WorldWideScience

Sample records for project review committee

  1. Compilation of reports of the Advisory Committee on Reactor Safeguards, 1957-1984. Volume 2. Project Reviews G-P

    International Nuclear Information System (INIS)

    1985-04-01

    This six-volume compilation contains over 1000 reports prepared by the Advisory Committee on Reactor Safeguards from September 1957 through December 1984. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and within project name by chronological order. Part 2 categorizes the reports by the most appropriate generic subject area and within subject area by chronological order

  2. Compilation of reports of the Advisory Committee on Reactor Safeguards, 1957-1984. Volume 1. Project Reviews A-F

    International Nuclear Information System (INIS)

    1985-04-01

    This six-volume compilation contains over 1000 reports prepared by the Advisory Committee on Reactor Safeguards from September 1957 through December 1984. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and within project name by chronological order. Part 2 categorizes the reports by the most appropriate generic subject area and within subject area by chronological order. This volume contains project reviews arranged alphabetically from A to F

  3. Report of the International Review Committee of the joint proposal of the Japan Hadron Facility (KEK) and the Neutron Science Project (JAERI)

    International Nuclear Information System (INIS)

    1999-08-01

    The International Review Committee composed of twelve Japanese and foreign experts was set up under the Research Evaluation Committee of JAERI, and has reviewed the proposed joint project combining JAERI's Neutron Science Project and KEK's Japan Hadron Facility into one major facility. The review meeting took place on April 26-27, 1999, at JAERI Head quarters, Tokyo. According to the points of review given in advance, the review was implemented based on the joint project report submitted and presentations of both institutions. The Research Evaluation Committee received the review report and its explanations from the Review Committee on July 5. The Research Evaluation Committee has acknowledged appropriateness of the review results. This report describes the review results. (author)

  4. Compilation of reports of the Advisory Committee on Reactor Safeguards, 1957-1984. Volume 3. Project Reviews Q-Z

    International Nuclear Information System (INIS)

    1985-04-01

    This six-volume compilation contains over 1000 reports prepared by the Advisory Committee on Reactor Safeguards from September 1957 through December 1984. The reports are divided into two groups: Part 1: ACRS Resports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and within project name by chronological order. Part 2 categorizes the reports by the most appropriate generic subject area and within subject area by chronological order. This volume includes reports arranged alpbabetically from Q to Z

  5. Amoco-US Environmental Protection Agency, pollution prevention project, Yorktown, Virginia: Project peer review. Report of the Peer Review Committee of the Amoco/EPA Pollution Prevention Project at the Yorktown, Virginia refinery

    International Nuclear Information System (INIS)

    Klee, H.; Podar, M.

    1991-01-01

    The Amoco/EPA Pollution Prevention Project involved a number of representatives from federal and Virginia regulatory agencies, and Amoco's refining business. Participants believed that the Project could benefit from a broader perspective than these organizations along might provide. The Project Work Group selected an independent Peer Review Process which was conducted by Resource for the Future (RFF), a Washington DC think tank. A group of technical, policy and environmental experts from diverse backgrounds served as Peer Review members. The Peer Review Committee met on three occasions to discuss (1) the Project Work Plan (2) sampling data and interpretation and (3) project conclusions and recommendations. The focus of the meeting was on the general scope and content of the project

  6. Regulatory Review Committee update

    Energy Technology Data Exchange (ETDEWEB)

    Steele, T. [Polishuk, Camman and Steele, London ON (Canada)

    2001-07-01

    The Committee's objectives, current membership and current issues are reviewed. Each current issue, notably the consultation process with the Ministry of Natural Resources, appeal of Ministry actions, orphan wells/security deposits, oilfield fluid disposal and labour code practices review are discussed in some detail. Dissatisfaction with the current appeals process to the Ministry is highlighted, along with a search for an all encompassing solution. The orphan well problem also received considerable attention, with similar demands for a comprehensive solution.

  7. Crystalline Repository Project: Review and comment of the Leech Lake Reservation Business Committee: Draft area recommendation report

    International Nuclear Information System (INIS)

    1986-09-01

    The Leech Lake Reservation Business Committee (LLRBC) has reviewed five documents related to the US Department of Energy's Crystalline Repository Project (CRP). They are the ''National Survey of Crystalline Rocks,'' ''General Guidelines for the Recommendation of Sites for the Nuclear Waste Repositories;' Final Siting Guidelines (10 CFR Part 960),'' ''Regional Characterization Reports for the North Central Region,'' the ''Region to Area Screening Methodology Document'' (SMD) and the ''Draft Area Recommendation Report'' (DARR). The comments and discussions of issues contained in this review will be considered in the preparation of the Final Area Recommendation Report, which will formally identify potentially acceptable sites for a second national repository for the permanent disposal of high level nuclear waste. Following a review of the above referenced documents, the LLRBC has concluded that the identification of potentially acceptable sites in the Draft Area Recommendation Report is based upon inferior and incomplete technical information being applied to a flawed screening process which, among other deficiencies, pays little attention to the importance of hydrological factors in the siting process. Although the DOE prefers that comments from states and tribes be directed at the Draft Area Recommendation Report alone, the Leech Lake Reservation Business Committee is extremely concerned about inadequacies in the ''National Survey of Crystalline Rocks'' (ORCD-1), which serves as the foundation for all siting work done to date. The national survey was conducted utilizing little of the time or staffing required for this important phase of the Crystalline Repository Program. As a result, the national survey is based upon out-of-date scientific literature, exaggerates certain screening variables that favor the selection of regions in the eastern US and arbitrarily eliminated the few western crystalline rock bodies that passed the questionable screening process utilized

  8. Committee Report of the BEPC-II Project Design Review May 13-15, 2002, SLAC

    Energy Technology Data Exchange (ETDEWEB)

    Kawakami, Traci M.

    2002-08-26

    As part of the US-China Cooperative Program in High Energy Physics for the year 2002, a BEPC-II Upgrade Review meeting was held at SLAC, May 13-15, 2002. The upgrade is aimed at improving the luminosity and performance of the BEPC facility at IHEP in Beijing, China with major upgrades to the injector linac, storage ring, and detector. This review addresses mainly the accelerator related issues. Prior to the review, an updated Draft Design Report was made available to the review team. Most important technical change since April 2001 has been a change from a single-ring configuration to a doublering. The goal of the review is to determine whether BEPC-II, if built as described, will meet the operations and physics goals. The charge to the review team is attached as Appendix A.

  9. Measuring inconsistency in research ethics committee review.

    Science.gov (United States)

    Trace, Samantha; Kolstoe, Simon Erik

    2017-11-28

    The review of human participant research by Research Ethics Committees (RECs) or Institutional Review Boards (IRBs) is a complex multi-faceted process that cannot be reduced to an algorithm. However, this does not give RECs/ IRBs permission to be inconsistent in their specific requirements to researchers or in their final opinions. In England the Health Research Authority (HRA) coordinates 67 committees, and has adopted a consistency improvement plan including a process called "Shared Ethical Debate" (ShED) where multiple committees review the same project. Committee reviews are compared for consistency by analysing the resulting minutes. We present a description of the ShED process. We report an analysis of minutes created by research ethics committees participating in two ShED exercises, and compare them to minutes produced in a published "mystery shopper" exercise. We propose a consistency score by defining top themes for each exercise, and calculating the ratio between top themes and total themes identified by each committee for each ShED exercise. Our analysis highlights qualitative differences between the ShED 19, ShED 20 and "mystery shopper" exercises. The quantitative measure of consistency showed only one committee across the three exercises with more than half its total themes as top themes (ratio of 0.6). The average consistency scores for the three exercises were 0.23 (ShED19), 0.35 (ShED20) and 0.32 (mystery shopper). There is a statistically significant difference between the ShED 19 exercise, and the ShED 20 and mystery shopper exercises. ShED exercises are effective in identifying inconsistency between ethics committees and we describe a scoring method that could be used to quantify this. However, whilst a level of inconsistency is probably inevitable in research ethics committee reviews, studies must move beyond the ShED methodology to understand why inconsistency occurs, and what an acceptable level of inconsistency might be.

  10. Nuclear Safety Research Review Committee

    International Nuclear Information System (INIS)

    Todreas, N.E.

    1990-01-01

    The Nuclear Safety Research Review Committee has had a fundamental difficulty because of the atmosphere that has existed since it was created. It came into existence at a time of decreasing budgets. For any Committee the easiest thing is to tell the Director what additional to do. That does not really help him a lot in this atmosphere of reduced budgets which he reviewed for you on Monday. Concurrently the research arm of Nuclear Regulatory Commission has recognized that the scope of its activity needed to be increased rather than decreased. In the last two-and-a-half-year period, human factors work was reinstated, radiation and health effects investigations were reinvigorated, research in the waste area was given significant acceleration. Further, accident management came into being, and the NRC finally got back into the TMI-2 area. So with all of those activities being added to the program at the same time that the research budget was going down, the situation has become very strained. What that leads to regarding Committee membership is a need for technically competent generalists who will be able to sit as the Division Directors come in, as the contractors come in, and sort the wheat from the chaff. The Committee needs people who are interested in and have a broad perspective on what regulatory needs are and specifically how safety research activities can contribute to them. The author summarizes the history of the Committee, the current status, and plans for the future

  11. Joint Integration Office Independent Review Committee annual report, 1985

    International Nuclear Information System (INIS)

    1986-08-01

    Comprised of seven persons with extensive experience in the issues of nuclear waste, the Independent Review Committee (IRC) provides independent and objective review of Defense Transuranic Waste Program (DTWP) activities managed by the Joint Integration Office (JIO), formerly the Defense Transuranic Waste Lead Organization (TLO). The Committee is ensured a broad, interdisciplinary perspective since its membership includes representatives from the fields of nuclear engineering, nuclear waste transportation, industrial quality control, systems and environmental engineering and state and local government. The scope of IRC activities includes overall review of specific TLO plans, projects and activities, and technical review of particular research and development projects. The Committee makes specific suggestions and recommendations based upon expertise in the field of TRU Waste Management. The IRC operates as a consulting group, under an independent charter providing objective review of program activities. This report summarizes the 12 major topics reviewed by the committee during 1985

  12. International Project Management Committee: Overview and Activities

    Science.gov (United States)

    Hoffman, Edward

    2010-01-01

    This slide presentation discusses the purpose and composition of the International Project Management Committee (IMPC). The IMPC was established by members of 15 space agencies, companies and professional organizations. The goal of the committee is to establish a means to share experiences and best practices with space project/program management practitioners at the global level. The space agencies that are involved are: AEB, DLR, ESA, ISRO, JAXA, KARI, and NASA. The industrial and professional organizational members are Comau, COSPAR, PMI, and Thales Alenia Space.

  13. Spent nuclear fuel Canister Storage Building CDR Review Committee report

    International Nuclear Information System (INIS)

    Dana, W.P.

    1995-12-01

    The Canister Storage Building (CSB) is a subproject under the Spent Nuclear Fuels Major System Acquisition. This subproject is necessary to design and construct a facility capable of providing dry storage of repackaged spent fuels received from K Basins. The CSB project completed a Conceptual Design Report (CDR) implementing current project requirements. A Design Review Committee was established to review the CDR. This document is the final report summarizing that review

  14. Review by a local medical research ethics committee of the conduct of approved research projects, by examination of patients' case notes, consent forms, and research records and by interview.

    Science.gov (United States)

    Smith, T; Moore, E J; Tunstall-Pedoe, H

    1997-05-31

    To monitor the conduct of medical research projects that have already been approved by the local medical research ethics committee. Follow up study of ethically approved studies (randomly selected from all the studies approved in the previous year) by examination of patients' case notes, consent forms, and research records and by interview of the researchers at their workplace. Tayside, Scotland (mixed rural and urban population). 30 research projects approved by Tayside local medical research ethics committee. Adherence to the agreed protocol, particularly for recruitment (obtaining and recording informed consent) and for specific requirements of the ethics committee, including notification of changes to the protocol and of adverse events. In one project only oral consent had been obtained, and in a quarter of the studies one or more consent forms were incorrectly completed. Inadequate filing of case notes in five studies and of consent forms in six made them unavailable for scrutiny. Adverse events were reported, but there was a general failure to report the abandoning or non-starting of projects in two studies the investigators failed to notify a change in the responsible researcher. Monitoring of medical research by local medical research ethics committees promotes and preserves ethical standards, protects subjects and researchers, discourages fraud, and has the support of investigators. We recommend that 10% of projects should undergo on-site review, with all others monitored by questionnaire. This would require about six person hours of time and a salary bill of 120 pounds per study monitored.

  15. Measuring inconsistency in research ethics committee review

    OpenAIRE

    Trace, Samantha; Kolstoe, Simon Erik

    2017-01-01

    Background The review of human participant research by Research Ethics Committees (RECs) or Institutional Review Boards (IRBs) is a complex multi-faceted process that cannot be reduced to an algorithm. However, this does not give RECs/ IRBs permission to be inconsistent in their specific requirements to researchers or in their final opinions. In England the Health Research Authority (HRA) coordinates 67 committees, and has adopted a consistency improvement plan including a process called “Sha...

  16. Report of the marketing science editorial review committee

    NARCIS (Netherlands)

    Fader, Peter S.; Bronnenberg, B.J.J.A.M.; Lyer, Ganesh; Neslin, Scott A.; Netzer, Oded; Srinivasan, Kannan

    2014-01-01

    This is an abridged version of an evaluation report for Marketing Science, which was commissioned by the INFORMS Publications Committee as part of its periodic review of every INFORMS journal. The coauthors listed here comprised the task force that conducted the research project and strategic

  17. Pulsed Power Peer Review Committee Report

    International Nuclear Information System (INIS)

    BLOOMQUIST, DOUGLAS D.

    2002-01-01

    In 1993, the Government Performance and Results Act (GPRA, PL 103-62) was enacted. GPRA, which applies to all federal programs, has three components: strategic plans, annual performance plans, and metrics to show how well annual plans are being followed. As part of meeting the GRPA requirement in FY2002, a 15-member external review committee chaired by Dr. Alvin Trivelpiece (the Trivelpiece Committee) was convened by Sandia National Laboratories (SNL) on May 7-9, 2002 to review Sandia National Laboratories' Pulsed Power Programs as a component of the Performance Appraisal Process negotiated with the National Nuclear Security Administration of the Department of Energy (NNSA/DOE). The scope of the review included activities in high energy density physics (HEDP), inertial confinement fusion (ICF), radiation/weapon physics, the petawatt laser initiative (PW) and fast ignition, equation-of-state studies, radiation effects science and lethality, x-ray radiography, ZR development, basic research and pulsed power technology research and development, as well as electromagnetics and work for others. In his charge to the Committee, Dr. Jeffrey P. Quintenz, Director of Pulsed Power Sciences (Org. 1600) asked that the evaluation and feedback be based on three criteria: (1) quality of technical activities in science, technology, and engineering, (2) programmatic performance, management, and planning, and (3) relevance to national needs and agency missions. In addition, the director posed specific programmatic questions. The accompanying report, produced as a SAND document, is the report of the Committee's finding

  18. Bond Feasibility Study. Project Identification Committee Report.

    Science.gov (United States)

    Wichita Public Schools, KS.

    A committee, appointed by the Board of Education, was requested to make a comprehensive study of the school building needs of Unified School District No. 259. In an attempt to determine the feasibility of a general bond election to upgrade the public schools, the specific charge to the committee was to evaluate the needs for physical plant…

  19. 49 CFR 8.9 - Information Security Review Committee.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Information Security Review Committee. 8.9 Section.../DECLASSIFICATION/ACCESS Classification/Declassification of Information § 8.9 Information Security Review Committee. (a) There is hereby established a Department of Transportation Information Security Review Committee...

  20. Report From the International Linear Collider Technical Review Committee

    International Nuclear Information System (INIS)

    Loew, Gregory A.

    2003-01-01

    The International Linear Collider Technical Review Committee (ILC-TRC), formed in 1994, was reconvened in February 2001 by the International Committee for Future Accelerators (ICFA) to assess the current technical status of all electron-positron linear collider designs at hand in the world: TESLA, JLC-C, JLC-X/NLC and CLIC. The ILC-TRC worked for exactly two years and submitted its report to ICFA in February 2003. This paper presents the motivation behind the study, the charge to the committee and its organization, a table of machine parameters for 500 GeV c.m. energy and later upgrades to higher energies, the methodology used to assess the designs, and a ranked list of R and D tasks still deemed necessary between now and the time any one of the projects is selected by the HEP community and begins construction. Possible future developments are briefly discussed

  1. Pulsed Power Peer Review Committee Report

    International Nuclear Information System (INIS)

    Bloomquist, Douglas D.

    2000-01-01

    In 1993, the Government Performance and Results Act (GPRA, PL 103-62) was enacted. GPRA, which applies to all federal programs, has three components: strategic plans, annual performance plans, and metrics to show how well annual plans are being followed. As part of meeting the GRPA requirement in FY2000, a 14-member external peer review panel (the Garwin Committee) was convened on May 17-19, 2000 to review Sandia National Laboratories' Pulsed Power Programs as a component of the Performance Appraisal Process negotiated with the Department of Energy (DOE). The scope of the review included activities in inertial confinement fission (ICF), weapon physics, development of radiation sources for weapons effects simulation, x-ray radiography, basic research in high energy density physics (HEDP), and pulsed power technology research and development. In his charge to the committee, Jeffrey Quintenz, Director of Pulsed Power Sciences (1600) asked that the review be based on four criteria (1) quality of science, technology, and engineering, (2) programmatic performance, management, and planning, (3) relevance to national needs and agency missions, and (4) performance in the operation and construction of major research facilities. In addition, specific programmatic questions were posed by the director and by the DOE-Defense Programs (DP). The accompanying report, produced as a SAND document, is the report of the committee's findings

  2. Report and recommendations of the Brilliant powerplant expansion project committee

    International Nuclear Information System (INIS)

    2001-01-01

    An application was submitted in December 2000 for a project approval certificate for the Brilliant Powerplant Expansion Project (BEP). It included the construction and operation of a new powerhouse with a generating capacity of close to 100 MW, a new intake and tailrace channels, as well as tailrace channel improvements, a powerhouse access bridge over the Kootenay River downstream from the Brilliant Dam, a 600 metre 230 kV transmission link and 230 kV switchyard (the switchyard is no longer part of the project), a construction site and excavation materials disposal areas, and access to the site from Highway 3A and also from Robson Road. Both before and during the environmental assessment review, comprehensive public consultation was undertaken. The issues that were examined were environmental effects, operations, socio-economic effects, health effects, and the cultural and heritage effects. It was concluded that the effects issues related to the construction of the project had been resolved, based on the information provided in the Application and on the mitigation and compensation measures. The potential impact on fish and fish habitat were examined under the operations heading. Again, the committee determined that the proponent had committed to target minimum flows and restrictions, and that the effects issues associated with the operations of the project had been resolved. Increased traffic through the community of Brilliant represented the main focus of the evaluation of the socio-economic effects. Positive economic and employment effects on local communities were expected, and the proponent was ready to address any potential negative social effects to the satisfaction of the committee. Groundwater resources were the only potentially significant effect identified under the heading health effects, and adequate compensation and mitigation measures were committed by the proponent to address the issue. The cultural and heritage effects identified archaeological

  3. 7 CFR 929.125 - Committee review procedures.

    Science.gov (United States)

    2010-01-01

    ... MASSACHUSETTS, RHODE ISLAND, CONNECTICUT, NEW JERSEY, WISCONSIN, MICHIGAN, MINNESOTA, OREGON, WASHINGTON, AND LONG ISLAND IN THE STATE OF NEW YORK Rules and Regulations § 929.125 Committee review procedures... Committee within 30 days after receipt of the Committee's determination of sales history, a request for a...

  4. ASEAN projects reviewed.

    Science.gov (United States)

    1980-01-01

    The ASEAN Population Expert Group met in Manila and was followed by a meeting of the ASEAN heads of population programs, during the period November 5-10, 1979. Heads of population programs from Indonesia, Malaysia, Singapore, Thailand, and the Philippines attended. The meetings were held to review progress-to-date on phase 1 projects and to consider the development of an expanded population program. 5 projects funded by UNFPA are reviewed in tabular form with the project, the sponsoring country, date of implementation, data analysis, and date of completion. Suggestions were made for improving and extending these projects and it was also suggested that all projects being developed and proposed should include a section on use of research. 7 new projects were proposed as phase 2 projects. The 1st, sponsored by Malaysia, deals with women in development; project 2, lead by Thailand, will investigate population movement and its effect on development; project 3, led by the Philippines, will develop and strengthen national population information systems and networks in ASEAN countries; project 4, led by Indonesia, is directed towards institutional development and exchanges of personnel; project 5, led by the Philippines, will examine population and development dynamics and the man/resources balance; project 6, led by Thailand, will develop ASEAN social indicators; and project 7, led by Indonesia and Malaysia, will make a comprehensive analysis of existing medical/health care and family planning systems. It was recommended that an executive director of the proposed ASEAN population coordination unit should be appointed to expedite the recommendations of the meeting related to preparation and submission of phase 2 project proposals.

  5. Newsletter: work of the Committee and projects funded

    Energy Technology Data Exchange (ETDEWEB)

    1974-12-01

    Information about the work of the Committee is summarized. It has developed a series of project priorities. These are as follows in order of priority: projects that determine current and future energy demand; projects concerned with the conservation and more efficient use of energy; projects concerned with the assessment of indigenous energy resources; projects concerned with the assessment of the human, financial, and organizational resources for increasing energy production and use; projects concerned with economic, technological, and environmental aspects of energy use and production over the next 15 years and beyond the next 15 years. In addition, environmental and sociological projects are considered to be very important. All projects are required to have included consideration of environmental and sociological issues but there may also be specific environmental projects such as the one related to cooling water pond modelling (MCW)

  6. 75 FR 4140 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-01-26

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION... Tax Credit Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public... Advocacy Panel Earned Income Tax Credit Project Committee will be held Wednesday, February 24, 2010, at 1 p...

  7. Review by a local medical research ethics committee of the conduct of approved research projects, by examination of patients' case notes, consent forms, and research records and by interview.

    OpenAIRE

    Smith, T.; Moore, E. J.; Tunstall-Pedoe, H.

    1997-01-01

    OBJECTIVE: To monitor the conduct of medical research projects that have already been approved by the local medical research ethics committee. DESIGN: Follow up study of ethically approved studies (randomly selected from all the studies approved in the previous year) by examination of patients' case notes, consent forms, and research records and by interview of the researchers at their workplace. SETTING: Tayside, Scotland (mixed rural and urban population). SUBJECTS: 30 research projects app...

  8. International Linear Collider Technical Review Committee: Second Report, 2003

    Energy Technology Data Exchange (ETDEWEB)

    Loew, Gregory

    2003-02-21

    As this report is being published, the international high energy physics (HEP) community finds itself confronting a set of fascinating discoveries and new questions regarding the nature of matter and its fundamental particles and forces. The observation of neutrino oscillations that indicates that neutrinos have mass, measurements of the accelerating expansion of the universe that may be due to dark energy, and evidence for a period of rapid inflation at the beginning of the Big Bang are stimulating the entire field. Looming on the horizon are the potential discoveries of a Higgs particle that may reveal the origin of mass and of a whole family of supersymmetric particles that may be part of the cosmic dark matter. For the HEP community to elucidate these mysteries, new accelerators are indispensable. At this time, after careful deliberations, all three regional organizations of the HEP community (ACFA in Asia, HEPAP in North America, and ECFA in Europe) have reached the common conclusion that the next accelerator should be an electron-positron linear collider with an initial center-of-mass energy of 500 Giga-electronvolts (GeV), later upgradable to higher energies, and that it should be built and operated in parallel with the Large Hadron Collider under construction at CERN. Hence, this second report of the International Linear Collider Technical Review Committee (ILC-TRC) comes at a very timely moment. The report was requested by the International Committee on Future Accelerators (ICFA) in February 2001 to assess the current technical status of electron-positron linear collider designs in the various regions. Note that the ILC-TRC was not asked to concern itself with either cost studies or the ultimate selection process of a machine. This Executive Summary gives a short outline of the genesis of the report, the charge given to the committee, and its organization. It then presents a brief description of four electron-positron linear collider designs at hand. The

  9. Committees review activities at December meetings

    Science.gov (United States)

    The Education and Human Resources Committee reported having approved participation in the Association for Women Geoscientist's (AWG) national survey. During the summer of 1983 the AWG designed a 75-question survey targeted to women but also applicable to men. The survey consisted of five sections (in addition to such demographics as age, salary, education, job area, and society membership): feelings and attitude toward job, career/family balance, sexual harassment and discrimination, opinions on national energy and conservation policy, and attitude toward AWG. The questionnaire was mailed to AWG members (just over 1000) and to AGU female members (about 1300). Survey participants were asked to give copies to their male colleagues to create a comparison group. About 25% of the 800 responses were from men. The responses were split about 50/50 between AWG and AGU members. The Education and Human Resources Committee will have the results from the survey presented at their next meeting in Cincinnati, May 15.

  10. 76 FR 29722 - Elko Resource Advisory Committee

    Science.gov (United States)

    2011-05-23

    ... (Pub. L. 110-343) (the Act) and operates in compliance with the Federal Advisory Committee Act. The...- Determination Act; (2) Review roles of RAC committee members and Committee Chairman; (3) Overview of project...

  11. LBNL report of the vetting review of the GRETINA project

    International Nuclear Information System (INIS)

    Robinson, K.E.; Bercovitz, J.H.; Bieser, F.S.; Jared, R.C.; Karpenko, V.P.; Klein, S.R.; Lesko, K.T.; Rasson, J.E.; Ritter, H.G.; Tull, C.E.; Wells, R.; Wieman, H.H.

    2004-01-01

    GRETINA is a gamma-ray detector array capable of reconstructing the energy and spatial positions of gamma-ray interactions within the germanium crystals. It will be used to study the structure and stability of nuclei under various conditions. The new capabilities provided by gamma-ray tracking will give large gains in sensitivity for a large number of experiments, particularly those aimed at nuclei far from beta stability. A proposal for GRETINA was submitted to DOE in June 2003. It presented the scientific case, the readiness of technical development, the design, the suggested management organizations, and a proposed cost and schedule. The GRETINA proposal received its CD0 approval in August 2003. The CD-1 review will be held on December 3 and 4, 2003, and will be handled by the DOE-N. This report presents the charge to the GRETINA vetting review committee, and the findings, comments and recommendations of this committee. The purpose of this project vetting review was to assure that the GRETINA project is on track to provide DOE and the nuclear physics community with the agreed upon deliverables within the agreed upon budget and schedule. The vetting review committee was asked to cover both technical and management aspects of the GRETINA Project. Reviewers offer expert knowledge in relevant areas and provide recommendations and findings to the project's management team. Upon successful completion, the Laboratory's Integrated Project Management Office (IPMO) will recommend signoff of the project to the Laboratory Directorate. The GRETINA vetting review committee was asked to consider all relevant aspects of the project's management, project execution plan (PEP), technical approach and status, cost estimate, resources, schedule and risk and, in doing so, to advise as to whether the GRETINA Project was likely to successfully provide the agreed upon deliverables within the agreed upon budget and schedule. The review committee was asked to identify any project areas

  12. Regional Infant and Child Mortality Review Committee--2011 final report.

    Science.gov (United States)

    Wilson, Ann L; Sideras, James

    2012-12-01

    The 2011 annual report of the Regional Infant and Child Mortality Review Committee (RICMRC) is presented. Since 1997, the committee has reviewed 224 deaths to achieve its mission to "review infant and child deaths so that information can be transformed into action to protect young lives." In 2011, the committee reviewed 21 deaths (22 met the committee's criteria) of infants and children who were residents of Minnehaha, Turner, Lincoln, Hanson and Brookings counties in South Dakota. The manner of 12 of the reviewed deaths was natural with eight of these the result of progressive neurological diseases or conditions. In 2011 there were no deaths attributed to Sudden Infant Death Syndrome (SIDS), though there were two deaths of infants during sleep. One of these infants was ruled accidental as the baby died of aspiration and the other death occurred in an unsafe environment with its manner determined to be undecided. Six deaths were accidental, one of which occurred as a result of a fire in a home without functional smoke alarms. One motor vehicle death occurred, through no fault of the teen age driver. Another death resulted from tubing over a low head dam on the Big Sioux River. One youth suicide occurred to a resident of the region.

  13. Increasing women's leadership in academic medicine: report of the AAMC Project Implementation Committee.

    Science.gov (United States)

    Bickel, Janet; Wara, Diane; Atkinson, Barbara F; Cohen, Lawrence S; Dunn, Michael; Hostler, Sharon; Johnson, Timothy R B; Morahan, Page; Rubenstein, Arthur H; Sheldon, George F; Stokes, Emma

    2002-10-01

    The AAMC's Increasing Women's Leadership Project Implementation Committee examined four years of data on the advancement of women in academic medicine. With women comprising only 14% of tenured faculty and 12% of full professors, the committee concludes that the progress achieved is inadequate. Because academic medicine needs all the leaders it can develop to address accelerating institutional and societal needs, the waste of most women's potential is of growing importance. Only institutions able to recruit and retain women will be likely to maintain the best housestaff and faculty. The long-term success of academic health centers is thus inextricably linked to the development of women leaders. The committee therefore recommends that medical schools, teaching hospitals, and academic societies (1) emphasize faculty diversity in departmental reviews, evaluating department chairs on their development of women faculty; (2) target women's professional development needs within the context of helping all faculty maximize their faculty appointments, including helping men become more effective mentors of women; (3) assess which institutional practices tend to favor men's over women's professional development, such as defining "academic success" as largely an independent act and rewarding unrestricted availability to work (i.e., neglect of personal life); (4) enhance the effectiveness of search committees to attract women candidates, including assessment of group process and of how candidates' qualifications are defined and evaluated; and (5) financially support institutional Women in Medicine programs and the AAMC Women Liaison Officer and regularly monitor the representation of women at senior ranks.

  14. Centers for manufacturing technology: Industrial Advisory Committee Review

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    An advisory committee, composed of senior managers form industrial- sector companies and major manufacturing trade associations and representatives from appropriate educational institutions, meets semi-annually to review and advise the Oak Ridge Centers for Manufacturing Technology (ORCMT) on its economic security program. Individual papers have been indexed separately for the database.

  15. 15 CFR 2008.19 - Classification Review Committee.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Classification Review Committee. 2008.19 Section 2008.19 Commerce and Foreign Trade Regulations Relating to Foreign Trade Agreements OFFICE OF THE UNITED STATES TRADE REPRESENTATIVE REGULATIONS TO IMPLEMENT E.O. 12065; OFFICE OF THE UNITED...

  16. International Linear Collider Technical Review Committee Report, 1995

    International Nuclear Information System (INIS)

    1995-12-01

    This 1995 report of the International Linear Collider Technical Review Committee is the first attempt to gather in one document the current status of all major e + e - linear collider projects in the world. The report is the result of a collaborative effort of scientists from many laboratories working together over a period of about one year. A short description of the organization, origins and history of the report is given below. To get an idea of the organization, the reader should first refer to the Table of Contents. Chapter 1 is an introduction and general overview of the respective 500 GeV c.m. energy machines. In contrast, Chapter 2, cutting across individual machine boundaries, gives a comparative description and discussion of all the major machine sub-systems as well as particle physics experimentation, showing where these subjects stand today and what additional work needs to be done in the next few years to reach the point where complete design reports can be prepared. Chapter 3 describes the various paths to energy upgrades, and other experimental options (γγ, e - e - , etc.). Chapter 4 gives a short status report of the machine experiments and test facilities being built in the world. Chapter 5 outlines current and other possible areas of collaboration and finally., Chapter 6 summarizes our principal conclusions

  17. 76 FR 10944 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-02-28

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee will be held Tuesday...

  18. 76 FR 45006 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-07-27

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Panel Earned Income Tax Credit Project Committee will be held Monday, September 26, 2011, at 3 p.m...

  19. 76 FR 56879 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-09-14

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Earned Income Tax Credit Project Committee will be held Monday, October 24, 2011, at 3 p.m. Eastern Time...

  20. 75 FR 47349 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-08-05

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Income Tax Credit Project Committee will be held Wednesday, September 22, 2010, at 1 p.m. Eastern Time...

  1. 75 FR 62632 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-10-12

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Income Tax Credit Project Committee will be held Wednesday, November 24, 2010, at 1 p.m. Eastern Time via...

  2. 75 FR 39333 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-07-08

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Income Tax Credit Project Committee will be held Wednesday, August 25, 2010, at 1 p.m. Eastern Time via...

  3. 76 FR 63716 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-10-13

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Earned Income Tax Credit Project Committee will be held Monday, November 28, 2011, at 3 p.m. Eastern Time...

  4. 76 FR 37199 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-06-24

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Income Tax Credit Project Committee will be held Monday, August 22, 2011, at 3 p.m. Eastern Time via...

  5. 75 FR 55406 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-09-10

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Income Tax Credit Project Committee will be held Wednesday, October 27, 2010, at 1:00 p.m. Eastern Time...

  6. 76 FR 6188 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-02-03

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Panel Earned Income Tax Credit Project Committee will be held Monday, March 28, 2011, at 2 p.m., Eastern...

  7. Poverty alleviation project review

    CSIR Research Space (South Africa)

    Braun, AL

    2003-01-01

    Full Text Available seven pure cashmere rams from project. EC (Emerging farmers) farmers have also received 43 upgraded cashmere rams from Dept. of Agric. EC From the plus minus 1800 goats involved in the project at least 450 kids / offspring of the improved goats have been...

  8. The Evolution of American Hospital Ethics Committees: A Systematic Review.

    Science.gov (United States)

    Courtwright, Andrew; Jurchak, Martha

    2016-01-01

    During the 1970s and 1980s, legal precedent, governmental recommendations, and professional society guidelines drove the formation of hospital ethics committees (HECs). The Joint Commission on Accreditation of Health Care Organization's requirements in the early 1990s solidified the role of HECs as the primary mechanism to address ethical issues in patient care. Because external factors drove the rapid growth of HECs on an institution-by-institution basis, however, no initial consensus formed around the structure and function of these committees. There are now almost 40 years of empirical studies on the composition, administration, and activities of HECs in the United States. We conducted a systematic review of the available empirical literature on HECs to describe their evolution. As HECs changed over time, they increased their total number of members and percentage of members from nursing and the community. Although physicians increasingly chaired these committees, their presence as a percentage of overall members declined. The percentage of administrative members remained steady, although committees became increasingly likely to have at least one administrative member. HECs were also increasingly likely to report to an administrative body or to the board of trustees or directors rather than to the medical staff. Finally, consultation volume increased steadily over time. There has not, however, been a national survey of the composition of ethics committees, their administration, or volume of consultation in more than 10 years, despite increasing calls for professional standards and quality improvement assessments among HECs. Copyright 2016 The Journal of Clinical Ethics. All rights reserved.

  9. Report of the Review Committee of the R and D subjects on Computational Science and Engineering

    International Nuclear Information System (INIS)

    1999-08-01

    The Ad Hoc Review Committee composed of seven experts was set up under the Research Evaluation Committee of JAERI in order to review the R and D subjects to be implemented for five years starting in a 2000 fiscal year at the Center for promotion of Computational Science and Engineering. The review meeting took place on April 26, 1999. According to the review methods consisting of review items, points of review and review criteria given by the Research Evaluation Committee, the review was conducted based on the materials submitted in advance and presentations of CCSE. The Research Evaluation Committee received the review report and its explanations from the Review Committee on July 5. The Research Evaluation Committee has acknowledged appropriateness of the review results. This report describes the review results. (author)

  10. Report of the review committee on evaluation of the R and D subjects in the field of high-temperature engineering and research

    International Nuclear Information System (INIS)

    2000-09-01

    On the basis of the JAERI's Basic Guidelines for the Research Evaluation Methods and the Practices Manuals of the Institution Evaluation Committee and Research Evaluation Committee, the Ad Hoc Review Committee on High-Temperature Engineering and Research composed of nine experts was set up under the Research Evaluation Committee of the JAERI in order to review the R and D subjects to be implemented for five years starting in FY 2000 in the Departments of HTTR Project and Advanced Nuclear Heat Technology. The Ad Hoc Review Committee meeting was held on December 27, 1999. According to the review methods including review items, points of review and review criteria, determined by the Research Evaluation Committee, the review was conducted based on the research plan documents submitted in advance and presentations by the Department Directors. The review report was submitted to the Research Evaluation Committee for further review and discussions in its meeting held on August 31, 2000. The Research Evaluation Committee recognized the review results as appropriate. This report describes the review results. (author)

  11. Report of the US Nuclear Regulatory Commission Piping Review Committee. Volume 5. Summary - Piping Review Committee conclusions and recommendations

    International Nuclear Information System (INIS)

    1985-04-01

    This document summarizes a comprehensive review of NRC requirements for Nuclear Piping by the US NRC Piping Review Committee. Four topical areas, addressed in greater detail in Volumes 1 through 4 of this report, are included: (1) Stress Corrosion Cracking in Piping of Boiling Water Reactor Plants; (2) Evaluation of Seismic Design; (3) Evaluation of Potential for Pipe Breaks; and (4) Evaluation of Other Dynamic Loads and Load Combinations. This volume summarizes the major issues, reviews the interfaces, and presents the Committee's conclusions and recommendations for updating NRC requirements on these issues. This report also suggests research or other work that may be required to respond to issues not amenable to resolution at this time

  12. Report of the first meeting of the Project Advisory Committee (Technical) 21-24 March 1983, at NEMROCK, Cairo

    International Nuclear Information System (INIS)

    Taylor, C.B.G.

    1983-05-01

    The Project Advisory Committee (Technical) (PACT) met on 21-24 March 1983, at NEMROCK, Cairo, Egypt, to discuss the joint IAEA/WHO project on Intracavitary Radiation Therapy for Cancer of the Uterus (Egypt/6/004). At this four day meeting the committee (1) identified a well-defined administrative framework in which earlier diagnosis of uterine cancer may be organized, on a limited but firm basis. (2) Agreed on the clinical and dosimetric principles to be followed in implementing the project. (3) Decided on the types and quantities of equipment which it will need in its first two years. (4) Developed the outline of the syllabus for the first training course, and fixed its date (three weeks from 83-10-29). (5) Reviewed the costs which will be incurred in carrying through the project and found them to be consistent with the funds available

  13. Baseline review of the U.S. LHC Accelerator project

    International Nuclear Information System (INIS)

    1998-02-01

    The Department of Energy (DOE) Review of the U.S. Large Hadron Collider (LHC) Accelerator project was conducted February 23--26, 1998, at the request of Dr. John R. O'Fallon, Director, Division of High Energy Physics, Office of Energy Research, U.S. DOE. This is the first review of the U.S. LHC Accelerator project. Overall, the Committee found that the U.S. LHC Accelerator project effort is off to a good start and that the proposed scope is very conservative for the funding available. The Committee recommends that the project be initially baselined at a total cost of $110 million, with a scheduled completion data of 2005. The U.S. LHC Accelerator project will supply high technology superconducting magnets for the interaction regions (IRs) and the radio frequency (rf) straight section of the LHC intersecting storage rings. In addition, the project provides the cryogenic support interface boxes to service the magnets and radiation absorbers to protect the IR dipoles and the inner triplet quadrupoles. US scientists will provide support in analyzing some of the detailed aspects of accelerator physics in the two rings. The three laboratories participating in this project are Brookhaven National Laboratory, Fermi National Accelerator Laboratory (Fermilab), and Lawrence Berkeley National Laboratory. The Committee was very impressed by the technical capabilities of the US LHC Accelerator project team. Cost estimates for each subsystem of the US LHC Accelerator project were presented to the Review Committee, with a total cost including contingency of $110 million (then year dollars). The cost estimates were deemed to be conservative. A re-examination of the funding profile, costs, and schedules on a centralized project basis should lead to an increased list of deliverables. The Committee concluded that the proposed scope of US deliverables to CERN can be readily accomplished with the $110 million total cost baseline for the project. The current deliverables should serve as

  14. Safety Review Committee - Annual Report 1991-1992

    International Nuclear Information System (INIS)

    1993-01-01

    During the year under review. The Safety Review Committee (SRC) assessed the safety of ANSTO's operations. This was done by site visits, examination of documentation and briefing by ANSTO officers responsible for particular operations, and includes HIFAR and Moata reactors, radioisotope production, packing and dispatch, radioactive waste management practices, occupational health and safety activities and ANSTO's arrangements for public health and safety beyond the site. This report describes the activities and findings of the SRC during the year ending 30 June 1992. 8 figs., ills

  15. Report of the evaluation by the Ad Hoc Review Committee on High-Temperature Engineering and Research. Result evaluation in fiscal year 2000

    International Nuclear Information System (INIS)

    2001-06-01

    The Research Evaluation Committee, which consisted of 14 members from outside of the Japan Atomic Energy Research Institute (JAERI), set up an Ad Hoc Review Committee on High-Temperature Engineering and Research in accordance with the 'Fundamental Guideline for the Evaluation of Research and Development (R and D) at JAERI' and its subsidiary regulations in order to evaluate the R and D accomplishments achieved for five years from Fiscal Year 1995 to Fiscal Year 1999 at Department of HTTR Project and Department of Advanced Nuclear Heat Technology in Oarai Research Establishment of JAERI. The Ad Hoc Review Committee consisted of nine specialists from outside of JAERI. The Ad Hoc Review Committee conducted its activities from December 2000 to February 2001. The evaluation was performed on the basis of the materials submitted in advanced and of the oral presentations made at the Ad Hoc Review Committee meeting which was held on December 8, 2000, in line with the items, viewpoints, and criteria for the evaluation specified by the Research Evaluation Committee. The result of the evaluation by the Ad Hoc Review Committee was submitted to the Research Evaluation Committee, and was judged to be appropriate at its meeting held on March 16, 2001. This report describes the result of the evaluation by the Ad Hoc Review Committee on High-Temperature Engineering and Research. (author)

  16. Lapse in Institutional Animal Care and Use Committee Continuing Reviews.

    Directory of Open Access Journals (Sweden)

    Min-Fu Tsan

    Full Text Available The United States federal animal welfare regulations and the Public Health Service Policy on Humane Care and Use of Laboratory Animals require that institutional animal care and use committees (IACUCs conduct continuing reviews of all animal research activities. However, little is known about the lapse rate of IACUC continuing reviews, and how frequently investigators continue research activities during the lapse. It is also not clear what factors may contribute to an institution's lapse in IACUC continuing reviews. As part of the quality assurance program, the Department of Veterans Affairs (VA has collected performance metric data for animal care and use programs since 2011. We analyzed IACUC continuing review performance data at 74-75 VA research facilities from 2011 through 2015. The IACUC continuing review lapse rates improved from 5.6% in 2011 to 2.7% in 2015. The rate of investigators continuing research activities during the lapse also decreased from 47.2% in 2012 to 7.4% in 2015. The type of IACUCs used and the size of animal research programs appeared to have no effect in facility's rates of lapse in IACUC continuing reviews. While approximately 80% of facilities reported no lapse in IACUC continuing reviews, approximately 14% of facilities had lapse rates of >10% each year. Some facilities appeared to be repeat offenders. Four facilities had IACUC lapse rates of >10% in at least 3 out of 5 years, suggesting a system problem in these facilities requiring remedial actions to improve their IACUC continuing review processes.

  17. 75 FR 17953 - Native American Graves Protection and Repatriation Review Committee Findings Related to the...

    Science.gov (United States)

    2010-04-08

    ... Repatriation Review Committee Findings Related to the Identity of Cultural Items in the Possession of the.... 3006(c)(3)), reviewed the record and made findings of fact related to the identity of 45 cultural items... Review Committee found that each of the 45 cultural items was both a ``sacred object'' (25 U.S.C. 3001(3...

  18. Congressional hearing reviews NSF major research and facilities projects

    Science.gov (United States)

    Showstack, Randy

    2012-03-01

    An 8 March congressional hearing about the U.S. National Science Foundation's Major Research Equipment and Facilities Construction (NSF MREFC) account focused on fiscal management and accountability of projects in that account and reviewed concerns raised by NSF's Office of Inspector General (OIG). NSF established the MREFC account in 1995 to better plan and manage investments in major equipment and facilities projects, which can cost from tens of millions to hundreds of millions of dollars, and the foundation has funded 17 MREFC projects since then. The Obama administration's proposed fiscal year (FY) 2013 budget includes funding for four MREFC projects: Advanced Laser Gravitational-Wave Observatory (AdvLIGO), Advanced Technology Solar Telescope (ATST), National Ecological Observatory (NEON), and Ocean Observatories Initiative (OOI). The hearing, held by a subcommittee of the House of Representatives' Committee on Science, Space, and Technology, reviewed management oversight throughout the life cycles of MREFC projects and concerns raised in recent OIG reports about the use of budget contingency funds. NSF's February 2012 manual called "Risk management guide for large facilities" states that cost contingency is "that portion of the project budget required to cover `known unknowns,'" such as planning and estimating errors and omissions, minor labor or material price fluctuations, and design developments and changes within the project scope. Committee members acknowledged measures that NSF has made to improve the MREFC oversight process, but they also urged the agency to continue to take steps to ensure better project management.

  19. 42 CFR 61.15 - Moral character or loyalty; reference to Special Review Committee; review and recommendation.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Moral character or loyalty; reference to Special... § 61.15 Moral character or loyalty; reference to Special Review Committee; review and recommendation. (a) Moral character or loyalty; reference to Special Review Committee. Whenever the Surgeon General...

  20. Current projects of the National Wind Coordinating Committee

    Energy Technology Data Exchange (ETDEWEB)

    Rhoads, H. [National Wind Coordinating Committee, Washington, DC (United States)

    1997-12-31

    This paper summarizes the activities of the National Wind Coordinating Committee (NWCC), a multi-stakeholder collaborative formed in 1994 to support the responsible use of wind power in the USA. The NWCC`s vision is a self-sustaining commercial market for wind power - environmentally, economically, and politically sustainable. Current NWCC activities include: outreach initiatives, disseminating information about wind energy to regulators and legislators through the Wind Energy Issue Paper Series, researching distributed wind energy models, producing a wind facility permitting handbook, improving avian research, addressing transmission and resource assessment issues, and exploring sustainable development and marketing approaches.

  1. 15 CFR 2002.1 - Trade Policy Committee Review Group.

    Science.gov (United States)

    2010-01-01

    ... OFFICE OF THE UNITED STATES TRADE REPRESENTATIVE OPERATION OF COMMITTEES § 2002.1 Trade Policy Committee..., December 11, 1971 (15 CFR 2002.1), is abolished and there is hereby established as a subordinate body of...

  2. [Responsibilities of ethics committees].

    Science.gov (United States)

    von Bergmann, K

    2000-05-01

    Increasing numbers of clinical research projects are submitted to ethical committees (institutional review boards) for approval. New therapeutic developments have to be evaluated by these committees to protect patients/volunteers. Thus, the responsibility of ethical committees is increasing. The "Nürnberger Kodex" and the "Declaration of Helsinki" are the background for these evaluations. According to the German drug law the physician is obligated by law to submit the protocol to such a committee. In addition, local state physician authorities require such a procedure. Important considerations during the review process besides ethical aspects are the informed consent, which should be written in an understandable form, and the obligations of the insurance.

  3. The NIH Cognitive and Emotional Health Project. Report of the Critical Evaluation Study Committee.

    Science.gov (United States)

    Hendrie, Hugh C; Albert, Marilyn S; Butters, Meryl A; Gao, Sujuan; Knopman, David S; Launer, Lenore J; Yaffe, Kristine; Cuthbert, Bruce N; Edwards, Emmeline; Wagster, Molly V

    2006-01-01

    The Cognitive and Emotional Health Project (CEHP) seeks to identify the demographic, social, and biological determinants of cognitive and emotional health in the older adult. As part of the CEHP, a critical evaluation study committee was formed to assess the state of epidemiological research on demographic, social, and biological determinants of cognitive and emotional health. Criteria for inclusion in the survey were large cohort studies, longitudinal in design, participants predominantly 65 years or older, with measurements of both cognition and emotion, and information on a wide variety of demographic, psychosocial, and biological factors. North American and European studies, which met these criteria, were selected for the review. Outcome measures included cognition, cognitive decline, and cognitive function. For emotion, symptoms included depression and anxiety, positive and negative affect, subjective well being, mastery, and resilience. Ninety-six papers were identified that addressed cognitive and emotional outcomes. A large variety of risk factors were consistently identified with cognitive outcomes, particularly those previously associated with increased risk of cardiovascular disease. There was considerable overlap between risk factors for cognitive and emotional outcomes. This review identifies a large number of lifestyle and health behaviors that alter the risk for maintenance of cognitive and emotional health. Large longitudinal cohort studies are a unique source to explore factors associated with cognitive and emotional health. Secondary analyses of these studies should be encouraged as should the development of standardized questionnaires to measure cognitive and emotional health. Future research in this field should study cognitive and emotional health simultaneously.

  4. Department of Energy review of the National Spallation Neutron Source Project

    International Nuclear Information System (INIS)

    1997-06-01

    A Department of Energy (DOE) review of the Conceptual Design Report (CDR) for the National Spallation Neutron Source (NSNS) was conducted. The NSNS will be a new high-power spallation neutron source; initially, it will operate at 1 megawatt (MW), but is designed to be upgradeable to significantly higher power, at lower cost, when accelerator and target technologies are developed for higher power. The 53-member Review Committee examined the projected cost, schedule, technical scope, and management structure described in the CDR. For each of the major components of the NSNS, the Committee determined that the project team had produced credible designs that can be expected to work well. What remains to be done is to integrate the design of these components. With the exception of the liquid mercury target, the NSNS Project will rely heavily on proven technologies and, thus, will face a relatively low risk to successful project completion. The Total Project Cost (TPC) presented to the Committee in the CDR was $1.266 billion in as-spent dollars. In general, the Committee felt that the laboratory consortium had presented a credible estimate for each of the major components but that value engineering might produce some savings. The construction schedule presented to the Committee covered six years beginning in FY 1999. The Committee questioned whether all parts of the project could be completed according to this schedule. In particular, the linac and the conventional facilities appeared to have overly optimistic schedules. The NSNS project team was encouraged to reexamine these activities and to consider a more conservative seven-year schedule. Another concern of the Committee was the management structure. In summary, the Committee felt that this Conceptual Design Report was a very credible proposal, and that there is a high probability for successful completion of this major project within the proposed budget, although the six-year proposed schedule may be optimistic

  5. Department of Energy review of the National Spallation Neutron Source Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    A Department of Energy (DOE) review of the Conceptual Design Report (CDR) for the National Spallation Neutron Source (NSNS) was conducted. The NSNS will be a new high-power spallation neutron source; initially, it will operate at 1 megawatt (MW), but is designed to be upgradeable to significantly higher power, at lower cost, when accelerator and target technologies are developed for higher power. The 53-member Review Committee examined the projected cost, schedule, technical scope, and management structure described in the CDR. For each of the major components of the NSNS, the Committee determined that the project team had produced credible designs that can be expected to work well. What remains to be done is to integrate the design of these components. With the exception of the liquid mercury target, the NSNS Project will rely heavily on proven technologies and, thus, will face a relatively low risk to successful project completion. The Total Project Cost (TPC) presented to the Committee in the CDR was $1.266 billion in as-spent dollars. In general, the Committee felt that the laboratory consortium had presented a credible estimate for each of the major components but that value engineering might produce some savings. The construction schedule presented to the Committee covered six years beginning in FY 1999. The Committee questioned whether all parts of the project could be completed according to this schedule. In particular, the linac and the conventional facilities appeared to have overly optimistic schedules. The NSNS project team was encouraged to reexamine these activities and to consider a more conservative seven-year schedule. Another concern of the Committee was the management structure. In summary, the Committee felt that this Conceptual Design Report was a very credible proposal, and that there is a high probability for successful completion of this major project within the proposed budget, although the six-year proposed schedule may be optimistic.

  6. 76 FR 45004 - Open Meeting of the Taxpayer Advocacy Panel Volunteer Income Tax Assistance Project Committee

    Science.gov (United States)

    2011-07-27

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Volunteer Income Tax Assistance Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Volunteer Income Tax...

  7. 77 FR 67735 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee

    Science.gov (United States)

    2012-11-13

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of Meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and Publications...

  8. 78 FR 78516 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee.

    Science.gov (United States)

    2013-12-26

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee. AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of Meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and Publications...

  9. 76 FR 45007 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee

    Science.gov (United States)

    2011-07-27

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and Publications...

  10. 78 FR 41193 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee

    Science.gov (United States)

    2013-07-09

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and Publications...

  11. 76 FR 22171 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-04-20

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  12. 76 FR 32024 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-06-02

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of Meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  13. 75 FR 33894 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-06-15

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  14. 76 FR 2197 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee.

    Science.gov (United States)

    2011-01-12

    ... Earned Income Tax Credit Project Committee. AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  15. 75 FR 7540 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-02-19

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  16. 76 FR 17995 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2011-03-31

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  17. 75 FR 18955 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee.

    Science.gov (United States)

    2010-04-13

    ... Earned Income Tax Credit Project Committee. AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  18. 75 FR 25316 - Open Meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit Project Committee

    Science.gov (United States)

    2010-05-07

    ... Earned Income Tax Credit Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit... Act, 5 U.S.C. App. (1988) that an open meeting of the Taxpayer Advocacy Panel Earned Income Tax Credit...

  19. 75 FR 33893 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-06-15

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  20. 75 FR 55405 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-09-10

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  1. 75 FR 18957 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-04-13

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  2. 75 FR 47348 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-08-05

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  3. 75 FR 62630 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-10-12

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  4. 75 FR 7539 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-02-19

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  5. 75 FR 11999 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-03-12

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  6. 75 FR 39331 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-07-08

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  7. 75 FR 4140 - Open Meeting of the Taxpayer Advocacy Panel Small Business/Self Employed Project Committee

    Science.gov (United States)

    2010-01-26

    ... Small Business/Self Employed Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Small Business/ Self Employed Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  8. 77 FR 37101 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-06-20

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  9. 77 FR 61053 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-10-05

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods... Service Methods Project Committee will be held Tuesday, November 13, 2012, at 2:00 p.m. Eastern Time via...

  10. 77 FR 47166 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-08-07

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods... Service Methods Project Committee will be held Tuesday, September 11, 2012, at 2 p.m. Eastern Time via...

  11. 77 FR 8328 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-02-14

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods... Panel Face-to-Face Service Methods Project Committee will be held Tuesday, March 13, 2012, at 2 p.m...

  12. 76 FR 78342 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2011-12-16

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of Meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods... Service Methods Project Committee will be held Tuesday, January 10, 2012, at 2 p.m. Eastern Time via...

  13. 77 FR 2611 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-01-18

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods... Service Methods Project Committee will be held Tuesday, February 14, 2012, at 2 p.m. Eastern Time via...

  14. 77 FR 40411 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-07-09

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  15. 77 FR 21157 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-04-09

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  16. 77 FR 55525 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-09-10

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and...

  17. Project risk management: A review of an institutional project life cycle

    Directory of Open Access Journals (Sweden)

    Wanjiru Gachie

    2017-11-01

    Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects

  18. Report on the second meeting of the project advisory committee (technical) for IAEA/WHO project EGY/6/004 (Egyptian Cancer Project) 3-9 April 1984, at NEMROCK, Cairo

    International Nuclear Information System (INIS)

    Taylor, C.G.B.

    1984-07-01

    The purpose of the meeting was to review the first year's work and make recommendations for the future. The Committee dealt mainly with the Training Course, the selection of cases suitable for treatment by simple means, the revision of treatment notes and protocols, planning for the cytology (early diagnosis) programme, the collection and manipulation of data, the extension of the Project in Egypt, and its possible extension to other countries

  19. Assessment of the Jabiluka Project - Report of the Supervising Scientist to the World heritage Committee. Supervising Scientist report 138

    International Nuclear Information System (INIS)

    Johnston, A.; Prendergast, J.B.

    1999-01-01

    This report has been prepared in response to the request of the World Heritage Committee that the Supervising Scientist conduct a full review of scientific issues raised by the Committee's Mission to Kakadu National Park in October-November 1998. Perceived scientific uncertainty with respect to these issues had led to the Mission's conclusion that the natural values of Kakadu are threatened by the Jabiluka project. This detailed review has demonstrated that there were a number of weaknesses in the hydrological modelling presented by ERA in the EIS and the PER. Accordingly, a number of recommendations have been made which should be implemented by ERA in completing the detailed design of the Jabiluka project. On the other hand, the review has demonstrated quite clearly that, if the design of the water management system proposed by ERA in the PER had been implemented, the risk to the wetlands of Kakadu National Park, and the risk of radiation exposure to people of the region would have been extremely low. This conclusion is valid even in extreme circumstances leading to the complete failure of the structure of the water retention pond at Jabiluka. Copyright (2000) Commonwealth of Australia

  20. Summary of discussion points and further deliberations in the special committee on the ITER project in the Atomic Energy Commission

    International Nuclear Information System (INIS)

    Nakamura, H.

    1998-01-01

    Discussion points and further deliberations in the Special Committee, which was established in December 1996 on the ITER Project were: 'Global environment problem and energy problem', 'Promotion of the fusion energy development' and 'ITER Project'

  1. Report of the Review Committee on valuation of the research subjects in the fields of advanced science research

    International Nuclear Information System (INIS)

    2000-07-01

    On the basis of the JAERI's Basic Guidelines for the Research Evaluation Methods, etc. the Ad Hoc Review Committee composed of eight experts was set up under the Research Evaluation Committee of the JAERI in order to review the research theme completed in FY1998 and those planned for five years starting in FY2000 in the Advanced Science Research Center. The Ad Hoc Review Committee meeting was held on September 17, 1999. According to the review methods including review items, points of review and review criteria, determined by the Research Evaluation Committee, the review was conducted based on the research results/plan documents submitted in advance and presentations by the Research Group Leaders. The review report was submitted to the Research Evaluation Committee for further review and discussions in its meeting held on March 14, 2000. As a result, the Research Evaluation Committee acknowledged appropriateness of the review results. This report describes the review results. (author)

  2. Committees

    Science.gov (United States)

    2012-11-01

    Leadership Team of the IAHR Committee for Hydraulic Machinery and Systems Eduard EGUSQUIZA, UPC Barcelona, Spain, Chair François AVELLAN, EPFL-LMH, Switzerland, Past Chair Richard K FISHER, Voith Hydro Inc., USA, Past Chair Fidel ARZOLA, Edelca, Venezuela Michel COUSTON, Alstom Hydro, France Niklas DAHLBÄCKCK, Vatenfall, Sweden Normand DESY, Andritz VA TECH Hydro Ltd., Canada Chisachi KATO, University of Tokyo, Japan Andrei LIPEJ, Turboinstitut, Slovenija Torbjørn NIELSEN, NTNU, Norway Romeo SUSAN-RESIGA, 'Politehnica' University Timisoara, Romania Stefan RIEDELBAUCH, Stuggart University, Germany Albert RUPRECHT, Stuttgart University, Germany Qing-Hua SHI, Dong Fang Electrical Machinery Co., China Geraldo TIAGO, Universidade Federal de Itajubá, Brazil International Advisory Committee Shouqi YUAN (principal) Jiangsu University China QingHua SHI (principal) Dong Fang Electrical Machinery Co. China Fidel ARZOLA EDELCA Venezuela Thomas ASCHENBRENNER Voith Hydro GmbH & Co. KG Germany Anton BERGANT Litostroj Power doo Slovenia B C BHAOYAL Research & Technology Centre India Hermod BREKKE NTNU Norway Stuart COULSON Voith Hydro Inc. USA Paul COOPER Fluid Machinery Research Inc USA V A DEMIANOV Power Machines OJSC Russia Bart van ESCH Technische Universiteit Eindhoven Netherland Arno GEHRER Andritz Hydro Graz Austria Akira GOTO Ebara Corporation Japan Adiel GUINZBURG The Boeing Company USA D-H HELLMANN KSB AG Germany Ashvin HOSANGADI Combustion Research and Flow Technology USA Byung-Sun HWANG Korea Institute of Material Science Korea Toshiaki KANEMOTO Kyushu Institute of Technology Japan Mann-Eung KIM Korean Register of Shipping Korea Jiri KOUTNIK Voith Hydro GmbH & Co. KG Germany Jinkook LEE Eaton Corporation USA Young-Ho LEE Korea Maritime University Korea Woo-Seop LIM Hyosung Goodsprings Inc Korea Jun MATSUI Yokohama National University Japan Kazuyoshi Mitsubishi H I Ltd, Japan MIYAGAWA Christophe NICOLET Power Vision Engineering Srl Switzerland Maryse PAGE Hydro

  3. 18 CFR 801.4 - Project review.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Project review. 801.4 Section 801.4 Conservation of Power and Water Resources SUSQUEHANNA RIVER BASIN COMMISSION GENERAL POLICIES § 801.4 Project review. (a) The Compact provides generally that no project affecting the water...

  4. Researchers' experience with project management in health and medical research: Results from a post-project review

    Science.gov (United States)

    2011-01-01

    Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721

  5. Integer Linear Programming for Constrained Multi-Aspect Committee Review Assignment

    Science.gov (United States)

    Karimzadehgan, Maryam; Zhai, ChengXiang

    2011-01-01

    Automatic review assignment can significantly improve the productivity of many people such as conference organizers, journal editors and grant administrators. A general setup of the review assignment problem involves assigning a set of reviewers on a committee to a set of documents to be reviewed under the constraint of review quota so that the reviewers assigned to a document can collectively cover multiple topic aspects of the document. No previous work has addressed such a setup of committee review assignments while also considering matching multiple aspects of topics and expertise. In this paper, we tackle the problem of committee review assignment with multi-aspect expertise matching by casting it as an integer linear programming problem. The proposed algorithm can naturally accommodate any probabilistic or deterministic method for modeling multiple aspects to automate committee review assignments. Evaluation using a multi-aspect review assignment test set constructed using ACM SIGIR publications shows that the proposed algorithm is effective and efficient for committee review assignments based on multi-aspect expertise matching. PMID:22711970

  6. Report of the Review Committee on the BNL colliding beam accelerator

    International Nuclear Information System (INIS)

    1983-01-01

    The Colliding Beam Accelerator (CBA) proposal by BNL for a pp collider of 400 GeV /times/ 400 GeV with a maximum luminosity /Brit pounds/ = 2 /times/ 10 33 was reviewed by a DOE team, including consultants, on April 11--15, 1983. No major flaws were found that would prevent, in principle, the proposed collider from reaching its design goals. BNL has made sufficient progress in their superconducting magnet RandD program that, although there is not yet a magnet of the CBA baseline design, the Committee believes the design can be achieved. However, to ensure prompt completion of the project, substantial RandD needs to be carried out in short order, particularly on the timely and cost-effective production of magnets, reliability of quench protection, and determination of cryogenic heat loads

  7. The experts from the Review of LHC Superconducting Cables and Magnet Production, accompanied by the committee's secretary and the Head of the Magnets and Superconductors Group.

    CERN Document Server

    2004-01-01

    From left to right: Ron Scanlan (Lawrence Berkeley National Laboratory, US), Taka Shintomi (KEK Laboratory, Japan), Claudine Bosteels (Secretary of the Review, AT-MAS Group, CERN), Lucio Rossi (Head of AT-MAS Group, CERN), Ettore Salpietro (EDFA-Iter project), Bruce Strauss (US Department of Energy, Chairman of the committee), and Pierre Vedrine (CEA-DAPNIA-SACM, France).

  8. Report on the third meeting of the project advisory committee (technical) for IAEA/WHO Project EGY/6/004 (Egyptian Cancer Project) 27-29 April 1985, at NEMROCK, Cairo. PACT(3)

    International Nuclear Information System (INIS)

    Taylor, C.B.G.

    1985-06-01

    The Project was launched in March 1983, with the first meeting of the Committee (PACT(I)). It was planned for a duration of four years. Now, after two years experience, PACT(III) met to review results so far and to advise on actions for the remaining two years. Appendix 1 lists those present at the meeting. Since 1983 a Pilot Project has been running at NEMROCK, the Nuclear Medicine and Radiation Oncology Centre at Cairo University Hospital, at which the Project is based. Two training courses have been given, in November 1983 and November 1984, and treatment has been given using protocols developed under the project. PACT(III) examined clinical results obtained so far and made recommendations for the extension of the scheme to other hospitals in Egypt

  9. Ethical review from the inside: repertoires of evaluation in Research Ethics Committee meetings

    NARCIS (Netherlands)

    de Jong, Jean Philippe; van Zwieten, Myra C. B.; Willems, Dick L.

    2012-01-01

    Evaluating the practice of ethical review by Research Ethics Committees (REC) could help protect the interests of human participants and promote scientific progress. To facilitate such evaluations, we conducted an ethnographic study of how an REC reviews research proposals during its meetings. We

  10. 2017 Project Peer Review Report

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2018-02-06

    This document summarizes the recommendations and evaluations provided by an independent external panel of experts at the 2017 U.S. Department of Energy Bioenergy Technologies Office's Peer Review meeting.

  11. Report of the review committee on evaluation of the R and D subjects in the field of nuclear safety research

    International Nuclear Information System (INIS)

    2000-09-01

    On the basis of the JAERI's Basic Guidelines for the Research Evaluation Methods and the Practices Manuals of the Institution Evaluation Committee and Research Evaluation Committee, the Ad Hoc Review Committee on Nuclear Safety Research composed of twelve experts was set up under the Research Evaluation Committee of the JAERI in order to review the R and D subjects to be implemented for five years starting in FY2000 in the Nuclear Safety Research Center (Department of Reactor Safety Research, Department of Fuel Cycle Safety Research and Department of Safety Research Technical Support). The Ad Hoc Review Committee meeting was held on January 20, 2000. According to the review methods including review items, points of review and review criteria, determined by the Research Evaluation Committee, the review was conducted based on the research plan documents submitted in advance and presentations by the Department Directors. The review report was submitted to the Research Evaluation Committee for further review and discussions in its meeting held on August 31, 2000. The Research Evaluation Committee recognized the review results as appropriate. This report describes the review results. (author)

  12. Report of the DOE Office of Energy Research review committee on the Solenoidal Detector Collaboration of the Superconducting Super Collider

    International Nuclear Information System (INIS)

    1992-11-01

    At the request of Dr. James F. Decker, Deputy Director of DOE's Office of Energy Research, a technical review committee was assembled to perform a peer review of the Solenoidal Detector Collaboration (SDC) from October 26 to October 30, 1992, at the Superconducting Super Collider Laboratory (SSCL). The Energy Research Review Committee (ERC) evaluated the technical feasibility, the estimated cost, the proposed construction schedule, and the management arrangements for the SDC detector as documented in the SDC Technical Design Report, SDC Project Cost/Schedule Summary Book, SDC draft Project Management Plan, and other materials prepared for and presented to the Committee by the SDC management. The SDC detector is one of two major detector facilities anticipated at the SSC. The SDC project will be carried out by a worldwide collaboration of almost 1000 scientists, engineers, and managers from over 100 universities, national laboratories, and industries. The SDC will construct a state-of-the-art, general-purpose detector weighing over 26,000 tons and the size of an eight-story building, to perform a broad class of high energy physics experiments at the SSC beginning in the fall of 1999. The design of the SSC detector emphasizes tracking in a strong solenoidal magnetic field to measure charged-particle momenta and to assist in providing good electron and muon identification; identification of neutrinos and other penetrating particles using a hermetic calorimeter; studies of jets of hadrons using both calorimeter and tracking systems; and studies of short-lived particles, such as B mesons, and pattern recognition within complex events using a silicon-based vertex tracking system. These capabilities are the result of the intensive research, development, and design activities undertaken since 1989 by this very large and capable collaboration

  13. Report of the review committee on evaluation of the R and D subjects in the field of nuclear fusion research

    International Nuclear Information System (INIS)

    2000-10-01

    On the basis of the JAERI's Basic Guidelines for the Research Evaluation Methods and the Practices Manuals of the Institution Evaluation Committee, the Ad Hoc Review Committee composed of 12 experts was set up under the Research Evaluation Committee of the JAERI in order to review the whole R and D subjects in fusion research, including post-review for those completed in FY1998, intermediate-review for those started in FY1999, and pre-review for those to be implemented in FY2001. The Ad Hoc Review Committee meeting was held on March 9, 2000. According to the review methods including review items, points of review and review criteria, determined by the Research Evaluation Committee, the review was conducted based on the research result/plan documents submitted in advance and presentations by the Department Directors. The review report was submitted to the Research Evaluation Committee for further review and discussions in its meeting held on August 31, 2000. The Research Evaluation Committee recognized the review results as appropriate. This report describes the review results. (author)

  14. Report of the Committee to review safeguards requirements at power reactors

    International Nuclear Information System (INIS)

    1983-05-01

    In October 1982, NRC's Executive Director for Operations appointed a five-member Committee to review NRC security requirements at nuclear power plants with a view toward evaluating the impact of these requirements on operational safety. During visits to five power reactor sites and more than a dozen days of meetings over a period of four months, the Committee observed plant operating conditions and obtained views from abut 100 persons representing 16 nuclear utilities and industry organizations. They also interviewed about 40 NRC employees, including Resident Inspectors, and members of the Regional and Headquarters staffs. Overall, the Committee did not identify any clear operational safety problems associated with implementation of the NRC's security requirements. However, they did find that the potential existed, to varying degrees, at licensed facilities. The Committee's report, dated February 28, 1983, contains five basic findings and a number of associated recommendations intended to minimize the potential impact of security on safety

  15. Implementing an interprofessional patient safety learning initiative: insights from participants, project leads and steering committee members.

    Science.gov (United States)

    Jeffs, Lianne; Abramovich, Ilona Alex; Hayes, Chris; Smith, Orla; Tregunno, Deborah; Chan, Wai-Hin; Reeves, Scott

    2013-11-01

    Effective teamwork and interprofessional collaboration are vital for healthcare quality and safety; however, challenges persist in creating interprofessional teamwork and resilient professional teams. A study was undertaken to delineate perceptions of individuals involved with the implementation of an interprofessional patient safety competency-based intervention and intervention participants. The study employed a qualitative study design that triangulated data from interviews with six steering committee members and five members of the project team who developed and monitored the intervention and six focus groups with clinical team members who participated in the intervention and implemented local patient safety projects within a large teaching hospital in Canada. Our study findings reveal that healthcare professionals and support staff acquired patient safety competencies in an interprofessional context that can result in improved patient and work flow processes. However, key challenges exist including managing projects amidst competing priorities, lacking physician engagement and sustaining projects. Our findings point to leaders to provide opportunities for healthcare teams to engage in interprofessional teamwork and patient safety projects to improve quality of patient care. Further research efforts should examine the sustainability of interprofessional safety projects and how leaders can more fully engage the participation of all professions, specifically physicians.

  16. Report of the review committee on evaluation of the research subjects in the field of advanced science research (FY2000)

    International Nuclear Information System (INIS)

    2000-10-01

    On the basis of the JAERI's Basic Guidelines for the Research Evaluation Methods and the Practices Manuals of the Institution Evaluation Committee, the Ad Hoc Review Committee composed of eight experts was set up under the Research Evaluation Committee of the JAERI in order to review the research themes completed in FY1999, those to be ended through FY2000, and those planned for five years starting in FY2001 in the Advanced Science Research Center. The Ad Hoc Review Committee meeting was held on July 17, 2000. According to the review methods including review items, points of review and review criteria, determined by the Research Evaluation Committee, the review was conducted based on the research result/plan documents submitted in advance and presentations by the Research Group Leaders. The review report was submitted to the Research Evaluation Committee for further review and discussions in its meeting held on August 31, 2000. The Research Evaluation Committee recognized the review results as appropriate. This report describes the review results. (author)

  17. Historical methane hydrate project review

    Science.gov (United States)

    Collett, Timothy; Bahk, Jang-Jun; Frye, Matt; Goldberg, Dave; Husebo, Jarle; Koh, Carolyn; Malone, Mitch; Shipp, Craig; Torres, Marta

    2013-01-01

    effort, the U.S. Congress enacted Public Law 106-­‐193, the Methane Hydrate Research and Development Act of 2000. This Act called for the Secretary of Energy to begin a methane hydrate research and development program in consultation with other U.S. federal agencies. At the same time a new methane hydrate research program had been launched in Japan by the Ministry of International Trade and Industry to develop plans for a methane hydrate exploratory drilling project in the Nankai Trough. Since this early start we have seen other countries including India, China, Canada, and the Republic of Korea establish large gas hydrate research and development programs. These national led efforts have also included the investment in a long list of important scientific research drilling expeditions and production test studies that have provided a wealth of information on the occurrence of methane hydrate in nature. The most notable expeditions and projects have including the following:-­‐Ocean Drilling Program Leg 164 (1995)-­‐Japan Nankai Trough Project (1999-­‐2000)-­‐Ocean Drilling Program Leg 204 (2004)-­‐Japan Tokai-­‐oki to Kumano-­‐nada Project (2004)-­‐Gulf of Mexico JIP Leg I (2005)-­‐Integrated Ocean Drilling Program Expedition 311 (2005)-­‐Malaysia Gumusut-­‐Kakap Project (2006)-­‐India NGHP Expedition 01 (2006)-­‐China GMGS Expedition 01 (2007)-­‐Republic of Korea UBGH Expedition 01 (2007)-­‐Gulf of Mexico JIP Leg II (2009)-­‐Republic of Korea UBGH Expedition 02 (2010)-­‐MH-­‐21 Nankai Trough Pre-­‐Production Expedition (2012-­‐2013)-­‐Mallik Gas Hydrate Testing Projects (1998/2002/2007-­‐2008)-­‐Alaska Mount Elbert Stratigraphic Test Well (2007)-­‐Alaska Iġnik Sikumi Methane Hydrate Production Test Well (2011-­‐2012)Research coring and seismic programs carried out by the Ocean Drilling Program (ODP) and Integrated Ocean Drilling Program (IODP), starting with the ODP Leg 164 drilling of the

  18. Report of the evaluation by the Ad Hoc Review Committee on Nuclear Safety Research. Result evaluation in fiscal year 2000

    International Nuclear Information System (INIS)

    2001-06-01

    The Research Evaluation Committee, which consisted of 14 members from outside of the Japan Atomic Energy Research Institute (JAERI), set up an Ad Hoc Review Committee on Nuclear Safety Research in accordance with the Fundamental Guideline for the Evaluation of Research and Development (R and D) at JAERI' and its subsidiary regulations in order to evaluate the R and D accomplishments achieved for five years from Fiscal Year 1995 to Fiscal Year 1999 at Department of Reactor Safety Research, Department of Fuel Cycle Safety Research, Department of Environmental Safety Research and Department of Safety Research Technical Support in Tokai Research Establishment at JAERI. The Ad Hoc Review Committee consisted of 11 specialists from outside of JAERI. The Ad Hoc Review Committee conducted its activities from December 2000 to February 2001. The evaluation was performed on the basis of the materials submitted in advance and of the oral presentations made at the Ad Hoc Review Committee meeting which was held on December 11, 2000, in line with the items, viewpoints, and criteria for the evaluation specified by the Research Evaluation Committee. The result of the evaluation by the Ad Hoc Review Committee was submitted to the Research Evaluation Committee, and was judged to be appropriate at its meeting held on March 16, 2001. This report describes the result of the evaluation by the Ad Hoc Review Committee on Nuclear Safety Research. (author)

  19. Report of the evaluation by the Ad Hoc Review Committee on Health Physics. Result evaluation in fiscal year 2000

    International Nuclear Information System (INIS)

    2001-06-01

    The Research Evaluation Committee, which consisted of 14 members from outside of the Japan Atomic Energy Research Institute (JAERI), set up an Ad Hoc Review Committee on Health Physics in accordance with the 'Fundamental Guideline for the Evaluation of Research and Development (R and D) at JAERI' and its subsidiary regulations in order to evaluate the R and D accomplishments achieved for five years from Fiscal Year 1995 to Fiscal Year 1999 at Department of Health Physics in Tokai Research Establishment and at related departments in other Establishments of JAERI. The Ad Hoc Review Committee consisted of six specialists from outside of JAERI. The Ad Hoc Review Committee conducted its activities from October 2000 to January 2001. The evaluation was performed on the basis of the materials submitted in advance and of the oral presentations made at the Ad Hoc Review Committee meeting which was held on October 10, 2000, in line with the items, viewpoints, and criteria for the evaluation specified by the Research Evaluation Committee. The result of the evaluation by the Ad Hoc Review Committee was submitted to the Research Evaluation Committee, and was judged to be appropriate at its meeting held on March 16, 2001. This report describes the result of the evaluation by the Ad Hoc Review Committee on Health Physics. (author)

  20. Report of the evaluation by the Ad Hoc Review Committee on Nuclear Safety Research. Result evaluation in fiscal year 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-06-01

    The Research Evaluation Committee, which consisted of 14 members from outside of the Japan Atomic Energy Research Institute (JAERI), set up an Ad Hoc Review Committee on Nuclear Safety Research in accordance with the Fundamental Guideline for the Evaluation of Research and Development (R and D) at JAERI' and its subsidiary regulations in order to evaluate the R and D accomplishments achieved for five years from Fiscal Year 1995 to Fiscal Year 1999 at Department of Reactor Safety Research, Department of Fuel Cycle Safety Research, Department of Environmental Safety Research and Department of Safety Research Technical Support in Tokai Research Establishment at JAERI. The Ad Hoc Review Committee consisted of 11 specialists from outside of JAERI. The Ad Hoc Review Committee conducted its activities from December 2000 to February 2001. The evaluation was performed on the basis of the materials submitted in advance and of the oral presentations made at the Ad Hoc Review Committee meeting which was held on December 11, 2000, in line with the items, viewpoints, and criteria for the evaluation specified by the Research Evaluation Committee. The result of the evaluation by the Ad Hoc Review Committee was submitted to the Research Evaluation Committee, and was judged to be appropriate at its meeting held on March 16, 2001. This report describes the result of the evaluation by the Ad Hoc Review Committee on Nuclear Safety Research. (author)

  1. Specialist committee's review reports for experimental fast reactor JOYO' MK-III performance tests

    International Nuclear Information System (INIS)

    Yamashita, Kiyonobu; Okubo, Toshiyuki; Kamide, Hideki

    2004-02-01

    Performance tests (startup-physics tests and power elevation tests) were planed for experimental fast reactor 'JOYO' MK-III where irradiation performances were upgraded by power increase from 100 to 140 MW. The reactor safety committee of O-arai Engineering Center has established a specialist committee for 'JOYO' MK-III Performance Tests at the first meeting of 2003 on 23th. April 2003, to accomplish the tests successfully. Subjects of the specialist committee were reviews of following items covering a wide range. 1) Contents of modification works. 2) Reflections of functional test results to the plant and facilities. 3) Reflections of safety rule modification to instruction and manual for operation. 4) Quality assurances and pre-calculation for performance test. 5) Inspection plan and its results. 6) Adequacy of performance test plan. 7) Confirmation of performance test results. Before test-starts, the specialist committee has confirmed by reviewing the items from 1) to 6) based on explanations and documents of the Division of Experimental Reactor, that the test plan and pre-inspections are adequate. After the tests, the specialist committee had confirmed by reviewing the item 7) in the same way, that the each test result satisfies the corresponding criterion. The specialist committee has concluded from these review's results before and after the tests that the 'JOYO' MK-III Performance Tests were carried out appropriately. Besides, the first criticality of the JOYO MK-III was achieved on 2nd. July 2003, and the continuous full power operation was carried on 20th. Nov. 2003. Finally, all performance tests were completed by the pass of the last governmental pre-serviced inspection (dose rate measurement during the shut down condition). (author)

  2. 77 FR 74875 - Native American Graves Protection and Repatriation Review Committee Findings Related to the...

    Science.gov (United States)

    2012-12-18

    ... to convene the parties to a dispute relating to the identity and return of cultural items, and to... American Graves Protection and Repatriation Review Committee Findings Related to the Identity and Return of Cultural Items in the Possession of the University of Pennsylvania Museum of Archaeology and Anthropology...

  3. 42 CFR 50.405 - What is the structure of review committees?

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false What is the structure of review committees? 50.405 Section 50.405 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS POLICIES OF GENERAL APPLICABILITY Public Health Service Grant Appeals Procedure § 50.405 What is the...

  4. Extra-Judicial Complaints Review: First Experiences of the Dutch Public Procurement Experts Committee

    NARCIS (Netherlands)

    Jansen, C.E.C.; Janssen, J.G.J.; Muntz-Beekhuis, J.S.

    2014-01-01

    Article 4.27 of the Dutch Public Procurement Act 2012 (‘Aanbestedingswet’) provides for a statutory basis for extra-judicial public procurement complaints review by an independent body: The Public Procurement Experts Committee (‘Commissie van Aanbestedingsexperts’), hereinafter referred to as: ‘the

  5. A review of software project testing

    Directory of Open Access Journals (Sweden)

    Jose Calvo-Manzano Villalón

    2016-03-01

    Full Text Available In this article a review of software projects based on a taxonomy project is established, allowing the development team or testing personnel to identify the tests to which the project must be subjected for validation. The taxonomy is focused on identifying software projects according to their technology. To establish the taxonomy, a development method comprised of 5 phases was applied. The developed taxonomy is comprised of 10 categories and 35 subcategories and was validated by a group of information technology (IT managers and professionals in the field of IT through the use of a survey. The results obtained from the survey are subjected to the Mann-Whitney U test, which indicates that the taxonomy is validated. The taxonomy can be implemented in development organizations with or without a testing team that provides a classification for technology projects.

  6. Review of the Fusion Theory and Computing Program. Fusion Energy Sciences Advisory Committee (FESAC)

    International Nuclear Information System (INIS)

    Antonsen, Thomas M.; Berry, Lee A.; Brown, Michael R.; Dahlburg, Jill P.; Davidson, Ronald C.; Greenwald, Martin; Hegna, Chris C.; McCurdy, William; Newman, David E.; Pellegrini, Claudio; Phillips, Cynthia K.; Post, Douglass E.; Rosenbluth, Marshall N.; Sheffield, John; Simonen, Thomas C.; Van Dam, James

    2001-01-01

    At the November 14-15, 2000, meeting of the Fusion Energy Sciences Advisory Committee, a Panel was set up to address questions about the Theory and Computing program, posed in a charge from the Office of Fusion Energy Sciences (see Appendix A). This area was of theory and computing/simulations had been considered in the FESAC Knoxville meeting of 1999 and in the deliberations of the Integrated Program Planning Activity (IPPA) in 2000. A National Research Council committee provided a detailed review of the scientific quality of the fusion energy sciences program, including theory and computing, in 2000.

  7. Boards of directors, audit committees and financial reporting quality. A systematic review

    Directory of Open Access Journals (Sweden)

    Karolina Skorulska

    2016-12-01

    Full Text Available Measurement of financial reporting quality is a problematic task because financial reporting is difficult to observe and measure. The aim of the article is to present the methods of financial reporting quality meas-urement and a systematic review of literature on the effects of corporate governance reforms on the qualityof financial reporting. The main research questions are: (1 what are the possibilities of measuring financial reporting for research purposes, (2 which of the methods of measuring the quality of financial reporting are used in research on corporate governance, and (3 which variables used in measuring corporate gov-ernance factors affect financial reporting quality? To answer these questions, a critical analysis of literature and a systematic review of research results using meta-analysis was made. For selecting the best articles a three-step collection strategy was used, which resulted in a database of 38 publications. The review has shown that for measuring the quality of financial reporting researchers most frequently use models based on measurement of risk management, and the most common independent variables describing corporate governance are: the size of the audit committee, presence of independent directors on the supervisory board, dual role of CEO, proportion of independent directors in the audit committee, size of the supervisory board, proportion of accounting experts in the audit committee, and frequency of audit committee meetings

  8. PROFESSIONAL CODES OF CONDUCT IN PSYCHOLOGY: DESCRIPTIVE STUDY OF COMPLAINTS REVIEWED BY THE COPC ETHICS COMMITTEE

    Directory of Open Access Journals (Sweden)

    Mila Arch

    2013-09-01

    Full Text Available In recent decades a significant increase has been observed in the number of complaints filed with ethical committees. The possibility of being the subject of a complaint is therefore a growing concern for professionals. However, research on ethics and codes of conduct in psychology is still very limited and real data on the complaints filed with Ethics Committees against psychologists are practically nonexistent. This article describes the results of a descriptive analysis of the complaints reviewed by the COPC Ethics Committee from 1998 to 2011. A total of 324 complaints were filed, but only 20% led to opening disciplinary proceedings, the judicial context being the professional area in which the highest percentage of complaints were filed (85%. Among the most prevalent reasons for complaints were making assessments without prior examination and partiality.

  9. 77 FR 55452 - Lynn Canal-Icy Strait Resource Advisory Committee

    Science.gov (United States)

    2012-09-10

    ... Federal Advisory Committee Act. The purpose of the committee is to improve collaborative relationships and... review and recommend project proposals that will meet the purposes of improving or maintaining existing...

  10. Report of the Review Committee on evaluation of the R and D subjects in the fields of Environmental Science and Health Physics

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    On the basis of the JAERI's Basic Guidelines for the Research Evaluation Methods, etc., the Ad Hoc Review Committee composed of nine experts was set up under the Research Evaluation Committee of the JAERI in order to review the R and D subjects to be implemented for five years starting in FY2000 in the Department of Environmental Science and Department of Health Physics. The Ad Hoc Review Committee meeting was held on August 30, 1999. According to the review methods including review items, points of review and review criteria, determined by the Research Evaluation Committee, the review was conducted based on the research plan documents submitted in advance and presentations by the Department Directors. The review report was submitted to the Research Evaluation Committee for further review and discussions in its meeting held on March 14, 2000. As a result, the Research Evaluation Committee acknowledged appropriateness of the review results. This report describes the review results. (author)

  11. 76 FR 29191 - Lawrence County Resource Advisory Committee

    Science.gov (United States)

    2011-05-20

    ... project proposals and will be soliciting for additional projects. The purpose of the meeting is to review submitted projects and vote on project proposals to recommend for funding. DATES: The meeting will be held... be conducted: Review proposed projects. If Committee members have enough information, they may choose...

  12. 75 FR 62630 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee

    Science.gov (United States)

    2010-10-12

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and...

  13. 75 FR 39330 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee

    Science.gov (United States)

    2010-07-08

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and...

  14. 75 FR 55404 - Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee

    Science.gov (United States)

    2010-09-10

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Tax Forms and Publications/MLI Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Tax Forms and...

  15. 77 FR 30591 - Open Meeting of the Taxpayer Advocacy Panel Face-to-Face Service Methods Project Committee

    Science.gov (United States)

    2012-05-23

    ... Face-to-Face Service Methods Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice of meeting. SUMMARY: An open meeting of the Taxpayer Advocacy Panel Face-to-Face [[Page 30592... meeting will be held Thursday, June 7 from 8:00 a.m.-5:00 p.m. Eastern Time and Friday, June 8 from 8:00 a...

  16. Maximum entropy PDF projection: A review

    Science.gov (United States)

    Baggenstoss, Paul M.

    2017-06-01

    We review maximum entropy (MaxEnt) PDF projection, a method with wide potential applications in statistical inference. The method constructs a sampling distribution for a high-dimensional vector x based on knowing the sampling distribution p(z) of a lower-dimensional feature z = T (x). Under mild conditions, the distribution p(x) having highest possible entropy among all distributions consistent with p(z) may be readily found. Furthermore, the MaxEnt p(x) may be sampled, making the approach useful in Monte Carlo methods. We review the theorem and present a case study in model order selection and classification for handwritten character recognition.

  17. Whether Audit Committee Financial Expertise Is the Only Relevant Expertise: A Review of Audit Committee Expertise and Timeliness of Financial Reporting

    Directory of Open Access Journals (Sweden)

    Saeed Rabea Baatwah

    2013-06-01

    Full Text Available This study reviews the literature on audit committee expertise and financial reporting timeliness. Financial reporting timeliness and audit committee expertise are two areas of research gaining the attention of a large number of stakeholders because they contribute to the reliability and the  relevancy of financial reporting. Indeed, the focus of this review is primarily on the recent developments in the pertinent literature in order to show the limitations of such research and encourage future research to overcome these limitations. By also looking at the development of the audit committee expertise literature, this study concludes that (1 like most audit committee literature, financial reporting timeliness literature continues to assume the absence of the contribution of expertise other than financial expertise, and ignore the role of audit committee chair; (2 most of this literature fails to find a significant effect because it ignores the interaction among corporate governance mechanisms. Accordingly, this study posits that ignoring the issues raised in such research by future research would lead to major mistakes in reforms relating to how the quality of financial reporting can be enhanced.

  18. Krsko periodic safety review project prioritization process

    International Nuclear Information System (INIS)

    Basic, I.; Vrbanic, I.; Spiler, J.; Lambright, J.

    2004-01-01

    Definition of a Krsko Periodic Safety Review (PSR) project is a comprehensive safety review of a plant after last ten years of operation. The objective is a verification by means of a comprehensive review using current methods that Krsko NPP remains safety when judged against current safety objectives and practices and that adequate arrangements are in place to maintain plant safety. This objective encompasses the three main criteria or goals: confirmation that the plant is as safe as originally intended, determination if there are any structures, systems or components that could limit the life of the plant in the foreseeable future, and comparison the plant against modern safety standards and to identify where improvements would be beneficial at justifiable cost. Krsko PSR project is structured in the three phases: Phase 1: Preparation of Detailed 10-years PSR Program, Phase 2: Performing of 10-years PSR Program and preparing of associated documents (2001-2003), and Phase 3: Implementation of the prioritized compensatory measures and modifications (development of associated EEAR, DMP, etc.) after agreement with the SNSA on the design, procedures and time-scales (2004-2008). This paper presents the NEK PSR results of work performed under Phase 2 focused on the ranking of safety issues and prioritization of corrective measures needed for establishing an efficient action plan. Safety issues were identified in Phase 2 during the following review processes: Periodic Safety Review (PSR) task; Krsko NPP Regulatory Compliance Program (RCP) review; Westinghouse Owner Group (WOG) catalog items screening/review; SNSA recommendations (including IAEA RAMP mission suggestions/recommendations).(author)

  19. Special committee review of the Nuclear Regulatory Commission's severe accident risks report (NUREG--1150)

    International Nuclear Information System (INIS)

    Kouts, H.J.C.; Apostolakis, G.; Kastenberg, W.E.; Birkhofer, E.H.A.; Hoegberg, L.G.; LeSage, L.G.; Rasmussen, N.C.; Teague, H.J.; Taylor, J.J.

    1990-08-01

    In April 1989, the Nuclear Regulatory Commission's (NRC) Office of Nuclear Regulatory Research (RES) published a draft report ''Severe Accident Risks: An Assessment for Five US Nuclear Power Plants,'' NUREG-1150. This report updated, extended and improved upon the information presented in the 1974 ''Reactor Safety Study,'' WASH-1400. Because the information in NUREG-1150 will play a significant role in implementing the NRC's Severe Accident Policy, its quality and credibility are of critical importance. Accordingly, the Commission requested that the RES conduct a peer review of NUREG-1150 to ensure that the methods, safety insights and conclusions presented are appropriate and adequately reflect the current state of knowledge with respect to reactor safety. To this end, RES formed a special committee in June of 1989 under the provisions of the Federal Advisory Committee Act. The Committee, composed of a group of recognized national and international experts in nuclear reactor safety, was charged with preparing a report reflecting their review of NUREG-1150 with respect to the adequacy of the methods, data, analysis and conclusions it set forth. The report which precedes reflects the results of this peer review

  20. Proceedings of RIKEN BNL Research Center Workshop, Volume 91, RBRC Scientific Review Committee Meeting

    Energy Technology Data Exchange (ETDEWEB)

    Samios,N.P.

    2008-11-17

    The ninth evaluation of the RIKEN BNL Research Center (RBRC) took place on Nov. 17-18, 2008, at Brookhaven National Laboratory. The members of the Scientific Review Committee (SRC) were Dr. Dr. Wit Busza (Chair), Dr. Miklos Gyulassy, Dr. Akira Masaike, Dr. Richard Milner, Dr. Alfred Mueller, and Dr. Akira Ukawa. We are pleased that Dr. Yasushige Yano, the Director of the Nishina Institute of RIKEN, Japan participated in this meeting both in informing the committee of the activities of the Nishina Institute and the role of RBRC and as an observer of this review. In order to illustrate the breadth and scope of the RBRC program, each member of the Center made a presentation on his/her research efforts. This encompassed three major areas of investigation, theoretical, experimental and computational physics. In addition the committee met privately with the fellows and postdocs to ascertain their opinions and concerns. Although the main purpose of this review is a report to RIKEN Management (Dr. Ryoji Noyori, RIKEN President) on the health, scientific value, management and future prospects of the Center, the RBRC management felt that a compendium of the scientific presentations are of sufficient quality and interest that they warrant a wider distribution. Therefore we have made this compilation and present it to the community for its information and enlightenment.

  1. DOE Advanced Scientific Computing Advisory Committee (ASCAC) Report: Exascale Computing Initiative Review

    Energy Technology Data Exchange (ETDEWEB)

    Reed, Daniel [University of Iowa; Berzins, Martin [University of Utah; Pennington, Robert; Sarkar, Vivek [Rice University; Taylor, Valerie [Texas A& M University

    2015-08-01

    On November 19, 2014, the Advanced Scientific Computing Advisory Committee (ASCAC) was charged with reviewing the Department of Energy’s conceptual design for the Exascale Computing Initiative (ECI). In particular, this included assessing whether there are significant gaps in the ECI plan or areas that need to be given priority or extra management attention. Given the breadth and depth of previous reviews of the technical challenges inherent in exascale system design and deployment, the subcommittee focused its assessment on organizational and management issues, considering technical issues only as they informed organizational or management priorities and structures. This report presents the observations and recommendations of the subcommittee.

  2. The 2008 annual report of the Regional Infant and Child Mortality Review Committee.

    Science.gov (United States)

    Randall, Brad; Wilson, Ann

    2009-12-01

    The 2008 annual report of the Regional Infant and Child Mortality Review Committee (RICMRC) is presented. This committee has as its mission the review of infant and child deaths so that information can be transformed into action to protect young lives. The 2008 review area includes South Dakota's Minnehaha, Turner, Lincoln, Moody, Lake, McCook, Union, Hansen, Miner and Brookings counties. Within our region in 2008, there were six infant deaths labeled as Sudden Unexpected Infant Deaths (SUID), of which two met the criteria for the Sudden Infant Death Syndrome (SIDS). The four non-SIDS SUID deaths all represented deaths where asphyxia from unsafe sleeping environments could not be excluded. In addition, there were two accidental deaths from asphyxia in unsafe sleeping enviroments. We need to continue to promote the "Back to Sleep" campaign message of not only placing infants to sleep on their backs, but also making sure infants are put down to sleep on safe, firm, sleeping surfaces and are appropriately dressed for the ambient temperature. Parents need to be aware of the potential hazards of bed-sharing with their infants. In both 2007 and 2008, four children died in motor vehicle crashes, none of which were alcohol-related. Three fire-related childhood deaths were associated with one house fire involving a nonfunctional smoke alarm and a sleeping arrangement without an easy egress from a fire. Since 1997, the RICMRC has sought to achieve its mission to "review infant and child deaths so that information can be transformed into action to protect young lives". For 2008, the committee reviewed 21 deaths from Minnehaha, Turner, Lincoln, Moody, Lake, McCook, Union, Hansen, Miner and Brookings counties that met the following criteria: Children under the age of 18 dying subsequent to hospital discharge following delivery. Children who either died in these counties from causes sustained in them, or residents who died elsewhere from causes sustained in the ten-county region.

  3. 75 FR 36301 - Review and Approval of Projects

    Science.gov (United States)

    2010-06-25

    ... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Parts 806 and 808 Review and Approval of Projects AGENCY... document contains proposed rules that would amend the project review regulations of the Susquehanna River... the scope of withdrawals requiring review and approval; improve notice procedures for all project...

  4. Final Report to the Department of the Energy for Project Entitled Rare Isotope Science Assessment Committee

    International Nuclear Information System (INIS)

    Shapero, Donald; Meyer, Timothy I.

    2007-01-01

    The Rare Isotope Science Assessment Committee (RISAC) was convened by the National Research Council in response to an informal request from the DOE's Office of Nuclear Physics and the White House Office of Management and Budget. The charge to the committee is to examine and assess the broader scientific and international contexts of a U.S.-based rare-isotope facility. The committee met for the first time on December 16-17, 2005, in Washington, DC, and held three subsequent meetings. The committee's's final report was publicly released in unedited, prepublication form on Friday, December 8, 2006. The report was published in full-color by the National Academies Press in April 2007. Copies of the report were distributed to key decision makers and stakeholders around the world.

  5. PROCEEDINGS OF RIKEN BNL RESEARCH CENTER WORKSHOP, VOLUME 77, RBRC SCIENTIFIC REVIEW COMMITTEE MEETING, OCTOBER 10-12, 2005

    Energy Technology Data Exchange (ETDEWEB)

    SAMIOS, N.P.

    2005-10-10

    The eighth evaluation of the RIKEN BNL Research Center (RBRC) took place on October 10-12, 2005, at Brookhaven National Laboratory. The members of the Scientific Review Committee (SRC) were Dr. Jean-Paul Blaizot, Professor Makoto Kobayashi, Dr. Akira Masaike, Professor Charles Young Prescott (Chair), Professor Stephen Sharpe (absent), and Professor Jack Sandweiss. We are grateful to Professor Akira Ukawa who was appointed to the SRC to cover Professor Sharpe's area of expertise. In addition to reviewing this year's program, the committee, augmented by Professor Kozi Nakai, evaluated the RBRC proposal for a five-year extension of the RIKEN BNL Collaboration MOU beyond 2007. Dr. Koji Kaya, Director of the Discovery Research Institute, RIKEN, Japan, presided over the session on the extension proposal. In order to illustrate the breadth and scope of the RBRC program, each member of the Center made a presentation on higher research efforts. In addition, a special session was held in connection with the RBRC QCDSP and QCDOC supercomputers. Professor Norman H. Christ, a collaborator from Columbia University, gave a presentation on the progress and status of the project, and Professor Frithjof Karsch of BNL presented the first physics results from QCDOC. Although the main purpose of this review is a report to RIKEN Management (Dr. Ryoji Noyori, RIKEN President) on the health, scientific value, management and future prospects of the Center, the RBRC management felt that a compendium of the scientific presentations are of sufficient quality and interest that they warrant a wider distribution. Therefore we have made this compilation and present it to the community for its information and enlightenment.

  6. PROCEEDINGS OF RIKEN BNL RESEARCH CENTER WORKSHOP, VOLUME 77, RBRC SCIENTIFIC REVIEW COMMITTEE MEETING, OCTOBER 10-12, 2005

    International Nuclear Information System (INIS)

    SAMIOS, N.P.

    2005-01-01

    The eighth evaluation of the RIKEN BNL Research Center (RBRC) took place on October 10-12, 2005, at Brookhaven National Laboratory. The members of the Scientific Review Committee (SRC) were Dr. Jean-Paul Blaizot, Professor Makoto Kobayashi, Dr. Akira Masaike, Professor Charles Young Prescott (Chair), Professor Stephen Sharpe (absent), and Professor Jack Sandweiss. We are grateful to Professor Akira Ukawa who was appointed to the SRC to cover Professor Sharpe's area of expertise. In addition to reviewing this year's program, the committee, augmented by Professor Kozi Nakai, evaluated the RBRC proposal for a five-year extension of the RIKEN BNL Collaboration MOU beyond 2007. Dr. Koji Kaya, Director of the Discovery Research Institute, RIKEN, Japan, presided over the session on the extension proposal. In order to illustrate the breadth and scope of the RBRC program, each member of the Center made a presentation on higher research efforts. In addition, a special session was held in connection with the RBRC QCDSP and QCDOC supercomputers. Professor Norman H. Christ, a collaborator from Columbia University, gave a presentation on the progress and status of the project, and Professor Frithjof Karsch of BNL presented the first physics results from QCDOC. Although the main purpose of this review is a report to RIKEN Management (Dr. Ryoji Noyori, RIKEN President) on the health, scientific value, management and future prospects of the Center, the RBRC management felt that a compendium of the scientific presentations are of sufficient quality and interest that they warrant a wider distribution. Therefore we have made this compilation and present it to the community for its information and enlightenment

  7. The Service Review Committee: Royal College of Radiologists. Philosophy, role, and lessons to be learned

    International Nuclear Information System (INIS)

    Thind, R.; Barter, S.

    2008-01-01

    The Service Review Committee (SRC) was established by the Board of the Faculty of Clinical Radiology in 2000. At the time, the RCR identified a clear need to respond appropriately and swiftly to requests for review of service provision in clinical radiology departments where trusts were concerned about standards or performance issues. It was recognized by the College that the poorly performing radiologist is often part of a department that is itself dysfunctional, and that sub-optimal performance may often reflect inadequate management, lack of support, overwhelming workload, or inadequate facilities. Following the completion of a range of service reviews during its first 6 years, the SRC recognized that among the reviews there were recurring themes and causes for poorly functioning departments. The committee felt it appropriate to share these with the wider radiological community. In doing so, it is hoped that other departments may recognize their own problems at an early stage and take appropriate steps to prevent any escalation of difficulties

  8. 76 FR 51938 - Southwest Mississippi Resource Advisory Committee; Meeting

    Science.gov (United States)

    2011-08-19

    ... Resource Advisory Committee will meet in Meadville, MS. The committee is authorized under the Secure Rural... relationships and to provide advice and recommendations to the Forest Service concerning projects and funding... review and select proposed projects. DATES: The meeting will be held September 15, 2011, 6:00 p.m...

  9. Apa-Tappi Whole-Tree Utilization Committee: review of achievements

    Energy Technology Data Exchange (ETDEWEB)

    Plummer, G M

    1978-03-01

    The Apa-Tappi Whole-Tree Utilization Committee started its activities in mid-1974 with people who pioneered the concept of whole-tree chipping. The major problem retarding expansion of use of these chips was determined to be grit and dirt, which is primarily associated with bark and foliage. Utilization of research and tests by member companies and communication with manufacturers resulted in commercial applications that improved chip quality. Other achievements have been the establishment of a nationwide project to develop tree-weight tables, documentation of associated problems, harvesting equipment improvements, screening and separation advances, and needed research work.

  10. Report of the review committee on the Fermilab HGQ R and D program

    International Nuclear Information System (INIS)

    Devred, A.; Anerella, M.; Leroy, D.; Ostojic, R.; Schermer, R.; Vedrine, P.

    1999-04-01

    This document is the report of the committee which met at Fermi National Accelerator Laboratory on 18 and 19 March 1999 to review the Fermilab R and D program on High Gradient Quadrupole magnets for the Large Hadron Collider Insertion Regions. The promising results of model magnet HGQ05 constitute a significant step forward and provide a solid basis upon which to base the magnet program. Although, the quench performance of magnet HGQ05 shows good progress, it is not yet fully satisfactory and can still be improved. The committee recommends that particular attention be paid to the first training quenches at 1.9 K and that more analyses be carried out to find possible correlations between quench start localization and specific mechanical features. In particular, the committee recommends analyzing in detail collar deflection data that seem to indicate that the first training quenches at 1.9 K may have originated in a region of low azimuthal coil pre-compression. The relative success of magnet HGQ05 and a detailed understanding of the reason behind it should help focus the magnet program on a limited number of clearly identified issues. The magnet program should be revised immediately to incorporate the lessons learned from magnet HGQ05 and to address the most outstanding issues. (authors)

  11. The 2007 annual report of the Regional Infant and Child Mortality Review Committee.

    Science.gov (United States)

    Randall, Brad; Wilson, Ann L

    2008-08-01

    The mission of the Regional Infant and Child Mortality Review Committee (RICMRC) is to review infant and child deaths so that information can be transformed into action to protect young lives. The 2007 review area includes South Dakota's Minnehaha, Turner, Lincoln, Moody, Lake, McCook, Union, Hansen, Miner and Brookings counties. Although there were no deaths in 2007 that met the criteria of the Sudden Infant Death Syndrome (SIDS) in our region, there were three infant deaths associated with unsafe sleeping environments (including adult co-sleeping) that either caused or potentially may have caused these infants' deaths. We need to continue to promote the "Back to Sleep" campaign message of not only placing infants to sleep on their backs, but also making sure infants are put down to sleep on safe, firm sleeping surfaces and that they are appropriately dressed for the ambient temperature. Parents need to be aware of the potential hazards of co-sleeping with their infants. Compared to nine such deaths in 2006, only four deaths in 2007 involved motor-vehicle crashes, none of which were alcohol related. Two drowning deaths illustrated the rapidity in which even momentary caregiver distractions can lead to deaths in children in and around water. Since 1997 the Regional Infant and Child Mortality Review Committee (RICMRC) has sought to achieve its mission to "review infant and child deaths so that information can be transformed into action to protect young lives." For 2007, the committee reviewed 25 deaths from Minnehaha, Turner, Lincoln, Moody, Lake, McCook, Union, Hansen, Miner and Brookings counties that met the following criteria: Children under the age of 18 dying subsequent to hospital discharge following delivery. Children who either died in these counties from causes sustained in them, or residents who died elsewhere from causes sustained in the 10-county region. The report that follows reviews the committee's activities for 2007. No deaths meeting the criteria

  12. (No) Limits to Anglo-American Accounting? Reconstructing the History of the International Accounting Standards Committee ; A Review Article

    OpenAIRE

    Botzem, S.; Quack, S.

    2009-01-01

    The development of the current International Accounting Standards Board (IASB) from the earlier International Accounting Standards Committee (IASC) provides insight into many issues of international financial reporting, among them the characteristics of international accounting standards themselves. This article reviews Camfferman and Zeff’s [Camfferman, K., & Zeff, S. A. (2007). Financial reporting and global capital markets. A history of the international accounting standards committee 1973...

  13. 77 FR 75915 - Review and Approval of Projects

    Science.gov (United States)

    2012-12-26

    ... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Part 806 Review and Approval of Projects AGENCY... document contains proposed rules that would amend the project review regulations of the Susquehanna River... set forth in this proposed rulemaking is to make further modifications to the Commission's project...

  14. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    International Nuclear Information System (INIS)

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations

  15. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations.

  16. CERN scientists take part in the Tevatron Run II performance review committee

    CERN Multimedia

    Maximilien Brice

    2002-01-01

    Tevatron Run II is under way at Fermilab, exploring the high-energy frontier with upgraded detectors that will address some of the biggest questions in particle physics.Until CERN's LHC switches on, the Tevatron proton-antiproton collider is the world's only source of top quarks. It is the only place where we can search for supersymmetry, for the Higgs boson, and for signatures of additional dimensions of space-time. The US Department of Energy (DOE) recently convened a high-level international review committee to examine Fermilab experts' first-phase plans for the accelerator complex. Pictured here with a dipole magnet in CERN's LHC magnet test facility are the four CERN scientists who took part in the DOE's Tevatron review. Left to right: Francesco Ruggiero, Massimo Placidi, Flemming Pedersen, and Karlheinz Schindl. Further information: CERN Courier 43 (1)

  17. Atmospheric Ionizing Radiation (AIR) Project Review

    Science.gov (United States)

    Singleterry, R. C., Jr.; Wilson, J. W.; Whitehead, A. H.; Goldhagen, P. E.

    1999-01-01

    The National Council on Radiation Protection and Measurement (NCRP) and the National Academy of Science (NAS) established that the uncertainty in the data and models associated with the high-altitude radiation environment could and should be reduced. In response, the National Aeronautics and Space Administration (NASA) and the U.S. Department of Energy Environmental Measurements Laboratory (EML) created the Atmospheric Ionizing Radiation (AIR) Project under the auspices of the High Speed Research (HSR) Program Office at the Langley Research Center. NASA's HSR Program was developed to address the potential of a second-generation supersonic transport. A critical element focussed on the environmental issues, including the threat to crew and passengers posed by atmospheric radiation. Various international investigators were solicited to contribute instruments to fly on an ER-2 aircraft at altitudes similar to those proposed for the High Speed Civil Transport (HSCT). A list of participating investigators, their institutions, and instruments with quantities measured is presented. The flight series took place at solar minimum (radiation maximum) with northern, southern, and east/west flights. The investigators analyzed their data and presented preliminary results at the AIR Workshop in March, 1998. A review of these results are included.

  18. 76 FR 54730 - Committees on Administration and Management, Collaborative Governance, Judicial Review, and...

    Science.gov (United States)

    2011-09-02

    ... accommodations for persons with disabilities), and how to submit comments to the committee can be found in the ``Research'' section of the ACUS Web site. Go to www.acus.gov and click on Research - > Committee Meetings...

  19. 76 FR 61072 - Committees on Administration and Management, Collaborative Governance, Judicial Review, and...

    Science.gov (United States)

    2011-10-03

    ... accommodations for persons with disabilities), and how to submit comments to the committee can be found in the ``Research'' section of the ACUS Web site. Go to http://www.acus.gov and click on Research -> Committee...

  20. Report of the evaluation by the Ad Hoc Review Committee on advance science research. Result evaluation, interim evaluation, in-advance evaluation in fiscal year 2003

    International Nuclear Information System (INIS)

    2003-11-01

    The Research Evaluation Committee, which consisted of 13 members from outside of the Japan Atomic Energy Research Institute (JAERI), set up an Ad Hoc Review Committee on Advanced Science Research in accordance with the Fundamental Guideline for the Evaluation of Research and Development (R and D) at JAERI' and its subsidiary regulations in order to evaluate the accomplishments of the research completed in Fiscal Year 2002, the accomplishments of the research started in Fiscal Year 2001, and the adequacy of the programs of the research to be started in Fiscal Year 2004 at Advanced Science Research Center of JAERI. The Ad Hoc Review Committee consisted of nine specialists from outside of JAERI. The Ad Hoc Review Committee conducted its activities from May to July 2003. The evaluation was performed on the basis of the materials submitted in advance and of the oral presentations made at the Ad Hoc Review Committee meeting which was held on June 24, 2003, in line with the items, viewpoints, and criteria for the evaluation specified by the Research Evaluation Committee. The result of the evaluation by the Ad Hoc Review Committee was submitted to the Research Evaluation Committee, and was judged to be appropriate at its meeting held on August 4, 2003. This report describes the result of the evaluation by the Ad Hoc Review Committee on Advanced Science Research. (author)

  1. Report of the evaluation by the Ad Hoc Review Committee on Materials Science Research. Ex-post evaluation in fiscal year 2003

    International Nuclear Information System (INIS)

    2004-06-01

    The Research Evaluation Committee, which consisted of 13 members from outside of the Japan Atomic Energy Research Institute (JAERI), set up an Ad Hoc Review Committee on Materials Science Research in accordance with the Fundamental Guideline for the Evaluation of Research and Development (R and D) at JAERI' and its subsidiary regulations in order to evaluate the adequacy of the R and D results achieved for five years until Fiscal Year 2002 at Department of Materials Science in Tokai Research Establishment of JAERI. The Ad Hoc Review Committee consisted of eight specialists from outside of JAERI. The Ad Hoc Review Committee conducted its activities from October 2003 to February 2004. The evaluation was performed on the basis of the materials submitted in advance and of the oral presentations made at the Ad Hoc Review Committee meeting which was held on November 14, 2003, in line with the items, viewpoints, and criteria for the evaluation specified by the Research Evaluation Committee. The result of the evaluation by the Ad Hoc Review Committee was submitted to the Research Evaluation Committee, and was judged to be appropriate at its meeting held on March 8, 2004. This report describes the result of the evaluation by the Ad Hoc Review Committee on Materials Science Research. (author)

  2. Report of the evaluation by the ad hoc review committee on advanced photon and synchrotron radiation research. In-advance evaluation in fiscal year 2001

    International Nuclear Information System (INIS)

    2001-11-01

    The Research Evaluation Committee, which consisted of 13 members from outside of the Japan Atomic Energy Research Institute (JAERI), set up an Ad Hoc Review Committee on Advanced Photon and Synchrotron Radiation Research in accordance with the 'Fundamental Guideline for the Evaluation of Research and Development (R and D) at JAERI' and its subsidiary regulations in order to evaluate the adequacy of the R and D programs to be implemented for five years starting in Fiscal Year 2002 at Advanced Photon Research Center and at Synchrotron Radiation Research Center in Kansai Research Establishment of JAERI. The Ad Hoc Review Committee consisted of ten specialists from outside of JAERI. The Ad Hoc Review Committee conducted its activities from May to July 2001. The evaluation was performed on the basis of the materials submitted in advanced and of the oral presentations made at the Ad Hoc Review Committee meeting which was held on June 21, 2001, in line with the items, viewpoints, and criteria for the evaluation specified by the Research Evaluation Committee. The result of the evaluation by the Ad Hoc Review Committee was submitted to the Research Evaluation Committee, and was judged to be appropriate at its meeting held on July 12, 2001. This report describes the result of the evaluation by the Ad Hoc Review Committee on Advanced Photon and Synchrotron Radiation Research. (author)

  3. Report of the evaluation by the Ad Hoc Review Committee on Information Technology. In-advance evaluation in fiscal year 2000

    International Nuclear Information System (INIS)

    2001-06-01

    The Research Evaluation Committee, which consisted of 14 members from outside of the Japan Atomic Energy Research Institute (JAERI), set up an Ad Hoc Review Committee on Information Technology in accordance with the Fundamental Guideline for the Evaluation of Research and Development (R and D) at JAERI' and its subsidiary regulations in order to evaluate the adequacy of the R and D programs pertaining to the establishment and utilization of the Information Technology Based Laboratory (ITBL) to be implemented for five years starting in Fiscal Year 2001 at Center for Promotion of Computational Science and Engineering and Department of Environmental Sciences of JAERI. The Ad Hoc Review Committee consisted of eight specialists from outside of JAERI. The Ad Hoc Review Committee conducted its activities from February to March 2001. The evaluation was performed on the basis of the materials submitted in advance and of the oral presentations made at the Ad Hoc Review Committee meeting which was held on February 9, 2001, in line with the items, viewpoints, and criteria for the evaluation specified by the Research Evaluation Committee. The result of the evaluation by the Ad Hoc Review Committee was submitted to the Research Evaluation Committee, and was judged to be appropriate at its meeting held on March 16, 2001. This report describes the result of the evaluation by the Ad Hoc Review Committee on Information Technology. (author)

  4. Report of the evaluation by the Ad Hoc Review Committee on Computational Science and Engineering. Result evaluation in fiscal year 2000

    International Nuclear Information System (INIS)

    2001-06-01

    The Research Evaluation Committee, which consisted of 14 members from outside of the Japan Atomic Energy Research Institute (JAERI), set up an Ad Hoc Review Committee on Computational Science and Engineering in accordance with the 'Fundamental Guideline for the Evaluation of Research and Development (R and D) at JAERI' and its subsidiary regulations in order to evaluate the R and D accomplishments achieved for five years from Fiscal Year 1995 to Fiscal Year 1999 at Center for Promotion of Computational Science and Engineering of JAERI. The Ad Hoc Review Committee consisted of seven specialists from outside of JAERI. The Ad Hoc Review Committee conducted its activities from December 2000 to March 2001. The evaluation was performed on the basis of the materials submitted in advance and of the oral presentations made at the Ad Hoc Review Committee meeting which was held on December 27, 2000, in line with the items, viewpoints, and criteria for the evaluation specified by the Research Evaluation Committee. The result of the evaluation by the Ad Hoc Review Committee was submitted to the Research Evaluation Committee, and was judged to be appropriate at its meeting held on March 16, 2001. This report describes the result of the evaluation by the Ad Hoc Review Committee on Computational Science and Engineering. (author)

  5. Report of the evaluation by the ad hoc review committee on radiation application research. In-advance evaluation in fiscal year 2001

    International Nuclear Information System (INIS)

    2001-11-01

    The Research Evaluation Committee, which consisted of 13 members from outside of the Japan Atomic Energy Research Institute (JAERI), set up an Ad Hoc Review Committee on Radiation Application Research in accordance with the Fundamental Guideline for the Evaluation of Research and Development (R and D) at JAERI' and its subsidiary regulations in order to evaluate the adequacy of the R and D programs to be implemented for five years starting in Fiscal Year 2002 at Department of Material Development, at Department of Ion-Beam-Applied Biology and at Advanced Radiation Technology Center in Takasaki Radiation Chemistry Research Establishment of JAERI. The Ad Hoc Review Committee consisted of ten specialists from outside of JAERI. The Ad Hoc Review Committee conducted its activities from May to July 2001. The evaluation was performed on the basis of the materials submitted in advance and of the oral presentations made at the Ad Hoc Review Committee meeting which was held on June 25, 2001, in line with the items, viewpoints, and criteria for the evaluation specified by the Research Evaluation Committee. The result of the evaluation by the Ad Hoc Review Committee was submitted to the Research Evaluation Committee, and was judged to be appropriate at its meeting held on July 12, 2001. This report describes the result of the evaluation by the Ad Hoc Review Committee on Radiation Application Research. (author)

  6. Report of the evaluation by the Ad Hoc Review Committee on Materials Science Research. In-advance evaluation in fiscal year 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-11-01

    The Research Evaluation Committee, which consisted of 13 members from outside of the Japan Atomic Energy Research Institute (JAERI), set up an Ad Hoc Review Committee on Materials Science Research in accordance with the Fundamental Guideline for the Evaluation of Research and Development (R and D) at JAERI' and its subsidiary regulations in order to evaluate the adequacy of the R and D programs to be implemented for five years starting in Fiscal Year 2003 at Department of Materials Science in Tokai Research Establishment of JAERI. The Ad Hoc Review Committee consisted of eight specialists from outside of JAERI. The Ad Hoc Review Committee conducted its activities from April 2002 to August 2002. The evaluation was performed on the basis of the materials submitted in advance and of the oral presentations made at the Ad Hoc Review Committee meeting which was held on June 5th, 2002, in line with the items, viewpoints, and criteria for the evaluation specified by the Research Evaluation Committee. The result of the evaluation by the Ad Hoc Review Committee was submitted to the Research Evaluation Committee, and was judged to be appropriate at its meeting held on August 5th, 2002. This report describes the result of the evaluation by the Ad Hoc Review Committee on Materials Science Research. (author)

  7. Report of the evaluation by the Ad Hoc Review Committee on Advance Science Research. Result evaluation, interim evaluation, in-advance evaluation in fiscal year 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-11-01

    The Research Evaluation Committee, which consisted of 13 members from outside of the Japan Atomic Energy Research Institute (JAERI), set up an Ad Hoc Review Committee on Advanced Science Research in accordance with the Fundamental Guideline for the Evaluation of Research and Development (R and D) at JAERI' and its subsidiary regulations in order to evaluate the accomplishments of the research completed in Fiscal Year 2001, the accomplishments of the research started in Fiscal Year 2000, and the adequacy of the programs of the research to be started in Fiscal Year 2003 at Advanced Science Research Center of JAERI. The Ad Hoc Review Committee consisted of eight specialists from outside of JAERI. The Ad Hoc Review Committee conducted its activities from May to July 2002. The evaluation was performed on the basis of the materials submitted in advance and of the oral presentations made at the Ad Hoc Review Committee meeting which was held on June 4, 2002, in line with the items, viewpoints, and criteria for the evaluation specified by the Research Evaluation Committee. The result of the evaluation by the Ad Hoc Review Committee was submitted to the Research Evaluation Committee, and was judged to be appropriate at its meeting held on August 5, 2002. This report describes the result of the evaluation by the Ad Hoc Review Committee on Advanced Science Research. (author)

  8. Report of the evaluation by the Ad Hoc Review Committee on Materials Science Research. In-advance evaluation in fiscal year 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-11-01

    The Research Evaluation Committee, which consisted of 13 members from outside of the Japan Atomic Energy Research Institute (JAERI), set up an Ad Hoc Review Committee on Materials Science Research in accordance with the Fundamental Guideline for the Evaluation of Research and Development (R and D) at JAERI' and its subsidiary regulations in order to evaluate the adequacy of the R and D programs to be implemented for five years starting in Fiscal Year 2003 at Department of Materials Science in Tokai Research Establishment of JAERI. The Ad Hoc Review Committee consisted of eight specialists from outside of JAERI. The Ad Hoc Review Committee conducted its activities from April 2002 to August 2002. The evaluation was performed on the basis of the materials submitted in advance and of the oral presentations made at the Ad Hoc Review Committee meeting which was held on June 5th, 2002, in line with the items, viewpoints, and criteria for the evaluation specified by the Research Evaluation Committee. The result of the evaluation by the Ad Hoc Review Committee was submitted to the Research Evaluation Committee, and was judged to be appropriate at its meeting held on August 5th, 2002. This report describes the result of the evaluation by the Ad Hoc Review Committee on Materials Science Research. (author)

  9. [Review of WHO Expert Committee on Leprosy 8th report, --comparison to 7th report].

    Science.gov (United States)

    Kitajima, Shinichi; En, Junichiro; Kitajima, Shiori; Barua, Sumana; Goto, Masamichi

    2014-03-01

    In 2012 the WHO Expert Committee on Leprosy published its 8th report, 14 years after the publication of its 7th report in 1998. This report, the first since the leprosy reduction goal was met in 2000, highlights key points such as improvements in the quality of various services available to patients and the efforts of individuals and societies, in addition to medical progress in diagnosis and treatment. This review will mainly describe the changes made since the 7th report. Some of the main modifications are the deletion of single lesion paucibacillary type, elongated treatment of patients with high bacterial indices, the introduction of promising new drugs, and a shift from reducing the statistical number of patients to a new target for disability prevention.

  10. Review of design approaches of advanced pressurized LWRs. Report of a technical committee meeting and workshop

    International Nuclear Information System (INIS)

    1996-01-01

    The Technical Committee Meeting and Workshop was devoted to review and discuss differences and commonalties in the various design approaches with the aim of increasing the understanding of the design decisions taken, and a number of general conclusions were drawn. Though many differences in design approaches were found in the presentations, a number of common features could also be identified. These included design approaches to achieve further improvements with respect to safety, design simplification, reduction in cost, incorporation of feedback from operating experience, and control room improvements regarding human factors and digitization. Design approaches to achieve further improvements in safety included consideration of severe accidents in the design process, increased thermal margins and water inventories, longer grace periods and double containments. Refs, figs and tabs

  11. South African Research Ethics Committee Review of Standards of Prevention in HIV Vaccine Trial Protocols.

    Science.gov (United States)

    Essack, Zaynab; Wassenaar, Douglas R

    2018-04-01

    HIV prevention trials provide a prevention package to participants to help prevent HIV acquisition. As new prevention methods are proven effective, this raises ethical and scientific design complexities regarding the prevention package or standard of prevention. Given its high HIV incidence and prevalence, South Africa has become a hub for HIV prevention research. For this reason, it is critical to study the implementation of relevant ethical-legal frameworks for such research in South Africa. This qualitative study used in-depth interviews to explore the practices and perspectives of eight members of South African research ethics committees (RECs) who have reviewed protocols for HIV vaccine trials. Their practices and perspectives are compared with ethics guideline requirements for standards of prevention.

  12. Review of design approaches of advanced pressurized LWRs. Report of a technical committee meeting and workshop

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    The Technical Committee Meeting and Workshop was devoted to review and discuss differences and commonalties in the various design approaches with the aim of increasing the understanding of the design decisions taken, and a number of general conclusions were drawn. Though many differences in design approaches were found in the presentations, a number of common features could also be identified. These included design approaches to achieve further improvements with respect to safety, design simplification, reduction in cost, incorporation of feedback from operating experience, and control room improvements regarding human factors and digitization. Design approaches to achieve further improvements in safety included consideration of severe accidents in the design process, increased thermal margins and water inventories, longer grace periods and double containments. Refs, figs and tabs.

  13. Evaluation and review of planning for greater-confinement disposal by the Independent Peer Review Committee, July 9-10, 1985. Final report

    International Nuclear Information System (INIS)

    1985-07-01

    This evaluation and review was performed under contract by Argonne National Laboratory in support of their role for developing the ''Planning for Greater Confinement Disposal'' Document for the Low-Level Waste Management Program Office for the Department of Energy, Office of Defense Waste and Byproducts Management. The Independent Peer Review Committee was composed of 13 well-qualified and recognized experts in their fields and pertinent disciplines, collectively representing considerable expertise and experience in waste disposal operations, waste management, environmental assessment and impact analysis, and other aspects of radioactive waste disposal. The members of the Peer Review Committee, their organizations, and thier area of expertise are given in Appendix 1. The general consensus of the Independent Review Committee was that the ''Planning for Greater-Confinement Disposal'' document was reasonably comprehensive, covering nearly all topics necessary to provide a good planning guide. There is, however, a definite need to reorganize the document into two volumes with appendices and the relationship of the GCD document to other LLWMP documents needs to be clarified in the introductory volume. Specific recommendations made by the committee on the DCD document are given in Section 3.2. Recommendations by the committee that have a somewhat broader scope than just the GCD document are given in Section 3.3

  14. Field review of fish habitat improvement projects in central Idaho

    International Nuclear Information System (INIS)

    Beschta, R.L.; Griffith, J.; Wesche, T.A.

    1993-05-01

    The goal of this field review was to provide information to the Bonneville Power Administration (BPA) regarding previous and ongoing fish habitat improvement projects in central Idaho. On July 14, 1992, the review team met at the Sawtooth National Recreation Area office near Ketchum, Idaho, for a slide presentation illustrating several habitat projects during their construction phases. Following the slide presentation, the review team inspected fish habitat projects that have been implemented in the last several years in the Stanley Basin and adjacent valleys. At each site the habitat project was described to the field team and a brief period for project inspection followed. The review team visited approximately a dozen sites on the Challis, Sawtooth, and Boise National Forests over a period of approximately two and a half days. There are two objectives of this review namely to summarize observations for specific field sites and to provide overview commentary regarding the BPA habitat improvement program in central Idaho

  15. MHD Technology Transfer, Integration and Review Committee. Seventh semi-annual status report, April 1991--September 1991

    Energy Technology Data Exchange (ETDEWEB)

    1993-02-01

    This seventh semi-annual status report of the MHD Technology Transfer, Integration and Review Committee (TTIRC) summarizes activities of the TTIRC during the period April 1991 through September 1991. It includes a summary and minutes of the General Committee meeting, progress summaries of ongoing POC contracts, discussions pertaining to technical integration issues in the POC program, and planned activities for the next six months. The meeting included test plan with Western coal, seed regeneration economics, power management for the integrated topping cycle and status of the Clean Coal Technology Proposal activities. Appendices cover CDIF operations HRSR development, CFFF operations etc.

  16. Post-project market review as a tool for stimulating commercialisation of knowledge creation projects

    NARCIS (Netherlands)

    Bout, L.Y.; Lombaers, J.H.M.; Constantinides, E.; Weerd-Nederhof, P.C. de

    2009-01-01

    Post-Project Reviews are mainly used as a tool to improve organisational learning (Busby, 1999; von Zedtwitz, 2002). However, the concept of post-project review can also be used as a tool to identify new market potential and to hand over technical knowledge from technical to marketing personnel (von

  17. Post-Project Market Review as a Tool for Stimulating Commercialisation of Knowledge Creation Projects

    NARCIS (Netherlands)

    Bout, Y.; Lombaers, Jaap H.M.; Constantinides, Efthymios; Fisscher, O.A.M.; de Weerd-Nederhof, Petronella C.; Oakey, R.; Groen, A.; Cook, G.; van der Sijde, P.

    2009-01-01

    Post-Project Reviews are mainly used as a tool to improve organisational learning (Busby, 1999; von Zedtwitz, 2002). However, post-project reviews can also be used as a tool to identify new market potential and to hand over technical knowledge from technical to marketing personnel (von Zedtwitz,

  18. Radioactive Operations Committee Review of the Intermediate-Level Waste Evaporator Facility, Building 2531 February 17, 1972

    International Nuclear Information System (INIS)

    Liberman, B.; Brooksbank, R.E.

    1972-01-01

    A subcommittee of the Radioactive Operations Committee met with the Operators of the Intermediate Level Waste Evaporator Facility on February 17, 1972, to discuss the status of the facility and its operations since the review of October 7, 1970, and reported in ORNL-CF-70-11-12. This review was made to determine the status of the ILWEF since the last review, to discuss compliance with previously recommended changes, and to review any new items of safety significance. Several recommendations were made.

  19. Reuse of samples: ethical issues encountered by two institutional ethics review committees in Kenya.

    Science.gov (United States)

    Langat, Simon K

    2005-10-01

    There is growing concern about the reuse and exploitation of biological materials (human tissues) for use in research worldwide. Most discussions about samples have taken place in developed countries, where genetic manipulation techniques have greatly advanced in recent years. There is very little discussion in developing countries, although collaborative research with institutions from developed countries is on the increase. The study sought to identify and describe ethical issues arising in the storage, reuse and exportation of samples in a developing country. Research protocols presented to two Ethics Review Committees in Kenya during a period of two years were reviewed. A record was made of the protocol title, sample collected, request for storage, reuse or exportation and whether or not subject consent was sought. The findings indicated that about 25% out of the 388 protocols sought permission for reuse and only half of those actually informed subjects of the contemplated re-use. Less than 20% requested storage and again, about half of them sought consent from subjects. There is an indication that investigators do not see the need to seek consent for storage, reuse and exportation of samples. It is proposed that these issues should be addressed through policy interventions at both the national and global levels.

  20. Annual review of research projects 1980

    International Nuclear Information System (INIS)

    Keam, D.W.

    1981-11-01

    The Australian Radiation Laboratory is a national centre concerned with the public and occupational health aspects of the use of both ionising and non-ionising radiation. Thirty two projects which were in progress during 1980 are described

  1. Environmental standards and project construction: A review

    International Nuclear Information System (INIS)

    Mason, P.F.; Thornberry, H.L.

    1991-01-01

    In the past decade, changes have occurred in the area of environmental regulation. This paper identifies the typical environmental standards applicable to project construction, recent environmental regulatory issues and trends, and identifies new environmental issues which must be considered in project construction. These include (1) handling hazardous chemicals in the workplace, (2) construction at formerly utilized sites, (3) disposal of debris, construction materials and hazardous waste, and (4) training and experience of construction personnel in environmental issues

  2. Application of project design peer review to improve quality assurance

    International Nuclear Information System (INIS)

    McClure, F.E.

    1989-01-01

    DOE ORDER 5481.1B Safety Analysis and Review Systems and DOE ORDER 6430.1A General Design Criteria require that the design of facilities shall incorporate the necessary Quality Assurance review requirements to assure that the established program quality assurance objectives are met in the design criteria and the construction documents. The use of Project Design Peer Review to satisfy these requirements is presented. The University of California manages the Lawrence Berkeley Laboratory, the Lawrence Livermore National Laboratory, and the Los Alamos National Scientific Laboratory. The 1988 University Seismic Safety Policy requires the use of independent Project Design Peer Review in its capital improvement and seismic reconstruction program

  3. 75 FR 49457 - Amador County Resource Advisory Committee

    Science.gov (United States)

    2010-08-13

    ... and Community Self-Determination Act (Pub. L. 110-343) and in compliance with the Federal Advisory Committee Act. The RAC will review project proposals submitted by the Forest Service and the public, listen... meeting the RAC will review project proposals submitted by the Forest Service and the public, listen to...

  4. Annual review of research projects 1984

    International Nuclear Information System (INIS)

    Keam, D.W.

    1986-02-01

    This progress report provides a brief outline of current laboratory research and development projects and their present status. Research fields covered are: uranium, radon and its daughters, radiation effects in solids and gases, x-rays and clinical dosimetry, measurement standards in radiation dosimetry, radiopharmaceuticals and nuclear medicine, non-ionizing electromagnetic radiations, environmental radiochemistry and radiation monitoring

  5. Annual review of research projects 1983

    International Nuclear Information System (INIS)

    1985-08-01

    This progress report provides a brief outline of current laboratory research and development projects and their present status. Research fields covered are: uranium, radon and its daughters, radiation effects in solids and gases, thermoluminescence, x-rays and clinical dosimetry, measurement standards in radiation dosimetry, radiopharmaceuticals and nuclear medicine, radionuclide metrology, non-ionizing electromagnetic radiations, environmental radiochemistry and radiation monitoring

  6. Licensing Review in R+D Projects

    OpenAIRE

    Alessandro, Orsi

    2014-01-01

    FOSS packages are becoming ever more present in R&D projects carried out a variety of entities, including large corporations. I will focus on how legal risks associated with the use of FOSS licenses can be assessed and discuss measures directed to risk mitigation.

  7. Review of BPA funded sturgeon, resident fish and wildlife projects

    International Nuclear Information System (INIS)

    1990-12-01

    The Bonneville Power Administration (BPA) held a public meeting on November 19--21, 1991, for the purpose of review, coordination, and consultation of the BPA-funded projects for sturgeon, resident fish, and wildlife in the Columbia River Basin (Basin). The comments received after the meeting were favorable and the participants agreed that the meeting was stimulating and productive. The information exchanged should lead to better coordination with other projects throughout the Basin. This document list the projects by title, the project leaders and BPA's project officers, and an abstract of each leader's presentation

  8. Ethics review of studies during public health emergencies - the experience of the WHO ethics review committee during the Ebola virus disease epidemic.

    Science.gov (United States)

    Alirol, Emilie; Kuesel, Annette C; Guraiib, Maria Magdalena; de la Fuente-Núñez, Vânia; Saxena, Abha; Gomes, Melba F

    2017-06-26

    Between 2013 and 2016, West Africa experienced the largest ever outbreak of Ebola Virus Disease. In the absence of registered treatments or vaccines to control this lethal disease, the World Health Organization coordinated and supported research to expedite identification of interventions that could control the outbreak and improve future control efforts. Consequently, the World Health Organization Research Ethics Review Committee (WHO-ERC) was heavily involved in reviews and ethics discussions. It reviewed 24 new and 22 amended protocols for research studies including interventional (drug, vaccine) and observational studies. WHO-ERC provided the reviews within on average 6 working days. The WHO-ERC often could not provide immediate approval of protocols for reasons which were not Ebola Virus Disease specific but related to protocol inconsistencies, missing information and complex informed consents. WHO-ERC considerations on Ebola Virus Disease specific issues (benefit-risk assessment, study design, exclusion of pregnant women and children from interventional studies, data and sample sharing, collaborative partnerships including international and local researchers and communities, community engagement and participant information) are presented. To accelerate study approval in future public health emergencies, we recommend: (1) internally consistent and complete submissions with information documents in language participants are likely to understand, (2) close collaboration between local and international researchers from research inception, (3) generation of template agreements for data and sample sharing and use during the ongoing global consultations on bio-banks, (4) formation of Joint Scientific Advisory and Data Safety Review Committees for all studies linked to a particular intervention or group of interventions, (5) formation of a Joint Ethics Review Committee with representatives of the Ethics Committees of all institutions and countries involved to

  9. Ethics Review Committee approval and informed consent: an analysis of biomedical publications originating from Sri Lanka

    Directory of Open Access Journals (Sweden)

    Siriwardhana Chesmal

    2008-02-01

    Full Text Available Abstract Background International guidelines on research have focused on protecting research participants. Ethical Research Committee (ERC approval and informed consent are the cornerstones. Externally sponsored research requires approval through ethical review in both the host and the sponsoring country. This study aimed to determine to what extent ERC approval and informed consent procedures are documented in locally and internationally published human subject research carried out in Sri Lanka. Methods We obtained ERC approval in Sri Lanka and the United Kingdom. Theses from 1985 to 2005 available at the Postgraduate Institute of Medicine (PGIM library affiliated to the University of Colombo were scrutinised using checklists agreed in consultation with senior research collaborators. A Medline search was carried out with MeSH major and minor heading 'Sri Lanka' as the search term for international publications originating in Sri Lanka during 1999 to 2004. All research publications from CMJ during 1999 to 2005 were also scrutinized. Results Of 291 theses, 34% documented ERC approvals and 61% documented obtaining consent. From the international journal survey, 250 publications originated from Sri Lanka of which only 79 full text original research publications could be accessed electronically. Of these 38% documented ERC approval and 39% documented obtaining consent. In the Ceylon Medical Journal 36% documented ERC approval and 37% documented obtaining consent. Conclusion Only one third of the publications scrutinized recorded ERC approval and procurement of informed consent. However, there is a positive trend in documenting these ethical requirements in local postgraduate research and in the local medical journal.

  10. [Intradiverticular bladder tumours: review of the Cancer Committee of the French Association of Urology].

    Science.gov (United States)

    Neuzillet, Y; Comperat, E; Rouprêt, M; Larre, S; Roy, C; Quintens, H; Houede, N; Pignot, G; Wallerand, H; Soulie, M; Pfister, C

    2012-07-01

    Cancer Committee of the French Association of Urology (CCAFU) conducted a review of the epidemiology, diagnosis and treatment of intradiverticular bladder tumours (TVID) and proposed therapeutic management. A bibliographic research in French and English using Medline(®) with the keywords "tumor", "bladder" and "diverticulum" was performed. TVID are more frequently of stage T ≥ 3a and with non urothelial histology than classical bladder tumors. At diagnosis, the risk of underestimation of the extent and multifocality of the tumor was described. Their prognosis, that was more pejorative than conventional tumors, should impelled to limit the indications of conservative treatment. The evidence levels of analyzed publications were low, with C level according to Sackett score. the specificities of the TVID have lead the CCAFU to propose specific therapeutic guidelines, based on poor evidence level. Ta-T1 low grade TVID can be treated by transurethral resection alone or followed by BCG therapy in cases of associated carcinoma in situ. High-grade TVID, unifocal and without associated carcinoma in situ, can be treated by diverticulectomy associated with pelvic lymphadenectomy. High grade TVID, multiple or associated with carcinoma in situ, warranted total cystectomy. Copyright © 2012 Elsevier Masson SAS. All rights reserved.

  11. A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-06-01

    Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region.

  12. A desk evaluation review of project URT/5/007 tsetse fly eradication. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    Project URT/5/007 was initiated in 1984 to assist the Government of the United Republic of Tanzania in developing membrane feeding technology for the mass breeding of tsetse flies, which is required for the application of the sterile insect technique to eradicate the tsetse fly from the island of Zanzibar. As the project progressed the objectives focused on the development of inter-related management practices with SIT to control and eventually eradicate the tsetse species infesting Zanzibar. As depicted by the project title, tsetse fly eradication on Zanzibar is the ultimate goal of on-going work of project URT/5/007; however, tsetse fly eradication is not the immediate objective of this project. The total budget of the project for the years 1984 through 1994 includes 53 man-months of expert services, $402,755 for equipment, and $1,959 for fellowship training. Additional funds for 57 man-months of fellowship training were provided from sources outside of the project. Resources provided by the United Republic of Tanzania for the project included staff, local facilities, and local running costs. A Desk Evaluation Review (DER) of Project URT/5/007 was requested by the Africa Section to provide an assessment of project achievements and to determine to what end the project may lead in the near future. Also the review could help determine how experiences gained during the developments of this project might be utilized in the management and implementation of similar projects in Tanzania or the region

  13. 76 FR 1594 - Amador County Resource Advisory Committee

    Science.gov (United States)

    2011-01-11

    ... meeting the RAC will review project proposals submitted by the Forest Service and the public, listen to... and Community Self-Determination Act (Pub. L. 110-343) and in compliance with the Federal Advisory Committee Act. Project proposals will be discussed and voted on to determine which projects will be...

  14. Review of Ruegen herring larvae survey project 2011

    NARCIS (Netherlands)

    Dickey-Collas, M.; Nash, R.D.M.

    2011-01-01

    At the request of the Johann Heinrich von Thünen Institut (vTI), IOR Rostock, a return review of the German Rügen herring larval survey (RHLS) project took place on the 24th to 26th January 2011, following on from a similar review in November 2006. Mark Dickey-Collas (Wageningen IMARES) and Richard

  15. A review of the role and remit of the committee on climate change

    International Nuclear Information System (INIS)

    McGregor, Peter G.; Kim Swales, J.; Winning, Matthew A.

    2012-01-01

    Domestic action on climate change requires a combination of solutions, in terms of institutions and policy instruments. One way of achieving government carbon policy goals may be the creation of an independent body to advise on, or set, monitor policy. This paper critically assesses the Committee on Climate Change (CCC), which was created in 2008 as an independent body to help move the UK towards a low-carbon economy. We look at the motivation for its creation. In particular we consider its ability to overcome a time-inconsistency problem by comparing it to another independent body, the Monetary Policy Committee of the Bank of England. In practice the CCC appears to be the “inverse” of the Monetary Policy Committee, in that it advises on what the policy goal should be rather than being held responsible for achieving it. The CCC incorporates both advisory and monitoring functions to inform government and achieve a credible carbon policy over a long time frame. This is a similar framework to that adopted by , but the CCC operates on a continuing basis and also incorporates a unique climate change monitoring function. - Highlights: ► Compares Committee on Climate Change with Monetary Policy Committee to solve time-inconsistency. ► No delegation of independent instrument to Committee on Climate Change. ► Committee on Climate Change best viewed as a continuous version of the Stern Report. ► Also additional monitoring function to check government progress on climate change.

  16. Annual review of research projects 1985

    International Nuclear Information System (INIS)

    Keam, D.W.

    1987-04-01

    This progress report provides a brief outline of current Laboratory research and development projects and their present status. The material has been grouped into the following fields: uranium, radon and its daughters; radiation effects in solids and gases; x-rays and clinical dosimetry, measurement standards in radiation dosimetry; radiopharmaceuticals and nuclear medicine; non-ionising electromagnetic radiation; environmental radiochemistry and radiation monitoring. The last category includes residual radioactive contamination at Maralinga, Emu and the Monte Bello Islands from British nuclear weapons tests in Australia, and the public health impact of fall-out from those tests

  17. Report from the Committee of Visitors on its Review of the Processes and Procedures used to Manage the Theory and Computations Program, Fusion Energy Sciences Advisory Committee

    International Nuclear Information System (INIS)

    2004-01-01

    A Committee of Visitors (COV) was formed to review the procedures used by the Office of Fusion Energy Sciences to manage its Theory and Computations program. The COV was pleased to conclude that the research portfolio supported by the OFES Theory and Computations Program was of very high quality. The Program supports research programs at universities, research industries, and national laboratories that are well regarded internationally and address questions of high relevance to the DOE. A major change in the management of the Theory and Computations program over the past few years has been the introduction of a system of comparative peer review to guide the OFES Theory Team in selecting proposals for funding. The COV was impressed with the success of OFES in its implementation of comparative peer review and with the quality of the reviewers chosen by the OFES Theory Team. The COV concluded that the competitive peer review process has improved steadily over the three years that it has been in effect and that it has improved both the fairness and accountability of the proposal review process. While the COV commends OFES in its implementation of comparative review, the COV offers the following recommendations in the hope that they will further improve the comparative peer review process: The OFES should improve the consistency of peer reviews. We recommend adoption of a results-oriented scoring system in their guidelines to referees (see Appendix II), a greater use of review panels, and a standard format for proposals; The OFES should further improve the procedures and documentation for proposal handling. We recommend that the folders documenting funding decisions contain all the input from all of the reviewers, that OFES document their rationale for funding decisions which are at variance with the recommendation of the peer reviewers, and that OFES provide a Summary Sheet within each folder; The OFES should better communicate the procedures used to determine funding

  18. RPERT: Repetitive-Projects Evaluation and Review Technique

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2014-03-01

    Full Text Available Estimating expected completion probability of any repetitive construction project with a specified/certain duration including repetitive identical activities by using program evaluation and review technique is the most essential part in construction areas since the activities were had optimistic, most likely and pessimistic durations. This paper focuses on the calculation of expected completion probability of any repetitive construction project within a specified/certain duration (contract duration by using Line Of Balance technique (LOB in case of single or multiple number of crews integrated with Program Evaluation and Review Technique (PERT. Repetitive-Projects Evaluation and Review Technique (RPERT, which is a simplified software, will generate the expected project completion probability of a specified/certain duration (contract duration. RPERT software is designed by java programming code system to provide a number of new and unique capabilities, including: (1 Viewing the expected project completion probability according to a set of specified durations per each identical activity (optimistic time, most likely time, and pessimistic time in the analyzed project; (2 Providing seamless integration with available project time calculations. In order to provide the aforementioned capabilities of RPERT, the system is implemented and developed in four main modules: (1 A user interface module; (2 A database module; (3 A running module; and (4 A processing module. At the end, an illustrative example will be presented to demonstrate and verify the applications of proposed software (RPERT, by using probabilistic calculations for repetitive construction projects.

  19. Contractor firm strategies in delivering green project: A review

    Science.gov (United States)

    Powmya, Ayisha; Abidin, Nazirah Zainul; Azizi, Nurul Sakina Mokhtar

    2017-10-01

    Building green requires effort from various parties, from those who plan, design, manage and construct the building. Contractors are responsible for converting the design on paper into a real building and their role at the construction site support environmental sustainability by implementing responsible construction practices. Inefficient or inexperienced contractor in green construction project may find that delivering this type of project is not an easy task due to added requirement in design, stringent practices at site and the use of green technology and materials. Adopting suitable strategies at firm level will assist in preparatory process and readiness of delivering the green project. This paper reviews the strategies at firm level to deliver green construction project. From extensive literature review, it was discovered that there are six strategies to be adopted by the contractor. Understanding these strategies is expected to promote more contractors to be proactive in delivering green projects.

  20. A review of the possible future HEP Accelerator Projects

    CERN Multimedia

    CERN. Geneva

    2010-01-01

    The review, as already invited for presentation at the recent International Conference on High Energy Physics (ICHEP2010), covers all accelerator projects presently envisaged for HEP in the near and mid-term future. After a brief description of the major motivation, issues and necessary R&D of each project, it specially emphasizes the synergies between the different projects and their R&D issues, pointing out their complementarities and the efficient collaborative approach to address them. It finally summarizes the relative schedule of the various projects in their different phases, pointing out their global interdependence.

  1. Annual review of research projects 1987

    International Nuclear Information System (INIS)

    Keam, D.W.

    1989-04-01

    The Australian Radiation Laboratory is a national laboratory whose function is to assist the users of radiation, and those who regulate its use, to ensure that wherever radiation is encountered, it is managed in the safest possible way. In performing this function the Laboratory conducts a varied program of applied research in areas which have implications for occupational or public health. This progress report provides a brief outline of current Laboratory research and development projects and their present status. The material is grouped into the following research fields: uranium, radon and its daughters; environmental radiation monitoring; radiopharmaceuticals and nuclear medicine; X-ray and clinical dosimetry; radionuclide metrology; non-ionising electromagnetic radiations; measurement standards in radiation dosimetry; and radiation effects in solids and gases. Refs., figs., tabs

  2. 76 FR 12315 - Committees on Collaborative Governance, Regulation, Rulemaking, Judicial Review, and Adjudication

    Science.gov (United States)

    2011-03-07

    ... (including information about remote access and obtaining special accommodations for persons with disabilities), and how to submit comments to the committee can be found in the ``Research'' section of the ACUS Web...

  3. 76 FR 18144 - Committees on Administration & Management, Collaborative Governance, and Judicial Review

    Science.gov (United States)

    2011-04-01

    ... accommodations for persons with disabilities), and how to submit comments to the committee can be found in the ``Research'' section of the ACUS Web site, at http://www.acus.gov . Comments may be submitted by e-mail to...

  4. How do we know that research ethics committees are really working? The neglected role of outcomes assessment in research ethics review

    Directory of Open Access Journals (Sweden)

    Bouësseau Marie-Charlotte

    2008-03-01

    Full Text Available Abstract Background Countries are increasingly devoting significant resources to creating or strengthening research ethics committees, but there has been insufficient attention to assessing whether these committees are actually improving the protection of human research participants. Discussion Research ethics committees face numerous obstacles to achieving their goal of improving research participant protection. These include the inherently amorphous nature of ethics review, the tendency of regulatory systems to encourage a focus on form over substance, financial and resource constraints, and conflicts of interest. Auditing and accreditation programs can improve the quality of ethics review by encouraging the development of standardized policies and procedures, promoting a common base of knowledge, and enhancing the status of research ethics committees within their own institutions. However, these mechanisms focus largely on questions of structure and process and are therefore incapable of answering many critical questions about ethics committees' actual impact on research practices. The first step in determining whether research ethics committees are achieving their intended function is to identify what prospective research participants and their communities hope to get out of the ethics review process. Answers to this question can help guide the development of effective outcomes assessment measures. It is also important to determine whether research ethics committees' guidance to investigators is actually being followed. Finally, the information developed through outcomes assessment must be disseminated to key decision-makers and incorporated into practice. This article offers concrete suggestions for achieving these goals. Conclusion Outcomes assessment of research ethics committees should address the following questions: First, does research ethics committee review improve participants' understanding of the risks and potential benefits of

  5. Projective geometry solved problems and theory review

    CERN Document Server

    Fortuna, Elisabetta; Pardini, Rita

    2016-01-01

    This book starts with a concise but rigorous overview of the basic notions of projective geometry, using straightforward and modern language. The goal is not only to establish the notation and terminology used, but also to offer the reader a quick survey of the subject matter. In the second part, the book presents more than 200 solved problems, for many of which several alternative solutions are provided. The level of difficulty of the exercises varies considerably: they range from computations to harder problems of a more theoretical nature, up to some actual complements of the theory. The structure of the text allows the reader to use the solutions of the exercises both to master the basic notions and techniques and to further their knowledge of the subject, thus learning some classical results not covered in the first part of the book. The book addresses the needs of undergraduate and graduate students in the theoretical and applied sciences, and will especially benefit those readers with a solid grasp of ...

  6. A desk evaluation review of project RAF/4/004 nuclear instruments maintenance. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-04-15

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the outputs of a project. This project was originally intended for six selected countries in Africa, namely, Algeria, Egypt, Ghana, Libya, Zaire and Zambia. Ethiopia and Tanzania joined in 1993 and it has now been extended to two other countries, Madagascar and Sudan. This is a step forward towards developing the infrastructure for nuclear instrumentation and maintenance is as many countries in Africa as require this service. A project summary along with financial data and recommendations for improvements are given. A table where total assistance provided to ten selected african countries is included.

  7. A desk evaluation review of project RAF/4/004 nuclear instruments maintenance. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the outputs of a project. This project was originally intended for six selected countries in Africa, namely, Algeria, Egypt, Ghana, Libya, Zaire and Zambia. Ethiopia and Tanzania joined in 1993 and it has now been extended to two other countries, Madagascar and Sudan. This is a step forward towards developing the infrastructure for nuclear instrumentation and maintenance is as many countries in Africa as require this service. A project summary along with financial data and recommendations for improvements are given. A table where total assistance provided to ten selected african countries is included

  8. Lessons Learned about Post-Tenure Review from the AAHE Peer Review of Teaching Project.

    Science.gov (United States)

    Taylor, James W.

    1999-01-01

    Describes use of a strategy adapted from the American Association for Higher Education's Peer Review of Teaching Project, the "reflective memo," to provide backward and forward view of post-tenure reviews in the chemistry department of the University of Wisconsin (Madison). The approach served as a guide in review of research, teaching,…

  9. The Challenge of Timely, Responsive and Rigorous Ethics Review of Disaster Research: Views of Research Ethics Committee Members.

    Directory of Open Access Journals (Sweden)

    Matthew Hunt

    Full Text Available Research conducted following natural disasters such as earthquakes, floods or hurricanes is crucial for improving relief interventions. Such research, however, poses ethical, methodological and logistical challenges for researchers. Oversight of disaster research also poses challenges for research ethics committees (RECs, in part due to the rapid turnaround needed to initiate research after a disaster. Currently, there is limited knowledge available about how RECs respond to and appraise disaster research. To address this knowledge gap, we investigated the experiences of REC members who had reviewed disaster research conducted in low- or middle-income countries.We used interpretive description methodology and conducted in-depth interviews with 15 respondents. Respondents were chairs, members, advisors, or coordinators from 13 RECs, including RECs affiliated with universities, governments, international organizations, a for-profit REC, and an ad hoc committee established during a disaster. Interviews were analyzed inductively using constant comparative techniques.Through this process, three elements were identified as characterizing effective and high-quality review: timeliness, responsiveness and rigorousness. To ensure timeliness, many RECs rely on adaptations of review procedures for urgent protocols. Respondents emphasized that responsive review requires awareness of and sensitivity to the particularities of disaster settings and disaster research. Rigorous review was linked with providing careful assessment of ethical considerations related to the research, as well as ensuring independence of the review process.Both the frequency of disasters and the conduct of disaster research are on the rise. Ensuring effective and high quality review of disaster research is crucial, yet challenges, including time pressures for urgent protocols, exist for achieving this goal. Adapting standard REC procedures may be necessary. However, steps should be

  10. Final design review report for K basin dose reduction project

    International Nuclear Information System (INIS)

    Blackburn, L.D.

    1996-01-01

    The strategy for reducing radiation dose originating from radionuclides absorbed in the K East Basin concrete is to raise the pool water level to provide additional shielding. This report documents a final design review for cleaning/coating basin walls and modifying other basin components where appropriate. The conclusion of this review was that the documents developed constitute an acceptable design for the Dose Reduction Project

  11. Design for Sustainability and Project Management Literature – A Review

    DEFF Research Database (Denmark)

    Ali, Faheem; Boks, Casper; Bey, Niki

    2016-01-01

    management literature has hardly been considered in design for sustainability research, this article attempts to review the points of intersection between these two fields, and explores the potential that knowledge from project management literature has in improving efficiency and effectiveness...... of development and implementation of design for sustainability tools.......The growing pressure on natural resources and increasing global trade have made sustainability issues a prime area of concern for all businesses alike. The increased focus on sustainability has impacted the way projects are conceived, planned, executed and evaluated in industries. Since project...

  12. First interim project review meeting on management of water hyacinth

    International Nuclear Information System (INIS)

    1980-01-01

    The first project planning meeting was held in New Delhi during 1978 and the second, a project review meeting, in Papua New Guinea during June 1979, both funded by UNEP. Reports from the regional coordinators for Bangladesh, Malaysia, Sri Lanka, Fiji and India are presented. Also presented are reports from the national coordinators for Malaysia, Bangladesh and India. Two visits (a visit to India, Bangladesh and Sri Lanka to study the feasibility of making a film on the work done with water hyacinth and a visit to the U.S. by the regional project coordinator) are also described

  13. Financing Renewable Energy Projects in Developing Countries: A Critical Review

    Science.gov (United States)

    Donastorg, A.; Renukappa, S.; Suresh, S.

    2017-08-01

    Access to clean and stable energy, meeting sustainable development goals, the fossil fuel dependency and depletion are some of the reasons that have impacted developing countries to transform the business as usual economy to a more sustainable economy. However, access and availability of finance is a major challenge for many developing countries. Financing renewable energy projects require access to significant resources, by multiple parties, at varying points in the project life cycles. This research aims to investigate sources and new trends in financing RE projects in developing countries. For this purpose, a detail and in-depth literature review have been conducted to explore the sources and trends of current RE financial investment and projects, to understand the gaps and limitations. This paper concludes that there are various internal and external sources of finance available for RE projects in developing countries.

  14. The Ongkharak Nuclear Research Center (ONRC) research reactor project: a status review

    International Nuclear Information System (INIS)

    Rusch, R.; Jacobi, A. Jr.; Yamkate, P.

    2001-01-01

    The new Ongkharak Nuclear Research Center in the vicinity of Bangkok, Thailand is planned to replace the more than 30 years old facilities located in the Chatuchak district, Bangkok. An international team led by general atomics (GA) is designing and constructing the new research complex. It comprises a 10 MW TRIGA type reactor, an isotope production and a centralized waste processing and storage facility. Electrowatt-Ekono Ltd. was hired by the Thai Government Agency, the Office of Atomic Energy for Peace (OAEP), as a consultant to the project. As the project is now approaching the end of its 4 th year, it now stands at a decisive turning point. Basic design is nearly completed and detailed design is well advanced. The turnkey part of the contract including the reactor island, the isotope and waste facilities are still awaiting the issuance of the Construction Permit. Significant progress has been made on the other part of the project, which includes all the supporting infrastructure facilities. The Preliminary Safety Analysis Report (PSAR), prepared by GA, has been reviewed by various parties, including by nuclear safety experts from the IAEA, which has provided continuous support to the OAEP. Experts from the Argonne National Laboratory have been involved in the reviews as well. The PSAR is now under consideration at the Nuclear Facility Safety Sub-Committee (NFSS) of the Thai Atomic Energy for Peace Commission for issuing the Construction Permit of the ONRC Research Reactor. The following paper gives an overview of the project and its present status, outlining the features of the planned facilities and the issues the project is presently struggling with. Major lessons of the past 4 years are highlighted and an outlook into the future is attempted. (orig.)

  15. "The Project Cannot Be Approved in Its Current Form": Feminist Visual Research Meets the Human Research Ethics Committee

    Science.gov (United States)

    Pitt, Penelope

    2014-01-01

    This article reflects on a university human research ethics committee's unease regarding a feminist visual pilot study within the field of education. The small exploratory study proposed to explore a migrant mother's production of her son's identity through her family photograph collection. The committee requested substantial…

  16. The Virtual Factory Teaching System (VFTS): Project Review and Results.

    Science.gov (United States)

    Kazlauskas, E. J.; Boyd, E. F., III; Dessouky, M. M.

    This paper presents a review of the Virtual Factory Teaching (VFTS) project, a Web-based, multimedia collaborative learning network. The system allows students, working alone or in teams, to build factories, forecast demand for products, plan production, establish release rules for new work into the factory, and set scheduling rules for…

  17. 76 FR 60774 - Review and Approval of Projects

    Science.gov (United States)

    2011-09-30

    ... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Part 806 Review and Approval of Projects AGENCY: Susquehanna River Basin Commission. ACTION: Notice of proposed rulemaking; reopening of comment period. SUMMARY: The purpose of this document is to inform the public of an extension of the comment period for...

  18. 77 FR 14272 - Review and Approval of Projects

    Science.gov (United States)

    2012-03-09

    ... SUSQUEHANNA RIVER BASIN COMMISSION 18 CFR Part 806 Review and Approval of Projects CFR Correction In Title 18 of the Code of Federal Regulations, Part 400 to End, revised as of April 1, 2011, on page 118, in Sec. 806.6, (b)(1)(i) and (ii) are removed. [FR Doc. 2012-5837 Filed 3-8-12; 8:45 am] BILLING...

  19. 15 CFR Supplement No. 9 to Part 748 - End-User Review Committee Procedures

    Science.gov (United States)

    2010-01-01

    ... potential validated end-user is not included in calculating the 30 calendar day deadline for the ERC's... matter to the Advisory Committee on Export Policy (ACEP). The procedures and time frame for escalating... Supplement No. 7 to this part operates as clearance by all member agencies to publish the amendment in the...

  20. [Review and analysis of the review results of Taiwan nurses association nursing projects (2011~2013)].

    Science.gov (United States)

    Chang, Li-Yin; Chen, Yu-Chih; Huang, Kuang-Chi; Huang, Jui-Lan; Lee, Tso-Ying

    2015-04-01

    Nursing projects are a key part of N4 professional competency training for nursing personnel. Low passage rates for these projects have been shown to negatively affect the intent of nursing personnel to advance further in the nursing ladder system. This study analyzes the scores for nursing projects between 2011 and 2013, the passage rate for these projects, and the differences in passage rates between different types of projects. This retrospective and descriptive study collected data on nursing projects conducted under the auspices of the Taiwan Nurses Association between 2011 and 2013. Furthermore, the comments of reviewers on 100 nursing projects were randomly selected and subjected to content analysis. A total of 3,359 nursing projects were examined. Eliminating unqualified nursing projects left a total of 3,246 projects for the dataset. A total of 1,099 projects were scored with passing grades, giving a passing rate of 33.9%. The authors of these passing projects worked primarily in northern Taiwan, worked in medical centers, and worked in intensive care departments. The projects submitted by authors in central Taiwan had the highest average score and passing rate, while those living in offshore islands had the lowest average score and passing rate. Most of the project topics belonged to the category: "improvement of nursing service skills or quality" (77.3%). Items with the lowest scores were: validation of questions, analysis of the current situation, and evaluation of results. The topics of nursing projects did not relate significantly to passing rate. However, years of experience, geographic location of hospital, level of institution, and department each had a statistically significant impact on the passage rate. A content analysis of reviewer comments was used to extract common problems. Most of the positive comments were related to the category of "literature review and reference", while most of the negative comments were related to the categories of

  1. The sustainable project management: A review and future possibilities

    Directory of Open Access Journals (Sweden)

    V.K. Chawla

    2018-06-01

    Full Text Available Sustainability in project operations such as financial, social and environmental sustainability is one of the most prominent issues of the present times to address. The increased focus on sus-tainable business operations has changed the viewpoint of researchers and corporate community towards the project management. Today sustainability in business operations along with sustain-ability of natural and environmental resources are of paramount significance which has further caused a huge impact on conception, planning, scheduling and execution of the project manage-ment activities. In this paper, a literature review between 1987 and 2018 on different issues af-fecting the sustainability in project management is carried out. The present study also identifies and discusses the future possibilities to apply computational procedures in order to estimate and optimize the sustainability issues in the management of projects, for example the computational evolutionary algorithms can be applied to formulate the multi-objective decision-making problem after considering critical factors of sustainability in the projects and then yielding optimized solu-tions for the formulated problem to achieve sustainability in the projects. A new integrated framework with the inclusion of feedback function for assessment of each decision and actions taken towards the sustainability of the projects is also identified and presented.

  2. Integrating natural language processing expertise with patient safety event review committees to improve the analysis of medication events.

    Science.gov (United States)

    Fong, Allan; Harriott, Nicole; Walters, Donna M; Foley, Hanan; Morrissey, Richard; Ratwani, Raj R

    2017-08-01

    Many healthcare providers have implemented patient safety event reporting systems to better understand and improve patient safety. Reviewing and analyzing these reports is often time consuming and resource intensive because of both the quantity of reports and length of free-text descriptions in the reports. Natural language processing (NLP) experts collaborated with clinical experts on a patient safety committee to assist in the identification and analysis of medication related patient safety events. Different NLP algorithmic approaches were developed to identify four types of medication related patient safety events and the models were compared. Well performing NLP models were generated to categorize medication related events into pharmacy delivery delays, dispensing errors, Pyxis discrepancies, and prescriber errors with receiver operating characteristic areas under the curve of 0.96, 0.87, 0.96, and 0.81 respectively. We also found that modeling the brief without the resolution text generally improved model performance. These models were integrated into a dashboard visualization to support the patient safety committee review process. We demonstrate the capabilities of various NLP models and the use of two text inclusion strategies at categorizing medication related patient safety events. The NLP models and visualization could be used to improve the efficiency of patient safety event data review and analysis. Copyright © 2017 Elsevier B.V. All rights reserved.

  3. SPI Project Criticality Task Force initial review and assessment

    International Nuclear Information System (INIS)

    McKinley, K.B.; Cannon, J.W.; Marsden, R.S.; Worle, H.A.

    1980-03-01

    The Slagging Pyrolysis Incinerator (SPI) Facility is being developed to process transuranic waste stored and buried at the Idaho National Engineering Laboratory (INEL) into a chemically inert, physically stable, basalt-like residue acceptable for a Federal Repository. A task force was established by the SPI Project Division to review and assess all aspects of criticality safety for the SPI Facility. This document presents the initial review, evaluations, and recommendations of the task force and includes the following: background information on waste characterization, and criticality control approaches and philosophies, a description of the SPI Facility Waste Processing Building, a review and assessment of potentially relevant codes and regulations; a review and assessment of the present state of criticality and assaying/monitoring studies, and recommendations for changes in and additions to these studies. The review and assessment of potentially relevant codes and regulations indicate that ERDAM 0530, Nuclear Criticality Safety should be the controlling document for criticality safety for the SPI Project. In general, the criticality control approaches and philosophies for the SPI Project comply with this document

  4. Review on Population Projection Methodology for Radiological Dose Assessment

    Energy Technology Data Exchange (ETDEWEB)

    Jang, M. S.; Kang, H. S.; Kim, S. R. [NESS, Daejeon (Korea, Republic of); Hwang, W. T. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Yang, Y. H. [KHNP, Daejeon (Korea, Republic of)

    2015-05-15

    Radiation environment report (RER), one of the essential documents in plant operating license or continuous operation license, includes population projection. Population estimates are utilized in determining the collective dose at the operation or restart time of nuclear power plant. Many population projection models are suggested and also under development. We carried out the sensitivity analysis on various population projection models to Daejeon city as a target. Daejeon city showed the increase or decrease in the cross-sectional population, because of the development of Sejong city, Doan new town and etc. We analyzed the population of Daejeon city using statistical ARIMA model and various simple population projection models. It is important to determine the population limit in Modified exponential model but it is not easy. Therefore, the various properties of the area such as the decrease and increase of population, new town development plan, social and natural environment change and etc., should be carefully reviewed to estimate the future population of any area.

  5. Review on Population Projection Methodology for Radiological Dose Assessment

    International Nuclear Information System (INIS)

    Jang, M. S.; Kang, H. S.; Kim, S. R.; Hwang, W. T.; Yang, Y. H.

    2015-01-01

    Radiation environment report (RER), one of the essential documents in plant operating license or continuous operation license, includes population projection. Population estimates are utilized in determining the collective dose at the operation or restart time of nuclear power plant. Many population projection models are suggested and also under development. We carried out the sensitivity analysis on various population projection models to Daejeon city as a target. Daejeon city showed the increase or decrease in the cross-sectional population, because of the development of Sejong city, Doan new town and etc. We analyzed the population of Daejeon city using statistical ARIMA model and various simple population projection models. It is important to determine the population limit in Modified exponential model but it is not easy. Therefore, the various properties of the area such as the decrease and increase of population, new town development plan, social and natural environment change and etc., should be carefully reviewed to estimate the future population of any area

  6. Evaluation of clinical trials by Ethics Committees in Germany: Experience of applicants with the review of requests for opinion of the Ethics Committees - results of a survey among members of the German Association of Research-Based Pharmaceutical Companies (VFA

    Directory of Open Access Journals (Sweden)

    Russ, Hagen

    2009-07-01

    Full Text Available The review of requests for a positive opinion of the ethics committees (application procedure as a requirement to start a clinical trial in Germany has been completely redesigned with the transposition of EU Directive 2001/20/EC in the 12th Amendment of the German Medicines Act in August 2004. The experience of applicants (sponsors, legal representatives of sponsors in the EU and persons or organizations authorized by the sponsors to make the application, respectively in terms of interactions with the ethics committees in Germany has been positive overall, especially with respect to ethics committee adherence to the statutory timelines applicable for review of requests. However, inconsistencies between ethics committees exist in terms of the form and content of the requirements for application documents and their evaluation.With the objective of further improving both the quality of applications and the evaluation of those applications by ethics committees, a survey among members of the German Association of Research-Based Pharmaceutical Companies (VFA was conducted from January to April 2008. Based on reasoned opinions issued by the respective ethics committee in charge of the coordinating principal investigator (coordinating ethics committee, the type and frequency of formal and content-related objections to applications according to § 7 of the German Good Clinical Practice (GCP Regulation were systematically documented, and qualitative and quantitative analyses performed. 21 out of 44 members of the VFA participated in the survey. 288 applications for Phase I–IV studies submitted between January and December 2007 to 40 ethics committees were evaluated.This survey shows that about one in six applications is incomplete and has formal and/or content objections, respectively, especially those that pertain to documents demonstrating the qualification of the investigator and/or suitability of the facilities. These objections are attributable to

  7. The Greenland Analogue Project (GAP). Literature review of hydrogeology/ hydrogeochemistry

    International Nuclear Information System (INIS)

    Wallroth, Thomas; Lokrantz, Hanna; Rimsa, Andrius

    2010-09-01

    This report is produced as part of the Greenland Analogue Project (GAP), carried out as a collaboration project with the Canadian Nuclear Waste Management Organization (NWMO), Posiva Oy and the Swedish Nuclear Fuel and Waste Management Co (SKB). The overall aim of the project is to improve the current understanding of hydrogeological and hydrogeochemical processes associated with continental-scale glacial periods including with the presence of permafrost and the advance/retreat of ice sheets. The project will focus on studying how an ice sheet affects groundwater flow and water chemistry around a deep geological repository in crystalline bedrock. The Greenland Analogue Project consists of three active sub-projects (A-C) with individual objectives. Field studies are conducted in the Kangerlussuaq region, in central Western Greenland. Sub-projects A and B collectively aim at improving the understanding of ice sheet hydrology by combining investigations on surface water processes with ice sheet drilling and instrumentation. In sub-project C, the penetration of glacial melt water into the bedrock, groundwater flow and the chemical composition of water will be studied. Main planned activities in sub-project C include drilling of a deep borehole in front of the ice sheet, in which different downhole surveys, sampling and monitoring will be carried out. The primary aim of this report is to review available information about hydrogeology and hydrogeochemistry in central Western Greenland, with special emphasis on the area around Kangerlussuaq. The relevant information about this area is however very limited, and it was decided to extend the review to briefly include studies made in other regions with similar conditions in terms of geology, climate and glaciology. The number of published studies made in other areas with glaciers, ice sheets or permafrost is very large, and the review and list of references in this report is far from complete. It is also obvious that both

  8. The Greenland Analogue Project (GAP). Literature review of hydrogeology/ hydrogeochemistry

    Energy Technology Data Exchange (ETDEWEB)

    Wallroth, Thomas; Lokrantz, Hanna; Rimsa, Andrius (Bergab Consulting Geologists, Goeteborg (Sweden))

    2010-09-15

    This report is produced as part of the Greenland Analogue Project (GAP), carried out as a collaboration project with the Canadian Nuclear Waste Management Organization (NWMO), Posiva Oy and the Swedish Nuclear Fuel and Waste Management Co (SKB). The overall aim of the project is to improve the current understanding of hydrogeological and hydrogeochemical processes associated with continental-scale glacial periods including with the presence of permafrost and the advance/retreat of ice sheets. The project will focus on studying how an ice sheet affects groundwater flow and water chemistry around a deep geological repository in crystalline bedrock. The Greenland Analogue Project consists of three active sub-projects (A-C) with individual objectives. Field studies are conducted in the Kangerlussuaq region, in central Western Greenland. Sub-projects A and B collectively aim at improving the understanding of ice sheet hydrology by combining investigations on surface water processes with ice sheet drilling and instrumentation. In sub-project C, the penetration of glacial melt water into the bedrock, groundwater flow and the chemical composition of water will be studied. Main planned activities in sub-project C include drilling of a deep borehole in front of the ice sheet, in which different downhole surveys, sampling and monitoring will be carried out. The primary aim of this report is to review available information about hydrogeology and hydrogeochemistry in central Western Greenland, with special emphasis on the area around Kangerlussuaq. The relevant information about this area is however very limited, and it was decided to extend the review to briefly include studies made in other regions with similar conditions in terms of geology, climate and glaciology. The number of published studies made in other areas with glaciers, ice sheets or permafrost is very large, and the review and list of references in this report is far from complete. It is also obvious that both

  9. 76 FR 28950 - Lynn Canal/Icy Straits Resource Advisory Committee

    Science.gov (United States)

    2011-05-19

    ... protocol in the decision-making process and review, discuss, evaluate, and prioritize proposed projects... have rooms set up for the public to come in and listen to the call. Committee discussion is limited to... individuals will have the opportunity to address the Committee at that time. Dated: May 11, 2011. Chad Van...

  10. Report on the Concept Review Committee recommendations for proof-of-principle alternate concept programs

    International Nuclear Information System (INIS)

    1979-03-01

    The report is organized as follows: Section II contains a discussion of the meeting procedures used on October 16--18, 1978, and the rules employed for technical consultants and advisors to the CRC. Section III contains a discussion of the CRC recommendations and some of the factors taken into consideration by the Committee. Section IV briefly discusses where do we go from here in DOE's alternate concepts program

  11. A desk evaluation review of project RAF/9/005 radiation protection development. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    The Agency has been assisting member nations through a number of national TC projects in radiation protection and related areas over the years. In addition, a regional project RAF/9/005 - Radiation Protection Development (which is under this review) was approved in 1988, with the aim of assessing existing radiation protection practices in the African Member States in relation to the Agency's new basic safety standards for radiation protection, and to advise Governments on improvements. The project was subsequently extended up to 1994 as an umbrella project to assist all African Member States in the development of appropriate radiation protection services; to co-ordinate the implementation of the relevant national TC projects; and to develop co-operation amongst groups of Member States on a regional and sub-regional basis. Particular emphasis was to be given to manpower development through workshops, seminars and training courses in radiation protection and safety. In parallel thereto, the Agency's Radiation Protection Advisory Teams (RAPATs) visited nineteen African Member States during the period 1986 through 1993, to review and assess their radiation protection activities, identify priorities, and design long-term radiation protection programmes. RAPAT findings and recommendations were considered in drawing up programmes for implementation under project RAF/9/005

  12. Report of the evaluation by the project evaluation committee on research and development of FBR structural materials. Result intermediate evaluation in fiscal year 2002

    International Nuclear Information System (INIS)

    2003-03-01

    The project evaluation committee of FBR (Fast Breeder Reactor) and fuel cycle evaluated the problem under the evaluation method defined by the committee on the basis of material and supplementary data produced by JNC (Japan Nuclear Cycle Development Institute) and discussion. This report consists of summary, construction of the committee, investigation process, evaluation method, opinion of object, plan, research system, results, relation to practical use, public offering of results, development and others and total evaluation. Each opinion of the committee member are reported. Development of structural material is important problem of R and D of FBR. The estimation techniques of materials, high temperature structural and earthquake-resistant design techniques are evaluated to obtain the fruitful results. The remarkable results are development of materials of 316FR, using plate to reactor, estimation method of thermal striping, improvement of earthquake-resistant analysis technology, contribution to evaluation analysis of Monju second liner and basic information to develop quantity technique of material damage. (S.Y.)

  13. Ethical considerations in malaria research proposal review: empirical evidence from 114 proposals submitted to an Ethics Committee in Thailand.

    Science.gov (United States)

    Adams, Pornpimon; Prakobtham, Sukanya; Limphattharacharoen, Chanthima; Vutikes, Pitchapa; Khusmith, Srisin; Pengsaa, Krisana; Wilairatana, Polrat; Kaewkungwal, Jaranit

    2015-09-14

    Malaria research is typically conducted in developing countries in areas of endemic disease. This raises specific ethical issues, including those related to local cultural concepts of health and disease, the educational background of study subjects, and principles of justice at the community and country level. Research Ethics Committees (RECs) are responsible for regulating the ethical conduct of research, but questions have been raised whether RECs facilitate or impede research, and about the quality of REC review itself. This study examines the review process for malaria research proposals submitted to the Ethics Committee of the Faculty of Tropical Medicine at Mahidol University, Thailand. Proposals for all studies submitted for review from January 2010 to December 2014 were included. Individual REC members' reviewing forms were evaluated. Ethical issues (e.g., scientific merit, risk-benefit, sample size, or informed-consent) raised in the forms were counted and analysed according to characteristics, including study classification/design, use of specimens, study site, and study population. All 114 proposals submitted during the study period were analysed, comprising biomedical studies (17 %), drug trials (13 %), laboratory studies (24 %) and epidemiological studies (46 %). They included multi-site (13 %) and international studies (4 %), and those involving minority populations (28 %), children (17 %) and pregnant women (7 %). Drug trials had the highest proportion of questions raised for most ethical issues, while issues concerning privacy and confidentiality tended to be highest for laboratory and epidemiology studies. Clarifications on ethical issues were requested by the ethics committee more for proposals involving new specimen collection. Studies involving stored data and specimens tended to attract more issues around privacy and confidentiality. Proposals involving minority populations were more likely to raise issues than those that did not

  14. Nuclear heating - a review of projects in several countries

    International Nuclear Information System (INIS)

    Vymetal, L.

    1980-01-01

    A review is presented of projects and studies of nuclear heat generation and district heating in the USSR, France, Sweden, Finland, USA, FRG, and CSSR. Attention is primarily paid to the nuclear sources, i.e., nuclear power and heating plants and special reactors for nuclear heating plants. The questions of heat transmission and costs are also dealt with. The review is based on the literature published between 1976 and 1979. An important source were materials from the conference on the use of low-potential heat from nuclear reactors held in Otaniemi (Finland) in 1977. (author)

  15. Critical Success Factors for Malaysian Construction Projects: An Investigative Review

    Directory of Open Access Journals (Sweden)

    Yee Cheong Yong

    2017-05-01

    Full Text Available Construction projects play an important role in the advancement of a nation through infrastructure development that leads to economic growth. They are planned carefully to accomplish certain goals. However, not all the projects achieved the goals as per planned. Many factors contribute to the successes and failures, and it becomes an interesting arena for research. The primary objective of this paper is to outline the development trend of project success measurement globally and locally. The research method employed was to make selected reviews on critical success factors' (CSFs literature and to compare international standards and progress in incorporating human behavioural aspects of project management to the situation in Malaysia. A somewhat similar pattern can be observed in Malaysia where the studies have departed from the usual criteria of time, cost and quality, to define project success in a more holistic way. However, the domestic industry has failed to respond to the emerging trend globally as there has yet been any widely published research on the importance of human-related factors towards project success. A consolidated framework of CSFs has therefore, been proposed in responding to the findings. This paper fulfils an identified need as there has been a dearth of research on the subject matter locally.

  16. Project for review of nuclear energy in the Netherlands

    International Nuclear Information System (INIS)

    Jong, J.J. de

    1988-03-01

    In consequence of the accident national as well as international activities have been undertaken, in particular in the areas of reactor safety and environmental impacts. The international activities were concentrated at IAEA in Vienna, NEA in Paris and the EG. Nationally regarded the accident has induced the project Review and the working plan for rounding-off Chernobylsk. In general it could be noted that one has learned lessons from the accident in the areas of reactor safety and environmental impacts. 22 refs

  17. Report of the US Nuclear Regulatory Commission Piping Review Committee. Volume 2. Evaluation of seismic designs: a review of seismic design requirements for Nuclear Power Plant Piping

    Energy Technology Data Exchange (ETDEWEB)

    1985-04-01

    This document reports the position and recommendations of the NRC Piping Review Committee, Task Group on Seismic Design. The Task Group considered overlapping conservation in the various steps of seismic design, the effects of using two levels of earthquake as a design criterion, and current industry practices. Issues such as damping values, spectra modification, multiple response spectra methods, nozzle and support design, design margins, inelastic piping response, and the use of snubbers are addressed. Effects of current regulatory requirements for piping design are evaluated, and recommendations for immediate licensing action, changes in existing requirements, and research programs are presented. Additional background information and suggestions given by consultants are also presented.

  18. Marketing of radurised food in South Africa: review of a steering committee

    International Nuclear Information System (INIS)

    Basson, J.K.; Basson, R.A.; Brodrick, H.T.; Du Plessis, T.A.

    1993-01-01

    The marketing of radurised food has been developed by a Steering Committee appointed by the Minister of Agriculture in 1981. Membership included representatives from relevant government departments, scientific institutions, organised agriculture, commerce, consumer organisations and the food industry. Its investigations concentrated on the application of the radurisation process to the commercial treatment of food in South Africa and included marketing trials, public perception, safety aspects and possible international trade. Results of a recent status report are presented, which could serve as an example to other countries developing commercial radurisation. (Author)

  19. 75 FR 36698 - Committee Management Renewals

    Science.gov (United States)

    2010-06-28

    .... Committees Committee on Equal Opportunities in Science and Engineering, 1173 Advisory Committee for Computer and Information Science and Engineering, 1115 Advisory Committee for GPRA Performance Assessment..., and Transport Systems, 1189 Proposal Review Panel for Chemistry, 1191 Proposal Review Panel for Civil...

  20. [Review of the methodological, ethical, legal and social issues of research projects in healthcare with big data].

    Science.gov (United States)

    de Lecuona, Itziar

    2018-05-31

    The current model for reviewing research with human beings basically depends on decision-making processes within research ethics committees. These committees must be aware of the importance of the new digital paradigm based on the large-scale exploitation of datasets, including personal data on health. This article offers guidelines, with the application of the EU's General Data Protection Regulation, for the appropriate evaluation of projects that are based on the use of big data analytics in healthcare. The processes for gathering and using this data constitute a niche where current research is developed. In this context, the existing protocols for obtaining informed consent from participants are outdated, as they are based not only on the assumption that personal data are anonymized, but that they will continue to be so in the future. As a result, it is essential that research ethics committees take on new capabilities and revisit values such as privacy and freedom, updating protocols, methodologies and working procedures. This change in the work culture will provide legal security to the personnel involved in research, will make it possible to guarantee the protection of the privacy of the subjects of the data, and will permit orienting the exploitation of data to avoid the commodification of personal data in this era of deidentification, so that research meets actual social needs and not spurious or opportunistic interests disguised as research. Copyright © 2018 SESPAS. Publicado por Elsevier España, S.L.U. All rights reserved.

  1. A New Ethical Challenge for Institutional Review Boards (IRBs/Ethics Committees (ECs in the Assessment of Pediatric Clinical Trials

    Directory of Open Access Journals (Sweden)

    Klaus Rose

    2015-05-01

    Full Text Available Both the US and EU have introduced pediatric pharmaceutical legislation to facilitate clinical trials in children and development of better medicines for children. The first concerns were published in 2014 that the European Medicines Agency (EMA’s Pediatric Committee (PDCO may be over-enthusiastic and has compelled questionable pediatric clinical trials from pharmaceutical companies. Numerous clinical trials are mandated in rare conditions for which not enough patients exist for even one trial. Furthermore, where these trials are mandated in adolescent patients, the legal age limit of the 18th birthday is confused with a medical age limit and can result in separate clinical trials in adolescent patients that neither make medical nor scientific sense nor will ever recruit enough patients for a meaningful outcome. To confirm our concerns we searched the registry clinicaltrials.gov and found examples for PDCO-triggered unethical trials. We conclude that such trials should not be accepted by institutional review boards (IRBs/ethics committees (ECs and that clinical trials resulting from negotiations with EMA’s PDCO need extra careful scrutiny by IRBs/ECs in order to prevent unethical studies and damage to pediatric research and unnecessary risks to pediatric patients.

  2. 78 FR 32698 - Shipping Coordinating Committee; Notice of Committee Meeting

    Science.gov (United States)

    2013-05-31

    ... DEPARTMENT OF STATE [Public Notice 8340] Shipping Coordinating Committee; Notice of Committee... Technical Co-operation Committee --Protection of vital shipping lanes --Periodic review of administrative... of the Organization since the twenty-eighth regular session of the Assembly --External relations...

  3. Auditory hallucinations: A review of the ERC "VOICE" project.

    Science.gov (United States)

    Hugdahl, Kenneth

    2015-06-22

    In this invited review I provide a selective overview of recent research on brain mechanisms and cognitive processes involved in auditory hallucinations. The review is focused on research carried out in the "VOICE" ERC Advanced Grant Project, funded by the European Research Council, but I also review and discuss the literature in general. Auditory hallucinations are suggested to be perceptual phenomena, with a neuronal origin in the speech perception areas in the temporal lobe. The phenomenology of auditory hallucinations is conceptualized along three domains, or dimensions; a perceptual dimension, experienced as someone speaking to the patient; a cognitive dimension, experienced as an inability to inhibit, or ignore the voices, and an emotional dimension, experienced as the "voices" having primarily a negative, or sinister, emotional tone. I will review cognitive, imaging, and neurochemistry data related to these dimensions, primarily the first two. The reviewed data are summarized in a model that sees auditory hallucinations as initiated from temporal lobe neuronal hyper-activation that draws attentional focus inward, and which is not inhibited due to frontal lobe hypo-activation. It is further suggested that this is maintained through abnormal glutamate and possibly gamma-amino-butyric-acid transmitter mediation, which could point towards new pathways for pharmacological treatment. A final section discusses new methods of acquiring quantitative data on the phenomenology and subjective experience of auditory hallucination that goes beyond standard interview questionnaires, by suggesting an iPhone/iPod app.

  4. Report of the expert committee on the review of data on atmospheric fallout arising from British nuclear tests in Australia

    International Nuclear Information System (INIS)

    1984-01-01

    The terms of reference of the committee were to review the published scientific literature and other relevant scientific data on the short and long-term effects of fallout arising from British nuclear tests in Australia; to comment on the adequacy of the data available and the collection methodology; to assess the fallout levels arising from each of the tests, the immediate and subsequent hazards from the fallout to the Australian population and individual Australians, including Australian personnel involved and aborigines in South Australia, and the adequacy of the criteria for safe firing of each of the tests. A comparison is made of radiation protection standards adopted during the nuclear test period with current standards. The recommendations include the setting up of a public inquiry to determine how the conduct and consequences of the British nuclear tests affected the health and well-being of Australians

  5. Sulfosalt systematics: a review. Report of the sulfosalt sub-committee of the IMA Commission on Ore Mineralogy

    DEFF Research Database (Denmark)

    Moelo, Y.; Makovicky, E.; Mozgova, N.N.

    2008-01-01

    , Nomenclature and Classification (CNMNC-IMA). Part I presents generalities of sulfosalt definition and nomenclature. After an extended chemical definition of sulfosalts, attention is focused on "classic" sulfosalts with As3+, Sb3+, Bi3+ or Te4+ as cations, corresponding to the general formula (Me+, Me'(2+), etc......This report deals with a general reexamination of the systematics of sulfosalts. It represents an update of the activity of the Sulfosalt Sub-Committee within the Commission on Ore Mineralogy of the International Mineralogical Association, in connection with the Commission on New Minerals.......), [(Bi, Sb, As)(3+), Te4+](y) [(S, Se, Te)(2-)](z) (Me, Me': various metals). General aspects of their chemistry and classification principles are summarized, especially with regard to chemical substitutions and modular analysis of complex crystal structures. On this basis, Part II presents a review...

  6. End user orientation of TC projects. Special evaluation review

    International Nuclear Information System (INIS)

    1996-12-01

    The present review of the end use orientation of TC projects was undertaken as requested by the TC Department to identify: (a) end users and beneficiaries beyond the boundaries of the counterpart laboratories, as appropriate; (b) means provided or planned to reach the end users and beneficiaries; (c) performance indicators in quantifiable terms, including those related to the counterpart activities that could be foreseen during and after completion of Agency assistance; and (d) recommendations of additional means, if necessary, to reach the end users and beneficiaries. A total of 13 TC projects with large budgets of around $200,000 and above were selected from those first approved under the 1995-1996 biennial programme and supported under the TCF, representing diverse fields of Agency activities and covering all the geographical areas of the Agency's technical co-operation. The projects thus selected were one each from Argentina, Bolivia, Bulgaria, Chile, Colombia, Egypt, Ethiopia, Jordan, Mexico, Mongolia, Slovenia, Turkey and Viet-Nam. The overall budget of the 13 projects as originally approved for 1995 to 1998, amounted to $5,510,980. The current budget as of 8 November 1996 stands at $5,446,719, representing a decrease of more than one percent. Figs, tabs

  7. A desk evaluation review of project BGD/5/010 food irradiation. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-03-26

    To increase the availability of food, the Bangladesh Atomic Energy Commission (BAEC), through its institute of Food and Radiation Biology (IFRB), has for many years pursued research studies in the use of ionizing radiation for food disinfestation and preservation. The Agency has been assisting these research efforts since the late 1970s. Project BGD/5/010, Food Irradiation, as reformulated in 1984, was to take on-going activities ones step further, with the main objective of demonstrating on a semi-commercial scale the efficacy and profitability of food irradiation in reducing the high storage losses of economically important food, such as potatoes, onions, dried fish and other seafood. A further objective was the transfer of food irradiation technology to the relevant industries in Bangladesh. The total budget of the project for the years 1983 through 1992 includes 5.1 man-months of expert services, $1,064,634 for equipment and $29,200 for training. The review was undertaken upon request by the Asia and the Pacific Section, to assess the current status of this ten-year project, which has encountered numerous delays and set-backs and is now nearing completion, and to determine to what extent the experience gained on the project could be useful in the implementation of similar on-going and future projects.

  8. A desk evaluation review of project BGD/5/010 food irradiation. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    To increase the availability of food, the Bangladesh Atomic Energy Commission (BAEC), through its institute of Food and Radiation Biology (IFRB), has for many years pursued research studies in the use of ionizing radiation for food disinfestation and preservation. The Agency has been assisting these research efforts since the late 1970s. Project BGD/5/010, Food Irradiation, as reformulated in 1984, was to take on-going activities ones step further, with the main objective of demonstrating on a semi-commercial scale the efficacy and profitability of food irradiation in reducing the high storage losses of economically important food, such as potatoes, onions, dried fish and other seafood. A further objective was the transfer of food irradiation technology to the relevant industries in Bangladesh. The total budget of the project for the years 1983 through 1992 includes 5.1 man-months of expert services, $1,064,634 for equipment and $29,200 for training. The review was undertaken upon request by the Asia and the Pacific Section, to assess the current status of this ten-year project, which has encountered numerous delays and set-backs and is now nearing completion, and to determine to what extent the experience gained on the project could be useful in the implementation of similar on-going and future projects

  9. Summary of the progress of reactor physics in Japan reviewing the activities related to NEA Committee on Reactor Physics

    International Nuclear Information System (INIS)

    Hirota, Jitsuya

    1984-09-01

    The progress of fast and thermal reactor physics, fusion neutronics and shielding researches in these twenty years can be clearly recognized in the reviews of reactor physics activities in Japan which had been perpared by the Special Committee on Reactor Physics: the joint committee under Atomic Energy Society of Japan and JAERI. Many topics of those discussed at the NEACRP meetings concerned fast reactor physics. Information exchange on the topics such as adjustment of group cross sections by integral data, central worth discrepancy, sodium void effect and heterogeneous core stimulated the researches in Japan. And achievements in Japan including those in the JAERI Fast Critical Facility FCA were reported and contributed largely to the international co-operation. In addition, the contribution from Japan was also made concerning a study of fusion blanket. Among various specialists' meetings recommended by NEACRP, those on nuclear data and benchmarks for reactor shielding were often held since 1973 and helpful to the progress of shielding researches in Japan. The Third Specialists' Meeting on Reactor Noise (SMORN-III) was held in Tokyo in 1981, indicating the recent progress in safety-related applications of reactor noise analysis. The NEACRP benchmark tests were quite useful to the progress of reactor physics in Japan, which included the benchmark calculations of BWR lattice cell, key parameters and burn-up characteristics of a large LMFBR, FBR and PWR shielding, and so on. It may be noted that the benchmark test on reactor noise analysis methods was successfully conducted by Japan in connection with SMORN-III. In addition, the co-operation was positively made to the compilation of light water lattice data, and the preparation of reviews on actinide production and burn-up, and blanket physics. (J.P.N.)

  10. Sex-Divergent Clinical Outcomes and Precision Medicine: An Important New Role for Institutional Review Boards and Research Ethics Committees

    Directory of Open Access Journals (Sweden)

    Ignacio Segarra

    2017-07-01

    Full Text Available The efforts toward individualized medicine have constantly increased in an attempt to improve treatment options. These efforts have led to the development of small molecules which target specific molecular pathways involved in cancer progression. We have reviewed preclinical studies of sunitinib that incorporate sex as a covariate to explore possible sex-based differences in pharmacokinetics and drug–drug interactions (DDI to attempt a relationship with published clinical outputs. We observed that covariate sex is lacking in most clinical outcome reports and suggest a series of ethic-based proposals to improve research activities and identify relevant different sex outcomes. We propose a deeper integration of preclinical, clinical, and translational research addressing statistical and clinical significance jointly; to embed specific sex-divergent endpoints to evaluate possible gender differences objectively during all stages of research; to pay greater attention to sex-divergent outcomes in polypharmacy scenarios, DDI and bioequivalence studies; the clear reporting of preclinical and clinical findings regarding sex-divergent outcomes; as well as to encourage the active role of scientists and the pharmaceutical industry to foster a new scientific culture through their research programs, practice, and participation in editorial boards and Institutional Ethics Review Boards (IRBs and Research Ethics Committees (RECs. We establish the IRB/REC as the centerpiece for the implementation of these proposals. We suggest the expansion of its competence to follow up clinical trials to ensure that sex differences are addressed and recognized; to engage in data monitoring committees to improve clinical research cooperation and ethically address those potential clinical outcome differences between male and female patients to analyze their social and clinical implications in research and healthcare policies.

  11. Genetic screening: programs, principles, and research--thirty years later. Reviewing the recommendations of the Committee for the Study of Inborn Errors of Metabolism (SIEM).

    Science.gov (United States)

    Simopoulos, A P

    2009-01-01

    Screening programs for genetic diseases and characteristics have multiplied in the last 50 years. 'Genetic Screening: Programs, Principles, and Research' is the report of the Committee for the Study of Inborn Errors of Metabolism (SIEM Committee) commissioned by the Division of Medical Sciences of the National Research Council at the National Academy of Sciences in Washington, DC, published in 1975. The report is considered a classic in the field worldwide, therefore it was thought appropriate 30 years later to present the Committee's modus operandi and bring the Committee's recommendations to the attention of those involved in genetics, including organizational, educational, legal, and research aspects of genetic screening. The Committee's report anticipated many of the legal, ethical, economic, social, medical, and policy aspects of genetic screening. The recommendations are current, and future committees should be familiar with them. In 1975 the Committee stated: 'As new screening tests are devised, they should be carefully reviewed. If the experimental rate of discovery of new genetic characteristics means an accelerating rate of appearance of new screening tests, now is the time to develop the medical and social apparatus to accommodate what later on may otherwise turn out to be unmanageable growth.' What a prophetic statement that was. If the Committee's recommendations had been implemented on time, there would be today a federal agency in existence, responsive and responsible to carry out the programs and support research on various aspects of genetic screening, including implementation of a federal law that protects consumers from discrimination by their employers and the insurance industry on the basis of genetic information. Copyright 2008 S. Karger AG, Basel.

  12. [Nuclear energy and environment: review of the IAEA environmental projects].

    Science.gov (United States)

    Fesenko, S; Fogt, G

    2012-01-01

    The review of the environmental projects of the International Atomic Energy Agency is presented. Basic IAEA documents intended to protect humans and the Environment are considered and their main features are discussed. Some challenging issues in the area of protection of the Environment and man, including the impact of nuclear facilities on the environment, radioactive waste management, and remediation of the areas affected by radiological accidents, nuclear testing and sites of nuclear facilities are also discussed. The need to maintain the existing knowledge in radioecology and protection of the environment is emphasised.

  13. 1990 DOE/SANDIA crystalline photovoltaic technology project review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Ruby, D.S. (ed.)

    1990-07-01

    This document serves as the proceedings for the annual project review meeting held by Sandia's Photovoltaic Cell Research Division and Photovoltaic Technology Division. It contains information supplied by each organization making a presentation at the meeting, which was held August 7 through 9, 1990 at the Sheraton Hotel in Albuquerque, New Mexico. Sessions were held to discuss national photovoltaic programs, one-sun crystalline silicon cell research, concentrator silicon cell research, concentrator 3-5 cell research, and concentrating collector development.

  14. 7 CFR 1486.506 - When will a project be reviewed?

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false When will a project be reviewed? 1486.506 Section... Reporting, Evaluation, and Compliance § 1486.506 When will a project be reviewed? Any project or activity... after the completion of the project. ...

  15. Nuclear emergency planning in Spain. The PLABEN review project

    International Nuclear Information System (INIS)

    Lentijo Lentijo, J. C.; Vila Pena, M.

    2002-01-01

    The international rules and recommendations for nuclear emergency planning and the Spanish experience gained in the management of event with radiological risk have noticed that is necessary to review the planning radiological bases for emergencies in nuclear power plants and to define the planning radiological bases for radiological emergencies that could happen in radioactive facilities or in activities out of the regulatory framework. The paper focuses on CSN actions concerning the Plaben review project related to define the new radiological principles taking into account the current international recommendations for interventions, make a proposal about the organisation and operation of the provincial radiological action group and the national support level for radiological emergency response. (Author) 7 refs

  16. U.S. National Committee for Rock Mechanics; and Conceptual model of fluid infiltration in fractured media. Project summary, July 28, 1997--July 27, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    The title describes the two tasks summarized in this report. The remainder of the report contains information on meetings held or to be held on the subjects. The US National Committee for Rock Mechanics (USNC/RM) provides for US participation in international activities in rock mechanics, principally through adherence to the International Society for Rock Mechanics (ISRM). It also keeps the US rock mechanics community informed about new programs directed toward major areas of national concern in which rock mechanics problems represent critical or limiting factors, such as energy resources, excavation, underground storage and waste disposal, and reactor siting. The committee also guides or produces advisory studies and reports on problem areas in rock mechanics. A new panel under the auspices of the US National Committee for Rock Mechanics has been appointed to conduct a study on Conceptual Models of Fluid Infiltration in Fractured Media. The study has health and environmental applications related to the underground flow of pollutants through fractured rock in and around mines and waste repositories. Support of the study has been received from the US Nuclear Regulatory Commission and the Department of Energy`s Yucca Mountain Project Office. The new study builds on the success of a recent USNC/RM report entitled Rock Fractures and Fluid Flow: Contemporary Understanding and Applications (National Academy Press, 1996, 551 pp.). A summary of the new study is provided.

  17. U.S. National Committee for Rock Mechanics and conceptual model of fluid infiltration in fractured media. Project summary, July 28, 1997 - July 27, 1998

    International Nuclear Information System (INIS)

    1998-01-01

    The title describes the two tasks summarized in this report. The remainder of the report contains information on meetings held or to be held on the subjects. The US National Committee for Rock Mechanics (USNC/RM) provides for US participation in international activities in rock mechanics, principally through adherence to the International Society for Rock Mechanics (ISRM). It also keeps the US rock mechanics community informed about new programs directed toward major areas of national concern in which rock mechanics problems represent critical or limiting factors, such as energy resources, excavation, underground storage and waste disposal, and reactor siting. The committee also guides or produces advisory studies and reports on problem areas in rock mechanics. A new panel under the auspices of the US National Committee for Rock Mechanics has been appointed to conduct a study on Conceptual Models of Fluid Infiltration in Fractured Media. The study has health and environmental applications related to the underground flow of pollutants through fractured rock in and around mines and waste repositories. Support of the study has been received from the US Nuclear Regulatory Commission and the Department of Energy's Yucca Mountain Project Office. The new study builds on the success of a recent USNC/RM report entitled Rock Fractures and Fluid Flow: Contemporary Understanding and Applications (National Academy Press, 1996, 551 pp.). A summary of the new study is provided

  18. Ensuring Resident Competence: A Narrative Review of the Literature on Group Decision Making to Inform the Work of Clinical Competency Committees.

    Science.gov (United States)

    Hauer, Karen E; Cate, Olle Ten; Boscardin, Christy K; Iobst, William; Holmboe, Eric S; Chesluk, Benjamin; Baron, Robert B; O'Sullivan, Patricia S

    2016-05-01

    Background The expectation for graduate medical education programs to ensure that trainees are progressing toward competence for unsupervised practice prompted requirements for a committee to make decisions regarding residents' progress, termed a clinical competency committee (CCC). The literature on the composition of these committees and how they share information and render decisions can inform the work of CCCs by highlighting vulnerabilities and best practices. Objective We conducted a narrative review of the literature on group decision making that can help characterize the work of CCCs, including how they are populated and how they use information. Methods English language studies of group decision making in medical education, psychology, and organizational behavior were used. Results The results highlighted 2 major themes. Group member composition showcased the value placed on the complementarity of members' experience and lessons they had learned about performance review through their teaching and committee work. Group processes revealed strengths and limitations in groups' understanding of their work, leader role, and information-sharing procedures. Time pressure was a threat to the quality of group work. Conclusions Implications of the findings include the risks for committees that arise with homogeneous membership, limitations to available resident performance information, and processes that arise through experience rather than deriving from a well-articulated purpose of their work. Recommendations are presented to maximize the effectiveness of CCC processes, including their membership and access to, and interpretation of, information to yield evidence-based, well-reasoned judgments.

  19. Scientific and technical advisory committee review of the nutrient inputs to the watershed model

    Science.gov (United States)

    The following is a report by a STAC Review Team concerning the methods and documentation used by the Chesapeake Bay Partnership for evaluation of nutrient inputs to Phase 6 of the Chesapeake Bay Watershed Model. The “STAC Review of the Nutrient Inputs to the Watershed Model” (previously referred to...

  20. 77 FR 53228 - Native American Graves Protection and Repatriation Review Committee: Meeting

    Science.gov (United States)

    2012-08-31

    ... and findings of fact related to the identity or cultural affiliation of human remains or other...)(3), for review and findings of fact related to the identity or cultural affiliation of human remains...), for review and findings of fact related to the identity or cultural affiliation of human remains or...

  1. Design iteration in construction projectsReview and directions

    Directory of Open Access Journals (Sweden)

    Purva Mujumdar

    2018-03-01

    Full Text Available Design phase of any construction project involves several designers who exchange information with each other most often in an unstructured manner throughout the design phase. When these information exchanges happen to occur in cycles/loops, it is termed as design iteration. Iteration is an inherent and unavoidable aspect of any design phase which requires proper planning. Till date, very few researchers have explored the design iteration (“complexity” in construction sector. Hence, the objective of this paper was to document and review the complexities of iteration during design phase of construction projects for efficient design planning. To achieve this objective, exhaustive literature review on design iteration was done for four sectors – construction, manufacturing, aerospace, and software development. In addition, semi-structured interviews and discussions were done with a few design experts to verify the different dimensions of iteration. Finally, a design iteration framework was presented in this study that facilitates successful planning. Keywords: Design iteration, Types of iteration, Causes and impact of iteration, Models of iteration, Execution strategies of iteration

  2. Decommissioning project readiness reviews at the Department of Energy's Hanford, Washington, Site

    International Nuclear Information System (INIS)

    Speer, D.R.; Holmes, P.A.

    1987-01-01

    Two Hanford Site contractors independently formulated readiness review methods to prepare for decontamination and decommissioning (D and D) projects. One readiness review method provided an independent management review process. The other method provided a review by personnel directly involved in the project and concise documentation procedures. A unified system is now used at Hanford which combines the best aspects of both readiness review methods. The unified method assigns category levels based on certain job characteristics. The category assigned to the project then indicates the required level of management review prior to proceeding with the D and D project. In addition, the concise documentation procedures are now used for all category levels

  3. Report of the US Nuclear Regulatory Commission Piping Review Committee. Volume 3. Evaluation of potential for pipe breaks

    Energy Technology Data Exchange (ETDEWEB)

    1984-11-01

    The Executive Director for Operations (EDO) in establishing the Piping Review Committee concurred in its overall scope that included an evaluation of the potential for pipe breaks. The Pipe Break Task Group has responded to this directive. This report summarizes a review of regulatory documents and contains the Task Group's recommendations for application of the leak-before-break (LBB) approach to the NRC licensing process. The LBB approach means the application of fracture mechanics technology to demonstrate that high energy fluid piping is very unlikely to experience double-ended ruptures or their equivalent as longitudinal or diagonal splits. The Task Group's reommendations and discussion are founded on current and ongoing NRC staff actions as presented in Section 3.0 of this report. Additional more detailed comments and discussion are presented in Section 5.0 and in Appendices A and B. The obvious issues are the reexamination of the large pipe break criteria and the implications of any changes in the criteria as they influence items such as jet loads and pipe whip. The issues have been considered and the Task Group makes the following recommendations.

  4. Report of the US Nuclear Regulatory Commission Piping Review Committee. Volume 3. Evaluation of potential for pipe breaks

    International Nuclear Information System (INIS)

    1984-11-01

    The Executive Director for Operations (EDO) in establishing the Piping Review Committee concurred in its overall scope that included an evaluation of the potential for pipe breaks. The Pipe Break Task Group has responded to this directive. This report summarizes a review of regulatory documents and contains the Task Group's recommendations for application of the leak-before-break (LBB) approach to the NRC licensing process. The LBB approach means the application of fracture mechanics technology to demonstrate that high energy fluid piping is very unlikely to experience double-ended ruptures or their equivalent as longitudinal or diagonal splits. The Task Group's reommendations and discussion are founded on current and ongoing NRC staff actions as presented in Section 3.0 of this report. Additional more detailed comments and discussion are presented in Section 5.0 and in Appendices A and B. The obvious issues are the reexamination of the large pipe break criteria and the implications of any changes in the criteria as they influence items such as jet loads and pipe whip. The issues have been considered and the Task Group makes the following recommendations

  5. CSNI collective statement on support facilities for existing and advanced reactors. The function of OECD/Nea joint projects Nea committee on the safety of nuclear installations (CSNI)

    International Nuclear Information System (INIS)

    2008-01-01

    The NEA Committee on the Safety of Nuclear Installations (CSNI) has recently completed a study on the availability and utilisation of facilities supporting safety studies for current and advanced nuclear power reactors. The study showed that significant steps had been undertaken in the past several years in support of safety test facilities, mainly by conducting multinational joint projects centered on the capability of unique test facilities worldwide. Given the positive experience of the safety research projects, it has been recommended that efforts be made to prioritize technical issues associated with advanced (Generation IV) reactor designs and to develop options on how to efficiently obtain the necessary data through internationally co-ordinated research, preparing a gradual extension of safety research beyond the needs set by currently operating reactors. This statement constitutes a reference for future CSNI activities and for safety authorities, R and D centres and industry for internationally co-ordinated research initiatives in the nuclear safety research area. (author)

  6. Review of the Local Organizing Committee (LOC) medical services during the 12th FINA World Swimming Championships (25 m) in Doha, Qatar.

    Science.gov (United States)

    Dijkstra, H Paul; Geertsema, Liesel; Benzarti, Nejib; van Dorssen, Elsbeth A L; van den Hoogenband, Cees-Rein; Mountjoy, Margo

    2016-05-01

    One of the primary roles of Fédération Internationale de Natation (FINA) is to promote athlete health. The planning and delivery of major international event medical services is carried out in collaboration with the Local Organizing Committee Medical Commission (LOCMC). Aspetar Orthopaedic and Sports Medicine Hospital provided the medical services to the 12th FINA World Swimming Championships (25 m) creating a unique opportunity for collaboration with FINA. The purpose of this paper is to review the planning and delivery of medical services and athlete health promotion projects during the 12th FINA World Swimming Championships (25 m) to facilitate the planning of future sporting events of this size and scope. The 12th FINA World Swimming Championships (25 m) hosted 974 athletes from 166 countries. The LOC medical team recorded all medical encounters-newly incurred (or acute exacerbations of chronic) injuries and illnesses as well as follow-up consultations. More than 90% of teams did not travel with a team physician and relied on the LOCMC for diagnosis and treatment of injuries and illnesses in athletes and accredited team officials. The LOC medical team had a total of 554 medical encounters: 385 therapy, 34 athlete injury, 65 athlete illness and 70 non-athlete encounters. The LOCMC in collaboration with FINA delivered comprehensive medical services to athletes, officials and spectators attending the 12th FINA World Swimming Championships (25 m). This review paper provides information relevant to the planning and delivery of LOCMC medical services for future international swimming events contributing to the FINA objective of promoting athlete health. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  7. Review of the secret committees deal with old beliver’s schism in the reign of the Emperor Alexander I

    Directory of Open Access Journals (Sweden)

    Serebrjakova Julija

    2012-06-01

    Full Text Available The article discusses a history of secret committees deal with measures against old believer’s schism. The author studied archival documents possible to consider confessional politics of the Emperor Alexander I as a new stage of struggle with the old believer’s schism. The first secret committee was established by order of Emperor Alexander I in 1820. This committee was a unique phenomenon in the history of the secret committees of the 19th century and the first experience ofjoint efforts of Church and State against.

  8. 76 FR 12132 - Native American Graves Protection and Repatriation Review Committee: Meeting

    Science.gov (United States)

    2011-03-04

    ... fact related to the identity or cultural affiliation of human remains or other cultural items, or the...), for review and findings of fact related to the identity or cultural affiliation of human remains or... consensus clearly has not been reached among affected parties regarding the identity or cultural affiliation...

  9. 75 FR 70028 - Native American Graves Protection and Repatriation Review Committee: Meeting 2253-665

    Science.gov (United States)

    2010-11-16

    ..., pursuant to 25 U.S.C. 3006 (c)(3), for review and findings of fact related to the identity or cultural... identity or cultural affiliation of human remains or other cultural items, or the return of such items... reached among affected parties regarding the identity or cultural affiliation of human remains or other...

  10. 11 CFR 116.7 - Debt settlement plans filed by terminating committees; Commission review.

    Science.gov (United States)

    2010-01-01

    ... description of the terms under which the creditor has extended credit to nonpolitical debtors of similar risk... settlement plan after the creditors included in the debt settlement plan have agreed to the settlement or... payments to the creditors included in the debt settlement plan until completion of Commission review. The...

  11. AGU Committees

    Science.gov (United States)

    Administrative Committees are responsible for those functions required for the overall performance or well-being of AGU as an organization. These committees are Audit and Legal Affairs, Budget and Finance*, Development, Nominations*, Planning, Statutes and Bylaws*, Tellers.Operating Committees are responsible for the policy direction and operational oversight of AGU's primary programs. The Operating Committees are Education and Human Resources, Fellows*, Information Technology, International Participation*, Meetings, Public Affairs, Public Information, Publications*.

  12. HHARP: The Historical Hospital Admission Records Project – a review

    Directory of Open Access Journals (Sweden)

    Cara Hirst

    2018-04-01

    Full Text Available Hospital records have frequently been used in epidemiological research (Kilgore et al. 2017; Rushton 2016, and in some cases palaeopathological research. However, the availability of data is problematic, with written records requiring considerable time to interpret, digitise and analyse. In 2001, the Historical Hospital Records Project (HHARP began digitising over 140,000 hospital admission records from four hospitals in London and Glasgow, providing researchers with an online data base of hospital records (Figure 1. I review the data available in the HHARP database, as well as make a preliminary analysis of the hospital records from London and Glasgow between c.1852-1921 which illustrates the value of the HHARP database in understanding disease and medical care during this period.

  13. Using fuzzy logic to improve the project time and cost estimation based on Project Evaluation and Review Technique (PERT

    Directory of Open Access Journals (Sweden)

    Farhad Habibi

    2018-09-01

    Full Text Available Among different factors, correct scheduling is one of the vital elements for project management success. There are several ways to schedule projects including the Critical Path Method (CPM and Program Evaluation and Review Technique (PERT. Due to problems in estimating dura-tions of activities, these methods cannot accurately and completely model actual projects. The use of fuzzy theory is a basic way to improve scheduling and deal with such problems. Fuzzy theory approximates project scheduling models to reality by taking into account uncertainties in decision parameters and expert experience and mental models. This paper provides a step-by-step approach for accurate estimation of time and cost of projects using the Project Evaluation and Review Technique (PERT and expert views as fuzzy numbers. The proposed method included several steps. In the first step, the necessary information for project time and cost is estimated using the Critical Path Method (CPM and the Project Evaluation and Review Technique (PERT. The second step considers the duration and cost of the project activities as the trapezoidal fuzzy numbers, and then, the time and cost of the project are recalculated. The duration and cost of activities are estimated using the questionnaires as well as weighing the expert opinions, averaging and defuzzification based on a step-by-step algorithm. The calculating procedures for evaluating these methods are applied in a real project; and the obtained results are explained.

  14. TWTF project criticality task force final review and assessment

    International Nuclear Information System (INIS)

    McKinley, K.B.; Cannon, J.W.; Wheeler, F.J.; Worle, H.A.

    1980-11-01

    The Transuranic Waste Treatment Facility (TWTF) is being developed to process transuranic waste, stored and buried at the Idaho National Engineering Laboratory, into a chemically inert, physically stable basalt-like residue acceptable at a federal repository. A task force was assembled by the TWTF Project Division to review and assess all aspects of criticality safety for the TWTF. This document presents the final review, assessments, and recommendations of this task force. The following conclusions were made: Additional criticality studies are needed for the entire envelope of feed compositions and temperature effects. Safe operating k/sub eff/'s need to be determined for process components. Criticality analyses validation experiments may also be required. SRP neutron interrogation should be replaced by DDT neutron interrogation. Accuracy studies need to be performed for the proposed assaying techniques. Time-correlated neutron monitoring needs to be mocked up for process components to prove feasibility and determine accuracy. The criticality control techniques developed for the TWTF conceptual design are in compliance with ERDAM 0530, including the Double Contingency Rule. Detailed procedures and controls need to be developed

  15. Review of PV Inverter Technology Cost and Performance Projections

    Energy Technology Data Exchange (ETDEWEB)

    Navigant Consulting Inc.

    2006-01-01

    The National Renewable Energy Laboratory (NREL) has a major responsibility in the implementation of the U.S. Department of Energy's (DOE's) Solar Energy Technologies Program. Sandia National Laboratories (SNL) has a major role in supporting inverter development, characterization, standards, certifications, and verifications. The Solar Energy Technologies Program recently published a Multiyear Technical Plan, which establishes a goal of reducing the Levelized Energy Cost (LEC) for photovoltaic (PV) systems to $0.06/kWh by 2020. The Multiyear Technical Plan estimates that, in order to meet the PV system goal, PV inverter prices will need to decline to $0.25-0.30 Wp by 2020. DOE determined the need to conduct a rigorous review of the PV Program's technical and economic targets, including the target set for PV inverters. NREL requested that Navigant Consulting Inc.(NCI) conduct a review of historical and projected cost and performance improvements for PV inverters, including identification of critical barriers identified and the approaches government might use to address them.

  16. Dose reconstruction for the Urals population. Joint Coordinating Committee on Radiation Effects Research, Project 1.1 -- Final report

    International Nuclear Information System (INIS)

    Degteva, M.O.; Drozhko, E.; Anspaugh, L.R.; Napier, B.A.; Bouville, A.C.; Miller, C.W.

    1996-02-01

    This work is being carried out as a feasibility study to determine if a long-term course of work can be implemented to assess the long-term risks of radiation exposure delivered at low to moderate dose rates to the populations living in the vicinity of the Mayak Industrial Association (MIA). This work was authorized and conducted under the auspices of the US-Russian Joint Coordinating Committee on Radiation Effects Research (JCCRER) and its Executive Committee (EC). The MIA was the first Russian site for the production and separation of plutonium. This plant began operation in 1948, and during its early days there were technological failures that resulted in the release of large amounts of waste into the rather small Techa River. There were also gaseous releases of radioiodines and other radionuclides during the early days of operation. In addition, there was an accidental explosion in a waste storage tank in 1957 that resulted in a significant release. The Techa River Cohort has been studied for several years by scientists from the Urals Research Centre for Radiation Medicine and an increase in both leukemia and solid tumors has been noted

  17. Dose reconstruction for the Urals population. Joint Coordinating Committee on Radiation Effects Research, Project 1.1 -- Final report

    Energy Technology Data Exchange (ETDEWEB)

    Degteva, M.O. [Urals Research Center for Radiation Medicine, Chelyabinsk (Russian Federation); Drozhko, E. [Branch 1 of Moscow Biophysics Inst., Ozersk (Russian Federation); Anspaugh, L.R. [Lawrence Livermore National Lab., CA (United States); Napier, B.A. [Pacific Northwest National Lab., Richland, WA (United States); Bouville, A.C. [National Cancer Inst., Bethesda, MD (United States); Miller, C.W. [Centers for Disease Control and Prevention, Atlanta, GA (United States)

    1996-02-01

    This work is being carried out as a feasibility study to determine if a long-term course of work can be implemented to assess the long-term risks of radiation exposure delivered at low to moderate dose rates to the populations living in the vicinity of the Mayak Industrial Association (MIA). This work was authorized and conducted under the auspices of the US-Russian Joint Coordinating Committee on Radiation Effects Research (JCCRER) and its Executive Committee (EC). The MIA was the first Russian site for the production and separation of plutonium. This plant began operation in 1948, and during its early days there were technological failures that resulted in the release of large amounts of waste into the rather small Techa River. There were also gaseous releases of radioiodines and other radionuclides during the early days of operation. In addition, there was an accidental explosion in a waste storage tank in 1957 that resulted in a significant release. The Techa River Cohort has been studied for several years by scientists from the Urals Research Centre for Radiation Medicine and an increase in both leukemia and solid tumors has been noted.

  18. Computational physics and applied mathematics capability review June 8-10, 2010 (Advance materials to committee members)

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Stephen R [Los Alamos National Laboratory

    2010-01-01

    differential equations (broadly defined) in a variety of settings, including particle transport, solvers, and plasma physics; (3) Monte Carlo - Monte Carlo was invented at Los Alamos, and this theme discusses these vitally important methods and their application in everything from particle transport, to condensed matter theory, to biology; (4) Molecular Dynamics - This theme describes the widespread use of molecular dynamics for a variety of important applications, including nuclear energy, materials science, and biological modeling; (5) Discrete Event Simulation - The technical scope of this theme represents a class of complex system evolutions governed by the action of discrete events. Examples include network, communication, vehicle traffic, and epidemiology modeling; and (6) Integrated Codes - This theme discusses integrated applications (comprised of all of the supporting science represented in Themes 1-5) that are of strategic importance to the Laboratory and the nation. The laboratory has in approximately 10 million source lines of code in over 100 different such strategically important applications. Of these themes, four of them will be reviewed during the 2010 review cycle: Themes 1, 2, 3, and 6. Because these capability reviews occur every three years, Themes 4 and 5 will be reviewed in 2013, along with Theme 6 (which will be reviewed during each review, owing to this theme's role as an integrator of the supporting science represented by the other 5 themes). Yearly written status reports will be provided to the Capability Review Committee Chair during off-cycle years.

  19. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack

    1984-11-01

    This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.

  20. Constitutional limits on federal legislation practically compelling medical employment: Wong v Commonwealth; Selim v Professional Services Review Committee.

    Science.gov (United States)

    Faunce, Thomas

    2009-10-01

    A recent decision by the High Court of Australia (Wong v Commonwealth; Selim v Professional Services Review Committee (2009) 236 CLR 573) (the PSR case) has not only clarified the scope of the Australian constitutional prohibition on "any form of civil conscription" in relation to federal legislation concerning medical or dental services (s 51xxiiiA), but has highlighted its importance as a great constitutional guarantee ensuring the mixed State-federal and public-private nature of medical service delivery in Australia. Previous decisions of the High Court have clarified that the prohibition does not prevent federal laws regulating the manner in which medical services are provided. The PSR case determined that the anti-overservicing provisions directed at bulk-billing general practitioners under Pt VAA of the Health Insurance Act 1973 (Cth) did not offend the prohibition. Importantly, the High Court also indicated that the s 51(xxiiiA) civil conscription guarantee should be construed widely and that it would invalidate federal laws requiring providers of medical and dental services (either expressly or by practical compulsion) to work for the federal government or any specified State, agency or private industrial employer. This decision is likely to restrict the capacity of any future federal government to restructure the Australian health care system, eg by implementing recommendations from the National Health and Hospitals Reform Commission for either federal government or private corporate control of presently State-run public hospitals.

  1. Review of laboratory programs for women Points-of-Contact Committee

    Energy Technology Data Exchange (ETDEWEB)

    Duke, D.; Magrini, K. [comps.] [National Renewable Energy Lab., Golden, CO (United States); McLane, V. [comp.] [Brookhaven National Lab., Upton, NY (United States); Wieda, K. [comp.] [Pacific Northwest Lab., Richland, WA (United States)

    1995-06-01

    The mission of the DOE Review of Laboratory Programs for Women is to: provide DOE and its Laboratories with effective strategies, targeting women, for establishing aggressive outreach programs which improve the access of women to careers in science, engineering, and mathematics. Ensure that the Department and its Laboratories are exemplary places of employment by providing programs which enhance opportunity, remove barriers, and assist women in achieving full professional development. A survey of the DOE facilities was undertaken by the Points-of-Contact for the DOE Review of Laboratory Programs for Women in order to gather data to be used as a baseline against which to measure future progress. We plan to look at current programs already in place and evaluate them with a view to deciding which programs are most effective, and selecting model programs suitable for implementation at other facilities. The survey focused on four areas: statistical data, laboratory policy, formal and informal programs which affect the quality of life in the work environment, and career development and advancement, and educational programs. Although this report focuses on women, the problems discussed affect all DOE facility employees.

  2. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project FY17 Annual Review

    Science.gov (United States)

    Sakahara, Robert; Hackenberg, Davis; Johnson, William

    2017-01-01

    This presentation was presented to the Integrated Aviation Systems Program at the FY17 Annual Review of the UAS-NAS project. The presentation captures the overview of the work completed by the UAS-NAS project and its subprojects.

  3. Software development project success and failure from the supplier's perspective: A systematic literature review

    OpenAIRE

    Savolainen, Paula; Ahonen, Jarmo J.; Richardson, Ita

    2012-01-01

    peer-reviewed In this paper, we consider software development project success and failure from the supplier's perspective. First we clarified concepts in order to be able to exclude review articles on in-house projects, continuous services, the customer's perspective, and software product development, with the aim of providing valid results for supplier firms. We divided success criteria into project success and project management (PM) success, and, in seven articles, identified thre...

  4. The energy Review: the revision of british the energy policy and the radioactive wastes: the report of Committee on Radioactive Waste Management

    International Nuclear Information System (INIS)

    Daoudi, M.

    2006-07-01

    This report presents the british energy policy, in which the nuclear power has a real part. The report details: the reduction of the carbon emission by the energy conservation and the clean energies, the energy safety, the impacts of the Energy Review, the technology part to reach these objectives and some reactions. The second part is devoted to the radioactive wastes and a presentation of the report Committee on Radioactive Wastes. (A.L.B.)

  5. Clinical research ethics review process in Lebanon: efficiency and functions of research ethics committees – results from a descriptive questionnaire-based study

    OpenAIRE

    Atallah, David; Moubarak, Malak; El Kassis, Nadine; Abboud, Sara

    2018-01-01

    Background Clinical trials conducted in Lebanon are increasing. However, little is known about the performance of research ethics committees (RECs) in charge of reviewing the research protocols. This study aimed to assess the level of adherence to the ethics surrounding the conduct of clinical trials and perceptions of team members regarding roles of the RECs during the conduct of clinical trials in Lebanon. The research question was: Are RECs adherent to the ethics surrounding the conduct of...

  6. Fuel transfer system ALARA design review - Project A.15

    International Nuclear Information System (INIS)

    KUEBERTH, L.R.

    2001-01-01

    One mission of the Spent Nuclear Fuel (SNF) Project is to move the SNF from the K Basins in the Hanford 100K Area to an interim dry storage at the Canister Storage Building (CSB) in the Hanford 200 East Area. The Fuel Transfer System (FTS) is a subproject that will move the SNF from the 105K East (KE) Facility to the 105K West (KW) Facility. The SNF will be treated for shipment to the Cold Vacuum Drying (CVD) facility at the KW Basin. The SNF canisters will be loaded underwater into a Shielded Transfer Cask (STC) in the KE Basin. The fully loaded STC will be brought out of the water and placed into a Cask Transfer Overpack (CTO) by the STC Straddle Carrier. As the STC is removed from the water, it will be washed down with demineralized water by an manual rinse system. The CTO with the STC inside will be placed on a transport trailer and transferred to the KW Basin as an intra-facility transfer. The CTO will be unloaded from the shipping trailer at the KW Basin and the STC will be removed from the CTO. The STC will then be lowered into the KW Basin water and the fuel will be removed. The SNF will then be processed for shipment to the CVD. As soon as all of the fuel has been removed from the STC, the cask will be removed from the KW Basin water and placed into the CTO. The CTO will again be placed on the trailer for transport back to the KE Basin where the entire cycle will be repeated approximately 400 times. This document records the As Low As Reasonably Achievable (ALARA) findings and design recommendations/requirements by the SNF Project noted during the Final Design Review of the STC, CTO, STC Transfer System, Annexes and Roadways for support of FTS. This document is structured so that all statements that include the word ''shall'' represent design features that have been or will be implemented within the project scope. Statements that include the words ''should'' or ''recommend'' represent ALARA design features to be evaluated for future implementation

  7. 76 FR 37380 - Committee Management Renewals

    Science.gov (United States)

    2011-06-27

    ... Advisory Committee for Biological Sciences, 1110 Advisory Committee for Education and Human Resources, 1119...) management officials having responsibility for the advisory committees listed below have determined that... Review Panel for Social Behavioral and Economic Sciences, 1766 Proposal Review Panel for Biological...

  8. 78 FR 38736 - Committee Management; Renewals

    Science.gov (United States)

    2013-06-27

    ... Cyberinfrastructure, 25150 Advisory Committee for Education and Human Resources, 1119 Advisory Committee for...) management officials having responsibility for the advisory committees listed below have determined that... Settings, 59 Proposal Review Panel for Social, Behavioral and Economic Sciences, 1766 Proposal Review Panel...

  9. Learning from open source software projects to improve scientific review.

    Science.gov (United States)

    Ghosh, Satrajit S; Klein, Arno; Avants, Brian; Millman, K Jarrod

    2012-01-01

    Peer-reviewed publications are the primary mechanism for sharing scientific results. The current peer-review process is, however, fraught with many problems that undermine the pace, validity, and credibility of science. We highlight five salient problems: (1) reviewers are expected to have comprehensive expertise; (2) reviewers do not have sufficient access to methods and materials to evaluate a study; (3) reviewers are neither identified nor acknowledged; (4) there is no measure of the quality of a review; and (5) reviews take a lot of time, and once submitted cannot evolve. We propose that these problems can be resolved by making the following changes to the review process. Distributing reviews to many reviewers would allow each reviewer to focus on portions of the article that reflect the reviewer's specialty or area of interest and place less of a burden on any one reviewer. Providing reviewers materials and methods to perform comprehensive evaluation would facilitate transparency, greater scrutiny, and replication of results. Acknowledging reviewers makes it possible to quantitatively assess reviewer contributions, which could be used to establish the impact of the reviewer in the scientific community. Quantifying review quality could help establish the importance of individual reviews and reviewers as well as the submitted article. Finally, we recommend expediting post-publication reviews and allowing for the dialog to continue and flourish in a dynamic and interactive manner. We argue that these solutions can be implemented by adapting existing features from open-source software management and social networking technologies. We propose a model of an open, interactive review system that quantifies the significance of articles, the quality of reviews, and the reputation of reviewers.

  10. Learning from open source software projects to improve scientific review

    Directory of Open Access Journals (Sweden)

    Satrajit S Ghosh

    2012-04-01

    Full Text Available Peer-reviewed publications are the primary mechanism for sharing scientific results. The current peer-review process is, however, fraught with many problems that undermine the pace, validity, and credibility of science. We highlight five salient problems: (1 Reviewers are expected to have comprehensive expertise; (2 Reviewers do not have sufficient access to methods and materials to evaluate a study; (3 Reviewers are not acknowledged; (4 There is no measure of the quality of a review; and (5 Reviews take a lot of time, and once submitted cannot evolve. We propose that these problems can be resolved by making the following changes to the review process. Distributing reviews to many reviewers would allow each reviewer to focus on portions of the article that reflect the reviewer’s specialty or area of interest and place less of a burden on any one reviewer, enabling a more comprehensive and timely review. Providing reviewers materials and methods to perform comprehensive evaluation would facilitate transparency, replication of results and enable greater scrutiny by people from different fields using different nomenclature, leading to greater clarity and cross-fertilization of ideas. Acknowledging reviewers makes it possible to quantitatively assess reviewer contributions, which could be integrated with assessments for promotions and grants. Quantifying review quality could help establish the importance of reviewers and information generated during a review, and assess the importance of a submitted article. Finally, we recommend expediting post-publication reviews and allowing for the dialogue to continue and flourish in a dynamic and interactive manner. We argue that these solutions can be addressed by building upon computer programming code management systems. In this article, we provide examples of current code review systems that offer opportunities for addressing the above problems, and offer suggestions for enhancing code review systems for

  11. Design review plan for Multi-Function Waste Tank Facility (Project W-236A)

    International Nuclear Information System (INIS)

    Renfro, G.G.

    1994-01-01

    This plan describes how the Multi-Function Waste Tank Facility (MWTF) Project conducts reviews of design media; describes actions required by Project participants; and provides the methodology to ensure that the design is complete, meets the technical baseline of the Project, is operable and maintainable, and is constructable. Project W-236A is an integrated project wherein the relationship between the operating contractor and architect-engineer is somewhat different than that of a conventional project. Working together, Westinghouse Hanford Company (WHC) and ICF Karser Hanford (ICF KH) have developed a relationship whereby ICF KH performs extensive design reviews and design verification. WHC actively participates in over-the-shoulder reviews during design development, performs a final review of the completed design, and conducts a formal design review of the Safety Class I, ASME boiler and Pressure Vessel Code items in accordance with WHC-CM-6-1, Standard Engineering Practices

  12. 75 FR 9616 - Committee Management Renewals

    Science.gov (United States)

    2010-03-03

    ... NATIONAL SCIENCE FOUNDATION Committee Management Renewals The NSF management officials having... follows consultation with the Committee Management Secretariat, General Services Administration... Industrial Innovations and Partnerships, 28164. Proposal Review Panel for Emerging Frontiers in Research and...

  13. 77 FR 12086 - Committee Management Renewals

    Science.gov (United States)

    2012-02-28

    ... NATIONAL SCIENCE FOUNDATION Committee Management Renewals The NSF management officials having... follows consultation with the Committee Management Secretariat, General Services Administration... Industrial Innovations and Partnerships, 28164 Proposal Review Panel for Emerging Frontiers in Research and...

  14. A Global Review of Sustainable Construction Project Financing: Policies, Practices, and Research Efforts

    Directory of Open Access Journals (Sweden)

    Ming Shan

    2017-12-01

    Full Text Available Despite the increasing investment in sustainable development over the past decade, a systematic review of sustainable construction project financing is lacking. The objectives of this paper are to conduct a systematic review to examine the policies, practices, and research efforts in the area of sustainable construction project financing, and to explore the potential opportunities for the future research. To achieve these goals, this paper first reviewed the sustainable construction project financing practices implemented by four representative developed economies including the United Kingdom, the United States, Singapore, and Australia. Then, this paper reviewed the efforts and initiatives launched by three international organizations including the United Nations, the Organization for Economic Co-operation and Development, and International Finance Corporation. After that, this paper reviewed the research efforts of sustainable construction project financing published in peer-review journals and books. This paper identified four major research themes within this area, which are the review of financial stakeholders and market of sustainable construction, benefits and barriers to sustainable construction project financing, financial vehicles for sustainable construction projects, innovative models and mechanisms for sustainable construction project financing. Additionally, this paper revealed five directions for the future research of sustainable construction project financing, which are the identification of financial issues in sustainable construction projects, the investigation of financial vehicles for sustainable construction projects in terms of their strengths, limitations, and performances, the examination of critical drivers for implementing sustainable construction project financing, the development of a knowledge-based decision support system for implementing sustainable construction financing, and the development of best practices for

  15. 78 FR 18348 - Submission for OMB Review; Use of Project Labor Agreements for Federal Construction Projects

    Science.gov (United States)

    2013-03-26

    ...: There is no existing Governmentwide data base that collects PLAs and specifically the number submitted... Project Labor Agreements for Federal Construction Projects AGENCY: Department of Defense (DOD), General... information collection requirement regarding Use of Project Labor Agreements for Federal Construction Projects...

  16. SAM Technical Review Committee Final Report: Summary and Key Recommendations from the Onsite TRC Meeting Held April 22-23, 2013

    Energy Technology Data Exchange (ETDEWEB)

    Blair, N.; Dobos, S.; Janzou, S.; Gilman, P.; Freeman, J.; Kaffine, L.

    2013-08-01

    The System Advisor Model (SAM) is a broad and robust set of models and frameworks for analyzing both system performance and system financing. It does this across a range of technologies dominated by solar technologies including photovoltaics (PV) and concentrated solar power (CSP). The U.S. Department of Energy (DOE) Solar Energy Technology Program requested the SAM development team to review the photovoltaic performance modeling with the development community and specifically, with the independent engineering community. The report summarizes the major effort for this technical review committee (TRC).

  17. PROCEEDINGS OF RIKEN BNL RESEARCH CENTER WORKSHOP: VOLUME 69 RBRC SCIENTIFIC REVIEW COMMITTEE MEETING

    International Nuclear Information System (INIS)

    SAMIOS, N.P.

    2005-01-01

    operational. A 10 teraflops QCDOC computer is under construction and expected to be completed this year. About 30 presentations are included in the volume. Session titles included: The First Results of Lattice QCD with Dynamical Domain Wall Fermions; The Kaon B-Parameter Using Two Dynamical Flavours of Domain Wall Fermions; D Meson Spectroscopy and Nucleon Structure on the Lattice with Domain Wall Fermions; Lattice Calculation of the Neutron Electric Dipole Moment; 1=2 S-wave Pion Scattering Phase Shift with Two Flavor Dynamical Quark Effect; The Study of Pentaquark from QCD; Meson Spectral Functions at Zero and Finite Temperature; Matrix Product Variational Formulation for Lattice Gauge Theory; Instantons and the Spin of the Nucleon; Melting Pattern of Diquark Condensates in Quark Matter; Hydrodynamic Afterburner for the Color Glass Condensate at RHIC; Photon Interferometry of Au+Au Collisions at the Relativistic Heavy-Ion Collider; Odderon Evolution in the Color Glass Condensate; Classical and Semi-classical Aspects of Many-body Field Theories; Impact Parameter Dependence in the Balitsky-Kovchegov Equation and the Froissart Bound; Dynamic Universality Class of the QCD Critical Point; QCD Aspects of the NuTeV Anomaly; Physics of Ultrahigh-energy Cosmic Rays; Flow and High P T Suppression in Central Gold Collisions; J/Π -> μμ in √s= 200 GeV p-p, d-Au and Au-Au Collisions; Single-inclusive Cross Sections and Spin Asymmetries in Hadronic Collisions; Measurement of Prompt Photon in √s = 200 GeV pp Collisions; Measurement of Single Electrons in √s NN = 62.4 GeV Au+Au Collisions at RHIC-PHENIX; PHENIX Spin Physics Run 4 and Beyond; The New Siberian Snake in the AGS; Polarimetry and Physics of pC and pp Elastic Scattering; Transverse Spin Physics at RHIC: Present and Future; CCJ Status The Computer Facility at IWZN; PHENIX Muon Trigger Upgrade; Silicon Vertex Tracker (VTX) Work; Relative Luminosity Measurement at PHENIX; and QCDSP/QCDOC: Physics Results and Prospects/Project

  18. Iodine-based contrast media, multiple myeloma and monoclonal gammopathies: literature review and ESUR Contrast Media Safety Committee guidelines.

    Science.gov (United States)

    Stacul, Fulvio; Bertolotto, Michele; Thomsen, Henrik S; Pozzato, Gabriele; Ugolini, Donatella; Bellin, Marie-France; Bongartz, Georg; Clement, Olivier; Heinz-Peer, Gertraud; van der Molen, Aart; Reimer, Peter; Webb, Judith A W

    2018-02-01

    Many radiologists and clinicians still consider multiple myeloma (MM) and monoclonal gammopathies (MG) a contraindication for using iodine-based contrast media. The ESUR Contrast Media Safety Committee performed a systematic review of the incidence of post-contrast acute kidney injury (PC-AKI) in these patients. A systematic search in Medline and Scopus databases was performed for renal function deterioration studies in patients with MM or MG following administration of iodine-based contrast media. Data collection and analysis were performed according to the PRISMA statement 2009. Eligibility criteria and methods of analysis were specified in advance. Cohort and case-control studies reporting changes in renal function were included. Thirteen studies were selected that reported 824 iodine-based contrast medium administrations in 642 patients with MM or MG, in which 12 unconfounded cases of PC-AKI were found (1.6 %). The majority of patients had intravenous urography with high osmolality ionic contrast media after preparatory dehydration and purgation. MM and MG alone are not risk factors for PC-AKI. However, the risk of PC-AKI may become significant in dehydrated patients with impaired renal function. Hypercalcaemia may increase the risk of kidney damage, and should be corrected before contrast medium administration. Assessment for Bence-Jones proteinuria is not necessary. • Monoclonal gammopathies including multiple myeloma are a large spectrum of disorders. • In monoclonal gammopathy with normal renal function, PC-AKI risk is not increased. • Renal function is often reduced in myeloma, increasing the risk of PC-AKI. • Correction of hypercalcaemia is necessary in myeloma before iodine-based contrast medium administration. • Bence-Jones proteinuria assessment in myeloma is unnecessary before iodine-based contrast medium administration.

  19. The activities of the committee 'Kernreaktorregelung' (nuclear reactor control) in the past few years and future projects

    International Nuclear Information System (INIS)

    Knecht, O.

    1976-01-01

    Results achieved so far and future projects are portrayed in detail: 1) VDI/VDE 3527-Graphical symbols for nuclear reactor control; 2) VDI/VDE 3528-Special terms and definitons for nuclear reactor control; 3) 8 data sheets on reactor control; 4) VDI/VDE 3530-Characterisation of reactor control rod drives. (orig./HP) [de

  20. Out of the frying pan? Streamlining the ethics review process of multisite qualitative research projects.

    Science.gov (United States)

    Iedema, Rick A M; Allen, Suellen; Britton, Kate; Hor, Suyin

    2013-05-01

    This paper describes the ethics approval processes for two multicentre, nationwide, qualitative health service research projects. The paper explains that the advent of the National Ethics Application Form has brought many improvements, but that attendant processes put in place at local health network and Human Research Ethics Committee levels may have become significantly more complicated, particularly for innovative qualitative research projects. The paper raises several questions based on its analysis of ethics application processes currently in place. WHAT IS KNOWN ABOUT THE TOPIC? The complexity of multicentre research ethics applications for research in health services has been addressed by the introduction of the National Ethics Application Form. Uptake of the form across the country's human research ethics committees has been uneven. WHAT DOES THIS PAPER ADD? This paper adds detailed insight into the ethics application process as it is currently enacted across the country. The paper details this process with reference to difficulties faced by multisite and qualitative studies in negotiating access to research sites, ethics committees' relative unfamiliarity with qualitative research , and apparent tensions between harmonisation and local sites' autonomy in approving research. WHAT ARE THE IMPLICATIONS FOR PRACTITIONERS? Practitioners aiming to engage in research need to be aware that ethics approval takes place in an uneven procedural landscape, made up of variable levels of ethics approval harmonization and intricate governance or site-specific assessment processes.

  1. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack; Hwang, Diana

    1984-11-01

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  2. Review of the project risk management plan in the capital projects organization at ConocoPhillips

    OpenAIRE

    Meidell, Camilla

    2011-01-01

    Master's thesis in Risk management Project Risk Management (PRM) has in recent years become an important aspect of business organization and project management. There has always been a requirement for some risk management at COPNO. However about 3 years ago the process became much more defined and has become a requirement for the contingency used on projects to be based upon the risking process. Since risk management in projects is a requirement in the CP organization it is ...

  3. Anchoring contextual analysis in health policy and systems research: A narrative review of contextual factors influencing health committees in low and middle income countries.

    Science.gov (United States)

    George, Asha; Scott, Kerry; Garimella, Surekha; Mondal, Shinjini; Ved, Rajani; Sheikh, Kabir

    2015-05-01

    Health committees, councils or boards (HCs) mediate between communities and health services in many health systems. Despite their widespread prevalence, HC functions vary due to their diversity and complexity, not least because of their context specific nature. We undertook a narrative review to better understand the contextual features relevant to HCs, drawing from Scopus and the internet. We found 390 English language articles from journals and grey literature since 1996 on health committees, councils and boards. After screening with inclusion and exclusion criteria, we focused on 44 articles. Through an iterative process of exploring previous attempts at understanding context in health policy and systems research (HPSR) and the HC literature, we developed a conceptual framework that delineates these contextual factors into four overlapping spheres (community, health facilities, health administration, society) with cross-cutting issues (awareness, trust, benefits, resources, legal mandates, capacity-building, the role of political parties, non-governmental organizations, markets, media, social movements and inequalities). While many attempts at describing context in HPSR result in empty arenas, generic lists or amorphous detail, we suggest anchoring an understanding of context to a conceptual framework specific to the phenomena of interest. By doing so, our review distinguishes between contextual elements that are relatively well understood and those that are not. In addition, our review found that contextual elements are dynamic and porous in nature, influencing HCs but also being influenced by them due to the permeability of HCs. While reforms focus on tangible HC inputs and outputs (training, guidelines, number of meetings held), our review of contextual factors highlights the dynamic relationships and broader structural elements that facilitate and/or hinder the role of health committees in health systems. Such an understanding of context points to its

  4. Strategic appraisal of environmental risks: a contrast between the United Kingdom's Stern Review on the Economics of Climate Change and its Committee on Radioactive Waste Management.

    Science.gov (United States)

    Dietz, Simon; Morton, Alec

    2011-01-01

    In this article, we compare two high-profile strategic policy reviews undertaken for the U.K. government on environmental risks: radioactive waste management and climate change. These reviews took very different forms, both in terms of analytic approach and deliberation strategy. The Stern Review on the Economics of Climate Change was largely an exercise in expert modeling, building, within a cost-benefit framework, an argument for immediate reductions in carbon emissions. The Committee on Radioactive Waste Management, on the other hand, followed a much more explicitly deliberative and participative process, using multicriteria decision analysis to bring together scientific evidence and stakeholder and public values. In this article, we ask why the two reviews were different, and whether the differences are justified. We conclude that the differences were mainly due to political context, rather than the underpinning science, and as a consequence that, while in our view "fit for purpose," they would both have been stronger had they been less different. Stern's grappling with ethical issues could have been strengthened by a greater degree of public and stakeholder engagement, and the Committee on Radioactive Waste Management's handling of issues of uncertainty could have been strengthened by the explicitly probabilistic framework of Stern. © 2010 Society for Risk Analysis.

  5. 18 CFR 806.4 - Projects requiring review and approval.

    Science.gov (United States)

    2010-04-01

    ... result of a change of the name, identity, internal corporate structure or place of organization and does... period, and undergoing a change of ownership, unless such project satisfies the requirements of..., and undergoing a change of ownership, unless such project satisfies the requirements of paragraphs (b...

  6. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab

  7. A desk evaluation review of project VIE/4/009 design and production of nuclear instruments. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-09

    A Project Desk Evaluation (PDE) is an intensive review process, using agreed guidelines, of the design, implementation, and the output of a project. This project is exclusively dealing with the design and production of nuclear instruments. The aim of this project would be to develop a viable capability for maintenance and repair of the nuclear instruments at the Dalat Research Institute (DNRI), the premier nuclear centre in Viet Nam, and also to meet the steadily increasing needs of DNRI, as well as of other national institutions, hospitals and universities engaged in the application of nuclear technologies, particularly in the southern part of the country. Project Summary with financial data is given along with training programme. 1 tab.

  8. A desk evaluation review of project POL/5/006 plant breeding using induced mutations. Project desk evaluation

    International Nuclear Information System (INIS)

    1993-01-01

    Projects POL/5/006 was initiated in 1985 to assist the Government of Poland in improving the mutation breeding efforts in the country to promote the development of new and higher yielding crop varieties. The difficult economic situation in the country at this time restricted the procurement of special equipment, spare parts and supplies from abroad and, therefore, impeded research and development work in this field. The project was implemented using a distinctive approach and design characterized by having six recipient institutions and the establishment of one central gamma-irradiation facility to be made available to all participating institutions for mutation induction. The project was formally closed in 1989. The review of project POL/5/006 was undertaken in accord with the expressed wishes of the Board of Governors for selected ex-post evaluations of completed projects. The main purpose of the review was to ascertain if the project objectives were achieved, and to determine what impact the technical assistance provided may have had on continued post-project and current plant breeding programmes in Poland

  9. A desk evaluation review of project POL/5/006 plant breeding using induced mutations. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-09-14

    Projects POL/5/006 was initiated in 1985 to assist the Government of Poland in improving the mutation breeding efforts in the country to promote the development of new and higher yielding crop varieties. The difficult economic situation in the country at this time restricted the procurement of special equipment, spare parts and supplies from abroad and, therefore, impeded research and development work in this field. The project was implemented using a distinctive approach and design characterized by having six recipient institutions and the establishment of one central gamma-irradiation facility to be made available to all participating institutions for mutation induction. The project was formally closed in 1989. The review of project POL/5/006 was undertaken in accord with the expressed wishes of the Board of Governors for selected ex-post evaluations of completed projects. The main purpose of the review was to ascertain if the project objectives were achieved, and to determine what impact the technical assistance provided may have had on continued post-project and current plant breeding programmes in Poland.

  10. Presentations for the 1st muon science experimental facility advisory committee meeting (MuSAC)

    International Nuclear Information System (INIS)

    2003-03-01

    The J-PARC Muon Science Advisory Committee, so called 'MuSAC', is organized under the J-PARC Project Director during construction period, in order to discuss the following items related to the Muon Science Facility at J-PARC and to report to the Project Director and Muon Science Facility construction team. The committee will review and advise the following subjects: 1) Project definition of the experimental facility to be constructed in Materials and Life Science Facility of J-PARC, 2) Content of the 1st phase experimental program. This issue is the collection of the documents presented at the title meeting. (J.P.N.)

  11. Euthanasia and physician-assisted suicide not meeting due care criteria in the Netherlands: a qualitative review of review committee judgements.

    Science.gov (United States)

    Miller, David Gibbes; Kim, Scott Y H

    2017-10-25

    ObjectivesTo assess how Dutch regional euthanasia review committees (RTE) apply the euthanasia and physician-assisted suicide (EAS) due care criteria in cases where the criteria are judged not to have been met ('due care not met' (DCNM)) and to evaluate how the criteria function to set limits in Dutch EAS practice. A qualitative review using directed content analysis of DCNM cases in the Netherlands from 2012 to 2016 published on the RTE website (https://www.euthanasiecommissie.nl/) as of 31 January 2017. Of 33 DCNM cases identified (occurring 2012-2016), 32 cases (97%) were published online and included in the analysis. 22 cases (69%) violated only procedural criteria, relating to improper medication administration or inadequate physician consultation. 10 cases (31%) failed to meet substantive criteria, with the most common violation involving the no reasonable alternative (to EAS) criterion (seven cases). Most substantive cases involved controversial elements, such as EAS for psychiatric disorders or 'tired of life', in incapacitated patients or by physicians from advocacy organisations. Even in substantive criteria cases, the RTE's focus was procedural. The cases were more about unorthodox, unprofessional or overconfident physician behaviours and not whether patients should have received EAS. However, in some cases, physicians knowingly pushed the limits of EAS law. Physicians from euthanasia advocacy organisations were over-represented in substantive criteria cases. Trained EAS consultants tended to agree with or facilitate EAS in DCNM cases. Physicians and families had difficulty applying ambiguous advance directives of incapacitated patients. As a retrospective review of physician self-reported data, the Dutch RTEs do not focus on whether patients should have received EAS, but instead primarily gauge whether doctors conducted EAS in a thorough, professional manner. To what extent this constitutes enforcement of strict safeguards, especially when cases contain

  12. Standing Concertation Committee

    CERN Document Server

    HR Department

    2009-01-01

    Main points examined at the meeting of 24 June 2009 Results of the 2009 MARS exercise The Committee took note of the results of the 2009 MARS exercise presented by the Head of the HR Department, expressing satisfaction for the early availability of the statistics and for the fact that the analysis of the results covered the last three years. Status report on the work on the five-yearly review The Committee took note of a presentation by P. Gildemyn on the data collection procedure for the 2010 five-yearly review (staff, fellows, associate members of the personnel, CHIS) and of the proposed work schedule. Implications for employment conditions of the discussions at the Finance Committee and Council on 17 and 18 June 2009 The Chairman briefly reported on the discussions at the meetings of the Finance Committee and Council in June 2009, on the 2010-2014 medium-term plan and the 2010 preliminary draft budget, as well as on the modified strategy and goals for 2009. The Committee ...

  13. Audit committee: Some evidence from Malaysia.

    Directory of Open Access Journals (Sweden)

    Zulkarnain Muhamad Sori

    2006-11-01

    Full Text Available This study aimed to investigate the perceptions of senior managers of Malaysian publicly listed companies on issues relating to audit committee authority and effectiveness. Questionnaire survey technique was employed to seek the respondents perceptions on five issues, namely audit committee appoints the auditor, audit committee determines and reviews audit fees, audit committee determines and reviews the auditor’s scope and duties, and audit committee’s reports and meetings. The majority of respondents agreed that auditor would be more effective and independent if audit committee assumed the responsibility to appoint the auditor, determine and review the audit fees, and determine and review the external auditor’s scope and duties. It is also found that disclosure of audit committee report and quarterly meeting would enhance the perceptions of users of financial statement concerning the effectiveness of the committee.

  14. Review of geography internship of convective wave project

    Science.gov (United States)

    Rademacher, Kurt R.; Collins, Charles

    1990-01-01

    The internship of the author is examined in detail. The acquisition of the internship, the personnel of the project, the project itself, and the goals associated with it are described. The authors orientation to the internship, the project's operations, and the conclusion of the findings are also described. The overall goal of the project was to determine the effect of convective waves on wind speeds in the middle and upper troposphere, and how these waves affect the general circulation on a global scale. A more specific goal of the author was the satellite analysis of cloud street formations. This was done to determine frequency and areas in which cloud streets occur off the East Asian and North American coastlines.

  15. Report and recommendations of the Pingston Hydroelectric Project Committee with respect to the issuance of a project approval certificate pursuant to the Environmental Assessment Act, R.S.B.C. 1966, c.119 and fulfilling the requirements for a screening report pursuant to the Canadian Environmental Assessment Act, 1992 c.37, V.1

    International Nuclear Information System (INIS)

    1999-05-01

    A final application was submitted in March 1998 by Canadian Hydro Developers (CHD) with the intent of obtaining a Project Approval certificate under the Act for development of the Project. The purpose of the project committee report is to summarize the application and project report, to describe the potential environmental, economic, social, cultural, heritage and health effects of the project and measures required to mitigate significant adverse effects and to document the recommendations of the committee. The Project is composed of five main parts including the headworks, tunnel, penstock, powerhouse and transmission line. The potential environmental effects of the Project relate mainly to fisheries resources including entrainment at the intake, instream flow needs downstream from the headworks, alteration of fish habitat, sedimentation, and blockage of fish passage. CHD expects to minimize these effects through facility design modifications, operational changes and monitoring programs as required. Other concerns such as alteration of creek temperature, generation of methyl mercury in reservoirs, greenhouse gas flux in reservoirs and total gas pressures have been examined in light of the Project's size and operational schenarios, and the proponent expects these effects to be of minor concern. The Project Committee concluded that the project, with successful implementation and compliance of mitigation and compensation strategies, is not expected to cause significant adverse effects

  16. Formal design review report project W-151 mixer pump procurement

    Energy Technology Data Exchange (ETDEWEB)

    Crass, D.W.

    1997-01-21

    A formal design review for WHC-S-0040 was held on January 21, 1993. The review was completed January 29, 1993. No outstanding action items existed. Comments were recorded on Record Comment Record (RCR) forms and incorporated into the specification. The specification was considered acceptable, approved and issued as WHC-S-0040, Rev. 0 on March 4, 1993.

  17. REVIEW ON CONSTRUCTION PROJECT MANAGEMENT SOFTWARE PRIMAVERA P6

    OpenAIRE

    Piyush Pramod Bagade* & Prof. Abhijit Bhirud

    2018-01-01

    Planning, scheduling and Resource levelling plays an important role in any construction project maybe it is construction of building or construction of road. In absence of proper planning, scheduling and resource levelling construction industry does not get profit over the project. For this purpose, proper software’s and techniques must be utilize. This paper is focussing on the advantages of Oracle Primavera P6 Software. The latest version of Primavera is P6-17. In any construction work huge...

  18. Conclusions of the Ad-hoc Review Committee (ARC) on the International Commission on Stratigraphy (ICS) of the International Union of Geological Sciences (IUGS) (Paris, 7-8 November 2005)

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    @@ Background Following the recommendations of the IUGS Strategic Planning Committee (2000) and IUGS Strategic Action Plan (2001)to appoint Ad-hoc Review Committees (ARCs) to hold reviewsof all IUGS-funded scientific activities on a regular basis, theIUGS Executive Committee decided at its last meeting in Vilnius, Lithuania (March 2005) that an ARC should be convened toreview the IUGS International Commission on. Stratigraphy(ICS). ICS has been part of IUGS since 1965, and the last reviewof ICS by the IUGS was in 1995.

  19. Status of India's population education programme--the subject of tripartite projects review and annual country review.

    Science.gov (United States)

    1981-12-01

    A 3-step monitoring of India's population education program was undertaken in 1981 in order to determine the level of implementation and progress of the program. This monitoring program, conducted by the Unesco Mobile Team in collaboration with other institutions, followed 3 procedures: Project Progress Report (PPR); Tripartite Project Review (TPR); and Annual Country Review (ACR). The review meetings of the 10 state population education projects were organized at Chandigarh and Madras during August. The states covered in the review were Bihar, Haryana, Madhaya Pradesh, Punjab, Rajasthan, Chandigarh, Gujarat, Karnataka, Maharashtra, and Tamil Nadu. The Tripartite Review identified the following as problems which were hindering the smooth implementation of the population education program: 1) difficulty in spending funds unless certain formalities were completed by the governments of the states; 2) administrative problems such as getting printing paper for instructional materials, waiving the sales tax for equipment to be purchased under the project, and uncertainty regarding the admissible rates of per diem to be paid to the participants in various training programs; 3) the lack of experience of project staff; 4) problems created by having more than 1 cell in a state such as Rajasthan; and 5) an inadequate time frame within which the project should complete all its activities and make population education an integral part of the school system. The following were among the recommendations made: 1) the Project should be made coterminous with the 6th Five-Year Plan up to March 31, 1985; and 2) there should be only 1 Population Education Cell in every state. Among the points discussed at the annual country review, held during October, were the following: rephasing of the program from a 3 to 5 year project to synchronize it with the 6th plan; and the need for additional funds in view of inflation.

  20. Report to the DOE Nuclear Data Committee

    International Nuclear Information System (INIS)

    Lundy, J.C.; Perey, F.G.

    1980-04-01

    This report was prepared for the DOE Nuclear Data Committee and covers work performed at ORNL since April 1979 in areas of nuclear data of relevance to the US applied nuclear energy program. The report was mostly generated through a review of abstracts of work completed to the point of being subjected to some form of publication in the open literature, formal ORNL reports, ORNL technical memoranda, progress reports, or presentation at technical conferences. As much as possible the complete abstract of the original publication is reproduced with only minor editing. In a few cases progress reports were written specifically for this publication. The editors selected the materials to be included in this report on the basis of perceived interests of DOE Nuclear Data Committee members and cannot claim completeness. Material is grouped as follows: Nuclear Cross Sections for Technology conference, cross section measurements, data analyses, and Nuclear Data Project activities for 1979. 2 figures

  1. Preliminary design review report for K Basin Dose Reduction Project

    International Nuclear Information System (INIS)

    Blackburn, L.D.

    1996-01-01

    The strategy for reducing radiation dose, originating from radionuclides absorbed in the K East Basin concrete, is to raise the pool water level to provide additional shielding. This report documents a preliminary design review conducted to ensure that design approaches for cleaning/coating basin walls and modifying other basin components were appropriate. The conclusion of this review was that design documents presently conclusion of this review was that design documents presently completed or in process of modification are and acceptable basis for proceeding to complete the design

  2. A review of Studsvik's international power ramp test projects

    International Nuclear Information System (INIS)

    Mogard, H.; Kjaer-Pedersen, N.

    1985-11-01

    Since 1975 a series of internationally sponsored fuel irradiation research projects have been and are being conducted at Studsvik, Sweden, under the management of Studsvik Energiteknik AB. The sponsoring parties comprise fuel vendors, nuclear power utilities, national research organizations and, in some cases, safety authorities. Geographically the parties represent organizations in Europe, Japan, and the USA. The main research topic of the Studsvik projects is the Pellet Clad Interaction (PCI) induced Stress Corrosion Cracking (SCC) failure occurrence in LWR fuel under power ramping conditions. The research is conducted in the 50 MW R2 test reactor and the associated hot cell laboratory. Prior to the experiments the test fuel is base irradiated, normally in commercially operated light water reactors. Results have been published for the INTER-RAMP, OVER-RAMP, DEMO-RAMP I, DEMO-RAMP II and SUPER-RAMP projects. The release of the TRANS-RAMP I results is imminent. There are two ongoing projects, i.e. SUPER-RAMP EXTENSION and TRANS-RAMP II. The paper presents an overview of the objectives and main results of the various projects. An attempt is made to summarize the more important observations on PCI failure performance in the perspective of design parameters, fuel burnup levels, power histories, power ramp rates, etc. With 14 refs. (Author)

  3. 12 CFR 620.30 - Audit committees.

    Science.gov (United States)

    2010-01-01

    ... shareholders; review the impact of any significant accounting and auditing developments; review accounting policy changes relating to preparation of financial statements; and review annual and quarterly reports..., financial reporting and disclosure, or accounting procedures. (b) Independence. Every audit committee member...

  4. Review of fusion research program: historical summary and program projections

    Energy Technology Data Exchange (ETDEWEB)

    Murphy, E.S.

    1976-09-01

    This report provides a brief review of the history and current status of fusion research in the United States. It also describes the Federally funded program aimed at the development of fusion reactors for electric power generation.

  5. Viewpoint: Decision-making in committees

    OpenAIRE

    Li Hao; Wing Suen

    2009-01-01

    This article reviews recent developments in the theory of committee decision-making. A committee consists of self-interested members who make a public decision by aggregating imperfect information dispersed among them according to a pre-specified decision rule. We focus on costly information acquisition, strategic information aggregation, and rules and processes that enhance the quality of the committee decision. Seeming inefficiencies of the committee decision-making process such as over-cau...

  6. Enhancement and creation of secondary channel habitat: Review of project performance across a range of project types and settings

    Science.gov (United States)

    Epstein, J.; Lind, P.

    2017-12-01

    Secondary channels provide critical off-channel habitat for key life stages of aquatic species. In many systems, interruption of natural processes via anthropogenic influences have reduced the quantity of secondary channel habitat and have impaired the processes that help form and maintain them. Creation and enhancement of secondary channels is therefore a key component of stream rehabilitation, particularly in the Pacific Northwest where the focus has been on enhancement of habitat for ESA-listed salmonids. Secondary channel enhancement varies widely in scope, scale, and approach depending on species requirements, hydrology/hydraulics, geomorphologic setting, sediment dynamics, and human constraints. This presentation will review case studies from numerous secondary channel projects constructed over the last 20 years by different entities and in different settings. Lessons learned will be discussed that help to understand project performance and inform future project design. A variety of secondary channel project types will be reviewed, including mainstem flow splits, year-round flow through, seasonally activated, backwater alcove, natural groundwater-fed, and engineered groundwater-fed (i.e. groundwater collection galleries). Projects will be discussed that span a range of project construction intensities, such as full excavation of side channels, select excavation to increase flow, or utilizing mainstem structures to activate channels. Different configurations for connecting to the main channel, and their relative performance, will also be presented. A variety of connection types will be discussed including stabilized channel entrance, free-formed entrance, using bar apex jams to split flows, using `bleeder' jams to limit secondary channel flow, and obstructing the main channel to divert flows into secondary channels. The performance and longevity of projects will be discussed, particularly with respect to the response to sediment mobilizing events. Lessons

  7. Systematic Review Methodology for the Fatigue in Emergency Medical Services Project

    Science.gov (United States)

    2018-01-11

    Background: Guidance for managing fatigue in the Emergency Medical Services (EMS) setting is limited. The Fatigue in EMS Project sought to complete multiple systematic reviews guided by seven explicit research questions, assemble the best available e...

  8. Army Corps of Engineers: Peer Review Process for Civil Works Project Studies Can Be Improved

    Science.gov (United States)

    2012-03-01

    exceeding $45 million EIS Cost of peer review contract Western C-111 Spreader Canal Project Implementation Report Jacksonville South...Federal Programs Congressional Relations Public Affairs Please Print on Recycled Paper.

  9. Demonstrating sustainable energy: A review-based model of sustainable energy demonstration projects

    NARCIS (Netherlands)

    Bossink, Bart

    2017-01-01

    This article develops a model of sustainable energy demonstration projects, based on a review of 229 scientific publications on demonstrations in renewable and sustainable energy. The model addresses the basic organizational characteristics (aim, cooperative form, and physical location) and learning

  10. Review of Time Management for the Research Reactor Project

    International Nuclear Information System (INIS)

    Park, Kook-Nam; Park, Su-Jin; Choi, Min-Ho; Yoon, Hyung-Mo; Kim, Hyeonil; Lee, Eung-Jae

    2016-01-01

    In this paper, the processes for the time management, which have actually been implemented for JRTR, are presented. In JRTR, a master schedule was submitted in December 2012 whereas the project was contracted in October 2010. The schedule includes fixing the Engineering Deliverable List (EDL), the list of equipment, the actual issue date, the results of Primavera, a piece of software to manage progress, the progress rate and the issuance of the schedule based on the Project level III. Afterwards JAEC approved to the extension of the schedule from 56 months to 70.5 months mainly due to late preparation of the Jordanian nuclear legislative system. The project schedule was updated up to the fifth revision to compensate the delay by recovering measures such as for design, purchase, construction, and finally the owner of the project, Jordanian Atomic Energy Commission (JAEC) approved in August 2014. Construction work, the prerequisite for commissioning stage A had been finished in February 2016, and commissioning stage A has been being performed

  11. Review of Time Management for the Research Reactor Project

    Energy Technology Data Exchange (ETDEWEB)

    Park, Kook-Nam; Park, Su-Jin; Choi, Min-Ho; Yoon, Hyung-Mo; Kim, Hyeonil [KAERI, Daejeon (Korea, Republic of); Lee, Eung-Jae [DAEWOO E and C, Seoul (Korea, Republic of)

    2016-05-15

    In this paper, the processes for the time management, which have actually been implemented for JRTR, are presented. In JRTR, a master schedule was submitted in December 2012 whereas the project was contracted in October 2010. The schedule includes fixing the Engineering Deliverable List (EDL), the list of equipment, the actual issue date, the results of Primavera, a piece of software to manage progress, the progress rate and the issuance of the schedule based on the Project level III. Afterwards JAEC approved to the extension of the schedule from 56 months to 70.5 months mainly due to late preparation of the Jordanian nuclear legislative system. The project schedule was updated up to the fifth revision to compensate the delay by recovering measures such as for design, purchase, construction, and finally the owner of the project, Jordanian Atomic Energy Commission (JAEC) approved in August 2014. Construction work, the prerequisite for commissioning stage A had been finished in February 2016, and commissioning stage A has been being performed.

  12. Project-Based Learning: A Review of the Literature

    Science.gov (United States)

    Kokotsaki, Dimitra; Menzies, Victoria; Wiggins, Andy

    2016-01-01

    Project-based learning (PBL) is an active student-centred form of instruction which is characterised by students' autonomy, constructive investigations, goal-setting, collaboration, communication and reflection within real-world practices. It has been explored in various contexts and in different phases of schooling, from primary to higher…

  13. The Structure and Application of High Level Safety Goals. A Review by the MDEP Sub-committee on Safety Goals

    International Nuclear Information System (INIS)

    2011-01-01

    One of the aims of MDEP is to work towards greater harmonisation of regulatory requirements. To achieve this aim, it is necessary that there is a degree of convergence on the safety goals that are required to be met by designers and operators. The term 'safety goals' is defined to cover all health and safety requirements which must be met: these may be deterministic rules and/or probabilistic targets. They should cover the safety of workers, public and the environment in line with the IAEA's Basic Safety Objective; encompassing safety in normal operation through to severe accidents. All regulators have safety goals, but these are expressed in many different ways and exercises in comparing them frequently are done at a very low level eg specific temperatures in the reactor vessel. The differences in the requirements from different regulators are difficult to resolve as the goals are derived using different principles and assumptions and are for a specific technology. Therefore MDEP set up a sub-committee to investigate a different approach. This approach was to start with the top level goals and to derive a structure and means of deriving lower tier goals that can be seen to be clearly related to the higher level ones. This approach has the potential to greatly assist in the process of harmonisation of regulatory requirements. The paper reviews the high level goals used in MDEP countries and the relevant work of international groups. From these it draws broad conclusions that the form of the framework should be an Hierarchical Structure of Safety Goals, incorporating an extended Defense-in-Depth approach. The basis concept is that the higher level safety goals can then developed, in a coherent and consistent manner, into lower level safety goals and targets that can be applied within the design and operation of reactors, with a clear connection between the different levels. This structured approach is technology-neutral and is sufficiently flexible that it can be

  14. An Approach to Tailoring Major Technical Reviews Based on Project Characteristics and Stakeholder Interests

    Science.gov (United States)

    Richstein, Alan B.; Nolte, Jerome T.; Pfarr, Barbara B.

    2004-01-01

    There are numerous technical reviews that occur throughout the systems engineering process life cycle. Many are well known by project managers and stakeholders such as developers and end users, an example of much is the critical design review (CDR). This major milestone for a large, complex new project may last two or more days, include an extensive agenda of topics, and entail hundreds of hours of developer time to prepare presentation materials and associated documents. Additionally, the weeks of schedule spent on review preparation is at least partly at the expense of other work. This paper suggests an approach for tailoring technical reviews, based on the project characteristics and the project manager s identification of the key stakeholders and understanding of their most important issues and considerations. With this insight the project manager can communicate to, manage expectations oc and establish formal agreement with the stakeholders as to which reviews, and at what depth, are most appropriate to achieve project success. The authors, coming from diverse organizations and backgrounds, have drawn on their personal experiences and summarized the best practices of their own organizations to create a common framework to provide guidance on the adaptation of design reviews to other system engineers.

  15. A retrospective review of required projects in systems-based practice in a single anesthesiology residency: a 10-year experience.

    Science.gov (United States)

    Sakai, Tetsuro; Emerick, Trent D; Patel, Rita M

    2015-09-01

    The Accreditation Council for Graduate Medical Education has emphasized in its core competencies and more recently, in its Milestones Project, that residents understand the importance of systems-based practice (SBP). The objectives of the study are to evaluate the quality of residents' SBP projects and to determine the degrees that were subsequently implemented. A retrospective educational observational study. A university-based anesthesiology training institution. One hundred forty-nine anesthesiology residents in their final (postgraduate year 4) year of training who completed SBP projects for the last 10 years (2004-2013). A structured SBP course was provided for postgraduate year 4 anesthesiology residents with deadlines set such as project identification, data collection, and proposal draft. Each resident's written SBP proposal received inputs by 2 members of the department executive steering committee. The SBP projects concluded with oral presentations by each resident to the department executive steering committee, who provided overall scores. All SBP projects were categorized into 7 categories: safety initiatives, economic analysis, process analysis, policy change recommendations, education initiatives, teamwork/communication, and operating room efficiency. Evaluation scores using a Likert scale (1-9, where 9 is the best) were analyzed. The rate of implementation of project ideas within the department based on the presentations to the executive committee was examined. Of 149 projects, policy change recommendations was the most frequently chosen category (46 projects; 30.9%), followed by process analysis (36 projects; 24.2%). The overall evaluation score was 7.6 ± 0.6 (mean ± SD). A total of 53 projects (35.6%) were implemented in the department. There was no statistical difference between SBPs with implementation vs SBPs without implementation in terms of evaluation scores, year of the presentation, or categories. This SBP project has given residents the

  16. ITER management advisory committee meeting

    International Nuclear Information System (INIS)

    Yoshikawa, M.

    2001-01-01

    The ITER Management Advisory Committee (MAC) Meeting was held on 23 February in Garching, Germany. The main topics were: the consideration of the report by the Director on the ITER EDA Status, the review of the Work Programme, the review of the Joint Fund, the review of a schedule of ITER meetings, and the arrangements for termination and wind-up of the EDA

  17. An Accurate and Impartial Expert Assignment Method for Scientific Project Review

    Directory of Open Access Journals (Sweden)

    Mingliang Yue

    2017-12-01

    Full Text Available Purpose: This paper proposes an expert assignment method for scientific project review that considers both accuracy and impartiality. As impartial and accurate peer review is extremely important to ensure the quality and feasibility of scientific projects, enhanced methods for managing the process are needed. Design/methodology/approach: To ensure both accuracy and impartiality, we design four criteria, the reviewers’ fitness degree, research intensity, academic association, and potential conflict of interest, to express the characteristics of an appropriate peer review expert. We first formalize the expert assignment problem as an optimization problem based on the designed criteria, and then propose a randomized algorithm to solve the expert assignment problem of identifying reviewer adequacy. Findings: Simulation results show that the proposed method is quite accurate and impartial during expert assignment. Research limitations: Although the criteria used in this paper can properly show the characteristics of a good and appropriate peer review expert, more criteria/conditions can be included in the proposed scheme to further enhance accuracy and impartiality of the expert assignment. Practical implications: The proposed method can help project funding agencies (e.g. the National Natural Science Foundation of China find better experts for project peer review. Originality/value: To the authors’ knowledge, this is the first publication that proposes an algorithm that applies an impartial approach to the project review expert assignment process. The simulation results show the effectiveness of the proposed method.

  18. Assessment of Smolt Condition for Travel Time Analysis Project, 1987-1997 Project Review.

    Energy Technology Data Exchange (ETDEWEB)

    Schrock, Robin M.; Hans, Karen M.; Beeman, John W. [US Geological Survey, Western Fisheries Research Center, Columbia River Research Laboratory, Cook, WA

    1997-12-01

    The assessment of Smolt Condition for Travel Time Analysis Project (Bonneville Power Administration Project 87-401) monitored attributes of salmonid smolt physiology in the Columbia and Snake River basins from 1987 to 1997, under the Northwest Power Planning Council Fish and Wildlife Program, in cooperation with the Smolt Monitoring Program of the Fish Passage Center. The primary goal of the project was to investigate the physiological development of juvenile salmonids related to migration rates. The assumption was made that the level of smolt development, interacting with environmental factos such as flow, would be reflected in travel times. The Fish Passage Center applied the physiological measurements of smolt condition to Water Budget management, to regulate flows so as to decrease travel time and increase survival.

  19. 42 CFR 137.294 - What is the typical IHS environmental review process for construction projects?

    Science.gov (United States)

    2010-10-01

    ... SELF-GOVERNANCE Construction Nepa Process § 137.294 What is the typical IHS environmental review... impact on the environment, and therefore do not require environmental impact statements (EIS). Under current IHS procedures, an environmental review is performed on all construction projects. During the IHS...

  20. ERG [Engineering Review Group] review of the SRP [Salt Repository Project] salt irradiation effects program: Technical report

    International Nuclear Information System (INIS)

    Clark, D.E.

    1986-11-01

    The Engineering Review Group (ERG) was established by the Office of Nuclear Waste Isolation (ONWI) to help evaluate engineering-related issues in the US Department of Energy's nuclear waste repository program. The August 1985 meeting of the ERG reviewed the Salt Repository Project (SRP) salt irradiation effects program. This report documents the ERG's comments and recommendations on these subjects and the ONWI response to the specific points raised by the ERG

  1. Update of technical coordinating committee activities

    International Nuclear Information System (INIS)

    Alvarado, R.A.

    1995-01-01

    The Technical Coordinating Committee has its origins in the earliest days of implementing the Low-Level Radioactive Waste Policy Act. Between 1982 and 1985, individuals in several of the states felt that coordination among the states would be beneficial to all by affording states a cost-effective method for sharing ideas, discussing alternatives, and presenting solutions to common problems. At the current time, the committee comprises members from each of the sited states. Various compacts, federal agencies, and industry groups participate in committee activities. The Low-Level Management Program provides support for the committee through the provision of logistical support and limited manpower allocation. Activities of the committee have recently focused on waste treatment and minimization technologies. The committee also has worked diligently to see the review of the 3RSTAT computer code completed. The committee has taken a position on various regulatory proposals the past year. The committee expects to continue its work until new sites are brought online

  2. Update of technical coordinating committee activities

    Energy Technology Data Exchange (ETDEWEB)

    Alvarado, R.A.

    1995-12-31

    The Technical Coordinating Committee has its origins in the earliest days of implementing the Low-Level Radioactive Waste Policy Act. Between 1982 and 1985, individuals in several of the states felt that coordination among the states would be beneficial to all by affording states a cost-effective method for sharing ideas, discussing alternatives, and presenting solutions to common problems. At the current time, the committee comprises members from each of the sited states. Various compacts, federal agencies, and industry groups participate in committee activities. The Low-Level Management Program provides support for the committee through the provision of logistical support and limited manpower allocation. Activities of the committee have recently focused on waste treatment and minimization technologies. The committee also has worked diligently to see the review of the 3RSTAT computer code completed. The committee has taken a position on various regulatory proposals the past year. The committee expects to continue its work until new sites are brought online.

  3. Academic and Institutional Review Board Collaboration to Ensure Ethical Conduct of Doctor of Nursing Practice Projects.

    Science.gov (United States)

    Foote, Jan M; Conley, Virginia; Williams, Janet K; McCarthy, Ann Marie; Countryman, Michele

    2015-07-01

    Navigating the regulations to protect human subjects and private health information for Doctor of Nursing Practice (DNP) projects can be a formidable task for students, faculty, and the institutional review board (IRB). Key stakeholders from the University of Iowa College of Nursing and the Human Subjects Office developed a standardized process for DNP students to follow, using a decision algorithm, a student orientation to the human subjects review process conducted by faculty and IRB chairs and staff, and a brief Human Subjects Research Determination form. Over 2 years, 109 students completed the process, and 96.3% of their projects were deemed not to be human subjects research. Every student submitted documentation of adherence to the standardized process. Less time was spent by students, faculty, and the IRB in preparing and processing review requests. The interprofessional collaboration resulted in a streamlined process for the timely review of DNP projects. Copyright 2015, SLACK Incorporated.

  4. Upgrading of oil palm wastes by radiation processing - project review

    International Nuclear Information System (INIS)

    Nahrul Khair Alang Md Rashid

    1998-01-01

    Early works on oil palm waste treatment at MINT started in 1984 with the objective of degrading EFB (Empty Fruit Bunches) by radiation. This idea was shared by JAERI that adopted the research project with MINT in 1986 under the Japanese Science and Technology Agency (STA) programme. The results of these preliminary works show that EFB can be degraded using gamma radiation at a dose of ranging from 500 to 1000 kGy - 50 to 100 times higher than what is considered to be the economic dose. It is generally accepted that the economics of radiation treatment process could only be realised if the treatment dose can be kept below 10 kGy, which was incidentally, during the course of this early works, found to be the pasteurisation dose for oil palm by - products. With these information, MINT and JAERI agreed to pursue further research in this area and formulated a bilateral research co-operation in radiation pasteurisation of EFB and subsequent degradation by cellulolytic fungi or mushrooms. The research has the objective of upgrading EFB, which was not considered as suitable for feed due to its known physical properties as coarse and highly fibrous, to animal feed as well as substrate for mushroom cultivation and enzyme production. In addition to the desire to provide an environment friendly method for waste disposal to a growing industry, the possibility of catalysing the development of livestock industry by commercial farming in the process is another motivation for this project. Malaysia is estimated to be only about 40% self-sufficient in beef production. Thus there is great opportunity for the growth and expansion of this industry in Malaysia. However, growth in ruminant population should not result in the alienation of land for pastures. Among the reasons for the lack of interest in livestock production through commercial farming is the unavailability of local feed material which could be cheaper than imported feed grains, particularly maize. Feed is one the main cost

  5. Upgrading of oil palm wastes by radiation processing - project review

    Energy Technology Data Exchange (ETDEWEB)

    Alang Md Rashid, Nahrul Khair [Malaysian Institute for Nuclear Technology Research (MINT), Bangi (Malaysia)

    1998-07-01

    Early works on oil palm waste treatment at MINT started in 1984 with the objective of degrading EFB (Empty Fruit Bunches) by radiation. This idea was shared by JAERI that adopted the research project with MINT in 1986 under the Japanese Science and Technology Agency (STA) programme. The results of these preliminary works show that EFB can be degraded using gamma radiation at a dose of ranging from 500 to 1000 kGy - 50 to 100 times higher than what is considered to be the economic dose. It is generally accepted that the economics of radiation treatment process could only be realised if the treatment dose can be kept below 10 kGy, which was incidentally, during the course of this early works, found to be the pasteurisationdose for oil palm by - products. With these information, MINT and JAERI agreed to pursue further research in this area and formulated a bilateral research co-operation in radiation pasteurisation of EFB and subsequent degradation by cellulolytic fungi or mushrooms. The research has the objective of upgrading EFB, which was not considered as suitable for feed due to its known physical properties as coarse and highly fibrous, to animal feed as well as substrate for mushroom cultivation and enzyme production. In addition to the desire to provide an environment friendly method for waste disposal to a growing industry, the possibility of catalysing the development of livestock industry by commercial farming in the process is another motivation for this project. Malaysia is estimated to be only about 40% self-sufficient in beef production. Thus there is great opportunity for the growth and expansion of this industry in Malaysia. However, growth in ruminant population should not result in the alienation of land for pastures. Among the reasons for the lack of interest in livestock production through commercial farming is the unavailability of local feed material which could be cheaper than imported feed grains, particularly maize. Feed is one the main cost

  6. Report of the joint review panel : Glacier Power Ltd Dunvegan Hydroelectric Project, Fairview, Alberta

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-12-19

    This paper presented the results of a review of the Dunvegan hydroelectric project proposed for development on Alberta's Peace River. In addition to stating the project's purpose, viability, and benefits, the review examined the potential environmental and socio-economic impacts of the hydroelectric project and outlined conclusions developed through consultation with participants of public hearings. The review included a study of transmission lines needed for the project, and the likely impact of the hydroelectric plant on the Peace River fishery and ice regimes. Geotechnical issues related to slope stability, sedimentation and channel morphology, seismicity, and sedimentation in the region were analyzed. The impact of the project on wildlife, vegetation and forest resources was also examined. The study also examined impacts related to health and safety. Potential cumulative effects were reviewed, and First Nations and Metis concerns were outlined. It was concluded that impacts related to the construction, operation, and decommissioning of the project are not likely to be significant. tabs., figs.

  7. Nuclear Safety advisory committee (NSAC)

    International Nuclear Information System (INIS)

    1999-01-01

    The NNSA convened the 16th NSAC meeting in 1999. The Committee listened to the report by the NNSA relating to the fault of core barrel at the QNPP. And also the NNSA convened the 17th NSAC meeting in Beijing. The Committee listened to the report by the NNSA relating to the review and assessment on the application of CP at the JTNPP and discussed on the granting of CP and the related license conditions at the JTNPP. The Sub-Committee of NSAC of the NNSA on siting convened and enlarged meeting for a consulting with the domestic experts on the issue of seismic response spectrum in design at the JTNPP

  8. Independent management and financial review, Yucca Mountain Project, Nevada. Final report

    International Nuclear Information System (INIS)

    1995-01-01

    The Yucca Mountain Project is one part of the Department of Energy's Office of Civilian Radioactive Waste Management Program (the Program) which was established by the Nuclear Waste Policy Act of 1982, and as amended in 1987. The Program's goal is to site the nation's first geologic repository for the permanent disposal of high-level nuclear waste, in the form of spent fuel rod assemblies, generated by the nuclear power industry and a smaller quantity of Government radioactive waste. The Program, which also encompasses the transportation system and the multipurpose canister system was not the subject of this Report. The subject of this Review was only the Yucca Mountain Project in Nevada. While the Review was directed toward the Yucca Mountain Project rather than the Program as a whole, there are certain elements of the Project which cannot be addressed except through discussion of some Program issues. An example is the Total System Life Cycle Cost addressed in Section 7 of this report. Where Program issues are discussed in this Report, the reader is reminded of the scope limitations of the National Association of Regulatory Utility Commissioners (NARUC) contract to review only the Yucca Mountain Project. The primary scope of the Review was to respond to the specific criteria contained in the NARUC scope of work. In responding to these criteria, the Review Team understood that some interested parties have expressed concern over the requirements of the Nuclear Waste Policy Act relative to the Yucca Mountain Project and the nature of activities currently being carried out by the Department of Energy at the Yucca Mountain Project site. The Review Team has attempted to analyze relevant portions of the Nuclear Waste Policy Act as Amended, but has not conducted a thorough analysis of this legislation that could lead to any specific legal conclusions about all aspects of it

  9. Independent management and financial review, Yucca Mountain Project, Nevada. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-15

    The Yucca Mountain Project is one part of the Department of Energy`s Office of Civilian Radioactive Waste Management Program (the Program) which was established by the Nuclear Waste Policy Act of 1982, and as amended in 1987. The Program`s goal is to site the nation`s first geologic repository for the permanent disposal of high-level nuclear waste, in the form of spent fuel rod assemblies, generated by the nuclear power industry and a smaller quantity of Government radioactive waste. The Program, which also encompasses the transportation system and the multipurpose canister system was not the subject of this Report. The subject of this Review was only the Yucca Mountain Project in Nevada. While the Review was directed toward the Yucca Mountain Project rather than the Program as a whole, there are certain elements of the Project which cannot be addressed except through discussion of some Program issues. An example is the Total System Life Cycle Cost addressed in Section 7 of this report. Where Program issues are discussed in this Report, the reader is reminded of the scope limitations of the National Association of Regulatory Utility Commissioners (NARUC) contract to review only the Yucca Mountain Project. The primary scope of the Review was to respond to the specific criteria contained in the NARUC scope of work. In responding to these criteria, the Review Team understood that some interested parties have expressed concern over the requirements of the Nuclear Waste Policy Act relative to the Yucca Mountain Project and the nature of activities currently being carried out by the Department of Energy at the Yucca Mountain Project site. The Review Team has attempted to analyze relevant portions of the Nuclear Waste Policy Act as Amended, but has not conducted a thorough analysis of this legislation that could lead to any specific legal conclusions about all aspects of it.

  10. Introductory materials for committee members: 1) instructions for the Los Alamos National Laboratory fiscal year 2010 capability reviews 2) NPAC strategic capability planning 3) Summary self-assessment for the nuclear and particle physics, astrophysics an

    Energy Technology Data Exchange (ETDEWEB)

    Redondo, Antonio [Los Alamos National Laboratory

    2010-01-01

    Los Alamos National Laboratory (LANL) uses external peer review to measure and continuously improve the quality of its science, technology and engineering (STE). LANL uses capability reviews to assess the STE quality and institutional integration and to advise Laboratory Management on the current and future health of the STE. Capability reviews address the STE integration that LANL uses to meet mission requirements. STE capabilities are define to cut across directorates providing a more holistic view of the STE quality, integration to achieve mission requirements, and mission relevance. The scope of these capabilities necessitate that there will be significant overlap in technical areas covered by capability reviews (e.g., materials research and weapons science and engineering). In addition, LANL staff may be reviewed in different capability reviews because of their varied assignments and expertise. LANL plans to perform a complete review of the Laboratory's STE capabilities (hence staff) in a three-year cycle. The principal product of an external review is a report that includes the review committee's assessments, commendations, and recommendations for STE. The Capability Review Committees serve a dual role of providing assessment of the Laboratory's technical contributions and integration towards its missions and providing advice to Laboratory Management. The assessments and advice are documented in reports prepared by the Capability Review Committees that are delivered to the Director and to the Principal Associate Director for Science, Technology and Engineering (PADSTE). This report will be used by Laboratory Management for STE assessment and planning. The report is also provided to the Department of Energy (DOE) as part of LANL's Annual Performance Plan and to the Los Alamos National Security (LANS) LLC's Science and Technology Committee (STC) as part of its responsibilities to the LANS Board of Governors.

  11. UP1 decommissioning project: initial review of lessons learned

    International Nuclear Information System (INIS)

    Fontana, Ph.; Fraize, G.; Seurat, Ph.

    2008-01-01

    The very first French electricity-generating nuclear reactors (3 gas-graphite reactors operated between 1956 and 1984) and spent fuel reprocessing plant (UP1 and ancillary facilities operated from 1958 to 1997) were located at Marcoule, in southern France. These historic facilities, together with the research labs that contributed to the development and commissioning of the processes implemented, are being decontaminated and dismantled. Other facilities near these nuclear plants will also be shut down in the next few years: the Phenix fast breeder reactor, the Celestin reactors and other ancillary units. Because the UP1 reprocessing plant and its related facilities were used for both commercial and defense activities, a dedicated group comprising three state-owned or private companies (CEA, EdF and COGEMA) was set up as the contracting authority from 1996 to 2004. Today the CEA is the contracting authority at Marcoule and has replaced AREVA NC as the site nuclear operator. AREVA acts as prime contractor for both operation of the main facilities and engineering of the dismantling projects. (authors)

  12. UP1 decommissioning project: initial review of lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Fontana, Ph.; Fraize, G. [CEA Valrho, Dir. de l' Energie Nucleaire (DEN/DPAD), 30 - Marcoule (France); Seurat, Ph. [AREVA NC, 75 - Paris (France)

    2008-07-01

    The very first French electricity-generating nuclear reactors (3 gas-graphite reactors operated between 1956 and 1984) and spent fuel reprocessing plant (UP1 and ancillary facilities operated from 1958 to 1997) were located at Marcoule, in southern France. These historic facilities, together with the research labs that contributed to the development and commissioning of the processes implemented, are being decontaminated and dismantled. Other facilities near these nuclear plants will also be shut down in the next few years: the Phenix fast breeder reactor, the Celestin reactors and other ancillary units. Because the UP1 reprocessing plant and its related facilities were used for both commercial and defense activities, a dedicated group comprising three state-owned or private companies (CEA, EdF and COGEMA) was set up as the contracting authority from 1996 to 2004. Today the CEA is the contracting authority at Marcoule and has replaced AREVA NC as the site nuclear operator. AREVA acts as prime contractor for both operation of the main facilities and engineering of the dismantling projects. (authors)

  13. Organizing Committee Advisory Committee 187

    Indian Academy of Sciences (India)

    Organizing Committee. V M Datar (Chairman). Bhabha Atomic Research Centre, Mumbai, India. D C Biswas (Convener). Bhabha Atomic Research Centre, Mumbai, India. K Mahata (Secretary). Bhabha Atomic Research Centre, Mumbai, India. Z Ahmed. Bhabha Atomic Research Centre, Mumbai, India. P V Bhagwat.

  14. CORR Guidelines. Preparing and Conducting Review Missions of Construction Project Readiness for Nuclear Power Plants

    International Nuclear Information System (INIS)

    2013-01-01

    The construction readiness review (CORR) mission for nuclear power plant projects has been established with the aim of conducting peer reviews of construction projects related to nuclear power plants. Such a mission provides a detailed assessment of readiness for construction, construction progress, readiness for turnover, as well as recommendations for improvement. Organizations in Member States, such as nuclear utilities, owners, regulators and technical support organizations, can benefit from such reviews. A team of international experts with complementing specialities will conduct the CORR mission. The review is based on appropriate IAEA publications, such as IAEA Safety Standards Series Guides and IAEA Nuclear Energy Series publications, as well as on internationally recognized project and construction management guides. Mission findings are summarized in a mission report, which includes a list of recommendations, suggestions and identified good practices. The review is not intended to be a regulatory inspection or an audit against international codes and standards. Rather, it is a peer review aimed at improving implementation processes and procedures through an exchange of technical experiences and practices at the working level. The mission is applicable at any stage of a nuclear power plant construction project, although two specific phases are targeted: (1) start of construction mission (Phase 1 mission) and (2) an in-progress mission (Phase 2 mission). Missions are initiated when official requests are submitted by Member States through the appropriate IAEA channels

  15. EC6 design features and pre-project licensing review

    Energy Technology Data Exchange (ETDEWEB)

    Yu, S.; Lee, A.G.; Dinh, N.B.; Soulard, M. [CANDU Energy Inc., Mississauga, Ontario, (Canada)

    2013-07-01

    The Enhanced CANDU 6 (EC6) is the new Generation III CANDU reactor design that meets the most up to date Canadian regulatory requirements and customer expectations. Candu Energy Inc. is finalizing development of the EC6 which incorporates the CANDU 6's well-proven features, and adds enhancements that strengthened reactor safety margin and improved operability. The EC6 builds on the proven high performance design and the defence-in-depth features of CANDU 6 units, and has incorporated extensive operational feedback including lessons learned from Fukushima. This paper will provide status of the engineering program including progress on the pre-licensing review of the EC6 design by the Canadian Regulator, CNSC, and will also highlight the design and safety enhancements incorporated in the EC6 product. Safety enhancements to meet safety goals and to improve robustness of systems to respond to design basis accidents and beyond design basis accidents include: new severe accident recovery and heat removal system; improved emergency heat removal system; faster shutoff rods with improved safety margins; mechanical guaranteed shutdown rods; daily load cycling capability; robust containment with containment filter venting system; and improved backed-up electrical supply and cooling services. (author)

  16. 2017 GTO Project review Laboratory Evaluation of EGS Shear Stimulation.

    Energy Technology Data Exchange (ETDEWEB)

    Bauer, Stephen J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-10-01

    The objectives and purpose of this research has been to produce laboratory-based experimental and numerical analyses to provide a physics-based understanding of shear stimulation phenomena (hydroshearing) and its evolution during stimulation. Water was flowed along fractures in hot and stressed fractured rock, to promote slip. The controlled laboratory experiments provide a high resolution/high quality data resource for evaluation of analysis methods developed by DOE to assess EGS “behavior” during this stimulation process. Segments of the experimental program will provide data sets for model input parameters, i.e., material properties, and other segments of the experimental program will represent small scale physical models of an EGS system, which may be modeled. The coupled lab/analysis project has been a study of the response of a fracture in hot, water-saturated fractured rock to shear stress experiencing fluid flow. Under this condition, the fracture experiences a combination of potential pore pressure changes and fracture surface cooling, resulting in slip along the fracture. The laboratory work provides a means to assess the role of “hydroshearing” on permeability enhancement in reservoir stimulation. Using the laboratory experiments and results to define boundary and input/output conditions of pore pressure, thermal stress, fracture shear deformation and fluid flow, and models were developed and simulations completed by the University of Oklahoma team. The analysis methods are ones used on field scale problems. The sophisticated numerical models developed contain parameters present in the field. The analysis results provide insight into the role of fracture slip on permeability enhancement-“hydroshear” is to be obtained. The work will provide valuable input data to evaluate stimulation models, thus helping design effective EGS.

  17. Getting with the times: a narrative review of the literature on group decision making in virtual environments and implications for promotions committees.

    Science.gov (United States)

    Acai, Anita; Sonnadara, Ranil R; O'Neill, Thomas A

    2018-05-24

    Concerns around the time and administrative burden of trainee promotion processes have been reported, making virtual meetings an attractive option for promotions committees in undergraduate and postgraduate medicine. However, whether such meetings can uphold the integrity of decision-making processes has yet to be explored. This narrative review aimed to summarize the literature on decision making in virtual teams, discuss ways to improve the effectiveness of virtual teams, and explore their implications for practice. In August 2017, the Web of Science platform was searched with the terms 'decision making' AND 'virtual teams' for articles published within the last 20 years. The search yielded 336 articles, which was narrowed down to a final set of 188 articles. A subset of these, subjectively deemed to be of high-quality and relevant to the work of promotions committees, was included in this review. Virtual team functioning was explored with respect to team composition and development, idea generation and selection, group memory, and communication. While virtual teams were found to potentially offer a number of key benefits over face-to-face meetings including convenience and scheduling flexibility, inclusion of members at remote sites, and enhanced idea generation and external storage, these benefits must be carefully weighed against potential challenges involving planning and coordination, integration of perspectives, and relational conflict among members, all of which can potentially reduce decision-making quality. Avenues to address these issues and maximize the outcomes of virtual promotions meetings are offered in light of the evidence.

  18. [The Editorial Advisory Committee].

    Science.gov (United States)

    Reyes, H

    1996-12-01

    Since 1970, Revista Médica de Chile applies the peer review system as a main step in the selection and improvement of the manuscripts to be published. Over 150 experts participate in this process annually, reviewing up to 5 manuscripts per year. The final decision with regards to to the acceptability of a manuscript remains a responsibility of the Editor. The reviewers are selected by the Editor and his Associates among clinical investigators, prominent subspecialits and basic scientists, according to the nature of the manuscript. Most of them work in Chile. Their names are published and their confidential work is acknowledged in a special chronicle published in the Revista once a year. A small number of these reviewers appears in every issue of the journal identified as Members of its Editorial Advisory Committee. They have been selected by the Editors among those reviewers who deal with a greater number of manuscripts and also those experienced specialists whose opinion is requested when an exceptional conflict of opinions is raised by the authors and their reviewers. After 5 to 10 years of a highly praised collaboration, the previous Committee has been changed and new names were included, starting in this issue of Revista Médica de Chile.

  19. 75 FR 4108 - Sunshine Act Meeting Notice; Board of Directors and Five Committees of the Board

    Science.gov (United States)

    2010-01-26

    ... Part 1622 to remove from its requirements the Board's Governance & Performance Review Committee when it.... Audit Committee 11 a.m. 2. Governance & Performance Review Committee. 3. Provision for the Delivery of.... Governance and Performance Review Committee Agenda 1. Approval of Agenda. 2. Approval of Minutes of the...

  20. ITER management advisory committee meeting

    International Nuclear Information System (INIS)

    Yoshikawa, M.

    2001-01-01

    The ITER Management Advisory Committee (MAC) Meeting was held in Vienna on 16 July 2001. It was the last MAC Meeting and the main topics were consideration of the report by the Director on the ITER EDA status, review of the Work Programme, review of the Joint Fund and arrangements for termination and wind-up of the EDA

  1. 77 FR 61009 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2012-10-05

    ... Committee: Center for Scientific Review Special Emphasis Panel; Program Project: Prenatal Stress and Child..., [email protected] . (Catalogue of Federal Domestic Assistance Program Nos. 93.306, Comparative Medicine...

  2. 78 FR 36553 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2013-06-18

    ...: Revision applications for research on assessing the role of Stigma in HIV prevention and care. Date: [email protected] . Name of Committee: Center for Scientific Review Special Emphasis Panel; Program Project...

  3. Rethinking project management: A structured literature review with a critical look at the brave new world

    DEFF Research Database (Denmark)

    Svejvig, Per; Andersen, Peter

    2015-01-01

    This paper presents the results of a structured review of the rethinking project management (RPM) literature based on the classification and analysis of 74 contributions and in addition takes a critical look at this brave new world. Through the analysis, a total of 6 overarching categories emerged......: contextualization, social and political aspects, rethinking practice, complexity and uncertainty, actuality of projects and broader conceptualization. These categories cover a broad range of different contributions with diverse and alternative perspectives on project management. The early RPM literature dates back...

  4. Review of induced seismic hazard for Hot Dry Rock Project, Rosemanowes, Cornwall

    International Nuclear Information System (INIS)

    Skipp, B.O.; Woo, G.; Eldred, P.J.L.

    1991-01-01

    Geothermal energy installations perturb the earth's crust and so may provoke earthquakes. The 21st Dry Rock (HDR) Geothermal Project at Rosemanowes Quarry in Cornwall has given rise to low level unfelt acoustic emission and possibly small, felt earthquakes. This review of induced seismic hazard study examines the effects that the HDR Project could have on seismic events. Events which are modified by the project, in magnitude and time of occurrence, as well as those which might not have occurred at all were studied. From an examination of the literature and relevant seismicity models, a broad estimate of induced seismic hazard was established. (U.K)

  5. A cost benefit review of applying quality assurance principles to project management of environmental cleanup programs

    International Nuclear Information System (INIS)

    Oakes, T.W.

    1989-01-01

    This paper shows the cost/benefit mechanism used for applying the theory and practical aspects of QA principles as a management tool to project management of environmental cleanup projects. This includes reviewing and guidelines and requirements to determine the practical aspects of applying these requirements to environmental project management. Thus, there is a feedback loop for comparison of the cost/benefits of application of each stage of the project. The project's major stages include planning, environmental sampling, analysis of data samples, data/information management to include reporting, and follow- up, post-cleanup sampling with continued data management. A comparison is also made of the theory with the practical aspects of each of these stages

  6. Breckinridge Project, initial effort. Report XI, Volume V. Critical review of the design basis. [Critical review

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    Report XI, Technical Audit, is a compendium of research material used during the Initial Effort in making engineering comparisons and decisions. Volumes 4 and 5 of Report XI present those studies which provide a Critical Review of the Design Basis. The Critical Review Report, prepared by Intercontinental Econergy Associates, Inc., summarizes findings from an extensive review of the data base for the H-Coal process design. Volume 4 presents this review and assessment, and includes supporting material; specifically, Design Data Tabulation (Appendix A), Process Flow Sheets (Appendix B), and References (Appendix C). Volume 5 is a continuation of the references of Appendix C. Studies of a proprietary nature are noted and referenced, but are not included in these volumes. They are included in the Limited Access versions of these reports and may be reviewed by properly cleared personnel in the offices of Ashland Synthetic Fuels, Inc.

  7. Columbia Basin Fish and Wildlife Authority Project Abstracts; May 25-27, Portland, Oregon, 1997 Annual Review.

    Energy Technology Data Exchange (ETDEWEB)

    Allee, Brian J. (Columbia Basin Fish and Wildlife Authority, Portland, OR)

    1997-06-26

    Abstracts are presented from the 1997 Columbia Basin Fish and Wildlife Program Review of Projects. The purpose was to provide information and education on the approximate 127 million dollars in Northwest electric ratepayer fish and wildlife mitigation projects funded annually.

  8. Standing Concertation Committee

    CERN Multimedia

    HR Department

    2009-01-01

    Ordinary Meeting on 11 May 2009 The meeting of the Standing Concertation Committee held on 11 May 2009 was entirely dedicated to the preparation of the TREF meeting on 19 & 20 May 2009. The Committee took note, discussed and agreed on some clarifications on a number of documents and presentations that the Management planned to submit and/or present to TREF on the following subjects: • Personnel statistics 2008: J. Purvis presented the Personnel Statistics for 2008 prepared by HR Department. In line with the previous year, key messages were firstly, a general reduction in staff (2544 to 2400, - 6%), secondly, a reduction in administrative services personnel (from 422 to 387, - 8%) and thirdly, a marked increase in the number of Users and Unpaid Associates (from 8369 to 9140, + 9%) • Five-Yearly Review 2010: A series of draft documents were submitted for discussion, comprising an introductory document explaining the statutory basis for the following four document...

  9. [Project for the Creation of a Medical or Hospital Ethical Committee at a Local Level in the San Miguel Arcangel Hospital, District of San Miguelito, Province of Panama. Year 2013].

    Science.gov (United States)

    Díaz Rivera, Yashiro A

    2015-01-01

    The next project was based on the design on the creation of a medical ethical Committee at a hospital. It was developed at the San Miguel Arcangel Hospital, District of San Miguelito, Province of Panama, in 2013. Insomuch as the creation of social projects requires unified international parameters, format is taken from the Unesco's guides for the establishing and working of bioethics committees; adapted to the socio-economic, political and cultural context of the San Miguelito District, Panama Province. Furthermore to adapting to socio-ecological aspect where the research project is carried out, the theoretical aspect includes from the ontological personalistic bioethics, where the cornerstone is the dignity of the human person. A study of perceptions of medical staff and nursing was developed on the management of the most common ethical dilemmas in the Hospital San Miguel Arcángel. The instrument used was a previously validated perception survey through a pilot test. Reliability was measured using Cronbach's alpha coefficient, and validity was obtained from the content. Satisfactory statistical results, that verify the working hypotheses on the recognition of the importance of autonomy, confidentiality, protection of vulnerable population, occupational health staff welfare and integration of bioethics at the institutional agenda, were obtained. However, there were particular aspects that indicate some doubt as to the management of some realities that are presented in the context of health care.

  10. A desk evaluation review of project MYA/6/015 hormonal studies on pituitary adrenal disorders. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    Snake-bite is one of the high priority health problems in Myanmar, causing high mortality and mobility rates among the rural population. In 1982 the Department of Medical Research (DMR) of the Ministry of Health launched a research programme for the comprehensive studies of snake (Russell's viper) bites and since then various research divisions of the DMR have been actively engaged in both basic and clinical studies aimed at obtaining adequate knowledge of the biochemical, clinical and pathophysiological mechanisms to guide rational management of snake-bite cases. Also, a clinical research unit has been established in a particular area where the incidence of Russell's viper bite is quite high. Project MYA/6/015 was initiated in 1989 with the objective of determining the incidence, facilitating early diagnosis and assessing the value of therapy in hypopituitarism following snake bite, through the measurements of pituitary and adreno-cortical hormones in serum and their changes in response to dynamic tests. The project was completed in July 1993. The review was undertaken upon request by the Asia and Pacific Section, to assess the overall performance of the project

  11. A desk evaluation review of project MYA/6/015 hormonal studies on pituitary adrenal disorders. Project desk evaluation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-09

    Snake-bite is one of the high priority health problems in Myanmar, causing high mortality and mobility rates among the rural population. In 1982 the Department of Medical Research (DMR) of the Ministry of Health launched a research programme for the comprehensive studies of snake (Russell`s viper) bites and since then various research divisions of the DMR have been actively engaged in both basic and clinical studies aimed at obtaining adequate knowledge of the biochemical, clinical and pathophysiological mechanisms to guide rational management of snake-bite cases. Also, a clinical research unit has been established in a particular area where the incidence of Russell`s viper bite is quite high. Project MYA/6/015 was initiated in 1989 with the objective of determining the incidence, facilitating early diagnosis and assessing the value of therapy in hypopituitarism following snake bite, through the measurements of pituitary and adreno-cortical hormones in serum and their changes in response to dynamic tests. The project was completed in July 1993. The review was undertaken upon request by the Asia and Pacific Section, to assess the overall performance of the project.

  12. Summary of literature review of risk communication: Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Byram, S.J.

    1991-05-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project will estimate radiation exposures people may have received from radioactive materials released during past operations at the Department of Energy's Hanford Site near Richland, Washington. The project is being conducted by Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The Centers for Disease Control (CDC) will use HEDR dose estimates in studies to investigate a potential link between thyroid disease and historical Hanford emissions. The HEDR Project was initiated to address public concerns about the possible health impacts from past releases of radioactive materials from Hanford. The TSP recognized early in the project that special mechanisms would be required to communicate effectively to the many different concerned audiences. To identify and develop these mechanisms, the TSP issued Directive 89-7 to PNL in May 1989. The TSP directed PNL to examine methods to communicate the causes and effects of uncertainties in the dose estimates. A literature review was conducted as the first activity in response to the TSP's directive. This report presents the results of the literature review. The objective of the literature review was to identify ''key principles'' that could be applied to develop communications strategies for the project. 26 refs., 6 figs

  13. Discourses and Theoretical Assumptions in IT Project Portfolio Management: A Review of the Literature

    DEFF Research Database (Denmark)

    Hansen, Lars Kristian

    2014-01-01

    These years increasing interest is put on IT project portfolio management (IT PPM). Considering IT PPM an interdisciplinary practice, this paper conducts a concept-based literature review of relevant articles across various research disciplines. It finds and classifies a stock of 107 relevant...

  14. Phase V storage (Project W-112) Central Waste Complex operational readiness review, final report

    International Nuclear Information System (INIS)

    Wight, R.H.

    1997-01-01

    This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included

  15. Solar Pilot Plant project review No. 9, May 4--5, 1977. CDRL item 10

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-01-01

    Drawings and illustrations for the project review are presented. These are included for the 10 MW(e) solar pilot plant, the collector subsystem, the receiver subsystem, the electrical power generation system and balance of plant, plant controls and transient analysis, availability and safety, pilot and commercial plant designs, and summary and recommendations. (MHR)

  16. 4MOST: the 4-metre Multi-Object Spectroscopic Telescope project at preliminary design review

    NARCIS (Netherlands)

    de Jong, Roelof S.; Barden, Samuel C.; Bellido-Tirado, Olga; Brynnel, Joar G.; Frey, Steffen; Giannone, Domenico; Haynes, Roger; Johl, Diana; Phillips, Daniel; Schnurr, Olivier; Walcher, Jakob C.; Winkler, Roland; Ansorge, Wolfgang R.; Feltzing, Sofia; McMahon, Richard G.; Baker, Gabriella; Caillier, Patrick; Dwelly, Tom; Gaessler, Wolfgang; Iwert, Olaf; Mandel, Holger G.; Piskunov, Nikolai A.; Pragt, Johan H.; Walton, Nicholas A.; Bensby, Thomas; Bergemann, Maria; Chiappini, Cristina; Christlieb, Norbert; Cioni, Maria-Rosa L.; Driver, Simon; Finoguenov, Alexis; Helmi, Amina; Irwin, Michael J.; Kitaura, Francisco-Shu; Kneib, Jean-Paul; Liske, Jochen; Merloni, Andrea; Minchev, Ivan; Richard, Johan; Starkenburg, Else

    2016-01-01

    We present an overview of the 4MOST project at the Preliminary Design Review. 4MOST is a major new wide-field, high-multiplex spectroscopic survey facility under development for the VISTA telescope of ESO. 4MOST has a broad range of science goals ranging from Galactic Archaeology and stellar physics

  17. Discourses and Theoretical Assumptions in IT Project Portfolio Management: A Review of the Literature (reprint)

    DEFF Research Database (Denmark)

    Hansen, Lars Kristian

    2016-01-01

    These years increasing interest is put on IT project portfolio management (IT PPM). Considering IT PPM an interdisciplinary practice, this paper conducts a concept-based literature review of relevant articles across various research disciplines. It finds and classifies a stock of 107 relevant...

  18. Review projects for the US Fusion Program: Progress report, December 1, 1984-February 28, 1987

    International Nuclear Information System (INIS)

    Ribe, F.L.

    1988-01-01

    This paper reviews projects at the University of Washington on the following topics: Magnetic Fusion Energy Program Plan (Feb. 1985); High Density Power Systems; Fusion Systems Studies; Burning Plasmas and Compact Ignition Tokamak; US Magnetic Mirror Program; and Technical Planning Activity (Jan. 1987)

  19. Phase 5 storage (Project W-112) Central Waste Complex operational readiness review, final report

    Energy Technology Data Exchange (ETDEWEB)

    Wight, R.H.

    1997-05-30

    This document is the final report for the RFSH conducted, Contractor Operational Readiness Review (ORR) for the Central Waste Complex (CWC) Project W-112 and Interim Safety Basis implementation. As appendices, all findings, observations, lines of inquiry and the implementation plan are included.

  20. 77 FR 58111 - Notice of Submission for OMB Review; Institute of Education Sciences; FAFSA Completion Project...

    Science.gov (United States)

    2012-09-19

    ... DEPARTMENT OF EDUCATION Notice of Submission for OMB Review; Institute of Education Sciences; FAFSA Completion Project Evaluation SUMMARY: The Institute of Education Sciences (IES) at the U.S. Department of Education (ED) is conducting a rigorous study of the Free Application for Federal Student Aid...

  1. Pep-up: A review of the Umgeni Valley Project evaulation process ...

    African Journals Online (AJOL)

    Pep-up: A review of the Umgeni Valley Project evaulation process. Tim Wright. Abstract. No Abstract. Full Text: EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT · Creative Commons License This work is licensed under a Creative Commons Attribution 3.0 License.

  2. Report of the committee to review the use of J-13 well water in Nevada Nuclear Waste Storage Investigations

    International Nuclear Information System (INIS)

    Harrar, J.E.; Carley, J.F.; Isherwood, W.F.; Raber, E.

    1990-01-01

    The Waste Management Project Office of the Department of Energy conducted a special audit of the activities of the Nevada Nuclear Waste Storage Investigation Project at Livermore. It was noted that there never has been a comprehensive, well-documented examination of the basis for the use of J-13 water in the nuclear waste storage investigations. In each of the sections of This Report, an issue relating to the use of J-13 water has been addressed. 58 refs., 19 figs., 8 tabs

  3. Physics Projects for a Future CERN-LNGS Neutrino Programme

    OpenAIRE

    Picchi, P.; Pietropaolo, F.

    1998-01-01

    We present an overview of the future projects concerning the neutrino oscillation physics in Europe. Recently a joint CERN-LNGS scientific committee has reviewed several proposals both for the study of atmospheric neutrinos and for long (LBL) and short baseline (SBL) neutrino oscillation experiments. The committee has indicated the priority that the European high energy physics community should follows in the field of neutrino physics, namely a new massive, atmospheric neutrino detector and a...

  4. Independent technical review of the Sandia National Laboratories Environmental Restoration Project

    International Nuclear Information System (INIS)

    1994-11-01

    An Independent Technical Review was conducted of the Environmental Restoration Project. The objective of the review was recommendations, from a commercial perspective, on a systems level path forward to safe, minimum cost and schedule project completion. The work presented represents the consensus analysis and recommendations of thirteen individuals with varied backgrounds, expertise, and experience. The ITR team recommends that the barriers to the opportunity described in the diagnosis be eliminated using an integrated DOE-Sandia system approach. Piecemeal changes will not result in the desired commercial efficiency. DOE needs to operate as the contracting agency for a Major System Acquisition. If it does not, commercial performance will not be achieved regardless of the contractor. Likewise, Sandia needs to establish and implement the necessary project structure and management systems to operate with commercial contractor like efficiency

  5. Projecting Future Heat-Related Mortality under Climate Change Scenarios: A Systematic Review

    Science.gov (United States)

    Barnett, Adrian Gerard; Wang, Xiaoming; Vaneckova, Pavla; FitzGerald, Gerard; Tong, Shilu

    2011-01-01

    Background: Heat-related mortality is a matter of great public health concern, especially in the light of climate change. Although many studies have found associations between high temperatures and mortality, more research is needed to project the future impacts of climate change on heat-related mortality. Objectives: We conducted a systematic review of research and methods for projecting future heat-related mortality under climate change scenarios. Data sources and extraction: A literature search was conducted in August 2010, using the electronic databases PubMed, Scopus, ScienceDirect, ProQuest, and Web of Science. The search was limited to peer-reviewed journal articles published in English from January 1980 through July 2010. Data synthesis: Fourteen studies fulfilled the inclusion criteria. Most projections showed that climate change would result in a substantial increase in heat-related mortality. Projecting heat-related mortality requires understanding historical temperature–mortality relationships and considering the future changes in climate, population, and acclimatization. Further research is needed to provide a stronger theoretical framework for projections, including a better understanding of socioeconomic development, adaptation strategies, land-use patterns, air pollution, and mortality displacement. Conclusions: Scenario-based projection research will meaningfully contribute to assessing and managing the potential impacts of climate change on heat-related mortality. PMID:21816703

  6. Annual review of selected scientific literature: Report of the committee on scientific investigation of the American Academy of Restorative Dentistry.

    Science.gov (United States)

    Donovan, Terence E; Marzola, Riccardo; Murphy, Kevin R; Cagna, David R; Eichmiller, Frederick; McKee, James R; Metz, James E; Albouy, Jean-Pierre

    2016-11-01

    It is clear the contemporary dentist is confronted with a blizzard of information regarding materials and techniques from journal articles, advertisements, newsletters, the internet, and continuing education events. While some of that information is sound and helpful, much of it is misleading at best. This review identifies and discusses the most important scientific findings regarding outcomes of dental treatment to assist the practitioner in making evidence-based choices. This review was conducted to assist the busy dentist in keeping abreast of the latest scientific information regarding the clinical practice of dentistry. Each of the authors, who are considered experts in their disciplines, was asked to peruse the scientific literature published in 2015 in their discipline and review the articles for important information that may have an impact on treatment decisions. Comments on experimental methodology, statistical evaluation, and overall validity of the conclusions are included in many of the reviews. The reviews are not meant to stand alone but are intended to inform the interested reader about what has been discovered in the past year. The readers are then invited to go to the source if they wish more detail. Analysis of the scientific literature published in 2015 is divided into 7 sections, dental materials, periodontics, prosthodontics, occlusion and temporomandibular disorders, sleep-disordered breathing, cariology, and implant dentistry. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  7. Technical committee on review of national programmes on fast reactors and accelerator driven systems (ADS). Working material

    International Nuclear Information System (INIS)

    2001-01-01

    The objectives of the meeting were: to exchange information on the national programmes on fast reactors (FR) and accelerator driven systems (ADS); to review the progress since the previous IWG-FR meeting, including the status of the actions; to consider meeting arrangements for 2001 and 2002; to review the Agency co-ordinated research activities in the field of FR and ADS, as well as so-ordination of the TWG-FR activities with their organisations. This report covers the reports presented on the relevant activities in Brazil, China, France, Germany, India, Italy, Japan, Kazakhstan, Republic of Korea, Russia, Sweden, United Kingdom and USA

  8. Economic Evaluation Methodology Review on KAERI's Recent Projects

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Jin Sam; Kim, Jee Young [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2012-05-15

    In technology utilization, economics evaluation is helpful to R and D program managers by giving them economic information needed to improve the usefulness of their projects. Moreover it can help them to communicate to others participants keeping all of them value-oriented minded through the whole development process. In this context, KAERI(Korea Atomic Energy Research Institute) has been performed economic evaluation on recent some projects. So, in this study, it has been made brief reviews on KAERI's economic evaluation methodology to its recent some projects of which evaluation we engage in, especially PEFP(Proton Engineering frontier Project) and SMART(Small Medium advanced ReacTor): Methodology comparison and their pros and cons

  9. A review on disaster risk mitigation in the oil and gas project

    Science.gov (United States)

    Rodhi, N. N.; Anwar, N.; Wiguna, I. P. A.

    2018-01-01

    In addition to the very complex risks, hazards potentially lead to disasters in the oil and gas projects. These risks can certainly be anticipated with the application of risk management, but an unsystematic and ineffective implementation of risk management will still bring adverse impacts. According to the eleven risk management principles in ISO 31000:2009, the application of risk management must pay attention to all aspects, both internal and external factors. Thus, this paper aims to identify variables that could affect the disaster mitigation efforts of oil and gas projects. This research began with literature study to determine the problems of risk management in oil and gas projects, so the affecting variables as the study objectives can be specified subsequently based on the literature review as well. The variables that must be considered in the efforts of disaster risk mitigation of oil and gas project are the risk factors and sustainability aspect.

  10. The Iodine Satellite (iSat) Project Development Towards Critical Design Review (CDR)

    Science.gov (United States)

    Dankanich, John W.; Selby, Michael; Polzin, Kurt A.; Kamhawi, Hani; Hickman, Tyler; Byrne, Larry

    2016-01-01

    Despite the prevalence of Small Satellites in recent years, the systems flown to date have very limited propulsion capability. SmallSats are typically secondary payloads and have significant constraints for volume, mass, and power in addition to limitations on the use of hazardous propellants or stored energy (i.e. high pressure vessels). These constraints limit the options for SmallSat maneuverability. NASA's Space Technology Mission Directorate approved the iodine Satellite flight project for a rapid demonstration of iodine Hall thruster technology in a 12U configuration under the Small Spacecraft Technology Program. The project formally began in FY15 as a partnership between NASA MSFC, NASA GRC, and Busek Co, Inc., with the Air Force supporting the propulsion technology maturation. The team is in final preparation of the Critical Design Review prior to initiating the fabrication and integration phase of the project. The iSat project is on schedule for a launch opportunity in November 2017.

  11. Stake holder involvement in the Canadian review process for uranium production projects in Northern Saskatchewan

    International Nuclear Information System (INIS)

    Underhill, D.

    2004-01-01

    This report describes the Canadian environmental review process for uranium production projects as a case study for the purpose of understanding the nature and value of stakeholder involvement in the management of radiological hazards. While the Canadian review process potentially applies to any development, this case study focuses on the assessment of the uranium projects of northern Saskatchewan conducted during the 1990's. It describes the environmental assessment (EA) conducted in the 1990's for six new uranium facilities (including mines and mills and related tailings disposal sites) planned in northern Saskatchewan. Both the Canadian federal and the Saskatchewan provincial government have extensive environmental review processes that must under law be complete before any major industrial development judged to have potential environmental impacts is undertaken within their respective territories. However, even in those instances where no clear potential environmental impacts are evident, Canadian law mandates 'if public concern about the proposal is such that a public review is desirable, the initiating department shall refer the proposal to the Minister for review by a Panel'. (Wh95) As a stakeholder under law, in both Canada and Saskatchewan, the public plays an important role in the environmental review process. To encourage participation and assist the public in its review the two governments may provide funding (as done in this review) to assist qualified individuals or groups to participant in the review process. The first section of this case study sets the scene. It describes the Saskatchewan uranium mining story, focusing on how the importance of the public stakeholder evolved to become a major component, under law, in the EA process for new uranium mines. This increase in stakeholder involvement opportunities coincided with heightened public concern for the socio-economic impacts of the projects. In the late 1980's both governments were advised by

  12. Cochrane Acute Respiratory Infections Group's Stakeholder Engagement Project identified systematic review priority areas.

    Science.gov (United States)

    Scott, Anna Mae; Clark, Justin; Dooley, Liz; Jones, Ann; Jones, Mark; Del Mar, Chris

    2018-05-22

    Cochrane Acute Respiratory Infections (ARI) Group conducts systematic reviews of the evidence for treatment and prevention of ARIs. We report the results of a prioritisation project, aiming to identify highest priority systematic review topics. The project consisted of 2 Phases. Phase 1 analysed the gap between existing RCTs and Cochrane Systematic Reviews (reported previously). Phase 2 (reported here) consisted of a two-round survey. In round 1, respondents prioritised 68 topics and suggested up to 10 additional topics; in Round 2, respondents prioritised top 25 topics from Round 1. Respondents included clinicians, researchers, systematic reviewers, allied health, patients, and carers, from 33 different countries. In Round 1, 154 respondents identified 20 priority topics, most commonly selecting topics in non-specific ARIs, influenza, and common cold. 50 respondents also collectively suggested 134 additional topics. In Round 2, 78 respondents prioritised top 25 topics, most commonly in the areas of non-specific ARIs, pneumonia and influenza. We generated a list of priority systematic review topics, to guide the Cochrane ARI Group's systematic review work for the next 24 months. Stakeholder involvement enhanced the transparency of the process, and will increase the usability and relevance of the Group's work to stakeholders. Copyright © 2018 Elsevier Inc. All rights reserved.

  13. Resource-constrained project scheduling problem: review of past and recent developments

    Directory of Open Access Journals (Sweden)

    Farhad Habibi

    2018-01-01

    Full Text Available The project scheduling problem is both practically and theoretically of paramount importance. From the practical perspective, improvement of project scheduling as a critical part of project management process can lead to successful project completion and significantly decrease of the relevant costs. From the theoretical perspective, project scheduling is regarded as one of the in-teresting optimization issues, which has attracted the attention of many researchers in the area of operations research. Therefore, the project scheduling issue has been significantly evaluated over time and has been developed from various aspects. In this research, the topics related to Re-source-Constrained Project Scheduling Problem (RCPSP are reviewed, recent developments in this field are evaluated, and the results are presented for future studies. In this regard, first, the standard problem of RCPSP is expressed and related developments are presented from four as-pects of resources, characteristics of activities, type of objective functions, and availability level of information. Following that, details about 216 articles conducted on RCPSP during 1980-2017 are expressed. At the end, in line with the statistics obtained from the evaluation of previ-ous articles, suggestions are made for the future studies in order to help the development of new issues in this area.

  14. Standing Concertation Committee

    CERN Multimedia

    2007-01-01

    Ordinary meeting on 30 January 2007 The main items discussed at the meeting of the Standing Concertation Committee on 30 January 2007 included: Administrative Circular No. 26: with the introduction of the merit recognition system in the framework of the 5-yearly review of CERN employment conditions, Administrative Circular No. 26 has been revised. The committee took note of the revised document which is being finalized for submission to the Director-General for approval in the near future. Technical analysis of CERN Health Insurance Scheme: the Committee was informed that a group has been set up by the Director-General to analyse the financial situation of the CERN Health Insurance Scheme in the short and long term, and to propose measures to ensure that the Scheme remains in financial balance, with adequate cover, over the medium term. The group's terms of reference and membership were communicated. Voluntary programmes It was announced that the programmes: 'part-time work as a pre-retirement measure...

  15. Standing Concertation Committee

    CERN Multimedia

    2007-01-01

    ORDINARY MEETING ON 30 JANUARY 2007 The main items discussed at the meeting of the Standing Concertation Committee on 30 January 2007 included: Administrative Circular No. 26: with the introduction of the merit recognition system in the framework of the 5-yearly review of CERN employment conditions, Administrative Circular No. 26 has been revised. The Committee took note of the revised document which is being finalized for submission to the Director-General for approval in the near future. Technical analysis of CERN Health Insurance Scheme: the Committee was informed that a group has been set up by the Director-General to analyse the financial situation of the CERN Health Insurance Scheme in the short and long term, and to propose measures to ensure that the Scheme remains in financial balance, with adequate cover, over the medium term. The group's terms of reference and membership were communicated. Voluntary programmes It was announced that the programmes: 'part-time work as a pre-retirement mea...

  16. Barriers to Implementing the ACGME Outcome Project: A Systematic Review of Program Director Surveys.

    Science.gov (United States)

    Malik, Mohammad U; Diaz Voss Varela, David A; Stewart, Charles M; Laeeq, Kulsoom; Yenokyan, Gayane; Francis, Howard W; Bhatti, Nasir I

    2012-12-01

    The Accreditation Council for Graduate Medical Education (ACGME) introduced the Outcome Project in July 2001 to improve the quality of resident education through competency-based learning. The purpose of this systematic review is to determine and explore the perceptions of program directors regarding challenges to implementing the ACGME Outcome Project. We used the PubMed and Web of Science databases and bibliographies for English-language articles published between January 1, 2001, and February 17, 2012. Studies were included if they described program directors' opinions on (1) barriers encountered when attempting to implement ACGME competency-based education, and (2) assessment methods that each residency program was using to implement competency-based education. Articles meeting the inclusion criteria were screened by 2 researchers. The grading criterion was created by the authors and used to assess the quality of each study. The survey-based data reported the opinions of 1076 program directors. Barriers that were encountered include: (1) lack of time; (2) lack of faculty support; (3) resistance of residents to the Outcome Project; (4) insufficient funding; (5) perceived low priority for the Outcome Project; (6) inadequate salary incentive; and (7) inadequate knowledge of the competencies. Of the 6 competencies, those pertaining to patient care and medical knowledge received the most responses from program directors and were given highest priority. The reviewed literature revealed that time and financial constraints were the most important barriers encountered when implementing the ACGME Outcome Project.

  17. Key factors of project success in family small and medium-sized companies: the theoretical review

    Directory of Open Access Journals (Sweden)

    Sinisa Arsic

    2017-10-01

    Full Text Available The paper proposes a systematization of the key success factors of projects, through the theoretical review of family-owned companies operating in the EU market. It is the small and medium companies that in their own way contribute to the overall success of the national economy in terms of economic activity, increased employment, development activities and defining better business environment. The theoretical review observed numerous studies of family businesses, and the contribution of this work is in the systematization of the results of previous research – over three horizons, i.e., over the role of managers in the creation of successful projects (or owner if it is a family enterprise, institutional support for companies in Serbia and the EU, specific industries and the parent (regional markets where a family company operates. Project management, as a general representation of the concept of implementation of strategic and operational endeavors, contains many specifics in terms of critical success factors of projects depending on the environment in which they are implemented. The goal of the paper is reflected in the identification and presentation of critical success factors of projects implemented in family companies. The paper concludes with a discussion of the research results in relation to the existing, similar research studies, as well as with the announcement of future research, which will examine the conclusions drawn on a real sample.

  18. ITER technical advisory committee meeting at Garching

    International Nuclear Information System (INIS)

    Fujiwara, M.

    1999-01-01

    The ITER Technical Advisory Committee meeting took place on 24-27 February at the Garching Joint Work Site. According to the discussions at the ITER meeting in Yokohama in October 1998, the Technical Advisory Committee was requested to conduct a thorough review of the document 'Options for the reduced technical objectives / reduced cost ITER'

  19. 75 FR 26918 - Fishlake Resource Advisory Committee

    Science.gov (United States)

    2010-05-13

    ... requirements, brief participants on Payments to States legislative history, discuss the guidelines for Title II... following business will be conducted: (1) Welcome and Committee introductions; (2) Federal Advisory Committee Act overview and powerpoint; (3) review of Payments to States legislative history and discussion...

  20. A systematic review of estrogens for recurrent urinary tract infections: third report of the hormones and urogenital therapy (HUT) committee.

    Science.gov (United States)

    Cardozo, L; Lose, G; McClish, D; Versi, E; de Koning Gans, H

    2001-01-01

    Our objective was to apply a meta-analysis to the available data to evaluate the effect of estrogen supplementation in the prevention of recurrent urinary tract infections in postmenopausal women. The literature review incorporated articles based on a search of Excerpta Medica, Medline, Science Citation Index and a manual search of commonly read journals in the fields of urology, gynecology, gerontology and primary healthcare, from January 1969 to December 1998. The search was not limited to English-language publications. Inclusion criteria were peer-reviewed articles containing original data with a primary outcome of symptomatic urinary tract infections and an estrogen-treated group. Articles were categorized into randomized controlled trials, case-control studies and self-controlled series. Of the articles reviewed, five were randomized controlled trials, two were case-control studies and three were self-control series. Meta-analysis of data from 334 subjects revealed a significant benefit from estrogen over placebo (odds ratio = 2.51, 95% confidence interval = 1.48 4.25). The most convincing results were obtained using the vaginal route of administration. A variety of different estrogen preparations have been employed in the few published reports, making comparison of the data difficult. However, vaginal administration seems to be effective in the prevention of recurrent urinary tract infections in postmenopausal women.

  1. Ethics Review for a Multi-Site Project Involving Tribal Nations in the Northern Plains.

    Science.gov (United States)

    Angal, Jyoti; Petersen, Julie M; Tobacco, Deborah; Elliott, Amy J

    2016-04-01

    Increasingly, Tribal Nations are forming ethics review panels, which function separately from institutional review boards (IRBs). The emergence of strong community representation coincides with a widespread effort supported by the U.S. Department of Health & Human Services and other federal agencies to establish a single IRB for all multi-site research. This article underscores the value of a tribal ethics review board and describes the tribal oversight for the Safe Passage Study-a multi-site, community-based project in the Northern Plains. Our experience demonstrates the benefits of tribal ethics review and makes a strong argument for including tribal oversight in future regulatory guidance for multi-site, community-based research. © The Author(s) 2016.

  2. STANDING CONCERTATION COMMITTEE

    CERN Multimedia

    2003-01-01

    ORDINARY MEETING ON 29 SEPTEMBER 2003 Original: English This meeting was devoted to the main topics summarised below. 1 Follow-up from the meetings of TREF and the Finance Committee in September 2003 The last meeting of TREF had been devoted to presentations and clarifications on the 5-Yearly Review process. The content and planning of the 2005 Review are matters for the next Management, which will be presented to TREF next year. Underlining that due account has to be taken of the limited resources available to conduct such an exercise, the Staff Association stated that it looks forward to the concertation process at the SCC in preparing the next 5-Yearly Review to define an optimum set of topics in order to ensure that CERN can attract, retain and motivate the personnel that it needs to remain a centre of excellence. The Chairman of the SCC recalled that an information document on the Cost-Variation Index for 2004 had been transmitted to the Finance Committee last September and that complete information o...

  3. 76 FR 46279 - Smart Grid Advisory Committee

    Science.gov (United States)

    2011-08-02

    ...The Smart Grid Advisory Committee (SGAC or Committee) will hold a meeting via teleconference on Tuesday, August 23, 2011 from 11 a.m. to 2 p.m. Eastern Time (E.T.). The primary purpose of this meeting is to review sections of the Committee's draft report to the NIST Director. The sections of the draft report that the Committee will consider at the meeting will be posted on the SGAC Web site at http:// www.nist.gov/smartgrid. Interested members of the public will be able to participate in the meeting from remote locations by calling into a central phone number.

  4. 76 FR 12711 - Smart Grid Advisory Committee

    Science.gov (United States)

    2011-03-08

    ...The Smart Grid Advisory Committee (SGAC or Committee), will hold a meeting on Thursday, March 24, 2011 from 8:30 a.m. to 5 p.m. The primary purpose of this meeting is to review the early findings and observations of each Subcommittee, strategize the Table of Contents for the Committee report to NIST, agree on the page limit for each subcommittee, and look for any common overarching themes. There will also be breakouts for each subcommittee to meet individually. The agenda may change to accommodate Committee business. The final agenda will be posted on the Smart Grid Web site at http:// www.nist.gov/smartgrid.

  5. 77 FR 72431 - Shipping Coordinating Committee; Notice of Committee Meeting

    Science.gov (United States)

    2012-12-05

    ... other IMO bodies --Global Maritime Distress and Safety System (GMDSS): --Review and modernization of the... operational and technical coordination provisions of maritime safety information (MSI) services, including the... business --Report to the Maritime Safety Committee Members of the public may attend this meeting up to the...

  6. Design review report: 200 East upgrades for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's 200 East (200E) Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314 is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farm waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first design package (AN Valve Pit Upgrades) was completed in November 1997, and the associated design verification activities are documented in HNF-1893. The second design package, 200 East (200E) Upgrades, was completed in March 1998. This design package identifies modifications to existing valve pits 241-AX-B and 241-A-B, as well as several new waste transfer pipelines to be constructed within the A Farm Complex of the 200E Area. The scope of the valve pit modifications includes new pit cover blocks, valve

  7. Review of the groundwater flow modelling of the Swiss Project Gewaehr

    International Nuclear Information System (INIS)

    Robinson, P.C.; Jackson, C.P.; Herbert, A.W.; Atkinson, R.

    1986-02-01

    The authors review the hydrogeological modelling work undertaken by NAGRA (National Co-operative for the Storage of Radioactive Waste) for Project Gewahr (Guarantee). The FEM301 computer code that was used by NAGRA, their general approach to flow simulation and the specific finite-element models employed are all discussed; and the results of a verification are presented using the authors' own computer code NAMMU. Recommendations for improvements in the NAGRA modelling and for areas of future work are made. (author)

  8. The 1991 DOE/Sandia Crystalline Photovoltaic Technology Project Review Meeting

    Science.gov (United States)

    Whipple, M. L.

    1991-07-01

    This document serves as the proceedings for the manual project review meeting held by Sandia's Photovoltaic Technology Research Division. It contains information supplied by each organization making a presentation at the meeting, which was held July 30 through 31, 1991 at the Sheraton Hotel in Albuquerque, New Mexico. Sessions were held to discuss national photovoltaic programs, one-sun crystalline silicon cell research, concentrator silicon cell research, and concentrating collector development.

  9. The Iodine Satellite (iSat) Project Development Towards Critical Design Review

    Science.gov (United States)

    Dankanich, John W.; Calvert, Derek; Kamhawi, Hani; Hickman, Tyler; Szabo, James; Byrne, Lawrence

    2015-01-01

    Despite the prevalence of small satellites in recent years, the systems flown to date have very limited propulsion capability. SmallSats are typically secondary payloads and have significant constraints for volume, mass, and power in addition to limitations on the use of hazardous propellants or stored energy. These constraints limit the options for SmallSat maneuverability. NASA's Space Technology Mission Directorate approved the iodine Satellite flight project for a rapid demonstration of iodine Hall thruster technology in a 12U (cubesat units) configuration under the Small Spacecraft Technology Program. The mission is a partnership between NASA MSFC, NASA GRC, and Busek Co, Inc., with the Air Force supporting the propulsion technology maturation. The team is working towards the critical design review in the final design and fabrication phase of the project. The current design shows positive technical performance margins in all areas. The iSat project is planned for launch readiness in the spring of 2017.

  10. Clinical research ethics review process in Lebanon: efficiency and functions of research ethics committees - results from a descriptive questionnaire-based study.

    Science.gov (United States)

    Atallah, David; Moubarak, Malak; El Kassis, Nadine; Abboud, Sara

    2018-01-11

    Clinical trials conducted in Lebanon are increasing. However, little is known about the performance of research ethics committees (RECs) in charge of reviewing the research protocols. This study aimed to assess the level of adherence to the ethics surrounding the conduct of clinical trials and perceptions of team members regarding roles of the RECs during the conduct of clinical trials in Lebanon. The research question was: Are RECs adherent to the ethics surrounding the conduct of clinical trials (chapters II and IV in 'Standards and Operational Guidance for Ethics Review of Health-related Research with Human Participants' in Lebanon?' This was a quantitative and descriptive questionnaire-based study conducted among RECs of university hospitals in Lebanon. The questionnaire had to be completed online and included general questions in addition to items reflecting the different aspects of a REC performance and effectiveness. All the questionnaire was assigned a total score of 175 points. General information and questions assigned point values/scores were analysed using descriptive statistics: frequency and percentage, mean score ± standard deviation. Ten RECs participated in the study (52 persons: four chairs, one vice-president, 47 ordinary members). Forty-seven (90.4%) had previous experience with clinical research and 30 (57.7%) had a diploma or had done a training in research ethics. Forty-one percent confirmed that they were required to have a training in research ethics. All RECs had a policy for disclosing and managing potential conflicts of interest for its members, but 71.8% of participants reported the existence of such a policy for researchers. Thirty-three point three percent reported that the RECs had an anti-bribery policy. The questionnaire mean score was 129.6 ± 22.3/175 points reflecting thus an excellent adherence to international standards. Inadequate training of REC members and the lack of anti-bribery policies should be resolved to

  11. Does the committee peer review select the best applicants for funding? An investigation of the selection process for two European molecular biology organization programmes.

    Directory of Open Access Journals (Sweden)

    Lutz Bornmann

    Full Text Available Does peer review fulfill its declared objective of identifying the best science and the best scientists? In order to answer this question we analyzed the Long-Term Fellowship and the Young Investigator programmes of the European Molecular Biology Organization. Both programmes aim to identify and support the best post doctoral fellows and young group leaders in the life sciences. We checked the association between the selection decisions and the scientific performance of the applicants. Our study involved publication and citation data for 668 applicants to the Long-Term Fellowship programme from the year 1998 (130 approved, 538 rejected and 297 applicants to the Young Investigator programme (39 approved and 258 rejected applicants from the years 2001 and 2002. If quantity and impact of research publications are used as a criterion for scientific achievement, the results of (zero-truncated negative binomial models show that the peer review process indeed selects scientists who perform on a higher level than the rejected ones subsequent to application. We determined the extent of errors due to over-estimation (type I errors and under-estimation (type 2 errors of future scientific performance. Our statistical analyses point out that between 26% and 48% of the decisions made to award or reject an application show one of both error types. Even though for a part of the applicants, the selection committee did not correctly estimate the applicant's future performance, the results show a statistically significant association between selection decisions and the applicants' scientific achievements, if quantity and impact of research publications are used as a criterion for scientific achievement.

  12. Review of issues and challenges for public private partnership (PPP) project performance in Malaysia

    Science.gov (United States)

    Hashim, H.; Che-Ani, A. I.; Ismail, K.

    2017-10-01

    Public Private Partnership (PPP) in Malaysia aims to stimulate economic growth and overcome the weakness of conventional system. Over the years, many critics have been reported along the massive growth of PPP project development. Within that context, this study provides a review of issues and challenges for PPP pertaining to project performance in Malaysia. The study also attempts to investigate four performance measurement models around the globe as a basis for improvement of PPP in Malaysia. A qualitative method was used to analyse literature review from previous published literatures while comparative analysis was carried out within the models to identify their advantages and disadvantages. The findings show that the issues and challenges occurred were related to human, technical and financial factor that could hinder the implementation of PPP project in Malaysia. From the analysis, KPIs, guideline / framework, risk allocation, efficiency & flexibility are perceived as dominant issues. Finally, the findings provide an informed basis on the opportunity areas to be considered for improvement in order to achieved project effectiveness.

  13. Saskatchewan external cost review : report prepared by a Joint Oil and Gas Industry - Saskatchewan Energy and Mines Committee

    International Nuclear Information System (INIS)

    Anon.

    1996-11-01

    The external costs associated with the operating phase of oil and gas wells in Saskatchewan, were reviewed. The report identified external costs and compared their competitiveness with those of other producing jurisdictions. The profitability of the oil and gas industry in Saskatchewan was also assessed in an effort to provide industry and government with an informational package for use for discussion purposes. The study showed that (1) the oil and gas industry has been a major force for economic growth within Saskatchewan, (2) the province will continue to face stiff competition from other jurisdictions for new oil and gas investment dollars, (3) the system used for determining and administering external costs vary widely from one jurisdiction to another, and (4) a number of external costs are not sensitive to well production rates or commodity price movements. tabs., figs

  14. Department of Energy Review of Laboratory Programs for Women Points-of-Contact Committee: Comparative Report, June 1995

    Energy Technology Data Exchange (ETDEWEB)

    McLane, V.; Layne, A.

    1995-06-01

    A survey of the DOE facilities was undertaken by the Points-of-Contact for the DOE Review of Laboratory Programs for Women in order to gather data to be used as a baseline against which to measure future progress. We plan to look at current programs already in place and evaluate them with a view to deciding which programs are most effective, and selecting model programs suitable for implementation at other facilities. The survey focused on four areas: 1) statistical data, 2) laboratory policy, 3) formal and informal programs which affect the quality of life in the work environment, and career development and advancement, and 4) educational programs. Although this report focuses on women, the problems discussed affect all DOE facility employees.

  15. Report of a Special Committee on the Review of U.S. Nuclear Power Plant Accident, second report

    International Nuclear Information System (INIS)

    1979-01-01

    Following on the issuance of the first report, for the accident in Three Mile Island Nuclear Power Plant in the United States there has appeared detailed information of such as reactor operation and radiation control. This has enabled technical evaluation of those items involved in nuclear power safety. The review results up to the beginning of September 1979 are presented, to meet popular desires to know the accident situation and to reflect the results in the nation's nuclear power generation. Contents are features and background of the TMI Nuclear Power Plant accident consequences, safety measures to be taken in Japan, and (in the appendix) the data on the TMI accident, countermeasures taken in Japan, etc. (Mori, K.)

  16. 32 CFR 2103.51 - Information Security Oversight Committee.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Information Security Oversight Committee. 2103... BE DECLASSIFIED Implementation and Review § 2103.51 Information Security Oversight Committee. The NCS Information Security Oversight Committee shall be chaired by the Staff Counsel of the National Security...

  17. 32 CFR 2700.51 - Information Security Oversight Committee.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Information Security Oversight Committee. 2700... MICRONESIAN STATUS NEGOTIATIONS SECURITY INFORMATION REGULATIONS Implementation and Review § 2700.51 Information Security Oversight Committee. The OMSN Information Security Oversight Committee shall be chaired...

  18. Ethical issues in research involving minority populations: the process and outcomes of protocol review by the Ethics Committee of the Faculty of Tropical Medicine, Mahidol University, Thailand

    Science.gov (United States)

    2013-01-01

    Background Recruiting minorities into research studies requires special attention, particularly when studies involve “extra-vulnerable” participants with multiple vulnerabilities, e.g., pregnant women, the fetuses/neonates of ethnic minorities, children in refugee camps, or cross-border migrants. This study retrospectively analyzed submissions to the Ethics Committee of the Faculty of Tropical Medicine (FTM-EC) in Thailand. Issues related to the process and outcomes of proposal review, and the main issues for which clarification/revision were requested on studies, are discussed extensively. Methods The study data were extracted from proposals and amendments submitted to the FTM-EC during the period October 2009 – September 2012, and then analyzed qualitatively and quantitatively. The main issues for clarification/revision were analyzed by thematic content analysis. Results 373 proposals were submitted; 44 studies involved minority groups with 21 extra-vulnerable minorities. All clinical and 2/3 of non-clinical studies submitted for initial review underwent full-board review. For combined clinical and non-clinical study submissions, 92.1% were referred back to the investigators and approved after clarification/revision, while 2.7% were deferred due to major/critical changes, and 2.1% not approved due to substantial violations of ethical principles. The main issues needing clarification/revision differed between all studies and those involving minorities: participant information sheet (62.2% vs. 86.4%), informed consent/assent form (51.2% vs. 86.4%), and research methodology (80.7% vs. 84.1%), respectively. The main ethical issues arising during the meetings, regarding studies involving minorities, included ensuring no exploitation, coercion, or pressure on the minority to participate; methodology not affecting their legal status; considering ethnicity and cultural structure; and providing appropriate compensation. Conclusion Delays in the approval or non

  19. The International Science and Technology Center (ISTC) and ISTC projects related to research reactors: information review

    Energy Technology Data Exchange (ETDEWEB)

    Tocheniy, L. V.; Rudneva, V. Ya. [ISTC, Moscow (Russian Federation)

    1998-07-01

    The ISTC is an intergovernmental organization established by agreement between the Russian Federation, the European Union, Japan, and the United States. Since 1994, Finland, Sweden, Norway, Georgia, Belarus, Kazakhstan and the Kyrgyz Republic have acceded to the Agreement and Statute. At present, the Republic of Korea is finishing the process of accession to the ISTC. All work of the ISTC is aimed at the goals defined in the ISTC Agreement: To give CIS weapons scientists, particularly those who possess knowledge and skills related to weapons of mass destruction and their delivery systems, the opportunities to redirect their talents to peaceful activities; To contribute to solving national and international technical problems; To support the transition to market-based economics; To support basic and applied research; To help integrate CIS weapons scientists into the international scientific community. The projects may be funded both through governmental funds of the Funding partners of the ISTC. According to the ISTC Statute, approved by the appropriate national organizations, funds used within ISTC projects are exempt from CIS taxes. As of March 1998, more than 1500 proposals had been submitted to the Center, of which 551 were approved for funding, for a total value of approximately US$166 million. The number of scientists and engineers participating in the projects is more than 18000. There are about 20 funded and as yet nonfunded projects related to various problems of research reactors. Many of them address safety issues. Information review of the results and plans of both ongoing projects and as yet nonfunded proposals related to research reactors will be presented with the aim assisting international researchers to establish partnerships or collaboration with ISTC projects. The following groups of ISTC projects will be represented: 1. complex computer simulator s for research reactors; 2. reactor facility decommissioning; 3. neutron sources for medicine; 4

  20. The development of biodiversity conservation measures in China's hydro projects: A review.

    Science.gov (United States)

    Bai, Ruiqiao; Liu, Xuehua; Liu, Xiaofei; Liu, Lanmei; Wang, Jianping; Liao, Sihui; Zhu, Annah; Li, Zhouyuan

    2017-11-01

    The hydropower capacity of China ranks first in the world and accounts for approximately 20% of the total energy production in the country. While hydropower has substantially contributed to meeting China's renewable energy targets and providing clean energy to rural areas, the development of hydropower in China has been met with significant controversy. Ecologically, hydro projects alter the landscape, with potential impacts to the country's aquatic biodiversity. Over the past four decades in China, various mainstream opinions and misunderstandings have been presented concerning how to alleviate the negative impacts of hydro projects on aquatic ecosystems. This article reviews research concerning potential mitigation measures to enhance aquatic biodiversity conservation in hydro projects in China. Based on the academic attention such research has attracted, three technical measures for aquatic biodiversity conservation are considered: (1) fish passages, (2) restocking efforts and (3) river and lake renovations. This article provides a historical comparison of these three practices in China to demonstrate the advantages and disadvantages of each method. The article also reviews the relevant legislation, regulations and technical guidelines concerning China's hydro projects dating back to 1979. The dynamics in research, publications, and patents concerning these three mitigation measures are summarized to demonstrate their technological developments in the context of legislative and policy advances. Data were gathered through the China Knowledge Resource Integrated Database and the State Intellectual Property Office of the People's Republic of China. Based on the analysis provided, the article recommends an expansion of China's environmental certification system for hydro projects, more robust regional legislation to bolster the national framework, the cooperation between upstream and downstream conservation mechanisms, and better monitoring to determine the efficacy

  1. [Accreditation of Independent Ethics Committees].

    Science.gov (United States)

    Ramiro Avilés, Miguel A

    According to Law 14/2007 and Royal Decree 1090/2015, biomedical research must be assessed by an Research Ethics Committee (REC), which must be accredited as an Research ethics committee for clinical trials involving medicinal products (RECm) if the opinion is issued for a clinical trial involving medicinal products or clinical research with medical devices. The aim of this study is to ascertain how IEC and IECm accreditation is regulated. National and regional legislation governing biomedical research was analysed. No clearly-defined IEC or IECm accreditation procedures exist in the national or regional legislation. Independent Ethics Committees are vital for the development of basic or clinical biomedical research, and they must be accredited by an external body in order to safeguard their independence, multidisciplinary composition and review procedures. Copyright © 2016 SESPAS. Publicado por Elsevier España, S.L.U. All rights reserved.

  2. Focal relationships and the environment of project marketing. A literature review with suggestions for practitioners and future research

    DEFF Research Database (Denmark)

    Skaates, Maria Anne; Tikkanen, Henrikki

    2000-01-01

    of the review is upon the connection between focal relationships and the wider environment in which project marketing and systems selling takes place. First, several common definitions of projects and project marketing are presented and discussed. Second, the implications of three specific features of project......Project marketing is an important mode of business-to-business marketing today. This paper assesses recent project marketing contributions, including predominantly those of members of the (mainly European) International Network for Project Marketing and Systems Selling (INPM). The emphasis...... business - discontinuity, uniqueness, and complexity - for the focal relationship and the broader marketing environment are considered at the level of multiple projects. Third, three overlapping types of postures that project-selling firms can adopt in relation to their focal relationships...

  3. Supplementation of infant formula with probiotics and/or prebiotics: a systematic review and comment by the ESPGHAN committee on nutrition

    NARCIS (Netherlands)

    Braegger, Christian; Chmielewska, Anna; Decsi, Tamas; Kolacek, Sanja; Mihatsch, Walter; Moreno, Luis; Pieścik, Małgorzata; Puntis, John; Shamir, Raanan; Szajewska, Hania; Turck, Dominique; van Goudoever, Johannes

    2011-01-01

    Infant formulae are increasingly supplemented with probiotics, prebiotics, or synbiotics despite uncertainties regarding their efficacy. The present article, developed by the Committee on Nutrition of the European Society for Paediatric Gastroenterology, Hepatology, and Nutrition, systematically

  4. Activities of the research committee

    Energy Technology Data Exchange (ETDEWEB)

    Hasegawa, A.; Shirai, T.; Nakagawa, M.; Osugi, T.; Ikeda, Y.; Ishida, T.; Shimazaki, J. [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    2000-01-01

    The department of Nuclear Energy System serves as a secretarial of the following four research committees organized by JAERI; Japanese Nuclear Data Committee, Atomic and Molecular Data Research Committee, Research Committee on Reactor Physics and Research Committee on Marine Reactors. The purpose and the expected task of each committee are summarized here. The detailed activities of each committee are presented in this paper. (author)

  5. A review of risk management process in construction projects of developing countries

    Science.gov (United States)

    Bahamid, R. A.; Doh, S. I.

    2017-11-01

    In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.

  6. Athens automation and control experiment project review meeting, Dallas, Texas, December 5-6, 1984

    Energy Technology Data Exchange (ETDEWEB)

    Detwiler, J.S.; Hu, P.S.; Lawler, J.S.; Markel, L.C.; McIntyre, J.M.; McKinley, K.F.; Monteen, L.D.; Purucker, S.L.; Reed, J.H.; Rizy, D.T.

    1985-12-01

    The AACE is an electric power distribution automation project involving research and development of both hardware and software. Equipment for the project is being installed on the electric distribution system of the Athens Utilities Board (AUB), located in Athens, Tennessee. Purposes of the AACE are to develop and test load control, volt/var control, and system reconfiguration capabilities on an electric distribution system and to transfer what is learned to the electric utility industry. Expected benefits include deferral of costly power generation plants and increased electric service reliability. A project review meeting was held to review the progress of the AACE and to communicate the objectives and experimental plans to the electric utility industry. At the time of the meeting, the experimental test plans were being written; much of the AACE field equipment had been received by AUB, and installation had begun. A computer system, the AACE Test System (AACETS), was already operational at ORNL. AACETS will be used to develop and test applications software and experimental control strategies prior to their implementation on the AUB system. The AACE experiments are scheduled to begin in October 1985 and to continue through October 1987.

  7. Fusion Policy Advisory Committee (FPAC)

    International Nuclear Information System (INIS)

    1990-09-01

    This document is the final report of the Fusion Policy Advisory Committee. The report conveys the Committee's views on the matters specified by the Secretary in his charge and subsequent letters to the Committee, and also satisfies the provisions of Section 7 of the Magnetic Fusion Energy Engineering Act of 1980, Public Law 96-386, which require a triennial review of the conduct of the national Magnetic Fusion Energy program. Three sub-Committee's were established to address the large number of topics associated with fusion research and development. One considered magnetic fusion energy, a second considered inertial fusion energy, and the third considered issues common to both. For many reasons, the promise of nuclear fusion as a safe, environmentally benign, and affordable source of energy is bright. At the present state of knowledge, however, it is uncertain that this promise will become reality. Only a vigorous, well planned and well executed program of research and development will yield the needed information. The Committee recommends that the US commit to a plan that will resolve this critically important issue. It also outlines the first steps in a development process that will lead to a fusion Demonstration Power Plant by 2025. The recommended program is aggressive, but we believe the goal is reasonable and attainable. International collaboration at a significant level is an important element in the plan

  8. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  9. Reviews on current carbon emission reduction technologies and projects and their feasibilities on ships

    Science.gov (United States)

    Wang, Haibin; Zhou, Peilin; Wang, Zhongcheng

    2017-06-01

    Concern about global climate change is growing, and many projects and researchers are committed to reducing greenhouse gases from all possible sources. International Maritime (IMO) has set a target of 20% CO2 reduction from shipping by 2020 and also presented a series of carbon emission reduction methods, which are known as Energy Efficiency Design Index (EEDI) and Energy Efficiency Operation Indicator (EEOI). Reviews on carbon emission reduction from all industries indicate that, Carbon Capture and Storage (CCS) is an excellent solution to global warming. In this paper, a comprehensive literature review of EEDI and EEOI and CCS is conducted and involves reviewing current policies, introducing common technologies, and considering their feasibilities for marine activities, mainly shipping. Current projects are also presented in this paper, thereby illustrating that carbon emission reduction has been the subject of attention from all over the world. Two case ship studies indicate the economic feasibility of carbon emission reduction and provide a guide for CCS system application and practical installation on ships.

  10. Systematic Review Methodology for the Fatigue in Emergency Medical Services Project.

    Science.gov (United States)

    Patterson, P Daniel; Higgins, J Stephen; Weiss, Patricia M; Lang, Eddy; Martin-Gill, Christian

    2018-02-15

    Guidance for managing fatigue in the Emergency Medical Services (EMS) setting is limited. The Fatigue in EMS Project sought to complete multiple systematic reviews guided by seven explicit research questions, assemble the best available evidence, and rate the quality of that evidence for purposes of producing an Evidence Based Guideline (EBG) for fatigue risk management in EMS operations. We completed seven systematic reviews that involved searches of six databases for literature relevant to seven research questions. These questions were developed a priori by an expert panel and framed in the Population, Intervention, Comparison, and Outcome (PICO) format and pre-registered with PROSPERO. Our target population was defined as persons 18 years of age and older classified as EMS personnel or similar shift worker groups. A panel of experts selected outcomes for each PICO question as prescribed by the Grading of Recommendations, Assessment, Development, and Evaluation (GRADE) methodology. We pooled findings, stratified by study design (experimental vs. observational) and presented results of each systematic review in narrative and quantitative form. We used meta-analyses of select outcomes to generate pooled effects. We used the GRADE methodology and the GRADEpro software to designate a quality of evidence rating for each outcome. We present the results for each systematic review in accordance with the Preferred Reporting Items for Systematic reviews and Meta-Analyses (PRISMA). More than 38,000 records were screened across seven systematic reviews. The median, minimum, and maximum inter-rater agreements (Kappa) between screeners for our seven systematic reviews were 0.66, 0.49, and 0.88, respectively. The median, minimum, and maximum number of records retained for the seven systematic reviews was 13, 1, and 100, respectively. We present key findings in GRADE Evidence Profile Tables in separate publications for each systematic review. We describe a protocol for

  11. Independent technical reviews for groundwater and soil remediation projects at US Department Of Energy sites - 59188

    International Nuclear Information System (INIS)

    Kaback, Dawn S.; Chamberlain, Grover; Morse, John G.; Petersen, Scott W.

    2012-01-01

    The US Department of Energy Office of Environmental Management has supported independent technical reviews of soil and groundwater projects at multiple DOE sites over the last 10 years. These reviews have resulted in significant design improvements to remedial plans that have accelerated cleanup and site closure. Many have also resulted in improved understanding of complex subsurface conditions, promoting better approaches to design and implementation of new technologies. Independent technical reviews add value, because they provide another perspective to problem solving and act as a check for especially challenging problems. By bringing in a team of independent experts with a broad experience base, alternative solutions are recommended for consideration and evaluation. In addition, the independence of the panel is significant, because it is able to address politically sensitive issues. The expert panel members typically bring lessons learned from other sites to help solve the DOE problems. In addition, their recommendations at a particular site can often be applied at other sites, making the review even more valuable. The review process can vary, but some common lessons ensure a successful review: - Use a multi-disciplinary broadly experienced team; - Engage the panel early and throughout the project; - Involve regulators and stakeholders in the workshop, if appropriate. - Provide sufficient background information; - Close the workshop with a debriefing followed by a written report. Many groundwater remediation challenges remain at DOE sites. Independent technical reviews have and will ensure that the best capabilities and experience are applied to reduce risks and uncertainties. Even though the groundwater remediation industry has developed significantly over the last twenty years, advancements are needed to address the complexities of the subsurface at the DOE sites. These advancements have tremendous potential to save millions of dollars and to accelerate the

  12. Environmental-impact assessment of dams and reservoir projects (review and a case study)

    International Nuclear Information System (INIS)

    Shah, S.M.

    2009-01-01

    Dams and reservoirs are among one of the most sensitive of all development Project, in terms of pervasiveness of their influence in altering the environmental conditions and resources. In the present study, major dams and reservoir projects are reviewed, from the environmental point of view. Dams and Reservoir projects bring about major changes in the immediate environment, thus affecting public health, settlements, farmlands, roads and historical sites. Impacts on human population and wildlife may be profound. Tropical diseases, involving fresh-water hosts or vectors in their transmission, are often common around new reservoirs. Large lakes create limnological changes, excessive evaporation, seepage, disturbance in water-table and increased tendencies of landslides and earthquakes. Micro climatic changes are possible, such as fog formation, increased cloudiness and modified rainfall-patterns. Retention of sediment results in silting up of reservoirs. Water shortages on mountain rivers may leave unsightly dry river-beds below a dam. Sediment deposition and growth of vegetation in reservoir affects the water-extraction for navigation power-generation and fishing. Various dams and reservoir projects in the world are critically studied, in terms of creating environmental impacts. The Kala Bagh Dam project (Pakistan), which is ready for construction, has been analysed as a case study, by matrix method. Analyses show that adverse effects of this dam are less than the benefits. It is recommended that based on the experience, appropriate lines and strategies may be drawn up to evaluate the local projects. Multidisciplinary experts need to be involved, for assessing environmental impacts and suggesting mitigation measures, to combat the adverse effects. (author)

  13. 77 FR 51965 - Southwest Mississippi Resource Advisory Committee

    Science.gov (United States)

    2012-08-28

    ... Committee will meet in Meadville, MS. The committee is authorized under the Secure Rural Schools and... provide advice and recommendations to the Forest Service concerning projects and funding consistent with... and recommend projects authorized under title II of the Act. DATES: The meeting will be held Tuesday...

  14. The Great Bear Flare Pit Project : review of work to date

    International Nuclear Information System (INIS)

    Ridal, J.; Lean, D.; Findlay, S.C.

    1998-01-01

    Published information regarding potential toxic agents associated with flare emissions and a study to determine the risk posed to Treaty 8 First Nations (T8FN) peoples and wildlife was reviewed as part of the Great Bear Flare Pit Project (GBFPP). The project is concerned with the study of water and soil contamination in the immediate vicinity of flare pits in the Del Rio, Doig basin, Blueberry River, and Halfway River regions of T8FN lands in Alberta. The GBFPP has established good baseline data on metal contamination, and other contaminants such as benzene, toluene, ethylbenzene, xylenes (BTEX) and polycyclic aromatic hydrocarbons (PAHs) in the immediate vicinity of selected flare pits. Based on a critical assessment of reports published to date a series of prioritized recommendations for further research are made. 18 refs., 2 tabs

  15. Review of the TMI-2 accident evaluation and vessel investigation projects

    Energy Technology Data Exchange (ETDEWEB)

    Ladekarl Thomsen, Knud

    1998-03-01

    The results of the TMI-2 Accident Evaluation Programme and the Vessel Investigation Project have been reviewed as part of a literature study on core meltdown and in-vessel coolability. The emphasis is placed on the late phase melt progression, which is of special relevance to the NKS-sponsored RAK-2.1 project on Severe Accident Phenomenology. The body of the report comprises three main sections, The TMI-2 Accident Scenario, Core Region and Relocation Path Investigations, and Lower Head Investigations. In the final discussion, the lower head gap formation mechanism is explained in terms of thermal contraction and fracturing of the debris crust. This model seems more plausible than the MAAP model based on creep expansion of the lower head. (au) 1 tab., 33 ills., 31 refs.

  16. Review: Barr, Michael and Zlatko Skrbiš (2008, Constructing Singapore. Elitism, Ethnicity and the Nation-Building Project

    Directory of Open Access Journals (Sweden)

    Boris Michel

    2009-01-01

    Full Text Available Review of the monograph: Barr, Michael and Zlatko Skrbiš, Constructing Singapore. Elitism, Ethnicity and the Nation-Building Project, Copenhagen: NIAS Press, 2008, ISBN 978-87-7694-029-4, 304 pages

  17. Using Model-Based System Engineering to Provide Artifacts for NASA Project Life-Cycle and Technical Reviews Presentation

    Science.gov (United States)

    Parrott, Edith L.; Weiland, Karen J.

    2017-01-01

    This is the presentation for the AIAA Space conference in September 2017. It highlights key information from Using Model-Based Systems Engineering to Provide Artifacts for NASA Project Life-cycle and Technical Reviews paper.

  18. Tribal Grant Program Area Polygons with Project Officer and Tribal Contact Information, US EPA Region 9, 2015, Regional Tribal Operations Committee

    Data.gov (United States)

    U.S. Environmental Protection Agency — This dataset contains information pertaining to EPA Region 9 project officers and their areas of oversight, EPA Region 9 grant program recipients and grant types,...

  19. The Contribution of Current Research and Development Projects

    Science.gov (United States)

    Townsend, H. E. R.

    1973-01-01

    Reviews recent projects on the education of immigrants within the framework of the six suggestions for research made by the Select Committee on Race Relations and Immigrations; e.g. the effects on children of various educational arrangements for immigrants; methods of teaching race relations in schools; and others. (Author/JM)

  20. Review, reaction, and projection: the role of the CFO in planning.

    Science.gov (United States)

    Nauert, R C

    1985-08-01

    In recent years, CFOs have become an integral part of the healthcare organization's strategic planning process. Although not the leader in the process, CFOs should assume a role of review, reaction, and projection. Furthermore, they should oppose any venture that would weaken the financial strength of the institution--whether or not they support the venture on social grounds. The CFO's responsibility in planning is to improve the financial strength of the organization, using support documentation, thorough preparation, and logic. The CEO's concern for community needs and desire to pursue a new business should be tempered by the CFO's financial and economic judgment.

  1. Errors, lies and misunderstandings: Systematic review on behavioural decision making in projects

    DEFF Research Database (Denmark)

    Stingl, Verena; Geraldi, Joana

    2017-01-01

    limitations—errors), pluralist (on political behaviour—lies), and contextualist (on social and organizational sensemaking—misunderstandings). Our review suggests avenues for future research with a wider coverage of theories in cognitive and social psychology and critical and mindful integration of findings...... in projects and beyond. However, the literature is fragmented and draws only on a fraction of the recent, insightful, and relevant developments on behavioural decision making. This paper organizes current research in a conceptual framework rooted in three schools of thinking—reductionist (on cognitive...

  2. Identification of suicidal ideations with the help of projective tests: a review.

    Science.gov (United States)

    Kumar, Devvarta; Nizamie, S Haque; Abhishek, Priyadarshee; Prasanna, Lavanya Tumkur

    2014-12-01

    Identification of the presence of suicidal ideations in an individual is crucial for the timely intervention. However, these ideations may remain unidentified as an individual with serious intentions of self-harm may not express them explicitly. Various projective tests can provide crucial clues to clinicians about the presence of suicidal ideations in an individual's mind. The present review is intended to update clinicians working in the field of suicide prevention about salient findings on these tests which can serve as a ready reckoner for them. We also highlight the status of research in this domain. Copyright © 2014 Elsevier B.V. All rights reserved.

  3. Using Vector Projection Method to evaluate maintainability of mechanical system in design review

    International Nuclear Information System (INIS)

    Chen Lu; Cai Jianguo

    2003-01-01

    Maintainability of a mechanical system is one of the system design parameters that has a great impact in terms of ease of maintenance. In this article, based on the definition of the terms of maintenance and maintainability, an important tool of Design for Maintenance is developed as a way to improve maintainability through design. A set of standard and organized guidelines is provided and maintainability factors in terms of physical design, logistics support and ergonomics are identified. As a specific application of design review, a methodology so called Vector Projection Method is developed to evaluate the maintainability of the mechanical system. Lastly, an example is discussed

  4. River Protection Project Integrated safety management system phase II verification review plan - 7/29/99

    International Nuclear Information System (INIS)

    SHOOP, D.S.

    1999-01-01

    The purpose of this review is to verify the implementation status of the Integrated Safety Management System (ISMS) for the River Protection Project (RPP) facilities managed by Fluor Daniel Hanford, Inc. (FDH) and operated by Lockheed Martin Hanford Company (LMHC). This review will also ascertain whether within RPP facilities and operations the work planning and execution processes are in place and functioning to effectively protect the health and safety of the workers, public, environment, and federal property over the RPP life cycle. The RPP ISMS should support the Hanford Strategic Plan (DOERL-96-92) to safely clean up and manage the site's legacy waste and deploy science and technology while incorporating the ISMS central theme to ''Do work safely'' and protect human health and the environment

  5. First NASA Aviation Safety Program Weather Accident Prevention Project Annual Review

    Science.gov (United States)

    Colantonio, Ron

    2000-01-01

    The goal of this Annual Review was to present NASA plans and accomplishments that will impact the national aviation safety goal. NASA's WxAP Project focuses on developing the following products: (1) Aviation Weather Information (AWIN) technologies (displays, sensors, pilot decision tools, communication links, etc.); (2) Electronic Pilot Reporting (E-PIREPS) technologies; (3) Enhanced weather products with associated hazard metrics; (4) Forward looking turbulence sensor technologies (radar, lidar, etc.); (5) Turbulence mitigation control system designs; Attendees included personnel from various NASA Centers, FAA, National Weather Service, DoD, airlines, aircraft and pilot associations, industry, aircraft manufacturers and academia. Attendees participated in discussion sessions aimed at collecting aviation user community feedback on NASA plans and R&D activities. This CD is a compilation of most of the presentations presented at this Review.

  6. 77 FR 66623 - Center for Scientific Review; Notice of Closed Meetings

    Science.gov (United States)

    2012-11-06

    ... personal privacy. Name of Committee: Center for Scientific Review Special Emphasis Panel; Program Project: Mass Spectrometry Resource. Date: November 26-28, 2012. Time: 7:00 p.m. to 12:00 p.m. Agenda: To review... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Center for Scientific Review...

  7. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project KDP-C Review

    Science.gov (United States)

    Grindle, Laurie; Sakahara, Robert; Hackenberg, Davis; Johnson, William

    2017-01-01

    The topics discussed are the UAS-NAS project life-cycle and ARMD thrust flow down, as well as the UAS environments and how we operate in those environments. NASA's Armstrong Flight Research Center at Edwards, CA, is leading a project designed to help integrate unmanned air vehicles into the world around us. The Unmanned Aircraft Systems Integration in the National Airspace System project, or UAS in the NAS, will contribute capabilities designed to reduce technical barriers related to safety and operational challenges associated with enabling routine UAS access to the NAS. The project falls under the Integrated Systems Research Program office managed at NASA Headquarters by the agency's Aeronautics Research Mission Directorate. NASA's four aeronautics research centers - Armstrong, Ames Research Center, Langley Research Center, and Glenn Research Center - are part of the technology development project. With the use and diversity of unmanned aircraft growing rapidly, new uses for these vehicles are constantly being considered. Unmanned aircraft promise new ways of increasing efficiency, reducing costs, enhancing safety and saving lives 460265main_ED10-0132-16_full.jpg Unmanned aircraft systems such as NASA's Global Hawks (above) and Predator B named Ikhana (below), along with numerous other unmanned aircraft systems large and small, are the prime focus of the UAS in the NAS effort to integrate them into the national airspace. Credits: NASA Photos 710580main_ED07-0243-37_full.jpg The UAS in the NAS project envisions performance-based routine access to all segments of the national airspace for all unmanned aircraft system classes, once all safety-related and technical barriers are overcome. The project will provide critical data to such key stakeholders and customers as the Federal Aviation Administration and RTCA Special Committee 203 (formerly the Radio Technical Commission for Aeronautics) by conducting integrated, relevant system-level tests to adequately address

  8. The International Science and Technology Center (ISTC) and ISTC projects related to research reactors. Information review

    International Nuclear Information System (INIS)

    Tocheniy, L.; Rudneva, V.Ya.

    1998-01-01

    1. ISTC - history, activities, outlook: The ISTC is an intergovernmental organization established by agreement between the Russian Federation, the European Union, Japan, and the United States. Since 1994, Finland, Sweden, Norway, Georgia, Armenia, Belarus, Kazakhstan and the Kyrgyz Republic have acceded to the Agreement and Statute. At present, the Republic of Korea is finishing the process of accession to the ISTC. All work of the ISTC is aimed at the goals defined in the ISTC Agreement: - To give CIS weapons scientists, particularly those who possess knowledge and skills related to weapons of mass destruction and their delivery systems, the opportunities to redirect their talents to peaceful activities; - To contribute to solving national and international technical problems; - To support the transition to market-based economies; - To support basic and applied research; - To help integrate CIS weapons scientists into the international scientific community. The projects may be funded both through governmental funds of the Funding Parties specified for the ISTC, and by organizations, nominated as Funding Partners of the ISTC. According to the ISTC Statute, approved by the appropriate national organizations, funds used within ISTC projects are exempt from CIS taxes. As of March 1998, more than 1500 proposals had been submitted to the Center, of which 541 were approved for funding, for a total value of approximately US dollars 165 million. The number of scientists and engineers participating in the projects is more than 17,000. 2. Projects Related to Research Reactors: There are about 20 funded and as yet non-funded projects related to various problems of research reactors. Many of them address safety issues. Information review of the results and plans of both ongoing projects and as yet non-funded proposals related to research reactors will be presented with the aim assisting international researchers to establish partnerships or collaboration with ISTC projects

  9. Review of Project SAFE: Comments on biosphere conceptual model description and risk assessment methodology

    Energy Technology Data Exchange (ETDEWEB)

    Klos, Richard; Wilmot, Roger [Galson Sciences Ltd (United Kingdom)

    2002-09-01

    The Swedish Nuclear Fuel and Waste Management Company's (SKB's) most recent assessment of the safety of the Forsmark repository for low-level and intermediate-level waste (Project SAFE) is currently undergoing review by the Swedish regulators. As part of its review, the Swedish Radiation Protection Institute (SSI) identified that two components of SAFE require more detailed review: (i) the conceptual model description of the biosphere system, and (ii) SKB's risk assessment methodology. We have reviewed the biosphere system interaction matrix and how this has been used in the identification, justification and description of biosphere models for radiological assessment purposes. The risk assessment methodology has been reviewed considering in particular issues associated with scenario selection, assessment timescale, and the probability and risk associated with the well scenario. There is an extensive range of supporting information on which biosphere modelling in Project SAFE is based. However, the link between this material and the biosphere models themselves is not clearly set out. This leads to some contradictions and mis-matches between description and implementation. One example concerns the representation of the geosphere-biosphere interface. The supporting description of lakes indicates that interaction between groundwaters entering the biosphere through lake bed sediments could lead to accumulations of radionuclides in sediments. These sediments may become agricultural areas at some time in the future. In the numerical modelling of the biosphere carried out in Project SAFE, the direct accumulation of contaminants in bed sediments is not represented. Application of a more rigorous procedure to ensure numerical models are fit for purpose is recommended, paying more attention to issues associated with the geosphere-biosphere interface. A more structured approach to risk assessment would be beneficial, with a better explanation of the difference

  10. Review of Project SAFE: Comments on biosphere conceptual model description and risk assessment methodology

    International Nuclear Information System (INIS)

    Klos, Richard; Wilmot, Roger

    2002-09-01

    The Swedish Nuclear Fuel and Waste Management Company's (SKB's) most recent assessment of the safety of the Forsmark repository for low-level and intermediate-level waste (Project SAFE) is currently undergoing review by the Swedish regulators. As part of its review, the Swedish Radiation Protection Institute (SSI) identified that two components of SAFE require more detailed review: (i) the conceptual model description of the biosphere system, and (ii) SKB's risk assessment methodology. We have reviewed the biosphere system interaction matrix and how this has been used in the identification, justification and description of biosphere models for radiological assessment purposes. The risk assessment methodology has been reviewed considering in particular issues associated with scenario selection, assessment timescale, and the probability and risk associated with the well scenario. There is an extensive range of supporting information on which biosphere modelling in Project SAFE is based. However, the link between this material and the biosphere models themselves is not clearly set out. This leads to some contradictions and mis-matches between description and implementation. One example concerns the representation of the geosphere-biosphere interface. The supporting description of lakes indicates that interaction between groundwaters entering the biosphere through lake bed sediments could lead to accumulations of radionuclides in sediments. These sediments may become agricultural areas at some time in the future. In the numerical modelling of the biosphere carried out in Project SAFE, the direct accumulation of contaminants in bed sediments is not represented. Application of a more rigorous procedure to ensure numerical models are fit for purpose is recommended, paying more attention to issues associated with the geosphere-biosphere interface. A more structured approach to risk assessment would be beneficial, with a better explanation of the difference between

  11. 77 FR 31071 - Research Advisory Committee on Gulf War Veterans' Illnesses, Notice of Meeting

    Science.gov (United States)

    2012-05-24

    ... DEPARTMENT OF VETERANS AFFAIRS Research Advisory Committee on Gulf War Veterans' Illnesses, Notice... Advisory Committee Act) that the Research Advisory Committee on Gulf War Veterans' Illnesses will meet on... Asia theater of operations during the Gulf War. The Committee will review VA program activities related...

  12. 75 FR 8789 - Research Advisory Committee on Gulf War Veterans' Illnesses; Notice of Meeting

    Science.gov (United States)

    2010-02-25

    ... DEPARTMENT OF VETERANS AFFAIRS Research Advisory Committee on Gulf War Veterans' Illnesses; Notice... Advisory Committee Act) that the Research Advisory Committee on Gulf War Veterans' Illnesses will meet on... theater of operations during the Gulf War. The Committee will review VA program activities related to Gulf...

  13. 75 FR 28686 - Research Advisory Committee on Gulf War Veterans' Illnesses; Notice of Meeting

    Science.gov (United States)

    2010-05-21

    ... DEPARTMENT OF VETERANS AFFAIRS Research Advisory Committee on Gulf War Veterans' Illnesses; Notice... Advisory Committee Act) that the Research Advisory Committee on Gulf War Veterans' Illnesses will meet on... Asia theater of operations during the Gulf War. The Committee will review VA program activities related...

  14. 76 FR 9407 - Research Advisory Committee on Gulf War Veterans' Illnesses; Notice of Meeting

    Science.gov (United States)

    2011-02-17

    ... DEPARTMENT OF VETERANS AFFAIRS Research Advisory Committee on Gulf War Veterans' Illnesses; Notice... Advisory Committee Act) that the Research Advisory Committee on Gulf War Veterans' Illnesses will meet on... Southwest Asia theater of operations during the Gulf War. The Committee will review VA program activities...

  15. 78 FR 77205 - Research Advisory Committee on Gulf War Veterans' Illnesses; Notice of Meeting

    Science.gov (United States)

    2013-12-20

    ... DEPARTMENT OF VETERANS AFFAIRS Research Advisory Committee on Gulf War Veterans' Illnesses; Notice... Advisory Committee Act) that the Research Advisory Committee on Gulf War Veterans' Illnesses will meet on... service in the Southwest Asia theater of operations during the Gulf War. The Committee will review VA...

  16. 75 FR 65405 - Research Advisory Committee on Gulf War Veterans' Illnesses; Notice of Meeting

    Science.gov (United States)

    2010-10-22

    ... DEPARTMENT OF VETERANS AFFAIRS Research Advisory Committee on Gulf War Veterans' Illnesses; Notice... Advisory Committee Act) that the Research Advisory Committee on Gulf War Veterans' Illnesses will meet on... Asia theater of operations during the Gulf War. The Committee will review VA program activities related...

  17. The Audit Committee. AGB Effective Committee Series

    Science.gov (United States)

    Staisloff, Richard L.

    2011-01-01

    This publication is part of an Association of Governing Boards of Universities and Colleges (AGB) series devoted to strengthening the role of key standing committees of governing boards. While there is no optimum committee system for institutions of higher education, certain principles, practices, and procedures prevail. The best practices…

  18. The Investment Committee. Effective Committees. Board Basics.

    Science.gov (United States)

    Biggs, John H.

    1997-01-01

    The investment committee of the college or university governing board is charged with determining, overseeing, and assessing the policies and processes by which institutional funds are invested. The committee has fiduciary duty to ensure that the terms of investment of donors' gifts are met and to maximize investment returns within an appropriate…

  19. Human research ethics committees: examining their roles and practices.

    Science.gov (United States)

    Guillemin, Marilys; Gillam, Lynn; Rosenthal, Doreen; Bolitho, Annie

    2012-07-01

    Considerable time and resources are invested in the ethics review process. We present qualitative data on how human research ethics committee members and health researchers perceive the role and function of the committee. The findings are based on interviews with 34 Australian ethics committee members and 54 health researchers. Although all participants agreed that the primary role of the ethics committee was to protect participants, there was disagreement regarding the additional roles undertaken by committees. Of particular concern were the perceptions from some ethics committee members and researchers that ethics committees were working to protect the institution's interests, as well as being overprotective toward research participants. This has the potential to lead to poor relations and mistrust between ethics committees and researchers.

  20. Report on system operation - A background report prepared by the Nordel Operation Committee/OPG in the Nordel project on enhancing efficient functioning of the Nordic electricity market

    International Nuclear Information System (INIS)

    2004-12-01

    This report contains the operation procedures in extreme situations and lessons learned from blackouts, based on a mandate given by the Operations Committee. Nordic TSOs have had common rules and principles for system operation i.e. System Operation Agreement since the late 1990s. The rules have been revised according to the system security and market changes and needs. The collaboration between system operators is regular and fruitful. The knowledge and capability to manage extreme situations of the Nordic power system has continuously increased and the recent blackouts did not show major deficiencies in operation practices. Regardless of the existing good collaboration it is important to continue development in the future in order to ensure high system security. Important development areas are security of reserve supervision and coordination of calculation procedures for transmission limits, enhancement of data exchange routines between control centres in order to improve the overview of the system security within the Nordic power system. More extensive coordination of outage planning processes will further improve the system security. Continuously training of operational staff is important to be able to manage different situations and disturbances efficiently. (BA)

  1. The job of 'ethics committees'.

    Science.gov (United States)

    Moore, Andrew; Donnelly, Andrew

    2015-11-13

    What should authorities establish as the job of ethics committees and review boards? Two answers are: (1) review of proposals for consistency with the duly established and applicable code and (2) review of proposals for ethical acceptability. The present paper argues that these two jobs come apart in principle and in practice. On grounds of practicality, publicity and separation of powers, it argues that the relevant authorities do better to establish code-consistency review and not ethics-consistency review. It also rebuts bad code and independence arguments for the opposite view. It then argues that authorities at present variously specify both code-consistency and ethics-consistency jobs, but most are also unclear on this issue. The paper then argues that they should reform the job of review boards and ethics committees, by clearly establishing code-consistency review and disestablishing ethics-consistency review, and through related reform of the basic orientation, focus, name, and expertise profile of these bodies and their actions. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  2. Review on the Projections of Future Storminess over the North Atlantic European Region

    Directory of Open Access Journals (Sweden)

    Tina Mölter

    2016-04-01

    Full Text Available This is an overview of the results from previously published climate modeling studies reporting on projected aspects of future storminess over the North Atlantic European region (NAER in the period 2020–2190. Changes in storminess are summarized for seven subregions in the study area and rated by a categorical evaluation scheme that takes into account emission scenarios and modeling complexity in the reviewed studies. Although many of the reviewed studies reported an increase in the intensity of high-impact wind speed and extreme cyclone frequency in the second half of the 21st century, the projections of aspects of future storminess over the NAER differed regionally. There is broad consensus that the frequency and intensity of storms, cyclones, and high-impact wind speed will increase over Central and Western Europe, and these changes will probably have the potential to produce more damage. In contrast, future extratropical storminess over Southern Europe is very likely to decrease. For Northern and Eastern Europe the results of the evaluation are inconclusive, because there is an indication of increasing as well as decreasing development of the evaluated aspects of future storminess. Concerning the storm track, we found indications of a likely north- and eastward shift in most assessed studies. Results from three studies suggest a northeastward shift of the North Atlantic Oscillation.

  3. Projecting changes in the distribution and productivity of living marine resources: A critical review of the suite of modelling approaches used in the large European project VECTORS

    NARCIS (Netherlands)

    Peck, Myron A.; Arvanitidis, Christos; Butenschön, Momme; Canu, Donata Melaku; Chatzinikolaou, Eva; Cucco, Andrea; Domenici, Paolo; Fernandes, Jose A.; Gasche, Loic; Huebert, Klaus B.; Hufnagl, Marc; Jones, Miranda C.; Kempf, Alexander; Keyl, Friedemann; Maar, Marie; Mahévas, Stéphanie; Marchal, Paul; Nicolas, Delphine; Pinnegar, John K.; Rivot, Etienne; Rochette, Sébastien; Sell, Anne F.; Sinerchia, Matteo; Solidoro, Cosimo; Somerfield, Paul J.; Teal, Lorna R.; Travers-trolet, Morgan; De Wolfshaar, Van Karen E.

    2018-01-01

    We review and compare four broad categories of spatially-explicit modelling approaches currently used to understand and project changes in the distribution and productivity of living marine resources including: 1) statistical species distribution models, 2) physiology-based, biophysical models of

  4. Spent Nuclear Fuel (SNF) Project Cask and MCO Helium Purge System Design Review Completion Report - Project A.5 and A.6

    International Nuclear Information System (INIS)

    ARD, K.E.

    2000-01-01

    This report documents the results of the design verification performed on the Cask and Multiple Canister Over-pack (MCO) Helium Purge System. The helium purge system is part of the Spent Nuclear Fuel (SNF) Project Cask Loadout System (CLS) at 100K area. The design verification employed the ''Independent Review Method'' in accordance with Administrative Procedure (AP) EN-6-027-01

  5. What Is Our Current Understanding of One-to-One Computer Projects: A Systematic Narrative Research Review

    Science.gov (United States)

    Fleischer, Hakan

    2012-01-01

    The aim of this article is to review cross-disciplinary accumulated empirical research on one-to-one computer projects in school settings as published in peer-reviewed journals between 2005 and 2010, particularly the results of teacher- and pupil-oriented studies. Six hundred and five research articles were screened at the abstract and title…

  6. 43 CFR 404.51 - Are proposed projects under the Rural Water Supply Program reviewed by the Administration?

    Science.gov (United States)

    2010-10-01

    ... Water Supply Program reviewed by the Administration? 404.51 Section 404.51 Public Lands: Interior... SUPPLY PROGRAM Feasibility Studies § 404.51 Are proposed projects under the Rural Water Supply Program... the Reclamation's Rural Water Supply Program. This includes review under Executive Order 12322 to...

  7. Advisory Committee Handbook.

    Science.gov (United States)

    Black Hawk Coll., Moline, IL.

    An advisory committee is generally comprised of persons outside the education profession who have specialized knowledge in a given area. The committee advises, makes recommendations, and gives service to the college and its students, instructors, and administrators. At Black Hawk College, there are four types of advisory committees: community,…

  8. Hawaii Energy Strategy Project 2: Fossil Energy Review. Task IV. Scenario development and analysis

    Energy Technology Data Exchange (ETDEWEB)

    Yamaguchi, N.D.; Breazeale, K. [ed.

    1993-12-01

    The Hawaii Energy Strategy (HES) Program is a seven-project effort led by the State of Hawaii Department of Business, Economic Development & Tourism (DBEDT) to investigate a wide spectrum of Hawaii energy issues. The East-West Center`s Program on Resources: Energy and Minerals, has been assigned HES Project 2, Fossil Energy Review, which focuses on fossil energy use in Hawaii and the greater regional and global markets. HES Project 2 has four parts: Task I (World and Regional Fossil Energy Dynamics) covers petroleum, natural gas, and coal in global and regional contexts, along with a discussion of energy and the environment. Task II (Fossil Energy in Hawaii) focuses more closely on fossil energy use in Hawaii: current utilization and trends, the structure of imports, possible future sources of supply, fuel substitutability, and energy security. Task III`s emphasis is Greenfield Options; that is, fossil energy sources not yet used in Hawaii. This task is divided into two sections: first, an in-depth {open_quotes}Assessment of Coal Technology Options and Implications for the State of Hawaii,{close_quotes} along with a spreadsheet analysis model, which was subcontracted to the Environmental Assessment and Information Sciences Division of Argonne National Laboratory; and second, a chapter on liquefied natural gas (LNG) in the Asia-Pacific market and the issues surrounding possible introduction of LNG into the Hawaii market.

  9. The Society for Implementation Research Collaboration Instrument Review Project: a methodology to promote rigorous evaluation.

    Science.gov (United States)

    Lewis, Cara C; Stanick, Cameo F; Martinez, Ruben G; Weiner, Bryan J; Kim, Mimi; Barwick, Melanie; Comtois, Katherine A

    2015-01-08

    Identification of psychometrically strong instruments for the field of implementation science is a high priority underscored in a recent National Institutes of Health working meeting (October 2013). Existing instrument reviews are limited in scope, methods, and findings. The Society for Implementation Research Collaboration Instrument Review Project's objectives address these limitations by identifying and applying a unique methodology to conduct a systematic and comprehensive review of quantitative instruments assessing constructs delineated in two of the field's most widely used frameworks, adopt a systematic search process (using standard search strings), and engage an international team of experts to assess the full range of psychometric criteria (reliability, construct and criterion validity). Although this work focuses on implementation of psychosocial interventions in mental health and health-care settings, the methodology and results will likely be useful across a broad spectrum of settings. This effort has culminated in a centralized online open-access repository of instruments depicting graphical head-to-head comparisons of their psychometric properties. This article describes the methodology and preliminary outcomes. The seven stages of the review, synthesis, and evaluation methodology include (1) setting the scope for the review, (2) identifying frameworks to organize and complete the review, (3) generating a search protocol for the literature review of constructs, (4) literature review of specific instruments, (5) development of an evidence-based assessment rating criteria, (6) data extraction and rating instrument quality by a task force of implementation experts to inform knowledge synthesis, and (7) the creation of a website repository. To date, this multi-faceted and collaborative search and synthesis methodology has identified over 420 instruments related to 34 constructs (total 48 including subconstructs) that are relevant to implementation

  10. Is Project Towards No Drug Abuse (Project TND) an evidence-based drug and violence prevention program? A review and reappraisal of the evaluation studies.

    Science.gov (United States)

    Gorman, Dennis M

    2014-08-01

    This paper critically reviews the published evidence pertaining to Project Towards No Drug Abuse (Project TND). Publications from seven evaluation studies of Project TND are reviewed, and the results from these are discussed as related to the following outcomes: main effects on the use of cigarettes, alcohol and marijuana; main effects on the use of "hard drugs," defined in the evaluations as cocaine, hallucinogens, stimulants, inhalants, ecstasy and other drugs (e.g., depressants, PCP, steroids and heroin); subgroup and interaction analyses of drug use; and violence-related behaviors. Very few main effects have been found for cigarette, alcohol and marijuana use in the Project TND evaluations. While studies do report main effects for hard drug use, these findings are subject to numerous threats to validity and may be attributable to the data analyses employed. Similarly, while isolated subgroup and interaction effects were found for alcohol use among baseline nonusers and some violence-related behaviors in the early Project TND evaluations, these findings have not been replicated in more recent studies and may result from multiple comparisons between study conditions. In conclusion, there is little evidence to support the assertion that Project TND is an effective drug or violence prevention program. The broader implications of these findings for prevention science are discussed and suggestions are made as to how the quality of research in the field might be improved.

  11. Taking stock of project value creation: A structured literature review with future directions for research and practice

    DEFF Research Database (Denmark)

    Laursen, Markus; Svejvig, Per

    2016-01-01

    This paper aims to take stock of what we know about project value creation and to present future directions for research and practice. We performed an explorative and unstructured literature review, which was subsequently paired with a structured literature review. We join several research areas...... by adopting the project value creation perspective on literature relating to benefits, value, performance, and success in projects. Our review includes 111 contributions analyzed through both an inductive and deductive approach. We find that relevant literature dates back to the early 1980s, and the still...... developing value-centric view has been the subject of many publications in recent years. We contribute to research on project value creation through four directions for future research: rejuvenating value management through combining value, benefits, and costs; supplementing value creation with value capture...

  12. Human research ethics committees in technical universities.

    Science.gov (United States)

    Koepsell, David; Brinkman, Willem-Paul; Pont, Sylvia

    2014-07-01

    Human research ethics has developed in both theory and practice mostly from experiences in medical research. Human participants, however, are used in a much broader range of research than ethics committees oversee, including both basic and applied research at technical universities. Although mandated in the United States, the United Kingdom, Canada, and Australia, non-medical research involving humans need not receive ethics review in much of Europe, Asia, Latin America, and Africa. Our survey of the top 50 technical universities in the world shows that, where not specifically mandated by law, most technical universities do not employ ethics committees to review human studies. As the domains of basic and applied sciences expand, ethics committees are increasingly needed to guide and oversee all such research regardless of legal requirements. We offer as examples, from our experience as an ethics committee in a major European technical university, ways in which such a committee provides needed services and can help ensure more ethical studies involving humans outside the standard medical context. We provide some arguments for creating such committees, and in our supplemental article, we provide specific examples of cases and concerns that may confront technical, engineering, and design research, as well as outline the general framework we have used in creating our committee. © The Author(s) 2014.

  13. Report on the behalf of the Joint Parliamentary Committee tasked with the proposition of a draft on issues which are still to be discussed in the bill project related to energy transition and green growth. Nr 2624, Nr 331

    International Nuclear Information System (INIS)

    Battistel, Marie-Noelle; Buis, Sabine; Plisson, Philippe; Poniatowski, Ladislas; Negre, Louis

    2015-01-01

    This document first reports the discussion of the Joint Parliamentary Committee on the proposition made by the French Senate and the French National Assembly about the bill project on energy transition and green growth. The second part contains a table which proposes a comparison between the text adopted by the National Assembly in first reading and the text adopted by the Senate in first reading. The bill project addresses: 1) the definition of common objectives for a successful energy transition, for a stronger energy independence for France, and for the struggle against climate change; 2) a better renovation of buildings to save energy, to lower energy bills, and to create jobs; 3) the development of clean transports to improve air quality and to protect health; 4) the struggle against wastage and the promotion of circular economy from product design to product recycling; 5) the promotion of renewable energies to diversify energies and to valorise territorial resources; 6) the strengthening of nuclear safety and citizen information; 7) the simplification and clarification of procedures for improved efficiency and competitiveness; 8) the possibility for citizen, enterprises, territories and State to act together

  14. Knowledge about the research and ethics committee at Makerere ...

    African Journals Online (AJOL)

    Background: All research involving human participants should be reviewed by a competent and independent institutional research and ethics committee. Research conducted at Makerere University College of Health Sciences should be subjected to a rigorous review process by the ethics committee in order to protect ...

  15. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  16. 34 CFR 350.35 - What are the requirements for the composition of an advisory committee?

    Science.gov (United States)

    2010-07-01

    ... DISABILITY AND REHABILITATION RESEARCH PROJECTS AND CENTERS PROGRAM What Rehabilitation Engineering Research... committee? The majority of a Rehabilitation Engineering Research Center advisory committee's members must be comprised of individuals with disabilities who are users of rehabilitation technology, or their parents...

  17. Points from the September Committee Meetings

    CERN Multimedia

    2002-01-01

    After a turbulent year, the Committee meetings during the week beginning 16th September took a calmer nature, even if the follow-up of the cost-to-completion review was still a central topic of discussion. The detailed Action Plan and timetable for implementing the recommendations of the External Review Committee were among the principle items. The Plan is based on actions that address specific recommendations, from the redeployment of staff to the LHC to improved financial controls and budgetary tools. It was well received by the Committees and will be presented to the full CERN Council in December. In the meantime, many actions are underway, such as the restructuring of the Accelerator Sector, and the establishment of an external committee to review costs and progress of the LHC on an annual basis. The Finance Committee examined the proposed budget for 2003, which will also be presented to Council for approval in December. In addition, the Committee approved the volume of Industrial Support contracts for 20...

  18. Research ethics review at University Eduardo Mondlane (UEM)/Maputo Central Hospital, Mozambique (2013-2016): a descriptive analysis of the start-up of a new research ethics committee (REC).

    Science.gov (United States)

    Sacarlal, Jahit; Muchanga, Vasco; Mabutana, Carlos; Mabui, Matilde; Mariamo, Arlete; Cuamba, Assa Júlio; Fumo, Leida Artur; Silveira, Jacinta; Heitman, Elizabeth; Moon, Troy D

    2018-05-23

    Mozambique has seen remarkable growth in biomedical research over the last decade. To meet a growing need, the National Committee for Bioethics in Health of Mozambique (CNBS) encouraged the development of ethical review processes at institutions that regularly conduct medical and social science research. In 2012, the Faculty of Medicine (FM) of University Eduardo Mondlane (UEM) and the Maputo Central Hospital (MCH) established a joint Institutional Committee on Bioethics for Health (CIBS FM & MCH). This study examines the experience of the first 4 years of the CIBS FM & MCH. This study provides a descriptive, retrospective analysis of research protocols submitted to and approved by the CIBS FM & MCH between March 1, 2013 and December 31, 2016, together with an analysis of the Committee's respective reviews and actions. A total of 356 protocols were submitted for review during the period under analysis, with 309 protocols approved. Sixty-four percent were submitted by students, faculty, and researchers from UEM, mainly related to Master's degree research (42%). Descriptive cross-sectional studies were the most frequently reviewed research (61%). The majority were prospective (71%) and used quantitative methodologies (51%). The Departments of Internal Medicine at MCH and Community Health at the FM submitted the most protocols from their respective institutions, with 38 and 53% respectively. The CIBS's average time to final approval for all protocols was 56 days, rising to 161 for the 40 protocols that required subsequent national-level review by the CNBS. Our results show that over its first 4 years, the CIBS FM & MCH has been successful in managing a constant demand for protocol review and that several broad quality improvement initiatives, such as investigator mentoring and an electronic protocol submission platform have improved efficiency in the review process and the overall quality of the protocols submitted. Beyond Maputo, long-term investments in training

  19. Managing multiple projects: a literature review of setting priorities and a pilot survey of healthcare researchers in an academic setting.

    Science.gov (United States)

    Hopkins, Robert Borden; Campbell, Kaitryn; O'Reilly, Daria; Tarride, Jean-Eric; Bowen, Jim; Blackhouse, Gord; Goerre, Ron

    2007-05-16

    To summarize and then assess with a pilot study the use of published best practice recommendations for priority setting during management of multiple healthcare research projects, in a resource-constrained environment. Medical, economic, business, and operations literature was reviewed to summarize and develop a survey to assess best practices for managing multiple projects. Fifteen senior healthcare research project managers, directors, and faculty at an urban academic institution were surveyed to determine most commonly used priority rules, ranking of rules, characteristics of their projects, and availability of resources. Survey results were compared to literature recommendations to determine use of best practices. Seven priority-setting rules were identified for managing multiple projects. Recommendations on assigning priorities by project characteristics are presented. In the pilot study, a large majority of survey respondents follow best practice recommendations identified in the research literature. However, priority rules such as Most Total Successors (MTS) and Resource Scheduling Method (RSM) were used "very often" by half of the respondents when better performing priority rules were available. Through experience, project managers learn to manage multiple projects under resource constraints. Best practice literature can assist project managers in priority setting by recommending the most appropriate priority given resource constraints and project characteristics. There is room for improvement in managing multiple projects.

  20. Visualizing Article Similarities via Sparsified Article Network and Map Projection for Systematic Reviews.

    Science.gov (United States)

    Ji, Xiaonan; Machiraju, Raghu; Ritter, Alan; Yen, Po-Yin

    2017-01-01

    Systematic Reviews (SRs) of biomedical literature summarize evidence from high-quality studies to inform clinical decisions, but are time and labor intensive due to the large number of article collections. Article similarities established from textual features have been shown to assist in the identification of relevant articles, thus facilitating the article screening process efficiently. In this study, we visualized article similarities to extend its utilization in practical settings for SR researchers, aiming to promote human comprehension of article distributions and hidden patterns. To prompt an effective visualization in an interpretable, intuitive, and scalable way, we implemented a graph-based network visualization with three network sparsification approaches and a distance-based map projection via dimensionality reduction. We evaluated and compared three network sparsification approaches and the visualization types (article network vs. article map). We demonstrated the effectiveness in revealing article distribution and exhibiting clustering patterns of relevant articles with practical meanings for SRs.

  1. Projecting hydropower production under future climates: a review of modelling challenges and open questions

    Science.gov (United States)

    Schaefli, Bettina

    2015-04-01

    Hydropower is a pillar for renewable electricity production in almost all world regions. The planning horizon of major hydropower infrastructure projects stretches over several decades and consideration of evolving climatic conditions plays an ever increasing role. This review of model-based climate change impact assessments provides a synthesis of the wealth of underlying modelling assumptions, highlights the importance of local factors and attempts to identify the most urgent open questions. Based on existing case studies, it critically discusses whether current hydro-climatic modelling frameworks are likely to provide narrow enough water scenario ranges to be included into economic analyses for end-to-end climate change impact assessments including electricity market models. This will be completed with an overview of not or indirectly climate-related boundary conditions, such as economic growth, legal constraints, national subsidy frameworks or growing competition for water, which might locally largely outweigh any climate change impacts.

  2. Factors influencing the effectiveness of research ethics committees.

    Science.gov (United States)

    Schuppli, C A; Fraser, D

    2007-05-01

    Research ethics committees - animal ethics committees (AECs) for animal-based research and institutional research boards (IRBs) for human subjects - have a key role in research governance, but there has been little study of the factors influencing their effectiveness. The objectives of this study were to examine how the effectiveness of a research ethics committee is influenced by committee composition and dynamics, recruitment of members, workload, participation level and member turnover. As a model, 28 members of AECs at four universities in western Canada were interviewed. Committees were selected to represent variation in the number and type of protocols reviewed, and participants were selected to include different types of committee members. We found that a bias towards institutional or scientific interests may result from (1) a preponderance of institutional and scientist members, (2) an intimidating atmosphere for community members and other minority members, (3) recruitment of community members who are affiliated with the institution and (4) members joining for reasons other than to fulfil the committee mandate. Thoroughness of protocol review may be influenced by heavy workloads, type of review process and lack of full committee participation. These results, together with results from the literature on research ethics committees, suggested potential ways to improve the effectiveness of research ethics committees.

  3. Using Model-Based Systems Engineering To Provide Artifacts for NASA Project Life-Cycle and Technical Reviews

    Science.gov (United States)

    Parrott, Edith L.; Weiland, Karen J.

    2017-01-01

    The ability of systems engineers to use model-based systems engineering (MBSE) to generate self-consistent, up-to-date systems engineering products for project life-cycle and technical reviews is an important aspect for the continued and accelerated acceptance of MBSE. Currently, many review products are generated using labor-intensive, error-prone approaches based on documents, spreadsheets, and chart sets; a promised benefit of MBSE is that users will experience reductions in inconsistencies and errors. This work examines features of SysML that can be used to generate systems engineering products. Model elements, relationships, tables, and diagrams are identified for a large number of the typical systems engineering artifacts. A SysML system model can contain and generate most systems engineering products to a significant extent and this paper provides a guide on how to use MBSE to generate products for project life-cycle and technical reviews. The use of MBSE can reduce the schedule impact usually experienced for review preparation, as in many cases the review products can be auto-generated directly from the system model. These approaches are useful to systems engineers, project managers, review board members, and other key project stakeholders.

  4. SKB's Project SAFE for the SFR 1 Repository. A Review by Consultants to SKI

    International Nuclear Information System (INIS)

    Chapman, N.A.; Maul, P.R.; Robinson, P.C.; Savage, D.

    2002-06-01

    The SFR 1 repository used for final disposal of low- and intermediate level radioactive waste produced by the Swedish nuclear power programme, industry, medicine and research. In 1992 it was granted a full-scale operating permit following additional reporting on long-term safety aspects by SKB, including the first in-depth safety assessment in 1991. It was stipulated as part of the full-scale licence for SFR 1 that a revised safety assessment should be carried out by SKB at least every ten years during the continued operation of the facility. The first 10-year SKB re-evaluation, called 'Project SAFE', was submitted to the regulators in 2001. The review of Project SAFE presented in this report is the culmination of several years' work with SKI including: 1. The extension and application of SKI's 'systems' approach to set up a description of the SFR 1 repository using Process Influence Diagrams (PIDs). 2. Participation in the development of a flexible Performance Assessment (PA) software tool (the AMBER code) that enables time-dependent analyses to be made of system behaviour. 3. Use of the PID database to explore, from first principles, issues that are likely to be important in the safety performance of SFR 1 and thereby to identify topics to be explored by PA modelling. 4. Peer review of the main SKB Project SAFE supporting documentation to evaluate quality, completeness and the implications of the results. 5. An independent PA exercise, using the AMBER code. 6. A review of an English translation of Section 5 of SKB's Project SAFE Final Safety Report. The present report covers only items 3 to 6, and a separate report provides a more detailed description of item 5. As a result of this review, the key issues that the regulatory authorities will need to address when reviewing SKB's safety case for SFR 1 have been identified as: 1. There is no clear statement of SKB's overall safety concept for SFR 1. It is therefore difficult to judge the results of the PA against

  5. A review of Environmental Impact Assessment parameters required for set up of a hydropower project

    International Nuclear Information System (INIS)

    Roy, Pankaj Kumar; Mazumdar, Asis

    2013-01-01

    Environmental Impact Assessment in general, hydro-meteorological conditions, topography, hydrology, water availability analysis of a river system, importance of hydropower and feasibility study of Environmental Impact assessment due to the construction of the hydropower plant have been discussed in this research work. The site selection is one of the major components so far the hydropower is concerned and also the minimum flow should have known to us so that the capacity of a hydropower plant can be predicted. The sustainable flow, which refers the flow is available throughout the year, has been calculated based on flow duration curve. This study highlights the environmental impact assessment particularly related to hydropower project. Here the study area a district town located in the eastern region of India on the banks of river Kosi has been considered. The historical rainfall and the river discharge data have been collected from various organizations. The stage-discharge correlation and hydrological parameters related to hydropower have been analyzed and also to discuss the review of environmental impact assessment in hydropower project. The EIA analysis can be also carried out by using fuzzy logic wherein the EIA parameters can be given different weight-age based on the various survey reports that have been carried out at different places at different time. Such analysis has also been provided below based on the various data obtained.

  6. A review of the design, construction and development of the PUSPATI project

    International Nuclear Information System (INIS)

    Ahmad Tajuddin Ali.

    1983-01-01

    The setting up of the Tun Ismail Atomic Research Centre (PUSPATI) was decided upon in September 1972 and soon after, plans were underway for the purchase of a research reactor and the construction of a research centre to house it. The centre was originally planned to be located at Sungai Buloh about 20 km to the north-west of Kuala Lumpur. However, in September 1978, a decision was made to locate the centre at Bangi, about 32 km to south of Kuala Lumpur. Earth work was started in January 1979 with clearing of the forest at the proposed site. Building construction started in February 1980. By September 1981, the reactor building was practically completed and enable reactor construction to begin. This was finished on July 15, 1982 when the reactor was officially handed over to PUSPATI. Work on the rest of the complex fell behind schedule and was only completed in July 1983 when PUSPATI moved in to occupy the research laboratories. The implementation of the PUSPATI project has been completed not without its share of problems. Its completion also marks the beginning of a new era for the development of nuclear science and technology in this country. This paper reviews the design, construction and development of the entire project. (author)

  7. Child injuries in Ethiopia: A review of the current situation with projections.

    Science.gov (United States)

    Li, Qingfeng; Alonge, Olakunle; Lawhorn, Collene; Ambaw, Yirga; Kumar, Smita; Jacobs, Troy; Hyder, Adnan A

    2018-01-01

    Heavy burden of child injuries and lack of policy response in Ethiopia call for an improved understanding of the situation and development of action plans from multiple governmental agencies and stakeholders. A consortium of international and Ethiopian researchers and stakeholders used extensive literature review and mixed analytical methods to estimate and project the burden of fatal and non-fatal child unintentional injuries in Ethiopia from 2015 to 2030. Estimates were derived for children aged 0-14 years. Data sources include a longitudinal study conducted by the Central Statistics Agency of Ethiopia and the World Bank as well as model-based estimates from World Health Organization 2017 and Global Burden of Disease 2016 project. Injuries caused about 25 thousand deaths among 0-14-year olds in Ethiopia in 2015. The leading cause of fatal child unintentional injuries in Ethiopia was road-traffic injuries, followed by fire, heat and hot substances and drowning. The death rate due to injuries among 0-14 years olds was about 50 percent higher in males than females. Rural children were exposed to a greater risk of injury than their urban peers. The longitudinal survey suggests that the incidence rate of child injuries increased during the period 2011-2014. The annual mortality caused by injuries is projected to increase from 10,697 in 2015 to 11,279 in 2020 and 11,989 in 2030 among children under 5 years, an increase of 12 percentage points in 15 years. The number of deaths among 0-14-year olds will be 26,463, 27,807, and 30,364 respectively in 2015, 2020, and 2030. As the first multisectoral collaboration on child injuries in Ethiopia, this study identified gaps in understanding of the burden of child injuries in Ethiopia. In consultation with Ethiopian government and other stakeholders, we propose starting an injury surveillance system at health clinics and hospitals and building an intervention package based on existing platforms.

  8. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 87

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    Approximately 30 research projects are summarized in this report. Title of the project, contract number, company or university, award amount, principal investigators, objectives, and summary of technical progress are given for each project. Enhanced oil recovery projects include chemical flooding, gas displacement, and thermal recovery. Most of the research projects though are related to geoscience technology and reservoir characterization.

  9. Tri-State Synfuels Project Review: Volume 12. Fluor project status. [Proposed Henderson, Kentucky coal to gasoline plant; engineering

    Energy Technology Data Exchange (ETDEWEB)

    1982-06-01

    The purpose of this report is to document and summarize activities associated with Fluor's efforts on the Tri-State Synfuels Project. The proposed facility was to be coal-to-transport fuels facility located in Henderson, Kentucky. Tri-State Synfuels Company was participating in the project as a partner of the US Department of Energy per terms of a Cooperative Agreement resulting from DOE's synfuel's program solicitation. Fluor's initial work plan called for preliminary engineering and procurement services to the point of commitment for construction for a Sasol Fischer-Tropsch plant. Work proceeded as planned until October 1981 when results of alternative coal-to-methanol studies revealed the economic disadvantage of the Synthol design for US markets. A number of alternative process studies followed to determine the best process configuration. In January 1982 Tri-State officially announced a change from Synthol to a Methanol to Gasoline (MTG) design basis. Further evaluation and cost estimates for the MTG facility eventually led to the conclusion that, given the depressed economic outlook for alternative fuels development, the project should be terminated. Official announcement of cancellation was made on April 13, 1982. At the time of project cancellation, Fluor had completed significant portions of the preliminary engineering effort. Included in this report are descriptions and summaries of Fluor's work during this project. In addition location of key project data and materials is identified and status reports for each operation are presented.

  10. US Geological Survey Committee for the Advancement of Science in the Yucca Mountain Project symposium on open-quotes Fractures, Hydrology, and Yucca Mountainclose quotes: Abstracts and summary

    International Nuclear Information System (INIS)

    Gomberg, J.

    1991-01-01

    The principal objective of this symposium is to review the available information on fractured/faulted terrains in terms of a coherent hydrogeologic model of ground-water fluid flow and transport, particularly as it pertains to the Yucca Mountain region. This review addresses the influence and significance of fractures on ground-water flow and the transport of conservative-species solutes within the context of the hydrogeologic setting of the Yucca Mountain area. The relations between fluid flow and fractured or faulted host rock are examined integrally from information on geologic, seismologic, hydrologic, and geomechanical properties of the system. The development of new hydrogeologic approaches that incorporate information from this integrated database are contrasted with more standard approaches toward understanding flow in fractured reservoirs. Ground-water flow in both the unsaturated zone and the saturated zone are considered. The application of various models of flow is addressed, examples include porous-media equivalent and discontinuum fracture-network models. Data and interpretations from the Yucca Mountain area are presented to establish a context for information exchange. The symposium includes discussions relevant to technical considerations for characterizing the Yucca Mountain area hydrogeology. On the basis of these discussions, CASY has compiled this document in order to formally summarize the proceedings and communicate recommendations for future directions of research and investigation

  11. 78 FR 69991 - Advisory Committee; Veterinary Medicine Advisory Committee; Termination

    Science.gov (United States)

    2013-11-22

    .... FDA-2013-N-1380] Advisory Committee; Veterinary Medicine Advisory Committee; Termination AGENCY: Food... announcing the termination of the Veterinary Medicine Advisory Committee. This document removes the Veterinary Advisory Committee from the Agency's list of standing advisory committees. DATES: This rule is...

  12. HIV/AIDS research conducted in the developing world and sponsored by the developed world: reporting of research ethics committee review in two countries.

    Science.gov (United States)

    Chin, Lisa Judy; Rifai-Bashjawish, Hoda; Kleinert, Kelly; Saltman, Alexandra; Leu, Cheng-Shiun; Klitzman, Robert

    2011-09-01

    We explored how often journal articles reporting HIV research sponsored by a developed country, but conducted in a developing country, mention research ethics committee (REC) approval from both countries, and what factors are involved. Of all such 2007 articles on Medline conducted in one of four developing countries (N = 154), only 52% mentioned such dual approval. Mention of dual vs. single approval was more likely among articles with ≥ 50% sponsor country authors, and the United States as the sponsor country. Also, dual approval was more likely among articles that mentioned informed consent and funding, had ≥ 50% sponsor country authors, were biomedical (vs. psychosocial), and appeared in journals adopting International Committee Medical Journal Editors (ICMJE) guidelines. Dual approval was thus obtained in only half of the articles and was associated with ethical and logistic issues, indicating the need for clearer and more universally accepted guidelines.

  13. Executive summary and guide to final report: Advisory committee on human radiation experiments

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-01-01

    On January 15, 1994, President Clinton appointed the Advisory Committee on Human Radiation Experiments to investigate reports of possibly unethical experiments funded by the government decades ago. The Committee was directed to uncover the history of human radiation experiments during the period 1944 through 1974 and to examine cases in which the government had intentionally released radiation into the environment for research purposes. The Committee was further charged with identifying the ethical and scientific standards for evaluating these events, and with making recommendations to ensure that whatever wrongdoing may have ocurred in the past cannot be repeated. The Committee undertook three projects: A review of how each agency of the federal government that currently conducts or funds research involving human subjects regulates this activity or oversees it; An examination of the documents and consent forms of research projects that are today sponsored by the federal government in order to develop insight into the current status of protections for the rights and interests of human subjects; and, Interviews of nearly 1,900 patients receiving out-patient medical care in private hospitals and federal facilities throughout the country. This booklet provides an overview of the Final Report, summarizing each chapter.

  14. Decisions by Finnish Medical Research Ethics Committees: A Nationwide Study of Process and Outcomes.

    Science.gov (United States)

    Hemminki, Elina; Virtanen, Jorma I; Regushevskaya, Elena

    2015-10-01

    Review by research ethics committees (RECs) is the key in medical research regulation. Data from meeting notes and project summaries were abstracted from all projects submitted in 2002 (n = 1,004) and 2007 (n = 1,045) to the official medical RECs in Finland. Data from consecutive submissions were combined per project. When comparing RECs, logistic regression was used to adjust for application characteristics. The number of projects handled varied notably by REC. In the first handling, 85% of applications in 2002 and 77% in 2007 were approved, while 13% and 20% were tabled. For 61% of the projects, the review time was 89 days, and 6% had 6 months or longer. The variation by REC in approval rates, number of handlings, or long review times was not explained by project characteristics. In the last handling, 94% of the projects in both years were approved or concluded not to need a statement from that REC. The most common reason for tabling or not approving an application was patient autonomy, usually centered on the patient leaflet. The next most common reasons were requests for further information and dissatisfaction with the scientific aspects of the project. The reasons classified as "ethics" in the narrow sense were rare. The REC focus was to assure that researchers follow the various rules on medical research and to improve the quality of research and project documents. REC considerations could be divided into decisions based on ethics and recommendations covering other aspects. © The Author(s) 2015.

  15. Information and Communications Technologies Health Projects in Panama: A Systematic Review and their Relation with Public Policies.

    Science.gov (United States)

    Sánchez, Gema Anabel Castillo; Berbey, Aranzazu; de la Torre-Díez, Isabel; López-Coronado, Miguel

    2017-07-01

    This paper presents a review about Information and Communications Technologies (ICTs) health projects in Panama. The main contribution is to provide a vision of the situation in Panama, allowing an understanding of the dynamics of health policies and how they have affected the implementation of ICT's Projects to improve the health of Panamanians. We analyze the projects found with ICT's in health of Panama, which allow us to see a perspective of projects information is obtained from 2000 to 2016, however it is important to highlight that there may be other projects that we do not know because we did not find enough information or evidence of the same. That is why this review has interviews with key personnel, who have guided us with the search for information. 56% of technology projects are concentrated in the capital city and only 16% in the province of Chiriquí. 64% of these projects are focused on the development of information systems, mainly focused on electronic patient registration. And 60% refers to projects related to primary health care. The MINSA and CSS both with a 20% participation in ICT project, in addition we can notice the dispersion of projects for hospitals, where each one is developing programs per their needs or priorities. The national information about ICT projects of Health, it has been notorious the state of dispersion and segmented of public health information. We consider that it is a natural consequence of Policy in Panamanian Health System. This situation limits the information retrieval and knowledge of ICT in Health of Panama. To stakeholders, this information is directed so that health policies are designed towards a more effective and integral management, administering the ICT's as tools for the well-being of most the Panamanian population, including indigenous group.

  16. Esthesioneuroblastoma in pediatric and adolescent age. A report from the TREP project in cooperation with the Italian Neuroblastoma and Soft Tissue Sarcoma Committees

    International Nuclear Information System (INIS)

    Bisogno, Gianni; Soloni, Pietro; Conte, Massimo; Podda, Marta; Ferrari, Andrea; Garaventa, Alberto; Luksch, Roberto; Cecchetto, Giovanni

    2012-01-01

    Esthesioneuroblastoma (ENB) is a rare, aggressive tumor with no established treatment in children. We analyzed a series of pediatric ENB patients with the aim of improving our knowledge of this disease. 9 patients (6 males; age 0.9-18 years, median 9.9) were identified by searching the AIEOP (Italian Association of Pediatric Hematology and Oncology) registry and the national databases of rare tumors, soft tissue sarcomas (STS) and neuroblastomas. The data on the cases included in STS treatment protocols were collected prospectively and histology was centrally reviewed; the data and histology concerning the other children were reviewed for the purpose of this analysis. All tumors occurred in the sinonasal region with bone erosion (7 patients) and intracranial (4) or intraorbital (4) extension. Three patients were in Kadish stage B, and 6 in stage C. Complete tumor resection was very difficult to achieve, but adding chemotherapy and radiotherapy enabled tumor control in 8 patients. Response to chemotherapy was evident in 5/7 evaluable cases. Radiotherapy (48.5-60 Gy) was delivered in all children but one, due to early disease progression. With a median follow-up of 13.4 years (range 9.2-22.9), 7 patients are alive in 1 st and one in 2nd complete remission. All surviving patients developed treatment-related sequelae, the most frequent being endocrine dysfunctions (4 patients) and craniofacial growth impairments (4 patients). Our findings confirm that ENB in children has an aggressive presentation, but multimodal therapy can cure most patients. Our results are encouraging but future strategies must optimize treatment in terms of survival and related morbidities

  17. European Committee for Future Accelerators

    International Nuclear Information System (INIS)

    Mulvey, John

    1983-01-01

    Nearly 21 years ago, in December 1962, Viktor Weisskopf and Cecil Powell, then respectively CERN's Director General and Chairman of the Scientific Policy Committee, called together a group of European high energy physicists to advise on steps to reach higher energy. The CERN PS had been in operation since 1959, its experimental programme was well established and the time had come to think of the future. The Chairman of the group, which later took the title 'European Committee for Future Accelerators', was Edoardo Amaldi and his influential report, presented to the CERN Council in June 1963, reviewed the whole structure and possible development of the field in the CERN Member States. Its proposals included the construction of the Intersecting Storage Rings (ISR), and of a 300 GeV proton accelerator which was then envisaged as being the major facility of a second CERN Laboratory elsewhere in Europe

  18. Design review report: AN valve pit upgrades for Project W-314, tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    Boes, K.A.

    1998-01-01

    This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314's AN Valve Pit Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314, Tank Farm Restoration and Safe Operations, is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farms' waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project's work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first package to be performed is the AN Valve Pit Upgrades package. The scope of the modifications includes new pit cover blocks, valve manifolds, leak detectors, transfer line connections (for future planned transfer lines), and special protective coating for the 241-AN-A and 241-AN-B valve pits

  19. Consensus, contracts, and committees.

    Science.gov (United States)

    Moreno, J D

    1991-08-01

    Following a brief account of the puzzle that ethics committees present for the Western Philosophical tradition, I will examine the possibility that social contract theory can contribute to a philosophical account of these committees. Passing through classical as well as contemporary theories, particularly Rawls' recent constructivist approach, I will argue that social contract theory places severe constraints on the authority that may legitimately be granted to ethics committees. This, I conclude, speaks more about the suitability of the theory to this level of analysis than about the ethics committee phenomenon itself.

  20. Compilation of reports of the Advisory Committee on Reactor Safeguards, 1957-1984. Volume 5. Generic Subjects H-R

    International Nuclear Information System (INIS)

    1985-04-01

    This six-volume compilation contains over 1000 reports prepared by the Advisory Committee on Reactor Safeguards from September 1957 through December 1984. The reports are divided into two groups: Part 1: ACRS Reports on Project Reviews, and Part 2: ACRS Reports on Generic Subjects. Part 1 contains ACRS reports alphabetized by project name and within project name by chronological order. Part 2 categorizes the reports by the most appropriate generic subject area and within subject area by chronological order. This volume presents generic subjects arranged alphabetically from H to R