WorldWideScience

Sample records for project reducing risk

  1. The KnowRISK project: Tools and strategies to reduce non-structural damage

    Science.gov (United States)

    Sousa Oliveira, Carlos; Lopes, Mário; Mota de Sá, Francisco; Amaral Ferreia, Mónica; Candeias, Paulo; Campos Costa, Alfredo; Rupakhety, Rajesh; Meroni, Fabrizio; Azzaro, Raffaele; D'Amico, Salvatore; Langer, Horst; Musacchio, Gemma; Sousa Silva, Delta; Falsaperla, Susanna; Scarfì, Luciano; Tusa, Giuseppina; Tuvé, Tiziana

    2016-04-01

    The project KnowRISK (Know your city, Reduce seISmic risK through non-structural elements) is financed by the European Commission to develop prevention measures that may reduce non-structural damage in urban areas. Pilot areas of the project are within the three European participating countries, namely Portugal, Iceland and Italy. Non-structural components of a building include all those components that are not part of the structural system, more specifically the architectural, mechanical, electrical, and plumbing systems, as well as furniture, fixtures, equipment, and contents. Windows, partitions, granite veneer, piping, ceilings, air conditioning ducts and equipment, elevators, computer and hospital equipment, file cabinets, and retail merchandise are all examples of non-structural components that are vulnerable to earthquake damage. We will use the experience gained during past earthquakes, which struck in particular Iceland, Italy and Portugal (Azores). Securing the non-structural elements improves the safety during an earthquake and saves lives. This paper aims at identifying non-structural seismic protection measures in the pilot areas and to develop a portfolio of good practices for the most common and serious non-structural vulnerabilities. This systematic identification and the portfolio will be achieved through a "cross-knowledge" strategy based on previous researches, evidence of non-structural damage in past earthquakes. Shake table tests of a group of non-structural elements will be performed. These tests will be filmed and, jointly with portfolio, will serve as didactic supporting tools to be used in workshops with building construction stakeholders and in risk communication activities. A Practical Guide for non-structural risk reduction will be specifically prepared for citizens on the basis of the outputs of the project, taking into account the local culture and needs of each participating country.

  2. The KnowRISK project - Know your city, Reduce seISmic risK through non-structural elements

    Science.gov (United States)

    Sousa Oliveria, Carlos; Amaral Ferreira, Mónica; Lopez, Mário; Sousa Silva, Delta; Musacchio, Gemma; Rupakhety, Rajesh; Falsaperla, Susanna; Meroni, Fabrizio; Langer, Horst

    2016-04-01

    Historically, there is a tendency to focus on seismic structural performance of buildings, neglecting the potential for damage of non-structural elements. In particular, non-structural elements of buildings are their architectural parts (i.e. partitions, ceilings, cladding), electrical and mechanical components (i.e., distribution panels, piping, plumbing), and contents (e.g., furniture, bookcases, computers and desktop equipment). Damage of these elements often contributes significantly to earthquake impacts. In the 1999 Izmit Earthquake, Turkey, 50% of the injuries and 3% of human losses were caused by non-structural failures. In the 2010-2011 Christchurch Earthquakes (New Zealand), 40% of building damage was induced by non-structural malfunctions. Around 70%-85% of construction cost goes into these elements, and their damage can strongly influence the ability of communities to cope with and recover from earthquakes. The project Know your city, Reduce seISmic risK through non-structural elements (KnowRISK) aims at facilitating local communities' access to expert knowledge on non-structural seismic protection solutions. The project will study seismic scenarios critical for non-structural damage, produce a portfolio of non-structural protection measures and investigate the level of awareness in specific communities. We will implement risk communication strategies that will take into account the social and cultural background and a participatory approach to raise awareness in local communities. The paradox between the progress of scientific knowledge and the ongoing increase of losses from natural disasters worldwide is a well-identified gap in the UN Hyogo Framework for Action 2005-2015, in which one of the main priorities is the investment on "knowledge use, innovation and education to build a culture of safety and resilience". The KnowRISK is well aligned with these priorities and will contribute to participatory action aimed at: i) transferring expert knowledge

  3. Reducing Risk for the Next Generation Nuclear Plant

    Energy Technology Data Exchange (ETDEWEB)

    John M. Beck II; Harold J. Heydt; Emmanuel O. Opare; Kyle B. Oswald

    2010-07-01

    The Next Generation Nuclear Plant (NGNP) Project, managed by the Idaho National Laboratory (INL), is directed by the Energy Policy Act of 2005, to research, develop, design, construct, and operate a prototype forth generation nuclear reactor to meet the needs of the 21st Century. As with all large projects developing and deploying new technologies, the NGNP has numerous risks that need to be identified, tracked, mitigated, and reduced in order for successful project completion. A Risk Management Plan (RMP) was created to outline the process the INL is using to manage the risks and reduction strategies for the NGNP Project. Integral to the RMP is the development and use of a Risk Management System (RMS). The RMS is a tool that supports management and monitoring of the project risks. The RMS does not only contain a risk register, but other functionality that allows decision makers, engineering staff, and technology researchers to review and monitor the risks as the project matures.

  4. Reducing Risk for the Next Generation Nuclear Plant

    International Nuclear Information System (INIS)

    Beck, John M. II; Heydt, Harold J.; Opare, Emmanuel O.; Oswald, Kyle B.

    2010-01-01

    The Next Generation Nuclear Plant (NGNP) Project, managed by the Idaho National Laboratory (INL), is directed by the Energy Policy Act of 2005, to research, develop, design, construct, and operate a prototype forth generation nuclear reactor to meet the needs of the 21st Century. As with all large projects developing and deploying new technologies, the NGNP has numerous risks that need to be identified, tracked, mitigated, and reduced in order for successful project completion. A Risk Management Plan (RMP) was created to outline the process the INL is using to manage the risks and reduction strategies for the NGNP Project. Integral to the RMP is the development and use of a Risk Management System (RMS). The RMS is a tool that supports management and monitoring of the project risks. The RMS does not only contain a risk register, but other functionality that allows decision makers, engineering staff, and technology researchers to review and monitor the risks as the project matures.

  5. Risk Management and Uncertainty in Infrastructure Projects

    DEFF Research Database (Denmark)

    Harty, Chris; Neerup Themsen, Tim; Tryggestad, Kjell

    2014-01-01

    The assumption that large complex projects should be managed in order to reduce uncertainty and increase predictability is not new. What is relatively new, however, is that uncertainty reduction can and should be obtained through formal risk management approaches. We question both assumptions...... by addressing a more fundamental question about the role of knowledge in current risk management practices. Inquiries into the predominant approaches to risk management in large infrastructure and construction projects reveal their assumptions about knowledge and we discuss the ramifications these have...... for project and construction management. Our argument and claim is that predominant risk management approaches tends to reinforce conventional ideas of project control whilst undermining other notions of value and relevance of built assets and project management process. These approaches fail to consider...

  6. Risk-profile modification of energy projects

    International Nuclear Information System (INIS)

    Larson, B.O.

    1992-01-01

    The commodity futures and swaps markets are thought to be the invention of speculators, the bane of the oil business, or possibly something confined to finance departments of major corporations. In actuality, they should be considered more as an insurance vehicle and can be used at the project level to modify the risk profile of a property. In this context, an increased familiarity with them can be useful for an engineer. Either futures of swaps can be used to guarantee or modify product prices. While this does not necessarily maximize cash flow or present worth, it can protect a project or company for several years from downside price risk, thereby reducing the risk of the venture. This can be particularly important if lower product prices would cause unacceptable cash flows or net incomes. This paper reports that reducing risk by limiting downside price exposure could alter budgeting decisions, allow continued or expanded operations of a particular property, or increase debt capacity

  7. Project Risk Management

    Science.gov (United States)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  8. Evaluating shielding effectiveness for reducing space radiation cancer risks

    International Nuclear Information System (INIS)

    Cucinotta, Francis A.; Kim, Myung-Hee Y.; Ren, Lei

    2006-01-01

    We discuss calculations of probability distribution functions (PDF) representing uncertainties in projecting fatal cancer risk from galactic cosmic rays (GCR) and solar particle events (SPE). The PDFs are used in significance tests for evaluating the effectiveness of potential radiation shielding approaches. Uncertainties in risk coefficients determined from epidemiology data, dose and dose-rate reduction factors, quality factors, and physics models of radiation environments are considered in models of cancer risk PDFs. Competing mortality risks and functional correlations in radiation quality factor uncertainties are included in the calculations. We show that the cancer risk uncertainty, defined as the ratio of the upper value of 95% confidence interval (CI) to the point estimate is about 4-fold for lunar and Mars mission risk projections. For short-stay lunar missions ( 180d) or Mars missions, GCR risks may exceed radiation risk limits that are based on acceptable levels of risk. For example, the upper 95% CI exceeding 10% fatal risk for males and females on a Mars mission. For reducing GCR cancer risks, shielding materials are marginally effective because of the penetrating nature of GCR and secondary radiation produced in tissue by relativistic particles. At the present time, polyethylene or carbon composite shielding cannot be shown to significantly reduce risk compared to aluminum shielding based on a significance test that accounts for radiobiology uncertainties in GCR risk projection

  9. Risk reduction of international mining projects by means of investor consortia and diversification of external financing

    International Nuclear Information System (INIS)

    Kirchner, C.

    1982-01-01

    Investors and creditors of international mining projects bear specific risks which may be reduced by means of forming investor and financing consortia. Risk is defined for each actor separately. Project risk and investor risk respectively credit risk are useful categories in order to analyze risk reduction. In each case formation of consortia has a positive influence on the economic viability of the project, and thus reduces the project risk. Furthermore, formation of consortia leads to better compliance of the host country of the mining project with the project and financing agreements. Thus, investor and credit risk may be reduced. (orig.) [de

  10. Adoption of Building Information Modelling in project planning risk management

    Science.gov (United States)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  11. Clean development mechanism projects and portfolio risks

    International Nuclear Information System (INIS)

    Matsuhashi, Ryuji; Fujisawa, Sei; Mitamura, Wataru; Momobayashi, Yutaka; Yoshida, Yoshikuni

    2004-01-01

    Clean development mechanism (CDM) is expected to facilitate technology transfer from developed to developing countries as well as to economically reduce greenhouse gas emissions. In this article, we explore effective institutions to activate CDM projects. For this purpose, we have estimated internal rate of return (IRR) and other indicators on profitability for 42 CDM or JI projects, taking account of volatilities in the price of certified emission reductions (CER). As a result of Monte Carlo simulations, expected values and standard deviations in the IRR of the projects were quantitatively shown. Then we evaluated various risks in CDM, concluding that diversification of investment is an effective way to suppress these risks. Therefore securitization of CDM finance is proposed as a means of facilitating the diversification of investment. Namely, we present the concept of a CDM bond, which is a project bond with CER. We also investigated the role of governments to suppress risks in CDM. Referring to CERUPT, initiated by the Netherlands' government, the institution of 'insured CERUPT' is proposed to suppress downside risks in the IRR of the projects. We concluded that it is possible to make CDM projects viable by the 'insured CERUPT' and CDM bond

  12. Risk Assessment of Engineering Project Financing Based on PPP Model

    Directory of Open Access Journals (Sweden)

    Ma Qiuli

    2017-01-01

    Full Text Available At present, the project financing channel is single, and the urban facilities are in short supply, and the risk assessment and prevention mechanism of financing should be further improved to reduce the risk of project financing. In view of this, the fuzzy comprehensive evaluation model of project financing risk which combined the method of fuzzy comprehensive evaluation and analytic hierarchy process is established. The scientificalness and effectiveness of the model are verified by the example of the world port project in Luohe city, and it provides basis and reference for engineering project financing based on PPP mode.

  13. Reducing cancer risk in rural communities through supermarket interventions.

    Science.gov (United States)

    McCool, Barent N; Lyford, Conrad P; Hensarling, Natalie; Pence, Barbara; McCool, Audrey C; Thapa, Janani; Belasco, Eric; Carter, Tyra M

    2013-09-01

    Cancer risk is high, and prevention efforts are often minimal in rural communities. Feasible means of encouraging lifestyles that will reduce cancer risk for residents of rural communities are needed. This project developed and tested a model that could be feasibly adopted by rural communities to reduce cancer risk. This model focuses on incorporating multi-faceted cancer risk education in the local supermarket. As the supermarket functions both as the primary food source and an information source in small rural communities, the supermarket focus encourages the development of a community environment supportive of lifestyles that should reduce residents' risk for cancer. The actions taken to implement the model and the challenges that communities would have in implementing the model are identified.

  14. Project Documentation as a Risk for Public Projects

    Directory of Open Access Journals (Sweden)

    Vladěna Štěpánková

    2015-08-01

    Full Text Available Purpose of the article: The paper presents the different methodologies used for creating documentation and focuses on public projects and their requirements for this documentation. Since documentation is also incorporated in the overall planning of the project and its duration is estimated using expert qualified estimate, can any change in this documentation lead to project delays, or increase its cost as a result of consuming administration, and therefore the documentation is seen as a risk, which may threaten the project as a public contract by which a company trying to achieve and obtains it, and generally any project. Methodology/methods: There are used methods of obtaining information in this paper. These are mainly structured interviews in combination with a brainstorming, furthermore also been used questionnaire for companies dealing with public procurement. As a data processing program was used MS Excel and basic statistical methods based on regression analysis. Scientific aim: The article deals with the construction market in the Czech Republic and examines the impact of changes in project documentation of public projects on their turnover. Findings: In this paper we summarize the advantages and disadvantages of having project documentation. In the case of public contracts and changes in legislation it is necessary to focus on creating documentation in advance, follow the new requirements and try to reach them in the shortest possible time. Conclusions: The paper concludes with recommendations on how to proceed, if these changes and how to reduce costs, which may cause the risk of documentation.

  15. Risk Management Improvement of Engineering Projects in Woodworking Industry

    Directory of Open Access Journals (Sweden)

    Simona Bartkutė

    2014-02-01

    Full Text Available Risk is a complex phenomenon that has physical, monetary, cultural and social dimensions. Every company wants tosave money, time, increase quality, optimise manufacturing, but each factor may involve different risks with different influenceto company, its reputation. The aim of the research is to find better risk management improvement decisions, using techniquesthat could help to reduce risk impact in wood-based nonstandard production with shorter project time, smoother design process,lower costs, better project coordination, increased ability to manage problems, technical solutions.

  16. Risk Management for New Product Development Projects in Food Industry

    Directory of Open Access Journals (Sweden)

    Porananond, D.

    2014-07-01

    Full Text Available Project risk management provides a guideline for decision making in new product development (NPD projects, reducing uncertainty and increasing success rate. However, the acceptance of formal risk management applications in industry, especially for NPD projects is still in question. A study of a food conglomerate in Thailand found that only 9% of NPD projects used a systematic approach for managing risk. 61% of the projects realised the importance of risk management, while the remaining 30% did not involve risk management at all. This study aims to develop a risk management model for NPD projects in the food industry. The first section of this paper reviews the literature on risk management theory, including international standards for risk and project management (ISO31000 and ISO21500, publications for the Project Management Body of Knowledge (PMBOK, by a professional organisation the Project Management Institute (PMI, and also academic research. 182 academic papers, published between January 2002 and August 2012 were selected. The second part interviews conducted with eight NPD experts from five of the major food manufacturers in Thailand to examine their risk management practices and problems. Conclusions are made on five topics : classification of research method, project type and industrial segment, distribution of articles by region, tools & techniques for risk management and risk factors in projects. Specific requirements of risk management for NPD projects in the food industry are identified. A risk management model and the concept of risk management applications for the food industry are proposed.

  17. ANALYSIS OF ECONOMIC RISK IN EUROPEAN INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    Margareta Stela FLORESCU

    2012-06-01

    Full Text Available Risk is a reality of the economic environment, with consequences which cannot always be foreseen or anticipated. Risk management becomes more stringent as potential exo/endogenous vulnerability factors are rapidly increasing. Identifying risk areas, structuring risk factors and defining their probability, optimal management of resources in order to reduce risk factors, creating alternatives for each high-probability risk factor are part of project risk management. Risk is quantified through probability and incidence and is assessed using quantitative and qualitative methods.

  18. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  19. Risk-informed ranking of engineering projects

    International Nuclear Information System (INIS)

    Jyrkama, M.; Pandey, M.

    2011-01-01

    Refurbishment planning requires prudent investment decisions with respect to the various systems and components at the station. These decisions are influenced by many factors, including engineering, safety, regulatory, economic, and political constraints. From an engineering perspective, the concept of cost-benefit analysis is a common way to allocate capital among various projects. Naturally, the 'best' or optimal project should have the lowest cost and the highest benefit. In the context of risk-informed decision making (RIDM), a process that has been widely embraced by the global nuclear community, the costs and benefits must further be 'weighted' by probabilities to estimate the underlying risk associated with the various planning alternatives. The main purpose of this study is to illustrate how risk and reliability information can be integrated into the refurbishment planning process to facilitate more objective and transparent investment decisions. The methodology is based on the concept of generation risk assessment (GRA) which provides a systematic approach for balancing investment costs with the reduction in overall financial risk. In addition to reliability predictions, the model provides estimates for the level of risk reduction associated with each system/project and also the break-even point for investment. This information is vital for project ranking, and helps to address the key question of whether capital investment should be made in the most risk critical systems, or in systems that reduce the overall risk the most. The application of the proposed methodology requires only basic information regarding the current reliability of each engineering system, which should be readily available from plant records and routine condition assessments. Because the methodology can be readily implemented in a Microsoft Excel spreadsheet, all plausible (e.g., bounding) planning scenarios, with or without investment, can also be generated quickly and easily, while

  20. A Fuzzy Comprehensive Evaluation Model for Sustainability Risk Evaluation of PPP Projects

    Directory of Open Access Journals (Sweden)

    Libiao Bai

    2017-10-01

    Full Text Available Evaluating the sustainability risk level of public–private partnership (PPP projects can reduce project risk incidents and achieve the sustainable development of the organization. However, the existing studies about PPP projects risk management mainly focus on exploring the impact of financial and revenue risks but ignore the sustainability risks, causing the concept of “sustainability” to be missing while evaluating the risk level of PPP projects. To evaluate the sustainability risk level and achieve the most important objective of providing a reference for the public and private sectors when making decisions on PPP project management, this paper constructs a factor system of sustainability risk of PPP projects based on an extensive literature review and develops a mathematical model based on the methods of fuzzy comprehensive evaluation model (FCEM and failure mode, effects and criticality analysis (FMECA for evaluating the sustainability risk level of PPP projects. In addition, this paper conducts computational experiment based on a questionnaire survey to verify the effectiveness and feasibility of this proposed model. The results suggest that this model is reasonable for evaluating the sustainability risk level of PPP projects. To our knowledge, this paper is the first study to evaluate the sustainability risk of PPP projects, which would not only enrich the theories of project risk management, but also serve as a reference for the public and private sectors for the sustainable planning and development. Keywords: sustainability risk eva

  1. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  2. Effect of risk aversion on prioritizing conservation projects.

    Science.gov (United States)

    Tulloch, Ayesha I T; Maloney, Richard F; Joseph, Liana N; Bennett, Joseph R; Di Fonzo, Martina M I; Probert, William J M; O'Connor, Shaun M; Densem, Jodie P; Possingham, Hugh P

    2015-04-01

    Conservation outcomes are uncertain. Agencies making decisions about what threat mitigation actions to take to save which species frequently face the dilemma of whether to invest in actions with high probability of success and guaranteed benefits or to choose projects with a greater risk of failure that might provide higher benefits if they succeed. The answer to this dilemma lies in the decision maker's aversion to risk--their unwillingness to accept uncertain outcomes. Little guidance exists on how risk preferences affect conservation investment priorities. Using a prioritization approach based on cost effectiveness, we compared 2 approaches: a conservative probability threshold approach that excludes investment in projects with a risk of management failure greater than a fixed level, and a variance-discounting heuristic used in economics that explicitly accounts for risk tolerance and the probabilities of management success and failure. We applied both approaches to prioritizing projects for 700 of New Zealand's threatened species across 8303 management actions. Both decision makers' risk tolerance and our choice of approach to dealing with risk preferences drove the prioritization solution (i.e., the species selected for management). Use of a probability threshold minimized uncertainty, but more expensive projects were selected than with variance discounting, which maximized expected benefits by selecting the management of species with higher extinction risk and higher conservation value. Explicitly incorporating risk preferences within the decision making process reduced the number of species expected to be safe from extinction because lower risk tolerance resulted in more species being excluded from management, but the approach allowed decision makers to choose a level of acceptable risk that fit with their ability to accommodate failure. We argue for transparency in risk tolerance and recommend that decision makers accept risk in an adaptive management

  3. Overlapping Boundaries of the Project Time Management and Project Risk Management

    Directory of Open Access Journals (Sweden)

    Marius PODEAN

    2010-01-01

    Full Text Available Based on utility function, milestones during project and/or the end of projects or programme may be categorized in what are called soft-deadline and hard-deadline. In contrast with the soft-end projects, the hard-end projects posses a decrease of utility function with a vertical asymptote character around the deadline for project completion. In extreme situations, the utility function itself may fall under zero (projects may generate losses to both constructor and customer. Existing risk analysis methodologies observe risks from monetary terms. The typical risks are correlated with an increase in final project costs. In order to estimate harddeadline milestones and/or end of projects or programme is critical to employ the time dimension rather than the typical cost-based risk analysis. Here, we comprehensively describe a structured methodology that focuses on minimizing and mitigating project specific delay risks. The method may supplement existing cost-based risk analysis in projects. We aim to elegantly combine moderation techniques to reveal the intrinsic risk of the projects. In addition to the technical risks, the moderation techniques are able to bring evidence of risks as the team efficacy, diverse un-correlations or miss-understanding about the roles of the team members in the team – most of the project soft risk. Described methodology encourages the common understanding of risks for participants, crystallizing the essence of what can go wrong in complex situations and where the opportunities can be unlocked.

  4. Project risk management: A review of an institutional project life cycle

    Directory of Open Access Journals (Sweden)

    Wanjiru Gachie

    2017-11-01

    Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects

  5. Systems approach to project risk management

    Energy Technology Data Exchange (ETDEWEB)

    Kindinger, J. P. (John P.)

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  6. Risk profile modification of energy projects

    International Nuclear Information System (INIS)

    Larson, B.O.

    1992-01-01

    The commodity futures and swaps markets are thought by some to be the invention of speculators, the bane of the oil business, or possibly something confined to finance departments of major corporations. In actuality, they should be considered more as insurance and can be utilized at the project level to modify the risk profile of a property. In this context, an increased familiarity with them can be useful for an engineer. This paper reports that either futures or swaps can be used to guarantee or modify product prices, an accomplishment very difficult or impossible to duplicate through other means, particularly with such integrity. Participation in futures or swaps does not necessarily maximize cashflow or present worth, it can either guarantee the price, put a minimum price in place or offer a combination of the above. A project or company can be protected for several years from downside price risk using swaps. Not being subject to market price swings substantially reduces the risk of the venture. This can be particularly important if lower product prices would cause unacceptable cashflows or net incomes

  7. Comparison of additive (absolute) risk projection models and multiplicative (relative) risk projection models in estimating radiation-induced lifetime cancer risk

    International Nuclear Information System (INIS)

    Kai, Michiaki; Kusama, Tomoko

    1990-01-01

    Lifetime cancer risk estimates depend on risk projection models. While the increasing lengths of follow-up observation periods of atomic bomb survivors in Hiroshima and Nagasaki bring about changes in cancer risk estimates, the validity of the two risk projection models, the additive risk projection model (AR) and multiplicative risk projection model (MR), comes into question. This paper compares the lifetime risk or loss of life-expectancy between the two projection models on the basis of BEIR-III report or recently published RERF report. With Japanese cancer statistics the estimates of MR were greater than those of AR, but a reversal of these results was seen when the cancer hazard function for India was used. When we investigated the validity of the two projection models using epidemiological human data and animal data, the results suggested that MR was superior to AR with respect to temporal change, but there was little evidence to support its validity. (author)

  8. Occupational emerging risks affecting international virtual project Team Results

    Directory of Open Access Journals (Sweden)

    Dumitraşcu-Băldău Iulia

    2017-01-01

    Full Text Available The expansion of internet access, high-speed connection services, collaborative work platforms and tools, allowed employees to interact virtually offering companies the possibility to develop projects around the world, reducing operational costs and gain competitive advantage. Realizing the advantages and disadvantages of developing a project team in an international virtual work environment, requires adopting specific strategies to construct an effective team and ensure the project success. One of the most important disadvantages that we identified is that the new work environment brings new risks for both team members and managers. So, it becomes mandatory to identify and analyze the occupational emerging risks and their impact on the productivity of virtual team members, in order to prevent them efficiently and to ensure the safety and health of employees in a virtual working environment. This paper aims to highlight the necessity for project managers and organizations, to include in their specific project strategies, an efficient occupational risks management in the virtual workplace, to obtain a continuously improved virtual working environment, so to achieve a high performance from virtual employees.

  9. Proactive information provision for reducing social construct risk of nuclear facility

    International Nuclear Information System (INIS)

    Kitamura, Masaharu; Takahashi, Makoto; Hashizume, Hidetoshi; Shiraishi, Natsuki; Yagi, Ekou

    2006-01-01

    Outlines of, and the empirical observations from, an action research project aiming at improvement of relationship between nuclear community and the public have been reported in this paper. Ultimate goal of the project is effective reduction of social construct risk of nuclear power plants. As an initial approach to the goal, a proactive information provision scheme has been designed based on the knowledge acquired during our previous attempt of public communication named repetitive dialogue forum. The information contents consistent with the actual need of local citizens has been derived from the previous experiences and provided in the present project. Although the project is in its incipient stage, the observations are informative enough to develop the project further to attain the ultimate purpose of reducing the social construct component of technological risk of nuclear facilities. (author)

  10. safety risk management based on fuzzy logic at underground projects

    Directory of Open Access Journals (Sweden)

    Farhad Taherkhani

    2017-11-01

    Conclusion: In the present article, a new model was developed to calculate the probability of occurrence of the event, which so far has not been addressed in other studies. Finally, effective measures can be taken to reduce the risk of a project by eliminating the high risk factors.

  11. Sustainability Risk Evaluation for Large-Scale Hydropower Projects with Hybrid Uncertainty

    Directory of Open Access Journals (Sweden)

    Weiyao Tang

    2018-01-01

    Full Text Available As large-scale hydropower projects are influenced by many factors, risk evaluations are complex. This paper considers a hydropower project as a complex system from the perspective of sustainability risk, and divides it into three subsystems: the natural environment subsystem, the eco-environment subsystem and the socioeconomic subsystem. Risk-related factors and quantitative dimensions of each subsystem are comprehensively analyzed considering uncertainty of some quantitative dimensions solved by hybrid uncertainty methods, including fuzzy (e.g., the national health degree, the national happiness degree, the protection of cultural heritage, random (e.g., underground water levels, river width, and fuzzy random uncertainty (e.g., runoff volumes, precipitation. By calculating the sustainability risk-related degree in each of the risk-related factors, a sustainable risk-evaluation model is built. Based on the calculation results, the critical sustainability risk-related factors are identified and targeted to reduce the losses caused by sustainability risk factors of the hydropower project. A case study at the under-construction Baihetan hydropower station is presented to demonstrate the viability of the risk-evaluation model and to provide a reference for the sustainable risk evaluation of other large-scale hydropower projects.

  12. Project Portfolio Risk Identification and Analysis, Considering Project Risk Interactions and Using Bayesian Networks

    Directory of Open Access Journals (Sweden)

    Foroogh Ghasemi

    2018-05-01

    Full Text Available An organization’s strategic objectives are accomplished through portfolios. However, the materialization of portfolio risks may affect a portfolio’s sustainable success and the achievement of those objectives. Moreover, project interdependencies and cause–effect relationships between risks create complexity for portfolio risk analysis. This paper presents a model using Bayesian network (BN methodology for modeling and analyzing portfolio risks. To develop this model, first, portfolio-level risks and risks caused by project interdependencies are identified. Then, based on their cause–effect relationships all portfolio risks are organized in a BN. Conditional probability distributions for this network are specified and the Bayesian networks method is used to estimate the probability of portfolio risk. This model was applied to a portfolio of a construction company located in Iran and proved effective in analyzing portfolio risk probability. Furthermore, the model provided valuable information for selecting a portfolio’s projects and making strategic decisions.

  13. Project risk definition and measurement in a not-for-profit setting.

    Science.gov (United States)

    Gapenski, L C

    1992-11-01

    The health care finance literature on capital investment decisions generally applies conventional market risk concepts without distinguishing between proprietary and not-for-profit forms of organization. Since proprietary firms have shareholder wealth maximization as their primary goal, a project's relevant risk is its contribution to the riskiness of the equity investors' well diversified stock portfolios, or its market risk. However, not-for-profit organizations do not have shareholder wealth maximization as their primary goal, and thus market risk concepts are not applicable. Rather, the relevant risk in a not-for-profit setting is a project's corporate risk; that is, the project's contribution to the riskiness of the organization. The difference in risk definition and measurement between proprietary and not-for-profit firms has two implications for managerial decisions: (1) in making capital investment decisions, a manager must define and measure a project's riskiness on the basis of the firm's organizational form; and (2) although diversification for the sole purpose of risk reduction is not a valid rationale for proprietary firms because stockholders can achieve the same result at less cost, risk-reducing diversification does make sense for not-for-profit firms.

  14. General risks for tunnelling projects: An overview

    Science.gov (United States)

    Siang, Lee Yong; Ghazali, Farid E. Mohamed; Zainun, Noor Yasmin; Ali, Roslinda

    2017-10-01

    Tunnels are indispensable when installing new infrastructure as well as when enhancing the quality of existing urban living due to their unique characteristics and potential applications. Over the past few decades, there has been a significant increase in the building of tunnels, world-wide. Tunnelling projects are complex endeavors, and risk assessment for tunnelling projects is likewise a complex process. Risk events are often interrelated. Occurrence of a technical risk usually carries cost and schedule consequences. Schedule risks typically impact cost escalation and project overhead. One must carefully consider the likelihood of a risk's occurrence and its impact in the context of a specific set of project conditions and circumstances. A project's goals, organization, and environment impacts in the context of a specific set of project conditions and circumstances. Some projects are primarily schedule driven; other projects are primarily cost or quality driven. Whether a specific risk event is perceived fundamentally as a cost risk or a schedule risk is governed by the project-specific context. Many researchers have pointed out the significance of recognition and control of the complexity, and risks of tunnelling projects. Although all general information on a project such as estimated duration, estimated cost, and stakeholders can be obtained, it is still quite difficult to accurately understand, predict and control the overall situation and development trends of the project, leading to the risks of tunnelling projects. This paper reviews all the key risks for tunnelling projects from several case studies that have been carried out by other researchers. These risks have been identified and reviewed in this paper. As a result, the current risk management plan in tunnelling projects can be enhanced by including all these reviewed risks as key information.

  15. Investment Decision Support for Engineering Projects Based on Risk Correlation Analysis

    Directory of Open Access Journals (Sweden)

    Yan Liu

    2012-01-01

    Full Text Available Investment decisions are usually made on the basis of the subjective judgments of experts subjected to the information gap during the preliminary stages of a project. As a consequence, a series of errors in risk prediction and/or decision-making will be generated leading to out of control investment and project failure. In this paper, the variable fuzzy set theory and intelligent algorithms integrated with case-based reasoning are presented. The proposed algorithm manages the numerous fuzzy concepts and variable factors of a project and also sets up the decision-making process in accordance with past cases and experiences. Furthermore, it decreases the calculation difficulty and reduces the decision-making reaction time. Three types of risk correlations combined with different characteristics of engineering projects are summarized, and each of these correlations is expounded at the project investment decision-making stage. Quantitative and qualitative change theories of variable fuzzy sets are also addressed for investment risk warning. The approach presented in this paper enables the risk analysis in a simple and intuitive manner and realizes the integration of objective and subjective risk assessments within the decision-makers' risk expectation.

  16. Renewable fuels: Policy effectiveness and project risk

    International Nuclear Information System (INIS)

    Leach, Andrew; Doucet, Joseph; Nickel, Trevor

    2011-01-01

    This paper examines the impact of government policy on the risk profile of a small ethanol production facility. We derive four key results from a simulation model. First, we show that commodity price risk may discourage investment in a project, despite a positive expected rate of return. Second, we show that political uncertainty may have significant impacts on the risk profile of a project. Next, we show that using only production subsidies to attract investors is expensive, since the financial assistance is paid regardless of whether the plant is operating under positive or negative financial conditions. Finally, we show that a capital grant provides a valuable complement to a subsidy, because the grant reduces the amount of value investors must put at risk, and increases their leverage thereby enhancing returns, while the subsidy mitigates commodity price risk. Our results show that compared to a subsidy-only approach, a grant and subsidy combination provides an investment environment with similar downside protection and expected returns for less than 60% of the cost. Further, we show that the two policy tools combined yield a superior investment environment to that created by an equivalent or greater total investment deployed entirely in either of the policy tools without the other. - Research highlights: → We find that government policy may increase both project returns and risk. → We find a policy of capital grants combined with an output price support to be preferred. → Price supports alone will tend to reward those plants which need them the least.

  17. Risk management in nuclear projects

    International Nuclear Information System (INIS)

    Salles, Claudio J.R.

    2002-01-01

    The risk management will be defined by different aspects: danger or loss possibility, or responsibility for damage. The risk management is one stage of project management. The risk management is a continuous process of planning, identification, quantification, answer and risk control to maximize the success potential of activity. The reduction of risk is part of priority establishment. This work will indicate how introduce this important instrument in the management of nuclear projects. (author)

  18. Risk variables in evaluation of transport projects

    Science.gov (United States)

    Vařbuchta, Petr; Kovářová, Hana; Hromádka, Vít; Vítková, Eva

    2017-09-01

    Depending on the constantly increasing demands on assessment of investment projects, especially assessment of large-scale projects in transport and important European projects with wide impacts, there is constantly increasing focus on risk management, whether to find mitigations, creating corrective measures or their implementation in assessment, especially in the context of Cost-Benefit analysis. To project assessment is often used implementation of certain risk variables, which can generate negative impacts of project outputs in framework of assess. Especially in case of transportation infrastructure projects is taken much emphasis on the influence of risk variables. However, currently in case of assessment of transportation projects is in Czech Republic used a few risk variables, which occur in the most projects. This leads to certain limitation in framework of impact assessment of risk variables. This papers aims to specify a new risk variables and process of applying them to already executed project assessment. Based on changes generated by new risk variables will be evaluated differences between original and adapted assessment.

  19. Study On Risk Handling Strategy Of Road Contruction Projects In Jayapura City

    Directory of Open Access Journals (Sweden)

    Irianto

    2017-08-01

    Full Text Available Project risk is an event or an uncertain condition which if it appears will have a threat on the project object. Many contractors still do not understand the threats that occur in the project they still assume that risks are always harmful. Based on data from the Papua Public Works procurement service that the implementation of road improvement projects always faces problems. This research is an explorative and descriptive study which explores the risks threats that occur in the project from the contractors perspective in Jayapura Papua Province Indonesia. The object of this research is the company contractor involved in the implementation of road improvement project in Jayapura whereas the respondent is the project manager and the field supervisor involved in the implementation of road improvement project The analysis result shows that the overall level of risk is in very low category and the biggest risks affecting contractors in sequence are 1 material delays from suppliers 2 material inventories 3 design difficulties 4 incorrectly shipped material volumes 5 changes to specifications by the owner 6 difficulty in obtaining materials and equipment 7 material price increases 8 over quality 9 damage to machine tools 10 weakening the bearing capacity of subgrade soil. While the response to risks threats that occur in road improvement projects is to reduce and avoid.

  20. Integrated Risk Management Within NASA Programs/Projects

    Science.gov (United States)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  1. Risk assessment and management in IOR projects

    International Nuclear Information System (INIS)

    Goodyear, S.G.; Gregory, A.T.

    1994-01-01

    The application of IOR techniques is one of the investment opportunities open to Exploration and Production companies. A project will only go forward if the perceived balance between the rewards and the risks is acceptable. IOR projects may be ruled out because they are considered to involve significantly higher risks than conventional developments. Therefore, some means of evaluating the actual level of risk may be required if the full economic benefits from IOR techniques are to be realized. Risk assessment is a key element in safety cases, where a well-established methodology for quantifying risk exists. This paper discusses the extension of these methods to IOR project risk assessment. Combining reservoir and IOR technique uncertainties with their impact on project performance allows project risk to be better quantified. The results of the risk assessment are presented in terms of a risk-reward diagram that plots the probability surface for possible project outcomes as a function of NPV (reward) and exposure (risk)

  2. Understanding Pre-Quantitative Risk in Projects

    Science.gov (United States)

    Cooper, Lynne P.

    2011-01-01

    Standard approaches to risk management in projects depend on the ability of teams to identify risks and quantify the probabilities and consequences of these risks (e.g., the 5 x 5 risk matrix). However, long before quantification does - or even can - occur, and long after, teams make decisions based on their pre-quantitative understanding of risk. These decisions can have long-lasting impacts on the project. While significant research has looked at the process of how to quantify risk, our understanding of how teams conceive of and manage pre-quantitative risk is lacking. This paper introduces the concept of pre-quantitative risk and discusses the implications of addressing pre-quantitative risk in projects.

  3. Risk management for engineering projects procedures, methods and tools

    CERN Document Server

    Munier, Nolberto

    2014-01-01

    Many people see risk in engineering projects as an imprecise and nebulous problem - something that exists, is feared and is impossible to deal with. Nothing could be further from the truth. While risk is certainly ubiquitous, sometimes difficult to detect, and cannot always be completely avoided, it can generally be mitigated, reduced or prevented through timely analysis and action.   This book covers the entire process of risk management by providing methodologies for determining the sources of project risk, and once threats have been identified, managing them through:   ·         identification and assessment (probability, relative importance, variables, risk breakdown structure, etc.) ·         implementation of measures for their prevention, reduction or mitigation ·         evaluation of impacts and quantification of risks ·         establishment of control measures   It also considers sensitivity analysis to determine the influence of uncertain parameters values ...

  4. Risk management of PPP project in the preparation stage based on Fault Tree Analysis

    Science.gov (United States)

    Xing, Yuanzhi; Guan, Qiuling

    2017-03-01

    The risk management of PPP(Public Private Partnership) project can improve the level of risk control between government departments and private investors, so as to make more beneficial decisions, reduce investment losses and achieve mutual benefit as well. Therefore, this paper takes the PPP project preparation stage venture as the research object to identify and confirm four types of risks. At the same time, fault tree analysis(FTA) is used to evaluate the risk factors that belong to different parts, and quantify the influencing degree of risk impact on the basis of risk identification. In addition, it determines the importance order of risk factors by calculating unit structure importance on PPP project preparation stage. The result shows that accuracy of government decision-making, rationality of private investors funds allocation and instability of market returns are the main factors to generate the shared risk on the project.

  5. Risk Management of NASA Projects

    Science.gov (United States)

    Sarper, Hueseyin

    1997-01-01

    Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

  6. A mathematical model for crashing projects by considering time, cost, quality and risk

    Directory of Open Access Journals (Sweden)

    Amin Mahmoudi

    2017-01-01

    Full Text Available Employers are looking for reducing execution time and maintaining the quality of the projects that are the main objective of the projects. In this article, we focus on crashing projects by con-sidering different factors such as cost, time, quality and risk. For the proposed integer linear model, cost of conformance and cost of non-conformance are considered as parts of the costs of quality of deliverables in projects. The cost of conformance consists of the costs of training the project team, inspection and test of deliverables. The cost of non-conformance also includes costs of rework and scrap. Project risk management is one of the important aspects of the pro-jects. The present study also considers the impact of risks, which is highly applicable in projects with a high level of uncertainty. Results are presented using integer programming approach with the aim of minimizing the costs of the project.

  7. COORDINATES OF A RISK MANAGEMENT PROJECT

    Directory of Open Access Journals (Sweden)

    ALEXANDRU OLTEANU

    2013-05-01

    Full Text Available High risk – high benefit: a well-known correlation both in the economic field and in the day-to-day life. Another correlation, on which this article is based: large project – numerous participants – increased risks and other malfunctions. The risk management concept is challenged by those projects and is forced to find the most adequate “customized” ways for each project at its turn. In this respect, the assessment of management has followed the trend of the last three decades, marked by moving of management profit analysis by risk intermediation, respectively the transition from managing profit to risk-return relationship management. Such trend assumes the obligation of participants to identify objectives and expected benefits of the project on the basis of the strategies laid-down, the elements of risk management policies, in conjunction with the indication of the most negative scenarios which they may provide. This activity must take into consideration the process of obtaining and combining human, financial, physical and information resources in order to accomplish the primary goal of the proposed and wanted project by a certain segment of population. Project participants are directed to evaluate their own activities in terms of revenues and risks from the business access, opportunity, operating mode, as well as the limitations and boundaries on certain sides of activity. The paper focuses on the analysis and evaluation of incomes and risks, on simulations to streamline the activities and the determination of the optimal model of project choice. Also, the paper treats the risks that can be taken over by the sponsors, especially those related to implied guaranties, even implied guaranties.

  8. Development of funding project risk management tools.

    Science.gov (United States)

    2013-11-01

    Funding project risk management is a process for identifying, assessing, and prioritizing project funding risks. To plan to : minimize or eliminate the impact of negative events, one must identify what projects have higher risk to respond to potentia...

  9. Risk management methodology for RBMN project

    International Nuclear Information System (INIS)

    Borssatto, Maria F.B.; Tello, Cledola C.O.; Uemura, George

    2013-01-01

    RBMN Project has been developed to design, construct and commission a national repository to dispose the low- and intermediate-level radioactive wastes from the operation of nuclear power plants and other industries that use radioactive sources and materials. Risk is a characteristic of all projects. The risks arise from uncertainties due to assumptions associated with the project and the environment in which it is executed. Risk management is the method by which these uncertainties are systematically monitored to ensure that the objectives of the project will be achieved. Considering the peculiarities of the Project, that is, comprehensive scope, multidisciplinary team, apparently polemic due to the unknowing of the subject by the stake holders, especially the community, it is being developed a specific methodology for risk management of this Project. This methodology will be critical for future generations who will be responsible for the final stages of the repository. It will provide greater guarantee to the processes already implemented and will maintain a specific list of risks and solutions for this Project, ensuring safety and security of the repository throughout its life cycle that is the planned to last at least three hundred years. This paper presents the tools and processes already defined, management actions aimed at developing a culture of proactive risk in order to minimize threats to this Project and promote actions that bring opportunities to its success. The methodology is based on solid research on the subject, considering methodologies already established and globally recognized as best practices for project management. (author)

  10. Projective geometry for human motion, with an application to injury risk

    OpenAIRE

    Laurie, Henri; Penne, Rudi

    2004-01-01

    We give an exposition of Plucker vectors for a system of joint axes in projective 3-space. We use Plucker vectors to analyse dependencies among joint axes, and in particular show that two rotational joints rigidly joined by a bar and each with 3 degrees of freedom always forms a 5-dimensional system. We introduce the concept of reduced redundancy in a dependent set of projective Lines, and argue that reduced redundancy in the axes of a body position increases injury risk. We apply this to a s...

  11. Project risk as identity threat: explaining the development and consequences of risk discourse in an infrastructure project

    NARCIS (Netherlands)

    van Os, A.; van Berkel, F.J.F.W.; de Gilder, T.C.; van Dyck, C.; Groenewegen, P.

    2015-01-01

    This paper explores the role of social identity threat in risk discourse in an infrastructure project, and the consequences risk discourse has for cooperation between stakeholders. We show that risks posed a threat to the identity of the project team, resulting in a discourse focused on attributing

  12. Prototype Biology-Based Radiation Risk Module Project

    Science.gov (United States)

    Terrier, Douglas; Clayton, Ronald G.; Patel, Zarana; Hu, Shaowen; Huff, Janice

    2015-01-01

    Biological effects of space radiation and risk mitigation are strategic knowledge gaps for the Evolvable Mars Campaign. The current epidemiology-based NASA Space Cancer Risk (NSCR) model contains large uncertainties (HAT #6.5a) due to lack of information on the radiobiology of galactic cosmic rays (GCR) and lack of human data. The use of experimental models that most accurately replicate the response of human tissues is critical for precision in risk projections. Our proposed study will compare DNA damage, histological, and cell kinetic parameters after irradiation in normal 2D human cells versus 3D tissue models, and it will use a multi-scale computational model (CHASTE) to investigate various biological processes that may contribute to carcinogenesis, including radiation-induced cellular signaling pathways. This cross-disciplinary work, with biological validation of an evolvable mathematical computational model, will help reduce uncertainties within NSCR and aid risk mitigation for radiation-induced carcinogenesis.

  13. RISK MANAGEMENT APPROACHES AND PRACTICES IN IT PROJECTS

    Directory of Open Access Journals (Sweden)

    BRANDAS Claudiu

    2012-07-01

    Full Text Available Risk is identified in project management literature as an important factor influencing IT projects success, and it is relevant for both academic and practitionersn#8217; communities. The paper presents the past and current approaches to risk management in IT projects. The objective of this paper is to compare the different approaches and relate them to existing practices. Project management literature and practice have brought different approaches to risk management, and as a result, many projects ended in failure. We present how risk management is considered in the literature, and we compare the main two approaches: the evaluation approach and the management approach. The contingency approach does not consider risk management to be a specific process as it is an embedded process in the other project management processes. Then, we present the main practices in risk management. The methodology applied is based on documentary study review and analysis of the concepts used by the literature. We analyzed the literature published between 1978 and 2011 from the main journals for IT project management and found out that the essence of project management is risk management. The risk management practices have a considerable influence on stakeholdersn#8217; perception of project success. But, regardless of the chosen approach, a standard method for identifying, assessing, and responding to risks should be included in any project as this influences the outcome of the project.

  14. COORDINATES OF A RISK MANAGEMENT PROJECT

    OpenAIRE

    ALEXANDRU OLTEANU; MĂDĂLINA ANTOANETA RĂDOI

    2013-01-01

    High risk – high benefit: a well-known correlation both in the economic field and in the day-to-day life. Another correlation, on which this article is based: large project – numerous participants – increased risks and other malfunctions. The risk management concept is challenged by those projects and is forced to find the most adequate “customized” ways for each project at its turn. In this respect, the assessment of management has followed the trend of the last three decades, marked by movi...

  15. Subjective risk assessment for planning conservation projects

    International Nuclear Information System (INIS)

    Game, Edward T; Fitzsimons, James A; Lipsett-Moore, Geoff; McDonald-Madden, Eve

    2013-01-01

    Conservation projects occur under many types of uncertainty. Where this uncertainty can affect achievement of a project’s objectives, there is risk. Understanding risks to project success should influence a range of strategic and tactical decisions in conservation, and yet, formal risk assessment rarely features in the guidance or practice of conservation planning. We describe how subjective risk analysis tools can be framed to facilitate the rapid identification and assessment of risks to conservation projects, and how this information should influence conservation planning. Our approach is illustrated with an assessment of risks to conservation success as part of a conservation plan for the work of The Nature Conservancy in northern Australia. Risks can be both internal and external to a project, and occur across environmental, social, economic and political systems. Based on the relative importance of a risk and the level of certainty in its assessment we propose a series of appropriate, project level responses including research, monitoring, and active amelioration. Explicit identification, prioritization, and where possible, management of risks are important elements of using conservation resources in an informed and accountable manner. (letter)

  16. Assessing the impact of the heart of New Ulm Project on cardiovascular disease risk factors: A population-based program to reduce cardiovascular disease.

    Science.gov (United States)

    Sidebottom, Abbey C; Sillah, Arthur; Vock, David M; Miedema, Michael D; Pereira, Raquel; Benson, Gretchen; Lindberg, Rebecca; Boucher, Jackie L; Knickelbine, Thomas; VanWormer, Jeffrey J

    2018-04-07

    The Heart of New Ulm Project (HONU), is a population-based project designed to reduce modifiable cardiovascular disease (CVD) risk factors in the rural community of New Ulm, MN. HONU interventions address multiple levels of the social-ecological model. The community is served by one health system, enabling the use of electronic health record (EHR) data for surveillance. The purpose of this study was to assess if trends in CVD risk factors and healthcare utilization differed between a cohort of New Ulm residents age 40-79 and matched controls selected from a similar community, using EHR data from baseline (2008-2009) through three follow up time periods (2010-2011, 2012-2013, 2014-2015). Matching, using covariate balance sparse technique, yielded a sample of 4077 New Ulm residents and 4077 controls. We used mixed effects longitudinal models to examine trends over time between the two groups. Blood pressure, total cholesterol, low-density lipoprotein-cholesterol, and triglycerides showed better management in New Ulm over time compared to the controls. The proportion of residents in New Ulm with controlled blood pressure increased by 6.2 percentage points compared to an increase of 2 points in controls (p risk scores increased less in New Ulm (5.1) than the comparison community (5.9). The intervention and control community did not differ with regard to inpatient stays, smoking, or glucose. Findings suggest efficacy for the HONU project interventions for some outcomes. Copyright © 2017. Published by Elsevier Inc.

  17. Effects of Risk Management Practices on IT Project Success

    Directory of Open Access Journals (Sweden)

    Pimchangthong Daranee

    2017-03-01

    Full Text Available Successful management of an information technology (IT project is the most desirable for all organisations and stakeholders. Many researchers elaborated that risk management is a key part of project management for any project size. Risk management is so critical because it provides project managers with a forward-looking view of both threats and opportunities to improve the project success. The objectives of this research are to explore organisational factors affecting IT project success and risk management practices influencing IT project success. Risk management practices include risk identification, risk analysis, risk response planning, and risk monitoring and control. The IT project success is measured by process performance and product performance. Data are collected from 200 project managers, IT managers, and IT analysts in IT firms through questionnaires and analysed using Independent Sample t-test, One-way ANOVA, and Multiple Linear Regression at the statistical significance level of 0.05. The results show that the differences in organisational types affect IT project success in all aspects, while the differences on organisational sizes affect IT project success in the aspect of product performance and total aspects. Risk identification and risk response planning influence the process performance and the total aspects of IT project success. Risk identification has the highest positive influence on product performance, followed closely by risk response, while risk analysis negatively influences product performance.

  18. Assessments and applications to enhance human reliability and reduce risk during less-than-full-power operations

    International Nuclear Information System (INIS)

    Hannaman, G.W.; Singh, A.

    1992-01-01

    Study of events, interviews with plant personnel, and applications of risk studies indicate that the risk of a potential accident during less-than-full-power (LTFP) operation is becoming a greater fraction of the risk as improvements are made to the full-power operations. Industry efforts have been increased to reduce risk and the cost of shutdown operations. These efforts consider the development and application of advanced tools to help utilities proactively identify issues and develop contingencies and interventions to enhance reliability and reduce risk of low-power operations at nuclear power plants. The role for human reliability assessments is to help improve utility outage planning to better achieve schedule and risk control objectives. Improvements are expected to include intervention tools to identify and reduce human error, definition of new instructional modules, and prioritization of risk reduction issues for operators. The Electric Power Research Institute is sponsoring a project to address the identification and quantification of factors that affect human reliability during LTFP operation of nuclear power plants. The results of this project are expected to promote the development of proactively applied interventions and contingencies for enhanced human reliability during shutdown operations

  19. TECHNICAL RISK RATING OF DOE ENVIRONMENTAL PROJECTS - 9153

    International Nuclear Information System (INIS)

    Cercy, M.; Fayfich, Ronald; Schneider, Steven P.

    2008-01-01

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects

  20. Study on Risk Approaches in Software Development Projects

    Directory of Open Access Journals (Sweden)

    Claudiu BRANDAS

    2012-01-01

    Full Text Available Risk approaches in project development led to the integration in the IT project management methodologies and software development of activities and processes of risk management. The diversity and the advanced level of the used technologies in IT projects with increasing com-plexity leads to an exponential diversification of risk factors.The purpose of this research is to identify the level of the risk approach in IT projects both at the IT project management and software development methodologies level and the level of the perception of IT project man-agers, IT managers and IT analysts in Romanian IT companies. Thus, we want to determine the correlation between the use of a project management or software development methodology and the overall level of risk perceived by the project managers using these methodologies.

  1. Streamlining project delivery through risk analysis.

    Science.gov (United States)

    2015-08-01

    Project delivery is a significant area of concern and is subject to several risks throughout Plan Development : Process (PDP). These risks are attributed to major areas of project development, such as environmental : analysis, right-of-way (ROW) acqu...

  2. Risk management in product innovation projects

    NARCIS (Netherlands)

    Halman, J.I.M.; Keizer, J.A.

    1993-01-01

    In product innovation projects risk management has become increasingly important. Technological and commercial developments ask for effective and efficient product innovation. Systematic diagnosing and management of risks can help to make product innovation projects successful. In this paper a

  3. Risk Management in Information Technology Project: An Empirical Study

    Directory of Open Access Journals (Sweden)

    Kornelius Irfandhi

    2016-09-01

    Full Text Available The companies are facing some risks due to changes in a dynamic environment. If risks are not managed properly, it will have some negative impacts on the companies at the present and the future. One important function of the Information Technology (IT governance is risk management. Risk management in IT project aims to provide a safe environment for IT projects undertaken. Risk management becomes an important process for the success of IT projects. This article discussed the risk of IT project and whether there was a relationship between risk management and the success of the project. The method used was performing a literature review of several scientific articles which published between 2010 and 2014. The results of this study are the presence of risk management and risk manager influence the success of the project. Risk analysis and risk monitoring and control also have a relationship with the subjective performance of IT projects. If risk management is applied properly, the chance of the success of the projects undertaken can be increased. 

  4. Diagnosing risks in product-innovation projects

    NARCIS (Netherlands)

    Halman, Johannes I.M.; Keizer, J.A.

    A new method of diagnosing risks in product-innovation projects is introduced in the paper. The method is an improvement on existing risk methods used on product-innovation projects, such as potential problem analysis and failure mode and effects analysis. Technological, organizational and

  5. Diagnosing risks in product-innovation projects

    NARCIS (Netherlands)

    Halman, J.I.M.; Keizer, J.A.

    1994-01-01

    A new method of diagnosing risks in product-innovation projects is introduced in the paper. The method is an improvement on existing risk methods used on product-innovation projects, such as potential problem analysis and failure mode and effects analysis. Technological, organizational and

  6. Default risk in project finance

    NARCIS (Netherlands)

    Klompjan, R.; Wouters, Marc

    2002-01-01

    Understanding default risk in project finance is relevant to investors. This article investigates which factors are most strongly associated with the occurrence of project finance default, using data from 210 projects, of which 37 were in default. The authors found that the use of proven technology,

  7. Consideration of Risk in PPP-Projects

    Directory of Open Access Journals (Sweden)

    Josef Zimmermann

    2014-06-01

    Full Text Available Risk management has become a core competence for companies operating in construction services. In particular regarding Real Estate Development and Construction Management the fundamental knowledge and the dedicated ap- plication of risk assessment turn out to be critical. Construction Management deals with a multitude of local and temporal issues which are unknown or only given by statistical evaluation while conducting a unique construction project within a very tight frame of budget and time. Real Estate projects focus on the predictability of profitable operation for a fairly long period in advance and are therefore subject to many more and more voluminous uncertainties. With PPP-projects a more or less complete federal task is awarded to a private company. Its extent varies but com- prises at least design, construction and operation of a real estate project, e.g. a toll road, bridge, tunnel or other infrastructural object. Durations of such contracts of- ten extend to some 20 to 30 years. In this article the applicability of traditional means of risk management is inves- tigated for the use on PPP-projects and limits of risk consequences are pointed out. Finally we come to the conclusion, that the resulting unavertable risks tend to exceed every surcharge that could be successfully placed on a market.

  8. Damage-reducing measures to manage flood risks in a changing climate

    Science.gov (United States)

    Kreibich, Heidi; Bubeck, Philip; Van Vliet, Mathijs; De Moel, Hans

    2014-05-01

    Damage due to floods has increased during the last few decades, and further increases are expected in several regions due to climate change and a growing vulnerability. To address the projected increase in flood risk, a combination of structural and non-structural flood risk mitigation measures is considered as a promising adaptation strategy. Such a combination takes into account that flood defence systems may fail, and prepare for unexpected crisis situations via land-use planning, building construction, evacuation and disaster response. Non-structural flood risk mitigation measures like shielding with water shutters or sand bags, building fortification or safeguarding of hazardous substances are often voluntary: they demand self-dependent action by the population at risk (Bubeck et al. 2012; 2013). It is believed that these measures are especially effective in areas with frequent flood events and low flood water levels, but some types of measures showed a significant damage-reducing effect also during extreme flood events, such as the Elbe River flood in August 2002 in Germany (Kreibich et al. 2005; 2011). Despite the growing importance of damage-reducing measures, information is still scarce about factors that motivate people to undertake such measures, the state of implementation of various non-structural measures in different countries and their damage reducing effects. Thus, we collected information and undertook an international review about this topic in the framework of the Dutch KfC project "Climate proof flood risk management". The contribution will present an overview about the available information on damage-reducing measures and draw conclusions for practical flood risk management in a changing climate. References: Bubeck, P., Botzen, W. J. W., Suu, L. T. T., Aerts, J. C. J. H. (2012): Do flood risk perceptions provide useful insights for flood risk management? Findings from central Vietnam. Journal of Flood Risk Management, 5, 4, 295-302 Bubeck, P

  9. Risk management for independent power projects

    International Nuclear Information System (INIS)

    Owen, J.L.

    1993-01-01

    Independent Power, where electric utilities or other bulk electric power users contract with individual electric power generation facilities to meet their projected long term power needs, has grown dramatically over the past ten years or more. This concept, to contract with Independent Power Producers (IPP), is not a new concept and in fact goes back to the early formation of the electric power industry in this country and worldwide. Successful Risk Management is the foundation for ultimate project completion and operation in fulfilling the expectations of all parties. The primary risks associated with the development of Independent Power projects include: predicting long term fuel availability and cost; predicting long term price for the deliverable of electricity; site selection, site characteristics and permitting; innovative or evolving technology; project execution (design and construction), and; lifetime O ampersand M costs and plant reliability. This paper focuses on the risks inherent in the development of IPPs and addresses the management of these risks

  10. Risk Factors in ERP Implementation Projects for Process Oriented

    Directory of Open Access Journals (Sweden)

    Andrzej Partyka

    2009-09-01

    Full Text Available This paper present review and analysis of risk factors, which could affect successful implementation of ERP system, for project performed in project oriented organizations. Presented risk breakdown structure and the list of common risk factors, are well-suited for ERP implementation projects. Considered risk categories allow for complex risk analysis. Additionally, mapping of risk importance for particular implementation phases is presented. Making presented model an important input for project risk management process, especially for the beginning phases which require identification of risk factors.

  11. Risk managements' communicative effects influencing IT project success

    NARCIS (Netherlands)

    de Bakker, Karel; Boonstra, Albert; Wortmann, Hans

    The central question of this research is if, and how, risk management contributes to the success of IS/IT projects. Risk management is used regularly in IT projects, despite indications in literature that risk management only occasionally contributes to IT project success. Drawing on Habermas we

  12. Dealing with project complexity by matrix-based propagation modelling for project risk analysis

    OpenAIRE

    Fang , Chao; Marle , Franck

    2012-01-01

    International audience; Engineering projects are facing a growing complexity and are thus exposed to numerous and interdependent risks. In this paper, we present a quantitative method for modelling propagation behaviour in the project risk network. The construction of the network requires the involvement of the project manager and related experts using the Design Structure Matrix (DSM) method. A matrix-based risk propagation model is introduced to calculate risk propagation and thus to re-eva...

  13. Managing geotechnical risk on US design-build transport projects

    Directory of Open Access Journals (Sweden)

    Kevin McLain

    2014-03-01

    Full Text Available Awarding design-build (DB contracts before a complete subsurface investigation is completed, makes mitigating the risk of differing site conditions difficult, if not impossible. The purpose of the study was to identify effective practices for managing geotechnical risk in DB projects, and it reports the results of a survey that included responses from 42 of 50 US state departments of transportation and a content analysis of DB requests for proposals from 26 states to gauge the client’s perspective, as well as 11 structured interviews with DB contractors to obtain the perspective from the other side of the DB contract.  A suite of DB geotechnical risk manage tools is presented based on the results of the analysis. Effective practices were found in three areas: enhancing communications on geotechnical issues before final proposals are submitted; the use of project-specific differing site conditions clauses; and expediting geotechnical design reviews after award. The major finding is that contract verbiage alone is not sufficient to transfer the risk of changed site conditions. The agency must actively communicate all the geotechnical information on hand at the time of the DB procurement and develop a contract strategy that reduces/retires the risk of geotechnical uncertainty as expeditiously as possible after award.

  14. Educational project on risk communication and reduction of the radon exposure in buildings

    International Nuclear Information System (INIS)

    Conrady, J.; Guhr, A.; Uhlig, R.

    2009-01-01

    The radon exposure in buildings is supposed to be the most important risk factor of lung cancer. In Saxony about 800 000 persons live in apartments with high radon exposure. The study discusses the effects of an educational project to communicate the facts on radon exposure in buildings and to develop risk awareness and individual initiatives to reduce the radon concentration. The project includes support and encouragement with respect of preventive and protective measures to improve the individual situation. Further items cover requirements for control and quantification of intervention impacts, development and optimization of specific strategies for a permanent risk communication in schools. Results of the pilot study are summarized.

  15. Project finance risks - getting it right first time

    International Nuclear Information System (INIS)

    Bain, F.

    1996-01-01

    Bankers seeking to invest in the construction of new power stations by independent power producers, face greater risks than those lending to companies. Independent risk and insurance advisers are used to assess project risk. ''Project finance'' has become increasingly popular as it allows projects to go ahead that could not be supported from sponsors' own resources. In addition, project finance means that various equity partners can join together in a joint venture company and limit their individual risk. Project finance can be delayed by differences between the needs of sponsors, financiers and insurers. The process can be speeded up by foreknowledge of bankers' requirements. (UK)

  16. Analysis of interactions among barriers in project risk management

    Science.gov (United States)

    Dandage, Rahul V.; Mantha, Shankar S.; Rane, Santosh B.; Bhoola, Vanita

    2018-03-01

    In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk management, the manifestation of barriers to project risk management is a less dwelt topic. The success of project management is oftentimes based on the understanding of barriers to effective risk management, application of appropriate risk management methodology, proactive leadership to avoid barriers, workers' attitude, adequate resources, organizational culture, and involvement of top management. This paper represents various risk categories and barriers to risk management in domestic and international projects through literature survey and feedback from project professionals. After analysing the various modelling methods used in project risk management literature, interpretive structural modelling (ISM) and MICMAC analysis have been used to analyse interactions among the barriers and prioritize them. The analysis indicates that lack of top management support, lack of formal training, and lack of addressing cultural differences are the high priority barriers, among many others.

  17. What is project finance?

    OpenAIRE

    João M. Pinto

    2017-01-01

    Project finance is the process of financing a specific economic unit that the sponsors create, in which creditors share much of the venture’s business risk and funding is obtained strictly for the project itself. Project finance creates value by reducing the costs of funding, maintaining the sponsors financial flexibility, increasing the leverage ratios, avoiding contamination risk, reducing corporate taxes, improving risk management, and reducing the costs associated with market ...

  18. Reducing the Risks of Teenage Pregnancy.

    Science.gov (United States)

    Mitchell, M. Faith

    1984-01-01

    Reviews the medical and social risks of teenage pregnancy and describes two successful programs dealing with pregnancy and parenting: the St. Paul Maternal and Infant Care Project in Minnesota and the Teenage Pregnancy and Parenting Project in San Francisco. (SK)

  19. Financing offshore projects: The banker's approach to risk

    International Nuclear Information System (INIS)

    Beldam, R.A.

    1994-01-01

    The author has attempted to consider why companies chose to share risks with banks and looked in particular at the unique risk sharing aspect of project financing and how this may be reflected in the loan documentation. He also has considered the current market place and examined some trends for the future. The future challenge in the North Sea is going to be to use existing and new technology to reduce capital and operating costs, balanced with optimal recovery and safety. From a bank perspective, this type of work is extremely satisfying, if challenging, and the author has no doubt banks will continue to play their part in the future of offshore development wherever it occurs around the world

  20. Implementation of lean construction techniques for minimizing the risks effect on project construction time

    Directory of Open Access Journals (Sweden)

    Usama Hamed Issa

    2013-12-01

    Full Text Available The construction projects involve various risk factors which have various impacts on time objective that may lead to time-overrun. This study suggests and applies a new technique for minimizing risk factors effect on time using lean construction principles. The lean construction is implemented in this study using the last planner system through execution of an industrial project in Egypt. Evaluating the effect of using the new tool is described in terms of two measurements: Percent Expected Time-overrun (PET and Percent Plan Completed (PPC. The most important risk factors are identified and assessed, while PET is quantified at the project start and during the project execution using a model for time-overrun quantification. The results showed that total project time is reduced by 15.57% due to decreasing PET values, while PPC values improved. This is due to minimizing and mitigating the effect of most of the risk factors in this project due to implementing lean construction techniques. The results proved that the quantification model is suitable for evaluating the effect of using lean construction techniques. In addition, the results showed that average value of PET due to factors affected by lean techniques represents 67% from PET values due to all minimized risk factors.

  1. Review of the project risk management plan in the capital projects organization at ConocoPhillips

    OpenAIRE

    Meidell, Camilla

    2011-01-01

    Master's thesis in Risk management Project Risk Management (PRM) has in recent years become an important aspect of business organization and project management. There has always been a requirement for some risk management at COPNO. However about 3 years ago the process became much more defined and has become a requirement for the contingency used on projects to be based upon the risking process. Since risk management in projects is a requirement in the CP organization it is ...

  2. The study of the risk management model of construction project

    International Nuclear Information System (INIS)

    Jiang Bo; Feng Yanping; Liu Changbin

    2010-01-01

    The paper first analyzed the development of the risk management of construction project and the risk management processes, and then briefly introduced the risk management experience of foreign project management. From the project management by objectives point of view, the greatest risk came from the lack of clarity of the objectives in the project management, which led to the project's risk emergence. In the analysis of the principles of the project objectives identification and risk allocation, the paper set up a project management model which insurance companies involved in the whole process of the project management, and simply analyzed the roles of insurance company at last. (authors)

  3. The KnowRISK project: Tools and strategies for risk communication and learning

    Science.gov (United States)

    Musacchio, Gemma; Amaral Ferreira, Mónica; Falsaperla, Susanna; Piangiamore, Giovanna Lucia; Pino, Nicola Alessandro; Solarino, Stefano; Crescimbene, Massimo; Eva, Elena; Reitano, Danilo; Þorvaldsdottir, Solveig; Sousa Silva, Delta; Rupakhety, Rajesh; Sousa Oliveira, Carlos

    2016-04-01

    Damage of non-structural elements of buildings (i.e. partitions, ceilings, cladding, electrical and mechanical systems and furniture) is known to cause injuries and human losses. Also it has a significant impact on earthquake resilience and is yet being worldwide underestimated. The project KnowRISK (Know your city, Reduce seISmic risK through non-structural elements) is financed by the European Commission to develop prevention measures that may reduce non-structural damage in urban areas. Pilot areas of the project are within the three European participating countries, namely Portugal, Iceland and Italy. They were chosen because they are prone to damage level 2 and 3 (EMS-98, European Macroseismic Scale) that typically affects non-structural elements. We will develop and test a risk communication strategy taking into account the needs of households and schools, putting into practice a portfolio of best practice to reduce the most common non-structural vulnerabilities. We will target our actions to different societal groups, considering their cultural background and social vulnerabilities, and implement a participatory approach that will promote engagement and interaction between the scientific community, practitioners and citizens to foster knowledge on everyone's own neighborhoods, resilience and vulnerability. A Practical Guide for citizens will highlight that low-cost actions can be implemented to increase safety of households, meant as being the places where the most vulnerable societal groups, including children and elderly people, spend much of their time. Since our actions towards communication will include education, we will define tools that allow a clear and direct understanding of elements exposed to risk. Schools will be one of our target societal groups and their central role played at the community level will ensure spreading and strengthening of the communication process. Schools are often located in old or re-adapted buildings, formerly used for

  4. On Best Practices for Risk Management in Complex Projects

    Directory of Open Access Journals (Sweden)

    Dan BENTA

    2011-01-01

    Full Text Available Risk management shall be proactive. This is one of the key preliminaries to cope with the challenges of complex projects. An overarching and consistent view on project risks and uncertainties is necessary to follow a holistic approach in project risk management. Uncertainty is inevitable since projects are unique and temporary undertakings based on assumptions and constraints, delivering project results to multiple stakeholders with different requirements. Project management can be seen as an attempt to control this uncertain environment, through the use of structured and disciplined techniques such as estimating, planning, cost control, task allocation, earned value analysis, monitoring, and review meetings. Each of these elements of project management has a role in defining or controlling inherent variability in projects. Project risk management provides approaches by which uncertainty can be understood, assessed, and managed within projects. A number of associations (e.g., Project Management Institute – PMI®, International Project Management Association – IPMA,or Network of Nordic Project Management Associations - NORDNET work constantly in acquiring, improving, and standardizing best practices in project management.Based on the industrial practice, this paper outlines strategies to identify, prioritize, and mitigate risks for achievement of project’ or organizational objectives.

  5. RISK MANAGEMENT USING PROJECT RECON

    Science.gov (United States)

    2016-11-28

    centralized database . • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any...Create growth plans to proactively capture benefits • Customize reports to group opportunities by programmatic, technical, business, contracting, and

  6. Reducing the risk of nuclear terrorism

    International Nuclear Information System (INIS)

    Hibbs, R.

    2005-01-01

    Full text: The March 2005 'International conference on nuclear security, global directions for the future' noted that nuclear terrorism is one of the greatest threats to society. Eminent members of a multi-national panel stated that there is no one principal activity to reduce the risk of nuclear terrorism and that a combination of activities is required. This paper seeks to identify those activities by analyzing the elements that comprise the risk of nuclear terrorism. For the purpose of the analysis, risk is the product of the probability of a terrorist attack (A p ), the success of a terrorist act (S p ) and the consequence (C) of the attack: R=A p * S p * C. The paper examines each of these three elements of risk with the objective of identifying what we are doing and what else we could be doing to reduce risk. It takes into consideration some historic catastrophes, examines how they might have been prevented or their consequences reduced, and if there are lessons that are applicable to reducing the risk of nuclear terrorism. The paper demonstrates that we have concentrated on only one of the three elements of risk and offer suggestions for diminishing the risk of nuclear terrorism by addressing all the elements. (author)

  7. Risk Management on the National Compact Stellarator Project (NCSX)

    International Nuclear Information System (INIS)

    Simmons, Robert T.; Heitzenroeder, Philip J.; Reiersen, Wayne T.; Neilson, George H.; Strykowsky, Ronald L.; Rej, Donald; Gruber, Christopher O.

    2009-01-01

    In its simplest form, risk management is a continuous assessment from project start to completion that identifies what can impact your project (i.e., what the risks are)., which of these risks are important, and identification and implementation of strategies to deal with these risks (both threats and opportunities). The National Compact Stellerator Experiment (NCSX) Project was a 'first-of-a-kind' fusion experiment that was technically very challenging, primarily resulting from the complex component geometries and tight tolerances. Initial risk quantification approaches proved inadequate and contributed to the escalation of costs as the design evolved and construction started. After the Project was well into construction, a new risk management plan was adopted. This plan was based on successful Department of Energy (DOE) and industrial risk management precepts. This paper will address the importance of effective risk management processes and lessons learned. It is of note that a steady reduction of risk was observed in the last six months of the project

  8. Managing project risks and uncertainties

    Directory of Open Access Journals (Sweden)

    Mike Mentis

    2015-01-01

    Full Text Available This article considers threats to a project slipping on budget, schedule and fit-for-purpose. Threat is used here as the collective for risks (quantifiable bad things that can happen and uncertainties (poorly or not quantifiable bad possible events. Based on experience with projects in developing countries this review considers that (a project slippage is due to uncertainties rather than risks, (b while eventuation of some bad things is beyond control, managed execution and oversight are still the primary means to keeping within budget, on time and fit-for-purpose, (c improving project delivery is less about bigger and more complex and more about coordinated focus, effectiveness and developing thought-out heuristics, and (d projects take longer and cost more partly because threat identification is inaccurate, the scope of identified threats is too narrow, and the threat assessment product is not integrated into overall project decision-making and execution. Almost by definition, what is poorly known is likely to cause problems. Yet it is not just the unquantifiability and intangibility of uncertainties causing project slippage, but that they are insufficiently taken into account in project planning and execution that cause budget and time overruns. Improving project performance requires purpose-driven and managed deployment of scarce seasoned professionals. This can be aided with independent oversight by deeply experienced panelists who contribute technical insights and can potentially show that diligence is seen to be done.

  9. PECULIARITIES OF ASSESSMENT AND RISK MANAGEMENT IN INNOVATIVE PROJECTS

    Directory of Open Access Journals (Sweden)

    Victor V. Guzhov

    2014-01-01

    Full Text Available The methodological and methodicalbases of risk management in innovativeprojects. Classification of risks. Types of risks depending on the stage of realizationof the innovative project. Investigated thefactors contributing to the emergence ofrisk situations. The basic techniques of risk management of innovation projects.Proposed criteria for the choice of the innovative project to implement in the realsector of the economy.

  10. Network theory-based analysis of risk interactions in large engineering projects

    International Nuclear Information System (INIS)

    Fang, Chao; Marle, Franck; Zio, Enrico; Bocquet, Jean-Claude

    2012-01-01

    This paper presents an approach based on network theory to deal with risk interactions in large engineering projects. Indeed, such projects are exposed to numerous and interdependent risks of various nature, which makes their management more difficult. In this paper, a topological analysis based on network theory is presented, which aims at identifying key elements in the structure of interrelated risks potentially affecting a large engineering project. This analysis serves as a powerful complement to classical project risk analysis. Its originality lies in the application of some network theory indicators to the project risk management field. The construction of the risk network requires the involvement of the project manager and other team members assigned to the risk management process. Its interpretation improves their understanding of risks and their potential interactions. The outcomes of the analysis provide a support for decision-making regarding project risk management. An example of application to a real large engineering project is presented. The conclusion is that some new insights can be found about risks, about their interactions and about the global potential behavior of the project. - Highlights: ► The method addresses the modeling of complexity in project risk analysis. ► Network theory indicators enable other risks than classical criticality analysis to be highlighted. ► This topological analysis improves project manager's understanding of risks and risk interactions. ► This helps project manager to make decisions considering the position in the risk network. ► An application to a real tramway implementation project in a city is provided.

  11. Steam Pressure-Reducing Station Safety and Energy Efficiency Improvement Project

    Energy Technology Data Exchange (ETDEWEB)

    Lower, Mark D [ORNL; Christopher, Timothy W [ORNL; Oland, C Barry [ORNL

    2011-06-01

    reduce its overall utility costs by decreasing the amount of fuel used to generate steam. Reduced fuel consumption also decreased air emissions. These improvements also helped lower the risk of burn injuries to workers and helped prevent shrapnel injuries resulting from missiles produced by pressurized component failures. In most cases, the economic benefit and cost effectiveness of the SPRS Safety and Energy Efficiency Improvement Project is reflected in payback periods of 1 year or less.

  12. The Risks of Investments in Transport Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    O. Pokorná

    2002-01-01

    Full Text Available Investment decisions should not be taken without an in-depth analysis of the risks. This is an important stage in project preparation and should be performed simultaneously with the planning of the financial operations. Infrastructure development requires that project risks and responsibilities be assigned to the public or private entity that is best able to manage them. The risks and their financial impacts are usually not quantified equally by all parties. Each party views the given risks according to the guarantees provided. These guarantees are related to the form of participation in the project.

  13. Security Risk Assessment in Software Development Projects

    OpenAIRE

    Svendsen, Heidi

    2017-01-01

    Software security is increasing in importance, linearly with vulnerabilities caused by software flaws. It is not possible to spend all the project s resources on software security. To spend the resources given to security in an effective way, one should know what is most important to protect. By performing a risk analysis the project know which vulnerabilities they face. A risk analysis will prioritise the vulnerabilities, and when the vulnerabilities are prioritised the project know where th...

  14. Simple steps help minimize costs, risks in project contracts

    International Nuclear Information System (INIS)

    Camps, J.A.

    1996-01-01

    Contrary to prevailing opinion, risks and project financing costs can be higher for lump sum (LS) project contracts than under reimbursable-type contracts. An element-by-element analysis of the risks and costs associated with a project enables investors to develop variations of reimbursable contracts. Project managers can use this three-step procedure, along with other recommendations, to measure the hidden project costs and risks associated with LS contracts. The author bases his conclusions on case studies of recent projects in the petroleum refining and petrochemical industries. The findings, however, are general enough to be applicable in other industrial sectors

  15. An Assessment of risk response strategies practiced in software projects

    Directory of Open Access Journals (Sweden)

    Vanita Bhoola

    2014-11-01

    Full Text Available Risk management and success in projects are highly intertwined – better approaches to project risk management tend to increase chances of project success in terms of achieving scope & quality, schedule and cost targets. The process of responding to risk factors during a project’s life cycle is a crucial aspect of risk management referred to as risk response strategies, in this paper. The current research explores the status of risk response strategies applied in the software development projects in India. India provides a young IT-savvy English-speaking population, which is also cost effective. Other than the workforce, the environment for implementation of software projects in India is different from the matured economies. Risk management process is a commonly discussed theme, though its implementation in practice has a huge scope for improvement in India. The paper talks about four fundamental treatments to risk response – Avoidance, Transference, Mitigation and Acceptance (ATMA. From a primary data of 302 project managers, the paper attempts to address the risk response factors that lead to successful achievement of project scope & quality, schedule and cost targets, by using a series of regressions followed with Seemingly Unrelated Regression Equations (SURE modelling. Mitigation emerged as the most significant risk response strategy to achieve project targets. Acceptance, transference, and avoidance of risk were mostly manifested in the forms of transparency in communication across stakeholders, careful study of the nature of risks and close coordination between project team, customers/end-users and top management.

  16. Sound transit climate risk reduction project.

    Science.gov (United States)

    2013-09-01

    The Climate Risk Reduction Project assessed how climate change may affect Sound Transit commuter rail, light rail, and express bus : services. The project identified potential climate change impacts on agency operations, assets, and long-term plannin...

  17. Applied software risk management a guide for software project managers

    CERN Document Server

    Pandian, C Ravindranath

    2006-01-01

    Few software projects are completed on time, on budget, and to their original specifications. Focusing on what practitioners need to know about risk in the pursuit of delivering software projects, Applied Software Risk Management: A Guide for Software Project Managers covers key components of the risk management process and the software development process, as well as best practices for software risk identification, risk planning, and risk analysis. Written in a clear and concise manner, this resource presents concepts and practical insight into managing risk. It first covers risk-driven project management, risk management processes, risk attributes, risk identification, and risk analysis. The book continues by examining responses to risk, the tracking and modeling of risks, intelligence gathering, and integrated risk management. It concludes with details on drafting and implementing procedures. A diary of a risk manager provides insight in implementing risk management processes.Bringing together concepts ...

  18. Newly developed integrated model to reduce risks in the electricity market

    International Nuclear Information System (INIS)

    Mo, Birger

    2001-01-01

    A new model which integrates hydro-scheduling and financial hedging has been developed in cooperation with Norsk Hydro. We believe the new tool will be useful for owners of hydropower plants that want to reduce risks in the power market. The model development started in 1997 and was financed by Norsk Hydro. As of 1998, the main financial contributor has been the Research Council of Norway through a project in the Strategic Institute Programme. (author)

  19. Project Structuring and Risk Allocation for NPP Construction

    International Nuclear Information System (INIS)

    Kaser, Greg

    2013-01-01

    This presentation treats of the project risks and how to mitigate major risks and structure a new project. It also talks about the contract implications to handle the specificities of a new project: design complexities, interface between the engineering, procurement and constructing contractors, and finally discusses the necessity of a stable regulatory environment and the role of government

  20. Risks and chances of combined forestry and biomass projects under the Clean Development Mechanism

    Energy Technology Data Exchange (ETDEWEB)

    Dutschke, Michael; Kapp, Gerald; Lehmann, Anna; Schaefer, Volkmar (Hamburg Inst. International Economics (Germany))

    2006-06-15

    The Clean Development Mechanism (CDM) aims at reducing greenhouse gas (GHG) emissions, while at the same time taking up CO{sub 2} from the atmosphere in vegetation by means of afforestation and reforestation. In spite of these options being complementary, rules and modalities for both project classes are being treated separately in the relevant decisions by the Conference of the Parties to the UN Framework Convention on Climate Change. The present study reviews the state of bioenergy use in developing countries, modalities and procedures under the CDM, and the potential for transaction cost reduction in climate mitigation projects. There are four potential types of combinations in the matrix between small-scale - large-scale / afforestation and reforestation - bioenergy activities. We develop criteria for assessing sustainable development benefits and present an example project for each of the potential project types. We find that the individual risks of single-category projects do not increase when combining project categories and that each combination holds potential for integrated sustainability benefits. Risks for local livelihoods do increase with project size, but a transparent, participatory planning phase is able to counterbalance smallholders' lack of negotiation power. Further research will have to develop concrete project examples and blueprints with approved CDM methodologies, thereby decreasing transaction costs and risk for all potential project partners. (au)

  1. Modeling Research Project Risks with Fuzzy Maps

    Science.gov (United States)

    Bodea, Constanta Nicoleta; Dascalu, Mariana Iuliana

    2009-01-01

    The authors propose a risks evaluation model for research projects. The model is based on fuzzy inference. The knowledge base for fuzzy process is built with a causal and cognitive map of risks. The map was especially developed for research projects, taken into account their typical lifecycle. The model was applied to an e-testing research…

  2. Method ranks competing projects by priorities, risk

    International Nuclear Information System (INIS)

    Moeckel, D.R.

    1993-01-01

    A practical, objective guide for ranking projects based on risk-based priorities has been developed by Sun Pipe Line Co. The deliberately simple system guides decisions on how to allocate scarce company resources because all managers employ the same criteria in weighing potential risks to the company versus benefits. Managers at all levels are continuously having to comply with an ever growing amount of legislative and regulatory requirements while at the same time trying to run their businesses effectively. The system primarily is designed for use as a compliance oversight and tracking process to document, categorize, and follow-up on work concerning various issues or projects. That is, the system consists of an electronic database which is updated periodically, and is used by various levels of management to monitor progress of health, safety, environmental and compliance-related projects. Criteria used in determining a risk factor and assigning a priority also have been adapted and found useful for evaluating other types of projects. The process enables management to better define potential risks and/or loss of benefits that are being accepted when a project is rejected from an immediate work plan or budget. In times of financial austerity, it is extremely important that the right decisions are made at the right time

  3. Risk Management in Construction Project: Taking Fairness into Account

    Science.gov (United States)

    Górecki, Jarosław; Bizon-Górecka, Jadwiga

    2017-10-01

    Risk management requires a comprehensive review of possible hazards, their possible outcomes as well as some recommendations about minimizing the risk. The study emphasises that the project risk management refers to an analysis of the risk factors and a creation of the strategy minimising negative effects of the risk. It was pointed out that a construction project is this kind of projects that can be defined as a unique process of high complexity (design documentation, various stages of creating the building), which has clearly defined time frames and a given financial limit. It is executed as a team work, by qualified or highly qualified specialists of different matters, for example masonry, precast, etc. Additionally, it requires a use of modern equipment and an adequate preparation of the investment. Therefore, the risk management focuses on the problems allowing for troubleshooting. A basis of the risk management is to recognise the fundamentals, which are crucial for the construction project management, i.e. an object perspective, including technological, supporting and management processes as well as an entity perspective - project stakeholders. Construction projects require also an acquaintance with the specificity of the branch. The article refers to the risk management in construction project and, in particular, a phenomenon of participants’ fairness in such projects. The problem of fairness of the entities involved in a project should be understood as a fair play, according to the arrangements agreed in a contract and compatible with current formal procedures and social rules. It was indicated that fairness can be treated as an important factor in predicting the success of such projects. Interviews conducted among contractors in Kuyavian-Pomeranian region showed varied fairness requirements put to individual participants of construction projects. The article presents results of the research. It shows a desired attitude of the surveyed enterprises

  4. Managing risks in the project pipeline.

    Science.gov (United States)

    2013-08-01

    This research focuses on how to manage the risks of project costs and revenue uncertainties over the long-term, and identifies significant : process improvements to ensure projects are delivered on time and as intended, thus maximizing the miles pave...

  5. Accident Precursor Analysis and Management: Reducing Technological Risk Through Diligence

    Science.gov (United States)

    Phimister, James R. (Editor); Bier, Vicki M. (Editor); Kunreuther, Howard C. (Editor)

    2004-01-01

    Almost every year there is at least one technological disaster that highlights the challenge of managing technological risk. On February 1, 2003, the space shuttle Columbia and her crew were lost during reentry into the atmosphere. In the summer of 2003, there was a blackout that left millions of people in the northeast United States without electricity. Forensic analyses, congressional hearings, investigations by scientific boards and panels, and journalistic and academic research have yielded a wealth of information about the events that led up to each disaster, and questions have arisen. Why were the events that led to the accident not recognized as harbingers? Why were risk-reducing steps not taken? This line of questioning is based on the assumption that signals before an accident can and should be recognized. To examine the validity of this assumption, the National Academy of Engineering (NAE) undertook the Accident Precursors Project in February 2003. The project was overseen by a committee of experts from the safety and risk-sciences communities. Rather than examining a single accident or incident, the committee decided to investigate how different organizations anticipate and assess the likelihood of accidents from accident precursors. The project culminated in a workshop held in Washington, D.C., in July 2003. This report includes the papers presented at the workshop, as well as findings and recommendations based on the workshop results and committee discussions. The papers describe precursor strategies in aviation, the chemical industry, health care, nuclear power and security operations. In addition to current practices, they also address some areas for future research.

  6. Risk Reducing Effect of AIS Implementation on Collision Risk

    DEFF Research Database (Denmark)

    Lützen, Marie; Friis-Hansen, Peter

    2003-01-01

    AIS (Automatic Identification System) is a transponder system developed for sea traffic purposes. The system sends and receives important ship information and other safety-related information between other ships and shore-based AIS stations. The implementation of AIS has now been initiated and......, as a result, the community will undoubtedly observe an increase in navigational safety. However, to the authors? knowledge, no study has so far rigorously quantified the risk reducing effect of using AIS as an integrated part of the navigational system. The objective of this study is to fill this gap....... The risk reducing effect of AIS is quantified by building a Bayesian network facilitating an evaluation of the effect of AIS on the navigational officer?s reaction ability in a potential, critical collision situation. The time-dependent change in the risk reducing effect on ship collisions is analysed...

  7. Rapid Response Risk Assessment in New Project Development

    Science.gov (United States)

    Graber, Robert R.

    2010-01-01

    A capability for rapidly performing quantitative risk assessments has been developed by JSC Safety and Mission Assurance for use on project design trade studies early in the project life cycle, i.e., concept development through preliminary design phases. A risk assessment tool set has been developed consisting of interactive and integrated software modules that allow a user/project designer to assess the impact of alternative design or programmatic options on the probability of mission success or other risk metrics. The risk and design trade space includes interactive options for selecting parameters and/or metrics for numerous design characteristics including component reliability characteristics, functional redundancy levels, item or system technology readiness levels, and mission event characteristics. This capability is intended for use on any project or system development with a defined mission, and an example project will used for demonstration and descriptive purposes, e.g., landing a robot on the moon. The effects of various alternative design considerations and their impact of these decisions on mission success (or failure) can be measured in real time on a personal computer. This capability provides a high degree of efficiency for quickly providing information in NASA s evolving risk-based decision environment

  8. Incorporating the Technology Roadmap Uncertainties into the Project Risk Assessment

    International Nuclear Information System (INIS)

    Bonnema, B.E.

    2002-01-01

    This paper describes two methods, Technology Roadmapping and Project Risk Assessment, which were used to identify and manage the technical risks relating to the treatment of sodium bearing waste at the Idaho National Engineering and Environmental Laboratory. The waste treatment technology under consideration was Direct Vitrification. The primary objective of the Technology Roadmap is to identify technical data uncertainties for the technologies involved and to prioritize the testing or development studies to fill the data gaps. Similarly, project management's objective for a multi-million dollar construction project includes managing all the key risks in accordance to DOE O 413.3 - ''Program and Project Management for the Acquisition of Capital Assets.'' In the early stages, the Project Risk Assessment is based upon a qualitative analysis for each risk's probability and consequence. In order to clearly prioritize the work to resolve the technical issues identified in the Technology Roadmap, the issues must be cross- referenced to the project's Risk Assessment. This will enable the project to get the best value for the cost to mitigate the risks

  9. Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan

    International Nuclear Information System (INIS)

    Baide, D.G.; Webster, T.L.

    1995-12-01

    The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list

  10. Project risk management in the construction of high-rise buildings

    Science.gov (United States)

    Titarenko, Boris; Hasnaoui, Amir; Titarenko, Roman; Buzuk, Liliya

    2018-03-01

    This paper shows the project risk management methods, which allow to better identify risks in the construction of high-rise buildings and to manage them throughout the life cycle of the project. One of the project risk management processes is a quantitative analysis of risks. The quantitative analysis usually includes the assessment of the potential impact of project risks and their probabilities. This paper shows the most popular methods of risk probability assessment and tries to indicate the advantages of the robust approach over the traditional methods. Within the framework of the project risk management model a robust approach of P. Huber is applied and expanded for the tasks of regression analysis of project data. The suggested algorithms used to assess the parameters in statistical models allow to obtain reliable estimates. A review of the theoretical problems of the development of robust models built on the methodology of the minimax estimates was done and the algorithm for the situation of asymmetric "contamination" was developed.

  11. Increase plant safety and reduce cost by implementing risk-informed in-service inspection programs

    International Nuclear Information System (INIS)

    Billington, A.; Monette, P.

    2001-01-01

    The idea behind the program is that it is possible to 'inspect less, but inspect better'. In other words, the risk-informed In-Service Inspection (ISI) process is used to improve the effectiveness of examination of piping components, i.e. concentrate inspection resources and enhance inspection strategies on high safety significant locations, and reduce inspection requirements on others. The Westinghouse Owners Group (WOG) risk-informed ISI process has already been applied for full scope (Millstone 3, Surry 1) and limited scope (Beznau, Ringhals 4, Asco, Turkey Point 3). By examining the high safety significant piping segments for the different fluid piping systems, the total piping core damage frequency is reduced. In addition, more than 80% of the risk associated with potential pressure boundary failures is addressed with the WOG risk-informed ISI process, while typically less that 50% of this same risk is addressed by the current inspection programs. The risk-informed ISI processes are used to improve the effectiveness of inspecting safety-significant piping components, to reduce inspection requirements on other piping components, to evaluate improvements to plant availability and enhanced safety measures, including reduction of personnel radiation exposure, and to reduce overall Operation and Maintenance (O and M) costs while maintaining regulatory compliance. A description of the process as well as benefits from past projects is presented, since the methodology is applicable for WWER plant design. (author)

  12. Increase plant safety and reduce cost by implementing risk-informed In-Service Inspection programs

    International Nuclear Information System (INIS)

    Billington, A.; Monette, P.; Doumont, C.

    2000-01-01

    The idea behind the program is that it is possible to 'inspect less, but inspect better'. In other words, the risk-informed In-Service Inspection (ISI) process is used to improve the effectiveness of examination of piping components, i.e. concentrate inspection resources and enhance inspection strategies on high safety significant locations, and reduce inspection requirements on others. The Westinghouse Owners Group (WOG) risk-informed ISI process has already been applied for full scope (Millstone 3, Surry 1) and limited scope (Beznau, Ringhals 4, Asco, Turkey Point 3). By examining the high safety significant piping segments for the different fluid piping systems, the total piping core damage frequency is reduced. In addition, more than 80% of the risk associated with potential pressure boundary failures is addressed with the WOG risk-informed ISI process, while typically less than 50% of this same risk is addressed by the current inspection programs. The risk-informed ISI processes are used: to improve the effectiveness of inspecting safety-significant piping components; to reduce inspection requirements on other piping components; to evaluate improvements to plant availability and enhanced safety measures, including reduction of personnel radiation exposure; and to reduce overall Operation and Maintenance (O and M) costs while maintaining regulatory compliance. A description of the process as well as benefits of past projects is presented, since the methodology is applicable for VVER plant design. (author)

  13. Using prior risk-related knowledge to support risk management decisions: lessons learnt from a tunneling project.

    Science.gov (United States)

    Cárdenas, Ibsen Chivatá; Al-Jibouri, Saad S H; Halman, Johannes I M; van de Linde, Wim; Kaalberg, Frank

    2014-10-01

    The authors of this article have developed six probabilistic causal models for critical risks in tunnel works. The details of the models' development and evaluation were reported in two earlier publications of this journal. Accordingly, as a remaining step, this article is focused on the investigation into the use of these models in a real case study project. The use of the models is challenging given the need to provide information on risks that usually are both project and context dependent. The latter is of particular concern in underground construction projects. Tunnel risks are the consequences of interactions between site- and project-specific factors. Large variations and uncertainties in ground conditions as well as project singularities give rise to particular risk factors with very specific impacts. These circumstances mean that existing risk information, gathered from previous projects, is extremely difficult to use in other projects. This article considers these issues and addresses the extent to which prior risk-related knowledge, in the form of causal models, as the models developed for the investigation, can be used to provide useful risk information for the case study project. The identification and characterization of the causes and conditions that lead to failures and their interactions as well as their associated probabilistic information is assumed to be risk-related knowledge in this article. It is shown that, irrespective of existing constraints on using information and knowledge from past experiences, construction risk-related knowledge can be transferred and used from project to project in the form of comprehensive models based on probabilistic-causal relationships. The article also shows that the developed models provide guidance as to the use of specific remedial measures by means of the identification of critical risk factors, and therefore they support risk management decisions. Similarly, a number of limitations of the models are

  14. FIDIC contracts: analysis of the impact of general and particular conditions on the financial risk management in Romanian infrastructure projects

    Directory of Open Access Journals (Sweden)

    Constanţa-Nicoleta Bodea

    2016-12-01

    Full Text Available Construction projects are characterized by risks and uncertainties mainly due to technical and economic complexity. Risk management is an important tool in making decisions involving the identification and reduction, avoidance or transfer risk and uncertainties consequences of events that occurs during project implementation. For this reason, the objective of the contract between the beneficiary and the contractor is the allocation of risk. The distribution of risk in contracts for the execution of construction works was and is an ongoing challenge faced by parties having a significant impact on the type of contract is used. On the one hand, the beneficiaries tend to transfer to the contractors as many of the project risks and uncertainties, on the other hand, the contractors look to exploit any weakness contract, so as to reduce their impact on the expected profit. One of the most important risks assumed by the contractor by signing the contract which is also increasingly common in the current economic situation is the reduced financial capacity to support the project. A purely legal or purely technical interpretation is not meant to describe the complexity of issues related to implementation of construction projects. For this reason the authors have adopted a multi-disciplinary approach, which includes the legal issues related to the nature of the contract, but also the financial and technical aspects of construction projects. The paper aims to analyze how special contract clauses can influence the implementation of construction projects and in particular the financial management of contractors. The authors propose a model for analyzing the impact of FIDIC contract conditions applied on a case study of five transport infrastructure projects.

  15. Distance factor on reducing scattered radiation risk during interventional fluoroscopy

    International Nuclear Information System (INIS)

    Husaini Salleh; Mohd Khalid Matori; Muhammad Jamal Mat Isa; Zainal Jamaluddin; Mohd Firdaus Abdul Rahman; Mohd Khairusalih Mohd Zin

    2012-01-01

    Interventional Radiology (IR) is subspecialty of diagnostic radiology where minimally invasive procedures are performed using an x-ray as a guidance. This procedure can deliver high radiation doses to patient and medical staff compared with other radiological method due to long screening time. The use of proper shielding, shorten the exposure time and keep the distance are the practices to reduce scattered radiation risks to staff involve in this procedure. This project is to study the distance factor on reducing the scattered radiation effect to the medical staff. It also may provide the useful information which can be use to establish the scattered radiation profile during the IR for the sake of radiation protection and safety to the medical staff involved. (author)

  16. Risk analysis using AS/NZS 4360:2004, Bow-Tie diagram and ALARP on construction projects of Banyumanik Hospital

    Science.gov (United States)

    Sari, Diana Puspita; Pujotomo, Darminto; Wardani, Nadira Kusuma

    2017-11-01

    The Determination of risk is an uncertain event. Risks can have negative or positive impacts on project objectives. A project was defined as a series of activities and tasks that have a purpose, specifications, and limits of cost. Banyumanik Hospital Development Project is one of the construction projects in Semarang which have experienced some problems. The first problem is project delays on building stake. The second problem is delay of material supply. Finally, the problem that occurs is less management attention to health safety as evidenced by the unavailability of PPE for the workers. These problems will pose a risk to be a very important risk management performed by contractors at the Banyumanik Hospital Development Project to reduce the impact that would be caused by the risk borne by the provider of construction services. This research aim to risk identification, risk assessment and risk mitigation. Project risk management begins with the identification of risks based on the project life cycle. The risk assessment carried out by AS I NZS 4360: 2004 to the impacts of cost, time and quality. The results obtained from the method of AS I NZS 4360: 2004 is the risk that requires the handling of mitigation. Mitigated risk is the risk that had significant and high level. There are four risks that require risk mitigation with Bow-Tie diagrams which is work accidents, contract delays, material delays and design changes. Bow-Tie diagram method is a method for identifying causal and preventive action and recovery of a risk. Results obtained from Bow-Tie diagram method is a preventive action and recovery. This action is used as input to the ALARP method. ALARP method is used to determine the priority of the strategy proposed in the category broadly acceptable, tolerable, and unacceptable.

  17. WAYS TO IMPROVE RISK MANAGEMENT IN COMPLEX PROJECTS

    Directory of Open Access Journals (Sweden)

    Emilia IORDACHE

    2012-01-01

    Full Text Available Risk is present in all human activities; it can be associated with health, security, economy or environment. The goal of risk management is to control, prevent or decrease potential damages. Technically speaking, risk management means all the activities coordinated so as to orient and monitor an organization from the risk perspective. Risk management helps formulate the most adequate decisions by taking account of uncertainties and their effects upon the accomplishment of proposed goals, and argues the need to lay down and implement coercive, preventive actions typical of the management of a company. The benefits of good risk management and also the consequences of bad management shall undoubtedly be felt by an organization’s board, employees, shareholders, customers as well as by all other entities concerned with organizational performance. Projects generally include a number of risks in common with those in business as well as certain typical ones. In complex projects, it is this very feature – complexity – which generates the need to implement risk management for the purpose to diminish, remove, and monitor the risks which can influence the development of a project.

  18. Risk assessment for construction projects of transport infrastructure objects

    Science.gov (United States)

    Titarenko, Boris

    2017-10-01

    The paper analyzes and compares different methods of risk assessment for construction projects of transport objects. The management of such type of projects demands application of special probabilistic methods due to large level of uncertainty of their implementation. Risk management in the projects requires the use of probabilistic and statistical methods. The aim of the work is to develop a methodology for using traditional methods in combination with robust methods that allow obtaining reliable risk assessments in projects. The robust approach is based on the principle of maximum likelihood and in assessing the risk allows the researcher to obtain reliable results in situations of great uncertainty. The application of robust procedures allows to carry out a quantitative assessment of the main risk indicators of projects when solving the tasks of managing innovation-investment projects. Calculation of damage from the onset of a risky event is possible by any competent specialist. And an assessment of the probability of occurrence of a risky event requires the involvement of special probabilistic methods based on the proposed robust approaches. Practice shows the effectiveness and reliability of results. The methodology developed in the article can be used to create information technologies and their application in automated control systems for complex projects.

  19. ePORT, NASA's Computer Database Program for System Safety Risk Management Oversight (Electronic Project Online Risk Tool)

    Science.gov (United States)

    Johnson, Paul W.

    2008-01-01

    ePORT (electronic Project Online Risk Tool) provides a systematic approach to using an electronic database program to manage a program/project risk management processes. This presentation will briefly cover the standard risk management procedures, then thoroughly cover NASA's Risk Management tool called ePORT. This electronic Project Online Risk Tool (ePORT) is a web-based risk management program that provides a common framework to capture and manage risks, independent of a programs/projects size and budget. It is used to thoroughly cover the risk management paradigm providing standardized evaluation criterion for common management reporting, ePORT improves Product Line, Center and Corporate Management insight, simplifies program/project manager reporting, and maintains an archive of data for historical reference.

  20. Project Scheduling Based on Risk of Gas Transmission Pipe

    Science.gov (United States)

    Silvianita; Nurbaity, A.; Mulyadi, Y.; Suntoyo; Chamelia, D. M.

    2018-03-01

    The planning of a project has a time limit on which must be completed before or right at a predetermined time. Thus, in a project planning, it is necessary to have scheduling management that is useful for completing a project to achieve maximum results by considering the constraints that will exists. Scheduling management is undertaken to deal with uncertainties and negative impacts of time and cost in project completion. This paper explains about scheduling management in gas transmission pipeline project Gresik-Semarang to find out which scheduling plan is most effectively used in accordance with its risk value. Scheduling management in this paper is assissted by Microsoft Project software to find the critical path of existing project scheduling planning data. Critical path is the longest scheduling path with the fastest completion time. The result is found a critical path on project scheduling with completion time is 152 days. Furthermore, the calculation of risk is done by using House of Risk (HOR) method and it is found that the critical path has a share of 40.98 percent of all causes of the occurence of risk events that will be experienced.

  1. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  2. Correlational Study of Risk Management and Information Technology Project Success

    Science.gov (United States)

    Gillespie, Seth J.

    2014-01-01

    Many IT projects fail despite the best efforts to keep these projects within budget, schedule, and scope. Few studies have looked at the effect of project risk management tools and techniques on project success. The primary focus of this study was to examine the extent to which utilization of project risk management processes influence project…

  3. Managing Risks in Distributed Software Projects: An Integrative Framework

    DEFF Research Database (Denmark)

    Persson, John Stouby; Mathiassen, Lars; Boeg, Jesper

    2009-01-01

    techniques into an integrative framework for managing risks in distributed contexts. Subsequent implementation of a Web-based tool helped us refine the framework based on empirical evaluation of its practical usefulness.We conclude by discussing implications for both research and practice.......Software projects are increasingly geographically distributed with limited face-to-face interaction between participants. These projects face particular challenges that need carefulmanagerial attention. While risk management has been adopted with success to address other challenges within software...... development, there are currently no frameworks available for managing risks related to geographical distribution. On this background, we systematically review the literature on geographically distributed software projects. Based on the review, we synthesize what we know about risks and risk resolution...

  4. Risk Evaluation of a UHV Power Transmission Construction Project Based on a Cloud Model and FCE Method for Sustainability

    Directory of Open Access Journals (Sweden)

    Huiru Zhao

    2015-03-01

    Full Text Available In order to achieve the sustainable development of energy, Ultra High Voltage (UHV power transmission construction projects are being established in China currently. Their high-tech nature, the massive amount of money involved, and the need for multi-agent collaboration as well as complex construction environments bring many challenges and risks. Risk management, therefore, is critical to reduce the risks and realize sustainable development of projects. Unfortunately, many traditional risk assessment methods may not perform well due to the great uncertainty and randomness inherent in UHV power construction projects. This paper, therefore, proposes a risk evaluation index system and a hybrid risk evaluation model to evaluate the risk of UHV projects and find out the key risk factors. This model based on a cloud model and fuzzy comprehensive evaluation (FCE method combines the superiority of the cloud model for reflecting randomness and discreteness with the advantages of the fuzzy comprehensive evaluation method in handling uncertain and vague issues. For the sake of proving our framework, an empirical study of “Zhejiang-Fuzhou” UHV power transmission construction project is presented. As key contributions, we find the risk of this project lies at a “middle” to “high” level and closer to a “middle” level; the “management risk” and “social risk” are identified as the most important risk factors requiring more attention; and some risk control recommendations are proposed. This article demonstrates the value of our approach in risk identification, which seeks to improve the risk control level and the sustainable development of UHV power transmission construction projects.

  5. Managing a complex project using a risk-risk multiple domain matrix

    International Nuclear Information System (INIS)

    Pointurier, C.; Marle, F.; Jaber, H.

    2014-01-01

    This communication aims at presenting a clustering methodology applied to a complex project consisting of the delivery of three interdependent subsystems. This enables small and complementary task forces to be constituted, enhancing the communication and coordination on transverse issues related to the complexity of the whole system. The problem is to gather and exploit data for such systems, with numerous and heterogeneous risks of different domains (product, process, organization). The method consists in regrouping actors through the clustering of the risks they own. The result is a highlight on important and transverse risk interdependencies, within and between projects. These should not be neglected in order to avoid potential severe issues, whether during the project or during the exploitation of its deliverable. An application on a real program of plant implementation in the CEA-DAM is presented, with a sensitivity analysis of the clustering results to the inputs and chosen configurations of the problem. (authors)

  6. Comparisons on International Approaches of Business and Project Risk Management

    OpenAIRE

    Nadia Carmen ENE

    2005-01-01

    In this article we intend to present a comparative approach between three recognized international methodologies for risk management: RISKMAN, Project Management Institute Methodology-PMBoK and Project Risk Analysis and Management Guide (produced by Association for Project Management).

  7. AHP-based risk analysis of energy performance contracting projects in Russia

    International Nuclear Information System (INIS)

    Garbuzova-Schlifter, Maria; Madlener, Reinhard

    2016-01-01

    Understanding and properly managing risks that could potentially affect the target- and performance-based profits of energy performance contracting (EPC) projects are essential. It is particularly important for the establishment and success of energy service companies (ESCOs) acting in the vulnerable environment of the vast but highly energy-inefficient Russian market. This study systematically explores common risk factors and causes of risk associated with EPC projects executed in three Russian sectors: (1) industrial; (2) housing and communal services; and (3) public. Several interviews with the Russian EPC experts were accomplished and a qualitative risk assessment by using an analytic hierarchy process (AHP) approach. The data were obtained from a web-based questionnaire survey conducted among Russian EPC project executors. For each focus sector, a specific preference-based ranking of the identified risk factors and causes of risk was derived. The AHP results show that causes of risk related to the financial and regulatory aspects contribute most to the riskiness of EPC projects performed in all three focus sectors in Russia, calling for the special attention of EPC policy- and business-makers. Due to sectorial particularities and different actors involved, we conclude that there is a need for elaboration of sector-specific contractual schemes for EPC projects. - Highlights: • AHP- and survey-based study of energy performance contracting (EPC) projects in Russia. • Main risk factors and causes of risk associated with EPC projects are investigated. • In practice, lack of a feasible risk management approach in EPC projects. • Regulatory and financial risks contribute most to the EPC projects’ riskiness. • Elaboration of the sector-specific EPC project contractual scheme is required.

  8. Project management best practices: forging win-win partnerships and mitigating power project risk

    International Nuclear Information System (INIS)

    Trowsdale, R.

    2006-01-01

    This paper discusses aspects of project management to mitigate power project risk. end-to-end project development involves development phase, permitting phase, implementation phase, and operational phase. Each phase involves a number of different elements. In renewable energy project good management requires maintaining project discipline and schedule throughout all phases. Project success requires commercial competitiveness, fuel availability, power sales contracts, stake holder support, permitting, effective execution, construction and good technical performance

  9. Risk management in a large-scale CO2 geosequestration pilot project, Illinois, USA

    Science.gov (United States)

    Hnottavange-Telleen, K.; Chabora, E.; Finley, R.J.; Greenberg, S.E.; Marsteller, S.

    2011-01-01

    Like most large-scale infrastructure projects, carbon dioxide (CO 2) geological sequestration (GS) projects have multiple success criteria and multiple stakeholders. In this context "risk evaluation" encompasses multiple scales. Yet a risk management program aims to maximize the chance of project success by assessing, monitoring, minimizing all risks in a consistent framework. The 150,000-km2 Illinois Basin underlies much of the state of Illinois, USA, and parts of adjacent Kentucky and Indiana. Its potential for CO2 storage is first-rate among basins in North America, an impression that has been strengthened by early testing of the injection well of the Midwest Geological Sequestration Consortium's (MGSC's) Phase III large scale demonstration project, the Illinois Basin - Decatur Project (IBDP). The IBDP, funded by the U.S. Department of Energy's National Energy Technology Laboratory (NETL), represents a key trial of GS technologies and project-management techniques. Though risks are specific to each site and project, IBDP risk management methodologies provide valuable experience for future GS projects. IBDP views risk as the potential for negative impact to any of these five values: health and safety, environment, financial, advancing the viability and public acceptability of a GS industry, and research. Research goals include monitoring one million metric tonnes of injected CO2 in the subsurface. Risk management responds to the ways in which any values are at risk: for example, monitoring is designed to reduce uncertainties in parameter values that are important for research and system control, and is also designed to provide public assurance. Identified risks are the primary basis for risk-reduction measures: risks linked to uncertainty in geologic parameters guide further characterization work and guide simulations applied to performance evaluation. Formally, industry defines risk (more precisely risk criticality) as the product L*S, the Likelihood multiplied

  10. Research on Risk Manage of Power Construction Project Based on Bayesian Network

    Science.gov (United States)

    Jia, Zhengyuan; Fan, Zhou; Li, Yong

    With China's changing economic structure and increasingly fierce competition in the market, the uncertainty and risk factors in the projects of electric power construction are increasingly complex, the projects will face huge risks or even fail if we don't consider or ignore these risk factors. Therefore, risk management in the projects of electric power construction plays an important role. The paper emphatically elaborated the influence of cost risk in electric power projects through study overall risk management and the behavior of individual in risk management, and introduced the Bayesian network to the project risk management. The paper obtained the order of key factors according to both scene analysis and causal analysis for effective risk management.

  11. Risk Management and Uncertainty in Large Complex Public Projects

    DEFF Research Database (Denmark)

    Neerup Themsen, Tim; Harty, Chris; Tryggestad, Kjell

    Governmental actors worldwide are promoting risk management as a rational approach to man-age uncertainty and improve the abilities to deliver large complex projects according to budget, time plans, and pre-set project specifications: But what do we know about the effects of risk management...... on the abilities to meet such objectives? Using Callon’s (1998) twin notions of framing and overflowing we examine the implementation of risk management within the Dan-ish public sector and the effects this generated for the management of two large complex pro-jects. We show how the rational framing of risk...... management have generated unexpected costly outcomes such as: the undermining of the longer-term value and societal relevance of the built asset, the negligence of the wider range of uncertainties emerging during project processes, and constraining forms of knowledge. We also show how expert accountants play...

  12. Additives for reducing the toxicity of respirable crystalline silica. SILIFE project

    Science.gov (United States)

    Monfort, Eliseo; López-Lilao, Ana; Escrig, Alberto; Jesus Ibáñez, Maria; Bonvicini, Guliana; Creutzenberg, Otto; Ziemann, Christina

    2017-10-01

    Prolonged inhalation of crystalline silica particles has long been known to cause lung inflammation and development of the granulomatous and a fibrogenic lung disease known as silicosis. The International Agency for Research on Cancer (IARC) has classified Respirable Crystalline Silica (RCS) in the form of quartz and cristobalite from occupational sources as carcinogenic for humans (category 1). In this regard, numerous studies suggest that the toxicity of quartz is conditioned by the surface chemistry of the quartz particles and by the density and abundance of silanol groups. Blocking these groups to avoid their interaction with cellular membranes would theoretically be possible in order to reduce or even to eliminate the toxic effect. In this regard, the main contribution of the presented research is the development of detoxifying processes based on coating technologies at industrial scale, since the previous studies reported on literature were carried out at lab scale. The results obtained in two European projects showed that the wet method to obtain quartz surface coatings (SILICOAT project) allows a good efficiency in inhibiting the silica toxicity, and the preliminary results obtained in an ongoing project (SILIFE) suggest that the developed dry method to coat quartz surface is also very promising. The development of both coating technologies (wet and a dry) should allow these coating technologies to be applied to a high variety of industrial activities in which quartz is processed. For this reason, a lot of end-users of quartz powders will be potentially benefited from a reduced risk associated to the exposure to RCS.

  13. RISK MANAGEMENT IN A LARGE-SCALE NEW RAILWAY TRANSPORT SYSTEM PROJECT

    Directory of Open Access Journals (Sweden)

    Sunduck D. SUH, Ph.D., P.E.

    2000-01-01

    Full Text Available Risk management experiences of the Korean Seoul-Pusan high-speed railway (KTX project since the planning stage are evaluated. One can clearly see the interplay of engineering and construction risks, financial risks and political risks in the development of the KTX project, which is the peculiarity of large-scale new railway system projects. A brief description on evaluation methodology and overview of the project is followed by detailed evaluations on key differences in risks between conventional railway system and high-speed railway system, social and political risks, engineering and construction risks, and financial risks. Risks involved in system procurement process, such as proposal solicitation, evaluation, selection, and scope of solicitation are separated out and evaluated in depth. Detailed events resulting from these issues are discussed along with their possible impact on system risk. Lessons learned and further possible refinements are also discussed.

  14. Reducing O and M risks

    International Nuclear Information System (INIS)

    Patton, D.; LeMaster, D.

    1991-01-01

    This article examines the increasing requirement by investors and financiers of the use of an independent engineer for monitoring the performance of an independent energy project from the conceptual stage through the life span for the term of the loan. The topics include managing the risks from all perspectives, setting expectations, attention to detail. The article also includes a sidebar on loan agreement principles for operational facilities

  15. [Application of risk grading and classification for occupational hazards in risk management for a shipbuilding project].

    Science.gov (United States)

    Zeng, Wenfeng; Tan, Qiang; Wu, Shihua; Deng, Yingcong; Liu, Lifen; Wang, Zhi; Liu, Yimin

    2015-12-01

    To investigate the application of risk grading and classification for occupational hazards in risk management for a shipbuilding project. The risk management for this shipbuilding project was performed by a comprehensive application of MES evaluation, quality assessment of occupational health management, and risk grading and classification for occupational hazards, through the methods of occupational health survey, occupational health testing, and occupational health examinations. The results of MES evaluation showed that the risk of occupational hazards in this project was grade 3, which was considered as significant risk; Q value calculated by quality assessment of occupational health management was 0.52, which was considered to be unqualified; the comprehensive evaluation with these two methods showed that the integrated risk rating for this shipbuilding project was class D, and follow- up and rectification were needed with a focus on the improvement in health management. The application of MES evaluation and quality assessment of occupational health management in risk management for occupational hazards can achieve objective and reasonable conclusions and has good applicability.

  16. The use of intelligent systems for risk management in software projects

    Directory of Open Access Journals (Sweden)

    Oksana A. Gushchina

    2017-06-01

    Full Text Available Introduction: The article identifies the main risks of a software project, examines the use of different types of intelligent systems in the risk management process for software projects, discusses the basic methods used for process estimation and forecasting in the field of software engineering, identifies currently used empty expert systems, software systems for analysis and risk management of software projects. Materials and Methods: The author describes the peculiarities of risk management in the field of software engineering with involvement of intelligent systems. The intelligent techniques allow solving the control task with expert precision without the involvement of human experts. Results: The result of this work: – identification of the key risks of a software project (tax, legal, financial and commercial risks, IT risks, personnel risks, risks related to competitors, suppliers, marketing and demand and market; – investigation of the current, applied to risk management of software system projects, artificial intelligence, particularly expert systems and software tools for evaluation of the process results; – identification of the most popular empty expert systems (Clips, G2 and Leonardo and software products of the analysis of large databases (Orange, Weka, Rattle GUI, Apache Mahout, SCaViS, RapidMiner, Databionic ESOM Tools, ELKI, KNIME, Pandas and UIMA; – consideration of the cluster, correlation, regression, factor and dispersion analysis methods for the estimation and prediction of the processes of software engineering. Discussion and Conclusions: The results show the feasibility of the application of various intelligent systems in the risk management process. The analysis of methods of evaluating risks and the tendency of their application in the modern systems of intellectual analysis can serve as a start point for creating a unified system of risk management for software projects of medium and high complexity with a

  17. Financial risks in major investment projects

    International Nuclear Information System (INIS)

    Segelod, Esbjoern

    2006-01-01

    We have probably all read about large projects which proved far more expensive than anticipated, projects such as the Channel tunnel which cost 80% more than planned, and the oil pipeline between the oil field in Prudhoe Bay in Northern Alaska and the oil terminal in Vadez in the south which overran its budget by 1,000%. The purpose of this paper is to summarise our knowledge of the risk of cost escalation. Which projects are more likely than others to be hit by cost escalation, and why

  18. The 'polypill' to reduce cardiovascular risk

    DEFF Research Database (Denmark)

    Patel, Vinod; Pedersen, Oluf; Morrissey, John

    2004-01-01

    This article considers data from the Steno-2 multifactorial intervention study in type 2 diabetes to which are applied the United Kingdom Prospective Diabetes Study (UKPDS) risk engine. Mathematical analyses support the use of a 'polypill' to reduce cardiovascular risk in type 2 diabetes. It is s...

  19. Risk assessment by integrating interpretive structural modeling and Bayesian network, case of offshore pipeline project

    International Nuclear Information System (INIS)

    Wu, Wei-Shing; Yang, Chen-Feng; Chang, Jung-Chuan; Château, Pierre-Alexandre; Chang, Yang-Chi

    2015-01-01

    The sound development of marine resource usage relies on a strong maritime engineering industry. The perilous marine environment poses the highest risk to all maritime work. It is therefore imperative to reduce the risk associated with maritime work by using some analytical methods other than engineering techniques. This study addresses this issue by using an integrated interpretive structure modeling (ISM) and Bayesian network (BN) approach in a risk assessment context. Mitigating or managing maritime risk relies primarily on domain expert experience and knowledge. ISM can be used to incorporate expert knowledge in a systematic manner and helps to impose order and direction on complex relationships that exist among system elements. Working with experts, this research used ISM to clearly specify an engineering risk factor relationship represented by a cause–effect diagram, which forms the structure of the BN. The expert subjective judgments were further transformed into a prior and conditional probability set to be embedded in the BN. We used the BN to evaluate the risks of two offshore pipeline projects in Taiwan. The results indicated that the BN can provide explicit risk information to support better project management. - Highlights: • We adopt an integrated method for risk assessment of offshore pipeline projects. • We conduct semi-structural interview with the experts for risk factor identification. • Interpretive structural modeling helps to form the digraph of Bayesian network (BN) • We perform the risk analysis with the experts by building a BN. • Risk evaluations of two case studies using the BN show effectiveness of the methods

  20. Benefits from reducing risk of death

    Energy Technology Data Exchange (ETDEWEB)

    Krupnick, A

    1994-07-01

    Of the categories of benefits to individuals, reductions in the risk of premature mortality are of central. concern to the public and environmental policy makers. These benefits can include those from reductions in own- risk, for example, an individual's valuation of reducing his or her own mortality risks; reductions in risk to an individual's family, friends, or co-workers (i.e., of people known to the individual); and reductions in risks to unknown individuals. The last type would be an example of altruistic value. The overall goal is to measure the welfare change from a change in the current and/or future probability of dying. The willingness to pay (WTP) reflects the amount of income taken from a person that would leave him or her indifferent to a decrease in risk, whenever it occurs. When this value is divided by the risk change, the resulting value is called the 'value of a statistical life'. Another relevant measure appearing in the literature is the value of life-years saved. A final issue concerns the type of premature mortality risks one is valuing when environmental pollution is at issue. While most effort has gone into estimating the welfare effects of a change in current probability of death of healthy workers on the job, this is more relevant for characterizing the benefits of reducing accidental death risks than death from environmental causes. Exposure to pollutants raises risks of developing cancer, chronic heart, respiratory, and other diseases that raise mortality risks in the future. Such exposure also may raise current death risks for the very old and the sick. But, surely the pollution effect that is analogous to occupational health risks-pollution exposures high enough to raise current risks of death for the healthy, prime-age person-is insignificant in the United States.

  1. Benefits from reducing risk of death

    International Nuclear Information System (INIS)

    Krupnick, A.

    1994-01-01

    Of the categories of benefits to individuals, reductions in the risk of premature mortality are of central. concern to the public and environmental policy makers. These benefits can include those from reductions in own- risk, for example, an individual's valuation of reducing his or her own mortality risks; reductions in risk to an individual's family, friends, or co-workers (i.e., of people known to the individual); and reductions in risks to unknown individuals. The last type would be an example of altruistic value. The overall goal is to measure the welfare change from a change in the current and/or future probability of dying. The willingness to pay (WTP) reflects the amount of income taken from a person that would leave him or her indifferent to a decrease in risk, whenever it occurs. When this value is divided by the risk change, the resulting value is called the 'value of a statistical life'. Another relevant measure appearing in the literature is the value of life-years saved. A final issue concerns the type of premature mortality risks one is valuing when environmental pollution is at issue. While most effort has gone into estimating the welfare effects of a change in current probability of death of healthy workers on the job, this is more relevant for characterizing the benefits of reducing accidental death risks than death from environmental causes. Exposure to pollutants raises risks of developing cancer, chronic heart, respiratory, and other diseases that raise mortality risks in the future. Such exposure also may raise current death risks for the very old and the sick. But, surely the pollution effect that is analogous to occupational health risks-pollution exposures high enough to raise current risks of death for the healthy, prime-age person-is insignificant in the United States

  2. EC FP6 Siberia-focused Enviro-RISKS Project and its Outcomes

    Science.gov (United States)

    Baklanov, A. A.; Gordov, E. P.

    2009-04-01

    The FP6 Project "Man-induced Environmental Risks: Monitoring, Management and Remediation of Man-made Changes in Siberia" (Enviro-RISKS) strategic objective is to facilitate elaboration of solid scientific background and understanding of man-made associated environmental risks, their influence on all aspects of regional environment and optimal ways for it remediation by means of coordinated initiatives of a range of relevant RTD projects as well as to achieve their improved integration thus giving the projects additional synergy in current activities and potential for practical applications. List of Partners includes 3 leading European research organizations, 6 leading Russian research organizations (5 - located in Siberia) and 1 organization from Kazakhstan. Additionally several Russian and European research organizations joined to the Project as Associated Partners. Scientific background and foundation for the project performance is formed by a number of different levels RTD projects carried out by Partners and devoted to near all aspects of the theme. The set comprise coordinated/performed by partners EC funded thematic international projects, Russian national projects and other projects performed by NIS partners. Project outcomes include, in particular, development and support of the bilingual Enviro-RISKS web portal (http://risks.scert.ru/) as the major tool for disseminations of environmental information and project results; achieved level of development of Siberia Integrated Regional Study (SIRS, http://sirs.scert.ru/), which is the Siberia-focused NEESPI Environmental Mega-Project ongoing under the auspices of the Siberian Branch of the Russian Academy of Sciences. The main Project outcome are Memorandum on the state of the art of environmental RTD activity in Siberia and Recommendations on future environmental RTD activity in Siberia elaborated by four Working Experts Groups working in most important for Siberia Thematic Focuses. Three Thematic Focuses

  3. From risk management to uncertainty management: a significant change in project management

    Institute of Scientific and Technical Information of China (English)

    LI Gui-jun; ZHANG Yue-song

    2006-01-01

    Starting with the meanings of the terms "risk" and "uncertainty,"" he paper compares uncertainty management with risk management in project management. We bring some doubt to the use of "risk" and "uncertainty" interchangeably in project management and deem their scope, methods, responses, monitoring and controlling should be different too. Illustrations are given covering terminology, description, and treatment from different perspectives of uncertainty management and risk management. Furthermore, the paper retains that project risk management (PRM) processes might be modified to facilitate an uncertainty management perspective,and we support that project uncertainty management (PUM) can enlarge its contribution to improving project management performance, which will result in a significant change in emphasis compared with most risk management.

  4. The Role and the Effects of Risk Management in IT Projects Success

    Directory of Open Access Journals (Sweden)

    Otniel DIDRAGA

    2013-01-01

    Full Text Available The success of IT projects is influenced by risk and risk management according to the existing project management literature. The paper emphasizes the role of risk management and its contribution to projects success in the existing literature. The methodology applied is based on documentary study review and analysis of the concepts used by the literature. We analyzed the literature published between 1978 and 2012 from the main IT project management journals and publications. The results are that risk management is a very important component of the project management process and it is assumed implicitly to work in favour of project success. We also performed a quantitative analysis of how risk management processes affect the subjective and objective performance of IT projects in Romanian IT companies.

  5. Sexual HIV Risk Among Male Parolees and Their Female Partners: The Relate Project.

    Science.gov (United States)

    Comfort, Megan; Reznick, Olga Grinstead; Dilworth, Samantha E; Binson, Diane; Darbes, Lynae A; Neilands, Torsten B

    The massively disproportionate impact of America's prison boom on communities of color has raised questions about how incarceration may affect health disparities, including disparities in HIV. Primary partners are an important source of influence on sexual health. In this paper, we investigate sexual HIV risk among male-female couples following a man's release from prison. We draw upon data from the Relate Project, a novel cross-sectional survey of recently released men and their female partners in Oakland and San Francisco, California (N=344). Inferential analyses use the actor-partner model to explore actor and partner effects on sexual HIV risk outcomes. Dyadic analyses of sexual HIV risk among male parolees and their female partners paint a complex portrait of couples affected by incarceration and of partners' influences on each other. Findings indicate that demographic factors such as education level and employment status, individual psycho-social factors such as perception of risk, and relationship factors such as commitment and power affect sexual HIV risk outcomes. The Relate Project provides a novel dataset for the dyadic analysis of sexual risk among male parolees and their female partners, and results highlight the importance of focusing on the couple as a unit when assessing HIV risk and protective behaviors. Results also indicate potentially fruitful avenues for population-specific interventions that may help to reduce sexual health disparities among couples affected by incarceration.

  6. Effective Risk Management in Innovative Projects: A Case Study of the Construction of Energy-efficient, Sustainable Building of the Laboratory of Intelligent Building in Cracow

    Science.gov (United States)

    Krechowicz, Maria

    2017-10-01

    elimination. Three-parametric risk matrix was developed to make it possible to assess risk after implementing risk reactions. The possibility of implementing risk management was inversely proportional to the probability of unwanted event occurrence and its contribution to the project outcome. Introducing this risk management strategy allowed to significantly reduce the risk of the innovative construction project. It proved to be an effective tool to reduce risk to an acceptable level. It had a significant contribution to carrying out the project within the assumed time, budget and quality standards.

  7. The Effect of a Patient-Provider Educational Intervention to Reduce At-Risk Drinking on Changes in Health and Health-Related Quality of Life Among Older Adults: The Project SHARE Study.

    Science.gov (United States)

    Barnes, Andrew J; Xu, Haiyong; Tseng, Chi-Hong; Ang, Alfonso; Tallen, Louise; Moore, Alison A; Marshall, Deborah C; Mirkin, Michelle; Ransohoff, Kurt; Duru, O Kenrik; Ettner, Susan L

    2016-01-01

    At-risk drinking, defined as alcohol use that is excessive or potentially harmful in combination with select comorbidities or medications, affects about 10% of older adults in the United States and is associated with higher mortality. The Project SHARE intervention, which uses patient and provider educational materials, physician counseling, and health educator support, was designed to reduce at-risk drinking among this vulnerable population. Although an earlier study showed that this intervention was successful in reducing rates of at-risk drinking, it is unknown whether these reductions translate into improved health and health-related quality of life (HRQL). The aim of this study was to examine changes in health and HRQL of older adult at-risk drinkers resulting from a patient-provider educational intervention. A randomized controlled trial to compare the health and HRQL outcomes of patients assigned to the Project SHARE intervention vs. care as usual at baseline, 6- and 12-months post assignment. Control patients received usual care, which may or may not have included alcohol counseling. Intervention group patients received a personalized patient report, educational materials on alcohol and aging, a brief provider intervention, and a telephone health educator intervention. Current drinkers 60years and older accessing primary care clinics around Santa Barbara, California (N=1049). Data were collected from patients using baseline, 6- and 12-month mail surveys. Health and HRQL measures included mental and physical component scores (MCS and PCS) based on the Short Form-12v2 (SF-12v2), the SF-6D, which is also based on the SF-12, and the Geriatric Depression Scale (GDS). Adjusted associations of treatment assignment with these outcomes were estimated using generalized least squares regressions with random provider effects. Regressions controlled for age group, sex, race/ethnicity, marital status, education, household income, home ownership and the baseline value of

  8. The MABIC project: An effectiveness trial for reducing risk factors for eating disorders.

    Science.gov (United States)

    Sánchez-Carracedo, David; Fauquet, Jordi; López-Guimerà, Gemma; Leiva, David; Puntí, Joaquim; Trepat, Esther; Pàmias, Montserrat; Palao, Diego

    2016-02-01

    Challenges in the prevention of disordered eating field include moving from efficacy to effectiveness and developing an integrated approach to the prevention of eating and weight-related problems. A previous efficacy trial indicated that a universal disordered eating prevention program, based on the social cognitive model, media literacy educational approach and cognitive dissonance theory, reduced risk factors for disordered eating, but it is unclear whether this program has effects under more real-world conditions. This effectiveness trial tested whether this program has effects when previously trained community providers in an integrated approach to prevention implement the intervention. The research design involved a multi-center non-randomized controlled trial with baseline, post-test and 1-year follow-up measures. The sample included girls in the 8th grade from six schools (n = 152 girls) in a city near Barcelona (intervention group), and from eleven schools (n = 413 girls) in four neighboring towns (control group). The MABIC risk factors of disordered eating were assessed as main outcomes. Girls in the intervention group showed significantly greater reductions in beauty ideal internalization, disordered eating attitudes and weight-related teasing from pretest to 1-year follow-up compared to girls in the control group, suggesting that this program is effective under real-world conditions. Copyright © 2015 Elsevier Ltd. All rights reserved.

  9. PROJECT MANAGER SKILLS, RISK MANAGEMENT TOOLS

    Directory of Open Access Journals (Sweden)

    Vladut Iacob

    2013-12-01

    Full Text Available Although the projects are different from each other there are many common things that contribute to their success. Looked overall, the success of a project is the result of a multitude of factors. This person is considered the "engine" of the project. The man who makes the action set for the achievement of project objectives to be brought to an end. The project manager must have the technical knowledge and economic diverse. He should be able to choose a team and lead. You must be tenacious, combative, to know how to communicate both within the team and beyond. In a word, the project manager must have an impressive stock of knowledge, skills and abilities and appreciate as Peter Drucker, to "exist for the organization. To be its servant. Any management who forget this will only cause damage to the organization. "This study will focus on highlighting the skills of the project manager and their role in managing difficult situations or risk.

  10. Risk evaluation and mitigation in domestic photovoltaic projects: According to the UK climate polcy

    OpenAIRE

    Atigeh Chian, Milan

    2013-01-01

    2013 dissertation for MSc in Project Management. Selected by academic staff as a good example of a masters level dissertation. \\ud \\ud In the wake of financial crisis, many investors are faced with the uncertainty\\ud in investment decision as a result of the volatility in the market. In an\\ud attempt to reduce this risk of uncertainties, investors have therefore\\ud provided different method of risk management.\\ud Past studies has shown the importance of fund managers in the management\\ud of f...

  11. Managing to reduce nuclear financial risks

    International Nuclear Information System (INIS)

    Sillin, J.O.

    1984-01-01

    Nuclear power plant projects have weathered volatile economic conditions and uncertain regulatory climates with varying degrees of success. Some electric utilities can point to excellent construction and operating records, while others have suffered continuous difficulties. Are the success stories the result of good luck or effective management. This article identifies the potential sources of financial risk in a nuclear project and describes several methods available to management for controlling financial liability. A commitment to the highest level of technical and managerial skills is cited as a necessary component of all successful nuclear undertakings. 4 references, 3 figures, 2 tables

  12. Risk identification for PPP waste-to-energy incineration projects in China

    International Nuclear Information System (INIS)

    Song, Jinbo; Song, Danrong; Zhang, Xueqing; Sun, Yan

    2013-01-01

    Municipal solid waste (MSW) is regarded as a renewable energy source. In China, the sharp increase of MSW has precipitated the rapid growth of waste-to-energy (WTE) incineration plants. Private capital has been getting into the WTE incineration industry through the public–private partnership (PPP) arrangement. Due to the large construction cost and the long concession period commonly associated with this arrangement, a number of failures have emerged in PPP WTE incineration projects. The aim of this paper is to investigate the key risks of PPP WTE incineration projects in China and study the strategies for managing these risks by drawing experience and learning lessons from these projects. First, we analyzed the MSW management practices, relevant legislations and policies, and the development of PPP WTE incineration projects in China. Second, we identified ten key risks through interviews, surveys and visits to some selected projects, and provided detailed analysis of these risks. Lastly, we developed response strategies for these risks from the perspectives of both public and private sectors. - Highlights: • We analyze MSW management practices, relevant legislations and policies in China. • Through case study on PPP WTE incineration projects, ten key risks are identified. • Response strategies for key risks are developed

  13. Can enterprise architectures reduce failure in development projects?

    NARCIS (Netherlands)

    Janssen, M.F.W.H.A.; Klievink, B.

    2012-01-01

    Purpose: Scant attention has been given to the role of enterprise architecture (EA) in relationship to risk management in information system development projects. Even less attention has been given to the inter-organizational setting. The aim of this paper is to better understand this relationship.

  14. Relationship Between Perceived Risk of Falling and Adoption of Precautions to Reduce Fall Risk.

    Science.gov (United States)

    Blalock, Susan J; Gildner, Paula L; Jones, Jennifer L; Bowling, James M; Casteel, Carri H

    2016-06-01

    To better understand the relationship between perceived risk of falling and awareness and adoption of four specific precautions that older adults have taken to reduce this risk. Cross-sectional. Data were collected in in-person interviews conducted in the homes of study participants. Interviews conducted between March 2011 and September 2013 and lasted an average of 60-90 minutes. A stratified sampling strategy designed to enroll an equal number of homebound and nonhomebound participants was used. All participants (N = 164) were recruited from central North Carolina. Participants were asked about 1-year fall history, perceived risk of falling, restriction of activities because of fear of falling, awareness of four recommended fall prevention behaviors (exercise, annual medication review, bathroom grab bars, safe footwear), and current practice of these behaviors. In bivariate analyses, individuals who were aware of two behaviors recommended to reduce the risk of falling (exercise, use of safe footwear) and had adopted these behaviors perceived their risk of falling as lower than individuals who were aware of the recommended behaviors but had not adopted them. Moreover, in multivariate analyses, individuals who did not know that exercise is recommended to reduce the risk of falling perceived their risk of falling as lower than those who were aware of this recommendation and had adopted it. Individuals were least likely to be aware that medication reviews and exercise are recommended to reduce fall risk. Awareness of behaviors recommended to reduce fall risk appears necessary for adoption of these behaviors to reduce perceived risk. Fall-prevention campaigns should emphasize behaviors where awareness is low. © 2016, Copyright the Authors Journal compilation © 2016, The American Geriatrics Society.

  15. Functional neural correlates of reduced physiological falls risk

    Directory of Open Access Journals (Sweden)

    Hsu Chun

    2011-08-01

    Full Text Available Abstract Background It is currently unclear whether the function of brain regions associated with executive cognitive processing are independently associated with reduced physiological falls risk. If these are related, it would suggest that the development of interventions targeted at improving executive neurocognitive function would be an effective new approach for reducing physiological falls risk in seniors. Methods We performed a secondary analysis of 73 community-dwelling senior women aged 65 to 75 years old who participated in a 12-month randomized controlled trial of resistance training. Functional MRI data were acquired while participants performed a modified Eriksen Flanker Task - a task of selective attention and conflict resolution. Brain volumes were obtained using MRI. Falls risk was assessed using the Physiological Profile Assessment (PPA. Results After accounting for baseline age, experimental group, baseline PPA score, and total baseline white matter brain volume, baseline activation in the left frontal orbital cortex extending towards the insula was negatively associated with reduced physiological falls risk over the 12-month period. In contrast, baseline activation in the paracingulate gyrus extending towards the anterior cingulate gyrus was positively associated with reduced physiological falls risk. Conclusions Baseline activation levels of brain regions underlying response inhibition and selective attention were independently associated with reduced physiological falls risk. This suggests that falls prevention strategies may be facilitated by incorporating intervention components - such as aerobic exercise - that are specifically designed to induce neurocognitive plasticity. Trial Registration ClinicalTrials.gov Identifier: NCT00426881

  16. A new approach to reduce uncertainties in space radiation cancer risk predictions.

    Directory of Open Access Journals (Sweden)

    Francis A Cucinotta

    Full Text Available The prediction of space radiation induced cancer risk carries large uncertainties with two of the largest uncertainties being radiation quality and dose-rate effects. In risk models the ratio of the quality factor (QF to the dose and dose-rate reduction effectiveness factor (DDREF parameter is used to scale organ doses for cosmic ray proton and high charge and energy (HZE particles to a hazard rate for γ-rays derived from human epidemiology data. In previous work, particle track structure concepts were used to formulate a space radiation QF function that is dependent on particle charge number Z, and kinetic energy per atomic mass unit, E. QF uncertainties where represented by subjective probability distribution functions (PDF for the three QF parameters that described its maximum value and shape parameters for Z and E dependences. Here I report on an analysis of a maximum QF parameter and its uncertainty using mouse tumor induction data. Because experimental data for risks at low doses of γ-rays are highly uncertain which impacts estimates of maximum values of relative biological effectiveness (RBEmax, I developed an alternate QF model, denoted QFγAcute where QFs are defined relative to higher acute γ-ray doses (0.5 to 3 Gy. The alternate model reduces the dependence of risk projections on the DDREF, however a DDREF is still needed for risk estimates for high-energy protons and other primary or secondary sparsely ionizing space radiation components. Risk projections (upper confidence levels (CL for space missions show a reduction of about 40% (CL∼50% using the QFγAcute model compared the QFs based on RBEmax and about 25% (CL∼35% compared to previous estimates. In addition, I discuss how a possible qualitative difference leading to increased tumor lethality for HZE particles compared to low LET radiation and background tumors remains a large uncertainty in risk estimates.

  17. Does Metformin Reduce Cancer Risks? Methodologic Considerations.

    Science.gov (United States)

    Golozar, Asieh; Liu, Shuiqing; Lin, Joeseph A; Peairs, Kimberly; Yeh, Hsin-Chieh

    2016-01-01

    The substantial burden of cancer and diabetes and the association between the two conditions has been a motivation for researchers to look for targeted strategies that can simultaneously affect both diseases and reduce their overlapping burden. In the absence of randomized clinical trials, researchers have taken advantage of the availability and richness of administrative databases and electronic medical records to investigate the effects of drugs on cancer risk among diabetic individuals. The majority of these studies suggest that metformin could potentially reduce cancer risk. However, the validity of this purported reduction in cancer risk is limited by several methodological flaws either in the study design or in the analysis. Whether metformin use decreases cancer risk relies heavily on the availability of valid data sources with complete information on confounders, accurate assessment of drug use, appropriate study design, and robust analytical techniques. The majority of the observational studies assessing the association between metformin and cancer risk suffer from methodological shortcomings and efforts to address these issues have been incomplete. Future investigations on the association between metformin and cancer risk should clearly address the methodological issues due to confounding by indication, prevalent user bias, and time-related biases. Although the proposed strategies do not guarantee a bias-free estimate for the association between metformin and cancer, they will reduce synthesis of and reporting of erroneous results.

  18. Risk analysis for renewable energy projects due to constraints arising

    Science.gov (United States)

    Prostean, G.; Vasar, C.; Prostean, O.; Vartosu, A.

    2016-02-01

    Starting from the target of the European Union (EU) to use renewable energy in the area that aims a binding target of 20% renewable energy in final energy consumption by 2020, this article illustrates the identification of risks for implementation of wind energy projects in Romania, which could lead to complex technical implications, social and administrative. In specific projects analyzed in this paper were identified critical bottlenecks in the future wind power supply chain and reasonable time periods that may arise. Renewable energy technologies have to face a number of constraints that delayed scaling-up their production process, their transport process, the equipment reliability, etc. so implementing these types of projects requiring complex specialized team, the coordination of which also involve specific risks. The research team applied an analytical risk approach to identify major risks encountered within a wind farm project developed in Romania in isolated regions with different particularities, configured for different geographical areas (hill and mountain locations in Romania). Identification of major risks was based on the conceptual model set up for the entire project implementation process. Throughout this conceptual model there were identified specific constraints of such process. Integration risks were examined by an empirical study based on the method HAZOP (Hazard and Operability). The discussion describes the analysis of our results implementation context of renewable energy projects in Romania and creates a framework for assessing energy supply to any entity from renewable sources.

  19. The STABALID project: Risk analysis of stationary Li-ion batteries for power system applications

    International Nuclear Information System (INIS)

    Soares, F.J.; Carvalho, L.; Costa, I.C.; Iria, J.P.; Bodet, J.-M.; Jacinto, G.; Lecocq, A.; Roessner, J.; Caillard, B.; Salvi, O.

    2015-01-01

    This work presents a risk analysis performed to stationary Li-ion batteries within the framework of the STABALID project. The risk analysis had as main objective analysing the variety of hazards and dangerous situations that might be experienced by the battery during its life cycle and providing useful information on how to prevent or manage those undesired events. The first task of the risk analysis was the identification of all the hazards (or risks) that may arise during the battery life cycle. Afterwards, the hazards identified were mapped in the different stages of the battery life cycle and two analyses were performed for each stage: an internal problem analysis and an external peril analysis. For both, the dangerous phenomena and the undesirable events resulting from each hazard was evaluated in terms of probability of occurrence and severity. Then, a risk assessment was carried out according to a predefined risk matrix and a preliminary set of risk mitigation measures were proposed to reduce their probability of occurrence and/or their severity level. The results obtained show that it is possible to reduce the probability of occurrence/severity of all the risks associated to the battery life cycle to acceptable or tolerable levels. - Highlights: • Methodology for a detailed risk analysis of stationary Li-ion batteries. • Various hazards and dangerous situations are analysed with high detail. • Useful information on how to prevent or manage the undesired events is provided. • Measures to reduce probability of occurrence/severity of the risks are presented

  20. Extreme Geohazards: Reducing the Disaster Risk and Increasing Resilience

    Science.gov (United States)

    Plag, Hans-Peter; Stein, Seth; Brocklebank, Sean; Jules-Plag, Shelley; Marsh, Stuart; Campus, Paola

    2013-04-01

    Extreme geohazards have the potential to escalate the global sustainability crisis and put us close to the boundaries of the safe operating space for humanity. Exposure of human assets to geohazards has increased dramatically in recent decades, and the sensitivity of the built environment and the embedded socio-economic fabric have changed. We are putting the urban environment, including megacities, in harm's way. Paradoxically, innovation during recent decades, in particular, urban innovation, has increased the disaster risk and coupled this risk to the sustainability crisis. Only more innovation can reduce disaster risk and lead us out of the sustainability crisis. Extreme geohazards (volcanic eruptions, earthquakes, tsunamis) that occurred regularly throughout the last few millennia mostly did not cause major disasters because population density was low and the built environment was not sprawling into hazardous areas to the same extent as today. Similar extreme events today would cause unparalleled damage on a global scale and could worsen the sustainability crisis. Simulation of these extreme hazards under present conditions can help to assess the disaster risk. The Geohazards Community of Practice of the Group on Earth Observations (GEO) with support from the European Science Foundation is preparing a white paper assessing the contemporary disaster risks associated with extreme geohazards and developing a vision for science and society to engage in deliberations addressing this risk (see http://www.geohazcop.org/projects/extgeowp). Risk awareness and monitoring is highly uneven across the world, and this creates two kinds of problems. Firstly, potential hazards are much more closely monitored in wealthy countries than in the developing world. But the largest hazards are global in nature, and it is critical to get as much forewarning as possible to develop an effective response. The disasters and near-misses of the past show that adherence to scientific

  1. Revenue Risk Modelling and Assessment on BOT Highway Project

    Science.gov (United States)

    Novianti, T.; Setyawan, H. Y.

    2018-01-01

    The infrastructure project which is considered as a public-private partnership approach under BOT (Build-Operate-Transfer) arrangement, such as a highway, is risky. Therefore, assessment on risk factors is essential as the project have a concession period and is influenced by macroeconomic factors and consensus period. In this study, pre-construction risks of a highway were examined by using a Delphi method to create a space for offline expert discussions; a fault tree analysis to map intuition of experts and to create a model from the underlying risk events; a fuzzy logic to interpret the linguistic data of risk models. The loss of revenue for risk tariff, traffic volume, force majeure, and income were then measured. The results showed that the loss of revenue caused by the risk tariff was 10.5% of the normal total revenue. The loss of revenue caused by the risk of traffic volume was 21.0% of total revenue. The loss of revenue caused by the force majeure was 12.2% of the normal income. The loss of income caused by the non-revenue events was 6.9% of the normal revenue. It was also found that the volume of traffic was the major risk of a highway project because it related to customer preferences.

  2. Rationale and study design for a randomised controlled trial to reduce sedentary time in adults at risk of type 2 diabetes mellitus: project stand (Sedentary Time ANd diabetes

    Directory of Open Access Journals (Sweden)

    Wilmot Emma G

    2011-12-01

    Full Text Available Abstract Background The rising prevalence of Type 2 Diabetes Mellitus (T2DM is a major public health problem. There is an urgent need for effective lifestyle interventions to prevent the development of T2DM. Sedentary behaviour (sitting time has recently been identified as a risk factor for diabetes, often independent of the time spent in moderate-to-vigorous physical activity. Project STAND (Sedentary Time ANd Diabetes is a study which aims to reduce sedentary behaviour in younger adults at high risk of T2DM. Methods/Design A reduction in sedentary time is targeted using theory driven group structured education. The STAND programme is subject to piloting and process evaluation in line with the MRC framework for complex interventions. Participants are encouraged to self-monitor and self-regulate their behaviour. The intervention is being assessed in a randomised controlled trial with 12 month follow up. Inclusion criteria are a aged 18-40 years with a BMI in the obese range; b 18-40 years with a BMI in the overweight range plus an additional risk factor for T2DM. Participants are randomised to the intervention (n = 89 or control (n = 89 arm. The primary outcome is a reduction in sedentary behaviour at 12 months as measured by an accelerometer (count Conclusions This is the first UK trial to address sedentary behaviour change in a population of younger adults at risk of T2DM. The results will provide a platform for the development of a range of future multidisciplinary interventions in this rapidly expanding high-risk population. Trial registration Current controlled trials ISRCTN08434554, MRC project 91409.

  3. Identifying and managing risk in international construction projects

    Directory of Open Access Journals (Sweden)

    Sachin Kerur

    2012-04-01

    Full Text Available Over the last decade, major construction projects have increasingly arisen in countries or regions that lack specialist, expert construction contractors, suppliers and consultants. Steps are being taken by governments in the Middle East, Eastern Europe, China, India and developing markets to address national infrastructure deficits, and by so doing, are creating new regions of booming construction demand. When coupled with anaemic growth in developed markets such as the United Kingdom, the USA and Western Europe, foreign markets present attractive opportunities to the global construction industry. However, foreign markets are littered with the cautionary tales of international contractors and consultants that have failed to grasp the intricacies and risks of operating in a new environment and have failed to capitalise on the opportunities available. By identifying the classes of risks, and undertaking detailed analysis, ranking and mitigation of relevant jurisdictional risks, participants in international construction projects will increase the likelihood of project success and commercial longevity in the new jurisdiction. Risk identification and assessment is not a science but an art, and while there are many potential approaches to the issue, we propose that our strategies for identifying, assessing, ranking and mitigating jurisdictional risks offer new international players a good chance of commercial success.

  4. Effective Project Risk management in Micro Companies : Case study for Persona Optima Iceland ehf.

    OpenAIRE

    Bražinskaitė, Justina

    2011-01-01

    This study is meant to be a guide for micro companies regarding effective project risk management. The main purpose of this thesis is to introduce project risk management and build a user-friendly managerial model toward effective project risk management in micro companies. The research is based on a case company Persona Optima Iceland ehf. analysis. The study investigates risk management, uncertainties and risks in projects, project risk management, its models and particularities in orde...

  5. Comparative risk analysis for the Rocky Flats Plant integrated project planning

    International Nuclear Information System (INIS)

    Jones, M.E.; Shain, D.I.

    1994-01-01

    The Rocky Flats Plant is developing, with active stakeholder participation, a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs, relative risks to workers and the public, and waste disposition are all needed. Comparative Risk Analysis employs both incremental risk and cumulative risk evaluations to compare risks from postulated options or endstates and is an analytical tool for the Rocky Flats Plant Integrated Project Planning which can assist a decision-maker in evaluating relative risks among proposed remediation activity. However, risks from all of the remediation activities, decontamination and decommissioning activities, and normal ongoing operations are imposed upon the Rocky Flats workers, the surrounding public, and the environment. Comparative Risk Analysis will provide risk information, both human health and ecological, to aid in reducing unnecessary resource and monetary expenditures by focusing these resources on the largest risks first. Comparative Risk Analysis has been developed to aggregate various incremental risk estimates to develop a site cumulative risk estimate. The Comparative Risk Analysis methodology Group, consisting of community stakeholders, was established. Early stakeholder involvement in the risk analysis methodology development provides an opportunity for stakeholders to influence the risk information delivered to a decision-maker. This paper discusses development of the Comparative Risk Analysis methodology, stakeholder participation and lessons learned from these challenges

  6. Tools and Methods for Risk Management in Multi-Site Engineering Projects

    Science.gov (United States)

    Zhou, Mingwei; Nemes, Laszlo; Reidsema, Carl; Ahmed, Ammar; Kayis, Berman

    In today's highly global business environment, engineering and manufacturing projects often involve two or more geographically dispersed units or departments, research centers or companies. This paper attempts to identify the requirements for risk management in a multi-site engineering project environment, and presents a review of the state-of-the-art tools and methods that can be used to manage risks in multi-site engineering projects. This leads to the development of a risk management roadmap, which will underpin the design and implementation of an intelligent risk mapping system.

  7. Risk analysis in the management of urban construction projects from the perspective of the employer and the contractor

    Directory of Open Access Journals (Sweden)

    Mohammad Taghipour

    2015-12-01

    Full Text Available Imbalance between anticipated and actual progress in the development of urban construction projects suggests that there are many obstacles and risks which not only causes the urban management be unsustainable, but the reconstruction and development of urban space is also seriously threatened. In this study, the library research on issues related to the risk of construction projects was done, then some interviews were conducted with experts and managers informed and involved in the projects, and finally questionnaires were distributed to identify and classify the impact of the risks of the implementation of the construction projects. After analyzing the data, the results indicated that the experts listed the most significant risks as the delays in the payment of contractors' claims and statements due to the lack of handling financial instruments, the governance of relationships rather than rules in the tenders resulting from employer actions, low commitment to the quality of work provided by their subcontractors, failure to complete the detail engineering by foreign contractors on time, weaknesses in contractors' financial resources, and offering lower prices than reasonable by contractors to win the tender. All of these require special attention and other kinds of risks are important at the next level. Finally, the solutions for eliminating or reducing risks in high-risk areas have been offered to provide tranquility for contractors and employers.

  8. Managing complex, high risk projects a guide to basic and advanced project management

    CERN Document Server

    Marle, Franck

    2016-01-01

    Maximizing reader insights into project management and handling complexity-driven risks, this book explores propagation effects, non-linear consequences, loops, and the emergence of positive properties that may occur over the course of a project. This book presents an introduction to project management and analysis of traditional project management approaches and their limits regarding complexity. It also includes overviews of recent research works about project complexity modelling and management as well as project complexity-driven issues. Moreover, the authors propose their own new approaches, new methodologies and new tools which may be used by project managers and/or researchers and/or students in the management of their projects. These new elements include project complexity definitions and frameworks, multi-criteria approaches for project complexity measurement, advanced methodologies for project management (propagation studies to anticipate potential behaviour of the project, and clustering approaches...

  9. Project risk management in complex petrochemical system

    Directory of Open Access Journals (Sweden)

    Kirin Snežana

    2012-01-01

    Full Text Available Investigation of risk in complex industrial systems, as well as evaluation of main factors influencing decision making and implementation process using large petrochemical company as an example, has proved the importance of successful project risk management. This is even more emphasized when analyzing systems with complex structure, i.e. with several organizational units. It has been shown that successful risk management requires modern methods, based on adequate application of statistical analysis methods.

  10. Shell’s use of science in de-risking projects

    CSIR Research Space (South Africa)

    Rossouw, N

    2017-10-01

    Full Text Available This presentation discusses Shell’s use of science in de-risking projects. The presentation includes examples of applying science in the De-Risking process, supporting scientific research and De-Risking the Karoo Basin....

  11. Risk Management in Future Romanian E-Government 2.0 Projects

    Directory of Open Access Journals (Sweden)

    Didraga Otniel

    2015-08-01

    Full Text Available E-government public services in Romania must follow unitary procedures considering the new requirements of the European Union from the Digital Agenda for Europe Strategy 2020. E-government 2.0 has to be implemented because of the cultural and behavioral transformations in the interaction between governments and users of e-services. E-government 2.0 projects use tools and techniques of social media to accomplish their goals. This article examines the possible risk categories and the risk management procedures needed to mitigate risks in future Romanian e-government projects, according to the strategic lines of development for the Digital Agenda. We propose a risk management plan for the e-government lines of action within the strategic lines of development that includes identifying, assessing, and mitigating the risks. New and modernized government services through e-government 2.0 projects that apply risk management will bring a significant improvement in how citizens and businesses relate to government and will increase the use of e-government services.

  12. Comprehensive management of project changes

    Directory of Open Access Journals (Sweden)

    Aljaž Stare

    2010-06-01

    Full Text Available The goal of this research was to examine how project changes can be prevented, and how to reduce their negative impact. Theoretical research examined risk management, project control and change management. Based on the study a “Comprehensive Change Management Model” was developed and verified after conducting empirical research in Slovenian enterprises. The research confirmed that risk management identifies possible changes and reduces their impact; project control ensures the timely detection of changes and an efficient response, while formal change management ensures the effective implementation of changes. The combined functioning of all three areas ensures effective project execution.

  13. Development of Risk Uncertainty Factors from Historical NASA Projects

    Science.gov (United States)

    Amer, Tahani R.

    2011-01-01

    NASA is a good investment of federal funds and strives to provide the best value to the nation. NASA has consistently budgeted to unrealistic cost estimates, which are evident in the cost growth in many of its programs. In this investigation, NASA has been using available uncertainty factors from the Aerospace Corporation, Air Force, and Booz Allen Hamilton to develop projects risk posture. NASA has no insight into the developmental of these factors and, as demonstrated here, this can lead to unrealistic risks in many NASA Programs and projects (P/p). The primary contribution of this project is the development of NASA missions uncertainty factors, from actual historical NASA projects, to aid cost-estimating as well as for independent reviews which provide NASA senior management with information and analysis to determine the appropriate decision regarding P/p. In general terms, this research project advances programmatic analysis for NASA projects.

  14. A review on disaster risk mitigation in the oil and gas project

    Science.gov (United States)

    Rodhi, N. N.; Anwar, N.; Wiguna, I. P. A.

    2018-01-01

    In addition to the very complex risks, hazards potentially lead to disasters in the oil and gas projects. These risks can certainly be anticipated with the application of risk management, but an unsystematic and ineffective implementation of risk management will still bring adverse impacts. According to the eleven risk management principles in ISO 31000:2009, the application of risk management must pay attention to all aspects, both internal and external factors. Thus, this paper aims to identify variables that could affect the disaster mitigation efforts of oil and gas projects. This research began with literature study to determine the problems of risk management in oil and gas projects, so the affecting variables as the study objectives can be specified subsequently based on the literature review as well. The variables that must be considered in the efforts of disaster risk mitigation of oil and gas project are the risk factors and sustainability aspect.

  15. Analyzing Integrated Cost-Schedule Risk for Complex Product Systems R&D Projects

    Directory of Open Access Journals (Sweden)

    Zhe Xu

    2014-01-01

    Full Text Available The vast majority of the research efforts in project risk management tend to assess cost risk and schedule risk independently. However, project cost and time are related in reality and the relationship between them should be analyzed directly. We propose an integrated cost and schedule risk assessment model for complex product systems R&D projects. Graphical evaluation review technique (GERT, Monte Carlo simulation, and probability distribution theory are utilized to establish the model. In addition, statistical analysis and regression analysis techniques are employed to analyze simulation outputs. Finally, a complex product systems R&D project as an example is modeled by the proposed approach and the simulation outputs are analyzed to illustrate the effectiveness of the risk assessment model. It seems that integrating cost and schedule risk assessment can provide more reliable risk estimation results.

  16. Nutritional strategies to reduce falls risk in older people.

    Science.gov (United States)

    Nash, Louise; Bergin, Nick

    2018-03-23

    A literature review found an association between increased falls risk and malnutrition, sarcopenia, vitamin D deficiency and dehydration. Strategies to identify, prevent and treat these conditions can help to reduce falls risk in at-risk groups such as frail, older people. Nurses can reduce falls risk in older people by raising awareness of risk factors and embedding nutritional strategies in local falls reduction strategies. ©2018 RCN Publishing Company Ltd. All rights reserved. Not to be copied, transmitted or recorded in any way, in whole or part, without prior permission of the publishers.

  17. Does retirement reduce the risk of myocardial infarction?

    DEFF Research Database (Denmark)

    Olesen, Kasper; Rugulies, Reiner; Rod, Naja Hulvej

    2014-01-01

    BACKGROUND: Recent studies have suggested that retirement may have beneficial effects on health outcomes. In this study we examined whether the risk of myocardial infarction (MI) was reduced following retirement in a Danish population sample. METHODS: Participants were 617 511 Danish workers, born...... of 1.11 (95% confidence interval: 1.06, 1.16) when comparing retirees with active workers of the same age. CONCLUSIONS: This study does not support the hypothesis that retirement reduces risk of MI. On the contrary, we find that retirement is associated with a modestly increased risk of MI....

  18. Shedding New Light on Project Portfolio Risk Management

    Directory of Open Access Journals (Sweden)

    Mariusz Hofman

    2017-10-01

    Full Text Available This paper constitutes an innovative attempt to analyse the risks and negative phenomena dependencies within a project portfolio. Based on the available literature, the risks and negative phenomena (that is, the problems with the availability of resources, interpersonal conflicts, irregularities in the portfolio balance, etc. specific to a project portfolio were identified. Theoretical constructs were then used to connect the identified risks with the negative phenomena. Structural equations were used to confirm the existence and quality of these constructs, as well as models describing connections between phenomena. The determination of the structural equations also provided a setting in which statistical methods (χ2, RMSEA and CFI could be used to investigate the level of fit of the constructs and models to the empirical data.

  19. Research into specific risk assessment in project financing

    Directory of Open Access Journals (Sweden)

    Ivana Bestvina Bukvić

    2013-12-01

    Full Text Available An assessment of investment justification in terms of risk enables the decision maker (investor to select, among available alternatives, the one with the most favourable correlation between the expected profit and assumed risk. At the micro level, the uncertainty of business success is extremely high in production activities, which is an additional incentive for taking a comprehensive approach to the issue of investment decision-making and the development of risk assessment techniques applicable in this particular segment of industry. Given the complexity of the manufacturing process, the length of the production cycle, market conditions, and entity-specific risks (which are difficult to measure, projects in manufacturing industry require a detailed and comprehensive assessment of specific risk factors and their cost-effectiveness. Ne - vertheless, since specific risks can be diversified, investment proposal assessments in practice usually do not cover their quantification and analysis. However, the majority of business entities do not have enough active projects in various industries to be able to fully diversify their business and thus minimize the level of specific risks. The impact of specific factors becomes one of the most important elements for business success. This paper analyses how far risk assessment methods regarding specific risks are used in practice. Furthermore, it analyses the significance of specific risks for total investment risk. This study gives new insi - ghts into the significance of specific risks to the overall investment assessment and the need for permanent development of traditionally used investment assessment models.

  20. NASA Space Radiation Risk Project: Overview and Recent Results

    Science.gov (United States)

    Blattnig, Steve R.; Chappell, Lori J.; George, Kerry A.; Hada, Megumi; Hu, Shaowen; Kidane, Yared H.; Kim, Myung-Hee Y.; Kovyrshina, Tatiana; Norman, Ryan B.; Nounu, Hatem N.; hide

    2015-01-01

    The NASA Space Radiation Risk project is responsible for integrating new experimental and computational results into models to predict risk of cancer and acute radiation syndrome (ARS) for use in mission planning and systems design, as well as current space operations. The project has several parallel efforts focused on proving NASA's radiation risk projection capability in both the near and long term. This presentation will give an overview, with select results from these efforts including the following topics: verification, validation, and streamlining the transition of models to use in decision making; relative biological effectiveness and dose rate effect estimation using a combination of stochastic track structure simulations, DNA damage model calculations and experimental data; ARS model improvements; pathway analysis from gene expression data sets; solar particle event probabilistic exposure calculation including correlated uncertainties for use in design optimization.

  1. Proposal of a risk-factor-based analytical approach for integrating occupational health and safety into project risk evaluation.

    Science.gov (United States)

    Badri, Adel; Nadeau, Sylvie; Gbodossou, André

    2012-09-01

    Excluding occupational health and safety (OHS) from project management is no longer acceptable. Numerous industrial accidents have exposed the ineffectiveness of conventional risk evaluation methods as well as negligence of risk factors having major impact on the health and safety of workers and nearby residents. Lack of reliable and complete evaluations from the beginning of a project generates bad decisions that could end up threatening the very existence of an organization. This article supports a systematic approach to the evaluation of OHS risks and proposes a new procedure based on the number of risk factors identified and their relative significance. A new concept called risk factor concentration along with weighting of risk factor categories as contributors to undesirable events are used in the analytical hierarchy process multi-criteria comparison model with Expert Choice(©) software. A case study is used to illustrate the various steps of the risk evaluation approach and the quick and simple integration of OHS at an early stage of a project. The approach allows continual reassessment of criteria over the course of the project or when new data are acquired. It was thus possible to differentiate the OHS risks from the risk of drop in quality in the case of the factory expansion project. Copyright © 2011 Elsevier Ltd. All rights reserved.

  2. A Framework for Integrating Knowledge Management with Risk Management for Information Technology Projects (RiskManiT)

    Science.gov (United States)

    Karadsheh, Louay A.

    2010-01-01

    This research focused on the challenges experienced when executing risk management activities for information technology projects. The lack of adequate knowledge management support of risk management activities has caused many project failures in the past. The research objective was to propose a conceptual framework of the Knowledge-Based Risk…

  3. Improvement of the projection models for radiogenic cancer risk

    International Nuclear Information System (INIS)

    Tong Jian

    2005-01-01

    Calculations of radiogenic cancer risk are based on the risk projection models for specific cancer sites. Improvement has been made for the parameters used in the previous models including introductions of mortality and morbidity risk coefficients, and age-/ gender-specific risk coefficients. These coefficients have been applied to calculate the radiogenic cancer risks for specific organs and radionuclides under different exposure scenarios. (authors)

  4. A review of risk management process in construction projects of developing countries

    Science.gov (United States)

    Bahamid, R. A.; Doh, S. I.

    2017-11-01

    In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.

  5. Identification of risk factors affecting construction of projects: The case of emerging economy

    Directory of Open Access Journals (Sweden)

    Chipo Mellania Maseko

    2017-12-01

    Full Text Available Controlling project risks has become a daunting task in construction and this can be attributed to issues such as the nature of modern projects. The challenge is that risk appears unannounced at any project phase for various reasons and thereby affecting the performance and the success of unprepared projects. The current studies that explored risk matters include Pehlivan and Öztemir (2015, Katre, and Ghaitidak (2016 amongst others. However, there is absence of unanimity from these studies on risk factors in construction. Thus, this article was instigated in order to identify and classify risk factors that affect the chances of project success. The research methodology selected for this article comprised of peer-reviewed articles between the periods of 2007 to 2017. This approach involved a comprehensive scrutiny into scholarly articles to comprehend risks in construction projects. Following a conceptual analysis, eighty factors were identified and classified under the following; technical, construction, financial, socio-political, physical, organisational, and environmental and other risks. From these categories, political instability was, found to be the most influential risk factor in construction projects and this factor was classified within the socio-political category and this category has total of 11 factors. Finding suggests the need for further empirical study.

  6. Project risk management for development of non-utility power generators (NUGs)

    International Nuclear Information System (INIS)

    Lau, T.

    1990-01-01

    The growing Non-Utility Generation (NUG) industry has brought new opportunities and challenges for the insurance industry. There can be unique engineering and financial risks involved in the development of Non-Utility Power Generation projects. The use of new technologies to meet stringent environmental regulations and to improve project performance and efficiency presents new challenges to the project developers and designers. The lack of funding, resources and experience of some of these projects may create unusual risks that could result in failure or deficiency in the performance of the projects

  7. The Strategic Risk Management at Different Stages of Innovation Project

    Directory of Open Access Journals (Sweden)

    Pysmak Viktoriia O.

    2017-03-01

    Full Text Available This article considers the theoretical principles of the strategic risk management at every stage of innovation project. Relevance of the selected area of research has been substantiated in view of the necessity to provide the theoretical and practical foundations for the strategic risk management of innovation activity. Principles of management of innovation at a contemporary enterprise have been allocated. Analysis of such concepts as «risk», «innovation», «strategic management» was carried out. The concept of «innovation project» has been considered, its features and characteristics have been allocated. The basic tools of the strategic management of enterprise in current conditions have been described. The basic principles of the strategic risk management of innovation activity have been formulated. A scheme with allocating the stages of innovation activity and the risks involved has been elaborated, taking into consideration the factors of occurrence of risks. The main groups of management strategies have been allocated. The tasks facing the managerial board in the process of the strategic risk management at every stage of the innovation project have been formulated.

  8. Reducing risk and accelerating delivery of a neutron source for fusion materials research

    Energy Technology Data Exchange (ETDEWEB)

    Surrey, E., E-mail: Elizabeth.Surrey@ccfe.ac.uk [EURATOM/CCFE, Abingdon OX14 3DB (United Kingdom); Porton, M. [EURATOM/CCFE, Abingdon OX14 3DB (United Kingdom); Davenne, T.; Findlay, D.; Letchford, A.; Thomason, J. [STFC Rutherford Appleton Laboratory, Harwell OX11 0QX (United Kingdom); Roberts, S.G.; Marrow, J.; Seryi, A. [University of Oxford, Oxford OX1 3DP (United Kingdom); Connolly, B. [University of Birmingham, Edgbaston B15 2TT (United Kingdom); Owen, H. [University of Manchester, Manchester M13 9PL (United Kingdom)

    2014-04-15

    Highlights: • Proposed neutron source for fusion materials – FAFNIR – n(d,C) stripping source. • Near term technology, reduces risk compared with IFMIF, timely data production. • Technical, economic and programme needs assessed, compatible with EU Roadmap proposals. • Safety case impacts regulatory role for source, now mainly stakeholder insurance. - Abstract: The materials engineering database relevant to fusion irradiation is poorly populated and it has long been recognized that a fusion spectrum neutron source will be required, the facility IFMIF being the present proposal. Re-evaluation of the regulatory approach for the EU proposed DEMO device shows that the purpose of the source can be changed from lifetime equivalent irradiation exposure to data generation at lower levels of exposure by adopting a defence in depth strategy and regular component surveillance. This reduces the specification of the source with respect to IFMIF allowing lower risk technology solutions to be considered. A description of such a source, the Facility for Fusion Neutron Irradiation Research, FAFNIR, is presented here along with project timescales and costs.

  9. Achieving Conservation and Equity amidst Extreme Poverty and Climate Risk: The Makira REDD+ Project in Madagascar

    Directory of Open Access Journals (Sweden)

    Laura Brimont

    2015-03-01

    Full Text Available Achieving forest conservation together with poverty alleviation and equity is an unending challenge in the tropics. The Makira REDD+ pilot project located in northeastern Madagascar is a well-suited case to explore this challenge in conditions of extreme poverty and climatic vulnerability. We assessed the potential effect of project siting on the livelihoods of the local population and which households would be the most strongly impacted by conservation measures. Farmers living in hilly areas must resort to slash-and-burn agriculture (tavy since a combination of topographic and climatic constraints, such as cyclones, makes permanent rice cultivation very difficult. These are the people who suffer most from conservation-related restriction measures. For practical reasons the project, unfortunately, did not target these farmers. The main focus was on communities with a lower cyclonic risk that are able to practice permanent rice agriculture in the lowlands. To reduce deforestation without violating the principles of equity, REDD+ projects in Madagascar need to better target populations facing high climatic risks and invest in efforts to improve the farmers’ agricultural systems.

  10. Breast cancer after bilateral risk-reducing mastectomy

    DEFF Research Database (Denmark)

    Skytte, A-B; Crüger, Dorthe Gylling; Gerster, M

    2011-01-01

    This study aims to evaluate the incidence of breast cancer after risk-reducing mastectomy (RRM) in healthy BRCA mutation carriers. This study is a long-term follow-up of 307 BRCA mutation carriers of whom 96 chose RRM. None of the study participants had a previous history of breast or ovarian...... cancer nor had they undergone RRM or risk-reducing bilateral salpingo-oophorectomy (BSO) prior to the time of BRCA testing. The annual incidence of post-mastectomy breast cancer was 0.8% compared with 1.7% in the non-operated group. Implications of these findings in relation to genetic counseling...

  11. Using a Sound Field to Reduce the Risks of Bird-Strike: An Experimental Approach.

    Science.gov (United States)

    Swaddle, John P; Ingrassia, Nicole M

    2017-07-01

    Each year, billions of birds collide with large human-made structures, such as building, towers, and turbines, causing substantial mortality. Such bird-strike, which is projected to increase, poses risks to populations of birds and causes significant economic costs to many industries. Mitigation technologies have been deployed in an attempt to reduce bird-strike, but have been met with limited success. One reason for bird-strike may be that birds fail to pay adequate attention to the space directly in front of them when in level, cruising flight. A warning signal projected in front of a potential strike surface might attract visual attention and reduce the risks of collision. We tested this idea in captive zebra finches (Taeniopygia guttata) that were trained to fly down a long corridor and through an open wooden frame. Once birds were trained, they each experienced three treatments at unpredictable times and in a randomized order: a loud sound field projected immediately in front of the open wooden frame; a mist net (i.e., a benign strike surface) placed inside the wooden frame; and both the loud sound and the mist net. We found that birds slowed their flight approximately 20% more when the sound field was projected in front of the mist net compared with when the mist net was presented alone. This reduction in velocity would equate to a substantial reduction in the force of any collision. In addition to slowing down, birds increased the angle of attack of their body and tail, potentially allowing for more maneuverable flight. Concomitantly, the only cases where birds avoided the mist net occurred in the sound-augmented treatment. Interestingly, the sound field by itself did not demonstrably alter flight. Although our study was conducted in a limited setting, the alterations of flight associated with our sound field has implications for reducing bird-strike in nature and we encourage researchers to test our ideas in field trials. © The Author 2017. Published by

  12. Ontological Analysis of the Project Risk Management Concept ‘Risk’

    Directory of Open Access Journals (Sweden)

    Uzulāns Juris

    2018-02-01

    Full Text Available The aim of the current research series is to examine the definitions of the concept ‘risk’ and analyze the concepts used in the definitions of ‘risk’ in the sources of these definitions in order to perform the ontological analysis of the concept of ‘risk’. Ontological and epistemological analysis of the concepts in the definition of the concept ‘risk’ was used to answer the question what ‘risk’ means in project management. This investigation represents a part of the research series where the ontological, epistemological and methodological analysis of project risk is performed with the aim to improve risk registers and risk management as a whole. In the previous studies the author analyzed the concept of ‘event’ that defines the content of the concept ‘risk’. The use of ‘event’ was analyzed in different sources to find out how the concept should be used. The ontological, epistemological and methodological analysis of the definitions of the concept ‘risk’ is the theoretical foundation for risk register creation because it is possible to create complete and understandable register for the participants of the project risk management process. The author believes that the conducted research helps establish confidence that ontological analysis is the method that together with the epistemological and methodological analysis provides opportunity to perform analysis of risk management sources aimed at improving risk management. The results of the study cannot be considered sufficient for deriving valid conclusions about project risk management and developing recommendations for improving risk management with regard to the content of the risk register. For valid conclusions and recommendations, a deeper research is needed which, first of all, would analyze a larger number of sources.

  13. On reducibility and ergodicity of population projection matrix models

    DEFF Research Database (Denmark)

    Stott, Iain; Townley, Stuart; Carslake, David

    2010-01-01

    from all stages to all other stages) and therefore ergodic (whatever initial stage structure is used in the population projection, it will always exhibit the same stable asymptotic growth rate). 2. Evaluation of 652 PPM models for 171 species from the literature suggests that 24·7% of PPM models...... structure used in the population projection). In our sample of published PPMs, 15·6% are non-ergodic. 3. This presents a problem: reducible–ergodic models often defy biological rationale in their description of the life cycle but may or may not prove problematic for analysis as they often behave similarly...... of reducibility in published PPMs, with significant implications for the predictive power of such models in many cases. We suggest that as a general rule, reducibility of PPM models should be avoided. However, we provide a guide to the pertinent analysis of reducible matrix models, largely based upon whether...

  14. Multiobjective genetic algorithm approaches to project scheduling under risk

    OpenAIRE

    Kılıç, Murat; Kilic, Murat

    2003-01-01

    In this thesis, project scheduling under risk is chosen as the topic of research. Project scheduling under risk is defined as a biobjective decision problem and is formulated as a 0-1 integer mathematical programming model. In this biobjective formulation, one of the objectives is taken as the expected makespan minimization and the other is taken as the expected cost minimization. As the solution approach to this biobjective formulation genetic algorithm (GA) is chosen. After carefully invest...

  15. Risk assessment framework on time impact: Infrastructure projects in soft soil during construction stage

    Science.gov (United States)

    Low, W. W.; Wong, K. S.; Lee, J. L.

    2018-04-01

    With the growth of economy and population, there is an increase in infrastructure construction projects. As such, it is unavoidable to have construction projects on soft soil. Without proper risk management plan, construction projects are vulnerable to different types of risks which will have negative impact on project’s time, cost and quality. Literature review showed that little or none of the research is focused on the risk assessment on the infrastructure project in soft soil. Hence, the aim of this research is to propose a risk assessment framework in infrastructure projects in soft soil during the construction stage. This research was focused on the impact of risks on project time and internal risk factors. The research method was Analytical Hierarchy Process and the sample population was experienced industry experts who have experience in infrastructure projects. Analysis was completed and result showed that for internal factors, the five most significant risks on time element are lack of special equipment, potential contractual disputes and claims, shortage of skilled workers, delay/lack of materials supply, and insolvency of contractor/sub-contractor. Results indicated that resources risk factor play a critical role on project time frame in infrastructure projects in soft soil during the construction stage.

  16. A Hybrid MCDM Technique for Risk Management in Construction Projects

    Directory of Open Access Journals (Sweden)

    Kajal Chatterjee

    2018-02-01

    Full Text Available Multi-stakeholder based construction projects are subject to potential risk factors due to dynamic business environment and stakeholders’ lack of knowledge. When solving project management tasks, it is necessary to quantify the main risk indicators of the projects. Managing these requires suitable risk mitigation strategies to evaluate and analyse their severity. The existence of information asymmetry also causes difficulties with achieving Pareto efficiency. Hence, to ensure balanced satisfaction of all participants, risk evaluation of these projects can be considered as an important part of the multi-criteria decision-making (MCDM process. In real-life problems, evaluation of project risks is often uncertain and even incomplete, and the prevailing methodologies fail to handle such situations. To address the problem, this paper extends the analytical network process (ANP methodology in the D numbers domain to handle three types of ambiguous information’s, viz. complete, uncertain, and incomplete, and assesses the weight of risk criteria. The D numbers based approach overcomes the deficiencies of the exclusiveness hypothesis and completeness constraint of Dempster–Shafer (D–S theory. Here, preference ratings of the decision matrix for each decision-maker are determined using a D numbers extended consistent fuzzy preference relation (D-CFPR. An extended multi-attributive border approximation area comparison (MABAC method in D numbers is then developed to rank and select the best alternative risk response strategy. Finally, an illustrative example from construction sector is presented to check the feasibility of the proposed approach. For checking the reliability of alternative ranking, a comparative analysis is performed with different MCDM approaches in D numbers domain. Based on different criteria weights, a sensitivity analysis of obtained ranking of the hybrid D-ANP-MABAC model is performed to verify the robustness of the proposed

  17. Breastfeeding Reduces Childhood Obesity Risks.

    Science.gov (United States)

    Wang, Liang; Collins, Candice; Ratliff, Melanie; Xie, Bin; Wang, Youfa

    2017-06-01

    The present study examined the effects of breastfeeding and its duration on the development of childhood obesity from 24 months through grade 6. U.S. longitudinal data collected from 1234 children were analyzed using logistic regression models and generalized estimating equation (GEE). Child height and weight were measured six times at ages of 24 months, 36 months, 54 months, grade 1, grade 3, and grade 6. During the early 1990s, prevalence of breastfeeding was low in the United States, 60% and 48% at 1 and 6 months, respectively. Nonsmoking, white, married mothers with both parents in the household, and with income above the poverty line, were more likely to breastfeed at 1 month of age of their babies. Obesity rate of the children increased with age from 24 months to grade 6. Logistic regression showed that breastfeeding at month 1 was associated with 53% (odds ratio [OR]: 0.47, 95% confidence interval [CI]: 0.30-0.73) and 47% (OR: 0.53, 95% CI: 0.36-0.78) decreased risks for childhood obesity at grades 1 and 6, respectively. GEE analysis showed that breastfeeding at 1 month reduced risk for childhood obesity by 36% (95% CI: 0.47-0.88) from ages 24 months through grade 6. Regarding breastfeeding duration, more than 6 months (vs. never) was associated with a decreased risk for childhood obesity by 42% (OR: 0.58, 95% CI: 0.36-0.94). Breastfeeding at 1 month and more than 6 months reduced the risk of childhood obesity. Rate of breastfeeding was low in the United States in the 1990s, which may have had long-term implications on children.

  18. Risk Assessment in Financial Feasibility of Tanker Project Using Monte Carlo Simulation

    Directory of Open Access Journals (Sweden)

    Muhammad Badrus Zaman

    2017-09-01

    Full Text Available Every ship project would not be apart from risk and uncertainty issues. The inappropriate risk assessment process would have long-term impact, such as financial loss. Thus, risk and uncertainties analysis would be a very important process in financial feasibility determination of the project. This study analyzes the financial feasibility of 17,500 LTDW tanker project. Risk and uncertainty are two differentiated terminologies in this study, where risk focuses on operational risk due to shipbuilding process nonconformity to shipowner finance, while uncertainty focuses on variable costs that affect project cash flows. There are three funding scenarios in this study, where the percentage of funding with own capital and bank loan in scenario 1 is 100% : 0%, scenario 2 is 75% : 25%, and scenario 3 is 50% : 50%. Monte Carlo simulation method was applied to simulate the acceptance criteria, such as net present value (NPV, internal rate of return (IRR, payback period (PP, and profitability index (PI. The results of simulation show that 17,500 LTDW tanker project funding by scenario 1, 2 and 3 are feasible to run, where probability of each acceptance criteria was greater than 50%. Charter rate being the most sensitive uncertainty over project's financial feasibility parameters.

  19. Climate Change Risk Management: CRE Adaptation Projects and the Risk Management Process

    Science.gov (United States)

    This document describes National Estuary Program partner projects that demonstrate how risk management can be successfully applied to address environmental challenges in our country’s coastal areas.

  20. Managing Risk and Uncertainty in Large-Scale University Research Projects

    Science.gov (United States)

    Moore, Sharlissa; Shangraw, R. F., Jr.

    2011-01-01

    Both publicly and privately funded research projects managed by universities are growing in size and scope. Complex, large-scale projects (over $50 million) pose new management challenges and risks for universities. This paper explores the relationship between project success and a variety of factors in large-scale university projects. First, we…

  1. Risk management tools from the traditional energy industry to wind energy projects

    International Nuclear Information System (INIS)

    Randall, G.; Marks, R.

    2010-01-01

    Risk-based analysis techniques are used to quantify and prioritize a wide variety of problems within the traditional fossil fuel and nuclear power industries. This poster presentation evaluated some of the risk analysis tools and methods used by the energy industry to quantify and manage wind energy development risks. A comprehensive risk-based approach for identifying the probability and consequences of potential concerns was presented for a sample wind energy project. The process determined objectives in relation to the project's net present value. Contributing domains included the energy production, prices, and operating costs of the project. Decision criteria used to evaluate the desirability of the wind project were then developed. Monte Carlo simulations were the used to aggregate individual risks into an overall total. The contribution of each element to the decision objective was calculated separately. The element outputs were than combined into a measure of aggregate risk exposure. Aggregate results were used to calculate the decision criteria. The decision objective was to determine if the energy cost was less than the avoided cost of other project options. The study showed that the approach can allow decision-makers to mitigate risks. However, the results are dependent on the quality of the input data. tabs., figs.

  2. The analysis of financial risk management application for NPP project in Indonesia

    International Nuclear Information System (INIS)

    Imam Bastori; Moch Djoko Birmano

    2012-01-01

    NPP Project is one of full dynamic, risky and challenging business. Application of financial risk management t in Nuclear Power Plant (NPP) project becomes one alternative to be considered carefully. This paper explains an analysis to make a decision in the risk management application so that it can be applied in the NPP's construction in Indonesia. As case study, is NPP of conventional PWR type of class 1150 MWe. To calculate the economics and financing of NPP is used Spreadsheet INOVASI, further the decision of financial risk management were analyzed using a Model of Cash Flow Adjustment, which developed by Richard Fairchild. The analysis showed that the Method of Cash Flow Adjustment developed by Richard Fairchild is better than the method of NPV Adjustment on a NPP project, because it have included the aspects of financial risk management. NPP project can only be executed if the NPV 2 0 and decision to execute the financial risk management should be based on NPVrm > NPV. The application of financial risk management in NPP project is not needed if an insurance premium more expensive than all costs of financial distress, unless the insurance company can give discount of at least 20%. (author)

  3. Projection of radiation-induced cancer risks across time and populations

    International Nuclear Information System (INIS)

    Muirhead, C.R.

    1991-01-01

    Various methods can be used to project the risks of radiation-induced cancer estimated in cohort studies beyond the period of follow-up and to other populations. The choice of risk projection model is reviewed based on data from studies such as those of the Japanese atomic bomb survivors and UK ankylosing spondylitis patients given X ray therapy. Risk estimates applicable to a UK population are calculated on the basis of various models, including those developed by the BEIR V Committee. It is emphasised that the continued follow-up of populations such as the Japanese atomic bomb survivors is of great importance in estimating lifetime risks. (author)

  4. Risk Evaluation on UHV Power Transmission Construction Project Based on AHP and FCE Method

    OpenAIRE

    Huiru Zhao; Sen Guo

    2014-01-01

    Ultra high voltage (UHV) power transmission construction project is a high-tech power grid construction project which faces many risks and uncertainty. Identifying the risk of UHV power transmission construction project can help mitigate the risk loss and promote the smooth construction. The risk evaluation on “Zhejiang-Fuzhou” UHV power transmission construction project was performed based on analytic hierarchy process (AHP) and fuzzy comprehensive evaluation (FCE) method in this paper. Afte...

  5. Replacement of HEPA Filters at the LANL CMR Facility: Risks Reduced by Comprehensive Waste Characterization

    International Nuclear Information System (INIS)

    Corpion, J.; Barr, A.; Martinez, P.; Bader, M.

    2002-01-01

    In March 2001, the Los Alamos National Laboratory (LANL) completed the replacement of 720 radioactively contaminated HEPA filters for $5.7M. This project was completed five months ahead of schedule and $6.0M under budget with no worker injuries or contaminations. Numerous health and safety, environmental, and waste disposal problems were overcome, including having to perform work in a radioactively contaminated work environment, that was also contaminated with perchlorates (potential explosive). High waste disposal costs were also an issue. A project risk analysis and government cost estimate determined that the cost of performing the work would be $11.8M. To reduce risk, a $1.2M comprehensive condition assessment was performed to determine the degree of toxic and radioactive contamination trapped on the HEPA filters; and to determine whether explosive concentrations of perchlorates were present. Workers from LANL and personnel from Waldheim International of Knoxville, TN collected hundreds of samples wearing personnel protective gear against radioactive, toxic, and explosive hazards. LANL also funded research at the New Mexico Institute of Mining and Technology to determine the explosivity of perchlorates. The data acquired from the condition assessment showed that toxic metals, toxic organic compounds, and explosive concentrations of perchlorates were absent. The data also showed that the extent of actinide metal contamination was less than expected, reducing the potential of transuranic waste generation by 50%. Consequently, $4.2M in cost savings and $1.8M in risk reduction were realized by increased worker productivity and waste segregation

  6. Planning risk communication for UMTRA project groundwater restoration

    Energy Technology Data Exchange (ETDEWEB)

    Hundertmark, Charles [Jacobs Engineering Group Inc. and University of Phoenix (United States); Hoopes, Jack [Jacobs Engineering Group Inc. (United States); Flowers, Len [Roy F. Weston Company (United States); Jackson, David G [U.S. Department of Energy (United States)

    1992-07-01

    The U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is entering a new phase in which groundwater contamination will become a growing focus as surface remedial action draws toward completion. Planning for risk communication associated with the groundwater project will be a major factor in the successful initiation of the program. (author)

  7. Planning risk communication for UMTRA project groundwater restoration

    International Nuclear Information System (INIS)

    Hundertmark, Charles; Hoopes, Jack; Flowers, Len; Jackson, David G.

    1992-01-01

    The U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is entering a new phase in which groundwater contamination will become a growing focus as surface remedial action draws toward completion. Planning for risk communication associated with the groundwater project will be a major factor in the successful initiation of the program. (author)

  8. Risk management of the North Anna Power Station Service Water System Preservation Project using the IPE model

    International Nuclear Information System (INIS)

    Afzali, A.; Donovan, M.D.; Sartain, M.D.; Bankley, A.V.

    1993-01-01

    This paper discusses the application of the North Anna Power Station Individual Plant Examination (IPE) models in PRA study of the Service Water System Preservation Project (SWSPP). The service water project involves repair and restoration of the Service Water System (SWS) piping and will require excavation of the buried SWS lines in addition to temporarily removing one of the two redundant SWS loops from operation. The SWSPP will be carried out with one or both units in normal operation. The objective of the PRA study was to quantify the risk impact (as measured by the change in Core Damage Frequency (ΔCDF)) of the SWSPP and to identify and evaluate countermeasures to reduce the risk impact of the project activities. The study concluded that the ΔCDF would be acceptable by undertaking preventative measures and by providing additional accident mitigating measures during performance of the SWSPP activities

  9. Risk assessment of underpass infrastructure project based on IS0 31000 and ISO 21500 using fishbone diagram and RFMEA (project risk failure mode and effects analysis) method

    Science.gov (United States)

    Purwanggono, Bambang; Margarette, Anastasia

    2017-12-01

    Completion time of highway construction is very meaningful for smooth transportation, moreover expected number of ownership motor vehicle will increase each year. Therefore, this study was conducted with to analyze the constraints that contained in an infrastructure development project. This research was conducted on Jatingaleh Underpass Project, Semarang. This research was carried out while the project is running, on the implementation, this project is experiencing delays. This research is done to find out what are the constraints that occur in execution of a road infrastructure project, in particular that causes delays. The method that used to find the root cause is fishbone diagram to obtain a possible means of mitigation. Coupled with the RFMEA method used to determine the critical risks that must be addressed immediately on road infrastructure project. The result of data tabulation in this study indicates that the most possible mitigation tool to make a Standard Operating Procedure (SOP) recommendations to disrupt utilities that interfere project implementation. Process of risk assessment has been carried out systematically based on ISO 31000:2009 on risk management and for determination of delayed variables, the requirements of process groups according to ISO 21500:2013 on project management were used.

  10. Reducing cardiovascular risk : protecting the kidney

    NARCIS (Netherlands)

    Dobre, Daniela; Lambers Heerspink, Hiddo J.; de Zeeuw, Dick

    2009-01-01

    Progressive decline of renal function in chronic kidney disease (CKD), measured by a reduced glomerular filtration rate or albuminuria, is linked to an increased risk of cardiovascular (CV) disease. Angiotensin-converting enzyme (ACE) inhibitors and angiotensin II receptor blockers (ARBs), most

  11. Maternal risk factors for abnormal placental growth: The national collaborative perinatal project

    Directory of Open Access Journals (Sweden)

    Nicholson Wanda K

    2008-09-01

    Full Text Available Abstract Background Previous studies of maternal risk factors for abnormal placental growth have focused on placental weight and placental ratio as measures of placental growth. We sought to identify maternal risk factors for placental weight and two neglected dimensions of placental growth: placental thickness and chorionic plate area. Methods We conducted an analysis of 24,135 mother-placenta pairs enrolled in the National Collaborative Perinatal Project, a prospective cohort study of pregnancy and child health. We defined growth restriction as th percentile and hypertrophy as > 90th percentile for three placental growth dimensions: placental weight, placental thickness and chorionic plate area. We constructed parallel multinomial logistic regression analyses to identify (a predictors of restricted growth (vs. normal and (b predictors of hypertrophic growth (vs. normal. Results Black race was associated with an increased likelihood of growth restriction for placental weight, thickness and chorionic plate area, but was associated with a reduced likelihood of hypertrophy for these three placental growth dimensions. We observed an increased likelihood of growth restriction for placental weight and chorionic plate area among mothers with hypertensive disease at 24 weeks or beyond. Anemia was associated with a reduced likelihood of growth restriction for placental weight and chorionic plate area. Pre-pregnancy BMI and pregnancy weight gain were associated with a reduced likelihood of growth restriction and an increased likelihood of hypertrophy for all three dimensions of placental growth. Conclusion Maternal risk factors are either associated with placental growth restriction or placental hypertrophy not both. Our findings suggest that the placenta may have compensatory responses to certain maternal risk factors suggesting different underlying biological mechanisms.

  12. Managing Pre-Construction and Construction Risks on Project Sites in Abuja-Nigeria

    Directory of Open Access Journals (Sweden)

    Jimoh R.A.

    2016-03-01

    Full Text Available Managing risks in construction projects has been acknowledged as a key direction process for the purposes of attaining the project goal in terms of time, cost, quality, safety, and environmental sustainability. Hence, the paper evaluated pre-construction and construction risks on active project sites in Abuja-Nigeria. This was achieved using survey method through the self-administration of 35 questionnaires to the professionals handling the 35 identified projects being undertaking at that time. Results showed that errors and omissions in design and improperly defined project scope had mean score values of 3.03 and 2.54, respectively, were the construction risks most experienced by the professionals during pre-construction. On the other hand, fluctuation in market prices and delays with mean score values of 3.14 and 2.74, respectively, were the construction risks experienced by the professionals during the construction phase of the projects. It is recommended that procurement methods such as construction management should be adopted and stakeholders should keep to their own side of the bargain to avoid unnecessary delays.

  13. A Quantitative Measure For Evaluating Project Uncertainty Under Variation And Risk Effects

    Directory of Open Access Journals (Sweden)

    A. Chenarani

    2017-10-01

    Full Text Available The effects of uncertainty on a project and the risk event as the consequence of uncertainty are analyzed. The uncertainty index is proposed as a quantitative measure for evaluating the uncertainty of a project. This is done by employing entropy as the indicator of system disorder and lack of information. By employing this index, the uncertainty of each activity and its increase due to risk effects as well as project uncertainty changes as a function of time can be assessed. The results are implemented and analyzed for a small turbojet engine development project as the case study. The results of this study can be useful for project managers and other stakeholders for selecting the most effective risk management and uncertainty controlling method.

  14. RISK ASSESSMENT IN PROJECT PLANNING USING FMEA AND CRITICAL PATH METHOD

    Directory of Open Access Journals (Sweden)

    Sandra Milena CHOLES ARVILLA

    2014-10-01

    Full Text Available This paper is based upon the research undertaken for the development of the doctoral thesis “Management of software projects based on object-oriented technology”. The study examines the existing risk management practices commonly used for classic software development. The goal is to integrate the elements of the traditional risk management methodologies to create a new agile risk management methodology. The thesis focuses on techniques that can be easily implemented in extreme programming (XP and SCRUM. This study is motivated by the following research questions: What are the elements of existing quality assurance tools that could meet the principles of agile development? And is it possible to use risk estimation for improving quality in agile projects? The thesis presents a synthesis of the most common risk management techniques, as well as an introduction to agile methods XP and SCRUM. The proposal integrates the concepts of Failure Mode and Effect Analysis into the iterative life cycle of an agile software project. The thesis presents a metamodel which integrates the concepts of agile development methodologies: SCRUM and XP with the FMEA concepts for risk quantification. The model was partly implemented into a real development project. Partial results show the improvement in early identification of failures and allowed to reconsider the Sprint plan.

  15. Risk management integration into complex project organizations

    Science.gov (United States)

    Fisher, K.; Greanias, G.; Rose, J.; Dumas, R.

    2002-01-01

    This paper describes the approach used in designing and adapting the SIRTF prototype, discusses some of the lessons learned in developing the SIRTF prototype, and explains the adaptability of the risk management database to varying levels project complexity.

  16. Evaluation Of The Risk Of Financing Projects Of Environmental Protection

    Directory of Open Access Journals (Sweden)

    Gabriela Cornelia PICIU

    2012-03-01

    Full Text Available The research project approaches multidimensionally the financing of environmental protection from the perspective of directing, correlating and consolidating the financial flows circumscribed to the regeneration of an economy affected by environmental deterioration due to the very activities defining the economic mechanisms and circuits. The purpose of the project is to identify, by scientific, methodological and empirical analysis of the concepts, principles and arguments imposed by the economic theory, the risks of financing the projects of environmental projects and to evaluate their effects because their neglecting, individual approach or erroneous dimensioning might have unfavourable and unforeseen consequences in terms of the efficiency of the environmental strategies and policies. The objective of the study is the reveal the interdependency and interaction between the flows and circuits financing the environmental projects, showing the necessity for punctual, distributive, correlative and multiplicative financing of the environmental protection. This must be done from an expanded and prospective spatial and temporal vision by a compositional approach of the risk for environmental investments within the complex network of the social, economic and financial risks generated by the global system of the human praxis focused on the binomial of the human-environment interdependence.

  17. Perceived risks in product innovation projects : development of a risk skeleton

    NARCIS (Netherlands)

    Halman, J.I.M.; Keizer, J.A.; Song, X.M.

    1999-01-01

    The essence of undertaking a product innovation project is to create or establish something new. Risk taking is an intrinsic part of that process. In today's markets, with heavy competition, advanced technology and tough economic conditions, successful product innovation has become critically

  18. Transport project evaluation: feasibility risk assessment and scenario forecasting

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    2017-01-01

    This paper presents a new approach to transport project assessment in terms of feasibility risk assessment and reference class forecasting. Conventionally, transport project assessment is based upon a Cost-Benefit Analysis (CBA) where evaluation criteria such as Benefit Cost Ratios (BCR...... on the preliminary construction cost estimates. Hereafter, a quantitative risk analysis is provided making use of Monte Carlo simulation. This approach facilitates random input parameters based upon reference class forecasting, hence, a parameter data fit has been performed in order to obtain validated probability...... Scenario Forecasting (RSF) frame. The RSF is anchored in the cost-benefit analysis; thus, it provides decision-makers with a quantitative mean of assessing the transport infrastructure project. First, the RSF method introduces uncertainties within the CBA by applying Optimism Bias uplifts...

  19. Risk Consideration and Cost Estimation in Construction Projects Using Monte Carlo Simulation

    Directory of Open Access Journals (Sweden)

    Claudius A. Peleskei

    2015-06-01

    Full Text Available Construction projects usually involve high investments. It is, therefore, a risky adventure for companies as actual costs of construction projects nearly always exceed the planed scenario. This is due to the various risks and the large uncertainty existing within this industry. Determination and quantification of risks and their impact on project costs within the construction industry is described to be one of the most difficult areas. This paper analyses how the cost of construction projects can be estimated using Monte Carlo Simulation. It investigates if the different cost elements in a construction project follow a specific probability distribution. The research examines the effect of correlation between different project costs on the result of the Monte Carlo Simulation. The paper finds out that Monte Carlo Simulation can be a helpful tool for risk managers and can be used for cost estimation of construction projects. The research has shown that cost distributions are positively skewed and cost elements seem to have some interdependent relationships.

  20. The VeTOOLS Project: an example of how to strengthen collaboration between scientists and Civil Protections in disaster risk reduction

    Science.gov (United States)

    Marti, Joan; Bartolini, Stefania; Becerril, Laura

    2016-04-01

    VeTOOLS is a project funded by the European Commission's Humanitarian Aid and Civil Protection department (ECHO), and aims at creating an integrated software platform specially designed to assess and manage volcanic risk. The project facilitates interaction and cooperation between scientists and Civil Protection Agencies in order to share, unify, and exchange procedures, methodologies and technologies to effectively reduce the impacts of volcanic disasters. The project aims at 1) improving and developing volcanic risk assessment and management capacities in active volcanic regions; 2) developing universal methodologies, scenario definitions, response strategies and alert protocols to cope with the full range of volcanic threats; 4) improving quantitative methods and tools for vulnerability and risk assessment; and 5) defining thresholds and protocols for civil protection. With these objectives, the VeTOOLS project points to two of the Sendai Framework resolutions for implementing it: i) Provide guidance on methodologies and standards for risk assessments, disaster risk modelling and the use of data; ii) Promote and support the availability and application of science and technology to decision-making, and offers a good example on how a close collaboration between science and civil protection is an effective way to contribute to DRR. European Commission ECHO Grant SI2.695524

  1. Risks Associated with Unconventional Gas Extraction Projects. Induced Seismicity, NORM and Ecological Risks

    International Nuclear Information System (INIS)

    Rodrigo-Naharro, J.; Hurtado, A.; Eguilior, S.; Recreo, F.

    2015-01-01

    The latest technological advances in hydraulic fracturing (fracking) and horizontal drilling are globally driving the commercial extraction of unconventional resources. Although there is still no commercial exploitation of these resources within the EU, the fact that there are potential reserves in some countries, such as Spain, stimulates the need of performing preliminary studies to define the characteristics that an unconventional gas extraction project should consider. The object of these features are the safety of the project, thus minimizing the probabilities of negative environmental impacts, and especially since there is not any EU Framework Directive focusing on the regulation of the operation of such fossil fuels. A project of this nature, involving natural systems, must start from the knowledge of these systems and from an assessment of its features in order to reach the environmental safety of the operations. Moreover, the implementation of risk management systems, along with the existence of an appropriate legislation and supervision are key elements in the development of unconventional gas extraction projects that are environmentally friendly. The present report includes, among the overall risks associated with such projects, those related to: i) the induced seismicity; ii) the Naturally-Occurring Radioactive Materials (NORM); and iii) the ecology.

  2. Business risks, functions, methods of assessment and ways to reduce risk

    Directory of Open Access Journals (Sweden)

    A.V. Mihalchuk

    2015-06-01

    Full Text Available For successful existence in a market economy entrepreneur have to take bold actions, and this increases the risk. The article describes the concept of entrepreneurship and business risk, positive and negative aspects of functions of risk in business. Therefore, it is necessary to assess the risk properly and be able to manage it to achieve the most effective results in the market. In market conditions the problem of assessing and accounting market becomes independent theoretical and practical significance as an important component of the theory and practice of management. Risk - a key element of business activities. Development of risk situations can lead to both the occurrence of adverse effects (losses, lost profits, and positive results for a company in the form of increased profit. This article describes: the concept of entrepreneurship, risk and business risks, characteristic of positive and negative aspects of risk functions in business, methods of assessment and risk reduction, shows formulae and examples you can use to assess risk in an enterprise. Analyzing already established methods of risk assessment a number of rules were proposed in order to reduce business risk.

  3. RISK MANAGEMENT AUTOMATION OF SOFTWARE PROJECTS BASED ОN FUZZY INFERENCE

    Directory of Open Access Journals (Sweden)

    T. M. Zubkova

    2015-09-01

    Full Text Available Application suitability for one of the intelligent methods for risk management of software projects has been shown based on the review of existing algorithms for fuzzy inference in the field of applied problems. Information sources in the management of software projects are analyzed; major and minor risks are highlighted. The most critical parameters have been singled out giving the possibility to estimate the occurrence of an adverse situations (project duration, the frequency of customer’s requirements changing, work deadlines, experience of developers’ participation in such projects and others.. The method of qualitative fuzzy description based on fuzzy logic has been developed for analysis of these parameters. Evaluation of possible situations and knowledge base formation rely on a survey of experts. The main limitations of existing automated systems have been identified in relation to their applicability to risk management in the software design. Theoretical research set the stage for software system that makes it possible to automate the risk management process for software projects. The developed software system automates the process of fuzzy inference in the following stages: rule base formation of the fuzzy inference systems, fuzzification of input variables, aggregation of sub-conditions, activation and accumulation of conclusions for fuzzy production rules, variables defuzzification. The result of risk management automation process in the software design is their quantitative and qualitative assessment and expert advice for their minimization. Practical significance of the work lies in the fact that implementation of the developed automated system gives the possibility for performance improvement of software projects.

  4. Cost control and risk mitigation of major projects

    International Nuclear Information System (INIS)

    Caddy, D.G.

    1993-01-01

    In this paper and presentation, the four major types of estimates will be discussed, i.e., capacity factored, equipment factored, semi-detailed and detailed. Key relationships between particular portions of estimates will be discussed such as the relationship between direct field labor and indirect field costs. Having set the basis for developing a project's cost through estimating, the paper will then list and discuss the fifteen key steps which must be followed to control the costs of a project. Next, the subject of allowances and contingency will be discussed and defined and the differences between the two will be highlighted. Having established exactly what contingency is, the subject of risk analysis through RANGE estimating will be discussed. The methods used to establish a precise contingency and probability of an over/under run will be discussed. Finally, the paper will discuss the methods by which a project manager, owner or contractor can mitigate risks; that is to eliminate, transfer or minimize their effect

  5. The Fee Sensitive Risk Exposures of Project Authorized Person in Hong Kong

    Directory of Open Access Journals (Sweden)

    Sai-On Cheung

    2012-11-01

    Full Text Available Authorized Persons (AP play a critical role in the design and construction of building works in Hong Kong. Under the Building Ordinance, design and construction of building works need to be coordinated and monitored by an AP registered with the Buildings Department. Professionally qualified Architects, Engineers and Surveyors are eligible to register as AP after completing the prescribed assessment. In addition, the project AP is often appointed by the project owner to be the project team leader. In these capacities, a project AP is exposed to various risks. This paper seeks to identify the fee sensitive risk exposures of project APs. Through an ANOVA study, these risks exposures are those due to liabilities under the Building Ordinance at the construction stage, those towards the third parties and the clients.

  6. Risk Management Plan for Tank Farm Restoration and Safe Operations, Project W-314

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    The Risk Management Plan for Project W-314 describes the systems, processes and procedures for implementation of applicable risk management practices described in HNF-0842, Volume IV, Section 2.6, ''Risk Management''. This plan is tailored specifically for use by Project W-314

  7. Periodontal disease with treatment reduces subsequent cancer risks.

    Science.gov (United States)

    Hwang, Ing-Ming; Sun, Li-Min; Lin, Cheng-Li; Lee, Chun-Feng; Kao, Chia-Hung

    2014-10-01

    The aim of our study was to evaluate the relationship between routine treatment of periodontal disease (PD) and the subsequent risks for cancers in Taiwan. Study participants were selected from the Taiwan National Health Insurance (NHI) system database. The PD with a routine treatment cohort contained 38 902 patients. For each treatment cohort participant, two age- and sex-matched comparison (control) cohort participants were randomly selected. Cox's proportional hazards regression analysis was used to estimate the effects of PD with treatment on the subsequent risk of cancer. The overall risk of developing cancer was significantly lower in the treatment cohort than in the patients without treatment (adjusted Hazard ratio = 0.72, 95% confidence interval = 0.68-0.76). The risks of developing most gastrointestinal tract, lung, gynecological and brain malignancies were significantly lower in the treatment cohort than in the comparison cohort. In contrast, the risks of prostate and thyroid cancers were significantly higher in the treatment cohort than in the comparison cohort. Our findings suggest that PD with treatment is associated with a significantly reduced overall risk of cancer and reduced risks of certain types of cancers. © The Author 2014. Published by Oxford University Press on behalf of the Association of Physicians. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  8. Decision Model on Financing a Project Using Knowledge about Risk Areas

    OpenAIRE

    Ioana POPOVICI; Emil SCARLAT; Francesco RIZZO

    2011-01-01

    The research presents an alternative to the classical method of measuring financial risk in funding a project. The goal of the model described in the paper implies identifying "risky areas" within the financial balance of the project. The model analysis the financial risk behavior studied along four scenarios by varying only the cost of financing source used according to the specific type of funding. The model introduces the time factor into the analysis of financial risk due to the specific ...

  9. The efficiency of asset management strategies to reduce urban flood risk.

    Science.gov (United States)

    ten Veldhuis, J A E; Clemens, F H L R

    2011-01-01

    In this study, three asset management strategies were compared with respect to their efficiency to reduce flood risk. Data from call centres at two municipalities were used to quantify urban flood risks associated with three causes of urban flooding: gully pot blockage, sewer pipe blockage and sewer overloading. The efficiency of three flood reduction strategies was assessed based on their effect on the causes contributing to flood risk. The sensitivity of the results to uncertainty in the data source, citizens' calls, was analysed through incorporation of uncertainty ranges taken from customer complaint literature. Based on the available data it could be shown that increasing gully pot blockage is the most efficient action to reduce flood risk, given data uncertainty. If differences between cause incidences are large, as in the presented case study, call data are sufficient to decide how flood risk can be most efficiently reduced. According to the results of this analysis, enlargement of sewer pipes is not an efficient strategy to reduce flood risk, because flood risk associated with sewer overloading is small compared to other failure mechanisms.

  10. Identification and assessment of risk factors affecting construction projects

    Directory of Open Access Journals (Sweden)

    Mohamed Sayed Bassiony Ahmed Abd El-Karim

    2017-08-01

    Unexpected increase in cost and delays in construction projects are caused by owner, contractor, environments, etc. in which several types of risk factors may occur concurrently. The effect of cost overrun and schedule overrun do not only influence the construction industry but the overall economy as well. Even though construction project increasing in cost and schedule has received extensive attention of researchers, but because of continuous changes and development in the field, the study considered of added value to the construction industry in Egypt, in addition to risk strategy and plan analysis. In order to meet the deadline of a project and due to the complex nature of construction projects, cost and scheduling should be flexible enough to accommodate changes without negatively affecting the overall project cost and duration. As such, the objectives of the presented research in this paper are to identify, study, and assess the effect of the factors that affect cost and time contingency. Data are collected from sixteen construction companies in Egypt. The collected data, output charts and analyses spreadsheets will be used for the development of computerized model built by the authors with identification abbreviation RIAM.

  11. Evaluating Sources of Risks in Large Engineering Projects: The Roles of Equivocality and Uncertainty

    Directory of Open Access Journals (Sweden)

    Leena Pekkinen

    2015-11-01

    Full Text Available Contemporary project risk management literature introduces uncertainty, i.e., the lack of information, as a fundamental basis of project risks. In this study the authors assert that equivocality, i.e., the existence of multiple and conflicting interpretations, can also serve as a basis of risks. With an in-depth empirical investigation of a large complex engineering project the authors identified risk sources having their bases in the situations where uncertainty or equivocality was the predominant attribute. The information processing theory proposes different managerial practices for risk management based on the sources of risks in uncertainty or equivocality.

  12. Two Stage Fuzzy Methodology to Evaluate the Credit Risks of Investment Projects

    OpenAIRE

    O. Badagadze; G. Sirbiladze; I. Khutsishvili

    2014-01-01

    The work proposes a decision support methodology for the credit risk minimization in selection of investment projects. The methodology provides two stages of projects’ evaluation. Preliminary selection of projects with minor credit risks is made using the Expertons Method. The second stage makes ranking of chosen projects using the Possibilistic Discrimination Analysis Method. The latter is a new modification of a well-known Method of Fuzzy Discrimination Analysis.

  13. Risks and opportunities management on laser Megajoule project: the development of a new knowledge

    International Nuclear Information System (INIS)

    Delafosse-Le Ber, H.; Deysson, St.; Briault, S.

    2004-01-01

    The interest of these six years spent to build the management through the Risks and the Opportunities (R and O) approach on the project Megajoule Laser as well did not hold with the practical application of a method as to the installation of a formal culture and to its evolution in time. This culture, it had to be progressively founded within a mainly technical project team. More qualitative with most quantitative aspects, the putting into practice of the R and O approach on project LMJ knew all the degrees of evolution and precision. The starting of the project saw being born the first analysis of its 'Project Risk' with a series of interviews, carried out by the Quality Manager at the time. This analysis took the shape of a technical item lists, which are identified in an empirical way. Then, some brainstorming meeting were led under the responsibility of the Technical Coordinator (which is the Project Manager assistant) in order to identify and to evaluate the 'Project Risk' on a qualitative way, but always keeping a strong technical connotation. The methodological reference of the 'Project Risk' was outlined taking into account the DGA AQ 923 without directly interaction with the other project processes (for example, the cost, the deadlines and the performance management). Initially, the project developed an Access database, which allows the storing of the risk files. Unfortunately, this database is isolated from the other project management data processing tools. In the second time, the project decided to obtain a dedicated organisation, hierarchically independent from the technical managers but however integrated into the project and attached to the assistant of the Control Project Manager. This organisation being called 'Risks and Opportunities Team', when the management of the opportunities supplemented the R and O approach. This team combines today the individual interviews and the Working Groups in order to identify and to evaluate the effects of the R

  14. Implementing local projects to reduce the stigma of mental illness.

    Science.gov (United States)

    Warner, Richard

    2008-01-01

    This editorial describes strategies used and the lessons learned in implementing two local anti-stigma projects. The WPA Programme to Reduce Stigma and Discrimination Because of Schizophrenia established projects to fight stigma in 20 countries, using social-marketing techniques to enhance their effectiveness. First steps at each site were to establish an action committee and conduct a survey of perceived stigma. Based on survey results, the action committees selected a few homogeneous and accessible target groups, such as employers, and criminal justice personnel. Messages and media were selected, tested, and refined. Guidelines are provided for setting up a consumer (service-user) speakers' bureau and for establishing a media-watch organization, which can lobby news and entertainment media to exclude negative portrayals of people with mental illness. Improvements in knowledge about mental illness were effected in high school students and criminal justice personnel. Positive changes in attitude towards people with mental illness were achieved with high school students, but were more difficult to achieve with police officers. Local antistigma projects can be effective in reducing stigma and relatively inexpensive. The involvement of consumers is important in working with police officers. Project organizers should be on the lookout for useful changes that can become permanent.

  15. Relationships Between Risks in an IT Project Development Portfolio

    NARCIS (Netherlands)

    Kusters, R.J.; Postema, J.J.; Trienekens, J.J.M.; Lavazza, L.; Oberhauser, R.; Martin, A.; Hassine, J.; Gebhart, M.; Jäntti, M.

    2013-01-01

    More and more it is seen that IT (Information Technology) projects are managed as a whole as part of a IT project portfolio. As one of the arguments for doing so, risk management at the portfolio level was identified as one of the advantages that could benefit from this. This was based on the notion

  16. Risk-reducing mastectomy for the prevention of primary breast cancer.

    Science.gov (United States)

    Carbine, Nora E; Lostumbo, Liz; Wallace, Judi; Ko, Henry

    2018-04-05

    Recent progress in understanding the genetic basis of breast cancer and widely publicized reports of celebrities undergoing risk-reducing mastectomy (RRM) have increased interest in RRM as a method of preventing breast cancer. This is an update of a Cochrane Review first published in 2004 and previously updated in 2006 and 2010. (i) To determine whether risk-reducing mastectomy reduces death rates from any cause in women who have never had breast cancer and in women who have a history of breast cancer in one breast, and (ii) to examine the effect of risk-reducing mastectomy on other endpoints, including breast cancer incidence, breast cancer mortality, disease-free survival, physical morbidity, and psychosocial outcomes. For this Review update, we searched Cochrane Breast Cancer's Specialized Register, MEDLINE, Embase and the WHO International Clinical Trials Registry Platform (ICTRP) on 9 July 2016. We included studies in English. Participants included women at risk for breast cancer in at least one breast. Interventions included all types of mastectomy performed for the purpose of preventing breast cancer. At least two review authors independently abstracted data from each report. We summarized data descriptively; quantitative meta-analysis was not feasible due to heterogeneity of study designs and insufficient reporting. We analyzed data separately for bilateral risk-reducing mastectomy (BRRM) and contralateral risk-reducing mastectomy (CRRM). Four review authors assessed the methodological quality to determine whether or not the methods used sufficiently minimized selection bias, performance bias, detection bias, and attrition bias. All 61 included studies were observational studies with some methodological limitations; randomized trials were absent. The studies presented data on 15,077 women with a wide range of risk factors for breast cancer, who underwent RRM.Twenty-one BRRM studies looking at the incidence of breast cancer or disease-specific mortality, or

  17. MANAGEMENT OF TRANSURANIC (TRU) WASTE RETRIEVAL PROJECT RISKS SUCCESSES IN THE STARTUP OF THE HANFORD 200 AREA TRU WASTE RETRIEVAL PROJECT

    International Nuclear Information System (INIS)

    GREENWLL, R.D.

    2005-01-01

    A risk identification and mitigation method applied to the Transuranic (TRU) Waste Retrieval Project performed at the Hanford 200 Area burial grounds is described. Retrieval operations are analyzed using process flow diagramming. and the anticipated project contingencies are included in the Authorization Basis and operational plans. Examples of uncertainties assessed include degraded container integrity, bulged drums, unknown containers, and releases to the environment. Identification and mitigation of project risks contributed to the safe retrieval of over 1700 cubic meters of waste without significant work stoppage and below the targeted cost per cubic meter retrieved. This paper will be of interest to managers, project engineers, regulators, and others who are responsible for successful performance of waste retrieval and other projects with high safety and performance risks

  18. Risk Management Affecting IS/IT Project Success Through Communicative Action

    NARCIS (Netherlands)

    de Bakker, K.F.C.; Boonstra, A.; Wortmann, J.C.

    Project risk management is defined in the literature as being instrumental action based on rational problem solving. Research indicates limited positive effects of an exclusive focus of instrumental action on project success. This article proposes to extend this instrumental view through

  19. [Strategies for reducing risks in smoking: opportunity or threat].

    Science.gov (United States)

    Córdoba, Rodrigo; Nerín, Isabel

    2009-12-01

    The smoking control policies recommended by the World Health Organisation have achieved a slight decrease in smoking prevalence in the developed countries, although associated mortality is still very high. The use of tobacco products other than cigarettes and even medicinal nicotine (known as nicotine replacement therapy (NRT)) has been proposed as a risk reduction strategy. Among the tobacco products with less individual risk than cigarettes would be any type of tobacco without smoke (smokeless) with a low content in nitrosamines and modified cigarettes; both forms included under the PREP (Potentially Reduced Exposure Products) concept. The idea would be to promote these products among those who cannot quit smoking or wish to reduce their risk without giving up nicotine intake. The possible effects of risk reduction strategies, including PREP, on the decreased prevalence and morbidity and mortality are reviewed, and the possible implications that this measure could have in our country are analysed. Tobacco control measures in Spain are recent and still insufficient. Therefore, the current priority in Spain is the development of policies of control that have shown to more than effective. The marketing and advertising of new tobacco products, even with reduced potential risk, seems more a serious threat than an opportunity for the development of smoking control policies.

  20. Stochastic Drought Risk Analysis and Projection Methods For Thermoelectric Power Systems

    Science.gov (United States)

    Bekera, Behailu Belamo

    Combined effects of socio-economic, environmental, technological and political factors impact fresh cooling water availability, which is among the most important elements of thermoelectric power plant site selection and evaluation criteria. With increased variability and changes in hydrologic statistical stationarity, one concern is the increased occurrence of extreme drought events that may be attributable to climatic changes. As hydrological systems are altered, operators of thermoelectric power plants need to ensure a reliable supply of water for cooling and generation requirements. The effects of climate change are expected to influence hydrological systems at multiple scales, possibly leading to reduced efficiency of thermoelectric power plants. This study models and analyzes drought characteristics from a thermoelectric systems operational and regulation perspective. A systematic approach to characterize a stream environment in relation to extreme drought occurrence, duration and deficit-volume is proposed and demonstrated. More specifically, the objective of this research is to propose a stochastic water supply risk analysis and projection methods from thermoelectric power systems operation and management perspectives. The study defines thermoelectric drought as a shortage of cooling water due to stressed supply or beyond operable water temperature limits for an extended period of time requiring power plants to reduce production or completely shut down. It presents a thermoelectric drought risk characterization framework that considers heat content and water quantity facets of adequate water availability for uninterrupted operation of such plants and safety of its surroundings. In addition, it outlines mechanisms to identify rate of occurrences of the said droughts and stochastically quantify subsequent potential losses to the sector. This mechanism is enabled through a model based on compound Nonhomogeneous Poisson Process. This study also demonstrates how

  1. Reducing the Risk of Methadone Overdose

    Centers for Disease Control (CDC) Podcasts

    2012-07-03

    This podcast is based on the July 2012 CDC Vital Signs report. Approximately 14 people die every day of overdoses related to methadone. Listen to learn how to reduce your risk of an overdose.  Created: 7/3/2012 by Centers for Disease Control and Prevention (CDC).   Date Released: 7/3/2012.

  2. Communication in reducing facility siting risk

    International Nuclear Information System (INIS)

    Bisconti, A.S.

    1992-01-01

    Today, social considerations are as important as technical ones in siting new nuclear facilities. Siting any industrial facility has become extremely difficult in this era of not in my backyard (NIMBY). Even if NIMBY does not arise locally, well-organized national opposition groups can be counted on to step in to fan the flames, especially when the industrial facility has to do with anything nuclear. It is now generally recognized that the greatest risk of failure for new nuclear facilities is not technical but social. Applying lessons gained from past experience and social science research can help reduce that risk. From these lessons, six principles for public interaction and communication stand out: (1) create goodwill now; (2) involve the community early; (3) establish the need; (4) communicate controls, not risk; (5) avoid jargon; (6) understand your public

  3. Equidistant map projections of a triaxial ellipsoid with the use of reduced coordinates

    Directory of Open Access Journals (Sweden)

    Pędzich Paweł

    2017-12-01

    Full Text Available The paper presents a new method of constructing equidistant map projections of a triaxial ellipsoid as a function of reduced coordinates. Equations for x and y coordinates are expressed with the use of the normal elliptic integral of the second kind and Jacobian elliptic functions. This solution allows to use common known and widely described in literature methods of solving such integrals and functions. The main advantage of this method is the fact that the calculations of x and y coordinates are practically based on a single algorithm that is required to solve the elliptic integral of the second kind. Equations are provided for three types of map projections: cylindrical, azimuthal and pseudocylindrical. These types of projections are often used in planetary cartography for presentation of entire and polar regions of extraterrestrial objects. The paper also contains equations for the calculation of the length of a meridian and a parallel of a triaxial ellipsoid in reduced coordinates. Moreover, graticules of three coordinates systems (planetographic, planetocentric and reduced in developed map projections are presented. The basic properties of developed map projections are also described. The obtained map projections may be applied in planetary cartography in order to create maps of extraterrestrial objects.

  4. Classifying IS Project Problems

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas

    2006-01-01

    The literature contains many lists of IS project problems, often in the form of risk factors. The problems sometimes appear unordered and overlapping, which reduces their usefulness to practitioners as well as theoreticians. This paper proposes a list of criteria for formulating project problems...

  5. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    Science.gov (United States)

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  6. A surety engineering framework to reduce cognitive systems risks.

    Energy Technology Data Exchange (ETDEWEB)

    Caudell, Thomas P. (University of New Mexico, Albuquerque, NM); Peercy, David Eugene; Caldera, Eva O. (University of New Mexico, Albuquerque, NM); Shaneyfelt, Wendy L.

    2008-12-01

    Cognitive science research investigates the advancement of human cognition and neuroscience capabilities. Addressing risks associated with these advancements can counter potential program failures, legal and ethical issues, constraints to scientific research, and product vulnerabilities. Survey results, focus group discussions, cognitive science experts, and surety researchers concur technical risks exist that could impact cognitive science research in areas such as medicine, privacy, human enhancement, law and policy, military applications, and national security (SAND2006-6895). This SAND report documents a surety engineering framework and a process for identifying cognitive system technical, ethical, legal and societal risks and applying appropriate surety methods to reduce such risks. The framework consists of several models: Specification, Design, Evaluation, Risk, and Maturity. Two detailed case studies are included to illustrate the use of the process and framework. Several Appendices provide detailed information on existing cognitive system architectures; ethical, legal, and societal risk research; surety methods and technologies; and educing information research with a case study vignette. The process and framework provide a model for how cognitive systems research and full-scale product development can apply surety engineering to reduce perceived and actual risks.

  7. Pegasus project. DLC coating and low viscosity oil reduce energy losses significantly

    Energy Technology Data Exchange (ETDEWEB)

    Doerwald, Dave; Jacobs, Ruud [Hauzer Techno Coating (Netherlands). Tribological Coatings

    2012-03-15

    Pegasus, the flying horse from Greek mythology, is a suitable name for the research project initiated by a German automotive OEM with participation of Hauzer Techno Coating and several automotive suppliers. It will enable future automotive vehicles to reduce fuel consumption without losing power. The project described in this article focuses on the rear differential, because reducing friction here can contribute considerably to efficiency improvement of the whole vehicle. Surfaces, coating and oil viscosity have been investigated and interesting conclusions have been reached. (orig.)

  8. MARR project risk matrices in radiotherapy; Proyecto MARR: matrices de riesgo en radioterapia

    Energy Technology Data Exchange (ETDEWEB)

    Ramirez, M. L.; Perez Mulas, A.; Vilanova, J.; Prieto, C.; Delgado, J. M.; Alvarez, C.; Rodriguez, M.

    2014-07-01

    Radiotherapy is a complex process not without risk for the patient. The Council de Nuclear Safety (CSN), based on its cooperation with the health authorities regarding radiation protection of patient is promoting, through the project MARR, (Risk matrix in radiotherapy) the risk analysis in the radiotherapy departments of our country. This project represents the extension of methodologies applied in the nuclear sector other radiological practices. The aim is to share, with professional societies, the knowledge acquired by the CSN during its participation in the Ibero-American Forum of regulators (Forum) projects. (Author)

  9. Development of strategies for effective communication of food risks and benefits across Europe: design and conceptual framework of the FoodRisC project.

    Science.gov (United States)

    Barnett, Julie; McConnon, Aine; Kennedy, Jean; Raats, Monique; Shepherd, Richard; Verbeke, Wim; Fletcher, Jon; Kuttschreuter, Margôt; Lima, Luisa; Wills, Josephine; Wall, Patrick

    2011-05-13

    FoodRisC project offers a unique approach to the investigation of food risk/benefit communication. The effective spread of food risk/benefit information will assist initiatives aimed at reducing the burden of food-related illness and disease, reducing the economic impact of food crises and ensuring that confidence in safe and nutritious food is fostered and maintained in Europe. © 2011 Barnett et al; licensee BioMed Central Ltd.

  10. Development of strategies for effective communication of food risks and benefits across Europe: Design and conceptual framework of the FoodRisC project

    Science.gov (United States)

    2011-01-01

    consumers in Europe. Discussion The FoodRisC project offers a unique approach to the investigation of food risk/benefit communication. The effective spread of food risk/benefit information will assist initiatives aimed at reducing the burden of food-related illness and disease, reducing the economic impact of food crises and ensuring that confidence in safe and nutritious food is fostered and maintained in Europe. PMID:21569458

  11. Development of strategies for effective communication of food risks and benefits across Europe: Design and conceptual framework of the FoodRisC project

    Directory of Open Access Journals (Sweden)

    Lima Luisa

    2011-05-01

    communicating coherent messages to consumers in Europe. Discussion The FoodRisC project offers a unique approach to the investigation of food risk/benefit communication. The effective spread of food risk/benefit information will assist initiatives aimed at reducing the burden of food-related illness and disease, reducing the economic impact of food crises and ensuring that confidence in safe and nutritious food is fostered and maintained in Europe.

  12. Development of strategies for effective communication of food risks and benefits across Europe: Design and conceptual framework of the FoodRisC project

    LENUS (Irish Health Repository)

    Barnett, Julie

    2011-05-13

    coherent messages to consumers in Europe. Discussion The FoodRisC project offers a unique approach to the investigation of food risk\\/benefit communication. The effective spread of food risk\\/benefit information will assist initiatives aimed at reducing the burden of food-related illness and disease, reducing the economic impact of food crises and ensuring that confidence in safe and nutritious food is fostered and maintained in Europe.

  13. The importance of a project level risk management methodology for EU Structural and Investment Funds accession in Romania

    Directory of Open Access Journals (Sweden)

    Nicolae Ciprian

    2017-07-01

    Full Text Available Accessing EU funds is considered to be an important development chance for all type of beneficiaries in Romania: public bodies, nongovernmental organizations and firms. The grounds for this are the amount of funds available per beneficiary and the co financing rate (for example, the investment projects for firms amounted up to 5 million Euro of EU funding at a EU co financing rate up to 70%. As the Romanian responsible authorities strive to conduct a fast and smooth process, the reality shows the funds accession is rather unpredictable and costly, both in terms of time consumption and financial resources. Lots of causes contribute to this situation, amongst which the inefficient risk management conducted, both by the state authorities responsible with the EU funds management and by the beneficiaries of funds. The effects are visible: a poor absorption rate of the EU structural and cohesion funds (79,23% at the level of January 2017 for the 2007-2013 financial period. The authors' research follows the importance that risk management should have in the process of managing and accessing EU funds. The research methodology starts from the responses that 170 people involved in managing EU funded projects within 2007-2013 financial period gave to an online questionnaire carried on in 2016. The focus was to establish if and how risk management methodologies/procedures/guidelines were used within the implementation of projects and in what measure this kind of approach should be compulsory or optional for the financial period 2014-2020. The research methodology further implied the analysis of key issues for projects financing such as: feasibility and opportunity determination, budgeting, projects' evaluation, etc. The main finding of the research is that applicants and beneficiaries need to implement project level risk management methodologies. Based on this, the authors propose a guideline for drafting project level risk management methodologies, that

  14. Managing the risks of a large-scale infrastructure project : The case of Spoorzone Delft

    NARCIS (Netherlands)

    Priemus, H.

    2012-01-01

    Risk management in large-scale infrastructure projects is attracting the attention of academics and practitioners alike. After a brief summary of the theoretical background, this paper describes how the risk analysis and risk management shaped up in a current large-scale infrastructure project in

  15. Reduced aliasing artifacts using shaking projection k-space sampling trajectory

    Science.gov (United States)

    Zhu, Yan-Chun; Du, Jiang; Yang, Wen-Chao; Duan, Chai-Jie; Wang, Hao-Yu; Gao, Song; Bao, Shang-Lian

    2014-03-01

    Radial imaging techniques, such as projection-reconstruction (PR), are used in magnetic resonance imaging (MRI) for dynamic imaging, angiography, and short-T2 imaging. They are less sensitive to flow and motion artifacts, and support fast imaging with short echo times. However, aliasing and streaking artifacts are two main sources which degrade radial imaging quality. For a given fixed number of k-space projections, data distributions along radial and angular directions will influence the level of aliasing and streaking artifacts. Conventional radial k-space sampling trajectory introduces an aliasing artifact at the first principal ring of point spread function (PSF). In this paper, a shaking projection (SP) k-space sampling trajectory was proposed to reduce aliasing artifacts in MR images. SP sampling trajectory shifts the projection alternately along the k-space center, which separates k-space data in the azimuthal direction. Simulations based on conventional and SP sampling trajectories were compared with the same number projections. A significant reduction of aliasing artifacts was observed using the SP sampling trajectory. These two trajectories were also compared with different sampling frequencies. A SP trajectory has the same aliasing character when using half sampling frequency (or half data) for reconstruction. SNR comparisons with different white noise levels show that these two trajectories have the same SNR character. In conclusion, the SP trajectory can reduce the aliasing artifact without decreasing SNR and also provide a way for undersampling reconstruction. Furthermore, this method can be applied to three-dimensional (3D) hybrid or spherical radial k-space sampling for a more efficient reduction of aliasing artifacts.

  16. Reduced aliasing artifacts using shaking projection k-space sampling trajectory

    International Nuclear Information System (INIS)

    Zhu Yan-Chun; Yang Wen-Chao; Wang Hao-Yu; Gao Song; Bao Shang-Lian; Du Jiang; Duan Chai-Jie

    2014-01-01

    Radial imaging techniques, such as projection-reconstruction (PR), are used in magnetic resonance imaging (MRI) for dynamic imaging, angiography, and short-T2 imaging. They are less sensitive to flow and motion artifacts, and support fast imaging with short echo times. However, aliasing and streaking artifacts are two main sources which degrade radial imaging quality. For a given fixed number of k-space projections, data distributions along radial and angular directions will influence the level of aliasing and streaking artifacts. Conventional radial k-space sampling trajectory introduces an aliasing artifact at the first principal ring of point spread function (PSF). In this paper, a shaking projection (SP) k-space sampling trajectory was proposed to reduce aliasing artifacts in MR images. SP sampling trajectory shifts the projection alternately along the k-space center, which separates k-space data in the azimuthal direction. Simulations based on conventional and SP sampling trajectories were compared with the same number projections. A significant reduction of aliasing artifacts was observed using the SP sampling trajectory. These two trajectories were also compared with different sampling frequencies. A SP trajectory has the same aliasing character when using half sampling frequency (or half data) for reconstruction. SNR comparisons with different white noise levels show that these two trajectories have the same SNR character. In conclusion, the SP trajectory can reduce the aliasing artifact without decreasing SNR and also provide a way for undersampling reconstruction. Furthermore, this method can be applied to three-dimensional (3D) hybrid or spherical radial k-space sampling for a more efficient reduction of aliasing artifacts

  17. Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects.

    Science.gov (United States)

    Aminbakhsh, Saman; Gunduz, Murat; Sonmez, Rifat

    2013-09-01

    The inherent and unique risks on construction projects quite often present key challenges to contractors. Health and safety risks are among the most significant risks in construction projects since the construction industry is characterized by a relatively high injury and death rate compared to other industries. In construction project management, safety risk assessment is an important step toward identifying potential hazards and evaluating the risks associated with the hazards. Adequate prioritization of safety risks during risk assessment is crucial for planning, budgeting, and management of safety related risks. In this paper, a safety risk assessment framework is presented based on the theory of cost of safety (COS) model and the analytic hierarchy process (AHP). The main contribution of the proposed framework is that it presents a robust method for prioritization of safety risks in construction projects to create a rational budget and to set realistic goals without compromising safety. The framework provides a decision tool for the decision makers to determine the adequate accident/injury prevention investments while considering the funding limits. The proposed safety risk framework is illustrated using a real-life construction project and the advantages and limitations of the framework are discussed. Copyright © 2013 National Safety Council and Elsevier Ltd. All rights reserved.

  18. Case management to reduce cardiovascular disease risk in American Indians and Alaska Natives with diabetes: results from the Special Diabetes Program for Indians Healthy Heart Demonstration Project.

    Science.gov (United States)

    Moore, Kelly; Jiang, Luohua; Manson, Spero M; Beals, Janette; Henderson, William; Pratte, Katherine; Acton, Kelly J; Roubideaux, Yvette

    2014-11-01

    We evaluated cardiovascular disease (CVD) risk factors in American Indians/Alaska Natives (AI/ANs) with diabetes in the Special Diabetes Program for Indians Healthy Heart (SDPI-HH) Demonstration Project. Multidisciplinary teams implemented an intensive case management intervention among 30 health care programs serving 138 tribes. The project recruited 3373 participants, with and without current CVD, between 2006 and 2009. We examined data collected at baseline and 1 year later to determine whether improvements occurred in CVD risk factors and in Framingham coronary heart disease (CHD) risk scores, aspirin use, and smoking status. A1c levels decreased an average of 0.2% (P risk scores also decreased significantly. Aspirin therapy increased significantly, and smoking decreased. Participants with more case management visits had significantly greater reductions in LDL cholesterol and A1c values. SDPI-HH successfully translated an intensive case management intervention. Creative retention strategies and an improved understanding of organizational challenges are needed for future Indian health translational efforts.

  19. Methodology evaluation of innovative projects under risk and uncertainty

    Directory of Open Access Journals (Sweden)

    2012-09-01

    Full Text Available This article deals with problems connected with the assessment of innovative projects in the context of risk and uncertainty, topical issues of evaluation of innovative projects at the present stage of development of the Russian economy. By the example of the solution of the "crossing the river" is considering the possibility of using hierarchical models to address it. In what follows, and compares the priorities of different groups of factors are given by calculating the overall costs and benefits. The paper provides a rationale for combined use of four aspects: the beneficial aspects of the decision (the benefits and opportunities and negative (costs and risks that may lead to the decision in question.

  20. Reducing the Risks for Contrast-Induced Nephropathy

    International Nuclear Information System (INIS)

    Stacul, Fulvio

    2005-01-01

    Contrast-induced nephropathy (CIN) is one of the most serious adverse events associated with the use of contrast media (CM). Patients who develop this complication can have increased morbidity, higher rates of mortality, lengthy hospital stays, and poor long-term outcomes. Although CIN cannot be eliminated, the chances of developing this condition can be reduced by using appropriate prevention strategies. An important first step to reduce the chance of CIN is to identify risk factors associated with this condition. Patients with a previously elevated serum creatinine level, especially when secondary to diabetic nephropathy, are at great risk for developing CIN. Other patient-related risk factors include concurrent use of nephrotoxic medications, dehydration, congestive heart failure, age greater than 70 years, and probably the presence of diabetes mellitus even if serum creatinine is normal. Adequate hydration is widely accepted as an important prophylactic measure for preventing CIN, but the optimal hydration regimen is still debatable. The risk of CIN increases with greater doses of CM, as well as with the type of CM used. A high-osmolar CM poses a greater risk of CIN than does a low-osmolar CM and, as recent but limited data suggest, the use of an iso-osmolar CM is less nephrotoxic than a low-osmolar CM in patients with renal impairment following intra-arterial procedures, although this finding needs to be verified in future clinical studies. Pharmacologic agents such as calcium channel blockers, dopamine, atrial natriuretic peptide, fenoldopam, prostaglandin E1, and endothelin receptor antagonist have not been proven effective against CIN development. Controversies still exist on the possible effectiveness of theophylline and N-acetylcysteine. Simple strategies for the prevention of CIN in at-risk patients are reviewed and unproven interventions are discussed

  1. Reducing the harms associated with risk assessments

    International Nuclear Information System (INIS)

    Montague, Peter

    2004-01-01

    Risk assessments are the intellectual products of dedicated public health and environmental professionals. Like many other products, risk assessments carry with them the potential for both good and harm. This paper briefly examines some of the harms to which risk assessments have contributed, and then suggests that the legal 'duty to warn' doctrine offers a logical and practical way to reduce some of these harms. The paper suggests concepts that could be incorporated into warnings accompanying every formal risk assessment as routine 'boiler plate' addenda, just as other potentially harmful products, such as lawn mowers and cook stoves, are accompanied by warnings. Finally, the paper briefly examines the 'Code of Ethics and Standards of Practice for Environmental Professionals' (promulgated by the National Association of Environmental Professionals) and shows that the suggested warnings are consistent with recommended practices for environmental professionals

  2. The integration of the risk in the governance of urban projects: a key issue for a resilient city

    Science.gov (United States)

    Moulin, E.; Deroubaix, J.-F.

    2012-04-01

    (South-East Paris), into a project including residential and office buildings and other amenities. In order to elaborate the master plan, the urban planning authority brought together some flood risk experts. With the remarks of the experts, the architect in charge of the landuse elaborated the master plan taking into account the flood risk; reducing vulnerability of the area and improving the resilience in case of floods, towards a threshold plan. How the experts' recommendations appear in the execution phase? We will show how the project completes or departs from the regulatory policy concerning the drawing up and the implementation of the prevention/protection against flood risk in France. How the vulnerability reduction or the resilience improvement reproduce the regulatory fragmentation, i.e.; on one hand the risk prevention plan and on the other hand the crisis management? We will demonstrate how a resilient approach should mix the several regulatory segments and put the inhabitant in the middle of the urban project thanks to suitable urban forms.

  3. Major risk from rapid, large-volume landslides in Europe (EU Project RUNOUT)

    Science.gov (United States)

    Kilburn, Christopher R. J.; Pasuto, Alessandro

    2003-08-01

    Project RUNOUT has investigated methods for reducing the risk from large-volume landslides in Europe, especially those involving rapid rates of emplacement. Using field data from five test sites (Bad Goisern and Köfels in Austria, Tessina and Vajont in Italy, and the Barranco de Tirajana in Gran Canaria, Spain), the studies have developed (1) techniques for applying geomorphological investigations and optical remote sensing to map landslides and their evolution; (2) analytical, numerical, and cellular automata models for the emplacement of sturzstroms and debris flows; (3) a brittle-failure model for forecasting catastrophic slope failure; (4) new strategies for integrating large-area Global Positioning System (GPS) arrays with local geodetic monitoring networks; (5) methods for raising public awareness of landslide hazards; and (6) Geographic Information System (GIS)-based databases for the test areas. The results highlight the importance of multidisciplinary studies of landslide hazards, combining subjects as diverse as geology and geomorphology, remote sensing, geodesy, fluid dynamics, and social profiling. They have also identified key goals for an improved understanding of the physical processes that govern landslide collapse and runout, as well as for designing strategies for raising public awareness of landslide hazards and for implementing appropriate land management policies for reducing landslide risk.

  4. Mitigating flood exposure: Reducing disaster risk and trauma signature.

    Science.gov (United States)

    Shultz, James M; McLean, Andrew; Herberman Mash, Holly B; Rosen, Alexa; Kelly, Fiona; Solo-Gabriele, Helena M; Youngs, Georgia A; Jensen, Jessica; Bernal, Oscar; Neria, Yuval

    2013-01-01

    Introduction. In 2011, following heavy winter snowfall, two cities bordering two rivers in North Dakota, USA faced major flood threats. Flooding was foreseeable and predictable although the extent of risk was uncertain. One community, Fargo, situated in a shallow river basin, successfully mitigated and prevented flooding. For the other community, Minot, located in a deep river valley, prevention was not possible and downtown businesses and one-quarter of the homes were inundated, in the city's worst flood on record. We aimed at contrasting the respective hazards, vulnerabilities, stressors, psychological risk factors, psychosocial consequences, and disaster risk reduction strategies under conditions where flood prevention was, and was not, possible. Methods . We applied the "trauma signature analysis" (TSIG) approach to compare the hazard profiles, identify salient disaster stressors, document the key components of disaster risk reduction response, and examine indicators of community resilience. Results . Two demographically-comparable communities, Fargo and Minot, faced challenging river flood threats and exhibited effective coordination across community sectors. We examined the implementation of disaster risk reduction strategies in situations where coordinated citizen action was able to prevent disaster impact (hazard avoidance) compared to the more common scenario when unpreventable disaster strikes, causing destruction, harm, and distress. Across a range of indicators, it is clear that successful mitigation diminishes both physical and psychological impact, thereby reducing the trauma signature of the event. Conclusion . In contrast to experience of historic flooding in Minot, the city of Fargo succeeded in reducing the trauma signature by way of reducing risk through mitigation.

  5. Integrating knowledge for managing risk in infrastructure projects : the case of tunnel works

    NARCIS (Netherlands)

    Chivatá Cárdenas, Ibsen

    2012-01-01

    The objective of traditional approaches to project risk management is to identify risks that can lead to project failure and to implement effective strategies to manage them. Information on the relevant causes and conditions in which failures arise is usually required as necessary input for

  6. Sociocultural tailoring of a healthy lifestyle intervention to reduce cardiovascular disease and type 2 diabetes risk among Latinos.

    Science.gov (United States)

    Mudd-Martin, Gia; Martinez, Maria C; Rayens, Mary Kay; Gokun, Yevgeniya; Meininger, Janet C

    2013-11-27

    Suboptimal lifestyle factors in combination with genetic susceptibility contribute to cardiovascular disease and type 2 diabetes risk among Latinos. We describe a community-academic collaboration that developed and explored the feasibility of implementing a socioculturally tailored, healthy lifestyle intervention integrating genomics and family history education to reduce risk of cardiovascular disease and type 2 diabetes among Latinos. The community-based participatory research was conducted with communities in Kentucky, which has a rapidly growing Latino population. This growth underscores the need for socioculturally appropriate health resources. Su Corazon, Su Vida (Your Heart, Your Life) is a Spanish-language, healthy lifestyle educational program to reduce cardiovascular disease and type 2 diabetes risk among Latinos. Twenty natural leaders from an urban Latino community in Kentucky participated in sociocultural tailoring of the program and development of a genomics and family history module. The tailored program was presented to 22 participants to explore implementation feasibility and assess appropriateness for community use. Preintervention and postintervention assessments of genomic knowledge and lifestyle behaviors and qualitative postintervention evaluations were conducted. Postintervention improvements in health-promoting lifestyle choices and genomic knowledge specific to cardiovascular disease and type 2 diabetes suggested that the program may be effective in reducing risk. Feedback indicated the program was socioculturally acceptable and responsive to community needs. These findings indicated that a tailored healthy lifestyle program integrating genomics and family history education was socioculturally appropriate and may feasibly be implemented to reduce cardiovascular disease and type 2 diabetes risk in a Latino community with limited health care resources. The project highlights contributions of community-based processes in tailoring

  7. Influence of the Risk-Contributing Factors on the Financing of the Investment Project for Building of Intelligent Buildings

    Directory of Open Access Journals (Sweden)

    Voytolovskiy Nikolay

    2017-01-01

    Full Text Available This article provides the generic classification of risks of the investment projects for the construction of intelligent buildings which differ by the detachment of the subjective perception of risk by the investor. Risk and uncertainty were justified as system characteristics of the investment projects for the construction of intelligent buildings. Characteristics of the development was given in the context of project management. Methodical schemes of the development of the investment project risks were specified on the basis of interconnection of risk and project effectiveness. Risk management procedure at realization of the developer project was developed.

  8. Reducing risks, protecting people. A harmonized approach

    International Nuclear Information System (INIS)

    Foster, R.B.

    2000-01-01

    Risk training, education and communication usually refer to the responsibilities of those who generate risk (e.g. operators of nuclear power plants) towards those who are exposed to the risk (e.g. employees working in the plants and those living in the vicinity). In this context training, education and communication are intended to transfer information from risk professionals to a largely uninformed audience, with a view to improving standards or providing reassurance. However, with the growth of media such as the Internet those to whom such training, education and communication have traditionally been directed are now much better informed. In addition, increasing prosperity affects expectations and prompts questions, not only about the adequacy of the control measures intended to address specific hazards, but also about whether the hazardous activity is justified at all. Within the UK (and Europe) this is very evident for nuclear power, other applications of ionizing radiation, and in other areas such as genetically modified food. In consequence regulators of hazardous activities face considerable new challenges. Of course, regulators still have to formulate standards, communicate them to those responsible for risk reduction and see that the necessary controls are in place. But in addition regulators also have to be able to answer questions such as: - why is this hazardous activity (e.g. a nuclear power plant) allowed at all? - what level of risk is unacceptable? - is the approach to risk reduction sufficiently precautionary? - why shouldn't the risk be reduced further? - why are the risks from certain activities (e.g. those from ionizing radiation) controlled to much lower levels than those from other work activities? - how are decisions made, what criteria are applied and how are the stake holders involves? All this does not make life easy for regulators! The full paper will describe how the Health and Safety Executive (HSE) has responded to these challenges by

  9. MRO CRISM MAP-PROJECTED TARGETED REDUCED DATA RECORD V1.0

    Data.gov (United States)

    National Aeronautics and Space Administration — This volume contains the CRISM Map-projected Targeted Reduced Data Record (MTRDR) archive, a collection of multiband image cubes derived from targeted (gimbaled)...

  10. Engineering risk assessment for emergency disposal projects of sudden water pollution incidents.

    Science.gov (United States)

    Shi, Bin; Jiang, Jiping; Liu, Rentao; Khan, Afed Ullah; Wang, Peng

    2017-06-01

    Without an engineering risk assessment for emergency disposal in response to sudden water pollution incidents, responders are prone to be challenged during emergency decision making. To address this gap, the concept and framework of emergency disposal engineering risks are reported in this paper. The proposed risk index system covers three stages consistent with the progress of an emergency disposal project. Fuzzy fault tree analysis (FFTA), a logical and diagrammatic method, was developed to evaluate the potential failure during the process of emergency disposal. The probability of basic events and their combination, which caused the failure of an emergency disposal project, were calculated based on the case of an emergency disposal project of an aniline pollution incident in the Zhuozhang River, Changzhi, China, in 2014. The critical events that can cause the occurrence of a top event (TE) were identified according to their contribution. Finally, advices on how to take measures using limited resources to prevent the failure of a TE are given according to the quantified results of risk magnitude. The proposed approach could be a potential useful safeguard for the implementation of an emergency disposal project during the process of emergency response.

  11. Managing Risk, Reducing Vulnerability and Enhancing Productivity ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Managing Risk, Reducing Vulnerability and Enhancing Productivity under a Changing Climate. The countries of the Greater Horn of Africa are particularly vulnerable to drought, exacerbated by widespread poverty and dependence on rainfed agriculture. Even with normal rainfall, the region does not produce enough food to ...

  12. Deep Uncertainty Surrounding Coastal Flood Risk Projections: A Case Study for New Orleans

    Science.gov (United States)

    Wong, Tony E.; Keller, Klaus

    2017-10-01

    Future sea-level rise drives severe risks for many coastal communities. Strategies to manage these risks hinge on a sound characterization of the uncertainties. For example, recent studies suggest that large fractions of the Antarctic ice sheet (AIS) may rapidly disintegrate in response to rising global temperatures, leading to potentially several meters of sea-level rise during the next few centuries. It is deeply uncertain, for example, whether such an AIS disintegration will be triggered, how much this would increase sea-level rise, whether extreme storm surges intensify in a warming climate, or which emissions pathway future societies will choose. Here, we assess the impacts of these deep uncertainties on projected flooding probabilities for a levee ring in New Orleans, LA. We use 18 scenarios, presenting probabilistic projections within each one, to sample key deeply uncertain future projections of sea-level rise, radiative forcing pathways, storm surge characterization, and contributions from rapid AIS mass loss. The implications of these deep uncertainties for projected flood risk are thus characterized by a set of 18 probability distribution functions. We use a global sensitivity analysis to assess which mechanisms contribute to uncertainty in projected flood risk over the course of a 50-year design life. In line with previous work, we find that the uncertain storm surge drives the most substantial risk, followed by general AIS dynamics, in our simple model for future flood risk for New Orleans.

  13. A Probabilistic Alternative Approach to Optimal Project Profitability Based on the Value-at-Risk

    Directory of Open Access Journals (Sweden)

    Yonggu Kim

    2018-03-01

    Full Text Available This paper focuses on an investment decision-making process for sustainable development based on the profitability impact factors for overseas projects. Investors prefer to use the discounted cash-flow method. Although this method is simple and straightforward, its critical weakness is its inability to reflect the factor volatility associated with the project evaluation. To overcome this weakness, the Value-at-Risk method is used to apply the volatility of the profitability impact factors, thereby reflecting the risks and establishing decision-making criteria for risk-averse investors. Risk-averse investors can lose relatively acceptable investment opportunities to risk-neutral or risk-amenable investors due to strict investment decision-making criteria. To overcome this problem, critical factors are selected through a Monte Carlo simulation and a sensitivity analysis, and solutions to the critical-factor problems are then found by using the Theory of Inventive Problem Solving and a business version of the Project Definition Rating Index. This study examines the process of recovering investment opportunities with projects that are investment feasible and that have been rejected when applying the criterion of the Value-at-Risk method. To do this, a probabilistic alternative approach is taken. To validate this methodology, the proposed framework for an improved decision-making process is demonstrated using two actual overseas projects of a Korean steel-making company.

  14. Simulated Annealing Genetic Algorithm Based Schedule Risk Management of IT Outsourcing Project

    Directory of Open Access Journals (Sweden)

    Fuqiang Lu

    2017-01-01

    Full Text Available IT outsourcing is an effective way to enhance the core competitiveness for many enterprises. But the schedule risk of IT outsourcing project may cause enormous economic loss to enterprise. In this paper, the Distributed Decision Making (DDM theory and the principal-agent theory are used to build a model for schedule risk management of IT outsourcing project. In addition, a hybrid algorithm combining simulated annealing (SA and genetic algorithm (GA is designed, namely, simulated annealing genetic algorithm (SAGA. The effect of the proposed model on the schedule risk management problem is analyzed in the simulation experiment. Meanwhile, the simulation results of the three algorithms GA, SA, and SAGA show that SAGA is the most superior one to the other two algorithms in terms of stability and convergence. Consequently, this paper provides the scientific quantitative proposal for the decision maker who needs to manage the schedule risk of IT outsourcing project.

  15. Interconnection of the Degree of Risk and Life Cycle of the “Green Construction” Investment Projects

    OpenAIRE

    Lepehova Natalia; Shoshinov Vitaly

    2017-01-01

    This article analyses interconnection of the degree of risk and the life cycle of the “green building” investment projects, which is structured according to the life cycle. Main stages of the implementation of investment and construction project were considered, interconnection of the project life cycle and the level of project risk were presented in the form of graphical model, proposed a mathematical model of the risk calculation at different stages of the project life cycle, which is a fun...

  16. RIBA Project - Risk-Informed approach for In-Service Inspection of Nuclear Power Plant Components. Project summary

    International Nuclear Information System (INIS)

    Lidbury, D.; Smith, G.

    2001-12-01

    The need for a European review of a Risk-Informed Approach for In-Service Inspection of Nuclear Power Plant Components (RIBA) was identified in 1998. This was as a priority item in the programme of activities conducted in the framework of the Council Resolutions of 22 July 1975 and of 18 June 1992 on the Technological Problems of Nuclear Safety. The RIBA Project was established in November 1999 as a 24-month Study Contract funded by the European Commission within the frame of the former DG XI WGCS (Working Group on Codes and Standards). The Study Contract was subsequently managed for the EC by DG TREN. The participants in RIBA were Serco Assurance (project coordinator), Ringhals AB, EDF, Tecnatom SA and Westinghouse Electric Europe. The work is presented in a summary report with the detailed results contained in three companion reports as follows: main conclusions and recommendations, Review of Existing Risk-Informed Methodologies, A Comparative Study of Risk-Informed In-Service Inspection Applications, Conclusions and Recommendations for Risk-Informed in-service inspection methodology applied to Nuclear Power Plants in Europe. (author)

  17. Risk assessment in energy efficiency projects; Gerenciamento de riscos em projetos de eficiencia energetica

    Energy Technology Data Exchange (ETDEWEB)

    Aragao Neto, Raymundo Moniz de

    2003-08-15

    This paper aims to present processes related to risk management in energy efficiency projects, delivered in a performance contracting basis. Introductory comments will be presented about the considered project model, emphasizing the necessity of proper processes of risk management and evaluation and their treatment according methodology developed by PMI - Project Management Institute, grouped in its publication PMBOK - Project Management Body of Knowledge. A hypothetical project will be demonstrated, but similar to the Brazilian Body of Knowledge. A hypothetical project will be demonstrated, but similar to the Brazilian market reality, as a form of illustrating the considered methodology.

  18. Highlight report: Launch of a large integrated European in vitro toxicology project: EU-ToxRisk.

    Science.gov (United States)

    Daneshian, Mardas; Kamp, Hennicke; Hengstler, Jan; Leist, Marcel; van de Water, Bob

    2016-05-01

    The integrated European project, EU-ToxRisk, proudly sees itself as "flagship" exploring new alternative-to-animal approaches to chemical safety evaluation. It promotes mechanism-based toxicity testing and risk assessment according to the principles laid down for toxicology for the twenty-first century. The project was officially launched in January 2016 with a kickoff meeting in Egmond aan Zee, the Netherlands. Over 100 scientists representing academia and industry as well as regulatory authorities attended the inaugural meeting. The project will integrate advances in in vitro and in silico toxicology, read-across methods, and adverse outcome pathways. EU-ToxRisk will continue to make use of the case study strategy deployed in SEURAT-1, a FP7 initiative ended in December 2015. Even though the development of new non-animal methods is one target of EU-ToxRisk, the project puts special emphasis on their acceptance and implementation in regulatory contexts. This €30 million Horizon 2020 project involves 38 European partners and one from the USA. EU-ToxRisk aims at the "development of a new way of risk assessment."

  19. Assessing reservoir performance risk in CO2 storage projects

    International Nuclear Information System (INIS)

    Bowden, A.R.; Rigg, A.

    2005-01-01

    One of the main issues for researchers involved with geological storage of carbon dioxide (CO 2 ) has been the development of a proper methodology to assess and compare alternative CO 2 injection projects on the basis of risk. Consideration needs to be given to technical aspects, such as the risk of leakage and the effectiveness of the intended reservoir, as well as less tangible aspects such as the value and safety of geological storage of CO 2 , and potential impacts on the community and environment. The Geological Disposal of Carbon Dioxide (GEODISC), was a research program of the Australian Petroleum Cooperative Research Centre which identified 56 potential environmentally sustainable sites for CO 2 injection (ESSCIs) within Australia. Several studies were carried out, involving detailed evaluation of the suitability of 4 selected sites, including Dongara, Petrel, Gippsland and Carnarvon. The GEODISC program included a risk assessment research module which required a complete and quantified risk assessment of CO 2 injection as a storage option. Primary goals were to assess the risk of leakage, to assess the effectiveness of the intended reservoir, and to assess negative consequences to facilitate comparison of alternative sites. This paper discussed the background and risk assessment model. Key performance indicators (KPIs) were also developed to address the purpose of risk assessment. It was concluded that the RISQUE method is an appropriate approach and that potential injection projects can be measured against six KPIs including containment; effectiveness; self-funding potential; wider community benefits; community safety and community amenity. 6 refs., 3 tabs., 3 figs

  20. Managing dependencies in forest offset projects: toward a more complete evaluation of reversal risk

    Science.gov (United States)

    David M Cooley; Chrsitopher S Galik; Thomas P Holmes; Carolyn Kousky; Roger M Cooke

    2011-01-01

    Although forest carbon offsets can play an important role in the implementation of comprehensive climate policy, they also face an inherent risk of reversal. If such risks are positively correlated across projects, it can affect the integrity of larger project portfolios and potentially the entire offsets program. Here, we discuss three types of risks that could affect...

  1. Alpha-risk: a European project on the quantification of risks associated with multiple radiation exposures

    International Nuclear Information System (INIS)

    Laurier, D.; Monchaux, G.; Tirmarche, M.; Darby, S.; Cardis, E.; Binks, K.; Hofmann, W.; Muirhead, C.

    2006-01-01

    The Alpha-Risk research project is being conducted within the Sixth European Framework Programme (EC-FP6, 2005 -2008). It aims to improve the quantification of risks associated with multiple exposures, taking into account the contribution of different radionuclides and external exposure using specific organ dose calculations. The Alpha-Risk Consortium involves 18 partners from 9 countries, and is coordinated by the IRSN. Its composition allows a multidisciplinary collaboration between researchers in epidemiology, dosimetry, statistics, modelling and risk assessment. Alpha-Risk brings together major epidemiological studies in Europe, which are able to evaluate long-term health effects of internal exposure from radionuclides. It includes large size cohort and case-control studies, with accurate registration of individual annual exposures: uranium miner studies, studies on lung cancer and indoor radon exposure, and studies of lung cancer and leukaemia among nuclear workers exposed to transuranic nuclides (mainly uranium and plutonium), for whom organ doses will be reconstructed individually. The contribution of experts in dosimetry will allow the calculation of organ doses in presence of multiple exposures (radon decay products, uranium dust and external gamma exposure). Expression of the risk per unit organ dose will make it possible to compare results with those from other populations exposed to external radiation. The multidisciplinary approach of Alpha-Risk promotes the development of coherent and improved methodological approaches regarding risk modelling. A specific work - package is dedicated to the integration of results and their use for risk assessment, especially for radon. Alpha-Risk will contribute to a better understanding of long-term health risks following chronic low doses from internal exposures. The project also has the great potential to help resolve major public health concerns about the effects of low and/or protracted exposures, especially

  2. Biophysical risks to carbon sequestration and storage in Australian drylands.

    Science.gov (United States)

    Nolan, Rachael H; Sinclair, Jennifer; Eldridge, David J; Ramp, Daniel

    2018-02-15

    Carbon abatement schemes that reduce land clearing and promote revegetation are now an important component of climate change policy globally. There is considerable potential for these schemes to operate in drylands which are spatially extensive. However, projects in these environments risk failure through unplanned release of stored carbon to the atmosphere. In this review, we identify factors that may adversely affect the success of vegetation-based carbon abatement projects in dryland ecosystems, evaluate their likelihood of occurrence, and estimate the potential consequences for carbon storage and sequestration. We also evaluate management strategies to reduce risks posed to these carbon abatement projects. Identified risks were primarily disturbances, including unplanned fire, drought, and grazing. Revegetation projects also risk recruitment failure, thereby failing to reach projected rates of sequestration. Many of these risks are dependent on rainfall, which is highly variable in drylands and susceptible to further variation under climate change. Resprouting vegetation is likely to be less vulnerable to disturbance and have faster recovery rates upon release from disturbance. We conclude that there is a strong impetus for identifying management strategies and risk reduction mechanisms for carbon abatement projects. Risk mitigation would be enhanced by effective co-ordination of mitigation strategies at scales larger than individual abatement project boundaries, and by implementing risk assessment throughout project planning and implementation stages. Reduction of risk is vital for maximising carbon sequestration of individual projects and for reducing barriers to the establishment of new projects entering the market. Copyright © 2017 Elsevier Ltd. All rights reserved.

  3. Reducing construction waste: A study of urban infrastructure projects.

    Science.gov (United States)

    de Magalhães, Ruane Fernandes; Danilevicz, Ângela de Moura Ferreira; Saurin, Tarcisio Abreu

    2017-09-01

    The construction industry is well-known for producing waste detrimental to the environment, and its impacts have increased with the development process of cities. Although there are several studies focused on the environmental impact of residential and commercial buildings, less knowledge is available regarding decreasing construction waste (CW) generation in urban infrastructure projects. This study presents best practices to reduce waste in the said projects, stressing the role of decision-making in the design stage and the effective management of construction processes in public sector. The best practices were identified from literature review, document analysis in 14 projects of urban infrastructure, and both qualitative and quantitative survey with 18 experts (architects and engineers) playing different roles on those projects. The contributions of these research are: (i) the identification of the main building techniques related to the urban design typologies analyzed; (ii) the identification of cause-effect relationships between the design choices and the CW generation diagnosis; (iii) the proposal of a checklist to support the decision-making process, that can be used as a control and evaluation instrument when developing urban infrastructure designs, focused on the construction waste minimization (CWM). Copyright © 2017 Elsevier Ltd. All rights reserved.

  4. Construction contract risk and reasonable evasions

    International Nuclear Information System (INIS)

    Wu Yunpeng

    2012-01-01

    Construction project has the characteristics such as large-scale investment, long-period implementation, excessive uncertainties,a single piece of production, etc. These characteristics determine the complexity of a construction project contract. To guarantee the time limit and quality of a project, finding ways to reduce and evade the contract risks as well as avoid unnecessary disputes are urgent requirements for each project manager. According to the practical situation, project contract risks are analyzed and illustrated in detail, and the concrete solutions for evading those risks are put forward. (authors)

  5. Probabilistic risk assessment of earthquakes at the Rocky Flats Plant and subsequent upgrade to reduce risk

    International Nuclear Information System (INIS)

    Day, S.A.

    1989-01-01

    An analysis to determine the risk associated with earthquakes at the Rocky Flats Plant was performed. Seismic analyses and structural evaluations were used to postulate building and equipment damage and radiological releases to the environment from various magnitudes of earthquakes. Dispersion modeling and dose assessment to the public were then calculated. The frequency of occurrence of various magnitudes of earthquakes were determined from the Department of Energy natural Phenomena Hazards Modeling Project. Risk to the public was probabilistically assessed for each magnitude of earthquake and for overall seismic risk. Based on the results of this Probabilistic Risk Assessment and a cost/benefit analysis, seismic upgrades are being implemented for several plutonium-handling facilities for the purpose of risk reduction

  6. Reducing Transaction Costs for Energy Efficiency Investments and Analysis of Economic Risk Associated With Building Performance Uncertainties: Small Buildings and Small Portfolios Program

    Energy Technology Data Exchange (ETDEWEB)

    Langner, R.; Hendron, B.; Bonnema, E.

    2014-08-01

    The small buildings and small portfolios (SBSP) sector face a number of barriers that inhibit SBSP owners from adopting energy efficiency solutions. This pilot project focused on overcoming two of the largest barriers to financing energy efficiency in small buildings: disproportionately high transaction costs and unknown or unacceptable risk. Solutions to these barriers can often be at odds, because inexpensive turnkey solutions are often not sufficiently tailored to the unique circumstances of each building, reducing confidence that the expected energy savings will be achieved. To address these barriers, NREL worked with two innovative, forward-thinking lead partners, Michigan Saves and Energi, to develop technical solutions that provide a quick and easy process to encourage energy efficiency investments while managing risk. The pilot project was broken into two stages: the first stage focused on reducing transaction costs, and the second stage focused on reducing performance risk. In the first stage, NREL worked with the non-profit organization, Michigan Saves, to analyze the effects of 8 energy efficiency measures (EEMs) on 81 different baseline small office building models in Holland, Michigan (climate zone 5A). The results of this analysis (totaling over 30,000 cases) are summarized in a simple spreadsheet tool that enables users to easily sort through the results and find appropriate small office EEM packages that meet a particular energy savings threshold and are likely to be cost-effective.

  7. Identifying critical nutrient intake in groups at risk of poverty in Europe: the CHANCE project approach.

    Science.gov (United States)

    Nikolić, Marina; Glibetić, Maria; Gurinović, Mirjana; Milešević, Jelena; Khokhar, Santosh; Chillo, Stefania; Abaravicius, Jonas Algis; Bordoni, Alessandra; Capozzi, Francesco

    2014-04-02

    The aim of the CHANCE project is to develop novel and affordable nutritious foods to optimize the diet and reduce the risk of diet-related diseases among groups at risk of poverty (ROP). This paper describes the methodology used in the two initial steps to accomplish the project's objective as follows: 1. a literature review of existing data and 2. an identification of ROP groups with which to design and perform the CHANCE nutritional survey, which will supply new data that is useful for formulating the new CHANCE food. Based on the literature review, a low intake of fruit and vegetables, whole grain products, fish, energy, fiber, vitamins B1, B2, B3, B6, B12 and C, folate, calcium, magnesium, iron, potassium and zinc and a high intake of starchy foods, processed meat and sodium were apparent. However, the available data appeared fragmented because of the different methodologies used in the studies. A more global vision of the main nutritional problems that are present among low-income people in Europe is needed, and the first step to achieve this goal is the use of common criteria to define the risk of poverty. The scoring system described here represents novel criteria for defining at-risk-of-poverty groups not only in the CHANCE-participating countries but also all over Europe.

  8. Acid-reducing vagotomy is associated with reduced risk of subsequent ischemic heart disease in complicated peptic ulcer

    Science.gov (United States)

    Wu, Shih-Chi; Fang, Chu-Wen; Chen, William Tzu-Liang; Muo, Chih-Hsin

    2016-01-01

    Abstract Persistent exacerbation of a peptic ulcer may lead to a complicated peptic ulcer (perforation or/and bleeding). The management of complicated peptic ulcers has shifted from acid-reducing vagotomy, drainage, and gastrectomy to simple local suture or non-operative (endoscopic/angiographic) hemostasis. We were interested in the long-term effects of this trend change. In this study, complicated peptic ulcer patients who received acid-reducing vagotomy were compared with those who received simple suture/hemostasis to determine the risk of ischemic heart disease (IHD). This retrospective cohort study analyzed 335,680 peptic ulcer patients recorded from 2000 to 2006 versus 335,680 age-, sex-, comorbidity-, and index-year matched comparisons. Patients with Helicobacter pylori (HP) infection were excluded. In order to identify the effect of vagus nerve severance, patients who received gastrectomy or antrectomy were also excluded. The incidence of IHD in both cohorts, and in the complicated peptic ulcer patients who received acid-reducing vagotomy versus those who received simple suture or hemostasis was evaluated. The overall incidence of IHD was higher in patients with peptic ulcer than those without peptic ulcer (17.00 vs 12.06 per 1000 person-years), with an adjusted hazard ratio (aHR) of 1.46 based on multivariable Cox proportional hazards regression analysis controlling for age, sex, Charlson's comorbidity index, and death (competing risk). While comparing peptic ulcer patients with acid-reducing vagotomy to those with simple suture/hemostasis or those without surgical treatment, the aHR (0.58) was the lowest in the acid-reducing vagotomy group. Patients with peptic ulcer have an elevated risk of IHD. However, complicated peptic ulcer patients who received acid-reducing vagotomy were associated with reduced risk of developing IHD. PMID:27977613

  9. Assessing Risk and Driving Risk Mitigation for First-of-a-Kind Advanced Reactors

    International Nuclear Information System (INIS)

    Collins, John W.

    2011-01-01

    . Product - Risk Handling Strategy. STEP 4 - Residual Risk Work off The risk handling strategy is entered into the Project Risk Allocation Tool (PRAT) to analyze each task for its ability to reduce risk. The result is risk-informed task prioritization. The risk handling strategy is captured in the Risk Management System, a relational database that provides conventional database utility, including data maintenance, archiving, configuration control, and query ability. The tool's Hierarchy Tree allows visualization and analyses of complex relationships between risks, risk mitigation tasks, design needs, and PIRTs. Product - Project Risk Allocation Tool and Risk Management System which depict project plan to reduce risk and current progress in doing so.

  10. Assessing Risk and Driving Risk Mitigation for First-of-a-Kind Advanced Reactors

    Energy Technology Data Exchange (ETDEWEB)

    John W. Collins

    2011-09-01

    . Product - Risk Handling Strategy. STEP 4 - Residual Risk Work off The risk handling strategy is entered into the Project Risk Allocation Tool (PRAT) to analyze each task for its ability to reduce risk. The result is risk-informed task prioritization. The risk handling strategy is captured in the Risk Management System, a relational database that provides conventional database utility, including data maintenance, archiving, configuration control, and query ability. The tool's Hierarchy Tree allows visualization and analyses of complex relationships between risks, risk mitigation tasks, design needs, and PIRTs. Product - Project Risk Allocation Tool and Risk Management System which depict project plan to reduce risk and current progress in doing so.

  11. Risk Management in the Implementation of Smart Building Projects

    Directory of Open Access Journals (Sweden)

    Kankhva Vadim

    2017-01-01

    Full Text Available This article contains the results of a study of the risk control structure in the implementation of smart building projects, which are presented herein in the form of an operational risk management mechanism developed by the author and an improved definition of the risk management system. The mechanism is developed based on the analysis of a review of the current state of the construction sector and the existing organizational structures of construction companies, as well as based on the identification of new necessary functions and objectives of risk management systems. The results of the study can be used in the process of development and integration of risk management systems by the existing construction companies specialized in the construction of smart buildings.

  12. Multi-site risk-based project planning, optimization, sequencing and budgeting process and tool for the integrated facility disposition project - 59394

    International Nuclear Information System (INIS)

    Nelson, Jerel; Castillo, Carlos; Huntsman, Julie; Lucek, Heather; Marks, Tim

    2012-01-01

    Document available in abstract form only. Full text of publication follows: Faced with the DOE Complex Transformation, NNSA was tasked with developing an integrated plan for the decommissioning of over 400 facilities and 300 environmental remediation units, as well as the many reconfiguration and modernization projects at the Oak Ridge National Laboratory (ORNL) and Y-12 Complex. Manual scheduling of remediation activities is time-consuming, labor intensive, and inherently introduces bias and unaccounted for aspects of the scheduler or organization in the process. Clearly a tool was needed to develop an objective, unbiased baseline optimized project sequence and schedule with a sound technical foundation for the Integrated Facility Disposition Project (IFDP). In generating an integrated disposition schedule, each project (including facilities, environmental sites, and remedial action units) was identified, characterized, then ranked relative to other projects. Risk matrices allowed for core project data to be extrapolated into probable contamination levels, relative risks to the public, and other technical and risk parameters to be used in the development of an overall ranking. These matrices ultimately generated a complete data set that were used in the Ranking and Sequencing Model (RSM), commonly referred to as the SUPER model, for its numerous abilities to support D and D planning, prioritization, and sequencing

  13. Project finance risk evaluation of the Electric power industry of Serbia

    International Nuclear Information System (INIS)

    Makajic Nikolic, Dragana; Jednak, Sandra; Benkovic, Sladana; Poznanic, Vladimir

    2011-01-01

    From the aspect of the development of a country, the energy sector represents a domain of strategic interest. Generation and use of energy resources most often belongs to the public sector, and are most often under the influence of the government in most countries. This paper analyzes the risks that are characteristic to the business of the public enterprise, Electric Power Industry of Serbia (EPS). EPS has started its restructuring and is adjusting to changes and challenges imposed by the launched reforms in the energy sector. However, due to certain limitations, it is still not possible to implement its complete restructuring and modernization. The paper aims to point at the risks a potential strategic partner faces. The risks have been identified as commercial, financial and political, classification immanent for project finance, and their evaluation was done using Failure Mode and Effects Analysis (FMEA). Risk analysis was performed based on current conditions for two potential scenarios that predict different types of changes in the analyzed period. The results of the analysis show that the potential strategic partner should pay special attention to price risks, estimation, investments, project activity neglect, quasi-risks and debt collection. - Highlights: → Paper analyze all risks characteristic for business running of the public enterprise EPS. → Potential strategic partner faces with the commercial, financial and political risks. → Risk analysis was done using FMEA. → Results are indicating high risk of investing in EPS. → The highest risks are commercial risks, especially price risks.

  14. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    International Nuclear Information System (INIS)

    Lee, Kwang Ho; Roh, Myung Sub

    2013-01-01

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors

  15. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kwang Ho; Roh, Myung Sub [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2013-10-15

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors.

  16. Yield risks in global maize markets: Historical evidence and projections in key regions of the world

    Directory of Open Access Journals (Sweden)

    Nelson B. Villoria

    2018-03-01

    Full Text Available Simultaneous worldwide crop failures stemming from a more unstable climate may reduce the scope for international trade to compensate food shortages and stabilize food prices across the various regions of the world. Understanding the effects of changes in crop productivity on global markets requires knowledge about the extent to which crop yields may be systematically related across producing and consuming centers. This short communication contributes to this knowledge by investigating the potential changes in the strength of two key sources of supply risks in global maize markets: yield variance and cross-country yield correlation. We focus on the largest producing and consuming countries of the world. We capitalize on yield projections from the Global Gridded Crop Model Intercomparison project. Exploratory analysis of the skill of the underlying GGCMI models in reproducing key moments of the distribution of observed yields reveals that they overstate observed variances but faithfully reproduce observed patterns of cross-country correlations. We find no evidence of an increase in the degree of cross-country dependency of maize yields. We also find a higher incidence of what would be considered extremely low maize yields by present-time standards stemming from the projected downward trend in yields levels toward mid-century. The weak dependency of maize yields across countries, an the possibility of reducing the higher incidence of extremes through policies aimed to reverse the climate-induced downward trends in yields, suggest that international trade can become a valuable tool to ameliorate the effects of more unstable crop yields. Keywords: Extremely low yields, Maize markets, Food prices, Agricultural yields, Systemic risk in agriculture, Global agriculture, AgMIP, Global gridded crop model intercomparison

  17. Risk analysis for construction and operation of gas pipeline projects in pakistan

    International Nuclear Information System (INIS)

    Mubin, S.; Mubin, G.

    2008-01-01

    In order to cater for its high energy demand, Pakistan is planning to import natural gas through pipelines from neighboring countries. For fully utilizing the imported gas, providing it to end customers, the infrastructure of gas pipeline needs to be developed. Therefore, huge investment has been done and proposed in this sector in coming future. Considering geological, topographical, geopolitical and climatic conditions of the country, there is added risk of earthquake, landslides and floods. Due to current geopolitical situation there is a persistent threat of unrest and terrorism in the country. Instable Government policies, high rate of inflation, rapid change in material prices are also important risk factors. All these factors make the situation very complex in quantifying the risk especially for a project in which the risk impact factor rises exponentially in case of risk occurrence. In this paper, most appropriate risk classification is made based on technological, organizational, political, natural climatic, security and environmental risk factors. Effort has been made to device a simpler risk management methodology to analyze and manage risks of gas pipeline project. In the proposed risk management model Monte Carlo simulation has been used to identify critical risks. (author)

  18. Risk Management System and Project Staff Education Program for Overseas Construction Project Using the Expert System

    OpenAIRE

    Hirota, Yoichi

    2007-01-01

    The turnover of the Japanese contractors and the consulting firms has kept the same level since 1983, in spite of the fact that the size of domestic market is shrinking. This is why they do not have a proper management system, especially risk management system for the overseas construction projects. This study aims at building risk management system and developing education program that can be applied to reinforcing the ability, based on the author’s experience. Risk is defined as “uncertain ...

  19. Recognizing Risk-of-Failure in Communication Design Projects

    Science.gov (United States)

    Yee, Joyce; Lievesley, Matthew; Taylor, Louise

    2009-01-01

    The pace of commercial graphic design practice presents very few opportunities to conduct user research after a project's launch. This makes the design team's ability to anticipate and address risks during the design development phase even more important, recognized in the astute observation from Tim Brown, CEO of leading international design…

  20. Assessment of Transport Projects: Risk Analysis and Decision Support

    DEFF Research Database (Denmark)

    Salling, Kim Bang

    2008-01-01

    functions. New research proved that specifically two impacts stood out in transport project assessment, namely, travel time savings and construction costs. The final concern of this study has been the fitting of distributions, e.g. by the use of data from major databases developed in which Optimism Bias...... choosing probability distributions and performing real term data fits. The perspective of this Ph.D. study presents newer and better understanding of assigning risks within assessment of transport projects....

  1. Acute Radiation Risk and BRYNTRN Organ Dose Projection Graphical User Interface

    Science.gov (United States)

    Cucinotta, Francis A.; Hu, Shaowen; Nounu, Hateni N.; Kim, Myung-Hee

    2011-01-01

    The integration of human space applications risk projection models of organ dose and acute radiation risk has been a key problem. NASA has developed an organ dose projection model using the BRYNTRN with SUM DOSE computer codes, and a probabilistic model of Acute Radiation Risk (ARR). The codes BRYNTRN and SUM DOSE are a Baryon transport code and an output data processing code, respectively. The risk projection models of organ doses and ARR take the output from BRYNTRN as an input to their calculations. With a graphical user interface (GUI) to handle input and output for BRYNTRN, the response models can be connected easily and correctly to BRYNTRN. A GUI for the ARR and BRYNTRN Organ Dose (ARRBOD) projection code provides seamless integration of input and output manipulations, which are required for operations of the ARRBOD modules. The ARRBOD GUI is intended for mission planners, radiation shield designers, space operations in the mission operations directorate (MOD), and space biophysics researchers. BRYNTRN code operation requires extensive input preparation. Only a graphical user interface (GUI) can handle input and output for BRYNTRN to the response models easily and correctly. The purpose of the GUI development for ARRBOD is to provide seamless integration of input and output manipulations for the operations of projection modules (BRYNTRN, SLMDOSE, and the ARR probabilistic response model) in assessing the acute risk and the organ doses of significant Solar Particle Events (SPEs). The assessment of astronauts radiation risk from SPE is in support of mission design and operational planning to manage radiation risks in future space missions. The ARRBOD GUI can identify the proper shielding solutions using the gender-specific organ dose assessments in order to avoid ARR symptoms, and to stay within the current NASA short-term dose limits. The quantified evaluation of ARR severities based on any given shielding configuration and a specified EVA or other mission

  2. Current industrial practice of managing risks in product development project portfolios

    DEFF Research Database (Denmark)

    Weng, R.; Oehmen, Josef; Ben-Daya, M.

    2013-01-01

    Managing portfolios of development and engineering projects currently presents significant challenges to companies. This is even more the case in the management of portfolio risks, where both industry and academia currently lack a clear conceptual understanding of what portfolio risks are and what...

  3. Mapping cumulative environmental risks: examples from the EU NoMiracle project

    NARCIS (Netherlands)

    Pistocchi, A.; Groenwold, J.; Lahr, J.; Loos, M.; Mujica, M.; Ragas, A.M.J.; Rallo, R.; Sala, S.; Schlink, U.; Strebel, K.; Vighi, M.; Vizcaino, P.

    2011-01-01

    We present examples of cumulative chemical risk mapping methods developed within the NoMiracle project. The different examples illustrate the application of the concentration addition (CA) approach to pesticides at different scale, the integration in space of cumulative risks to individual organisms

  4. The Strategic Risk Management at Different Stages of Innovation Project

    OpenAIRE

    Pysmak Viktoriia O.

    2017-01-01

    This article considers the theoretical principles of the strategic risk management at every stage of innovation project. Relevance of the selected area of research has been substantiated in view of the necessity to provide the theoretical and practical foundations for the strategic risk management of innovation activity. Principles of management of innovation at a contemporary enterprise have been allocated. Analysis of such concepts as «risk», «innovation», «strategic management» was carried...

  5. Risk management in methodologies of information technology and communications projects

    Directory of Open Access Journals (Sweden)

    Jonathan Carrillo

    2013-12-01

    Full Text Available (Received: 2013/10/02 - Accepted: 2013/12/13At present there are methodologies that have several alternatives and methods to manage projects of Information and Communication Technologies. However, these do not cover a solution for the technology events that can occur in the industry, government, education, among others. In the technology market there are several models to identify and analyze risks according to relevant aspects of their area of specialty e.g. projects, in software development, communications, information security and business alignment. For this reason, this research conducted an evaluation of risk management activities of the methodologies used mostly to know which of them includes more correspondence with basic elements of IT using a rating scale.

  6. Reducing volcanic risk on Fogo Volcano, Cape Verde, through a participatory approach: which outcome?

    Science.gov (United States)

    Texier-Teixeira, P.; Chouraqui, F.; Perrillat-Collomb, A.; Lavigne, F.; Cadag, J. R.; Grancher, D.

    2014-09-01

    This research paper presents the outcomes of Work Package 5 (socio-economical vulnerability assessment and community-based disaster risk reduction) of the MIAVITA (MItigate and Assess risk from Volcanic Impact on Terrain and human Activities) research programme conducted on Fogo Volcano, Cape Verde. The study lasted for almost 3 years (May 2010 to January 2012), of which most of the time was spent in the village of Chã das Caldeiras, situated within the 9 km wide caldera of the volcano inside Fogo Natural Park. The objectives of the programme included assessment of the vulnerability of the community at risk in terms of livelihoods, access to resources, and power relations between the local people and the different public and private institutions. These are important factors that need to be investigated in order to understand the root causes of vulnerability of the local people. This case study shows that the voluntary exposure of people to volcanic threats is linked to daily access to sources of livelihood, especially agriculture and tourism. This is despite the perception of people of the risk to their lives and properties. In order to counter the factors of vulnerability, the study also aimed to identify and enhance local capacities. To achieve such an objective, a participatory three-dimensional mapping (P3DM) activity was conducted to facilitate the dialogue between the local people and the different stakeholders as well as to prepare plans and measures to reduce volcanic risk. The P3DM was a half success considering that it has not yet led to an operational plan which takes into account the local capacities. The main reasons included (1) the non-participatory aspect of the project at the beginning which should have identified priorities for people and let them lead the project to ensure the sustainability of (2) deep conflicts within the community which complicated the focus group discussions around the 3-D map, and the difficulties in involving more

  7. Risk Identification and Assessment in PPP Infrastructure Projects using Fuzzy Analytical Hierarchy Process and Life-Cycle Methodology

    Directory of Open Access Journals (Sweden)

    Jie Li

    2012-11-01

    Full Text Available To fulfil the increasing demands of the public,Public Private Partnership (PPP has beenincreasingly used to procure infrastructureprojects, such as motor ways, bridges, tunnelsand railways. However, the risks involved inPPP projects are unique and dynamic due tolarge amount of investment and longconcession period. This paper aims to developa risk identification framework from theperspectives of project life cycle, and anassessment framework for risks associatedwith PPP project using fuzzy analyticalhierarchy process (AHP. First the paperreviews the current literature to identifycommon risks in PPP infrastructure projectsand classification methods used. The risksidentified from the literature were classifiedusing project life cycle perspectives. Followingthat, the paper presents the advantages offuzzy AHP. Furthermore, the paper provides aframework for assessment of risks in PPPprojects followed by an illustrative examplewhere the data was obtained from surveyquestionnaires. The paper concludes that risksassociated in PPP infrastructure projects areunique and therefore it is beneficial to classifythem from project life cycle perspectives, andthe proposed fuzzy AHP method is suitable forthe assessment of these risks.

  8. Meta-analysis: Does garlic intake reduce risk of gastric cancer?

    Science.gov (United States)

    Kodali, R T; Eslick, Guy D

    2015-01-01

    In the past 2 decades, various epidemiological studies investigated whether garlic can positively modify the risk of gastric cancer. Garlic contains numerous sulfide compounds, including diallyl trisulfide, which have anticarcinogenic properties. We conducted a meta-analysis to determine if garlic intake reduces the risk of gastric cancer. An electronic search of MEDLINE, PubMed, and EMBASE to June 2014 was completed. There were 14 case control studies, 2 randomized controlled studies, and 1 cohort study that fulfilled our inclusion criteria. We used a random effects model to calculate pooled odds ratios (OR) and 95% confidence intervals (CIs) for risk of gastric cancer with garlic consumption. Meta-analysis of a total of 8,621 cases and 14,889 controls was conducted. Significant variability in duration of garlic intake and reference categories for amount of intake was noted. High, low, and any garlic intake were all associated with reduced risk of gastric cancer. High intake had the most significant risk reduction, OR = 0.49 (95% CI: 0.38-0.62). Heterogeneity was low (I² = 30.85, P = 0.17). A more modest risk reduction was associated with low intake, OR = 0.75 (95% CI: 0.58-0.97). Half of the studies did not separate garlic intake into high or low amounts, intake was only noted as consumption vs. non-consumption. Any amount of consumption still showed a risk reduction similar to low intake, OR = 0.77 (95% CI: 0.60-1.00). Low and any amount of consumption showed moderate heterogeneity (58% and 45%, respectively). Garlic intake appears to be associated with reduced risk of gastric cancer. Further high quality studies are required to confirm this finding and to assess the amount of garlic that needs to be consumed for protective effect.

  9. RISK ANALYSIS FOR SHIP CONVERTING PROJECT ACCOMPLISHMENT (Case study of KRI KP Converting Project

    Directory of Open Access Journals (Sweden)

    Dimas Endro W

    2013-10-01

    Full Text Available Ship converting has become as prospective activity in ship building area. Operational and economical aspect are the most dominant rationale. Baseon a new fuction of converted ship, a task list which contain several jobs that must be done is listed. This accomplishment schedule not only contain a task list, but also duration for certain job title. In practical apllication job duration is maintained based on experience of project manager.  Further more, total accomplish duration is setted as time accomplishment for the project. This setted time has become reference for the project bid. Occasionaly, if accomplishment time which offered is strict, than schedule slip become as potencial nightmare. For this situation, project manager has had a cristal clearconsideration to select a proper decision wheter he will take the tender offer or not. practically, project mananger has layed on his experience to handle previous project and face  penalty if the project delayed. This paper focussed on how to measure tender offer based on risk analysis, specially for converted ship tender which has a strike time accomplishment.A new application method to analysis proposed tender based on time and penalty parameter has become a topic of this paper.

  10. Evaluation and financial risk management of urban renewal projects in partnership with public and private

    Directory of Open Access Journals (Sweden)

    Ehsan Hassani

    2011-10-01

    Full Text Available Financing plays an important role for renewal of old city building is find suitable financing plan. A proper financial management in one hand has a direct relationship with project main factors such as: time, cost and quality of the project, and on the other hand, achieving project goals requires a comprehensive insight of project, stockholders as well as other relative situation in regard with the project. Considering the complication of execution such projects and the number of shareholders, one of the best attitudes towards the project management is risk management. This research is a qualitative and practical, which reviews the effects of project management factors on financial return of urban renewal sachem. The required information gained through a survey and via questionnaire and interviews with specialists. This article first describes the public private financial partnership and then, based on the results gained from a case study done on one of the renewal schemes in Mashhad metropolitan areas. Next, it identifies and evaluates of positive and negative risks, which lead to threats and opportunities will be performed and will attempt to respond the existent risks. Finally, we provide a framework for the risk assessment of the housing units.

  11. City of Iqaluit's climate change impacts, infrastructure risks and adaptive capacity project

    International Nuclear Information System (INIS)

    Nielsen, D.; Kronenberger, J.

    2007-03-01

    The City of Iqaluit is an Arctic community that is very susceptible to the stresses of climate change. The city is challenged by increased flooding, coastal erosion and ground instability caused by melting of the permafrost layer. In response, the City of Iqaluit has created policies to reduce greenhouse gases and act on climate change. A project has also been launched to develop adaptation strategies, with particular focus on infrastructure vulnerability given the environmental and climate change in the Canadian Arctic. The purpose of the study is to evaluate the biophysical exposure and hazards on Arctic coasts subject to effects of climate change, identify past and current management strategies used to manage risks in coastal communities which have already experienced environmental change, and to evaluate the adaptive capacity of communities for dealing with coastal hazards throughout the Arctic. This document identified the risks to Iqaluit's infrastructure, including buildings, roads, water supply, wastewater treatment and waste disposal systems. Adaptation options were also developed. These ranged from educational programs and retrofits to policy changes and building standard amendments. refs., tabs., figs

  12. Allocating risk capital for a brownfields redevelopment project under hydrogeological and financial uncertainty.

    Science.gov (United States)

    Yu, Soonyoung; Unger, Andre J A; Parker, Beth; Kim, Taehee

    2012-06-15

    In this study, we defined risk capital as the contingency fee or insurance premium that a brownfields redeveloper needs to set aside from the sale of each house in case they need to repurchase it at a later date because the indoor air has been detrimentally affected by subsurface contamination. The likelihood that indoor air concentrations will exceed a regulatory level subject to subsurface heterogeneity and source zone location uncertainty is simulated by a physics-based hydrogeological model using Monte Carlo realizations, yielding the probability of failure. The cost of failure is the future value of the house indexed to the stochastic US National Housing index. The risk capital is essentially the probability of failure times the cost of failure with a surcharge to compensate the developer against hydrogeological and financial uncertainty, with the surcharge acting as safety loading reflecting the developers' level of risk aversion. We review five methodologies taken from the actuarial and financial literature to price the risk capital for a highly stylized brownfield redevelopment project, with each method specifically adapted to accommodate our notion of the probability of failure. The objective of this paper is to develop an actuarially consistent approach for combining the hydrogeological and financial uncertainty into a contingency fee that the brownfields developer should reserve (i.e. the risk capital) in order to hedge their risk exposure during the project. Results indicate that the price of the risk capital is much more sensitive to hydrogeological rather than financial uncertainty. We use the Capital Asset Pricing Model to estimate the risk-adjusted discount rate to depreciate all costs to present value for the brownfield redevelopment project. A key outcome of this work is that the presentation of our risk capital valuation methodology is sufficiently generalized for application to a wide variety of engineering projects. Copyright © 2012 Elsevier

  13. The impact of the human genome project on risk assessment

    International Nuclear Information System (INIS)

    Katarzyna Doerffer; Paul Unrau.

    1996-01-01

    The radiation protection approach to risk assessment assumes that cancer induction following radiation exposure is purely random. Present risk assessment methods derive risk from cancer incidence frequencies in exposed populations and associate disease outcomes totally with the level of exposure to ionizing red aeon. Exposure defines a risk factor that affects the probability of the disease outcome. But cancer risk can be affected by other risk factors such as underlying genetic factors (predisposition) of the exposed organism. These genetic risk factors are now becoming available for incorporation into ionizing radiation risk assessment Progress in the Human Genome Project (HOP) will lead to direct assays to measure the effects of genetic risk determinants in disease outcomes. When all genetic risk determinants are known and incorporated into risk assessment it will be possible to reevaluate the role of ionizing radiation in the causation of cancer. (author)

  14. Reducing sequence risk using trend following and the CAPE ratio

    OpenAIRE

    Clare, A.; Thomas, S.; Smith, P. N.; Seaton, J.

    2017-01-01

    The risk of experiencing bad investment outcomes at the wrong time, or sequence risk, is a poorly understood, but crucial aspect of the risk faced by investors, in particular those in the decumulation phase of their savings journey, typically over the period of retirement financed by a defined contributions pension scheme. Using US equity return data from 1872-2014 we show how this risk can be significantly reduced by applying trend-following investment strategies. We also demonstrate that kn...

  15. Statistically downscaled climate projections to support evaluating climate change risks for hydropower

    International Nuclear Information System (INIS)

    Brekke, L.

    2008-01-01

    This paper described a web-served public access archive of down-scaled climate projections developed as a tool for water managers of river and hydropower systems. The archive provided access to climate projection data at basin-relevant resolution and included an extensive compilation of down-scale climate projects designed to support risk-based adaptation planning. Downscaled translations of 112 contemporary climate projections produced using the World Climate Research Program's coupled model intercomparison project were also included. Datasets for the coupled model included temperature and precipitation, monthly time-steps, and geographic coverage for the United States and portions of Mexico and Canada. It was concluded that the archive will be used to develop risk-based studies on shifts in seasonal patterns, changes in mean annual runoff, and associated responses in water resources and hydroelectric power management. Case studies demonstrating reclamation applications of archive content and potential applications for hydroelectric power production impacts were included. tabs., figs

  16. Risk management, financial evaluation and funding for wastewater and stormwater reuse projects.

    Science.gov (United States)

    Furlong, Casey; De Silva, Saman; Gan, Kein; Guthrie, Lachlan; Considine, Robert

    2017-04-15

    This paper has considered risk management, financial evaluation and funding in seven Australian wastewater and stormwater reuse projects. From the investigated case studies it can be seen that responsible parties have generally been well equipped to identify potential risks. In relation to financial evaluation methods some serious discrepancies, such as time periods for analysis, and how stormwater benefits are valued, have been identified. Most of the projects have required external, often National Government, funding to proceed. As National funding is likely to become less common in the future, future reuse projects may need to be funded internally by the water industry. In order to enable this the authors propose that the industry requires (1) a standard project evaluation process, and (2) an infrastructure funders' forum (or committee) with representation from both utilities and regulators, in order to compare and prioritise future reuse projects against each other. Copyright © 2017 Elsevier Ltd. All rights reserved.

  17. RISK MANAGEMENT IN THE OPERATING ACTIVITIES OF AN ENTERPRISE AND IN PUBLIC-PRIVATE PARTNERSHIP PROJECTS

    Directory of Open Access Journals (Sweden)

    Lech Jędrzejewski

    2017-03-01

    Full Text Available The paper is devoted to issues related to building a risk management system for businesses in the areas of operations and implementation of infrastructure projects. The article defines the concept of risk in business processes and identifies risks occurring in infrastructure projects. In the text, the principles have been presented for protection against the effects of political, contracting, environmental, ecological, product, process, operational and personnel risk.

  18. Cities at risk: status of Italian planning system in reducing seismic and hydrogeological risks

    Directory of Open Access Journals (Sweden)

    Grazia Di Giovanni

    2016-03-01

    Full Text Available Italy and its urban systems are under high seismic and hydrogeological risks. The awareness about the role of human activities in the genesis of disasters is achieved in the scientific debate, as well as the role of urban and regional planning in reducing risks. The paper reviews the state of Italian major cities referred to hydrogeological and seismic risk by: 1 extrapolating data and maps about seismic hazard and landslide risk concerning cities with more than 50.000 inhabitants and metropolitan contexts, and 2 outlining how risk reduction is framed in Italian planning system (at national and regional levels. The analyses of available data and the review of the normative framework highlight the existing gaps in addressing risk reduction: nevertheless a wide knowledge about natural risks afflicting Italian territory and an articulated regulatory framework, the available data about risks are not exhaustive, and risk reduction policies and multidisciplinary pro-active approaches are only partially fostered and applied.

  19. The Process of Risk Management for a Project to Extract Shale Gas

    Energy Technology Data Exchange (ETDEWEB)

    Hurtado, A.; Eguilior, S.; Recreo, F.

    2014-07-01

    There is no human activity without risk. Accordingly, so neither is the extraction of shale gas. In fact this technology has a risk level similar to any other type of industrial activity and particularly those related to oil and gas industry. It is important to highlight the need to properly address these risks, among other reasons, for its influence on public acceptance of this technology, a key element for the commercial scale implementation. At present, risk management is a generally accepted tool for decision making and control of the risks that come from a wide variety of both industrial and not industrial human activities. It is an important element for the implementation of a large number of safety regulations, corporate policies and good industry practice . Thus, for example, chemical and petroleum, nuclear industries, aviation and aerospace or waste management make use of risk management as a central tool to identification the risks, to establish the importance and ranking of the estimated risks, to estimate the cost/benefit ratio in reducing these risks, and to carry out political and institutional processes to manage them. Risk management provides a broad framework to aid decision-making through the identification, analysis, and evaluation and control of risks, including, of course, those for health and safety. A key aspect is the need to ensure the identification of all significant risks, from which it may take appropriate measures (risk analysis). An unidentified risk allows or evaluation or its monitoring, reduction, acceptance or cancellation. After the analysis stage it may be considered for assessment, that is, the risk quantification, to classify them (acceptable, unacceptable, etc. risk). These actions are determined based on a balance between risk control strategies, their effectiveness and cost, and the needs, problems and concerns of those who may be affected, or stake holders, an essential element in the strategic planning of any activity or

  20. The Process of Risk Management for a Project to Extract Shale Gas

    International Nuclear Information System (INIS)

    Hurtado, A.; Eguilior, S.; Recreo, F.

    2014-01-01

    There is no human activity without risk. Accordingly, so neither is the extraction of shale gas. In fact this technology has a risk level similar to any other type of industrial activity and particularly those related to oil and gas industry. It is important to highlight the need to properly address these risks, among other reasons, for its influence on public acceptance of this technology, a key element for the commercial scale implementation. At present, risk management is a generally accepted tool for decision making and control of the risks that come from a wide variety of both industrial and not industrial human activities. It is an important element for the implementation of a large number of safety regulations, corporate policies and good industry practice . Thus, for example, chemical and petroleum, nuclear industries, aviation and aerospace or waste management make use of risk management as a central tool to identification the risks, to establish the importance and ranking of the estimated risks, to estimate the cost/benefit ratio in reducing these risks, and to carry out political and institutional processes to manage them. Risk management provides a broad framework to aid decision-making through the identification, analysis, and evaluation and control of risks, including, of course, those for health and safety. A key aspect is the need to ensure the identification of all significant risks, from which it may take appropriate measures (risk analysis). An unidentified risk allows or evaluation or its monitoring, reduction, acceptance or cancellation. After the analysis stage it may be considered for assessment, that is, the risk quantification, to classify them (acceptable, unacceptable, etc. risk). These actions are determined based on a balance between risk control strategies, their effectiveness and cost, and the needs, problems and concerns of those who may be affected, or stake holders, an essential element in the strategic planning of any activity or

  1. Reduced risk of UC in families affected by appendicitis

    DEFF Research Database (Denmark)

    Nyboe Andersen, Nynne; Gørtz, Sanne; Frisch, Morten

    2017-01-01

    OBJECTIVE: The possible aetiological link between appendicitis and UC remains unclear. In order to investigate the hereditary component of the association, we studied the risk of UC in family members of individuals with appendicitis. DESIGN: A cohort of 7.1 million individuals was established...... million person-years of follow-up between 1977 and 2011, a total of 190 004 cohort members developed appendicitis and 45 202 developed UC. Individuals having a first-degree relative with appendicitis before age 20 years had significantly reduced risk of UC (RR 0.90; 95% CI 0.86 to 0.95); this association...... was stronger in individuals with a family predisposition to UC (RR 0.66; 95% CI 0.51 to 0.83). CONCLUSIONS: Individuals with a first-degree relative diagnosed with appendicitis before age 20 years are at reduced risk of UC, particularly when there is a family predisposition to UC. Our findings question...

  2. OPPORTUNITIES AND RISKS IN A CONTROL SYSTEM OF INNOVATIVE PROJECTS OF ORGANIZATIONAL DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    A.V. Grebenkin

    2008-06-01

    Full Text Available The definition of the organizational development innovative project and the technique of its estimation is in this article offered. The distinctive special feature of this method is comparison of opportunities and risks by means of essentially new system of the parameters. These parameters allow to receive a complex estimation of a condition of organizational development innovative projects. Approbation of the offered estimated technique has been lead on set of organizational development innovative projects which were realized at the enterprises of a various branch accessory. The hypothesis about necessity of definition of a condition of the project by means of an estimation of opportunities and their comparisons to risks is confirmed.

  3. Indirect risk effects reduce feeding efficiency of ducks during spring.

    Science.gov (United States)

    Behney, Adam C; O'Shaughnessy, Ryan; Eichholz, Michael W; Stafford, Joshua D

    2018-01-01

    Indirect risk effects of predators on prey behavior can have more of an impact on prey populations than direct consumptive effects. Predation risk can elicit more vigilance behavior in prey, reducing the amount of time available for other activities, such as foraging, which could potentially reduce foraging efficiency. Understanding the conditions associated with predation risk and the specific effects predation risk have on prey behavior is important because it has direct influences on the profitability of food items found under various conditions and states of the forager. The goals of this study were to assess how ducks perceived predation risk in various habitat types and how strongly perceived risk versus energetic demand affected foraging behavior. We manipulated food abundance in different wetland types in Illinois, USA to reduce confounding between food abundance and vegetation structure. We conducted focal-animal behavioral samples on five duck species in treatment and control plots and used generalized linear mixed-effects models to compare the effects of vegetation structure versus other factors on the intensity with which ducks fed and the duration of feeding stints. Mallards fed more intensively and, along with blue-winged teal, used longer feeding stints in open habitats, consistent with the hypothesis that limited visibility was perceived to have a greater predation risk than unlimited visibility. The species temporally nearest to nesting, wood ducks, were willing to take more risks for a greater food reward, consistent with an increase in a marginal value of energy as they approached nesting. Our results indicate that some duck species value energy differently based on the surrounding vegetation structure and density. Furthermore, increases in the marginal value of energy can be more influential than perceived risk in shaping foraging behavior patterns. Based on these findings, we conclude that the value of various food items is not solely

  4. Cigarette smoking risk-reducing beliefs: Findings from the United States Health Information National Trends Survey.

    Science.gov (United States)

    Kaufman, Annette R; Coa, Kisha I; Nguyen, Anh B

    2017-09-01

    Cigarette smoking risk-reducing beliefs are ideas that certain health promoting behaviors (e.g., exercise) may mitigate the risks associated with smoking. The objective of this study was to describe smoking risk-reducing beliefs and the belief that quitting can reduce the harmful effects of smoking among the U.S. adult population and the associations between these beliefs, current smoking status, and sociodemographics. Data were from the Health Information National Trends Survey 4 (HINTS 4) Cycles 3 and 4 (2013-2014; N=6862). Descriptive analyses were conducted to examine bivariate associations among the quit smoking belief, smoking risk-reducing beliefs, and covariates. Weighted ordinal logistic regression models examined the adjusted associations between smoking status and sociodemographics, with quit smoking belief and risk-reducing beliefs. Eighty-two percent of the population reported that quitting cigarette smoking can help reduce the harmful effects of smoking a lot: former smokers and individuals with higher educational attainment were more likely to endorse this belief than never smokers and those with lower educational attainment. Many people endorsed smoking risk-reducing beliefs about exercise (79.3%), fruits and vegetables (71.8%), vitamins (67.2%), and sleep (68.5%). Former smokers were less likely to subscribe to these beliefs than never smokers. Vulnerable populations who may be most at risk of smoking attributable morbidity and mortality were more likely to endorse risk-reducing beliefs. Future studies are needed to better understand how risk-reducing beliefs are formed and if modifying these beliefs may help to reduce cigarette smoking in the U.S. Published by Elsevier Inc.

  5. Risk level project. Summary report, Norwegian Shelf, Phase 7; Risikonivaaprosjektet. Sammendragsrapport Norsk Sokkel, fase 7

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-04-15

    The project 'developments in risk level - Norwegian shelf', also known as the risk level project, was initiated by the Norwegian Petroleum Directorate in 2000. From 2004 the project has been continued by Petroleum Safety Authority Norway. The project's main objectives are to measure the effect of the health, security and environment (HSE) work in the industry, and contribute to identify the areas critical to HSE, where efforts must be made to prevent unwanted events or accidents. A summary report with results from phase 7 in the project (ml)

  6. How do women at increased breast cancer risk perceive and decide between risks of cancer and risk-reducing treatments? A synthesis of qualitative research.

    Science.gov (United States)

    Fielden, Hannah G; Brown, Stephen L; Saini, Pooja; Beesley, Helen; Salmon, Peter

    2017-09-01

    Risk-reducing procedures can be offered to people at increased cancer risk, but many procedures can have iatrogenic effects. People therefore need to weigh risks associated with both cancer and the risk-reduction procedure in their decisions. By reviewing relevant literature on breast cancer (BC) risk reduction, we aimed to understand how women at relatively high risk of BC perceive their risk and how their risk perceptions influence their decisions about risk reduction. Synthesis of 15 qualitative studies obtained from systematic searches of SCOPUS, Web of Knowledge, PsychINFO, and Medline electronic databases (inception-June 2015). Women did not think about risk probabilistically. Instead, they allocated themselves to broad risk categories, typically influenced by their own or familial experiences of BC. In deciding about risk-reduction procedures, some women reported weighing the risks and benefits, but papers did not describe how they did so. For many women, however, an overriding wish to reduce intense worry about BC led them to choose aggressive risk-reducing procedures without such deliberation. Reasoning that categorisation is a fundamental aspect of risk perception, we argue that patients can be encouraged to develop more nuanced and accurate categorisations of their own risk through their interactions with clinicians. Empirically-based ethical reflection is required to determine whether and when it is appropriate to provide risk-reduction procedures to alleviate worry. © 2016 The Authors. Psycho-Oncology Published by John Wiley & Sons Ltd.

  7. Project alliancing in the offshore industry

    International Nuclear Information System (INIS)

    Halman, J.I.M.; Braks, B.F.M.

    1999-01-01

    In this paper the shift towards new types of project organisation within the offshore industry is explained and discussed. Special focus is given to the organisational concept of project alliancing. The principles, structure and culture of a project alliance as applied within the offshore industry are described. In the paper the organisational concept of project alliancing is discussed on its potential to reduce project costs and enhance profits, both for the operator (oil and gas company) as well as for participating contractors. A risk and reward mechanism developed to share project risks and rewards between allied parties is explained for an alliance case. Based upon an in-depth study carried out within a contractor company in the offshore industry the organisational and financial implications of project alliancing are presented. (author)

  8. Balancing risk in regulatory decision making: the Port Granby Project case study

    International Nuclear Information System (INIS)

    Benitez, L.; Kleb, H.

    2011-01-01

    The purpose of this paper is to review the trade-offs that are routinely considered in regulatory decision making, and the policy basis and methods for making those trade-offs. Regulatory decisions under the Canadian Environmental Assessment Act (CEAA) and the Nuclear Safety and Control Act (NSCA) normally consider potential risks to the environment, human health and safety, if a project were to proceed. There is only limited consideration, under such circumstances, of the risks to the environment, human health and safety if the project were not to proceed. The focus is on the potential adverse effects of the project, except in the event of an emergency, where the focus shifts to the economic and other beneficial effects. The Port Granby long-term low-level radioactive waste management project is a project to clean up and provide appropriate local, long-term management of historic low-level radioactive waste (LLRW) in the Port Granby, Ontario area. Approximately 0.4 M m 3 of LLRW, presently located at the Port Granby Waste Management Facility, is to be transported to a newly constructed long-term waste management facility ~700 m north of the bluff face where the facility is located. Accordingly, the project is subject to environmental assessment and licensing processes under the CEAA and the NSCA, respectively. While the Port Granby Project does not represent an emergency situation, it does represent a situation that could result in a significant degree of environmental risk if the project were not to proceed. Over the course of the various studies that have been undertaken at the Waste Management Facility, it has become apparent that the facility is subject to erosion and gullying along the bluff face. The potential for the leaching of contaminants from the existing facility and the erosion of the Lake Ontario bluffs are recognized as ongoing risks that will continue and potentially worsen if the project does not proceed. The economic and other considerations that

  9. Modelling of risk events with uncertain likelihoods and impacts in large infrastructure projects

    DEFF Research Database (Denmark)

    Schjær-Jacobsen, Hans

    2010-01-01

    to prevent future budget overruns. One of the central ideas is to introduce improved risk management processes and the present paper addresses this particular issue. A relevant cost function in terms of unit prices and quantities is developed and an event impact matrix with uncertain impacts from independent......This paper presents contributions to the mathematical core of risk and uncertainty management in compliance with the principles of New Budgeting laid out in 2008 by the Danish Ministry of Transport to be used in large infrastructure projects. Basically, the new principles are proposed in order...... uncertain risk events is used to calculate the total uncertain risk budget. Cost impacts from the individual risk events on the individual project activities are kept precisely track of in order to comply with the requirements of New Budgeting. Additionally, uncertain likelihoods for the occurrence of risk...

  10. Toward a Stakeholder Perspective on Social Stability Risk of Large Hydraulic Engineering Projects in China: A Social Network Analysis

    Directory of Open Access Journals (Sweden)

    Zhengqi He

    2018-04-01

    Full Text Available In China, large hydraulic engineering projects have made a great contribution to social economic development; at the same time, they also lead to social risks that affect social stability. The pluralism of stakeholders in large hydraulic engineering projects and the complex interrelationship among stakeholders are the important factors affecting social stability risk. Previous studies of social stability risk have mainly focused on risk identification and risk assessment, without considering the relationships among stakeholders and their linkages of risks. For large hydraulic engineering projects, this paper investigated the relevant risk factors and their interrelationships through a literature review and interviews that represented stakeholder perspectives. The key social stability risk factors were identified based on social network analysis. A multi-channel project financial system, a perfect interest compensation mechanism, an efficient prevention mechanism of group events, and a complete project schedule control system were proposed to mitigate the social stability risks. This study combined stakeholder management with risk management by using social network analysis, providing reference for the social stability risk management of large engineering projects in China.

  11. The Ukrainian pilot project “Stop radon”

    Directory of Open Access Journals (Sweden)

    Pavlenko Tatyana

    2014-01-01

    Full Text Available In 2010 one area of Ukraine (Kirovograd area was selected for a pilot project to reduce radon risks. The project consists of several stages: radon risk training for the public health professionals, measurements of radon concentration in schools and nurseries (more than 1000 buildings were examined, justifications of radon countermeasures and their implementation. The lognormal frequency distribution for equivalent equilibrium concentration was authentically established. The geometric mean of the indoor radon equivalent equilibrium concentration was established to 63 Bq/m3, and standard deviation is equal to 82 Bq/m3. The indoor radon equivalent equilibrium concentration ranged from 22 Bq/m3 to 809 Bq/m3. It was found that the national regulatory limit for this type of buildings was exceeded in more than 50% of the cases. The second phase of the project has a goal to remediate radon levels and reduce radon risks. Calculated exposure doses and radon risk were used to justify the remediation and assess the economic loss for the region caused by radon irradiation of the population.

  12. Minimizing risks

    International Nuclear Information System (INIS)

    Thompson, P.

    1991-01-01

    This article discusses ways to reduce the economic risk of independent energy projects. The topics of the article include risk categorization into areas of property, boiler and machinery, business income, and general liability, choosing a broker, choosing an insurer, and helping an insurer develop the best portfolio for the project. The author feels that attention to the guidelines for the right insurance coverage is as vital to a plant's economic stability as attention to the details of the blueprints is to its physical stability

  13. A quality improvement project to reduce the intraoperative use of single-dose fentanyl vials across multiple patients in a pediatric institution.

    Science.gov (United States)

    Buck, David; Subramanyam, Rajeev; Varughese, Anna

    2016-01-01

    The use of a single-dose vial across multiple patients presents a risk to sterility and is against CDC guidelines. We initiated a quality improvement (QI) project to reduce the intraoperative use of single-dose vials of fentanyl across multiple patients at Cincinnati Children's Hospital Medical Center (CCHMC). The initial step of the improvement project was the development of a Key Driver Diagram. The diagram has the SMART aim of the project, key drivers inherent to the process we are trying to improve, and specific interventions targeting the key drivers. The number of patients each week receiving an IV dose of fentanyl, from a vial previously accessed for another patient was tracked in a high turnover operating room (OR). The improvement model used was based on the concept of building Plan-Do-Study-Act (PDSA) cycles. Tests of change included provider education, provision of an increased number of fentanyl vials, alternate wasting processes, and provision of single-use fentanyl syringes by the pharmacy. Prior to initiation of this project, it was common for a single fentanyl vial to be accessed for multiple patients. Our data showed an average percentage of failures of just over 50%. During the end of the project, after 7 months, the mean percentage failures had dropped to 5%. Preparation of 20 mcg single-use fentanyl syringes by pharmacy, combined with education of providers on appropriate use, was successful in reducing failures to below our goal of 25%. Appropriately sized fentanyl syringes prepared by pharmacy, education on correct use of single-dose vials, and reminders in the OR, reduced the percentage of patients receiving a dose of fentanyl from a vial previously accessed for another patient in a high-volume otolaryngology room. © 2015 John Wiley & Sons Ltd.

  14. Causes and remedies for the dominant risk factors in Enterprise System implementation projects: the consultants' perspective.

    Science.gov (United States)

    Lech, Przemysław

    2016-01-01

    The purpose of this research was to investigate the causes of the dominant risk factors, affecting Enterprise System implementation projects and propose remedies for those risk factors from the perspective of implementation consultants. The study used a qualitative research strategy, based on e-mail interviews, semi-structured personal interviews with consultants and participant observation during implementation projects. The main contribution of this paper is that it offers viable indications of how to mitigate the dominant risk factors. These indications were grouped into the following categories: stable project scope, smooth communication supported by the project management, dedicated, competent and decision-making client team, competent and engaged consultant project manager, schedule and budget consistent with the project scope, use of methodology and procedures, enforced and enabled by the project managers, competent and dedicated consultants. A detailed description is provided for each category.

  15. Assessing reservoir performance risk in CO{sub 2} storage projects

    Energy Technology Data Exchange (ETDEWEB)

    Bowden, A.R. [URS Corp., San Francisco, CA (United States); Rigg, A. [CRC for Greenhouse Gas Technologies, Canberra (Australia)

    2005-07-01

    One of the main issues for researchers involved with geological storage of carbon dioxide (CO{sub 2}) has been the development of a proper methodology to assess and compare alternative CO{sub 2} injection projects on the basis of risk. Consideration needs to be given to technical aspects, such as the risk of leakage and the effectiveness of the intended reservoir, as well as less tangible aspects such as the value and safety of geological storage of CO{sub 2}, and potential impacts on the community and environment. The Geological Disposal of Carbon Dioxide (GEODISC), was a research program of the Australian Petroleum Cooperative Research Centre which identified 56 potential environmentally sustainable sites for CO{sub 2} injection (ESSCIs) within Australia. Several studies were carried out, involving detailed evaluation of the suitability of 4 selected sites, including Dongara, Petrel, Gippsland and Carnarvon. The GEODISC program included a risk assessment research module which required a complete and quantified risk assessment of CO{sub 2} injection as a storage option. Primary goals were to assess the risk of leakage, to assess the effectiveness of the intended reservoir, and to assess negative consequences to facilitate comparison of alternative sites. This paper discussed the background and risk assessment model. Key performance indicators (KPIs) were also developed to address the purpose of risk assessment. It was concluded that the RISQUE method is an appropriate approach and that potential injection projects can be measured against six KPIs including containment; effectiveness; self-funding potential; wider community benefits; community safety and community amenity. 6 refs., 3 tabs., 3 figs.

  16. Students in a School Environment: A Project Focused on Family Involvement of At-Risk

    Science.gov (United States)

    Denney, Pat

    2011-01-01

    This project examined family involvement of at risk students in mid-west communities. The purpose of this project was to study the affect of family involvement on at-risk student achievement. The redefining of the perception of America has resulted in a crisis of academic performance in the traditionally slow-changing education systems. This topic…

  17. Determination of risk identification process employed by NHS for a PFI hospital project in the UK

    Directory of Open Access Journals (Sweden)

    F. E. Mohamed Ghazali

    2009-12-01

    Full Text Available Long-term concession contracts associated with Private Finance Initiative (PFI projects, such as National Health Service (NHS hospitals, are subject to substantial risks, which may not only emerge from project activities such as design and construction, but also from global issues beyond the control of project parties, such as commercial, legal and political risks. Therefore, the principal parties involved must manage risks effectively and efficiently, as early as the project initiation stage, in order to ensure a successful delivery. The aim of this paper is to examine the risk identification process of the NHS PFI hospital in the UK, as a case study, in order to determine the techniques used in risk identification, and their significance, based on estimated probabilities of occurrence. These objectives were achieved through interviews with key personnel within the NHS Trust involved. Results found the sole technique used in risk identification to be brainstorming, through which more than thirty risks were identified and classified under six risk categories: planning, pre-commissioning, design, land purchasing, construction and operation. Thirteen risks were identified as significant based on their estimated probability of occurrence had the project been developed via public procurement. The results of this research will enable public sector clients like the NHS Trust to not only identify the significant risks, which will allow them to focus more attention on developing appropriate mitigation strategies and contingency plans, but also to improve its risk identification process through the use of other techniques in order to support findings from the brainstorming process.

  18. Weather Augmented Risk Determination (WARD) System

    Science.gov (United States)

    Niknejad, M.; Mazdiyasni, O.; Momtaz, F.; AghaKouchak, A.

    2017-12-01

    Extreme climatic events have direct and indirect impacts on society, economy and the environment. Based on the United States Bureau of Economic Analysis (BEA) data, over one third of the U.S. GDP can be considered as weather-sensitive involving some degree of weather risk. This expands from a local scale concrete foundation construction to large scale transportation systems. Extreme and unexpected weather conditions have always been considered as one of the probable risks to human health, productivity and activities. The construction industry is a large sector of the economy, and is also greatly influenced by weather-related risks including work stoppage and low labor productivity. Identification and quantification of these risks, and providing mitigation of their effects are always the concerns of construction project managers. In addition to severe weather conditions' destructive effects, seasonal changes in weather conditions can also have negative impacts on human health. Work stoppage and reduced labor productivity can be caused by precipitation, wind, temperature, relative humidity and other weather conditions. Historical and project-specific weather information can improve better project management and mitigation planning, and ultimately reduce the risk of weather-related conditions. This paper proposes new software for project-specific user-defined data analysis that offers (a) probability of work stoppage and the estimated project length considering weather conditions; (b) information on reduced labor productivity and its impacts on project duration; and (c) probabilistic information on the project timeline based on both weather-related work stoppage and labor productivity. The software (WARD System) is designed such that it can be integrated into the already available project management tools. While the system and presented application focuses on the construction industry, the developed software is general and can be used for any application that involves

  19. Medical interventional procedures--reducing the radiation risks

    International Nuclear Information System (INIS)

    Cousins, C.; Sharp, C.

    2004-01-01

    Over the last 40 years, the number of percutaneous interventional procedures using radiation has increased significantly, with many secondary care clinicians using fluoroscopically guided techniques. Many procedures can deliver high radiation doses to patients and staff, with the potential to cause immediate and delayed radiation effects. The challenge for interventionists is to maximize benefit, whilst minimizing radiation risk to patients and staff. Non-radiologist clinicians are often inadequately trained in radiation safety and radiobiology. However, clinical governance and legislation now requires a more rigorous approach to protecting patients and staff. Protection can be ensured, and risks can be controlled, by appropriate design, procurement and commissioning of equipment; quality assurance; and optimal operational technique, backed by audit. Interventionists need knowledge and skills to reduce the risks. Appropriate training should include awareness of the potential for radiation injury, equipment operational parameters, doses measurement and recording methods and dose reduction techniques. Clinical governance requires informed consent, appropriate patient counselling and follow-up

  20. Medical interventional procedures--reducing the radiation risks

    Energy Technology Data Exchange (ETDEWEB)

    Cousins, C. E-mail: claire.cousins@addenbrookes.nhs.uk; Sharp, C

    2004-06-01

    Over the last 40 years, the number of percutaneous interventional procedures using radiation has increased significantly, with many secondary care clinicians using fluoroscopically guided techniques. Many procedures can deliver high radiation doses to patients and staff, with the potential to cause immediate and delayed radiation effects. The challenge for interventionists is to maximize benefit, whilst minimizing radiation risk to patients and staff. Non-radiologist clinicians are often inadequately trained in radiation safety and radiobiology. However, clinical governance and legislation now requires a more rigorous approach to protecting patients and staff. Protection can be ensured, and risks can be controlled, by appropriate design, procurement and commissioning of equipment; quality assurance; and optimal operational technique, backed by audit. Interventionists need knowledge and skills to reduce the risks. Appropriate training should include awareness of the potential for radiation injury, equipment operational parameters, doses measurement and recording methods and dose reduction techniques. Clinical governance requires informed consent, appropriate patient counselling and follow-up.

  1. Bayesian-network-based safety risk analysis in construction projects

    International Nuclear Information System (INIS)

    Zhang, Limao; Wu, Xianguo; Skibniewski, Miroslaw J.; Zhong, Jingbing; Lu, Yujie

    2014-01-01

    This paper presents a systemic decision support approach for safety risk analysis under uncertainty in tunnel construction. Fuzzy Bayesian Networks (FBN) is used to investigate causal relationships between tunnel-induced damage and its influential variables based upon the risk/hazard mechanism analysis. Aiming to overcome limitations on the current probability estimation, an expert confidence indicator is proposed to ensure the reliability of the surveyed data for fuzzy probability assessment of basic risk factors. A detailed fuzzy-based inference procedure is developed, which has a capacity of implementing deductive reasoning, sensitivity analysis and abductive reasoning. The “3σ criterion” is adopted to calculate the characteristic values of a triangular fuzzy number in the probability fuzzification process, and the α-weighted valuation method is adopted for defuzzification. The construction safety analysis progress is extended to the entire life cycle of risk-prone events, including the pre-accident, during-construction continuous and post-accident control. A typical hazard concerning the tunnel leakage in the construction of Wuhan Yangtze Metro Tunnel in China is presented as a case study, in order to verify the applicability of the proposed approach. The results demonstrate the feasibility of the proposed approach and its application potential. A comparison of advantages and disadvantages between FBN and fuzzy fault tree analysis (FFTA) as risk analysis tools is also conducted. The proposed approach can be used to provide guidelines for safety analysis and management in construction projects, and thus increase the likelihood of a successful project in a complex environment. - Highlights: • A systemic Bayesian network based approach for safety risk analysis is developed. • An expert confidence indicator for probability fuzzification is proposed. • Safety risk analysis progress is extended to entire life cycle of risk-prone events. • A typical

  2. monIT: A Portuguese Risk Communication Project on EMF

    International Nuclear Information System (INIS)

    Oliveira, Carla; Sebastiao, Daniel; Carpinteiro, Goncalo; Fernandes, Carlos A.; Correia, Luis M.

    2006-01-01

    The monIT project is a risk communication programme, aiming at providing information on exposure to electromagnetic fields (EMF) from mobile communication systems in Portugal. monIT's website, www.lxlit.pt/monit, is the main interface for dissemination of information. Besides including relevant information about EMF for both the general public and the technical community, this website provides results from extensive measurement campaigns performed all over Portugal during the last three years. This paper presents the project's structure and activities, practical results achieved and ends with some conclusions and action lines for future work. (author)

  3. Project risk and appeals in U.S. Forest Service planning

    International Nuclear Information System (INIS)

    Stern, Marc J.; Predmore, S. Andrew; Morse, Wayde C.; Seesholtz, David N.

    2013-01-01

    The National Environmental Policy Act (NEPA) requires U.S. Forest Service planning processes to be conducted by interdisciplinary teams of resource specialists to analyze and disclose the likely environmental impacts of proposed natural resource management actions on Forest Service lands. Multiple challenges associated with these processes have been a source of frustration for the agency. One of these challenges involves administrative appeals through which public entities can challenge a Forest Service decision following a NEPA process. These appeals instigate an internal review process and can result in an affirmation of the Forest Service decision, a reversal of that decision, or additional work that re-initiates all or part of the NEPA process. We examine the best predictors of appeals and their outcomes on a representative sample of 489 Forest Service NEPA processes that were decided between 2007 and 2009. While certain factors associated with pre-existing social contexts (such as a history of controversy) or pre-determined elements of a proposed action (such as the extraction of forest products) predispose certain processes to a higher risk of appeals, other practices and process-related strategies within the control of the agency also appear to bear meaningful influence on the occurrence of appeals and their outcomes. Appeals and their outcomes were most strongly related to programmatic, structural (turnover of personnel in particular), and relationship risks (both internal and external) within the processes, suggesting the need for greater focus within the agency on cultivating positive internal and external relationships to manage the risk of appeals. -- Highlights: ► We examined appeals and their outcomes on 489 U.S. Forest Service NEPA processes. ► Project type, context, team turnover, and personal relationships predicted appeals. ► External relationship management and staff turnover best predicted appeal outcomes. ► Positive internal and

  4. Project risk and appeals in U.S. Forest Service planning

    Energy Technology Data Exchange (ETDEWEB)

    Stern, Marc J., E-mail: mjstern@vt.edu [Department of Forest Resources and Environmental Conservation, Virginia Tech, 304 Cheatham Hall (0324), Blacksburg, VA 24061 (United States); Predmore, S. Andrew, E-mail: spred2@uis.edu [Department of Environmental Studies, University of Illinois-Springfield, Public Affairs Center, Room 314, Springfield, IL 62703 (United States); Morse, Wayde C., E-mail: morsewc@auburn.edu [School of Forestry and Wildlife Sciences, Auburn University, 3301 Forestry and Wildlife Bldg., Auburn, AL 36849 (United States); Seesholtz, David N., E-mail: dseesholtz@fs.fed.us [Focused Science Delivery Program, Pacific Northwest Research Station, USDA Forest Service, 1249S Vinnell Way, Suite 200, Boise, ID 83709 (United States)

    2013-09-15

    The National Environmental Policy Act (NEPA) requires U.S. Forest Service planning processes to be conducted by interdisciplinary teams of resource specialists to analyze and disclose the likely environmental impacts of proposed natural resource management actions on Forest Service lands. Multiple challenges associated with these processes have been a source of frustration for the agency. One of these challenges involves administrative appeals through which public entities can challenge a Forest Service decision following a NEPA process. These appeals instigate an internal review process and can result in an affirmation of the Forest Service decision, a reversal of that decision, or additional work that re-initiates all or part of the NEPA process. We examine the best predictors of appeals and their outcomes on a representative sample of 489 Forest Service NEPA processes that were decided between 2007 and 2009. While certain factors associated with pre-existing social contexts (such as a history of controversy) or pre-determined elements of a proposed action (such as the extraction of forest products) predispose certain processes to a higher risk of appeals, other practices and process-related strategies within the control of the agency also appear to bear meaningful influence on the occurrence of appeals and their outcomes. Appeals and their outcomes were most strongly related to programmatic, structural (turnover of personnel in particular), and relationship risks (both internal and external) within the processes, suggesting the need for greater focus within the agency on cultivating positive internal and external relationships to manage the risk of appeals. -- Highlights: ► We examined appeals and their outcomes on 489 U.S. Forest Service NEPA processes. ► Project type, context, team turnover, and personal relationships predicted appeals. ► External relationship management and staff turnover best predicted appeal outcomes. ► Positive internal and

  5. Reducing health risk assigned to organic emissions from a chemical weapons incinerator.

    Science.gov (United States)

    Laman, David M; Weiler, B Douglas; Skeen, Rodney S

    2013-03-01

    Organic emissions from a chemical weapons incinerator have been characterized with an improved set of analytical methods to reduce the human health risk assigned to operations of the facility. A gas chromatography/mass selective detection method with substantially reduced detection limits has been used in conjunction with scanning electron microscopy/energy dispersive X-ray spectrometry and Fourier transform infrared microscopy to improve the speciation of semi-volatile and non-volatile organics emitted from the incinerator. The reduced detection limits have allowed a significant reduction in the assumed polycyclic aromatic hydrocarbon (PAH) and aminobiphenyl (ABP) emission rates used as inputs to the human health risk assessment for the incinerator. A mean factor of 17 decrease in assigned human health risk is realized for six common local exposure scenarios as a result of the reduced PAH and ABP detection limits.

  6. Reduced Order Model Implementation in the Risk-Informed Safety Margin Characterization Toolkit

    International Nuclear Information System (INIS)

    Mandelli, Diego; Smith, Curtis L.; Alfonsi, Andrea; Rabiti, Cristian; Cogliati, Joshua J.; Talbot, Paul W.; Rinaldi, Ivan; Maljovec, Dan; Wang, Bei; Pascucci, Valerio; Zhao, Haihua

    2015-01-01

    The RISMC project aims to develop new advanced simulation-based tools to perform Probabilistic Risk Analysis (PRA) for the existing fleet of U.S. nuclear power plants (NPPs). These tools numerically model not only the thermo-hydraulic behavior of the reactor primary and secondary systems but also external events temporal evolution and components/system ageing. Thus, this is not only a multi-physics problem but also a multi-scale problem (both spatial, µm-mm-m, and temporal, ms-s-minutes-years). As part of the RISMC PRA approach, a large amount of computationally expensive simulation runs are required. An important aspect is that even though computational power is regularly growing, the overall computational cost of a RISMC analysis may be not viable for certain cases. A solution that is being evaluated is the use of reduce order modeling techniques. During the FY2015, we investigated and applied reduced order modeling techniques to decrease the RICM analysis computational cost by decreasing the number of simulations runs to perform and employ surrogate models instead of the actual simulation codes. This report focuses on the use of reduced order modeling techniques that can be applied to any RISMC analysis to generate, analyze and visualize data. In particular, we focus on surrogate models that approximate the simulation results but in a much faster time (µs instead of hours/days). We apply reduced order and surrogate modeling techniques to several RISMC types of analyses using RAVEN and RELAP-7 and show the advantages that can be gained.

  7. Reduced Order Model Implementation in the Risk-Informed Safety Margin Characterization Toolkit

    Energy Technology Data Exchange (ETDEWEB)

    Mandelli, Diego [Idaho National Lab. (INL), Idaho Falls, ID (United States); Smith, Curtis L. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Alfonsi, Andrea [Idaho National Lab. (INL), Idaho Falls, ID (United States); Rabiti, Cristian [Idaho National Lab. (INL), Idaho Falls, ID (United States); Cogliati, Joshua J. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Talbot, Paul W. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Rinaldi, Ivan [Idaho National Lab. (INL), Idaho Falls, ID (United States); Maljovec, Dan [Idaho National Lab. (INL), Idaho Falls, ID (United States); Wang, Bei [Idaho National Lab. (INL), Idaho Falls, ID (United States); Pascucci, Valerio [Idaho National Lab. (INL), Idaho Falls, ID (United States); Zhao, Haihua [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-09-01

    The RISMC project aims to develop new advanced simulation-based tools to perform Probabilistic Risk Analysis (PRA) for the existing fleet of U.S. nuclear power plants (NPPs). These tools numerically model not only the thermo-hydraulic behavior of the reactor primary and secondary systems but also external events temporal evolution and components/system ageing. Thus, this is not only a multi-physics problem but also a multi-scale problem (both spatial, µm-mm-m, and temporal, ms-s-minutes-years). As part of the RISMC PRA approach, a large amount of computationally expensive simulation runs are required. An important aspect is that even though computational power is regularly growing, the overall computational cost of a RISMC analysis may be not viable for certain cases. A solution that is being evaluated is the use of reduce order modeling techniques. During the FY2015, we investigated and applied reduced order modeling techniques to decrease the RICM analysis computational cost by decreasing the number of simulations runs to perform and employ surrogate models instead of the actual simulation codes. This report focuses on the use of reduced order modeling techniques that can be applied to any RISMC analysis to generate, analyze and visualize data. In particular, we focus on surrogate models that approximate the simulation results but in a much faster time (µs instead of hours/days). We apply reduced order and surrogate modeling techniques to several RISMC types of analyses using RAVEN and RELAP-7 and show the advantages that can be gained.

  8. Developing risk-based priorities for reducing air pollution in urban settings in Ukraine.

    Science.gov (United States)

    Brody, Michael; Caldwell, Jane; Golub, Alexander

    2007-02-01

    Ukraine, when part of the former Soviet Union, was responsible for about 25% of its overall industrial production. This aging industrial infrastructure continues to emit enormous volumes of air and water pollution and wastes. The National Report on the State of Environment in Ukraine 1999 (Ukraine Ministry of Environmental Protection [MEP], 2000) shows significant air pollution. There are numerous emissions that have been associated with developmental effects, chronic long-term health effects, and cancer. Ukraine also has been identified as a major source of transboundary air pollution for the eastern Mediterranean region. Ukraine's Environment Ministry is not currently able to strategically target high-priority emissions and lacks the resources to address all these problems. For these reasons, the U.S. Environmental Protection Agency set up a partnership with Ukraine's Ministry of Environmental Protection to strengthen its capacity to set environmental priorities through the use of comparative environmental risk assessment and economic analysis--the Capacity Building Project. The project is also addressing improvements in the efficiency and effectiveness of the use of its National Environmental Protection Fund. The project consists of a series of workshops with Ukrainian MEP officials in comparative risk assessment of air pollutant emissions in several heavily industrialized oblasts; cost-benefit and cost-effectiveness analysis; and environmental finance. Pilot risk assessment analyses have been completed. At the end of the Capacity Building Project it is expected that the use of the National Environmental Protection fund and the regional level oblast environmental protection funds will begin to target and identify the highest health and environmental risk emissions.

  9. Reduced cancer risk in vegetarians: an analysis of recent reports.

    Science.gov (United States)

    Lanou, Amy Joy; Svenson, Barbara

    2010-12-20

    This report reviews current evidence regarding the relationship between vegetarian eating patterns and cancer risk. Although plant-based diets including vegetarian and vegan diets are generally considered to be cancer protective, very few studies have directly addressed this question. Most large prospective observational studies show that vegetarian diets are at least modestly cancer protective (10%-12% reduction in overall cancer risk) although results for specific cancers are less clear. No long-term randomized clinical trials have been conducted to address this relationship. However, a broad body of evidence links specific plant foods such as fruits and vegetables, plant constituents such as fiber, antioxidants and other phytochemicals, and achieving and maintaining a healthy weight to reduced risk of cancer diagnosis and recurrence. Also, research links the consumption of meat, especially red and processed meats, to increased risk of several types of cancer. Vegetarian and vegan diets increase beneficial plant foods and plant constituents, eliminate the intake of red and processed meat, and aid in achieving and maintaining a healthy weight. The direct and indirect evidence taken together suggests that vegetarian diets are a useful strategy for reducing risk of cancer.

  10. Multi-site risk-based project planning, optimization, sequencing, & budgeting process and tool for the integrated facility disposition project

    International Nuclear Information System (INIS)

    Nelson, J.G.; Castillo, C.; Huntsman, J.; Killoy, S.; Lucek, H.; Marks, T.C.

    2011-01-01

    Faced with the Department of Energy (DOE) Complex Transformation, National Nuclear Security Administration (NNSA) was tasked with developing an integrated plan for the decommissioning of over 400 facilities and 300 environmental remediation units, as well as the many reconfiguration and modernization projects at the Oak Ridge National Laboratory (ORNL) and Y-12 Complex. Manual scheduling of remediation activities is time-consuming and inherently introduces bias of the scheduler or organization into the process. Clearly a well-defined process, quantitative risk-based tool was needed to develop an objective, unbiased baseline sequence and schedule with a sound technical foundation for the Integrated Facility Disposition Project (IFDP). Faced with limited available data, innovation was needed to extrapolate intelligent relative data for key risk parameters based on known data elements. The IFDP Supermodel was customized and expanded to provide this capability for conceptual planning of diverse project portfolios and multiple sites. (author)

  11. Reducing the risk of Legionnaires' disease associated with cooling towers

    Energy Technology Data Exchange (ETDEWEB)

    Freije, M.R. [HC Information Resources Inc., Carlsbad, CA (United States)

    2008-08-15

    To reduce the health and legal risks associated with Legionnaires' disease, facility managers should take steps to minimize Legionella bacteria in plumbing systems, open industrial equipment, water features, cooling towers, and other aerosolizing water systems. The risk of Legionnaires' disease associated with cooling towers can be reduced by controlling Legionella bacteria in cooling water and preventing transmission of the bacteria from towers to people. This paper presents nine reasonable ways to accomplish these goals. (orig.)

  12. Risk projection and the fertility of rural families.

    Science.gov (United States)

    Song, R

    1991-01-01

    The author comments on the theories and empirical evidence which aid in understanding the determinants of the reproductive behavior of farmers in China. The issues are defined, and discussion expands on the needs for a specific number of children in rural versus urban areas, M. Cain's risk insurance hypothesis, the importance of modes of production for the farm family, the farmer's security versus risks, and the balance between risk projection and the maximization of interest. The significance of risk projection is presented as are the implications for policy making. Neither theory of farmer's reproductive behavior, 1) the economic cost and benefit theory or 2) the need for labor theory is considered suitable. The idea that benefits exceed the costs of rearing children cannot justify the repeated cycle of poverty among farmers with many children. The Hubei Province, Danjiankou City, study which estimates rearing costs of 3360 yuan/child benefits of 305 yuan/year to the parents in old age is considered incorrect. The second theory agrees that children are needed for production but recognized surplus labor and does not account for the fact that the more children, the poorer the family. Micro demographic theories identify factors affecting demographic behavior, the extent to which factors affect fertility, and the interrelatedness of factors. The rural family feels jeopardized with one child, and the lowest tolerable number of children is 2-3 in rural areas. Manual labor is the basis of the traditional peasant economy. In this economy, loss of income is a threat whether due to crop failure, weather changes, or market changes. Payment occurs at the end of the year only. Child health is a risk due to poor nutrition and poor health facilities. Following a one-child policy might jeopardize perpetuation of the family line and provision for parents by sons. Urban risks are different. Rural families limit risk by keeping material resources, enlarging and strengthening the

  13. CONDITIONS OF SUSTAINABILITY OF INVESTMENT BUILDING PROJECTS BASED ON THE RISK MANAGEMENT CONCEPT

    Directory of Open Access Journals (Sweden)

    Morozenko Andrey Aleksandrovich

    2012-10-01

    minimization of risky situations requires reduction of the project implementation period; development of domestic methodologies and standards of project risk management tailored to the conditions of our construction industry is a relevant assignment.

  14. Policies for Reducing Coastal Risk on the East and Gulf Coasts

    Science.gov (United States)

    Glickson, D.; Johnson, S.

    2014-12-01

    Hurricane- and coastal storm-related economic losses have increased substantially over the past century, largely due to expanding population and development in susceptible coastal areas. Concurrent with this growth, the federal government has assumed an increasing proportion of the financial responsibility associated with U.S. coastal storms, which may discourage state and local governments from taking appropriate actions to reduce risk and enhance resilience. Strategies to manage coastal storm risks fall into two categories: reducing the probability of flooding or wave impact (such as seawalls, storm surge barriers, beach nourishment, dune building, restoration/expansion of oyster reefs, salt marshes, and mangroves) and reducing the number or vulnerability of people or structures (such as relocation, land-use planning, and elevating or floodproofing buildings). Over the past century, most coastal risk management programs have emphasized coastal armoring, while doing little to decrease development in harm's way. This National Research Council report calls for the development of a national vision for managing coastal risks that includes a long-term view, regional solutions, and recognition of all benefits. A national coastal risk assessment is needed to identify high priority areas. Benefit-cost analysis provides a reasonable framework to evaluate national investments in coastal risk reduction, if constrained by other important environmental, social, and life-safety factors. Extensive collaboration and additional policy changes will be necessary to move from a nation that is primarily reactive to coastal disasters to one that invests wisely in coastal risk reduction and builds resilience among coastal communities.

  15. Reducing volcanic risk on Fogo Volcano, Cape-Verde, through a participatory approach: which out coming?

    Science.gov (United States)

    Texier-Teixeira, P.; Chouraqui, F.; Perrillat-Collomb, A.; Lavigne, F.; Cadag, J. R.; Grancher, D.

    2013-11-01

    This research paper presents the outcomes of the Work Package 5 (Socio-economical Vulnerability Assessment and Community-Based Disaster Risk Reduction) of the MIAVITA Research Program (MItigate and Assess risk from Volcanic Impact on Terrain and human Activities) conducted in Fogo Volcano, Cape-Verde. The study lasted for almost 3 yr (May 2010-January 2012) of which most of the time was spent in the village of Chã das Caldeiras, situated within the 9 km-wide caldera of the volcano inside the Fogo Natural Park. The objectives of the program included assessment of the vulnerability of the community at risk in terms of livelihoods, access to resources, and power relations between the local people and the different public and private institutions. These are important factors that need to be investigated in order to understand the root causes of vulnerability of the local people. This case study shows that the voluntary exposure of people at volcanic threats is linked with daily access to sources of livelihood specially agriculture and tourism. This is despite the perception of people of the risk on their lives and properties. In order to counter the factors of vulnerability, the study also aimed to identify and enhance local capacities. To achieve such objective, a Participatory 3-Dimensional Mapping (P3DM) activity was conducted to facilitate the dialogue between the local people and the different stakeholders as well as to prepare plans and measures to reduce volcanic risk. The P3DM was a half success considering that it has not yet led to an operational plan which takes into account the local capacities. The main reasons included (1) the non-participative aspect of the project at the beginning which should have identified priorities for people and let them lead the project to ensure the sustainability (2) deep conflicts within the community which complicated the focus group discussions around the 3-D map, and the difficulties to involve more marginalized people

  16. Quantitative risk management in gas injection project: a case study from Oman oil and gas industry

    Science.gov (United States)

    Khadem, Mohammad Miftaur Rahman Khan; Piya, Sujan; Shamsuzzoha, Ahm

    2017-09-01

    The purpose of this research was to study the recognition, application and quantification of the risks associated in managing projects. In this research, the management of risks in an oil and gas project is studied and implemented within a case company in Oman. In this study, at first, the qualitative data related to risks in the project were identified through field visits and extensive interviews. These data were then translated into numerical values based on the expert's opinion. Further, the numerical data were used as an input to Monte Carlo simulation. RiskyProject Professional™ software was used to simulate the system based on the identified risks. The simulation result predicted a delay of about 2 years as a worse case with no chance of meeting the project's on stream date. Also, it has predicted 8% chance of exceeding the total estimated budget. The result of numerical analysis from the proposed model is validated by comparing it with the result of qualitative analysis, which was obtained through discussion with various project managers of company.

  17. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  18. Reducing mortality risk by targeting specific air pollution sources: Suva, Fiji.

    Science.gov (United States)

    Isley, C F; Nelson, P F; Taylor, M P; Stelcer, E; Atanacio, A J; Cohen, D D; Mani, F S; Maata, M

    2018-01-15

    Health implications of air pollution vary dependent upon pollutant sources. This work determines the value, in terms of reduced mortality, of reducing ambient particulate matter (PM 2.5 : effective aerodynamic diameter 2.5μm or less) concentration due to different emission sources. Suva, a Pacific Island city with substantial input from combustion sources, is used as a case-study. Elemental concentration was determined, by ion beam analysis, for PM 2.5 samples from Suva, spanning one year. Sources of PM 2.5 have been quantified by positive matrix factorisation. A review of recent literature has been carried out to delineate the mortality risk associated with these sources. Risk factors have then been applied for Suva, to calculate the possible mortality reduction that may be achieved through reduction in pollutant levels. Higher risk ratios for black carbon and sulphur resulted in mortality predictions for PM 2.5 from fossil fuel combustion, road vehicle emissions and waste burning that surpass predictions for these sources based on health risk of PM 2.5 mass alone. Predicted mortality for Suva from fossil fuel smoke exceeds the national toll from road accidents in Fiji. The greatest benefit for Suva, in terms of reduced mortality, is likely to be accomplished by reducing emissions from fossil fuel combustion (diesel), vehicles and waste burning. Copyright © 2017. Published by Elsevier B.V.

  19. Breast-feeding reduces the risk for childhood eczema.

    Science.gov (United States)

    Kull, Inger; Böhme, Maria; Wahlgren, Carl-Fredrik; Nordvall, Lennart; Pershagen, Göran; Wickman, Magnus

    2005-09-01

    The evidence for a preventive effect of breast-feeding on the development of eczema in childhood remains controversial. To investigate the effect of breast-feeding in various phenotypes of eczema to 4 years. A birth cohort of 4089 children made up the study base. Data on breast-feeding, allergic symptoms, and potential confounders were obtained from questionnaires when the children were 2 months and 1, 2, and 4 years old. At 4 years, blood specific IgE was analyzed. Children with symptoms of eczema and asthma during the period of breast-feeding were excluded in most analyses on risk assessment of eczema and asthma, respectively, to avoid disease-related modification of exposure. Exclusive breast-feeding for >or=4 months reduced the risk for eczema at the age of 4 years (odds ratio [OR], 0.78; 95% CI, 0.63--0.96) irrespective of combination with asthma, sensitization to common allergens, or parental allergic disease. This decreased risk was most evident for children with onset of eczema during the first 2 years persisting to 4 years (OR, 0.59; 95% CI, 0.45--0.77). Among children with early-onset eczema, irrespective of persistency, followed by late onset of asthma or early-onset asthma irrespective of persistency, followed by late-onset eczema to 4 years, a protective effect of breast-feeding was also seen (OR, 0.48; 95% CI, 0.30--0.76). Breast-feeding 4 months or more reduces the risk for eczema and onset of the allergy march to age 4.

  20. Information technology project risk management in Peru

    OpenAIRE

    Del Carpio Gallegos, Javier

    2014-01-01

    This article shows how some principles, uses, and practices of risk management are applied in information technology projects in Peru; in the last four years, in representative sectors like manufacturing, banking, information and communications, academics institutions, construction, government, consulting, services, and others. El presente artículo muestra algunos principios, usos y prácticas de cómo la gestión de riesgos de proyectos de tecnología se ha llevado a cabo en los últimos cuatr...

  1. Assessment of risks due to climate change for the Upper Tamakoshi Hydropower Project in Nepal

    Directory of Open Access Journals (Sweden)

    Sangam Shrestha

    2016-01-01

    Full Text Available Climate change poses significant challenges to hydropower development and management in mountainous basins. This study examined the impact of climate change, and the associated risks, on the energy production of the Upper Tamakoshi Hydropower Project, which is located in the Tamakoshi basin of Nepal. The outputs of three GCMs—namely MIROC-ESM, MRI-CGCM3, and MPI-ESM-M—under the Representative Concentration Pathways (RCP scenarios were used for the projection of precipitation and temperature in the future. The minimum and maximum temperatures of the basin are projected to increase by 6.33 °C and 3.82 °C, respectively, by 2100. The projected precipitation varies from −8% to +24.8%, which is expected to alter the streamflow by −37.83% to +47% in the future. Based on the streamflow output, the risk for energy production was calculated with respect to the baseline energy production of 1963 GW h and 2281 GW h. Using the three GCMs, the risk associated with annual hydropower production under altered runoff was analyzed. The risk percentage in the future periods shows a mild risk varying from 0.69% to 6.63%. MPI-ESM-M GCM projects a higher percentage of risk for energy production during the same future periods, as compared to the baseline energy production of 1963 GW h. A mild to moderate risk, ranging from 2.73% to 13.24% can be expected when energy production in the future is compared to the baseline energy production of 2281 GW h.

  2. Study Shows Aspirin Reduces Colorectal Cancer in Those at High Risk

    Science.gov (United States)

    Findings from the first large clinical trial of its kind indicate that taking high doses of aspirin daily for at least 2 years substantially reduces the risk of colorectal cancer among people at increased risk of the disease.

  3. Comparison of human exposure pathways in an urban brownfield: reduced risk from paving roads.

    Science.gov (United States)

    James, Kyle; Farrell, Richard E; Siciliano, Steven D

    2012-10-01

    Risk assessments often do not quantify the risk associated with soil inhalation. This pathway generally makes a negligible contribution to the cumulative risk, because soil ingestion is typically the dominant exposure pathway. Conditions in northern or rural centers in Canada characterized by large areas of exposed soil, including unpaved roads, favor the resuspension of soil particles, making soil inhalation a relevant risk pathway. The authors determined and compared human exposure to metals and polycyclic aromatic hydrocarbons (PAHs) from soil ingestion and inhalation and analyzed the carcinogenic and noncarcinogenic risks before and after roads were paved in a northern community. To determine the inhalation exposure, three size fractions of airborne particulate matter were collected (total suspended particulates [TSP], particulate matter with an aerodynamic diameter less than 10 µm [PM10], and particulate matter with an aerodynamic diameter less than 2.5 µm [PM2.5]) before and after roads were paved. Road paving reduced the concentration of many airborne contaminants by 25 to 75%, thus reducing risk. For example, before paving, the carcinogenic risk associated with inhalation of Cr was 3.4 excess cancers per 100,000 people exposed, whereas after paving, this risk was reduced to 1.6 in 100,000. Paving roads reduced the concentrations of total suspended particulates (TSP; p roads is an effective method of reducing risk from the inhalation of soil particles. Copyright © 2012 SETAC.

  4. Improving Software Engineering on NASA Projects

    Science.gov (United States)

    Crumbley, Tim; Kelly, John C.

    2010-01-01

    Software Engineering Initiative: Reduces risk of software failure -Increases mission safety. More predictable software cost estimates and delivery schedules. Smarter buyer of contracted out software. More defects found and removed earlier. Reduces duplication of efforts between projects. Increases ability to meet the challenges of evolving software technology.

  5. Natural disturbance reduces disease risk in endangered rainforest frog populations.

    Science.gov (United States)

    Roznik, Elizabeth A; Sapsford, Sarah J; Pike, David A; Schwarzkopf, Lin; Alford, Ross A

    2015-08-21

    Natural disturbances can drive disease dynamics in animal populations by altering the microclimates experienced by hosts and their pathogens. Many pathogens are highly sensitive to temperature and moisture, and therefore small changes in habitat structure can alter the microclimate in ways that increase or decrease infection prevalence and intensity in host populations. Here we show that a reduction of rainforest canopy cover caused by a severe tropical cyclone decreased the risk of endangered rainforest frogs (Litoria rheocola) becoming infected by a fungal pathogen (Batrachochytrium dendrobatidis). Reductions in canopy cover increased the temperatures and rates of evaporative water loss in frog microhabitats, which reduced B. dendrobatidis infection risk in frogs by an average of 11-28% in cyclone-damaged areas, relative to unaffected areas. Natural disturbances to the rainforest canopy can therefore provide an immediate benefit to frogs by altering the microclimate in ways that reduce infection risk. This could increase host survival and reduce the probability of epidemic disease outbreaks. For amphibian populations under immediate threat from this pathogen, targeted manipulation of canopy cover could increase the availability of warmer, drier microclimates and therefore tip the balance from host extinction to coexistence.

  6. Cereal fiber intake may reduce risk of gastric adenocarcinomas : The EPIC-EURGAST study

    NARCIS (Netherlands)

    Mendez, M. A.; Pera, Guillem; Aguclo, Antonio; Bueno-de-Mesquita, H. Bas; Palli, Domenico; Boeing, Heiner; Carneiro, Ftima; Berrino, Franco; Sacerdote, Carlotta; Tumino, Rosario; Panico, Salvatore; Berglund, Goeran; Manjer, Jonas; Johansson, Ingegerd; Stenling, Roger; Martinez, Carmen; Dorronsoro, Miren; Barricarte, Aurelio; Tormo, Maria J.; Quiros, Jose R.; Allen, Naomi; Key, Timothy J.; Bingham, Sheila; Linseisen, Jakob; Kaaks, Rudolf; Overvad, Kim; Jensen, Majken; Olsen, Anja; Tjonneland, Anne; Peeters, Petra H. M.; Numans, Mattijs E.; Ocke, Marga C.; Clavel-Chapelon, Francoise; Boutron-Ruault, Marie-Christine; Trichopoulou, Antonia; Lund, Eiliv; Slimani, Nadia; Jenab, Mazda; Ferrari, Pietro; Riboli, Elio; Gonzalez, Carlos A.

    2007-01-01

    Numerous case-control studies suggest dietary fiber may reduce risk of gastric cancer, but this has not been confirmed prospectively. A previous case-control study reported reduced risk of gastric cardia adenocarcinomas associated with cereal fiber, but not with fruit or vegetable fiber. To date,

  7. RIMAP demonstration project. Risk-based life management of piping system in power plant Heilbronn

    International Nuclear Information System (INIS)

    Bareiss, J.; Buck, P.; Matschecko, B.; Jovanovic, A.; Balos, D.; Perunicic, M.

    2004-01-01

    In the framework of EU project RIMAP [Risk Based Inspection and Maintenance Procedures for European Industry (2000)] a new European Guideline for optimized risk based maintenance and inspection planning of industrial plants (RBLM, Risk Based Life Management) is being developed. The RIMAP project consists of the three clustered projects: - development (RTD); - demonstration (DEMO): - thematic network (TN). Current work and future, planned work in RIMAP demonstration project on applications of the RIMAP methodology in power plants are presented briefly in the first part of the paper. Also presented in the paper are the results of a preliminary analysis of piping system in power plant Heilbronn using the concept of risk-based monitoring as part of overall concept of risk-based life management. Shortly the following issues are discussed in the paper: - identification of critical components; - application of a multilevel risk analysis (...from 'screening' to 'detailed analysis'); - determination of PoF (Probability of Failure); - determination of CoF (Consequence of Failure); - optimation of inspection and maintenance plan. From our experience with the application of the RIMAP methodology the following conclusions can be drawn: The use of risk-based methods in inspection and maintenance of piping systems in power plants gives transparency to the decision making process and gives an optimized maintenance policy based on current state of the components. The results of the work clearly show the power of the proposed method for concentration on critical items: out of 64 monitored components 5 were selected for intermediate analysis and only 1 for the detailed analysis (probabilistic high temperature fracture mechanics)

  8. Reducing Fall Risk with Combined Motor and Cognitive Training in Elderly Fallers

    Directory of Open Access Journals (Sweden)

    Francesco Barban

    2017-02-01

    Full Text Available Background. Falling is a major clinical problem in elderly people, demanding effective solutions. At present, the only effective intervention is motor training of balance and strength. Executive function-based training (EFt might be effective at preventing falls according to evidence showing a relationship between executive functions and gait abnormalities. The aim was to assess the effectiveness of a motor and a cognitive treatment developed within the EU co-funded project I-DONT-FALL. Methods. In a sample of 481 elderly people at risk of falls recruited in this multicenter randomised controlled trial, the effectiveness of a motor treatment (pure motor or mixed with EFt of 24 one-hour sessions delivered through an i-Walker with a non-motor treatment (pure EFt or control condition was evaluated. Similarly, a 24 one-hour session cognitive treatment (pure EFt or mixed with motor training, delivered through a touch-screen computer was compared with a non-cognitive treatment (pure motor or control condition. Results. Motor treatment, particularly when mixed with EFt, reduced significantly fear of falling (F(1,478 = 6.786, p = 0.009 although to a limited extent (ES −0.25 restricted to the period after intervention. Conclusions. This study suggests the effectiveness of motor treatment empowered by EFt in reducing fear of falling.

  9. THE FINANCIAL TOOLS FOR COVER POLITICAL RISKS IN PROJECT FINANCE

    Directory of Open Access Journals (Sweden)

    S. Naumenkova

    2016-10-01

    Full Text Available This article examines the risk-mitigation in public-private partnership. Today Ukraine is ranked as "CRT-5 country" and has high levels of economic and political risk. Political risk grows steadily because of financial and political instability in Ukraine. We conclude that investors continue to rank political risk as a key obstacle to long-term investing. The tools for cover many types of political risks such as war, terrorism, civil disturbance, breach of contract, export or operating license cancellation, currency inconvertibility and transfer restriction, change of laws and regulations etc. are described by authors. We focus on the advantages of World Bank Group Guarantee products. The guarantee instruments of the three WBG institutions for cover political risks under different circumstances are the most suitable for public-private partnership in Ukraine. In this article the political risk-mitigation with IBRD Partial Risk Guarantee put forward by authors for PPP projects in Ukraine.

  10. RIMAP demonstration project. Pat. 1: Risk based life management of piping system in power plant Heilbronn

    International Nuclear Information System (INIS)

    Bareiss, J.; Puck, P.; Matschecko, B.; Jovanovic, A.; Balos, D.; Perunicic

    2003-01-01

    In the framework of EU project RIMAP [1] a new European Guideline for optimized risk based maintenance and inspection planning of industrial plants (RBLM - Risk Based Life Management) is being developed. The RIMAP project consists of the three clustered projects: development (RTD), demonstration (DEMO) and thematic network (TN). Current work and future, planned work in RIMAP demonstration project on applications of the RIMAP methodology in power plants are presented briefly in the first part of the paper. Also presented in the paper are the results of a preliminary analysis of piping system in power plant Heilbronn using the concept of risk-based monitoring as part of overall concept of risk-based life management. Shortly the following issues are discussed in the paper: identification of critical components, application of a multilevel risk analysis (..from ''screening'' to ''detailed analysis''), determination of PoF - Probability of Failure, determination of COF - Consequence of Failure and optimation of inspection and maintenance plan. (orig.)

  11. Psychological strategies to reduce energy consumption: project summary report

    Energy Technology Data Exchange (ETDEWEB)

    Becker, L J; Seligman, C; Darley, J M

    1979-06-30

    This report reviews the research conducted in connection with a project to apply psychological theory and procedures to the problems of encouraging residential energy conservation. A major part of the project involved surveys of residents' energy-related attitudes. The best (and only consistent) attitudinal predictor of residents' actual energy consumption was their attitude about thermal comfort. A number of other attitudes that could conceivably have been related to consumption, such as attitudes about the reality of the crisis, were not found to be related to consumption. Another major focus of the project was on the effectiveness of feedback (that is, giving residents information about their energy use) as an aid to residents' conservation efforts. A series of experiments demonstrated that frequent, credible energy-consumption feedback, coupled with encouragement to adopt a reasonable but difficult energy-conservation goal, could facilitate conservation. However, these studies also demonstrated that residents could not be given just any kind of information about their energy use as feedback and that even proper feedback would not lead to conservation in all households. Conditions that are crucial for the success of feedback as a conservation aid are discussed. Other studies conducted by the project looked at the effect on energy consumption of (1) a device to reduce air-conditioning waste by signalling when it is cool outside, (2) an automatic multi-setback thermostat, and (3) utility companies' average payment plans. A survey of residents' knowledge of their energy use also was conducted. 23 references.

  12. Development of a Blueprint Impact System of the risks on construction projects Implementation

    Directory of Open Access Journals (Sweden)

    Entisar Kadhim Rasheed

    2015-08-01

    Full Text Available In Production and Operations Management the specialists have tried to develop a strategy to counter the risks arising from the activities of the organization and of waste of various types and therefore the risk management in the contemporary framework represents a phenomenon of new quality, and can not be this phenomenon to take practical dimensions, but the development of culture of the organization towards the risks and deal with all aspects and paint ways to address them within an integrated program, and requires new skills and systems provide accurate information capable of coordination between the various parties within the organization. The research aims to develop a blue print to analyze the relationship between the impact of risk and stages of implementing of the project and, the effect of risk relationship with the type of contract, and the impact of risks to do with the type of construction works. In this paper a number of risks has been identified that have already occurred from the study of a number of construction projects completed and theoretical studies and interview a number of construction industry experts to determine the extent of the impact of these risks in each of these three axes in construction projects in Iraq for the purpose of responding and management. The study found a set of conclusions such as existing of priority in happiness of risks which proof that there is an relationship between the risks and sort of stage, contract and constructional work. In the light of what has been reached for the purpose of benefiting from the computer automated features a program have been used ( Vanguard Software System to build the decision tree in order to manage the risks according to their priority in happiness.

  13. Risk-reducing mastectomy and salpingo-oophorectomy in unaffected BRCA mutation carriers: uptake and timing

    DEFF Research Database (Denmark)

    Skytte, A-B; Gerdes, Anne-Marie Axø; Andersen, M K

    2010-01-01

    from 306 healthy BRCA carriers with no personal history of ovarian or breast cancer. We found a 10-year uptake of 75% for risk-reducing salpingo-oophorectomy and 50% for risk-reducing mastectomy by time to event analysis. Age and childbirth influenced this decision. The uptake rate has not changed......Once female carriers of a BRCA mutation are identified they have to make decisions on risk management. The aim of this study is to outline the uptake of risk-reducing surgery in the Danish population of BRCA mutation positive women and to search for factors affecting this decision. We analysed data...

  14. Wind farm project economics : value of wind

    Energy Technology Data Exchange (ETDEWEB)

    Bills-Everett, T. [Mainstream Renewable Power, Toronto, ON (Canada)

    2010-07-01

    This PowerPoint presentation discussed methods of increasing the value of wind power projects. Appropriate turbine selection and layout is needed to ensure that wind resources are fully developed. Construction costs have a significant impact on project costs. The world turbine price index has not significantly fluctuated since 2006. Operating costs, and the value of wind power projects, are linked with OPEX fluctuations. Wind power projects can significantly reduce greenhouse gas (GHG) emissions. An increase in wind power capacity will reduce the overall cost of energy produced from wind power. Countries can use wind power as part of a renewable energy portfolio designed to reduce risks related to diminishing petroleum supplies. Wind power will help to ensure a global transition to renewable energy use. tabs., figs.

  15. AN APPROACH TO REDUCE THE STORAGE REQUIREMENT FOR BIOMETRIC DATA IN AADHAR PROJECT

    Directory of Open Access Journals (Sweden)

    T. Sivakumar

    2013-02-01

    Full Text Available AADHAR is an Indian Government Project to provide unique identification to each Citizen of India. The objective of the project is to collect all the personal details and the biometric traits from each individual. Biometric traits such as iris, face and fingerprint are being collected for authentication. All the information will be stored in a centralized data repository. Considering about the storage requirement for the biometric data of the entire population of India, approximately 20,218 TB of storage space will be required. Since 10 fingerprint data are stored, fingerprint details will take most of the space. In this paper, the storage requirement for the biometric data in the AADHAR project is analyzed and a method is proposed to reduce the storage by cropping the original biometric image before storing. This method can reduce the storage space of the biometric data drastically. All the measurements given in this paper are approximate only.

  16. Bridging the Divide between Safety and Risk Management for your Project or Program

    Science.gov (United States)

    Lutomski, Mike

    2005-01-01

    This presentation will bridge the divide between these separate but overlapping disciplines and help explain how to use Risk Management as an effective management decision support tool that includes safety. Risk Management is an over arching communication tool used by management to prioritize and effectively mitigate potential problems before they concur. Risk Management encompasses every kind of potential problem that can occur on a program or project. Some of these are safety issues such as hazards that have a specific likelihood and consequence that need to be controlled and included to show an integrated picture of accepted) mitigated, and residual risk. Integrating safety and other assurance disciplines is paramount to accurately representing a program s or projects risk posture. Risk is made up of several components such as technical) cost, schedule, or supportability. Safety should also be a consideration for every risk. The safety component can also have an impact on the technical, cost, and schedule aspect of a given risk. The current formats used for communication of safety and risk issues are not consistent or integrated. The presentation will explore the history of these disciplines, current work to integrate them, and suggestions for integration for the future.

  17. Opportunities to reduce risk associated with nuclear logging techniques

    International Nuclear Information System (INIS)

    Wraight, P.D.; Robinson, E.; de Fleurieu, R.

    1991-01-01

    Nuclear logging provides petroleum exploration and production companies with data that are critical to their decisions and operations. Because this type data is so important, environmentally conscious well-logging and service companies are constantly reviewing the risks to people and environment associated with nuclear sources with the ALARA (as low as reasonably achievable) principle in mind. Opportunities to additionally reduce risks, which can be accomplished only with the active involvement of oil companies, are proposed in this paper

  18. Changing pattern of landslide risk in Europe - The SafeLand project

    Science.gov (United States)

    Nadim, F.; Kalsnes, B.

    2012-04-01

    The need to protect people and property with a changing pattern of landslide hazard and risk caused by climate change and changes in demography, and the reality for societies in Europe to live with the risk associated with natural hazards, were the motives for the project SafeLand: "Living with landslide risk in Europe: Assessment, effects of global change, and risk management strategies." SafeLand is a large, integrating research project under the European Commission's 7th Framework Programme (FP7). The project started on 1 May 2009 and will end on 30 April 2012. It involves 27 partners from 12 European countries, and has international collaborators and advisers from China, India, USA, Japan and Hong Kong. SafeLand also involves 25 End-Users from 11 countries. SafeLand is coordinated by the International Centre for Geohazards (ICG) at Norwegian Geotechnical Institute in Norway. Further information on the SafeLand project can be found at its web site http://safeland-fp7.eu/. Main results achieved in SafeLand include: - Various guidelines related to landslide triggering processes and run-out modelling. - Development and testing of several empirical methods for predicting the characteristics of threshold rainfall events for triggering of precipitation-induced landslides, and development of an empirical model for assessing the changes in landslide frequency (hazard) as a function of changes in the demography and population density. - Guideline for landslide susceptibility, hazard and risk assessment and zoning. - New methodologies for physical and societal vulnerability assessment. - Identification of landslide hazard and risk hotspots for Europe. The results show clearly where areas with the largest landslide risk are located in Europe and the objective approach allows a ranking of the countries by exposed area and population. - Different regional and local climate model simulations over selected regions of Europe at spatial resolutions of 10x10 km and 2.8x2.8 km

  19. The ARGO Project: assessing NA-TECH risks on off-shore oil platforms

    Science.gov (United States)

    Capuano, Paolo; Basco, Anna; Di Ruocco, Angela; Esposito, Simona; Fusco, Giannetta; Garcia-Aristizabal, Alexander; Mercogliano, Paola; Salzano, Ernesto; Solaro, Giuseppe; Teofilo, Gianvito; Scandone, Paolo; Gasparini, Paolo

    2017-04-01

    ARGO (Analysis of natural and anthropogenic risks on off-shore oil platforms) is a 2 years project, funded by the DGS-UNMIG (Directorate General for Safety of Mining and Energy Activities - National Mining Office for Hydrocarbons and Georesources) of Italian Ministry of Economic Development. The project, coordinated by AMRA (Center for the Analysis and Monitoring of Environmental Risk), aims at providing technical support for the analysis of natural and anthropogenic risks on offshore oil platforms. In order to achieve this challenging objective, ARGO brings together climate experts, risk management experts, seismologists, geologists, chemical engineers, earth and coastal observation experts. ARGO has developed methodologies for the probabilistic analysis of industrial accidents triggered by natural events (NA-TECH) on offshore oil platforms in the Italian seas, including extreme events related to climate changes. Furthermore the environmental effect of offshore activities has been investigated, including: changes on seismicity and on the evolution of coastal areas close to offshore platforms. Then a probabilistic multi-risk framework has been developed for the analysis of NA-TECH events on offshore installations for hydrocarbon extraction.

  20. Motivators and barriers of tamoxifen use as risk-reducing medication amongst women at increased breast cancer risk: a systematic literature review.

    Science.gov (United States)

    Meiser, B; Wong, W K T; Peate, M; Julian-Reynier, C; Kirk, J; Mitchell, G

    2017-01-01

    Selective estrogen receptor modulators, such as tamoxifen, reduce breast cancer risk by up to 50% in women at increased risk for breast cancer. Despite tamoxifen's well-established efficacy, many studies show that most women are not taking up tamoxifen. This systematic literature review aimed to identify the motivators and barriers to tamoxifen use 's amongst high-risk women. Using MEDLINE, PsycINFO, and Embase plus reviewing reference lists of relevant articles published between 1995 and 2016, 31 studies (published in 35 articles) were identified, which addressed high-risk women's decisions about risk-reducing medication to prevent breast cancer and were peer-reviewed primary clinical studies. A range of factors were identified as motivators of, and barriers to, tamoxifen uptake including: perceived risk, breast-cancer-related anxiety, health professional recommendation, perceived drug effectiveness, concerns about side-effects, knowledge and access to information about side-effects, beliefs about the role of risk-reducing medication, provision of a biomarker, preference for other forms of breast cancer risk reduction, previous treatment experience, concerns about randomization in clinical trial protocols and finally altruism. Results indicate that the decision for high-risk women regarding tamoxifen use or non-use as a risk-reducing medication is not straightforward. Support of women making this decision is essential and needs to encompass the full range of factors, both informational and psychological.

  1. The Role of Public-Private Partnerships in Local Infrastructure: the Case of Carbon Offset Projects

    International Nuclear Information System (INIS)

    Teichmann, Dorothee

    2011-01-01

    Investment in low carbon infrastructure is considered as an important component of the fight against climate change. The mechanisms of climate regulation (such as carbon offsets) transfer to project developers the risks associated with reducing emissions of greenhouse gas (GHG) emissions, i.e. operational and technological risk, or risks associated with the environmental monitoring and the regulatory mechanism itself. The success of projects - and thus their ability to attract private capital - depends importantly on the risk sharing arrangements between the private and public partners involved in the project. We show that the delegation of tasks between the partners can create risks that affect the environmental effectiveness and economic efficiency of the project. Contracts need to be well designed to mitigate those risks. For a sample of landfill gas flaring projects financed under the Clean Development Mechanism, it is shown that the out-sourcing of the provision of technology creates additional risks. The out-sourcing of the development of the Project Design Documents as required by UNFCCC and the separation of the operation of the landfill and the CDM project appear to be manageable by risk sharing arrangements between partners. In the latter case, each partner should bear the risk associated with his own responsibility. In fact, if carbon revenues are the only income stream for the CDM project developer, the incentive to reduce GHG emissions is maintained. (author)

  2. Norms and international standards related to reduce risk management: A literature review

    Directory of Open Access Journals (Sweden)

    César Fuentes

    2011-09-01

    Full Text Available The current work aims to develop a revision of the literature within the main concepts in the international rules and standards related to risk management in companies. By this way, there will be an analysis of issues such as the COSO - ERM model, an introduction to the ISO 27000 and 31000 standards; and the Project Management according to PMI targeted at risk management

  3. ERP project implementation and risk management of nuclear power enterprise

    International Nuclear Information System (INIS)

    Wang Fei

    2008-01-01

    According to the characteristic and development trend of nuclear power enterprise informatization, combined with the general ERP implementation experience, the method is proposed to ensure the successful implementation and risk management of ERP project in nuclear power enterprise. (authors)

  4. Leakage Risk Assessment for a Potential CO2 Storage Project in Saskatchewan, Canada

    Energy Technology Data Exchange (ETDEWEB)

    Houseworth, J.E.; Oldenburg, C.M.; Mazzoldi, A.; Gupta, A.K.; Nicot, J.-P.; Bryant, S.L.

    2011-05-01

    A CO{sub 2} sequestration project is being considered to (1) capture CO{sub 2} emissions from the Consumers Cooperative Refineries Limited at Regina, Saskatchewan and (2) geologically sequester the captured CO{sub 2} locally in a deep saline aquifer. This project is a collaboration of several industrial and governmental organizations, including the Petroleum Technology Research Centre (PTRC), Sustainable Development Technology Canada (SDTC), SaskEnvironment Go Green Fund, SaskPower, CCRL, Schlumberger Carbon Services, and Enbridge. The project objective is to sequester 600 tonnes CO{sub 2}/day. Injection is planned to start in 2012 or 2013 for a period of 25 years for a total storage of approximately 5.5 million tonnes CO{sub 2}. This report presents an assessment of the leakage risk of the proposed project using a methodology known as the Certification Framework (CF). The CF is used for evaluating CO{sub 2} leakage risk associated with geologic carbon sequestration (GCS), as well as brine leakage risk owing to displacement and pressurization of brine by the injected CO{sub 2}. We follow the CF methodology by defining the entities (so-called Compartments) that could be impacted by CO{sub 2} leakage, the CO{sub 2} storage region, the potential for leakage along well and fault pathways, and the consequences of such leakage. An understanding of the likelihood and consequences of leakage forms the basis for understanding CO{sub 2} leakage risk, and forms the basis for recommendations of additional data collection and analysis to increase confidence in the risk assessment.

  5. Risk management in the project of implantation of the repository for low and intermediate level radioactive waste

    International Nuclear Information System (INIS)

    Borssatto, Maria de Fatima B.; Tello, Cledola Cassia O. de; Uemura, George

    2011-01-01

    Project RBMN is part of the Brazilian solution for the storage of radioactive waste generated by the activities of nuclear energy in Brazil. The aim of RBMN is to implement the National Repository to dispose the low and intermediate-level radioactive waste. Risk is a characteristic of all projects, and it is originated from uncertainties, assumptions and the environment of execution of the project. Risk management is the way to monitor systematically these uncertainties and a guaranty that the goals of the project will be attained. A specific methodology for the risk management of the Project RBMN is under development, which integrates models and processes for identification and analysis of risks, reactions, monitoring, control and planning of risk management. This methodology is fundamental and will be of primordial importance for future generations who will be responsible for the operation at final stages, closure and institutional control during the post-closure of the repository. It will provide greater safety to executed processes and safeguarding risks and specific solutions for this enterprise, guaranteeing the safety of the repository in its life cycle, which has a foreseen duration of at least three hundred years. The aim of this paper is to present the preliminary analysis of the opportunities, threats, strong points and weak points identified up to now, that will provide support to implement risk management procedures. The methodology will be based on the PMBOK R - Project Management Board of Knowledge - and will take into consideration the best practices for project management.(author)

  6. Reducing risk where tectonic plates collide

    Science.gov (United States)

    Gomberg, Joan S.; Ludwig, Kristin A.

    2017-06-19

    Most of the world’s earthquakes, tsunamis, landslides, and volcanic eruptions are caused by the continuous motions of the many tectonic plates that make up the Earth’s outer shell. The most powerful of these natural hazards occur in subduction zones, where two plates collide and one is thrust beneath another. The U.S. Geological Survey’s (USGS) “Reducing Risk Where Tectonic Plates Collide—A USGS Plan to Advance Subduction Zone Science” is a blueprint for building the crucial scientific foundation needed to inform the policies and practices that can make our Nation more resilient to subduction zone-related hazards.

  7. Incorporating risk in the economic evaluation of road infrastructure projects

    CSIR Research Space (South Africa)

    Schutte, IC

    2009-05-26

    Full Text Available credibility to the process and ensure strategic decisions that are more defendable. In this study, a prosedure for incorporating risk is suggested. It involves the identification of inputs critical to the economic success of the project, the quantification...

  8. What can individuals do to reduce personal health risks from air pollution?

    Science.gov (United States)

    Laumbach, Robert; Meng, Qingyu; Kipen, Howard

    2015-01-01

    In many areas of the world, concentrations of ambient air pollutants exceed levels associated with increased risk of acute and chronic health problems. While effective policies to reduce emissions at their sources are clearly preferable, some evidence supports the effectiveness of individual actions to reduce exposure and health risks. Personal exposure to ambient air pollution can be reduced on high air pollution days by staying indoors, reducing outdoor air infiltration to indoors, cleaning indoor air with air filters, and limiting physical exertion, especially outdoors and near air pollution sources. Limited evidence suggests that the use of respirators may be effective in some circumstances. Awareness of air pollution levels is facilitated by a growing number of public air quality alert systems. Avoiding exposure to air pollutants is especially important for susceptible individuals with chronic cardiovascular or pulmonary disease, children, and the elderly. Research on mechanisms underlying the adverse health effects of air pollution have suggested potential pharmaceutical or chemopreventive interventions, such as antioxidant or antithrombotic agents, but in the absence of data on health outcomes, no sound recommendations can be made for primary prevention. Health care providers and their patients should carefully consider individual circumstances related to outdoor and indoor air pollutant exposure levels and susceptibility to those air pollutants when deciding on a course of action to reduce personal exposure and health risks from ambient air pollutants. Careful consideration is especially warranted when interventions may have unintended negative consequences, such as when efforts to avoid exposure to air pollutants lead to reduced physical activity or when there is evidence that dietary supplements, such as antioxidants, have potential adverse health effects. These potential complications of partially effective personal interventions to reduce exposure or

  9. ACCIDENT PHENOMENA OF RISK IMPORTANCE PROJECT - Continued RESEARCH CONCERNING SEVERE ACCIDENT PHENOMENA AND MANAGEMENT IN Sweden

    International Nuclear Information System (INIS)

    Rolandson, S.; Mueller, F.; Loevenhielm, G.

    1997-01-01

    Since 1988 all reactors in Sweden have mitigating measures, such as filtered vents, implemented. In parallel with the work of implementing these measures, a cooperation effort (RAMA projects) between the Swedish utilities and the Nuclear Power Inspectorate was performed to acquire sufficient knowledge about severe accident research work. The on-going project has the name Accident Phenomena of Risk Importance 3. In this paper, we will give background information about severe accident management in Sweden. In the Accident Phenomena of Risk Importance 3 project we will focus on the work concerning coolability of melted core in lower plenum which is the main focus of the In-vessel Coolability Task Group within the Accident Phenomena of Risk Importance 3 project. The Accident Phenomena of Risk Importance 3 project has joined on international consortium and the in-vessel cooling experiments are performed by Fauske and Associates, Inc. in Burr Ridge, Illinois, United States America, Sweden also intends to do one separate experiment with one instrument penetration we have in Swedish/Finnish BWR's. Other parts of the Accident Phenomena of Risk Importance 3 project, such as support to level 2 studies, the research at Royal Institute of Technology and participation in international programs, such as Cooperative Severe Accident Research Program, Advanced Containment Experiments and PHEBUS will be briefly described in the paper

  10. The Challenge of Integrating OHS into Industrial Project Risk Management: Proposal of a Methodological Approach to Guide Future Research (Case of Mining Projects in Quebec, Canada

    Directory of Open Access Journals (Sweden)

    Adel Badri

    2015-06-01

    Full Text Available Although risk management tools are put to good use in many industrial sectors, some large projects have been met with numerous problems due to failure to take occupational health and safety (OHS into consideration. In spite of the high level of risk and uncertainty associated with many industrial projects, the number of studies of methods for managing all known risks systematically remains small. Under effervescent economic conditions, industries must meet several challenges associated with frequent project start-ups. In highly complex and uncertain environments, rigorous management of risk remains indispensable for avoiding threats to the success of projects. Many businesses seek continually to create and improve integrated approaches to risk management. This article puts into perspective the complexity of the challenge of integrating OHS into industrial project risk management. A conceptual and methodological approach is proposed to guide future research focused on meeting this challenge. The approach is based on applying multi-disciplinary research modes to a complex industrial context in order to identify all scenarios likely to contain threats to humans or the environment. A case study is used to illustrate the potential of the proposed approach for application and its contribution to meeting the challenge of taking OHS into consideration. On-site researchers were able to develop a new approach that helped two mining companies in Quebec (Canada to achieve successful integration of OHS into expansion projects.

  11. The healthy workplace project: Reduced viral exposure in an office setting.

    Science.gov (United States)

    Reynolds, Kelly A; Beamer, Paloma I; Plotkin, Kevin R; Sifuentes, Laura Y; Koenig, David W; Gerba, Charles P

    2016-05-03

    Viral illnesses such as gastroenteritis and the common cold create a substantial burden in the workplace due to reduced productivity, increased absenteeism, and increased health care costs. Behaviors in the workplace contribute to the spread of human viruses via direct contact between hands, contaminated surfaces, and the mouth, eyes, and/or nose. This study assessed whether implementation of the Healthy Workplace Project (HWP) (providing hand sanitizers, disinfecting wipes, facial tissues, and use instructions) would reduce viral loads in an office setting of approximately 80 employees after seeding fomites and the hands of volunteer participants with an MS-2 phage tracer. The HWP significantly reduced viable phage detected on participants' hands, communal fomites, and personal fomites (p ≤ .010) in office environments and presents a cost-effective method for reducing the health and economic burden associated with viral illnesses in the workplace.

  12. Reducing the Risk of Methadone Overdose PSA (:60)

    Centers for Disease Control (CDC) Podcasts

    2012-07-03

    This 60 second PSA is based on the July 2012 CDC Vital Signs report. Approximately 14 people die every day of overdoses related to methadone. Listen to learn how to reduce your risk of an overdose.  Created: 7/3/2012 by Centers for Disease Control and Prevention (CDC).   Date Released: 7/3/2012.

  13. Longitudinal Impact of the Project PATHS on Adolescent Risk Behavior: What Happened after Five Years?

    Directory of Open Access Journals (Sweden)

    Daniel T. L. Shek

    2012-01-01

    Full Text Available The present study investigated the longitudinal impact of the Project PATHS, a large-scale curriculum-based positive youth development program in Hong Kong, on the development of adolescents’ risk behavior over a period of five years. Using a longitudinal randomized controlled design, eight waves of data were collected from 19 experimental schools in which students participated in the Project PATHS (=2,850 at Wave 8 and 24 control schools without joining the Project PATHS (=3,640 at Wave 8. At each wave, students responded to measures assessing their current risk behaviors, including delinquency, use of different types of drug, and their intentions of participating in risk behaviors in the future. Results demonstrated that adolescents receiving the program exhibited significantly slower increases in delinquent behaviors and substance use as compared to the control participants. During two years after the completion of the program, differences in youth risk behaviors in the two groups still existed. These results suggest that the Project PATHS has long-term effect in preventing adolescent problem behavior through promoting positive youth development.

  14. Pharmacist intervention reduces gastropathy risk in patients using NSAIDs.

    Science.gov (United States)

    Ibañez-Cuevas, Victoria; Lopez-Briz, Eduardo; Guardiola-Chorro, M Teresa

    2008-12-01

    To establish a detection and intervention strategy in order to reduce the number of non-steroidal anti-inflammatory drug (NSAIDs) users at risk of gastropathy from receiving either inadequate or no gastroprotection. Community Pharmacies in Valencia, Spain. Prospective longitudinal intervention study without control group carried out by 79 Community Pharmacies. Patients over 18 who asked for any systemic NSAID were interviewed according to standard procedure. Pharmacist intervention was carried out when a patient at risk of serious NSAID-induced gastrointestinal complications due to inadequate or no gastric protection was identified. The doctor responsible was informed in order to then be able to assess the need to prescribe gastroprotection or change it if inadequate. In the case of over-the-counter (OTC) drugs, pharmacist intervention mainly involved replacing NSAIDs for safer medications. Firstly, the number of patients who had no prescribed gastroprotection or inadequate gastroprotection was determined. Pharmacist intervention then brought about changes in pharmacotherapy in this situation. Of the 6,965 patients who asked for NSAIDs during the study period, 3,054 (43.9%) presented NSAID gastropathy risk factors. 35.6% of the latter (1,089) were not prescribed gastroprotection or were prescribed inadequate gastroprotection. Pharmacist intervention was carried out in 1,075 of these cases. On 391 occasions such risk situations were reported to doctors, who accepted pharmacist intervention on 309 occasions (79.0%) and then either prescribed gastroprotection (77% of cases); changed it (13.9%); withdrew the NSAID (5.8%) or substituted it (3.2%). 235 Pharmacist interventions took place when dispensing OTC NSAIDs. Our strategy allowed us to identify a large number of patients who asked for NSAIDs in Community Pharmacies and who were at risk of NSAID gastropathy, as they received either inadequate gastroprotection or no gastroprotection whatsoever. Moreover, the

  15. A comprehensive study on decreasing the kilovoltage cone-beam CT dose by reducing the projection number.

    Science.gov (United States)

    Lu, Bo; Lu, Haibin; Palta, Jatinder

    2010-05-12

    The objective of this study was to evaluate the effect of kilovoltage cone-beam computed tomography (CBCT) on registration accuracy and image qualities with a reduced number of planar projections used in volumetric imaging reconstruction. The ultimate goal is to evaluate the possibility of reducing the patient dose while maintaining registration accuracy under different projection-number schemes for various clinical sites. An Elekta Synergy Linear accelerator with an onboard CBCT system was used in this study. The quality of the Elekta XVI cone-beam three-dimensional volumetric images reconstructed with a decreasing number of projections was quantitatively evaluated by a Catphan phantom. Subsequently, we tested the registration accuracy of imaging data sets on three rigid anthropomorphic phantoms and three real patient sites under the reduced projection-number (as low as 1/6th) reconstruction of CBCT data with different rectilinear shifts and rota-tions. CBCT scan results of the Catphan phantom indicated the CBCT images got noisier when the number of projections was reduced, but their spatial resolution and uniformity were hardly affected. The maximum registration errors under the small amount transformation of the reference CT images were found to be within 0.7 mm translation and 0.3 masculine rotation. However, when the projection number was lower than one-fourth of the full set with a large amount of transformation of reference CT images, the registration could easily be trapped into local minima solutions for a nonrigid anatomy. We concluded, by using projection-number reduction strategy under conscientious care, imaging-guided localization procedure could achieve a lower patient dose without losing the registration accuracy for various clinical sites and situations. A faster scanning time is the main advantage compared to the mA decrease-based, dose-reduction method.

  16. Active fans and grizzly bears: Reducing risks for wilderness campers

    Science.gov (United States)

    Sakals, M. E.; Wilford, D. J.; Wellwood, D. W.; MacDougall, S. A.

    2010-03-01

    Active geomorphic fans experience debris flows, debris floods and/or floods (hydrogeomorphic processes) that can be hazards to humans. Grizzly bears ( Ursus arctos) can also be a hazard to humans. This paper presents the results of a cross-disciplinary study that analyzed both hydrogeomorphic and grizzly bear hazards to wilderness campers on geomorphic fans along a popular hiking trail in Kluane National Park and Reserve in southwestern Yukon Territory, Canada. Based on the results, a method is proposed to reduce the risks to campers associated with camping on fans. The method includes both landscape and site scales and is based on easily understood and readily available information regarding weather, vegetation, stream bank conditions, and bear ecology and behaviour. Educating wilderness campers and providing a method of decision-making to reduce risk supports Parks Canada's public safety program; a program based on the principle of user self-sufficiency. Reducing grizzly bear-human conflicts complements the efforts of Parks Canada to ensure a healthy grizzly bear population.

  17. The MERINOVA project: MEteorological RIsks as drivers of environmental inNOvation in Agro-ecosystem management

    Science.gov (United States)

    Gobin, Anne; Van de vijver, Hans; Zamani, Sepideh; Curnel, Yannick; Planchon, Viviane; Verspecht, Ann; Van Huylenbroeck, Guido

    2014-05-01

    Devastating weather-related events have captured the interest of the general public in Belgium. Extreme weather events such as droughts, heat waves and rain storms are projected to increase both in frequency and magnitude with climate change. Since more than half of the Belgian territory is managed by the agricultural sector, extreme events may have significant impacts on agro-ecosystem services and pose severe limitations to sustainable agricultural land management. The research hypothesis of the MERINOVA project is that meteorological risks act as drivers of environmental innovation in agro-ecosystem management. The major objectives are to characterise extreme meteorological events, assess the impact on Belgian agro-ecosystems, characterise their vulnerability and resilience to these events, and explore innovative adaptation options to agricultural risk management. The project comprises of five major parts that reflect the chain of risks: the hazard, its impact on different agro-ecosystems, vulnerability, risk management and risk communication. Impacts developed from physically based models not only provide information on the state of the damage at any given time, but also assist in understanding the links between different factors causing damage and determining bio-physical vulnerability. Socio-economic impacts enlarge the basis for vulnerability mapping, risk management and adaptation options. The perspective of rising risk-exposure is exacerbated further by more limits to aid received for agricultural damage and an overall reduction of direct income support to farmers. The main findings of each of these project building blocks will be communicated. MERINOVA provides for a robust and flexible framework by demonstrating its performance across Belgian agro-ecosystems, and by ensuring its relevance to policy makers and practitioners. A strong expert and end-user network is established to help disseminating and exploiting project results to meet user needs. The

  18. Using detection and deterrence to reduce insider risk

    International Nuclear Information System (INIS)

    Eggers, R.F.; Carlson, R.L.; Udell, C.J.

    1988-01-01

    This paper addresses a new concept of interaction between adversary detection and deterrence. It provides an initial evaluation of the effects of these variables on the risk of theft of special nuclear material by an insider adversary and can be extended to the sabotage threat. A steady-state risk equation is used. Exercises with this equation show that deterrence, resulting from the prospect of detection, has a greater ability to reduce the risk than the detection exercise itself. This is true for all cases except those in which the probabilty of detection is 1. Cases were developed for three different types of adversaries that can be distinguished from one another by the level of detection they are willing to tolerate before they are deterred from attempting a theft. By considering the effects of detection, deterrence, and adversary type, the ground work is laid for designing cost-effective insider threat-protection systems

  19. Projections of Flood Risk using Credible Climate Signals in the Ohio River Basin

    Science.gov (United States)

    Schlef, K.; Robertson, A. W.; Brown, C.

    2017-12-01

    Estimating future hydrologic flood risk under non-stationary climate is a key challenge to the design of long-term water resources infrastructure and flood management strategies. In this work, we demonstrate how projections of large-scale climate patterns can be credibly used to create projections of long-term flood risk. Our study area is the northwest region of the Ohio River Basin in the United States Midwest. In the region, three major teleconnections have been previously demonstrated to affect synoptic patterns that influence extreme precipitation and streamflow: the El Nino Southern Oscillation, the Pacific North American pattern, and the Pacific Decadal Oscillation. These teleconnections are strongest during the winter season (January-March), which also experiences the greatest number of peak flow events. For this reason, flood events are defined as the maximum daily streamflow to occur in the winter season. For each gage in the region, the location parameter of a log Pearson type 3 distribution is conditioned on the first principal component of the three teleconnections to create a statistical model of flood events. Future projections of flood risk are created by forcing the statistical model with projections of the teleconnections from general circulation models selected for skill. We compare the results of our method to the results of two other methods: the traditional model chain (i.e., general circulation model projections to downscaling method to hydrologic model to flood frequency analysis) and that of using the historic trend. We also discuss the potential for developing credible projections of flood events for the continental United States.

  20. Project Stride: An Equine-Assisted Intervention to Reduce Symptoms of Social Anxiety in Young Women.

    Science.gov (United States)

    Alfonso, Sarah V; Alfonso, Lauren A; Llabre, Maria M; Fernandez, M Isabel

    2015-01-01

    Although there is evidence supporting the use of equine-assisted activities to treat mental disorders, its efficacy in reducing signs and symptoms of social anxiety in young women has not been examined. We developed and pilot tested Project Stride, a brief, six-session intervention combining equine-assisted activities and cognitive-behavioral strategies to reduce symptoms of social anxiety. A total of 12 women, 18-29 years of age, were randomly assigned to Project Stride or a no-treatment control. Participants completed the Liebowitz Social Anxiety Scale at baseline, immediate-post, and 6 weeks after treatment. Project Stride was highly acceptable and feasible. Compared to control participants, those in Project Stride had significantly greater reductions in social anxiety scores from baseline to immediate-post [decrease of 24.8 points; t (9) = 3.40, P = .008)] and from baseline to follow-up [decrease of 31.8 points; t (9) = 4.12, P = .003)]. These findings support conducting a full-scale efficacy trial of Project Stride. Copyright © 2015 Elsevier Inc. All rights reserved.

  1. Reduced cancer risk in vegetarians: an analysis of recent reports

    Directory of Open Access Journals (Sweden)

    Amy Joy Lanou

    2010-12-01

    Full Text Available Amy Joy Lanou1, Barbara Svenson21Department of Health and Wellness, 2Ramsey Library, University of North Carolina Asheville, Asheville, NC, USAAbstract: This report reviews current evidence regarding the relationship between vegetarian eating patterns and cancer risk. Although plant-based diets including vegetarian and vegan diets are generally considered to be cancer protective, very few studies have directly addressed this question. Most large prospective observational studies show that vegetarian diets are at least modestly cancer protective (10%–12% reduction in overall cancer risk although results for specific cancers are less clear. No long-term randomized clinical trials have been conducted to address this relationship. However, a broad body of evidence links specific plant foods such as fruits and vegetables, plant constituents such as fiber, antioxidants and other phytochemicals, and achieving and maintaining a healthy weight to reduced risk of cancer diagnosis and recurrence. Also, research links the consumption of meat, especially red and processed meats, to increased risk of several types of cancer. Vegetarian and vegan diets increase beneficial plant foods and plant constituents, eliminate the intake of red and processed meat, and aid in achieving and maintaining a healthy weight. The direct and indirect evidence taken together suggests that vegetarian diets are a useful strategy for reducing risk of cancer.Keywords: diet, vegan, prevention

  2. Influence of the Risk-Contributing Factors on the Financing of the Investment Project for Building of Intelligent Buildings

    OpenAIRE

    Voytolovskiy Nikolay; Trebukhin Anatoliy; Shoshinov Vitaly

    2017-01-01

    This article provides the generic classification of risks of the investment projects for the construction of intelligent buildings which differ by the detachment of the subjective perception of risk by the investor. Risk and uncertainty were justified as system characteristics of the investment projects for the construction of intelligent buildings. Characteristics of the development was given in the context of project management. Methodical schemes of the development of the investment projec...

  3. Innovative Corporate Initiatives to Reduce Climate Risk: Lessons from East Asia

    Directory of Open Access Journals (Sweden)

    Edward B. Barbier

    2017-12-01

    Full Text Available Businesses, investors, and insurers are requiring better quantitative assessments of their exposure to climate risks and their impact on climate change. They are incorporating these assessments in their day-to-day management and long-term investment decisions. Already, there are efforts to develop international guidelines, common policies and legal frameworks for such assessments, as well as the desire to foster climate financing. We examine recent progress in East Asia and the rest of the world in setting targets, pricing policies, and other mechanisms to reduce climate risks. We develop a model that demonstrates how reduced climate risk management may lower the total cost of capital of firms, thus making them more attractive to investors. We discuss the additional policies needed to support improved climate risk management in investment decisions, private investments in climate science, technology and innovation (STI expansion, and more widespread adoption of climate financing and principles. Central banks, financial authorities, and governments can advance this objective by creating financial incentives to support investment decision-making. This would take into account factors such as improving climate performance, establishing better climate risk management and reporting requirements to foster green STI, and developing international guidelines and common policy and legal frameworks to support better climate risk management, assessments and reporting.

  4. Mixtures of beta distributions in models of the duration of a project affected by risk

    Science.gov (United States)

    Gładysz, Barbara; Kuchta, Dorota

    2017-07-01

    This article presents a method for timetabling a project affected by risk. The times required to carry out tasks are modelled using mixtures of beta distributions. The parameters of these beta distributions are given by experts: one corresponding to the duration of a task in stable conditions, with no risks materializing, and the other corresponding to the duration of a task in the case when risks do occur. Finally, a case study will be presented and analysed: the project of constructing a shopping mall in Poland.

  5. Landslide risk impact management and web services for improving resilience: the LIFE+IMAGINE project approach

    Science.gov (United States)

    Congi, Maria Pia; Campo, Valentina; Cipolloni, Carlo; Delmonaco, Giuseppe; Guerrieri, Luca; Iadanza, Carla; Spizzichino, Daniele; Trigila, Alessandro

    2014-05-01

    The increasing damage caused by natural disasters in the last decades points out the need for interoperable added-value services to support environmental safety and human protection, by reducing vulnerability of exposed elements as well as improving the resilience of the involved communities. For this reason, to provide access to harmonized and customized data is only one of several steps towards delivering adequate support to risk assessment, reduction and management. Scope of the present work is to illustrate a methodology under development for analysis of potential impacts in areas prone to landslide hazard in the framework of the EC project LIFE+IMAGINE. The project aims to implement an infrastructure based on web services for environmental analysis, that integrates in its own architecture specifications and results from INSPIRE, SEIS and GMES. Existing web services will be customized during the project to provide functionalities for supporting the environmental integrated management. The implemented infrastructure will be applied to landslide risk scenarios, to be developed in selected pilot areas, aiming at: i) application of standard procedures to implement a landslide risk analysis; ii) definition of a procedure for assessment of potential environmental impacts, based on a set of indicators to estimate the different exposed elements with their specific vulnerability in the pilot area. More in detail, the landslide pilot will be aimed at providing a landslide risk scenario through the implementation and analysis of: 1) a landslide inventory from available historical databases and maps; 2) landslide susceptibility and hazard maps; 3) assessment of exposure and vulnerability on selected typologies of elements at risk; 4) implementation of a landslide risk scenario for different sets of exposed elements (e.g. population, road network, residential area, cultural heritage). The pilot will be implemented in Liguria, Italy, in two different catchment areas located

  6. 工程项目的融资风险管理研究%Financing risk management research project

    Institute of Scientific and Technical Information of China (English)

    王永嘉; 陈璐

    2014-01-01

    The project financing risk management is a very important aspect of project management,in order to strengthen the management of the project financing risk,the paper detailed the financing risk management process describes the project,and the risk financing process analyzed simultaneously to find the financing process problems,and for the emergence of the problem,a project to promote the development of the main financing risk management measures,thus contributing to strengthen risk management and financing of the project.%工程项目的融资风险管理是工程项目管理的一个非常重要的方面,为了加强对工程项目融资风险的管理,本文详细的介绍工程项目的融资风险管理过程,并对融资过程中的风险进行了分析,同时找出了融资过程中出现的问题,并针对出现的问题,提出了促进工程项目融资风险管理发展的主要对策。

  7. Evaluating high risks in large-scale projects using an extended VIKOR method under a fuzzy environment

    Directory of Open Access Journals (Sweden)

    S. Ebrahimnejad

    2012-04-01

    Full Text Available The complexity of large-scale projects has led to numerous risks in their life cycle. This paper presents a new risk evaluation approach in order to rank the high risks in large-scale projects and improve the performance of these projects. It is based on the fuzzy set theory that is an effective tool to handle uncertainty. It is also based on an extended VIKOR method that is one of the well-known multiple criteria decision-making (MCDM methods. The proposed decision-making approach integrates knowledge and experience acquired from professional experts, since they perform the risk identification and also the subjective judgments of the performance rating for high risks in terms of conflicting criteria, including probability, impact, quickness of reaction toward risk, event measure quantity and event capability criteria. The most notable difference of the proposed VIKOR method with its traditional version is just the use of fuzzy decision-matrix data to calculate the ranking index without the need to ask the experts. Finally, the proposed approach is illustrated with a real-case study in an Iranian power plant project, and the associated results are compared with two well-known decision-making methods under a fuzzy environment.

  8. Effect of dietary habits on the risk of metabolic syndrome: Yazd Healthy Heart Project.

    Science.gov (United States)

    Sarebanhassanabadi, Mohammadtaghi; Mirhosseini, Seyed Jalil; Mirzaei, Masoud; Namayandeh, Seyedeh Mahdieh; Soltani, Mohammad Hossein; Pakseresht, Mohammadreza; Pedarzadeh, Ali; Baramesipour, Zahra; Faraji, Reza; Salehi-Abargouei, Amin

    2018-04-01

    Metabolic syndrome (MetS) refers to a group of risk factors that increase the risk of cardiovascular mortality and morbidity. Dietary habits are among the most important risk factors for MetS. The current study aimed at assessing the effect of dietary habits on the risk of MetS in a 10-year follow-up study in central Iran. Cohort study. Yazd, Iran. Participants aged 20-74 years without any history of MetS, who were originally recruited for Yazd Healthy Heart Project (YHHP) during 2005-2006, were revisited during 2015-2016. At phase I of YHHP, demographic data, anthropometric measurements, five components of MetS, biochemical tests and dietary habits were evaluated; and the same data were collected in phase II. A total of 1092 participants were eligible to be included in the present study. After follow-up, the 10-year cumulative incidence of MetS was 56·1 %. After adjustment for potential confounders, increased risk of MetS (hazard ratio; 95 % CI) was found in those who did not try to control their body weight (1·57; 1·06, 2·35), did not usually eat salad (1·91; 1·22, 3·00) and added salt to their food (1·57, 1·06, 2·33). These associations were stronger in men than in the total population after subgroup analysis, but were not present in women. Dietary habits affect the risk of MetS in the Iranian population. Lifestyle interventions are needed to improve dietary habits to reduce the risk of MetS. Future studies are highly recommended to confirm our results in other populations.

  9. Archipelago-wide island restoration in the Galápagos Islands: reducing costs of invasive mammal eradication programs and reinvasion risk.

    Directory of Open Access Journals (Sweden)

    Victor Carrion

    Full Text Available Invasive alien mammals are the major driver of biodiversity loss and ecosystem degradation on islands. Over the past three decades, invasive mammal eradication from islands has become one of society's most powerful tools for preventing extinction of insular endemics and restoring insular ecosystems. As practitioners tackle larger islands for restoration, three factors will heavily influence success and outcomes: the degree of local support, the ability to mitigate for non-target impacts, and the ability to eradicate non-native species more cost-effectively. Investments in removing invasive species, however, must be weighed against the risk of reintroduction. One way to reduce reintroduction risks is to eradicate the target invasive species from an entire archipelago, and thus eliminate readily available sources. We illustrate the costs and benefits of this approach with the efforts to remove invasive goats from the Galápagos Islands. Project Isabela, the world's largest island restoration effort to date, removed >140,000 goats from >500,000 ha for a cost of US$10.5 million. Leveraging the capacity built during Project Isabela, and given that goat reintroductions have been common over the past decade, we implemented an archipelago-wide goat eradication strategy. Feral goats remain on three islands in the archipelago, and removal efforts are underway. Efforts on the Galápagos Islands demonstrate that for some species, island size is no longer the limiting factor with respect to eradication. Rather, bureaucratic processes, financing, political will, and stakeholder approval appear to be the new challenges. Eradication efforts have delivered a suite of biodiversity benefits that are in the process of revealing themselves. The costs of rectifying intentional reintroductions are high in terms of financial and human resources. Reducing the archipelago-wide goat density to low levels is a technical approach to reducing reintroduction risk in the short

  10. Archipelago-wide island restoration in the Galápagos Islands: reducing costs of invasive mammal eradication programs and reinvasion risk.

    Science.gov (United States)

    Carrion, Victor; Donlan, C Josh; Campbell, Karl J; Lavoie, Christian; Cruz, Felipe

    2011-05-11

    Invasive alien mammals are the major driver of biodiversity loss and ecosystem degradation on islands. Over the past three decades, invasive mammal eradication from islands has become one of society's most powerful tools for preventing extinction of insular endemics and restoring insular ecosystems. As practitioners tackle larger islands for restoration, three factors will heavily influence success and outcomes: the degree of local support, the ability to mitigate for non-target impacts, and the ability to eradicate non-native species more cost-effectively. Investments in removing invasive species, however, must be weighed against the risk of reintroduction. One way to reduce reintroduction risks is to eradicate the target invasive species from an entire archipelago, and thus eliminate readily available sources. We illustrate the costs and benefits of this approach with the efforts to remove invasive goats from the Galápagos Islands. Project Isabela, the world's largest island restoration effort to date, removed >140,000 goats from >500,000 ha for a cost of US$10.5 million. Leveraging the capacity built during Project Isabela, and given that goat reintroductions have been common over the past decade, we implemented an archipelago-wide goat eradication strategy. Feral goats remain on three islands in the archipelago, and removal efforts are underway. Efforts on the Galápagos Islands demonstrate that for some species, island size is no longer the limiting factor with respect to eradication. Rather, bureaucratic processes, financing, political will, and stakeholder approval appear to be the new challenges. Eradication efforts have delivered a suite of biodiversity benefits that are in the process of revealing themselves. The costs of rectifying intentional reintroductions are high in terms of financial and human resources. Reducing the archipelago-wide goat density to low levels is a technical approach to reducing reintroduction risk in the short-term, and is being

  11. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  12. Evaluating Process Effectiveness to Reduce Risk

    Science.gov (United States)

    Shepherd, Christena C.

    2017-01-01

    It is well documented that government agencies do not have the same incentive as the private sector to focus on process effectiveness and continual improvement of those processes. It is also well documented whenever government agencies fail to deliver efficient, effective, consistent, and fair services to the citizens. In spite of the various "reinventing government" and "effectiveness initiatives" of the past decades, and in spite of the efforts on the part of many agencies to improve, government in general still lags behind industry in creating a culture of effective processes and systems. While the tragic events that unfolded recently in Flint, Michigan, teach us that running government "like a business" does not always take the needs of the citizenry into account, there are many lessons and techniques from the private sector that government agencies can use to improve. The incentive to improve, while mandated by various administrations1, needs to come from within the workforce, in order to effectively take root. The best, most effective incentive is to reduce, control or eliminate risk. Government agencies face some of the same risks as the private sector, while some are unique. While ISO 310002 has been around since 2009, risk has taken on increased visibility within the private sector with the advent of the emphasis on risk-based thinking in ISO 9001:20153. The relationship between risk-based thinking and effective processes is simple and direct. Those processes that are well thought out and standardized (i.e. Plan-Do-Check-Act), will have taken into account the applicable policy, statutory, regulatory, safety, quality and technical parameters, which may not occur to someone performing the process with minimal experience or training; and thus protect the employees, the public and the agency from statutory and regulatory violations; delay in providing services; non-delivery of services; harm to public or employee safety and health; cost overruns; breaches in

  13. Using detection and deterrence to reduce insider risk

    Energy Technology Data Exchange (ETDEWEB)

    Eggers, R F; Carlson, R L; Udell, C J

    1988-06-01

    This paper addresses a new concept of interaction between adversary detection and deterrence. It provides an initial evaluation of the effects of these variables on the risk of theft of special nuclear material by an insider adversary and can be extended to the sabotage threat. A steady-state risk equation is used. Exercises with this equation show that deterrence, resulting from the prospect of detection, has a greater ability to reduce the risk than the detection exercise itself. This is true for all cases except those in which the probability of detection is 1. Cases were developed for three different types of adversaries that can be distinguished from one another by the level of detection they are willing to tolerate before they are deterred from attempting a theft. By considering the effects of detection, deterrence, and adversary type, the ground work is laid for designing cost-effective insider threat-protection systems. 2 refs., 6 figs.

  14. DimeRisk Project: Development of an educational and training program for the prevention and mitigation of seismic risk in Spain

    Science.gov (United States)

    Martín-González, Fidel; Martín-Velazquez, Silvia; Giner-Robles, Jorge; Martínez-Díaz, Jose Jesus; Rodríguez-Pascua, Miguel Angel; Béjar, Marta; Pérez-López, Raul; López, Jose Antonio; Morales, Javier; Barranco, Ana; Palomo, Isabel

    2014-05-01

    In Spain, due to the low recurrence of earthquakes in the last century, there is no awareness of seismic risk and prevention plans. For this reason, moderate magnitude earthquakes have generated significant damage and casualties. However, the risk is evident, in Spain during the nineteenth century there were more than five destructive earthquakes with intensities greater than VIII (e.g. Arenas del Rey IX-X, Torrevieja IX-X). A recent example was the 2011 Lorca earthquake, that with moderate magnitudes and intensities (magnitude Mw 5.2, intensity VI) it struck a populated area with old historic buildings and a population unprepared (9 victims, 324 injured, 1,200 million in reparations). In this earthquake many errors were found in the behavior of the population and in the basic self-protection measures. Many countries have educational programs that significantly reduce the damage and losses caused by earthquakes. The objective of this project (Dimerisk project) is to generate training and educational materials that help mitigate the damage and losses caused by earthquakes. This project is based on plans of experienced countries (e.g. U.S.A., Italy, Mexico, New Zealand) but having into account the mistakes made in the last earthquake in Spain, and also the characteristics of the Spanish educational system and building characteristics. This project has been founded by FUNDACION MAPFRE. The team is formed by geologist, earthquake researchers and teachers at secondary schools and universities. The ultimate goal is to generate material that can inform about the seismic and geological processes that participate in an earthquake and the basics of self-protection against earthquakes. This project has focused on scenarios (offices, factories, homes, education centers) and educational levels (schools, colleges and universities). Educational materials have been also developed for different educational levels with basic concepts related to seismicity, how to behave during an

  15. Risk transfer via energy-savings insurance

    International Nuclear Information System (INIS)

    Mills, Evan

    2003-01-01

    Among the key barriers to investment in energy efficiency are uncertainties about attaining projected energy savings and potential disputes over stipulated savings. The fields of energy management and risk management are thus intertwined. While many technical methods have emerged to manage performance risks (e.g. building diagnostics and commissioning), financial methods are less developed in the energy management arena than in other segments of the economy. Energy-savings insurance (ESI) - formal insurance of predicted energy savings - transfers and spreads both types of risk over a larger pool of energy efficiency projects and reduces barriers to market entry of smaller energy service firms who lack sufficiently strong balance sheets to self-insure the savings. ESI encourages those implementing energy-saving projects to go beyond standard measures and thereby achieve more significant levels of energy savings. Insurance providers are proponents of improved savings measurement and verification techniques, as well as maintenance, thereby contributing to national energy-saving objectives. If properly applied, ESI can potentially reduce the net cost of energy-saving projects by reducing the interest rates charged by lenders, and by increasing the level of savings through quality control. Governmental agencies have been pioneers in the use of ESI and could continue to play a role

  16. Reduced 25-hydroxyvitamin D and risk of Alzheimer's disease and vascular dementia

    DEFF Research Database (Denmark)

    Afzal, Shoaib; Bojesen, Stig E; Nordestgaard, Børge G

    2014-01-01

    BACKGROUND: Vitamin D deficiency has been implicated as a risk factor for dementia in several cross-sectional studies. We tested the hypothesis that reduced plasma 25-hydroxyvitamin D (25[OH]D) is associated with increased risk of Alzheimer's disease (AD) and vascular dementia in the general.......28 (95% CI, 1.00-1.64) for 25(OH)D less than 25 nmol/L vs. greater than or equal to 50 nmol/L, and 1.27 (95% CI, 1.01-1.60) for less than the 25th vs. more than the 50th seasonally adjusted 25(OH)D. CONCLUSIONS: We observed an association of reduced plasma 25(OH)D with increased risk of the combined end...

  17. Economics of biofiltration for remediation projects

    International Nuclear Information System (INIS)

    Yudelson, J.M.; Tinari, P.D.

    1995-01-01

    Biofilters with granular activated carbon (GAC) filter backup units offer substantial savings compared to conventional GAC filters and catalytic/thermal oxidation (Catox) units in controlling emissions of volatile organic compounds (VOCs) from petroleum remediation projects. Provided that the biofilter supplier is willing to satisfy the client's and consultant's risk-management concerns, biofilters offer anew method for reducing the cost of remediation projects, with savings of up to $10,000 (24%) per facility in 24-month projects and up to $16,000 (32%) per facility in 36-month projects for simple gas station remediation projects. Savings will be greater for longer projects and projects with higher average contaminant loadings

  18. The formation of a risk management system for projects in the field of aquaculture innovative development in the Kaliningrad region: a case study

    Directory of Open Access Journals (Sweden)

    Serbulov Alexey

    2012-03-01

    Full Text Available This article sets out to develop the concept and the principal scheme of the formation of a risk management system for innovative economic development projects in the field of aquaculture. The research carried out by the authors helps identify the main problems and characteristics of risk management projects for the development of aquaculture in presentday Russia. The authors outline the status and features of aquaculture development projects in the North-western federal district and the Kaliningrad region. The article formulates and justifies the concept of “risk management projects in innovative development of aquaculture in the region” focusing on the classification of aquaculture risks in relation to innovative development projects, which expands the conceptual framework of risk management in view of the specific risks relating to economic development projects in the field of aquaculture. The authors characterize modern methods and approaches to risk management projects and organizations in the context of their application in the framework of aquaculture development projects and offer mechanisms for risk management of aquaculture development projects, which make it possible to include risk management activity in the general context of activities of parent project organizations. The authors develop the concept and principal scheme of the formation of risk management system for innovative development projects in aquaculture.

  19. Risk factors of cardiovascular diseases in Bushehr Port on the basis of The WHO MONICA Project The Persian Gulf Healthy Heart Project

    Directory of Open Access Journals (Sweden)

    Mohammad Amiri

    2004-02-01

    Full Text Available The majority of all deaths attributable to cardiovascular diseases (CVDs are in developing countries. There is now a pressing need for developing countries to define and implement preventive interventions for CVDs. We used WHO MONICA Project protocols to measure trends in coronary risk factors in Bushehr Port in the Persian Gulf Healthy Heart Project. Coronary risk factors of 2092 , aged >= 25 years men and women were evaluated in a cross-sectional study. Of the studied population, 97.7% had at least one coronary risk factor, 44.3% of men and 69% of women had at least two coronary risk factors. The high prevalence rates of diabetes mellitus (8.6%, central obesity (59.4%, obesity (26.8%, hypertension (24.5%, smoking (15.7%, physical inactivity (71.1%, hypercholesterolemia (24% and low HDL-cholesterol (61.5% showed that coronary risk factors prevail in Bushehr Port. Therefore, preventive strategies should be implemented immediately to avoid cardiovascular epidemic in the near future.

  20. Evaluation of a constipation risk assessment scale.

    Science.gov (United States)

    Zernike, W; Henderson, A

    1999-06-01

    This project was undertaken in order to evaluate the utility of a constipation risk assessment scale and the accompanying bowel management protocol. The risk assessment scale was primarily introduced to teach and guide staff in managing constipation when caring for patients. The intention of the project was to reduce the incidence of constipation in patients during their admission to hospital.

  1. Reduced risk HTGR concept for industrial heat application

    International Nuclear Information System (INIS)

    Boardman, C.E.; Lipps, A.J.

    1982-01-01

    The industrial process heat market has been identified as major market for the High Temperature Gas-Cooled Reactor (HTGR), however, this market introduces stringent availability requirements on the reactor system relative to electric plants which feed a large existing grid. The characteristics and requirements of the industrial heat markets are summarized; the risks associated with serving this market with a single large HTGR will be discussed; and the modular concept, which has the potential to reduce both safety and investment risks, will be described. The reference modular concept described consists of several small, relatively benign nuclear heat sources linked together to supply heat energy to a balance-of-plant incorporating a process gas train/thermochemical pipe line system and a normal steam-electric plant

  2. Project Management Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1995-04-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S ampersand M) and as quickly and economically as possible. Implementation and completion of the deactivation project will further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S ampersand M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities, that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project

  3. Randomized Trial of Reducing Ambulatory Malpractice and Safety Risk: Results of the Massachusetts PROMISES Project.

    Science.gov (United States)

    Schiff, Gordon D; Reyes Nieva, Harry; Griswold, Paula; Leydon, Nicholas; Ling, Judy; Federico, Frank; Keohane, Carol; Ellis, Bonnie R; Foskett, Cathy; Orav, E John; Yoon, Catherine; Goldmann, Don; Weissman, Joel S; Bates, David W; Biondolillo, Madeleine; Singer, Sara J

    2017-08-01

    Evaluate application of quality improvement approaches to key ambulatory malpractice risk and safety areas. In total, 25 small-to-medium-sized primary care practices (16 intervention; 9 control) in Massachusetts. Controlled trial of a 15-month intervention including exposure to a learning network, webinars, face-to-face meetings, and coaching by improvement advisors targeting "3+1" high-risk domains: test result, referral, and medication management plus culture/communication issues evaluated by survey and chart review tools. Chart reviews conducted at baseline and postintervention for intervention sites. Staff and patient survey data collected at baseline and postintervention for intervention and control sites. Chart reviews demonstrated significant improvements in documentation of abnormal results, patient notification, documentation of an action or treatment plan, and evidence of a completed plan (all Pcoaches, and learning network decreased selected ambulatory safety risks often seen in malpractice claims.

  4. Selection of Investment Projects by Monte Carlo Method in Risk Condition

    Directory of Open Access Journals (Sweden)

    M. E.

    2017-12-01

    Full Text Available The Monte Carlo method (also known as the Monte Carlo simulation was proposed by Nicholas Metropolis, S. Ulam and Jhon Von Neiman in 50-th years of the past century. The method can be widely applied to analysis of investment projects due to the advantages recognized both by practitioners and the academic community. The balance model of a project with discounted financial flows has been implemented for Microsoft Excel and Google Docs spread-sheet solutions. The Monte Carlo method for project with low and high correlated net present value (NPV parameters in the environment of the electronic tables of MS Excel/Google Docs. A distinct graduation of risk was identified. A necessity of account of correlation effects and the use of multivariate imitation during the project selection has been demonstrated.

  5. A Successful ED Fall Risk Program Using the KINDER 1 Fall RiskAssessment Tool.

    Science.gov (United States)

    Townsend, Ann B; Valle-Ortiz, Marisol; Sansweet, Tracy

    2016-11-01

    Emergency nurses did not perform falls risk assessments routinely on our ED patients; the instrument used was aimed at inpatients. We identified a need to revise fall assessment practices specific to our emergency department. The purpose of the performance improvement project was to reduce ED falls and evaluate the use of an ED-specific fall risk tool, the KINDER 1 Fall Risk Assessment. The plan was to establish fall risk assessment practices at point of ED entry and to decrease total falls. We retrospectively reviewed ED fall data for each quarter of 2013, which included risk assessments scores, the total number of falls, and the circumstances of each fall. Using Kotter's framework to guide a successful change process, we implemented the KINDER 1 to assess fall risk. During the first 4 weeks of the project, 937 patients (27%) were identified as high risk for falls using the KINDER 1. During the subsequent 3 quarters, the total number of falls decreased; reported falls without injuries dropped from 0.21 to 0.07 per 1000 patients, and falls with injuries were reduced from 0.21 to 0.0 per 1000 patients. The results of this project represented a valuable step toward achieving our goal to keep ED patients safe from injuries as a result of falls. The findings add to the body of nursing knowledge on the application of clinical-based performance improvement projects to improve patient outcomes and to provide data on the use of the KINDER 1 tool, which has not been extensively tested. Copyright © 2016 Emergency Nurses Association. Published by Elsevier Inc. All rights reserved.

  6. Reducing e-commerce risks using digital certificates

    Directory of Open Access Journals (Sweden)

    Piščević Miloš

    2009-01-01

    Full Text Available E-commerce means buying and selling goods and services across the Internet. Secured communication in e-commerce, across unsecured medium, such as the Internet, represents one of the major components in a domain of providing necessary security- critical demands, so the flow of information could go in a secure way. The Internet, as a global computer network must provide five major security services: confidentiality, data integrity, authentication, availability, and non-repudiation of information. Without guaranteeing aformentioned security goals, risks may be very high in e-commerce systems. A possible way to reduce these risks is to use digital certificates. Digital certificates provide a means of proving identity in electronic transactions, and from the point of view of computer communication they are irreplacable, but nevertheless they provide a good mechanism for implementing the major part of this security goal, and therefore, their usage in e-commerce is the major topic of this paper.

  7. Academy of Program/Project & Engineering Leadership Orbital Debris Management and Risk Mitigation

    Data.gov (United States)

    National Aeronautics and Space Administration — The NASA Academy of Program/Project & Engineering Leadership (APPEL) is excited to announce the public release of Orbital Debris Management and Risk Mitigation,...

  8. Enterprise Content Management Implementation and Risk

    Directory of Open Access Journals (Sweden)

    Jaroslava Klegová

    2015-01-01

    Full Text Available Enterprise Content Management (ECM solutions are commonly used in many areas such as document management, record management, digital asset management, etc. Key features of ECM systems are capturing, indexing, preserving and retrieving of digital information. The state-of-the- art ECM solution can help revolutionize document management and further automated business processes which can lead to better decisions and competitive advantage. Risk management can reduce project failure and that is why controlling risk in ECM implementation projects is considered to be a major contributor to project success. To manage software risk, the first step is to identify a list of ECM projects’ risks. The present paper provides an overview of ECM implementation risks and contains findings from a small survey on experience of ECM implementation and risk in Czech enterprises. Risk of implementation in the public sector is discussed more deeply with case study examples.

  9. A Clinical Nurse Specialist-Led Interprofessional Quality Improvement Project to Reduce Hospital-Acquired Pressure Ulcers.

    Science.gov (United States)

    Fabbruzzo-Cota, Christina; Frecea, Monica; Kozell, Kathryn; Pere, Katalin; Thompson, Tamara; Tjan Thomas, Julie; Wong, Angela

    2016-01-01

    The purpose of this clinical nurse specialist-led interprofessional quality improvement project was to reduce hospital-acquired pressure ulcers (HAPUs) using evidence-based practice. Hospital-acquired pressure ulcers (PUs) have been linked to morbidity, poor quality of life, and increasing costs. Pressure ulcer prevention and management remain a challenge for interprofessional teams in acute care settings. Hospital-acquired PU rate is a critical nursing quality indicator for healthcare organizations and ties directly with Mount Sinai Hospital's (MSH's) mission and vision, which mandates providing the highest quality care to patients and families. This quality improvement project, guided by the Donabedian model, was based on the Registered Nurses' Association of Ontario Best Practice Guideline Risk Assessment & Prevention of Pressure Ulcers. A working group was established to promote evidence-based practice for PU prevention. Initiatives such as documentation standardization, development of staff education and patient and family educational resources, initiation of a hospital-wide inventory for support surfaces, and procurement of equipment were implemented to improve PU prevention and management across the organization. An 80% decrease in HAPUs has been achieved since the implementation of best practices by the Best Practice Guideline Pressure Ulcer working group. The implementation of PU prevention strategies led to a reduction in HAPU rates. The working group will continue to work on building interprofessional awareness and collaboration in order to prevent HAPUs and promote an organizational culture that supports staff development, teamwork and communication. This quality improvement project is a successful example of an interprofessional clinical nurse specialist-led initiative that impacts patient/family and organization outcomes through the identification and implementation of evidence-based nursing practice.

  10. Reducing the health risks from radon in the UK overground workplace

    International Nuclear Information System (INIS)

    Denman, A.R.

    2008-01-01

    In response to the potential health risk from radon in workplaces in the United Kingdom (UK), the Ionising Radiations Regulations 1999 include the protection of workers from excessive radon levels. Under the Management of Health and Safety at Work Regulations 1999, employers are required to make risk assessments for potential hazards in the workplace. This is taken to apply to the risk from radon in premises in areas where over 1% of domestic housing properties have average annual radon levels over the Action Level. Whilst the UK Action Level in domestic housing has been set at 200 Bq·m -3 , the workplace limit is 400 Bq·m -3 . The Regulations require that this limit be compared to a 24-hour winter maximum, while in domestic properties the annual average radon level is compared to the Action Level. This paper discusses the application of the Regulations in the UK to ensure compliance and reduce risk from radon in the workplace, include use of short-term measurements, and the consideration of seasonal variation. Reduction of radon levels can be achieved by methods similar to those in domestic properties, but, in large buildings, several sump/pump systems may be required. Case studies have shown that the sump/pump system preferentially reduces radon levels at night, when workers are not usually present. Thus to achieve a significant health benefit the average radon level should be reduced below 325 Bq·m -3 . (author)

  11. CLIMB - Climate induced changes on the hydrology of mediterranean basins - Reducing uncertainties and quantifying risk

    Science.gov (United States)

    Ludwig, Ralf

    2010-05-01

    According to future climate projections, Mediterranean countries are at high risk for an even pronounced susceptibility to changes in the hydrological budget and extremes. These changes are expected to have severe direct impacts on the management of water resources. Threats include severe droughts and extreme flooding, salinization of coastal aquifers, degradation of fertile soils and desertification due to poor and unsustainable water management practices. It can be foreseen that, unless appropriate adaptation measures are undertaken, the changes in the hydrologic cycle will give rise to an increasing potential for tension and conflict among the political and economic actors in this vulnerable region. The presented project initiative CLIMB, funded under EC's 7th Framework Program (FP7-ENV-2009-1), has started in January 2010. In its 4-year design, it shall analyze ongoing and future climate induced changes in hydrological budgets and extremes across the Mediterranean and neighboring regions. This is undertaken in study sites located in Sardinia, Northern Italy, Southern France, Tunisia, Egypt and the Palestinian-administered area Gaza. The work plan is targeted to selected river or aquifer catchments, where the consortium will employ a combination of novel field monitoring and remote sensing concepts, data assimilation, integrated hydrologic (and biophysical) modeling and socioeconomic factor analyses to reduce existing uncertainties in climate change impact analysis. Advanced climate scenario analysis will be employed and available ensembles of regional climate model simulations will be downscaling. This process will provide the drivers for an ensemble of hydro(-geo)logical models with different degrees of complexity in terms of process description and level of integration. The results of hydrological modeling and socio-economic factor analysis will enable the development of a GIS-based Vulnerability and Risk Assessment Tool. This tool will serve as a platform

  12. Advanced Seismic Probabilistic Risk Assessment Demonstration Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Coleman, Justin [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    Idaho National Laboratories (INL) has an ongoing research and development (R&D) project to remove excess conservatism from seismic probabilistic risk assessments (SPRA) calculations. These risk calculations should focus on providing best estimate results, and associated insights, for evaluation and decision-making. This report presents a plan for improving our current traditional SPRA process using a seismic event recorded at a nuclear power plant site, with known outcomes, to improve the decision making process. SPRAs are intended to provide best estimates of the various combinations of structural and equipment failures that can lead to a seismic induced core damage event. However, in general this approach has been conservative, and potentially masks other important events (for instance, it was not the seismic motions that caused the Fukushima core melt events, but the tsunami ingress into the facility).

  13. Acid-reducing vagotomy is associated with reduced risk of subsequent ischemic heart disease in complicated peptic ulcer: An Asian population study.

    Science.gov (United States)

    Wu, Shih-Chi; Fang, Chu-Wen; Chen, William Tzu-Liang; Muo, Chih-Hsin

    2016-12-01

    Persistent exacerbation of a peptic ulcer may lead to a complicated peptic ulcer (perforation or/and bleeding). The management of complicated peptic ulcers has shifted from acid-reducing vagotomy, drainage, and gastrectomy to simple local suture or non-operative (endoscopic/angiographic) hemostasis. We were interested in the long-term effects of this trend change. In this study, complicated peptic ulcer patients who received acid-reducing vagotomy were compared with those who received simple suture/hemostasis to determine the risk of ischemic heart disease (IHD).This retrospective cohort study analyzed 335,680 peptic ulcer patients recorded from 2000 to 2006 versus 335,680 age-, sex-, comorbidity-, and index-year matched comparisons. Patients with Helicobacter pylori (HP) infection were excluded. In order to identify the effect of vagus nerve severance, patients who received gastrectomy or antrectomy were also excluded. The incidence of IHD in both cohorts, and in the complicated peptic ulcer patients who received acid-reducing vagotomy versus those who received simple suture or hemostasis was evaluated.The overall incidence of IHD was higher in patients with peptic ulcer than those without peptic ulcer (17.00 vs 12.06 per 1000 person-years), with an adjusted hazard ratio (aHR) of 1.46 based on multivariable Cox proportional hazards regression analysis controlling for age, sex, Charlson's comorbidity index, and death (competing risk). While comparing peptic ulcer patients with acid-reducing vagotomy to those with simple suture/hemostasis or those without surgical treatment, the aHR (0.58) was the lowest in the acid-reducing vagotomy group.Patients with peptic ulcer have an elevated risk of IHD. However, complicated peptic ulcer patients who received acid-reducing vagotomy were associated with reduced risk of developing IHD.

  14. Alternative techniques for environmental project management

    International Nuclear Information System (INIS)

    Reeves, S.

    1994-01-01

    Beginning in the late 1970s and early 1980s, increased regulation and recognition of ground water as an important natural resource led industry to address subsurface contamination at many sites. This caused the industry's dependence on environmental consultants to increase drastically. Initially, the accepted practice for addressing environmental concerns was to rely upon consultants to determine appropriate work scope, budgets, procedures and regulatory interaction. While significant advances have been made in technology and consulting services, improvement in project management and cost containment have been limited. In order to effectively manage environmental projects, it is imperative that business risks and standardized project management practices be factored into environmental solutions. A standardized environmental project management program was developed and applied to projects at petroleum marketing facilities throughout the United States. Following development and implementation, detailed studies were conducted to measure the value of standardization in reducing costs and enhancing efficiencies. The results indicate significant improvement in both reducing project costs and in enhancing the efficiency of consultants

  15. Integrating risk management into the baselining process

    International Nuclear Information System (INIS)

    Jennett, N.; Tonkinson, A.

    1994-01-01

    These processes work together in building the project (comprised of the technical, schedule, and cost baselines) against which performance is measured and changes to the scope, schedule and cost of a project are managed and controlled. Risk analysis is often performed as the final element of the scheduling or estimating processes, a precursor to establishing cost and schedule contingency. However, best business practices dictate that information that may be crucial to the success of a project be analyzed and incorporated into project planning as soon as it is available and usable. The purpose or risk management is not to eliminate risk. Neither is it intended to suggest wholesale re-estimating and re-scheduling of a project. Rather, the intent is to make provisions to reduce and control the schedule and/or cost ramifications of risk by anticipating events and conditions that cannot be reliably planned for and which have the potential to negatively impact accomplishment of the technical objectives and requirements of the project

  16. A quality improvement project to reduce hypothermia in infants undergoing MRI scanning

    International Nuclear Information System (INIS)

    Dalal, Priti G.; Parekh, Uma; Dhar, Padmani; McQuillan, Patrick M.; Porath, Janelle; Mujsce, Dennis; Wang, Ming; Hulse, Michael

    2016-01-01

    Hypothermia prevention strategies during MRI scanning under general anesthesia in infants may pose a challenge due to the MRI scanner's technical constraints. Previous studies have demonstrated conflicting results related to increase or decrease in post-scan temperatures in children. We noted occurrences of post-scan hypothermia in anesthetized infants despite the use of routine passive warming techniques. The aims of our quality improvement project were (a) to identify variables associated with post-scan hypothermia in infants and (b) to develop and implement processes to reduce occurrence of hypothermia in neonatal intensive care unit (NICU) infants undergoing MRI. One hundred sixty-four infants undergoing MRI scanning were prospectively audited for post-scan body temperatures. A multidisciplinary team identified potential variables associated with post-scan hypothermia and designed preventative strategies: protocol development, risk factor identification, vigilance and use of a vacuum immobilizer. Another audit was performed, specifically focusing on NICU infants. In the initial phase, we found that younger age (P = 0.002), lower weight (P = 0.005), lower pre-scan temperature (P < 0.01), primary anesthetic technique with propofol (P < 0.01), advanced airway devices (P = 0.02) and being in the NICU (P < 0.01) were associated with higher odds for developing post-scan decrease in body temperature. Quality improvement processes decreased the occurrence of hypothermia in NICU infants undergoing MRI scanning from 65% to 18% (95% confidence interval for the difference, 26-70%, P < 0.001). Several variables, including being in the NICU, are associated with a decrease in post-scan temperature in infants undergoing MRI scanning under sedation/general anesthesia. Implementation of strategies to prevent hypothermia in infants may be challenging in the high-risk MRI environment. We were able to minimize this problem in clinical practice by applying quality improvement

  17. Shadow management applied in the first AP1000 project under the islands contract condition

    International Nuclear Information System (INIS)

    Liu Xiao

    2010-01-01

    As the global first AP1000 nuclear project, Sanmen phase I nuclear project itself has many challenges from design, procurement to construction managements for non practical nuclear project and experience can be referenced. Islands contract pattern was adopted by this project and this contract pattern has its own strength and weakness. Considering the negative influence result from the first unit, this project has the great postpone risk. Shadow management here tries to reduce these risks and enhance the project surveillance and control by the owner to promote the final goal of this project. (authors)

  18. Performance Risks Allocation in Bot Infrastructure in Nigeria: A Case Study of Lagos Infrastructure Project

    Directory of Open Access Journals (Sweden)

    Sanni Gabriel A.

    2017-08-01

    Full Text Available The study assessed allocation, criteria and allotment effectiveness of performance risks in Build- Operate-Transfer (BOT transportation infrastructure in Nigeria using Lagos Infrastructure Project (LIP as a case study. LIP is the only BOT-procured tolled road that has attained ‘operate’ stage of BOT cycle in Nigeria. It revealed that more operating risks were actually allocated to the concessionaire than the grantor and most of the risks were preferred retained by the allottee. Significant fraction of the risks was effectively allocated between the concessionaire and grantor except those that involve close interface between participants. While grantor rated nine risks high and seven risks very high; the concessionaire assessed nine risks to be high and five risks to be very high; the grantor rated the effectiveness level to be seventy three per cent and the concessionaire assessed it to be sixty four per cent. The study recommended that the evolving knowledge from Lagos Infrastructure Project (LIP should be documented to guide future BOT transactions in Nigeria.

  19. Research on Investment Risk Management of Chinese Prefabricated Construction Projects Based on a System Dynamics Model

    Directory of Open Access Journals (Sweden)

    Ming Li

    2017-09-01

    Full Text Available Prefabricated construction, a new direction for the future development of the Chinese construction industry, can maximize the requirements of “green”. As a new form of green building, prefabricated construction is of particular interest. On account of the immature development of the green building market in China, the investment risk for prefabricated construction is higher than for traditional architecture. Hence, it is especially important to improve its investment risk identification and management. This study adopts system dynamics and builds a risk identification feedback chart and risk flow chart, to comprehensively identify investment risks that projects in China may face and to process quantitative estimation of investment risk factors. Key factors influencing project investment risks are found, and corresponding measures are pointedly proposed. This paper may provide guidance and a reference for promoting the sound development of prefabricated construction in China.

  20. Medical Data Architecture Project Status

    Science.gov (United States)

    Krihak, M.; Middour, C.; Lindsey, A.; Marker, N.; Wolfe, S.; Winther, S.; Ronzano, K.; Bolles, D.; Toscano, W.; Shaw, T.

    2017-01-01

    The Medical Data Architecture (MDA) project supports the Exploration Medical Capability (ExMC) risk to minimize or reduce the risk of adverse health outcomes and decrements in performance due to in-flight medical capabilities on human exploration missions. To mitigate this risk, the ExMC MDA project addresses the technical limitations identified in ExMC Gap Med 07: We do not have the capability to comprehensively process medically-relevant information to support medical operations during exploration missions. This gap identifies that the current International Space Station (ISS) medical data management includes a combination of data collection and distribution methods that are minimally integrated with on-board medical devices and systems. Furthermore, there are variety of data sources and methods of data collection. For an exploration mission, the seamless management of such data will enable an increasingly autonomous crew than the current ISS paradigm. The MDA will develop capabilities that support automated data collection, and the necessary functionality and challenges in executing a self-contained medical system that approaches crew health care delivery without assistance from ground support. To attain this goal, the first year of the MDA project focused on reducing technical risk, developing documentation and instituting iterative development processes that established the basis for the first version of MDA software (or Test Bed 1). Test Bed 1 is based on a nominal operations scenario authored by the ExMC Element Scientist. This narrative was decomposed into a Concept of Operations that formed the basis for Test Bed 1 requirements. These requirements were successfully vetted through the MDA Test Bed 1 System Requirements Review, which permitted the MDA project to begin software code development and component integration. This paper highlights the MDA objectives, development processes, and accomplishments, and identifies the fiscal year 2017 milestones and

  1. Common risks affecting time overrun in road construction projects in Palestine: Contractors’ perspective

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2013-06-01

    Full Text Available The construction sector is one of the key economic sectors and is the main force motivating the Palestinian national economy. However, it suffers from number of problems that affect time, cost and quality performances. This study aims at identifying the common risks affecting time overrun in road construction projects in the West Bank in Palestine from contractors’ viewpoint. 45 factors that might cause delays of road construction projects were defined through a detailed literature review. A questionnaire survey was performed to rank the considered factors in terms of severity and frequency. The analysis of the survey indicated that the top risks affecting time overrun in road construction projects in Palestine are: financial status of the contractors, payments delay by the owner, political situation, segmentation of the West Bank, poor communication between construction parties, lack of equipment efficiency, and high competition in bids.

  2. The prostate cancer risk stratification (ProCaRS) project: Recursive partitioning risk stratification analysis

    International Nuclear Information System (INIS)

    Rodrigues, George; Lukka, Himu; Warde, Padraig; Brundage, Michael; Souhami, Luis; Crook, Juanita; Cury, Fabio; Catton, Charles; Mok, Gary; Martin, Andre-Guy; Vigneault, Eric; Morris, Jim; Warner, Andrew; Gonzalez Maldonado, Sandra; Pickles, Tom

    2013-01-01

    Background: The Genitourinary Radiation Oncologists of Canada (GUROC) published a three-group risk stratification (RS) system to assist prostate cancer decision-making in 2001. The objective of this project is to use the ProCaRS database to statistically model the predictive accuracy and clinical utility of a proposed new multi-group RS schema. Methods: The RS analyses utilized the ProCaRS database that consists of 7974 patients from four Canadian institutions. Recursive partitioning analysis (RPA) was utilized to explore the sub-stratification of groups defined by the existing three-group GUROC scheme. 10-fold cross-validated C-indices and the Net Reclassification Index were both used to assess multivariable models and compare the predictive accuracy of existing and proposed RS systems, respectively. Results: The recursive partitioning analysis has suggested that the existing GUROC classification system could be altered to accommodate as many as six separate and statistical unique groups based on differences in BFFS (C-index 0.67 and AUC 0.70). GUROC low-risk patients would be divided into new favorable-low and low-risk groups based on PSA ⩽6 and PSA >6. GUROC intermediate-risk patients can be subclassified into low-intermediate and high-intermediate groups. GUROC high-intermediate-risk is defined as existing GUROC intermediate-risk with PSA >=10 AND either T2b/c disease or T1T2a disease with Gleason 7. GUROC high-risk patients would be subclassified into an additional extreme-risk group (GUROC high-risk AND (positive cores ⩾87.5% OR PSA >30). Conclusions: Proposed RS subcategories have been identified by a RPA of the ProCaRS database

  3. A Randomised Controlled Trial to Reduce Sedentary Time in Young Adults at Risk of Type 2 Diabetes Mellitus: Project STAND (Sedentary Time ANd Diabetes.

    Directory of Open Access Journals (Sweden)

    Stuart J H Biddle

    Full Text Available Type 2 diabetes mellitus (T2DM, a serious and prevalent chronic disease, is traditionally associated with older age. However, due to the rising rates of obesity and sedentary lifestyles, it is increasingly being diagnosed in the younger population. Sedentary (sitting behaviour has been shown to be associated with greater risk of cardio-metabolic health outcomes, including T2DM. Little is known about effective interventions to reduce sedentary behaviour in younger adults at risk of T2DM. We aimed to investigate, through a randomised controlled trial (RCT design, whether a group-based structured education workshop focused on sitting reduction, with self-monitoring, reduced sitting time.Adults aged 18-40 years who were either overweight (with an additional risk factor for T2DM or obese were recruited for the Sedentary Time ANd Diabetes (STAND RCT. The intervention programme comprised of a 3-hour group-based structured education workshop, use of a self-monitoring tool, and follow-up motivational phone call. Data were collected at three time points: baseline, 3 and 12 months after baseline. The primary outcome measure was accelerometer-assessed sedentary behaviour after 12 months. Secondary outcomes included other objective (activPAL and self-reported measures of sedentary behaviour and physical activity, and biochemical, anthropometric, and psycho-social variables.187 individuals (69% female; mean age 33 years; mean BMI 35 kg/m2 were randomised to intervention and control groups. 12 month data, when analysed using intention-to-treat analysis (ITT and per-protocol analyses, showed no significant difference in the primary outcome variable, nor in the majority of the secondary outcome measures.A structured education intervention designed to reduce sitting in young adults at risk of T2DM was not successful in changing behaviour at 12 months. Lack of change may be due to the brief nature of such an intervention and lack of focus on environmental change

  4. Review and Necessity of Recognizing Risk Management in Civil Projects and Contracts

    OpenAIRE

    VOSOUGHI, Pouyan; VOSOUGHI, Vandad

    2015-01-01

    Proper risk management is the reason for which risk (and its various types) is assigned to that section that is able to manage it in the best way but is the section which is able to manage the risk in the best way the same party that has the most effect on the probability of an adverse occurrence or is the section that is able to manage the results in the best way after the adverse occurrence. Now by considering the size, nature and complexity of the projects, the necessity of having the tech...

  5. The longevity risk of the Dutch Actuarial Association’s projection model

    NARCIS (Netherlands)

    F. Peters (Frederick); W.J. Nusselder (Wilma); J.P. Mackenbach (Johan)

    2012-01-01

    markdownabstractAccurate assessment of the risk that arises from further increases in life expectancy is crucial for the financial sector, in particular for pension funds and life insurance companies. The Dutch Actuarial Association presented a revised projection model in 2010, while in the same

  6. Preconceptional motivational interviewing interventions to reduce alcohol-exposed pregnancy risk.

    Science.gov (United States)

    Ingersoll, Karen S; Ceperich, Sherry D; Hettema, Jennifer E; Farrell-Carnahan, Leah; Penberthy, J Kim

    2013-04-01

    Alcohol exposed pregnancy (AEP) is a leading cause of preventable birth defects. While randomized controlled trials (RCTs) have shown that multi-session motivational interviewing-based interventions reduce AEP risk, a one-session intervention could facilitate broader implementation. The purposes of this study were to: (1) test a one-session motivational AEP prevention intervention for community women and (2) compare outcomes to previous RCTs. Participants at risk for AEP (N=217) were randomized to motivational interviewing+assessment feedback (EARLY), informational video, or informational brochure conditions. Outcomes were drinks per drinking day (DDD), ineffective contraception rate, and AEP risk at 3 and 6 months. All interventions were associated with decreased DDD, ineffective contraception rate, and AEP risk. Participants who received EARLY had larger absolute risk reductions in ineffective contraception and AEP risk, but not DDD. Effect sizes were compared to previous RCTs. The one-session EARLY intervention had less powerful effects than multi-session AEP prevention interventions among community women, but may provide a new option in a continuum of preventive care. Copyright © 2013 Elsevier Inc. All rights reserved.

  7. Influence of the economy crisis on project cost management

    Science.gov (United States)

    Simankina, Tatyana; Ćetković, Jasmina; Verstina, Natalia; Evseev, Evgeny

    2017-10-01

    Economy crisis significantly affects primarily the project cost management. The article considers the problems of project management in the field of housing under conditions of economy crisis. Project budgets are reduced, their mutual interference grows and framework of risks changes. Apparently, specific approaches are required to be developed to optimize the expenses and guarantee the project implementation within the approved budget. There is considered domestic and foreign experience in terms of project cost management with involvement of BIM technologies.

  8. Multi-Model Projections of River Flood Risk in Europe under Global Warming

    Directory of Open Access Journals (Sweden)

    Lorenzo Alfieri

    2018-01-01

    Full Text Available Knowledge on the costs of natural disasters under climate change is key information for planning adaptation and mitigation strategies of future climate policies. Impact models for large scale flood risk assessment have made leaps forward in the past few years, thanks to the increased availability of high resolution climate projections and of information on local exposure and vulnerability to river floods. Yet, state-of-the-art flood impact models rely on a number of input data and techniques that can substantially influence their results. This work compares estimates of river flood risk in Europe from three recent case studies, assuming global warming scenarios of 1.5, 2, and 3 degrees Celsius from pre-industrial levels. The assessment is based on comparing ensemble projections of expected damage and population affected at country level. Differences and common points between the three cases are shown, to point out main sources of uncertainty, strengths, and limitations. In addition, the multi-model comparison helps identify regions with the largest agreement on specific changes in flood risk. Results show that global warming is linked to substantial increase in flood risk over most countries in Central and Western Europe at all warming levels. In Eastern Europe, the average change in flood risk is smaller and the multi-model agreement is poorer.

  9. PRA (Probabilistic Risk Assessments) Participation versus Validation

    Science.gov (United States)

    DeMott, Diana; Banke, Richard

    2013-01-01

    Probabilistic Risk Assessments (PRAs) are performed for projects or programs where the consequences of failure are highly undesirable. PRAs primarily address the level of risk those projects or programs posed during operations. PRAs are often developed after the design has been completed. Design and operational details used to develop models include approved and accepted design information regarding equipment, components, systems and failure data. This methodology basically validates the risk parameters of the project or system design. For high risk or high dollar projects, using PRA methodologies during the design process provides new opportunities to influence the design early in the project life cycle to identify, eliminate or mitigate potential risks. Identifying risk drivers before the design has been set allows the design engineers to understand the inherent risk of their current design and consider potential risk mitigation changes. This can become an iterative process where the PRA model can be used to determine if the mitigation technique is effective in reducing risk. This can result in more efficient and cost effective design changes. PRA methodology can be used to assess the risk of design alternatives and can demonstrate how major design changes or program modifications impact the overall program or project risk. PRA has been used for the last two decades to validate risk predictions and acceptability. Providing risk information which can positively influence final system and equipment design the PRA tool can also participate in design development, providing a safe and cost effective product.

  10. Risk Management Capability Maturity and Performance of Complex Product and System (CoPS Projects with an Asian Perspective

    Directory of Open Access Journals (Sweden)

    Ren, Y.

    2014-07-01

    Full Text Available Complex Products and Systems (CoPS are high value, technology and engineering-intensive capital goods. The motivation of this study is the persistent high failure rate of CoPS projects, Asian CoPS provider’s weak capability and lack of specific research on CoPS risk management. This paper evaluates risk management maturity level of CoPS projects against a general CoPS risk management capability maturity model (RM-CMM developed by the authors. An Asian based survey was conducted to investigate the value of RM to project performance, and Asian (non-Japanese CoPS implementers’ perceived application of RM practices, their strengths and weaknesses. The survey result shows that higher RM maturity level leads to higher CoPS project performance. It also shows project complexity and uncertainty moderates the relationship between some RM practices and project performance, which implies that a contingency approach should be adopted to manage CoPS risks effectively. In addition, it shows that Asian CoPS implementers are weak in RM process and there are also rooms for improvement in the softer aspects of organizational capabilities and robustness.

  11. Reducing Stress within the Rehabilitative Work Setting - A Report on the ROSE Project

    Science.gov (United States)

    Wells, John S. G.; Denny, Margaret

    Reducing Occupational Stress in Employment (ROSE) is an EU funded project which aims to develop a combined person and work directed stress management programme in order to improve the long-term retention of staff in the vocational rehabilitation sector for mental health and intellectual disabilities.

  12. The Swiss Virtual Campus Project NAHRIS: Experiences from a Multidisciplinary E-Learning Project in the Natural Hazard and Risk Management Domain

    Science.gov (United States)

    Lienert, Christophe; Bischof, Nicole; Hurni, Lorenz

    2009-01-01

    The overall goal of the Swiss Virtual Campus project Dealing with Natural Hazards and Risk (NAHRIS) is to create a common educational course program that compiles the most recent knowledge in the field of natural hazards and risk management. Several higher education institutes from all parts of Switzerland were involved in the realization of this…

  13. Designing an integrated model based on the indicators Quality and Earned Value for risk management in Information Technology Projects

    OpenAIRE

    TATLARI, Mohammad Reza; KAZEMİPOOR, Hamed

    2015-01-01

    There are two effective factors on Information Technology (IT) projects risk including quality and earned value so that by controlling these two factors and their increased level in IT projects, the corresponding risk can be decreased. Therefore in present study, an integrated model was designed based on quality and earned value indicators for risk management in IT projects on a new and efficient approach. The proposed algorithm included the steps such as preparing a list of several indicator...

  14. 城市轨道交通项目融资风险动态评价%The Dynamic Evaluation of Urban Rail Transit Project Financing Risk

    Institute of Scientific and Technical Information of China (English)

    刘维庆; 邓少波; 顼志芬

    2016-01-01

    项目融资在解决城市轨道交通建设中所需资金问题的同时也面临高风险,为减少和避免投资者的损失,应对城市轨道交通项目融资风险进行准确客观的评价.本文对城市轨道交通项目融资过程中各阶段的风险因素进行识别,基于可拓理论,建立城市轨道交通项目融资风险评价模型,通过关联度的计算结果确定风险等级,进而反映各阶段风险因素的动态变化.结合案例分析,提出相应的风险管理措施.%Project financing in solving urban rail transit development facing money problems at the same time also faces high risks,in order to reduce and avoid the loss of investors,we should make accurate and objective evaluation for the urban rail transit project financing risk.This paper based on extension theory,from the dynamic perspective of urban rail transit project financing risk establishes a dynamic evaluation model which considers all phases in the process of urban rail transit project financing risk factors,and reflect the status and influence degree of various kinds of risk factors.

  15. Projecting the risk of damage to reef-lined coasts due to intensified tropical cyclones and sea level rise in Palau to 2100

    OpenAIRE

    Hongo, Chuki; Kurihara, Haruko; Golbuu, Yimnang

    2017-01-01

    Tropical cyclones (TCs), sea level rise (SLR), and storm surges cause major problems including beach erosion, saltwater intrusion into groundwater, and damage to infrastructure in coastal areas. The magnitude and extent of damage is predicted to increase as a consequence of future climate change and local factors. Upward reef growth has attracted attention for its role as a natural breakwater able to reduce the risks of natural disasters to coastal communities. However, projections of change ...

  16. Meta-analyses on behavioral interventions to reduce the risk of transmission of HIV.

    Science.gov (United States)

    Vergidis, Paschalis I; Falagas, Matthew E

    2009-06-01

    Different behavioral interventions have found to be efficacious in reducing high-risk sexual activity. Interventions have been evaluated in both original research and meta-analytic reviews. Most of the studies have shown that interventions are efficacious among different study populations. In adolescents, both in- and out-of-the classroom interventions showed a decrease in the risk of unprotected sex. In African Americans, greater efficacy was found for interventions including peer education. For Latinos, effect was larger in interventions with segmentation in the same gender. Geographic and social isolation are barriers in approaching MSM. For IDUs, interventions provided within a treatment program have an impact on risk reduction above that produced by drug treatment alone. Finally, people diagnosed with HIV tend to reduce their sexual risk behavior. However, adherence to safe sex practices for life can be challenging. Relentless efforts for implementation of behavioral interventions to decrease high-risk behavior are necessary to decrease HIV transmission.

  17. Does risk management contribute to IT project success? A meta-analysis of empirical evidence

    NARCIS (Netherlands)

    de Bakker, K.F.C.; Boonstra, A.; Wortmann, J.C.

    The question whether risk management contributes to IT project success is considered relevant by people from both academic and practitioners' communities already for a long time. This paper presents a meta-analysis of the empirical evidence that either supports or opposes the claim that risk

  18. Reducing The Risk Of Fires In Conveyor Transport

    Science.gov (United States)

    Cheremushkina, M. S.; Poddubniy, D. A.

    2017-01-01

    The paper deals with the actual problem of increasing the safety of operation of belt conveyors in mines. Was developed the control algorithm that meets the technical requirements of the mine belt conveyors, reduces the risk of fires of conveyors belt, and enables energy and resource savings taking into account random sort of traffic. The most effective method of decision such tasks is the construction of control systems with the use of variable speed drives for asynchronous motors. Was designed the mathematical model of the system "variable speed multiengine drive - conveyor - control system of conveyors", that takes into account the dynamic processes occurring in the elements of the transport system, provides an assessment of the energy efficiency of application the developed algorithms, which allows to reduce the dynamic overload in the belt to (15-20)%.

  19. A systematic risk management approach employed on the CloudSat project

    Science.gov (United States)

    Basilio, R. R.; Plourde, K. S.; Lam, T.

    2000-01-01

    The CloudSat Project has developed a simplified approach for fault tree analysis and probabilistic risk assessment. A system-level fault tree has been constructed to identify credible fault scenarios and failure modes leading up to a potential failure to meet the nominal mission success criteria.

  20. Reducing the risk from radioactive sources

    International Nuclear Information System (INIS)

    MacKenzie, C.

    2006-01-01

    Each year the IAEA receives reports of serious injuries or deaths due to misuse or accidents involving sealed radioactive sources. Sealed radioactive sources are used widely in medicine, industry, and agriculture - by doctors to treat cancer, by radiographers to check welds in pipelines, or by specialists to irradiate food to prevent it from spoiling, for example. If these sources are lost or improperly discarded, a serious accident may result. In addition, the security of sealed sources has become a growing concern, particularly the potential that such a source could be used as a radioactive dispersal device or 'dirty bomb'. Preventing the loss or theft of sealed radioactive sources reduces both the risk of accidents and the risk that such sources could become an instrument of misuse. In most countries, radioactive materials and activities that produce radiation are regulated. Those working with sealed radioactive sources are required not just to have proper credentials, but also the needed training and support to deal with unexpected circumstances that may arise when a source is used. Despite these measures, accidents involving sealed sources continue to be reported to the IAEA. Among its many activities to improve the safety and security of sealed sources, the IAEA has been investigating the root causes of major accidents since the 1980s and publishing the findings so that others can learn from them. This information needs to be in the hands of those whose actions and decisions can reduce accidents by preventing a lost source from making it's way into scrap metal. The IAEA has also developed an international catalogue of sealed radioactive sources, and provides assistance to countries to safely contain sources no longer in use. To raise awareness, a Sealed Radioactive Sources Toolkit was issued that focuses on the long-term issues in safely and securely managing radioactive sealed sources. The target audiences are government agencies, radioactive sealed source

  1. EPA'S strategy to reduce risk of radon

    International Nuclear Information System (INIS)

    Page, S.

    1993-01-01

    The Indoor Radon Abatement Act of 1988 (IRAA) directed EPA to undertake a variety of activities to address the growing public concern over dangers posed by exposure to indoor radon. Among other requirements, the law directed the Agency to study radon levels, evaluate mitigation methods, establish proficiency programs, assist states with program development, develop training centers, and provide public information. EPA has developed and implemented programs to address each of the key provisions of this statute. This paper presents EPA's broad national strategy to reduce radon risks. It combines and reinforces EPA's basic foundation, including its guiding policies and cooperative partnerships, with an overall management approach and focus for the future. The paper starts with an overview that introduces the strategy's four key elements: underlying policies and scientific principles, a decentralized system of states and other partners for targeting the public, multiple strategies for achieving radon risk reduction, and a strong focus on five key program priorities. This paper then discusses each of these elements in more detail and describes how they interact to guide future efforts and directions of the Agency

  2. Methodologies for Improving Flight Project Information Capture, Storage, and Dissemination

    Science.gov (United States)

    Equils, Douglas J.

    2011-01-01

    This paper will discuss the drawbacks and risks of the current documentation paradigm, how Document QuickStart improves on that process and ultimately how this stream-lined approach will reduce risk and costs to the next generation of Flight Projects at JPL

  3. Perceptions of Risk of Developing Skin Cancer for Diverse Audiences: Enhancing Relevance of Sun Protection to Reduce the Risk.

    Science.gov (United States)

    Robinson, June K; Friedewald, John; Gordon, Elisa J

    2016-03-01

    Sixty-five percent of kidney transplant recipients (KTRs) develop squamous cell carcinoma (SCC). Perceptions of risk of developing skin cancer, amelioration of this risk with sun protection, and having choices among sun protection strategies may enhance sun protection use by KTRS, who are at greater risk than the general population. Thirty KTRs stratified among non-Hispanic Whites, non-Hispanic Blacks, and Hispanic/Latinos evaluated three versions of the interactive, web-based, electronic sun protection program and suggested refinements. The sequence of content presentation prepared the participant to accept the credibility, accuracy, and relevance of the message. Beginning with informing participants that using sun protection reduces the chance of developing skin cancer made the information credible to KTRs. Showing skin cancer on all skin types and patient testimonials enhanced participants' awareness of their susceptibility to develop skin cancer and primed patients to receive their personal risk of developing skin cancer. Coupling presentation of knowledge about the benefits of sun protection in reducing the risk of developing skin cancer with the personal risk of getting the disease was essential to KTRs believing that they could influence their health outcome.

  4. Risk management of energy efficiency projects in the industry - sample plant for injecting pulverized coal into the blast furnaces

    Directory of Open Access Journals (Sweden)

    Jovanović Filip P.

    2016-01-01

    Full Text Available This paper analyses the applicability of well-known risk management methodologies in energy efficiency projects in the industry. The possibilities of application of the selected risk management methodology are demonstrated within the project of the plants for injecting pulverized coal into blast furnaces nos. 1 and 2, implemented by the company US STEEL SERBIA d.o.o. in Smederevo. The aim of the project was to increase energy efficiency through the reduction of the quantity of coke, whose production requires large amounts of energy, reduction of harmful exhaust emission and increase productivity of blast furnaces through the reduction of production costs. The project was complex and had high costs, so that it was necessary to predict risk events and plan responses to identified risks at an early stage of implementation, in the course of the project design, in order to minimise losses and implement the project in accordance with the defined time and cost limitations. [Projekat Ministarstva nauke Republike Srbije, br. 179081: Researching contemporary tendencies of strategic management using specialized management disciplines in function of competitiveness of Serbian economy

  5. The interplay between gait, falls and cognition: can cognitive therapy reduce fall risk?

    Science.gov (United States)

    Segev-Jacubovski, Orit; Herman, Talia; Yogev-Seligmann, Galit; Mirelman, Anat; Giladi, Nir; Hausdorff, Jeffrey M

    2011-01-01

    In this article, we briefly summarize the incidence and significant consequences of falls among older adults, the insufficient effectiveness of commonly used multifactorial interventions and the evidence linking falls and cognitive function. Recent pharmacologic and nonpharmacologic studies that evaluated the effects of cognitive therapy on fall risk are reviewed. The results of this article illustrate the potential utility of multiple, diverse forms of cognitive therapy for reducing fall risk. The article also indicates that large-scale, randomized controlled trials are warranted and that additional research is needed to better understand the pathophysiologic mechanisms underlying the interplay between human mobility, fall risk and cognitive function. Nonetheless, we suggest that multimodality interventions that combine motor and cognitive therapy should, eventually, be incorporated into clinical practice to enable older adults and patients to move safer and with a reduced fall risk. PMID:21721921

  6. Hypotheses and fundamental study design characteristics for evaluating potential reduced-risk tobacco products. Part I: Heuristic.

    Science.gov (United States)

    Murrelle, Lenn; Coggins, Christopher R E; Gennings, Chris; Carchman, Richard A; Carter, Walter H; Davies, Bruce D; Krauss, Marc R; Lee, Peter N; Schleef, Raymond R; Zedler, Barbara K; Heidbreder, Christian

    2010-06-01

    The risk-reducing effect of a potential reduced-risk tobacco product (PRRP) can be investigated conceptually in a long-term, prospective study of disease risks among cigarette smokers who switch to a PRRP and in appropriate comparison groups. Our objective was to provide guidance for establishing the fundamental design characteristics of a study intended to (1) determine if switching to a PRRP reduces the risk of lung cancer (LC) compared with continued cigarette smoking, and (2) compare, using a non-inferiority approach, the reduction in LC risk among smokers who switched to a PRRP to the reduction in risk among smokers who quit smoking entirely. Using standard statistical methods applied to published data on LC incidence after smoking cessation, we show that the sample size and duration required for a study designed to evaluate the potential for LC risk reduction for an already marketed PRRP, compared with continued smoking, varies depending on the LC risk-reducing effectiveness of the PRRP, from a 5-year study with 8000-30,000 subjects to a 15-year study with <5000 to 10,000 subjects. To assess non-inferiority to quitting, the required sample size tends to be about 10 times greater, again depending on the effectiveness of the PRRP. (c) 2009 Elsevier Inc. All rights reserved.

  7. Implementing Brief Interventions in Health Care: Lessons Learned from the Swedish Risk Drinking Project

    Directory of Open Access Journals (Sweden)

    Per Nilsen

    2011-09-01

    Full Text Available The Risk Drinking Project was a national implementation endeavour in Sweden, carried out from 2004 to 2010, based on a government initiative to give alcohol issues a more prominent place in routine primary, child, maternity and occupational health care. The article describes and analyses the project. Critical factors that were important for the results are identified. The magnitude of the project contributed to its reach and impact in terms of providers’ awareness of the project goals and key messages. The timing of the project was appropriate. The increase in alcohol consumption in Sweden and diminished opportunities for primary prevention strategies since entry to the European Union in 1995 have led to increased expectations for health care providers to become more actively involved in alcohol prevention. This awareness provided favourable conditions for this project. A multifaceted approach was used in the project. Most educational courses were held in workshops and seminars to encourage learning-by-doing. Motivational interviewing was an integral aspect. The concept of risk drinking was promoted in all the activities. Subprojects were tailored to the specific conditions of each respective setting, building on the skills the providers already had to modify existing work practices. Nurses were afforded a key role in the project.

  8. Examination of in-service risk management at the level of the draft project for Cigeo

    International Nuclear Information System (INIS)

    2014-01-01

    This document reports the opinion of the IRSN on the issue of in-service risk management as it appears in the draft project of Cigeo. After having recalled the general context of the ASN request for this opinion, and presented the ANDRA file on in-service risk-management of the draft project for Cigeo, this report describes the underground installation and the different flows during the exploitation phase, and recalls the various evolutions of Cigeo general design from the 2009 file to the draft project. The next part reports the examination by the IRSN of the relevance of the in-service safety approach by the ANDRA. The next chapter reports the examination of the risk analysis made by the ANDRA on radioactive material dissemination, fire (protection measures, ventilation control, case of exothermal reactions), explosion, handling, co-activity, as well as ageing and maintenance of storage components, intervention in accidental and incidental situation and possibility of retrieval of waste packages

  9. Improving Flood Risk Maps as a Capacity Building Activity: Fostering Public Participation and Raising Flood Risk Awareness in the German Mulde Region (project RISK MAP)

    Science.gov (United States)

    Luther, J.; Meyer, V.; Kuhlicke, C.; Scheuer, S.; Unnerstall, H.

    2012-04-01

    The EU Floods Directive requires the establishment of flood risk maps for high risk areas in all EU Member States by 2013. However, if existing at all, the current practice of risk mapping still shows some deficits: Risk maps are often seen as an information tool rather than a communication tool. This means that e.g. important local knowledge is not incorporated and forms a contrast to the understanding of capacity building which calls for engaging individuals in the process of learning and adapting to change and for the establishment of a more interactive public administration that learns equally from its actions and from the feedback it receives. Furthermore, the contents of risk maps often do not match the requirements of the end users, so that risk maps are often designed and visualised in a way which cannot be easily understood by laypersons and/or which is not suitable for the respective needs of public authorities in risk and flood event management. The project RISK MAP aimed at improving flood risk maps as a means to foster public participation and raising flood risk awareness. For achieving this aim, RISK MAP (1) developed rules for appropriate stakeholder participation enabling the incorporation of local knowledge and preferences; (2) improved the content of risk maps by considering different risk criteria through the use of a deliberative multicriteria risk mapping tool; and (3) improved the visualisation of risk maps in order to produce user-friendly risk maps by applying the experimental graphic semiology (EGS) method that uses the eye tracking approach. The research was carried out in five European case studies where the status quo of risk mapping and the legal framework was analysed, several stakeholder interviews and workshops were conducted, the visual perception of risk maps was tested and - based on this empirical work - exemplary improved risk maps were produced. The presentation and paper will outline the main findings of the project which

  10. Methodologies used in Project Management

    OpenAIRE

    UNGUREANU, Adrian; UNGUREANU, Anca

    2014-01-01

    Undoubtedly, a methodology properly defined and strictly followed for project management provides a firm guarantee that the work will be done on time, in budget and according to specifications. A project management methodology in simple terms is a “must-have” to avoid failure and reduce risks, because is one of the critical success factors, such basic skills of the management team. This is the simple way to guide the team through the design and execution phases, processes and tasks throughout...

  11. HSE risks assessment in urban high-rise construction using Fuzzy Approach

    Directory of Open Access Journals (Sweden)

    A. Ardeshir

    2015-07-01

    Conclusion: Findings in this research indicated that HSE risks are very critical and they should be controlled before start of the project. Moreover, many of HSE risk are due to lack of appropriate HSE culture in the organization and projects that can be reduced by culture-building practices.

  12. Psychosocial factors and uptake of risk-reducing salpingo-oophorectomy in women at high risk for ovarian cancer.

    Science.gov (United States)

    Meiser, Bettina; Price, Melanie A; Butow, Phyllis N; Karatas, Janan; Wilson, Judy; Heiniger, Louise; Baylock, Brandi; Charles, Margaret; McLachlan, Sue-Anne; Phillips, Kelly-Anne

    2013-03-01

    Bilateral risk-reducing salpingo-oophorectomy (RRSO) has been shown to significantly reduce the risk of ovarian cancer. This study assessed factors predicting uptake of RRSO. Women participating in a large multiple-case breast cancer family cohort study who were at increased risk for ovarian and fallopian tube cancer (i.e. BRCA1 or BRCA2 mutation carrier or family history including at least one first- or second-degree relative with ovarian or fallopian tube cancer), with no personal history of cancer and with at least one ovary in situ at cohort enrolment, were eligible for this study. Women who knew they did not carry the BRCA1 or BRCA2 mutation segregating in their family (true negatives) were excluded. Sociodemographic, biological and psychosocial factors, including cancer-specific anxiety, perceived ovarian cancer risk, optimism and social support, were assessed using self-administered questionnaires and interviews at cohort enrolment. RRSO uptake was self-reported every three years during systematic follow-up. Of 2,859 women, 571 were eligible. Mean age was 43.3 years; 62 women (10.9 %) had RRSO a median of two years after cohort entry. Factors predicting RRSO were: being parous (OR 3.3, p = 0.015); knowing one's mutation positive status (OR 2.9, p cancer (OR 2.5, p = 0.013). Psychological variables measured at cohort entry were not associated with RRSO. These results suggest that women at high risk for ovarian cancer make decisions about RRSO based on risk and individual socio-demographic characteristics, rather than in response to psychological factors such as anxiety.

  13. Fuel related risks; Braenslerisker

    Energy Technology Data Exchange (ETDEWEB)

    Englund, Jessica; Sernhed, Kerstin; Nystroem, Olle; Graveus, Frank (Grontmij AB, (Sweden))

    2012-02-15

    The project, within which this work report was prepared, aimed to complement the Vaermeforsk publication 'Handbook of fuels' on fuel related risks and measures to reduce the risks. The fuels examined in this project where the fuels included in the first version of the handbook from 2005 plus four additional fuels that will be included in the second and next edition of the handbook. Following fuels were included: woodfuels (sawdust, wood chips, powder, briquettes), slash, recycled wood, salix, bark, hardwood, stumps, straw, reed canary grass, hemp, cereal, cereal waste, olive waste, cocoa beans, citrus waste, shea, sludge, forest industrial sludge, manure, Paper Wood Plastic, tyre, leather waste, cardboard rejects, meat and bone meal, liquid animal and vegetable wastes, tall oil pitch, peat, residues from food industry, biomal (including slaughterhouse waste) and lignin. The report includes two main chapters; a general risk chapter and a chapter of fuel specific risks. The first one deals with the general concept of risk, it highlights laws and rules relevant for risk management and it discuss general risks that are related to the different steps of fuel handling, i.e. unloading, storing, processing the fuel, transportation within the facility, combustion and handling of ashes. The information that was used to produce this chapter was gathered through a literature review, site visits, and the project group's experience from risk management. The other main chapter deals with fuel-specific risks and the measures to reduce the risks for the steps of unloading, storing, processing the fuel, internal transportation, combustion and handling of the ashes. Risks and measures were considered for all the biofuels included in the second version in the handbook of fuels. Information about the risks and risk management was gathered through interviews with people working with different kinds of fuels in electricity and heat plants in Sweden. The information from

  14. Managing Programmatic Risk for Complex Space System Developments

    Science.gov (United States)

    Panetta, Peter V.; Hastings, Daniel; Brumfield, Mark (Technical Monitor)

    2001-01-01

    Risk management strategies have become a recent important research topic to many aerospace organizations as they prepare to develop the revolutionary complex space systems of the future. Future multi-disciplinary complex space systems will make it absolutely essential for organizations to practice a rigorous, comprehensive risk management process, emphasizing thorough systems engineering principles to succeed. Project managers must possess strong leadership skills to direct high quality, cross-disciplinary teams for successfully developing revolutionary space systems that are ever increasing in complexity. Proactive efforts to reduce or eliminate risk throughout a project's lifecycle ideally must be practiced by all technical members in the organization. This paper discusses some of the risk management perspectives that were collected from senior managers and project managers of aerospace and aeronautical organizations by the use of interviews and surveys. Some of the programmatic risks which drive the success or failure of projects are revealed. Key findings lead to a number of insights for organizations to consider for proactively approaching the risks which face current and future complex space systems projects.

  15. Small and low head pumped storage projects

    International Nuclear Information System (INIS)

    Makarechian, A.H.

    1991-01-01

    The purpose of this paper is to focus attention on small and low head pumped storage projects. These projects may be defined as having a capacity of less than 200-300 MW and down to about 20 MW, with heads of 1200 ft to about 300 ft or less. Many advantages of these smaller pumped storage projects include more flexibility in siting of a project, considerably shorter licensing and construction period, adaptability to closed system design concept to reduce adverse environmental impacts, considerably reduced risks of delays and substantial cost over-runs, better suited to meeting peaking capacity requirements for individual utilities, and much less transmission inter-connection requirements. An overall licensing and construction schedule of about 3 to 3 1/2 years is realistic for many smaller pumped storage projects, and competitive costs in terms of dollars per kW installed can be achieved

  16. From field studies to risk management: the Sensib project

    International Nuclear Information System (INIS)

    Mercat-Rommens, C.; Renaud, P.

    2004-01-01

    The consequences for the man and the environment of the discharges of nuclear facilities depend on the importance and the nature of the discharges, but also on the environment which receives them. Thus, the impact of a pollution, which is expressed in term of toxicity, risk or economic consequences, varies according to the characteristics of the environment and the use of this environment by the man. The radioecological sensitivity can be defined as the response of the environment to a radioactive pollution. This response is expressed through various indicators: the activity of a radionuclide at a precise moment, a stock of radionuclide in a given environmental compartment or a flux of radionuclide... For a determined discharge, the higher is the response, the more sensitive is the environment. If all the ecosystems appear sensitive, their sensitivity does not concern the same criteria and it is currently difficult to compare these criteria between them; is it more hazardous to have a stock of radioactivity present in a natural space or to have an important but time-limited concentration of radionuclides in a river used for irrigation? The idea of the SENSIB project is to create a standardized tool which makes it possible to represent and to compare with the same scale the sensitivity of various ecosystems. The sensitivity indexes, which will be developed during the project, aim to represent the intensity of the environmental response. These indicators, which are the result of the transfer of the radionuclides in the environment, depend on various intrinsic parameters of the ecosystems (climate, soil, agricultural practises...). The SENSIB project, based on results of field studies conducted by IRSN, aims to develop both a methodology to calculate sensitivity indexes and a radioecological sensitivity scale usable for risk management. (author)

  17. 房地产项目融资风险评价分析%Analysis of Real Estate Project Financing Risk Evaluation

    Institute of Scientific and Technical Information of China (English)

    王军; 杨光

    2016-01-01

    good interpretation and analysis of the financing risk of real estate project.As the real estate project selection,it was an important basis of financing scheme to reduce unnecessary loss for the real estate project financing.

  18. Probability-of-success studies for geothermal projects: from subsurface data to geological risk analysis

    Science.gov (United States)

    Schumacher, Sandra; Pierau, Roberto; Wirth, Wolfgang

    2017-04-01

    In recent years, the development of geothermal plants in Germany has increased significantly due to a favorable political setting and resulting financial incentives. However, most projects are developed by local communities or private investors, which cannot afford a project to fail. To cover the risk of total loss if the geothermal well should not provide the energy output necessary for an economically viable project, investors try to procure insurances for this worst case scenario. In order to issue such insurances, the insurance companies insist on so called probability-of-success studies (POS studies), in which the geological risk for not achieving the necessary temperatures and/or flow rates for an economically successful project is quantified. Quantifying the probability of reaching a minimum temperature, which has to be defined by the project investors, is relatively straight forward as subsurface temperatures in Germany are comparatively well known due tens of thousands of hydrocarbon wells. Moreover, for the German Molasse Basin a method to characterize the hydraulic potential of a site based on pump test analysis has been developed and refined in recent years. However, to quantify the probability of reaching a given flow rate with a given drawdown is much more challenging in areas where pump test data are generally not available (e.g. the North German Basin). Therefore, a new method based on log and core derived porosity and permeability data was developed to quantify the geological risk of reaching a determined flow rate in such areas. We present both methods for POS studies and show how subsurface data such as pump tests or log and core measurements can be used to predict the chances of a potential geothermal project from a geological point of view.

  19. Update on raloxifene: role in reducing the risk of invasive breast cancer in postmenopausal women

    Directory of Open Access Journals (Sweden)

    Vogel VG

    2011-10-01

    Full Text Available Victor G Vogel Cancer Institute, Geisinger Health System, Danville, PA, USA Abstract: Risk factors allow us to define women who are at increased lifetime risk for breast cancer, and the most important factor is age. Benign breast disease increases risk, and the most important histologies are atypical lobular or ductal hyperplasia and lobular carcinoma in situ. Family history of breast cancer among first-degree relatives (mother, sisters, daughters also increases risk. Quantitative measures of risk give accurate predictions of breast cancer incidence for groups of women but not for individual subjects. Multiple published, randomized controlled trials, which employed selective estrogen receptor (ER modulators (SERMs, have demonstrated consistent reductions of 35% or greater in the risk of ER-positive invasive and noninvasive breast cancer in postmenopausal women. Professional organizations in the US now recommend the use of SERMs to reduce the risk of breast cancer in high-risk, postmenopausal women. Raloxifene and tamoxifen reduce the risk of ER-positive invasive breast cancer with equal efficacy, but raloxifene is associated with a lower risk of thromboembolic disease, benign uterine conditions, and cataracts than tamoxifen in postmenopausal women. No evidence exists establishing whether a reduction in breast cancer risk from either agent translates into reduced breast cancer mortality. Overall quality of life is similar with raloxifene or tamoxifen, but the incidence of dyspareunia, weight gain, and musculoskeletal complaints is higher with raloxifene use, whereas vasomotor symptoms, bladder incontinence, gynecologic symptoms, and leg cramps were higher with tamoxifen use. Keywords: selective estrogen receptor modulators (SERMs, raloxifene, risk reduction, chemoprevention

  20. Overview of Graphical User Interface for ARRBOD (Acute Radiation Risk and BRYNTRN Organ Dose Projection)

    Science.gov (United States)

    Kim, Myung-Hee Y.; Hu, Shaowen; Nounu, Hatem N.; Cucinotta, Francis A.

    2010-01-01

    Solar particle events (SPEs) pose the risk of acute radiation sickness (ARS) to astronauts, because organ doses from large SPEs may reach critical levels during extra vehicular activities (EVAs) or lightly shielded spacecraft. NASA has developed an organ dose projection model of Baryon transport code (BRYNTRN) with an output data processing module of SUMDOSE, and a probabilistic model of acute radiation risk (ARR). BRYNTRN code operation requires extensive input preparation, and the risk projection models of organ doses and ARR take the output from BRYNTRN as an input to their calculations. With a graphical user interface (GUI) to handle input and output for BRYNTRN, these response models can be connected easily and correctly to BRYNTRN in a user friendly way. The GUI for the Acute Radiation Risk and BRYNTRN Organ Dose (ARRBOD) projection code provides seamless integration of input and output manipulations required for operations of the ARRBOD modules: BRYNTRN, SUMDOSE, and the ARR probabilistic response model. The ARRBOD GUI is intended for mission planners, radiation shield designers, space operations in the mission operations directorate (MOD), and space biophysics researchers. Assessment of astronauts organ doses and ARS from the exposure to historically large SPEs is in support of mission design and operation planning to avoid ARS and stay within the current NASA short-term dose limits. The ARRBOD GUI will serve as a proof-of-concept for future integration of other risk projection models for human space applications. We present an overview of the ARRBOD GUI product, which is a new self-contained product, for the major components of the overall system, subsystem interconnections, and external interfaces.

  1. The HEART score is useful to predict cardiovascular risks and reduces unnecessary cardiac imaging in low-risk patients with acute chest pain.

    Science.gov (United States)

    Dai, Siping; Huang, Bo; Zou, Yunliang; Guo, Jianbin; Liu, Ziyong; Pi, Dangyu; Qiu, Yunhong; Xiao, Chun

    2018-06-01

    The present study was to investigate whether the HEART score can be used to evaluate cardiovascular risks and reduce unnecessary cardiac imaging in China.Acute coronary syndrome patients with the thrombosis in myocardial infarction risk score risk HEART score group and 2 patients (1.5%) in the high risk HEART score group had cardiovascular events. The sensitivity of HEART score to predict cardiovascular events was 100% and the specificity was 46.7%. The potential unnecessary cardiac testing was 46.3%. Cox proportional hazards regression analysis showed that per one category increase of the HEART score was associated with nearly 1.3-fold risk of cardiovascular events.In the low-risk acute chest pain patients, the HEART score is useful to physicians in evaluating the risk of cardiovascular events within the first 30 days. In addition, the HEART score is also useful in reducing the unnecessary cardiac imaging.

  2. Identifying Critical Nutrient Intake in Groups at Risk of Poverty in Europe: The CHANCE Project Approach

    Science.gov (United States)

    Nikolić, Marina; Glibetić, Maria; Gurinović, Mirjana; Milešević, Jelena; Khokhar, Santosh; Chillo, Stefania; Abaravicius, Jonas Algis; Bordoni, Alessandra; Capozzi, Francesco

    2014-01-01

    The aim of the CHANCE project is to develop novel and affordable nutritious foods to optimize the diet and reduce the risk of diet-related diseases among groups at risk of poverty (ROP). This paper describes the methodology used in the two initial steps to accomplish the project’s objective as follows: 1. a literature review of existing data and 2. an identification of ROP groups with which to design and perform the CHANCE nutritional survey, which will supply new data that is useful for formulating the new CHANCE food. Based on the literature review, a low intake of fruit and vegetables, whole grain products, fish, energy, fiber, vitamins B1, B2, B3, B6, B12 and C, folate, calcium, magnesium, iron, potassium and zinc and a high intake of starchy foods, processed meat and sodium were apparent. However, the available data appeared fragmented because of the different methodologies used in the studies. A more global vision of the main nutritional problems that are present among low-income people in Europe is needed, and the first step to achieve this goal is the use of common criteria to define the risk of poverty. The scoring system described here represents novel criteria for defining at-risk-of-poverty groups not only in the CHANCE-participating countries but also all over Europe. PMID:24699195

  3. Identifying Critical Nutrient Intake in Groups at Risk of Poverty in Europe: The CHANCE Project Approach

    Directory of Open Access Journals (Sweden)

    Marina Nikolić

    2014-04-01

    Full Text Available The aim of the CHANCE project is to develop novel and affordable nutritious foods to optimize the diet and reduce the risk of diet-related diseases among groups at risk of poverty (ROP. This paper describes the methodology used in the two initial steps to accomplish the project’s objective as follows: 1. a literature review of existing data and 2. an identification of ROP groups with which to design and perform the CHANCE nutritional survey, which will supply new data that is useful for formulating the new CHANCE food. Based on the literature review, a low intake of fruit and vegetables, whole grain products, fish, energy, fiber, vitamins B1, B2, B3, B6, B12 and C, folate, calcium, magnesium, iron, potassium and zinc and a high intake of starchy foods, processed meat and sodium were apparent. However, the available data appeared fragmented because of the different methodologies used in the studies. A more global vision of the main nutritional problems that are present among low-income people in Europe is needed, and the first step to achieve this goal is the use of common criteria to define the risk of poverty. The scoring system described here represents novel criteria for defining at-risk-of-poverty groups not only in the CHANCE-participating countries but also all over Europe.

  4. Immediate Antiretroviral Therapy Reduces Risk of Infection-Related Cancer During Early HIV Infection

    DEFF Research Database (Denmark)

    Borges, Alvaro Humberto Diniz; Neuhaus, Jacqueline; Babiker, Abdel G

    2016-01-01

    BACKGROUND:  In the Strategic Timing of Antiretroviral Treatment (START) study, immediate combination antiretroviral therapy (cART) initiation reduced cancer risk by 64%. We hypothesized that risk reduction was higher for infection-related cancer and determined by differences in CD4 cell counts a...

  5. Project management plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory. Environmental Restoration Program

    International Nuclear Information System (INIS)

    1995-01-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place nineteen former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S ampersand M) and as quickly and economically as possible. Implementation and completion of the deactivation project win further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S ampersand M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project

  6. A conceptual framework for the evaluation of cost-effectiveness of projects to reduce GHG emissions and sequester carbon

    International Nuclear Information System (INIS)

    Sathaye, J.; Norgaard, R.; Makundi, W.

    1993-07-01

    This paper proposes a conceptual framework for evaluating the cost of projects to reduce atmospheric greenhouse gases (GHGs). The evaluation of cost-effectiveness should account for both the timing of carbon emissions and the damage caused by the atmospheric stock of carbon. We develop a conceptual basis to estimate the cost-effectiveness of projects in terms of the cost of reducing atmospheric carbon (CRAC) and other GHGs. CRAC accounts for the economic discount rate, alternative functional forms of the shadow price, the residence period of carbon in the atmosphere, and the multiple monetary benefits of projects. The last item is of particular importance to the developing countries

  7. Risk-reducing salpingectomy with delayed oophorectomy in BRCA1/2 mutation carriers: Patients' and professionals' perspectives

    NARCIS (Netherlands)

    Jong, M. de; Harmsen, M.G.; Hoogerbrugge, N.; Massuger, L.F.A.G.; Hermens, R.P.M.G.; Hullu, J.A. de

    2015-01-01

    OBJECTIVE: To identify influencing factors of BRCA1/2 mutation carriers and their professionals for risk-reducing salpingectomy (RRS) with delayed oophorectomy (RRO) as a substitute for risk-reducing salpingo-oophorectomy (RRSO) and for study participation on this concept. METHODS: A qualitative

  8. Evaluating the Investment Benefit of Multinational Enterprises' International Projects Based on Risk Adjustment: Evidence from China

    Science.gov (United States)

    Chen, Chong

    2016-01-01

    This study examines the international risks faced by multinational enterprises to understand their impact on the evaluation of investment projects. Moreover, it establishes a 'three-dimensional' theoretical framework of risk identification to analyse the composition of international risk indicators of multinational enterprises based on the theory…

  9. Risk control in energy saving projects; Control de riesgo en los proyectos de ahorro de energia

    Energy Technology Data Exchange (ETDEWEB)

    Mills, Evan [Lawrence Berkeley National Laboratory, CA (United States)

    2005-10-15

    Since one of the restrictive problems when investing in energy saving is the uncertainty of obtaining the planed savings, a technique in the risk handling for energy efficiency projects, called Insurance for the Energy Saving (IES) is presented. IES economically stimulates those who implement projects for energy saving so they go beyond the normal measures and really obtain significant saving levels, thus contributing to the fulfillment of national objectives in energy saving. In order to reduce the risk of low performance in energy caused by saving projects there exist the international performance measurement and the protocol of investment (IMPVP) as well as diagnoses and starting processes, whereas in order to transfer the financial risk that a saving project represents, mechanisms such as FDIC insurance, conversion of the debt in values, Saving's Guarantees, Performance Bonuses or Guarantee Bonuses and Insurances for Energy Saving can be of great help. This article deals on the IES insurance policies, their loss control management, successful cases, benefits, particular advantages, place in the market and refers argued insurance exceptions and perception surveys. [Spanish] Dado que uno de los problemas restrictivos a la hora de invertir en el ahorro de energia es la incertidumbre de obtener los ahorros proyectados, se presenta una tecnica en el manejo del riesgo para proyectos de eficiencia energetica llamada Seguro para el Ahorro de Energia (SAE). SAE estimula financieramente a quienes implementan proyectos para el ahorro de energia con el fin de que vayan mas alla de las medidas normales y consigan niveles significativos de ahorro, contribuyendo asi al cumplimiento de objetivos nacionales de ahorro energetico. Para reducir el riesgo de bajo desempeno de energia provocados por proyectos de ahorro existe la medicion del desempeno internacional y el protocolo de inversion (IMPVP) asi como diagnosticos y procesos de arranque, mientras que para transferir el

  10. Projected global health impacts from severe nuclear accidents: Conversion of projected doses to risks on a global scale: Experience from Chernobyl releases

    International Nuclear Information System (INIS)

    Catlin, R.J.; Goldman, M.; Anspaugh, L.R.

    1988-01-01

    Estimates of projected collective dose and average individual dose commitments from Chernobyl releases were made for various regions. Consideration was given to the possible effectiveness of protective actions taken by various countries to reduce projected doses to their populations. Although some preliminary data indicate possible mean reductions of about 25% in total collective doses over the first year, and of about 55% in collective dose to the thyroid, no corrections were made to these dose estimates because of the variable nature of the data. A new combined set of dose-effect models recently published by the United States Nuclear Regulatory Commission was then applied to estimate the ranges of possible future additional health effects due to the Chernobyl accident. In this method possible health effects are estimated on an individual site basis and the results are then summed. Both absolute and relative risk projection models are used. By use of these methods, ''best'' estimates of possible additional health effects were projected for the Northern Hemisphere as follows: 1) over the next 50 years, up to 28 thousand radiation-induced fatal cancers, compared to an expected 600 million cancer deaths from natural or spontaneous causes; 2) over the next year, up to 700 additional cases of severe mental retardation, compared to a normal expectation of 340 thousand cases; and 3) in the first generation, up to 1.9 thousand radiation-induced genetic disorders, compared to 180 million naturally-occurring cases. The possibility of zero health effects at very low doses and dose rates cannot be excluded. Owing to the very large numbers of naturally-occurring health effects, it is unlikely that any additional health effects will be demonstrable except, perhaps, for the more highly exposed population in the immediate vicinity of Chernobyl. 13 refs, 4 figs, 6 tabs

  11. Decision making and risk analysis during the development of wind energy projects

    International Nuclear Information System (INIS)

    Vanhaesebroeck, M.

    2004-11-01

    This study aims at determining a methodology or criteria which can be used as decision making tools for the development of wind power projects and for the objective profitability comparison between several projects. In the first part, the different steps of the development of a wind power project in France are described. For each step, the cost of the studies, the related approaches and the main risks of abandonment are precised. The potential time drifts in the planning of the project are identified on the basis of the experience feedback of the first years of wind power development in France. In the second part, the possibilities of using classical investment choice techniques are analyzed. The characteristics having more impact on the project profitability are identified. In the third part, the sequential models with increasing information are used to evaluate a project, whatever its level of development. Finally, a concrete case is considered to see how these models can be used as decision making tools during key steps of wind farms development. (J.S.)

  12. How to manage project opportunity and risk why uncertainty management can be a much better approach than risk management

    CERN Document Server

    Ward, Stephen

    2011-01-01

    Since I wrote the Foreword for the second edition of this book, risk management processes have become much more widely used, but controversy about what should be done and how best to do it has grown. Managing risk is a risky business. Chapman and Ward provide an in-depth explanation of why it is important to understand and manage underlying uncertainty in all its forms, in order to realise opportunities more fully and enhance corporate performance. They show what best practice should look like. The implications go well beyond the conventional wisdom of project risk management, providing an enl

  13. Relacionamento entre gerenciamento de risco e sucesso de projetos Relationship between risk management and project success

    Directory of Open Access Journals (Sweden)

    Roque Rabechini Junior

    2012-01-01

    Full Text Available Este trabalho apresenta os resultados de uma pesquisa feita em quatro estados brasileiros sobre adoção de práticas de gerenciamento de riscos em projetos com diferentes tipos de complexidade. A pesquisa de campo envolveu 415 projetos de nove setores econômicos distintos. O material obtido foi coletado por meio de questionário aplicado em gerentes e membros de equipe de projetos. Os resultados mostraram que há impacto significativo e positivo da adoção de práticas de gerenciamento de riscos no sucesso dos projetos. Mostrou também que há dependência entre percepção de sucesso e presença/ausência de gerente de risco, havendo impacto positivo da presença do gerente de risco no sucesso dos projetos. As principais limitações da pesquisa concernem às escolhas metodológicas de amostra não probabilística, empregando questionário baseado na percepção dos respondentes. O trabalho originalmente integra a visão de práticas de gerenciamento de riscos com resultados em projetos, servindo de base para novos estudos em outros setores e áreas de conhecimento de projetos.This paper presents the results of an investigation in four Brazilian States on the adoption of Risk Management practices in projects with different complexity levels. The field research involved 415 projects from nine different economic sectors. Data was gathered through a questionnaire applied to managers and project team members. Results showed that there are significant and positive impacts in the adoption of Risk Management practices on project success. It also showed that there is dependence between perceived success and the presence/absence of a risk manager, i.e., the presence of a risk manager has positive impacts on project success. The major limitation of this study concerns the methodological choice: non-probability sample survey based on respondents perception. The work promotes the integration between Risk Management practices and projects performance

  14. Reducing Spread in Climate Model Projections of a September Ice-Free Arctic

    Science.gov (United States)

    Liu, Jiping; Song, Mirong; Horton, Radley M.; Hu, Yongyun

    2013-01-01

    This paper addresses the specter of a September ice-free Arctic in the 21st century using newly available simulations from the Coupled Model Intercomparison Project Phase 5 (CMIP5). We find that large spread in the projected timing of the September ice-free Arctic in 30 CMIP5 models is associated at least as much with different atmospheric model components as with initial conditions. Here we reduce the spread in the timing of an ice-free state using two different approaches for the 30 CMIP5 models: (i) model selection based on the ability to reproduce the observed sea ice climatology and variability since 1979 and (ii) constrained estimation based on the strong and persistent relationship between present and future sea ice conditions. Results from the two approaches show good agreement. Under a high-emission scenario both approaches project that September ice extent will drop to approx. 1.7 million sq km in the mid 2040s and reach the ice-free state (defined as 1 million sq km) in 2054-2058. Under a medium-mitigation scenario, both approaches project a decrease to approx.1.7 million sq km in the early 2060s, followed by a leveling off in the ice extent.

  15. Breastfeeding reduces the risk of obesity in childhood and adolescence

    Directory of Open Access Journals (Sweden)

    Eleni-Maria Papatesta

    2013-06-01

    Full Text Available Childhood obesity has increased dramatically over the last decades, representing one of the most serious public health hazards of the 21st century. Efforts must be made by healthcare professionals to prevent it, as it is associated with short- and long-term risks for physical and mental health and because of the increased possibility to persist during adulthood. From antiquity human breast milk was considered the ideal nourishment for the newborn. Breastfeeding is beneficial for the mother-child dyad. Among others, existing data suggest that it reduces the risk for childhood and adolescence obesity. The mechanisms for this are numerous and include the feeding behavior breastfeeding infants acquire, their growth rate, the ‘early protein hypothesis’, the role of leptin that is found in increased levels in human milk, the dietary choices the breastfed infants make during childhood and adolescence and finally the differences in their bowel flora. Meta-analyses provide sufficient evidence for this protective effect, with a dose-response effect as to the duration of breastfeeding. Healthcare professionals involved in the care of the mother-infant dyad must encourage and support mothers to breastfeed their infants for a long period of time, if obesity were to be prevented. Aim of this review is to provide an account of existing data on the association of breastfeeding and the reduced risk of obesity in childhood and adulthood.

  16. A preliminary approach to quantifying the overall environmental risks posed by development projects during environmental impact assessment.

    Science.gov (United States)

    Nicol, Sam; Chadès, Iadine

    2017-01-01

    Environmental impact assessment (EIA) is used globally to manage the impacts of development projects on the environment, so there is an imperative to demonstrate that it can effectively identify risky projects. However, despite the widespread use of quantitative predictive risk models in areas such as toxicology, ecosystem modelling and water quality, the use of predictive risk tools to assess the overall expected environmental impacts of major construction and development proposals is comparatively rare. A risk-based approach has many potential advantages, including improved prediction and attribution of cause and effect; sensitivity analysis; continual learning; and optimal resource allocation. In this paper we investigate the feasibility of using a Bayesian belief network (BBN) to quantify the likelihood and consequence of non-compliance of new projects based on the occurrence probabilities of a set of expert-defined features. The BBN incorporates expert knowledge and continually improves its predictions based on new data as it is collected. We use simulation to explore the trade-off between the number of data points and the prediction accuracy of the BBN, and find that the BBN could predict risk with 90% accuracy using approximately 1000 data points. Although a further pilot test with real project data is required, our results suggest that a BBN is a promising method to monitor overall risks posed by development within an existing EIA process given a modest investment in data collection.

  17. Context dependency and consumer acceptance of risk reducing strategies - a choice experiment study on salmonella risks in pork

    DEFF Research Database (Denmark)

    Mørkbak, Morten Raun; Christensen, Tove; Gyrd-Hansen, Dorte

    2012-01-01

    The paper investigates to what extent context dependency is present, when consumers are introduced to different risk reducing technologies and how this will affect their preferences for reductions in food risks. In particular, choice experiments are used to elicit consumer preferences for reducin...... findings of bad news having greater effect than good news – now applied to context dependency of preferences for food safety technologies....

  18. Reducing Youth Risk Behaviors Through Interactive Theater Intervention

    Directory of Open Access Journals (Sweden)

    Ryan J. Watson

    2016-02-01

    Full Text Available The reduction of risk behaviors in secondary schools is a key concern for parents, teachers, and school administrators. School is one of the primary contexts of socialization for young people; thus, the investment in school-based programs to reduce risk behaviors is essential. In this study, we report on youth who participated in an intervention designed to improve decision-making skills based on positive youth development approaches. We examine changes in decision-making skills before and after involvement in the Teen Interactive Theater Education (TITE program and retrospective self-assessment of change in knowledge, abilities, and beliefs as a result of participating in TITE (n = 127. Youth that reported increases in knowledge, abilities, and beliefs due to the intervention (n = 89 were more likely to think about the consequences of their decisions and list options before making a decision compared to their counterparts that reported less overall learning (n = 38. Implications for intervention research and stakeholders are discussed.

  19. Workplace Interventions to Reduce Obesity and Cardiometabolic Risk.

    Science.gov (United States)

    Thorndike, Anne N

    2011-02-01

    The worksite is ideal for implementing interventions to reduce obesity and cardiometabolic risk factors. Although worksite health promotion is not new, employer-sponsored wellness programs have become more widespread due to the rising prevalence and high cost of obesity. Over the past two decades, employers and researchers focused efforts on individual-based programs to change employees' nutrition and exercise behaviors, but more recently, the worksite environment has been targeted. Overall, there is good evidence that individual-based worksite programs can produce modest weight loss, but the evidence for effects on other risk factors and on long-term health outcomes and costs is inconsistent. There is less evidence for the benefit of environmental-based interventions, and more data will be needed to establish conclusions about the benefits of these types of interventions. A major challenge for employers and researchers in the future will be to find the balance between effectiveness and economic viability of worksite wellness programs.

  20. Managing water, fish and power : trends in environmental regulation of hydropower projects

    Energy Technology Data Exchange (ETDEWEB)

    Bursey, D.; McLean, J.; Longe, R. [Bull, Housser and Tupper LLP, Vancouver, BC (Canada)

    2009-07-01

    Recent trends in federal legislation related to the environmental impacts of hydroelectric power projects were reviewed. The study focused on a discussion of recent and proposed amendments to the Species at Risk Act, the Fisheries Act, and the Navigable Waters Protection Act. Challenges associated with risk management, the public perception of risk, and the communication of decisions related to the management and protection of aquatic ecosystems were discussed. The Brilliant Expansion Power Project (BRX) examined the interactions with white sturgeon on the Kootenay River in British Columbia (BC). A monitoring program was conducted during the project's construction in order to reduce the risk to sturgeon from blasting. A habitat enhancement feature was also constructed. It was concluded that the mitigation strategies used during the BRX project provide a useful example of innovation and adaptive management. 19 refs.