WorldWideScience

Sample records for project presently work

  1. Keynote presentation: Project Management, Technology and Evolving Work Processes

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    not be used in the workplace when students graduate, but rather on the ”engine” of problem solving and communication strategies which drives projects and affects project success from the stakeholders point of view. Once students understand the engine, they are able to not only use software tools...... management documents looked like, but also how these documents are interconnected and work together to solve a problem. In addition, as they were in communication with a real client, they needed to work iteratively, ch anging their understanding of the problem, which in turn changed their options for solving...... the problem as well as planning and communicating the solution. This dynamic participation in problem solving helped students gain experience beyond recognition and reproduction  Campus Encounters – Bridging Learners Conference “Developing Competences for Next Generation Service Sectors” April 13–14, 2011...

  2. RadWorks Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The RadWorks project's overarching objective is the maturation and demonstration of affordable, enabling solutions to the radiation-related challenges presented to...

  3. Distributed Project Work

    DEFF Research Database (Denmark)

    Borch, Ole; Kirkegaard, B.; Knudsen, Morten

    1998-01-01

    Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work in a distr......Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work...... in a distributed fashion over the Internet needs more attention to the interaction protocol since the physical group room is not existing. The purpose in this paper is to develop a method for online project work by using the product: Basic Support for Cooperative Work (BSCV). An analysis of a well-proven protocol...... for information exchange in the traditional project environment is performed. A group of teachers and a student group using small project examples test the method. The first test group used a prototype for testing and found the new activity synchronization difficult to adapt, so the method was finally adjusted...

  4. Distributed Project Work

    DEFF Research Database (Denmark)

    Borch, Ole; Kirkegaard, B.; Knudsen, Morten

    1998-01-01

    for information exchange in the traditional project environment is performed. A group of teachers and a student group using small project examples test the method. The first test group used a prototype for testing and found the new activity synchronization difficult to adapt, so the method was finally adjusted...... to be very precises and with success used on the second test group. Distributed project work is coming pretty soon and with little improvement in server tools, projects in different topics with a large and inhomogeneous profile of users are realistic.......Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work...

  5. Perspectives on projects, project success and team work

    OpenAIRE

    Thompson, Karen

    2015-01-01

    This paper brings together perspectives on projects, project success and team work as a background to two graphical tools for considering project success and individual capabilities for working in a project team.

  6. DIPLOMA PROJECT TEAM WORK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    V. S. Kruglyk

    2014-04-01

    Full Text Available During the work performance students should get the maximal approach to the process of real project execution, so the project should include the need to use the latest technology, integration of data or services with different developments, architecture design, interaction of the team members and others. Implementation of graduation projects is the useful activity for the acquisition and consolidation of key IT competencies. Since the task of educational projects is maximal close to real one, students participate almost in all typical stages of commercial product’s development, and do so successfully. This is also confirmed practically: students, who were actively engaged in some projects at the university, have key positions in IT companies of the city and country after that. The main objective of the paper is to describe the organization of a common group students’ work on a degree project, implementation peculiarity of such projects, recommendations for improving the quality of projects. Thus, the paper is devoted to the peculiarities of the joint students’ work on a project during diploma execution in IT specialties, as the final part of the acquisition and consolidation process of key IT competencies of future programmers. The problem of choosing work topic, project concept, work organization in a group, implementation process organization has been considered. Also the specific stages of software development have been considered: development of interface, choice of technology, product quality, project disposal to the next developers, project completion.

  7. Project Work in Networked Distance Education

    DEFF Research Database (Denmark)

    Knudsen, Morten; Helbo, Jan; Jensen, Lars Peter

    2000-01-01

    -study, whereas the project study form is based on collaboration and dialogue. Consequently, successful implementation of project work in distance education requires extensive utilisation of new information and communication technology. In this paper the experiences of project work in a new Master of Industrial...... devoted to courses and the other half to project work. A computer conference system, LuvitÒ provides facilities for the courses, as well as structured synchronous and asynchronous communication. Eight times per year two-day seminars are held at the university for intensive lectures, project work......Problem oriented project work has been the foundation for the educational system at Aalborg University since its start 25 years ago. The duration of each student project is one semester, and the students spend half of their time working on the project in groups of typically 5-6 persons...

  8. Team work on international projects

    International Nuclear Information System (INIS)

    Hayfield, F.

    1983-01-01

    A successful team will result in Project efficiency and so lead to a better achievement of the Project objectives. Such a team will be self-motivating and have a high level of morale. An effective team will also create a better context for transfer of know-how and so better prepare its members for greater roles on future Project teams. The nature of Project work forces the process of team building to recognize several facts of life. A Project team can have a life as short as one year and as long as ten years. A team usually consists of people on temporary transfer from different departments yet retaining a link of some sort to their departments of origin. It may consist of members of one company only or of several as in a joint-venture and may include Client personnel. On International Projects, the members of a team may have different nationalities and be working in a language foreign to many of them. Many of the Project people may be expatriates to the Project area on a bachelor or on a married status well away from their head or usual office. Team building is a complex organizational and human process, with no mathematical formula for the ideal solution. It starts with the selection of the right Project Manager who should be a leader, a technocrat manager and an integrator all at the same time. The Project Manager must have the authority to create the organizational and human climate that will motivate to a maximum each member of the team. Each member must understand clearly his role and realize that this contribution to the Project will influence his career development. Loyalty to the Project Manager must be possible and the Departmental Manager has to recognize this necessity. This presentation will indicate the basic steps of a team building process on a typical major international Project

  9. Croatian repository construction project - present status and main obstacles

    International Nuclear Information System (INIS)

    Kucar Dragicevic, S.; Subasic, D.; Schaller, A.; Lokner, V.; Cerskov Klika, M.

    1999-01-01

    Croatia has been preparing backgrounds for the construction of the repository for low and intermediate radioactive waste on its territory, almost for a decade, now. In the name of Hrvtaska elektroprivreda, the co-owner of the NE Krsko, APO has been co-ordinating and organising numerous activities and projects during that time period. Siting process, safety assessment, disposal technology and repository design and public acceptance issues are the main fields of activities. The overall status of the project at the moment, including the overview of the present status of the main four aspects of activities, will be presented. Relatively, big and important progress made on the project work out during the last two years, as well as the main obstacles we were faced with during that time period, will be discussed.(author)

  10. Teaching mathematical modelling through project work

    DEFF Research Database (Denmark)

    Blomhøj, Morten; Kjeldsen, Tinne Hoff

    2006-01-01

    are reported in manners suitable for internet publication for colleagues. The reports and the related discussions reveal interesting dilemmas concerning the teaching of mathematical modelling and how to cope with these through “setting the scene” for the students modelling projects and through dialogues......The paper presents and analyses experiences from developing and running an in-service course in project work and mathematical modelling for mathematics teachers in the Danish gymnasium, e.g. upper secondary level, grade 10-12. The course objective is to support the teachers to develop, try out...... in their own classes, evaluate and report a project based problem oriented course in mathematical modelling. The in-service course runs over one semester and includes three seminars of 3, 1 and 2 days. Experiences show that the course objectives in general are fulfilled and that the course projects...

  11. Project Work in Networked Distance Education

    DEFF Research Database (Denmark)

    Knudsen, Morten; Helbo, Jan; Jensen, Lars Peter

    2000-01-01

    devoted to courses and the other half to project work. A computer conference system, LuvitÒ provides facilities for the courses, as well as structured synchronous and asynchronous communication. Eight times per year two-day seminars are held at the university for intensive lectures, project work......Problem oriented project work has been the foundation for the educational system at Aalborg University since its start 25 years ago. The duration of each student project is one semester, and the students spend half of their time working on the project in groups of typically 5-6 persons....... As the experience since then has proven this to be a very successful innovation in higher education [1], it seems to be an obvious idea also to base our new distance educations on the project study form. Traditionally, however, distance education has been characterized by one-way communication and self...

  12. Creatvity in Project Work

    DEFF Research Database (Denmark)

    Bjørner, Thomas; Kofoed, Lise B.; Bruun-Pedersen, Jon Ram

    2012-01-01

    that they are creative during all stages in the project work. However, it is also significant that the Medialogy students believe that they are more creative in the beginning of their projects and during the design and implementation stages, whereas the analysis is a less creative part. In general, the Medialogy...

  13. Reconfiguring Cooperative Work by Visualizing EPR on Large Projected Screens

    DEFF Research Database (Denmark)

    Simonsen, Jesper

    Simonsen, J. (2006): Reconfiguring Cooperative Work by Visualizing EPR on Large Projected Screens, Paper presented at the PDC 2006 workshop on: Reconfiguring Healthcare: Issues in Computer Supported Cooperative Work in Healthcare Environments. Participatory Design Conference, Trento, Italy, August...

  14. Pilot Project Technology Business Case: Mobile Work Packages

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Ken [Idaho National Lab. (INL), Idaho Falls, ID (United States); Lawrie, Sean [ScottMadden, Inc., Raleigh, NC (United States); Niedermuller, Josef [ScottMadden, Inc., Raleigh, NC (United States)

    2015-05-01

    Performance advantages of the new pilot project technologies are widely acknowledged, but it has proven difficult for utilities to derive business cases for justifying investment in these new capabilities. Lack of a business case is often cited by utilities as a barrier to pursuing wide-scale application of digital technologies to nuclear plant work activities. The decision to move forward with funding usually hinges on demonstrating actual cost reductions that can be credited to budgets and thereby truly reduce O&M or capital costs. Technology enhancements, while enhancing work methods and making work more efficient, often fail to eliminate workload such that it changes overall staffing and material cost requirements. It is critical to demonstrate cost reductions or impacts on non-cost performance objectives in order for the business case to justify investment by nuclear operators. The Business Case Methodology (BCM) was developed in September of 2015 to frame the benefit side of II&C technologies to address the “benefit” side of the analysis—as opposed to the cost side—and how the organization evaluates discretionary projects (net present value (NPV), accounting effects of taxes, discount rates, etc.). The cost and analysis side is not particularly difficult for the organization and can usually be determined with a fair amount of precision (not withstanding implementation project cost overruns). It is in determining the “benefits” side of the analysis that utilities have more difficulty in technology projects and that is the focus of this methodology. The methodology is presented in the context of the entire process, but the tool provided is limited to determining the organizational benefits only. This report describes a the use of the BCM in building a business case for mobile work packages, which includes computer-based procedures and other automated elements of a work package. Key to those impacts will be identifying where the savings are

  15. Interdisciplinary Problem Oriented Project Work

    DEFF Research Database (Denmark)

    Blomhøj, Morten; Kjeldsen, Tinne Hoff

    2018-01-01

    In this chapter, we analyze the problem oriented project work practiced at the Bachelor Study Program in Natural Science (Nat Bach) at Roskilde University (RU) as a learning environment for developing students’ mathematical modelling competence. The projects are conducted in a rather sophisticated...... and radical learning environment grounded on the four pedagogical key principles of, problem orientation, participant directed group work, interdisciplinarity and exemplarity. We illustrate and discuss the interplay between the aim of developing the students’ modelling competence on the one hand...

  16. Why Phishing Works: Project for an Information Security Capstone Course

    Science.gov (United States)

    Pollacia, Lissa; Ding, Yan Zong; Yang, Seung

    2015-01-01

    This paper presents a project which was conducted in a capstone course in Information Security. The project focused on conducting research concerning the various aspects of phishing, such as why phishing works and who is more likely to be deceived by phishing. Students were guided through the process of conducting research: finding background and…

  17. Restucturing the Project Work Format

    DEFF Research Database (Denmark)

    Dupont, Søren

    2015-01-01

    The chapter is based on an evaluation of a pedagogical experiment at Roskilde University, the Antology Experiment. The objective of the experiment was to develop and expand the framework for project work through the production of anthologies compiled collectively by a number of project groups....... The novel aspects of the Anthology Experiment were most notably its magnitude and complexity. In this experiment the groups were totalling some 50 students who were working together. The experiment used a well-known publishing format from research, namely the anthology form, which usually focuses...... on a specific research topic and includes contributions from various researchers. In the Anthology Experiment, the project groups could be viewed as ‘research units’ that produce the contributions to the anthology. The complexity of the experiment offered challenges, both for students and supervisors...

  18. Electronic Resources Management Project Presentation 2012

    KAUST Repository

    Ramli, Rindra M.

    2012-01-01

    This presentation describes the electronic resources management project undertaken by the KAUST library. The objectives of this project is to migrate information from MS Sharepoint to Millennium ERM module. One of the advantages of this migration

  19. CRITICAL TEACHING WORK AS DIMENSION OF UNIVERSITY PROJECT

    Directory of Open Access Journals (Sweden)

    Roberto Leher

    2014-06-01

    Full Text Available The article analyzes the heteronomy of academic work in Brazil, particularly public higher education. It discusses the meaning of rupture of the national-developmentalist project by the irruption of the corporate-military coup and the combined process of coercion (AI-5/1968 and Decree 477/1969 and of the subordination of research and postgraduate studies to monopolistic capitalism in counterreformation of 1968, through programs to encourage science and technology geared to the concerns of bourgeois fractions that sustained the regime. Facing the processes of dispossession and alienation of academic work in the dictatorship, the study examines the organization of teaching movement, its first strikes and the centrality given to career university project of ANDES. Finally, it presents as deepening the dependent capitalism over the last three decades reoriented public university and private higher education, indicating effects on teaching work and the struggles for affirmation of the public sphere as antimercantile.

  20. A project management focused framework for assuring quality work processes

    Energy Technology Data Exchange (ETDEWEB)

    Gamsby, S.O.; Mize, J.D. [Allied Signal, Inc., Albuquerque, NM (United States). Federal Mfg. and Technologies; Reid, R.A. [New Mexico Univ., Albuquerque, NM (United States)

    1996-10-01

    Federal Manufacturing & Technologies/New Mexico (FM&T/NM) of AlliedSignal is an organization of approximately 300 associates providing operations support, engineering, and other technical services for DOE, New Mexico`s National Laboratories, etc. Work performed is primarily project-oriented and ranges from executing a major long-term contract for retrofitting and maintaining a large fleet of escort vehicles to creating a single, small, prototype electronic device for measuring radiation in a unique environment. FM&T/NM is functionally organized and operates in a classic matrix format with functional departments providing personnel with technical expertise, necessary physical resources, and administrative support to several project-based groups. Like most matrix-based organizations that provide support to diverse customers, FM&T/NM has encountered problems that occur when a group of project managers is expected to work together in using and scheduling a shared set of limited resources for the good of the organization as a whole. The framework for managing projects that we present focuses on developing, understanding, and managing the relationships between the functional organization structure, the system of work processes, and the management of projects. FM&T/NM retains its functional structure which primarily assigns personnel to work processes. The evolving role of the process leader focuses primarily on designing, managing, and improving the process, and the interactions among the subprocesses. The project manager is responsible for (1) translating customer requirements into product specifications, (2) determining the sequence of activities needed to meet project goals, (3) scheduling the required work processes, (4) monitoring project progress, (5) providing liaison between the customer and process leaders, and (6) having the desired product and/or service delivered to a satisfied customer in a timely manner.

  1.  Project Management as a Global Trend for Organization Work

    DEFF Research Database (Denmark)

    Kampf, Constance

    in multination and global companies, understanding the power of visual rhetoric, genre and writing processes in the context of project management documentation can be an advantage for technical communicators.  In addition, project management tools and online documentation spaces are objects which cross...... Project Management as a Global Trend for Organization Work: Implications for Technical Communication Project Management tools and processes offer a visual approach to producing knowledge about a project in order to complete it.  As project management practices are used with increasing frequency......-cultural teams use to function.  This presentation will explore the potential of Project Management to be tightly integrated in Technical Communication curricula through a communications approach to project management.  Questions for discussion include: How tightly is project management integrated into different...

  2. Problem-Oriented Project Work

    DEFF Research Database (Denmark)

    Olsen, Poul Bitsch; Pedersen, Nils Kaare

    This book is meant to support problem-oriented learning activities. Problem-orientation concerns the reasoning about lack of knowledge, while project work includes the ethnomethods that are practiced when collectives produce scientific knowledge. This book reflects particular methods related...

  3. Present status of spallation target development. JAERI/KEK Joint Project

    International Nuclear Information System (INIS)

    Hino, R.; Kaminaga, M.; Haga, K.

    2001-01-01

    The Japan Atomic Energy Research Institute (JAERI) and the High Energy Accelerator Research Organization (KEK) are promoting a plan to construct a neutron scattering facility under the JAERI/KEK Joint Project. Design and R and D works are being carried out vigorously for realizing the mercury target system consisting of the mercury target, moderators and reflectors working as a spallation neutron source, as well as a remote handling system for exchanging such components which will be highly irradiated. This report introduces an outline of the present status of design and development activities on the spallation target system. (author)

  4. Group Organized Project Work in Distance Education

    DEFF Research Database (Denmark)

    Helbo, Jan; Knudsen, Morten; Jensen, Lars Peter

    2001-01-01

    Project organized problem based learning is a successful concept for on-campus education at Aalborg University. Recently this "Aalborg concept" has been used in networked distance education as well. This paper describes the experiences from two years of Internet-mediated project work in a new...... Master of Information Technology education. The main conclusions are, that the project work is a strong learning motivator, enhancing peer collaboration, for off-campus students as well. However, the concept cannot be directly transferred to off-campus learning. The main reasons are that the students...... must communicate electronically, and that they are under a fierce time strain, studying part time and typically with a full time job and a family. In this paper, the main problems experienced with group organized project work in distance education are described, and some possible solutions are listed...

  5. Distribution automation and control support; Analysis and interpretation of DAC working group results for use in project planning

    Science.gov (United States)

    Klock, P.; Evans, D.

    1979-01-01

    The Executive Summary and Proceedings of the Working Group Meeting was analyzed to identify specific projects appropriate for Distribution Automation and Control DAC RD&D. Specific projects that should be undertaken in the DAC RD&D program were recommended. The projects are presented under broad categories of work selected based on ESC's interpretation of the results of the Working Group Meeting. Some of the projects are noted as utility industry projects. The ESC recommendations regarding program management are presented. Utility versus Government management responsibilities are noted.

  6. Bubbler condenser related research work. Present situation

    International Nuclear Information System (INIS)

    2001-02-01

    Intensive discussions within the OECD Support Group on 'VVER-440 Bubbler Condenser Containment Research Work' between 1991 and 1994 demonstrated the need for supplementary research work to achieve an adequate level of basic knowledge. In 1994, the European Commission (EC) asked for a specific 'VVER-440/213 Bubble Condenser Qualification Feasibility Study', which was finished early in 1996, confirming the need for additional research in this field. The Feasibility study formed the basis for the Bubble Condenser Experimental Qualification Project (BCEQ) with two separate experimental activities to be executed within the frame of the PHARE/TACIS 2.13/95 project of the European Commission. A first activity served to study the thermal-hydraulic phenomena and the associated structure dynamic interactions. This part of the project was performed at EREC, in Elektrogorsk, Russia. The design of the test facility was based on the prototypical bubbler condenser configuration for the Hungarian Paks nuclear power plant. A second activity addressed the structural integrity of certain components of the bubbler condenser steel structures under DBA-typical conditions. This part of the project was performed at VUEZ, in Levice, Slovak Republic. The design of the components of this facility was based on the structural properties of the Dukovany and/or Bohunice nuclear power plants. A third component of the BCEQ project was specified later asking for analytical studies, which should be supported by a number of small-scale separate effects tests to be performed at SVUSS, in Bechovice, Czech Republic. The main experimental and analytical results of the BCEQ test campaigns have been presented and discussed within the frame of the 4. meeting of the Technical Advisory Committee to the BCEQ (Bubble Condenser Experimental Qualification) Project in Brussels in December 1999 and on occasion of the 11. OECD Support Group Meeting in Berlin in April 2000. The discussions had evidenced several

  7. Electronic Resources Management Project Presentation 2012

    KAUST Repository

    Ramli, Rindra M.

    2012-11-05

    This presentation describes the electronic resources management project undertaken by the KAUST library. The objectives of this project is to migrate information from MS Sharepoint to Millennium ERM module. One of the advantages of this migration is to consolidate all electronic resources into a single and centralized location. This would allow for better information sharing among library staff.

  8. SIHTI 2. Energy and environmental technology. Yearbook 1995. Project presentations

    International Nuclear Information System (INIS)

    Korhonen, M.; Thun, R.

    1997-01-01

    Detrimental impacts of various energy production forms, their prevention and costs to enterprises and to the society are studied in the National Research Programme on Energy and Environmental Technology - SIHTI 2. For this evaluation work databases on Finland's energy production, fuels and boilers and emissions of various production forms are needed. This is one of the main subtasks of the SIHTI Programme. Development of methods and tools required for environmental decision making and for the assessment of environmental costs and testing of their usability and reliability are equally important. Emission measurements are a problem field that continuously sets new challenges. In addition to energy production and its environmental impacts, environmental issues of the woodprocessing industries form another important research field of SIHTI 2 programme. A common aim of both fields is to reduce emissions of detrimental substances, to recycle raw materials, and to minimise and reuse wastes. Research and development projects are being carried out by a number of universities of different fields of science and technology, by research organisations and enterprises, and many projects are realised in close co-operation. In 1995, the programme comprised 28 R and D projects by universities and 22 enterprise-led projects. Results of these projects are presented in this yearbook. Part of the research projects continued from the preceding year and part were new projects continuing in 1996

  9. Team- and project work in engineering practices

    DEFF Research Database (Denmark)

    Buch, Anders; Andersen, Vibeke

    2015-01-01

    in teamwork practices, and, thirdly, how team- and project work affect engineering professionalism and collaborative work practices. A practice theoretical framework informs the analysis. Teamwork is investigated as a phenomenon enacted through the sayings, doings and relatings of practitioners in landscapes......In this paper we investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals. The paper investigates how professional engineering practices are enacted in two engineering...... consultancy companies in Denmark where teamwork has been or is an ideal for organizing work. Through a practice-based lens the article sets out to investigate, firstly, how discourses about teamand project work affect engineering work practices, secondly, how technology-mediated management is reconciled...

  10. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  11. Work Project Report

    CERN Document Server

    Sallinen, Roosa-Maria

    2015-01-01

    I worked in High Power Converters section (HPC). My supervisors were Karsten Kahle and Charles-Mathieu Genton. Our team consisted of us and Francisco Rafael Blanquez Delgado who also helped me if I had any problems. The team’s main assignment is to design the new Static Var Compensator (SVC) for MEQ59 in Meyrin. The idea is to standardise all the SVCs needed at CERN in order to make the design, installation and maintenance easier and more cost effective. This report describes my project at CERN.

  12. Team and Project Work in Engineering Practices

    Directory of Open Access Journals (Sweden)

    Anders Buch

    2015-11-01

    Full Text Available In this article, we investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals. The article investigates how professional engineering practices are enacted in two engineering consultancy companies in Denmark where teamwork has been or is an ideal for organizing work. Through a practice-based lens, the article sets out to investigate, firstly, how discourses about team and project work affect engineering work practices; secondly, how technologymediated management is reconciled in teamwork practices; and thirdly, how team and project work affect engineering professionalism and collaborative work practices. A practice theoretical framework informs the analysis. Teamwork is investigated as a phenomenon enacted through the sayings, doings and relatings of practitioners in landscapes of practices and the interconnectedness of the practices is traced through the setup of specific ecologies in the sites.

  13. Supporting Project Work with Information Technology

    DEFF Research Database (Denmark)

    Heilesen, Simon

    2015-01-01

    University problem-oriented project work is based. However, in implementing and integrating the new technologies in academic practices, a number of challenges have had to be addressed. This chapter discusses four of these challenges. The first is to provide a physical and virtual framework for learning......Like so many other institutions, Roskilde University has had to adapt to the new realities brought about by the rapid developments in information and communication technology (ICT). On the whole, ICT tools have proven to be helpful in supporting and developing the work forms on which Roskilde...... activities. The second is to direct student use of ICT in terms of making systems available and teaching academic computing. The third challenge is to supervise and conduct project work online and in blended learning environments. Finally, one must find a way to exploit the potentials of ICT in problem...

  14. Supporting Project Work with Information Technology

    DEFF Research Database (Denmark)

    Heilesen, Simon

    2015-01-01

    University problem-oriented project work is based. However, in implementing and integrating the new technologies in academic practices, a number of challenges have had to be addressed. This chapter discusses four of these challenges. The first is to provide a physical and virtual framework for learning...... activities. The second is to direct student use of ICT in terms of making systems available and teaching academic computing. The third challenge is to supervise and conduct project work online and in blended learning environments. Finally, one must find a way to exploit the potentials of ICT in problem......Like so many other institutions, Roskilde University has had to adapt to the new realities brought about by the rapid developments in information and communication technology (ICT). On the whole, ICT tools have proven to be helpful in supporting and developing the work forms on which Roskilde...

  15. Present status and future directions of the Mayo/IBM PACS project

    Science.gov (United States)

    Morin, Richard L.; Forbes, Glenn S.; Gehring, Dale G.; Salutz, James R.; Pavlicek, William

    1991-07-01

    This joint project began in 1988 and was motivated by the need to develop an alternative to the archival process in place at that time (magnetic tape) for magnetic resonance imaging and neurological computed tomography. In addition, this project was felt to be an important step in gaining the necessary clinical experience for the future implementation of various aspects of electronic imaging. The initial phase of the project was conceived and developed to prove the concept, test the fundamental components, and produce performance measurements for future work. The key functions of this phase centered on attachment of imaging equipment (GE Signa) and archival processes using a non-dedicated (institutionally supplied) local area network (LAN). Attachment of imaging equipment to the LAN was performed using commercially available devices (Ethernet, PS/2, Token Ring). Image data were converted to ACR/NEMA format with retention of the vendor specific header information. Performance measurements were encouraging and led to the design of following projects. The second phase has recently been concluded. The major features of this phase have been to greatly expand the network, put the network into clinical use, establish an efficient and useful viewing station, include diagnostic reports in the archive data, provide wide area network (WAN) capability via ISDN, and establish two-way real-time video between remote sites. This phase has heightened both departmental and institutional thought regarding various issues raised by electronic imaging. Much discussion regarding both present as well as future archival processes has occurred. The use of institutional LAN resources has proven to be adequate for the archival function examined thus far. Experiments to date have shown that use of dedicated resources will be necessary for retrieval activities at even a basic level. This report presents an overview of the background present status and future directions of the project.

  16. Work Breakdown Structures The Foundation for Project Management Excellence

    CERN Document Server

    Norman, Eric S; Fried, Robert T

    2011-01-01

    Understand and apply new concepts regarding Work Breakdown Structures The Work Breakdown Structure (WBS) has emerged as a foundational concept and tool in Project Management. It is an enabler that ensures clear definition and communication of project scope while performing a critical role as a monitoring and controlling tool. Created by the three experts who led the development of PMI's Practice Standard for Work Breakdown Structures, Second Edition, this much-needed text expands on what the standard covers and describes how to go about successfully implementing the WBS within the project life

  17. Papers presented at the 7th status report of the Reprocessing and Waste Treatment Project

    International Nuclear Information System (INIS)

    1988-10-01

    The report contains all lectures on the present state of the R+D work which were delivered on the occasion of the 7th seminar on the present state of the Reprocessing and Waste Treatment Project in the Karlsruhe Nuclear Research Centre on 15/16 March 1988. The project is aimed at improving methods for nuclear waste disposal with regard to the German reprocessing plant for light-water reactor fuels currently under construction in Wackersdorf. The individual contributions were separately adapted for the INIS and EDB data banks. (RB) [de

  18. Constructing new working practices through project narratives

    NARCIS (Netherlands)

    Veenswijk, M.B.; Berendse, M.

    2008-01-01

    In this article we focus on the (internal and external) dynamics of New Public Management (NPM) in the daily life of project management. We concentrate on the ways NPM concepts work out in the realities of project actors. Based on recent research within the Dutch infrastructure sector, we analyse

  19. Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach

    NARCIS (Netherlands)

    Miao, Yongwu; Sloep, Peter; Koper, Rob

    2009-01-01

    Miao, Y., Sloep, P. B., & Koper, R. (2009). Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach. Presented at the 'Open workshop of TENCompetence - Rethinking Learning and Employment at a Time of Economic Uncertainty-event'. November, 19, 2009,

  20. Project Work in Social Biology at GCE Advanced Level

    Science.gov (United States)

    Gadd, P.; Smith, S. Tyrell

    1977-01-01

    The system by which projects are submitted, modified, and approved is outlined and an indication is given of the standards and quantity of work expected. Criteria on which assessment is based are explained, the range of individual studies is summarized, and cases for and against project work are given. (Author/AJ)

  1. Which territorial integration of participative renewable energies? Present status and analysis of French projects. Final report

    International Nuclear Information System (INIS)

    Devisse, Jean-Stephane; Gilbert, Olivier; Reix, Fabien; GASPARD, Albane

    2016-02-01

    This study aimed at qualifying actors involved in projects (stakeholders, motivations, who decides what and how), at identifying the available resources (technical and financial abilities, project management abilities), at describing the mobilisation work and territorial dialogue processes, and at exploring how benefit distribution contributes to territorial dynamics. This study first identified participative renewable energy projects in France. A survey by questionnaire was then performed among project holders. Six projects have also been more deeply studied (a mix of solar and photovoltaic and wind energy, two wind farms located in two different regions, a solar photovoltaic project, a hydroelectric project, and a project on biomass from forest). After the methodology, the report defines what a participative renewable energy project is, proposes an overview of these projects in 2015, present the case studies, and proposes an analysis on the different aspects of the project process

  2. Service user integration into social work education: lessons learned from nordic participatory action projects.

    Science.gov (United States)

    Angelin, Anna

    2015-01-01

    Service users have lacked substantial influence, access, and participation in social work education in Norway and Sweden. In this article the author presents comparative analyses of two participatory projects that have developed and implemented practices that integrate service users into academic social work education and empower service users. The Norwegian HUSK project and the Social Work as Mobilization and Entrepreneurship course, also known as the "Mobilization course," at Lund University in Sweden demonstrate collaboration between research, social work education, and service users. The conclusions focus on the importance of the empowering processes by including recognition and dialogue, co-learning in practice, and the use of neutral venues to ensure effective user participation. The inclusion of service users in social work education can improve both practice and education.

  3. Underestimating Costs in Public Works Projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    2002-01-01

    This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... honest numbers should not trust the cost estimates and cost-benefit analyses produced by project promoters and their analysts. Independent estimates and analyses are needed as are institutional checks and balances to curb deception.......This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... estimates used to decide whether important infrastructure should be built are highly and systematically misleading. The result is continuous cost escalation of billions of dollars. The sample used in the study is the largest of its kind, allowing for the first time statistically valid conclusions regarding...

  4. Cost Underestimation in Public Works Projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent; Holm, Mette K. Skamris; Buhl, Søren L.

    This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... honest numbers should not trust the cost estimates and cost-benefit analyses produced by project promoters and their analysts. Independent estimates and analyses are needed as are institutional checks and balances to curb deception.......This article presents results from the first statistically significant study of cost escalation in transportation infrastructure projects. Based on a sample of 258 transportation infrastructure projects worth $90 billion (U.S.), it is found with overwhelming statistical significance that the cost...... estimates used to decide whether important infrastructure should be built are highly and systematically misleading. The result is continuous cost escalation of billions of dollars. The sample used in the study is the largest of its kind, allowing for the first time statistically valid conclusions regarding...

  5. Individual activities as an integrated part of project work - an innovative approach to project oriented and problem-based learning POPBL

    DEFF Research Database (Denmark)

    Moesby, Egon; Winther, Hans Henrik; Kørnøv, Lone

    2006-01-01

    in an individual activity to subsequently be separately assessed. The results of the individually oriented project work form the platform for final work with the project as a team. The students in each team are expected to evaluate the individual solutions and select the one solution to work on in the final phases......In this paper, the authors describe and, on the basis of a recently conducted survey, evaluate a way to increase student learning through the introduction of an individual project activity to the project oriented and problem-based and team-based project work - POPBL. This can be achieved not just...... by adding an individual activity outside or parallel to the project work, but by having the individual activity embedded as an integrated part of the overall team-based project work. In what the authors have deemed the extended project model, students work individually in the solution phase of the project...

  6. Information Presentation: Human Research Program - Space Human Factors and Habitability, Space Human Factors Engineering Project

    Science.gov (United States)

    Holden, Kristina L.; Sandor, Aniko; Thompson, Shelby G.; Kaiser, Mary K.; McCann, Robert S.; Begault, D. R.; Adelstein, B. D.; Beutter, B. R.; Wenzel, E. M.; Godfroy, M.; hide

    2010-01-01

    The goal of the Information Presentation Directed Research Project (DRP) is to address design questions related to the presentation of information to the crew. The major areas of work, or subtasks, within this DRP are: 1) Displays, 2) Controls, 3) Electronic Procedures and Fault Management, and 4) Human Performance Modeling. This DRP is a collaborative effort between researchers atJohnson Space Center and Ames Research Center. T

  7. Evaluation of the Work-Place Cooperative Project in Geography Degrees at the University of Leeds.

    Science.gov (United States)

    Hogg, James

    1998-01-01

    Describes the context and objective of a Work-Place Cooperative Project (WPCP) established in the School of Geography at the University of Leeds in 1995. The project presents students with business, commerce, industry, and environmental research issues that have geographical dimensions. Includes a number of examples from the WPCP. (MJP)

  8. The CAREM project: Present status and development activities

    International Nuclear Information System (INIS)

    Boado Magan, H.J.; Ordonez, J.P.; Hey, A.

    1997-01-01

    The CAREM Project is a low power NPP of 25 Mwe, with an integrated self pressurized primary system. The cooling of the primary system is of the natural circulation type and several passive safety systems are included. The owner of the Project is Argentina's CNEA (Comision Nacional de Energia Atomica) and its associated company, INVAP, is the main contractor. The present status of the CAREM Project is presented. The possible evolution of the CAREM project is mentioned in relation with a new containment design. A short description of the Experimental Facilities, listed below, already in operation and under construction are also included: CAPCN High Pressure Loop. Natural convection loop to verify dynamic response and critical heat flux; RA-8. Critical Facility, designed and constructed for the CAREM Project (that may be used as a general uses facility); RPV lnternals. The whole assembly of absorbent rods, connecting rods and the rode guides are being constructed in a 1:1 scale. The aims of this experimental facility are vibration analysis and manufacturing parameters definitions. Control Drive Mechanisms. A series of verification and tests are being carried out on these within RPV Hydraulically driven mechanisms. Other development activities are mentioned in relation with the thermalhydraulics, Steam Generators and Control. (author)

  9. Newsletter: work of the Committee and projects funded

    Energy Technology Data Exchange (ETDEWEB)

    1974-12-01

    Information about the work of the Committee is summarized. It has developed a series of project priorities. These are as follows in order of priority: projects that determine current and future energy demand; projects concerned with the conservation and more efficient use of energy; projects concerned with the assessment of indigenous energy resources; projects concerned with the assessment of the human, financial, and organizational resources for increasing energy production and use; projects concerned with economic, technological, and environmental aspects of energy use and production over the next 15 years and beyond the next 15 years. In addition, environmental and sociological projects are considered to be very important. All projects are required to have included consideration of environmental and sociological issues but there may also be specific environmental projects such as the one related to cooling water pond modelling (MCW)

  10. Present status and future of the sophisticated work station

    Science.gov (United States)

    Ishida, Haruhisa

    The excellency of the work station is explained, by comparing the functions of software and hardware of work station with those of personal computer. As one of the examples utilizing the functions of work station, desk top publishing is explained. By describing the competition between the Group of ATT · Sun Microsystems which intends to have the leadership by integrating Berkeley version which is most popular at this moment and System V version, and the group led by IBM, future of UNIX as OS of work station is predicted. Development of RISC processor, TRON Plan and Sigma Projects by MITI are also mentioned as its background.

  11. Present status of the SRRC Project

    International Nuclear Information System (INIS)

    Chang, C.; Cheng, K.C.; Liu, Y.C.; Tseng, P.K.

    1985-01-01

    Upon the recommendation of the overseas Chinese scholars and the feasibility study group organized by the National Science Council, the government approved the establishment of the Synchrotron Radiation Research Center (SRRC) on July 9, 1983. The main goal of the SRRC project is to construct and operate an up-to-date 1 GeV synchrotron radiation source, with three beam lines for general experiments, in five to six years; to provide local scientists and returned scientists from abroad a facility to carry out frontier researches in both basic and applied science; and to elevate the technological capabilities of the related industries, universities, and research institutes through the construction of the machine. The background and present status of the project are discussed

  12. Kazakhstan participation in International Experimental Reactor ITER Construction project. Work status and prospects

    International Nuclear Information System (INIS)

    Tazhibayeva, I.L.; Tukhvatullin, Sh.T.; Shestakov, V.P.; Kuznetsov, B.A.

    2002-01-01

    Kazakhstan takes part in ITER project in partnership with Russian Federation since the year of 1994. At present the technical stage of the project is completed and ITER Council should take a decision on the site for international reactor. Four countries such as Canada, Japan, Spain and France have offered their territories for being used as site for launching ITER construction. ITER partners started preparing new international agreement that will cover activities on construction, operation and decommissioning of ITER. It will also include the list of research and experimental work that is conducted in support of ITER project. Kazakhstan has already made an important contribution into technical stage realization of ITER project due to scientific and technical researches conducted by National Nuclear Center, by Institute of Experimental and Theoretical Physics and by JSC 'Ulba Metallurgical plant' ('UMP'). Research activity carried out for the support of ITER project is performed in accordance with the following main trends: Tritium safety (permeability and retentin of hydrogen isotopes during in-pile irradiation in various structural materials, co-deposed layers and protective coatings); Verification of computer codes (LOCA type) loss of coolant accidents modeling in ITER reactor; Investigation of liquid metal blanket of thermonuclear reactor (tritium production in lithium containing eutectics Li17Pb83 and ceramics Li 2 TiO 3 , study of tritium permeability). At present the working group of ITER project participants started introducing proposals for cost distribution and for placing the orders on reactor construction. Further Kazakhstan participation in ITER project may be in manufacturing high-tech parts and assemblies from commercial grades of beryllium. They will be used for armouring the reactor first wall, for its thermal protection and for protection of superconductor's components for magnetic systems that are at JSC U MP'. Scientific and technical support of

  13. Siberian Chemical Combine laboratory project work plan, fiscal year 1999

    International Nuclear Information System (INIS)

    Morgado, R.E.; Acobyan, R.; Shropsire, R.

    1998-01-01

    The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites' input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves

  14. Learning network theory : its contribution to our understanding of work-based learning projects and learning climate

    OpenAIRE

    Poell, R.F.; Moorsel, M.A.A.H. van

    1996-01-01

    This paper discusses the relevance of Van der Krogt's learning network theory (1995) for our understanding of the concepts of work-related learning projects and learning climate in organisations. The main assumptions of the learning network theory are presented and transferred to the level of learning groups in organisations. Four theoretical types of learning projects are distinguished. Four different approaches to the learning climate of work groups are compared to the approach offered by t...

  15. 49 CFR 30.13 - Restrictions on Federal public works projects: Certification.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Restrictions on Federal public works projects... WORKS CONTRACTS TO SUPPLIERS OF GOODS AND SERVICES OF COUNTRIES THAT DENY PROCUREMENT MARKET ACCESS TO U.S. CONTRACTORS § 30.13 Restrictions on Federal public works projects: Certification. As prescribed...

  16. 49 CFR 30.15 - Restrictions on Federal public works projects.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Restrictions on Federal public works projects. 30... CONTRACTS TO SUPPLIERS OF GOODS AND SERVICES OF COUNTRIES THAT DENY PROCUREMENT MARKET ACCESS TO U.S. CONTRACTORS § 30.15 Restrictions on Federal public works projects. The contracting officer shall insert the...

  17. Ergonomics work assessment in rural industrial settings: a student occupational therapy project.

    Science.gov (United States)

    Bowman, Peter J

    2012-01-01

    This case study describes a student occupational therapy (OT) program, the creation of a worksite assessment project as a part of a Community Connections: Partners for Learning and Service grant funded by Health Resources and Services Administration. The primary goals were to design occupation-based community learning experiences in a variety of rural community settings, so that students might benefit from participating in the community based learning and: based on the results, embed occupation-based learning into existing occupational therapy curriculum. The components of the project and the ergonomics content of the OT education program are described; details of the work assessment are presented with analysis of data from the student evaluation of this project.

  18. Cesium legacy safety project management work plan

    International Nuclear Information System (INIS)

    Durham, J.S.

    1998-01-01

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell)

  19. The Eurodif program. Present status of the project

    International Nuclear Information System (INIS)

    Besse, G.

    1975-01-01

    The reasons which led Eurodif to decide for the gaseous diffusion process and the benefits which such process offers for the present time are presented. The realization of the Eurodif project (description of the plant, time schedule of the realization, electric power supply, production time-schedule) is discussed. The Eurodif marketing policy, present and future, is reported [fr

  20. L2 Quality as a Competitive Edge - Project Presentation

    DEFF Research Database (Denmark)

    Ditlevsen, Marianne Grove; Kastberg, Peter

    2000-01-01

    In our paper we would like to present an interdisciplinary project "L2 as a Competitive Edge". We'll be doing this by first giving you a project overview in section 0. The overview will then in the section 1 and 2 be followed by a presentation of two of the most interesting themes, serving as point...... of departure for further discussion. The two themes are "The evaluation of language quality" and "Method - an Integrated Approach"....

  1. A feeling for Systems Development Work - Design of the ROSA project

    DEFF Research Database (Denmark)

    Bødker, Susanne; Greenbaum, Joan

    1988-01-01

    This article is based on the design of a research project that will look at intuition, learning processes, language and roles in the development of computer systems. The research project, called ROSA (a Danish acronym for Roles and Cooperation in Systems Development) grew out of our interest...... in the informal working practices among systems developers, because it is these informal working relationships that are most often overlooked in research about computer science methods and tools. The project applies a gender perspective to look at the informal work relations of systems developers. The concept...

  2. A Model to Investigate the Effect of Work Ethic Culture on Dynamics of Rework in Management of Projects

    Directory of Open Access Journals (Sweden)

    Hossein Kiani

    2018-03-01

    Full Text Available The present study aims to investigate the effect of work ethic culture on rework in construction projects through a review of literature, surveys, and interviews with project managers. The main research question is what mechanisms can project manager use to balance the costs of personnel training, financial and language incentives, and implementation costs to finish the project with more profit and less rework. In this regard, modelling and data analysis is done using System Dynamics methodology. The results show that by considering work ethic, rework in the project is reduced from 46 % to 39 %. However, the project has been completed with 10 % lower cost and 26 % lower variance. Integrating the issue of rework with the culture of work ethic in the field of project management by at least one exogenous parameter has been studied, while in this study qualitative parameters have been converted to quantitative parameters using fuzzy inference system. The change in management approach to the issue of work ethics and the formulation of human resource strategies of large projects by human resource managers is one of the applications of this study.

  3. Interdisciplinary Action in Halls of EJA: the projects work in the light of focus-cultural history

    Directory of Open Access Journals (Sweden)

    Cyntia Graziella Guizelim Simões Girotto

    2009-11-01

    Full Text Available This article aims to discuss the organization of work teaching in classrooms of Pejão (Program of Education for Youth and Adult - Unesp - Linda through the Work Projects, which underlie actions from the perspective of interdisciplinary Theory History-Culture. Pointing to the pedagogical implications of this conception of education, considering the formation of educating young adults and forth the use of time and space for education, production of knowledge, the procedure to information given to school subjects, the development / implementation / development / evaluation of projects of interdisciplinary work in the light of the focus vygotiskiano. Therefore, our gaze is theoretical and methodological back-up for a particular context: the classes of its shares in EJA interdisciplinary. Discuss such issues as follows: the first section, we present the general theory, discussing key concepts such as mediation, activity, learning, development, and then inserted the actions of students and educators of EJA. In a second section, we draw some lessons of that theory, to (re present and (re thinking projects in the EJA, resignified and resizing them by vygotiskiano bias.

  4. Exploring organisational competences in Human Factors and UX project work: managing careers, project tactics and organisational strategy.

    Science.gov (United States)

    Furniss, Dominic; Curzon, Paul; Blandford, Ann

    2018-06-01

    Organisational competence in Human Factors and UX (user experience) has not been looked at before despite its relevance to project success. We define organisational competence as the collective competence of the individuals, bringing together their complementary abilities to deliver an outcome that is typically more than the sum of its parts. Twenty-two UX and Human Factors practitioners were interviewed about their project work in two contrasting domains: web design and safety-critical systems to explore organisational competences. Through doing a FRAM analysis, 29 functions and 6 main areas of competences were identified: the central project process; the process of learning about the problem; maintaining and developing client relations; staff development; evolving practices; and the management of documentation for audit and quality control. These dynamic and situated competences form a web of interactions. Managing competences is essential for project success. Implications for managing careers, project tactics and organisational strategy are discussed. Practitioner Summary: Organisational competences impact how routine and non-routine project work is performed, but these have received little attention in the literature. Six key areas of competences in Human Factors and UX project work were identified from practitioner interviews. Managing combinations of adaptive competences is important for developing careers, project tactics and organisational strategies.

  5. Collaborative Projects: A Study of Paired Work in a Malaysian University.

    Science.gov (United States)

    Holmes, Richard

    2003-01-01

    Examines the project work of university students in a TESOL (Teaching of English as a Second Language) program in Malaysia. Compares phonetics and phonology projects completed by students working in pairs with those completed by students alone and reports student attitudes and strategies. (Author/LRW)

  6. 36 CFR 327.30 - Shoreline Management on Civil Works Projects.

    Science.gov (United States)

    2010-07-01

    ... ADMINISTERED BY THE CHIEF OF ENGINEERS § 327.30 Shoreline Management on Civil Works Projects. (a) Purpose. The... this regulation, shoreline management plans are not required for those projects where construction was... approval, one copy of each project Shoreline Management Plan will be forwarded to HQUSACE (CECW-ON) WASH DC...

  7. Studies in Teaching 1999 Research Digest. Research Projects Presented at Annual Research Forum (Winston-Salem, North Carolina, December 1999).

    Science.gov (United States)

    McCoy, Leah P., Ed.

    This publication presents a collection of research projects presented at the Annual Research Forum at Wake Forest University: "The Use of Group Work as an Effective Teaching Technique in Lower Level Spanish Classes" (James Blackburn); "What Are the Real Factors behind Student Motivation?" (Matthew Grey Burdick); "Can…

  8. Project Work Management Addressing the Needs of BVI Learners of EFL

    Directory of Open Access Journals (Sweden)

    Tatiana S. Makarova

    2017-12-01

    Full Text Available Introduction: it is known that inclusive education that opens access to education and facilitates students with special educational needs to socialize successfully is concentrated in special schools whilst mainstream teachers generally lack the methodology of teaching disabled students inclusively. The aim of the article is searching the best ways of educating students with special needs and providing specific conditions of the educational process in mainstream schools. Materials and Methods: the research is based on the results of fulfillment of a number of projects that deal with teaching and educating blind and visually impaired learners and in which all the authors of the article were involved. The problematic approach, the logical method and observation were applied to the research; analysis, comparison, generalization being the most important components of the study. The quantitative data were collected, analyzed and resumed as well. Results: the impact of project work implementation on academic and social skills development of blind and visually impaired students is shown and various types of projects that can be made by visually impaired learners are presented. The authors give their comments when analyzing different ways of adapting research activities to the needs of BVI learners. When speaking in detail on the role of web tools as maximizers of students’ potential the authors refer to their own experience in implementing web tools in project work with blind and visually impaired learners. Discussion and Conclusions: university teacher-training programs should be revised and improved by offering additional courses aimed at educating impaired students through doing research or project work. Special attention should be paid to developing the instructors’ project management skills in terms of teaching English as a foreign language to learners with special needs. It should be noted that different methods and various technological tools

  9. Infusing and sustaining aging content in social work education: findings from GeroRich projects.

    Science.gov (United States)

    Hash, Kristina M; Gottlieb, Jody; Harper-Dorton, Karen V; Crawley-Woods, Geraldine; Shelek-Furbee, Katherine; Smith, John David; Brown, Rita

    2007-01-01

    This article presents findings from experiences of 67 projects involved in GeroRich, an initiative funded by the John A. Hartford Foundation designed to infuse, enrich and sustain aging content in BSW and MSW curricula. Thematic qualitative analysis was used to uncover themes in answers to open-ended questions contained in End-of-Year 2 project reports. Content areas addressed by open-ended answers were: (1) successes and innovations, and (2) challenges requiring responses. Primary successes and innovations identified were as follows: curriculum enrichment, faculty and student involvement, student-learning activities and community. Challenges to be responded to were identified as lack of faculty involvement, competing demands on faculty and programs, and sustainability of project efforts. Examples of strategies implemented to overcome these obstacles include providing teaching resources, instituting financial and other supports, and developing strategic plans for sustaining content infusion post-funding. Experiences of the GeroRich projects offer practical considerations for other social work programs that accept the challenge of attracting and preparing students to work with the increasing population of older adults.

  10. The Impact of Project Work and the Writing Process Method on Writing Production

    Science.gov (United States)

    Díaz Ramírez, Marcela

    2014-01-01

    This article presents the outcomes of an investigation whose main goal was to implement the methodology of project work and a process approach in order to improve writing production in an English class of Colombian university students since their diagnostic tests showed that their written production had the lowest score. Based on data collected,…

  11. [Experience of knowledge translation in the ITSAL (immigration, work and health) research project with representatives of the target population].

    Science.gov (United States)

    Ronda, Elena; López-Jacob, M José; Paredes-Carbonell, Joan J; López, Pilar; Boix, Pere; García, Ana M

    2014-01-01

    This article describes the experience of knowledge translation between researchers of the ITSAL (immigration, work and health) project and representatives of organizations working with immigrants to discuss the results obtained in the project and future research lines. A meeting was held, attended by three researchers and 18 representatives from 11 institutions. Following a presentation of the methodology and results of the project, the participants discussed the results presented and research areas of interest, thus confirming matches between the two sides and obtaining proposals of interest for the ITSAL project. We understand the process described as an approach to social validation of some of the main results of this project. This experience has allowed us to open a channel of communication with the target population of the study, in line with the necessary two-way interaction between researchers and users. Copyright © 2013 SESPAS. Published by Elsevier Espana. All rights reserved.

  12. Site identification presentation: Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    1979-11-01

    The final step in the site identification process for the Basalt Waste Isolation Project is described. The candidate sites are identified. The site identification methodology is presented. The general objectives which must be met in selecting the final site are listed. Considerations used in the screening process are also listed. Summary tables of the guidelines used are included

  13. The Educational Work and Life Project Professional college student. A necessary relationship in Higher Education

    Directory of Open Access Journals (Sweden)

    Noraida Garbizo Flores Montes de Oca

    2014-06-01

    Full Text Available The new tendencies of the superior Cuban education, require of an educational renewing practice after contributing to the integral formation of the graduate future university, by achieving it harmonize the formation of sk ills and attitudes habits knowledges and the construction of a project of professional life sustained in values. In this sense the academic year constitutes the cell of the educational work to this level. Therefore at present it works try to get evaluate the necessary question between the educational labor and the project of professional life of the university student, with emphasis in the |protagónico| role of the social actors of the educational process.

  14. Behavioural changes experienced by contract managers while working on remote project sites

    OpenAIRE

    2012-01-01

    M.B.A. This research project is concerned with the behavioural changes of contract managers while working on 'remote' project sites. While working on such a project, the researcher became aware that the behaviour of certain contract managers changed over the course of the project, and that this behaviour was not the same as they demonstrated when at home or in the office environment. In many instances these behavioural changes were of a negative nature, the consequences of which often resu...

  15. Writing the Book…Literally: The Convergence of Authentic Intellectual Work (AIW) and Project-Based Learning (PBL)

    Science.gov (United States)

    Buckmiller, Tom M.; Kruse, Jerrid W.

    2015-01-01

    Using the Project-Based Learning (PBL) and Authentic Intellectual Work (AIW) models, we sought to create coursework that had value beyond the classroom. Refinements in the self-publishing book industry provide the opportunity to present student work to a larger audience and in a different, more engaging format. With the help of free software, our…

  16. The Competence for Project Team Members in the Conditions of Remote Working

    Directory of Open Access Journals (Sweden)

    Zdonek Iwona

    2017-02-01

    Full Text Available The article presents results of the qualitative research on competence of project team members in the conditions of remote working. These competences were considered in relation to different roles, which the members of such a team accept. The reference point to studied roles was the concept of Hansen and Allen authorships, and with regard to competence, the author's synthesis of deliberations above their models described in the literature.

  17. Waste management project fiscal year 1998 multi-year work plan WBS 1.2

    International Nuclear Information System (INIS)

    Slaybaugh, R.R.

    1997-08-01

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project

  18. Waste management project fiscal year 1998 multi-year work plan WBS 1.2

    Energy Technology Data Exchange (ETDEWEB)

    Slaybaugh, R.R.

    1997-08-29

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project.

  19. Pediatricians working part-time: past, present, and future.

    Science.gov (United States)

    Cull, William L; Mulvey, Holly J; O'Connor, Karen G; Sowell, Debra R; Berkowitz, Carol D; Britton, Carmelita V

    2002-06-01

    Pediatrics has consistently attracted a large number of women. Although the majority of practicing pediatricians are male, female pediatricians will soon constitute the majority. The challenge to balance personal and professional life is of particular concern to women, and part-time positions may provide a potential solution. To examine how many pediatricians currently work part-time, to examine trends in part-time employment from 1993 to present, to determine pediatric residents' interest in part-time employment, and to identify perceived barriers to part-time work. Two data sources were used for these analyses. The first was an American Academy of Pediatrics Periodic Survey from 1993 and 2000 asking a combined national sample of 3218 American Academy of Pediatrics members about their employment status. Multiple mailings were conducted for each survey producing an overall response rate of 62%. The second data source was a survey asking a national random sample of 500 pediatric residents completing training in 2000 about their job search experiences and attitudes toward part-time employment. Four mailings of this survey were completed, and responses were obtained from 71% of residents. The percentage of pediatricians working part-time increased from 11% in 1993 to 15% in 2000. This increase did not exceed what would be expected based on the rise in the percentage of pediatricians who are female from 36% in 1993 to 45% in 2000. On average, pediatricians working part-time provided 36% fewer direct patient care hours than full-time pediatricians (42 hours vs 27 hours). No statistically significant difference in direct patient care hours was apparent between male and female pediatricians working full-time. Female residents were more likely than male residents to consider part-time or reduced-hours positions (42% vs 14%) and to accept part-time or reduced-hours positions (14% vs 3%). Also, considerably more female residents (58%) than male residents (15%) indicated that

  20. Mirage project. Second summary progress report (Work period January to December 1984)

    International Nuclear Information System (INIS)

    Come, B.

    1985-01-01

    This report summarizes the second year of work (1984) in the CEC project MIRAGE on migration of radionuclides in the geosphere. It complements CEC reports EUR 9304 (Description of the project) and EUR 9543 (Works carried out in 1983) on the same topic

  1. The INCA project: present status and outlook

    International Nuclear Information System (INIS)

    Aleksandrov, K.V.; Ammosov, V.V.; Chechin, V.A.; Chubenko, A.P.; Erlykin, A.D.; Ladygin, E.A.; Merzon, G.I.; Mukhamedshin, R.A.; Murashov, V.N.; Pavlyuchenko, V.P.; Ryabov, V.A.; Ryazhskaya, O.G.; Saito, T.; Sobolevskii, N.M.; Shchepetov, A.L.; Starkov, N.I.; Trostin, I.S.; Tsarev, V.A.; Wolfendale, A.; Zatsepin, G.T.; Zhdanov, G.B.; Zhukov, A.P.

    2002-01-01

    Scientific objectives, foundations, status, and outlook of the INCA Project are presented. Fundamentally new technique based on the ionization-neutron calorimeter (INCA) and designed to study local nearby sources of high-energy cosmic rays by direct measuring the spectrum and composition of the nuclear component in the 'knee' region and the spectrum of primary electrons in the energy range 0.1-10 TeV with the proton-background suppression factor up to 10 7 is discussed. Experimental data on exposition of the INCA prototypes to electron, pion, and proton beams at various energies and corresponding simulation results are presented. Prospects are considered

  2. The net effects of the Project NetWork return-to-work case management experiment on participant earnings, benefit receipt, and other outcomes.

    Science.gov (United States)

    Kornfeld, R; Rupp, K

    2000-01-01

    The Social Security Administration (SSA) initiated Project NetWork in 1991 to test case management as a means of promoting employment among persons with disabilities. The demonstration, which targeted Social Security Disability Insurance (DI) beneficiaries and Supplemental Security Income (SSI) applicants and recipients, offered intensive outreach, work-incentive waivers, and case management/referral services. Participation in Project NetWork was voluntary. Volunteers were randomly assigned to the "treatment" group or the "control" group. Those assigned to the treatment group met individually with a case or referral manager who arranged for rehabilitation and employment services, helped clients develop an individual employment plan, and provided direct employment counseling services. Volunteers assigned to the control group could not receive services from Project NetWork but remained eligible for any employment assistance already available in their communities. For both treatment and control groups, the demonstration waived specific DI and SSI program rules considered to be work disincentives. The experimental impact study thus measures the incremental effects of case and referral management services. The eight demonstration sites were successful in implementing the experimental design roughly as planned. Project NetWork staff were able to recruit large numbers of participants and to provide rehabilitation and employment services on a substantial scale. Most of the sites easily reached their enrollment targets and were able to attract volunteers with demographic characteristics similar to those of the entire SSI and DI caseload and a broad range of moderate and severe disabilities. However, by many measures, volunteers were generally more "work-ready" than project eligible in the demonstration areas who did not volunteer to receive NetWork services. Project NetWork case management increased average annual earnings by $220 per year over the first 2 years following

  3. Past and present in work life

    NARCIS (Netherlands)

    Kats, Rachel

    1972-01-01

    The purpose of this analysis was to study multivariate relations between the mobility experiences of immigrant workers and their present work attitudes and behavior. The review of existïng research evidence, of the intricate mobility structure and of wark attitudes and behavior found in the data,

  4. Overview of the ACEX project iodine work

    International Nuclear Information System (INIS)

    Merilo, M.

    1996-01-01

    The ACEX project is an internationally sponsored research program that focuses on several aspects of severe accidents. The areas addressed are iodine behavior in containments, pool scrubbing, molten corium concrete interactions, and ex-vessel core debris coolability. These areas all represent extensions to the previous and current ACE and MACE programs respectively. The ACE-Phase B (iodine) project, and other recent research efforts, have clarified the roles of the important phenomena that influence iodine volatility in reactor containments during severe accidents. The ACE Iodine Chemistry Subcommittee concluded that even though enough data has been generated to support reasonably good quantification of the important phenomena, a few important areas remain where quantification is still uncertain. This is due to a lack of agreement on how to utilize the existing database, as well as the possible absence of critical test and/or property data. Technical resolution of the overall iodine behavior issue is therefore not feasible until these uncertainties are fully assessed and practical solutions have been identified, implemented, and verified. The overall objectives of the ACEX iodine research program are to ensure that the iodine database can be used to predict the airborne concentration of iodine, the conditions for iodine reservoir stability, and to provide a mechanistic understanding for these phenomena. The first phase of this work involves a comprehensive review and interpretation of the existing database in order to formulate practical strategies for dealing with significant uncertainties and/or deficiencies. Several projects are underway involving the effects of organic reactions and structural surface interactions. In addition effort is being expended on standardizing the aqueous iodine kinetics database, specifying useful mass transfer models, and defining methodology for pH prediction. The results of this work are expected to identify where additional data

  5. Jules Horowitz reactor - presentation of the project and progress report

    International Nuclear Information System (INIS)

    Ballagny, A.; Frachet, S.; Rommens, M.; Guigon, B.; Minguet, J.L.; Dupuy, J.P.; Leydier, C.

    2001-01-01

    The RJH project was launched by CEA some years ago, with the objective to replace, after 2010, the material testing reactors of the previous generation. The objectives are also: to realise a significant step in term of performances, to ensure a high flexibility of the design, in order to host in the future new experiments, which are not completely defined at the project stage, to reach a high level of safety, according to the best current practice. After a summary of the main experimental objectives of the facility, the present paper deals with a detailed technical presentation of the project, resulting from preliminary design studies. The following topics are covered successively: the main functionalities, the resulting design options and technical solutions, the layout of the nuclear facility. (orig.)

  6. Forms of presentism in the history of science. Rethinking the project of historical epistemology.

    Science.gov (United States)

    Loison, Laurent

    2016-12-01

    Since the late 1980s, presentism has seen a resurgence among some historians of science. Most of them draw a line between a good form of presentism and typical anachronism, but where the line should be drawn remains an open question. The present article aims at resolving this problem. In the first part I define the four main distinct forms of presentism at work in the history of science and the different purposes they serve. Based on this typology, the second part reconsiders what counts as anachronism, Whiggism and positivist history. This clarification is used as a basis to rethink the research program of historical epistemology in the third section. Throughout this article, I examine the conceptual core of historical epistemology more than its actual history, from Bachelard to Foucault or others. Its project should be defined - as Canguilhem suggested - as an attempt to account for both the contingency and the rationality of science. As such, historical epistemology is based on a complex fifth form of presentism, which I call critical presentism. The critical relation at stake not only works from the present to the past, because of the acknowledged rationality of science, but also from the past to the present because of the contingency and historicity of scientific knowledge. Copyright © 2016 Elsevier Ltd. All rights reserved.

  7. Legacy material work-off project

    International Nuclear Information System (INIS)

    Sloan, T.J.; Baker, D.H. IV

    1999-01-01

    Los Alamos National Laboratory (LANL) and its subcontractors recently completed a nine-month legacy material clean-up effort. Legacy materials were defined as chemicals, hazardous, non-hazardous, and both hazardous and radioactive (mixed), that no longer served a programmatic use and had no identified individual owner within the Laboratory. Once personnel identified the legacy materials, the items were transferred to Solid Waste Operation's (EM-SWO) control. Upon completing this process, the responsible division-level manager was required to certify that all non-radioactive hazardous and non-hazardous materials and acceptable mixed legacy materials had been identified and transferred to EM-SWO for proper handling or disposal. The major expense in this project was the cost of actual chemical and radiological analysis. This expense was the result of items not having an identified individual owner. The major benefit of this project is that LANL is now in an excellent position to implement its Integrated Safety Management (ISM) Plan, which requires the implementation of safe work practices, including requirements for removing unused items when vacating workspaces. Effective implementation of ISM will go a long way toward ensuring that legacy materials are no longer an issue at the Laboratory

  8. 13 CFR 305.4 - Projects for design and engineering work.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Projects for design and engineering work. 305.4 Section 305.4 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION... construction Project in a format and in sufficient quantity to permit advertisement and award of a construction...

  9. Human errors in test and maintenance of nuclear power plants. Nordic project work

    International Nuclear Information System (INIS)

    Andersson, H.; Liwaang, B.

    1985-08-01

    The present report is a summary of the NKA/LIT-1 project performed for the period 1981-1985. The report summarizes work on human error influence in test and calibration activities in nuclear power plants, reviews problems regarding optimization of the test intervals, organization of test and maintenance activities, and the analysis of human error contribution to the overall risk in test and mainenace tasks. (author)

  10. Effective utilization of maintenance staff in design and implementation of major project work

    International Nuclear Information System (INIS)

    Wyman, D.; Dingle, J.; Brown, R.

    1995-01-01

    The reorganization of Pickering Nuclear Division some 2 years ago resulted in the formation of the Projects and Modifications department. This department takes an integrated approach to manage all aspects of large projects at Pickering. The integration of Design, Drafting, Procurement, Construction and Operations functions into project teams represents a fundamental change to project management at Pickering. The development of integrated teams has great potential for reducing both the time and cost associated with project implementation, while at the same time improving the quality, and maintainability of the commissioned in service project. The Pickering Rehab organization 1989-1993, established to perform the rehab / retube of Units 3 and 4 had proven that a team environment will produce effective results. The outcome was astounding, critical categories such as Safety, Quality of Work, and Timeliness, had proven the team's effectiveness. The integration of operations maintenance staff into the project work activities is still evolving, and has probably required the most adaptation to change for both the former Construction and Operations organizations. Maximizing the utilization of the maintenance staff in the design and implementation of major project work will prove to be a key to a long term operating success of these projects. This paper will focus in on the effective usage of Maintenance staff in the design and implementation phases of major project work at Pickering, and on the benefits realized using this approach. It will be divided into 5 sections as indicated. 1. Past Project Shortfalls. 2. Benefits of the inclusion of Maintenance staff in the Calandria Vault Rehab Project. 3. Maintenance involvement in the Pickering 'A' Shutdown System Enhancement (SDSE) Project. 4. Challenges resulting from the inclusion of Maintenance staff project teams. 5. Summary. (author)

  11. WORK BREAKDOWN STRUCTURE FORMATION FOR IT-PROJECT OF INFORMATION SYSTEM DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    Виктор Макарович ЛЕВЫКИН

    2015-06-01

    Full Text Available The approach for modeling the structure of IT-works project to create an information system as a forest domain ontology. The main features of information technology to manage such IT-projects.

  12. Innovative Work Practices and Lessons Learned at the N Area Deactivation Project

    International Nuclear Information System (INIS)

    Day, R.S.

    1999-01-01

    This report identifies many of the lessons learned, innovations,and effective work practices that derived from activities supporting the N Area Deactivation Project at the U.S. Department of Energy's (DOE) Hanford Site. The work practices discussed in this report may be applicable and beneficial to similar projects throughout the DOE complex

  13. DEVELOPMENT OF DIGITAL COMPETENCIES OF PRIMARY SCHOOL TEACHERS THROUGH BUILDING KNOWLEDGE AND SKILLS FOR WORKING WITH VISUAL PROGRAMMING ENVIRONMENT WITHIN MATH PROJECT WORK

    Directory of Open Access Journals (Sweden)

    Rumyana Y. Papancheva

    2017-07-01

    Full Text Available The paper presents a review of the contemporary school, the digital generation and the need of teachers equipped with new knowledge and skills, in particular – basic programming skills. The last change of educational system in Bulgaria after the adoption of the new pre-school and general school education act is analysed. New primary school curricula and new standards for teacher’s qualification were implemented. The new school subject “Computer modelling” is presented. Some experience of the authors from project-based work in mathematics with teachers and students is described. The aim is the formation of skills of programming by working within Scratch – visual environment for block-based coding. Some conclusions and ideas for future work are formulated.

  14. EDITORIAL: Student undergraduate laboratory and project work

    Science.gov (United States)

    Schumacher, Dieter

    2007-05-01

    that new experiments which illustrate both fundamental physics and modern technology can be realized even with a small budget. Traditional labwork courses often provide a catalogue of well known experiments. The students must first learn the theoretical background. They then assemble the setup from specified equipment, collect the data and perform the default data processing. However, there is no way to learn to swim without water. In order to achieve a constructivist access to learning, 'project labs' are needed. In a project labwork course a small group of students works as a team on a mini research project. The students have to specify the question of research, develop a suitable experimental setup, conduct the experiment and find a suitable way to evaluate the data. Finally they must present their results e.g. in the framework of a public poster session. Three contributions refer to this approach, however they focus on different aspects: 'Project laboratory for first-year students' by Gorazd Planinšič, 'RealTime Physics: active learning laboratories' by David Sokoloff et al and 'Labs outside labs: miniprojects at a spring camp for future physics teachers' by Leos Dvorák. Is it possible to prepare the students specifically for project labwork? This question is answered by the contribution 'A new labwork course for physics students: devices, methods and research projects' by Knut Neumann and Manuela Welzel. The two main parts of the labwork course cover first experimental devices (e.g. multimeters, oscilloscopes, different sensors, operational amplifiers, step motors, AD/DA-converters). Then subjects such as data processing, consideration of measurement uncertainties, keeping records or using tools like LABVIEW etc are focused on. Another concrete proposal for a new curriculum is provided by James Sharp et al, in 'Computer based learning in an undergraduate physics laboratory: interfacing and instrument control using MATLAB'. One can well imagine that project labs

  15. Topical and working papers on nuclear power capacity projections

    International Nuclear Information System (INIS)

    As a part of the overall work programme of WG. 1, Sub-Group 1A/2A was formed jointly with WG. 2 and given the responsibility for estimating the growth of nuclear power up to the year 2025 and the associated demands for nuclear fuels, heavy water, enrichment and other fuel cycle services. In carrying out the first part of its task, the estimation of nuclear power capacity growth, sub-Group 1A/2A prepared 6 working papers which contain the following information: A critique of recent world energy demand forecasts; world energy demand and installed capacity to the year 2025; nuclear power growth projections 1977-2000 for developing countries; long range world nuclear power growth projections; INFCE forecasts of nuclear generating capacity 1985-2025

  16. General presentation of projects mechanisms

    International Nuclear Information System (INIS)

    2003-01-01

    This guide provides recommendations and tools to implement projects mechanisms, in the framework of the kyoto protocol. It precises the place of the projects mechanisms in the display of tools involved in the climatic change fight policies, at the national as international scale. It recalls the main characteristics and the rules of utilization and illustrates the corresponding interests. (A.L.B.)

  17. Completion of Launch Director Console Project and Other Support Work

    Science.gov (United States)

    Steinrock, Joshua G.

    2018-01-01

    There were four projects that I was a part of working on during the spring semester of 2018. This included the completion of the Launch Director Console (LDC) project and the completion and submission of a Concept of Operations (ConOps) document for the Record and Playback System (RPS) at the Launch Control Center (LCC), as well as supporting the implementation of a unit in RPS known as the CDP (Communication Data Processor). Also included was my support and mentorship of a High School robotics team that is sponsored by Kennedy Space Center. The LDC project is an innovative workstation to be used by the launch director for the future Space Launch System program. I worked on the fabrication and assembly of the final console. The ConOps on RPS is a technical document for which I produced supporting information and notes. All of this was done in the support of the IT Project Management Office (IT-F). The CDP is a subsystem that will eventually be installed in and operated by RPS.

  18. Work-Family Conflict, Perceived Organizational Support and Professional Commitment: A Mediation Mechanism for Chinese Project Professionals

    OpenAIRE

    Junwei Zheng; Guangdong Wu

    2018-01-01

    Projects are characterized by long working hours, complex tasks and being a kind of temporary organization. As such, work-family conflict is particularly prominent for project employees. This research examined whether and how work-family conflict affects professional commitment among Chinese project professionals. Research hypotheses were developed to explore the relationship between work-family conflict, professional commitment to the project and the mediating effects of perceived organizati...

  19. EASYTRACK Project: Work package 3

    DEFF Research Database (Denmark)

    Savio, Enrico; De Chiffre, Leonardo

    ). For this project, the Centre for Geometrical Metrology (CGM) at the Technical University of Denmark (DTU) has taken care of freeform measurements, in collaboration with the Dipartimento di Innovazione Meccanica e Gestionale (DIMEG) - University of Padova - Italy. The present report describes feasibility...... and experimental results of calibrations of freeform parts on CMMs as contribution to development of the ISO 15530 series of standards currently under consideration by the ISO TC 213/WG10....

  20. Learning network theory : its contribution to our understanding of work-based learning projects and learning climate

    NARCIS (Netherlands)

    Poell, R.F.; Moorsel, M.A.A.H. van

    1996-01-01

    This paper discusses the relevance of Van der Krogt's learning network theory (1995) for our understanding of the concepts of work-related learning projects and learning climate in organisations. The main assumptions of the learning network theory are presented and transferred to the level of

  1. Present status and future development of Qinshan nuclear power project

    International Nuclear Information System (INIS)

    Ouyang Yu

    1987-01-01

    Qinshan 300 MWe Nuclear power Project is the first domestically designed and constructed nuclear power plant in China. Here is a brief description of its progress in design work, equipment manufacture and site construction since the first structural concrete in March 1985. In Qinshan area four units of 600 MWe each are planned to be built with collaboration of proper foreign partners. (author)

  2. USL NASA/RECON project presentations at the 1985 ACM Computer Science Conference: Abstracts and visuals

    Science.gov (United States)

    Dominick, Wayne D. (Editor); Chum, Frank Y.; Gallagher, Suzy; Granier, Martin; Hall, Philip P.; Moreau, Dennis R.; Triantafyllopoulos, Spiros

    1985-01-01

    This Working Paper Series entry represents the abstracts and visuals associated with presentations delivered by six USL NASA/RECON research team members at the above named conference. The presentations highlight various aspects of NASA contract activities pursued by the participants as they relate to individual research projects. The titles of the six presentations are as follows: (1) The Specification and Design of a Distributed Workstation; (2) An Innovative, Multidisciplinary Educational Program in Interactive Information Storage and Retrieval; (3) Critical Comparative Analysis of the Major Commercial IS and R Systems; (4) Design Criteria for a PC-Based Common User Interface to Remote Information Systems; (5) The Design of an Object-Oriented Graphics Interface; and (6) Knowledge-Based Information Retrieval: Techniques and Applications.

  3. IMPLEMENTATION OF WORK LIFE QUALITY PROGRAMS WITH THE PROJECT MANAGEMENT MODEL

    Directory of Open Access Journals (Sweden)

    Maria Lúcia Granja Coutinho

    2010-06-01

    Full Text Available The research studies the implementation of Quality of Working Life (QWL programs using project management techniques. Quality of Work Life projects have undergone a constant increase in scope to the point where they currently involve such diverse themes as change in dietary habits, exercise, stress management, socio environmental responsibility, and adult education. The major focus of this research is to analyze the processes and knowledge areas of project management being used to deal with this increased scope. The managerial processes identified were divided into categories of preparation, structuring, execution, and conclusion. The knowledge areas studied were: communication, risks, human resources, and acquisitions. The firms studied included mid to large sized firms located in the north, southeast and south of Brazil. We interviewed managers, directors, CEOs, plant managers, and line managers as part of this effort. The results suggest that the project management practices used were ad hoc and based on day to day needs. They also suggest that sound project management practices are applicable to QWL programs in the firms we studied.

  4. Introducing an Innovative Project Management Framework for First Year Students – Project Work in a PBL Environment

    DEFF Research Database (Denmark)

    Kofoed, Lise B.; Møller, Michael Labovic

    2010-01-01

    Students at Aalborg University (AAU) in Denmark are educated according to the Aalborg Problem Based Learning (PBL) approach which entails working in groups and completing a project each semester. In accordance with this approach students are offered a course – Co-operation, Learning and Project...... in general acknowledge the benefits of thorough project plans and schedules, they often experience difficulties developing them and abiding by them. These experienced difficulties are caused by lack of motivation and competence within this particular area of project management. This paper describes how a new...

  5. Improvements of present radioactive beam facilities and new projects

    International Nuclear Information System (INIS)

    Mueller, A.C.

    1995-01-01

    A short overview is given over scheduled improvements of present radioactive beam facilities and of new projects. In order to put these into a coherent context the paper starts with a general section about the making of radioactive beams. (author)

  6. Working Group 7.0 Environmental Transport and Health Effects, Chernobyl Studies Project. Progress report, October 1994 -- March 1995

    International Nuclear Information System (INIS)

    Anspaugh, L.R.; Hendrickson, S.M.

    1995-01-01

    This document presents the details from the working group 7.0 Chernobyl Studies Project. This working group looked at the environmental transport and health effects from the fallout due to the meltdown of Chernobylsk-4 reactor. Topics include: hydrological transport; chromosome painting dosimetry; EPR, TL and OSL dosimetry; stochastic effects; thyroid studies; and leukemia studies

  7. Oil field rejuvenation work starts at 14 project sites

    International Nuclear Information System (INIS)

    Petzet, G.A.

    1992-01-01

    This paper reports that the U.S. Department of Energy and oil and gas companies have released more information about a joint effort to rejuvenate aging U.S. oil fields in danger of abandonment. Work is starting on 14 demonstration projects that could recover 21 million bbl of oil from the fluvial dominated deltaic (FDD) reservoirs in which they are conducted. Wider application of the same techniques, if they are successful, could results in addition of 6.3 billion bbl of reserves, nearly 25% of U.S. crude oil reserves. A multidisciplinary team approach is to be used, with as many as 11 operators, service companies, universities, or state agencies participating in each project. All of the projects will culminate in extensive technology transfer activities. Here are descriptions of the projects gleaned from public abstracts provided by the DOE contractors

  8. The Influence of tolerance on the Learning Processes in Project Group Work

    DEFF Research Database (Denmark)

    Wiberg, Merete

    This paper presents a moral perspective on group work in higher education by addressing tolerance as a moral value of practice which is intertwined with learning of disciplinary knowledge. The relevance of tolerance among students is discussed in relation to Dewey's ideas of learning through...... participation. A link between morality and learning via knowledge production is to be found in the concept of participation due to an understanding of education as constitutive for a democratic society.The aim is to sharpen and discuss the concept of tolerance with respect to both strength and limits...... of the concept. Project group work is an example of a social setting in an educational context where collaboration between students on the one hand is seen as a way to stimulate processes of learning  and on the other hand to strengthen social and moral competences. To be discussed in the paper is how group work...

  9. Site observational work plan for the UMTRA Project site at Falls City, Texas

    International Nuclear Information System (INIS)

    1995-06-01

    Produced by the US Department of Energy (DOE), this site observational work plan (SOWP) will be used to determine site-specific activities to comply with the US Environmental Protection Agency (EPA) ground water standards at this Uranium Mill Tailings Remedial Action (UMTRA) Project site. The purpose of the SOWP is to recommend a site-specific ground water compliance strategy at the Falls City UMTRA Project site. The Falls City SOWP presents a comprehensive summary of site hydrogeological data, delineates a conceptual model of the aquifer system, and discusses the origins of milling-related ground water contamination. It also defines the magnitude of ground water contamination, potential environmental and health risks associated with ground water contamination and data gaps, and targets a proposed compliance strategy

  10. Fundamental Aeronautics Program: Overview of Project Work in Supersonic Cruise Efficiency

    Science.gov (United States)

    Castner, Raymond

    2011-01-01

    The Supersonics Project, part of NASA?s Fundamental Aeronautics Program, contains a number of technical challenge areas which include sonic boom community response, airport noise, high altitude emissions, cruise efficiency, light weight durable engines/airframes, and integrated multi-discipline system design. This presentation provides an overview of the current (2011) activities in the supersonic cruise efficiency technical challenge, and is focused specifically on propulsion technologies. The intent is to develop and validate high-performance supersonic inlet and nozzle technologies. Additional work is planned for design and analysis tools for highly-integrated low-noise, low-boom applications. If successful, the payoffs include improved technologies and tools for optimized propulsion systems, propulsion technologies for a minimized sonic boom signature, and a balanced approach to meeting efficiency and community noise goals. In this propulsion area, the work is divided into advanced supersonic inlet concepts, advanced supersonic nozzle concepts, low fidelity computational tool development, high fidelity computational tools, and improved sensors and measurement capability. The current work in each area is summarized.

  11. Identification of Design Work Patterns by Retrospective Analysis of Work Sheets

    DEFF Research Database (Denmark)

    Hansen, Claus Thorp

    1999-01-01

    project is carried out where we seek to identify design work patterns by retrospective analysis of documentation created during design projects.An elements to satisfy the wish for an efficient design process could be to identify work patterns applied by engineering designers, evaluate these patterns...... with respect to their efficiency, and reuse the most efficient in future projects. Thus, the objective of this research is to analyse design projects in order to identify the work patterns applied. Based on an evaluation of identified work patterns we expect a recommendation of work patterns supporting...... an efficient design process can be established.In this paper we describe the analysis method, and present observations from analyses of three projects....

  12. Present status of the KISS project

    Science.gov (United States)

    Miyatake, H.; Wada, M.; Watanabe, X. Y.; Hirayama, Y.; Schury, P.; Ahmed, M.; Ishiyama, H.; Jeong, S. C.; Kakiguchi, Y.; Kimura, S.; Moon, J. Y.; Mukai, M.; Oyaizu, M.; Park, J. H.

    2018-04-01

    KISS project aims at finding an astrophysical condition for synthesizing r-process heavy element isotopes, which are characterized as the third peak in the solar abundance pattern. This is an experimental challenge in nuclear physics to measure ground and isomeric state properties of unknown nuclei around the region of N=126 isotones. So far we have constructed and developed new type of mass separation system, KISS (KEK Isotope Separation System) and performed measurements of lifetimes and hyperfine structures of some platinum and iridium neutron-rich radioactive isotopes by applying multi-nucleon transfer reactions and in-gas laser ionization and spectroscopy (IGLIS) methods. In this report, recent physics results, updated KISS performance, and future's research plan including a challenge of a systematic mass measurement with MRTOF (Multi-Reflection Time-Of-Flight mass spectrograph) are presented.

  13. Present status of the Zavratec remediation project

    International Nuclear Information System (INIS)

    Zeleznik, N.; Stepisnik, M.; Mele, I.

    1997-01-01

    In 1992 the responsibility for the remediation of the temporary storage of radioactive waste near Zavratec was assigned to the Agency for Radwaste Management. The project was divided into two phases. First, in a study, different options for remediation were considered. In the second phase, performed in 1996, the measurements, inventorying and repacking of radioactive waste were carried out. Simultaneously with these activities a programme for covering public relations was prepared. One of the results of the public relation campaign is also a 15-minute video film, which was prepared from documentary material recorded during remedial activities, and will be presented here. (author)

  14. Ergonomic project of the work and innovation in the virtual-actual dynamic: a theoretical-conceptual contribution

    Directory of Open Access Journals (Sweden)

    Gilbert Cardoso Bouyer

    2015-12-01

    Full Text Available The main purpose of this paper is to amplify the current theoretical scenario of “Ergonomics of Project” area, according to the knowledge creation/innovation theory, and his concepts of virtual and subjectivity in the Work. This theoretical-conceptual article aims to shed new light on the relations between innovation and present-day efforts toward a scientific theory of knowledge in the Work, with its complex structure of theories, hypotheses and disciplines. There is in this paper a new approach to understand  the Contemporary Ergonomic Project in a kind of Socio-Epistemological Engineering initiated by Markus F. Peschl in the University of Vienna. The methods employed were the systematic review and adaptation of Socio-Epistemological Engineering’s concepts in the actual context of epistemological and ontological principles of Ergonomics of Project.

  15. Work-Family Conflict, Perceived Organizational Support and Professional Commitment: A Mediation Mechanism for Chinese Project Professionals.

    Science.gov (United States)

    Zheng, Junwei; Wu, Guangdong

    2018-02-15

    Projects are characterized by long working hours, complex tasks and being a kind of temporary organization. As such, work-family conflict is particularly prominent for project employees. This research examined whether and how work-family conflict affects professional commitment among Chinese project professionals. Research hypotheses were developed to explore the relationship between work-family conflict, professional commitment to the project and the mediating effects of perceived organizational support. Data were collected from 327 project managers or professionals working in construction enterprises in China; data were analyzed using structural equation modeling, applying the bootstrapping method. Results showed that there were three dimensions of work-family conflict: time-based conflict, strain-based conflict and behavior-based conflict. There were two dimensions of perceived organizational support: emotional support and instrumental support. The study also tested the negative effect of work-family conflict on professional commitment and the positive effect of perceived organizational support on professional commitment. Specifically, time-based conflict and emotional support had positive effects on professional commitment. Perceived organizational support had a total mediating effect between work-family conflict and professional commitment. The strain-based conflict dimension of work-family conflict had negative impacts on professional commitment through perceived emotional support and instrumental support. Overall, our findings extend a better understanding of work-family conflict and professional commitment in the project setting and verify the importance of social support in balancing work and family and improving employee mobility.

  16. Work-Family Conflict, Perceived Organizational Support and Professional Commitment: A Mediation Mechanism for Chinese Project Professionals

    Science.gov (United States)

    2018-01-01

    Projects are characterized by long working hours, complex tasks and being a kind of temporary organization. As such, work-family conflict is particularly prominent for project employees. This research examined whether and how work-family conflict affects professional commitment among Chinese project professionals. Research hypotheses were developed to explore the relationship between work-family conflict, professional commitment to the project and the mediating effects of perceived organizational support. Data were collected from 327 project managers or professionals working in construction enterprises in China; data were analyzed using structural equation modeling, applying the bootstrapping method. Results showed that there were three dimensions of work-family conflict: time-based conflict, strain-based conflict and behavior-based conflict. There were two dimensions of perceived organizational support: emotional support and instrumental support. The study also tested the negative effect of work-family conflict on professional commitment and the positive effect of perceived organizational support on professional commitment. Specifically, time-based conflict and emotional support had positive effects on professional commitment. Perceived organizational support had a total mediating effect between work-family conflict and professional commitment. The strain-based conflict dimension of work-family conflict had negative impacts on professional commitment through perceived emotional support and instrumental support. Overall, our findings extend a better understanding of work-family conflict and professional commitment in the project setting and verify the importance of social support in balancing work and family and improving employee mobility. PMID:29462860

  17. Work-Family Conflict, Perceived Organizational Support and Professional Commitment: A Mediation Mechanism for Chinese Project Professionals

    Directory of Open Access Journals (Sweden)

    Junwei Zheng

    2018-02-01

    Full Text Available Projects are characterized by long working hours, complex tasks and being a kind of temporary organization. As such, work-family conflict is particularly prominent for project employees. This research examined whether and how work-family conflict affects professional commitment among Chinese project professionals. Research hypotheses were developed to explore the relationship between work-family conflict, professional commitment to the project and the mediating effects of perceived organizational support. Data were collected from 327 project managers or professionals working in construction enterprises in China; data were analyzed using structural equation modeling, applying the bootstrapping method. Results showed that there were three dimensions of work-family conflict: time-based conflict, strain-based conflict and behavior-based conflict. There were two dimensions of perceived organizational support: emotional support and instrumental support. The study also tested the negative effect of work-family conflict on professional commitment and the positive effect of perceived organizational support on professional commitment. Specifically, time-based conflict and emotional support had positive effects on professional commitment. Perceived organizational support had a total mediating effect between work-family conflict and professional commitment. The strain-based conflict dimension of work-family conflict had negative impacts on professional commitment through perceived emotional support and instrumental support. Overall, our findings extend a better understanding of work-family conflict and professional commitment in the project setting and verify the importance of social support in balancing work and family and improving employee mobility.

  18. Decommissioning of the research nuclear reactor WWR-S Magurele - Bucharest. General presentation of the project

    International Nuclear Information System (INIS)

    Dragulescu, Emilian; Dragusin, Mitica; Popa, Victor; Boicu, Alin; Tuca, Carmen; Iorga, Ioan; Vrabie, Ionut; Mustata, Carmen

    2003-01-01

    A decommissioning project was worked out concerning the nuclear facility research reactor WWR-S Magurele-Bucharest to remove the radioactive and hazardous materials and so to exclude any risk for human health and environment. The project involves the four phases named assessment, development, operations and closeout. There are two major parts to the assesment phase: preliminary characterisation and the review and decision-making process. Characterisation is needed to develop project baseline data, which should include sufficient chemical, physical, and radiological characterisation to meet planning needs. Based on the conclusions of these studies, possible decommissioning alternative will be analyzed and: the best alternative chosen, final goal identified, risk assessments are evaluated. Also, taken into account are: regulations supporting assessment, land use considerations, financial concerns, disposal availability, public involvement, technology developments. After a decommissioning alternative was chosen, detailed engineering will begin following appropriate regulatory guidance. The plan will include characterisation information, namely: review of decommissioning alternatives; justification for the selected alternative; provision for regulatory compliance; predictions of personnel exposure, radioactive waste volume, and cost. Other activities are: scheduling, preparation for decommissioning operations; coordination, documentation, characterization report, feasibility studies, Decommissioning Plan, project daily report, radiological survey, airborne sampling records, termination survey of the site. The operations imply: identification and sequencing the operations on contaminated materials, storing on site the wastes, awaiting processing or disposal, and packaging of materials for transport to processing or disposal facilities.The key operations are: worker protection, health and safety program, review of planing work, work area assessment, work area controls

  19. Stress analysis of HLW containers advanced test work Compas project

    International Nuclear Information System (INIS)

    Ove Arup and Partners

    1990-01-01

    The Compas project is concerned with the structural performance of metal overpacks which may be used to encapsulate vitrified high-level waste forms before disposal in deep geological repositories. This document describes the activities performed between June and August 1989 forming the advanced test work phase of this project. This is the culmination of two years' analysis and test work to demonstrate whether the analytical ability exists to model containers subjected to realistic loads. Three mild steel containers were designed and manufactured to be one-third scale models of a realistic HLW container, modified to represent the effect of anisotropic loading and to facilitate testing. The containers were tested under a uniform external pressure and all failed by buckling in the mid-body region. The outer surface of each container was comprehensively strain-gauged to provide strain history data at all positions of interest. In parallel with the test work, Compas project partners, from five different European countries, independently modelled the behaviour of each of the containers using their computer codes to predict the failure pressure and produce strain history data at a number of specified locations. The first axisymmetric container was well modelled but predictions for the remaining two non-axisymmetric containers were much more varied, with differences of up to 50% occurring between failure predictions and test data

  20. Fabrication and installment of hard-wired I and C works for the neutral beam injection system of the KSTAR project

    International Nuclear Information System (INIS)

    Jung, Ki Sok; Oh, Byung Hun; In, Sang Ryul; Yoon, Jae Sung

    2004-01-01

    Instrumentation and Control(I and C) of the neutral beam injection(NBI) system for the K-STAR national fusion research project has been working from the start of the project to answer diverse requests arising from various facets of the development and construction phases of the project. In a parallel effort with the software oriented I and C development, there has been existing an enormous amount of hard-wiring I and C works for the NBI facility to be developed and fabricated in schedule. Circuits and hardwired functions have been designed, tested, fabricated, and finally installed to the relevant parts of the system. Some examples of those hard-wired I and C works are related to the vacuum system, gas feeding system, arc detector circuit, ion source monitoring, bending magnet and calorimeter. They are one of those integral parts for the proper operation of the NBI system. Examples of those hard-wired I and C works are introduced in this presentation

  1. Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects

    Science.gov (United States)

    Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad

    2017-12-01

    One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.

  2. The rationale for selecting the method of calculation of project products coast (works, services

    Directory of Open Access Journals (Sweden)

    O. V. Molchanova

    2017-01-01

    Full Text Available In modern conditions of management it is necessary to develop a number of recommendations on the introduction of management accounting at state-owned enterprises that carry out revenue-generating activities or based on the right of economic management. It is necessary to apply the correct cost-accounting method for the production of products, works, services for a more rational calculation of the cost price. This will allow management personnel to receive timely objective information about their cost price, identify the feasibility of production and sales, justify the assortment, plan profits. The procedure for determining the cost price of the project products (works, services in the theory and practice of the state enterprise of the Astrakhan region “Kasprybproekt” is investigated in the work. With the existing practice of planning in design organizations, the planned cost price of design and survey works for established cost items is planned in the cost estimate for production by the design organization as a whole and by the types of work: design, survey and others, without subdividing it by orders (projects. According to this, accounting of the actual costs for work in the design organizations is based. The study showed that the state enterprise of the Astrakhan region “Kasprybproyekt” performs different projects with different execution periods; therefore, it is advisable to use one method of calculating the cost price - job (order costing method, and link it to the responsibility centers depending on the department of the performer. Based on the research of the used method to the cost price calculate of the project products (works, services in the state enterprise of the Astrakhan region “Kasprybproekt”, it was proposed to use the job (order costing method that allows to detail all the project costs without distorting the final financial result and optimize the project costs. If the calculation method is correctly determined

  3. Working capital management in the process of financial support of investment and construction projects and of the construction material industry

    Science.gov (United States)

    Danilochkina, Nadezhda; Lukmanova, Inessa; Roshchina, Olga; Voytolovskiy, Nikolay

    2018-03-01

    The article presents the analysis of working capital in the process of financial support of high-rise construction investment projects. The factors influencing the choice of the working capital management model were analyzed, the reasons of the change in the requirement for the values of current assets in the process of construction of high-rise facilities were determined. The author has developed the scheme of interrelation between production, operational and financial activity cycles of enterprises implementing investment projects of unique buildings and structures and made a comparative description of their financing sources.

  4. Wind Power Project Repowering: History, Economics, and Demand (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Lantz, E.

    2015-01-01

    This presentation summarizes a related NREL technical report and seeks to capture the current status of wind power project repowering in the U.S. and globally, analyze the economic and financial decision drivers that surround repowering, and to quantify the level and timing of demand for new turbine equipment to supply the repowering market.

  5. QCD machines - present and future

    International Nuclear Information System (INIS)

    Christ, N.H.

    1991-01-01

    The present status of the currently working and nearly working dedicated QCD machines is reviewed and proposals for future machines are discussed with particular emphasis on the QCD Teraflop Project in the US. (orig.)

  6. Transfer of innovation, knowledge and competencies on the care service for people with acquired disabilities: the European Project "Care for Work".

    Science.gov (United States)

    Barchitta, M; Fragapane, S; Consoli, M T; Pennisi, C; Agodi, A

    2012-01-01

    The growing needs of people with disabilities require to integrate this issue into public health in order to improve political feasibility and to ensure that disability will not be left off from any strategic table. The main aim of the "Care for Work" project was to provide training contents to help workers and unemployed people to adapt their knowledge, skills and competencies to the care services sector in order to facilitate their insertion in a new employment source. The partners participating in the project are Organizations from 5 European countries. The project has been divided into seven Work Packages (WPs): three transversal WPs and four specific WPs, each addressing specific activities necessary to achieve the final objectives of the project. The "Care for Work" learning environment contains specific information and training on the techniques for caring people with acquired physical disabilities, as text documents and short training films. The project combines e-learning (Web 2.0) and mobile learning providing a flexible training platform for workers of care services sector. The "Care for Work" project offers specific training addressed to meet the new existing needs of workers of the care services sector and/or unemployed people. All the information and results of the project are available on the web page: www.careforwork.eu, and the present article is part of the WP "Valorization".

  7. Photovoltaic Programme, Edition 2006. Summary report. Project list. Annual project reports 2005 (abstracts)

    Energy Technology Data Exchange (ETDEWEB)

    Nowak, S.

    2006-07-01

    This comprehensive, illustrated report for the Swiss Federal Office of Energy (SFOE) presents an overview of the work done as part of the 2005 research programme, along with the abstracts of the annual reports of the project leaders on research projects. It presents the programme's main points of focus, discusses the work done and the results obtained. Areas covered include cell technology (13 reports), solar modules and building integration (3 reports) , system technology (4 reports) as well as various further projects (5) that are connected with photovoltaics. Four further reports concern international co-operation. Further, several pilot and demonstration (P+D) projects are discussed. Lists of all research and development projects and pilot and demonstration projects are supplied. Work done at several institutions in Switzerland and at leading commercial companies is described.

  8. Promoting Safe Work for Young Workers: A Community-Based Approach. A Resource Guide Documenting the Experiences of Three Young Worker Projects.

    Science.gov (United States)

    Bush, Diane; Gonzalez-Arroyo, Michele; Stock, Laura; Delp, Linda; Miara, Christine; Dewey, Robin; Sinclair, Raymond C.; Ortega, Maria J.

    This guide presents the lessons learned from three health education projects that focused on young worker issues and were funded by the National Institute for Occupational Safety and Health. In these projects, occupational health educators worked for 3 years, in three different communities, to raise the awareness of young worker issues, including…

  9. Site observational work plan for the UMTRA Project site at Spook, Wyoming

    International Nuclear Information System (INIS)

    1995-05-01

    The Spook, Wyoming, site observational work plan proposes site-specific activities to achieve compliance with Subpart B of 40 CFR Part 192 (1994) of the final US Environmental Protection Agency (EPA) ground water protection standards 60 FR 2854 (1995) at this Uranium Mill Tailing Remedial Action (UMTRA) Project site. This draft SOWP presents a comprehensive summary of existing site characterization data, a conceptual site model of the nature and extent of ground water contamination, exposure pathways, and potential impact to human health and the environment. Section 2.0 describes the requirements for meeting ground water standards at UMTRA Project sites. Section 3.0 defines past and current conditions, describes potential environmental and human health risks, and provides site-specific data that supports the selection of a proposed ground water compliance strategy. Section 4.0 provides the justification for selecting the proposed ground water compliance strategy based on the framework defined in the ground water programmatic environmental impact statement (PEIS)

  10. Information Presentation

    Science.gov (United States)

    Holden, K.L.; Boyer, J.L.; Sandor, A.; Thompson, S.G.; McCann, R.S.; Begault, D.R.; Adelstein, B.D.; Beutter, B.R.; Stone, L.S.

    2009-01-01

    The goal of the Information Presentation Directed Research Project (DRP) is to address design questions related to the presentation of information to the crew. The major areas of work, or subtasks, within this DRP are: 1) Displays, 2) Controls, 3) Electronic Procedures and Fault Management, and 4) Human Performance Modeling. This DRP is a collaborative effort between researchers at Johnson Space Center and Ames Research Center.

  11. How is the artist role affected when artists are participating in projects in work life?

    Science.gov (United States)

    Stenberg, Henrik

    2016-01-01

    In Sweden, during the last decade, the artist has come to function as a creative resource in workplaces. There are two organisations, Skiss (Contemporary Artist in the Contemporary Society) and Airis (Artist in Residence), that organise projects for artists and coworkers. These projects are intended to have a positive effect on the well-being of organisations and their employees through artistic means, and the artist often focuses on the social interaction between the employees in their work. The artists' work involves frequent interaction with coworkers. The aim of this article was to describe how visual artists' roles as artists are affected by their engagement in artistic and social projects at workplaces in Sweden. The focus in the article is on the social interaction between artists and employees. The study is a qualitative narrative interview study with fine artists participating in different projects in work life. Since the artist's intervention is usually directed towards social relations in the workplaces, a social perspective on well-being is from a micro-sociological point of view. The categories in the interviews were how the artists worked with the projects, how the social interaction between artists and coworkers worked out, and how the artists evaluated the projects in relation to their ambitions. The results show that, many times, the artistic projects promote well-being in organisations and to some extent benefit the artist, but that the ability of the artists to actually function as artists can be problematic.

  12. A Collaborative Approach to Defining the Usefulness of Impact: Lessons from a Knowledge Exchange Project Involving Academics and Social Work Practitioners

    Science.gov (United States)

    Wilkinson, Heather; Gallagher, Michael; Smith, Mark

    2012-01-01

    This paper reports on a knowledge exchange project involving academics and practitioners in six local authority social work departments. It contributes to recent debates about the coproduction of knowledge, presenting findings in three key areas: the importance of relationships for knowledge exchange; "what works" for practitioners…

  13. Developing Mathematical Literacy through project work: A teacher/teaching perspective

    Directory of Open Access Journals (Sweden)

    Renuka Vithal

    2006-10-01

    Full Text Available The implementation of the new Mathematical Literacy curriculum in South Africa is assuming several different conceptions of mathematics and therefore also being realised through a range of different pedagogies. In this paper I begin from a particular privileging of a critical perspective in mathematics education, which I argue is one (among others of the forces shaping the new South African curriculum reforms, particularly the Mathematical Literacy curriculum. If so, then the case for a specific pedagogy, that of project work, can be shown to support the development of a mathematical literacy from a critical perspective. In this paper a particular set of conceptual tools, principles and practices associated with project work, as developed in the Scandanavian context but researched in South Africa, are elaborated from the perspective of teachers/teaching of mathematical literacy.

  14. Presentation of radioecology in the Scandinavian countries

    International Nuclear Information System (INIS)

    Agnedal, P.O.

    1980-01-01

    One of the working groups dealt with the activity of the committee and in its report it is said that three types for the joint Scandinavian work could be identified: 1. - Projects. 2. - Conferences and training-courses. 3. - Publications and information. Among projects 'Intercalibration' regarding sampling techniques and analytical methods. Transport models, consequences of large accidents, were mentioned and in other groups the same type of projects was given. Another working group dealt with international cooperation in the field of radioecology and in its report it was said that it is important to present the work performed in the Scandinavian countries

  15. RFP to work on formation flying capabilities for spacecrafts for the GRACE project

    DEFF Research Database (Denmark)

    Riis, Troels; Thuesen, Gøsta; Kilsgaard, Søren

    1999-01-01

    The National Aeronautics and Space Agency of USA, NASA, are working on formation flying capabilities for spacecrafts, GRACE Project. IAU and JPL are developing the inter spacecraft attitude link to be used on the two spacecrafts.......The National Aeronautics and Space Agency of USA, NASA, are working on formation flying capabilities for spacecrafts, GRACE Project. IAU and JPL are developing the inter spacecraft attitude link to be used on the two spacecrafts....

  16. Factors of human capital related to project success in health care work units.

    Science.gov (United States)

    Suhonen, Marjo; Paasivaara, Leena

    2011-03-01

    To explore factors of human capital related to project success that employees expect from nurse managers. Human capital refers to those resources that managers working with projects possess, such as abilities, knowledge and qualities of character. The data were collected by open interviews (n=14) with nurses, public health nurses and nurse managers working in primary health care and a hospital. Data analysis was carried out using qualitative content analysis. The main factors of human capital related to project success proved to be as follows: (1) management of enthusiastic project culture, (2) management of regeneration and (3) management of emotional intelligence. Future research is needed on the kind of means nurse managers use in human capital management in projects and how they see their possibilities in managing human capital. Human capital management skills should be underlined as an important competence area when recruiting a nurse manager. The success of health care projects cannot be improved only through education or by training of nurse managers; in addition, projects need nurse managers who understand workplace spirituality and have high emotional intelligence. © 2011 The Authors. Journal compilation © 2011 Blackwell Publishing Ltd.

  17. Onshore wind energy potential over Iberia: present and future projections

    Science.gov (United States)

    Rochinha, Carlos A.; Santos, João A.; Liberato, Margarida L. R.; Pinto, Joaquim G.

    2014-05-01

    Onshore grid-connected wind power generation has been explored for more than three decades in the Iberian Peninsula. Further, increasing attention has been devoted to renewable energy sources in a climate change context. While advantages of wind energy are widely recognized, its distribution is not spatially homogeneous and not uniform throughout the year. Hence, understanding these spatial-temporal distributions is critical in power system planning. The present study aims at assessing the potential power output estimated from 10 m wind components simulated by a regional climate model (CCLM), driven by ERA40 reanalysis. Datasets are available on a grid with a high spatial resolution (approximately 20 km) and over a 40-yr period (1961-2000). Furthermore, several target sites, located in areas with high installed wind generation capacity, are selected for local-to-regional scale assessments. The results show that potential wind power is higher over northern Iberia, mostly in Cantabria and Galicia, while Andalucía and Cataluña record the lowest values. With respect to the intra-annual variability, summer is by far the season with the lowest potential energy outputs. Furthermore, the inter-annual variability reveals an overall downward long-term trend over the 40-yr period, particularly in the winter time series. A CCLM transient experiment, forced by the SRES A1B emission scenario, is also discussed for a future period (2041-2070), after a model validation/calibration process (bias corrections). Significant changes in the wind power potential are projected for the future throughout Iberia, but their magnitude largely depends on the locations. This work was partially supported by FEDER (Fundo Europeu de Desenvolvimento Regional) funds through the COMPETE (Programa Operacional Factores de Competitividade) and by national funds through FCT (Fundação para a Ciência e a Tecnologia, Portugal) under project STORMEx FCOMP-01-0124-FEDER- 019524 (PTDC/AAC-CLI/121339/2010).

  18. Deep Help in Complex Project Work: Guiding and Path-Clearing Across Difficult Terrain

    OpenAIRE

    Fisher, Colin M.; Pillemer, Julianna; Amabile, Teresa M.

    2017-01-01

    How do teams working on complex projects get the help they need? Our qualitative investigation of the help provided to project teams at a prominent design firm revealed two distinct helping processes, both characterized by deep, sustained engagement that far exceeds the brief interactions described in the helping literature. Such deep help consisted of (1) guiding a team through a difficult juncture by working with its members in several prolonged, tightly clustered sessions, or (2) path-clea...

  19. Innovation in POPBL teaching and learning methods by embedding individual activities as an integrated part of project work

    DEFF Research Database (Denmark)

    Moesby, Egon; W., Hans Henrik; Kørnøv, Lone

    2005-01-01

    activity embedded as an integrated part of the project work. Students work in the solution phase of the project on an individual activity that is separately assessed. The results of these individual activities form the platform for students’ final work with the project as a team. They have to evaluate......In this paper, the authors describe a way to increase student learning through social constructed teamwork by adding an individual activity to the project work. This can be achieved not just by adding an individual activity outside or parallel to the project work, but by having the individual...... the individual solutions and find the one solution to work on in the final phases of the project. On top of that, it helps train students’ abilities to make evaluations among various solutions of which one is their own, thereby learning how to evaluate their personal solutions against another person’s solutions...

  20. Actividades comunicativas en la clase de Inglés : project work. News about your city

    OpenAIRE

    Valero Garcés, Carmen

    1991-01-01

    In the context of language learning, projects are multiskill activities focusing on topics or themes rather than on specific language targets. Students themselves playa crucial part in the initial choice of subject matter and the decisions related to appropiate working method, the project timetable and the eventual «end product». Project work provides students with opportunities to recycle know language and skills in a relatively natural context because specific language a...

  1. The Chernobyl reactor accident, ten years on. Teaching projects for mathematics instruction in interdisciplinary working groups

    International Nuclear Information System (INIS)

    Boer, H.; Delle, E.; Mies, K.; Warmeling, A.

    1996-01-01

    The booklet presents background information and addresses the following aspects: ionizing radiation and radiation effects; safety of German nuclear power plants; statistical evidence of radiation injuries; short-lived and long-lived ionizing radiation; radioactive waste; CO 2 emissions as an argument in favour of nuclear power generation. The material presented is intended for use by a school project team interested in the subjects, or as a basis for collaborative, interdisciplinary teaching in working groups, and it offers information and problems for mathematics teaching. (HP) [de

  2. A review of planetary and space science projects presented at iCubeSat, the Interplanetary CubeSat Workshop

    Science.gov (United States)

    Johnson, Michael

    2015-04-01

    iCubeSat, the Interplanetary CubeSat Workshop, is an annual technical workshop for researchers working on an exciting new standardised platform and opportunity for planetary and space scientists. The first workshop was held in 2012 at MIT, 2013 at Cornell, 2014 at Caltech with the 2015 workshop scheduled to take place on the 26-27th May 2015 at Imperial College London. Mission concepts and flight projects presented since 2012 have included orbiters and landers targeting asteroids, the moon, Mars, Venus, Saturn and their satellites to perform science traditionally reserved for flagship missions at a fraction of their cost. Some of the first missions proposed are currently being readied for flight in Europe, taking advantage of multiple ride share launch opportunities and technology providers. A review of these and other interplanetary CubeSat projects will be presented, covering details of their science objectives, instrument capabilities, technology, team composition, budget, funding sources, and the other programattic elements required to implement this potentially revolutionary new class of mission.

  3. Poster presented at Research Bazaar 2015 - project and digital tools overview

    OpenAIRE

    Strack, Michael

    2015-01-01

    Poster presented at the Research Bazaar 2015 at Melbourne University, Australia. Conference attendees were asked to share an overview of their project and the digital platforms they used in their research.

  4. Production of NDA Working Reference Materials for the Capability Evaluation Project

    International Nuclear Information System (INIS)

    Noll, P.D. Jr.; Marshall, R.S.

    1998-01-01

    The production of Non Destructive Assay (NDA) Working Reference Materials (WRMs) that are traceable to nationally recognized standards was undertaken to support implementation of the Idaho National Engineering and Environmental Laboratory (INEEL) Nondestructive Waste Assay Capability Evaluation Project (CEP). The WRMs produced for the CEP project consist of Increased Am/Pu mass ration (IAP) and depleted Uranium (DU) WRMs. The CEP IAP/DU WRM set provides radioactive material standards for use in combination with 55 gallon drum waste matrix surrogates for the assessment of waste NDA assay system performance. The Production of WRMs is a meticulous process that is not without certain trials and tribulations. Problems may arise at any of the various stages of WRM production which include, but are not limited to; material characterization (physical, chemical, and isotopic), material blend parameters, personnel radiation exposure, gas generation phenomenon, traceability to national standards, encapsulation, statistical evaluation of the data, and others. Presented here is an overall description of the process by which the CEP WRMs were produced and certified as well as discussions pertaining to some of the problems encountered and how they were solved

  5. Working Party on International Nuclear Data Evaluation Cooperation (WPEC). Presentations and documents submitted to the 25. meeting, NEA Headquarters, 23-24 May 2013

    International Nuclear Information System (INIS)

    2013-01-01

    The NEA's nuclear data evaluation co-operation activities involve the following evaluation projects: ENDF (United States), JEFF (Data Bank member countries), JENDL (Japan) and RUSFOND/BROND (Russia). The participation from projects in non-NEA Member countries, such as CENDL, is channelled through the Nuclear Data Section of the International Atomic Energy Agency (IAEA). The working party was established to promote the exchange of information on nuclear data evaluations, measurements, nuclear model calculations, validation, and related topics, and to provide a framework for co-operative activities between the participating projects. The working party assesses nuclear data improvement needs and addresses these needs by initiating joint evaluation and/or measurement efforts. The 25. meeting of the working party was held on 23-24 May 2013 at the NEA Headquarters, Issy-les-Moulineaux, France. This document brings together the available presentations (slides and reports) given at this meeting Presentations (slides) on experimental activities are available for: NEA DB, Japan, USA, Russia and China (slides + report). Brief progress reports (slides) from the evaluation projects are available for: ENDF, JEFF, JENDL (slides + Report), BROND + slides on Rosatom Standard Reference Data System, CENDL, IAEA and TENDL. Presentations (slides) about the Status of subgroups are available for the following subgroups: - Subgroup 31: Meeting nuclear data needs for advanced reactors (slides + report); - Subgroup C: High Priority Request List (HPRL); - Subgroup 33: Methods and issues for the combined use of integral experiments and covariance data (slides + report); - Subgroup 34: Coordinated evaluation of 239 Pu in the resonance region; - Subgroup 35: Scattering angular distribution in the fast energy range; - Subgroup 36: Reporting and usage of experimental data for evaluation in the resolved resonance region; - Subgroup 37: Improved fission product yield evaluation methodologies

  6. The Web Lecture Archive Project: Archiving ATLAS Presentations and Tutorials

    CERN Multimedia

    Herr, J

    2004-01-01

    The geographical diversity of the ATLAS Collaboration presents constant challenges in the communication between and training of its members. One important example is the need for training of new collaboration members and/or current members on new developments. The Web Lecture Archive Project (WLAP), a joint project between the University of Michigan and CERN Technical Training, has addressed this challenge by recording ATLAS tutorials in the form of streamed "Web Lectures," consisting of synchronized audio, video and high-resolution slides, available on demand to anyone in the world with a Web browser. ATLAS software tutorials recorded by WLAP include ATHENA, ATLANTIS, Monte Carlo event generators, Object Oriented Analysis and Design, GEANT4, and Physics EDM and tools. All ATLAS talks, including both tutorials and meetings are available at http://www.wlap.org/browser.php?ID=atlas. Members of the University of Michigan Physics Department and Media Union, under the framework of the ATLAS Collaboratory Project ...

  7. Web Environments for Group-Based Project Work in Higher Education

    NARCIS (Netherlands)

    Andernach, J.A.; van Diepen, N.M.; Collis, Betty; Andernach, Toine

    1997-01-01

    We discuss problems confronting the use of group-based project work as an instructional strategy in higher education and describe two courses in which course-specific World Wide Web (Web) environments have evolved over a series of course sequences and are used both as tool environments for

  8. Replacement of the Project Manager Reflected Through Activity Theory and Work-System Theory

    Science.gov (United States)

    Vartiainen, Tero; Aramo-Immonen, Heli; Jussila, Jari; Pirhonen, Maritta; Liikamaa, Kirsi

    Replacement of the project manager (RPM) is a known phenomenon in information systems (IS) projects, but scant attention is given to it in the project management or IS literature. Given its critical effects on the project business, the organization, the project team, and the project manager, it should be studied in more depth. We identified factors which make RPM occurrences inherently different and we show that work-system theory and activity theory give comprehensive lenses to advance research on RPM. For the future research on RPM we identified three objectives: experiences on RPM, process model for RPM, and organizational culture's influence on RPM occurrences.

  9. Life project of adolescents, a product of socio-educational work of school

    Directory of Open Access Journals (Sweden)

    Maibel Rebollar-Ferrer

    2016-10-01

    Full Text Available The improvement of formative work, through a life orientation that is characterized by the correspondence of aspirations or individual goals, potentials and social demands is a challenge to Junior high school in the design and implementation of sócio–educative system of actions, that led by principals and teachers, integrates socializing agents, in order to prepare adolescents in managing a developmental life project to ensure their integration into dynamic and complex society. This research paper nowadays, from the pedagogical, psychological and sociological references, a conceptual basis for understanding adolescents’ life project as an expression of integral formation and the product of social and educational work of school.

  10. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S&M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S&M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the IFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of IFDP facilities was initiated in FY 1994 and will be completed in FY 1999. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $36M. The costs are summarized. Upon completion of deactivation, annual S&M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.

  11. Dust as a Working Fluid for Heat Transfer Project

    Science.gov (United States)

    Mantovani, James G.

    2015-01-01

    The project known as "Dust as a Working Fluid" demonstrates the feasibility of a dust-based system for transferring heat radiatively into space for those space applications requiring higher efficiency, lower mass, and the need to operate in extreme vacuum and thermal environments - including operating in low or zero gravity conditions in which the dust can be conveyed much more easily than on Earth.

  12. Review and Update Project Design, Work Plan and Activities for 2009 and Beyond

    International Nuclear Information System (INIS)

    Edward, M.

    2009-01-01

    A multi year ongoing project, previously approved by Board of Governors (BOG) that is implemented according to the already approved objectives/outcomes and time frame. All projects have time frame in line with the stated objectives and work plans, of maximum of five years. If rephasing is necessary due to dealys in implementation, the project duration can be extended by up to one year, maintaining the original objectives/outcomes

  13. The Radioisotopes production in tunisia, presentation of the CNSTN project

    International Nuclear Information System (INIS)

    Ounalli, Leila

    2013-01-01

    Radio-isotopes required in medicine (nuclear medicine, neurology, cardiology, orthopedics) need a deep reflection and a scientific analysis of the problems related to the human health. The utilisation of radioisotopes in other fields such as chemistry, agriculture, industry, safety, earth sciences and environmental physics is also of great importance. In pharmaceutical companies, radioisotopes used in a laboratory of imaging for small animal to check the efficiency of drugs in vivo is touched upon in this presentation. Radioisotopes are also needed for different activities in platform dedicated to the training of radio pharmacist and radio biologist. The availability of radioisotopes in a research center such as the National Center of Nuclear Sciences and Technologies (NCNST) will improve the activity of existing skills and serve the country's development in the field of biomedical research. Tunisia has two projects of cyclotrons facilities: the first one is in the private sector and the second one is proposed by the NCNST. The realization of these projects requires a period of time estimated to two years for the feasibility study and two years more for constitution. In the meantime, it is necessary to establish a master's degree in radio-pharmacy / radio-biology to provide skills that may activate cyclotron facilities. One last test phase lasts 6 months to a year. The work within a cyclotron facility requires a rigorous and a lot of discipline (a little bit military) ordered by the risk of the isotope radioactive half-life and its radiation activity. Thus, it is necessary to provide to the staff, various training required for the functioning of the cyclotron. It is useful to insist on the importance of scientist's team which is going to put on the cyclotron and which consists of: radio-pharmacists, radio physicists experts in radiation protection, and engineer's operators of cyclotrons. It is useful to attract the attention that the specialties in the field of the

  14. Senate works: law project on the energy policy (first reading)

    International Nuclear Information System (INIS)

    2004-01-01

    This synthesis of the Senate works on the law project on the energy policy, comments each article of the law text. It concerns: the energy demand control, the renewable energies, the equilibrium and the quality of the transport and distribution networks of electric power, taxation and financial incentives. (A.L.B.)

  15. Time, Place and Identity in Project Work on the Net

    DEFF Research Database (Denmark)

    Heilesen, Simon; Jensen, Sisse Siggaard

    2005-01-01

    This chapter identifies some of the fundamental conditions and factors that affect collaborative project work on the Net. Understanding them is fundamental to developing key qualities in Net-based collaborative learning such as confidence, reliability, and trust. We argue that: (1) Collaboration...... of Computer-Mediated Communication program at Roskilde University, Denmark....

  16. University Clinic of Toxicology--historical note and present work.

    Science.gov (United States)

    Bozinovska, C

    2013-01-01

    The University Clinic of Toxicology (UCT) in Skopje was founded as the Clinic for Toxicology and Emergency Internal Medicine on January 15th 1976. Today UCT has a modern building with office space of 1,300 m2 on 4 floors, 40 hospital beds and 72 employees including 18 doctors. UCT works in accordance with the public healthcare services in the Republic of Macedonia through the use of specialist/consultative and hospital healthcare for people over the age of 14 years. The Clinic also provides services in the field of emergency internal medicine, acute poisoning with medications, pesticides, corrosives, poisonous gases and mushrooms, heavy metals and other chemicals. The Clinic takes an active part in the detoxification programme for users of opiates and psychotropic substances, protocols for enteral and parenteral nutrition and guides for home treatment. Yearly there are more than 14,000 ambulance admissions, over 1,400 hospitalized patients, over 4,000 urgent EHO checks, more than 1,000 urgent upper endoscopies and over 700 other toxicological analyses and other interventions. The educational services and activities are realized through the chair for internal medicine. The Clinic offers undergraduate and graduate level education for medical students and dentists, for medical nurses, radiology technicians, speech therapists and physiotherapists. Over 300 papers and reports have been published to date by the medical staff at the UCT in the form of abstracts and integrated projects in the Republic of Macedonia and aboard. 8 doctorates have been successfully completed by employees from the Clinic as well as 4 master's theses and 1 in-depth project. UCT employees are the authors of some textbooks and monographs. UCT have undertaken some scientific projects. Employees from the Clinic of Toxicology are members taking an active part in many domestic and international associations.

  17. Accidents of Electrical and Mechanical Works for Public Sector Projects in Hong Kong.

    Science.gov (United States)

    Wong, Francis K W; Chan, Albert P C; Wong, Andy K D; Hon, Carol K H; Choi, Tracy N Y

    2018-03-10

    A study on electrical and mechanical (E&M) works-related accidents for public sector projects provided the opportunity to gain a better understanding of the causes of accidents by analyzing the circumstances of all E&M works accidents. The research aims to examine accidents of E&M works which happened in public sector projects. A total of 421 E&M works-related accidents in the "Public Works Programme Construction Site Safety and Environmental Statistics" (PCSES) system were extracted for analysis. Two-step cluster analysis was conducted to classify the E&M accidents into different groups. The results identified three E&M accidents groups: (1) electricians with over 15 years of experience were prone to 'fall of person from height'; (2) electricians with zero to five years of experience were prone to 'slip, trip or fall on same level'; (3) air-conditioning workers with zero to five years of experience were prone to multiple types of accidents. Practical measures were recommended for each specific cluster group to avoid recurrence of similar accidents. The accident analysis would be vital for industry practitioners to enhance the safety performance of public sector projects. This study contributes to filling the knowledge gap of how and why E&M accidents occur and promulgating preventive measures for E&M accidents which have been under researched.

  18. Accidents of Electrical and Mechanical Works for Public Sector Projects in Hong Kong

    Directory of Open Access Journals (Sweden)

    Francis K. W. Wong

    2018-03-01

    Full Text Available A study on electrical and mechanical (E&M works-related accidents for public sector projects provided the opportunity to gain a better understanding of the causes of accidents by analyzing the circumstances of all E&M works accidents. The research aims to examine accidents of E&M works which happened in public sector projects. A total of 421 E&M works-related accidents in the “Public Works Programme Construction Site Safety and Environmental Statistics” (PCSES system were extracted for analysis. Two-step cluster analysis was conducted to classify the E&M accidents into different groups. The results identified three E&M accidents groups: (1 electricians with over 15 years of experience were prone to ‘fall of person from height’; (2 electricians with zero to five years of experience were prone to ‘slip, trip or fall on same level’; (3 air-conditioning workers with zero to five years of experience were prone to multiple types of accidents. Practical measures were recommended for each specific cluster group to avoid recurrence of similar accidents. The accident analysis would be vital for industry practitioners to enhance the safety performance of public sector projects. This study contributes to filling the knowledge gap of how and why E&M accidents occur and promulgating preventive measures for E&M accidents which have been under researched.

  19. Accidents of Electrical and Mechanical Works for Public Sector Projects in Hong Kong

    Science.gov (United States)

    Wong, Francis K. W.; Chan, Albert P. C.; Wong, Andy K. D.; Choi, Tracy N. Y.

    2018-01-01

    A study on electrical and mechanical (E&M) works-related accidents for public sector projects provided the opportunity to gain a better understanding of the causes of accidents by analyzing the circumstances of all E&M works accidents. The research aims to examine accidents of E&M works which happened in public sector projects. A total of 421 E&M works-related accidents in the “Public Works Programme Construction Site Safety and Environmental Statistics” (PCSES) system were extracted for analysis. Two-step cluster analysis was conducted to classify the E&M accidents into different groups. The results identified three E&M accidents groups: (1) electricians with over 15 years of experience were prone to ‘fall of person from height’; (2) electricians with zero to five years of experience were prone to ‘slip, trip or fall on same level’; (3) air-conditioning workers with zero to five years of experience were prone to multiple types of accidents. Practical measures were recommended for each specific cluster group to avoid recurrence of similar accidents. The accident analysis would be vital for industry practitioners to enhance the safety performance of public sector projects. This study contributes to filling the knowledge gap of how and why E&M accidents occur and promulgating preventive measures for E&M accidents which have been under researched. PMID:29534429

  20. Problem based Learning versus Design Thinking in Team based Project work

    DEFF Research Database (Denmark)

    Denise J. Stokholm, Marianne

    2014-01-01

    project based learning issues, which has caused a need to describe and compare the two models; in specific the understandings, approaches and organization of learning in project work. The PBL model viewing the process as 3 separate project stages including; problem analysis, problem solving and project......All educations at Aalborg University has since 1974 been rooted in Problem Based Learning (PBL). In 1999 a new education in Industrial design was set up, introducing Design Based Learning (DBL). Even though the two approaches have a lot in common they also hold different understandings of core...... report, with focus on problem solving through analysis. Design Based Learning viewing the process as series of integrated design spaces including; alignment, research, mission, vision, concept, product and process report, with focus on innovative ideation though integration. There is a need of renewing...

  1. Waste Management Project fiscal year 1998 multi-year work plan, WBS 1.2

    International Nuclear Information System (INIS)

    Jacobsen, P.H.

    1997-01-01

    The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposal of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project, Liquid Effluents Project, and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible

  2. Collaborative Writing to Enhance Academic Writing Development through Project Work

    Science.gov (United States)

    Robayo Lun, Alma Milena; Hernandez Ortiz, Luz Stella

    2013-01-01

    Advanced students at university level struggle with many aspects of academic writing in English as a foreign language. The purpose of this article is to report on an investigation aimed at analyzing what collaborative writing through project work tells us about students' academic writing development at the tertiary level. The compositions written…

  3. Effect of project work on secondary school students science process ...

    African Journals Online (AJOL)

    The study investigated the effect of students' project work on secondary school science process skills acquisition in Biology. The study was carried out in Owerri North Local Government Area of Imo State. Three research questions guided the study and three null hypotheses were postulated and tested at 0.05 level of ...

  4. Working by projects: A way to enrich critical thinking and the writing process in a third grade eflclassroom

    Directory of Open Access Journals (Sweden)

    Sandra Dolores Ruiz

    2014-01-01

    Full Text Available This document presents the result of a qualitative action research developed with thirty-three third grade students at a public school in Bogota. This action research aimed at describing and analyzing the role of project work in the development of critical thinking in third grade efl students and to describe and document the way in which those students developed their writing skills through this methodology. The participants developed different inquiries related to topics they were interested in exploring and related to the recycling project of the school. The data were collected during eleven sessions carried out along eight months through field notes, artifacts, and audio recordings. The results show that through project work the students enhanced their emerging critical thinking skills and their writing process; improved their interactions with their classmates, discovered that learning English was something useful for their lives, and therefore they acquired more confidence in writing and speaking in English. Additionally, they became more reflective, organized and critical about what they think, what they say, and about what happens around them.

  5. CEC project Mirage - second phase on migration of radionuclides in the geosphere. Third (and final) summary progress report (work period 1989)

    International Nuclear Information System (INIS)

    Come, B.

    1990-01-01

    A second phase of the Community coordinated project Mirage (migration of radionuclides in the geosphere) was launched in 1986. The present report brings together reviews of work done in the four research areas of this phase for 1989, and therefore constitutes an update of the previous reports, ref. EUR 11589 and 12229. This project is part of the CEC R and D programme on radioactive waste management (1985-89)

  6. Developing Employment Interview and Interviewing Skills in Small-group Project Work.

    Science.gov (United States)

    Hindle, Paul

    2000-01-01

    Discusses the value of communications skills in geographical education. Describes the use of realistic interviews that were a part of small-group project work. Explains that students wrote job specifications, a curriculum vitae, a cover letter, and conducted interview panels. (CMK)

  7. Estimation of the Net Present Value of the Investment Project in the Situation of Fuzzy Initial Data

    Directory of Open Access Journals (Sweden)

    Kotsyuba Oleksiy S.

    2017-03-01

    Full Text Available The article investigates the problem of estimating the net present value of the investment project using a methodology based on the theory of fuzzy sets in the situation when the initial data are described by fuzzy estimates. In the general case the fuzzy-multiple estimation of the specified indicator at a discrete-interval representation of the initial parameters is reduced to a set of homogeneous optimization problems. Often, depending on the characteristics of fuzzy estimates of cash flows of the investment project under consideration, the solutions to these problems can be found directly on the basis of relevant analytical expressions, while other problems require using special optimization methods. In the work there made an attempt to develop the analytical component of the fuzzy-multiple modeling of the net present value indicator. First, we examined the general search and optimization approach, which allows providing a predetermined degree of accuracy, as well as the method for approximate determination of the fuzzy estimate of the net present value on the basis of analytical relationships developed by Сhui-Yu Chiu and Chan S. Park. After that, the situation was analyzed, and the corresponding calculation model was proposed, when fuzzy estimates of the cash flows of the investment project can be interpreted from the perspective of the concept of the money-generating operation formulated by O. B. Lozhkin. Among other things, it allowed to develop a general scheme for determining the fuzzy estimate of the net present value, supplementing it with the situation of this concept. As the main direction of the further development of the problems discussed in the publication there determined the formation of a holistic methodology for evaluating the effectiveness of real investments, which would cover different in their nature and structural characteristics types of uncertainty from unified theoretical positions.

  8. Report about drilling works made in 13 Anomaly de Taylor and in the N- NE of its, around Fraile Muerto (Cerro Largo district): Uranium project

    International Nuclear Information System (INIS)

    Massa, J; Pirelli, H.

    1983-01-01

    The perforations were carried out to investigate in depth denominated anomaly 13 detected during the Taylor Mission (1975) and extended the punch area of study during you are suitable DINAMIGE-BRGM (Project the present report details the activities realised in the environs Fraile Muerto (Cerro Largo district) by the command team of perforations of the uranium project. Previously and contemporarily to the executed works, prospection became geophysical ground geochemistry geology and, works. (Uranium)

  9. Learning to make technology work - a study of learning in technology demonstration projects

    DEFF Research Database (Denmark)

    Sutherland Olsen, Dorothy; Andersen, Per Dannemand

    2014-01-01

    Building working demonstrations of new technologies within sustainable energy and transport has become an important activity in the move towards a more energy efficient society. The work involved in building these demonstrations is usually organised in a project with a variety of different partic...

  10. Causes of delays on Construction Projects in Kuwait according to opinion of engineers working in Kuwait

    OpenAIRE

    Naser S. Almutairi

    2016-01-01

    This paper presents an investigation into analysis of the causes of delays on Construction Projects in Kuwait according to opinion of engineers working in Kuwait. This is achieved through identification of the major causes of delays in the construction industry as reported in literature and using a questionnaire survey to collect the views of the various key players in the Kuwaiti construction industry. The data is analyzed and the views of the groups surveyed discussed and the relative impor...

  11. Clinical presentation of (subclinical) jaundice - The Euricterus project in The Netherlands

    NARCIS (Netherlands)

    Reisman, Y; Gips, CH; Lavelle, SM; Wilson, JHP

    1996-01-01

    Background: From a primary clinical database, rue wanted to obtain insight in disease distribution and clinical presentation of adult jaundiced patients in a Western country. Materials and Methods: As part of the Euricterus project, 24 Dutch general and academic hospitals in a period of 2 years

  12. Reducing Cancer Health Disparities through Community Engagement: Working with Faith-Based Organizations (Project CHURCH) | Division of Cancer Prevention

    Science.gov (United States)

    Speaker | "Reducing Cancer Health Disparities through Community Engagement: Working with Faith-Based Organizations (Project CHURCH)" will be presented by Lorna H. McNeill, PhD, MPH, Chair of the Department of Health Disparities at the University of Texas MD Anderson Cancer Center in Houston, TX. Date: 2/20/2018; Time: 11:00am - 12:00pm; Location: NCI Shady Grove Campus,

  13. Working hours: Past, present, and future

    OpenAIRE

    Dolton, Peter

    2017-01-01

    Working hours across the world are falling, but considerable variation remains. In some countries people work 70% more hours per year, on average, than in other countries. Much of this variation is due to differences in the prevalence of part-time work and patterns of female labor market participation. Looking ahead, the question of how reducing working hours will affect productivity is significant. In addition, how individuals divide up their leisure and work time and what the appropriate wo...

  14. Microbial transformation of coal and coal relevant structures - presentation of a BMBF joint research project

    Energy Technology Data Exchange (ETDEWEB)

    Sinder, C.; Schacht, S.; Pfeifer, F.; Klein, J. [DMT-Gesellschaft fuer Forschung und Pruefung mbH, Essen (Germany)

    1997-12-31

    Investigations in the joint research project `Microbial transformation of coal and coal relevant structures` supported by the Ministry of Education, Science, Research and Technology (BMBF) of the Federal Republic of Germany and coordinated by the DMT-Gesellschaft fuer Forschung und Pruefung mbH (DMT) are focussed on research and development of biotechnological coal conversion processes. Up to now investigations carried out in the project lead to a number of important results. During work on the project a great number of different microorganisms was found able to degrade or solubilize coal or lignite. Enzymatic as well as regulation mechanisms of the microbial depolymerization processes have been characterized successfully. (orig.)

  15. Full-text publication of abstract-presented work in sport and exercise psychology.

    Science.gov (United States)

    Shue, Sarah; Warden, Stuart

    2018-01-01

    Meetings promote information sharing, but do not enable full dissemination of details. A systematic search was conducted for abstracts presented at the 2010 and 2011 Association of Applied Sport Psychology Annual Conferences to determine the full-text dissemination rate of work presented in abstract form and investigate factors influencing this rate. Systematic searches were sequentially conducted to determine whether the abstract-presented work had been published in full-text format in the 5 years following presentation. If a potential full-text publication was identified, information from the conference abstract (eg, results, number of participants in the sample(s), measurement tools used and so on) was compared with the full text to ensure the two entities represented the same body of work. Abstract factors of interest were assessed using logistic regression. Ninety-four out of 423 presented abstracts (22.2%) were published in full text. Odds of full-text publication increased if the abstract was from an international institution, presented in certain conference sections or presented as a lecture. Those attending professional conferences should be cautious when translating data presented at conferences into their applied work because of the low rate of peer-reviewed and full-text publication of the information.

  16. The Pedagogic Project as Provocative of the Collective Work in the School

    Directory of Open Access Journals (Sweden)

    Elaine Sampaio Araujo

    2007-06-01

    Full Text Available The objective of this article is to discuss, starting from the historical-cultural perspective, the sense of a pedagogic project considering its procedural nature, the convergence of the personal and collective dimensions and the educational purpose. The goal is to notice the project as possibility in the field pragmatic and in the theory of the sciences of human formation, linking the human development with the schools and its projects. For that, it tries to demonstrate that pedagogic projects configured as activity don't just legitimate the collective participation as it establish a new theoretical and/or methodological order in the organization of the pedagogic work, provoking a school that learns and grows in the search of forming men and women of the best human quality.

  17. Women of the Manhattan Project

    Science.gov (United States)

    Marshall, Jill

    2009-10-01

    In the book Their Day in the Sun, Ruth Howes and Caroline Herzenberg documented more than 1000 women who worked on the Manhattan Project, preserving their legacy for generations to come. At the 2009 Chicago meeting, the AAPT Committee on Women in Physics celebrated the accomplishments of these women and the men who worked beside them. Howes presented an overview of the contributions of women to the development of the first nuclear weapon, and the session was honored with talks from two Manhattan project veterans, Ellen Cleminshaw Weaver, who worked at Oak Ridge, and Dorothy Marcus Gans, who worked as a technician in the Metallurgical Laboratory in Chicago. I will present a summary of the session, analyzing the effect of working on the project on the career trajectories of the women involved, and point listeners toward additional documentation of this history.

  18. A GUIDE TO RECOMMENDATIONS FOR WORKING WITH VIRTUAL TEAMS ON PROJECTS GUIDED BY PMI

    Directory of Open Access Journals (Sweden)

    Maíra Paschoalino Fernandes Bahia

    2017-12-01

    Full Text Available Due the demand of markets to be more competitive in search of immediate results, reach high quality and low cost, the companies are seeking alternatives to have more quality, minimize the cost and speed up the time in a project. One example is work with a model of teams called virtual teams. In order to identify bottlenecks and difficulties encountered in this team model to minimize the risk of failures in a project, this study applied a survey to professionals of various nationalities with experience working with virtual teams based in projects guided by PMI good practices. At the end of this study was possible to quantify and relate the main problems listed by these professionals, which prevented them from completing the projects on time, cost and quality desired. Thus for each of the points mentioned it was suggested some recommendations for the application of tools and techniques most suitable in this context.

  19. Overview of the ACEX project iodine work

    Energy Technology Data Exchange (ETDEWEB)

    Merilo, M

    1996-12-01

    The ACEX project is an internationally sponsored research program that focuses on several aspects of severe accidents. The areas addressed are iodine behavior in containments, pool scrubbing, molten corium concrete interactions, and ex-vessel core debris coolability. These areas all represent extensions to the previous and current ACE and MACE programs respectively. The ACE-Phase B (iodine) project, and other recent research efforts, have clarified the roles of the important phenomena that influence iodine volatility in reactor containments during severe accidents. The ACE Iodine Chemistry Subcommittee concluded that even though enough data has been generated to support reasonably good quantification of the important phenomena, a few important areas remain where quantification is still uncertain. This is due to a lack of agreement on how to utilize the existing database, as well as the possible absence of critical test and/or property data. Technical resolution of the overall iodine behavior issue is therefore not feasible until these uncertainties are fully assessed and practical solutions have been identified, implemented, and verified. The overall objectives of the ACEX iodine research program are to ensure that the iodine database can be used to predict the airborne concentration of iodine, the conditions for iodine reservoir stability, and to provide a mechanistic understanding for these phenomena. The first phase of this work involves a comprehensive review and interpretation of the existing database in order to formulate practical strategies for dealing with significant uncertainties and/or deficiencies. Several projects are underway involving the effects of organic reactions and structural surface interactions. In addition effort is being expended on standardizing the aqueous iodine kinetics database, specifying useful mass transfer models, and defining methodology for pH prediction. (Abstract Truncated)

  20. Status report of the nuclear data project at McMaster University. December 1998 - present

    International Nuclear Information System (INIS)

    Singh, B.

    2001-01-01

    This report covers the state of the art of the nuclear data project, covering the chains in ENSDF data of permanent interest and the data published and submitted since 1998. The new activities, compilation data and work in progress are described, and data related publications are cited

  1. Statement of work for the immobilized high-level waste transportation system, Project W-464

    Energy Technology Data Exchange (ETDEWEB)

    Mouette, P.

    1998-06-24

    The objective of this Statement of Work (SOW) is to present the scope, the deliverables, the organization, the technical and schedule expectations for the development of a Package Design Criteria (PDC), cost and schedule estimate for the acquisition of a transportation system for the Immobilized High-Level Waste (IHLW). This transportation system which includes the truck, the trailer, and a shielded cask will be used for on-site transportation of the IHLW canisters from the private vendor vitrification facility to the Hanford Site interim storage facility, i.e., vaults 2 and 3 of the Canister Storage Building (CSB). This Statement of Work asks Waste Management Federal Services, Inc., Northwest Operations, to provide Project W-464 with a Design Criteria Document, plus a life-cycle schedule and cost estimate for the acquisition of a transportation system (shielded cask, truck, trailer) for IHLW on-site transportation.

  2. Salt Repository Project: FY 85 technical project plan

    International Nuclear Information System (INIS)

    1985-07-01

    The FY 85 technical plan for the Salt Repository Project is briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management Program are discussed, and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 work breakdown structure tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Exploratory Shaft, Test Facilities, Land Acquisition, and Project Management) in the various sections. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. A strategy diagram and a master schedule are included and each of the milestones is also listed chronologically in the sections

  3. The WorkQueue project - a task queue for the CMS workload management system

    Science.gov (United States)

    Ryu, S.; Wakefield, S.

    2012-12-01

    We present the development and first experience of a new component (termed WorkQueue) in the CMS workload management system. This component provides a link between a global request system (Request Manager) and agents (WMAgents) which process requests at compute and storage resources (known as sites). These requests typically consist of creation or processing of a data sample (possibly terabytes in size). Unlike the standard concept of a task queue, the WorkQueue does not contain fully resolved work units (known typically as jobs in HEP). This would require the WorkQueue to run computationally heavy algorithms that are better suited to run in the WMAgents. Instead the request specifies an algorithm that the WorkQueue uses to split the request into reasonable size chunks (known as elements). An advantage of performing lazy evaluation of an element is that expanding datasets can be accommodated by having job details resolved as late as possible. The WorkQueue architecture consists of a global WorkQueue which obtains requests from the request system, expands them and forms an element ordering based on the request priority. Each WMAgent contains a local WorkQueue which buffers work close to the agent, this overcomes temporary unavailability of the global WorkQueue and reduces latency for an agent to begin processing. Elements are pulled from the global WorkQueue to the local WorkQueue and into the WMAgent based on the estimate of the amount of work within the element and the resources available to the agent. WorkQueue is based on CouchDB, a document oriented NoSQL database. The WorkQueue uses the features of CouchDB (map/reduce views and bi-directional replication between distributed instances) to provide a scalable distributed system for managing large queues of work. The project described here represents an improvement over the old approach to workload management in CMS which involved individual operators feeding requests into agents. This new approach allows for a

  4. The WorkQueue project - a task queue for the CMS workload management system

    International Nuclear Information System (INIS)

    Ryu, S; Wakefield, S

    2012-01-01

    We present the development and first experience of a new component (termed WorkQueue) in the CMS workload management system. This component provides a link between a global request system (Request Manager) and agents (WMAgents) which process requests at compute and storage resources (known as sites). These requests typically consist of creation or processing of a data sample (possibly terabytes in size). Unlike the standard concept of a task queue, the WorkQueue does not contain fully resolved work units (known typically as jobs in HEP). This would require the WorkQueue to run computationally heavy algorithms that are better suited to run in the WMAgents. Instead the request specifies an algorithm that the WorkQueue uses to split the request into reasonable size chunks (known as elements). An advantage of performing lazy evaluation of an element is that expanding datasets can be accommodated by having job details resolved as late as possible. The WorkQueue architecture consists of a global WorkQueue which obtains requests from the request system, expands them and forms an element ordering based on the request priority. Each WMAgent contains a local WorkQueue which buffers work close to the agent, this overcomes temporary unavailability of the global WorkQueue and reduces latency for an agent to begin processing. Elements are pulled from the global WorkQueue to the local WorkQueue and into the WMAgent based on the estimate of the amount of work within the element and the resources available to the agent. WorkQueue is based on CouchDB, a document oriented NoSQL database. The WorkQueue uses the features of CouchDB (map/reduce views and bi-directional replication between distributed instances) to provide a scalable distributed system for managing large queues of work. The project described here represents an improvement over the old approach to workload management in CMS which involved individual operators feeding requests into agents. This new approach allows for a

  5. The WorkQueue project: A task queue for the CMS workload management system

    Energy Technology Data Exchange (ETDEWEB)

    Ryu, S. [Fermilab; Wakefield, Stuart [Imperial Coll., London

    2012-01-01

    We present the development and first experience of a new component (termed WorkQueue) in the CMS workload management system. This component provides a link between a global request system (Request Manager) and agents (WMAgents) which process requests at compute and storage resources (known as sites). These requests typically consist of creation or processing of a data sample (possibly terabytes in size). Unlike the standard concept of a task queue, the WorkQueue does not contain fully resolved work units (known typically as jobs in HEP). This would require the WorkQueue to run computationally heavy algorithms that are better suited to run in the WMAgents. Instead the request specifies an algorithm that the WorkQueue uses to split the request into reasonable size chunks (known as elements). An advantage of performing lazy evaluation of an element is that expanding datasets can be accommodated by having job details resolved as late as possible. The WorkQueue architecture consists of a global WorkQueue which obtains requests from the request system, expands them and forms an element ordering based on the request priority. Each WMAgent contains a local WorkQueue which buffers work close to the agent, this overcomes temporary unavailability of the global WorkQueue and reduces latency for an agent to begin processing. Elements are pulled from the global WorkQueue to the local WorkQueue and into the WMAgent based on the estimate of the amount of work within the element and the resources available to the agent. WorkQueue is based on CouchDB, a document oriented NoSQL database. The WorkQueue uses the features of CouchDB (map/reduce views and bi-directional replication between distributed instances) to provide a scalable distributed system for managing large queues of work. The project described here represents an improvement over the old approach to workload management in CMS which involved individual operators feeding requests into agents. This new approach allows for a

  6. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  7. Therese: presentation of the project

    Energy Technology Data Exchange (ETDEWEB)

    Pendibidu, J M

    1982-05-01

    Therese (Terabit Reseau) is a project built around a powerful local network with high transmission speed. A lot of goodies have been incorporated to the product in order that it can be used as a general multi-purpose tool in such areas as software engineering, artificial intelligence, robotics, office automation, VLSI design, fundamental mechanics, theoretical physics, applied mathematics, computer assisted education, high speed satellite communications, performance evaluation, general system theory, reliability, high resolution graphics, public messages, private messages, fast Fourier transform, personal computing, image processing, etc. 11 references.

  8. Effects of Individual Differences in Working Memory on Plan Presentational Choices.

    Science.gov (United States)

    Tintarev, Nava; Masthoff, Judith

    2016-01-01

    This paper addresses research questions that are central to the area of visualization interfaces for decision support: (RQ1) whether individual user differences in working memory should be considered when choosing how to present visualizations; (RQ2) how to present the visualization to support effective decision making and processing; and (RQ3) how to evaluate the effectiveness of presentational choices. These questions are addressed in the context of presenting plans, or sequences of actions, to users. The experiments are conducted in several domains, and the findings are relevant to applications such as semi-autonomous systems in logistics. That is, scenarios that require the attention of humans who are likely to be interrupted, and require good performance but are not time critical. Following a literature review of different types of individual differences in users that have been found to affect the effectiveness of presentational choices, we consider specifically the influence of individuals' working memory (RQ1). The review also considers metrics used to evaluate presentational choices, and types of presentational choices considered. As for presentational choices (RQ2), we consider a number of variants including interactivity, aggregation, layout, and emphasis. Finally, to evaluate the effectiveness of plan presentational choices (RQ3) we adopt a layered-evaluation approach and measure performance in a dual task paradigm, involving both task interleaving and evaluation of situational awareness. This novel methodology for evaluating visualizations is employed in a series of experiments investigating presentational choices for a plan. A key finding is that emphasizing steps (by highlighting borders) can improve effectiveness on a primary task, but only when controlling for individual variation in working memory.

  9. Effects of Individual Differences in Working Memory on Plan Presentational Choices

    Directory of Open Access Journals (Sweden)

    Nava Tintarev

    2016-11-01

    Full Text Available This paper addresses research questions that are central to the area of visualization interfaces for decision support: RQ1 whether individual user differences in working memory should be considered when making choosing how to present visualizations; RQ2 how to present the visualization to support effective decision making and processing; and RQ3 how to evaluate the effectiveness of presentational choices. These questions are addressed in the context of presenting plans, or sequences of actions, to users. The experiments are conducted in several domains, and the findings are relevant to applications such as semi-autonomous systems in logistics. That is, scenarios that require the attention of humans who are likely to be interrupted, and require good performance but are not time critical. Following a literature review of different types of individual differences in users that have been found to affect the effectiveness of presentational choices, we consider specifically the influence of individuals' working memory (RQ1. The review also considers metrics used to evaluate presentational choices, and types of presentational choices considered. As for presentational choices (RQ2, we consider a number of variants including interactivity, aggregation, layout, and emphasis. Finally, to evaluate the effectiveness of plan presentational choices (RQ3 we adopt a layered-evaluation approach and measure performance in a dual task paradigm, involving both task interleaving and evaluation of situational awareness. This novel methodology for evaluating visualizations is employed in a series of experiments investigating presentational choices for a plan. A key finding is that emphasizing steps (by highlighting borders can improve effectiveness on a primary task, but only when controlling for individual variation in working memory.

  10. Decommissioning the Belgonucleaire Dessel MOX plant: presentation of the project and situation end august 2013

    Energy Technology Data Exchange (ETDEWEB)

    Cuchet, J.M. [TRACTEBEL ENGINEERING, Avenue Ariane, 7, B1200 Brussels (Belgium); Libon, H.; Verheyen, C. [BELGONUCLEAIRE S.A. / N.V. Europalaan, 20, B2480 Dessel (Belgium); Bily, J. [STUDSVIK GmbH, Karlsruher Strasse, 20, D75179 Pforzheim,(Germany); Boden, S. [SCK-CEN, Boeretang, 200, B2400 Mol (Belgium); Joffroy, F. [TECNUBEL N.V., Zandbergen, 1, B2480 Dessel (Belgium); Walthery, R. [BELGOPROCESS, Gravenstraat, 73, B2480 Dessel (Belgium)

    2013-07-01

    Belgonucleaire has been operating the Dessel MOX plant at an industrial scale between 1986 and 2006. During this period, 40 metric tons of plutonium (HM) have been processed into 90 reloads of MOX fuel for commercial light water reactors. The decision to stop the production in 2006 and to decommission the MOX plant was the result of the shrinkage of the MOX fuel market due to political and commercial factors. As a significant part of the decommissioning project of the Dessel MOX plant, about 170 medium-sized glove-boxes and about 1.200 metric tons of structure and equipment outside the glove-boxes are planned for dismantling. The license for the dismantling of the MOX plant was granted by Royal Decree in 2008 and the dismantling started in March 2009. The dismantling works are carried out by an integrated organization under leadership and responsibility of Belgonucleaire; this organization includes 3 main contractors, namely Tecnubel N.V., the THV ('Tijdelijke HandelsVereniging') Belgoprocess / SCK-CEN and Studsvik GmbH and Tractebel Engineering as project manager. In this paper, after having described the main characteristics of the project, the authors review the different organizational and technical options considered for the decommissioning of the glove-boxes; thereafter the main decision criteria (qualification of personnel and of processes, confinement, cutting techniques and radiation protection, safety aspects, alpha-bearing waste management) are analyzed as well. Finally the progress, the feedback and the lessons learned at the end of August 2013 are presented, giving the principal's and contractors point of view. (authors)

  11. Work activities within sustainable development

    Directory of Open Access Journals (Sweden)

    Francisco Duarte

    2015-06-01

    Full Text Available This paper presents the main results of a Franco-Brazilian Research project entitled "Work, Innovation and Development". The aim is to conceptually consider work activity within sustainable development, and to contribute methodologically towards developing strategies for designing sustainable work systems. After a brief description of the factors and the dimensions that have contributed to the creation of ideas on sustainable development, we will put forward two main approaches for understanding work activity within the context of sustainability, these being: the durability of work activity and the development of work activities for sustainable development. Both approaches are presented and examples are given. This is followed by a discussion of the design of sustainable work systems that focuses particularly on the political and technical dimensions of project management.

  12. Spent nuclear fuel project multi-year work plan WBS number 1.4.1

    International Nuclear Information System (INIS)

    Wells, J.L.

    1997-01-01

    The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency

  13. Report of investigation into allegations of retaliation for raising safety and quality of work issues regarding Argonne National Laboratory's Integral Fast Reactor project

    International Nuclear Information System (INIS)

    1991-12-01

    In August 1990 James A. Smith resigned his position as an experimenter at Argonne National Laboratory-West (ANL-W), located near Idaho Falls, Idaho. Smith who holds a Ph.D. in metallurgy, had worked at the Laboratory since 1988, primarily on its Integral Fast Reactor (IFR) project. He alleged that the quality of the Laboratory's work on that project had been undermined by fundamental errors in metallurgy and related sciences, at least some of which had nuclear safety implications; that the Laboratory had published false and misleading accounts of its work; that prevailing attitudes at the Laboratory were antithetical to quality scientific work; and that because he had expressed concerns about these matters his job was threatened by his managers. Evidence gathered during an investigation by the Department of Energy's Office of Nuclear Safety (NS) is presented and conclusions and recommendations are provided

  14. Nevada Nuclear Waste Storage Investigations. FY 1979 project plan

    International Nuclear Information System (INIS)

    1979-03-01

    This document presents the management and cost for the Nevada Nuclear Waste Storage Investigations (disposal of high-level wastes at Nevada Test Site) and provides a complete description of the overall project, management structure, technical approach, and work breakdown structure. The document is organized into five major sections. Section I summarizes the history of the project and indicates a potential future course of action. FY 1979 project work is briefly described in Section II. Section III outlines the delegated responsibilities of all project management functions. A list of critical questions that guide the technical approach of the project are presented in Section IV. Section V contains subtask work plans which outline the work in detail for this fiscal year

  15. What a Joint. Youth Training Scheme. Core Exemplar Work Based Project.

    Science.gov (United States)

    Further Education Staff Coll., Blagdon (England).

    This trainer's guide is intended to assist supervisors of work-based career training projects in helping students become familiar with meat processing--livestock at the stockyards, meat packers (wholesalers), and butcher shops--to the cooked state and to become familiar with the different joints (cuts or parts) of beef, lamb, and pork. The guide…

  16. HFCs contribution to the greenhouse effect. Present and projected estimations

    Energy Technology Data Exchange (ETDEWEB)

    Libre, J.M.; Elf-Atochem, S.A. [Central Research & Development, Paris (France)

    1997-12-31

    This paper reviews data that can be used to calculate hydrofluorocarbon (HFC) contribution to the greenhouse effect and compare it to other trace gas contributions. Projections are made for 2010 and 2100 on the basis of available emission scenarios. Industrial judgement on the likelihood of those scenarios is also developed. Calculations can be made in two different ways: from Global Warming Potential weighted emissions of species or by direct calculation of radiative forcing based on measured and projected atmospheric concentrations of compounds. Results show that HFCs corresponding to commercial uses have a negligible contribution to the greenhouse effect in comparison with other trace gases. The projected contributions are also very small even if very high emission scenarios are maintained for decades. In 2010 this contribution remains below 1%. Longer term emissions projections are difficult. However, based on the IPCC scenario IS92a, in spite of huge emissions projected for the year 2100, the HFC contribution remains below 3%. Actually many factors indicate that the real UFC contribution to the greenhouse effect will be even smaller than presented here. Low emissive systems and small charges will likely improve sharply in the future and have drastically improved in the recent past. HFC technology implementation is likely to grow in the future, reach a maximum before the middle of the next century; the market will stabilise driven by recycling, closing of systems and competitive technologies. This hypothesis is supported by previous analysis of the demand for HTCs type applications which can be represented by {open_quotes}S{close_quotes} type curves and by recent analysis indicating that the level of substitution of old products by HFCs is growing slowly. On the basis of those data and best industrial judgement, the contribution of HFCs to the greenhouse effect is highly likely to remain below 1% during the next century. 11 refs., 2 figs., 5 tabs.

  17. Win-Win-Win: Reflections from a Work-Integrated Learning Project in a Non-Profit Organization

    Directory of Open Access Journals (Sweden)

    Dale C MacKrell

    2016-05-01

    Full Text Available This paper reports on the educational aspects of an information systems work-integrated learning (WIL capstone project for an organization which operates to alleviate homelessness in the Australian non-profit sector. The methodology adopted for the study is Action Design Research (ADR which draws on action research and design research as a means for framing a project's progress. Reflective insights by the project stakeholders, namely, students, academics, and the non-profit client, reveal a curriculum at work through internal features of the organization; personal features of the participants and features of the external environment. Preliminary findings suggest that students in a WIL project for a non-profit are highly engaged, especially when they become aware of the project’s social value. As well, the improvement of professional skills and emotional intelligence by students is more likely in real-life practice settings than in other less authentic WIL activities, equipping graduates for the workforce with both strong disciplinary and generic skills. Win-win-win synergies through project collaboration represent worthwhile outcomes to education, industry and research.

  18. A Clinical Case Presentation: Understanding and Interpreting Dreams while Working Through Developmental Trauma.

    Science.gov (United States)

    Levy, Joshua; Finnegan, Paul

    2016-02-01

    The purpose of this paper is to demonstrate the unique place of understanding and interpreting dreams in the psychoanalytic process while working through developmental trauma. This psychoanalytic process extended over six years and is presented in four phases: establishing the therapeutic alliance, a crisis, working through, and termination. Dreams from each of these four phases of the analysis are presented, and the collaborative work of understanding and interpreting these dreams is highlighted. Evidence is presented that from this analytic work there ensued an amelioration of the impact of developmental trauma and a furtherance of the development of internal psychic structure. © 2016 by the American Psychoanalytic Association.

  19. Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach

    NARCIS (Netherlands)

    Miao, Yongwu; Sloep, Peter; Koper, Rob

    2009-01-01

    Miao, Y., Sloep, P. B., & Koper, R. (2010). Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach. In D. Griffiths & R. Koper (Eds.), Rethinking Learning and Employment at a Time of Economic Uncertainty. Proceedings of the 6th TENCompetence Open

  20. Presentation of the G-24 technical working group on training

    International Nuclear Information System (INIS)

    Haber, S.

    1993-01-01

    The Technical Working Group on Training (TWG-T) was created during the Plenary Session of September 1992 in order to inform the Members on ongoing activities in the Nuclear Training field, define redundancies and gaps of the ''Assistance Programs'', and propose efficient ways to progress. Training was recognized as one major activity through which operational safety can be very effectively and quite quickly improved and therefore the Plenary Session unanimously decided to launch a TWG on the subject. The present report is issued one year after the creation of the TWG. It summarizes the major steps of the activities and presents the relevant results. It also contains copies of documents on training infrastructures and requirements, provided by the recipient countries during the course of the work

  1. Chernobyl Studies Project. Working Group 7.0, environmental transport and health effects

    International Nuclear Information System (INIS)

    Hendrickson, S.M.

    1994-01-01

    The focus of the Chernobyl Studies Project has now turned to the issue of health effects from the Chernobyl accident. Currently, we are involved in and making progress on the case-control and co-hort studies of thyroid diseases among Belarussian children. Dosimetric aspects are a fundamental part of these studies. We are working to implement similar studies in Ukraine. A major part of the effort of these projects is supporting these studies, both by providing methods and applications of dose reconstruction and by providing support and equipment for the medical teams

  2. Participatory ergonomics in industrial engineering projects: The case of a new cheese packaging line work system

    DEFF Research Database (Denmark)

    Souza da Conceição, Carolina; Broberg, Ole; Aldrich, Per

    2014-01-01

    The aim of this study is to explore and conceptualize the challenges that ergonomists meet when seeking to introduce PE methods into an industrial engineering design project in order to optimize the new work system.......The aim of this study is to explore and conceptualize the challenges that ergonomists meet when seeking to introduce PE methods into an industrial engineering design project in order to optimize the new work system....

  3. Does assessing project work enhance the validity of qualifications? The case of GCSE coursework

    Directory of Open Access Journals (Sweden)

    Victoria Crisp

    2009-03-01

    Full Text Available This paper begins by describing current views on validity and how certain assessment forms, such as school-based project work, may enhance validity. It then touches on debates about the dependability of assessment by teachers. GCSEs and GCSE coursework are then described along with the reasons for the inclusion of coursework in many GCSEs. Crooks, Kane and Cohen’s (1996 chain model of eight linked stages of validity enquiry is then used as a structure within which to consider the validity of project work assessments, and specifically GCSE coursework assessment, drawing on the available literature. Strengths for validity include the ability to assess objectives that are difficult to test in written examinations, promoting additional skills such as critical thinking, creativity and independent thinking, and improving motivation. Possible threats to validity include the potential for internet and other types of plagiarism, tasks becoming overly structured and formulaic thus reducing the positive impact on learning, and the potentially heavy workload for teachers and students. The paper concludes by describing current policy changes in the UK with regard to GCSE coursework and relates this to strong and weak validity links for project work as a mode of assessment.

  4. The projects of skunk works 75 years of Lockheed Martin's advanced development programs

    CERN Document Server

    Pace, Steve

    2016-01-01

    The Projects of Skunk Works examines 75 years of Lockheed Martin's advanced development programs, from jet fighters to missiles, heavy-lift helicopters, a lighter-than-air ship, drones, and a stealth boat.

  5. Estimating railway infrastructure project cost from transferring nominal price to real price by considering the working time possessions

    DEFF Research Database (Denmark)

    Li, Rui; Landex, Alex; Salling, Kim Bang

    are varying depending on the working time possessions presented through the closure of the railway line. The effective working hours, type of construction work and construction speed are used as constraints to ensure the track closure plan remains feasible. To demonstrate the approach a Danish railway...... and 2) railway construction work costs are not transparent in the market. This paper suggests separating the costs into 3 sub-categories: materials, labour and machinery. Evidently, the materials are further broke-down into subcomponents which then remains fixed whereas the cost of labour and machinery...... construction project, the new line to the fixed link across Fehmarn Belt, is introduced where it is shown that the non-material cost is about 19% of the total expenditure. By assuming three sets of track blocking scenarios with the same amount of construction works it is proven that given an optimal track...

  6. Using historical crash data as part of traffic work zone safety planning and project management strategies.

    Science.gov (United States)

    2014-07-01

    This funding enabled the project entitled, USING HISTORICAL CRASH DATA AS PART OF TRAFFIC WORK ZONE SAFETY : PLANNING AND PROJECT MANAGEMENT STRATEGIES to address the following: : Evaluate current organizational strategies with respect to w...

  7. Projects for increasing job satisfaction and creating a healthy work environment.

    Science.gov (United States)

    Brunges, Michele; Foley-Brinza, Christine

    2014-12-01

    Workplace culture is one of the biggest factors driving employee commitment and engagement. Multiple studies have shown that hospitals will perform better over time if employees are committed to their jobs and engaged in what they do. By creating and implementing multiple projects during a three-year period, a team at the University of Florida Health Shands Hospital, Gainesville, increased job satisfaction. Projects included ensuring meal breaks were offered, creating a serenity area, developing the patient ambassador role, actively addressing bullying and unprofessional behavior, assigning a student mentee to work with staff members on culture change, offering regular fun activities, redesigning the unit, reorganizing schedules to reduce stress, implementing education and training initiatives, establishing a Unit Practice Council, and implementing reward and recognition programs. Survey results and anecdotal evidence suggest that these projects combined to increase employee satisfaction and employee retention rates. Copyright © 2014 AORN, Inc. Published by Elsevier Inc. All rights reserved.

  8. Present status and future project on hadron physics with KEK proton synchrotron

    International Nuclear Information System (INIS)

    Masaike, Akira

    1984-01-01

    Recent experimental results on hadron physics using a 12 GeV proton synchrotron at KEK are presented. Several future projects which have been proposed as a post-shutdown program from 1985 including hypernuclear physics, physics with polarized beam and heavy ion beam are also reported. (author)

  9. The ANGSTREM project: present status and development activities

    International Nuclear Information System (INIS)

    Stepanov, V.S.; Legyuenko, S.K.; Grigoriev, O.G.; Gromov, B.F.; Dedul, A.V.; Leonchyk, M.P.; Pashkin, Yu.G.; Pankratov, D.V.; Chekunov, V.V.; Skorikov, D.E.

    1998-01-01

    The project ANGSTREM of a modular-transportable nuclear power-and-heating station with assured safety for remote areas is described. The station is based on fast nuclear reactor cooling by a lead-bismuth eutectic. The possible evolution of the project is mentioned in relation to possible new application - sea water desalination or refrigeration plants. (author)

  10. Modern projection of the old electroscope for nuclear radiation quantitative work and demonstrations

    Science.gov (United States)

    Oliveira Bastos, Rodrigo; Baltokoski Boch, Layara

    2017-11-01

    Although quantitative measurements in radioactivity teaching and research are only believed to be possible with high technology, early work in this area was fully accomplished with very simple apparatus such as zinc sulphide screens and electroscopes. This article presents an experimental practice using the electroscope, which is a very simple apparatus that has been widely used for educational purposes, although generally for qualitative work. The main objective is to show the possibility of measuring radioactivity not only in qualitative demonstrations, but also in quantitative experimental practices. The experimental set-up is a low-cost ion chamber connected to an electroscope in a configuration that is very similar to that used by Marie and Pierre Currie, Rutherford, Geiger, Pacini, Hess and other great researchers from the time of the big discoveries in nuclear and high-energy particle physics. An electroscope leaf is filmed and projected, permitting the collection of quantitative data for the measurement of the 220Rn half-life, collected from the emanation of the lantern mantles. The article presents the experimental procedures and the expected results, indicating that the experiment may provide support for nuclear physics classes. These practices could spread widely to either university or school didactic laboratories, and the apparatus has the potential to allow the development of new teaching activity for nuclear physics.

  11. Considerations about the present forms of work organization in schools

    Directory of Open Access Journals (Sweden)

    Celso João Ferretti

    2011-10-01

    Full Text Available The article discusses the relationships between the present forms of work organization in schools and the changes that took place in the work organization on contemporary capitalism since those changes played a strong influence on the Brazilian educationalreform of the 90’s. The school administration was very much affected by it on the basis of a functional articulation involving centralization/decentralization strategies and the adoption of a managerial model of work organization. The result is the intensification and the relative loss of control of teachers over their own work and, at the same time, being made responsible for the success or the failure of the reform implementation. This also causes resistances, dissimulations, and the deliberate or the conformist adhesions, which can motivate conflicts. For this reason it is discussed the Ball’s propositions regarding the micro-politics of the school.

  12. Conceptual design statement of work for the immobilized low-activity waste disposal facility, project W-520

    International Nuclear Information System (INIS)

    Pickett, W.W.

    1998-01-01

    This Statement of Work outlines the deliverables and schedule for preparation of the Project W-520 Conceptual Design Report, including, work plans, site development plan, preliminary safety evaluation, and conceptual design

  13. STYLE - A European project on structural integrity: Progress of the work after 2 Years

    International Nuclear Information System (INIS)

    Heussner, Stefan; Nicak, Tomas; Keim, Elisabeth

    2012-01-01

    The purpose of this paper is to present the progress of the work on the EURATOM project STYLE (Structural integrity for lifetime management - non-RPV components). The project focuses on the structural integrity assessment of reactor coolant pressure boundary components (RCPB) relevant to ageing and life time management. The 4-years project started in January 2010 and is now in its third year. Within STYLE realistic failure models for some of the key components will be identified. The range of assessment tools considered will include those for assessment of component failure by advanced fracture mechanics analyses validated on small and large scale experiments, quantification of weld residual stresses by numerical analysis and by measurements, stress corrosion crack initiation and growth effects and assessment of RCPB components (excluding the reactor pressure vessel) under dynamic and seismic loading. Based on theoretical and experimental results, performance assessment and further development of simplified engineering assessment methods (EAM) will be carried out considering both deterministic and probabilistic approaches. Integrity assessment case studies and large scale demonstration experiments will be performed on Mock-ups of safety relevant components. These will include a repair weld in an aged butt-welded austenitic pipe, a dissimilar narrow gap TIG weld (following the EPR design) and a cladded ferritic pipe. Moreover, experiments on specimens and feature test pieces will be carried out to support the large scale Mock-up analyses. The end product of the project ('STYLE TOOLS') will comprise best practice guidelines on the use of advanced tools, on improvement and qualification of EAM as a part of European Leak-before-break (LBB) procedures and on life time management of the integrity of RCPB components in European nuclear power plants. The project is interacting with the European Network of Excellence NUGENIA (former NULIFE). (author)

  14. Mapping and industrial IT project to a 2nd semester design-build project

    DEFF Research Database (Denmark)

    Nyborg, Mads; Høgh, Stig

    2010-01-01

    CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project in the D......CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project...... in the Diploma IT program at the Technical University of Denmark. The system in question is a weighing system operating in a LAN environment. The system is used in the medical industry for producing tablets. We present the design of a curriculum to support the development of major components of the weighing...... system. A simple teaching model for software engineering is presented which combines technical disciplines with disciplines from section 2-4 in the CDIO syllabus. The implementation of a joint project involving several courses supports the CDIO perspective. Already the traditional IT-diploma education...

  15. Moderation and Assessment Project--South West. A Presentation of a Model for Moderating Pupils' Work That Is Teacher Assessed, Developed in England, UK.

    Science.gov (United States)

    Radnor, Hilary

    The Moderation and Assessment Project, South West, was an outgrowth of the Technical and Vocational Educational Initiative of the government of the United Kingdom that attempted to develop more courses with vocational relevance for adolescents. Growing from research projects under the Moderation and Assessment project, a new model of moderation is…

  16. Downplaying model power in IT project work

    DEFF Research Database (Denmark)

    Richter, Anne; Buhl, Henrik

    2004-01-01

    in the research, presented in this article, conducted in a Danish manufacturing company, is how an IT system could be configured to support shopfloor teamwork and enhance the quality of work. The approach is based on participatory design and the concept of "model power". This concept facilitates an understanding...

  17. How Undergraduate Students Use Social Media Technologies to Support Group Project Work

    Science.gov (United States)

    McAliney, Peter J.

    2013-01-01

    Technology continues to evolve and become accessible to students in higher education. Concurrently, teamwork has become an important skill in academia and the workplace and students have adopted established technologies to support their learning in both individual and team project work. Given the emergence of social media technologies, I examined…

  18. Spent nuclear fuel project multi-year work plan WBS {number_sign}1.4.1

    Energy Technology Data Exchange (ETDEWEB)

    Wells, J.L.

    1997-03-01

    The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency.

  19. Site observational work plan for the UMTRA project site at Shiprock, New Mexico

    International Nuclear Information System (INIS)

    1994-09-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the initial document for developing site-specific activities to achieve regulatory compliance in the UMTRA Ground Water Project. The regulatory framework used to select the proposed ground water compliance strategies is presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. The Shiprock site consists of two, interconnected hydrogeologic systems: the terrace system and the floodplain system. Separate compliance strategies are proposed for these two systems. The compliance strategy for the terrace aquifer is no remediation with the application of supplemental standards based on classification of the terrace aquifer as having Class III (limited-use) ground water. The compliance strategy for the floodplain aquifer is active remediation using a subsurface biological barrier. These strategies were selected by applying site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement (PEIS) (DOE, 1994a). The site conceptual model indicates that milling-related contamination has impacted the ground water in the terrace and floodplain aquifers. Ground water occurs in both aquifers in alluvium and in fractures in the underlying Cretaceous age Mancos Shale. A mound of ground water related to fluids from the milling operations is thought to exist in the terrace aquifer below the area where settling ponds were in use during the mill operations. Most of the water occurring in the floodplain aquifer is from recharge from the San Juan River

  20. Savannah River Plant engineering, design, and construction history of ``S`` projects and other work, January 1961--December 1964. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1970-03-01

    The work described in this volume of ``S`` Projects History is an extension of the type of work described in Volume I. E.I. du Pont de flemours & Company had entered into Contract AT (07-2)-l with the United States Atomic Energy Commission to develop, design, construct, install, and operate facilities to produce heavy water, fissionable materials, and related products. Under this contract,, Du Pont constructed and operated the Savannah River Plant. The engineering, design, and construction for most of the larger ``S`` projects was performed by the Engineering DeDartment. For some of the large and many of the smaller projects the Engineering Department was responsible only for the construction because the Atomic Energy Division (AED) of the Explosives Department handled the other phases. The Engineering Department Costruction Division also performed the physical work for many of the plant work orders. This volume includes a general description of the Du Pont Engineering Department activities pertaining to the engineering, design, and construction of the ``S`` projects at the Savannah River Plant; brief summaries of the projects and principal work requests; and supplementary informaticn on a few subjects in Volume I for which final data was not available at the closing date. Projects and other plant engineering work which were handled entirely by the Explosives Department -- AED are not included in this history.

  1. Championing mental health at work: emerging practice from innovative projects in the UK.

    Science.gov (United States)

    Robinson, Mark; Tilford, Sylvia; Branney, Peter; Kinsella, Karina

    2014-09-01

    This paper examines the value of participatory approaches within interventions aimed at promoting mental health and wellbeing in the workplace. Specifically the paper explores data from the thematic evaluation of the Mental Health and Employment project strand within the Altogether Better programme being implemented in England in the Yorkshire and Humber region, which was funded through the BIG Lottery and aimed to empower people across the region to lead better lives. The evaluation combined a systematic evidence review with semi-structured interviews across mental health and employment projects. Drawing on both evaluation elements, the paper examines the potential of workplace-based 'business champions' to facilitate organizational culture change within enterprises within a deprived regional socio-economic environment. First, the paper identifies key policy drivers for interventions around mental health and employment, summarizes evidence review findings and describes the range of activities within three projects. The role of the 'business champion' emerged as crucial to these interventions and therefore, secondly, the paper examines how champions' potential to make a difference depends on the work settings and their existing roles, skills and motivation. In particular, champions can proactively coordinate project strands, embed the project, encourage participation, raise awareness, encourage changes to work procedures and strengthen networks and partnerships. The paper explores how these processes can facilitate changes in organizational culture. Challenges of implementation are identified, including achieving leverage with senior management, handover of ownership to fellow employees, assessing impact and sustainability. Finally, implications for policy and practice are discussed, and conclusions drawn concerning the roles of champions within different workplace environments. © The Author (2013). Published by Oxford University Press. All rights reserved. For

  2. Addiction and Lifestyles in Contemporary Europe: Reframing Addictions Project (ALICE RAP). Final Evaluation Report Deliverable 21.1, Work Package 21

    OpenAIRE

    Mittelmark, Maurice B.

    2016-01-01

    At the onset of the ALICE RAP project, the following objectives, description of work, and main tasks were agreed for Work Package 21: 1. To evaluate the overall functioning of the collaborative research project, using a state-of-art systems model of partnership functioning. 2. To document the interactions and linkages between project inputs, throughputs and outputs as the project unfolds over five years. 3. To facilitate structured discussions involving all pa...

  3. Salt Repository Project. FY-84 technical project plan

    International Nuclear Information System (INIS)

    1984-08-01

    The FY 84 technical plans for the Salt Repository Project (SRP) are briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management (CRWM) program are discused and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 Work Breakdown Structure Tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Test Facilities, Exploratory Shaft, Land Acquisition, and Program Management) in an appendix. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. Milestones and their definitions for the plan year, as well as milestones for the outyears are also presented at this same subtask level for each subtask

  4. Making your presentation fun: creative presentation techniques

    Energy Technology Data Exchange (ETDEWEB)

    KEENEN,MARTHA JANE

    2000-05-18

    What possesses someone to volunteer and go through hoops and red tape to make a presentation at a conference? For that matter, why does anyone ever present anything to anyone? Actually, presentations are a fact of life and there are many reasons for doing a presentation and doing it well. New and existing staff need training and orientation to the way things are done here. Handing all of them a manual and hoping they read it is pretty much a waste of paper. On the other hand, an effective, entertaining and upbeat presentation on the relevant topics is more likely to stick with those people. They will even have a name and face to remember and seek out when they have an issue on or with that topic. This can be a very effective beginning for networking with new peers. The presenter is seen as knowledgeable, as a source of information on company topics and possibly evaluated as a potential mentor or future manager. Project staff and/or peers benefit from clear, concise, presentations of topical knowledge. This is one way that a group working on various aspects of the same project or program can stay in touch and in step with each other. Most importantly, presentations may be the best or only door into the minds (and budgets) of management and customers. These presentations are a wonderful opportunity to address legal and compliance issues, budget, staffing, and services. Here is a chance, maybe the only one, to demonstrate and explain the wonderfulness of a program and the benefit they get by using the services offered most effectively. An interactive presentation on legal and compliance issues can be an effective tool in helping customers and/or management make good risk management decisions.

  5. Summary of case studies presented at the WPDD topical session on stakeholder involvement in decommissioning projects - november 14, 2005

    International Nuclear Information System (INIS)

    Metcalfe, Doug

    2006-01-01

    Full text of publication follows: Two case studies were presented on experiences with stakeholder involvement in decommissioning projects. The first paper described the development of the United Kingdom Atomic Energy Authority's (UKAEA) stakeholder involvement activities for the Dounreay Nuclear Reactor Test Establishment. The second paper presented the US Nuclear Regulatory Commission regulatory process for decommissioning that includes opportunities for public involvement. The presentation contrasted the stakeholder involvement for two commercial US nuclear power plants (NPPs) that completed decommissioning in 2005, the Trojan NPP and the Maine Yankee NPP. The two case studies highlighted the importance of involving stakeholders in decommissioning projects, and provide important lessons learned. The Dounreay case study demonstrated the UKAEA's determination and commitment to continuously improve its stakeholder engagement program. In 2002, the UKAEA set out to broaden its stakeholder program by improving both public understanding and participation. With regard to public understanding, the UKAEA committed to keep the public informed on decommissioning developments, and ensure that communication was in an understandable form. To improve participation, the UKAEA actively worked to identify and engage stakeholders. The UKAEA then made efforts to involve stakeholders in decision-making activities, including the use of stakeholder panels to discuss and consider options for specific aspects of the Dounreay decommissioning and site restoration plan. In 2004, the UKAEA commissioned an independent review of its stakeholder involvement program to assess the program's effectiveness and benchmark it against best practices. The program was found to be useful, and positive feedback was provided on the use of stakeholder panels and the UKAEA's determination to deliver a broad based and effective stakeholder strategy. Recommendations to UKAEA included involving stakeholders

  6. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-08-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year

  7. Site observational work plan for the UMTRA Project site at Riverton, Wyoming

    International Nuclear Information System (INIS)

    1994-09-01

    The site observational work plan (SOWP) for the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the first document for the UMTRA Ground Water Project to address site-specific activities to meet compliance with the U.S. Environmental Protection Agency (EPA) proposed ground water standards (52 FR 36000 (1987)). In support of the activities the regulatory framework and drivers are presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. A combination of the two compliance strategies that will be recommended for this site are no remediation with the application of alternate concentration levels (ACL) and natural flushing in conjunction with institutional controls. ACLs are to be applied to constituents that occur at concentrations above background levels but which are essential nutrients and occur within nutritional ranges and/or have very low toxicity and high dietary intake rates compared to the levels detected in the ground water. The essential premise of natural flushing is that ground water movement and natural attenuation processes will reduce the detected contamination to background levels within 1 00 years. These two recommended compliance strategies were evaluated by applying Riverton site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement. There are three aquifers beneath the site: a surficial unconfined aquifer, a middle semiconfined aquifer, and a deeper confined aquifer. The milling-related contamination at the site has affected both the surficial and semiconfined aquifers, although the leaky shale aquifers separating these units limits the downward migration of contamination into the semiconfined aquifer. A shale aquitard separates the semiconfined aquifer from the underlying confined aquifer which has not been contaminated by milling-related constituents

  8. The TRAIN-project: railway safety and the train driver information environment and work situation. A summary of the main results

    Energy Technology Data Exchange (ETDEWEB)

    Kecklund, L. [MTO Psychology and Swedish National Rail Administration (Sweden); Ingre, M.; Kecklund, G.; Soederstroem, M.; Aakerstedt, T. [National Inst. for Psychosocial Factors and Health (Sweden); Lindberg, E. [Swedish National Rail Administration (Sweden); Jansson, A.; Olsson, E.; Sandblad, B. [Uppsala Univ. (Sweden). Dept. of Human-Computer Interaction; Almqvist, P. [Swedish State Railways (Sweden)

    2001-07-01

    The TRAIN project investigates traffic safety related risks, focusing in particular on the train driver work situation, use of information but also on the supporting safety organisation. It is an on-going project funded and managed by Swedish National Rail Administration and carried out by independent researchers. The project provides a multi-disciplinary investigation by use of a man-technology-organisation (MTO) perspective. Activities performed are task analysis, evaluation of the drivers use of information and interaction with the ATP system as well as analyses of stress, mental workload and work hours. Several methods are being used such as interviews, questionnaires, diaries, activity monitoring and videotapes. This paper gives an overview of the project as well as a short summary of the main results. Detailed results are presented in separate reports as started in the reference list. Some of the main results are that the drivers report severe problems concerning sleepiness on early morning shifts, problems with maintenance on vehicles, lack of information supporting the planning task as well as problems in understanding ATP functions. Two groups of drivers having a feed-back related as opposed to a feed-forward driving style could be identified. In conclusion there is a great need to perform more scientific studies of human factors and railway safety as well as to implement safety management programs including professional human factors competence in the railway industries. (orig.)

  9. Speechline - a method for teaching oral presentation

    DEFF Research Database (Denmark)

    Juel, Henrik

    2015-01-01

    The Speech-line method aims at improving the active rhetorical skills of students, i.e. their ability to present academic subjects in a clear and convincing manner. This is relevant not only for everyday classroom work, but also for oral exams, for presenting research projects, and for addressing...

  10. 1986 progress report on R and D work of the Nuclear Fusion Project (PKF)

    International Nuclear Information System (INIS)

    Kast, G.

    1987-03-01

    The Kernforschungszentrum Karlsruhe (KfK) and the Max-Planck-Institute for Plasma Physics, Garching, have joined to form the Entwicklungsgemeinschaft Kernfusion, and under this roof perform research work on the physical and technical conditions and requirements of using the energy from nuclear fusion, and to plan the design and the construction of the necessary equipment for future large-scale experiments. The activities of the KfK for the development of fusion devices with magnetic confinement have been concentrated in the Nuclear Fusion Project, which cooperates in the European Fusion Technology Programme, on the basis of an association agreement between KfK and Euratom, supported by the European Commission. Supplementary KfK contributions, studies in most cases, create a connection between various fields of work, and prepare the road for new tasks, which in the years to come will be found in the extension of the Fusion Technology Programme and the planning work for NET. The reports collected in this annual survey are contributions from KfK Institutes of the year 1986. An annex presents the Easks taken over by KfK within the Fusion Technology Programme of the EC, and notes on the KfK Institutes taking part in the particular activities facilitate reference to the individual, full-text reports. (orig.) [de

  11. Reducing Stress within the Rehabilitative Work Setting - A Report on the ROSE Project

    Science.gov (United States)

    Wells, John S. G.; Denny, Margaret

    Reducing Occupational Stress in Employment (ROSE) is an EU funded project which aims to develop a combined person and work directed stress management programme in order to improve the long-term retention of staff in the vocational rehabilitation sector for mental health and intellectual disabilities.

  12. Compensatory Self-Presentation in Upward Comparison Situations

    Science.gov (United States)

    Tyler, James M.

    2009-01-01

    This article focuses on the communication of compensatory self-presentations (CSP) (i.e., self-presentations that people engage in after publicly receiving unfavorable feedback), with prior work showing that people prudently constrain CSP to areas unrelated (vs. related) to the initial feedback. With the current project we examine the influence…

  13. The CEDICAE and the paper collections conservation and restoration Laboratory at CNEA : present and future organization and projects

    International Nuclear Information System (INIS)

    Calvo, Ana M.; Semino, Maria S.; Romero, Gregoria O.; Alfaro, Laura S.; Miranda, Maria V.; Chinen, Silvia P.

    2009-01-01

    example, it is the work that is being conducted for the Monastery of San Francisco, the oldest in the city of Buenos Aires. In order to do this, a contact with the Friar Jorge Stipech, as the authority in charge, was established. A survey of the state of the valuable collection was made, photographic documentation was taken, the material status observed and the conclusions were reached that almost all of the fifteen thousand volumes were seriously infected with insects and fungi. A report was presented to the institution encouraging urgently to get a grant to carry out the project of adding value to the Library, building conditioning and treatment to solve damage of the material, its restoration and digitization. But, in the meantime, it was decided to collaborate to our objective, do the cleaning, restoration and digitization of the documentary fund formed by the 275 Authentic that certify the authenticity of the relics of the Saints owned by the museum. Another material of great value and in an advanced state of deterioration is a letter that was found inside the head of the statue of Dante Alighieri, located in the frontispiece of the Church, a decree signed by the former President Juan Domingo Peron and some engravings of great dimensions. The Authentics are realised on support paper and parchment. The printed ones on paper were cleaned with grated rubber and soft brush and then restored with a solution of metilcellulose and calcium carbonate, and the gaps were filled with Japanese paper. The Authentics made in support parchment were cleaned with soft brush and soon they were washed with water. After this process, they were let dry in drying tray, kept in folders made in free acid paper, pressed during one week or more as needed and then digitized. Fungi severely attacked material has been recovered previously treated with gamma radiation for its disinfection. Also physicochemical characterization tests have been realised of the papers that are used for the

  14. Present and future of probabilistic safety analysis of Juragua Nuclear Power Plant

    International Nuclear Information System (INIS)

    Salomon, J.; Rivero, J.J.

    1993-01-01

    This work present the main conditions of probabilistic safety analysis of Juragua Nuclear Power Plant, which includes the following aspects: Staff preparedness; Creation of ANCON code; Analysis activity; IAEA technical assistance project. The present situation of PSA National Project and its perspectives development are reported

  15. Photovoltaic Programme, Edition 2006. Summary report. Project list. Annual project reports 2005; Programm Photovoltaik, Ausgabe 2006. Ueberblicksbericht. Liste der Projekte. Jahresberichte der Beauftragten 2005

    Energy Technology Data Exchange (ETDEWEB)

    Nowak, S.

    2006-07-01

    This comprehensive, illustrated report for the Swiss Federal Office of Energy (SFOE) presents an overview of the work done as part of the 2005 research programme, along with the annual reports of the project leaders on research projects. It presents the programme's main points of focus, discusses the work done and the results obtained. Areas covered include cell technology (13 reports), solar modules and building integration (3 reports) , system technology (4 reports) as well as various further projects (5) that are connected with photovoltaics. Four further reports concern international co-operation. Further, several pilot and demonstration (P+D) projects are discussed. Lists of all research and development projects and pilot and demonstration projects are supplied. Work done at several institutions in Switzerland and at leading commercial companies is described.

  16. Photovoltaic Programme, Edition 2006. Summary report. Project list. Annual project reports 2005; Programm Photovoltaik, Ausgabe 2006. Ueberblicksbericht. Liste der Projekte. Jahresberichte der Beauftragten 2005

    Energy Technology Data Exchange (ETDEWEB)

    Nowak, S

    2006-07-01

    This comprehensive, illustrated report for the Swiss Federal Office of Energy (SFOE) presents an overview of the work done as part of the 2005 research programme, along with the annual reports of the project leaders on research projects. It presents the programme's main points of focus, discusses the work done and the results obtained. Areas covered include cell technology (13 reports), solar modules and building integration (3 reports) , system technology (4 reports) as well as various further projects (5) that are connected with photovoltaics. Four further reports concern international co-operation. Further, several pilot and demonstration (P+D) projects are discussed. Lists of all research and development projects and pilot and demonstration projects are supplied. Work done at several institutions in Switzerland and at leading commercial companies is described.

  17. The work and recovery project: changing organizational culture and practice in New York City outpatient services.

    Science.gov (United States)

    Pascaris, Alysia; Shields, Leslie Reed; Wolf, Jessica

    2008-01-01

    Complex and multiple barriers confront out-patient programs in promoting recovery and addressing mental health recipients' work-related goals. This article describes a focused organizational change project utilizing intensive consultation and technical assistance within five New York City outpatient psychiatric services. The project aimed to increase staff exposure to, understanding and use of work-related and recovery-based concepts to promote consumers' recovery and attainment of employment goals. Tailored assessment, curriculum delivery, and identification and implementation of change objectives were useful strategies in promoting change. This change model can serve to assist programs in their efforts to integrate new approaches and to better understand changes among leadership, staff and consumers, and changes in organizational culture and practice required to support a work and recovery-oriented service paradigm. The project experience suggests that adopting and embracing new practices takes time. Varied and incremental steps toward programmatic and operational changes can be significant and can reap authentic sustainable change occurring in the process of learning, experiencing, internalizing and adjusting to new methods of practice.

  18. Collective Efficacy and Its Relationship with Leadership in a Computer-Mediated Project-Based Group Work

    Science.gov (United States)

    Huh, Yeol; Reigeluth, Charles M.; Lee, Dabae

    2014-01-01

    Based on Bandura's work, the four sources of efficacy shaping were examined in regard to frequency and students' perception of importance in a computer-mediated, project-based high school classroom. In a context of group work where there was no designated leader, groups' collective efficacy was examined if it has any relationship with individual's…

  19. Presentations and documents submitted to the 27. meeting of the Working Party on International Nuclear Data Evaluation Co-operation (WPEC), NEA Headquarters, 21-22 May 2015

    International Nuclear Information System (INIS)

    Chadwick, Mark; Danon, Yaron; Dunn, Mike; Herman, Mike; Kahler, Albert; Fischer, Ulrich; Jacqmin, Robert; Koning, Arjan; Plompen, Arjan; Fukahori, Tokio; Harada, Hideo; Igashira, Masayuki; Iwamoto, Osamu; Yokoyama, Kenji; Golashvili, Tengiz; Ignatiev, Victor; Ignatyuk, Anatoly; Oleynik, Dimitry S.; Sinitsa, Valentin; Ge, Zhigang; Trkov, Andrej; De Saint Jean, Cyrille; Kawano, Toshihiko; Schillebeeckx, Peter; Mills, Robert; Mcnabb, Dennis; Palmiotti, Giuseppe; Cabellos, Oscar; ); Lee, Young-Ouk; Kim, Do Heon; Ruan, Xichao; Wu, Haicheng

    2015-05-01

    The NEA's nuclear data evaluation co-operation activities involve the following evaluation projects: ENDF (United States), JENDL (Japan), ROSFOND/BROND (Russia), JEFF (other Data Bank member countries) and CENDL (China) in close co-operation with the Nuclear Data Section of the International Atomic Energy Agency (IAEA). The working party was established to promote the exchange of information on nuclear data evaluations, measurements, nuclear model calculations, validation, and related topics, and to provide a framework for co-operative activities between the participating projects. The working party assesses nuclear data improvement needs and addresses these needs by initiating joint evaluation and/or measurement efforts. This document brings together the available documents and presentations relative to this meeting: the agenda, the Summary record of the previous meeting held on May 2014, the Reports (slides) on experimental activities from Europe, Japan, USA, Russia and China, the Brief progress reports from the evaluation projects (ENDF, JEFF, JENDL, ROSFOND, CENDL, IAEA, TENDL), the presentation from Subgroup 39 (Methods and approaches to provide feedback from nuclear and covariance data adjustment for improvement of nuclear data files) and from Subgroup 41 (Improving nuclear data accuracy of 241 Am and 237 Np capture cross-sections). The document ends with a preliminary proposal for a New Subgroup 42 (Thermal Scattering Kernel S(α,β): Measurement, Evaluation and Application)

  20. Features of theYounger Schoolboys’ Attitude to the Fine Works of Art Presented at the Reproduction and Computer Presentations

    Directory of Open Access Journals (Sweden)

    Eremeev M.A.,

    2017-01-01

    Full Text Available There is an issue, which is connected with the active using of multimedia technology in education, including art. The question of the effectiveness of the production computer presentation as compared with the traditional method of production in getting acquainted students with the works of art. It is presented a study, which is aimed to analyze the differences in the perception of junior school children works of art, depending on the format of presentation (reproduction, the electronic form. It is explained a special designed method for this study, called "Talk about your impressions". There were 60 students, of the second grade progymnasium number 1756, who were involved in this study. The method "Talk about your impressions" is used to identify differences in the perception of works of art, depending on the presentation format. In order to identify the differences in the understanding of the subjects of figurative content of the picture, depending on the development of imaginative and logical thinking, and the stability and concentration following methods were used: Test Toulouse-Pieroni, Raven Progressive Matrices, the method of semantic differential Charles Osgood (modification of Guruzhapova V.A.. The results showed that the vast majority of the subjects in the comparison of the situation identical pictures, but in different formats (reproduction, electronic format prefer reproduction. It is shown that the understanding of a holistic way of painting subjects are not related to the format requirements of the pictures. It was found that the difference in the understanding of younger schoolboys figurative content of the picture does not dependent on the development of imaginative or logical thinking, and on the stability and concentration. This work was performed by grant of Davydov V. V.

  1. The CAREM reactor and present currents in reactor design

    International Nuclear Information System (INIS)

    Ordonez, J.P.

    1990-01-01

    INVAP has been working on the CAREM project since 1983. It concerns a very low power reactor for electrical energy generation. The design of the reactor and the basic criteria used were described in 1984. Since then, a series of designs have been presented for reactors which are similar to CAREM regarding the solutions presented to reduce the chance of major nuclear accidents. These designs have been grouped under different names: Advanced Reactors, Second Generation Reactors, Inherently Safe Reactors, or even, Revolutionary Reactors. Every reactor fabrication firm has, at least, one project which can be placed in this category. Presently, there are two main currents of Reactor Design; Evolutionary and Revolutionary. The present work discusses characteristics of these two types of reactors, some revolutionary designs and common criteria to both types. After, these criteria are compared with CAREM reactor design. (Author) [es

  2. Knowledge Translation of Interprofessional Collaborative Patient-Centred Practice: The Working Together Project Experience

    Science.gov (United States)

    MacDonald, Colla J.; Archibald, Douglas; Stodel, Emma; Chambers, Larry W.; Hall, Pippa

    2008-01-01

    The Working Together (WT) project involved the design and delivery of an online learning resource for healthcare teams in long-term care (LTC) so that knowledge regarding interprofessional collaborative patient-centred practice (ICPCP) could be readily accessed and then transferred to the workplace. The purpose of this paper is to better…

  3. Severn Barrage project. Detailed report - V. 5

    Energy Technology Data Exchange (ETDEWEB)

    1989-01-01

    Prior to the present programme of work, the effects which a tidal power barrage would have on the region, during both construction and operation, had not been studied in detail. This volume of the Detailed Report therefore represents a significant extension of work into these aspects of the Severn Barrage Project. In the Regional Study, a number of benefits have been identified, some of which may represent net benefits nationally. The economic assessment of both regional and national benefits and costs is presented. The second part of this volume reports on the work done on the Legal Background for the Project. (author).

  4. A ProCoS II Project Final Report: ESPRIT Basic Research project 707

    DEFF Research Database (Denmark)

    Bowen, J. P.; Hoare, C. A. R.; Langmaack, Hans

    1996-01-01

    An overview of the research and associated activities of the Europeancollaborative ESPRIT Basic Research ProCoS II project (no. 7071) on``Provably Correct Systems'' which ran from 1992 to 1995 is presented.This was a follow-on project to ProCoS (no. 3104) and ran inparallel with the ProCoS Working...

  5. Site 300 hazardous-waste-assessment project. Interim report: December 1981. Preliminary site reconnaissance and project work plan

    International Nuclear Information System (INIS)

    Raber, E.; Helm, D.; Carpenter, D.; Peifer, D.; Sweeney, J.

    1982-01-01

    This document was prepared to outline the scope and objectives of the Hazardous Waste Assessment Project (HWAP) at Site 300. This project was initiated in October, 1981, to investigate the existing solid waste landfills in an effort to satisfy regulatory guidelines and assess the potential for ground-water contamination. This involves a site-specific investigation (utilizing geology, hydrology, geophysics and geochemistry) with the goal of developing an effective ground-water quality monitoring network. Initial site reconnaissance work has begun and we report the results, to date, of our geologic hydrogeologic studies. All known solid waste disposal locations are underlain by rocks of either the Late Miocene Neroly Formation or the Cierbo Formation, both of which are dominantly sandstones interbedded with shale and claystone. The existence of a regional confined (artesian) aquifer, as well as a regional water-table aquifer is postulated for Site 300. Preliminary analysis has led to an understanding of directions and depths of regional ground-water flow

  6. Project management the agile way making it work in the enterprise

    CERN Document Server

    Goodpasture, John C

    2016-01-01

    Widely acclaimed as one of the top Agile books and a recommended resource for the PMI-ACP Exam in its first edition, Project Management the Agile Way by popular demand has been updated and redesigned. This second edition is in modular format to facilitate training and advanced course instruction, and provides new coverage of Agile, such as hybrid agile methods, the latest public sector practices, and a chapter dedicated to transitioning to agile. It discusses the "grand bargain" between project management and business, the shift in dominance from plans to product, and from input to output, and introduces new concepts such as return on benefit. Experienced practitioners and students that want to learn how to make agile work effectively in the enterprise should read this book. Individuals preparing for the PMI Agile Certified Practitioner (PMI-ACP) examination, and training providers developing courses, will find this second edition quite helpful.

  7. The SOLUTIONS project: challenges and responses for present and future emerging pollutants in land and water resources management.

    Science.gov (United States)

    Brack, Werner; Altenburger, Rolf; Schüürmann, Gerrit; Krauss, Martin; López Herráez, David; van Gils, Jos; Slobodnik, Jaroslav; Munthe, John; Gawlik, Bernd Manfred; van Wezel, Annemarie; Schriks, Merijn; Hollender, Juliane; Tollefsen, Knut Erik; Mekenyan, Ovanes; Dimitrov, Saby; Bunke, Dirk; Cousins, Ian; Posthuma, Leo; van den Brink, Paul J; López de Alda, Miren; Barceló, Damià; Faust, Michael; Kortenkamp, Andreas; Scrimshaw, Mark; Ignatova, Svetlana; Engelen, Guy; Massmann, Gudrun; Lemkine, Gregory; Teodorovic, Ivana; Walz, Karl-Heinz; Dulio, Valeria; Jonker, Michiel T O; Jäger, Felix; Chipman, Kevin; Falciani, Francesco; Liska, Igor; Rooke, David; Zhang, Xiaowei; Hollert, Henner; Vrana, Branislav; Hilscherova, Klara; Kramer, Kees; Neumann, Steffen; Hammerbacher, Ruth; Backhaus, Thomas; Mack, Juliane; Segner, Helmut; Escher, Beate; de Aragão Umbuzeiro, Gisela

    2015-01-15

    SOLUTIONS (2013 to 2018) is a European Union Seventh Framework Programme Project (EU-FP7). The project aims to deliver a conceptual framework to support the evidence-based development of environmental policies with regard to water quality. SOLUTIONS will develop the tools for the identification, prioritisation and assessment of those water contaminants that may pose a risk to ecosystems and human health. To this end, a new generation of chemical and effect-based monitoring tools is developed and integrated with a full set of exposure, effect and risk assessment models. SOLUTIONS attempts to address legacy, present and future contamination by integrating monitoring and modelling based approaches with scenarios on future developments in society, economy and technology and thus in contamination. The project follows a solutions-oriented approach by addressing major problems of water and chemicals management and by assessing abatement options. SOLUTIONS takes advantage of the access to the infrastructure necessary to investigate the large basins of the Danube and Rhine as well as relevant Mediterranean basins as case studies, and puts major efforts on stakeholder dialogue and support. Particularly, the EU Water Framework Directive (WFD) Common Implementation Strategy (CIS) working groups, International River Commissions, and water works associations are directly supported with consistent guidance for the early detection, identification, prioritisation, and abatement of chemicals in the water cycle. SOLUTIONS will give a specific emphasis on concepts and tools for the impact and risk assessment of complex mixtures of emerging pollutants, their metabolites and transformation products. Analytical and effect-based screening tools will be applied together with ecological assessment tools for the identification of toxicants and their impacts. The SOLUTIONS approach is expected to provide transparent and evidence-based candidates or River Basin Specific Pollutants in the case

  8. PHEV/EV Li-Ion Battery Second-Use Project (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Neubauer, J.; Pesaran, A.

    2010-04-01

    Accelerated development and market penetration of plug-in hybrid electric vehicles (PHEVs) and electric vehicles (Evs) are restricted at present by the high cost of lithium-ion (Li-ion) batteries. One way to address this problem is to recover a fraction of the battery cost via reuse in other applications after the battery is retired from service in the vehicle, if the battery can still meet the performance requirements of other energy storage applications. In several current and emerging applications, the secondary use of PHEV and EV batteries may be beneficial; these applications range from utility peak load reduction to home energy storage appliances. However, neither the full scope of possible opportunities nor the feasibility or profitability of secondary use battery opportunities have been quantified. Therefore, with support from the Energy Storage activity of the U.S. Department of Energy's Vehicle Technologies Program, the National Renewable Energy Laboratory (NREL) is addressing this issue. NREL will bring to bear its expertise and capabilities in energy storage for transportation and in distributed grids, advanced vehicles, utilities, solar energy, wind energy, and grid interfaces as well as its understanding of stakeholder dynamics. This presentation introduces NREL's PHEV/EV Li-ion Battery Secondary-Use project.

  9. Mothers and work-life balance: Exploring the contradictions and complexities involved in work-family negotiation

    NARCIS (Netherlands)

    L. Wattis (Louise); J.F. Standing (Joseph); M.A. Yerkes (Mara)

    2013-01-01

    textabstractThis article presents data from a project exploring women's experiences of work and care. It focuses primarily on work-life balance as a problematic concept. Social and economic transformations across advanced post-industrial economies have resulted in concerns about how individuals

  10. Cascade Error Projection Learning Algorithm

    Science.gov (United States)

    Duong, T. A.; Stubberud, A. R.; Daud, T.

    1995-01-01

    A detailed mathematical analysis is presented for a new learning algorithm termed cascade error projection (CEP) and a general learning frame work. This frame work can be used to obtain the cascade correlation learning algorithm by choosing a particular set of parameters.

  11. Characteristics of the process of culture development project activities (culture of social engineering) at the future bachelors of social work

    OpenAIRE

    Natalya I. Nikitina; Elena Yu. Romanovaa; Tatyana V. Vasilyeva; Irina N. Nikishina; Veronica M. Grebennikova

    2017-01-01

    In modern Russia professional activity productivity of social work specialist depends largely on his abilities and skills in the field of social design. University graduate`s (social work bachelor`s) high level of professional-project activity culture can be regarded as one of the necessary conditions of successful labour market adaptation of young specialists in social sphere institutions. The article discusses various aspects of future social work bachelors` vocational project activity cult...

  12. Influence of Personality and Motivation on Oral Presentation Performance.

    Science.gov (United States)

    Liang, Hsin-Yi; Kelsen, Brent

    2018-01-19

    Personality and motivation have been identified as influential variables associated with foreign language learning; however, few studies have investigated their effect on oral presentations. This study addresses the importance of both personality and motivation in students' collaborative oral presentation performance. A Big Five personality trait questionnaire measuring Extraversion, Agreeableness, Conscientiousness, Neuroticism and Openness to Experience, together with the Collaborative Inquiry-based Project Questionnaire measuring Task, Project Work, Reinforcement, Social Learning and Social Pressure motivational constructs were employed to evaluate 257 university students. In general, the results showed that Extraversion, Project Work and Social Pressure were significant correlates of oral presentation scores. The first result suggests that extraverts possess superiority in situations where oral language production is central to communication. This was particularly true for lower-level students, inferring that extraverted personalities can compensate for a lower English language ability. The second indicates that the inquiry-based nature of the assignments was an intrinsic motivator especially valued by extraverts. The third implies that extrinsic motivation was a factor influencing student performance. These findings extend previous research by highlighting the contextual relationships between these affective variables and performance in collaborative oral presentation contexts.

  13. The Halden Reactor Project workshop meeting on control room development

    International Nuclear Information System (INIS)

    Miberg, Ann Britt; Green, Marie; Haukenes, Hanne; Larsen, Marit; Seim, Lars Aage; Veland, Oeystein

    1999-03-01

    The 'Control Room Development' workshop was organised in. Halden, November 5-6, 1998. The purpose of the workshop was to bring forward recommendations for the future use of HAMMLAB with respect to control room development. The workshop comprised thirteen presentations summarising current issues and status in control room development projects and related projects. Following the presentations, five working groups were formed. The purpose of the working groups was to establish a set of recommendations for the future use of HAMMLAB. Each working group developed a set of recommendations. The outcomes of the working groups' discussions were summarised in plenum by the working group chairs. During the workshop, all participants excluding the Halden Project staff were asked to fill in a questionnaire indicating which research topics they found most interesting to pursue in future HAMMLAB research. The purpose of this report is to summarise the workshop participants' presentations, the working groups' discussions, and the recommendations given by the workshop participants concerning the future use of HAMMLAB (author) (ml)

  14. Educational Interdisciplinarity in the High School through working with Pedagogical Projects

    Directory of Open Access Journals (Sweden)

    Irinéa de Lourdes Batista

    2008-08-01

    Full Text Available In this research, an understanding about scholar interdisciplinarity and project working is brought, aiming at showing that the last one is an alternative methodological to promote an interdisciplinary educative practice. Therefore a pedagogical proposal was built to implement interdisciplinarity in Science and Mathematics Education in High School. It is exposed the theoretical syntheses, analysis and discussions concerning the pertinence and possibility to implement the proposal studied by the teachers and pedagogical staff in a public High School in the State of Paraná, Brazil.

  15. Reading Time Allocation Strategies and Working Memory Using Rapid Serial Visual Presentation

    Science.gov (United States)

    Busler, Jessica N.; Lazarte, Alejandro A.

    2017-01-01

    Rapid serial visual presentation (RSVP) is a useful method for controlling the timing of text presentations and studying how readers' characteristics, such as working memory (WM) and reading strategies for time allocation, influence text recall. In the current study, a modified version of RSVP (Moving Window RSVP [MW-RSVP]) was used to induce…

  16. Looking after Lawns and Bedding. Youth Training Scheme. Core Exemplar Work Based Project.

    Science.gov (United States)

    Further Education Staff Coll., Blagdon (England).

    This trainer's guide is intended to assist supervisors of work-based career training projects in teaching students about lawn care. The guide is one in a series of core curriculum modules that is intended for use in combination on- and off-the-job programs to familiarize youth with the skills, knowledge, and attitudes necessary for success in the…

  17. Characteristics of Successful Internal Medicine Resident Research Projects: Predictors of Journal Publication Versus Abstract Presentation.

    Science.gov (United States)

    Atreya, Auras R; Stefan, Mihaela; Friderici, Jennifer L; Kleppel, Reva; Fitzgerald, Janice; Rothberg, Michael B

    2018-02-06

    To identify the characteristics of successful research projects at an internal medicine residency program with an established research curriculum. The authors collected data about all research projects initiated by or involving medicine residents from 2006 to 2013 at Baystate Medical Center, using departmental files and institutional review board applications. Resident and mentor characteristics were determined using personnel files and Medline searches. Using multivariable models, the authors identified predictors of successful completion of projects using adjusted prevalence ratios (PRs). The primary outcome was manuscript publication by resident and secondary outcome was either publication or regional/national presentation. Finally, residents were surveyed to identify barriers and/or factors contributing to project completion. Ninety-four research projects were identified: 52 (55.3%) projects achieved the primary outcome and 72 (76.5%) met the secondary outcome, with overlap between categories. Most study designs were cross-sectional (41, 43.6%) or retrospective cohort (30, 31.9%). After adjustment, utilization of the epidemiology/biostatistical core (PR = 2.09; 95% CI: 1.36, 3.21), established publication record of resident (PR = 1.54, 95% CI: 1.14, 2.07), and resident with U.S. medical education (PR = 1.39, 95% CI: 1.02, 1.90) were associated with successful completion of projects. Mentor publication record (PR = 3.13) did not retain significance due to small sample size. Most respondents (65%) cited "lack of time" as a major project barrier. Programs seeking to increase resident publications should consider an institutional epidemiology/biostatistical core available to all residency research projects, and residents should choose experienced mentors with a track record of publications.

  18. Los Alamos Science: The Human Genome Project. Number 20, 1992

    Science.gov (United States)

    Cooper, N. G.; Shea, N. eds.

    1992-01-01

    This document provides a broad overview of the Human Genome Project, with particular emphasis on work being done at Los Alamos. It tries to emphasize the scientific aspects of the project, compared to the more speculative information presented in the popular press. There is a brief introduction to modern genetics, including a review of classic work. There is a broad overview of the Genome Project, describing what the project is, what are some of its major five-year goals, what are major technological challenges ahead of the project, and what can the field of biology, as well as society expect to see as benefits from this project. Specific results on the efforts directed at mapping chromosomes 16 and 5 are discussed. A brief introduction to DNA libraries is presented, bearing in mind that Los Alamos has housed such libraries for many years prior to the Genome Project. Information on efforts to do applied computational work related to the project are discussed, as well as experimental efforts to do rapid DNA sequencing by means of single-molecule detection using applied spectroscopic methods. The article introduces the Los Alamos staff which are working on the Genome Project, and concludes with brief discussions on ethical, legal, and social implications of this work; a brief glimpse of genetics as it may be practiced in the next century; and a glossary of relevant terms.

  19. Los Alamos Science: The Human Genome Project. Number 20, 1992

    Energy Technology Data Exchange (ETDEWEB)

    Cooper, N G; Shea, N [eds.

    1992-01-01

    This article provides a broad overview of the Human Genome Project, with particular emphasis on work being done at Los Alamos. It tries to emphasize the scientific aspects of the project, compared to the more speculative information presented in the popular press. There is a brief introduction to modern genetics, including a review of classic work. There is a broad overview of the Genome Project, describing what the project is, what are some of its major five-year goals, what are major technological challenges ahead of the project, and what can the field of biology, as well as society expect to see as benefits from this project. Specific results on the efforts directed at mapping chromosomes 16 and 5 are discussed. A brief introduction to DNA libraries is presented, bearing in mind that Los Alamos has housed such libraries for many years prior to the Genome Project. Information on efforts to do applied computational work related to the project are discussed, as well as experimental efforts to do rapid DNA sequencing by means of single-molecule detection using applied spectroscopic methods. The article introduces the Los Alamos staff which are working on the Genome Project, and concludes with brief discussions on ethical, legal, and social implications of this work; a brief glimpse of genetics as it may be practiced in the next century; and a glossary of relevant terms.

  20. Optimizing strategy for repetitive construction projects within multi-mode resources

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-03-01

    Full Text Available Estimating tender data for specific project is the most essential part in construction areas as of a contractor’s view such as: proposed project duration with corresponding gross value and cash flows. Cash flow analysis of construction projects has a long history and has been an important topic in construction management. Determination of project cash flows is very sensitive, especially for repetitive construction projects. This paper focuses on how to calculate tender data for repetitive construction projects such as: project duration, project cost, project/bid price, project cash flows, project maximum working capital and project net present value that is equivalent to net profit at the beginning of the project. A simplified multi-objective optimization formulation will be presented that creates best tender data to contractor comparing with more feasible options that are generated from multi-mode resources in a given project. This mathematical formulation is intended to give more scenarios which provide a practical support for typical construction contractors who need to optimize resource utilization in order to minimize project duration, project/bid price and project maximum working capital while maximizing its net present value simultaneously. At the end of the paper, an illustrative example will be presented to demonstrate the applications of proposed technique to an optimization expressway of repetitive construction project.

  1. Learning how scientists work: experiential research projects to promote cell biology learning and scientific process skills.

    Science.gov (United States)

    DebBurman, Shubhik K

    2002-01-01

    Facilitating not only the mastery of sophisticated subject matter, but also the development of process skills is an ongoing challenge in teaching any introductory undergraduate course. To accomplish this goal in a sophomore-level introductory cell biology course, I require students to work in groups and complete several mock experiential research projects that imitate the professional activities of the scientific community. I designed these projects as a way to promote process skill development within content-rich pedagogy and to connect text-based and laboratory-based learning with the world of contemporary research. First, students become familiar with one primary article from a leading peer-reviewed journal, which they discuss by means of PowerPoint-based journal clubs and journalism reports highlighting public relevance. Second, relying mostly on primary articles, they investigate the molecular basis of a disease, compose reviews for an in-house journal, and present seminars in a public symposium. Last, students author primary articles detailing investigative experiments conducted in the lab. This curriculum has been successful in both quarter-based and semester-based institutions. Student attitudes toward their learning were assessed quantitatively with course surveys. Students consistently reported that these projects significantly lowered barriers to primary literature, improved research-associated skills, strengthened traditional pedagogy, and helped accomplish course objectives. Such approaches are widely suited for instructors seeking to integrate process with content in their courses.

  2. Chernobyl Studies Project: Working group 7.0, Environmental transport and health effects. Progress report, March--September 1994

    Energy Technology Data Exchange (ETDEWEB)

    Anspaugh, L.R.; Hendrickson, S.M. [eds.

    1994-12-01

    In April 1988, the US and the former-USSR signed a Memorandum of Cooperation (MOC) for Civilian Nuclear Reactor Safety; this MOC was a direct result of the accident at the Chernobyl Nuclear Power Plant Unit 4 and the following efforts by the two countries to implement a joint program to improve the safety of nuclear power plants and to understand the implications of environmental releases. A Joint Coordinating Committee for Civilian Nuclear Reactor Safety (JCCCNRS) was formed to implement the MOC. The JCCCNRS established many working groups; most of these were the responsibility of the Nuclear Regulatory Commission, as far as the US participation was concerned. The lone exception was Working Group 7 on Environmental Transport and Health Effects, for which the US participation was the responsibility of the US Department of Energy (DOE). The purpose of Working Group 7 was succintly stated to be, ``To develop jointly methods to project rapidly the health effects of any future nuclear reactor accident.`` To implement the work DOE then formed two subworking groups: 7.1 to address Environmental Transport and 7.2 to address Health Effects. Thus, the DOE-funded Chernobyl Studies Project began. The majority of the initial tasks for this project are completed or near completion. The focus is now turned to the issue of health effects from the Chernobyl accident. Currently, we are involved in and making progress on the case-control and co-hort studies of thyroid diseases among Belarussian children. Dosimetric aspects are a fundamental part of these studies. We are currently working to implement similar studies in Ukraine. A major part of the effort of these projects is supporting these studies, both by providing methods and applications of dose reconstruction and by providing support and equipment for the medical teams.

  3. A Study of sensory and nutritional quality of virgin olive oil. Presentation of a European project of research

    Directory of Open Access Journals (Sweden)

    Esposito, Giovanni

    1994-04-01

    Full Text Available The purpose of this paper is to present, in a synthesis, the objectives and means of the FLAIR project on olive oil quality (FLAIR proposal N.- 89041, contract N° AGRF - GT91 - 0046. Comments are reported on the scientific assumptions and practical problems that have motivated this research. The participants are also presented with their roles and tasks in the project.

  4. Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach

    OpenAIRE

    Miao, Yongwu; Sloep, Peter; Koper, Rob

    2009-01-01

    Miao, Y., Sloep, P. B., & Koper, R. (2010). Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach. In D. Griffiths & R. Koper (Eds.), Rethinking Learning and Employment at a Time of Economic Uncertainty. Proceedings of the 6th TENCompetence Open workshop (pp. 22-33). November, 19-20, 2009, Manchester, UK. Bolton, UK: Institute for Educational Cybernetics, The University of Bolton. For the complete book please see http://hdl.handle.net/1820/3191

  5. San Gregorio mining: general presentation of the enterprise

    International Nuclear Information System (INIS)

    1997-01-01

    This work is a project presented by San Gregorio Mine.This company is responsible for the extraction and gold ore deposits benefits in San Gregorio and East extension in Minas de Corrales. For this project was carried out an environmental impact study as well as and agreement with the LATU for the laboratory analyzes and the surface and groundwater monitoring within the Environmental program established by the Company

  6. Managing complex, high risk projects a guide to basic and advanced project management

    CERN Document Server

    Marle, Franck

    2016-01-01

    Maximizing reader insights into project management and handling complexity-driven risks, this book explores propagation effects, non-linear consequences, loops, and the emergence of positive properties that may occur over the course of a project. This book presents an introduction to project management and analysis of traditional project management approaches and their limits regarding complexity. It also includes overviews of recent research works about project complexity modelling and management as well as project complexity-driven issues. Moreover, the authors propose their own new approaches, new methodologies and new tools which may be used by project managers and/or researchers and/or students in the management of their projects. These new elements include project complexity definitions and frameworks, multi-criteria approaches for project complexity measurement, advanced methodologies for project management (propagation studies to anticipate potential behaviour of the project, and clustering approaches...

  7. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    Science.gov (United States)

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  8. Using the Apple iPad to facilitate student-led group work and seminar presentation.

    Science.gov (United States)

    Davies, Mark

    2014-08-01

    Mobile technology has become progressively more visible within the Higher Education learning environment, and is, in the author's experience, often used casually by students to support their learning. The project outlined within this paper examines the efficacy of using such technology (Apple iPad) more formally in facilitating increased levels of interaction and group cohesion within a series of tutorial sessions involving undergraduate nursing students (n = 24). For the purposes of the project, a tutorial group was created and facilitated in which the students undertook and fed back upon a series of specific iPad supported activities. Data was collected at the mid point and cessation of the project. The outcomes were most encouraging, and indicated that mobile computing platforms of this type may indeed help students to engage more fully with learning activities and materials, and as a corollary, increase student confidence with peer presentation and feedback. Copyright © 2014 Elsevier Ltd. All rights reserved.

  9. EASYTRAC Project: Work package 6.4 Reversal technique to calibrate gear and thread standards

    DEFF Research Database (Denmark)

    Carmignato, Simone; De Chiffre, Leonardo; Larsen, Erik

    This report was produced as a part of the project EASYTRAC, an EU project under the programme Competitive and Sustainable Growth: Contract No. G6RD-CT-2000-00188, coordinated by UNIMETRIK S.A. (Spain). The project is concerned with low uncertainty calibrations on coordinate measuring machines (CM...... (PTB) - Germany and Tampere University of Technology (TUT) - Finland. The present report describes feasibility and experimental results of a reversal and substitute element technique application for thread calibration on CMMs....

  10. Interactive Spherical Projection Presentations teach students about the Moon

    Science.gov (United States)

    Sherman, S. B.; Pilger, E.; James, B.; Au, C.; Lum, K.; Gillis-Davis, J. J.

    2011-12-01

    Using data from Clementine, Lunar Orbiter, Lunar Prospector, as well as the Lunar Reconnaissance Orbiter (LRO) mission we are creating multimedia applications for the Magic Planet (MP) and Science on a Sphere (SOS), spherical displays for digital media, for the Moon. Presenting the data on this innovative and stimulating medium captures the interest, stimulates curiosity, and inspires scientific learning in children, as well as general audiences. One such presentation is an interactive game where the audience uses "clickers" to vote on the location of their own lunar base determined by available resources, such as proximity to water ice, illumination (source of solar power), TiO,2, (oxygen production) and hydrogen abundances as well as local topography. The interactive nature accommodates a variety of knowledge levels and can be adapted in real-time accordingly. The clickers are used as an assessment tool as well as a means for audience to control the direction of the application. As an assessment tool audience members can make predictions and answer questions using the clicker. In addition, the audience can use the clickers to vote on what they want to do, see, or go next. Having control over the direction of the application increases the audiences' involvement and therefore interest in the activity. Both uses of the clickers engage the audience and they become active participants rather than passive observers. Undergraduates from the University of Hawaii and Leeward Community College, and a high school student from Moanalua High School, are actively involved in the design and execution of these applications. Their input help us to anticipate areas of interest, field test ease of use, and determine areas of potential confusion. In addition, their involvement in this project is intended to increase and foster their interest in planetary science, and/or another STEM related field, while at the same time gain practical experience. The applications are designed to run

  11. Optimizing strategy software for repetitive construction projects within multi-mode resources

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-09-01

    Full Text Available Estimating tender data for specific project is the most essential part in construction areas as of contractor’s view such as: proposed project duration with corresponding gross value and cash flows. This paper focuses on how to calculate tender data using Optimizing Strategy Software (OSS for repetitive construction projects with identical activity’s duration in case of single number of crew such as: project duration, project/bid price, project maximum working capital, and project net present value of the studied project. A simplified multi-objective optimization software (OSS will be presented that creates best tender data to contractor compared with more feasible options generated from multi-mode resources in a given project. OSS is intended to give more scenarios which provide practical support for typical construction contractors who need to optimize resource utilization in order to minimize project duration, project/bid price, and project maximum working capital while maximizing its net present value simultaneously. OSS is designed by java programing code system to provide a number of new and unique capabilities, including: (1 Ranking the obtained optimal plans according to a set of planner specified weights representing the relative importance of duration, price, maximum working capital and net present value in the analyzed project; (2 Visualizing and viewing the generated optimal trade-off; and (3 Providing seamless integration with available project management calculations. In order to provide the aforementioned capabilities of OSS, the system is implemented and developed in four main modules: (1 A user interface module; (2 A database module; (3 A running module; (4 A connecting module. At the end of the paper, an illustrative example will be presented to demonstrate and verify the applications of the proposed software (OSS to an optimization expressway of repetitive construction project.

  12. MANAGING LARGE INVESTMENT PROJECTS IN GORJ

    Directory of Open Access Journals (Sweden)

    CÎRNU DORU

    2016-12-01

    Full Text Available Currently, the concept of project management is considered to be the best concept for efficient management of a project, so it is used all over the world, and most recently in our country. This concept is designed with all the general characteristics of project management, but adapted to the large investment projects. This paper presents the project management concept and project management organization for capital projects. This concept is conceived with all general characteristics of project management, but adopted to the condition of large investment projects. The concept also includes the project team and the project manager, the person authorized and responsible for achieving the objectives planned in the project. For efficient managing by project, it is necessary to insure a good compozition of project team, as a team of people who, in collaboration with project manager, work directly on managing the project. To effectively manage the project, it is necessary to ensure a proper composition of the project team, a team of people who, in collaboration with the project manager to work directly for project management. It is a particularly good method of achieving the objectives planned projects, which means a project with a certain level of performance required in a planned time, with planned costs.

  13. Working Party on International Nuclear Data Evaluation Co-operation (WPEC). Presentations and documents submitted to the 28. meeting, OECD Headquarters, Conference Centre, Paris, France, 9-13 May 2016

    International Nuclear Information System (INIS)

    2016-05-01

    The NEA's nuclear data evaluation co-operation activities involve the following evaluation projects: ENDF (United States), JENDL (Japan), ROSFOND/BROND (Russia), JEFF (other Data Bank member countries) and CENDL (China) in close co-operation with the Nuclear Data Section of the International Atomic Energy Agency (IAEA). The working party was established to promote the exchange of information on nuclear data evaluations, measurements, nuclear model calculations, validation, and related topics, and to provide a framework for co-operative activities between the participating projects. The working party assesses nuclear data improvement needs and addresses these needs by initiating joint evaluation and/or measurement efforts. The 28. Meeting of the WPEC was the occasion to review the experimental activities, the evaluation projects and the Status of subgroups. This document brings together the available documents of the meeting: 1 - The Reports on experimental activities: Europe (NEA DB), Japan, USA, China; 2 - Some Brief progress reports from the evaluation projects: ENDF, JEFF, JENDL, BROND/ROSFOND, CENDL, IAEA, TENDL; 3 - The Status of subgroups: Subgroup 37 (Improved fission product yield evaluation methodologies); Subgroup 38 (A modern nuclear database structure beyond the ENDF format); Subgroup 39 (Methods and approaches to provide feedback from nuclear and covariance data adjustment for improvement of nuclear data files); Subgroup 40 (Collaborative International Evaluated Library Organisation (CIELO) Pilot Project); Subgroup 41 (Improving nuclear data accuracy of 241 Am and 237 Np capture cross-sections); Subgroup 42 (Thermal Scattering Kernel S(a,b): Measurement, Evaluation and Application); Subgroup C (High Priority Request List - HPRL); New Subgroups were proposed and presented: 43 - Code infrastructure to support a general nuclear database structure; WPEC long-term sub-group proposal: International standard for a general nuclear database structure

  14. Improving Project Management Using Formal Models and Architectures

    Science.gov (United States)

    Kahn, Theodore; Sturken, Ian

    2011-01-01

    This talk discusses the advantages formal modeling and architecture brings to project management. These emerging technologies have both great potential and challenges for improving information available for decision-making. The presentation covers standards, tools and cultural issues needing consideration, and includes lessons learned from projects the presenters have worked on.

  15. Research Project Evaluation—Learnings from the PATHWAYS Project Experience

    Directory of Open Access Journals (Sweden)

    Aleksander Galas

    2018-05-01

    Full Text Available Background: Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project. The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project’s evaluation issues including: (1 purposes, (2 advisability, (3 tools, (4 implementation, and (5 possible benefits and presents the advantages of a continuous monitoring. Methods: Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S, Weaknesses (W, Opportunities (O, and Threats (SWOT analysis. Results: A methodology for longitudinal EU projects’ evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. Conclusions: There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  16. Teaching Engineering Students Team Work

    Science.gov (United States)

    Levi, Daniel

    1998-01-01

    The purpose of this manual is to provide professor's in engineering classes which the background necessary to use student team projects effectively. This manual describes some of the characteristics of student teams and how to use them in class. It provides a set of class activities and films which can be used to introduce and support student teams. Finally, a set of teaching modules used in freshmen, sophomore, and senior aeronautical engineering classes are presented. This manual was developed as part of a NASA sponsored project to improve the undergraduate education of aeronautical engineers. The project has helped to purchase a set of team work films which can be checked out from Cal Poly's Learning Resources Center in the Kennedy Library. Research for this project has included literature reviews on team work and cooperative learning; interviews, observations, and surveys of Cal Poly students from Industrial and Manufacturing Engineering, Aeronautical Engineering and Psychology; participation in the Aeronautical Engineering senior design lab; and interviews with engineering faculty. In addition to this faculty manual, there is a student team work manual which has been designed to help engineering students work better in teams.

  17. Earth-moving equipment as base machines in forest work. Final report of an NSR project

    Energy Technology Data Exchange (ETDEWEB)

    Johansson, Jerry [ed.

    1997-12-31

    Excavators have been used for forest draining for a long time in the Nordic countries. Only during the 1980s they were introduced as base machines for other forest operations, such as mounding, processing, harvesting, and road construction and road maintenance. Backhoe loaders were introduced in forestry at a somewhat later stage and to a smaller degree. The number of this type of base machines in forestry is so far small and is increasing very slowly. The NSR project `Earth moving equipment as base machines in forest work` started in 1993 and the project ended in 1995. The objective of the project was to obtain an overall picture of this type of machines up to a point where the logs are at landing site, ready for transportation to the industry. The project should cover as many aspects as possible. In order to obtain this picture, the main project was divided into sub projects. The sub projects separately described in this volume are (1) Excavators in ditching operations and site preparation, (2) Backhoe loaders in harvesting operations, (3) Excavators in wood cutting operations, (4) Tracked excavators in forestry operations, (5) Crawler versus wheeled base machines for single-grip harvester, and (6) Soil changes - A comparison between a wheeled and a tracked forest machine

  18. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  19. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  20. Present status of research within the International Project

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    The short report enumerates the studies which are now completed by the International Project in the Field of Food Irradiation and the studies to be continued. New feeding studies with irradiated fish, rice, spices and mangoes are performed. (MG) [de

  1. Organization of project works in Industry 4.0 digital item designing companies

    Science.gov (United States)

    Gurjanov, A. V.; Zakoldaev, D. A.; Shukalov, A. V.; Zharinov, I. O.

    2018-05-01

    The task of the project works organization in the Industry 4.0 item designing digital factories is being studied. There is a scheme of the item designing component life cycle. There is also a scheme how to develop and confirm the quality of the item designing component documentation using the mathematical modelling. There is a description of the self-organization principles for the cyber and physical technological equipment in the Industry 4.0 «smart factory» company during the manufacturing process.

  2. Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects

    Energy Technology Data Exchange (ETDEWEB)

    Sanders, Mark D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mathew, Paul [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-05-01

    This guide presents a process for three key activities for the building owner in preparing to retrofit existing commercial buildings: selecting project teams, benchmarking the existing building, and financing the retrofit work. Although there are other essential steps in the retrofit process, the three activities presented in this guide are the critical elements where the building owner has the greatest influence on the outcome of the project.

  3. WFIRST Project Science Activities

    Science.gov (United States)

    Gehrels, Neil

    2012-01-01

    The WFIRST Project is a joint effort between GSFC and JPL. The project scientists and engineers are working with the community Science Definition Team to define the requirements and initial design of the mission. The objective is to design an observatory that meets the WFIRST science goals of the Astr02010 Decadal Survey for minimum cost. This talk will be a report of recent project activities including requirements flowdown, detector array development, science simulations, mission costing and science outreach. Details of the interim mission design relevant to scientific capabilities will be presented.

  4. The GENERATE Project: Curricular and Pedagogical Inspiration from Parents and Their Children Working Together

    Science.gov (United States)

    Barnes, Jonathan

    2010-01-01

    This report summarizes GENERATE, a pilot research project conducted by 12 artists and their children 3-14. Simply put, these artist/art educator/parents allowed their own children unlimited access to their studios, materials, equipment and workspaces for two years. During that time the children were able to work alongside their parents on making…

  5. Motivation, values, and work design as drivers of participation in the R open source project for statistical computing.

    Science.gov (United States)

    Mair, Patrick; Hofmann, Eva; Gruber, Kathrin; Hatzinger, Reinhold; Zeileis, Achim; Hornik, Kurt

    2015-12-01

    One of the cornerstones of the R system for statistical computing is the multitude of packages contributed by numerous package authors. This amount of packages makes an extremely broad range of statistical techniques and other quantitative methods freely available. Thus far, no empirical study has investigated psychological factors that drive authors to participate in the R project. This article presents a study of R package authors, collecting data on different types of participation (number of packages, participation in mailing lists, participation in conferences), three psychological scales (types of motivation, psychological values, and work design characteristics), and various socio-demographic factors. The data are analyzed using item response models and subsequent generalized linear models, showing that the most important determinants for participation are a hybrid form of motivation and the social characteristics of the work design. Other factors are found to have less impact or influence only specific aspects of participation.

  6. Mothers and work-life balance: Exploring the contradictions and complexities involved in work-family negotiation

    OpenAIRE

    Wattis, Louise; Standing, Joseph; Yerkes, Mara

    2013-01-01

    textabstractThis article presents data from a project exploring women's experiences of work and care. It focuses primarily on work-life balance as a problematic concept. Social and economic transformations across advanced post-industrial economies have resulted in concerns about how individuals manage their lives across the two spheres of work and family and achieve a work-life balance. Governments across the European Union have introduced various measures to address how families effectively ...

  7. Project W-236A, work plan for preparation of a design requirements document

    International Nuclear Information System (INIS)

    Groth, B.D.

    1995-01-01

    This work plan outlines the tasks necessary, and defines the organizational responsibilities for preparing a Design Requirements Document (DRD) for project W-236A, Multi-Function Waste Tank Facility (MWTF). A DRD is a Systems Engineering document which bounds, at a high level, the requirements of a discrete system element of the Tank Waste Remediation System (TWRS) Program. This system element is usually assigned to a specific project, in this case the MWTF. The DRD is the document that connects the TWRS program requirements with the highest level projects requirements and provides the project's link to the overall TWRS mission. The MWTF DRD effort is somewhat unique in that the project is already in detailed design, whereas a DRO is normally prepared prior to preliminary design. The MWTF design effort was initiated with a Functional Design Criteria (FDC) and a Supplemental Design Requirements Document (SDRD) bounding the high level requirements. Another unique aspect of this effort is that some of the TWRS program requirements are still in development. Because of these unique aspects of the MWTF DRD development, the MWTF will be developed from existing TWRS Program requirements and project specific requirements contained in the FDC and SDRD. The following list describes the objectives of the MWTF DRD: determine the primary functions of the tanks through a functional decomposition of the TWRS Program high level functions; allocate the primary functions to a sub-system architecture for the tanks; define the fundamental design features in terms of performance requirements for the system and subsystems; identify system interfaces and design constraints; and document the results in a DRD

  8. A real CDIO mechanical engineering project in 4th semester

    DEFF Research Database (Denmark)

    Lauritsen, Aage Birkkjær

    In the past 6 years at the mechanical engineering study at the Engineering College of Aarhus we have been practicing project work on 4th Semester in the design of energy technology systems. In my presentation, I will give a description of the project, and the thoughts behind; pedagogic......-6 students, and will partly support the general theory being taught in the courses, but will also provide students with skills in teamwork, project work and system building. The pedagogical considerations behind the development of the project are quite simply that students learn best through active work...

  9. [Application of the technique of analytical structure of project for the sub-project of websites catalog of the Virtual Health Library-Nursing].

    Science.gov (United States)

    dos, Santos Luís Augusto; Marin, Heimar de Fátima; Marques, Isaac Rosa; Cunha, Isabel Cristina Kowal Olm

    2007-01-01

    This work intents, in a didactic form, to explain the benefits of use of a technique of project management, named Work Breakdown Structure: a graphical tool to identify the main results to be developed in a project. The real examples are applied to a sub-project of the Virtual Library in Health in Nursing (BVS-Enfermagem) to development of the Sites Catalogs. The benefits of graphical visualization for a major agreement between professionals of different expertise are presented.

  10. Report on the research and development work of 1984 in the project atomic fusion

    International Nuclear Information System (INIS)

    Finken, D.

    1985-02-01

    The work done by the Nuclear Research Centre in Karlsruhe on fusion under magnetic influence is compiled in the project atomic fusion and put in the programme for European Fusion Technology. The work is supported by an association contract between KfK and Euratom via the European Commission. Some of the work exceeds the volume defined in the E.E.C's technology programme. Using these papers, mostly studies, connections are established between the various fields of work and new tasks prepared. This is taking place in the light of the expected extension of the technology programme in the coming year and the plans for NET. The reports compiled here are the 1984 papers from the KfK institute. The appendix contains a compilation of the tasks undertaken by KfK from the EEC's fusion technology programme. (orig./GG) [de

  11. Dialogical communication and empowering social work practice.

    Science.gov (United States)

    Natland, Sidsel

    2015-01-01

    How to succeed in facilitating for empowering processes within social work practice is a central topic in both theoretical discussions and regarding its principles in practice. With a particular focus on how dialogical communication can play a part in order to practice empowering social work, through this text the author frames HUSK as a project facilitating the underpinning humanistic approaches in social work. Dialogical communication and its philosophical base is presented and recognized as a means to achieve empowering social work as well as highlighting the importance of the humanistic approach. The author also underscores how HUSK projects in themselves were enabled because of the required collaboration between service users, professionals, and researchers that signified HUSK. This is pinpointed as having potential for a future research agenda as well as pointing at how the outcomes of the projects may impact future social work practice when the goal is to conduct empowering social work.

  12. Project management metrics, KPIs, and dashboards a guide to measuring and monitoring project performance

    CERN Document Server

    Kerzner, Harold

    2017-01-01

    With the growth of complex projects, stakeholder involvement, and advancements in visual-based technology, metrics and KPIs (key performance indicators) are key factors in evaluating project performance. Dashboard reporting systems provide accessible project performance data, and sharing this vital data in a concise and consistent manner is a key communication responsibility of all project managers. This 3rd edition of Kerzner’s groundbreaking work includes the following updates: new sections on processing dashboard information, portfolio management PMO and metrics, and BI tool flexibility. PPT decks by chapter and a test bank will be available for use in seminar presentations and courses.

  13. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  14. Competitive interactions affect working memory performance for both simultaneous and sequential stimulus presentation

    OpenAIRE

    Ahmad, J; Swan, G; Bowman, H; Wyble, B; De Ozorio Nobre, AC; Shapiro, KL; McNab, F

    2017-01-01

    Competition between simultaneously presented visual stimuli lengthens reaction time and reduces both the BOLD response and neural firing. In contrast, conditions of sequential presentation have been assumed to be free from competition. Here we manipulated the spatial proximity of stimuli (Near versus Far conditions) to examine the effects of simultaneous and sequential competition on different measures of working memory (WM) for colour. With simultaneous presentation, the measure of WM precis...

  15. The Development of the Comic Spirit in 17th Century England from James Shirley to William Congreve. Curriculum Projects, April 7-June 16, 1992. The Huntington Theatre Company Master Works Study in Restoration Comedy.

    Science.gov (United States)

    Huntington Theatre Co., Boston, MA.

    Developed by the participants of the Huntington Theatre Company's Master Works Study in Restoration Comedy, this collection presents one-day lesson plans and curriculum projects for teaching Restoration comedy. The collection offers 15 one-day lesson plans and 15 curriculum projects (ranging over several weeks) suitable for secondary school…

  16. Presenting evidence-based health information for people with multiple sclerosis: the IN-DEEP project protocol

    Directory of Open Access Journals (Sweden)

    Hill Sophie

    2012-03-01

    Full Text Available Abstract Background Increasingly, evidence-based health information, in particular evidence from systematic reviews, is being made available to lay audiences, in addition to health professionals. Research efforts have focused on different formats for the lay presentation of health information. However, there is a paucity of data on how patients integrate evidence-based health information with other factors such as their preferences for information and experiences with information-seeking. The aim of this project is to explore how people with multiple sclerosis (MS integrate health information with their needs, experiences, preferences and values and how these factors can be incorporated into an online resource of evidence-based health information provision for people with MS and their families. Methods This project is an Australian-Italian collaboration between researchers, MS societies and people with MS. Using a four-stage mixed methods design, a model will be developed for presenting evidence-based health information on the Internet for people with MS and their families. This evidence-based health information will draw upon systematic reviews of MS interventions from The Cochrane Library. Each stage of the project will build on the last. After conducting focus groups with people with MS and their family members (Stage 1, we will develop a model for summarising and presenting Cochrane MS reviews that is integrated with supporting information to aid understanding and decision making. This will be reviewed and finalised with people with MS, family members, health professionals and MS Society staff (Stage 2, before being uploaded to the Internet and evaluated (Stages 3 and 4. Discussion This project aims to produce accessible and meaningful evidence-based health information about MS for use in the varied decision making and management situations people encounter in everyday life. It is expected that the findings will be relevant to broader

  17. Presenting evidence-based health information for people with multiple sclerosis: the IN-DEEP project protocol.

    Science.gov (United States)

    Hill, Sophie; Filippini, Graziella; Synnot, Anneliese; Summers, Michael; Beecher, Deirdre; Colombo, Cinzia; Mosconi, Paola; Battaglia, Mario A; Shapland, Sue; Osborne, Richard H; Hawkins, Melanie

    2012-03-16

    Increasingly, evidence-based health information, in particular evidence from systematic reviews, is being made available to lay audiences, in addition to health professionals. Research efforts have focused on different formats for the lay presentation of health information. However, there is a paucity of data on how patients integrate evidence-based health information with other factors such as their preferences for information and experiences with information-seeking. The aim of this project is to explore how people with multiple sclerosis (MS) integrate health information with their needs, experiences, preferences and values and how these factors can be incorporated into an online resource of evidence-based health information provision for people with MS and their families. This project is an Australian-Italian collaboration between researchers, MS societies and people with MS. Using a four-stage mixed methods design, a model will be developed for presenting evidence-based health information on the Internet for people with MS and their families. This evidence-based health information will draw upon systematic reviews of MS interventions from The Cochrane Library. Each stage of the project will build on the last. After conducting focus groups with people with MS and their family members (Stage 1), we will develop a model for summarising and presenting Cochrane MS reviews that is integrated with supporting information to aid understanding and decision making. This will be reviewed and finalised with people with MS, family members, health professionals and MS Society staff (Stage 2), before being uploaded to the Internet and evaluated (Stages 3 and 4). This project aims to produce accessible and meaningful evidence-based health information about MS for use in the varied decision making and management situations people encounter in everyday life. It is expected that the findings will be relevant to broader efforts to provide evidence-based health information for

  18. A change in strategy for a CERCLA Removal Action Demolition Project in progress results in overall project enhancements

    International Nuclear Information System (INIS)

    Albertin, M.; Nichols, R.M.; Edwards, D.T.

    1995-01-01

    This paper discusses changes made in a demolition project at the Fernald Environmental Management Project (FEMP), a site on the National Priorities list (NPL), owned by the Department of Energy. The project, to demolish fourteen uranium ore silos and their structure, was based on a Removal Action Work Plan, submitted and approved by the United States Environmental Protection Agency (USEPA), that integrated Comprehensive Environmental Response Compensation and Liability Act (CERCLA) requirements to remove the source of contamination and threat to public health and the environment. After the demolition contractor defaulted at 30% complete, completion of the project by the USEPA deadline was threatened. The recovery plan included re-evaluation of project documents in addition to the schedule. It was determined that re-interpretation of the removal action criteria, including design and Removal Action Work Plan, would eliminate road-blocks, and optimize resources, resulting in project completion by the original deadline even after lost-time in mobilizing another contractor. This presentation will discuss the open-quotes lessons learnedclose quotes by the project team and illustrate how simplification of construction methods resulted in enhancements to the environmental controls, improved material handing, and created a safer work environment

  19. AVLIS Production Plant work breakdown structure and Dictionary

    International Nuclear Information System (INIS)

    1984-01-01

    The work breakdown structure has been prepared for the AVLIS Production Plant to define, organize, and identify the work efforts and is summarized in Fig. 1-1 for the top three project levels. The work breakdown structure itself is intended to be the primary organizational tool of the AVLIS Production Plant and is consistent with the overall AVLIS Program Work Breakdown Structure. It is designed to provide a framework for definition and accounting of all of the elements that are required for the eventual design, procurement, and construction of the AVLIS Production Plant. During the present phase of the AVLIS Project, the conceptual engineering phase, the work breakdown structure is intended to be the master structure and project organizer of documents, designs, and cost estimates. As the master project organizer, the key role of the work breakdown structure is to provide the mechanism for developing completeness in AVLIS cost estimates and design development of all hardware and systems. The work breakdown structure provides the framework for tracking, on a one-to-one basis, the component design criteria, systems requirements, design concepts, design drawings, performance projections, and conceptual cost estimates. It also serves as a vehicle for contract reporting. 12 figures, 2 tables

  20. Utilizing the Project Method for Teaching Culture and Intercultural Competence

    Science.gov (United States)

    Euler, Sasha S.

    2017-01-01

    This article presents a detailed methodological outline for teaching culture through project work. It is argued that because project work makes it possible to gain transferrable and applicable knowledge and insight, it is the ideal tool for teaching culture with the aim of achieving real intercultural communicative competence (ICC). Preceding the…

  1. Temporal Compounding of Heat Waves in the Present and Projected Future

    Science.gov (United States)

    Baldwin, J. W.; Dessy, J.; Vecchi, G. A.; Oppenheimer, M.

    2017-12-01

    The hazard of heat waves is projected to increase significantly with global warming, motivating much recent research characterizing various aspects of these extreme events. One less examined aspect of heat waves is their temporal structure. Here we first modify existing heat wave duration definitions to flexibly account for a variety of possible heat wave temporal structures (sequences of hot and cooler days). We then examine past heat waves associated with high mortality using observational reanalysis data, and note that many past heat waves might be better described as series of hot days compounded together with short breaks of cooler days in between. We employ Geophysical Fluid Dynamics Laboratory (GFDL) global climate model (GCM) simulations to compare the frequency of these compound heat waves in the present and projected future with higher levels of atmospheric carbon dioxide. Our results indicate that temporally compound heatwaves will constitute a greater proportion of heat wave risk with global warming. Via examining synthetic autoregressive model data, we propose that this phenomenon is expected when shifting the mean of a time series with some memory and noise. Notably, an increased proportion of compound events implies that vulnerability from prior hot days will play an increasingly large role in heat wave risk, with possible implications for both heat wave-related policy and preparedness.

  2. Flexible working hours, health, and well-being in Europe: some considerations from a SALTSA project

    NARCIS (Netherlands)

    Costa, Giovanni; Akerstedt, Torbjorn; Nachreiner, Friedhelm; Baltieri, Federica; Carvalhais, José; Folkard, Simon; Frings-Dresen, Monique; Gadbois, Charles; Gartner, Johannes; Sukalo, Hiltraud Grzech; Härmä, Mikko; Kandolin, Irja; Sartori, Samantha; Silvério, Jorge

    2004-01-01

    The project brought together researchers from 9 EU-Countries and resulted in a number of actions, in particular the following: (a) There is an urgent need of defining the concept of flexible working hours, since it has been used in many different and even counterintuitive ways; the most obvious

  3. Implementing information systems with project teams using ethnographic-action research

    NARCIS (Netherlands)

    Hartmann, Timo; Fischer, Martin; Haymaker, John

    2009-01-01

    Architecture, engineering, and construction (AEC) projects are characterized by a large variation in requirements and work routines. Therefore, it is difficult to develop and implement information systems to support projects. To address these challenges, this paper presents a project-centric

  4. The self-created outdoor class-room "Michelbachpark": Practical experiences of 5 years project work in every-day school life

    Science.gov (United States)

    Brake, Jens; Istler, Katharina; Kisser, Thomas

    2015-04-01

    "Economy and ethos" is the guiding principle of the Evangelic Paul-Distelbarth-Gymnasia in Obersulm, located in Baden-Württemberg, Germany. Starting with class 5, the pupils have every year another project to accomplish. Since 5 years, the project in class 10 is the creation of a 1.35 hectare outdoor-class-room near the Michelbach, the "Michelbachpark". The "Michelbachpark" is a consortium project of the school, the community Obersulm, the company Cartondruck and the forestry commission office of the county Heilbronn. The focus of the project "Michelbachpark" is on several aspects of sustainable development. In the years from 2009 to 2013, there was a highlight on the ecological aspect. Since 2012, the social facet is the centre. The aim is to construct an area, which is a place for recreation and also a learning-place for people interested in nature science. Therefore the pupils designed and manufactured different experimental set-ups for younger pupils from about age 6 to 14, and some experiential education stations. Starting from 2014, the outdoor class-room is going to be combined with the use of mobile devices. Several problems aroused in the design-work: - Pupils from age 6 to 14 do not have a mobile device for certain. - The pupils maybe do not know how to handle a mobile device. - The mobile internet in the rural area may not be fast enough for about 30 pupils. - Someone has to pay for the mobile devices and the mobile internet, if it would be used. So, there is need for easily manageable mobile device and also easy manageable application, and the data should be provided without ongoing costs and with acceptable speed. Since the media plays a great part in the prize-winning curricula of the school, a set of tablets is available. The founded solution could be a blue print for other, similar outdoor education settings: The learning modules are working with QR-Codes and the data will be provided through a temporarily available local Webserver. Hence the

  5. Motivation, values, and work design as drivers of participation in the R open source project for statistical computing

    Science.gov (United States)

    Mair, Patrick; Hofmann, Eva; Gruber, Kathrin; Hatzinger, Reinhold; Zeileis, Achim; Hornik, Kurt

    2015-01-01

    One of the cornerstones of the R system for statistical computing is the multitude of packages contributed by numerous package authors. This amount of packages makes an extremely broad range of statistical techniques and other quantitative methods freely available. Thus far, no empirical study has investigated psychological factors that drive authors to participate in the R project. This article presents a study of R package authors, collecting data on different types of participation (number of packages, participation in mailing lists, participation in conferences), three psychological scales (types of motivation, psychological values, and work design characteristics), and various socio-demographic factors. The data are analyzed using item response models and subsequent generalized linear models, showing that the most important determinants for participation are a hybrid form of motivation and the social characteristics of the work design. Other factors are found to have less impact or influence only specific aspects of participation. PMID:26554005

  6. Project Kaleidoscope: Advancing What Works in Undergraduate STEM Education

    Science.gov (United States)

    Elrod, S.

    2011-12-01

    In 1989, Project Kaleidoscope (PKAL) published its first report, What Works: Building Natural Science Communities, on reforming undergraduate STEM (science, technology, engineering and mathematics) education. Since then, PKAL has grown into a national organization comprised of a diverse group of over 6500 STEM educators who are committed to advancing "what works." The PKAL mission is to be a national leader in catalyzing the efforts of people, institutions, organizations and networks to move from analysis to action in significantly improving undergraduate student learning and achievement in STEM (science, technology, engineering and mathematics). Specifically, PKAL's strategic goals are to: 1) Promote the development and wider use of evidence-based teaching, learning and assessment approaches, 2) Build individual and organizational capacity to lead change in STEM education, and 3) Engage the broader community of external stakeholders - professional and disciplinary societies, business and industry groups, accreditation organizations, educational associations, governmental agencies, philanthropic organizations - in achieving our mission. PKAL achieves these goals by serving as the nexus of an interconnected and multidisciplinary web of people, ideas, strategies, evidence and resources focused on systemic change in undergraduate STEM education. PKAL also provides resources on critical issues, such as teaching using pedagogies of engagement, and engages interested faculty, campuses and professional societies in national projects and programs focused on cutting edge issues in STEM education. One of these projects - Mobilizing Disciplinary Societies for a Sustainable Future - is engaging eleven disciplinary societies, including the National Association of Geoscience Teachers, in defining specific resources, faculty development programs and goals focused on promoting undergraduate STEM courses that: 1) provide more knowledge about real-world issues; 2) connect these real

  7. Evolution of Safeguards over Time: Past, Present, and Projected Facilities, Material, and Budget

    Energy Technology Data Exchange (ETDEWEB)

    Kollar, Lenka; Mathews, Caroline E.

    2009-07-01

    This study examines the past trends and evolution of safeguards over time and projects growth through 2030. The report documents the amount of nuclear material and facilities under safeguards from 1970 until present, along with the corresponding budget. Estimates for the future amount of facilities and material under safeguards are made according to non-nuclear-weapons states’ (NNWS) plans to build more nuclear capacity and sustain current nuclear infrastructure. Since nuclear energy is seen as a clean and economic option for base load electric power, many countries are seeking to either expand their current nuclear infrastructure, or introduce nuclear power. In order to feed new nuclear power plants and sustain existing ones, more nuclear facilities will need to be built, and thus more nuclear material will be introduced into the safeguards system. The projections in this study conclude that a zero real growth scenario for the IAEA safeguards budget will result in large resource gaps in the near future.

  8. Evolution of Safeguards over Time: Past, Present, and Projected Facilities, Material, and Budget

    International Nuclear Information System (INIS)

    Kollar, Lenka; Mathews, Caroline E.

    2009-01-01

    This study examines the past trends and evolution of safeguards over time and projects growth through 2030. The report documents the amount of nuclear material and facilities under safeguards from 1970 until present, along with the corresponding budget. Estimates for the future amount of facilities and material under safeguards are made according to non-nuclear-weapons states (NNWS) plans to build more nuclear capacity and sustain current nuclear infrastructure. Since nuclear energy is seen as a clean and economic option for base load electric power, many countries are seeking to either expand their current nuclear infrastructure, or introduce nuclear power. In order to feed new nuclear power plants and sustain existing ones, more nuclear facilities will need to be built, and thus more nuclear material will be introduced into the safeguards system. The projections in this study conclude that a zero real growth scenario for the IAEA safeguards budget will result in large resource gaps in the near future.

  9. Present status and plans of JENDL FP data evaluation project

    International Nuclear Information System (INIS)

    Kawano, Toshihiko

    2003-01-01

    The Fission Product (FP) data evaluation is one of the key issues for the next revision of JENDL, since many data were carried over from JENDL-3.2 to 3.3. The new FP Working Group (FPWG) was organized in the Japanese Nuclear Data Committee (JNDC) to perform new evaluations of FP data for JENDL. In the present review of FP data evaluation, we show the history and current status of FP nuclear data, requirements of FP data, new measurements, the international cooperation, and the future plans toward the new JENDL. (author)

  10. Working Party on International Nuclear Data Evaluation Co-operation (WPEC). Presentations and documents submitted to the 27. meeting, NEA Headquarters, 21-22 May 2015

    International Nuclear Information System (INIS)

    2015-05-01

    The NEA's nuclear data evaluation co-operation activities involve the following evaluation projects: ENDF (United States), JENDL (Japan), ROSFOND/BROND (Russia), JEFF (other Data Bank member countries) and CENDL (China) in close co-operation with the Nuclear Data Section of the International Atomic Energy Agency (IAEA). The working party was established to promote the exchange of information on nuclear data evaluations, measurements, nuclear model calculations, validation, and related topics, and to provide a framework for co-operative activities between the participating projects. The working party assesses nuclear data improvement needs and addresses these needs by initiating joint evaluation and/or measurement efforts. The 27. Meeting of the WPEC was the occasion to review the experimental activities, the evaluation projects and the Status of subgroups. This document brings together the available documents of the meeting: 1 - The Proposed agenda, the list of participants and the Summary record of the previous meeting, May 2014 (Report NEA-SEN-NSC-WPEC--2014-2); 2 - The Reports on experimental activities: Europe (NEA DB), Japan, USA, Russia, China; 3 - Some Brief progress reports from the evaluation projects: ENDF, JEFF, JENDL, BROND/ROSFOND, CENDL, IAEA, and TENDL; 4 - The Status of some subgroups: Subgroup 35 (Scattering angular distribution in the fast energy range); Subgroup 36 (Reporting and usage of experimental data for evaluation in the resolved resonance region); Subgroup 37 (Improved fission product yield evaluation methodologies); Subgroup 38 (A modern nuclear database structure beyond the ENDF format); Subgroup 39 (Methods and approaches to provide feedback from nuclear and covariance data adjustment for improvement of nuclear data files); Subgroup 40 (Collaborative International Evaluated Library Organisation (CIELO) Pilot Project); Subgroup 41 (Improving nuclear data accuracy of 241 Am and 237 Np capture cross-sections); Subgroup C (High

  11. Hanford Works monthly report, February 1953

    Energy Technology Data Exchange (ETDEWEB)

    1953-03-18

    This document presents a summary of work and progress at the Hanford Engineer Works for February 1953. The report is divided into sections by department. A plant wide general summary is included at the beginning of the report, after which the departmental summaries begin. The Manufacturing Department reports plant statistics, and summaries for the Metal Preparation, Reactor and Separation sections. The Engineering Department`s section summaries work for the Technical, Design, and Project Sections. Costs for the various departments are presented in the Financial Department`s summary. The Medical, Radiological Sciences, Utilities and General Services, Employee and Public Relations, and Community Real Estate and Service departments have sections presenting their monthly statistics, work, progress, and summaries.

  12. Hanford Works monthly report, October 1952

    Energy Technology Data Exchange (ETDEWEB)

    1952-11-20

    this document presents a summary of work and progress at the Hanford Engineer works for October 1952. The report is divided into sections by department. A plant wide general summary is included at the beginning of the report, after which the departmental summaries begin. The Manufacturing Department reports plant statistics, and summaries for the Metal Preparation, Reactor and Separation sections. The Engineering Department`s section summaries work for the Technical, Design, and Project Sections. Costs for the various departments are presented in the Financial Department`s summary. The Medical, Radiological Sciences, Utilities and General Services, Employee and Public Relations, and Community Real Estate and Services departments have sections presenting their monthly statistics, work, progress, and summaries.

  13. Hanford Works monthly report, October 1951

    Energy Technology Data Exchange (ETDEWEB)

    1951-11-21

    This document presents a summary of work and progress at the Hanford Engineer Works for October 1951. The report is divided into sections by department. A plant wide general summary is included at the beginning of the report, after which the departmental summaries begin. The Manufacturing Department reports plant statistics, and summaries for the Metal Preparation, Reactor and Separation sections. The Engineering Department`s section summarizes work for the Technical Design, and Project Sections. Costs for the various departments are presented in the Financial Department`s summary. The Medical, Radiological Sciences, Utilities and General Services, Employee and Public Relations, and Community Real Estate and Services departments have sections presenting their monthly statistics, work, progress, and summaries.

  14. Hanford Works monthly report, August 1952

    Energy Technology Data Exchange (ETDEWEB)

    1952-09-24

    This document presents a summary of work and progress at the Hanford Engineer Works for August 1952. The report is divided into sections by department. A plant wide general summary is included at the beginning of the report, after which the departmental summaries begin. The Manufacturing Department reports plant statistics, and summaries for the Metal Preparation, Reactor and Separation sections. The Engineering Department` section summaries work for the Technical, Design, and Project Sections. Costs for the various departments are presented in the Financial Department`s summary. The Medical,Radiological Sciences, Utilities and General Services, Employee and Public Relations, and Community Real Estate and Services departments have sections presenting their monthly statistics, work, progress, and summaries.

  15. Hanford Works monthly report, September 1952

    Energy Technology Data Exchange (ETDEWEB)

    1952-10-20

    This document presents a summary of work and progress at the Hanford Engineer Works for September 1952. The report is divided into sections by department. A plant wide general summary is included at the beginning of the report, after which the departmental summaries begin. The Manufacturing Department reports plant statistics, and summaries for the Metal Preparation, Reactor and Separation sections. The Engineering Department`s section summaries work for the Technical Design, and Project Sections. Costs for the various departments are presented in the Financial Department`s summary. The Medical, Radiological Sciences, Utilities and General Services, Employee and Public Relations, and Community Real Estate and Services departments have sections presenting their monthly statistics, work, progress, and summaries.

  16. Hanford Works monthly report, December 1952

    Energy Technology Data Exchange (ETDEWEB)

    1953-01-23

    This document presents a summary of work and progress at the Hanford Engineer Works for December 1952. The report is divided into sections by department. A plant wide general summary is included at the beginning of the report, after which the departmental summaries begin. The Manufacturing Department reports plant statistics, and summaries for the Metal Preparation, Reactor and Separation sections. The Engineering Department`s section summarizes work for the Technical, Design, and Project Sections. Costs for the various departments are presented in the Financial Department`s summary. The Medical, Radiological Sciences, Utilities and General Services, Employee and Public Relations, and Community Real Estate and Services departments have sections presenting their monthly statistics, work, progress, and summaries.

  17. Electron emission and work function-Past, present and future

    International Nuclear Information System (INIS)

    Yamamoto, Shigehiko

    2005-01-01

    The history of electron emission is reviewed from a standpoint of the work function and the applications. For years, in the field of thermionic emission, a great deal of efforts have been devoted to search for low work function materials with a high melting temperature, while the reduction of the local change in time of the work function rather than the work function itself has been the main issue of field emission investigations. High brightness and long life are the central targets of the emission material investigations for the scientific instrument application, while high current density and low power consumption are the guiding principles for the display application. In both fields, field emission has recently become dominant in research and development. In all above cases, the main issue in the future research works will be to analyze the work function in atomic level and thereby to understand the mechanism of the work function reduction by atom adsorption, the change in time of the local work function leading to the current fluctuation, and the relationship between microscopic and macroscopic work functions. Our attempt is discussed, where the work function in atomic level is measured by utilizing the STM technique and it is made clear how far the work function in atomic level extends its influence over the neighboring sites. As a result, a simple relationship is established between microscopic and macroscopic work functions

  18. NASA UAS Integration into the NAS Project: Human Systems Integration

    Science.gov (United States)

    Shively, Jay

    2016-01-01

    This presentation provides an overview of the work the Human Systems Integration (HSI) sub-project has done on detect and avoid (DAA) displays while working on the UAS (Unmanned Aircraft System) Integration into the NAS project. The most recent simulation on DAA interoperability with Traffic Collision Avoidance System (TCAS) is discussed in the most detail. The relationship of the work to the larger UAS community and next steps are also detailed.

  19. The Web as process tool and product environment for group-based project work in higher education

    NARCIS (Netherlands)

    Collis, Betty; Andernach, Toine; van Diepen, N.M.; Maurer, Hermann

    1996-01-01

    This paper discusses problems confronting the use of group-based project work as an instructional strategy in higher education, and describes two technical courses (i.e., courses in online learning and applications of business information technology) at the University of Twente (Netherlands) in

  20. Project-based fieldwork: perspectives of graduate entry students and project sponsors.

    Science.gov (United States)

    Fortune, Tracy; McKinstry, Carol

    2012-08-01

    This article builds on an earlier viewpoint regarding the need for project-focussed fieldwork. It presents the findings of an evaluative study into the value of project placements undertaken by final year graduate entry master's students as part of a capstone subject. The authors argue that provision of project placements enable impending graduates to develop and implement macro level strategies to develop prevention, resource and service development skills often required of contemporary occupational therapy practitioners. A qualitative approach is adopted. Student cohorts from 2005 and 2006 completed open-ended, written questionnaires, and agency project sponsors were interviewed to obtain their perspectives of the project placement experience. Despite some concern that project placements might be undertaken at the expense of 'clinical' placements these findings reveal that projects managed by students were perceived by services to add great value enabling them to advance important priorities. Students and sponsors highlighted a range of positive learning outcomes, including the ability to work collaboratively with supervisors and develop advanced communication skills and political acumen. The success of such placements depends on supportive supervision from academic staff. CONCLUSIONS AND SIGNIFICANCE OF THE STUDY: The findings promote project placements as a highly authentic aspect of work integrated learning enabling learners to draw together a range of attributes that support the ability to manage complex issues that have occupational relevance at a macro level. In addition, such experiences help learners to develop agency and political acumen both increasingly important capabilities for the contemporary workplace. © 2012 The Authors Australian Occupational Therapy Journal © 2012 Occupational Therapy Australia.

  1. Student design projects in applied acoustics.

    Science.gov (United States)

    Bös, Joachim; Moritz, Karsten; Skowronek, Adam; Thyes, Christian; Tschesche, Johannes; Hanselka, Holger

    2012-03-01

    This paper describes a series of student projects which are intended to complement theoretical education in acoustics and engineering noise control with practical experience. The projects are also intended to enhance the students' ability to work in a team, to manage a project, and to present their results. The projects are carried out in close cooperation with industrial partners so that the students can get a taste of the professional life of noise control engineers. The organization of such a project, its execution, and some of the results from the most recent student project are presented as a demonstrative example. This latest project involved the creation of noise maps of a production hall, the acoustic analysis of a packaging machine, and the acoustic analysis of a spiral vibratory conveyor. Upon completion of the analysis, students then designed, applied, and verified some simple preliminary noise reduction measures to demonstrate the potential of these techniques. © 2012 Acoustical Society of America

  2. Project Management Yinyang: Coupling project success and client satisfaction

    Directory of Open Access Journals (Sweden)

    Greg Stewart Usher

    2017-06-01

    Full Text Available Our research applies paradox theory to a project management construct to help project management researchers and practitioners understand the tensions that can exist between project success and client satisfaction. Our research highlights that although project success and client satisfaction are both present within a project management construct, they also belong to different functional systems. Project success and client satisfaction have different systemic-discourses and use different language games to convey information. These distinctions can create latent and sometimes salient tensions within the project management construct that project managers must understand, embrace, and work with. We have used a Grounded Theory (GT methodology to explore the lived experience of project managers, and from this have identified a phenomenon which we have termed project management yinyang. Project management yinyang is the state that exists when both project success and Client satisfaction are tightly coupled within the project management construct. Project management yinyang highlights that these two phenomena cannot be viewed as separate elements because the ‘seed’ of each exists within the other. And to truly achieve one, you must also achieve the other. Our findings indicate that in order to create project management yinyang the project manager must embrace a paradoxical yet holistic philosophy. They must understand the complementarity, interdependency, and structural coupling that exists between the positivist and interpretivist paradigms within the project management construct. They must understand how satisfaction (Yin and success (Yang are created through focus. Furthermore, they must understand how project management yinyang is separate from, but borne from, the convergence of the other two elements.

  3. Project Radiation protection East. Status Report, July 1997

    Energy Technology Data Exchange (ETDEWEB)

    Snihs, J.O.; Sundewall, H.; Grapengiesser, S. [STEGRA Consultants (Sweden); Bennerstedt, T. [TeknoTelje (Sweden)

    1997-12-01

    Project Radiation Protection East is a Swedish program for radiation protection work in Central and Eastern Europe. The projects are assessed, planned and performed in close cooperation with partner organizations in the East. Since 1994 radiation protection cooperation concerning the former Soviet Navy training reactors in Paldiski, Estonia, is included in the project. This report presents a summary over some 140 projects, their status, allocated funds and their distribution over countries and project areas. 12 tabs.

  4. De Sitter projective relativity

    CERN Document Server

    Licata, Ignazio; Benedetto, Elmo

    2017-01-01

    This book presents the Projective approach to de Sitter Relativity. It traces the development of renewed interest in models of the universe at constant positive curvature such as "vacuum" geometry. The De Sitter Theory of Relativity, formulated in 1917 with Willem De Sitter's solution of the Einstein equations, was used in different fields during the 1950s and 1960s, in the work of H. Bacry, J.M. LevyLeblond and F.Gursey, to name some important contributors. From the 1960s to 1980s, L. Fantappié and G. Arcidiacono provided an elegant group approach to the De Sitter universe putting the basis for special and general projective relativity. Today such suggestions flow into a unitary scenario, and this way the De Sitter Relativity is no more a "missing opportunity" (F. Dyson, 1972), but has a central role in theoretical physics. In this volume a systematic presentation is given of the De Sitter Projective relativity, with the recent developments in projective general relativity and quantum cosmology.

  5. International group heterogeneity and students’ business project achievement

    NARCIS (Netherlands)

    Ding, Ning; Bosker, Roel J.; Xu, Xiaoyan; Rugers, Lucie; van Heugten, Petra

    2015-01-01

    In business higher education, group project work plays an essential role. The purpose of the present study is to explore the relationship between the group heterogeneity of students’ business project groups and their academic achievements at both group and individual levels. The sample consists of

  6. International Group Heterogeneity and Students’ Business Project Achievement.

    NARCIS (Netherlands)

    Dr. Ning Ding; Drs. Petra van Heugten; Drs. Lucie Rugers; Dr. Roel Bosker; Dr. Xiaoyan Xu

    2015-01-01

    In business higher education, group project work plays an essential role. The purpose of the present study is to explore the relationship between the group heterogeneity of students’ business project groups and their academic achievements at both group and individual levels. The sample consists of

  7. Proposal for the award of a contract for the wood construction work for the Globe of Innovation project

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the wood construction work for the Globe of Innovation project. A call for tenders (IT-3260/ST/GIR) was sent on 31 October 2003 to twelve firms in one Member State. By the closing date, CERN had received five tenders from four firms and one consortium. The Finance Committee is invited to agree to the negotiation of a contract with CIB (CH), the lowest bidder, for the wood construction work for the Globe of Innovation project for an estimated amount not exceeding 820 000 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: CH - 100%.

  8. SELECTING WORKING TEAMS FOR INFORMATION TECHNOLOGY OUTSOURCING PROJECTS THROUGH A COMBINATION OF METHODOLOGIES

    Directory of Open Access Journals (Sweden)

    María Alejandra Castellini

    Full Text Available ABSTRACT This paper deals with a problem that Information Technology outsourcing suppliers generally face when selecting a working team technically capable for specific roles in software development projects. A combination of methodologies, interactively integrated, is proposed. They are Soft System Methodology to structure the problem, Repertory Grid for individual interviews and elicitation of the selection criteria, DRV Processes to assess the candidates and to generate knowledge and consensus on the selection process and Linear Programming to assign people to each position. This multimethodology allowed finding a more comprehensive solution than that initially requested by the company, since it helped to establish the necessary transformations for the selection model to operate in the right way, set the competencies to be considered as selection criteria, develop a consensus estimate of the weighted criteria, and award global values to candidates, optimizing the assignment of roles in the group for the project.

  9. Teaching Political Science through Memory Work

    Science.gov (United States)

    Jansson, Maria; Wendt, Maria; Ase, Cecilia

    2009-01-01

    In this article, we present the results of a research project where we have tried to elaborate more socially inclusive ways of teaching and learning political science by making use of a specific feminist method of analyzing social relations--memory work. As a method, memory work involves writing and interpreting stories of personal experience,…

  10. Shippingport station decommissioning project technology transfer program

    International Nuclear Information System (INIS)

    McKernan, M.L.

    1988-01-01

    US Department of Energy (DOE) Shippingport Station Decommissioning Project (SSDP) decommissioned, decontaminated, and dismantled the world's first, nuclear fueled, commercial size, electric power plant. SSDP programmatic goal direction for technology transfer is documentation of project management and operations experience. Objective is to provide future nuclear facility decommissioning projects with pertinent SSDP performance data for project assessment, planning, and operational implementation. This paper presents a working definition for technology transfer. Direction is provided for access and availability for SSDP technology acquisition

  11. Student-Identified Strengths and Challenges of Using Blackboard for Group Projects in a Social Work Course

    Directory of Open Access Journals (Sweden)

    Melissa B. Littlefield

    2002-05-01

    Full Text Available Blackboard (TM provides social work educators integrated online communication tools that they can employ to facilitate student learning through features such as e-mail, discussion forums, file exchange, virtual classroom, and links to online resources. This study describes students’ experiences using Blackboard (TM to support a group project assignment. The majority of students found it easy to use and useful for the project, and indicated that they would like to use it in other courses. In addition, students gained technical skills as a result of the group project. Students’ group project grades and final course grades were comparable to those in other sections of the same course taught by this investigator. The findings of this study suggest that online technology can be used to facilitate group assignments for MSW students. The benefits include increased efficiency of group functioning and increased accountability of group members. The challenges include technical problems and student resistance to using the technology.

  12. New way of working: Professionals' expectations and experiences of the Culture and Health Project for clients with psychiatric disabilities: A focus group study.

    Science.gov (United States)

    Wästberg, Birgitta A; Sandström, Boel; Gunnarsson, Anna Birgitta

    2018-02-01

    There is a need for various types of interventions when meeting needs of clients with psychiatric disabilities and complementary interventions may also influence their well-being. The Culture and Health project, based on complementary interventions with 270 clients, was created in a county in Sweden for clients with psychiatric disabilities and for professionals to carry out the interventions. The aim of this study was to investigate the professionals' expectations regarding the project and their clients' possibilities for participating, and to investigate the professionals' experiences of the project after its completion. Focus group data with a total of 30 professionals participating were collected. A qualitative content analysis revealed four categories of the professionals' expectations before entering the project: "Clients' own possibilities and limitations for their development and independence", "Professionals' possibilities for supporting the clients", "Societal prerequisites", and "Expectations of a new way of working". Furthermore, the analysis regarding professionals' experiences after working with the project revealed three categories: "Adopting the challenges", "Having ways of working that function - prerequisites and possibilities", and "Meeting the future - an ambition to continue". Working in the Culture and Health project together with the clients in group-based activities was perceived as beneficial, although challenges arose. When implementing cultural activities, support from stakeholder organisations is needed. © 2017 Australian College of Mental Health Nurses Inc.

  13. Teaching and Learning English through the Project Work. Innovative Pilot Teaching Project in the Pre-school and Primary School Pompeu Fabra, Vallirana, Barcelona. Investigation in Action comprehension in Primary Education

    Directory of Open Access Journals (Sweden)

    Verónica Asensio Arjona

    2017-12-01

    Full Text Available In order to impulse a methodology focused on the student, teachers have to establish the learning conditions that allow them to develop the experimentation, creativity, challenge and individual development. Below this framework, a Project Work of Teaching-Learning English as a foreign language is designed and applied at the state school Pompeu Fabra, Vallirana, Barcelona during the scholar year 2013-2014. The methodology of project work is chosen because it is the most appropriated methodology to achieve a learning focused on the student. It is executed an Action Research of the application of this Project in order to evaluate the competential progress of students. Quantitative and qualitative tools are used to execute the research. The quantitative tools are a standardized test and a Survey. The first one is applied in two moments, in October and in June, to evaluate the progress. The results are analyzed with Excel Tools to calculate the general average and each competence average. On the other hand, the qualitative tools that are used are: The Satisfaction and Self-perception Survey, validated by the University of Barcelona; the Teacher Diary of Observation; and an Evaluation Table for the Speaking. The triangulation of all the information show the English competence of student’s increase; as well as the interest of students in the English learning and the satisfaction in doing it also increases. Moreover, the Project Work is highly qualified by students as: the best activity to learn and enjoy it. This research obtains satisfactory results. It is a sample of innovation in teaching and learning English as a foreign language. As a result, the school decides to continue using the Project Work in the next scholar year.

  14. Critical success factors influencing the performance of development projects: An empirical study of Constituency Development Fund projects in Kenya

    OpenAIRE

    Debadyuti Das; Christopher Ngacho

    2017-01-01

    The present work attempts to identify critical success factors (CSFs) influencing the performance of development projects based on their key performance indicators (KPIs). It has considered the case of Constituency Development Fund (CDF) projects constructed between 2003 and 2011 in Kenya and secured the perceptions of 175 respondents comprising clients, consultants and contractors involved in the implementation of CDF projects on 30 success variables. Findings reveal that individual items co...

  15. Immigrants in the Working Environment

    Directory of Open Access Journals (Sweden)

    Maria Vlachadi

    2014-09-01

    Full Text Available Immigration constitutes an all time and multi-dimensional social phenomenon. There are quite a few people that in every time period seek a new place of residence and employment, in order to be able to survive or get a better life. The causes which lead to immigration are various and the immigration itself affects not only the immigrants but also the countries of departure and arrival. The immigration phenomenon has occupied and continues to occupy the majority of countries, among which is Greece which has been one of the new host countries for immigrants. The moving of the population presents when the social and economic environment in which an individual lives and moves, does not provide him with the capability to fulfill his pursuits and satisfy his ambitions. The most frequent reason of immigration nowadays is the economic factor and the objective of the individual that immigrates is finding work. In the present project we will study unemployment and employment in the host countries and more specifically in Greece. In Greece during the last years there appears to be an intense influx of immigrants converting it from a departure country to a host country for immigrants. What happens with the working conditions and insurance, how does immigration affect the unemployment of the permanent population, in what kind of jobs are immigrants occupied and do age and sex play a role in finding work? These are some of the questions we are called to answer through this project. The project not only will deal with how immigration affects the working market but also the economy in general (Cholezas and Tsakloglou, 2008. The research part of the project is based on the Greek and European Statistics Service. The statistical data are presented in the form of charts and diagrams. The data actually concern the legal immigrants in the area of Greece and countries of the E.U. (Vgenopoulos, 1988.

  16. Present and projected future mean radiant temperature for three European cities

    Science.gov (United States)

    Thorsson, Sofia; Rayner, David; Lindberg, Fredrik; Monteiro, Ana; Katzschner, Lutz; Lau, Kevin Ka-Lun; Campe, Sabrina; Katzschner, Antje; Konarska, Janina; Onomura, Shiho; Velho, Sara; Holmer, Björn

    2017-09-01

    Present-day and projected future changes in mean radiant temperature, T mrt in one northern, one mid-, and one southern European city (represented by Gothenburg, Frankfurt, and Porto), are presented, and the concept of hot spots is adopted. Air temperature, T a , increased in all cities by 2100, but changes in solar radiation due to changes in cloudiness counterbalanced or exacerbated the effects on T mrt. The number of days with high T mrt in Gothenburg was relatively unchanged at the end of the century (+1 day), whereas it more than doubled in Frankfurt and tripled in Porto. The use of street trees to reduce daytime radiant heat load was analyzed using hot spots to identify where trees could be most beneficial. Hot spots, although varying in intensity and frequency, were generally confined to near sunlit southeast-southwest facing walls, in northeast corner of courtyards, and in open spaces in all three cities. By adding trees in these spaces, the radiant heat load can be reduced, especially in spaces with no or few trees. A set of design principles for reducing the radiant heat load is outlined based on these findings and existing literature.

  17. Financing arrangements for nuclear power projects - past and present experience and future expectations

    International Nuclear Information System (INIS)

    Ispas, G.

    2004-01-01

    The intent of the author of the present paper is to demonstrate, in a practical manner, the role of the past experience and the new approaches of the nuclear projects financing, especially as nuclear generation financing in developing countries involves complex issues that need to be fully understood and dealt with by all the parties involved, namely: high investment costs, generally long construction periods, a high degree of uncertainty with respect to costs and schedule and to public acceptance, particularly because of safety, waste disposal and non-proliferation issues. Moreover, as many associations whose activities consist of ensuring and facilitating at different levels the exchange of knowledge between generations, i.e.: European Nuclear Society (ENS) Young Generation, North American Young Generation in Nuclear (NA-YGN), the goal of the paper is also to outline the importance of the education in nuclear field, i.e. training a young team of specialists to be ready to take over the movement and responsibility in continuing the further development of nuclear program in Romania, mainly with view to the Financing Arrangements for Nuclear Power Projects. The first part of the paper is referring to general financing procedures, while the second part is focusing on a case study related to the: past experience the financing scheme of Cernavoda NPP Unit 1, present or actual experience ongoing financing issues for Cernavoda NPP Unit 2 and potential future shared contribution to the financing of the next Cernavoda NPP units.(author)

  18. Vague project start makes project success of outsourced software development projects uncertain

    OpenAIRE

    Savolainen, Paula

    2010-01-01

    peer-reviewed A definition of a project success includes at least three criteria: 1) meeting planning goals, 2) customer benefits, and 3) supplier benefits. This study aims to point out the importance of the definition of the project start, the project start date, and what work should be included in the project effort in order to ensure the supplier's benefits. The ambiguity of the project start risks the profitability of the project and therefore makes project success at least from suppli...

  19. Analysis of the economic impact of environmental biosafety works projects in healthcare centres in extremadura (spain)

    OpenAIRE

    García Sanz-Calcedo, Justo; Monzón-González, Pedro

    2014-01-01

    The aim of this paper is to analyze the results obtained in the methodological application of techniques aimed at the maintenance of environmental biosafety in works of reform and expansion of healthcare centres in Extremadura, Spain during 2004-2010, assessing the costs of its implementation and contrasting if the use of a BSA project in phase of works affects the probability of nosocomial infection and the conditions of health and safety. The average investment accounted for a cost of 5.5 €...

  20. Yakima fisheries project spring chinook supplementation monitoring plan

    International Nuclear Information System (INIS)

    Busack, C.; Pearsons, T.; Knudsen, C.; Phelps, S.; Watson, B.; Johnston, M.

    1997-08-01

    The Yakima Fisheries Project (YFP), a key element in the Northwest Power Planning Council's Fish and Wildlife Program, has been in planning for more than ten years. It was initially conceived as, and is still intended to be, a multipurpose project. Besides increasing fish production in the Yakima basin, it is also intended to yield information about supplementation that will be of value to the entire Columbia basin, and hopefully the entire region. Because of this expectation of increased knowledge resulting from the project, a large and comprehensive monitoring program has always been seen as an integral part of the project. Throughout 1996 the Monitoring Implementation and Planning Team (MIPT), an interdisciplinary group of biologists who have worked on the project for several years, worked to develop a comprehensive spring chinook monitoring plan for the project. The result is the present document

  1. Promises, Premises and Risks: Sharing Responsibilities, Working Up Trust and Sustaining Commitment in Participatory Design Projects

    DEFF Research Database (Denmark)

    Büscher, Monika; Hartswood, Mark; Mogensen, Preben Holst

    2002-01-01

    While participatory design crosses the boundaries between technology production and use, it does not erase them. In accounts of participatory projects, the work of negotiating and changing these boundaries often recedes into the background, yet it is crucial in shaping the very nature and scope o...

  2. E.C.-Sarnet. Project presentation (P.P.); E.C.-Sarnet. Project presentation (P.P.)

    Energy Technology Data Exchange (ETDEWEB)

    Micaelli, J.C

    2004-07-01

    In spite of the accomplishments reached in severe accident research, a limited number of specific items remain where research activities are still necessary to reduce further uncertainties that are considered of importance for nuclear reactor safety and to consolidate severe accident management plans. facing and anticipating budget reductions, 49 European R and D organizations, including technical supports of safety authorities, industry, utilities and universities, have decided to join their efforts in S.a.r.n.e.t. in a durable way to resolve outstanding severe safety issues for enhancing the safety of existing and future nuclear power plants(NPP), S.a.r.n.e.t. will: tackle the fragmentation existing in defining or carrying out research programmes; harmonize and improve level 2 probabilistic safety analysis (P.S.A.) methodologies; diffuse the knowledge to associate candidate countries more efficiently; bring together top scientists in severe accident risk assessment. The integral severe accident analysis code A.s.t.e.c. will provide the backbone of the integration. Actions are proposed to integrate in A.s.t.e.c. the current knowledge and all the future knowledge generated within S.a.r.n.e.t.. In addition, the code will be adapted so as to be used for any water-cooled reactor applications in Europe. I.R.S.N. and G.R.S. will do their best to provide the necessary capacity for maintenance, training and developments. The network management will coordinate the knowledge generation through joint projects of research activities, monitor its integration in A.s.t.e.c., make sure that access rights are correctly implemented, disseminate appropriate information using electronic communication links, preserve the knowledge in scientific databases, and identify the missing knowledge. These actions will be decided and controlled by a Governing board assisted by appropriate advisory capacities. Most organisations involved will contribute to the diffusion of the knowledge by

  3. Implementing the theories: A fully integrated project control system that's implemented and works

    International Nuclear Information System (INIS)

    Harris, R.E.

    1994-01-01

    Using the theories presented in DOE Orders 4700.1, 1332.1A, and Notice 4700.5 as the basis for system design, the Fernald Environmental Restoration Management Corporation (FERMCO) has developed and implemented a Project Control System (PCS) that complies with requirements and provides DOE and FERMCO management with timely performance measurement information. To this extent, the FERMCO PCS probably is similar to the systems of the majority of the contractors in the DOE complex. In fact. this facet of the FERMCO PCS generally mirrors those used on projects around the world by FERMCO's parent company, Fluor Daniel. Starting with this open-quotes platformclose quotes, the vision and challenge of creating a fully integrated system commenced. An open-architecture systems approach is the factor that most greatly influenced and enabled the successful development and implementation of the Project Control System for the Fernald Environmental Management Project. All aspects of a fully integrated system were considered during the design phase. The architecture of the FERMCO system enables seamless, near real-time, transfer of data both from and to the Project Control System with all other related systems. The primary systems that provide and share data with the Project Control System include those used by the Payroll, Accounting, Procurement, and Human Resources organizations. To enable data linking with these organizations, the resource codes were designed to map many-to-one from their detailed codes to the summarized codes used in the PCS

  4. Project control of WENDELSTEIN 7-X

    International Nuclear Information System (INIS)

    Buende, R.; Gottschewsky, M.; Heinrich, S.

    2001-01-01

    WENDELSTEIN 7-X (W7-X) is an experimental stellarator presently under construction at the new branch of IPP Garching at Greifswald. Since its beginning in 1996, the project W7-X Construction has been incorporating a comprehensive project control activity to assure the plant is constructed according to schedule and budget. The working fields of the project control--organization, planning and controlling--are described together with the relevant boundary conditions of the project. The activities in these fields are highlighted and an overview of the status of the project is given with emphasis on the components on the time-critical path. As conclusions some important issues for the future of the project are specified

  5. Pointing the Way to the Future of Project Management: How the Past and Present Point Towards Project Management's Future

    National Research Council Canada - National Science Library

    Ballister, Robert

    2003-01-01

    .... The lessons learned from those projects, coupled with a look at project management history in general, will be checked against a current project management theory to determine if the focus of today's...

  6. Full-text publication of abstract-presented work in physical therapy: do therapists publish what they preach?

    Science.gov (United States)

    Smith, Heather D; Bogenschutz, Elizabeth D; Bayliss, Amy J; Altenburger, Peter A; Warden, Stuart J

    2011-02-01

    Professional meetings, such as the American Physical Therapy Association's (APTA's) Combined Sections Meeting (CSM), provide forums for sharing information relevant to physical therapy. An indicator of whether therapists fully disseminate their work is the number of full-text peer-reviewed publications that result. The purposes of this study were: (1) to determine the full-text publication rate of work presented in abstract form at CSM and (2) to investigate factors influencing this rate. A systematic search was undertaken to locate full-text publications of work presented in abstract form within the Orthopaedic and Sports Physical Therapy sections at CSM between 2000 and 2004. Eligible publications were published within 5 years following abstract presentation. The influences of APTA section, year of abstract presentation, institution of origin, study design, sample size, study significance, reporting of a funding source, and presentation type on full-text publication rate were assessed. Characteristics of full-text publications were explored. Work presented in 1 out of 4 abstracts (25.4%) progressed to full-text publication. Odds of full-text publication increased if the abstract originated from a doctorate-granting or "other" institution, reported findings of an experimental study, reported a statistically significant finding, included a larger sample size, disclosed a funding source, or was presented as a platform presentation. More than one third (37.8%) of full-text publications were published in the Journal of Orthopaedic and Sports Physical Therapy or Physical Therapy, and 4 out of 10 full-text publications (39.2%) contained at least one major change from information presented in abstract form. The full-text publication rate for information presented in abstract form within the Orthopaedic and Sports Physical Therapy sections at CSM is low relative to comparative disciplines. Caution should be exercised when translating information presented at CSM into

  7. Bruce A units 1 and 2 restart project

    International Nuclear Information System (INIS)

    Routledge, K.

    2006-01-01

    This presentation provides an overview of the Bruce A Units 1 and 2 Restart project from the vantage point of the Project Management Contractor (PMC). The presentation will highlight the unique structure of the project, which has been designed to maximize project efficiencies while minimizing the impact to the Bruce Power operational reactors. Efficiency improvements covered in the presentation includes: support services provided to the direct work contractors, radiation protection, worker protection, engineering, field execution, maintenance and facilities. The presentation focusses on the roles of the PMC in helping to ensure the successful outcome of this ambitious reactor refurbishment project. In addition, the Construction Island concept that has been implemented on the project will be presented, with some of the innovative thinking that has gone into its creation. The organization of the PMC and an overview of the project schedule is also presented. AMEC NCL is a privately held consultancy in the Canadian nuclear industry which provides experienced and flexible multi-disciplined resources to support full project management, engineering solutions and safety consultancy services throughout the life cycle of nuclear facilities in Canada, and for customers in related markets in North America and overseas. AMEC NCL is a wholly-owned subsidiary of AMEC plc

  8. Law project relative to the energy markets

    International Nuclear Information System (INIS)

    2002-01-01

    This document presents the law project relative to the energy markets. It aims to open the french gas market to the competition and defines the gas utilities obligations. The first part presents the main topics of the law: the natural gas distribution access, the natural gas sector regulation, the gas utilities, the natural gas transport and distribution, the underground storage, the control and penalties. The second part details the commission works concerning this law project. (A.L.B.)

  9. The Application of Neutron and X-Ray Techniques to Analyze Works of Art: Examples from The Unvarnished Truth Project

    Science.gov (United States)

    MacDonald, Brandi Lee

    2017-01-01

    When considered as an object, a painting consists of multiple components that, when analyzed together, have a unique story to tell about the artist, their practice, and the history of the work of art. Techniques traditionally applied in physics, including neutron-, x-radiographic and near-infrared imaging, and surface elemental analysis via x-ray fluorescence, are useful for generating significant insight into works of art. By examining the supporting material, grounds, pigments, and varnishes that a painter chose to utilize, we generate new knowledge regarding the composition, context, and decision-making involved in the creation of a work. The project `The Unvarnished Truth: exploring the material history of paintings' is an interdisciplinary initiative that incorporated the expertise of forensic art historians, conservation scientists, physicists, and biomedical engineers. Through the technical analysis of nine paintings from the McMaster Museum of Art permanent collection, we explored research questions related to painting technique, attribution, authenticity, connoisseurship, and object condition and stability. The paintings span over 500 years of European art history, and include works from Vincent Van Gogh, Alexander Rodchenko, and A. van der Neer. This project highlights the multitude of ways in which micro- and non-destructive methods can be used to answer art historical questions. This project is supported by grants from Canadian Heritage and Ontario Arts Council.

  10. Hazards of organic working fluids

    International Nuclear Information System (INIS)

    Silberstein, S.

    1977-08-01

    We present several brief reviews on working fluids proposed for use in organic Rankine and bi-phase bottoming cycles. There are several general problems with many organic working fluids: flammability, toxicity, and a tendency to leak through seals. Besides, two of the proposed working fluids are to be used at temperatures above the manufacturer's maximum recommended temperature, and one is to be used in a way different from its customary usage. It may, in some cases, be more profitable to first seek alternative working fluids before committing large amounts of time and money to research projects on unsafe working fluids

  11. National Ignition Facility Project Site Safety Program

    International Nuclear Information System (INIS)

    Dun, C

    2003-01-01

    This Safety Program for the National Ignition Facility (NIF) presents safety protocols and requirements that management and workers shall follow to assure a safe and healthful work environment during activities performed on the NIF Project site. The NIF Project Site Safety Program (NPSSP) requires that activities at the NIF Project site be performed in accordance with the ''LLNL ES and H Manual'' and the augmented set of controls and processes described in this NIF Project Site Safety Program. Specifically, this document: (1) Defines the fundamental NIF site safety philosophy. (2) Defines the areas covered by this safety program (see Appendix B). (3) Identifies management roles and responsibilities. (4) Defines core safety management processes. (5) Identifies NIF site-specific safety requirements. This NPSSP sets forth the responsibilities, requirements, rules, policies, and regulations for workers involved in work activities performed on the NIF Project site. Workers are required to implement measures to create a universal awareness that promotes safe practice at the work site and will achieve NIF management objectives in preventing accidents and illnesses. ES and H requirements are consistent with the ''LLNL ES and H Manual''. This NPSSP and implementing procedures (e.g., Management Walkabout, special work procedures, etc.,) are a comprehensive safety program that applies to NIF workers on the NIF Project site. The NIF Project site includes the B581/B681 site and support areas shown in Appendix B

  12. Saving gas project

    Energy Technology Data Exchange (ETDEWEB)

    Vasques, Maria Anunciacao S. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil); Garantizado, Maria Auxiliadora G. [CONCREMAT Engenharia, Rio de Janeiro, RJ (Brazil)

    2009-12-19

    The work presented was implemented in municipalities around the construction of the pipeline project Urucu-Coari-Manaus, the Engineering / IETEG-IENOR, because of the constant release of workers, consequently the finishing stages of this work and its future completion. The Project aims to guide saving gas with the workforce, their families and communities to the enterprise of small business cooperatives and solidarity within the potential of the site. This project is developed through the workshops: entrepreneur ship, tourism, use, reuse and recycling of products, and hortifruiti culture, agroecology, agribusiness (cooperativism solidarity) and forestry. Its execution took place in two phases, the first called 'pilot' of 12/12/2007 to 27/03/2008 in sections A and B1, in the municipality of Coari stretch and B2 in Caapiranga. The second phase occurred from 30/06 to 27/09/08, in the words B1, in the municipalities of Codajas and Anori words and B2 in Iranduba, Manacapuru and Anama. The workshops were held in state and municipal schools and administered by the Institute of Social and Environmental Amazon - ISAM, which had a team of coordinators, teachers, experts and masters of the time until the nineteen twenty-two hours to implement the project. (author)

  13. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  14. Organization of BSc and MSc projects in project families

    DEFF Research Database (Denmark)

    Ottosen, Lisbeth M.; Goltermann, Per; Jensen, Pernille Erland

    2014-01-01

    This work reports organization of student thesis projects in project families, with the benefit to both teaching and learning. The project organization went from student projects broadly distributed on topics related to different research issues and individual supervision to project families with...

  15. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  16. Using Model-Based System Engineering to Provide Artifacts for NASA Project Life-Cycle and Technical Reviews Presentation

    Science.gov (United States)

    Parrott, Edith L.; Weiland, Karen J.

    2017-01-01

    This is the presentation for the AIAA Space conference in September 2017. It highlights key information from Using Model-Based Systems Engineering to Provide Artifacts for NASA Project Life-cycle and Technical Reviews paper.

  17. Site Observational Work Plan for the UMTRA Project Site at Shiprock, New Mexico. Revision

    International Nuclear Information System (INIS)

    1995-07-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is one of the first documents for developing an approach for achieving ground water compliance at the site. This SOWP applies Shiprock site information to a regulatory compliance framework, which identifies strategies for meeting ground water compliance at the site. The compliance framework was developed in the UMTRA ground water programmatic environmental impact statement

  18. Balbina's region sustainable development project

    International Nuclear Information System (INIS)

    Hargreaves, Paul

    1994-01-01

    This work presents a planning and administration of an environmental project proposal for Balbina's lake hydroelectric power station restoration. The socio-economic objectives are the hydro-forest bio production development which include fishery, specialized tourism, leisure, besides the processing of industrial raw materials

  19. Meeting of the ITER CTA Project Board

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2001-01-01

    The meeting of the ITER CTA Project Board took place in Toronto, Canada on 7 November 2001, on the occasion of the first Negotiations Meeting. Twelve participants, representing PB members and experts from Canada, the EU, Japan, the RF and the international Team (IT), attended the meeting chaired by Acad. E. Velikhov. Discussions on the preliminary work programme for the CTA and organizational arrangements for the IT and PT took most of the time of the meeting. The Project Board approved the preliminary work programme as presented by the IT leader

  20. Presentation at Innoventure Annual Competition

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-03-31

    This report documents the components of the workshop presented at the recent annual competition for the Innoventure program. The goal of the workshop was to focus on the delivery of science, technology, engineering, and math (STEM) concepts in a hands-on experiential learning format to increase interest in national security careers at NNSA, most of which are in the STEM fields. This work is a part of the National Security Preparedness Project (NSPP), being performed under a Department of Energy (DOE)/National Nuclear Security Administration (NNSA) grant.

  1. Designing Project Management

    NARCIS (Netherlands)

    Heintz, John Linke; Lousberg, L.; Wamelink, J.W.F.; Saari, A.; Huovinen, P.

    2016-01-01

    In this paper we introduce the concept of Designing Project Management. On the basis of our earlier work, we suggest that there is still a gap between what is known from recent project management literature and what project managers can structurally help in the effectiveness of their work. Assuming

  2. Pad A Treatability Study long-range project plan

    International Nuclear Information System (INIS)

    Mousseau, J.D.

    1991-08-01

    The purpose of the Pad A Treatability Study Project is to identify and demonstrate through lab- and pilot-scale testing, technologies for treating plutonium-contaminated salt waste. This document presents proposed objectives and schedules, scope of work and breakdown structure, cost elements, deployment, benefits, and change controls for the project

  3. Presenting a Model Based on Fuzzy Application to Optimize the Time of IBS Projects in Gas Refineries

    Directory of Open Access Journals (Sweden)

    Naderpour Abbas

    2017-01-01

    Full Text Available Nowadays, the construction industry has started to embrace IBS as a method of attaining better construction quality and productivity and reducing risks related to occupational safety and health. The built of pre-fabricated component in factories reduces many problems related to lack of purposing uncertainty in scheduling calculation and time management of projects. In the case of using IBS method for managing time in projects, former studies such as Allan Tay’s research, indicates that this method can save up at least 29% of overall completion period versus the conventional method. But beside mentioned advantages of this technical method, the projects could be optimized more and more in scheduling calculations. This issue is critical in gas refineries, since special parameters such as risk of spreading poison H2S gas and mandatory of performing projects in short time period events such as maintenance overhauls demands to perform projects in optimum time. Custom scheduling calculation of project planning uses the Critical Path Method (CPM as a tool for Planning Project’s activities. The researches of this paper’s authors indicated that Fuzzy Critical Path Method (FCPM is the best technique to manage the uncertainty in project scheduling and can save up the construction project’s time versus the custom methods. This paper aims to present a model based on fuzzy application in CPM calculations to optimize the time of Industrial Building System.

  4. From the past to the future: Integrating work experience into the design process.

    Science.gov (United States)

    Bittencourt, João Marcos; Duarte, Francisco; Béguin, Pascal

    2017-01-01

    Integrating work activity issues into design process is a broadly discussed theme in ergonomics. Participation is presented as the main means for such integration. However, a late participation can limit the development of both project solutions and future work activity. This article presents the concept of construction of experience aiming at the articulated development of future activities and project solutions. It is a non-teleological approach where the initial concepts will be transformed by the experience built up throughout the design process. The method applied was a case study of an ergonomic participation during the design of a new laboratory complex for biotechnology research. Data was obtained through analysis of records in a simulation process using a Lego scale model and interviews with project participants. The simulation process allowed for developing new ways of working and generating changes in the initial design solutions, which enable workers to adopt their own developed strategies for conducting work more safely and efficiently in the future work system. Each project decision either opens or closes a window of opportunities for developing a future activity. Construction of experience in a non-teleological design process allows for understanding the consequences of project solutions for future work.

  5. Work plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    The primary objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that populations could have received from nuclear operations at the Hanford Site since 1944, with descriptions of uncertainties inherent in such estimates. The secondary objective is to make project records--information that HEDR staff members used to estimate radiation doses--available to the public. Preliminary dose estimates for a limited geographic area and time period, certain radionuclides, and certain populations are planned to be available in 1990; complete results are planned to be reported in 1993. Project reports and references used in the reports are available to the public in the DOE Public Reading Room in Richland, Washington. Project progress is documented in monthly reports, which are also available to the public in the DOE Public Reading Room.

  6. Projection: A Bibliography.

    Science.gov (United States)

    Pedrini, D. T.; Pedrini, Bonnie C.

    Sigmund Freud and his associates did much clinical work with the dynamic of projection, especially with regard to paranoid symptoms and syndromes. Much experimental work has also been done with projection. Sears evaluated the results of some of those studies. Murstein and Pryer sub-classified projection and reviewed typical studies. The…

  7. Work-based Project Overcomes Basic Skills Stigma.

    Science.gov (United States)

    Wallis, Emma

    2002-01-01

    A project to provide steel workers in North Wales with guidance about learning opportunities and to promote lifelong learning in the workplace focused on the development of basic information technology skills. (JOW)

  8. Progression in work readiness

    DEFF Research Database (Denmark)

    Jensen, Sophie Danneris

    2013-01-01

    This paper is based partly on literature concerning the construction of identities in social work settings (especially Juhila & Abrams 2011, Eskelinen & Olesen 2010) and partly on literature that addresses the dilemmas and challenges in providing evidence about the effectiveness of interventions...... in social work programs (amongst others Boaz & Blewett 2010 and Koivisto 2008). Initially there will be a short presentation of the research topic of my Ph.D. and the central research question related to the project. Following this is a methodological discussion in two levels - the first discussion...... be understood through short narratives about work identity....

  9. Infection control in design and construction work.

    Science.gov (United States)

    Collinge, William H

    2015-01-01

    To clarify how infection control requirements are represented, communicated, and understood in work interactions through the medical facility construction project life cycle. To assist project participants with effective infection control management by highlighting the nature of such requirements and presenting recommendations to aid practice. A 4-year study regarding client requirement representation and use on National Health Service construction projects in the United Kingdom provided empirical evidence of infection control requirement communication and understanding through design and construction work interactions. An analysis of construction project resources (e.g., infection control regulations and room data sheets) was combined with semi-structured interviews with hospital client employees and design and construction professionals to provide valuable insights into the management of infection control issues. Infection control requirements are representationally indistinct but also omnipresent through all phases of the construction project life cycle: Failure to recognize their nature, relevance, and significance can result in delays, stoppages, and redesign work. Construction project resources (e.g., regulatory guidance and room data sheets) can mask or obscure the meaning of infection control issues. A preemptive identification of issues combined with knowledge sharing activities among project stakeholders can enable infection control requirements to be properly understood and addressed. Such initiatives should also reference existing infection control regulatory guidance and advice. © The Author(s) 2015.

  10. Institutional Ethnography as Materialist Framework for Writing Program Research and the Faculty-Staff Work Standpoints Project

    Science.gov (United States)

    LaFrance, Michelle; Nicolas, Melissa

    2012-01-01

    Institutional ethnography seeks to uncover how things happen--how institutional discourse compels and shapes practice(s) and how norms of practice speak to, for, and over individuals. The Faculty and Staff Standpoints project is shaped by this methodology, as it explores writing center staff and faculty relationships to their work. (Contains 10…

  11. The SIMPSONS project: An integrated Mars transportation system

    Science.gov (United States)

    Kaplan, Matthew; Carlson, Eric; Bradfute, Sherie; Allen, Kent; Duvergne, Francois; Hernandez, Bert; Le, David; Nguyen, Quan; Thornhill, Brett

    In response to the Request for Proposal (RFP) for an integrated transportation system network for an advanced Martian base, Frontier Transportation Systems (FTS) presents the results of the SIMPSONS project (Systems Integration for Mars Planetary Surface Operations Networks). The following topics are included: the project background, vehicle design, future work, conclusions, management status, and cost breakdown. The project focuses solely on the surface-to-surface transportation at an advanced Martian base.

  12. Cancellation of the Kaiseraugst nuclear power plant project

    International Nuclear Information System (INIS)

    Blocher, C.; Schoenenberger, J.; Stucky, G.

    1988-01-01

    The nuclear power plant project at Kaiseraugst has been worked on for over 20 years. In 1985 the Swiss Parliament decided to license the plant. The cost of the work to date is about 1.2 x10 6 Swiss Franks. Continuation of the project is only sensible if it can be realized within a foreseeable space of time. It is probable that the discussions concerning future energy, environment and safety will continue for a long time. If this is clear that the Kaiseraugst project will not be realized during the next five to ten years for social, civic and political reasons. A continuation of the project is not justifiable. Kernkraftwerk Kaiseraugst AG must be adequately compensated. A motion has been presented to Parliament which charges the Government to negotiate with Kernkraftwerk Kaiseraugst AG for cancellation of the project

  13. Hanford analytical sample projections FY 1998 - FY 2002

    International Nuclear Information System (INIS)

    Joyce, S.M.

    1998-01-01

    Analytical Services projections are compiled for the Hanford site based on inputs from the major programs for the years 1998 through 2002. Projections are categorized by radiation level, protocol, sample matrix and program. Analyses requirements are also presented. This document summarizes the Hanford sample projections for fiscal years 1998 to 2002. Sample projections are based on inputs submitted to Analytical Services covering Environmental Restoration, Tank Waste Remediation Systems (TWRS), Solid Waste, Liquid Effluents, Spent Nuclear Fuels, Transition Projects, Site Monitoring, Industrial Hygiene, Analytical Services and miscellaneous Hanford support activities. In addition, details on laboratory scale technology (development) work, Sample Management, and Data Management activities are included. This information will be used by Hanford Analytical Services (HAS) and the Sample Management Working Group (SMWG) to assure that laboratories and resources are available and effectively utilized to meet these documented needs

  14. Hanford analytical sample projections FY 1998--FY 2002

    Energy Technology Data Exchange (ETDEWEB)

    Joyce, S.M.

    1998-02-12

    Analytical Services projections are compiled for the Hanford site based on inputs from the major programs for the years 1998 through 2002. Projections are categorized by radiation level, protocol, sample matrix and program. Analyses requirements are also presented. This document summarizes the Hanford sample projections for fiscal years 1998 to 2002. Sample projections are based on inputs submitted to Analytical Services covering Environmental Restoration, Tank Waste Remediation Systems (TWRS), Solid Waste, Liquid Effluents, Spent Nuclear Fuels, Transition Projects, Site Monitoring, Industrial Hygiene, Analytical Services and miscellaneous Hanford support activities. In addition, details on laboratory scale technology (development) work, Sample Management, and Data Management activities are included. This information will be used by Hanford Analytical Services (HAS) and the Sample Management Working Group (SMWG) to assure that laboratories and resources are available and effectively utilized to meet these documented needs.

  15. International Group Heterogeneity and Students' Business Project Achievement

    Science.gov (United States)

    Ding, Ning; Bosker, Roel J.; Xu, Xiaoyan; Rugers, Lucie; van Heugten, Petra PAM

    2015-01-01

    In business higher education, group project work plays an essential role. The purpose of the present study is to explore the relationship between the group heterogeneity of students' business project groups and their academic achievements at both group and individual levels. The sample consists of 536 freshmen from an International Business School…

  16. How the bimodal format of presentation affects working memory: an overview.

    Science.gov (United States)

    Mastroberardino, Serena; Santangelo, Valerio; Botta, Fabiano; Marucci, Francesco S; Olivetti Belardinelli, Marta

    2008-03-01

    The best format in which information that has to be recalled is presented has been investigated in several studies, which focused on the impact of bimodal stimulation on working memory performance. An enhancement of participant's performance in terms of correct recall has been repeatedly found, when bimodal formats of presentation (i.e., audiovisual) were compared to unimodal formats (i.e, either visual or auditory), in providing implications for multimedial learning. Several theoretical frameworks have been suggested in order to account for the bimodal advantage, ranging from those emphasizing early stages of processing (such as automatic alerting effects or multisensory integration processes) to those centred on late stages of processing (as postulated by the dual coding theory). The aim of this paper is to review previous contributions to this topic, providing a comprehensive theoretical framework, which is updated by the latest empirical studies.

  17. Project management a systems approach to planning, scheduling, and controlling

    CERN Document Server

    Kerzner, Harold

    2017-01-01

    Project Management is the bestselling text for students and professionals, presenting a streamlined approach to project management functions in full alignment with PMI(r)'s latest Project Management Body of Knowledge (PMBOK(r)). This new 12th edition has been updated to reflect the latest changes found in the PMBOK(r) Guide--Sixth Edition, and features new coverage of emerging topics including global stakeholder management, causes of failure, agile project management, project governance failure, customer approval milestones, classifying project metrics, and more. Supplementary materials are available for students, working professionals, and instructors. * Understand organizational structures and project management functions * Learn how to control costs, manage risk, and analyze trade-offs * Examine different methods used for planning, scheduling, QA, and more * Work effectively with customers and stakeholders from around the globe Project Management is the comprehensive reference to keep within arm's reach. ...

  18. Presentations and documents submitted to the 26. meeting, NEA Headquarters

    International Nuclear Information System (INIS)

    2014-05-01

    The NEA's nuclear data evaluation co-operation activities involve the following evaluation projects: ENDF (United States), JENDL (Japan), ROSFOND/BROND (Russia), JEFF (other Data Bank member countries) and CENDL (China) in close co-operation with the Nuclear Data Section of the International Atomic Energy Agency (IAEA). The working party was established to promote the exchange of information on nuclear data evaluations, measurements, nuclear model calculations, validation, and related topics, and to provide a framework for co-operative activities between the participating projects. The working party assesses nuclear data improvement needs and addresses these needs by initiating joint evaluation and/or measurement efforts. This document is a compilation of the available Presentations (slides) and documents (reports) submitted to the 26. WPEC meeting: Summary record of the previous meeting, May 2013; Membership and observers - May 2014 (Participation, Informal discussions on criteria defining an 'evaluation project'); 25. Anniversary of WPEC and brief overview of WPEC history; Reports on experimental activities: Europe, Japan, USA, Russia (no presentation available), China; Brief progress reports from the evaluation projects: ENDF, JEFF, JENDL, BROND/ROSFOND (no presentation available), CENDL, IAEA, TENDL; Status of subgroups: Subgroup 27: Prompt photon production from fission products (no presentation available), Subgroup 28: Processing of covariance data, Subgroup 31: Meeting nuclear data needs for advanced reactors, Subgroup 33: Methods and issues for the combined use of integral experiments and covariance data, Subgroup 34: Coordinated evaluation of Pu-239 in the resonance region, Subgroup 35: Scattering angular distribution in the fast energy range (no presentation available), Subgroup 36: Reporting and usage of experimental data for evaluation in the resolved resonance region, Subgroup 37: Improved fission product yield evaluation methodologies, Subgroup 38: A

  19. The EEE Project status and perspectives

    CERN Document Server

    Antolini, R; Baldini Ferroli, R; Bencivenni, G; Blanco, F; Bressan, E; Chiavassa, A; Cifarelli, L; Cindolo, F; Coccia, E; De Pasquale, S; Di Giovanni, A; D'Incecco, M; Fabbri, F L; Garbini, M; Gustavino, C; Hatzifotiadou, D; Imponente, G; La Rocca, P; Librizzi, F; Menghetti, H; Miozzi, S; Pappalardo,G S; Piragino, G; Riggi, F; Sartorelli, G; Sbarra, C; Selvi, M; Williams, C; Zichichi, A

    2007-01-01

    The Extreme Energy Events (EEE) project plans to build and use an array of cosmic ray telescopes for muon detection, distributed over the italian territory. The use of such telescopes, based on Multigap Resistive Plate Chambers (MRPC) will allow the study of cosmic ray showers and the correlation between multiple primaries producing distant showers. The project is also intended to involve high school teams in an advanced research work. The physics items which can be addressed by such array, and the present status and perspectives of the project are here discussed.

  20. FOSTERING AUTONOMY IN PRE-SERVICE TEACHER TRAINING THROUGH PROJECT WORK / FAVORISER L'AUTONOMIE DES FUTURS ENSEIGNANTS PAR L'INTERMÈDE DES PROJETS / ÎNCURAJAREA AUTONOMIEI IN PREGATIREA VIITORILOR PROFESORI PRIN INTERMEDIUL ACTIVITĂŢILOR DIN PROIECTE

    Directory of Open Access Journals (Sweden)

    Adriana Lazăr

    2013-11-01

    Full Text Available Developing learner autonomy during teacher training in Romania is a key matter when we talk about the student-centered approach to learning embraced by the new curricula at all levels of study. The present paper focuses on how to raise teacher trainees’ awareness of their teaching techniques during the micro-teaching sessions, through project work. We will describe an activity developed during the English as a Foreign Language Methodology Course where foreign language pre-service teachers had to prepare small-scale project work on teaching English at pre-university level. The presentation of the project work was part of their final evaluation and involved microteaching sessions: one lesson was prepared and taught by all project partners, each partner teaching a 10-15 minutes session. The Group Project could be described as follows: students got together in groups of 4 and then decided on what aspects of teaching/learning they were going to teach; they planned the lesson together and then each partner prepared his/her micro-teaching session that he/she then performed during the seminar. At the end of each teaching session, teacher trainees were asked to give self-evaluations and peer-observations on the lesson sequence which allowed them to reflect upon the teaching process. We believe that reflection resulting from self or peer observation is the key element of a good professional teacher development and makes teacher exploration possible in a plan-perform-reflect cycle. The evaluation of the Group Project was done assessing the written assignment and the overall presence and contribution of each trainee in the Group Project.

  1. Site observational work plan for the UMTRA Project Site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1996-03-01

    The U.S. Department of Energy (DOE) has prepared this initial site observational work plan (SOWP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This SOWP is one of the first UMTRA Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards (40 CFR Part 192, as amended by 60 FR 2854) for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement (PEIS). This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The DOE goal is to use the observational method to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation based on the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards

  2. Public Health Nurses in Israel: A Case Study on a Quality Improvement Project of Nurse's Work Life.

    Science.gov (United States)

    Kagan, Ilya; Shachaf, Sara; Rapaport, Zofia; Livne, Tzipi; Madjar, Batya

    2017-01-01

    Public health nurses (PHNs) working in Well Baby Clinic in Israel's Haifa district were voicing great distress to inspectors-the impossibility of meeting their workload, feeling overwhelmed, poor physical, and technological conditions. They were feeling tired and frustrated and burn-out was rising. The district's nursing management took the decision, together with Tel Aviv University's nursing research unit, to conduct a quality improvement project based on issues that arose from meetings with focus groups on the nurses' difficulties. This paper is a case study of a quality improvement project targeting nurses daily working life. One of its chief contributions is as a study of meeting PHNs' frustration by integrating focus groups and round-table brainstorming (involving nurses, clinic managers and nursing inspectors) in order to identify targets for practical intervention. This strategy has been very successful. It has provided the district's nursing management a battery of forcefully argued and realistically grounded proposals for making the work of Well Baby clinics more relevant to their communities and giving nurses (a) the conditions to meet their assignments and (b) greater professional self-respect. © 2016 Wiley Periodicals, Inc.

  3. NOAA's Coral Reef Conservation Program's 2016 Projects that Work Towards Stratefic Goals to Reduce Fishing Impacts on Coral

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — In 2016 the following projects will take place to work towards CRCP's strategic goals to reduce fishing impacts on coral reefs Building GIS Long-term Capacity:...

  4. Project Management Plan to Maintain Safe and Compliant Conditions at the Plutonium Finishing Plant

    International Nuclear Information System (INIS)

    COX, G.J.

    1999-01-01

    This Project Management Plan presents the overall plan, description, mission, and workscope for the Plutonium Finishing Plant (PFP) maintain safe and compliant conditions project at PFP. This plan presents the overall description, mission, work scope, and planning for the Plutonium Finishing Plant (PFP) Maintain Safe and Compliant Conditions Project at PFP. This project includes all tasks required to maintain the safety boundary for the PFP Complex, except for the 2736-2 Vault Complex and the 234-52 vaults and vault-type rooms. The intent of this plan is to describe how this project will be managed and integrated with the stabilization, and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines that will manage the execution of this project. It describes the organizational approach and roles/responsibilities implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action

  5. Status of project design work for a German reprocessing plant

    International Nuclear Information System (INIS)

    Lang, K.; Zuehlke, P.

    1976-01-01

    A reprocessing plant will be built within the framework of a comprehensive waste management center planned by the Federal Government to treat the fuel elements unloaded from German nuclear power stations. On the basis of an annual throughput of 1,400 te of uranium averaged over the life of the plant, the center will be able to serve between 45,000 and 50,000 MWe of installed nuclear generating capacity. A comprehensive conceptual design study of the reprocessing plant to be built has been completed on the basis of the operating experience accumulated at the Karlsruhe reprocessing plant and the development work carried out by the Karlsruhe Nuclear Research Center and in the light also of an intensive exchange of experience with British and French reprocessing companies within the framework of United Reprocessors GmbH. This conceptual design study is the foundation for the preliminary project to be carried out on a collaborative basis by KEWA and PWK. (orig.) [de

  6. Mark Bowden and Owen Sheers present "Creation" [working title]: a new musical and poetic collaborative project for chorus, soloists and orchestra

    CERN Multimedia

    2013-01-01

    "Creation" is a new collaboration between Mark Bowden, in his role as BBC National Orchestra of Wales’ Resident Composer, and the poet and novelist Owen Sheers.   Taking Haydn's 1798 work "The Creation" as a point of departure, they plan to create a new cantata for the digital age exploring the meaning of creation in the twenty-first century. Through engagement with developments in biology and physics they plan to create a new work incorporating poetry and music that will explore the latest ideas concerning the creation of matter and the emergence of life in the universe, whilst also delving into the human side of the brilliant minds that are currently working to uncover these secrets of the universe. More information is available here. Meet them at the CERN Library (bldg. 52 1-052) on Wednesday 2 October at 4 p.m. * Coffee will be served at 3.30 p.m.*

  7. South African Teacher Stories. The Past Speaks to the Present and Future

    Science.gov (United States)

    Wieder, Alan

    2004-01-01

    Since 1999 I have worked on an oral history project with teachers who fought apartheid. In this article teacher stories of the past are presented and analysed as models for societal and educational issues of the present and future. Two broad themes are addressed to connect the past to the present: (1) The importance of teachers' recollections of…

  8. Iberdrola engineering participation in the ITER project: 2005-2011

    International Nuclear Information System (INIS)

    Martinez de Miguel, G.; Hermana Mendioroz, I.

    2011-01-01

    The present paper is intended to give an overview of the work carried out by lberdrola Ingenieria y Construccion for the ITER project; These works range from the year 2005, date in which is was awarded the first contract to date.

  9. The present status of carbon 14 analysis and projects for beryllium 10 analysis at the Tandetron 1 accelerator, Nagoya University

    Energy Technology Data Exchange (ETDEWEB)

    Nakamura, Toshio; Oda, Hirotaka; Ikeda, Akiko; Niu, Etsuko [Nagoya Univ. (Japan)

    2001-02-01

    The operation experience in 1999 of the Tandetron accelerator age estimation system, Nagoya University, is reported, after the overview and the history of the accelerator is briefly described. Total number of carbon 14 environmental samples analyzed was 8567. The project of introducing new HVEE Tandetron for C-14 analysis, and modifying the present GIC Tandetron for Be-10 analysis is presented. Ion source shall be replaced, and the heavy ion detector shall be installed. Projected geological and archaeological studies using Be-10 are enumerated. (A. Yamamoto)

  10. Opposition multiple objective symbiotic organisms search (OMOSOS for time, cost, quality and work continuity tradeoff in repetitive projects

    Directory of Open Access Journals (Sweden)

    Duc-Hoc Tran

    2018-04-01

    Full Text Available Construction managers often face with projects containing multiple units wherein activities repeat from unit to unit. Therefore effective resource management is crucial in terms of project duration, cost and quality. Accordingly, researchers have developed several models to aid planners in developing practical and near-optimal schedules for repetitive projects. Despite their undeniable benefits, such models lack the ability of pure simultaneous optimization because existing methodologies optimize the schedule with respect to a single factor, to achieve minimum duration, total cost, resource work breaks or various combinations, respectively. This study introduces a novel approach called “opposition multiple objective symbiotic organisms search” (OMOSOS for scheduling repetitive projects. The proposed algorithm used an opposition-based learning technique for population initialization and for generation jumping. Further, this study integrated a scheduling module (M1 to determine all project objectives including time, cost, quality and interruption. The proposed algorithm was implemented on two application examples in order to demonstrate its capabilities in optimizing the scheduling of repetitive construction projects. The results indicate that the OMOSOS approach is a powerful optimization technique and can assist project managers in selecting appropriate plan for project. Keywords: Symbiotic organisms search, Multi-objective analysis, Resource tradeoff, Schedules, Repetitive

  11. Impacts of extended working hours in logging

    Science.gov (United States)

    Dana Mitchell; Tom Gallagher

    2008-01-01

    Last year at the 2007 AIM in Minneapolis, MN, the authors presented the human factors impacts to consider when implementing extended working hours in the logging industry. In a continuation of this project, we have researched existing literature to identify possible actions that logging business owners can take to reduce the impact of extended working hours on their...

  12. Tomography of images with poisson miose: pre-processing of projections

    International Nuclear Information System (INIS)

    Furuie, S.S.

    1989-01-01

    This work present an alternative approach in order to reconstruct images with low signal to noise ratio. Basically it consist of smoothing projections taking into account that the noise is Poisson. These filtered projections are used to reconstruct the original image, applying direct Fourier method. This approach is compared with convolution back projection and EM (Expectation-Maximization). (author) [pt

  13. OECD Halden Reactor Project

    International Nuclear Information System (INIS)

    1983-01-01

    The OECD Halden Reactor Project is both the oldest and the only one still in operation of the three major joint undertakings established at the inception of the OECD Nuclear Energy Agency. This publication has been printed in connection with its twenty-fifth anniversary as an international project. After presentation of the history and organization of the project, a thorough description of the past and present activities in the field of fuel performance and process control and surveillance is given. The projects's fuel testing programme is now focuessed on an investigation to define safety margins under normal operations as well as under various kinds of accident situations. Fuel research is also concerned with the characterisation of long term effects with regard to efficiency, operational safety and mapping of reliability and durability in the case of accidents with loss of coolant. In the field of process control and surveillance, research work is directly linked to the use of computers and colour graphics as tools in the control room. A fullscale simulator-based model and experimental control room has been constructed. The first experiments to be carried out in this laboratory will investigate the advantage of analysing alarms before they are presented to the operator. (RF)

  14. Supplement to the site observational work plan for the UMTRA project site at Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1995-11-01

    The purpose of this document is to provide additional and more detailed information to supplement review of the site observational work plan (SOWP) (DOE, 1995) for the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site. This document includes a discussion of the average linear velocity of the ground water in the alluvium and a discussion of the ground water quality of the alluvium, weathered Mancos Shale, and the Tres Hermanos-C Member of the Mancos Shale. The data from a 1989 aquifer test were analyzed using the curve-matching software AQTESOLV and then compared with the original results. A hydrograph of the ground water elevations in monitoring wells screened in the alluvium is presented to show how the ground water elevations change with time. Stiff and Piper diagrams were created to describe the changes in ground water geochemistry in the alluvium/weathered Mancos Sahel unit, the Tres Hermanos-C Sandstone unit, the Tres Hermanos-B Sandstone unit, and the Dakota Sandstone. Background information on other related topics such as site history, cell construction, soil characteristics, and well construction are presented in the SOWP. A geologic cross section depicts the conceptual model of the hydrostratigraphy and ground water chemistry of the Ambrosia Lake site. Hydrogeologic information of each hydrostratigraphic unit is presented

  15. Work Breakdown Structure (WBS) Handbook

    Science.gov (United States)

    2010-01-01

    The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements. The WBS and WBS dictionary are effective management processes for planning, organizing, and administering NASA programs and projects. The guidance contained in this document is applicable to both in-house, NASA-led effort and contracted effort. It assists management teams from both entities in fulfilling necessary responsibilities for successful accomplishment of project cost, schedule, and technical goals. Benefits resulting from the use of an effective WBS include, but are not limited to: providing a basis for assigned project responsibilities, providing a basis for project schedule development, simplifying a project by dividing the total work scope into manageable units, and providing a common reference for all project communication.

  16. New Mexico district work-effort analysis computer program

    Science.gov (United States)

    Hiss, W.L.; Trantolo, A.P.; Sparks, J.L.

    1972-01-01

    The computer program (CAN 2) described in this report is one of several related programs used in the New Mexico District cost-analysis system. The work-effort information used in these programs is accumulated and entered to the nearest hour on forms completed by each employee. Tabulating cards are punched directly from these forms after visual examinations for errors are made. Reports containing detailed work-effort data itemized by employee within each project and account and by account and project for each employee are prepared for both current-month and year-to-date periods by the CAN 2 computer program. An option allowing preparation of reports for a specified 3-month period is provided. The total number of hours worked on each account and project and a grand total of hours worked in the New Mexico District is computed and presented in a summary report for each period. Work effort not chargeable directly to individual projects or accounts is considered as overhead and can be apportioned to the individual accounts and projects on the basis of the ratio of the total hours of work effort for the individual accounts or projects to the total New Mexico District work effort at the option of the user. The hours of work performed by a particular section, such as General Investigations or Surface Water, are prorated and charged to the projects or accounts within the particular section. A number of surveillance or buffer accounts are employed to account for the hours worked on special events or on those parts of large projects or accounts that require a more detailed analysis. Any part of the New Mexico District operation can be separated and analyzed in detail by establishing an appropriate buffer account. With the exception of statements associated with word size, the computer program is written in FORTRAN IV in a relatively low and standard language level to facilitate its use on different digital computers. The program has been run only on a Control Data Corporation

  17. Critical success factors influencing the performance of development projects: An empirical study of Constituency Development Fund projects in Kenya

    Directory of Open Access Journals (Sweden)

    Debadyuti Das

    2017-12-01

    Full Text Available The present work attempts to identify critical success factors (CSFs influencing the performance of development projects based on their key performance indicators (KPIs. It has considered the case of Constituency Development Fund (CDF projects constructed between 2003 and 2011 in Kenya and secured the perceptions of 175 respondents comprising clients, consultants and contractors involved in the implementation of CDF projects on 30 success variables. Findings reveal that individual items constituting these six factors represent six CSFs namely project-related, client-related, consultant-related, contractor-related, supply chain-related, and external environment-related factor. The findings are also relevant to development projects undertaken in other developing countries.

  18. Online Project Management for Dynamic e-Collaboration

    Directory of Open Access Journals (Sweden)

    Lucia RUSU

    2010-01-01

    Full Text Available Today's collaborative projects demand efficient and productive software application tools for the workplace that will bring remote teams together to get the work done. Dynamic e-collaboration is a necessity for virtual relations and business agreements. It depends on two distinct factors: trust and need. This paper presents a way to manage remote teams using a web application developed with ColMap model of project management in an IT company. The information exposed and shared applications with partners in collaborative projects are based on RBAC. Group collaboration and management software has been proven to successfully manage and coordinate projects.

  19. Modelling in Evaluating a Working Life Project in Higher Education

    Science.gov (United States)

    Sarja, Anneli; Janhonen, Sirpa; Havukainen, Pirjo; Vesterinen, Anne

    2012-01-01

    This article describes an evaluation method based on collaboration between the higher education, a care home and university, in a R&D project. The aim of the project was to elaborate modelling as a tool of developmental evaluation for innovation and competence in project cooperation. The approach was based on activity theory. Modelling enabled a…

  20. Characteristics of the Process of Culture Development Project Activities (Culture of Social Engineering) at the Future Bachelors of Social Work

    Science.gov (United States)

    Nikitina, Natalya I.; Romanova, Elena Yu.; Vasilyeva, Tatyana V.; Nikishina, Irina N.; Grebennikova, Veronica M.

    2017-01-01

    In modern Russia professional activity productivity of social work specialist depends largely on his abilities and skills in the field of social design. University graduate's (social work bachelor`s) high level of professional-project activity culture can be regarded as one of the necessary conditions of successful labour market adaptation of…

  1. The Cognitive Behavioral Assessment (CBA Project: Presentation and Proposal for International Collaboration

    Directory of Open Access Journals (Sweden)

    Ezio Sanavio

    2013-11-01

    Full Text Available Aims: The main aim of this paper is to describe almost 30 years of work on psychological assessment using CBA, a research team, and to propose collaboration with Latin countries. Methods: The acronym CBA stands for Cognitive Behavioural Assessment and indicates both an overall approach to clinical assessment and a series of tests. Five general principles formed the basis on which the team developed their questionnaires: (1 assessment is not a passive collection of information, but an active process similar to problem-solving; (2 horizontal integration of questionnaires with other assessment methods; (3 vertical integration and hierarchical structure of assessment questionnaires; (4 idiographic perspective; (5 computer support. Results: The paper briefly presents the most important tests: CBA-2.0, a broad-spectrum Battery for patients who need counselling and/or psychotherapy; CBA-H (Hospital for both in-patients and out-patients suffering from physical illnesses; CBA-SPORT for professional athletes; CBA-Y (young people for adolescents and young adults; CBD-VE (treatment benefits to assess the effectiveness of psychological treatment. Conclusion: These questionnaires have produced over 100 research works, published in Italian journals or presented in conferences. In the near future, we expect important, radical changes and hope to create an international research milieu.

  2. Construction project investment control model based on instant information

    Institute of Scientific and Technical Information of China (English)

    WANG Xue-tong

    2006-01-01

    Change of construction conditions always influences project investment by causing the loss of construction work time and extending the duration. To resolve such problem as difficult dynamic control in work construction plan, this article presents a concept of instant optimization by ways of adjustment operation time of each working procedure to minimize investment change. Based on this concept, its mathematical model is established and a strict mathematical justification is performed. An instant optimization model takes advantage of instant information in the construction process to duly complete adjustment of construction; thus we maximize cost efficiency of project investment.

  3. Multibunch working group

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The goal of this working group was to foment discussions about the use and limitations of multi-bunch, representatives from most operating or in-project synchrotron radiation sources (ALS, SPEAR, BESSY-2, SPRING-8, ANKA, DELTA, PEP-2, DIAMOND, ESRF...) have presented their experience. The discussions have been led around 3 topics: 1) resistive wall instabilities and ion instabilities, 2) higher harmonic cavities, and 3) multibunch feedback systems.

  4. Ecological impact study methodology for hydrotechnical projects

    International Nuclear Information System (INIS)

    Manoliu, Mihai; Toculescu, Razvan

    1993-01-01

    Besides the expected benefits, hydrotechnical projects may entail unfavorable effects on the hydrological regime, environment, health and living conditions of the population. Rational water resource management should take into consideration both the favorable and unfavorable effects. This implies the assessment of socio-economic and environmental impacts of the changes of the hydrological regime. The paper proposes a methodology for carrying out impact studies of hydrotechnical projects. The results of the work are presented graphically on the basis of composite programing. A summary of mathematical methods involved in impact study design is also presented. (authors)

  5. Evaluation of Project Achievements in VOMARE -project

    OpenAIRE

    Kokkarinen, Eeva

    2011-01-01

    The purpose of the thesis is to study the achievements of VOMARE –project from the Finnish Lifeboat Institutions perspective. The organisation is a roof organisation for voluntary maritime rescue operation in Finland. The Finnish Lifeboat Institution is a lead partner in VOMARE –project which is EU funded project and the aim of the project is to start voluntary rescue operations in Estonia. The theoretical part of the work is divided into two main categories; project management and planni...

  6. CERN Summer Student Project Report – Simulation of the Micromegas Detector

    CERN Document Server

    Soares Ferreira Nunes Teixeira, Sofia Luisa

    2015-01-01

    My project during the Summer Student Programme at CERN consisted on simulations of the Micromegas (MM) detectors in order to test and characterize them in the presence of contamination by air of the gas mixture. The MM detectors were chosen for the upcoming upgrade of the ATLAS detector. The motivation for this project and the results obtained are here presented. Moreover, the work that should be carried out after this programme as a continuation of this project is also referred. To conclude, final considerations about the project are presented.

  7. Initial comments on the aero geophysical information present at the B and C areas of the Itatira (Brazil) project

    International Nuclear Information System (INIS)

    Castro, Neivaldo Araujo de; Castelo Branco, Raimundo Mariano Gomes

    1999-01-01

    The aero geophysical project called Itatira,, accomplished by LASA Engenharia e Prospeccoes S.A., Between September and November/1977 through contract with NUCLEBRAS, corresponds to one of the first project of this gender accomplished in national territory. In this project were flight more than 80 000 km of linear lines, which covered approximately 38 000 km 2 on the precambrian terrains of the Ceara State, NE Brazil. For several reasons, the total area of the project was subdivided in three sub-areas (A, B and C), each one covered by a different airship (LAS, 1977). This paper presents the geophysical information and preliminary interpretations of the areas B and C that were obtained through the integrated use of the soft wares AUTOCAD r. 14, OASIS MONTAJ r.4.2 and ERMAPPER r.5.5. (author)

  8. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  9. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project FY17 Annual Review

    Science.gov (United States)

    Sakahara, Robert; Hackenberg, Davis; Johnson, William

    2017-01-01

    This presentation was presented to the Integrated Aviation Systems Program at the FY17 Annual Review of the UAS-NAS project. The presentation captures the overview of the work completed by the UAS-NAS project and its subprojects.

  10. Publication list concerning LMFBR-work of KFK from 1976 until 1978

    International Nuclear Information System (INIS)

    Hueper, R.

    1979-04-01

    This list is a continuation of the lists of the Karlsruhe Fast Breeder Project publications given in the earlier reports KFK-Ext. 25/7-1 and 25/76-1. Corresponding to the present organisation of the project in the framework of the cooperation between Germany, Belgium, the Netherlands and France, the list is subdivided into the fields of the working groups of the 'Arbeitsausschuss F+E-Programme des SNR-300'. In the last part of the list general surveys of the project work and its objectives are quoted. (orig.) [de

  11. The influence of social style in evaluating academic presentations of engineering projects

    Directory of Open Access Journals (Sweden)

    Hector Ortiz

    2012-09-01

    Full Text Available An individual’s social style is determined by behavioral patterns in the interactions with their peers. Some studies suggest that social style may influence the way in which an individual’s performance is evaluated. We studied the effects that speakers’ and evaluators’ social styles have on the marks given for end-of-term presentations in a project engineering master’s course. The participants completed a self-evaluation exercise that classified their social styles into one of four categories: Driver, expressive, analytical, or amiable. Students individually rated the content and appearance of their classmates’ presentations. A statistical analysis of these scores revealed that the speaker’s social style had a significant effect on the marks received for content and appearance. The evaluator’s social style also demonstrated a statistically significant effect on the marks given for appearance, though not for content. Students with expressive social style received the highest scores, while the analytical style received the lowest scores. These results reiterate the necessity to train students as evaluators in order to reduce bias when evaluating their classmates and co-workers during their academic and professional careers.

  12. Physics from angular projection of rectangular grids

    International Nuclear Information System (INIS)

    Singh, Ashmeet

    2015-01-01

    In this paper, we present a mathematical model for the angular projection of a rectangular arrangement of points in a grid. This simple yet interesting, problem has both scholarly value and applications for data extraction techniques to study the physics of various systems. Our work may help undergraduate students to understand subtle points in the angular projection of a grid and describes various quantities of interest in the projection with completeness and sufficient rigour. We show that for certain angular ranges, the projection has non-distinctness, and calculate the details of such angles, and correspondingly, the number of distinct points and the total projected length. We focus on interesting trends obtained for the projected length of the grid elements and present a simple application of the model to determine the geometry of an unknown grid whose spatial extensions are known, using measurement of the grid projection at two angles only. Towards the end, our model is shown to have potential applications in various branches of physical sciences, including crystallography, astrophysics, and bulk properties of materials. (paper)

  13. Equation of State Project Overview

    Energy Technology Data Exchange (ETDEWEB)

    Crockett, Scott [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-09-11

    A general overview of the Equation of State (EOS) Project will be presented. The goal is to provide the audience with an introduction of what our more advanced methods entail (DFT, QMD, etc.. ) and how these models are being utilized to better constrain the thermodynamic models. These models substantially reduce our regions of interpolation between the various thermodynamic limits. I will also present a variety example of recent EOS work.

  14. A Framework of Combining Case-Based Reasoning with a Work Breakdown Structure for Estimating the Cost of Online Course Production Projects

    Science.gov (United States)

    He, Wu

    2014-01-01

    Currently, a work breakdown structure (WBS) approach is used as the most common cost estimation approach for online course production projects. To improve the practice of cost estimation, this paper proposes a novel framework to estimate the cost for online course production projects using a case-based reasoning (CBR) technique and a WBS. A…

  15. Resource Roads demonstration project : final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-07-15

    British Columbia's vast network of resource roads are considered to be amongst the most dangerous, high-risk workplaces in the province. Resource roads, also known as industrial roads, forest service roads, or petroleum development roads, present several unique safety challenges as workplaces. They are built for the purpose of access, egress and transport of materials, resources, equipment and people. However, the lack the same diligence of enforcement and a consistent design, construction, maintenance and standard for use as public highways or municipal roads. There are also safety challenges related to public use of resource roads. This report presented a project, called ResourceRoads by WorkSafe BC that focused on the organization and implementation of a management structure that would provide a system of coordination and a process of compliance for the users of the defined road systems. The project was based on information gathered in two forest districts of Prince George and the South Peace Forest Districts. A committee consisting of the actual owner of the road and other users was formed. The report presented a history of British Columbia's resource road system, and discussed resource roads as industrial workplaces and worksites, as well as resource road fatality statistics. The demonstration project was outlined in terms of project leadership; scope; strategic objectives; project purpose; performance objectives; project communication; demonstration areas; and project stages. Project fundamentals and project findings were also presented along with recommendations and responses to the Auditor General report and the Forest Safety Ombudsman report. It was concluded that potential uses of new technologies for resource road vehicles should be reviewed. tabs., figs.

  16. Group monopolization & collaborative work: the making of a science video project

    NARCIS (Netherlands)

    Jayme, B.; Roth, W.-M.; Reis, G.; Eijck, van M.W.

    2007-01-01

    ABSTRACT: In the present ethnographic case study, we investigate how monopolization emerges and is maintained during collaborative working situations in elementary science classroom tasks. Our analysis suggests that monopolization is achieved in part by the position of the students around the

  17. The international hydrocoin project

    International Nuclear Information System (INIS)

    1987-01-01

    The International HYDROCOIN (Hydrologic Code Intercomparison) Project was started in May 1984. Fourteen organizations participate in the Project, with the Swedish Nuclear Power Inspectorate (SKI) as managing participant and the OECD Nuclear Energy Agency (NEA) taking part as a member of the Project secretariat. HYDROCOIN is concerned with the assessment of groundwater movements at potential nuclear waste disposal sites with the help of mathematical models and computer codes. The Project is divided into three levels. The objective of HYDROCOIN Level 1 is to verify the accuracy of groundwater flow codes. HYDROCOIN Level 2 and Level 3 are concerned with validation of hydrological models and uncertainty/sensitivity analysis, respectively. This report, which has been prepared by the NEA Secretariat and SKI in consultation with the co-ordinating group of the HYDROCOIN Project summarizes the background and objectives of the Project and presents the results of the work performed up to the middle of 1987. It is intended to provide general information on HYDROCOIN to interested parties beyond the group of directly involved specialists

  18. Tackling the work-life balance challenge in Professional Service Firms: the impact of projects, organizing and service characteristics

    NARCIS (Netherlands)

    Noury, L.C.; Gand, Sébastien; Sardas, Jean-Claude

    2017-01-01

    Professional Service Firms (PSFs) are currently under considerable pressure for economic reasons (low growth, pressure on cost), but also from the emergence of individual demands for work-life balance (WLB) from professionals, which challenge traditional ways of organizing both projects and careers.

  19. Neural network algorithm for image reconstruction using the grid friendly projections

    International Nuclear Information System (INIS)

    Cierniak, R.

    2011-01-01

    Full text: The presented paper describes a development of original approach to the reconstruction problem using a recurrent neural network. Particularly, the 'grid-friendly' angles of performed projections are selected according to the discrete Radon transform (DRT) concept to decrease the number of projections required. The methodology of our approach is consistent with analytical reconstruction algorithms. Reconstruction problem is reformulated in our approach to optimization problem. This problem is solved in present concept using method based on the maximum likelihood methodology. The reconstruction algorithm proposed in this work is consequently adapted for more practical discrete fan beam projections. Computer simulation results show that the neural network reconstruction algorithm designed to work in this way improves obtained results and outperforms conventional methods in reconstructed image quality. (author)

  20. Multi-Modal presentation of Works of Art in Virtual Reality with Simulation of Multi-Mirror Reflections

    DEFF Research Database (Denmark)

    Livatino, Salvatore

    2006-01-01

    The use of different media such as photography and virtual reality combined with different presentation modalities may provide a user with an extraordinary tool for exploration and appreciation of real work of art. This is especially important in case of time-spatial works-of-art where the problem...

  1. Adapt! – Agile Project Management Supported by Axiomatic Design

    Directory of Open Access Journals (Sweden)

    Weber Jakob

    2017-01-01

    Full Text Available This paper presents a novel approach for the use of Axiomatic Design Theory in combination with agile project management methods like Scrum for an effective, structured and combined product design and development process. Agile project management methods give a guideline how to manage a project, but there is only minor assistance regarding the actual product development process itself. Axiomatic Design can be used to support these methods in this point. In concrete terms, the results of the decomposition process of this theory can be used to formulate and structure the work packages for the agile project managing process. The Independence Axiom of Axiomatic Design Theory has a substantial contribution by ensuring the independence of the work packages which can be assigned to different project team members and can be processed independently by them. The combination of the different methods not only helps to ensure a good design solution but also helps to work more agile within a project team. The here proposed approach is one part of a holistic product design and development process for changeable production units – called Adapt! – and is described within a use case in the automotive sector.

  2. Competitive interactions affect working memory performance for both simultaneous and sequential stimulus presentation.

    Science.gov (United States)

    Ahmad, Jumana; Swan, Garrett; Bowman, Howard; Wyble, Brad; Nobre, Anna C; Shapiro, Kimron L; McNab, Fiona

    2017-07-06

    Competition between simultaneously presented visual stimuli lengthens reaction time and reduces both the BOLD response and neural firing. In contrast, conditions of sequential presentation have been assumed to be free from competition. Here we manipulated the spatial proximity of stimuli (Near versus Far conditions) to examine the effects of simultaneous and sequential competition on different measures of working memory (WM) for colour. With simultaneous presentation, the measure of WM precision was significantly lower for Near items, and participants reported the colour of the wrong item more often. These effects were preserved when the second stimulus immediately followed the first, disappeared when they were separated by 500 ms, and were partly recovered (evident for our measure of mis-binding but not WM precision) when the task was altered to encourage participants to maintain the sequentially presented items together in WM. Our results show, for the first time, that competition affects the measure of WM precision, and challenge the assumption that sequential presentation removes competition.

  3. Project and feedback experience on nuclear facility decommissioning

    Energy Technology Data Exchange (ETDEWEB)

    Santiago, J.L. [ENRESA (Spain); Benest, T.G. [United Kingdom Atomic Energy Authority, Windscale, Cumbria (United Kingdom); Tardy, F.; Lefevre, Ph. [Electricite de France (EDF/CIDEN), 69 - Villeurbanne (France); Willis, A. [VT Nuclear Services (United Kingdom); Gilis, R.; Lewandowski, P.; Ooms, B.; Reusen, N.; Van Laer, W.; Walthery, R. [Belgoprocess (Belgium); Jeanjacques, M. [CEA Saclay, 91 - Gif sur Yvette (France); Bohar, M.P.; Bremond, M.P.; Poyau, C.; Mandard, L.; Boissonneau, J.F.; Fouquereau, A.; Pichereau, E.; Binet, C. [CEA Fontenay aux Roses, 92 (France); Fontana, Ph.; Fraize, G. [CEA Marcoule 30 (France); Seurat, Ph. [AREVA NC, 75 - Paris (France); Chesnokov, A.V.; Fadin, S.Y.; Ivanov, O.P.; Kolyadin, V.I.; Lemus, A.V.; Pavlenko, V.I.; Semenov, S.G.; Shisha, A.D.; Volkov, V.G.; Zverkov, Y.A. [Russian Research Centre Kurchatov Inst., Moscow (Russian Federation)

    2008-11-15

    This series of 6 short articles presents the feedback experience that has been drawn from various nuclear facility dismantling and presents 3 decommissioning projects: first, the WAGR project that is the UK demonstration project for power reactor decommissioning (a review of the tools used to dismantle the reactor core); secondly, the dismantling project of the Bugey-1 UNGG reactor for which the dismantling works of the reactor internals is planned to be done underwater; and thirdly, the decommissioning project of the MR reactor in the Kurchatov Institute. The feedback experience described concerns nuclear facilities in Spain (Vandellos-1 and the CIEMAT research center), in Belgium (the Eurochemic reprocessing plant), and in France (the decommissioning of nuclear premises inside the Fontenay-aux-roses Cea center and the decommissioning of the UP1 spent fuel reprocessing plant at the Marcoule site). (A.C.)

  4. Project and feedback experience on nuclear facility decommissioning

    International Nuclear Information System (INIS)

    Santiago, J.L.; Benest, T.G.; Tardy, F.; Lefevre, Ph.; Willis, A.; Gilis, R.; Lewandowski, P.; Ooms, B.; Reusen, N.; Van Laer, W.; Walthery, R.; Jeanjacques, M.; Bohar, M.P.; Bremond, M.P.; Poyau, C.; Mandard, L.; Boissonneau, J.F.; Fouquereau, A.; Pichereau, E.; Binet, C.; Fontana, Ph.; Fraize, G.; Seurat, Ph.; Chesnokov, A.V.; Fadin, S.Y.; Ivanov, O.P.; Kolyadin, V.I.; Lemus, A.V.; Pavlenko, V.I.; Semenov, S.G.; Shisha, A.D.; Volkov, V.G.; Zverkov, Y.A.

    2008-01-01

    This series of 6 short articles presents the feedback experience that has been drawn from various nuclear facility dismantling and presents 3 decommissioning projects: first, the WAGR project that is the UK demonstration project for power reactor decommissioning (a review of the tools used to dismantle the reactor core); secondly, the dismantling project of the Bugey-1 UNGG reactor for which the dismantling works of the reactor internals is planned to be done underwater; and thirdly, the decommissioning project of the MR reactor in the Kurchatov Institute. The feedback experience described concerns nuclear facilities in Spain (Vandellos-1 and the CIEMAT research center), in Belgium (the Eurochemic reprocessing plant), and in France (the decommissioning of nuclear premises inside the Fontenay-aux-roses Cea center and the decommissioning of the UP1 spent fuel reprocessing plant at the Marcoule site). (A.C.)

  5. Management of Teacher Scientific-Methodical Work in Vocational Educational Institutions on the Basis of Project-Target Approach

    Science.gov (United States)

    Shakuto, Elena A.; Dorozhkin, Evgenij M.; Kozlova, Anastasia A.

    2016-01-01

    The relevance of the subject under analysis is determined by the lack of theoretical development of the problem of management of teacher scientific-methodical work in vocational educational institutions based upon innovative approaches in the framework of project paradigm. The purpose of the article is to develop and test a science-based…

  6. The Grammar Movie Project

    Science.gov (United States)

    Kreutner, Edith

    2015-01-01

    In this case study, I will show how directing a movie on grammar can help students improve their oral skills as well as their language competency, team working and planning skills, and also teach them about learning itself. I will present an innovative teaching project that uses the medium of film to get students engaged with grammar and that aims…

  7. Present status of EURODIF project

    International Nuclear Information System (INIS)

    Rougeau, J.P.

    1977-01-01

    Since 1953, in France, the Commissariat a' l'Energie Atomique (CEA) has studied and developed the gaseous diffusion process. EURODIF was formed as a joint venture to perform a feasibility study based on research and development carried out by CEA and on engineering and cost data put together by USSI. EURODIF, backed by the governments of Belgium, France, Italy, and Spain decided to start a plant in late 1981 to be located in France in the Tricastin district of the Rhone Valley. The general layout of the gaseous diffusion plant included the four process buildings, the buildings where UF 6 products are received and delivered, the central control room, the switchyard, the cooling towers, the surface coating workshop, and ancillary units and various workshops. Firm sales cover the whole production until 1990, nearly 90% of which is being made to the shareholders. Customers were found in Japan, Switzerland, and the Federal Republic of Germany. COREDIF, Compagnie de Realisation d'Usines de Diffusion Gazeuse, was incorporated in 1975 to build in Europe a second enrichment plant using gaseous diffusion. The EURODIF/COREDIF complex, with a production capacity of more than 20 million separative work units per year, is one the the most important private suppliers of enrichment services. Contracts are proposed that are flexible enough to meet the requirements of each electricity producer

  8. Fast Breeder Project status report, 1974

    International Nuclear Information System (INIS)

    Hueper, R.

    A compilation of the papers read at the Status Report of the Fast Breeder Project at the Karlsruhe Nuclear Research Center on March 26, 1974 is presented. The first papers present a general survey of the present state of research and development work performed by the German, Belgian, and Netherlands research centers on the SNR 300 Prototype Fast Breeder Reactor (Kalkar Nuclear Power Station), on the SNR follow-on program, alternative fuels and coolants and basic problems, on work performed by industry with respect to the licensing procedure and construction of the SNR 300, and on commissioning and the planned conversion of KNK, the Compact Sodium Cooled Nuclear Reactor. The detailed papers deal with results elaborated at the institutes of GfK Karlsruhe, SCK/CEN Mol, RCN Petten, and TNO Apeldoorn. Most of these efforts have been concentrated upon fuel pin and materials development and on the physics and safety of fast reactors. The status report concludes with a reference to the future program under the Project. (U.S.)

  9. Identification of promising Twin Hub networks : Report of Work Package 1 of the Intermodal rail freight Twin hub Network Northwest Europe - project (final report)

    NARCIS (Netherlands)

    Kreutzberger, E.D.; Konings, J.W.; Meijer, S.; Witteveen, C.; Meijers, B.M.; Pekin, E.; Macharis, C.; Kiel, J.; Kawabata, Y.; Vos, W.

    2014-01-01

    This report is the first deliverable of the project Intermodal Rail Freight Twin Hub Network Northwest Europe. We call its subject Twin hub network and the organisational entity to carry out the actions the Twin hub project. The project is funded by INTERREG NWE (programme IVb). Its work started in

  10. Differences between Presentation Methods in Working Memory Procedures: A Matter of Working Memory Consolidation

    Science.gov (United States)

    Ricker, Timothy J.; Cowan, Nelson

    2014-01-01

    Understanding forgetting from working memory, the memory used in ongoing cognitive processing, is critical to understanding human cognition. In the past decade, a number of conflicting findings have been reported regarding the role of time in forgetting from working memory. This has led to a debate concerning whether longer retention intervals…

  11. A Statistical Project Control Tool for Engineering Managers

    Science.gov (United States)

    Bauch, Garland T.

    2001-01-01

    This slide presentation reviews the use of a Statistical Project Control Tool (SPCT) for managing engineering projects. A literature review pointed to a definition of project success, (i.e., A project is successful when the cost, schedule, technical performance, and quality satisfy the customer.) The literature review also pointed to project success factors, and traditional project control tools, and performance measures that are detailed in the report. The essential problem is that with resources becoming more limited, and an increasing number or projects, project failure is increasing, there is a limitation of existing methods and systematic methods are required. The objective of the work is to provide a new statistical project control tool for project managers. Graphs using the SPCT method plotting results of 3 successful projects and 3 failed projects are reviewed, with success and failure being defined by the owner.

  12. Proposed purchasing, employment and training policies for northern projects

    International Nuclear Information System (INIS)

    1991-09-01

    Manitoba Hydro is about to embark on a major construction project in the northern part of the province. Important considerations involved in this project include purchasing the necessary materials, products, and services, and employing a suitable work force. An outline is presented of draft policies being considered by Manitoba Hydro to enhance northern-aboriginal and northern participation in its future development projects in northern Manitoba. The policies are presented in four sections: purchasing for northern construction and operation activities; training and employment for construction of a generation station and expansion of a converter station; training and employment for construction of a major north-south transmission line; and training and employment for northern operations and maintenance work at existing facilities. Aspects of these policies include giving preference in purchasing to northern and aboriginal businesses, training initiatives and employee counselling for aboriginal employees, and hiring preferences directed toward northern aboriginals and northern residents

  13. Project THEMIS: A Center for Remote Sensing.

    Science.gov (United States)

    This report summarizes the technical work accomplished under Project THEMIS, A Center for Remote Sensing at the University of Kansas during the...period 16 September 1967 through 15 September 1973. The highlights of the four major areas forming the remote sensing system are presented. A detailed description of the latest radar spectrometer results is presented.

  14. [Implementing population-based integrated care for a region: a work-in-progress report on the project "Gesundes Kinzigtal"].

    Science.gov (United States)

    Hildebrandt, Helmut; Schmitt, Gwendolyn; Roth, Monika; Stunder, Brigitte

    2011-01-01

    The regional integrated care model "Gesundes Kinzigtal" pursues the idea of integrated health care with special focus on increasing the health gain of the served population. Physicians (general practitioners) and psychotherapists, physiotherapists, hospitals, nursing services, non-profit associations, fitness centers, and health insurance companies work closely together with a regional management company and its programs on prevention and care coordination and enhancement. The 10 year-project is run by a company that was founded by the physician network "MQNK" and "OptiMedis AG", a corporation with public health background specialising in integrated health care. The aim of this project is to enhance prevention and quality of health care for a whole region in a sustainable way, and to decrease costs of care. The article describes the special funding model of the project, the engagement of patients, and the different health and prevention programmes. The programmes and projects are developed, implemented, and evaluated by multidisciplinary teams. Copyright © 2011. Published by Elsevier GmbH.

  15. Projected coupled cluster theory.

    Science.gov (United States)

    Qiu, Yiheng; Henderson, Thomas M; Zhao, Jinmo; Scuseria, Gustavo E

    2017-08-14

    Coupled cluster theory is the method of choice for weakly correlated systems. But in the strongly correlated regime, it faces a symmetry dilemma, where it either completely fails to describe the system or has to artificially break certain symmetries. On the other hand, projected Hartree-Fock theory captures the essential physics of many kinds of strong correlations via symmetry breaking and restoration. In this work, we combine and try to retain the merits of these two methods by applying symmetry projection to broken symmetry coupled cluster wave functions. The non-orthogonal nature of states resulting from the application of symmetry projection operators furnishes particle-hole excitations to all orders, thus creating an obstacle for the exact evaluation of overlaps. Here we provide a solution via a disentanglement framework theory that can be approximated rigorously and systematically. Results of projected coupled cluster theory are presented for molecules and the Hubbard model, showing that spin projection significantly improves unrestricted coupled cluster theory while restoring good quantum numbers. The energy of projected coupled cluster theory reduces to the unprojected one in the thermodynamic limit, albeit at a much slower rate than projected Hartree-Fock.

  16. Tri-State Synfuels Project Review: Volume 12. Fluor project status. [Proposed Henderson, Kentucky coal to gasoline plant; engineering

    Energy Technology Data Exchange (ETDEWEB)

    1982-06-01

    The purpose of this report is to document and summarize activities associated with Fluor's efforts on the Tri-State Synfuels Project. The proposed facility was to be coal-to-transport fuels facility located in Henderson, Kentucky. Tri-State Synfuels Company was participating in the project as a partner of the US Department of Energy per terms of a Cooperative Agreement resulting from DOE's synfuel's program solicitation. Fluor's initial work plan called for preliminary engineering and procurement services to the point of commitment for construction for a Sasol Fischer-Tropsch plant. Work proceeded as planned until October 1981 when results of alternative coal-to-methanol studies revealed the economic disadvantage of the Synthol design for US markets. A number of alternative process studies followed to determine the best process configuration. In January 1982 Tri-State officially announced a change from Synthol to a Methanol to Gasoline (MTG) design basis. Further evaluation and cost estimates for the MTG facility eventually led to the conclusion that, given the depressed economic outlook for alternative fuels development, the project should be terminated. Official announcement of cancellation was made on April 13, 1982. At the time of project cancellation, Fluor had completed significant portions of the preliminary engineering effort. Included in this report are descriptions and summaries of Fluor's work during this project. In addition location of key project data and materials is identified and status reports for each operation are presented.

  17. Analisis Kecelakaan Kerja Pada Proyek Bangunan Gedung (Analysis of Work Accident on Building Construction Projects)

    OpenAIRE

    Ferdiansyah, Deni; Winarno, Setya; M, Faisol A

    2009-01-01

    Work accidents and fatalities often happen in construction industry, thus a study on this matter to promote safety management needs a thorough analysis of their elements. The purpose of this paper is to identify various types of accidents, cost of accident and insurance premium, and also the correlation between the types of accidents and their costs. The data was collected from thirty construction projects around Daerah Istimewa Yogyakarta province and surrounding areas. These data included t...

  18. Project Finance Model for Small Contractors in USA

    Directory of Open Access Journals (Sweden)

    Jawahar Nesan

    2012-11-01

    Full Text Available Construction projects do not require a large capital outlay but a large working capital to start up the project. Unfortunately, for small contractors there are very limited options available from the banks or other lending institutions to cover this large working capital requirement in the absence of sufficient collateral. The “Project Finance” method presented in this paper is recommended as the most effective method for small contractors in the United States. The problems of small and start up contractors in funding their projects have been little addressed in the literature. The current financing practices were observed through both the literature review and interviews with contractors and bankers in the western Michigan area and subsequently a system has been proposed which could help a small start-up company seeking higher growth. The growth rates that can be achieved using the project finance system in contrast to the traditional “line of credit” arrangements as illustrated in this paper show that the project finance model is beneficial.

  19. Genomics and the human genome project: implications for psychiatry

    OpenAIRE

    Kelsoe, J R

    2004-01-01

    In the past decade the Human Genome Project has made extraordinary strides in understanding of fundamental human genetics. The complete human genetic sequence has been determined, and the chromosomal location of almost all human genes identified. Presently, a large international consortium, the HapMap Project, is working to identify a large portion of genetic variation in different human populations and the structure and relationship of these variants to each other. The Human Genome Project h...

  20. Ageing and feature binding in visual working memory: The role of presentation time.

    Science.gov (United States)

    Rhodes, Stephen; Parra, Mario A; Logie, Robert H

    2016-01-01

    A large body of research has clearly demonstrated that healthy ageing is accompanied by an associative memory deficit. Older adults exhibit disproportionately poor performance on memory tasks requiring the retention of associations between items (e.g., pairs of unrelated words). In contrast to this robust deficit, older adults' ability to form and temporarily hold bound representations of an object's surface features, such as colour and shape, appears to be relatively well preserved. However, the findings of one set of experiments suggest that older adults may struggle to form temporary bound representations in visual working memory when given more time to study objects. However, these findings were based on between-participant comparisons across experimental paradigms. The present study directly assesses the role of presentation time in the ability of younger and older adults to bind shape and colour in visual working memory using a within-participant design. We report new evidence that giving older adults longer to study memory objects does not differentially affect their immediate memory for feature combinations relative to individual features. This is in line with a growing body of research suggesting that there is no age-related impairment in immediate memory for colour-shape binding.

  1. Project SEED. What Works Clearinghouse Intervention Report

    Science.gov (United States)

    What Works Clearinghouse, 2012

    2012-01-01

    "Project SEED" is a supplemental mathematics program for low-achieving students in grades 3 through 8 and is intended to prepare students to be successful in high school and college math. Based on the Socratic method, instruction is delivered through a series of questions to the class. In addition to individual responses, the instructor…

  2. Impact of Project Leadership Facets on Project Outcome

    Directory of Open Access Journals (Sweden)

    Arslan Ayub

    2015-08-01

    Full Text Available The study analyzes the role of project leadership facets on effective project outcome. Numerous such initiatives have already been taken on project outcome/performance in the context of apposite leadership styles or project management. However, the current study is unique in the milieu of project outcome that it introduces a new leadership approach, which throws light on the significance of variant leadership facets on project outcome. The study uses explanatory approach; primary data is collected from project management professionals working in different project organizations. The study uses structural equation model (SEM technique to test the hypothesis. The study found a positive relationship between project leadership facets and project outcome.

  3. Present Status of the JENDL Project (May, 2013). WPEC Meeting, Paris, France, 23-24 May, 2013

    International Nuclear Information System (INIS)

    Fukahori, Tokio; Iwamoto, Osamu; Ishikawa, Makoto

    2013-01-01

    This paper briefly presents the present status of the Japanese JENDL Project: organization of Japanese Nuclear Data Committee (JNDC), a research committee for JAEA research activities; Nuclear Data Evaluation (JENDL-4.0 Updated Files and JENDL-4.0 Plus, benchmarking for fission reactor applications (criticality for thermal systems, adjusted library for fast systems), new evaluations, covariances, evaluation tools, fission products decay data file); other activities such as the 2012 Symposium on Nuclear Data at Kyoto University Research Reactor Institute, the initiation of conversation on Covariance Data with users, the celebration of the Golden Jubilee (since 1963) of JNDC

  4. Rebuilding for Sustainability: Case Studies in the Making (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Billman, L.

    2013-06-01

    NREL has made significant contributions to communities suffering from natural disasters since 2007 in terms of technical assistance regarding energy efficiency and renewable energy options. NREL's work has covered all aspects of energy, including energy opportunities in community planning, policy design, new program design, and specific project design and implementation for energy related to electricity generation, building energy use, and transportation. This presentation highlights work done in New Orleans following Hurricane Katrina; Greensburg, Kansas, following a devastating tornado; and New York and New Jersey following Hurricane Sandy.

  5. The Role of Research in School Project Work and Teacher Development: Results from Project "Schools Ethics Technology."

    Science.gov (United States)

    Wellensiek, Anneliese; Lembens, Anja; Schallies, Michael

    "Schools Ethics Technology" was a German interdisciplinary research project with the Centre of Ethics in the Sciences at the University of Tubingen. The project highlighted the new topic of biotechnology and genetic engineering, involving the formation of active project groups within schools. This study examined teaching activities…

  6. Project PAT (Pumps Working as Turbines)/IG (Induction Generators): a new concept for generation of electric power through micro scale hydroelectric power plants; Projeto BFT (Bombas Funcionado como Turbinas)/GI (Geradores de Inducao): um novo conceito para geracao de energia eletrica atraves de microcentrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Viana, Augusto Nelson Carvalho [Universidade Federal de Itajuba (UNIFEI), Itajuba, MG (Brazil). Inst. de Recursos Naturais. Programa de Pos-graduacao em Engenharia da Energia; Medeiros, Daniel de Macedo; Ricardo, Mateus [Universidade Federal de Itajuba (UNIFEI), Itajuba, MG (Brazil). Inst. de Recursos Naturais], Emails: augusto@unifei.edu.br, macedo@unifei.edu.br, mathidr@yahoo.com.br

    2006-07-01

    The present work has as objective to present the main bases of 'PAT/IG Project', accomplished in Boa Esperanca Farm (Delfim Moreira - MG), by an accord between Itajuba's Federal University and Mines and Energy Ministry. In a moment that the look for sustainable development is the law in Brazil, low costs and environmental impact alternatives must be prioritized. By this way, the PAT/IG Project continuous the Viana's (1987) works, that developed all Brazilian theoretical bases for using Pumps Working as Turbine (PAT). Besides that, the application of induction motors operating as induction generators will be evaluated, as the velocity control system of the PAT/IG group will be developed. The existing Boa Esperanca Farm's micro power plant will be rebuild ed, to receive a new generating group formed for a PAT and a IG, that will be used as natural sized test workbench of Itajuba's Federal University. At the ending of the project, there will be enough subsidies to prove, in practice, the feasibility presented in laboratorial tests by PAT/IG groups as conventional turbines replacer in micro powerplants. (author)

  7. Work-life Experience and Learner Identity

    DEFF Research Database (Denmark)

    Kondrup, Sissel

    2013-01-01

    In order to examine how orientations toward learning activities are situated in and conditioned by specific work-life experiences it is crucial to develop a dialectic concept of learner identity. Based on a qualitative research-project (Kondrup 2012) this paper outlines how unskilled work forms...... a specific condition for engaging in lifelong learning. The aim of the study was to examine how an unskilled work-life presents certain conditions for the formation, maintenance and transformation of a learner identity, enabling workers to position themselves as educable subjects and engage in formal...

  8. Planning and leading of the technological processes by mechanical working with microsoft project

    Science.gov (United States)

    Nae, I.; Grigore, N.

    2016-08-01

    Nowadays, fabrication systems and methods are being modified; new processing technologies come up, flow sheets develop a minimum number of phases, the flexibility of the technologies grows up, new methods and instruments of monitoring and leading the processing operations also come up. The technological course (route, entry, scheme, guiding) referring to the series of the operation, putting and execution phases of a mark in order to obtain the final product from the blank is represented by a sequence of activities realized by a logic manner, on a well determined schedule, with a determined budget and resources. Also, a project can be defined as a series of specific activities, methodical structured which they aim to finish a specific objective, within a fixed schedule and budget. Within the homogeneity between the project and the technological course, this research is presenting the defining of the technological course of mechanical chip removing process using Microsoft Project. Under these circumstances, this research highlights the advantages of this method: the celerity using of other technological alternatives in order to pick the optimal process, the job scheduling being constrained by any kinds, the standardization of some processing technological operations.

  9. Canons and Heroes: The Reception of the Complete Works Translation Project in Finland, 2002-13

    Directory of Open Access Journals (Sweden)

    Keinänen Nely

    2017-12-01

    Full Text Available This essay examines the reception of the ten-year Complete Works translation project undertaken by the Finnish publishing company Werner Söderström Oy (WSOY in 2004-13. Focusing on reviews published in the first and last years of the project, the essay details ongoing processes of Shakespeare (re-canonization in Finland, as each new generation explains to itself what Shakespeare means to them, and why it continues to read, translate and perform Shakespeare. These processes are visible in comments from the series editors and translators extolling the importance of Shakespeare’s work and the necessity of creating new, modern translations so Finns can read Shakespeare in their mother tongue; in discussions of the literary qualities of a good Shakespeare translation, e.g. whether it is advisable to use iambic pentameter in Finnish, a trochaic language; and in the creation of publisher and translator “heroes,” who at significant cost to themselves, whether in money in terms of the publisher, or time and effort in terms of the translators, labour to provide the public with their Shakespeare in modern Finnish. While on the whole reviewers celebrated the new translations, there was some resistance to changes in familiar lines from older translations, such as Macbeth’s “tomorrow” speech, suggesting that there are nevertheless some limits on modernizing “classic” translations.

  10. An Introduction to International Factoring & Project Finance

    OpenAIRE

    Glinavos, Ioannis

    2002-01-01

    This work consists of two essays on law and finance in international trade. It addresses the means of raising funds for investment through receivables financing and project finance. The first essay discusses the role of receivables financing and in particular factoring in international trade. It examines the nature of factoring transactions and presents the efforts at regulation on an international level aimed at overcoming the difficulties in enforcement. The second essay discusses project f...

  11. Product development projects dynamics and emergent complexity

    CERN Document Server

    Schlick, Christopher

    2016-01-01

    This book primarily explores two topics: the representation of simultaneous, cooperative work processes in product development projects with the help of statistical models, and the assessment of their emergent complexity using a metric from theoretical physics (Effective Measure Complexity, EMC). It is intended to promote more effective management of development projects by shifting the focus from the structural complexity of the product being developed to the dynamic complexity of the development processes involved. The book is divided into four main parts, the first of which provides an introduction to vector autoregression models, periodic vector autoregression models and linear dynamical systems for modeling cooperative work in product development projects. The second part presents theoretical approaches for assessing complexity in the product development environment, while the third highlights and explains closed-form solutions for the complexity metric EMC for vector autoregression models and linear dyn...

  12. Electrocortical and ocular indices of attention to fearful and neutral faces presented under high and low working memory load.

    Science.gov (United States)

    MacNamara, Annmarie; Schmidt, Joseph; Zelinsky, Gregory J; Hajcak, Greg

    2012-12-01

    Working memory load reduces the late positive potential (LPP), consistent with the notion that functional activation of the DLPFC attenuates neural indices of sustained attention. Visual attention also modulates the LPP. In the present study, we sought to determine whether working memory load might exert its influence on ERPs by reducing fixations to arousing picture regions. We simultaneously recorded eye-tracking and EEG while participants performed a working memory task interspersed with the presentation of task-irrelevant fearful and neutral faces. As expected, fearful compared to neutral faces elicited larger N170 and LPP amplitudes; in addition, working memory load reduced the N170 and the LPP. Participants made more fixations to arousing regions of neutral faces and faces presented under high working memory load. Therefore, working memory load did not induce avoidance of arousing picture regions and visual attention cannot explain load effects on the N170 and LPP. Copyright © 2012 Elsevier B.V. All rights reserved.

  13. New developments in Generator Services project

    International Nuclear Information System (INIS)

    Karneyeu, A; Kirsanov, M; Konstantinov, D; Ryabov, A; Zenin, O; Pokorski, W; Ribon, A

    2011-01-01

    The LOG Generator Services project provides validated, LOG compliant Monte Carlo generators code for both the theoretical and experimental communities at the LHC. In this paper we present the recent developments and the future plans of the project. We report on the current status of the generators repository, the new Autotools-based build system, as well as the new installation tools to create mirrors of the repository. We discuss new developments in testing and physics validation procedures in particular the use of HepMC Analysis Tool, as well as the Rivet validation tool. We also present a new activity, enlarging the scope of the Generator Services project, it is the involvement in the tuning of the Monte Carlo generators. This work, being essential for the understanding of the future LHC data, is now starting with the involvement of all the LHC experiments.

  14. Project Management Plan for Material Stabilization

    International Nuclear Information System (INIS)

    SPEER, D.R.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617/Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides

  15. Radiation safety for decommissioning projects

    International Nuclear Information System (INIS)

    Ross, A.C.

    1999-01-01

    Decommissioning of redundant nuclear facilities is a growth area in the UK at the present time. NUKEM Nuclear Limited is a leading-edge nuclear decommissioning and waste management contractor (with its own in-house health physics and safety department), working for a variety of clients throughout the UK nuclear industry. NUKEM Nuclear is part of the prestigious, international NUKEM group, a world-class organization specializing in nuclear engineering and utilities technologies. NUKEM Nuclear is involved in a number of large, complex decommissioning projects, both in its own right and as part of consortia. This paper explores the challenges presented by such projects and the interfaces of contractor, client and subcontractors from the point of view of a radiation protection adviser. (author)

  16. RIKEN radioactive isotope beam factory projectPresent status and ...

    Indian Academy of Sciences (India)

    Programs for studying nuclear reactions and structure of exotic nuclei available at the RIKEN radioactive isotope beam factory project are introduced and discussed by demonstrating recent highlights. Special emphasis ... RIKEN Nishina Center for Accelerator-Based Science, 2-1 Hirosawa, Wako, Saitama 351-0198, Japan ...

  17. FAB - Underwater and underground electric connection between France and Great Britain via Aurigny. File of presentation of the project and of its investigation area. Project synthesis. Impact study constituting an incidence document under the Law on Water. Ground brochure + Sea brochure. Non technical summary. Deliberated opinion of the Environmental Authority on the underwater and underground electrical interconnection between France and Great-Britain via Aurigny (FAB)

    International Nuclear Information System (INIS)

    2014-11-01

    This document gathers several reports. The first one indicates the actors involved in the project of electrical interconnection between France and Great-Britain via Aurigny, presents various technical aspects and works of this project, and proposes a definition and a description of the concerned area. The second report proposes a synthetic presentation of the project: agreement process, project interest, project definition and equipment locations, project technical components and aspects, onshore and offshore environmental aspects, project status and planning. The third report analyses the various onshore aspects of the interconnection project: project description, initial situation of the environment, analysis of the project effects on the environment and on health, analysis of cumulated effects with other known projects, sketches of examined substitution solutions and reasons for the selection of the project, elements of analysis of compliance with land uses and various planning documents, measures aimed at avoiding, reducing or compensating project effects, methods to assess initial status and effects, faced difficulties. The fourth report addresses the same issues as the previous one but for offshore aspects. The fifth report is a non technical summarised presentation of the project which presents the French side, describes the elaboration approach, the offshore and onshore legs of the project, an assessment of impacts on Natura 2000 sites. It notably contains several detailed geographical and geological maps to illustrate and to highlight the various environmental, geological, economic, social, urban or landscape impacts. The last document is the detailed opinion of the Environmental Authority on this project. It addresses the context, the project principle, implementation and cost, environmental stakes and challenges, and impacts

  18. The supervisor in the project-organized group work should participate in developing the students' project competencies

    DEFF Research Database (Denmark)

    Hansen, Søren

    2004-01-01

    The article demonstrates how the supervisor can facilitate development of competencies as an implicit part of supervising study projects.......The article demonstrates how the supervisor can facilitate development of competencies as an implicit part of supervising study projects....

  19. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  20. Non-Profit/Higher Education Project Management Series: The Project Plan

    Science.gov (United States)

    Burgher, Karl E.; Snyder, Michael

    2012-01-01

    This is the second installment of the AACRAO management series focusing on project management in the academy. In this article, the authors focus on white papers (often called charters, briefs, or fact sheets) and their partner, the work plan. The work plan is a detailed document that defines each aspect of a project. It is often preceded by a…

  1. Quality of Work and Team- and Project Based Work Practices in Engineering

    DEFF Research Database (Denmark)

    Buch, Anders; Andersen, Vibeke

    2015-01-01

    It is the aim of this paper to investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals and eventually their quality of work. The paper investigates how professional engineering...... ractices are enacted in two engineering consultancy companies in Denmark where ‘teamwork’ has been or is an ideal for organizing work....

  2. Safety at Work : Research Methodology

    NARCIS (Netherlands)

    Beurden, van K. (Karin); Boer, de J. (Johannes); Brinks, G. (Ger); Goering-Zaburnenko, T. (Tatiana); Houten, van Y. (Ynze); Teeuw, W. (Wouter)

    2012-01-01

    In this document, we provide the methodological background for the Safety atWork project. This document combines several project deliverables as defined inthe overall project plan: validation techniques and methods (D5.1.1), performanceindicators for safety at work (D5.1.2), personal protection

  3. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  4. System to determine present elements in oily samples; Sistema para determinar elementos presentes en muestras oleosas

    Energy Technology Data Exchange (ETDEWEB)

    Mendoza G, Y

    2004-11-01

    In the Chemistry Department of the National Institute of Nuclear Investigations of Mexico, dedicated to analyze samples of oleaginous material and of another origin, to determine the elements of the periodic table present in the samples, through the Neutron activation analysis technique (NAA). This technique has been developed to determine majority elements in any solid, aqueous, industrial and environmental sample, which consists basically on to irradiate a sample with neutrons coming from the TRIGA Mark III reactor and to carry out the analysis to obtain those gamma spectra that it emits, for finally to process the information, the quantification of the analysis it is carried out in a manual way, which requires to carry out a great quantity of calculations. The main objective of this project is the development of a software that allows to carry out the quantitative analysis of the NAA for the multielemental determination of samples in an automatic way. To fulfill the objective of this project it has been divided in four chapters: In the first chapter it is shortly presented the history on radioactivity and basic concepts that will allow us penetrate better to this work. In the second chapter the NAA is explained which is used in the sample analysis, the description of the process to be carried out, its are mentioned the characteristics of the used devices and an example of the process is illustrated. In the third chapter it is described the development of the algorithm and the selection of the programming language. The fourth chapter it is shown the structure of the system, the general form of operation, the execution of processes and the obtention of results. Later on the launched results are presented in the development of the present project. (Author)

  5. Reflexive project management in high-abition projects

    NARCIS (Netherlands)

    Loeber, Anne; Vermeulen, T.

    2016-01-01

    Purpose
    The Aristotelian notion of phronèsis inspired innovative work in the realm of project management as well as in literature on sustainability and societal transformations. We argue that both literatures may benefit from a dialogue between the two, especially in view of outlining project

  6. NASA Work Breakdown Structure (WBS) Handbook

    Science.gov (United States)

    Terrell, Stefanie M.

    2018-01-01

    The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements.

  7. [Administration of the "Healthy School" project].

    Science.gov (United States)

    Bjegović, V; Zivković, M; Marinković, J; Vuković, D; Legetić, B

    1996-01-01

    , the level of personal influence on different aspects of Project development and overall work motivation and satisfaction of all participants. (c) The outcomes of the given management attempts were analyzed by the following output variables: the number of different types of meetings held, the number of seminars, mass media presentation and articles, the amount of money raised and the number of questionnaires administered. Triangular method was used to gather the data: (1) direct observation, (2) four types of questionnaires and (3) project reports and documentation. Four types of specially designed questionnaires were used to examine four groups of participants (Project Coordinators, School Project Managers, Directors and Project Co-operators). The questionnaires were different in the questions concerning examinees' project tasks and types of external communication, while the questions referring to personal characteristics, general features of the project (goals, common jobs, participation in decision making, motivation and satisfaction) were the same for all groups. The average age of the project participants was 45.50 ranging from 25 to 60 years of age. The oldest group was the group of School Directors, while the youngest were School Co-operators. The project has been run mostly by women, while men were predominantly represented in the group of School Directors. The teaching occupation is presented by 61.8%, the rest being health professionals, mostly of preventive orientation. The analysis and classification of participants goals verify that the personal goals of all participants correspond with the main Project goals. Certain groups have also some additional motives which support their successful and affective movement towards the overall Project goals. The largest problem in all groups appear to be in the field of financing the Project activities (Figure 1). (ABSTRACT TRUNCATED)

  8. Project structure plan requirements for the deconstruction projects

    International Nuclear Information System (INIS)

    Petrasch, Peter; Schmitt, Christian; Stapf, Meike

    2011-01-01

    The deconstruction of nuclear facilities requires due to the particular conditions and the size of the project a special project planning. The authors analyze the possible requirements to be fulfilled by a project structure plan for nuclear facilities, including personnel resources, organization structure, budget questions, operation and project oriented measures, possibility of modifications and supplements. Further topics include controlling and project realization procedures, documentation, third party activities (authorities, consultants, surveyors), logistics and transport, and radiation protection issues. Several questions remain for plants-specific planning, including the integration of the plant personnel, administrative work, project management, economic and financial issues, radioactive waste management issues.

  9. Nuclear safety project

    International Nuclear Information System (INIS)

    1982-06-01

    The Annual Report 1981 is a detailed description (in German language) of work within the Nuclear Safety Project performed in 1981 in the nuclear safety field by KfK institutes and departments and by external institutes on behalf of KfK. It includes for each individual research activity short summaries in English language on - work completed - results obtained - plans for future work. This report was compiled by the project management. (orig.) [de

  10. 75 FR 2463 - Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers...

    Science.gov (United States)

    2010-01-15

    ... be considered a breach of contract and shall not entitle the Contractor to a price adjustment under... constitute a breach of this contract and shall not entitle the Contractor to any price adjustment under the... Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers Clauses...

  11. Statements of work for FY 1996 to 2001 for the Hanford Low-Level Tank Waste Performance Assessment Project

    International Nuclear Information System (INIS)

    Mann, F.M.

    1995-01-01

    The statements of work for each activity and task of the Hanford Low-Level Tank Waste Performance Assessment project are given for the fiscal years 1996 through 2001. The end product of this program is approval of a final performance assessment by the Department of Energy in the year 2000

  12. 6 Project-Management Tips

    Science.gov (United States)

    Demski, Jennifer

    2012-01-01

    When it comes to project management, the IT department is typically its own worst enemy. When project requests are pushed through the budgeting process by different departments, it's up to IT to make them all work. The staff is required to be "heroic" to get the project load done. People get to work over weekends and postpone their vacations. The…

  13. Differences between Presentation Methods in Working Memory Procedures: A Matter of Working Memory Consolidation

    OpenAIRE

    Ricker, Timothy J.; Cowan, Nelson

    2013-01-01

    Understanding forgetting from working memory, the memory used in ongoing cognitive processing, is critical to understanding human cognition. In the past decade, a number of conflicting findings have been reported regarding the role of time in forgetting from working memory. This has led to a debate concerning whether longer retention intervals necessarily result in more forgetting. An obstacle to directly comparing conflicting reports is a divergence in methodology across studies. Studies tha...

  14. Technology projects for characterization--monitoring of volatile organic compounds (VOCs)

    Energy Technology Data Exchange (ETDEWEB)

    Junk, G.A.; Haas, W.J. Jr.

    1992-07-01

    One hundred thirty technology project titles related to the characterization of volatile organic compounds (VOCs) at an arid site are listed alphabetically by first contact person in a master compilation that includes phone numbers, addresses, keywords, and short descriptions. Separate tables are presented for 62 field-demonstrated, 36 laboratory-demonstrated, and 35 developing technology projects. The technology projects in each of these three categories are also prioritized in separate summary tables. Additional tables are presented for a number of other categorizations of the technology projects: In Situ; Fiberoptic; Mass Spectrometer; Optical Spectroscopy; Raman or SERS; Ion Mobility or Acoustic; Associated; and Commercial. Four lists of contact person names are provided so details concerning the projects that deal with sampling, and VOCs in gases, waters, and soils (sediments) can be obtained. Finally, seven wide-ranging conclusions based on observations and experiences during this work are presented.

  15. Technology projects for characterization--monitoring of volatile organic compounds (VOCs)

    International Nuclear Information System (INIS)

    Junk, G.A.; Haas, W.J. Jr.

    1992-07-01

    One hundred thirty technology project titles related to the characterization of volatile organic compounds (VOCs) at an arid site are listed alphabetically by first contact person in a master compilation that includes phone numbers, addresses, keywords, and short descriptions. Separate tables are presented for 62 field-demonstrated, 36 laboratory-demonstrated, and 35 developing technology projects. The technology projects in each of these three categories are also prioritized in separate summary tables. Additional tables are presented for a number of other categorizations of the technology projects: In Situ; Fiberoptic; Mass Spectrometer; Optical Spectroscopy; Raman or SERS; Ion Mobility or Acoustic; Associated; and Commercial. Four lists of contact person names are provided so details concerning the projects that deal with sampling, and VOCs in gases, waters, and soils (sediments) can be obtained. Finally, seven wide-ranging conclusions based on observations and experiences during this work are presented

  16. Spring Chinook Supplementation Monitoring; Yakima Fisheries Project Management Plan, 1996 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Busack, Craig A. (Washington Department of Fish and Wildlife, Olympia, WA); Watson, Bruce; Johnston, Mark (Confederated Tribes and Bands of the Yakama Nation, Fisheries Resource Management, Toppenish, WA)

    1997-08-01

    The Yakima Fisheries Project (YFP), a key element in the Northwest Power Planning Council's Fish and Wildlife Program, has been in planning for more than ten years. It was initially conceived as, and is still intended to be, a multipurpose project. Besides increasing fish production in the Yakima basin, it is also intended to yield information about supplementation that will be of value to the entire Columbia basin, and hopefully the entire region. Because of this expectation of increased knowledge resulting from the project, a large and comprehensive monitoring program has always been seen as an integral part of the project. Despite the importance of monitoring to the project, monitoring planning has been slow to develop. The only general written statement of monitoring planning for the project is Chapter 9 of the current Project Status Report (PSR), written in 1993. That document is a reasonably good overview, and presents some important basic principles of monitoring, but is decidedly lacking in specifics. Throughout 1996 the Monitoring Implementation and Planning Team (MIPT), an interdisciplinary group of biologists who have worked on the project for several years, worked to develop a comprehensive spring chinook monitoring plan for the project. The result is the present document.

  17. First interim project review meeting on management of water hyacinth

    International Nuclear Information System (INIS)

    1980-01-01

    The first project planning meeting was held in New Delhi during 1978 and the second, a project review meeting, in Papua New Guinea during June 1979, both funded by UNEP. Reports from the regional coordinators for Bangladesh, Malaysia, Sri Lanka, Fiji and India are presented. Also presented are reports from the national coordinators for Malaysia, Bangladesh and India. Two visits (a visit to India, Bangladesh and Sri Lanka to study the feasibility of making a film on the work done with water hyacinth and a visit to the U.S. by the regional project coordinator) are also described

  18. General concept and present status of the AMS - project

    International Nuclear Information System (INIS)

    Stan-Sion, C.; Plostinaru, D.; Catana, L.; Radulescu, M.; Marinescu, L.; Dima, R.

    1998-01-01

    The Institute of Nuclear Physics and Engineering, IFIN-HH, Bucharest started in 1996 the Construction Project for an AMS facility in Bucharest. The Project is supported by the German-Romanian scientific cooperation project RUM-013-97. In the frame of this project, scientific research, construction activities of electronic and mechanical devices and activities for calibration and optimization were performed. The activities in this year are concentrated on experimental tests and optimization of the AMS analysis procedure and on improving the tandem acceleration and transmission capability. These are as follows: - construction and tests of a high current sputter source, with spherical ionizer and automatic many-sample changer. Experimental tests and measurements of emittance and beam profile; - construction of the Injector Platform; - construction and tests of a Bragg - charged particle detector; - calibration and optimization experiments of the AMS ensemble. The AMS facility is based on the 8 MV - FN tandem accelerator and has the following main components: the AMS ion injector, a Wien - velocity filter, a 60 angle bending magnet and the particle detection system. For heavy particle detection we constructed a Bragg ionization chamber. This should be used for standard AMS measurements. A specific part of the AMS facility represents the AMS injector deck. The main components are: the high current sputter source, the analyzing double focusing magnet, two optical systems, a four-slit beam defining system in front of the analyzing magnet and a four-slit aperture with remote controlled Faraday cup (for beam current integration of stable isotopes) after the magnet. Finally, the pre-acceleration tube (40 kV) connects the ensemble to the ground potential of the accelerator beam line. For AMS measurements, the sputter ion source is able to provide both high beam current and small beam emittance. These characteristics are necessary in order to achieve high analyzing

  19. Hyperbolicity of projective hypersurfaces

    CERN Document Server

    Diverio, Simone

    2016-01-01

    This book presents recent advances on Kobayashi hyperbolicity in complex geometry, especially in connection with projective hypersurfaces. This is a very active field, not least because of the fascinating relations with complex algebraic and arithmetic geometry. Foundational works of Serge Lang and Paul A. Vojta, among others, resulted in precise conjectures regarding the interplay of these research fields (e.g. existence of Zariski dense entire curves should correspond to the (potential) density of rational points). Perhaps one of the conjectures which generated most activity in Kobayashi hyperbolicity theory is the one formed by Kobayashi himself in 1970 which predicts that a very general projective hypersurface of degree large enough does not contain any (non-constant) entire curves. Since the seminal work of Green and Griffiths in 1979, later refined by J.-P. Demailly, J. Noguchi, Y.-T. Siu and others, it became clear that a possible general strategy to attack this problem was to look at particular algebr...

  20. Production in Gdlrc and Present Reflections

    Science.gov (United States)

    Kisa, A.; Çolak, S.; Bakici, S.; Özmüş, L.

    2013-08-01

    Recently, Turkey's National Geographic Information System (TNGIS) carried out a more comprehensive studies. General Directorate of Land Registry and Cadastre (GDLRC) within the scope of these studies has projects in many areas within the jurisdiction. GDLRC have started Land Registry and Cadastre Modernization Project (LRCMP) in 2008 and still continues this project. The current project is very successful in the renewal and transfer of digital media, after the completion of the country's digital cadastre. The scope of this project was prepared comprehensive study. The scope of this project was prepared comprehensive study. This studies; human resources development, new cadastre offices renovation and its services improvement, examining and reporting of the valuation of real estate, renovation and updating of the cadastre. All works continues at the same speed and determination. With these developments, GDLRC works with institutions, organizations and citizens. These developments cause a further increase interoperability and trust relationships. GDLRC, across the country, produces, stores, manages and preservesof property information. GDLRC the use and development of real estate is an important way to the work. In this context, one of the layers of spatial information systems, an essential requirement of the images which obtained by means of remote sensing satellite photos and/or consist of aerial photographs, is quite an important role. In research, in order to meet the common needs of different institutions and organizations, aerial photographs and orthophoto imagery are needed. Aerial photographs more up to date, precise, clear and reliable. GDLRC, signing of important projects, is working to implement the Orthophoto Information System (OIS) project. GDLRC equipped with a new photogrammetric systems in 2009. In this way, the technological advances in the industry leading on this issue very closely monitored and carried out the task successfully. 200 000 km2 area

  1. Introducing AstroGen: The Astronomy Genealogy Project

    OpenAIRE

    Tenn, Joseph S.

    2016-01-01

    The Astronomy Genealogy Project ("AstroGen"), a project of the Historical Astronomy Division of the American Astronomical Society (AAS), will soon appear on the AAS website. Ultimately, it will list the world's astronomers with their highest degrees, theses for those who wrote them, academic advisors (supervisors), universities, and links to the astronomers or their obituaries, their theses when on-line, and more. At present the AstroGen team is working on those who earned doctorates with ast...

  2. Natural gas projects, strategies and economics

    International Nuclear Information System (INIS)

    Hamaide, G.

    2000-01-01

    This article summarizes the content of some of the posters presented during the WOC 9 working committee of the CMG 2000 worldwide gas congress: natural gas in the new worldwide energy balance; eastern Russia: the last gas projects; the new underwater technologies and the availability of natural gas. (J.S.)

  3. Developing and operating a remotely operated work system in hostile and emergency environments

    International Nuclear Information System (INIS)

    Thorne, P.M.

    1987-01-01

    The author presents an overview of the factors that a project manager considering the use of remote work systems must keep in mind during the planning and execution of operations in hostile environments. Interfacing of the remote work system to the task and understanding mission parameters is emphasized. The author's thesis is based on many years of technical operations and project management roles using remote work systems in the subsea oil industry, military and, most recently, space and nuclear applications

  4. Theoretical Approach Regarding the Bases of Success and Reasons that May Lead to Failure in Project Management

    OpenAIRE

    Larisa Loredana Dragolea; Denisa Cotîrlea Denisa

    2012-01-01

    The present paper work deals with theoretical concepts regarding the reasons that may lead to a project’s failure or success. The primary aim of the work paper is to help readers to get a view of conceptualizations of project management and its phases, while providing an opportunity to see the interferences of factors that may determine project’s success. This work paper also contains some aspects regarding key-factors and elements that may assure a good management of projects. The present su...

  5. Rehabilitation and modernization project of units 1 and 2 of Laguna Verde Nuclear Power Plant. A strengthening project to 120%. (2nd phase)

    International Nuclear Information System (INIS)

    Liebana, B.; Merino, A.; Garcia, J. L.; Gomez, M.; Martinez, I.; Ruiz, L.

    2010-01-01

    The power increase of the Laguna Verde Nuclear Power Plant is a project for the rehabilitation and modernization of the turbo and associated equipment to get an increase of its power and of its service life. The project scope includes the design, the engineering, the equipment supply, the installation, the testing and the commissioning. This article presents the work of the second phase.

  6. ECUT (Energy Conversion and Utilization Technologies) program: Biocatalysis project

    Science.gov (United States)

    Baresi, Larry

    1989-03-01

    The Annual Report presents the fiscal year (FY) 1988 research activities and accomplishments, for the Biocatalysis Project of the U.S. Department of Energy, Energy Conversion and Utilization Technologies (ECUT) Division. The ECUT Biocatalysis Project is managed by the Jet Propulsion Laboratory, California Institute of Technology. The Biocatalysis Project is a mission-oriented, applied research and exploratory development activity directed toward resolution of the major generic technical barriers that impede the development of biologically catalyzed commercial chemical production. The approach toward achieving project objectives involves an integrated participation of universities, industrial companies and government research laboratories. The Project's technical activities were organized into three work elements: (1) The Molecular Modeling and Applied Genetics work element includes research on modeling of biological systems, developing rigorous methods for the prediction of three-dimensional (tertiary) protein structure from the amino acid sequence (primary structure) for designing new biocatalysis, defining kinetic models of biocatalyst reactivity, and developing genetically engineered solutions to the generic technical barriers that preclude widespread application of biocatalysis. (2) The Bioprocess Engineering work element supports efforts in novel bioreactor concepts that are likely to lead to substantially higher levels of reactor productivity, product yields and lower separation energetics. Results of work within this work element will be used to establish the technical feasibility of critical bioprocess monitoring and control subsystems. (3) The Bioprocess Design and Assessment work element attempts to develop procedures (via user-friendly computer software) for assessing the energy-economics of biocatalyzed chemical production processes, and initiation of technology transfer for advanced bioprocesses.

  7. Site Observational Work Plan for the UMTRA project site at Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1995-02-01

    Ground water compliance for the Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Ambrosia Lake, New Mexico, site, is governed by the Uranium Mills Tailings Radiation Control Act (42 USC section 7901 et seq.) and the U.S. Environmental Protection Agency's Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR Part 192; 60 FR 2854). The EPA standards describe specific conditions for which the U.S. Department of Energy (DOE) may apply for supplemental standards for contaminated ground water rather than meeting background levels or numerical standards. To achieve compliance with Subpart A of the EPA standards the residual radioactive materials are currently being consolidated on the site by the DOE in a disposal cell, isolating them from direct human or ecological contact and further dispersion into the environment. Completion of the disposal cell is scheduled for early 1995. An environmental assessment and a Finding of No Significant Impact (FONSI) were completed in 1987. Concurrence with the UMTRA Surface Project Ambrosia Lake remedial action plan (RAP) was granted by the U.S. Nuclear Regulatory Commission (NRC) and state of New Mexico in 1990. The DOE deferred compliance with Subpart B of the EPA standards in the Surface Project RAP. This site observational work plan (SOWP) is the first document to address ground water compliance under Subpart B at the Ambrosia Lake site. The Ambrosia Lake UMTRA Project site is within the Grants Mineral Belt and was one of numerous uranium mills supplied by many local mines. Ground water contamination at the site occurred as a result of uranium mill operations. Contamination of ground water resulted from discharge of waste water, infiltration of water through the tailings pile, hydraulic placement of mill tailings in nearby mines, and water pumped from mine shafts

  8. Understanding the Meaning of “Project Success”

    Directory of Open Access Journals (Sweden)

    Goparaju Purna Sudhakar

    2016-09-01

    Full Text Available Fortune 500 organizations are executing their tasks using projects. Project management is the area of concentration across the world. Different stakeholders have a different perspective about project success. The meaning of project success had been explained in this article. In addition, the Project Critical Success Factors (CSFs were mentioned. The research of Standish Group on project success and project success metrics was presented. Earlier research on the meaning of project success and project critical success factors was highlighted. The works of Jeffery K. Pinto and Dennis P. Slevin, David and Adam, DeLone and McLean, and The Standish Group Research were discussed in this article. The methodology included secondary research based on literature view of prominent empirical studies and the literature reviews by making note of findings and observations from those studies. The initial literature collected led to further search of articles based on their references. The research findings indicate that the top of the most success factors for many projects include project objective, top management commitment, competent project team, and user involvement.

  9. Economics, funding and the influence of politics on the UMTRA Project

    International Nuclear Information System (INIS)

    Hamp, S.

    1993-01-01

    This presentation discusses the factors contributing to the cost of the Uranium Mill Tailings Remediation Action Project and the political process involved in the funding. Topics covered include the following: Funding estimate and growth of estimate; Management actions during process; how the political process worked; cost of completed sites; economic benefit analysis of the project to Colorado; cost reduction program for the UMTRA project

  10. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  11. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    Science.gov (United States)

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  12. Military Munitions Waste Working Group report

    International Nuclear Information System (INIS)

    1993-01-01

    This report presents the findings of the Military Munitions Waste Working Group in its effort to achieve the goals directed under the Federal Advisory Committee to Develop On-Site Innovative Technologies (DOIT Committee) for environmental restoration and waste management. The Military Munitions Waste Working Group identified the following seven areas of concern associated with the ordnance (energetics) waste stream: unexploded ordnance; stockpiled; disposed -- at known locations, i.e., disposal pits; discharged -- impact areas, unknown disposal sites; contaminated media; chemical sureties/weapons; biological weapons; munitions production; depleted uranium; and rocket motor and fuel disposal (open burn/open detonation). Because of time constraints, the Military Munitions Waste Working Group has focused on unexploded ordnance and contaminated media with the understanding that remaining waste streams will be considered as time permits. Contents of this report are as follows: executive summary; introduction; Military Munitions Waste Working Group charter; description of priority waste stream problems; shortcomings of existing approaches, processes and technologies; innovative approaches, processes and technologies, work force planning, training, and education issues relative to technology development and cleanup; criteria used to identify and screen potential demonstration projects; list of potential candidate demonstration projects for the DOIT committee decision/recommendation and appendices

  13. Military Munitions Waste Working Group report

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-30

    This report presents the findings of the Military Munitions Waste Working Group in its effort to achieve the goals directed under the Federal Advisory Committee to Develop On-Site Innovative Technologies (DOIT Committee) for environmental restoration and waste management. The Military Munitions Waste Working Group identified the following seven areas of concern associated with the ordnance (energetics) waste stream: unexploded ordnance; stockpiled; disposed -- at known locations, i.e., disposal pits; discharged -- impact areas, unknown disposal sites; contaminated media; chemical sureties/weapons; biological weapons; munitions production; depleted uranium; and rocket motor and fuel disposal (open burn/open detonation). Because of time constraints, the Military Munitions Waste Working Group has focused on unexploded ordnance and contaminated media with the understanding that remaining waste streams will be considered as time permits. Contents of this report are as follows: executive summary; introduction; Military Munitions Waste Working Group charter; description of priority waste stream problems; shortcomings of existing approaches, processes and technologies; innovative approaches, processes and technologies, work force planning, training, and education issues relative to technology development and cleanup; criteria used to identify and screen potential demonstration projects; list of potential candidate demonstration projects for the DOIT committee decision/recommendation and appendices.

  14. Predicting on-site environmental impacts of municipal engineering works

    International Nuclear Information System (INIS)

    Gangolells, Marta; Casals, Miquel; Forcada, Núria; Macarulla, Marcel

    2014-01-01

    The research findings fill a gap in the body of knowledge by presenting an effective way to evaluate the significance of on-site environmental impacts of municipal engineering works prior to the construction stage. First, 42 on-site environmental impacts of municipal engineering works were identified by means of a process-oriented approach. Then, 46 indicators and their corresponding significance limits were determined on the basis of a statistical analysis of 25 new-build and remodelling municipal engineering projects. In order to ensure the objectivity of the assessment process, direct and indirect indicators were always based on quantitative data from the municipal engineering project documents. Finally, two case studies were analysed and found to illustrate the practical use of the proposed model. The model highlights the significant environmental impacts of a particular municipal engineering project prior to the construction stage. Consequently, preventive actions can be planned and implemented during on-site activities. The results of the model also allow a comparison of proposed municipal engineering projects and alternatives with respect to the overall on-site environmental impact and the absolute importance of a particular environmental aspect. These findings are useful within the framework of the environmental impact assessment process, as they help to improve the identification and evaluation of on-site environmental aspects of municipal engineering works. The findings may also be of use to construction companies that are willing to implement an environmental management system or simply wish to improve on-site environmental performance in municipal engineering projects. -- Highlights: • We present a model to predict the environmental impacts of municipal engineering works. • It highlights significant on-site environmental impacts prior to the construction stage. • Findings are useful within the environmental impact assessment process. • They also

  15. Predicting on-site environmental impacts of municipal engineering works

    Energy Technology Data Exchange (ETDEWEB)

    Gangolells, Marta, E-mail: marta.gangolells@upc.edu; Casals, Miquel, E-mail: miquel.casals@upc.edu; Forcada, Núria, E-mail: nuria.forcada@upc.edu; Macarulla, Marcel, E-mail: marcel.macarulla@upc.edu

    2014-01-15

    The research findings fill a gap in the body of knowledge by presenting an effective way to evaluate the significance of on-site environmental impacts of municipal engineering works prior to the construction stage. First, 42 on-site environmental impacts of municipal engineering works were identified by means of a process-oriented approach. Then, 46 indicators and their corresponding significance limits were determined on the basis of a statistical analysis of 25 new-build and remodelling municipal engineering projects. In order to ensure the objectivity of the assessment process, direct and indirect indicators were always based on quantitative data from the municipal engineering project documents. Finally, two case studies were analysed and found to illustrate the practical use of the proposed model. The model highlights the significant environmental impacts of a particular municipal engineering project prior to the construction stage. Consequently, preventive actions can be planned and implemented during on-site activities. The results of the model also allow a comparison of proposed municipal engineering projects and alternatives with respect to the overall on-site environmental impact and the absolute importance of a particular environmental aspect. These findings are useful within the framework of the environmental impact assessment process, as they help to improve the identification and evaluation of on-site environmental aspects of municipal engineering works. The findings may also be of use to construction companies that are willing to implement an environmental management system or simply wish to improve on-site environmental performance in municipal engineering projects. -- Highlights: • We present a model to predict the environmental impacts of municipal engineering works. • It highlights significant on-site environmental impacts prior to the construction stage. • Findings are useful within the environmental impact assessment process. • They also

  16. Construction of hydroelectric project generation: Focuses of the option value

    International Nuclear Information System (INIS)

    Villegas P, Clara Ines

    2002-01-01

    Work present work aims at the development of an analysis, that using the option value approach allows finding the optimal moment (from the environmental point of view), for the construction of an electrical project generation in a zone with determined environmental characteristics. The construction of the project, constitutes an irreversible decision and with uncertainty associated. The evolution of the environmental damage of the zone can be attracting through the variable C of environmental damage. The analysis developed here allows the characterization of a rule (or a barrier of environmental damage called C, which determines when, is optimal to construct the generation project or to conserve the ecosystems of the zone of location. Over this barrier, the construction of the project becomes optimal and below her the conservation of the ecosystems of the zone is privileged

  17. Site observational work plan for the UMTRA project site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1996-01-01

    This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer

  18. European research project 'Metrology for radioactive waste management'

    International Nuclear Information System (INIS)

    Suran, J.

    2014-01-01

    The three-year European research project M etrology for Radioactive Waste Management' was launched in October 2011 under the EMRP (European Metrology Research Programme). It involves 13 European national metrology institutes and a total budget exceeds four million Euros. The project is coordinated by the Czech Metrology Institute and is divided into five working groups. This poster presents impact, excellence, relevance to EMPR objectives, and implementation and management of this project.(author)

  19. Early awareness of emerging risks associated with food and feed production: Synopsis of pertinent work carried out within the SAFE FOODS project

    NARCIS (Netherlands)

    Marvin, H.J.P.; Kleter, G.A.

    2009-01-01

    This introduction to the journal¿s supplement on emerging food and feed safety issues summarizes the objectives and activities of the EU-funded SAFE FOODS project in general and its work package focusing on the early identification of emerging food safety risks, in particular. Within this work

  20. Project network-oriented materials management policy for complex projects

    DEFF Research Database (Denmark)

    Dixit, Vijaya; Srivastava, Rajiv K; Chaudhuri, Atanu

    2015-01-01

    This work devises a materials management policy integrated with project network characteristics of complex projects. It proposes a relative quantitative measure, overall criticality (OC), for prioritisation of items based on penalty incurred due to their non-availability. In complex projects...... managerial tacit knowledge which provides them enough flexibility to provide information in real form. Computed OC values can be used for items prioritisation and as shortage cost coefficient in inventory models. The revised materials management policy was applied to a shipbuilding project. OC values were......, practicing managers find it difficult to measure OC of items because of the subjective factors and intractable nature of penalties involved. However, using their experience, they can linguistically identify the antecedents and relate them to consequent OC. This work adopts Fuzzy Set Theory to capture...