WorldWideScience

Sample records for project prepared statement

  1. 75 FR 49517 - Notice of Intent To Prepare an Environmental Impact Statement for the Walker Ridge Wind Project...

    Science.gov (United States)

    2010-08-13

    ...] Notice of Intent To Prepare an Environmental Impact Statement for the Walker Ridge Wind Project, Lake and...: You may submit comments related to the Walker Ridge Wind Project by any of the following methods: Web... CONTACT: For further information and/or to have your name added to our mailing list, contact Bethney...

  2. 78 FR 13643 - Intent To Prepare a Draft Environmental Impact Statement for the Proposed Delta Wetlands Project...

    Science.gov (United States)

    2013-02-28

    ... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers Intent To Prepare a Draft Environmental Impact Statement for the Proposed Delta Wetlands Project in San Joaquin and Contra Costa Counties... Joaquin County and Holland Tract and Webb Tract are located in Contra Costa County. A wetland delineation...

  3. 76 FR 4371 - Notice of Intent to Prepare an Environmental Impact Statement for the Proposed San Juan Basin...

    Science.gov (United States)

    2011-01-25

    ...; NMNM122352] Notice of Intent to Prepare an Environmental Impact Statement for the Proposed San Juan Basin Energy Connect Project, San Juan County, New Mexico, and La Plata County, Colorado AGENCY: Bureau of Land... prepare an Environmental Impact Statement (EIS) on the proposed San Juan Energy Connect Project, and by...

  4. Environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    Guidelines are presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec. The statement must include a project justification, description of the biophysical and social environments, a project description, and must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Appendices include a memorandum of understanding, list of members of the review bodies, list of briefs submitted at the public scoping hearings, and a list of public comments on the draft guidelines. 17 figs

  5. 76 FR 14745 - Notice To Rescind a Notice of Intent To Prepare an Environmental Impact Statement, Ada and Canyon...

    Science.gov (United States)

    2011-03-17

    ... To Prepare an Environmental Impact Statement, Ada and Canyon Counties, ID AGENCY: Federal Highway... prepare an Environmental Impact Statement for a proposed highway project in Ada and Canyon County, Idaho... Highway 44 from Exit 25 at Interstate 84 in Canyon County to Ballantyne Lane in Ada County. The project is...

  6. 77 FR 20411 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Southline...

    Science.gov (United States)

    2012-04-04

    ... Cruces District Office, Las Cruces, New Mexico, intends to prepare an Environmental Impact Statement (EIS... Administration [LLNM930000 L51010000.ER0000 LVRWG11G0790 NMNM124104] Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Southline Transmission Line Project in New Mexico and Arizona (DOE/EIS...

  7. THE AUDIT OF FINANCIAL STATEMENTS PREPARED BY THE BENEFICIARIES OF EU GRANT

    Directory of Open Access Journals (Sweden)

    Danut Rada

    2013-12-01

    Full Text Available The patrimonial economic entities - public institutions or economic agents, beneficiaries of EU grants, are required to maintain separate accounts situations of the use of these financial resources and also to prepare financial statements in which to be reflected the fees occurred by implementing of projects. The audit of these financial statements is specific and is based on the provisions of international audit standards ISRS 4400 “international standard for related services” and ISAE 3000 “international standard for certification measures”. In some cases, considering the request of the audit beneficiary, can be applied the provisions of ISA 800, International Audit Standard “Special Considerations-Audit of financial statements prepared in accordance with special purpose frameworks”.

  8. 75 FR 44008 - Revised Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Boardman...

    Science.gov (United States)

    2010-07-27

    ... Prepare an Environmental Impact Statement for the Proposed Boardman to Hemingway 500 Kilovolt Transmission..., intend to prepare an Environmental Impact Statement (EIS) for the Boardman to Hemingway (B2H) Project... for construction by IPC between the existing Hemingway substation, located near Melba in Owyhee County...

  9. 77 FR 62256 - Notice of Availability of the Final Environmental Impact Statement for the Mount Hope Project...

    Science.gov (United States)

    2012-10-12

    ... of the Final Environmental Impact Statement for the Mount Hope Project, Eureka County, NE AGENCY... prepared a Final Environmental Impact Statement (EIS) for the Mount Hope Project and by this notice is... Register. ADDRESSES: Copies of the Mount Hope Project Final EIS are available at the Battle Mountain...

  10. THE AUDIT OF FINANCIAL STATEMENTS PREPARED BY THE BENEFICIARIES OF EU GRANT

    OpenAIRE

    Danut Rada; Doina Rada

    2013-01-01

    The patrimonial economic entities - public institutions or economic agents, beneficiaries of EU grants, are required to maintain separate accounts situations of the use of these financial resources and also to prepare financial statements in which to be reflected the fees occurred by implementing of projects. The audit of these financial statements is specific and is based on the provisions of international audit standards ISRS 4400 “international standard for related services” and ISAE 3000 ...

  11. 76 FR 69279 - Notice of Intent to Prepare an Environmental Impact Statement for the Quaking Aspen Wind Energy...

    Science.gov (United States)

    2011-11-08

    ... Intent to Prepare an Environmental Impact Statement for the Quaking Aspen Wind Energy Project, Wyoming... Statement (EIS) for the Quaking Aspen Wind Energy Project (Quaking Aspen). By this notice, BLM is: (1..._Wind_Energy[email protected] ; or Mail: 280 Highway 191 N., Rock Springs, WY 82901. Documents pertinent to...

  12. Development of the UMTRA Project Groundwater Environmental Impact Statement

    International Nuclear Information System (INIS)

    Burt, C.; Ulland, L.; Metzler, D.

    1993-01-01

    This paper discusses the development and preparation of the Programmatic Environmental Impact Statement (PEIS) for the Uranium Mill Tailings Remedial Action (UMTRA) Groundwater Restoration Project. The initiation of the scoping process and preparation of the PEIS began when the Notice of Intent (NOI) to prepare the PEIS was published in the Federal Register on November 18, 1992. However, planning for the PEIS began well before the publication of the NOI, with various aspects of the PEIS, such as the initial formulation of the alternatives and the format of the scoping process, being developed early on. During this preliminary planning phase, it became clear that the preparation of this PEIS posed some significant challenges while at the same time provided for significant opportunities. This paper will briefly summarize the UMTRA Project, discuss the major sections in the PEIS, and describe the challenges and opportunities that developed during the preparation of the PEIS

  13. 76 FR 12096 - McCloud-Pit Project; Notice of Availability of the Final Environmental Impact Statement for the...

    Science.gov (United States)

    2011-03-04

    ... Project; Notice of Availability of the Final Environmental Impact Statement for the Mccloud-Pit... Pit Rivers in Shasta County, California and has prepared a final environmental impact statement (EIS... and the alternatives for relicensing the McCloud-Pit Project. The final EIS documents the views of...

  14. Resonating Statements: Discursive acts in IT projects

    DEFF Research Database (Denmark)

    Hjelholt, Morten; Jensen, Tina Blegind

    2015-01-01

    IT projects are often complex arrangements of technological components, social actions, and organizational transformation that are difficult to manage in practice. This paper takes an analytical discourse perspective to explore the process of legitimizing IT projects. We introduce the concept...... of resonating statements to highlight how central actors navigate in various discourses over time. Particularly, the statements and actions of an IT project manager are portrayed to show how individuals can legitimize actions by connecting statements to historically produced discourses. The case study...... of an IT project in a Danish local government spans a two-year time period and demonstrates a double-loop legitimization process. First, resonating statements are produced to localize a national IT initiative to support the specificity of a local government discourse. Second, the resonating statements are used...

  15. 40 CFR 1501.4 - Whether to prepare an environmental impact statement.

    Science.gov (United States)

    2010-07-01

    ... impact statement. 1501.4 Section 1501.4 Protection of Environment COUNCIL ON ENVIRONMENTAL QUALITY NEPA AND AGENCY PLANNING § 1501.4 Whether to prepare an environmental impact statement. In determining whether to prepare an environmental impact statement the Federal agency shall: (a) Determine under its...

  16. 76 FR 41816 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Ocotillo Sol Solar...

    Science.gov (United States)

    2011-07-15

    ...] Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Ocotillo Sol Solar Project... (ROW) authorization request for the Ocotillo Sol Solar Energy Facility (Project), a 15-18 megawatt (MW... Ocotillo Sol Solar Project by any of the following methods: Mail: Noel Ludwig, California Desert District...

  17. 76 FR 21003 - Notice of Intent To Prepare a Programmatic Environmental Impact Statement (EIS) and Possible Land...

    Science.gov (United States)

    2011-04-14

    ... Prepare a Programmatic Environmental Impact Statement (EIS) and Possible Land Use Plan Amendments for... to prepare a Programmatic EIS for Allocation of Oil Shale and Tar Sands Resources on Lands... through local media, newsletters, and the project Web site at: http://blm.gov/st5c . The minutes and list...

  18. Conceptual design statement of work for the immobilized low-activity waste disposal facility, project W-520

    International Nuclear Information System (INIS)

    Pickett, W.W.

    1998-01-01

    This Statement of Work outlines the deliverables and schedule for preparation of the Project W-520 Conceptual Design Report, including, work plans, site development plan, preliminary safety evaluation, and conceptual design

  19. 43 CFR 46.445 - Preparing a legislative environmental impact statement.

    Science.gov (United States)

    2010-10-01

    ... IMPLEMENTATION OF THE NATIONAL ENVIRONMENTAL POLICY ACT OF 1969 Environmental Impact Statements § 46.445 Preparing a legislative environmental impact statement. When required under 40 CFR 1506.8, the Department must ensure that a legislative environmental impact statement is included as a part of the formal...

  20. 77 FR 39322 - Notice to Rescind the Notice of Intent to Prepare an Environmental Impact Statement (EIS...

    Science.gov (United States)

    2012-07-02

    ... to Prepare an Environmental Impact Statement (EIS), Kootenai County, ID AGENCY: Federal Highway... Federal Highway Administration (FHWA), in cooperation with Idaho Transportation Department (ITD... because congestion and safety concerns were rising within the project corridor and travel times for local...

  1. 77 FR 59603 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Oregon LNG Export...

    Science.gov (United States)

    2012-09-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF12-18-000; Docket No. PF12-20-000] Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Oregon LNG Export Project and Washington Expansion Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings [[Page 59604

  2. 78 FR 57626 - Algonquin Gas Transmission, LLC; Notice of Intent To Prepare An Environmental Impact Statement...

    Science.gov (United States)

    2013-09-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF13-16-000] Algonquin Gas Transmission, LLC; Notice of Intent To Prepare An Environmental Impact Statement for the Planned Algonquin Incremental Market Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings The staff of the Federal Energy...

  3. 77 FR 56835 - Constitution Pipeline Company, LLC; Notice of Intent To Prepare an Environmental Impact Statement...

    Science.gov (United States)

    2012-09-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF12-9-000] Constitution Pipeline Company, LLC; Notice of Intent To Prepare an Environmental Impact Statement for the Planned Constitution Pipeline Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings The staff of the Federal Energy...

  4. 78 FR 32240 - Notice of Inent (NOI) To Prepare an Environmental Impact Statement (EIS) for the Oro Verde Solar...

    Science.gov (United States)

    2013-05-29

    ... DEPARTMENT OF DEFENSE Notice of Inent (NOI) To Prepare an Environmental Impact Statement (EIS) for the Oro Verde Solar Project at Edwards Air Force Base and County of Kern, CA AGENCY: Department of the... with the development of the Oro Verde Solar Project (OVSP) on Edwards AFB. The OVSP is a solar...

  5. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  6. 28 CFR 91.63 - Preparing an Environmental Impact Statement

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Preparing an Environmental Impact... CORRECTIONAL FACILITIES Environmental Impact Review Procedures for VOI/TIS Grant Program Environmental Review Procedures § 91.63 Preparing an Environmental Impact Statement (a) Initial determination. OJP will determine...

  7. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    1996-04-01

    The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes the potential impacts of four alternatives for conducting the Ground Water Project. One of these alternatives is the proposed action. These alternatives do not address site-specific ground water compliance strategies because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS differs substantially from a site-specific environmental impact statement because multiple ground water compliance strategies, each with its own set of potential impacts, could be used to implement all the alternatives except the no action alternative. In a traditional environmental impact statement, an impacts analysis leads directly to the defined alternatives. The impacts analysis for implementing alternatives in this PEIS first involves evaluating a ground water compliance strategy or strategies, the use of which will result in site-specific impacts. This PEIS impacts analysis assesses only the potential impacts of the various ground water compliance strategies, then relates them to the alternatives to provide a comparison of impacts.

  8. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    International Nuclear Information System (INIS)

    1996-04-01

    The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes the potential impacts of four alternatives for conducting the Ground Water Project. One of these alternatives is the proposed action. These alternatives do not address site-specific ground water compliance strategies because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS differs substantially from a site-specific environmental impact statement because multiple ground water compliance strategies, each with its own set of potential impacts, could be used to implement all the alternatives except the no action alternative. In a traditional environmental impact statement, an impacts analysis leads directly to the defined alternatives. The impacts analysis for implementing alternatives in this PEIS first involves evaluating a ground water compliance strategy or strategies, the use of which will result in site-specific impacts. This PEIS impacts analysis assesses only the potential impacts of the various ground water compliance strategies, then relates them to the alternatives to provide a comparison of impacts

  9. 77 FR 52108 - Notice of Withdrawal of the Notice of Intent To Prepare an Environmental Impact Statement (EIS...

    Science.gov (United States)

    2012-08-28

    ... Environmental Policy Act (NEPA) activities with the Bureau of Land Management as the Lead Agency to secure the... Intent To Prepare an Environmental Impact Statement (EIS) for the Proposed Sheep Mountain Parkway... Multimodal Transportation Project, which includes highway, transit, and non-motorized trail components in...

  10. Mission Need Statement: Idaho Spent Fuel Facility Project

    Energy Technology Data Exchange (ETDEWEB)

    Barbara Beller

    2007-09-01

    Approval is requested based on the information in this Mission Need Statement for The Department of Energy, Idaho Operations Office (DOE-ID) to develop a project in support of the mission established by the Office of Environmental Management to "complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government-sponsored nuclear energy research". DOE-ID requests approval to develop the Idaho Spent Fuel Facility Project that is required to implement the Department of Energy's decision for final disposition of spent nuclear fuel in the Geologic Repository at Yucca Mountain. The capability that is required to prepare Spent Nuclear Fuel for transportation and disposal outside the State of Idaho includes characterization, conditioning, packaging, onsite interim storage, and shipping cask loading to complete shipments by January 1,2035. These capabilities do not currently exist in Idaho.

  11. 76 FR 41815 - Notice of Intent To Prepare an Environmental Impact Statement for the enXco Development...

    Science.gov (United States)

    2011-07-15

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCAD0500, L51010000.LVRWB11B4500.FX0000] Notice of Intent To Prepare an Environmental Impact Statement for the enXco Development Corporation's Tylerhorse Wind Project, Kern County, CA, and Possible Land Use Plan Amendment; CACA 51561 AGENCY: Bureau of...

  12. Draft programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project

    International Nuclear Information System (INIS)

    1994-04-01

    The purpose of the UMTRA Ground Water Project is to protect human health and the environment by meeting the proposed EPA standards in areas where ground water has been contaminated. The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes potential impacts of four programmatic alternatives, including the proposed action. The alternatives do not address site-specific ground water compliance. Rather, the PEIS is a planning document that provides a framework for conducting the Ground Water Project; assesses the potential programmatic impacts of conducting the Ground Water Project; provides a method for determining the site-specific ground water compliance strategies; and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS differs substantially from a site-specific environmental impact statement because multiple ground water compliance strategies, each with its own unique set of potential impacts, could be used to implement all the alternatives except the no action alternative. Implementing a PEIS alternative means applying a ground water compliance strategy or strategies at a specific site. It is the use of a strategy or a combination of strategies that would result in site-specific impacts

  13. 77 FR 68764 - Parker Knoll Hydro, LLC; Notice of Intent To Prepare An Environmental Impact Statement and Notice...

    Science.gov (United States)

    2012-11-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13239-002] Parker Knoll Hydro, LLC; Notice of Intent To Prepare An Environmental Impact Statement and Notice of Scoping Meetings and Soliciting Scoping Comments Take notice that the following hydroelectric applications have been filed with Commission and are available for...

  14. 77 FR 64824 - Notice of Intent To Prepare an Environmental Impact Statement, a Possible Land Use Plan Amendment...

    Science.gov (United States)

    2012-10-23

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA 049584, L51010000.FX0000.LVRWB09B3130] Notice of Intent To Prepare an Environmental Impact Statement, a Possible Land Use Plan Amendment, and a Public Lands Segregation for the Proposed Soda Mountain Solar Project, CA AGENCY: Bureau of Land...

  15. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 2

    International Nuclear Information System (INIS)

    1996-10-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project is to eliminate, reduce, or address to acceptable levels the potential health and environmental consequences of milling activities. One of the first steps in the UMTRA Ground Water Project is the preparation of the Programmatic Environmental Impact Statement (PEIS). This report contains the comments and responses received on the draft PEIS

  16. 77 FR 13117 - Excelerate Energy L.P.; Notice of Intent To Prepare an Environmental Impact Statement for the...

    Science.gov (United States)

    2012-03-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF12-4-000] Excelerate Energy L.P.; Notice of Intent To Prepare an Environmental Impact Statement for the Planned Aguirre Offshore Gasport Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings The staff of the Federal Energy Regulatory...

  17. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project. Backgorund information

    International Nuclear Information System (INIS)

    1992-09-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  18. 76 FR 53531 - Environmental Impact Statement: Hancock County, MS

    Science.gov (United States)

    2011-08-26

    ...)] Environmental Impact Statement: Hancock County, MS AGENCY: Federal Highway Administration (FHWA), Department Of... that an environmental impact statement will be prepared for a proposed highway project in Hancock... an Environmental Impact Statement (EIS) for the proposed widening and/or realignment of State Route...

  19. 78 FR 75557 - CE FLNG, LLC, CE Pipeline, LLC; Notice of Intent To Prepare an Environmental Impact Statement for...

    Science.gov (United States)

    2013-12-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF13-11-000] CE FLNG, LLC, CE Pipeline, LLC; Notice of Intent To Prepare an Environmental Impact Statement for the Planned CE FLNG Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting The staff of the Federal Energy Regulatory Commission ...

  20. 78 FR 46677 - Environmental Impact Statement; Calcasieu Parish, LA

    Science.gov (United States)

    2013-08-01

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement...: The Federal Highway Administration is issuing this notice to advise the public that an Environmental Impact Statement (EIS) will be prepared for a proposed transportation project in Calcasieu Parish...

  1. 78 FR 69653 - Cancellation of the Notice of Intent To Prepare an Environmental Impact Statement for...

    Science.gov (United States)

    2013-11-20

    ... Environmental Impact Statement for Construction and Operation of an Outlying Landing Field To Support Carrier... Intent to Prepare an Environmental Impact Statement (EIS) for Construction and Operation of an Outlying... prepare an EIS to evaluate the potential environmental consequences of constructing and operating an OLF...

  2. Statement of John H. Anttonen, Project Manager, Basalt Waste Isolation Project, Richland Operations Office, Department of Energy

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    My name is John Anttonen and I am the Project Manager for the Basalt Waste Isolation Project (BWIP) at the Department of Energy Richland Operation Office. The responsibilities of may office are to manage the day-to-day activities of the site suitability investigations of the basalt formations at the Hanford Site, a Department complex that is involved in a variety of national missions, including defense materials production, nuclear energy research, and radioactive waste management. In may prepared comments today I would like to touch upon four specific subject areas relating to the BWIP program and then I would be happy to answer any questions you might have. The topics I will cover are: (1) historical aspects; (2) site specific technical issues and how they will be addressed during site characterization of the basalt site at Hanford; (3) current project status and; (4) institutional interaction. For clarity, I have attached several charts to my statement

  3. 75 FR 57548 - Environmental Impact Statement: U.S. 64/Corridor K. The Project Begins on U.S. 64 From West of...

    Science.gov (United States)

    2010-09-21

    ... that an Environmental Impact Statement (EIS) will be prepared for a proposed highway project in Polk County, Tennessee. FOR FURTHER INFORMATION CONTACT: Mr. Charles J. O'Neill, Planning and Program..., Suite 508, Nashville, Tennessee 37217, Telephone: (615) 781-5770, E-mail: Charles[email protected

  4. Bibliography of documents and related materials collected for the Hawaii Geothermal Project Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    Glenn, F.M.; Boston, C.R.; Burns, J.C.; Hagan, C.W. Jr.; Saulsbury, J.W.; Wolfe, A.K.

    1995-03-01

    This report has been prepared to make available and archive information developed during preparation of the Environmental Impact Statement for Phases 3 and 4 of the Hawaii Geothermal Project as defined by the state of Hawaii in its April 1989 proposal to Congress. On May 17, 1994, the USDOE published a notice in the Federal Register withdrawing its Notice of Intent of February 14, 1992, to prepare the HGP EIS. Since the state of Hawaii is no longer pursuing or planning to pursue the HGP, DOE considers the project to be terminated. This report provides a bibliography of documents, published papers, and other reference materials that were obtained or used. The report provides citations for approximately 642 documents, published papers, and other reference materials that were gathered to describe the potentially affected environment on the islands of Hawaii, Maui, and Oahu. The listing also does not include all the reference materials developed by support subcontractors and cooperating agencies who participated in the project. This listing does not include correspondence or other types of personal communications. The documents listed in this report can be obtained from original sources or libraries.

  5. 76 FR 21422 - Notice To Rescind a Notice of Intent to Prepare a Tiered Environmental Impact Statement

    Science.gov (United States)

    2011-04-15

    ... to Prepare a Tiered Environmental Impact Statement AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice to Rescind a Notice of Intent to Prepare a Tiered Environmental Impact Statement. SUMMARY... Heitmann, Environmental Specialist, Federal Highway Administration, New Mexico Division Office, 4001 Office...

  6. 45 CFR 640.5 - Responsibilities and procedures for preparation of an environmental impact statement.

    Science.gov (United States)

    2010-10-01

    ... an environmental impact statement. 640.5 Section 640.5 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION COMPLIANCE WITH THE NATIONAL ENVIRONMENTAL POLICY ACT § 640.5 Responsibilities and procedures for preparation of an environmental impact statement. (a) If...

  7. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    International Nuclear Information System (INIS)

    1996-10-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project is to eliminate, reduce, or address to acceptable levels the potential health and environmental consequences of milling activities by meeting Environmental Protection Agency (EPA) ground water standards. One of the first steps in the UMTRA Ground Water Project is the preparation of this Programmatic Environmental Impact Statement (PEIS). The EPA standards allow the use of different strategies for achieving compliance with the standards. This document analyzes the potential impacts of four alternatives for conducting the Ground Water Project. Each of the four alternatives evaluated in the PEIS is based on a different mix of strategies to meet EPA ground water standards. The PEIS is intended to serve as a programmatic planning document that provides an objective basis for determining site-specific ground water compliance strategies and data and information that can be used to prepare site-specific environmental impact analyses more efficiently. DOE will prepare appropriate further National Environmental Policy Act documentation before making site-specific decisions to implement the Ground Water Project. Affected States, Tribes, local government agencies, and members of the public have been involved in the process of preparing this PEIS; DOE encourages their continued participation in the site-specific decision making process

  8. 48 CFR 9.505-2 - Preparing specifications or work statements.

    Science.gov (United States)

    2010-10-01

    ... the development contractor has a competitive advantage, it is an unavoidable one that is not... furnishes complete specifications covering nondevelopmental items, to be used in a competitive acquisition... preparing, a work statement to be used in competitively acquiring a system or services—or provides material...

  9. 75 FR 430 - Notice of Intent To Prepare an Environmental Impact Statement for the Sigurd-Red Butte...

    Science.gov (United States)

    2010-01-05

    ...; UTU-83067] Notice of Intent To Prepare an Environmental Impact Statement for the Sigurd-Red Butte...) Cedar City Field Office, Cedar City, Utah, intends to prepare an Environmental Impact Statement (EIS... Fishlake National Forests), State of Utah, Millard County, Sevier County, Beaver County, Utah Division of...

  10. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Volume 1: Executive summary

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to comply with Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act to the US Army Engineer District, Alaska (Corps). The application initiated the review process for BPXA's proposed project to develop and produce oil and gas from the Northstar Unit. The National Environmental Policy Act (NEPA) requires preparation of an Environmental Impact Statement (EIS) prior to any federal action that may significantly affect the quality of the human environment. The EIS is intended to provide federal agencies with information about the consequences of a proposed project and to disclose that information to the public, soliciting their comments, prior to the agencies making decisions on the project

  11. 75 FR 4619 - Intent to Prepare an Environmental Impact Statement on Transportation Improvements Within the...

    Science.gov (United States)

    2010-01-28

    ... the constraints placed on it by RTA's financial capacities. Financial plans are suggesting that RTA... Impact Statement on Transportation Improvements Within the Blue-Line Corridor in Shaker Heights and... Transportation. ACTION: Notice of Intent to prepare an Environmental Impact Statement. SUMMARY: The Federal...

  12. 77 FR 68146 - Notice of Intent To Prepare an Environmental Impact Statement for the Paseo del Morro National...

    Science.gov (United States)

    2012-11-15

    ... Intent To Prepare an Environmental Impact Statement for the Paseo del Morro National Recreational Trail.... 4332) (2) (C), the National Park Service (NPS) will prepare an Environmental Impact Statement for the... San Juan, protect the historic walls of El Morro, encourage educational tourism within the area. The...

  13. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments

    Energy Technology Data Exchange (ETDEWEB)

    None

    1999-02-01

    This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).

  14. 77 FR 1080 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Copper Flat Mine...

    Science.gov (United States)

    2012-01-09

    ... District Office, Las Cruces, New Mexico, intends to prepare an Environmental Impact Statement (EIS) and by...] Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Copper Flat Mine Plan of...: In compliance with the National Environmental Policy Act (NEPA) of 1969, as amended, and the Federal...

  15. 75 FR 429 - Notice of Intent To Prepare an Environmental Impact Statement for the Vantage to Pomona Heights...

    Science.gov (United States)

    2010-01-05

    ...; HAG10-0008] Notice of Intent To Prepare an Environmental Impact Statement for the Vantage to Pomona... Yakima Training Center (YTC) intend to prepare an Environmental Impact Statement (EIS) for the Vantage to.... ADDRESSES: You may submit comments or resource information related to the Vantage to Pomona Heights 230 kV...

  16. 78 FR 29120 - Notice of Intent To Prepare an Environmental Impact Statement for the Main Operating Base 2 (MOB...

    Science.gov (United States)

    2013-05-17

    ... DEPARTMENT OF DEFENSE Notice of Intent To Prepare an Environmental Impact Statement for the Main... to advise the public of their intent to prepare an Environmental Impact Statement (EIS) for the Main... Main St., New Egypt, New Jersey. Tuesday, June 4, Township of Moon Municipal Building, 1000 Beaver...

  17. Implementation plan for the programmatic environmental impact statement for the Department of Energy UMTRA Ground Water Project

    International Nuclear Information System (INIS)

    1994-04-01

    Under the Uranium Mill Tailings Remedial Action (UMTRA) Project, the U.S. Department of Energy (DOE) is cleaning up contamination to protect human health and the environment at 24 inactive uranium processing sites located in 10 states. Five of the sites are either on or near Native American lands. The UMTRA Project is divided into two projects: Surface and Ground Water. On November 18, 1992, the DOE issued a notice of intent (57 FR 54374, 1992) to prepare a programmatic environmental impact statement (PEIS) for the UMTRA Ground Water Project. The PEIS will result in a record of decision that will determine how the UMTRA Ground Water Project will address ground water contamination resulting from milling operations at the UMTRA Project processing sites. DOE regulations (10 CFR section 1021.312) require that an implementation plan be prepared to provide guidance for preparing a PEIS and to record the results of the scoping process. This implementation plan describes and records the results of the PEIS scoping process; summarizes comments received and their disposition; describes the purpose of and need for agency action, the proposed action, and alternatives; lists alternatives considered and eliminated from review; identifies cooperating agencies, their roles, and responsibilities; provides a draft PEIS outline, which includes the planned PEIS scope and content (Attachment A); and provides a schedule for the PEIS process. This plan will be placed in the UMTRA Project libraries listed in Attachment B. The PEIS will identify and evaluate the potential impacts associated with alternatives for conducting the UMTRA Ground Water Project. The PEIS will not assess site-specific impacts; site-specific impacts must be analyzed in separate National Environmental Policy Act (NEPA) documents that will tier off the PEIS. This tiering process will streamline the preparation of site-specific NEPA documents

  18. Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water Project

    International Nuclear Information System (INIS)

    1993-09-01

    Public concern regarding the potential human health and environmental effects from uranium mill tailings led Congress to pass the Uranium Mill Tailings Radiation Control Act (UMTRCA) (Public Law 95-604) in 1978. In the UMTRCA, Congress acknowledged the potentially harmful health effects associated with uranium mill tailings at 24 abandoned uranium mill processing sites needing remedial action. Uranium processing activities at most of the 24 mill processing sites resulted in the formation of contaminated ground water beneath and, in some cases, downgradient of the sites. This contaminated ground water often has elevated levels of hazardous constituents such as uranium and nitrate. The purpose of the Ground Water Project is to protect human health and the environment by meeting EPA-proposed standards in areas where ground water has been contaminated with constituents from UMTRA Project sites. A major first step in the UMTRA Ground Water Project is the preparation of this Programmatic Environmental Impact Statement (PEIS). This document analyzes potential impacts of the alternatives, including the proposed action. These alternatives are programmatic in that they are plans for conducting the UMTRA Ground Water Project. The alternatives do not address site-specific ground water compliance. This PEIS is a planning document that will provide a framework for conducting the Ground Water Project; assess the potential programmatic and environmental impacts of conducting the UMTRA Ground Water Project; provide a method for determining the site-specific ground water compliance strategies; and provide data and information that can be used to prepare site-specific environmental impacts analyses documents more efficiently

  19. Draft environmental impact statement: KENETECH/PacifiCorp Windpower Project, Carbon County, Wyoming

    International Nuclear Information System (INIS)

    1995-01-01

    This Draft Environmental Impact Statement assesses the environmental consequences of a proposed windpower development project in Carbon County, between Arlington and Hanna, Wyoming. Public scoping commenced in January 1994. All issues raised during scoping and interdisciplinary team preparation of the analysis are addressed. The proposed project entails the erection of approximately 1,390 wind turbine generators and associated facilities (e.g., roads, substations, distribution and communications lines) by KENETECH Windpower, Inc. A 230-kV transmission line would be built by PacifiCorp, Inc. to connect a proposed substation on Foote Creek Rim near Arlington to the Miner's substation near Hanna. The proposed project would use standard procedures as currently employed by other right-of-way projects, plus additional project-specific and site-specific mitigation measures to ensure that project impacts are minimized on all important resources. Impacts to most resources would be negligible to moderate during the life-of-project. Potentially significant impacts resulting from the project include avian mortality; declining avian populations; threatened, endangered, candidate, and/or state sensitive species mortality and/or habitat loss; disturbance to nearby residents due to noise; changes in visual resources; disturbance of important Native American traditional sites; changes in plant community species composition due to snow redistribution; displacement of big game due to windfarm operation; and loss of sage grouse nesting habitat. The proposed project could also have numerous beneficial impacts including increased revenues generated by taxes, increased employment, and benefits derived from using a nonpolluting resource for electric power generation

  20. 75 FR 1650 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed HB Potash, LLC-“In...

    Science.gov (United States)

    2010-01-12

    ...) Carlsbad Field Office, Carlsbad, New Mexico, intends to prepare an Environmental Impact Statement (EIS) and...] Notice of Intent To Prepare an Environmental Impact Statement for the Proposed HB Potash, LLC--``In-Situ... Intent. SUMMARY: In compliance with the National Environmental Policy Act of 1969, as amended, (NEPA) and...

  1. 76 FR 75554 - Notice of Availability of the Draft Environmental Impact Statement for the Mount Hope Project...

    Science.gov (United States)

    2011-12-02

    ... Environmental Impact Statement for the Mount Hope Project, Eureka County, NV AGENCY: Bureau of Land Management... Impact Statement (EIS) for the Mount Hope Project and by this notice is announcing the opening of the... Mount Hope Project Draft EIS within 90 days following the date the Environmental Protection Agency...

  2. Resonating Statements

    DEFF Research Database (Denmark)

    Hjelholt, Morten; Jensen, Tina Blegind

    2015-01-01

    IT projects are often complex arrangements of technological components, social actions, and organizational transformation that are difficult to manage in practice. This paper takes an analytical discourse perspective to explore the process of legitimizing IT projects. We introduce the concept...... of resonating statements to highlight how central actors navigate in various discourses over time. Particularly, the statements and actions of an IT project manager are portrayed to show how individuals can legitimize actions by connecting statements to historically produced discourses. The case study...... as part of a feedback loop to re-attach the localized IT project to the broader national discourse. The paper concludes with reflections on how to actively build on resonating statements as a strategic resource for legitimizing IT projects...

  3. Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems.

  4. Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

  5. Resource contingency program - Oregon. Final environmental impact statement, Hermiston power project

    International Nuclear Information System (INIS)

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA's Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA's intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future

  6. Current status of implementation of IFRS in the preparation of financial statements of peruvian companies

    Directory of Open Access Journals (Sweden)

    Oscar Alfredo Diaz Becerra

    2010-12-01

    Full Text Available For investors and other users of financial information to be able to act with full transparency and reliability it is necessary, among other things, that it be prepared according to a regulatory framework that is based on international standards that in turn adapt to new requirements of the global economy. The high level of globalization of the world economy has led the International Financial Reporting Standards (IFRS to become the highest international standards applicable throughout the world and in the case of Peru, these standards have been made mandatory in preparing the financial statements of companies incorporated under the scope of the General Corporate law. Thus, the main purpose of this research , having an exploratory design, is ro have an initial approach on the compliance with the, implementation of IFRS in the preparation and presentation of financial statements of Peruvian companies that are not under the supervision of the National Supervisory Commission for Companies and Securities (CONASEV. To this end, first ít presents a general review of the theoretical framework of financial reporting and secondly, an analysis of the Peruvian Setting Accounting Standards related to the preparation and presentation of financial statements. The third part of this work presents and describes the methodological aspects used in the development of this research, for which it has developed a survey that includes eighteen closed questions and two open ended questions, structured according to our main and specific objectives of this research. The survey was distributed to a sample of companies selected from the universe defined in the research. The results are set out in the fourth section of the article, entitled, research results and which analyzes the responses to each of the survey questions. Finally, we present the conclusions and recommendations that can be reached, highlighting among the main ones, a high incidence of tax and legal aspects

  7. 78 FR 48713 - Notice of Availability of the Draft Environmental Impact Statement for the Ochoa Mine Project in...

    Science.gov (United States)

    2013-08-09

    ...] Notice of Availability of the Draft Environmental Impact Statement for the Ochoa Mine Project in Lea County, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability. SUMMARY... Draft Environmental Impact Statement (EIS) for the Ochoa Mine Project (Project) and by this notice is...

  8. 75 FR 51448 - Withdrawal of Notice for Preparation of an Environmental Impact Statement (EIS) for the Arkansas...

    Science.gov (United States)

    2010-08-20

    ... sustainable solutions for reducing head-cutting and scouring in the Ark-White Cutoff area. The two rivers are... Preparation of an Environmental Impact Statement (EIS) for the Arkansas White River Cutoff Study AGENCY... Impact Statement (EIS) for the Arkansas White River Cutoff Study. The original Notice of Intent (NOI) was...

  9. 75 FR 58369 - Intent To Prepare a Draft Environmental Impact Statement for the North Branch Ecorse Creek, Flood...

    Science.gov (United States)

    2010-09-24

    ... Draft EIS will address potential environmental impacts of the construction, operation, and maintenance... Environmental Impact Statement for the North Branch Ecorse Creek, Flood Risk Management General Reevaluation... Notice of Intent (NOI) to prepare a Draft Environmental Impact Statement (EIS) for flood risk management...

  10. Implementation Plan for the Hawaii Geothermal Project Environmental Impact Statement (DOE Review Draft:)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-09-18

    The US Department of Energy (DOE) is preparing an Environmental Impact Statement (EIS) that identifies and evaluates the environmental impacts associated with the proposed Hawaii Geothermal Project (HGP), as defined by the State of Hawaii in its 1990 proposal to Congress (DBED 1990). The location of the proposed project is shown in Figure 1.1. The EIS is being prepared pursuant to the requirements of the National Environmental Policy Act of 1969 (NEPA), as implemented by the President's Council on Environmental Quality (CEQ) regulations (40 CFR Parts 1500-1508) and the DOE NEPA Implementing Procedures (10 CFR 1021), effective May 26, 1992. The State's proposal for the four-phase HGP consists of (1) exploration and testing of the geothermal resource beneath the slopes of the active Kilauea volcano on the Island of Hawaii (Big Island), (2) demonstration of deep-water power cable technology in the Alenuihaha Channel between the Big Island and Mau, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands. DOE prepared appropriate NEPA documentation for separate federal actions related to Phase 1 and 2 research projects, which have been completed. This EIS will consider Phases 3 and 4, as well as reasonable alternatives to the HGP. Such alternatives include biomass coal, solar photovoltaic, wind energy, and construction and operation of commercial geothermal power production facilities on the Island of Hawaii (for exclusive use on the Big Island). In addition, the EIs will consider the reasonable alternatives among submarine cable technologies, geothermal extraction, production, and power generating technologies; pollution control technologies; overland and submarine power transmission routes; sites reasonably suited to

  11. Draft programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project

    International Nuclear Information System (INIS)

    1995-04-01

    The US Department of Energy (DOE) is responsible for performing remedial action to bring surface and ground water contaminant levels at 24 inactive uranium processing sites into compliance with the US Environmental Protection Agency (EPA) standards. DOE is accomplishing this through the Uranium Mill Tailings Remedial Action (UMTRA) Surface and Ground Water Projects. Remedial action will be conducted with the concurrence of the US Nuclear Regulatory Commission (NRC) and the full participation of affected states and Indian tribes. Uranium processing activities at most of 24 the inactive mill sites resulted in the contamination of ground water beneath and, in some cases, downgradient of the sites. This contaminated ground water often has elevated levels of constituents such as uranium and nitrate. The purpose of the UMTRA Ground Water Project is to eliminate, or reduce to acceptable levels, the potential health and the environmental consequences of milling activities by meeting the EPA standards in areas where ground water has been contaminated. The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes potential impacts of four programmatic alternatives, including the proposed action. The alternatives do not address site-specific ground water compliance strategies. Rather, the PEIS is a planning document that provides a framework for conducting the Ground Water Project; assesses the potential programmatic impacts of conducting the Ground Water Project; provides a method for determining the site-specific ground water compliance strategies; and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently

  12. 75 FR 80798 - Notice of Intent To Prepare a Programmatic Environmental Impact Statement (PEIS) for Land...

    Science.gov (United States)

    2010-12-23

    ... DEPARTMENT OF DEFENSE Department of the Army Notice of Intent To Prepare a Programmatic Environmental Impact Statement (PEIS) for Land Acquisition, South Texas Training Center (STTC), in McMullen... media sources. To ensure scoping comments are fully considered in the preparation of the PEIS, comments...

  13. 75 FR 41242 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed International...

    Science.gov (United States)

    2010-07-15

    ... NUCLEAR REGULATORY COMMISSION [NRC-2010-0143] Notice of Intent To Prepare an Environmental Impact... included an Environmental Report (ER) on December 30, 2009, that proposes the construction, operation, and... intent to prepare an Environmental Impact Statement (EIS) evaluating this proposed action. The EIS will...

  14. The utility of Pro Forma Income Statements.

    Science.gov (United States)

    Reiboldt, Max; Reiboldt, John

    2002-01-01

    Recent headlines surrounding the financial demise of the nation's seventh largest company, Enron, and its subsequent entanglements with its accounting and consulting firm, Arthur Andersen, have placed a cloud of suspicion upon many reasonable business practices that otherwise are considered standard procedure. The proforma income statement is one of those practices. An oft-used tool in financial management, pro formas play a useful role for projecting financial performance based on predictable forecasts or assumptions. Regardless of the current scrutiny, there is still a valid use for accurately prepared statements.

  15. 78 FR 49600 - Notice of Intent To Prepare an Environmental Impact Statement for the Virginia Beach Transit...

    Science.gov (United States)

    2013-08-14

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Notice of Intent To Prepare an Environmental Impact Statement for the Virginia Beach Transit Extension Study, Virginia AGENCY: Federal Transit... Federal Transit Administration (FTA) and Hampton Roads Transit (HRT) are planning to prepare an...

  16. 76 FR 19313 - Chequamegon-Nicolet National Forest, Wisconsin, Lakewood Southeast Project

    Science.gov (United States)

    2011-04-07

    ... stream bank improvement, forest age, forest composition, and stocking. DATES: Comments concerning the... Southeast Project AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an environmental impact statement. SUMMARY: The Forest Service will prepare an environmental impact statement (EIS) to document the...

  17. Preparation of environmental reports and impact statements for nuclear power plants

    International Nuclear Information System (INIS)

    Tsai, Y.H.

    1986-01-01

    Considerable first-hand experience has accumulated during the past decade in the United States regarding the preparation of environmental reports (ER) and environmental impact statements (EIS) for nuclear power plants. The US Nuclear Regulatory Commission (USNRC), which is responsible for regulating the construction and operation of nuclear power plants, is required under the National Environmental Policy Act to prepare an EIS for each plant. To obtain information essential to the EIS, the USNRC requires that each power company submit an ER. This paper focuses on the interrelationships of the two environmental documents and discusses the environmental review process and the environmental laws and regulations related to the licensing of nuclear power plants. It also describes the format and content, environmental issues, data requirements, and impact assessment methodologies for preparation of the ER and EIS. Problems associated with preparing the EIS are presented, with particular emphasis on the problems and methodologies associated with evaluating environmental costs and benefits

  18. 28 CFR 91.57 - Actions that normally require the preparation of an environmental impact statement.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Actions that normally require the preparation of an environmental impact statement. 91.57 Section 91.57 Judicial Administration DEPARTMENT OF... process. Environmental Review Procedures ...

  19. Preliminary final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    International Nuclear Information System (INIS)

    1996-01-01

    The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes the potential impacts of four alternative systems for conducting the ground water program. One of these systems is the proposed action. These alternatives do not address site-specific ground water compliance strategies, because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS presents multiple ground water compliance strategies, each with its own set of potential impacts, that could be used to implement all the alternatives presented in the PEIS except the no action alternative. The no action alternative must be considered by law. It consists of taking no action to meet EPA standards. Implementing all PEIS alternatives (except no action) means applying a ground water compliance strategy or a combination of strategies that would result in site-specific impacts

  20. AERA Statement on Use of Value-Added Models (VAM) for the Evaluation of Educators and Educator Preparation Programs

    Science.gov (United States)

    Educational Researcher, 2015

    2015-01-01

    The purpose of this statement is to inform those using or considering the use of value-added models (VAM) about their scientific and technical limitations in the evaluation of educators and programs that prepare teachers. The statement briefly reviews the background and current context of using VAM for evaluations, enumerates specific psychometric…

  1. Towards a global convergence of the conceptual framework for preparing financial statements

    Directory of Open Access Journals (Sweden)

    Mario Díaz Durand

    2010-06-01

    Full Text Available Due to the current globalization in business and investments that generate a highly interrelated business world, it is a must to have a common standard in accounting that brings transparency and the real use of information. According to that, this article presents a comparative analysis of the conceptual framework for the preparation and presentation of financial statements of the two important international accounting models of normative use: the accounting standards established by the FASB and the IASB. The conceptual framework provides a guideline to prepare and present financial statements and at the same time it is a basis for the enactment of international financial reporting standards. To this day, there are some convergence agreements on conceptual frameworks between FASB and IASB, in charge of producing standards, which implies joint work in relation to their respective frameworks, with the purpose of developing a better conceptual framework, common for both institutions. With respect to this, in the article we can find proposals and reflections related to the convergence of conceptual frameworks, in order to enable the feasibility of a convergent framework as an important document in the revision and the issuance process of future international financial reporting standards.

  2. The National Environmental Policy Act and DOE's programmatic environmental impact statement

    International Nuclear Information System (INIS)

    Wisenbaker, W.E.

    1991-01-01

    The National Environmental Policy Act (NEPA) of 1969 requires that all agencies of the federal government prepare a detailed statement on any action significantly affecting the quality of the human environment. Such a statement must include the environmental impact of the proposed action, any adverse environmental effects that cannot be avoided should the proposed action be implemented, and alternatives to the proposed action. In requiring environmental statements, NEPA encourages viewing related actions collectively and looking at cumulative impacts. A programmatic environmental impact statement (PEIS) is a broad environmental analysis of a program or policy prepared when actions are connected and may have cumulative environmental impacts. The PEIS benefits include providing input into an agency's planning and decision making, assessing potential environmental consequences of a wide range of alternatives before options have been foreclosed, and allowing consideration of systemwide impacts of various alternatives early in the decision-making process. The US Department of Energy (DOE) will prepare its PEIS on Environmental Restoration and Waste Management program. The PEIS will consider programmatic issues and integrated approaches to the program; address national, program-wide alternatives rather than site-specific actions; and provide for subsequent NEPA documents of narrower scope to be prepared to address site-specific or project-specific actions

  3. Environmental impact statements: Nuclear-industry waste-disposal and isotope-separation projects. (Latest citations from the NTIS data base). Published Search

    Energy Technology Data Exchange (ETDEWEB)

    1992-04-01

    The bibliography contains citations concerning draft and final impact statements relating to environmental radiation hazards. Prepared by the Department of Energy (DOE), Nuclear Regulatory Commission, Oak Ridge National Laboratory, and others, these reports examine environmental data affecting DOE decisions on proposed construction and decommissioning of nuclear power plants, radioactive waste disposal facilities and sites, and isotope separation projects. The effects of Federal guidelines and atomic facility location on community awareness is briefly mentioned. (Contains a minimum of 120 citations and includes a subject term index and title list.)

  4. THE STATEMENT OF CASH FLOWS USING FINANCIAL STATEMENT EQUATIONS

    OpenAIRE

    Harold Fletcher; Thomas Ulrich

    2010-01-01

    This paper addresses one of the more difficult topics in teaching MBA level financial management, the statement of cash flows. By employing financial statement equations in preparing the statement of cash flows, students: (1) are employing tools that they are more familiar and comfortable with which mitigates their anxiety and enhances their understanding, (2) are better able to understand the logic of the statement of cash flows and the relationships that exist between it and the income stat...

  5. 76 FR 67178 - Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement...

    Science.gov (United States)

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2149-152] Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement for the Wells... application for license for the Wells Hydroelectric Project (FERC No. 2149), located on the Columbia River in...

  6. 76 FR 55890 - Cancellation of Supplemental Environmental Impact Statement for Ancillary Facilities for the...

    Science.gov (United States)

    2011-09-09

    ... (SPR). In April 2011, Congress rescinded all funding for the SPR expansion project. FOR FURTHER... included no new funding to continue SPR expansion efforts and proposed cancellation of previously... expansion project, DOE prepared an environmental impact statement for the Site Selection for the Expansion...

  7. 75 FR 69398 - Notice of Intent To Prepare a Programmatic Environmental Impact Statement on Implementing...

    Science.gov (United States)

    2010-11-12

    ... process for this action may be submitted by: Mail: National Marine Fisheries Service, Pacific Islands... Intent To Prepare a Programmatic Environmental Impact Statement on Implementing Recovery Actions for Hawaiian Monk Seals AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric...

  8. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Volume 2: Chapters 1 through 4

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska (Corps) to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. The Corps determined that issuance of a permit for BPXA's proposed project constituted a major federal action that may significant affect the quality of the human environment pursuant to the National Environmental Policy Act (NEPA). In addition, the US Environmental Protection Agency (EPA), upon review of BPXA's permit application, determined under provisions of the Clean Water Act and 40 CFR Part 6 Subpart F that permitting for BPXA's proposed project constituted a major federal action that may significantly affect the quality of the human environment. As a result, preparation of an Environmental Impact Statement (EIS) under NEPA was undertaken to identify and evaluate a range of reasonable alternatives and evaluate the potential effects the alternatives, including BPXA's proposed project, may have on the human environment

  9. Presentation of Consolidated Statement of Cash Flows under IAS 7, Statement of Cash Flows

    OpenAIRE

    Calota Traian-Ovidiu; Tănase Alin-Eliodor

    2013-01-01

    The consolidated financial statements must includ a specific statement, regarding cash flows from all activities of the entity, called „consolidated statement of cash flow”. Information for preparing cash flow statements can be found in all other components of the financial statements, such as financial position, statement of comprehensive income and statement of changes in equity. The cash flow statement shall report cash flows during the period classified by operating, investing and financi...

  10. 75 FR 20379 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Hollister...

    Science.gov (United States)

    2010-04-19

    ... exploration. The full-scale project would augment the existing mine water management facilities that currently include a reverse-osmosis and desilting water treatment plant and rapid infiltration basins by adding... Statement for the Proposed Hollister Underground Mine Project, Elko County, NV AGENCY: Bureau of Land...

  11. 78 FR 6303 - Notice of Intent To Prepare a Supplemental Draft Environmental Impact Statement on the Effects of...

    Science.gov (United States)

    2013-01-30

    ..., 2010, NMFS, as lead agency, announced its intent to prepare an EIS analyzing the impacts to the human... Intent To Prepare a Supplemental Draft Environmental Impact Statement on the Effects of Oil and Gas Activities in the Arctic Ocean AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and...

  12. 75 FR 7515 - Notice of Availability of the Draft Environmental Impact Statement/Staff Assessment for the...

    Science.gov (United States)

    2010-02-19

    ... Stirling Energy Systems Solar Two Project and Possible California Desert Conservation Area Plan Amendment... Commission (CEC) have prepared a Draft Environmental Impact Statement (EIS), Draft California Desert... impacts of the proposed Solar Two Project on air quality, biological resources, cultural resources, water...

  13. 76 FR 49785 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Samish Indian...

    Science.gov (United States)

    2011-08-11

    ... Impact Statement for the Proposed Samish Indian Nation Fee-to-Trust Acquisition and Casino Project... 11.41-acre fee-to-trust transfer and casino project to be located in Anacortes, Washington. The... Casino Project'' on the first page of your written comments. The public scoping meeting will be held at...

  14. Mirror Confinement Systems: project summaries

    International Nuclear Information System (INIS)

    1980-07-01

    This report contains descriptions of the projects supported by the Mirror Confinement Systems (MCS) Division of the Office of Fusion Energy. The individual project summaries were prepared by the principal investigators, in collaboration with MCS staff office, and include objectives and milestones for each project. In addition to project summaries, statements of Division objectives and budget summaries are also provided

  15. 75 FR 73059 - Record of Decision and Floodplain Statement of Findings for the Cushman Hydroelectric Project...

    Science.gov (United States)

    2010-11-29

    ... Floodplain Statement of Findings for the Cushman Hydroelectric Project, Mason County, Washington... Project in Mason County, Washington. These components include a new 3.6 megawatt (MW) powerhouse on the... components of the Cushman Hydroelectric Project in Mason County, Washington. These components include a new 3...

  16. 7 CFR 3052.310 - Financial statements.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Financial statements. 3052.310 Section 3052.310....310 Financial statements. (a) Financial statements. The auditee shall prepare financial statements... appropriate, cash flows for the fiscal year audited. The financial statements shall be for the same...

  17. 77 FR 26025 - Notice of Intent To Prepare a Environmental Impact Statement (EIS) for the HOPE SF Development at...

    Science.gov (United States)

    2012-05-02

    ... a Environmental Impact Statement (EIS) for the HOPE SF Development at Potrero Terrace and Potrero... Statement (EIR/EIS) for the HOPE SF Development at the Potrero Terrace and Potrero Annex Public Housing Development (Potrero HOPE SF Master Plan Project). The EIR/EIS will be a joint National Environmental Policy...

  18. Recommendations for the Preparation of Environmental Assessments and Environmental Impact Statements, 2nd edition

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2004-12-01

    This document provides recommendations for the Department of Energy’s (DOE’s) preparation of environmental assessments and environmental impact statements under the National Environmental Policy Act of 1969 (NEPA). The Office of NEPA Policy and Compliance prepared these recommendations in consultation with the Office of the Assistant General Counsel for Environment and following coordination with the DOE NEPA Community. The recommendations should materially aid those responsible for preparing and reviewing NEPA documents to focus on significant environmental issues, adequately analyze environmental impacts, and effectively present the analysis to decisionmakers and the public. The recommendations are not all-encompassing, however; preparers must apply independent judgment to determine the appropriate scope and analytical requirements of NEPA for each proposal. These recommendations do not constitute legal requirements, but are intended to enhance compliance with existing NEPA regulations (40 CFR Parts 1500-1508, 10 CFR Part 1021).

  19. 7 CFR 1212.51 - Financial statements.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Financial statements. 1212.51 Section 1212.51... statements. (a) The Board shall prepare and submit financial statements to the Department on a periodic basis. Each such financial statement shall include, but not be limited to, a balance sheet, income statement...

  20. Financial Statement Math

    OpenAIRE

    2007-01-01

    game tool Game Tool Interactive Media Element The purpose of this interactive exercise is to help you understand the math in the income statement and balance sheet., Give the proper mathematical computations in order to correctly prepare the income statement and the balance sheet.The exercise is divided into 3 parts: The income Statement, The Balance Sheet - Assets, The Balance Sheet - Liabilities, GB3050 Financial Reporting and Analysis

  1. 76 FR 336 - Intent To Prepare a Supplemental Environmental Impact Statement (SEIS) for PacRim Coal's Proposed...

    Science.gov (United States)

    2011-01-04

    ... Environmental Impact Statement (SEIS) for PacRim Coal's Proposed Chuitna Coal Project AGENCY: U.S. Army Corps of... Chuitna Coal Project. It is anticipated that the Environmental Protection Agency (EPA), the Native Village... the Alaska Surface Coal Mining Control and Reclamation Act (ASCMCRA) permit, which governs all aspects...

  2. 76 FR 34211 - Intent To Prepare a Draft Environmental Impact Statement for the Proposed Kennecott Utah Copper...

    Science.gov (United States)

    2011-06-13

    ... Environmental Impact Statement for the Proposed Kennecott Utah Copper LLC Tailings Expansion Project, Near Magna... Copper Tailings Expansion Project, an expansion of an active commercial mining operation near Magna, Salt Lake County, UT. Kennecott Utah Copper LLC (KUC) has applied for a Department of the Army (DA) permit...

  3. 38 CFR 41.310 - Financial statements.

    Science.gov (United States)

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Financial statements. 41...) AUDITS OF STATES, LOCAL GOVERNMENTS, AND NON-PROFIT ORGANIZATIONS Auditees § 41.310 Financial statements. (a) Financial statements. The auditee shall prepare financial statements that reflect its financial...

  4. Quality improvement primer part 1: Preparing for a quality improvement project in the emergency department.

    Science.gov (United States)

    Chartier, Lucas B; Cheng, Amy H Y; Stang, Antonia S; Vaillancourt, Samuel

    2018-01-01

    Emergency medicine (EM) providers work in a fast-paced and often hectic environment that has a high risk for patient safety incidents and gaps in the quality of care. These challenges have resulted in opportunities for frontline EM providers to play a role in quality improvement (QI) projects. QI has developed into a mature field with methodologies that can dramatically improve the odds of having a successful project with a sustainable impact. However, this expertise is not yet commonly taught during professional training. In this first of three articles meant as a QI primer for EM clinicians, we will introduce QI methodology and strategic planning using a fictional case study as an example. We will review how to identify a QI problem, define components of an effective problem statement, and identify stakeholders and core change team members. We will also describe three techniques used to perform root cause analyses-Ishikawa diagrams, Pareto charts and process mapping-and how they relate to preparing for a QI project. The next two papers in this series will focus on the execution of the QI project itself using rapid-cycle testing and on the evaluation and sustainability of QI projects.

  5. 78 FR 756 - Notice of Availability of the Draft Environmental Impact Statement for the Proposed Vantage...

    Science.gov (United States)

    2013-01-04

    ... Vantage-Pomona Heights 230kV Transmission Line Project in Yakima, Grant, Benton, and Kittitas Counties, WA...) has prepared a Draft Environmental Impact Statement (EIS) for the Vantage- Pomona Heights 230kV... submit comments related to the Vantage-Pomona Heights 230kV Transmission Line Project by any of the...

  6. 77 FR 70460 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Ho-Chunk Nation...

    Science.gov (United States)

    2012-11-26

    ... Impact Statement for the Proposed Ho-Chunk Nation Beloit Casino Project, City of Beloit, Rock County, WI...) application for a proposed 33-acre fee-to-trust transfer and casino project to be located in the City of... address, and ``DEIS Scoping Comments, Ho-Chunk Nation Beloit Casino Project'' on the first page of your...

  7. 7 CFR 1206.41 - Financial statements.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Financial statements. 1206.41 Section 1206.41... Financial statements. (a) As requested by the Department, the Board shall prepare and submit financial statements to the Department on a periodic basis. Each such financial statement shall include, but not be...

  8. FEATURES OF CONSOLIDATED FINANCIAL STATEMENTS: FOREIGN EXPERIENCE

    Directory of Open Access Journals (Sweden)

    S. V. KUCHER

    2016-12-01

    Full Text Available The article researches the features of preparation and submission of the consolidated financial statements of the world countries of different systems of accounting standardization in order to identify the areas of accounting improvement for the process of consolidation of financial reporting indicators. The main problems of consolidated financial statements preparation by business entities in Ukraine are determined. The author determines the theoretical and practical problems of consolidation of financial statements of organizational and methodical character. The comparative analysis of the features of standardization process of financial statements consolidation in the world countries is carried out. The main differences in the requirements for the formation of consolidated financial statements indicators of such countries as the French Republic, the Federal Republic of Germany, the Republic of Belarus and the People’s Republic of China are outlined. The main directions of scientific researches on the improvement of accounting and analytical support for the preparation of consolidated financial statements are formed.

  9. 78 FR 59414 - Environmental Impact Statement; King County, Washington

    Science.gov (United States)

    2013-09-26

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement; King... prepare an environmental impact statement. SUMMARY: The Federal Highway Administration is issuing this notice to advise the public that an Environmental Impact Statement (EIS) will be prepared for a proposed...

  10. 77 FR 20690 - Environmental Impact Statement: Albuquerque, New Mexico

    Science.gov (United States)

    2012-04-05

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement.... SUMMARY: The FHWA is rescinding the notice of intent to prepare an environmental impact statement for the... rescinding the Notice of Intent to prepare an Environmental Impact Statement (EIS) for the proposed...

  11. 75 FR 70348 - Notice of Availability of the Draft Environmental Impact Statement for a Proposed Project in...

    Science.gov (United States)

    2010-11-17

    ... Environmental Impact Statement for a Proposed Project in Mariposa County, CA AGENCY: Federal Highway... Restoration Project in Mariposa County, California. DATES: Public circulation of this document will begin on... project on Wednesday, December 8, 2010 between 4 p.m. and 7 p.m. in Mariposa. The location is Mariposa...

  12. 78 FR 59712 - Notice of Availability of the Draft Environmental Impact Statement for the 3 Bars Ecosystem and...

    Science.gov (United States)

    2013-09-27

    ... Ecosystem and Landscape Restoration Project in Eureka County, NV AGENCY: Bureau of Land Management, Interior..., has prepared a Draft Environmental Impact Statement (EIS) for the 3 Bars Ecosystem and Landscape...

  13. 7 CFR 1218.51 - Financial statements.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Financial statements. 1218.51 Section 1218.51... § 1218.51 Financial statements. (a) As requested by the Secretary, the Council shall prepare and submit financial statements to the Secretary on a periodic basis. Each such financial statement shall include, but...

  14. 78 FR 13082 - Draft Environmental Impact Report/Environmental Impact Statement/Environmental Impact Statement...

    Science.gov (United States)

    2013-02-26

    ...The Bureau of Reclamation has made available for public review and comment the draft Environmental Impact Report/Environmental Impact Statement/Environmental Impact Statement (EIR/EIS/EIS) for the Upper Truckee River Restoration and Marsh Restoration Project (Project). The California Tahoe Conservancy and the Tahoe Regional Planning Agency, the other lead agencies for the Project, made the EIR/EIS/EIS available to the public on February 8, 2013.

  15. 75 FR 67391 - Notice of Intent To Prepare a Draft Environmental Impact Statement for the West Coast Recycling...

    Science.gov (United States)

    2010-11-02

    ... a Draft Environmental Impact Statement for the West Coast Recycling Group Project in West Sacramento... (EIS/EIR) for the development of the West Coast Recycling Group project located at the Port of West... meeting date. SUPPLEMENTARY INFORMATION: Description of the Proposed Action The West Coast Recycling Group...

  16. Corporate Information Management Financial Statements

    National Research Council Canada - National Science Library

    Gimble, Thomas

    1995-01-01

    The audit objective was to determine whether the OASD(C31) methods for preparing FY 1996 CIM, general purpose financial statements will result in auditable and complete general purpose financial statements...

  17. 77 FR 11086 - Revised Notice of Intent To Prepare a Draft Environmental Impact Statement for the Brunswick...

    Science.gov (United States)

    2012-02-24

    ... evaluate the impacts of the proposed CSDR alternatives to reduce coastal storm damages from beach erosion... Prepare a Draft Environmental Impact Statement for the Brunswick County Beaches, NC, Coastal Storm Damage... conducting a General Reevaluation Report (GRR) for the Brunswick County Beaches, NC, Coastal Storm Damage...

  18. CONSOLIDATED FINANCIAL STATEMENTS UNDER IFRS

    OpenAIRE

    Tănase Alin-Eliodor; Calotă Traian-Ovidiu

    2013-01-01

    This article is focuses on accounting consolidation techniques and the preparation of consolidation worksheets for the components of financial statements (statement of comprehensive income, statement of changes in equity, and financial position). The presented group includes parent company, two subsidiaries (only one fully controlled by the parent company) and a jointly controlled entity. The financial statements are presented under the following standards IFRS 3 Business Combination, IAS 27 ...

  19. 7 CFR 1230.115 - Submission of annual financial statements.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Submission of annual financial statements. 1230.115... Submission of annual financial statements. State Pork Producer Associations, as defined in § 1230.25, that... financial statements prepared by State association staff members or individuals who prepare annual financial...

  20. The Interim Financial Statements: The Case of Greece

    OpenAIRE

    Rogdaki, E.I.; Kazantzis, Ch.

    1999-01-01

    The following paper refers to the accounting and auditing issues which emerge in the preparation of the interim financial statements of the companies: Firstly, the interim financial statements are defined as being the financial statements that provide useful information about the financial position and the financial results of a company which are realized and accrued during the fiscal year. The interim financial statements can be prepared on a monthly basis, on a quarterly basis or covering a...

  1. 76 FR 54529 - Notice To Rescind a Notice of Intent To Prepare an Environmental Impact Statement: San Francisco...

    Science.gov (United States)

    2011-09-01

    ..., Acting Director, Local Programs, Federal Highway Administration, Sacramento, CA. [FR Doc. 2011-22349... To Prepare an Environmental Impact Statement: San Francisco County, CA AGENCY: Federal Highway..., Oakland, California 94623-0660, Telephone: (510) 286-5231, E-mail: [email protected]ca.gov...

  2. Consolidated financial statements for fiscal year 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    The following overview and accompanying audited financial statements have been prepared for Fiscal Year (FY) 1996 to report the financial position and the results of operations of the Department of Energy. These statements include the consolidated Statement of Financial Position and the consolidated Statement of Operations and Changes in Net Position. The statements have been prepared in accordance with the Office of Management and Budget Bulletin No. 94-01, Form and Content for Agency Financial Statements, and were developed in accordance with the hierarchy of accounting standards described therein. The overview provides a narrative on the Department of Energy`s mission, activities, and accomplishments. Utilizing performance measures as the primary vehicle for communicating Departmental accomplishments and results, this overview discusses the most significant measures while others are discussed in the supplemental information to the financial statements.

  3. 46 CFR 504.7 - Environmental impact statements.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 9 2010-10-01 2010-10-01 false Environmental impact statements. 504.7 Section 504.7... POLICY ANALYSIS § 504.7 Environmental impact statements. (a) General. (1) An environmental impact... environmental impact statements. (1) A draft environmental impact statement (DEIS) will initially be prepared in...

  4. 22 CFR 216.7 - Environmental impact statements.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Environmental impact statements. 216.7 Section... Environmental impact statements. (a) Applicability. An Environmental Impact Statement shall be prepared when... Environmental Impact Statement relating to paragraph (a)(2) of this section shall comply with the CEQ...

  5. 75 FR 5803 - Intent To Prepare an Environmental Impact Statement for the New Merced Wild and Scenic River...

    Science.gov (United States)

    2010-02-04

    ... DEPARTMENT OF THE INTERIOR National Park Service Intent To Prepare an Environmental Impact Statement for the New Merced Wild and Scenic River Comprehensive Management Plan Yosemite National Park, Mariposa and Madera Counties, CA ACTION: Notice of second extension of public scoping period. SUMMARY...

  6. Cone-beam CT in paediatric dentistry. DIMITRA project position statement

    International Nuclear Information System (INIS)

    Oenning, Anne Caroline; Jacobs, Reinhilde; Pauwels, Ruben; Stratis, Andreas; Hedesiu, Mihaela; Salmon, Benjamin

    2018-01-01

    DIMITRA (dentomaxillofacial paediatric imaging: an investigation towards low-dose radiation induced risks) is a European multicenter and multidisciplinary project focused on optimizing cone-beam CT exposures for children and adolescents. With increasing use of cone-beam CT for dentomaxillofacial diagnostics, concern arises regarding radiation risks associated with this imaging modality, especially for children. Research evidence concerning cone-beam CT indications in children remains limited, while reports mention inconsistent recommendations for dose reduction. Furthermore, there is no paper using the combined and integrated information on the required indication-oriented image quality and the related patient dose levels. In this paper, therefore, the authors initiate an integrated approach based on current evidence regarding image quality and dose, together with the expertise of DIMITRA's members searching for a state of the art. The aim of this DIMITRA position statement is to provide indication-oriented and patient-specific recommendations regarding the main cone-beam CT applications in the pediatric field. The authors will review this position statement document when results regarding multidisciplinary approaches evolve, in a period of 5 years or earlier. (orig.)

  7. Environmental impact statements: an analysis of six years' experience by seventy federal agencies

    International Nuclear Information System (INIS)

    1976-03-01

    This report assesses federal implementation of the environmental impact statement requirement of the National Environmental Policy Act. The report asks how well the requirement fulfills its purpose of helping government officials reach informed decisions. It considers whether the content and quality of impact statements are adequate; whether complaints about delay from EIS procedures are justified; what purposes may be served by preparing impact statements on broad government programs or groups of projects; whether EIS review by state as well as federal agencies is working well or is in need of improvement; and whether public involvement in the whole process is satisfactory. It also examines some other special questions arising from the EIS requirement

  8. 76 FR 13017 - Environmental Impact Statement: Los Angeles County, CA

    Science.gov (United States)

    2011-03-09

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement: Los... to advise the public that a Draft Environmental Impact Statement will be prepared for a proposed... prepare a Draft Environmental Impact Statement on a proposal for the State Route 710 Gap North Closure...

  9. Standard guide for preparing and interpreting precision and bias statements in test method standards used in the nuclear industry

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    1992-01-01

    1.1 This guide covers terminology useful for the preparation and interpretation of precision and bias statements. 1.2 In formulating precision and bias statements, it is important to understand the statistical concepts involved and to identify the major sources of variation that affect results. Appendix X1 provides a brief summary of these concepts. 1.3 To illustrate the statistical concepts and to demonstrate some sources of variation, a hypothetical data set has been analyzed in Appendix X2. Reference to this example is made throughout this guide. 1.4 It is difficult and at times impossible to ship nuclear materials for interlaboratory testing. Thus, precision statements for test methods relating to nuclear materials will ordinarily reflect only within-laboratory variation.

  10. 75 FR 47059 - Notice To Rescind Notice of Intent To Prepare an Environmental Impact Statement: Warren County, IA

    Science.gov (United States)

    2010-08-04

    ... Prepare an Environmental Impact Statement: Warren County, IA AGENCY: Federal Highway Administration (FHWA... Realty Manager, FHWA Iowa Division Office, 105 Sixth Street, Ames, IA 50010, Phone 515-233-7302; or James... Lincoln Way, Ames, IA 50010, Phone 515-239-1798. SUPPLEMENTARY INFORMATION: Electronic Access An...

  11. 78 FR 8189 - Notice of Intent To Prepare an Environmental Impact Statement for Personal Watercraft Use at Gulf...

    Science.gov (United States)

    2013-02-05

    ... Intent To Prepare an Environmental Impact Statement for Personal Watercraft Use at Gulf Islands National... the impacts of Personal Watercraft (PWC) use at Gulf Islands National Seashore (GUIS). Personal... legislation establishing that park, the park's resources and values, other visitor uses of the area, and...

  12. 77 FR 17036 - Revised Notice of Intent To Prepare a Draft Environmental Impact Statement for the Bogue Banks...

    Science.gov (United States)

    2012-03-23

    ... alternatives to reduce coastal storm damages from beach erosion on Bogue Banks North Carolina. The Bogue Banks... Prepare a Draft Environmental Impact Statement for the Bogue Banks Coastal Storm Damage Reduction... shoreline, causing damage to structures and environmental resources. The proposed Bogue Banks Coastal Storm...

  13. 7 CFR 1209.239 - Financial statements.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Financial statements. 1209.239 Section 1209.239..., AND CONSUMER INFORMATION ORDER Rules and Regulations General § 1209.239 Financial statements. (a) As requested by the Secretary, the Council shall prepare and submit financial statements to the Secretary on a...

  14. Measuring financial performance: an overview of financial statements.

    Science.gov (United States)

    Dalsted, N L

    1995-07-01

    Financial management has emerged as a critical component in the long-term viability of today's ranches and farms. Proper and timely financial reporting and analysis of financial statements are valuable tools that agricultural producers can use to monitor, coordinate, and plan their operational production and marketing schemes and strategies. A side note to preparation of financial statements. With the concerns over lender liability issues associated with statements either assisted with or prepared by a lending officer, agricultural producers will be responsible for preparing their own statements. The lending institutions may prepare their own statements in their assessment of the financial condition of a business and or individual, but, ultimately, the responsibility of financial statements is the borrower's. Some of the material presented in this article provides important input for use in such analytical programs as the National Cattlemen's Association, Integrated Resource Committees, and Standard Performance Analysis (SPA). SPA techniques and associated software have been or currently are under development for cow-calf, stocker, seedstock, and sheep enterprises. Critical to the analysis is having complete and correct financial statements. These analytical programs build on the financial statements. These analytical programs build on the financial statements as recommended by the FFSTF. Proper financial reporting is critical not only to a SPA assessment but also to the overall financial management of today's farms and ranches. Recognizing the importance of financial management in production agriculture is not enough, taking a proactive stance in one's financial plan is paramount to success. Failure to do so will only enhance the exit rates of producers from production agriculture.

  15. Fundamentals of Financial Statements Audit

    OpenAIRE

    World Bank

    2011-01-01

    The purpose of an audit is to enhance the degree of confidence of intended users in the financial statements. The objective of an audit of financial statements is to enable an auditor to express an opinion as to whether the financial statements are prepared, in all material respects, in accordance with International Financial Reporting Standards or another identified financial reporting fr...

  16. Notice of availability, final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project

    International Nuclear Information System (INIS)

    1999-01-01

    BP Exploration (Alaska) Inc. (BPXA) is proposing to develop the Northstar Unit, located approximately 6 miles offshore of Point Storkensen in the Alaskan Beaufort Sea. BPXA's proposed action is a self-contained development/production facility located on a reconstructed gravel island in 39 feet of water. Also proposed is construction of two buried subsea pipelines between the island and shoreline to transport oil and gas. The pipelines would connect with onshore facilities and the Trans Alaska Pipeline System (TAPS). In response to BPXA's submittal of a permit application under Section 10 of the Rivers and Harbors Act, Section 404 of the Clean Water Act, and Section 103 of the Marine Protection Research and Sanctuaries Act, the US Army Corps of engineers, Alaska District (Corps) determined that issuance of a permit for BPXA's proposed project constituted a major federal action that may significantly affect the quality of the human environment pursuant to the National Environmental Policy Act (NEPA). In addition, the US Environmental Protection Agency (EPA), determined under provisions of the Clean Water Act and 40 CFR Part 6 Subpart F that permitting by the EPA for BPXA's proposed project also constituted a major federal action that my significantly affect the quality of the human environment. As a result, preparation of an Environmental Impact Statement (EIS) under NEPA was undertaken to identify and evaluate a range of reasonable alternatives and evaluate the potential effects the alternates, including BPXA's proposed project, may have on the human environment

  17. 77 FR 25781 - Environmental Impact Statement; Washington, DC

    Science.gov (United States)

    2012-05-01

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement... Columbia, Department of Transportation. ACTION: Notice of Intent to Prepare a Draft Environmental Impact... agencies and the public that a Draft Environmental Impact Statement (DEIS) will be prepared to assess the...

  18. Interdisciplinary environmental impact statement examinations with parallel licensing procedures

    International Nuclear Information System (INIS)

    Gassner, E.

    1990-01-01

    The article investigates the question how the interdisciplinary, collective, integrative environmental impact statement can predominate the decisions in individual licensing procedures. It illustrates the requirements of the Act on Environmental Impact Statements. According to this Act, measures are to be found which deal with the overall complex, i.e. the entire system. In the article, the monitoring project organization's primary responsibility is emphasized: Analysis and prognosis of a project's environmental impacts are transferred to this organization for decision-preparation. Subsequent corrections or supplementations during the official approval procedure, or incorporation of the public through the authorities, do not change the matter. An all-comprehensive assessment must be based on all-comprehensive standards. From the point of view of immissions this is minimization of adverse effects on the nature cycle and landscape matters; from the point of view of emissions it is the duty of environment-compatible waste management within the sense of waste management legislation having to serve public welfare. (orig.) [de

  19. 78 FR 49735 - Intent To Prepare a Draft Environmental Impact Statement for Dam Safety Study, Lake Lewisville...

    Science.gov (United States)

    2013-08-15

    ... determine appropriate permanent methods for correcting potential problems, interim risk reduction measures... Environmental Impact Statement for Dam Safety Study, Lake Lewisville Dam, Elm Fork Trinity River, Denton County... primary purposes of the project are flood risk management, [[Page 49736

  20. 77 FR 38077 - Notice of Intent To Prepare an Environmental Impact Statement on a Proposed Boat-House Facility...

    Science.gov (United States)

    2012-06-26

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-NCR-GWMP-1202-9483: 3310-0250-471] Notice of Intent To Prepare an Environmental Impact Statement on a Proposed Boat-House Facility for Non-Motorized... identify a preferred site for construction of an environmentally sustainable facility for non-motorized...

  1. Financial statement in the Brazilian public sector: The perception of the professionals that prepare that information.

    Directory of Open Access Journals (Sweden)

    João Eudes de Souza Calado

    2016-12-01

    Full Text Available The objective of this paper is to identify the perception of the developers of the financial statements of public sector in respect to their difficulties in producing and disseminating such information, after the convergence of Brazil to the international standards IPSAS. Our methodological approach used multivariate descriptive techniques. Data was obtained through a survey, applied to professionals involved in the process of preparing the financial statement in the Brazilian public sector. The sample had 69 respondents, which corresponds to the perception of 85% of states and 46% of Brazilian cities. Data analysis was conducted using exploratory factor analysis. Results indicated that two perceptions of difficulties stood out: 1 the relevance of the information - its quality was not considered as being able to guide the internal user (decision-making or external user; 2 and the process of adaptation to the new standards - relationship between time and cost for adaptation. They also indicated the predominant focus on the Budget and the low adhesion to the Cash Flow Statement.

  2. Is Capitalization of Operating Lease Way to Increase of Comparability of Financial Statements Prepared in Accordance with IFRS and US GAAP?

    OpenAIRE

    Hana Bohušová

    2015-01-01

    The paper is concerned with an evaluation of possibilities of companies using operating lease and prepared financial statements under IFRS or US GAAP comparison. The data of non-financial companies listed on the Prague Stock Exchange and reporting information on operating lease in accordance with IAS 17 are used. The study presents the impact of operating lease capitalization on companies’ financial statements and financial analysis ratios. The results show a negative impact of operating leas...

  3. 75 FR 43496 - Department of the Army: Intent to Prepare a Draft Environmental Impact Statement for the General...

    Science.gov (United States)

    2010-07-26

    ... implementation of the alternative plans. The District will work as part of a team to include the New York State... Engineers, New York District (District), is preparing a Draft Environmental Impact Statement (DEIS) to...) document in accordance with the President's Council of Environmental Quality (CEQ) Rules and Regulations...

  4. 7 CFR 1794.61 - Environmental impact statement.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Environmental impact statement. 1794.61 Section 1794..., DEPARTMENT OF AGRICULTURE (CONTINUED) ENVIRONMENTAL POLICIES AND PROCEDURES Procedure for Environmental Impact Statements § 1794.61 Environmental impact statement. An EIS shall be prepared in accordance with...

  5. Final Environmental Impact Statement to construct and operate the Crownpoint Uranium Solution Mining Project, Crownpoint, New Mexico

    International Nuclear Information System (INIS)

    1997-02-01

    This Final Environmental Impact Statement (FEIS) addresses the proposed action of issuing a combined source and 11e(2) byproduct material license and minerals operating leases for Federal and Indian lands to Hydro Resources, Inc. (HRI). This action would authorize HRI to conduct in-situ leach uranium mining in McKinley County, New Mexico. Such mining would involve drilling wells to access the ore bodies, then recirculating groundwater with added oxygen to mobilize uranium found in the ore. Uranium would then be removed from the solution using ion exchange technology in processing plants located at three separate sites. As proposed by HRI, a central plant would provide drying and packaging equipment for the entire project. The Draft Environmental Impact Statement (DEIS) for the proposed action was prepared by an interagency review group comprising staff from the Nuclear Regulatory Commission, the Bureau of Indian Affairs, and the Bureau of Land Management, and published in October 1994. After evaluating the environmental impacts of the proposed action in the DEIS, the reviewing agencies concluded that the appropriate action was to issue the requested license and proposed leases authorizing HRI to proceed with the project. This FEIS reevaluates the proposed licensing action on the basis of written and oral comments received on the DEIS and on additional information obtained in 1995 and 1996. The FEIS describes and evaluates (1) the purpose of and need for the proposed action, (2) alternatives to the proposed action, (3) the environmental resources that could be affected by the proposed action and alternatives, (4) the potential environmental consequences of the proposed action and alternatives, and (5) the economic costs and benefits associated with the proposed action. Based on this assessment, the FEIS makes recommendations concerning the requested license and proposed leases

  6. Proposed IMS infrastructure improvement project, Seward, Alaska. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Environmental Impact Statement (EIS) examines a proposal for improvements at the existing University of Alaska, Fairbanks, Institute of Marine Science (IMS), Seward Marine Center. The Exxon Valdez Oil Spill (EVOS) Trustee Council is proposing to improve the existing research infrastructure to enhance the EVOS Trustee Council`s capabilities to study and rehabilitate marine mammals, marine birds, and the ecosystem injured by the Exxon Valdez oil spill. The analysis in this document focuses on the effects associated with construction and operation of the proposed project and its proposed alternatives. The EIS gives a detailed description of all major elements of the proposed project and its alternatives; identifies resources of major concern that were raised during the scoping process; describes the environmental background conditions of those resources; defines and analyzes the potential effects of the proposed project and its alternatives on these conditions; and identifies mitigating measures that are part of the project design as well as those proposed to minimize or reduce the adverse effects. Included in the EIS are written and oral comments received during the public comment period.

  7. Proposed IMS infrastructure improvement project, Seward, Alaska. Final environmental impact statement

    International Nuclear Information System (INIS)

    1994-09-01

    This Environmental Impact Statement (EIS) examines a proposal for improvements at the existing University of Alaska, Fairbanks, Institute of Marine Science (IMS), Seward Marine Center. The Exxon Valdez Oil Spill (EVOS) Trustee Council is proposing to improve the existing research infrastructure to enhance the EVOS Trustee Council's capabilities to study and rehabilitate marine mammals, marine birds, and the ecosystem injured by the Exxon Valdez oil spill. The analysis in this document focuses on the effects associated with construction and operation of the proposed project and its proposed alternatives. The EIS gives a detailed description of all major elements of the proposed project and its alternatives; identifies resources of major concern that were raised during the scoping process; describes the environmental background conditions of those resources; defines and analyzes the potential effects of the proposed project and its alternatives on these conditions; and identifies mitigating measures that are part of the project design as well as those proposed to minimize or reduce the adverse effects. Included in the EIS are written and oral comments received during the public comment period

  8. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 2: Public Involvement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    In regard to the proposed Tenaska Washington II Generation Project, the goal of the Bonneville Power Administration`s (BPA) Environmental Impact Statement (EIS) public involvement process is to determine the issues to be examined and pertinent analyses to be conducted and to solicit comments on the content and quality of information presented in the Draft Environmental Impact Statement (DEIS). Comments and questions are solicited from the public and government agencies during the scoping process and during the comment period and public hearing on the DEIS, to find out what is of most concern to them. The end product of the public involvement process is the Comment Report which follows in part of this volume on Public Involvement.

  9. Preparation of Financial Statements for Sme’s in Romania. Interest for Cash-Flow Statement

    Directory of Open Access Journals (Sweden)

    Nicoleta FARCANE

    2012-05-01

    Full Text Available The purpose of this article is to obtain feedback about the transition to IFRS standards and their implementation in the context of small and medium-sized enterprises in Romania in terms of the cashflow situation. Research methodology is based on a quantitative survey carried out in order to verify the importance and usefulness of perception on the cash-flow statement. The investigation based on testing four hypotheses has been carried out within the framework of small and medium-sized enterprises in Western Romania and the categories of respondents to the study were: upper management and accounting specialists. The results highlight the fact that there are differences between the categories of users of the cash-flow statements, fact highlighted and illustrated by our findings. The article ends with the conclusions of the authors regarding the importance and usefulness of the use and implementation of the cash-flow statement of the small and medium enterprises in Western Romania.

  10. 77 FR 33158 - Plumas National Forest, California, Sugarloaf Hazardous Fuels Reduction Project

    Science.gov (United States)

    2012-06-05

    ... Fuels Reduction Project AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an... National Forest (PNF) will prepare an environmental impact statement (EIS) on the Sugarloaf Hazardous Fuels... to the economic stability of rural communities through: fuels treatments; group selections (GS); area...

  11. 75 FR 9388 - Prescott National Forest, Bradshaw Ranger District; Arizona; Bradshaw Vegetation Management Project

    Science.gov (United States)

    2010-03-02

    ...; Arizona; Bradshaw Vegetation Management Project AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an environmental impact statement. SUMMARY: This project is a proposal to improve the health of.... The project area encompasses about 55,554 acres. Within the project area, the proposal is to...

  12. 40 CFR 6.207 - Environmental impact statements.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Environmental impact statements. 6.207... ACTIONS EPA's NEPA Environmental Review Procedures § 6.207 Environmental impact statements. (a) The Responsible Official will prepare an environmental impact statement (EIS) (see 40 CFR 1508.11) for major...

  13. 39 CFR 775.11 - Environmental impact statements.

    Science.gov (United States)

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Environmental impact statements. 775.11 Section... POLICY ACT PROCEDURES § 775.11 Environmental impact statements. (a) Determining scope. Before an environmental impact statement is prepared, the following procedures must be followed to determine what issues...

  14. 76 FR 5396 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Rising Tree Wind...

    Science.gov (United States)

    2011-01-31

    ...] Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Rising Tree Wind Farm... on issues and alternatives related to the Rising Tree Wind Farm Draft EIS/EIR and possible CDCA PA by... INFORMATION CONTACT: For further information and/or to have your name added to our mailing list, contact...

  15. Experimental Plasma Research project summaries

    International Nuclear Information System (INIS)

    1980-09-01

    This report contains descriptions of the activities supported by the Experimental Plasma Research Branch of APP. The individual project summaries were prepared by the principal investigators and include objectives and milestones for each project. The projects are arranged in six research categories: Plasma Properties; Plasma Heating; Plasma Diagnostics; Atomic, Molecular and Nuclear Physics; Advanced Superconducting Materials; and the Fusion Plasma Research Facility (FPRF). Each category is introduced with a statement of objectives and recent progress and followed by descriptions of individual projects. An overall budget summary is provided at the beginning of the report

  16. Experimental Plasma Research project summaries

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-09-01

    This report contains descriptions of the activities supported by the Experimental Plasma Research Branch of APP. The individual project summaries were prepared by the principal investigators and include objectives and milestones for each project. The projects are arranged in six research categories: Plasma Properties; Plasma Heating; Plasma Diagnostics; Atomic, Molecular and Nuclear Physics; Advanced Superconducting Materials; and the Fusion Plasma Research Facility (FPRF). Each category is introduced with a statement of objectives and recent progress and followed by descriptions of individual projects. An overall budget summary is provided at the beginning of the report.

  17. 75 FR 6175 - Notice of Intent to Prepare an Environmental Impact Statement on the Effects of Oil and Gas...

    Science.gov (United States)

    2010-02-08

    ... effects over a longer time frame, consider a more reasonable range of alternatives consistent with our... traditional knowledge in the decision- making process Effectiveness and feasibility of marine mammal... Intent to Prepare an Environmental Impact Statement on the Effects of Oil and Gas Activities in the...

  18. 75 FR 16422 - Plumas National Forest, California, Keddie Ridge Hazardous Fuels Reduction Project

    Science.gov (United States)

    2010-04-01

    ... Hazardous Fuels Reduction Project AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an... District will prepare and environmental impact statement (EIS) on the Keddie Ridge Hazardous Fuels...: fuels treatments, group selections, road improvements, and herbicide and mechanical applications in the...

  19. 75 FR 4842 - Winter Use Plan, Environmental Impact Statement, Yellowstone National Park

    Science.gov (United States)

    2010-01-29

    ... DEPARTMENT OF THE INTERIOR National Park Service Winter Use Plan, Environmental Impact Statement... to prepare an Environmental Impact Statement for a Winter Use Plan, Yellowstone National Park... Park Service (NPS) is preparing an Environmental Impact Statement (EIS) for a Winter Use Plan for...

  20. 77 FR 51981 - Notice of Intent To Prepare a Draft Environmental Impact Statement on the Construction and...

    Science.gov (United States)

    2012-08-28

    ... Draft Environmental Impact Statement on the Construction and Operation of the Everglades Agricultural... Basin (FEB) at the location of the Everglades Agricultural Area (EAA) A1 Reservoir project that was not... implementing the procedural requirements of NEPA (33 CFR part 230, USACE Engineering Regulation ER 200-2-2). A...

  1. 77 FR 75622 - Intent To Prepare a Draft Supplemental Environmental Impact Statement for Development of a Long...

    Science.gov (United States)

    2012-12-21

    ... Supplemental Environmental Impact Statement for Development of a Long-Term Sediment Management Plan of the... authorized work is described in the October 1985 report of the Chief of Engineers titled, Mount St. Helens... open construction project that was authorized in August 1985. The State of Washington is the non...

  2. Environmental impact statements: Nuclear generation, radioactive waste disposal, and isotope-separation projects. June 1973-September 1989 (Citations from the NTIS data base). Report for June 1973-September 1989

    Energy Technology Data Exchange (ETDEWEB)

    1989-11-01

    This bibliography contains citations concerning draft and final impact statements for environmental radiation hazards. Prepared by the Department of Energy, Nuclear Regulatory Commission, Oak Ridge National Laboratory, and others, these reports provide environmental input into the U.S. Department of Energy (DOE) decisions on proposed construction and decommissioning of nuclear power plants, radioactive-waste-disposal facilities and sites, and isotope-separation projects. Minor emphasis is placed upon community awareness and public concern where it applies to Federal guidelines and atomic facility location. (Contains 175 citations fully indexed and including a title list.)

  3. FINANCIAL STATEMENTS FOR LEGAL PERSONS WITHOUT PATRIMONIAL PURPOSE

    OpenAIRE

    DUMITRU FRANCA; MORARU MARIA

    2012-01-01

    Annual financial statements and annual financial statements that are simplified represent a whole. According to the law of accounting, annual financial statements must be accompanied by a written declaration of assumption of responsibility by the leadership of the legal person for annual financial statements in accordance with Accounting rules for legal persons without patrimonial purpose. Annual financial statements are prepared in a clear manner and should be consistent with the provisions ...

  4. 75 FR 48305 - Kaibab National Forest; Arizona; Uranium Exploratory Drilling Project

    Science.gov (United States)

    2010-08-10

    ... Drilling Project AGENCY: Forest Service, USDA. ACTION: Notice; correction. SUMMARY: This is a correction to a notice of intent to prepare an Environmental Impact Statement for the Uranium Exploratory Drilling... Exploratory Drilling Project, 800 S. 6th St., Williams, AZ 86046. Questions may also be submitted by facsimile...

  5. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Appendix A: BP Exploration (Alaska) Inc. Final project description - Revision 1, March 27, 1997

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains Appendix A of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment. This document is the Northstar Development Project, Final Project Description, Revision 1 for BPXA Northstar Project

  6. 10 CFR 51.95 - Postconstruction environmental impact statements.

    Science.gov (United States)

    2010-01-01

    ... NRC staff will prepare a supplement to the final environmental impact statement on the construction... 10 Energy 2 2010-01-01 2010-01-01 false Postconstruction environmental impact statements. 51.95... Implementing Section 102(2) Final Environmental Impact Statements-Production and Utilization Facilities § 51.95...

  7. 76 FR 71082 - Strata Energy, Inc., Ross Uranium Recovery Project; New Source Material License Application...

    Science.gov (United States)

    2011-11-16

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 40-9091; NRC-2011-0148] Strata Energy, Inc., Ross Uranium Recovery Project; New Source Material License Application; Notice of Intent To Prepare a... intent to prepare a supplemental environmental impact statement. SUMMARY: Strata Energy, Inc. (Strata...

  8. Electronic pay and leave statements (e-Payslips)

    CERN Document Server

    2004-01-01

    Within the framework of measures to simplify and rationalise administrative procedures, the FI and IT Departments proposed a project to introduce electronic pay and leave statements. The project was launched at the beginning of 2004 after it had been approved by the Director of the Finance and Human Resources Departments. The project was presented to the GTPA (Groupe de Travail sur les Procédures Administratives) and discussed at the meeting of the SCC (Standing Concertation Committee) on 8 July 2004. The system designed and developed by the IT Department is now operational. What will change? Members of the personnel who currently receive a paper copy of their pay and/or leave statement will, in future, receive monthly e-mail notification of their electronic pay and leave statement, instead of the paper document. The current project does not affect retired members of the personnel. Each person receiving the e-mail notification will be invited to consult these electronic statements by clicking on a link p...

  9. 77 FR 38823 - Notice of Availability of the Alta East Wind Project Draft Environmental Impact Statement...

    Science.gov (United States)

    2012-06-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA-052537, LLCAD05000, L51010000.FX0000, LVRWB11B4520] Notice of Availability of the Alta East Wind Project Draft Environmental Impact Statement/Environmental Impact Report and Proposed California Desert Conservation Area Plan Amendment, Kern County, CA...

  10. 77 FR 25782 - Environmental Impact Statement: Madison County, IL

    Science.gov (United States)

    2012-05-01

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement...: The FHWA is issuing this notice of intent to advise the public that an Environmental Impact Statement... the Illinois Department of Transportation (IDOT) will prepare an Environmental Impact Statement (EIS...

  11. Experimental plasma research project summaries

    International Nuclear Information System (INIS)

    1978-08-01

    This report contans descriptions of the activities supported by the Experimental Plasma Research Branch of APP. The individual project summaries were prepared by the principal investigators and include objectives and milestones for each project. The projects are arranged in six research categories: Plasma Properties; Plasma Heating; Plasma Measurements and Instrumentation; Atomic, Molecular and Nuclear Physics; Advanced Superconducting Materials; and the Fusion Plasma Research Facility (FPRF). Each category is introduced with a statement of objectives and recent progress and followed by descriptions of individual projects. An overall budget summary is provided at the beginning of the report

  12. 76 FR 381 - Notice of Availability of the Draft Environmental Impact Statement/Draft Environmental Impact...

    Science.gov (United States)

    2011-01-04

    ...In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), and the Federal Land Policy and Management Act of 1976, as amended (FLPMA), the Bureau of Land Management (BLM) and the California Public Utilities Commission (CPUC) have prepared a Draft Environmental Impact Statement (EIS), and Draft Environmental Impact Report (EIR) as a joint environmental analysis document for the Iberdrola Renewable/Pacific Wind Development Tule Wind Project (Tule Project) and the San Diego Gas and Electric's (SDG&E) East County Substation Project (ECO Project) and by this notice are announcing the opening of the comment period on the Draft EIS/EIR.

  13. 77 FR 22608 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Bald Mountain Mine...

    Science.gov (United States)

    2012-04-16

    ... normal business hours. SUPPLEMENTARY INFORMATION: Bald Mountain Mine (BMM), owned by Barrick Gold US Inc... Statement for the Proposed Bald Mountain Mine North and South Operations Area Projects, White Pine County.... ADDRESSES: You may submit comments related to the Bald Mountain Mine North and South Operations Area...

  14. 76 FR 2903 - Interconnection of the Proposed Hyde County Wind Energy Center Project (DOE/EIS-0461), and...

    Science.gov (United States)

    2011-01-18

    ... Wind Energy Center Project (DOE/EIS-0461), and Proposed Crowned Ridge Wind Energy Center Project (DOE... to prepare environmental impact statements (EISs) for the Hyde County Wind Energy Center Project and the Crowned Ridge Wind Energy Center Project in the Federal Register on November 30, 2010. Both...

  15. 10 CFR 51.85 - Draft environmental impact statement-rulemaking.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-rulemaking. 51.85... Implementing Section 102(2) Draft Environmental Impact Statements-Rulemaking § 51.85 Draft environmental impact... Commission has determined to prepare an environmental impact statement. ...

  16. Scoping session of the programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    1992-01-01

    This document is about the scoping session which was held at the Community Center in Falls City, Texas. The purpose was to obtain public comment on the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Project (UMTRA), specifically on the ground water project. Presentations made by the manager for the entire UMTRA program, manager of the site and ground water program, comments made by two residents of Fall City are included in this document

  17. Scoping session of the programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Project

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-12-31

    This document is about the scoping session which was held at the Community Center in Falls City, Texas. The purpose was to obtain public comment on the Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Project (UMTRA), specifically on the ground water project. Presentations made by the manager for the entire UMTRA program, manager of the site and ground water program, comments made by two residents of Fall City are included in this document.

  18. 75 FR 23666 - Huron-Manistee National Forests, White Pines Wind Farm Project, Mason County, MI

    Science.gov (United States)

    2010-05-04

    ... DEPARTMENT OF AGRICULTURE Forest Service Huron-Manistee National Forests, White Pines Wind Farm Project, Mason County, MI AGENCY: Forest Service, USDA. ACTION: Cancellation Notice of notice of intent to prepare an environmental impact statement. SUMMARY: The Forest Service proposed to prepare an...

  19. Final environmental impact statement Kenetech/PacifiCorp Windpower Project Carbon County, Wyoming

    International Nuclear Information System (INIS)

    1995-08-01

    The Draft and Final Environmental Impact Statements (DEIS and FEIS) assess the environmental consequences of a proposed windpower energy development in Carbon County, Wyoming. This abbreviated FEIS revises and supplements the DEIS for the project and addresses comments expressed for the DEIS. The proposed project entails the erection of approximately 1,390 wind turbine generators and associated facilities (e.g., roads, substations, distribution and communications lines) by KENETECH Windpower, Inc. A 230-kV transmission line would be built by PacifiCorp, Inc. to connect a proposed substation on Foote Creek Rim near Arlington to the Miner's substation near Hanna. The proposed project would use standard procedures as currently employed by other right-of-way projects, plus additional project-specific and site-specific mitigation measures to ensure that project impacts are minimized on all important resources. Impacts to most resources would be negligible to moderate during the life-of-project. Potentially significant impacts from the project include avian mortality; declining avian populations; threatened, endangered, candidate, and/or state sensitive species mortality and/or habitat loss; disturbance to nearby residents due to noise; changes in visual resources; disturbance of important Native American traditional sites; changes in plant community species composition due to snow redistribution; displacement of big game due to windfarm operation; and loss of sage grouse nesting habitat. The proposed project could also have numerous beneficial impacts including increased revenues generated by taxes, increased employment, and benefits derived from using a nonpolluting resource for electric power generation

  20. Final environmental statement related to the operation of the Teton Uranium ISL Project (Docket No). 40-8781

    International Nuclear Information System (INIS)

    1983-08-01

    This Final Environmental Impact Statement is issued by the US Nuclear Regulatory Commission in response to the request by Teton Exploration Drilling, Inc. for the issuance of an NRC Source and Byproduct Material License authorizing operation of the proposed Teton Project to mine uranium in situ by injecting a carbonate/bicarbonate lixiviant into the ore body. The statement considers: (1) alternative of no licensing action, (2) alternative energy sources, and (3) alternatives if uranium ore is mined and refined on the site. The proposed action is to grant a Source and Byproduct Material License to the applicant subject to the stipulated license condition

  1. Generic impact statement for commercial radioactive waste management

    International Nuclear Information System (INIS)

    Unruh, C.M.

    1976-01-01

    ERDA is preparing a generic environmental impact statement on the treatment and disposal of waste resulting from commercial reactors and post fission operations in the light water reactor (LWR) fuel cycle. Expert contributions will be provided by many of the ERDA national laboratories and contractors. The waste management aspects of the statement will be based on available technology as presented in the recently issued ''Alternatives for Managing Waste from Reactors and Post Fission Operations in the LWR Fuel Cycle,'' ERDA-76-43 Document. This 1500 page, five volume Technical Alternative Document (TAD) describes the status of technology (to September, 1975) for handling post fission radioactive waste generated by the production of electricity by nuclear power light water reactor-generator systems. The statement will be generic in nature discussing typical or hypothetical facilities in typical or hypothetical environments. It is not intended to replace environmental statements required in support of specific projects nor for Nuclear Regulatory Commission licensing procedures. A major purpose of the generic statement is to inform the public and to solicit comments on the ERDA program for: (1) the final disposition of commercial radioactive waste, (2) waste treatment, (3) waste interim storage, and (4) transportation of waste. The statement will discuss the ERDA contingency program to provide retrievable storage of such waste if they should be transferred to Federal custody prior to the availability of the geologic isolation facilities for terminal disposal. The generic statement will not address radioactive waste resulting from U.S. Defense Programs, the mining or milling of uranium, the management of waste from the breeder reactor program, waste from other nations, nor will it include an evaluation of the impact of waste resulting from power sources other than light water reactors

  2. 75 FR 76481 - Notice of Intent To Prepare Environmental Impact Statement for the HOPE SF Development at Alice...

    Science.gov (United States)

    2010-12-08

    ... Environmental Impact Statement for the HOPE SF Development at Alice Griffith Public Housing Development, San... Housing as part of its HOPE SF development program. Funding for the project may include HUD funds from... revitalization program under HOPE SF (Cal 118). The proposed development would be located on approximately 20 net...

  3. 10 CFR 1021.310 - Environmental impact statements.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Environmental impact statements. 1021.310 Section 1021.310 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES Implementing Procedures § 1021.310 Environmental impact statements. DOE shall prepare and...

  4. 10 CFR 51.72 - Supplement to draft environmental impact statement.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Supplement to draft environmental impact statement. 51.72... Implementing Section 102(2) Environmental Impact Statements § 51.72 Supplement to draft environmental impact statement. (a) The NRC staff will prepare a supplement to a draft environmental impact statement for which a...

  5. 10 CFR 51.70 - Draft environmental impact statement-general.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-general. 51.70... Implementing Section 102(2) Environmental Impact Statements § 51.70 Draft environmental impact statement—general. (a) The NRC staff will prepare a draft environmental impact statement as soon as practicable...

  6. 10 CFR 51.71 - Draft environmental impact statement-contents.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-contents. 51.71... Implementing Section 102(2) Environmental Impact Statements § 51.71 Draft environmental impact statement—contents. (a) Scope. The draft environmental impact statement will be prepared in accordance with the scope...

  7. 29 CFR 99.310 - Financial statements.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Financial statements. 99.310 Section 99.310 Labor Office of the Secretary of Labor AUDITS OF STATES, LOCAL GOVERNMENTS, AND NON-PROFIT ORGANIZATIONS Auditees § 99... have separate audits in accordance with § 99.500(a) and prepare separate financial statements. (b...

  8. 75 FR 2517 - Notice of Intent To Prepare a Joint Environmental Impact Statement and Environmental Impact...

    Science.gov (United States)

    2010-01-15

    ...The action being taken is the preparation of a joint environmental impact statement/environmental impact report (EIS/EIR) for the Lower San Joaquin River Feasibility Study (LSJRFS). The EIS/EIR will be prepared in accordance with the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The U.S. Army Corps of Engineers (USACE) will serve as lead agency for compliance with NEPA, and the San Joaquin Area Flood Control Agency (SJAFCA) will serve as lead agency for compliance with CEQA. The LSJRFS will evaluate alternatives, including a locally preferred plan, for providing flood damage reduction and ecosystem restoration along the lower (northern) portion of the San Joaquin River system in the Central Valley of California. The approximate area of the proposed action and analysis is identified in Figure 1.

  9. Consolidation Process for FY 1997 Financial Statements for Other Defense Organizations

    National Research Council Canada - National Science Library

    1998-01-01

    ... to prepare consolidated financial statements for FY 1996 and each succeeding year. The DoD Consolidated Financial Statements for FY 1997 include financial statements for a reporting entity entitled "Other Defense Organizations...

  10. 77 FR 36329 - Notice of Intent to Prepare an Environmental Impact Statement and Notice of Scoping Meeting

    Science.gov (United States)

    2012-06-18

    ...In accordance with the National Environmental Policy Act (NEPA), 42 U.S.C. 4321-4347, the Department of State (DOS) announces its intent to prepare an Environmental Impact Statement (EIS) and initiate the scoping process for the proposed agency action as specified below. The EIS will evaluate the impacts on the affected environment, including, but not limited to, socioeconomics, traffic and transportation, land use, historic and cultural resources, noise, air quality, environmental justice, and cumulative impacts.

  11. 77 FR 48145 - Cameron Interstate Pipeline, LLC, Cameron LNG, LLC; Notice of Intent To Prepare an Environmental...

    Science.gov (United States)

    2012-08-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. PF12-12-000; PF12-13-000] Cameron Interstate Pipeline, LLC, Cameron LNG, LLC; Notice of Intent To Prepare an Environmental Impact Statement for the Planned Cameron Pipeline Expansion Project and Cameron LNG Liquefaction Project, Request for Comments on Environmental Issues,...

  12. Advanced Fusion Concepts project summaries. FY 1983

    International Nuclear Information System (INIS)

    1983-06-01

    This report contains descriptions of the activities of all the projects supported by the Advanced Fusion Concepts Branch of the Office of Fusion Energy, US Department of Energy. These descriptions are project summaries of each of the individual projects, and contain the following: title, principle investigators, funding levels, purpose, approach, progress, plans, milestones, graduate studients, graduates, other professional staff, and recent publications. The individual project summaries are prepared by the principle investigators in collaboration with the Advanced Fusion Concepts (AFC) Branch. In addition to the project summaries, statements of branch objectives, and budget summaries are also provided

  13. Final Environmental Statement related to the operation of WPPSS Nuclear Project No. 3 (Docket No. 50-508)

    International Nuclear Information System (INIS)

    1985-05-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with the Washington Public Power System Nuclear Project No. 3 (WNP-3) pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental benefits and costs. Land use and terrestrial and aquatic resource impacts will be small. Operational impacts to historic and archeological sites will be negligible. The effects of routine operations, energy transmission and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. The net socioeconomic effects of the project will be beneficial

  14. Stuart oil shale project stage two: executive summary: draft environmental impact statement

    International Nuclear Information System (INIS)

    1999-09-01

    The project is an oil shale open pit mine and processing operation that is currently being commissioned 15 km north of Gladstone, Queensland, Australia, and is owned as a joint venture by Southern Pacific Petroleum N.L., Central Pacific Minerals N.L, and Suncor Energy Inc., a leading Canadian company that is an integrated energy company. The results of a comprehensive investigation are included of the potential environmental impacts of the project, and which are described in the Draft Environmental Impact Statement (EIS). In stage two, there is included the existing mine expansion as well as the construction of an additional process plant based around a larger commercial scale ATP oil shale processing plant. The new stage two operation will be developed next to and integral with services and infrastructure provided for stage one. Described are: the assessment process, regulatory framework and the project area, the needs for an alternative to the project, the proposal itself, the existing natural, social and economic impacts, and the environmental impacts as well as plans for their mitigation. In appendices there are included a draft environmental management overview strategy and an environmental management plan. The elements covered in the report by section are: background, need for the project, the proponent, legislation and approvals, project description, environmental issues and impact management

  15. Reading and understanding financial statements.

    Science.gov (United States)

    White, Joseph P

    2005-01-01

    Feeling comfortable reading and understanding financial statements is critical to the success of healthcare executives and physicians involved in management. Businesses use three primary financial statements: a balance sheet represents the equation, Assets = Liabilities + Equity; an income statement represents the equation, Revenues - Expenses = Net Income; a statement of cash flows reports all sources and uses of cash during the represented period. The balance sheet expresses financial indicators at one particular moment in time, whereas the income statement and the statement of cash flows show activity that occurred over a stretch of time. Additional information is disclosed in attached footnotes and other supplementary materials. There are two ways to prepare financial statements. Cash-basis accounting recognizes revenue when it is received and expenses when they are paid. Accrual-basis accounting recognizes revenue when it is earned and expenses when they are incurred. Although cash-basis is acceptable, periodically using the accrual method reveals important information about receivables and liabilities that could otherwise remain hidden. Become more engaged with your financial statements by spending time reading them, tracking key performance indicators, and asking accountants and financial advisors questions. This will help you better understand your business and build a successful future.

  16. 21 CFR 25.42 - Environmental impact statements.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Environmental impact statements. 25.42 Section 25... ENVIRONMENTAL IMPACT CONSIDERATIONS Preparation of Environmental Documents § 25.42 Environmental impact... be a clear, concise, and detailed written statement describing: (1) The environmental impacts of a...

  17. 32 CFR 989.16 - Environmental impact statement.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Environmental impact statement. 989.16 Section... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.16 Environmental impact statement. (a) Certain classes of environmental impacts normally require preparation of an EIS (40 CFR 1501.4). These include...

  18. Statement of work for the immobilized high-level waste transportation system, Project W-464

    Energy Technology Data Exchange (ETDEWEB)

    Mouette, P.

    1998-06-24

    The objective of this Statement of Work (SOW) is to present the scope, the deliverables, the organization, the technical and schedule expectations for the development of a Package Design Criteria (PDC), cost and schedule estimate for the acquisition of a transportation system for the Immobilized High-Level Waste (IHLW). This transportation system which includes the truck, the trailer, and a shielded cask will be used for on-site transportation of the IHLW canisters from the private vendor vitrification facility to the Hanford Site interim storage facility, i.e., vaults 2 and 3 of the Canister Storage Building (CSB). This Statement of Work asks Waste Management Federal Services, Inc., Northwest Operations, to provide Project W-464 with a Design Criteria Document, plus a life-cycle schedule and cost estimate for the acquisition of a transportation system (shielded cask, truck, trailer) for IHLW on-site transportation.

  19. North Central Transmission Line: Guidelines for the environmental impact statement

    International Nuclear Information System (INIS)

    1992-01-01

    Guidelines that Manitoba Hydro must follow in the preparation of the environmental impact statement on the proposed North Central Transmission Line (TCTL) project are presented. The project consists of a 138 kV transmission line, two 25 kV distribution lines, and related ancillary structures and facilities. The review process must be sensitive to cultural and community needs and must involve those most directly affected, and should be grounded in the impacted northern communities. The review should include a project background, the proposal, a description of the existing natural and socio-economic environment, and must address employment, education and training, impacts on renewable resource harvesting, environmental impacts, social impacts and economic impacts, legal/jurisdictional issues, infrastructure, mitigation and compensation, and environmental monitoring and follow-up. 1 fig., 20 tabs

  20. Positron--electron storage ring project: Stanford Linear Accelerator Center, Stanford, California. Final environmental statement

    International Nuclear Information System (INIS)

    1976-08-01

    A final environmental statement is given which was prepared in compliance with the National Environmental Policy Act to support the Energy Research and Development Administration project to design and construct the positron-electron colliding beam storage ring (PEP) facilities at the Stanford Linear Accelerator Center (SLAC). The PEP storage ring will be constructed underground adjacent to the existing two-mile long SLAC particle accelerator to utilize its beam. The ring will be about 700 meters in diameter, buried at depths of 20 to 100 feet, and located at the eastern extremity of the SLAC site. Positron and electron beams will collide in the storage ring to provide higher energies and hence higher particle velocities than have been heretofore achieved. Some of the energy from the collisions is transformed back into matter and produces a variety of particles of immense interest to physicists. The environmental impacts during the estimated two and one-half years construction period will consist of movement of an estimated 320,000 cubic yards of earth and the creation of some rubble, refuse, and dust and noise which will be kept to a practical minimum through planned construction procedures. The terrain will be restored to very nearly its original conditions. Normal operation of the storage ring facility will not produce significant adverse environmental effects different from operation of the existing facilities and the addition of one water cooling tower. No overall increase in SLAC staff is anticipated for operation of the facility. Alternatives to the proposed project that were considered include: termination, postponement, other locations and construction of a conventional high energy accelerator

  1. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Appendix K (continued)

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains Appendices K (continued) of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment

  2. Genesis and Development of Consolidated Financial Statements

    OpenAIRE

    Kostyantyn Bezverkhiy

    2015-01-01

    In the context of economy globalization it is the mission of consolidated financial statements to meet demands of users for financial information about activities of a company group as one company. The article is devoted to study of genesis and development of consolidated financial statements of companies. Historical prerequisites of genesis of consolidated financial statements are shown as well as factors which conduced to their spreading. The approaches are elucidated to preparation of cons...

  3. Final environmental statement for the geothermal leasing program

    Energy Technology Data Exchange (ETDEWEB)

    1973-12-31

    This second of the four volumes of the Geothermal Leasing Program final impact statement contains the individual environmental statements for the leasing of federally owned geothermal resources for development in three specific areas: Clear Lake-Geysers; Mono Lake-Long Valley; and Imperial Valley, all in California. It also includes a summary of the written comments received and departmental responses relative to the Draft Environmental Impact Statement issued in 1971; comments and responses on the Draft Environmental Impact Statement; consultation and coordination in the development of the proposal and in the preparation of the Draft Environmental Statement; and coordination in the review of the Draft Environmental Statement.

  4. Advanced mixed waste treatment project draft environmental impact statement

    International Nuclear Information System (INIS)

    1998-07-01

    The AMWTP DEIS assesses the potential environmental impacts associated with four alternatives related to the construction and operation of a proposed waste treatment facility at the INEEL. Four alternatives were analyzed: The No Action Alternative, the Proposed Action, the Non-Thermal Treatment Alternative, and the Treatment and Storage Alternative. The proposed AMWTP facility would treat low-level mixed waste, alpha-contaminated low-level mixed waste, and transuranic waste in preparation for disposal. Transuranic waste would be disposed of at the Waste isolation Pilot Plant in New Mexico. Low-level mixed waste would be disposed of at an approval disposal facility depending on decisions to be based on DOE's Final Waste Management Programmatic Environmental Impact Statement. Evaluation of impacts on land use, socio-economics, cultural resources, aesthetic and scenic resources, geology, air resources, water resources, ecological resources, noise, traffic and transportation, occupational and public health and safety, INEEL services, and environmental justice were included in the assessment. The AMWTP DEIS identifies as the Preferred Alternative the Proposed Action, which is the construction and operation of the AMWTP facility

  5. The appliction of project management in operations preparation of nuclear power station

    International Nuclear Information System (INIS)

    Tang Zhengrong; Zhang Zhixiong

    2001-01-01

    Concept, history, characteristics of the project management is introduced. Analysis is performed on the suitability of application of project management approach in nuclear power station operations preparation. Then the application of project management is detailed in order to present the readers our study and practice. Theory and practice indicate that the project management is a useful management tool for operations preparation of nuclear power station to achieve a good performance

  6. Environmental Impact Statement: Waste Isolation Pilot Plant (WIPP): Executive summary

    International Nuclear Information System (INIS)

    1980-10-01

    The purpose of this document is to provide a summary of the environmental impact statement for the Waste Isolation Pilot Plant (WIPP) project. The Draft Environmental Impact Statement for the WIPP was published by the US Department of Energy (DOE) in April 1979. This document was reviewed and commented on by members of the general public, private organizations, and governmental agencies. The Final Environmental Impact Statement was subsequently published in October, 1980. This summary is designed to assist decision-maker and interested individuals in reviewing the material presented in the environmental impact statement for the WIPP project. To make this material widely available, this summary is published in both Spanish and English. Additional, more detailed information concerning the environmental and safety consequences of the WIPP project is available in the Final Environmental Impact Statement. Written comments and public hearing comments on the Draft Environmental Impact Statement are available for review. 27 refs., 4 figs., 7 tabs

  7. AICPA allows low-cost options for compiled financial statements.

    Science.gov (United States)

    Reinstein, Alan; Luecke, Randall W

    2002-02-01

    The AICPA Accounting and Review Services Committee's (ARSC) SSARS No. 8, Amendment to Statement on Standards for Accounting and Review Services No. 1, Compilation and Review of Financial Statements, issued in October 2000, allows financial managers to provide plain-paper, compiled financial statements for the exclusive use of management. Such financial statements were disallowed in 1979 when the AICPA issued SSARS No. 1, Compilation and Review of Financial Statements. With the issuance of SSARS No. 8, financial managers can prepare plain-paper, compiled financial statements when third parties are not expected to rely on the financial statements, management acknowledges such restrictions in writing, and management acknowledges its primary responsibility for the adequacy of the financial statements.

  8. Consolidating Financial Statements.

    Science.gov (United States)

    Wood, Marcia R.

    This publication is designed to be a desktop reference and assist financial officers in both public and independent institutions of higher education in the preparation of consolidated financial statements. Chapter 1 covers generally accepted accounting principles and other accounting literature, and summarizes reporting rules of the Financial…

  9. 46 CFR 298.42 - Reporting requirements-financial statements.

    Science.gov (United States)

    2010-10-01

    ... statements be in accordance with generally accepted accounting principles, by accountants as described in... report and an annual financial report, prepared in accordance with generally accepted accounting... 46 Shipping 8 2010-10-01 2010-10-01 false Reporting requirements-financial statements. 298.42...

  10. 77 FR 59180 - Withdrawal of Intent To Prepare a Draft Environmental Impact Statement/Environmental Impact...

    Science.gov (United States)

    2012-09-26

    ...The Los Angeles District of the U.S. Army Corps of Engineers (Corps) published a Notice of Intent to Prepare a Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Ballona Creek Ecosystem Restoration Feasibility Study in the Federal Register on September 20, 2005 (70 FR 55116). The study's purpose is to evaluate structural and non-structural means of restoring diminished ecosystem functions and services within the lower reach of Ballona Creek including coastal wetlands. Santa Monica Bay Restoration Commission (SMBRC) is the local sponsor for the cost-shared study. On September 29, 2005, a public scoping meeting was held pursuant to requirements of the National Environmental Policy Act and Engineer Regulations 1105-2-100. Baseline conditions portions of the EIS/EIR have been completed as of January, 2012. On July 17, 2012, the SMBRC requested the Corps terminate the study. Therefore, the Corps is withdrawing the Notice of Intent to Prepare a draft EIS/EIR.

  11. Improvements of the cash-flow statement control function in financial reporting

    Directory of Open Access Journals (Sweden)

    Metka Duhovnik

    2008-06-01

    Full Text Available On the basis of deductive considerations applying professional judgement, the article focuses on the additional value of accounting information that can be given to the users of fi nancial statements by a properly prepared statement of cash fl ows. It is based on the fi nding that the professional literature is inconsistent in distinguishing liquidity and profi tability information, and consequently also in distinguishing between the ratios calculated on that basis. It therefore stimulates an improvement in the quality of accounting information with a direct statement of cash fl ows, based on tracing instead of calculating the actual cash fl ow. On the basis of fi nancial statements, including a direct statement of cash fl ows, the ratio analysis of fi nancial statements should be approached from both aspects of profi tability and cash return. The cash fl ow ratios would serve as a control mechanism over the assumptions used when preparing the balance sheet and income statement within the chosen financial reporting framework.

  12. 77 FR 64543 - Notice of Availability of the Final Environmental Impact Statement for the Mount Hope Project...

    Science.gov (United States)

    2012-10-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLNVB01000 L51100000.GN0000.LVEMF12CF010 241A; NVN-082096; NVN-084632; NVN-091272; 12-08807; MO 4500039779; TAS: 14X5017] Notice of Availability of the Final Environmental Impact Statement for the Mount Hope Project, Eureka County, NV Correction...

  13. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final

    Energy Technology Data Exchange (ETDEWEB)

    None

    1999-02-01

    This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Proposed Action includes the construction, operation, and decommissioning of a 48 megawatt (gross) geothermal power plant with ancillary facilities (10-12 production well pads and 3-5 injection well pads, production and injection pipelines), access roads, and a 230-kilovolt (kV) transmission line in the Modoc National Forest in Siskiyou County, California. Alternative locations for the power plant site within a reasonable distance of the middle of the wellfield were determined to be technically feasible. Three power plant site alternatives are evaluated in the Final EIS/EIR.

  14. Solution preparation

    International Nuclear Information System (INIS)

    Seitz, M.G.

    1982-01-01

    Reviewed in this statement are methods of preparing solutions to be used in laboratory experiments to examine technical issues related to the safe disposal of nuclear waste from power generation. Each approach currently used to prepare solutions has advantages and any one approach may be preferred over the others in particular situations, depending upon the goals of the experimental program. These advantages are highlighted herein for three approaches to solution preparation that are currently used most in studies of nuclear waste disposal. Discussion of the disadvantages of each approach is presented to help a user select a preparation method for his particular studies. Also presented in this statement are general observations regarding solution preparation. These observations are used as examples of the types of concerns that need to be addressed regarding solution preparation. As shown by these examples, prior to experimentation or chemical analyses, laboratory techniques based on scientific knowledge of solutions can be applied to solutions, often resulting in great improvement in the usefulness of results

  15. The application of project management in operations preparation of nuclear power station

    International Nuclear Information System (INIS)

    Zhang Zhixiong; Tang Zhengrong

    2000-01-01

    The author first presents a brief introduction of the concept, history, characteristics of project management. Analysis is performed on the suitability of application of project management approach in nuclear power station operations preparation. Then the application of project management is detailed in order to present the readers authors' study and practice. Theory and practice indicate that the project management is a useful management tool for operations preparation of nuclear power station to achieve a good performance

  16. Statement on current progress of the EPR project. Basic Design phase concluded

    International Nuclear Information System (INIS)

    Lamprecht, F.

    1997-01-01

    Against the background of expected increasing demand for electric power worldwide it is obvious that any existing technology for electricity generation will be required in the future to meet the demand, just as well as technology improvements. Nuclear industry's answer to this challenge are activities for further evolution of the PWR concept as a joint venture of France and Germany for development of the European Pressurized Water Reactor (EPR). The project participants are reactor manufacturers and operators of both countries as well as organisations responsible for reactor safety. The Basic Design phase which started in 1995, after prior definition of the common safety philosophy, has recently been concluded. The results have been presented at a meeting in October 1997 in Cologne, organised by KTG and SFEN, the countries' respective nuclear societies. The broad statement is that project work was successful in achieving two major objectives: A well-balanced safety concept, and a competitive design. (orig./CB) [de

  17. Relationship management in preparation for the new engineering projects

    Directory of Open Access Journals (Sweden)

    Magomedova Julia Yurievna

    2011-07-01

    Full Text Available The author reveals the constituent elements of the customer relationship and the Executive in the preparation of a new engineering projects. Relationships are built with a focus on effective risk management in the execution of the project on energy efficiency a major consumer.

  18. 16 CFR 1.84 - Draft environmental impact statements: Availability and comment.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Draft environmental impact statements... Environmental Policy Act of 1969 § 1.84 Draft environmental impact statements: Availability and comment. Except for proposals for legislation, environmental impact statements shall be prepared in two stages: Draft...

  19. A comparative review of accident studies from recent environmental impact statements

    International Nuclear Information System (INIS)

    Mueller, C.; Folga, S.; Nabelssi, B.

    1996-01-01

    The U.S. Department of Energy (DOE) has recently prepared or is in the process of preparing a number of programmatic and site-specific environmental impact statements (EISs). This study was conducted for the purpose of reviewing the self-consistency of programmatic alternatives, associated relative impacts, and supporting data, methods, and assumptions in EISs prepared for related activities. The following EISs, which deal with waste management issues, are reviewed in this paper (the parenthetical acronyms are referred to in Table 1): (1) Final Environmental Impact Statement, Savannah River Site Waste Management, DOE/EIS-0217, Vol. II, July 1995. (SRS WM-EIS), (2) Draft Waste Management Programmatic Environmental Impact Statement for Managing Treatment, Storage, and Disposal of Radioactive and Hazardous Waste, DOE/EIS-0200-D, Vol. IV, Aug. 1995. (WM PEIS), (3) Final Environmental Impact Statement, Interim Management of Nuclear Materials at the Savannah River Site. DOE/EIS-0220, Oct. 1995. (IMNM EIS), (4) Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Environmental Impact Statement, DOE/EIS-0203-F, April 1995. (INEL Site-Wide-EIS), (5) Draft Environmental Impact Statement, Disposition of Surplus Highly Enriched Uranium, DOE/EIS-0240-D, Oct. 1995. (HEU Disposition EIS), (6) Final Environmental Impact Statement, Safe Interim Storage of Hanford Tank Wastes, Hanford Site, Richland, Washington, DOE/EIS-0212, Oct. 1995. (SIS EIS). This study compares the facility accident analysis approaches used in these EISs vis-a-vis the National Environmental Policy Act (NEPA) guidance developed by DOE (Recommendations for the Preparation of Environmental Assessments and Environmental Impact Statements, Office of NEPA Oversight). The purpose of the comparative review of these approaches with NEPA guidance is to identify potential preferred paths for future EISs

  20. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Appendices B through K

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US. Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains Appendices B--K of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment

  1. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Appendices L through P

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains Appendices L-P of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment

  2. 76 FR 70955 - Helena Nation Forest: Dalton Mountain Forest Restoration & Fuels Reduction Project

    Science.gov (United States)

    2011-11-16

    ... DEPARTMENT OF AGRICULTURE Forest Service Helena Nation Forest: Dalton Mountain Forest Restoration & Fuels Reduction Project AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an environmental impact statement. SUMMARY: The Helena National Forest (HNF) is proposing on the Lincoln Ranger...

  3. Statements of work for FY 1996 to 2001 for the Hanford Low-Level Tank Waste Performance Assessment Project

    International Nuclear Information System (INIS)

    Mann, F.M.

    1995-01-01

    The statements of work for each activity and task of the Hanford Low-Level Tank Waste Performance Assessment project are given for the fiscal years 1996 through 2001. The end product of this program is approval of a final performance assessment by the Department of Energy in the year 2000

  4. 78 FR 11672 - Notice of Availability of the Final Environmental Impact Statement for the Alta East Wind Project...

    Science.gov (United States)

    2013-02-19

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [CACA-052537, LLCAD05000, L51010000.LVRWB11B4520.FX0000] Notice of Availability of the Final Environmental Impact Statement for the Alta East Wind Project, Kern County, CA, and Proposed Land Use Plan Amendment AGENCY: Bureau of Land Management, Interior...

  5. 78 FR 20714 - Environmental Impact Statement: Cook County, Illinois

    Science.gov (United States)

    2013-04-05

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement: Cook... Department of Transportation, is preparing an environmental impact statement (EIS) on a proposal to improve.... SUMMARY: The FHWA is issuing this revised notice of intent to advise the public that an environmental...

  6. 78 FR 79658 - Environmental Impact Statement; Animal Carcass Management

    Science.gov (United States)

    2013-12-31

    ...] Environmental Impact Statement; Animal Carcass Management AGENCY: Animal and Plant Health Inspection Service... prepare an environmental impact statement to examine the potential environmental effects of animal carcass... of animal carcass management options used throughout the United States. The EIS will analyze and...

  7. Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

  8. Environmental impact statement - an effective tool for successful mine design

    International Nuclear Information System (INIS)

    Sinha, A.K.

    1996-01-01

    Mining is a hazardous operation which must be designed to succeed under very unpredictable environmental, geological and marketing conditions over a committed life of thirty years or longer. It is well-established by now that mining has tremendous social, economic and environmental impacts on society in general and on local communities in particular. Mining's image has begun to improve with effective hazard controls and property reclamation through improved mine design and restoration plans. Much of the credit for this achievement should go to Environmental Impact Statement and related permitting requirements for mining projects. An Environmental Impact Statement with respect to almost every type of mining project is now frequently required by major banks, and other funding agencies, governmental agencies and/or citizen groups involved in the permitting process. This impact statement ensures that the proposed project has the potential to succeed under all foreseeable environmental, geological and marketing problems throughout its projected life and to guarantee the return of the initial capital with interest. In short, the impact statement offers assurance that the final project will culminate with positive environmental and social impacts. The relevance and contributions of Environmental Impact Statements in mine design, as well as their applications and development procedures are presented. 3 refs., 8 figs

  9. 18 CFR 380.6 - Actions that require an environmental impact statement.

    Science.gov (United States)

    2010-04-01

    ... environmental impact statement. 380.6 Section 380.6 Conservation of Power and Water Resources FEDERAL ENERGY... ENVIRONMENTAL POLICY ACT § 380.6 Actions that require an environmental impact statement. (a) Except as provided in paragraph (b) of this section, an environmental impact statement will normally be prepared first...

  10. Quality of environmental impact statements in Portugal and Spain

    International Nuclear Information System (INIS)

    Canelas, Leonel; Almansa, P.; Merchan, M.; Cifuentes, Pedro

    2005-01-01

    One of the key steps of the Environmental Impact Assessment Process, defined by Directive 337/85 'on the assessment of the effects of certain public and private projects' is the preparation of the Environmental Impact Statement (EIS) of a Project. The quality of the EIS is of great importance to properly inform the public and the decision makers about the significant environmental effects of the project. Using the 'Guidance on EIA-EIS Review' 2001 report, produced with the support of the European Commission, this paper analyses the overall quality of 46 recently elaborated EIS from Portugal and Spain (1998-2003). It also analyses the quality of the various chapters of the EIS and the Non-Technical Summary. A comparison is made between the quality of the EIS from Portugal and from Spain. The results for Portugal are also compared with those of other European countries (Ireland and United Kingdom) in similar periods. Finally it presents overall conclusions and suggestions for improvement

  11. 12 CFR 563c.1 - Form and content of financial statements.

    Science.gov (United States)

    2010-01-01

    ... ACCOUNTING REQUIREMENTS Form and Content of Financial Statements § 563c.1 Form and content of financial... statements shall: (1) Be prepared and presented in accordance with generally accepted accounting principles... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Form and content of financial statements. 563c...

  12. Statements of work handbook. [technical writing for NASA programs

    Science.gov (United States)

    1975-01-01

    Guidelines are presented for preparing statements of work (SOW) to assure a consistent approach throughout NASA. Statements of work for study and preliminary definition contracts, for definition and development of major systems, for support services, and for small research and development contracts are discussed.

  13. CSNI collective statement on support facilities for existing and advanced reactors. The function of OECD/Nea joint projects Nea committee on the safety of nuclear installations (CSNI)

    International Nuclear Information System (INIS)

    2008-01-01

    The NEA Committee on the Safety of Nuclear Installations (CSNI) has recently completed a study on the availability and utilisation of facilities supporting safety studies for current and advanced nuclear power reactors. The study showed that significant steps had been undertaken in the past several years in support of safety test facilities, mainly by conducting multinational joint projects centered on the capability of unique test facilities worldwide. Given the positive experience of the safety research projects, it has been recommended that efforts be made to prioritize technical issues associated with advanced (Generation IV) reactor designs and to develop options on how to efficiently obtain the necessary data through internationally co-ordinated research, preparing a gradual extension of safety research beyond the needs set by currently operating reactors. This statement constitutes a reference for future CSNI activities and for safety authorities, R and D centres and industry for internationally co-ordinated research initiatives in the nuclear safety research area. (author)

  14. Portsmouth Gaseous Diffusion Plant expansion, Piketon, Ohio. Volume 1. Draft environmental statement

    Energy Technology Data Exchange (ETDEWEB)

    1976-06-01

    Subject to authorizing legislation and funding, ERDA will proceed with steps for additional uranium enrichment capacity at the Portsmouth Gaseous Diffusion Plant near Piketon, Ohio. This environmental statement was prepared by ERDA to cover this action. The statement was prepared in accordance with the National Environmental Policy Act of 1969, and ERDA's implementing regulations, 10 CFR Chapter III, Part 711. The statement describes the reasonably foreseeable environmental, social, economic and technological costs and benefits of the construction and operation of the expanded enrichment plant and its reasonably available alternatives and their anticipated effects.

  15. Portsmouth Gaseous Diffusion Plant expansion, Piketon, Ohio. Volume 1. Draft environmental statement

    International Nuclear Information System (INIS)

    1976-06-01

    Subject to authorizing legislation and funding, ERDA will proceed with steps for additional uranium enrichment capacity at the Portsmouth Gaseous Diffusion Plant near Piketon, Ohio. This environmental statement was prepared by ERDA to cover this action. The statement was prepared in accordance with the National Environmental Policy Act of 1969, and ERDA's implementing regulations, 10 CFR Chapter III, Part 711. The statement describes the reasonably foreseeable environmental, social, economic and technological costs and benefits of the construction and operation of the expanded enrichment plant and its reasonably available alternatives and their anticipated effects

  16. Environmental assessment for Mound Plant decontamination and decommissioning projects, Mound Plant, Miamisburg, Ohio

    International Nuclear Information System (INIS)

    1995-05-01

    The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA) for seven decontamination and decommissioning (D ampersand D) projects at the Mound Plant in Miamisburg, Ohio, that have not been previously addressed in the Final Environmental Impact Statement for the Mound Facility (June 1979). Based on the information presented in the EA, the DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and the Department is issuing this Finding of No Significant Impact (FONSI)

  17. WPPSS Nuclear Project No. 2: Final environmental statement (DOCKET No. 50-397)

    International Nuclear Information System (INIS)

    1981-12-01

    The proposed action is the issuance of an operating license to the Washington Public Power Supply System (WPPSS) for the startup and operation of the Washington Nuclear Project Number 2 (WNP-2) located on the Columbia River in Benton County, about 19 km (12 mi) north of Richland, Washington. The facility will employ a boiling water reactor to produce 3323 megawatts thermal (MWt). A steam turbine-generator will use this heat to provide a nominal gross electrical output of 1150 megawatts (MWe). The exhaust steam will be condensed by cooled water from six circular mechanical-draft cooling towers with water taken from and returned to the Columbia River. The information in this statement represents the second assessment of the environmental impact associated with the WNP-2 pursuant to the guidelines of the National Environmental Policy Act of 1969 (NEPA) and 10 CRF Part 51 of the Commission's Regulations. After receiving an application to construct this plant, the staff carried out a review of impacts that would occur during its construction and operation. That evaluation was issued as a Final Environmental Statement (construction phase). The construction of Unit 2 about 86% complete. The staff estimated a fuel-loading date of September 1983. In March 1977, the applicant applied for an operating license for the unit and submitted the required safety and environmental reports in support of the application. 20 figs., 19 tabs

  18. In Brief: Geoengineering draft statement

    Science.gov (United States)

    Showstack, Randy

    2009-04-01

    The American Meteorological Society (AMS) has prepared a draft policy statement on geoengineering the climate system, which the AMS Council is considering for approval. The statement notes, “Geoengineering will not substitute for either aggressive mitigation or proactive adaptation. It could contribute to a comprehensive risk management strategy to slow climate change and alleviate its negative impacts, but the potential for adverse and unintended consequences implies a need for adequate research, appropriate regulation, and transparent consideration.” The statement, if adopted, indicates that AMS recommends enhanced research on the scientific and technological potential for geoengineering the climate system; additional study of the historical, ethical, legal, political, and societal aspects of the geoengineering issues; and the development and analysis of policy options to promote transparency and international cooperation in exploring geoengineering options along with restrictions on reckless efforts to manipulate the climate system. AMS is accepting comments on the draft statement until 23 April. For more information, visit http://ametsoc.org/policy/draftstatements/index.html#draft.

  19. Standarized input for Hanford environmental impact statements. Part II: site description

    International Nuclear Information System (INIS)

    Jamison, J.D.

    1982-07-01

    Information is presented under the following section headings: summary description; location and physiography; geology; seismology; hydrology; meteorology; ecology; demography and land use; and radiological condition. Five appendixes are included on the 100N, 200 east, 200 west, 300, and 400 areas. This report is intended to provide a description of the Hanford Site against which the environmental impacts of new projects at Hanford can be assessed. It is expected that the summary description amplified with material from the appropriate appendix, will serve as the basic site description section of environmental impact statements prepared to address the requirements of the National Environmental Policy Act

  20. Best practices for preparing vessel internals segmentation projects

    International Nuclear Information System (INIS)

    Boucau, Joseph; Segerud, Per; Sanchez, Moises

    2016-01-01

    Westinghouse has been involved in reactor internals segmentation activities in the U.S. and Europe for 30 years. Westinghouse completed in 2015 the segmentation of the reactor vessel and reactor vessel internals at the Jose Cabrera nuclear power plant in Spain and a similar project is on-going at Chooz A in France. For all reactor dismantling projects, it is essential that all activities are thoroughly planned and discussed up-front together with the customer. Detailed planning is crucial for achieving a successful project. One key activity in the preparation phase is the 'Segmentation and Packaging Plan' that documents the sequential steps required to segment, separate, and package each individual component, based on an activation analysis and component characterization study. Detailed procedures and specialized rigging equipment have to be developed to provide safeguards for preventing certain identified risks. The preparatory work can include some plant civil structure modifications for making the segmentation work easier and safer. Some original plant equipment is sometimes not suitable enough and need to be replaced. Before going to the site, testing and qualification are performed on full scale mock-ups in a specially designed pool for segmentation purposes. The mockup testing is an important step in order to verify the function of the equipment and minimize risk on site. This paper is describing the typical activities needed for preparing the reactor internals segmentation activities using under water mechanical cutting techniques. It provides experiences and lessons learned that Westinghouse has collected from its recent projects and that will be applied for the new awarded projects. (authors)

  1. 76 FR 21401 - Notice of Availability of the Draft EIS for the HB In-Situ Solution Mine Project, Eddy County, NM

    Science.gov (United States)

    2011-04-15

    ...] Notice of Availability of the Draft EIS for the HB In-Situ Solution Mine Project, Eddy County, NM AGENCY... prepared a Draft Environmental Impact Statement (EIS) for the HB In- Situ Solution Mine Project, and by... considered, the BLM must receive written comments on the HB In-Situ Solution Mine Project Draft EIS within 60...

  2. HyLights: Preparation of the Large-Scale Demonstration Projects on Hydrogen for Transport in Europe

    International Nuclear Information System (INIS)

    Ulrich Bunger; Volker Blandow; Volker Jaensch; Harm Jeeninga; Cristina Morte Gomez

    2006-01-01

    The strategically important project HyLights has been launched by the European Commission in preparation of the large scale demonstration projects in transition to hydrogen as a fuel and long-term renewable energy carrier. HyLights, monitors concluded/ongoing demonstration projects and assists the planning of the next demonstration project phase, putting a clear focus on hydrogen in transport. HyLights is a coordination action that comprises 5 tasks to: 1) develop an assessment framework for concluded/ongoing demonstration projects, 2) analyse individual projects and establish a project database, 3) carry out a gaps analysis and prepare a requirement profile for the next stage projects, 4) assess and identify necessary financial and legal steps in preparation of the new projects, and 5) develop a European Initiative for the Growth of Hydrogen for Transport (EIGHT). (authors)

  3. 77 FR 18997 - Rim Lakes Forest Restoration Project; Apache-Sitgreavese National Forest, Black Mesa Ranger...

    Science.gov (United States)

    2012-03-29

    ... DEPARTMENT OF AGRICULTURE Forest Service Rim Lakes Forest Restoration Project; Apache-Sitgreavese National Forest, Black Mesa Ranger District, Coconino County, AZ AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an environmental impact statement. SUMMARY: The U.S. Forest Service (FS) will...

  4. 78 FR 14117 - Draft Environmental Impact Statement/Environmental Impact Report for Yolo Bypass Salmonid Habitat...

    Science.gov (United States)

    2013-03-04

    ...The Bureau of Reclamation and California Department of Water Resources intend to prepare an environmental impact statement/ environmental impact report (EIS/EIR) for the implementation of actions I.6.1 and I.7 identified in the National Marine Fisheries Service's 2009 Biological Opinion and Conference Opinion on the Long-term Operation of the Central Valley Project and State Water Project Reasonable and Prudent Alternative. These actions consist of salmonid habitat restoration efforts within the lower Sacramento River basin and fish passage through the Yolo Bypass. We are seeking suggestions and information on the alternatives and topics to be addressed and any other important issues related to the proposed action.

  5. 76 FR 65746 - Notice of Availability of Joint Final Environmental Impact Statement/Final Environmental Impact...

    Science.gov (United States)

    2011-10-24

    ...In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), and the Federal Land Policy and Management Act of 1976, as amended (FLPMA), the Bureau of Land Management (BLM) and the California Public Utilities Commission (CPUC) have prepared a Final Environmental Impact Statement (EIS) and Final Environmental Impact Report (EIR) as a joint environmental analysis document for Tule Wind, LLC's Tule Wind Project (Tule Project) and the San Diego Gas and Electric's (SDG&E) East County Substation Project (ECO Project) and by this notice are announcing the availability of the Final EIS/EIR. By this Notice the BLM is also segregating the public lands within the Tule Project application area from appropriation under the public land laws including the Mining Law, but not the Mineral Leasing or Material Sales Act, for a period of 2 years.

  6. 24 CFR 58.37 - Environmental impact statement determinations.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Environmental impact statement... Classification § 58.37 Environmental impact statement determinations. (a) An EIS is required when the project is... and Urban Development ENVIRONMENTAL REVIEW PROCEDURES FOR ENTITIES ASSUMING HUD ENVIRONMENTAL...

  7. CORPORATE SOCIAL REPORTING AS APPENDIX TO FINANCIAL STATEMENT

    Directory of Open Access Journals (Sweden)

    I. Derun

    2015-10-01

    Full Text Available The paper deals with essence and importance of corporate social reporting in the management of business entity management. The study examines several approaches for providing data about economic, ecological and social aspects of the companies. There are approaches of formulating of separated reports as addition to financial statements (for example Value Added Statement, Intellectual Capital Statement and integrated reporting. The article examines positive and negative factors that could significantly influence the implementation process of corporate social reporting for companies in Ukraine and around the world. Principles of corporate social reporting are considered. The research analyzes methodical approaches of preparing of integrating statements for large companies and data needs of stakeholders for making effective management decisions.

  8. 10 CFR 51.80 - Draft environmental impact statement-materials license.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.80 Draft environmental impact statement—materials license. (a) The NRC staff will either prepare a draft environmental...

  9. 23 CFR 771.123 - Draft environmental impact statements.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Draft environmental impact statements. 771.123 Section... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.123 Draft environmental impact statements. (a) A... significant impacts on the environment. When the applicant, after consultation with any project sponsor that...

  10. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Volume 4: Chapters 8 through 13

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains chapters 8--13 of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment. Attention is focused on the following: effects of oil on the physical, biological, and human environments; effects of noise on the biological and human environments; cumulative effects on the environment; and comparison of project alternatives and their impacts

  11. Klickitat Cogeneration Project: Final environmental assessment

    International Nuclear Information System (INIS)

    1994-09-01

    To meet BPA's contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA's proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact)

  12. Klickitat Cogeneration Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

  13. 76 FR 54767 - Environmental Impact Statements; Notice of Availability

    Science.gov (United States)

    2011-09-02

    ... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-8998-8] Environmental Impact Statements; Notice of....epa.gov/compliance/nepa/ . Weekly Receipt of Environmental Impact Statements Filed 08/22/2011 Through... the Chemistry and Metallurgy Research Replacement Project, To Address New Geologic Information...

  14. 75 FR 25309 - Environmental Impact Statement: Cook County, IL

    Science.gov (United States)

    2010-05-07

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement: Cook... FHWA is issuing this Notice to advise the public that an Environmental Impact Statement (EIS) will be... project comprises several elements of the overall Chicago Region Environmental and Transportation...

  15. 75 FR 81264 - Public Utility District No. 1 of Douglas County; Notice of Intent To Prepare an Environmental...

    Science.gov (United States)

    2010-12-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2149-152] Public Utility District No. 1 of Douglas County; Notice of Intent To Prepare an Environmental Impact Statement December 16, 2010. On May 27, 2010, Public Utility District No. 1 of Douglas County filed an application for the...

  16. Draft Environmental Impact Statement: Proposed Tenaska, Washington II Generation Project

    International Nuclear Information System (INIS)

    1993-08-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Power Partners, Inc. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and evaluated in the Environmental Impact Statement (EIS) include: potential air quality impacts such as emissions and their contribution to the ''greenhouse'' effect; potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields, and potential water quality impacts such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is particularly controversial. The EIS is being mailed to numerous agencies, groups, and individuals. There will be a 45-day comment period, during which a Public Hearing will be held

  17. Final environmental statement related to the operation of South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499)

    International Nuclear Information System (INIS)

    1986-08-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with the operation of the South Texas Project, Units 1 and 2, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environmental impacts, environmental consequences and mitigating actions, and environmental and economic benefits and costs associated with station operation. Land use and terrestrial and aquatic ecological impacts will be small. No operational impacts to historic and archeological sites are anticipated. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. Socioeconomic impacts of the project are anticipated to be minimal. The action called for is the issuance of an operating license for South Texas Project, Units 1 and 2

  18. 77 FR 74479 - Environmental Impacts Statements; Notice of Availability

    Science.gov (United States)

    2012-12-14

    ... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9006-5] Environmental Impacts Statements; Notice of....epa.gov/compliance/nepa/ . Weekly receipt of Environmental Impact Statements Filed 12/03/2012 Through... Transit Project, Construction-Related Potential Impacts on Business Revenue, St. Paul and Twin Cities...

  19. 78 FR 4586 - Environmental Impact Statement: Kake Access, AK

    Science.gov (United States)

    2013-01-22

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement: Kake... Environmental Impact Statement (EIS) for a proposed transportation project to improve access to and from the... written comments on environmental concerns that should be addressed in the EIS. The public scoping...

  20. 75 FR 8047 - Notice of Intent To Prepare a Joint Environmental Impact Statement and Environmental Impact...

    Science.gov (United States)

    2010-02-23

    ...Pursuant to the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA), the U.S. Army Corps of Engineers, Sacramento District (USACE) intends to prepare a joint environmental impact statement/environmental impact report (EIS/EIR) for the Lower Walnut Creek General Reevaluation Report (LWCGRR). USACE will serve as lead agency for compliance with NEPA, and the Contra Costa County Flood Control and Water Conservation District (CCCFCWCD) will serve as lead agency for compliance with CEQA. The LWCGRR will evaluate alternatives, including a locally preferred plan, for providing flood risk management and ecosystem restoration along the northern portion of the Walnut Creek watershed in the Central Coast of California. The approximate drainage area of the proposed action and analysis is 180 square miles.

  1. 13 CFR 124.602 - What kind of annual financial statement must a Participant submit to SBA?

    Science.gov (United States)

    2010-01-01

    ... statements prepared by a licensed independent public accountant within 90 days after the close of the concern... independent public accountant, verified as to accuracy by an authorized officer, partner, limited liability... must submit to SBA audited annual financial statements prepared by a licensed independent public...

  2. 77 FR 32626 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Impact...

    Science.gov (United States)

    2012-06-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF09-8-000] Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Impact Statement for the Planned Rockaway Delivery Lateral Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings The staff of the Federa...

  3. 78 FR 38024 - Magnolia LNG, LLC; Liquefied Natural Gas Limited; Notice of Intent To Prepare an Environmental...

    Science.gov (United States)

    2013-06-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF13-9-000] Magnolia LNG, LLC; Liquefied Natural Gas Limited; Notice of Intent To Prepare an Environmental Impact Statement for the Planned Magnolia Liquefied Natural Gas Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meeting The staff of...

  4. 78 FR 52197 - Office of the Assistant Secretary for Financial Resources, Statement of Organization, Functions...

    Science.gov (United States)

    2013-08-22

    ... the preparation and submission of consolidated financial statements for the Department based upon the...; (4) Provides financial statement review and analyses for the OPDIV and Department consolidated... the consolidated financial statements; (4) Supports the maintenance and operation of Department...

  5. 10 CFR 51.76 - Draft environmental impact statement-limited work authorization.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-limited work...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Production and Utilization Facilities § 51.76 Draft environmental impact statement—limited work authorization. The NRC will prepare a...

  6. 77 FR 49792 - Environmental Impacts Statements; Notice of Availability

    Science.gov (United States)

    2012-08-17

    ... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9004-5] Environmental Impacts Statements; Notice of....epa.gov/compliance/nepa/ . Weekly receipt of Environmental Impact Statements Filed 08/06/2012 Through..., USFS, CA, On Top Hazardous Fuels Reduction Project, To Disclose the Environmental Effects of a Federal...

  7. 75 FR 41163 - Notice of Intent To Prepare an Environmental Impact Statement and Overseas Environmental Impact...

    Science.gov (United States)

    2010-07-15

    ...Pursuant to section 102 of the National Environmental Policy Act (NEPA) of 1969, as implemented by the Council on Environmental Quality Regulations (40 Code of Federal Regulations [CFR] Parts 1500- 1508), and Executive Order 12114, the Department of the Navy (DON) announces its intent to prepare an Environmental Impact Statement (EIS) and Overseas EIS (OEIS) to evaluate the potential environmental effects associated with military readiness training and research, development, testing, and evaluation (RDT&E) activities (hereinafter referred to as ``training and testing'' activities) conducted within the Atlantic Fleet Training and Testing (AFTT) study area. The AFTT study area includes the western North Atlantic Ocean along the east coast of North America (including the area where the Undersea Warfare Training Range will be used), the Chesapeake Bay, and the Gulf of Mexico. Also included are select Navy pierside locations and channels. The AFTT study area does not include the Arctic. This EIS and OEIS is being prepared to renew and combine current regulatory permits and authorizations; address current training and testing not covered under existing permits and authorizations; and to obtain those permits and authorizations necessary to support force structure changes and emerging and future training and testing requirements. The DON will invite the National Marine Fisheries Service to be a cooperating agency in preparation of this EIS and OEIS.

  8. Standarized input for Hanford environmental impact statements. Part II: site description

    Energy Technology Data Exchange (ETDEWEB)

    Jamison, J.D.

    1982-07-01

    Information is presented under the following section headings: summary description; location and physiography; geology; seismology; hydrology; meteorology; ecology; demography and land use; and radiological condition. Five appendixes are included on the 100N, 200 east, 200 west, 300, and 400 areas. This report is intended to provide a description of the Hanford Site against which the environmental impacts of new projects at Hanford can be assessed. It is expected that the summary description amplified with material from the appropriate appendix, will serve as the basic site description section of environmental impact statements prepared to address the requirements of the National Environmental Policy Act (NEPA).

  9. 7 CFR 1221.113 - Financial statements.

    Science.gov (United States)

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING... INFORMATION ORDER Sorghum Promotion, Research, and Information Order Sorghum Promotion, Research, and Information Board § 1221.113 Financial statements. (a) As requested by the Secretary, the Board shall prepare...

  10. Statement to the 34th session of the general conference of the International Atomic Energy Agency, 17 September 1990. Statement to the 45th session of the United Nations general assembly, 23 October 1990

    International Nuclear Information System (INIS)

    Blix, H.

    1991-01-01

    The document contains the following two statements of Hans Blix, Director General of the IAEA: Statement to the 34th Session of the General Conference of the International Atomic Energy Agency, 17 September 1990; Statement to the 45th Session of the United Nations General Assembly, 23 October 1990. A separate abstract was prepared for each of these statements

  11. Statement to the 35th session of the General Conference of the International Atomic Energy Agency 16 September 1991; Statement to the 46th session of the United Nations General Assembly 21 October 1991

    International Nuclear Information System (INIS)

    Blix, H.

    1991-01-01

    The document contains the following two statements of Hans Blix, Director General of the IAEA: Statement to the 35th session of the General Conference of the International Atomic Energy Agency, 16 September 1991; Statement to the 46th session of the United Nations General Assembly, 21 October 1991. A separate abstract was prepared for each of these statements

  12. Preparation for Instruction. A Module of Instruction in Teacher Education. Prepared for Project RAFT.

    Science.gov (United States)

    Handley, Herbert M., Ed.

    This module, developed by the Research Applications for Teaching (RAFT) project, was written to assist students to write lesson plans that are effective and interactive. Students are given directions for the preparation of behavioral objectives and for the selection of appropriate instructional methodologies to meet the widely varying needs of…

  13. 77 FR 21722 - Gore Creek Restoration Project; Intent To Prepare an Environmental Impact Statement

    Science.gov (United States)

    2012-04-11

    ... District Ranger, P.O. Box 7, Yampa, Colorado 80483 or email comments to comments-rocky-mountain-medicine... causing adverse impacts to stream networks within the project boundary. Proposed Action The Yampa Ranger..., road decommissioning, new road construction, and dispersed campsite decommissioning along streams...

  14. Final Environmental Impact Statement to construct and operate a facility to receive, store, and dispose of 11e.(2) byproduct material near Clive, Utah (Docket No. 40-8989)

    International Nuclear Information System (INIS)

    1993-08-01

    A Final Environmental Impact Statement (FEIS) related to the licensing of Envirocare of Utah, Inc.'s proposed disposal facility in Tooele county, Utah (Docket No. 40-8989) for byproduct material as defined in Section 11e.(2) of the Atomic Energy Act, as amended, has been prepared by the Office of Nuclear Material Safety and Safeguards. This statement describes and evaluates the purpose of and need for the proposed action, the alternatives considered, and the environmental consequences of the proposed action. The NRC has concluded that the proposed action evaluated under the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51, is to permit the applicant to proceed with the project as described in this Statement

  15. 23 CFR 635.118 - Payroll and weekly statements.

    Science.gov (United States)

    2010-04-01

    ... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.118 Payroll and weekly statements. For all projects... contract provisions for the project, are to be retained by the STD for the time period pursuant to 49 CFR...

  16. Conforth Ranch (Wanaket) Wildlife Mitigation Project. Draft Management Plan and Draft Environmental Assessment

    International Nuclear Information System (INIS)

    1995-03-01

    Bonneville Power Administration (BPA) proposes to mitigate for loss of wildlife habitat caused by the development of Columbia River Basin hydroelectric projects, including McNary dam. The proposed wildlife mitigation project involves wildlife conservation on 1140 hectares (ha)(2817 acres) of land (including water rights) in Umatilla County, Oregon. BPA has prepared an Environmental Assessment (EA)(DOE/EA- 1016) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI)

  17. General writing-information packet for the environmental impact project

    International Nuclear Information System (INIS)

    Raaen, H.P.

    1975-02-01

    The information packet was prepared primarily for internal use at Holifield National Laboratory. The contents include suggestions to authors of environmental statements; format of environmental statements; formats of references given in environmental statements; preparation of SELECTED BIBLIOGRAPHY; troublesome words; glossary; abbreviations, initialisms, and symbols; and MT/ST taping procedure. (U.S.)

  18. 48 CFR 307.7108 - Statement of work.

    Science.gov (United States)

    2010-10-01

    ... ACQUISITION PLANNING ACQUISITION PLANNING Acquisition Plan 307.7108 Statement of work. (a) General. An SOW... of the project and the importance of the project to the overall program objectives. (3) A detailed... shall specify separately the work requirements to implement information security management requirements...

  19. Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 3: Appendices

    International Nuclear Information System (INIS)

    1995-11-01

    Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains Appendices A--I which contain the following: glossary/abbreviations; scoping report; structure coordinate summary; air quality; biological resources; geology; noise; visual contrast rating forms; and cultural resources

  20. 77 FR 74470 - Intent to Prepare an Environmental Impact Statement (EIS) for the Donlin Gold Project

    Science.gov (United States)

    2012-12-14

    ... impacts associated with the proposed Donlin Gold Project, which would be an open pit, hardrock gold mine... proposing the development of an open pit, hardrock gold mine located 277 miles west of Anchorage, 145 miles.... Major project components include excavation of an open pit, that ultimately would be approximately 2.2...

  1. B827 Chemical Synthhesis Project - Industrial Control System Integration - Statement of Work & Specification with Attachments 1-14

    Energy Technology Data Exchange (ETDEWEB)

    Wade, F. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2017-04-21

    The Chemical Synthesis Pilot Process at the Lawrence Livermore National Laboratory (LLNL) Site 300 827 Complex will be used to synthesize small quantities of material to support research and development. The project will modernize and increase current capabilities for chemical synthesis at LLNL. The primary objective of this project is the conversion of a non-automated hands-on process to a remoteoperation process, while providing enhanced batch process step control, stored recipe-specific parameter sets, process variable visibility, monitoring, alarm and warning handling, and comprehensive batch record data logging. This Statement of Work and Specification provides the industrial-grade process control requirements for the chemical synthesis batching control system, hereafter referred to as the “Control System” to be delivered by the System Integrator.

  2. 75 FR 18572 - Supplemental Environmental Impact Statement for Sequoyah Nuclear Plant Units 1 and 2 License...

    Science.gov (United States)

    2010-04-12

    ... TENNESSEE VALLEY AUTHORITY Supplemental Environmental Impact Statement for Sequoyah Nuclear Plant... National Environmental Policy Act. TVA will prepare a supplemental environmental impact statement (SEIS) to update information in the 1974 Final Environmental Statement for Sequoyah Nuclear Plant Units 1 and 2...

  3. 77 FR 16258 - Notice of Public Scoping Meetings on an Environmental Impact Statement for Proposed Outer...

    Science.gov (United States)

    2012-03-20

    ... an Environmental Impact Statement for Proposed Outer Continental Shelf Gulf of Mexico Eastern... initiating in preparation for completing an Environmental Impact Statement (EIS) under the National... and Gas Lease Sale 224: Eastern Planning Area, Final Supplemental Environmental Impact Statement (OCS...

  4. Willow Creek Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1995-04-01

    Today's notice announces BPA's proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA's obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council's 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI

  5. 2007 Posture Statement, Army Reserve: An Operational Force

    National Research Council Canada - National Science Library

    Stultz, Jack C

    2007-01-01

    The 2007 Army Reserve Posture Statement describes how the Army Reserve continues to transform from a strategic reserve to an operational force, meeting today's challenges as it better prepares for future uncertainties...

  6. Final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project. Volume 3: Chapters 5 through 7

    International Nuclear Information System (INIS)

    1999-02-01

    BP Exploration (Alaska) Inc. (BPXA) submitted a permit application to the US Army Engineer District, Alaska to initiate the review process for BPXA's plans to develop and produce oil and gas from the Northstar Unit. This report contains chapters 5--7 of an Environmental Impact Statement which was undertaken to identify and evaluate the potential effects the proposed project may have on the environment. Attention is focused on the effects of oil on the physical, biological, and human environments

  7. Guidebook on environmental impact assessment for in situ leach mining projects

    International Nuclear Information System (INIS)

    2005-05-01

    Assessment of the potential environmental impact of an in situ leach (ISL) project is the first step in the permission and licensing process. An Environmental Impact Assessment (EIA) serves as the basis for preparing an Environmental Impact Statement (EIS), which in turn identifies the potential environmental and socioeconomic impact of a proposed project and outlines measures to mitigate the impact. The EIS review process serves to inform the public about a proposed project as well as provide regulatory agencies with assurance that ISL technology will comply with environmental standards, and that project sites can be rehabilitated to pre-mining use. This publication provides a step-by-step description of project parameters that must be addressed in conducting an EIA and preparing an EIS. It also includes EIA/EIS case histories for current operations in Australia, the Czech Republic, Kazakhstan and the United States of America. The publication will be useful to companies considering development of ISL projects and to regulatory personnel who are responsible for writing environmental regulations and licensing ISL projects

  8. Technical project of complex fast cycle heat treatment of hydrogenous coal preparation

    OpenAIRE

    Moiseev, V. A.; Andrienko, V. G.; Pileckij, V. G.; Urvancev, A. I.; Gvozdyakov, Dmitry Vasilievich; Gubin, Vladimir Evgenievich; Matveev, Aleksandr Sergeevich; Savostiyanova, Ludmila Viktorovna

    2015-01-01

    Problems of heat-treated milled hydrogenous coal preparation site creation in leading fast cycle heat treatment complex were considered. Conditions for effective use of electrostatic methods of heat-treated milled hydrogenous coal preparation were set. Technical project of heat treatment of milled hydrogenous coal preparation site was developed including coupling of working equipment complex on fast heat treatment and experimental samples of equipment being designed for manufacturing. It was ...

  9. Coyote Springs Cogeneration Project, Morrow County, Oregon: Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    BPA is considering whether to transfer (wheel) electrical power from a proposed privately-owned, combustion-turbine electrical generation plant in Oregon. The plant would be fired by natural gas and would use combined-cycle technology to generate up to 440 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Portland General Electric Company (PGE). The project would be built in eastern Oregon, just east of the City of Boardman in Morrow County. The proposed plant would be built on a site within the Port of Morrow Industrial Park. The proposed use for the site is consistent with the County land use plan. Building the transmission line needed to interconnect the power plant to BPA`s transmission system would require a variance from Morrow County. BPA would transfer power from the plant to its McNary-Slatt 500-kV transmission line. PGE would pay BPA for wheeling services. Key environmental concerns identified in the scoping process and evaluated in the draft Environmental Impact Statement (DEIS) include these potential impacts: (1) air quality impacts, such as emissions and their contributions to the {open_quotes}greenhouse{close_quotes} effect; (2) health and safety impacts, such as effects of electric and magnetic fields, (3) noise impacts, (4) farmland impacts, (5) water vapor impacts to transportation, (6) economic development and employment impacts, (7) visual impacts, (8) consistency with local comprehensive plans, and (9) water quality and supply impacts, such as the amount of wastewater discharged, and the source and amount of water required to operate the plant. These and other issues are discussed in the DEIS. The proposed project includes features designed to reduce environmental impacts. Based on studies completed for the DEIS, adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial.

  10. Beverley project: draft environmental impact statement

    International Nuclear Information System (INIS)

    1982-07-01

    The Beverley deposit is located on the northern Lake Frome Plains, South Australia, 520km north of Adelaide. It is proposed to mine the deposit by in-situ leaching and to process the solution on the surface to produce an estimated 11,600t of yellowcake from about 6 million tonnes of 0.27% ore over approximately 23 years. The draft environmental impact statement is intended to cover all stages of the development from the pilot plant to final rehabilitation. Sections include the existing environment (geology, climate and meteorology, soils, hydrology, ecology, radionuclide base levels, land use, population and sites of Aboriginal and archaeological significance), the proposed development (solution mining, waste management, water management and mining and processing options), rehabilitation, environmental impact and environmental management and monitoring

  11. 12 CFR 620.2 - Preparing and filing the reports.

    Science.gov (United States)

    2010-01-01

    ... annual and quarterly financial statements on a combined or consolidated basis shall also include in the...: (a) Copies of each report required by this part, including financial statements and related schedules... from accounting policies of the combined or consolidated statements. (2) Any bank that prepares its...

  12. 77 FR 40144 - Adoption of the Environmental Impact Statement (EIS) and Participation in the Section 106...

    Science.gov (United States)

    2012-07-06

    ...) obligations related to MTA's request for financing for the East Side Access project through the FRA Railroad... Statement (EIS) and Participation in the Section 106 Programmatic Agreement for the East Side Access Project... adoption and recirculation of the Final Environmental Impact Statement for the East Side Access Project and...

  13. Fuel Receiving and Storage Station. Nuclear Regulatory Commission's final environmental statement

    International Nuclear Information System (INIS)

    1976-01-01

    The following items are covered: the site, the station, environmental effects of site preparation and station construction, environmental effects of station operation, effluent and environmental monitoring programs, environmental effects of accidents, need for BFRSS, benefit-cost analysis of alternatives, generic environmental impact statements, and discussion of and response to comments received on the draft environmental statement

  14. Safety research experiment facilities, Idaho National Engineering Laboratory, Idaho. Final environmental impact statement

    International Nuclear Information System (INIS)

    Liverman, J.L.

    1977-09-01

    This environmental statement was prepared for the Safety Research Experiment Facilities (SAREF) Project. The purpose of the proposed project is to modify some existing facilities and provide a new test facility at the Idaho National Engineering Laboratory (INEL) for conducting fast breeder reactor (FBR) safety experiments. The SAREF Project proposal has been developed after an extensive study which identified the FBR safety research needs requiring in-reactor experiments and which evaluated the capability of various existing and new facilities to meet these needs. The proposed facilities provide for the in-reactor testing of large bundles of prototypical FBR fuel elements under a wide variety of conditions, ranging from those abnormal operating conditions which might be expected to occur during the life of an FBR power plant to the extremely low probability, hypothetical accidents used in the evaluation of some design options and in the assessment of the long-term potential risk associated with wide-acale deployment of the FBR

  15. Proposed Casey's Pond Improvement Project, Fermi National Accelerator Laboratory

    International Nuclear Information System (INIS)

    1995-05-01

    The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA), evaluating the impacts associated with the proposed Casey's Pond Improvement Project at the Fermi National Accelerator Laboratory (Fermilab) in Batavia, Illinois. The improvement project would maximize the efficiency of the Fermilab Industrial Cooling Water (ICW) distribution system, which removes (via evaporation) the thermal load from experimental and other support equipment supporting the high energy physics program at Fermilab. The project would eliminate the risk of overheating during fixed target experiments, ensure that the Illinois Water Quality Standards are consistently achieved and provide needed additional water storage for fire protection. Based on the analysis in the EA, the DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement is not required

  16. On the preparation of environmental impact statements in the United States of America

    Science.gov (United States)

    Carson, James E.

    The National Environmental Policy Act of 1969 (NEPA) requires that an Environmental Impact Statement (FIS) be prepared whenever a federal action is considered that could result in a significant impact on the environment. Such actions include the issuance of construction or operating licenses for nuclear facilities and power plants, hydroelectric dams, or the diversion of water from rivers and lakes. An EIS is usually required if federal funds are involved. The U.S. Environmental Protection Agency and U.S. Council for Environmental Quality have developed guidelines and regulations for the preparation of an EIS. An EIS is not a scientific report. It is a legal document whose primary function is its use by decision-making agencies in approving or not approving the proposed federal action. The EIS is also used to inform the public and other government agencies of the environmental impacts of the proposed facility. The NEPA process allows public input into the decision-making process. An EIS should be short and concise, analytical, conclusory, be written for a non-technical audience, discuss the pros and cons of the proposed facility, and examine the impacts of all alternatives to the proposed action. The EIS should identify all adverse environmental impacts that cannot be avoided. The conclusions reached in the EIS should be clearly stated and supported by discussions and data in the text and by references to show that the agency has made the necessary analyses. The paper discusses the purpose and contents of these documents and the environmental procedures used in the U.S.A., especially as they relate to nuclear power plants.

  17. 75 FR 54177 - Notice of Availability of Draft Environmental Impact Statement for the Tonopah Solar Energy...

    Science.gov (United States)

    2010-09-03

    ... Statement for the Tonopah Solar Energy Crescent Dunes Solar Energy Project, Nye County, NV AGENCY: Bureau of... Environmental Impact Statement (EIS) for the Crescent Dunes Solar Energy Project, Nye County, Nevada, and by... considered, the BLM must receive written comments on the Crescent Dunes Solar Energy Project Draft EIS within...

  18. 17 CFR 210.3-10 - Financial statements of guarantors and issuers of guaranteed securities registered or being...

    Science.gov (United States)

    2010-04-01

    ... substantially duplicate disclosure elsewhere in the parent company's consolidated financial statements; and (12) Where the parent company's consolidated financial statements are prepared on a comprehensive basis other... included elsewhere in the reconciliation of the consolidated financial statements. [65 FR 51707, Aug. 24...

  19. Report to Congress: Expressions of interest in commercial clean coal technology projects in foreign countries

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This report was prepared in response to the guidance provided by the Congress in the course of the Fiscal Year 1995 appropriations process for the Department of Energy`s (DOE) Office of Fossil Energy (FE). As described in detail below, DOE was directed to make the international dissemination of Clean Coal Technologies (CCTs) an integral part of its policy to reduce greenhouse gas emissions in developing countries. Congress directed DOE to solicit ``Statements of Interest`` in commercial projects employing CCTs in countries projected to have significant growth in greenhouse gas emissions. Additionally, DOE was asked to submit to the Congress a report that analyzes the information contained in the Statements of Interest, and that identifies the extent to which various types of Federal incentives would accelerate the commercial availability of these technologies in an international context. In response to DOE`s solicitation of 18 November 1994, 77 Statements of Interest were received from 33 companies, as well as five additional materials. The contents of these submittals, including the requested Federal incentives, the CCTs proposed, the possible host countries, and the environmental aspects of the Statements of Interest, are described and analyzed in the chapters that follow.

  20. ILK statement about the BMU project of updating nuclear rules and regulations

    International Nuclear Information System (INIS)

    2007-01-01

    In 2003, the German Federal Ministry for the Environment (BMU) started its ''Updating Nuclear Rules and Regulations'' project. Proposals to this effect are currently in revision phase B. They comprise a total of eleven main topics, referred to as modules, under the heading of ''Basic Principles of Safety of Nuclear Power Plants - Safety Requirements in Accordance with the State of the Art.'' The International Nuclear Technology Committee (ILK), in 2005, dealt with the requirements to be met in an up-to-date code of nuclear rules and regulations. Its findings were published in a total of 10 recommendations. The current revision B of the 11 modules contains no discernible incorporation of these recommendations. ILK therefore once more dealt with the BMU project. A summary of its deliberations is available. ILK finds that the safety requirements to be met by nuclear power plants as outlined in the BMU draft are unable to support the implementation of the German Atomic Energy Act. In earlier statements, ILK had written that it deemed updating the code of rules and regulations desirable. The existing draft contains many elements serving this purpose, such as the inclusion of off-power conditions and a more pronounced incorporation of matters of organization and management. The main shortcomings of the present draft are identified and analyzed. (orig.)

  1. 78 FR 73559 - Moose-Wilson Corridor Comprehensive Management Plan, Environmental Impact Statement, Grand Teton...

    Science.gov (United States)

    2013-12-06

    ...-Wilson Corridor Comprehensive Management Plan, Environmental Impact Statement, Grand Teton National Park... is preparing a Comprehensive Management Plan and Environmental Impact Statement (EIS) for the Moose...; (2) distinguish the corridor's fundamental and other important resources and values; (3) clearly...

  2. Environmental Assessment for the Warren Station externally fired combined cycle demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    The proposed Penelec project is one of 5 projects for potential funding under the fifth solicitation under the Clean Coal Technology program. In Penelec, two existing boilers would be replaced at Warren Station, PA; the new unit would produce 73 MW(e) in a combined cycle mode (using both gas-fired and steam turbines). The project would fill the need for a full utility-size demonstration of externally fire combined cycle (EFCC) technology as the next step toward commercialization. This environmental assessment was prepared for compliance with NEPA; its purpose is to provide sufficient basis for determining whether to prepare an environmental impact statement or to issue a finding of no significant impact. It is divided into the sections: purpose and need for proposed action; alternatives; brief description of affected environment; environmental consequences, including discussion of commercial operation beyond the demonstration period.

  3. Is Capitalization of Operating Lease Way to Increase of Comparability of Financial Statements Prepared in Accordance with IFRS and US GAAP?

    Directory of Open Access Journals (Sweden)

    Hana Bohušová

    2015-01-01

    Full Text Available The paper is concerned with an evaluation of possibilities of companies using operating lease and prepared financial statements under IFRS or US GAAP comparison. The data of non-financial companies listed on the Prague Stock Exchange and reporting information on operating lease in accordance with IAS 17 are used. The study presents the impact of operating lease capitalization on companies’ financial statements and financial analysis ratios. The results show a negative impact of operating lease capitalization on financial analysis ratios. The study was motivated by a common effort of the International Accounting Standards Board (IASB and the Financial Accounting Standards Board (FASB to develop the common standard for Lease reporting. In 2013, a joint exposure dra of standard (ED2013/6 Leases was published. Under the new standard, it is required to capitalize all lease agreements over one year. The distinction between operating leases and finance leases should not exist anymore. The study was carried out to demonstrate the potential impact resulting from the proposed adoption of the new accounting standard concerning mandatory capitalization of all lease contracts.

  4. Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 2: Comments and responses

    International Nuclear Information System (INIS)

    1995-11-01

    Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains public comments which were received on the Draft EIR/S. Significant issues may be identified through public and agency comments

  5. Test report for run-in acceptance testing of Project W-151 300 HP mixing pumps

    International Nuclear Information System (INIS)

    Berglin, B.G.

    1998-01-01

    This report documents the results of a performance demonstration and operational checkout of three 300 HP mixer pumps in accordance with WHC-SD-WI51-TS-001 ''Mixer Pump Test Specification for Project W-151'' and Statement of Work 8K520-EMN-95-004 ''Mixer Pump Performance Demonstration at MASF'' in the 400 Area Maintenance and Storage Facility (MASF) building. Testing of the pumps was performed by Fast Flux Test Facility (FFTF) Engineering and funded by the Tank Waste Remediation System (TWRS) Project W-151. Testing began with the first pump on 04-01-95 and ended with the third pump on 11-01-96. Prior to testing, the MASF was modified and prepared to meet the pump testing requirements set forth by the Test Specification and the Statement of Work

  6. 76 FR 70480 - Otay River Estuary Restoration Project, South San Diego Bay Unit of the San Diego Bay National...

    Science.gov (United States)

    2011-11-14

    ... River Estuary Restoration Project, South San Diego Bay Unit of the San Diego Bay National Wildlife...), intend to prepare an environmental impact statement (EIS) for the proposed Otay River Estuary Restoration... any one of the following methods. Email: [email protected] . Please include ``Otay Estuary NOI'' in the...

  7. Presentation of Financial Statements According to IPSAS - a Challenge for Professional Accountants

    Directory of Open Access Journals (Sweden)

    Carmen Cretu

    2011-05-01

    Full Text Available The International Public Sector Accounting Standards (IPSAS is an important step in public sectoraccounting reform. Problems arising in the context of adopting a common language through IPSAS aremultiple and not easy to prove their usefulness, advantages and disadvantages of using them, so aim will bethe countries' agreement to accept and adopt these regulations. The preparation of financial statements is acomplex process of aggregating data to form economic and financial indicators. Content and preparation ofthe financial statements differ by type of institution, according to their kinds, depending on how their fundingand business profile. The financial statements of public institutions are particularly broad, complex andlengthy, and the information it provides can often be interpreted only by the professional accountant. Theprofessional accountant is the only one capable of ensuring providing appropriate information to users thatthey base their decisions on the allocation of funds.

  8. 76 FR 13363 - Intent To Prepare an Environmental Impact Statement for the Port of Gulfport Expansion Project...

    Science.gov (United States)

    2011-03-11

    ... Gulfport Harbor Navigation Project was adopted by the River and Harbors Act approved on July 3, 1930 (House... (House Document Number 112, 81st Congress, 1st session). Construction of the existing Gulfport Harbor... repositioning the Port into a sustainable, world-class maritime facility for future generations. This project is...

  9. 49 CFR 520.34 - Comments on environmental statements prepared by other agencies.

    Science.gov (United States)

    2010-10-01

    ... systems, traffic congestion, threats to health, or other consequences adverse to the environmental goals... changes in vehicular or pedestrian access. b. Statement of the “national, State or local significance” of...

  10. 76 FR 57720 - Notice of Intent To Prepare an Environmental Impact Statement/Overseas Environmental Impact...

    Science.gov (United States)

    2011-09-16

    ...The Department of the Navy published a document in the Federal Register (76 FR 174) on September 8, 2011, concerning public scoping meetings to support the development of an Environmental Impact Statement/Overseas Environmental Impact Statement for the Mariana Islands Training and Testing Study Area. The document contained an incorrect scoping date.

  11. 76 FR 21329 - Humboldt-Toiyabe National Forest; Nevada; Environmental Impact Statement for Geothermal Leasing...

    Science.gov (United States)

    2011-04-15

    ... at 1340 Financial Blvd, Reno, NV 89502, is a cooperating agency for this NEPA analysis. Responsible... Impact Statement for Geothermal Leasing on the Humboldt-Toiyabe National Forest AGENCY: Forest Service, USDA. ACTION: Notice of Intent to prepare an environmental impact statement. SUMMARY: The Humboldt...

  12. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  13. 12 CFR 630.4 - Responsibilities for preparing the report to investors.

    Science.gov (United States)

    2010-01-01

    ... statements on a consolidated basis with its subsidiaries, consolidated financial data of the bank and its... Systemwide combined financial statements and notes thereto, and such other disclosures, supplemental... information needed for preparation of the Systemwide combined financial statements and disclosures required to...

  14. HIFS VNL Monthly Progress Report Preparation for NDCX-II Project

    International Nuclear Information System (INIS)

    Logan, Grant; Kwan, Joe; Barnard, John; Friedman, Alex; Gilson, Erik; Leitner, Matthaeus; Waldron, Will; Bieniosek, Frank

    2009-01-01

    In preparation for the project and for anticipated review in August, the HIFS-VNL hosted an NDCX-II Advisory Meeting at LBNL on May 27, 2009. A number of experts in accelerator physics, engineering, and construction were asked to visit for a full day, listen to presentations on the project, its goals, and its status, and to offer their advice on how best to proceed, what topics needed attention, and what technical options seemed most attractive to them. This was a productive meeting, and the Committee's comments will provide useful guidance.

  15. Salt Lake City Area Integrated Projects: Rate adjustment: Environmental assessment

    International Nuclear Information System (INIS)

    1990-08-01

    The Department of Energy (DOE) has determined that the proposed firm power rate increase for the Salt Lake City Area Integrated Projects (Integrated Projects) power would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA, 42 USC 4321, et seq.) and, as such, does not require the preparation of an environmental impact statement (EIS). This determination is based on an environmental assessment (EA) prepared by the Western Area Power Administration (Western) dated August 1990 (DOE/EA-0457). The EA identifies and evaluates the potential environmental and socioeconomic effects of the proposed action, and based on the analysis contained therein, DOE concludes that the impacts to the human environment resulting from the implementation of the rate increase would be insignificant

  16. BPA/Puget Power Northwest Washington Transmission Project. Supplemental Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1995-04-01

    Bonneville Power Administration and Puget Sound Power ampersand Light Company propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit County area between the towns of Custer and Sedro Woolley, including within the City of Bellingham, starting in 1995. The upgrades of the interconnected 230-kV and 115-kV systems are needed to increase the import capacity on a nearby U.S.-Canada 500-kV intertie by about 850 megawatts (MW). BPA and Puget Power would share the increase in north-south transfer capability. An existing BPA 230-kV single-circuit, wood-pole H-frame transmission line would be upgraded to a 230-kV lattice-steel double-circuit line. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993. New 1994 studies showed that other improvements to Puget Power's system, and the addition of local generation has lessened local reliability problems. Also in 1994, BPA reevaluated all existing projects with this goal in mind. BPA and Puget determined that benefits would still result from this project, and that additional transfer capacity and improved system integrity warrant the expenditures. Given the changes in need, BPA decided to issue a Supplemental DEIS, and provide a second public review-and-comment period. The proposed action is designated Option 1. Impacts would be low to moderate and localized. Effects on soils and water resources in sensitive areas would be low to moderate; there would be little increase in magnetic fields, noise levels would approximate existing levels; and land use and property value impacts would be low. Threatened and endangered species would not be adversely affected, and all proposed Sections in wetlands would be covered by Nationwide Permit. Visual and socioeconomic impacts would be low to moderate. No cultural resources listed on the National Register of Historic Places would be affected

  17. Statement on the identity of apple snails

    DEFF Research Database (Denmark)

    Baker, R.; Candresse, T.; Dormannsné Simon, E.

    2012-01-01

    Following a request by the European Commission, EFSA’s Panel on Plant Health was asked to deliver a statement to clarify the current scientific knowledge regarding the identity of the apple snails in the context of the evaluation of the pest risk analysis prepared by the Spanish Ministry of Envir...

  18. Fiscal Year 2015 U.S. Government Financial Statements: Need to Address the Governments Remaining Financial Management Challenges and Long Term Fiscal Path

    Science.gov (United States)

    2016-04-06

    consolidated financial statements (governmentwide financial statements ). Unless these...the U.S. government’s fiscal year 2015 consolidated financial statements (governmentwide financial statements ), which is included in the Financial ...Processes Used to Prepare the U.S. Consolidated Financial Statements , GAO-15-630 (Washington, D.C.: July 30, 2015). A detailed discussion of

  19. Zachary-Fort Lauderdale pipeline construction and conversion project: final supplement to final environmental impact statement. Docket No. CP74-192

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-05-01

    This Final Supplement to the Final Environmental Impact Statement (Final Supplement) evaluates the economic, engineering, and environmental aspects of newly developed alternatives to an abandonment/conversion project proposed by Florida Gas Transmission Company (Florida Gas). It also updates the staff's previous FEIS and studies revisions to the original proposal. Wherever possible, the staff has adopted portions of its previous FEIS in lieu of reprinting portions of that analysis which require no change. 60 references, 8 figures, 35 tables.

  20. 77 FR 46516 - Notice of Availability of the Final Environmental Impact Statement, Including a Programmatic...

    Science.gov (United States)

    2012-08-03

    ... Impact Statement, Including a Programmatic Agreement, for the Clark, Lincoln, and White Pine Counties...) has prepared a Final Environmental Impact Statement (EIS) and a Programmatic Agreement (PA), which is.... 100 N., Nephi Beaver Library, 55 W. Center St., Beaver FOR FURTHER INFORMATION CONTACT: Penny Woods...

  1. 76 FR 34097 - Notice of Availability of the Draft Environmental Impact Statement, Including a Draft...

    Science.gov (United States)

    2011-06-10

    ... Impact Statement, Including a Draft Programmatic Agreement, for the Clark, Lincoln, and White Pine...) has prepared a Draft Environmental Impact Statement (EIS) and a Draft Programmatic Agreement (PA.... 100 N., Nephi Beaver Library, 55 W. Center St., Beaver. The Draft EIS describes and analyzes SNWA's...

  2. 77 FR 68813 - Notice of Availability of the Draft Environmental Impact Statement and Environmental Impact...

    Science.gov (United States)

    2012-11-16

    ...In accordance with the National Environmental Policy Act of 1969, as amended (NEPA); the Federal Land Policy and Management Act of 1976, as amended; and the California Environmental Quality Act of 1970 (CEQA); the Bureau of Land Management (BLM) Bishop Field Office, Bishop, California; the United States Forest Service (USFS) Inyo National Forest; and the Great Basin Unified Air Pollution Control District (GBUAPCD) (a California state agency) have prepared a Draft Environmental Impact Statement (EIS)/Environmental Impact Report (EIR) for the proposed Casa Diablo IV Geothermal Development Project near the Town of Mammoth Lakes in Mono County, California. This notice announces the opening of the public comment period.

  3. Statements of work for FY 1995 to 2000

    International Nuclear Information System (INIS)

    Mann, F.M.

    1995-01-01

    The activities and tasks needed to successfully prepare an interim, preliminary, and final performance assessment on the disposal of the low-level fraction of Hanford tank wastes are given. Included are analytic, experimental, computational, writing, and approval tasks. These statements of work will be revised annually

  4. A River Model Intercomparison Project in Preparation for SWOT

    Science.gov (United States)

    David, C. H.; Andreadis, K.; Famiglietti, J. S.; Beighley, E.; Boone, A. A.; Yamazaki, D.; Paiva, R. C. D.; Fleischmann, A. S.; Collischonn, W.; Fisher, C. K.; Kim, H.; Biancamaria, S.

    2017-12-01

    The Surface Water and Ocean Topography (SWOT) mission is currently scheduled to launch at the beginning of next decade. SWOT is expected to retrieve unprecedented measurements of water extent, elevation, and slope in the largest terrestrial water bodies. Such potential transformative information motivates the investigation of our ability to ingest the associated data into continental-scale models of terrestrial hydrology. In preparation for the expected SWOT observations, an inter-comparison of continental-scale river models is being performed. This comparison experiment focuses on four of the world's largest river basins: the Amazon, the Mississippi, the Niger, and the Saint-Lawrence. This ongoing project focuses on two main research questions: 1) How can we best prepare for the expected SWOT continental to global measurements before SWOT even flies?, and 2) What is the added value of including SWOT terrestrial measurements into global hydro models for enhancing our understanding of the terrestrial water cycle and the climate system? We present here the results of the second year of this project which now includes simulations from six numerical models of rivers over the Mississippi and sheds light on the implications of various modeling choices on simulation quality as well as on the potential impact of SWOT observations.

  5. 75 FR 57286 - Notice of Availability of the Final Environmental Impact Statement for the NextLight Renewable...

    Science.gov (United States)

    2010-09-20

    ... solar field and infrastructure would consist of fixed panels, an underground and overhead electrical... Statement for the NextLight Renewable Power, LLC, Silver State Solar Project, Clark County, NV AGENCY... Statement (EIS) for the Silver State Solar Project, Clark County, Nevada, and by this notice is announcing...

  6. ETF Mission Statement document. ETF Design Center team

    International Nuclear Information System (INIS)

    1980-04-01

    The Mission Statement document describes the results, activities, and processes used in preparing the Mission Statement, facility characteristics, and operating goals for the Engineering Test Facility (ETF). Approximately 100 engineers and scientists from throughout the US fusion program spent three days at the Knoxville Mission Workshop defining the requirements that should be met by the ETF during its operating life. Seven groups were selected to consider one major category each of design and operation concerns. Each group prepared the findings of the assigned area as described in the major sections of this document. The results of the operations discussed must provide the data, knowledge, experience, and confidence to continue to the next steps beyond the ETF in making fusion power a viable energy option. The results from the ETF mission (operations are assumed to start early in the 1990's) are to bridge the gap between the base of magnetic fusion knowledge at the start of operations and that required to design the EPR/DEMO devices

  7. ETF Mission Statement document. ETF Design Center team

    Energy Technology Data Exchange (ETDEWEB)

    1980-04-01

    The Mission Statement document describes the results, activities, and processes used in preparing the Mission Statement, facility characteristics, and operating goals for the Engineering Test Facility (ETF). Approximately 100 engineers and scientists from throughout the US fusion program spent three days at the Knoxville Mission Workshop defining the requirements that should be met by the ETF during its operating life. Seven groups were selected to consider one major category each of design and operation concerns. Each group prepared the findings of the assigned area as described in the major sections of this document. The results of the operations discussed must provide the data, knowledge, experience, and confidence to continue to the next steps beyond the ETF in making fusion power a viable energy option. The results from the ETF mission (operations are assumed to start early in the 1990's) are to bridge the gap between the base of magnetic fusion knowledge at the start of operations and that required to design the EPR/DEMO devices.

  8. 75 FR 34666 - Stream Protection Rule; Environmental Impact Statement

    Science.gov (United States)

    2010-06-18

    ... rule means that we will need to prepare a new environmental impact statement rather than the supplement.... Establishing corrective action thresholds. Land Forming and Fill Optimization. Revising the backfilling and... Original Contour Exceptions. Limiting variances and exceptions from approximate original contour...

  9. Contractibility of financial statement information prepared under IFRS: Evidence from debt contracts around IFRS adoption

    OpenAIRE

    Shivakumar, L; Ball, R; Li, X

    2015-01-01

    We outline several properties of IFRS that potentially affect the contractibility or the transparency of financial statement information, and hence the use of that information in debt contracts. Those properties include the increased choice among accounting rules IFRS gives to managers, enhanced rule-making uncertainty, and increased emphasis on fair value accounting. Consistent with reduced contractibility of IFRS financial statement information, we find a significant reduction in accounting...

  10. Draft environmental statement related to the operation of South Texas Project, Units 1 and 2 (Docket Nos. 50-498 and 50-499). Houston Lighting and Power Company

    International Nuclear Information System (INIS)

    1986-03-01

    This Draft Environmental Statement contains the second assessment of the environmental impact associated with the operation of the South Texas Project, Units 1 and 2, pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the ''Code of Federal Regulations,'' Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environmental impacts, environmental consequences and mitigating actions, and environmental and economic benefits and costs associated with station operation. Land use and terrestrial and aquatic ecological impacts will be small. No operational impacts to historic and archaeological sites are anticipated. The effects of routine operations, energy transmission, and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. Socioeconomic impacts of the project are anticipated to be minimal. The action called for is the issuance of an operating license for South Texas Project, Units 1 and 2

  11. Risk management of PPP project in the preparation stage based on Fault Tree Analysis

    Science.gov (United States)

    Xing, Yuanzhi; Guan, Qiuling

    2017-03-01

    The risk management of PPP(Public Private Partnership) project can improve the level of risk control between government departments and private investors, so as to make more beneficial decisions, reduce investment losses and achieve mutual benefit as well. Therefore, this paper takes the PPP project preparation stage venture as the research object to identify and confirm four types of risks. At the same time, fault tree analysis(FTA) is used to evaluate the risk factors that belong to different parts, and quantify the influencing degree of risk impact on the basis of risk identification. In addition, it determines the importance order of risk factors by calculating unit structure importance on PPP project preparation stage. The result shows that accuracy of government decision-making, rationality of private investors funds allocation and instability of market returns are the main factors to generate the shared risk on the project.

  12. Superconducting Super Collider: Final environmental impact statement: Volume 1

    International Nuclear Information System (INIS)

    1988-12-01

    This Environmental Impact Statement (EIS) provides as much information as possible at this stage of the project development regarding the potential environmental impacts of the proposed construction and operation of a Superconducting Super Collider (SSC) at each of the site alternatives. However, the DOE recognizes that further review under the National Environmental Policy Act (NEPA) is required prior to construction and operation of the proposed SSC project at the selected site based on more detailed design and to identify specific mitigation measures which can be incorporated into final design. Accordingly, following selection of a site for the proposed SSC, the DOE will prepare a Supplemental EIS to address in more detail the impacts of constructing and operating the proposed SSC at the selected site and alternatives for mitigating those impacts. To measure the effects of constructing the SSC at any of the seven alternative sites, the DOE determined which aspects of the human environment would be significantly affected. The EIS describes the baseline conditions at each of the seven site alternatives, the trends underway resulting in changes, the potential environmental impacts expected if the SSC were sited, possible mitigations of adverse impacts, and resulting residual adverse impacts

  13. Detached Statements

    Directory of Open Access Journals (Sweden)

    Mark McBride

    2018-04-01

    Full Text Available Joseph Raz has introduced an interesting class of statements —detached statements— into the philosophical lexicon. In brief, such statements are (informa- tive normative statements, yet the speaker does not, in so uttering them, express or convey acceptance of the point of view of the hearer to whom they are addressed (as contrasted with committed statements, where the speaker does express or convey such acceptance. I propose to offer a novel analysis of such statements (and to clear away some confusions about them. In brief, such statements will be analysed as wide-scope normative conditionals.

  14. 77 FR 24976 - Draft Environmental Impact Statement for the Proposed Spokane Tribe of Indians West Plains Casino...

    Science.gov (United States)

    2012-04-26

    ... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Draft Environmental Impact Statement for the Proposed Spokane Tribe of Indians West Plains Casino and Mixed Use Project, City of Airway Heights, Spokane... Impact Statement (DEIS) for the Spokane Tribe of Indians West Plains casino and mixed use project, City...

  15. 75 FR 72836 - Notice of Availability of Final Environmental Impact Statement for the Tonopah Solar Energy...

    Science.gov (United States)

    2010-11-26

    ... Statement for the Tonopah Solar Energy Crescent Dunes Solar Energy Project, Nye County, NV AGENCY: Bureau of... Statement (EIS) for the Crescent Dunes Solar Energy Project, Nye County, Nevada, and by this notice is... . SUPPLEMENTARY INFORMATION: Tonopah Solar Energy, LLC applied to the BLM for a 7,680-acre right-of-way (ROW) on...

  16. Organization of the Statutory Audit of Financial Statements in Romania

    Directory of Open Access Journals (Sweden)

    Gabriela Ungureanu

    2010-12-01

    Full Text Available Economic entities around the world, regardless of their membership - public or private sector - the size, the object of activity, prepare financial statements for presentation of financial information users (investors, creditors, customers, suppliers, public institutions. The financial statements provide information about financial position, performance and changes in financial position of an entity - information underlying to base decision process. For Romania, the financial audit was not a tradition. Recognized as a top area of the accounting profession, financial audit was legislated in 1999. Statutory audit, audit of annual financial statements or consolidated annual statements have been established 9 years later (Emergency Regulation no. 90 June 24, 2008, by transposing Directive 2006/43/EC of 17 May 2006 of the European Parliament and of Council on statutory audit of annual accounts and consolidated accounts, in order to ensure oversight of auditors, in the public interest.

  17. CONSOLIDATED FINANCIAL STATEMENTS IN UKRAINE: NORMATIVE AND LEGAL REGULATION STATE

    Directory of Open Access Journals (Sweden)

    S.V. Kucher

    2016-09-01

    Full Text Available The development of big business in Ukraine has led to the need to release a number of domestic companies and their groups and associations to the international financial market which was the prerequisite of the needs of users of financial statements to obtain reliable information about the activities of such companies. In accordance with the national legislation associations of enterprises and companies have to provide the consolidated financial statements which contain the pooled indices about the activities of these entities. The article analyzes the current state of normative and legal regulation of financial reporting consolidation process in Ukraine. In particular, the paper determines the basic legal acts of regulations of national and international governing process of preparation of consolidated financial statements; it also determines the circle of business entities required to draw up the consolidated financial statements solely in accordance with international financial reporting standards.

  18. Statement to the 38th session of the General Conference of the International Atomic Energy Agency 19 September 1994; Statement to the 49th session of the United Nations General Assemblies 17 October 1994

    International Nuclear Information System (INIS)

    Blix, H.

    1994-10-01

    The document reproduces the two statements of the IAEA Director General to the 38th Session of the General conference of the IAEA from 19 September 1994 and to the 49th Session of the United Nations General Assembly from 17 October 1994. A separate abstract was prepared for each statement

  19. Financial Reporting under GASB Statement No. 34 and ASBO International Certificate of Excellence Financial Reporting.

    Science.gov (United States)

    Heinfeld, Gary

    This guide presents a financial model that affects all governmental entities that issue financial statements in conformity with Generally Accepted Accounting Principles (GAAP). The model was prepared to provide school business officials specific examples of school system financial-statement presentations. The guide is divided into six chapters.…

  20. 76 FR 22917 - Dog Management Plan/Draft Environmental Impact Statement, Golden Gate National Recreation Area...

    Science.gov (United States)

    2011-04-25

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-PWR-PWRO--0315-696; 8145-8B90-SZM] Dog... Impact Statement/Dog Management Plan, Golden Gate National Recreation Area. SUMMARY: The National Park Service has prepared a Draft Dog Management Plan and Environmental Impact Statement (Plan/DEIS). The Plan...

  1. 76 FR 61106 - Notice of Intent To Prepare an Environmental Impact Statement

    Science.gov (United States)

    2011-10-03

    ... an Environmental Impact Statement Summary: In accordance with the National Environmental Policy Act... small agricultural community located in western Maryland. The campus is a component of the National... gsf. Approximately 199 people work at the NIH Animal Center site. A Master Plan is an integrated...

  2. International Association for Hospice and Palliative Care Position Statement: Euthanasia and Physician-Assisted Suicide.

    Science.gov (United States)

    De Lima, Liliana; Woodruff, Roger; Pettus, Katherine; Downing, Julia; Buitrago, Rosa; Munyoro, Esther; Venkateswaran, Chitra; Bhatnagar, Sushma; Radbruch, Lukas

    2017-01-01

    Reports about regulations and laws on Euthanasia and Physician Assisted Suicide (PAS) are becoming increasingly common in the media. Many groups have expressed opposition to euthanasia and PAS while those in favor argue that severely chronically ill and debilitated patients have a right to control the timing and manner of their death. Others argue that both PAS and euthanasia are ethically legitimate in rare and exceptional cases. Given that these discussions as well as the new and proposed laws and regulations may have a powerful impact on patients, caregivers, and health care providers, the International Association for Hospice and Palliative Care (IAHPC) has prepared this statement. To describe the position of the IAHPC regarding Euthanasia and PAS. The IAHPC formed a working group (WG) of seven board members and two staff officers who volunteered to participate in this process. An online search was performed using the terms "position statement", "euthanasia" "assisted suicide" "PAS" to identify existing position statements from health professional organizations. Only statements from national or pan-national associations were included. Statements from seven general medical and nursing associations and statements from seven palliative care organizations were identified. A working document including a summary of the different position statements was prepared and based on these, an initial draft was prepared. Online discussions among the members of the WG took place for a period of three months. The differences were reconciled by email discussions. The resulting draft was shared with the full board. Additional comments and suggestions were incorporated. This document represents the final version approved by the IAHPC Board of Directors. IAHPC believes that no country or state should consider the legalization of euthanasia or PAS until it ensures universal access to palliative care services and to appropriate medications, including opioids for pain and dyspnea. In

  3. Technical data summary supporting the spent nuclear fuel environmental impact statement, November 1993

    International Nuclear Information System (INIS)

    Geddes, R.L.; Claxton, R.E.; Lengel, J.D.

    1993-11-01

    This report has been compiled by the WSRC Nuclear Materials Processing Division's Planning Section at the request of the Office of Spent Fuel Management and Special Projects (EM-37) to support issuance of the Spent Nuclear Fuel Environmental Impact Statement. Savannah River site data evaluates five programmatic options including open-quotes No Actionclose quotes ranging up to transfer of all DOE responsibility spent fuel to the SRS. For each option, a range of management/disposition scenarios has been examined. Each case summary provides information relative to the technical proposal, technical issues, environmental impacts, and projected costs for a 50 period (to 2044) when it is assumed that the material will be dispositioned from the SRS. It must be recognized that this report was prepared under severe time constraints and contains many simplifications and assumptions. It is highly recommended that significant additional study be performed before basing key decisions upon the data contained in this report. It represents a best effort by a significant group of technical personnel familiar with nuclear materials processing, handlings and storage but it is likely that careful scrutiny will reveal numerous discrepancies and omissions. The bulk of the effort went into defining the engineering approaches necessary to execute the various mission scenarios. Collection and/or calculation of much of the various waste, emission, and utility consumption data, so important to an Environmental Impact Statement, has not been completed at this time

  4. Studies On The Materiality And Aggregation, Compensation And Offsetting In Financial Statements

    Directory of Open Access Journals (Sweden)

    Liana GADAU

    2016-04-01

    Full Text Available The accounting principles should be considered an essential element in the preparation and presentation of financial statements, with our analysis focusing especially on the relative principles: Materiality and aggregation, compensation and offsetting. We consider necessary to improve the analyzed concepts by bringing additional information, as clear and comprehensive as possible, information used as reference in the preparation of financial statements.  Moreover, is crucial to apply an unitary thinking of the accounting referential which is linked to these accounting principles. The research methods used in analyzing the principles are: documentation of theoretical study of normative acts in the field of accounting, observation, comparative analysis, synthesis, information classification and data interpretation.

  5. APPLICATION OF INTERNAL FINANCIAL STATEMENTS IN BUDGETARY USER MANAGEMENT IN CROATIA

    OpenAIRE

    Vesna Vašiček; Verica Budimir; Mirjana Hladika

    2011-01-01

    The subject of this paper is to investigate the level of use of the internal financial statements of budgetary users in their management process. The main objective of this paper is to determine the importance of internal financial statements prepared according to the specific requirements of managers in decision making and budgetary user management. Another goal of this paper is to assess the implications of using a wide range of accounting information on efficiency of budgetary users manag...

  6. 77 FR 17037 - Intent To Prepare a Draft Environmental Impact Statement for the Louisiana Coastal Area (LCA...

    Science.gov (United States)

    2012-03-23

    ... Environmental Impact Statement for the Louisiana Coastal Area (LCA)--Louisiana, Mississippi River Hydrodynamic... impact statement (EIS) for the Louisiana Coastal Area (LCA)--Louisiana, Mississippi River Hydrodynamic... tiered off of the November 2004, programmatic EIS for the Louisiana Coastal Area (LCA), Louisiana...

  7. Safety Research Experiment Facilities, Idaho National Engineering Laboratory, Idaho. Draft environmental statement

    International Nuclear Information System (INIS)

    1977-01-01

    This environmental statement was prepared in accordance with the National Environmental Policy Act of 1969 (NEPA) in support of the Energy Research and Development Administration's (ERDA) proposal for legislative authorization and appropriations for the Safety Research Experiment Facilities (SAREF) Project. The purpose of the proposed project is to modify some existing facilities and provide a new test facility at the Idaho National Engineering Laboratory (INEL) for conducting fast breeder reactor (FBR) safety experiments. The SAREF Project proposal has been developed after an extensive study which identified the FBR safety research needs requiring in-reactor experiments and which evaluated the capability of various existing and new facilities to meet these needs. The proposed facilities provide for the in-reactor testing of large bundles of prototypical FBR fuel elements under a wide variety of conditions, ranging from those abnormal operating conditions which might be expected to occur during the life of an FBR power plant to the extremely low probability, hypothetical accidents used in the evalution of some design options and in the assessment of the long-term potential risk associated with wide-scale deployment of the FBR

  8. 76 FR 21790 - Environmental Impact Statement: Interstate 66 Corridor, Virginia

    Science.gov (United States)

    2011-04-18

    ... prepare a Tier 1 Environmental Impact Statement, in cooperation with the Virginia Department of... and Environmental Team Leader, Federal Highway Administration, Post Office Box 10249, Richmond...: The Federal Highway Administration (FHWA), in cooperation with the Virginia Department of...

  9. PROJECT ENGINEERING DATA MANAGEMENT AT AUTOMATED PREPARATION OF DESIGN DOCUMENTATION

    Directory of Open Access Journals (Sweden)

    A. V. Guryanov

    2017-01-01

    Full Text Available We have developed and realized instrumental means for automated support of end-to-end design process for design documentation on a product at the programming level. The proposed decision is based on processing of the engineering project data that are contained in interdependent design documents: tactical technical characteristics of products, data on the valuable metals contained in them, the list of components applied in a product and others. Processing of engineering data is based on their conversion to the form provided by requirements of industry standards for design documentation preparation. The general graph of the design documentation developed on a product is provided. The description of the developed software product is given. Automated preparation process of interdependent design documents is shown on the example of preparation of purchased products list. Results of work can be used in case of research and development activities on creation of perspective samples of ADP equipment.

  10. 77 FR 1551 - Intent To Prepare an Environmental Impact Statement on the Bottineau Transitway Project From...

    Science.gov (United States)

    2012-01-10

    ... 25, 2012, from 5:30 to 7:30 p.m., at the Urban Research and Outreach/Engagement Center (UROC), 2001... does include major regional transit projects such as the Green Line (Central Corridor LRT and Southwest... limited-stop services, intersection improvements, and other focused infrastructure improvements that would...

  11. 77 FR 68748 - Intent To Prepare a Draft Environmental Impact Statement and Feasibility Report for the Cano...

    Science.gov (United States)

    2012-11-16

    ... recreation and tourism, with minimal temporary negative impact on the ecosystem and the adjacent communities... Environmental Impact Statement and Feasibility Report for the Cano Martin Pena Ecosystem Restoration, San Juan... Environmental Impact Statement (DEIS) and Feasibility Report (FR) for the ecosystem restoration of the Cano...

  12. 78 FR 7808 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Buffalo Valley...

    Science.gov (United States)

    2013-02-04

    ... amended, the Bureau of Land Management (BLM) Mount Lewis Field Office, Battle Mountain, Nevada, intends to... Buffalo Valley Mine Project, a proposed open pit gold mine, mill, and associated facilities, located on..._mountain_field.html . In order to be considered during the preparation of the Draft EIS, all comments must...

  13. Procurement of Architectural and Engineering Services for Sustainable Buildings: A Guide for Federal Project Managers

    Energy Technology Data Exchange (ETDEWEB)

    2004-06-01

    This guide was prepared to be a resource for federal construction project managers and others who want to integrate the principles of sustainable design into the procurement of professional building design and consulting services. To economize on energy costs and improve the safety, comfort, and health of building occupants, building design teams can incorporate daylighting, energy efficiency, renewable energy, and passive solar design into all projects in which these elements are technically and economically feasible. The information presented here will help project leaders begin the process and manage the inclusion of sustainable design in the procurement process. The section on establishing selection criteria contains key elements to consider before selecting an architectural and engineering (A/E) firm. The section on preparing the statement of work discusses the broad spectrum of sustainable design services that an A/E firm can provide. Several helpful checklists are included.

  14. 75 FR 19991 - Notice of Availability of the Final Environmental Impact Statement for the UNEV Refined Liquid...

    Science.gov (United States)

    2010-04-16

    ...-82385] Notice of Availability of the Final Environmental Impact Statement for the UNEV Refined Liquid...) has prepared a Proposed Resource Management Plan Amendment (RMPA)/Final Environmental Impact Statement..., Tooele, Juab, Millard, Beaver, Iron, and Washington Counties in Utah; and Lincoln and Clark Counties in...

  15. EGNOS Monitoring Prepared in Space Research Centre P.A.S. for SPMS Project

    Science.gov (United States)

    Swiatek, Anna; Jaworski, Leszek; Tomasik, Lukasz

    2017-12-01

    The European Geostationary Overlay Service (EGNOS) augments Global Positioning System (GPS) by providing correction data and integrity information for improving positioning over Europe. EGNOS Service Performance Monitoring Support (SPMS) project has assumed establishment, maintenance and implementation of an EGNOS performance monitoring network. The paper presents preliminary results of analyses prepared in Space Research Centre, Polish Academy of Sciences (Warsaw), as one of partners in SPMS project.

  16. EDF Energies Nouvelles. Consolidated financial statements at 31 December 2008 Prepared in accordance with IFRSs

    International Nuclear Information System (INIS)

    2009-01-01

    EDF Energies Nouvelles is a world leader in renewable energy electricity. The company develops, builds and operates clean energy power plants both for its own account and for third parties. Historically, EDF Energies Nouvelles primarily developed its business in two geographical areas, Europe and North America (U.S., Canada and Mexico). EDF Energies Nouvelles is a subsidiary of EDF, helping the Group to achieve its renewable energy goals. The EDF Group generates low-carbon electricity around the world and actively participates in the energy transition. EDF Energies Nouvelles prioritizes development of wind and photovoltaic solar capacity. As an integrated operator with global reach, EDF Energies Nouvelles covers the entire renewable energy chain, from development to operation and maintenance, and manages all project phases in-house. This document is EDF Energies Nouvelles's registration document for the year 2008. It contains information about Group profile, governance, business, investments, property, plant and equipment, management, financial position, employees, shareholders, etc. The document includes the group's consolidated financial statements at 31 December 2008

  17. EDF Energies Nouvelles. Consolidated financial statements at 31 December 2007 Prepared in accordance with IFRSs

    International Nuclear Information System (INIS)

    2008-01-01

    EDF Energies Nouvelles is a world leader in renewable energy electricity. The company develops, builds and operates clean energy power plants both for its own account and for third parties. Historically, EDF Energies Nouvelles primarily developed its business in two geographical areas, Europe and North America (U.S., Canada and Mexico). EDF Energies Nouvelles is a subsidiary of EDF, helping the Group to achieve its renewable energy goals. The EDF Group generates low-carbon electricity around the world and actively participates in the energy transition. EDF Energies Nouvelles prioritizes development of wind and photovoltaic solar capacity. As an integrated operator with global reach, EDF Energies Nouvelles covers the entire renewable energy chain, from development to operation and maintenance, and manages all project phases in-house. This document is EDF Energies Nouvelles's registration document for the year 2007. It contains information about Group profile, governance, business, investments, property, plant and equipment, management, financial position, employees, shareholders, etc. The document includes the group's consolidated financial statements at 31 December 2007

  18. EDF Energies Nouvelles. Consolidated financial statements at 31 December 2006 Prepared in accordance with IFRSs

    International Nuclear Information System (INIS)

    2007-01-01

    EDF Energies Nouvelles is a world leader in renewable energy electricity. The company develops, builds and operates clean energy power plants both for its own account and for third parties. Historically, EDF Energies Nouvelles primarily developed its business in two geographical areas, Europe and North America (U.S., Canada and Mexico). EDF Energies Nouvelles is a subsidiary of EDF, helping the Group to achieve its renewable energy goals. The EDF Group generates low-carbon electricity around the world and actively participates in the energy transition. EDF Energies Nouvelles prioritizes development of wind and photovoltaic solar capacity. As an integrated operator with global reach, EDF Energies Nouvelles covers the entire renewable energy chain, from development to operation and maintenance, and manages all project phases in-house. This document is EDF Energies Nouvelles's registration document for the year 2006. It contains information about Group profile, governance, business, investments, property, plant and equipment, management, financial position, employees, shareholders, etc. The document includes the group's Consolidated financial statements at 31 December 2006

  19. Usage of internal statements in making consolidated financial statement

    Directory of Open Access Journals (Sweden)

    V.N. Herman

    2016-12-01

    Full Text Available The emergence of the consolidated financial statements is the result of integration processes in the businesses that lead to pooling of different companies. As consolidated financial statements present an aggregated look at the financial position of a parent and its subsidiaries, they let you gauge the overall health of an entire group of companies as opposed to one company’s standalone position. Consolidation of financial statements requires from the participants of joining elaborating their individual statements. The article describes the general scheme of consolidation process and defines the key trends of consolidation adjustments, in particular, financial investments, internal operations, goodwill and exchange rate differences. It is found out that to get information about internal operations and financial investments such data have to be synthesized from internal statements. This approach allows using the same accounting methods to parent and subsidiary entities. The objects, the users and the subject domain of internal statements are determined in order to make consolidation of financial statements of joining.

  20. Partners in projects: preparing for public involvement in health and social care research.

    Science.gov (United States)

    Parkes, Jacqueline H; Pyer, Michelle; Wray, Paula; Taylor, Jane

    2014-09-01

    In recent years, several UK and, international funders of health and social care related research have adopted the policy of requiring explicit evidence of the 'public' voice in all aspects of project design. For many academic researchers engaged within research, evaluations or audit projects, this formal requirement to actively engage members of the public will present them with both benefits and challenges to securing knowledgeable, skilled, and confident lay representation onto project teams. This could potentially lead to the exploitation of those individuals who are available, appropriately informed, and adequately prepared for such activities. Currently, much of the preparation of patients or members of the public for research involvement tends to be aligned to specific projects; however, with the call for greater active and meaningful involvement of lay representatives in future national and international funding applications, there is clearly a growing need to 'train' sufficient numbers of confident and competent representatives to meet this growing demand. This paper describes the development of a specifically designed research awareness training programme and underpinning theoretical model, which has been specifically designed to support active and meaningful lay involvement in research, evaluations and audit projects. Developed over a four year period, the course is a culmination of learning extracted from a series of four completed research projects, which have incorporated an element of public and patient involvement (PPI) training in their overall design. Crown Copyright © 2014. Published by Elsevier Ireland Ltd. All rights reserved.

  1. Resource Contingency Program : Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-02-01

    In 1990, the Bonneville Power Administration (BPA) embarked upon the Resource Contingency Program (RCP) to fulfill its statutory responsibilities to supply electrical power to its utility, industrial and other customers in the Pacific Northwest. Instead of buying or building generating plants now, BPA has purchased options to acquire power later if needed. Three option development agreements were signed in September 1993 with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop Washington and near Hermiston, Oregon. This environmental impact statement addresses the environmental consequences of purchasing power from these options. This environmental impact statement addresses the environmental consequences of purchasing power from these options.

  2. Environmental Impact Statement. March 2011. Interim storage, encapsulation and final disposal of spent nuclear fuel

    Energy Technology Data Exchange (ETDEWEB)

    2011-07-01

    An Environmental Impact Statement (EIS) shall be prepared and submitted along with applications for permissibility and a licence under the Environmental Code and a licence under the Nuclear Activities Act for new nuclear facilities. This Environmental Impact Statement has been prepared by Svensk Kaernbraenslehantering AB (the Swedish Nuclear Fuel and Waste Management Co, SKB) to be included in the licence applications for continued operation of Clab (central interim storage facility for spent nuclear fuel) in Simpevarp in Oskarshamn Municipality and construction and operation of facilities for encapsulation (integrated with Clab) and final disposal of spent nuclear fuel in Forsmark in Oesthammar Municipality

  3. Environmental Impact Statement. March 2011. Interim storage, encapsulation and final disposal of spent nuclear fuel

    International Nuclear Information System (INIS)

    2011-01-01

    An Environmental Impact Statement (EIS) shall be prepared and submitted along with applications for permissibility and a licence under the Environmental Code and a licence under the Nuclear Activities Act for new nuclear facilities. This Environmental Impact Statement has been prepared by Svensk Kaernbraenslehantering AB (the Swedish Nuclear Fuel and Waste Management Co, SKB) to be included in the licence applications for continued operation of Clab (central interim storage facility for spent nuclear fuel) in Simpevarp in Oskarshamn Municipality and construction and operation of facilities for encapsulation (integrated with Clab) and final disposal of spent nuclear fuel in Forsmark in Oesthammar Municipality

  4. 78 FR 37846 - Resource Management Plan/General Plan and Environmental Impact Statement/Environmental Impact...

    Science.gov (United States)

    2013-06-24

    ...The Bureau of Reclamation and the California Department of Parks and Recreation (CDPR) have prepared a Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the San Luis Reservoir State Recreation Area Resource Management Plan/General Plan (RMP/GP). The Final EIS/EIR describes and presents the environmental effects of the No Action/No Project Alternative and three Action Alternatives for implementing the RMP/GP. A Notice of Availability of the Draft EIS/EIR was published in the Federal Register on August 3, 2012 (77 FR 46518). The comment period on the Draft EIS/EIR ended on October 2, 2012. The Final EIS/EIR contains responses to all comments received and reflects comments and any additional information received during the review period.

  5. 75 FR 54802 - Requirement of a Statement Disclosing Uncertain Tax Positions

    Science.gov (United States)

    2010-09-09

    ... return. Corporations that prepare financial statements are required by generally accepted accounting principles to identify and quantify all uncertain tax positions as described in Financial Accounting..., including International Financial Reporting Standards and country-specific generally accepted accounting...

  6. A Shift in Emphasis: Comments on CAE's New Mission Statement

    Science.gov (United States)

    Anderson-Levitt, Kathryn M.

    2007-01-01

    In a presidential address prepared for the 2006 Council on Anthropology and Education (CAE) meeting, I argue that the new mission statement for CAE represents not a new direction for the organization, but simply a shift in emphasis, albeit an important and timely shift.

  7. Environmental Assessment and Finding of No Significant Impact: Kalina Geothermal Demonstration Project Steamboat Springs, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-02-22

    The Department of Energy (DOE) has prepared an Environmental Assessment (EA) to provide the DOE and other public agency decision makers with the environmental documentation required to take informed discretionary action on the proposed Kalina Geothermal Demonstration project. The EA assesses the potential environmental impacts and cumulative impacts, possible ways to minimize effects associated with partial funding of the proposed project, and discusses alternatives to DOE actions. The DOE will use this EA as a basis for their decision to provide financial assistance to Exergy, Inc. (Exergy), the project applicant. Based on the analysis in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human or physical environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required and DOE is issuing this Finding of No Significant Impact (FONSI).

  8. Draft guidelines for the environmental impact study of the Great-Whale hydroelectric project

    International Nuclear Information System (INIS)

    1992-01-01

    The draft guidelines on the preparation of Hydro-Quebec's environmental and social impact statement for the proposed Great Whale River hydroelectric project are detailed. The guidelines cover project justification, description of the biophysical and social environments, project description, impacts of the project, mitigative measures, residual impacts and compensatory measures, environmental monitoring and follow-up programs. The proponent is asked to provide the justification for the project, including its general rationale, and to evaluate the long-term impact of the project. In justifying the project, the proponent should present energy demand and supply scenarios in sufficient detail to demonstrate the need for the project within the context of sustainable development. Long term impacts on the ecosystems of James Bay and Hudson Bay must be examined, as well as broad ecosystemic impacts such as those on the boreal forest, the tundra, as well as such considerations as global warming and changes in biological and cultural diversity

  9. 78 FR 42027 - Proposed Amendment To Advance Notice of Proposed Rulemaking for Pension Benefit Statements

    Science.gov (United States)

    2013-07-15

    ... Proposed Amendment To Advance Notice of Proposed Rulemaking for Pension Benefit Statements AGENCY: Employee... illustrations given to participants in defined contribution pension plans, such as 401(k) and 403(b) plans. The... Labor, 200 Constitution Avenue NW., Washington, DC 20210, Attention: Pension Benefit Statements Project...

  10. 77 FR 58531 - Notice of Intent To Prepare a Joint Environmental Impact Statement (EIS) for the Gateway Pacific...

    Science.gov (United States)

    2012-09-21

    ... social, economic, and environmental impacts of the projects and is intended to be sufficient in scope to... across streams. The Corps is preparing an EIS to analyze the potential social, economic, and...; land use; and aesthetics. c. The Corps will serve as the lead agency for compliance with NEPA, and...

  11. 77 FR 46768 - Notice of Intent To Prepare an Environmental Impact Statement for the Moapa Solar Energy Center...

    Science.gov (United States)

    2012-08-06

    ... Impact Statement for the Moapa Solar Energy Center on the Moapa River Indian Reservation, Clark County NV... Environmental Impact Statement (EIS) that evaluates a solar energy generation center on the Moapa River Indian... . SUPPLEMENTARY INFORMATION: The Proposed Action consists of constructing and operating a solar generation energy...

  12. Governmental Accounting in Rwanda : a case study with focus on the financial statements

    OpenAIRE

    Mwanaidi, Mari Claire

    2011-01-01

    The purpose of this thesis is to analyse the consolidated financial statements of the government of Rwanda for the year ended 31 December 2008. Two types of accounting are discussed namely, money accounts and accrual (profit) accounts. The aim is to discuss which accounting model is used to prepare the financial statements of Rwanda. We found out that, the accrual accounts (fund accounting) are used in Rwanda to report the money effects of revenues and expenditures. Accordingly, we introduce ...

  13. Experience in the Canadian programme in preparing for DGRs of all waste types. Preparing for Canada's DGR Projects

    International Nuclear Information System (INIS)

    Gierszewski, Paul

    2014-01-01

    Document available in abstract form only. Full text follows: The presentation gives an overview of two Canadian Deep Geologic Repository projects, and draws on this experience with respect to the Workshop topics of Issues for Construction, Preparing as an Organization, and Optimization. The first project is the Ontario Power Generation proposed DGR for Low and Intermediate Level Waste. This facility would be sited at the Bruce nuclear site near Kincardine, Ontario. The project is currently in the Environmental Assessment and Site Preparation and Construction Licensing stage. The second project is the Nuclear Waste Management Organisation's proposed DGR for used fuel. This facility is currently in the siting phase. This is a staged process to find a willing and informed host community. Currently several communities have indicated interest in learning more about the project and having an initial feasibility screening conducted on their area. Construction of a DGR is a large undertaking, with numerous technical topics to be addressed that may not be initially considered as part of conceptual design and initial postclosure safety assessment. Examples of construction issues that may affect the design are: - Site access (supplies, access, workforce, and infrastructure); - Shaft sinking approach, and ensuring it aligns with need for geo-scientific information and postclosure performance; - Local rock stresses impacting DGR design and layout; and - Regulations applicable to DGR and their implications. Examples of topics that need to be taken into account with respect to transition as an organization from a research or siting group to preparing to build a DGR are: - Staffing, and evolution of required skills; - Establishing appropriate Quality Assurance processes; - Establishing design / records management; Optimization proceeds in stages. During conceptual/preliminary design, there is iterative development of the safety case between geoscience, engineering and safety

  14. Feedback from D and D projects - Improvement through preparation

    International Nuclear Information System (INIS)

    Sykora, Alexandra; Arnold, Hans-Uwe; Clement, Gilles

    2016-01-01

    This paper describes feedback from AREVA's experience in all stages of decommissioning projects (from end of life to greenfield), focusing on the recommendations for initial actions to be taken early in the project and in the preparation phase. Such initiatives can be summarized in the following four points: (i) Build a strong and specific Decommissioning Team composed of the plant staff together with D and D specialists that shall take the lead and promote the culture change within the remaining staff; (ii) Insist on pre-work as well as real-time Radiological Characterization to optimize waste production; (iii) Develop a tailored Decommissioning Manual streamlined from the legacy Operation Manual (that is no longer appropriate); (iv) Replace the plant's legacy support systems (e.g. ventilation, water treatment, electricity, lighting etc.) with modular and lighter systems better fit for the D and D purpose and allowing to accelerate the cutting and knocking down ('straight backwards') operations. (authors)

  15. 77 FR 17051 - Environmental Impacts Statements; Notice of Availability

    Science.gov (United States)

    2012-03-23

    ... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9002-2] Environmental Impacts Statements; Notice of..., ME, I-395/Route 9 Transportation System, To Improve Transportation System Linkage, Safety, and... Safety Modification Project, To Remediate Seismic, Seepage, and Hydrologic Deficiencies in the Main Dam...

  16. 76 FR 57729 - Boundary Hydroelectric Project; Sullivan Creek Project; Notice of Availability of the Final...

    Science.gov (United States)

    2011-09-16

    ...-015] Boundary Hydroelectric Project; Sullivan Creek Project; Notice of Availability of the Final Environmental Impact Statement for the Relicensing of the Boundary Hydroelectric Project and the Surrender of... reviewed the applications for license for the Boundary Hydroelectric Project (FERC No. 2144-38), and the...

  17. 77 FR 45415 - Preparation of an Environmental Impact Statement for the Redlands; Passenger Rail Project in the...

    Science.gov (United States)

    2012-07-31

    ... work and recreational purposes, increased the number of hours of lost productivity, increased fuel... Westbound Communications (909-384-8188) at least 48 hours before the meeting. ADDRESSES: Written comments... feet wide, with a passing siding one-mile long located near the midpoint of the alignment. Project...

  18. Hanford science and technology needs statements, 2000

    International Nuclear Information System (INIS)

    BERLIN, G.T.

    1999-01-01

    This document: (a) provides a comprehensive listing of the Hanford sites science and technology needs for fiscal year (FY) 2000; and (b) identifies partnering and commercialization opportunities within industry, other federal and state agencies, and the academic community. These needs were prepared by the Hanford projects (within the Project Hanford Management Contract and the Environmental Restoration Contract) and subsequently reviewed and endorsed by the Hanford Site Technology Coordination Group (STCG). The STCG reviews included participation of DOE-RL Management, site stakeholders, state and federal regulators, and Tribal Nations. The Science and Technology Needs Document is organized by major problem areas and coincides with the STCG subgroups which are as follows: Deactivation and Decommissioning, Mixed Waste, Subsurface Contaminants, High Level Waste Tanks, and Spent Nuclear Fuel. Each problem area begins with a technology needs index table. This table is followed by detailed descriptions of each technology need, including a problem statement and current baseline information associated with that need. Following the technology need description for each problem area is a table listing the science needs, followed by detailed descriptions of the functional need and the problem to be solved as currently understood. Finally, a crosswalk table is provided at the end of each problem area which ties together last years needs and this years needs, provides brief justification for elimination of any needs, and identifies any other significant changes which took place during the revision process

  19. SOME ASPECTS REGARDING THE THEORIES OF CONSOLIDATED FINANCIAL STATEMENTS

    Directory of Open Access Journals (Sweden)

    Carmen NISTOR

    2015-04-01

    Full Text Available Although accounts consolidation was used in practice from the early 1900’s its theoretical basis were developed later in concordance with the rise of concepts like “entity” and “group”. The aim of this article is to examine the literature in the accounting field regarding the consolidation theories developed over the years. In order to discuss the different opinions regarding the consolidation theories we used the descriptive approach. As a result we tried to explain how these theories appeared and developed, respectively what consequences have their use in preparing consolidated financial statements. The results of the study suggest that every theory has certain aspects which differentiate it from the others in terms of recognition of subsidiary income and reporting net assets of the subsidiary. However, from all theories analyzed, the entity theory takes into account several guidelines of maximum importance when preparing consolidated financial statements: “You can’t own yourself!”, “You can’t owe yourself money!”, “You can’t make money selling to yourself.”

  20. 76 FR 13396 - Notice of Availability of the Draft Environmental Impact Statement for the Mountaineer Commercial...

    Science.gov (United States)

    2011-03-11

    ... DEPARTMENT OF ENERGY Notice of Availability of the Draft Environmental Impact Statement for the... potential environmental impacts of a project proposed by American Electric Power (AEP) Service Corporation...) announces the availability of the Draft Environmental Impact Statement for the Mountaineer Commercial Scale...

  1. Project W-236A, work plan for preparation of a design requirements document

    International Nuclear Information System (INIS)

    Groth, B.D.

    1995-01-01

    This work plan outlines the tasks necessary, and defines the organizational responsibilities for preparing a Design Requirements Document (DRD) for project W-236A, Multi-Function Waste Tank Facility (MWTF). A DRD is a Systems Engineering document which bounds, at a high level, the requirements of a discrete system element of the Tank Waste Remediation System (TWRS) Program. This system element is usually assigned to a specific project, in this case the MWTF. The DRD is the document that connects the TWRS program requirements with the highest level projects requirements and provides the project's link to the overall TWRS mission. The MWTF DRD effort is somewhat unique in that the project is already in detailed design, whereas a DRO is normally prepared prior to preliminary design. The MWTF design effort was initiated with a Functional Design Criteria (FDC) and a Supplemental Design Requirements Document (SDRD) bounding the high level requirements. Another unique aspect of this effort is that some of the TWRS program requirements are still in development. Because of these unique aspects of the MWTF DRD development, the MWTF will be developed from existing TWRS Program requirements and project specific requirements contained in the FDC and SDRD. The following list describes the objectives of the MWTF DRD: determine the primary functions of the tanks through a functional decomposition of the TWRS Program high level functions; allocate the primary functions to a sub-system architecture for the tanks; define the fundamental design features in terms of performance requirements for the system and subsystems; identify system interfaces and design constraints; and document the results in a DRD

  2. Determinants influencing differences of financial statements under Vietnamese accounting and international accounting: The case of Vietnam

    Directory of Open Access Journals (Sweden)

    Duc Tai Do

    2018-06-01

    Full Text Available This research is conducted for evaluating the impact levels of determinants affecting the differences of financial statements of FDI firms under Vietnamese Accounting (VA and International Ac-counting (IAS/IFRS. Data were collected by conducting survey of FDI firms and audit firms for the period from 2015 to 2017. Based on the quantitative data, multiple regression was employed for showing the influence levels of determinants on the variable of differences of financial reports. The results show that seven determinants had positive relationships with the differences of financial statements prepared by FDI under Vietnamese accounting and IAS/IFRS. Based on the findings, some recommendations are given for reducing fee of conversion of financial statements from Vietnamese accounting to international accounting, increasing the comparability of financial statements and improving information quality of financial statements.

  3. Hinkley Point 'C': a summary of the Environmental Statement

    International Nuclear Information System (INIS)

    1987-08-01

    The Environmental Statement describes the potentially significant environmental effects of the proposed pressurized water reactor station at Hinkley Point in Somerset, and the ways in which the Central Electricity Generating Board (CEGB) intends to avoid, reduce or remedy these effects. It also explains the CEGB's reasons for proposing a PWR at Hinkley Point. The Environmental Statement has been produced to inform local authorities, the public and the Secretary of State for Energy about the CEGB's proposals. The Secretary of State has to decide whether or not consent for construction of Hinkley Point 'C' power station should be given, and in reaching that decision has to consider, amongst other matters, the environmental effects of the project. This summary and the Environmental Statement also describe the CEGB's plans for developing Hinkley Point 'C. Some details are yet to be finalised and may be subject to change, but this will not affect the overall validity of the environmental analysis given in these documents. Greater detail can be found in the full Environmental Statement. (author)

  4. 78 FR 43224 - Notice of Availability of the Final Environmental Impact Statement for the Proposed Sun Valley to...

    Science.gov (United States)

    2013-07-19

    ....XXX; AZA35079] Notice of Availability of the Final Environmental Impact Statement for the Proposed Sun... Land Management (BLM) has prepared a Final Environmental Impact Statement (EIS) for the proposed Sun..., operate, and maintain a 500/230-kV overhead transmission line from the Sun Valley Substation to the Morgan...

  5. Compilation of the FY 1999 Department of the Navy Working Capital Fund Financial Statements

    National Research Council Canada - National Science Library

    2000-01-01

    ...) Cleveland Center consistently and accurately compiled and consolidated financial data received from Navy field organizations and other sources to prepare the FY 1999 Navy Working Capital Fund financial statements...

  6. 77 FR 61020 - Notice of Availability of Final Environmental Impact Statement for the Sigurd to Red Butte No. 2...

    Science.gov (United States)

    2012-10-05

    ...; UTU-83067] Notice of Availability of Final Environmental Impact Statement for the Sigurd to Red Butte... (BLM) has prepared a Final Environmental Impact Statement (EIS) for the Sigurd to Red Butte No. 2--345...; Utah School and Institutional Trust Lands Administration; Millard, Sevier, Beaver, Iron, and Washington...

  7. The first joint ESGAR/ ESPR consensus statement on the technical performance of cross-sectional small bowel and colonic imaging

    International Nuclear Information System (INIS)

    Taylor, S.A.; Torkzad, M.R.; Bhatnagar, G.; Avni, F.; Cronin, C.G.; Hoeffel, C.; Kim, S.H.; Laghi, A.; Napolitano, M.; Petit, P.; Rimola, J.; Tolan, D.J.; Zappa, M.; Puylaert, C.A.J.; Stoker, J.

    2017-01-01

    To develop guidelines describing a standardised approach to patient preparation and acquisition protocols for magnetic resonance imaging (MRI), computed tomography (CT) and ultrasound (US) of the small bowel and colon, with an emphasis on imaging inflammatory bowel disease. An expert consensus committee of 13 members from the European Society of Gastrointestinal and Abdominal Radiology (ESGAR) and European Society of Paediatric Radiology (ESPR) undertook a six-stage modified Delphi process, including a detailed literature review, to create a series of consensus statements concerning patient preparation, imaging hardware and image acquisition protocols. One hundred and fifty-seven statements were scored for agreement by the panel of which 129 statements (82 %) achieved immediate consensus with a further 19 (12 %) achieving consensus after appropriate modification. Nine (6 %) statements were rejected as consensus could not be reached. These expert consensus recommendations can be used to help guide cross-sectional radiological practice for imaging the small bowel and colon. (orig.)

  8. The first joint ESGAR/ ESPR consensus statement on the technical performance of cross-sectional small bowel and colonic imaging

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, S.A.; Torkzad, M.R.; Bhatnagar, G. [University College London, Centre for Medical Imaging, London (United Kingdom); Avni, F. [Lille University Hospitals, Department of Paediatric Imaging, Jeanne de Flandre Hospital, Lille (France); Cronin, C.G. [Mater Misericordiae University Hospital, Department of Radiology, Dublin (Ireland); Hoeffel, C. [Hopital Robert Debre, Department of Radiology, Reims (France); Kim, S.H. [Inje University College of Medicine, Haeundae Paik Hospital, Department of Radiology, Busan (Korea, Republic of); Laghi, A. [Sapienza University of Rome, I.C.O.T. Hospital, Department of Radiological Sciences, Oncology and Pathology, Latina (Italy); Napolitano, M. [V. Buzzi Children' s Hospital, Department of Radiology and Neuroradiology, Milan (Italy); Petit, P. [Timone Enfant Hospital, Department of Paediatric Radiology, Marseille (France); Rimola, J. [University of Barcelona, Radiology Department, Hospital Clinic Barcelona, Catalonia (Spain); Tolan, D.J. [St James' s University Hospital, Leeds Teaching Hospitals NHS Trust (United Kingdom); Zappa, M. [Hopital Beaujon, AP-HP, Universite Paris 7, INSERM CRI U1149, Department of Radiology, Clichy (France); Puylaert, C.A.J.; Stoker, J. [University of Amsterdam, Department of Radiology, Academic Medical Centre, Amsterdam (Netherlands)

    2017-06-15

    To develop guidelines describing a standardised approach to patient preparation and acquisition protocols for magnetic resonance imaging (MRI), computed tomography (CT) and ultrasound (US) of the small bowel and colon, with an emphasis on imaging inflammatory bowel disease. An expert consensus committee of 13 members from the European Society of Gastrointestinal and Abdominal Radiology (ESGAR) and European Society of Paediatric Radiology (ESPR) undertook a six-stage modified Delphi process, including a detailed literature review, to create a series of consensus statements concerning patient preparation, imaging hardware and image acquisition protocols. One hundred and fifty-seven statements were scored for agreement by the panel of which 129 statements (82 %) achieved immediate consensus with a further 19 (12 %) achieving consensus after appropriate modification. Nine (6 %) statements were rejected as consensus could not be reached. These expert consensus recommendations can be used to help guide cross-sectional radiological practice for imaging the small bowel and colon. (orig.)

  9. TFTR DT preparation project status

    Energy Technology Data Exchange (ETDEWEB)

    Perry, E.D.; Dudek, L.E.

    1993-11-01

    The Tokamak Fusion Test Reactor (TFTR) research program is preparing to commence the first high power Deuterium-Tritium (DT) experiments of the US Fusion Program. Hardware upgrades to TFTR required for DT operations have been completed. This paper discusses these hardware preparations.

  10. An Official American Thoracic Society Research Statement

    DEFF Research Database (Denmark)

    Slatore, Christopher G; Horeweg, Nanda; Jett, James R

    2015-01-01

    BACKGROUND: Pulmonary nodules are frequently detected during diagnostic chest imaging and as a result of lung cancer screening. Current guidelines for their evaluation are largely based on low-quality evidence, and patients and clinicians could benefit from more research in this area. METHODS......: In this research statement from the American Thoracic Society, a multidisciplinary group of clinicians, researchers, and patient advocates reviewed available evidence for pulmonary nodule evaluation, characterized six focus areas to direct future research efforts, and identified fundamental gaps in knowledge...... demographic and nodule characteristics with patient-level outcomes. Methods to share data from registries are also necessary. CONCLUSIONS: This statement may help researchers to develop impactful and innovative research projects and enable funders to better judge research proposals. We hope...

  11. 49 CFR Attachment 4 - State and Local Agency Review of Impact Statements

    Science.gov (United States)

    2010-10-01

    ... 4 Attachment 4 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL..., Attach. 4 Attachment 4—State and Local Agency Review of Impact Statements 1. OBM Revised Circular No. A... proposed project in the case of federally assisted projects (Part I of A-95) generally takes place prior to...

  12. Preparation of environmental analyses for synfuel and unconventional gas technologies

    Energy Technology Data Exchange (ETDEWEB)

    Reed, R.M. (ed.)

    1982-09-01

    Government agencies that offer financial incentives to stimulate the commercialization of synfuel and unconventional gas technologies usually require an analysis of environmental impacts resulting from proposed projects. This report reviews potentially significant environmental issues associated with a selection of these technologies and presents guidance for developing information and preparing analyses to address these issues. The technologies considered are western oil shale, tar sand, coal liquefaction and gasification, peat, unconventional gas (western tight gas sands, eastern Devonian gas shales, methane from coal seams, and methane from geopressured aquifers), and fuel ethanol. Potentially significant issues are discussed under the general categories of land use, air quality, water use, water quality, biota, solid waste disposal, socioeconomics, and health and safety. The guidance provided in this report can be applied to preparation and/or review of proposals, environmental reports, environmental assessments, environmental impact statements, and other types of environmental analyses. The amount of detail required for any issue discussed must, by necessity, be determined on a case-by-case basis.

  13. Native Hawaiian Ethnographic Study for the Hawaii Geothermal Project Proposed for Puna and Southeast Maui

    Energy Technology Data Exchange (ETDEWEB)

    Matsuoka, J.K; Minerbi, L. [Cultural Advocacy Network for Developing Options (CANDO) (United States); Kanahele, P.; Kelly, M.; Barney-Campbell, N.; Saulsbury [Oak Ridge National Lab., TN (United States); Trettin, L.D. [Tennessee Univ., Knoxville, TN (United States)

    1996-05-01

    This report makes available and archives the background scientific data and related information collected for an ethnographic study of selected areas on the islands of Hawaii and Maui. The task was undertaken during preparation of an environmental impact statement for Phases 3 and 4 of the Hawaii Geothermal Project (HGP) as defined by the state of Hawaii in its April 1989 proposal to Congress. Since the state of Hawaii is no longer pursuing or planning to pursue the HGP, DOE considers the project to be terminated. Information is included on the ethnohistory of Puna and southeast Maui; ethnographic fieldwork comparing Puna and southeast Maui; and Pele beliefs, customs, and practices.

  14. 78 FR 18325 - Intent To Prepare an Environmental Impact Statement (EIS) for the Formal Training Unit (FTU) and...

    Science.gov (United States)

    2013-03-26

    ... Statement (EIS) for the Formal Training Unit (FTU) and Main Operating Base 1 (MOB 1) for the Beddown of KC... Statement (EIS) for the Formal Training Unit (FTU) and Main Operating Base 1 (MOB 1) for the Beddown of KC...-46A tanker aircraft, associated infrastructure and manpower of the FTU and MOB 1 at existing active...

  15. 76 FR 30962 - Notice of Availability of Draft Environmental Impact Statement for the Sigurd to Red Butte No. 2...

    Science.gov (United States)

    2011-05-27

    ...; UTU-83067] Notice of Availability of Draft Environmental Impact Statement for the Sigurd to Red Butte..., as amended, the Bureau of Land Management (BLM) has prepared a Draft Environmental Impact Statement... Service; State of Utah; Millard, Sevier, Beaver, Iron, and Washington counties, Utah; and the cities of St...

  16. Final environmental statement related to the Plateau Resources Limited Shootering Canyon Uranium Project (Garfield County, Utah)

    International Nuclear Information System (INIS)

    1979-07-01

    The proposed action is the issuance of a Source Material License to Plateau Resources, Ltd., for the construction and operation of the proposed Shootering Canyon Uranium Project with a product (U 3 O 8 ) production limited to 2.2 x 10 5 kg (4.9 x 10 5 lb) per year. Impacts to the area from the operation of the Shootering Canyon Uranium Project will include the following: alterations of up to 140 ha (350 acres) that will be occupied by the mill, mill facilities, borrow areas, tailings areas, and roads; an increase in the existing background radiation levels of the mill area as a result of continuous but small releases of uranium, radium, radon, and other, radioactive materials during construction and operation; socioeconomic effects on the local area, particularly the proposed community of Ticaboo, where the majority of workers will be housed during project construction and operation; and production of solid waste material (tailings) from the mill at a rate of about 680 MT (750 tons) per day and deposition as a slurry in an onsite impoundment area; construction and operation of the Shootering Canyon mill will provide employment and induced economic benefits for the region but may also result in some socioeconomic stress. On the basis of the analysis and evaluation set forth in this Environmental Statement, it is proposed that any license issued for the Shootering Canyon mill should be subject to certain conditions for the protection of the environment. A list is included. Nine appendices are also included

  17. 78 FR 71026 - Environmental Impact Statement for the Lake Tahoe Passenger Ferry Project, Placer and El Dorado...

    Science.gov (United States)

    2013-11-27

    ... adequate for operations. The EIS will be prepared in accordance with the requirements of the National... land uses include Ski Run Marina Village (a collection of shops and restaurants), Tahoe Beach & Ski and... of the construction and operation of the proposed project. The probable impacts will be determined as...

  18. International Association for Hospice and Palliative Care Position Statement: Euthanasia and Physician-Assisted Suicide

    Science.gov (United States)

    Woodruff, Roger; Pettus, Katherine; Downing, Julia; Buitrago, Rosa; Munyoro, Esther; Venkateswaran, Chitra; Bhatnagar, Sushma; Radbruch, Lukas

    2017-01-01

    Abstract Background: Reports about regulations and laws on Euthanasia and Physician Assisted Suicide (PAS) are becoming increasingly common in the media. Many groups have expressed opposition to euthanasia and PAS while those in favor argue that severely chronically ill and debilitated patients have a right to control the timing and manner of their death. Others argue that both PAS and euthanasia are ethically legitimate in rare and exceptional cases. Given that these discussions as well as the new and proposed laws and regulations may have a powerful impact on patients, caregivers, and health care providers, the International Association for Hospice and Palliative Care (IAHPC) has prepared this statement. Purpose: To describe the position of the IAHPC regarding Euthanasia and PAS. Method: The IAHPC formed a working group (WG) of seven board members and two staff officers who volunteered to participate in this process. An online search was performed using the terms “position statement”, “euthanasia” “assisted suicide” “PAS” to identify existing position statements from health professional organizations. Only statements from national or pan-national associations were included. Statements from seven general medical and nursing associations and statements from seven palliative care organizations were identified. A working document including a summary of the different position statements was prepared and based on these, an initial draft was prepared. Online discussions among the members of the WG took place for a period of three months. The differences were reconciled by email discussions. The resulting draft was shared with the full board. Additional comments and suggestions were incorporated. This document represents the final version approved by the IAHPC Board of Directors. Result: IAHPC believes that no country or state should consider the legalization of euthanasia or PAS until it ensures universal access to palliative care services and to

  19. Teaching the Statement of Changes in Financial Position--A Worksheet Approach.

    Science.gov (United States)

    Byrd, David B.; Byrd, Sandra D.

    1986-01-01

    The worksheet approach to preparing a Statement of Changes in Financial Position (SCFP) is presented. An example that has been developed for presentation to the class during the first class period spent on SCFPs is discussed. Conversion of working capital to cash is also explained. (CT)

  20. Rio 2016 financial statements

    OpenAIRE

    2015-01-01

    These documents include the report from independent auditors balance sheet, the statement of income, the statement of changes in equity, the statement of cash flows and the explanatory notes to the financial statements.

  1. Automatically Preparing Safe SQL Queries

    Science.gov (United States)

    Bisht, Prithvi; Sistla, A. Prasad; Venkatakrishnan, V. N.

    We present the first sound program source transformation approach for automatically transforming the code of a legacy web application to employ PREPARE statements in place of unsafe SQL queries. Our approach therefore opens the way for eradicating the SQL injection threat vector from legacy web applications.

  2. 75 FR 19989 - Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric...

    Science.gov (United States)

    2010-04-16

    ... Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake, MT AGENCY: Bureau of Indian... Impact Statement (FEIS) for Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake... drought management planning at the Kerr Hydroelectric Project no sooner than 30 days following the...

  3. Hellsgate Winter Range: Wildlife Mitigation Project. Final Environmental Assessment

    International Nuclear Information System (INIS)

    1995-03-01

    BPA proposes to fund the Hellsgate Winter Range: Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The Project is intended to mitigate for wildlife and wildlife habitat adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs. The Project would allow the sponsors to secure land and conduct wildlife habitat improvement and long-term management activities within the boundaries of the Colville Indian Reservation. BPA has prepared an Environmental Assessment (EA) (DOE/EA-0940) evaluating the potential environmental effects of the proposed Project (Alternative B) and No Action (Alternative A). Protection and re-establishment of riparian and upland habitat on the Colville Indian Reservation, under Alternative B, would not have a significant adverse environmental impact because: (1) there would be only limited, mostly short-term adverse impacts on soils, water quality, air quality, vegetation, and wildlife (including no effect on endangered species); and (2) there would be no adverse effect on water quantity, cultural resources, or land use. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI

  4. Nuclear and radiological preparedness: the achievements of the European research project prepare

    International Nuclear Information System (INIS)

    Schneider, Thierry; Gering, Florian; Charron, Sylvie; Zhelezniak, Mark; Andronopoulos, Spyros; Heriard-Dubreuil, Gilles; Camps, Johan; Raskob, Wolfgang

    2017-01-01

    The PREPARE project aimed closing gaps identified in nuclear and radiological preparedness in Europe following the first evaluation of the Fukushima disaster. With 46 partners from Europe and Japan, it collected the key players in the area of emergency management and rehabilitation preparedness. Starting from February 2013, the project ended in January 2016. Among others, the project reviewed existing operational procedures for long-lasting releases, cross-border problems in radiation monitoring and food safety and further developed missing functionalities in decision support systems ranging from improved source term estimation and dispersion modelling to the inclusion of hydrological pathways for European water bodies. In addition, a so-called Analytical Platform has been developed to explore the scientific and operational means to improve information collection, information exchange and the evaluation of such types of disasters. The tools developed within the project will be partly integrated into the decision support systems ARGOS and JRODOS. (authors)

  5. Implications of IFRS Adoption on Balance-Sheet vs Income Statement Figures

    Directory of Open Access Journals (Sweden)

    Valentin BURCA

    2014-12-01

    Full Text Available On the last two decades, financial reporting area has suffered lot of changes in order to respond properly to the dynamics of the economic system characterized by continuous process of globalization, international capitalization, and multinational corporations increasing economic impact. Implementation of IFRSs has been positively perceived by both preparers and users from quality of financial information improvement point of view and economic effects perspective as well. Romanian regulators have decided to align to the EU accounting legislation by adopting IFRS for the consolidated accounts preparation. Furthermore, they have chosen to extend IFRS use to individual financial statements in case of all listed companies. In this study we will provide evidence using an index of conservatism that there are small changes on the financial accounts pre IFRS adoption versus post IFRS adoption at the statutory financial statements level. This evidence is actually reflecting the continuous efforts of Romanian regulator to harmonize the local accounting regulation with IFRS.

  6. 75 FR 31509 - Rescinding the Notice of Intent for an Environmental Impact Statement: Prince George's County, MD

    Science.gov (United States)

    2010-06-03

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Rescinding the Notice of Intent for an Environmental Impact Statement: Prince George's County, MD AGENCY: Federal Highway Administration. ACTION... Statement that was issued on June 11, 2008, for a proposed roadway improvement project in Prince George's...

  7. 78 FR 54873 - Notice of Intent To Prepare an Environmental Impact Statement for Multiple Projects in Support of...

    Science.gov (United States)

    2013-09-06

    ... School, 1001 G St SE., Washington, DC 20390. The public is invited to attend this meeting to view project... newspapers. Please submit requests for special assistance, sign language interpretation for the hearing...

  8. Stem cell research ethics: consensus statement on emerging issues.

    Science.gov (United States)

    Caulfield, Timothy; Ogbogu, Ubaka; Nelson, Erin; Einsiedel, Edna; Knoppers, Bartha; McDonald, Michael; Brunger, Fern; Downey, Robin; Fernando, Kanchana; Galipeau, Jacques; Geransar, Rose; Griener, Glenn; Grenier, Glenn; Hyun, Insoo; Isasi, Rosario; Kardel, Melanie; Knowles, Lori; Kucic, Terrence; Lotjonen, Salla; Lyall, Drew; Magnus, David; Mathews, Debra J H; Nisbet, Matthew; Nisker, Jeffrey; Pare, Guillaume; Pattinson, Shaun; Pullman, Daryl; Rudnicki, Michael; Williams-Jones, Bryn; Zimmerman, Susan

    2007-10-01

    This article is a consensus statement by an international interdisciplinary group of academic experts and Canadian policy-makers on emerging ethical, legal and social issues in human embryonic stem cells (hESC) research in Canada. The process of researching consensus included consultations with key stakeholders in hESC research (regulations, stem cell researchers, and research ethics experts), preparation and distribution of background papers, and an international workshop held in Montreal in February 2007 to discuss the papers and debate recommendations. The recommendations provided in the consensus statement focus on issues of immediate relevance to Canadian policy-makers, including informed consent to hESC research, the use of fresh embryos in research, management of conflicts of interest, and the relevance of public opinion research to policy-making.

  9. Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004

    International Nuclear Information System (INIS)

    1993-11-01

    This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems

  10. Proposed Columbia Wind Farm No. 1 : Draft Environmental Impact Statement, Joint NEPA/SEPA.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Klickitat County (Wash.)

    1995-03-01

    This Draft Environmental Impact Statement (DEIS) addresses the Columbia Wind Farm {number_sign}1 (Project) proposal for construction and operation of a 25 megawatt (MW) wind power project in the Columbia Hills area southeast of Goldendale in Klickitat County, Washington. The Project would be constructed on private land by Conservation and Renewable Energy System (CARES) (the Applicant). An Environmental Impact Statement is required under both NEPA and SEPA guidelines and is issued under Section 102 (2) (C) of the National Environmental Policy Act (NEPA) at 42 U.S.C. 4321 et seq and under the Washington State Environmental Policy Act (SEPA) as provided by RCW 43.21C.030 (2) (c). Bonneville Power Administration is the NEPA lead agency; Klickitat County is the nominal SEPA lead agency and CARES is the SEPA co-lead agency for this DEIS. The Project site is approximately 395 hectares (975 acres) in size. The Proposed Action would include approximately 91 model AWT-26 wind turbines. Under the No Action Alternative, the Project would not be constructed and existing grazing and agricultural activities on the site would continue.

  11. 75 FR 14593 - Environmental Impact Statements and Regulations; Availability of EPA Comments

    Science.gov (United States)

    2010-03-26

    ... Management Plan for Reef Fish Resources, Addresses Bycatch of Sea Turtles in the Bottom Longline Component of... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-8989-4] Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared pursuant to the Environmental Review Process...

  12. IMAP Statement on safeguarding reproductive rights in the face of declining fertility

    DEFF Research Database (Denmark)

    Tellier, Siri

    This Statement has been prepared by the International Medical Advisory Panel (IMAP) and was approved in November 2016. Profound changes in demographic patterns are taking place globally. Birth rates are falling in most countries around the world. Many governments are concerned about the impact of...

  13. West Valley Demonstration Project annual report to Congress

    International Nuclear Information System (INIS)

    1990-01-01

    By the end of the fiscal year, the West Valley Demonstration Project had processed 757,000 litres of liquid high-level waste, removing most of the radioactive constituents by ion exchange. The radioactive ion exchange material is being stored in an underground tank pending its incorporation, along with sludge still in the tank, into borosilicate glass. The decontaminated salt solution was solidified into a cement low-level waste form which has been reviewed and endorsed by the Nuclear Regulatory Commission. Five tests of the waste glass melter system were completed. A Notice of Intent was published to prepare a joint federal/state Environmental Impact Statement. Design of the Vitrification Facility, a major milestone, was completed and construction of the facility enclosure has begun. A Department of Energy Tiger Team and Technical Safety Appraisal of the Project found no undue risks to worker or public health and safety or the environment

  14. Statement of Accountability Reconciliation Procedures for Defense Finance and Accounting Service Columbus Center, Disbursing Station 6551

    National Research Council Canada - National Science Library

    1998-01-01

    .... Beginning in FY 1996, the Defense Finance and Accounting Service (DFAS) Indianapolis Center became responsible for preparing the financial statements for the Department 97 general fund appropriations...

  15. Factors influencing Complexity in Financial Report preparation - Evidence from the Banking Sector in Kenya

    Directory of Open Access Journals (Sweden)

    A.Mutiso

    2013-06-01

    Full Text Available The current developments in the business environment as well as in the accountancy profession have significantly affected the way the financial reports are prepared. This study sought to assess the factors influencing complexity of preparing financial reports in the banking sector in Kenya. The objectives included assessing whether disclosures, adoption of International financial Reporting Standard, regulations and lack of competence by the preparers have contributed to the complexity of preparing financial statements. Using a descriptive study design, data was collected from ten banks registered in the Nairobi Capital Market. The study found out that the identified variables positively contributed to complications in the preparation of financial reports. Management interference, lack of guidance on interpretations and frequent updates of the standards were identified as the main challenges in preparing financial reports. Several recommendations were given to help simplify the process of preparing financial statements.

  16. The 7 Aarhus Statements on Climate Change

    Science.gov (United States)

    Margrethe Basse, Ellen; Svenning, Jens-Christian; Olesen, Jørgen E.; Besenbacher, Flemming; Læssøe, Jeppe; Seidenkrantz, Marit-Solveig; Lange, Lene

    2009-03-01

    More than 1000 prominent representatives from science, industry, politics and NGOs were gathered in Aarhus on 5-7 March 2009 for the international climate conference 'Beyond Kyoto: Addressing the Challenges of Climate Change'. Thematically, Beyond Kyoto was divided into seven areas of particular interest for understanding the effects of the projected future climate change and how the foreseen negative impacts can be counteracted by mitigation and adaptation measures. The themes were: Climate policy: the role of law and economics; Biodiversity and ecosystems; Agriculture and climate change; Nanotechnology solutions for a sustainable future; Citizens and society, and The Arctic. The main responsible scientists for the seven conference themes and representatives from the think-tank CONCITO delivered 'The 7 Aarhus Statements on Climate Change' as part of the closing session of the conference. The statements were also communicated to the Danish Government as well as to the press. This article is the product of the collective subsequent work of the seven theme responsibles and is a presentation of each theme statement in detail, emphasizing the current state of knowledge and how it may be used to minimize the expected negative impacts of future climate change.

  17. 76 FR 64941 - Notice of Cancellation of Environmental Impact Statement for the Proposed Hyde County Wind Energy...

    Science.gov (United States)

    2011-10-19

    ... Environmental Impact Statement for the Proposed Hyde County Wind Energy Center Project, Hyde County, SD AGENCY... design, construct, operate, and maintain a 150-megawatt Hyde County Wind Energy Center Project (Project... terminated the NEPA process for NextEra's proposed Hyde County Wind Energy Center Project with the...

  18. Report: Fiscal 2004 and 2003 Financial Statements for the Pesticides Reregistration and Expedited Processing Fund

    Science.gov (United States)

    Report #2005-1-00081, May 4, 2005. We identified the following reportable conditions: We could not assess the adequacy of automated controls. EPA needs to improve financial statement preparation and quality control.

  19. Environmental impact statement requirements for CNEA

    International Nuclear Information System (INIS)

    Ciurciolo, Melisa N.; Mender, J. A.

    2009-01-01

    The purpose of this paper is to describe the legal framework on Environmental Impact Assessment (EIA) regarding the activities of the National Atomic Energy Commission (Comision Nacional de Energia Atomica, CNEA), and particularly, the Procedure for Internal Management of Environmental Impact Statements of CNEA (PN-PR-027). According to the distribution of powers stated in article 41 of the National Constitution, the environmental legal framework is constituted by National minimum standards for environmental protection and complementary provincial and municipal regulations. As a result, the EIA legal framework is not uniform across the Nation, and therefore, it differs according to the jurisdiction in which the activity subject to EIA is developed. Notwithstanding, the General Statute of the Environment (25.675) requires EIA for any project or activity developed in the National territory, which may cause a significant degradation to the environment, any of its components, or affect the populations' quality of life in a significant way. Since CNEA develops activities along the National territory, it is not possible to determine a uniform legal EIA framework for the entire Institution. Consequently, the binding requirements for Environmental Impact Statements (EISs) of CNEA activities differ among the activities developed in the different locations and atomic centers. In order to achieve a uniform environmental performance in CNEA, it has been considered necessary to uniform, in the internal sphere, the binding requirements for EIS, by means of a procedure written within the framework of the Environmental Management System of the Institution. The purpose of the Procedure for Internal Management of Environmental Impact Statements is to determine the requirements to be complied by the atomic centers, locations and enterprises associated with CNEA, regarding EIS Management. This Procedure shall apply to those projects and activities subjected to EIA, according to a

  20. 77 FR 20094 - Intent To Prepare an Environmental Impact Statement on the Durham-Orange Light Rail (LRT) Project...

    Science.gov (United States)

    2012-04-03

    ... congested conditions. Need to serve population with high propensity for transit use: University students and... transit passes, will support increased mobility options for university students, employees and other... increased travel demand. By 2035, the corridor is projected to add about 74,000 people and 81,000 jobs...

  1. PARTICULARITIES REGARDING THE REFLECTION OF FOREIGN CURRENCY TRANSACTIONS IN FINANCIAL STATEMENTS

    Directory of Open Access Journals (Sweden)

    Ionela Cristina Breahna Pravat

    2014-07-01

    Full Text Available The structure and the constituent parts of financial statements are regulated at a national level, mainly by Accounting regulations compliant with European Directives ̶ O.M.P.F. no. 3055/2009, but also by Accounting regulations compliant with International Financial Reporting Standards applied by the trading companies whose securities are rated on a regulated capital market ̶ O.M.P.F. no. 1286/2012. From this latter point of view, an important role is played by IAS 1 “Presentation of Financial Statements”, respectively IAS 21 “The Effects of Changes in Foreign Exchange Rates”. Therefore, this study aims to describe a series of theoretical and practical aspects regarding the particularities of presenting elements generated by foreign currency transactions in financial statements, which are prepared in compliance with the Romanian accounting regulations ̶ balance sheet, profit and loss account, cash flow statement, statement of changes in equity, explanatory notes. The paper also approaches the effect of changes in foreign exchange rates, respectively the accounting recognition of exchange differences, which are specific to different foreign currency operations, according to national regulations (and implicitly, to European Directives, but also according to international regulations (IFRS.

  2. 76 FR 70169 - Draft Supplement 2 to Final Environmental Statement Related to the Operation of Watts Bar Nuclear...

    Science.gov (United States)

    2011-11-10

    ... Environmental Statement Related to the Operation of Watts Bar Nuclear Plant, Unit 2; Tennessee Valley Authority... on NUREG-0498, ``Final Environmental Statement, Supplement 2, Related to the Operation of Watts Bar... the Nuclear Regulatory Commission. Stephen J. Campbell, Chief, Watts Bar Special Projects Branch...

  3. Accounting Entries Made in Compiling the FY 2000 Air Force General Funds Financial Statements

    National Research Council Canada - National Science Library

    2001-01-01

    ... to the Office of Management and Budget. This audit is one in a series of audits of accounting entries made by the Defense Finance and Accounting Service in preparing the FY 2000 financial statements for DoD...

  4. HAL/S programmer's guide. [for space shuttle project

    Science.gov (United States)

    Newbold, P. M.; Hotz, R. L.

    1974-01-01

    The structure and symbology of the HAL/S programming language are described; this language is to be used among the flight software for the space shuttle project. The data declaration, input/output statements, and replace statements are also discussed.

  5. Highland Uranium Solution Mining Project. Draft environmental statement

    International Nuclear Information System (INIS)

    1978-05-01

    Exxon Minerals Co. proposes to conduct production-scale solution mining (in situ leaching) of uranium within the existing Highland Operation area in Converse County, Wyoming. The project would result in the temporary removal of 200 acres from grazing and the actual disturbance of 50 acres. About 4500 acre-ft of water will be withdrawn from the ore zone aquifer over the 10-year life of the project. There will be no discharge of liquid effluents from the project; atmospheric effluents will be within acceptable limits. Radiation doses at the nearest ranch resulting from solution mining activities were estimated. The project proposes the production and utilization of 1 to 3 million lb of uranium resources. It will not produce any significant socioeconomic impact on the local area. Alternatives to the project were considered, and conditions for issuing the source material license are listed

  6. Financial Statements Analysis

    OpenAIRE

    Tănase Alin-Eliodor

    2014-01-01

    This article focuses on analyzing of a consolidated financial statements of a hypothetically SME. The interpretation of the financial position and performances is based on the more than 40 financial key ratios computed by using financial data from consolidated income statement, consolidated financial position and cash flow. However additional data from notes to financial statements are provided.

  7. 78 FR 4377 - Idaho Panhandle National Forests, Coeur d'Alene River Ranger District, Shoshone County, ID...

    Science.gov (United States)

    2013-01-22

    ... Ranger District, Shoshone County, ID; Beaver Creek Project AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an environmental impact statement. SUMMARY: The Forest Service will prepare an Environmental Impact Statement (EIS) on a proposal to accomplish vegetation management in the Beaver Creek...

  8. Griffith energy project draft environmental impact statement

    International Nuclear Information System (INIS)

    1998-10-01

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fired, combined cycle power plant, on private lands south of Kingman, Arizona. The Project would be a merchant plant which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. The existing environmental resource conditions in the Project area and the potential impacts on the resources by the proposed action and alternatives are described. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management

  9. Measuring the quality of clinical audit projects.

    Science.gov (United States)

    Millard, A D

    2000-11-01

    The aim of the study was to develop and pilot a scale measuring the quality of audit projects through audit project reports. Statements about clinical audit projects were selected from existing instruments assessing the quality of clinical audit projects to form a Likert scale. Audit facilitators based in Scottish health boards and trusts piloted the scale. The participants were known to have over 2 years of experience of supporting clinical audit. The response at first test was 11 of 14 and at the second test 27 of 46. Audit facilitators tested the draft scale by expressing their strength of agreement or disagreement with each statement for three reports. Validity and reliability were assessed by test - re-test, item - total, and total - global indicator correlation. Of the 20 statements, 15 had satisfactory correlation with scale totals. Scale totals had good correlation with global indicators. Test re-test correlation was modest. The wide range of responses means further research is needed to measure the consistency of audit facilitators' interpretations, perhaps comparing a trained group with an untrained group. There may be a need for a separate scale for reaudits. Educational impact is distinct from project impact generally. It may be more meaningful to treat the selection of projects and aims, methodology and impact separately as subscales and take a project profiling approach rather than attempting to produce a global quality index.

  10. The creation of science projects in the physics teachers preparation

    Science.gov (United States)

    Horváthová, Daniela; Rakovská, Mária; Zelenický, Ľubomír

    2017-01-01

    Terms - project, projecting and the method of projecting - are nowadays frequently used in different relations. Those terms, especially as methods (of a cognitive process), are also transferred to the educational process. Before a new educational method comes to practice, the teacher should be familiar with it and preferably when it is done so during his university studies. An optional subject called Physics in a system of science subjects has been included into physics curricula for students of the fourth year of their studies at the Faculty of Science of Constantine the Philosopher University in Nitra. Its task is to make students aware of ways how to coordinate knowledge and instructions presented in these subjects through analysis of curricula and textbooks. As a part of their seminars students are asked to create integrated tasks and experiments which can be assessed from the point of view of either physics or chemistry or biology and which can motivate pupils and form their complex view on various phenomena in the nature. Therefore the article discusses theoretical and also practical questions related to experience that originates from placing the mentioned method and the subject Physics in a system of science subjects into the preparation of a natural sciences teacher in our workplace.

  11. Back to Basics: Algebraic Foundations of the Statement of Cash Flows

    Science.gov (United States)

    Joyner, Donald T.; Banatte, Jean-Marie; Dondeti, V. Reddy

    2014-01-01

    The indirect method for preparing the statement of cash flows, as described in many standard textbooks, involves an item-by-item approach, telling you to add to or subtract from the net income, the increases or decreases in the balance sheet items, such as accounts payable or accounts receivable. Many business students, especially at the…

  12. Preparing the Production of a New Product in Small and Medium-Sized Enterprises by Using the Method of Projects Management

    Science.gov (United States)

    Bijańska, Jolanta; Wodarski, Krzysztof; Wójcik, Janusz

    2016-06-01

    Efficient and effective preparation the production of new products is important requirement for a functioning and development of small and medium-sized enterprises. One of the methods, which support the fulfilment of this condition is project management. This publication presents the results of considerations, which are aimed at developing a project management model of preparation the production of a new product, adopted to specificity of small and medium-sized enterprises.

  13. Hanford Remedial Action Environmental Impact Statement, Richland, Washington. Implementation Plan

    International Nuclear Information System (INIS)

    1995-06-01

    This implementation plan was prepared in compliance in compliance with 10 CFR 1021. It includes the following sections: introduction; purpose and need for departmental action; scope, content, and alternatives for the HRA EIS; public participation process; schedule for preparation of the HRA EIS; anticipated environmental reviews and consultations; and contractor disclosure statement. The following appendices are also included: notice of intent, federal register notice for extension of public scoping period, proposed annotated outline for the draft HRA EIS, summary of final report for the Hanford Future Site Uses Working Group, and summary of comments and responses from the public scoping process

  14. Proposed Columbia Wind Farm number-sign 1. Joint NEPA/SEPA draft environmental impact statement

    International Nuclear Information System (INIS)

    1995-03-01

    This Draft Environmental Impact Statement (DEIS) addresses the Columbia Wind Farm number-sign 1 (Project) proposal for construction and operation of a 25 megawatt (MW) wind power project in the Columbia Hills area southeast of Goldendale in Klickitat County, Washington. The Project would be constructed on private land by Conservation and Renewable Energy System (CARES) (the Applicant). An Environmental Impact Statement is required under both NEPA and SEPA guidelines and is issued under Section 102 (2) (C) of the National Environmental Policy Act (NEPA) at 42 U.S.C. 4321 et seq and under the Washington State Environmental Policy Act (SEPA) as provided by RCW 43.21C.030 (2) (c). Bonneville Power Administration is the NEPA lead agency; Klickitat County is the nominal SEPA lead agency and CARES is the SEPA co-lead agency for this DEIS. The Project site is approximately 395 hectares (975 acres) in size. The Proposed Action would include approximately 91 model AWT-26 wind turbines. Under the No Action Alternative, the Project would not be constructed and existing grazing and agricultural activities on the site would continue

  15. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume I

    Energy Technology Data Exchange (ETDEWEB)

    None

    1996-10-01

    This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings " ... may pose a potential and significant radiation health hazard to the public, and that every reasonable effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings." Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project are

  16. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume I

    International Nuclear Information System (INIS)

    1996-01-01

    This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings ' ... may pose a potential and significant radiation health hazard to the public, and that every reasonable effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings.' Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project are in

  17. Financial Statements in Providing Financial Security of Agricultural Enterprises

    OpenAIRE

    Olha Vdovenko

    2014-01-01

    In conditions of severe market competition and economic turmoil financial security of agricultural businesses largely depends on the effectiveness of management decisions, reporting being the information support to ensure such decision making. Thus, the practice of preparing accounting figures and their adjustment has a direct effect on agricultural businesses financial security. Having been generalized at the industry level, statistical and financial statements are used for the development o...

  18. 75 FR 13305 - Notice of Cancellation of the Environmental Impact Statement for the Criminal Alien Requirement 9

    Science.gov (United States)

    2010-03-19

    ... Statement for the Criminal Alien Requirement 9 AGENCY: U.S. Department of Justice, Federal Bureau of Prisons... Environmental Impact Statement (EIS) for the Criminal Alien Requirement 9 project (CAR 9). This notice briefly... contractor's to house up to 1,889 federal, low-security, adult male, non-U.S. citizen, criminal aliens at...

  19. Final programmatic environmental impact statement related to decontamination and disposal of radioactive wastes resulting from March 28, 1979 accident, Three Mile Island Nuclear Station, Unit 2, Docket No. 50-320

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-03-01

    A Final Programmatic Environmental Impact Statement (PEIS) related to the decontamination and disposal of radioactive wastes resulting from the March 28, 1979, accident at Three Mile Island Nuclear Station, Unit 2 (Docket No. 50-320) has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission in response to a directive issued by the Commission on November 21, 1979. This statement is an overall study of the activities necessary for decontamination of the facility, defueling, and disposition of the radioactive wastes. The available alternatives considered ranged from implementation of full cleanup to no action other than continuing to maintain the reactor in a safe shutdown condition. Also included are comments of governmental agencies, other organizations, and the general public on the Draft PEIS on this project, and staff responses to these comments. (author)

  20. Bear Creek Project. Draft environmental statement

    International Nuclear Information System (INIS)

    1977-01-01

    The Bear Creek Project consists of mining and milling operations involving uranium ore deposits located in Converse County, Wyoming. Mining of uranium from six known ore bodies will take place over ten years; a 1000 tons ore/day will be constructed and operated as long as ore is available. The tailings will be stored onsite in an impoundment. The project would convert 2700 acres from grazing use to mining/milling activities for about ten years. Mining would disturb a total of 1600 acres but, because of reclamation, the max acreage disturbed at any one time would be about 1000 acres, the average being about 650 acres. Dose rates were computed for an individual in a ranch house at the nearest ranch. Conditions for the protection of the environment are proposed. Possible environmental impacts evaluated cover air, land, water, soil, vegetation, wildlife, and community. A benefit-cost analysis is made

  1. GASB 35 Implementation Guide: Questions and Answers for Public Colleges and Universities Using Business Type Activity (BTA) Reporting. A Supplement to GASB's Implementation Guide for Statement 34

    Science.gov (United States)

    National Association of College and University Business Officers (NJ1), 2001

    2001-01-01

    This guide was prepared for public institution business officers as a supplement to the "Guide to Implementation of GASB Statement 54 on Basic Financial Statements--and Management's Discussion and Analysis--for State and Local Governments, published in April 2000 by the Governmental Accounting Standards Board (GASB) on GASB Statements 34 and 35.…

  2. Mid-Columbia Coho Reintroduction Feasibility Project : Final Environmental Assessment and Finding of No Significant Impact.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Confederated Tribes and Bands of the Yakama Nation; Washington State Department of Fish and Wildlife

    1999-04-01

    Bonneville Power Administration (BPA) is proposing to fund research for 2 to 3 years on the feasibility of reintroducing coho salmon into mid-Columbia River basin tributaries. The research would take place in the Methow and Wenatchee river basins in Chelan and Okanogan Counties, Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1282) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact.

  3. Mid-Columbia Coho Reintroduction Feasibility Project. Final Environmental Assessment and Finding of No Significant Impact

    International Nuclear Information System (INIS)

    1999-01-01

    Bonneville Power Administration (BPA) is proposing to fund research for 2 to 3 years on the feasibility of reintroducing coho salmon into mid-Columbia River basin tributaries. The research would take place in the Methow and Wenatchee river basins in Chelan and Okanogan Counties, Washington. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1282) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact

  4. 36 CFR 907.8 - Actions that normally require an EIS.

    Science.gov (United States)

    2010-07-01

    ... and carbon monoxide; (4) Solid waste disposal generated by a project of the Corporation or of a... performed an environmental assessment to determine if a proposal requires an environmental impact statement... prepare or have prepared the environmental impact statement. To assist in determining if a proposal or...

  5. 7 CFR 2903.6 - Project types.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Project types. 2903.6 Section 2903.6 Agriculture... AGRICULTURE BIODIESEL FUEL EDUCATION PROGRAM Program Description § 2903.6 Project types. OEPNU intends to... predetermined project period with a statement of intention to provide additional support at a future date...

  6. Employment, Preparation and Management of Paraeducators: Challenges to Appropriate Service for Students with Developmental Disabilities.

    Science.gov (United States)

    Hilton, Alan; Gerlach, Kent

    1997-01-01

    Presents a position statement of the Board of Directors of the Division on Mental Retardation and Developmental Disabilities that reviews the employment, preparation, and management of paraeducators. The statement addresses role definition, employment and management, legal and ethical responsibilities, job descriptions, paraeducator training, and…

  7. Value Relevance of Consolidated Versus Parent Company Financial Statements: Evidence from the Largest Three European Capital Markets

    OpenAIRE

    Victor-Octavian MULLER

    2011-01-01

    Within the European Union, parent companies have to prepare and publish both consolidated and individual financial statements. The objective of financial statements with general purpose is to give information regarding the financial position, performance and changes in financial position of the reporting entity, information that is useful to investors and other users in making economic decisions. In order to be useful, financial information needs to be relevant to the decision-making process ...

  8. Resource programs: Draft Environmental Impact Statement Resource Programs

    International Nuclear Information System (INIS)

    1992-03-01

    Every two years, Bonneville Power Administration (BPA) prepares a Resource Program which identifies the resource actions BPA will take to meet its obligation to serve the forecasted power requirements of its customers. The Resource Program's Environmental Impact Statement (RPEIS) is a programmatic environmental document which will support decisions made in several future Resource Programs. Environmental documents tiered to the EIS may be prepared on a site-specific basis. The RPEIS includes a description of the environmental effects and mitigation for the various resource types available in order to evaluate the trade-offs among them. It also assesses the environmental impacts of adding thirteen alternative combinations of resources to the existing power system. This report contains the appendices to the RPEIS

  9. Standard-Setters Versus Big4 Opinion, Concerning Iasb Revision Project of the Conceptual Framework for Financial Reporting. the Case of Presentation and Disclosures Chapter

    Directory of Open Access Journals (Sweden)

    Burca Valentin

    2015-07-01

    Full Text Available On the last decades the accounting system haven‘t been able to follow the dynamics of the economic systems generated by the globalization process. In order to reduce the lag between the demand of financial information and the offer of financial information, IASB has started numerous initiatives aiming the increase on the quality of the financial information. Among the current list of current IASB major projects there is also the project of revising the actual conceptual framework for financial reporting. This study is designed to give some directions that will be considered on the exposure draft of this project, analyzing the comment letters submitted by the members of ASAF and the Big4 as well. The study reveals the increasing importance the preparers and users give to the disclosures included on the notes to the primary financial statements. Moreover, on this study we emphasize several challenges that IASB has to face on issuing the exposure draft for this important project. Some of the main challenges refer to the narrow scope of the financial statements, the criteria used on classification, aggregation and offsetting, or the use of the materiality concept

  10. The concept of the materiality in the financial statement auditing

    OpenAIRE

    Raziūnienė, Daiva; Verbickaitė, Gintarė

    2017-01-01

    The financial auditors are required to provide the assurance for the public whether the financial statements are prepared, in all material respects, in accordance with the applicable financial reporting framework. The International Federation of Accountants, the International Auditing and Assurance Standards Board formulated general guidelines and principles of audit materiality assessments and provided that in auditing standards (IAA 320 and IAA 450). Financial auditors have independently to...

  11. BPA/Puget Power Northwest Washington Transmission Project Final Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-08-01

    Bonneville Power Administration (BPA) and Puget Sound Power & Light Company (Puget Power) propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit counties area between the towns of Custer and Sedro Woolley, including some areas within the City of Bellingham, starting in 1995. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993, followed by a 45-day public comment period. Public response to the DEIS included the identification of several new transmission route alternatives in the Lake Whatcom area. BPA issued a Supplemental DEIS in April 1995 to provide a second public review-and-comment period. Rebuilding an existing 230-kV line to a double-circuit 230-kV transmission line was identified in the Supplemental DEIS as the Proposed Action. The Supplemental DEIS also examined in detail a North Shore Road alternative which was proposed by some members of the public. Public comments on the EIS were listed and responded to in the Supplemental DEIS. In May 1995, a second set of open houses and public meetings was held to review the Supplemental DEIS. Electromagnetic field (EMF) effects raised as an issue in the DEIS continued to be an issue of public concern in the meetings. The EIS has identified impacts that would generally be classified as low to moderate and localized. Effects on soils and water resources in sensitive areas (e.g., near Lake Whatcom) would be low to moderate; there would be little change in magnetic fields; noise levels would remain at existing levels; and land use and property value impacts would be minimal. Threatened and endangered species would not be adversely affected, and all proposed actions in wetlands would be covered by a Corps of Engineers Nationwide Permit. Visual and socioeconomic would be low to moderate. There would be no effect on cultural resources.

  12. 75 FR 49504 - Notice of Availability of Final Environmental Impact Statement for the Goethals Bridge...

    Science.gov (United States)

    2010-08-13

    ... Final Environmental Impact Statement for the Goethals Bridge Replacement Project AGENCY: Coast Guard... the 82-year old Goethals Bridge across the Arthur Kill between Staten Island, NY, and Elizabeth, NJ... proposed Goethals Bridge Replacement Project. DATES: The review period for the FEIS will close on September...

  13. 77 FR 70486 - Supplemental Environmental Impact Statement for Proposed Dewey-Burdock In-Situ Uranium Recovery...

    Science.gov (United States)

    2012-11-26

    ... Proposed Dewey- Burdock In-Situ Uranium Recovery Project in Custer and Fall River Counties, SD AGENCY... draft Supplemental Environmental Impact Statement (Draft SEIS) for the Dewey-Burdock In-Situ Uranium... NRC for a new source materials license for the Dewey-Burdock ISR Project. Powertech is proposing to...

  14. Preliminary Study on the Revision of Nuclear Safety Policy Statement

    International Nuclear Information System (INIS)

    Lee, Y. E.; Lee, S. H.; Chang, H. S.; Choi, K. S.; Jung, S. J.

    2011-01-01

    Nuclear safety policy in Korea is currently declared in the Nuclear Safety Charter as the highest tier document and safety principles and directions are announced in the Nuclear Safety Policy Statement. As the circumstances affecting on the nuclear safety policy change, it needs to revise the Statement. This study aims to develop the revised Nuclear Safety Policy Statement to declare that securing safety is a prerequisite to the utilization of nuclear energy, and that all workers in nuclear industry and regulatory body must adhere to the principle of priority to safety. As a result, two different types of revision are being prepared as of August. One is based on the spirit of Nuclear Safety Charter as well as the direction of future-oriented safety policies including the changes in the environment after declaration of the Statement. The other is to declare the fundamental safety objective and safety principles as the top philosophy of national nuclear safety policy by adopting the '10 Safety Principles in IAEA Safety Fundamental' instead of the current Charter. Both versions of revision are subject to further in-depth discussion. However once the revision is finalized and declared, it would be useful to accomplish effectively the organizational responsibilities and to enhance the public confidence in nuclear safety by performing the regulatory activities in a planned and systematic manner and promulgating the government's dedication to priority to safety

  15. AAE and AAOMR Joint Position Statement: Use of Cone Beam Computed Tomography in Endodontics 2015 Update.

    Science.gov (United States)

    2015-10-01

    The following statement was prepared by the Special Committee to Revise the Joint American Association of Endodontists/American Academy of Oral and Maxillofacial Radiology Position on Cone Beam Computed Tomography, and approved by the AAE Board of Directors and AAOMR Executive Council in May 2015. AAE members may reprint this position statement for distribution to patients or referring dentists. Copyright © 2015 American Academy of Oral and Maxillofacial Radiology and American Association of Endodontists. Published by Elsevier Inc. All rights reserved.

  16. McCullough to Liberty fiber optics project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    The US Department of Energy, Western Area Power Administration (Western) proposes to replace an existing overhead static wire with a shield wire that contains optical fibers (OPGW) on transmission lines from McCullough Substation, south of Las Vegas, Nevada, to Liberty Substation near Phoenix, Arizona. The replacement will occur on the McCullough-Davis, Davis-Parker No. 2, and Parker-Liberty No. 1 230-kV transmission lines. Western is responsible for the operation and maintenance of the lines. Western prepared an Environmental Assessment (EA) entitled ``McCullough to Liberty Fiber Optics Project`` (DOE/EA-1202). The EA contains the analysis of the proposed construction, operation, and maintenance of the OPGW. Based on the analysis in the EA, Western finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. The preparation of an environmental impact statement (EIS) is not required, and therefore, Western is issuing this Findings of No Significant Impact (FONSI).

  17. McCullough to Liberty fiber optics project

    International Nuclear Information System (INIS)

    1997-05-01

    The US Department of Energy, Western Area Power Administration (Western) proposes to replace an existing overhead static wire with a shield wire that contains optical fibers (OPGW) on transmission lines from McCullough Substation, south of Las Vegas, Nevada, to Liberty Substation near Phoenix, Arizona. The replacement will occur on the McCullough-Davis, Davis-Parker No. 2, and Parker-Liberty No. 1 230-kV transmission lines. Western is responsible for the operation and maintenance of the lines. Western prepared an Environmental Assessment (EA) entitled ''McCullough to Liberty Fiber Optics Project'' (DOE/EA-1202). The EA contains the analysis of the proposed construction, operation, and maintenance of the OPGW. Based on the analysis in the EA, Western finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. The preparation of an environmental impact statement (EIS) is not required, and therefore, Western is issuing this Findings of No Significant Impact (FONSI)

  18. 78 FR 40496 - Notice of availability of the Final Environmental Impact Statement for the Proposed Hollister...

    Science.gov (United States)

    2013-07-05

    ... exploration. The proposed project would augment the existing mine water management facilities that include water treatment facilities and rapid infiltration basins by adding underground dewatering wells and by... Statement for the Proposed Hollister Underground Mine Project, Elko County, NV AGENCY: Bureau of Land...

  19. Uranium milling: Volume 1, Summary and text: Generic environmental impact statement: Draft

    International Nuclear Information System (INIS)

    1979-04-01

    This generic environmental impact statement on uranium milling has been prepared in accordance with a notice of intent published by the Nuclear Regulatory Commission (NRC). The purpose of the statement is to assess the potential environmental impacts of uranium milling operations, in a programmatic context, including the management of uranium mill tailings, and to provide an opportunity for public participation in decisions on any proposed changes in NRC regulations based on this assessment. The principal objectives of the statement are to assess the nature and extent of the environmental impacts of uranium milling in the United states from local, regional, and national perspectives on both short- and long-term bases, to determine what regulatory actions are needed; to provide information on which to determine what regulatory requirements for management and disposal of mill tailings and mill decommissioning should be; and to support any rule makings that may be determined to be necessary. 39 figs., 130 tabs

  20. ANDRA - Management report and financial statements 2011

    International Nuclear Information System (INIS)

    2012-07-01

    The first part of this ANDRA report (French National Agency for radioactive waste management) comments the global financial balance and the evolution of the personnel. It briefly presents the CIGEO project, the FA-VL project (low activity and long life). It presents the various industrial activities such as surface storage centres, nuclear activities outside the electronuclear sector (waste collection, polluted sites, national inventory of radioactive wastes). It evokes public subsidies, investments, and the international activity. It discusses the securing of the future nuclear burden financing. It briefly indicates the main objectives for 2012. The second part contains the different tables of the financial statements. These accounts are discussed and commented in appendix

  1. 77 FR 3326 - Cancellation of Environmental Impact Statement in Orange County, NC

    Science.gov (United States)

    2012-01-23

    ... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Cancellation of Environmental Impact Statement in Orange County, NC AGENCY: Federal Highway Administration (FHWA), North Carolina Department of... US 70 Business and US 70 Bypass in Orange County, North Carolina. The project is now cancelled...

  2. SWEIS Yearbook-2012 Comparison of 2012 Data to Projections of the 2008 Site-Wide Environmental Impact Statement for Continued Operation of Los Alamos National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Mahowald, Hallie B. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Wright, Marjorie Alys [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-01-16

    Los Alamos National Laboratory (LANL or the Laboratory) operations data for Calendar Year (CY) 2012 mostly fell within the 2008 Site-Wide Environmental Impact Statement (SWEIS) projections. Operation levels for one LANL facility exceeded the 2008 SWEIS capability projections—Radiochemistry Facility; however, none of the capability increases caused exceedances in radioactive air emissions, waste generation, or National Pollutant Discharge Elimination System (NPDES) discharge. Several facilities exceeded the2008 SWEIS levels for waste generation quantities; however, all were one-time, non-routine events that do not reflect the day-to-day operations of the Laboratory. In addition, total site-wide waste generation quantities were below SWEIS projections for all waste types, reflecting the overall levels of operations at both the Key and Non-Key Facilities. Although gas and electricity consumption have remained within the 2008 SWEIS limits for utilities, water consumption exceeded the 2008 SWEIS projections by 27 million gallons in CY 2012.

  3. 76 FR 70125 - Notice of Availability of the Draft Environmental Impact Statement for the Proposed Solar Reserve...

    Science.gov (United States)

    2011-11-10

    ... Environmental Impact Statement for the Proposed Solar Reserve LLC Quartzsite Solar Energy Project, La Paz County... (DEIS) for the proposed Quartzsite Solar Energy Project (Project), in La Paz County, Arizona, and the... http://www.blm.gov/az/st/en/prog/energy/solar/quartzsite_solar_energy.html . Copies of the document are...

  4. Resource Programs: Final Environmental Impact Statement

    International Nuclear Information System (INIS)

    1993-02-01

    Every two years, BA prepares a Resource Program, which identifies the resource actions BA will take to meet its obligation to serve the forecasted power requirements of its customers. The Resource Programs Environmental Impact Statement (RPEIS) is a programmatic environmental document that will support decisions made in several future Resource Programs. Environmental documents tiered to this EIS may be prepared on a site-specific basis. The RPEIS includes a description of the environmental effects and mitigation for the various resource types available in order to evaluate the trade-offs among them. It also assesses the environmental impacts of adding thirteen alternative combinations of resources to the existing power system. The alternatives represent the range of actions BA could take to meet its load obligations. Each of the alternatives allows BA to meet the almost 5,000 average megawatt load increase that could occur with high load growth, or an equivalent need for resources caused by a combination of load growth and any future loss of resources

  5. Planning for quality stewardship: The sitewide environmental impact statement

    International Nuclear Information System (INIS)

    Webb, D.

    1995-01-01

    The U.S Department of Energy is responsible for managing many large tracts of Federal land throughout this country. These sites host the nation's nuclear weapons complex, national laboratories, environmental restoration facilities, and serve other uses. The Department faces unique problems in administering this land. Many have multiple activities taking place at the same time; for example, a site may simultaneously be used for energy research, technology development, waste disposal and wildlife habitat. The sites often use radioactive and other hazardous materials and many are contaminated as a result of past management practices. In 1992 the Department institutes a policy, as stated in its National Environmental Policy Act regulations [10 CFR 1021], to prepare sitewide environmental impact statements for its large, multipurpose sites. For the first time, through the sitewide environmental impact statement process, the Department has an effective tool to plan for quality stewardship of the lands and resources entrusted to its care. The sitewide environmental impact statement is a specialized type of programmatic environmental impact statement which allows the Department to look at the geographically connected actions taking place at a given site. The sitewide statement allows a comprehensive look at the operational baseline for the entire site to determine the total cumulative impact of ongoing operations at the site. The Department can identify areas where a change in management practices would mitigate undesirable impacts; areas not at issue could continue under existing practices. As a result, an environmentally-sound operating envelope can be established. This, in turn, can serve in the future as a threshold to decide if new proposals would result in significant impacts to the site as a whole, to simplify future National Environmental Policy Act reviews

  6. Defense Finance and Accounting Service Work on the FY 1993 Air Force Defense Business Operations Fund Financial Statements

    National Research Council Canada - National Science Library

    Rau, Russell

    1995-01-01

    Our original audit objective was to determine whether the Air Force Consolidated Defense Business Operations Fund financial statements, prepared by the DFAS Denver Center for FY 1993, were presented...

  7. 77 FR 60139 - Draft Environmental Impact Statement for the Proposed Pueblo of Jemez 70.277-Acre Fee-to-Trust...

    Science.gov (United States)

    2012-10-02

    ... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Draft Environmental Impact Statement for the... all work on an Environmental Impact Statement (EIS) for the BIA Federal action of approving a 70.277 acre fee-to-trust transfer and casino project located within Do[ntilde]a Ana County, New Mexico. DATES...

  8. Griffith energy project final environmental impact statement

    International Nuclear Information System (INIS)

    1999-03-01

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fired, combined cycle power plant, on private lands south of Kingman, Arizona. The Project would be a merchant plant which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information

  9. Griffith Energy Project Final Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-04-02

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.

  10. The potential to reduce the risk of manipulation of financial statements using the identification models of creative accounting

    Directory of Open Access Journals (Sweden)

    Zita Drábková

    2013-01-01

    Full Text Available Explanatory power of accounting information is the key question for deciding of users of financial statements. A whole range of economic indicators is available to the users of financial statements to measure the firm productivity. When the accounting statements (and applied methods are manipulated, the economic indicators may reveal clearly different results. The users of financial statements should have the possibility to assess the risk of manipulation of accounting statements in time considering potential risk of accounting fraud. The aim of this paper was based on the synthesis of knowledge from the review of literature, the CFEBT model analysis and Beneish Model proposing a convenient model for identifying risks of manipulation of financial statements. The paper summarizes the outcomes of possibilities and limits of manipulated financial statements and their identification. The testing hypothesis is assessing whether there is a close relation of a loss and an increase in the cash flow in 3–5 years time; whether the sum of the amounts for 3–5 year’s time would reveal the same results respectively. The hypothesis was verified on the accounting statements of the accounting entities of prepared case studies respecting the true and fair view of accounting based on Czech accounting standards.

  11. User-Oriented Project Accounting System.

    Science.gov (United States)

    Hess, Larry G.; Alcorn, Lisa S.

    1990-01-01

    The project accounting system used by the University of Illinois Urbana-Champaign School of Chemical Sciences exchanges financial data with the campus' central accounting system and allows integration of this information with user-entered data to produce an easily read, fully obligated project accounting statement for the budget and period…

  12. Salt Lake City Area Integrated Projects electric power marketing -- Final environmental impact statement. Volume 1: Summary

    International Nuclear Information System (INIS)

    1996-01-01

    The Colorado River Storage Project Customer Service Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Colorado, Green, Gunnison, and Rio Grande rivers and on Plateau Creek in Arizona, Colorado, Utah, Wyoming, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams) are influenced by Western power scheduling and transmission decisions. The environmental impact statement (EIS) alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Western's firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this EIS include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources. Western has identified commitment-level alternative 1, the Post-1989 commitment level, as its preferred alternative. The impact evaluations indicate that this commitment level is also the environmentally preferred alternative

  13. Merging Regular and Special Education Teacher Preparation Programs: The Integrated Special Education-English Project (ISEP).

    Science.gov (United States)

    Miller, Darcy E.

    1991-01-01

    Describes the Integrated Special Education-English Project (ISEP) which facilitated the gradual integration of special education and English teacher preparation programs. A description of the ISEP model and a case study are included. The case study indicated student teachers who participated in the ISEP improved special education and English…

  14. Mission Need Statement: Calcine Disposition Project Major Systems Acquisition Project

    International Nuclear Information System (INIS)

    J. T. Beck

    2007-01-01

    This document identifies the need to establish the Calcine Disposition Project to determine and implement the final disposition of calcine including characterization, retrieval, treatment (if necessary), packaging, loading, onsite interim storage pending shipment to a repository or interim storage facility, and disposition of related facilities

  15. University of Texas Safeguards by Design Problem Statement

    Energy Technology Data Exchange (ETDEWEB)

    Rauch, Eric Benton [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Scherer, Carolynn P. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Ruggiero, Christy E. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2018-01-22

    This document describes the problem statement that students at the University of Texas will use for their senior level capstone design class. The purpose of this project is to introduce students to Safeguards by Design concepts as part of their capstone design course at the culmination of their degree program. This work is supported by Los Alamos National Laboratory with FY17 and FY18 programmatic funding from the U. S. Department of Energy’s (DOE) National Nuclear Security Administration (NNSA), through the Office of Defense Nuclear Nonproliferation (DNN), Office of International Nuclear Safeguards (INS), Next Generation Safeguards Initiative (NGSI), Human Resource Development Program, Safeguards by Design Project.

  16. 76 FR 70483 - Environmental Impact Statement and General Management Plan, Paterson Great Falls National...

    Science.gov (United States)

    2011-11-14

    ... planning process and will remain actively involved throughout the development of the plan. Prepared by... the long-term management of Paterson Great Falls NHP early in the process through public meetings and... Impact Statement and General Management Plan, Paterson Great Falls National Historical Park, NJ AGENCY...

  17. Final environmental statement related to the operation of St. Lucie Plant, Unit No. 2. Docket No. 50-389, Florida Power and Light Company, Orlando Utilities Commission of the City of Orlando, Florida

    International Nuclear Information System (INIS)

    1982-04-01

    This final environmental statement was prepared by the US Nuclear Regulatory Commission (NRC), Office of Nuclear Reactor Regulation (the staff) in accordance with the Commission's Regulations, set forth in 10 CFR Part 51, which implement the requirements of the National Environmental Policy Act of 1969 (NEPA). Sections related to the aquatic environment were prepared in cooperation with the US Environmental Protection Agency, Region IV. This statement reviews the impact of operation of the St. Lucie Plant, Unit 2. Assessments that are found in this statement supplement those described in the Final Environmental Statement (FES-CP) that was issued in May 1974 in support of issuance of a construction permit for the unit

  18. 76 FR 47608 - Notice of Availability of the Final Environmental Impact Statement for the Rice Solar Energy, LLC...

    Science.gov (United States)

    2011-08-05

    ... Availability of the Final Environmental Impact Statement for the Rice Solar Energy, LLC Rice Solar Energy... Desert Conservation Area (CDCA) Plan Amendment for the Rice Solar Energy Project (RSEP) in Riverside... proposed Rice Solar Energy Project (Project) is a 150 megawatt (MW) solar electric power plant that would...

  19. Have personal statements become impersonal? An evaluation of personal statements in anesthesiology residency applications.

    Science.gov (United States)

    Max, Bryan A; Gelfand, Brian; Brooks, Meredith R; Beckerly, Rena; Segal, Scott

    2010-08-01

    To evaluate personal statements submitted to a major academic anesthesiology program to determine the prevalence of common features and overall subjective quality, and to survey anesthesiology program directors as to how they utilized these statements during the resident selection process. Structured analysis of de-identified personal statements and Internet-based survey of program directors. Large academic anesthesiology training program. 670 applicant personal statements and academic anesthesiology program directors. Prevalence of 13 specific essay features and 8 quality ratings were calculated for the essays and correlated with other aspects of the residency application, as abstracted from the Electronic Residency Application Service (ERAS) files. A 6-question survey regarding use of personal statements was collected from program directors. 70 of 131 program directors queried responded to our survey. Interest in physiology and pharmacology, enjoyment of a hands-on specialty, and desire to comfort anxious patients were each mentioned in more than half of the essays. Candidates invited for an interview had essays that received higher quality ratings than essays of those not invited (P = 0.02 to P essay. Only 41% found the personal statement to be very or somewhat important in selecting candidates for interview invitations. However, over 90% stated that they used the statements during actual interviews with invited applicants. The data showed a high prevalence of common features found within personal statements and a general ambivalence amongst those program directors for whom the statements were intended. Copyright 2010 Elsevier Inc. All rights reserved.

  20. The decision on the application to carry out a decommissioning project at Hinkley Point A Power Station under the Nuclear Reactors (Environmental Impact Assessment for Decommissioning) Regulations 1999

    International Nuclear Information System (INIS)

    2003-01-01

    European Council Directive 85/337/EEC, as amended by Council Directive 97/1 I/EC, sets out a framework on the assessment of the effects of certain public and private projects on the environment. The Directive is implemented in Great Britain for decommissioning nuclear reactor projects by the Nuclear Reactors (Environmental Impact Assessment for Decommissioning) Regulations 1999. The intention of the Directive and Regulations is to involve the public through consultation in considering the potential environmental impacts of a decommissioning project, and to make the decision-making process on granting consent open and transparent. The Regulations require the licensee to undertake an environmental impact assessment, prepare an environmental statement that summarises the environmental effects of the project, and apply to the Health and Safety Executive (HSE) for consent to carry out a decommissioning project. There is an optional stage where the licensee may request from HSE an opinion on what the environmental statement should contain (called a pre-application opinion). The licensee of Hinkley Point A Power Station, Magnox Electric pie, requested a pre-application opinion and provided information in a scoping report in December 2000. HSE undertook a public consultation on the scoping report and provided its pre- application opinion in April 2001. The licensee applied to HSE for consent to carry out a decommissioning project and provided an environmental statement in December 2001. Following a public consultation on the environmental statement, HSE requested further information that was subsequently provided by the licensee. A further public consultation was undertaken on the further information that ended in March 2003. All these public consultations involved around 60 organisations. HSE granted consent to carry out a decommissioning project at Hinkley Point A Power Station under the Regulations in July 2003, and attached conditions to the Consent. HSE took relevant

  1. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  2. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  3. 2004 Power marketing program final EIS - final environmental impact statement. Volume 2 - appendices

    International Nuclear Information System (INIS)

    1997-02-01

    This volume contains appendices to the Final Environmental Impact Statement (FEIS) for the Power Marketing Program proposal of the Western Area Power Administration. The FEIS identified peaking power scheduling as the environmentally preferred alternative, and presented the analysis of alternatives and environmental impacts. Sixteen appendices to the FEIS are included in this document. The appendices are: Statutory and Legal Framework; Sierra Nevada Region Customer Groups and Economic Regions; Renewable Technology Cost Information Matrix; Hydrological Assumptions; Recreation Resources; Archaeological and Historical Resources; Incremental Power Resources; Air Quality Regulatory Structure; Energy Generation; Stage Contents Relationships for Regulating Reservoirs; Power Costs; Socioeconomic Impacts; Projected Air Resource Impacts; Land use, Water Quality, and Solid Waste Impact Factors; Draft Environmental Impact Statement Comments and Responses, and Contractor Disclosure Statements. 21 figs., 24 tabs

  4. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 1: Environmental Analysis and Technical Appendices.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and in comments on the Draft Environmental Impact Statement (EIS) include: (1) potential air quality impacts, such as emissions and their contribution to the {open_quotes}greenhouse{close_quotes} effect; (2) potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields; and (3) potential water quality and quantity impacts, such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial. The EIS is being mailed to numerous agencies, groups, and individuals (see Section 8.0). There will be a 30-day no-action period before any decisions are made and the Record of Decision is signed.

  5. Final Environmental Impact Statement and Environmental Impact Report for continued operation of Lawrence Livermore National Laboratory and Sandia National Laboratories, Livermore

    International Nuclear Information System (INIS)

    1992-08-01

    This Environmental Impact Statement/Environmental Impact Report (EIS/EIR) is prepared pursuant to the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). This document analyzes the potential environmental impacts of the proposed action: continued operation, including near-term (within 5 to 10 years) proposed projects, of Lawrence Livermore National Laboratory (LLNL) and Sandia National Laboratories, Livermore (SNL, Livermore). Additionally, this document analyzes a no action alternative involving continuing operations at FY 1992 funding levels without further growth, a modification of operations alternative to reduce adverse environmental impacts of operations or facilities, and a shutdown and decommissioning alternative of UC discontinuing its management of LLNL after the current contract expires on September 30, 1992. This document assesses the environmental impacts of the Laboratories' operations on air and water quality, geological and ecological systems, occupational and public health risks, prehistoric and historic resources, endangered species, floodplains and wetlands, socioeconomic resources, hazardous waste management, site contamination, and other environmental issues. The EIS/EIR is divided into five volumes and two companion reports. This volume contains copies of the written comments and transcripts of individual statements at the public hearing and the responses to them

  6. Resource Programs : Draft Environmental Impact Statement, Volume 2, Appendices.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-03-01

    Every two years, Bonneville Power Administration (BPA) prepares a Resource Program which identifies the resource actions BPA will take to meet its obligation to serve the forecasted power requirements of its customers. The Resource Program`s Environmental Impact Statement (RPEIS) is a programmatic environmental document which will support decisions made in several future Resource Programs. Environmental documents tiered to the EIS may be prepared on a site-specific basis. The RPEIS includes a description of the environmental effects and mitigation for the various resource types available in order to evaluate the trade-offs among them. It also assesses the environmental impacts of adding thirteen alternative combinations of resources to the existing power system. This report contains the appendices to the RPEIS.

  7. Management and Communication of the Companies' Knowledge; Guidelines for Intellectual Capital Statement

    Directory of Open Access Journals (Sweden)

    Justyna Fijalkowska

    2008-04-01

    Full Text Available This paper aims at analyzing the development of guidelines on Intellectual Capital Statement, providing a comparison of them and presenting their importance within the knowledge management process of the today's companies. We entered the Knowledge Era in which the basic economic resources are no longer financial capital, physical resources, or labor, but knowledge, called also intellectual capital (IC. Many analysts and investors demand for more information and they highlight the gap that exists between the information found in companies' annual reports and the financial information regarding intangible part of the company requested by the market. Knowledge of the company should be measured and the effects should be communicated, as measurement without any further action has no sense. Intellectual capital statement seems an appropriate tool for that and becomes an integral part of the knowledge management of the modern enterprise. This kind of statement emphasizes the role of IC in relation to the value creation and communicates how knowledge resources are managed in the firms within a strategic objectives. This paper compares different approaches to IC statement preparation: underlines similarities and differences concerning the scope, methodology and terminology used and ensuing consequences. It raises significant implications for managers of the companies, researches and policy makers.

  8. 75 FR 57005 - Notice of Availability of Draft Environmental Impact Statement and Public Hearings for the...

    Science.gov (United States)

    2010-09-17

    ... Statement and Public Hearings for the Proposed Energia Sierra Juarez U.S. Transmission Project (ESJ-U.S... Energia Sierra Juarez U.S. Transmission Line Project'' (DOE/EIS-0414) for public comment. DOE also... environmental impacts of DOE's proposed Federal action of issuing a Presidential permit to Energia Sierra Juarez...

  9. 76 FR 51957 - Notice of Intent To Prepare an Environmental Impact Statement for the Medical Facilities...

    Science.gov (United States)

    2011-08-19

    ... Statement for the Medical Facilities Development and University Expansion at Naval Support Activity Bethesda...: Notice. SUMMARY: Pursuant to section (102)(2)(c) of the National Environmental Policy Act (NEPA) of 1969, the regulations implemented by the Council on Environmental Quality (40 Code of Federal Regulations...

  10. 75 FR 58370 - Notice of Intent To Prepare a Legislative Environmental Impact Statement for the Proposed...

    Science.gov (United States)

    2010-09-24

    ... Environmental Impact Statement for the Proposed Extension of the Chocolate Mountain Aerial Gunnery Range Land... Riverside counties, California, for continued military use of the Chocolate Mountain Aerial Gunnery Range... addressing legislative alternatives and the effects of continued withdrawal. The CMAGR Draft L-EIS will...

  11. Final environmental statement for La Crosse Boiling Water Reactor: (Docket No. 50-409)

    International Nuclear Information System (INIS)

    1980-04-01

    A Final Environmental Statement for the Dairyland Power Cooperative for the conversion from a provisional to a full-term operating license for the La Crosse Boiling Water Reactor, located in Vernon County, Wisconsin, has been prepared by the Office of Nuclear Reactor Regulation. This statement provides a summary of environmental impacts and adverse effects of operation of the facility, and a consideration of principal alternatives (including removal of LACBWR from service, alternative cooling methodology, and alternative waste treatment systems). Also included are the comments of federal, state, and local governmental agencies and certain non-governmental organizations on the La Crosse Draft Environmental Statement and staff responses to these comments. After weighing environmental, economic, and technical benefits and liabilities, the staff recommends conversion from a provisional operating license to a full-term operating license, subject to specific environmental protection limitations. An operational monitoring program shall be established as part of the Environmental Technical Specifications. 64 refs., 20 figs., 48 tabs

  12. Nevada Test Site, Nye County, Nevada. Final environmental impact statement

    International Nuclear Information System (INIS)

    1977-09-01

    This environmental statement for the Nevada Test Site (NTS) considers underground nuclear detonations with yields of one megaton or less, along with the preparations necessary for such detonations. The testing activities considered also include other continuing and intermittent activities, both nuclear and nonnuclear, which can best be conducted in the remote and controlled area of the Nevada Test Site. These activities are listed, with emphasis on weapons testing programs which do not remain static

  13. Nevada Test Site, Nye County, Nevada. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1977-09-01

    This environmental statement for the Nevada Test Site (NTS) considers underground nuclear detonations with yields of one megaton or less, along with the preparations necessary for such detonations. The testing activities considered also include other continuing and intermittent activities, both nuclear and nonnuclear, which can best be conducted in the remote and controlled area of the Nevada Test Site. These activities are listed, with emphasis on weapons testing programs which do not remain static.

  14. Bid Preparation and Evaluation for Nuclear Power Plant Project Management

    International Nuclear Information System (INIS)

    Mohd Idris Taib, Mohd Khairulezwan Abdul Manan and Nur Farizan Amadzun

    2011-01-01

    Bid preparation and evaluation is one of the main activities in Nuclear Power Plant Project management. International Atomic Energy Agency guide and Korean experience was studied for Malaysian requirement in realization of first Nuclear Power Plant. Several aspects shall be taken into consideration such as political scenario, financial capabilities, sitting, human resource, technologies, fuel supplies and decommissioning for long term exceeded hundred years. Bidding process and activities is proposed for our country requirement. The main activities included but unlimited to Bid Invitation Specification, Bid Evaluation Process, Technical Evaluation, Economic Bid Evaluation and Contracting. On the end of day, Malaysia need safe and reliable Nuclear Power Plant. Malaysian Economic Transformation Programme also get benefit from spin-off localization products and services as well as Technology Transfer Programme. (author)

  15. 75 FR 60405 - Lincoln National Forest, New Mexico, Integrated Non-Native Invasive Plant Project

    Science.gov (United States)

    2010-09-30

    ... Environmental Impact Statement. SUMMARY: The Lincoln National Forest (LNF) proposes to implement an integrated... by November 29, 2010. The draft environmental impact statement is expected January 2011 and the final environmental impact statement is expected April 2011. ADDRESSES: Send written comments to NNIP Project, Lincoln...

  16. Revision of the International Pharmaceutical Federation's Basel Statements on the future of hospital pharmacy: From Basel to Bangkok.

    Science.gov (United States)

    Vermeulen, Lee C; Moles, Rebekah J; Collins, Jack C; Gray, Andy; Sheikh, Abdul Latif; Surugue, Jacqueline; Moss, Robert J; Ivey, Marianne F; Stevenson, James G; Takeda, Yasuo; Ranjit, Eurek; Chaar, Betty; Penm, Jonathan

    2016-07-15

    The processes used to revise the 2008 Basel Statements on the future of hospital pharmacy are summarized, and the revised statements are presented. The process for revising the Basel Statements followed an approach similar to that used during their initial development. The Hospital Pharmacy Section (HPS) of the International Pharmaceutical Federation (FIP) revised the 2008 FIP Basel Statements in four phases, including a survey of hospital pharmacists worldwide, an internal review, online forums, and a face-to-face "World Café" workshop in Bangkok, Thailand. The global survey on the initial Basel Statements included input from 334 respondents from 62 countries. The majority of respondents agreed that most of the initial Basel Statements were acceptable as written and did not require revision. In total, 11 statements were judged by more than 10% of respondents as needing revision or deletion. The FIP HPS executive committee used the survey results to develop 69 initial revised draft statements. After an online discussion with the international hospital pharmacy community, including individuals from 28 countries representing all six World Health Organization regions, a final set of draft statements was prepared for the live discussion involving participants from 20 countries. The final 65 revised Basel Statements were voted on and accepted. Systematic revision of the FIP Basel Statements resulted in an updated reflection of aspirational goals for the future of hospital pharmacy practice. While this revision reflects the development of new goals for hospital pharmacy practice, the core principles of the Basel Statements remain an essential foundation for the discipline. Copyright © 2016 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  17. Healthcare Financial Management Association, Principles and Practices Board. Statement No. 16. Classifying, valuing, and analyzing accounts receivable related to patient services.

    Science.gov (United States)

    1993-05-01

    This Principles and Practices Board project was undertaken in response to the frequent requests from HFMA members for a standard calculation of "days of revenue in receivables." The board's work on this project indicated that every element of the calculation required standards, which is what this statement provides. Since there have been few standards for accounts receivable related to patient services, the industry follows a variety of practices, which often differ from each other. This statement is intended to provide a framework for enhanced external comparison of accounts receivable related to patient services, and thereby improve management information related to this very important asset. Thus, the standards described in this statement represent long-term goals for gradual transition of recordkeeping practices and not a sudden or revolutionary change. The standards described in this statement will provide the necessary framework for the most meaningful external comparisons. Furthermore, management's understanding of deviations from these standards will immediately assist in analysis of differences in data between providers.

  18. Environmental assessment report on proposed Yeelirrie uranium project

    International Nuclear Information System (INIS)

    1979-01-01

    In accordance with Government requirements, Western Mining Corporation Ltd. has prepared a Draft Environmental Impact Statement/Environmental Review and Management Programme for its proposed uranium mine development at Yeelirrie, Western Australia. This report includes an outline of the proposal, an enviromental assessment, recommendations by the Environmental Protection Authority made after consideration of the Company's draft statement and a review of public and State Government Departmental Submissions received on the Yeelirrie EIS/ERMP

  19. Fundamentals of Project Management

    CERN Document Server

    Heagney, Joseph

    2011-01-01

    With sales of more than 160,000 copies, Fundamentals of Project Management has helped generations of project managers navigate the ins and outs of every aspect of this complex discipline. Using a simple step-by-step approach, the book is the perfect introduction to project management tools, techniques, and concepts. Readers will learn how to: ò Develop a mission statement, vision, goals, and objectives ò Plan the project ò Create the work breakdown structure ò Produce a workable schedule ò Understand earned value analysis ò Manage a project team ò Control and evaluate progress at every stage.

  20. Olympic Dam project: draft environmental impact statement

    International Nuclear Information System (INIS)

    1982-10-01

    The Olympic Dam deposit, South Australia, is estimated to contain at least 2,000 million tonnes of mineralized material, with an average grade of about 1.6% copper, 0.6 Kg/t of uranium oxide and 0.6 g/t of gold. The objective of the project is to extract and process the ore for the production and sale of copper, uranium oxide and the associated gold and silver. Facilities required are an underground mine, an on-site processing plant, associated facilities including a tailings retention system, a town to accommodate up to 9,000 people and other infrastructure. Chapters in the draft E.I.S. contain information on the environment, land use, aboriginal environment, geology, tailings retention system, radiation assessment, project infrastructure, social effects and economic effects