WorldWideScience

Sample records for project project description

  1. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  2. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  3. Project description and crowdfunding success: an exploratory study.

    Science.gov (United States)

    Zhou, Mi Jamie; Lu, Baozhou; Fan, Weiguo Patrick; Wang, G Alan

    2018-01-01

    Existing research on antecedent of funding success mainly focuses on basic project properties such as funding goal, duration, and project category. In this study, we view the process by which project owners raise funds from backers as a persuasion process through project descriptions. Guided by the unimodel theory of persuasion, this study identifies three exemplary antecedents (length, readability, and tone) from the content of project descriptions and two antecedents (past experience and past expertise) from the trustworthy cue of project descriptions. We then investigate their impacts on funding success. Using data collected from Kickstarter, a popular crowdfunding platform, we find that these antecedents are significantly associated with funding success. Empirical results show that the proposed model that incorporated these antecedents can achieve an accuracy of 73 % (70 % in F-measure). The result represents an improvement of roughly 14 percentage points over the baseline model based on informed guessing and 4 percentage points improvement over the mainstream model based on basic project properties (or 44 % improvement of mainstream's performance over informed guessing). The proposed model also has superior true positive and true negative rates. We also investigate the timeliness of project data and find that old project data is gradually becoming less relevant and losing predictive power to newly created projects. Overall, this study provides evidence that antecedents identified from project descriptions have incremental predictive power and can help project owners evaluate and improve the likelihood of funding success.

  4. Project descriptions

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    This part specifies the activities and project tasks of each project broken down according to types of financing, listing the current projects Lw 1 through 3 funded by long-term provisions (budget), the current projects LB 1 and 2, LG 1 through 5, LK1, LM1, and LU 1 through 6 financed from special funds, and the planned projects ZG 1 through 4 and ZU 1, also financed from special funds. (DG) [de

  5. Regulatory research and support program for 1988/89 - project descriptions

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-03-15

    Information Bulletin, 1988. Project descriptions for the Regulatory Research and Support Program. This Information Bulletin contains a list of the projects with a brief description of each, and additional supporting information.

  6. Regulatory research and support program for 1988/89 - project descriptions

    International Nuclear Information System (INIS)

    1988-01-01

    Information Bulletin, 1988. Project descriptions for the Regulatory Research and Support Program. This Information Bulletin contains a list of the projects with a brief description of each, and additional supporting information

  7. High Luminosity LHC Project Description

    CERN Document Server

    Apollinari, Giorgio; Rossi, Lucio

    2014-01-01

    The High Luminosity LHC (HL-LHC) is a novel configuration of the Large Hadron Collider, aiming at increasing the luminosity by a factor five or more above the nominal LHC design, to allow increasing the integrated luminosity, in the high luminosity experiments ATLAS and CMS, from the 300 fb-1 of the LHC original design up to 3000 fb-1 or more. This paper contains a short description of the main machine parameters and of the main equipment that need to be developed and installed. The preliminary cost evaluation and the time plan are presented, too. Finally, the international collaboration that is supporting the project, the governance and the project structure are discussed, too.

  8. A report to Congress on Nuclear Regulatory research: Project descriptions for FY87

    International Nuclear Information System (INIS)

    1987-02-01

    The report presents project descriptions of NRC research projects funded in Fiscal Year 1987. The individual project descriptions presented in this report are divided into six major groups of related projects. These groups, called issues, are as follows: Severe Accident, Risk and Reliability, Thermal Hydraulic Transients, Plant Aging and Life Extension, Seismic Research, and Waste Management. Within each issue, the project descriptions are further divided into subgroups, called subissues. An overview is provided prior to each issue and subissue giving a statement of the problem being addressed and the research objectives

  9. RA-8 brief description. Critical set for CAREM project

    International Nuclear Information System (INIS)

    Boado, H.; Girardi, A.

    1990-01-01

    A RA-8 critical set, intended to study the core's neutronic characteristics for the CAREM project, is described. The description is a design criteria synthesis of the plant's main systems, its use in the project and the experimental purposes to be reached. (Author) [es

  10. Water Resources Research Grant Program project descriptions, fiscal year 1987

    Science.gov (United States)

    ,

    1987-01-01

    This report contains information on the 34 new projects funded by the United States Geological Survey 's Water Resources Research Grant Program in fiscal year 1987 and on 3 projects completed during the year. For the new projects, the report gives the grant number, project title, performing organization, principal investigator(s), and a project description that includes: (1) identification of water related problems and problem-solution approach (2) contribution to problem solution, (3) objectives, and (4) approach. The 34 projects include 12 in the area of groundwater quality problems, 12 in the science and technology of water quality management, 1 in climate variability and the hydrologic cycle, 4 in institutional change in water resources management, and 5 in surface water management. For the three completed projects, the report furnishes the grant number; project title; performing organization; principal investor(s); starting data; data of receipt of final report; and an abstract of the final report. Each project description provides the information needed to obtain a copy of the final report. The report contains tables showing: (1) proposals received according to area of research interest, (2) grant awards and funding according to area of research interest, (3) proposals received according to type of submitting organization, and (4) awards and funding according to type of organization. (Author 's abstract)

  11. A description of the PISC project

    International Nuclear Information System (INIS)

    1979-01-01

    This report, written as an historical review of the Plate Inspection Steering Committee project, records the background of the project and refers in general to the reasons why decisions were made during the four years the project has been running. Details are given in further reports, of which the full list, issued by the Commission of the European Communities, is as follows: Report no.1 - A description of the PISC project. Report no.2 - Ultrasonic examination of the PVRC plates nos. 50/52, 51/53 and 204. Report no.3 - Destructive examination of the PVRC plates nos. 50/52, 51/53 and 204. Report no.4 - Analysis scheme of the PISC trials results. Report no.5 - Evaluation of the PISC trials results. A list of all participants is given. Data and results of the test programme are detailed in the other reports above, but to maintain confidentiality of data the individual teams have been allocated a code number known only to the team and the PISC management. Data are only identified against code numbers. A report on conclusions and recommendations of the whole PISC programme will be published by the OECD-Committee on the Safety of Nuclear Installations (CSNI) and presented at its annual meeting 1979

  12. Research reactor job analysis - A project description

    International Nuclear Information System (INIS)

    Yoder, John; Bessler, Nancy J.

    1988-01-01

    Addressing the need of the improved training in nuclear industry, nuclear utilities established training program guidelines based on Performance-Based Training (PBT) concepts. The comparison of commercial nuclear power facilities with research and test reactors owned by the U.S. Department of Energy (DOE), made in an independent review of personnel selection, training, and qualification requirements for DOE-owned reactors pointed out that the complexity of the most critical tasks in research reactors is less than that in power reactors. The U.S. Department of Energy (DOE) started a project by commissioning Oak Ridge Associated Universities (ORAU) to conduct a job analysis survey of representative research reactor facilities. The output of the project consists of two publications: Volume 1 - Research Reactor Job Analysis: Overview, which contains an Introduction, Project Description, Project Methodology,, and. An Overview of Performance-Based Training (PBT); and Volume 2 - Research Reactor Job Analysis: Implementation, which contains Guidelines for Application of Preliminary Task Lists and Preliminary Task Lists for Reactor Operators and Supervisory Reactor Operators

  13. A report to Congress Nuclear Regulatory Research: Project descriptions for FY88

    International Nuclear Information System (INIS)

    1988-08-01

    This report has been written in response to a request of the United States Congress that the Nuclear Regulatory Commission prepare and submit to the Congress a summary description of its research projects. Commercial contracts and research efforts at the Department of Energy (DOE) laboratories are assigned a five-digit financial number (FIN). This report provides a project descriptions for each FIN number. The project descriptions are divided into five major sections called program areas. These areas are: integrity of reactor components, prevent damage to reactor cores, reactor containment safety, confirming safety of nuclear waste disposal, and resolving safety issues and developing regulations. An explanation of each program area is given in an overview at the beginning of each section

  14. Plutonium immobilization project development and testing technical project office quality assurance program description

    International Nuclear Information System (INIS)

    Gould, T.H.; MacLean, L.M.; Ziemba, J.M.

    1999-01-01

    The Plutonium Immobilization Project (PIP) is one of several fissile materials disposition projects managed by the Department of Energy (DOE) Office of Fissile Materials Disposition (OFMD). The PIP is expected to evolve from the current Development and Testing (D and T) effort, to design, to construction, and finally to operations. Overall management and technical management of the D and T effort resides at the Lead Laboratory, Lawrence Livermore National Laboratory (LLNL), through the LLNL Manager, Fissile Materials Disposition Program (FMDP). Day to day project activities are managed by the D and T Technical Project Office (TPO), which reports to the LLNL Manager, FMDP. The D and T TPO consists of the Technical Manager, the TPO Quality Assurance (QA) Program Manager, and TPO Planning and Support Staff. This Quality Assurance Program Description (QAPD) defines the QA policies and controls that will be implemented by these TPO personnel in their management of D and T activities. This QAPD is consistent with and responsive to the Department of Energy Fissile Materials Disposition Program Quality Assurance Requirements Document (FMDP QARD). As the Project and upper level requirement's documents evolve, this QAPD will be updated as necessary to accurately define and describe the QA Program and Management of the PIP. The TPO has a policy that all development and testing activities be planned, performed and assessed in accordance with its customer's requirements, needs and expectations, and with a commitment to excellence and continuous improvement. The TPO QAPD describes implementation requirements which, when completed, will ensure that the project development and testing activities conform to the appropriate QA requirements. For the program to be effective, the TPO QA Program Manager will ensure that each site participating in D and T activities has developed a QAPD, which meets the customer's requirements, and has a designated quality leader in place. These customer

  15. Monitored Geologic Repository Project Description Document

    International Nuclear Information System (INIS)

    Curry, P. M.

    2001-01-01

    The primary objective of the Monitored Geologic Repository Project Description Document (PDD) is to allocate the functions, requirements, and assumptions to the systems at Level 5 of the Civilian Radioactive Waste Management System (CRWMS) architecture identified in Section 4. It provides traceability of the requirements to those contained in Section 3 of the ''Monitored Geologic Repository Requirements Document'' (MGR RD) (YMP 2000a) and other higher-level requirements documents. In addition, the PDD allocates design related assumptions to work products of non-design organizations. The document provides Monitored Geologic Repository (MGR) technical requirements in support of design and performance assessment in preparing for the Site Recommendation (SR) and License Application (LA) milestones. The technical requirements documented in the PDD are to be captured in the System Description Documents (SDDs) which address each of the systems at Level 5 of the CRWMS architecture. The design engineers obtain the technical requirements from the SDDs and by reference from the SDDs to the PDD. The design organizations and other organizations will obtain design related assumptions directly from the PDD. These organizations may establish additional assumptions for their individual activities, but such assumptions are not to conflict with the assumptions in the PDD. The PDD will serve as the primary link between the technical requirements captured in the SDDs and the design requirements captured in US Department of Energy (DOE) documents. The approved PDD is placed under Level 3 baseline control by the CRWMS Management and Operating Contractor (M and O) and the following portions of the PDD constitute the Technical Design Baseline for the MGR: the design characteristics listed in Table 1-1, the MGR Architecture (Section 4.1), the Technical Requirements (Section 5), and the Controlled Project Assumptions (Section 6)

  16. Monitored Geologic Repository Project Description Document

    International Nuclear Information System (INIS)

    Curry, P.

    2000-01-01

    The primary objective of the Monitored Geologic Repository Project Description Document (PDD) is to allocate the functions, requirements, and assumptions to the systems at Level 5 of the Civilian Radioactive Waste Management System (CRWMS) architecture identified in Section 4. It provides traceability of the requirements to those contained in Section 3 of the ''Monitored Geologic Repository Requirements Document'' (MGR RD) (CRWMS M and O 2000b) and other higher-level requirements documents. In addition, the PDD allocates design related assumptions to work products of non-design organizations. The document provides Monitored Geologic Repository (MGR) engineering design basis in support of design and performance assessment in preparing for the Site Recommendation (SR) and License Application (LA) milestones. The engineering design basis documented in the PDD is to be captured in the System Description Documents (SDDs) which address each of the systems at Level 5 of the CRWMS architecture. The design engineers obtain the engineering design basis from the SDDs and by reference from the SDDs to the PDD. The design organizations and other organizations will obtain design related assumptions directly from the PDD. These organizations may establish additional assumptions for their individual activities, but such assumptions are not to conflict with the assumptions in the PDD. The PDD will serve as the primary link between the engineering design basis captured in the SDDs and the design requirements captured in U.S. Department of Energy (DOE) documents. The approved PDD is placed under Level 3 baseline control by the CRWMS Management and Operating Contractor (M and O) and the following portions of the PDD constitute the Technical Design Baseline for the MGR: the design characteristics listed in Table 2-1, the MGR Architecture (Section 4.1),the Engineering Design Bases (Section 5), and the Controlled Project Assumptions (Section 6)

  17. Description of the Karoo Biome project

    CSIR Research Space (South Africa)

    Cowling, RM

    1986-01-01

    Full Text Available The ecological characteristics and ecological problems of the karoo biome are briefly described. A conceptual basis and guidelines for the development of the Karoo Biome Project are outlined by addressing project goals, project structure...

  18. Baseline process description for simulating plutonium oxide production for precalc project

    Energy Technology Data Exchange (ETDEWEB)

    Pike, J. A. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-10-26

    Savannah River National Laboratory (SRNL) started a multi-year project, the PreCalc Project, to develop a computational simulation of a plutonium oxide (PuO2) production facility with the objective to study the fundamental relationships between morphological and physicochemical properties. This report provides a detailed baseline process description to be used by SRNL personnel and collaborators to facilitate the initial design and construction of the simulation. The PreCalc Project team selected the HB-Line Plutonium Finishing Facility as the basis for a nominal baseline process since the facility is operational and significant model validation data can be obtained. The process boundary as well as process and facility design details necessary for multi-scale, multi-physics models are provided.

  19. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Appendix A: BP Exploration (Alaska) Inc. Final project description - Revision 1, March 27, 1997

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains Appendix A of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment. This document is the Northstar Development Project, Final Project Description, Revision 1 for BPXA Northstar Project

  20. Competency model for the project managers of technical projects

    Science.gov (United States)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  1. Description of the Fynbos Biome Project

    CSIR Research Space (South Africa)

    Kruger, FJ

    1978-06-01

    Full Text Available The objectives, organization and research programme of the Fynbos Biome Project being undertaken in the south-west and southern Cape are described. The project is a cooperative multi-disciplinary study of the ecological characteristics, structure...

  2. Organizations, projects and culture

    NARCIS (Netherlands)

    J. van Cleeff; Pieter van Nispen tot Pannerden

    2016-01-01

    Purpose: to explore and demonstrate the effects of organizational culture on projects, in particular project culture and project management style. Methodology/approach: descriptive and explorative; through students’ groups. Findings: the cultural relationship between organizations, their projects

  3. The water reactor safety research project index: a description of the computerized system for its databank

    International Nuclear Information System (INIS)

    Della Loggia, E.; Primavera, R.

    1993-01-01

    The water reactor nuclear safety research project index has been published by the CEC for many years as a compilation of information on research projects relating to LWR nuclear safety. Since 1981, it has been published, alternatively with NEA (OECD), every second year. The number of contributions from research organizations in Community member countries has steadily increased and reached the level of 1 700 pages, in which more than 600 project descriptions have been collected. In 1988, for the first time, the document was produced using a computerized system developed with the assistance of the ISEI (Institute for Systems Engineering and Informatics) of JRC Ispra. The data have been stored in a computer based in Ispra. The system allows searching a preselected set of subjects through the information stored in the computer: it makes the updating of the projects description much easier and makes the retrieval of the data possible. This report presents a short description of the computerized system developed for the databank of the index. The computerized system presented in this report is structured in a quite general way and for that reason can be adapted very easily to every field where a databank needs to be constituted in order to collect extended information on several projects. (authors). 6 figs., 5 tabs., 5 refs

  4. Storytelling in Projects

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas; Andersen, Peter Bøgh

    2006-01-01

    project managers should not only be concerned with project plans, but also with project stories. In this paper we explore some basic principles for transforming project plans into appealing stories. We discuss what may happen to stories once they are released into public space. And we illustrate how......Plans and stories are two different ways of communicating about projects. Project plans are formalized descriptions, primarily supporting coordination. Project stories are accounts whose primary function is emotional appeal. Project stories influence the projects’ chances of success. Therefore...... the possibilities of telling favorable stories may have repercussions on the project planning....

  5. Project Tasks in Robotics

    DEFF Research Database (Denmark)

    Sørensen, Torben; Hansen, Poul Erik

    1998-01-01

    Description of the compulsary project tasks to be carried out as a part of DTU course 72238 Robotics......Description of the compulsary project tasks to be carried out as a part of DTU course 72238 Robotics...

  6. Waste management project technical baseline description

    International Nuclear Information System (INIS)

    Sederburg, J.P.

    1997-01-01

    A systems engineering approach has been taken to describe the technical baseline under which the Waste Management Project is currently operating. The document contains a mission analysis, function analysis, requirement analysis, interface definitions, alternative analysis, system definition, documentation requirements, implementation definitions, and discussion of uncertainties facing the Project

  7. Project management. A discipline which contributes to project success

    International Nuclear Information System (INIS)

    Hoch, G.

    2008-01-01

    The presentation covers the following topics: description of the Project - a contract was signed between KNPP and European Consortium Kozloduy (ECK) consisting of Framatome ANP GmbH as Leader (63%), Framatome ANP S.A.S. (17%), Atomenergoexport (20%) ; Project management in the modernization of NPP Kozloduy units 5 and 6; Project management process within AREVA NP GmbH; current status

  8. Integrated project support environments the ASPECT project

    CERN Document Server

    Brown, Alan W

    1991-01-01

    A major part of software engineering developments involve the use of computing tools which facilitate the management, maintenance, security, and building of long-scale software engineer projects. Consequently, there have been a proliferation of CASE tools and IPSES. This book looks at IPSES in general and the ASPECT project in particular, providing design and implementation details, as well as locating ASPECT in IPSE developments.Survey of integrated project support environments for more efficient software engineering**Description of a large scale IPSE--ASPECT**Evaluation of formal methods in

  9. Description of SODAR data storage. WISE project WP2

    International Nuclear Information System (INIS)

    Barhorst, S.A.M.; Verhoef, J.P.; Van der Werff, P.A.; Eecen, P.J.

    2003-10-01

    The partners in the WISE project are investigating whether application of the SODAR (sonic detection and ranging) measurement technique in wind energy experimental work is feasible as a replacement for cup anemometers and wind direction sensors mounted on tall meteorological masts both from the view of accuracy and cost. In Work Package 2 (WP2) of the WISE project extensive controlled experiments with the SODAR have been performed. For example, SODAR measurements have been compared with measurements from nearby masts and different brands of SODARs have been compared. Part of the work package was the creation of a database to gather the measured SODAR data. The database was created by ECN in order to enable further analysis by the partners in the project. The database structure that has been defined by ECN is described in full detail. The database is based on SQL (structured query language), and care is taken that data that is unchanged during a measurement period is only stored once. The logic behind the structure is described and the relations between the various tables are described. Up to now the description of the database is limited to include SODAR data measured close to a meteorological mast. Power measurements from wind turbines are not yet included. However, the database can easily be extended to include these data. The data measured by means of the ECN SODAR have completely been re-processed. A new directory structure was defined which is accessible from both the Unix (Linux) and the Microsoft Windows platform. The processed and validated data have been stored in a database to make retrieval of specific data sets possible. The database is also accessible from the Windows platform. The defined format is available for the WISE project, so that the database containing data from all partners can be created

  10. Harvard Project Physics Newsletter 10. The Project Physics Course, Text.

    Science.gov (United States)

    Harvard Univ., Cambridge, MA. Harvard Project Physics.

    A short description of the availability of Harvard Project Physics course components is given as is a discussion of the growth of the use of Project Physics in schools, including some enrollment data and survey results. Locations of the 1970 and 1971 Summer Institutes are listed. Adaptations of Project Physics course outside the United States are…

  11. Projected shell model description of N = 114 superdeformed isotone nuclei

    International Nuclear Information System (INIS)

    Guo, R S; Chen, L M; Chou, C H

    2006-01-01

    A systematic description of the yrast superdeformed (SD) bands in N 114, Z = 80-84 isotone nuclei using the projected shell model is presented. The calculated γ-ray energies, moment of inertia and M1 transitions are compared with the data for which spin is assigned. Excellent agreement with the available data for all isotones is obtained. The calculated electromagnetic properties provide a microscopic understanding of those measured nuclei. Some predictions in superdeformed nuclei are also discussed

  12. Experimental Plasma Research project summaries

    International Nuclear Information System (INIS)

    1980-09-01

    This report contains descriptions of the activities supported by the Experimental Plasma Research Branch of APP. The individual project summaries were prepared by the principal investigators and include objectives and milestones for each project. The projects are arranged in six research categories: Plasma Properties; Plasma Heating; Plasma Diagnostics; Atomic, Molecular and Nuclear Physics; Advanced Superconducting Materials; and the Fusion Plasma Research Facility (FPRF). Each category is introduced with a statement of objectives and recent progress and followed by descriptions of individual projects. An overall budget summary is provided at the beginning of the report

  13. Experimental Plasma Research project summaries

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-09-01

    This report contains descriptions of the activities supported by the Experimental Plasma Research Branch of APP. The individual project summaries were prepared by the principal investigators and include objectives and milestones for each project. The projects are arranged in six research categories: Plasma Properties; Plasma Heating; Plasma Diagnostics; Atomic, Molecular and Nuclear Physics; Advanced Superconducting Materials; and the Fusion Plasma Research Facility (FPRF). Each category is introduced with a statement of objectives and recent progress and followed by descriptions of individual projects. An overall budget summary is provided at the beginning of the report.

  14. Experimental plasma research project summaries

    International Nuclear Information System (INIS)

    1978-08-01

    This report contans descriptions of the activities supported by the Experimental Plasma Research Branch of APP. The individual project summaries were prepared by the principal investigators and include objectives and milestones for each project. The projects are arranged in six research categories: Plasma Properties; Plasma Heating; Plasma Measurements and Instrumentation; Atomic, Molecular and Nuclear Physics; Advanced Superconducting Materials; and the Fusion Plasma Research Facility (FPRF). Each category is introduced with a statement of objectives and recent progress and followed by descriptions of individual projects. An overall budget summary is provided at the beginning of the report

  15. A technical description of the FlexHouse Project Testbed

    DEFF Research Database (Denmark)

    Sørensen, Jens Otto

    2000-01-01

    This paper describes the FlexHouse project testbed; a server dedicated to experiments within the FlexHouse project. The FlexHouse project is a project originating from The Business Computing Research Group at The Aarhus School of Business. The purpose of the project is to identify and develop...... methods that satisfy the following three requirements. Flexibility with respect to evolving data sources. Flexibility with respect to change of information needs. Efficiency with respect to view management....

  16. Description of a project management system software tool (Sugar)

    International Nuclear Information System (INIS)

    Saito, T.

    2000-01-01

    Toshiba has developed a project management tool that can be applied to large-scale and complicated projects such as the outage of a nuclear power station. The project management tool (Sugar) which Toshiba developed is excellent in operative visibility and extendibility, and has been developed from the beginning for use in nuclear periodic-inspection project control. Here, the development circumstances of this project management tool (Sugar) and the feature are described, and an easy demonstration is provided as an example. (author)

  17. Description of Project Sapphire. Revision 1

    International Nuclear Information System (INIS)

    Taylor, R.G.

    1995-01-01

    The mission of Project Sapphire was to repackage approximately 600 kg of highly enriched uranium (HEU) in the Republic of Kazakhstan into internationally acceptable shipping packages and transport the material to a storage location in the United States. There were four material types to be repackaged: metal; oxide; uranium/beryllium (U/Be) alloy; and residues from U/Be alloy production. Seven major steps described in this report were necessary for successful execution of the project: planning and training; readiness assessment; deployment; set up; process; take down; and transport. Nuclear criticality safety especially affected several of these steps

  18. Advanced fusion concepts project summaries: 1981

    International Nuclear Information System (INIS)

    1982-03-01

    This report contains descriptions of the activities of all the projects supported by the Advanced Fusion Concepts Branch of the Office of Fusion Energy, US Department of Energy. These descriptions are project summaries of each of the individual projects, and contain the following: title, principle investigators, funding levels, purpose, approach, progress, plans, milestones, graduate students, graduates, other professional staff, and recent publications

  19. Project plan remove special nuclear material from PFP project plutonium finishing plant

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process

  20. MORE: Management of requirements in NPP modernisation projects. Project report 2007

    International Nuclear Information System (INIS)

    Fredriksen, R.; Katta, V.; Raspotnig, C.; Valkonen, J.

    2008-03-01

    This report documents the work and related activities of the MORE project in the period January 1 - December 31 in 2007. The focus of this report is on improvements of the former project results, to identify and apply a couple of case studies from NPP projects, and activities in order to initiate and implement the industrial take-up and utilisation of the research results in real modernisation projects. The report also provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  1. MORE: Management of requirements in NPP modernisation projects. Project report 2007

    Energy Technology Data Exchange (ETDEWEB)

    Fredriksen, R.; Katta, V.; Raspotnig, C. [Institutt for energiteknikk (IFE) (Norway); Valkonen, J. [Technical Research Centre of Finland (VTT) (Finland)

    2008-03-15

    This report documents the work and related activities of the MORE project in the period January 1 - December 31 in 2007. The focus of this report is on improvements of the former project results, to identify and apply a couple of case studies from NPP projects, and activities in order to initiate and implement the industrial take-up and utilisation of the research results in real modernisation projects. The report also provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  2. The projective hinge: phylogeny and ontogeny for a new descriptive geometry

    Directory of Open Access Journals (Sweden)

    Agostino De Rosa

    2012-06-01

    Full Text Available The architect- draughtsman uses a theoretical–graphic code whose foundations - of obvious Platonic lineage - attempt to organize and make sense to the reality. Perhaps the most powerful tool that he has in his hands  to translate the existing world in a dense and polysemous model and to envisage the future one, in a compelling and creative way, becomes from descriptive geometry. Today, the context in which the architect works is violently changed and the "geometry", in the digital image, seems to have lost memory of its projective origins. Two loci - one related to the stonecutting’s tradition, the other to the experiences of contemporary art - seem to be able to bring out in a renewed way, "the figures of the demonstration" associated with descriptive geometry.

  3. Mirror Confinement Systems: project summaries

    International Nuclear Information System (INIS)

    1980-07-01

    This report contains descriptions of the projects supported by the Mirror Confinement Systems (MCS) Division of the Office of Fusion Energy. The individual project summaries were prepared by the principal investigators, in collaboration with MCS staff office, and include objectives and milestones for each project. In addition to project summaries, statements of Division objectives and budget summaries are also provided

  4. Advanced fusion concepts: project summaries

    International Nuclear Information System (INIS)

    1980-12-01

    This report contains descriptions of the activities of all the projects supported by the Advanced Fusion Concepts Branch of the Office of Fusion Energy, US Department of Energy. These descriptions are project summaries of each of the individual projects, and contain the following: title, principle investigators, funding levels, purpose, approach, progress, plans, milestones, graduate students, graduates, other professional staff, and recent publications. Information is given for each of the following programs: (1) reverse-field pinch, (2) compact toroid, (3) alternate fuel/multipoles, (4) stellarator/torsatron, (5) linear magnetic fusion, (6) liners, and (7) Tormac

  5. Techniques for Analysing Problems in Engineering Projects

    DEFF Research Database (Denmark)

    Thorsteinsson, Uffe

    1998-01-01

    Description of how CPM network can be used for analysing complex problems in engineering projects.......Description of how CPM network can be used for analysing complex problems in engineering projects....

  6. Descriptive and Computer Aided Drawing Perspective on an Unfolded Polyhedral Projection Surface

    Science.gov (United States)

    Dzwierzynska, Jolanta

    2017-10-01

    The aim of the herby study is to develop a method of direct and practical mapping of perspective on an unfolded prism polyhedral projection surface. The considered perspective representation is a rectilinear central projection onto a surface composed of several flat elements. In the paper two descriptive methods of drawing perspective are presented: direct and indirect. The graphical mapping of the effects of the representation is realized directly on the unfolded flat projection surface. That is due to the projective and graphical connection between points displayed on the polyhedral background and their counterparts received on the unfolded flat surface. For a significant improvement of the construction of line, analytical algorithms are formulated. They draw a perspective image of a segment of line passing through two different points determined by their coordinates in a spatial coordinate system of axis x, y, z. Compared to other perspective construction methods that use information about points, for computer vision and the computer aided design, our algorithms utilize data about lines, which are applied very often in architectural forms. Possibility of drawing lines in the considered perspective enables drawing an edge perspective image of an architectural object. The application of the changeable base elements of perspective as a horizon height and a station point location enable drawing perspective image from different viewing positions. The analytical algorithms for drawing perspective images are formulated in Mathcad software, however, they can be implemented in the majority of computer graphical packages, which can make drawing perspective more efficient and easier. The representation presented in the paper and the way of its direct mapping on the flat unfolded projection surface can find application in presentation of architectural space in advertisement and art.

  7. Review of Project SAFE: Comments on biosphere conceptual model description and risk assessment methodology

    International Nuclear Information System (INIS)

    Klos, Richard; Wilmot, Roger

    2002-09-01

    The Swedish Nuclear Fuel and Waste Management Company's (SKB's) most recent assessment of the safety of the Forsmark repository for low-level and intermediate-level waste (Project SAFE) is currently undergoing review by the Swedish regulators. As part of its review, the Swedish Radiation Protection Institute (SSI) identified that two components of SAFE require more detailed review: (i) the conceptual model description of the biosphere system, and (ii) SKB's risk assessment methodology. We have reviewed the biosphere system interaction matrix and how this has been used in the identification, justification and description of biosphere models for radiological assessment purposes. The risk assessment methodology has been reviewed considering in particular issues associated with scenario selection, assessment timescale, and the probability and risk associated with the well scenario. There is an extensive range of supporting information on which biosphere modelling in Project SAFE is based. However, the link between this material and the biosphere models themselves is not clearly set out. This leads to some contradictions and mis-matches between description and implementation. One example concerns the representation of the geosphere-biosphere interface. The supporting description of lakes indicates that interaction between groundwaters entering the biosphere through lake bed sediments could lead to accumulations of radionuclides in sediments. These sediments may become agricultural areas at some time in the future. In the numerical modelling of the biosphere carried out in Project SAFE, the direct accumulation of contaminants in bed sediments is not represented. Application of a more rigorous procedure to ensure numerical models are fit for purpose is recommended, paying more attention to issues associated with the geosphere-biosphere interface. A more structured approach to risk assessment would be beneficial, with a better explanation of the difference between

  8. Severe fuel damage projects

    International Nuclear Information System (INIS)

    Sdouz, G.

    1987-10-01

    After the descriptions of the generation of a Severe Fuel Damage Accident in a LWR the hypothetical course of such an accident is explained. Then the most significant projects are described. At each project the experimental facility, the most important results and the concluding models and codes are discussed. The selection of the projects is concentrated on the German Projekt Nukleare Sicherheit (PNS), tests performed at the Idaho National Engineering Laboratory (INEL) and smaller projects in France and Great Britain. 25 refs., 26 figs. (Author)

  9. Four Approaches to Project Evaluation

    DEFF Research Database (Denmark)

    Laursen, Markus; Svejvig, Per; Rode, Anna Le Gerstrøm

    . Each of the framework’s four approaches provides a distinct evaluation that sheds light on some issues while leaving others unattended. Following these lines, the paper calls for more multi-faceted project evaluations. Introducing a framework that can help analyze existing evaluations and structure......There are many theoretical and practical reasons for evaluating projects – including explorative arguments focusing on expanding descriptive knowledge on project work as well as normative arguments focusing on improving prescriptive models of project performance. Despite the need for project...... management methodologies that work and combat project failure, and research methods that can assess effective project management and methodologies, as well as empirical research on the actuality of projects as practice, evaluation research on projects including project management and methodologies is scarce...

  10. Salt Repository Project: FY 85 technical project plan

    International Nuclear Information System (INIS)

    1985-07-01

    The FY 85 technical plan for the Salt Repository Project is briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management Program are discussed, and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 work breakdown structure tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Exploratory Shaft, Test Facilities, Land Acquisition, and Project Management) in the various sections. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. A strategy diagram and a master schedule are included and each of the milestones is also listed chronologically in the sections

  11. Advanced Fusion Concepts project summaries, FY 1982

    International Nuclear Information System (INIS)

    1982-10-01

    This report contains descriptions of the activities of all the projects supported by the Advanced Fusion Concepts Branch of the Office of Fusion Energy, U.S. Department of Energy. These descriptions are project summaries of each of the individual projects, and contain the following: title, principle investigators, funding levels, purpose, approach, progress, plans, milestones, graduate students, graduates, other professional staff, and recent publications

  12. Advanced Fusion Concepts project summaries. FY 1983

    International Nuclear Information System (INIS)

    1983-06-01

    This report contains descriptions of the activities of all the projects supported by the Advanced Fusion Concepts Branch of the Office of Fusion Energy, US Department of Energy. These descriptions are project summaries of each of the individual projects, and contain the following: title, principle investigators, funding levels, purpose, approach, progress, plans, milestones, graduate studients, graduates, other professional staff, and recent publications. The individual project summaries are prepared by the principle investigators in collaboration with the Advanced Fusion Concepts (AFC) Branch. In addition to the project summaries, statements of branch objectives, and budget summaries are also provided

  13. Project plan remove special nuclear material from PFP project plutonium finishing plant; TOPICAL

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617,Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process

  14. Microwave solidification project overview

    Energy Technology Data Exchange (ETDEWEB)

    Sprenger, G.

    1993-01-01

    The Rocky Flats Plant Microwave Solidification Project has application potential to the Mixed Waste Treatment Project and the The Mixed Waste Integrated Program. The technical areas being addressed include (1) waste destruction and stabilization; (2) final waste form; and (3) front-end waste handling and feed preparation. This document covers need for such a program; technology description; significance; regulatory requirements; and accomplishments to date. A list of significant reports published under this project is included.

  15. Microwave solidification project overview

    International Nuclear Information System (INIS)

    Sprenger, G.

    1993-01-01

    The Rocky Flats Plant Microwave Solidification Project has application potential to the Mixed Waste Treatment Project and the The Mixed Waste Integrated Program. The technical areas being addressed include (1) waste destruction and stabilization; (2) final waste form; and (3) front-end waste handling and feed preparation. This document covers need for such a program; technology description; significance; regulatory requirements; and accomplishments to date. A list of significant reports published under this project is included

  16. Description of the Grassland Biome Project

    CSIR Research Space (South Africa)

    Mentis, MT

    1982-10-01

    Full Text Available The objectives, organization and research programme of the Grassland Biome Project are described against a background of the biome's ecological characteristics and environmental problems. Four principal research topics wil 1 be focused upon: (i...

  17. Treatment of Berkeley boilers in Studsvik. Project description and experiences - Berkeley Boilers Project

    International Nuclear Information System (INIS)

    Saul, Dave; Davidson, Gavin; Wirendal, Bo

    2014-01-01

    In November 2011 Studsvik was awarded a contract to transport five decommissioned boilers from the Berkeley Nuclear Licensed Site in the UK to the Studsvik Nuclear Site in Sweden for metal treatment and recycling. A key objective of the project was to remove the boilers from the site by 31 March 2012 and this was successfully achieved with all boilers off site by 22 March and delivered to Studsvik on 6 April. In November 2012 Studsvik was awarded a further contract for the remaining ten Berkeley Boilers with the requirement to remove all boilers from the Berkeley site by 31 March 2013. Again this was successfully achieved ahead of programme with all boilers in Sweden by 1 April 2013. A total of nine boilers have now been processed and all remaining boilers will be completed by end of September 2014. The projects have had many challenges including a very tight timescale and both have been successfully delivered to cost and ahead of the baseline programme. This paper describes the project and the experience gained from treatment of the boilers to date. (authors)

  18. SHORTENING THE PROJECT LIFE CYCLE IN INFORMATION TECHNOLOGY AND TELECOMUNICATION PROJECTS

    OpenAIRE

    Florian Buitrago, Armando Alejandro

    2013-01-01

    The motivation for this thesis is based on the fact that telecommunications projects have increased their complexity; nowadays, customers claim for the implementation of large solutions including multiple vendors, software and hardware with highly customizable features and short deadlines that continuously challenge project managers and telecommunications practitioners to create value for their customers.This thesis focuses on the description of current practices in the telecommunications i...

  19. Clean Coal Technology Programs: Completed Projects (Volume 2)

    Energy Technology Data Exchange (ETDEWEB)

    Assistant Secretary for Fossil Energy

    2003-12-01

    Annual report on the Clean Coal Technology Demonstration Program (CCTDP), Power Plant Improvement Initiative (PPII), and Clean Coal Power Initiative (CCPI). The report addresses the roles of the programs, implementation, funding and costs, project descriptions, legislative history, program history, environmental aspects, and project contacts. The project descriptions describe the technology and provides a brief summary of the demonstration results.

  20. Swedish projects

    International Nuclear Information System (INIS)

    Thunell, J.

    1992-01-01

    A description is given of research activities, concerning heating systems, which were carried out in Sweden during 1991. The main subject areas dealt with under the gas technology group within the area of heating systems were catalytic combustion, polyethylene materials, and gas applications within the paper and pulp industries. A list is given of the titles of project reports published during 1991 and of those begun during that year. Under the Swedish Centre for Gas Technology (SGC), the main areas of research regarding gas applications were polyethylene materials, industrial applications and the reduction of pollutant emissions. A detailed list is given of research projects which were in progress or proposed by March 1992 under the heating system gas technology research group in Sweden. This list also presents the aims and descriptions of the methods, etc. (AB)

  1. Review of Project SAFE: Comments on biosphere conceptual model description and risk assessment methodology

    Energy Technology Data Exchange (ETDEWEB)

    Klos, Richard; Wilmot, Roger [Galson Sciences Ltd (United Kingdom)

    2002-09-01

    The Swedish Nuclear Fuel and Waste Management Company's (SKB's) most recent assessment of the safety of the Forsmark repository for low-level and intermediate-level waste (Project SAFE) is currently undergoing review by the Swedish regulators. As part of its review, the Swedish Radiation Protection Institute (SSI) identified that two components of SAFE require more detailed review: (i) the conceptual model description of the biosphere system, and (ii) SKB's risk assessment methodology. We have reviewed the biosphere system interaction matrix and how this has been used in the identification, justification and description of biosphere models for radiological assessment purposes. The risk assessment methodology has been reviewed considering in particular issues associated with scenario selection, assessment timescale, and the probability and risk associated with the well scenario. There is an extensive range of supporting information on which biosphere modelling in Project SAFE is based. However, the link between this material and the biosphere models themselves is not clearly set out. This leads to some contradictions and mis-matches between description and implementation. One example concerns the representation of the geosphere-biosphere interface. The supporting description of lakes indicates that interaction between groundwaters entering the biosphere through lake bed sediments could lead to accumulations of radionuclides in sediments. These sediments may become agricultural areas at some time in the future. In the numerical modelling of the biosphere carried out in Project SAFE, the direct accumulation of contaminants in bed sediments is not represented. Application of a more rigorous procedure to ensure numerical models are fit for purpose is recommended, paying more attention to issues associated with the geosphere-biosphere interface. A more structured approach to risk assessment would be beneficial, with a better explanation of the difference

  2. New Mexico State University Arrowhead Center PROSPER Project

    Energy Technology Data Exchange (ETDEWEB)

    Peach, James

    2012-12-31

    This document is the final technical report of the Arrowhead Center Prosper Project at New Mexico State University. The Prosper Project was a research and public policy initiative funded by the National Energy Technology Laboratory (NETL) of the U.S. Department of Energy (DOE). The Prosper project (DOE Grant Number DE-NT0004397) began on October 1, 2008 (FY2009, Quarter 1) and ended on December 31, 2012 (FY2013, Quarter 1). All project milestones were completed on time and within the budget. This report contains a summary of ten technical reports resulting from research conducted during the project. This report also contains a detailed description of the research dissemination and outreach activities of the project including a description of the policy impacts of the project. The report also describes project activities that will be maintained after the end of the project.

  3. 7 CFR 2903.6 - Project types.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Project types. 2903.6 Section 2903.6 Agriculture... AGRICULTURE BIODIESEL FUEL EDUCATION PROGRAM Program Description § 2903.6 Project types. OEPNU intends to... predetermined project period with a statement of intention to provide additional support at a future date...

  4. Project evaluation: one framework - four approaches

    DEFF Research Database (Denmark)

    Rode, Anna Le Gerstrøm; Svejvig, Per

    . Introducing a framework that can help structure such evaluations, the aim of this paper is to contribute to project theory and practice by inspiring project researchers and aiding project workers in their efforts to open up the black box of projects and deliver relevant and valuable results......There are many theoretical and practical reasons for evaluating projects – including explorative arguments focusing on expanding descriptive knowledge on projects as well as normative arguments focusing on developing prescriptive knowledge of project management. Despite the need for effective...... project management and research methods that can assess effective project management methodologies, extant literature on evaluation procedures or guidelines on how to evaluate projects and/or project management is scarce. To address this challenge, this paper introduces an evaluation framework consisting...

  5. Africa region population projections - 1988-89

    OpenAIRE

    Vu, My T.; Bos, Eduard; Bulatao, Rodolfo A.

    1988-01-01

    The report which is part of a series, presents population projection tables for each country in the Africa region. The report provides an explanation on projection results as well as a description of the projection methodology, summarizing the main results. The projections in the report cover the period 1985 - 2150. This time period allows countries to approach stability. The key elements in these projections are the base year (mid 1985). Total population estimates and age - sex structures ar...

  6. Project risk management: A review of an institutional project life cycle

    Directory of Open Access Journals (Sweden)

    Wanjiru Gachie

    2017-11-01

    Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects

  7. Nuclear safety project

    International Nuclear Information System (INIS)

    1982-06-01

    The Annual Report 1981 is a detailed description (in German language) of work within the Nuclear Safety Project performed in 1981 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes for each individual research activity short summaries in English language on - work completed - results obtained - plans for future work. This report was compiled by the project management. (orig.) [de

  8. Status of APE projects

    CERN Document Server

    Alfieri, R; Onofri, E; Bartoloni, A; Battista, C; Cabibbo, Nicola; Cosimi, M; Lonardo, A; Michelotti, A; Proietti, B; Rapuano, F; Rossetti, D; Sacco, G; Tassa, S; Torelli, M; Vicini, P; Pène, O; Errico, W; Magazzù, G; Sartori, L; Schiiano, F; Tripiccione, R; De Riso, P; Petronzio, Roberto; Destri, C; Frezzotti, R; Marchesini, G; Gensch, Ulrich; Jansen, K; Kretzschmann, A; Leich, H; Paschedag, N; Pleiter, D; Schwendicke, U; Simma, H; Sommer, Rainer; Sulanke, K; Wegner, P; Fucci, A; Martin, B; Pech, J; Panizzi, E; Petricola, A

    2001-01-01

    This talk is divided in two parts. In the first part, we will summarize the status of the APEmille project that will be completed by the end of the year. We will then devote the rest of the talk to the description of a new project for a multi-TeraFlop machine, ape NEXT. The interested reader will find a much more detailed discussion of all the items touched upon here in the full proposal of the project that will shortly appear on hep-lat. (9 refs).

  9. TRISTAN, electron-positron colliding beam project

    International Nuclear Information System (INIS)

    1987-03-01

    In this report e + e - colliding beam program which is now referred to as TRISTAN Project will be described. A brief chronology and outline of TRISTAN Project is given in Chapter 1. Chapter 2 of this article gives a discussion of physics objectives at TRISTAN. Chapter 3 treats the overall description of the accelerators. Chapter 4 describes design of each of the accelerator systems. In Chapter 5, detector facilities are discussed in some detail. A description of accelerator tunnels, experimental areas, and utilities are given in Chapter 6. In the Appendix, the publications on the TRISTAN Project are listed. (author)

  10. The Kyoto University tandem upgrading project

    International Nuclear Information System (INIS)

    Nakamura, Masanobu; Shimoura, Susumu; Takimoto, Kiyohiko; Sakaguchi, Harutaka; Kobayashi, Shinsaku

    1988-01-01

    A brief description on the Kyoto University tandem upgrading project. The project consists of replacing the old 5 MV tandem Van de Graaff by an 8UDH pelletron. The old pressure vessel and beam lines are used again without significant modification. The project is planned to be completed at the end of 1989. (orig.)

  11. Nuclear safety project

    International Nuclear Information System (INIS)

    1984-11-01

    The semiannual progress report 1984/1 is a description of work within the Nuclear Safety Project performed in the first six month of 1984 in the nuclear safety field by KfK institutes and departements and by external institutions on behalf of KfK. The chosen kind of this report is that of short summaries, containing the topics work performed, results obtained and plans for future work. This report was compiled by the project management. (orig./RW) [de

  12. Project Nuclear Safety

    International Nuclear Information System (INIS)

    1981-11-01

    The semiannual progress report 1981/1 is a description of work within the Nuclear Safety Project performed in the first six month of 1981 in the nuclear safety field by KfK institutes and departments and by external institutions on behalf of KfK. The chosen kind of this report is that of short summaries, containing the topics, work performed, results obtained, plans for future work. This report was compiled by the project management. (orig.) [de

  13. The HGF strategy project

    International Nuclear Information System (INIS)

    Knebel, J.U.; Fellmoser, F.; Lefhalm, C.; Mack, K.; Pettan, C.; Piecha, H.; Konys, J.; Adelhelm, C.; Glasbrenner, H.; Muscher, H.; Novotny, J.; Voss, Z.; Wedemeyer, O.; Mueller, G.; Heinzel, A.; Schumacher, G.; Huber, R.; Zimmermann, F.; Groetzbach, G.; Dorr, B.; Carteciano, L.N.

    2000-01-01

    Within the Hermann von Helmholtz-Gemeinschaft Deutscher Forschungszentren (HGF) an HGF-Strategy Fund Project entitled 'Innovative Technologies to Reduce Radiotoxicity' is funded since October 1999. The objectives of this HGF-Strategy Fund Project is the development of new methods and technologies to design and manufacture thin-walled and highly thermally-loaded surfaces which are cooled by a corrosive heavy liquid metal (lead-bismuth eutectic). The result of this project will be the basic scientific-technical tool which allows the conception and the design of a European Demonstrator of an ADS system (cf. 32.23.05). The work performed at Forschungszentrum Karlsruhe is embedded in a broad European research and development programme on ADS systems. The project is divided in three sub-projects: Sub-Project 1: Thermalhydraulic Investigations, Sub-Project 2: Material Specific Investigations, Sub-Project 3: Oxygen Control System. This progress report gives a general description of the project and its envisaged objectives. As a selection of the results achieved, first, FLUTAN calculations for the COULI beam window design and, second, the oxygen control system for the KArlsruhe Lead LAboratory KALLA are described in detail. Finally, the design and status of KALLA is given. (orig.)

  14. Two-spinor description of massive particles and relativistic spin projection operators

    Science.gov (United States)

    Isaev, A. P.; Podoinitsyn, M. A.

    2018-04-01

    On the basis of the Wigner unitary representations of the covering group ISL (2 , C) of the Poincaré group, we obtain spin-tensor wave functions of free massive particles with arbitrary spin. The wave functions automatically satisfy the Dirac-Pauli-Fierz equations. In the framework of the two-spinor formalism we construct spin-vectors of polarizations and obtain conditions that fix the corresponding relativistic spin projection operators (Behrends-Fronsdal projection operators). With the help of these conditions we find explicit expressions for relativistic spin projection operators for integer spins (Behrends-Fronsdal projection operators) and then find relativistic spin projection operators for half integer spins. These projection operators determine the numerators in the propagators of fields of relativistic particles. We deduce generalizations of the Behrends-Fronsdal projection operators for arbitrary space-time dimensions D > 2.

  15. Projective mapping

    DEFF Research Database (Denmark)

    Dehlholm, Christian; Brockhoff, Per B.; Bredie, Wender Laurentius Petrus

    2012-01-01

    by the practical testing environment. As a result of the changes, a reasonable assumption would be to question the consequences caused by the variations in method procedures. Here, the aim is to highlight the proven or hypothetic consequences of variations of Projective Mapping. Presented variations will include...... instructions and influence heavily the product placements and the descriptive vocabulary (Dehlholm et.al., 2012b). The type of assessors performing the method influences results with an extra aspect in Projective Mapping compared to more analytical tests, as the given spontaneous perceptions are much dependent......Projective Mapping (Risvik et.al., 1994) and its Napping (Pagès, 2003) variations have become increasingly popular in the sensory field for rapid collection of spontaneous product perceptions. It has been applied in variations which sometimes are caused by the purpose of the analysis and sometimes...

  16. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    Science.gov (United States)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  17. Two-spinor description of massive particles and relativistic spin projection operators

    Directory of Open Access Journals (Sweden)

    A.P. Isaev

    2018-04-01

    Full Text Available On the basis of the Wigner unitary representations of the covering group ISL(2,C of the Poincaré group, we obtain spin-tensor wave functions of free massive particles with arbitrary spin. The wave functions automatically satisfy the Dirac–Pauli–Fierz equations. In the framework of the two-spinor formalism we construct spin-vectors of polarizations and obtain conditions that fix the corresponding relativistic spin projection operators (Behrends–Fronsdal projection operators. With the help of these conditions we find explicit expressions for relativistic spin projection operators for integer spins (Behrends–Fronsdal projection operators and then find relativistic spin projection operators for half integer spins. These projection operators determine the numerators in the propagators of fields of relativistic particles. We deduce generalizations of the Behrends–Fronsdal projection operators for arbitrary space–time dimensions D>2.

  18. Spent Nuclear Fuel Project document control and Records Management Program Description

    International Nuclear Information System (INIS)

    MARTIN, B.M.

    2000-01-01

    The Spent Nuclear Fuel (SNF) Project document control and records management program, as defined within this document, is based on a broad spectrum of regulatory requirements, Department of Energy (DOE) and Project Hanford and SNF Project-specific direction and guidance. The SNF Project Execution Plan, HNF-3552, requires the control of documents and management of records under the auspices of configuration control, conduct of operations, training, quality assurance, work control, records management, data management, engineering and design control, operational readiness review, and project management and turnover. Implementation of the controls, systems, and processes necessary to ensure compliance with applicable requirements is facilitated through plans, directives, and procedures within the Project Hanford Management System (PHMS) and the SNF Project internal technical and administrative procedures systems. The documents cited within this document are those which directly establish or define the SNF Project document control and records management program. There are many peripheral documents that establish requirements and provide direction pertinent to managing specific types of documents that, for the sake of brevity and clarity, are not cited within this document

  19. Project Management Plan Solution Stabilization

    International Nuclear Information System (INIS)

    SATO, P.K.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process

  20. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  1. Project Leadership and Quality Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    SPG Buba

    2017-05-01

    Full Text Available Background: The construction industry in Nigeria, is pigeonholed by poor quality of construction products as a result of the inherent corruption in the country. Lack of purposeful leadership and inappropriate choice of leadership styles in the industry have been attributed to project failure. Abandoned and failed projects are more predominant in the public sector which litters every corner of the country. Objectives: The objective of this paper is to assess the impact of leadership styles on quality performance criteria of public projects in Nigeria. Methodology: A total of 43 questionnaires were distributed to 3 key groups of respondents (Quantity Surveyors, Builders, and Architects who are project managers in Nigeria. Descriptive and Inferential statistics were used to analyse the data using the Statistical Package for Social Sciences (SPSS. Likert Scale was used to measure the independent variables (leadership style: facilitative, coaching, delegating and directing; and the level of achievement of projects based on the dependent variables (quality and function performance criteria which are: achieving highest aesthetic quality; and functional building that fits its purpose. Findings: The study revealed that Directing is the major leadership style used by project managers in Nigeria. Amongst the leadership styles which has the most impact on quality performance indicators is also directing which has the most relative influence on achieving highest aesthetic quality and functional building that fits its purpose. Conclusion/Recommendation/Way forward: The underlying relationship between Directing leadership styles and the performance criteria of achieving highest aesthetic quality and functional building that fits its purpose will be beneficial to the Nigerian construction environment.

  2. Swedish projects

    International Nuclear Information System (INIS)

    Thunell, J.

    1993-01-01

    The main sources of the financing of Swedish research on gas technology are listed in addition to names of organizations which carry out this research. The titles and descriptions of the projects carried out are presented in addition to lists of reports published with information on prices. (AB)

  3. Project Plan For Remove Special Nuclear Material (SNM) from Plutonium Finishing Plant (PFP) Project

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove SNM Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617. This project plan is the top-level definitive project management document for the PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baseline to manage the execution of the Remove SNM Materials project. Any deviation to the document must be authorized through the appropriate change control process. The Remove SNM Materials project provides the necessary support and controls required for DOE-HQ, DOE-RL, BWHC, and other DOE Complex Contractors the path forward to negotiate shipped/receiver agreements, schedule shipments, and transfer material out of PFP to enable final deactivation

  4. 2015 Project Portfolio: Solid-State Lighting

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2015-01-30

    Overview of SSL projects currently funded by DOE, and those previously funded but since completed. Each profile includes a brief technical description, as well as information about project partners, funding, and the research period. This report is updated annually.

  5. 2017 Project Portfolio: Solid-State Lighting

    Energy Technology Data Exchange (ETDEWEB)

    None

    2017-01-02

    Overview of SSL projects currently funded by DOE, and those previously funded but since completed. Each profile includes a brief technical description, as well as information about project partners, funding, and the research period. This report is updated annually.

  6. Idaho National Laboratory Ten-Year Site Plan Project Description Document

    Energy Technology Data Exchange (ETDEWEB)

    Not Listed

    2012-03-01

    This document describes the currently active and proposed infrastructure projects listed in Appendix B of the Idaho National Laboratory 2013-2022 Ten Year Site Plan (DOE/ID-11449). It was produced in accordance with Contract Data Requirements List I.06. The projects delineated in this document support infrastructure needs at INL's Research and Education Campus, Materials and Fuels Complex, Advanced Test Reactor Complex and the greater site-wide area. The projects provide critical infrastructure needed to meet current and future INL opereational and research needs. Execution of these projects will restore, rebuild, and revitalize INL's physical infrastructure; enhance program execution, and make a significant contribution toward reducing complex-wide deferred maintenance.

  7. Photovoltaic concentrator technology development project. Sixth project integration meeting

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-01

    Thirty-three abstracts and short papers are presented which describe the current status of research, development, and demonstration of concentrator solar cell technology. Solar concentrators discussed include the parabolic trough, linear focus Fresnel lens, point focus Fresnel lens, and the parabolic dish. Solar cells studied include silicon, GaAs, and AlGaAs. Research on multiple junction cells, combined photovoltaic/thermal collectors, back contact solar cells, and beam splitter modules is described. Concentrator solar cell demonstration programs are reported. Contractor status summaries are given for 33 US DOE concentrator solar cell contracts; a description of the project, project status, and key results to date is included. (WHK)

  8. Ground-water quality assessment of the central Oklahoma Aquifer, Oklahoma; project description

    Science.gov (United States)

    Christenson, S.C.; Parkhurst, D.L.

    1987-01-01

    In April 1986, the U.S. Geological Survey began a pilot program to assess the quality of the Nation's surface-water and ground-water resources. The program, known as the National Water-Quality Assessment (NAWQA) program, is designed to acquire and interpret information about a variety of water-quality issues. The Central Oklahoma aquifer project is one of three ground-water pilot projects that have been started. The NAWQA program also incudes four surface-water pilot projects. The Central Oklahoma aquifer project, as part of the pilot NAWQA program, will develop and test methods for performing assessments of ground-water quality. The objectives of the Central Oklahoma aquifer assessment are: (1) To investigate regional ground-water quality throughout the aquifer in the manner consistent with the other pilot ground-water projects, emphasizing the occurrence and distribution of potentially toxic substances in ground water, including trace elements, organic compounds, and radioactive constituents; (2) to describe relations between ground-water quality, land use, hydrogeology, and other pertinent factors; and (3) to provide a general description of the location, nature, and possible causes of selected prevalent water-quality problems within the study unit; and (4) to describe the potential for water-quality degradation of ground-water zones within the study unit. The Central Oklahoma aquifer, which includes in descending order the Garber Sandstone and Wellington Formation, the Chase Group, the Council Grove Group, the Admire Group, and overlying alluvium and terrace deposits, underlies about 3,000 square miles of central Oklahoma and is used extensively for municipal, industrial, commercial, and domestic water supplies. The aquifer was selected for study by the NAWQA program because it is a major source for water supplies in central Oklahoma and because it has several known or suspected water-quality problems. Known problems include concentrations of arsenic, chromium

  9. Projections of Three-Dimensional Regions

    Science.gov (United States)

    Martinez, Felix; Rosa, De La

    2005-01-01

    When first-year calculus students are interested in studying double integrals, they can find, in standard textbooks, a detailed description of the different regions of integration. The aims of this paper are: to give a criterion to select the plane that will be projected, to classify the projections, and to give a simple rule to obtain them.…

  10. New York State Energy Research and Development Authority. Research projects` update project status as of March 31, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    This report provides an update of the New York State Energy Research and Development Authority (NYSERDA) program. The NYSERDA research and development program has five major areas: industry, buildings, energy resources, transportation, and environment. NYSERDA organizes projects within these five major areas based on energy use and supply, and end-use sectors. Therefore, issues such as waste management, energy products and renewable energy technologies are addressed in several areas of the program. The project descriptions presented are organized within the five program areas. Descriptions of projects completed between the period April 1, 1996, and March 31, 1997, including technology-transfer activities, are at the end of each subprogram section.

  11. 7 CFR 2903.7 - Project objectives.

    Science.gov (United States)

    2010-01-01

    ... AGRICULTURE BIODIESEL FUEL EDUCATION PROGRAM Program Description § 2903.7 Project objectives. (a) Successful... 7 Agriculture 15 2010-01-01 2010-01-01 false Project objectives. 2903.7 Section 2903.7 Agriculture... following objectives: (1) Enhance current efforts to collect and disseminate biodiesel information; (2...

  12. 2018 DOE Solid-State Lighting Project Portfolio

    Energy Technology Data Exchange (ETDEWEB)

    None

    2018-01-31

    The 2018 Solid-State Lighting Project Portfolio provides an overview of all SSL projects that have been funded by DOE since 2000. Projects that were active during 2017 are found in the main body of this report, and all historic projects can be found in the appendix. Within these sections, project profiles are sorted by technology type (i.e., LED or OLED) and then by performer name. A profile is provided on each project. Each profile includes a brief technical description, as well as information about project partners, funding, and the research period. This report is updated annually, although the research described in the Portfolio changes periodically as new projects are initiated and existing ones are concluded.

  13. Project Management in the Finnish Music Industry

    OpenAIRE

    Hypén, Joel

    2009-01-01

    The term project is a widely used phrase in today’s working life. This thesis explains what project management theory is, how it has evolved through history and how it is applied in managing modern business projects in the contexts of the Finnish music business sector. The literature review contains a description of the key phases a project is typically organised in as well as the terms and tools used to plan and run a successful project. Through qualitative research means the thesis inves...

  14. Salt Repository Project. FY-84 technical project plan

    International Nuclear Information System (INIS)

    1984-08-01

    The FY 84 technical plans for the Salt Repository Project (SRP) are briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management (CRWM) program are discused and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 Work Breakdown Structure Tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Test Facilities, Exploratory Shaft, Land Acquisition, and Program Management) in an appendix. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. Milestones and their definitions for the plan year, as well as milestones for the outyears are also presented at this same subtask level for each subtask

  15. Involvement of the US Department of Defense in Civilian Assistance, Part I: a quantitative description of the projects funded by the Overseas Humanitarian, Disaster, and Civic Aid Program.

    Science.gov (United States)

    Bourdeaux, Margaret Ellis; Lawry, Lynn; Bonventre, Eugene V; Burkle, Frederick M

    2010-03-01

    To review the history and goals of the US Department of Defense's largest civilian assistance program, the Overseas Humanitarian, Disaster and Civic Aid Program and to describe the number, geographic regions, years, key words, countries, and types of projects carried out under this program since 2001. Using the program's central database, we reviewed all approved projects since 2001 and tabulated them by year, combatant command, country, and key word. We also reviewed the project descriptions of projects funded between January 1, 2006, and February 9, 2008, and examined how their activities varied by combatant command and year. Of the 5395 projects in the database, 2097 were funded. Projects took place in more than 90 countries, with Southern, Pacific, and Africa Command hosting the greatest number. The most common types of projects were school, health, disaster response, and water infrastructure construction, and disaster-response training. The "global war on terror" was the key word most frequently tagged to project descriptions. Project descriptions lacked stated goals as well as implementation and coordination strategies with potential partners, and did not report outcome or impact indicators. The geographic reach of the program is vast and projects take place in a wide variety of public sectors. Yet their security and civilian assistance value remains unclear given the lack of stated project goals, implementation strategies, or measures of effectiveness. To facilitate transparency and policy discussion, we recommend project proposals include hypotheses as to how they will enhance US security, their relevance to the public sector they address, and outcome and impact indicators that can assess their value and effectiveness.

  16. Managing Challenges in a Multi Contractor Project

    Science.gov (United States)

    King, Ron

    2011-01-01

    The presentation provides a project description, describes the integrated product team, and review project challenges. The challenges include programmatic, technical, basic drop tests, heavy drop tests, C-17 envelope expansion, and Ares I-X.

  17. Description of WIMS Library Update Project (WLUP)

    International Nuclear Information System (INIS)

    Leszczynski, Francisco

    2002-01-01

    WIMS-D is one of the few reactor lattice codes that are in the public domain and therefore are available on non-commercial terms, for research and power nuclear reactor calculations. The main weakness of the WIMS-D package is its multi-group constants library, which is based on very old data. Relatively good performance of WIMS-D is attributed to a series of empirical adjustments to the multi-group data. However, the adjustments are not always justified by more accurate and recent experimental measurements. In view of the recently available new, or revised, evaluated nuclear data files it was felt that the performance of WIMS-D could be improved by updating its library. The WIMS-D Library Update Project (WLUP) was initiated in the early 1990's and finished in 2001. The International Atomic Energy Agency (IAEA) supported its co-ordination, but the project itself consisted of voluntary contributions from a large number of participants. In due course, several benchmarks for testing the library were identified and analyzed, the WIMSR module of the NJOY code system was upgraded, a detailed parametric study was performed to investigate the effects of various data processing input options on integral results and, the data processing methods for the main reactor materials were optimized. The final product, available on CD-ROM from NDS-IAEA includes: 69 and 172 group WIMSD libraries prepared from the selected evaluated data files, IAEA-TECDOC with detailed documentation, Processing inputs, Benchmark inputs and, the system of auxiliary codes developed under the project. (author)

  18. Information management for nuclear power stations: project description

    International Nuclear Information System (INIS)

    Halpin, D.W.

    1978-03-01

    A study of the information management structure required to support nuclear power plant construction was performed by a joint university-industry group under the sponsorship of the Department of Energy (DOE), formerly the Energy Research and Development Administration (ERDA). The purpose of this study was (1) to study methods for the control of information during the construction and start-up of nuclear power plants, and (2) identify those data elements intrinsic to nuclear power plants which must be maintained in a structured format for quick access and retrieval. Maintenance of the massive amount of data needed for control of a nuclear project during design, procurement, construction, start-up/testing, and operational phases requires a structuring which allows immediate update and retrieval based on a wide variety of access criteria. The objective of the research described has been to identify design concepts which support the development of an information control system responsive to these requirements. A conceptual design of a Management Information Data Base System which can meet the project control and information exchange needs of today's large nuclear power plant construction projects has been completed and an approach recommended for development and implementation of a complete operational system

  19. Management & Communication: Project Management Case Study

    CERN Multimedia

    Nathalie Dumeaux

    2004-01-01

    We are pleased to announce the recent launch of a new workshop on Project Management. This is designed for People with budgetary, scheduling and/or organizational responsibilities in a project or a sub-project. The objectives through a management case study specially suited to CERN are: to become familiar with modern management techniques in use for structuring, planning, scheduling, costing and progress monitoring of a project or a sub-project. to understand in-depth issues associated with Deliverable-oriented Project Management, Earned Value Management, Advanced Project Cost Engineering and Project Risk Management. The full description of this workshop can be found here. The next session will be held on 8 October 2004. If you are interested in this workshop, please contact Nathalie Dumeaux, email or 78144. Programme of Seminars October to December 2004 Situation : 21.09.2004 Séminaires bilingues Dates Jours Places disponibles Project Management Case study 8 October 1 oui Intr...

  20. Consortium for Offshore Aviation Research : description of current projects

    International Nuclear Information System (INIS)

    Anon.

    1998-01-01

    The five projects which are currently underway or being evaluated through the Consortium for Offshore Aviation Research (COAR) were described. The projects are: (1) the use of narrow-beam, high intensity searchlights as approach aids for helicopter landings on helidecks in low visibility conditions, (2) establishment of a precipitation and fog characterization facility forecasting, (3) use of ice-phobic materials for airframe anti-icing, (4) use of differential global positioning satellite systems for offshore operations, and (5) the development of a virtual reality head-up-display for the approach to the Hibernia helideck (or any other helideck) to facilitate low visibility landings. Seed funding for these projects has been provided by the European Space Agency. Additional support is being provided by Hibernia, Petro-Canada, Husky Oil and Chevron Oil Canada. Initiatives to increase the number of partners are underway. 1 fig

  1. Management Innovations in Higher Education: A Descriptive Study of Information Technology Managers' Perceptions Regarding the Use and Value of Project Management in Institutions of Higher Education

    Science.gov (United States)

    Durbin, Michael P.

    2013-01-01

    This study examined the perspectives of IT managers working in colleges and universities regarding their use of and value for project management. Descriptive and inferential analyses were used to understand individual innovativeness, innovation characteristics of project management, and the perceived use of and value for project management best…

  2. Naesliden project: FEM modelling strategies

    Energy Technology Data Exchange (ETDEWEB)

    Borg, T.

    1980-05-15

    A schematized description is given of the different stages in the project. The aim is to show the development of the project and the strategies which have been chosen. The four different stages in the project are treated from the following points of view: the reasons for the choice of material models; the determination of model properties; and the control of the calculated values. In the origin plan for the project it was stated to only use a joint element model. However, it was shown to be a reasonable strategy to use both a general linear elastic model and a geometric restricted model with joint elements. During the course of the Project's development stages, it was found that a reduction in the number of rock types could be made without loss of generality. A modified strategy is suggested based on more studies of the rock bahavior and less advanced calculations in the first stages of the project.

  3. Evaluation of rubber modified asphalt demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    As part of the Ontario Government's medium-term scrap tire management strategy, 11 rubber modified asphalt demonstration projects were funded or completed, with 13 additional projects from small to large (1,500-65,000 passenger tire equivalents) approved for the 1993 paving season. This report presents the results of an August to November 1993 study of the 11 demonstration projects. The evaluation included a description of the technology; technical review of the projects; economic analysis; review of the environmental literature; environmental review of the projects; comparison of the projects with similar ones in other jurisdictions; and recommendations. Detailed information on asphalt technology is included in an appendix.

  4. New development of the projected shell model and description of low-lying collective states in transitional nuclei

    International Nuclear Information System (INIS)

    Chen, F. Q.; Sun, Y.

    2013-01-01

    Description of the interplay between different nuclear shapes is an interesting but challenging problem. The original projected shell model (PSM) is applicable to nuclei with fixed shapes. We extend the PSM by superimposing (angular-momentum- and particle-number-) projected product wave functions in the spirit of the generate coordinate method. With this development, the Gd isotopes across the N = 90 region are studied, and the results indicate spectroscopic features of shape phase transition with varying neutron number. In order to illustrate the shape distribution in microscopic wave functions, we introduce a deformation representation and show that the collectively excited K π = 0 + states in the Gd isotopes have characters of shape vibration. (authors)

  5. Description of rotational excitations of odd nuclei by the method of projection

    International Nuclear Information System (INIS)

    Mazepus, V.V.

    1981-01-01

    We have carried out a projection on the angular-momentum operator eigenspace for deformed nuclei. The space of the trial wave functions is chosen to be broader than in the ordinary projection approach. It is shown that this method of projection leads to the particle + rotor model but not to the cranking model. A comparison is made with the method of approximate projection

  6. Projection of greenhouse gases 2014-2025

    DEFF Research Database (Denmark)

    Nielsen, Ole-Kenneth; Plejdrup, Marlene Schmidt; Winther, Morten

    This report contains a description of models, background data and projections of CO2, CH4, N2O, HFCs, PFCs and SF6 for Denmark. The emissions are projected to 2035 using a scenario combined with the expected results of a few individual policy measures. Official Danish forecasts of activity rates ...

  7. Projection of greenhouse gases 2011-2035

    DEFF Research Database (Denmark)

    Nielsen, Ole-Kenneth; Plejdrup, Marlene Schmidt; Winther, Morten

    This report contains a description of models, background data and projections of CO2, CH4, N2O, HFCs, PFCs and SF6 for Denmark. The emissions are projected to 2035 using a scenario combined with the expected results of a few individual policy measures. Official Danish forecasts of activity rates ...

  8. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-420. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance. This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  9. UMTRA Project-Level Cost Reduction/Productivity Improvement Program manual

    International Nuclear Information System (INIS)

    1995-06-01

    Mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project Cost Reduction/Productivity Improvement Program (CR/PIP) is to contribute to the UMTRA Project's environmental restoration mission by providing the means to achieve and recognize continuous improvements and cost savings. This manual includes program definition, description of UMTRA project organizational responsibilities and interfaces with existing project functions, guidance to contractors, and definition of project-level functions

  10. FINAL PROJECT REPORT - EVALUATION AND TESTING OF HTGR REACTOR BUILDING RESPONSE TO DEPRESSURIZATION ACCIDENTS

    Energy Technology Data Exchange (ETDEWEB)

    ALLIANCE LIMITED, NGNP INDUSTRY

    2017-07-25

    This report provides a description of the project, summarizes each phase of the project, and ends with project conclusions. In addition, the report contains a descriptive index of the technical reports generated during the course of the project.

  11. Projection of greenhouse gases 2016-2035

    DEFF Research Database (Denmark)

    Nielsen, Ole-Kenneth; Plejdrup, Marlene Schmidt; Winther, Morten

    2017-01-01

    The report contains a description of models, background data and projections of CO2, CH4, N2O, HFCs, PFCs and SF6 for Denmark. The emissions are projected to 2035 using a ‘with measures’ scenario. Official Danish forecasts of activity rates are used in the models for those sectors for which forec...

  12. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  13. 76 FR 56905 - The Central Valley Project, the California-Oregon Transmission Project, the Pacific Alternating...

    Science.gov (United States)

    2011-09-14

    ... Redding Electric Utility, California. Project Description A. History and Description of the CVP, PACI, and... Dams were also included in the authorization, along with high-voltage transmission lines designed to... three components: Component 1: [GRAPHIC] [TIFF OMITTED] TN14SE11.006 Where: FP Customer Load = An FP...

  14. An Operational ’Project Management Culture’ Framework (Part 1

    Directory of Open Access Journals (Sweden)

    Yvonne du Plessis

    2006-11-01

    Full Text Available The aim of this research is to develop an operational ‘project management culture’ framework, which can be used by project managers and organisations to support project work. One of the main causes of project failure is attributed to a non-supportive project management culture in organisations. A triangulation method is followed inclusive of a thorough literature review, a survey questionnaire and a concept mapping process. A project management culture framework with descriptive elements, based on Deal and Kennedy’s (1982 definition of organisational culture, comprising of four dimensions i.e. project process; people in projects; project systems and structure, and project environment was developed.

  15. Project Final Report: HPC-Colony II

    Energy Technology Data Exchange (ETDEWEB)

    Jones, Terry R [ORNL; Kale, Laxmikant V [University of Illinois, Urbana-Champaign; Moreira, Jose [IBM T. J. Watson Research Center

    2013-11-01

    This report recounts the HPC Colony II Project which was a computer science effort funded by DOE's Advanced Scientific Computing Research office. The project included researchers from ORNL, IBM, and the University of Illinois at Urbana-Champaign. The topic of the effort was adaptive system software for extreme scale parallel machines. A description of findings is included.

  16. Project CAREER/CAN. Final Evaluation Report.

    Science.gov (United States)

    National Educational Evaluation Services, Inc., Chestnut Hill, MA.

    A description and evaluation of (1) the development of the 4-column process which completes the behavioral objective data base, (2) the development of the computer retrieval capability, and (3) the pilot testing of the product in high school classrooms are included in this summative evaluation of Project CAREER/CAN. (Goals of Project CAREER/CAN,…

  17. Time Overrun in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Timely completion is the key criteria to achieve success in any project despite the industry. Unfortunately construction industry in Malaysia has been labelled as industry facing poor performance leading to failure in achieving effective time management. As the consequence most of the project face huge amount of time overrun. This study assesses the causes of construction projects time overrun in Malaysia using structured questionnaire survey. Each respondent is asked to assign a one-to-five rating for each of the 18 time factors identified from literature review. Out of the 50 questionnaires sent out, 33 were received back representing 68% of the response rate. Data received from the questionnaires were analysed and processed using the descriptive statistics procedures. Findings from the study revealed that design and documentation issues, project management and contract administration, ineffective project planning and scheduling, contractor’s site management, financial resource management were the major factors that cause the time overrun. This study is hoped to help the practitioners to implement the mitigation measure at planning stage in order to achieve successful construction projects.

  18. The ECLSS Advanced Automation Project Evolution and Technology Assessment

    Science.gov (United States)

    Dewberry, Brandon S.; Carnes, James R.; Lukefahr, Brenda D.; Rogers, John S.; Rochowiak, Daniel M.; Mckee, James W.; Benson, Brian L.

    1990-01-01

    Viewgraphs on Environmental Control and Life Support System (ECLSS) advanced automation project evolution and technology assessment are presented. Topics covered include: the ECLSS advanced automation project; automatic fault diagnosis of ECLSS subsystems descriptions; in-line, real-time chemical and microbial fluid analysis; and object-oriented, distributed chemical and microbial modeling of regenerative environmental control systems description.

  19. The Saskatchewan Environmental Assessment Act Guide to Proposal Development : oil and natural gas projects

    International Nuclear Information System (INIS)

    1999-02-01

    The manner in which requests for review of oil and natural gas projects are to be provided under the Environmental Assessment Act in Saskatchewan is described. The provisions of the Guide apply to all seismic projects on private or Crown lands, all drilling projects, flowline projects, access routes and production facilities on any land, except where the project is on cultivated land where it does not interfere with water bodies or endangered species. It also applies to any project that has the potential to meet the definition of 'development' under the Environmental Assessment Act. Basically, the following information is required for all proposals: (1) project description, (2) project evaluation, (3) description of proposed waste management practices, and (4) description of the proposed environmental monitoring. 4 refs

  20. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  1. How is success or failure in river restoration projects evaluated? Feedback from French restoration projects.

    Science.gov (United States)

    Morandi, Bertrand; Piégay, Hervé; Lamouroux, Nicolas; Vaudor, Lise

    2014-05-01

    Since the 1990s, French operational managers and scientists have been involved in the environmental restoration of rivers. The European Water Framework Directive (2000) highlights the need for feedback from restoration projects and for evidence-based evaluation of success. Based on 44 French pilot projects that included such an evaluation, the present study includes: 1) an introduction to restoration projects based on their general characteristics 2) a description of evaluation strategies and authorities in charge of their implementation, and 3) a focus on the evaluation of results and the links between these results and evaluation strategies. The results show that: 1) the quality of an evaluation strategy often remains too poor to understand well the link between a restoration project and ecological changes; 2) in many cases, the conclusions drawn are contradictory, making it difficult to determine the success or failure of a restoration project; and 3) the projects with the poorest evaluation strategies generally have the most positive conclusions about the effects of restoration. Recommendations are that evaluation strategies should be designed early in the project planning process and be based on clearly-defined objectives. Copyright © 2014 Elsevier Ltd. All rights reserved.

  2. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    : analysis of results of planning the project scope; study of templates of project works’ structures, recommendations for the formation of levels of structure; decomposition of the totality of project work; creating a dictionary of the project work structure; updating the description of the project scope and the project scope management plan. Practical importance. In order to improve the management of the scope of projects in the pharmacy, the components of subprocesses, participants, input and output documents are investigated and the algorithm for managing the project scope is built. It is determined that the starting elements of project scope management are the justification of the initial data, i.e. the project purpose, impacts of the environment and the internal potential of the enterprise in relation to the project implementation (assets of the organizational process. It is recommended to create a structure of project work starting from the analytical research existing at the enterprise or recommended by standards and guidelines on project management approaches to building a hierarchical structure of works, templates of project work structures. It is noted that the created structure of project work should be audited by participants of the project office. According to the results of planning the sequence and duration of operations for managing the scope of works, a precedence diagram of the investigated process is constructed. Value/originality. The developed recommendations regarding the consistency and structure of subprocesses and operations of the project scope management will allow the enterprise to significantly save time for planning the scope of subsequent projects, using the database created in previous periods, statistics on the implementation of the described operations.

  3. Site quality management of engineering projects

    International Nuclear Information System (INIS)

    Jiang Yiqun

    2008-01-01

    Site quality management of an engineering project of NPIC was introduced in this paper. Requirements on organization and management, interfaces, and management of interior and exterior communication were put forward, by description of quality planning, process management, process monitoring and summarizing for the engineering projects. By the management of personnel, specifications and procedures, and the control of equipment, material and work surroundings, not only the safety is ensured, but also the quality and schedule of the engineering project were guaranteed, and so the expected quality goals were achieved. (author)

  4. Inventory of current environmental monitoring projects in the US-Canadian transboundary region

    Energy Technology Data Exchange (ETDEWEB)

    Glantz, C.S.; Ballinger, M.Y.; Chapman, E.G.

    1986-05-01

    This document presents the results of a study commissioned to survey and summarize major environmental monitoring projects in the US-Canadian transboundary region. Projects with field sites located within 400 km (250 mi) of the border and active after 1980 were reviewed. The types of projects included: ambient air-quality monitoring, ambient water-quality monitoring, deposition monitoring, forest/vegetation monitoring and research, soil studies, and ecosystem studies. Ecosystem studies included projects involving the measurement of parameters from more than one monitoring category (e.g., studies that measured both water and soil chemistry). Individual descriptions were formulated for 184 projects meeting the spatial and temporal criteria. Descriptions included the official title for the project, its common abbreviation, program emphasis, monitoring site locations, time period conducted, parameters measured, protocols employed, frequency of sample collection, data storage information, and the principal contact for the project. A summary inventory subdivided according to the six monitoring categories was prepared using a computerized data management system. Information on major centralized data bases in the field of environmental monitoring was also obtained, and summary descriptions were prepared. The inventory and data base descriptions are presented in appendices to this document.

  5. Project report - an overview of the project and experiences with project management

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Mikkelsen, Bent Egberg

    1996-01-01

    A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project.......A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project....

  6. The Palmottu analogue project: overview for 1993

    International Nuclear Information System (INIS)

    Ruskeeniemi, T.; Blomqvist, R.; Suksi, J.; Niini, H.

    1994-01-01

    This article gives a summary of the activities carried out within the Palmottu analogue project in 1993. It consists of (1) an introductory part, followed by (2) a geological description of the site, and (3)an up-to-date summary of the results of the project. (orig.) (33 refs., 6 figs.)

  7. Application of PRINCE2 Project Management Methodology

    Directory of Open Access Journals (Sweden)

    Vaníčková Radka

    2017-09-01

    Full Text Available The methodology describes the principle of setting a project in PRINCE2 project management. The main aim of the paper is to implement PRINCE2 methodology to be used in an enterprise in the service industry. A partial aim is to choose a supplier of the project among new travel guides. The result of the project activity is a sight-seeing tour/service more attractive for customers in the tourism industry and a possible choice of new job opportunities. The added value of the article is the description of applying the principles, processes and topics of PRINCE2 project management so that they might be used in the field.

  8. Environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    Guidelines are presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec. The statement must include a project justification, description of the biophysical and social environments, a project description, and must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Appendices include a memorandum of understanding, list of members of the review bodies, list of briefs submitted at the public scoping hearings, and a list of public comments on the draft guidelines. 17 figs

  9. Global Land Survey Impervious Mapping Project Web Site

    Science.gov (United States)

    DeColstoun, Eric Brown; Phillips, Jacqueline

    2014-01-01

    The Global Land Survey Impervious Mapping Project (GLS-IMP) aims to produce the first global maps of impervious cover at the 30m spatial resolution of Landsat. The project uses Global Land Survey (GLS) Landsat data as its base but incorporates training data generated from very high resolution commercial satellite data and using a Hierarchical segmentation program called Hseg. The web site contains general project information, a high level description of the science, examples of input and output data, as well as links to other relevant projects.

  10. Project Termination Report. Title IV-C Classroom Management Project. ESEA Title IV-C, August 29, 1981 - September 30, 1982.

    Science.gov (United States)

    Halasa, Ofelia; Theus, Frank

    This report provides a summary description of the Title IV-C Classroom Management Project conducted in the Cleveland (Ohio) Public Schools. The purpose of this project was to develop and pilot test a resource handbook designed to improve elementary and secondary school teachers' ability to organize and manage their classrooms. The development of…

  11. K3 projective models in scrolls

    CERN Document Server

    Johnsen, Trygve

    2004-01-01

    The exposition studies projective models of K3 surfaces whose hyperplane sections are non-Clifford general curves. These models are contained in rational normal scrolls. The exposition supplements standard descriptions of models of general K3 surfaces in projective spaces of low dimension, and leads to a classification of K3 surfaces in projective spaces of dimension at most 10. The authors bring further the ideas in Saint-Donat's classical article from 1974, lifting results from canonical curves to K3 surfaces and incorporating much of the Brill-Noether theory of curves and theory of syzygies developed in the mean time.

  12. Project management: importance for diagnostic laboratories.

    Science.gov (United States)

    Croxatto, A; Greub, G

    2017-07-01

    The need for diagnostic laboratories to improve both quality and productivity alongside personnel shortages incite laboratory managers to constantly optimize laboratory workflows, organization, and technology. These continuous modifications of the laboratories should be conducted using efficient project and change management approaches to maximize the opportunities for successful completion of the project. This review aims at presenting a general overview of project management with an emphasis on selected critical aspects. Conventional project management tools and models, such as HERMES, described in the literature, associated personal experience, and educational courses on management have been used to illustrate this review. This review presents general guidelines of project management and highlights their importance for microbiology diagnostic laboratories. As an example, some critical aspects of project management will be illustrated with a project of automation, as experienced at the laboratories of bacteriology and hygiene of the University Hospital of Lausanne. It is important to define clearly beforehand the objective of a project, its perimeter, its costs, and its time frame including precise duration estimates of each step. Then, a project management plan including explanations and descriptions on how to manage, execute, and control the project is necessary to continuously monitor the progression of a project to achieve its defined goals. Moreover, a thorough risk analysis with contingency and mitigation measures should be performed at each phase of a project to minimize the impact of project failures. The increasing complexities of modern laboratories mean clinical microbiologists must use several management tools including project and change management to improve the outcome of major projects and activities. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  13. One project`s waste is another project`s resource

    Energy Technology Data Exchange (ETDEWEB)

    Short, J.

    1997-02-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables.

  14. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  15. Vague project start makes project success of outsourced software development projects uncertain

    OpenAIRE

    Savolainen, Paula

    2010-01-01

    peer-reviewed A definition of a project success includes at least three criteria: 1) meeting planning goals, 2) customer benefits, and 3) supplier benefits. This study aims to point out the importance of the definition of the project start, the project start date, and what work should be included in the project effort in order to ensure the supplier's benefits. The ambiguity of the project start risks the profitability of the project and therefore makes project success at least from suppli...

  16. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  17. Decontamination and dismantlement of the JANUS Reactor at Argonne National Laboratory-East. Project final report

    International Nuclear Information System (INIS)

    Fellhauer, C.R.; Clark, F.R.

    1997-10-01

    The decontamination and dismantlement of the JANUS Reactor at Argonne National Laboratory-East (ANL-E) was completed in October 1997. Descriptions and evaluations of the activities performed and analyses of the results obtained during the JANUS D and D Project are provided in this Final Report. The following information is included: objective of the JANUS D and D Project; history of the JANUS Reactor facility; description of the ANL-E site and the JANUS Reactor facility; overview of the D and D activities performed; description of the project planning and engineering; description of the D and D operations; summary of the final status of the JANUS Reactor facility based upon the final survey results; description of the health and safety aspects of the project, including personnel exposure and OSHA reporting; summary of the waste minimization techniques utilized and total waste generated by the project; and summary of the final cost and schedule for the JANUS D and D Project

  18. Nuclear Safety Project. Annual report 1983

    International Nuclear Information System (INIS)

    1984-06-01

    The annual report 1983 is a detailed description (in German language) of work within the Nuclear Safety Project performed in 1983 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes for each individual research activity short summaries in English language on work performed, results obtained and plans for future work. This report was compiled by the project management. (orig.) [de

  19. Nuclear safety project. Annual report 1985

    International Nuclear Information System (INIS)

    1986-07-01

    The annual report 1985 is a detailed description (in German language) of work within the nuclear safety project performed in 1985 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes for each individual research activity short summaries in English language on work performed, results obtained and plans for future work. This report was compiled by the project management. (orig./HP) [de

  20. Problem-based and project-oriented learning

    DEFF Research Database (Denmark)

    Blaabjerg, Frede; Teodorescu, Remus; Chen, Zhe

    2005-01-01

    . Generally, the content of the curriculum should be more expanded without extra study time. This paper presents a teaching approach, which makes it possible very fast for the students to obtain in-depth skills into new research areas, and this method is the problem-oriented and project-based learning....... In this paper the necessary skills for power electronic engineers are outlined that is followed up by a description on how the problem-oriented and project-based learning are implemented. A complete curriculum in power electronics and drives at Aalborg University is presented where different power electronics...... related projects at different study levels also are presented....

  1. A maturation model for project-based organisations – with uncertainty management as an always remaining multi-project management focus

    Directory of Open Access Journals (Sweden)

    Anna Jerbrant

    2014-02-01

    Full Text Available The classical view of multi-project management does not capture its dynamic nature. Present theory falls short in the expositive dimension of how management of project-based companies evolves because of their need to be agile and adaptable to a changing environment. The purpose of this paper is therefore to present a descriptive model that elucidates the maturation processes in a project-based organization as well as to give an enhanced understanding of multi-project management in practice. The maturation model displays how the management of project-based organizations evolves between structuring administration and managing any uncertainty, and emphasizes the importance of active individual actions and situated management actions that haveto be undertaken in order to coordinate, synchronize, and communicate the required knowledge and skills.The outcomes primarily reveal that, although standardized project models are used and considerable resources are spent on effective project portfolio management, how information and communication are executedis essential for the management of project-based organizations. This is particularly true for informal and non-codified communication.

  2. Design methodology and projects for space engineering

    Science.gov (United States)

    Nichols, S.; Kleespies, H.; Wood, K.; Crawford, R.

    1993-01-01

    NASA/USRA is an ongoing sponsor of space design projects in the senior design course of the Mechanical Engineering Department at The University of Texas at Austin. This paper describes the UT senior design sequence, consisting of a design methodology course and a capstone design course. The philosophical basis of this sequence is briefly summarized. A history of the Department's activities in the Advanced Design Program is then presented. The paper concludes with a description of the projects completed during the 1991-92 academic year and the ongoing projects for the Fall 1992 semester.

  3. COMPUTER GRAPHICAL REPRESENTATION, IN TREBLE ORTHOGONAL PROJECTION, OF A POINT

    Directory of Open Access Journals (Sweden)

    SLONOVSCHI Andrei

    2017-05-01

    Full Text Available In the stages of understanding and study, by students, of descriptive geometry, the treble orthogonal projection of a point, creates problems in the situations in that one or more descriptive coordinates are zero. Starting from these considerations the authors have created an original computer program which offers to the students the possibility to easily understanding of the way in which a point is represented, in draught, in the treble orthogonal projection whatever which are its values of the descriptive coordinates.

  4. Credit. 1991-92 NCCE/AT&T Projects. Consumer Education Programs.

    Science.gov (United States)

    Eastern Michigan Univ., Ypsilanti. National Inst. for Consumer Education.

    Summaries are provided of 37 projects that address the credit education and information needs of consumers. The projects are supported by AT&T Universal Card Services Corp. through a fund managed by the National Coalition for Consumer Education. Each summary provides a project description, grant recipient, and address/telephone number. The…

  5. Project W-211 Initial Tank Retrieval Systems (ITRS) Description of Operations for 241-AZ-102

    Energy Technology Data Exchange (ETDEWEB)

    BRIGGS, S.R.

    2000-02-25

    The primary purpose of the Initial Tank Retrieval Systems (ITRS) is to provide systems for retrieval of radioactive wastes stored in underground double-shell tanks (DSTs) for transfer to alternate storage, evaporation, pretreatment or treatment, while concurrently reducing risks associated with safety watch list and other DSTs. This Description of Operation (DOO) defines the control philosophy for the waste retrieval system for Tank 241-AZ-102 (AZ-102). This DOO provides a basis for the detailed design of the Project W-211 Retrieval Control System (RCS) for AZ-102 and also establishes test criteria for the RCS.

  6. Project W-211 Initial Tank Retrieval Systems (ITRS) Description of Operations for 241-AZ-102

    International Nuclear Information System (INIS)

    BRIGGS, S.R.

    2000-01-01

    The primary purpose of the Initial Tank Retrieval Systems (ITRS) is to provide systems for retrieval of radioactive wastes stored in underground double-shell tanks (DSTs) for transfer to alternate storage, evaporation, pretreatment or treatment, while concurrently reducing risks associated with safety watch list and other DSTs. This Description of Operation (DOO) defines the control philosophy for the waste retrieval system for Tank 241-AZ-102 (AZ-102). This DOO provides a basis for the detailed design of the Project W-211 Retrieval Control System (RCS) for AZ-102 and also establishes test criteria for the RCS

  7. Nuclear Safety Project

    International Nuclear Information System (INIS)

    1978-11-01

    The 13th semi-annual report 1/78 is a description of work within the Nuclear Safety Project performed in the first six months of 1978 in the nuclear safety field by KFK institutes and departments and by external institutions on behalf of KfK. It includes for each individual research activity short summaries on - work completed, - essential results, - plans for the near future. (orig./RW) [de

  8. TWENTY-ONE-YEAR EXTENSION PROJECT PERFORMANCE "LET'S BREASTFEEDING, MOMMY?"

    Directory of Open Access Journals (Sweden)

    Marizete Argolo Teixeira

    2017-05-01

    Full Text Available Research aiming to describe the actions that were developed by the Extension Project "Let's breastfeed, Mom?" During the 21 years of its performance in Jequié / Bahia and identify the difficulties, facilities and progress of the project. This is a descriptive, quantitative-qualitative study. The data were collected in the archived project documents, analyzed through descriptive statistics and content analysis. The results showed that 8,923 registered postpartum women with educational activities and 1,313 domiciliary visits were carried out, as the main actions carried out by the project. The difficulties were: lack of consumer / permanent materials and human resources; As facilities: responsibility and commitment of the members of the project, as well as the support of the transportation service of the institution. The advances were the elaboration of the research project, with insertion of research fellows, creation of the webpage and the logo. It is necessary to reflect on the difficulties and propose measures to remedy them and thus continue to contribute to the promotion, protection and support of breastfeeding in the Municipality, contributing to the reduction of infant morbidity and mortality

  9. Managing project complexity : A study into adapting early project phases to improve project performance in large engineering projects

    NARCIS (Netherlands)

    Bosch-Rekveldt, M.G.C.

    2011-01-01

    Engineering projects become increasingly more complex and project complexity is assumed to be one of the causes for projects being delivered late and over budget. However, what this project complexity actually comprised of was unclear. To improve the overall project performance, this study focuses

  10. Quality assurance program plan fuel supply shutdown project

    International Nuclear Information System (INIS)

    Metcalf, I.L.

    1998-01-01

    This Quality Assurance Program plan (QAPP) describes how the Fuel Supply Shutdown (FSS) project organization implements the quality assurance requirements of HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) and the B and W Hanford Company Quality Assurance Program Plan (QAPP), FSP-MP-004. The QAPP applies to facility structures, systems, and components and to activities (e.g., design, procurement, testing, operations, maintenance, etc.) that could affect structures, systems, and components. This QAPP also provides a roadmap of applicable Project Hanford Policies and Procedures (PHPP) which may be utilized by the FSS project organization to implement the requirements of this QAPP

  11. Project Specific Quality Assurance Plan Project (QAPP) W-211 Initial Tank Retrieval Systems (ITRS)

    International Nuclear Information System (INIS)

    HALL, L.R.

    2000-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Project Hanford Quality Assurance Program is implemented by CH2M HILL Hanford Group Inc (CHG) for managing the Initial Tank Retrieval Systems (ITRS), Project W-211. This QAPP is responsive to the CHG Quality Assurance Program Description (QAPD) (LMH-MP-599) which provides direction for compliance to 10 CFR 830 120, ''Nuclear Safety Management, Quality Assurance Requirements'', and DOE Order 5700 6C, ''Quality Assurance'' Project W-211 modifies existing facilities and provides systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for future processing plants, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. This project includes the design, procurement, construction, startup and turnover of these retrieval systems This QAPP identifies organizational structures and responsibilities. Implementing procedures used by CHG project management can be found in the CHG Quality Assurance Program (CHG QAP) Implementation Matrix located in HNF-IP-0842, Volume XI, Attachment Proposed verification and inspection activities for critical items within the scope of project W-211 are identified in Attachment 1 W-211. Project participants will identify the implementing procedures used by their organization within their QAF'Ps. This project specific QAPP is used to identify requirements in addition to the QAPD and provide, by reference, additional information to other project documents

  12. Itataia project - Development of the process

    International Nuclear Information System (INIS)

    Coelho, S.V.

    1987-01-01

    A process for treating the phosphorus uraniferous ore, from Itataia-CE mine in Brazil, was developed, establishing the basic flow chart for recovery two products: uranium concentrate and phosphoric acid. The developed process consists in physical concentration, chemical separation, solvent extraction, and it presented, in laboratory and pilot scales, recovery levels which assure the project viability technicaly and economicaly. The consolidation of project and the description of installations are presented by a documentary film. (M.C.K.) [pt

  13. Itataia project - Development of the process

    International Nuclear Information System (INIS)

    Coelho, S.V.

    1987-01-01

    A process for treating the phosphorous uraniferous ore, from Itataia-CE mine in Brazil, was developed, establishing the basic flow chart for recovery two products: uranium concentrate and phosphoric acid. The developed process consists in physical concentration, chemical separation, solvent extraction, and it presented, in laboratory and pilot scales, recovery leves which assure the project viability technically and economically. The consolidation of project and the description of installations are presented by a documentary film. (M.C.K.) [pt

  14. Projection of greenhouse gas emissions 2007 to 2025

    DEFF Research Database (Denmark)

    Nielsen, Ole-Kenneth; Winther, Morten; Mikkelsen, Mette Hjorth

    This report contains a description of models and background data for projection of CO2, CH4, N2O, HFCs, PFCs and SF6 for Denmark. The emissions are projected to 2025 using basic scenarios together with the expected results of a few individual policy measures. Official Danish forecasts of activity...

  15. Projection of Greenhouse Gas Emissions 2009 to 2030

    DEFF Research Database (Denmark)

    Nielsen, Ole-Kenneth; Winther, Morten; Mikkelsen, Mette Hjorth

    This report contains a description of models, background data and projections of CO2, CH4, N2O, HFCs, PFCs and SF6 for Denmark. The emissions are projected to 2030 using basic scenarios together with the expected results of a few individual policy measures. Official Danish forecasts of activity r...

  16. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  17. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    Full Text Available Modern management theory treats all complex tasks and duties like projects and make these projects possible to be managed by a particular organizational-management concept in order to achieve a goal effectively. A large number of jobs and tasks performed in the system of defense or for defense purposes have the characteristics of projects. Project management is both a skill and a science of monitoring human, material, financial, energy and other resources to achieve required objectives within the given limits: deadlines, time, budget, possibility of realization and the satisfaction of the interests of all project participants. Project management is a traditional area of applied (or functional management focused on managing complex and uncertain situations with defined goals. Introduction In conditions of rapid change and high uncertainty, only adaptive organizations survive, i. e. those that are able not only to react quickly to changes but also to proactively take advantage of changes. Development of project management The biggest influence on the development of the area had complex jobs within the engineering profession. In parallel with the traditional approach new approaches began to develop, while the traditional one still remained in use. Contrary to the traditional engineering approach, a dynamic model first developed in order to respond to demands for greater control of costs. Project management Project management is a skill and knowledge of human and material resources to achieve set objectives within prescribed limits: deadlines, time, budget, possibility of realization, and the satisfaction of all participants in the project. In order to realize a project effectively, it is necessary to manage it rationally. Planning and project management A project plan is a document that allows all team members insight on where to go, when to start and when to arrive, what is necessary to be done in order to achieve the project objectives and what

  18. Project Management Plan for Material Stabilization

    International Nuclear Information System (INIS)

    SPEER, D.R.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617/Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides

  19. Projection of Greenhouse Gas Emissions 2010 to 2030

    DEFF Research Database (Denmark)

    Nielsen, Ole-Kenneth; Winther, Morten; Nielsen, Malene

    This report contains a description of models, background data and projections of CO2, CH4, N2O, HFCs, PFCs and SF6 for Denmark. The emissions are projected to 2030 using a scenario combined with the expected results of a few individual policy measures. Official Danish forecasts of activity rates ...... on emission data from a considerable number of industrial plants. The projection models are based on the same structure and method as the Danish emission inventories in order to ensure consistency....

  20. Vitrification facility at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    DesCamp, V.A.; McMahon, C.L.

    1996-07-01

    This report is a description of the West Valley Demonstration Project's vitrification facilities from the establishment of the West Valley, NY site as a federal and state cooperative project to the completion of all activities necessary to begin solidification of radioactive waste into glass by vitrification. Topics discussed in this report include the Project's background, high-level radioactive waste consolidation, vitrification process and component testing, facilities design and construction, waste/glass recipe development, integrated facility testing, and readiness activities for radioactive waste processing

  1. Project Design Concept - Primary Ventilation System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    Tank Farm Restoration and Safe Operation (TFRSO), Project W-3 14 was established to provide upgrades that would improve the reliability and extend the system life of portions of the waste transfer, electrical, ventilation, instrumentation and control systems for the Hanford Site Tank Farms. An assessment of the tank farm system was conducted and the results are documented in system assessment reports. Based on the deficiencies identified in the tank farm system assessment reports, and additional requirements analysis performed in support of the River Protection Project (RPP), an approved scope for the TFRSO effort was developed and documented in the Upgrade Scope Summary Report (USSR), WHC-SD-W314-RPT-003, Rev. 4. The USSR establishes the need for the upgrades and identifies the specific equipment to be addressed by this project. This Project Design Concept (PDC) is in support of the Phase 2 upgrades and provides an overall description of the operations concept for the W-314 Primary Ventilation Systems. Actual specifications, test requirements, and procedures are not included in this PDC. The PDC is a ''living'' document, which will be updated throughout the design development process to provide a progressively more detailed description of the W-314 Primary Ventilation Systems design. The Phase 2 upgrades to the Primary Ventilation Systems shall ensure that the applicable current requirements are met for: Regulatory Compliance; Safety; Mission Requirements; Reliability; and Operational Requirements

  2. Nuclear Safety Project

    International Nuclear Information System (INIS)

    1983-12-01

    The semiannual progress report 1983/1 is a description of work within the Nuclear Safety Project performed in the first six month of 1983 in the nuclear safety field by KfK institutes and departments and by external institutions on behalf of KfK. The chosen kind of this report is that of short summaries, containing the topics work performed, results obtained and plans for future work. (orig./RW) [de

  3. Nuclear safety project

    International Nuclear Information System (INIS)

    Anon.

    1980-11-01

    The 17th semi-annual report 1980/1 is a description of work within the Nuclear Safety Project performed in the first six months of 1980 in the nuclear safety field by KfK institutes and departments and by external institutions on behalf of KfK. The chosen kind of this report is that of short summaries, containing the topics - work performed, results obtained, plans for future work. (orig.) [de

  4. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  5. Framework for Project Development in the Renewable Energy Sector

    Energy Technology Data Exchange (ETDEWEB)

    Springer, R.

    2013-02-01

    The concepts, descriptions, diagrams, and acronyms developed and described herein are meant to provide a contextual framework as well as a systematic, repeatable process to assist a potential project sponsor in understanding and navigating early-stage project development. Professional project developers will recognize these concepts and hold them as intuitive and even obvious, though the fundamentals of this specialized field are rarely written down and defined as they are here.

  6. Exploratory Shaft, Phase 1, Project B-314: Title 1 design report system design description

    International Nuclear Information System (INIS)

    Hanlen, D.F.

    1983-01-01

    The report describes the project and the project systems, the principal design bases, and principal hazards and project interfaces. This report also contains the Title 1 Estimate Summary. 5 figs., 8 tabs

  7. Olympic Dam project: assessment of the environmental impact

    International Nuclear Information System (INIS)

    1983-11-01

    The assessment report on the Environmental Impact Statement produced for the Olympic Dam project is intended to provide the South Australian Government with a comprehensive evaluation of the potential impact of the proposal and to make recommendations concerning the project to be negotiated with the Joint Venturers prior to approval of the EIS. The project involves the mining, processing and sale of products from the copper-uranium ore body at Olympic Dam on the Roxby Downs Station, South Australia. The report includes a description of the proposal, a description of the environment likely to be affected, a discussion of the potential impacts on that environment, a discussion of the adequacy of information presented in the EIS and a discussion of the acceptability of the environmental impacts. The Department has concluded that the pre-design proposal is acceptable on environmental grounds

  8. A review of the possible future HEP Accelerator Projects

    CERN Multimedia

    CERN. Geneva

    2010-01-01

    The review, as already invited for presentation at the recent International Conference on High Energy Physics (ICHEP2010), covers all accelerator projects presently envisaged for HEP in the near and mid-term future. After a brief description of the major motivation, issues and necessary R&D of each project, it specially emphasizes the synergies between the different projects and their R&D issues, pointing out their complementarities and the efficient collaborative approach to address them. It finally summarizes the relative schedule of the various projects in their different phases, pointing out their global interdependence.

  9. Groundwater flow simulations in support of the Local Scale Hydrogeological Description developed within the Laxemar Methodology Test Project

    International Nuclear Information System (INIS)

    Follin, Sven; Svensson, Urban

    2002-05-01

    The deduced Site Descriptive Model of the Laxemar area has been parameterised from a hydraulic point of view and subsequently put into practice in terms of a numerical flow model. The intention of the subproject has been to explore the adaptation of a numerical flow model to site-specific surface and borehole data, and to identify potential needs for development and improvement in the planned modelling methodology and tools. The experiences made during this process and the outcome of the simulations have been presented to the methodology test project group in course of the project. The discussion and conclusions made in this particular report concern two issues mainly, (i) the use of numerical simulations as a means of gaining creditability, e.g. discrimination between alternative geological models, and (ii) calibration and conditioning of probabilistic (Monte Carlo) realisations

  10. Regulatory research and support program for 1993/1994 - project descriptions

    International Nuclear Information System (INIS)

    1993-01-01

    The Regulatory Research and Support Program (RSP) is intended to augment and extend the Atomic Energy Control Board's regulatory program beyond the capability of in-house resources. The overall objective of the research and support program is to produce pertinent and independent information that will assist the Board and its staff in making sound, timely and credible decisions on regulating nuclear facilities and materials. The program is divided into nine main areas of research (mission objects) covering the safety of nuclear facilities, radioactive waste management, health physics, physical security, the development of regulatory processes, and special services. In addition, for the first time in this year's program, sub-programs (collections of related projects) have been organized in some areas of study; these sub-programs may cut across several mission objects. More sub-programs will be introduced in future years. A total of 96 projects are planned for 1993/94, including a number which are ongoing from the previous fiscal year. Projects that are held in reserve in case funding becomes available are also listed and provisionally ranked. The spending estimates for the RSP were calculated on the basis of an expected budget of $3.85 M

  11. Regulatory research and support program for 1993/1994 - project descriptions

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-03-01

    The Regulatory Research and Support Program (RSP) is intended to augment and extend the Atomic Energy Control Board`s regulatory program beyond the capability of in-house resources. The overall objective of the research and support program is to produce pertinent and independent information that will assist the Board and its staff in making sound, timely and credible decisions on regulating nuclear facilities and materials. The program is divided into nine main areas of research (mission objects) covering the safety of nuclear facilities, radioactive waste management, health physics, physical security, the development of regulatory processes, and special services. In addition, for the first time in this year`s program, sub-programs (collections of related projects) have been organized in some areas of study; these sub-programs may cut across several mission objects. More sub-programs will be introduced in future years. A total of 96 projects are planned for 1993/94, including a number which are ongoing from the previous fiscal year. Projects that are held in reserve in case funding becomes available are also listed and provisionally ranked. The spending estimates for the RSP were calculated on the basis of an expected budget of $3.85 M.

  12. World Energy Projection System model documentation

    International Nuclear Information System (INIS)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA

  13. World Energy Projection System model documentation

    Energy Technology Data Exchange (ETDEWEB)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA.

  14. FY-1981 project status for the Transuranic Waste Treatment Facility

    International Nuclear Information System (INIS)

    Benedetti, R.L.; Tait, T.D.

    1981-11-01

    The primary objective of the Transuranic Waste Treatment Facility (TWTF) Project is to provide a facility to process low-level transuranic waste stored at the Idaho National Engineering Laboratory (INEL) into a form acceptable for disposal at the Waste Isolation Pilot Plant. This report provides brief summary descriptions of the project objectives and background, project status through FY-1981, planned activities for FY-1982, and the EG and G TWTF Project office position on processing INEL transuranic waste

  15. Impact of Project Leadership Facets on Project Outcome

    Directory of Open Access Journals (Sweden)

    Arslan Ayub

    2015-08-01

    Full Text Available The study analyzes the role of project leadership facets on effective project outcome. Numerous such initiatives have already been taken on project outcome/performance in the context of apposite leadership styles or project management. However, the current study is unique in the milieu of project outcome that it introduces a new leadership approach, which throws light on the significance of variant leadership facets on project outcome. The study uses explanatory approach; primary data is collected from project management professionals working in different project organizations. The study uses structural equation model (SEM technique to test the hypothesis. The study found a positive relationship between project leadership facets and project outcome.

  16. First-of-A-Kind Control Room Modernization Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Kenneth David [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-02-01

    This project plan describes a comprehensive approach to the design of an end-state concept for a modernized control room for Palo Verde. It describes the collaboration arrangement between the DOE LWRS Program Control Room Modernization Project and the APS Palo Verde Nuclear Generating Station. It further describes the role of other collaborators, including the Institute for Energy Technology (IFE) and the Electric Power Research Institute (EPRI). It combines advanced tools, methodologies, and facilities to enable a science-based approach to the validation of applicable engineering and human factors principles for nuclear plant control rooms. It addresses the required project results and documentation to demonstrate compliance with regulatory requirements. It describes the project tasks that will be conducted in the project, and the deliverable reports that will be developed through these tasks. This project plan will be updated as new tasks are added and as project milestones are completed. It will serve as an ongoing description on the project both for project participants and for industry stakeholders.

  17. OECD Halden Reactor Project

    International Nuclear Information System (INIS)

    1983-01-01

    The OECD Halden Reactor Project is both the oldest and the only one still in operation of the three major joint undertakings established at the inception of the OECD Nuclear Energy Agency. This publication has been printed in connection with its twenty-fifth anniversary as an international project. After presentation of the history and organization of the project, a thorough description of the past and present activities in the field of fuel performance and process control and surveillance is given. The projects's fuel testing programme is now focuessed on an investigation to define safety margins under normal operations as well as under various kinds of accident situations. Fuel research is also concerned with the characterisation of long term effects with regard to efficiency, operational safety and mapping of reliability and durability in the case of accidents with loss of coolant. In the field of process control and surveillance, research work is directly linked to the use of computers and colour graphics as tools in the control room. A fullscale simulator-based model and experimental control room has been constructed. The first experiments to be carried out in this laboratory will investigate the advantage of analysing alarms before they are presented to the operator. (RF)

  18. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  19. GRI baseline projection of U.S. Energy supply and demand to 2010. 1991 edition

    International Nuclear Information System (INIS)

    Holtberg, P.D.; Woods, T.J.; Lihn, M.L.; McCabe, N.C.

    1991-04-01

    The report summarizes the 1991 Edition of the GRI Baseline Projection of U.S. Energy Supply and Demand and presents a series of summary tables, sectoral breakdowns of energy demand, and the natural gas supply and price trends. Appendixes include a discussion of the methodology and assumptions used to prepare the 1991 projection, a brief discussion of the potential for higher levels of gas demand, a description of industrial and commercial cogeneration, a description of the independent power producer (IPP) methodology and projection, a comparison of the 1991 edition with previous projections, and a discussion of additional data used in developing the projection

  20. Project management in practice : Evaluating a case project through project management theories

    OpenAIRE

    Uusitalo, Jenni

    2013-01-01

    The purpose of this thesis was to evaluate a case project and to study whether it was carried out in a correct manner; meaning that did the case project follow the project management models. In addition, part of the study was to determine what could have been improved in the management of the case project. The case project was about creating and launching a communication channel based on a social media service, on a blog platform called Tumblr, for Team Finland in Spain network. The network p...

  1. The Healy clean coal project: An overview

    Energy Technology Data Exchange (ETDEWEB)

    Olson, J.B.; McCrohan, D.V. [Alaska Industrial Development and Export Authority, Anchorage, AK (United States)

    1997-12-31

    The Healy Clean Coal Project, selected by the US Department of Energy under Round III of the Clean Coal Technology Program is currently in construction. The project is owned and financed by the Alaska Industrial Development and Export Authority (AIDEA), and is cofunded by the US Department of Energy. Construction is scheduled to be completed in August of 1997, with startup activity concluding in December of 1997. Demonstration, testing and reporting of the results will take place in 1998, followed by commercial operation of the facility. The emission levels of NOx, SO{sub 2} and particulates from this 50 megawatt plant are expected to be significantly lower than current standards. The project status, its participants, a description of the technology to be demonstrated, and the operational and performance goals of this project are presented.

  2. Draft guidelines for the environmental impact study of the Great-Whale hydroelectric project

    International Nuclear Information System (INIS)

    1992-01-01

    The draft guidelines on the preparation of Hydro-Quebec's environmental and social impact statement for the proposed Great Whale River hydroelectric project are detailed. The guidelines cover project justification, description of the biophysical and social environments, project description, impacts of the project, mitigative measures, residual impacts and compensatory measures, environmental monitoring and follow-up programs. The proponent is asked to provide the justification for the project, including its general rationale, and to evaluate the long-term impact of the project. In justifying the project, the proponent should present energy demand and supply scenarios in sufficient detail to demonstrate the need for the project within the context of sustainable development. Long term impacts on the ecosystems of James Bay and Hudson Bay must be examined, as well as broad ecosystemic impacts such as those on the boreal forest, the tundra, as well as such considerations as global warming and changes in biological and cultural diversity

  3. National inventory of selected biological monitoring programs. Summary report of current or recently completed projects, 1976

    Energy Technology Data Exchange (ETDEWEB)

    Kemp, H. T.

    1976-10-01

    The Inventory has resulted in establishment of a series of data bases containing biological monitoring information of varying types, namely, directory of investigators, record of projects received from mail questionnaire, detailed description of selected biomonitoring projects, and bibliographic citations supporting the projects received. This report contains detailed descriptions of selected biomonitoring projects organized on a state-by-state basis and with appropriate indices.

  4. The Language Development Project; A Pilot Study in Language Learning. A New York State Urban Aid Project. End-Year Report, June 30, 1969.

    Science.gov (United States)

    New York City Board of Education, Brooklyn, NY.

    The format of this report is similar to that of other reports on The Language Development Project. See AL 002 352 and 354 for descriptions of the project and the format of the reports. [Not available in hard copy due to marginal legibility of the original document.] (DO)

  5. Description of the moderator systems for the ESS project

    International Nuclear Information System (INIS)

    Stendal, K.

    1996-10-01

    This paper describes a suggestion for the arrangement of the Cold Neutron Sources for the two targets in the ESS project. (European Spallation Source). The suggestion is based upon the technique of the existing cold neutron sources at Risoe in Denmark, HMI and Geestacht in Germany. As moderating media all of them use H 2 in supercritical condition, circulated by blowers, and the safety of the systems is based upon the triple-containment philosophy. This seems to be the most convenient principle to use near the ESS targets, as it provides a larger degree of freedom with respect to the arrangement of these sources and pipe connections to the chambers, especially because the space is limited and access to the target is relatively complicated. The moderator chambers have been designed by KFA, Juelich and the rest of the arrangement by Risoe, DK. The price calculations used for the ESS project are based upon this arrangement. (au)

  6. Description of the moderator systems for the ESS project

    Energy Technology Data Exchange (ETDEWEB)

    Stendal, K.

    1996-10-01

    This paper describes a suggestion for the arrangement of the Cold Neutron Sources for the two targets in the ESS project. (European Spallation Source). The suggestion is based upon the technique of the existing cold neutron sources at Risoe in Denmark, HMI and Geestacht in Germany. As moderating media all of them use H{sub 2} in supercritical condition, circulated by blowers, and the safety of the systems is based upon the triple-containment philosophy. This seems to be the most convenient principle to use near the ESS targets, as it provides a larger degree of freedom with respect to the arrangement of these sources and pipe connections to the chambers, especially because the space is limited and access to the target is relatively complicated. The moderator chambers have been designed by KFA, Juelich and the rest of the arrangement by Risoe, DK. The price calculations used for the ESS project are based upon this arrangement. (au).

  7. The Co-mentoring Project: Overview and Outcomes

    Directory of Open Access Journals (Sweden)

    Renée A. Zucchero, PhD

    2008-08-01

    Full Text Available The Co-mentoring Project matched developmental psychology students with older adult volunteers for an intergenerational learning experience. Students conducted a biopsychosocial life review to increase understanding of older adult development and the continuity in lifespan development. Each student developed a summary paper containing the older adult’s life history, a developmental analysis, and personal reflection. A project description, including the scholarship of teaching and learning, and an overview of its outcomes are presented. The project goal was accomplished; students positively evaluated learning outcomes and displayed a significant increase in knowledge about older adults and aging. Implications for college instructors are discussed.

  8. 49 CFR Appendix A to Part 611 - Description of Measures Used for Project Evaluation.

    Science.gov (United States)

    2010-10-01

    ...) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION MAJOR CAPITAL INVESTMENT PROJECTS Pt. 611... project isolate the costs and benefits of the major transit investment. At a minimum, the baseline... investment in the new start project. Depending on the circumstances and through prior agreement with FTA, the...

  9. Fort Hood Solar Total Energy Project. Volume II. Preliminary design. Part 1. System criteria and design description. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1979-01-01

    This volume documents the preliminary design developed for the Solar Total Energy System to be installed at Fort Hood, Texas. Current system, subsystem, and component designs are described and additional studies which support selection among significant design alternatives are presented. Overall system requirements which form the system design basis are presented. These include program objectives; performance and output load requirements; industrial, statutory, and regulatory standards; and site interface requirements. Material in this section will continue to be issued separately in the Systems Requirements Document and maintained current through revision throughout future phases of the project. Overall system design and detailed subsystem design descriptions are provided. Consideration of operation and maintenance is reflected in discussion of each subsystem design as well as in an integrated overall discussion. Included are the solar collector subsystem; the thermal storage subsystem, the power conversion sybsystem (including electrical generation and distribution); the heating/cooling and domestic hot water subsystems; overall instrumentation and control; and the STES building and physical plant. The design of several subsystems has progressed beyond the preliminary stage; descriptions for such subsystems are therefore provided in more detail than others to provide complete documentation of the work performed. In some cases, preliminary design parameters require specific verificaton in the definitive design phase and are identified in the text. Subsystem descriptions will continue to be issued and revised separately to maintain accuracy during future phases of the project. (WHK)

  10. Nevada Nuclear Waste Storage Investigations. FY 1979 project plan

    International Nuclear Information System (INIS)

    1979-03-01

    This document presents the management and cost for the Nevada Nuclear Waste Storage Investigations (disposal of high-level wastes at Nevada Test Site) and provides a complete description of the overall project, management structure, technical approach, and work breakdown structure. The document is organized into five major sections. Section I summarizes the history of the project and indicates a potential future course of action. FY 1979 project work is briefly described in Section II. Section III outlines the delegated responsibilities of all project management functions. A list of critical questions that guide the technical approach of the project are presented in Section IV. Section V contains subtask work plans which outline the work in detail for this fiscal year

  11. Ensuring effective project management

    International Nuclear Information System (INIS)

    Ward, J.N.

    1980-01-01

    A brief description is given of the organisation methods employed by the Bechtel Power Corporation, in their contract with Mississippi Power and Light Company for the design, construction and procurement activities for the Grand Gulf Nuclear Station. The aim is to ensure effective management, and good communications at all stages of construction, between the project team and the client. (U.K.)

  12. Service Learning in Medical Education: Project Description and Evaluation

    Science.gov (United States)

    Borges, Nicole J.; Hartung, Paul J.

    2007-01-01

    Although medical education has long recognized the importance of community service, most medical schools have not formally nor fully incorporated service learning into their curricula. To address this problem, we describe the initial design, development, implementation, and evaluation of a service-learning project within a first-year medical…

  13. MORE: Management of Requirements in NPP Modernisation Projects, final report

    International Nuclear Information System (INIS)

    Fredriksen, R.; Katta, V.; Raspotnig, C.; Valkonen, J.

    2008-09-01

    This report documents the work and related activities of the MORE (Management of Requirements in NPP Modernisation Projects) (NKS-R project number NKS-R-2005-47) project. This report also provides a summary of the project activities and deliverables, and discusses possible application areas. The project has aimed at the industrial utilisation of the results from the TACO: (Traceability and Communication of Requirements in Digital I and C Systems Development) (NKS-R project number NKS-R-2002-16, completed June, 2005) project, and practical application of improved approaches and methods for requirements engineering and change management. Finally, the report provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  14. MORE: Management of Requirements in NPP Modernisation Projects, final report

    Energy Technology Data Exchange (ETDEWEB)

    Fredriksen, R.; Katta, V.; Raspotnig, C. (Inst. for energiteknikk (IFE) (Norway)); Valkonen, J. (Technical Research Centre of Finland (VTT) (Finland))

    2008-09-15

    This report documents the work and related activities of the MORE (Management of Requirements in NPP Modernisation Projects) (NKS-R project number NKS-R-2005-47) project. This report also provides a summary of the project activities and deliverables, and discusses possible application areas. The project has aimed at the industrial utilisation of the results from the TACO: (Traceability and Communication of Requirements in Digital I and C Systems Development) (NKS-R project number NKS-R-2002-16, completed June, 2005) project, and practical application of improved approaches and methods for requirements engineering and change management. Finally, the report provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (author)

  15. From project management to project leadership

    NARCIS (Netherlands)

    Braun, F.; Avital, M.

    2010-01-01

    It is virtually a truism that good leadership practices can help project managers with attaining the desired project outcome. However, a better understanding of which leadership practices enable project managers to be more effective warrants further investigation. Subsequently, in this study, we

  16. Deactivation, Decontamination and Decommissioning Project Summaries

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, David Shane; Webber, Frank Laverne

    2001-07-01

    This report is a compilation of summary descriptions of Deactivation, Decontamination and Decommissioning, and Surveillance and Maintenance projects planned for inactive facilities and sites at the INEEL from FY-2002 through FY-2010. Deactivations of contaminated facilities will produce safe and stable facilities requiring minimal surveillance and maintenance pending further decontamination and decommissioning. Decontamination and decommissioning actions remove contaminated facilities, thus eliminating long-term surveillance and maintenance. The projects are prioritized based on risk to DOE-ID, the public, and the environment, and the reduction of DOE-ID mortgage costs and liability at the INEEL.

  17. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  18. DEVELOPMENT OF A METADATA MANAGEMENT SYSTEM FOR AN INTERDISCIPLINARY RESEARCH PROJECT

    Directory of Open Access Journals (Sweden)

    C. Curdt

    2012-07-01

    Full Text Available In every interdisciplinary, long-term research project it is essential to manage and archive all heterogeneous research data, produced by the project participants during the project funding. This has to include sustainable storage, description with metadata, easy and secure provision, back up, and visualisation of all data. To ensure the accurate description of all project data with corresponding metadata, the design and implementation of a metadata management system is a significant duty. Thus, the sustainable use and search of all research results during and after the end of the project is particularly dependent on the implementation of a metadata management system. Therefore, this paper will describe the practical experiences gained during the development of a scientific research data management system (called the TR32DB including the corresponding metadata management system for the multidisciplinary research project Transregional Collaborative Research Centre 32 (CRC/TR32 'Patterns in Soil-Vegetation-Atmosphere Systems'. The entire system was developed according to the requirements of the funding agency, the user and project requirements, as well as according to recent standards and principles. The TR32DB is basically a combination of data storage, database, and web-interface. The metadata management system was designed, realized, and implemented to describe and access all project data via accurate metadata. Since the quantity and sort of descriptive metadata depends on the kind of data, a user-friendly multi-level approach was chosen to cover these requirements. Thus, the self-developed CRC/TR32 metadata framework is designed. It is a combination of general, CRC/TR32 specific, as well as data type specific properties.

  19. Mobile Learning Projects - a critical analysis of the state of the art

    OpenAIRE

    Frohberg, D; Göth, C; Schwabe, G

    2009-01-01

    A brief narrative description of the journal article, document, or resource. This paper provides a critical analysis of Mobile Learning projects published before the end of 2007. The review uses a Mobile Learning framework to evaluate and categorize 102 Mobile Learning projects, and to briefly introduce exemplary projects for each category. All projects were analysed with the criteria: context, tools, control, communication, subject and objective. Although a significant number of projects hav...

  20. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  1. Project Success in Agile Development Software Projects

    Science.gov (United States)

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  2. An IS Project Management Course Project

    Science.gov (United States)

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  3. Evaluation of Project Achievements in VOMARE -project

    OpenAIRE

    Kokkarinen, Eeva

    2011-01-01

    The purpose of the thesis is to study the achievements of VOMARE –project from the Finnish Lifeboat Institutions perspective. The organisation is a roof organisation for voluntary maritime rescue operation in Finland. The Finnish Lifeboat Institution is a lead partner in VOMARE –project which is EU funded project and the aim of the project is to start voluntary rescue operations in Estonia. The theoretical part of the work is divided into two main categories; project management and planni...

  4. Leading global projects for professional and accidental project leaders

    CERN Document Server

    Moran, Robert T

    2008-01-01

    This book is a must-read for anyone responsible for projects and initiatives that span functional and geographical divides. Authors Moran and Youngdahl bring extensive experience and learning from industry practice to present a clear and straightforward treatment of the leadership skills and knowledge required to lead projects that are global in nature. They have written the first book of its kind to address the three essential skills of global project leaders - strategic project management, project leadership, and cross-cultural leadership. The authors argue that global project leadership is an essential skill in our project-based world and that we are all either intentional or accidental project leaders. Intentional project leaders pursue formal project management education and even certification whereas accidental project leaders find themselves leading global projects and initiatives as a result of a special assignment or promotion. Moran and Youndahl have found that the vast majority of global projects ...

  5. Translation of SNOMED CT - strategies and description of a pilot project.

    Science.gov (United States)

    Klein, Gunnar O; Chen, Rong

    2009-01-01

    The translation and localization of SNOMED CT (Systematized Nomenclature of Medicine - Clinical Terms) have been initiated in a few countries. In Sweden, we conducted the first evaluation of this terminology in a project called REFTERM in which we also developed a software tool which could handle a large scale translation with a number of translators and reviewers in a web-based environment. The system makes use of existing authorized English-Swedish translations of medical terminologies such as ICD-10. The paper discusses possible strategies for a national project to translate and adapt this terminology.

  6. Computing the maximum volume inscribed ellipsoid of a polytopic projection

    NARCIS (Netherlands)

    Zhen, Jianzhe; den Hertog, Dick

    We introduce a novel scheme based on a blending of Fourier-Motzkin elimination (FME) and adjustable robust optimization techniques to compute the maximum volume inscribed ellipsoid (MVE) in a polytopic projection. It is well-known that deriving an explicit description of a projected polytope is

  7. Computing the Maximum Volume Inscribed Ellipsoid of a Polytopic Projection

    NARCIS (Netherlands)

    Zhen, J.; den Hertog, D.

    2015-01-01

    We introduce a novel scheme based on a blending of Fourier-Motzkin elimination (FME) and adjustable robust optimization techniques to compute the maximum volume inscribed ellipsoid (MVE) in a polytopic projection. It is well-known that deriving an explicit description of a projected polytope is

  8. Project for construction of a new nuclear unit in Armenia

    International Nuclear Information System (INIS)

    2010-01-01

    WorleyParsons Project Description Scope of work: Management Services for Implementation of the Project on Construction of New Nuclear Unit(s) in the Republic of Armenia. Client: Ministry of Energy and Natural Resources (MENR), Republic of Armenia •Contract signed on 29 of May 2009 •Project divided into 4 Phases. Addendum 1 covers phase I and II signed on 27 of July. Contract entered into force 7 of August

  9. Projection of greenhouse gases 2011-2035

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, O -K; Plejdrup, M S; Winther, M [and others

    2013-02-15

    This report contains a description of models, background data and projections of CO{sub 2}, CH{sub 4}, N{sub 2}O, HFCs, PFCs and SF{sub 6} for Denmark. The emissions are projected to 2035 using a scenario combined with the expected results of a few individual policy measures. Official Danish forecasts of activity rates are used in the models for those sectors for which forecasts are available, i.e. the latest official forecast from the Danish Energy Agency. The emission factors refer to international guidelines and some are country-specific and refer to Danish legislation, Danish research reports or calculations based on emission data from a considerable number of industrial plants. The projection models are based on the same structure and method as the Danish emission inventories in order to ensure consistency. (Author)

  10. Instrumentation project of 3rd desalination plant at Tuas (Singapore)

    OpenAIRE

    Charco Iniesta, Sara

    2016-01-01

    This project consists on the description of instrumentation used in Tuas III desalination plant at Singapore and its flow process description. The project has been developed as part of the work of the instrumentation department of the responsible company of the engineering design of Tuas III desalination plant. First of all is important to know the water problems which suffer all the people who live in Singapore. Singapore is a city-state and is home to 5.5 million residents. The coun...

  11. Prioritising Project Scope Definition Elements in Public Building Projects

    Directory of Open Access Journals (Sweden)

    Mohammed K Fageha

    2014-09-01

    Full Text Available A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI as a basis, the study uses analytical network process (ANP technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of contribution to project scope definition completeness. Finally, Pareto analysis was used to prioritise and assess the distribution pattern of the elements. The outcome from this research is the prioritisation of project scope definition elements for public building projects in Saudi Arabia. The prioritised list developed indicates the importance of project scope definition elements. It should help project management teams identify elements to consider when evaluating project scope definition for completeness at the pre-project planning stage. Keywords: Project scope definition, pre-project planning, prioritising, public building projects, Saudi Arabia, Analytical Network Process (ANP

  12. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase III of the Prototypical Rod Consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod Consolidation System as described in the NUS Phase II Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase III effort the system was tested on a component, subsystem, and system level. Volume IV provides the Operating and Maintenance Manual for the Prototypical Rod Consolidation System that was installed at the Cold Test Facility. This document, Book 1 of Volume IV, discusses: Process overview functional descriptions; Control system descriptions; Support system descriptions; Maintenance system descriptions; and Process equipment descriptions

  13. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  14. Perspectives on projects, project success and team work

    OpenAIRE

    Thompson, Karen

    2015-01-01

    This paper brings together perspectives on projects, project success and team work as a background to two graphical tools for considering project success and individual capabilities for working in a project team.

  15. HIE-ISOLDE, the project and the physics opportunities

    Energy Technology Data Exchange (ETDEWEB)

    Borge, M.J.G. [ISOLDE, EP Department, CERN, Geneva 23 (Switzerland); Instituto de Estructura de la Materia, CSIC, Madrid (Spain); Riisager, K. [Aarhus University, Department of Physics and Astronomy, Aarhus C (Denmark)

    2016-11-15

    The ISOLDE facility at CERN offers the largest selection of ISOL beams today. The overall aim of the HIE-ISOLDE project is to enlarge the physics domains achievable with these beams, in particular by raising the maximum energy of post-accelerated beams to more than 10 MeV/u. An outline of the history of the project is followed by a succinct description of the superconducting linac chosen for acceleration and an overview of the parts of the project aiming to the improvement of the beam quality and intensity. Concrete examples are given of experiments that will be performed at HIE-ISOLDE. (orig.)

  16. Project Management Yinyang: Coupling project success and client satisfaction

    Directory of Open Access Journals (Sweden)

    Greg Stewart Usher

    2017-06-01

    Full Text Available Our research applies paradox theory to a project management construct to help project management researchers and practitioners understand the tensions that can exist between project success and client satisfaction. Our research highlights that although project success and client satisfaction are both present within a project management construct, they also belong to different functional systems. Project success and client satisfaction have different systemic-discourses and use different language games to convey information. These distinctions can create latent and sometimes salient tensions within the project management construct that project managers must understand, embrace, and work with. We have used a Grounded Theory (GT methodology to explore the lived experience of project managers, and from this have identified a phenomenon which we have termed project management yinyang. Project management yinyang is the state that exists when both project success and Client satisfaction are tightly coupled within the project management construct. Project management yinyang highlights that these two phenomena cannot be viewed as separate elements because the ‘seed’ of each exists within the other. And to truly achieve one, you must also achieve the other. Our findings indicate that in order to create project management yinyang the project manager must embrace a paradoxical yet holistic philosophy. They must understand the complementarity, interdependency, and structural coupling that exists between the positivist and interpretivist paradigms within the project management construct. They must understand how satisfaction (Yin and success (Yang are created through focus. Furthermore, they must understand how project management yinyang is separate from, but borne from, the convergence of the other two elements.

  17. Quality of the restricted variation after projection method with angular momentum projection

    International Nuclear Information System (INIS)

    Rodriguez, Tomas R.; Egido, J.L.; Robledo, L.M.; Rodriguez-Guzman, R.

    2005-01-01

    Recently, the restricted angular momentum variation after projection method, using the quadrupole degree of freedom as a variational coordinate in conjunction with effective interactions of the Skyrme or Gogny type, has been used very successfully to study a variety of phenomena concerning the quadrupole degree of freedom. In this paper, we study the quality of such an approach by considering additional degrees of freedom as variational coordinates: the hexadecapole moment and the fluctuations on the quadrupole moment, particle number, and angular momentum operators. The study has been performed with the Gogny interaction (D1S parametrization) for the nuclei 32 Mg and 34 Mg. The results of the angular momentum projection and the subsequent generator coordinate calculations show that the extra degrees of freedom considered are irrelevant for the description of the lowest lying states for each angular momentum

  18. Quality Assurance Project Plan for Citizen Science Projects

    Science.gov (United States)

    The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.

  19. Atmospheric River Tracking Method Intercomparison Project (ARTMIP: project goals and experimental design

    Directory of Open Access Journals (Sweden)

    C. A. Shields

    2018-06-01

    Full Text Available The Atmospheric River Tracking Method Intercomparison Project (ARTMIP is an international collaborative effort to understand and quantify the uncertainties in atmospheric river (AR science based on detection algorithm alone. Currently, there are many AR identification and tracking algorithms in the literature with a wide range of techniques and conclusions. ARTMIP strives to provide the community with information on different methodologies and provide guidance on the most appropriate algorithm for a given science question or region of interest. All ARTMIP participants will implement their detection algorithms on a specified common dataset for a defined period of time. The project is divided into two phases: Tier 1 will utilize the Modern-Era Retrospective analysis for Research and Applications, version 2 (MERRA-2 reanalysis from January 1980 to June 2017 and will be used as a baseline for all subsequent comparisons. Participation in Tier 1 is required. Tier 2 will be optional and include sensitivity studies designed around specific science questions, such as reanalysis uncertainty and climate change. High-resolution reanalysis and/or model output will be used wherever possible. Proposed metrics include AR frequency, duration, intensity, and precipitation attributable to ARs. Here, we present the ARTMIP experimental design, timeline, project requirements, and a brief description of the variety of methodologies in the current literature. We also present results from our 1-month proof-of-concept trial run designed to illustrate the utility and feasibility of the ARTMIP project.

  20. Nylsvley - South African Savanna ecosystem project: objectives, organisation and research programme

    CSIR Research Space (South Africa)

    Huntley, BJ

    1978-03-01

    Full Text Available A description of the objectives, organization and research programme of the Savanna Ecosystem Project being undertaken at Nylsvley in the northern Transvaal is presented. The project is a cooperative multi-disciplinary study of the structure...

  1. THE HUNT FOR EXOMOONS WITH KEPLER (HEK). I. DESCRIPTION OF A NEW OBSERVATIONAL PROJECT

    International Nuclear Information System (INIS)

    Kipping, D. M.; Bakos, G. Á.; Buchhave, L.; Nesvorný, D.; Schmitt, A.

    2012-01-01

    Two decades ago, empirical evidence concerning the existence and frequency of planets around stars, other than our own, was absent. Since that time, the detection of extrasolar planets from Jupiter-sized to, most recently, Earth-sized worlds has blossomed and we are finally able to shed light on the plurality of Earth-like, habitable planets in the cosmos. Extrasolar moons may also be frequently habitable worlds, but their detection or even systematic pursuit remains lacking in the current literature. Here, we present a description of the first systematic search for extrasolar moons as part of a new observational project called 'The Hunt for Exomoons with Kepler' (HEK). The HEK project distills the entire list of known transiting planet candidates found by Kepler (2326 at the time of writing) down to the most promising candidates for hosting a moon. Selected targets are fitted using a multimodal nested sampling algorithm coupled with a planet-with-moon light curve modeling routine. By comparing the Bayesian evidence of a planet-only model to that of a planet-with-moon, the detection process is handled in a Bayesian framework. In the case of null detections, upper limits derived from posteriors marginalized over the entire prior volume will be provided to inform the frequency of large moons around viable planetary hosts, η leftmoon. After discussing our methodologies for target selection, modeling, fitting, and vetting, we provide two example analyses.

  2. IDC Reengineering Phase 2 Project Scope.

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-02-01

    This report provides a brief description of the scope of the IDC Reengineering Phase 2 project. It describes the goals and objectives of reengineering, the system definition, and the technical scope of the system. REVISIONS Version Date Author/Team Revision Description Authorized by 1.0 9/25/2014 SNL IDC Reengineering Team Unlimited Release for I2 M. Harris 1.1 28/01/2015 IDC Reengineering Team Align with previous IDC scope document E. Tomuta.

  3. Lake Charles CCS Project

    Energy Technology Data Exchange (ETDEWEB)

    Leib, Thomas [Leucadia Energy, LLC, Salt Lake City, UT (United States); Cole, Dan [Denbury Onshore, LLC, Plano, TX (United States)

    2015-06-30

    In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture and Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO2) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO2 generated in a large industrial gasification process and sequester the CO2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials

  4. International assistance. Licensing assistance project

    International Nuclear Information System (INIS)

    Aleev, A.

    1999-01-01

    Description of licensing assistance project for VATESI is presented. In licensing of unit No.1 of INPP VATESI is supported by many western countries. Experts from regulatory bodies or scientific organizations of those countries assist VATESI staff in reviewing documentation presented by INPP. Among bilateral cooperation support is provided by European Commission through Phare programme

  5. Data description and quality assessment of ionospheric electron density profiles for ARPA modeling project. Technical report

    International Nuclear Information System (INIS)

    Conkright, R.O.

    1977-03-01

    This report presents a description of the automated method used to produce electron density (N(h)) profiles from ionograms recorded on 35mm film and an assessment of the resulting data base. A large data base of about 30,000 profiles was required for an ionospheric modeling project. This motivated a search for an automated method of producing profiles. The automated method used is fully described, the resulting data are given a quality grade, and the noon and midnight profiles are presented. Selected portions of this data base are compared with profiles produced by the standard profiling method in use by the Environmental Data Service at Boulder, Colorado

  6. Significant projects on renewable energy. Stoerre VE-projekter; Informations- og undersoegelsesaktiviteter

    Energy Technology Data Exchange (ETDEWEB)

    1989-07-01

    A collection of descriptions of projects, financially supported by the Danish government, and which are related to the use of renewable energy sources. Emphasis is laid on the economical aspects, and an evaluation of each project is presented. (AB).

  7. Project Management

    DEFF Research Database (Denmark)

    Pilkington, Alan; Chai, Kah-Hin; Le, Yang

    2015-01-01

    This paper identifies the true coverage of PM theory through a bibliometric analysis of the International Journal of Project Management from 1996-2012. We identify six persistent research themes: project time management, project risk management, programme management, large-scale project management......, project success/failure and practitioner development. These differ from those presented in review and editorial articles in the literature. In addition, topics missing from the PM BOK: knowledge management project-based organization and project portfolio management have become more popular topics...

  8. Project financing

    International Nuclear Information System (INIS)

    Cowan, A.

    1998-01-01

    Project financing was defined ('where a lender to a specific project has recourse only to the cash flow and assets of that project for repayment and security respectively') and its attributes were described. Project financing was said to be particularly well suited to power, pipeline, mining, telecommunications, petro-chemicals, road construction, and oil and gas projects, i.e. large infrastructure projects that are difficult to fund on-balance sheet, where the risk profile of a project does not fit the corporation's risk appetite, or where higher leverage is required. Sources of project financing were identified. The need to analyze and mitigate risks, and being aware that lenders always take a conservative view and gravitate towards the lowest common denominator, were considered the key to success in obtaining project financing funds. TransAlta Corporation's project financing experiences were used to illustrate the potential of this source of financing

  9. Wisdom for Building the Project Manager/Project Sponsor Relationship: Partnership for Project Success

    National Research Council Canada - National Science Library

    Patton, Nanette; Shechet, Allan

    2007-01-01

    .... This article discusses conventional roles and responsibilities of the project sponsor and then discusses strategies a project manager can employ to define boundaries to reduce role confusion and promote partnership to facilitate project success.

  10. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  11. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  12. Project Management Plan to Maintain Safe and Compliant Conditions at the Plutonium Finishing Plant

    International Nuclear Information System (INIS)

    COX, G.J.

    1999-01-01

    This Project Management Plan presents the overall plan, description, mission, and workscope for the Plutonium Finishing Plant (PFP) maintain safe and compliant conditions project at PFP. This plan presents the overall description, mission, work scope, and planning for the Plutonium Finishing Plant (PFP) Maintain Safe and Compliant Conditions Project at PFP. This project includes all tasks required to maintain the safety boundary for the PFP Complex, except for the 2736-2 Vault Complex and the 234-52 vaults and vault-type rooms. The intent of this plan is to describe how this project will be managed and integrated with the stabilization, and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines that will manage the execution of this project. It describes the organizational approach and roles/responsibilities implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action

  13. Project structure plan requirements for the deconstruction projects

    International Nuclear Information System (INIS)

    Petrasch, Peter; Schmitt, Christian; Stapf, Meike

    2011-01-01

    The deconstruction of nuclear facilities requires due to the particular conditions and the size of the project a special project planning. The authors analyze the possible requirements to be fulfilled by a project structure plan for nuclear facilities, including personnel resources, organization structure, budget questions, operation and project oriented measures, possibility of modifications and supplements. Further topics include controlling and project realization procedures, documentation, third party activities (authorities, consultants, surveyors), logistics and transport, and radiation protection issues. Several questions remain for plants-specific planning, including the integration of the plant personnel, administrative work, project management, economic and financial issues, radioactive waste management issues.

  14. Adapting Project Management Practices to Research-Based Projects

    Science.gov (United States)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  15. Reactor-specific spent fuel discharge projections, 1984 to 2020

    International Nuclear Information System (INIS)

    Heeb, C.M.; Libby, R.A.; Holter, G.M.

    1985-04-01

    The original spent fuel utility data base (SFDB) has been adjusted to produce agreement with the EIA nuclear energy generation forecast. The procedure developed allows the detail of the utility data base to remain intact, while the overall nuclear generation is changed to match any uniform nuclear generation forecast. This procedure adjusts the weight of the reactor discharges as reported on the SFDB and makes a minimal (less than 10%) change in the original discharge exposures in order to preserve discharges of an integral number of fuel assemblies. The procedure used in developing the reactor-specific spent fuel discharge projections, as well as the resulting data bases themselves, are described in detail in this report. Discussions of the procedure cover the following topics: a description of the data base; data base adjustment procedures; addition of generic power reactors; and accuracy of the data base adjustments. Reactor-specific discharge and storage requirements are presented. Annual and cumulative discharge projections are provided. Annual and cumulative requirements for additional storage are shown for the maximum at-reactor (AR) storage assumption, and for the maximum AR with transshipment assumption. These compare directly to the storage requirements from the utility-supplied data, as reported in the Spent Fuel Storage Requirements Report. The results presented in this report include: the disaggregated spent fuel discharge projections; and disaggregated projections of requirements for additional spent fuel storage capacity prior to 1998. Descriptions of the methodology and the results are included in this report. Details supporting the discussions in the main body of the report, including descriptions of the capacity and fuel discharge projections, are included. 3 refs., 6 figs., 12 tabs

  16. A real CDIO mechanical engineering project in 4th semester

    DEFF Research Database (Denmark)

    Lauritsen, Aage Birkkjær

    In the past 6 years at the mechanical engineering study at the Engineering College of Aarhus we have been practicing project work on 4th Semester in the design of energy technology systems. In my presentation, I will give a description of the project, and the thoughts behind; pedagogic......-6 students, and will partly support the general theory being taught in the courses, but will also provide students with skills in teamwork, project work and system building. The pedagogical considerations behind the development of the project are quite simply that students learn best through active work...

  17. Organization of BSc and MSc projects in project families

    DEFF Research Database (Denmark)

    Ottosen, Lisbeth M.; Goltermann, Per; Jensen, Pernille Erland

    2014-01-01

    This work reports organization of student thesis projects in project families, with the benefit to both teaching and learning. The project organization went from student projects broadly distributed on topics related to different research issues and individual supervision to project families with...

  18. Staff training program of CANDU projects in Saskatoon

    International Nuclear Information System (INIS)

    Huterer, J.

    1996-01-01

    This paper describes the training process for a nuclear project on a new site. When AECL opened a project office Saskatoon, senior management recognized the need for large scale staff training and made the necessary commitments. Two types of training programs were initiated, general and technical. The general training plan included topics related to nuclear project life cycle. Technical training was discipline and task specific. Based on the job descriptions and staff qualifications, technical training requirements were documented for the entire staff. The training strategy was developed and implemented. Detailed records were maintained to monitor the progress, draw conclusions, and plan training for future nuclear facilities. (author)

  19. Project studies

    DEFF Research Database (Denmark)

    Geraldi, Joana; Söderlund, Jonas

    2018-01-01

    Project organising is a growing field of scholarly inquiry and management practice. In recent years, two important developments have influenced this field: (1) the study and practice of projects have extended their level of analysis from mainly focussing on individual projects to focussing on micro......, and of the explanations of project practices they could offer. To discuss avenues for future research on projects and project practice, this paper suggests the notion of project studies to better grasp the status of our field. We combine these two sets of ideas to analyse the status and future options for advancing...... project research: (1) levels of analysis; and (2) type of research. Analysing recent developments within project studies, we observe the emergence of what we refer to as type 3 research, which reconciles the need for theoretical development and engagement with practice. Type 3 research suggests pragmatic...

  20. Multiple levels in the organisation of innovation : project organization in single-firm projects and multi-firm projects

    NARCIS (Netherlands)

    Jaspers, F.P.H.; Ende, van den J.C.M.; Borgh, van der W.; Yin, Jie

    2008-01-01

    Studies about how the organization of new product (and new service) development projects (NPD) projects influences project performance typically investigate this in Single-firm projects, i.e. projects with high ownership integration. However, NPD projects are often performed by two or more

  1. 1980 survey and evaluation of utility conservation, load management, and solar end-use projects. Volume 3: utility load management projects. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    The results of the 1980 survey of electric utility-sponsored energy conservation, load management, and end-use solar energy conversion projects are described. The work is an expansion of a previous survey and evaluation and has been jointly sponsored by EPRI and DOE through the Oak Ridge National Laboratory. There are three volumes and a summary document. Each volume presents the results of an extensive survey to determine electric utility involvement in customer-side projects related to the particular technology (i.e., conservation, solar, or load management), selected descriptions of utility projects and results, and first-level technical and economic evaluations.

  2. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project. Backgorund information

    International Nuclear Information System (INIS)

    1992-09-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  3. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    Science.gov (United States)

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  4. Project financing

    International Nuclear Information System (INIS)

    Alvarez, M.U.

    1990-01-01

    This paper presents the basic concepts and components of the project financing of large industrial facilities. Diagrams of a simple partnership structure and a simple leveraged lease structure are included. Finally, a Hypothetical Project is described with basic issues identified for discussion purposes. The topics of the paper include non-recourse financing, principal advantages and objectives, disadvantages, project financing participants and agreements, feasibility studies, organization of the project company, principal agreements in a project financing, insurance, and an examination of a hypothetical project

  5. Ponnequin Wind Energy Project Weld County, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-08-01

    The purpose of this environmental assessment (EA) is to provide the U.S. Department of Energy (DOE) and the public with information on potential environmental impacts associated with the development of the Ponnequin Wind Energy Project in Colorado. This EA and public comments received on it will be used in DOE`s deliberations on whether to release funding for the project. This document provides a detailed description of the proposed project and an assessment of potential impacts associated with its construction and operations. Resources and conditions considered in the analysis include streams; wetlands; floodplains; water quality; soils; vegetation; air quality; socioeconomic conditions; energy resources; noise; transportation; cultural resources; visual and land use resources; public health and safety; wildlife; threatened, endangered, and candidate species; and cumulative impacts. The analysis found that the project would have minimal impacts on these resources and conditions, and would not create impacts that exceed the significance criteria defined in this document. 90 refs., 5 figs.

  6. Project Notes

    Science.gov (United States)

    School Science Review, 1978

    1978-01-01

    Presents sixteen project notes developed by pupils of Chipping Norton School and Bristol Grammar School, in the United Kingdom. These Projects include eight biology A-level projects and eight Chemistry A-level projects. (HM)

  7. Project Management and the Project Manager: A Strategy for ...

    African Journals Online (AJOL)

    International Journal of Development and Management Review ... collapse, project failure, project abandonment, project cost and time overruns, etc. ... component parts that constitute project management in the building construction industry.

  8. NASA's Morphing Project Research Summaries in Fiscal Year 2002

    Science.gov (United States)

    McGowan, Anna-Maria R.; Waszak, Martin R.

    2005-01-01

    The Morphing Project at the National Aeronautics and Space Agency s (NASA) Langley Research Center (LaRC) is part of the Breakthrough Vehicle Technologies Project, Vehicle Systems Program that conducts fundamental research on advanced technologies for future flight vehicles. The objectives of the Morphing Project are to develop and assess the advanced technologies and integrated component concepts to enable efficient, multi-point adaptability of flight vehicles; primarily through the application of adaptive structures and adaptive flow control to substantially alter vehicle performance characteristics. This document is a compilation of research summaries and other information on the project for fiscal year 2002. The focus is to provide a brief overview of the project content, technical results and lessons learned. At the time of publication, the Vehicle Systems Program (which includes the Morphing Project) is undergoing a program re-planning and reorganization. Accordingly, the programmatic descriptions of this document pertain only to the program as of fiscal year 2002.

  9. CDIO Projects in Civil Engineering Study Program at DTU

    DEFF Research Database (Denmark)

    Krogsbøll, Anette; Simonsen, Claus; Christensen, Jørgen Erik

    2011-01-01

    or a design build project on each of the first four semesters. In this paper the four projects in the civil engineering study program are described along with a brief description of the entire study program. The aim is to provide additional information and documentation to accompany an exposition where......In 2008 all Bachelor of engineering study programs at the Technical University of Denmark (DTU) have been adopted to the “Conceive – Design – Implement – Operate” approach. As part of the necessary changes it was decided that all seven study programs should have a cross disciplinary project...... students present their projects. Learning outcomes, training and assessment of personal, professional and social engineering skills are described from a project point of view. Progression of engineering skills is discussed from a study program perspective. The interrelation between the various elements...

  10. Spatial conditions - the 3. supervisor in project organized teaching?

    DEFF Research Database (Denmark)

    Bering Keiding, Tina

    through reflection of its own border: is this new issue inside or outside the project. Individual rooms make it easier for the project to stabilize around its eigenvalues, but also enhance the risk of cognitive jog-trot. The challenge in this case becomes to seek out disturbances which can initiate new......The contribution presents a pilot study on project work situated in different spatial contexts. The main question for the study is if and how spatial conditions influence the interaction within and between projects. Possible answers to the question are sought through observations, informal...... interviews and questionnaires. The empirical findings are reflected in a Luhmann-based re-description of project organized group based teaching (Keiding 2008). Preliminary conclusions indicate that one big difference between open-space studio and individual group rooms is related to the immediate public...

  11. Patient and Stakeholder Engagement in the PCORI Pilot Projects: Description and Lessons Learned.

    Science.gov (United States)

    Forsythe, Laura P; Ellis, Lauren E; Edmundson, Lauren; Sabharwal, Raj; Rein, Alison; Konopka, Kristen; Frank, Lori

    2016-01-01

    Patients and healthcare stakeholders are increasingly becoming engaged in the planning and conduct of biomedical research. However, limited research characterizes this process or its impact. We aimed to characterize patient and stakeholder engagement in the 50 Pilot Projects funded by the Patient-Centered Outcomes Research Institute (PCORI), and identify early contributions and lessons learned. A self-report instrument was completed by researchers between 6 and 12 months following project initiation. Forty-seven principal investigators or their designees (94 % response rate) participated in the study. MAIN MEASURES Self-report of types of stakeholders engaged, stages and levels of engagement, facilitators and barriers to engagement, lessons learned, and contributions from engagement were measured. Most (83 %) reported engaging more than one stakeholder in their project. Among those, the most commonly reported groups were patients (90 %), clinicians (87 %), health system representatives (44 %), caregivers (41 %), and advocacy organizations (41 %). Stakeholders were commonly involved in topic solicitation, question development, study design, and data collection. Many projects engaged stakeholders in data analysis, results interpretation, and dissemination. Commonly reported contributions included changes to project methods, outcomes or goals; improvement of measurement tools; and interpretation of qualitative data. Investigators often identified communication and shared leadership strategies as "critically important" facilitators (53 and 44 % respectively); lack of stakeholder time was the most commonly reported challenge (46 %). Most challenges were only partially resolved. Early lessons learned included the importance of continuous and genuine partnerships, strategic selection of stakeholders, and accommodation of stakeholders' practical needs. PCORI Pilot Projects investigators report engaging a variety of stakeholders across many stages of research, with specific

  12. The international remote monitoring project and implication

    International Nuclear Information System (INIS)

    Sonnier, C.S.; Johnson, C.S.

    1994-01-01

    The future of remote monitoring in International Safeguards system is analyzed. Problems of an update on the International Remote Monitoring Project are considered. The Project allows to remotely transmit safeguards-relevant data directly to IAEA from nuclear facilities worldwide. Description of integrated monitoring system (IMS) is given. A key element of state-of-art of IMS is modular nodal system which accepts information from sensors and provides information to both a data storage unit and a transmitter. Remote Monitoring Systems of Australia and Sweden are presented. 3 figs

  13. Biomarkers of genotoxicity of urban air pollution. Overview and descriptive data from a molecular epidemiology study on populations exposed to moderate-to-low levels of polycyclic aromatic hydrocarbons: the AULIS project

    DEFF Research Database (Denmark)

    Kyrtopoulos, S.A.; Georgiadis, P.; Autrup, H.

    2001-01-01

    in the context of the European Union Environment and Climate Programme, known by the short name of AULIS project, is discussed and descriptive statistics of the main findings of the project are presented. These findings indicate that for cohorts suffering moderate-to-low exposures to airborne particulate...

  14. Project No. 8 - Final decommissioning plan

    International Nuclear Information System (INIS)

    2000-01-01

    Ignalina NPP should prepare the final Ignalina NPP unit 1 decommissioning plan by march 31, 2002. This plan should include the following : description of Ignalina NPP and the Ignalina NPP boundary that could be influenced by decommissioning process; decommissioning strategy selected and a logical substantiation for this selection; description of the decommissioning actions suggested and a time schedule for the actions to be performed; conceptual safety and environmental impact assessment covering ionizing radiation and other man and environment impact; description of the environmental monitoring program proposed during decommissioning process; description of the waste management proposed; assessment of decommissioning expenses including waste management, accumulated funds and other sources. Estimated project cost - 0.75 M EURO

  15. Project Destiny: Initiating Physical Activity for Nonathletic Girls through Sport

    Science.gov (United States)

    Kyles, Carli; Lounsbery, Monica

    2004-01-01

    The purpose of this article is to emphasize the need to develop unique physical activity and sport programs that specifically target the participation of nonathletic and nonactive girls. In addition, the authors provide an overview of an example of one such program, Project Destiny. A description of Project Destiny is provided in terms of its…

  16. Locale-Specific Categorization of IT Projects for Proper Project Management

    Directory of Open Access Journals (Sweden)

    Muhammad Nasir

    2015-12-01

    Full Text Available In this paper we aim to show that not only are the project management techniques important for small-scale projects, but following proper project management techniques is one of the most important requirements. However, there come slight variations in implementing project management techniques in small projects as compared with larger projects. Therefore, proper categorization of projects holds the key to success in many situations. Our paper will show that categorization of a project as small-scale or large-scale should always be locale specific. In this regards, we develop a criteria and evaluate how the projects are categorized as small-scale and large-scale in different parts of the world with focus on IT projects. This research concludes that some methods cannot be used for projects of different scales.

  17. Projects of Iberdrola Engineering and Construction on the Flamanville 3 EPR

    International Nuclear Information System (INIS)

    Zornoza, J.; Dumas, H.; Sesma, J. L.; Cubian, B.; Diaz, J. I.

    2013-01-01

    Iberdrola Engineering and Construction is participating during the last 5 years in 5 projects on the Flamanville 3 EPR, both in the nuclear island and conventional island and the pump house. These projects represent a challenge from the technical point of view due to the high requirements applicable to the project because of the experience feedback of the operator EDF and of compliance with new regulations that have emerged since the completion of the last nuclear power station in France. This paper presents the description of these projects, as well as its current status. (Author)

  18. Managing Projects for Change: Contextualised Project Management

    Science.gov (United States)

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  19. Improving Project Portfolio Management (PPM) for Improvement Projects

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Jakobsen, Peter M.; Korsaa, Morten

    2017-01-01

    Project Portfolio Management (PPM) focus on the integration and alignment of projects with the business operation in order to achieve most value and cost-efficiency for the investment in projects. PPM is often a challenge and especially so for improvement projects where PPM is considerably...... of evaluating a portfolio of improvement projects and combine this evaluation with the effect they have on the CMMI maturity level. Further, the paper demonstrates how the combination of a strong senior management requirement for improved maturity and the focus on getting the most value out of PPM made...

  20. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  1. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  2. Nuclear fusion project. Semi-annual report of the Association KfK/EURATOM

    International Nuclear Information System (INIS)

    Kast, G.

    1987-05-01

    This semi-annual report gives 36 short descriptions of the work done in the framework of the Nuclear Fusion Project and outlines studies for NET/INTOR and for ECRH power sources at 150 GHz. Tables of fusion technology contracts, of NET contracts, of KfK departments contributing to the Fusion Project, and of the Fusion Project management staff complete this report. (GG)

  3. Evaluating the Peruvian Rural Communication Services Project.

    Science.gov (United States)

    Mayo, John

    1988-01-01

    Reviews the Peruvian Rural Communication Services (PRCS) Project and outlines selected findings. Topics discussed include a brief description of Peru's economic and social conditions; satellite communication systems; audio teleconferencing; telephone service; planning and administration; research design features; data collection; and project…

  4. Plutonium immobilization project development and testing quality assurance program description - February 1999

    International Nuclear Information System (INIS)

    MacLean, L. M.; Ziemba, J.

    1999-01-01

    Lawrence Livermore National Laboratory Immobilization Development and Testing organization (LLNL ID and T) is a Participant in the Plutonium Immobilization Project (PIP). The LLNL D and T has lead responsibilities for form characterization and qualification, ceramic form development, process/equipment development with plutonium, and process systems testing and validation for both conversion and immobilization. This work must be performed in accordance with the graded approach of a Quality Assurance (QA) Program. A QA Program has been developed at LLNL to meet the requirements of the DOE/MD Quality Assurance Requirements. The LLNL QA Program consists of a Quality Assurance Program Description (QAPD) and Quality Implementing Procedures. These documents interface and are a subset of the overall PIP QA Program Documents. The PIP QA Program is described in the PIP ID and T QA Plan, PIP QAPD, and QA Procedures. Other Participant Organizations also must document and describe their PIP compliant QA Programs in a QAPD and implementing procedures. The purpose of this LLNL QAPD is to describe the organization, management processes, QA Controls for Grading, functional responsibilities, levels of authority, and interfaces for those managing, performing, and assessing the adequacy of work

  5. A functional-dynamic reflection on participatory processes in modeling projects.

    Science.gov (United States)

    Seidl, Roman

    2015-12-01

    The participation of nonscientists in modeling projects/studies is increasingly employed to fulfill different functions. However, it is not well investigated if and how explicitly these functions and the dynamics of a participatory process are reflected by modeling projects in particular. In this review study, I explore participatory modeling projects from a functional-dynamic process perspective. The main differences among projects relate to the functions of participation-most often, more than one per project can be identified, along with the degree of explicit reflection (i.e., awareness and anticipation) on the dynamic process perspective. Moreover, two main approaches are revealed: participatory modeling covering diverse approaches and companion modeling. It becomes apparent that the degree of reflection on the participatory process itself is not always explicit and perfectly visible in the descriptions of the modeling projects. Thus, the use of common protocols or templates is discussed to facilitate project planning, as well as the publication of project results. A generic template may help, not in providing details of a project or model development, but in explicitly reflecting on the participatory process. It can serve to systematize the particular project's approach to stakeholder collaboration, and thus quality management.

  6. Enhancing public project implementation in Botswana during the NDP 11 period

    Directory of Open Access Journals (Sweden)

    Emmanuel Botlhale

    2017-08-01

    Full Text Available Successful project implementation is critical in development planning. If there is poor project implementation, economic development will be stalled. Generally, public project implementation has a chequered history. This is particularly true in developing countries which are characterised by low levels of project management maturity. The objective of this article is to review public project implementation in Botswana and recommend improvements for the National Development Plan (NDP 11 period (2017/2018-2022/2023. The article used the survey strategy and adopted the descriptive approach. Data collection sources were mixed, that is, primary and secondary sources. It concluded that public projects are either poorly implemented (i.e. not implemented in accordance with the ‘Project Management Triple Constraint’ of cost, time and scope or not implemented at all. Given a constrained revenue envelope post 2008, there is a need for improved project implementation. Amongst others, this calls for professional public project implementation so that NDPs become a reality.

  7. Environmental Science: 49 Science Fair Projects. Science Fair Projects Series.

    Science.gov (United States)

    Bonnet, Robert L.; Keen, G. Daniel

    This book contains 49 science fair projects designed for 6th to 9th grade students. Projects are organized by the topics of soil, ecology (projects in habitat and life cycles), pests and controls (projects in weeds and insects), recycling (projects in resources and conservation), waste products (projects in decomposition), microscopic organisms,…

  8. The random projection method

    CERN Document Server

    Vempala, Santosh S

    2005-01-01

    Random projection is a simple geometric technique for reducing the dimensionality of a set of points in Euclidean space while preserving pairwise distances approximately. The technique plays a key role in several breakthrough developments in the field of algorithms. In other cases, it provides elegant alternative proofs. The book begins with an elementary description of the technique and its basic properties. Then it develops the method in the context of applications, which are divided into three groups. The first group consists of combinatorial optimization problems such as maxcut, graph coloring, minimum multicut, graph bandwidth and VLSI layout. Presented in this context is the theory of Euclidean embeddings of graphs. The next group is machine learning problems, specifically, learning intersections of halfspaces and learning large margin hypotheses. The projection method is further refined for the latter application. The last set consists of problems inspired by information retrieval, namely, nearest neig...

  9. Project Communication in Functions, Process and Project-Oriented Industiral Companies

    Science.gov (United States)

    Samáková, Jana; Koltnerová, Kristína; Rybanský, Rudolf

    2012-12-01

    The article is focused on the project communication management. Industrial enterprises, which use project management must constantly search the new ways for improving. One of the possibilities is the change of management from a functional oriented to the projectoriented or process-oriented. Process-oriented and project-oriented companies have better project communication management during the all project life cycle. Communication in the project is a very important factor. According to the arguments of several authors, one of the biggest problem is that threaten the success of the project is just the communication. In each project is an important pillar - and that is communication. Only on the base of communication can the project move forward and achieve the target.

  10. Research Project Evaluation—Learnings from the PATHWAYS Project Experience

    Directory of Open Access Journals (Sweden)

    Aleksander Galas

    2018-05-01

    Full Text Available Background: Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project. The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project’s evaluation issues including: (1 purposes, (2 advisability, (3 tools, (4 implementation, and (5 possible benefits and presents the advantages of a continuous monitoring. Methods: Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S, Weaknesses (W, Opportunities (O, and Threats (SWOT analysis. Results: A methodology for longitudinal EU projects’ evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. Conclusions: There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  11. Using an Undergraduate Materials Research Project to Foster Multidisciplinary Teaming Skills

    Science.gov (United States)

    Newell, James A.; Cleary, Doug D.

    2004-01-01

    This paper describes the use of undergraduate materials multidisciplinary research projects as a means of addressing the growing industrial demand for graduates experienced in working in multidisciplinary teams. It includes a detailed description of a project in which a multidisciplinary team of chemical engineering and civil engineering students…

  12. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    OpenAIRE

    Tamara Gvozdenovic; Mirjana Miljanovic; Aleksandar Jegdic; Zeljko Crnogorcic

    2008-01-01

    One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviatio...

  13. Technical Description Lillgrund Wind Power Plant. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Jeppsson, Joakim; Larsen, Poul Erik; Larsson, Aake [Vattenfall Vindkraft AB, Stockholm (Sweden)

    2008-09-15

    Lillgrund offshore wind power plant comprises 48 wind turbines, each rated at 2.3 MW, bringing the total wind farm capacity to 110 MW. The Lillgrund offshore wind power plant is located in a shallow area of Oeresund, 7 km off the coast of Sweden and 7 km south from the Oeresund Bridge connecting Sweden and Denmark. An average wind speed of around 8,5 m/s at hub height, combined with a relatively low water depth of 4 to 8 meters makes it economically feasible to build here. Vattenfall Vindkraft AB is the owner and operator of Lillgrund offshore wind power plant. Lillgrund is a Swedish pilot project supported by the Swedish Energy Agency. The bidding process was completed during 2005 and the offshore power plant was constructed in the period 2006 to 2007. The wind farm was constructed on time and has now been successfully operational since December 2007. There is, however, always potential for improvement and the aim of this report has been to determine and highlight these areas. It is worth noting out that only the electrical system and the foundations are tailor made at offshore wind power plants. The wind turbines are more or less standard products with none or very limited possibilities for project specific design changes. Geotechnical investigations are expensive and it can be difficult to balance the risks as well as the benefits of this expense in the early phases of a large infrastructure project. As a whole, the geotechnical surveys at Lillgrund proved to be useful. They identified potential issues, such as the fact that extra excavation was required for two of the foundations. It also revealed the location of a small number of boulders that would have to be removed. Vattenfall requested a complete study of the electrical system for Lillgrund to be delivered with the bids. That request was not met. Instead Siemens Wind Power began a complete electrical system study after being awarded the Contract. The electrical system study was completed during the

  14. OECD Halden reactor project

    International Nuclear Information System (INIS)

    1978-01-01

    This report summarizes the activities of the OECD Halden Reactor Project for the year 1976. The main items reported on are: a) the process supervision and control which have focused on core monitoring and control, and operator-process communication; b) the fuel performance and safety behavior which have provided data and analytical descriptions of the thermal, mechanical and chemical behavior of fuel under various operating conditions; c) the reactor operations and d) the administration and finance

  15. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Tamara Gvozdenovic

    2008-03-01

    Full Text Available One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviations from the previously set quality standards. Basic processes of project quality management are: quality planning, quality assurance and quality control.

  16. 40 CFR 258.41 - Project XL Bioreactor Landfill Projects.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Project XL Bioreactor Landfill... WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Design Criteria § 258.41 Project XL Bioreactor Landfill Projects. (a) Buncombe County, North Carolina Project XL Bioreactor Landfill Requirements...

  17. Virtual projects

    DEFF Research Database (Denmark)

    Svejvig, Per; Commisso, Trine Hald

    2012-01-01

    that the best practice knowledge has not permeated sufficiently to the practice. Furthermore, the appropriate application of information and communication technology (ICT) remains a big challenge, and finally project managers are not sufficiently trained in organizing and conducting virtual projects....... The overall implications for research and practice are to acknowledge virtual project management as very different to traditional project management and to address this difference.......Virtual projects are common with global competition, market development, and not least the financial crisis forcing organizations to reduce their costs drastically. Organizations therefore have to place high importance on ways to carry out virtual projects and consider appropriate practices...

  18. Impact of promoting sustainable agriculture project on livelihood ...

    African Journals Online (AJOL)

    This study on impact assessment of Promoting Sustainable Agriculture Project ... the Fisher Index, Focused Group Discussion and descriptive statistical analysis. ... The qualitative analysis showed that 30%, 45% and 10% of men, women and ...

  19. Project management plan for Project W-320, Tank 241-C-106 sluicing. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Phillips, D.R.

    1994-07-01

    A major mission of the US Department of Energy (DOE) is the permanent disposal of Hanford Site defense wastes by utilizing safe, environmentally acceptable, and cost-effective disposal methods that meet applicable regulations. The Tank Waste Remediation System (TWRS) Program was established at the Hanford Site to manage and control activities specific to the remediation of safety watch list tanks, including high-heat-producing tanks, and for the ultimate characterization, retrieval, pretreatment, and disposal of the low- and high-level fractions of the tank waste. Project W-320, Tank 241-C-106 Sluicing, provides the methodology, equipment, utilities, and facilities necessary for retrieving the high-heat waste from single-shell tank (SST) 24-C-106. Project W-320 is a fiscal year (FY) 1993 expense-funded major project, and has a design life of 2 years. Retrieval of the waste in tank 241-C-106 will be accomplished through mobilization of the sludge into a pumpable slurry using past-practice sluicing. The waste is then transferred directly to a double-shell tank for interim storage, subsequent pretreatment, and eventual disposal. A detailed description of the management organization and responsibilities of all participants is presented in this document.

  20. Project management plan for Project W-320, Tank 241-C-106 sluicing. Revision 2

    International Nuclear Information System (INIS)

    Phillips, D.R.

    1994-07-01

    A major mission of the US Department of Energy (DOE) is the permanent disposal of Hanford Site defense wastes by utilizing safe, environmentally acceptable, and cost-effective disposal methods that meet applicable regulations. The Tank Waste Remediation System (TWRS) Program was established at the Hanford Site to manage and control activities specific to the remediation of safety watch list tanks, including high-heat-producing tanks, and for the ultimate characterization, retrieval, pretreatment, and disposal of the low- and high-level fractions of the tank waste. Project W-320, Tank 241-C-106 Sluicing, provides the methodology, equipment, utilities, and facilities necessary for retrieving the high-heat waste from single-shell tank (SST) 24-C-106. Project W-320 is a fiscal year (FY) 1993 expense-funded major project, and has a design life of 2 years. Retrieval of the waste in tank 241-C-106 will be accomplished through mobilization of the sludge into a pumpable slurry using past-practice sluicing. The waste is then transferred directly to a double-shell tank for interim storage, subsequent pretreatment, and eventual disposal. A detailed description of the management organization and responsibilities of all participants is presented in this document

  1. GRI baseline projection of U.S. energy supply and demand to 2010. 1992 edition

    International Nuclear Information System (INIS)

    Holtberg, P.D.; Woods, T.J.; Lihn, M.L.; Koklauner, A.B.

    1992-04-01

    The annual GRI baseline projection is the result of a complex modeling effort that seeks to achieve an internally consistent energy supply and demand outlook across all energy sources and end-use demand sectors. The year's projection includes the adoption of a new petroleum refinery methodology, the incorporation of a new approach to determining electric utility generating capacity heat rates, the extensive update of both the residential and commercial databases and methodologies, and the continued update of the GRI Hydrocarbon Model. The report presents a series of summary tables, sectoral breakdowns of energy demand, and the natural gas supply and price trends. The appendices include a discussion of the methodology and assumptions used to prepare the 1992 edition of the projection, an analysis of the potential for higher levels of gas demand, a description of industrial and commercial cogeneration, a description of the independent power producer projection, a comparison of the 1992 edition of the projection with previous GRI projections, and a discussion of additional data used in developing the projection

  2. Project development symposium

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    Papers were presented on the following: project evaluation; case studies - minerals; finance; applied finance; legal; manpower/industrial relations; and new technologies. Those papers on the coal industry were: mine planning for coal project development; the planning and management of a lignite exploration contract in Thailand; development of the West Cliff extended project; Ulan: a resource development; Saxonvale mine development a case study in project planning and project management; the role of marketing in the development of a new coal project; technical support for coal marketing; infrastructure development for the Ulan project; underground mine project developments; the bucketwheel excavator at Goonyella - a case study; tax aspects of mining development projects; cost of capital mining development projects; and trends in development project finance. 16 papers were abstracted separately.

  3. Project Temporalities

    DEFF Research Database (Denmark)

    Tryggestad, Kjell; Justesen, Lise; Mouritsen, Jan

    2013-01-01

    Purpose – The purpose of this paper is to explore how animals can become stakeholders in interaction with project management technologies and what happens with project temporalities when new and surprising stakeholders become part of a project and a recognized matter of concern to be taken...... into account. Design/methodology/approach – The paper is based on a qualitative case study of a project in the building industry. The authors use actor-network theory (ANT) to analyze the emergence of animal stakeholders, stakes and temporalities. Findings – The study shows how project temporalities can...... multiply in interaction with project management technologies and how conventional linear conceptions of project time may be contested with the emergence of new non-human stakeholders and temporalities. Research limitations/implications – The study draws on ANT to show how animals can become stakeholders...

  4. Understanding Applications of Project Planning and Scheduling in Construction Projects

    OpenAIRE

    AlNasseri, Hammad Abdullah

    2015-01-01

    Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholders’ needs. However, there is increasing concern about whether know-how effectively improves understanding of underlying theories of project management processes for construction organizations and their project managers. Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance, but many worldwide constru...

  5. Mirage project. Second summary progress report (Work period January to December 1984)

    International Nuclear Information System (INIS)

    Come, B.

    1985-01-01

    This report summarizes the second year of work (1984) in the CEC project MIRAGE on migration of radionuclides in the geosphere. It complements CEC reports EUR 9304 (Description of the project) and EUR 9543 (Works carried out in 1983) on the same topic

  6. Experience of Hungarian model project: 'Strengthening training for operational safety at Paks NPP'

    International Nuclear Information System (INIS)

    Kiss, I.

    1998-01-01

    Training of Operational Safety at Paks NPP is described including all the features of the project including namely: description of Paks NPP, its properties and performances; reasons for establishing Hungarian Model Project, its main goals, mentioning Hungarian and IAEA experts involved in the Project, its organization, operation, budget, current status together with its short term and long term impact

  7. REGULATORY FUNDAMENTALS FOR IMPLEMENTATION OF INFORMATION TECHNOLOGY PROJECTS IN INDUSTRY

    Directory of Open Access Journals (Sweden)

    L. V. Gubich

    2016-01-01

    Full Text Available The article provides an overview of the existing regulatory basis for the development of IIST. The features of IT projects management and a brief description of methodological recommendations on implementation of IT projects of the State scientific and technical Program «Electronic enterprise resource planning (CALS-ERP-technology» for 2011–2015 are considered.

  8. Project monitoring package (PMP) : A package for project activity monitoring

    International Nuclear Information System (INIS)

    Vyas, K.N.; Kannan, A.; Susandhi, R.; Basu, S.

    1987-01-01

    A package for preparing PERT/CPM network diagrams has been written for PDP-11/34. The program uses PLOT-10 library calls for device interfacing. The package is essentially non-interactive in nature, and reads input data in the form of activity description and duration. It calculates the critical path time and performs time scaling of the events. The report gives a brief outline of the logic used, a sample plot and tabular output for reference. An additional facility for performing project activity monitoring has also been implemented. Activity monitoring generally requires various reports such as feed back reports from various group co-ordinators, information report for project co-ordinator and brief periodical reports for management. A package 'DATATRIEVE' (DTR) on PDP-11/34 system is utilized for generating the above mentioned reports. As DTR can also use normal sequential files, an interfacing program has been written which reformats the files accepted by PERT program acceptable to DTR. Various types of reports as generated by DTR are included. However this part of the package is not transportable and can be implemented only on systems having DTR. 6 figures. (author)

  9. Project Management

    DEFF Research Database (Denmark)

    Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015.......Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015....

  10. Work plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    The primary objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that populations could have received from nuclear operations at the Hanford Site since 1944, with descriptions of uncertainties inherent in such estimates. The secondary objective is to make project records--information that HEDR staff members used to estimate radiation doses--available to the public. Preliminary dose estimates for a limited geographic area and time period, certain radionuclides, and certain populations are planned to be available in 1990; complete results are planned to be reported in 1993. Project reports and references used in the reports are available to the public in the DOE Public Reading Room in Richland, Washington. Project progress is documented in monthly reports, which are also available to the public in the DOE Public Reading Room.

  11. Experiences of project developers around CDM projects in South Africa

    International Nuclear Information System (INIS)

    Thurner, Thomas W.; Varughese, Arun

    2013-01-01

    Project developers in South Africa are puzzled with the long process of evaluating and registering their CDM projects. In addition to other obstacles, we find that South African big businesses are rather reluctant to engage in any new business activities such as CDM projects and municipalities often lack the necessary flexibility. This offers opportunities for small-scale project developers who spot the opportunities and find creative solutions to overcome these difficulties. - Highlights: • First paper analysing the experience of small project developers in South Africa. • Project developers in South Africa are puzzled with the long process. • South African big businesses are reluctant to engage in CDM projects. • Small-scale project developers spot opportunities and find creative solutions to overcome difficulties. • Also, we saw learning processes of South African administration in support of CDM projects

  12. Tri-State Synfuels Project Review: Volume 12. Fluor project status. [Proposed Henderson, Kentucky coal to gasoline plant; engineering

    Energy Technology Data Exchange (ETDEWEB)

    1982-06-01

    The purpose of this report is to document and summarize activities associated with Fluor's efforts on the Tri-State Synfuels Project. The proposed facility was to be coal-to-transport fuels facility located in Henderson, Kentucky. Tri-State Synfuels Company was participating in the project as a partner of the US Department of Energy per terms of a Cooperative Agreement resulting from DOE's synfuel's program solicitation. Fluor's initial work plan called for preliminary engineering and procurement services to the point of commitment for construction for a Sasol Fischer-Tropsch plant. Work proceeded as planned until October 1981 when results of alternative coal-to-methanol studies revealed the economic disadvantage of the Synthol design for US markets. A number of alternative process studies followed to determine the best process configuration. In January 1982 Tri-State officially announced a change from Synthol to a Methanol to Gasoline (MTG) design basis. Further evaluation and cost estimates for the MTG facility eventually led to the conclusion that, given the depressed economic outlook for alternative fuels development, the project should be terminated. Official announcement of cancellation was made on April 13, 1982. At the time of project cancellation, Fluor had completed significant portions of the preliminary engineering effort. Included in this report are descriptions and summaries of Fluor's work during this project. In addition location of key project data and materials is identified and status reports for each operation are presented.

  13. Projection Mapping User Interface for Disabled People.

    Science.gov (United States)

    Gelšvartas, Julius; Simutis, Rimvydas; Maskeliūnas, Rytis

    2018-01-01

    Difficulty in communicating is one of the key challenges for people suffering from severe motor and speech disabilities. Often such person can communicate and interact with the environment only using assistive technologies. This paper presents a multifunctional user interface designed to improve communication efficiency and person independence. The main component of this interface is a projection mapping technique used to highlight objects in the environment. Projection mapping makes it possible to create a natural augmented reality information presentation method. The user interface combines a depth sensor and a projector to create camera-projector system. We provide a detailed description of camera-projector system calibration procedure. The described system performs tabletop object detection and automatic projection mapping. Multiple user input modalities have been integrated into the multifunctional user interface. Such system can be adapted to the needs of people with various disabilities.

  14. Projection Mapping User Interface for Disabled People

    Science.gov (United States)

    Simutis, Rimvydas; Maskeliūnas, Rytis

    2018-01-01

    Difficulty in communicating is one of the key challenges for people suffering from severe motor and speech disabilities. Often such person can communicate and interact with the environment only using assistive technologies. This paper presents a multifunctional user interface designed to improve communication efficiency and person independence. The main component of this interface is a projection mapping technique used to highlight objects in the environment. Projection mapping makes it possible to create a natural augmented reality information presentation method. The user interface combines a depth sensor and a projector to create camera-projector system. We provide a detailed description of camera-projector system calibration procedure. The described system performs tabletop object detection and automatic projection mapping. Multiple user input modalities have been integrated into the multifunctional user interface. Such system can be adapted to the needs of people with various disabilities. PMID:29686827

  15. Buddy-Tutor Project. Hilo Intermediate School. Final Report, March-July, 1974.

    Science.gov (United States)

    Hawaii Univ., Honolulu. Social Welfare Development and Research Center.

    An operational description of the 1973-74 Buddy-Tutor Project at Hilo Intermediate School in Hilo, Hawaii and an evaluative assessment of its outcome with statistical treatment of the data is provided in this report. This project is an exploratory behavioral intervention program for educationally deprived students and focuses its efforts on the…

  16. MATCHING CONFIGURATIONS PROJECTS OF COOPERATIVE MILK COLLECTION PROJECT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    Анатолій Миколайович ТРИГУБА

    2017-03-01

    Full Text Available The condition analysis of dairy farming is done and the reasons for its degradation are revealed. The need of technologically integrated production systems projects, harvesting, and processing of milk are substantiated. A scientific methodology and the method of project design of milk provision cooperative coordination in the community of the project environment, which are based on systematic-evaluative approach and simulation are proposed. The criterion for the definition of rational parameters of objects configuration for milk provision cooperative projects in the community system is the maximum value of their product. The monetary functioning assessment of the configuration object of cooperative milk provision projects in the community is done. On the basis of the proposed method, we performed the coordination of project configuration of milk provision cooperative with the project environment of territory Zabolotsi community in Brody district of Lviv region.

  17. Project 2010 Bible

    CERN Document Server

    Marmel, Elaine

    2010-01-01

    A comprehensive reference on the latest version of the leading enterprise project management software: Microsoft Project 2010. Microsoft Project allows users to manage business activities effectively by sharing project information, performing modeling and scenario analyses, standardizizing reporting processes, and more. This soup-to-nuts reference covers both the professional and standard versions of the latest iteration of Microsoft Project, as well as Project Server, so that you can efficiently manage your business projects. Veteran author Elaine Marmel begins with an overview of project man

  18. A Descriptive Account of an Inter-Professional Collaborative Leadership Project

    Directory of Open Access Journals (Sweden)

    Maura MacPhee

    2014-09-01

    Full Text Available A collaborative project between an academic healthcare faculty and a professional development director resulted in the design, delivery and evaluation of an inter-professional collaborative leadership workshop with ongoing leadership development activities. The workshop attendees were five inter-professional teams from one large, urban cancer care center in Taipei, Taiwan. The workshop included didactic instruction complemented with team discussions and interactive exercises. Continued practice was encouraged, such as appreciative inquiry exercises and rotated team leadership. Evaluation involved the use of a cross-culturally validated collaborative practice tool and follow-up interviews and focus groups. Although the formal workshop was a 1-day session, continued organizational support and systematic approaches to collaborative leadership practice in clinical settings were necessary components for transfer of learning from the workshop to real life. This paper will include an overview of the foundational leadership concepts covered in the workshop. The instructional strategies, evaluation methods and outcomes will be discussed. The limitations and strengths of this collaborative leadership project will be provided, as well as future plans for a collaborative leadership development program.

  19. Define Project

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas

    2005-01-01

    "Project" is a key concept in IS management. The word is frequently used in textbooks and standards. Yet we seldom find a precise definition of the concept. This paper discusses how to define the concept of a project. The proposed definition covers both heavily formalized projects and informally...... organized, agile projects. Based on the proposed definition popular existing definitions are discussed....

  20. Evaluation of double drop beads pavement edge lines : SPR project description.

    Science.gov (United States)

    2009-01-01

    In UTCA projects 01465 and 04405, the retroreflectivities and the life cycle costs were measured and compared for standard Alabama Department of Transportation (ALDOT) thermoplastic edge : stripes that contained only one size of retroreflective beads...

  1. Project Management Methods in Projects Co-financed by EU Funds

    OpenAIRE

    Kostalova, Jana; Tetrevova, Libena; Patak, Michal

    2017-01-01

    This paper deals with the management of projects co-financed by European Union funds (structural funds and the Cohesion Fund) in the Czech Republic (EU projects). The authors aimed to analyze and assess the scope of familiarity with basic project management methods and their application within the implementation of EU projects in the Czech Republic in the Programming Period 2007–2013. Based on a questionnaire survey of EU project organisers, the authors evaluate their attitudes to project man...

  2. Subject description of non-fiction literature for adults: expert-theoretical basis for the realisation of the »Hidden Treasure« research project

    Directory of Open Access Journals (Sweden)

    Andrej Pogorelec

    2004-01-01

    Full Text Available Library users searching through non-fiction library material by subject in online OPACs, expect to be able to search fiction by subject as well. The research project Skriti zaklad (Hidden Treasure was launched in 2002 and was aimed at improving the current subject description of non-juvenile literary works in Slovenian libraries. An overview of the current practice of fiction subject description in Slovenian libraries revealed that Universal Decimal Classification class numbers are usually assigned, while subject headings or abstracts are scarce. The article presents a model designed for subject description of fiction, with special emphasis on subject headings, for the Bežigrad High School Library and the Bežigrad Public Library (both in Ljubljana.

  3. The impact of project marketing on the projects finality

    Directory of Open Access Journals (Sweden)

    Oxana SAVCIUC

    2015-06-01

    Full Text Available In the last years we assist at the level of the Republic of Moldova and also at international level at a trend to offer financial support with a special focus on project-based funding. Once with the appearance and development of the project concept, other related concepts are being developed such as project management or newly, we can also speak about the projects marketing. Until recently, the product marketing was intensely discussed; concepts such as services marketing appeared afterwards, but also the specific marketing for various branches, such as agromarketing, political marketing, etc. Given that fact that the projects are a product / service itself, at the moment, more and more often projects marketing is discussed.

  4. Energy research information system projects report, volume 5, number 1

    Science.gov (United States)

    Johnson, J.; Schillinger, L.

    1980-07-01

    The system (ERIS) provides an inventory of the energy related programs and research activities from 1974 to the present in the states of Montana, Nebraska, North Dakota, South Dakota and Wyoming. Areas of research covered include coal, reclamation, water resources, environmental impacts, socioeconomic impacts, energy conversion, mining methodology, petroleum, natural gas, oilshale, renewable energy resources, nuclear energy, energy conservation and land use. Each project description lists title, investigator(s), research institution, sponsor, funding, time frame, location, a descriptive abstract of the research and title reports and/or publications generated by the research. All projects are indexed by location, personal names, organizations and subject keywords.

  5. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    Science.gov (United States)

    Alagba, Tonye J.

    Oil and gas drilling projects are the primary means by which oil companies recover large volumes of commercially available hydrocarbons from deep reservoirs. These types of projects are complex in nature, involving management of multiple stakeholder interfaces, multidisciplinary personnel, complex contractor relationships, and turbulent environmental and market conditions, necessitating the application of proven project management best practices and critical success factors (CSFs) to achieve success. Although there is some practitioner oriented literature on project management CSFs for drilling projects, none of these is based on empirical evidence, from research. In addition, the literature has reported alarming rates of oil and gas drilling project failure, which is attributable not to technical factors, but to failure of project management. The aim of this quantitative correlational study therefore, was to discover an empirically verified list of project management CSFs, which consistent application leads to successful implementation of oil and gas drilling projects. The study collected survey data online, from a random sample of 127 oil and gas drilling personnel who were members of LinkedIn's online community "Drilling Supervisors, Managers, and Engineers". The results of the study indicated that 10 project management factors are individually related to project success of oil and gas drilling projects. These 10 CSFs are namely; Project mission, Top management support, Project schedule/plan, Client consultation, Personnel, Technical tasks, Client acceptance, Monitoring and feedback, Communication, and Troubleshooting. In addition, the study found that the relationships between the 10 CSFs and drilling project success is unaffected by participant and project demographics---role of project personnel, and project location. The significance of these findings are both practical, and theoretical. Practically, application of an empirically verified CSFs list to oil

  6. A Correlational Study Assessing the Relationships among Information Technology Project Complexity, Project Complication, and Project Success

    Science.gov (United States)

    Williamson, David J.

    2011-01-01

    The specific problem addressed in this study was the low success rate of information technology (IT) projects in the U.S. Due to the abstract nature and inherent complexity of software development, IT projects are among the most complex projects encountered. Most existing schools of project management theory are based on the rational systems…

  7. The Effectiveness of Project-based E-learning to Improve Ict Literacy

    OpenAIRE

    Eliana, E. D. S; Senam, Senam; Wilujeng, I; Jumadi, Jumadi

    2016-01-01

    This study aims to reveal the effectiveness of science teaching based on project-based learning to improve ICT literacy learners in the junior high school with the category of high, medium and low. This research uses descriptive method to describe the students’ equipness of ICT literacy in the science learning based on the project-based learning that is integrated with e-learning. All of the population in this study are junior high school of curriculum pilot project in 2013 in Singkawang. The...

  8. Description of Website for the OECD-IAEA Paks Fuel Project

    International Nuclear Information System (INIS)

    Szabo, Emese; Hozer, Zoltan; Nagy, Imre

    2010-01-01

    The first version of the database for the OECD-IAEA PAKS FUEL PROJECT has been collected and it is available on the following password protected website: http://nagy.aeki.kfki.hu Several modifications have been made and new items added according to the minutes of the 1st meeting held in Budapest on 30-31 January 2005

  9. Budgetary Approach to Project Management by Percentage of Completion Method

    Directory of Open Access Journals (Sweden)

    Leszek Borowiec

    2011-07-01

    Full Text Available Efficient and effective project management process is made possible by the use of methods and techniques of project management. The aim of this paper is to present the problems of project management by using Percentage of Completion method. The research material was gathered based on the experience in implementing this method by the Johnson Controls International Company. The article attempts to demonstrate the validity of the thesis that the POC project management method, allows for effective implementation and monitoring of the project and thus is an effective tool in the managing of companies which exploit the budgetary approach. The study presents planning process of basic parameters affecting the effectiveness of the project (such as costs, revenue, margin and characterized how the primary measurements used to evaluate it. The present theme is illustrating by numerous examples for showing the essence of the raised problems and the results are presenting by using descriptive methods, graphical and tabular.

  10. Management and marketing of sporting events: Nike Premier Cup Project

    OpenAIRE

    Nedbal, Jakub

    2008-01-01

    Title: Management and marketing ofsporting events: Nike Premier Cup project Points of thesis: Publish the Nike Premier Cup promotion campaign project and point out improvement possibilities for upcoming years based on analysis ofpast and present state. Methods: Data will be obtained by interview, observation, description analysis and SWOT analysis Results: Promotion campaign, improvement possibilities, final day schedule Keywords: SWOT analysis, promotion, management, marketing, Nike Premier ...

  11. A church with character and its social capital for projects amongst the poor

    Directory of Open Access Journals (Sweden)

    Hendrik J.C. Pieterse

    2011-11-01

    Full Text Available In this article I present a theoretical framework for my argument that specific congregations which are renewed to address the current culture and context, according to the vision presented by Professor T.F.J. Dreyer, are competent to generate projects directed to the poor and humble as social capital. The problem addressed in the article, also phrased as the research question, is: what is the nature and diversity of care in the form of projects as social capital amongst the poor in renewed congregations as it emerges from the sermons on Matthew 25:31−46? The goal of the grounded theory analysis of sermons on this text in a research cycle of selective coding, collected from renewed congregations, will be the identification of projects, types of projects, and their properties. I discuss the idea of local theologies as a motivation of contextual religious action by the congregation in projects amongst the poor, provide a description of poverty in South Africa; show the role of religious faith communities in addressing poverty, followed by conceptualisation of social capital in projects of congregations, and lastly I give a description of two examples of projects thus far discovered in analysed sermons.

  12. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Harboe, Peter Georg; Riis, Eva

    2016-01-01

    such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case...

  13. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Riis, Eva; Harboe, Peter Georg

    2016-01-01

    integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems...

  14. ALIGNMENT BETWEEN THE TYPES OF PROJECTS AND SKILLS PROJECT MANAGEMENT IN THE AES SUL DISTRIBUIDORA GAÚCHA DE ENERGIA S.A

    Directory of Open Access Journals (Sweden)

    Greice de Bem Noro

    2011-10-01

    Full Text Available The pursuit of excellence and new markets and customers has driven companies to build methods to reach goals and improve their strategies and competitive advantages. Therefore, the project management (PM has played a key role in the organizations to adjust deadlines, organizing methods and decision-making. Although many companies already use the PM as resource, this research attempt to contribute to increase the area trough the debate about alignment of companies projects types with the choice of the leader, in line with their skills. The study was developed in the AES Sul Distribuidora Gaúcha de Energia SA (AES Sul and examined how the alignment of the types of projects and management competencies can add value to the organization. The methodological procedure is classified as qualitative, quantitative and descriptive, conducted through a case study. The main results show the need for adjustments between the essential skills and AES Sul types of projects, beyond find some gaps regarding the leaders competencies.

  15. Oil field rejuvenation work starts at 14 project sites

    International Nuclear Information System (INIS)

    Petzet, G.A.

    1992-01-01

    This paper reports that the U.S. Department of Energy and oil and gas companies have released more information about a joint effort to rejuvenate aging U.S. oil fields in danger of abandonment. Work is starting on 14 demonstration projects that could recover 21 million bbl of oil from the fluvial dominated deltaic (FDD) reservoirs in which they are conducted. Wider application of the same techniques, if they are successful, could results in addition of 6.3 billion bbl of reserves, nearly 25% of U.S. crude oil reserves. A multidisciplinary team approach is to be used, with as many as 11 operators, service companies, universities, or state agencies participating in each project. All of the projects will culminate in extensive technology transfer activities. Here are descriptions of the projects gleaned from public abstracts provided by the DOE contractors

  16. Trevino Project: a fast-track approach for a small construction project

    International Nuclear Information System (INIS)

    Schick, C.J.; Lynn, N.S.

    1982-01-01

    The approach to a construction project can vary according to the size, location, and degree of difficulty associated with the project. This paper deals with one approach that can be taken to a small construction project, the fast-track approach. A small construction project can be defined as a project having less than $20 million capital cost or a project with a low degree of difficulty. This approach is very applicable to in-situ leaching uranium projects, small precious metal operations, etc. The approach to the small project is that of fast-tracking the project in order to minimize the time over which capital expenditure occurs and also to reduce the indirect costs of field expense, construction supplies, construction equipment, etc. In order to fast-track a project it is necessary to do a very precise job on the preliminary phases of the project such as preliminary engineering, plant site location, environmental permits, etc. 2 figures, 2 tables

  17. PROJECT - RESOURCE MANAGEMENT OF INNOVATIONS IN EDUCATION: ANTHROPOLOGICAL PROJECTION

    Directory of Open Access Journals (Sweden)

    Galina Aleksandrovna Ignat’eva

    2015-08-01

    Full Text Available The purpose of the research was to denote a way to solve the problem of education mana-gement ΄s insufficient efficiency considered from the point of view of education opportunities to influence on the formation of mechanisms for sustainable development of society as a whole and its educational component. The concept «project-resource management of innovation in education» regarded on the basis of the anthropological project-transforming paradigm. Conceptually-categorical context presented by conceptual cluster composed of coordinated concepts «project», «resource», «educational reality», «organizational-resource potential», «project commonality». In the theoretical part of the study on the basis of analysis of the normative and exploratory approaches to educational innovations organization and management it was established the search approach ΄s leading role in the methodological substantiation of project-resource management. The study have indicated that in the presence of variable models of innovation management in education, corresponding to various predictive models of continuing education post-industrial society, project-resource management is an universal mechanism for the transition from separate innovation΄s precedents to the an authentic reality of innovative education. In the technological part of the study the main concern was to submit the project-resource management by the management goal’s system, each of which includes the specific management actions, projected results and the organizational forms. The project-resource management ΄s professional – activity context of the study showed evolution of managerial positions: an effective performer – an effective leader – strategist, implemented during the transition from directly directive management to the project management and further to the project-resource management. Based on the findings identified the key factors of initiatively-problem projects

  18. Halifax Lateral Pipeline Project : comprehensive study report

    International Nuclear Information System (INIS)

    1998-12-01

    The National Energy Board has requested the preparation of a comprehensive study report (CSR) for the proposed Halifax Lateral Pipeline Project in support of Maritimes and Northeast Pipeline Company's proposal to construct the lateral pipeline to transport natural gas produced in offshore Nova Scotia to the Tufts Cove electric generating station in the Halifax Regional Municipality. The project will also enhance the access of natural gas to potential markets located along the pipeline route. This CSR was prepared according to guidelines of the Canadian Environmental Assessment Agency. The report presents: (1) an overview of the project, (2) a summary of the regulatory requirements for assessment, (3) a description of the environmental assessment and regulatory process to date, (4) a summary of the predicted residual environmental and socio-economic effects associated with the project, and (5) a summary of the public consultation process. The environmental and socio-economic assessment focused on these eleven issues: groundwater resources, surface water resources, wetlands, soils, air quality, fish habitat, rare herpetiles, mammals, avifauna, rare plants and archaeological heritage resources. The report identified potential interactions between the project and valued socio-economic and environmental components. These were addressed in combination with recommended mitigative measures to reduce potential adverse effects. It was concluded that the overall environmental effects from the proposed project are likely to be minimal and can be effectively managed with good environmental management methods. 14 refs., 5 tabs., 5 figs., 2 appendices

  19. PACTEL OECD project planning (PACO). PACTEL OECD project planning

    Energy Technology Data Exchange (ETDEWEB)

    Kouhia, V.; Purhonen, H. [Lappeenranta University of Technology (Finland)

    2004-07-01

    OECD launched the SETH project to investigate issues relevant for accident prevention and management and to ensure the existence of integral thermal hydraulic test facilities. The facilities included in the SETH project are PKL from Germany and PANDA from Switzerland. At the early stages of the SETH project an idea was raised to exploit the PACTEL facility in a similar OECD project. Without any external funding the analytical work in the required extent would not be possible within Lappeenranta University of Technology, the party responsible of operating PACTEL. This fact directed the PACO project proposal to be conducted for the SAFIR programme. The aim of the PACO project is to prepare a project proposal to OECD of a PACTEL related project. To attain this objective some preliminary analyses have to be performed to ensure the relevancy of the proposed topic. The low power situation, i.e. midloop state was chosen to be the topic in the PACO studies and project planning basis. The plan is to use PACTEL to examine vertical steam generator behaviour during the midloop operation and the following loss of residual heat removal system transient. Such a possibility is acknowledged with special alterations to PACTEL. The APROS code version 5.04.07 was selected as a tool for the preanalyses. The virtual simulation of the chosen experimental situation would give a preconception on the phenomena to be expected and the progression of the transient. Originally the PACO project was planned to continue only for a few months, ending up with the project proposal to OECD during the summer time 2004. During the pre-calculation process it became obvious that the time expected was not enough to establish good pre-calculation results. The reasons for this relates to time used to learn and adapt the use of the chosen code, improvements and corrections in modelling as well as the code ability to manage the special conditions defined for the project topic. Another aspect on completing a

  20. Project manager attributes influencing project success in the South ...

    African Journals Online (AJOL)

    success criteria for building projects in Ghana and concluded that the “current and ... qualifications, profession, leadership style and project team ... and expectations of project management competence between ... 1.d. Sense of teamwork ...

  1. Microsoft project

    OpenAIRE

    Markić, Lucija; Mandušić, Dubravka; Grbavac, Vitomir

    2005-01-01

    Microsoft Project je alat čije su prednosti u svakodnevnom radu nezamjenjive. Pomoću Microsoft Projecta omogućeno je upravljanje resursima, stvaranje izvještaja o projektima u vremenu, te analize različitih scenarija. Pojavljuje u tri verzije: Microsoft Project Professional, Microsoft Project Server i Microsoft Project Server Client Access Licenses. Upravo je trend da suvremeni poslovni ljudi zadatke povjeravaju Microsoft Projectu jer on znatno povećava produktivnost rada. Te prednos...

  2. Project stakeholder management

    CERN Document Server

    Eskerod, Pernille

    2013-01-01

    Carrying out a project as planned is not a guarantee for success. Projects may fail because project management does not take the requirements, wishes and concerns of stakeholders sufficiently into account. Projects can only be successful though contributions from stakeholders. And in the end, it is the stakeholders that evaluate whether they find that the project is a success. To manage stakeholders effectively, you need to know your stakeholders, their behaviours and attitudes towards the project. In Project Stakeholder Management, the authors give guidance on how to adopt an analytical and s

  3. Projection Mapping User Interface for Disabled People

    Directory of Open Access Journals (Sweden)

    Julius Gelšvartas

    2018-01-01

    Full Text Available Difficulty in communicating is one of the key challenges for people suffering from severe motor and speech disabilities. Often such person can communicate and interact with the environment only using assistive technologies. This paper presents a multifunctional user interface designed to improve communication efficiency and person independence. The main component of this interface is a projection mapping technique used to highlight objects in the environment. Projection mapping makes it possible to create a natural augmented reality information presentation method. The user interface combines a depth sensor and a projector to create camera-projector system. We provide a detailed description of camera-projector system calibration procedure. The described system performs tabletop object detection and automatic projection mapping. Multiple user input modalities have been integrated into the multifunctional user interface. Such system can be adapted to the needs of people with various disabilities.

  4. Project Half Double

    DEFF Research Database (Denmark)

    Svejvig, Per; Gerstrøm, Anna; Frederiksen, Signe Hedeboe

    The Half Double mission: Project Half Double has a clear mission. We want to succeed in finding a project methodology that can increase the success rate of our projects while increasing the development speed of new products and services. We are convinced that by doing so we can strengthen...... the competitiveness of Denmark and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “Projects in half the time with double the impact” where projects in half the time should be understood as half the time to impact (benefit realization, effect is achieved......) and not as half the time for project execution. The Half Double project journey: It all began in May 2013 when we asked ourselves: How do we create a new and radical project paradigm that can create successful projects? Today we are a movement of hundreds of passionate project people, and it grows larger...

  5. Web Project Management

    OpenAIRE

    Suralkar, Sunita; Joshi, Nilambari; Meshram, B B

    2013-01-01

    This paper describes about the need for Web project management, fundamentals of project management for web projects: what it is, why projects go wrong, and what's different about web projects. We also discuss Cost Estimation Techniques based on Size Metrics. Though Web project development is similar to traditional software development applications, the special characteristics of Web Application development requires adaption of many software engineering approaches or even development of comple...

  6. Project Documentation as a Risk for Public Projects

    Directory of Open Access Journals (Sweden)

    Vladěna Štěpánková

    2015-08-01

    Full Text Available Purpose of the article: The paper presents the different methodologies used for creating documentation and focuses on public projects and their requirements for this documentation. Since documentation is also incorporated in the overall planning of the project and its duration is estimated using expert qualified estimate, can any change in this documentation lead to project delays, or increase its cost as a result of consuming administration, and therefore the documentation is seen as a risk, which may threaten the project as a public contract by which a company trying to achieve and obtains it, and generally any project. Methodology/methods: There are used methods of obtaining information in this paper. These are mainly structured interviews in combination with a brainstorming, furthermore also been used questionnaire for companies dealing with public procurement. As a data processing program was used MS Excel and basic statistical methods based on regression analysis. Scientific aim: The article deals with the construction market in the Czech Republic and examines the impact of changes in project documentation of public projects on their turnover. Findings: In this paper we summarize the advantages and disadvantages of having project documentation. In the case of public contracts and changes in legislation it is necessary to focus on creating documentation in advance, follow the new requirements and try to reach them in the shortest possible time. Conclusions: The paper concludes with recommendations on how to proceed, if these changes and how to reduce costs, which may cause the risk of documentation.

  7. 33 CFR 337.10 - Supervision of Federal projects.

    Science.gov (United States)

    2010-07-01

    ... plans and description of the project as expressed in the SOF or ROD. Conditions and/or limitations... aware of their responsibilities for compliance with the terms and conditions of state certifications and other conditions expressed in the SOF or ROD. ...

  8. Watchdog Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories, Inc., Pullman, WA (United States); Campbell, Jack [CenterPoint Energy Houston Electric, TX (United States); Hadley, Mark [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-12-30

    The Watchdog Project completed 100% of the project Statement of Project Objective (SOPO). The Watchdog project was a very aggressive project looking to accomplish commercialization of technology that had never been commercialized, as a result it took six years to complete not the original three that were planned. No additional federal funds were requested from the original proposal and SEL contributed the additional cost share required to complete the project. The result of the Watchdog Project is the world’s first industrial rated Software Defined Network (SDN) switch commercially available. This technology achieved the SOPOO and DOE Roadmap goals to have strong network access control, improve reliability and network performance, and give the asset owner the ability to minimize attack surface before and during an attack. The Watchdog project is an alliance between CenterPoint Energy Houston Electric, Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. PNNL performs basic and applied research to deliver energy, environmental, and national security for our nation. CenterPoint Energy is the third largest publicly traded natural gas delivery company in the U.S and third largest combined electricity and natural gas delivery company. The Watchdog Project efforts were combined with the SDN Project efforts to produce the entire SDN system solution for the critical infrastructure. The Watchdog project addresses Topic Area of Interest 5: Secure Communications, for the DEFOA- 0000359 by protecting the control system local area network itself and the communications coming from and going to the electronic devices on the local network. Local area networks usually are not routed and have little or no filtering capabilities. Combine this with the fact control system protocols are designed with inherent trust the control

  9. Influence of organizational and project cultures on project success

    Directory of Open Access Journals (Sweden)

    Berdykulova G. M.

    2017-10-01

    Full Text Available the article is dedicated to studying the influence of organizational and project cultures on effective project management of the company by knowledge systematization and the comparative analysis of world companies’ practice that allowed to reveal the main factors and criteria of projects success and negative influence of organizational culture on the project; key aspects of corporate culture and cultural integration under the conditions of globalization.

  10. Pac-Rim LNG project : final project report specifications

    International Nuclear Information System (INIS)

    1996-01-01

    PAC-RIM LNG Inc. has submitted a proposal to the British Columbia Environmental Assessment Office, to develop a liquefied natural gas project which would purchase pipeline quality natural gas from sources in northeast British Columbia and Alberta and transport it via a dedicated pipeline system to a LNG processing plant on tidewater on the Pacific coast. The project would include storage and processing facilities and a marine loading terminal. This document sets out the final project report specifications prepared by the Project Committee on the basis of input received from the public, First Nations and federal, provincial and local governments

  11. Does Lean & Agile Project Management Help Coping with Project Complexity?

    NARCIS (Netherlands)

    Jalali Sohi, A.; Hertogh, M.J.C.M.; Bosch-Rekveldt, M.G.C.; Blom, R.; Serpell, A.; Ferrada, X.

    2016-01-01

    Still, projects in the construction sector are delivered with time delays and cost overruns. One of the reasons for poor performance was assigned to project complexity. A combination of lean construction and agile project management are hypothesized as a possible solution to cope with project

  12. Rapid Response Risk Assessment in New Project Development

    Science.gov (United States)

    Graber, Robert R.

    2010-01-01

    A capability for rapidly performing quantitative risk assessments has been developed by JSC Safety and Mission Assurance for use on project design trade studies early in the project life cycle, i.e., concept development through preliminary design phases. A risk assessment tool set has been developed consisting of interactive and integrated software modules that allow a user/project designer to assess the impact of alternative design or programmatic options on the probability of mission success or other risk metrics. The risk and design trade space includes interactive options for selecting parameters and/or metrics for numerous design characteristics including component reliability characteristics, functional redundancy levels, item or system technology readiness levels, and mission event characteristics. This capability is intended for use on any project or system development with a defined mission, and an example project will used for demonstration and descriptive purposes, e.g., landing a robot on the moon. The effects of various alternative design considerations and their impact of these decisions on mission success (or failure) can be measured in real time on a personal computer. This capability provides a high degree of efficiency for quickly providing information in NASA s evolving risk-based decision environment

  13. Projection of greenhouse gas emissions - 2005 to 2030

    International Nuclear Information System (INIS)

    Illerup, J.B.; Nielsen, Ole-Kenneth; Winther, Morten; Hjort Mikekkelsen, M.; Lyck, E.; Nielsen, Malene; Hoffmann, L.; Gyldenkaerne, S.; Thomsen, Marianne

    2007-01-01

    This report contains a description of models and background data for projection of CO 2 , CH 4 , N 2 O, HFCs, PFCs and SF 6 for Denmark. The emissions are projected to 2030 using basic scenarios together with the expected results of a few individual policy measures. Official Danish forecasts of activity rates are used in the models for those sectors for which the forecasts are available, i.e. the latest official forecast from the Danish Energy Authority. The emission factors refer to international guidelines and some are country-specific and refer to Danish legislation, Danish research reports or calculations based on emission data from a considerable number of plants. The projection models are based on the same structure and method as the Danish emission inventories in order to ensure consistency. (au)

  14. Projection of greenhouse gas emissions 2009 to 2030

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Ole-Kenneth; Winther, M.; Hjorth Mikkelsen, M.; Gyldenkaerne, S.; Lyck, E.; Plejdrup, M.; Hoffmann, L.; Thomsen, M.; Hjelgaard, K.; Fauser, P.

    2010-09-15

    This report contains a description of models, background data and projections of CO{sub 2}, CH{sub 4}, N{sub 2}O, HFCs, PFCs and SF{sub 6} for Denmark. The emissions are projected to 2030 using basic scenarios together with the expected results of a few individual policy measures. Official Danish forecasts of activity rates are used in the models for those sectors for which the forecasts are available, i.e. the latest official forecast from the Danish Energy Agency. The emission factors refer to international guidelines and some are country-specific and refer to Danish legislation, Danish research reports or calculations based on emission data from a considerable number of plants. The projection models are based on the same structure and method as the Danish emission inventories in order to ensure consistency. (Author)

  15. Modern project-management

    CERN Multimedia

    CERN. Geneva

    2003-01-01

    This lecture will focus on the following issues: - The current state of the art in Project Management, especially the integration of Project Management with general management activities, and the integrated view of resources allocation. - Overview of the project life cycle, the phases and the deliverables - Necessity and limits of planning in a research environment - Organizational aspects of the projects the roles of the stakeholders - How to get the resources when they are needed - Risk Management in Projects - Earned value - How to keep a project on track (schedule and budget) - Management of the suppliers - Closing of the project

  16. Campaign to counter a deteriorating consumer market: Philip Morris's Project Sunrise.

    Science.gov (United States)

    Givel, M

    2013-02-01

    From 1997 to 2000, Philip Morris implemented Project Sunrise. This paper discusses the impact of this project on national and Philip Morris's cigarette unit sales, public opinion about smoking and secondhand tobacco smoke, and national prevalence trends for tobacco use. A qualitative archival content analysis of Project Sunrise from 1997 to 2000, and a descriptive statistical analysis of cigarette unit sales and operating profits, acceptability of smoking and secondhand tobacco smoke, and national prevalence trends for tobacco use from 1996 to 2006. Qualitative data sources related to Project Sunrise found on WebCat, Pubmed.com, LexisNexis Academic and Philip Morris's website, and archived tobacco industry documents were analysed using NVivo Version 9.0. A descriptive statistical analysis of cigarette unit sales, public opinion about smoking and secondhand tobacco smoke, and national prevalence trends for tobacco use was undertaken. Project Sunrise was a high-level strategic corporate plan to maintain profits that included four possible scenarios resulting in seven interwoven strategies. However, national prevalence rates for tobacco use declined, sales of national and Philip Morris cigarettes declined, operating profits remained at substantially lower levels after 2000 from 2001 to 2006, and a large majority of Americans agreed that there were significant health dangers associated with smoking and secondhand tobacco smoke. The impact of Project Sunrise, including countering the anti-tobacco movement, was less than successful in the USA. Copyright © 2012 The Royal Society for Public Health. Published by Elsevier Ltd. All rights reserved.

  17. Technology projects for characterization--monitoring of volatile organic compounds (VOCs)

    Energy Technology Data Exchange (ETDEWEB)

    Junk, G.A.; Haas, W.J. Jr.

    1992-07-01

    One hundred thirty technology project titles related to the characterization of volatile organic compounds (VOCs) at an arid site are listed alphabetically by first contact person in a master compilation that includes phone numbers, addresses, keywords, and short descriptions. Separate tables are presented for 62 field-demonstrated, 36 laboratory-demonstrated, and 35 developing technology projects. The technology projects in each of these three categories are also prioritized in separate summary tables. Additional tables are presented for a number of other categorizations of the technology projects: In Situ; Fiberoptic; Mass Spectrometer; Optical Spectroscopy; Raman or SERS; Ion Mobility or Acoustic; Associated; and Commercial. Four lists of contact person names are provided so details concerning the projects that deal with sampling, and VOCs in gases, waters, and soils (sediments) can be obtained. Finally, seven wide-ranging conclusions based on observations and experiences during this work are presented.

  18. Technology projects for characterization--monitoring of volatile organic compounds (VOCs)

    International Nuclear Information System (INIS)

    Junk, G.A.; Haas, W.J. Jr.

    1992-07-01

    One hundred thirty technology project titles related to the characterization of volatile organic compounds (VOCs) at an arid site are listed alphabetically by first contact person in a master compilation that includes phone numbers, addresses, keywords, and short descriptions. Separate tables are presented for 62 field-demonstrated, 36 laboratory-demonstrated, and 35 developing technology projects. The technology projects in each of these three categories are also prioritized in separate summary tables. Additional tables are presented for a number of other categorizations of the technology projects: In Situ; Fiberoptic; Mass Spectrometer; Optical Spectroscopy; Raman or SERS; Ion Mobility or Acoustic; Associated; and Commercial. Four lists of contact person names are provided so details concerning the projects that deal with sampling, and VOCs in gases, waters, and soils (sediments) can be obtained. Finally, seven wide-ranging conclusions based on observations and experiences during this work are presented

  19. From risk management to uncertainty management: a significant change in project management

    Institute of Scientific and Technical Information of China (English)

    LI Gui-jun; ZHANG Yue-song

    2006-01-01

    Starting with the meanings of the terms "risk" and "uncertainty,"" he paper compares uncertainty management with risk management in project management. We bring some doubt to the use of "risk" and "uncertainty" interchangeably in project management and deem their scope, methods, responses, monitoring and controlling should be different too. Illustrations are given covering terminology, description, and treatment from different perspectives of uncertainty management and risk management. Furthermore, the paper retains that project risk management (PRM) processes might be modified to facilitate an uncertainty management perspective,and we support that project uncertainty management (PUM) can enlarge its contribution to improving project management performance, which will result in a significant change in emphasis compared with most risk management.

  20. Application for approval of the Cold Lake Expansion Project: volume 2: environmental impact assessment: Part 1: biophysical and resource use assessment. Part 2: impact model descriptions

    International Nuclear Information System (INIS)

    Green, J.; Eccles, R.; Hegmann, G.; Morrison, L.; Salter, R.; van Egmond, T.; Vonk, P.; Ash, G.; Crowther, R.; Dance, T.; Edwards, W.; Veldman, W.

    1997-02-01

    An environmental assessment of the Cold Lake Expansion Project has been conducted to identify major issues of concern by public and government agencies, to determine means to eliminate or reduce those impacts, and to recommend any further efforts required to obtain missing information or monitor impacts. Volume 2 of the environmental impact assessment is divided into two parts. Part 1 (biophysical and resource use assessment) constitutes the primary environmental impact assessment document for the Cold Lake expansion project. It includes technical support documentation in regard to: (1) an assessment of noise impacts, (2) an assessment of greenhouse gas emissions, (3) a conceptual conservation and reclamation plan, (4) a historical resource impact assessment, and (5) a description of effects of oil spills on fish. Part 2 (impact model description) serves a reference document for part 1. It describes the approach taken in developing and assessing the impact models, discusses proposed methods for mitigation and management of residual impacts, and the recommended monitoring requirements for each of the major resource disciplines. The impact models describe the specific pathways through which impacts will occur as a result of interactions between project-related activities and important environmental components. 476 refs., 58 tabs., 23 figs

  1. Project ethics

    CERN Document Server

    Jonasson, Haukur Ingi

    2013-01-01

    How relevant is ethics to project management? The book - which aims to demystify the field of ethics for project managers and managers in general - takes both a critical and a practical look at project management in terms of success criteria, and ethical opportunities and risks. The goal is to help the reader to use ethical theory to further identify opportunities and risks within their projects and thereby to advance more directly along the path of mature and sustainable managerial practice.

  2. Leadership and Project Success in Development Sector

    Directory of Open Access Journals (Sweden)

    Saghir Ahmed

    2017-10-01

    Full Text Available Aim/purpose - The study aims to investigate the relationship among the leadership, operational efficiency and project success in general and the impact of transformational leadership and operational efficiency on project success in particular. Design/methodology/approach - Mean comparison from descriptive statistics and multiple linear regression from inferential statistics was used to determine the association between variables and further impact of the transformational leadership and operational efficiency on project success in the development sector. The paper presents the results of a survey conducted among 200 employees from the top, middle & lower management levels of various national & international development organizations working in Pakistan like Microfinance Banks and other Rural Support Programs. Statistical Package for Social Sciences (SPSS was used to process data. Findings - The result shows positive association among transformational leadership, operational efficiency and project success. In addition, it was found that transformational leadership and operational efficiency have a positive and statistically significant impact on the project success. It is concluded that both transformational leadership and operational efficiency are vital to achieving the optimum level of success in any project, especially in the development sector. Research implications/limitations - The integral limitation of the study was the respondents because most of the development organizations have their operations in rural areas where access was difficult because of limited time and resources. In addition, such organizations are always reluctant to provide survey feedback. Originality/value/contribution - The paper contribution is in the theoretical and practical knowledge of the project success factors in the development sector which is still a somehow unexplored area. Regulators of the development sector may be benefited from this study.

  3. The Nordic nuclear safety program 1994-1997. Project handbook

    International Nuclear Information System (INIS)

    1997-06-01

    This is a new revision of the handbook for administrators of the Nordic reactor safety program NKS. The most important administrative functions in project management are described, which should secure a uniform management approach in all the projects. The description of the organizational scheme of the NKS and distribution of responsibilities is followed by examples of various administrative routines and document forms. In the annex the names and addresses of the staff involved in administration of the NKS program are listed. (EG)

  4. Lattice QCD Application Development within the US DOE Exascale Computing Project

    Energy Technology Data Exchange (ETDEWEB)

    Brower, Richard [Boston U.; Christ, Norman [Columbia U.; DeTar, Carleton [Utah U.; Edwards, Robert [Jefferson Lab; Mackenzie, Paul [Fermilab

    2017-10-30

    In October, 2016, the US Department of Energy launched the Exascale Computing Project, which aims to deploy exascale computing resources for science and engineering in the early 2020's. The project brings together application teams, software developers, and hardware vendors in order to realize this goal. Lattice QCD is one of the applications. Members of the US lattice gauge theory community with significant collaborators abroad are developing algorithms and software for exascale lattice QCD calculations. We give a short description of the project, our activities, and our plans.

  5. Lattice QCD Application Development within the US DOE Exascale Computing Project

    Science.gov (United States)

    Brower, Richard; Christ, Norman; DeTar, Carleton; Edwards, Robert; Mackenzie, Paul

    2018-03-01

    In October, 2016, the US Department of Energy launched the Exascale Computing Project, which aims to deploy exascale computing resources for science and engineering in the early 2020's. The project brings together application teams, software developers, and hardware vendors in order to realize this goal. Lattice QCD is one of the applications. Members of the US lattice gauge theory community with significant collaborators abroad are developing algorithms and software for exascale lattice QCD calculations. We give a short description of the project, our activities, and our plans.

  6. Lattice QCD Application Development within the US DOE Exascale Computing Project

    Directory of Open Access Journals (Sweden)

    Brower Richard

    2018-01-01

    Full Text Available In October, 2016, the US Department of Energy launched the Exascale Computing Project, which aims to deploy exascale computing resources for science and engineering in the early 2020’s. The project brings together application teams, software developers, and hardware vendors in order to realize this goal. Lattice QCD is one of the applications. Members of the US lattice gauge theory community with significant collaborators abroad are developing algorithms and software for exascale lattice QCD calculations. We give a short description of the project, our activities, and our plans.

  7. Fusion technology projects

    International Nuclear Information System (INIS)

    Elen, J.D.

    1985-11-01

    The current status of the European Fusion File project (EFF) is reviewed. Some new tools for the nuclear-data evaluation and the processing are discussed. A method description and users manual for the toroidal-geometry neutronic program system FURNACE has been published. Calculations with FURNACE have been started to obtain the effective tritium breeding ratio and the distribution of the nuclear heat for the 17 Li 83 Pb blanket in the NET II torus geometry. The results of several experiments are reported: tensile tests on vanadium alloy V5%Ti doped with boron; creep embrittlement of stainless steel type 316; critical current test of a composite niobium-tin superconductor

  8. ASEAN projects reviewed.

    Science.gov (United States)

    1980-01-01

    The ASEAN Population Expert Group met in Manila and was followed by a meeting of the ASEAN heads of population programs, during the period November 5-10, 1979. Heads of population programs from Indonesia, Malaysia, Singapore, Thailand, and the Philippines attended. The meetings were held to review progress-to-date on phase 1 projects and to consider the development of an expanded population program. 5 projects funded by UNFPA are reviewed in tabular form with the project, the sponsoring country, date of implementation, data analysis, and date of completion. Suggestions were made for improving and extending these projects and it was also suggested that all projects being developed and proposed should include a section on use of research. 7 new projects were proposed as phase 2 projects. The 1st, sponsored by Malaysia, deals with women in development; project 2, lead by Thailand, will investigate population movement and its effect on development; project 3, led by the Philippines, will develop and strengthen national population information systems and networks in ASEAN countries; project 4, led by Indonesia, is directed towards institutional development and exchanges of personnel; project 5, led by the Philippines, will examine population and development dynamics and the man/resources balance; project 6, led by Thailand, will develop ASEAN social indicators; and project 7, led by Indonesia and Malaysia, will make a comprehensive analysis of existing medical/health care and family planning systems. It was recommended that an executive director of the proposed ASEAN population coordination unit should be appointed to expedite the recommendations of the meeting related to preparation and submission of phase 2 project proposals.

  9. Homogenisation in project management for large German research projects in the Earth system sciences: overcoming the institutional coordination bias

    Science.gov (United States)

    Rauser, Florian; Vamborg, Freja

    2016-04-01

    The interdisciplinary project on High Definition Clouds and Precipitation for advancing climate prediction HD(CP)2 (hdcp2.eu) is an example for the trend in fundamental research in Europe to increasingly focus on large national and international research programs that require strong scientific coordination. The current system has traditionally been host-based: project coordination activities and funding is placed at the host institute of the central lead PI of the project. This approach is simple and has the advantage of strong collaboration between project coordinator and lead PI, while exhibiting a list of strong, inherent disadvantages that are also mentioned in this session's description: no community best practice development, lack of integration between similar projects, inefficient methodology development and usage, and finally poor career development opportunities for the coordinators. Project coordinators often leave the project before it is finalized, leaving some of the fundamentally important closing processes to the PIs. This systematically prevents the creation of professional science management expertise within academia, which leads to an automatic imbalance that hinders the outcome of large research programs to help future funding decisions. Project coordinators in academia often do not work in a professional project office environment that could distribute activities and use professional tools and methods between different projects. Instead, every new project manager has to focus on methodological work anew (communication infrastructure, meetings, reporting), even though the technological needs of large research projects are similar. This decreases the efficiency of the coordination and leads to funding that is effectively misallocated. We propose to challenge this system by creating a permanent, virtual "Centre for Earth System Science Management CESSMA" (cessma.com), and changing the approach from host- based to centre-based. This should

  10. Project Half Double

    DEFF Research Database (Denmark)

    Svejvig, Per; Ehlers, Michael; Adland, Karoline Thorp

    activities carried out within the framework of the projects. The formal part of Project Half Double was initiated in June 2015. We started out by developing, refining and testing the Half Double methodology on seven pilot projects in the first phase of the project, which will end June 2016. The current......Project Half Double has a clear mission to succeed in finding a project methodology that can increase the success rate of our projects while increasing the speed at which we generate new ideas and develop new products and services. Chaos and complexity should be seen as a basic condition...... and as an opportunity rather than a threat and a risk. We are convinced that by doing so, we can strengthen Denmark’s competitiveness and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “projects in half the time with double the impact”, where projects in half the time...

  11. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  12. Airspace Technology Demonstration 3 (ATD-3): Applied Traffic Flow Management Project Overview

    Science.gov (United States)

    Gong, Chester

    2016-01-01

    ATD-3 Project Overview for 3rd Joint Workshop for KAIA-KARI - NASA ATM Research Collaboration. This presentation gives a high level description of the ATD-3 project and related technologies. These technologies include Multi-Flight Common Routes (MFCR), Traffic Aware Strategic Aircrew Requests (TASAR) and Dynamic Routes for Arrivals in Weather (DRAW).

  13. REPNET: project scheduling and workflow optimization for Construction Projects

    Directory of Open Access Journals (Sweden)

    Marco Alvise Bragadin

    2013-10-01

    Full Text Available Project planning and control are core processes for construction management. In practice project planning is achieved by network - based techniques like Precedence Diagramming Method (PDM.Indeed many researchers and practitioners claims that networking techniques as such do not provide a suitable model for construction projects. Construction process modeling should incorporate for specific features of resource flows through project activities. So an improved resource scheduling method for construction is developed, called REPNET, based on a precedence network plotted on a resource–space chart and presented with a flow-line chart. The heuristics of REPNET are used to carry out resource timing while optimizing processes flows and resource usage. The method has been tested on a sample project.

  14. Technical specification for the Quality Information Management System (QIMS) Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Hall, R.C.; Claussen, L.M.; Thurston, I.

    1992-01-01

    This document contains implementation details for the Quality Information Management System (QIMS) Pilot Project, which has been released for VAX/VMS systems using the INGRES RDBMS. The INGRES Applications-By-Forms (ABF) software development tool was used to define the modules and screens which comprise the QIMS Pilot application. These specifications together with the QIMS information model and corresponding database definition constitute the QIMS technical specification and implementation description presented herein. The QIMS Pilot Project represents a completed software product which has been released for production use. Further extension projects are planned which will release new versions for QIMS. These versions will offer expanded and enhanced functionality to meet further customer requirements not accommodated by the QIMS Pilot Project.

  15. Capital projects coordination

    Directory of Open Access Journals (Sweden)

    Zubović Jovan

    2004-01-01

    Full Text Available This paper looks at the difficulties of managing modem capital projects and endeavors to reduce the complexities to simpler and more understandable terms. It examines the project environment, defines project management and discusses points of difference from traditional management. In the second part of the paper are presented fundamentals for project success for different types of projects.

  16. Siberian Chemical Combine laboratory project work plan, fiscal year 1999

    International Nuclear Information System (INIS)

    Morgado, R.E.; Acobyan, R.; Shropsire, R.

    1998-01-01

    The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites' input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves

  17. Image reconstruction technique using projection data from neutron tomography system

    Directory of Open Access Journals (Sweden)

    Waleed Abd el Bar

    2015-12-01

    Full Text Available Neutron tomography is a very powerful technique for nondestructive evaluation of heavy industrial components as well as for soft hydrogenous materials enclosed in heavy metals which are usually difficult to image using X-rays. Due to the properties of the image acquisition system, the projection images are distorted by several artifacts, and these reduce the quality of the reconstruction. In order to eliminate these harmful effects the projection images should be corrected before reconstruction. This paper gives a description of a filter back projection (FBP technique, which is used for reconstruction of projected data obtained from transmission measurements by neutron tomography system We demonstrated the use of spatial Discrete Fourier Transform (DFT and the 2D Inverse DFT in the formulation of the method, and outlined the theory of reconstruction of a 2D neutron image from a sequence of 1D projections taken at different angles between 0 and π in MATLAB environment. Projections are generated by applying the Radon transform to the original image at different angles.

  18. BIM Interoperability Limitations: Australian and Malaysian Rail Projects

    Directory of Open Access Journals (Sweden)

    Kenley Russell

    2016-01-01

    Full Text Available Building information modelling (BIM is defined as a process involving the generation and management of digital representation of physical and functional characteristics of a facility. The purpose of interoperability in integrated or “open” BIM is to facilitate the information exchange between different digital systems, models and tools. There has been effort towards data interoperability with development of open source standards and object-oriented models, such as industry foundation classes (IFC for vertical infrastructure. However, the lack of open data standards for the information exchange for horizontal infrastructure limits the adoption and effectiveness of integrated BIM. The paper outlines two interoperability issues for construction of rail infrastructure. The issues are presented in two case study reports, one from Australia and one from Malaysia. The each case study includes: a description of the project, the application of BIM in the project, a discussion of the promised BIM interoperability solution plus the identification of the unresolved lack of interoperability for horizontal infrastructure project management. The Moreton Bay Rail project in Australia introduces general software interoperability issues. The Light Rail Extension project in Kuala Lumpur outlines an example of the integration problems related to two different location data structures. The paper highlights how the continuing lack of data interoperability limits utilisation of integrated BIM for horizontal infrastructure rail projects.

  19. World energy projections to 2030

    International Nuclear Information System (INIS)

    Criqui, P.; Kouvaritakis, N.

    2000-01-01

    This paper provides a description of the international energy projections elaborated with the POLES energy model for the purpose of analysing, in other papers of this issue, the impacts of technological change at world level and to 2030. Section 2 describes the key exogenous hypotheses on population and economic growth used for this projection, as well as the main resulting changes for the world energy system and in terms of CO 2 emissions. In Section 3 the dynamics of the energy systems are further analysed for four main world regions, while Section 4 is dedicated to the identification of the key uncertainties and of their possible impacts on future energy development. Finally, the last section presents the key messages of this outlook, which shows a rapidly growing world economy and energy consumption with increasing oil and gas prices, although this last feature remains subject to uncertainties on resource endowment estimates. (orig.)

  20. PROJECT LIFE CYCLE OF LEASING MARINE VESSEL OWNERS AND CHARTERERS

    Directory of Open Access Journals (Sweden)

    Алла Витальевна БОНДАРЬ

    2016-03-01

    Full Text Available Based on the study of the basic types of the bareboat charter, presented algorithms decision on the justification of the respective projects. It was found that the initiator of the project can be both owners who wants to pass the boat rental and the charterer, and also who is the owner, who wants to take a boat for rent. It is proved that the implementation of these specific operations requires careful preparation, and using of the project approach will greatly enhance their effectiveness. We describe the life of the project finance lease from the standpoint of the marine vessel, the ship-owner and charterer. It is established that such projects characterized by four-phase structure of the life cycle: preparation, let's call it as the principal decision on (from the chartering of the vessel, the investment - to select the optimal variant (from the charter and the conclusion of the bareboat charter, the phase of operation of the vessel and the fourth - the closure of the project at the end of term bareboat charter. Skill description of the content of each phase, which will continue for the main participants of the project to determine the value of each phase and the value of the whole project.

  1. The Timber Resource Inventory Model (TRIM): a projection model for timber supply and policy analysis.

    Science.gov (United States)

    P.L. Tedder; R.N. La Mont; J.C. Kincaid

    1987-01-01

    TRIM (Timber Resource Inventory Model) is a yield table projection system developed for timber supply projections and policy analysis. TRIM simulates timber growth, inventories, management and area changes, and removals over the projection period. Programs in the TRIM system, card-by-card descriptions of required inputs, table formats, and sample results are presented...

  2. Radioactive waste inventories and projections

    International Nuclear Information System (INIS)

    McLaren, L.H.

    1982-11-01

    This bibliography contains information on radioactive waste inventories and projections included in the Department of Energy's Energy Data Base from January 1981 through September 1982. The arrangement is by report number for reports, followed by nonreports in reverse chronological order. These citations are to research reports, journal articles, books, patents, theses, and conference papers from worldwide sources. Five indexes, each preceded by a brief description, are provided: Corporate Author, Personal Author, Subject, Contract Number, and Report Number. (25 abstracts)

  3. Nuclear Safety Project - annual report 1980

    International Nuclear Information System (INIS)

    1981-08-01

    The Annual Report 1980 is a detailed description (in German language) of work within the Nuclear Safety Project performed in 1980 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes for each individual research activity short summaries in English language on work completed, essential results, plans for the near future. (orig./RW) [de

  4. SEU blending project, concept to commercial operation, Part 4: engineering design

    International Nuclear Information System (INIS)

    Ingalls, D.G.; Ioffe, M.S.; Oliver, A.J.; Smith, T.P.; Ozberk, E.

    2005-01-01

    The process development test program for production of Slightly Enriched Uranium (SEU) dioxide powder and Blend of Dysprosium and Uranium (BDU) oxide powder was initiated almost simultaneously with the conceptual engineering study for the commercial plant in 2001. During the very early phases of the project it was recognized that meeting the challenging requirements would necessitate wide expertise from different departments within the Cameco operations as well as consultants from outside the Company. The project team formed reflected this recognition. The conceptual engineering study was the lead into preparation of the engineering design study in 2003, which provided the process description based on the research and development program being carried out at Cameco Technology Development (CTD), project description, and project cost estimates. The detailed engineering phase commenced in June 2004 and was in progress at the the time when this paper was presented. The detailed engineering phase is addressing all aspects of the commercial plant including all health and safety, environment and security related issues, nuclear safety, training program, all product quality assurance issues, quality management issues, powder and fuel bundle transportation issues, all regulatory requirements, establishing project execution plans and budget, and strategies to control the costs. At the end of the detailed engineering phase, construction packages will be ready for tender, and major pieces of equipment will be selected and procured. (author)

  5. Radiation technology for sewage sludge treatment: The Argentine project

    International Nuclear Information System (INIS)

    Graino, J.G.

    2001-01-01

    Within the environmental applications of ionizing radiation, disinfection of wastewaters or sewage sludges is one of the most best known. Argentina based the project of a full scale irradiation plant on the gamma irradiation application, utilizing Argentine made Cobalt-60 sources. The design characteristics, process descriptions and costs are included. The research project developed information about the irradiation effects on the sludges with respect to plant performance. For the purpose of oxi-irradiation experiments, a lab-scale pool irradiator was constructed and is described. (author)

  6. Ceramics Technology Project database: September 1991 summary report

    Energy Technology Data Exchange (ETDEWEB)

    Keyes, B.L.P.

    1992-06-01

    The piston ring-cylinder liner area of the internal combustion engine must withstand very-high-temperature gradients, highly-corrosive environments, and constant friction. Improving the efficiency in the engine requires ring and cylinder liner materials that can survive this abusive environment and lubricants that resist decomposition at elevated temperatures. Wear and friction tests have been done on many material combinations in environments similar to actual use to find the right materials for the situation. This report covers tribology information produced from 1986 through July 1991 by Battelle columbus Laboratories, Caterpillar Inc., and Cummins Engine Company, Inc. for the Ceramic Technology Project (CTP). All data in this report were taken from the project`s semiannual and bimonthly progress reports and cover base materials, coatings, and lubricants. The data, including test rig descriptions and material characterizations, are stored in the CTP database and are available to all project participants on request. Objective of this report is to make available the test results from these studies, but not to draw conclusions from these data.

  7. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    Science.gov (United States)

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  8. Projection of greenhouse gas emissions 2010 to 2030

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Ole-Kenneth; Winther, M.; Nielsen, Malene; Hjorth Mikkelsen, M.; Albrektsen, R.; Gyldenkaerne, S.; Plejdrup, M.; Hoffmann, L.; Thomsen, M.; Hjelgaard, K.; Fauser, P.

    2011-09-15

    This report contains a description of models, background data and projections of CO{sub 2}, CH{sub 4}, N{sub 2}O, HFCs, PFCs and SF{sub 6} for Denmark. The emissions are projected to 2030 using a scenario together with the expected results of a few individual policy measures. Official Danish forecasts of activity rates are used in the models for those sectors for which the forecasts are available, i.e. the latest official forecast from the Danish Energy Agency. The emission factors refer to international guidelines and some are country-specific and refer to Danish legislation, Danish research reports or calculations based on emission data from a considerable number of industrial plants. The projection models are based on the same structure and method as the Danish emission inventories in order to ensure consistency. (Author)

  9. Projection of greenhouse gas emissions 2007 to 2025

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Ole-Kenneth; Winther, M.; Hjorth Mikkelsen, M.; Gyldenkaerne, S.; Lyck, E.; Plejdrup, M.; Hoffmann, L.; Thomsen, Marianne; Fauser, P.

    2009-02-15

    This report contains a description of models and background data for projection of CO{sub 2}, CH{sub 4}, N{sub 2}O, HFCs, PFCs and SF{sub 6} for Denmark. The emissions are projected to 2025 using basic scenarios together with the expected results of a few individual policy measures. Official Danish forecasts of activity rates are used in the models for those sectors for which the forecasts are available, i.e. the latest official forecast from the Danish Energy Agency. The emission factors refer to international guidelines and some are country-specific and refer to Danish legislation, Danish research reports or calculations based on emission data from a considerable number of plants. The projection models are based on the same structure and method as the Danish emission inventories in order to ensure consistency. (au)

  10. Projection of greenhouse gas emissions - 2005 to 2030

    Energy Technology Data Exchange (ETDEWEB)

    Illerup, J.B.; Nielsen, Ole-Kenneth; Winther, Morten; Hjort Mikekkelsen, M.; Lyck, E.; Nielsen, Malene; Hoffmann, L.; Gyldenkaerne, S.; Thomsen, Marianne [DMU-AU, Dept. of Policy Analysis (Denmark)

    2007-01-15

    This report contains a description of models and background data for projection of CO{sub 2}, CH{sub 4}, N{sub 2}O, HFCs, PFCs and SF{sub 6} for Denmark. The emissions are projected to 2030 using basic scenarios together with the expected results of a few individual policy measures. Official Danish forecasts of activity rates are used in the models for those sectors for which the forecasts are available, i.e. the latest official forecast from the Danish Energy Authority. The emission factors refer to international guidelines and some are country-specific and refer to Danish legislation, Danish research reports or calculations based on emission data from a considerable number of plants. The projection models are based on the same structure and method as the Danish emission inventories in order to ensure consistency. (au)

  11. Project THEMIS: A Center for Remote Sensing.

    Science.gov (United States)

    This report summarizes the technical work accomplished under Project THEMIS, A Center for Remote Sensing at the University of Kansas during the...period 16 September 1967 through 15 September 1973. The highlights of the four major areas forming the remote sensing system are presented. A detailed description of the latest radar spectrometer results is presented.

  12. The SIMRAND methodology - Simulation of Research and Development Projects

    Science.gov (United States)

    Miles, R. F., Jr.

    1984-01-01

    In research and development projects, a commonly occurring management decision is concerned with the optimum allocation of resources to achieve the project goals. Because of resource constraints, management has to make a decision regarding the set of proposed systems or tasks which should be undertaken. SIMRAND (Simulation of Research and Development Projects) is a methodology which was developed for aiding management in this decision. Attention is given to a problem description, aspects of model formulation, the reduction phase of the model solution, the simulation phase, and the evaluation phase. The implementation of the considered approach is illustrated with the aid of an example which involves a simplified network of the type used to determine the price of silicon solar cells.

  13. Guidebook on environmental impact assessment for in situ leach mining projects

    International Nuclear Information System (INIS)

    2005-05-01

    Assessment of the potential environmental impact of an in situ leach (ISL) project is the first step in the permission and licensing process. An Environmental Impact Assessment (EIA) serves as the basis for preparing an Environmental Impact Statement (EIS), which in turn identifies the potential environmental and socioeconomic impact of a proposed project and outlines measures to mitigate the impact. The EIS review process serves to inform the public about a proposed project as well as provide regulatory agencies with assurance that ISL technology will comply with environmental standards, and that project sites can be rehabilitated to pre-mining use. This publication provides a step-by-step description of project parameters that must be addressed in conducting an EIA and preparing an EIS. It also includes EIA/EIS case histories for current operations in Australia, the Czech Republic, Kazakhstan and the United States of America. The publication will be useful to companies considering development of ISL projects and to regulatory personnel who are responsible for writing environmental regulations and licensing ISL projects

  14. Overlapping Boundaries of the Project Time Management and Project Risk Management

    Directory of Open Access Journals (Sweden)

    Marius PODEAN

    2010-01-01

    Full Text Available Based on utility function, milestones during project and/or the end of projects or programme may be categorized in what are called soft-deadline and hard-deadline. In contrast with the soft-end projects, the hard-end projects posses a decrease of utility function with a vertical asymptote character around the deadline for project completion. In extreme situations, the utility function itself may fall under zero (projects may generate losses to both constructor and customer. Existing risk analysis methodologies observe risks from monetary terms. The typical risks are correlated with an increase in final project costs. In order to estimate harddeadline milestones and/or end of projects or programme is critical to employ the time dimension rather than the typical cost-based risk analysis. Here, we comprehensively describe a structured methodology that focuses on minimizing and mitigating project specific delay risks. The method may supplement existing cost-based risk analysis in projects. We aim to elegantly combine moderation techniques to reveal the intrinsic risk of the projects. In addition to the technical risks, the moderation techniques are able to bring evidence of risks as the team efficacy, diverse un-correlations or miss-understanding about the roles of the team members in the team – most of the project soft risk. Described methodology encourages the common understanding of risks for participants, crystallizing the essence of what can go wrong in complex situations and where the opportunities can be unlocked.

  15. Decontamination and decommissioning of the Experimental Boiling Water Reactor (EBWR): Project final report, Argonne National Laboratory

    International Nuclear Information System (INIS)

    Fellhauer, C.R.; Boing, L.E.; Aldana, J.

    1997-03-01

    The Final Report for the Decontamination and Decommissioning (D ampersand D) of the Argonne National Laboratory - East (ANL-E) Experimental Boiling Water Reactor (EBWR) facility contains the descriptions and evaluations of the activities and the results of the EBWR D ampersand D project. It provides the following information: (1) An overall description of the ANL-E site and EBWR facility. (2) The history of the EBWR facility. (3) A description of the D ampersand D activities conducted during the EBWR project. (4) A summary of the final status of the facility, including the final and confirmation surveys. (5) A summary of the final cost, schedule, and personnel exposure associated with the project, including a summary of the total waste generated. This project report covers the entire EBWR D ampersand D project, from the initiation of Phase I activities to final project closeout. After the confirmation survey, the EBWR facility was released as a open-quotes Radiologically Controlled Area,close quotes noting residual elevated activity remains in inaccessible areas. However, exposure levels in accessible areas are at background levels. Personnel working in accessible areas do not need Radiation Work Permits, radiation monitors, or other radiological controls. Planned use for the containment structure is as an interim transuranic waste storage facility (after conversion)

  16. The USE Project

    DEFF Research Database (Denmark)

    Frøkjær, E.; Hornbæk, K.; Høegh, Rune Thaarup

    2006-01-01

    This paper provides experience from activities in the USE project. The USE project is a research project that aims at bridging the gap between usability evaluation and user interface design. It is conducted from 2005 to 2008 in collaboration between researchers from Aalborg University and Copenha......This paper provides experience from activities in the USE project. The USE project is a research project that aims at bridging the gap between usability evaluation and user interface design. It is conducted from 2005 to 2008 in collaboration between researchers from Aalborg University...... and Copenhagen University, and developers and managers working in software development organizations....

  17. Conjoint utility analysis of technical maturity and project progress of construction project

    Directory of Open Access Journals (Sweden)

    Ma Wei

    2016-01-01

    Full Text Available In this paper, taking construction project as the research object, the relationship between the project maturity index calculated by the construction project technical risks with different fine degree and the project progress index is studied, and the equilibrium relationship between the Party A’s utility curve and the Party B’s cost curve of using project maturity index and project progress index as the research variables is analyzed. The results show that, when the construction project technical risk division is more precise, the conjoint utility of the project's technical maturity index and the project progress is higher, and the project’s Party A and Party B two sides are closer to the optimal equilibrium. This shows that the construction project technical risk must be finely divided, and managed and controlled respectively, which will help to improve the conjoint utility of the project Party A and Party B two sides.

  18. Final Project Report Project 10749-4.2.2.1 2007-2009

    Energy Technology Data Exchange (ETDEWEB)

    Zacher, Alan H.; Holladay, Johnathan E.; Frye, J. G.; Brown, Heather M.; Santosa, Daniel M.; Oberg, Aaron A.

    2009-05-11

    This is the final report for the DOE Project 10749-4.2.2.1 for the FY2007 - FY2009 period. This report is non-proprietary, and will be submitted to DOE as a final project report. The report covers activities under the DOE Project inside CRADA 269 (Project 53231) as well as project activites outside of that CRADA (Project 56662). This is the final report that is summarized from the non-proprietary quarterlies submitted to DOE over the past 2.5 years, which in turn are summaries from the proprietary technical reporting to UOP.

  19. Heavy Metals Contaminated Soil Project, Resource Recovery Project, and Dynamic Underground Stripping Project

    International Nuclear Information System (INIS)

    1994-02-01

    The Department of Energy (DOE) established the Office of Technology Development (EM-50) (OTD) as an element of Environmental Restoration and Waste Management (EM) in November, 1989. OTD has begun to search out, develop, test and demonstrate technologies that can now or in the future be applied to the enormous remediation problem now facing the DOE and the United States public in general. Technology demonstration projects have been designed to attack a separate problem as defined by DOE. The Heavy Metals Contaminated Soil Project was conceived to test and demonstrate off-the-shelf technologies (dominantly from the mining industry) that can be brought to bear on the problem of radionuclide and heavy metal contamination in soils and sediments. The Resource Recovery Project is tasked with identifying, developing, testing, and evaluating new and innovative technologies for the remediation of metal contaminated surface and groundwater. An innovative twist on this project is the stated goal of recovering the metals, formerly disposed of as a waste, for reuse and resale, thereby transforming them into a usable resource. Finally, the Dynamic Underground Stripping Project was developed to demonstrate and remediate underground spills of hydrocarbons from formations that are (1) too deep for excavation, and/or (2) require in-situ remediation efforts of long duration. This project has already been shown effective in reducing the time for remediation by conventional methods from an estimated 200 years at the Lawrence Livermore National Laboratory (LLNL) to less than one year. The savings in time and dollars from this technology alone can be immeasurable

  20. Description of project for pretreatment and storage of wastes of L.P.R. (Radiochemical Processes Laboratory)

    International Nuclear Information System (INIS)

    Doval, J.C.F.; Mehlich, A.M.; Quilici, D.F.

    1987-01-01

    The aim of the project is to allow the start up and operation of LPR (Radiochemical Processes Laboratory) as part of the intended activities in the plant. In this paper, the pretreatment and storage of liquid wastes generated at the LPR are described. The pretreatment section will be set up inside the shielded cells already existent in the LPR, where a previous concentration through the evaporation of liquid wastes will take place. The storage section has to be constructed on purpose in order to temporarily store the concentrates. The cells of transference and preconditioning of solid wastes are also described. These cells will be mounted inside the building, allowing the handling of radioactive solids generated as effluents during the reprocessing plan. In the description, the use of non conventional materials for the boiler making and the construction of cells is specially mentioned. (Author)

  1. Successful project management

    CERN Document Server

    Young, Trevor L

    2016-01-01

    Successful Project Management, 5th edition, is an essential guide for anyone who wants to improve the success rate of their projects. It will help managers to maintain a balance between the demands of the customer, the project, the team and the organization. Covering the more technical aspects of a project from start to completion it contains practised and tested techniques, covering project conception and start-up, how to manage stake holders, effective risk management, project planning and launch and execution. Also including a brand new glossary of key terms, it provides help with evaluating your project as well as practical checklists and templates to ensure success for any ambitious project manager. With over one million copies sold, the hugely popular Creating Success series covers a wide variety of topic, with the latest editions including new chapters such as Tough Conversations and Treating People Right. This indispensable business skills collection is suited to a variety of roles, from someone look...

  2. Multi Media Systems. International Compendium. Eleven Project Descriptions of Combined Teaching Systems in Eight Countries.

    Science.gov (United States)

    Gaudray, Francine, Comp.

    The demands made by modern technological society on the traditional educational system are briefly discussed. The remainder of the compendium describes 11 projects which are using educational technology, principally televised instruction, with success. Projects from Brazil, Canada, West Germany, France, England, Japan, Poland, and the United…

  3. Reflexive project management in high-abition projects

    NARCIS (Netherlands)

    Loeber, Anne; Vermeulen, T.

    2016-01-01

    Purpose
    The Aristotelian notion of phronèsis inspired innovative work in the realm of project management as well as in literature on sustainability and societal transformations. We argue that both literatures may benefit from a dialogue between the two, especially in view of outlining project

  4. Project brief of pre-contract in project management

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim; Mohd Azmi Sidid Omar; Abdul Rahman Norazumin; Zakaria Dris; Abdul Murad Abu Bakar; Alwi Othman

    2010-01-01

    Project brief is a comprehensive document used in translating the user needs and requirement for the project implementation. This document is important for the designer as a main guidance towards establishing project details. Research shown that problem usually arises from not well-defined scope and needs by the user. With lack of information the designer tend to assume and interprets wrong translation. Other issues arise from project management are time, cost, budgetary, lack of communication and establishing quality management. Some ideas of improvement were gain by doing cross reference with JKR quality system management, workshop and brainstorming. It shows that an improvement of data collection system has to be integrating with some basic format details, drawings and declaration forms to be established. (author)

  5. The CAREM project: Present status and development activities

    International Nuclear Information System (INIS)

    Boado Magan, H.J.; Ordonez, J.P.; Hey, A.

    1997-01-01

    The CAREM Project is a low power NPP of 25 Mwe, with an integrated self pressurized primary system. The cooling of the primary system is of the natural circulation type and several passive safety systems are included. The owner of the Project is Argentina's CNEA (Comision Nacional de Energia Atomica) and its associated company, INVAP, is the main contractor. The present status of the CAREM Project is presented. The possible evolution of the CAREM project is mentioned in relation with a new containment design. A short description of the Experimental Facilities, listed below, already in operation and under construction are also included: CAPCN High Pressure Loop. Natural convection loop to verify dynamic response and critical heat flux; RA-8. Critical Facility, designed and constructed for the CAREM Project (that may be used as a general uses facility); RPV lnternals. The whole assembly of absorbent rods, connecting rods and the rode guides are being constructed in a 1:1 scale. The aims of this experimental facility are vibration analysis and manufacturing parameters definitions. Control Drive Mechanisms. A series of verification and tests are being carried out on these within RPV Hydraulically driven mechanisms. Other development activities are mentioned in relation with the thermalhydraulics, Steam Generators and Control. (author)

  6. Application for approval of the Cold Lake Expansion Project

    International Nuclear Information System (INIS)

    1997-02-01

    Imperial Oil Resources Limited applied to the Alberta Energy and Utilities Board for approval to expand its operations at Cold Lake, Alberta and to construct and operate an electrical power plant and electrical generator substation. Imperial Oil also applied to the Alberta Environmental Protection Branch to prepare the site for a new central plant for the expansion. The company also requested a short-term groundwater withdrawal permit to provide temporary water supply for start-up. Imperial Oil claims that the project is in the public interests given the project's social, environmental and economic effects. Imperial Oil submitted this 4 volume document in support of their application. The documentation includes a project description, an environmental impact assessment, a biophysical and resource use assessment, a socio-economic assessment, and environmental baseline studies. The project is scheduled for start-up in late 1999 at a total cost of at least $440 million. refs., tabs., figs

  7. IT Project Selection

    DEFF Research Database (Denmark)

    Pedersen, Keld

    2016-01-01

    for initiation. Most of the research on project selection is normative, suggesting new methods, but available empirical studies indicate that many methods are seldom used in practice. This paper addresses the issue by providing increased understanding of IT project selection practice, thereby facilitating...... the development of methods that better fit current practice. The study is based on naturalistic decision-making theory and interviews with experienced project portfolio managers who, when selecting projects, primarily rely on political skills, experience and personal networks rather than on formal IT project......-selection methods, and these findings point to new areas for developing new methodological support for IT project selection....

  8. CENTAR gas centrifuge enrichment project: economics and engineering considerations

    International Nuclear Information System (INIS)

    Fishman, A.M.

    1977-01-01

    Description of some economic and engineering considerations of the CENTAR Associates' 3000000 SWU/yr gas centrifuge uranium enrichment plant project. The need for uranium enrichment facilities is discussed, and the advantages of using the centrifuge process rather than the presently used gaseous diffusion process are reviewed. A description of the CENTAR plant is given, highlighting the major features of the facility. Since the centiruges to be used in the plant account for approximately 50% of the capital cost of the project, the philosophy of their manufacture and procurement is discussed. Various design considerations which bear upon process economics are presented to give the reader an appreciation of the subtleties of the technology and the flexibility possible in plant design. Special attention is given to meeting the needs of the utility customer at the lowest possible cost

  9. Geothermal Direct Use Program Opportunity Notice Projects Lessons Learned Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Lunis, B.C.

    1986-01-01

    The use of geothermal energy for direct-use applications was aided through the development of a number of successful field experiment projects funded on a cost-shared basis by the US Department of Energy, Division of Geothermal Technology. This document provides a summary of the projects administered by the US Department of Energy's Idaho Operations Office and technically monitored through the Idaho National Engineering Laboratory (EG and G Idaho, Inc.). An overview of significant findings and conclusions is provided, as are project descriptions and activities, resource development, design, construction, and operational features. Legal and institutional considerations are also discussed.

  10. Requirements Analysis Study for Master Pump Shutdown System Project Development Specification

    International Nuclear Information System (INIS)

    BEVINS, R.R.

    2000-01-01

    This study is a requirements document that presents analysis for the functional description for the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment. The requirements in this study apply to the first phase of the W314 Project. This document has been updated during the definitive design portion of the first phase of the W314 Project to capture additional software requirements and is planned to be updated during the second phase of the W314 Project to cover the second phase of the project's scope

  11. The role of project planning in project management

    OpenAIRE

    Klitsenko, A. I.; Клиценко, А. И.

    2013-01-01

    This article describes the importance of the process of project planning. The author gives irrefutable arguments concerning crucial role of project planning. This article presents the definition, objects and the main goal of project planning. The purpose of this article is to review such objects of project planning as project scope, risk and human resources. Данная статья описывает важность процесса проектного планирования. Автор дает неопровержимые доводы, касающиеся решающей роли проектн...

  12. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 80. Quarterly report, July--September, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This report contains information on petroleum enhanced recovery projects. In addition to project descriptions, contract numbers, principal investigators and project management information is included.

  13. ASP project. Dissolved oxygen issues in ASP project

    Directory of Open Access Journals (Sweden)

    M.Y. Bondar

    2018-03-01

    Full Text Available The article presents the latest results of studies about the effect of dissolved oxygen on the efficiency of the ASP flooding project implemented by Salym Petroleum Development N.V.. Pilot project on experimental injection of anionic surfactant solutions, soda and polymer into the reservoir for enhanced oil recovery (ASP project has been implemented since 2016. The stability of one of the components of the ASP polymer is strongly dependent on the presence of iron, stiffness cations and dissolved oxygen in the water. Since the polymer is used for injection at two stages of the project, which are essential and the longest, at the design stage of ASP project a whole complex of polymer protection had been established against negative factors, in particular from the influence of oxygen, which causes not only oxygen corrosion but also irreversible destruction polymer chains. In the paper, studies on the stability of polymer solutions are described, an analysis of viscosity loss with time in the presence of iron and oxygen for polymer solutions is carried out. The choice of chemical deoxygenation method for the control of dissolved oxygen is substantiated. The program of laboratory studies of the ASP project and the analytical instruments used are described. The technological scheme of the ASP process is presented, and recommendations for the implementation of the technology are given.

  14. Tunnel Boring Machine for nuclear waste repository research project

    International Nuclear Information System (INIS)

    Janzon, H.A.

    1994-01-01

    A description is presented of a Tunnel Boring Machine and its intended use on a research project underway in Sweden for demonstrating and testing methods for rock investigation at a suitable depth for a deep repository for nuclear waste

  15. Petroleum service projects in the Gulf of Guinea

    Science.gov (United States)

    Ken-Worgu, Kenneth Chukwumeka

    2011-07-01

    tasks of the job, including objectives, description, managerial role, nontechnical aspects, approaches, information sources, discussions and contributions are projected in the body of this literature.

  16. Projective geometry and projective metrics

    CERN Document Server

    Busemann, Herbert

    2005-01-01

    The basic results and methods of projective and non-Euclidean geometry are indispensable for the geometer, and this book--different in content, methods, and point of view from traditional texts--attempts to emphasize that fact. Results of special theorems are discussed in detail only when they are needed to develop a feeling for the subject or when they illustrate a general method. On the other hand, an unusual amount of space is devoted to the discussion of the fundamental concepts of distance, motion, area, and perpendicularity.Topics include the projective plane, polarities and conic sectio

  17. Projective measure without projective Baire

    DEFF Research Database (Denmark)

    Schrittesser, David; Friedman, Sy David

    We prove that it is consistent (relative to a Mahlo cardinal) that all projective sets of reals are Lebesgue measurable, but there is a ∆13 set without the Baire property. The complexity of the set which provides a counterexample to the Baire property is optimal.......We prove that it is consistent (relative to a Mahlo cardinal) that all projective sets of reals are Lebesgue measurable, but there is a ∆13 set without the Baire property. The complexity of the set which provides a counterexample to the Baire property is optimal....

  18. Project Planning and Implementation: Lessons Learned From the AQBMP Project

    National Research Council Canada - National Science Library

    1997-01-01

    ...). This NSRP report is funded as an addendum to the Air Quality Best Management Practices (AQBMP) project (N1 -944). The AQBMP project was completed using an intensive project planning process using a variety of quality management tools...

  19. One project's waste is another project's resource

    International Nuclear Information System (INIS)

    Short, J.

    1997-01-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables

  20. Automation of the National Water Quality Laboratories, U. S. Geological Survey. I. Description of laboratory functions and definition of the automation project

    Energy Technology Data Exchange (ETDEWEB)

    Morris, W.F.; Ames, H.S.

    1977-07-01

    In January 1976, the Water Resources Division of the U.S. Geological Survey asked Lawrence Livermore Laboratory to conduct a feasibility study for automation of the National Water Quality (NWQ) Laboratory in Denver, Colorado (formerly Denver Central Laboratory). Results of the study were published in the Feasibility Study for Automation of the Central Laboratories, Lawrence Livermore Laboratory, Rept. UCRL-52001 (1976). Because the present system for processing water samples was found inadequate to meet the demands of a steadily increasing workload, new automation was recommended. In this document we present details necessary for future implementation of the new system, as well as descriptions of current laboratory automatic data processing and analytical facilities to better define the scope of the project and illustrate what the new system will accomplish. All pertinent inputs, outputs, and other operations that define the project are shown in functional designs.

  1. Automation of the National Water Quality Laboratories, U.S. Geological Survey. I. Description of laboratory functions and definition of the automation project

    International Nuclear Information System (INIS)

    Morris, W.F.; Ames, H.S.

    1977-01-01

    In January 1976, the Water Resources Division of the U.S. Geological Survey asked Lawrence Livermore Laboratory to conduct a feasibility study for automation of the National Water Quality (NWQ) Laboratory in Denver, Colorado (formerly Denver Central Laboratory). Results of the study were published in the Feasibility Study for Automation of the Central Laboratories, Lawrence Livermore Laboratory, Rept. UCRL-52001 (1976). Because the present system for processing water samples was found inadequate to meet the demands of a steadily increasing workload, new automation was recommended. In this document we present details necessary for future implementation of the new system, as well as descriptions of current laboratory automatic data processing and analytical facilities to better define the scope of the project and illustrate what the new system will accomplish. All pertinent inputs, outputs, and other operations that define the project are shown in functional designs

  2. Prototypical Rod Consolidation Demonstration Project

    International Nuclear Information System (INIS)

    1993-05-01

    The objective of Phase 3 of the Prototypical Rod consolidation Demonstration Project (PRCDP) was to procure, fabricate, assemble, and test the Prototypical Rod consolidation System as described in the NUS Phase 2 Final Design Report. This effort required providing the materials, components, and fabricated parts which makes up all of the system equipment. In addition, it included the assembly, installation, and setup of this equipment at the Cold Test Facility. During the Phase 3 effort the system was tested on a component, subsystem, and system level. This volume 1, discusses the PRCDP Phase 3 Test Program that was conducted by the HALLIBURTON NUS Environmental Corporation under contract AC07-86ID12651 with the United States Department of Energy. This document, Volume 1, Book 1 discusses the following topics: the background of the project; test program description; summary of tests and test results; problem evaluation; functional requirements confirmation; recommendations; and completed test documentation for tests performed in Phase 3

  3. Ambidextrous Leadership and Sustainability-Based Project Performance: The Role of Project Culture

    Directory of Open Access Journals (Sweden)

    Junwei Zheng

    2017-12-01

    Full Text Available Most studies in the project management field emphasized the effects of leaders or managers, but these effects have rarely been examined at the project level. To cover this research gap, this study applies organizational ambidexterity theory to examine the effects among ambidextrous leadership, ambidextrous culture and sustainability-based project performance. Using a valid sample of 217 project leaders and members from Chinese construction projects, the method of multiple linear regression was adopted to assess the direct relationship among ambidextrous leadership, ambidextrous culture and project performance. Moreover, the bootstrapping technique through structural equation modeling, has been used to analyze the mediating effect of ambidextrous culture. Additionally, the sample data was divided into different groups according to the median value of the variables to conduct the ANOVA and to assess the within-group differences. The results indicated a positive and direct relationship that ambidextrous leadership has on project performance and ambidextrous culture. In addition, there was also a mediating impact of ambidextrous leadership on project performance via ambidextrous culture. Thus, ambidextrous leadership combined with transformational leadership as well as transactional leadership likely has a stronger positive impact on project performance through fostering the adaptive culture and consistent culture. Our findings contribute to an in-depth understanding of the role of the leader and culture for project outcomes. The project-based organization in construction projects could train project leaders’ ambidextrous leadership behavior to facilitate the formation of an ambidextrous culture and to increase project performance. Moreover, this study enriches the existing literature on leadership and project management by highlighting the important path of ambidextrous leadership and ambidextrous culture on the performance at the project level

  4. Managing complex, high risk projects a guide to basic and advanced project management

    CERN Document Server

    Marle, Franck

    2016-01-01

    Maximizing reader insights into project management and handling complexity-driven risks, this book explores propagation effects, non-linear consequences, loops, and the emergence of positive properties that may occur over the course of a project. This book presents an introduction to project management and analysis of traditional project management approaches and their limits regarding complexity. It also includes overviews of recent research works about project complexity modelling and management as well as project complexity-driven issues. Moreover, the authors propose their own new approaches, new methodologies and new tools which may be used by project managers and/or researchers and/or students in the management of their projects. These new elements include project complexity definitions and frameworks, multi-criteria approaches for project complexity measurement, advanced methodologies for project management (propagation studies to anticipate potential behaviour of the project, and clustering approaches...

  5. Managing a project's legacy: implications for organizations and project management

    Science.gov (United States)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  6. The Environmental Management Project Manager's Handbook for improved project definition

    International Nuclear Information System (INIS)

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook

  7. Water Integration Project Science Strategies White Paper

    International Nuclear Information System (INIS)

    Alan K. Yonk

    2003-01-01

    This white paper has been prepared to document the approach to develop strategies to address Idaho National Engineering and Environmental Laboratory (INEEL) science and technology needs/uncertainties to support completion of INEEL Idaho Completion Project (Environmental Management [EM]) projects against the 2012 plan. Important Idaho Completion Project remediation and clean-up projects include the 2008 OU 10-08 Record of Decision, completion of EM by 2012, Idaho Nuclear Technology and Engineering Center Tanks, INEEL CERCLA Disposal Facility, and the Radioactive Waste Management Complex. The objective of this effort was to develop prioritized operational needs and uncertainties that would assist Operations in remediation and clean-up efforts at the INEEL and develop a proposed path forward for the development of science strategies to address these prioritized needs. Fifteen needs/uncertainties were selected to develop an initial approach to science strategies. For each of the 15 needs/uncertainties, a detailed definition was developed. This included extracting information from the past interviews with Operations personnel to provide a detailed description of the need/uncertainty. For each of the 15 prioritized research and development needs, a search was performed to identify the state of the associated knowledge. The knowledge search was performed primarily evaluating ongoing research. The ongoing research reviewed included Environmental Systems Research Analysis, Environmental Management Science Program, Laboratory Directed Research and Development, Inland Northwest Research Alliance, United States Geological Survey, and ongoing Operations supported projects. Results of the knowledge search are documented as part of this document

  8. Water Integration Project Science Strategies White Paper

    Energy Technology Data Exchange (ETDEWEB)

    Alan K. Yonk

    2003-09-01

    This white paper has been prepared to document the approach to develop strategies to address Idaho National Engineering and Environmental Laboratory (INEEL) science and technology needs/uncertainties to support completion of INEEL Idaho Completion Project (Environmental Management [EM]) projects against the 2012 plan. Important Idaho Completion Project remediation and clean-up projects include the 2008 OU 10-08 Record of Decision, completion of EM by 2012, Idaho Nuclear Technology and Engineering Center Tanks, INEEL CERCLA Disposal Facility, and the Radioactive Waste Management Complex. The objective of this effort was to develop prioritized operational needs and uncertainties that would assist Operations in remediation and clean-up efforts at the INEEL and develop a proposed path forward for the development of science strategies to address these prioritized needs. Fifteen needs/uncertainties were selected to develop an initial approach to science strategies. For each of the 15 needs/uncertainties, a detailed definition was developed. This included extracting information from the past interviews with Operations personnel to provide a detailed description of the need/uncertainty. For each of the 15 prioritized research and development needs, a search was performed to identify the state of the associated knowledge. The knowledge search was performed primarily evaluating ongoing research. The ongoing research reviewed included Environmental Systems Research Analysis, Environmental Management Science Program, Laboratory Directed Research and Development, Inland Northwest Research Alliance, United States Geological Survey, and ongoing Operations supported projects. Results of the knowledge search are documented as part of this document.

  9. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    Science.gov (United States)

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  10. Ecological Compliance Assessment Project: 1994 Summary report

    International Nuclear Information System (INIS)

    Brandt, C.A.

    1994-11-01

    The Ecological Compliance Assessment Project (ECAP) began full operation on March 1, 1994. The project is designed around a baseline environmental data concept that includes intensive biological field surveys of key areas of the Hanford Site where the majority of Site activities occur. These surveys are conducted at biologically appropriate times of year to ensure that the data gathered are current and accurate. The data are entered into the ECAP database, which serves as a reference for the evaluation of review requests coming in to the project. This methodology provided the basis for over 90 percent of the review requests received. Field surveys conducted under ECAP are performed to document occurrence information for species of concern and to obtain habitat descriptions. There are over 200 species of concern on the Hanford Site, including plants, birds, mammals, reptiles, amphibians, fish, and invertebrates. In addition, Washington State has designated mature sagebrush-steppe habitat as a Priority Habitat meriting special protective measures. Of the projects reviewed, 17 resulted or will result in impacts to species or habitats of concern on the Hanford Site. The greatest impact has been on big sagebrush habitat. Most of the impact has been or will be within the 600 Area of the Site

  11. Project planning and management techniques of the fast-paced TMX-Upgrade construction

    International Nuclear Information System (INIS)

    Seberger, C.D.; Chargin, A.K.

    1981-01-01

    The Tandem Mirror Experiment-Upgrade (TMX-Upgrade) construction will be completed in 18 months at a total cost of $14.5 million. This paper describes the project planning and the management techniques used to complete the TMX-Upgrade within its allocated cost and schedule. In the planning stages of a project, before approval of the proposal, we define major project objectives, create a work breakdown structure (WBS), detail a technical description for each level of the WBS, and provide detailed bottoms-up cost estimates and summary schedules. In the operating phase, which continues throughout the project, we establish budget and schedule baselines. The reporting phase includes The Department of Energy (DOE) reviews of project status at monthly, quarterly, and semiannual intervals. These reports include cost, schedule, manpower, major procurement, and technical status information

  12. Cultural Issue and its Influence in the Management of Global Project Teams

    Directory of Open Access Journals (Sweden)

    Nadia Lima

    2016-04-01

    Full Text Available The interactions between the project manager and team members may be affected by several variables, such as culture, leadership style of the project manager, and the complexity of the developed tasks. Focused in this context, the objective of this paper is to investigate and describe how the culture issue can affect the anagement of global project teams. It is a qualitative, descriptive study conducted in a large multinational company in the automotive sector. The results of this research show that cultural issues can influence both positively and negatively the management of project global teams and the managers of these projects have to deal with several management challenges that require the adoption of certain ways of dealing with culture impacts in managing their teams to minimize potential problems in this context.

  13. 7 CFR 3405.19 - Monitoring progress of funded projects.

    Science.gov (United States)

    2010-01-01

    ... RESEARCH, EDUCATION, AND EXTENSION SERVICE, DEPARTMENT OF AGRICULTURE HIGHER EDUCATION CHALLENGE GRANTS... reform, and opportunities to enhance dissemination of exemplary end products/results. (b) An Annual..., including: A review of project objectives and accomplishments; a description of any products and outcomes...

  14. Reliability and fault tolerance in the European ADS project

    International Nuclear Information System (INIS)

    Biarrotte, Jean-Luc

    2013-01-01

    After an introduction to the theory of reliability, this paper focuses on a description of the linear proton accelerator proposed for the European ADS demonstration project. Design issues are discussed and examples of cases of fault tolerance are given. (author)

  15. Project 2010 For Dummies

    CERN Document Server

    Muir, Nancy C

    2010-01-01

    A friendly reference guide to Microsoft Project, the leading enterprise project management software. As project management software, Microsoft Project allows you to oversee your business activities effectively. You can manage resources, share project info, perform modeling and scenario analysis, and standardize reporting processes. This easy-to-understand guide is completely updated to cover the latest changes and newest enhancements to Project 2010 and shows you how to get Project 2010 to work for you. After an introduction to basic project management concepts, you'll discover the mechanics o

  16. Central Arkansas Energy Project. Coal to medium-Btu gas

    Science.gov (United States)

    1982-05-01

    The Central Arkansas Energy Project has as its objective the conversion of coal in a central location to a more readily usable energy source, medium Btu gas (MBG), for use at dispersed locations as fuel for power production and steam generation, or as a feedstock for chemical processing. The project elements consist of a gasification facility to produce MBG from coal, a pipeline to supply the MBG to the dispersed sites. The end of line users investigated were the repowering or refueling of an existing Arkansas Power and Light Co. Generating station, an ammonia plant, and a combined cycle cogeneration facility for the production of steam and electricity. Preliminary design of the gasification plant including process engineering design bases, process flow diagrams, utility requirements, system description, project engineering design, equipment specifications, plot plan and section plot plans, preliminary piping and instrument diagrams, and facilities requirements. Financial analyses and sensitivities are determined. Design and construction schedules and manpower loadings are developed. It is concluded that the project is technically feasible, but the financial soundness is difficult to project due to uncertainty in energy markets of competing fuels.

  17. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  18. Linux toys II 9 Cool New Projects for Home, Office, and Entertainment

    CERN Document Server

    Negus, Christopher

    2006-01-01

    Builds on the success of the original Linux Toys (0-7645-2508-5) and adds projects using different Linux distributionsAll-new toys in this edition include a car computer system with built-in entertainment and navigation features, bootable movies, a home surveillance monitor, a LEGO Mindstorms robot, and a weather mapping stationIntroduces small business opportunities with an Internet radio station and Internet caf ̌projectsCompanion Web site features specialized hardware drivers, software interfaces, music and game software, project descriptions, and discussion forumsIncludes a CD-ROM with scr

  19. From Project Management to Process Management - Effectively Organising Transdisciplinary Projects

    OpenAIRE

    Moschitz, Heidrun

    2013-01-01

    In transdisciplinary projects, the roles of researchers change. In addition to being a source of knowledge, they are required to engage in knowledge exchange processes. This results in an alteration at project level: researchers need to creatively manage projects as group processes.

  20. On a structural property in the state complexity of projected regular languages

    Czech Academy of Sciences Publication Activity Database

    Jirásková, G.; Masopust, Tomáš

    2012-01-01

    Roč. 449, Aug 31 (2012), s. 93-105 ISSN 0304-3975 R&D Projects: GA ČR(CZ) GPP202/11/P028 Institutional research plan: CEZ:AV0Z10190503 Institutional support: RVO:67985840 Keywords : projections * state complexity * descriptional complexity Subject RIV: BA - General Mathematics Impact factor: 0.489, year: 2012 http://www.sciencedirect.com/science/article/pii/S0304397512003532

  1. Marlim project finance; 'Project finance' de Marlim

    Energy Technology Data Exchange (ETDEWEB)

    D' Almeida, Albino Lopes [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2004-07-01

    Project Finance is often used worldwide to raise the funds to develop big projects, particularly in the area of power and infra-structure. It is designed to support a singular project and a specific purpose company is created to obtain the financing. The debt payment is secured by the enterprise's cash flow, avoiding real guarantee requirements. The lenders receive the future revenues and the property of the assets to be built. The risks are mitigated by agreements exhaustively negotiated among the parties. One of the most important Project Finances performed in Brazil is the Marlim Project, structured in order to complete the development of the Marlim oil field. This is the biggest Brazilian oil field, producing more than 500,000 barrels a day, almost 35% of the national production. This paper presents the general concepts related to this type of financing and general information about the project, including its structuring, negotiation and closing. The total commitment reaches US$ 1.5 billion obtained in both domestic and international markets through equity, bridge loan, bonds and commercial papers. Its whole life is 10 years, using 2 special purpose companies in its configuration. (author)

  2. Project-Based Organizations and the New Spirit of Capitalism

    DEFF Research Database (Denmark)

    Jagd, Søren

    Luc Boltanski and Eve Chiapello’s analysis of recent changes in capitalism – Le nouvel esprit du capitalisme - is an important contribution to the sociological analysis of capitalism. The aim of this paper is to present their main argument. It is argued that a particular important aspect...... of their analysis is the ideal-typical model of the new spirit of capitalism, the ideological underpinning of project-based organizations in ‘The Project World’. It is argued that the ideal-typical model of the Project World is the most elaborated description of the ‘cultural code’ of the emergent form...... of capitalist organizations. Last, it is discussed how we may obtain empirical evidence to test the hypothesis of a major change in capitalist organizational forms as well as in the recent spirit of capitalism....

  3. Project Decision Chain

    DEFF Research Database (Denmark)

    Rolstadås, Asbjørn; Pinto, Jeffrey K.; Falster, Peter

    2015-01-01

    To add value to project performance and help obtain project success, a new framework for decision making in projects is defined. It introduces the project decision chain inspired by the supply chain thinking in the manufacturing sector and uses three types of decisions: authorization, selection......, and plan decision. A primitive decision element is defined where all the three decision types can be accommodated. Each task in the primitive element can in itself contain subtasks that in turn will comprise new primitive elements. The primitive elements are nested together in a project decision chain....

  4. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  5. Pilot Project: analysis, development and projection

    OpenAIRE

    Tapia Abril, Verónica Emilia; Chérrez Rodas, Karina; García Pesántez, Gabriela Rosana; Maldonado Marchán, María Elisa; Bustamante Montesdeoca, José Luis

    2014-01-01

    Since the introduction of ICT in architecture and teaching, pedagogies of education have faced their learning paradigms change. Institutes of higher education have folded to this motion and have undergone a process of change by implementing multimedia elements in their subjects. Through the pilot project educational videos that aim to meet the highest standards of educational videos described by Van Dam have been developed. The project expects to generate educational videos for different depa...

  6. Adaptation of Agile Project Management Methodology for Project Team

    Directory of Open Access Journals (Sweden)

    Rasnacis Arturs

    2015-12-01

    Full Text Available A project management methodology that defines basic processes, tools, techniques, methods, resources and procedures used to manage a project is necessary for effective and successful IT project management. Each company needs to define its own methodology or adapt some of the existing ones. The purpose of the research is to evaluate the possibilities of adapting IT project development methodology according to the company, company employee characteristics and their mutual relations. The adaptation process will be illustrated with a case study at an IT company in Latvia where the developed methodology is based on Agile Scrum, one of the most widespread Agile methods.

  7. EBFA project

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    An engineering project office was established during the fall of 1976 to manage and coordinate all of the activities of the Electron Beam Fusion Project. The goal of the project is to develop the Electron Beam Fusion Accelerator (EBFA) and its supporting systems, and integrate these systems into the new Electron Beam Fusion Facility (EBFF). Supporting systems for EBFA include a control/monitor system, a data acquistion/automatic data processing system, the liquid transfer systems, the insulating gas transfer systems, etc. Engineers and technicians were assigned to the project office to carry out the engineering design, initiate procurement, monitor the fabrication, perform the assembly and to assist the pulsed power research group in the activation of the EBFA

  8. Isolated elders demonstration project : closer to home - a descriptive evaluation

    OpenAIRE

    Cusack, Sandra A.

    1996-01-01

    The purpose of this demonstration project is to support isolated elders through outreach. The goal is to get seniors "out of their homes" and back into the community, assisting them to make decisions and take action on their own behalf. The process involved training a group of volunteers to interview elders, using a mini-life review technique to encourage reminiscence. In listening to their stories, the volunteer's task was to discover the elder's needs and barriers to socialization, and to l...

  9. Traditional Project Management and the Visual Workplace Environment to Improve Project Success

    Science.gov (United States)

    Fichera, Christopher E.

    2016-01-01

    A majority of large IT projects fail to meet scheduled deadlines, are over budget and do not satisfy the end user. Many projects fail in spite of utilizing traditional project management techniques. Research of project management has not identified the use of a visual workspace as a feature affecting or influencing the success of a project during…

  10. Learning the ABCs (of Project Management)

    Science.gov (United States)

    Frandsen, Allan

    2003-01-01

    To lead a project effectively, one has to establish and maintain the flexibility to take appropriate actions when needed. Overconstrained situations should be avoided. To get on top of matters and stay there, a manager needs to anticipate what it will take to successfully complete the job. Physical and financial resources, personnel, and management structure are all important considerations. Carving out the necessary turf up front can make a world of difference to the project's outcome. After the "what," "where," and "when" of a project are nailed down, the next question is "how" to do the job. When I first interviewed for the job of Science Payload Manager on the Advanced Composition (ACE) Explorer mission, Dr. Edward Stone (ACE Principal Investigator) asked, "Al, give me an idea of your management style." It was a question I had not considered before. I thought about it for a few seconds and then answered, "Well, the first descriptive term that comes to mind is the word "tranquility". That seemed to startle him. So I added, "I guess what I mean is, that if the situation is tranquil and the project is running smoothly, then I've anticipated all the problems and taken necessary actions to head them off." He then asked: "Have you ever reached this state?" "No," I admitted, "but I strive for it." That seemed to satisfy him because I got the job.

  11. The project manager's desk reference: project planning, schedulding, evaluation, control, systems

    National Research Council Canada - National Science Library

    Lewis, James P

    2007-01-01

    In this Third Edition of The Project Manager's Desk Reference, top project management consultant James Lewis arms you with today's most comprehensive and understandable project management resources...

  12. NATURAL BARRIERS TARGETED THRUST FY 2004 PROJECTS

    International Nuclear Information System (INIS)

    NA

    2005-01-01

    This booklet contains project descriptions of work performed by the Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM), Office of Science and Technology and International's (OSTandI) Natural Barriers Targeted Thrust during Fiscal Year (FY) 2004. The Natural Barriers Targeted Thrust is part of OSTandI's Science and Technology Program which supports the OCRWM mission to manage and dispose of high-level radioactive waste and spent nuclear fuel in a manner that protects health, safety, and the environment; enhances national and energy security; and merits public confidence. In general, the projects described will continue beyond FY 2004 assuming that the technical work remains relevant to the proposed Yucca Mountain Repository and sufficient funding is made available to the Science and Technology Program

  13. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  14. R and D programmes in Germany. Selection and evaluation of projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    In Germany, budgets for research and development rest on three pillars, which are the federal government, the 16 states, and the civil sector. The total expenditure for 1997 amounted to 83.7 times 1 billion Deutsche marks, and this occupied 2.3 of Germany's GNP (gross national product). National research projects constitute the main stream even today. As for federal government-financed projects, they are managed mainly by BMBF (Federal Ministry of Education, Science, Research, and Technology). There are project carriers as the managerial organizations. Requests for proposals for research and development projects are published in official gazettes and technical journals. Such a project has to contain detailed descriptions regarding the setting of targets, levels of technology, cost accounting, development schedule, history of discovery and development involved, etc. Analyses are conducted into technology, economic risk, market, and environmental impact. Support by the German government for government-related projects is given in compliance with predetermined guidelines. The evaluation and selection of submitted proposals are performed by professionals of the project carrier level. In this paper, explanations are also given about contracts, management of progress, and evaluation. (NEDO)

  15. MSFC Propulsion Systems Department Knowledge Management Project

    Science.gov (United States)

    Caraccioli, Paul A.

    2007-01-01

    This slide presentation reviews the Knowledge Management (KM) project of the Propulsion Systems Department at Marshall Space Flight Center. KM is needed to support knowledge capture, preservation and to support an information sharing culture. The presentation includes the strategic plan for the KM initiative, the system requirements, the technology description, the User Interface and custom features, and a search demonstration.

  16. Impact of Community Driven Development Project: A Case of ...

    African Journals Online (AJOL)

    This paper evaluates impact of Community Driven Development programme on infrastructure under National Fadama II Project in Oyo State Nigeria. Data were collected from two hundred and sixty-four farmers using multistage sampling procedures. Data were analyzed using descriptive statistics and infrastructure index.

  17. The Ethiopian Flora Project

    DEFF Research Database (Denmark)

    Demissew, Sebsebe; Brochmann, Christian; Kelbessa, Ensermu

    2011-01-01

    The account reviews and analyses the scietific projects derived from activities in connection with the Ethiopian Flora Project, including the [Ethiopian] Monocot Project, the Afro-alpine "Sky-island" project, the Vegetation and Ecological Conditions of Plantations Project, the Fire Ecology Projec...

  18. Project mechanisms challenges

    International Nuclear Information System (INIS)

    Perthuis, Ch. de

    2005-06-01

    The project mechanism complete the quotas systems concerning the carbon dioxide emissions market. The author explains and discusses these mechanisms and provides a panorama of the existing and developing projects. More specially she brings information on the mechanism of clean developments and renewable energies, the coordinated mechanisms, the agricultural projects, the financing of the projects and the exchange systeme of the New south Wales. (A.L.B.)

  19. Hood River Monitoring and Evaluation Project, Annual Report 2002-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Vaivoda, Alexis

    2004-02-01

    The Hood River Production Program Monitoring and Evaluation Project is co-managed by the Confederated Tribes of Warm Springs (CTWSRO) and the Oregon Department of Fish and Wildlife. The program is divided up to share responsibilities, provide efficiency, and avoid duplication. From October 2002 to September 2003 (FY 03) project strategies were implemented to monitor, protect, and restore anadromous fish and fish habitat in the Hood River subbasin. A description of the progress during FY 03 is reported here. Additionally an independent review of the entire program was completed in 2003. The purpose of the review was to determine if project goals and actions were achieved, look at critical uncertainties for present and future actions, determine cost effectiveness, and choose remedies that would increase program success. There were some immediate changes to the implementation of the project, but the bulk of the recommendations will be realized in coming years.

  20. Approximate particle number projection in hot nuclei

    International Nuclear Information System (INIS)

    Kosov, D.S.; Vdovin, A.I.

    1995-01-01

    Heated finite systems like, e.g., hot atomic nuclei have to be described by the canonical partition function. But this is a quite difficult technical problem and, as a rule, the grand canonical partition function is used in the studies. As a result, some shortcomings of the theoretical description appear because of the thermal fluctuations of the number of particles. Moreover, in nuclei with pairing correlations the quantum number fluctuations are introduced by some approximate methods (e.g., by the standard BCS method). The exact particle number projection is very cumbersome and an approximate number projection method for T ≠ 0 basing on the formalism of thermo field dynamics is proposed. The idea of the Lipkin-Nogami method to perform any operator as a series in the number operator powers is used. The system of equations for the coefficients of this expansion is written and the solution of the system in the next approximation after the BCS one is obtained. The method which is of the 'projection after variation' type is applied to a degenerate single j-shell model. 14 refs., 1 tab

  1. J-PARC project

    International Nuclear Information System (INIS)

    Nagamiya, Shoji

    2004-01-01

    From Japanese fiscal year JFY01, which started on April 1, 2001, a new accelerator project to provide high-intensity proton beams proceeded into its construction phase. This project, which is now called the Japan Proton Accelerator Research Complex (J-PARC) project, is conducted under a cooperation of two institutions, KEK and Japan Atomic Energy Research Institution. We set a goal to achieve 1 MW proton beams at 3 GeV and 0.75 MW beams at 50 GeV. The project will be completed within six years, with the anticipated first beams in the spring of 2007. In this article I will describe (a) the project itself, (b) sciences to be pursued at this new accelerator complex and (c) the present status and future plans of the project

  2. How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

    Science.gov (United States)

    Kea, Howard

    2011-01-01

    The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

  3. Something of value Governance of Projects in the Project-Based Organisation

    DEFF Research Database (Denmark)

    Riis, Eva

    2013-01-01

    The paper presents a conceptual framework for studying Governance of Projects and issues of value in the project-based organisation. Attempts at exploring and conceptualising the issues in the current literature are reviewed. Issues pertinent to gaining value by Governance of Projects have mainly...... for a better understanding of Governance of Projects and value contribution. The findings presented here form the conceptual foundation for subsequent empirical studies of value by Governance of Projects....... been explored from the perspective of economic theory. Models found in the literature are not typically concerned with value for the implementing organisation as a whole; their scope is limited to the time just after project completion. No valid, empirically-based models of value creation by Governance...

  4. Underestimation of Project Costs

    Science.gov (United States)

    Jones, Harry W.

    2015-01-01

    Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

  5. ORGANIZATION OF FUTURE ENGINEERS' PROJECT-BASED LEARNING WHEN STUDYING THE PROJECT MANAGEMENT METHODOLOGY

    Directory of Open Access Journals (Sweden)

    Halyna V. Lutsenko

    2015-02-01

    Full Text Available The peculiarities of modern world experience of implementation of project-based learning in engineering education have been considered. The potential role and place of projects in learning activity have been analyzed. The methodology of organization of project-based activity of engineering students when studying the project management methodology and computer systems of project management has been proposed. The requirements to documentation and actual results of students' projects have been described in detail. The requirements to computer-aided systems of project management developed by using Microsoft Project in the scope of diary scheduling and resources planning have been formulated.

  6. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 78, quarter ending March 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    This report presents descriptions of various research projects and field projects concerned with the enhanced recovery of petroleum. Contract numbers, principal investigators, company names, and project management information is included.

  7. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    Science.gov (United States)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of

  8. Projection of SO2, NOx, NMVOC, particulate matter and black carbon emissions - 2015-2030

    DEFF Research Database (Denmark)

    Nielsen, Ole-Kenneth; Plejdrup, Marlene Schmidt; Hjelgaard, Katja Hossy

    This report contains a description of models and background data for projection of SO2, NOX, NMVOC, PM2.5 and black carbon for Denmark. The emissions are projected to 2030 using basic scenarios together with the expected results of a few individual policy measures. Official Danish forecasts...

  9. Effluent monitoring Quality Assurance Project Plan for radioactive airborne emissions data. Revision 2

    International Nuclear Information System (INIS)

    Frazier, T.P.

    1995-12-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for compiling Hanford Site radioactive airborne emissions data. These data will be reported to the U.S. Environmental Protection Agency, the US Department of Energy, and the Washington State Department of Health. Effluent Monitoring performs compliance assessments on radioactive airborne sampling and monitoring systems. This Quality Assurance Project Plan is prepared in compliance with interim guidelines and specifications. Topics include: project description; project organization and management; quality assurance objectives; sampling procedures; sample custody; calibration procedures; analytical procedures; monitoring and reporting criteria; data reduction, verification, and reporting; internal quality control; performance and system audits; corrective actions; and quality assurance reports

  10. Developing corpus-based translation methods between informal and formal mathematics : project description

    NARCIS (Netherlands)

    Kaliszyk, C.; Urban, J.; Vyskocil, J.; Geuvers, J.H.; Watt, S.M.; Davenport, J.H.; Sexton, A.P.; Sojka, P.; Urban, J.

    2014-01-01

    The goal of this project is to (i) accumulate annotated informal/formal mathematical corpora suitable for training semi-automated translation between informal and formal mathematics by statistical machine-translation methods, (ii) to develop such methods oriented at the formalization task, and in

  11. ORGANIZATIONAL PROJECT MANAGEMENT MATURITY

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2017-11-01

    Full Text Available The present article is aimed at developing a set of recommendations for achieving a higher level of organizational project maturity at a given enterprise. Methodology. For the purposes of the current research, the available information sources on the components of project management system are analysed; the essence of “organizational maturity” and the existing models of organizational maturity are studied. The method of systemic and structural analysis, as well as the method of logical generalization, are employed in order to study the existing models of organizational maturity, to describe levels of organizational maturity, and finally to develop a set of methodological recommendations for achieving a higher level of organizational project maturity at a given enterprise. The results of the research showed that the core elements of project management system are methodological, organizational, programtechnical, and motivational components. Project management encompasses a wide range of issues connected with organizational structure, project team, communication management, project participants, etc. However, the fundamental basis for developing project management concept within a given enterprise starts with defining its level of organizational maturity. The present paper describes various models of organizational maturity (staged, continuous, petal-shaped and their common types (H. Кеrzner Organizational Maturity Model, Berkeley PM Maturity Model, Organizational Project Management Maturity Model, Portfolio, Program & Project Management Maturity Model. The analysis of available theoretic works showed that the notion “organizational project maturity” refers to the capability of an enterprise to select projects and manage them with the intention of achieving its strategic goals in the most effective way. Importantly, the level of maturity can be improved by means of formalizing the acquired knowledge, regulating project-related activities

  12. Impact evaluation in multicultural educational projects : case: ADAPTYKES project

    OpenAIRE

    Kuusisto, Miika

    2014-01-01

    The objective of this thesis was to examine the common evaluation concepts of the European Union’s funded projects. Such concepts inter alia are effectiveness, impacts and sustainability. The aim was to study how these are realized in multicultural educational case–project in a context, where the project is funded by the European Commission’s Leonardo DaVinci Programme. Thesis introduces two evaluation approaches, which are Logical Framework Approach and Realistic evaluation model. The fi...

  13. Role of quality assurance vs project manager's responsibility for waste projects

    International Nuclear Information System (INIS)

    Solecki, J.

    1989-01-01

    This paper takes a project manager's perspective and discusses the role of the quality assurance organization in the development, implementation and interface related to the QA program for waste projects. The author describes the role which the QA program plays in allowing project management to assure that the project manager knows what is placed in the repository and the characteristics of the surrounding environment meet closure requirements

  14. Ceramic Technology Project database: September 1993 summary report

    Energy Technology Data Exchange (ETDEWEB)

    Keyes, B.L.P.

    1994-01-01

    Data presented in this report represent an intense effort to improve processing methods, testing methods, and general mechanical properties of candidate ceramics for use in advanced heat engines. Materials discussed include GN-10, GS-44, GTE PY6, NT-154, NT-164, sintered-reaction-bonded silicon nitrides, silicon nitride combined with rare-earth oxides, NT-230, Hexoloy SX-G1, Dow Corning`s {beta}-Si{sub 3}N{sub 4}, and a few whisker-reinforced ceramic composites. Information in this report was taken from the project`s semiannual and bimonthly progress reports and from final reports summarizing the results of individual studies. Test results are presented in tabular form and in graphs. All data, including test rig descriptions and material characterizations, are stored in the CTP database and are available to all project participants on request. Objective of this report is to make available the test results from these studies but not to draw conclusions from those data.

  15. BioProject

    Data.gov (United States)

    U.S. Department of Health & Human Services — The BioProject database provides an organizational framework to access information about research projects with links to data that have been or will be deposited...

  16. Guidance and Control Software Project Data - Volume 2: Development Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the development documents from the GCS project. Volume 2 contains three appendices: A. Guidance and Control Software Development Specification; B. Design Description for the Pluto Implementation of the Guidance and Control Software; and C. Source Code for the Pluto Implementation of the Guidance and Control Software

  17. Project Management Techniques

    OpenAIRE

    Mihalache Anita; Salagean Liana

    2010-01-01

    Project management is a technique that can aid in the planning, scheduling, and monitoring of complex projects characterized by numerous, non repetitive jobs called activities. Examples of projects that would use project management include: - developing a mass rapid – transit system for a metropolitan area; - organizing the relocation of a corporate headquarters; - planning the production of a concert, film, or play; - developing and marketing a new automobile; - constructing a high – rise of...

  18. Description of the quality system and the organisation of activities at the Halden Reactor Project

    International Nuclear Information System (INIS)

    Tiseth, Ann Katrine

    1996-04-01

    The Halden Reactor Project is a joint undertaking of national organisations in 19 countries sponsoring a jointly financed programme under the auspices of the OECD - Nuclear Energy Agency. The quality assurance routines in force at the Halden Reactor Project are based on long term experience and are devised to ensure product quality and meeting of programme goals, customers expectations and authority requirements. Quality is an overall connotation related to all activities carried out at the Project and concerns all individuals performing such activities. It is also related to subcontractors and suppliers of parts and components. The results of the work depend very strongly on the quality level of each component, regardless how small it is. The activities at the Halden Reactor Project are organised in eight technical divisions, one advisory group and one administrative group. This report describes the quality system, the organisation of the activities in the divisions and the technical and administrative infrastructures. The quality system is built according to the international standards ISO 9001 and ISO 9000-3. Iso 9000-3 is ISO 9001 applied to software development, supply and maintenance. (author)

  19. Linearized Jastrow-style fluctuations on spin-projected Hartree-Fock

    International Nuclear Information System (INIS)

    Henderson, Thomas M.; Scuseria, Gustavo E.

    2013-01-01

    The accurate and efficient description of strong electronic correlations remains an important objective in electronic structure theory. Projected Hartree-Fock theory, where symmetries of the Hamiltonian are deliberately broken and projectively restored, all with a mean-field computational scaling, shows considerable promise in this regard. However, the method is neither size extensive nor size consistent; in other words, the correlation energy per particle beyond broken-symmetry mean field vanishes in the thermodynamic limit, and the dissociation limit of a molecule is not the sum of the fragment energies. These two problems are closely related. Recently, Neuscamman [Phys. Rev. Lett. 109, 203001 (2012)] has proposed a method to cure the lack of size consistency in the context of the antisymmetrized geminal power wave function (equivalent to number-projected Hartree-Fock-Bogoliubov) by using a Jastrow-type correlator in Hilbert space. Here, we apply the basic idea in the context of projected Hartree-Fock theory, linearizing the correlator for computational simplicity but extending it to include spin fluctuations. Results are presented for the Hubbard Hamiltonian and for some simple molecular systems

  20. Uav Photogrammetry: a Practical Solution for Challenging Mapping Projects

    Science.gov (United States)

    Saadatseresht, M.; Hashempour, A. H.; Hasanlou, M.

    2015-12-01

    We have observed huge attentions to application of unmanned aerial vehicle (UAV) in aerial mapping since a decade ago. Though, it has several advantages for handling time/cost/quality issues, there are a dozen of challenges in working with UAVs. In this paper, we; as the Robotic Photogrammetry Research Group (RPRG), will firstly review these challenges then show its advantages in three special practical projects. For each project, we will share our experiences through description of the UAV specifications, flight settings and processing steps. At the end, we will illustrate final result of each project and show how this technology could make unbelievable benefits to clients including 3D city realistic model in decimetre level, ultra high quality map production in several centimetre level, and accessing to a high risk and rough relief area for mapping aims.

  1. Choice of large projects

    Energy Technology Data Exchange (ETDEWEB)

    Harris, R

    1978-08-01

    Conventional cost/benefit or project analysis has generally not taken into account circumstances in which the project under consideration is large enough that its introduction to the economy would have significant general equilibrium effects. In this paper, rules are examined that would indicate whether such large projects should be accepted or rejected. The rules utilize information yielded by before-project and after-project equilibrium prices and production data. Rules are developed for the undistorted ''first-best'' case, the case in which the fixed costs of the project are covered by distortionary taxation, and for the case of projects producing public goods. 34 references.

  2. Description of the default climate scenario for impact projects in NRP-II

    NARCIS (Netherlands)

    Verweij W; Viner D; NOP

    2001-01-01

    The Dutch National Research Programme on Climate Change (NRP) is funding strategic research on climate change. One of the central research themes focuses on potential impacts of climate change. In general, results of impact projects may differ markedly, depending on input of scenario data for

  3. Analytical simulation platform describing projections in computed tomography systems

    International Nuclear Information System (INIS)

    Youn, Hanbean; Kim, Ho Kyung

    2013-01-01

    To reduce the patient dose, several approaches such as spectral imaging using photon counting detectors and statistical image reconstruction, are being considered. Although image-reconstruction algorithms may significantly enhance image quality in reconstructed images with low dose, true signal-to-noise properties are mainly determined by image quality in projections. We are developing an analytical simulation platform describing projections to investigate how quantum-interaction physics in each component configuring CT systems affect image quality in projections. This simulator will be very useful for an improved design or optimization of CT systems in economy as well as the development of novel image-reconstruction algorithms. In this study, we present the progress of development of the simulation platform with an emphasis on the theoretical framework describing the generation of projection data. We have prepared the analytical simulation platform describing projections in computed tomography systems. The remained further study before the meeting includes the following: Each stage in the cascaded signal-transfer model for obtaining projections will be validated by the Monte Carlo simulations. We will build up energy-dependent scatter and pixel-crosstalk kernels, and show their effects on image quality in projections and reconstructed images. We will investigate the effects of projections obtained from various imaging conditions and system (or detector) operation parameters on reconstructed images. It is challenging to include the interaction physics due to photon-counting detectors into the simulation platform. Detailed descriptions of the simulator will be presented with discussions on its performance and limitation as well as Monte Carlo validations. Computational cost will also be addressed in detail. The proposed method in this study is simple and can be used conveniently in lab environment

  4. Project management best practices: forging win-win partnerships and mitigating power project risk

    International Nuclear Information System (INIS)

    Trowsdale, R.

    2006-01-01

    This paper discusses aspects of project management to mitigate power project risk. end-to-end project development involves development phase, permitting phase, implementation phase, and operational phase. Each phase involves a number of different elements. In renewable energy project good management requires maintaining project discipline and schedule throughout all phases. Project success requires commercial competitiveness, fuel availability, power sales contracts, stake holder support, permitting, effective execution, construction and good technical performance

  5. Spent Nuclear Fuel Project technical baseline document. Fiscal year 1995: Volume 1, Baseline description

    International Nuclear Information System (INIS)

    Womack, J.C.; Cramond, R.; Paedon, R.J.

    1995-01-01

    This document is a revision to WHC-SD-SNF-SD-002, and is issued to support the individual projects that make up the Spent Nuclear Fuel Project in the lower-tier functions, requirements, interfaces, and technical baseline items. It presents results of engineering analyses since Sept. 1994. The mission of the SNFP on the Hanford site is to provide safety, economic, environmentally sound management of Hanford SNF in a manner that stages it to final disposition. This particularly involves K Basin fuel, although other SNF is involved also

  6. Angular momentum projection of tilted axis rotating states

    Energy Technology Data Exchange (ETDEWEB)

    Oi, M; Onishi, N; Tajima, N [Tokyo Univ. (Japan); Horibata, T

    1998-03-01

    We applied an exact angular momentum projection to three dimensional cranked HFB (3d-CHFB) states. Tilted axis rotating states (TAR) and principal axis rotating states (PAR) are compared. It is shown that TAR is more adequate than PAR for description of the back bending phenomena driven by tilted rotation or wobbling motion. (author)

  7. Space Projects: Improvements Needed in Selecting Future Projects for Private Financing

    Science.gov (United States)

    1990-01-01

    The Office of Management and Budget (OMB) and NASA jointly selected seven projects for commercialization to reduce NASA's fiscal year 1990 budget request and to help achieve the goal of increasing private sector involvement in space. However, the efforts to privately finance these seven projects did not increase the commercial sector's involvement in space to the extent desired. The General Accounting Office (GAO) determined that the projects selected were not a fair test of the potential of increasing commercial investment in space at an acceptable cost to the government, primarily because the projects were not properly screened. That is, neither their suitability for commercialization nor the economic consequences of seeking private financing for them were adequately evaluated before selection. Evaluations and market tests done after selection showed that most of the projects were not viable candidates for private financing. GAO concluded that projects should not be removed from NASA's budget for commercial development until after careful screening has been done to determine whether adequate commercial demand exists, development risks are commercially acceptable and private financing is found or judged to be highly likely, and the cost effectiveness of such a decision is acceptable. Premature removal of projects from NASA's budget ultimately can cause project delays and increased costs when unsuccessful commercialization candidates must be returned to the budget. NASA also needs to ensure appropriate comparisons of government and private financing options for future commercialization projects.

  8. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  9. LHC related projects and studies - Part (I)

    International Nuclear Information System (INIS)

    Garoby, R.; Ponce, L.

    2012-01-01

    This session was the first of the two sessions dealing with future projects and the associated studies. Starting with descriptions of the plans and needs of the LHCb and ALICE experiments which are less extensively documented than those of ATLAS and CMS, it addressed the plans for the High Luminosity LHC and for the upgrade of the injectors, both for protons and other ions. (authors)

  10. The technical status of the supersara project at its termination

    International Nuclear Information System (INIS)

    Markovina, A.; Randles, J.

    1987-01-01

    On March 10th 1983 the Council of Ministers of the European Community adopted the decision to abandon the SuperSARA project. In the frame of this decision, the Management of the SuperSARA project formulated the guidelines to close the project, which included the preparation of the present final report. This report presents the final status of the project, which means that it reflects the situation in March 1983, with a few updates introduced shortly afterwards in conformity with the safety requirements which were being revised at that time. The aim of this report is to give a general description of activities which were carried on to implement the experimental programme and to illustrate some important achievements reached in specific areas. In addition, it is also intended to provide the access key to the documentation which was produced in the past years, so as to make the most significant technical material easily available for any possible future use

  11. A new approach to cost effective projects: High performance project teams

    International Nuclear Information System (INIS)

    Chambers, N.C.

    1994-01-01

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  12. A new approach to cost effective projects: High performance project teams

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, N.C. [Brown and Root Energy Services (United Kingdom)

    1994-12-31

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  13. Project Finance and Projects in the Energy Sector in Developing Countries

    OpenAIRE

    ERMELA KRIPA; HALIT XHAFA

    2013-01-01

    The purpose of this study is to show the importance of using project finance in infrastructure investments in developing countries. The paper will be focused only on one infrastructure sector, which is energy. Structurally, power project finance has involved largely buildown-transfer (BOT) project structures and long-term contracts. The projects largely reflect a rational allocation of risks among public and private participants. Private sponsors and lenders generally assume risks for complet...

  14. A Qualitative Study of the Relationship between a Banking IT Troubled Project and the Executive Project Sponsor's Project Management Maturity Level

    Science.gov (United States)

    Northcraft, Terry G.

    2017-01-01

    This qualitative study examined the effect the level of project management maturity a banking IT project sponsor has on project success. Project management maturity is gauged by the amount of modern project management training, knowledge and organizational skills an individual or organization has and applies to their project lifecycle experiences.…

  15. Expedited technology demonstration project (Revised mixed waste management facility project) Project baseline revision 4.0 and FY98 plan

    International Nuclear Information System (INIS)

    Adamson, M. G.

    1997-01-01

    The re-baseline of the Expedited Technology Demonstration Project (Revised Mixed Waste Facility Project) is designated as Project Baseline Revision 4.0. The last approved baseline was identified as Project Baseline Revision 3.0 and was issued in October 1996. Project Baseline Revision 4.0 does not depart from the formal DOE guidance followed by, and contained in, Revision 3.0. This revised baseline document describes the MSO and Final Forms testing activities that will occur during FY98, the final year of the ETD Project. The cost estimate for work during FY98 continues to be $2.OM as published in Revision 3.0. However, the funds will be all CENRTC rather than the OPEX/CENTRC split previously anticipated. LLNL has waived overhead charges on ETD Project CENRTC funds since the beginning of project activities. By requesting the $2.OM as all CENTRC a more aggressive approach to staffing and testing can be taken. Due to a cost under- run condition during FY97 procurements were made and work was accomplished, with the knowledge of DOE, in the Feed Preparation and Final Forms areas that were not in the scope of Revision 3.0. Feed preparation activities for FY98 have been expanded to include the drum opening station/enclosure previously deleted

  16. Projects as value constellations

    DEFF Research Database (Denmark)

    Laursen, Markus

    Creating value has been outlined as very central to projects applying the organizational perspective to projects. It has been suggested that value is created in value constellations or project networks, where actors work together to create value. However, research on the value creation process...... in value constellations is scarce, and through an exploratory study of two project networks in a cultural setting we investigate how value is created in value constellations. We outline how each project may be a distinct type of value constellation, one project creates value for the partners of the network...... as a consortium, and the project creates value primarily for others as a facilitator....

  17. Introduction to the Project

    DEFF Research Database (Denmark)

    Kuhn, Johan M.; Malchow-Møller, Nikolaj; Sørensen, Anders

    In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two ...... important qualifications for the understanding of the contributions and results established in the project.......In this note a short introduction to the project “Employment Effects of Entrepreneurs” is presented. First, we describe the purpose of the project; second, we present the background; third, we briefly describe the three papers that constitute the output of the project, and fourth, we discuss two...

  18. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  19. FME Senior Project Managers: A Juggling Act of Multiple Projects | Poster

    Science.gov (United States)

    By Peggy Pearl, Contributing Writer It was not until the 1950s that organizations in the United States began to apply project management tools and techniques to complex construction and engineering projects (http://en.m.wikipedia.org/wiki/Project_life_cycle).

  20. GEO-6 project for Galileo data scientific utilization

    Science.gov (United States)

    Buresova, Dalia; Lastovicka, Jan; Boska, Josef; Sauli, Petra; Kouba, Daniel; Mosna, Zbysek

    The future GNSS Galileo system offer a number of benefits (e.g. availability of better accuracy positioning, new frequencies bands allowing the implementation of specific techniques, provable time-stamp and location data using SIS authorisation, integrity, better support ad-hoc algorithms for data analysis and other service guarantee for liability and regulated applications) are widely spread among different disciplines. Also applications which are less interesting from the commercial and market point of view could successfully contribute to the numerous social benefits and support the innovation in the international research. The aim of the GEO-6 project "Scientific research Using GNSS" is to propose and broaden scientific utilization of future GNSS Galileo system data in research. It is a joint project of seven institutions from six countries led by the Atos Origin Company from Spain. The core of the project consists from six projects in five priority areas: PA-1 Remote sensing of the ocean using GNSS reflections, PA-2a Investigating GNSS ionospheric data assimilation, PA-2b 3-D gravity wave detection and determination (both PA-2a and PA-2b are ionospheric topics), PA-3 Demonstration of capability for operational forecasting of atmospheric delays, PA-4 GNSS seismometer, PA-5 Spacecraft formation flying using global navigation satellite systems. Institute of Atmospheric Physics, Prague, Czech Republic is responsible for the project PA-2b, where we developed and tested (to the extent allowed by available data) an algorithm and computer code for the 3-D detection of gravity waves and determination of their characteristics. The main drivers of the GEO-6 project are: high levels of accuracy even with the support of local elements, sharing of solutions and results for the worldwide scientific community. The paper will present basic description of the project with more details concerning Czech participation in it.

  1. NATURAL BARRIERS TARGETED THRUST FY 2004 PROJECTS

    Energy Technology Data Exchange (ETDEWEB)

    NA

    2005-07-27

    This booklet contains project descriptions of work performed by the Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM), Office of Science and Technology and International's (OST&I) Natural Barriers Targeted Thrust during Fiscal Year (FY) 2004. The Natural Barriers Targeted Thrust is part of OST&I's Science and Technology Program which supports the OCRWM mission to manage and dispose of high-level radioactive waste and spent nuclear fuel in a manner that protects health, safety, and the environment; enhances national and energy security; and merits public confidence. In general, the projects described will continue beyond FY 2004 assuming that the technical work remains relevant to the proposed Yucca Mountain Repository and sufficient funding is made available to the Science and Technology Program.

  2. A Requirements-Based Exploration of Open-Source Software Development Projects--Towards a Natural Language Processing Software Analysis Framework

    Science.gov (United States)

    Vlas, Radu Eduard

    2012-01-01

    Open source projects do have requirements; they are, however, mostly informal, text descriptions found in requests, forums, and other correspondence. Understanding such requirements provides insight into the nature of open source projects. Unfortunately, manual analysis of natural language requirements is time-consuming, and for large projects,…

  3. Project Risk Management

    Science.gov (United States)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  4. Methods for cost estimation in software project management

    Science.gov (United States)

    Briciu, C. V.; Filip, I.; Indries, I. I.

    2016-02-01

    The speed in which the processes used in software development field have changed makes it very difficult the task of forecasting the overall costs for a software project. By many researchers, this task has been considered unachievable, but there is a group of scientist for which this task can be solved using the already known mathematical methods (e.g. multiple linear regressions) and the new techniques as genetic programming and neural networks. The paper presents a solution for building a model for the cost estimation models in the software project management using genetic algorithms starting from the PROMISE datasets related COCOMO 81 model. In the first part of the paper, a summary of the major achievements in the research area of finding a model for estimating the overall project costs is presented together with the description of the existing software development process models. In the last part, a basic proposal of a mathematical model of a genetic programming is proposed including here the description of the chosen fitness function and chromosome representation. The perspective of model described it linked with the current reality of the software development considering as basis the software product life cycle and the current challenges and innovations in the software development area. Based on the author's experiences and the analysis of the existing models and product lifecycle it was concluded that estimation models should be adapted with the new technologies and emerging systems and they depend largely by the chosen software development method.

  5. Project mobilisation

    International Nuclear Information System (INIS)

    Clark, J.; Limbrick, A.

    1996-01-01

    This paper identifies and reviews the issues to be addressed and the procedures to be followed during the mobilisation of projects using LFG as an energy source. Knowledge of the procedures involved in project mobilisation, their sequence and probable timescales, is essential for efficient project management. It is assumed that the majority of projects will be situated on existing, licensed landfill sites and, in addition to complying with the relevant conditions of the waste management licence and original planning consent, any proposed developments on the site will require a separate planning consent. Experience in the UK indicates that obtaining planning permission rarely constitutes a barrier to the development of schemes for the utilisation of LFG. Even so, an appreciation of the applicable environmental and planning legislation is essential as this will enable the developer to recognise the main concerns of the relevant planning authority at an early stage of the project, resulting in the preparation of an informed and well-structured application for planning permission. For a LFG utilisation scheme on an existing landfill site, the need to carry out an environmental assessment (EA) as part of the application for planning permission will, in vitually all cases, be discretionary. Even if not deemed necessary by the planning authority, an EA is a useful tool at the planning application stage, to identify and address potential problems and to support discussions with bodies such as the Environment Agency, from whom consents or authorisations may be required. Carrying out an EA can thus provide for more cost-effective project development and enhanced environmental protection. Typically, the principal contractual arrangements, such as the purchase of gas or the sale of electricity, will have been established before the project mobilisation phase. However, there are many other contractural arrangements that must be established, and consents and permits that may be

  6. A sustainability assessment of the Hostětín cider house project

    Directory of Open Access Journals (Sweden)

    Jan Labohý

    2015-03-01

    Full Text Available The article presents and assesses the Hostětín cider house – a sustainability oriented local economy project in the Czech Republic. The project is described in detail: its origin, development and operation, funding, and relationships with involved actors. The background of the sustainability indicators science and a comprehensive description of the project ena-bled the authors to propose complex indicators to assess sustainability of the project in relation to different kinds of capital according to Meadows. Sustainability characteristics are outlined with regards to the technology used, including energy resources, the apples used in the production process (which represent local cultural heritage, products or waste. Effects to the local economy are measured using the local multiplier effect indicator. The assessment suggests that the initial goals of the cider house project have been met and the project supports sustainable development.

  7. Design project of fast subcritical system 'Mala Lasta'

    International Nuclear Information System (INIS)

    Milosevic, M.; Stefanovic, D.; Popovic, D.; Pesic, M.; Zavaljevski, N.; Nikolic, D.; Arsenovic, M.

    1988-10-01

    This report contains two parts. Part one covers the objective and fundamental elements for the choice of fast subcritical system 'Mala Lasta', review of the existing fast subcritical assemblies, and a description of the available domestic computer codes applied for calculating neutron reactor parameters. Comparison of results obtained by these codes for a number of existing subcritical assemblies was used for the choice of the design project described in part two of this report. It contains detailed description of the operating parameters of the chosen subcritical system based on the obtained calculated parameters

  8. WEB 2.0 SERVICES AS A TECHNOLOGICAL FOUNDATION OF A NETWORK PROJECT

    Directory of Open Access Journals (Sweden)

    Tatiana Ivanovna Kanyanina

    2015-02-01

    Full Text Available In the light of the requirements of the federal state educational standard increases the value of the network design based on the use of Web 2.0 services. The article outlines the range of technological challenges faced by the developer of the network project, such as the choice of the network platform of the project, design tools and tools for project results placement, project coordination and organization of communication lines, the choice of instruments for the promotion of the project on the Internet. The main attention is focused on the examples of network services that address these challenges, and describe their features. The authors rely on the specific network projects implemented in Nizhny Novgorod region. The paper analyzes the possible project’s network sites (network environment. The article gives a general description of each environment, marks its distinctive features, advantages and disadvantages. The article presents project tasks’ examples, designed on the basis of the variety of Web 2.0 services that functionally meet the requirements of a particular task, examples of services to represent the project products and to summarize its results. Attention is paid to the organization of the lines of communication of the project participants and organizers and to the role of network services in the project promotion on the Internet.

  9. Project network-oriented materials management policy for complex projects

    DEFF Research Database (Denmark)

    Dixit, Vijaya; Srivastava, Rajiv K; Chaudhuri, Atanu

    2015-01-01

    This work devises a materials management policy integrated with project network characteristics of complex projects. It proposes a relative quantitative measure, overall criticality (OC), for prioritisation of items based on penalty incurred due to their non-availability. In complex projects...... managerial tacit knowledge which provides them enough flexibility to provide information in real form. Computed OC values can be used for items prioritisation and as shortage cost coefficient in inventory models. The revised materials management policy was applied to a shipbuilding project. OC values were......, practicing managers find it difficult to measure OC of items because of the subjective factors and intractable nature of penalties involved. However, using their experience, they can linguistically identify the antecedents and relate them to consequent OC. This work adopts Fuzzy Set Theory to capture...

  10. Building Project Competence

    DEFF Research Database (Denmark)

    Pemsel, Sofia; Wiewiora, Anna

    This research investigates the development of project competence, and particularly, three related dynamic capabilities (shifting, adapting, leveraging) that contribute to project competence development. In doing so, we make use of the emerging literature on knowledge governance and theorize how...... of dynamic capability building promoting project competence development....

  11. The Impact of Project Management Maturity upon IT/IS Project Management Outcomes

    Science.gov (United States)

    Carcillo, Anthony Joseph, Jr.

    2013-01-01

    Although it is assumed that increasing the institutionalization (or maturity) of project management in an organization leads to greater project success, the literature has diverse views. The purpose of this mixed methods study was to examine the correlation between project management maturity and IT/IS project outcomes. The sample consisted of two…

  12. Photovoltaic demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Kaut, W [Commission of the European Communities, Brussels (Belgium); Gillett, W B; Hacker, R J [Halcrow Gilbert Associates Ltd., Swindon (GB)

    1992-12-31

    This publication, comprising the proceedings of the fifth contractor`s meeting organized by the Commission of the European Communities, Directorate-General for Energy, provides an overview of the photovoltaic demonstration projects which have been supported in the framework of the energy demonstration programme since 1983. It includes reports by each of the contractors who submitted proposals in 1987 and 1988, describing progress within their projects. Projects accepted from earlier calls for proposals and not yet completed were reviewed by a rapporteur and are discussed in the summary section. The results of the performance monitoring of all projects and the lessons drawn from the practical experience of the projects are also presented in the summaries and conclusions. Contractors whose projects were submitted in 1989 were also present at the meeting and contributed to the reported discussions. This proceeding is divided into four sessions (General, Housing, technical presentations, other applications) and 24 papers are offered.

  13. Integrated Project Delivery (IPD Research Trends.

    Directory of Open Access Journals (Sweden)

    Kahvandi, Z.

    2017-07-01

    Full Text Available Integrated Project Delivery (IPD is introduced as a vibrant approach to enhance project implementation, having particular position in recent studies among construction researchers. This study analyzes the research trends on the field of IPD to provide an appropriate vision for future researchers in this specialized field. While so far no comprehensive research has been done in this field, this study provides a comprehensive review of existing studies through in-depth literature review method. This research evaluates studies conducted in the field of IPD, which is a basis for future researchers to improve conditions of IPD implementation in different countries. For that this study Using library studies, the trend of researches conducted on various concepts and domains during various years, has been investigated. Future studies can simply use the outputs of this research to shape their research flow on establishing continuing progress of IPD. The data obtained from descriptive analyses are illustrated quantitatively, followed by comprehensive analyses and discussion of the results. Moreover, this study concluded that during recent years, the trend of studies conducted about IPD has increased, particularly articles examined challenges. In the next step, more studies have been performed in the field of construction. Those articles are preferred that have evaluated principles, challenges, and solutions for resolving barriers. Proper IPD implementation facilitates enhanced share of information and early identification of stakeholders through a proper timing as vital keys to realize objectives of the construction projects, reduce risks, and increase the chance of project success.

  14. Towards an Ontology for the Global Geodynamics Project: Automated Extraction of Resource Descriptions from an XML-Based Data Model

    Science.gov (United States)

    Lumb, L. I.; Aldridge, K. D.

    2005-12-01

    Using the Earth Science Markup Language (ESML), an XML-based data model for the Global Geodynamics Project (GGP) was recently introduced [Lumb & Aldridge, Proc. HPCS 2005, Kotsireas & Stacey, eds., IEEE, 2005, 216-222]. This data model possesses several key attributes -i.e., it: makes use of XML schema; supports semi-structured ASCII format files; includes Earth Science affinities; and is on track for compliance with emerging Grid computing standards (e.g., the Global Grid Forum's Data Format Description Language, DFDL). Favorable attributes notwithstanding, metadata (i.e., data about data) was identified [Lumb & Aldridge, 2005] as a key challenge for progress in enabling the GGP for Grid computing. Even in projects of small-to-medium scale like the GGP, the manual introduction of metadata has the potential to be the rate-determining metric for progress. Fortunately, an automated approach for metadata introduction has recently emerged. Based on Gleaning Resource Descriptions from Dialects of Languages (GRDDL, http://www.w3.org/2004/01/rdxh/spec), this bottom-up approach allows for the extraction of Resource Description Format (RDF) representations from the XML-based data model (i.e., the ESML representation of GGP data) subject to rules of transformation articulated via eXtensible Stylesheet Language Transformations (XSLT). In addition to introducing relationships into the GGP data model, and thereby addressing the metadata requirement, the syntax and semantics of RDF comprise a requisite for a GGP ontology - i.e., ``the common words and concepts (the meaning) used to describe and represent an area of knowledge'' [Daconta et al., The Semantic Web, Wiley, 2003]. After briefly reviewing the XML-based model for the GGP, attention focuses on the automated extraction of an RDF representation via GRDDL with XSLT-delineated templates. This bottom-up approach, in tandem with a top-down approach based on the Protege integrated development environment for ontologies (http

  15. Knowledge Management in a Project Environment: Organisational CT and Project Influences

    OpenAIRE

    Polyaninova, Taya

    2011-01-01

    During a project implementation various forms of information and experience are generated within the organization. If this accumulated knowledge is not recorded and shared amongst other projects, this knowledge will be lost and no longer be available to assist future projects. This may lead to increased future projects costs as resources, time and money will be wasted on redefining the knowledge that once existed within the company. By not capturing and redeploying this knowledge, the quality...

  16. Using Project Complexity Determinations to Establish Required Levels of Project Rigor

    Energy Technology Data Exchange (ETDEWEB)

    Andrews, Thomas D.

    2015-10-01

    This presentation discusses the project complexity determination process that was developed by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office for implementation at the Nevada National Security Site (NNSS). The complexity determination process was developed to address the diversity of NNSS project types, size, and complexity; to fill the need for one procedure but with provision for tailoring the level of rigor to the project type, size, and complexity; and to provide consistent, repeatable, effective application of project management processes across the enterprise; and to achieve higher levels of efficiency in project delivery. These needs are illustrated by the wide diversity of NNSS projects: Defense Experimentation, Global Security, weapons tests, military training areas, sensor development and testing, training in realistic environments, intelligence community support, sensor development, environmental restoration/waste management, and disposal of radioactive waste, among others.

  17. Project time boxing and milestones as drivers for open design projects

    DEFF Research Database (Denmark)

    Tollestrup, Christian H. T.

    2015-01-01

    is very positive and that the structure, strict enforcement and rolling project management responsibility in a group work setting really helps them drive the project forward with high motivation. The main challenge lies in the balance between loading the teams with too many challenges and just providing......The Curriculums and programs in Problem Based Learning (PBL) utilizes the project-format in a team based setting for rehearsing the competencies of applying the design-oriented skills and knowledge learned in courses and workshops. If the project period is self-organised, there is a tendency......, because of the facilitated format where ‘disturbances’ are eliminated. If successful the state of creative flow is achieved. So how can we create a sense of urgency in longer project periods, not just workshop format, that would help a team of design students to engage and drive the project from the start...

  18. INVAP and its project management capabilities: a key to company success

    International Nuclear Information System (INIS)

    Salvatore, Marcelo; Delgado, Ricardo; Niklison, Carlos; Ordonez, Juan Pablo; Gerbino, Juan Jose Gil

    2002-01-01

    Over the past 26 years, several factors have contributed to INVAP's projection into domestic and overseas operations. Of these, the most recognized is of course the technological capabilities INVAP keeps developing to satisfy our customer's requirements. In a second thought, the other factor is the strategic objective of providing specific purpose customer oriented solutions. The less obvious third important factor in this trilogy is the successful application of Project Management techniques and methods. INVAP's vision on Project Management encompasses well known concepts as: Integrated Management, Proactive solutions, Cost Control and Reporting, Quality Assurance, Target Schedules, Performance Requirements, Risk Management, Configuration Management and Integrated Logistic Support. After 2 years of execution of the Replacement Research Reactor Project for the Australian Nuclear Science and Technology Organization, our Project Management methodology have allowed us to timely meet all project milestones, complete basic and detail engineering, timely deliver the preliminary safety reports, manufacture and test technological concepts in specifically built mock ups and overcome risky situations -like the economical panorama in Argentina- without jeopardizing our Contractual commitments. Present paper depicts the practical approach INVAP has for Project Management -particularly within the Nuclear Division-, and a description of the tools to such aim developed. (author)

  19. The Eurodif program. Present status of the project

    International Nuclear Information System (INIS)

    Besse, G.

    1975-01-01

    The reasons which led Eurodif to decide for the gaseous diffusion process and the benefits which such process offers for the present time are presented. The realization of the Eurodif project (description of the plant, time schedule of the realization, electric power supply, production time-schedule) is discussed. The Eurodif marketing policy, present and future, is reported [fr

  20. Projection Models 2010

    DEFF Research Database (Denmark)

    Illerup, J. B.; Birr-Pedersen, K.; Mikkelsen, M. H

    Models for projection of SO2-, NOx-, NMVOC- and NH3-emissions to the atmosphere have been developed and the Danish emissions have been projected until 2010 from a basis scenario including all implemented and planned measures. The projections of the four pollutants indicate that it may be difficult...