRP review. During the one-day meeting, each of the HRP Elements and Projects presented the changes they made to the HRP Integrated Research Plan (IRP Rev. B) over the last year, and what their top three areas of integration are between other HRP Elements/Projects. The Chair (+1) SRP spent sufficient time addressing the panel charge, either as a group or in a separate closed session, and the Chair (+1) SRP and the HRP presenters and observers, in most cases, had sufficient time to discuss during and after the presentations. The SRP made a final debriefing to the HRP Program Scientist, Dr. John B. Charles, prior to the close of the meeting on December 7, 2010. Overall, the Chair (+1) SRP concluded that most of the HRP Elements/Projects did a commendable job during the past year in addressing integration across the HRP scientific disciplines with the available resources. The Chair (+1) SRP agreed that the idea of integration between HRP Elements/Projects is noble, but believes all parties involved should have the same definition of integration, in order to be successful. The Chair (+1) SRP also believes that a key to successful integration is communication among the HRP Elements/Projects which may present a challenge. The Chair (+1) SRP recommends that the HRP have a workshop on program integration (with HRP Element/Project

  20. Meeting the challenges of developing LED-based projection displays

    Science.gov (United States)

    Geißler, Enrico

    2006-04-01

    The main challenge in developing a LED-based projection system is to meet the brightness requirements of the market. Therefore a balanced combination of optical, electrical and thermal parameters must be reached to achieve these performance and cost targets. This paper describes the system design methodology for a digital micromirror display (DMD) based optical engine using LEDs as the light source, starting at the basic physical and geometrical parameters of the DMD and other optical elements through characterization of the LEDs to optimizing the system performance by determining optimal driving conditions. LEDs have a luminous flux density which is just at the threshold of acceptance in projection systems and thus only a fully optimized optical system with a matched set of LEDs can be used. This work resulted in two projection engines, one for a compact pocket projector and the other for a rear projection television, both of which are currently in commercialization.

  1. Talking in Taejon : regional cooperative agreement project formulation meeting

    International Nuclear Information System (INIS)

    McEwan, A. C.

    1997-01-01

    The International Atomic Energy Agency as part of its Regional Cooperative Agreement (RCA) with countries in east Asia and the neighboring Pacific, has had a project on strengthening radiation protection infrastructures operating for some years. This project has arranged training courses, workshops and other activities on a range of topics related to establishing or improving radiation protection measures and safety of radiation sources in member states of the region. A second 5 year phase of planned activities is to be concluded during 1997, and the value of the project is such that member coutntries proposed its continuation for a further 5 year period commencing in 1998. For this purpose a Task Group took the lead in assembling and evaluating proposals for consideration and approval at a meeting of national coordinators for the project held in Taejon Korea, 24-28 February. The RCA project for Phase III will be titled Enhancement and Harmonisation of Radiation Protection. The meeting of national coordinators from the region represents a unique opportunity for information sharing and cooperation in radiation protection betweem countries. (author)

  2. 76 FR 8381 - Proposal Review for Physics; Notice of Meeting

    Science.gov (United States)

    2011-02-14

    ... NATIONAL SCIENCE FOUNDATION Proposal Review for Physics; Notice of Meeting In accordance with the Federal Advisory Committee Act (Pub. L. 92- 463, as amended), the National Science Foundation announces the following meeting: Name: Proposal Review for the Center for Magnetic Self-Organization in...

  3. 18 CFR 801.4 - Project review.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Project review. 801.4 Section 801.4 Conservation of Power and Water Resources SUSQUEHANNA RIVER BASIN COMMISSION GENERAL POLICIES § 801.4 Project review. (a) The Compact provides generally that no project affecting the water...

  4. 75 FR 71122 - Erie Boulevard Hydropower L.P.; Notice of Scoping Meetings and Environmental Site Review

    Science.gov (United States)

    2010-11-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7518-012--New York] Erie Boulevard Hydropower L.P.; Notice of Scoping Meetings and Environmental Site Review November 15, 2010. Commission staff will be conducting two public scoping meetings and an environmental site review in support...

  5. Contact expert group for international radwaste projects. Fourth meeting

    International Nuclear Information System (INIS)

    1997-06-01

    The Contact Expert Group for International Radwaste Projects is the result of an IAEA seminar on ''International Co-operation on Nuclear Waste Management in the Russian Federation'', 15-17 May 1995, that was requested and sponsored by the Nordic countries. In two working groups at the Seminar, participants from the Russian Federation and 17 countries and international organizations co-operating with the Russian Federation in waste management projects recognized the need for setting up a contact group of experts to assist in co-ordinating their efforts. Such co-ordination would help avoid redundancy and duplication of effort, assure that priority needs were made known to the international community, and provide points of contact to facilitate co-operation. This report is a compilation of the 4. CEG meeting materials, both prepared by the CEG Secretariat and presented by meeting's participants. The materials discussed by the CEG and subsequently modified are presented in the finally approved version. As in the case of previous similar reports, the documentation presented was just compiled without any editing and thus should be considered only as ''working proceedings'' of the meeting

  6. Proceedings of the Advanced Turbine Systems annual program review meeting

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    Goals of the 8-year program are to develop cleaner, more efficient, and less expensive gas turbine systems for utility and industrial electric power generation, cogeneration, and mechanical drive units. During this Nov. 9-11, 1994, meeting, presentations on energy policy issues were delivered by representatives of regulatory, industry, and research institutions; program overviews and technical reviews were given by contractors; and ongoing and proposed future projects sponsored by university and industry were presented and displayed at the poster session. Panel discussions on distributed power and Advanced Gas Systems Research education provided a forum for interactive dialog and exchange of ideas. Exhibitors included US DOE, Solar Turbines, Westinghouse, Allison Engine Co., and GE.

  7. MEET : project action plan for AUMA energy management program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-11-22

    The Municipal Energy Efficiency Trust (MEET) action plan offers a framework to help municipalities in Alberta demonstrate leadership in reducing energy consumption. It sets out targets for energy reductions and the associated capital investment. As more information is compiled from energy audits, the targets will be refined. AUMA and Enmax Energy Corp have partnered to provide energy audits designed to allow all municipalities to undertake energy savings projects. The program is divided into 8 basic categories for energy savings projects including: water and sewage collection, treatment and distribution; recreation centres such as pools and skating rinks; streetlights; office buildings; garages, shops and parking lots; other and innovative projects; municipal audit evaluation support; and, direct grants applied to each project. The estimates for energy savings within each category are provided. The maximum allowable payback period for the project is assumed to be 15 years. Total municipal energy use in Alberta is estimated at 1,100,000 MWh per year. A province wide program will enable AUMA to provide centralized services such as project management and procurement services to address municipal resource constraints and provide some economies of scale for smaller municipalities. AUMA will act as the fund administrator and will set criteria for acceptable projects. The action plan focuses on the energy audit program, municipal facility data collection, municipal staff education, and the establishment of a funding pool. The target for 2002/2003 will be to identify projects with energy savings of at least 15,000 MWh for water treatment and distribution recreation centres for a total capital cost of $13,500,000. 1 tab., 3 figs.

  8. 75 FR 26743 - Pacific Gas and Electric Company; Notice of Environmental Site Review and Technical Meetings To...

    Science.gov (United States)

    2010-05-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12779-005] Pacific Gas and Electric Company; Notice of Environmental Site Review and Technical Meetings To Discuss Information and Monitoring Needs for a License Application for a Pilot Project May 5, 2010. a. Type of Application: Draft Pilot License Application. b. Project N...

  9. Proceedings of the advanced coal-fired power systems `95 review meeting, Volume I

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, H.M.; Mollot, D.J.; Venkataraman, V.K.

    1995-06-01

    This document contains papers presented at The advanced Coal-Fired Power Systems 1995 Review Meeting. Research was described in the areas of: integrated gasification combined cycle technology; pressurized fluidized-bed combustion; externally fired combined cycles; a summary stauts of clean coal technologies; advanced turbine systems and hot gas cleanup. Individual projects were processed separately for the United States Department of Energy databases.

  10. 76 FR 7835 - Great River Hydropower, LLC; Notice of Scoping Meetings and Environmental Site Review and...

    Science.gov (United States)

    2011-02-11

    ... Hydropower, LLC; Notice of Scoping Meetings and Environmental Site Review and Soliciting Scoping Comments.... c. Date filed: July 12, 2010. d. Applicant: Great River Hydropower, LLC. e. Name of Project: Upper... 796-foot-long by 46-foot-wide by 25-foot-high concrete hydropower structure consisting of 30 turbine...

  11. Proceedings of the 24th NSRR technical review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Uetsuka, Hiroshi; Fuketa, Toyoshi; Suzuki, Motoe [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment] [and others

    2001-09-01

    The 24th NSRR Technical Review Meeting was held at Tranomon Pastoral, Tokyo, on November 13 and 14, 2000. The purpose of the meeting was to present and discuss the recent progress of the NSRR program and other LWR fuel safety researches at JAERI. Twenty-one papers, including five by foreign institutes, were presented and discussed regarding fuel behavior during normal operation, reactivity initiated accident (RIA) and loss-of-coolant accident (LOCA) and FP release behavior during severe accident. The meeting was a great help in planning future research and promoting research cooperation. This proceeding contains the papers presented in the meeting. (author)

  12. Financing Renewable Energy Projects in Developing Countries: A Critical Review

    Science.gov (United States)

    Donastorg, A.; Renukappa, S.; Suresh, S.

    2017-08-01

    Access to clean and stable energy, meeting sustainable development goals, the fossil fuel dependency and depletion are some of the reasons that have impacted developing countries to transform the business as usual economy to a more sustainable economy. However, access and availability of finance is a major challenge for many developing countries. Financing renewable energy projects require access to significant resources, by multiple parties, at varying points in the project life cycles. This research aims to investigate sources and new trends in financing RE projects in developing countries. For this purpose, a detail and in-depth literature review have been conducted to explore the sources and trends of current RE financial investment and projects, to understand the gaps and limitations. This paper concludes that there are various internal and external sources of finance available for RE projects in developing countries.

  13. 76 FR 10944 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-02-28

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee will be held Tuesday...

  14. Committees review activities at December meetings

    Science.gov (United States)

    The Education and Human Resources Committee reported having approved participation in the Association for Women Geoscientist's (AWG) national survey. During the summer of 1983 the AWG designed a 75-question survey targeted to women but also applicable to men. The survey consisted of five sections (in addition to such demographics as age, salary, education, job area, and society membership): feelings and attitude toward job, career/family balance, sexual harassment and discrimination, opinions on national energy and conservation policy, and attitude toward AWG. The questionnaire was mailed to AWG members (just over 1000) and to AGU female members (about 1300). Survey participants were asked to give copies to their male colleagues to create a comparison group. About 25% of the 800 responses were from men. The responses were split about 50/50 between AWG and AGU members. The Education and Human Resources Committee will have the results from the survey presented at their next meeting in Cincinnati, May 15.

  15. Integrated Data Collection Analysis (IDCA) Program — Quarterly Review Meeting

    Energy Technology Data Exchange (ETDEWEB)

    Sandstrom, Mary M. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Brown, Geoffrey W. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Warner, Kirstin F. [Naval Surface Warfare Center (IHD-NSWC), Indian Head, MD (United States). Indian Head Division; Sorensen, Daniel N. [Naval Surface Warfare Center (IHD-NSWC), Indian Head, MD (United States). Indian Head Division; Remmers, Daniel L. [Naval Surface Warfare Center (IHD-NSWC), Indian Head, MD (United States). Indian Head Division; Shelley, Timothy J. [Air Force Research Lab. (AFRL/RXQF), Tyndall AFB, FL (United States); Reyes, Jose A. [Applied Research Associates, Inc., Tyndall AFB, FL (United States); Phillips, Jason J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hsu, Peter C. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Reynolds, John G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2011-12-05

    On November 9 and 10, 2011 the IDCA had the annual quarterly meeting. The meeting started the afternoon of the first day with a tour of the NSWC IHD explosives safety testing and analysis facilities. The meeting on the second day addressed the formal sponsor review and further technical issues for the IDCA. Examination of the IHD equipment during the tour, lead to a long discussion on liquid test methods. The discussion resulted in revision of liquid test methods in the impact test and selection of a new liquid test standard. In addition, modifications to friction, spark and thermal test methods were discussed.

  16. Historical methane hydrate project review

    Science.gov (United States)

    Collett, Timothy; Bahk, Jang-Jun; Frye, Matt; Goldberg, Dave; Husebo, Jarle; Koh, Carolyn; Malone, Mitch; Shipp, Craig; Torres, Marta

    2013-01-01

    effort, the U.S. Congress enacted Public Law 106-­‐193, the Methane Hydrate Research and Development Act of 2000. This Act called for the Secretary of Energy to begin a methane hydrate research and development program in consultation with other U.S. federal agencies. At the same time a new methane hydrate research program had been launched in Japan by the Ministry of International Trade and Industry to develop plans for a methane hydrate exploratory drilling project in the Nankai Trough. Since this early start we have seen other countries including India, China, Canada, and the Republic of Korea establish large gas hydrate research and development programs. These national led efforts have also included the investment in a long list of important scientific research drilling expeditions and production test studies that have provided a wealth of information on the occurrence of methane hydrate in nature. The most notable expeditions and projects have including the following:-­‐Ocean Drilling Program Leg 164 (1995)-­‐Japan Nankai Trough Project (1999-­‐2000)-­‐Ocean Drilling Program Leg 204 (2004)-­‐Japan Tokai-­‐oki to Kumano-­‐nada Project (2004)-­‐Gulf of Mexico JIP Leg I (2005)-­‐Integrated Ocean Drilling Program Expedition 311 (2005)-­‐Malaysia Gumusut-­‐Kakap Project (2006)-­‐India NGHP Expedition 01 (2006)-­‐China GMGS Expedition 01 (2007)-­‐Republic of Korea UBGH Expedition 01 (2007)-­‐Gulf of Mexico JIP Leg II (2009)-­‐Republic of Korea UBGH Expedition 02 (2010)-­‐MH-­‐21 Nankai Trough Pre-­‐Production Expedition (2012-­‐2013)-­‐Mallik Gas Hydrate Testing Projects (1998/2002/2007-­‐2008)-­‐Alaska Mount Elbert Stratigraphic Test Well (2007)-­‐Alaska Iġnik Sikumi Methane Hydrate Production Test Well (2011-­‐2012)Research coring and seismic programs carried out by the Ocean Drilling Program (ODP) and Integrated Ocean Drilling Program (IODP), starting with the ODP Leg 164 drilling of the

  17. 78 FR 68044 - Erie Boulevard Hydropower, L.P.; Notice of Scoping Meetings and Environmental Site Review and...

    Science.gov (United States)

    2013-11-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7320-042] Erie Boulevard Hydropower, L.P.; Notice of Scoping Meetings and Environmental Site Review and Soliciting Scoping Comments.... Date filed: July 1, 2013. d. Applicant: Erie Boulevard Hydropower, L.P. e. Name of Project: Chasm...

  18. 78 FR 25309 - Proposal Review Panel Physics; Notice of Meeting

    Science.gov (United States)

    2013-04-30

    ... NATIONAL SCIENCE FOUNDATION Proposal Review Panel Physics; Notice of Meeting In accordance with..., 2013 8:30 a.m.-6:30 p.m. May 15, 2013 8:30 a.m.-6:00 p.m. Place: University of Maryland, College Park... Physics Frontier Center; National Science Foundation, 4201 Wilson Blvd., Arlington, VA 22230. Telephone...

  19. Proceedings of the fuel cells `95 review meeting

    Energy Technology Data Exchange (ETDEWEB)

    George, T.J.

    1995-08-01

    This document contains papers presented at the Fuel Cells `95` Review Meeting. Topics included solid oxide fuel cells; DOE`s transportation program; ARPA advanced fuel cell development; molten carbonate fuel cells; and papers presented at a poster session. Individual papers have been processed separately for the U.S. DOE databases.

  20. Supporting design reviews with pre-meeting virtual reality environments

    NARCIS (Netherlands)

    van den Berg, Marc Casper; Hartmann, Timo; de Graaf, Robin S.

    2017-01-01

    The purpose of this paper is to explore how design reviews can be supported with pre-meeting virtual reality environments. Previous research has not systematically investigated how virtual environments can be used to communicate the design intent (to clients) and to communicate feedback (to design

  1. 76 FR 45004 - Open Meeting of the Taxpayer Advocacy Panel Volunteer Income Tax Assistance Project Committee

    Science.gov (United States)

    2011-07-27

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Volunteer Income Tax Assistance Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Volunteer Income Tax...

  2. 77 FR 67735 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee

    Science.gov (United States)

    2012-11-13

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of Meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and Publications...

  3. 78 FR 78516 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee.

    Science.gov (United States)

    2013-12-26

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee. AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of Meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and Publications...

  4. 76 FR 45007 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee

    Science.gov (United States)

    2011-07-27

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and Publications...

  5. 78 FR 41193 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee

    Science.gov (United States)

    2013-07-09

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and Publications...

  6. 76 FR 22171 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-04-20

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  7. 76 FR 32024 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-06-02

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of Meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  8. 75 FR 33894 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-06-15

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  9. 76 FR 2197 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee.

    Science.gov (United States)

    2011-01-12

    ... Earned Income Tax Credit Project Committee. AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  10. 75 FR 7540 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-02-19

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  11. 76 FR 17995 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-03-31

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  12. 75 FR 18955 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee.

    Science.gov (United States)

    2010-04-13

    ... Earned Income Tax Credit Project Committee. AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  13. 75 FR 25316 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-05-07

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  14. A review of software project testing

    Directory of Open Access Journals (Sweden)

    Jose Calvo-Manzano Villalón

    2016-03-01

    Full Text Available In this article a review of software projects based on a taxonomy project is established, allowing the development team or testing personnel to identify the tests to which the project must be subjected for validation. The taxonomy is focused on identifying software projects according to their technology. To establish the taxonomy, a development method comprised of 5 phases was applied. The developed taxonomy is comprised of 10 categories and 35 subcategories and was validated by a group of information technology (IT managers and professionals in the field of IT through the use of a survey. The results obtained from the survey are subjected to the Mann-Whitney U test, which indicates that the taxonomy is validated. The taxonomy can be implemented in development organizations with or without a testing team that provides a classification for technology projects.

  15. 77 FR 47628 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting...

    Science.gov (United States)

    2012-08-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting Postponement On July 17, 2012, the...), on the Eagle Mountain Pumped Storage Hydroelectric Project. However, the meeting has been postponed...

  16. 76 FR 45006 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-07-27

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Panel Earned Income Tax Credit Project Committee will be held Monday, September 26, 2011, at 3 p.m...

  17. 76 FR 56879 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-09-14

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Earned Income Tax Credit Project Committee will be held Monday, October 24, 2011, at 3 p.m. Eastern Time...

  18. 75 FR 47349 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-08-05

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Income Tax Credit Project Committee will be held Wednesday, September 22, 2010, at 1 p.m. Eastern Time...

  19. 75 FR 62632 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-10-12

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Income Tax Credit Project Committee will be held Wednesday, November 24, 2010, at 1 p.m. Eastern Time via...

  20. 75 FR 39333 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-07-08

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Income Tax Credit Project Committee will be held Wednesday, August 25, 2010, at 1 p.m. Eastern Time via...

  1. 76 FR 63716 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-10-13

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Earned Income Tax Credit Project Committee will be held Monday, November 28, 2011, at 3 p.m. Eastern Time...

  2. 76 FR 37199 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-06-24

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Income Tax Credit Project Committee will be held Monday, August 22, 2011, at 3 p.m. Eastern Time via...

  3. 75 FR 55406 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-09-10

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Income Tax Credit Project Committee will be held Wednesday, October 27, 2010, at 1:00 p.m. Eastern Time...

  4. 76 FR 6188 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-02-03

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Panel Earned Income Tax Credit Project Committee will be held Monday, March 28, 2011, at 2 p.m., Eastern...

  5. Subsurface barrier feasibility evaluation: External review meeting report

    International Nuclear Information System (INIS)

    Lindberg, S.L.; Rouse, J.K.

    1994-12-01

    The Westinghouse Hanford Company -- Tank Waste Remediation System Division (TWRS) Program is evaluating subsurface barrier technologies for potential use in supporting remediation of the Hanford Tank Farms for the US Department of Energy, Richland Operations Office (DOE-RL). An External Review Team (ERT) was assembled to perform an independent technical review of the work performed to-date supporting the evaluation process. A set of draft documents was forwarded to the ERT for their review, and a meeting was held August 10 through 12, 1994, to facilitate comments and resolutions. This document summarizes the meeting, the comments provided by the ERT, and the ongoing work to resolve the comments and support a pending decision by The US Department of Energy, Richland Operations Office; the Washington State Department of Ecology; and the US Environmental Protection Agency

  6. JPL's Approach for Helping Flight Project Managers Meet Today's Management Challenges

    Science.gov (United States)

    Leising, Charles J.

    2004-01-01

    All across NASA project managers are facing tough new challenges. NASA has imposed increased oversight and the number of projects at Centers such as JPL has exploded from a handful of large projects to a much greater number of smaller ones. Experienced personnel are retiring at increasing rates and younger, less experienced managers are being rapidly promoted up the ladder. Budgets are capped, competition among NASA Centers and Federally Funded Research and Development Centers (FFRDCs) has increased significantly and there is no longer any tolerance to cost overruns. On top of all this, implementation schedules have been reduced by 25 to 50% to reduce run-out costs, making it even more difficult to define requirements, validate heritage assumptions and make accurate cost estimates during the early phases of the life-cycle.JPL's executive management, under the leadership of the Associate Director for Flight Projects and Mission Success, have attempted to meet these challenges by improving operations in five areas: (1) increased standardization, where it is judged to have significant benefit; (2) better balance and more effective partnering between projects and the line management; (3) increased infrastructure support; (4) improved management training; and (5) more effective review and oversight.

  7. Design review plan for Multi-Function Waste Tank Facility (Project W-236A)

    International Nuclear Information System (INIS)

    Renfro, G.G.

    1994-01-01

    This plan describes how the Multi-Function Waste Tank Facility (MWTF) Project conducts reviews of design media; describes actions required by Project participants; and provides the methodology to ensure that the design is complete, meets the technical baseline of the Project, is operable and maintainable, and is constructable. Project W-236A is an integrated project wherein the relationship between the operating contractor and architect-engineer is somewhat different than that of a conventional project. Working together, Westinghouse Hanford Company (WHC) and ICF Karser Hanford (ICF KH) have developed a relationship whereby ICF KH performs extensive design reviews and design verification. WHC actively participates in over-the-shoulder reviews during design development, performs a final review of the completed design, and conducts a formal design review of the Safety Class I, ASME boiler and Pressure Vessel Code items in accordance with WHC-CM-6-1, Standard Engineering Practices

  8. 76 FR 67439 - External Peer Review Meeting for Draft Microbial Risk Assessment Guideline: Pathogenic...

    Science.gov (United States)

    2011-11-01

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-ORD-2011-053; FRL-9485-1] External Peer Review Meeting for... review draft does not represent EPA policy. The public may register to attend this peer review meeting as... to consider the comments from the external peer review meeting, along with public comments received...

  9. Results of 6th Review Meeting and Perspective of the 7th Review Meeting of the Convention on Nuclear Safety

    International Nuclear Information System (INIS)

    Lee, Sukho; Kim, Manwoong; You, Jeongwon; Lee, Youngeal

    2017-01-01

    This paper highlighted the objective and role of the Convention on Nuclear Safety organized by the IAEA. The Convention provides Member States to demonstrate and share how to maintain and improve the level of nuclear safety. The results of the 6 th review meeting were implemented for safety improvements and to prepare for 7 th national report. Seven and a half months before the 7 th Review Meeting, the National Report has submitted on steps and measures taken to implement Convention obligations. The Contracting Parties reviewed each other’s reports, and exchanged written questions, written answers and comments. The discussions in the Country Group sessions were generally good with a lively and frank exchange of information. The Country Groups noted the significant measures taken by Contracting Parties to improve nuclear safety and identified a number of good practices to be shared with all Contracting Parties.

  10. Fourth natural analogue working group meeting and Pocos de Caldas project final workshop

    International Nuclear Information System (INIS)

    Come, B.; Chapman, N.A.

    1991-01-01

    The fourth meeting of the CEC-sponsored natural analogue working group (NAWG) was held in Pitlochry, Scotland, from 18 to 22 June 1990, and also included the final workshop of the Pocos de Caldas (Brazil) natural analogue project, sponsored by Nagra (CH), SKB (S) UK-DOE and US-DOE. About 80 specialists attended this meeting, originating from EC Member States and also Australia, Brazil, Canada, Finland, Japan, Sweden, Switzerland and the USA. The IAEA and OCDE-NEA were also represented. This plenary meeting was the opportunity to review and discuss five years of progress and activities of natural analogues in central areas of performance assessment: waste forms and engineered barriers, geochemistry and radionuclide speciation, radionuclide migration and the overall geological context of radwaste disposal. In addition, a feedback session provided the opportunity for regulators and those individuals who had advisory roles to give their views and impressions on the significance of natural analogue research. These proceedings, divided into two sessions, contain 32 technical papers and 14 abstracts of published papers

  11. A quick look at the post accident review meeting (PARM)

    International Nuclear Information System (INIS)

    Dastur, A.; Osborne, R.; Pendergast, D.; Primeau, D.B.; Snell, V.G.; Torgerson, D.

    1986-01-01

    The IAEA sponsored Post-Accident Review Meeting (PARM) for Chernobyl took place in Vienna from August 25 to 29, 1986. A report by the International Nuclear Safety Advisory Group (INSAG) and the group of experts supporting them is under preparation and will be available later in September. In view of the importance of the meeting, this report has been prepared by the AECL Conference delegation to provide more rapid feedback. Since digestion of the information will take much more time, we have attempted to stick to what we heard, avoiding speculation unless absolutely necessary. Since the Chernobyl event was so serious, it is essential that the root causes be identified, in order to avoid a related occurrence. It is necessary that the design and operation of CANDU reactors be carefully reviewed to identify, if any, of the lessons have any relevance. This must be done thoroughly and without complacency

  12. Maximum entropy PDF projection: A review

    Science.gov (United States)

    Baggenstoss, Paul M.

    2017-06-01

    We review maximum entropy (MaxEnt) PDF projection, a method with wide potential applications in statistical inference. The method constructs a sampling distribution for a high-dimensional vector x based on knowing the sampling distribution p(z) of a lower-dimensional feature z = T (x). Under mild conditions, the distribution p(x) having highest possible entropy among all distributions consistent with p(z) may be readily found. Furthermore, the MaxEnt p(x) may be sampled, making the approach useful in Monte Carlo methods. We review the theorem and present a case study in model order selection and classification for handwritten character recognition.

  13. Outcomes of the First Review Meeting of the Joint Convention

    International Nuclear Information System (INIS)

    Linsley, G.

    2003-01-01

    The First Review Meeting of the Joint Convention was held from 3 to 14 November 2003 in Vienna. It was attended by representatives of 33 Contracting Parties (350 persons registered). The scope of applications includes: Waste and spent fuel from the operation of NPPs; Waste from use of radionuclides in medicine and industry; Spent sealed sources; Discharges from regulated nuclear facilities; Waste from mining and processing of uranium. The content of the Joint Convention and obligation of the Contracting Parties are reviewed in the report. The review process is also described. The effectiveness of review mechanism is discussed. Some technical issues are also discussed, such as: the wide variety of long term spent fuel and radioactive waste management policies; clearance; decommissioning; regulatory independence; discharges to the environment; Management of disused sealed sources etc. Some good practices have been identified and comments are given

  14. 76 FR 19147 - Proposal Review Panel for Physics; Notice of Meeting

    Science.gov (United States)

    2011-04-06

    ... NATIONAL SCIENCE FOUNDATION Proposal Review Panel for Physics; Notice of Meeting In accordance... announces the following meeting. Name: LIGO Laboratory Annual Review at Livingston Observatory for Physics...: Partially Closed. Contact Person: Thomas Carruthers, Program Director, Division of Physics, National Science...

  15. 78 FR 16301 - Proposal Review Panel for Physics; Notice of Meeting

    Science.gov (United States)

    2013-03-14

    ... NATIONAL SCIENCE FOUNDATION Proposal Review Panel for Physics; Notice of Meeting In accordance... announces the following meeting. Name: LIGO Annual Review Site Visit at Hanford Observatory for Physics... Physics, National Science Foundation, Arlington, VA (703) 292-4432. [[Page 16302

  16. 75 FR 81315 - Earth Sciences Proposal Review Panel; Notice of Meeting

    Science.gov (United States)

    2010-12-27

    ... NATIONAL SCIENCE FOUNDATION Earth Sciences Proposal Review Panel; Notice of Meeting In accordance... announces the following meeting. Name: Proposal Review Panel in Earth Sciences (1569). Date and Time... Kelz, Program Director, Instrumentation & Facilities Program, Division of Earth Sciences, Room 785...

  17. Krsko periodic safety review project prioritization process

    International Nuclear Information System (INIS)

    Basic, I.; Vrbanic, I.; Spiler, J.; Lambright, J.

    2004-01-01

    Definition of a Krsko Periodic Safety Review (PSR) project is a comprehensive safety review of a plant after last ten years of operation. The objective is a verification by means of a comprehensive review using current methods that Krsko NPP remains safety when judged against current safety objectives and practices and that adequate arrangements are in place to maintain plant safety. This objective encompasses the three main criteria or goals: confirmation that the plant is as safe as originally intended, determination if there are any structures, systems or components that could limit the life of the plant in the foreseeable future, and comparison the plant against modern safety standards and to identify where improvements would be beneficial at justifiable cost. Krsko PSR project is structured in the three phases: Phase 1: Preparation of Detailed 10-years PSR Program, Phase 2: Performing of 10-years PSR Program and preparing of associated documents (2001-2003), and Phase 3: Implementation of the prioritized compensatory measures and modifications (development of associated EEAR, DMP, etc.) after agreement with the SNSA on the design, procedures and time-scales (2004-2008). This paper presents the NEK PSR results of work performed under Phase 2 focused on the ranking of safety issues and prioritization of corrective measures needed for establishing an efficient action plan. Safety issues were identified in Phase 2 during the following review processes: Periodic Safety Review (PSR) task; Krsko NPP Regulatory Compliance Program (RCP) review; Westinghouse Owner Group (WOG) catalog items screening/review; SNSA recommendations (including IAEA RAMP mission suggestions/recommendations).(author)

  18. ERG [Engineering Review Group] review of the SRP [Salt Repository Project] salt irradiation effects program: Technical report

    International Nuclear Information System (INIS)

    Clark, D.E.

    1986-11-01

    The Engineering Review Group (ERG) was established by the Office of Nuclear Waste Isolation (ONWI) to help evaluate engineering-related issues in the US Department of Energy's nuclear waste repository program. The August 1985 meeting of the ERG reviewed the Salt Repository Project (SRP) salt irradiation effects program. This report documents the ERG's comments and recommendations on these subjects and the ONWI response to the specific points raised by the ERG

  19. Report on the third meeting of the project advisory committee (technical) for IAEA/WHO Project EGY/6/004 (Egyptian Cancer Project) 27-29 April 1985, at NEMROCK, Cairo. PACT(3)

    International Nuclear Information System (INIS)

    Taylor, C.B.G.

    1985-06-01

    The Project was launched in March 1983, with the first meeting of the Committee (PACT(I)). It was planned for a duration of four years. Now, after two years experience, PACT(III) met to review results so far and to advise on actions for the remaining two years. Appendix 1 lists those present at the meeting. Since 1983 a Pilot Project has been running at NEMROCK, the Nuclear Medicine and Radiation Oncology Centre at Cairo University Hospital, at which the Project is based. Two training courses have been given, in November 1983 and November 1984, and treatment has been given using protocols developed under the project. PACT(III) examined clinical results obtained so far and made recommendations for the extension of the scheme to other hospitals in Egypt

  20. Proceedings of the seventh annual gasification and gas stream cleanup systems contractors review meeting: Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Ghate, M.R.; Markel, K.E. Jr.; Jarr, L.A.; Bossart, S.J. (eds.)

    1987-08-01

    On June 16 through 19, 1987, METC sponsored the Seventh Annual Gasification and Gas Stream Cleanup Systems Contractors Review Meeting which was held at the Sheraton Lakeview Conference Center in Morgantown, West Virginia. The primary purpose of the meeting was threefold: to review the technical progress and current status of the gasification and gas stream cleanup projects sponsored by the Department of Energy; to foster technology exchange among participating researchers and other technical communities; to facilitate interactive dialogues which would identify research needs that would make coal-based gasification systems more attractive economically and environmentally. More than 310 representatives of Government, academia, industry, and foreign energy research organizations attended the 4-day meeting. Fifty-three papers and thirty poster displays were presented summarizing recent developments in the gasification and gas stream cleanup programs. Volume I covers information presented at sessions 1 through 4 on systems for the production of Co-products and industrial fuel gas, environmental projects, and components and materials. Individual papers have been processed for the Energy Data Base.

  1. 75 FR 36301 - Review and Approval of Projects

    Science.gov (United States)

    2010-06-25

    ... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Parts 806 and 808 Review and Approval of Projects AGENCY... document contains proposed rules that would amend the project review regulations of the Susquehanna River... the scope of withdrawals requiring review and approval; improve notice procedures for all project...

  2. Amoco-US Environmental Protection Agency, pollution prevention project, Yorktown, Virginia: Project peer review. Report of the Peer Review Committee of the Amoco/EPA Pollution Prevention Project at the Yorktown, Virginia refinery

    International Nuclear Information System (INIS)

    Klee, H.; Podar, M.

    1991-01-01

    The Amoco/EPA Pollution Prevention Project involved a number of representatives from federal and Virginia regulatory agencies, and Amoco's refining business. Participants believed that the Project could benefit from a broader perspective than these organizations along might provide. The Project Work Group selected an independent Peer Review Process which was conducted by Resource for the Future (RFF), a Washington DC think tank. A group of technical, policy and environmental experts from diverse backgrounds served as Peer Review members. The Peer Review Committee met on three occasions to discuss (1) the Project Work Plan (2) sampling data and interpretation and (3) project conclusions and recommendations. The focus of the meeting was on the general scope and content of the project

  3. Biomarkers: project update from the GRAPPA 2012 annual meeting.

    Science.gov (United States)

    FitzGerald, Oliver; Mease, Philip J

    2013-08-01

    For members of the Group for Research and Assessment of Psoriasis and Psoriatic Arthritis (GRAPPA), an important goal has been the identification of soluble biomarkers in psoriatic arthritis that might predict the development of radiographic progression. Work over the past year has resulted in approval of a draft protocol, and an announcement is forthcoming of the outcome of an assessment process for centers that applied to manage the project. GRAPPA is now ready to commence formal negotiations with potential funding partners and intends to initiate this project in the near future.

  4. Report of the first meeting of the Project Advisory Committee (Technical) 21-24 March 1983, at NEMROCK, Cairo

    International Nuclear Information System (INIS)

    Taylor, C.B.G.

    1983-05-01

    The Project Advisory Committee (Technical) (PACT) met on 21-24 March 1983, at NEMROCK, Cairo, Egypt, to discuss the joint IAEA/WHO project on Intracavitary Radiation Therapy for Cancer of the Uterus (Egypt/6/004). At this four day meeting the committee (1) identified a well-defined administrative framework in which earlier diagnosis of uterine cancer may be organized, on a limited but firm basis. (2) Agreed on the clinical and dosimetric principles to be followed in implementing the project. (3) Decided on the types and quantities of equipment which it will need in its first two years. (4) Developed the outline of the syllabus for the first training course, and fixed its date (three weeks from 83-10-29). (5) Reviewed the costs which will be incurred in carrying through the project and found them to be consistent with the funds available

  5. ECFA Meeting in May: LEP project changes / Backing for HERA / HEP in Europe

    International Nuclear Information System (INIS)

    Anon.

    1980-01-01

    The European Committee for Future Accelerators held a Plenary Meeting at CERN on 9 May. The representatives of the Universities and Laboratories in the CERN Member States heard presentations on the latest developments concerning the LEP project at CERN. They supported a recommendation on the HERA project at DESY and they endorsed a detailed report on high energy physics in Europe

  6. 78 FR 25263 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2013-04-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002--CA] Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a... Hydroelectric Project. e. All local, state, and federal agencies, tribes, and interested parties, are hereby...

  7. 77 FR 43280 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2012-07-24

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a... Mountain Pumped Storage Hydroelectric Project. e. All local, state, and federal agencies, tribes, and...

  8. Final Report of the Final Meeting of Project Coordinators

    International Nuclear Information System (INIS)

    Cordero Calderon, Carlos F.

    1996-06-01

    The Costa Rican Electricity Institute has always been worried of the verification of the good state of the works and thus to guarantee their operation. For that reason, it has established different sorts of auscultation of the Arenal's Dam. Some investigations have been done to find new methods to improve and to eliminate risks in different works or projects. The Arenal's Dam is one of the greatest engineering works in Costa Rica, it has the Arenal, Corobici and Sandillal Hydroelectric Plants. Furthermore, the irrigation system in the Tempisque River Valley, in the Guanacaste province. One special characteristic of the Site of the Dam, is the near location of the Arenal Volcano, in full activity and located at 6 Km. from the dam. This report has two goals, one is the traditional permanent measurements report for the project, and the other, is to present it as a final work of the Project Arcal XVIII, to the International Atomic Energy Agency. This report analyses the geo-hydraulic, structural and topographic auscultation, as well as the activities accomplished during the ARCAL XVIII /8/018, Application of Tracer Techniques for Leakage in Dams and Damming Project, based on information gathered through the geo-chemical auscultation, until June 1996. (author).30 ills., 80 charts, 35 tabs

  9. Art meets science: The Cosmopolitan Chicken Research Project.

    Science.gov (United States)

    Stinckens, A; Vereijken, A; Ons, E; Konings, P; Van As, P; Cuppens, H; Moreau, Y; Sakai, R; Aerts, J; Goddeeris, B; Buys, N; Vanmechelen, K; Cassiman, J J

    2015-01-01

    The Cosmopolitan Chicken Project is an artistic undertaking of renowned artist Koen Vanmechelen. In this project, the artist interbreeds domestic chickens from different countries aiming at the creation of a true Cosmopolitan Chicken as a symbol for global diversity. The unifying theme is the chicken and the egg, symbols that link scientific, political, philosophical and ethical issues. The Cosmopolitan Chicken Research Project is the scientific component of this artwork. Based on state of the art genomic techniques, the project studies the effect of the crossing of chickens on the genetic diversity. Also, this research is potentially applicable to the human population. The setup of the CC®P is quite different from traditional breeding experiments: starting from the crossbreed of two purebred chickens (Mechelse Koekoek x Poule de Bresse), every generation is crossed with a few animals from another breed. For 26 of these purebred and crossbred populations, genetic diversity was measured (1) under the assumption that populations were sufficiently large to maintain all informative SNP within a generation and (2) under the circumstances of the CCP breeding experiment. Under the first assumption, a steady increase in genetic diversity was witnessed over the consecutive generations, thus indeed indicating the creation of a "Cosmopolitan Chicken Genome". However, under the conditions of the CCP, which reflects the reality within the human population, diversity is seen to fluctuate within given boundaries instead of steadily increasing. A reflection on this might be that this is because, in humans, an evolutionary optimum in genetic diversity is reached. Key words.

  10. Minnesota STAR Project: Meeting the Needs of Struggling Adult Readers

    Science.gov (United States)

    Johnson, Kimberly A.; Frank, Margaret M.

    2012-01-01

    This paper reports on findings and implications from a two-year evaluation of the Minnesota STudent Achievement in Reading (STAR) Project. This long-term, job-embedded, professional development activity is provided for Minnesota Adult Basic Education (ABE) practitioners serving intermediate-level adult students reading between 4.0 to 8.9 grade…

  11. 75 FR 70951 - Proposal Review Panel for Physics; Notice of Meeting

    Science.gov (United States)

    2010-11-19

    ... NATIONAL SCIENCE FOUNDATION Proposal Review Panel for Physics; Notice of Meeting In accordance... announces the following meeting. Name: LIGO Laboratory Annual Review at Hanford Observatory for Physics... Physics, National Science Foundation, (703) 292-7373. Purpose of Meeting: To provide an evaluation of the...

  12. Hybrid petacomputing meets cosmology: The Roadrunner Universe project

    International Nuclear Information System (INIS)

    Habib, Salman; Pope, Adrian; Lukic, Zarija; Daniel, David; Fasel, Patricia; Desai, Nehal; Heitmann, Katrin; Hsu, Chung-Hsing; Ankeny, Lee; Mark, Graham; Bhattacharya, Suman; Ahrens, James

    2009-01-01

    The target of the Roadrunner Universe project at Los Alamos National Laboratory is a set of very large cosmological N-body simulation runs on the hybrid supercomputer Roadrunner, the world's first petaflop platform. Roadrunner's architecture presents opportunities and difficulties characteristic of next-generation supercomputing. We describe a new code designed to optimize performance and scalability by explicitly matching the underlying algorithms to the machine architecture, and by using the physics of the problem as an essential aid in this process. While applications will differ in specific exploits, we believe that such a design process will become increasingly important in the future. The Roadrunner Universe project code, MC 3 (Mesh-based Cosmology Code on the Cell), uses grid and direct particle methods to balance the capabilities of Roadrunner's conventional (Opteron) and accelerator (Cell BE) layers. Mirrored particle caches and spectral techniques are used to overcome communication bandwidth limitations and possible difficulties with complicated particle-grid interaction templates.

  13. The Halden Reactor Project workshop meeting on control room development

    International Nuclear Information System (INIS)

    Miberg, Ann Britt; Green, Marie; Haukenes, Hanne; Larsen, Marit; Seim, Lars Aage; Veland, Oeystein

    1999-03-01

    The 'Control Room Development' workshop was organised in. Halden, November 5-6, 1998. The purpose of the workshop was to bring forward recommendations for the future use of HAMMLAB with respect to control room development. The workshop comprised thirteen presentations summarising current issues and status in control room development projects and related projects. Following the presentations, five working groups were formed. The purpose of the working groups was to establish a set of recommendations for the future use of HAMMLAB. Each working group developed a set of recommendations. The outcomes of the working groups' discussions were summarised in plenum by the working group chairs. During the workshop, all participants excluding the Halden Project staff were asked to fill in a questionnaire indicating which research topics they found most interesting to pursue in future HAMMLAB research. The purpose of this report is to summarise the workshop participants' presentations, the working groups' discussions, and the recommendations given by the workshop participants concerning the future use of HAMMLAB (author) (ml)

  14. 75 FR 80511 - Center for Scientific Review; Notice of Closed Meeting

    Science.gov (United States)

    2010-12-22

    ...: Cognition and Perception. Date: January 19-20, 2011. Time: 12 p.m. to 6 p.m. Agenda: To review and evaluate... (Virtual Meeting). Contact Person: Weijia Ni, PhD, Scientific Review Officer, Center for Scientific Review...

  15. Progress Report 15, December 1979-April 1980, and proceedings of the fifteenth Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period December 1979 to April 1980 is reported. Reports on project analysis and integration; technology development in silicon material, large-area silicon sheet and encapsulation; production process and equipment development; engineering; and operations are included. Also, a report on, and copies of visual presentations made at, the Project Integration Meeting held April 2 and 3, 1980, are included.

  16. 77 FR 58526 - Pacific Fishery Management Council; Public Meeting; Work Session To Review Proposed Salmon...

    Science.gov (United States)

    2012-09-21

    ... Fishery Management Council; Public Meeting; Work Session To Review Proposed Salmon Methodology Changes...), Commerce. ACTION: Notice of a public meeting. SUMMARY: The Pacific Fishery Management Council's Salmon Technical Team (STT), Scientific and Statistical Committee (SSC) Salmon Subcommittee, and Model Evaluation...

  17. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab

  18. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-09

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab.

  19. Implementing Family Meetings Into a Respiratory Care Unit: A Care and Communication Quality Improvement Project.

    Science.gov (United States)

    Loeslie, Vicki; Abcejo, Ma Sunnimpha; Anderson, Claudia; Leibenguth, Emily; Mielke, Cathy; Rabatin, Jeffrey

    Substantial evidence in critical care literature identifies a lack of quality and quantity of communication between patients, families, and clinicians while in the intensive care unit. Barriers include time, multiple caregivers, communication skills, culture, language, stress, and optimal meeting space. For patients who are chronically critically ill, the need for a structured method of communication is paramount for discussion of goals of care. The objective of this quality improvement project was to identify barriers to communication, then develop, implement, and evaluate a process for semistructured family meetings in a 9-bed respiratory care unit. Using set dates and times, family meetings were offered to patients and families admitted to the respiratory care unit. Multiple avenues of communication were utilized to facilitate attendance. Utilizing evidence-based family meeting literature, a guide for family meetings was developed. Templates were developed for documentation of the family meeting in the electronic medical record. Multiple communication barriers were identified. Frequency of family meeting occurrence rose from 31% to 88%. Staff satisfaction with meeting frequency, meeting length, and discussion of congruent goals of care between patient/family and health care providers improved. Patient/family satisfaction with consistency of message between team members; understanding of medications, tests, and dismissal plan; and efficacy to address their concerns with the medical team improved. This quality improvement project was implemented to address the communication gap in the care of complex patients who require prolonged hospitalizations. By identifying this need, engaging stakeholders, and developing a family meeting plan to meet to address these needs, communication between all members of the patient's care team has improved.

  20. Report on the second meeting of the project advisory committee (technical) for IAEA/WHO project EGY/6/004 (Egyptian Cancer Project) 3-9 April 1984, at NEMROCK, Cairo

    International Nuclear Information System (INIS)

    Taylor, C.G.B.

    1984-07-01

    The purpose of the meeting was to review the first year's work and make recommendations for the future. The Committee dealt mainly with the Training Course, the selection of cases suitable for treatment by simple means, the revision of treatment notes and protocols, planning for the cytology (early diagnosis) programme, the collection and manipulation of data, the extension of the Project in Egypt, and its possible extension to other countries

  1. Urban Agriculture in Thessaloniki. An academic project meets reality

    Directory of Open Access Journals (Sweden)

    Eleftheria Gavrilidou

    2015-12-01

    Full Text Available Nearly all projects with Urban Agriculture (UA impact in Western Europe, in the USA, and in the Developing World are started and thought by single initiatives. In so-called “bottom-up” processes of small scale, they gain energy and power by a fast and none formalized implementation. A master studio project at the Aristotle University of Thessaloniki, “Red and Green”, presents in contrast a proposal for a huge inner city area with focus on UA as generator for a socio-economic transformation towards a green economy based on social community spirit, considering in particular the crisis situation in Greece. The approach which combines the idea of integrating both top-down and bottom-up forces, attempts an integration of permanent and temporarily elements, and by this, the master plan searches qualities as an innovative planning tool. After a phase of intensive dissemination and evaluation on international level with encouraging attentiveness and recognition, a strategy for a realization in steps was created by KIPOS3, a start-up initiative organized by a group of master students to bring in the city of Thessaloniki the concept a common garden manageable by the residents under also the Municipality stewardship. A widespread network of small fallow islands in the city of Thessaloniki was detected and in a process of “mapping the city” several lots were analyzed referring for good chances of implementation. The description of the long way of discussions with landowners, the municipality and potentially users, the difficulties and obstacles, documents once more the initiators strong will and immense energy, which is necessary for a successful start-up. With financial support of a Greek Fellowship a first garden was created in 2015. The history of KIPOS3 garden in Thessaloniki consists finally a useful lesson on the role of “foodscape” on the reactivation of inactive institutions and communities, a lesson of resilience in a city of deep

  2. Expert Meeting Report: Key Innovations for Adding Energy Efficiency to Maintenance Projects

    Energy Technology Data Exchange (ETDEWEB)

    Wood, A.; Wiehagen, J.

    2012-09-01

    This report describes an expert meeting hosted by the Building America research team NAHB Research Center, which was held on February 8, 2012, in Orlando, Florida. The topic, Key Innovations for Adding Energy Efficiency to Maintenance Projects, was intended to provide direction to more focused efforts to increase the efficiency of existing homes; in this meeting, the focus was specifically for re-roofing and the opportunities for adding energy efficiency upgrades during this major home repair activity.

  3. Proceedings of the Fuel Cells `97 Review Meeting

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-01-01

    The Federal Energy Technology Center (FETC) sponsored the Fuel Cells '97 Review Meeting on August 26-28, 1997, in Morgantown, West Virginia. The purpose of the meeting was to provide an annual forum for the exchange of ideas and discussion of results and plans related to the research on fuel cell power systems. The total of almost 250 conference participants included engineers and scientists representing utilities, academia, and government from the U.S. and eleven other countries: Canada, China, India, Iran, Italy, Japan, Korea, Netherlands, Russia, Taiwan, and the United Kingdom. On first day, the conference covered the perspectives of sponsors and end users, and the progress reports of fuel-cell developers. Papers covered phosphoric, carbonate, and solid oxide fuel cells for stationary power applications. On the second day, the conference covered advanced research in solid oxide and other fuel cell developments. On the third day, the conference sponsored a workshop on advanced research and technology development. A panel presentation was given on fuel cell opportunities. Breakout sessions with group discussions followed this with fuel cell developers, gas turbine vendors, and consultants.

  4. 77 FR 75915 - Review and Approval of Projects

    Science.gov (United States)

    2012-12-26

    ... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Part 806 Review and Approval of Projects AGENCY... document contains proposed rules that would amend the project review regulations of the Susquehanna River... set forth in this proposed rulemaking is to make further modifications to the Commission's project...

  5. The Ins and Outs of Viral Infection: Keystone Meeting Review

    Directory of Open Access Journals (Sweden)

    Sara W. Bird

    2014-09-01

    Full Text Available Newly observed mechanisms for viral entry, assembly, and exit are challenging our current understanding of the replication cycle of different viruses. To address and better understand these mechanisms, a Keystone Symposium was organized in the snowy mountains of Colorado (“The Ins and Outs of Viral Infection: Entry, Assembly, Exit, and Spread”; 30 March–4 April 2014, Beaver Run Resort, Breckenridge, Colorado, organized by Karla Kirkegaard, Mavis Agbandje-McKenna, and Eric O. Freed. The meeting served to bring together cell biologists, structural biologists, geneticists, and scientists expert in viral pathogenesis to discuss emerging mechanisms of viral ins and outs. The conference was organized around different phases of the viral replication cycle, including cell entry, viral assembly and post-assembly maturation, virus structure, cell exit, and virus spread. This review aims to highlight important topics and themes that emerged during the conference.

  6. Proceedings of the seventh annual gasification and gas stream cleanup systems contractors review meeting: Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    Ghate, M.R.; Markel, K.E. Jr.; Jarr, L.A.; Bossart, S.J. (eds.)

    1987-08-01

    On June 16 through 19, 1987, METC sponsored the Seventh Annual Gasification and Gas Stream Cleanup Systems Contractors Review Meeting which was held at the Sheraton Lakeview Conference Center in Morgantown, West Virginia. The primary purpose of the meeting was threefold: to review the technical progress and current status of the gasification and gas stream cleanup projects sponsored by the Department of Energy; to foster technology exchange among participating researchers and other technical communities; to facilitate interactive dialogues which would identify research needs that would make coal-based gasification systems more attractive economically and environmentally. More than 310 representatives of Government, academia, industry, and foreign energy research organizations attended the 4-day meeting. Fifty-three papers and thirty poster dsplays were presented summarizing recent developments in the gasification and gas stream cleanup programs. Volume II covers papers presented at sessions 5 and 6 on system for the production of synthesis gas, and on system for the production of power. All papers have been processed for inclusion in the Energy Data Base.

  7. Review of PV Inverter Technology Cost and Performance Projections

    Energy Technology Data Exchange (ETDEWEB)

    Navigant Consulting Inc.

    2006-01-01

    The National Renewable Energy Laboratory (NREL) has a major responsibility in the implementation of the U.S. Department of Energy's (DOE's) Solar Energy Technologies Program. Sandia National Laboratories (SNL) has a major role in supporting inverter development, characterization, standards, certifications, and verifications. The Solar Energy Technologies Program recently published a Multiyear Technical Plan, which establishes a goal of reducing the Levelized Energy Cost (LEC) for photovoltaic (PV) systems to $0.06/kWh by 2020. The Multiyear Technical Plan estimates that, in order to meet the PV system goal, PV inverter prices will need to decline to $0.25-0.30 Wp by 2020. DOE determined the need to conduct a rigorous review of the PV Program's technical and economic targets, including the target set for PV inverters. NREL requested that Navigant Consulting Inc.(NCI) conduct a review of historical and projected cost and performance improvements for PV inverters, including identification of critical barriers identified and the approaches government might use to address them.

  8. Atmospheric Ionizing Radiation (AIR) Project Review

    Science.gov (United States)

    Singleterry, R. C., Jr.; Wilson, J. W.; Whitehead, A. H.; Goldhagen, P. E.

    1999-01-01

    The National Council on Radiation Protection and Measurement (NCRP) and the National Academy of Science (NAS) established that the uncertainty in the data and models associated with the high-altitude radiation environment could and should be reduced. In response, the National Aeronautics and Space Administration (NASA) and the U.S. Department of Energy Environmental Measurements Laboratory (EML) created the Atmospheric Ionizing Radiation (AIR) Project under the auspices of the High Speed Research (HSR) Program Office at the Langley Research Center. NASA's HSR Program was developed to address the potential of a second-generation supersonic transport. A critical element focussed on the environmental issues, including the threat to crew and passengers posed by atmospheric radiation. Various international investigators were solicited to contribute instruments to fly on an ER-2 aircraft at altitudes similar to those proposed for the High Speed Civil Transport (HSCT). A list of participating investigators, their institutions, and instruments with quantities measured is presented. The flight series took place at solar minimum (radiation maximum) with northern, southern, and east/west flights. The investigators analyzed their data and presented preliminary results at the AIR Workshop in March, 1998. A review of these results are included.

  9. Team self-regulation and meeting deadlines in project teams: antecedents and effects of temporal consensus

    NARCIS (Netherlands)

    Gevers, J.M.P.; van Eerde, W.; Rutte, C.G.

    2009-01-01

    In a longitudinal study among 48 project teams, we investigated how temporal consensus (i.e., the extent to which team members have a shared understanding of the temporal aspects of their collective task) affects the ability of teams to establish coordinated action and meet deadlines. In addition,

  10. 78 FR 26358 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2013-05-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a... Policy and Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric...

  11. Moving toward the automation of the systematic review process: a summary of discussions at the second meeting of International Collaboration for the Automation of Systematic Reviews (ICASR).

    Science.gov (United States)

    O'Connor, Annette M; Tsafnat, Guy; Gilbert, Stephen B; Thayer, Kristina A; Wolfe, Mary S

    2018-01-09

    The second meeting of the International Collaboration for Automation of Systematic Reviews (ICASR) was held 3-4 October 2016 in Philadelphia, Pennsylvania, USA. ICASR is an interdisciplinary group whose aim is to maximize the use of technology for conducting rapid, accurate, and efficient systematic reviews of scientific evidence. Having automated tools for systematic review should enable more transparent and timely review, maximizing the potential for identifying and translating research findings to practical application. The meeting brought together multiple stakeholder groups including users of summarized research, methodologists who explore production processes and systematic review quality, and technologists such as software developers, statisticians, and vendors. This diversity of participants was intended to ensure effective communication with numerous stakeholders about progress toward automation of systematic reviews and stimulate discussion about potential solutions to identified challenges. The meeting highlighted challenges, both simple and complex, and raised awareness among participants about ongoing efforts by various stakeholders. An outcome of this forum was to identify several short-term projects that participants felt would advance the automation of tasks in the systematic review workflow including (1) fostering better understanding about available tools, (2) developing validated datasets for testing new tools, (3) determining a standard method to facilitate interoperability of tools such as through an application programming interface or API, and (4) establishing criteria to evaluate the quality of tools' output. ICASR 2016 provided a beneficial forum to foster focused discussion about tool development and resources and reconfirm ICASR members' commitment toward systematic reviews' automation.

  12. Meeting challenges through good practice. Using the highlights from the third review meeting of the Convention on Nuclear Safety to improve national regulatory systems

    International Nuclear Information System (INIS)

    Keen, L.J.; Cameron, J.K.

    2006-01-01

    The third review meeting of the Convention on Nuclear Safety (CNS), held in April 2005, demonstrated collective progress on ensuring worldwide nuclear safety. The Contracting Parties highlighted areas of focus to be brought back to the fourth review meeting and also committed to a continuity process to revitalize the review processes under the CNS. Specific progress has been achieved in the first year since the conclusion of the third review meeting, but further commitment to progress is required, by the Contracting Parties and the Secretariat of the IAEA, over the next year, especially if changes to the review processes are to be achieved for the fourth review meeting in 2008. (author)

  13. 78 FR 50144 - Rehabilitation Research and Development Service Scientific Merit Review Board; Notice of Meetings

    Science.gov (United States)

    2013-08-16

    ... Review Board; Notice of Meetings The Department of Veterans Affairs (VA) gives notice under the Federal... Development Service Scientific Merit Review Board will meet from 8 a.m. to 5 p.m. on the dates indicated below: Subcommittee Date(s) Location Career Development Award Program.... August 6, 2013........ VHA National...

  14. 76 FR 66998 - Proposal Review Panel for Physics; Notice of Meeting

    Science.gov (United States)

    2011-10-28

    ... NATIONAL SCIENCE FOUNDATION Proposal Review Panel for Physics; Notice of Meeting In accordance... announces the following meeting. Name: LIGO Annual Review Site Visit at Hanford Observatory for Physics...: Partially Closed. Contact Person: Thomas Carruthers, Program Director, Division of Physics, National Science...

  15. 77 FR 14441 - Proposal Review Panel for Physics; Notice of Meeting

    Science.gov (United States)

    2012-03-09

    ... NATIONAL SCIENCE FOUNDATION Proposal Review Panel for Physics; Notice of Meeting In accordance... announces the following meeting. Name: LIGO Annual Review Site Visit at Hanford Observatory for Physics...: Partially Closed. Contact Person: Thomas Carruthers, Program Director, Division of Physics, National Science...

  16. 77 FR 69505 - Proposal Review Panel for Physics; Notice of Meeting

    Science.gov (United States)

    2012-11-19

    ... NATIONAL SCIENCE FOUNDATION Proposal Review Panel for Physics; Notice of Meeting In accordance with the Federal Advisory Committee Act (Pub. L. 92- 463, as amended), the National Science Foundation announces the following meeting. Name: LIGO Operations Proposal and Annual Review in Physics (1208). Date...

  17. 77 FR 60116 - Human Studies Review Board; Notification of a Public Meeting

    Science.gov (United States)

    2012-10-02

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-ORD-2012-0718; FRL-9736-4] Human Studies Review Board; Notification of a Public Meeting AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: The EPA Office of the Science Advisor announces a public meeting of the Human Studies Review Board to...

  18. 78 FR 57383 - Human Studies Review Board; Notification of a Public Meeting

    Science.gov (United States)

    2013-09-18

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-ORD-2013-0626; FRL-9900-98-ORD] Human Studies Review Board; Notification of a Public Meeting AGENCY: U.S. Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: The EPA Office of the Science Advisor announces a public meeting of the Human Studies Review Board to...

  19. 77 FR 74004 - Human Studies Review Board; Notification of a Public Meeting

    Science.gov (United States)

    2012-12-12

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-ORD-2012-0892; FRL-9761-4] Human Studies Review Board; Notification of a Public Meeting AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: The EPA Office of the Science Advisor announces a public meeting of the Human Studies Review Board to...

  20. 76 FR 59697 - Human Studies Review Board (HSRB); Notification of a Public Meeting

    Science.gov (United States)

    2011-09-27

    ... public meeting of the Human Studies Review Board (HSRB) to advise the Agency on EPA's scientific and... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-ORD-2011-0693; FRL-9472-4] Human Studies Review Board (HSRB); Notification of a Public Meeting AGENCY: Environmental Protection Agency (EPA). ACTION: Notice...

  1. 76 FR 80938 - Human Studies Review Board; Notification of a Public Meeting

    Science.gov (United States)

    2011-12-27

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-ORD-2011-0954; FRL-9611-6] Human Studies Review Board; Notification of a Public Meeting AGENCY: U.S. Environmental Protection Agency. ACTION: Notice. SUMMARY: The EPA Office of the Science Advisor announces a public meeting of the Human Studies Review Board to advise the...

  2. 76 FR 17121 - Human Studies Review Board (HSRB); Notification of a Public Meeting

    Science.gov (United States)

    2011-03-28

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-ORD-2011-0124; FRL-9287-1] Human Studies Review Board (HSRB); Notification of a Public Meeting AGENCY: Environmental Protection Agency (EPA). ACTION: Notice... public meeting of the HSRB to advise the Agency on EPA's scientific and ethical reviews of research with...

  3. 75 FR 15460 - Proposal Review Panel for Physics; Notice of Meeting

    Science.gov (United States)

    2010-03-29

    ... NATIONAL SCIENCE FOUNDATION Proposal Review Panel for Physics; Notice of Meeting In accordance with the Federal Advisory Committee Act (Pub. L. 92- 463, as amended), the National Science Foundation announces the following meeting. Name: Proposal Review Panel for Physics, LIGO Site Visit in Louisiana (1208...

  4. 78 FR 15373 - Center for Scientific Review; Notice of Closed Meeting

    Science.gov (United States)

    2013-03-11

    ....S.C. App.), notice is hereby given of the following meeting. The meeting will be closed to the public in accordance with the provisions set forth in sections 552b(c)(4) and 552b(c)(6), Title 5 U.S.C...). Contact Person: Yi-Hsin Liu, Ph.D., Scientific Review Officer, Center for Scientific Review, National...

  5. 76 FR 36931 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2011-06-23

    ... U.S.C. App.), notice is hereby given of the following meetings. The meetings will be closed to the public in accordance with the provisions set forth in sections 552b(c)(4) and 552b(c)(6), Title 5 U.S.C...: Yi-Hsin Liu, PhD, Scientific Review Officer, Center for Scientific Review, National Institutes of...

  6. Proceedings of the fuel cells 1994 contractors review meeting

    Science.gov (United States)

    Carpenter, C. P., II; Mayfield, M. J.

    1994-08-01

    METC annually sponsors this conference to provide a forum for energy executives, engineers, etc. to discuss advances in fuel cell research and development projects, to exchange ideas with private sector attendees, and to review relevant results in fuel cell technology programs. Two hundred and three people from industry, academia, and Government attended. The conference attempts to showcase the partnerships with the Government and with industry, by seeking activity participation and involvement from the Office of Energy Efficiency and Renewable Energy, EPRI, GRI, and APRA. In addition to sessions on fuel cells (solid oxide, molten carbonate, etc.) for stationary electric power generation, sessions on US DOE's Fuel Cell Transportation Program and on DOD/APRA's fuel cell logistic fuel program were presented. In addition to the 29 technical papers, an abstract of an overview of international fuel cell development and commercialization plans in Europe and Japan is included. Selected papers were indexed separately for inclusion in the Energy Science and Technology Database.

  7. Meeting embryonic requirements of broilers throughout incubation: a review

    Directory of Open Access Journals (Sweden)

    R Molenaar

    2010-09-01

    Full Text Available During incubation of chicken embryos, environmental conditions, such as temperature, relative humidity, and CO2 concentration, must be controlled to meet embryonic requirements that change during the different phases of embryonic development. In the current review, the effects of embryo temperature, egg weight loss, and CO2 concentration on hatchability, hatchling quality, and subsequent performance are discussed from an embryonic point of view. In addition, new insights related to the incubation process are described. Several studies have shown that a constant eggshell temperature (EST of 37.5 to 38.0°C throughout incubation results in the highest hatchability, hatchling quality, and subsequent performance. Egg weight loss must be between 6.5 and 14.0% of the initial egg weight, to obtain an adequate air cell size before the embryo internally pips. An increased CO2 concentration during the developmental phase of incubation (first 10 days can accelerate embryonic development and hatchability, but the physiological mechanisms of this acceleration are not completely understood. Effects of ar increased CO2 concentration during late incubation also need further investigation. The preincubation warming profile, thermal manipulation, and in ovo feeding are new insights related to the incubation process and show that the optimal situation for the embryo during incubation highly depends on the conditions of the eggs before (storage duration and during incubation (environmental conditions and on the conditions of the chickens after hatching (environmental temperature.

  8. 75 FR 62630 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee

    Science.gov (United States)

    2010-10-12

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and...

  9. 75 FR 39330 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee

    Science.gov (United States)

    2010-07-08

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and...

  10. 75 FR 55404 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee

    Science.gov (United States)

    2010-09-10

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and...

  11. 77 FR 30591 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-05-23

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face [[Page 30592... meeting will be held Thursday, June 7 from 8:00 a.m.-5:00 p.m. Eastern Time and Friday, June 8 from 8:00 a...

  12. Status of India's population education programme--the subject of tripartite projects review and annual country review.

    Science.gov (United States)

    1981-12-01

    A 3-step monitoring of India's population education program was undertaken in 1981 in order to determine the level of implementation and progress of the program. This monitoring program, conducted by the Unesco Mobile Team in collaboration with other institutions, followed 3 procedures: Project Progress Report (PPR); Tripartite Project Review (TPR); and Annual Country Review (ACR). The review meetings of the 10 state population education projects were organized at Chandigarh and Madras during August. The states covered in the review were Bihar, Haryana, Madhaya Pradesh, Punjab, Rajasthan, Chandigarh, Gujarat, Karnataka, Maharashtra, and Tamil Nadu. The Tripartite Review identified the following as problems which were hindering the smooth implementation of the population education program: 1) difficulty in spending funds unless certain formalities were completed by the governments of the states; 2) administrative problems such as getting printing paper for instructional materials, waiving the sales tax for equipment to be purchased under the project, and uncertainty regarding the admissible rates of per diem to be paid to the participants in various training programs; 3) the lack of experience of project staff; 4) problems created by having more than 1 cell in a state such as Rajasthan; and 5) an inadequate time frame within which the project should complete all its activities and make population education an integral part of the school system. The following were among the recommendations made: 1) the Project should be made coterminous with the 6th Five-Year Plan up to March 31, 1985; and 2) there should be only 1 Population Education Cell in every state. Among the points discussed at the annual country review, held during October, were the following: rephasing of the program from a 3 to 5 year project to synchronize it with the 6th plan; and the need for additional funds in view of inflation.

  13. Field review of fish habitat improvement projects in central Idaho

    International Nuclear Information System (INIS)

    Beschta, R.L.; Griffith, J.; Wesche, T.A.

    1993-05-01

    The goal of this field review was to provide information to the Bonneville Power Administration (BPA) regarding previous and ongoing fish habitat improvement projects in central Idaho. On July 14, 1992, the review team met at the Sawtooth National Recreation Area office near Ketchum, Idaho, for a slide presentation illustrating several habitat projects during their construction phases. Following the slide presentation, the review team inspected fish habitat projects that have been implemented in the last several years in the Stanley Basin and adjacent valleys. At each site the habitat project was described to the field team and a brief period for project inspection followed. The review team visited approximately a dozen sites on the Challis, Sawtooth, and Boise National Forests over a period of approximately two and a half days. There are two objectives of this review namely to summarize observations for specific field sites and to provide overview commentary regarding the BPA habitat improvement program in central Idaho

  14. Report of the 52. meeting of the Superior Council of the Nuclear Safety and Information (project)

    International Nuclear Information System (INIS)

    2000-01-01

    Since june 2000, the CSSIN (Superior Council on Nuclear Safety and Information) decided to present the meeting of its sessions, on the Internet site of the Nuclear Safety Authority. This document is the meeting project concerning the session of the 27 june 2000. The following subjects have been treated: the Blayais accident and its consequences; the Euratom Directive transposition on the workers and people protection; methodology and organization of the CSSIN concerning the civil nuclear installations and the radiation protection; actualization of the CSSIN heading in the Internet site of the Nuclear Safety Authority. (A.L.B.)

  15. 75 FR 33893 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-06-15

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  16. 75 FR 55405 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-09-10

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  17. 75 FR 18957 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-04-13

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  18. 75 FR 47348 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-08-05

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  19. 75 FR 62630 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-10-12

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  20. 75 FR 7539 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-02-19

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  1. 75 FR 11999 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-03-12

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  2. 75 FR 39331 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-07-08

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  3. 75 FR 4140 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-01-26

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  4. 77 FR 37101 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-06-20

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  5. 77 FR 61053 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-10-05

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods... Service Methods Project Committee will be held Tuesday, November 13, 2012, at 2:00 p.m. Eastern Time via...

  6. 77 FR 47166 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-08-07

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods... Service Methods Project Committee will be held Tuesday, September 11, 2012, at 2 p.m. Eastern Time via...

  7. 77 FR 8328 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-02-14

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods... Panel Face-to-Face Service Methods Project Committee will be held Tuesday, March 13, 2012, at 2 p.m...

  8. 76 FR 78342 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2011-12-16

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of Meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods... Service Methods Project Committee will be held Tuesday, January 10, 2012, at 2 p.m. Eastern Time via...

  9. 77 FR 2611 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-01-18

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods... Service Methods Project Committee will be held Tuesday, February 14, 2012, at 2 p.m. Eastern Time via...

  10. 77 FR 40411 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-07-09

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  11. 77 FR 21157 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-04-09

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  12. 77 FR 55525 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-09-10

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  13. 75 FR 11169 - Reedsport OPT Wave Park Project; Reedsport OPT Wave Park; LLC Notice of Scoping Meetings and...

    Science.gov (United States)

    2010-03-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12713-002] Reedsport OPT Wave Park Project; Reedsport OPT Wave Park; LLC Notice of Scoping Meetings and Environmental Site...: Reedsport OPT Wave Park, LLC. e. Name of Project: Reedsport OPT Wave Park Project. [[Page 11170

  14. 76 FR 20323 - Hydrographic Services Review Panel Meeting

    Science.gov (United States)

    2011-04-12

    ... most current meeting agenda. Times and agenda topics are subject to change. FOR FURTHER INFORMATION...:// nauticalcharts.noaa.gov/ocslhsro/hsro.htm . SUPPLEMENTARY INFORMATION: The meeting will be open to the public and...) Improve the quality and delivery of navigation products and services; (2) maximize the societal value of...

  15. Post-project market review as a tool for stimulating commercialisation of knowledge creation projects

    NARCIS (Netherlands)

    Bout, L.Y.; Lombaers, J.H.M.; Constantinides, E.; Weerd-Nederhof, P.C. de

    2009-01-01

    Post-Project Reviews are mainly used as a tool to improve organisational learning (Busby, 1999; von Zedtwitz, 2002). However, the concept of post-project review can also be used as a tool to identify new market potential and to hand over technical knowledge from technical to marketing personnel (von

  16. Post-Project Market Review as a Tool for Stimulating Commercialisation of Knowledge Creation Projects

    NARCIS (Netherlands)

    Bout, Y.; Lombaers, Jaap H.M.; Constantinides, Efthymios; Fisscher, O.A.M.; de Weerd-Nederhof, Petronella C.; Oakey, R.; Groen, A.; Cook, G.; van der Sijde, P.

    2009-01-01

    Post-Project Reviews are mainly used as a tool to improve organisational learning (Busby, 1999; von Zedtwitz, 2002). However, post-project reviews can also be used as a tool to identify new market potential and to hand over technical knowledge from technical to marketing personnel (von Zedtwitz,

  17. Internet and Audiology: A Review of the Second International Meeting.

    Science.gov (United States)

    Laplante-Lévesque, Ariane; Lunner, Thomas; Andersson, Gerhard; Preminger, Jill E

    2016-10-01

    This article describes the Second International Meeting on Internet and Audiology, which took place at the Eriksholm Research Centre, Oticon A/S, Denmark September 24 to 25, 2015, and introduces the research forum arising from the meeting. The potential gains of the Internet within audiology are framed within the central role of quality connections among people, ideas, and objects. First, the meeting is summarized. Second, the 11 articles arising from the meeting and collected in this research forum are grouped into 2 themes: design and evaluation. Last, the benefits of interoperability and standardization are discussed. We look forward to the day when the Internet is an integral part of audiology, and we invite readers to attend future editions of the International Meeting on Internet and Audiology.

  18. Annual review of research projects 1980

    International Nuclear Information System (INIS)

    Keam, D.W.

    1981-11-01

    The Australian Radiation Laboratory is a national centre concerned with the public and occupational health aspects of the use of both ionising and non-ionising radiation. Thirty two projects which were in progress during 1980 are described

  19. Environmental standards and project construction: A review

    International Nuclear Information System (INIS)

    Mason, P.F.; Thornberry, H.L.

    1991-01-01

    In the past decade, changes have occurred in the area of environmental regulation. This paper identifies the typical environmental standards applicable to project construction, recent environmental regulatory issues and trends, and identifies new environmental issues which must be considered in project construction. These include (1) handling hazardous chemicals in the workplace, (2) construction at formerly utilized sites, (3) disposal of debris, construction materials and hazardous waste, and (4) training and experience of construction personnel in environmental issues

  20. Proceedings of the fuel cells `94 contractors review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Carpenter, C.P. II; Mayfield, M.J. [eds.] [USDOE Morgantown Energy Technology Center, WV (United States)

    1994-08-01

    METC annually sponsors this conference to provide a forum for energy executives, engineers, etc. to discuss advances in fuel cell research and development projects, to exchange ideas with private sector attendees, and to review relevant results in fuel cell technology programs. Two hundred and three people from industry, academia, and Government attended. The conference attempts to showcase the partnerships with the Government and with industry, by seeking activity participation and involvement from the Office of Energy Efficiency and Renewable Energy, EPRI, GRI, and APRA. In addition to sessions on fuel cells (solid oxide, molten carbonate, etc.) for stationary electric power generation, sessions on US DOE`s Fuel Cell Transporation Program and on DOD/APRA`s fuel cell logistic fuel program were presented. In addition to the 29 technical papers, an abstract of an overview of international fuel cell development and commercialization plans in Europe and Japan is included. Selected papers were indexed separately for inclusion in the Energy Science and Technology Database.

  1. 77 FR 22332 - Center for Scientific Review; Notice of Meeting

    Science.gov (United States)

    2012-04-13

    ... meeting will be open to the public with attendance limited to space available. Individuals who plan to... Advisory Committee Policy. [FR Doc. 2012-8919 Filed 4-12-12; 8:45 am] BILLING CODE 4140-01-P ...

  2. 78 FR 19497 - Center for Scientific Review; Notice of Meeting

    Science.gov (United States)

    2013-04-01

    ... meeting will be open to the public, with attendance limited to space available. Individuals who plan to..., Program Analyst, Office of Federal Advisory Committee Policy. [FR Doc. 2013-07419 Filed 3-29-13; 8:45 am...

  3. 77 FR 59202 - Center for Scientific Review; Notice of Meeting

    Science.gov (United States)

    2012-09-26

    ... meeting will be open to the public, with attendance limited to space available. Individuals who plan to... Advisory Committee Policy. [FR Doc. 2012-23624 Filed 9-25-12; 8:45 am] BILLING CODE 4140-01-P ...

  4. Internet and Audiology: A Review of the First International Meeting.

    Science.gov (United States)

    Andersson, Gerhard; Lunner, Thomas; Laplante-Lévesque, Ariane; Preminger, Jill E

    2015-09-01

    The purpose of this research forum article is to describe the impetus for holding the First International Meeting on Internet and Audiology (October 2014) and to introduce the special research forum that arose from the meeting. The rationale for the First International Meeting on Internet and Audiology is described. This is followed by a short description of the research sections and articles appearing in the special issue. Six articles consider the process of health care delivery over the Internet; this includes health care specific to hearing, tinnitus, and balance. Four articles discuss the development of effective Internet-based treatment programs. Six articles describe and evaluate Internet-based interventions specific to adult hearing aid users. The fledgling field of Internet and audiology is remarkably broad. The Second International Meeting on Internet and Audiology ocurred in September 2015.

  5. Application of project design peer review to improve quality assurance

    International Nuclear Information System (INIS)

    McClure, F.E.

    1989-01-01

    DOE ORDER 5481.1B Safety Analysis and Review Systems and DOE ORDER 6430.1A General Design Criteria require that the design of facilities shall incorporate the necessary Quality Assurance review requirements to assure that the established program quality assurance objectives are met in the design criteria and the construction documents. The use of Project Design Peer Review to satisfy these requirements is presented. The University of California manages the Lawrence Berkeley Laboratory, the Lawrence Livermore National Laboratory, and the Los Alamos National Scientific Laboratory. The 1988 University Seismic Safety Policy requires the use of independent Project Design Peer Review in its capital improvement and seismic reconstruction program

  6. 76 FR 55384 - External Peer Review Meeting for the Draft Guidance of Applying Quantitative Data To Develop Data...

    Science.gov (United States)

    2011-09-07

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA/100/J-11/001; FRL-9460-1] External Peer Review Meeting for... attend this peer review meeting as observers. Time will be set aside for observers to give brief oral... the draft document, EPA intends to consider the comments from the external peer review meeting along...

  7. 76 FR 29746 - Science Advisory Board Staff Office Notification of a Public Meeting of the SAB Mercury Review Panel

    Science.gov (United States)

    2011-05-23

    ... Public Meeting of the SAB Mercury Review Panel AGENCY: Environmental Protection Agency (EPA). ACTION... Office announces a public meeting of the SAB Mercury Review Panel. DATES: The meeting will be held on... FACA and EPA policy, notice is hereby given that the SAB Mercury Review Panel will hold a public...

  8. 78 FR 52206 - Center For Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-08-22

    ...: Biophysics, Biochemistry and Chemistry. Date: September 18-19, 2013. Time: 8:00 a.m. to 3:00 p.m. Agenda: To..., Bethesda, MD 20892 (Virtual Meeting). Contact Person: John L Bowers, Ph.D., Scientific Review Officer..., Ph.D., Scientific Review Officer, Center for Scientific Review, National Institutes of Health, 6701...

  9. 77 FR 12605 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2012-03-01

    ..., (Virtual Meeting). Contact Person: Eduardo A Montalvo, Ph.D., Scientific Review Officer, Center for... Person: Allen Richon, Ph.D., Scientific Review Officer, Center for Scientific Review, National Institutes...: Chemistry, Biochemistry, Biophysics, and Bioengineering. Date: March 15-20, 2012. Time: 11 a.m. to 5 p.m...

  10. 78 FR 36789 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-06-19

    .... Contact Person: Aruna K Behera, Ph.D., Scientific Review Officer, Center for Scientific Review, National...: Biochemistry & Macromolecular Biophysics. Date: July 15-17, 2013. Time: 8:00 a.m. to 12:00 p.m. Agenda: To..., Bethesda, MD 20892 (Virtual Meeting). Contact Person: James W Mack, Ph.D., Scientific Review Officer...

  11. 77 FR 26790 - Meeting of the Public Safety Officer Medal of Valor Review Board

    Science.gov (United States)

    2012-05-07

    ... Safety Officer Medal of Valor Review Board AGENCY: Office of Justice Programs (OJP), Bureau of Justice... meeting (via conference call-in) of the Public Safety Officer Medal of Valor Review Board (``Board'') to... INFORMATION: The Public Safety Officer Medal of Valor Review Board carries out those advisory functions...

  12. 75 FR 4090 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2010-01-26

    ... El Camino Real, San Diego, CA 92130. Contact Person: William A. Greenberg, PhD., Scientific Review... (Virtual Meeting). Contact Person: Fouad A. El-Zaatari, PhD., Scientific Review Officer, Center for... for Scientific Review Special Emphasis Panel, Small Business: Experimental Cancer Therapeutics. Date...

  13. 75 FR 22819 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2010-04-30

    [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Center for Scientific Review Special... 20892, 301-435- 0903, [email protected]csr.nih.gov . Name of Committee: Center for Scientific Review Special...

  14. Annual review of research projects 1984

    International Nuclear Information System (INIS)

    Keam, D.W.

    1986-02-01

    This progress report provides a brief outline of current laboratory research and development projects and their present status. Research fields covered are: uranium, radon and its daughters, radiation effects in solids and gases, x-rays and clinical dosimetry, measurement standards in radiation dosimetry, radiopharmaceuticals and nuclear medicine, non-ionizing electromagnetic radiations, environmental radiochemistry and radiation monitoring

  15. Annual review of research projects 1983

    International Nuclear Information System (INIS)

    1985-08-01

    This progress report provides a brief outline of current laboratory research and development projects and their present status. Research fields covered are: uranium, radon and its daughters, radiation effects in solids and gases, thermoluminescence, x-rays and clinical dosimetry, measurement standards in radiation dosimetry, radiopharmaceuticals and nuclear medicine, radionuclide metrology, non-ionizing electromagnetic radiations, environmental radiochemistry and radiation monitoring

  16. Licensing Review in R+D Projects

    OpenAIRE

    Alessandro, Orsi

    2014-01-01

    FOSS packages are becoming ever more present in R&D projects carried out a variety of entities, including large corporations. I will focus on how legal risks associated with the use of FOSS licenses can be assessed and discuss measures directed to risk mitigation.

  17. 14. Annual meeting of the European Society of Radiobiology and the symposium of the European Late Effects Project Group

    International Nuclear Information System (INIS)

    Charles, M.W.

    1979-03-01

    In October 1978 the Fourteenth Annual Meeting of the European Society of Radiation Biology (ESRB) and a symposium of the European Late Effects Project Group (EULEP) were held consecutively at the Kernforchungsanlage (KFA), Julich, FDR. The EULEP meeting was convened to specifically discuss the biological basis of the recommendations of publication 26 of the International Commission on Radiological Protection (ICRP). The programme of the ESRB Meeting also reflected the present interest in radiological protection. A short summary of these meetings is presented. Details of the two meetings are given in appendices which should form an introduction to, and resume of, recent developments in this field. (author)

  18. 75 FR 54156 - Center for Scientific Review; Amended Notice of Meeting

    Science.gov (United States)

    2010-09-03

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Center for Scientific Review; Amended Notice of Meeting Notice is hereby given of a change in the meeting of the Language and Communication Study Section, October 4, 2010, 8 a.m. to October 5, 2010, 5 p.m., Ritz Carlton Hotel, 1150 22nd...

  19. Program and Abstracts: DOE Solar Program Review Meeting 2004, 25--28 October 2004, Denver, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    2004-10-01

    This booklet contains the agenda and abstracts for the 2004 U.S. DOE Solar Energy Technologies Program Review Meeting. The meeting was held in Denver, Colorado, October 25-28, 2004. More than 240 abstracts are contained in this publication. Topic areas for the research papers include laboratory research, program management, policy analysis, and deployment of solar technologies.

  20. 77 FR 27804 - Proposal Review Panel for Chemistry; Notice of Meeting

    Science.gov (United States)

    2012-05-11

    ... NATIONAL SCIENCE FOUNDATION Proposal Review Panel for Chemistry; Notice of Meeting In accordance with the Federal Advisory Committee Act (Pub. L. 92- 463, as amended), the National Science Foundation announces the following meeting: Name: Centers for Chemical Innovation (CCI) Solar Fuels: Powering the...

  1. 78 FR 65344 - Center for Scientific Review Amended Notice of Meeting

    Science.gov (United States)

    2013-10-31

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Center for Scientific Review Amended Notice of Meeting Notice is hereby given of a change in the meeting of the Molecular Neuropharmacology and Signaling Study Section, October 7, 2013, 8:00 a.m. to October 8, 2013, 12:00 p.m., The Dupont...

  2. 75 FR 2878 - Center for Scientific Review; Amended Notice of Meeting

    Science.gov (United States)

    2010-01-19

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Center for Scientific Review; Amended Notice of Meeting Notice is hereby given of a change in the meeting of the Molecular Neuropharmacology and Signaling Study Section, February 4, 2010, 8 a.m. to February 5, 2010, 5 p.m., Hotel Monaco...

  3. 78 FR 25101 - Proposal Review Panel for Physics, Notice of Meeting

    Science.gov (United States)

    2013-04-29

    ... NATIONAL SCIENCE FOUNDATION Proposal Review Panel for Physics, Notice of Meeting In accordance... Physics, 1208 Date and Time: Tuesday, April 30, 2013; 8:00 a.m.-6:00 p.m., Wednesday, May 1, 2013, 8:00 a... Meeting: Partially Closed. Contact Person: Mark Coles, Director of Large Facilities, Division of Physics...

  4. 75 FR 67142 - Proposal Review Panel for Physics; Notice of Meeting

    Science.gov (United States)

    2010-11-01

    ... NATIONAL SCIENCE FOUNDATION Proposal Review Panel for Physics; Notice of Meeting In accordance... announces the following meeting: Name: Site Visit to the Center for the Physics of Living Cells 1208. Dates... Physics of Living Cells (CPLC). Agenda Monday, November 8, 2010 9 a.m.-11:55 a.m.--Open--Directors...

  5. 75 FR 63865 - Proposal Review Panel for Physics; Notice of Meeting

    Science.gov (United States)

    2010-10-18

    ... NATIONAL SCIENCE FOUNDATION Proposal Review Panel for Physics; Notice of Meeting In accordance... announces the following meeting. Name: Michigan State University Site Visit in Physics (1208). Date and Time... Reidy, Program Director for Elementary Particle Physics, National Science Foundation, 4201 Wilson Blvd...

  6. 76 FR 65738 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2011-10-24

    ..., Bethesda, MD 20892, (301) 435-1166, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of..., [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the...

  7. 78 FR 19724 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-04-02

    ... 20892, (301) 594-1245, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing...

  8. 75 FR 56554 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2010-09-16

    ... Health, 6701 Rockledge Drive, Room 4122, MSC 7802, Bethesda, MD 20892, 301-435-1212, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations... meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Center...

  9. 77 FR 65568 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2012-10-29

    ..., (301) 435- 2398, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Center..., [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the...

  10. 76 FR 11500 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2011-03-02

    ... 20892, (301) 435-1045, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing...

  11. 77 FR 73474 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2012-12-10

    ... 20892, (301) 806-3323, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee..., [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the...

  12. 76 FR 4924 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2011-01-27

    ..., (301) 435- 2344, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing...

  13. 77 FR 48526 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2012-08-14

    ..., Bethesda, MD 20892, 301-435- 1050, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing...

  14. 78 FR 78984 - Center For Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-12-27

    ... 7852, Bethesda, MD 20892, 301-435- 1050, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing...

  15. 75 FR 70272 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2010-11-17

    ... 7759, Bethesda, MD 20892, 301-435- 2889, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle..., [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the...

  16. 78 FR 67375 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-11-12

    ..., Room 6214, MSC 7804, Bethesda, MD 20892, (301) 435-5877, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and...-435- 1050, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting...

  17. 77 FR 73475 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2012-12-10

    ..., Bethesda, MD 20892, 301-402-4454, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of..., [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the...

  18. 76 FR 8751 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2011-02-15

    ..., Bethesda, MD 20892, 301-435- 0903, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of...-1215, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due...

  19. 76 FR 2107 - Human Studies Review Board; Notice of Public Meeting

    Science.gov (United States)

    2011-01-12

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-ORD-2011-0970; FRL-9252-3] Human Studies Review Board; Notice of Public Meeting AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: The U.S. Environmental Protection Agency (EPA or Agency) Office of the Science Advisor (OSA) announces a public meeting...

  20. 75 FR 32461 - Human Studies Review Board; Notice of Public Meeting

    Science.gov (United States)

    2010-06-08

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-ORD-2010-0381; FRL-9159-9] Human Studies Review Board; Notice of Public Meeting AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: The U.S. Environmental Protection Agency's (EPA or Agency) Office of the Science Advisor (OSA) announces a public meeting...

  1. 75 FR 61748 - Human Studies Review Board; Notice of Public Meeting

    Science.gov (United States)

    2010-10-06

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-ORD-2010-0797' FRL-9211-1] Human Studies Review Board; Notice of Public Meeting AGENCY: Environmental Protection Agency (EPA). ACTION: Notice. SUMMARY: The U.S. Environmental Protection Agency (EPA or Agency) Office of the Science Advisor (OSA) announces a public meeting...

  2. 75 FR 3493 - Proposal Review Panel for Physics; Notice of Meeting

    Science.gov (United States)

    2010-01-21

    ... NATIONAL SCIENCE FOUNDATION Proposal Review Panel for Physics; Notice of Meeting In accordance... announces the following meeting. Name: University of Nebraska Site Visit in Physics (1208). Date and Time... Director for Elementary Particle Physics, National Science Foundation, 4201 Wilson Blvd., Arlington, VA...

  3. 75 FR 57298 - Proposal Review Panel for Physics; Notice of Meeting

    Science.gov (United States)

    2010-09-20

    ... NATIONAL SCIENCE FOUNDATION Proposal Review Panel for Physics; Notice of Meeting In accordance... announces the following meeting. Name: University of Notre Dame Site Visit in Physics (1208). Date and Time..., Program Director for Physics Education and Disciplinary Research, National Science Foundation, 4201 Wilson...

  4. 77 FR 45366 - Center for Scientific Review; Notice of Closed Meeting

    Science.gov (United States)

    2012-07-31

    ....S.C. App.), notice is hereby given of the following meeting. The meeting will be closed to the public in accordance with the provisions set forth in sections 552b(c)(4) and 552b(c)(6), Title 5 U.S.C..., Bethesda, MD 20892, (Telephone Conference Call). Contact Person: Yi-Hsin Liu, Ph.D., Scientific Review...

  5. A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-06-01

    Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region.

  6. A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region

  7. Meeting review: 2002 O'Reilly Bioinformatics Technology Conference.

    Science.gov (United States)

    Counsell, Damian

    2002-01-01

    At the end of January I travelled to the States to speak at and attend the first O'Reilly Bioinformatics Technology Conference. It was a large, well-organized and diverse meeting with an interesting history. Although the meeting was not a typical academic conference, its style will, I am sure, become more typical of meetings in both biological and computational sciences.Speakers at the event included prominent bioinformatics researchers such as Ewan Birney, Terry Gaasterland and Lincoln Stein; authors and leaders in the open source programming community like Damian Conway and Nat Torkington; and representatives from several publishing companies including the Nature Publishing Group, Current Science Group and the President of O'Reilly himself, Tim O'Reilly. There were presentations, tutorials, debates, quizzes and even a 'jam session' for musical bioinformaticists.

  8. 75 FR 31798 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2010-06-04

    ... Beach and Executive Meeting Center, 701 West Ocean Boulevard, Long Beach, CA 90831. Contact Person...: Center for Scientific Review Special Emphasis Panel, ARRA: Risk Prevention and Health Behavior Across the...

  9. 76 FR 42167 - Rehabilitation Research and Development Service Scientific Merit Review Board; Notice of Meeting

    Science.gov (United States)

    2011-07-18

    ... subcommittees of the Board will meet to evaluate merit review applications: August 9--Rehabilitation Engineering... Rehabilitation. August 16--Rehabilitation Engineering and Prosthetics/Orthotics. August 16-17--Psychological... DEPARTMENT OF VETERANS AFFAIRS Rehabilitation Research and Development Service Scientific Merit...

  10. Second public meeting of Governor Kaine's Independent Virginia Tech Incident Review Panel

    OpenAIRE

    Owczarski, Mark

    2007-01-01

    The second public meeting of Governor Kaine's Independent Virginia Tech Incident Review Panel will convene on Monday, May 21, at The Inn at Virginia Tech and Skelton Conference Center Latham Ballroom, 901 Prices Fork Road in Blacksburg.

  11. 78 FR 55266 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-09-10

    ... the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee... evaluate grant applications. Place: Torrance Marriott South Bay, 3635 Fashion Way, Torrance, CA 90503...

  12. Conference report. Fourth review meeting of the parties of the Joint Convention

    International Nuclear Information System (INIS)

    Brennecke, Peter

    2012-01-01

    The Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management, the first legal instrument to directly address these topics on a global scale, was opened for signature 29 September 1997. It entered into force 18 June 2001. The Convention calls for triannual review meetings of the Contracting Parties. Each Contracting Party is required to submit a national report to each review meeting that addresses measures taken to implement each of the obligations of the Convention. The first review meeting took place in 2003. The 4 th review meeting of this Convention took place from 14 to 23 May 2012 at the International Atomic Energy Agency (IAEA) Headquarter in Vienna/Austria. (orig.)

  13. LBNL report of the vetting review of the GRETINA project

    International Nuclear Information System (INIS)

    Robinson, K.E.; Bercovitz, J.H.; Bieser, F.S.; Jared, R.C.; Karpenko, V.P.; Klein, S.R.; Lesko, K.T.; Rasson, J.E.; Ritter, H.G.; Tull, C.E.; Wells, R.; Wieman, H.H.

    2004-01-01

    GRETINA is a gamma-ray detector array capable of reconstructing the energy and spatial positions of gamma-ray interactions within the germanium crystals. It will be used to study the structure and stability of nuclei under various conditions. The new capabilities provided by gamma-ray tracking will give large gains in sensitivity for a large number of experiments, particularly those aimed at nuclei far from beta stability. A proposal for GRETINA was submitted to DOE in June 2003. It presented the scientific case, the readiness of technical development, the design, the suggested management organizations, and a proposed cost and schedule. The GRETINA proposal received its CD0 approval in August 2003. The CD-1 review will be held on December 3 and 4, 2003, and will be handled by the DOE-N. This report presents the charge to the GRETINA vetting review committee, and the findings, comments and recommendations of this committee. The purpose of this project vetting review was to assure that the GRETINA project is on track to provide DOE and the nuclear physics community with the agreed upon deliverables within the agreed upon budget and schedule. The vetting review committee was asked to cover both technical and management aspects of the GRETINA Project. Reviewers offer expert knowledge in relevant areas and provide recommendations and findings to the project's management team. Upon successful completion, the Laboratory's Integrated Project Management Office (IPMO) will recommend signoff of the project to the Laboratory Directorate. The GRETINA vetting review committee was asked to consider all relevant aspects of the project's management, project execution plan (PEP), technical approach and status, cost estimate, resources, schedule and risk and, in doing so, to advise as to whether the GRETINA Project was likely to successfully provide the agreed upon deliverables within the agreed upon budget and schedule. The review committee was asked to identify any project areas

  14. Fifth review meeting of the contracting parties of the joint convention

    International Nuclear Information System (INIS)

    Brennecke, Peter

    2015-01-01

    The 5 th Review Meeting of the ''Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management'' was held at International Atomic Energy Agency (IAEA) Headquarters in Vienna on 11 to 22 May 2015. Sixty-one of sixty-nine Contracting Parties with more than 700 delegates and the OECD/NEA as an observer attended the meeting. Within this regularly scheduled meeting every three years it is checked in which way the contracting parties meet the objectives of the Joint Convention, i.e., the respective national radioactive waste management policy and its implementation is critically reviewed, the respective reached safety level discussed and - where necessary - improvements suggested. As a result the Contracting Parties in particular concur that the 5 th Review Meeting encouraged constructive exchanges and sharing of knowledge. Some highlights of good progress and significant accomplishments since the 4 th Review Meeting include, e.g., the implementation of national policies, strategies and programs for spent fuel and radioactive waste management or the construction and commissioning of storage facilities and repositories for spent fuel and radioactive waste. The 6 th Review Meeting of the Contracting Parties to the Joint Convention will be held at IAEA Headquarters in Vienna on 21 May to 1 June 2018.

  15. Report of the second review meeting on management of water hyacinth

    International Nuclear Information System (INIS)

    1981-11-01

    The present meeting is intended to review a very important project in our Asia/Pacific Rural Technology Programme. The project was conceived in 1978, and had its first review in 1979; it will run for three years and finish next year. It involves India, Bangladesh, Australia, Sri lanka, Malaysia and Fiji with India providing the Regional Coordination. In the wake of the growing recognition by the Commonwealth Government of the pressing need for increased efforts for rural development, the CSC initiated its Asia/Pacific Rural Technology Programme in 1978. The major objectives were to develop increased awareness of the scientific community to the problems of declining quality of rural life and to encourage them to undertake new and sustained efforts to promote technologies which are suitable for establishing rural industries. In essence, the aim was to contribute, however modestly, to rural employment and a better quality of rural life. It has now been over 3 years since the programme was conceived. The programme has made very good progress and I would like to illustrate this by giving some examples. At present the programme comprises of 10 projects. These are: generation of technology packages for agro-based industries, organising the traditional light engineering industry, economic utilization of paddy by-products improvement of rural housing and environment, cultivation and processing of medicinal plants, small package water treatment plant, management of water hyacinth, study of rural energy needs and resource potential, integrated biogas systems, local manufacture of small prime movers. Out of these, four are coordinated by India, three by Sri Lanka, and one each by Bangladesh, Malaysia and Seychelles

  16. 75 FR 51082 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2010-08-18

    ... U.S.C. App.), notice is hereby given of the following meetings. The meetings will be closed to the public in accordance with the provisions set forth in sections 552b(c)(4) and 552b(c)(6), Title 5 U.S.C... Conference Call). Contact Person: Yi-Hsin Liu, PhD, Scientific Review Officer, Center for Scientific Review...

  17. Review of Ruegen herring larvae survey project 2011

    NARCIS (Netherlands)

    Dickey-Collas, M.; Nash, R.D.M.

    2011-01-01

    At the request of the Johann Heinrich von Thünen Institut (vTI), IOR Rostock, a return review of the German Rügen herring larval survey (RHLS) project took place on the 24th to 26th January 2011, following on from a similar review in November 2006. Mark Dickey-Collas (Wageningen IMARES) and Richard

  18. 76 FR 47089 - Regulatory Review Schedule; Cancellation of Consultation Meetings

    Science.gov (United States)

    2011-08-04

    ... Consultation-- Wild Horse Resort Casino, 1, 2, 3, 4, 5 Southwest. Scottsdale, AZ. September 19-20, 2011 NIGC Regional Training..... Sky Ute Casino Resort 3, 4, 5 Ignacio, CO. September 27-28, 2011 NIGC Consultation-- Turning Stone Casino, NY... 3, 5 Northeast. November 7-12, 2011 USET Annual Meeting........ Mississippi...

  19. Meeting

    Indian Academy of Sciences (India)

    July 1989 No.19 Newsletter of the Indian Academy of Sciences. 55th Annual. Meeting ... in the world, keeping alive atthe same time his research interests, abreast .... theory made a comeback with many new ideas and with the success of the ...

  20. Annual review of research projects 1985

    International Nuclear Information System (INIS)

    Keam, D.W.

    1987-04-01

    This progress report provides a brief outline of current Laboratory research and development projects and their present status. The material has been grouped into the following fields: uranium, radon and its daughters; radiation effects in solids and gases; x-rays and clinical dosimetry, measurement standards in radiation dosimetry; radiopharmaceuticals and nuclear medicine; non-ionising electromagnetic radiation; environmental radiochemistry and radiation monitoring. The last category includes residual radioactive contamination at Maralinga, Emu and the Monte Bello Islands from British nuclear weapons tests in Australia, and the public health impact of fall-out from those tests

  1. Proceedings of the public meeting to address a proposed federal radiation research agenda. Volume 2. Science projection papers

    International Nuclear Information System (INIS)

    1980-03-01

    Separate abstracts were prepared for the 14 science projection papers presented at a public meeting on March 10-11, 1980 to address a proposed federal radiation research agenda into the biological effects of ionizing radiation

  2. RPERT: Repetitive-Projects Evaluation and Review Technique

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2014-03-01

    Full Text Available Estimating expected completion probability of any repetitive construction project with a specified/certain duration including repetitive identical activities by using program evaluation and review technique is the most essential part in construction areas since the activities were had optimistic, most likely and pessimistic durations. This paper focuses on the calculation of expected completion probability of any repetitive construction project within a specified/certain duration (contract duration by using Line Of Balance technique (LOB in case of single or multiple number of crews integrated with Program Evaluation and Review Technique (PERT. Repetitive-Projects Evaluation and Review Technique (RPERT, which is a simplified software, will generate the expected project completion probability of a specified/certain duration (contract duration. RPERT software is designed by java programming code system to provide a number of new and unique capabilities, including: (1 Viewing the expected project completion probability according to a set of specified durations per each identical activity (optimistic time, most likely time, and pessimistic time in the analyzed project; (2 Providing seamless integration with available project time calculations. In order to provide the aforementioned capabilities of RPERT, the system is implemented and developed in four main modules: (1 A user interface module; (2 A database module; (3 A running module; and (4 A processing module. At the end, an illustrative example will be presented to demonstrate and verify the applications of proposed software (RPERT, by using probabilistic calculations for repetitive construction projects.

  3. Contractor firm strategies in delivering green project: A review

    Science.gov (United States)

    Powmya, Ayisha; Abidin, Nazirah Zainul; Azizi, Nurul Sakina Mokhtar

    2017-10-01

    Building green requires effort from various parties, from those who plan, design, manage and construct the building. Contractors are responsible for converting the design on paper into a real building and their role at the construction site support environmental sustainability by implementing responsible construction practices. Inefficient or inexperienced contractor in green construction project may find that delivering this type of project is not an easy task due to added requirement in design, stringent practices at site and the use of green technology and materials. Adopting suitable strategies at firm level will assist in preparatory process and readiness of delivering the green project. This paper reviews the strategies at firm level to deliver green construction project. From extensive literature review, it was discovered that there are six strategies to be adopted by the contractor. Understanding these strategies is expected to promote more contractors to be proactive in delivering green projects.

  4. A review of the possible future HEP Accelerator Projects

    CERN Multimedia

    CERN. Geneva

    2010-01-01

    The review, as already invited for presentation at the recent International Conference on High Energy Physics (ICHEP2010), covers all accelerator projects presently envisaged for HEP in the near and mid-term future. After a brief description of the major motivation, issues and necessary R&D of each project, it specially emphasizes the synergies between the different projects and their R&D issues, pointing out their complementarities and the efficient collaborative approach to address them. It finally summarizes the relative schedule of the various projects in their different phases, pointing out their global interdependence.

  5. Annual review of research projects 1987

    International Nuclear Information System (INIS)

    Keam, D.W.

    1989-04-01

    The Australian Radiation Laboratory is a national laboratory whose function is to assist the users of radiation, and those who regulate its use, to ensure that wherever radiation is encountered, it is managed in the safest possible way. In performing this function the Laboratory conducts a varied program of applied research in areas which have implications for occupational or public health. This progress report provides a brief outline of current Laboratory research and development projects and their present status. The material is grouped into the following research fields: uranium, radon and its daughters; environmental radiation monitoring; radiopharmaceuticals and nuclear medicine; X-ray and clinical dosimetry; radionuclide metrology; non-ionising electromagnetic radiations; measurement standards in radiation dosimetry; and radiation effects in solids and gases. Refs., figs., tabs

  6. Fifth Single-Shell Tank Integrity Project Expert Panel Meeting August 28-29, 2014

    Energy Technology Data Exchange (ETDEWEB)

    Martin, Todd M. [Washington River Protection Solutions, LLC, Richland, WA (United States; Gunter, Jason R. [Washington River Protection Solutions, LLC, Richland, WA (United States); Boomer, Kayle D. [Washington River Protection Solutions, LLC, Richland, WA (United States)

    2015-01-07

    On August 28th and 29th, 2014 the Single-Shell Tank Integrity Project (SSTIP) Expert Panel (Panel) convened in Richland, Washington. This was the Panel’s first meeting since 2011 and, as a result, was focused primarily on updating the Panel on progress in response to the past recommendations (Single-Shell Tank Integrity Expert Panel Report, RPP-RPT-45921, Rev 0, May 2010). This letter documents the Panel’s discussions and feedback on Phase I activities and results.

  7. Review of the twelfth West Coast retrovirus meeting

    Directory of Open Access Journals (Sweden)

    Melar Marta

    2005-11-01

    Full Text Available Abstract Every year the Cancer Research Institute from University of California at Irvine organizes the West Coast Retrovirus Meeting where participants have a chance to discuss the latest progress in understanding the pathology of retroviruses. The 12th meeting was held at the Hyatt Regency Suites in Palm Springs, California from October 6th to October 9th 2005, with the major focus on human immunodeficiency virus (HIV pathogenesis. Philippe Gallay from The Scripps Research Institute and Thomas J. Hope from Northwestern University organized the meeting, which covered all the steps involved in the lifecycle of retroviruses with an emphasis on virus:host interactions. The trend in research appeared to be on the restriction of viral infection, both by the endogenous, cellular restriction factors, as well as by the potential antimicrobial compounds of known or unknown mechanisms. Additionally, new stories on the inevitable feedback from the host immune system were presented as well. HIV still represents a challenge that an army of motivated people has been working on for over 20 years. And yet, the field has not reached the plateau in knowledge nor enthusiasm, which was proven again in October 2005 in Palm Springs.

  8. 75 FR 57779 - Science Advisory Board Staff Office; Notification of a Public Meeting of the SAB Dioxin Review Panel

    Science.gov (United States)

    2010-09-22

    ... a Public Meeting of the SAB Dioxin Review Panel AGENCY: Environmental Protection Agency (EPA...) Staff Office announces a public meeting of the SAB Dioxin Review Panel to continue its review of EPA's Reanalysis of Key Issues Related to Dioxin Toxicity and Response to NAS Comments, External Review Draft...

  9. Projective geometry solved problems and theory review

    CERN Document Server

    Fortuna, Elisabetta; Pardini, Rita

    2016-01-01

    This book starts with a concise but rigorous overview of the basic notions of projective geometry, using straightforward and modern language. The goal is not only to establish the notation and terminology used, but also to offer the reader a quick survey of the subject matter. In the second part, the book presents more than 200 solved problems, for many of which several alternative solutions are provided. The level of difficulty of the exercises varies considerably: they range from computations to harder problems of a more theoretical nature, up to some actual complements of the theory. The structure of the text allows the reader to use the solutions of the exercises both to master the basic notions and techniques and to further their knowledge of the subject, thus learning some classical results not covered in the first part of the book. The book addresses the needs of undergraduate and graduate students in the theoretical and applied sciences, and will especially benefit those readers with a solid grasp of ...

  10. 77 FR 5471 - Announcement of Public Meeting on the Consumer Confidence Report (CCR) Rule Retrospective Review

    Science.gov (United States)

    2012-02-03

    ... Announcement of Public Meeting on the Consumer Confidence Report (CCR) Rule Retrospective Review AGENCY... stakeholder input on the Consumer Confidence Report (CCR) Rule as part of the agency's Retrospective Review of... Safe Drinking Water Act (SDWA, section 1414(c)). The Consumer Confidence Report, or CCR, is an annual...

  11. 76 FR 44942 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2011-07-27

    ...: Sensation and Perception. Date: August 17-18, 2011. Time: 8 a.m. to 5 p.m. Agenda: To review and evaluate... (Virtual Meeting). Contact Person: John Bishop, PhD, Scientific Review Officer, Center for Scientific..., MD 20892 (Telephone Conference Call) Contact Person: Samuel C. Edwards, PhD, Chief, Center for...

  12. 76 FR 60933 - Proposal Review Panel for Human Resource Development; Notice of Meeting

    Science.gov (United States)

    2011-09-30

    ... NATIONAL SCIENCE FOUNDATION Proposal Review Panel for Human Resource Development; Notice of..., Proposal Review Panel Human Resource Development ( 1199). Date/Time: October 17, 2011; 5 p.m. to 10 p.m... Meeting: Part-Open. Contact Person: Kelly Mack, Division of Human Resource Development, Room 815, National...

  13. 77 FR 18268 - Proposal Review Panel for Engineering Education and Centers; Notice of Meeting

    Science.gov (United States)

    2012-03-27

    ... NATIONAL SCIENCE FOUNDATION Proposal Review Panel for Engineering Education and Centers; Notice of... Science Foundation announces the following meeting: Name: Proposal Review Panel for Engineering Education...--ERC Research Program 3:30 p.m.--7:30 p.m. Closed--ERC Education Program Thursday, March 29, 2012 8 a.m...

  14. Ethical review from the inside: repertoires of evaluation in Research Ethics Committee meetings

    NARCIS (Netherlands)

    de Jong, Jean Philippe; van Zwieten, Myra C. B.; Willems, Dick L.

    2012-01-01

    Evaluating the practice of ethical review by Research Ethics Committees (REC) could help protect the interests of human participants and promote scientific progress. To facilitate such evaluations, we conducted an ethnographic study of how an REC reviews research proposals during its meetings. We

  15. 78 FR 6854 - Health Services Research and Development Service Scientific Merit Review Board; Notice of Meeting

    Science.gov (United States)

    2013-01-31

    ... DEPARTMENT OF VETERANS AFFAIRS Health Services Research and Development Service Scientific Merit... Research and Development Service Scientific Merit Review Board will meet on February 13-14, 2013, at the... research. Applications are reviewed for scientific and technical merit. Recommendations regarding funding...

  16. 77 FR 24228 - Proposal Review Panel for Social and Economic Sciences; Notice of Meeting

    Science.gov (United States)

    2012-04-23

    ... NATIONAL SCIENCE FOUNDATION Proposal Review Panel for Social and Economic Sciences; Notice of...; Division of Social and Economic Sciences, Room 990, National Science Foundation, 4201 Wilson Boulevard... Science Foundation announces the following meeting: Name: Site visit review of the Nanoscale Science and...

  17. 76 FR 17625 - Fisheries of the South Atlantic; Southeast Data, Assessment, and Review; Public Meeting

    Science.gov (United States)

    2011-03-30

    ...: Participants will present summary data, and discuss data needs and treatments. Special Accommodations The... the South Atlantic; Southeast Data, Assessment, and Review; Public Meeting AGENCY: National Marine... of Southeast Data and Review (SEDAR) 26 data webinar for Caribbean Silk snapper, Queen snapper, and...

  18. 76 FR 72208 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2011-11-22

    ... 20892, (301) 402-4411, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of [email protected]csr.nih.gov . Name of Committee: Center for Scientific Review Special Emphasis Panel, Studies in...

  19. 75 FR 9911 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2010-03-04

    ... 20892. 301-435-1169. [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee...-408-9164. [email protected]csr.nih.gov . Name of Committee: Center for Scientific Review Special Emphasis...

  20. 77 FR 62246 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2012-10-12

    [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Center for Scientific Review Special..., 6701 Rockledge Drive, Room 5208, MSC 7852, Bethesda, MD 20892, (301) 435-1165, [email protected]csr.nih.gov...

  1. 76 FR 63315 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2011-10-12

    [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Center for Scientific Review Special... Rockledge Drive, Room 5110, MSC 7854, Bethesda, MD 20892, (301) 435-1174, [email protected]csr.nih.gov . Name of...

  2. 75 FR 11895 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2010-03-12

    .... (301) 435- 1258. [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: [email protected]csr.nih.gov . Name of Committee: Center for Scientific Review Special Emphasis Panel, Member Conflict...

  3. 75 FR 56115 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2010-09-15

    ... days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name.... (301) 435- 1046. [email protected]csr.nih.gov . Name of Committee: Center for Scientific Review Special Emphasis..., Bethesda, MD 20892. 301-435- 1052. [email protected]csr.nih.gov . Name of Committee: Biobehavioral and Behavioral...

  4. 75 FR 8370 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2010-02-24

    [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Center for Scientific Review Special..., Bethesda, MD 20892. 301-435-1159. [email protected]csr.nih.gov . This notice is being published less than 15...

  5. 77 FR 14533 - Center for Scientific Review: Notice of Closed Meetings

    Science.gov (United States)

    2012-03-12

    ..., Bethesda, MD 20892, 301-408- 9971, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of...-435-1236, [email protected]csr.nih.gov . Name of Committee: Center for Scientific Review Special Emphasis...

  6. 78 FR 61376 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-10-03

    ...-1215, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Center for...-435-1137, [email protected]csr.nih.gov . Name of Committee: Center for Scientific Review Special Emphasis...

  7. 76 FR 12980 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2011-03-09

    [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Center for Scientific Review Special..., Bethesda, MD 20892, 301-435-1022, [email protected]csr.nih.gov . Name of Committee: Center for Scientific...

  8. 76 FR 13421 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2011-03-11

    ..., Room 3136, MSC 7759, Bethesda, MD 20892. (301) 435-1258. [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and.... [email protected]csr.nih.gov . Name of Committee: Center for Scientific Review Special Emphasis Panel, Cancer...

  9. 77 FR 27468 - Center for Scientific Review, Notice of Closed Meetings

    Science.gov (United States)

    2012-05-10

    ..., (Virtual Meeting). Contact Person: Edwin C Clayton, Ph.D., Scientific Review Officer, Center for Scientific...-408-9041, [email protected] . Name of Committee: Biological Chemistry and Macromolecular Biophysics Integrated Review Group; Synthetic and Biological Chemistry B Study Section. Date: May 30-31, 2012. Time: 8...

  10. 78 FR 26644 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-05-07

    ...: Digestive, Kidney and Urological Systems Integrated Review Group; Xenobiotic and Nutrient Disposition and... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Center for Scientific Review; Notice of Closed Meetings Pursuant to section 10(d) of the Federal Advisory Committee Act, as amended (5...

  11. 78 FR 6125 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-01-29

    ..., [email protected] . Name of Committee: Digestive, Kidney and Urological Systems Integrated Review Group... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Center for Scientific Review; Notice of Closed Meetings Pursuant to section 10(d) of the Federal Advisory Committee Act, as amended (5...

  12. 77 FR 2738 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2012-01-19

    ... Committee: Digestive, Kidney and Urological Systems Integrated Review Group; Hepatobiliary Pathophysiology... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Center for Scientific Review; Notice of Closed Meetings Pursuant to section 10(d) of the Federal Advisory Committee Act, as amended (5...

  13. 78 FR 28599 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-05-15

    ... Committee: Digestive, Kidney and Urological Systems Integrated Review Group, Kidney Molecular Biology and... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Center for Scientific Review; Notice of Closed Meetings Pursuant to section 10(d) of the Federal Advisory Committee Act, as amended (5...

  14. 75 FR 54156 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2010-09-03

    ... Committee: Digestive, Kidney and Urological Systems Integrated Review Group, Gastrointestinal Mucosal... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Center for Scientific Review; Notice of Closed Meetings Pursuant to section 10(d) of the Federal Advisory Committee Act, as amended (5...

  15. 78 FR 54258 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-09-03

    ... Committee: Digestive, Kidney and Urological Systems Integrated Review Group; Clinical, Integrative and... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Center for Scientific Review; Notice of Closed Meetings Pursuant to section 10(d) of the Federal Advisory Committee Act, as amended (5...

  16. 77 FR 511 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2012-01-05

    ...: Digestive, Kidney and Urological Systems Integrated Review Group, Clinical, Integrative and Molecular... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Center for Scientific Review; Notice of Closed Meetings Pursuant to section 10(d) of the Federal Advisory Committee Act, as amended (5...

  17. 77 FR 1699 - Center for Scientific Review: Notice of Closed Meetings

    Science.gov (United States)

    2012-01-11

    ... Committee: Digestive, Kidney and Urological Systems Integrated Review Group; Gastrointestinal Mucosal... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Center for Scientific Review: Notice of Closed Meetings Pursuant to section 10(d) of the Federal Advisory Committee Act, as amended (5...

  18. 76 FR 30372 - Center for Scientific Review; Meetings

    Science.gov (United States)

    2011-05-25

    ... Panel; Member Conflict: Speech and Cognition. Date: June 9-10, 2011. Time: 11 a.m. to 5 p.m. Agenda: To....gov . Name of Committee: Center for Scientific Review Special Emphasis Panel; Member Conflict: Emotion...

  19. Congressional hearing reviews NSF major research and facilities projects

    Science.gov (United States)

    Showstack, Randy

    2012-03-01

    An 8 March congressional hearing about the U.S. National Science Foundation's Major Research Equipment and Facilities Construction (NSF MREFC) account focused on fiscal management and accountability of projects in that account and reviewed concerns raised by NSF's Office of Inspector General (OIG). NSF established the MREFC account in 1995 to better plan and manage investments in major equipment and facilities projects, which can cost from tens of millions to hundreds of millions of dollars, and the foundation has funded 17 MREFC projects since then. The Obama administration's proposed fiscal year (FY) 2013 budget includes funding for four MREFC projects: Advanced Laser Gravitational-Wave Observatory (AdvLIGO), Advanced Technology Solar Telescope (ATST), National Ecological Observatory (NEON), and Ocean Observatories Initiative (OOI). The hearing, held by a subcommittee of the House of Representatives' Committee on Science, Space, and Technology, reviewed management oversight throughout the life cycles of MREFC projects and concerns raised in recent OIG reports about the use of budget contingency funds. NSF's February 2012 manual called "Risk management guide for large facilities" states that cost contingency is "that portion of the project budget required to cover `known unknowns,'" such as planning and estimating errors and omissions, minor labor or material price fluctuations, and design developments and changes within the project scope. Committee members acknowledged measures that NSF has made to improve the MREFC oversight process, but they also urged the agency to continue to take steps to ensure better project management.

  20. A desk evaluation review of project RAF/4/004 nuclear instruments maintenance. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-04-15

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the outputs of a project. This project was originally intended for six selected countries in Africa, namely, Algeria, Egypt, Ghana, Libya, Zaire and Zambia. Ethiopia and Tanzania joined in 1993 and it has now been extended to two other countries, Madagascar and Sudan. This is a step forward towards developing the infrastructure for nuclear instrumentation and maintenance is as many countries in Africa as require this service. A project summary along with financial data and recommendations for improvements are given. A table where total assistance provided to ten selected african countries is included.

  1. A desk evaluation review of project RAF/4/004 nuclear instruments maintenance. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the outputs of a project. This project was originally intended for six selected countries in Africa, namely, Algeria, Egypt, Ghana, Libya, Zaire and Zambia. Ethiopia and Tanzania joined in 1993 and it has now been extended to two other countries, Madagascar and Sudan. This is a step forward towards developing the infrastructure for nuclear instrumentation and maintenance is as many countries in Africa as require this service. A project summary along with financial data and recommendations for improvements are given. A table where total assistance provided to ten selected african countries is included

  2. African refugee and immigrant health needs: report from a community-based house meeting project.

    Science.gov (United States)

    Boise, Linda; Tuepker, Anais; Gipson, Teresa; Vigmenon, Yves; Soule, Isabelle; Onadeko, Sade

    2013-01-01

    As in other communities in the United States, information is lacking about the health needs of Africans refugees and immigrants living in Portland, Oregon. In 2008, the African Partnership for Health coalition (APH) was formed to carry out research, advocacy and education to improve the health and well-being of Africans in Oregon. This was APH's initial project. The purposes of this study were to gather data about the perceived health needs and barriers to health care Africans encounter, and lay the foundation for a program of action to guide APH's future work. Community-based participatory research (CBPR) methods were used to collect data on how to improve the health of the African community in the Portland area and define an agenda for future projects. Popular education principles guided the engagement and training of African community members, who conducted nine house meetings with 56 Africans from 14 countries. The results were analyzed by African community members and researchers and prioritized at a community meeting. Three themes emerged: The stressfulness of life in America, the challenges of gaining access to health care, and the pervasive feelings of disrespect and lack of understanding of Africans' health needs, culture, and life experiences by health providers and staff members. Using CBPR methods, we identified and prioritized the needs of the African community. This information provides a framework for future work of the African Partnership for Health and other service and advocacy groups.

  3. Review of the 2008 UNFCCC meeting in Poznan

    International Nuclear Information System (INIS)

    Lovett, Jon C.; Hofman, Peter S.; Morsink, Karlijn; Clancy, Joy S.; Torres, Arturo Balderas; Krabbendam, Koos

    2009-01-01

    Technology transfer is a central component in policies and action to prevent dangerous anthropogenic interference with the climate system. Without creation and adoption of suitable environmentally sound technologies it will not be possible to follow the basic principles of sustainable development. Technology transfer was expected to be a major item at the United Nations Climate Change Conference in Poznan, Poland, 1-12 December 2008, but was eclipsed by discussions on Reducing Emissions from Deforestation in Developing Countries. However, agreement was reached on a report from the Global Environment Facility called the 'Poznan strategic programme on technology transfer' outlining proposals to scale-up investment. At the meeting it was not possible to reach agreement on inclusion of carbon capture and storage technology under the clean development mechanism and other areas of unresolved discussion included intellectual property rights and revision of the principle of differentiated responsibility. Side-events to the main meeting provided two important indications of future directions. First, intellectual property rights were discussed at length primarily with the opinion that they were not a major barrier to technology transfer. Second, representatives from the business sector were regarding environmentally sound technologies as an opportunity for economic growth and development. (author)

  4. Proceedings of the third annual fuel cells contractors review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Huber, W.J. (ed.)

    1991-06-01

    The overall objective of this program is to develop the essential technology for private sector characterization of the various fuel cell electrical generation systems. These systems promise high fuel to electricity efficiencies (40 to 60 percent), distinct possibilities for cogeneration applications, modularity of design, possibilities of urban siting, and environmentally benign emissions. The purpose of this meeting was to provide the research and development (R D) participants in the DOE/Fossil Energy-sponsored Fuel Cells Program with the opportunity to present key results of their research and to establish closer business contacts. Major emphasis was on phosphoric acid, molten carbonate, and solid oxide technology efforts. Research results of the coal gasification and gas stream cleanup R D activities pertinent to the Fuel Cells Program were also highlighted. Two hundred seventeen attendees from industry, utilities, academia, and Government participated in this 2-day meeting. Twenty-three papers were given in three formal sessions: molten carbonate fuel cells R D (9 papers), solid oxide fuel cells (8 papers), phosphoric acid fuel cells R D (6 papers). In addition to the papers and presentations, these proceedings also include comments on the Fuel Cells Program from the viewpoint of DOE/METC Fuel Cell Overview by Rita A. Bajura, DOE/METC Perspective by Manville J. Mayfield, Electric Power Research Institute by Daniel M. Rastler, Natural Gas by Hugh D. Guthrie, and Transportation Applications by Pandit G. Patil.

  5. Lessons Learned about Post-Tenure Review from the AAHE Peer Review of Teaching Project.

    Science.gov (United States)

    Taylor, James W.

    1999-01-01

    Describes use of a strategy adapted from the American Association for Higher Education's Peer Review of Teaching Project, the "reflective memo," to provide backward and forward view of post-tenure reviews in the chemistry department of the University of Wisconsin (Madison). The approach served as a guide in review of research, teaching,…

  6. Low-Cost Solar Array Project. Progress report 14, August 1979-December 1979 and proceedings of the 14th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period August through November 1979, is described. Progress on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering, and operations, and the steps taken to integrate these efforts are detailed. A report on the Project Integration Meeting held December 5-6, 1979, including copies of the visual materials used, is presented.

  7. Low-Cost Solar Array Project. Progress report 12, January-April 1979 and proceedings of the 12th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    This report describes progress made by the Low-Cost Solar Array Project during the period January through April 1979. It includes reports on project analysis and integration; technology development in silicon material, large-area sheet silicon, and encapsulation; production process and equipment development; engineering and operations, and a discussion of the steps taken to integrate these efforts. It includes a report on, and copies of viewgraphs presented at the Project Integration Meeting held April 4-5, 1979.

  8. Minutes of the Tank Waste Science Panel meeting, July 20, 1990: Hanford Tank Safety Project

    International Nuclear Information System (INIS)

    Strachan, D.M.; Morgan, L.G.

    1991-02-01

    The second meeting of the Tank Waste Science Panel was held July 20, 1990. Science Panel members discussed the prioritization of various analyses to be performed on core samples from tank 101-SY, and were asked to review and comment on the draft Westinghouse Hanford Company document ''Analytical Chemistry Plan.'' They also reviewed and discussed the initial contributions to the report titled Chemical and Physical Processes in Tank 101-SY: A Preliminary Report. Science Panel members agreed that a fundamental understanding of the physical and chemical processes in the tank is essential, and strongly recommended that no remediation measures be taken until there is a better understanding of the chemical and physical phenomena that result in the episodic gas release from tank 101-SY. 1 ref

  9. Project BudBurst - Meeting the Needs of Climate Change Educators and Scientists

    Science.gov (United States)

    Henderson, S.

    2015-12-01

    It is challenging for many to get a sense of what climate change means as long periods of time are involved - like decades - which can be difficult to grasp. However, there are a number of citizen science based projects, including NEON's Project BudBurst, that provide the opportunity for both learning about climate change and advancing scientific knowledge. In this presentation, we will share lessons learned from Project BudBurst. Project BudBurst is a national citizen science initiative designed to engage the public in observations of phenological (plant life cycle) events and to increase climate literacy. Project BudBurst is important from an educational perspective, but also because it enables scientists to broaden the geographic and temporal scale of their observations. The goals of Project BudBurst are to 1) increase awareness of phenology as an area of scientific study; 2) Increase awareness of the impacts of changing climates on plants at a continental-scale; and 3) increase science literacy by engaging participants in the scientific process. It was important to better understand if and how Project BudBurst is meeting its goals. Specifically, does participation by non-experts advance scientific knowledge? Does participation advance educational goals and outcomes? Is participation an effective approach to advance/enhance science education in both formal and informal settings? Critical examination of Project BudBurst supports advancement of scientific knowledge and realization of educational objectives. Citizen science collected observations and measurements are being used by scientists as evidenced by the increase of such data in scientific publication. In addition, we found that there is a significant increase in educators utilizing citizen science as part of their instruction. Part of this increase is due to the resources and professional development materials available to educators. Working with partners also demonstrated that the needs of both science and

  10. Final design review report for K basin dose reduction project

    International Nuclear Information System (INIS)

    Blackburn, L.D.

    1996-01-01

    The strategy for reducing radiation dose originating from radionuclides absorbed in the K East Basin concrete is to raise the pool water level to provide additional shielding. This report documents a final design review for cleaning/coating basin walls and modifying other basin components where appropriate. The conclusion of this review was that the documents developed constitute an acceptable design for the Dose Reduction Project

  11. Proceedings of the fourth annual fuel cells contractors review meeting

    International Nuclear Information System (INIS)

    Huber, W.J.

    1992-07-01

    Objective of the program was to develop the essential technology for private sector commercialization of various fuel cell electrical generation systems, which promise high fuel efficiencies (40--60%), possibilities for cogeneration, modularity, possible urban siting, and low emissions. Purpose of this meeting was to provide the R and D participants in the DOE/Fossil Energy-sponsored Fuel Cells Program with a forum. With the near commercialization of phosphoric acid fuel cells, major emphasis was on molten carbonate and solid oxide fuel cells. 22 papers were given in 3 formal sessions: molten carbonate fuel cells; solid oxide fuel cells; and systems and phosphoric acid. In addition, the proceedings also include a welcome to METC address and comments on the Fuel Cells program from the viewpoint of EPRI and DOE's vehicular fuel cell program. Separate abstracts have been prepared

  12. Design for Sustainability and Project Management Literature – A Review

    DEFF Research Database (Denmark)

    Ali, Faheem; Boks, Casper; Bey, Niki

    2016-01-01

    management literature has hardly been considered in design for sustainability research, this article attempts to review the points of intersection between these two fields, and explores the potential that knowledge from project management literature has in improving efficiency and effectiveness...... of development and implementation of design for sustainability tools.......The growing pressure on natural resources and increasing global trade have made sustainability issues a prime area of concern for all businesses alike. The increased focus on sustainability has impacted the way projects are conceived, planned, executed and evaluated in industries. Since project...

  13. 78 FR 27243 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-05-09

    ... U.S.C. App.), notice is hereby given of the following meetings. The meetings will be closed to the public in accordance with the provisions set forth in sections 552b(c)(4) and 552b(c)(6), Title 5 U.S.C... Center, 7400 Wisconsin Avenue, Bethesda, MD 20814. Contact Person: Yi-Hsin Liu, Ph.D., Scientific Review...

  14. Quarterly Report 11 for the Period October 1978 - December 1978 and Proceedings of the 11th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-10-01

    This report describes progress made by the Low-Cost Solar Array Project during the period October through December 1978. It includes task reports on silicon material processing, large-area silicon sheet development, encapsulation mate3rials testing and development, Project engineering and operations, and manufacturing techniques, plus the steps taken to integrate these efforts. it also includes a report on and copies of viewgraphs presented at the Project Integration Meeting held December 13-14, 1978.

  15. Progress Report 16 for the period April-September 1980, and the proceedings of the 16th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    McDonald, R.R.

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period April to September 1980, is reported in detail. Progress on project analysis and integration; technology development in silicon material, large-area silicon sheet and encapsulation; production process and equipment development; engineering, and operations is described. A report on, and copies of visual presentations made at, the Project Integration Meeting held September 24 and 25, 1980 are included.

  16. IOC-UNEP review meeting on oceanographic processes of transport and distribution of pollutants in the sea

    International Nuclear Information System (INIS)

    1991-01-01

    The IOC-UNEP Review Meeting on Oceanographic Processes of Transfer and Distribution of Pollutants in the Sea was opened at the Ruder Boskovic Institute, Zagreb, Yugoslavia on Monday, 15 May 1989. Papers presented at the meeting dealt with physical and geochemical processes in sea-water and sediment in transport mixing and dispersal of pollutants. The importance of mesoscale eddies and gyres in the open sea, wind-driven currents and upwelling events in the coastal zone, and thermohaline processes in semi-enclosed bays and estuaries was recognized. There is strong evidence that non-local forcing can drive circulation in the coastal area. Concentrations, horizontal and vertical distributions and transport of pollutants were investigated and presented for a number of coastal areas. Riverine and atmospheric inputs of different pollutants to the western Mediterranean were discussed. Reports on two on-going nationally/internationally co-ordinated projects (MEDMODEL, EROS 2000) were presented. Discussions during the meeting enabled an exchange of ideas between specialists in different disciplines to be made. It is expected that this will promote the future interdisciplinary approach in this field. The meeting recognized the importance of physical oceanographic studies in investigating the transfer and distribution of pollutants in the sea and in view of the importance of the interdisciplinary approach and bilateral and/or multilateral co-operation a number of recommendations were adopted

  17. 77 FR 66623 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2012-11-06

    ... personal privacy. Name of Committee: Center for Scientific Review Special Emphasis Panel; Program Project: Mass Spectrometry Resource. Date: November 26-28, 2012. Time: 7:00 p.m. to 12:00 p.m. Agenda: To review... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Center for Scientific Review...

  18. The Virtual Factory Teaching System (VFTS): Project Review and Results.

    Science.gov (United States)

    Kazlauskas, E. J.; Boyd, E. F., III; Dessouky, M. M.

    This paper presents a review of the Virtual Factory Teaching (VFTS) project, a Web-based, multimedia collaborative learning network. The system allows students, working alone or in teams, to build factories, forecast demand for products, plan production, establish release rules for new work into the factory, and set scheduling rules for…

  19. 76 FR 60774 - Review and Approval of Projects

    Science.gov (United States)

    2011-09-30

    ... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Part 806 Review and Approval of Projects AGENCY: Susquehanna River Basin Commission. ACTION: Notice of proposed rulemaking; reopening of comment period. SUMMARY: The purpose of this document is to inform the public of an extension of the comment period for...

  20. 77 FR 14272 - Review and Approval of Projects

    Science.gov (United States)

    2012-03-09

    ... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Part 806 Review and Approval of Projects CFR Correction In Title 18 of the Code of Federal Regulations, Part 400 to End, revised as of April 1, 2011, on page 118, in Sec. 806.6, (b)(1)(i) and (ii) are removed. [FR Doc. 2012-5837 Filed 3-8-12; 8:45 am] BILLING...

  1. Proceedings of the coal-fired power systems 94: Advances in IGCC and PFBC review meeting. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, H.M.; Staubly, R.K.; Venkataraman, V.K. [eds.

    1994-06-01

    The Coal-Fired Power Systems 94 -- Advances in IGCC and PFBC Review Meeting was held June 21--23, 1994, at the Morgantown Energy Center (METC) in Morgantown, West Virginia. This Meeting was sponsored and hosted by METC, the Office of Fossil Energy, and the US Department of Energy (DOE). METC annually sponsors this conference for energy executives, engineers, scientists, and other interested parties to review the results of research and development projects; to discuss the status of advanced coal-fired power systems and future plans with the industrial contractors; and to discuss cooperative industrial-government research opportunities with METC`s in-house engineers and scientists. Presentations included industrial contractor and METC in-house technology developments related to the production of power via coal-fired Integrated Gasification Combined Cycle (IGCC) and Pressurized Fluidized Bed Combustion (PFBC) systems, the summary status of clean coal technologies, and developments and advancements in advanced technology subsystems, such as hot gas cleanup. A keynote speaker and other representatives from the electric power industry also gave their assessment of advanced power systems. This meeting contained 11 formal sessions and one poster session, and included 52 presentations and 24 poster presentations. Volume I contains papers presented at the following sessions: opening commentaries; changes in the market and technology drivers; advanced IGCC systems; advanced PFBC systems; advanced filter systems; desulfurization system; turbine systems; and poster session. Selected papers have been processed separately for inclusion in the Energy Science and Technology Database.

  2. Baseline review of the U.S. LHC Accelerator project

    International Nuclear Information System (INIS)

    1998-02-01

    The Department of Energy (DOE) Review of the U.S. Large Hadron Collider (LHC) Accelerator project was conducted February 23--26, 1998, at the request of Dr. John R. O'Fallon, Director, Division of High Energy Physics, Office of Energy Research, U.S. DOE. This is the first review of the U.S. LHC Accelerator project. Overall, the Committee found that the U.S. LHC Accelerator project effort is off to a good start and that the proposed scope is very conservative for the funding available. The Committee recommends that the project be initially baselined at a total cost of $110 million, with a scheduled completion data of 2005. The U.S. LHC Accelerator project will supply high technology superconducting magnets for the interaction regions (IRs) and the radio frequency (rf) straight section of the LHC intersecting storage rings. In addition, the project provides the cryogenic support interface boxes to service the magnets and radiation absorbers to protect the IR dipoles and the inner triplet quadrupoles. US scientists will provide support in analyzing some of the detailed aspects of accelerator physics in the two rings. The three laboratories participating in this project are Brookhaven National Laboratory, Fermi National Accelerator Laboratory (Fermilab), and Lawrence Berkeley National Laboratory. The Committee was very impressed by the technical capabilities of the US LHC Accelerator project team. Cost estimates for each subsystem of the US LHC Accelerator project were presented to the Review Committee, with a total cost including contingency of $110 million (then year dollars). The cost estimates were deemed to be conservative. A re-examination of the funding profile, costs, and schedules on a centralized project basis should lead to an increased list of deliverables. The Committee concluded that the proposed scope of US deliverables to CERN can be readily accomplished with the $110 million total cost baseline for the project. The current deliverables should serve as

  3. Barriers to Implementing the ACGME Outcome Project: A Systematic Review of Program Director Surveys.

    Science.gov (United States)

    Malik, Mohammad U; Diaz Voss Varela, David A; Stewart, Charles M; Laeeq, Kulsoom; Yenokyan, Gayane; Francis, Howard W; Bhatti, Nasir I

    2012-12-01

    The Accreditation Council for Graduate Medical Education (ACGME) introduced the Outcome Project in July 2001 to improve the quality of resident education through competency-based learning. The purpose of this systematic review is to determine and explore the perceptions of program directors regarding challenges to implementing the ACGME Outcome Project. We used the PubMed and Web of Science databases and bibliographies for English-language articles published between January 1, 2001, and February 17, 2012. Studies were included if they described program directors' opinions on (1) barriers encountered when attempting to implement ACGME competency-based education, and (2) assessment methods that each residency program was using to implement competency-based education. Articles meeting the inclusion criteria were screened by 2 researchers. The grading criterion was created by the authors and used to assess the quality of each study. The survey-based data reported the opinions of 1076 program directors. Barriers that were encountered include: (1) lack of time; (2) lack of faculty support; (3) resistance of residents to the Outcome Project; (4) insufficient funding; (5) perceived low priority for the Outcome Project; (6) inadequate salary incentive; and (7) inadequate knowledge of the competencies. Of the 6 competencies, those pertaining to patient care and medical knowledge received the most responses from program directors and were given highest priority. The reviewed literature revealed that time and financial constraints were the most important barriers encountered when implementing the ACGME Outcome Project.

  4. [Review and analysis of the review results of Taiwan nurses association nursing projects (2011~2013)].

    Science.gov (United States)

    Chang, Li-Yin; Chen, Yu-Chih; Huang, Kuang-Chi; Huang, Jui-Lan; Lee, Tso-Ying

    2015-04-01

    Nursing projects are a key part of N4 professional competency training for nursing personnel. Low passage rates for these projects have been shown to negatively affect the intent of nursing personnel to advance further in the nursing ladder system. This study analyzes the scores for nursing projects between 2011 and 2013, the passage rate for these projects, and the differences in passage rates between different types of projects. This retrospective and descriptive study collected data on nursing projects conducted under the auspices of the Taiwan Nurses Association between 2011 and 2013. Furthermore, the comments of reviewers on 100 nursing projects were randomly selected and subjected to content analysis. A total of 3,359 nursing projects were examined. Eliminating unqualified nursing projects left a total of 3,246 projects for the dataset. A total of 1,099 projects were scored with passing grades, giving a passing rate of 33.9%. The authors of these passing projects worked primarily in northern Taiwan, worked in medical centers, and worked in intensive care departments. The projects submitted by authors in central Taiwan had the highest average score and passing rate, while those living in offshore islands had the lowest average score and passing rate. Most of the project topics belonged to the category: "improvement of nursing service skills or quality" (77.3%). Items with the lowest scores were: validation of questions, analysis of the current situation, and evaluation of results. The topics of nursing projects did not relate significantly to passing rate. However, years of experience, geographic location of hospital, level of institution, and department each had a statistically significant impact on the passage rate. A content analysis of reviewer comments was used to extract common problems. Most of the positive comments were related to the category of "literature review and reference", while most of the negative comments were related to the categories of

  5. The sustainable project management: A review and future possibilities

    Directory of Open Access Journals (Sweden)

    V.K. Chawla

    2018-06-01

    Full Text Available Sustainability in project operations such as financial, social and environmental sustainability is one of the most prominent issues of the present times to address. The increased focus on sus-tainable business operations has changed the viewpoint of researchers and corporate community towards the project management. Today sustainability in business operations along with sustain-ability of natural and environmental resources are of paramount significance which has further caused a huge impact on conception, planning, scheduling and execution of the project manage-ment activities. In this paper, a literature review between 1987 and 2018 on different issues af-fecting the sustainability in project management is carried out. The present study also identifies and discusses the future possibilities to apply computational procedures in order to estimate and optimize the sustainability issues in the management of projects, for example the computational evolutionary algorithms can be applied to formulate the multi-objective decision-making problem after considering critical factors of sustainability in the projects and then yielding optimized solu-tions for the formulated problem to achieve sustainability in the projects. A new integrated framework with the inclusion of feedback function for assessment of each decision and actions taken towards the sustainability of the projects is also identified and presented.

  6. SPI Project Criticality Task Force initial review and assessment

    International Nuclear Information System (INIS)

    McKinley, K.B.; Cannon, J.W.; Marsden, R.S.; Worle, H.A.

    1980-03-01

    The Slagging Pyrolysis Incinerator (SPI) Facility is being developed to process transuranic waste stored and buried at the Idaho National Engineering Laboratory (INEL) into a chemically inert, physically stable, basalt-like residue acceptable for a Federal Repository. A task force was established by the SPI Project Division to review and assess all aspects of criticality safety for the SPI Facility. This document presents the initial review, evaluations, and recommendations of the task force and includes the following: background information on waste characterization, and criticality control approaches and philosophies, a description of the SPI Facility Waste Processing Building, a review and assessment of potentially relevant codes and regulations; a review and assessment of the present state of criticality and assaying/monitoring studies, and recommendations for changes in and additions to these studies. The review and assessment of potentially relevant codes and regulations indicate that ERDAM 0530, Nuclear Criticality Safety should be the controlling document for criticality safety for the SPI Project. In general, the criticality control approaches and philosophies for the SPI Project comply with this document

  7. Project risk management: A review of an institutional project life cycle

    Directory of Open Access Journals (Sweden)

    Wanjiru Gachie

    2017-11-01

    Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects

  8. The Halden Reactor Project workshop meeting on human centred automation and function allocation methods

    International Nuclear Information System (INIS)

    Sebok, Angelia; Green, Marit; Larsen, Marit; Miberg, Ann Britt; Morisseau, Dolores

    1998-02-01

    A workshop on Human Centred Automation (HCA) and Function Allocation Methods was organised in Halden, September 29-30, 1997. The purpose of the workshop was to discuss and make recommendations on requirements for the Halden Project research agenda. The workshop meeting began with several presentations summarising current issues in HCA, Function Allocation Methods and Functional Modelling. Invited speakers presented their research or modelling efforts. Following the presentations, the workshop was divided into three working groups, all tasked with answering the same four questions: (1) What are the most important issues in Human Centred Automation? (2) Which strengths could be achieved by integrating Functional Modelling Methods into experimental Human Centred Automation research? (3) How should analytical and experimental methods be balanced? (4) What are the most important aspects in automation design methodology? Each group discussed the questions and produced specific recommendations that were summarised by the group's facilitator in a joint session of the workshop. (author)

  9. First research coordination meeting of the coordinated research project on validation of tracers and software for interwell investigations. Meeting report

    International Nuclear Information System (INIS)

    2004-01-01

    . The introduction and promotion of tracer techniques for oil producing industry have been going on through several national and regional technical cooperation projects. Presently, R and D is going on in interwell tracer technology, including development of new tracers, improvement of analytical and interpretation techniques, and other innovative techniques for multiphase flow pattern characterization. The CRP coordinates knowledge generated in this field to guarantee the continuity of technology and to transfer the best part to developing countries. For effective transfer of the technology to developing countries, the target techniques will be consolidated, developed further and validated though the CRP activities. Technical documents will also be prepared to facilitate upgradation of the capability of tracer groups in developing countries. In line with the CRP objectives, the first RCM summarized the status of tracer technology as applied to interwell tests and discussed the ways to meet the proposed goals. The proposed investigations were focused on three main fields: 1) Software and model development and interpretation, 2) development of new tracers, methods and technologies, and 3) field applications. All participants were encouraged to participate in one or more of these topics of discussion and establish networking activities

  10. Results of the 3rd Review Meeting of the Convention on Nuclear Safety and Preparatory Works for the 4th Meeting

    International Nuclear Information System (INIS)

    Choi, Young Sung; Choi, Kwang Sik; Kim, Woong Sik

    2006-01-01

    The 3 rd Review Meeting of the Convention on Nuclear Safety (CNS) took place from April 11-22, 2005. Fifty out of fifty-five Contracting Parties (CPs) participated with over 500 delegates in attendance. It was concluded that all CPs in attendance were in compliance with the requirements of the CNS. It was also noted that although the focus tends to be on the triennial national reports and review meetings, the CNS should emphasize an ongoing process that continually promotes the advancement of nuclear safety. With regard to this continuity process, the President of the 3 rd Review Meeting sent to all the CPs a message to remind of the lessons offered and learned from the Meeting and to put them into action as well. The president also asked that the CPs start in earnest later this year their preparations for the Forth Meeting in 2008. This paper introduces the results of the 3 rd Review Meeting and presents some suggestions on preparatory works that should be done for the next Review Meeting

  11. Review on Population Projection Methodology for Radiological Dose Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Jang, M. S.; Kang, H. S.; Kim, S. R. [NESS, Daejeon (Korea, Republic of); Hwang, W. T. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Yang, Y. H. [KHNP, Daejeon (Korea, Republic of)

    2015-05-15

    Radiation environment report (RER), one of the essential documents in plant operating license or continuous operation license, includes population projection. Population estimates are utilized in determining the collective dose at the operation or restart time of nuclear power plant. Many population projection models are suggested and also under development. We carried out the sensitivity analysis on various population projection models to Daejeon city as a target. Daejeon city showed the increase or decrease in the cross-sectional population, because of the development of Sejong city, Doan new town and etc. We analyzed the population of Daejeon city using statistical ARIMA model and various simple population projection models. It is important to determine the population limit in Modified exponential model but it is not easy. Therefore, the various properties of the area such as the decrease and increase of population, new town development plan, social and natural environment change and etc., should be carefully reviewed to estimate the future population of any area.

  12. Review on Population Projection Methodology for Radiological Dose Assessment

    International Nuclear Information System (INIS)

    Jang, M. S.; Kang, H. S.; Kim, S. R.; Hwang, W. T.; Yang, Y. H.

    2015-01-01

    Radiation environment report (RER), one of the essential documents in plant operating license or continuous operation license, includes population projection. Population estimates are utilized in determining the collective dose at the operation or restart time of nuclear power plant. Many population projection models are suggested and also under development. We carried out the sensitivity analysis on various population projection models to Daejeon city as a target. Daejeon city showed the increase or decrease in the cross-sectional population, because of the development of Sejong city, Doan new town and etc. We analyzed the population of Daejeon city using statistical ARIMA model and various simple population projection models. It is important to determine the population limit in Modified exponential model but it is not easy. Therefore, the various properties of the area such as the decrease and increase of population, new town development plan, social and natural environment change and etc., should be carefully reviewed to estimate the future population of any area

  13. Report of the International Review Committee of the joint proposal of the Japan Hadron Facility (KEK) and the Neutron Science Project (JAERI)

    International Nuclear Information System (INIS)

    1999-08-01

    The International Review Committee composed of twelve Japanese and foreign experts was set up under the Research Evaluation Committee of JAERI, and has reviewed the proposed joint project combining JAERI's Neutron Science Project and KEK's Japan Hadron Facility into one major facility. The review meeting took place on April 26-27, 1999, at JAERI Head quarters, Tokyo. According to the points of review given in advance, the review was implemented based on the joint project report submitted and presentations of both institutions. The Research Evaluation Committee received the review report and its explanations from the Review Committee on July 5. The Research Evaluation Committee has acknowledged appropriateness of the review results. This report describes the review results. (author)

  14. When Intrusion Detection Meets Blockchain Technology: A Review

    DEFF Research Database (Denmark)

    Meng, Weizhi; Tischhauser, Elmar Wolfgang; Wang, Qingju

    2018-01-01

    developed, which allow IDS nodes to exchange data with each other. However, data and trust management still remain two challenges for current detection architectures, which may degrade the effectiveness of such detection systems. In recent years, blockchain technology has shown its adaptability in many...... fields such as supply chain management, international payment, interbanking and so on. As blockchain can protect the integrity of data storage and ensure process transparency, it has a potential to be applied to intrusion detection domain. Motivated by this, this work provides a review regarding...... the intersection of IDSs and blockchains. In particular, we introduce the background of intrusion detection and blockchain, discuss the applicability of blockchain to intrusion detection, and identify open challenges in this direction....

  15. Consultants' Meeting on Review Benchmarking of Nuclear Data for the Th/U Fuel Cycle. Summary Report

    International Nuclear Information System (INIS)

    Capote Noy, R.

    2011-02-01

    A summary is given of the Consultants' Meeting (CM) on Review and Benchmarking of Nuclear Data for the Th/U Fuel Cycle. An IAEA Coordinated Research Project (CRP) on 'Nuclear Data for Th/U Fuel Cycle' was concluded in 2005. The CRP activities resulted in new evaluated nuclear data files for 232 Th, 231 , 233 Pa (later adopted for the ENDF/B-VII.0 library) and improvements to existing evaluations for 232 , 233 , 234 , 236 U. Available nuclear data evaluations for 230 - 232 Th, 231,233 Pa and 232 , 233 , 234 U were reviewed including ROSFOND2010, CENDL-3.1, JENDL-4, JEFF-3.1.1, MINSKACT, and ENDF/B-VII.0 libraries. Benchmark results of available evaluations for 232 Th and 233 U were also discussed. (author)

  16. Researchers' experience with project management in health and medical research: Results from a post-project review

    Science.gov (United States)

    2011-01-01

    Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721

  17. The Greenland Analogue Project (GAP). Literature review of hydrogeology/ hydrogeochemistry

    International Nuclear Information System (INIS)

    Wallroth, Thomas; Lokrantz, Hanna; Rimsa, Andrius

    2010-09-01

    This report is produced as part of the Greenland Analogue Project (GAP), carried out as a collaboration project with the Canadian Nuclear Waste Management Organization (NWMO), Posiva Oy and the Swedish Nuclear Fuel and Waste Management Co (SKB). The overall aim of the project is to improve the current understanding of hydrogeological and hydrogeochemical processes associated with continental-scale glacial periods including with the presence of permafrost and the advance/retreat of ice sheets. The project will focus on studying how an ice sheet affects groundwater flow and water chemistry around a deep geological repository in crystalline bedrock. The Greenland Analogue Project consists of three active sub-projects (A-C) with individual objectives. Field studies are conducted in the Kangerlussuaq region, in central Western Greenland. Sub-projects A and B collectively aim at improving the understanding of ice sheet hydrology by combining investigations on surface water processes with ice sheet drilling and instrumentation. In sub-project C, the penetration of glacial melt water into the bedrock, groundwater flow and the chemical composition of water will be studied. Main planned activities in sub-project C include drilling of a deep borehole in front of the ice sheet, in which different downhole surveys, sampling and monitoring will be carried out. The primary aim of this report is to review available information about hydrogeology and hydrogeochemistry in central Western Greenland, with special emphasis on the area around Kangerlussuaq. The relevant information about this area is however very limited, and it was decided to extend the review to briefly include studies made in other regions with similar conditions in terms of geology, climate and glaciology. The number of published studies made in other areas with glaciers, ice sheets or permafrost is very large, and the review and list of references in this report is far from complete. It is also obvious that both

  18. The Greenland Analogue Project (GAP). Literature review of hydrogeology/ hydrogeochemistry

    Energy Technology Data Exchange (ETDEWEB)

    Wallroth, Thomas; Lokrantz, Hanna; Rimsa, Andrius (Bergab Consulting Geologists, Goeteborg (Sweden))

    2010-09-15

    This report is produced as part of the Greenland Analogue Project (GAP), carried out as a collaboration project with the Canadian Nuclear Waste Management Organization (NWMO), Posiva Oy and the Swedish Nuclear Fuel and Waste Management Co (SKB). The overall aim of the project is to improve the current understanding of hydrogeological and hydrogeochemical processes associated with continental-scale glacial periods including with the presence of permafrost and the advance/retreat of ice sheets. The project will focus on studying how an ice sheet affects groundwater flow and water chemistry around a deep geological repository in crystalline bedrock. The Greenland Analogue Project consists of three active sub-projects (A-C) with individual objectives. Field studies are conducted in the Kangerlussuaq region, in central Western Greenland. Sub-projects A and B collectively aim at improving the understanding of ice sheet hydrology by combining investigations on surface water processes with ice sheet drilling and instrumentation. In sub-project C, the penetration of glacial melt water into the bedrock, groundwater flow and the chemical composition of water will be studied. Main planned activities in sub-project C include drilling of a deep borehole in front of the ice sheet, in which different downhole surveys, sampling and monitoring will be carried out. The primary aim of this report is to review available information about hydrogeology and hydrogeochemistry in central Western Greenland, with special emphasis on the area around Kangerlussuaq. The relevant information about this area is however very limited, and it was decided to extend the review to briefly include studies made in other regions with similar conditions in terms of geology, climate and glaciology. The number of published studies made in other areas with glaciers, ice sheets or permafrost is very large, and the review and list of references in this report is far from complete. It is also obvious that both

  19. Challenges and Approaches to Make Multidisciplinary Team Meetings Interoperable - The KIMBo Project.

    Science.gov (United States)

    Krauss, Oliver; Holzer, Karl; Schuler, Andreas; Egelkraut, Reinhard; Franz, Barbara

    2017-01-01

    Multidisciplinary team meetings (MDTMs) are already in use for certain areas in healthcare (e.g. treatment of cancer). Due to the lack of common standards and accessibility for the applied IT systems, their potential is not yet completely exploited. Common requirements for MDTMs shall be identified and aggregated into a process definition to be automated by an application architecture utilizing modern standards in electronic healthcare, e.g. HL7 FHIR. To identify requirements, an extensive literature review as well as semi-structured expert interviews were conducted. Results showed, that interoperability and flexibility in terms of the process are key requirements to be addressed. An architecture blueprint as well as an aggregated process definition were derived from the insights gained. To evaluate the feasibility of identified requirements, methods of explorative prototyping in software engineering were used. MDTMs will become an important part of modern and future healthcare but the need for standardization in terms of interoperability is imminent.

  20. 17th Business Report Meeting of New Energy Industrial Technology Development Organization (NEDO). Section Meeting on International Cooperation Projects; Dai 17 kai jigyo hokokukai. Kokusai kyoryoku jigyo bunkakai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    In this section meeting, reports were made on the following themes: 1) pregrinder model project; 2) power recovery model project; 3) energy conservation model project and the importance of the spread. In 1), this model project aims to demonstrate that the electric power unit requirement for cement production can be reduced by installing a pregrinder at the front step of ball mill as the finish process at a cement factory in Indonesia, increasing capacity of ball mill grinding, and reducing operational loads of the ball mill which is large in power consumption. In 2), this project aims to supply China a technology to recover power from high temperature/high pressure exhaust gas via gas expander as electric power of 5.8MW after separating FCC catalyst associated with from the exhaust gas from the generative tower of fluid catalytic cracking equipment for oil refining. To come up to expectations for Japan from neighboring countries in Asia, NEDO Information Center carried out the energy conservation model project, etc. as the international cooperation related project in the energy/environment field. The center is now developing 10 projects. (NEDO)

  1. A desk evaluation review of project RAF/9/005 radiation protection development. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    The Agency has been assisting member nations through a number of national TC projects in radiation protection and related areas over the years. In addition, a regional project RAF/9/005 - Radiation Protection Development (which is under this review) was approved in 1988, with the aim of assessing existing radiation protection practices in the African Member States in relation to the Agency's new basic safety standards for radiation protection, and to advise Governments on improvements. The project was subsequently extended up to 1994 as an umbrella project to assist all African Member States in the development of appropriate radiation protection services; to co-ordinate the implementation of the relevant national TC projects; and to develop co-operation amongst groups of Member States on a regional and sub-regional basis. Particular emphasis was to be given to manpower development through workshops, seminars and training courses in radiation protection and safety. In parallel thereto, the Agency's Radiation Protection Advisory Teams (RAPATs) visited nineteen African Member States during the period 1986 through 1993, to review and assess their radiation protection activities, identify priorities, and design long-term radiation protection programmes. RAPAT findings and recommendations were considered in drawing up programmes for implementation under project RAF/9/005

  2. Review Essay: Situational Analysis—Strauss Meets Foucault?

    Directory of Open Access Journals (Sweden)

    Rainer Diaz-Bone

    2012-11-01

    Full Text Available With the (German translation of the volume "Situational Analysis" by Adele CLARKE, a new approach to the development of Grounded Theory Methodology (GTM is presented. CLARKE radicalizes the methodological standpoint of classical pragmatism. She integrates structuralist and post-structuralist analytic elements into GTM. This review essay critically analyzes this new integration and employs the methodological notion of the "theory/methods package" introduced by CLARKE, which denotes the cohesion of theory, methodology and methods, and can be conceived as a kind of “methodic holism” (not to be confused with the different concept of methodological holism. CLARKE puts more emphasis on objects and power than classical GTM, and attempts to integrate a FOUCAULTian discourse model. However, she does not succeed in integrating the pragmatic and structuralist/post-structuralist methodologies in a fully coherent way. Her situational analysis does not incorporate a discourse-analytic methodology, and has not implemented the methods needed for a FOUCAULTian discourse analysis. Nevertheless, this valuable work presents an important development in pragmatic social research. URN: http://nbn-resolving.de/urn:nbn:de:0114-fqs1301115

  3. 77 FR 61009 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2012-10-05

    ... Committee: Center for Scientific Review Special Emphasis Panel; Program Project: Prenatal Stress and Child..., [email protected] . (Catalogue of Federal Domestic Assistance Program Nos. 93.306, Comparative Medicine...

  4. 78 FR 36553 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-06-18

    ...: Revision applications for research on assessing the role of Stigma in HIV prevention and care. Date: [email protected] . Name of Committee: Center for Scientific Review Special Emphasis Panel; Program Project...

  5. 75 FR 30859 - Meeting of the Public Safety Officer Medal of Valor Review Board

    Science.gov (United States)

    2010-06-02

    ... INFORMATION: The Public Safety Officer Medal of Valor Review Board carries out those advisory functions... participate must register at least seven (7) days in advance of the meeting/conference call by contacting Mr.... Anyone requiring special accommodations should contact Mr. Joy at least seven (7) days in advance of the...

  6. 76 FR 37375 - Meeting of the Public Safety Officer Medal of Valor Review Board

    Science.gov (United States)

    2011-06-27

    ... INFORMATION: The Public Safety Officer Medal of Valor Review Board carries out those advisory functions... who wish to participate must register at least seven (7) days in advance of the meeting/conference... registration. Anyone requiring special accommodations should contact Mr. Joy at least seven (7) days in advance...

  7. Proceedings of the natural gas RD&D contractors review meeting, Volume I

    Energy Technology Data Exchange (ETDEWEB)

    Malone, R.D.

    1995-04-01

    This report contains papers which were presented at the natural gas contractors review meeting held on April 4-6, 1995. Topics were concerned with resource and reserves, low permeability reservoir characterization, natural fracture detection, drilling, completion, and stimulation, and natural gas upgrading. Individual papers were processed separately for the United States Department of Energy databases.

  8. 77 FR 55833 - Announcement of Public Meeting on the Consumer Confidence Report (CCR) Rule Retrospective Review...

    Science.gov (United States)

    2012-09-11

    ... on the Consumer Confidence Report (CCR) Rule Retrospective Review and Request for Public Comment on... potential approaches for providing Consumer Confidence Reports (CCR) via electronic delivery. EPA plans to... meeting to give EPA time to process your request. Background Consumer Confidence Reports are a key part of...

  9. 77 FR 57566 - Announcement of Public Meeting on the Consumer Confidence Report (CCR) Rule Retrospective Review...

    Science.gov (United States)

    2012-09-18

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OW-2012-0035; FRL-9730-7] Announcement of Public Meeting on the Consumer Confidence Report (CCR) Rule Retrospective Review and Request for Public Comment on Potential Approaches to Electronic Delivery of the CCR; Correction AGENCY: Environmental Protection Agency...

  10. 78 FR 46358 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-07-31

    ..., (Telephone Conference Call). Contact Person: Careen K Tang-Toth, Ph.D., Scientific Review Officer, Center for... Emphasis Panel; Member Conflict: Cognition and Perception. Date: August 28-29, 2013. Time: 8:00 a.m. to 6... Rockledge Drive, Bethesda, MD 20892, (Virtual Meeting). Contact Person: Mark Lindner, Ph.D., Scientific...

  11. Proceedings of the advanced coal-fired power systems `95 review meeting, Volume II

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, H.M.; Mollot, D.J.; Venkataraman, V.K.

    1995-06-01

    This report contains papers which were presented at the advanced coal-fired power sytems review meeting. This is volume II. Topics include: hot gas filter issues, hazardous air pollutants, sorbent development, and separation technologies. Individual papers were processed separately for the United States Department of Energy databases.

  12. 75 FR 26757 - National Toxicology Program (NTP); Office of Liaison, Policy and Review; Meeting of the...

    Science.gov (United States)

    2010-05-12

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Toxicology Program (NTP); Office of Liaison, Policy and Review; Meeting of the Scientific Advisory Committee on Alternative Toxicological Methods... Director, National Toxicology Program. [FR Doc. 2010-11318 Filed 5-11-10; 8:45 am] BILLING CODE 4140-01-P ...

  13. 77 FR 63847 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2012-10-17

    ... Emphasis Panel; PAR-10-235: Climate Change and Health. Date: November 8, 2012. Time: 11:30 a.m. to 6:30 p.m... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Center for Scientific Review... applications. Place: National Institutes of Health, 6701 Rockledge Drive, Bethesda, MD 20892, (Virtual Meeting...

  14. 78 FR 70567 - Center for Scientific Review; Amended Notice of Meeting

    Science.gov (United States)

    2013-11-26

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Center for Scientific Review... Institutes of Health, 6701 Rockledge Drive, Room 3091, Bethesda, MD, 20892 which was published in the Federal Register on September 18, 2013, 78 FR 57399. The meeting will be held at the Bethesda Marriott Hotel, 5151...

  15. 76 FR 4113 - Independent Scientific Peer Review Panel Meeting on an In Vitro

    Science.gov (United States)

    2011-01-24

    ... antagonist activity. These studies were funded primarily by a Small Business Innovation Research (SBIR) grant... Vitro Estrogen Receptor Transcriptional Activation Test Method for Endocrine Disruptor Chemical... Toxicological Methods (NICEATM); Announcement of an Independent Scientific Peer Review Panel Meeting on an In...

  16. 77 FR 21622 - Rehabilitation Research and Development Service Scientific Merit Review Board; Notice of Meeting

    Science.gov (United States)

    2012-04-10

    ... DEPARTMENT OF VETERANS AFFAIRS Rehabilitation Research and Development Service Scientific Merit...-463 (Federal Advisory Committee Act) that a meeting of the Rehabilitation Research and Development Service Scientific Merit Review Board will be held on April 20, 2012, 131 M Street NE., Washington, DC...

  17. 77 FR 42365 - Health Services Research and Development Service Scientific Merit Review Board, Notice of Meeting

    Science.gov (United States)

    2012-07-18

    ... DEPARTMENT OF VETERANS AFFAIRS Health Services Research and Development Service Scientific Merit...-463 (Federal Advisory Committee Act) that various subcommittees of the Health Services Research and Development Service Scientific Merit Review Board will meet on August 28-30, 2012, at the Boston Omni Parker...

  18. 75 FR 72872 - Rehabilitation Research and Development Service Scientific Merit Review Board; Notice of Meeting

    Science.gov (United States)

    2010-11-26

    ... DEPARTMENT OF VETERANS AFFAIRS Rehabilitation Research and Development Service Scientific Merit...-463 (Federal Advisory Committee Act) that a meeting of the Rehabilitation Research and Development Service Scientific Merit Review Board will be held on December 13-14, 2010, at the Hilton Alexandria Old...

  19. 78 FR 18680 - Rehabilitation Research and Development Scientific Merit Review Board, Notice of Meeting

    Science.gov (United States)

    2013-03-27

    ... DEPARTMENT OF VETERANS AFFAIRS Rehabilitation Research and Development Scientific Merit Review... Service, and the Chief Research and Development Officer on the scientific and technical merit, the mission... Committee Act, 5 U.S.C. App. 2, that a meeting of the Rehabilitation Research and Development Service...

  20. Review of the IWGFR activities for the period since the 23. annual meeting of the IWGFR

    International Nuclear Information System (INIS)

    1991-02-01

    The document reviews the activities of the International Atomic Energy Agency within the framework of the International Working Group on Fast Reactors (IWGFR) which have been carried out based on IWGFR recommendations made at the previous meetings of the Working Group

  1. 77 FR 8330 - Health Services Research and Development Service Scientific Merit Review Board; Notice of Meeting

    Science.gov (United States)

    2012-02-14

    ... Disorders; HCR 2--Substance Use Disorders; HCR 3--Rehabilitation/Rural; HCR 4--Women's Health; HCR 5--Pain... Development Service Scientific Merit Review Board will meet on March 6-8, 2012, at the Hilton New Orleans... to the Chief Research and Development Officer. On March 6, the subcommittee on Nursing Research...

  2. 78 FR 13364 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-02-27

    ... Rockledge Drive, Bethesda, MD 20892, (Virtual Meeting). Contact Person: Fouad A El-Zaatari, Ph.D... Etiology of Gastro- Intestinal Cancer. Date: March 21, 2013. Time: 12:00 p.m. to 2:00 p.m. Agenda: To... Research Integrated Review Group; AIDS-associated Opportunistic Infections and Cancer Study Section. Date...

  3. 78 FR 48654 - Fisheries of the Caribbean; Southeast Data, Assessment, and Review (SEDAR); Public Meeting

    Science.gov (United States)

    2013-08-09

    ...: Participants will present summary data and will discuss data needs and treatments. Although non-emergency... the Caribbean; Southeast Data, Assessment, and Review (SEDAR); Public Meeting AGENCY: National Marine... of SEDAR 35 data webinar for Caribbean Red Hind. SUMMARY: The SEDAR assessment of the Caribbean...

  4. 75 FR 70952 - Proposal Review Panel for Physics; Notice of Meeting

    Science.gov (United States)

    2010-11-19

    ... NATIONAL SCIENCE FOUNDATION Proposal Review Panel for Physics; Notice of Meeting In accordance with the Federal Advisory Committee Act (Pub. L. 92- 463, as amended), the National Science Foundation... Director for Elementary Particle Physics, National Science Foundation, 4201 Wilson Blvd., Arlington, VA...

  5. 76 FR 17928 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2011-03-31

    ...- 0684, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Center for... Rockledge Drive, Room 4118, MSC 7814, Bethesda, MD 20892, 301-435- 1777, [email protected]csr.nih.gov . Name of...

  6. 77 FR 65004 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2012-10-24

    ..., [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Center for Scientific..., 6701 Rockledge Drive, Room 6210, MSC 7804, Bethesda, MD 20892, 301-435- 1211, [email protected]csr.nih.gov...

  7. 75 FR 27351 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2010-05-14

    ... 20892, 301-435- 0952, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee... Rockledge Drive, Room 5116, MSC 7854, Bethesda, MD 20892, (301) 435- 1171, [email protected]csr.nih.gov . Name of...

  8. 78 FR 78985 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-12-27

    ... 7890, Bethesda, MD 20892, (301) 435-1741, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle..., (301) 435-1741, [email protected]csr.nih.gov . Name of Committee: Risk, Prevention and Health Behavior...

  9. 76 FR 33322 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2011-06-08

    ...-402-4454, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Center for..., 6701 Rockledge Drive, Room 6214, MSC 7804, Bethesda, MD 20892, (301)435-3504, [email protected]csr.nih.gov . Name...

  10. 75 FR 41212 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2010-07-15

    ..., Bethesda, MD 20892, 301-435- 1259, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of... Health, 6701 Rockledge Drive, Room 5202, MSC 7850, Bethesda, MD 20892, (301) 435-0910, [email protected]csr.nih...

  11. 76 FR 14036 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2011-03-15

    ..., [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Center for Scientific... 7852, Bethesda, MD 20892, (301) 435-1166, [email protected]csr.nih.gov . Name of Committee: Center for...

  12. 75 FR 55591 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2010-09-13

    ...-435- 0952, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Center... Rockledge Drive, Room 4214, MSC 7814, Bethesda, MD 20892, 301-435- 1781, [email protected]csr.nih.gov . Name of...

  13. 75 FR 4830 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2010-01-29

    ..., (301) 435-1767, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Center... Health, 6701 Rockledge Drive, Room 3184, MSC 7848, Bethesda, MD 20892, (301) 435-4445, [email protected]csr.nih...

  14. 78 FR 79705 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-12-31

    ... 20892-7844, 301-435-1033 [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of..., MD 20892, 301- 435-1722, [email protected]csr.nih.gov . Name of Committee: Emerging Technologies and...

  15. 75 FR 75484 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2010-12-03

    .... [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Center for Scientific..., Room 4205, MSC 7814, Bethesda, MD 20892. 301-435- 1501. [email protected]csr.nih.gov . This notice is being...

  16. 76 FR 3916 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2011-01-21

    ... 7848, Bethesda, MD 20892, (301) 435-4445, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle... 20892, 301-435- 0677, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the...

  17. 75 FR 57965 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2010-09-23

    ... Rockledge Drive, Room 1102, MSC 7760, Bethesda, MD 20892, (301) 435-1747, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by... 20892, 301-435- 1211, [email protected]csr.nih.gov . Name of Committee: Center for Scientific Review Special...

  18. 78 FR 72684 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-12-03

    ...-1246, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Center for... Health, 6701 Rockledge Drive, Room 5218, MSC 7852, Bethesda, MD 20892, 301-435- 1775, [email protected]csr.nih.gov...

  19. 75 FR 3240 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2010-01-20

    ... notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by... 20892, 301-254-9975, [email protected]csr.nih.gov . Name of Committee: Center for Scientific Review Special..., Room 6164, MSC 7892, Bethesda, MD 20892, (301) 435- 1041, [email protected]csr.nih.gov . Name of Committee...

  20. 75 FR 64736 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2010-10-20

    ...-1215, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Center for... Health, 6701 Rockledge Drive, Room 6194, MSC 7804, Bethesda, MD 20892, 301-594- 7945, [email protected]csr.nih...

  1. 76 FR 12124 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2011-03-04

    ...-435-1501, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Center for..., (301) 435-1258, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the...

  2. 78 FR 45252 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-07-26

    ... 7852, Bethesda, MD 20892, 301-435- 1775, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle... Health, 6701 Rockledge Drive, Room 3130, MSC 7850, Bethesda, MD 20892, 301-435-3009, [email protected]csr.nih.gov...

  3. 76 FR 36555 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2011-06-22

    ...-1219, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Center for..., Room 5187, MSC 7840, Bethesda, MD 20892, 301-435- 1236, [email protected]csr.nih.gov . Name of Committee...

  4. 77 FR 37685 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2012-06-22

    ..., (301) 806-2515, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Center... Health, 6701 Rockledge Drive, Room 6214, MSC 7804, Bethesda, MD 20892, 301-451-3493, [email protected]csr.nih.gov...

  5. 76 FR 14674 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2011-03-17

    ...-435- 1033, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Center for... 4142, [[Page 14675

  6. 77 FR 38849 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2012-06-29

    ... 20892, 301-435-1038, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee... Health, 6701 Rockledge Drive, Room 5208, MSC 7852, Bethesda, MD 20892, (301) 435-1165, [email protected]csr.nih...

  7. 78 FR 66754 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-11-06

    ..., Bethesda, MD 20892, 301-435- 0677, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of... 7844, Bethesda, MD 20892, (301) 806-3323, [email protected]csr.nih.gov . Name of Committee: Center for...

  8. 75 FR 48977 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2010-08-12

    .... [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Center for Scientific..., Room 5181, MSC 7844, Bethesda, MD 20892. 301-435- 1033. [email protected]csr.nih.gov . Name of Committee: Center...

  9. 76 FR 22716 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2011-04-22

    .... [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Center for Scientific..., Room 6170, MSC 7892, Bethesda, MD 20892, 301-435- 4514. [email protected]csr.nih.gov . Name of Committee...

  10. 77 FR 72362 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2012-12-05

    ..., Bethesda, MD 20892, (301) 435-1165, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of... 20892, 301-435- 1775, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to...

  11. 78 FR 13361 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-02-27

    ...-435- 1211, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Center for..., Bethesda, MD 20892, 301-435-1050, [email protected]csr.nih.gov . This notice is being published less than 15 days...

  12. 75 FR 4095 - Center For Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2010-01-26

    ..., (301) 435-1233, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Center... Rockledge Drive, Room 5202, MSC 7846, Bethesda, MD 20892, 301-435- 1175, [email protected]csr.nih.gov . Name of...

  13. 76 FR 6803 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2011-02-08

    ... 20892, (301) 435-1219, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee... Health, 6701 Rockledge Drive, Room 4811, MSC 7850, Bethesda, MD 20892 301-435-1203, [email protected]csr.nih.gov...

  14. 76 FR 31966 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2011-06-02

    ..., Bethesda, MD 20892, 301-435- 1259, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of... Health, 6701 Rockledge Drive, Room 4811, MSC 7850, Bethesda, MD 20892, 301-435-1203, [email protected]csr.nih.gov...

  15. 78 FR 48179 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-08-07

    ... 20892, (301) 435- 1712, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee... Health, 6701 Rockledge Drive, Room 4118A, MSC 7814, Bethesda, MD 20892, 301-435- 5575, [email protected]csr.nih...

  16. 76 FR 28793 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2011-05-18

    ...-435- 0696, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Oncology 2..., Room 6214, MSC 7804, Bethesda, MD 20892, 301-451- 3493, [email protected]csr.nih.gov . This notice is being...

  17. 77 FR 59198 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2012-09-26

    ... 20892, (301) 435-1741, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee... Institutes of Health, 6701 Rockledge Drive, Room 5170, MSC 7840, Bethesda, MD 20892, 301-435-2406, [email protected]csr...

  18. 76 FR 17929 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2011-03-31

    ...-435- 1050, [email protected]csr.nih.gov . This notice is being published less than 15 days prior to the meeting due to the timing limitations imposed by the review and funding cycle. Name of Committee: Center for... Health, 6701 Rockledge Drive, Room 5218, MSC 7852, Bethesda, MD 20892, 301-435- 1775, [email protected]csr.nih.gov...

  19. Proceedings of the natural gas RD&D contractors review meeting, Volume II

    Energy Technology Data Exchange (ETDEWEB)

    Malone, R.D. [ed.

    1995-04-01

    This is volume II of papers which were presented at the natural gas RD&D contractors review meeting. Topics include: natural gas upgrading, storage, well drilling, completion, and stimulation. Individual papers were processed separately for the United States Department of Energy databases.

  20. 78 FR 32260 - Center For Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-05-29

    ..., (301) 827-6390, [email protected] . Name of Committee: Digestive, Kidney and Urological Systems... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Center For Scientific Review; Notice of Closed Meetings Pursuant to section 10(d) of the Federal Advisory Committee Act, as amended (5...

  1. 78 FR 64510 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-10-29

    ... Digestive, Urinary, Cardiovascular and Pulmonary Systems. Date: November 13, 2013. Time: 12:00 p.m. to 2:30... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Center for Scientific Review; Notice of Closed Meetings Pursuant to section 10(d) of the Federal Advisory Committee Act, as amended (5...

  2. 76 FR 1442 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2011-01-10

    ...-451- 8504. [email protected] . Name of Committee: Digestive, Kidney and Urological Systems... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Center for Scientific Review; Notice of Closed Meetings Pursuant to section 10(d) of the Federal Advisory Committee Act, as amended (5...

  3. 78 FR 57866 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-09-20

    ..., 301- 237-1487, [email protected] . Name of Committee: Digestive, Kidney and Urological Systems... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Center for Scientific Review; Notice of Closed Meetings Pursuant to section 10(d) of the Federal Advisory Committee Act, as [[Page...

  4. 77 FR 56855 - Center For Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2012-09-14

    ... 20892, 301-806-2515, [email protected] . Name of Committee: Digestive, Kidney and Urological Systems... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Center For Scientific Review; Notice of Closed Meetings Pursuant to section 10(d) of the Federal Advisory Committee Act, as amended (5...

  5. 76 FR 24921 - Proposal Review Panel for Chemistry; Notice of Meeting

    Science.gov (United States)

    2011-05-03

    ... NATIONAL SCIENCE FOUNDATION Proposal Review Panel for Chemistry; Notice of Meeting In accordance with the Federal Advisory Committee Act (Pub. L. 92- 463, as amended), the National Science Foundation..., Program Director, Chemistry Centers Program, Division of Chemistry, Room 1055, National Science Foundation...

  6. 78 FR 4464 - Proposal Review Panel for Chemistry; Notice of Meeting

    Science.gov (United States)

    2013-01-22

    ... NATIONAL SCIENCE FOUNDATION Proposal Review Panel for Chemistry; Notice of Meeting In accordance with the Federal Advisory Committee Act (Pub. L. 92- 463, as amended), the National Science Foundation... Chemistry, Room 1055, National Science Foundation, 4201 Wilson Boulevard, Arlington, VA 22230, (703) 292...

  7. 76 FR 12996 - Proposal Review Panel for Chemistry; Notice of Meeting

    Science.gov (United States)

    2011-03-09

    ... NATIONAL SCIENCE FOUNDATION Proposal Review Panel for Chemistry; Notice of Meeting In accordance with the Federal Advisory Committee Act (Pub. L. 92- 463 as amended), the National Science Foundation... Director, Chemistry Centers Program, Division of Chemistry, Room 1055, National Science Foundation, 4201...

  8. 76 FR 6499 - Proposal Review Panel for Chemistry; Notice of Meeting

    Science.gov (United States)

    2011-02-04

    ... NATIONAL SCIENCE FOUNDATION Proposal Review Panel for Chemistry; Notice of Meeting In accordance with the Federal Advisory Committee Act (Pub. L. 92- 463 as amended), the National Science Foundation... Director, Chemistry Centers Program, Division of Chemistry, Room 1055, National Science Foundation, 4201...

  9. Aquatic Species Program review: proceedings of principal investigators meeting

    Energy Technology Data Exchange (ETDEWEB)

    1985-06-01

    The purpose of the Aquatic Species Program is to improve the productivity, conversion to fuels, and cost efficiency of aquatic plant culture technologies. The emphasis of the program is on developing a mass culture technology for cultivating oil-yielding microalgae in the American southwest. A technical and economic analysis indicated that such a concept would be feasible if (1) lipid yields from microalgae are improved, (2) there is sufficient saline water for large-scale development, and (3) microalgal lipids can be economically converted to conventional fuels. It was determined that fuels from microalgal lipids presented better options than converting the microalgal biomass to either alcohols or methane. All lipids can potentially be catalytically converted to gasoline, or the fatty acids can be converted to substitute diesel fuels. The Southwest has the necessary low, flat, underutilized lands, and carbon dioxide is available from either natural deposits or flue gas from industrial plants. The amount of saline water available will probably determine how much fuel can be produced from aquatic species, and this question should be answered during 1985. The largest constraint of this technology is the economical production of an oil-rich microalgal feedstock. The agenda for the review was divided into four sections: species selection and characterization, applied physiological studies, outdoor mass cultivation, and systems design and analysis. Papers from these presentations are included in these proceedings. Program advances were reported in the areas of species collection and selection, modulated light physiology, mass culture yields, harvesting of microalgae, mass culture facility design and analysis, and assessments on fuel options from microalgae. Separate abstracts have been prepared for each paper for inclusion in the Energy Data Base.

  10. Nuclear heating - a review of projects in several countries

    International Nuclear Information System (INIS)

    Vymetal, L.

    1980-01-01

    A review is presented of projects and studies of nuclear heat generation and district heating in the USSR, France, Sweden, Finland, USA, FRG, and CSSR. Attention is primarily paid to the nuclear sources, i.e., nuclear power and heating plants and special reactors for nuclear heating plants. The questions of heat transmission and costs are also dealt with. The review is based on the literature published between 1976 and 1979. An important source were materials from the conference on the use of low-potential heat from nuclear reactors held in Otaniemi (Finland) in 1977. (author)

  11. Critical Success Factors for Malaysian Construction Projects: An Investigative Review

    Directory of Open Access Journals (Sweden)

    Yee Cheong Yong

    2017-05-01

    Full Text Available Construction projects play an important role in the advancement of a nation through infrastructure development that leads to economic growth. They are planned carefully to accomplish certain goals. However, not all the projects achieved the goals as per planned. Many factors contribute to the successes and failures, and it becomes an interesting arena for research. The primary objective of this paper is to outline the development trend of project success measurement globally and locally. The research method employed was to make selected reviews on critical success factors' (CSFs literature and to compare international standards and progress in incorporating human behavioural aspects of project management to the situation in Malaysia. A somewhat similar pattern can be observed in Malaysia where the studies have departed from the usual criteria of time, cost and quality, to define project success in a more holistic way. However, the domestic industry has failed to respond to the emerging trend globally as there has yet been any widely published research on the importance of human-related factors towards project success. A consolidated framework of CSFs has therefore, been proposed in responding to the findings. This paper fulfils an identified need as there has been a dearth of research on the subject matter locally.

  12. Project for review of nuclear energy in the Netherlands

    International Nuclear Information System (INIS)

    Jong, J.J. de

    1988-03-01

    In consequence of the accident national as well as international activities have been undertaken, in particular in the areas of reactor safety and environmental impacts. The international activities were concentrated at IAEA in Vienna, NEA in Paris and the EG. Nationally regarded the accident has induced the project Review and the working plan for rounding-off Chernobylsk. In general it could be noted that one has learned lessons from the accident in the areas of reactor safety and environmental impacts. 22 refs

  13. 76 FR 29770 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2011-05-23

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Center for Scientific Review... public in accordance with the provisions set forth in sections 552b(c)(4) and 552b(c)(6), Title 5 U.S.C...: Center for Scientific Review Special Emphasis Panel; Program Project: Regulation of Mammalian Meiosis...

  14. Collaborative International Evaluated Library Organisation Pilot Project. CIELO meeting, NEA Headquarters, 18-20 May 2015

    International Nuclear Information System (INIS)

    Mattoon, Caleb; Brown, David; Trkov, Andrej; Plompen, Arjan; Hawari, Ayman I.; Roubtsov, Danila; Kim, Do Heon; Bauge, Eric; Palmiotti, Giuseppe; Kessedjian, Gregoire; Conlin, Jeremy Lloyd; Qian, Jing; Leal, Luiz Carlos; Chadwick, Mark; Herman, Michal Wladyslaw; White, Morgan C.; Cabellos, Oscar; Romain, Pascal; Schillebeeckx, Peter; Ichou, Raphaelle; Jacqmin, Robert; Hilaire, Stephane; Danon, Yaron; Ge, Zhigang; Malvagi, Fausto; Kahler, Albert C. Skip; Morillon, Benjamin; Mcnabb, Dennis P.; Oleynik, Dmitry S.; Wu, Haicheng; Marquez Damian, Jose Ignacio; Yokoyama, Kenji; Dunn, Michael; Cho, Young-Sik; Pignet, Sophie; Ignatyuk, Anatoly V.; Leeb, Helmut; Wang, Wenming; Ruan, Xichao

    2015-05-01

    WPEC subgroup 40-CIELO (Collaborative International Evaluated Library Organization) provides a new working paradigm to facilitate evaluated nuclear reaction data advances. It brings together experts from across the international nuclear reaction data community to identify and document discrepancies among existing evaluated data libraries, measured data, and model calculation interpretations, and aims to make progress in reconciling these discrepancies to create more accurate ENDF-formatted files. SG40-CIELO focusses on 6 important isotopes: "1H, "1"6O, "5"6Fe, "2"3"5","2"3"8U, "2"3"9Pu. This document is the proceedings of the CIELO meeting, held at the NEA Headquarters on 18-20 May 2015. It comprises all the available presentations (slides) given by the participants: A - CIELO project: - 1: Status of Cross Section Progress (M. Chadwick); - 2: Update on CIELO Related Measurements at RPI (Y. Danon); - 3: IAEA-NDS and the CIELO Project (A. Trkov); - 4: LANL Criticality Data Testing using CIELO Candidate Evaluations (S. Kahler); - 5: ENDF/B-VII.1 vs. CIELO (R. Cullen); B - O"1"6: - 6: n+"1"6O (A. Plompen); - 7: Resonance Evaluations for "1"6O for the CIELO Project (L. Leal); - 8: Validation of Leal and Hale O-16 Evaluations against FNS/JAEA Liquid Oxygen ToF Benchmark (I. Kodeli); - 9: Cierjacks 1968, Cierjacks 1980 and RPI 2015 (C.R. Lubitz); - 10: O"1"6 Items (C.R. Lubitz); C - Fe"5"6: - 11: Iron in fast neutron range, beta-0 evaluation for "5"6Fe (M. Herman); - 12: Data Evaluation at ORNL (L. Leal); - 13: IAEA-NDS and the CIELO Project Fe-56 (A. Trkov); - 14: The evaluation of experimental data in fast range for "5"6Fe (Z. Ge); D - H1 - 15: Reactivity effect of New Light and Heavy Water TSL on Critical Systems (J.I. Marquez); E - Big3: - 16: Resonance Evaluations of "2"3"5U for the CIELO Project (L. Leal); - 17: IAEA-NDS and the CIELO Project U-235 (A. Trkov); - 18: Status of "2"3"5U CIELO evaluation (B. Morillon); - 19: U"2"3"5 Items (C.R. Lubitz); - 20: Fission

  15. Effects of the Meetings-Flow Approach on Quality Teamwork in the Training of Software Capstone Projects

    Science.gov (United States)

    Chen, Chung-Yang; Hong, Ya-Chun; Chen, Pei-Chi

    2014-01-01

    Software development relies heavily on teamwork; determining how to streamline this collaborative development is an essential training subject in computer and software engineering education. A team process known as the meetings-flow (MF) approach has recently been introduced in software capstone projects in engineering programs at various…

  16. Setting Ambitious yet Achievable Targets Using Probabilistic Projections: Meeting Demand for Family Planning.

    Science.gov (United States)

    Kantorová, Vladimíra; New, Jin Rou; Biddlecom, Ann; Alkema, Leontine

    2017-09-01

    In 2015, governments adopted 17 internationally agreed goals to ensure progress and well-being in the economic, social, and environmental dimensions of sustainable development. These new goals present a challenge for countries to set empirical targets that are ambitious yet achievable and that can account for different starting points and rates of progress. We used probabilistic projections of family planning indicators, based on a global data set and Bayesian hierarchical modeling, to generate illustrative targets at the country level. Targets were defined as the percentage of demand for family planning satisfied with modern contraceptive methods where a country has at least a 10 percent chance of reaching the target by 2030. National targets for 2030 ranged from below 50 percent of demand satisfied with modern contraceptives (for three countries in Africa) to above 90 percent (for 41 countries from all major areas of the world). The probabilistic approach also identified countries for which a global fixed target value of 75 percent demand satisfied was either unambitious or has little chance of achievement. We present the web-based Family Planning Estimation Tool (FPET) enabling national decision makers to compute and assess targets for meeting family planning demand. © 2017 The Population Council, Inc.

  17. Comments of the PRA Senior Review Panel on the meeting held December 1--3, 1987

    International Nuclear Information System (INIS)

    Sharp, D.A.

    1988-01-01

    This memorandum records the minutes of the PRA Senior Review Panel meeting held at Savannah River Laboratory (SRL) on December 1--3, 1987, and the report on that meeting written subsequently by the panel members. The minutes are contained as Attachment 2 of this memorandum, and the report as Attachment 1. The Panel indicated two principal concerns in their report: (1) that insufficient emphasis is being placed on the reliability data development program, and (2) that excessive detail is being built into the fault trees. These concerns have been addressed in a subsequent meeting with the Panel, held March 2--4, 1988. In addition, the members have been provided with a program document (Reference 1) indicating the extent, the timing, and the limitations of the data analysis effort for the PRA

  18. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  19. Auditory hallucinations: A review of the ERC "VOICE" project.

    Science.gov (United States)

    Hugdahl, Kenneth

    2015-06-22

    In this invited review I provide a selective overview of recent research on brain mechanisms and cognitive processes involved in auditory hallucinations. The review is focused on research carried out in the "VOICE" ERC Advanced Grant Project, funded by the European Research Council, but I also review and discuss the literature in general. Auditory hallucinations are suggested to be perceptual phenomena, with a neuronal origin in the speech perception areas in the temporal lobe. The phenomenology of auditory hallucinations is conceptualized along three domains, or dimensions; a perceptual dimension, experienced as someone speaking to the patient; a cognitive dimension, experienced as an inability to inhibit, or ignore the voices, and an emotional dimension, experienced as the "voices" having primarily a negative, or sinister, emotional tone. I will review cognitive, imaging, and neurochemistry data related to these dimensions, primarily the first two. The reviewed data are summarized in a model that sees auditory hallucinations as initiated from temporal lobe neuronal hyper-activation that draws attentional focus inward, and which is not inhibited due to frontal lobe hypo-activation. It is further suggested that this is maintained through abnormal glutamate and possibly gamma-amino-butyric-acid transmitter mediation, which could point towards new pathways for pharmacological treatment. A final section discusses new methods of acquiring quantitative data on the phenomenology and subjective experience of auditory hallucination that goes beyond standard interview questionnaires, by suggesting an iPhone/iPod app.

  20. EC6 design features and pre-project licensing review

    Energy Technology Data Exchange (ETDEWEB)

    Yu, S.; Lee, A.G.; Dinh, N.B.; Soulard, M. [CANDU Energy Inc., Mississauga, Ontario, (Canada)

    2013-07-01

    The Enhanced CANDU 6 (EC6) is the new Generation III CANDU reactor design that meets the most up to date Canadian regulatory requirements and customer expectations. Candu Energy Inc. is finalizing development of the EC6 which incorporates the CANDU 6's well-proven features, and adds enhancements that strengthened reactor safety margin and improved operability. The EC6 builds on the proven high performance design and the defence-in-depth features of CANDU 6 units, and has incorporated extensive operational feedback including lessons learned from Fukushima. This paper will provide status of the engineering program including progress on the pre-licensing review of the EC6 design by the Canadian Regulator, CNSC, and will also highlight the design and safety enhancements incorporated in the EC6 product. Safety enhancements to meet safety goals and to improve robustness of systems to respond to design basis accidents and beyond design basis accidents include: new severe accident recovery and heat removal system; improved emergency heat removal system; faster shutoff rods with improved safety margins; mechanical guaranteed shutdown rods; daily load cycling capability; robust containment with containment filter venting system; and improved backed-up electrical supply and cooling services. (author)

  1. End user orientation of TC projects. Special evaluation review

    International Nuclear Information System (INIS)

    1996-12-01

    The present review of the end use orientation of TC projects was undertaken as requested by the TC Department to identify: (a) end users and beneficiaries beyond the boundaries of the counterpart laboratories, as appropriate; (b) means provided or planned to reach the end users and beneficiaries; (c) performance indicators in quantifiable terms, including those related to the counterpart activities that could be foreseen during and after completion of Agency assistance; and (d) recommendations of additional means, if necessary, to reach the end users and beneficiaries. A total of 13 TC projects with large budgets of around $200,000 and above were selected from those first approved under the 1995-1996 biennial programme and supported under the TCF, representing diverse fields of Agency activities and covering all the geographical areas of the Agency's technical co-operation. The projects thus selected were one each from Argentina, Bolivia, Bulgaria, Chile, Colombia, Egypt, Ethiopia, Jordan, Mexico, Mongolia, Slovenia, Turkey and Viet-Nam. The overall budget of the 13 projects as originally approved for 1995 to 1998, amounted to $5,510,980. The current budget as of 8 November 1996 stands at $5,446,719, representing a decrease of more than one percent. Figs, tabs

  2. A desk evaluation review of project BGD/5/010 food irradiation. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-03-26

    To increase the availability of food, the Bangladesh Atomic Energy Commission (BAEC), through its institute of Food and Radiation Biology (IFRB), has for many years pursued research studies in the use of ionizing radiation for food disinfestation and preservation. The Agency has been assisting these research efforts since the late 1970s. Project BGD/5/010, Food Irradiation, as reformulated in 1984, was to take on-going activities ones step further, with the main objective of demonstrating on a semi-commercial scale the efficacy and profitability of food irradiation in reducing the high storage losses of economically important food, such as potatoes, onions, dried fish and other seafood. A further objective was the transfer of food irradiation technology to the relevant industries in Bangladesh. The total budget of the project for the years 1983 through 1992 includes 5.1 man-months of expert services, $1,064,634 for equipment and $29,200 for training. The review was undertaken upon request by the Asia and the Pacific Section, to assess the current status of this ten-year project, which has encountered numerous delays and set-backs and is now nearing completion, and to determine to what extent the experience gained on the project could be useful in the implementation of similar on-going and future projects.

  3. A desk evaluation review of project BGD/5/010 food irradiation. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    To increase the availability of food, the Bangladesh Atomic Energy Commission (BAEC), through its institute of Food and Radiation Biology (IFRB), has for many years pursued research studies in the use of ionizing radiation for food disinfestation and preservation. The Agency has been assisting these research efforts since the late 1970s. Project BGD/5/010, Food Irradiation, as reformulated in 1984, was to take on-going activities ones step further, with the main objective of demonstrating on a semi-commercial scale the efficacy and profitability of food irradiation in reducing the high storage losses of economically important food, such as potatoes, onions, dried fish and other seafood. A further objective was the transfer of food irradiation technology to the relevant industries in Bangladesh. The total budget of the project for the years 1983 through 1992 includes 5.1 man-months of expert services, $1,064,634 for equipment and $29,200 for training. The review was undertaken upon request by the Asia and the Pacific Section, to assess the current status of this ten-year project, which has encountered numerous delays and set-backs and is now nearing completion, and to determine to what extent the experience gained on the project could be useful in the implementation of similar on-going and future projects

  4. Topics raised by the summary report of the first review meeting

    International Nuclear Information System (INIS)

    2001-01-01

    This document presents the fulfilling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 7 of the document contains topics raised by the summary report of the first review meeting. The chapter covers status and position of the regulatory body, collective doses, effluents release trends, adoption of the ICRP 60 and basic safety standards, regulatory strategy, quality assurance, monitoring safety management, international cooperation, probabilistic safety assessment and safety improvement programmes

  5. [Nuclear energy and environment: review of the IAEA environmental projects].

    Science.gov (United States)

    Fesenko, S; Fogt, G

    2012-01-01

    The review of the environmental projects of the International Atomic Energy Agency is presented. Basic IAEA documents intended to protect humans and the Environment are considered and their main features are discussed. Some challenging issues in the area of protection of the Environment and man, including the impact of nuclear facilities on the environment, radioactive waste management, and remediation of the areas affected by radiological accidents, nuclear testing and sites of nuclear facilities are also discussed. The need to maintain the existing knowledge in radioecology and protection of the environment is emphasised.

  6. The development of biodiversity conservation measures in China's hydro projects: A review.

    Science.gov (United States)

    Bai, Ruiqiao; Liu, Xuehua; Liu, Xiaofei; Liu, Lanmei; Wang, Jianping; Liao, Sihui; Zhu, Annah; Li, Zhouyuan

    2017-11-01

    The hydropower capacity of China ranks first in the world and accounts for approximately 20% of the total energy production in the country. While hydropower has substantially contributed to meeting China's renewable energy targets and providing clean energy to rural areas, the development of hydropower in China has been met with significant controversy. Ecologically, hydro projects alter the landscape, with potential impacts to the country's aquatic biodiversity. Over the past four decades in China, various mainstream opinions and misunderstandings have been presented concerning how to alleviate the negative impacts of hydro projects on aquatic ecosystems. This article reviews research concerning potential mitigation measures to enhance aquatic biodiversity conservation in hydro projects in China. Based on the academic attention such research has attracted, three technical measures for aquatic biodiversity conservation are considered: (1) fish passages, (2) restocking efforts and (3) river and lake renovations. This article provides a historical comparison of these three practices in China to demonstrate the advantages and disadvantages of each method. The article also reviews the relevant legislation, regulations and technical guidelines concerning China's hydro projects dating back to 1979. The dynamics in research, publications, and patents concerning these three mitigation measures are summarized to demonstrate their technological developments in the context of legislative and policy advances. Data were gathered through the China Knowledge Resource Integrated Database and the State Intellectual Property Office of the People's Republic of China. Based on the analysis provided, the article recommends an expansion of China's environmental certification system for hydro projects, more robust regional legislation to bolster the national framework, the cooperation between upstream and downstream conservation mechanisms, and better monitoring to determine the efficacy

  7. 7 CFR 1486.506 - When will a project be reviewed?

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false When will a project be reviewed? 1486.506 Section... Reporting, Evaluation, and Compliance § 1486.506 When will a project be reviewed? Any project or activity... after the completion of the project. ...

  8. Nuclear emergency planning in Spain. The PLABEN review project

    International Nuclear Information System (INIS)

    Lentijo Lentijo, J. C.; Vila Pena, M.

    2002-01-01

    The international rules and recommendations for nuclear emergency planning and the Spanish experience gained in the management of event with radiological risk have noticed that is necessary to review the planning radiological bases for emergencies in nuclear power plants and to define the planning radiological bases for radiological emergencies that could happen in radioactive facilities or in activities out of the regulatory framework. The paper focuses on CSN actions concerning the Plaben review project related to define the new radiological principles taking into account the current international recommendations for interventions, make a proposal about the organisation and operation of the provincial radiological action group and the national support level for radiological emergency response. (Author) 7 refs

  9. A Formula for Fixing Troubled Projects: The Scientific Method Meets Leadership

    Science.gov (United States)

    Wagner, Sandra

    2006-01-01

    This presentation focuses on project management, specifically addressing project issues using the scientific method of problem-solving. Two sample projects where this methodology has been applied are provided.

  10. Design iteration in construction projectsReview and directions

    Directory of Open Access Journals (Sweden)

    Purva Mujumdar

    2018-03-01

    Full Text Available Design phase of any construction project involves several designers who exchange information with each other most often in an unstructured manner throughout the design phase. When these information exchanges happen to occur in cycles/loops, it is termed as design iteration. Iteration is an inherent and unavoidable aspect of any design phase which requires proper planning. Till date, very few researchers have explored the design iteration (“complexity” in construction sector. Hence, the objective of this paper was to document and review the complexities of iteration during design phase of construction projects for efficient design planning. To achieve this objective, exhaustive literature review on design iteration was done for four sectors – construction, manufacturing, aerospace, and software development. In addition, semi-structured interviews and discussions were done with a few design experts to verify the different dimensions of iteration. Finally, a design iteration framework was presented in this study that facilitates successful planning. Keywords: Design iteration, Types of iteration, Causes and impact of iteration, Models of iteration, Execution strategies of iteration

  11. Second review meeting of the Contracting Parties to the Convention on Nuclear Safety

    International Nuclear Information System (INIS)

    Rafferty, Barbara

    2002-01-01

    The Second Review Meeting of the Contracting Parties to the Convention on Nuclear Safety was held in the Headquarters of the International Atomic Energy Agency in Vienna from 15-26 April 2002, under the chairmanship of the President, Mr Miroslav Gregoric, Director of the Slovenian Nuclear Safety Authority. The Convention on Nuclear Safety entered into force in October 1996, has been signed by sixty-five States and ratified by fifty-four, bringing within its scope 428 of the 448 nuclear reactors worldwide. The Convention aims to achieve and maintain a high level of nuclear safety worldwide, through inter alia enhancement of national measures and international co-operation. Obligations on Contracting Parties in accordance with the Convention include: the establishment and maintenance of a legislative and regulatory framework to govern the safety of land-based civil nuclear installations; the allocation of adequate financial and human resources to support the safety objectives; ensuring that all reasonably practicable improvements to safety are made as a matter of urgency. Adherence to this Convention entails two basic commitments by each Contracting Party: to prepare and make available a national report for review; and to subject its national report to a peer review by the other Contracting Parties. Thus, being a Contracting Party to this Convention involves: including in the national report a self-assessment of steps and measures already taken and in progress to implement the Convention obligations; taking an active part in an open and transparent review of its national report and the Reports of other Contracting Parties; and a commitment to a continuous learning and improving process, something which is a key element of a strong safety culture. The peer review of national reports takes place every three years, the first having been held in 1999. The Second Review Meeting was attended by delegates from 46 contracting parties. During the review certain issues were

  12. Proceedings of the European Review Meeting on Severe Accident Research - ERMSAR 2005

    International Nuclear Information System (INIS)

    2005-01-01

    conferences (European Review Meeting on Severe Accident Research) contain detailed information o n the topics of the SARNET project. This document is the proceedings of the first ERMSAR conference hosted by IRSN in Aix-en-Provence (France) in November 2005. It gathers all available presentations and full papers

  13. NEDO information dissemination subcommittee. 18th project report meeting; NEDO joho fukyu bunkakai. Dai 18 kai jigyo hokokukai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    Explained in detail in a report on NEDO (New Energy and Industrial Technology Development Organization) information center activities is the exchange of information, which is accomplished through IEA (International Energy Agency) Energy Technology Data Exchange (ETDE) implementing agreement; IEA Coal Research implementing agreement; Center for the Analysis and Dissemination of Demonstrated Energy Technologies (CADDET); and IEA Greenhouse Gas Technology Information Exchange (GREENTIE). Described in relation with information dissemination activities are the opening to the public of NEDO achievement reports, NEDO Energy Database System (NEDO-EDBS), management of the library and data room, information available at Internet web sites, and so forth. Other project reports presented at the meeting include a survey of new energy actualities, publication of dedicated information journals, and so forth. At the second session of the project report meeting, a lecture is delivered, entitled Network Age and Information Distribution Revolution. (NEDO)

  14. Private sector malaria RDT initiative in Nigeria: lessons from an end-of-project stakeholder engagement meeting.

    Science.gov (United States)

    Odugbemi, Babatunde; Ezeudu, Chijioke; Ekanem, Anyiekere; Kolawole, Maxwell; Akanmu, Idowu; Olawole, Aderemi; Nglass, Nkabono; Nze, Chinwe; Idenu, Edward; Audu, Bala Mohammed; Ntadom, Godwin; Alemu, Wondimagegnehu; Mpazanje, Rex; Cunningham, Jane; Akubue, Augustine; Arowolo, Tolu; Babatunde, Seye

    2018-02-06

    The malaria rapid diagnosis testing (RDT) landscape is rapidly evolving in health care delivery in Nigeria with many stakeholders playing or having potential for critical roles. A recent UNITAID grant supported a pilot project on the deployment of quality-assured RDTs among formal and informal private service outlets in three states in Nigeria. This paper describes findings from a series of stakeholder engagement meetings held at the conclusion of the project. The agreed meeting structure was a combination of plenary presentations, structured facilitated discussions, and nominal group techniques to achieve consensus. Rapporteurs recorded the meeting proceeding and summaries of the major areas of discussion and consensus points through a retrospective thematic analysis of the submitted meeting reports. Key findings indicate that private providers were confident in the use of RDTs for malaria diagnosis and believed it has improved the quality of their services. However, concerns were raised about continued access to quality-assured RDT kits. Going forward, stakeholders recommended increasing client-driven demand, and continuous training and supervision of providers through integration with existing monitoring and supervision mechanisms.

  15. Decommissioning project readiness reviews at the Department of Energy's Hanford, Washington, Site

    International Nuclear Information System (INIS)

    Speer, D.R.; Holmes, P.A.

    1987-01-01

    Two Hanford Site contractors independently formulated readiness review methods to prepare for decontamination and decommissioning (D and D) projects. One readiness review method provided an independent management review process. The other method provided a review by personnel directly involved in the project and concise documentation procedures. A unified system is now used at Hanford which combines the best aspects of both readiness review methods. The unified method assigns category levels based on certain job characteristics. The category assigned to the project then indicates the required level of management review prior to proceeding with the D and D project. In addition, the concise documentation procedures are now used for all category levels

  16. NEDO business outline for fiscal 1997. 18th project report meeting; 1997 nendo gyomu gaiyo. Dai 18 kai jigyo hokokukai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-22

    The projects of NEDO (New Energy and Industrial Technology Development Organization) are stated as reported at the 18th project report meeting. Outlined are new energy-related projects involving technology development, resources exploitation, promotion of new energy introduction, promotion of international cooperation, gathering of information, and so on. Outlined in relation to the research and development of industrial technologies are projects on research and development, development of medical and welfare equipment, research and development of global environment-related industrial technology, development of international industrial technology, and improvement on platforms for researches. Concerning coal, subsidy-granted projects on domestic coal and projects on domestic coal mine improvement are outlined. Projects relating to compensation for environmental pollution resulting from coal mining and those relating to alcohol production are also outlined. NEDO's financial statement for fiscal 1997 is reported. Also reported are budgets for fiscal 1998 for projects relating to new energy, research and development of industrial technology, coal mining structure coordination, compensation for environmental pollution resulting from coal mining, and alcohol production. (NEDO)

  17. NEDO business outline for fiscal 1997. 18th project report meeting; 1997 nendo gyomu gaiyo. Dai 18 kai jigyo hokokukai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-22

    The projects of NEDO (New Energy and Industrial Technology Development Organization) are stated as reported at the 18th project report meeting. Outlined are new energy-related projects involving technology development, resources exploitation, promotion of new energy introduction, promotion of international cooperation, gathering of information, and so on. Outlined in relation to the research and development of industrial technologies are projects on research and development, development of medical and welfare equipment, research and development of global environment-related industrial technology, development of international industrial technology, and improvement on platforms for researches. Concerning coal, subsidy-granted projects on domestic coal and projects on domestic coal mine improvement are outlined. Projects relating to compensation for environmental pollution resulting from coal mining and those relating to alcohol production are also outlined. NEDO's financial statement for fiscal 1997 is reported. Also reported are budgets for fiscal 1998 for projects relating to new energy, research and development of industrial technology, coal mining structure coordination, compensation for environmental pollution resulting from coal mining, and alcohol production. (NEDO)

  18. 78 FR 16657 - Fisheries of the South Atlantic; Southeast Data, Assessment, and Review (SEDAR); Public Meetings

    Science.gov (United States)

    2013-03-18

    ... the status of the stock, estimates biological benchmarks, projects future population conditions, and... and gray triggerfish. SUMMARY: The SEDAR 32 assessments of the South Atlantic stocks of blueline... Review (SEDAR) process, a multi-step method for determining the status of fish stocks in the Southeast...

  19. 78 FR 31951 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-05-28

    ... Emphasis Panel; Fellowships: Genes, Genomes and Genetics. Date: June 24, 2013. Time: 10:00 a.m. to 7:00 p.m... personal privacy. Name of Committee: Center for Scientific Review Special Emphasis Panel; Program Project...; Small Business: Education, Psychology, and Biology in Health Behavior. Date: June 24-25, 2013. Time: 8...

  20. Report of a consultants meeting on the review of Bubbler condenser structural integrity calculations

    International Nuclear Information System (INIS)

    Andrieu, R.; Balaz, P.; Kucera, V.; Kudriashov, A.N.; Orden, A.; Strupczewski, A.; Timoshenko, V.

    1995-01-01

    The participants of the meeting on peer review were the experts who have already made their own strength calculations for WWER 440/213 bubbler condenser structures or who had experience in strength calculations of similar structures. The list of participants is given in Appendix 1. The results have confirmed that the weak points indicated in previous calculations should be strengthened. Some suggestions were given concerning possible ways of strengthening the bubbler condenser structure. However, as the required work is extensive, and the conditions of its realization are difficult, it was recommended to conduct site specific reviews of the actual situation in bubbler condenser structure in each plant before any final recommendations can be formulated. The results of this peer review are presented. 10 refs, figs, tab

  1. Summary of geologic review group meetings, March 17--18, 1977 and May 26--27, 1977

    International Nuclear Information System (INIS)

    Frye, J.C.; Crawford, J.H.; Davis, S.N.; Donath, F.A.; Gloyna, E.F.; Krauskopf, K.B.

    1977-01-01

    As a result of these meetings, the Geologic Review Group made suggestions and recommendations on radioactive waste repository sites, covering priorities for needed data on rock types, retrievable storage, use of Nevada Test Site, non-salt rock types, etc

  2. Proceedings of the Second Fusion-Fission Energy Systems Review Meeting

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-11-02

    The agenda of the meeting was developed to address, in turn, the following major areas: specific problem areas in nuclear energy systems for application of fusion-fission concepts; current and proposed fusion-fission programs in response to the identified problem areas; target costs and projected benefits associated with fusion-fission energy systems; and technical problems associated with the development of fusion-fission concepts. The greatest emphasis was placed on the characteristics of and problems, associated with fuel producing fusion-fission hybrid reactors.

  3. 77 FR 42482 - Reports and Updates on Arctic Research Programs and Projects; Meetings

    Science.gov (United States)

    2012-07-19

    ..., filing of petitions and applications and agency #0;statements of organization and functions are examples... needs in advance of the meeting. Contact person for further information: John Farrell, Executive...

  4. 77 FR 68102 - Programs and Research Projects Affecting the Arctic; 99th Meeting

    Science.gov (United States)

    2012-11-15

    ...;and investigations, committee meetings, agency decisions and rulings, #0;delegations of authority... planning to attend who requires special accessibility features and/or auxiliary aids, such as sign language...

  5. Centers for Disease Control review panel's recommendations on health effects and epidemiological studies of operations at the Savannah River Plant, Aiken, South Carolina. Public comment and meeting report

    International Nuclear Information System (INIS)

    1985-05-01

    Based on the request of the US Department of Energy, the Centers for Disease Control of the US Department of Health and Human Services organized a panel to review the feasibility and usefulness of conducting further epidemiologic studies of delayed health effects around the Department of Energy's Savannah River Plant. The review and recommendations of the panel were documented in a report entitled Epidemiologic Projects Considered Possible to Undertake in Populations Around the Savannah River Plant. On November 30, 1984, the Department of Energy announced in the Federal Register (49 FR 47095) the conduct of a public meeting and a 30-day public comment period between December 1 and December 30, 1984, on the recommendations of the review panel. Based on the requests of individuals and representatives of organizations attending the December 18, 1984, public meetings, the Department of Energy subsequently announced in the Federal Register on December 31, 1984 (49 FR 50767) an extension of the public comment period to January 31, 1985. This report documents the public meeting and comment process, and provides responses to the public comments that were submitted during this process. In addition, this report contains the Department of Energy's position based on the recommendations of the Centers for Disease Control review panel and the public comments. 23 refs., 16 tabs

  6. 75 FR 69069 - Science Advisory Board Staff Office Notification of a Public Meeting of the SAB Lead Review Panel

    Science.gov (United States)

    2010-11-10

    ... Time) and December 7, 2010 from 8:30 a.m. to 12:30 p.m. (Eastern Time). ADDRESSES: The face-to-face... SAB Lead Review Panel will hold a public face-to-face meeting to peer review two draft EPA documents... an oral presentation at a public face-to-face meeting will be limited to five minutes, with no more...

  7. HHARP: The Historical Hospital Admission Records Project – a review

    Directory of Open Access Journals (Sweden)

    Cara Hirst

    2018-04-01

    Full Text Available Hospital records have frequently been used in epidemiological research (Kilgore et al. 2017; Rushton 2016, and in some cases palaeopathological research. However, the availability of data is problematic, with written records requiring considerable time to interpret, digitise and analyse. In 2001, the Historical Hospital Records Project (HHARP began digitising over 140,000 hospital admission records from four hospitals in London and Glasgow, providing researchers with an online data base of hospital records (Figure 1. I review the data available in the HHARP database, as well as make a preliminary analysis of the hospital records from London and Glasgow between c.1852-1921 which illustrates the value of the HHARP database in understanding disease and medical care during this period.

  8. Using fuzzy logic to improve the project time and cost estimation based on Project Evaluation and Review Technique (PERT

    Directory of Open Access Journals (Sweden)

    Farhad Habibi

    2018-09-01

    Full Text Available Among different factors, correct scheduling is one of the vital elements for project management success. There are several ways to schedule projects including the Critical Path Method (CPM and Program Evaluation and Review Technique (PERT. Due to problems in estimating dura-tions of activities, these methods cannot accurately and completely model actual projects. The use of fuzzy theory is a basic way to improve scheduling and deal with such problems. Fuzzy theory approximates project scheduling models to reality by taking into account uncertainties in decision parameters and expert experience and mental models. This paper provides a step-by-step approach for accurate estimation of time and cost of projects using the Project Evaluation and Review Technique (PERT and expert views as fuzzy numbers. The proposed method included several steps. In the first step, the necessary information for project time and cost is estimated using the Critical Path Method (CPM and the Project Evaluation and Review Technique (PERT. The second step considers the duration and cost of the project activities as the trapezoidal fuzzy numbers, and then, the time and cost of the project are recalculated. The duration and cost of activities are estimated using the questionnaires as well as weighing the expert opinions, averaging and defuzzification based on a step-by-step algorithm. The calculating procedures for evaluating these methods are applied in a real project; and the obtained results are explained.

  9. An Analysis Of The Benefits And Application Of Earned Value Management (EVM) Project Management Techniques For Dod Programs That Do Not Meet Dod Policy Thresholds

    Science.gov (United States)

    2017-12-01

    VALUE MANAGEMENT (EVM) PROJECT MANAGEMENT TECHNIQUES FOR DOD PROGRAMS THAT DO NOT MEET DOD POLICY THRESHOLDS December 2017 By: Randy Schneider...Joint applied project 4. TITLE AND SUBTITLE AN ANALYSIS OF THE BENEFITS AND APPLICATION OF EARNED VALUE MANAGEMENT (EVM) PROJECT MANAGEMENT ...performance reporting. The immediate objective of this research project was to examine the question: Can the application of EVM-Lite project management

  10. 75 FR 4140 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-01-26

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION... Tax Credit Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public... Advocacy Panel Earned Income Tax Credit Project Committee will be held Wednesday, February 24, 2010, at 1 p...

  11. Project Management Meets Change Management - A Success Story. Focus Area: Tech Perspectives TI012SN

    Science.gov (United States)

    Hall, Wayne

    2011-01-01

    Utilizing the concepts and terminology from Project Management, the process of planning and executing a Change Management (CM) Infrastructure improvement project is described. The primary audience for this presentation includes both experienced and relatively new CM administrators and their managers. It also includes anyone with an interest in the application of project management knowledge to CM administration. There are several benefits: the complexity of the CM tool technology is more manageable, CM administrators get to use project management knowledge to complete a project (not "firefighting"), improve relations with your customers (that means developers and managers), and get the opportunity to do it again.

  12. TWTF project criticality task force final review and assessment

    International Nuclear Information System (INIS)

    McKinley, K.B.; Cannon, J.W.; Wheeler, F.J.; Worle, H.A.

    1980-11-01

    The Transuranic Waste Treatment Facility (TWTF) is being developed to process transuranic waste, stored and buried at the Idaho National Engineering Laboratory, into a chemically inert, physically stable basalt-like residue acceptable at a federal repository. A task force was assembled by the TWTF Project Division to review and assess all aspects of criticality safety for the TWTF. This document presents the final review, assessments, and recommendations of this task force. The following conclusions were made: Additional criticality studies are needed for the entire envelope of feed compositions and temperature effects. Safe operating k/sub eff/'s need to be determined for process components. Criticality analyses validation experiments may also be required. SRP neutron interrogation should be replaced by DDT neutron interrogation. Accuracy studies need to be performed for the proposed assaying techniques. Time-correlated neutron monitoring needs to be mocked up for process components to prove feasibility and determine accuracy. The criticality control techniques developed for the TWTF conceptual design are in compliance with ERDAM 0530, including the Double Contingency Rule. Detailed procedures and controls need to be developed

  13. IAEA and EU Review Progress on Cooperation, Agree on Next Steps at Annual Meeting

    International Nuclear Information System (INIS)

    2018-01-01

    The International Atomic Energy Agency (IAEA) and the European Union (EU) reviewed progress achieved in working together on a range of nuclear activities and agreed to further enhance cooperation during their sixth annual Senior Officials Meeting in Vienna. The talks on 8 February at the IAEA’s headquarters provided a forum for exchanging views on strengthening collaboration on nuclear safety, security, safeguards, sustainable development, nuclear energy research and increasing innovation. The two organizations welcomed the fruitful cooperation and progress achieved over the past years. They agreed to deepen cooperation in several areas, particularly in the promotion of nuclear applications for sustainable development.

  14. Program and Proceedings: NCPV Program Review Meeting 2000, 16-19 April 2000, Denver, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    2000-04-01

    In entering the 21st century, we in industry and government who have labored to develop PV and bring it into the marketplace can be proud. World demand for PV is increasing faster than supply. The NCPV Program Review Meeting will a provide a forum for exploring how to implement strategies and recommendations for achieving critical goals and foster creative thinking on combining laboratory and industry talents to achieve the goals. The oral sessions focus on both strategic and tactical issues relating to the overall advance of the PV industry and the poster sessions provide an opportunity for more detailed discussions relating to particular tasks.

  15. First Meeting with Teachers and Principals of Unesco Associated Schools Project Held on Monday, 6 September 1982 at the Training Division, Prime Minister's Office, Castries, Saint Lucia.

    Science.gov (United States)

    International Understanding at School, 1982

    1982-01-01

    In September 1982, K-12 teachers and principals participating in Unesco's Associated Schools Project met to make preparations for the implementation of the project that was to commence when schools opened later that month. The project is intended to promote international understanding and peace. What happened at the meeting is described. (RM)

  16. Supporting the Creation and Publication of Reviewed and Tested Teaching Modules through the InTeGrate Project

    Science.gov (United States)

    Bruckner, M. Z.; Birnbaum, S. J.; Bralower, T. J.; Egger, A. E.; Fox, S.; Gosselin, D. C.; Iverson, E. A. R.; Manduca, C. A.; Mcconnell, D. A.; Steer, D. N.; Taber, J. J.

    2016-12-01

    InTeGrate is dedicated to providing robust curricular materials that increase Earth literacy among undergraduate students. As of August 2016, 14 modules that use an interdisciplinary approach to teach about Earth-related sustainability issues across the curriculum have been published, and 19 courses and modules are undergoing final revisions. Materials are designed for undergraduate courses and have been tested in a variety of disciplines including geoscience, engineering, humanities, ethics, and Spanish language courses. The materials were developed, tested, revised, and reviewed using a two-year, highly scaffolded process that involves meeting a series of checkpoints, and is supported by a team of experts who provide guidance and formative feedback throughout the process. A series of webinars also supported teams in the development process. Author teams comprise 3-6 faculty members from at least three different institutions. Authors work collaboratively in a templated webspace designed specifically for creating materials, and representatives from the InTeGrate leadership, assessment, and web teams support each group of authors. This support team provides guidance and feedback on content, pedagogy, and web layout as authors develop materials. Authors attend two face-to-face meetings, one at the beginning of the process and another after materials are piloted in authors' classes. These meetings serve to initially orient authors to the development process, including the rubric that will guide their work, and in making revisions following the piloting phase of the project. Authors report that the meetings also provide professional development experience wherein they learn about pedagogy from each other and team leaders. The bulk of the materials development occurs remotely, with teams meeting regularly via teleconference as they follow the project timeline. All materials undergo review against the Materials Design and Refinement Rubric to ensure they meet project

  17. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack

    1984-11-01

    This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.

  18. Status Review of Wildlife Mitigation at 14 of 27 Major Hydroelectric Projects in Idaho, 1983-1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Martin, Robert C.; Mehrhoff, L.A.

    1985-01-01

    The Pacific Northwest Electric Power Planning and Conservation Act and wildlife and their habitats in the Columbia River Basin and to compliance with the Program, the wildlife mitigation status reports coordination with resource agencies and Indian Tribes. developed the Columbia River Basin Fish and Wildlife Program development, operation, and maintenance of hydroelectric projects on existing agreements; and past, current, and proposed wildlife factual review and documentation of existing information on wildlife meet the requirements of Measure 1004(b)(l) of the Program. The mitigation, enhancement, and protection activities were considered. In mitigate for the losses to those resources resulting from the purpose of these wildlife mitigation status reports is to provide a resources at some of the Columbia River Basin hydroelectric projects the river and its tributaries. To accomplish this goal, the Council were written with the cooperation of project operators, and in within Idaho.

  19. Improved quality of patient care through routine second review of histopathology specimens prior to multidisciplinary meetings.

    Science.gov (United States)

    Kuijpers, Chantal C H J; Burger, Gerard; Al-Janabi, Shaimaa; Willems, Stefan M; van Diest, Paul J; Jiwa, Mehdi

    2016-10-01

    Double reading may be a valuable tool for improving quality of patient care by identifying diagnostic errors before final sign-out, but standard double reading would significantly increase costs of pathology. We assessed the added value of intradepartmental routine double reading of histopathology specimens prior to multidisciplinary meetings. Diagnoses, treatment plans and prognoses of patients are often discussed at multidisciplinary meetings. As part of the daily routine, all pathology specimens to be discussed at upcoming multidisciplinary meetings undergo prior intradepartmental double reading. We identified all histopathology specimens from 2013 that underwent such double reading and determined major and minor discordance rates based on clinical relevance between the initial and consensus sign-out diagnoses. We included 6796 histopathology specimens that underwent double reading, representing approximately 8% of all histopathology cases at our institution in 2013. Double reading diagnoses were concordant in 6566 specimens (96.6%). Major and minor discordances were observed in 60 (0.9%) and 170 (2.5%) specimens, respectively. Urology specimens had significantly more discordances than other tissues of origin, Gleason grading of prostate cancer biopsies being the most frequent diagnostic problem. Furthermore, premalignant and malignant cases showed significantly higher discordance rates than the rest. The vast majority (90%) of discordances represented changes within the same diagnostic category (eg, malignant to malignant). Routine double reading of histopathology specimens prior to multidisciplinary meetings prevents diagnostic errors. It resulted in about 1% discordant diagnoses of potential clinical significance, indicating that second review is worthwhile in terms of patient safety and quality of patient care. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  20. Meeting Ontario's electricity needs : a critical review of the Ontario Power Authority's supply mix advice report

    International Nuclear Information System (INIS)

    Gibbons, J.; Fracassi, J.

    2006-01-01

    In December, 2005 the Ontario Power Authority (OPA) outlined its proposed blueprint for meeting Ontario's electricity needs to 2025 in the document entitled Supply Mix Advice Report. As a result of the actions taken by the current government, the OPA believes that Ontario will have adequate electricity supplies to meet the province's needs until 2013. However, it stated that Ontario will require an additional 15,000 megawatts of new generation capacity between 2013 and 2025. The OPA also recommends that a significant proportion of this new generation capacity be nuclear. The Ontario Clean Air Alliance undertook a review of the OPA report and identified several discrepancies including an over-estimation of Ontario's rate of electricity load growth from 2005 to 2025; an under-estimation of the potential for electricity productivity improvements to reduce electricity demand and raise living standards; an under-estimation of renewable energy supply potential; an under-estimation of the potential for biomass and natural gas fired combined heat and power plants to meet electricity needs and increase the competitiveness of Ontario's industries; an under-estimation of the economic costs and risks of nuclear power; and a biased recommendation for a 70 million dollar resource acquisition budget against energy efficiency investments that would reduce demand and raise living standards. This report provides the Ontario Clean Air Alliances' analysis of the OPA report and presents it own recommendations for how Ontario can increase its electricity productivity and meet its electricity supply needs until 2025. The report concluded that the Government of Ontario should direct the OPA to develop a long-term strategy to raise the price of electricity up to its full cost without raising the electricity bills of low income consumers or impairing the competitiveness of Ontario's industries. It was suggested that Ontario's electricity productivity should be increased to the same level as

  1. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project FY17 Annual Review

    Science.gov (United States)

    Sakahara, Robert; Hackenberg, Davis; Johnson, William

    2017-01-01

    This presentation was presented to the Integrated Aviation Systems Program at the FY17 Annual Review of the UAS-NAS project. The presentation captures the overview of the work completed by the UAS-NAS project and its subprojects.

  2. UAS Integration in the NAS Project Test Site Kick-off Meeting

    Science.gov (United States)

    Kopardekar, Parimal; Witzberger, Kevin; Hackenberg, Davis L.; Murphy, Jim

    2015-01-01

    This briefing was presented during the Test Site Kick Off Meeting to discuss the contract awards for Task 1 and Task 2. This briefing covered a high level overview for contract deliverables, Task 1 - UAS Traffic Management and Task 2, Live Virtual Constructive Distributed Environment.

  3. Expert Meeting Report. Key Innovations for Adding Energy Efficiency to Maintenance Projects

    Energy Technology Data Exchange (ETDEWEB)

    Wood, A. [NAHB Research Center, Upper Marlboro, MD (United States); Wiehagen, J. [NAHB Research Center, Upper Marlboro, MD (United States)

    2012-09-01

    This report describes an expert meeting hosted by the Building America research team NAHB Research Center, which was held on February 8, 2012, in Orlando, Florida. The topic focused on efforts to increase the efficiency of existing homes, specifically for re-roofing and the opportunities for adding energy efficiency upgrades during this major home repair activity.

  4. Software development project success and failure from the supplier's perspective: A systematic literature review

    OpenAIRE

    Savolainen, Paula; Ahonen, Jarmo J.; Richardson, Ita

    2012-01-01

    peer-reviewed In this paper, we consider software development project success and failure from the supplier's perspective. First we clarified concepts in order to be able to exclude review articles on in-house projects, continuous services, the customer's perspective, and software product development, with the aim of providing valid results for supplier firms. We divided success criteria into project success and project management (PM) success, and, in seven articles, identified thre...

  5. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    Science.gov (United States)

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  6. When Commas Meet Kryptonite: Classroom Lessons from the Comic Book Project. Language and Literacy Series

    Science.gov (United States)

    Bitz, Michael

    2010-01-01

    This definitive book presents the newest research linking graphic narratives and literacy learning, as well as the tools teachers will need to make comic book projects a success in their classrooms. The Comic Book Project (www.comicbookproject.org) is an internationally celebrated initiative where children plan, write, design, and publish original…

  7. Office of Basic Energy Sciences program to meet high priority nuclear data needs of the Office of Fusion Energy: 1986 review

    International Nuclear Information System (INIS)

    Lane, R.O.

    1986-09-01

    A coordination meeting of the program was held at Argonne National Laboratory on September 17-19, 1986. Representatives from the participating laboratories and from the fusion technology community met to discuss nuclear data needs for fusion. Most of the standing nuclear data requests for fusion were discussed in considerable detail, and the status of the relevant data was reviewed. Task force groups were organized along disciplinary lines to address many of the issues which confront the program. Plans were laid for several collaborative endeavors, including technical projects to address specific data problems and an intercomparison of methods and codes in the area of nuclear modeling

  8. Fuel transfer system ALARA design review - Project A.15

    International Nuclear Information System (INIS)

    KUEBERTH, L.R.

    2001-01-01

    One mission of the Spent Nuclear Fuel (SNF) Project is to move the SNF from the K Basins in the Hanford 100K Area to an interim dry storage at the Canister Storage Building (CSB) in the Hanford 200 East Area. The Fuel Transfer System (FTS) is a subproject that will move the SNF from the 105K East (KE) Facility to the 105K West (KW) Facility. The SNF will be treated for shipment to the Cold Vacuum Drying (CVD) facility at the KW Basin. The SNF canisters will be loaded underwater into a Shielded Transfer Cask (STC) in the KE Basin. The fully loaded STC will be brought out of the water and placed into a Cask Transfer Overpack (CTO) by the STC Straddle Carrier. As the STC is removed from the water, it will be washed down with demineralized water by an manual rinse system. The CTO with the STC inside will be placed on a transport trailer and transferred to the KW Basin as an intra-facility transfer. The CTO will be unloaded from the shipping trailer at the KW Basin and the STC will be removed from the CTO. The STC will then be lowered into the KW Basin water and the fuel will be removed. The SNF will then be processed for shipment to the CVD. As soon as all of the fuel has been removed from the STC, the cask will be removed from the KW Basin water and placed into the CTO. The CTO will again be placed on the trailer for transport back to the KE Basin where the entire cycle will be repeated approximately 400 times. This document records the As Low As Reasonably Achievable (ALARA) findings and design recommendations/requirements by the SNF Project noted during the Final Design Review of the STC, CTO, STC Transfer System, Annexes and Roadways for support of FTS. This document is structured so that all statements that include the word ''shall'' represent design features that have been or will be implemented within the project scope. Statements that include the words ''should'' or ''recommend'' represent ALARA design features to be evaluated for future implementation

  9. Summary Record of the Fourth Meeting of Records, Knowledge and Memory (RK and M) Across Generations Project

    International Nuclear Information System (INIS)

    2013-01-01

    Preservation of Records, Knowledge and Memory (RK and M) across Generations is an initiative under the RWMC in the area of knowledge consolidation and transfer. Disposal in engineered facilities built in stable, deep geological formations is the reference means for permanently isolating long-lived radioactive waste from the biosphere. However, there is no intention to forgo, at any time, knowledge and awareness either of the repository or of the waste that it contains. The cultural dimension of preserving RK and M is an important subject. Overall, long-term preservation of RK and M is a multidisciplinary work area in which much learning is expected over the coming years. This is the task of the RWMC's RK and M initiative. A major outcome will be a menu-driven document that - the RK and M Wiki - that will allow people to identify the elements of a strategic action plan for RK and M preservation. This document is a summary record of the 4. Meeting of the RK and M project. Three appendices are attached to the summary: - A: Agreed changes to the key observations of the September 2012 Workshop Proceedings; - B: Summary of the discussion and action points regarding the development of the MDD Wiki; - C: Decisions and Actions. The list of participants is also attached to the end of the document. The summary is made of 32 items: 1: Progress Report (Claudio Pescatore); 2: September 2012 Workshop Proceedings (Claudio Pescatore); 3: Glossary and Bibliography Update (Anne Claudel); 4: UNESCO Digital Conference Report and Work with CoData (Claudio Pescatore); 5: Observations on the Proceedings of the UNESCO Digital Memory Conference (Anne Claudel); 6: Discussion; 7: Archives and Digital Libraries (Per Carlsson); 8: Literature Survey on Markers and Memory Preservation (Marcos Buser); 9: Tsunami Stones Report - Development Work (Helen Gordon-Smith); 10: Markers Discussion (Jantine Schroeder); 11: Study of local communities' position on monitoring and the preservation of knowledge

  10. Patient-centered family meetings in palliative care: a quality improvement project to explore a new model of family meetings with patients and families at the end of life.

    Science.gov (United States)

    Sanderson, Christine R; Cahill, Philippa J; Phillips, Jane L; Johnson, Anne; Lobb, Elizabeth A

    2017-12-01

    Family meetings in palliative care can enhance communication with family members and identify unmet needs. However, the patient's voice may not be heard. This pre and post-test quality improvement project was conducted from 2013-2014 and investigated a patient-centered family meeting, which is a different approach to palliative care family meetings, to determine its feasibility and acceptability for patients, family and the palliative care team. Newly admitted patients to an Australian in-patient specialist palliative care unit were invited to ask anyone they wished to join them in a meeting with the palliative care team and to identify issues they wished to discuss. Consenting inpatients were interviewed shortly after admission; participated in a family meeting and re-interviewed 2-3 days after the meeting. Family members provided feedback at the end of the meeting. A focus group was held with staff for feedback on this new approach for family meetings. Meetings were observed, documented and thematically analyzed. Thirty-one newly admitted patients were approached to participate in a family meeting. Eighty-four percent had family meetings and the majority (96%) was attended by the patient. Thematic analysis revealed 69% of patient-centered meetings raised end-of-life concerns and 54% were "family-focused". Patient-centered family meetings in palliative care were shown to be feasible and acceptable for staff, patients and family members. Many patients and families spontaneously shared end-of-life concerns. A patient-centered approach to family meetings that includes active patient involvement may provide additional and valued opportunities for patients and families to: express mutual concerns, deliver messages of comfort and appreciation, and prepare for death. Further investigation of this approach, including families' bereavement outcomes, is warranted.

  11. Processing of Irradiated Graphite to Meet Acceptance Criteria for Waste Disposal. Results of a Coordinated Research Project

    International Nuclear Information System (INIS)

    2016-05-01

    Graphite is widely used in the nuclear industry and in research facilities and this has led to increasing amounts of irradiated graphite residing in temporary storage facilities pending disposal. This publication arises from a coordinated research project (CRP) on the processing of irradiated graphite to meet acceptance criteria for waste disposal. It presents the findings of the CRP, the general conclusions and recommendations. The topics covered include, graphite management issues, characterization of irradiated graphite, processing and treatment, immobilization and disposal. Included on the attached CD-ROM are formal reports from the participants

  12. The Society for Implementation Research Collaboration Instrument Review Project: a methodology to promote rigorous evaluation.

    Science.gov (United States)

    Lewis, Cara C; Stanick, Cameo F; Martinez, Ruben G; Weiner, Bryan J; Kim, Mimi; Barwick, Melanie; Comtois, Katherine A

    2015-01-08

    Identification of psychometrically strong instruments for the field of implementation science is a high priority underscored in a recent National Institutes of Health working meeting (October 2013). Existing instrument reviews are limited in scope, methods, and findings. The Society for Implementation Research Collaboration Instrument Review Project's objectives address these limitations by identifying and applying a unique methodology to conduct a systematic and comprehensive review of quantitative instruments assessing constructs delineated in two of the field's most widely used frameworks, adopt a systematic search process (using standard search strings), and engage an international team of experts to assess the full range of psychometric criteria (reliability, construct and criterion validity). Although this work focuses on implementation of psychosocial interventions in mental health and health-care settings, the methodology and results will likely be useful across a broad spectrum of settings. This effort has culminated in a centralized online open-access repository of instruments depicting graphical head-to-head comparisons of their psychometric properties. This article describes the methodology and preliminary outcomes. The seven stages of the review, synthesis, and evaluation methodology include (1) setting the scope for the review, (2) identifying frameworks to organize and complete the review, (3) generating a search protocol for the literature review of constructs, (4) literature review of specific instruments, (5) development of an evidence-based assessment rating criteria, (6) data extraction and rating instrument quality by a task force of implementation experts to inform knowledge synthesis, and (7) the creation of a website repository. To date, this multi-faceted and collaborative search and synthesis methodology has identified over 420 instruments related to 34 constructs (total 48 including subconstructs) that are relevant to implementation

  13. Learning from open source software projects to improve scientific review.

    Science.gov (United States)

    Ghosh, Satrajit S; Klein, Arno; Avants, Brian; Millman, K Jarrod

    2012-01-01

    Peer-reviewed publications are the primary mechanism for sharing scientific results. The current peer-review process is, however, fraught with many problems that undermine the pace, validity, and credibility of science. We highlight five salient problems: (1) reviewers are expected to have comprehensive expertise; (2) reviewers do not have sufficient access to methods and materials to evaluate a study; (3) reviewers are neither identified nor acknowledged; (4) there is no measure of the quality of a review; and (5) reviews take a lot of time, and once submitted cannot evolve. We propose that these problems can be resolved by making the following changes to the review process. Distributing reviews to many reviewers would allow each reviewer to focus on portions of the article that reflect the reviewer's specialty or area of interest and place less of a burden on any one reviewer. Providing reviewers materials and methods to perform comprehensive evaluation would facilitate transparency, greater scrutiny, and replication of results. Acknowledging reviewers makes it possible to quantitatively assess reviewer contributions, which could be used to establish the impact of the reviewer in the scientific community. Quantifying review quality could help establish the importance of individual reviews and reviewers as well as the submitted article. Finally, we recommend expediting post-publication reviews and allowing for the dialog to continue and flourish in a dynamic and interactive manner. We argue that these solutions can be implemented by adapting existing features from open-source software management and social networking technologies. We propose a model of an open, interactive review system that quantifies the significance of articles, the quality of reviews, and the reputation of reviewers.

  14. Vague project start makes project success of outsourced software development projects uncertain

    OpenAIRE

    Savolainen, Paula

    2010-01-01

    peer-reviewed A definition of a project success includes at least three criteria: 1) meeting planning goals, 2) customer benefits, and 3) supplier benefits. This study aims to point out the importance of the definition of the project start, the project start date, and what work should be included in the project effort in order to ensure the supplier's benefits. The ambiguity of the project start risks the profitability of the project and therefore makes project success at least from suppli...

  15. Summary report of a technical meeting on covariances of nuclear reaction data: GANDR project

    International Nuclear Information System (INIS)

    Trkov, A.

    2005-04-01

    Highlights of the technical meeting are given with respect to the detailed study of the feasibility of creating a tool for the Global Assessment of Nuclear Data Requirements (GANDR) based on sensitivity and uncertainty analysis. GANDR was concluded to be fully practical on a modern computer of the desktop class. Participants debated their requirements and formulated recommendations and proposals for implementation. Specific tasks were assigned to participants with an estimated time for their execution. (author)

  16. Learning from open source software projects to improve scientific review

    Directory of Open Access Journals (Sweden)

    Satrajit S Ghosh

    2012-04-01

    Full Text Available Peer-reviewed publications are the primary mechanism for sharing scientific results. The current peer-review process is, however, fraught with many problems that undermine the pace, validity, and credibility of science. We highlight five salient problems: (1 Reviewers are expected to have comprehensive expertise; (2 Reviewers do not have sufficient access to methods and materials to evaluate a study; (3 Reviewers are not acknowledged; (4 There is no measure of the quality of a review; and (5 Reviews take a lot of time, and once submitted cannot evolve. We propose that these problems can be resolved by making the following changes to the review process. Distributing reviews to many reviewers would allow each reviewer to focus on portions of the article that reflect the reviewer’s specialty or area of interest and place less of a burden on any one reviewer, enabling a more comprehensive and timely review. Providing reviewers materials and methods to perform comprehensive evaluation would facilitate transparency, replication of results and enable greater scrutiny by people from different fields using different nomenclature, leading to greater clarity and cross-fertilization of ideas. Acknowledging reviewers makes it possible to quantitatively assess reviewer contributions, which could be integrated with assessments for promotions and grants. Quantifying review quality could help establish the importance of reviewers and information generated during a review, and assess the importance of a submitted article. Finally, we recommend expediting post-publication reviews and allowing for the dialogue to continue and flourish in a dynamic and interactive manner. We argue that these solutions can be addressed by building upon computer programming code management systems. In this article, we provide examples of current code review systems that offer opportunities for addressing the above problems, and offer suggestions for enhancing code review systems for

  17. How Would an Eight-Division Army Meet Current and Likely Projected Strategic Requirements

    National Research Council Canada - National Science Library

    Cannon, Michael

    2001-01-01

    .... Given today's demographics and the projected future demographics of the primary recruited population of males and females ages 17 to 24, this challenge will only intensify as the Army and the other...

  18. Technical meeting on 'Review of solid and mobile fuels for partitioning and transmutation systems'. Working material

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    The topics covered during the Meeting were divided into two Sessions. Session 1 - Qualification of Solid and Mobile Fuels delt with: Neutronic, fuel and material properties of a molten salt transmuter; and Preliminary analysis of transmutation fuels for KALIMER. Session 2 - Reactor Physics and Safety Characteristics of Transmutation Systems based on Solid and Mobile Fuel Types included the following: Activity in NEA for P and T area; IAEA activities in the area of partitioning and transmutation; The R and D activity in Brazil: A conceptual fast energy amplifier ADS cooled by helium double stata Th/U fuel cycle; Closed fuel cycle and contemporary tendencies of the nuclear facilities development; Current Russian activities in P and T area; Pyrochemical reprocessing and nuclear spent fuel disposal project; Fuel selection criteria specific for double stratum minor actinide burners.

  19. Technical meeting to 'Review of national programmes on fast reactors and accelerator driven systems (ADS)'. Working material

    International Nuclear Information System (INIS)

    2002-01-01

    The 35th Annual Meeting of the Technical Working Group on Fast Reactors TWG-FR, previously International Working Group on Fast Reactors (IWG-FR, created in 1967), was hosted by the Forschungszentrum Karlsruhe (FZK) and was attended by TWG-FR members and advisers from the following Member States: Brazil, China, France, Germany, India, Japan, the Republic of Kazakhstan, the Republic of Korea, the Russian Federation, and the United States of America. The objectives of the meeting were: to exchange information on the national programmes on Fast Reactors (FR) and Accelerator Driven Systems (ADS); to review the progress since the 34th TWG-FR Annual Meeting, including the status of the actions; to consider meeting arrangements for 2002 and 2003; to review the Agency's co-ordinated research activities in the field of FRs and ADS, as well as co-ordination of the TWG-FR's activities with other organizations

  20. Technical meeting to 'Review of national programmes on fast reactors and accelerator driven systems (ADS)'. Working material

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-07-01

    The 35th Annual Meeting of the Technical Working Group on Fast Reactors TWG-FR, previously International Working Group on Fast Reactors (IWG-FR, created in 1967), was hosted by the Forschungszentrum Karlsruhe (FZK) and was attended by TWG-FR members and advisers from the following Member States: Brazil, China, France, Germany, India, Japan, the Republic of Kazakhstan, the Republic of Korea, the Russian Federation, and the United States of America. The objectives of the meeting were: to exchange information on the national programmes on Fast Reactors (FR) and Accelerator Driven Systems (ADS); to review the progress since the 34th TWG-FR Annual Meeting, including the status of the actions; to consider meeting arrangements for 2002 and 2003; to review the Agency's co-ordinated research activities in the field of FRs and ADS, as well as co-ordination of the TWG-FR's activities with other organizations.

  1. Medical students review of formative OSCE scores, checklists, and videos improves with student-faculty debriefing meetings.

    Science.gov (United States)

    Bernard, Aaron W; Ceccolini, Gabbriel; Feinn, Richard; Rockfeld, Jennifer; Rosenberg, Ilene; Thomas, Listy; Cassese, Todd

    2017-01-01

    Performance feedback is considered essential to clinical skills development. Formative objective structured clinical exams (F-OSCEs) often include immediate feedback by standardized patients. Students can also be provided access to performance metrics including scores, checklists, and video recordings after the F-OSCE to supplement this feedback. How often students choose to review this data and how review impacts future performance has not been documented. We suspect student review of F-OSCE performance data is variable. We hypothesize that students who review this data have better performance on subsequent F-OSCEs compared to those who do not. We also suspect that frequency of data review can be improved with faculty involvement in the form of student-faculty debriefing meetings. Simulation recording software tracks and time stamps student review of performance data. We investigated a cohort of first- and second-year medical students from the 2015-16 academic year. Basic descriptive statistics were used to characterize frequency of data review and a linear mixed-model analysis was used to determine relationships between data review and future F-OSCE performance. Students reviewed scores (64%), checklists (42%), and videos (28%) in decreasing frequency. Frequency of review of all metric and modalities improved when student-faculty debriefing meetings were conducted (p<.001). Among 92 first-year students, checklist review was associated with an improved performance on subsequent F-OSCEs (p = 0.038) by 1.07 percentage points on a scale of 0-100. Among 86 second year students, no review modality was associated with improved performance on subsequent F-OSCEs. Medical students review F-OSCE checklists and video recordings less than 50% of the time when not prompted. Student-faculty debriefing meetings increased student data reviews. First-year student's review of checklists on F-OSCEs was associated with increases in performance on subsequent F-OSCEs, however this

  2. A Global Review of Sustainable Construction Project Financing: Policies, Practices, and Research Efforts

    Directory of Open Access Journals (Sweden)

    Ming Shan

    2017-12-01

    Full Text Available Despite the increasing investment in sustainable development over the past decade, a systematic review of sustainable construction project financing is lacking. The objectives of this paper are to conduct a systematic review to examine the policies, practices, and research efforts in the area of sustainable construction project financing, and to explore the potential opportunities for the future research. To achieve these goals, this paper first reviewed the sustainable construction project financing practices implemented by four representative developed economies including the United Kingdom, the United States, Singapore, and Australia. Then, this paper reviewed the efforts and initiatives launched by three international organizations including the United Nations, the Organization for Economic Co-operation and Development, and International Finance Corporation. After that, this paper reviewed the research efforts of sustainable construction project financing published in peer-review journals and books. This paper identified four major research themes within this area, which are the review of financial stakeholders and market of sustainable construction, benefits and barriers to sustainable construction project financing, financial vehicles for sustainable construction projects, innovative models and mechanisms for sustainable construction project financing. Additionally, this paper revealed five directions for the future research of sustainable construction project financing, which are the identification of financial issues in sustainable construction projects, the investigation of financial vehicles for sustainable construction projects in terms of their strengths, limitations, and performances, the examination of critical drivers for implementing sustainable construction project financing, the development of a knowledge-based decision support system for implementing sustainable construction financing, and the development of best practices for

  3. 78 FR 18348 - Submission for OMB Review; Use of Project Labor Agreements for Federal Construction Projects

    Science.gov (United States)

    2013-03-26

    ...: There is no existing Governmentwide data base that collects PLAs and specifically the number submitted... Project Labor Agreements for Federal Construction Projects AGENCY: Department of Defense (DOD), General... information collection requirement regarding Use of Project Labor Agreements for Federal Construction Projects...

  4. Proceedings of RIKEN BNL Research Center Workshop, Volume 91, RBRC Scientific Review Committee Meeting

    Energy Technology Data Exchange (ETDEWEB)

    Samios,N.P.

    2008-11-17

    The ninth evaluation of the RIKEN BNL Research Center (RBRC) took place on Nov. 17-18, 2008, at Brookhaven National Laboratory. The members of the Scientific Review Committee (SRC) were Dr. Dr. Wit Busza (Chair), Dr. Miklos Gyulassy, Dr. Akira Masaike, Dr. Richard Milner, Dr. Alfred Mueller, and Dr. Akira Ukawa. We are pleased that Dr. Yasushige Yano, the Director of the Nishina Institute of RIKEN, Japan participated in this meeting both in informing the committee of the activities of the Nishina Institute and the role of RBRC and as an observer of this review. In order to illustrate the breadth and scope of the RBRC program, each member of the Center made a presentation on his/her research efforts. This encompassed three major areas of investigation, theoretical, experimental and computational physics. In addition the committee met privately with the fellows and postdocs to ascertain their opinions and concerns. Although the main purpose of this review is a report to RIKEN Management (Dr. Ryoji Noyori, RIKEN President) on the health, scientific value, management and future prospects of the Center, the RBRC management felt that a compendium of the scientific presentations are of sufficient quality and interest that they warrant a wider distribution. Therefore we have made this compilation and present it to the community for its information and enlightenment.

  5. How to Catch All Those Mutations—The Report of the Third Human Variome Project Meeting, UNESCO Paris, May 2010

    Science.gov (United States)

    Kohonen-Corish, Maija R.J.; Al-Aama, Jumana Y.; Auerbach, Arleen D.; Axton, Myles; Barash, Carol Isaacson; Bernstein, Inge; Béroud, Christophe; Burn, John; Cunningham, Fiona; Cutting, Garry R.; den Dunnen, Johan T.; Greenblatt, Marc S.; Kaput, Jim; Katz, Michael; Lindblom, Annika; Macrae, Finlay; Maglott, Donna; Möslein, Gabriela; Povey, Sue; Ramesar, Raj; Richards, Sue; Seminara, Daniela; Sobrido, María-Jesús; Tavtigian, Sean; Taylor, Graham; Vihinen, Mauno; Winship, Ingrid; Cotton, Richard G.H.

    2011-01-01

    The third Human Variome Project (HVP) Meeting “Integration and Implementation” was held under UNESCO Patronage in Paris, France, at the UNESCO Headquarters May 10–14, 2010. The major aims of the HVP are the collection, curation, and distribution of all human genetic variation affecting health. The HVP has drawn together disparate groups, by country, gene of interest, and expertise, who are working for the common good with the shared goal of pushing the boundaries of the human variome and collaborating to avoid unnecessary duplication. The meeting addressed the 12 key areas that form the current framework of HVP activities: Ethics; Nomenclature and Standards; Publication, Credit and Incentives; Data Collection from Clinics; Overall Data Integration and Access—Peripheral Systems/Software; Data Collection from Laboratories; Assessment of Pathogenicity; Country Specific Collection; Translation to Healthcare and Personalized Medicine; Data Transfer, Databasing, and Curation; Overall Data Integration and Access—Central Systems; and Funding Mechanisms and Sustainability. In addition, three societies that support the goals and the mission of HVP also held their own Workshops with the view to advance disease-specific variation data collection and utilization: the International Society for Gastrointestinal Hereditary Tumours, the Micronutrient Genomics Project, and the Neurogenetics Consortium. PMID:20960468

  6. How to catch all those mutations--the report of the third Human Variome Project Meeting, UNESCO Paris, May 2010.

    Science.gov (United States)

    Kohonen-Corish, Maija R J; Al-Aama, Jumana Y; Auerbach, Arleen D; Axton, Myles; Barash, Carol Isaacson; Bernstein, Inge; Béroud, Christophe; Burn, John; Cunningham, Fiona; Cutting, Garry R; den Dunnen, Johan T; Greenblatt, Marc S; Kaput, Jim; Katz, Michael; Lindblom, Annika; Macrae, Finlay; Maglott, Donna; Möslein, Gabriela; Povey, Sue; Ramesar, Raj; Richards, Sue; Seminara, Daniela; Sobrido, María-Jesús; Tavtigian, Sean; Taylor, Graham; Vihinen, Mauno; Winship, Ingrid; Cotton, Richard G H

    2010-12-01

    The third Human Variome Project (HVP) Meeting "Integration and Implementation" was held under UNESCO Patronage in Paris, France, at the UNESCO Headquarters May 10-14, 2010. The major aims of the HVP are the collection, curation, and distribution of all human genetic variation affecting health. The HVP has drawn together disparate groups, by country, gene of interest, and expertise, who are working for the common good with the shared goal of pushing the boundaries of the human variome and collaborating to avoid unnecessary duplication. The meeting addressed the 12 key areas that form the current framework of HVP activities: Ethics; Nomenclature and Standards; Publication, Credit and Incentives; Data Collection from Clinics; Overall Data Integration and Access-Peripheral Systems/Software; Data Collection from Laboratories; Assessment of Pathogenicity; Country Specific Collection; Translation to Healthcare and Personalized Medicine; Data Transfer, Databasing, and Curation; Overall Data Integration and Access-Central Systems; and Funding Mechanisms and Sustainability. In addition, three societies that support the goals and the mission of HVP also held their own Workshops with the view to advance disease-specific variation data collection and utilization: the International Society for Gastrointestinal Hereditary Tumours, the Micronutrient Genomics Project, and the Neurogenetics Consortium. © 2010 Wiley-Liss, Inc.

  7. Technical meeting to 'Review of national programmes on fast reactors and accelerator driven systems (ADS)'. Working material

    International Nuclear Information System (INIS)

    2003-01-01

    36th Annual Meeting of the Technical Working Group on Fast Reactors, the IAEA Technical Meeting (TM) on 'Review of National Programmes on Fast Reactors and Accelerator Driven Systems (ADS)', hosted by the Korean Atomic Energy Research Institute (KAERI) was attended by TWG-FR Members and Advisers from the following Member States (MS) and International Organizations: Brazil, France, Germany, India, Japan, the Republic of Kazakhstan, the Republic of Korea, the Russian Federation, the United Kingdom, the United States of America, and the OECD/NEA. The objectives of the meeting were to: 1) exchange information on the national programmes on Fast Reactors (FR) and Accelerator Driven Systems (ADS); 2) review the progress since the 35th TWG-FR Annual Meeting, including the status of the actions; 3) consider meeting arrangements for 2003 and 2004; 4) review the Agency's co-ordinated research activities in the field of FRs and ADS, as well as co-ordination of the TWG-FR's activities with other organizations. The participants made presentations on the status of the respective national programmes on FR and ADS development. A summary of the highlights for the period since the 35th TWG-FR Annual Meeting

  8. WARRP Decon-13: Subject Matter Expert (SME) Meeting Waste Screening and Waste Minimization Methodologies Project

    Science.gov (United States)

    2012-08-01

    media (e.g., zeolites ) that have been used to try to remove radionuclides from water that is being released to the ocean. Mr. Tupin stated...a wide-area RDD incident. The results from the SME Meeting were used to prepare a draft SOF to focus specifically on systems for waste segregation...Protection Agency (EPA), the U.S. Department of Defense (DoD), the U.S. Department of Energy (DOE), the U.S. Department of Health and Human Services (HHS

  9. Analysis of Nordic educational projects designed to meet challenges in society

    DEFF Research Database (Denmark)

    Liveng, Anne; Manninen, Jyri; Àrnason, Hróbjartur

    , process or structure identified in the successful projects: 1.Networking: Planning, implementation and development of the programme is based on networking of various - and even unexpected - organizations and players/participants. 2.Process evaluation: Continuous project development, documentation...... and analysis of results is inte-grated in the project, using Process Evaluation or Action Research 3.Flexibility: Programme offers flexible access and participation, individualized content or individualized study methods (ICT) 4.Focus on needs: A programme focuses on authentic regional, sectorial or individual...... learning providers, trade unions and other agencies supporting human development to create learning inter-ventions to address specific crisis, challenges or changes. In view of recent crises experienced by the Nordic countries The Education and Training Service Centre in Ice-land (www.frae.is) proposed...

  10. Review of design approaches of advanced pressurized LWRs. Report of a technical committee meeting and workshop

    International Nuclear Information System (INIS)

    1996-01-01

    The Technical Committee Meeting and Workshop was devoted to review and discuss differences and commonalties in the various design approaches with the aim of increasing the understanding of the design decisions taken, and a number of general conclusions were drawn. Though many differences in design approaches were found in the presentations, a number of common features could also be identified. These included design approaches to achieve further improvements with respect to safety, design simplification, reduction in cost, incorporation of feedback from operating experience, and control room improvements regarding human factors and digitization. Design approaches to achieve further improvements in safety included consideration of severe accidents in the design process, increased thermal margins and water inventories, longer grace periods and double containments. Refs, figs and tabs

  11. Review of design approaches of advanced pressurized LWRs. Report of a technical committee meeting and workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    The Technical Committee Meeting and Workshop was devoted to review and discuss differences and commonalties in the various design approaches with the aim of increasing the understanding of the design decisions taken, and a number of general conclusions were drawn. Though many differences in design approaches were found in the presentations, a number of common features could also be identified. These included design approaches to achieve further improvements with respect to safety, design simplification, reduction in cost, incorporation of feedback from operating experience, and control room improvements regarding human factors and digitization. Design approaches to achieve further improvements in safety included consideration of severe accidents in the design process, increased thermal margins and water inventories, longer grace periods and double containments. Refs, figs and tabs.

  12. Summary record of the experts meeting on the proposed OECD-IRSN STLOC project

    International Nuclear Information System (INIS)

    2004-01-01

    The purpose of this meeting was to determine the interest in member countries for the types of LOCA tests envisaged in the STLOC programme proposed by IRSN. The IRSN proposal was circulated among this Group in advance of the meeting. After the presentations and discussions, the Group recommendations were as follows: different views were expressed as to the need to perform the LOCA integral tests; there was an understanding that the results of separate effect tests (ANL, JAERI, Halden) would need to be obtained before deciding on the intended LOCA tests proposed in STLOC; IRSN and the OECD-NEA should explore the possibility to run the first ST test with air ingress (STLOC1), for which partial funding already exists (this test is foreseen for 2008); the need of LOCA tests as envisaged in STLOC should be re-assessed in about three years time (2006); analytical and experimental progress on LOCA tests should be monitored until then, through for instance the SEGFSM. An executive summary of the IRSN Source term LOCA program LOCA part is given in an appendix

  13. Committee Report of the BEPC-II Project Design Review May 13-15, 2002, SLAC

    Energy Technology Data Exchange (ETDEWEB)

    Kawakami, Traci M.

    2002-08-26

    As part of the US-China Cooperative Program in High Energy Physics for the year 2002, a BEPC-II Upgrade Review meeting was held at SLAC, May 13-15, 2002. The upgrade is aimed at improving the luminosity and performance of the BEPC facility at IHEP in Beijing, China with major upgrades to the injector linac, storage ring, and detector. This review addresses mainly the accelerator related issues. Prior to the review, an updated Draft Design Report was made available to the review team. Most important technical change since April 2001 has been a change from a single-ring configuration to a doublering. The goal of the review is to determine whether BEPC-II, if built as described, will meet the operations and physics goals. The charge to the review team is attached as Appendix A.

  14. ACCU MEETING

    CERN Document Server

    2007-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 5 December 2007 at 9:15 a.m. in room 60-6-002 1.\tChairman’s remarks7.\tEmergency Services at CERN 2.\tAdoption of the agenda\t8.\tThe Meyrin Tram project 3.\tMinutes of the previous meeting9.\tReports from ACCU representatives on other committees 4.\tMatters arising10.\tUsers’ Office news 5.\tNews from the CERN Management11.\tElection of ACCU Chair 6. LHC 2008 start-up events 6.\tLogistics and transport at CERN 12.\tAny Other Business 13.\tAgenda for the next meeting Anyone wishing to raise any points under item 12 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Aust...

  15. ACCU meeting

    CERN Document Server

    2007-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 5 December 2007 At 9:15 a.m. in room 60-6-002 1.\tChairman’s remarks 2.\tAdoption of the agenda 3.\tMinutes of the previous meeting 4.\tMatters arising 5.\tNews from the CERN Management 6.\tLHC 2008 start-up events 7.\tEmergency Services at CERN 8.\tThe Meyrin Tram project 9.\tReports from ACCU representatives on other committees 10.\tUsers’ Office news 11.\tElection of ACCU Chair 12.\tAny Other Business 13.\tAgenda for the next meeting Anyone wishing to raise any points under item 12 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria W. Adam (71661) Belgium G. Wilq...

  16. ACCU MEETING

    CERN Document Server

    2007-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 12 September 2007 at 9:15 a.m. in room 60-6-002 1.\tChairman’s remarks7.\tCar sharing pilot project 2.\tAdoption of the agenda\t8.\tReports from ACCU representatives on other committees 3.\tMinutes of the previous meeting9.\tUsers’ Office newss 4.\tMatters arising10.\tAny Other Business 5.\tNews from the CERN Management11.\tAgenda for the next meeting 6.\tLogistics and transport at CERN Anyone wishing to raise any points under item 10 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria\tW. Adam (71661)NorwayG. Løvhøiden (73176)Belgium\tG. Wilquet (74664)PolandM. Witek (78967)...

  17. ACCU MEETING

    CERN Document Server

    2006-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 6 December 2006 At 9:15 a.m. in room 60-6-002 Chairman's remarks Adoption of the agenda Minutes of the previous meeting Matters arising News from the CERN Management Safety at CERN Car sharing pilot project CERN Public Web Sites and Intranet Reports from ACCU representatives on other committees Users' Office news Any Other Business Agenda for the next meeting Anyone wishing to raise any points under item 11 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria W. Adam (71661) Belgium G. Wilquet (74664) Bulgaria   Czech Republic P. Závada (75877) Denmark J.B. Hansen (75941) Finl...

  18. ACCU Meeting

    CERN Document Server

    2007-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 7 March 2007 at 9:15 a.m. in room 60-6-002 Chairman's remarks Adoption of the agenda Minutes of the previous meeting Matters arising News from the CERN Management Car-sharing pilot project Reports from ACCU representatives on other committees Users' Office news Any Other Business Agenda for the next meeting Anyone wishing to raise any points under item 9 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria W. Adam (71661) Belgium G. Wilquet (74664) Bulgaria Czech Republic P. Závada (75877) Denmark J.B. Hansen (75941) Finland K. Lassila-Perini (79354) France F. Kunne S. ...

  19. ACCU Meeting

    CERN Multimedia

    2006-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 6 December 2006 At 9:15 a.m. in room 60-6-002 Chairman's remarks Adoption of the agenda Minutes of the previous meeting Matters arising News from the CERN Management Safety at CERN Car sharing pilot project CERN Public Web Sites and Intranet Reports from ACCU representatives on other committees Users' Office news Any Other Business Agenda for the next meeting Anyone wishing to raise any points under item 11 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria W. Adam (71661) Belgium G. Wilquet (74664) Bulgaria   Czech Republic P. Závada (75877) Denmark J.B. Hansen (75941) Finl...

  20. ACCU MEETING

    CERN Document Server

    2007-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 12 September 2007 at 9:15 a.m. in room 60-6-002 1.\tChairman’s remarks6.\tLogistics and transport at CERN2.\tAdoption of the agenda\t7.\tCar sharing pilot project3.\tMinutes of the previous meeting8.\tReports from ACCU representatives on other committees4.\tMatters arising9.\tUsers’ Office newss5.\tNews from the CERN Management10.\tAny Other Business11.\tAgenda for the next meeting Anyone wishing to raise any points under item 10 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria\tW. Adam (71661)NorwayG. Løvhøiden (73176)Belgium\tG. Wilquet (74664)PolandM. Witek (78967)Bulgaria\tPortugalP...

  1. ACCU Meeting

    CERN Document Server

    2007-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 7 March 2007 at 9:15 a.m. in room 60-6-002 Chairman's remarks Adoption of the agenda Minutes of the previous meeting Matters arising News from the CERN Management Car-sharing pilot project Reports from ACCU representatives on other committees Users' Office news Any Other Business Agenda for the next meeting Anyone wishing to raise any points under item 9 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria W. Adam (71661) Belgium G. Wilquet (74664) Bulgaria Czech Republic P. Závada (75877) Denmark J.B. Hansen (75941) Finland K. Lassila-Perini (79354) France F. Kunne S. La...

  2. ACCU MEETING

    CERN Multimedia

    PH Department

    2009-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 11 March 2009 At 9:15 a.m. in room 60-6-002 Chairman’s remarks Adoption of the agenda Minutes of the previous meeting Matters arising News from the CERN Management The CERN Press Office An update on Safety at CERN The Burotel project Reports from ACCU representatives on other committees Users’ Office news Any Other Business Agenda for the next meeting Anyone wishing to raise any points under item 11 is invited to send them to the Chairman in writing or by e-mail to mailto:Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria G. Walzel () Belgium C. Vander Velde (71539) Bulgaria Czech Republic P. Závada (75877) Denmark...

  3. ACCU MEETING

    CERN Multimedia

    PH Department

    2009-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 11 March 2009 At 9:15 a.m. in room 60-6-002 1.\tChairman’s remarks 2.\tAdoption of the agenda 3.\tMinutes of the previous meeting 4.\tMatters arising 5.\tNews from the CERN Management 6.\tThe CERN Press Office 7.\tAn update on Safety at CERN 8.\tThe Burotel project 9.\tReports from ACCU representatives on other committees 10.\tUsers’ Office news 11.\tAny Other Business 12.\tAgenda for the next meeting Anyone wishing to raise any points under item 11 is invited to send them to the Chairman in writing or by e-mail to mailto:Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria G. Walzel () Belgium C. Vander Velde (71539) Bulgaria C...

  4. ACCU Meeting

    CERN Document Server

    Chris Onions

    2006-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 14 June 2006 At 9:15 a.m. in room 60-6-002 Chairman's remarks Adoption of the agenda Minutes of the previous meeting Matters arising News from the CERN Management Car sharing pilot project The CERN Document Server : the portal to Open Access Videoconferencing and collaborative tools at CERN Reports from ACCU representatives on other committees Users' Office news Any Other Business Agenda for the next meeting Anyone wishing to raise any points under item 11 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria W. Adam (71661) Belgium G. Wilquet (74664) Bulgaria Czech Republic P. Závada (7...

  5. ACCU Meeting

    CERN Document Server

    Chris Onions

    2006-01-01

    DRAFT Agenda for the meeting to be held on Wednesday 14 June 2006 At 9:15 a.m. in room 60-6-002 Chairman's remarks Adoption of the agenda Minutes of the previous meeting Matters arising News from the CERN Management Car sharing pilot project The CERN Document Server : the portal to Open Access Videoconferencing and collaborative tools at CERN Reports from ACCU representatives on other committees Users'Office news Any Other Business Agenda for the next meeting Anyone wishing to raise any points under item 11 is invited to send them to the Chairman in writing or by e-mail to Christopher.Onions@cern.ch Chris Onions (Secretary) ACCU is the forum for discussion between the CERN Management and the representatives of CERN Users to review the practical means taken by CERN for the work of Users of the Laboratory. The User Representatives to ACCU are (CERN internal telephone numbers in brackets): Austria W. Adam (71661) Belgium G. Wilquet (74664) Bulgaria Czech Republic P. Závada (75877) ...

  6. Sakhalin 2, phase 2 project : meeting the Arctic challenge in a sub-Arctic environment

    International Nuclear Information System (INIS)

    Reece, A.; Gerges, A.; Efthymiou, M.; Winkler, M.

    2008-01-01

    Sakhalin Energy's objective is to commercially develop, operate and market the hydrocarbon resources and associated infrastructure governed by the Sakhalin 2 licenses for the sustainable benefit of shareholders, the Russian Federation, the Sakhalin Oblast and the wider community. This presentation discussed Sakhalin Energy's holdings including its investment company and hydrocarbon projects in eastern Russia. The Sakhalin area is a remote island that lacks infrastructure, has a low population density, with a rich onshore and offshore wildlife. It is a seismically active area, with seasonal operating windows, drifting pack ice from December to June, waves up to 18 metre maximum height, and frequent fog in spring and summer. The temperature also varies from 28 degrees Celsius to -40 degrees Celsius. The presentation also addressed the rerouting of offshore pipelines to ensure the least possible disturbance to western gray whale migration. Several photographs and illustrations of the phase 1 project were presented. Open water conditions were also illustrated. The phase 2 project was then outlined. This included illustrations of the platform, plant and export terminal, and onshore processing facility. Other photographs that were shown in the presentation included the offshore pipeline installation; a view of the shore approach to the pipeline installation; oil spill response; and escape, evacuation, and response. The design challenges and design philosophy of the project were also identified. The presentation concluded with a discussion of ice loading and platform response. figs

  7. Sakhalin 2, phase 2 project : meeting the Arctic challenge in a sub-Arctic environment

    Energy Technology Data Exchange (ETDEWEB)

    Reece, A.; Gerges, A.; Efthymiou, M.; Winkler, M. [Sakhalin Energy, Moscow (Russian Federation)

    2008-09-15

    Sakhalin Energy's objective is to commercially develop, operate and market the hydrocarbon resources and associated infrastructure governed by the Sakhalin 2 licenses for the sustainable benefit of shareholders, the Russian Federation, the Sakhalin Oblast and the wider community. This presentation discussed Sakhalin Energy's holdings including its investment company and hydrocarbon projects in eastern Russia. The Sakhalin area is a remote island that lacks infrastructure, has a low population density, with a rich onshore and offshore wildlife. It is a seismically active area, with seasonal operating windows, drifting pack ice from December to June, waves up to 18 metre maximum height, and frequent fog in spring and summer. The temperature also varies from 28 degrees Celsius to -40 degrees Celsius. The presentation also addressed the rerouting of offshore pipelines to ensure the least possible disturbance to western gray whale migration. Several photographs and illustrations of the phase 1 project were presented. Open water conditions were also illustrated. The phase 2 project was then outlined. This included illustrations of the platform, plant and export terminal, and onshore processing facility. Other photographs that were shown in the presentation included the offshore pipeline installation; a view of the shore approach to the pipeline installation; oil spill response; and escape, evacuation, and response. The design challenges and design philosophy of the project were also identified. The presentation concluded with a discussion of ice loading and platform response. figs.

  8. 78 FR 79707 - Notice of Public Meeting, Gateway West Project Subcommittee of the Boise District Resource...

    Science.gov (United States)

    2013-12-31

    ... Resource Advisory Council on matters of planning and management of the Gateway West Project (sections 8 and... Interior, through the BLM, on a variety of planning and management issues associated with public land... a telecommunications device for the deaf (TDD) may call the Federal Information Relay Service (FIRS...

  9. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack; Hwang, Diana

    1984-11-01

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  10. Proceedings of the Advanced Turbine Systems Annual Program Review meeting. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    Goal of the 8-year program is to develop cleaner, more efficient, and less expensive gas turbine systems for utility and industrial electric power generation, cogeneration, and mechanical drive units. The conference is held annually for energy executives, engineers, scientists, and other interested parties industry, academia, and Government. Advanced turbine systems topics discussed during five technical sessions included policy and strategic issues, program element overviews and technical reviews, related activities, university/industry consortium interactions, and supportive projects. Twenty-one papers presented during the technical sessions are contained in this volume; they are processed separately for the data base.

  11. Review of the project risk management plan in the capital projects organization at ConocoPhillips

    OpenAIRE

    Meidell, Camilla

    2011-01-01

    Master's thesis in Risk management Project Risk Management (PRM) has in recent years become an important aspect of business organization and project management. There has always been a requirement for some risk management at COPNO. However about 3 years ago the process became much more defined and has become a requirement for the contingency used on projects to be based upon the risking process. Since risk management in projects is a requirement in the CP organization it is ...

  12. Technical meeting of project counterparts on 'Cyclotron production of Iodine-123'. Report

    International Nuclear Information System (INIS)

    2002-01-01

    Several cyclotron laboratory facilities are very much interested in the production of Iodine-123 for medical applications in view of its optimal physical and chemical properties. Some of these countries have in the past used the solid target technology based on utilization of enriched Tellurium targets and are currently involved in the development of enriched Xenon-124 gas targets to improved radionuclidic purity as required by the needs of modern nuclear medicine. With the purpose of discussing the advances in the later route of production and to foster mutual co-operation among the developing countries interested in this technology, a meeting was convened with the participation of scientists from Argentina, Brazil, Iran, Korea and Syria. A scientist from the United States was also invited as an expert to provide advise on particular aspects of the technology. This publication contains as an annex technical reports from the participating institutions. All of these reports have been separately indexed and provided with abstracts

  13. 77 FR 2766 - Arts Advisory Panel Meeting

    Science.gov (United States)

    2012-01-19

    ... NATIONAL FOUNDATION ON THE ARTS AND THE HUMANITIES Arts Advisory Panel Meeting AGENCY: National Endowment for the Arts, National Foundation on the Arts and Humanities. ACTION: Notice; correction. SUMMARY... and Regional/Folk and Traditional Arts (state folk arts projects review) meeting, scheduled for...

  14. Review of national accelerator driven system programmes for partitioning and transmutation. Proceedings of an advisory group meeting

    International Nuclear Information System (INIS)

    2003-08-01

    One of the current important issues of nuclear power is the long lived radioactive waste toxicity problem. The sharpness of this problem could be considerably reduced if, during energy production, there was the possibility to incinerate at least the most toxic radioactive isotopes (long lived fission products and minor actinides). The combination of external intensive neutron sources with facilities containing nuclear fuel, so-called hybrid systems, are under investigation in several countries. The surplus of neutrons in such systems may be used to convert most of the long lived radioactive nuclides into isotopes having a shorter lifetime. Currently, an increasing number of groups are entering this field of research. There is clearly a need for co-originated their efforts, and also for the exchange of information from nationally or internationally co-ordinated activities. Consideration of the advantages of hybrid systems, and the wide field of interdisciplinary areas of research involved, show the need for an international co-operation in this novel R and D area. The International Atomic Energy Agency has maintained an active interest in advanced nuclear technology related to accelerator driven systems (ADS), and related activities have been carried out within the framework of its programme on emerging nuclear energy systems. After thorough analyses of the outcomes of several international forums and recommendations of the IAEA Technical Committee Meeting on Feasibility and Motivation for Hybrid Concepts for Nuclear Energy Generation and Transmutation (Madrid, Spain, 1997), the IAEA conducted an Advisory Group Meeting on Review of National Accelerator Driven System Programmes in Taejon, Republic of Korea, from 1 to 4 November 1999. The scope of the meeting included review of the current R and D programmes in the Member States and the assessment of the progress in the development of hybrid concepts. The programme of the AGM included the following topics

  15. Stone Soup Projects: Using real-time resources and creative partnering to meet multiple needs

    Science.gov (United States)

    McLean, S.; Searle, R.; Zala, K.

    2010-12-01

    Ocean Networks Canada oversees the VENUS and NEPTUNE Canada undersea cabled observatories. Its Centre for Enterprise and Engagement communicates the scientific discoveries and technological innovations happening at the two systems. Not surprisingly, funders in ocean science are interested in seeing evidence of increased recruitment of Highly Qualified Personnel into marine science and industry. This demand creates a series of opportunities for inspiring students, ranging from graduate school down to middle school, to pursue studies in chemistry, biology, physics, geology, engineering, and beyond. As the Engagement section is a small operation, we partner with others to produce educational assets incorporating real-time data from VENUS and NEPTUNE Canada observatories that enable frontline educators to create exciting ocean science experiences for students and the public. In one project, the lab component of an entire undergraduate course lets students conduct their own investigations into marine oxygen levels by using VENUS data. In another, Fine Arts graduate and undergraduate students are using high-tech tools to create a series of webisodes that map the principles of Ocean Literacy onto the science themes of VENUS and NEPTUNE Canada. In a third project, we hosted a website for a collaborative expedition to small coastal towns that focused on the marine science happening in the Salish Sea, British Columbia. Our projects and challenges for engaging students and the public with ocean science using real-time and other data offer strategies for outreach and education sections of similar organizations.

  16. FERC approves process for Lake Erie link: Project meets significant regulatory milestone

    International Nuclear Information System (INIS)

    Anon

    2002-01-01

    The Federal Electric Regulatory Commission (FERC) of the United States has issued an order to TransEnergie US Ltd., and Hydro One Inc., authorizing the sale of transmission rights for the proposed Lake Erie link. This project will consists of bi-directional high voltage direct current facilities connecting the transmission grids of Ontario, Canada and the United States. The sale is authorized to proceed via a non-discriminatory 'open season' process. The project will consist of buried underwater cables under Lake Erie connecting the transmission systems near Simcoe, Ontario with those in the US at either, or both, of Springfield, Pennsylvania, and Ashtabula, Ohio. The project will provide an increase in transmission capability of up to 975 MW between the electric control areas of the Ontario Independent Electricity Market Operator, the East Central Area Reliability Coordination Agreement in Ohio and the Pennsylvania-New Jersey-Maryland Interconnection. The Lake Erie Link will be financially supported by those consumers who see value in the associated transmission rights, rather than through the regulated rates paid by transmission customers in general. The article provides an overview of the background of the Lake Erie Link, the cable system, the converter station, and the potential economic benefits

  17. 18 CFR 806.4 - Projects requiring review and approval.

    Science.gov (United States)

    2010-04-01

    ... result of a change of the name, identity, internal corporate structure or place of organization and does... period, and undergoing a change of ownership, unless such project satisfies the requirements of..., and undergoing a change of ownership, unless such project satisfies the requirements of paragraphs (b...

  18. 76 FR 51938 - Southwest Mississippi Resource Advisory Committee; Meeting

    Science.gov (United States)

    2011-08-19

    ... Resource Advisory Committee will meet in Meadville, MS. The committee is authorized under the Secure Rural... relationships and to provide advice and recommendations to the Forest Service concerning projects and funding... review and select proposed projects. DATES: The meeting will be held September 15, 2011, 6:00 p.m...

  19. A desk evaluation review of project POL/5/006 plant breeding using induced mutations. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    Projects POL/5/006 was initiated in 1985 to assist the Government of Poland in improving the mutation breeding efforts in the country to promote the development of new and higher yielding crop varieties. The difficult economic situation in the country at this time restricted the procurement of special equipment, spare parts and supplies from abroad and, therefore, impeded research and development work in this field. The project was implemented using a distinctive approach and design characterized by having six recipient institutions and the establishment of one central gamma-irradiation facility to be made available to all participating institutions for mutation induction. The project was formally closed in 1989. The review of project POL/5/006 was undertaken in accord with the expressed wishes of the Board of Governors for selected ex-post evaluations of completed projects. The main purpose of the review was to ascertain if the project objectives were achieved, and to determine what impact the technical assistance provided may have had on continued post-project and current plant breeding programmes in Poland

  20. A desk evaluation review of project POL/5/006 plant breeding using induced mutations. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-09-14

    Projects POL/5/006 was initiated in 1985 to assist the Government of Poland in improving the mutation breeding efforts in the country to promote the development of new and higher yielding crop varieties. The difficult economic situation in the country at this time restricted the procurement of special equipment, spare parts and supplies from abroad and, therefore, impeded research and development work in this field. The project was implemented using a distinctive approach and design characterized by having six recipient institutions and the establishment of one central gamma-irradiation facility to be made available to all participating institutions for mutation induction. The project was formally closed in 1989. The review of project POL/5/006 was undertaken in accord with the expressed wishes of the Board of Governors for selected ex-post evaluations of completed projects. The main purpose of the review was to ascertain if the project objectives were achieved, and to determine what impact the technical assistance provided may have had on continued post-project and current plant breeding programmes in Poland.