WorldWideScience

Sample records for project results show

  1. QLab 3 show control projects for live performances & installations

    CERN Document Server

    Hopgood, Jeromy

    2013-01-01

    Used from Broadway to Britain's West End, QLab software is the tool of choice for many of the world's most prominent sound, projection, and integrated media designers. QLab 3 Show Control: Projects for Live Performances & Installations is a project-based book on QLab software covering sound, video, and show control. With information on both sound and video system basics and the more advanced functions of QLab such as MIDI show control, new OSC capabilities, networking, video effects, and microphone integration, each chapter's specific projects will allow you to learn the software's capabilitie

  2. Analytical results for Abelian projection

    International Nuclear Information System (INIS)

    Ogilivie, Michael C.

    1999-01-01

    Analytic methods for Abelian projection are developed, and a number of results related to string tension measurements are obtained. It is proven that even without gauge fixing, Abelian projection yields string tensions of the underlying non-Abelian theory. Strong arguments are given for similar results in the case where gauge fixing is employed. The subgroup used for projection need only contain the center of the gauge group, and need not be Abelian. While gauge fixing is shown to be in principle unnecessary for the success of Abelian projection, it is computationally advantageous for the same reasons that improved operators, e.g., the use of fat links, are advantageous in Wilson loop measurements

  3. SANA - project results and PIK contributions

    Energy Technology Data Exchange (ETDEWEB)

    Bellmann, K; Erhard, M; Flechsig, M; Grote, R; Suckow, F

    1998-03-01

    This report includes the final project results of the two groups at PIK, involved in the project: Firstly, the newly developed physiologically-based forest growth model FORSANA was applied for the first time to three pine stands, which differed largely in their air pollution and deposition history. (The evaluation of the model is presented in PIK Report 32). The model was able to explain the growth during the last decades of at least two of the three stands from the climatic and deposition conditions at the sites. The third site was shown to be exceptional with respect to its relation between dimension and age, and was supposed to be exposed to major disturbances in the past, which could not be accounted for by the model. To extrapolate from the stand level to the regional level, FORSANA was initialised with spatially explicit data from forestry inventory and soil maps. Simulations were executed with measured weather records and regional distributions of deposition and air pollution, which were estimated on the basis of emission inventories and wind directions. Different assumptions about the development of air pollution had been applied to investigate different pollution abatement strategies. The results showed that a positive effect can be expected from the actual emission reductions close the main centres of emission, but showed also that this effect is decreasing with increasing distance from the emission source. (orig./KW)

  4. Testing the robustness of Citizen Science projects: Evaluating the results of pilot project COMBER.

    Science.gov (United States)

    Chatzigeorgiou, Giorgos; Faulwetter, Sarah; Dailianis, Thanos; Smith, Vincent Stuart; Koulouri, Panagiota; Dounas, Costas; Arvanitidis, Christos

    2016-01-01

    Citizen Science (CS) as a term implies a great deal of approaches and scopes involving many different fields of science. The number of the relevant projects globally has been increased significantly in the recent years. Large scale ecological questions can be answered only through extended observation networks and CS projects can support this effort. Although the need of such projects is apparent, an important part of scientific community cast doubt on the reliability of CS data sets. The pilot CS project COMBER has been created in order to provide evidence to answer the aforementioned question in the coastal marine biodiversity monitoring. The results of the current analysis show that a carefully designed CS project with clear hypotheses, wide participation and data sets validation, can be a valuable tool for the large scale and long term changes in marine biodiversity pattern change and therefore for relevant management and conservation issues.

  5. Researchers' experience with project management in health and medical research: Results from a post-project review

    Science.gov (United States)

    2011-01-01

    Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721

  6. Recent Results from NASA's Morphing Project

    Science.gov (United States)

    McGowan, Anna-Maria R.; Washburn, Anthony E.; Horta, Lucas G.; Bryant, Robert G.; Cox, David E.; Siochi, Emilie J.; Padula, Sharon L.; Holloway, Nancy M.

    2002-01-01

    The NASA Morphing Project seeks to develop and assess advanced technologies and integrated component concepts to enable efficient, multi-point adaptability in air and space vehicles. In the context of the project, the word "morphing" is defined as "efficient, multi-point adaptability" and may include macro, micro, structural and/or fluidic approaches. The project includes research on smart materials, adaptive structures, micro flow control, biomimetic concepts, optimization and controls. This paper presents an updated overview of the content of the Morphing Project including highlights of recent research results.

  7. ADVERTISEMENTS FOR ICT PROJECT MANAGERS SHOW DIVERSITY BETWEEN SWEDISH EMPLOYERS’ AND PROJECT MANAGEMENT ASSOCIATIONS’ VIEWS OF PM CERTIFICATIONS

    Directory of Open Access Journals (Sweden)

    Siw Lundqvist

    2014-05-01

    Full Text Available Appointing ICT project managers is a delicate issue for management; not least since ICT projects are known to be unsuccessful in delivering the required product in time and on budget. Hence, it is even more important to find the “right” individual for the job. According to project management associations, certification in project management is a prerequisite for a project manager’s successful career. The appreciation of project management certifications among Swedish employers was studied using data collected from job advertisements for ICT project managers during four years (2010-2013. Judged on how the advertisements were worded the result indicates surprisingly low interest from the employers’ side, which conflicts with the project management associations statements about the certifications’ indispensable value for successful projects. Furthermore, it conflicts with a common understanding of certifications as essential for appointment as a project manager. The findings identify a possible gap between PM associations’ and employers’ views regarding the certifications’ value, and highlight the necessity of seriously considering whether it is worthwhile for the individuals to strive for, and for the organizations to promote certification, since it is costly in both time, effort and money.

  8. Transaction costs of unilateral CDM projects in India-results from an empirical survey

    International Nuclear Information System (INIS)

    Krey, Matthias

    2005-01-01

    Recently, transaction costs in the context of the Clean Development Mechanism (CDM) gained considerable attention as they were generally perceived to be significantly higher than for the other Kyoto Mechanisms. However, empirical evidence on the amount of transaction costs of CDM projects is very scarce. This paper presents the results from an empirical survey designed to quantify transaction costs of potential non-sink CDM projects in India. The definition of transaction costs of CDM projects was derived from recent literature and observations made in the current market for Certified Emission Reductions (CERs). During the survey, parts of transaction costs of 15 projects were quantified. An assessment of the results showed that specific transaction costs depend, to a large extent, on economies of scale in terms of total amount of CERs generated over the crediting period. Total transaction costs were quantified for seven projects. The costs range from 0.07 to 0.47 dollar/t CO 2 . As the projects have an emission reduction between 0.24 Mt CO 2 and 5.00 Mt CO 2 over the crediting period, the results support the assumption of Michaelowa et al. (Climate Policy 3 (2003) 273) that projects with emission reductions smaller than 0.20 Mt CO 2 are not economically viable at current CER prices

  9. 28 CFR 512.20 - Publication of results of research project.

    Science.gov (United States)

    2010-07-01

    ... project. 512.20 Section 512.20 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE GENERAL MANAGEMENT AND ADMINISTRATION RESEARCH Research § 512.20 Publication of results of research project. (a) A researcher may publish in book form and professional journals the results of any research project conducted...

  10. New results from the RD52 (DREAM) project

    International Nuclear Information System (INIS)

    Wigmans, Richard

    2013-01-01

    Simultaneous detection of the Čherenkov light and scintillation light produced in hadron showers makes it possible to measure the electromagnetic shower fraction event by event and thus eliminate the detrimental effects of fluctuations in this fraction on the performance of calorimeters. In the RD52 (DREAM) project, the possibilities of this dual-readout calorimetry are investigated and optimized. In this talk, the latest results of this project will be presented. These results concern the performance of a matrix of molybdenum doped lead tungstate crystals built for this purpose, new data on the application of the polarization of Čherenkov light in this context, and the first test results of prototype modules for the new full-scale fiber calorimeter

  11. Principal results of 'DEWAM' project implementation, Russian Federation

    International Nuclear Information System (INIS)

    Nechaev, A.F.

    2002-01-01

    This overview summarizes the key results of the four-year project 'Decontamination and Waste Management in the Course of Research Reactors Decommissioning' carried out within the framework of the IAEA's CRP 'Decommissioning Techniques for Research Reactors'. The project included two principal components: (1) info-analytical studies and development of a database system, and (2) research and development in the areas of decontamination and waste management technologies applicable to decommissioning. Details of the work are expounded in 29 publications and annual Progress Reports; the results of the study are used in corresponding university courses; and innovative technologies for radwaste processing and environmental restoration are planned to be introduced into practice. (author)

  12. Postface "The GITEWS Projectresults, summary and outlook"

    Directory of Open Access Journals (Sweden)

    U. Münch

    2011-03-01

    Full Text Available This paper reflects the experiences and results gained during the GITEWS project (German Indonesian Tsunami Early Warning System, which was funded by the Federal German Ministry of Education and Research between spring 2005 and spring 2011. Many of the individual results have been presented at international conferences and in international journals. The NHESS special issue offers a comprehensive overview of the key findings within the project and the first phase of operation of the warning system.

  13. PROJECT “5-100”: SOME INTERIM RESULTS

    Directory of Open Access Journals (Sweden)

    Г А Ключарев

    2018-12-01

    Full Text Available The tasks of modernization and development of education and science are of a key im-portance for the Russian Federation. Despite a number of significant changes in the Russian system of education and science over the last 10-15 years, the best Russian universities still cannot compete with the world leading universities. In 2013, to change this situation the state started one of its most ambitious projects to increase the international competitiveness of Russian universities, which is the project “5-100”. Though the need for such projects for the development of science and education is widely acknowledged, the “5-100” has received contradictory estimates of different stakeholders and experts. By 2017, the project approached its half-time line and spent a significant part of its resources, thus, it is time to consider its interim results. Moreover, the today’s close attention to the project determined numerous speculations not only in the media but also in scientific articles aiming to assess the project’s impact on the Russian system of education and science based on ideological and political judgments. The authors understand and accept all informed judgments but emphasize the importance of evaluating both reasons for such large-scale projects and factors affecting their implementations. A superficial estimate of the project “5-100” leads to the em-phasis on its minor disadvantages, which usually hides its less obvious positive sides. Thus, the article focuses on the role of the project “5-100” in the modernization of the Russian system of education and science, considers its different aspects, and identifies possible approaches to assess its efficiency at the final stages of its implementation (or to develop new projects to increase the international competitiveness of Russian universities.

  14. Scintilla European project, the successful research results

    Energy Technology Data Exchange (ETDEWEB)

    Sannie, G.; Kondrasov, V.; Corre, G.; Boudergui, K.; Perot, B.; Carasco, C.; Montemont, G. [Commissariat a l' energie atomique et aux energies alternatives, Saclay, Cadarache, Grenoble (France); Peerani, P.; Carrapico, C.; Tomanin, A.; Rosas, F.; Caviglia, M.; Eklund, G.; Tagziria, H. [European Commission, Joint Research Centre, ITU, Nuclear Security Unit, Ispra (Italy); Friedrich, H.; Chmel, S. [Fraunhofer-Institut fuer Naturwissenschaftlich - Technische Trendanalysen - INT, Euskirchen (Germany); De Vita, R.; Manchini, E.; Pavan, M. [Istituto Nazionale di Fisica Nucleare, Sezione di Genova, Genova (Italy); Grattarola, M.; Botta, E. [Ansaldo Nucleare S.P.A, Genova (Italy); Kovacs, A.; Lakosi, L. [Hungarian Academy of Sciences, Centre for Energy Research, Budapest (Hungary); Baumhauer, C.; Deheuninck, T.; Haddad, E. [ARTTIC, Paris (France); Petrossian, G.; Ferragut, A. [SAPHYMO, Massy (France); Dermody, G.; Crossingham, G. [Symetrica Security Ltd, Southampton (United Kingdom)

    2015-07-01

    The Scintilla FP7 project is ended in December 2014, the fruitful results of 3 years development and tests will be presented. SCINTILLA offers the capacity to finding a reliable alternative to Helium-3 based detection systems since the gas which is predominantly used in nuclear safeguards and security applications has now become very expensive, rare and nearly unavailable. SCINTILLA benchmarks results are based on international standards. Radiation Portal tests were carried out at the Joint Research Centre (JRC) in Ispra (Italy). The scintilla project addresses few mains issues. The first is to develop neutron detectors for Radiation Portal Monitor (RPM) and the second is the need of new wearable integrated solutions for Spectrometric Personal Radiation Monitor (SPRM). The partners which provide technical systems of the scintilla project are INFN-ANSALDO, CEA, SYMETRICA and SAPHYMO. For RPM, the objective is to find reliable alternatives to Helium-3 historical neutron detector and provide technical solutions which cope with tests for reliable mobile and cost effective. For Spectrometric Personal Radiation Monitor (SPRM), SCINTILLA is innovating in technology areas that offer complementary capabilities for detecting and identifying gamma, Two CZT (Cadmium Zinc Telluride) addressing contexts of used by first responder technologies, one is a wearable detector and the second is a gamma camera complemented by advanced image processing technologies. (authors)

  15. A Summary of NORA Project Results Related to Reactivity Measurements

    International Nuclear Information System (INIS)

    Berg, J.O.; Døderlein, J-M-; Haugset, K

    1969-01-01

    The NORA Project has been an international undertaking within the field of reactor physics, resulting from an agreement signed by the International Atomic Energy Agency and the Norwegian Government in April 1961, and subsequently renewed for three years in 1964 and one year in 1967. A summary of the research performed in the period 1961-1964 has been published in IAEA Technical Report Series no. 67. The Project work carried out through the years 1964-1968 will be covered in a forthcoming IAEA Technical Report. The main experimental facility used in the Project has been the zero-power reactor NORA Reactor kinetics, both experimental end theoretical, has been a major item of research in the NORA Project. The present report will briefly summarize results and conclusions considered relevant to the topic discussed by this Panel. Extensive referencing will be made to the final NORA Project Report

  16. Image restoration by the method of convex projections: part 2 applications and numerical results.

    Science.gov (United States)

    Sezan, M I; Stark, H

    1982-01-01

    The image restoration theory discussed in a previous paper by Youla and Webb [1] is applied to a simulated image and the results compared with the well-known method known as the Gerchberg-Papoulis algorithm. The results show that the method of image restoration by projection onto convex sets, by providing a convenient technique for utilizing a priori information, performs significantly better than the Gerchberg-Papoulis method.

  17. NASA Space Radiation Risk Project: Overview and Recent Results

    Science.gov (United States)

    Blattnig, Steve R.; Chappell, Lori J.; George, Kerry A.; Hada, Megumi; Hu, Shaowen; Kidane, Yared H.; Kim, Myung-Hee Y.; Kovyrshina, Tatiana; Norman, Ryan B.; Nounu, Hatem N.; hide

    2015-01-01

    The NASA Space Radiation Risk project is responsible for integrating new experimental and computational results into models to predict risk of cancer and acute radiation syndrome (ARS) for use in mission planning and systems design, as well as current space operations. The project has several parallel efforts focused on proving NASA's radiation risk projection capability in both the near and long term. This presentation will give an overview, with select results from these efforts including the following topics: verification, validation, and streamlining the transition of models to use in decision making; relative biological effectiveness and dose rate effect estimation using a combination of stochastic track structure simulations, DNA damage model calculations and experimental data; ARS model improvements; pathway analysis from gene expression data sets; solar particle event probabilistic exposure calculation including correlated uncertainties for use in design optimization.

  18. Gaseous time projection chambers for rare event detection: results from the T-REX project. I. Double beta decay

    Energy Technology Data Exchange (ETDEWEB)

    Irastorza, I.G.; Aznar, F.; Castel, J., E-mail: igor.irastorza@cern.ch, E-mail: faznar@unizar.es, E-mail: jfcastel@unizar.es [Grupo de Física Nuclear y Astropartículas, Departamento de Física Teórica, Universidad de Zaragoza, C/ P. Cerbuna 12, Zaragoza, 50009 (Spain); and others

    2016-01-01

    As part of the T-REX project, a number of R and D and prototyping activities have been carried out during the last years to explore the applicability of gaseous Time Projection Chambers (TPCs) with Micromesh Gas Structures (Micromegas) in rare event searches like double beta decay, axion research and low-mass WIMP searches. In both this and its companion paper, we compile the main results of the project and give an outlook of application prospects for this detection technique. While in the companion paper we focus on axions and WIMPs, in this paper we focus on the results regarding the measurement of the double beta decay (DBD) of {sup 136}Xe in a high pressure Xe (HPXe) TPC. Micromegas of the microbulk type have been extensively studied in high pressure Xe and Xe mixtures. Particularly relevant are the results obtained in Xe + trimethylamine (TMA) mixtures, showing very promising results in terms of gain, stability of operation, and energy resolution at high pressures up to 10 bar. The addition of TMA at levels of ∼ 1% reduces electron diffusion by up to a factor of 10 with respect to pure Xe, improving the quality of the topological pattern, with a positive impact on the discrimination capability. Operation with a medium size prototype of 30 cm diameter and 38 cm of drift (holding about 1 kg of Xe at 10 bar in the fiducial volume, enough to contain high energy electron tracks in the detector volume) has allowed to test the detection concept in realistic experimental conditions. Microbulk Micromegas are able to image the DBD ionization signature with high quality while, at the same time, measuring its energy deposition with a resolution of at least a ∼ 3% FWHM @ Q{sub ββ}. This value was experimentally demonstrated for high-energy extended tracks at 10 bar, and is probably improvable down to the ∼ 1% FWHM levels as extrapolated from low energy events. In addition, first results on the topological signature information (one straggling track ending in two

  19. Recent results from the DREAM project

    International Nuclear Information System (INIS)

    Wigmans, Richard

    2009-01-01

    The aim of the DREAM project is to develop calorimeters that are able to measure the four-vectors of all fundamental constituents of matter, including fragmenting quarks, with a precision of 1% or better. To achieve this, the factors that limit the performance of the present generation of calorimeters are eliminated one by one, in the order at which these factors dominate. In this talk, I give an overview of the results achieved so far, and outline our plans for the future.

  20. Task Listings Resulting from the Vocational Competency Measures Project. Memorandum Report.

    Science.gov (United States)

    American Institutes for Research in the Behavioral Sciences, Palo Alto, CA.

    This memorandum report consists of 14 task listings resulting from the Vocational Competency Measures Project. (The Vocational Competency Measures Project was a test development project that involved the writing and verification of task listings for 14 vocational occupational areas through over 225 interviews conducted in 27 states.) Provided in…

  1. Forecasting of Radiation Belts: Results From the PROGRESS Project.

    Science.gov (United States)

    Balikhin, M. A.; Arber, T. D.; Ganushkina, N. Y.; Walker, S. N.

    2017-12-01

    Forecasting of Radiation Belts: Results from the PROGRESS Project. The overall goal of the PROGRESS project, funded in frame of EU Horizon2020 programme, is to combine first principles based models with the systems science methodologies to achieve reliable forecasts of the geo-space particle radiation environment.The PROGRESS incorporates three themes : The propagation of the solar wind to L1, Forecast of geomagnetic indices, and forecast of fluxes of energetic electrons within the magnetosphere. One of the important aspects of the PROGRESS project is the development of statistical wave models for magnetospheric waves that affect the dynamics of energetic electrons such as lower band chorus, hiss and equatorial noise. The error reduction ratio (ERR) concept has been used to optimise the set of solar wind and geomagnetic parameters for organisation of statistical wave models for these emissions. The resulting sets of parameters and statistical wave models will be presented and discussed. However the ERR analysis also indicates that the combination of solar wind and geomagnetic parameters accounts for only part of the variance of the emissions under investigation (lower band chorus, hiss and equatorial noise). In addition, advances in the forecast of fluxes of energetic electrons, exploiting empirical models and the first principles IMPTAM model achieved by the PROGRESS project is presented.

  2. A change in strategy for a CERCLA Removal Action Demolition Project in progress results in overall project enhancements

    International Nuclear Information System (INIS)

    Albertin, M.; Nichols, R.M.; Edwards, D.T.

    1995-01-01

    This paper discusses changes made in a demolition project at the Fernald Environmental Management Project (FEMP), a site on the National Priorities list (NPL), owned by the Department of Energy. The project, to demolish fourteen uranium ore silos and their structure, was based on a Removal Action Work Plan, submitted and approved by the United States Environmental Protection Agency (USEPA), that integrated Comprehensive Environmental Response Compensation and Liability Act (CERCLA) requirements to remove the source of contamination and threat to public health and the environment. After the demolition contractor defaulted at 30% complete, completion of the project by the USEPA deadline was threatened. The recovery plan included re-evaluation of project documents in addition to the schedule. It was determined that re-interpretation of the removal action criteria, including design and Removal Action Work Plan, would eliminate road-blocks, and optimize resources, resulting in project completion by the original deadline even after lost-time in mobilizing another contractor. This presentation will discuss the open-quotes lessons learnedclose quotes by the project team and illustrate how simplification of construction methods resulted in enhancements to the environmental controls, improved material handing, and created a safer work environment

  3. Recent Results from the SAFIR Project

    Directory of Open Access Journals (Sweden)

    M. Sánchez-Portal

    2014-12-01

    Full Text Available The "Seyfert and star formation Activity in the Far-Infrared" (SAFIR project is aimed at studying the physical nature of the nuclear IR emission and star formation properties of a small sample of nearby Seyfert galaxies observed with the PACS and SPIRE instruments on board the Herschel space observatory. In this paper, we review the achieved results, that reveal the importance of the far-IR range to improve the quality and reliability of the estimates of basic AGN torus parameters, and describe some preliminary outcome from the on-going work on the dust properties of resolved AGN host galaxies.

  4. Small scale renewable solar energy and the best result project

    Energy Technology Data Exchange (ETDEWEB)

    Bilbao, J.; Miguel, A.H.; Perez-Burgos, A.M. [Valladolid Univ. (Spain)

    2008-07-01

    The European Community has established programmes with different Projects in relation with the develop of an energy system according to de Kyoto objectives, improving energy efficiency, maintaining security supply and doubling the share of renewable energy use. The Best Result Project (Building and Energy Systems and Technology in Renewable Energy Sources Update and Linked Training), is financed by the European Commission, Intelligent Energy Agency (EIE) and the project objectives are to develop training and diffusion activities in the field of Renewable Energy Technology. The project aims to raise the renewable energy knowledge among suppliers and general public. The project activities are: basis and specialized training events, workshops, meetings, visits and e-learning common platform. The final objective is to extend the market of small scale RES applications in the building and energy sector through common and local activities addressing RES suppliers and consumers. (orig.)

  5. [Adverse events management. Methods and results of a development project].

    Science.gov (United States)

    Rabøl, Louise Isager; Jensen, Elisabeth Brøgger; Hellebek, Annemarie H; Pedersen, Beth Lilja

    2006-11-27

    This article describes the methods and results of a project in the Copenhagen Hospital Corporation (H:S) on preventing adverse events. The aim of the project was to raise awareness about patients' safety, test a reporting system for adverse events, develop and test methods of analysis of events and propagate ideas about how to prevent adverse events. H:S developed an action plan and a reporting system for adverse events, founded an organization and developed an educational program on theories and methods of learning from adverse events for both leaders and employees. During the three-year period from 1 January 2002 to 31 December 2004, the H:S staff reported 6011 adverse events. In the same period, the organization completed 92 root cause analyses. More than half of these dealt with events that had been optional to report, the other half events that had been mandatory to report. The number of reports and the front-line staff's attitude towards reporting shows that the H:S succeeded in founding a safety culture. Future work should be centred on developing and testing methods that will prevent adverse events from happening. The objective is to suggest and complete preventive initiatives which will help increase patient safety.

  6. Planned and ongoing projects (pop) database: development and results.

    Science.gov (United States)

    Wild, Claudia; Erdös, Judit; Warmuth, Marisa; Hinterreiter, Gerda; Krämer, Peter; Chalon, Patrice

    2014-11-01

    The aim of this study was to present the development, structure and results of a database on planned and ongoing health technology assessment (HTA) projects (POP Database) in Europe. The POP Database (POP DB) was set up in an iterative process from a basic Excel sheet to a multifunctional electronic online database. The functionalities, such as the search terminology, the procedures to fill and update the database, the access rules to enter the database, as well as the maintenance roles, were defined in a multistep participatory feedback loop with EUnetHTA Partners. The POP Database has become an online database that hosts not only the titles and MeSH categorizations, but also some basic information on status and contact details about the listed projects of EUnetHTA Partners. Currently, it stores more than 1,200 planned, ongoing or recently published projects of forty-three EUnetHTA Partners from twenty-four countries. Because the POP Database aims to facilitate collaboration, it also provides a matching system to assist in identifying similar projects. Overall, more than 10 percent of the projects in the database are identical both in terms of pathology (indication or disease) and technology (drug, medical device, intervention). In addition, approximately 30 percent of the projects are similar, meaning that they have at least some overlap in content. Although the POP DB is successful concerning regular updates of most national HTA agencies within EUnetHTA, little is known about its actual effects on collaborations in Europe. Moreover, many non-nationally nominated HTA producing agencies neither have access to the POP DB nor can share their projects.

  7. The CGEM-IT of the BESIII experiment: project update and test results in magnetic field

    Science.gov (United States)

    Mezzadri, G.

    2016-08-01

    The BESIII experiment is a multi-purpose detector operating on the electron- positron collider BEPCII in Beijing. Since 2008, the world's largest sample of J/ψ, ψ’ were collected. Due to increasing luminosity, the inner drift chamber is showing signs of aging. In 2014, an upgrade was proposed by the Italian collaboration based on the Cylindrical Gas Electron Multipliers (CGEM) technology, developed within the KLOE-II experiment, but with several new features and innovations. In this contribution, an overview of the project will be presented. Preliminary results of a beam test will be shown, with particular focus on the detector performance in magnetic field, with different configurations of electric field. A new readout mode, the µTPC readout, will also be described. The project has been recognized as a Significant Research Project within the Executive Programme for Scientific and Technological Cooperation between Italy and P.R.C for the years 2013-2015, and more recently has been selected as one of the project funded by the European Commission within the call H2020- MSCA-RISE-2014.

  8. Dark Matter Time Projection Chamber : Recent R&D Results

    Science.gov (United States)

    Battat, J. B. R.; Ahlen, S.; Chernicoff, M.; Deaconu, C.; Dujmic, D.; Dushkin, A.; Fisher, P.; Henderson, S.; Inglis, A.; Kaboth, A.; Kirsch, L.; Lopez, J. P.; Monroe, J.; Ouyang, H.; Sciolla, G.; Tomita, H.; Wellenstein, H.

    2012-02-01

    The Dark Matter Time Projection Chamber collaboration recently reported a dark matter limit obtained with a 10 liter time projection chamber filled with CF4 gas. The 10 liter detector was capable of 2D tracking (perpendicular to the drift direction) and 2D fiducialization, and only used information from two CCD cameras when identifying tracks and rejecting backgrounds. Since that time, the collaboration has explored the potential benefits of photomultiplier tube and electronic charge readout to achieve 3D tracking, and particle identification for background rejection. The latest results of this effort is described here.

  9. Results of the ITER toroidal field model coil project

    International Nuclear Information System (INIS)

    Salpietro, E.; Maix, R.

    2001-01-01

    In the scope of the ITER EDA one of the seven largest projects was devoted to the development, manufacture and testing of a Toroidal Field Model Coil (TFMC). The industry consortium AGAN manufactured the TFMC based on on a conceptual design developed by the ITER EDA EU Home Team. The TFMC was completed and assembled in the test facility TOSKA of the Forschungszentrum Karlsruhe in the first half of 2001. The first testing phase started in June 2001 and lasted till October 2001. The first results have shown that the main goals of the project have been achieved

  10. Initial communication survey results for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Beck, D.M.

    1991-03-01

    To support the public communication efforts of the Technical Steering Panel of the Hanford Environmental Dose Reconstruction (HEDR) Project, a public survey was conducted. The survey was intended to provide information about the public's knowledge and interest in the project and the best ways to communicate project results. Questions about the project were included as part of an omnibus survey conducted by Washington State University. The survey was conducted by phone to Washington State residents in the spring of 1990. This report gives the HEDR-related questions and summary data of responses. Questions associated with the HEDR Project were grouped into four categories: knowledge of the HEDR Project; interest in the project; preferred ways of receiving information about the project (including public information meetings, a newsletter mailed to homes, presentations to civic groups in the respondent's community, a computer bulletin board respondent could access with a modem, information displays at public buildings and shopping malls, and an information video sent to respondent); and level of concern over past exposure from Hanford operations. Questions abut whom state residents are most likely to trust about radiation issues were also part of the omnibus survey, and responses are included in this report

  11. Lesion insertion in the projection domain: Methods and initial results

    International Nuclear Information System (INIS)

    Chen, Baiyu; Leng, Shuai; Yu, Lifeng; Yu, Zhicong; Ma, Chi; McCollough, Cynthia

    2015-01-01

    Purpose: To perform task-based image quality assessment in CT, it is desirable to have a large number of realistic patient images with known diagnostic truth. One effective way of achieving this objective is to create hybrid images that combine patient images with inserted lesions. Because conventional hybrid images generated in the image domain fails to reflect the impact of scan and reconstruction parameters on lesion appearance, this study explored a projection-domain approach. Methods: Lesions were segmented from patient images and forward projected to acquire lesion projections. The forward-projection geometry was designed according to a commercial CT scanner and accommodated both axial and helical modes with various focal spot movement patterns. The energy employed by the commercial CT scanner for beam hardening correction was measured and used for the forward projection. The lesion projections were inserted into patient projections decoded from commercial CT projection data. The combined projections were formatted to match those of commercial CT raw data, loaded onto a commercial CT scanner, and reconstructed to create the hybrid images. Two validations were performed. First, to validate the accuracy of the forward-projection geometry, images were reconstructed from the forward projections of a virtual ACR phantom and compared to physically acquired ACR phantom images in terms of CT number accuracy and high-contrast resolution. Second, to validate the realism of the lesion in hybrid images, liver lesions were segmented from patient images and inserted back into the same patients, each at a new location specified by a radiologist. The inserted lesions were compared to the original lesions and visually assessed for realism by two experienced radiologists in a blinded fashion. Results: For the validation of the forward-projection geometry, the images reconstructed from the forward projections of the virtual ACR phantom were consistent with the images physically

  12. Lesion insertion in the projection domain: Methods and initial results

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Baiyu; Leng, Shuai; Yu, Lifeng; Yu, Zhicong; Ma, Chi; McCollough, Cynthia, E-mail: mccollough.cynthia@mayo.edu [Department of Radiology, Mayo Clinic, Rochester, Minnesota 55905 (United States)

    2015-12-15

    Purpose: To perform task-based image quality assessment in CT, it is desirable to have a large number of realistic patient images with known diagnostic truth. One effective way of achieving this objective is to create hybrid images that combine patient images with inserted lesions. Because conventional hybrid images generated in the image domain fails to reflect the impact of scan and reconstruction parameters on lesion appearance, this study explored a projection-domain approach. Methods: Lesions were segmented from patient images and forward projected to acquire lesion projections. The forward-projection geometry was designed according to a commercial CT scanner and accommodated both axial and helical modes with various focal spot movement patterns. The energy employed by the commercial CT scanner for beam hardening correction was measured and used for the forward projection. The lesion projections were inserted into patient projections decoded from commercial CT projection data. The combined projections were formatted to match those of commercial CT raw data, loaded onto a commercial CT scanner, and reconstructed to create the hybrid images. Two validations were performed. First, to validate the accuracy of the forward-projection geometry, images were reconstructed from the forward projections of a virtual ACR phantom and compared to physically acquired ACR phantom images in terms of CT number accuracy and high-contrast resolution. Second, to validate the realism of the lesion in hybrid images, liver lesions were segmented from patient images and inserted back into the same patients, each at a new location specified by a radiologist. The inserted lesions were compared to the original lesions and visually assessed for realism by two experienced radiologists in a blinded fashion. Results: For the validation of the forward-projection geometry, the images reconstructed from the forward projections of the virtual ACR phantom were consistent with the images physically

  13. Results of Needs Assessments Related to Citizen Science Projects

    Science.gov (United States)

    Buxner, Sanlyn; Bracey, Georgia; Glushko, Anna; Bakerman, Maya; Gay, Pamela L.; CosmoQuest Team

    2017-01-01

    The CosmoQuest Virtual Research Facility invites the public and classrooms to participate in NASA Science Mission Directorate related research that leads to publishable results and data catalogues. One of the main goals of the project is to support professional scientists in doing science and the general public--including parents, children, teachers, and students--in learning and doing science. Through the effort, the CosmoQuest team is developing a variety of supports and opportunities to support the doing and teaching of science. To inform our efforts, we have implemented a set of needs surveys to assess the needs of our different audiences. These surveys are being used to understand the interests, motivations, resources, challenges and demographics of our growing CosmoQuest community and others interested in engaging in citizen science projects. The surveys include those for teachers, parents, adult learners, planetarium professionals, subject matter experts (SMEs), and the general public. We will share the results of these surveys and discuss the implications of the results for broader education and outreach programs.

  14. Results of the Italian neuART project

    International Nuclear Information System (INIS)

    Re, A; Albertin, F; Brancaccio, R; Cotto, G; Dughera, G; Durisi, E; Ferrarese, W; Lo Giudice, A; Mereu, P; Mila, G; Pastrone, N; Prino, F; Bortolin, C; Corsi, J; Buscaglia, P; Giovagnoli, A; Grassi, N; Nervo, M; Gambaccini, M; Petrucci, F

    2012-01-01

    The neu A RT project aims at developing state of the art transmission imaging and computed tomography techniques, applied to art objects, by using neutrons as well as more conventional X-rays. In this paper a facility for digital X-ray radiography of large area paintings on canvas or wooden panels and for the X-ray tomography of large size wooden artifacts, recently installed in a protected area, is presented. The results of a K-edge radiography facility that will soon be installed in the same area are also shown.

  15. Gun Shows and Gun Violence: Fatally Flawed Study Yields Misleading Results

    Science.gov (United States)

    Hemenway, David; Webster, Daniel; Pierce, Glenn; Braga, Anthony A.

    2010-01-01

    A widely publicized but unpublished study of the relationship between gun shows and gun violence is being cited in debates about the regulation of gun shows and gun commerce. We believe the study is fatally flawed. A working paper entitled “The Effect of Gun Shows on Gun-Related Deaths: Evidence from California and Texas” outlined this study, which found no association between gun shows and gun-related deaths. We believe the study reflects a limited understanding of gun shows and gun markets and is not statistically powered to detect even an implausibly large effect of gun shows on gun violence. In addition, the research contains serious ascertainment and classification errors, produces results that are sensitive to minor specification changes in key variables and in some cases have no face validity, and is contradicted by 1 of its own authors’ prior research. The study should not be used as evidence in formulating gun policy. PMID:20724672

  16. Results from a survey of the South African GISc community show ...

    African Journals Online (AJOL)

    Serena Coetzee

    the GISc community fulfil roles of data analysis and interpretation, together with data ... The remainder of the article is structured as follows: related work is briefly ...... 2. Analysis design. 3. Project definition. Geospatial information systems,.

  17. King County Metro Battery Electric Bus Demonstration: Preliminary Project Results

    Energy Technology Data Exchange (ETDEWEB)

    2017-05-22

    The U.S. Federal Transit Administration (FTA) funds a variety of research projects that support the commercialization of zero-emission bus technology. To evaluate projects funded through these programs, FTA has enlisted the help of the National Renewable Energy Laboratory (NREL) to conduct third-party evaluations of the technologies deployed under the FTA programs. NREL works with the selected agencies to evaluate the performance of the zero-emission buses compared to baseline conventional buses in similar service. The evaluation effort will advance the knowledge base of zero-emission technologies in transit bus applications and provide 'lessons learned' to aid other fleets in incrementally introducing next generation zero-emission buses into their operations. This report provides preliminary performance evaluation results from a demonstration of three zero-emission battery electric buses at King County Metro in King County, Washington. NREL developed this preliminary results report to quickly disseminate evaluation results to stakeholders. Detailed evaluation results will be published in future reports.

  18. Project Oriented Immersion Learning: Method and Results

    DEFF Research Database (Denmark)

    Icaza, José I.; Heredia, Yolanda; Borch, Ole M.

    2005-01-01

    A pedagogical approach called “project oriented immersion learning” is presented and tested on a graduate online course. The approach combines the Project Oriented Learning method with immersion learning in a virtual enterprise. Students assumed the role of authors hired by a fictitious publishing...... house that develops digital products including e-books, tutorials, web sites and so on. The students defined the problem that their product was to solve; choose the type of product and the content; and built the product following a strict project methodology. A wiki server was used as a platform to hold...

  19. Results of pilot project on introducing quality control of mammographic equipment

    International Nuclear Information System (INIS)

    Vasileva, Zh.; Lichev, A.; Dimov, A.; Kostova, E.; Dimov, G.

    2003-01-01

    Objective:The results from a pilot project, realized in the framework of the PHARE Project 'Radiation Protection and Safety in Medical Use of the Ionizing Radiation'. The main goal of the project is the elaboration a quality control program for mammographic equipment and its implementation in 4 radiological units in the country. Another task is to examine the possibility for conducting a mammographic screening using this equipment. Material and methods: The developed quality control program has the following components: test parameters; criteria for intervention; minimal frequency of measurement. Methodologies for measurement of the parameters and assessment of the results in accordance with the European Protocol for physical and technical aspects of the mammographic screening. Standard protocols have been elaborated. Results: The quality program has been tested for three month at different hospitals. Conclusions: Optimization and strict control of the process of film development are needed. The exposure equipment. The quality control program should be implemented on all mammographic equipment in the country. For the performance of mammographic screening a strict selection of the equipment is necessary

  20. Results of nine Connecticut Cancer Partnership implementation projects.

    Science.gov (United States)

    Morra, Marion E; Mowad, Linda Z; Hogarty, Lucinda Hill; Kettering, Shiu-Yu

    2012-01-01

    The Connecticut Cancer Partnership (Partnership), through funds from the Connecticut legislature, the AttorneyGeneral Fund and some limited federal funding, has spearheaded the implementation of a series of projects by Connecticut institutions and State of Connecticut departments. Among them are projects in prevention, detection, treatment, survivorship and end-of-life care, along with programs that target ethnic and uninsured populations. This article highlights funding sources, procedures for choosing projects and summaries for nine completed projects of interest to practicing physicians. It also includes a listing of additional projects currently underway. The use of shared funding among the State's partners highlights the energy of the Partnership in carrying out the common vision embodied in the Connecticut Cancer Plan.

  1. JRC/IE support activities to PHARE nuclear safety programmes. Dissemination of PHARE project results

    International Nuclear Information System (INIS)

    Ranguelova, V.; Pla, P.; Rieg, C.; Bieth, M.

    2005-01-01

    Nuclear safety in Europe is one of European Union's primary concerns, therefore the European Union decided to take a prominent role to help the New Independent States and countries of Central and Eastern Europe to ensure the safety of their nuclear reactors. The European Union TACIS and PHARE programmes in nuclear safety have been undertaken since 1990. The European Commission's Directorate General External Relations (EC DG RELEX) and, Directorate General Europe Aid Co-operation Office (EC DG AIDCO), are responsible for programming and management of implementation of TACIS projects. Directorate General Enlargement (EC DG ELARG) is responsible for programming PHARE programmes, but implementation of most projects has been decentralised since 1999 budget year to the Beneficiary countries. DG ELARG acts as backstopping for the relevant EC Delegations. In these activities, the TSSTP Unit at the JRC/IE in Petten, The Netherlands, is a technical and scientific adviser of DG RELEX and DG AIDCO and provides support to DG ELARG for very specific technical issues. Several PHARE projects aiming at improving nuclear safety have been successfully implemented for a number of plants from Central and Eastern Europe. In some cases major safety issues have been addressed by means of multi-country projects and results have been disseminated to the rest of the nuclear community. Although a lot of information has been exchanged at a bilateral level, further effort is needed to collect the project results in a systematic way and make them available by means of the internet. At present the TSSTP Unit is implementing two projects for dissemination of PHARE project results. This activity will take a better advantage of today's communication technologies and ensure the management of the acquired knowledge through preservation and user-friendly access and retrieval of the project results. The paper provides an outline of the TSSTP Unit relevant knowledge preservation initiative, a description

  2. Summary of personal neutron dosemeter results obtained within the EVIDOS project

    International Nuclear Information System (INIS)

    Luszik-Bhadra, M.; Reginatto, M.; Schuhmacher, H.; Bolognese-Milsztajn, T.; Lacoste, V.; Boschung, M.; Fiechtner, A.; Coeck, M.; Vanhavere, F.; Curzio, G.; Errico d', F.; Kylloenen, J.-E.; Lindborg, L.; Bartlett, D.; Tanner, R.

    2005-01-01

    Full text: Within the EC project EVIDOS ('Evaluation of Individual Dosimetry in Mixed Neutron and Photon Radiation Fields'), different types of neutron personal dosemeters were irradiated in workplace fields in nuclear installations in Europe. Mostly electronic personal neutron dosemeters were tested, among them commercial devices (Thermo Electron EPD-N, Aloka PDM-313), devices from first industrial prototype series (Thermo Electron EPD-N2, Saphydose-n) and laboratory prototypes which were already in the stage of lightweight battery-operated instruments (PTB DOS-2002). In addition, dosemeters with (almost) immediate readout (BTI bubble detectors, Rados DIS-N) and passive dosemeters which needed no fielddependent calibration factors (PADC track detectors from PSI and NRPB) were used, as well as those TLD albedo dosemeters which are routinely used in the facilities visited. The results of measurements obtained within the EVIDOS project in workplace fields in nuclear installations in Europe, i.e. at Kruemmel (boiling water reactor, transport cask), at Mol (Venus research reactor, fuel facility Belgonucleaire) and at Ringhals (pressurized water reactor, transport cask) are presented and compared to reference values of personal dose equivalent H p (10) determined by means of Bonner spheres and novel directional spectrometers. In fields with strong back-scatter and moderation of neutrons, several dosemeters showed overreadings by more than a factor of two. In strongly directed fields with neutron dose equivalent peaked at about 1 MeV (MOX fuel), the same dosemeters showed under-readings of about a factor of two. These under- and over-readings in the workplace fields can be explained in terms of the dosemeter response functions for mono-energetic neutrons, which show over-responses in the thermal and intermediate neutron energy region and under-responses at about 1 MeV neutron energy. The dosemeter readings obtained in the workplace fields were checked for consistency by

  3. Influence of consumers' cognitive style on results from projective mapping.

    Science.gov (United States)

    Varela, Paula; Antúnez, Lucía; Berget, Ingunn; Oliveira, Denize; Christensen, Kasper; Vidal, Leticia; Naes, Tormod; Ares, Gastón

    2017-09-01

    Projective mapping (PM), one of the most holistic product profiling methods in approach, is increasingly being used to uncover consumers' perception of products and packages. Assessors rely on a process of synthesis for evaluating product information, which would determine the relative importance of the perceived characteristics they use for mapping them. Individual differences are expected, as participants are not instructed on the characteristics to consider for evaluating the degree of difference among samples, generating different perceptual spaces. Individual differences in cognitive style can affect synthesis processes and thus their perception of similarities and differences among samples. In this study, the influence of the cognitive style in the results of PM was explored. Two consumer studies were performed, one aimed at describing intrinsic sensory characteristics of chocolate flavoured milk and the other one looking into extrinsic (package only) of blueberry yogurts. Consumers completed the wholistic-analytic module of the extended Verbal Imagery Cognitive Styles Test & Extended Cognitive Style Analysis-Wholistic Analytic Test, to characterize their cognitive style. Differences between wholistic and analytic consumers in how they evaluated samples using projective mapping were found in both studies. Analytics separated the samples more in the PM perceptual space than wholistic consumers, showing more discriminating abilities. This may come from a deeper analysis of the samples, both from intrinsic and extrinsic point of views. From a sensory perspective (intrinsic), analytic consumers relied on more sensory characteristics, while wholistic mainly discriminated samples according to sweetness and bitterness/chocolate flavour. In the extrinsic study however, even if analytic consumers discriminated more between packs, they described the products using similar words in the descriptive step. One important recommendation coming from this study is the need to

  4. [Review and analysis of the review results of Taiwan nurses association nursing projects (2011~2013)].

    Science.gov (United States)

    Chang, Li-Yin; Chen, Yu-Chih; Huang, Kuang-Chi; Huang, Jui-Lan; Lee, Tso-Ying

    2015-04-01

    Nursing projects are a key part of N4 professional competency training for nursing personnel. Low passage rates for these projects have been shown to negatively affect the intent of nursing personnel to advance further in the nursing ladder system. This study analyzes the scores for nursing projects between 2011 and 2013, the passage rate for these projects, and the differences in passage rates between different types of projects. This retrospective and descriptive study collected data on nursing projects conducted under the auspices of the Taiwan Nurses Association between 2011 and 2013. Furthermore, the comments of reviewers on 100 nursing projects were randomly selected and subjected to content analysis. A total of 3,359 nursing projects were examined. Eliminating unqualified nursing projects left a total of 3,246 projects for the dataset. A total of 1,099 projects were scored with passing grades, giving a passing rate of 33.9%. The authors of these passing projects worked primarily in northern Taiwan, worked in medical centers, and worked in intensive care departments. The projects submitted by authors in central Taiwan had the highest average score and passing rate, while those living in offshore islands had the lowest average score and passing rate. Most of the project topics belonged to the category: "improvement of nursing service skills or quality" (77.3%). Items with the lowest scores were: validation of questions, analysis of the current situation, and evaluation of results. The topics of nursing projects did not relate significantly to passing rate. However, years of experience, geographic location of hospital, level of institution, and department each had a statistically significant impact on the passage rate. A content analysis of reviewer comments was used to extract common problems. Most of the positive comments were related to the category of "literature review and reference", while most of the negative comments were related to the categories of

  5. The Young Solar Analogs Project: Initial Photometric Results

    Science.gov (United States)

    Saken, Jon M.; Gray, R. O.; Corbally, C. J.

    2013-06-01

    Since 2007 we have been conducting spectroscopic monitoring of the Ca II H & K lines and G-band for a sample of 31 YSAs in order to better understand their activity cycles and variations, as well as the effects of young stars on their solar systems. The targets cover the spectral range of stars most likely to contain Earth analogs, F8-K2, and a broad enough range of ages, 0.3 Gyr - 1.5 Gyr, to investigate how activity level changes with stellar age. These studies are already showing possible evidence for activity cycles, large variations in starspot activity, and flaring events. In order to obtain a more complete picture of the nature of the stars' activity and examine the correlations between stellar brightness and chromospheric activity, we have started a complimentary campaign of photometric monitoring of these targets in Johnson B, V, and R, Stromgren v and H-alpha, with the use of a small robotic telescope dedicated to this project. This poster will present some results from the first year of photometric monitoring, focusing on the correlations between the photometric bands, and between the photometric and spectroscopic data, as well as an investigation of short-term (1-2 minutes) spectroscopic variations using data obtained earlier this year on the 1.8 m Vatican Advanced Technology Telescope (VATT).

  6. Results Without Authority Controlling a Project When the Team Doesn't Report to You

    CERN Document Server

    KENDRICK, Tom

    2012-01-01

    It's tricky enough to spearhead a big project when you're the boss. But when you're the leader of a team of people who don't report to you, the obstacles are even greater. Results Without Authority is the definitive book for project managers looking to establish credibility and control. A groundbreaker in the field, it supplies a start-to-finish system for getting successful project results from cross-functional, outsourced, and other types of teams. The completely updated second edition includes new information on: * Agile methods and evolving project management tools * Strategies for working

  7. Q-Sync Motors in Commercial Refrigeration. Preliminary Test Results and Projected Benefits

    Energy Technology Data Exchange (ETDEWEB)

    Fricke, Brian A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Becker, Bryan R. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-09-01

    This report provides background information on various fractional-horsepower electric motor technologies, summarizes initial data from a DOE-sponsored Q-Sync motor demonstration project, and extrapolates that data to project the potential economic and environmental benefits resulting from upgrading the current installed base of 9–12 W evaporator fan motors to Q-Sync motors.

  8. Implementation of the Hungarian RW management project: Results and lessons

    International Nuclear Information System (INIS)

    Vigassy, J.; Czoch, I.; Ormai, P.

    1995-01-01

    In 1993, a National RW Management Project was launched to solve handling and disposal of LLW/ILW of the Paks Nuclear Power Plant and to elaborate a complex strategy for the management of radwastes from the NPP, including HLW, spent fuel and wastes from the decommissioning. It was intended to implement the project so as to have selected the possible site (or sites) for the LLW/ILW waste repository by 1996. This paper describes the first results of the nation-wide screening for suitable areas and the problems related to the comparative evaluation process to select potential sites for a surface or geological LLW/ILW disposal facility. International tenders were issued to find the most appropriate technology to reduce the quantity of liquid and solid radwaste in the Nuclear Power Plant. Their results will provide a better basis for planning the characteristics and quantity of radwaste. The applications revealed that supercompacting can be ordered as a service when the need arises, and thus it was possible to re-allocate the funding originally foreseen for the equipment to treat solid wastes. Great importance is attached in the Project to public acceptance and PR activity. An expert organization was selected in a two-phase bidding process, and it was decided that detailed exploration of a potential site will take place only if public acceptance is assured. The original program of the Hungarian RW Management Project was extended in 1994 to perform on-site underground investigations (with Canadian support) in a silt-stone formation. The first results confirm that this is a potential site for deep geological disposal of HLW. The financial and legal framework of the RW management is also to be solved. The new law on nuclear energy -- now in preparation -- will deal with that problem in one of its most important chapters, defining the responsibilities for RW management and the sources of funding

  9. Preliminary results on the cryogenic target for FIREX project

    International Nuclear Information System (INIS)

    Iwamoto, A.; Maekawa, R.; Mito, T.; Okamoto, M.; Motojima, O.; Nakai, M.; Norimatsu, T.; Nagai, K.

    2006-01-01

    Preliminary tests on the cryogenic target for the fast ignition realization experiment (FIREX) project has been conducted. A foam shell method is proposed to realize its target design. A foam target consists of three parts: a foam shell, a conical laser guide and a liquid or gas feeder made of glass. The shell is a hollow sphere (500 μm in diameter) with a uniform and thin foam layer (about 20 μm in thickness). Epoxy resin is utilized to assemble the parts into the target. Liquid fuel is fed into the shell by the feeder and is soaked up by the foam material through capillarity. The fuel is then solidified. Regarding target fabrication, one of the concerns is the influence on various thermal contractions from the different materials when it is cooled down to cryogenic environment. This paper describes the result on the validity check at cryogenic environment and the demonstration of H 2 liquefaction using a dummy target instead of the foam target. Judging from these results, the target assembled in the same process as the dummy target is sure to be practicable for the FIREX project. (authors)

  10. MODIL cryocooler producibility demonstration project results

    International Nuclear Information System (INIS)

    Cruz, G.E.; Franks, R.M.

    1993-01-01

    The production of large quantities of spacecraft needed by SDIO will require a cultural change in design and production practices. Low rates production and the need for exceedingly high reliability has driven the industry to custom designed, hand crafted, and exhaustively tested satellites. These factors have mitigated against employing design and manufacturing cost reduction methods commonly used in tactical missile production. Additional challenges to achieving production efficiencies are presented by the SDI spacecraft mission requirement. IR sensor systems, for example, are comprised of subassemblies and components that require the design, manufacture, and maintenance of ultra precision tolerances over challenging operational lifetimes. These IR sensors demand the use of reliable, closed loop, cryogenic refrigerators or active cryocoolers to meet stringent system acquisition and pointing requirements. The authors summarize some spacecraft cryocooler requirements and discuss observations regarding Industry's current production capabilities of cryocoolers. The results of the Lawrence Livermore National Laboratory (LLNL) Spacecraft Fabrication and Test (SF and T) MODIL's Phase I producibility demonstration project is presented

  11. Michigan Oncology Medical Home Demonstration Project: First-Year Results.

    Science.gov (United States)

    Kuntz, Gordon; Tozer, Jane; Snegosky, Jeff; Fox, John; Neumann, Kurt

    2014-03-01

    The Michigan Oncology Medical Home Demonstration Project (MOMHDP) is an innovative multipractice oncology medical home model, supported by payment reform. Sponsored by Priority Health, Physician Resource Management, and ION Solutions, MOMHDP includes four oncology practices and 29 physicians. Oncology practices used existing technologies, with MOMHDP providing evidence-based treatment guideline selection and compliance tracking, automated physician order entry, a patient portal, symptom management/standardized nurse triage, and advance care planning. To support changes in care and administrative models and to focus on quality, MOMHDP modifies provider payments. The program replaces the average sales price payment methodology with a drug acquisition reimbursement plus a care management fee, calculated to increase total drug reimbursement. Additionally, it reimburses for chemotherapy and treatment planning and advance care planning consultation. There is also a shared savings opportunity. MOMHDP will be enhanced in its second year to include a survivorship program, patient distress screening, imaging guidelines, and standardized patient satisfaction surveys. Priority Health patients receiving chemotherapy for a cancer diagnosis were recruited to the program. Results for this group were compared with a control group of patients from a prior period. In addition to the financial results, the project also accomplished the following: (1) adherence to practice-selected guidelines, (2) institution of advance care planning, (3) effective and standardized symptom management; and (4) payment reform. We have identified a number of critical success factors: strong payer/provider collaboration built on trust through transparent use and cost data; timing of clinical standardization must come from the practices, so they can effectively absorb new approaches; having comprehensive, written program documentation and consistently applied training facilitate practice understanding

  12. Sustainable manure management in the Baltic Sea Region - results, cases and project recommendations

    DEFF Research Database (Denmark)

    Tybirk, Knud; Luostarinen, S; Hamelin, Lorie

    This magazine contains the major results, conclusions and recommendations of the project Baltic Forum for Innovative Technologies for Sustainable Manure Management (Baltic Manure) which via co-funding from Interreg Baltic Sea Region programme has been a Flagship project in the EU Strategy...

  13. FixO3 project results, legacy and module migration to EMSO

    Science.gov (United States)

    Lampitt, Richard

    2017-04-01

    The fixed point open ocean observatory network (FixO3) project is an international project aimed at integrating in a single network all fixed point open ocean observatories operated by European organisations and to harmonise and coordinate technological, procedural and data management across the stations. The project is running for four years since September 2013 with 29 partners across Europe and a budget of 7M Euros and is now coming to its final phase. In contrast to several past programmes, the opportunity has arisen to ensure that many of the project achievements can migrate into the newly formed European Multidisciplinary Seafloor and water column Observatory (EMSO) research infrastructure. The final phase of the project will focus on developing a strategy to transfer the results in an efficient way to maintain their relevance and maximise their use. In this presentation, we will highlight the significant achievements of FixO3 over the past three years focussing on the modules which will be transferred to EMSO in the coming 9 months. These include: 1. Handbook of best practices for operating fixed point observatories 2. Metadata catalogue 3. Earth Virtual Observatory (EarthVO) for data visualisation and comparison 4. Open Ocean Observatory Yellow Pages (O3YP) 5. Training material for hardware, data and data products used

  14. Donor-funded project's sustainability assessment: a qualitative case study of a results-based financing pilot in Koulikoro region, Mali.

    Science.gov (United States)

    Seppey, Mathieu; Ridde, Valéry; Touré, Laurence; Coulibaly, Abdourahmane

    2017-12-08

    Results-based financing (RBF) is emerging as a new alternative to finance health systems in many African countries. In Mali, a pilot project was conducted to improve demand and supply of health services through financing performance in targeted services. No study has explored the sustainability process of such a project in Africa. This study's objectives were to understand the project's sustainability process and to assess its level of sustainability. Sustainability was examined through its different determinants, phases, levels and contexts. These were explored using qualitative interviews to discern, via critical events, stakeholders' ideas regarding the project's sustainability. Data collection sites were chosen with the participation of different stakeholders, based on a variety of criteria (rural/urban settings, level of participation, RBF participants still present, etc.). Forty-nine stakeholders were then interviewed in six community health centres and two referral health centres (from 11/12/15 to 08/03/16), including health practitioners, administrators, and those involved in implementing and conceptualizing the program (government and NGOs). A theme analysis was done with the software © QDA Miner according to the study's conceptual framework. The results of this project show a weak level of sustainability due to many factors. While some gains could be sustained (ex.: investments in long-term resources, high compatibility of values and codes, adapted design to the implementations contexts, etc.) other intended benefits could not (ex.: end of investments, lack of shared cultural artefacts around RBF, loss of different tasks and procedures, need of more ownership of the project by the local stakeholders). A lack of sustainability planning was observed, and few critical events were associated to phases of sustainability. While this RBF project aimed at increasing health agents' motivation through different mechanisms (supervision, investments, incentives, etc

  15. WIMS library up-date project: first stage results

    International Nuclear Information System (INIS)

    Prati, A.; Claro, L.H.

    1990-01-01

    The following benchmarks: TRX1, TRX2, BAPL-UO sub(2)-1, BAPL-UO sub (2)-2, BAPL-UO sub(2)-3 have been calculated with the WIMSD/4 code, as a contribution of CTA/IEAv, to the first stage of the WIMS Library Update Project, coordinated by the International Atomic Energy Agency. The card image input for each benchmark has been attached and the major input options/parameters are commented. The version of the WIMSD/4 code and its multigroup cross section library used to run the benchmarks are specified. Results from the major integral parameters are presented and discussed. (author)

  16. SKS splitting results in central Italy and Dinaric region inside the AlpArray-CASE project

    Science.gov (United States)

    Salimbeni, S.; Prevolnik, S.; Pondrelli, S.; Molinari, I.; Stipcevic, J.; Kissling, E.; Šipka, V.; Herak, M.

    2017-12-01

    In the framework of the AlpArray project (AlpArray Seismic Network, 2015), the complementary "Central Adriatic Seismic Experiment" (CASE; AlpArray Seismic Network, 2016) was established as collaboration between ETH Zürich, University of Zagreb, INGV and Republic Hydrometeorological Service of Republic of Srpska. The CASE project consists of 9 temporary stations, installed in October 2016, located in Bosnia and Herzegovina, Croatia and Italy. Temporary broadband seismic stations, with the permanent stations present in the region shared by the Croatian Seismological Service and INGV, make an almost continuous transect cutting the Central-Southern Appenines, the central Adriatic region, central External Dinarides and finishing at the eastern margin of the Internal Dinarides. The presence of the the Apenninic and Dinarides slabs, verging in opposite directions and plunging along the opposite sides of the Adriatic plate, make this area a peculiar spot to understand the complex dynamic of the region. Various tomographic images (e.g. Bijwaard and Spakman, 2000; Piromallo and Morelli, 2003) shows not continuous slabs under the Appenines and the Dinarides, suggesting the presence of slab-gaps right beneath the region covered by the CASE experiment. Here we present the preliminary results of the SKS splitting analysis performed on the data recorded by the temporary and permanent seismic stations included in the CASE project. The new results, in combination with previous interpretation, will provide clues about how Northern and Southern Apennines are connected at depth, how the slab rollback of the Apennines thrust belt acted and if and how the Apennines are in relation with the Dinaric region. Together with the measurements from previous studies and from the AlpArray project, our new data will support the mapping of the seismic anisotropy deformation pattern from Western Alps to Pannonian region.

  17. Red-impact project: First results of the evaluations of the impact of P and T on geological disposal

    International Nuclear Information System (INIS)

    Marivoet, Jan; Vokal, Antonin; Gudowski, Waclaw

    2006-01-01

    The Red-Impact project (Impact of partitioning, transmutation and waste reduction technologies on the final nuclear waste disposal) is a research project in the 6. Framework Programme of the European Commission. The main objective of the project is to assess the impact of partitioning and transmutation (P and T) on geological disposal and waste management. The project started with the identification of a number of representative fuel cycle scenarios. Five basis scenarios are considered for the evaluations: 2 industrial scenarios and 3 innovative scenarios. Mass flow schemes have been prepared for each basis fuel cycle scenario and the corresponding neutronic calculations have been made. A first list of performance indicators that will be calculated or estimated in the project has been prepared. As a first step the impact of 2 fuel cycle scenarios, the reference 'open cycle' scenario and of the innovative 'fast neutron Gen IV' scenario, on geological repositories in granite and clay formations have been evaluated. The results obtained show that the introduction of innovative fuel cycle scenarios can result in a considerable reduction of the needed size of the geological repository. However, the impact on the radiological consequences is rather limited. Indeed, the maximum dose, which is expected to occur a few tens of thousands year after the disposal of the waste, is essentially due to fission products and their amount is about proportional to the heat generated by nuclear fissions. (authors)

  18. First results from the BOXING (Birmingham-OCIW XMM and IMACS Nearby Groups) project.

    Science.gov (United States)

    Miles, T. A.; Raychaudhury, S.; Mulchaey, J. S.

    2004-12-01

    We present the first results from the BOXING (Birmingham-OCIW XMM and IMACS Nearby Groups) project, a collaboration between the Observatories of the Carnegie Institute of Washington (OCIW) and the University of Birmingham U.K. to study a sample of 25 galaxy groups (z ˜ 0.06) by means of optical photometry and spectroscopy (du Pont 2.5m; IMACS/Magellan) combined with x-ray observations (XMM). The combination of x-ray with optical data allows us to study the nature of the relationship between the properties of the groups and the galaxies that they contain. In this preliminary study, we present optical luminosity functions, which shows bimodal behavior in the poorer systems, interpreted as result of rapid merging. We also examine the dependence of galaxy morphology on local environment. Once spectroscopic observations are completed, we will be able to study velocity dispersions, star formation and nuclear activity in individual galaxies.

  19. HYRESS project. Study case of Tunisia. Installation, set-up and first results

    Energy Technology Data Exchange (ETDEWEB)

    Cendagorta, M.; Friend, M.; Lopez-Manzanares, L.; Rodriguez, J. [Poligono Industrial de Granadilla, Tenerife (Spain). Inst. Tecnologico y de Energias Renovables, S.A.; El Khazen, A. [Agence Nationale pour la Maitrise de l' Energie, Tunis (Tunisia); Linares, A.

    2010-07-01

    In the framework of the HYRESS project, a minigrid has been designed and installed at the village of Ksar Ghilene, in southern Tunisia. This project, developed from the perspective of knowledge transfer, will allow the installation of an underground minigrid during the trimester of 2010. STEG, Tunisian national electricity supplier, will finish civil works by May 2010. It is expected to have first results of system behaviour by the end of May or April 2010. (orig.)

  20. Conjoint utility analysis of technical maturity and project progress of construction project

    Directory of Open Access Journals (Sweden)

    Ma Wei

    2016-01-01

    Full Text Available In this paper, taking construction project as the research object, the relationship between the project maturity index calculated by the construction project technical risks with different fine degree and the project progress index is studied, and the equilibrium relationship between the Party A’s utility curve and the Party B’s cost curve of using project maturity index and project progress index as the research variables is analyzed. The results show that, when the construction project technical risk division is more precise, the conjoint utility of the project's technical maturity index and the project progress is higher, and the project’s Party A and Party B two sides are closer to the optimal equilibrium. This shows that the construction project technical risk must be finely divided, and managed and controlled respectively, which will help to improve the conjoint utility of the project Party A and Party B two sides.

  1. The Formation of the Model of Diagnosing the Results Implementation of of Consulting Projects for Enterprises

    Directory of Open Access Journals (Sweden)

    Kuzmin Oleh Ye.

    2017-11-01

    Full Text Available In the article the graphic-analytical model of diagnostics of results of implementation of consulting projects is formed, which allows to: take into consideration interests of participants to the project on choice of methods and methodologies of diagnosing; allocate alternative sets of business indicators for each object of impact in terms of consulting project; establish economic and non-economic criteria for evaluating the effectiveness of consulting, as well as monitoring of indicators and automated processing of diagnostic results to control deviations from the optimal values of the diagnosed project results. A structural-logical model of formation of alternative sets of indicators and choice of indicators for diagnostics of results of consulting projects has been developed. The elements of the enterprise management system have been codified to harmonize the corresponding indicators with their subsequent combination within the proposed sets. The control system objects and their elements have been allocated. The groups of indicators according to the technology of Balanced Score Card (BSC have been presented. The prospect of further research is the economic assessment of implementation of the diagnosed consulting projects, which will reveal the links between the parameters of production-economic activity and the assessment of projects, and allows choose the most significant ones.

  2. Community College Economics Instruction: Results from a National Science Foundation Project

    Science.gov (United States)

    Maier, Mark; Chi, W. Edward

    2016-01-01

    The principal investigator of a National Science Foundation project, "Economics at Community Colleges," surveyed community college economics faculty and organized workshops, webinars, and regional meetings to address community college faculty isolation from new ideas in economics and economics instruction. Survey results, combined with…

  3. [How do Prevention Projects Reach their Target Groups? Results of a Survey with Prevention Projects].

    Science.gov (United States)

    Brand, T; Böttcher, S; Jahn, I

    2015-12-01

     The aim of this study was to assess methods used to access target groups in prevention projects funded within the prevention research framework by the German Federal Ministry of Education and Research.  A survey with prevention projects was conducted. Access strategies, communication channels, incentives, programme reach, and successful practical recruitment strategies were explored.  38 out of 60 projects took part in the survey. Most projects accessed their target group within structured settings (e. g., child day-care centers, schools, workplaces). Multiple communication channels and incentives were used, with written information and monetary incentives being used most frequently. Only few projects were able to report their programme reach adequately; programme reach was highest for programmes accessing the target groups in structured settings. The respondents viewed active recruitment via personal communication with the target group and key persons in the settings as the most successful strategy.  The paper provides an overview on recruitment strategies used in current preven-tion projects. More systematic research on programme reach is necessary. © Georg Thieme Verlag KG Stuttgart · New York.

  4. Projected entrainment of fish resulting from aggregate dredging

    International Nuclear Information System (INIS)

    Drabble, Ray

    2012-01-01

    Previous research to assess impacts from aggregate dredging has focussed on infaunal species with few studies made of fish entrainment. Entrainment evidence from hydraulic dredging studies is reviewed to develop a sensitivity index for benthic fish. Environmental monitoring attendant with the granting of new licences in the Eastern Channel Region (ECR) in 2006 offers a unique opportunity to assess the effects of dredging upon fish. Projected theoretical fish entrainment rates are calculated based upon: abundance data from 4m beam trawl sampling of fish species over the period 2005–2008; sensitivity data; and dredging activity and footprint derived from Electronic monitoring System (EMS) data. Results have been compared with actual entrainment rates and also against summary results from independent analysis of the changes in fish population over the period 2005–2008 (). The case is made for entrainment surveys to form part of impact monitoring for marine aggregate dredging.

  5. Advanced Bimanual Manipulation Results from the DEXMART Project

    CERN Document Server

    2012-01-01

    Dexterous and autonomous manipulation is a key technology for the personal and service robots of the future. Advances in Bimanual Manipulation edited by Bruno Siciliano provides the robotics community with the most noticeable results of the four-year European project DEXMART (DEXterous and autonomous dual-arm hand robotic manipulation with sMART sensory-motor skills: A bridge from natural to artificial cognition). The volume covers a host of highly important topics in the field, concerned with modelling and learning of human manipulation skills, algorithms for task planning, human-robot interaction, and grasping, as well as hardware design of dexterous anthropomorphic hands. The results described in this five-chapter collection are believed to pave the way towards the development of robotic systems endowed with dexterous and human-aware dual-arm/hand manipulation skills for objects, operating with a high degree of autonomy in unstructured real-world environments.

  6. New Results from the DREAM project

    International Nuclear Information System (INIS)

    Meoni, E.

    2011-01-01

    Dual-Readout calorimetry is a promising new technique for high precision measurements of hadronic showers and jets. The DREAM Collaboration is exploiting the possibilities offered by this technique, a key aspect of which is the simultaneous measurement of the scintillation light and the Cerenkov light generated in the shower development process. By comparing these two signals, the electromagnetic shower fraction can be measured event by event, eliminating the effects of its fluctuations, that are the dominant contribution to the hadronic energy resolution. In the first detector of this type the two signals were provided by two independent active media: scintillating fibers and quartz fibers. In follow-up studies, we have explored the possibilities of heavy crystals such as BGO and PbWO4. The use of homogeneous detectors has the advantage that it eliminates the effects of fluctuations that limit the resolution of the fiber calorimeter: sampling fluctuations and quantum fluctuations in the Cerenkov signals. A very important tool turnes out to be a detailed measurement of the time structure of the signals. In this paper, the latest results of this project will be presented.

  7. FP7 Project LONGLIFE: Overview of results and implications

    International Nuclear Information System (INIS)

    Altstadt, Eberhard; Keim, Elisabeth; Hein, Hieronymus; Serrano, Marta; Bergner, Frank; Viehrig, Hans-Werner; Ballesteros, Antonio; Chaouadi, Rachid; Wilford, Keith

    2014-01-01

    Highlights: • Radiation effects in reactor pressure vessel steels under long term operation. • Indications of late blooming effects were found in some cases. • Significant flux effect on the size of defect clusters in high-Cu weld materials. • Guideline for monitoring radiation embrittlement during life extension. - Abstract: LONGLIFE (“Treatment of long term irradiation embrittlement effects in RPV safety assessment”) was a collaborative project of the 7th Framework Programme of EURATOM under the umbrella of NULIFE/NUGENIA, aiming at an improved understanding of irradiation effects in reactor pressure vessel steels under conditions representative of long term operation. The LONGLIFE project was completed by the end of January 2014. The paper gives an overview of the main project results and their implications for future research, as discussed at the final project workshop. The microstructural database for neutron-irradiated RPV steels was extended considerably and existing gaps on mechanical property data were closed. Indications of late blooming effects (LBE) were found in some cases, but clear criteria for the occurrence/exclusion in terms of irradiation conditions and chemical composition have still to be developed. The commonly accepted trend, that low flux and low irradiation temperature promotes LBE, is supported. A significant flux effect on the size of defect clusters was observed in two high Cu weld materials, while the changes of mechanical properties are not affected by the neutron flux. The database requires completion in particular for low-Cu RPV steels. The shift of reference temperature T 0 over the thickness location of a VVER-440 welding seam does not follow the prediction Russian code, because of the strong variation of the intrinsic weld bead structure. Therefore, the effect of the initial microstructure and of the heterogeneity on the radiation behaviour has to be addressed in future works. Existing embrittlement trend curves models

  8. Statistical analysis of real-time, enviromental radon monitoring results at the Fernald Enviromental Management Project

    International Nuclear Information System (INIS)

    Liu, Ning; Spitz, H.B.; Tomezak, L.

    1996-01-01

    A comprehensive real-time, environmental radon monitoring program is being conducted at the Fernald Environmental Management Project, where a large quantity of radium-bearing residues have been stored in two covered earth-bermed silos. Statistical analyses was conducted to determine what impact radon emitted by the radium bearing materials contained in the silos has on the ambient radon concentration at the Fernald Environmental Management Project site. The distribution that best describes the outdoor radon monitoring data was determined before statistical analyses were conducted. Random effects associated with the selection of radon monitoring locations were accommodated by using nested and nested factorial classification models. The Project site was divided into four general areas according to their characteristics and functions: (1) the silo area, where the radium-bearing waste is stored; (2) the production/administration area; (3) the perimeter area, or fence-line, of the Fernald Environmental Management Project site; and (4) a background area, located approximately 13 km from the Fernald Environmental Management Project site, representing the naturally-occurring radon concentration. A total of 15 continuous, hourly readout radon monitors were installed to measure the outdoor radon concentration. Measurement results from each individual monitor were found to be log-normally distributed. A series of contrast tests, which take random effects into account, were performed to compare the radon concentration between different areas of the site. These comparisons demonstrate that the radon concentrations in the production/administration area and the perimeter area are statistically equal to the natural background, whereas the silo area is significantly higher than background. The study also showed that the radon concentration in the silo area was significantly reduced after a sealant barrier was applied to the contents of the silos. 10 refs., 6 figs., 8 tabs

  9. Literacy and students' interest on Geosciences - Findings and results of GEOschools project

    Science.gov (United States)

    Fermeli, Georgia; Steininger, Fritz; Dermitzakis, Michael; Meléndez, Guillermo; Page, Kevin

    2014-05-01

    GEOschools is a European project supported by the Lifelong Learning Programme. Among the main aims of the project were to investigate the interest secondary school students have on geosciences and the teaching strategies used. Also, the development of a guide for Geosciences Literacy at a European level (Fermeli et al., 2011). GEOschools' literacy framework proposal is based on a comparative analysis of geoscience curricula in the partner countries (Austria, Greece, Italy, Spain and Portugal). Results of an "Interest Research" survey involved around 1750 students and 60 teachers from partner countries, combined with specific proposals by the project partners (Calonge et al., 2011). Results of the GEOschools "Interest research" survey evidence students show a higher interest in those topics which have a potentially higher social impact, such as mass extinctions, dinosaurs, geological hazards and disasters and origin and evolution of life (including human evolution). These results provide an evidence base to justify why curriculum content and teaching strategies can be made more effective through focusing mainly on such "interest topics", instead of trying to follow an excessively rigid, or academic, development of teaching programs (Fermeli et al., 2013). GEOschools literacy framework is summarized in 14 separate chapters, each including a brief description of the main themes of each subject, the intended learning outcomes as well as keywords and a bibliography. More particularly, the chapters of the framework describe what students should know and do, and how they should relate, as European citizens, to the geosciences. To face the challenges of the present and the future, modern citizens should be literate in natural sciences and, within the context of the geosciences, be able to: • Demonstrate a knowledge and understanding of basic principles, models, laws and terminology of Geosciences. • Know how and where to find and access scientifically reliable

  10. Lesion insertion in the projection domain: Methods and initial results.

    Science.gov (United States)

    Chen, Baiyu; Leng, Shuai; Yu, Lifeng; Yu, Zhicong; Ma, Chi; McCollough, Cynthia

    2015-12-01

    To perform task-based image quality assessment in CT, it is desirable to have a large number of realistic patient images with known diagnostic truth. One effective way of achieving this objective is to create hybrid images that combine patient images with inserted lesions. Because conventional hybrid images generated in the image domain fails to reflect the impact of scan and reconstruction parameters on lesion appearance, this study explored a projection-domain approach. Lesions were segmented from patient images and forward projected to acquire lesion projections. The forward-projection geometry was designed according to a commercial CT scanner and accommodated both axial and helical modes with various focal spot movement patterns. The energy employed by the commercial CT scanner for beam hardening correction was measured and used for the forward projection. The lesion projections were inserted into patient projections decoded from commercial CT projection data. The combined projections were formatted to match those of commercial CT raw data, loaded onto a commercial CT scanner, and reconstructed to create the hybrid images. Two validations were performed. First, to validate the accuracy of the forward-projection geometry, images were reconstructed from the forward projections of a virtual ACR phantom and compared to physically acquired ACR phantom images in terms of CT number accuracy and high-contrast resolution. Second, to validate the realism of the lesion in hybrid images, liver lesions were segmented from patient images and inserted back into the same patients, each at a new location specified by a radiologist. The inserted lesions were compared to the original lesions and visually assessed for realism by two experienced radiologists in a blinded fashion. For the validation of the forward-projection geometry, the images reconstructed from the forward projections of the virtual ACR phantom were consistent with the images physically acquired for the ACR

  11. Variances in the projections, resulting from CLIMEX, Boosted Regression Trees and Random Forests techniques

    Science.gov (United States)

    Shabani, Farzin; Kumar, Lalit; Solhjouy-fard, Samaneh

    2017-08-01

    The aim of this study was to have a comparative investigation and evaluation of the capabilities of correlative and mechanistic modeling processes, applied to the projection of future distributions of date palm in novel environments and to establish a method of minimizing uncertainty in the projections of differing techniques. The location of this study on a global scale is in Middle Eastern Countries. We compared the mechanistic model CLIMEX (CL) with the correlative models MaxEnt (MX), Boosted Regression Trees (BRT), and Random Forests (RF) to project current and future distributions of date palm ( Phoenix dactylifera L.). The Global Climate Model (GCM), the CSIRO-Mk3.0 (CS) using the A2 emissions scenario, was selected for making projections. Both indigenous and alien distribution data of the species were utilized in the modeling process. The common areas predicted by MX, BRT, RF, and CL from the CS GCM were extracted and compared to ascertain projection uncertainty levels of each individual technique. The common areas identified by all four modeling techniques were used to produce a map indicating suitable and unsuitable areas for date palm cultivation for Middle Eastern countries, for the present and the year 2100. The four different modeling approaches predict fairly different distributions. Projections from CL were more conservative than from MX. The BRT and RF were the most conservative methods in terms of projections for the current time. The combination of the final CL and MX projections for the present and 2100 provide higher certainty concerning those areas that will become highly suitable for future date palm cultivation. According to the four models, cold, hot, and wet stress, with differences on a regional basis, appears to be the major restrictions on future date palm distribution. The results demonstrate variances in the projections, resulting from different techniques. The assessment and interpretation of model projections requires reservations

  12. Occupational emerging risks affecting international virtual project Team Results

    Directory of Open Access Journals (Sweden)

    Dumitraşcu-Băldău Iulia

    2017-01-01

    Full Text Available The expansion of internet access, high-speed connection services, collaborative work platforms and tools, allowed employees to interact virtually offering companies the possibility to develop projects around the world, reducing operational costs and gain competitive advantage. Realizing the advantages and disadvantages of developing a project team in an international virtual work environment, requires adopting specific strategies to construct an effective team and ensure the project success. One of the most important disadvantages that we identified is that the new work environment brings new risks for both team members and managers. So, it becomes mandatory to identify and analyze the occupational emerging risks and their impact on the productivity of virtual team members, in order to prevent them efficiently and to ensure the safety and health of employees in a virtual working environment. This paper aims to highlight the necessity for project managers and organizations, to include in their specific project strategies, an efficient occupational risks management in the virtual workplace, to obtain a continuously improved virtual working environment, so to achieve a high performance from virtual employees.

  13. Evolution of the GATE project: new results and developments

    Energy Technology Data Exchange (ETDEWEB)

    Santin, G. [ESA-ESTEC, Keplerlaan 1, 2200 AG Noordwijk (Netherlands); Staelens, S. [ELIS Department, Ghent University, B-9000 Ghent (Belgium); Taschereau, R. [CRUMP Institute for Molecular Imaging, University of California Los Angeles, 700 Westwood Plaza A438, Los Angeles, CA 90095-1770 (United States); Descourt, P. [U650 INSERM, LaTIM, Brest (France); Schmidtlein, C.R. [Memorial Sloan-Kettering Cancer Center, New York, New York, US (United States); Simon, L. [Department of Radiation Oncology, Institut Curie, Paris (France); Visvikis, D. [U650 INSERM, LaTIM, Brest (France); Jan, S. [Service Hospitalier Frederic Joliot (SHFJ), CEA-Orsay, Orsay (France); Buvat, I. [U678 INSERM, CHU Pitie-Salpetriere, Paris (France)

    2007-10-15

    We present the status of the Geant4 Application for Emission Tomography (GATE) project, a Monte Carlo simulator for Single Photon Emission Computed Tomography (SPECT) and Positron annihilation Emission Tomography (PET). Its main features are reminded, including modelling of time dependent phenomena and versatile, user-friendly scripting interface. The focus of this manuscript will be on new developments introduced in the past 4 years. New results have been achieved in the fields of validation on real medical and research PET and SPECT systems, voxel geometries, digitisation, distributed computing and dosimetry.

  14. Evolution of the GATE project: new results and developments

    International Nuclear Information System (INIS)

    Santin, G.; Staelens, S.; Taschereau, R.; Descourt, P.; Schmidtlein, C.R.; Simon, L.; Visvikis, D.; Jan, S.; Buvat, I.

    2007-01-01

    We present the status of the Geant4 Application for Emission Tomography (GATE) project, a Monte Carlo simulator for Single Photon Emission Computed Tomography (SPECT) and Positron annihilation Emission Tomography (PET). Its main features are reminded, including modelling of time dependent phenomena and versatile, user-friendly scripting interface. The focus of this manuscript will be on new developments introduced in the past 4 years. New results have been achieved in the fields of validation on real medical and research PET and SPECT systems, voxel geometries, digitisation, distributed computing and dosimetry

  15. Applying the results based management framework to the CERCA multi-component project in adolescent sexual and reproductive health: a retrospective analysis.

    Science.gov (United States)

    Cordova-Pozo, Kathya; Hoopes, Andrea J; Cordova, Freddy; Vega, Bernardo; Segura, Zoyla; Hagens, Arnold

    2018-02-08

    Adolescent sexual and reproductive health (SRH), problems such as unplanned pregnancies are complex and multifactorial, thus requiring multifaceted prevention interventions. Evaluating the impact of such interventions is important to ensure efficiency, effectiveness and accountability for project funders and community members. In this study, we propose Results Based Management (RBM) as a framework for project management, using the Community Embedded Reproductive Health Care for Adolescents (CERCA) as a case study for RBM. The CERCA Project (2010-2014) tested interventions to reduce adolescent pregnancy in three Latin American countries, Bolivia, Ecuador and Nicaragua. Activities were designed to increase adolescent SRH behaviors in four domains: communication with parents, partners and peers; access to SRH information; access to SRH services; and use of contraception. When the project ended, the outcome evaluation showed limited impact with concerns about accuracy of monitoring and attrition of participants. We reviewed and analyzed a series of CERCA documents and related data sources. Key findings from these documents were organized within an RBM framework (planning, monitoring, and impact evaluation) to understand how CERCA methodology and performance might have reaped improved results. Strengths and weaknesses were identified in all three elements of the RBM framework. In Planning, the proposed Theory of Change (ToC) differed from that which was carried out in the intervention package. Each country implemented a different intervention package without articulated assumptions on how the activities of intervention would bring about change. In Monitoring, the project oversight was mainly based on administrative and financial requirements rather than monitoring fidelity and quality of intervention activities. In Impact Evaluation, the original CERCA evaluation assessed intervention effects among adolescents, without identifying success and failure factors related to

  16. Results From a Channel Restoration Project: Hydraulic Design Considerations

    Science.gov (United States)

    Karle, K.F.; Densmore, R.V.; ,

    2001-01-01

    Techniques for the hydraulic restoration of placer-mined streams and floodplains were developed in Denali National Park and Preserve, Alaska. The two-year study at Glen Creek focused on a design of stream and floodplain geometry using hydraulic capacity and shear stress equations. Slope and sinuosity values were based on regional relationships. Design requirements included a channel capacity for a bankfull discharge and a floodplain capacity for a 1.5- to 100-year discharge. Several bio-engineering techniques using alder and willow, including anchored brush bars, streambank hedge layering, seedlings, and cuttings, were tested to dissipate floodwater energy and encourage sediment deposition until natural revegetation stabilized the new floodplains. Permanently monumented cross-sections installed throughout the project site were surveyed every one to three years. Nine years after the project began, a summer flood caused substantial damage to the channel form, including a change in width/depth ratio, slope, and thalweg location. Many of the alder brush bars were heavily damaged or destroyed, resulting in significant bank erosion. This paper reviews the original hydraulic design process, and describes changes to the channel and floodplain geometry over time, based on nine years of cross-section surveys.

  17. The global unified parallel file system (GUPFS) project: FY 2002 activities and results

    Energy Technology Data Exchange (ETDEWEB)

    Butler, Gregory F.; Lee, Rei Chi; Welcome, Michael L.

    2003-04-07

    The Global Unified Parallel File System (GUPFS) project is a multiple-phase, five-year project at the National Energy Research Scientific Computing (NERSC) Center to provide a scalable, high performance, high bandwidth, shared file system for all the NERSC production computing and support systems. The primary purpose of the GUPFS project is to make it easier to conduct advanced scientific research using the NERSC systems. This is to be accomplished through the use of a shared file system providing a unified file namespace, operating on consolidated shared storage that is directly accessed by all the NERSC production computing and support systems. During its first year, FY 2002, the GUPFS project focused on identifying, testing, and evaluating existing and emerging shared/cluster file system, SAN fabric, and storage technologies; identifying NERSC user input/output (I/O) requirements, methods, and mechanisms; and developing appropriate benchmarking methodologies and benchmark codes for a parallel environment. This report presents the activities and progress of the GUPFS project during its first year, the results of the evaluations conducted, and plans for near-term and longer-term investigations.

  18. Dry Rod Consolidation Technology Project results

    International Nuclear Information System (INIS)

    Mullen, C.K.; Feldman, E.M; Vinjamuri, K.; Griebenow, B.L.; Lynch, R.J.; Arave, A.E.; Hill, R.C.

    1988-01-01

    The Dry Rod Consolidation Technology (DRCT) Project conducted at the Idaho National Engineering Laboratory (INEL), in 1987 demonstrated the technical feasibility of a dry horizontal fuel rod consolidation process. Fuel rods from Westinghouse 15 /times/ 15 pressurized water reactor (PWR) spent fuel assemblies were consolidated into canisters to achieve a 2:1 volume reduction ratio. The consolidation equipment was operated at an existing hot cell complex at the INEL. The equipment was specifically designed to interface with the existing facility fuel handling and operational capabilities and was instrumented to provide data collection for process technology research. During the operational phase, data were collected from observation of the consolidation process, fuel assembly handling, and fuel rod behavior and characteristics. Equipment performance was recorded and data measurements were compiled on crud and contamination generated and spread. Fuel assembly skeletons [non-fuel bearing components (NFBC)] were gamma scanned and analyzed for isotopic content and profile. The above data collection was enhanced by extensive photograph and video documentation. The loaded consolidation fuel canisters were utilized for a test of the Transnuclear, Inc. TN-24P dry storage cask with consolidated fuel. The NFBC material was stored for a future volume reduction demonstration project. 14 figs., 4 tabs

  19. [Results of the implementation of the Bacteremia Zero project in Catalonia, Spain].

    Science.gov (United States)

    Alvarez-Lerma, Francisco; Oliva, Glòria; Ferrer, Joan M; Riera, Alba; Palomar, Mercedes

    2014-07-01

    The nationwide Bacteremia Zero (BZ) Project consists in the simultaneous implementation of measures to prevent central venous catheter-related bacteremia (CVC-B) in critically ill patients and in the development of an integral safety plan. The objective is to present the results obtained after the implementation of the BZ project in the ICUs of the Autonomous Community of Catalonia, Spain. All patients admitted to ICUs in Catalonia participating in the ENVIN-HELICS registry between January 2009 and June 2010 were included. Information was provided by 36 (92.3%) of the total possible 39 ICUs. A total of 281 episodes of CVC-B were diagnosed (overall rate of 2.53 episodes per 1000 days of CVC). The rates have varied significantly between ICUs that participated in the project for more or less than 12 months (2.17 vs. 4.27 episodes per 1000 days of CVC, respectively; p<.0001). The implementation of the BZ Project in Catalonia has been associated with a decrease greater than 40% in the CVC-B rates in the ICUs of this community, which is much higher than the initial objective of 4 episodes per 1000 days of CVC). Copyright © 2014. Published by Elsevier Espana.

  20. Micronutrient Supplementation, Dietary Intervention and Resulting Body Weight Gain of Severe Acute Malnourished Children – A Pilot Project Study of OJUS Medical Institute with Existing ICDS Project in Nasik District, Maharashtra

    Directory of Open Access Journals (Sweden)

    Subhasree Ray

    2014-12-01

    Full Text Available Introduction: OJUS Medical Institute in collaboration with Women & Child development department of Nashik District, Maharashtra conducted a target oriented pilot project study to see the improvement in body weight gain of SAM children, supplemented with nutritionally enriched diet and micronutrients. The Egg-DOT project is a target vertical intervention study that involved both Anganwadi workers and Community health workers to bring a fruitful result by working hand-in-hand. Rationale: ICDS is one of the best supplementary nutrition programs to address and eliminate malnutrition from the country. To make it more comprehensive and result oriented the pilot project study is formulated and executed to see if the addition in existing system could eradicate malnutrition in an effective manner and strengthen the Govt. health machinery. Objective: The study aimed at working along with the Govt. to reduce severity of malnutrition. It shouted for a healthy public-private relationship to bring optimum result from the existing Govt. project in reducing burden of malnutrition, spreading health education and behavioural modification in the community members by adopting a systematic micronutrient-diet-health education  intervention strategy. Materials & methods: Along with existing nutritional intervention, a small modification in diet is introduced to fulfill the deficit of 300 Kcal approximately. Good quality fat and protein are added to the Anganwadi meal with daily micronutrient supplementation. The supplementation is continued for 30 days in 25 SAM children of 3 to 5 years. The baseline and end line body weight measurements are taken and compared to see the improvement. Result: After 30 days of intervention the supplemented SAM children showed statistically significant increased body weight (P<0.01 with an overall healthy nutritional status. Conclusion: The study showed that public-private collaborative systematic strategy with proper

  1. Major results and lessons learned for performance assessments of spent fuel geological disposal: the SPA project

    International Nuclear Information System (INIS)

    Baudoin, P.; Serres, C.; Certes, C.; Gay, D.

    2001-01-01

    This paper presents a summary of the results obtained in the framework of the SPA (spent fuel disposal performance assessment) project. The project was undertaken by ENRESA, E; GRS, D; IPSN, F; NRG, NL; SCK.CEN, B and VTT, FIN between May 1996 and April 1999. Devoted to the study of spent fuel disposal in various host rock formations (clay, crystalline rocks and salt formation), it notably had the objective to evaluate the long-term performance of different repository systems and to identify the most influential elements. The variety of concepts, sites and scenarios considered in the framework of this project provides a wide range of information from which some general conclusions can be drawn. Focusing on the work done in the case of granite host rock formations, this paper describes the various approaches adopted and states the main sources of differences. It particularly stresses the differences related to the geosphere and biosphere modelling. For the geosphere modelling, ENRESA, GRS and VTT use one dimensional discrete approaches to model the migration of contaminants through the geosphere taking into account for matrix diffusion, whereas IPSN uses a three dimensional continuum approach based on a single porosity model. The comparison of the biosphere conversion factors shows the high influence on the calculated radionuclide dose contributions that can results from biosphere modelling assumptions. It notably points out the differences existing between a simplified ''water drinking'' approach as implemented by VTT and a more classical one in which a wider range of exposure pathways are taken into account. (orig.)

  2. Developing priority criteria for magnetic resonance imaging: results from the Western Canada Waiting List project

    International Nuclear Information System (INIS)

    Hadorn, D.C.

    2002-01-01

    The Western Canada Waiting List (WCWL) Project is a federally funded partnership of 19 organizations, including medical associations, health authorities, ministries of health and research organizations, that was created to develop tools to assist in assessing the relative urgency and priority of patients on waiting lists. The WCWL panel on magnetic resonance imaging (MRI) was 1 of 5 panels constituted under this project. The panel developed and tested a set of standardized clinical criteria for setting priorities among patients awaiting MRI. The criteria were applied to 407 patients in the 4 western provinces. Regression analysis was used to determine the set of criteria weights that collectively best predicted clinicians' overall ratings of patients' urgency for MRI. Reliability was assessed using clinicians' ratings of 6 hypothetical paper cases. The resulting weighted criteria accounted for about two-fifths of the observed variance in overall urgency ratings (R 2 = 39.9%). The panel then modified the criteria on the basis of regression results and clinical judgment. Most of the revised criteria items showed poor inter-rater reliability, but test-retest reliability (over a 2-month interval) was relatively good. Criteria items requiring probability judgments were a challenge for clinicians. Further development and testing of the tool appears warranted, although considerable question remains concerning the utility of priority criteria for MRI and other diagnostic services. (author)

  3. Summary results of an assessment of research projects in the National Photovoltaics Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    The Office of Energy Research (OER) undertook an assessment of 115 research projects (listed in Appendix A) sponsored by the National Photovoltaics Program. The Program is located within the Office of Energy Efficiency and Renewable Energy (EE). This report summarizes the results of that review. The Office of Solar Energy Conversion is responsible for the management of the National Photovoltaics Program. This program focuses on assisting US industry in development of fundamental technology to bring advanced photovoltaic energy systems to commercial use. The purpose of the assessment was to determine the following: (1) the quality of research of individual projects; (2) the impact of these individual projects on the mission of the program; and (3) the priority of future research opportunities.

  4. Interdependency in Multimodel Climate Projections: Component Replication and Result Similarity

    Science.gov (United States)

    Boé, Julien

    2018-03-01

    Multimodel ensembles are the main way to deal with model uncertainties in climate projections. However, the interdependencies between models that often share entire components make it difficult to combine their results in a satisfactory way. In this study, how the replication of components (atmosphere, ocean, land, and sea ice) between climate models impacts the proximity of their results is quantified precisely, in terms of climatological means and future changes. A clear relationship exists between the number of components shared by climate models and the proximity of their results. Even the impact of a single shared component is generally visible. These conclusions are true at both the global and regional scales. Given available data, it cannot be robustly concluded that some components are more important than others. Those results provide ways to estimate model interdependencies a priori rather than a posteriori based on their results, in order to define independence weights.

  5. The Geographic Climate Information System Project (GEOCLIMA): Overview and preliminary results

    Science.gov (United States)

    Feidas, H.; Zanis, P.; Melas, D.; Vaitis, M.; Anadranistakis, E.; Symeonidis, P.; Pantelopoulos, S.

    2012-04-01

    The project GEOCLIMA aims at developing an integrated Geographic Information System (GIS) allowing the user to manage, analyze and visualize the information which is directly or indirectly related to climate and its future projections in Greece. The main components of the project are: a) collection and homogenization of climate and environmental related information, b) estimation of future climate change based on existing regional climate model (RCM) simulations as well as a supplementary high resolution (10 km x 10 km) simulation over the period 1961-2100 using RegCM3, c) compilation of an integrated uniform geographic database, and d) mapping of climate data, creation of digital thematic maps, and development of the integrated web GIS application. This paper provides an overview of the ongoing research efforts and preliminary results of the project. First, the trends in the annual and seasonal time series of precipitation and air temperature observations for all available stations in Greece are assessed. Then the set-up of the high resolution RCM simulation (10 km x 10 km) is discussed with respect to the selected convective scheme. Finally, the relationship of climatic variables with geophysical features over Greece such as altitude, location, distance from the sea, slope, aspect, distance from climatic barriers, land cover etc) is investigated, to support climate mapping. The research has been co-financed by the European Union (European Regional Development Fund) and Greek national funds through the Operational Program "Competitiveness and Entrepreneurship" of the National Strategic Reference Framework (NSRF) - Research Funding Program COOPERATION 2009.

  6. Business Value Is not only Dollars : Results from Case Study Research on Agile Software Projects

    NARCIS (Netherlands)

    Racheva, Z.; Daneva, Maia; Sikkel, Nicolaas; Buglione, Luigi; Ali Babar, M.; Vierimaa, Matias; Oivo, Markku

    Business value is a key concept in agile software development. This paper presents results of a case study on how business value and its creation is perceived in the context of agile projects. Our overall conclusion is that the project participants almost never use an explicit and structured

  7. Students Opinions and Attitudes toward LGBT Persons and Rights: Results of a Transnational European Project

    Science.gov (United States)

    Passani, Antonella; Debicki, Marie

    2016-01-01

    This article presents the research results of the European co-funded project NISO: Fighting Homophobia Through Active Citizenship and Media Education. The project combined research and non-formal education activities in four European countries: Belgium, Estonia, Italy and the Netherlands. The research intended to identify and analyze high school…

  8. Testing Delays Resulting in Increased Identification Accuracy in Line-Ups and Show-Ups.

    Science.gov (United States)

    Dekle, Dawn J.

    1997-01-01

    Investigated time delays (immediate, two-three days, one week) between viewing a staged theft and attempting an eyewitness identification. Compared lineups to one-person showups in a laboratory analogue involving 412 subjects. Results show that across all time delays, participants maintained a higher identification accuracy with the showup…

  9. SKI Project-90. Geosphere calculations using CRYSTAL: Stand-alone and CALIBRE-CRYSTAL-biosphere integrated results

    International Nuclear Information System (INIS)

    Worgan, K.; Shaw, W.

    1992-02-01

    In Project-90, the far-field transport of nuclides is assumed to take place in a 200 m long section of rock mass, which starts at the outer boundary of the near-field and ends in a fracture zone. The nuclides are eventually discharged to the biosphere. This document provides an overview of the results obtained with the far-field model CRYSTAL developed by Intera Environmental Division for the Swedish Nuclear Power Inspectorate (SKI). It reports on the results of a series of calculation that have been performed within the SKIs Project-90, and provides some indication of the key parameters for the far field. A more thorough discussion of the implications for performance assessment is given in the Project-90 reports. (au)

  10. The MACHO Project: Preliminary Results from 4 years of SMC observations.

    Science.gov (United States)

    Vandehei, T.; Griest, K.; Lehner, M.; Alcock, C.; Alves, D.; Cook, K.; Marshall, S.; Minniti, D.; Allsman, R.; Axelrod, T.; Freeman, K.; Peterson, B.; Rodgers, A.; Pratt, M.; Becker, A.; Stubbs, C.; Tomaney, A.; Bennett, D.; Quinn, P.; Sutherland, W.; Welch, D.

    1997-12-01

    The MACHO project is a search for dark matter in the form of massive compact halo objects(MACHOs). The project has photometrically monitored tens of millions of stars in the Large Magellanic Cloud (LMC), Small Magellanic Cloud (SMC), and Galactic bulge in search of rare gravitational microlensing events caused by these otherwise invisible objects. Microlensing toward the LMC has allowed powerful statements to be made about the dark population in the halo of our Galaxy, indicating that the MACHO halo fraction could be as high as f=0.5 with a most probable MACHO mass being ~ 0.5Msun. However, to date the LMC has been the only line of sight out of our Galaxy's halo. Clearly, another line of sight would provide a consistency check on these results, as well as another contraint on models of the halo, in particular on halo flattening. The SMC affords us this second line of sight. Here we give a status report on our upcoming 4 year results toward the SMC. We present the results of a preliminary analysis on over 2.2 million stars from 3 square degrees and discuss the implications for the dark matter in the halo of our Galaxy. A detailed analysis of the microlensing candidates toward the SMC, with blending and parallax fits, will be shown. This work is dedicated to the memory of Alex Rodgers.

  11. Ambient Assisted Living and ageing: preliminary results of RITA project.

    Science.gov (United States)

    Aquilano, Michela; Cavallo, Filippo; Bonaccorsi, Manuele; Esposito, Raffaele; Rovini, Erika; Filippi, Massimo; Esposito, Dario; Dario, Paolo; Carrozza, Maria Chiara

    2012-01-01

    The ageing of population is a social phenomenon that most of worldwide countries are facing. They are, and will be even more in the future, indeed trying to find solutions for improving quality of life of their elderly citizens. The project RITA wants to demonstrate that an update of the current socio-medical services with an Ambient Assisted Living (AAL) approach could improve the service efficiency and the quality of life of both elderly and caregiver. This paper presents the preliminary results obtained in RITA.

  12. Preliminary results of the PREFER FP7 Project

    Science.gov (United States)

    Fusilli, Lorenzo; Laneve, Giovanni; De Bonis, Roberto; Sebastian, Ana; Ferrucci, Fabrizio; Oliveira, Sandra

    2014-05-01

    The need to improve the information and intelligence support for forest fire prevention is widely recognized. Fire prevention is still the most cost-effective strategy when compared to firefighting and extinguishing that are costly, local, and triggered only in response to already ongoing crises. PREFER project, funded under the EU FP7 (G.A. 312931), intends to contribute at responding to such a pragmatic need of southern Europe's forests by: providing timely information products based on the exploitation of all available spacecraft sensors, offering a portfolio of products focused on pre- and post-crisis forest fire emergency, suitable for the users in the different countries of the European Mediterranean area. The PREFER Service portfolio consists of two main services: 1. Information Support to Fire Preparedness/Prevention Phase" (ISP) Service 2. Information Support to Fire Recovery/Reconstruction Phase" (ISR) Service This service is already at an advanced stage having completed the first year of activity. During this time several products have been consolidated: seasonal fuel maps; daily and seasonal fire hazard maps; seasonal risk maps; prescribed fire maps. This paper aims at presenting the preliminary results of the research activity carried out in the framework of the PREFER project, focusing, in particular, on these recalled above. As for Fire Risk and Hazard assessment, many indexes have been developed in the last years. Hardly any of them uses data derived from satellite images. The FPI index is an exception to this rule which, in addition, makes use of meteorological data. In spite of being a very complete index, the FPI still allows room for improvement which justify the interest of PREFER in it. PREFER's innovative approach to FPI will allow taking into account the effect of solar illumination conditions in determining the humidity present in the dead vegetation, and therefore its proneness to burn. PREFER innovation also focus in allowing the index to

  13. The Role of Research in School Project Work and Teacher Development: Results from Project "Schools Ethics Technology."

    Science.gov (United States)

    Wellensiek, Anneliese; Lembens, Anja; Schallies, Michael

    "Schools Ethics Technology" was a German interdisciplinary research project with the Centre of Ethics in the Sciences at the University of Tubingen. The project highlighted the new topic of biotechnology and genetic engineering, involving the formation of active project groups within schools. This study examined teaching activities…

  14. INTERDISCIPLINARITY IN PUBLIC SPACE PARTICIPATIVE PROJECTS: METHODS AND RESULTS IN PRACTICE AND TEACHING

    Directory of Open Access Journals (Sweden)

    Pedro Brandão

    2015-06-01

    • In the development of design practice and studio teaching methods We shall see in this paper how interdisciplinary approaches correspond to new and complex urban transformations, focusing on the importance of actors’ interaction processes, combining professional and non-professional knowledge and theory-practice relations. Therefore, we aim at a deepening in public space area of knowledge under the growing complexity of urban life. We see it as a base for further development of collaborative projects and their implications on community empowerment and urban governance at local level. Motivations of this line of work are persistent in several ongoing research projects, aiming to: - Understand public space as a cohesion factor both in urban life and urban form - Manage processes and strategies as elements of urban transformation, - Stimulate the understanding of actors’ roles in urban design practices. - Favoring the questioning of emerging aspects of urban space production… The paper presents and analyses processes, methods and results from civic participation projects developed in the neighbourhood of Barò de Viver (Barcelona and in the District of Marvila (Lisbon. In the first case, a long process initiated in 2004 and partially completed in 2011, neighbours developed the projects "Memory Wall" and Ciutat d'Asuncion Promenade as part of identity construction in public space, in collaboration  with a team of facilitators from CrPolis group. In the second case, different participatory processes dated from 2001 and 2003 have resulted in the implementation of a specific identity urban brand and communication system with an ongoing project of "maps" construction according to the neighbours perception and representation systems. We may conclude that processes of urban governance require more active participation of citizens in projects regarding the improvement of quality of life. At the same time, the implementation of these processes requires a clear

  15. IMAGE Project: Results of Laboratory Tests on Tracers for Supercritical Conditions.

    Science.gov (United States)

    Brandvoll, Øyvind; Opsahl Viig, Sissel; Nardini, Isabella; Muller, Jiri

    2016-04-01

    The use of tracers is a well-established technique for monitoring dynamic behaviour of water and gas through a reservoir. In geothermal reservoirs special challenges are encountered due to high temperatures and pressures. In this work, tracer candidates for monitoring water at supercritical conditions (temperature > 374°C, pressure ca 218 bar), are tested in laboratory experiments. Testing of tracers at supercritical water conditions requires experimental set-ups which tolerate harsh conditions with respect to high temperature and pressure. In addition stringent HES (health, environment and safety) factors have to be taken into consideration when designing and performing the experiments. The setup constructed in this project consists of a pressure vessel, high pressure pump, instrumentation for pressure and temperature control and instrumentation required for accurate sampling of tracers. In order to achieve accurate results, a special focus has been paid to the development of the tracer sampling technique. Perfluorinated cyclic hydrocarbons (PFCs) have been selected as tracer candidates. This group of compounds is today commonly used as gas tracers in oil reservoirs. According to the literature they are stable at temperatures up to 400°C. To start with, five PFCs have been tested for thermal stability in static experiments at 375°C and 108 bar in the experimental setup described above. The tracer candidates will be further tested for several months at the relevant conditions. Preliminary results indicate that some of the PFC compounds show stability after three months. However, in order to arrive at conclusive results, the experiments have to be repeated over a longer period and paying special attention to more accurate sampling procedures.

  16. Public library consumer health information pilot project: results of a National Library of Medicine evaluation.

    Science.gov (United States)

    Wood, F B; Lyon, B; Schell, M B; Kitendaugh, P; Cid, V H; Siegel, E R

    2000-10-01

    In October 1998, the National Library of Medicine (NLM) launched a pilot project to learn about the role of public libraries in providing health information to the public and to generate information that would assist NLM and the National Network of Libraries of Medicine (NN/LM) in learning how best to work with public libraries in the future. Three regional medical libraries (RMLs), eight resource libraries, and forty-one public libraries or library systems from nine states and the District of Columbia were selected for participation. The pilot project included an evaluation component that was carried out in parallel with project implementation. The evaluation ran through September 1999. The results of the evaluation indicated that participating public librarians were enthusiastic about the training and information materials provided as part of the project and that many public libraries used the materials and conducted their own outreach to local communities and groups. Most libraries applied the modest funds to purchase additional Internet-accessible computers and/or upgrade their health-reference materials. However, few of the participating public libraries had health information centers (although health information was perceived as a top-ten or top-five topic of interest to patrons). Also, the project generated only minimal usage of NLM's consumer health database, known as MEDLINEplus, from the premises of the monitored libraries (patron usage from home or office locations was not tracked). The evaluation results suggested a balanced follow-up by NLM and the NN/LM, with a few carefully selected national activities, complemented by a package of targeted activities that, as of January 2000, are being planned, developed, or implemented. The results also highlighted the importance of building an evaluation component into projects like this one from the outset, to assure that objectives were met and that evaluative information was available on a timely basis, as was

  17. The EU CONCERTO project Class 1 - Demonstrating cost-effective low-energy buildings - Recent results with special focus on comparison of calculated and measured energy performance of Danish buildings

    DEFF Research Database (Denmark)

    Mørck, Ove; Thomsen, K.E.; Rose, J.

    2012-01-01

    -chip heating plant has been added. The project demonstrates the benefits of ultra-low-energy buildings integrated with biomass- and solar heating energy supply. The CLASS1 project involves 4 other countries: Estonia, France, Italy and Romania. These countries develop training activities based on the results......In 2007 the Class1 project commenced. Originally, 442 dwellings were to be designed and constructed as "low-energy class 1" houses according to requirements set by the Municipality of Egedal/Denmark. This means that the energy consumption is 50% below the existing energy regulations. 65 dwellings...... and experiences gained from the Danish housing projects. This paper describes the comparisons between measured and calculated energy consumption in a social housing settlement and in a detached single-family house. Results show relatively large discrepancies between measured and calculated results...

  18. Gender Policies and Gender Inequalities in Health in Europe: Results of the SOPHIE Project.

    Science.gov (United States)

    Palència, Laia; De Moortel, Deborah; Artazcoz, Lucía; Salvador-Piedrafita, María; Puig-Barrachina, Vanessa; Hagqvist, Emma; Pérez, Glòria; Ruiz, Marisol E; Trujillo-Alemán, Sara; Vanroelen, Christophe; Malmusi, Davide; Borrell, Carme

    2017-01-01

    The aim of this article is to explain the results of the SOPHIE project regarding the effect of gender policies on gender inequalities in health in Europe. We start with the results of a systematic review on how gender regimes and gender equality policies at the country level impact women's health and gender inequalities in health. Then, we report on three empirical analyses on the relationship between different family policy models existing in Europe and gender inequalities in health. Finally we present four case studies on specific examples of gender policies or determinants of gender inequalities in health. The results show that policies that support women's participation in the labor force and decrease their burden of care, such as public services and support for families and entitlements for fathers, are related to lower levels of gender inequality in terms of health. In addition, public services and benefits for disabled and dependent people can reduce the burden placed on family caregivers and hence improve their health. In the context of the current economic crisis, gender equality policies should be maintained or improved. © The Author(s) 2016.

  19. First results of the CLIMOD project - prospects

    International Nuclear Information System (INIS)

    Junod, A.

    1981-01-01

    The area investigated extends from the mouth of the Aar at Waldshut and Basle, and between the Black Forest and the top of the Jura range. In this area there are some nuclear powerstations with cooling towers. The CLIMOD project tries to detect changes of present conditions due to the cooling tower and by other anthropogeneous effects, at least qualitatively. (DG) [de

  20. Results of the MITRA project: Monitoring and intervention for the transportation of dangerous goods

    International Nuclear Information System (INIS)

    Planas, E.; Pastor, E.; Presutto, F.; Tixier, J.

    2008-01-01

    The objective of the MITRA (monitoring and intervention for the transportation of dangerous goods) project was to prototype a new operational system for monitoring the transportation of dangerous goods in Europe based on regional responsibilities. This concept, based on systems used in air traffic control, aims to provide civil security centres with real-time knowledge of the position and contents of dangerous vehicles circulating in their area of responsibility, and, in the event of a dangerous situation, to issue warnings, alerts and crisis management information, thereby allowing intervention teams to react immediately with maximum safety. The project was funded by the European Commission under the 6th Framework Programme (STREP - specific targeted research project - under the Information Society Technologies priority). It started on 1 September 2004 and ended on 31 October 2006. This paper presents the results of this project and the conclusions derived from the field tests carried out in Germany and in the French/Spanish border region in order to test the proposed operational system

  1. Modelled and Observed Diurnal SST Signals: "SSTDV:R.EX.-IM.A.M." Project Preliminary Results

    DEFF Research Database (Denmark)

    Karagali, Ioanna; Høyer, Jacob; LeBorgne, Pierre

    2013-01-01

    This study presents some of the preliminary results from the ESA Support To Science Element (STSE) funded project on the Diurnal Variability of the Sea Surface Temperature, regarding its Regional Extend and Implications in Atmospheric Modelling (SSTDV:R.EX.–IM.A.M.). During this phase of the proj......This study presents some of the preliminary results from the ESA Support To Science Element (STSE) funded project on the Diurnal Variability of the Sea Surface Temperature, regarding its Regional Extend and Implications in Atmospheric Modelling (SSTDV:R.EX.–IM.A.M.). During this phase...

  2. Scientific results of the Viking Project

    International Nuclear Information System (INIS)

    Flinn, E.A.; Reid, G.C.; Csanady, G.

    1977-01-01

    The Viking space project launched two unmanned spacecraft to Mars in 1975 for scientific exploration with special emphasis on the search for life. Each spacecraft consisted of an orbiter and a lander. The landing sites were finally selected after the spacecraft were in orbit. Thirteen investigations were performed: three mapping experiments from the orbiter, one atmospheric investigation during the lander entry phase, eight experiments on the surface of the planet, and one using the spacecraft radio and radar systems. The experiments on the surface dealt principally with biology, chemistry, geology, and meteorology. Seventy-eight scientists participated in the 13 teams performing these experiments. 53 individual articles make up this book

  3. Results from the European Integrated Project '' New Materials for Extreme Environments (ExtreMat) ''

    International Nuclear Information System (INIS)

    Bolt, H.; Linsmeier, Ch.; Baluc, N.; Garcia-Rosales, G.; Gualco, G. C.; Simancik, F.

    2006-01-01

    The goal of the European Integrated Project '' ExtreMat '' is to provide and to industrialize new materials and their compounds for applications in extreme environments that are beyond reach with incremental materials development only. The R(and)D activities in this project aim to provide a) self-passivating protection materials for sensitive structures operated in physico-chemically aggressive environments at high temperatures; b) new heat sink materials with the capability of very efficient heat removal, often at very high temperature level; c) radiation resistant materials for very high operation temperatures; d) new processing routes for complex heterogeneous compounds that can be operated in extreme environments. Key applications for these new materials are in the sectors of fusion, advanced fission, space, and electronic applications. Further use of these materials is expected in spin-off fields, such as brake applications and energy conversion. The project started in December 2004 for a duration of five years and is supported by the European Community. The 37 project participants are from 13 EU member states and include 6 universities, 7 research institutes, 10 research centres and 14 industrial companies. Research results regarding the development of materials for application in nuclear fusion, especially on protection, heat sink, and radiation resistant materials will be presented. A view to other applications of these materials in the fields of fission, space and electronics will be given in the presentation. ExtreMat Project Partners: see http://www.extremat.org/. (author)

  4. Use of Satellite SAR Data for Seismic Risk Management: Results from the Pre-Operational ASI-SIGRIS Project

    Science.gov (United States)

    Salvi, Stefano; Vignoli, Stefano; Zoffoli, Simona; Bosi, Vittorio

    2010-12-01

    The scope of the SIGRIS pilot project is the development of an infrastructure to provide value-added information services for the seismic risk management, assuring a close integration between ground-based and satellite Earth Observation data. The project is presently in the demonstration phase, and various information products are constantly generated and disseminated to the main user, the Italian Civil Protection Department. We show some examples of the products generated during the Crisis management of the 2009 L'Aquila earthquake in Central Italy. We also show an example of products generated for the Knowledge and Prevention service in support of the seismic hazard assessment in the area of the Straits of Messina.

  5. Analyzing how we do Analysis and Consume Data, Results from the SciDAC-Data Project

    Science.gov (United States)

    Ding, P.; Aliaga, L.; Mubarak, M.; Tsaris, A.; Norman, A.; Lyon, A.; Ross, R.

    2017-10-01

    One of the main goals of the Dept. of Energy funded SciDAC-Data project is to analyze the more than 410,000 high energy physics datasets that have been collected, generated and defined over the past two decades by experiments using the Fermilab storage facilities. These datasets have been used as the input to over 5.6 million recorded analysis projects, for which detailed analytics have been gathered. The analytics and meta information for these datasets and analysis projects are being combined with knowledge of their part of the HEP analysis chains for major experiments to understand how modern computing and data delivery is being used. We present the first results of this project, which examine in detail how the CDF, D0, NOvA, MINERvA and MicroBooNE experiments have organized, classified and consumed petascale datasets to produce their physics results. The results include analysis of the correlations in dataset/file overlap, data usage patterns, data popularity, dataset dependency and temporary dataset consumption. The results provide critical insight into how workflows and data delivery schemes can be combined with different caching strategies to more efficiently perform the work required to mine these large HEP data volumes and to understand the physics analysis requirements for the next generation of HEP computing facilities. In particular we present a detailed analysis of the NOvA data organization and consumption model corresponding to their first and second oscillation results (2014-2016) and the first look at the analysis of the Tevatron Run II experiments. We present statistical distributions for the characterization of these data and data driven models describing their consumption.

  6. Past and future of the Austrian snow cover - results from the CC-Snow project

    Science.gov (United States)

    Strasser, Ulrich; Marke, Thomas; Hanzer, Florian; Ragg, Hansjörg; Kleindienst, Hannes; Wilcke, Renate; Gobiet, Andreas

    2013-04-01

    This study has the goal to simulate the evolution of the Austrian snow cover from 1971 to 2050 by means of a coupled modelling scheme, and to estimate the effect of climate change on the evolution of the natural snow cover. The model outcomes are interepreted with focus on both the future natural snow conditions, and the effects on winter skiing tourism. Therefore the regional temperature-index snow model SNOWREG is applied, providing snow maps with a spatial resolution of 250 m. The model is trained by means of assimilating local measurements and observed natural snow cover patterns. Meteorological forcing consists of the output of four realizations of the ENSEMBLES project for the A1B emission scenario. The meteorological variables are downscaled and error corrected with a quantile based empirical-statistical method on a daily time basis. The control simulation is 1971-2000, and the scenario simulation 2021-2050. Spatial interpolation is performed on the basis of parameter-elevation relations. We compare the four different global/regional climate model combinations and their effect on the snow modelling, and we explain the patterns of the resulting snow cover by means of regional climatological characteristics. The provinces Tirol and Styria serve as test regions, being typical examples for the two climatic subregions of Austria. To support the interpretation of the simulation results we apply indicators which enable to define meaningful measures for the comparison of the different periods and regions. Results show that the mean duration of the snow cover will decrease by 15 to 30 days per winter season, mostly in elevations between 2000 and 2500 m. Above 3000 m the higher winter precipitation can compensate this effect, and mean snow cover duration may even slightly increase. We also investigate the local scale by application of the physically based mountain snow model AMUNDSEN. This model is capable of producing 50 m resolution output maps for indicators

  7. Search Results | Page 642 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Search Results. Showing 6411 - 6420 of 9601 results. Project ... STI for Development in Asia : a Platform for Information Sharing and Learning. This project is based on the premise that science, technology and innovation (STI) are critical ...

  8. Visual Literacy and Science Education: Results of a Qualitative Research Project

    Directory of Open Access Journals (Sweden)

    Regula Fankhauser

    2008-10-01

    Full Text Available In the didactics of science the role of pictures—mainly photographs and diagrams—as learning media and their function in the acquisition of knowledge have been discussed. However, the specific problems understanding pictures have seldom been reflected systematically. The aim of the project described in this paper was to address this deficiency. In a first step I refer to theoretical concepts of understanding pictures that were generated within the context of qualitative social research. Next I generate a theoretical model of visual literacy. The focus is on the understanding of pictures used in science education. The model includes aesthetic, epistemological, technical, and pragmatic dimensions. This model was then empirically tested. Thirty-five students were interviewed regarding their reception of scientific pictures. The results reveal that students have difficulties in describing the aesthetic features of pictures. The interviews clarified the epistemological frame theory on which picture understanding is based: most of the students consider the picture as a realistic copy of the object represented. Only a few students showed a more constructivist frame theory. Furthermore, the results revealed no connection between the epistemological theory and the technical knowledge of the students. The discussion of the design and the method of interpretation reflects the results of the study; the students' patterns of picture understanding are surprisingly homogeneous. On the one hand this could be reduced to the method of content analysis; on the other hand it could be an effect of the single sided view of the design. I explored only the subjective reception of pictures. Further research must consider other perspectives and focus on the way teachers work with visual material in classroom teaching. URN: urn:nbn:de:0114-fqs090129

  9. The TROY project: Searching for co-orbital bodies to known planets. I. Project goals and first results from archival radial velocity

    Science.gov (United States)

    Lillo-Box, J.; Barrado, D.; Figueira, P.; Leleu, A.; Santos, N. C.; Correia, A. C. M.; Robutel, P.; Faria, J. P.

    2018-01-01

    Context. The detection of Earth-like planets, exocomets or Kuiper belts show that the different components found in the solar system should also be present in other planetary systems. Trojans are one of these components and can be considered fossils of the first stages in the life of planetary systems. Their detection in extrasolar systems would open a new scientific window to investigate formation and migration processes. Aims: In this context, the main goal of the TROY project is to detect exotrojans for the first time and to measure their occurrence rate (η-Trojan). In this first paper, we describe the goals and methodology of the project. Additionally, we used archival radial velocity data of 46 planetary systems to place upper limits on the mass of possible trojans and investigate the presence of co-orbital planets down to several tens of Earth masses. Methods: We used archival radial velocity data of 46 close-in (P 1σ evidence for a mass imbalance between L4 and L5. Two of these systems provide >2σ detection, but no significant detection is found among our sample. We also report upper limits to the masses at L4/L5 in all studied systems and discuss the results in the context of previous findings. Radial velocity data are only available at the CDS via anonymous ftp to cdsarc.u-strasbg.fr (130.79.128.5) or via http://cdsarc.u-strasbg.fr/viz-bin/qcat?J/A+A/609/A96

  10. Main results from NILU`s participation in the TOR project; Hovedresultater fra NILUs deltakelse i TOR-prosjektet

    Energy Technology Data Exchange (ETDEWEB)

    Solberg, S; Stordahl, F

    1996-01-01

    The conference paper presents the main results from the Norwegian participation in the TOR (Tropospheric Ozone Research) project. The project was a part of the EUROTRAC environment programme which terminated in 1995. The aim of the TOR project was to increase the knowledge on physical and chemical processes being important for the consentration of ozone in the troposphere. 2 refs., 3 figs.

  11. In-house coordination project for organ and tissue procurement: social responsibility and promising results.

    Science.gov (United States)

    Silva, Vanessa Silva E; Moura, Luciana Carvalho; Martins, Luciana Ribeiro; Santos, Roberta Cristina Cardoso Dos; Schirmer, Janine; Roza, Bartira de Aguiar

    2016-01-01

    to report the results of evaluation regarding changes in the number of potential donor referrals, actual donors, and conversion rates after the implementation of an in-house organ and tissue donation for transplantation coordination project. epidemiological study, both retrospective and transversal, was performed with organ donation data from the Secretariat of Health for the State and the in-house organ donation coordination project of a beneficent hospital. The data was compared using nonparametric statistical Mann-Whitney test, and the Student's t-test, considering a significance level of 5% (p <0.05). there were statistically significant differences (p < 0.05), before and after the implementation of the project on the number of potential donor notification/month (3.05 - 4.7 ), number of actual donor/month (0.78 to 1.60) and rate of conversion ( 24.7 to 34.8 %). The hospitals 1, 2, 7 and 8 had significant results in potential donor, actual donor or conversion rate. the presence of an in-house coordinator is promising and beneficial, the specialist is important to change the indicators of efficiency, which consequently reduces the waiting lists for organ transplants.

  12. Generation IV and transmutation materials (GETMAT) project: First assessment of selected results

    International Nuclear Information System (INIS)

    Fazio, Concetta; Serrano, Marta; Gessi, Alessandro; Henry, Jean; Malerba, Lorenzo

    2015-01-01

    The Generation IV and Transmutation Material (GETMAT) project has been initiated within the 7. EURATOM framework programme with the objective to support the development of innovative reactor designs. Emphasis has been put on the investigation, both in the theoretical and experimental domains, of selected material properties that are cross-cutting among the various Generation IV and Transmutation systems. The selection of the properties to be investigated has been performed by identifying relevant conditions of key components as cores and primary systems. Moreover, taking into account the envisaged conditions of these components it turned out that innovative materials might be a better choice with respect to conventional nuclear grade steels. Therefore, ODS alloys and 9-12 Cr Ferritic/Martensitic (F/M) steels have been selected as reference for the GETMAT project. The R and D activities have been focused on basic characterisation of ODS alloys produced ad hoc for the project and on an extensive PIE programme of F/M steels irradiated in previous programmes. Finally, first principle modelling studies to explain irradiation hardening and embrittlement of F/M alloys were an additional important task. The objective of this manuscript is to make a first assessment of the results obtained within GETMAT. (authors)

  13. Development of Distributed Research Center for monitoring and projecting regional climatic and environmental changes: first results

    Science.gov (United States)

    Gordov, Evgeny; Shiklomanov, Alexander; Okladinikov, Igor; Prusevich, Alex; Titov, Alexander

    2016-04-01

    Description and first results of the cooperative project "Development of Distributed Research Center for monitoring and projecting of regional climatic and environmental changes" recently started by SCERT IMCES and ESRC UNH are reported. The project is aimed at development of hardware and software platform prototype of Distributed Research Center (DRC) for monitoring and projecting regional climatic and environmental changes over the areas of mutual interest and demonstration the benefits of such collaboration that complements skills and regional knowledge across the northern extratropics. In the framework of the project, innovative approaches of "cloud" processing and analysis of large geospatial datasets will be developed on the technical platforms of two U.S. and Russian leading institutions involved in research of climate change and its consequences. Anticipated results will create a pathway for development and deployment of thematic international virtual research centers focused on interdisciplinary environmental studies by international research teams. DRC under development will comprise best features and functionality of earlier developed by the cooperating teams' information-computational systems RIMS (http://rims.unh.edu) and CLIMATE(http://climate.scert.ru/), which are widely used in Northern Eurasia environment studies. The project includes several major directions of research (Tasks) listed below. 1. Development of architecture and defining major hardware and software components of DRC for monitoring and projecting of regional environmental changes. 2. Development of an information database and computing software suite for distributed processing and analysis of large geospatial data hosted at ESRC and IMCES SB RAS. 3. Development of geoportal, thematic web client and web services providing international research teams with an access to "cloud" computing resources at DRC; two options will be executed: access through a basic graphical web browser and

  14. Distribution automation and control support; Analysis and interpretation of DAC working group results for use in project planning

    Science.gov (United States)

    Klock, P.; Evans, D.

    1979-01-01

    The Executive Summary and Proceedings of the Working Group Meeting was analyzed to identify specific projects appropriate for Distribution Automation and Control DAC RD&D. Specific projects that should be undertaken in the DAC RD&D program were recommended. The projects are presented under broad categories of work selected based on ESC's interpretation of the results of the Working Group Meeting. Some of the projects are noted as utility industry projects. The ESC recommendations regarding program management are presented. Utility versus Government management responsibilities are noted.

  15. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  16. Chicago's urban forest ecosystem: results of the Chicago Urban Forest Climate Project

    Science.gov (United States)

    Gregory E. McPherson; David J. Nowak; Rowan A. Rowntree

    1994-01-01

    Results of the 3-year Chicago Urban Forest Climate Project indicate that there are an estimated 50.8 million trees in the Chicago area of Cook and DuPage Counties; 66 percent of these trees rated in good or excellent condition. During 1991, trees in the Chicago area removed an estimated 6,145 tons of air pollutants, providing air cleansing valued at $9.2 million...

  17. Evaluation of DNA microarray results in the Toxicogenomics Project (TGP) consortium in Japan.

    Science.gov (United States)

    Noriyuki, Nakatsu; Igarashi, Yoshinobu; Ono, Atsushi; Yamada, Hiroshi; Ohno, Yasuo; Urushidani, Tetsuro

    2012-01-01

    An important technology used in toxicogenomic drug discovery research is the microarray, which enables researchers to simultaneously analyze the expression of a large number of genes. To build a database and data analysis system for use in assessing the safety of drugs and drug candidates, in 2002 we conducted a 5-year collaborative study in the Toxicogenomics Project (TGP1) in Japan. Experimental data generated by such studies must be validated by different laboratories for robust and accurate analysis. For this purpose, we conducted intra- and inter-laboratory validation studies with participating companies in the second collaborative study in the Toxicogenomics Project (TGP2). Gene expression in the liver of rats treated with acetaminophen (APAP) was independently examined by the participating companies using Affymetrix GeneChip microarrays. The intra- and inter-laboratory reproducibility of the data was evaluated using hierarchical clustering analysis. The toxicogenomics results were highly reproducible, indicating that the gene expression data generated in our TGP1 project is reliable and compatible with the data generated by the participating laboratories.

  18. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    Science.gov (United States)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  19. Initial results of the mexican participation in the Alpha Magnetic Spectrometer Project

    International Nuclear Information System (INIS)

    Belmont M, E.; Menchaca R, A.; Sandoval, A.; Alfaro, R.; Martinez D, A.; Grabski, V.

    2007-01-01

    Mexico is part of the AMS (Alpha Magnetic Spectrometer) project, consisting of several radiation detectors integrated in a single telescope to be sent to the outer space in search of antimatter. One of those detectors is a RICH (Ring Imaging Cherenkov), where the cosmic particle's speed is calculated from the Cherenkov light-rings observed. The IF-UNAM group works in characterizing the silica aerogel used as luminous element in this detector. Because the spectrometer will be in orbit for several years, some particular studies are necessary. Our group works on possible ageing mechanisms, showing that the main threat to this material is contamination rather than thermal, or vacuum, shocks. (Author)

  20. Trace of the 'Fugen' project. Its technical development results to be succeeded

    International Nuclear Information System (INIS)

    Ishikure, Kenkichi; Kikuchi, Saburo; Kobayashi, Hiromasa; Hino, Minoru

    2003-01-01

    A prototype reactor of the advanced thermal reactor (ATR), 'Fugen' will be finished its operation on March, 2003. And, the 'Fugen' project advanced by self technology development has largely contributed to nuclear energy development in Japan at various fields. Nuclear energy is now laid at change of its environment without previous experiences, such as relaxation of regulation, liberalization of electric powers, cost down, and so on. A history on challenge of self technology development must be valuable experiences essential for present and future nuclear energy. To succeed results with and without shapes obtained by the 'Fugen', to generation sharing coming future, here were investigated verifications on its technical results and self technology development results and how their results are activated to future. (G.K.)

  1. Lessons Learned and Flight Results from the F15 Intelligent Flight Control System Project

    Science.gov (United States)

    Bosworth, John

    2006-01-01

    A viewgraph presentation on the lessons learned and flight results from the F15 Intelligent Flight Control System (IFCS) project is shown. The topics include: 1) F-15 IFCS Project Goals; 2) Motivation; 3) IFCS Approach; 4) NASA F-15 #837 Aircraft Description; 5) Flight Envelope; 6) Limited Authority System; 7) NN Floating Limiter; 8) Flight Experiment; 9) Adaptation Goals; 10) Handling Qualities Performance Metric; 11) Project Phases; 12) Indirect Adaptive Control Architecture; 13) Indirect Adaptive Experience and Lessons Learned; 14) Gen II Direct Adaptive Control Architecture; 15) Current Status; 16) Effect of Canard Multiplier; 17) Simulated Canard Failure Stab Open Loop; 18) Canard Multiplier Effect Closed Loop Freq. Resp.; 19) Simulated Canard Failure Stab Open Loop with Adaptation; 20) Canard Multiplier Effect Closed Loop with Adaptation; 21) Gen 2 NN Wts from Simulation; 22) Direct Adaptive Experience and Lessons Learned; and 23) Conclusions

  2. Linked open data creating knowledge out of interlinked data : results of the LOD2 project

    CERN Document Server

    Bryl, Volha; Tramp, Sebastian

    2014-01-01

    Linked Open Data (LOD) is a pragmatic approach for realizing the Semantic Web vision of making the Web a global, distributed, semantics-based information system. This book presents an overview on the results of the research project “LOD2 -- Creating Knowledge out of Interlinked Data”. LOD2 is a large-scale integrating project co-funded by the European Commission within the FP7 Information and Communication Technologies Work Program. Commencing in September 2010, this 4-year project comprised leading Linked Open Data research groups, companies, and service providers from across 11 European countries and South Korea. The aim of this project was to advance the state-of-the-art in research and development in four key areas relevant for Linked Data, namely 1. RDF data management; 2. the extraction, creation, and enrichment of structured RDF data; 3. the interlinking and fusion of Linked Data from different sources and 4. the authoring, exploration and visualization of Linked Data.

  3. Locale-Specific Categorization of IT Projects for Proper Project Management

    Directory of Open Access Journals (Sweden)

    Muhammad Nasir

    2015-12-01

    Full Text Available In this paper we aim to show that not only are the project management techniques important for small-scale projects, but following proper project management techniques is one of the most important requirements. However, there come slight variations in implementing project management techniques in small projects as compared with larger projects. Therefore, proper categorization of projects holds the key to success in many situations. Our paper will show that categorization of a project as small-scale or large-scale should always be locale specific. In this regards, we develop a criteria and evaluate how the projects are categorized as small-scale and large-scale in different parts of the world with focus on IT projects. This research concludes that some methods cannot be used for projects of different scales.

  4. The Research of Stakeholder Power Impact on Project Implementation

    Directory of Open Access Journals (Sweden)

    Artur Biskupek

    2016-12-01

    Full Text Available Purpose of the article: The article show summarized information about stakeholders and their role in project implementation based on literature review. The second part of the article is dedicated for the research about stakeholder influence on project implementation. The only condition to participate in the survey was managing projects. Although the respondents are employed in the area of south Poland, they implement projects all over Poland. The research tool was a questionnaire which was sent by e-mail to the respondents. 90 project managers from the area of south Poland were invited to join the project, and 62 people sent back a completed questionnaire. Methodology/methods: The research was done by a questionnaire with twenty two question, which was divided into three parts. The first part was the imprint, which consisted of three questions. The second part consisted of two questions, which concerned the way of defining the word “stakeholder”. The third part concerned the topic of the research and consisted of seventeen questions. Scientific aim: The aim of the article is presenting the results of the research which was done, to show the research results of project stakeholder influence on the project implementation. Findings: The results received from the survey in the process of analysis and interpretation allow to put forward a thesis that stakeholders as a whole group are significant for the implementation of the whole project. Their impact is so important that it is possible to tell that they decide also about the project success or failure. Conclusions: The respondents show that stakeholders affect every area in large extent or very big extent. The fact has been proved in table 1 which shows the most frequently chosen answers by responders. However, by conducted analysis by the standard deviation it is possible to see a large dispersion of the results.

  5. Sudbury project (University of Muenster-Ontario Geological Survey): Summary of results - an updated impact model

    Science.gov (United States)

    Avermann, M.; Bischoff, L.; Brockmeyer, P.; Buhl, D.; Deutsch, A.; Dressler, B. O.; Lakomy, R.; Mueller-Mohr, V.; Stoeffler, D.

    1992-01-01

    In 1984 the Ontario Geological Survey initiated a research project on the Sudbury structure (SS) in cooperation with the University of Muenster. The project included field mapping (1984-1989) and petrographic, chemical, and isotope analyses of the major stratigraphic units of the SS. Four diploma theses and four doctoral theses were performed during the project (1984-1992). Specific results of the various investigations are reported. Selected areas of the SS were mapped and sampled: Footwall rocks; Footwall breccia and parts of the sublayer and lower section of the Sudbury Igneous Complex (SIC); Onaping Formation and the upper section of the SIC; and Sudbury breccia and adjacent Footwall rocks along extended profiles up to 55 km from the SIC. All these stratigraphic units of the SS were studied in substantial detail by previous workers. The most important characteristic of the previous research is that it was based either on a volcanic model or on a mixed volcanic-impact model for the origin of the SS. The present project was clearly directed toward a test of the impact origin of the SS without invoking an endogenic component. In general, our results confirm the most widely accepted stratigraphic division of the SS. However, our interpretation of some of the major stratigraphic units is different from most views expressed. The stratigraphy of the SS and its new interpretation is given as a basis for discussion.

  6. ORGANIZATIONAL PROJECT MANAGEMENT MATURITY

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2017-11-01

    Full Text Available The present article is aimed at developing a set of recommendations for achieving a higher level of organizational project maturity at a given enterprise. Methodology. For the purposes of the current research, the available information sources on the components of project management system are analysed; the essence of “organizational maturity” and the existing models of organizational maturity are studied. The method of systemic and structural analysis, as well as the method of logical generalization, are employed in order to study the existing models of organizational maturity, to describe levels of organizational maturity, and finally to develop a set of methodological recommendations for achieving a higher level of organizational project maturity at a given enterprise. The results of the research showed that the core elements of project management system are methodological, organizational, programtechnical, and motivational components. Project management encompasses a wide range of issues connected with organizational structure, project team, communication management, project participants, etc. However, the fundamental basis for developing project management concept within a given enterprise starts with defining its level of organizational maturity. The present paper describes various models of organizational maturity (staged, continuous, petal-shaped and their common types (H. Кеrzner Organizational Maturity Model, Berkeley PM Maturity Model, Organizational Project Management Maturity Model, Portfolio, Program & Project Management Maturity Model. The analysis of available theoretic works showed that the notion “organizational project maturity” refers to the capability of an enterprise to select projects and manage them with the intention of achieving its strategic goals in the most effective way. Importantly, the level of maturity can be improved by means of formalizing the acquired knowledge, regulating project-related activities

  7. A projection-free method for representing plane-wave DFT results in an atom-centered basis

    International Nuclear Information System (INIS)

    Dunnington, Benjamin D.; Schmidt, J. R.

    2015-01-01

    Plane wave density functional theory (DFT) is a powerful tool for gaining accurate, atomic level insight into bulk and surface structures. Yet, the delocalized nature of the plane wave basis set hinders the application of many powerful post-computation analysis approaches, many of which rely on localized atom-centered basis sets. Traditionally, this gap has been bridged via projection-based techniques from a plane wave to atom-centered basis. We instead propose an alternative projection-free approach utilizing direct calculation of matrix elements of the converged plane wave DFT Hamiltonian in an atom-centered basis. This projection-free approach yields a number of compelling advantages, including strict orthonormality of the resulting bands without artificial band mixing and access to the Hamiltonian matrix elements, while faithfully preserving the underlying DFT band structure. The resulting atomic orbital representation of the Kohn-Sham wavefunction and Hamiltonian provides a gateway to a wide variety of analysis approaches. We demonstrate the utility of the approach for a diverse set of chemical systems and example analysis approaches

  8. Relation of project managers' personality and project performance: An approach based on value stream mapping

    Directory of Open Access Journals (Sweden)

    Maurizio Bevilacqua

    2014-09-01

    Full Text Available Purpose: This work investigates the influence of project managers’ personality on the success of a project in a Multinational Corporation. The methodology proposed for analyzing the project managers’ personality is based on the Myers-Briggs Type Indicator.Design/methodology/approach: Forty projects carried out in 2012 by multinational corporation, concerning new product development (NPD, have been analyzed, comparing the profile of project managers with results obtained in terms of traditional performance indexes (time delay and over-budget of projects and performance indexes usually used in “Lean Production” sector (waste time and type of “wastes”. A detailed analysis of the most important “wastes” during the project development is carried out using the Value Stream Mapping (VSM technique.Findings and Originality/value: Relying on the Myers–Briggs personality instrument, results show that extroverted managers (as opposed to introverted managers carry out projects that show lower delay and lower waste time. Introverted managers often make “Over-processing” and “Defect” types of waste. Moreover, lower delay and over-budget have been shown by perceiving managers.Research limitations: Regarding the limitations of this work it is necessary to highlight that we collected data from project managers in a retrospective way. While we believe that several aspects of our data collection effort helped enhance the accuracy of the results, future research could conduct real-time case study research to get more detailed insights into the proposed relationships and avoid retrospective bias. Moreover we focused on a single respondent, the project manager. This helped us ensure that their interpretations played an important role in product development. But, we cannot examined the opinion of team members that could be different from project managers opinion regarding some questions.Originality/value: This research provides insight useful

  9. Harnessing opportunities for good governance of health impacts of mining projects in Mongolia: results of a global partnership.

    Science.gov (United States)

    Pfeiffer, Michaela; Vanya, Delgermaa; Davison, Colleen; Lkhagvasuren, Oyunaa; Johnston, Lesley; Janes, Craig R

    2017-06-27

    The Sustainable Development Goals call for the effective governance of shared natural resources in ways that support inclusive growth, safeguard the integrity of the natural and physical environment, and promote health and well-being for all. For large-scale resource extraction projects -- e.g. in the mining sector -- environmental regulations and in particular environmental impact assessments (EIA) provide an important but insufficiently developed avenue to ensure that wider sustainable development issues, such as health, have been considered prior to the permitting of projects. In recognition of the opportunity provided in EIA to influence the extent to which health issues would be addressed in the design and delivery of mining projects, an international and intersectoral partnership, with the support of WHO and public funds from Canadian sources, engaged over a period of six years in a series of capacity development activities and knowledge translation/dissemination events aimed at influencing policy change in the extractives sector so as to include consideration of human health impacts. Early efforts significantly increased awareness of the need to include health considerations in EIAs. Coupling effective knowledge translation about health in EIA with the development of networks that fostered good intersectoral partnerships, this awareness supported the development and implementation of key pieces of legislation. These results show that intersectoral collaboration is essential, and must be supported by an effective conceptual understanding about which methods and models of impact assessment, particularly for health, lend themselves to integration within EIA. The results of our partnership demonstrate that when specific conditions are met, integrating health into the EIA system represents a promising avenue to ensure that mining activities contribute to wider sustainable development goals and objectives.

  10. Is a Clean Development Mechanism project economically justified? Case study of an International Carbon Sequestration Project in Iran.

    Science.gov (United States)

    Katircioglu, Salih; Dalir, Sara; Olya, Hossein G

    2016-01-01

    The present study evaluates a carbon sequestration project for the three plant species in arid and semiarid regions of Iran. Results show that Haloxylon performed appropriately in the carbon sequestration process during the 6 years of the International Carbon Sequestration Project (ICSP). In addition to a high degree of carbon dioxide sequestration, Haloxylon shows high compatibility with severe environmental conditions and low maintenance costs. Financial and economic analysis demonstrated that the ICSP was justified from an economic perspective. The financial assessment showed that net present value (NPV) (US$1,098,022.70), internal rate of return (IRR) (21.53%), and payback period (6 years) were in an acceptable range. The results of the economic analysis suggested an NPV of US$4,407,805.15 and an IRR of 50.63%. Therefore, results of this study suggest that there are sufficient incentives for investors to participate in such kind of Clean Development Mechanism (CDM) projects.

  11. Projected coupled cluster theory.

    Science.gov (United States)

    Qiu, Yiheng; Henderson, Thomas M; Zhao, Jinmo; Scuseria, Gustavo E

    2017-08-14

    Coupled cluster theory is the method of choice for weakly correlated systems. But in the strongly correlated regime, it faces a symmetry dilemma, where it either completely fails to describe the system or has to artificially break certain symmetries. On the other hand, projected Hartree-Fock theory captures the essential physics of many kinds of strong correlations via symmetry breaking and restoration. In this work, we combine and try to retain the merits of these two methods by applying symmetry projection to broken symmetry coupled cluster wave functions. The non-orthogonal nature of states resulting from the application of symmetry projection operators furnishes particle-hole excitations to all orders, thus creating an obstacle for the exact evaluation of overlaps. Here we provide a solution via a disentanglement framework theory that can be approximated rigorously and systematically. Results of projected coupled cluster theory are presented for molecules and the Hubbard model, showing that spin projection significantly improves unrestricted coupled cluster theory while restoring good quantum numbers. The energy of projected coupled cluster theory reduces to the unprojected one in the thermodynamic limit, albeit at a much slower rate than projected Hartree-Fock.

  12. Economic and Social Sustainability Performance of Jatropha Projects: Results from Field Surveys in Mozambique, Tanzania and Mali

    Directory of Open Access Journals (Sweden)

    Henny Romijn

    2014-09-01

    Full Text Available This paper presents results from comprehensive field surveys of jatropha projects in Mozambique, Tanzania and Mali in 2012. The article singles out the salient economic and social impact results and derives lessons. The results clearly demonstrate the weak business case for jatropha biofuel production at this time. Plantations were found to be unviable because of insurmountable up-front capital requirements in combination with slow and unreliable crop maturation, inefficient oil pressing owing to a lack of scale and experience, inadequate utilization of by-products, and competitively-priced fossil diesel and palm oil. For smallholders, jatropha only has limited value as a hedge crop in environmentally and economically disadvantaged areas. Better prospects have to wait for the advent of improved jatropha varieties. Social impacts from the perspective of project managers were rather mixed: overall, food security perceptions were positive and no massive forced human displacements were noted so far, though some disputes over land access and compensation were reported. Labor legislation was apparently respected on plantations, and positive gender effects, regional income/employment effects and better public facilities were also reported. The projects generated considerable employment, albeit mostly of a temporary nature, as lack of economic viability had caused many projects to close down again. When introducing next-generation biofuel projects, better monitoring by various actor groups is recommended, as well as long-term investment plans that include integral exit strategies.

  13. Benchmarking Sustainability Practices Use throughout Industrial Construction Project Delivery

    Directory of Open Access Journals (Sweden)

    Sungmin Yun

    2017-06-01

    Full Text Available Despite the efforts for sustainability studies in building and infrastructure construction, the sustainability issues in industrial construction remain understudied. Further, few studies evaluate sustainability and benchmark sustainability issues in industrial construction from a management perspective. This study presents a phase-based benchmarking framework for evaluating sustainability practices use focusing on industrial facilities project. Based on the framework, this study quantifies and assesses sustainability practices use, and further sorts the results by project phase and major project characteristics, including project type, project nature, and project delivery method. The results show that sustainability practices were implemented higher in the construction and startup phases relative to other phases, with a very broad range. An assessment by project type and project nature showed significant differences in sustainability practices use, but no significant difference in practices use by project delivery method. This study contributes to providing a benchmarking method for sustainability practices in industrial facilities projects at the project phase level. This study also discusses and provides an application of phase-based benchmarking for sustainability in industrial construction.

  14. Initial Results from the New Stress Map of Texas Project

    Science.gov (United States)

    Lund Snee, J. E.; Zoback, M. D.

    2015-12-01

    Modern techniques for characterizing tectonic stress orientation and relative magnitude have been successfully used for more than 35 years. Nevertheless, large areas of North America lack high spatial resolution maps of stress orientation, magnitude, and faulting regime. In Texas, for example, data are foundational elements of attempts to characterize tectonic driving forces, understand hazards associated with induced seismicity, and optimize production of oil, gas, and geothermal resources. This year, we launched the Texas Stress Map project to characterize tectonic stress patterns at higher spatial resolution across Texas and nearby areas. Following a successful effort just completed in Oklahoma, we will evaluate borehole breakouts, drilling-induced tensile fractures, shear wave anisotropy, and earthquake data. The principal data source will be FMI (fullbore formation microimager), UBI (ultrasonic borehole imager), cross-dipole sonic, density, and caliper logs provided by private industry. Earthquake moment tensor solutions from the U.S. Geological Survey, Saint Louis University and other sources will also be used. Our initial focus is on the Permian Basin and Barnett Shale petroleum plays due to the availability of data, but we will expand our analysis across the state as the project progresses. In addition, we hope to eventually apply the higher spatial resolution data coverage to understanding tectonic and geodynamic characteristics of the southwestern United States and northeastern Mexico. Here we present early results from our work to constrain stress orientations and faulting regime in and near Texas, and we also provide a roadmap for the ongoing research.

  15. Severe accident assessment. Results of the reactor safety research project VAHTI

    International Nuclear Information System (INIS)

    Sairanen, R.

    1997-10-01

    The report provides a summary of the publicly funded nuclear reactor safety research project Severe Accident Management (VAHTI). The project has been conducted at the Technical Research Centre of Finland (VTT) during the years 1994-96. The main objective was to assist the severe accident management programmes of the Finnish nuclear power plants. The project was divided into five work packages: (1) thermal hydraulic validation of the APROS code, (2) core melt progression within a BWR pressure vessel, (3) failure mode of the BWR pressure vessel, (4) Aerosol behaviour experiments, and (5) development of a computerized severe accident training tool

  16. How is success or failure in river restoration projects evaluated? Feedback from French restoration projects.

    Science.gov (United States)

    Morandi, Bertrand; Piégay, Hervé; Lamouroux, Nicolas; Vaudor, Lise

    2014-05-01

    Since the 1990s, French operational managers and scientists have been involved in the environmental restoration of rivers. The European Water Framework Directive (2000) highlights the need for feedback from restoration projects and for evidence-based evaluation of success. Based on 44 French pilot projects that included such an evaluation, the present study includes: 1) an introduction to restoration projects based on their general characteristics 2) a description of evaluation strategies and authorities in charge of their implementation, and 3) a focus on the evaluation of results and the links between these results and evaluation strategies. The results show that: 1) the quality of an evaluation strategy often remains too poor to understand well the link between a restoration project and ecological changes; 2) in many cases, the conclusions drawn are contradictory, making it difficult to determine the success or failure of a restoration project; and 3) the projects with the poorest evaluation strategies generally have the most positive conclusions about the effects of restoration. Recommendations are that evaluation strategies should be designed early in the project planning process and be based on clearly-defined objectives. Copyright © 2014 Elsevier Ltd. All rights reserved.

  17. First results of the SOAP project. Open access publishing in 2010

    CERN Document Server

    Dallmeier-Tiessen, Suenje; Goerner, Bettina; Hyppoelae, Jenni; Igo-Kemenes, Peter; Kahn, Deborah; Lambert, Simon; Lengenfelder, Anja; Leonard, Chris; Mele, Salvatore; Polydoratou, Panayiota; Ross, David; Ruiz-Perez, Sergio; Schimmer, Ralf; Swaisland, Mark; van der Stelt, Wim

    2010-01-01

    The SOAP (Study of Open Access Publishing) project has compiled data on the present offer for open access publishing in online peer-reviewed journals. Starting from the Directory of Open Access Journals, several sources of data are considered, including inspection of journal web site and direct inquiries within the publishing industry. Several results are derived and discussed, together with their correlations: the number of open access journals and articles; their subject area; the starting date of open access journals; the size and business models of open access publishers; the licensing models; the presence of an impact factor; the uptake of hybrid open access.

  18. Complementarity of technical skills with art and culture: theoretical reflections, the Talent Show Project experiment at IFRJ – campus Realengo and a proposal for its expansion

    Directory of Open Access Journals (Sweden)

    Maria Célia Dantas Pollig

    2016-12-01

    Full Text Available This paper presents the theoretical basis I have used to better understand the dimension of the task I intend to accomplish. As Educational Advisor at the Federal Institute of Education, Science and Technology of Rio de Janeiro (IFRJ, campus Realengo, my plan is to develop and expand the so called Talent Show Project, by complementing technical training, and providing opportunities for artistic and cultural expression. The study also presents several reflections for achieving the expansion of the scope of the Project intervention, which can become an institutional program developed at IFRJ.

  19. Project Half Double: Current Results of Phase 1 and Phase 2, December 2017

    DEFF Research Database (Denmark)

    Svejvig, Per; Thorp Adland, Karoline; Zippora Klein, Judith Birte

    ’s competitiveness and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “Projects in half the time with double the impact” where projects in half the time should be understood as half the time to impact (benefit realization, effect is achieved) and not as half the time...... of Project Half Double was initiated in June 2015. It is a two-phase project: phase 1 took place from June 2015 to June 2016 with seven pilot projects, and phase 2 is in progress from July 2016 to July 2018 with 10 pilot projects. The Half Double consortium: Implement Consulting Group is the project leader....... 2016, Svejvig et al. 2017). This report’s target group inludes practitioners in Danish industry and society in general. The editorial team from Aarhus University prepared the report from October 2017 to December 2017, which means that data about pilot projects from December 2017 is not included....

  20. Project Temporalities

    DEFF Research Database (Denmark)

    Tryggestad, Kjell; Justesen, Lise; Mouritsen, Jan

    2013-01-01

    Purpose – The purpose of this paper is to explore how animals can become stakeholders in interaction with project management technologies and what happens with project temporalities when new and surprising stakeholders become part of a project and a recognized matter of concern to be taken...... into account. Design/methodology/approach – The paper is based on a qualitative case study of a project in the building industry. The authors use actor-network theory (ANT) to analyze the emergence of animal stakeholders, stakes and temporalities. Findings – The study shows how project temporalities can...... multiply in interaction with project management technologies and how conventional linear conceptions of project time may be contested with the emergence of new non-human stakeholders and temporalities. Research limitations/implications – The study draws on ANT to show how animals can become stakeholders...

  1. NEOShield-2 Project: Final Results on Compositional Characterization of small NEOs

    Science.gov (United States)

    Barucci, Maria Antonieta; Perna, Davide; Fornasier, Sonia; Doressoundiram, Alain; Lantz, Cateline; Popescu, Marcel; Merlin, Frederic; Fulchignoni, Marcello

    2017-10-01

    NEOShield-2 project was selected in the framework of the European Commission H2020 program in answer to the call for “Access technologies and characterisation for Near Earth Objects (NEOs)”. NEOShield-2 project (2015-2017) is a follow-up of the first NEOShield (2012-2015) and includes 11 European Institutions and Industries. The main objectives of NEOShield-2 project are: i) technological development on techniques and instruments needed for GNC for possible asteroid missions and ii) characterization of NEOs of small sizes.Our team at LESIA is the leader of the entire observational program which involved complementary techniques to provide physical and compositional characterization of NEOs. Priority has been given to potential space-mission targets, optimized for mitigation or exploration missions. In this framework an agreement with the European Southern Observatory was signed to obtain Guaranteed Time Observations at the 3.6-meter NTT with an allocation of 30 nights to characterize by spectroscopy the composition of the smaller asteroids. The objects with an absolute magnitude larger than 20 were selected, with a priority for the very small newly discovered objects.We obtained more than 170 new spectra of NEOs. The observations were performed with EFOSC2 instrument. We covered the wavelength interval 0.4-0.92 microns, with a resolution of R=~200. The observed asteroids include 29 asteroids with diameters smaller than 100 meters and 71 with diameters between 100 and 300 m.The taxonomic type has been assigned for 137 individual objects. Our results on NEO mineralogical compositions provide a body of reference data directly applicable to the design and development of mitigation-relevant space missions. Within our survey, we found eight D-types with ΔV funding by European Commission Horizon 2020 program (contract No. PROTEC-2-2014-640351).

  2. Project risk as identity threat: explaining the development and consequences of risk discourse in an infrastructure project

    NARCIS (Netherlands)

    van Os, A.; van Berkel, F.J.F.W.; de Gilder, T.C.; van Dyck, C.; Groenewegen, P.

    2015-01-01

    This paper explores the role of social identity threat in risk discourse in an infrastructure project, and the consequences risk discourse has for cooperation between stakeholders. We show that risks posed a threat to the identity of the project team, resulting in a discourse focused on attributing

  3. An ABC analysis for power generation project

    OpenAIRE

    Batool Hasani; Younos Vakilalroaia

    2013-01-01

    One of the primary concerns on performance measurement is to know how much a particular project cost. However, using traditional method on project-based products often leads to inappropriate results. In this paper, we re-examine this issue by comparing the cost of a power station construction project using ABC versus traditional method. The results of survey show that ABC method is capable of providing better estimates for overhead costs compared with traditional method. In other words, ABC m...

  4. Methodology of impact assessment of research projects

    International Nuclear Information System (INIS)

    Rodriguez Cardona, R.; Cobas Aranda, M.

    2014-01-01

    In the context of the management of research projects development it is necessary to have tools to monitor and evaluate progress and the performance of the projects, as well as their results and the impact on society (international agencies of the United Nations and the States 2002 and 2005 Paris Declaration), with the objective of to ensure their contribution to the social and economic development of countries. Many organizations, agencies and Governments apply different methodologies (IDB, World Bank, UNDP, ECLAC, UNESCO; UNICEF, Canada, Japan, other) for these purposes. In the results-based project management system not only paramount is the process or product itself, but also the result or impact of the project (if the program/project produced the effects desired persons, households and institutions and whether those effects are attributable to the intervention of the program / project). The work shows a methodology that allows for a qualitative and quantitative evaluation of impact of research projects and has been result of experience in project management of international collaboration with the International Agency for Atomic Energy (IAEA) and the Cuban Nuclear programme. (author)

  5. Research Project Evaluation—Learnings from the PATHWAYS Project Experience

    Directory of Open Access Journals (Sweden)

    Aleksander Galas

    2018-05-01

    Full Text Available Background: Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project. The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project’s evaluation issues including: (1 purposes, (2 advisability, (3 tools, (4 implementation, and (5 possible benefits and presents the advantages of a continuous monitoring. Methods: Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S, Weaknesses (W, Opportunities (O, and Threats (SWOT analysis. Results: A methodology for longitudinal EU projects’ evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. Conclusions: There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  6. Assessing Historical and Projected Carbon Balance of Alaska: A Synthesis of Results and Policy/Management Implications.

    Science.gov (United States)

    McGuire, A David; Genet, Hélène; Lyu, Zhou; Pastick, Neal; Stackpoole, Sarah; Birdsey, Richard; D'Amore, David; He, Yujie; Rupp, T Scott; Striegl, Robert; Wylie, Bruce K; Zhou, Xiaoping; Zhuang, Qianlai; Zhu, Zhiliang

    2018-06-20

    We summarize the results of a recent interagency assessment of land carbon dynamics in Alaska, in which carbon dynamics were estimated for all major terrestrial and aquatic ecosystems for the historical period (1950-2009) and a projection period (2010-2099). Between 1950 and 2009, upland and wetland (i.e., terrestrial) ecosystems of the State gained 0.4 Tg C yr -1 (0.1% of net primary production, NPP), resulting in a cumulative greenhouse gas radiative forcing of 1.68 x 10 -3 W m -2 . The change in carbon storage is spatially variable with the region of the Northwest Boreal Landscape Conservation Cooperative (LCC) losing carbon because of fire disturbance. The combined carbon transport via various pathways through inland aquatic ecosystems of Alaska was estimated to be 41.3 Tg C yr -1 (17% of terrestrial NPP). During the projection period (2010-2099), carbon storage of terrestrial ecosystems of Alaska was projected to increase (22.5 to 70.0 Tg C yr -1 ), primarily because of NPP increases of 10 to 30% associated with responses to rising atmospheric CO 2 , increased nitrogen cycling, and longer growing seasons. Although carbon emissions to the atmosphere from wildfire and wetland CH 4 were projected to increase for all of the climate projections, the increases in NPP more than compensated for those losses at the statewide level. Carbon dynamics of terrestrial ecosystems continue to warm the climate for four of the six future projections, and cool the climate for only one of the projections. The attribution analyses we conducted indicated that the response of NPP in terrestrial ecosystems to rising atmospheric CO 2 (~5% per 100 ppmv CO 2 ) saturates as CO 2 increases (between approximately +150 and +450 ppmv among projections). This response, along with the expectation that permafrost thaw would be much greater and release large quantities of permafrost carbon after 2100, suggests that projected carbon gains in terrestrial ecosystems of Alaska may not be sustained

  7. Team-Based Learning for Nursing and Medical Students: Focus Group Results From an Interprofessional Education Project.

    Science.gov (United States)

    Feather, Rebecca A; Carr, Doug E; Reising, Deanna L; Garletts, Derrick M

    2016-01-01

    Past research indicates that inadequacies in health care delivery create substantial preventable quality issues that can be addressed through improving relationships among clinicians to decrease the negative effects on patient outcomes. The purpose of this article is to describe the implementation of an interprofessional education project with senior nursing and third-year medical students working in teams in a clinical setting. Results include data from focus groups conducted at the conclusion of the project.

  8. Experimental and Numerical Modeling of Fluid Flow Processes in Continuous Casting: Results from the LIMMCAST-Project

    Science.gov (United States)

    Timmel, K.; Kratzsch, C.; Asad, A.; Schurmann, D.; Schwarze, R.; Eckert, S.

    2017-07-01

    The present paper reports about numerical simulations and model experiments concerned with the fluid flow in the continuous casting process of steel. This work was carried out in the LIMMCAST project in the framework of the Helmholtz alliance LIMTECH. A brief description of the LIMMCAST facilities used for the experimental modeling at HZDR is given here. Ultrasonic and inductive techniques and the X-ray radioscopy were employed for flow measurements or visualizations of two-phase flow regimes occurring in the submerged entry nozzle and the mold. Corresponding numerical simulations were performed at TUBAF taking into account the dimensions and properties of the model experiments. Numerical models were successfully validated using the experimental data base. The reasonable and in many cases excellent agreement of numerical with experimental data allows to extrapolate the models to real casting configurations. Exemplary results will be presented here showing the effect of electromagnetic brakes or electromagnetic stirrers on the flow in the mold or illustrating the properties of two-phase flows resulting from an Ar injection through the stopper rod.

  9. A European neutron dosimetry intercomparison project (ENDIP). Results and evaluation

    International Nuclear Information System (INIS)

    Broerse, J.J.; Burger, G.; Coppola, M.

    1978-01-01

    A total of twenty groups from nine countries participated in sessions of the European Neutron Dosimetry Intercomparison Project (ENDIP) which were held during 1975 at GSF, Munich-Neuherberg and TNO, Rijswijk. The data of all participants are collected, the analysis and evaluation of the results are given in the present report. Specific chapters deal with the experimental arrangements and monitoring results at GSF and TNO, characteristics of the dosimetry systems employed by the paticipating groups and the basic physical data and correction factors employed for the determination of kerma and absorbed dose. In general, the participants in ENDIP quote systematic uncertainties of 7 to 8% in the neutron and total kerma or absorbed dose, which are mainly attributed to inadequate knowledge of basic constants. The variations in the results obtained by different participants seem to be in accordance with the relative large systematic uncertainties quoted. In order to determine the influence of the use of different values for the physical parameters, the relative responses of the participants' dosimeters have also been compared. The variances of quoted kerma and dose values are of the same order of magnitude as those of instrument responses. This result indicates inconsistencies in experimental techniques employed by the participants for the determination of kerma and absorbed dose. A separate nonparametric analysis of the ENDIP results confirmed that there are considerable systematic differences. Recommendations for future studies on neutron dosimetry for biological and medical applications are given at the end of the report

  10. Characterization of soil droughts in France and climate change. The ClimSec project: results and applications

    International Nuclear Information System (INIS)

    Soubeyroux, Jean-Michel; Blanchard, Michele; Dandin, Philippe; Kitova, Nadia; Martin, Eric; Vidal, Jean-Philippe

    2012-01-01

    The ClimSec project has studied the impact of climate change on drought and soil water over France by using a climatological reanalysis of the SAFRAN/ISBA/MODCOU suite (SIM) since 1958. Standardized drought indices for precipitation (SPI) and soil moisture (SSWI) have been defined for research purposes to characterize the various kinds of events. They were then adapted for operational hydrological monitoring and used to assess the exceptional drought of spring 2011. These indices were also calculated for future climate from the various regionalized climate projections available over France. Three particular experiments in socio-economic scenarios, climate models and down-scaling methods have been run to estimate the relative importance of the different uncertainties in drought evolution. The assessment of 21. century drought evolution shows a much earlier and more intense occurrence of changes for agricultural droughts linked to soil moisture deficits than for meteorological drought linked with precipitation deficits. Climate projections suggest that France could be affected on the second half of the 21. century by a quasi-continuous drought with a strong intensity, totally unknown in present climate. (authors)

  11. Problems of increased transport load as a result of implementation of projects of high-rise constructions

    Science.gov (United States)

    Provotorov, Ivan; Gasilov, Valentin; Anisimova, Nadezhda

    2018-03-01

    The structure of problems of high-rise construction us suggested, which includes the impact on environment, design solutions, transportation problems, financial costs for construction and operation, and others. Positive and negative aspects of high-rise construction are considered. One of the basic problems of high-rise construction is the problem of increased transport load. Construction of the subway on the basis of the concession mechanism, with the use of unmanned control of rolling stock is proposed as the most expedient solution. An evaluation of the effectiveness of this project is presented, it shows quite high performance indicators for a private investor. Main problems that the project implementation may face in conditions of lack of scientific and methodological support are outlined.

  12. Salton Sea Scientific Drilling Project: A summary of drilling and engineering activities and scientific results

    Energy Technology Data Exchange (ETDEWEB)

    Ross, H.P.; Forsgren, C.K. (eds.)

    1992-04-01

    The Salton Sea Scientific g Project (SSSDP) completed the first major well in the United States Continental Scientific Drilling Program. The well (State 2-14) was drilled to 10,W ft (3,220 m) in the Salton Sea Geothermal Field in California's Imperial Valley, to permit scientific study of a deep, high-temperature portion of an active geothermal system. The program was designed to investigate, through drilling and testing, the subsurface thermal, chemical, and mineralogical environments of this geothermal area. Extensive samples and data, including cores, cuttings, geothermal fluids and gases, and geophysical logs, were collected for future scientific analysis, interpretation, and publication. Short duration flow tests were conducted on reservoirs at a depth of approximately 6,120 ft (1,865 m) and at 10,136 ft (3,089 m). This report summarizes all major activities of the SSSDP, from project inception in the fall of 1984 through brine-pond cleanup and site restoration, ending in February 1989. This report presents a balanced summary of drilling, coring, logging, and flow-test operations, and a brief summary of technical and scientific results. Frequent reference is made to original records, data, and publication of results. The report also reviews the proposed versus the final well design, and operational summaries, such as the bit record, the casing and cementing program, and the coring program. Summaries are and the results of three flow tests. Several teamed during the project.

  13. Scheduling projects with multiskill learning effect.

    Science.gov (United States)

    Zha, Hong; Zhang, Lianying

    2014-01-01

    We investigate the project scheduling problem with multiskill learning effect. A new model is proposed to deal with the problem, where both autonomous and induced learning are considered. In order to obtain the optimal solution, a genetic algorithm with specific encoding and decoding schemes is introduced. A numerical example is used to illustrate the proposed model. The computational results show that the learning effect cannot be neglected in project scheduling. By means of determining the level of induced learning, the project manager can balance the project makespan with total cost.

  14. Technology Uncertainty and Project Managers' Information Sharing - A comparative case study of two new product development projects

    DEFF Research Database (Denmark)

    Jepsen, Lisbeth Brøde; Dietrich, Perttu

    2014-01-01

    uncertainty during various phases of new product development (NPD) projects. In this study, we compare two longitudinal NPD sub-projects that differ in uncertainty within the same large NPD project, in which the data source is the complete email exchange between a project manager and various actors...... (consisting of 3979 emails). The results show high levels of information sharing with the customer in both the early and late phases of high uncertainty. Interestingly, in the low uncertainty project, information sharing with the production department and the supplier is higher during the late phase...... of the NPD project. Unexpectedly, in both sub-projects, the project manager shares information with a wider range of both intra- and inter-organization actors in the early phases of the projects than in the late phases....

  15. The HCV Synthesis Project: Scope, methodology, and preliminary results

    Directory of Open Access Journals (Sweden)

    Scheinmann Roberta

    2008-09-01

    Full Text Available Abstract Background The hepatitis C virus (HCV is hyper-endemic in injecting drug users. There is also excess HCV among non-injection drug users who smoke, snort, or sniff heroin, cocaine, crack, or methamphetamine. Methods To summarize the research literature on HCV in drug users and identify gaps in knowledge, we conducted a synthesis of the relevant research carried out between 1989 and 2006. Using rigorous search methods, we identified and extracted data from published and unpublished reports of HCV among drug users. We designed a quality assurance system to ensure accuracy and consistency in all phases of the project. We also created a set of items to assess study design quality in each of the reports we included. Results We identified 629 reports containing HCV prevalence rates, incidence rates and/or genotype distribution among injecting or non-injecting drug user populations published between January 1989 and December 2006. The majority of reports were from Western Europe (41%, North America (26%, Asia (11% and Australia/New Zealand (10%. We also identified reports from Eastern Europe, South America, the Middle East, and the Caribbean. The number of publications reporting HCV rates in drug users increased dramatically between 1989 and 2006 to 27–52 reports per year after 1998. Conclusion The data collection and quality assurance phases of the HCV Synthesis Project have been completed. Recommendations for future research on HCV in drug users have come out of our data collection phase. Future research reports can enhance their contributions to our understanding of HCV etiology by clearly defining their drug user participants with respect to type of drug and route of administration. Further, the use of standard reporting methods for risk factors would enable data to be combined across a larger set of studies; this is especially important for HCV seroconversion studies which suffer from small sample sizes and low power to examine risk

  16. Analysis of core damage frequency from internal events: Expert judgment elicitation. Part 1: Expert panel results. Part 2: Project staff results

    Energy Technology Data Exchange (ETDEWEB)

    Wheeler, T A; Cramond, W R [Sandia National Laboratories, Albuquerque, NM (United States); Hora, S C [University of Hawii at Hilo (United States); Unwin, S D [Brookhaven National Laboratory (United States)

    1989-04-01

    Quantitative modeling techniques have limitations as to the resolution of important issues in probabilistic risk assessment (PRA). Not all issues can be resolved via the existing set of methods such as fault trees, event trees, statistical analyses, data collection, and computer simulation. Therefore, an expert judgment process was developed to address issues perceived as important to risk in the NUREG-1150 analysis but which could not be resolved with existing techniques. This process was applied to several issues that could significantly affect the internal event core damage frequencies of the PRAs performed on six light water reactors. Detailed descriptions of these issues and the results of the expert judgment elicitation are reported here, as well as an explanation of the methodology used and the procedure followed in performing the overall elicitation task. The process is time-consuming and expensive. However, the results are very useful, and represent an improvement over the draft NUREG-1150 analysis in the areas of expert selection, elicitation training, issue selection and presentation, elicitation of judgment and aggregation of results. The results are presented in two parts. Part documents the expert panel elicitations, where the most important issues were presented to a panel of experts convened from throughout the nuclear power risk assessment community. Part 2 documents the process by which the project staff performed expert judgment on other important issues, using the project staff as panel members. (author)

  17. Utilization of paleoclimate results to validate projections of a future greenhouse warming

    International Nuclear Information System (INIS)

    Crowley, T.J.

    1990-01-01

    Paleoclimate data provide a rich source of information for testing projections of future greenhouse trends. This paper summarizes the present state-of-the-art as to assessments of two important climate problems. (1) Validation of climate models - The same climate models that have been used to make greenhouse forecasts have also been used for paleoclimate simulations. Comparisons of model results and observations indicate some impressive successes but also some cases where there are significant divergences between models and observations. However, special conditions associated with the impressive successes could lead to a false confidence in the models; disagreements are a topic of greater concern. It remains to be determined whether the disagreements are due to model limitations or uncertainties in geologic data. (2) Role of CO 2 as a significant climate feedback: Paleoclimate studies indicate that the climate system is generally more sensitive than our ability to model it. Addition or subtraction of CO 2 leads to a closer agreement between models and observations. In this respect paleoclimate results in general support the conclusion that CO 2 is an important climate feedback, with the magnitude of the feedback approximately comparable to the sensitivity of present climate models. If the CO 2 projections are correct, comparison of the future warming with past warm periods indicate that there may be no geologic analogs for a future warming; the future greenhouse climate may represent a unique climate realization in earth history

  18. Globalization And Knowledge Management In Projects

    Directory of Open Access Journals (Sweden)

    Bubel Dagmara

    2015-06-01

    Full Text Available Knowledge management is a field of management dealing with the use of knowledge, methods, and tools to effectively coordinate complex and unique projects. In accordance with this definition, project knowledge can be treated as a useful resource of information that allows projects to be implemented in compliance with its objectives: time, costs, and quality of results. Knowledge in the activity of an organization, including in the implementation of projects, has for many years been an area of interest to researchers, who confirmed its key importance for building permanent competitive advantages of companies and enterprises. In project management, this issue takes on a new character, as it is transferred to the field of dynamic, time restricted, temporary, and team-implemented projects. The aim of this paper is to present the results of a survey regarding the use of practices of knowledge management in projects in international organizations and to show that the concept of knowledge management in projects is a tool conducive to spreading the process of globalization.

  19. Results of single borehole hydraulic tests in the Mizunami Underground Research Laboratory project. FY 2012 - FY 2015

    International Nuclear Information System (INIS)

    Onoe, Hironori; Takeuchi, Ryuji

    2016-11-01

    This report summarize the results of the single borehole hydraulic tests of 151 sections carried out at the -300 m Stage and the -500 m Stage of the Mizunami Underground Research Laboratory from FY 2012 to FY 2015. The details of each test (test interval depth, geology, etc.) as well as the interpreted hydraulic parameters and analytical methods used are presented in this report. Furthermore, the previous results of the single borehole hydraulic tests carried out in the Regional Hydrogeological Study Project and the Mizunami Underground Research Laboratory Project before FY 2012 are also summarized in this report. (author)

  20. Economic and social sustainability performance of jatropha projects: results from field surveys in Mozambique, Tanzania and Mali

    NARCIS (Netherlands)

    Romijn, H.A.; Heijnen, S.; Rom Colthoff, J.; Jong, de B.; Eijck, van J.A.J.

    2014-01-01

    This paper presents results from comprehensive field surveys of jatropha projects in Mozambique, Tanzania and Mali in 2012. The article singles out the salient economic and social impact results and derives lessons. The results clearly demonstrate the weak business case for jatropha biofuel

  1. Economic and Social Sustainability Performance of Jatropha Projects: Results from Field Surveys in Mozambique, Tanzania and Mali

    NARCIS (Netherlands)

    Romijn, Henny; Heijnen, Sanne; Rom Colthoff, Jouke; de Jong, Boris; van Eijck, Janske

    2014-01-01

    This paper presents results from comprehensive field surveys of jatropha projects in Mozambique, Tanzania and Mali in 2012. The article singles out the salient economic and social impact results and derives lessons. The results clearly demonstrate the weak business case for jatropha biofuel

  2. OECD-IAEA Paks Fuel Project. Detailed Description of the Results of Calculations

    International Nuclear Information System (INIS)

    2010-05-01

    On 10 April 2003 severe damage of fuel assemblies took place during an incident at Unit 2 of Paks Nuclear Power Plant in Hungary. The assemblies were being cleaned in a special tank below the water level of the spent fuel storage pool in order to remove crud buildup. That afternoon, the chemical cleaning of assemblies was completed and the fuel rods were being cooled by circulation of storage pool water. The first sign of fuel failure was the detection of some fission gases released from the cleaning tank during that evening. The cleaning tank cover locks were released after midnight and this operation was followed by a sudden increase in activity concentrations. The visual inspection revealed that all 30 fuel assemblies were severely damaged. The first evaluation of the event showed that the severe fuel damage happened due to inadequate coolant circulation within the cleaning tank. The damaged fuel assemblies will be removed from the cleaning tank in 2005 and will be stored in special canisters in the spent fuel storage pool of the Paks NPP. Following several discussions between expert from different countries and international organisations the OECD-IAEA Paks Fuel Project was proposed. The project is envisaged in two phases. - Phase 1 is to cover organization of visual inspection of material, preparation of database, performance of analyses and preparatory work for fuel examination. - Phase 2 is to cover the fuel transport and the hot cell examination

  3. Comprehensive assessment of the status scientific and technical projects using Technology Project Readiness Level

    Directory of Open Access Journals (Sweden)

    A. N. Petrov

    2016-01-01

    Full Text Available The balanced methodology for assessing the Technology Project Readiness Level for commercialization (TPRL is proposed. TPRL allows to determine the dynamics and balance of development projects that use the standardized approaches used in assessing the readiness of the technology. Validation of the methodology undertaken for the projects of Federal target programs “Research and development on priority directions of development of scientific-technological complex of Russia for 2007–2013” and “Research and development on priority directions of development of scientific-technological complex of Russia for 2014–2020”. The obtained results showed the possibility of application of the methodology for the evaluation of projects, improving efficiency of expert activity in the evaluation of projects, monitoring the status of individual project and group of projects (portfolio. The application of the methodology allowed us to improve the management of individual project and portfolio of projects.Methodology TPRL will allow the implementers, industry partners, investors, and innovative industrial companies to improve the efficiency of its activities.

  4. Key Issues in Global Technological Innovation Projects

    Directory of Open Access Journals (Sweden)

    Roberto Sbragia

    2012-04-01

    Full Text Available This article aimed to identify those issues that were present in global technological innovation projects carried out by Brazilian multinational companies and which performance criterions these undertakings met. We investigated 36 global technological innovation projects from Brazilian multinational enterprises through a web-survey. Findings show that these companies went beyond the traditional iron triangle to evaluate their technological efforts and considered additional performance dimensions such as customer satisfaction, business results, and preparation for the future. Results also show high degree of presence for issues emerging from the industry, moderate degree of presence for issues emerging from both the project and R&D activities, and low degree of presence for issues emerging from the headquarters, the subsidiaries, and the external environment. Further research is needed to find out if and how these issues influenced the performance of the global technological innovation projects studied.DOI:10.5585/gep.v3i1.72

  5. LIFE+ TRUST project: tool to assist the implementation of the Framework Directive 2000/60/CE, methodology and results

    Directory of Open Access Journals (Sweden)

    Vincenzo Marsala

    2014-09-01

    Full Text Available The TRUST project is funded by the European Commission’s by the Life+ Programme. The aim of the TRUST project is the identification of the adaption and mitigation measures to counteract the impacts of climate change on the groundwater of the Upper Plain in the Veneto and Friuli region in North-Eastern Italy. The TRUST project aims at implementing a water balance modelling tool to support institutions in formulating sustainable water management planning policies and best practices. This paper reviews the development and application of the tools for the groundwater balance model that simulate the groundwater deficit. Projections on the water deficit as a function of Climate Change have used future precipitation and evapotranspiration patterns derived from climate simulations (SRES-IPCC scenarios A1B and A2 of the Mediterranean region for the 20th and 21st centuries. Model outputs showed that a significant part of future water deficit might be recovered with Managed Aquifer Recharge that will permit the groundwater management preventing the climate change effect.

  6. Multi-scale model of the ionosphere from the combination of modern space-geodetic satellite techniques - project status and first results

    Science.gov (United States)

    Schmidt, M.; Hugentobler, U.; Jakowski, N.; Dettmering, D.; Liang, W.; Limberger, M.; Wilken, V.; Gerzen, T.; Hoque, M.; Berdermann, J.

    2012-04-01

    Near real-time high resolution and high precision ionosphere models are needed for a large number of applications, e.g. in navigation, positioning, telecommunications or astronautics. Today these ionosphere models are mostly empirical, i.e., based purely on mathematical approaches. In the DFG project 'Multi-scale model of the ionosphere from the combination of modern space-geodetic satellite techniques (MuSIK)' the complex phenomena within the ionosphere are described vertically by combining the Chapman electron density profile with a plasmasphere layer. In order to consider the horizontal and temporal behaviour the fundamental target parameters of this physics-motivated approach are modelled by series expansions in terms of tensor products of localizing B-spline functions depending on longitude, latitude and time. For testing the procedure the model will be applied to an appropriate region in South America, which covers relevant ionospheric processes and phenomena such as the Equatorial Anomaly. The project connects the expertise of the three project partners, namely Deutsches Geodätisches Forschungsinstitut (DGFI) Munich, the Institute of Astronomical and Physical Geodesy (IAPG) of the Technical University Munich (TUM) and the German Aerospace Center (DLR), Neustrelitz. In this presentation we focus on the current status of the project. In the first year of the project we studied the behaviour of the ionosphere in the test region, we setup appropriate test periods covering high and low solar activity as well as winter and summer and started the data collection, analysis, pre-processing and archiving. We developed partly the mathematical-physical modelling approach and performed first computations based on simulated input data. Here we present information on the data coverage for the area and the time periods of our investigations and we outline challenges of the multi-dimensional mathematical-physical modelling approach. We show first results, discuss problems

  7. Tuberculosis in cattle: the results of the four-area project

    Directory of Open Access Journals (Sweden)

    Griffin John M

    2005-11-01

    Full Text Available The four-area project was undertaken to further assess the impact of badger removal on the control of tuberculosis in cattle herds in Ireland. It was conducted between 1997 and 2002 in matched removal and reference areas in four counties, namely Cork, Donegal, Kilkenny and Monaghan, representing a wide range of Irish farming environments. In the removal areas, a proactive programme of badger removal was conducted, on two or three occasions each year, whereas in the reference areas, badger removal was entirely reactive following severe outbreaks of tuberculosis amongst cattle. A detailed statistical analysis of this study has already been presented by Griffin et al. 13; this paper presents further, mainly descriptive, findings from the study. In total, 2,360 badgers were captured in the removal areas of which 450 (19.5% were considered positive for tuberculosis and 258 badgers were captured in the reference areas, with 57 (26.1% positive for tuberculosis. The annual incidence of confirmed herd restrictions was lower in the removal area compared to the reference area in every year of the study period in each of the four counties. These empirical findings were consistent with the hazard ratios found by Griffin et al. 13. Further, the effect of proactive badger removal on cattle tuberculosis in the four-area project and in the earlier east-Offaly project, as measured using the number of reactors per 1,000 cattle tested, were very similar, providing compelling evidence of the role of badgers in the epidemiology of tuberculosis in Irish cattle herds. The validity of the four-area project was discussed in detail. Efforts to minimise badger-to-cattle transmission in Ireland must be undertaken in association with the current comprehensive control programme, which has effectively minimised opportunities for cattle-to-cattle transmission.

  8. HUBUNGAN KOMPETENSI PROJECT MANAGER TERHADAP KEBERHASILAN PROYEK KONSTRUKSI GEDUNG

    Directory of Open Access Journals (Sweden)

    Ida Ayu Ari Brahmantariguna

    2016-07-01

    Full Text Available Abstract :One of the factor that influences the achievement of a project success is the role of a project manager. A reliable project manager, who knows his duties as a project leader and has the necessary competency requirements is needed to achieve the success of the project. The competence of a project manager can be measured by three aspects: knowledge, skill and attitude.This research  aims to analyze the relationship between project manager competencies (that measured by three independent variables, i.e. Knowledge, skills and attitude and the success of the building construction project. Data was collected through a questionnaire survey. The sample/ respondents were the expertise in the field of building construction services those acts as a project manager. Data was analyzed  in three stages:first, factor analysis to reduce the variables into several groups of factors, that called as independent variables; second, correlation test with Pearson Correlation method to determine the correlation between independent variables  and dependent variable; lastly, perform multivariate regression analysis The results of factor analysis showed that the variables are formed into eleven groups, and the result of Pearson Correlation test showed only six groups correlated to project success, those are: Communication and Scope Management, Human Resource Management, which is part of knowledge; Leadership and Project Management, Professionalism and Issues Management as part of skill; and attitude concerning Responsibility, Vision and Priorities. The sixth group of these factors will be the independent variables in multivariate regression analysis. Based on multiple correlation test results, six independent variables simultaneously have a significant influence to the project success, proved by the result of probability value is 0,032.

  9. Comparison of the response of various TLDs to cosmic radiation and ion beams: Current results of the HAMLET project

    International Nuclear Information System (INIS)

    Bilski, P.; Berger, T.; Hajek, M.; Reitz, G.

    2011-01-01

    HAMLET is an European Commission research project aiming at optimal scientific exploitation of the data produced within the space experiment MATROSHKA. During phase 1 of this experiment a human phantom equipped with several thousands of radiation detectors (mainly TLDs) was exposed outside the International Space Station for 1.5 years. Besides the measurements realized in Earth orbit, the HAMLET project includes also a ground-based program of intercomparison of detector response to high-energy ion beams. Within the paper, the relative response of main glow-curve peaks of various TLDs (mostly based on LiF) used in frame of the MATROSHKA experiment by three laboratories (DLR Cologne, ATI Vienna and IFJ Krakow) for radiation in space and several ion beams, has been compared. For LiF:Mg,Ti detectors a very good agreement between results obtained by the three laboratories was observed, both for space and accelerator-based exposures. This should be considered a remarkable result, taking into account that the studied TLDs originated from six different batches, manufactured by two producers exploiting different production techniques and were processed by three laboratories, using significantly different protocols (annealing, readout, calibration, glow-curve analysis). Another type of TL detectors, LiF:Mg,Cu,P, was found to show response to cosmic radiation lower than that of LiF:Mg,Ti by 5%–18%.

  10. Knowledge management in design teams using a project website

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for

  11. Project management practice and its effects on project success in Malaysian construction industry

    Science.gov (United States)

    Haron, N. A.; Devi, P.; Hassim, S.; Alias, A. H.; Tahir, M. M.; Harun, A. N.

    2017-12-01

    The rapid economic development has increased the demand for construction of infrastructure and facilities globally. Sustainable development and globalization are the new ‘Zeitgeist’ of the 21st century. In order to implement these projects successfully and to meet the functional aim of the projects within their lifetime, an efficient project management practice is needed. The aim of this study is to identify the critical success factors (CSFs) and the extent of use of project management practice which affects project success, especially during the implementation stage. Data were obtained from self-administered questionnaires with 232 respondents. A mixed method of data collection was adopted using semi-structured interview and questionnaire approach. The result of the analysis of data obtained showed that new and emerging criteria such as customer satisfaction, competency of the project team, and performance of subcontractors/suppliers are becoming measures of success in addition to the classic iron triangle’s view of time, cost and quality. An insight on the extent of use of different project management practice in the industry was also achieved from the study.

  12. Fuel integrity project: analysis of light water reactor fuel rods test results

    International Nuclear Information System (INIS)

    Dallongeville, M.; Werle, J.; McCreesh, G.

    2004-01-01

    BNFL Nuclear Sciences and Technology Services and COGEMA LOGISTICS started in the year 2000 a joint project known as FIP (Fuel Integrity Project) with the aim of developing realistic methods by which the response of LWR fuel under impact accident conditions could be evaluated. To this end BNFL organised tests on both unirradiated and irradiated fuel pin samples and COGEMA LOGISTICS took responsibility for evaluating the test results. Interpretation of test results included simple mechanical analysis as well as simulation by Finite Element Analysis. The first tests that were available for analysis were an irradiated 3 point bending commissioning trial and a lateral irradiated hull compression test, both simulating the loading during a 9 m lateral regulatory drop. The bending test span corresponded roughly to a fuel pin intergrid distance. The outcome of the test was a failure starting at about 35 mm lateral deflection and a few percent of total deformation. Calculations were carried out using the ANSYS code employing a shell and brick model. The hull lateral compaction test corresponds to a conservative compression by neighbouring pins at the upper end of the fuel pin. In this pin region there are no pellets inside. The cladding broke initially into two and later into four parts, all of which were rather similar. Initial calculations were carried out with LS-DYNA3D models. The models used were optimised in meshing, boundary conditions and material properties. The calculation results compared rather well with the test data, in particular for the detailed ANSYS approach of the 3 point bending test, and allowed good estimations of stresses and deformations under mechanical loading as well as the derivation of material rupture criteria. All this contributed to the development of realistic numerical analysis methods for the evaluation of LWR fuel rod behaviour under both normal and accident transport conditions. This paper describes the results of the 3 point bending

  13. Fuel integrity project: analysis of light water reactor fuel rods test results

    Energy Technology Data Exchange (ETDEWEB)

    Dallongeville, M.; Werle, J. [COGEMA Logistics (AREVA Group) (France); McCreesh, G. [BNFL Nuclear Sciences and Technology Services (United Kingdom)

    2004-07-01

    BNFL Nuclear Sciences and Technology Services and COGEMA LOGISTICS started in the year 2000 a joint project known as FIP (Fuel Integrity Project) with the aim of developing realistic methods by which the response of LWR fuel under impact accident conditions could be evaluated. To this end BNFL organised tests on both unirradiated and irradiated fuel pin samples and COGEMA LOGISTICS took responsibility for evaluating the test results. Interpretation of test results included simple mechanical analysis as well as simulation by Finite Element Analysis. The first tests that were available for analysis were an irradiated 3 point bending commissioning trial and a lateral irradiated hull compression test, both simulating the loading during a 9 m lateral regulatory drop. The bending test span corresponded roughly to a fuel pin intergrid distance. The outcome of the test was a failure starting at about 35 mm lateral deflection and a few percent of total deformation. Calculations were carried out using the ANSYS code employing a shell and brick model. The hull lateral compaction test corresponds to a conservative compression by neighbouring pins at the upper end of the fuel pin. In this pin region there are no pellets inside. The cladding broke initially into two and later into four parts, all of which were rather similar. Initial calculations were carried out with LS-DYNA3D models. The models used were optimised in meshing, boundary conditions and material properties. The calculation results compared rather well with the test data, in particular for the detailed ANSYS approach of the 3 point bending test, and allowed good estimations of stresses and deformations under mechanical loading as well as the derivation of material rupture criteria. All this contributed to the development of realistic numerical analysis methods for the evaluation of LWR fuel rod behaviour under both normal and accident transport conditions. This paper describes the results of the 3 point bending

  14. Experimental Results of A1.2 Test for OECD-ATLAS Project

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Kyoung-Ho; Bae, Byoung-Uhn; Park, Yu-Sun; Kim, Jong-Rok; Choi, Nam-Hyun; Choi, Ki-Yong [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    In order to meet the international interests in the multiple high-risk design extension conditions (DECs) raised after the Fukushima accident, KAERI (Korea Atomic Energy Research Institute) is operating an OECD/NEA project (hereafter, OECD-ATLAS project) by utilizing a thermal-hydraulic integral effect test facility, ATLAS (Advanced Thermal-hydraulic Test Loop for Accident Simulation). As for a prolonged SBO transient of the OECD-ATLAS project, two tests, named A1.1 and A1.2, were determined to be performed. In particular, passive safety systems are considered as the most promising alternatives to reinforce the safety and reliability of an ultimate heat removal system without any operator actions in the SBO transients. As one of the new safety improvement concepts to mitigate an SBO accident efficiently, a cooling and operational performance of the passive auxiliary feedwater system (PAFS) is investigated in the framework of the OECD-ATLAS project to produce clearer knowledge of the actual phenomena and to provide the best guidelines for accident management. As the second test of the OECD-ATLAS project, the A1.2 test was conducted to simulate a prolonged SBO with asymmetric secondary cooling through the supply of passive auxiliary feedwater only to SG-2. When the collapsed water level of steam generator reached a wide range of 25%, PAFS was actuated. PAFS played a key role in cooling down the primary system by the heat transfer and the natural circulation. With the actuation of PAFS, the fluid temperatures at the core inlet and outlet started to decrease without any excursion of the maximum heater surface temperature in the core. This integral effect test data of A1.2 test can be used to evaluate the prediction capability of existing safety analysis codes and identify any code deficiency for an SBO simulation with an operation of a passive system such as PAFS.

  15. Market trends in the U.S. ESCO industry: Results from the NAESCO database project

    Energy Technology Data Exchange (ETDEWEB)

    Goldman, Charles A.; Osborn, Julie G.; Hopper, Nicole C.; Singer, Terry E.

    2002-05-01

    The U.S. Energy Services Company (ESCO) industry is often cited as the most successful model for the private sector delivery of energy-efficiency services. This study documents actual performance of the ESCO industry in order to provide policymakers and investors with objective information and customers with a resource for benchmarking proposed projects relative to industry performance. We have assembled a database of nearly 1500 case studies of energy-efficiency projects-the most comprehensive data set of the U.S. ESCO industry available. These projects include $2.55B of work completed by 51 ESCOs and span much of the history of this industry. We estimate that the ESCO industry completed $1.8-2.1B of projects in 2000. The industry has grown rapidly over the last decade with revenues increasing at a 24% annualized rate. We summarize and compare project characteristics and costs and analyze energy savings, including the relationship between predicted and actual savings. ESCOs typically invested about $2.30/ft{sup 2} per project in various energy efficiency improvements, although there is large variation in project costs within and across market segments. We find that lighting-only projects report median electricity savings of 47% of targeted equipment consumption; the median for lighting-&-non-lighting projects is 23% of the total electric bill baseline. We examine project economics, including project net benefits, benefit/cost ratio and simple payback time. Median simple payback time is seven years for institutional sector projects and three years in the private sector. We estimate direct economic benefits of $1.62 billion for the 1080 projects in our database with both cost and savings data. The median benefit/cost ratio is 2.1 for 309 private sector projects and 1.6 for 771 institutional sector projects. We discuss the role of policies and programs adopted by state/federal legislatures and agencies that have played an important role in stimulating ESCO activity

  16. Graduate Student Project: Employer Operations Management Analysis

    Science.gov (United States)

    Fish, Lynn A.

    2008-01-01

    Part-time graduate students at an Association to Advance Collegiate Schools of Business-accredited college complete a unique project by applying operations management concepts to their current employer. More than 92% of 368 graduates indicated that this experiential project was a positive learning experience, and results show a positive impact on…

  17. An ABC analysis for power generation project

    Directory of Open Access Journals (Sweden)

    Batool Hasani

    2013-07-01

    Full Text Available One of the primary concerns on performance measurement is to know how much a particular project cost. However, using traditional method on project-based products often leads to inappropriate results. In this paper, we re-examine this issue by comparing the cost of a power station construction project using ABC versus traditional method. The results of survey show that ABC method is capable of providing better estimates for overhead costs compared with traditional method. In other words, ABC method helps reduce some of the unnecessary overhead cost items and increase on some other cost components. This helps increase the relative efficiency of the system by reducing total cost of project.

  18. Scrum Project Management

    CERN Document Server

    Pries, Kim H

    2010-01-01

    Scrum, which was originally invented solely for software development, can now be applied to all types of projects. This book shows project managers how to implement Scrum by explaining the artifacts, rituals, and roles used. The text provides Scrum planning methods to control project scope and schedule as well as Scrum tracking methods to focus teams on improving throughput and streamlining communications. The authors show how to combine traditional project methods with Scrum and how to adapt the familiar work breakdown structure to create Scrum backlogs and sprints. They also demonstrate how

  19. Current status of a decommissioning project in the Enrichment Engineering Facility. Results in the second-half of the fiscal year of 2014

    International Nuclear Information System (INIS)

    Matsumoto, Takashi; Hayashibara, Kenichi; Ishimori, Yuu; Mita, Yutaka; Kakiya, Hideyoshi; Takahashi, Nobuo

    2016-11-01

    The Enrichment Engineering Facility of the Ningyo-toge Environmental Engineering Center was constructed in order to establish the technological basis of plant engineering for uranium enrichment in Japan. Uranium enrichment tests, using natural and reprocessed uranium, were carried out from 1979 to 1989 with two operation units in the facility. According to the decommissioning plan of the facility, UF 6 handling equipment and supplemental equipment in these plants are intended to be dismantled by 2019 in order to make vacant spaces for future projects use, for example, inventory investigation, precipitation treatment, etc. This report shows the current state of the decommissioning project in the second-half of the fiscal year of 2014, with indicating its schedule, procedure, situation, results, and so on. The dismantled materials generated amounted to 69 mesh containers and 191 drums, and the secondary waste generated amounted to 1,585.7 kg during the half year. In the fiscal year of 2014, the project was carried out according to the plan. The dismantled materials generated amounted to 153,938.1 kg as the whole of this period, and 36,343 kg from among them was treated as non-radioactive materials. (author)

  20. Types of treatment collaboration between conventional and alternative practitioners – results from a research project at a Danish MS hospital

    Directory of Open Access Journals (Sweden)

    Lasse Skovgaard

    2010-12-01

    Full Text Available Introduction: More than 50% of the People with Multiple Sclerosis (PwMS in Denmark use alternative treatment. Most of them combine alternative and conventional treatment, but PwMS often find that there is no dialogue, coordination or synergy between the parallel courses of treatment offered. For this reason the Danish Multiple Sclerosis Society conducted a research project to develop and examine different models for collaboration between conventional and alternative treatment providers. Materials and methods: Empirical material consist of individual interviews with practitioners, a group interview with practitioners, a group interview with professional staff at the Danish MS hospital that provided the organisational framework for the project, interviews with patients as well as written responses from participating treatment providers in connection with practitioner-researcher seminars held. Results: Collaboration between researchers and the treatment team resulted in the development examination of several models which describe the strengths and weaknesses of various types of collaboration. The models also show that the various types of collaboration place different requirements on the degree of 1 mutual acknowledgement and understanding among practitioners, 2 flexibility and resources in the organizational framework, and 3 patients' activities and own efforts, respectively.    Perspectives: The relationship between integration and pluralism can contribute to a fruitful discussion in regards to the value of treatment collaboration. In addition to the many positive perspectives the characterise integration of different treatment modalities the project points to the importance of not overlooking the opportunities, values and potential inherent in a pluralistic ideal in the form of patients' own active efforts and the dynamism that can arise when the patient becomes a co-informant, co-coordinator and/or co-integrator.

  1. Single-photon sources for quantum technologies - Results of the joint research project SIQUTE

    DEFF Research Database (Denmark)

    Kück, S.; López, M.; Rodiek, B.

    2017-01-01

    In this presentation, the results of the joint research project “Single-Photon Sources for Quantum Technologies” (SIQUTE) [1] will be presented. The focus will be on the development of absolutely characterized single-photon sources, on the realization of an efficient waveguide-based single-photon......-photon source at the telecom wavelengths of 1.3 µm and 1.55 µm, on the implementation of the quantum-enhanced resolution in confocal fluorescence microscopy and on the development of a detector for very low photon fluxes...

  2. Projecting twenty-first century regional sea-level changes

    NARCIS (Netherlands)

    Slangen, A.B.A.; Carson, M.; Katsman, C.A.; van de Wal, R.S.W.; Köhl, A.; Vermeersen, L.L.A.; Stammer, D.

    2014-01-01

    We present regional sea-level projections and associated uncertainty estimates for the end of the 21 (st) century. We show regional projections of sea-level change resulting from changing ocean circulation, increased heat uptake and atmospheric pressure in CMIP5 climate models. These are combined

  3. Results of the mid-term assessment of the 'High Performance Light Water Reactor Phase 2' project

    International Nuclear Information System (INIS)

    Starflinger, J.; Schulenberg, T.; Marsault, P.

    2009-01-01

    The High Performance Light Water Reactor (HPLWR) is a Light Water Reactor (LWR) operating at supercritical pressure (p>22.1 MPa). In Europe, investigations on the HPLWR have been integrated into a joint research project, called High Performance Light Water Reactor Phase 2 (HPLWR Phase 2), which is co-funded by the European Commission. Within the second year of the project, the design of the reactor core, the pressure vessel and its internals have been analysed in detail by means of advanced codes and methods. The mechanical design has been assessed and shows that stresses inside components and possible deformations keep within acceptable limits. The neutronics and the flow inside the core have been investigated. The addition of a water layer in the reflector helps to flatten the radial power profile. The moderator flow path must be changed because of possible reverse flow in the gaps between the assemblies (downward flow). First calculations of transients showed an acceptable behaviour of the cladding temperatures. Material oxidation experiments were successfully performed. The auxiliary loop of the Supercritical Water Loop has been constructed. Heat transfer has been investigated numerically analysing heat transfer deterioration (HTD) and flow around fuel pins with wire wrap spacers. (author)

  4. Design, Results, Evolution and Status of the ATLAS Simulation at Point1 Project

    CERN Document Server

    AUTHOR|(SzGeCERN)377840; Fressard-Batraneanu, Silvia Maria; Ballestrero, Sergio; Contescu, Alexandru Cristian; Fazio, Daniel; Di Girolamo, Alessandro; Lee, Christopher Jon; Pozo Astigarraga, Mikel Eukeni; Scannicchio, Diana; Sedov, Alexey; Twomey, Matthew Shaun; Wang, Fuquan; Zaytsev, Alexander

    2015-01-01

    Abstract. During the LHC Long Shutdown 1 period (LS1), that started in 2013, the Simulation at Point1 (Sim@P1) Project takes advantage, in an opportunistic way, of the TDAQ (Trigger and Data Acquisition) HLT (High Level Trigger) farm of the ATLAS experiment. This farm provides more than 1300 compute nodes, which are particularly suited for running event generation and Monte Carlo production jobs that are mostly CPU and not I/O bound. It is capable of running up to 2700 virtual machines (VMs) provided with 8 CPU cores each, for a total of up to 22000 parallel running jobs. This contribution gives a review of the design, the results, and the evolution of the Sim@P1 Project; operating a large scale OpenStack based virtualized platform deployed on top of the ATLAS TDAQ HLT farm computing resources. During LS1, Sim@P1 was one of the most productive ATLAS sites: it delivered more than 50 million CPU-hours and it generated more than 1.7 billion Monte Carlo events to various analysis communities. The design aspects a...

  5. Design, Results, Evolution and Status of the ATLAS simulation in Point1 project.

    CERN Document Server

    Ballestrero, Sergio; The ATLAS collaboration; Brasolin, Franco; Contescu, Alexandru Cristian; Fazio, Daniel; Di Girolamo, Alessandro; Lee, Christopher Jon; Pozo Astigarraga, Mikel Eukeni; Scannicchio, Diana; Sedov, Alexey; Twomey, Matthew Shaun; Wang, Fuquan; Zaytsev, Alexander

    2015-01-01

    During the LHC long shutdown period (LS1), that started in 2013, the simulation in Point1 (Sim@P1) project takes advantage in an opportunistic way of the trigger and data acquisition (TDAQ) farm of the ATLAS experiment. The farm provides more than 1500 computer nodes, and they are particularly suitable for running event generation and Monte Carlo production jobs that are mostly CPU and not I/O bound. It is capable of running up to 2500 virtual machines (VM) provided with 8 CPU cores each, for a total of up to 20000 parallel running jobs. This contribution gives a thorough review of the design, the results and the evolution of the Sim@P1 project operating a large scale Openstack based virtualized platform deployed on top of the ATLAS TDAQ farm computing resources. During LS1, Sim@P1 was one of the most productive GRID sites: it delivered more than 50 million CPU-hours and it generated more than 1.7 billion Monte Carlo events to various analysis communities within the ATLAS collaboration. The particular design ...

  6. Evaluation model of project complexity for large-scale construction projects in Iran - A Fuzzy ANP approach

    Directory of Open Access Journals (Sweden)

    Aliyeh Kazemi

    2016-09-01

    Full Text Available Construction projects have always been complex. By growing trend of this complexity, implementations of large-scale constructions become harder. Hence, evaluating and understanding these complexities are critical. Correct evaluation of a project complication can provide executives and managers with good source to use. Fuzzy analytic network process (ANP is a logical and systematic approach toward defining, evaluation, and grading. This method allows for analyzing complex systems, and determining complexity of them. In this study, by taking advantage of fuzzy ANP, effective indexes for development of complications in large-scale construction projects in Iran have been determined and prioritized. The results show socio-political, project system interdependencies, and technological complexity indexes ranked top to three. Furthermore, in comparison of three main huge projects: commercial-administrative, hospital, and skyscrapers, the hospital project had been evaluated as the most complicated. This model is beneficial for professionals in managing large-scale projects.

  7. The Difficulty in Following Project Schedule as a Key Project Management Challenge: Family Firm Perspective

    Directory of Open Access Journals (Sweden)

    Joanna SADKOWSKA

    2016-12-01

    Full Text Available The problem of how to manage projects successfully has been gaining growing interest for the last decades. The aforementioned is mainly caused by the fact that project management offers a wide range of methods and tools which, when properly used, can stimulate long-term growth of businesses. As a consequence it offers a particular development opportunity for family enterprises which, due to their specificity, have to overcome many difficulties. The primary objective of this paper is to examine whether family enterprises perceive, and to what extent, the factor of following project schedule as a difficulty in the area of project management. 154 Polish family firms representing different sectors were surveyed. The results of regression analysis show that family firms with global range of business activities, on the contrary to those with local or regional ones, do not find the factor of following project schedule as a difficulty. This results manly from the tools employed and the maturity level they have reached in project management. The findings support the current discussion on the specificity and uniqueness of family businesses in relationship to the knowledge area of project management. It also contributes to filling the gap on understanding the functioning of family firms in the emerging economies of Eastern Europe.

  8. Coupled behaviour of bentonite buffer results of PUSKURI project

    International Nuclear Information System (INIS)

    Olin, M.; Rasilainen, K.; Itaelae, A.

    2011-08-01

    In the report main results form a KYT2010 programme's project Coupled behaviour of bentonite buffer (PUSKURI) are presented. In THC modelling, Aku Itaelae made and published his Master of Science Thesis. Itaelae was able to successfully model the LOT-experiment. Additionally, he also listed problems and development proposals for THC-modelling of bentonite buffer. VTT and Numerola created in collaboration a model coupling saturation, diffusion and cation exchange; the model was implemented and tested in Numerrin, COMSOL and TOUGHREACT. Petri Jussila's PhD THM-model was implemented into COMSOL to facilitate further development. At GTK, the mineralogical characterisation of bentonite was planned. The previous THM model (Jussila's model) including only small deformations was successfully generalized to finite deformations in way at least formally preserving the original formalism. It appears that the theory allows also a possibility to include finite plastic deformations in the theory. In order to measure the relevant mechanical properties of compacted bentonite, two different experiments, namely hydrostatic compression experiment and one-dimensional compression experiment were designed. In the hydrostatic compression experiment, a cylindrical sample of compacted bentonite covered with liquid rubber coating is placed in the sample chamber equipped with a piston. The same device was also used in one-dimensional compression experiment. X-ray microtomographic techniques were used in order to study the basic mechanisms of water transport in bentonite. The preliminary results indicate that in the present experimental set-up, water transport is dominated by a dispersive mechanism such as diffusion of vapour in gas phase or diffusion of water in solid phase. (orig.)

  9. Second-Year Results from the Circumarctic Lakes Observation Network (CALON) Project

    Science.gov (United States)

    Hinkel, K. M.; Arp, C. D.; Beck, R. A.; Eisner, W. R.; Frey, K. E.; Gaglioti, B.; Grosse, G.; Jones, B. M.; Kim, C.; Lenters, J. D.; Liu, H.; Townsend-Small, A.

    2013-12-01

    temperatures in small shallow lakes and more southern latitudes. Most lakes are well-mixed and largely isothermal, with short periods of thermal stratification occurring in deeper lakes during calm, sunny periods. Over the ice-free season, the majority of the available energy from net radiation goes into evaporation, followed by sensible heat flux and warming of bottom sediments. Thermal bands of MODIS and Landsat imagery were fused using a spatio-temporal cokriging method to generate daily surface temperature estimates at Landsat spatial resolution. The close correspondence between satellite-derived and in situ measured near-surface lake temperature suggests that this approach yields viable results. Biogeochemical and inorganic geochemical constituents measured include dissolved greenhouse gas concentrations (CO2, CH4, and N2O), inorganic N, DON and DOC, alkalinity, chlorophyll-a, major ions, and CDOM. The greatest difference in the dissolved CH4:CO2 ratio in summer was longitudinal, with several lakes in western Alaskan Arctic exhibiting CH4 concentrations hundreds of times more supersaturated than air. Stable isotope analyses of CH4 (δ13C and δ2H) show that several of these lakes have natural gas methane sources. Methane concentrations under ice (April) were several thousand times higher than in open-water conditions (August). Data collected during this 4-year project are archived at A-CADIS.

  10. Why Different Drought Indexes Show Distinct Future Drought Risk Outcomes in the U.S. Great Plains?

    Science.gov (United States)

    Feng, S.; Hayes, M. J.; Trnka, M.

    2015-12-01

    Vigorous discussions and disagreements about the future changes in drought intensity in the US Great Plains have been taking place recently within the literature. These discussions have involved widely varying estimates based on drought indices and model-based projections of the future. To investigate and understand the causes for such a disparity between these previous estimates, we analyzed 10 commonly-used drought indexes using the output from 26 state-of-the-art climate models. These drought indices were computed using potential evapotranspiration estimated by the physically-based Penman-Monteith method (PE_pm) and the empirically-based Thornthwaite method (PE_th). The results showed that the short-term drought indicators are similar to modeled surface soil moisture and show a small but consistent drying trend in the future. The long-term drought indicators and the total column soil moisture, however, are consistent in projecting more intense future drought. When normalized, the drought indices with PE_th all show unprecedented and possibly unrealistic future drying, while the drought indices with PE_pm show comparable dryness with the modeled soil moisture. Additionally, the drought indices with PE_pm are closely related to soil moisture during both the 20th and 21st Centuries. Overall, the drought indices with PE_pm, as well as the modeled total column soil moisture, suggest a widespread and very significant drying of the Great Plains region toward the end of the Century. Our results suggested that the sharp contracts about future drought risk in the Great Plains discussed in previous studies are caused by 1) comparing the projected changes in short-term droughts with that of the long-term droughts, and/or 2) computing the atmospheric evaporative demand using the empirically-based method (e.g., PE_th). Our analysis may be applied for drought projections in other regions across the globe.

  11. PROJECT - RESOURCE MANAGEMENT OF INNOVATIONS IN EDUCATION: ANTHROPOLOGICAL PROJECTION

    Directory of Open Access Journals (Sweden)

    Galina Aleksandrovna Ignat’eva

    2015-08-01

    Full Text Available The purpose of the research was to denote a way to solve the problem of education mana-gement ΄s insufficient efficiency considered from the point of view of education opportunities to influence on the formation of mechanisms for sustainable development of society as a whole and its educational component. The concept «project-resource management of innovation in education» regarded on the basis of the anthropological project-transforming paradigm. Conceptually-categorical context presented by conceptual cluster composed of coordinated concepts «project», «resource», «educational reality», «organizational-resource potential», «project commonality». In the theoretical part of the study on the basis of analysis of the normative and exploratory approaches to educational innovations organization and management it was established the search approach ΄s leading role in the methodological substantiation of project-resource management. The study have indicated that in the presence of variable models of innovation management in education, corresponding to various predictive models of continuing education post-industrial society, project-resource management is an universal mechanism for the transition from separate innovation΄s precedents to the an authentic reality of innovative education. In the technological part of the study the main concern was to submit the project-resource management by the management goal’s system, each of which includes the specific management actions, projected results and the organizational forms. The project-resource management ΄s professional – activity context of the study showed evolution of managerial positions: an effective performer – an effective leader – strategist, implemented during the transition from directly directive management to the project management and further to the project-resource management. Based on the findings identified the key factors of initiatively-problem projects

  12. Female Project Managers' Workplace Problems: a Survey

    Science.gov (United States)

    Duong, Thuong Thi; Skitmore, Martin

    This article examines the extent to which challenges in the workplace may cause female project managers to be in a significantly small minority. A survey of members of the Australian Institute of Project Management in Queensland is described. This compares the experiences and observations of both men and women on various issues related to technical and gender aspects in project management workplaces. The results show that although female project managers experience many problems, male project managers also experience most of the same problems. Likewise, there are also few differences between more and less experience, the level of management, and types of industries. The differences that do occur involve discrimination against women in general, differences in project management styles, and support from other project managers.

  13. Green technology foresight of products and materials - some reflections and results from an ongoing Danish project

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Pedersen, Thomas Thoning; Falch, Morten

    2005-01-01

    The article presents some methodological and theoretical reflections and some preliminary results from a Danish Green Technology Foresight project about environmental friendly products and materials, where the environmental potentials and risks from three technology areas are analysed: nano- bio...

  14. Regional demand and supply projections for outdoor recreation

    Science.gov (United States)

    Donald B. K. English; Carter J. Betz; J. Mark Young; John C. Bergstrom; H. Ken Cordell

    1993-01-01

    This paper develops regional recreation supply and demand projections, by combining coefficients from the national 1989 RPA Assessment models with regional regressor values. Regional recreation opportunity estimates also are developed, based on regional travel behavior. Results show important regional variations in projections of recreation opportunities, trip supply,...

  15. The public visits a nuclear waste site: Survey results from the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Hoffman, W.D.

    1987-01-01

    This paper discusses the results of the 1986 survey taken at the West Valley Demonstration Project Open House where a major nuclear waste cleanup is in progress. Over 1400 people were polled on what they think is most effective in educating the public on nuclear waste. A demographic analysis describes the population attending the event and their major interests in the project. Responses to attitudinal questions are examined to evaluate the importance of radioactive waste cleanup as an environmental issue and a fiscal responsibility. Additionally, nuclear power is evaluated on its public perception as an energy resource. The purpose of the study is to find out who visits a nuclear waste site and why, and to measure their attitudes on nuclear issues

  16. High-accuracy contouring using projection moiré

    Science.gov (United States)

    Sciammarella, Cesar A.; Lamberti, Luciano; Sciammarella, Federico M.

    2005-09-01

    Shadow and projection moiré are the oldest forms of moiré to be used in actual technical applications. In spite of this fact and the extensive number of papers that have been published on this topic, the use of shadow moiré as an accurate tool that can compete with alternative devices poses very many problems that go to the very essence of the mathematical models used to obtain contour information from fringe pattern data. In this paper some recent developments on the projection moiré method are presented. Comparisons between the results obtained with the projection method and the results obtained by mechanical devices that operate with contact probes are presented. These results show that the use of projection moiré makes it possible to achieve the same accuracy that current mechanical touch probe devices can provide.

  17. Sample preparation for the HAW project and experimental results from the HFR

    International Nuclear Information System (INIS)

    Garcia Celma, A.; Wees, H. van; Miralles, L.

    1990-09-01

    This report deals with the preparation and analysis of samples, during the period May 1989-November 1989, for the High-Active Waste (HAW) project, a large-scale in situ test being performed underground in the Asse salt mine, Remlingen FRG. The development of the technical procedures required, and the scientific results, which regard mostly characterization of Potasas del Llobregat sample, are reported. Prior to using the samples in both the H.A.W. and the H.F.R. experiments they have to be machined to fit their holders. Technical improvements for machining samples of salt are reported. (H.W.). 9 refs.; 68 figs.; 10 tabs

  18. ESCO market and industry trends: Updated results from the NAESCO database project

    Energy Technology Data Exchange (ETDEWEB)

    Osborn, Julie G.; Goldman, Charles A.; Hopper, Nicole C.

    2001-10-15

    Today's U.S. energy efficiency services industry is one of the most successful examples of private sector energy efficiency services in the world, yet little empirical information is available on the actual market activity of this industry. LBNL, together with the National Association of Energy Services Companies (NAESCO), has compiled the most comprehensive dataset of the energy efficiency services industry: nearly 1,500 case studies of energy efficiency projects. Our analysis of these projects helps shed light on some of the conventional wisdom regarding industry performance and evolution. We report key statistics about typical projects and industry trends that will aid state, federal, and international policymakers, and other investors interested in the development of a private sector energy efficiency services industry.

  19. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  20. A secure communication scheme using projective chaos synchronization

    International Nuclear Information System (INIS)

    Li Zhigang; Xu Daolin

    2004-01-01

    Most secure communication schemes using chaotic dynamics are based on identical synchronization. In this paper, we show the possibility of secure communication using projective synchronization (PS). The unpredictability of the scaling factor in projective synchronization can additionally enhance the security of communication. It is also showed that the scaling factor can be employed to improve the robustness against noise contamination. The feasibility of the communication scheme in high-dimensional chaotic systems, such as the hyperchaotic Roessler system, is demonstrated. Numerical results show the success in transmitting a sound signal through chaotic systems

  1. Types of treatment collaboration between conventional and alternative practitioners – results from a research project at a Danish MS hospital

    Directory of Open Access Journals (Sweden)

    Lasse Skovgaard

    2010-12-01

    Full Text Available Introduction: More than 50% of the People with Multiple Sclerosis (PwMS in Denmark use alternative treatment. Most of them combine alternative and conventional treatment, but PwMS often find that there is no dialogue, coordination or synergy between the parallel courses of treatment offered. For this reason the Danish Multiple Sclerosis Society conducted a research project to develop and examine different models for collaboration between conventional and alternative treatment providers. Materials and methods: Empirical material consist of individual interviews with practitioners, a group interview with practitioners, a group interview with professional staff at the Danish MS hospital that provided the organisational framework for the project, interviews with patients as well as written responses from participating treatment providers in connection with practitioner-researcher seminars held. Results: Collaboration between researchers and the treatment team resulted in the development examination of several models which describe the strengths and weaknesses of various types of collaboration. The models also show that the various types of collaboration place different requirements on the degree of 1 mutual acknowledgement and understanding among practitioners, 2 flexibility and resources in the organizational framework, and 3 patients' activities and own efforts, respectively.    Perspectives: The relationship between integration and pluralism can contribute to a fruitful discussion in regards to the value of treatment collaboration. In addition to the many positive perspectives the characterise integration of different treatment modalities the project points to the importance of not overlooking the opportunities, values and potential inherent in a pluralistic ideal in the form of patients' own active efforts and the dynamism that can arise when the patient becomes a co-informant, co-coordinator and/or co-integrator. 

  2. Experimental results on advanced inertial fusion schemes obtained within the HiPER project

    International Nuclear Information System (INIS)

    Batani, Dimitri; Santos, Jorge J.; Schurtz, Guy; Hulin, Sebastien; Ribeyre, Xavier; Nicolai, Philippe; Vauzour, Benjamin; Dorchies, Fabien; Gizzi, Leonida A.; Koester, Petra; Labate, Luca; Honrubia, Javier; Antonelli, Luca; Morace, Alessio; Volpe, Luca; Nazarov, Wiger; Pasley, John; Richetta, Maria; Lancaster, Kate; Spindloe, Christopher; Tolley, Martin; Neely, David; Kozlova, Michaela; Nejdl, Jaroslav; Rus, Bedrich; Wolowski, Jerzy; Badziak, Jan

    2012-01-01

    This paper presents the results of experiments conducted within the Work Package 10 (fusion experimental programme) of the HiPER project. The aim of these experiments was to study the physics relevant for advanced ignition schemes for inertial confinement fusion, i.e. the fast ignition and the shock ignition. Such schemes allow to achieve a higher fusion gain compared to the indirect drive approach adopted in the National Ignition Facility in United States, which is important for the future inertial fusion energy reactors and for realising the inertial fusion with smaller facilities. (authors)

  3. Results of single borehole hydraulic testing in the Mizunami Underground Research Laboratory project. Phase 2

    International Nuclear Information System (INIS)

    Daimaru, Shuji; Takeuchi, Ryuji; Onoe, Hironori; Saegusa, Hiromitsu

    2012-09-01

    This report summarize the results of the single borehole hydraulic tests of 79 sections conducted as part of the Construction phase (Phase 2) in the Mizunami Underground Research Laboratory (MIU) Project. The details of each test (test interval depth, geology, etc.) as well as the interpreted hydraulic parameters and analytical method used are presented in this report. (author)

  4. Quality of illegally and informally produced alcohol in Europe: Results from the AMPHORA project.

    Science.gov (United States)

    Lachenmeier, Dirk W; Leitz, Jenny; Schoeberl, Kerstin; Kuballa, Thomas; Straub, Irene; Rehm, Jürgen

    2011-01-01

    In the WHO region Europe, the average unrecorded adult per capita alcohol consumption was 2.67 L pure ethanol in 2005, which is 22% of the total consumption of 12.20 L. Despite concerns about potential health harms from the chemical composition of unrecorded alcohol, there are surprisingly few data on the problem in the European Region. This study reports the results from the Alcohol Measures for Public Health Research Alliance (AMPHORA) project, which assessed the quality of unrecorded alcohol in a Europe-wide study. Samples of unrecorded alcohol were collected in 16 European countries and chemically analyzed for potentially health-relevant parameters. Thresholds for parameters were defined based on potential health hazards of daily drinking. The average alcoholic strength of unrecorded wine products was 14.9% vol, and 47.8% vol in unrecorded spirits. One half of the samples (n=57) showed acceptable alcohol quality. The other half (n=58) showed one or several deficits with the most prevalent problem being ethyl carbamate contamination (n=29). Other problems included copper (n=20), manganese (n=16) and acetaldehyde (n=12). All other parameters (including methanol, higher alcohols, phthalates) were only seldom problematic (limit exceedance in less than 10 samples). The price of unrecorded alcohol was approximately 45% of the price of recorded alcohol. The major problem regarding unrecorded alcohol appears to be ethanol itself, as it is often higher in strength and its lower price may further contribute to higher drinking amounts. Compared to the health effects of ethanol, the contamination problems detected may be of minor importance as exposure will only in worst-case scenarios reach tolerable daily intakes of these substances.

  5. Numerical analyses of an ex-core fuel incident: Results of the OECD-IAEA Paks Fuel Project

    Energy Technology Data Exchange (ETDEWEB)

    Hozer, Z., E-mail: hozer@aeki.kfki.h [Hungarian Academy of Sciences KFKI Atomic Energy Research Institute, H-1525 Budapest, P.O. Box 49 (Hungary); Aszodi, A. [BME NTI Budapest (Hungary); Barnak, M. [IVS, Trnava (Slovakia); Boros, I. [BME NTI Budapest (Hungary); Fogel, M. [VUJE, Trnava (Slovakia); Guillard, V. [IRSN, Cadarache (France); Gyori, Cs. [ITU, EU, Karlsruhe (Germany); Hegyi, G. [Hungarian Academy of Sciences KFKI Atomic Energy Research Institute, H-1525 Budapest, P.O. Box 49 (Hungary); Horvath, G.L. [VEIKI, Budapest (Hungary); Nagy, I. [Hungarian Academy of Sciences KFKI Atomic Energy Research Institute, H-1525 Budapest, P.O. Box 49 (Hungary); Junninen, P. [VTT, Espoo (Finland); Kobzar, V. [KI, Moscow (Russian Federation); Legradi, G. [BME NTI Budapest (Hungary); Molnar, A. [Hungarian Academy of Sciences KFKI Atomic Energy Research Institute, H-1525 Budapest, P.O. Box 49 (Hungary); Pietarinen, K. [VTT, Espoo (Finland); Perneczky, L. [Hungarian Academy of Sciences KFKI Atomic Energy Research Institute, H-1525 Budapest, P.O. Box 49 (Hungary); Makihara, Y. [ATMEA, Paris (France); Matejovic, P. [IVS, Trnava (Slovakia); Perez-Fero, E.; Slonszki, E. [Hungarian Academy of Sciences KFKI Atomic Energy Research Institute, H-1525 Budapest, P.O. Box 49 (Hungary)

    2010-03-15

    The OECD-IAEA Paks Fuel Project was developed to support the understanding of fuel behaviour in accident conditions on the basis of analyses of the Paks-2 incident. Numerical simulation of the most relevant aspects of the event and comparison of the calculation results with the available data from the incident was carried out between 2006 and 2007. A database was compiled to provide input for the code calculations. The activities covered the following three areas: (a) Thermal hydraulic calculations described the cooling conditions possibly established during the incident. (b) Simulation of fuel behaviour described the oxidation and degradation mechanisms of the fuel assemblies. (c) The release of fission products from the failed fuel rods was estimated and compared to available measured data. The applied used codes captured the most important events of the Paks-2 incident and the calculated results improved the understanding of the causes and mechanisms of fuel failure. The numerical analyses showed that the by-pass flow leading to insufficient cooling amounted to 75-90% of the inlet flow rate, the maximum temperature in the tank was between 1200 and 1400 deg. C, the degree of zirconium oxidation reached 4-12% and the mass of produced hydrogen was between 3 and 13 kg.

  6. 3.6-m Devasthal Optical Telescope Project: Completion and first results

    Science.gov (United States)

    Kumar, Brijesh; Omar, Amitesh; Maheswar, Gopinathan; Pandey, Anil Kumar; Sagar, Ram; Uddin, Wahab; Sanwal, Basant Ballabh; Bangia, Tarun; Kumar, Tripurari Satyanarayana; Yadav, Shobhit; Sahu, Sanjit; Pant, Jayshreekar; Reddy, Bheemireddy Krishna; Gupta, Alok Chandra; Chand, Hum; Pandey, Jeewan Chandra; Joshi, Mohit Kumar; Jaiswar, Mukeshkuma; Nanjappa, Nandish; Purushottam; Yadav, Rama Kant Singh; Sharma, Saurabh; Pandey, Shashi Bhushan; Joshi, Santosh; Joshi, Yogesh Chandra; Lata, Sneh; Mehdi, Biman Jyoti; Misra, Kuntal; Singh, Mahendra

    2018-04-01

    We present an update on the 3.6-m aperture optical telescope, which has been installed at Devasthal in the year 2016. In this paper, a brief overview of installation activities at site and first results are presented. The 3.6-m Devasthal Optical Telescope project was initiated in 2007 by the Aryabhatta Research Institute of Observational Sciences (ARIES; Nainital, India) in partnership with Belgium. The telescope has Ritchey-Chretien optics, an alt-azimuth mount, an active control of the primary and a corrected science field of view of 30' at the Cassegrain focus. The construction of the telescope enclosure building was completed in June 2014 and after successful installation of the telescope. The first engineering light was obtained on 22 March 2015. The on-sky performance of the telescope was carried out till February 2016.

  7. Why good projects fail anyway.

    Science.gov (United States)

    Matta, Nadim F; Ashkenas, Ronald N

    2003-09-01

    Big projects fail at an astonishing rate--more than half the time, by some estimates. It's not hard to understand why. Complicated long-term projects are customarily developed by a series of teams working along parallel tracks. If managers fail to anticipate everything that might fall through the cracks, those tracks will not converge successfully at the end to reach the goal. Take a companywide CRM project. Traditionally, one team might analyze customers, another select the software, a third develop training programs, and so forth. When the project's finally complete, though, it may turn out that the salespeople won't enter in the requisite data because they don't understand why they need to. This very problem has, in fact, derailed many CRM programs at major organizations. There is a way to uncover unanticipated problems while the project is still in development. The key is to inject into the overall plan a series of miniprojects, or "rapid-results initiatives," which each have as their goal a miniature version of the overall goal. In the CRM project, a single team might be charged with increasing the revenues of one sales group in one region by 25% within four months. To reach that goal, team members would have to draw on the work of all the parallel teams. But in just four months, they would discover the salespeople's resistance and probably other unforeseen issues, such as, perhaps, the need to divvy up commissions for joint-selling efforts. The World Bank has used rapid-results initiatives to great effect to keep a sweeping 16-year project on track and deliver visible results years ahead of schedule. In taking an in-depth look at this project, and others, the authors show why this approach is so effective and how the initiatives are managed in conjunction with more traditional project activities.

  8. EuReDatA - project groups: An overview of objectives and results

    International Nuclear Information System (INIS)

    Luisi, T.

    1986-01-01

    The EuReDatA Association was formed to harmonize research and development work in the field of Reliability Data Banks, in particular by promoting the adoption of agreed definitions and procedures aimed at the exchange of information and experience on reliability data acquisition among members. To solve the problems arising from the organization and control of the large effort various ad-hoc project groups were created to work out solutions for specific topics. This paper describes the effort made and the results obtained by such specialized groups which have already produced reports that could be utilized by people active in an ever-widening variety of disciplines to facilitate the useful exchange of reliability information among them. (orig./DG)

  9. Dataset Preservation for the Long Term: Results of the DareLux Project

    Directory of Open Access Journals (Sweden)

    Eugène Dürr

    2008-08-01

    Full Text Available The purpose of the DareLux (Data Archiving River Environment Luxembourg Project was the preservation of unique and irreplaceable datasets, for which we chose hydrology data that will be required to be used in future climatic models. The results are: an operational archive built with XML containers, the OAI-PMH protocol and an architecture based upon web services. Major conclusions are: quality control on ingest is important; digital rights management demands attention; and cost aspects of ingest and retrieval cannot be underestimated. We propose a new paradigm for information retrieval of this type of dataset. We recommend research into visualisation tools for the search and retrieval of this type of dataset.

  10. Monitoring result analyses of high slope of five-step ship lock in the Three Gorges Project

    Directory of Open Access Journals (Sweden)

    Qixiang Fan

    2015-04-01

    Full Text Available The construction of the double-lane five-step ship lock of the Three Gorges Project (TGP was commenced in 1994, the excavation of the ship lock was completed by the end of 1999, and the ship lock was put in operation in June 2003. The side slopes of the ship lock are characterized by great height (170 m, steepness (70 m in height of upright slope, and great length (over 7000 m in total length. In association with the ship lock, the surrounding rocks in slope have a high potential to deform, with which the magnitude of deformation is restricted. Monitoring results show that the deformation of the five-step ship lock high slopes of the TGP primarily occurred in excavation period, and deformation tended to be stable and convergent during operation period, suggesting the allowable ranges of deformation. At present, the slopes and lock chambers are stable, and the ship lock works well under normal operation condition, enabling the social and economic benefits of the TGP.

  11. Maya Studio Projects Texturing and Lighting

    CERN Document Server

    Lanier, Lee

    2011-01-01

    Learn to create realistic digital assets for film and games with this project-based guide Focused entirely on practical projects, this hands-on guide shows you how to use Maya's texturing and lighting tools in real-world situations. Whether you need to sharpen your skills or you're looking to break into the field for the first time, you'll learn top industry techniques for this important skill as you follow the instructions for several specific projects. You can even create your own version, using final Maya scene files to validate results. The companion DVD includes supplemental videos, proje

  12. Uncertain socioeconomic projections used in travel demand and emissions models: could plausible errors result in air quality nonconformity?

    International Nuclear Information System (INIS)

    Rodier, C.J.; Johnston, R.A.

    2002-01-01

    A sensitivity analysis of plausible errors in population, employment, fuel price, and income projections is conducted using the travel demand and emissions models of the Sacramento, CA, USA, region for their transportation plan. The results of the analyses indicate that plausible error ranges for household income and fuel prices are not a significant source of uncertainty with respect to the region's travel demand and emissions projections. However, plausible errors in population and employment projections (within approximately one standard deviation) may result in the region's transportation plan not meeting the conformity test for nitrogens of oxides (NO x ) in the year 2005 (i.e., an approximately 16% probability). This outcome is also possible in the year 2015 but less likely (within approximately two standard deviations or a 2.5% probability). Errors in socioeconomic projections are only one of many sources of error in travel demand and emissions models. These results have several policy implications. First, regions like Sacramento that meet their conformity tests by a very small margin should rethink new highway investment and consider contingency transportation plans that incorporate more aggressive emissions reduction policies. Second, regional transportation planning agencies should conduct sensitivity analyses as part of their conformity analysis to make explicit significant uncertainties in the methods and to identify the probability of their transportation plan not conforming. Third, the US Environmental Protection Agency (EPA) should clarify the interpretation of ''demonstrate'' conformity of transportation plans; that is, specify the level of certainty that it considers a sufficient demonstration of conformity. (author)

  13. Market trends in the U.S. ESCO industry: Results from the NAESCO database project; TOPICAL

    International Nuclear Information System (INIS)

    Goldman, Charles A.; Osborn, Julie G.; Hopper, Nicole C.; Singer, Terry E.

    2002-01-01

    The U.S. Energy Services Company (ESCO) industry is often cited as the most successful model for the private sector delivery of energy-efficiency services. This study documents actual performance of the ESCO industry in order to provide policymakers and investors with objective information and customers with a resource for benchmarking proposed projects relative to industry performance. We have assembled a database of nearly 1500 case studies of energy-efficiency projects-the most comprehensive data set of the U.S. ESCO industry available. These projects include$2.55B of work completed by 51 ESCOs and span much of the history of this industry. We estimate that the ESCO industry completed$1.8-2.1B of projects in 2000. The industry has grown rapidly over the last decade with revenues increasing at a 24% annualized rate. We summarize and compare project characteristics and costs and analyze energy savings, including the relationship between predicted and actual savings. ESCOs typically invested about$2.30/ft(sup 2) per project in various energy efficiency improvements, although there is large variation in project costs within and across market segments. We find that lighting-only projects report median electricity savings of 47% of targeted equipment consumption; the median for lighting- and -non-lighting projects is 23% of the total electric bill baseline. We examine project economics, including project net benefits, benefit/cost ratio and simple payback time. Median simple payback time is seven years for institutional sector projects and three years in the private sector. We estimate direct economic benefits of$1.62 billion for the 1080 projects in our database with both cost and savings data. The median benefit/cost ratio is 2.1 for 309 private sector projects and 1.6 for 771 institutional sector projects. We discuss the role of policies and programs adopted by state/federal legislatures and agencies that have played an important role in stimulating ESCO activity

  14. ECLogger: Cross-Project Catch-Block Logging Prediction Using Ensemble of Classifiers

    Directory of Open Access Journals (Sweden)

    Sangeeta Lal

    2017-01-01

    Full Text Available Background: Software developers insert log statements in the source code to record program execution information. However, optimizing the number of log statements in the source code is challenging. Machine learning based within-project logging prediction tools, proposed in previous studies, may not be suitable for new or small software projects. For such software projects, we can use cross-project logging prediction. Aim: The aim of the study presented here is to investigate cross-project logging prediction methods and techniques. Method: The proposed method is ECLogger, which is a novel, ensemble-based, cross-project, catch-block logging prediction model. In the research We use 9 base classifiers were used and combined using ensemble techniques. The performance of ECLogger was evaluated on on three open-source Java projects: Tomcat, CloudStack and Hadoop. Results: ECLogger Bagging, ECLogger AverageVote, and ECLogger MajorityVote show a considerable improvement in the average Logged F-measure (LF on 3, 5, and 4 source -> target project pairs, respectively, compared to the baseline classifiers. ECLogger AverageVote performs best and shows improvements of 3.12% (average LF and 6.08% (average ACC – Accuracy. Conclusion: The classifier based on ensemble techniques, such as bagging, average vote, and majority vote outperforms the baseline classifier. Overall, the ECLogger AverageVote model performs best. The results show that the CloudStack project is more generalizable than the other projects.

  15. New concept for condition management of plants as a result of the KUNTO project. New operations approach reduces costs

    Energy Technology Data Exchange (ETDEWEB)

    McNiven, U.; Tamminen, L.

    1998-07-01

    IVO Generation Services Ltd. has carried out a project at the IVO Naantali power plant to develop the plants condition management. The project defines critical and monitored components for each system. In addition, recommendations for further action, investment proposals and suggestions for changes in maintenance and operations practices were supplied for the various systems in the plant. The systematic approach which was the result of the projects integrated into maintenance and operations practices where data collection and analysis is part of the routine. Up-to-date data is utilized in focusing maintenance and investments, in planning and reporting functions

  16. FUNMIG Integrated Project results and conclusions from a safety case perspective

    International Nuclear Information System (INIS)

    Schwyn, B.; Wersin, P.; Rüedi, J.; Schneider, J.; Altmann, S.; Missana, T.; Noseck, U.

    2012-01-01

    The scope of the FUNMIG Integrated Project (IP) was to improve the knowledge base on biogeochemical processes in the geosphere which are relevant for the safety of radioactive waste repositories. An important part of this project involved the interaction between data producers (research) and data users (radioactive waste management organisations in Europe). The aim thereof was to foster the benefits of the research work for performance assessment (PA), and in a broader sense, for the safety case of radioactive waste repositories. For this purpose a specifically adapted procedure was elaborated. Thus, relevant features, events and processes (FEPs) for the three host rock types, clay, crystalline and salt, were taken from internationally accepted catalogues and mapped onto each of the 108 research tasks conducted during the FUNMIG project by a standardised procedure. The main outcome thereof was a host-rock specific tool (Task Evaluation Table) in which the relevance and benefits of the research results were evaluated both from the PA and research perspective. Virtually all generated data within FUNMIG are related to the safety-relevant FEP-groups “transport mechanisms” and “retardation”. Generally speaking, much of the work within FUNMIG helped to support and to increase confidence in the simplified PA transport and retardation models used for calculating radionuclide (RN) transport through the host rock. Some of the studies on retardation processes (e.g. coupled sorption-redox processes at the mineral–water interface) yielded valuable data for all three rock types dealt within the IP. However, most of the studies provided improved insight regarding host-rock specific features and processes, the majority of this work being dedicated to clay-rich and crystalline host rocks. For both of these host rock types, FUNMIG has significantly contributed to improving understanding on a conceptual level, both by providing new experimental data at different spatial

  17. NASA Intelligent Systems Project: Results, Accomplishments and Impact on Science Missions

    Science.gov (United States)

    Coughlan, Joseph C.

    2005-01-01

    The Intelligent Systems Project was responsible for much of NASA's programmatic investment in artificial intelligence and advanced information technologies. IS has completed three major project milestones which demonstrated increased capabilities in autonomy, human centered computing, and intelligent data understanding. Autonomy involves the ability of a robot to place an instrument on a remote surface with a single command cycle. Human centered computing supported a collaborative, mission centric data and planning system for the Mars Exploration Rovers and data understanding has produced key components of a terrestrial satellite observation system with automated modeling and data analysis capabilities. This paper summarizes the technology demonstrations and metrics which quantify and summarize these new technologies which are now available for future Nasa missions.

  18. The Virtual Factory Teaching System (VFTS): Project Review and Results.

    Science.gov (United States)

    Kazlauskas, E. J.; Boyd, E. F., III; Dessouky, M. M.

    This paper presents a review of the Virtual Factory Teaching (VFTS) project, a Web-based, multimedia collaborative learning network. The system allows students, working alone or in teams, to build factories, forecast demand for products, plan production, establish release rules for new work into the factory, and set scheduling rules for…

  19. Building the US National Fusion Grid: results from the National Fusion Collaboratory Project

    International Nuclear Information System (INIS)

    Schissel, D.P.; Burruss, J.R.; Finkelstein, A.; Flanagan, S.M.; Foster, I.T.; Fredian, T.W.; Greenwald, M.J.; Johnson, C.R.; Keahey, K.; Klasky, S.A.; Li, K.; McCune, D.C.; Papka, M.; Peng, Q.; Randerson, L.; Sanderson, A.; Stillerman, J.; Stevens, R.; Thompson, M.R.; Wallace, G.

    2004-01-01

    The US National Fusion Collaboratory Project is developing a persistent infrastructure to enable scientific collaboration for all aspects of magnetic fusion research. The project is creating a robust, user-friendly collaborative software environment and making it available to more than 1000 fusion scientists in 40 institutions who perform magnetic fusion research in the United States. In particular, the project is developing and deploying a national Fusion Energy Sciences Grid (FusionGrid) that is a system for secure sharing of computation, visualization, and data resources over the Internet. The FusionGrid goal is to allow scientists at remote sites to fully participate in experimental and computational activities as if they were working at a common site thereby creating a virtual organization of the US fusion community. The project is funded by the USDOE Office of Science, Scientific Discovery through Advanced Computing (SciDAC) Program and unites fusion and computer science researchers to directly address these challenges

  20. The international 2D/3D project as a consequence of the results of emergency core cooling

    International Nuclear Information System (INIS)

    Mayinger, F.

    1980-01-01

    As a part of the trilateral co-operation between the Federal Republic of Germany, Japan and the USA large projects have been set about which are adapted to one another by contract and closely coupled as regards the test performance as well as the analysis of the results. These projects simulate on a 1:1 scale the constructive situations in the reactor and verify the fluid dynamic conditions for the heat transport. The experimental investigations are closely coupled with theoretical analyses as a part of the development of a new generation of tridimensional computer codes. (orig./HP) [de

  1. Multi-Agent Modeling in Managing Six Sigma Projects

    Directory of Open Access Journals (Sweden)

    K. Y. Chau

    2009-10-01

    Full Text Available In this paper, a multi-agent model is proposed for considering the human resources factor in decision making in relation to the six sigma project. The proposed multi-agent system is expected to increase the acccuracy of project prioritization and to stabilize the human resources service level. A simulation of the proposed multiagent model is conducted. The results show that a multi-agent model which takes into consideration human resources when making decisions about project selection and project team formation is important in enabling efficient and effective project management. The multi-agent modeling approach provides an alternative approach for improving communication and the autonomy of six sigma projects in business organizations.

  2. FALSIRE results for NKS-3 and NKS-4

    International Nuclear Information System (INIS)

    Stumpfrock, L.

    1993-01-01

    In the framework of the project NKS funded by the Federal Minister of Research and Technology, MPA Stuttgart conducted up to now 7 pressurized thermal shock experiments. The purpose of the experimental and numerical investigations in the research project was to study the crack propagation behavior of circumferential flaws on the inner surface of the test specimens. Experiments NKS-3 and NKS-4 were selected as reference experiments in the project FALSIRE. In this paper the authors give a review of the experiments and the experimental results and an overview of the analysis results presented at the FALSIRE workshop in 1990. It is shown that the post calculations of the NKS-3 specimen during the CSNI project FALSIRE provided fracture mechanics results in a relatively small scatterband. The NKS-4 results showed a greater scatterband, but the main reasons could be explained. 5 refs., 28 figs., 4 tabs

  3. Performance assurance of the re-applying project documentation

    Science.gov (United States)

    Kozlova, Olga

    2017-10-01

    Usage of the re-applying project documentation is cost effective measure. Saving of budgetary funds for purchases for development of new project documentation occurs by means of it. It also becomes possible to consider better decisions and prevent the repetition of mistakes. Nowadays, state authorities in construction management are forming separate institute for re-applying project documentation. The article shows the main tasks of such events and the issues to be solved for achievement of a high positive result.

  4. Uncertainty of runoff projections under changing climate in Wami River sub-basin

    Directory of Open Access Journals (Sweden)

    Frank Joseph Wambura

    2015-09-01

    New Hydrological Insights for the Region: The results of projected streamflow shows that the baseline annual climatology flow (ACF is 98 m3/s and for the future, the median ACF is projected to be 81 m3/s. At 100% uncertainty of skilled projections, the ACF from the sub-basin is projected to range between −47% and +36% from the baseline ACF. However, the midstream of the sub-basin shows reliable water availability for foreseen water uses expansion up to the year 2039.

  5. Virtual enterprise architecture and methodology - Initial results from the Globeman21 project

    DEFF Research Database (Denmark)

    Vesterager, Johan; Larsen, Lars Bjørn; Gobbi, Chiara

    1999-01-01

    This paper will focus on presenting the initial results from the IMS project Globeman21 regarding generic models for Extended Enterprise Management (EEM). In particular the paper outlines a proposed architecture for the creation of virtual enterprises, industrial requirements regarding the generic...... models, terminology for describing extended enterprises, and initial considerations regarding a methodology for EEM. Globeman21 see the extended enterprise as a concept covering the totality of different concepts dealing with the expansion or extension of enterprise activities. One way of realising...... the concept of extended enterprise is through the creation of virtual enterprise, based on a more or less formalised network. This approach is the basis for the development of the generic EEM model within Globeman21....

  6. Outcome results for the Ma'alahi Youth Project, a Tongan community-based obesity prevention programme for adolescents.

    Science.gov (United States)

    Fotu, K F; Millar, L; Mavoa, H; Kremer, P; Moodie, M; Snowdon, W; Utter, J; Vivili, P; Schultz, J T; Malakellis, M; McCabe, M P; Roberts, G; Swinburn, B A

    2011-11-01

    Tonga has a very high prevalence of obesity with steep increases during youth, making adolescence a critical time for obesity prevention. The Ma'alahi Youth Project, the Tongan arm of the Pacific Obesity Prevention in Communities project, was a 3-year, quasi-experimental study of community-based interventions among adolescents in three districts on Tonga's main island (Tongatapu) compared to the island of Vava'u. Interventions focused mainly on capacity building, social marketing, education and activities promoting physical activity and local fruit and vegetables. The evaluation used a longitudinal design (mean follow-up duration 2.4 years). Both intervention and comparison groups showed similar large increases in overweight and obesity prevalence (10.1% points, n = 815; 12.6% points, n = 897 respectively). Apart from a small relative decrease in percentage body fat in the intervention group (-1.5%, P Youth Project had no impact on the large increase in prevalence of overweight and obesity among Tongan adolescents. Community-based interventions in such populations with high obesity prevalence may require more intensive or longer interventions, as well as specific strategies targeting the substantial socio-cultural barriers to achieving a healthy weight. © 2011 The Authors. obesity reviews © 2011 International Association for the Study of Obesity.

  7. Gaseous time projection chambers for rare event detection: results from the T-REX project. II. Dark matter

    Energy Technology Data Exchange (ETDEWEB)

    Irastorza, I.G.; Aznar, F.; Castel, J., E-mail: igor.irastorza@cern.ch, E-mail: faznar@unizar.es, E-mail: jfcastel@unizar.es [Grupo de Física Nuclear y Astropartículas, Departamento de Física Teórica, Universidad de Zaragoza, C/ P. Cerbuna 12, Zaragoza, 50009 Spain (Spain); and others

    2016-01-01

    As part of the T-REX project, a number of R and D and prototyping activities have been carried out during the last years to explore the applicability of gaseous Time Projection Chambers (TPCs) with Micromesh Gas Structures (Micromegas) in rare event searches like double beta decay, axion research and low-mass WIMP searches. While in the companion paper we focus on double beta decay, in this paper we focus on the results regarding the search for dark matter candidates, both axions and WIMPs. Small (few cm wide) ultra-low background Micromegas detectors are used to image the axion-induced x-ray signal expected in axion helioscopes like the CERN Axion Solar Telescope (CAST) experiment. Background levels as low as 0.8 × 10{sup −6} counts keV{sup −1} cm{sup −2} s{sup −1} have already been achieved in CAST while values down to ∼10{sup −7} counts keV{sup −1} cm{sup −2} s{sup −1} have been obtained in a test bench placed underground in the Laboratorio Subterráneo de Canfranc (LSC). Prospects to consolidate and further reduce these values down to ∼10{sup −8} counts keV{sup −1} cm{sup −2} s{sup −1} will be described. Such detectors, placed at the focal point of x-ray telescopes in the future International Axion Observatory (IAXO), would allow for 10{sup 5} better signal-to-noise ratio than CAST, and search for solar axions with g{sub a}γ down to few 10{sup 12} GeV{sup −1}, well into unexplored axion parameter space. In addition, a scaled-up version of these TPCs, properly shielded and placed underground, can be competitive in the search for low-mass WIMPs. The TREX-DM prototype, with ∼ 0.300 kg of Ar at 10 bar, or alternatively ∼ 0.160 kg of Ne at 10 bar, and energy threshold well below 1 keV, has been built to test this concept. We will describe the main technical solutions developed, as well as the results from the commissioning phase on surface. The anticipated sensitivity of this technique might reach ∼10{sup −44} cm{sup 2} for

  8. Understanding map projections: Chapter 15

    Science.gov (United States)

    Usery, E. Lynn; Kent, Alexander J.; Vujakovic, Peter

    2018-01-01

    It has probably never been more important in the history of cartography than now that people understand how maps work. With increasing globalization, for example, world maps provide a key format for the transmission of information, but are often poorly used. Examples of poor understanding and use of projections and the resultant maps are many; for instance, the use of rectangular world maps in the United Kingdom press to show Chinese and Korean missile ranges as circles, something which can only be achieved on equidistant projections and then only from one launch point (Vujakovic, 2014).

  9. Clustering ERP implementation project activities: a foundation for project size definition

    NARCIS (Netherlands)

    Janssens, G.; Kusters, R.J.; Heemstra, F.J.; Sadiq, A.; Reichert, M.; Schultz, K.; Trienekens, J.J.M.; Moller, C.; Kusters, R.J.

    2007-01-01

    The size of an ERP project can be a useful measurement for predicting the effort needed to complete an ERP implementation project. Because this measurement does not exist, research is needed to find a set of variables which can define the size of an ERP implementation project. This paper shows 21

  10. [Social media: forum webcare as a proactive information strategy in health promotion: Results of a pilot project by the BZgA].

    Science.gov (United States)

    Quast, T; Nöcker, Guido

    2015-09-01

    Over several weeks in 2013, the BZgA pilot project "SoMe" (August 2012 to February 2014) tested and investigated various social media interventions in the fields of family planning and sex education. The interventions included the tool "forum webcare," which was used in four forums for pregnant women and three for young people. The term webcare originally described a customer-oriented communication strategy of the web economy. The term includes elements of reputation management, customer care, and online marketing. In the present pilot project, forum webcare has been understood and applied in the sense of "virtual street work," which means that issues on health topics in non-self-operated forums were identified and answered. The design was based on the Precede-Proceed Model. In the phases of analysis, implementation, and evaluation the project used chronologically and methodologically interlaced and mutually controlling methods such as online test groups, intensive interviews, and the evaluation of data on web use. The analysis indicated that the target groups of the project used the forums quite often; that they had a positive attitude toward the idea of webcare providing contributions from experts working for public institutions; and that the risk of reactance was low. Forum webcare allows important supplementary and well-founded information to be brought into the discussions. At the same time the results of the project show that users, when keeping to certain rules, mostly see webcare as a welcome addition to incomplete information and the improvement of faulty information, and appreciate it as quality enhancement for the forum. From the view of the information provider, forum webcare is more a chance to address numerous passive recipients rather than communicating with single users. At the same time the instrument provides the chance to learn from users of the forums, and to become familiar with and be able to respond to their needs and the way in which they

  11. First results from the LIFE project: discovery of two magnetic hot evolved stars

    Science.gov (United States)

    Martin, A. J.; Neiner, C.; Oksala, M. E.; Wade, G. A.; Keszthelyi, Z.; Fossati, L.; Marcolino, W.; Mathis, S.; Georgy, C.

    2018-04-01

    We present the initial results of the Large Impact of magnetic Fields on the Evolution of hot stars (LIFE) project. The focus of this project is the search for magnetic fields in evolved OBA giants and supergiants with visual magnitudes between 4 and 8, with the aim to investigate how the magnetic fields observed in upper main-sequence (MS) stars evolve from the MS until the late post-MS stages. In this paper, we present spectropolarimetric observations of 15 stars observed using the ESPaDOnS instrument of the Canada-France-Hawaii Telescope. For each star, we have determined the fundamental parameters and have used stellar evolution models to calculate their mass, age, and radius. Using the least-squared deconvolution technique, we have produced averaged line profiles for each star. From these profiles, we have measured the longitudinal magnetic field strength and have calculated the detection probability. We report the detection of magnetic fields in two stars of our sample: a weak field of Bl = 1.0 ± 0.2 G is detected in the post-MS A5 star 19 Aur and a stronger field of Bl = -230 ± 10 G is detected in the MS/post-MS B8/9 star HR 3042.

  12. Innovative Urban Water Management as a Climate Change Adaptation Strategy: Results from the Implementation of the Project “Water Against Climate Change (WATACLIC”

    Directory of Open Access Journals (Sweden)

    Ilaria Principi

    2012-12-01

    Full Text Available The excessive use of water is damaging European groundwater and rivers: their environmental conditions are often below the “good status” that—according to Water Framework Directive 2000/60—should be reached by 2015. The already critical situation is tending to get worse because of climate change. Even in water rich countries, urban wastewater is still one of the main sources of water pollution. Currently, urban soil sealing and “conventional” rainwater management, which were planned to quickly move rainwater away from roofs and streets, are increasing the flood risk. “Green” technologies and approaches would permit a reduction in water abstraction and wastewater production while improving urban hydrological response to heavy rains. The Life+ WATACLIC project has been implemented to promote such sustainable technologies and approaches in Italy, however the results show huge difficulties: apparently water saving and sustainable urban water management have only low interest amongst the general public and even with public administrations and the relevant industrial sectors. In such a cultural and technical context, the project is bringing a new point of view to public debate. In the long term, the project will certainly have a positive impact, but most likely it will require more time than initially expected.

  13. FPGAs in High Perfomance Computing: Results from Two LDRD Projects.

    Energy Technology Data Exchange (ETDEWEB)

    Underwood, Keith D; Ulmer, Craig D.; Thompson, David; Hemmert, Karl Scott

    2006-11-01

    Field programmable gate arrays (FPGAs) have been used as alternative computational de-vices for over a decade; however, they have not been used for traditional scientific com-puting due to their perceived lack of floating-point performance. In recent years, there hasbeen a surge of interest in alternatives to traditional microprocessors for high performancecomputing. Sandia National Labs began two projects to determine whether FPGAs wouldbe a suitable alternative to microprocessors for high performance scientific computing and,if so, how they should be integrated into the system. We present results that indicate thatFPGAs could have a significant impact on future systems. FPGAs have thepotentialtohave order of magnitude levels of performance wins on several key algorithms; however,there are serious questions as to whether the system integration challenge can be met. Fur-thermore, there remain challenges in FPGA programming and system level reliability whenusing FPGA devices.4 AcknowledgmentArun Rodrigues provided valuable support and assistance in the use of the Structural Sim-ulation Toolkit within an FPGA context. Curtis Janssen and Steve Plimpton provided valu-able insights into the workings of two Sandia applications (MPQC and LAMMPS, respec-tively).5

  14. The 150 ns detector project: Prototype preamplifier results

    Science.gov (United States)

    Warburton, W. K.; Russell, S. R.; Kleinfelder, Stuart A.

    1994-08-01

    The long-term goal of the 150 ns detector project is to develop a pixel area detector capable of 6 MHz frame rates (150 ns/frame). Our milestones toward this goal are: a single pixel, 1×256 1D and 8×8 2D detectors, 256×256 2D detectors and, finally, 1024 × 1024 2D detectors. The design strategy is to supply a complete electronics chain (resetting preamp, selectable gain amplifier, analog-to-digital converter (ADC), and memory) for each pixel. In the final detectors these will all be custom integrated circuits. The front-end preamplifiers are integrated first, since their design and performance are the most unusual and also critical to the project's success. Similarly, our early work is concentrated on devising and perfecting detector structures. In this paper we demonstrate the performance of prototypes of our integrated preamplifiers. While the final design will have 64 preamps to a chip, including a switchable gain stage, the prototypes were integrated 8 channels to a "Tiny Chip" and tested in 4 configurations (feedback capacitor Cf equal 2.5 or 4.0 pF, output directly or through a source follower). These devices have been tested thoroughly for reset settling times, gain, linearity, and electronic noise. They generally work as designed, being fast enough to easily integrate detector charge, settle, and reset in 150 ns. Gain and linearity appear to be acceptable. Current values of electronic noise, in double-sampling mode, are about twice the design goal of {2}/{3} of a single photon at 6 keV. We expect this figure to improve with the addition of the onboard amplifier stage and improved packaging. Our next test chip will include these improvements and allow testing with our first detector samples, which will be 1×256 (50 μm wide pixels) and 8×8 (1 mm 2 pixels) element detector on 1 mm thick silicon.

  15. The Results of Development of the Project ZOOINT and its Future Perspectives

    Science.gov (United States)

    Smirnov, I. S.; Lobanov, A. L.; Alimov, A. F.; Medvedev, S. G.; Golikov, A. A.

    The work on a computerization of main processes of accumulation and analysis of the collection, expert and literary data on a systematics and faunistics of various taxa of animal (a basis of studying of a biological diversity) was started in the Zoological Institute in 1987. In 1991 the idea of creating of the software package, ZOOlogical INTegrated system (ZOOINT) was born. ZOOINT could provide a loading operation about collections and simultaneously would allow to analyze the accumulated data with the help of various queries. During execution, the project ZOOINT was transformed slightly and has given results a little bit distinguished from planned earlier, but even more valuable. In the Internet the site about the information retrieval system (IRS) ZOOINT was built also ( ZOOINT ). The implementation of remote access to the taxonomic information, with possibility to work with databases (DB) of the IRS ZOOINT in the on-line mode was scheduled. It has required not only innovation of computer park of the developers and users, but also mastering of new software: language HTML, operating system of Windows NT, and technology of Active Server Pages (ASP). One of the serious problems of creating of databases and the IRS on zoology is the problem of representation of hierarchical classification. Building the classifiers, specialized standard taxonomic databases, which have obtained the name ZOOCOD solved this problem. The lately magnified number of attempts of creating of taxonomic electronic lists, tables and DB has required development of some primary rules of unification of zoological systematic databases. These rules assume their application in institutes of the biological profile, in which the processes of a computerization are very slowly, and the building of databases is in the most rudimentary state. These some positions and the standards of construction of biological (taxonomic) databases should facilitate dialogue of the biologists, application in the near

  16. Project 2010 For Dummies

    CERN Document Server

    Muir, Nancy C

    2010-01-01

    A friendly reference guide to Microsoft Project, the leading enterprise project management software. As project management software, Microsoft Project allows you to oversee your business activities effectively. You can manage resources, share project info, perform modeling and scenario analysis, and standardize reporting processes. This easy-to-understand guide is completely updated to cover the latest changes and newest enhancements to Project 2010 and shows you how to get Project 2010 to work for you. After an introduction to basic project management concepts, you'll discover the mechanics o

  17. Project characteristics monitoring report: BWIP (Basalt Waste Isolation Program) repository project

    Energy Technology Data Exchange (ETDEWEB)

    Friedli, E.A.; Herborn, D.I.; Taylor, C.D.; Tomlinson, K.M.

    1988-03-01

    This monitoring report has been prepared to show compliance with provisions of the Nuclear Waste Policy Act of 1982 (NWPA) and to provide local and state government agencies with information concerning the Basalt Waste Isolation Program (BWIP). This report contains data for the time period May 26, 1986 to February 1988. The data include employment figures, salaries, project purchases, taxes and fees paid, worker survey results, and project closedown personal interview summaries. This information has become particularly important since the decision in December 1987 to stop all BWIP activities except those for site reclamation. The Nuclear Waste Policy Amendments Act of 1987 requires nonreclamation work at the Hanford Site to stop as of March 22, 1988. 7 refs., 6 figs., 28 tabs.

  18. Project characteristics monitoring report: BWIP [Basalt Waste Isolation Program] repository project

    International Nuclear Information System (INIS)

    Friedli, E.A.; Herborn, D.I.; Taylor, C.D.; Tomlinson, K.M.

    1988-03-01

    This monitoring report has been prepared to show compliance with provisions of the Nuclear Waste Policy Act of 1982 (NWPA) and to provide local and state government agencies with information concerning the Basalt Waste Isolation Program (BWIP). This report contains data for the time period May 26, 1986 to February 1988. The data include employment figures, salaries, project purchases, taxes and fees paid, worker survey results, and project closedown personal interview summaries. This information has become particularly important since the decision in December 1987 to stop all BWIP activities except those for site reclamation. The Nuclear Waste Policy Amendments Act of 1987 requires nonreclamation work at the Hanford Site to stop as of March 22, 1988. 7 refs., 6 figs., 28 tabs

  19. Computational Experiment Study on Selection Mechanism of Project Delivery Method Based on Complex Factors

    Directory of Open Access Journals (Sweden)

    Xiang Ding

    2014-01-01

    Full Text Available Project delivery planning is a key stage used by the project owner (or project investor for organizing design, construction, and other operations in a construction project. The main task in this stage is to select an appropriate project delivery method. In order to analyze different factors affecting the PDM selection, this paper establishes a multiagent model mainly to show how project complexity, governance strength, and market environment affect the project owner’s decision on PDM. Experiment results show that project owner usually choose Design-Build method when the project is very complex within a certain range. Besides, this paper points out that Design-Build method will be the prior choice when the potential contractors develop quickly. This paper provides the owners with methods and suggestions in terms of showing how the factors affect PDM selection, and it may improve the project performance.

  20. Types of treatment collaboration between conventional and alternative practitioners-results from a research project at a Danish MS hospital.

    Science.gov (United States)

    Skovgaard, Lasse; Haahr, Niels; Bjerre, Liv; Launsø, Laila

    2010-12-23

    More than 50% of People with Multiple Sclerosis (PwMS) in Denmark use alternative treatment. Most of them combine alternative and conventional treatment, but PwMS often find that they engage in parallel courses of treatment between which there is no dialogue, coordination or synergy. For this reason the Danish Multiple Sclerosis Society conducted a research project to develop and examine different models for collaboration between conventional and alternative treatment providers. The empirical material consisted of 10 individual interviews with practitioners, a group interview with practitioners, a group interview with professional staff at the Danish Multiple Sclerosis hospital that provided the organisational framework for the project, interviews with 59 patients and written responses from participating treatment providers in connection with 29 practitioner-researcher seminars held during the period 2004-2010. Collaboration between researchers and the treatment team resulted in the development and examination of several models which describe the strengths and weaknesses of various types of collaboration. The models show that the various types of collaboration place different requirements on the degree of 1) mutual acknowledgement and understanding among practitioners and 2) flexibility and resources in the organizational framework. The analyses also point to the fact that the degree of patient activity must be considered in relation to a given type of collaboration. The relationship between integration and pluralism can contribute to a fruitful discussion in regards to the value of treatment collaboration. In addition to the many positive perspectives that characterise integration of different treatment modalities the project points to the importance of not overlooking the opportunities, values and potential inherent in a pluralistic ideal in the form of patients' own active efforts and the dynamism that can arise when the patient becomes a co-informant, co

  1. Search Results | Page 56 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Showing 551 - 560 of 1131 results : "food" ... of health, environment and development outcomes in urban ecohealth project, Katmandu ... Journal articles ... change to better understand how climate stressors affect agricultural productivity, with ...

  2. Project Finance and Projects in the Energy Sector in Developing Countries

    OpenAIRE

    ERMELA KRIPA; HALIT XHAFA

    2013-01-01

    The purpose of this study is to show the importance of using project finance in infrastructure investments in developing countries. The paper will be focused only on one infrastructure sector, which is energy. Structurally, power project finance has involved largely buildown-transfer (BOT) project structures and long-term contracts. The projects largely reflect a rational allocation of risks among public and private participants. Private sponsors and lenders generally assume risks for complet...

  3. Small scale observation of magnetopause motion: preliminary results of the INTERBALL project

    Directory of Open Access Journals (Sweden)

    J. Safrankova

    Full Text Available Two satellites of the INTERBALL project were launched on 3 August 1995. The main goals of the present paper are (1 to give a brief information about the VDP plasma device onboard the INTERBALL-1 satellite, (2 to present the Faradays cup data taken in different magnetospheric regions and (3 to expose first results of the two satellite measurements of the magnetopause motion. The presented data illustrate magnetopause crossings as seen by two satellites when separated by about ~ 1000 km. This separation combined with the Faraday's cup time resolution allows to estimate the velocity of the magnetopause and to reconstruct a possible structure of the boundary. Simultaneous measurement of the magnetic field supports the interpretation of the observed ion fluxes as a signature of the wavy motion of the boundary.

  4. Teaching Basic Programming Concepts to Young Primary School Students Using Tablets: Results of a Pilot Project

    Science.gov (United States)

    Fokides, Emmanuel

    2018-01-01

    The study presents the results of a project in which tablets and a ready-made application were used for teaching basic programming concepts to young primary school students (ages 7-9). A total of 135 students participated in the study, attending primary schools in Athens, Greece, divided into three groups. The first was taught conventionally. The…

  5. Projection preconditioning for Lanczos-type methods

    Energy Technology Data Exchange (ETDEWEB)

    Bielawski, S.S.; Mulyarchik, S.G.; Popov, A.V. [Belarusian State Univ., Minsk (Belarus)

    1996-12-31

    We show how auxiliary subspaces and related projectors may be used for preconditioning nonsymmetric system of linear equations. It is shown that preconditioned in such a way (or projected) system is better conditioned than original system (at least if the coefficient matrix of the system to be solved is symmetrizable). Two approaches for solving projected system are outlined. The first one implies straightforward computation of the projected matrix and consequent using some direct or iterative method. The second approach is the projection preconditioning of conjugate gradient-type solver. The latter approach is developed here in context with biconjugate gradient iteration and some related Lanczos-type algorithms. Some possible particular choices of auxiliary subspaces are discussed. It is shown that one of them is equivalent to using colorings. Some results of numerical experiments are reported.

  6. Project Radon

    International Nuclear Information System (INIS)

    Ekholm, S.

    1988-01-01

    The project started in March 1987. The objective is to perform radon monitoring in 2000 dwellings occupied by people employed by State Power Board and to continue to contribute to the development of radon filters. The project participates in developing methods for radon measurement and decontamination and in adapting the methods to large scale application. About 400 so called radon trace measurements (coarse measurement) and about 10 action measurements (decontamination measurement) have been made so far. Experience shows that methods are fully applicable and that the decontamination measures recommended give perfectly satisfactory results. It is also established that most of the houses with high radon levels have poor ventilation Many of them suffer from moisture and mould problems. The work planned for 1988 and 1989 will in addition to measurements be directed towards improvement of the measuring methods. An activity catalogue will be prepared in cooperation with ventilation enterprises. (O.S.)

  7. A comparative study between matched and mis-matched projection/back projection pairs used with ASIRT reconstruction method

    International Nuclear Information System (INIS)

    Guedouar, R.; Zarrad, B.

    2010-01-01

    For algebraic reconstruction techniques both forward and back projection operators are needed. The ability to perform accurate reconstruction relies fundamentally on the forward projection and back projection methods which are usually, the transpose of each other. Even though the mis-matched pairs may introduce additional errors during the iterative process, the usefulness of mis-matched projector/back projector pairs has been proved in image reconstruction. This work investigates the performance of matched and mis-matched reconstruction pairs using popular forward projectors and their transposes when used in reconstruction tasks with additive simultaneous iterative reconstruction techniques (ASIRT) in a parallel beam approach. Simulated noiseless phantoms are used to compare the performance of the investigated pairs in terms of the root mean squared errors (RMSE) which are calculated between reconstructed slices and the reference in different regions. Results show that mis-matched projection/back projection pairs can promise more accuracy of reconstructed images than matched ones. The forward projection operator performance seems independent of the choice of the back projection operator and vice versa.

  8. A comparative study between matched and mis-matched projection/back projection pairs used with ASIRT reconstruction method

    Energy Technology Data Exchange (ETDEWEB)

    Guedouar, R., E-mail: raja_guedouar@yahoo.f [Higher School of Health Sciences and Techniques of Monastir, Av. Avicenne, 5060 Monastir, B.P. 128 (Tunisia); Zarrad, B., E-mail: boubakerzarrad@yahoo.f [Higher School of Health Sciences and Techniques of Monastir, Av. Avicenne, 5060 Monastir, B.P. 128 (Tunisia)

    2010-07-21

    For algebraic reconstruction techniques both forward and back projection operators are needed. The ability to perform accurate reconstruction relies fundamentally on the forward projection and back projection methods which are usually, the transpose of each other. Even though the mis-matched pairs may introduce additional errors during the iterative process, the usefulness of mis-matched projector/back projector pairs has been proved in image reconstruction. This work investigates the performance of matched and mis-matched reconstruction pairs using popular forward projectors and their transposes when used in reconstruction tasks with additive simultaneous iterative reconstruction techniques (ASIRT) in a parallel beam approach. Simulated noiseless phantoms are used to compare the performance of the investigated pairs in terms of the root mean squared errors (RMSE) which are calculated between reconstructed slices and the reference in different regions. Results show that mis-matched projection/back projection pairs can promise more accuracy of reconstructed images than matched ones. The forward projection operator performance seems independent of the choice of the back projection operator and vice versa.

  9. CO2 Injectivity in Geological Storages: an Overview of Program and Results of the GeoCarbone-Injectivity Project

    International Nuclear Information System (INIS)

    Lombard, J.M.; Egermann, P.; Azaroual, M.; Pironon, J.; Broseta, D.; Egermann, P.; Munier, G.; Mouronval, G.

    2010-01-01

    The objective of the GeoCarbone-Injectivity project was to develop a methodology to study the complex phenomena involved in the near well bore region during CO 2 injection. This paper presents an overview of the program and results of the project, and some further necessary developments. The proposed methodology is based on experiments and simulations at the core scale, in order to understand (physical modelling and definition of constitutive laws) and quantify (calibration of simulation tools) the mechanisms involved in injectivity variations: fluid/rock interactions, transport mechanisms, geomechanical effects. These mechanisms and the associated parameters have then to be integrated in the models at the well bore scale. The methodology has been applied for the study of a potential injection of CO 2 in the Dogger geological formation of the Paris Basin, in collaboration with the other ANR GeoCarbone projects. (authors)

  10. The TRAIN-project: railway safety and the train driver information environment and work situation. A summary of the main results

    Energy Technology Data Exchange (ETDEWEB)

    Kecklund, L. [MTO Psychology and Swedish National Rail Administration (Sweden); Ingre, M.; Kecklund, G.; Soederstroem, M.; Aakerstedt, T. [National Inst. for Psychosocial Factors and Health (Sweden); Lindberg, E. [Swedish National Rail Administration (Sweden); Jansson, A.; Olsson, E.; Sandblad, B. [Uppsala Univ. (Sweden). Dept. of Human-Computer Interaction; Almqvist, P. [Swedish State Railways (Sweden)

    2001-07-01

    The TRAIN project investigates traffic safety related risks, focusing in particular on the train driver work situation, use of information but also on the supporting safety organisation. It is an on-going project funded and managed by Swedish National Rail Administration and carried out by independent researchers. The project provides a multi-disciplinary investigation by use of a man-technology-organisation (MTO) perspective. Activities performed are task analysis, evaluation of the drivers use of information and interaction with the ATP system as well as analyses of stress, mental workload and work hours. Several methods are being used such as interviews, questionnaires, diaries, activity monitoring and videotapes. This paper gives an overview of the project as well as a short summary of the main results. Detailed results are presented in separate reports as started in the reference list. Some of the main results are that the drivers report severe problems concerning sleepiness on early morning shifts, problems with maintenance on vehicles, lack of information supporting the planning task as well as problems in understanding ATP functions. Two groups of drivers having a feed-back related as opposed to a feed-forward driving style could be identified. In conclusion there is a great need to perform more scientific studies of human factors and railway safety as well as to implement safety management programs including professional human factors competence in the railway industries. (orig.)

  11. Renewable fuels: Policy effectiveness and project risk

    International Nuclear Information System (INIS)

    Leach, Andrew; Doucet, Joseph; Nickel, Trevor

    2011-01-01

    This paper examines the impact of government policy on the risk profile of a small ethanol production facility. We derive four key results from a simulation model. First, we show that commodity price risk may discourage investment in a project, despite a positive expected rate of return. Second, we show that political uncertainty may have significant impacts on the risk profile of a project. Next, we show that using only production subsidies to attract investors is expensive, since the financial assistance is paid regardless of whether the plant is operating under positive or negative financial conditions. Finally, we show that a capital grant provides a valuable complement to a subsidy, because the grant reduces the amount of value investors must put at risk, and increases their leverage thereby enhancing returns, while the subsidy mitigates commodity price risk. Our results show that compared to a subsidy-only approach, a grant and subsidy combination provides an investment environment with similar downside protection and expected returns for less than 60% of the cost. Further, we show that the two policy tools combined yield a superior investment environment to that created by an equivalent or greater total investment deployed entirely in either of the policy tools without the other. - Research highlights: → We find that government policy may increase both project returns and risk. → We find a policy of capital grants combined with an output price support to be preferred. → Price supports alone will tend to reward those plants which need them the least.

  12. Diagnostics and results from coaxial plasma gun development for the PLX- α project

    Science.gov (United States)

    Case, A.; Brockington, S.; Cruz, E.; Witherspoon, F. D.

    2016-10-01

    We present results from the diagnostics used during development of the contoured gap coaxial plasma guns for the PLX- α project at LANL. Plasma-jet diagnostics include fast photodiodes for velocimetry, a ballistic pendulum for total plasmoid momentum, and interferometry for line integrated density. Deflectometry will be used for line integrated perpendicular density gradients. Time-resolved high-resolution spectroscopy using a novel detector and time-integrated survey spectroscopy are used for measurements of velocity and temperature, as well as impurities. We will also use a Faraday cup for density, fast imaging for plume geometry, and time-integrated imaging for overall light emission. Experimental results are compared to the desired target parameters for the plasma jets (up to n 2 ×1016cm-3 , v 50km / s , mass 5gm , radius = 4cm , and length 10cm). This work supported by the ARPA-E ALPHA Program.

  13. Results of expert response when forming an exhaustive list of potential risks of constructions projects using energy efficient technologies

    Directory of Open Access Journals (Sweden)

    Ryzhkova Anastasiya Igorevna

    2016-10-01

    Full Text Available The author deals with the most widely used methods of risk events identification. The expert response method is most applicable for construction projects using energy efficient technologies. The article presents the results of an opinion poll of the professional expert community using expert response method, which is aimed to identify the most likely potential “pure” risk of construction projects with energy-efficient technologies in use. 74 experts representing different levels of the construction process were polled: customers and directors of construction companies, project managers, risk managers, advisors. The answers were collected during private talks and also using a special website Survey Monkey. Experts from different countries took part: Russia, Great Britain, Austria, Luxemburg, Switzerland and Norway. Also the article presents the expert evaluation of the “effect” of risk implementation on the cost of a project, implementation time, the product quality, the environment and safety on the construction site.

  14. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  15. The INTRACOIN model comparison project

    International Nuclear Information System (INIS)

    Lawson, G.

    1982-01-01

    The International Nuclide Transport Code Intercomparison (INTRACOIN) project is investigating the different models and associated computer codes describing the transport of radionuclides in flowing ground-water following the disposal of solid radioactive wastes in geologic formations. Level I of the project has shown good agreement in the numerical accuracy of most of the codes. In Level II the ability of the codes to model field experiments with radioactive tracers will be compared. Level III will show to what extent the adoption of different models and computer codes for the transport of radionuclides with ground water affects the results of repository assessments. (U.K.)

  16. New Results from the Geoengineering Model Intercomparison Project (GeoMIP)

    Science.gov (United States)

    Robock, A.; Kravitz, B.

    2013-12-01

    The Geoengineering Model Intercomparison Project (GeoMIP) was designed to determine robust climate system model responses to Solar Radiation Management (SRM). While mitigation (reducing greenhouse gases emissions) is the most effective way of reducing future climate change, SRM (the deliberate modification of incoming solar radiation) has been proposed as a means of temporarily alleviating some of the effects of global warming. For society to make informed decisions as to whether SRM should ever be implemented, information is needed on the benefits, risks, and side effects, and GeoMIP seeks to aid in that endeavor. GeoMIP has organized four standardized climate model simulations involving reduction of insolation or increased amounts of stratospheric sulfate aerosols to counteract increasing greenhouse gases. Thirteen comprehensive atmosphere-ocean general circulation models have participated in the project so far. GeoMIP is a 'CMIP Coordinated Experiment' as part of the Climate Model Intercomparison Project 5 (CMIP5) and has been endorsed by SPARC (Stratosphere-troposphere Processes And their Role in Climate). GeoMIP has held three international workshops and has produced a number of recent journal articles. GeoMIP has found that if increasing greenhouse gases could be counteracted with insolation reduction, the global average temperature could be kept constant, but global average precipitation would reduce, particularly in summer monsoon regions around the world. Temperature changes would also not be uniform. The tropics would cool, but high latitudes would warm, with continuing, but reduced sea ice and ice sheet melting. Temperature extremes would still increase, but not as much as without SRM. If SRM were halted all at once, there would be rapid temperature and precipitation increases at 5-10 times the rates from gradual global warming. SRM combined with CO2 fertilization would have small impacts on rice production in China, but would increase maize production

  17. Research on cross - Project software defect prediction based on transfer learning

    Science.gov (United States)

    Chen, Ya; Ding, Xiaoming

    2018-04-01

    According to the two challenges in the prediction of cross-project software defects, the distribution differences between the source project and the target project dataset and the class imbalance in the dataset, proposing a cross-project software defect prediction method based on transfer learning, named NTrA. Firstly, solving the source project data's class imbalance based on the Augmented Neighborhood Cleaning Algorithm. Secondly, the data gravity method is used to give different weights on the basis of the attribute similarity of source project and target project data. Finally, a defect prediction model is constructed by using Trad boost algorithm. Experiments were conducted using data, come from NASA and SOFTLAB respectively, from a published PROMISE dataset. The results show that the method has achieved good values of recall and F-measure, and achieved good prediction results.

  18. Marketing Industrial Project-Related Services: A Literature Review and Theoretical Synthesis

    DEFF Research Database (Denmark)

    Skaates, Maria Anne; Cova, Bernard

    2002-01-01

    Services are a growing part of projects in the context of the international trend towards solution buying and selling on business-to-business markets. Furthermore services are often a key source of competitive advantage in project business. However companies selling project-related services often...... that specifically deal with project-related services are listed as the result of a study of the English-, French-, German, Italian-, and 'Nordic'-language academic literature. They are then assessed in relation to services versus project marketing theory. The analysis shows that the project marketing concepts...

  19. Instrumentation and monitoring of the nextgen road infrastructure: Some results and perspectives from the R5G project

    Science.gov (United States)

    Hautière, Nicolas; Bourquin, Frédéric

    2017-04-01

    Through the centuries, the roads - which today constitute in France a huge transport network of 1 millions kilometers length - have always been able to cope with society needs and challenges. As a consequence, the next generation road infrastructure will have to take into account at least three societal transitions: ecological, energetic and digital. The goal of the 5th generation road project (R5G©) [1], led by Ifsttar in France, aligned with the Forever Open program [2], is to design and build demonstrators of such future road infrastructures. The goal of this presentation is to present different results related to the greening of road materials [3], the design of energy-positive roads [4, 5], the test of roads that self-diagnose [6], the design of roads adapted for connected [7], autonomous [8] and electrified vehicles [9], etc. In terms of perspectives, we will demonstrate that the road infrastructures will soon become a complex system: On one side road users will benefit from new services, on the other side such massively connected and instrumented infrastructures will potentially become an opportune sensor for knowledge development in geoscience, such as air quality, visibility and fog monitoring. References: [1] R5G project. r5g.ifsttar.fr [2] Forever Open Road project. www.foreveropenroad.eu [3] Biorepavation project. www.infravation.net/projects/BIOREPAVATION [4] N. Le Touz, J. Dumoulin. Numerical study of the thermal behavior of a new deicing road structure design with energy harvesting capabilities. EGU General Assembly 2015, Apr 2015, Vienne, Austria. [5] S. Asfour, F. Bernardin, E. Toussaint, J.-M. Piau. Hydrothermal modeling of porous pavement for its surface de-freezing. Applied Thermal Engineering. Volume 107, 25 August 2016, Pages 493-500 [6] LGV BPL Instrumentation. http://railenium.eu/wp-content/uploads/2016/08/INSTRUMENTATION-BPL-FR.pdf [7] SCOOP@F project. https://ec.europa.eu/inea/en/connecting-europe-facility/cef-transport/projects

  20. Search Results | Page 51 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Showing 501 - 510 of 1761 results : "water adaptation" ... the progress of Tanzania''s Rural Climate Change Adaptation in Africa (CCAA) project ... Despite the availability of funding, there are many challenges limiting access to these monies.

  1. Experimental Results of A1.1 Test for OECD-ATLAS Project

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Kyoung-Ho; Bae, Byoung-Uhn; Park, Yu-Sun; Kim, Jong-Rok; Choi, Nam-Hyun; Choi, Ki-Yong [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    KAERI (Korea Atomic Energy Research Institute) is operating an OECD/NEA project (hereafter, OECD-ATLAS project) by utilizing a thermal-hydraulic integral effect test facility, ATLAS (Advanced Thermal-hydraulic Test Loop for Accident Simulation). Considering the importance of the SBO scenario and the related accident mitigation measures, a prolonged SBO scenario was selected as the first test subject worthy of investigation in the OECD-ATLAS project as summarized in Table 1. After the Fukushima accident, design extension conditions (DECs) such as an SBO and a total loss of feed water (TLOFW) attracted wide international attention in that such high-risk multiple failure accidents should be revisited from the viewpoint of the reinforcement of the 'defense in depth' concept. In particular, an SBO is one of the most important DECs because a total loss of heat sink can lead to a core melt-down scenario under high pressure without any proper operator action. As for a prolonged SBO transient of the OECD-ATLAS project, two tests, named A1.1 and A1.2, were determined to be performed. In most nuclear power plants (NPPs), a turbine-driven auxiliary feedwater system was designed to remove the decay heat during the early period of an SBO transient. From a conservative point of view, however, it is necessary to investigate the thermal-hydraulic behaviors of the NPP when a turbine-driven auxiliary feedwater supply is not available during the initial period of an SBO transient and moreover a mobile pump-driven auxiliary feedwater supply can only become realized in the later period of the scenario. In particular, asymmetric heat removal characteristic through the supply of auxiliary feedwater only to one steam generator has its own peculiar importance in terms of safety analysis code validation. With an aim of considering these safety importance, in the A1.1 test, a prolonged SBO transient was simulated with two temporal phases: Phase (I) for a conservative SBO transient

  2. Project brief of pre-contract in project management

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim; Mohd Azmi Sidid Omar; Abdul Rahman Norazumin; Zakaria Dris; Abdul Murad Abu Bakar; Alwi Othman

    2010-01-01

    Project brief is a comprehensive document used in translating the user needs and requirement for the project implementation. This document is important for the designer as a main guidance towards establishing project details. Research shown that problem usually arises from not well-defined scope and needs by the user. With lack of information the designer tend to assume and interprets wrong translation. Other issues arise from project management are time, cost, budgetary, lack of communication and establishing quality management. Some ideas of improvement were gain by doing cross reference with JKR quality system management, workshop and brainstorming. It shows that an improvement of data collection system has to be integrating with some basic format details, drawings and declaration forms to be established. (author)

  3. Culturally appropriate organization of water and sewerage projects built through public private partnerships.

    Directory of Open Access Journals (Sweden)

    Jessica A Kaminsky

    Full Text Available This paper contributes to the pursuit of socially sustainable water and sanitation infrastructure for all people by discovering statistically robust relationships between Hofstede's dimensions of cross-cultural comparison and the choice of contract award types, project type, and primary revenue sources. This analysis, which represents 973 projects distributed across 24 low- and middle-income nations, uses a World Bank dataset describing high capital cost water and sewerage projects funded through private investment. The results show that cultural dimensions explain variation in the choice of contract award types, project type, and primary revenue sources. These results provide empirical evidence that strategies for water and sewerage project organization are not culturally neutral. The data show, for example, that highly individualistic contexts are more likely to select competitive contract award types and to depend on user fees to provide the primary project revenue stream post-construction. By selecting more locally appropriate ways to organize projects, project stakeholders will be better able to pursue the construction of socially sustainable water and sewerage infrastructure.

  4. Culturally appropriate organization of water and sewerage projects built through public private partnerships.

    Science.gov (United States)

    Kaminsky, Jessica A

    2017-01-01

    This paper contributes to the pursuit of socially sustainable water and sanitation infrastructure for all people by discovering statistically robust relationships between Hofstede's dimensions of cross-cultural comparison and the choice of contract award types, project type, and primary revenue sources. This analysis, which represents 973 projects distributed across 24 low- and middle-income nations, uses a World Bank dataset describing high capital cost water and sewerage projects funded through private investment. The results show that cultural dimensions explain variation in the choice of contract award types, project type, and primary revenue sources. These results provide empirical evidence that strategies for water and sewerage project organization are not culturally neutral. The data show, for example, that highly individualistic contexts are more likely to select competitive contract award types and to depend on user fees to provide the primary project revenue stream post-construction. By selecting more locally appropriate ways to organize projects, project stakeholders will be better able to pursue the construction of socially sustainable water and sewerage infrastructure.

  5. Projective and hybrid projective synchronization for the Lorenz-Stenflo system with estimation of unknown parameters

    International Nuclear Information System (INIS)

    Mukherjee, Payel; Banerjee, Santo

    2010-01-01

    In this work, in the first phase, we study the phenomenon of projective synchronization in the Lorenz-Stenflo system. Synchronization is then investigated for the same system with unknown parameters. We show analytically that synchronization is possible for some proper choice of the nonlinear controller by using a suitable Lyapunov function. With the help of this result, it is also possible to estimate the values of the unknown system parameters. In the second phase as an extension of our analysis, we investigate the new hybrid projective synchronization for the same system. All our analyses are well supported with numerical evidence.

  6. Towards the automotive HMI of the future: Overview of the AIDE - Integrated project results

    NARCIS (Netherlands)

    Amditis, A.; Andreone, L.; Pagle, K.; Markkula, G.; Deregibus, E.; Romera Rue, M.; Bellotti, F.; Engelsberg, A.; Brouwer, R.; Peters, B.; Gloria, A. de

    2010-01-01

    The Adaptive Integrated Driver-vehicle interfacE (AIDE) is an integrated project funded by the European Commission in the Sixth Framework Programme. The project, which involves 31 partners from the European automotive industry and academia, deals with behavioral and technical issues related to

  7. First Results from HOTSPOT: The Snake River Plain Scientific Drilling Project, Idaho, U.S.A.

    Directory of Open Access Journals (Sweden)

    John W. Shervais

    2013-03-01

    Full Text Available HOTSPOT is an international collaborative effort to understand the volcanic history of the Snake River Plain (SRP. The SRP overlies a thermal anomaly, the Yellowstone-Snake River hotspot, that is thought to represent a deep-seated mantle plume under North America. Theprimary goal of this project is to document the volcanic and stratigraphic history of the SRP, which represents the surface expression of this hotspot, and to understand how it affected the evolution of continental crust and mantle. An additional goal is to evaluate the geothermal potential of southern Idaho.Project HOTSPOT has completed three drill holes. (1 The Kimama site is located along the central volcanic axis of the SRP; our goal here was to sample a long-term record of basaltic volcanism in the wake of the SRP hotspot. (2 The Kimberly site is located near the margin of the plain; our goal here was to sample a record of high-temperaturerhyolite volcanism associated with the underlying plume. This site was chosen to form a nominally continuous record of volcanism when paired with the Kimama site. (3 The Mountain Home site is located in the western plain; our goal here was to sample the Pliocene-Pleistocene transition in lake sediments at this site and to sample older basalts that underlie the sediments.We report here on our initial results for each site, and on some of the geophysical logging studies carried out as part of this project.

  8. Search Results | Page 6 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Results 51 - 60 of 420 ... ... why India has the highest percentage of undernourished children in the world. Project. -. Sexual and Domestic Violence: Policy Protocols ... during and after conflicts, shows alarming levels of abuse across the globe.

  9. Search Results | Page 9 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Filter by project status. Active 12 Apply Active filter · Closed 4 Apply Closed filter · Completed 2 Apply Completed filter. Showing 81 - 90 of 96 results : "chagas dengue zika ebola". Research in Action. Gender ...

  10. Search Results | Page 5 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Filter by project status. Active 11 Apply Active filter · Closed 2 Apply Closed filter · Completed 1 Apply Completed filter. Showing 41 - 41 of 41 results : "chagas dengue zika ebola". Story. Health TOBACCO CONTROL TOBACCO ...

  11. Search Results | Page 10 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Filter by project status. Active 12 Apply Active filter · Closed 4 Apply Closed filter · Completed 2 Apply Completed filter. Showing 91 - 96 of 96 results : "chagas dengue zika ebola". Research in Action. Poverty ...

  12. Analyzing Project Management Maturity Level in Indonesia

    Directory of Open Access Journals (Sweden)

    Eliot Simangunsong

    2013-04-01

    Full Text Available Project management has been generally known and increasingly used by many organizations to gain competitive advantage. In this context, many studies have proposed maturity models to evaluate how project management knowledge has been deployed effectively and efficiently in or- ganization. As a developing country, Indonesia needs many development projects managed by government and private companies in different industries. Here, a study to assess project manage- ment maturity level in Indonesian businesses may bring insight about current business practices, which is important to speed up country development and business sustainability. Adapting the Project Management Maturity Model (ProMMM, a survey instrument has been developed and ap- plied to professionals from Jakarta and surrounding area. The result of analysis shows that con- struction and primary industry have a higher maturity level compare to manufacturing and servic- es. It is to be noted, however, that the level of project management understanding is low across in- dustries. This indicates that more quality project management training or certification is required to improve overall project management knowledge in Indonesia.

  13. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  14. Projective geometry and projective metrics

    CERN Document Server

    Busemann, Herbert

    2005-01-01

    The basic results and methods of projective and non-Euclidean geometry are indispensable for the geometer, and this book--different in content, methods, and point of view from traditional texts--attempts to emphasize that fact. Results of special theorems are discussed in detail only when they are needed to develop a feeling for the subject or when they illustrate a general method. On the other hand, an unusual amount of space is devoted to the discussion of the fundamental concepts of distance, motion, area, and perpendicularity.Topics include the projective plane, polarities and conic sectio

  15. [Performance assessment of health services in Catalonia (Spain): evaluation of initial results of the Catalan healthcare service project].

    Science.gov (United States)

    García-Altés, Anna; Dalmau-Bueno, Albert; Colls, Cristina; Mendivil, Joan; Benet, Josep; Mompart, Anna; Torné, Elvira; Zara, Corinne; Borrell, Carme; Brugulat, Pilar; Guarga, Alex

    2009-01-01

    Performance assessment of healthcare services is receiving greater attention due to increasing health care expenditures, greater expectations among the population, and the need to obtain results from the invested resources. Taking advantage of the existing experience of the Agència de Salut Pública de Barcelona and the Consorci Sanitari de Barcelona, which compared the healthcare services of Barcelona and Montreal, a grant from the Agència d'Avaluació de Tecnologia i Recerca Mèdiques, and the health planning interest of the Departament de Salut, the performance assessment of the Catalan healthcare service project was started in Catalonia in 2005. This article aims to present the development of the project, to provide some examples that illustrate the kind of numerical and graphical information that could be obtained and the kind of analysis that could be performed, to provide possible explanations for the results shown, and to discuss some limitations and implications. Currently, the added value of this project is that it identifies the extent to which the healthcare system is achieving its objectives, establishes a set of homogeneous indicators that could be used in the future, and is a key tool in the development of the Central de Resultats del Departament de Salut de la Generalitat de Catalunya.

  16. Might the Rorschach be a projective test after all? Social projection of an undesired trait alters Rorschach Oral Dependency scores.

    Science.gov (United States)

    Bornstein, Robert F

    2007-06-01

    The degree to which projection plays a role in Rorschach (Rorschach, 1921/1942) responding remains controversial, in part because extant data have yielded inconclusive results. In this investigation, I examined the impact of social projection on Rorschach Oral Dependency (ROD) scores using methods adapted from social cognition research. In Study 1, I prescreened 85 college students (40 women and 45 men) with the ROD scale and a widely used self-report measure of dependency, the Interpersonal Dependency Inventory (IDI; Hirschfeld et al., 1977). Results show that informing participants who scored low on the IDI that they were in fact highly dependent led to significant increases in ROD scores; I did not obtain parallel ROD increases for participants who scored high on the IDI or for participants who received low-dependent feedback. In Study 2, I examined a separate sample of 80 prescreened college students (40 women and 40 men) and showed that providing low self-report participants an opportunity to attribute dependency to a fictional target person prior to Rorschach responding attenuated the impact of high-dependent feedback on ROD scores. These results suggest that projection played a role in at least one domain of Rorschach responding. I discuss theoretical, clinical, and empirical implications of these results.

  17. Seabird tissue archival and monitoring project: Egg collections and analytical results 1999-2002

    Science.gov (United States)

    Vander Pol, Stacy S.; Christopher, Steven J.; Roseneau, David G.; Becker, Paul R.; Day, Russel D.; Kucklick, John R.; Pugh, Rebecca S.; Simac, Kristin S.; Weston-York, Geoff

    2003-01-01

    have been developed by STAMP (see York et al. 2001). Eggs are being collected on an annual basis for several species at nesting colonies throughout Alaska. Aliquots of these egg samples are being analyzed on a regular basis for persistent organic pollutants and mercury. Results of this work have been published in scientific journals (Christopher et al. 2002) and in conference proceedings (Kucklick et al. 2002; Vander Pol et al. 2002a, 2002b). The intent of this report is to provide an up-to-date description of STAMP. The report contains the most recent egg collection inventory, analytical data, preliminary interpretations based on these data, and a discussion of possible future directions of the project.

  18. The SAVEMEDCOASTS Project

    Science.gov (United States)

    Anzidei, Marco; Patias, Petros; Forlenza, Giovanna; Trivigno, Maria Lucia; Michetti, Melania; Torresan, Silvia; Loizidou, Xenia; Petousis, Thanos; Doumaz, Fawzi; Lorito, Stefano; Brunori, Carlo Alberto; Pesci, Arianna; Carmisciano, Cosmo

    2017-04-01

    The SAVEMEDCOASTS Project (Sea Level Rise Scenarios along the Mediterranean Coasts), focuses on the Prevention Priority program of the European Commission ECHO A.5 "Civil protection policy, Prevention, Preparedness and Disaster Risk Reduction" and aims to respond to the need for people and assets prevention from natural disasters in Mediterranean coastal areas undergoing to increasing sea level rise and climate change impacts. The goals of the project are: i) to support civil protection at different levels and with different tools and methods to produce exhaustive risk assessments for different periods; ii) to improve governance and raise community awareness towards the impacts of sea level rise and related hazard; iii) to foster the cooperation amongst science, affected communities and civil protection organizations within and between targeted Mediterranean areas. Advanced methods are implied to develop multi-hazard assessments and existing databases for low-lying coastal areas already below or at less than 1 m above sea level, characterized by high economic and environmental value. The effects of sea level rise are assessed by mapping the multi-temporal scenarios of the inland extension of marine flooding and coastline position up to 2100, also temporarily increased during storms or tsunamis. They will result from i) the best available high resolution Digital Terrain Models (DTM); ii) known rates of land subsidence and iii) local sea level rise estimates. Finally, information is transferred to society, policy makers and stakeholders through an open web platform populated with collected information, videos and photo galleries, project results and guidelines. Here we show the strategy and goals of the SAVEMEDCOASTS Project.

  19. What drives continuous improvement project success in healthcare?

    Science.gov (United States)

    Stelson, Paul; Hille, Joshua; Eseonu, Chinweike; Doolen, Toni

    2017-02-13

    Purpose The purpose of this paper is to present findings from a study of factors that affect continuous improvement (CI) project success in hospitals. Design/methodology/approach Quantitative regression analysis was performed on Likert scale survey responses. Qualitative thematic analysis was performed on open-ended survey responses and written reports on CI projects. Findings The paper identifies managerial and employee factors that affect project success. These factors include managerial support, communication, and affective commitment. Affective commitment is the extent to which employees perceive the change as being needed or necessary. Practical implications The results highlight how managerial decisions, approaches to communication - including communication before, during and after CI projects affect project success. The results also show that success depends on the way employees perceive proposed changes. This suggests the need for a more individualized approach to CI, lean, and broader change initiatives. Originality/value This research is the first to fuse project success and sustainability theory to CI projects, beyond Kaizen events, in healthcare environments. The research is particularly important at a time when healthcare organizations are required to make rapid changes with limited resources as they work toward outcome-based assessment and reimbursement rules.

  20. Projective flatness in the quantisation of bosons and fermions

    Science.gov (United States)

    Wu, Siye

    2015-07-01

    We compare the quantisation of linear systems of bosons and fermions. We recall the appearance of projectively flat connection and results on parallel transport in the quantisation of bosons. We then discuss pre-quantisation and quantisation of fermions using the calculus of fermionic variables. We define a natural connection on the bundle of Hilbert spaces and show that it is projectively flat. This identifies, up to a phase, equivalent spinor representations constructed by various polarisations. We introduce the concept of metaplectic correction for fermions and show that the bundle of corrected Hilbert spaces is naturally flat. We then show that the parallel transport in the bundle of Hilbert spaces along a geodesic is a rescaled projection provided that the geodesic lies within the complement of a cut locus. Finally, we study the bundle of Hilbert spaces when there is a symmetry.

  1. Final results of the supra project : Improved Simulation of Upset Recovery

    NARCIS (Netherlands)

    Fucke, L.; Groen, E.; Goman, M.; Abramov, N.; Wentink, M.; Nooij, S.; Zaichik, L.E.; Khrabrov, A.

    2012-01-01

    The objective of the European research project SUPRA (Simulation of Upset Recovery in Aviation) is to develop technologies that eventually contribute to a reduction of risk of Loss of control - in flight (LOC-I) accidents, today's major cause of fatal accidents in commercial aviation. To this end

  2. Project description and crowdfunding success: an exploratory study.

    Science.gov (United States)

    Zhou, Mi Jamie; Lu, Baozhou; Fan, Weiguo Patrick; Wang, G Alan

    2018-01-01

    Existing research on antecedent of funding success mainly focuses on basic project properties such as funding goal, duration, and project category. In this study, we view the process by which project owners raise funds from backers as a persuasion process through project descriptions. Guided by the unimodel theory of persuasion, this study identifies three exemplary antecedents (length, readability, and tone) from the content of project descriptions and two antecedents (past experience and past expertise) from the trustworthy cue of project descriptions. We then investigate their impacts on funding success. Using data collected from Kickstarter, a popular crowdfunding platform, we find that these antecedents are significantly associated with funding success. Empirical results show that the proposed model that incorporated these antecedents can achieve an accuracy of 73 % (70 % in F-measure). The result represents an improvement of roughly 14 percentage points over the baseline model based on informed guessing and 4 percentage points improvement over the mainstream model based on basic project properties (or 44 % improvement of mainstream's performance over informed guessing). The proposed model also has superior true positive and true negative rates. We also investigate the timeliness of project data and find that old project data is gradually becoming less relevant and losing predictive power to newly created projects. Overall, this study provides evidence that antecedents identified from project descriptions have incremental predictive power and can help project owners evaluate and improve the likelihood of funding success.

  3. Response of net ecosystem CO2 exchange and evapotranspiration of boreal forest ecosystems to projected future climate changes: results of a modeling study

    Science.gov (United States)

    Olchev, Alexander; Kurbatova, Julia

    2014-05-01

    It is presented the modeling results describing the possible response of net ecosystem exchange of CO2 (NEE), gross (GPP) and net (NPP) primary production, as well as evapotranspiration (ET) of spruce forest ecosystems situated at central part of European part of Russia at the southern boundary of boreal forest community to projected future changes of climatic conditions and forest species composition. A process-based MixFor-SVAT model (Olchev et al 2002, 2008, 2009) has been used to describe the CO2 and H2O fluxes under present and projected future climate conditions. The main advantage of MixFor-SVAT is its ability not only to describe seasonal and daily dynamics of total CO2 and H2O fluxes at an ecosystem level, but also to adequately estimate the contributions of soil, forest understorey, and various tree species in overstorey into total ecosystem fluxes taking into account their individual responses to changes in environmental conditions as well as the differences in structure and biophysical properties. Results of modeling experiments showed that projected changes of climate conditions (moderate scenario A1B IPCC) and forest species composition at the end of 21 century can lead to small increase of annual evapotranspiration as well as to growth of NEE, GPP and NPP of the forests in case if the projected increase in temperature and elevated CO2 in the atmosphere in future will be strictly balanced with growth of available nutrients and water in plant and soil. It is obvious that any deficit of e.g. nitrogen in leaves (due to reduced transpiration, nitrogen availability in soil, etc.) may lead to decreases in the photosynthesis and respiration rates of trees and, as a consequence, to decreases in the GPP and NEE of entire forest ecosystem. Conducted modeling experiments have demonstrated that a 20% reduction of available nitrogen in tree leaves in a monospesific spruce forest stand may result in a 14% decrease in NEE, a 8% decrease in NPP, and a 4% decrease in

  4. Leading global projects for professional and accidental project leaders

    CERN Document Server

    Moran, Robert T

    2008-01-01

    This book is a must-read for anyone responsible for projects and initiatives that span functional and geographical divides. Authors Moran and Youngdahl bring extensive experience and learning from industry practice to present a clear and straightforward treatment of the leadership skills and knowledge required to lead projects that are global in nature. They have written the first book of its kind to address the three essential skills of global project leaders - strategic project management, project leadership, and cross-cultural leadership. The authors argue that global project leadership is an essential skill in our project-based world and that we are all either intentional or accidental project leaders. Intentional project leaders pursue formal project management education and even certification whereas accidental project leaders find themselves leading global projects and initiatives as a result of a special assignment or promotion. Moran and Youndahl have found that the vast majority of global projects ...

  5. Knowledge management in design teams using a project website

    OpenAIRE

    Otter, den, A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for sharing of knowledge in such teams are hard to change and better systems are difficult to implement for various reasons. Sharing of knowledge in such teams is important for collective understanding of ...

  6. Three-dimensional displacement measurement by fringe projection and speckle photography

    International Nuclear Information System (INIS)

    Barrientos, B.; Garcia-Marquez, J.; Cerca, M.; Hernandez-Bernal, C.

    2008-01-01

    3D displacement fields are measured by the combination of two optical methods, fringe projection and speckle photography. The use of only one camera recording the necessary information implies that no calibration procedures are necessary as is the case in techniques based on stereoscopy. The out-of-plane displacement is measured by fringe projection whereas speckle photography yields the 2-D in-plane component. To show the feasibility of the technique, we analyze a detailed morphological spatio-temporal evolution of a model of the Earth's crust while subjected to compression forces. The results show that the combination of fringe projection and speckle photography is well suited for this type of studies

  7. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project: Terminal Operations HITL 1B Primary Results

    Science.gov (United States)

    Rorie, Conrad; Monk, Kevin; Roberts, Zach; Brandt, Summer

    2018-01-01

    This presentation provides an overview of the primary results from the Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project's second Terminal Operations human-in-the-loop simulation. This talk covers the background of this follow-on experiment, which includes an overview of the first Terminal Operations HITL performed by the project. The primary results include a look at the number and durations of detect and avoid (DAA) alerts issued by the two DAA systems under test. It also includes response time metrics and metrics on the ability of the pilot-in-command (PIC) to maintain sufficient separation. Additional interoperability metrics are included to illustrate how pilots interact with the tower controller. Implications and conclusions are covered at the end.

  8. Study on archive management for nuclear facility decommissioning projects

    International Nuclear Information System (INIS)

    Huang Ling; Gong Jing; Luo Ning; Liao Bing; Zhou Hao

    2011-01-01

    This paper introduces the main features and status of the archive management for nuclear facility decommissioning projects, and explores and discusses the countermeasures in its archive management. Taking the practice of the archive management system of a reactor decommissioning project as an example, the paper illustrates the establishment of archive management system for the nuclear facility decommissioning projects. The results show that the development of a systematic archive management principle and system for nuclear decommissioning projects and the construction of project archives for the whole process from the design to the decommissioning by digitalized archive management system are one effective route to improve the complete, accurate and systematic archiving of project documents, to promote the standardization and effectiveness of the archive management and to ensure the traceability of the nuclear facility decommissioning projects. (authors)

  9. Carbon Accounting and Cost Estimation in Forestry Projects Using CO2Fix V.3

    International Nuclear Information System (INIS)

    Groen, T.; Nabuurs, G.J.; Schelhaas, M.J.

    2006-01-01

    Carbon and financial accounting of projects in the Land Use, Land-Use Change and Forestry sector is a topic of hot debate. Large uncertainty remains concerning the carbon dynamics, the way they should be accounted and the cost efficiency of the projects. Part of the uncertainty can be alleviated by standardisation and transparency of reporting methods. For this reason we further developed CO2FIX, a forest ecosystem carbon model, with modules for carbon and financial accounting. The model is applied to four cases: (1) Joint implementation afforestation project in Romania, (2) Forest management project in Central Europe, (3) Reduced impact logging possibly under the Clean Development Mechanism (CDM) in the future, and (4) Afforestation with native species under the Clean Development Mechanism. The results show the wide applicability of CO2FIX, from degrading grasslands as baseline cases to multiple cohort forest ecosystems. Also the results show that Forest Management in the European case can generate considerable amounts of carbon emission reductions. Further, the results show that although reduced impact logging is not yet an allowed option under the Clean Development Mechanism, it shows promising results in that it is (1) very cost effective, (2) seems to be able to generate intermediate amounts of credits and (3) seems to us as a project type that is not prone to leakage issues. These results are yet another indication to seriously consider reduced impact logging as an eligible measure under the CDM

  10. Search Results | Page 11 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Results 101 - 110 of 292 ... Filter by type .... Strengthening Women Survivors of Violence in Post-Conflict ... Data on sexual violence against women and men, both during and after conflicts, shows alarming levels of abuse across the globe. Project.

  11. Standing on the Shoulders of Giants: Results From the Radiation Oncology Academic Development and Mentorship Assessment Project (ROADMAP)

    International Nuclear Information System (INIS)

    Holliday, Emma B.; Jagsi, Reshma; Thomas, Charles R.; Wilson, Lynn D.; Fuller, Clifton D.

    2014-01-01

    Purpose: To analyze survey information regarding mentorship practices and cross-correlate the results with objective metrics of academic productivity among academic radiation oncologists at US Accreditation Council for Graduate Medical Education (ACGME)-accredited residency training programs. Methods and Materials: An institutional review board-approved survey for the Radiation Oncology Academic Development and Mentorship Assessment Project (ROADMAP) was sent to 1031 radiation oncologists employed at an ACGME-accredited residency training program and administered using an international secure web application designed exclusively to support data capture for research studies. Data collected included demographics, presence of mentorship, and the nature of specific mentoring activities. Productivity metrics, including number of publications, number of citations, h-index, and date of first publication, were collected for each survey respondent from a commercially available online database, and m-index was calculated. Results: A total of 158 academic radiation oncologists completed the survey, 96 of whom reported having an academic/scientific mentor. Faculty with a mentor had higher numbers of publications, citations, and h- and m-indices. Differences in gender and race/ethnicity were not associated with significant differences in mentorship rates, but those with a mentor were more likely to have a PhD degree and were more likely to have more time protected for research. Bivariate fit regression modeling showed a positive correlation between a mentor's h-index and their mentee's h-index (R 2 = 0.16; P<.001). Linear regression also showed significant correlates of higher h-index, in addition to having a mentor (P=.001), included a longer career duration (P<.001) and fewer patients in treatment (P=.02). Conclusions: Mentorship is widely believed to be important to career development and academic productivity. These results emphasize the importance of identifying and

  12. Standing on the Shoulders of Giants: Results From the Radiation Oncology Academic Development and Mentorship Assessment Project (ROADMAP)

    Energy Technology Data Exchange (ETDEWEB)

    Holliday, Emma B. [The University of Texas MD Anderson Cancer Center, Houston, Texas (United States); Jagsi, Reshma [The University of Michigan, Ann Arbor, Michigan (United States); Thomas, Charles R. [Oregon Health Science Center Knight Cancer Institute, Portland, Oregon (United States); Wilson, Lynn D. [Department of Therapeutic Radiology, Yale University School of Medicine, Yale Cancer Center, New Haven, Connecticut (United States); Fuller, Clifton D., E-mail: cdfuller@mdanderson.org [The University of Texas MD Anderson Cancer Center, Houston, Texas (United States); Oregon Health Science Center Knight Cancer Institute, Portland, Oregon (United States)

    2014-01-01

    Purpose: To analyze survey information regarding mentorship practices and cross-correlate the results with objective metrics of academic productivity among academic radiation oncologists at US Accreditation Council for Graduate Medical Education (ACGME)-accredited residency training programs. Methods and Materials: An institutional review board-approved survey for the Radiation Oncology Academic Development and Mentorship Assessment Project (ROADMAP) was sent to 1031 radiation oncologists employed at an ACGME-accredited residency training program and administered using an international secure web application designed exclusively to support data capture for research studies. Data collected included demographics, presence of mentorship, and the nature of specific mentoring activities. Productivity metrics, including number of publications, number of citations, h-index, and date of first publication, were collected for each survey respondent from a commercially available online database, and m-index was calculated. Results: A total of 158 academic radiation oncologists completed the survey, 96 of whom reported having an academic/scientific mentor. Faculty with a mentor had higher numbers of publications, citations, and h- and m-indices. Differences in gender and race/ethnicity were not associated with significant differences in mentorship rates, but those with a mentor were more likely to have a PhD degree and were more likely to have more time protected for research. Bivariate fit regression modeling showed a positive correlation between a mentor's h-index and their mentee's h-index (R{sup 2} = 0.16; P<.001). Linear regression also showed significant correlates of higher h-index, in addition to having a mentor (P=.001), included a longer career duration (P<.001) and fewer patients in treatment (P=.02). Conclusions: Mentorship is widely believed to be important to career development and academic productivity. These results emphasize the importance of

  13. Results of a project on development of agro-forestry systems for food security in Carrefour region, Republic of Haiti

    Directory of Open Access Journals (Sweden)

    Furio Massolino

    2011-11-01

    Full Text Available Haity has a notable problem of food security, 48% of people have not sufficient food availability, food prices has doubled from 1980 and 1990 and further increased 5 times between 1991 and 2000. Water availability and quality is another problems to be added to food insufficiency. Food deficiency is mitigated by natural food resources in rural areas where many different species are cultivated together but it can be extreme in the towns. Agricultural systems are not efficient and, at the same time, enhance soil and genetic erosion. A development project has been implemented to increase food security over the long term in the geographical area of Carrefour rural area, this comprises a research aimed to increase national food production introducing complex agro-forestry systems. The project has investigated problems and solutions, actions have been started to increase food production, including agronomic training of local farmers, organization of small farmers including legal protection on land tenure, introduction of low input modern agroforestry systems that can diversify food production through the year and reduce soil and genetic erosion. After these results, an intervention project has been approved and funded by EU, then delayed due to the recent civil war, finally it is giving positive results now. The same approach used for this project can be spread in the rest of the Republic of Haiti and, hopefully, to other world regions that have similar problems.

  14. Associated factors to self-rated health among hypertensive and/or diabetic elderly: results from Bambuí project

    Directory of Open Access Journals (Sweden)

    Antônio Ignácio de Loyola Filho

    2013-09-01

    Full Text Available Objective: This study investigated the associated factors with negative self-rated health among hypertensive and/or diabetic elderly. Methods: All the participants of Bambuí Project elderly cohort who suffered from hypertension and/or diabetes and who answered the questionnaire without the help of a close informant were selected for this (n = 942. Covariates encompassed sociodemographic characteristics, social support, health behaviors, health status and use of health services. Results: Negative self-rated health showed positively associated with dissatisfaction with social relations (PR = 1.98, 95%CI 1.42 - 2.76, attendance at religious services less than once a month (PR = 1.96, 95%CI 1.44 - 2.68; be smokers (PR = 1.64, 95%CI 1.24 - 2.17, presence of arthritis (PR = 1.35, 95%CI 1.07 - 1.71, depressive symptoms (PR = 1.81, 95%CI 1.37 - 2.39 and insomnia (PR = 1.37, 95%CI 1.06 - 1.78, having consulted the doctor two or more times in the last twelve months (PR = 2.18; 95%CI 1.14 - 4.19 and PR = 3.96; 95%CI 2.10 - 7.48, respectively for "2 - 3" and "4+" visits, and have hypertension and diabetes (compared to the isolated presence of hypertension Conclusions: Our results confirmed the multidimensional nature of self-rated health and were consistent with that observed in other national and international studies.

  15. Deposition, persistence and turnover of pollutants: first results from the EU project AquaTerra for selected river basins and aquifers

    DEFF Research Database (Denmark)

    Barth, J.A.C.; Steidle, D.; Kuntz, D.

    2007-01-01

    in laboratory studies with soils and aquifer material from selected sites. For sediment transport of contaminants, new flood sampling techniques revealed highest deposition rates of beta-hexachlorocyclohexane (beta-HCH) in river sediments at hotspot areas on the Mulde River in the Bitterfeld region (Elbe Basin...... that range from biogeochemistry, environmental engineering, computer modelling and chemistry to socio-economic sciences. Field study areas are the river basins of the Ebro, the Meuse, the Elbe and the Danube as well as the 3-km(2) French catchment of the Brevilles Spring. Within the first 2 years...... of the project more than 1700 samples of atmospherically deposited particles, sediments, and water have been collected in the above-mentioned systems. Results show clear spatial patterns of deposition of polyaromatic hydrocarbons (PAHs) with the highest rates in the Meuse Basin. For local inputs...

  16. Conditions, factors and criteria for successful project implementation: generalization of experience of project management

    Directory of Open Access Journals (Sweden)

    Feraru Galina Sergeevna

    2014-11-01

    Full Text Available The article addresses issues characterizing features of project management contributing to their competitive advantage; shows the factors and criteria of success of projects and the main reasons for their failures, making the failed efforts of developers to create projects.

  17. Equitable Financial Evaluation Method for Public-Private Partnership Projects

    Institute of Scientific and Technical Information of China (English)

    KE Yongjian; LIU Xinping; WANG Shouqing

    2008-01-01

    The feasibility study of a public-private partnership (PPP) project is regarded as one of the critical factors for successful implementation,but unfortunately the common financial evaluation methods currently used only represent the benefits of the private sector.There is,therefore,an urgent need to develop an equitable financial evaluation method for PPP projects.This paper presents a comprehensive literature review that examines international practices.An equitable financial evaluation method was then developed taking into account the inherent characteristics of PPP projects using six separate indicators and Monte Carlo simulations.The result for a bridge project in Romania shows that the method combines the viewpoints of all the relevant stakeholders to achieve an equitable financial evaluation of PPP projects.

  18. Rock On! Band Together to Fight Hunger: Results from a Food Insecurity Awareness Project

    Science.gov (United States)

    Tallant, April

    2011-01-01

    The purpose of this research was to evaluate a service-learning project conducted at a public university in the southern United States of America. A sample of 46 undergraduates enrolled in two sections of a liberal studies personal nutrition seminar course participated in a food insecurity awareness project. The service-learning component entailed…

  19. Fiscal 1999 research result report on energy and environment technology demonstration research support project (International joint demonstration research project). Japan- Russia joint demonstration research on large-capacity long- distant DC power transmission technology; 1999 nendo daiyoryo denryoku no chokyori chokuryu soden gijutsu ni kansuru Russia kenkyu kikan tono kyodo jissho kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Under the assumption of a large-capacity DC power transmission model project in the Far East and Siberia districts, technical study was made on the basic design of the project, considering selection of concrete power generation and consumption sites and power transmission routes, power transmission/transformation equipment, cables, and environmental impact. Study was also made on its applicability to similar projects in Japan. The model project aims at integration of Eastern Integrated Power System in the Far East and Russian Unified Power System, and development of abundant undeveloped hydraulic and tidal power generation in the Far East. The study result showed that (1) construction of the high-voltage DC power transmission (HVDC) system of model project class voltage and capacity in Eastern Siberia is possible technically enough, (2) the total construction cost of the model project scheduled to be put into operation in 2025 amounts to nearly $4.7 billion, and (3) the model project is environment-friendly without any CO{sub 2} gas emission because of hydraulic and tidal power generation. (NEDO)

  20. Selection of projects in the regional energy planning

    International Nuclear Information System (INIS)

    Ramirez P, R.; Navas M, F.

    1993-01-01

    The processes of regional energy planning have changed vastly in the last years and it will continue changing in the future for the new norm of the State. This work tries to show the use of systematic tools in the selection of regional energy projects. It discusses a methodology of selection of projects based on a multivariate technical. It is applied in the Southwestern region of Colombia and both selection and priority results are obtained. The designed methodology allows to make the selection of projects in an automatic way with a software designed for such an end. In the case of Southwestern it arrives to a briefcase of projects for an energy plan and made for other races

  1. The Rectal Cancer Project of the Spanish Association of Surgeons

    Directory of Open Access Journals (Sweden)

    H. Ortiz Hurtado

    2017-04-01

    Conclusions: This project shows that the results obtained in Scandinavia have been reproduced in a larger population in Spain applying a similar methodology focused on the spread of competence and auditing of results.

  2. Freedom Project

    Directory of Open Access Journals (Sweden)

    Alejandra Suarez

    2014-02-01

    Full Text Available Freedom Project trains prisoners in nonviolent communication and meditation. Two complementary studies of its effects are reported in this article. The first study is correlational; we found decreased recidivism rates among prisoners trained by Freedom Project compared with recidivism rates in Washington state. The second study compared trained prisoners with a matched-pair control group and found improvement in self-reported anger, self-compassion, and certain forms of mindfulness among the trained group. Ratings of role-plays simulating difficult interactions show increased social skills among the group trained by Freedom Project than in the matched controls.

  3. New Inspiring Planetarium Show Introduces ALMA to the Public

    Science.gov (United States)

    2009-03-01

    As part of a wide range of education and public outreach activities for the International Year of Astronomy 2009 (IYA2009), ESO, together with the Association of French Language Planetariums (APLF), has produced a 30-minute planetarium show, In Search of our Cosmic Origins. It is centred on the global ground-based astronomical Atacama Large Millimeter/submillimeter Array (ALMA) project and represents a unique chance for planetariums to be associated with the IYA2009. ESO PR Photo 09a/09 Logo of the ALMA Planetarium Show ESO PR Photo 09b/09 Galileo's first observations with a telescope ESO PR Photo 09c/09 The ALMA Observatory ESO PR Photo 09d/09 The Milky Way band ESO PR Video 09a/09 Trailer in English ALMA is the leading telescope for observing the cool Universe -- the relic radiation of the Big Bang, and the molecular gas and dust that constitute the building blocks of stars, planetary systems, galaxies and life itself. It is currently being built in the extremely arid environment of the Chajnantor plateau, at 5000 metres altitude in the Chilean Andes, and will start scientific observations around 2011. ALMA, the largest current astronomical project, is a revolutionary telescope, comprising a state-of-the-art array of 66 giant 12-metre and 7-metre diameter antennas observing at millimetre and submillimetre wavelengths. In Search of our Cosmic Origins highlights the unprecedented window on the Universe that this facility will open for astronomers. "The show gives viewers a fascinating tour of the highest observatory on Earth, and takes them from there out into our Milky Way, and beyond," says Douglas Pierce-Price, the ALMA Public Information Officer at ESO. Edited by world fulldome experts Mirage3D, the emphasis of the new planetarium show is on the incomparable scientific adventure of the ALMA project. A young female astronomer guides the audience through a story that includes unique animations and footage, leading the viewer from the first observations by Galileo

  4. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    Science.gov (United States)

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  5. Annual report 2011. Results and activities

    International Nuclear Information System (INIS)

    2012-01-01

    Enova is a state-owned enterprise, owned by the Norwegian Ministry of Petroleum and Energy. Over a period of ten years, the enterprise has worked to trigger energy efficiency measures and renewable energy production by supporting proactive players that have paved the way for others. In the period 2002-2011, Enova has contracted an energy result of 16.6 TWh, Enova's Annual Report 2011 shows. This corresponds to the annual energy end-use of more than 35 per cent of Norways 2.2 million private households. Enova has allocated NOK 9 billion in support over ten years. This has resulted in project owners and other financiers investing about Nok 45 billion in capital for environmentally friendly energy projects in Norway, says Nils Kristian Nakstad, CEO of Enova. In 2011, Enova supported projects with an overall energy result of 1.35 TWh using resources from the Energy Fund, equally distributed between energy efficiency and renewable heating. The greatest contributors in 2011 are within energy conversion to renewable heating and energy efficiency measures in buildings.The climate impact of all of the projects where Enova has entered into contracts corresponds to 9.3 million tonnes in reduced CO2 emissions annually. The latter constitutes 17 per cent of domestic greenhouse gas emissions. (au)

  6. Annual report 2011. Results and activities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-07-25

    Enova is a state-owned enterprise, owned by the Norwegian Ministry of Petroleum and Energy. Over a period of ten years, the enterprise has worked to trigger energy efficiency measures and renewable energy production by supporting proactive players that have paved the way for others. In the period 2002-2011, Enova has contracted an energy result of 16.6 TWh, Enova's Annual Report 2011 shows. This corresponds to the annual energy end-use of more than 35 per cent of Norways 2.2 million private households. Enova has allocated NOK 9 billion in support over ten years. This has resulted in project owners and other financiers investing about Nok 45 billion in capital for environmentally friendly energy projects in Norway, says Nils Kristian Nakstad, CEO of Enova. In 2011, Enova supported projects with an overall energy result of 1.35 TWh using resources from the Energy Fund, equally distributed between energy efficiency and renewable heating. The greatest contributors in 2011 are within energy conversion to renewable heating and energy efficiency measures in buildings.The climate impact of all of the projects where Enova has entered into contracts corresponds to 9.3 million tonnes in reduced CO2 emissions annually. The latter constitutes 17 per cent of domestic greenhouse gas emissions. (au)

  7. 'Show me the money': energy projects financing

    International Nuclear Information System (INIS)

    Ball, C.

    2006-01-01

    This paper describes the business and business model of Corpfinance International (CFI). CFI consists of three businesses: structured financing, private equity/corporate finance advisory and securitization. Furthermore, CFI is the lender of record acting on behalf of and based on strong relationship with various Life Insurance Companies, Pension Funds and International Banks. CFI has in-house expertise in support of its lending advisory and investing activities

  8. Search Results | Page 18 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Filter by project status. Closed 288 Apply Closed filter · Active 70 Apply Active filter · Completed 11 Apply Completed filter. Showing 171 - 180 of 875 results. Papers. BRAZIL INTERNATIONAL NEGOTIATIONS GREENHOUSE EFFECT EMISSION CONTROL AGRICULTURAL PRODUCTIVITY Climate change ARGENTINA ...

  9. Preliminary results of BRAVO project: brain computer interfaces for Robotic enhanced Action in Visuo-motOr tasks.

    Science.gov (United States)

    Bergamasco, Massimo; Frisoli, Antonio; Fontana, Marco; Loconsole, Claudio; Leonardis, Daniele; Troncossi, Marco; Foumashi, Mohammad Mozaffari; Parenti-Castelli, Vincenzo

    2011-01-01

    This paper presents the preliminary results of the project BRAVO (Brain computer interfaces for Robotic enhanced Action in Visuo-motOr tasks). The objective of this project is to define a new approach to the development of assistive and rehabilitative robots for motor impaired users to perform complex visuomotor tasks that require a sequence of reaches, grasps and manipulations of objects. BRAVO aims at developing new robotic interfaces and HW/SW architectures for rehabilitation and regain/restoration of motor function in patients with upper limb sensorimotor impairment through extensive rehabilitation therapy and active assistance in the execution of Activities of Daily Living. The final system developed within this project will include a robotic arm exoskeleton and a hand orthosis that will be integrated together for providing force assistance. The main novelty that BRAVO introduces is the control of the robotic assistive device through the active prediction of intention/action. The system will actually integrate the information about the movement carried out by the user with a prediction of the performed action through an interpretation of current gaze of the user (measured through eye-tracking), brain activation (measured through BCI) and force sensor measurements. © 2011 IEEE

  10. Mathematics authentic assessment on statistics learning: the case for student mini projects

    Science.gov (United States)

    Fauziah, D.; Mardiyana; Saputro, D. R. S.

    2018-03-01

    Mathematics authentic assessment is a form of meaningful measurement of student learning outcomes for the sphere of attitude, skill and knowledge in mathematics. The construction of attitude, skill and knowledge achieved through the fulfilment of tasks which involve active and creative role of the students. One type of authentic assessment is student mini projects, started from planning, data collecting, organizing, processing, analysing and presenting the data. The purpose of this research is to learn the process of using authentic assessments on statistics learning which is conducted by teachers and to discuss specifically the use of mini projects to improving students’ learning in the school of Surakarta. This research is an action research, where the data collected through the results of the assessments rubric of student mini projects. The result of data analysis shows that the average score of rubric of student mini projects result is 82 with 96% classical completeness. This study shows that the application of authentic assessment can improve students’ mathematics learning outcomes. Findings showed that teachers and students participate actively during teaching and learning process, both inside and outside of the school. Student mini projects also provide opportunities to interact with other people in the real context while collecting information and giving presentation to the community. Additionally, students are able to exceed more on the process of statistics learning using authentic assessment.

  11. Inflated Uncertainty in Multimodel-Based Regional Climate Projections

    Science.gov (United States)

    Madsen, Marianne Sloth; Langen, Peter L.; Boberg, Fredrik; Christensen, Jens Hesselbjerg

    2017-11-01

    Multimodel ensembles are widely analyzed to estimate the range of future regional climate change projections. For an ensemble of climate models, the result is often portrayed by showing maps of the geographical distribution of the multimodel mean results and associated uncertainties represented by model spread at the grid point scale. Here we use a set of CMIP5 models to show that presenting statistics this way results in an overestimation of the projected range leading to physically implausible patterns of change on global but also on regional scales. We point out that similar inconsistencies occur in impact analyses relying on multimodel information extracted using statistics at the regional scale, for example, when a subset of CMIP models is selected to represent regional model spread. Consequently, the risk of unwanted impacts may be overestimated at larger scales as climate change impacts will never be realized as the worst (or best) case everywhere.

  12. Anthropogenic radioactivity in the Arctic Ocean. Review of the results from the joint German project

    International Nuclear Information System (INIS)

    Nies, H.; Harms, I.H.; Karcher, M.J.; Dethleff, D.; Bahe, C.

    1999-01-01

    The paper presents the results of the joint project carried out in Germany in order to assess the consequences in the marine environment from the dumping of nuclear wastes in the Kara and Barents Seas. The project consisted of experimental work on measurements of radionuclides in samples from the Arctic marine environment and numerical modelling of the potential pathways and dispersion of contaminants in the Arctic Ocean. Water and sediment samples were collected for determination of radionuclide such as 137Cs, 90Sr, 239+240Pu, 238Pu, and 241Am and various organic micropollutants. In addition, a few water and numerous surface sediment samples collected in the Kara Sea and from the Kola peninsula were taken by Russian colleagues and analysed for artificial radionuclides by the BSH laboratory. The role of transport by sea ice from the Kara Sea into the Arctic Ocean was assessed by a small subgroup at GEOMAR. This transport process might be considered as a rapid contribution due to entrainment of contaminated sediments into sea ice, following export from the Kara Sea into the transpolar ice drift and subsequent release in the Atlantic Ocean in the area of the East Greenland Current. Numerical modelling of dispersion of pollutants from the Kara and Barents Seas was carried out both on a local scale for the Barents and Kara Seas and for long range dispersion into the Arctic and Atlantic Oceans. Three-dimensional baroclinic circulation models were applied to trace the transport of pollutants. Experimental results were used to validate the model results such as the discharges from the nuclear reprocessing plant at Sellafield and subsequent contamination of the North Sea up the Arctic Seas

  13. Anthropogenic radioactivity in the Arctic Ocean--review of the results from the joint German project.

    Science.gov (United States)

    Nies, H; Harms, I H; Karcher, M J; Dethleff, D; Bahe, C

    1999-09-30

    The paper presents the results of the joint project carried out in Germany in order to assess the consequences in the marine environment from the dumping of nuclear wastes in the Kara and Barents Seas. The project consisted of experimental work on measurements of radionuclides in samples from the Arctic marine environment and numerical modelling of the potential pathways and dispersion of contaminants in the Arctic Ocean. Water and sediment samples were collected for determination of radionuclide such as 137Cs, 90Sr, 239 + 240Pu, 238Pu, and 241Am and various organic micropollutants. In addition, a few water and numerous surface sediment samples collected in the Kara Sea and from the Kola peninsula were taken by Russian colleagues and analysed for artificial radionuclide by the BSH laboratory. The role of transport by sea ice from the Kara Sea into the Arctic Ocean was assessed by a small subgroup at GEOMAR. This transport process might be considered as a rapid contribution due to entrainment of contaminated sediments into sea ice, following export from the Kara Sea into the transpolar ice drift and subsequent release in the Atlantic Ocean in the area of the East Greenland Current. Numerical modelling of dispersion of pollutants from the Kara and Barents Seas was carried out both on a local scale for the Barents and Kara Seas and for long range dispersion into the Arctic and Atlantic Oceans. Three-dimensional baroclinic circulation models were applied to trace the transport of pollutants. Experimental results were used to validate the model results such as the discharges from the nuclear reprocessing plant at Sellafield and subsequent contamination of the North Sea up the Arctic Seas.

  14. ATES Smart Grids research project overview and first results

    Science.gov (United States)

    Bloemendal, Martin; Jaxa-Rozen, Marc; Rostampour, Vahab

    2016-04-01

    Background: ATES is application is growing Application of seasonal Aquifer Thermal Energy Storage (ATES) contributes to energy saving and Greenhouse Gas (GHG)-reduction goals (CBS, 2015; EU, 2010, 2014). Recently it was shown that ATES is applicable in several parts of the world (Bloemendal et al., 2015). While in most parts of the world adoption is just beginning, in the Netherlands progressive building energy efficiency regulation already caused the adoption of ATES to take off (Heekeren and Bakema, 2015; Sommer et al., 2015). As a result of the large number of ATES systems in the Netherlands, the subsurface plays a crucial role in the energy saving objectives of The Netherlands (Kamp, 2015; SER, 2013). Problem: suboptimal use of the subsurface for energy storage ATES systems accumulate in urban areas, as can be expected with a large growth of ATES systems; at many locations in Dutch cities demand for ATES transcends the available space in the subsurface (Li, 2014; Sommer et al., 2015). Within in the Dutch legal framework and state of technology optimal use of the subsurface is not secured; i.e. minimizing the total GHG emissions in a certain area. (Bloemendal et al., 2014; Li, 2014). The most important aspects in this problem are A) the permanent and often unused claim resulting from static permits and B) excessive safety zones around wells to prevent interaction. Both aspects result in an artificial reduction of subsurface space for potential new ATES systems. Recent research has shown that ground energy storage systems could be placed much closer to each other (Bakr et al., 2013; Sommer et al., 2015), and a controlled/limited degree of interaction between them can actually benefit the overall energy savings of an entire area. Solution: the approach and first results of our research project on ATES Smart Grids The heating and cooling demand of buildings is a dynamic and hard to predict process, due to effects such as weather, climate change, changing function

  15. MORE: Management of requirements in NPP modernisation projects. Project report 2007

    International Nuclear Information System (INIS)

    Fredriksen, R.; Katta, V.; Raspotnig, C.; Valkonen, J.

    2008-03-01

    This report documents the work and related activities of the MORE project in the period January 1 - December 31 in 2007. The focus of this report is on improvements of the former project results, to identify and apply a couple of case studies from NPP projects, and activities in order to initiate and implement the industrial take-up and utilisation of the research results in real modernisation projects. The report also provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  16. MORE: Management of requirements in NPP modernisation projects. Project report 2007

    Energy Technology Data Exchange (ETDEWEB)

    Fredriksen, R.; Katta, V.; Raspotnig, C. [Institutt for energiteknikk (IFE) (Norway); Valkonen, J. [Technical Research Centre of Finland (VTT) (Finland)

    2008-03-15

    This report documents the work and related activities of the MORE project in the period January 1 - December 31 in 2007. The focus of this report is on improvements of the former project results, to identify and apply a couple of case studies from NPP projects, and activities in order to initiate and implement the industrial take-up and utilisation of the research results in real modernisation projects. The report also provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  17. MEditerranean Supersite Volcanoes (MED-SUV) project: from objectives to results

    Science.gov (United States)

    Puglisi, Giuseppe; Spampinato, Letizia

    2017-04-01

    The MEditerranean Supersite Volcanoes (MED-SUV) was a FP7 3-year lasting project aimed at improving the assessment of volcanic hazards at two of the most active European volcanic areas - Campi Flegrei/Vesuvius and Mt. Etna. More than 3 million people are exposed to potential hazards in the two areas, and the geographic location of the volcanoes increases the number of people extending the impact to a wider region. MED-SUV worked on the (1) optimisation and integration of the existing and new monitoring systems, (2) understanding of volcanic processes, and on the (3) relationship between the scientific and end-user communities. MED-SUV fully exploited the unique multidisciplinary long-term in-situ datasets available for these volcanoes and integrated them with Earth observations. Technological developments and implemented algorithms allowed better constraint of pre-, sin- and post-eruptive phases. The wide range of styles and intensities of the volcanic phenomena observed at the targeted volcanoes - archetypes of 'closed' and 'open' conduit systems - observed by using the long-term multidisciplinary datasets, exceptionally upgraded the understanding of a variety of geo-hazards. Proper experiments and studies were carried out to advance the understanding of the volcanoes' internal structure and processes, and to recognise signals related to impending unrest/eruptive phases. Indeed, the hazard quantitative assessment benefitted from the outcomes of these studies and from their integration with cutting edge monitoring approaches, thus leading to step-changes in hazard awareness and preparedness, and leveraging the close relationship between scientists, SMEs, and end-users. Among the MED-SUV achievements, we can list the (i) implementation of a data policy compliant with the GEO Open Data Principles for ruling the exploitation and shared use of the project outcomes; (ii) MED-SUV e-infrastructure creation as test bed for designing an interoperable infrastructure to

  18. Use of thermodynamic sorption models to derive radionuclide Kd values for performance assessment: Selected results and recommendations of the NEA sorption project

    Science.gov (United States)

    Ochs, M.; Davis, J.A.; Olin, M.; Payne, T.E.; Tweed, C.J.; Askarieh, M.M.; Altmann, S.

    2006-01-01

    For the safe final disposal and/or long-term storage of radioactive wastes, deep or near-surface underground repositories are being considered world-wide. A central safety feature is the prevention, or sufficient retardation, of radionuclide (RN) migration to the biosphere. To this end, radionuclide sorption is one of the most important processes. Decreasing the uncertainty in radionuclide sorption may contribute significantly to reducing the overall uncertainty of a performance assessment (PA). For PA, sorption is typically characterised by distribution coefficients (Kd values). The conditional nature of Kd requires different estimates of this parameter for each set of geochemical conditions of potential relevance in a RN's migration pathway. As it is not feasible to measure sorption for every set of conditions, the derivation of Kd for PA must rely on data derived from representative model systems. As a result, uncertainty in Kd is largely caused by the need to derive values for conditions not explicitly addressed in experiments. The recently concluded NEA Sorption Project [1] showed that thermodynamic sorption models (TSMs) are uniquely suited to derive K d as a function of conditions, because they allow a direct coupling of sorption with variable solution chemistry and mineralogy in a thermodynamic framework. The results of the project enable assessment of the suitability of various TSM approaches for PA-relevant applications as well as of the potential and limitations of TSMs to model RN sorption in complex systems. ?? by Oldenbourg Wissenschaftsverlag.

  19. The IAHR project CCHE-Climate Change impact on the Hydrological cycle, water management and Engineering: an overview and preliminary results

    Science.gov (United States)

    Ranzi, Roberto; Kojiri, T.; Mynett, A.; Barontini, S.; van de Giesen, N.; Kolokytha, E.; Ngo, L. A.; Oreamuno, R.; Renard, B.; Sighomnou, D.; Vizina, A.

    2010-05-01

    IAHR, the International Association for Hydro-Environment Engineering and Research launched a research Project called Climate Change impact on the Hydrological cycle, water management and Engineering (IAHR CCHE Project). It was motivated by the fact that, although it is now well accepted that, in the light of the recent IPCC reports the vast majority of members of the scientific community are convinced that the climate is changing or at least will experience a significant fluctuation already during the current century, it is perceived that some hydrologists, water experts and hydraulic engineers are not yet ready to incorporate climate change scenarios in their designs for such projects as: - flood protection and river training, - dam rehabilitation, - water resources management under water scarcity and changes in the hydrological regimes. The objective of the project is to encourage a close co-operation between the scientific and engineering communities in taking appropriate and timely action in response to the impact of climate change on the hydrological regime and on water resource projects. The project aims at reporting on (a) the current state of knowledge as regards the impact of projected climate change on the hydrological regime in different regions of the world, where these regions are defined not just in geographic terms but also on the basis of their level of economic and water resources development; (b) the extent to which these impacts are recognized and taken into account by national water authorities, engineering organizations and other regulating bodies in setting their standard practices and procedures for the planning, design and operation of water works. These adaptation measures will include both "hard" responses, such as the construction or enlargement of engineering structures, and "soft" responses, such as changes in legislation or the operating rules of existing structures. An overview of the project and preliminary results extracted from of

  20. The global unified parallel file system (GUPFS) project: FY 2003 activities and results

    Energy Technology Data Exchange (ETDEWEB)

    Butler, Gregory F.; Baird William P.; Lee, Rei C.; Tull, Craig E.; Welcome, Michael L.; Whitney Cary L.

    2004-04-30

    The Global Unified Parallel File System (GUPFS) project is a multiple-phase project at the National Energy Research Scientific Computing (NERSC) Center whose goal is to provide a scalable, high-performance, high-bandwidth, shared file system for all of the NERSC production computing and support systems. The primary purpose of the GUPFS project is to make the scientific users more productive as they conduct advanced scientific research at NERSC by simplifying the scientists' data management tasks and maximizing storage and data availability. This is to be accomplished through the use of a shared file system providing a unified file namespace, operating on consolidated shared storage that is accessible by all the NERSC production computing and support systems. In order to successfully deploy a scalable high-performance shared file system with consolidated disk storage, three major emerging technologies must be brought together: (1) shared/cluster file systems software, (2) cost-effective, high-performance storage area network (SAN) fabrics, and (3) high-performance storage devices. Although they are evolving rapidly, these emerging technologies individually are not targeted towards the needs of scientific high-performance computing (HPC). The GUPFS project is in the process of assessing these emerging technologies to determine the best combination of solutions for a center-wide shared file system, to encourage the development of these technologies in directions needed for HPC, particularly at NERSC, and to then put them into service. With the development of an evaluation methodology and benchmark suites, and with the updating of the GUPFS testbed system, the project did a substantial number of investigations and evaluations during FY 2003. The investigations and evaluations involved many vendors and products. From our evaluation of these products, we have found that most vendors and many of the products are more focused on the commercial market. Most vendors

  1. Genetic Determinants of Thrombin Generation and Their Relation to Venous Thrombosis: Results from the GAIT-2 Project

    Science.gov (United States)

    Martin-Fernandez, Laura; Ziyatdinov, Andrey; Carrasco, Marina; Millon, Juan Antonio; Martinez-Perez, Angel; Vilalta, Noelia; Brunel, Helena; Font, Montserrat; Hamsten, Anders; Souto, Juan Carlos; Soria, José Manuel

    2016-01-01

    Background Venous thromboembolism (VTE) is a common disease where known genetic risk factors explain only a small portion of the genetic variance. Then, the analysis of intermediate phenotypes, such as thrombin generation assay, can be used to identify novel genetic risk factors that contribute to VTE. Objectives To investigate the genetic basis of distinct quantitative phenotypes of thrombin generation and its relationship to the risk of VTE. Patients/Methods Lag time, thrombin peak and endogenous thrombin potential (ETP) were measured in the families of the Genetic Analysis of Idiopathic Thrombophilia 2 (GAIT-2) Project. This sample consisted of 935 individuals in 35 extended families selected through a proband with idiopathic thrombophilia. We performed also genome wide association studies (GWAS) with thrombin generation phenotypes. Results The results showed that 67% of the variation in the risk of VTE is attributable to genetic factors. The heritabilities of lag time, thrombin peak and ETP were 49%, 54% and 52%, respectively. More importantly, we demonstrated also the existence of positive genetic correlations between thrombin peak or ETP and the risk of VTE. Moreover, the major genetic determinant of thrombin generation was the F2 gene. However, other suggestive signals were observed. Conclusions The thrombin generation phenotypes are strongly genetically determined. The thrombin peak and ETP are significantly genetically correlated with the risk of VTE. In addition, F2 was identified as a major determinant of thrombin generation. We reported suggestive signals that might increase our knowledge to explain the variability of this important phenotype. Validation and functional studies are required to confirm GWAS results. PMID:26784699

  2. Financing Preference Behaviour for Private Finance Initiative (PFI Projects

    Directory of Open Access Journals (Sweden)

    Yati Md Lasa

    2016-01-01

    Full Text Available Project Financing Initiative (PFI projects require the private sector to invest an enormous amount of capital for the development of public projects. The private sector has to seek cost-effective financing sources for their survival in the long-term concession. Conventional financing uses widely; however, Islamic financing promises better financing through profit and loss sharing. This paper reviews financing preferences for PFI projects and the factors influencing the choice of funding. The results show that religious perspective, quality of services, financing facilities and reputation are the factors that are expected will influence the financing preference behaviour, either Islamic or conventional finance.

  3. Advertising Citizen Science: A Trailer for the Citizen Sky Project

    Science.gov (United States)

    Wyatt, Ryan; Price, A.

    2012-01-01

    Citizen Sky is a multi-year, NSF funded citizen science project involving the bright and mysterious variable star epsilon Aurigae. The project was conceived by the IYA 2009 working group on Research Experiences for Students, Teachers, and Citizen-Scientists. Citizen Sky goes beyond simple observing to include a major data analysis component, introducing participants to the full scientific process from background research to paper writing for a peer-reviewed journal. As a means of generating interest in the project, the California Academy of Sciences produced a six-minute "trailer” formatted for both traditional and fulldome planetariums as well as HD and web applications. This talk will review the production process for the trailer as well as the methods of distribution via planetariums, social media, and other venues_along with an update on the Citizen Sky Project as a whole. We will show how to use a small, professionally-produced planetarium trailer to help spread word on a citizen science project. We will also show preliminary results on a study about how participation level/type in the project affects science learning.

  4. Space Synthetic Biology Project

    Science.gov (United States)

    Howard, David; Roman, Monsi; Mansell, James (Matt)

    2015-01-01

    project in selecting the best approaches to the application of bioelectrochemical technologies to ECLS. Figure 1 shows results of simulation of charge transport in an experimental system. Figure 2 shows one of five conceptual designs for ECLS subsystems based on bioelectrochemical reactors. Also during the first 2 years, some work was undertaken to gather fundamental data (conductivities, overpotentials) relevant to the modeling efforts.

  5. Status and results from the decay spectroscopy project EURICA (Euroball-RIKEN cluster array)

    Energy Technology Data Exchange (ETDEWEB)

    Söderström, P.-A., E-mail: pasoder@ribf.riken.jp; Doornenbal, P.; Nishimura, S.; Baba, H.; Isobe, T.; Kiss, G. [RIKEN Nishina Center, 2-1 Hirosawa, Wako-shi, Saitama 351-0198 (Japan); Lorusso, G. [RIKEN Nishina Center, 2-1 Hirosawa, Wako-shi, Saitama 351-0198 (Japan); National Physical Laboratory, Teddington, Middlesex, TW11 0LW (United Kingdom); Wu, J. [RIKEN Nishina Center, 2-1 Hirosawa, Wako-shi, Saitama 351-0198 (Japan); School of Physics, Peking University, Beijing 100871 (China); Xu, Z. Y. [Department of Physics, University of Tokyo, Hongo, Bunkyo-ku, Tokyo 113-0033 (Japan); KU Leuven, Instituut voor Kern-en Stralingsfysica, 3001 Leuven (Belgium); Benzoni, G. [Istituto Nazionale di Fisica Nucleare, Sezione di Milano, Via Celoria 16, 20133 Milano (Italy); Browne, F. [RIKEN Nishina Center, 2-1 Hirosawa, Wako-shi, Saitama 351-0198 (Japan); School of Computing, Engineering and Mathematics, University of Brighton, Brighton BN2 4JG (United Kingdom); Gey, G. [RIKEN Nishina Center, 2-1 Hirosawa, Wako-shi, Saitama 351-0198 (Japan); LPSC, Université Grenoble-Alpes, CNRS/IN2P3, F-38026 Grenoble Cedex (France); ILL, 38042 Grenoble Cedex (France); Research Center for Nuclear Physics (RCNP), Osaka University, Ibaraki, Osaka 567-0047 (Japan); Jungclaus, A. [Instituto de Estructura de la Materia, CSIC, E-28006 Madrid (Spain); Kojouharov, I.; Kurz, N.; Schaffner, H. [GSI Helmholtzzentrum für Schwerionenforschung GmbH, 64291 Darmstadt (Germany); Lubos, D. [RIKEN Nishina Center, 2-1 Hirosawa, Wako-shi, Saitama 351-0198 (Japan); Physik Department E12, Technische Universität München, D-85748 Garching (Germany); Moschner, K. [RIKEN Nishina Center, 2-1 Hirosawa, Wako-shi, Saitama 351-0198 (Japan); IKP, University of Cologne, D-50937 Cologne (Germany); and others

    2016-07-07

    β- and isomer-decay spectroscopy are sensitive probes of nuclear structure, and are often the only techniques capable of providing data for exotic nuclei that are produced with very low rates. Decay properties of exotic nuclei are also essential to model astrophysical events responsible for the evolution of the universe such as the rp- and r-processes. The EURICA project (EUROBALL RIKEN Cluster Array) has been launched in 2012 with the goal of performing spectroscopy of very exotic nuclei. Since 2012, five experimental campaigns have been successfully completed using fragmentation of {sup 124}Xe beam and in-flight-fission of {sup 238}U beam. In these proceedings we will introduce the experimental setup and highlight some key recent results around {sup 78}Ni, {sup 132}Sn, and {sup 110}Zn published during 2014 and 2015.

  6. Surveying the Alentejo continental shelf for minerals and Quaternary environmental changes: preliminary results of the MINEPLAT project survey

    Science.gov (United States)

    Noiva, João; Ribeiro, Carlos; Terrinha, Pedro; Brito, Pedro; Neres, Marta

    2017-04-01

    The tectonic uplift of South Portugal in the last 5 Million years (My) was firstly identified on the basis of morphologic criteria by Mariano Feio (1952, "The evolution of the relief of Baixo Alentejo and Algarve", transl.). However, the assessment of continental vertical movements off Portugal and its relation with tectonics was only initiated in the 1990-ies. This work was carried out in the framework of FP6 and FP7 in the domains of Natural Hazards funded by the European Community. The swath bathymetry cartography of the southwest part of the Iberian Peninsula resulted from the effort of European and national projects, of 19 oceanographic surveys, a total of 200 ship time days executed from 2000 to 2006, involving 14 research institutions from 7 European countries. As a result of this effort together with acquisition and interpretation of thousands of km of seismic reflection profiles, the Pliocene-Quaternary uplift of the Alentejo continental margin (SW Portugal) is now widely accepted by the scientific community. This uplift has not been yet quantified but it is possible that can have contributed to erosion and deposition of metallic ores as placers in the continental shelf. This argues in favor of the potential existence of placers in the continental shelf and the need for the detailed investigation that will allow determination of ideal location for placers deposition in the past Pliocene-Quaternary (5 My). The source for metals can arguably be associated to the Iberian Pyrite Belt ores hosted in the Alentejo Paleozoic formations and to the hyper-alkaline intrusions of Sines and Monchique of Late Cretaceous age. Artificial renourishment of beaches with offshore sand has not been assessed for the Alentejo littoral, despite that the coast located to the south of the Sines segment shows high susceptibility to erosion. This has been observed on a regular basis as the beaches are frequently devoid of sand, thus jeopardizing their touristic potential. The detailed

  7. Cost-effectiveness of intensified versus conventional multifactorial intervention in type 2 diabetes: results and projections from the Steno-2 study

    DEFF Research Database (Denmark)

    Gaede, Peter; Valentine, William J; Palmer, Andrew J

    2008-01-01

    and account Danish-specific costs to project life expectancy, quality-adjusted life expectancy (QALE), and lifetime direct medical costs expressed in year 2005 Euros. Clinical and cost outcomes were projected over patient lifetimes and discounted at 3% annually. Sensitivity analyses were performed. RESULTS...... gained. This is considered a conservative estimate because accounting prescription of generic drugs and capturing indirect costs would further favor intensified therapy. CONCLUSIONS: From a health care payer perspective in Denmark, intensive therapy was more cost-effective than conventional treatment...

  8. Business Cases for Major Public Infrastructure Projects in Canada

    Directory of Open Access Journals (Sweden)

    Mario Iacobacci

    2017-11-01

    Full Text Available When governments announce that they are going to spend vast sums of taxpayers’ money on a new public infrastructure project, you can be certain they will praise all the terrific new benefits that the project will bring to citizens, making everyone’s life easier, safer, greener and better. But this does not tell us whether we are better off as a society, after accounting for the cost of these projects borne by taxpayers today and well into the future. In reality, there is a meaningful risk that a project undertaken without a proper business case could end up making citizens’ lives worse. That new commuter train might look sleek and shiny and seem convenient for some, but a close business case analysis of recent transit projects in Canada’s three largest cities suggests that in as many as four cases out of 21 projects, the burden of paying for the projects does not justify the public investment. In a review of thirteen recent public transit projects in the Greater Toronto and Hamilton Area (GTHA, at least three projects had benefits that fell short of the costs. Yet, all three projects went ahead (or have been funded. Only one project showed large net benefits for citizens once all considerations were accounted for. Three projects showed small net benefits – of a size that can be easily offset by a modest cost over-run. The six remaining projects did not have any publicly available business cases. In the Greater Montreal area, a review of three recent major transit projects turned up no evidence of a publicly available business case for any of them. As a result, Montrealers are in the dark as to how much benefit or value destruction the three projects are responsible for. Things are far more encouraging in Vancouver, however, where three out of the five major transit projects undertaken or funded in recent years were backed by business cases showing a net benefit. Only one project did not show a net benefit and one project did not have a

  9. NASA/DOD Aerospace Knowledge Diffusion Research Project. Report 15: Technical uncertainty and project complexity as correlates of information use by US industry-affiliated aerospace engineers and scientists: Results of an exploratory investigation

    Science.gov (United States)

    Pinelli, Thomas E.; Glassman, Nanci A.; Affelder, Linda O.; Hecht, Laura M.; Kennedy, John M.; Barclay, Rebecca O.

    1993-01-01

    An exploratory study was conducted that investigated the influence of technical uncertainty and project complexity on information use by U.S. industry-affiliated aerospace engineers and scientists. The study utilized survey research in the form of a self-administered mail questionnaire. U.S. aerospace engineers and scientists on the Society of Automotive Engineers (SAE) mailing list served as the study population. The adjusted response rate was 67 percent. The survey instrument is appendix C to this report. Statistically significant relationships were found to exist between technical uncertainty, project complexity, and information use. Statistically significant relationships were found to exist between technical uncertainty, project complexity, and the use of federally funded aerospace R&D. The results of this investigation are relevant to researchers investigating information-seeking behavior of aerospace engineers. They are also relevant to R&D managers and policy planners concerned with transferring the results of federally funded aerospace R&D to the U.S. aerospace industry.

  10. Managing IT Projects in Public Companies: A Case Study

    Directory of Open Access Journals (Sweden)

    Bouras, A.

    2014-07-01

    Full Text Available As part of its public sector modernization effort, a North African government has put a lot of effort and allocated significant budgets since 1997 to modernize one of its main public sector companies. Consequently, this company, that mainly offers postal services, initiated many IT-based projects to computerize all paper-based ongoing services offered through its branches and to present new products to customers. This company was aiming to improve service quality and to diversify the range of its services. However, some of these IT-based projects inevitably faced problems. Some projects were either not completed successfully, cancelled, over-budget or taking more time than scheduled. As a result, many employees and customers of this company were dissatisfied and complained about bad planning, slowness and significant disruptions in these projects, an event that affected adversely the quality of service. This study aims at determining the causes of these project disruptions, failures or delays. To achieve this aim, 30 experienced project developers and engineers working in that company’s IT department volunteered to respond to a detailed questionnaire specifically developed for this purpose. The questionnaire included questions about project vision clarity, time/cost management, project quality assurance, risk management and human resources management. Results show that the main reasons for disruptions, failure or delays in IT projects are lack of business plan and poor documentation during and after finishing projects, lack of clear quality assurance criteria, standards and reviews, and poor project risk management practices. Ramifications of such results in terms of improving IT project management practices in the public service sector are finally presented.

  11. The international hydrocoin project

    International Nuclear Information System (INIS)

    1988-01-01

    The international co-operation project HYDROCOIN for studying groundwater flow modelling in the context of radioactive waste disposal was initiated in 1984. Thirteen organizations from ten countries and two international organizations participate in the project which is managed by the Swedish Nuclear Power Inspectorate SKI. This report summarizes the results from the first phase of HYDROCOIN. Level 1, which has been devoted to verification of 29 computer programs for groundwater hydrology. This has been done by applying the codes to seven hypothetical test cases representing different physical situations. For linear test cases, the agreement between results calculated with different codes has been satisfactory for primarily calculated entities (groundwater pressure, salt concentration and temperatures). Results for properties derived from gradients of the primary field (groundwater velocity and trajectories) show agreement to a lesser extent. Furthermore, HYDROCOIN Level 1 illustrates problems related to solving strongly non-linear cases, such as coupled flow and brine transport. HYDROCOIN Level 1 has provided an efficient means for testing strengths and weaknesses of various strategies for groundwater flow modelling and post processing. As a result of the Level 1 effort, several code enhancements have been made

  12. Real options and volume uncertainty by field development projects

    International Nuclear Information System (INIS)

    Ekern, S.; Stensland, G.

    1993-12-01

    The report concerns a study on the use of option methodology in field development projects. The report shows how the value of flexibility in the different decision processes is to be found by means of real option methodology. Particular attention is laid on the uncertainty concerning the volume of reserves and production capacity. The results from the study were based on the research project dubbed ''Use of real options in field development projects''. The project is partially connected to another project dubbed ''Decisive behaviour and alternative action under uncertainty in the petroleum sector''. Main topics cover as follow: Example with volume uncertainty; real options and volume uncertainty; gradual disclosure of uncertainty in the production; value of flexible production equipment. 33 refs., 19 figs., 17 tabs

  13. Designing Summer Research Experiences for Teachers and Students That Promote Classroom Science Inquiry Projects and Produce Research Results

    Science.gov (United States)

    George, L. A.; Parra, J.; Rao, M.; Offerman, L.

    2007-12-01

    Research experiences for science teachers are an important mechanism for increasing classroom teachers' science content knowledge and facility with "real world" research processes. We have developed and implemented a summer scientific research and education workshop model for high school teachers and students which promotes classroom science inquiry projects and produces important research results supporting our overarching scientific agenda. The summer training includes development of a scientific research framework, design and implementation of preliminary studies, extensive field research and training in and access to instruments, measurement techniques and statistical tools. The development and writing of scientific papers is used to reinforce the scientific research process. Using these skills, participants collaborate with scientists to produce research quality data and analysis. Following the summer experience, teachers report increased incorporation of research inquiry in their classrooms and student participation in science fair projects. This workshop format was developed for an NSF Biocomplexity Research program focused on the interaction of urban climates, air quality and human response and can be easily adapted for other scientific research projects.

  14. Development of Visualizations and Loggable Activities for the Geosciences. Results from Recent TUES Sponsored Projects

    Science.gov (United States)

    De Paor, D. G.; Bailey, J. E.; Whitmeyer, S. J.

    2012-12-01

    Our TUES research centers on the role of digital data, visualizations, animations, and simulations in undergraduate geoscience education. Digital hardware (smartphones, tablets, GPSs, GigaPan robotic camera mounts, etc.) are revolutionizing field data collection. Software products (GIS, 3-D scanning and modeling programs, virtual globes, etc.) have truly transformed the way geoscientists teach, learn, and do research. Whilst Google-Earth-style visualizations are famously user-friend for the person browsing, they can be notoriously unfriendly for the content creator. Therefore, we developed tools to help educators create and share visualizations as easily as if posting on Facebook. Anyone whoIf you wish to display geological cross sections on Google Earth, go to digitalplanet.org, upload image files, position them on a line of section, and share with the world through our KMZ hosting service. Other tools facilitate screen overlay and 3-D map symbol generation. We advocate use of such technology to enable undergraduate students to 'publish' their first mapping efforts even while they are working in the field. A second outcome of our TUES projects merges Second-Life-style interaction with Google Earth. We created games in which students act as first responders for natural hazard mitigation, prospectors for natural resource explorations, and structural geologist for map-making. Students are represented by avatars and collaborate by exchange of text messages - the natural mode of communication for the current generation. Teachers view logs showing student movements as well as transcripts of text messages and can scaffold student learning and geofence students to prevent wandering. Early results of in-class testing show positive learning outcomes. The third aspect of our program emphasizes dissemination. Experience shows that great effort is required to overcome activation energy and ensure adoption of new technology into the curriculum. We organized a GSA Penrose

  15. Variance in parametric images: direct estimation from parametric projections

    International Nuclear Information System (INIS)

    Maguire, R.P.; Leenders, K.L.; Spyrou, N.M.

    2000-01-01

    Recent work has shown that it is possible to apply linear kinetic models to dynamic projection data in PET in order to calculate parameter projections. These can subsequently be back-projected to form parametric images - maps of parameters of physiological interest. Critical to the application of these maps, to test for significant changes between normal and pathophysiology, is an assessment of the statistical uncertainty. In this context, parametric images also include simple integral images from, e.g., [O-15]-water used to calculate statistical parametric maps (SPMs). This paper revisits the concept of parameter projections and presents a more general formulation of the parameter projection derivation as well as a method to estimate parameter variance in projection space, showing which analysis methods (models) can be used. Using simulated pharmacokinetic image data we show that a method based on an analysis in projection space inherently calculates the mathematically rigorous pixel variance. This results in an estimation which is as accurate as either estimating variance in image space during model fitting, or estimation by comparison across sets of parametric images - as might be done between individuals in a group pharmacokinetic PET study. The method based on projections has, however, a higher computational efficiency, and is also shown to be more precise, as reflected in smooth variance distribution images when compared to the other methods. (author)

  16. From Project Management to Process Management - Effectively Organising Transdisciplinary Projects

    OpenAIRE

    Moschitz, Heidrun

    2013-01-01

    In transdisciplinary projects, the roles of researchers change. In addition to being a source of knowledge, they are required to engage in knowledge exchange processes. This results in an alteration at project level: researchers need to creatively manage projects as group processes.

  17. Employment impacts of CDM projects in China's power sector

    International Nuclear Information System (INIS)

    Wang, Can; Zhang, Weishi; Cai, Wenjia; Xie, Xi

    2013-01-01

    There are continuous debates around the question of whether CDM really contributes to sustainable development (SD) in host countries. Employment impact is an essential indicator of SD. Based on an input-out approach this research builds a quantitative assessment model to evaluate the employment impacts of CDM. Both direct and indirect jobs creation and job losses of CDM projects in the power sector registered by the end of 2011 are calculated by project types and power grids where the project is located. Results of this study show that, although the above mentioned CDM projects causes about 99,000 net direct job losses, they also create about 3.08 million indirect jobs, resulting in the gross employment of CDM to be about 2.98 million. Thereof, hydro projects induce both direct and indirect job losses, which comes to approximately 0.89 million. Solar projects have the most potential since they own the highest indirect jobs created by one GWh generation, about 104 jobs/GWh. - Highlights: • An input–output model was built for assessment of CDM projects' employment impact; • CDM projects create direct and indirect jobs while cause some losses in short. • Significant indirect job gains of CDM projects were found; • Solar projects cause 104 jobs/GWh in average, ranking as the highest contributor

  18. Education and guidance to the civil protection culture: insights and first results from the SicuraMente project

    Science.gov (United States)

    Romeo, Saverio; Benvenuti, Eugenio; Calabrese, Danilo; Galluccio, Dario Giuseppe; Tocci, Mauro

    2017-04-01

    training hours were carried out. The first results, obtained through questionnaires and online tests allowing the continuous monitoring of the learning process, confirmed that the main goals are achieved: it is recorded a general increase of the safety awareness on students and people around them. The present project is under the Patronage of the Civil Protection of Regione Umbria and the Association of Italian Municipalities and it is co-financed by the Italian Civil Protection Department. In addition, in order to ensure a high quality standard on the project contents, the main national research centers such as the National Institute of Geophysics and Volcanology and the Research Institute for Geo-Hydrological Protection (National Research Council) are involved. The next step of the SicuraMente project will be the increase of the total number of stakeholders (institutions and students) by involving new schools and universities at national level.

  19. Non-commutative residue of projections in Boutet de Monvel's calculus

    DEFF Research Database (Denmark)

    Gaarde, Anders

    2007-01-01

    Using results by Melo, Nest, Schick, and Schrohe on the K-theory of Boutet de Monvel's calculus of boundary value problems, we show that the non-commutative residue introduced by Fedosov, Golse, Leichtnam, and Schrohe vanishes on projections in the calculus. This partially answers a question raised...... in a recent collaboration with Grubb, namely whether the residue is zero on sectorial projections for boundary value problems: This is confirmed to be true when the sectorial projections is in the calculus....

  20. NPD project portfolio selection using reinvestment strategy in competitive environment

    Directory of Open Access Journals (Sweden)

    Alireza Ghassemi

    2018-01-01

    Full Text Available This study aims to design a new model for selecting most fitting new product development projects in a pool of projects. To catch the best model, we assume new products will be introduced to the competitive markets. Also, we suppose the revenue yielded by completed projects can be reinvested on implementation of other projects. Other sources of financing are borrowing loans from banks and initial capital of the firm. These limited resources determine most evaluated projects to be performed. Several types of interactions among different projects are considered to make the chosen projects more like a portfolio. In addition, some numerical examples from the real world are provided to demonstrate the applicability of the proposed model. These examples show how the particular considerations in the suggested model affect the results.

  1. FY 1980 Report on results of research and development project, commissioned by Sunshine Project. Researches on R and D of management procedures; 1980 nendo kenkyu kaihatsu kanri shuho no kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-03-01

    The strategic system planning procedures have been developed and applied for drafting R and D targets and subsequent medium-term plans, in order to help promote the Sunshine Project smoothly, based on the long-term prospects. This project compares the developed procedures with the current promotion systems and R and D management supporting procedures, to establish the strategic system planning procedures. These newly developed procedures are expected to accelerate the Sunshine Project, when applied in the standard manner. They are also partly applied to coal liquefaction techniques for (system demand analysis), the results of which are used to propose the ideal R and D targets of these techniques. The milestone planning procedures are preliminary applied to (establishing the project plans), to draw systematic long-, medium- and short-term plans. The preliminary application of these prediction/analysis and supporting procedures has verified effectiveness of the strategic system planning procedures. (NEDO)

  2. Project Solaris, a Global Network of Autonomous Observatories: Design, Commissioning, and First Science Results

    Science.gov (United States)

    Kozłowski, S. K.; Sybilski, P. W.; Konacki, M.; Pawłaszek, R. K.; Ratajczak, M.; Hełminiak, K. G.; Litwicki, M.

    2017-10-01

    We present the design and commissioning of Project Solaris, a global network of autonomous observatories. Solaris is a Polish scientific undertaking aimed at the detection and characterization of circumbinary exoplanets and eclipsing binary stars. To accomplish this, a network of four fully autonomous observatories has been deployed in the Southern Hemisphere: Solaris-1 and Solaris-2 in the South African Astronomical Observatory in South Africa; Solaris-3 in Siding Spring Observatory in Australia; and Solaris-4 in Complejo Astronomico El Leoncito in Argentina. The four stations are nearly identical and are equipped with 0.5-m Ritchey-Crétien (f/15) or Cassegrain (f/9, Solaris-3) optics and high-grade 2 K × 2 K CCD cameras with Johnson and Sloan filter sets. We present the design and implementation of low-level security; data logging and notification systems; weather monitoring components; all-sky vision system, surveillance system; and distributed temperature and humidity sensors. We describe dedicated grounding and lighting protection system design and robust fiber data transfer interfaces in electrically demanding conditions. We discuss the outcomes of our design, as well as the resulting software engineering requirements. We describe our system’s engineering approach to achieve the required level of autonomy, the architecture of the custom high-level industry-grade software that has been designed and implemented specifically for the use of the network. We present the actual status of the project and first photometric results; these include data and models of already studied systems for benchmarking purposes (Wasp-4b, Wasp-64b, and Wasp-98b transits, PG 1663-018, an eclipsing binary with a pulsator) as well J024946-3825.6, an interesting low-mass binary system for which a complete model is provided for the first time.

  3. Final Results from A Pilot Project to Investigate Wake Vortex Patterns and Weather Patterns at the Atlantic City Airport by the Richard Stockton College of NJ and the FAA

    Science.gov (United States)

    Trout, Joseph; Manson, J. Russell; King, David; Decicco, Nicolas; Prince, Alyssa; di Mercurio, Alexis; Rios, Manual

    2017-01-01

    Wake Vortex Turbulence is the turbulence generated by an aircraft in flight. This turbulence is created by vortices at the tips of the wing that may decay slowly and persist for several minutes after creation. These vortices and turbulence are hazardous to other aircraft in the vicinity. The strength, formation and lifetime of the turbulence and vortices are effected by many things including the weather. Here we present the final results of the pilot project to investigation of low level wind fields generated by the Weather Research and Forecasting Model and an analysis of historical data. The findings from the historical data and the data simulations were used as inputs for the computational fluid dynamics model (OpenFoam) to show that the vortices could be simulated using OpenFoam. Presented here are the updated results from a research grant, ``A Pilot Project to Investigate Wake Vortex Patterns and Weather Patterns at the Atlantic City Airport by the Stockton University and the FAA''.

  4. Projector primary-based optimization for superimposed projection mappings

    Science.gov (United States)

    Ahmed, Bilal; Lee, Jong Hun; Lee, Yong Yi; Lee, Kwan H.

    2018-01-01

    Recently, many researchers have focused on fully overlapping projections for three-dimensional (3-D) projection mapping systems but reproducing a high-quality appearance using this technology still remains a challenge. On top of existing color compensation-based methods, much effort is still required to faithfully reproduce an appearance that is free from artifacts, colorimetric inconsistencies, and inappropriate illuminance over the 3-D projection surface. According to our observation, this is due to the fact that overlapping projections are treated as an additive-linear mixture of color. However, this is not the case according to our elaborated observations. We propose a method that enables us to use high-quality appearance data that are measured from original objects and regenerate the same appearance by projecting optimized images using multiple projectors, ensuring that the projection-rendered results look visually close to the real object. We prepare our target appearances by photographing original objects. Then, using calibrated projector-camera pairs, we compensate for missing geometric correspondences to make our method robust against noise. The heart of our method is a target appearance-driven adaptive sampling of the projection surface followed by a representation of overlapping projections in terms of the projector-primary response. This gives off projector-primary weights to facilitate blending and the system is applied with constraints. These samples are used to populate a light transport-based system. Then, the system is solved minimizing the error to get the projection images in a noise-free manner by utilizing intersample overlaps. We ensure that we make the best utilization of available hardware resources to recreate projection mapped appearances that look as close to the original object as possible. Our experimental results show compelling results in terms of visual similarity and colorimetric error.

  5. Increasing Prediction the Original Final Year Project of Student Using Genetic Algorithm

    Science.gov (United States)

    Saragih, Rijois Iboy Erwin; Turnip, Mardi; Sitanggang, Delima; Aritonang, Mendarissan; Harianja, Eva

    2018-04-01

    Final year project is very important forgraduation study of a student. Unfortunately, many students are not seriouslydidtheir final projects. Many of studentsask for someone to do it for them. In this paper, an application of genetic algorithms to predict the original final year project of a studentis proposed. In the simulation, the data of the final project for the last 5 years is collected. The genetic algorithm has several operators namely population, selection, crossover, and mutation. The result suggest that genetic algorithm can do better prediction than other comparable model. Experimental results of predicting showed that 70% was more accurate than the previous researched.

  6. Integrating a Procurement Management Process into Critical Chain Project Management (CCPM: A Case-Study on Oil and Gas Projects, the Piping Process

    Directory of Open Access Journals (Sweden)

    Sung-Hwan Jo

    2018-05-01

    Full Text Available Engineering, Procurement, and Construction (EPC of oil and gas megaprojects often experience cost overruns due to substantial schedule delays. One of the greatest causes of these overruns is the mismanagement of the project schedule, with the piping works (prefabrication and installation occupying a majority of that schedule. As such, an effective methodology for scheduling, planning, and controlling of piping activities is essential for project success. To meet this need, this study used the Critical Chain Project Management (CCPM to develop a piping construction delay prevention methodology, incorporating material procurement processes for EPC megaprojects. Recent studies indicate that the traditional scheduling method used on oil and gas mega projects has critical limitations regarding resource scarcity, calculation of activity duration, and dealing with uncertainties. To overcome these limitations, the Theory of Constraints-based CCPM was proposed and implemented to provide schedule buffers management. Nonexistent in literature, and of critical importance, is this paper’s focus on the resource buffer, representing material uncertainty and management. Furthermore, this paper presents a step-by-step process and flow chart for project, construction, and material managers to effectively manage a resource buffer through the CCPM process. This study extends the knowledge of traditional resource buffers in CCPM to improve material and procurement management, thus avoiding the shortage of piping materials and minimizing delays. The resultant process was validated by both deterministic and probabilistic schedule analysis through two case studies of a crude pump unit and propylene compressor installation at a Middle Eastern Refinery Plant Installation. The results show that the CCPM method effectively handles uncertainty, reducing the duration of piping works construction by about a 35% when compared to the traditional method. Furthermore, the

  7. 4-H & FFA Livestock Projects: Life Skills Gained and Knowledge Learned

    Directory of Open Access Journals (Sweden)

    Lyle N. Holmgren

    2007-06-01

    Full Text Available Junior Livestock shows are one of the most popular 4-H and FFA projects in Utah. Thousands of youth participate in these shows from every county in Utah. County extension agents and FFA advisors spend much time with livestock committees, leaders, parents, and youth engaged in livestock shows. Can public funds spent on salaries be justified for county 4-H extension agents and FFA advisors who work with junior livestock shows? To help answer this question, 413 youth involved in livestock shows in Utah were surveyed in 2001. Youth were asked to share skills learned from their livestock projects. Value statements along with specific content skills were measured in the survey. The results indicate that from their 4-H and FFA projects, youth learned to accept responsibility, follow instructions, gain self-confidence, follow instructions, “do the right thing” as well as a variety of other values and content skills.

  8. Final report on the Background Soil Characterization Project at the Oak Ridge Reservation, Oak Ridge, Tennessee. Volume 1: Results of Field Sampling Program

    Energy Technology Data Exchange (ETDEWEB)

    Watkins, D.R.; Ammons, J.T.; Branson, J.L. [and others

    1993-10-01

    This report presents, evaluates, and documents data and results obtained in the Background Soil Characterization Project (BSCP). It is intended to be a stand-alone document for application and use in structuring and conducting remedial investigation and remedial action projects in the Environmental Restoration (ER) Program. The objectives of the BSCP consist of the following: determine background concentrations of organics, metals, and radionuclides in natural soils that are key to environmental restoration projects; provide remediation projects with 100% validated data on background concentrations, which are technically and legally defensible; and quantify baseline risks from background constituents for comparison of risks associated with contaminated sites.

  9. Cooperative project for energy-oriented modernisation of industrial buildings - coordination results; Projektverbund zur energiegerechten Sanierung industriell errichteter Gebaeude - Ergebnisse der Koordination

    Energy Technology Data Exchange (ETDEWEB)

    Kerschberger, A. [Assmann Beraten und Planen GmbH, Stuttgart (Germany)

    1997-12-31

    The cooperative project concept of the federal ministry of science and technology is discussed. Coordination activities as well as pilot projects and comparative projects are described. Results obtained so far are reported in detail; heat energy conservation potentials as substantiated by means of measurements are shown in tabulated form. Further indicated in tabulated form are the redevelopment costs per residential unit, the payback period of the entire project, and a comparison of reduced heating costs with increased basic rent for apportioning the costs of modernization. (MSK) [Deutsch] Die Konzeption des Projektverbundes des BMBF wird naeher erlaeutert. Die Aktivitaeten der Koordination und die Versuchs-und Vergleichsbauvorhaben werden beschrieben. Die bisherigen Ergebnisse werden detailliert geschildert und die mess

  10. Private Water Projects

    OpenAIRE

    Izaguirre, Ada Karina; Hunt, Catherine

    2005-01-01

    Drawing on the World Bank's Private Participation in Infrastructure Project Database, this Note reviews developments in the water and sewerage sector of developing countries in 2004 and changes in private participation in the sector since 2001. Data for 2004 show that total investment in water and sewerage projects with private participation amounted to nearly US$2 billion. Recent private ...

  11. Fast image matching algorithm based on projection characteristics

    Science.gov (United States)

    Zhou, Lijuan; Yue, Xiaobo; Zhou, Lijun

    2011-06-01

    Based on analyzing the traditional template matching algorithm, this paper identified the key factors restricting the speed of matching and put forward a brand new fast matching algorithm based on projection. Projecting the grayscale image, this algorithm converts the two-dimensional information of the image into one-dimensional one, and then matches and identifies through one-dimensional correlation, meanwhile, because of normalization has been done, when the image brightness or signal amplitude increasing in proportion, it could also perform correct matching. Experimental results show that the projection characteristics based image registration method proposed in this article could greatly improve the matching speed, which ensuring the matching accuracy as well.

  12. Quality of the restricted variation after projection method with angular momentum projection

    International Nuclear Information System (INIS)

    Rodriguez, Tomas R.; Egido, J.L.; Robledo, L.M.; Rodriguez-Guzman, R.

    2005-01-01

    Recently, the restricted angular momentum variation after projection method, using the quadrupole degree of freedom as a variational coordinate in conjunction with effective interactions of the Skyrme or Gogny type, has been used very successfully to study a variety of phenomena concerning the quadrupole degree of freedom. In this paper, we study the quality of such an approach by considering additional degrees of freedom as variational coordinates: the hexadecapole moment and the fluctuations on the quadrupole moment, particle number, and angular momentum operators. The study has been performed with the Gogny interaction (D1S parametrization) for the nuclei 32 Mg and 34 Mg. The results of the angular momentum projection and the subsequent generator coordinate calculations show that the extra degrees of freedom considered are irrelevant for the description of the lowest lying states for each angular momentum

  13. Assessing the influence of project management on quality during the early phases of construction projects

    Directory of Open Access Journals (Sweden)

    Ljevo Žanesa

    2018-12-01

    Full Text Available Although the quality of a process affects the quality of the end product, there is currently an insignif­icant amount of knowledge about the quality of project management (PM processes that directly affect the quality of the delivered product (constructed building. This study presents a proposal for modeling the impact of the quality of the PM process on the quality of the con­structed building. The quality of the PM process is rep­resented by the main quality factors and product quality indicators. It presents the results of the interviews that were conducted and study cases that were analyzed in Bosnia and Herzegovina with a variety of project partici­pants (with different managerial perspectives in terms of the indicators of quality of the delivered product. All par­ticipants, regardless of managerial perspective, believe that the most important indicator of the quality of prod­ucts for each phase of the project is “customer satisfaction in the end phase”, the measurement of which is different for each project phase that is presented. The results of the factor analysis of the definition and the planning phases show that 11 variables, namely, the quality factors of the PM process, can be grouped into three new factors, which is described as 66.61% (77.046% of the basic set of vari­ables.

  14. Annual report on the Background Soil Characterization Project on the Oak Ridge Reservation, Oak Ridge, Tennessee: Results of Phase 1 investigation

    International Nuclear Information System (INIS)

    Watkins, D.R.; Goddard, P.L.; Hatmaker, T.L.; Hook, L.A.; Jackson, B.L.; Kimbrough, C.W.; Lee, S.Y.; Lietzke, D.A.; McGin, C.W.; Nourse, B.D.; Schmoyer, R.L.; Shaw, R.A.; Stinnette, S.E.; Switek, J.; Wright, J.C.; Ammons, J.T.; Branson, J.L.; Burgoa, B.B.

    1993-05-01

    Many constituents of potential concern for human health occur naturally at low concentrations in undisturbed soils. The Background soil Characterization Project (BSCP) was undertaken to provide background concentration data on potential contaminants in natural soils on the Oak Ridge Reservation (ORR). The objectives of the BSCP are to provide baseline data for contaminated site assessment and estimates of potential human health risk associated with background concentrations of hazardous and other constituents in native soils. This report presents, evaluates, and documents data and results obtained in Phase I of the project. It is intended to be a stand-alone document for application and use in structuring and conducting remedial investigation and remedial action projects in the Environmental Restoration (ER) Program

  15. Annual report on the Background Soil Characterization Project on the Oak Ridge Reservation, Oak Ridge, Tennessee: Results of Phase 1 investigation

    Energy Technology Data Exchange (ETDEWEB)

    Watkins, D.R.; Goddard, P.L.; Hatmaker, T.L.; Hook, L.A.; Jackson, B.L.; Kimbrough, C.W.; Lee, S.Y.; Lietzke, D.A.; McGin, C.W.; Nourse, B.D.; Schmoyer, R.L.; Shaw, R.A.; Stinnette, S.E.; Switek, J.; Wright, J.C. [Oak Ridge National Lab., TN (United States); Ammons, J.T.; Branson, J.L.; Burgoa, B.B. [Tennessee Univ., Knoxville, TN (United States). Dept. of Plant and Soil Science; Lietzke, D.A. [Lietzke (David A.), Rutledge, TN (United States)

    1993-05-01

    Many constituents of potential concern for human health occur naturally at low concentrations in undisturbed soils. The Background soil Characterization Project (BSCP) was undertaken to provide background concentration data on potential contaminants in natural soils on the Oak Ridge Reservation (ORR). The objectives of the BSCP are to provide baseline data for contaminated site assessment and estimates of potential human health risk associated with background concentrations of hazardous and other constituents in native soils. This report presents, evaluates, and documents data and results obtained in Phase I of the project. It is intended to be a stand-alone document for application and use in structuring and conducting remedial investigation and remedial action projects in the Environmental Restoration (ER) Program.

  16. How do ICT project managers manage project knowledge in the public sector? An empirical enquiry from the Victorian Public Sector in Australia

    Directory of Open Access Journals (Sweden)

    Yakub Karagoz

    2016-10-01

    Full Text Available Projects are temporal organisation forms that are highly knowledge-intensive and play an important role in modern public (and private sector organisations. The effective and efficient creation, dissemination, application and conservation of relevant knowledge are a critical success factor in the management of projects. Yet, project management (PM and knowledge management (KM are two distinct disciplines. This paper explores the relationship between PM and KM by analysing the literature at the intersection of those disciplines and presenting the empirical results of a case study of the Victorian Public Sector (VPS in Australia. A series of 14 interviews were conducted to explore how ICT project managers manage project knowledge across the departments of the VPS. Findings show a strong preference among the participants for informal, face-to-face interactions and agile approaches to facilitate knowledge transfer and creation in ICT project environments.

  17. Projection pursuit water quality evaluation model based on chicken swam algorithm

    Science.gov (United States)

    Hu, Zhe

    2018-03-01

    In view of the uncertainty and ambiguity of each index in water quality evaluation, in order to solve the incompatibility of evaluation results of individual water quality indexes, a projection pursuit model based on chicken swam algorithm is proposed. The projection index function which can reflect the water quality condition is constructed, the chicken group algorithm (CSA) is introduced, the projection index function is optimized, the best projection direction of the projection index function is sought, and the best projection value is obtained to realize the water quality evaluation. The comparison between this method and other methods shows that it is reasonable and feasible to provide decision-making basis for water pollution control in the basin.

  18. The Industrial Toxics Project: Targeting chemicals for environmental results

    International Nuclear Information System (INIS)

    Burch, W.M.

    1991-01-01

    In September, 1990, the Administrator of the US Environmental Protection Agency committed the Agency to a program of targeting chemicals for multi-media risk reduction activities through pollution prevention. The Industrial Toxics Project will place emphasis on obtaining voluntary commitments from industry to reduce releases of toxic chemicals to the air, water, and land with a goal of reducing releases nationwide by 33% by 1992 and 50% by 1995. An initial list of 18 chemicals have been selected based on recommendations from each Agency program. The chemicals selected are subject to reporting under the Toxic Chemical Release Inventory Program which will provide the basis for tracking progress. The chemicals are characterized by high production volume, toxicity and releases and present the potential for significant risk reduction through pollution prevention. This presentation will discuss the focus and direction of this new initiative

  19. INSPIRE Project (IoNospheric Sounding for Pre-seismic anomalies Identification REsearch): Main Results and Future Prospects

    Science.gov (United States)

    Pulinets, S. A.; Andrzej, K.; Hernandez-Pajares, M.; Cherniak, I.; Zakharenkova, I.; Rothkaehl, H.; Davidenko, D.

    2017-12-01

    The INSPIRE project is dedicated to the study of physical processes and their effects in ionosphere which could be determined as earthquake precursors together with detailed description of the methodology of ionospheric pre-seismic anomalies definition. It was initiated by ESA and carried out by international consortium. The physical mechanisms of the ionospheric pre-seismic anomalies generation from ground to the ionosphere altitudes were formulated within framework of the Lithosphere-Atmosphere-Ionosphere-Magnetosphere Coupling (LAIMC) model (Pulinets et al., 2015). The general algorithm for the identification of the ionospheric precursors was formalized which also takes into account the external Space Weather factors able to generate the false alarms. Importance of the special stable pattern called the "precursor mask" was highlighted which is based on self-similarity of pre-seismic ionospheric variations. The role of expert decision in pre-seismic anomalies interpretation for generation of seismic warning is important as well. The algorithm performance of the LAIMC seismo-ionospheric effect detection module has been demonstrated using the L'Aquila 2009 earthquake as a case study. The results of INSPIRE project have demonstrated that the ionospheric anomalies registered before the strong earthquakes could be used as reliable precursors. The detailed classification of the pre-seismic anomalies was presented in different regions of the ionosphere and signatures of the pre-seismic anomalies as detected by ground and satellite based instruments were described what clarified methodology of the precursor's identification from ionospheric multi-instrumental measurements. Configuration for the dedicated multi-observation experiment and satellite payload was proposed for the future implementation of the INSPIRE project results. In this regard the multi-instrument set can be divided by two groups: space equipment and ground-based support, which could be used for real

  20. [Air pollution and mortality in twenty-five Italian cities: results of the EpiAir2 Project].

    Science.gov (United States)

    Alessandrini, Ester Rita; Faustini, Annunziata; Chiusolo, Monica; Stafoggia, Massimo; Gandini, Martina; Demaria, Moreno; Antonelli, Antonello; Arena, Pasquale; Biggeri, Annibale; Canova, Cristina; Casale, Giovanna; Cernigliaro, Achille; Garrone, Elsa; Gherardi, Bianca; Gianicolo, Emilio Antonio Luca; Giannini, Simone; Iuzzolino, Claudia; Lauriola, Paolo; Mariottini, Mauro; Pasetto, Paolo; Randi, Giorgia; Ranzi, Andrea; Santoro, Michele; Selle, Vittorio; Serinelli, Maria; Stivanello, Elisa; Tominz, Riccardo; Vigotti, Maria Angela; Zauli-Sajani, Stefano; Forastiere, Francesco; Cadum, Ennio

    2013-01-01

    this study aims at presenting the results from the Italian EpiaAir2 Project on the short-term effects of air pollution on adult population (35+ years old) in 25 Italian cities. the short-term effects of air pollution on resident people died in their city were analysed adopting the time series approach. The association between increases in 10µg/m(3) in PM10, PM2.5, NO2 and O3 air concentration and natural, cardiac, cerebrovascular and respiratory mortality was studied. City-specific Poisson models were fitted to estimate the association of daily concentrations of pollutants with daily counts of deaths. The analysis took into account temporal and meteorological factors to control for potential confounding effect. Pooled estimates have been derived from random effects meta-analysis, evaluating the presence of heterogeneity in the city specific results. it was analysed 422,723 deaths in the 25 cities of the project among people aged 35 years or more, resident in each city during the period 2006-2010. daily counts of natural, cardiac, cerebrovascular, and respiratory mortality, obtained from the registries of each city. Demographic information were obtained by record linkage procedure with the civil registry of each city. mean number of deaths for natural causes ranged from 513 in Rovigo to 20,959 in Rome. About 25% of deaths are due to cardiac diseases, 10% to cerebrovascular diseases, and 7% to respiratory diseases. It was found an immediate effect of PM10 on natural mortality (0.51%; 95%CI 0.16-0.86; lag 0-1). More relevant and prolonged effects (lag 0-5) have been found for PM2.5 (0.78%; 95%CI 0.12-1.46) and NO2 (1.10%; 95%CI 0.63-1.58). Increases in cardiac mortality are associated with PM10 (0.93%; 95%CI 0.16-1.70) and PM2.5 (1.25%; 95%CI 0.17-2.34), while for respiratory mortality exposure to NO2 has an important role (1.67%; 95%CI 0.23-3.13; lag 2-5), as well as PM10 (1.41%; 95%CI - 0.23;+3.08). Results are strongly homogeneous among cities, except for

  1. Risk assessment framework on time impact: Infrastructure projects in soft soil during construction stage

    Science.gov (United States)

    Low, W. W.; Wong, K. S.; Lee, J. L.

    2018-04-01

    With the growth of economy and population, there is an increase in infrastructure construction projects. As such, it is unavoidable to have construction projects on soft soil. Without proper risk management plan, construction projects are vulnerable to different types of risks which will have negative impact on project’s time, cost and quality. Literature review showed that little or none of the research is focused on the risk assessment on the infrastructure project in soft soil. Hence, the aim of this research is to propose a risk assessment framework in infrastructure projects in soft soil during the construction stage. This research was focused on the impact of risks on project time and internal risk factors. The research method was Analytical Hierarchy Process and the sample population was experienced industry experts who have experience in infrastructure projects. Analysis was completed and result showed that for internal factors, the five most significant risks on time element are lack of special equipment, potential contractual disputes and claims, shortage of skilled workers, delay/lack of materials supply, and insolvency of contractor/sub-contractor. Results indicated that resources risk factor play a critical role on project time frame in infrastructure projects in soft soil during the construction stage.

  2. Measurements of eye lens doses in interventional radiology and cardiology: Final results of the ORAMED project

    International Nuclear Information System (INIS)

    Vanhavere, F.; Carinou, E.; Domienik, J.; Donadille, L.; Ginjaume, M.; Gualdrini, G.; Koukorava, C.; Krim, S.; Nikodemova, D.; Ruiz-Lopez, N.; Sans-Merce, M.; Struelens, L.

    2011-01-01

    Within the ORAMED project (Optimization of Radiation Protection of Medical Staff) a coordinated measurement program for occupationally exposed medical staff was performed in different hospitals in Europe ( (www.oramed-fp7.eu)). The main objective was to obtain a set of standardized data on extremity and eye lens doses for staff involved in interventional radiology and cardiology and to optimize radiation protection. Special attention was given to the measurement of the doses to the eye lenses. In this paper an overview will be given of the measured eye lens doses and the main influence factors for these doses. The measured eye lens doses are extrapolated to annual doses. The extrapolations showed that monitoring of the eye lens should be performed on routine basis.

  3. EPRtm project experience: selection of partners and supply chain

    International Nuclear Information System (INIS)

    Lorenzo, D. de

    2012-01-01

    With 4 EPR T M units under construction, the new plants to be built in the following years will benefit from the return on experience of the work already performed. The knowledge about licensing processes, detail engineering, supply chain, logistics and on-site work gathered from the Olkiluoto 3 and Flamanville 3 projects has already been used in the Taishan 1 and 2 project, resulting in a project that is on schedule and on budget. This article will show how the advantage of such broad experience gained will be used to benefit future projects to ensure certainty of completion, leaving few and limited unresolved issues even before the beginning of the project. Several areas that are not usually tackled when speaking of a New Build project will be covered by this text from the point of view of a nuclear vendor: Project Partnership Selection and the Gate Review Process applied by AREVA in the supply chain of the main components. (Author)

  4. Effect of smoking habit on the frequency of micronuclei in human lymphocytes: results from the human micronucleus project

    International Nuclear Information System (INIS)

    Bonassi, Stefano; Neri, M.; Lando, Cecilia

    2004-01-01

    Full text: The effect of tobacco smoking on the frequency of micronuclei (MN) in human lymphocytes has been the object of many population studies. In most reports, the results were unexpectedly negative, and in many instances smokers had lower frequencies of MN than non-smokers. A pooled re-analysis of 24 databases from the HUMN international collaborative project has been performed with the aim of understanding the impact of smoking habits on MN frequency. The complete database included 5710 subjects, with 3501 non-smokers, 1409 current smokers, and 800 former smokers, among subjects in occupational and environmental surveys. The overall result of the re-analysis confirmed the small decrease of MN frequencies in current smokers (frequency ratio (FR =0.97, 95% confidence interval (CI =0.93-1.01) and in former smokers (FR =0.96, 95% CI =0.91-1.01), when compared to non-smokers. MN frequency was not influenced by the number of cigarettes smoked per day among subjects occupationally exposed to genotoxic agents, whereas a typical U-shaped curve is observed for non-exposed smokers, showing a significant increase of MN frequency in individuals smoking 30 cigarettes or more per day (FR =1.59, 95% CI =1.35-1.88). This analysis confirmed that smokers do not experience an overall increase in MN frequency, although when the interaction with occupational exposure is taken into account, heavy smokers were the only group showing a significant increase in genotoxic damage as measured by the micronucleus assay in lymphocytes. From these results some general recommendations for the design of bio monitoring studies involving smokers can be formulated. Quantitative data about smoking habit should always be collected because, in the absence of such data, the simple comparison of smokers versus non-smokers could be misleading. The sub-group of heavy smokers (≥30 cigarettes per day) should be specifically evaluated whenever it is large enough to satisfy statistical requirements. The

  5. [Willingness to accept an Internet-based mobility platform in different age cohorts. Empiric results of the project S-Mobil 100].

    Science.gov (United States)

    Beil, J; Cihlar, V; Kruse, A

    2015-02-01

    The aim of the project S-Mobil 100 is to develop and implement a prototype of an internet-based, generation-appropriate mobility platform in the model region Siegen-Wittgenstein. In the context of an empirical preliminary study, use of technology, experience with technology, general attitudes towards technology, general technology commitment, and the willingness to accept the mobility platform were investigated in different age cohorts. The investigation was carried out using a written survey based on a standardized questionnaire. The sample of 358 persons aged 40-90 years was divided in four age cohorts (40-54, 55-64, 65-74, and 75 + years). Our results show a high willingness to accept the mobility platform in the overall sample. Age, residence, income, and general technology commitment were significant predictors for the judgment of the platform. Although there were group differences in accepting the mobility platform, the older cohorts are also open-minded towards this new technology.

  6. Assessing U.S. ESCO industry performance and market trends: Results from the NAESCO database project

    International Nuclear Information System (INIS)

    Osborn, Julie; Goldman, Chuck; Hopper, Nicole; Singer, Terry

    2002-01-01

    The U.S. Energy Services Company (ESCO) industry is often cited as the most successful model for the private sector delivery of energy-efficiency services. This study documents actual performance of the ESCO industry in order to provide policymakers and investors with objective informative and customers with a resource for benchmarking proposed projects relative to industry performance. We have assembled a database of nearly 1500 case studies of energy-efficiency projects - the most comprehensive data set of the U.S. ESCO industry available. These projects include$2.55B of work completed by 51 ESCOs and span much of the history of this industry

  7. Uav Photogrammetry: a Practical Solution for Challenging Mapping Projects

    Science.gov (United States)

    Saadatseresht, M.; Hashempour, A. H.; Hasanlou, M.

    2015-12-01

    We have observed huge attentions to application of unmanned aerial vehicle (UAV) in aerial mapping since a decade ago. Though, it has several advantages for handling time/cost/quality issues, there are a dozen of challenges in working with UAVs. In this paper, we; as the Robotic Photogrammetry Research Group (RPRG), will firstly review these challenges then show its advantages in three special practical projects. For each project, we will share our experiences through description of the UAV specifications, flight settings and processing steps. At the end, we will illustrate final result of each project and show how this technology could make unbelievable benefits to clients including 3D city realistic model in decimetre level, ultra high quality map production in several centimetre level, and accessing to a high risk and rough relief area for mapping aims.

  8. An Undergraduate Endeavor: Assembling a Live Planetarium Show About Mars

    Science.gov (United States)

    McGraw, Allison M.

    2016-10-01

    Viewing the mysterious red planet Mars goes back thousands of years with just the human eye but in more recent years the growth of telescopes, satellites and lander missions unveil unrivaled detail of the Martian surface that tells a story worth listening to. This planetarium show will go through the observations starting with the ancients to current understandings of the Martian surface, atmosphere and inner-workings through past and current Mars missions. Visual animations of its planetary motions, display of high resolution images from the Hi-RISE (High Resolution Imaging Science Experiment) and CTX (Context Camera) data imagery aboard the MRO (Mars Reconnaissance Orbiter) as well as other datasets will be used to display the terrain detail and imagery of the planet Mars with a digital projection system. Local planetary scientists and Mars specialists from the Lunar and Planetary Lab at the University of Arizona (Tucson, AZ) will be interviewed and used in the show to highlight current technology and understandings of the red planet. This is an undergraduate project that is looking for collaborations and insight in order gain structure in script writing that will teach about this planetary body to all ages in the format of a live planetarium show.

  9. An Accurate and Impartial Expert Assignment Method for Scientific Project Review

    Directory of Open Access Journals (Sweden)

    Mingliang Yue

    2017-12-01

    Full Text Available Purpose: This paper proposes an expert assignment method for scientific project review that considers both accuracy and impartiality. As impartial and accurate peer review is extremely important to ensure the quality and feasibility of scientific projects, enhanced methods for managing the process are needed. Design/methodology/approach: To ensure both accuracy and impartiality, we design four criteria, the reviewers’ fitness degree, research intensity, academic association, and potential conflict of interest, to express the characteristics of an appropriate peer review expert. We first formalize the expert assignment problem as an optimization problem based on the designed criteria, and then propose a randomized algorithm to solve the expert assignment problem of identifying reviewer adequacy. Findings: Simulation results show that the proposed method is quite accurate and impartial during expert assignment. Research limitations: Although the criteria used in this paper can properly show the characteristics of a good and appropriate peer review expert, more criteria/conditions can be included in the proposed scheme to further enhance accuracy and impartiality of the expert assignment. Practical implications: The proposed method can help project funding agencies (e.g. the National Natural Science Foundation of China find better experts for project peer review. Originality/value: To the authors’ knowledge, this is the first publication that proposes an algorithm that applies an impartial approach to the project review expert assignment process. The simulation results show the effectiveness of the proposed method.

  10. The BioREGIO Carpathians project: aims, methodology and results from the “Continuity and Connectivity” analysis

    Directory of Open Access Journals (Sweden)

    Filippo Favilli

    2015-07-01

    Full Text Available BioREGIO Carpathians is a transnational cooperation project, co-financed under the second call of the EU South East Europe Transnational Cooperation Programme, priority area “Protection and Improvement of the Environment”. BioREGIO Carpathians run for three years (2011–2013 and is a flagship project for the Carpathian Convention (article four dealing with landscape and biological diversity, its Biodiversity Protocol and the Biodiversity Working Group. The project is built on the conservation, restoration and valorisation of the Carpathians ecological continuum to enable large herbivores and carnivores to live in coexistence with modern society. The Carpathian countries are expecting a massive pressure to modernize and extend their road infrastructures. If not considering the requirements of ecological network, this run-to-development will enhance landscape fragmentation, limit dispersal and genetic exchange of wildlife species. BioREGIO applied a multi-disciplinary approach (physical, legal and socio-economic in order to identify the most influencing barriers regarding connectivity throughout the Carpathians. Using two ArcGIS 10.0 tools in a three-step approach and a series of site visits, the continuity and connectivity analysis identified not only physical barriers but also legal aspects and socio-economic behaviour that are influencing ecological connectivity and playing a major role to conserve wildlife population. The investigation on the ground together with local experts and stakeholders enabled the adaptation of the GIS results and the development of feasible solutions to overcome the detected barriers with recommended priorities for implementing appropriate measurements to maintain connectivity and to sustain large carnivores, herbivores and biodiversity in the Carpathians.

  11. Integrated monitoring and surveillance system demonstration project: Phase I accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Crawford, D.C.

    1997-01-01

    The authors present the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase I efforts. The rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include decisions to use Echelon LonWorks networking protocol and Microsoft Access for the data system needs, a preliminary design for the plutonium canning system glovebox, identification of facilities and materials available for the demonstration, determination of possibly affected facility documentation, and a preliminary list of available sensor technologies. Recently imposed changes in the overall project schedule and scope are also discussed and budgetary requirements for competition of Phase II presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase I deliverables

  12. Summary results of an assessment of research projects in the Nuclear Medicine Research program

    International Nuclear Information System (INIS)

    1988-01-01

    In May 1987, OHER management requested the Office of Program Analysis (OPA) to conduct a peer review of the projects of the DOE Nuclear Medicine Research program. This was done using procedures and a quantitative methodology OPA developed for assessing DOE research programs. Sixty-three individual nuclear medicine projects were reviewed by seven panels; one panel on isotopes and radioisotopes, three on radiopharmacology, two on clinical feasibility, and one on instrumentation. Each panel consisted of five to ten knowledgeable reviewers. 5 figs

  13. Risk assessment for construction projects of transport infrastructure objects

    Science.gov (United States)

    Titarenko, Boris

    2017-10-01

    The paper analyzes and compares different methods of risk assessment for construction projects of transport objects. The management of such type of projects demands application of special probabilistic methods due to large level of uncertainty of their implementation. Risk management in the projects requires the use of probabilistic and statistical methods. The aim of the work is to develop a methodology for using traditional methods in combination with robust methods that allow obtaining reliable risk assessments in projects. The robust approach is based on the principle of maximum likelihood and in assessing the risk allows the researcher to obtain reliable results in situations of great uncertainty. The application of robust procedures allows to carry out a quantitative assessment of the main risk indicators of projects when solving the tasks of managing innovation-investment projects. Calculation of damage from the onset of a risky event is possible by any competent specialist. And an assessment of the probability of occurrence of a risky event requires the involvement of special probabilistic methods based on the proposed robust approaches. Practice shows the effectiveness and reliability of results. The methodology developed in the article can be used to create information technologies and their application in automated control systems for complex projects.

  14. 16(th) IHIW: analysis of HLA population data, with updated results for 1996 to 2012 workshop data (AHPD project report).

    Science.gov (United States)

    Riccio, M E; Buhler, S; Nunes, J M; Vangenot, C; Cuénod, M; Currat, M; Di, D; Andreani, M; Boldyreva, M; Chambers, G; Chernova, M; Chiaroni, J; Darke, C; Di Cristofaro, J; Dubois, V; Dunn, P; Edinur, H A; Elamin, N; Eliaou, J-F; Grubic, Z; Jaatinen, T; Kanga, U; Kervaire, B; Kolesar, L; Kunachiwa, W; Lokki, M L; Mehra, N; Nicoloso, G; Paakkanen, R; Voniatis, D Papaioannou; Papasteriades, C; Poli, F; Richard, L; Romón Alonso, I; Slavčev, A; Sulcebe, G; Suslova, T; Testi, M; Tiercy, J-M; Varnavidou, A; Vidan-Jeras, B; Wennerström, A; Sanchez-Mazas, A

    2013-02-01

    We present here the results of the Analysis of HLA Population Data (AHPD) project of the 16th International HLA and Immunogenetics Workshop (16IHIW) held in Liverpool in May-June 2012. Thanks to the collaboration of 25 laboratories from 18 different countries, HLA genotypic data for 59 new population samples (either well-defined populations or donor registry samples) were gathered and 55 were analysed statistically following HLA-NET recommendations. The new data included, among others, large sets of well-defined populations from north-east Europe and West Asia, as well as many donor registry data from European countries. The Gene[rate] computer tools were combined to create a Gene[rate] computer pipeline to automatically (i) estimate allele frequencies by an expectation-maximization algorithm accommodating ambiguities, (ii) estimate heterozygosity, (iii) test for Hardy-Weinberg equilibrium (HWE), (iv) test for selective neutrality, (v) generate frequency graphs and summary statistics for each sample at each locus and (vi) plot multidimensional scaling (MDS) analyses comparing the new samples with previous IHIW data. Intrapopulation analyses show that HWE is rarely rejected, while neutrality tests often indicate a significant excess of heterozygotes compared with neutral expectations. The comparison of the 16IHIW AHPD data with data collected during previous workshops (12th-15th) shows that geography is an excellent predictor of HLA genetic differentiations for HLA-A, -B and -DRB1 loci but not for HLA-DQ, whose patterns are probably more influenced by natural selection. In Europe, HLA genetic variation clearly follows a north to south-east axis despite a low level of differentiation between European, North African and West Asian populations. Pacific populations are genetically close to Austronesian-speaking South-East Asian and Taiwanese populations, in agreement with current theories on the peopling of Oceania. Thanks to this project, HLA genetic variation is more

  15. An extension to artifact-free projection overlaps

    International Nuclear Information System (INIS)

    Lin, Jianyu

    2015-01-01

    Purpose: In multipinhole single photon emission computed tomography, the overlapping of projections has been used to increase sensitivity. Avoiding artifacts in the reconstructed image associated with projection overlaps (multiplexing) is a critical issue. In our previous report, two types of artifact-free projection overlaps, i.e., projection overlaps that do not lead to artifacts in the reconstructed image, were formally defined and proved, and were validated via simulations. In this work, a new proposition is introduced to extend the previously defined type-II artifact-free projection overlaps so that a broader range of artifact-free overlaps is accommodated. One practical purpose of the new extension is to design a baffle window multipinhole system with artifact-free projection overlaps. Methods: First, the extended type-II artifact-free overlap was theoretically defined and proved. The new proposition accommodates the situation where the extended type-II artifact-free projection overlaps can be produced with incorrectly reconstructed portions in the reconstructed image. Next, to validate the theory, the extended-type-II artifact-free overlaps were employed in designing the multiplexing multipinhole spiral orbit imaging systems with a baffle window. Numerical validations were performed via simulations, where the corresponding 1-pinhole nonmultiplexing reconstruction results were used as the benchmark for artifact-free reconstructions. The mean square error (MSE) was the metric used for comparisons of noise-free reconstructed images. Noisy reconstructions were also performed as part of the validations. Results: Simulation results show that for noise-free reconstructions, the MSEs of the reconstructed images of the artifact-free multiplexing systems are very similar to those of the corresponding 1-pinhole systems. No artifacts were observed in the reconstructed images. Therefore, the testing results for artifact-free multiplexing systems designed using the

  16. Status of data, major results, and plans for geophysical activities, Yucca Mountain Project

    Energy Technology Data Exchange (ETDEWEB)

    Oliver, H.W. [Geological Survey, Menlo Park, CA (USA); Hardin, E.L. [Science Applications International Corp., Las Vegas, NV (USA); Nelson, P.H. [Geological Survey, Denver, CO (USA)] [eds.

    1990-07-01

    This report describes past and planned geophysical activities associated with the Yucca Mountain Project and is intended to serve as a starting point for integration of geophysical activities. This report relates past results to site characterization plans, as presented in the Yucca Mountain Site Characterization Plan (SCP). This report discusses seismic exploration, potential field methods, geoelectrical methods, teleseismic data collection and velocity structural modeling, and remote sensing. This report discusses surface-based, airborne, borehole, surface-to-borehole, crosshole, and Exploratory Shaft Facility-related activities. The data described in this paper, and the publications discussed, have been selected based on several considerations; location with respect to Yucca Mountain, whether the success or failure of geophysical data is important to future activities, elucidation of features of interest, and judgment as to the likelihood that the method will produce information that is important for site characterization. 65 refs., 19 figs., 12 tabs.

  17. Status of data, major results, and plans for geophysical activities, Yucca Mountain Project

    International Nuclear Information System (INIS)

    Oliver, H.W.; Hardin, E.L.; Nelson, P.H.

    1990-07-01

    This report describes past and planned geophysical activities associated with the Yucca Mountain Project and is intended to serve as a starting point for integration of geophysical activities. This report relates past results to site characterization plans, as presented in the Yucca Mountain Site Characterization Plan (SCP). This report discusses seismic exploration, potential field methods, geoelectrical methods, teleseismic data collection and velocity structural modeling, and remote sensing. This report discusses surface-based, airborne, borehole, surface-to-borehole, crosshole, and Exploratory Shaft Facility-related activities. The data described in this paper, and the publications discussed, have been selected based on several considerations; location with respect to Yucca Mountain, whether the success or failure of geophysical data is important to future activities, elucidation of features of interest, and judgment as to the likelihood that the method will produce information that is important for site characterization. 65 refs., 19 figs., 12 tabs

  18. Fisher research and the Kings River Sustainable Forest Ecosystem Project: current results and future efforts

    Science.gov (United States)

    Brian B. Boroski; Richard T. Golightly; Amie K. Mazzoni; Kimberly A. Sager

    2002-01-01

    The Kings River Sustainable Forest Ecosystems Project was initiated on the Kings River Ranger District of the Sierra National Forest, California, in 1993, with fieldwork beginning in 1994. Knowledge of the ecology of the fisher (Martes pennanti) in the Project area, and in the Sierra Nevada of California in general, is insufficient to develop...

  19. The central Iowa project.

    Science.gov (United States)

    Allen, H M

    1994-10-01

    This project developed and tested a population-based survey, the HS Form, to examine health and health care in the Central Iowa community. Data from this new collection of proven sets of items were used to compare competing health plans, doctor offices, hospitals, and to develop preliminary norms of the community's insured, in two areas: system performance and health burden. The results showed that the survey: (1) was both feasible and efficient in delivering a comprehensive and generic assessment of consumers and patients; (2) revealed consistent, noteworthy differences between plans and between providers across both sets of criteria; and (3) indicated that there is substantial room for improvement in Central Iowa's health care delivery system from the public's perspective. Recommendations for next steps include: (1) following through on the June 1993 community forum (held to discuss the project's methods and results with local decision makers); (2) broadening the evaluation design to increase sample representativeness; and (3) implementing a pre/post approach to measure changes in plan and provider performance.

  20. Challenges of executing heavy oil projects in today's market

    International Nuclear Information System (INIS)

    Brunka, G.

    2001-01-01

    Alberta's industrial project scene from 1981 to 2000 was presented in this power point presentation with particular focus on proposed bitumen recovery projects and heavy oil project challenges. A graph depicting GTG world orders by region (Americas, Asia and Europe) showed that U.S. market continues to drive global growth. Major industrial projects in Alberta were highlighted and employment requirements by sector were outlined. In addition, mitigation measures that are needed to successfully deal with the unique challenges of today's market were described. It was noted that in recent years lower capital expenditure by the industry in general has resulted in corporate downsizing or mergers which in turn have resulted in lower technical and operational knowledge. Some of the current challenges facing the industry are new demands for water treatment expertise and an aging workforce. It was concluded that effective mitigation will require a disciplined approach within a flexible framework.1 tab., 7 figs

  1. U.S. Department of Energy's initiatives for proliferation prevention in Russia: results of radioactive liquid waste treatment project, year 2

    International Nuclear Information System (INIS)

    Pokhitonov, Y.; Kamachev, V.; Kelley, D.

    2010-10-01

    The objective of the project is to engage weapons scientists with training and research programs at selected nuclear sites in Russia and apply high technology polymers to immobilize legacy ILW and HLW liquids that have posed environmental challenges over the years. One compelling advantage of the projects is that V.G. Khlopin Radium Institute and Pacific Nuclear Solutions have been engaged in applied research for seven years to validate the performance and effectiveness of the polymer technology for use with radioactive liquids. With conclusive results of the research work on sixty active and simulant waste streams, the project can focus on actual applications of the technology at Ozersk (Mayak), Sever sk (SCC) Zheleznogorsk (MCC) and Gatchyna rather that on pure research. The long term objective of the project is find viable waste management solutions for serious radioactive and chemical contamination that has existed in Russia and the U. S. for several decades. The polymer technologies may be applied to all radioactive liquid. This paper summarizes the experimental work of the immobilization process and data definition of the most effective polymer compositions in addition to determining the optimum polymer to liquid ratios for economic considerations. (Author)

  2. A segmentation algorithm based on image projection for complex text layout

    Science.gov (United States)

    Zhu, Wangsheng; Chen, Qin; Wei, Chuanyi; Li, Ziyang

    2017-10-01

    Segmentation algorithm is an important part of layout analysis, considering the efficiency advantage of the top-down approach and the particularity of the object, a breakdown of projection layout segmentation algorithm. Firstly, the algorithm will algorithm first partitions the text image, and divided into several columns, then for each column scanning projection, the text image is divided into several sub regions through multiple projection. The experimental results show that, this method inherits the projection itself and rapid calculation speed, but also can avoid the effect of arc image information page segmentation, and also can accurate segmentation of the text image layout is complex.

  3. Comparing climate projections to observations up to 2011

    International Nuclear Information System (INIS)

    Rahmstorf, Stefan; Foster, Grant; Cazenave, Anny

    2012-01-01

    We analyse global temperature and sea-level data for the past few decades and compare them to projections published in the third and fourth assessment reports of the Intergovernmental Panel on Climate Change (IPCC). The results show that global temperature continues to increase in good agreement with the best estimates of the IPCC, especially if we account for the effects of short-term variability due to the El Niño/Southern Oscillation, volcanic activity and solar variability. The rate of sea-level rise of the past few decades, on the other hand, is greater than projected by the IPCC models. This suggests that IPCC sea-level projections for the future may also be biased low. (letter)

  4. Economic assessment of a waste hydrogen utilization project

    International Nuclear Information System (INIS)

    Zhou, H.; Wang, L.; Zhou, W.; Wu, J.; Wang, Q.

    1993-01-01

    This article reports an economic assessment on a hydride hydrogen recovery, purification, storage, transportation and application project (HRPSTA) set for a system including a nitrogenous fertilizer plant and a float glass factory. In this project, a pretreatment unit and metal hydride containers are used to recover and purify the hydrogen from the purge gas of the ammonia fertilizer plant and to transport and use the hydrogen in the tin bath in the float glass factory. Detailed economic assessment, cost analysis and a cash flow statement are presented, and financial net present value (NPV), as well as intrinsic rate of return (IRR), is calculated. The results shows that this project, which is feasible technologically, is profitable economically. (Author)

  5. Small-scale bioenergy projects in rural China: Lessons to be learnt

    International Nuclear Information System (INIS)

    Han Jingyi; Mol, Arthur P.J.; Lu Yonglong; Zhang Lei

    2008-01-01

    Large amounts of small-scale bioenergy projects were carried out in China's rural areas in light of its national renewable energy policies. These projects applied pyrolysis gasification as the main technology, which turns biomass waste at low costs into biogas. This paper selects seven bioenergy projects in Shandong Province as a case and assesses these projects in terms of economy, technological performance and effectiveness. Results show that these projects have not achieved a satisfying performance after 10 years experience. Many projects have been discontinued. This failure is attributed to a complex of shortcomings in institutional structure, technical level, financial support and social factors. For a more successful future development of bioenergy in rural areas, China should reform its institutional structure, establish a renewable energy market and enhance the technological level of bioenergy projects

  6. Agile Project Management for e-Learning Developments

    Science.gov (United States)

    Doherty, Iain

    2010-01-01

    We outline the project management tactics that we developed in praxis in order to manage elearning projects and show how our tactics were enhanced through implementing project management techniques from a formal project management methodology. Two key factors have contributed to our project management success. The first is maintaining a clear…

  7. Design, Results, Evolution and Status of the ATLAS Simulation at Point1 Project

    Science.gov (United States)

    Ballestrero, S.; Batraneanu, S. M.; Brasolin, F.; Contescu, C.; Fazio, D.; Di Girolamo, A.; Lee, C. J.; Pozo Astigarraga, M. E.; Scannicchio, D. A.; Sedov, A.; Twomey, M. S.; Wang, F.; Zaytsev, A.

    2015-12-01

    During the LHC Long Shutdown 1 (LSI) period, that started in 2013, the Simulation at Point1 (Sim@P1) project takes advantage, in an opportunistic way, of the TDAQ (Trigger and Data Acquisition) HLT (High-Level Trigger) farm of the ATLAS experiment. This farm provides more than 1300 compute nodes, which are particularly suited for running event generation and Monte Carlo production jobs that are mostly CPU and not I/O bound. It is capable of running up to 2700 Virtual Machines (VMs) each with 8 CPU cores, for a total of up to 22000 parallel jobs. This contribution gives a review of the design, the results, and the evolution of the Sim@P1 project, operating a large scale OpenStack based virtualized platform deployed on top of the ATLAS TDAQ HLT farm computing resources. During LS1, Sim@P1 was one of the most productive ATLAS sites: it delivered more than 33 million CPU-hours and it generated more than 1.1 billion Monte Carlo events. The design aspects are presented: the virtualization platform exploited by Sim@P1 avoids interferences with TDAQ operations and it guarantees the security and the usability of the ATLAS private network. The cloud mechanism allows the separation of the needed support on both infrastructural (hardware, virtualization layer) and logical (Grid site support) levels. This paper focuses on the operational aspects of such a large system during the upcoming LHC Run 2 period: simple, reliable, and efficient tools are needed to quickly switch from Sim@P1 to TDAQ mode and back, to exploit the resources when they are not used for the data acquisition, even for short periods. The evolution of the central OpenStack infrastructure is described, as it was upgraded from Folsom to the Icehouse release, including the scalability issues addressed.

  8. Harvard Project Physics Newsletter 10. The Project Physics Course, Text.

    Science.gov (United States)

    Harvard Univ., Cambridge, MA. Harvard Project Physics.

    A short description of the availability of Harvard Project Physics course components is given as is a discussion of the growth of the use of Project Physics in schools, including some enrollment data and survey results. Locations of the 1970 and 1971 Summer Institutes are listed. Adaptations of Project Physics course outside the United States are…

  9. Implementation of lean construction techniques for minimizing the risks effect on project construction time

    Directory of Open Access Journals (Sweden)

    Usama Hamed Issa

    2013-12-01

    Full Text Available The construction projects involve various risk factors which have various impacts on time objective that may lead to time-overrun. This study suggests and applies a new technique for minimizing risk factors effect on time using lean construction principles. The lean construction is implemented in this study using the last planner system through execution of an industrial project in Egypt. Evaluating the effect of using the new tool is described in terms of two measurements: Percent Expected Time-overrun (PET and Percent Plan Completed (PPC. The most important risk factors are identified and assessed, while PET is quantified at the project start and during the project execution using a model for time-overrun quantification. The results showed that total project time is reduced by 15.57% due to decreasing PET values, while PPC values improved. This is due to minimizing and mitigating the effect of most of the risk factors in this project due to implementing lean construction techniques. The results proved that the quantification model is suitable for evaluating the effect of using lean construction techniques. In addition, the results showed that average value of PET due to factors affected by lean techniques represents 67% from PET values due to all minimized risk factors.

  10. Designing a public web-based information system to illustrate and disseminate the development and results of the DESIRE Project to combat desertification.

    Science.gov (United States)

    Geeson, Nichola; Brandt, Jane; Quaranta, Giovanni; Salvia, Rosanna

    2014-11-01

    Until around 1995 it was challenging to make the scientific results of research projects publicly available except through presentations at meetings or conferences, or as papers in academic journals. Then it began to be clear that the Internet could become the main medium to publish and share new information with a much wider audience. The DESIRE Project (desertification mitigation and remediation of land-a global approach for local solutions) has built on expertise gained in previous projects to develop an innovative online 'Harmonized Information System' (HIS). This documents the context, delivery and evaluation of all tasks in the DESIRE Project using non-scientific terminology, with much of it also available in the local languages of the study sites. The DESIRE-HIS makes use of new possibilities for communication, including video clips, interactive tools, and links to social media networks such as Twitter. Dissemination of research results using this approach has required careful planning and design. This paper sets out the steps that have culminated in a complete online Information System about local solutions to global land management problems in desertification-affected areas, including many practical guidelines for responsible land management. As many of those who are affected by desertification do not have Internet access, printable dissemination materials are also available on the DESIRE-HIS.

  11. Designing a Public Web-Based Information System to Illustrate and Disseminate the Development and Results of the DESIRE Project to Combat Desertification

    Science.gov (United States)

    Geeson, Nichola; Brandt, Jane; Quaranta, Giovanni; Salvia, Rosanna

    2014-11-01

    Until around 1995 it was challenging to make the scientific results of research projects publicly available except through presentations at meetings or conferences, or as papers in academic journals. Then it began to be clear that the Internet could become the main medium to publish and share new information with a much wider audience. The DESIRE Project (desertification mitigation and remediation of land—a global approach for local solutions) has built on expertise gained in previous projects to develop an innovative online `Harmonized Information System' (HIS). This documents the context, delivery and evaluation of all tasks in the DESIRE Project using non-scientific terminology, with much of it also available in the local languages of the study sites. The DESIRE-HIS makes use of new possibilities for communication, including video clips, interactive tools, and links to social media networks such as Twitter. Dissemination of research results using this approach has required careful planning and design. This paper sets out the steps that have culminated in a complete online Information System about local solutions to global land management problems in desertification-affected areas, including many practical guidelines for responsible land management. As many of those who are affected by desertification do not have Internet access, printable dissemination materials are also available on the DESIRE-HIS.

  12. Effects of climate model interdependency on the uncertainty quantification of extreme reinfall projections

    DEFF Research Database (Denmark)

    Sunyer Pinya, Maria Antonia; Madsen, H.; Rosbjerg, Dan

    are independent. This study investigates the validity of this assumption and its effects on the estimated probabilistic projections of the changes in the 95% quantile of wet days. The methodology is divided in two main parts. First, the interdependency of the ENSEMBLES RCMs is estimated using the methodology...... developed by Pennell and Reichler (2011). The results show that the projections from the ENSEMBLES RCMs cannot be assumed independent. This result is then used to estimate the uncertainty in climate model projections. A Bayesian approach has been developed using the procedure suggested by Tebaldi et al...

  13. Effects of climate model interdependency on the uncertainty quantification of extreme rainfall projections

    DEFF Research Database (Denmark)

    Sunyer, M. A.; Rosbjerg, Dan; Arnbjerg-Nielsen, Karsten

    2017-01-01

    are independent. This study investigates the validity of this assumption and its effects on the estimated probabilistic projections of the changes in the 95% quantile of wet days. The methodology is divided in two main parts. First, the interdependency of the ENSEMBLES RCMs is estimated using the methodology...... developed by Pennell and Reichler (2011). The results show that the projections from the ENSEMBLES RCMs cannot be assumed independent. This result is then used to estimate the uncertainty in climate model projections. A Bayesian approach has been developed using the procedure suggested by Tebaldi et al...

  14. Causes of model dry and warm bias over central U.S. and impact on climate projections.

    Science.gov (United States)

    Lin, Yanluan; Dong, Wenhao; Zhang, Minghua; Xie, Yuanyu; Xue, Wei; Huang, Jianbin; Luo, Yong

    2017-10-12

    Climate models show a conspicuous summer warm and dry bias over the central United States. Using results from 19 climate models in the Coupled Model Intercomparison Project Phase 5 (CMIP5), we report a persistent dependence of warm bias on dry bias with the precipitation deficit leading the warm bias over this region. The precipitation deficit is associated with the widespread failure of models in capturing strong rainfall events in summer over the central U.S. A robust linear relationship between the projected warming and the present-day warm bias enables us to empirically correct future temperature projections. By the end of the 21st century under the RCP8.5 scenario, the corrections substantially narrow the intermodel spread of the projections and reduce the projected temperature by 2.5 K, resulting mainly from the removal of the warm bias. Instead of a sharp decrease, after this correction the projected precipitation is nearly neutral for all scenarios.Climate models repeatedly show a warm and dry bias over the central United States, but the origin of this bias remains unclear. Here the authors associate this bias to precipitation deficits in models and after applying a correction, projected precipitation in this region shows no significant changes.

  15. Projection: A Bibliography.

    Science.gov (United States)

    Pedrini, D. T.; Pedrini, Bonnie C.

    Sigmund Freud and his associates did much clinical work with the dynamic of projection, especially with regard to paranoid symptoms and syndromes. Much experimental work has also been done with projection. Sears evaluated the results of some of those studies. Murstein and Pryer sub-classified projection and reviewed typical studies. The…

  16. Search Results | Page 8 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Showing 71 - 80 of 157 results : "water adaptation". Project ... 60% of the world's population will reside in urban areas by the year 2025. ... Linking precaution to adaptive co-management to adapt rural water resources to climate change in Ghana ... The study assesses water quality change of the Akaki river system since the ...

  17. Search Results | Page 817 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Results 8161 - 8170 of 8494 ... Final report / Project "Raul Prebisch and XXIst century challenges" ... of the state and have had little or no say in decisions that matt ... Research findings show there is limited opportunity for female ... Copyright · Open access policy · Privacy policy · Research ethics · Transparency · Website usage.

  18. Perceptions of project managers regarding communication failures and barriers

    Directory of Open Access Journals (Sweden)

    Marilyn de Souza Cyganczuk

    2018-03-01

    Full Text Available The management of communication within a project can be considered as important as any other system within an organization because communication transmits and connects ideas, concepts, experiences and information on a project. This article describes an investigation of the problems in communication encountered by project managers in companies of different sizes and sectors in the project management area and compares these problems with what is found in the literature. Based on the study conducted, it was possible to identify the main barriers and failures in communication in these organizations and compare them with what is in the literature. The results showed that the main barriers and flaws found are: the lack of feedback to the members of the project team, the lack of trust among team members, channeling of misleading and distorted information, the lack of transmission of information or its transmission at an inopportune moment, and the limited knowledge and competencies of project managers, representing poor leadership and consequently impacting communication.

  19. Projection of Anthropometric Correlation for Virtual Population Modelling

    DEFF Research Database (Denmark)

    Rasmussen, John; Waagepetersen, Rasmus Plenge; Rasmussen, Kasper Pihl

    2018-01-01

    , and therefore the correlations between parameters, are not accessible. This problem is solved by projecting correlation from a data set for which raw data are provided. The method is tested and validated by generation of pseudo females from males in the ANSUR anthropometric dataset. Results show...

  20. K basin sandfilter backwash line characterization project, analytical results for campaign 15

    International Nuclear Information System (INIS)

    Steen, F.H.

    1999-01-01

    Sample 183KWBMF was taken from the K West Sandfilter Backwash Pit on August 28, 1998 and received by 222-S Laboratory on August 28, 1998. Analyses were performed in accordance with ''Letter of Instruction for K Basins Sandfilter Backwash Line Samples'' (LOI) in support of the K Basin Sandfilter Backwash Line Characterization Project

  1. Kvanefjeld uranium project

    International Nuclear Information System (INIS)

    Erlendsson, G.; Jensen, J.; Kofoed, S.; Paulsen, J.L.

    1983-11-01

    The draft uranium project ''Kvanefjeld'' describes the establishment and operation of an industrial plant for exploiting the uranium deposit at Kvanefjeld. The draft project is part of the overall pre-feasibility project and is based on its results. The draft project includes two alternative locations for the processing plant and the tailings deposit plant. The ore reserve is estimated at 56 million tons with an average content of 365 PPM. The mine will be established as an open pit, with a slope angle of 55deg. Conventional techniques are used in drilling, blasting and handling the ore. Waste rock with no uranium content will be disposed of in two ponds near the mine. The waste rock volume is estimated at 80 million tons. A processing plant for extracting uranium from the ore will be established. The technical layout of the plant is based on the extraction experiments performed at Risoe from 1981-83. Yearly capacity is 4.2 million tons of ore. Electrical energy will be supplied from a hydroelectric station to be built at Johan Dahl Land. Thermal energy (steam/heat) will be supplied from a coal-fired district heating plant to be built in connection with the processing plant. Expected power consumption is estimated at 225 GWh/year. Heat consumption is of the same order. In the third year the plant is expected to operate at full capacity. Operating costs will be Dkr. 121/ton of ore from years 1 through 7. Consumption of chemicals will be reduced from the 7th year, and operating costs will consequently drop to Dkr. 115/ton of ore. Calculations show that industrial extraction of the uranium deposit in Kvanefjeld is economically advantageous. In addition, the economy of the project is expected to improve by extracting byproducts from the ore. (EG)

  2. [Strategies for improving care of oncologic patients: SHARE Project results].

    Science.gov (United States)

    Reñones Crego, María de la Concepción; Fernández Pérez, Dolores; Vena Fernández, Carmen; Zamudio Sánchez, Antonio

    2016-01-01

    Cancer treatment is a major burden for the patient and its family that requires an individualized management by healthcare professionals. Nurses are in charge of coordinating care and are the closest healthcare professionals to patient and family; however, in Spain, there are not standard protocols yet for the management of oncology patients. The Spanish Oncology Nursing Society developed between 2012 and 2014 the SHARE project, with the aim of establishing strategies to improve quality of life and nursing care in oncology patients. It was developed in 3 phases. First, a literature search and review was performed to identify nursing strategies, interventions and tools to improve cancer patients' care. At the second stage, these interventions were agreed within a group of oncology nursing experts; and at the third phase, a different group of experts in oncology care categorized the interventions to identify the ones with highest priority and most feasible to be implemented. As a result, 3 strategic actions were identified to improve nursing care during cancer treatment: To provide a named nurse to carry out the follow up process by attending to the clinic or telephonic consultation, develop therapeutic education with adapted protocols for each tumor type and treatment and ensure specific training for nurses on the management of the cancer patients. Strategic actions proposed in this paper aim to improve cancer patients' healthcare and quality of life through the development of advanced nursing roles based on a higher level of autonomy, situating nurses as care coordinators to assure an holistic care in oncology patients. Copyright © 2016 Elsevier España, S.L.U. All rights reserved.

  3. Recent results and performance of the multi-gap resistive plate chambers network for the EEE Project

    Science.gov (United States)

    Abbrescia, M.; Avanzini, C.; Baldini, L.; Baldini Ferroli, R.; Batignani, G.; Bencivenni, G.; Bossini, E.; Chiavassa, A.; Cicalò, C.; Cifarelli, L.; Coccia, E.; Corvaglia, A.; De Gruttola, D.; De Pasquale, S.; Di Giovanni, A.; D`Incecco, M.; Dreucci, M.; Fabbri, F. L.; Fattibene, E.; Ferraro, A.; Frolov, V.; Galeotti, P.; Garbini, M.; Gemme, G.; Gnesi, I.; Grazzi, S.; Gustavino, C.; Hatzifotiadou, D.; La Rocca, P.; Licciulli, F.; Maggiora, A.; Maragoto Rodriguez, O.; Maron, G.; Martelli, B.; Mazziotta, M. N.; Miozzi, S.; Nania, R.; Noferini, F.; Nozzoli, F.; Panareo, M.; Panetta, M. P.; Paoletti, R.; Park, W.; Perasso, L.; Pilo, F.; Piragino, G.; Riggi, F.; Righini, G. C.; Sartorelli, G.; Scapparone, E.; Schioppa, M.; Scribano, A.; Selvi, M.; Serci, S.; Siddi, E.; Squarcia, S.; Stori, L.; Taiuti, M.; Terreni, G.; Visnyei, O. B.; Vistoli, M. C.; Votano, L.; Williams, M. C. S.; Zani, S.; Zichichi, A.; Zuyeusky, R.

    2016-11-01

    The Extreme Energy Events (EEE) Project is devoted to the study of Extensive Atmospheric Showers through a network of muon telescopes, installed in High Schools, with the further aim of introducing young students to particle and astroparticle physics. Each telescope is a tracking detector composed of three Multi-gap Resistive Plate Chambers (MRPC) with an active area of 1.60 × 0.80 m2. Their characteristics are similar to the ones built for the Time Of Flight array of the ALICE Experimentat LHC . The EEE Project started with a few pilot towns, where the telescopes have been taking data since 2008, and it has been constantly extended, reaching at present more than 50 MRPCs telescopes. They are spread across Italy with two additional stations at CERN, covering an area of around 3 × 105 km2, with a total surface area for all the MRPCs of 190 m2. A comprehensive description of the MRPCs network is reported here: efficiency, time and spatial resolution measured using cosmic rays hitting the telescopes. The most recent results on the detector and physics performance from a series of coordinated data acquisition periods are also presented.

  4. Lake Charles CCS Project

    Energy Technology Data Exchange (ETDEWEB)

    Leib, Thomas [Leucadia Energy, LLC, Salt Lake City, UT (United States); Cole, Dan [Denbury Onshore, LLC, Plano, TX (United States)

    2015-06-30

    In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture and Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO2) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO2 generated in a large industrial gasification process and sequester the CO2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials

  5. Large-Scale Features of Pliocene Climate: Results from the Pliocene Model Intercomparison Project

    Science.gov (United States)

    Haywood, A. M.; Hill, D.J.; Dolan, A. M.; Otto-Bliesner, B. L.; Bragg, F.; Chan, W.-L.; Chandler, M. A.; Contoux, C.; Dowsett, H. J.; Jost, A.; hide

    2013-01-01

    Climate and environments of the mid-Pliocene warm period (3.264 to 3.025 Ma) have been extensively studied.Whilst numerical models have shed light on the nature of climate at the time, uncertainties in their predictions have not been systematically examined. The Pliocene Model Intercomparison Project quantifies uncertainties in model outputs through a coordinated multi-model and multi-mode data intercomparison. Whilst commonalities in model outputs for the Pliocene are clearly evident, we show substantial variation in the sensitivity of models to the implementation of Pliocene boundary conditions. Models appear able to reproduce many regional changes in temperature reconstructed from geological proxies. However, data model comparison highlights that models potentially underestimate polar amplification. To assert this conclusion with greater confidence, limitations in the time-averaged proxy data currently available must be addressed. Furthermore, sensitivity tests exploring the known unknowns in modelling Pliocene climate specifically relevant to the high latitudes are essential (e.g. palaeogeography, gateways, orbital forcing and trace gasses). Estimates of longer-term sensitivity to CO2 (also known as Earth System Sensitivity; ESS), support previous work suggesting that ESS is greater than Climate Sensitivity (CS), and suggest that the ratio of ESS to CS is between 1 and 2, with a "best" estimate of 1.5.

  6. Project and Sports Events Management

    OpenAIRE

    Sebastian Madalin MUNTEANU

    2011-01-01

    This paper tries to capture the importance it holds the project management in socio-cultural sector which stands out when we refer to the sport. So when we talk about project management in sport, to consider a much larger vision, a new project management perspective, they involve a responsibility for the implementation of an event with global impact on very long term. Sports projects, as history shows us, played a significant role in developing societies. Also, all major sports industry proje...

  7. K Basin sandfilter backwash line characterization project, analytical results for Campaign 20

    International Nuclear Information System (INIS)

    STEEN, F.H.

    1999-01-01

    Sample 112KWBMF was taken from the K West Sandfilter Backwash Pit on June 1 , 1999, and received by 222-S Laboratory on June 2,1999. Analyses were performed on sample 112KWBMF in accordance with Letter of Instruction for K Basins Sandfilter Backwash Line Samples (LOI) in support of the K Basin Sandfilter Backwash Line Characterization Project

  8. Uncertainty in project phases: A framework for organisational change management

    DEFF Research Database (Denmark)

    Kreye, Melanie; Balangalibun, Sarah

    2015-01-01

    in the early stage of the change project but was delayed until later phases. Furthermore, the sources of uncertainty were found to be predominantly within the organisation that initiated the change project and connected to the project scope. Based on these findings, propositions for future research are defined......Uncertainty is an integral challenge when managing organisational change projects (OCPs). Current literature highlights the importance of uncertainty; however, falls short of giving insights into the nature of uncertainty and suggestions for managing it. Specifically, no insights exist on how...... uncertainty develops over the different phases of OCPs. This paper presents case-based evidence on different sources of uncertainty in OCPs and how these develop over the different project phases. The results showed some surprising findings as the majority of the uncertainty did not manifest itself...

  9. Reflecting socio-technical combinations in radioactive waste management. Results from the InSOTEC European research project

    International Nuclear Information System (INIS)

    Kallenbach-Herbert, Beate; Bergmans, Anne; Martell, Meritxell; Schroeder, Jantine

    2015-01-01

    InSOTEC is a three-year collaborative social sciences research project funded under the European Atomic Energy Community's 7th Framework Programme FP7. The project aims to generate a better understanding of the complex interplay between the technical and the social in the context of geological disposal of radioactive waste. In doing so, InSOTEC has moved beyond the social and technical division that is frequently being found in this context by - investigating the consideration of social sciences and the recognition of socio-technical combinations in research programs on geological disposal, - analyzing the socio-technical entanglement in selected contexts like siting, reversibility and retrievability, demonstrating safety and technology transfer on the basis of case studies, and - exploring the integration of diverse stakeholders in technology oriented networks. The analyses reveal that activities in the context of geological disposal, whether related to research, planning, siting etc., rather support the divide of social and technical aspects than fostering the consideration of their entanglement. Reasons identified for this are manifold. The wish to reduce complexity by focusing stakeholder involvement on social questions and fixing the technical part ''when acceptance is reached'' is only one of them. However, the analyses also show that over the long timescales of repository planning and implementation, robust management strategies must provide the flexibility to adapt to both technical and social developments and demands. Understanding the socio-technical interplay and creating structures for its consideration provides the basis for dealing with this challenge. This presentation will focus on the main findings of the InSOTEC project with regard to the consideration of socio-technical combinations in practice. These insights are currently under development and will be finalized at the end of the project in June 2014. We will reflect on

  10. Reflecting socio-technical combinations in radioactive waste management. Results from the InSOTEC European research project

    Energy Technology Data Exchange (ETDEWEB)

    Kallenbach-Herbert, Beate [Oeko-Institut e.V., Darmstadt (Germany); Bergmans, Anne [Antwerp Univ. (Belgium); Martell, Meritxell [Merience Strategic Thinking, Olerdola (Spain); Schroeder, Jantine [Antwerp Univ. (Belgium); SCK - CEN, Mol (Belgium)

    2015-07-01

    InSOTEC is a three-year collaborative social sciences research project funded under the European Atomic Energy Community's 7th Framework Programme FP7. The project aims to generate a better understanding of the complex interplay between the technical and the social in the context of geological disposal of radioactive waste. In doing so, InSOTEC has moved beyond the social and technical division that is frequently being found in this context by - investigating the consideration of social sciences and the recognition of socio-technical combinations in research programs on geological disposal, - analyzing the socio-technical entanglement in selected contexts like siting, reversibility and retrievability, demonstrating safety and technology transfer on the basis of case studies, and - exploring the integration of diverse stakeholders in technology oriented networks. The analyses reveal that activities in the context of geological disposal, whether related to research, planning, siting etc., rather support the divide of social and technical aspects than fostering the consideration of their entanglement. Reasons identified for this are manifold. The wish to reduce complexity by focusing stakeholder involvement on social questions and fixing the technical part ''when acceptance is reached'' is only one of them. However, the analyses also show that over the long timescales of repository planning and implementation, robust management strategies must provide the flexibility to adapt to both technical and social developments and demands. Understanding the socio-technical interplay and creating structures for its consideration provides the basis for dealing with this challenge. This presentation will focus on the main findings of the InSOTEC project with regard to the consideration of socio-technical combinations in practice. These insights are currently under development and will be finalized at the end of the project in June 2014. We will reflect on

  11. Information dissemination and training: two key issues for consolidating and strengthening the results of health telematic projects.

    Science.gov (United States)

    Arcarese, T; Boi, S; Gagliardi, R

    2000-01-01

    The concepts expressed in this paper concerns the activities to be developed within HEALTHLINE, a European project under the Telematics Application programme. HEALTHLINE is an umbrella project which takes initiatives and provides links to other international projects on health telematics. The projects involved are NIVEMES and RISE; they represent the starting point from which a common approach will be developed. The experience gained from these projects has highlighted two emerging requirements: information dissemination and training. To fulfil the needs of information, an Internet corner will be set up; it will allow citizens and health professionals to find and exchange information as well as to discuss themes concerning health care. Due to the most advanced technologies recently introduced, the Health care sector has had to modify its traditional ways of working to aid professionals in exploiting new training techniques and Health Care provision methods. HEALTHLINE will focus on training and on the development of the use of new tools and services. Furthermore, the project will exploit the training methodologies based on multimedia technology for developing training-on-the-job modules. The entire system, in its final stage, will consist of a network for co-operating training and information dissemination; European sites in the project will share information, training material and provide education and information on tele-health, medical and health-care issues to health care providers, beneficiaries and the general public.

  12. Project management for profit a failsafe guide to keeping projects on track and on budget

    CERN Document Server

    Knight, Joe; Angus, Brad; Case, John

    2012-01-01

    If your work involves projects, then this book is for you. It will show every company owner and project manager—at businesses large and small—how to run projects differently. You’ll benefit if you’ve ever: • been over budget on a project • exceeded a timeline on a project • worked on a project that completely stalled as you neared the finish line • lost money on a sure-thing project and had no idea why • noticed that scope and feature creep held you back • watched a project take three times as long as planned • felt too embarrassed to perform a review of your successes and failures • wondered whether your project actually made any money By the time you finish the book, you’ll be ready to implement Project Management for Profit in your own company—and be prepared to keep your projects on track and on budget.

  13. Uncertainty Analyses for Back Projection Methods

    Science.gov (United States)

    Zeng, H.; Wei, S.; Wu, W.

    2017-12-01

    So far few comprehensive error analyses for back projection methods have been conducted, although it is evident that high frequency seismic waves can be easily affected by earthquake depth, focal mechanisms and the Earth's 3D structures. Here we perform 1D and 3D synthetic tests for two back projection methods, MUltiple SIgnal Classification (MUSIC) (Meng et al., 2011) and Compressive Sensing (CS) (Yao et al., 2011). We generate synthetics for both point sources and finite rupture sources with different depths, focal mechanisms, as well as 1D and 3D structures in the source region. The 3D synthetics are generated through a hybrid scheme of Direct Solution Method and Spectral Element Method. Then we back project the synthetic data using MUSIC and CS. The synthetic tests show that the depth phases can be back projected as artificial sources both in space and time. For instance, for a source depth of 10km, back projection gives a strong signal 8km away from the true source. Such bias increases with depth, e.g., the error of horizontal location could be larger than 20km for a depth of 40km. If the array is located around the nodal direction of direct P-waves the teleseismic P-waves are dominated by the depth phases. Therefore, back projections are actually imaging the reflection points of depth phases more than the rupture front. Besides depth phases, the strong and long lasted coda waves due to 3D effects near trench can lead to additional complexities tested here. The strength contrast of different frequency contents in the rupture models also produces some variations to the back projection results. In the synthetic tests, MUSIC and CS derive consistent results. While MUSIC is more computationally efficient, CS works better for sparse arrays. In summary, our analyses indicate that the impact of various factors mentioned above should be taken into consideration when interpreting back projection images, before we can use them to infer the earthquake rupture physics.

  14. Demons Registration of CT Volume and CBCT Projections for Adaptive Radiotherapy: Avoiding CBCT Reconstruction

    DEFF Research Database (Denmark)

    Bjerre, Troels; Aznar, M.; Munck af Rosenschöld, P.

    2012-01-01

    with adaptive fluidity (smoothing kernel width). For forward/back-projection, the separable footprints algorithm with trapezoid functions was applied. The similarity between the simulated and measured projections was measured as the SSD. Results: The figure shows a slice of; the CT volume (reference), the CT...

  15. Introduction of a prehospital critical incident monitoring system--pilot project results.

    Science.gov (United States)

    Stella, Julian; Davis, Anna; Jennings, Paul; Bartley, Bruce

    2008-01-01

    Hospital medical incident monitoring improves preventable morbidity and mortality rates. Error management systems have been adopted widely in this setting. Data relating to incident monitoring in the prehospital setting is limited. Implementation of an incident monitoring process in a prehospital setting. This is a prospective, descriptive study of the pilot phase of the implementation of an incident monitoring process in a regional prehospital setting, with a focus on trauma care. Paramedics and emergency department staff submitted anonymous incident reports, and a chart review was performed on patients who met major trauma criteria. Selected trauma cases were analyzed by a structured interview/debriefing process to elucidate undocumented incidents. A project committee coded and logged all incidents and developed recommendations. Of 4,429 ambulance responses, 41 cases were analyzed. Twenty-four (58.5%; 95% CI = 49.7-67.4%) were reported anonymously, and the rest were major trauma patients. A total of 77 incidents were identified (mean per case = 1.8; CI = 1.03-2.57). Anonymous cases revealed 26 incidents (mean = 1.1; CI = 0.98-1.22); eight trauma debriefings revealed 38 incidents (mean = 4.8; CI = 0.91-8.69) and nine trauma chart reviews revealed 13 incidents (mean = 1.6; CI = 1.04-2.16). A total of 56 of 77 (72.7%; CI = 65.5-80.0%) incidents related to system inadequacies, and 15 (57.7%; CI = 46.7-68.6%) anonymously reported incidents related to resource problems. A total of 35 of 77 (45.5%; CI = 40.4-50.5%) incidents had minimal or no impact on the patients' outcomes. Thirty-four of 77 (44.2%; CI = 39.3-49.1%) incidents were considered mitigated by circumstance. Incident monitoring led to generalized feedback in most cases (65 of 77; 84.4%; CI = 77.6-91.3%); in three cases (3.9%; CI = 3.7-4.1%), specific education occurred; two cases were reported to an external body (2.6%; CI = 2.5-2.7%); three cases resulted in remedial action (3.9%; CI = 3.7-4.1%); four for

  16. Results of the scientific and humanitarian projects supported by the German electricity companies (VDEW e.V.) after the Chernobyl accident

    International Nuclear Information System (INIS)

    Pfob, H.; Heinemann, G.

    2000-01-01

    The German Electricity Companies, organized by VDEW e.V., tried to support in manifold ways the areas and people affected by the Chernobyl accident in their management of the situation. Apart from their prompting numerous help projects of the German public; we must mention three efforts especially: 1. the program for partnership in security matters initiated by the German nuclear power plants has been serving a quick and efficient support of the Eastern European plants since 1990- parallel to the efforts on a European level (strategic exchange of views of the experts concerned, consultation and training on the management level, optimization of training programs). 2: the project [Scientists Help Chernobyl Children] of the Joint Committee for Radiation Research (GAST), an union of the scientific societies working on radiation research in Germany under the chairmanship of Prof. Reiners (Essen/Wuerzburg) in cooperation with Prof. Streffer (Essen), Dr. Parezke (Munich), Dr. Heinemann (Hannover) and Dr. Pfob (Karlsruhe), aims to give humanitarian and scientific help for children ill with thyroid cancer in Belarus. Therapy and training, molecular biological examinations, dosimetry, and risk evaluation, as well as consultation and coordination in Minsk are parts of the project. 3: the project of the Radiation Cytogenetics Association (RCA) under the chairmanship of Prof. Bauchinger (GSF Muenchen) has been giving coordinated help with biological dosimetry to institutions and scientist in the states of the former USSR. Through retrospective biological dosimetry, especially the employment of the FISH (fluorescence in situ hybridization)-technology for the assessment of so-called stable translocations, both individual and population doses were analyzed. All three of these projects, even if to a different extent, have been leading to new and unique results up to the present day. Especially the GAST-project has been marked to a high extent by its humanitarian help for the

  17. Leadership and Project Success in Development Sector

    Directory of Open Access Journals (Sweden)

    Saghir Ahmed

    2017-10-01

    Full Text Available Aim/purpose - The study aims to investigate the relationship among the leadership, operational efficiency and project success in general and the impact of transformational leadership and operational efficiency on project success in particular. Design/methodology/approach - Mean comparison from descriptive statistics and multiple linear regression from inferential statistics was used to determine the association between variables and further impact of the transformational leadership and operational efficiency on project success in the development sector. The paper presents the results of a survey conducted among 200 employees from the top, middle & lower management levels of various national & international development organizations working in Pakistan like Microfinance Banks and other Rural Support Programs. Statistical Package for Social Sciences (SPSS was used to process data. Findings - The result shows positive association among transformational leadership, operational efficiency and project success. In addition, it was found that transformational leadership and operational efficiency have a positive and statistically significant impact on the project success. It is concluded that both transformational leadership and operational efficiency are vital to achieving the optimum level of success in any project, especially in the development sector. Research implications/limitations - The integral limitation of the study was the respondents because most of the development organizations have their operations in rural areas where access was difficult because of limited time and resources. In addition, such organizations are always reluctant to provide survey feedback. Originality/value/contribution - The paper contribution is in the theoretical and practical knowledge of the project success factors in the development sector which is still a somehow unexplored area. Regulators of the development sector may be benefited from this study.

  18. Watchdog Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories, Inc., Pullman, WA (United States); Campbell, Jack [CenterPoint Energy Houston Electric, TX (United States); Hadley, Mark [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-12-30

    The Watchdog Project completed 100% of the project Statement of Project Objective (SOPO). The Watchdog project was a very aggressive project looking to accomplish commercialization of technology that had never been commercialized, as a result it took six years to complete not the original three that were planned. No additional federal funds were requested from the original proposal and SEL contributed the additional cost share required to complete the project. The result of the Watchdog Project is the world’s first industrial rated Software Defined Network (SDN) switch commercially available. This technology achieved the SOPOO and DOE Roadmap goals to have strong network access control, improve reliability and network performance, and give the asset owner the ability to minimize attack surface before and during an attack. The Watchdog project is an alliance between CenterPoint Energy Houston Electric, Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. PNNL performs basic and applied research to deliver energy, environmental, and national security for our nation. CenterPoint Energy is the third largest publicly traded natural gas delivery company in the U.S and third largest combined electricity and natural gas delivery company. The Watchdog Project efforts were combined with the SDN Project efforts to produce the entire SDN system solution for the critical infrastructure. The Watchdog project addresses Topic Area of Interest 5: Secure Communications, for the DEFOA- 0000359 by protecting the control system local area network itself and the communications coming from and going to the electronic devices on the local network. Local area networks usually are not routed and have little or no filtering capabilities. Combine this with the fact control system protocols are designed with inherent trust the control

  19. SAR focusing of P-band ice sounding data using back-projection

    DEFF Research Database (Denmark)

    Kusk, Anders; Dall, Jørgen

    2010-01-01

    accommodated at the expense of computation time. The back-projection algorithm can be easily parallelized however, and can advantageously be implemented on a graphics processing unit (GPU). Results from using the back-projection algorithm on POLARIS ice sounder data from North Greenland shows that the quality...... of data is improved by the processing, and the performance of the GPU implementation allows for very fast focusing....

  20. SharePoint 2010 for Project Management

    CERN Document Server

    Sy, Dux

    2012-01-01

    If you were to analyze your team's performance on a typical project, you'd be surprised how much time is wasted on non-productive tasks. This hands-on guide shows you how to work more efficiently by organizing and managing projects with SharePoint 2010. You'll learn how to build a Project Management Information System (PMIS), customized to your project, that can effectively coordinate communication and collaboration among team members. Written by a certified Project Management Professional (PMP) and Microsoft SharePoint MVP with 15 years of IT project management experience, each chapter incl

  1. Histological identification of phrenic afferent projections to the spinal cord.

    Science.gov (United States)

    Nair, Jayakrishnan; Bezdudnaya, Tatiana; Zholudeva, Lyandysha V; Detloff, Megan R; Reier, Paul J; Lane, Michael A; Fuller, David D

    2017-02-01

    Limited data are available regarding the spinal projections of afferent fibers in the phrenic nerve. We describe a method that robustly labels phrenic afferent spinal projections in adult rats. The proximal end of the cut phrenic nerve was secured in a microtube filled with a transganglionic tracer (cholera toxin β-subunit, CT-β, or Cascade Blue) and tissues harvested 96-h later. Robust CT-β labeling occurred in C3-C5 dorsal root ganglia cell bodies and phrenic afferent projections were identified in the mid-cervical dorsal horn (laminae I-III), intermediate grey matter (laminae IV, VII) and near the central canal (laminae X). Afferent fiber labeling was reduced or absent when CT-β was delivered to the intrapleural space or directly to the hemidiaphragm. Soaking the phrenic nerve with Cascade Blue also produced robust labeling of mid-cervical dorsal root ganglia cells bodies, and primary afferent fibers were observed in spinal grey matter and dorsal white matter. Our results show that the 'nerve soak' method effectively labels both phrenic motoneurons and phrenic afferent projections, and show that primary afferents project throughout the ipsilateral mid-cervical gray matter. Copyright © 2016. Published by Elsevier B.V.

  2. The Effectiveness of Project Based Learning in Trigonometry

    Science.gov (United States)

    Gerhana, M. T. C.; Mardiyana, M.; Pramudya, I.

    2017-09-01

    This research aimed to explore the effectiveness of Project-Based Learning (PjBL) with scientific approach viewed from interpersonal intelligence toward students’ achievement learning in mathematics. This research employed quasi experimental research. The subjects of this research were grade X MIPA students in Sleman Yogyakarta. The result of the research showed that project-based learning model is more effective to generate students’ mathematics learning achievement that classical model with scientific approach. This is because in PjBL model students are more able to think actively and creatively. Students are faced with a pleasant atmosphere to solve a problem in everyday life. The use of project-based learning model is expected to be the choice of teachers to improve mathematics education.

  3. Scaffolding Project-Based Learning with the Project Management Body of Knowledge (PMBOK[R])

    Science.gov (United States)

    van Rooij, Shahron Williams

    2009-01-01

    This paper reports the results of a study of the extent to which processes and procedures from the discipline of project management can scaffold online project-based learning in a graduate-level instructional technology course, by facilitating intra-team interaction, enhancing project outcomes and promoting a positive project team experience. With…

  4. Identification of High Confidence Nuclear Forensics Signatures. Results of a Coordinated Research Project and Related Research

    International Nuclear Information System (INIS)

    2017-08-01

    The results of a Coordinated Research Project and related research on the identification of high confidence nuclear forensic isotopic, chemical and physical data characteristics, or signatures, provides information on signatures that can help identify the origin and history of nuclear and other radioactive material encountered out of regulatory control. This research report compiles findings from investigations of materials obtained from throughout the nuclear fuel cycle to include radioactive sources. The report further provides recent results used to identify, analyse in the laboratory, predict and interpret these signatures relative to the requirements of a nuclear forensics examination. The report describes some of the controls on the incorporation and persistence of these signatures in these materials as well as their potential use in a national system of identification to include a national nuclear forensics library.

  5. A Methodology for Virtual Enterprise Management – Results from IMS 95001/Esprit 26509 Globeman21 project

    DEFF Research Database (Denmark)

    Tølle, Martin; Vesterager, Johan; Pedersen, Jens Dahl

    2000-01-01

    This paper presents results of the recently concluded IMS Globeman21 (Global Manufacturing in the 21st Century, IMS 95001/ESPRIT 26509) project. The results is the Virtual Enterprise Concept, a Virtual Enterprise Framework based upon GERAM (ISO/DIS 15704) and a Methodology for Virtual Enterprise...... management and engineering which is related to the Virtual Enterprise Framework (VEF). Applying the VEF as a basis structure for the Methodology provides a systematic approach for preparation and engineering of virtual enterprises. The Virtual Enterprise Framework opens up the prospect of combining...... experiences in the area of virtual enterprise into an integrated whole enabling researchers or practitioners to focus on subsets of the challenge related to the realisation of the virtual enterprise potentials. In this paper the identification, concept and requirements phases of the methodology are briefly...

  6. MORE. Management of Requirements in NPP modernisation projects - Project report 2005

    International Nuclear Information System (INIS)

    Thunem, A.P.J.; Fredriksen, R.; Thunem, H.P.J.; Ventae, O.; Valkonen, J.; Holmberg, J.E.

    2006-04-01

    The overall objective of the project MORE is to improve the means for managing the large amounts of evolving requirements in Nordic NPP modernisation projects. In accordance to this objective, the activity will facilitate the industrial utilisation of the research results from the project TACO. On the basis of experiences in the Nordic countries, the overall aim of the TACO project has been to identify the best practices and most important criteria for ensuring effective communication in relation to requirements elicitation and analysis, understandability of requirements to all parties, and traceability of requirements. The project resulted in the development of a traceability model for handling requirements from their origins and through their final shapes. Particular emphasis for the MORE project in 2005 was put on utilising a prototype of a tool (TRACE) intended to support an adopted approach to dependable requirements engineering, suitable for modelling and handling large amounts of requirements related to all stages of the systems development process and not only those traditionally including requirements at high-level stages. (au)

  7. MORE. Management of Requirements in NPP modernisation projects - Project report 2005

    Energy Technology Data Exchange (ETDEWEB)

    Thunem, A.P.J.; Fredriksen, R.; Thunem, H.P.J. [IFE (Norway); Ventae, O.; Valkonen, J.; Holmberg, J.E. [VTT Technical Research Centre of Finland (Finland)

    2006-04-15

    The overall objective of the project MORE is to improve the means for managing the large amounts of evolving requirements in Nordic NPP modernisation projects. In accordance to this objective, the activity will facilitate the industrial utilisation of the research results from the project TACO. On the basis of experiences in the Nordic countries, the overall aim of the TACO project has been to identify the best practices and most important criteria for ensuring effective communication in relation to requirements elicitation and analysis, understandability of requirements to all parties, and traceability of requirements. The project resulted in the development of a traceability model for handling requirements from their origins and through their final shapes. Particular emphasis for the MORE project in 2005 was put on utilising a prototype of a tool (TRACE) intended to support an adopted approach to dependable requirements engineering, suitable for modelling and handling large amounts of requirements related to all stages of the systems development process and not only those traditionally including requirements at high-level stages. (au)

  8. From the Paper to the Tablet: On the Design of an AR-Based Tool for the Inspection of Pre-Fab Buildings. Preliminary Results of the SIRAE Project

    Science.gov (United States)

    Fernández, Marcos; Poza, Montse

    2018-01-01

    Energy-efficient Buildings (EeB) are demanded in today’s constructions, fulfilling the requirements for green cities. Pre-fab buildings, which are modularly fully-built in factories, are a good example of this. Although this kind of building is quite new, the in situ inspection is documented using traditional tools, mainly based on paper annotations. Thus, the inspection process is not taking advantage of new technologies. In this paper, we present the preliminary results of the SIRAE project that aims to provide an Augmented Reality (AR) tool that can seamlessly aid in the regular processes of pre-fab building inspections to detect and eliminate the possible existing quality and energy efficiency deviations. In this regards, we show a description of the current inspection process and how an interactive tool can be designed and adapted to it. Our first results show the design and implementation of our tool, which is highly interactive and involves AR visualizations and 3D data-gathering, allowing the inspectors to quickly manage it without altering the way the inspection process is done. First trials on a real environment show that the tool is promising for massive inspection processes. PMID:29671799

  9. From the Paper to the Tablet: On the Design of an AR-Based Tool for the Inspection of Pre-Fab Buildings. Preliminary Results of the SIRAE Project.

    Science.gov (United States)

    Portalés, Cristina; Casas, Sergio; Gimeno, Jesús; Fernández, Marcos; Poza, Montse

    2018-04-19

    Energy-efficient Buildings (EeB) are demanded in today’s constructions, fulfilling the requirements for green cities. Pre-fab buildings, which are modularly fully-built in factories, are a good example of this. Although this kind of building is quite new, the in situ inspection is documented using traditional tools, mainly based on paper annotations. Thus, the inspection process is not taking advantage of new technologies. In this paper, we present the preliminary results of the SIRAE project that aims to provide an Augmented Reality (AR) tool that can seamlessly aid in the regular processes of pre-fab building inspections to detect and eliminate the possible existing quality and energy efficiency deviations. In this regards, we show a description of the current inspection process and how an interactive tool can be designed and adapted to it. Our first results show the design and implementation of our tool, which is highly interactive and involves AR visualizations and 3D data-gathering, allowing the inspectors to quickly manage it without altering the way the inspection process is done. First trials on a real environment show that the tool is promising for massive inspection processes.

  10. An ex ante control chart for project monitoring using earned duration management observations

    Science.gov (United States)

    Mortaji, Seyed Taha Hossein; Noori, Siamak; Noorossana, Rassoul; Bagherpour, Morteza

    2017-12-01

    In the past few years, there has been an increasing interest in developing project control systems. The primary purpose of such systems is to indicate whether the actual performance is consistent with the baseline and to produce a signal in the case of non-compliance. Recently, researchers have shown an increased interest in monitoring project's performance indicators, by plotting them on the Shewhart-type control charts over time. However, these control charts are fundamentally designed for processes and ignore project-specific dynamics, which can lead to weak results and misleading interpretations. By paying close attention to the project baseline schedule and using statistical foundations, this paper proposes a new ex ante control chart which discriminates between acceptable (as-planned) and non-acceptable (not-as-planned) variations of the project's schedule performance. Such control chart enables project managers to set more realistic thresholds leading to a better decision making for taking corrective and/or preventive actions. For the sake of clarity, an illustrative example has been presented to show how the ex ante control chart is constructed in practice. Furthermore, an experimental investigation has been set up to analyze the performance of the proposed control chart. As expected, the results confirm that, when a project starts to deflect significantly from the project's baseline schedule, the ex ante control chart shows a respectable ability to detect and report right signals while avoiding false alarms.

  11. ORGANIZATION OF FUTURE ENGINEERS' PROJECT-BASED LEARNING WHEN STUDYING THE PROJECT MANAGEMENT METHODOLOGY

    Directory of Open Access Journals (Sweden)

    Halyna V. Lutsenko

    2015-02-01

    Full Text Available The peculiarities of modern world experience of implementation of project-based learning in engineering education have been considered. The potential role and place of projects in learning activity have been analyzed. The methodology of organization of project-based activity of engineering students when studying the project management methodology and computer systems of project management has been proposed. The requirements to documentation and actual results of students' projects have been described in detail. The requirements to computer-aided systems of project management developed by using Microsoft Project in the scope of diary scheduling and resources planning have been formulated.

  12. Projected quasiparticle theory for molecular electronic structure

    Science.gov (United States)

    Scuseria, Gustavo E.; Jiménez-Hoyos, Carlos A.; Henderson, Thomas M.; Samanta, Kousik; Ellis, Jason K.

    2011-09-01

    We derive and implement symmetry-projected Hartree-Fock-Bogoliubov (HFB) equations and apply them to the molecular electronic structure problem. All symmetries (particle number, spin, spatial, and complex conjugation) are deliberately broken and restored in a self-consistent variation-after-projection approach. We show that the resulting method yields a comprehensive black-box treatment of static correlations with effective one-electron (mean-field) computational cost. The ensuing wave function is of multireference character and permeates the entire Hilbert space of the problem. The energy expression is different from regular HFB theory but remains a functional of an independent quasiparticle density matrix. All reduced density matrices are expressible as an integration of transition density matrices over a gauge grid. We present several proof-of-principle examples demonstrating the compelling power of projected quasiparticle theory for quantum chemistry.

  13. The Texas medication algorithm project: clinical results for schizophrenia.

    Science.gov (United States)

    Miller, Alexander L; Crismon, M Lynn; Rush, A John; Chiles, John; Kashner, T Michael; Toprac, Marcia; Carmody, Thomas; Biggs, Melanie; Shores-Wilson, Kathy; Chiles, Judith; Witte, Brad; Bow-Thomas, Christine; Velligan, Dawn I; Trivedi, Madhukar; Suppes, Trisha; Shon, Steven

    2004-01-01

    In the Texas Medication Algorithm Project (TMAP), patients were given algorithm-guided treatment (ALGO) or treatment as usual (TAU). The ALGO intervention included a clinical coordinator to assist the physicians and administer a patient and family education program. The primary comparison in the schizophrenia module of TMAP was between patients seen in clinics in which ALGO was used (n = 165) and patients seen in clinics in which no algorithms were used (n = 144). A third group of patients, seen in clinics using an algorithm for bipolar or major depressive disorder but not for schizophrenia, was also studied (n = 156). The ALGO group had modestly greater improvement in symptoms (Brief Psychiatric Rating Scale) during the first quarter of treatment. The TAU group caught up by the end of 12 months. Cognitive functions were more improved in ALGO than in TAU at 3 months, and this difference was greater at 9 months (the final cognitive assessment). In secondary comparisons of ALGO with the second TAU group, the greater improvement in cognitive functioning was again noted, but the initial symptom difference was not significant.

  14. The Satellite based Monitoring Initiative for Regional Air quality (SAMIRA): Project summary and first results

    Science.gov (United States)

    Schneider, Philipp; Stebel, Kerstin; Ajtai, Nicolae; Diamandi, Andrei; Horalek, Jan; Nemuc, Anca; Stachlewska, Iwona; Zehner, Claus

    2017-04-01

    We present a summary and some first results of a new ESA-funded project entitled Satellite based Monitoring Initiative for Regional Air quality (SAMIRA), which aims at improving regional and local air quality monitoring through synergetic use of data from present and upcoming satellite instruments, traditionally used in situ air quality monitoring networks and output from chemical transport models. Through collaborative efforts in four countries, namely Romania, Poland, the Czech Republic and Norway, all with existing air quality problems, SAMIRA intends to support the involved institutions and associated users in their national monitoring and reporting mandates as well as to generate novel research in this area. The primary goal of SAMIRA is to demonstrate the usefulness of existing and future satellite products of air quality for improving monitoring and mapping of air pollution at the regional scale. A total of six core activities are being carried out in order to achieve this goal: Firstly, the project is developing and optimizing algorithms for the retrieval of hourly aerosol optical depth (AOD) maps from the Spinning Enhanced Visible and InfraRed Imager (SEVIRI) onboard of Meteosat Second Generation. As a second activity, SAMIRA aims to derive particulate matter (PM2.5) estimates from AOD data by developing robust algorithms for AOD-to-PM conversion with the support from model- and Lidar data. In a third activity, we evaluate the added value of satellite products of atmospheric composition for operational European-scale air quality mapping using geostatistics and auxiliary datasets. The additional benefit of satellite-based monitoring over existing monitoring techniques (in situ, models) is tested by combining these datasets using geostatistical methods and demonstrated for nitrogen dioxide (NO2), sulphur dioxide (SO2), and aerosol optical depth/particulate matter. As a fourth activity, the project is developing novel algorithms for downscaling coarse

  15. Compilation of results 1987

    International Nuclear Information System (INIS)

    1987-01-01

    A compilation is carried out which in concentrated form presents reports on research and development within the nuclear energy field covering a two and a half years period. The foregoing report was edited in December 1984. The projects are presendted with title, project number, responsible unit, person to contact and short result reports. The result reports consist of short summaries over each project. (L.F.)

  16. Informal worker phenomenon in housing construction project

    Science.gov (United States)

    Wijayaningtyas, Maranatha; Sipan, Ibrahim; Lukiyanto, Kukuh

    2017-11-01

    The informal workers phenomenon on housing construction projects in Indonesia is different from workers in other sectors who would always request as permanent employees. Substantively, the informal workers are disinclined to be bound as permanent employees which different from the general labor paradigm. Hence, the objective of this study is to find out how the labour selection process, the factors that affected their performance, and the suitable wage system to achieve the target completion of housing construction project. The qualitative method is used to uncover and understand the meaning behind the phenomena (numina) of informal workers action and their influence on housing construction project which called phenomenological approach. Five informal workers and two project managers were selected as informants based on predetermined criteria with in-depth interviews. The results showed that the informal worker were more satisfied with the wage based on unit price while working in the housing construction project for the flexibility in working hours. In addition, the developer was also relieved because they only control the quality and the achievement of the project completion time which supported by informal worker leader. Therefore, these findings are beneficial for both of developer and government as policy maker to succeed the housing program in Indonesia.

  17. The HGF strategy project

    International Nuclear Information System (INIS)

    Knebel, J.U.; Fellmoser, F.; Lefhalm, C.; Mack, K.; Pettan, C.; Piecha, H.; Konys, J.; Adelhelm, C.; Glasbrenner, H.; Muscher, H.; Novotny, J.; Voss, Z.; Wedemeyer, O.; Mueller, G.; Heinzel, A.; Schumacher, G.; Huber, R.; Zimmermann, F.; Groetzbach, G.; Dorr, B.; Carteciano, L.N.

    2000-01-01

    Within the Hermann von Helmholtz-Gemeinschaft Deutscher Forschungszentren (HGF) an HGF-Strategy Fund Project entitled 'Innovative Technologies to Reduce Radiotoxicity' is funded since October 1999. The objectives of this HGF-Strategy Fund Project is the development of new methods and technologies to design and manufacture thin-walled and highly thermally-loaded surfaces which are cooled by a corrosive heavy liquid metal (lead-bismuth eutectic). The result of this project will be the basic scientific-technical tool which allows the conception and the design of a European Demonstrator of an ADS system (cf. 32.23.05). The work performed at Forschungszentrum Karlsruhe is embedded in a broad European research and development programme on ADS systems. The project is divided in three sub-projects: Sub-Project 1: Thermalhydraulic Investigations, Sub-Project 2: Material Specific Investigations, Sub-Project 3: Oxygen Control System. This progress report gives a general description of the project and its envisaged objectives. As a selection of the results achieved, first, FLUTAN calculations for the COULI beam window design and, second, the oxygen control system for the KArlsruhe Lead LAboratory KALLA are described in detail. Finally, the design and status of KALLA is given. (orig.)

  18. Effects of Risk Management Practices on IT Project Success

    Directory of Open Access Journals (Sweden)

    Pimchangthong Daranee

    2017-03-01

    Full Text Available Successful management of an information technology (IT project is the most desirable for all organisations and stakeholders. Many researchers elaborated that risk management is a key part of project management for any project size. Risk management is so critical because it provides project managers with a forward-looking view of both threats and opportunities to improve the project success. The objectives of this research are to explore organisational factors affecting IT project success and risk management practices influencing IT project success. Risk management practices include risk identification, risk analysis, risk response planning, and risk monitoring and control. The IT project success is measured by process performance and product performance. Data are collected from 200 project managers, IT managers, and IT analysts in IT firms through questionnaires and analysed using Independent Sample t-test, One-way ANOVA, and Multiple Linear Regression at the statistical significance level of 0.05. The results show that the differences in organisational types affect IT project success in all aspects, while the differences on organisational sizes affect IT project success in the aspect of product performance and total aspects. Risk identification and risk response planning influence the process performance and the total aspects of IT project success. Risk identification has the highest positive influence on product performance, followed closely by risk response, while risk analysis negatively influences product performance.

  19. Design and development of an intelligent nursing bed - a pilot project of "joint assignment".

    Science.gov (United States)

    Jiehui Jiang; Tingwei Liu; Yuting Zhang; Yu Song; Mi Zhou; Xiaosong Zheng; Zhuangzhi Yan

    2017-07-01

    The "joint assignment" is a creative bachelor education project for Biomedical Engineering (BME) in Shanghai University (SHU), China. The objective of this project is to improve students' capabilities in design thinking and teamwork through practices in the process of the design and development of complex medical product. As the first step, a pilot project "design and development of intelligent nursing bed" was set up in May 2015. This paper describes details of how project organization and management, various teaching methods and scientific evaluation approaches were achieved in this pilot project. For example, a method containing one main line and four branches is taken to manage the project and "prototyping model" was used as the main research approach. As a result a multi-win situation was achieved. The results showed, firstly, 62 bachelor students including 16 BME students were well trained. They improved themselves in use of practical tools, communication skills and scientific writing; Secondly, commercial companies received a nice product design on intelligent nursing bed, and have been working on industrializing it; Thirdly, the university and associated schools obtained an excellent practical education experience to supplement traditional class education; Fourthly and most importantly, requirements from end-users will be met. The results also showed that the "joint assignment" task could become a significant component in BME bachelor education.

  20. PROJECT MANAGEMENT CONSIDERED IN A 2014 PERSPECTIVE

    OpenAIRE

    GRAPA ADELINA-ROXANA; SOARE ALICE-MAGDALENA

    2014-01-01

    Project Management has come of age, yet multiple surveys and reports confirm the fact that the majority of projects are challenged. Given the more demanding and strict financial constraints associated with the current fiscal climate, project management is regarded as a tool that can deliver more with less. The literature on Project Management shows that, in spite of advancement in Project Management processes, tools and systems, project success has not significantly improved. T...

  1. Constructing a Cross-Domain Resource Inventory: Key Components and Results of the EarthCube CINERGI Project.

    Science.gov (United States)

    Zaslavsky, I.; Richard, S. M.; Malik, T.; Hsu, L.; Gupta, A.; Grethe, J. S.; Valentine, D. W., Jr.; Lehnert, K. A.; Bermudez, L. E.; Ozyurt, I. B.; Whitenack, T.; Schachne, A.; Giliarini, A.

    2015-12-01

    While many geoscience-related repositories and data discovery portals exist, finding information about available resources remains a pervasive problem, especially when searching across multiple domains and catalogs. Inconsistent and incomplete metadata descriptions, disparate access protocols and semantic differences across domains, and troves of unstructured or poorly structured information which is hard to discover and use are major hindrances toward discovery, while metadata compilation and curation remain manual and time-consuming. We report on methodology, main results and lessons learned from an ongoing effort to develop a geoscience-wide catalog of information resources, with consistent metadata descriptions, traceable provenance, and automated metadata enhancement. Developing such a catalog is the central goal of CINERGI (Community Inventory of EarthCube Resources for Geoscience Interoperability), an EarthCube building block project (earthcube.org/group/cinergi). The key novel technical contributions of the projects include: a) development of a metadata enhancement pipeline and a set of document enhancers to automatically improve various aspects of metadata descriptions, including keyword assignment and definition of spatial extents; b) Community Resource Viewers: online applications for crowdsourcing community resource registry development, curation and search, and channeling metadata to the unified CINERGI inventory, c) metadata provenance, validation and annotation services, d) user interfaces for advanced resource discovery; and e) geoscience-wide ontology and machine learning to support automated semantic tagging and faceted search across domains. We demonstrate these CINERGI components in three types of user scenarios: (1) improving existing metadata descriptions maintained by government and academic data facilities, (2) supporting work of several EarthCube Research Coordination Network projects in assembling information resources for their domains

  2. Servant leadership behaviors of aerospace and defense project managers and their relation to project success

    Science.gov (United States)

    Dominik, Michael T.

    The success of a project is dependent in part on the skills, knowledge, and behavior of its leader, the project manager. Despite advances in project manager certifications and professional development, the aerospace and defense industry has continued to see highly visible and expensive project failures partially attributable to failures in leadership. Servant leadership is an emerging leadership theory whose practitioners embrace empowerment, authenticity, humility, accountability, forgiveness, courage, standing back, and stewardship, but has not yet been fully examined in the context of the project manager as leader. The objective of this study was to examine the relationship between servant leadership behaviors demonstrated by aerospace and defense project managers and the resulting success of their projects. Study participants were drawn from aerospace and defense oriented affinity groups from the LinkedInRTM social media web system. The participants rated their project managers using a 30-item servant leadership scale, and rated the success of their project using a 12-item project success scale. One hundred and fifteen valid responses were analyzed from 231 collected samples from persons who had worked for a project manager on an aerospace and defense project within the past year. The results of the study demonstrated statistically significant levels of positive correlation to project success for all eight servant leadership factors independently evaluated. Using multiple linear regression methods, the servant leadership factors of empowerment and authenticity were determined to be substantial and statistically significant predictors of project success. The study results established the potential application of servant leadership as a valid approach for improving outcomes of projects.

  3. Climate Change in Environmental Impact Assessment of Renewable Energy Projects

    DEFF Research Database (Denmark)

    Larsen, Sanne Vammen

    2012-01-01

    Many renewable energy projects are subject to EIA. However a question that surfaces is what use an impact assessment is when the project is ‘good for the environment’? One of the current topics receiving much attention in impact assessment is climate change and how this factor is integrated...... in impact assessments. This warrants the question: How do we assess the climate change related impacts of a project that inherently has a positive effect on climate? This paper is based on a document study of EIA reports from Denmark. The results show that climate change is included in most of the EIA...... reports reviewed, and that only climate change mitigation is in focus while adaptation is absent. Also the results point to focus on positive impacts, while the indirect negative impacts are less apparent. This leads to a discussion of the results in the light of the purpose of EIA....

  4. Competency model for the project managers of technical projects

    Science.gov (United States)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  5. Stakeholder Salience in ERP Projects

    OpenAIRE

    Salhotra, Eashan

    2014-01-01

    The aim of this study is to examine stakeholder involvement in an Enterprise Resource Planning (ERP) System project that involves implementation and improvement of the implemented system. The study targets stakeholders, their classification, and their degree of importance during different phases of an ERP project life cycle, i.e. planning, implementation, stabilisation and improvement. The study shows that stakeholder involvement and their salience vary along the ERP project life cycle a...

  6. From concept to construction: a 15 MW small hydro project

    Energy Technology Data Exchange (ETDEWEB)

    Stephens, S.; Neegan, K.

    1995-12-31

    An audio recording of an address by Chief Stanley Stephens and Deputy-Chief Ken Neegan of the Constance Lake First Nation, at the Renewable Energy Commercial Trade Show and Markets Conference was presented. The speech concerned development of a 15 MW hydro project on the reservation. Stephens recalled how initial opposition was overcome by addressing simple misconceptions about the project. The project was initiated by the Ontario Energy Corporation with a series of community discussions which addressed environmental impacts, and benefits that would result from the project. Neegan explained that after deliberation and negotiations, the Constance Lake First Nation was pleased with the project. This project was evidence that sound partnership could be formed between First Nations and hydro developers, while preserving respect for `Mother Earth` in the process. Trust between the community, the developers and government was considered to be the critical component of the project. Sound legal, technical, environmental and financial information was also indispensable in allowing the Constance Lake First Nation to make its decision to proceed with the project.

  7. From concept to construction: a 15 MW small hydro project

    International Nuclear Information System (INIS)

    Stephens, S.; Neegan, K.

    1995-01-01

    An audio recording of an address by Chief Stanley Stephens and Deputy-Chief Ken Neegan of the Constance Lake First Nation, at the Renewable Energy Commercial Trade Show and Markets Conference was presented. The speech concerned development of a 15 MW hydro project on the reservation. Stephens recalled how initial opposition was overcome by addressing simple misconceptions about the project. The project was initiated by the Ontario Energy Corporation with a series of community discussions which addressed environmental impacts, and benefits that would result from the project. Neegan explained that after deliberation and negotiations, the Constance Lake First Nation was pleased with the project. This project was evidence that sound partnership could be formed between First Nations and hydro developers, while preserving respect for 'Mother Earth' in the process. Trust between the community, the developers and government was considered to be the critical component of the project. Sound legal, technical, environmental and financial information was also indispensable in allowing the Constance Lake First Nation to make its decision to proceed with the project

  8. Requirement Volatility, Standardization and Knowledge Integration in Software Projects: An Empirical Analysis on Outsourced IS Development Projects

    Directory of Open Access Journals (Sweden)

    Rajesri Govindaraju

    2015-08-01

    Full Text Available Information systems development (ISD projects are highly complex, with different groups of people having  to collaborate and exchange their knowledge. Considering the intensity of knowledge exchange that takes place in outsourced ISD projects, in this study a conceptual model was developed, aiming to examine the influence of four antecedents, i.e. standardization, requirement volatility, internal integration, and external integration, on two dependent variables, i.e. process performance and product performance. Data  were collected from 46 software companies in four big cities in Indonesia. The collected data were examined to verify the proposed theoretical model using the partial least square structural equation modeling (PLS-SEM technique. The results show that process performance is significantly influenced by internal integration and standardization, while product performance is  significantly influenced by external integration and  requirement volatility. This study contributes  to a better understanding of how knowledge integration can be managed in outsourced ISD projects in view of increasing their success.

  9. 17th Symposium of NEDO projects. Introducing/spreading project subcommittee; Donyu fukyu jigyo bunkakai. Dai 17kai jigyo hokokukai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    The results of the following themes are presented in this subcommittee; (1) outline of the new energy introduction promotion department, (2) the project results, and (3) introduction of the examples. For the theme (1), NEDO is supporting the projects for introducing and promoting new energy systems, feasibility studies for introduction of these systems, and field test (FT) projects to accumulate the experiences, e.g., collecting the data by operating these systems under actual loads, development and technology demonstration projects for introduction of new energy systems, and advisory projects for supporting introduction of new energy systems. For the theme (2), those results reported include the results and examples of the FT projects for power generation by photovoltaic cells and wind power generation, results of the FT project for power generation by fuel cells and creation of the FT projects for pioneer high-efficiency energy systems, current status of the environment-friendly energy community projects (heat supply systems), results and examples of the environment- friendly energy community projects (power generation projects), demonstration tests for establishing the distributed power supply systems of the next generation, tests for establishing techniques for, e.g., load-leveling in power generation by photovoltaic cells for residential purposes, results of the project for technology of utilizing unutilized energy, survey on the techniques for power generation by wastes, and advisory projects for supporting introduction of new energy. (NEDO)

  10. The Human Genome Diversity Project

    Energy Technology Data Exchange (ETDEWEB)

    Cavalli-Sforza, L. [Stanford Univ., CA (United States)

    1994-12-31

    The Human Genome Diversity Project (HGD Project) is an international anthropology project that seeks to study the genetic richness of the entire human species. This kind of genetic information can add a unique thread to the tapestry knowledge of humanity. Culture, environment, history, and other factors are often more important, but humanity`s genetic heritage, when analyzed with recent technology, brings another type of evidence for understanding species` past and present. The Project will deepen the understanding of this genetic richness and show both humanity`s diversity and its deep and underlying unity. The HGD Project is still largely in its planning stages, seeking the best ways to reach its goals. The continuing discussions of the Project, throughout the world, should improve the plans for the Project and their implementation. The Project is as global as humanity itself; its implementation will require the kinds of partnerships among different nations and cultures that make the involvement of UNESCO and other international organizations particularly appropriate. The author will briefly discuss the Project`s history, describe the Project, set out the core principles of the Project, and demonstrate how the Project will help combat the scourge of racism.

  11. A Decision Support System Based on Soil Ecological Criteria: Results from the European ECOGEN Project

    DEFF Research Database (Denmark)

    Cortet, J.; Bohanec, M.; ?nidar?ic, M.

    and the public who are concerned about the possible ecological implications. The ECOGEN (www.ecogen.dk) project Soil ecological and economic evaluation of genetically modified crops is an EU-funded project aimed at combining simple lab tests, multi-species model ecosystems and field studies to acquire...... mechanistic and realistic knowledge about economic and ecological impacts of GM crops on the soil (Cortet et al, 2005, Griffiths et al, 2005, Vercesi et al, 2005). Economic trade-offs are assessed and related to ecological effects (Scatasta at al, 2005). One of the goals of the project is to develop...... a computer-based decision support system for the assessment of economic and ecological impacts of using GM crops, with special emphasis on soil biology and ecology. For model development, we have taken the approach of qualitative multi-attribute modeling (Bohanec 2003). The idea is to develop a hierarchical...

  12. Interest in an online smoking cessation program and effective recruitment strategies: results from Project Quit.

    Science.gov (United States)

    McClure, Jennifer B; Greene, Sarah M; Wiese, Cheryl; Johnson, Karin E; Alexander, Gwen; Strecher, Victor

    2006-08-22

    The Internet is a promising venue for delivering smoking cessation treatment, either as a stand-alone program or as an adjunct to pharmacotherapy. However, there is little data to indicate what percent of smokers are interested in receiving online smoking cessation services or how best to recruit smokers to Internet-based programs. Using a defined recruitment sample, this study aimed to identify the percentage of smokers who expressed interest in or enrolled in Project Quit, a tailored, online, cognitive-behavioral support program offered with adjunctive nicotine replacement therapy patches. In addition, we examined the effectiveness of several individual-level versus population-level recruitment strategies. Members from two large health care organizations in the United States were invited to participate in Project Quit. Recruitment efforts included proactive invitation letters mailed to 34533 likely smokers and reactive population-level study advertisements targeted to all health plan members (> 560000 adults, including an estimated 98000 smokers across both health care organizations). An estimated 1.6% and 2.5% of adult smokers from each health care organization enrolled in Project Quit. Among likely smokers who received proactive study invitations, 7% visited the Project Quit website (n = 2260) and 4% (n = 1273) were eligible and enrolled. Response rates were similar across sites, despite using different sources to assemble the invitation mailing list. Proactive individual-level recruitment was more effective than other forms of recruitment, accounting for 69% of website visitors and 68% of enrollees. Smokers were interested in receiving online smoking cessation support, even though they had access to other forms of treatment through their health insurance. Uptake rates for this program were comparable to those seen when smokers are advised to quit and are referred to other forms of smoking cessation treatment. In this sample, proactive mailings were the best

  13. Managing projects a team-based approach

    CERN Document Server

    Brown, Karen A

    2010-01-01

    Students today are likely to be assigned to project teams or to be project managers almost immediately in their first job. Managing Projects: A Team-Based Approach was written for a wide range of stakeholders, including project managers, project team members, support personnel, functional mangers who provide resources for projects, project customers (and customer representatives), project sponsors, project subcontractors, and anyone who plays a role in the project delivery process. The need for project management is on the rise as product life cycles compress, demand for IT systems increases, and business takes on an increasingly global character. This book adds to the project management knowledge base in a way that fills an unmet need—it shows how teams can apply many of the standard project management tools, as well as several tools that are relatively new to the field. Managing Projects: A Team-Based Approach offers the academic rigor found in most textbooks along with the practical attributes often foun...

  14. Applying a Hybrid MCDM Model for Six Sigma Project Selection

    Directory of Open Access Journals (Sweden)

    Fu-Kwun Wang

    2014-01-01

    Full Text Available Six Sigma is a project-driven methodology; the projects that provide the maximum financial benefits and other impacts to the organization must be prioritized. Project selection (PS is a type of multiple criteria decision making (MCDM problem. In this study, we present a hybrid MCDM model combining the decision-making trial and evaluation laboratory (DEMATEL technique, analytic network process (ANP, and the VIKOR method to evaluate and improve Six Sigma projects for reducing performance gaps in each criterion and dimension. We consider the film printing industry of Taiwan as an empirical case. The results show that our study not only can use the best project selection, but can also be used to analyze the gaps between existing performance values and aspiration levels for improving the gaps in each dimension and criterion based on the influential network relation map.

  15. Sustainable Bridges – A European Integrated Research Project – Background Overview and Results

    DEFF Research Database (Denmark)

    Täljsten, Björn; Elfgren, Lennart

    2008-01-01

    of energy and release of greenhouse gases. To help our society to be more sustainable, it is important to retain and use what we already have where possible, rather than investing in new structures. Instead of tearing down old, often beautiful, railway bridges and replacing them with new ones, we need...... to preserve and upgrade them by using better assessment, monitoring and strengthening methods. This was also the aim of the European Integrated Research Project “Sustainable Bridges – Assessment for Future Traffic Demands and Longer Lives” when it was accepted for funding by the European Commission in 2003....... The project established the following three specific goals: 1. increase the transport capacity of existing railway bridges by allowing higher axle loads (up to 33 tons) for freight traffic at moderate speeds or by allowing higher speeds (up to 350 km/hour) for passenger traffic with low axle loads 2. extend...

  16. Risk and direct protective factors for youth violence: results from the Centers for Disease Control and Prevention's Multisite Violence Prevention Project.

    Science.gov (United States)

    Henry, David B; Tolan, Patrick H; Gorman-Smith, Deborah; Schoeny, Michael E

    2012-08-01

    This study was conducted as part of a multisite effort to examine risk and direct protective factors for youth violence. The goal was to identify those factors in the lives of young people that increase or decrease the risk of violence. These analyses fill an important gap in the literature, as few studies have examined risk and direct protective factors for youth violence across multiple studies. Data on 4432 middle-school youth, from the CDC Multisite Violence Prevention Project were used. Evaluations were made of effects of variables coded as risk and direct protective factors in the fall of 6th grade on violence measured in spring of 7th and 8th grades. Factors tested included depression, delinquency, alcohol and drug involvement, involvement in family activities, academic achievement, attitudes toward school, truancy, and peer deviance. Most variables were coded with two sets of dummy variables indicating risk and protective directions of effects. Results showed that higher teacher-rated study skills were associated with lower subsequent violence across genders and ethnic groups. Affiliation with deviant peers was significantly associated with increased subsequent violence among youth reporting their race/ethnicity as white or other, marginally associated with increased violence among African-American youth, and unrelated among Latino youth. This study identified some factors than should be areas of interest for effective prevention programs. Some ethnic differences also should be considered in planning of prevention. The CDC Multisite Violence Prevention Project completed enrollment prior to July 2005. Copyright © 2012. Published by Elsevier Inc.

  17. Achievements and bottlenecks in humanitarian demining EU-funded research: final results from the EC DELVE project

    Science.gov (United States)

    Sahli, Hichem; Bruschini, Claudio; Van Kempen, Luc; Schleijpen, Ric; den Breejen, Eric

    2008-04-01

    The EC DELVE Support Action project has analyzed the bottlenecks in the transfer of Humanitarian Demining (HD) technology from technology development to the use in the field, and drawn some lessons learned, basing itself on the assessment of the European Humanitarian Demining Research and Technology Development (RTD) situation from early 1990 until 2006. The situation at the European level was analyzed with emphasis on activities sponsored by the European Commission (EC). This was also done for four European countries and Japan, with emphasis on national activities. The developments in HD during the last 10 years underline the fact that in a number of cases demining related developments have been terminated or at least put on hold. The study also showed that the funding provided by the EC under the Framework Program for RTD has led directly to the creation of an extensive portfolio of Humanitarian Demining technology development projects. The latter provided a range of research and supporting measures addressing the critical issues identified as a result of the regulatory policies developed in the field of Humanitarian Demining over the last ten years. However, the range of instruments available to the EC to finance the necessary research and development were limited, to pre-competitive research. The EC had no tools or programs to directly fund actual product development. As a first consequence, the EC funding program for development of technology for Humanitarian Demining unfortunately proved to be largely unsuitable for the small-scale development needed in a field where there is only a very limited market. As a second consequence, most of the research has been demonstrator-oriented. Moreover, the timeframe for RTD in Humanitarian Demining has not been sufficiently synchronized with the timeframe of the EC policies and regulations. The separation of the Mine Action and RTD funding streams in the EC did also negatively affect the take-up of new technologies. As a

  18. Space Projects: Improvements Needed in Selecting Future Projects for Private Financing

    Science.gov (United States)

    1990-01-01

    The Office of Management and Budget (OMB) and NASA jointly selected seven projects for commercialization to reduce NASA's fiscal year 1990 budget request and to help achieve the goal of increasing private sector involvement in space. However, the efforts to privately finance these seven projects did not increase the commercial sector's involvement in space to the extent desired. The General Accounting Office (GAO) determined that the projects selected were not a fair test of the potential of increasing commercial investment in space at an acceptable cost to the government, primarily because the projects were not properly screened. That is, neither their suitability for commercialization nor the economic consequences of seeking private financing for them were adequately evaluated before selection. Evaluations and market tests done after selection showed that most of the projects were not viable candidates for private financing. GAO concluded that projects should not be removed from NASA's budget for commercial development until after careful screening has been done to determine whether adequate commercial demand exists, development risks are commercially acceptable and private financing is found or judged to be highly likely, and the cost effectiveness of such a decision is acceptable. Premature removal of projects from NASA's budget ultimately can cause project delays and increased costs when unsuccessful commercialization candidates must be returned to the budget. NASA also needs to ensure appropriate comparisons of government and private financing options for future commercialization projects.

  19. Urban exports to the nonurban troposphere: Results from project MISTT

    International Nuclear Information System (INIS)

    White, W.H.; Patterson, D.E.; Wilson, W.E. Jr.

    1983-01-01

    An identifiable plume of contaminated air forms downwind of metropolitan St. Louis under certain conditions. The contribution of this urban plume to tropospheric ozone and aerosol loadings is calculated from concentration and wind fields measured during Project MISTT. On all three summer days selected for study, net ozone exports reached 2-3 x 10 6 g mol/h, or about 3/2 mole per mole of emitted nitrogen, within hours of emission. Conversion of sulfur dioxide to sulfate aerosol was incomplete at the distances sampled: it is estimated that haze exports ultimately reached 500--600 km 2 /h, or 8--9 m 2 per gram of emitted sulfur. Simple extrapolation of the yields observed at St. Louis indicates that anthropogenic inputs overwhelm natural contributions to ozone and aerosols over eastern North America

  20. Interest in smart metering project surprises utility, IBM

    International Nuclear Information System (INIS)

    Horne, D.

    2006-01-01

    This article provided an outline of Hydro Ottawa and IBM's smart metering pilot project, which has resulted in high approval ratings from the public. The project features 375 participants broken down into 3 separate groups to look for potential consumption differences between customers charged according to standard time-of-use pricing; time-of-use with critical peak pricing; and time-of-use with critical peak rebates. The Ontario Smart Price Pilot project will be run for 5 months, and is expected to provide detailed energy information about usage. Past projects have indicated that customers respond quickly to smart metering, as they are able to monitor their energy usage and more effectively manage their energy consumption. Ontario plans to have all homes and small businesses using smart meters by 2010, as high seasonal demand has indicated that conservation and balanced resource use are now top priorities for many utility companies. At least 10 states in the United States have conducted smart metering pilot projects. The California Public Utilities Commissions has recently approved a $1.7 billion statewide plan to replace old meters with smart meters. In Ontario, customers have ordered 10,000 electricity monitors that Hydro One is giving away. It was concluded that research results from an earlier Hydro One demonstration project with 500 Ontario homeowners showed that real time electricity monitors can help homeowners reduce their consumption of electricity by up to 15 per cent. 4 figs

  1. Oskarshamn 1-project FENIX

    International Nuclear Information System (INIS)

    Sjoeqvist, N.G.

    1994-01-01

    This paper summarizes the actions to be taken in a large re-start and backfitting project such as the Fenix project. It describes the organization, planning and financial management, safety criteria and licensing procedures, safety concept report, health and safety. The results from the unique full system decontamination of the reactor pressure vessel is described. The project is still ongoing and therefore other results and lessons learnt are not reported. (author) 9 figs

  2. Report on results in research and development 1989

    International Nuclear Information System (INIS)

    1990-01-01

    This presentation of results of R and D work represents for the Karlsruhe Nuclear Research Centre its scientific annual report for the year 1989, as required by its constitution. The report is divided according to the main areas of work of the KfK in a similar manner to the R and D planning. The individual reports were prepared by the participating institutes and main departments and were then grouped thematically with a note of their origins. The main areas of work are the Fast Breeder Project, the separation nozzle method, the Nuclear Fusion Project, the Reprocessing and Waste Treatment Project, terminal storage, environment and safety solids and matter research, nuclear and particle physics, microtechnology, handling and other research plans (for example, the Advanced Pressurized Water Reactor). This report shows the progress of studies on each project named in the KfK R and D programme. The correlation to the R and D programme is meant to facilitate the comparison of aims with achievements and explain the complete context of what are often individual tasks carried out by several institutes. Detailed results can be found in the quoted scientific-technical publications on internal preliminary reports. (orig./HK) [de

  3. On Helical Projection and Its Application in Screw Modeling

    Directory of Open Access Journals (Sweden)

    Riliang Liu

    2014-04-01

    Full Text Available As helical surfaces, in their many and varied forms, are finding more and more applications in engineering, new approaches to their efficient design and manufacture are desired. To that end, the helical projection method that uses curvilinear projection lines to map a space object to a plane is examined in this paper, focusing on its mathematical model and characteristics in terms of graphical representation of helical objects. A number of interesting projective properties are identified in regard to straight lines, curves, and planes, and then the method is further investigated with respect to screws. The result shows that the helical projection of a cylindrical screw turns out to be a Jordan curve, which is determined by the screw's axial profile and number of flights. Based on the projection theory, a practical approach to the modeling of screws and helical surfaces is proposed and illustrated with examples, and its possible application in screw manufacturing is discussed.

  4. The One-Page Project Manager Comunicate and Manage Any Project With a Single Sheet of Paper

    CERN Document Server

    Campbell, Clark A

    2007-01-01

    The One-Page Project Manager shows you how to boil down any project into a simple, one-page document that can be used to communicate all essential details to upper management, other departments, suppliers, and audiences. This practical guide will save time and effort, helping you identify the vital parts of a project and communicate those parts and duties to other team members.

  5. Introduction to the Project

    DEFF Research Database (Denmark)

    Kuhn, Johan M.; Malchow-Møller, Nikolaj; Sørensen, Anders

    In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two...... important qualifications for the understanding of the contributions and results established in the project....

  6. Managing complex industrial change through projects

    OpenAIRE

    Perotti , Clément; Minel , Stéphanie; Benoit , Roussel; Jean , Renaud

    2010-01-01

    International audience; This paper proposes some elements showing that project is an appropriate way to manage organizational change, and that an individual change occurs during these phases. We suggest that project team should manage individual change in the framework of project for three main reasons. First, being at the crossroad of strategic and operational levels, project team is in the right position in organisation to "translate" organizational change to individuals, and vice-versa. Se...

  7. Cumulative biological impacts framework for solar energy projects in the California Desert

    Science.gov (United States)

    Davis, Frank W.; Kreitler, Jason R.; Soong, Oliver; Stoms, David M.; Dashiell, Stephanie; Hannah, Lee; Wilkinson, Whitney; Dingman, John

    2013-01-01

    This project developed analytical approaches, tools and geospatial data to support conservation planning for renewable energy development in the California deserts. Research focused on geographical analysis to avoid, minimize and mitigate the cumulative biological effects of utility-scale solar energy development. A hierarchical logic model was created to map the compatibility of new solar energy projects with current biological conservation values. The research indicated that the extent of compatible areas is much greater than the estimated land area required to achieve 2040 greenhouse gas reduction goals. Species distribution models were produced for 65 animal and plant species that were of potential conservation significance to the Desert Renewable Energy Conservation Plan process. These models mapped historical and projected future habitat suitability using 270 meter resolution climate grids. The results were integrated into analytical frameworks to locate potential sites for offsetting project impacts and evaluating the cumulative effects of multiple solar energy projects. Examples applying these frameworks in the Western Mojave Desert ecoregion show the potential of these publicly-available tools to assist regional planning efforts. Results also highlight the necessity to explicitly consider projected land use change and climate change when prioritizing areas for conservation and mitigation offsets. Project data, software and model results are all available online.

  8. Towards a new generation of flow and transport models for the Aespoe Hard Rock Laboratory. Main results from the project Aespoe models 2005

    Energy Technology Data Exchange (ETDEWEB)

    Svensson, Urban (ed.) (Computer-aided Fluid Engineering AB (CFE AB), SE-602 10 Norrkoeping (Sweden)); Vidstrand, Patrik (Bergab AB, Goeteborg (Sweden)); Neretnieks, Ivars (Dept. of Chemical Engineering and Technology, Royal Inst. of Technology, Stockholm (Sweden)); Wallin, Bill (Geokema, Lidingoe (Sweden))

    2008-05-15

    This report constitutes the outcome of a project called 'Aespoe models 2005'. The main objective of the project has been to provide a first step towards a new generation of numerical models of flow and transport, for the Aespoe HRL. In order to achieve this goal, work has been carried out along three parallel lines; discussion of basic concepts, compilation and analysis of data and model applications. A number of sub tasks are reported as appendices in the report. In fact, these appendices represent the main achievements of the project: an analysis of fracture properties, compilation of isotope and chemical data, dispersion and mixing in fractured rocks and model results. The conclusion of the project is that significant contributions to a new generation of Aespoe models have been obtained. It has further been demonstrated that working numerical simulations are up and running. Recommendations are provided for the continued work

  9. Towards a new generation of flow and transport models for the Aespoe Hard Rock Laboratory. Main results from the project Aespoe models 2005

    International Nuclear Information System (INIS)

    Svensson, Urban; Vidstrand, Patrik; Neretnieks, Ivars; Wallin, Bill

    2008-05-01

    This report constitutes the outcome of a project called 'Aespoe models 2005'. The main objective of the project has been to provide a first step towards a new generation of numerical models of flow and transport, for the Aespoe HRL. In order to achieve this goal, work has been carried out along three parallel lines; discussion of basic concepts, compilation and analysis of data and model applications. A number of sub tasks are reported as appendices in the report. In fact, these appendices represent the main achievements of the project: an analysis of fracture properties, compilation of isotope and chemical data, dispersion and mixing in fractured rocks and model results. The conclusion of the project is that significant contributions to a new generation of Aespoe models have been obtained. It has further been demonstrated that working numerical simulations are up and running. Recommendations are provided for the continued work

  10. Demonstration project Klaipeda, Lithuania. Final evaluation of 1. year results after rehabilitation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-07-01

    In order to investigate various options for reduction of the district heating return temperature and for introduction of energy saving measures in the buildings, a demonstration area comprising eight buildings was selected. The eight buildings selected were typical 5-floor buildings built in 1982-89. This enabled the experience to be transferred to a maximum number of buildings in Klaipeda and in Lithuania, in general. All buildings had a one-string radiator system installed. Since 1991, the supply temperature in Klaipeda district heating system has been reduced. This has led to a lower indoor temperature, which has decreased from the design value 18 deg. C to 15 dec. C due to shortage of fuel. With such a low room temperature, the improved sytems may result in better comfort rather than in energy savings. The project has been implemented during a two-year period from heating season 97/98 to 98/99. The first year before the heating season 97/98, energy and flow meters were installed for measuring the existing heating and hot water consumption. For the next heating season 1998/1999, various energy saving measures were installed, and measurements were caried out again. After that, the energy consumption and temperature levels were analysed and compared for the two seasons. (au)

  11. Neural network algorithm for image reconstruction using the grid friendly projections

    International Nuclear Information System (INIS)

    Cierniak, R.

    2011-01-01

    Full text: The presented paper describes a development of original approach to the reconstruction problem using a recurrent neural network. Particularly, the 'grid-friendly' angles of performed projections are selected according to the discrete Radon transform (DRT) concept to decrease the number of projections required. The methodology of our approach is consistent with analytical reconstruction algorithms. Reconstruction problem is reformulated in our approach to optimization problem. This problem is solved in present concept using method based on the maximum likelihood methodology. The reconstruction algorithm proposed in this work is consequently adapted for more practical discrete fan beam projections. Computer simulation results show that the neural network reconstruction algorithm designed to work in this way improves obtained results and outperforms conventional methods in reconstructed image quality. (author)

  12. A sustainability analysis of an incineration project in Serbia.

    Science.gov (United States)

    Mikic, Miljan; Naunovic, Zorana

    2013-11-01

    The only option for municipal solid waste (MSW) treatment adopted so far in Serbia is landfilling. Similarly to other south-eastern European countries, Serbia is not recovering any energy from MSW. Fifty percent of electricity in Serbia is produced in coal-fired power plants with emission control systems dating from the 1980s. In this article, the option of MSW incineration with energy recovery is proposed and examined for the city of Novi Sad. A sustainability analysis consisting of financial, economic and sensitivity analyses was done in the form of a cost-benefit analysis following recommendations from the European Commission. Positive and negative social and environmental effects of electricity generation through incineration were valuated partly using conversion factors and shadow prices, and partly using the results of previous studies. Public aversion to MSW incineration was considered. The results showed that the incineration project would require external financial assistance, and that an increase of the electricity and/or a waste treatment fee is needed to make the project financially positive. It is also more expensive than the landfilling option. However, the economic analysis showed that society would have net benefits from an incineration project. The feed-in tariff addition of only €0.03 (KWh)(-1) to the existing electricity price, which would enable the project to make a positive contribution to economic welfare, is lower than the actual external costs of electricity generation from coal in Serbia.

  13. Budgetary Approach to Project Management by Percentage of Completion Method

    Directory of Open Access Journals (Sweden)

    Leszek Borowiec

    2011-07-01

    Full Text Available Efficient and effective project management process is made possible by the use of methods and techniques of project management. The aim of this paper is to present the problems of project management by using Percentage of Completion method. The research material was gathered based on the experience in implementing this method by the Johnson Controls International Company. The article attempts to demonstrate the validity of the thesis that the POC project management method, allows for effective implementation and monitoring of the project and thus is an effective tool in the managing of companies which exploit the budgetary approach. The study presents planning process of basic parameters affecting the effectiveness of the project (such as costs, revenue, margin and characterized how the primary measurements used to evaluate it. The present theme is illustrating by numerous examples for showing the essence of the raised problems and the results are presenting by using descriptive methods, graphical and tabular.

  14. Exploring the uncertainties of early detection results: model-based interpretation of mayo lung project

    Directory of Open Access Journals (Sweden)

    Berman Barbara

    2011-03-01

    Full Text Available Abstract Background The Mayo Lung Project (MLP, a randomized controlled clinical trial of lung cancer screening conducted between 1971 and 1986 among male smokers aged 45 or above, demonstrated an increase in lung cancer survival since the time of diagnosis, but no reduction in lung cancer mortality. Whether this result necessarily indicates a lack of mortality benefit for screening remains controversial. A number of hypotheses have been proposed to explain the observed outcome, including over-diagnosis, screening sensitivity, and population heterogeneity (initial difference in lung cancer risks between the two trial arms. This study is intended to provide model-based testing for some of these important arguments. Method Using a micro-simulation model, the MISCAN-lung model, we explore the possible influence of screening sensitivity, systematic error, over-diagnosis and population heterogeneity. Results Calibrating screening sensitivity, systematic error, or over-diagnosis does not noticeably improve the fit of the model, whereas calibrating population heterogeneity helps the model predict lung cancer incidence better. Conclusions Our conclusion is that the hypothesized imperfection in screening sensitivity, systematic error, and over-diagnosis do not in themselves explain the observed trial results. Model fit improvement achieved by accounting for population heterogeneity suggests a higher risk of cancer incidence in the intervention group as compared with the control group.

  15. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  16. Biomonitoring of chemicals in biota of two wetland protected areas exposed to different levels of environmental impact: results of the "PREVIENI" project.

    Science.gov (United States)

    Guerranti, Cristiana; Perra, Guido; Alessi, Eva; Baroni, Davide; Caserta, Dante; Caserta, Donatella; De Sanctis, Augusto; Fanello, Emiliano Leonida; La Rocca, Cinzia; Mariottini, Michela; Renzi, Monia; Tait, Sabrina; Zaghi, Carlo; Mantovani, Alberto; Focardi, Silvano Ettore

    2017-08-18

    The PREVIENI project (funded by the Ministry of Environment) investigated the exposure to endocrine disrupters in samples of human population and environmental biota in Italy. The environmental biomonitoring considered two Italian WWF Oasis, with the aim to compare the presence and effects of endocrine disruptors in organisms from two protected natural areas, respectively, upstream and downstream a chemical emission site. Chemical analysis of pollutants' tissue levels was made on tissues from earthworm, barbell, trout, and coot, selected as bioindicator organisms. The contaminants considered were as follows: the perfluorinated compounds perfuoroctane sulfonate (PFOS) and perfluorooctanoic acid (PFOA), polychlorinated biphenyls (PCBs 58 congeners), polybrominated diphenyl ethers (PBDEs, 13 congeners), polycyclic aromatic hydrocarbons (PAHs, 16 compounds), toxic trace elements, the phthalate di-2-ethylexyl phthalate (DEHP) and its primary metabolite, bisphenol A, synthetic musk compounds (musk xylene, musk ketone, tonalide, and galaxolide), and p-nonylphenol. The analyses showed low concentrations of most pollutants in all species from both areas, compared to available literature; noticeable exceptions were the increases of DEHP's primary metabolite, PBDE, PAHs, Hg, and Pb in barbells, and of PCB and Cd in earthworms from the downstream area. The results showed the presence of endocrine disruptors, including those considered as "non-persistent," in bioindicators from protected areas, albeit at low levels. The results provide a contribution to the evaluation of reference values in biota from Mediterranean Europe and support the relevance of monitoring exposure to pollutants, in particular for freshwater environment, also in protected areas.

  17. A first city-wide early defibrillation project in a German city: 5-year results of the Bochum against sudden cardiac arrest study

    Directory of Open Access Journals (Sweden)

    Hanefeld Christoph

    2010-06-01

    Full Text Available Abstract Background Immediate defibrillation is the decisive determinant of prognosis in patients suffering from cardiac/circulatory arrest caused by ventricular fibrillation (VF. Therefore, various national and international associations recommend that first responders use defibrillators as soon as possible and also recommend public access to early defibrillation programmes. Here we report the results of the first city-wide early defibrillation project in a large German urban area. Methods There were 155 automated external defibrillators (AEDs put into operation in the Bochum municipal area, and 6,294 people took part in cardiopulmonary resuscitation (CPR and AED training. Free, accessible AEDs were installed in places with large volumes of people. Additionally, emergency forces were progressively equipped with AEDs. Results Twelve AED administrations prior to the arrival of an emergency physician were recorded and analysed over a period of 5 years (08/2004-08/2009. Rhythm analysis via AED demonstrated VF in seven cases, non-malignant dysrhythmias in four cases and asystole in one case. Two of the seven patients with VF were successfully defibrillated and survived cardiac/circulatory arrest without any neurological sequelae. Eight of the 12 AED applications were performed by laymen. The mean time between switching the unit on and applying the electrodes to the patient was 39 seconds (SD +/-20 sec. On average, another 20 seconds elapsed before the AED recommendation of "shock delivery" was displayed, and a total of 96 seconds elapsed before shock administration (± 56 sec. Conclusion Consistent with other reports, our findings show that the organisation of a city-wide initiative by a project office combining public access and first-responder defibrillation programmes can be safe, feasible and successful. Our experiences confirm that strategic planning of AED placement is a prerequisite for successful, cost-effective resuscitation.

  18. Integrated Monitoring and Surveillance System demonstration project. Phase 2 accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Singleterry, R.C.

    1997-01-01

    The paper presents the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase 2 efforts. the rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include further development of the data acquisition system and procurement of necessary hardware/software, options and associated costs for plutonium canning systems and gloveboxes, initiation of facility modifications, determination of possibly affected facility documentation, results from sensor system trade study, and preliminary storage configuration designs. Resources invested during Phase 1 and Phase 2 are summarized and budgetary requirements for completion of Phase 3 presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase 2 deliverables

  19. Full-sky survey searching for ultra-narrow-band artificial CW signals: analysis of the results of Project META

    Science.gov (United States)

    Lemarchand, Guillermo A.

    1996-06-01

    Project META (Megachannel ExtraTerrestrial Assay), a full-sky survey for artificial narrow-band signals, has been conducted from the Harvard/Smithsonian 26 m radiotelescope at Agassiz Station and from one of the two 30 m radiotelescopes of the Instituto Argentino de Radioastronomia (IAR). The search was performed near the 1420 MHz line of neutral hydrogen, and its second harmonic, using two 8.4 X 10(superscript 6) channel Fourier spectrometers of 0.05 Hz resolution and 400 kHz of instantaneous bandwidth. The observing frequency was corrected both for motions with respect to three astronomical inertial frames, and for the effect of Earth's rotation, which provides a characteristic changing signature for narrow-band signals of extraterrestrial origin. Among the 6 X 10(superscript 13) spectral channels searched in the northern hemisphere, Horowitz and Sagan reported 37 candidates events exceeding the average threshold of 1.7 X 10(superscript -23) W m(superscript -2), while in the southern hemisphere among 2 X 10(superscript 13) spectral channels analyzed we found 19 events exceeding the same threshold. The strongest signals that survive culling for terrestrial interference lie in or near the Galactic Plane. The first high resolution southern target search around 71 stars (-90 degrees intelligence. It is showed that these narrow-band non-repeating 'events' found by Project META can be generated by (a) radiometer noise fluctuations, (b) a population of constant galactic sources which undergo deep fading and amplification due to interstellar scintillation, consistent with ETI transmissions and (c) real, transient signals of either terrestrial or extraterrestrial origin. The Bayesian test shows that hypothesis (b) and (c) are both highly preferred to (a), but the first two are about equally likely. Using this analysis we discuss the best observing strategies to determine the real origin of these 'events'.

  20. Reference projections for greenhouse gases in the Netherlands: emission projections for 2001 - 2010

    NARCIS (Netherlands)

    Wijngaarden R van den; Ybema JR; Gijsen A; Oude Lohuis JA; Thomas R; Daniels B; Dril AWN van; Volkers CH; Energieonderzoek Centrum; LAE

    2002-01-01

    The results are presented of the project 'reference projection for energy and greenhouse gases' carried out by RIVM and ECN for the Ministries of Housing, Spatial Planning and the Environment, and of Economic Affairs. The reference projection considers emission of greenhouse gases in

  1. Projection of future climate changes

    International Nuclear Information System (INIS)

    Boucher, Olivier; Dufresne, Jean-Louis; Vial, Jessica; Brun, Eric; Cattiaux, Julien; Chauvin, Fabrice; Salas y Melia, David; Voldoire, Aurore; Bopp, Laurent; Braconnot, Pascale; Ciais, Philippe; Yiou, Pascal; Guilyardi, Eric; Mignot, Juliette; Guivarch, Celine

    2015-01-01

    Climate models provide the opportunity to anticipate how the climate system may change due to anthropogenic activities during the 21. century. Studies are based on numerical simulations that explore the evolution of the mean climate and its variability according to different socio-economic scenarios. We present a selection of results from phase 5 of the Climate model intercomparison project (CMIP5) with an illustrative focus on the two French models that participated to this exercise. We describe the effects of human perturbations upon surface temperature, precipitation, the cryo-sphere, but also extreme weather events and the carbon cycle. Results show a number of robust features, on the amplitude and geographical patterns of the expected changes and on the processes at play in these changes. They also show the limitations of such a prospective exercise and persistent uncertainties on some key aspects. (authors)

  2. NEOLITHIC PLANT USE IN THE WESTERN MEDITERRANEAN REGION: PRELIMINARY RESULTS FROM THE AGRIWESTMED PROJECT

    Directory of Open Access Journals (Sweden)

    L. Peña-Chocarro

    2013-04-01

    Full Text Available This contribution focuses on the preliminary results of the AGRIWESTMED project which focuses on the archaeobotanical analyses of early Neolithic sites in the western Mediterranean region (both in Iberia and in northern Morocco. A large number of sites has been studied producing an interesting dataset of plant remains which places the earliest examples of domesticated plants in the second half of the 6th millennium cal BC. Plant diversity is high as it is shown by the large number of species represented: hulled and naked wheats, barley, peas, fava beans, vetches, lentils and grass peas. To more crops, poppy and flax, are also part of the first agricultural crops of the area. Although agriculture seems to occupy a first place in the production of food, gathering is well represented in the Moroccan sites where a large number of species has been identified. 

  3. Error Cost Escalation Through the Project Life Cycle

    Science.gov (United States)

    Stecklein, Jonette M.; Dabney, Jim; Dick, Brandon; Haskins, Bill; Lovell, Randy; Moroney, Gregory

    2004-01-01

    It is well known that the costs to fix errors increase as the project matures, but how fast do those costs build? A study was performed to determine the relative cost of fixing errors discovered during various phases of a project life cycle. This study used three approaches to determine the relative costs: the bottom-up cost method, the total cost breakdown method, and the top-down hypothetical project method. The approaches and results described in this paper presume development of a hardware/software system having project characteristics similar to those used in the development of a large, complex spacecraft, a military aircraft, or a small communications satellite. The results show the degree to which costs escalate, as errors are discovered and fixed at later and later phases in the project life cycle. If the cost of fixing a requirements error discovered during the requirements phase is defined to be 1 unit, the cost to fix that error if found during the design phase increases to 3 - 8 units; at the manufacturing/build phase, the cost to fix the error is 7 - 16 units; at the integration and test phase, the cost to fix the error becomes 21 - 78 units; and at the operations phase, the cost to fix the requirements error ranged from 29 units to more than 1500 units

  4. The wind forecasting improvement project. Description and results from the Southern study region

    Energy Technology Data Exchange (ETDEWEB)

    Freedman, Jeffrey [AWS Truepower LLC, Albany, NY (United States); Benjamin, Stan; Wilczak, James [National Oceanic and Atmospheric Administration, Washington, DC and Boulder, CO (United States)] [and others

    2012-07-01

    The Wind Forecasting Improvement Project (WFIP) is a multi-year U.S. Department of Energy (DOE)/National Oceanographic and Atmospheric Administration (NOAA) sponsored study whose main purpose is to demonstrate the scientific and economic benefits of additional atmospheric observations and model enhancements on wind energy production forecasts. WFIP covers two geographical regions of the U.S.: (1) the upper Great Plains, or Northern Study Area, and (2) most of Texas-the Southern Study Area. The Southern campaign is being led by AWS Truepower LLC, and includes a team of private, government, and academic partners with collective experience and expertise in all facets required to ensure a successful completion of the project. In addition presenting a summary of the state-of-the-art forecasting techniques used and phenomena-based analysis mentioned above, a brief synopsis of how ''lessons learned'' from the WFIP Southern Study Area can be articulated and applied to other wind resource regions will be described. (orig.)

  5. Modernization projects in Santa Maria e Garona

    International Nuclear Information System (INIS)

    Marcos, R.; Alutiz, J. I.; Garcia Sanchez, M.

    2011-01-01

    This article shows a vision of the Santa Maria de Garona power Plant modernization guidelines and it also presents the most significant projects deployed in the last decade at the power plant grouped in mechanics projects, electrical projects, instrumentations projects and IT projects. At the same time three projects are explained in more detail: the change of one of the main transformers, the evolution from paper recorders to paperless video graphic recorders and the new plant data information system. (Author)

  6. Introduction to the Project

    DEFF Research Database (Denmark)

    Kuhn, Johan M.; Malchow-Møller, Nikolaj; Sørensen, Anders

    In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two ...... important qualifications for the understanding of the contributions and results established in the project.......In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two...

  7. Stem cells show promising results for lymphoedema treatment

    DEFF Research Database (Denmark)

    Toyserkani, Navid Mohamadpour; Quaade, Marlene Louise; Sheikh, Søren Paludan

    2015-01-01

    Abstract Lymphoedema is a debilitating condition, manifesting in excess lymphatic fluid and swelling of subcutaneous tissues. Lymphoedema is as of yet still an incurable condition and current treatment modalities are not satisfactory. The capacity of mesenchymal stem cells to promote angiogenesis......, secrete growth factors, regulate the inflammatory process, and differentiate into multiple cell types make them a potential ideal therapy for lymphoedema. Adipose tissue is the richest and most accessible source of mesenchymal stem cells and they can be harvested, isolated, and used for therapy...... in a single stage procedure as an autologous treatment. The aim of this paper was to review all studies using mesenchymal stem cells for lymphoedema treatment with a special focus on the potential use of adipose-derived stem cells. A systematic search was performed and five preclinical and two clinical...

  8. Dissemination and Exploitation: Project Goals beyond Science

    Science.gov (United States)

    Hamann, Kristin; Reitz, Anja

    2017-04-01

    Dissemination and Exploitation are essential parts of public funded projects. In Horizon 2020 a plan for the exploitation and dissemination of results (PEDR) is a requirement. The plan should contain a clear vision on the objectives of the project in relation to actions for dissemination and potential exploitation of the project results. The actions follow the basic idea to spread the knowledge and results gathered within the project and face the challenge of how to bring the results into potentially relevant policy circle and how they impact the market. The plan follows the purpose to assess the impact of the project and to address various target groups who are interested in the project results. Simply put, dissemination concentrates on the transfer of knowledge and exploitation on the commercialization of the project. Beyond the question of the measurability of project`s impact, strategies within science marketing can serve purposes beyond internal and external communication. Accordingly, project managers are facing the challenge to implement a dissemination and exploitation strategy that ideally supports the identification of all partners with the project and matches the current discourse of the project`s content within the society, politics and economy. A consolidated plan might unite all projects partners under a central idea and supports the identification with the project beyond the individual research questions. Which applications, strategies and methods can be used to bring forward a PEDR that accompanies a project successfully and allows a comprehensive assessment of the project afterwards? Which hurdles might project managers experience in the dissemination process and which tasks should be fulfilled by the project manager?

  9. Risk Management in Construction Project: Taking Fairness into Account

    Science.gov (United States)

    Górecki, Jarosław; Bizon-Górecka, Jadwiga

    2017-10-01

    Risk management requires a comprehensive review of possible hazards, their possible outcomes as well as some recommendations about minimizing the risk. The study emphasises that the project risk management refers to an analysis of the risk factors and a creation of the strategy minimising negative effects of the risk. It was pointed out that a construction project is this kind of projects that can be defined as a unique process of high complexity (design documentation, various stages of creating the building), which has clearly defined time frames and a given financial limit. It is executed as a team work, by qualified or highly qualified specialists of different matters, for example masonry, precast, etc. Additionally, it requires a use of modern equipment and an adequate preparation of the investment. Therefore, the risk management focuses on the problems allowing for troubleshooting. A basis of the risk management is to recognise the fundamentals, which are crucial for the construction project management, i.e. an object perspective, including technological, supporting and management processes as well as an entity perspective - project stakeholders. Construction projects require also an acquaintance with the specificity of the branch. The article refers to the risk management in construction project and, in particular, a phenomenon of participants’ fairness in such projects. The problem of fairness of the entities involved in a project should be understood as a fair play, according to the arrangements agreed in a contract and compatible with current formal procedures and social rules. It was indicated that fairness can be treated as an important factor in predicting the success of such projects. Interviews conducted among contractors in Kuyavian-Pomeranian region showed varied fairness requirements put to individual participants of construction projects. The article presents results of the research. It shows a desired attitude of the surveyed enterprises

  10. The Esmeralda project

    International Nuclear Information System (INIS)

    Sophy, Y.

    1979-01-01

    This paper discusses the Esmeralda Project for studying extensive fires involving up to 70 metric tons of sodium. The design objectives and major features of the project are presented. The need for sodium fire testing on such a scale, results from problems of similitude arising from the extrapolation of previous results to fires liable to occur in large fast neutron reactors such as Super-Phenix. (author)

  11. PROJECT FINANCE AS A TOOL FOR THE IMPLEMENTATION OF INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    U. V. Vsyakih

    2015-02-01

    Full Text Available The article discusses the reasons for the insufficient use of project financing in the Russian Federation, the brief historical background for the project financing in Russia, as well as the main principles, types and stages of project financing. For results was used theoretical methods associated with the study of general and specialized literature, as well as methods of analysis and synthesis.

  12. First results of the Test-Bed Telescopes (TBT) project: Cebreros telescope commissioning

    Science.gov (United States)

    Ocaña, Francisco; Ibarra, Aitor; Racero, Elena; Montero, Ángel; Doubek, Jirí; Ruiz, Vicente

    2016-07-01

    The TBT project is being developed under ESA's General Studies and Technology Programme (GSTP), and shall implement a test-bed for the validation of an autonomous optical observing system in a realistic scenario within the Space Situational Awareness (SSA) programme of the European Space Agency (ESA). The goal of the project is to provide two fully robotic telescopes, which will serve as prototypes for development of a future network. The system consists of two telescopes, one in Spain and the second one in the Southern Hemisphere. The telescope is a fast astrograph with a large Field of View (FoV) of 2.5 x 2.5 square-degrees and a plate scale of 2.2 arcsec/pixel. The tube is mounted on a fast direct-drive mount moving with speed up to 20 degrees per second. The focal plane hosts a 2-port 4K x 4K back-illuminated CCD with readout speeds up to 1MHz per port. All these characteristics ensure good survey performance for transients and fast moving objects. Detection software and hardware are optimised for the detection of NEOs and objects in high Earth orbits (objects moving from 0.1-40 arcsec/second). Nominal exposures are in the range from 2 to 30 seconds, depending on the observational strategy. Part of the validation scenario involves the scheduling concept integrated in the robotic operations for both sensors. Every night it takes all the input needed and prepares a schedule following predefined rules allocating tasks for the telescopes. Telescopes are managed by RTS2 control software, that performs the real-time scheduling of the observation and manages all the devices at the observatory.1 At the end of the night the observing systems report astrometric positions and photometry of the objects detected. The first telescope was installed in Cebreros Satellite Tracking Station in mid-2015. It is currently in the commissioning phase and we present here the first results of the telescope. We evaluate the site characteristics and the performance of the TBT Cebreros

  13. Projective mapping

    DEFF Research Database (Denmark)

    Dehlholm, Christian; Brockhoff, Per B.; Bredie, Wender Laurentius Petrus

    2012-01-01

    by the practical testing environment. As a result of the changes, a reasonable assumption would be to question the consequences caused by the variations in method procedures. Here, the aim is to highlight the proven or hypothetic consequences of variations of Projective Mapping. Presented variations will include...... instructions and influence heavily the product placements and the descriptive vocabulary (Dehlholm et.al., 2012b). The type of assessors performing the method influences results with an extra aspect in Projective Mapping compared to more analytical tests, as the given spontaneous perceptions are much dependent......Projective Mapping (Risvik et.al., 1994) and its Napping (Pagès, 2003) variations have become increasingly popular in the sensory field for rapid collection of spontaneous product perceptions. It has been applied in variations which sometimes are caused by the purpose of the analysis and sometimes...

  14. ALIGNMENT BETWEEN THE TYPES OF PROJECTS AND SKILLS PROJECT MANAGEMENT IN THE AES SUL DISTRIBUIDORA GAÚCHA DE ENERGIA S.A

    Directory of Open Access Journals (Sweden)

    Greice de Bem Noro

    2011-10-01

    Full Text Available The pursuit of excellence and new markets and customers has driven companies to build methods to reach goals and improve their strategies and competitive advantages. Therefore, the project management (PM has played a key role in the organizations to adjust deadlines, organizing methods and decision-making. Although many companies already use the PM as resource, this research attempt to contribute to increase the area trough the debate about alignment of companies projects types with the choice of the leader, in line with their skills. The study was developed in the AES Sul Distribuidora Gaúcha de Energia SA (AES Sul and examined how the alignment of the types of projects and management competencies can add value to the organization. The methodological procedure is classified as qualitative, quantitative and descriptive, conducted through a case study. The main results show the need for adjustments between the essential skills and AES Sul types of projects, beyond find some gaps regarding the leaders competencies.

  15. Theory of Abelian projection

    International Nuclear Information System (INIS)

    Ogilvie, M.C.

    1999-01-01

    Analytic methods for Abelian projection are developed. A number of results are obtained related to string tension measurements. It is proven that even without gauge fixing, Abelian projection yields string tensions of the underlying non-Abelian theory. Strong arguments are given for similar results in the case where gauge fixing is employed. The methods used emphasize that the projected theory is derived from the underlying non-Abelian theory rather than vice versa. In general, the choice of subgroup used for projection is not very important, and need not be Abelian. While gauge fixing is shown to be in principle unnecessary for the success of Abelian projection, it is computationally advantageous for the same reasons that improved operators, e.g., the use of fat links, are advantageous in Wilson loop measurements. Two other issues, Casimir scaling and the conflict between projection and critical universality, are also discussed. copyright 1999 The American Physical Society

  16. Planning and Managing Drupal Projects

    CERN Document Server

    Nordin, Dani

    2011-01-01

    If you're a solo website designer or part of a small team itching to build interesting projects with Drupal, this concise guide will get you started. Drupal's learning curve has thrown off many experienced designers, particularly the way it handles design challenges. This book shows you the lifecycle of a typical Drupal project, with emphasis on the early stages of site planning. Learn how to efficiently estimate and set up your own project, so you can focus on ways to make your vision a reality, rather than let project management details constantly distract you. Plan and estimate your projec

  17. Project Management Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1995-04-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S ampersand M) and as quickly and economically as possible. Implementation and completion of the deactivation project will further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S ampersand M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities, that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project

  18. Steam generator replacement project in 2000

    International Nuclear Information System (INIS)

    Cerjak, J.; Holz, R.; Haus, J.; Gloaguen, C.

    1999-01-01

    NE Krsko has awarded the contract for the Steam Generator Replacement Project, which is one of the modernization projects in Krsko, to the Consortium of Siemens / Framatome in February 1998. This paper deals with the various aspects of the project: scope planning, engineering, preparation of modification packages for licensing, management, major techniques used, etc., showing also the status of the activities for the project which are scheduled to be performed in April through June 2000. The project is being performed on a turnkey basis, that means the Consortium is performing all engineering, preparation of the modification packages and site activities; NE Krsko is dealing with the licensing of the project.(author)

  19. Antibiotic consumption and resistance: results of the SPIN-UTI project of the GISIO-SItI.

    Science.gov (United States)

    Agodi, Antonella; Auxilia, Francesco; Barchitta, Martina; Brusaferro, Silvio; D'Errico, Marcello Mario; Montagna, Maria Teresa; Pasquarella, Cesira; Tardivo, Stefano; Mura, Ida

    2015-01-01

    To evaluate trends and association between antibiotic consumption and resistance during an eight-year period, from 2006 to 2013. Prospective multicenter study. Intensive Care Units (ICUs) participating in the four editions of the Italian nosocomial infections surveillance in the ICU Network (Sorveglianza Prospettica delle Infezioni Nosocomiali nelle Unità di Terapia Intensiva, SPIN-UTI project). The isolation density of selected species of microorganisms, antibiotic resistance rates (RRs), incidence density of resistant isolates and antimicrobial usage density were calculated. RRs of carbapenem-resistant Acinetobacter baumannii, of carbapenem-resistant Klebsiella pneumoniae, of third-generation cephalosporin (3GC)-resistant K. pneumoniae and of 3GC-resistant Escherichia coli showed significant increasing trends (p ≤0.001). The consumption of each antibiotic class varied with years, although not significantly. Significant strongly positive correlations were detected between RRs and antibiotic consumption. The present study describes high RRs and increasing trends of resistant microorganisms and highlights the need for continuous comprehensive strategies targeting not only the prudent use of antibiotics, but also infection control measures to limit the epidemic spread of resistant isolates.

  20. Experimental results showing the internal three-component velocity field and outlet temperature contours for a model gas turbine combustor

    CSIR Research Space (South Africa)

    Meyers, BC

    2011-09-01

    Full Text Available by the American Institute of Aeronautics and Astronautics Inc. All rights reserved ISABE-2011-1129 EXPERIMENTAL RESULTS SHOWING THE INTERNAL THREE-COMPONENT VELOCITY FIELD AND OUTLET TEMPERATURE CONTOURS FOR A MODEL GAS TURBINE COMBUSTOR BC Meyers*, GC... identifier c Position identifier F Fuel i Index L (Combustor) Liner OP Orifice plate Introduction There are often inconsistencies when comparing experimental and Computational Fluid Dynamics (CFD) simulations for gas turbine combustors [1...