Results of nine Connecticut Cancer Partnership implementation projects.
Morra, Marion E; Mowad, Linda Z; Hogarty, Lucinda Hill; Kettering, Shiu-Yu
2012-01-01
The Connecticut Cancer Partnership (Partnership), through funds from the Connecticut legislature, the AttorneyGeneral Fund and some limited federal funding, has spearheaded the implementation of a series of projects by Connecticut institutions and State of Connecticut departments. Among them are projects in prevention, detection, treatment, survivorship and end-of-life care, along with programs that target ethnic and uninsured populations. This article highlights funding sources, procedures for choosing projects and summaries for nine completed projects of interest to practicing physicians. It also includes a listing of additional projects currently underway. The use of shared funding among the State's partners highlights the energy of the Partnership in carrying out the common vision embodied in the Connecticut Cancer Plan.
2011-05-10
... Promulgation of Implementation Plans; Connecticut: Prevention of Significant Deterioration; Greenhouse Gas... Significant Deterioration (PSD) program. First, the revision provides Connecticut with authority to issue PSD... Regional Office, Office of Ecosystem Protection, Air Permits, Toxics, and Indoor Air Programs Unit, 5 Post...
2011-03-23
... enforceable emission limits on ozone precursors; any judgment about whether those emission limits discharge... attainment demonstration modeling efforts conducted by the Ozone Transport Commission. Connecticut, Maine... Implementation Plans; Connecticut, Maine, New Hampshire and Rhode Island; Infrastructure SIPs for the 1997 Ozone...
Connecticut warm mix asphalt (WMA) pilot projects 2010 and 2011.
2014-06-01
WMA overlays were placed in several pilot projects in Connecticut during the 2010 and 2011 construction : seasons. These technologies included Sasobit, Evotherm, Advera, Double-Barrel Green foamed : asphalt as well as SonneWarmix. The res...
2013-05-24
... equipment is required to control VOC emissions by one of the following methods: Use of an enclosed gun... keeping; air pollution control equipment requirements; surface preparation requirements; and spray gun... and Promulgation of Air Quality Implementation Plans; Connecticut; Reasonably Available Control...
Hirth, Richard A; Cliff, Elizabeth Q; Gibson, Teresa B; McKellar, M Richard; Fendrick, A Mark
2016-04-01
In 2011 Connecticut implemented the Health Enhancement Program for state employees. This voluntary program followed the principles of value-based insurance design (VBID) by lowering patient costs for certain high-value primary and chronic disease preventive services, coupled with requirements that enrollees receive these services. Nonparticipants in the program, including those removed for noncompliance with its requirements, were assessed a premium surcharge. The program was intended to curb cost growth and improve health through adherence to evidence-based preventive care. To evaluate its efficacy in doing so, we compared changes in service use and spending after implementation of the program to trends among employees of six other states. Compared to employees of other states, Connecticut employees were similar in age and sex but had a slightly higher percentage of enrollees with chronic conditions and substantially higher spending at baseline. During the program's first two years, the use of targeted services and adherence to medications for chronic conditions increased, while emergency department use decreased, relative to the situation in the comparison states. The program's impact on costs was inconclusive and requires a longer follow-up period. This novel combination of VBID principles and participation requirements may be a tool that can help plan sponsors increase the use of evidence-based preventive services. Project HOPE—The People-to-People Health Foundation, Inc.
Energy Technology Data Exchange (ETDEWEB)
Gingerich, R.E. [Connecticut Hazardous Waste Management Service, Hartford, CT (United States)
1993-03-01
Connecticut is a member of the Northeast Interstate Low-Level Radioactive Waste Management Compact (Northeast LLRW Compact). The other member of the Northeast LLRW Compact is New Jersey. The Northeast Interstate Low-Level Radioactive Waste Commission (Northeast Compact Commission), the Northeast LLRW Compact`s governing body, has designated both Connecticut and New Jersey as host states for disposal facilities. The Northeast Compact Commission has recommended that, for purposes of planning for each state`s facility, the siting agency for the state should use projected volumes and characteristics of the LLW generated in its own state. In 1987 Connecticut enacted legislation that assigns major responsibilities for developing a LLW disposal facility in Connecticut to the Connecticut Hazardous Waste Management Service (CHWMS). The CHWMS is required to: prepare and revise, as necessary, a LLW Management Plan for the state; select a site for a LLW disposal facility; select a disposal technology to be used at the site; select a firm to obtain the necessary approvals for the facility and to develop and operate it; and serve as the custodial agency for the facility. This paper discusses progress in developing a facility.
Connecticut ITS/CVO business plan : final report
1998-06-01
This document describes: goals and objectives for Connecticut ITS/CVO deployment; current regulatory structure and activities; envisioned process changes enabled by ITS/CVO technologies; how motor carriers perceive the value of ITS/CVO services; bene...
French, R. A.; Felson, A. J.; Kirmmse, E.; Hagemann, K.
2015-12-01
Connecticut's densely developed coastline is highly vulnerable to sea level rise and coastal storms. 95% of the state's entire population lives within 50 miles of the shore. Connecticut has more than $542 billion in insured assets in harms way, only Florida has a greater exposure. As part of the state of Connecticut Phase 1 application for the HUD National Disaster Resilience Competition, the Connecticut Institute for Resilience and Climate Adaptation (CIRCA) at the University of Connecticut undertook an assessment of coastal vulnerabilities, including the impacts of sea level rise on the frequency of flooding, socioeconomic factors, critical infrastructure, and housing using data collected from federal, state, and municipal sources. Connecticut's unique geology, characterized by a glaciated coastline with highly erodible former deltas and elevated ridgelines extending out to rocky headlands, became the basis of the climate adaptation approach. Together with a nine state agency workgroup, municipal and regional government, and non-profit and industry representatives, CIRCA and the Yale UED lab developed a long-term urban redevelopment solution of resilient access and egress corridors layered over ridgelines and resilient zones of transit oriented economic development linked to shoreline communities. This concept can be applied in both Connecticut's coastal cities like New Haven and its smaller towns. The process demonstrated the effective partnership between the universities and state agencies in bringing the science of flood modeling and mapping together with innovative design to create solutions for climate adaptation. However, it also revealed significant gaps in data availability to analyze the economic and social drivers for adopting different adaptation strategies. Furthermore, the accuracy of current flood mapping tools needs to be improved to predict future flooding at the municipal project scale. As Connecticut and other states move forward with resilience
Frederick, Jennifer
2010-09-01
College and university science educators from across Connecticut gathered at Yale's West Campus in April 2010 for a Project Kaleidoscope (PKAL) program entitled "Taking the Plunge: Next Steps in Engaged Learning." Funded by the National Science Foundation (NSF) and co-sponsored by the Connecticut Conference of Independent Colleges (CCIC) and Yale's McDougal Graduate Teaching Center, the event was the latest in a PKAL series of one-day conferences aimed at equipping science, technology, engineering, and math (STEM) instructors with effective approaches to engaging students and training future scientists.
2015 USACE NAE Topobathy Lidar DEM: Connecticut
National Oceanic and Atmospheric Administration, Department of Commerce — These data were collected for the USACE New England District (NAE). The data set is made up of 13 small projects in Connecticut. These projects are: Bridgeport,...
Interactive Distance Learning in Connecticut.
Pietras, Jesse John; Murphy, Robert J.
This paper provides an overview of distance learning activities in Connecticut and addresses the feasibility of such activities. Distance education programs have evolved from the one dimensional electronic mail systems to the use of sophisticated digital fiber networks. The Middlesex Distance Learning Consortium has developed a long-range plan to…
Humanities Programming in Public Libraries: The Connecticut Perspective.
Rader, Barbara A.
1990-01-01
Describes how public libraries can plan, fund, and implement scholar-led, library-based, humanities book discussion programs using the example of the Southern Connecticut Library Council. Key steps in planning, funding, targeting the audience, selecting topics and books, obtaining community support, recruiting scholars, marketing, administration,…
2013-06-27
... reasonably available control technology (RACT) for oxides of nitrogen (NO X ) and volatile organic compounds.... I. Background and Purpose II. Connecticut's Reasonably Available Control Technology Certification... controlling volatile organic compound emissions that Connecticut submitted to EPA on July 20, 2007. \\1\\ The...
National Research Council Canada - National Science Library
1996-01-01
.... This plan provides guidance to establish policies, and responsibilities, procedures, and instructions for proper handling, storage, disposal and recycling of solid waste generated at the flood control project...
Connecticut State Briefing Book for low-level radioactive-waste management
International Nuclear Information System (INIS)
1981-06-01
The Connecticut State Briefing Book is one of a series of state briefing books on low-level radioactive waste management practices. It has been prepared to assist state and federal agency officials in planning for safe low-level radioactive waste disposal. The report contains a profile of low-level radioactive waste generators in Connecticut. The profile is the result of a survey of Nuclear Regulatory Commission licensees in Connecticut. The briefing book also contains a comprehensive assessment of low-level radioactive waste management issues and concerns as defined by all major interested parties including industry, government, the media, and interest groups. The assessment was developed through personal communications with representatives of interested parties, and through a review of media sources. Lastly, the briefing book provides demographic and socioeconomic data and a discussion of relevant government agencies and activities, all of which may affect waste management practices in Connecticut
Survey of Connecticut Nurse-Midwives.
Holland, Margaret L; Holland, Eliza S
2007-01-01
Descriptive data on nurse-midwifery income, workload, job definitions, employment benefits, and clinical practices are limited. Information about nurse-midwifery practice today is important for the growth of the profession and for future policy initiatives. A survey of nurse-midwives in Connecticut was conducted in 2005. This article reports state-specific data about income, workload, job definitions, employment benefits, and clinical issues, such as vaginal birth after cesarean. Full-time midwives in Connecticut worked an average of 77 hours per week, had a mean salary of 79,554 dollars, and 87% had on-call responsibilities. A "typical" Connecticut midwife had an "average" full-time work week consisting of two 24-hour call days and three 7-hour office days, seeing 19 to 24 patients per office day. Most held Master of Science in Nursing degrees, worked in physician-owned practices, and attended births in hospitals or medical centers. Health insurance, paid sick time, and retirement plans were offered to most respondents. Almost all respondents provide gynecologic, antepartum, and postpartum care, but few offer newborn care. There is significant variation in restrictions on midwives offering vaginal birth after cesarean and on length of scheduled appointments. Data on expanded practices, such as first-assisting caesarean sections and endometrial biopsies, are reported for the first time.
Life cycle costs for disposal and assured isolation of low-level radioactive waste in Connecticut
International Nuclear Information System (INIS)
Chau, B.; Sutherland, A.A.; Baird, R.D.
1998-03-01
This document presents life cycle costs for a low-level radioactive disposal facility and a comparable assured isolation facility. Cost projections were based on general plans and assumptions, including volume projections and operating life, provided by the Connecticut Hazardous Waste Management Service, for a facility designed to meet the State's needs. Life cycle costs include the costs of pre-construction activities, construction, operations, closure, and post-closure institutional control. In order to provide a better basis for understanding the relative magnitude of near-term costs and future costs, the results of present value analysis of ut-year costs are provided
2016 Coastal Connecticut MLLW ADS80 4-Band 16 Bit Imagery
National Oceanic and Atmospheric Administration, Department of Commerce — Project: NOAA 2016 Multispectral Coastal Imagery Project - Connecticut Shoreline Orthoimagery Contract No. EA133C11CQ0010 Reference No. NCNP0000-16-01163 Woolpert...
Literacy and the Black Church: A Demonstration Project in Connecticut.
Lakes, Richard D.; Lewis, Linda H.
1990-01-01
The Literacy Improvement Needs Collaboration in Bridgeport, Connecticut, was assisted by African-American ministers from the Interdenominational Ministerial Alliance in recruiting adults from the community for a literacy program and 50 volunteers to serve as tutors and community liaisons. Some of the stigma of illiteracy was alleviated by using…
Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus Preliminary Evaluation Results
2008-10-16
This report describes operations at Connecticut Transit (CTTRANSIT) in Hartford for one prototype fuel cell bus and three new diesel buses operating from the same location. The report discusses the planned fuel cell bus demonstration and equipment us...
Providing Flood Risk Science for Resilient Transportation Infrastructure Decisions in Connecticut
French, R.; Cifuentes-Lorenzen, A.; Kooris, D.; O'Donnell, J.
2017-12-01
The Connecticut Institute for Resilience and Climate Adaptation (CIRCA) provides actionable science to accelerate adaptation and resilience strategies for Connecticut's inland and coastal waterways communities. Connecticut's coastal area has some of the most valuable real estate in the United States due to the Metro North and Shoreline East commuter rail line that connects all 24 coastal municipalities through transit hubs to the New York City metropolitan region. On its way to NY, the rail runs through neighborhoods and coastal marshes and crosses local and state roads. During coastal storms and increasingly at high tides as the sea level rises, the rail line may act like a berm, but also cuts off coastal neighborhoods from the upland. When it crosses a road in a marsh setting, the clearance restriction also severely limits communities' options for moving or elevating the roadway. These flooded roadways and vulnerable transit hubs are already a challenge for municipalities and will continue to be in the future. However, given scarce resources, it is not sufficient to simply know that they are vulnerable using existing low resolution mapping tools. Communities need site-specific, exact estimates of frequency of flooding, incorporating future sea level rise, to make cost determinations and accurately project the useful life of their investment. To address this need CIRCA developed high-resolution dynamic coastal flood risk models and partnered with municipal staff, regional planning bodies and the state to apply them to infrastructure decision-making. We will present three case studies of this approach: 1) the implementation of the US HUD National Disaster Resilience Competition pilot project of road elevation and berm construction in partnership with the Department of Housing and the City of Bridgeport; 2) the City of New London's first rail and ferry transit hub vulnerability assessment for sea level rise and storms and 3) the flooding frequency of a state road
Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Preliminary Evaluation Results
Energy Technology Data Exchange (ETDEWEB)
Chandler, K.; Eudy, L.
2008-10-01
This report provides preliminary results from a National Renewable Energy Laboratory evaluation of a protoptye fuel cell transit bus operating at Connecticut Transit in Hartford. Included are descriptions of the planned fuel cell bus demonstration and equipment; early results and agency experience are also provided.
NOAA Digital Orthophotography for the Coasts of Connecticut and Long Island, NY
National Oceanic and Atmospheric Administration, Department of Commerce — Project: NOAA Digital Orthophotography for the Coasts of Main/New Hampshire, Massachusetts/Rhode Island/Connecticut, and Hudson River/Long Island /NY/NJ Contract No....
77 FR 776 - Agenda and Notice of Public Meeting of the Connecticut Advisory Committee
2012-01-06
.... Commission on Civil Rights (Commission), and the Federal Advisory Committee Act (FACA), that a planning... convene at 12:00 noon (EST) Friday, January 13, 2012. The purpose of the planning meeting is to work to... COMMISSION ON CIVIL RIGHTS Agenda and Notice of Public Meeting of the Connecticut Advisory...
Effects of environmental pollutants on Connecticut and Maryland ospreys
Wiemeyer, Stanley N.; Spitzer, P.R.; Krantz, W.C.; Lamont, T.G.; Cromartie, E.
1975-01-01
Osprey (Pandion haliaetus) eggs were exchanged between Connecticut and Maryland osprey nests in 1968 and 1969 to test the hypothesis that the decline in reproductive success of Connecticut ospreys was caused by something within the external environment of the eggs. Incubation of 30 Connecticut osprey eggs by Maryland ospreys did not improve the hatching rate. Forty-five Maryland osprey eggs incubated by Connecticut ospreys hatched at their normal rate. The results of the egg exchanges and associated observations indicated that the most probable cause of the poor reproduction of Connecticut ospreys ,was related to contamination of the birds and their eggs. Residues of DDT and its metabolites, dieldrin, and PCBs were generally higher in fish from Connecticut than from Maryland. During 1968-69, average residues (on a nest basis) in osprey eggs from Maryland were: p,p'-DDE, 2.4 ppm; dieldrin, 0.25 ppm; PCB, 2.6 ppm. Average residues in eggs from Connecticut for the same period were: p,p'DDE, 8.9 ppm; dieldrin, 0.61 ppm; PCB, 15 ppm. There were no major changes in residue content of Connecticut eggs collected in 1964 compared with those collected in 1968-B9. One Connecticut osprey had a concentration of dieldrin in its brain which was in the lethal range. The average shell thickness of recently collected osprey eggs from Connecticut had declined 18 percent, and those from Maryland had declined 10 percent from pre-1947 norms. Dieldrin, DDE, and PCB are three environmental pollutants that have most likely been important factors in the greatly reduced reproductive success and rapid population decline of Connecticut ospreys.
78 FR 54962 - Approval and Promulgation of Air Quality Implementation Plans; Connecticut; NOX
2013-09-09
..., Suite 100, (OEP05-2), Boston, MA 02109-3912, phone number (617) 918-1657, fax number (617) 918-0657... of Mental Health and Addiction Services. 8111 Modification Uniroyal Chemical.. Naugatuck. 8118... Modification No. 1 issued to State of Connecticut Department of Mental Health and Addiction Services in...
Early Medicaid Expansion In Connecticut Stemmed The Growth In Hospital Uncompensated Care.
Nikpay, Sayeh; Buchmueller, Thomas; Levy, Helen
2015-07-01
As states continue to debate whether or not to expand Medicaid under the Affordable Care Act (ACA), a key consideration is the impact of expansion on the financial position of hospitals, including their burden of uncompensated care. Conclusive evidence from coverage expansions that occurred in 2014 is several years away. In the meantime, we analyzed the experience of hospitals in Connecticut, which expanded Medicaid coverage to a large number of childless adults in April 2010 under the ACA. Using hospital-level panel data from Medicare cost reports, we performed difference-in-differences analyses to compare the change in Medicaid volume and uncompensated care in the period 2007-13 in Connecticut to changes in other Northeastern states. We found that early Medicaid expansion in Connecticut was associated with an increase in Medicaid discharges of 7-9 percentage points, relative to a baseline rate of 11 percent, and an increase of 7-8 percentage points in Medicaid revenue as a share of total revenue, relative to a baseline share of 10 percent. Also, in contrast to the national and regional trends of increasing uncompensated care during this period, hospitals in Connecticut experienced no increase in uncompensated care. We conclude that uncompensated care in Connecticut was roughly one-third lower than what it would have been without early Medicaid expansion. The results suggest that ACA Medicaid expansions could reduce hospitals' uncompensated care burden. Project HOPE—The People-to-People Health Foundation, Inc.
Connecticut church passes genetics resolution.
Culliton, B J
1984-11-09
The Connecticut Conference of the United Church of Christ, which represents the largest Protestant denomination in the state, has passed a resolution affirming an ethical duty to do research on human gene therapy and is planning to form local church groups to study the scientific and ethical issues involved. The resolution is intended to counter an earlier one proposed by Jeremy Rifkin to ban all efforts at engineering specific traits into the human germline. The Rifkin proposal had been endorsed by a large number of religious leaders, including the head of the U.S. United Church of Christ, but was subsequently characterized by many of the church leaders as overly restrictive.
Lapidus, Garry; Borrup, Kevin; DiVietro, Susan; Campbell, Brendan T; Beebe, Rebecca; Grasso, Damion; Rogers, Steven; Joseph, D'Andrea; Banco, Leonard
2016-04-01
The mission of the Connecticut Injury Prevention Center (CIPC), jointly housed in Connecticut Children's Medical Center and Hartford Hospital, is to reduce unintentional injury and violence among Connecticut residents, with a special focus on translating research into injury prevention programmes and policy. The CIPC engages in four core activities: research, education and training, community outreach programmes and public policy. As surveillance is an essential element of injury prevention, the CIPC has developed a robust statewide fatal and non-fatal injury surveillance system that has guided our prior work and continues to inform our current projects. The purpose of this article is to review the projects, programmes, and collaborative relationships that have made the CIPC successful in reducing unintentional injury and violence in Connecticut throughout the course of its 25 years history. Retrospective review of the application of injury surveillance. We believe that the application of our surveillance system can serve as a model for others who wish to engage in collaborative, community-based, data-driven injury prevention programmes in their own communities. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/
76 FR 35978 - Drawbridge Operation Regulations; Connecticut River, Old Lyme, CT
2011-06-21
... Operation Regulations; Connecticut River, Old Lyme, CT AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... Connecticut River at Old Lyme, Connecticut. The deviation is necessary to facilitate scheduled maintenance at... the Connecticut River at mile 3.4, at Old Lyme, Connecticut, has a vertical clearance in the closed...
Spent Nuclear Fuel project, project management plan
International Nuclear Information System (INIS)
Fuquay, B.J.
1995-01-01
The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project
Quality Assurance Project Plan for Citizen Science Projects
The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.
Project Management Plan Solution Stabilization
International Nuclear Information System (INIS)
SATO, P.K.
1999-01-01
This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process
Project Management Plan Solution Stabilization
Energy Technology Data Exchange (ETDEWEB)
SATO, P.K.
1999-08-31
This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.
Project planning and project management of Baseball II-T
International Nuclear Information System (INIS)
Kozman, T.A.; Chargin, A.K.
1975-01-01
The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed
Project structure plan requirements for the deconstruction projects
International Nuclear Information System (INIS)
Petrasch, Peter; Schmitt, Christian; Stapf, Meike
2011-01-01
The deconstruction of nuclear facilities requires due to the particular conditions and the size of the project a special project planning. The authors analyze the possible requirements to be fulfilled by a project structure plan for nuclear facilities, including personnel resources, organization structure, budget questions, operation and project oriented measures, possibility of modifications and supplements. Further topics include controlling and project realization procedures, documentation, third party activities (authorities, consultants, surveyors), logistics and transport, and radiation protection issues. Several questions remain for plants-specific planning, including the integration of the plant personnel, administrative work, project management, economic and financial issues, radioactive waste management issues.
Kilgard, Roy E.; Williams, Amrys; Erickson, Paul; Herbst, William; Redfield, Seth
2017-01-01
Under Connecticut Skies examines the history of astronomy at Van Vleck Observatory, located on the campus of Wesleyan University in Middletown, Connecticut. Since its dedication in June of 1916, Van Vleck has been an important site of astronomical research, teaching, and public outreach. Over a thousand visitors pass through the observatory each year, and regular public observing nights happen year-round in cooperation with the Astronomical Society of Greater Hartford. Our project explores the place-based nature of astronomical research, the scientific instruments, labor, and individuals that have connected places around the world in networks of observation, and the broader history of how observational astronomy has linked local people, amateur observers, professional astronomers, and the tools and objects that have facilitated their work under Connecticut’s skies over the past 100 years. Our research team has produced a historical exhibition to help commemorate the observatory’s centennial that opened to the public in May of 2016. Our work included collecting, documenting, and interpretting this history through objects, archival documents, oral histories, photographs, and more. The result is both a museum and a working history "laboratory" for use by student and professional researchers. In addition to the exhibit itself, we have engaged in new interpretive programs to help bring the history of astronomy to life. Future work will include digitization of documents and teaching slides, further collection of oral histories, and expanding the collection to the web for use by off-site researches.
Planning for high performance project teams
International Nuclear Information System (INIS)
Reed, W.; Keeney, J.; Westney, R.
1997-01-01
Both industry-wide research and corporate benchmarking studies confirm the significant savings in cost and time that result from early planning of a project. Amoco's Team Planning Workshop combines long-term strategic project planning and short-term tactical planning with team building to provide the basis for high performing project teams, better project planning, and effective implementation of the Amoco Common Process for managing projects
Why does project planning fail
International Nuclear Information System (INIS)
Foley, M.; Luciano, G.
1991-01-01
The technology of project controls have become increasingly sophisticated. Some say that the technological advancements of the Nineteen-Eighties represented a maturation of project control tools. Others say that the advancements were merely bells and whistles that added little or nothing to the project management process. Above it all, as we enter the Nineties, there is a popular outcry to get back to the basics of planning. The genesis of this outcry is the sobering impact of significant cost overruns and schedule extensions, even on projects that have employed the most advanced project control tools and systems. This paper examines the merits of taking a strategic approach to the project planning process. Within that context, there are basic goals of planning which are enduring through the life cycle of the project. Key reasons for failure and inability to achieve the goals of project planning are explained. By examining the goals of project planning and the reasons for failure, insight is provided into the role of project controls specialists and sophisticated project control tools in meeting the challenges of complex project management in the 1990's
Energy Technology Data Exchange (ETDEWEB)
Strategic Priorities and Impact Analysis Team, Office of Strategic Programs
2017-11-01
This fact sheet "New Haven, Connecticut: Targeting Low-Income Household Energy Savings" explains how the City of New Haven used data from the U.S. Department of Energy's Cities Leading through Energy Analysis and Planning (Cities-LEAP) and the State and Local Energy Data (SLED) programs to inform its city energy planning. It is one of ten fact sheets in the "City Energy: From Data to Decisions" series.
77 FR 68798 - Connecticut; Emergency and Related Determinations
2012-11-16
... determined that the emergency conditions in the State of Connecticut resulting from Hurricane Sandy beginning... State of Connecticut have been designated as adversely affected by this declared emergency: All counties... Assistance (DUA); 97.046, Fire Management Assistance Grant; 97.048, Disaster Housing Assistance to...
76 FR 61373 - Connecticut; Emergency and Related Determinations
2011-10-04
... determined that the emergency conditions in the State of Connecticut resulting from Hurricane Irene beginning... designated as adversely affected by this declared emergency: All eight counties in the State of Connecticut... Management Assistance Grant; 97.048, Disaster Housing Assistance to Individuals and Households In...
Babesia microti, human babesiosis, and Borrelia burgdorferi in Connecticut.
Anderson, J F; Mintz, E D; Gadbaw, J J; Magnarelli, L A
1991-01-01
Babesia microti was isolated from a white-footed mouse (Peromyscus leucopus) that was captured in southeastern Connecticut in 1988, when the first human case of babesiosis acquired in Connecticut was recognized. To date, 13 cases of babesiosis have been reported in Connecticut, the largest number of human cases reported on the mainland United States. Two of nine patients quiried remembered a prior tick bite. Since Babesia parasites are known to be vectored only by ticks, we surmise that 12 of...
PACTEL OECD project planning (PACO). PACTEL OECD project planning
Energy Technology Data Exchange (ETDEWEB)
Kouhia, V.; Purhonen, H. [Lappeenranta University of Technology (Finland)
2004-07-01
OECD launched the SETH project to investigate issues relevant for accident prevention and management and to ensure the existence of integral thermal hydraulic test facilities. The facilities included in the SETH project are PKL from Germany and PANDA from Switzerland. At the early stages of the SETH project an idea was raised to exploit the PACTEL facility in a similar OECD project. Without any external funding the analytical work in the required extent would not be possible within Lappeenranta University of Technology, the party responsible of operating PACTEL. This fact directed the PACO project proposal to be conducted for the SAFIR programme. The aim of the PACO project is to prepare a project proposal to OECD of a PACTEL related project. To attain this objective some preliminary analyses have to be performed to ensure the relevancy of the proposed topic. The low power situation, i.e. midloop state was chosen to be the topic in the PACO studies and project planning basis. The plan is to use PACTEL to examine vertical steam generator behaviour during the midloop operation and the following loss of residual heat removal system transient. Such a possibility is acknowledged with special alterations to PACTEL. The APROS code version 5.04.07 was selected as a tool for the preanalyses. The virtual simulation of the chosen experimental situation would give a preconception on the phenomena to be expected and the progression of the transient. Originally the PACO project was planned to continue only for a few months, ending up with the project proposal to OECD during the summer time 2004. During the pre-calculation process it became obvious that the time expected was not enough to establish good pre-calculation results. The reasons for this relates to time used to learn and adapt the use of the chosen code, improvements and corrections in modelling as well as the code ability to manage the special conditions defined for the project topic. Another aspect on completing a
77 FR 6465 - Drawbridge Operation Regulations; Connecticut River, Old Lyme, CT
2012-02-08
... Operation Regulations; Connecticut River, Old Lyme, CT AGENCY: Coast Guard, DHS. ACTION: Notice of temporary... deviation from the regulation governing the operation of the Old Saybrook-Old Lyme RR Bridge, mile 3.4, across the Connecticut River at Old Lyme, Connecticut. The deviation is necessary to facilitate bridge...
Aleman, Nancy M.; Landers, Patricia A.; Parkman, Gary W.
2002-01-01
This article shows how in Connecticut, making a solid connection with the state Department of Education has helped lead to well-developed, state-supported school counseling documents. Discusses how the latest efforts have resulted in two publications based on the National Standards for School Counseling Programs. (GCP)
Association Between Connecticut's Permit-to-Purchase Handgun Law and Homicides.
Rudolph, Kara E; Stuart, Elizabeth A; Vernick, Jon S; Webster, Daniel W
2015-08-01
We sought to estimate the effect of Connecticut's implementation of a handgun permit-to-purchase law in October 1995 on subsequent homicides. Using the synthetic control method, we compared Connecticut's homicide rates after the law's implementation to rates we would have expected had the law not been implemented. To estimate the counterfactual, we used longitudinal data from a weighted combination of comparison states identified based on the ability of their prelaw homicide trends and covariates to predict prelaw homicide trends in Connecticut. We estimated that the law was associated with a 40% reduction in Connecticut's firearm homicide rates during the first 10 years that the law was in place. By contrast, there was no evidence for a reduction in nonfirearm homicides. Consistent with prior research, this study demonstrated that Connecticut's handgun permit-to-purchase law was associated with a subsequent reduction in homicide rates. As would be expected if the law drove the reduction, the policy's effects were only evident for homicides committed with firearms.
2011-10-07
..., Attorney General of the Commonwealth of Massachusetts, Connecticut Public Utilities Regulatory Authority... Martha Coakley, Attorney General of the Commonwealth of Massachusetts, Connecticut Public Utilities..., George Jepsen, Attorney General of the State of Connecticut, Connecticut Office of Consumer Counsel...
Risks management in project planning
Stankevičiūtė, Roberta
2017-01-01
Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...
Selection of candidate sites for a LLRW disposal facility in Connecticut
International Nuclear Information System (INIS)
Gingerich, Ronald E.; Holeman, George R.; Hileman, James A.
1992-01-01
Connecticut, one of the two members of the Northeast Interstate Low-Level Radioactive Waste Management Compact, has been directed by the Compact Commission to site a facility to manage the low-level radioactive waste (LLRW) generated in Connecticut. The Connecticut Hazardous Waste Management Service (CHWMS) has been given the responsibility to identify a site in the state for a LLRW disposal facility. The CHWMS has decided to plan for a site with an operating life of 50 years. A site of at least 160 acres will be needed to accommodate (he expected volume of LLRW and meet state and federal site requirements. A Site Selection Plan establishing the process and criteria to be used in siting a facility was adopted by the CHWMS in November 1990. The Plan calls for a stepwise screening of the state using published data to identify three candidate sites. A preferred site will be selected from among the candidate sites using onsite testing. The site selection criteria, which closely follow state and federal statutory and regulatory requirements, are divided into three types: exclusionary, avoidance and preference. Battelle Memorial Institute was selected as the contractor to assist the CHWMS in site screening. With guidance from the CHWMS, Battelle undertook screening of the state by applying the exclusionary, avoidance and preference criteria in three steps to identify from eight to twelve potential sites. The CHWMS Board of Directors bad decided that it wanted to be closely involved in the selection of the three candidate sites and to do so in a way that precluded the political and parochial pressures that are inevitably associated with a siting process. To meet these two goals a geographically neutral approach was devised for candidate site selection. In June, 1991 the CHWMS, with assistance from Battelle, conducted a three day workshop, open to the public, in which eight sites were presented to the Board. Data on the sites were presented in a way that did not disclose
IX Disposition Project - project management plan
International Nuclear Information System (INIS)
Choi, I.G.
1994-01-01
This report presents plans for resolving saving and disposal concerns for ion exchange modules, cartridge filters and columns. This plan also documents the project baselines for schedules, cost, and technical information
State write-ups on EERE funded projects
Energy Technology Data Exchange (ETDEWEB)
Hurwitch, J.; Klareich, F.; Surek, D.
1997-03-04
Short summaries are presented on 43 projects funded under the hydrogen program in FY 1997 in California, Colorado, Connecticut, the District of Columbia, Florida, Hawaii, Maryland, Massachusetts, Michigan, New Jersey, New Mexico, New York, Oklahoma, Pennsylvania, South Carolina, Tennessee, and Virginia. The studies involve hydrogen production processes, hydrogen storage and delivery systems, environmental impacts, hydrogen fuel cells, information dissemination, marketing research, separation processes, transportation safety, materials corrosion and stability, hydrogen recovery at refineries, and infrastructure planning.
Project implementation plan: ASTD remote deployment
International Nuclear Information System (INIS)
CRASS, D.W.
1999-01-01
This document is the project implementation plan for the ASTD Remote Deployment Project. The Plan identifies the roles and responsibilities for the project and defines the integration between the ASTD Project and the B-Cell Cleanout Project
Geological-Seismological Evaluation of Earthquake Hazards at West Thompson Damsite, Connecticut.
1984-06-01
Connecticut, N of 41.61N 72.12W 1.5 - Norwich ( Foreshock ) 29 Jun 80 Connecticut, N of 41.46N 72.09W 1.8 - Norwich 28 Jul 80 Connecticut, N of 41.52N...the event was judged to be either an aftershock or foreshock ; the geographic location is given as north latitude and west longitude, to the nearest 0.10
Next Generation Nuclear Plant Project Preliminary Project Management Plan
International Nuclear Information System (INIS)
Dennis J. Harrell
2006-01-01
This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This
The role of project planning in project management
Klitsenko, A. I.; Клиценко, А. И.
2013-01-01
This article describes the importance of the process of project planning. The author gives irrefutable arguments concerning crucial role of project planning. This article presents the definition, objects and the main goal of project planning. The purpose of this article is to review such objects of project planning as project scope, risk and human resources. Данная статья описывает важность процесса проектного планирования. Автор дает неопровержимые доводы, касающиеся решающей роли проектн...
Project Management Plan for Material Stabilization
International Nuclear Information System (INIS)
SPEER, D.R.
1999-01-01
This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617/Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides
Project Execution Plan, Rev. 3
International Nuclear Information System (INIS)
IT Corporation, Las Vegas
2002-01-01
This plan addresses project activities encompassed by the U.S. Department of Energy's (DOE's), National Nuclear Security Administration Nevada Operations Office, Environmental Restoration Division and conforms to the requirements contained in the Life-Cycle Asset Management, DOE Order 430.1A; The Joint Program Office Policy on Project Management in Support of DOE Order 430.1; Program and Project Management for the Acquisition of Capital Assets, DOE Order 413.3; the Project Execution and Engineering Management Planning Guide, GPG-FM-010; and other applicable Good Practice Guides; and the FY 2001 Integrated Planning, Accountability, and Budgeting System Policy Guidance. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense; and traditional project management philosophies such as the development of life-cycle costs, schedules, and work scope; identification o f roles and responsibilities; and baseline management and controls
Project plan remove special nuclear material from PFP project plutonium finishing plant
International Nuclear Information System (INIS)
BARTLETT, W.D.
1999-01-01
This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process
Project Surveillance and Maintenance Plan
International Nuclear Information System (INIS)
1985-09-01
The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the [guidance] to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs
33 CFR 385.24 - Project Management Plans.
2010-07-01
... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...
Connecticut – Sexual Orientation and Gender Identity Law and Documentation of Discrimination
Sears, Brad
2009-01-01
A Connecticut statute bans employment discrimination on the basis of sexual orientation. No Connecticut statutes prohibit discrimination on the basis of gender identity or expression. In November 2000, the Connecticut Commission on Human Rights and Opportunities – the agency responsible for administering the anti-discrimination statutes and for processing discrimination complaints – ruled that statutes prohibiting sex discrimination also banned discrimination on the basis of gender identity. ...
Project Specific Quality Assurance Plan
International Nuclear Information System (INIS)
Pedersen, K.S.
1995-01-01
This Quality Assurance Project Plan (QAPP) identifies the Westinghouse Hanford Co. (WHC) Quality Assurance (QA) program requirements for all contractors involved in the planning and execution of the design, construction, testing and inspection of the 200 Area Effluent BAT/AKART Implementation, Project W-291
International Nuclear Information System (INIS)
1988-01-01
The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the ''Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs
UMTRA Project: Environment, Safety, and Health Plan
International Nuclear Information System (INIS)
1995-02-01
The US Department of Energy has prepared this UMTRA Project Environment, Safety, and Health (ES and H) Plan to establish the policy, implementing requirements, and guidance for the UMTRA Project. The requirements and guidance identified in this plan are designed to provide technical direction to UMTRA Project contractors to assist in the development and implementation of their ES and H plans and programs for UMTRA Project work activities. Specific requirements set forth in this UMTRA Project ES and H Plan are intended to provide uniformity to the UMTRA Project's ES and H programs for processing sites, disposal sites, and vicinity properties. In all cases, this UMTRA Project ES and H Plan is intended to be consistent with applicable standards and regulations and to provide guidance that is generic in nature and will allow for contractors' evaluation of site or contract-specific ES and H conditions. This plan specifies the basic ES and H requirements applicable to UMTRA Project ES and H programs and delineates responsibilities for carrying out this plan. DOE and contractor ES and H personnel are expected to exercise professional judgment and apply a graded approach when interpreting these guidelines, based on the risk of operations
Residential Energy Efficiency Potential: Connecticut
Energy Technology Data Exchange (ETDEWEB)
Wilson, Eric J [National Renewable Energy Laboratory (NREL), Golden, CO (United States)
2017-11-16
Energy used by Connecticut single-family homes that can be saved through cost-effective improvements. Prepared by Eric Wilson and Noel Merket, NREL, and Erin Boyd, U.S. Department of Energy Office of Energy Policy and Systems Analysis.
SNF project engineering process improvement plan
International Nuclear Information System (INIS)
KELMENSON, R.L.
1999-01-01
This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project (the Project) to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819 (1819). These requirements are imposed on all engineering activities performed for the Project and apply to all life-cycle stages of the Project's systems, structures and components (SSCs). This Plan describes the steps that will be taken by the Project during the transition period to ensure that new procedures are effectively integrated into the Project's work process as these procedures are issued. The consolidated procedures will be issued and implemented by September 30, 1999
Project plan remove special nuclear material from PFP project plutonium finishing plant; TOPICAL
International Nuclear Information System (INIS)
BARTLETT, W.D.
1999-01-01
This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617,Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process
The State of Connecticut: The Report of the Governor's Commission on Tax Reform. Summary.
Governor's Commission on Tax Reform, Hartford, CT.
The Commission evaluated a wide variety of alternative tax sources and examined the existing structure in Connecticut. It specifically evaluated inequities resulting from Connecticut taxes as they affect various classes of citizens and examined the impact of the Connecticut tax structure on business with a view to encouraging economic expansion.…
National Oceanic and Atmospheric Administration, Department of Commerce — Project: NOAA Digital Orthophotography and Ancillary Oblique Imagery Collection for the Coasts of Main/New Hampshire, Massachusetts/Rhode Island/Connecticut, and...
Connecticut's forest resources, 2010
Brett J. Butler; Cassandra Kurtz; Christopher Martin; W. Keith Moser
2011-01-01
This publication provides an overview of forest resource attributes for Connecticut based on an annual inventory conducted by the Forest Inventory and Analysis (FIA) program at the Northern Research Station of the U.S. Forest Service. These estimates, along with web-posted core tables, will be updated annually. For more information please refer to page 4 of this report...
Connecticut's forest resources, 2009
Brett J. Butler; Christopher Martin
2011-01-01
This publication provides an overview of forest resource attributes for Connecticut based on an annual inventory conducted by the Forest Inventory and Analysis (FIA) program at the Northern Research Station of the U.S. Forest Service. These estimates, along with web-posted core tables, will be updated annually. For more information please refer to page 4 of this report...
Brett J. Butler
2016-01-01
This report provides an overview of forest resources in Connecticut based on an inventory conducted by the U.S. Forest Service, Forest Inventory and Analysis (FIA) program of the Northern Research Station. Estimates are based on field data collected using the FIA annualized sample design. Results are for the measurement years 2010-2015 with comparisons made to 2005-...
Planning and Managing Drupal Projects
Nordin, Dani
2011-01-01
If you're a solo website designer or part of a small team itching to build interesting projects with Drupal, this concise guide will get you started. Drupal's learning curve has thrown off many experienced designers, particularly the way it handles design challenges. This book shows you the lifecycle of a typical Drupal project, with emphasis on the early stages of site planning. Learn how to efficiently estimate and set up your own project, so you can focus on ways to make your vision a reality, rather than let project management details constantly distract you. Plan and estimate your projec
Research Planning and Evaluation Project
International Nuclear Information System (INIS)
Song, Seunghyun; Kim, Doyang; Ryu, Byunghoon; Lim, Chaeyoung; Song, Leeyoung; Lee, Youngchul; Han, Changsun; Kim, Hackchoon
2011-12-01
- To activate R and D through a systematic and impartial evaluation by using information on efficient distribution of research resource, setting project priorities, and measuring achievement against goals produced after research on planning and evaluation system for the government-funded project for KAERI was conducted. - Nuclear R and D project is the representative national R and D project which has been implemented in Korea. For the sustainable development of nuclear energy which supplies about 40% of total electricity generation and the enhancement of it innovative ability in the future, a systematic and efficient strategy in the planning stage is required
Project Execution Plan,Rev. 3; FINAL
International Nuclear Information System (INIS)
IT Corporation, Las Vegas
2002-01-01
This plan addresses project activities encompassed by the U.S. Department of Energy's (DOE's), National Nuclear Security Administration Nevada Operations Office, Environmental Restoration Division and conforms to the requirements contained in the Life-Cycle Asset Management, DOE Order 430.1A; The Joint Program Office Policy on Project Management in Support of DOE Order 430.1; Program and Project Management for the Acquisition of Capital Assets, DOE Order 413.3; the Project Execution and Engineering Management Planning Guide, GPG-FM-010; and other applicable Good Practice Guides; and the FY 2001 Integrated Planning, Accountability, and Budgeting System Policy Guidance. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense; and traditional project management philosophies such as the development of life-cycle costs, schedules, and work scope; identification o f roles and responsibilities; and baseline management and controls
A Science Framework for Connecticut River Watershed Sustainability
Rideout, Stephen; Nicolson, Craig; Russell-Robinson, Susan L.; Mecray, Ellen L.
2005-01-01
Introduction: This document outlines a research framework for water resource managers and land-use planners in the four-state Connecticut River Watershed (CRW). It specifically focuses on developing the decision-support tools and data needed by managers in the watershed. The purpose of the Science Framework is to identify critical research issues and information required to better equip managers to make decisions on desirable changes in the CRW. This Science Framework is the result of a cooperative project between the U.S. Geological Survey (USGS), the University of Massachusetts at Amherst (UMass-Amherst), and the U.S. Fish and Wildlife Service (FWS). The cooperative project was guided by a Science Steering Committee (SC) and included several focus groups, a 70-person workshop in September 2004, and an open collaborative process by which the workshop outcomes were synthesized, written up, and then progressively refined through peer review. This document is the product of that collaborative process.
33 CFR 100.102 - Great Connecticut River Raft Race, Middletown, CT.
2010-07-01
... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Great Connecticut River Raft Race, Middletown, CT. 100.102 Section 100.102 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND... Raft Race, Middletown, CT. (a) Regulated Area. That section of the Connecticut River between Dart...
SNF Project Engineering Process Improvement Plan
International Nuclear Information System (INIS)
DESAI, S.P.
2000-01-01
This plan documents the SNF Project activities and plans to support its engineering process. It describes five SNF Project Engineering initiatives: new engineering procedures, qualification cards process; configuration management, engineering self assessments, and integrated schedule for engineering activities
14 CFR 152.109 - Project eligibility: Airport planning.
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Project eligibility: Airport planning. 152....109 Project eligibility: Airport planning. (a) Airport master planning. A proposed project for airport master planning is not approved unless— (1) The location of the existing or proposed airport is included...
Route planning algorithms: Planific@ Project
Directory of Open Access Journals (Sweden)
Gonzalo Martín Ortega
2009-12-01
Full Text Available Planific@ is a route planning project for the city of Madrid (Spain. Its main aim is to develop an intelligence system capable of routing people from one place in the city to any other using the public transport. In order to do this, it is necessary to take into account such things as: time, traffic, user preferences, etc. Before beginning to design the project is necessary to make a comprehensive study of the variety of main known route planning algorithms suitable to be used in this project.
Applying transportation asset management in Connecticut.
2008-12-01
The study consists primarily of a detailed review of those states that utilize transportation asset management (TAM) systems that may be applicable for Connecticuts consideration, and includes as well the identification of a comprehensive pavement...
Licensing plan for UMTRA project disposal sites
International Nuclear Information System (INIS)
1993-09-01
The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC's acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information
Spent Nuclear Fuel Project Safety Management Plan
International Nuclear Information System (INIS)
Garvin, L.J.
1996-02-01
The Spent Nuclear Fuel Project Safety Management Plan describes the new nuclear facility regulatory requirements basis for the Spemt Nuclear Fuel (SNF) Project and establishes the plan to achieve compliance with this basis at the new SNF Project facilities
AVLIS Production Plant Project Management Plan
International Nuclear Information System (INIS)
1984-01-01
The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables
Directory of Open Access Journals (Sweden)
Tom Savoy
Full Text Available Atlantic Sturgeon is listed under the U.S. Endangered Species Act as five Distinct Population Segments (DPS. The "endangered" New York Bight (NYB DPS is thought to only harbor two populations; one in the Hudson River and a second smaller one in the Delaware River. Historically, the Connecticut River probably supported a spawning population of Atlantic Sturgeon that was believed extirpated many decades ago. In 2014, we successfully collected pre-migratory juvenile specimens from the lower Connecticut River which were subjected to mitochondrial DNA (mtDNA control region sequence and microsatellite analyses to determine their genetic relatedness to other populations coastwide. Haplotype and allelic frequencies differed significantly between the Connecticut River collection and all other populations coastwide. Sibship analyses of the microsatellite data indicated that the Connecticut River collection was comprised of a small number of families that were likely the offspring of a limited number of breeders. This was supported by analysis of effective population size (Ne and number of breeders (Nb. STRUCTURE analysis suggested that there were 11 genetic clusters among the coastwide collections and that from the Connecticut River was distinct from those in all other rivers. This was supported by UPGMA analyses of the microsatellite data. In AMOVA analyses, among region variation was maximized, and among population within regions variation minimized when the Connecticut River collection was separate from the other two populations in the NYB DPS indicating the dissimilarity between the Connecticut River collection and the other two populations in the NYB DPS. Use of mixed stock analysis indicated that the Connecticut River juvenile collection was comprised of specimens primarily of South Atlantic and Chesapeake Bay DPS origins. The most parsimonious explanation for these results is that the Connecticut River hosted successful natural reproduction in 2013
78 FR 54949 - Major Project Financial Plan Guidance
2013-09-06
...'' (GA-090-751). That report recommended that Financial Plans include the cost of financing the project... Project Financial Plan Guidance AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice; Request for comments. SUMMARY: This notice requests comments on draft Major Project Financial Plan...
Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities
International Nuclear Information System (INIS)
Nickels, J.M.
1991-06-01
This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs
Planning Complex Projects Automatically
Henke, Andrea L.; Stottler, Richard H.; Maher, Timothy P.
1995-01-01
Automated Manifest Planner (AMP) computer program applies combination of artificial-intelligence techniques to assist both expert and novice planners, reducing planning time by orders of magnitude. Gives planners flexibility to modify plans and constraints easily, without need for programming expertise. Developed specifically for planning space shuttle missions 5 to 10 years ahead, with modifications, applicable in general to planning other complex projects requiring scheduling of activities depending on other activities and/or timely allocation of resources. Adaptable to variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction.
Cost-Effectiveness Analysis of the Residential Provisions of the 2015 IECC for Connecticut
Energy Technology Data Exchange (ETDEWEB)
Mendon, Vrushali V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Zhao, Mingjie [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Taylor, Zachary T. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Poehlman, Eric A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)
2016-02-15
The 2015 IECC provides cost-effective savings for residential buildings in Connecticut. Moving to the 2015 IECC from the 2009 IECC base code is cost-effective for residential buildings in all climate zones in Connecticut.
Salt Repository Project. FY-84 technical project plan
International Nuclear Information System (INIS)
1984-08-01
The FY 84 technical plans for the Salt Repository Project (SRP) are briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management (CRWM) program are discused and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 Work Breakdown Structure Tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Test Facilities, Exploratory Shaft, Land Acquisition, and Program Management) in an appendix. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. Milestones and their definitions for the plan year, as well as milestones for the outyears are also presented at this same subtask level for each subtask
International Nuclear Information System (INIS)
2001-01-01
The Waste Isolation Pilot Plant's (WIPP) Recertification Project was established to meet the requirement placed in the WIPP Land Withdrawal Act (LWA) to demonstrate WIPP's continued compliance with the Environmental Protection Agency's (EPA) disposal regulations at five-year intervals. This plan delineates the end goal of the effort, sets out interim goals, and offers up guiding assumptions. In general, it sets the overall direction for a highly complex and interdependent set of tasks leading to recertification of the repository in the spring of 2004. In addition, this plan establishes the institutional roles and responsibilities of WIPP project participants in the recertification effort and lays out a high-level schedule for producing the Compliance Recertification Application (CRA). Detailed plans from each organization supporting this project have been included with this document as attachments. Each participant plan provides significantly more detail with descriptions of activities that are designed to ensure a successful outcome. Woven throughout this plan are the elements of guidance and direction gained from technical exchanges with EPA managers and staff. An important principle on which this plan is built is that the process of recertification will not involve modification to the certification baseline, nor will it involve rule making of any kind. Only changes previously approved by the EPA will be detailed in the CRA. EPA-approved changes to the WIPP certification will be accepted through modification or will be approved through the annual change reporting process. For any compliance areas that have not changed since the submission of the Compliance Certification Application(CCA), these will merely be incorporated in the CRA by reference. The CRA will cover all information since the October 1996 submittal of the CCA. A second major principle on which this plan is built stems from the EPA WIPP Recertification Guidance. That guidance makes it clear that, if
Single-shell tank interim stabilization project plan
Energy Technology Data Exchange (ETDEWEB)
Ross, W.E.
1998-05-11
This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.
Project Plan For Remove Special Nuclear Material (SNM) from Plutonium Finishing Plant (PFP) Project
International Nuclear Information System (INIS)
BARTLETT, W.D.
1999-01-01
This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove SNM Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617. This project plan is the top-level definitive project management document for the PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baseline to manage the execution of the Remove SNM Materials project. Any deviation to the document must be authorized through the appropriate change control process. The Remove SNM Materials project provides the necessary support and controls required for DOE-HQ, DOE-RL, BWHC, and other DOE Complex Contractors the path forward to negotiate shipped/receiver agreements, schedule shipments, and transfer material out of PFP to enable final deactivation
Salt Repository Project: FY 85 technical project plan
International Nuclear Information System (INIS)
1985-07-01
The FY 85 technical plan for the Salt Repository Project is briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management Program are discussed, and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 work breakdown structure tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Exploratory Shaft, Test Facilities, Land Acquisition, and Project Management) in the various sections. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. A strategy diagram and a master schedule are included and each of the milestones is also listed chronologically in the sections
Project Hanford management contract quality improvement project management plan; TOPICAL
International Nuclear Information System (INIS)
ADAMS, D.E.
1999-01-01
On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process
25 CFR 170.415 - What is pre-project planning?
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false What is pre-project planning? 170.415 Section 170.415... PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Long-Range Transportation Planning § 170.415 What is pre-project planning? (a) Pre-project planning is part of overall...
2010-10-01
... refuge each day (see §§ 27.93 and 27.94 of this chapter). B. Upland Game Hunting. [Reserved] C. Big Game... NATIONAL WILDLIFE REFUGE SYSTEM HUNTING AND FISHING Refuge-Specific Regulations for Hunting and Fishing § 32.26 Connecticut. The following refuge units have been opened for hunting and/or fishing and are...
Non-Profit/Higher Education Project Management Series: The Project Plan
Burgher, Karl E.; Snyder, Michael
2012-01-01
This is the second installment of the AACRAO management series focusing on project management in the academy. In this article, the authors focus on white papers (often called charters, briefs, or fact sheets) and their partner, the work plan. The work plan is a detailed document that defines each aspect of a project. It is often preceded by a…
Uranium Mill Tailings Remedial Action Project surface project management plan
International Nuclear Information System (INIS)
1994-09-01
This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials
International Nuclear Information System (INIS)
Parazin, R.J.
1998-01-01
This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented
Babesia microti, human babesiosis, and Borrelia burgdorferi in Connecticut.
Anderson, J F; Mintz, E D; Gadbaw, J J; Magnarelli, L A
1991-12-01
Babesia microti was isolated from a white-footed mouse (Peromyscus leucopus) that was captured in southeastern Connecticut in 1988, when the first human case of babesiosis acquired in Connecticut was recognized. To date, 13 cases of babesiosis have been reported in Connecticut, the largest number of human cases reported on the mainland United States. Two of nine patients quiried remembered a prior tick bite. Since Babesia parasites are known to be vectored only by ticks, we surmise that 12 of these infections were acquired via tick bites; 1 was obtained by blood transfusion (the patient was 46 years of age) from an endemically infected donor. The ages of the patients with tick-acquired babesiosis ranged from 61 to 95 years. Two patients died with active infections, and one patient died from chronic obstructive pulmonary disease soon after treatment with clindamycin and quinine. Indirect fluorescent-antibody titers of blood samples drawn at the time of hospitalization for 11 patients and at the time of active infection for 1 asymptomatic person ranged from 1:1,024 to 1:4,096. Five of eight patients with babesiosis also had significant immunoglobulin G or immunoglobulin M titers (1:640 to 1:5,120) to Borrelia burgdorferi. B. microti was isolated in Syrian hamsters inoculated with blood from 7 of 12 patients tested and was also isolated from mice captured in six towns. The peridomestic nature of the disease was demonstrated by isolating the parasite from white-footed mice captured in or near the yards of eight different patients. Of 59 mice tested, 27 were positive and 25 were coinfected with B. burgdorferi. The isolation of B. microti from a white-footed mouse captured in north-central Connecticut (West Hartford), away from the focus of human infections in southeastern Connecticut, suggests that this pathogen may spread into other areas where Ixodes dammini, the tick vector, becomes established.
Dynamics of Connecticut hemlock stands
Jeffrey S. Ward; David M. Smith
2000-01-01
The stand dynamics and production of two one-acre plots of eastern hemlock (Tsuga canadensis L) in Connecticut have been followed for more than six decades. Data were recorded for all individual trees. One plot (Saltonstall) was established in 1924 after the removal of a hardwood overstory. This stand had a nearly pure, almost fully closed understory...
49 CFR 633.25 - Contents of a project management plan.
2010-10-01
... 49 Transportation 7 2010-10-01 2010-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...
49 CFR 633.27 - Implementation of a project management plan.
2010-10-01
... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...
Policy and planning for large infrastructure projects
DEFF Research Database (Denmark)
Flyvbjerg, Bent
2005-01-01
This paper focuses on problems and their causes and cures in policy and planning for large infrastructure projects. First, it identifies as the main problem in major infrastructure development pervasive misinformation about the costs, benefits, and risks involved. A consequence of misinformation ...... for large infrastructure projects, with a focus on better planning methods and changed governance structures, the latter being more important.......This paper focuses on problems and their causes and cures in policy and planning for large infrastructure projects. First, it identifies as the main problem in major infrastructure development pervasive misinformation about the costs, benefits, and risks involved. A consequence of misinformation...... the likelihood that it is their projects, and not the competition's, that gain approval and funding. This results in the "survival of the unfittest," where often it is not the best projects that are built, but the most misrepresented ones. Finally, the paper presents measures for reforming policy and planning...
Energy Technology Data Exchange (ETDEWEB)
Broadbridge, Christine C. [Southern Connecticut State University
2013-03-28
DOE grant used for partial fulfillment of necessary laboratory equipment for course enrichment and new graduate programs in nanotechnology at the four institutions of the Connecticut State University System (CSUS). Equipment in this initial phase included variable pressure scanning electron microscope with energy dispersive x-ray spectroscopy elemental analysis capability [at Southern Connecticut State University]; power x-ray diffractometer [at Central Connecticut State University]; a spectrophotometer and spectrofluorimeter [at Eastern Connecticut State University; and a Raman Spectrometer [at Western Connecticut State University]. DOE's funding was allocated for purchase and installation of this scientific equipment and instrumentation. Subsequently, DOE funding was allocated to fund the curriculum, faculty development and travel necessary to continue development and implementation of the System's Graduate Certificate in Nanotechnology (GCNT) program and the ConnSCU Nanotechnology Center (ConnSCU-NC) at Southern Connecticut State University. All of the established outcomes have been successfully achieved. The courses and structure of the GCNT program have been determined and the program will be completely implemented in the fall of 2013. The instrumentation has been purchased, installed and has been utilized at each campus for the implementation of the nanotechnology courses, CSUS GCNT and the ConnSCU-NC. Additional outcomes for this grant include curriculum development for non-majors as well as faculty and student research.
Development of a statewide hospital plan for radiologic emergencies
International Nuclear Information System (INIS)
Dainiak, Nicholas; Delli Carpini, Domenico; Bohan, Michael; Werdmann, Michael; Wilds, Edward; Barlow, Agnus; Beck, Charles; Cheng, David; Daly, Nancy; Glazer, Peter; Mas, Peter; Nath, Ravinder; Piontek, Gregory; Price, Kenneth; Albanese, Joseph; Roberts, Kenneth; Salner, Andrew L.; Rockwell, Sara
2006-01-01
Although general guidelines have been developed for triage of victims in the field and for hospitals to plan for a radiologic event, specific information for clinicians and administrators is not available for guidance in efficient management of radiation victims during their early encounter in the hospital. A consensus document was developed by staff members of four Connecticut hospitals, two institutions of higher learning, and the State of Connecticut Department of Environmental Protection and Office of Emergency Preparedness, with assistance of the American Society for Therapeutic Radiology and Oncology. The objective was to write a practical manual for clinicians (including radiation oncologists, emergency room physicians, and nursing staff), hospital administrators, radiation safety officers, and other individuals knowledgeable in radiation monitoring that would be useful for evaluation and management of radiation injury. The rationale for and process by which the radiation response plan was developed and implemented in the State of Connecticut are reviewed. Hospital admission pathways are described, based on classification of victims as exposed, contaminated, and/or physically injured. This manual will be of value to those involved in planning the health care response to a radiologic event
Project Cost Estimation for Planning
2010-02-26
For Nevada Department of Transportation (NDOT), there are far too many projects that ultimately cost much more than initially planned. Because project nominations are linked to estimates of future funding and the analysis of system needs, the inaccur...
Dynamic and stochastic multi-project planning
Melchiors, Philipp
2015-01-01
This book deals with dynamic and stochastic methods for multi-project planning. Based on the idea of using queueing networks for the analysis of dynamic-stochastic multi-project environments this book addresses two problems: detailed scheduling of project activities, and integrated order acceptance and capacity planning. In an extensive simulation study, the book thoroughly investigates existing scheduling policies. To obtain optimal and near optimal scheduling policies new models and algorithms are proposed based on the theory of Markov decision processes and Approximate Dynamic programming.
Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project
Energy Technology Data Exchange (ETDEWEB)
David Duncan
2011-05-01
This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.
Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project
International Nuclear Information System (INIS)
Duncan, David
2011-01-01
This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.
Water resources inventory of Connecticut Part 10: Lower Connecticut River basin
Weiss, Lawrence A.; Bingham, James W.; Thomas, Mendall P.
1982-01-01
The lower Connecticut River basin study area in south-central Connecticut includes 639 square miles and is drained principally by the Connecticut River and by seven smaller streams that flow directly to Long Island Sound between the West River on the west and the Connecticut River on the east. The population in 1979 was estimated to be 210,380. Much of the industrial development and population centers are in the Mattabesset River basin in the northwestern part, and the largest water use is also in the Mattabesset River basin. Precipitation averages 47 inches per year and provides an abundant supply of water. About 20 inches returns to the atmosphere as evapotranspiration, and the remainder either flows directly to streams or percolates to the water table, eventually discharging to Long Island Sound. Small quantities of water are exported from the basin by the New Haven and Meridan Water Departments, and small quantities are imported by the New Britain Water Department and Metropolitan Direct Commission. Precipitation during 1931-60 resulted in an average annual runoff of 302 billion gallons. In inflow from the Connecticut River is added to the average annual runoff, the 4,370 billion gallon s per year is potentially available for water ue. The domestic, institutional, commercial, and industrial (other than cooling water) water use for 1970 was 7 billion gallons, which is only 3 percent of the total water used, whereas 97 percent of the total is cooling water for power plants. Approximately 60 percent of the 7 billion gallons is treated before being discharged back to the streams. The total amount of fresh water used during 1970 was estimated to be 256,000 million gallons (Mgal), of which 247,000 Mgal was used for cooling water at stream electric-generating plants. The quantity for domestic, commercial, industrial, and agricultural used was 9,000 Mgal, which was approximately 120 gallons a day per person. Public water systems providing 70 percent of these
Project Planning and Implementation: Lessons Learned From the AQBMP Project
National Research Council Canada - National Science Library
1997-01-01
...). This NSRP report is funded as an addendum to the Air Quality Best Management Practices (AQBMP) project (N1 -944). The AQBMP project was completed using an intensive project planning process using a variety of quality management tools...
Yakima fisheries project spring chinook supplementation monitoring plan
International Nuclear Information System (INIS)
Busack, C.; Pearsons, T.; Knudsen, C.; Phelps, S.; Watson, B.; Johnston, M.
1997-08-01
The Yakima Fisheries Project (YFP), a key element in the Northwest Power Planning Council's Fish and Wildlife Program, has been in planning for more than ten years. It was initially conceived as, and is still intended to be, a multipurpose project. Besides increasing fish production in the Yakima basin, it is also intended to yield information about supplementation that will be of value to the entire Columbia basin, and hopefully the entire region. Because of this expectation of increased knowledge resulting from the project, a large and comprehensive monitoring program has always been seen as an integral part of the project. Throughout 1996 the Monitoring Implementation and Planning Team (MIPT), an interdisciplinary group of biologists who have worked on the project for several years, worked to develop a comprehensive spring chinook monitoring plan for the project. The result is the present document
Tools for Supporting Distributed Agile Project Planning
Wang, Xin; Maurer, Frank; Morgan, Robert; Oliveira, Josyleuda
Agile project planning plays an important part in agile software development. In distributed settings, project planning is severely impacted by the lack of face-to-face communication and the inability to share paper index cards amongst all meeting participants. To address these issues, several distributed agile planning tools were developed. The tools vary in features, functions and running platforms. In this chapter, we first summarize the requirements for distributed agile planning. Then we give an overview on existing agile planning tools. We also evaluate existing tools based on tool requirements. Finally, we present some practical advices for both designers and users of distributed agile planning tools.
Linear-programming-based heuristics for project capacity planning
Gademann, A.J.R.M.; Schutten, J.M.J.
2005-01-01
Many multi-project organizations are capacity driven, which means that their operations are constrained by various scarce resources. An important planning aspect in a capacity driven multi-project organization is capacity planning. By capacity planning, we mean the problem of matching demand for
Groundwater/Vadose Zone Integration Project Management Plan
International Nuclear Information System (INIS)
Hughes, M. C.
1999-01-01
This Project Management Plan (PMP) defines the authorities, roles, and responsibilities of the US Department of Energy (DOE), Richland Operations Office (RL) and those contractor organizations participating in the Hanford Site' s Groundwater/Vadose Zone (GW/VZ) Integration Project. The PMP also describes the planning and control systems, business processes, and other management tools needed to properly and consistently conduct the Integration Project scope of work
Understanding Applications of Project Planning and Scheduling in Construction Projects
AlNasseri, Hammad Abdullah
2015-01-01
Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholders’ needs. However, there is increasing concern about whether know-how effectively improves understanding of underlying theories of project management processes for construction organizations and their project managers. Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance, but many worldwide constru...
Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities
International Nuclear Information System (INIS)
Frazier, T.P.
1994-01-01
This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans
Project management plan for the 105-C Reactor interim safe storage project. Revision 1
International Nuclear Information System (INIS)
Miller, R.L.
1997-01-01
In 1942, the Hanford Site was commissioned by the US Government to produce plutonium. Between 1942 and 1955, eight water-cooled, graphite-moderated reactors were constructed along the Columbia River at the Hanford Site to support the production of plutonium. The reactors were deactivated from 1964 to 1971 and declared surplus. The Surplus Production Reactor Decommissioning Project (BHI 1994b) will decommission these reactors and has selected the 105-C Reactor to be used as a demonstration project for interim safe storage at the present location and final disposition of the entire reactor core in the 200 West Area. This project will result in lower costs, accelerated schedules, reduced worker exposure, and provide direct benefit to the US Department of Energy for decommissioning projects complex wide. This project sets forth plans, organizational responsibilities, control systems, and procedures to manage the execution of the Project Management Plan for the 105-C Reactor Interim Safe Storage Project (Project Management Plan) activities to meet programmatic requirements within authorized funding and approved schedules. The Project Management Plan is organized following the guidelines provided by US Department of Energy Order 4700.1, Project Management System and the Richland Environmental Restoration Project Plan (DOE-RL 1992b)
New Production Reactor project-management plan
International Nuclear Information System (INIS)
McCrosson, F.J.; Hibbard, L.; Buckner, M.R.
1982-01-01
This document provides a project management plan for the first phase of a project to design and build a new production reactor (NPR) at SRP. The design of the NPR is based upon proven SRP heavy water reactor design, with several enhancements such as full containment, moderator detritiation, improved cooling, and modernized control rooms and instrumentation. The first phase of the NPR project includes environmental and safety analyses, preparation of the technical data summary and basic data, site studies, engineering studies, and conceptual design. The project management plan was developed by a 14-member task force comprised of representatives from the Technical Division, the Manufacturing Division, the Departmental Engineer's Office, and the Engineering Department
Integrated multi-resource planning and scheduling in engineering project
Directory of Open Access Journals (Sweden)
Samer Ben Issa
2017-01-01
Full Text Available Planning and scheduling processes in project management are carried out sequentially in prac-tice, i.e. planning project activities first without visibility of resource limitation, and then schedul-ing the project according to these pre-planned activities. This is a need to integrate these two pro-cesses. In this paper, we use Branch and Bound approach for generating all the feasible and non-feasible project schedules with/without activity splitting, and with a new criterion called “the Minimum Moments of Resources Required around X-Y axes (MMORR”, we select the best feasible project schedule to integrate plan processing and schedule processing for engineering projects. The results illustrate that this integrated approach can effectively select the best feasible project schedule among alternatives, improves the resource utilization, and shortens the project lead time.
Water resources of the Hartford-New Britain area, Connecticut
Cushman, Robert Vittum; Tanski, D.; Thomas, M.P.
1964-01-01
The Hartford-New Britain area includes the metropolitan areas of Hartford and New Britain and parts of several adjoining towns. Water used in the area is withdrawn from the principal streams and aquifers at an average rate of 463.5 mgd (million gallons per day). Sufficient water is available from these sources to meet present requirements and those for many years to come, although local shortages may develop in some areas as the result of problems of distribution and treatment. About 98 percent of all water used in 1957 was from surface sources. More than 425 mgd was required by industry, and about 23 mgd was for domestic water supply. The Farmington River upstream from Collinsville is the chief source of water for public supply in the Hartford-New Britain area, whereas the Connecticut River is the chief source of water for industry. An average of about 40 mgd is withdrawn from the upper Farmington River for public supply, and about 404 mgd is withdrawn by industry from the Connecticut River for nonconsumptive use and returned directly to the stream. The Connecticut River is the source of the largest quantity of water in the area. The flow of the stream at Thompsonville may be expected to equal or exceed about 2,000 mgd 95 percent of the time, and the flow should not be less than this amount for periods longer than 12 days. The flow below Thompsonville is increased by additions from the Scantic, Farmington, Park, and Hockanum Rivers and from numerous smaller tributary streams. The available streamflow data for the aforementioned rivers have been summarized graphically in the report. The chemical quality of water in the Connecticut River is good, except for short periods when the iron concentration is high. In addition to the removal of iron some other treatment may be necessary if water from the Connecticut River is used for special purposes. The chemical quality of the tributary streams is good, except the quality of the Park River, which is poor. Thus the
Conceptual Design Plan SM-43 Replacement Project
Energy Technology Data Exchange (ETDEWEB)
University of California, Los Alamos National Laboratory, SCC Project Office
2000-11-01
The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.
National Ignition Facility project acquisition plan
International Nuclear Information System (INIS)
Callaghan, R.W.
1996-04-01
The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertial Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF
Spent Nuclear Fuel Project operational staffing plan
International Nuclear Information System (INIS)
Debban, B.L.
1996-03-01
Using the Spent Nuclear Fuel (SNF) Project's current process flow concepts and knowledge from cognizant engineering and operational personnel, an initial assessment of the SNF Project radiological exposure and resource requirements was completed. A small project team completed a step by step analysis of fuel movement in the K Basins to the new interim storage location, the Canister Storage Building (CSB). This analysis looked at fuel retrieval, conditioning of the fuel, and transportation of the fuel. This plan describes the staffing structure for fuel processing, fuel movement, and the maintenance and operation (M ampersand O) staffing requirements of the facilities. This initial draft does not identify the support function resources required for M ampersand O, i.e., administrative and engineering (technical support). These will be included in future revisions to the plan. This plan looks at the resource requirements for the SNF subprojects, specifically, the operations of the facilities, balances resources where applicable, rotates crews where applicable, and attempts to use individuals in multi-task assignments. This plan does not apply to the construction phase of planned projects that affect staffing levels of K Basins
Single-Shell Tank (SST) Interim Stabilization Project Plan
International Nuclear Information System (INIS)
VLADIMIROFF, D.T.; BOYLES, V.C.
2000-01-01
This project plan establishes the management framework for the conduct of the CHG Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organization structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline
Bifulco, Robert; Cobb, Casey D.; Bell, Courtney
2009-01-01
Connecticut's interdistrict magnet schools offer a model of choice-based desegregation that appears to satisfy current legal constraints. This study presents evidence that interdistrict magnet schools have provided students from Connecticut's central cities access to less racially and economically isolated educational environments and estimates…
Study on Top-Down Estimation Method of Software Project Planning
Institute of Scientific and Technical Information of China (English)
ZHANG Jun-guang; L(U) Ting-jie; ZHAO Yu-mei
2006-01-01
This paper studies a new software project planning method under some actual project data in order to make software project plans more effective. From the perspective of system theory, our new method regards a software project plan as an associative unit for study. During a top-down estimation of a software project, Program Evaluation and Review Technique (PERT) method and analogy method are combined to estimate its size, then effort estimation and specific schedules are obtained according to distributions of the phase effort. This allows a set of practical and feasible planning methods to be constructed. Actual data indicate that this set of methods can lead to effective software project planning.
Crawler Acquisition and Testing Demonstration Project Management Plan
International Nuclear Information System (INIS)
DEFIGH-PRICE, C.
2000-01-01
If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support final design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler
Hispanic Vocational Exploration Project. Final Report.
Centro De La Comunidad, Inc., New London, CT.
During its second year, the Hispanic Vocational Exploration Project recruited eighth and ninth grade Hispanic youth for a four-week cycle, after-school, career exploratory program at Southeastern Regional Vocational Technical School, Groton, Connecticut. A series of career education workshops was the other major project activity. Supportive…
Planning a change project in mental health nursing.
Thorpe, Rebecca
2015-09-02
This article outlines a plan for a change project to improve the quality of physical health care on mental health wards. The plan was designed to improve the monitoring and recording of respiratory rates on mental health wards, through the implementation of a training programme for staff. A root cause analysis was used to explore the reasons for the low incidence of respiratory rate measurement on mental health wards, and the results of this establish the basis of the proposed change project and its aims and objectives. The article describes how the project could be implemented using a change management model, as well as how its effects could be measured and evaluated. Potential barriers to the planned change project are discussed, including the human dimensions of change. The article suggests methods to overcome such barriers, discusses the value of leadership as an important factor, and examines the principles of clinical governance in the context of the planned change project.
Evaluation of Connecticut's Interdistrict Magnet Schools
Cobb, Casey D.; Bifulco, Robert; Bell, Courtney
2009-01-01
As of October 2007, 54 interdistrict magnet schools enrolling 18,928 students were operating in Connecticut. The bulk of these schools are located in the Hartford and New Haven areas--21 in the Hartford area and 17 in the New Haven area. Interdistrict magnets also serve significant numbers of students in the Waterbury region. In keeping with the…
Life sciences space biology project planning
Primeaux, G.; Newkirk, K.; Miller, L.; Lewis, G.; Michaud, R.
1988-01-01
The Life Sciences Space Biology (LSSB) research will explore the effect of microgravity on humans, including the physiological, clinical, and sociological implications of space flight and the readaptations upon return to earth. Physiological anomalies from past U.S. space flights will be used in planning the LSSB project.The planning effort integrates science and engineering. Other goals of the LSSB project include the provision of macroscopic view of the earth's biosphere, and the development of spinoff technology for application on earth.
Trace elements and radionuclides in the Connecticut River and Amazon River estuary
International Nuclear Information System (INIS)
Dion, E.P.
1983-01-01
The Connecticut River, its estuary, and the Amazon River estuary were studied to elucidate some of the processes which control river water chemistry and the flux of elements to the sea. The approach taken was to identify inputs to the Connecticut River and to investigate geochemical processes which modify the dissolved load. The form and quantity of nuclides which are in turn supplied to the estuary are altered by processes unique to that transition zone to the ocean. The Connecticut River estuary was sampled on a seasonal basis to investigate the role of the estuary in controlling the flux of elements to the sea. The knowledge gained from the Connecticut River study was applied to the quantitatively more significant Amazon River estuary. There a variety of samples were analyzed to understand the processes controlling the single greatest flux of elements to the Atlantic Ocean. The results indicate that estimates of the total flux of nuclides to the oceans can best be calculated based on groundwater inputs. Unless significant repositories for nuclides exist in the river-estuarine system, the groundwater flux of dissolved nuclides is that which will eventually be delivered to the ocean despite the reactions which were shown to occur in both rivers and estuaries. 153 references, 63 figures, 28 tables
Quality Assurance Project Plan Development Tool
This tool contains information designed to assist in developing a Quality Assurance (QA) Project Plan that meets EPA requirements for projects that involve surface or groundwater monitoring and/or the collection and analysis of water samples.
National Security Technology Incubation Project Continuation Plan
Energy Technology Data Exchange (ETDEWEB)
None
2008-09-30
This document contains a project continuation plan for the National Security Technology Incubator (NSTI). The plan was developed as part of the National Security Preparedness Project (NSPP) funded by a Department of Energy (DOE)/National Nuclear Security Administration (NNSA) grant. This continuation plan describes the current status of NSTI (staffing and clients), long-term goals, strategies, and long-term financial solvency goals.The Arrowhead Center of New Mexico State University (NMSU) is the operator and manager of the NSTI. To realize the NSTI, Arrowhead Center must meet several performance objectives related to planning, development, execution, evaluation, and sustainability. This continuation plan is critical to the success of NSTI in its mission of incubating businesses with security technology products and services.
Spent Nuclear Fuel project interface control plan
International Nuclear Information System (INIS)
Reilly, M.A.
1995-01-01
This implementation process philosophy is in keeping with the ongoing reengineering of the WHC Controlled Manuals to achieve interface control within the SNF Project. This plan applies to all SNF Project sub-project to sub-project, and sub-project to exteranl (both on and off the Hanford Site) interfaces
Single-shell tank interim stabilization project plan
Energy Technology Data Exchange (ETDEWEB)
Ross, W.E.
1998-03-27
Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE`s Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities
Single-shell tank interim stabilization project plan
International Nuclear Information System (INIS)
Ross, W.E.
1998-01-01
Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE's Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities
77 FR 68800 - Connecticut; Major Disaster and Related Determinations
2012-11-16
... Connecticut have been designated as adversely affected by this major disaster: Fairfield, Middlesex, New Haven... within New London County for Individual Assistance. Fairfield, Middlesex, New Haven, and New London...
2011-06-28
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. TS11-4-000] The Connecticut Transmission Municipal Electric Energy Cooperative; Notice of Request for Waiver or Exemption Take notice that on June 8, 2011, the Connecticut Transmission Municipal Electric Energy Cooperative filed a petition...
Fuzzy multi-project rough-cut capacity planning
Masmoudi, Malek; Hans, Elias W.; Leus, Roel; Hait, Alain; Sotskov, Yuri N.; Werner, Frank
2014-01-01
This chapter studies the incorporation of uncertainty into multi-project rough-cut capacity planning. We use fuzzy sets to model uncertainties, adhering to the so-called possibilistic approach. We refer to the resulting proactive planning environment as Fuzzy Rough Cut Capacity Planning (FRCCP).
27 CFR 9.122 - Western Connecticut Highlands.
2010-04-01
... Highlands. 9.122 Section 9.122 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE... (Litchfield-Hartford-New Haven County line); (6) The boundary then travels approximately 7 miles west along the Litchfield-New Haven County line to Connecticut Route #8 at Waterville in the Town of Waterbury...
Ground-water resources of north-central Connecticut
Cushman, Robert Vittum
1964-01-01
The term 'north-central Connecticut' in this report refers to an area of about 640 square miles within the central lowland of the Connecticut River basin north of Middletown. The area is mostly a broad valley floor underlain by unconsolidated deposits of Pleistocene and Recent age which mantle an erosional surface formed on consolidated rocks of pre-Triassic and Triassic age. The mean annual precipitation at Hartford, near the center of the area, is 42.83 inches and is uniformly distributed throughout the year. The average annual streamflow from the area is about 22 inches or about half the precipitation. The consolidated water-bearing formations are crystalline rocks of pre-Triassic age and sedimentary and igneous rocks of the Newark group of Triassic age. The crystalline rocks include the Middletown gneiss, the Maromas granite gneiss, the Glastonbury granite-gneiss of Rice and Gregory (1906), and the Bolton schist which form the basement complex and the Eastern Upland of north-central Connecticut. Enough water for domestic, stock, and small commercial use generally can be obtained from the crystalline rocks. Recoverable ground water occurs in the interconnected joints and fracture zones and is yielded in amounts ranging from 29 to 35 gpm (gallons per minute) to wells ranging in depth from 29 to 550 feet. The sedimentary rocks of Triassic age underlie all the Connecticut River Lowland and are predominantly arkosic sandstone and shale. Water supplies sufficient for domestic, stock, and small commercial use can be obtained from shallow wells penetrating these rocks, and larger supplies sufficient for industries and smaller municipalities can probably be obtained from deeper wells. Reported yields range from ? to 578 gpm; the larger yields are generally obtained from wells between 300 and 600 feet in depth. Yields are larger where the overlying material is sand and gravel or where the rocks are well fractured. The igneous rocks of Triassic age are basalt and have
FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2
International Nuclear Information System (INIS)
1991-02-01
Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes ''end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made
Subjective risk assessment for planning conservation projects
International Nuclear Information System (INIS)
Game, Edward T; Fitzsimons, James A; Lipsett-Moore, Geoff; McDonald-Madden, Eve
2013-01-01
Conservation projects occur under many types of uncertainty. Where this uncertainty can affect achievement of a project’s objectives, there is risk. Understanding risks to project success should influence a range of strategic and tactical decisions in conservation, and yet, formal risk assessment rarely features in the guidance or practice of conservation planning. We describe how subjective risk analysis tools can be framed to facilitate the rapid identification and assessment of risks to conservation projects, and how this information should influence conservation planning. Our approach is illustrated with an assessment of risks to conservation success as part of a conservation plan for the work of The Nature Conservancy in northern Australia. Risks can be both internal and external to a project, and occur across environmental, social, economic and political systems. Based on the relative importance of a risk and the level of certainty in its assessment we propose a series of appropriate, project level responses including research, monitoring, and active amelioration. Explicit identification, prioritization, and where possible, management of risks are important elements of using conservation resources in an informed and accountable manner. (letter)
Pad A treatability study long-range project plan
International Nuclear Information System (INIS)
Mousseau, J.D.
1991-06-01
This plan addresses the work to be accomplished by the Pad A Treatability Study Project. The purpose of this project is to investigate potential treatment and separation technologies, identify the best technologies, and to demonstrate by both lab- and pilot-scale demonstration, the most applicable remedial technologies for treating plutonium-contaminated salts at the Pad A site located at the Subsurface Disposal Area (SDA) at the Radioactive Waste Management Complex (RWMC) a the Idaho National Engineering Laboratory (INEL). The conduct of this project will be supported by other DOE laboratories, universities, and private industries, who will provide support for near-term demonstrations of treatment and separation technologies. The purpose of this long-range planning document is to present the detailed plan for the implementation of the Pad A Treatability Study Project
Fast flux test facility, transition project plan
International Nuclear Information System (INIS)
Guttenberg, S.
1994-01-01
The FFTF Transition Project Plan, Revision 1, provides changes and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition
Fast flux test facility, transition project plan
Energy Technology Data Exchange (ETDEWEB)
Guttenberg, S.
1994-11-15
The FFTF Transition Project Plan, Revision 1, provides changes and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.
International Nuclear Information System (INIS)
Harty, W.M.
1995-01-01
This supporting document establishes the As Low As Reasonable Achievable (ALARA) Plan to be followed during Sluicing Project W-320 design and construction activities to minimize personnel exposure to radiation and hazardous materials
Energy Technology Data Exchange (ETDEWEB)
Harty, W.M.
1995-06-06
This supporting document establishes the As Low As Reasonable Achievable (ALARA) Plan to be followed during Sluicing Project W-320 design and construction activities to minimize personnel exposure to radiation and hazardous materials.
Quality planning in Construction Project
Othman, I.; Shafiq, Nasir; Nuruddin, M. F.
2017-12-01
The purpose of this paper is to investigate deeper on the factors that contribute to the effectiveness of quality planning, identifying the common problems encountered in quality planning, practices and ways for improvements in quality planning for construction projects. This paper involves data collected from construction company representatives across Malaysia that are obtained through semi-structured interviews as well as questionnaire distributions. Results shows that design of experiments (average index: 4.61), inspection (average index: 4.45) and quality audit as well as other methods (average index: 4.26) rank first, second and third most important factors respectively.
7 CFR 1948.78 - Growth management and housing planning projects.
2010-01-01
... 7 Agriculture 13 2010-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...
1982-12-01
Westbrook, especially if channel modifications are undertaken. Currently, local entrepreneurs are planning to construct new power- boat facilities...result. Value of Delay Time Existing S14,400 W/Plan B 7,200 PLAN B: Annual Benefit = S 7,200 PLAN C Plan C would increse the width of the existing channel
Gun Violence, mental health, and Connecticut physicians.
Dodds, Peter R; Anderson, Caitlyn O; Dodds, Jon H
2014-01-01
While there is a public perception that gun violence is associated with mental illness we present evidence that it is a complex public health problem which defies simple characterizations and solutions. Only a small percentage of individuals with mental illness are at risk for extreme violence and they account for only a small percentage of gun-related homicides. Individuals who are at risk for gun violence are difficult to identify and successfully treat. The incidence, and perhaps the demographics, of gun violence vary substantially from state to state. We make a case for Connecticut physicians to study gun violence at the state level. We recommend that Connecticut physicians promote and expand upon the American Academy of Pediatrics' recommendation for creating a "safe home environment. "We suggest that guns be secured in all homes in which there are children. In addition we suggest that guns be voluntarily removed from homes in which there are individuals with a history of violence, threats of violence, depression, drug and/or alcohol abuse, and individuals with major mental illnesses who are not cooperating with therapy.
Project Planning and Control in a Developing Economy: Implementation and Realisation
Directory of Open Access Journals (Sweden)
H. Abdul-Rahman
2005-12-01
Full Text Available In the competitive and uncertain environment of the construction industry, the ability to deliver end products with the required quality, schedule and budget is vital to the survival of any construction-related firm. Before embarking on any project, realistic planning and, consequently, a control procedure must be in place to enable the parties to manage the project with sufficient degree of authority and certainty. This paper addresses issues associated with the implementation of project planning and control, identificati on of impacts in the implementation of project planning and the critical success factors of project planning. A questionnaire survey was conducted on construction professionals and contractors involved in the running of construction projects. The survey results showed that common problems associated with the project planning and control are the lack of experienced staff and poor coordination by the contractor. During site operation, a delay in decision making aggravates the effect of poor planning and control and much of the effect of project planning rests on the pro-activeness of experienced staff. The positive impact associated with proper planning and control is the high probability of finishing the project on time while the negative impact is that it is a time-consuming and costly process. The critical success factors identified from the survey are Excellent Teamwork and Experienced Team.
UMTRA Project environmental, health, and safety plan
International Nuclear Information System (INIS)
1989-02-01
The basic health and safety requirements established in this plan are designed to provide guidelines to be applied at all Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Specific restrictions are given where necessary. However, an attempt has been made to provide guidelines which are generic in nature, and will allow for evaluation of site-specific conditions. Health and safety personnel are expected to exercise professional judgment when interpreting these guidelines to ensure the health and safety of project personnel and the general population. This UMTRA Project Environmental, Health, and Safety (EH ampersand S) Plan specifies the basic Federal health and safety standards and special DOE requirements applicable to this program. In addition, responsibilities in carrying out this plan are delineated. Some guidance on program requirements and radiation control and monitoring is also included. An Environmental, Health, and Safety Plan shall be developed as part of the remedial action plan for each mill site and associated disposal site. Special conditions at the site which may present potential health hazards will be described, and special areas that should should be addressed by the Remedial Action Contractor (RAC) will be indicated. Site-specific EH ampersand S concerns will be addressed by special contract conditions in RAC subcontracts. 2 tabs
7 CFR 1219.50 - Budgets, programs, plans, and projects.
2010-01-01
... of appropriate programs, plans, or projects for advertising, sales promotion, other promotion, and... HASS AVOCADO PROMOTION, RESEARCH, AND INFORMATION Hass Avocado Promotion, Research, and Information... promotion, industry information, consumer information, and related research programs, plans, and projects...
Fiscal planning of private electricity production projects
International Nuclear Information System (INIS)
Gauthier, R.
2002-01-01
Various fiscal considerations frequently encountered in the context of the planning of private electricity production projects were described. Two major themes were discussed: 1) the different jurisdictional vehicles that can be used during the planning of private electricity production projects and the associated fiscal considerations, and 2) the two main fiscal incentives of the Income Tax Act (Canada) which could impact on the financing and operation costs of such a project, namely the accelerated amortization and the possibility of deducting the costs associated to renewable energies and energy savings in Canada. This was a general presentation that did not go into specific details and did not represent a legal opinion. refs
The CHPRC Columbia River Protection Project Quality Assurance Project Plan
International Nuclear Information System (INIS)
Fix, N.J.
2008-01-01
Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff
The CHPRC Columbia River Protection Project Quality Assurance Project Plan
Energy Technology Data Exchange (ETDEWEB)
Fix, N. J.
2008-11-30
Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.
FY95 software project management plan: TMACS, CASS computer systems
International Nuclear Information System (INIS)
Spurling, D.G.
1994-01-01
The FY95 Work Plan for TMACS and CASS Software Projects describes the activities planned for the current fiscal year. This plan replaces WHC-SD-WM-SDP-008. The TMACS project schedule is included in the TWRS Integrated Schedule
Quality assurance program plan fuel supply shutdown project
International Nuclear Information System (INIS)
Metcalf, I.L.
1998-01-01
This Quality Assurance Program plan (QAPP) describes how the Fuel Supply Shutdown (FSS) project organization implements the quality assurance requirements of HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) and the B and W Hanford Company Quality Assurance Program Plan (QAPP), FSP-MP-004. The QAPP applies to facility structures, systems, and components and to activities (e.g., design, procurement, testing, operations, maintenance, etc.) that could affect structures, systems, and components. This QAPP also provides a roadmap of applicable Project Hanford Policies and Procedures (PHPP) which may be utilized by the FSS project organization to implement the requirements of this QAPP
Pu-238 Supply Program Project Execution Plan
International Nuclear Information System (INIS)
Wham, Robert M.; Martin, Sherman
2012-01-01
This Pu-238 Supply Program Project Execution Plan (PEP) summarizes critical information and processes necessary to manage the program. The PEP is the primary agreement regarding planning and objectives between The Department of Energy Office of Nuclear Energy (DOE NE-75), Oak Ridge National Laboratory Site Office (OSO) and the Oak Ridge National Laboratory (ORNL). The acquisition executive (AE) will approve the PEP. The PEP is a living document that will be reviewed and revised periodically until the project is complete. The purpose of the project is to reestablish the capability to produce plutonium-238 (Pu-238) domestically. This capability consists primarily of procedures, processes, and design information, not capital assets. As such, the project is not subject to the requirements of DOE O 413.3B, but it will be managed using the project management principles and best practices defined there. It is likely that some capital asset will need to be acquired to complete tasks within the project. As these are identified, project controls and related processes will be updated as necessary. Because the project at its initiation was envisioned to require significant capital assets, Critical Decision 0 (CD-0) was conducted in accordance with DOE O 413.3B, and the mission need was approved on December 9, 2003, by William Magwood IV, director of the Office of Nuclear Energy (NE), Science and Technology, DOE. No date was provided for project start-up at that time. This PEP is consistent with the strategy described in the June 2010 report to Congress, Start-up Plan for Plutonium-238 Production for Radioisotope Power Systems.
SNF project engineering process improvement plan
International Nuclear Information System (INIS)
DESAI, S.P.
1999-01-01
This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819. All new procedures will be issued and implemented by September 30, 1999
Project management plan for exploratory shaft at Yucca Mountain
International Nuclear Information System (INIS)
1983-08-01
This Project Management Plan (PMP) provides the basic guidance and describes the organizational structure and procedures for the design, construction, and testing of a large-diameter Exploratory Shaft (ES) in tuffaceous media as a major element within the Nevada Nuclear Waste Storage Investigations (NNWSI) project, which is a part of the National Waste Terminal Storage (NWTS) Program, US Department of Energy (DOE). The PMP encompasses activities identified as construction phase and in situ phase testing to be conducted from the ES through September 30, 1986. Specific topics addressed are the ES project objectives, the management organization and responsibilities, functional support requirements, work plan (including quality assurance aspects), work breakdown structure, milestone schedule, logic diagram, performance criteria, cost estimates, management control systems, procurement plan, test plan, and environmental, health and safety plans
HANDI 2000 project execution plan
International Nuclear Information System (INIS)
BENNION, S.I.
1999-01-01
The HANDI 2000 project will meet some of the major objectives and goals of the PHMC Management and Integration Plan, HNF-MP-00/Rev. 11, by integrating the major Hanford business processes and their supporting information systems
Geologic features of the Connecticut Valley, Massachusetts, as related to recent floods
Jahns, Richard Henry
1947-01-01
This report gives the results of a geologic study of certain features that bear upon the recent flood behavior of rivers flowing in the Massachusetts part of the Connecticut Valley. It is in part an outline of the physiographic history of the Connecticut River, a 'history that is treated in progressively greater detail as it concerns events occurring from Mesozoic time to the present, and in part a discussion of erosional and depositional processes associated with the extraordinary floods of March 1936 and September 1938. The Connecticut River flows southward through Massachusetts in a broad lowland area of more than 400 square miles and is joined in this area by four large tributaries, the Deerfield and Westfield Rivers from the west and the Millers and Chicopee Rivers from the east. The lowland area, or :Connecticut Valley province, is flanked on the west by the Berkshire Hills, a, deeply incised uplifted plateau, and on the east by the central upland, or Worcester .County plateau, a lower upland marked by rolling topography. Most of the broad, relatively flat valley floor is underlain by Triassic sedimentary rocks. Rising above it, however, are the prominent Holyoke-Mount Tom and Deerfield Ranges, which consist in large part of dark-colored igneous rocks, also of Triassic age. There is evidence of several cycles of erosion in central western Massachusetts, the last two of which are of Tertiary age and appear to have reached nature and very youthful stages of topographic development, respectively. Immediately prior to the glacial epoch, therefore, the Connecticut River flowed in a fairly narrow, deep gorge, which it had incised in the rather flat 5ottom of the valley that it had formed at an earlier stage. A Pleistocene crustal subsidence probably of several hundred feet, for which there has been only partial compensation in postglacial time, was responsible for the present position of much of this gorge below sea level. That an estuary does not now occupy the
Comprehensive Evaluation of Large Infrastructure Project Plan with ANP
Institute of Scientific and Technical Information of China (English)
HAN Chuan-feng; CHEN Jian-ye
2005-01-01
Analytic Network Process(ANP) was used in comprehensive evaluation of large infrastructure project plan. A model including social economy, ecological environment, and resources was established with ANP method. The evaluation pattern of hierarchy structure and comprehensive evaluation method for quantity and quality of large infrastructure project were put forward, which provides an effective way to evaluate the large infrastructure project plan. Quantitative analysis indicated that the internal dependence relation of hierarchy structure has influence on ranking results of plan. It is suggested that considering the internal relation can helps managers make effective decisions.
International Nuclear Information System (INIS)
Albanese, Joseph; Martens, Kelly; Arnold, Jeffrey L.; Kelley, Katherine; Kristie, Virginia; Forte, Elaine; Schneider, Mark; Dainiak, Nicholas
2007-01-01
Biodosimetry, based on the analysis of dicentric chromosomes in circulating mononuclear cells, is considered the 'gold standard' for estimating radiation dose and is used to make informed decisions regarding the medical management of irradiated persons. This paper describes the development of biodosimetry laboratory surge capacity for the health consequences of radiological and nuclear disasters in Connecticut, including: (1) establishment of the Biodosimetry Laboratory for the timely assessment of radiation dosage in biodosimetry specimens; (2) identification of clinical laboratories qualified and willing to process biodosimetry specimens from a large number of victims; (3) training of clinical laboratorians in initial biodosimetry specimen processing; and (4) conducting a functional drill that evaluated the effectiveness of these elements. Descriptive information was obtained from: (1) personal observations; (2) a needs assessment of clinical laboratories in Connecticut; (3) records from a training program of clinical laboratorians in biodosimetry specimen processing that was developed and provided by the Yale New Haven Center for Emergency Preparedness and Disaster Response; and (4) records from a statewide functional drill in biodosimetry specimen processing that was developed and conducted by the State of Connecticut Biodosimetry Laboratory. A needs assessment of clinical laboratories in Connecticut identified 30 of 32 clinical laboratories qualified and willing to perform initial biodosimetry specimen processing. Currently, 79 clinical laboratorians in 19 of these qualified clinical laboratories have been trained in biodosimetry specimen processing. A functional exercise was conducted involving 37 of these trained clinical laboratorians in 18 qualified laboratories as well as the Biodosimetry Laboratory. The average turnaround time for biodosimetry specimen processing in this drill was 199 min. Exercise participants provided feedback which will be used to
Planned Positron Factory project
International Nuclear Information System (INIS)
Okada, Sohei
1990-01-01
The Japan Atomic Energy Research Institute, JAERI, has started, drafting a construction plan for the 'Positron Factory', in which intense energy-controllable monoenergetic positron beams are produced from pair-production reactions caused by high-energy electrons from a linac. The JAERI organized a planning committee to provide a basic picture for the Positron Factory. This article presents an overview of the interactions of positrons, intense positron sources and the research program and facilities planned for the project. The interactions of positrons and intense positron sources are discussed focusing on major characteristics of positrons in different energy ranges. The research program for the Positron Factory is then outlined, focusing on advanced positron annihilation techniques, positron spectroscopy (diffraction, scattering, channeling, microscopy), basic positron physics (exotic particle science), and positron beam technology. Discussion is also made of facilities required for the Positron Factory. (N.K.)
Graduate Student Project: Operations Management Product Plan
Fish, Lynn
2007-01-01
An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…
ASME XI stroke time testing of solenoid valves at Connecticut Yankee Station
Energy Technology Data Exchange (ETDEWEB)
Martin, C.W.
1996-12-01
Connecticut Yankee Atomic Power Company has developed the capability of measuring the stroke times of AC and DC solenoid valves. This allows the station to measure the stroke time of any solenoid valve in the plant, even those valves which do not have valve stem position indicators. Connecticut Yankee has adapted the ITI MOVATS Checkmate 3 system, using a signal input from a Bruel and Kjaer (B&K) Model 4382 acoustic accelerometer and the Schaumberg Campbell Associates (SCA) Model SCA-1148 dual sensor, which is a combined accelerometer and gaussmeter.
ASME XI stroke time testing of solenoid valves at Connecticut Yankee Station
International Nuclear Information System (INIS)
Martin, C.W.
1996-01-01
Connecticut Yankee Atomic Power Company has developed the capability of measuring the stroke times of AC and DC solenoid valves. This allows the station to measure the stroke time of any solenoid valve in the plant, even those valves which do not have valve stem position indicators. Connecticut Yankee has adapted the ITI MOVATS Checkmate 3 system, using a signal input from a Bruel and Kjaer (B ampersand K) Model 4382 acoustic accelerometer and the Schaumberg Campbell Associates (SCA) Model SCA-1148 dual sensor, which is a combined accelerometer and gaussmeter
Siberian Chemical Combine laboratory project work plan, fiscal year 1999
International Nuclear Information System (INIS)
Morgado, R.E.; Acobyan, R.; Shropsire, R.
1998-01-01
The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites' input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves
7 CFR 275.18 - Project area/management unit corrective action plan.
2010-01-01
... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
Adoption of Building Information Modelling in project planning risk management
Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.
2017-11-01
An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.
Tank Waste Remediation System Projects Document Control Plan
International Nuclear Information System (INIS)
Slater, G.D.; Halverson, T.G.
1994-01-01
The purpose of this Tank Waste Remediation System Projects Document Control Plan is to provide requirements and responsibilities for document control for the Hanford Waste Vitrification Plant (HWVP) Project and the Initial Pretreatment Module (IPM) Project
The Groundwater Performance Assessment Project Quality Assurance Plan
International Nuclear Information System (INIS)
Luttrell, Stuart P.
2006-01-01
U.S. Department of Energy (DOE) has monitored groundwater on the Hanford Site since the 1940s to help determine what chemical and radiological contaminants have made their way into the groundwater. As regulatory requirements for monitoring increased in the 1980s, there began to be some overlap between various programs. DOE established the Groundwater Performance Assessment Project (groundwater project) in 1996 to ensure protection of the public and the environment while improving the efficiency of monitoring activities. The groundwater project is designed to support all groundwater monitoring needs at the site, eliminate redundant sampling and analysis, and establish a cost-effective hierarchy for groundwater monitoring activities. This document provides the quality assurance guidelines that will be followed by the groundwater project. This QA Plan is based on the QA requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--General Provisions/Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory's Standards-Based Management System. In addition, the groundwater project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The groundwater project has determined that the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan
7 CFR 1250.314 - Plans and projects.
2010-01-01
... research, consumer and producer education, advertising, marketing, product development, and promotion plans... 7 Agriculture 10 2010-01-01 2010-01-01 false Plans and projects. 1250.314 Section 1250.314 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING...
Missed opportunities to prevent tuberculosis in foreign-born persons, Connecticut, 2005-2008.
Guh, A; Sosa, L; Hadler, J L; Lobato, M N
2011-08-01
Factors that influence testing for latent tuberculosis infection (LTBI) among foreign-born persons in Connecticut are not well understood. To identify predictors for LTBI testing and challenges related to accessing health care among the foreign-born population in Connecticut. Foreign-born Connecticut residents with confirmed or suspected tuberculosis (TB) disease during June 2005-December 2008 were interviewed regarding health care access and immigration status. Predictors for self-reported testing for LTBI after US entry were determined. Of 161 foreign-born persons interviewed, 48% experienced TB disease within 5 years after arrival. One third (51/156) reported having undergone post-arrival testing for LTBI. Although those with established health care providers were more likely to have reported testing (aOR 4.49, 95%CI 1.48-13.62), only 43% of such persons were tested. Undocumented persons, the majority of whom lacked a provider (53%), were less likely than documented persons to have reported testing (aOR 0.20, 95%CI 0.06-0.67). Hispanic permanent residents (immigrants and refugees) and visitors (persons admitted temporarily) were more likely than non-Hispanics in the respective groups to have reported testing (OR 5.25, 95%CI 1.51-18.31 and OR 7.08, 95%CI 1.30-38.44, respectively). The self-reported rate of testing for LTBI among foreign-born persons in Connecticut with confirmed or suspected TB was low and differed significantly by ethnicity and immigration status. Strategies are needed to improve health care access for foreign-born persons and expand testing for LTBI, especially among non-Hispanic and undocumented populations.
Guidance and Control Software Project Data - Volume 1: Planning Documents
Hayhurst, Kelly J. (Editor)
2008-01-01
The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the planning documents from the GCS project. Volume 1 contains five appendices: A. Plan for Software Aspects of Certification for the Guidance and Control Software Project; B. Software Development Standards for the Guidance and Control Software Project; C. Software Verification Plan for the Guidance and Control Software Project; D. Software Configuration Management Plan for the Guidance and Control Software Project; and E. Software Quality Assurance Activities.
H2020 692819 SIMPATICO - D1.1: Project Management Plan
Forner, Pamela; Gerosa, Matteo; Folograna, Antonio
2017-01-01
This document is the deliverable “D1.1 – Project Management Plan” of the European project “SIMPATICO - SIMplifying the interaction with Public Administration Through Information technology for Citizens and cOmpanies” (hereinafter also referred to as “SIMPATICO”, project reference: 692819). The SIMPATICO Project Management Plan (PMP) is the main planning document and describes how major aspects of the project are managed, monitored and controlled. It is intended to provide gu...
Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan
International Nuclear Information System (INIS)
Baide, D.G.; Webster, T.L.
1995-12-01
The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list
Selection of projects in the regional energy planning
International Nuclear Information System (INIS)
Ramirez P, R.; Navas M, F.
1993-01-01
The processes of regional energy planning have changed vastly in the last years and it will continue changing in the future for the new norm of the State. This work tries to show the use of systematic tools in the selection of regional energy projects. It discusses a methodology of selection of projects based on a multivariate technical. It is applied in the Southwestern region of Colombia and both selection and priority results are obtained. The designed methodology allows to make the selection of projects in an automatic way with a software designed for such an end. In the case of Southwestern it arrives to a briefcase of projects for an energy plan and made for other races
Mullaney, John R.; Martin, Joseph W.; Morrison, Jonathan
2018-03-20
The daily and annual loads of nitrate plus nitrite and total nitrogen for the Connecticut River at Middle Haddam, Connecticut, were determined for water years 2009 to 2014. The analysis was done with a combination of methods, which included a predefined rating curve method for nitrate plus nitrite and total nitrogen for water years 2009 to 2011 and a custom rating curve method that included sensor measurements of nitrate plus nitrite nitrogen concentration and turbidity along with mean daily flow to determine total nitrogen loads for water years 2011 to 2014. Instantaneous concentrations of total nitrogen were estimated through the use of a regression model based on sensor measurements at 15-minute intervals of nitrate plus nitrite nitrogen and turbidity for water years 2011 to 2014.Annual total nitrogen loads at the Connecticut River at Middle Haddam ranged from 12,900 to 19,200 metric tons, of which about 42 to 49 percent was in the form of nitrate plus nitrite. The mean 95-percent prediction intervals on daily total nitrogen load estimates were smaller from the custom model, which used sensor data, than those calculated by the predefined model.Annual total nitrogen load estimates at the Connecticut River at Middle Haddam were compared with the upstream load estimates at the Connecticut River at Thompsonville, Conn. Annual gains in total nitrogen loads between the two stations ranged from 3,430 to 6,660 metric tons. These increases between the two stations were attributed to the effects of increased urbanization and to combined annual discharges of 1,540 to 2,090 metric tons of nitrogen from 24 wastewater treatment facilities in the drainage area between the two stations. The contribution of total nitrogen from wastewater discharge between the two stations had declined substantially before the beginning of this study and accounted for from 31 to 52 percent of the gain in nitrogen load between the Thompsonville and Middle Haddam sites.
Nunziato, Travis
2014-01-01
"You Say Tomato, I Say Solanum Lycopersicum Containing Beta-ionone and Phenylacetaldehyde" discusses the importance of requiring labels on products that contain genetically modified organisms, focusing on Connecticut's GMO Labeling statutes, as it is they are the first of their kind in the nation. The article will compare Connecticut's law to the legislation found in Australia, highlighting the positive aspects of Connecticut's bill and identifying its key weaknesses, namely the "trigger clause" found in the statute. Part I will provide an overview of Genetic Modification and provide a brief history of Biotechnology. It will also provide a brief overview of the federal regulatory framework in biotechnology, as well as evaluate the United States Food and Drug Association's role of regulating genetic modification. Part I will conclude by discussing how the American public has shown that labeling GMOs is important, and something that should occur. Part II of this article will explore Connecticut's recent legislation requiring labels on products that contain GMOs. Part III will explore Australia's legislation requiring labels on products containing GMOs, comparing Australia's law to Connecticut's legislation.
233S Decommissioning Project Environmental Control Plan
International Nuclear Information System (INIS)
Zoric, J.P.
2000-01-01
This Environmental Control Plan is for the 233S Decommissioning activities conducted under the removal action report for the 233S Decontamination and Demolition Project. The purpose of this ECP is to identify environmental requirements for the 233S project. The ECP is a compilation of existing environmental permit conditions, regulatory requirements, and environmental requirements applicable to the specific project or functional activity
Project Management Plan for the INEL technology logic diagrams
International Nuclear Information System (INIS)
Rudin, M.J.
1992-10-01
This Project Management Plan (PjMP) describes the elements of project planning and control that apply to activities outlined in Technical Task Plan (TTP) ID-121117, ''Technology Logic Diagrams For The INEL.'' The work on this project will be conducted by personnel in EG ampersand G Idaho, Inc.'s Waste Technology Development Program. Technology logic diagrams represent a formal methodology to identify technology gaps or needs within Environmental Restoration/Waste Management Operations, which will focus on Office of Environmental Restoration and Waste Management (EM-50) research and development, demonstration, test, and evaluation efforts throughout the US Department of Energy complex. This PjMP describes the objectives, organization, roles and responsibilities, workscope and processes for implementing and managing the technology logic diagram for the Idaho National Engineering Laboratory project
Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.
Energy Technology Data Exchange (ETDEWEB)
Childs, Allen
2002-03-01
This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.
Strategic plan: A tool to improve IPP project earnings
International Nuclear Information System (INIS)
LeClerc, S.
1997-01-01
This paper presents a strategic plan to analyze and convert project operations to gain short-term and long-term economic benefits. Areas of Opportunity were identified which may result in improved project economics from Independent Power Producers' project reviews. This paper discusses each Area of Opportunity, suggests options for investigation, and provides a potential magnitude of upside for solid fuel circulating fluidized bed projects in the 50 MW project size. The Areas of Opportunity are: (1) Power Purchase Agreement Modifications; (2) Fuel Use Optimization; (3) Power Plant Upgrades; (4) Power Plant Depreciation Schedule And FAS 121 Analysis; (5) Operation ampersand Maintenance Review; (6) Financial Contract Review; (7) Environmental Review; (8) Insurance Coverage Review; (9) Internal Management Review; and (10) Strategic Development For Energy Sales. Ten appendices are included which comprise a sample Strategic Plan: (1) Potential Plant Upgrades, (2) Enhancement Criteria, (3) Age of Coal Burning Plants, (4) Btu Energy Price Summary, (5) Typical Operation and Maintenance Audit Findings, (6) Typical Performance Objectives and Guidelines, (7) Typical Heavy Metal Emissions, (8) Typical Strategic Plan Formulation, (9) Strategic Plan Implementation Schedule, and (10) Typical Decision Tree. 8 refs
Pietras, Jesse John
Remote education has arrived in Connecticut and is promising to expand, as this discussion of its development, progress, and difficulties demonstrates. In June 1993, state legislation mandated a feasibility study of ways to bring about bidirectional educational programming among Connecticut's 26 cable-franchise operators. Cost allocation for the…
Recurrent mass mortalities of the blueback herring, Alosa aestivalis, in the lower Connecticut River
International Nuclear Information System (INIS)
Moss, S.A.; Leggett, W.C.; Boyd, W.A.
1976-01-01
The authors studied 5 mass mortalities of blueback herring, Alosa aestivalis between 1965 and 1971. The reach of the Connecticut River in which the mortalities were observed includes the region thermally influenced by cooling water effluents from the Connecticut Yankee Atomic Power Plant. This warm water effluent has not been related to catastrophic blueback herring mortalities to the present time. The mortalities observed in 1965, 1966, and 1967 occurred before the plant became operational. The years of no abnormal mortalities, 1968, 1969, and 1970 coincided with periods of near-maximum generating output by this power plant. Only in June, 1971, did power plant operation coincide with a mass mortality of herring. Nevertheless, the occurrence of herring mortalities in four years out of seven observed suggests that further deterioration of water quality in the Connecticut River may threaten the continued spawning success of this fish. 9 references, 4 figures, 4 tables
The joint EC/EPA mid-Connecticut test program
International Nuclear Information System (INIS)
Kilgroe, J.D.; Brna, T.G.
1991-01-01
In early 1989, Environment Canada and the U.S. Environmental Protection Agency sponsored a comprehensive test program on a refuse-derived fuel (RDF) unit of the Mid-Connecticut facility in Hartford. The program, conducted in cooperation with the Connecticut Resource Recovery Authority (CRRA), the facility's operator, included characterization and performance test phases. The results of the characterization tests were used in defining both the combustion and flue gas cleaning system operating conditions for the performance tests. The results of the performance tests are emphasized in this paper and are summarized in three parts. First, the combustion tests results will be addressed and related to good combustion practice for RDF combustors. Then, the performance of the lime spray dryer absorber/fabric filter system in controlling acid gas (hydrogen chloride, sulfur dioxide), trace organic [polychlorinated dibenzodioxin (PCDD) and polychlorinated dibenzofuran (PCDF)], trace metal [arsenic (as), cadmium (Cd), chromium (Cr), lead (Pb), mercury (Hg), nickel (Ni), and zinc (Zn)], and particulate matter (PM) emissions will be discussed. Finally, the results of ash/residue analyses will be presented
Digital preservation of a highway photolog film archive in Connecticut.
2014-01-28
The Connecticut Department of Transportation has been photologging their transportation network : for over forty years. Photologging at a minimum refers to the use of an instrumented vehicle, which is : designed to capture successive photographs of t...
Project X Accelerator R and D Plan
International Nuclear Information System (INIS)
2008-01-01
Project X is a high intensity proton facility conceived to support a world-leading program in neutrino and flavor physics over the next two decades at Fermilab. Project X is an integral part of the Fermilab Roadmap as described in the Fermilab Steering Group Report. Project X is based on an 8 GeV superconducting H-linac, paired with the existing (but modified) Main Injector and Recycler Ring, to provide in excess of 2 MW of beam power throughout the energy range 60-120 GeV, simultaneous with at least 100 kW of beam power at 8 GeV. The linac utilizes technology in common with the ILC over the energy range 0.6-8.0 GeV. Beam current parameters can be made identical to ILC resulting in identical rf generation and distribution systems. This alignment of ILC and Project X technologies allows for a shared development effort. The initial 0.6 GeV of the linac draws heavily on technology developed by Argonne National Laboratory for a facility for rare isotope beams. It is anticipated that the exact configuration and operating parameters of the linac will be defined through the R and D program and will retain alignment with the ILC plan as it evolves over this period. Utilization of the Recycler Ring as an H - stripper and accumulator ring is the key element that provides the flexibility to operate the linac with the same beam parameters as the ILC. The linac operates at 5 Hz with a total of 5.6 x 10 13 H - ions delivered per pulse. H - are stripped at injection into the Recycler in a manner that 'paints' the beam both transversely and longitudinally to reduce space charge forces. Following the 1 ms injection, the orbit moves off the stripping foil and circulates for 200 msec, awaiting the next injection. Following three such injections a total of 1.7 x 10 14 protons are transferred in a single turn to the Main Injector. These protons are then accelerated to 120 GeV and fast extracted to a neutrino target. The Main Injector cycle takes 1.4 seconds, producing approximately 2
Connecticut Children's Medical Center multi-year branding campaign.
Botvin, J
2000-01-01
As the only children's hospital in the state, Connecticut Children's Medical Center was challenged by the inherent complacency of parents. It met the challenge through a multi-level marketing effort which included television and radio, community outreach and strong media relations. By emphasizing the unique nature of children, the campaign affirms the need for a specialized children's health center.
Project Rulison: post-shot plans and evaluations
Energy Technology Data Exchange (ETDEWEB)
1969-12-01
Project Rulison post-shot plans and evaluations are discussed and include physical characteristics of the Rulison cavity; pressure and temperature expected in the cavity; amount, nature, and distribution of radioactivity in the cavity; reentry plan; radioactive species which may be encountered during reentry; public safety considerations arising from release of radioactivity; procedures to assure public safety; and the radiological safety plan. Maximum hypothetical accidents and ecological considerations are discussed in the appendices.
ERD UMTRA Project quality assurance program plan, Revision 7
International Nuclear Information System (INIS)
1995-09-01
This document is the revised Quality Assurance Program Plan (QAPP) dated September, 1995 for the Environmental Restoration Division (ERD) Uranium Mill Tailings Remedial Action Project (UMTRA). Quality Assurance requirements for the ERD UMTRA Project are based on the criteria outlined in DOE Order 5700.6C or applicable sections of 10 CFR 830.120. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the ERD UMTRA Project and its contractors
Integration of fall prevention into state policy in Connecticut.
Murphy, Terrence E; Baker, Dorothy I; Leo-Summers, Linda S; Bianco, Luann; Gottschalk, Margaret; Acampora, Denise; King, Mary B
2013-06-01
To describe the ongoing efforts of the Connecticut Collaboration for Fall Prevention (CCFP) to move evidence regarding fall prevention into clinical practice and state policy. A university-based team developed methods of networking with existing statewide organizations to influence clinical practice and state policy. We describe steps taken that led to funding and legislation of fall prevention efforts in the state of Connecticut. We summarize CCFP's direct outreach by tabulating the educational sessions delivered and the numbers and types of clinical care providers that were trained. Community organizations that had sustained clinical practices incorporating evidence-based fall prevention were subsequently funded through mini-grants to develop innovative interventional activities. These mini-grants targeted specific subpopulations of older persons at high risk for falls. Building collaborative relationships with existing stakeholders and care providers throughout the state, CCFP continues to facilitate the integration of evidence-based fall prevention into clinical practice and state-funded policy using strategies that may be useful to others.
Fast Flux Test Facility, Sodium Storage Facility project-specific project management plan
International Nuclear Information System (INIS)
Shank, D.R.
1994-01-01
This Project-Specific Project Management Plan describes the project management methods and controls used by the WHC Projects Department to manage Project 03-F-031. The Sodium Storage Facility provides for storage of the 260,000 gallons of sodium presently in the FFTF Plant. The facility will accept the molten sodium transferred from the FFTF sodium systems, and store the sodium in a solid state under an inert cover gas until such time as a Sodium Reaction Facility is available for final disposal of the sodium
Fast Flux Test Facility, Sodium Storage Facility project-specific project management plan
Energy Technology Data Exchange (ETDEWEB)
Shank, D.R.
1994-12-29
This Project-Specific Project Management Plan describes the project management methods and controls used by the WHC Projects Department to manage Project 03-F-031. The Sodium Storage Facility provides for storage of the 260,000 gallons of sodium presently in the FFTF Plant. The facility will accept the molten sodium transferred from the FFTF sodium systems, and store the sodium in a solid state under an inert cover gas until such time as a Sodium Reaction Facility is available for final disposal of the sodium.
Spent nuclear fuel project high-level information management plan
Energy Technology Data Exchange (ETDEWEB)
Main, G.C.
1996-09-13
This document presents the results of the Spent Nuclear Fuel Project (SNFP) Information Management Planning Project (IMPP), a short-term project that identified information management (IM) issues and opportunities within the SNFP and outlined a high-level plan to address them. This high-level plan for the SNMFP IM focuses on specific examples from within the SNFP. The plan`s recommendations can be characterized in several ways. Some recommendations address specific challenges that the SNFP faces. Others form the basis for making smooth transitions in several important IM areas. Still others identify areas where further study and planning are indicated. The team`s knowledge of developments in the IM industry and at the Hanford Site were crucial in deciding where to recommend that the SNFP act and where they should wait for Site plans to be made. Because of the fast pace of the SNFP and demands on SNFP staff, input and interaction were primarily between the IMPP team and members of the SNFP Information Management Steering Committee (IMSC). Key input to the IMPP came from a workshop where IMSC members and their delegates developed a set of draft IM principles. These principles, described in Section 2, became the foundation for the recommendations found in the transition plan outlined in Section 5. Availability of SNFP staff was limited, so project documents were used as a basis for much of the work. The team, realizing that the status of the project and the environment are continually changing, tried to keep abreast of major developments since those documents were generated. To the extent possible, the information contained in this document is current as of the end of fiscal year (FY) 1995. Programs and organizations on the Hanford Site as a whole are trying to maximize their return on IM investments. They are coordinating IM activities and trying to leverage existing capabilities. However, the SNFP cannot just rely on Sitewide activities to meet its IM requirements
Arsenic and uranium in private wells in Connecticut, 2013-15
Flanagan, Sarah M.; Brown, Craig J.
2017-05-03
The occurrence of arsenic and uranium in groundwater at concentrations that exceed drinking-water standards is a concern because of the potential adverse effects on human health. Some early studies of arsenic occurrence in groundwater considered anthropogenic causes, but more recent studies have focused on sources of naturally occurring arsenic to groundwater, such as minerals within aquifer materials that are in contact with groundwater. Arsenic and uranium in groundwater in New England have been shown to have a strong association to the geologic setting and nearby streambed sediment concentrations. In New Hampshire and Massachusetts, arsenic and uranium concentrations greater than human-health benchmarks have shown distinct spatial patterns when related to the bedrock units mapped at the local scale.The Connecticut Department of Public Health (DPH) reported that there are about 322,600 private wells in Connecticut serving approximately 823,000 people, or 23 percent of the State’s population. The State does not require that existing private wells be routinely tested for arsenic, uranium, or other contaminants; consequently, private wells are only sampled at the well owner’s discretion or when they are newly constructed. The U.S. Geological Survey (USGS), in cooperation with the DPH, completed an assessment in 2016 on the distribution of concentrations of arsenic and uranium in groundwater from bedrock in Connecticut. This report presents the major findings for arsenic and uranium concentrations from water samples collected from 2013 to 2015 from private wells.
Business System Planning Project, Preliminary System Design
International Nuclear Information System (INIS)
EVOSEVICH, S.
2000-01-01
CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time
The Effect of School Improvement Planning on Student Achievement
Huber, David J.; Conway, James M.
2015-01-01
This study evaluated the hypothesis that schools in Connecticut's Alliance Districts (lowest-performing districts) with higher-quality school improvement plans (SIPs) would have higher levels of student achievement. An exploratory research question evaluated whether SIPs predicted achievement of particular subgroups. SIPs were obtained and scored…
National Ignition Facility project acquisition plan revision 1
International Nuclear Information System (INIS)
Clobes, A.R.
1996-01-01
The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility M Project. It was prepared for the NIP Prood Office by the NIF Procurement Manager
Energy Technology Data Exchange (ETDEWEB)
Busack, Craig A. (Washington Department of Fish and Wildlife, Olympia, WA); Watson, Bruce; Johnston, Mark (Confederated Tribes and Bands of the Yakama Nation, Fisheries Resource Management, Toppenish, WA)
1997-08-01
The Yakima Fisheries Project (YFP), a key element in the Northwest Power Planning Council's Fish and Wildlife Program, has been in planning for more than ten years. It was initially conceived as, and is still intended to be, a multipurpose project. Besides increasing fish production in the Yakima basin, it is also intended to yield information about supplementation that will be of value to the entire Columbia basin, and hopefully the entire region. Because of this expectation of increased knowledge resulting from the project, a large and comprehensive monitoring program has always been seen as an integral part of the project. Despite the importance of monitoring to the project, monitoring planning has been slow to develop. The only general written statement of monitoring planning for the project is Chapter 9 of the current Project Status Report (PSR), written in 1993. That document is a reasonably good overview, and presents some important basic principles of monitoring, but is decidedly lacking in specifics. Throughout 1996 the Monitoring Implementation and Planning Team (MIPT), an interdisciplinary group of biologists who have worked on the project for several years, worked to develop a comprehensive spring chinook monitoring plan for the project. The result is the present document.
Energy Technology Data Exchange (ETDEWEB)
Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)
2012-07-01
Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)
Project Execution Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)
International Nuclear Information System (INIS)
VAN BEEK, J.E.
2000-01-01
This Project Execution Plan documents the methodology for managing Project W-211. Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for the future waste treatment plant, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AN-102, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the River Protection Project (RF'P) Waste Treatment Facility and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump-based retrieval system for any DST. This Project Execution Plan (PEP), derived from the predecessor Project Management Plan, documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering
First-of-A-Kind Control Room Modernization Project Plan
Energy Technology Data Exchange (ETDEWEB)
Thomas, Kenneth David [Idaho National Lab. (INL), Idaho Falls, ID (United States)
2016-02-01
This project plan describes a comprehensive approach to the design of an end-state concept for a modernized control room for Palo Verde. It describes the collaboration arrangement between the DOE LWRS Program Control Room Modernization Project and the APS Palo Verde Nuclear Generating Station. It further describes the role of other collaborators, including the Institute for Energy Technology (IFE) and the Electric Power Research Institute (EPRI). It combines advanced tools, methodologies, and facilities to enable a science-based approach to the validation of applicable engineering and human factors principles for nuclear plant control rooms. It addresses the required project results and documentation to demonstrate compliance with regulatory requirements. It describes the project tasks that will be conducted in the project, and the deliverable reports that will be developed through these tasks. This project plan will be updated as new tasks are added and as project milestones are completed. It will serve as an ongoing description on the project both for project participants and for industry stakeholders.
Resource Constrained Planning of Multiple Projects with Separable Activities
Fujii, Susumu; Morita, Hiroshi; Kanawa, Takuya
In this study we consider a resource constrained planning problem of multiple projects with separable activities. This problem provides a plan to process the activities considering a resource availability with time window. We propose a solution algorithm based on the branch and bound method to obtain the optimal solution minimizing the completion time of all projects. We develop three methods for improvement of computational efficiency, that is, to obtain initial solution with minimum slack time rule, to estimate lower bound considering both time and resource constraints and to introduce an equivalence relation for bounding operation. The effectiveness of the proposed methods is demonstrated by numerical examples. Especially as the number of planning projects increases, the average computational time and the number of searched nodes are reduced.
Project Management Plan to Maintain Safe and Compliant Conditions at the Plutonium Finishing Plant
International Nuclear Information System (INIS)
COX, G.J.
1999-01-01
This Project Management Plan presents the overall plan, description, mission, and workscope for the Plutonium Finishing Plant (PFP) maintain safe and compliant conditions project at PFP. This plan presents the overall description, mission, work scope, and planning for the Plutonium Finishing Plant (PFP) Maintain Safe and Compliant Conditions Project at PFP. This project includes all tasks required to maintain the safety boundary for the PFP Complex, except for the 2736-2 Vault Complex and the 234-52 vaults and vault-type rooms. The intent of this plan is to describe how this project will be managed and integrated with the stabilization, and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines that will manage the execution of this project. It describes the organizational approach and roles/responsibilities implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action
Quinault Indian Nation Comprehensive Biomass Strategic Planning Project
Energy Technology Data Exchange (ETDEWEB)
Cardenas, Jesus [American Community Enrichment, Elma, WA (United States)
2015-03-31
The overall purposes of the Quinault Indian Nation’s Comprehensive Biomass Strategic Planning Project were to: (1) Identify and confirm community and tribal energy needs; (2) Conducting an inventory of sustainable biomass feedstock availability; (3) Development of a biomass energy vision statement with goals and objectives; (4) Identification and assessment of biomass options for both demand-side and supply side that are viable to the Quinault Indian Nation (QIN); and (5) Developing a long-term biomass strategy consistent with the long-term overall energy goals of the QIN. This Comprehensive Biomass Strategic Planning Project is consistent with the QIN’s prior two-year DOE Renewable Energy Study from 2004 through 2006. That study revealed that the most viable options to the QIN’s renewable energy options were biomass and energy efficiency best practices. QIN's Biomass Strategic Planning Project is focused on using forest slash in chipped form as feedstock for fuel pellet manufacturing in support of a tribal biomass heating facility. This biomass heating facility has been engineered and designed to heat existing tribal facilities as well as tribal facilities currently being planned including a new K-12 School.
Goodheart, Lawrence B
2017-12-01
A current situation in Connecticut of whether a violent insane acquittee should be held in a state prison or psychiatric facility raises difficult issues in jurisprudence and medical ethics. Overlooked is that the present case of Francis Anderson reiterates much of the debate over rationalization of policy during the formative nineteenth century. Contrary to theories of social control and state absolutism, governance in Connecticut was largely episodic, indecisive and dilatory over much of the century. The extraordinary urban and industrial transformation at the end of the Gilded Age finally forced a coherent response in keeping with longstanding legal and medical perspectives.
Fast Flux Test Facility project plan. Revision 2
Energy Technology Data Exchange (ETDEWEB)
Hulvey, R.K.
1995-11-01
The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.
Fast Flux Test Facility project plan. Revision 2
International Nuclear Information System (INIS)
Hulvey, R.K.
1995-11-01
The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition
Digital Learning Compass: Distance Education State Almanac 2017. Connecticut
Seaman, Julia E.; Seaman, Jeff
2017-01-01
This brief report uses data collected under the U.S. Department of Education's National Center for Educational Statistics (NCES) Integrated Postsecondary Education Data System (IPEDS) Fall Enrollment survey to highlight distance education data in the state of Connecticut. The sample for this analysis is comprised of all active, degree-granting…
A planning and scheduling system for the LHC project
Bachy, Gérard; Tarrant, M
1995-01-01
The purpose of this paper is to present modern ways to manage time, resources and progress in a large-scale project. Over the last ten years, new project management techniques and tools have appeared such as concurrent engineering, Continuous Acquisition Lifecycle Support (CALS) and Engineering Data Management System (EDMS). The world downturn of the early 90s influenced project management: increasing constraints on time and budget and more external direction on spending that, for example, requires sophisticated sub-contracting practises. However, the evolution of the software and hardware market makes project control tools cheaper and easier to use. All project groups want to have their scope of work considered as complete projects and to control them themselves. This has several consequences on project staff behaviour concerning project control, and has to be taken into account in every planning process designed today. The system described will be at the heart of the planning and scheduling procedures issue...
LaRocco, Diana J.; Nestler-Rusack, Donna; Freiberg, Jo Ann
2007-01-01
Background: In June 2002, the State of Connecticut General Assembly (CGA) passed Public Act 02-119, An Act Concerning Bullying Behavior in Schools and Concerning the Pledge of Allegiance. Section 1 mandated that each local and regional board of education (school district) develop a policy to address bullying in its schools. Conn. Gen. Statute…
Quality assurance program plan for cesium legacy project
International Nuclear Information System (INIS)
Tanke, J.M.
1997-01-01
This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Cesium Legacy Project. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP). These activities include all aspects of cask transportation, project related operations within the 324 Building, and waste management as it relates to the specific activities of this project. General facility activities (i.e. 324 Building Operations, Central Waste Complex Operations, etc.) are covered in other appropriate QAPPs. The 324 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a B and W Hanford Company (BWHC) managed facility. During this transition process existing PNNL procedures and documents will be utilized until replaced by BWHC procedures and documents
Project Management Plan (PMP) for Work Management Implementation
International Nuclear Information System (INIS)
SHIPLER, C.E.
2000-01-01
The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system
AMADEUS Project Deliverable 1.2: Data Management Plan
Ana Belén Cristobal
2018-01-01
This document describes the initial Data Management Plan (DMP) for AMADEUS project. It addresses Project administration data collected as part of the execution and management of a disruptive research that could be in the market in the incoming years.
Wind energy planning in England, Wales and Denmark: Factors influencing project success
International Nuclear Information System (INIS)
McLaren Loring, Joyce
2007-01-01
Land-use planning poses a significant barrier to the further development of on-shore wind energy in many countries. There has been increasing discussion regarding the use of public participation in the planning process in order to address concerns of local residents and ease conflicts. This research explores the dynamics of the planning process for wind energy in England, Wales and Denmark in order to better understand the factors influencing project success. Through 18 in-depth case studies, it investigates the degree of local community participation in the planning process and the stability of the network of individuals and organisations involved in the project to determine their relationship to the public's acceptance of the project and the planning outcome. The study draws on the frameworks of public participation in planning and actor-network theories in order to develop indicators of the level of community involvement and network formation for each case. The analysis discusses predictions made by the theoretical approaches as to the importance of these variables to the success of new projects. The results indicate that projects with high levels of participatory planning are more likely to be publicly accepted and successful. In addition, stable supporting networks are more likely to form. The presence of a stable network of supporters is not found to be related to project acceptance and success; however, the absence of a stable network of opponents is found to be necessary for project acceptance and success in receiving planning permission
Energy Technology Data Exchange (ETDEWEB)
Field, M T; Truesdell, D B
1982-09-01
The Albany 1/sup 0/ x 2/sup 0/ Quadrangle, Massachusetts, New York, Connecticut, Vermont, and New Hampshire, was evaluated to a depth of 1500 m for uranium favorability using National Uranium Resource Evaluation criteria. Areas of favorable geology and aeroradioactivity anomalies were examined and sampled. Most Triassic and Jurassic sediments in the Connecticut Basin, in the central part of the quadrangle, were found to be favorable for sandstone uranium deposits. Some Precambrian units in the southern Green Mountains of Vermont were found favorable for uranium deposits in veins in metamorphic rocks.
International Nuclear Information System (INIS)
Field, M.T.; Truesdell, D.B.
1982-09-01
The Albany 1 0 x 2 0 Quadrangle, Massachusetts, New York, Connecticut, Vermont, and New Hampshire, was evaluated to a depth of 1500 m for uranium favorability using National Uranium Resource Evaluation criteria. Areas of favorable geology and aeroradioactivity anomalies were examined and sampled. Most Triassic and Jurassic sediments in the Connecticut Basin, in the central part of the quadrangle, were found to be favorable for sandstone uranium deposits. Some Precambrian units in the southern Green Mountains of Vermont were found favorable for uranium deposits in veins in metamorphic rocks
Weatherization Makes Headlines in Connecticut: Weatherization Assistance Close-Up Fact Sheet
International Nuclear Information System (INIS)
2001-01-01
Connecticut demonstrates its commitment to technology and efficiency through the Weatherization Program. Weatherization uses advanced technologies and techniques to reduce energy costs for low-income families by increasing the energy efficiency of their homes
Weatherization Makes Headlines in Connecticut: Weatherization Assistance Close-Up Fact Sheet
Energy Technology Data Exchange (ETDEWEB)
D& R International
2001-10-10
Connecticut demonstrates its commitment to technology and efficiency through the Weatherization Program. Weatherization uses advanced technologies and techniques to reduce energy costs for low-income families by increasing the energy efficiency of their homes.
Annual State of Connecticut Obstetrics and Gynecology Resident Research Day.
Seagle, Brandon-Luke L; Ballard, Jennifer; Kakar, Freshta; Panarelli, Erin; Samuelson, Robert; Shahabi, Shohreh
2015-01-01
To increase opportunities for Obstetrics and Gynecology(Ob/Gyn) residents to present their research, an Annual State of Connecticut Ob/Gyn Resident Research Day (RRD) was created. At the first annual RRD, 33 residents, representing five of six Connecticut Ob/Gyn residency programs, presented 39 poster and eight oral presentations. RRD evaluators rated the overall symposium and the quality of resident oral and poster presentations as either "excellent" or "above average." Residency program directors reported that the symposium was "very helpful" for evidencing resident scholarship as required by the Accreditation Council for Graduate Medical Education (ACGME). Surveyed residents reported that the symposium promoted their research and was a valuable investment of their time. An annual specialty-specific, statewide RRD was created, experienced good participation, and was well evaluated. The annual, statewide Ob/Gyn RRD may serve as a model for development of other specialty-specific, statewide RRD events.
In Connecticut: improving patient medication management in primary care.
Smith, Marie; Giuliano, Margherita R; Starkowski, Michael P
2011-04-01
Medications are a cornerstone of the management of most chronic conditions. However, medication discrepancies and medication-related problems-some of which can cause serious harm-are common. Pharmacists have the expertise to identify, resolve, monitor, and prevent these problems. We present findings from a Centers for Medicare and Medicaid Services demonstration project in Connecticut, in which nine pharmacists worked closely with eighty-eight Medicaid patients from July 2009 through May 2010. The pharmacists identified 917 drug therapy problems and resolved nearly 80 [corrected] percent of them after four encounters. The result was an estimated annual saving of $1,123 per patient on medication claims and $472 per patient on medical, hospital, and emergency department expenses-more than enough to pay for the contracted pharmacist services. We recommend that the Center for Medicare and Medicaid Innovation support the evaluation of pharmacist-provided medication management services in primary care medical homes, accountable care organizations, and community health and care transition teams, as well as research to explore how to enhance team-based care.
Environmental Restoration Project - Systems Engineering Management Plan
International Nuclear Information System (INIS)
Anderson, T.D.
1998-06-01
This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0
Achieving Smart Energy Planning Objectives. The Approach of the Transform Project
Directory of Open Access Journals (Sweden)
Ilaria Delponte
2014-05-01
Full Text Available Cities play a dual role in the field of energy and integrated planning. They function as institutional planning and decision making bodies and interfere as actors, e.g. as project developers or launching customers. In the first case their attempts at integrated plans are often unsuccessful in integrating vision, goals and instruments of all stakeholders so that waste, water, energy cycles, urban planning and budgets proceed with no connection to each other. TRANSFORM Project “Transformation Agenda for Low Carbon Cities” (FP7 tries to improve the integrated energy policy and decision making process of cities, both at a strategic and operational level, by providing the cities with a framework based on overall planning experiences and on-the-field projects and qualitative and quantitative analysis support models. The project intends also to make a step further in the quality of research, by providing a replicable and tested framework for the production of a strategic Transformation Agenda for the city as a whole, combined with district Implementation Plans.
78 FR 63481 - Therapeutic Area Standards Initiative Project Plan; Availability
2013-10-24
... disadvantages of current and emerging alternatives for the exchange of regulated study data, and (2) issuing a... primary document for guiding all major aspects of FDA's multi-year initiative to develop and implement TA... is announcing the availability of the TA Project Plan. This TA Project Plan will be the primary...
Automated transportation management system (ATMS) software project management plan (SPMP)
Energy Technology Data Exchange (ETDEWEB)
Weidert, R.S., Westinghouse Hanford
1996-05-20
The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.
Strategic planning for remediation projects
International Nuclear Information System (INIS)
Tapp, J.W.
1995-01-01
Remediation projects may range from a single leaking storage tank to an entire plant complex or producing oil and gas field. Strategic planning comes into play when the contamination of soil and groundwater is extensive. If adjacent landowners have been impacted or the community at large is concerned about the quality of drinking water, then strategic planning is even more important. (1) To manage highly complex interrelated issues--for example, the efforts expended on community relations can alter public opinion, which can impact regulatory agency decisions that affect cleanup standards, which can...and so on. (2) To ensure that all potential liabilities are managed--for example, preparation for the defense of future lawsuits is essential during site investigation and remediation. (3) To communicate with senior management--when the remediation team provides a strategic plan that includes both technical and business issues, senior management has the opportunity to become more involved and make sound policy decisions. The following discusses the elements of a strategic plan, who should participate in it, and the issues that should be considered
Evolution of project planning tools in a matrix organization
Energy Technology Data Exchange (ETDEWEB)
Furaus, J.P.; Figueroa-McInteer, C.; McKeever, P.S.; Wisler, D.B. [Sandia National Labs., Albuquerque, NM (United States); Zavadil, J.T. [Infomatrix (United States)
1996-10-01
Until recently, the Corporate Construction Program at Sandia was experiencing difficulties in managing projects: poor planning and cost estimating caused schedule and budget problems. The first step taken was a Microsoft {reg_sign} Project schedule that provides a standard template for scheduling individual construction projects. It is broken down according to the life cycle of the project and prevents the project team from leaving out an important item. A WBS (work breakdown structure) dictionary was also developed that describes how capital and operating funds are used to develop, design, construct, equip, and manage projects. We also developed a matrix chart that maps the planning guide against the major types of construction projects at Sandia. The guide, dictionary, and matrix chart offer enough flexibility that the project manager can make choices about how to structure work, yet ensure that all work rolls up to the cost categories and key DOE WBS elements. As requirements change, the tools can be updated; they also serve as training tools for new project team members.
Standard Measurement & Verification Plan for Lighting Equipment Retrofit or Replacement Projects
Energy Technology Data Exchange (ETDEWEB)
Richman, Eric E.
2009-11-04
This document provides a framework for a standard Measurement and Verification (M&V) plan for lighting projects. It was developed to support cost-effective retrofits (partial and complete replacements) of lighting systems and is intended to provide a foundation for an M&V plan for a lighting retrofit utilizing a "best practice" approach, and to provide guidance to site owners, contractors, and other involved organizations on what is essential for a robust M&V plan for lighting projects. This document provides examples of appropriate elements of an M&V plan, including the calculation of expected energy savings. The standard M&V plan, as provided, also allows for consistent comparison with other similar lighting projects. Although intended for lighting retrofit applications, M&V plans developed per this framework document may also be used for other non-lighting technology retrofits and new installations.
Solid waste information and tracking system server conversion project management plan
International Nuclear Information System (INIS)
MAY, D.L.
1999-01-01
The Project Management Plan governing the conversion of Solid Waste Information and Tracking System (SWITS) to a client-server architecture. The Solid Waste Information and Tracking System Project Management Plan (PMP) describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion will be released as supporting documents
A hierarchical approach to multi-project planning under uncertainty
Leus, R.; Wullink, Gerhard; Hans, Elias W.; Herroelen, W.
2004-01-01
We survey several viewpoints on the management of the planning complexity of multi-project organisations under uncertainty. A positioning framework is proposed to distinguish between different types of project-driven organisations, which is meant to aid project management in the choice between the
A hierarchical approach to multi-project planning under uncertainty
Hans, Elias W.; Herroelen, W.; Wullink, Gerhard; Leus, R.
2007-01-01
We survey several viewpoints on the management of the planning complexity of multi-project organisations under uncertainty. Based on these viewpoints we propose a positioning framework to distinguish between different types of project-driven organisations. This framework is meant to aid project
N Area Final Project Program Plan
International Nuclear Information System (INIS)
Day, R.S.; Duncan, G.M; Trent, S.J.
1998-07-01
The N Area Final Project Program Plan is issued for information and use by the U.S. Department of Energy (DOE), the Environmental Restoration Contractor (ERC) for the Hanford Site, and other parties that require workscope knowledge for the deactivation of N Reactor facilities and remediation of the 100-N Area. This revision to the program plan contains the updated critical path schedule to deactivate N Reactor and its supporting facilities, cleanout of the N Reactor Fuel Storage Basin (105-N Basin), and remediate the 100-N Area. This document reflects notable changes in the deactivation plan for N Reactor, including changes in deactivation status, the N Basin cleanout task, and 100-N Area remediation
International Nuclear Information System (INIS)
1995-04-01
The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S ampersand M) and as quickly and economically as possible. Implementation and completion of the deactivation project will further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S ampersand M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities, that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project
The Utilization of Inquiry-Based Science Instruction in Connecticut
Bozzuto, David M.
The purpose of this study was to explore the perspectives of practitioners of inquiry-based instruction from 35 Connecticut school districts. The source of the participants, Connecticut State Science Assessment Advisory Committee members, and their involvement in science education acted to bound the research. Using a multiple case study design, data were gathered from 28 participants: teachers n = 21, curriculum leaders n = 4, professional development experts n = 2, and state education advisor/ teacher preparation expert n = 1 involved with Connecticut schools. Each participant was asked to complete an online demographic and inquiry utilization questionnaire. From the results of the questionnaires, a cadre of 11 participants was selected to participate in semi-structured interviews. A round of follow-up interviews of five key participants was conducted to further clarify the phenomenon. Two of the follow up interviewees were observed using the EQUIP rubric to assess inquiry implementation. Artifacts such as minutes, PowerPoint presentations, and a reflexive journal were collected throughout the study. An inductive approach to content analysis of data from the survey and interviews was used to explore constructs, themes, and patterns. After segmentation took place, the data were categorized to allow patterns and constructs to emerge. The data were reduced based on the emergent design and those reductions, or themes, were informed by ongoing data collection using constant comparison as different levels of codes emerge. Data collection further informed data analysis and future data collection. Initial coding of patterns was reduced until theoretical saturation occurred and the data allowed five thematic findings to emerge from the data. The five themes were: teach, process, impasse, develop, and support. The significance of each theme and its implication for practitioners and researchers were discussed and offered, respectively.
Energy Technology Data Exchange (ETDEWEB)
Berger, Matthew T.
1994-01-01
A study was conducted on the Hellsgate Winter Range Mitigation Project area, a 4,943 acre ranch purchased for mitigating some habitat losses associated with the original construction of Grand Coulee Dam and innundation of habitat by Lake Roosevelt. A Habitat Evaluation Procedure (HEP) study was used to determine habitat quality and quantity baseline data and future projections. Target species used in the study were sharp-tailed grouse (Tympanuchus phasianellus), mule deer (Odocoileus hemoinus), mink (Mustela vison), spotted sandpiper (Actiius colchicus), bobcat (Felis reufs), blue grouse (Dendragapus obscurus), and mourning dove (Zenaida macroura). From field data collected, limiting life values or HSI's (Habitat Suitability Index's) for each indicator species was determined for existing habitats on project lands. From this data a long term management plan was developed. This report is designed to provide guidance for the management of project lands in relation to the habitat cover types discussed and the indicator species used to evaluate these cover types. In addition, the plan discusses management actions, habitat enhancements, and tools that will be used to enhance, protect and restore habitats to desired conditions. Through planned management actions biodiversity and vegetative structure can be optimized over time to reduce or eliminate, limiting HSI values for selected wildlife on project lands.
Evaluation of Urban Planning Projects Criteria Using Fuzzy AHP Technique
Directory of Open Access Journals (Sweden)
Walid Mustafa Kamas
2017-05-01
Full Text Available In this research, Fuzzy Analytic Hierarchy Process technique is applied (Fuzzy AHP which is one of multi-criteria decision making techniques to evaluate the criteria for urban planning projects, the project of developing master plan of Al-Muqdadiyah city to 2035 has been chosen as a case study. The researcher prepared a list of criteria in addition to the authorized departments criteria and previous researches in order to choose optimized master plan according to these criteria. This research aims at employing the foundations of (Fuzzy AHP technique in evaluating urban planning criteria precisely and flexible. The results of the data analysis to the individuals of the sample who are specialists, in this aspect. The land use criteria are more important than the rest of the criteria in these projects, where it received the relative importance with percentile (42.1 %.
Software for project-based learning of robot motion planning
Moll, Mark; Bordeaux, Janice; Kavraki, Lydia E.
2013-12-01
Motion planning is a core problem in robotics concerned with finding feasible paths for a given robot. Motion planning algorithms perform a search in the high-dimensional continuous space of robot configurations and exemplify many of the core algorithmic concepts of search algorithms and associated data structures. Motion planning algorithms can be explained in a simplified two-dimensional setting, but this masks many of the subtleties and complexities of the underlying problem. We have developed software for project-based learning of motion planning that enables deep learning. The projects that we have developed allow advanced undergraduate students and graduate students to reflect on the performance of existing textbook algorithms and their own variations on such algorithms. Formative assessment has been conducted at three institutions. The core of the software used for this teaching module is also used within the Robot Operating System, a widely adopted platform by the robotics research community. This allows for transfer of knowledge and skills to robotics research projects involving a large variety robot hardware platforms.
Supported Employment in Connecticut: An Examination of Integration and Wage Outcomes.
Helms, Barbara L.; And Others
1991-01-01
Study of a sample of 93 individuals with disabilities participating in supported employment programs in Connecticut found that monthly wages and levels of integration increased significantly when compared to working situations prior to supported employment placement. (JDD)
Intermediate evaluation of USAID/Cairo energy policy planning project
Energy Technology Data Exchange (ETDEWEB)
Wilbanks, T.J.; Wright, S.B. (Oak Ridge National Lab., TN (United States)); Barron, W.F. (Hong Kong Univ. (Hong Kong)); Kamel, A.M. (Ain Shams Univ., Cairo (Egypt)); Santiago, H.T. (USDOE, Washington, DC (United States))
1992-01-01
Three years ago, a team from the Oak Ridge National Laboratory and the Oak Ridge Associated Universities, supplemented by an expert from the US Department of Energy and a senior Egyptian energy professional, carried out what was termed an intermediate evaluation'' of a major energy policy project in Egypt. Supported by USAID/Cairo, the project had concentrated on developing and strengthening an Organization for Energy Planning (OEP) within the Government of India, and it was actually scheduled to end less than a year after this evaluation. The evaluation was submitted to USAID/Cairo and circulated elsewhere in the US Agency for International Development and the Government of Egypt as an internal report. Over the next several years, the USAID energy planning project ended and the functions performed by OEP were merged with planning capabilities in the electric power sector. Now that the major issues addressed by the evaluation report have been resolved, we are making it available to a broader audience as a contribution to the general literature on development project evaluation and institution-building.
Intermediate evaluation of USAID/Cairo energy policy planning project
Energy Technology Data Exchange (ETDEWEB)
Wilbanks, T.J.; Wright, S.B. [Oak Ridge National Lab., TN (United States); Barron, W.F. [Hong Kong Univ. (Hong Kong); Kamel, A.M. [Ain Shams Univ., Cairo (Egypt); Santiago, H.T. [USDOE, Washington, DC (United States)
1992-09-01
Three years ago, a team from the Oak Ridge National Laboratory and the Oak Ridge Associated Universities, supplemented by an expert from the US Department of Energy and a senior Egyptian energy professional, carried out what was termed an ``intermediate evaluation`` of a major energy policy project in Egypt. Supported by USAID/Cairo, the project had concentrated on developing and strengthening an Organization for Energy Planning (OEP) within the Government of India, and it was actually scheduled to end less than a year after this evaluation. The evaluation was submitted to USAID/Cairo and circulated elsewhere in the US Agency for International Development and the Government of Egypt as an internal report. Over the next several years, the USAID energy planning project ended and the functions performed by OEP were merged with planning capabilities in the electric power sector. Now that the major issues addressed by the evaluation report have been resolved, we are making it available to a broader audience as a contribution to the general literature on development project evaluation and institution-building.
Not-for-profit hospital CEO performance and pay: some evidence from Connecticut.
Kramer, Jeffrey; Santerre, Rexford E
2010-01-01
This paper uses observations from a panel data set of 35 chief executive officers (CEOs) from 29 not-for-profit hospitals in Connecticut over the period 1998 to 2006 to investigate the relationship between CEO performance and pay. Both economic and charity performance measures are specified in the empirical model. The multiple regression results reveal that not-for-profit hospital CEOs, at least in Connecticut, are driven at the margin to increase the occupancy rate of privately insured patients at the expense of uncompensated care and public-pay patients. This type of behavior on the part of not-for-profit hospital CEOs calls into question the desirability of allowing these hospitals a tax exemption on earned income, property, and purchases.
Using project management methodology to plan and track inpatient care.
Kaufman, Darren S
2005-08-01
Effective care of each patient throughout a hospital admission involves executing a specific set of tasks to produce a favorable outcome within an appropriate time frame. The ProjectRounds methodology, which can be implemented using widely available software, incorporates the principles of project management in planning and control hospital inpatient care. It consists of four stages--clinical assessment, planning, scheduling, and tracking. OVERVIEW OF PROJECTROUNDS AND EXAMPLE: As an example, a 68-year-old-man is admitted with pneumonia. In clinical assessment, the admitting physician uses an assessment tool that prompts her to list all the patient's clinical issues, define the conditions that need to be met to discharge the patient, highlight special problems, and list any consultations, diagnostic tests, and procedures that are planned. In planning, the work breakdown structure--a tabulation of all the tasks in the "project" (the admission)--is created. In scheduling, a project schedule is generated, and in tracking, the clinical team evaluates and monitors the project's course. During interdisciplinary clinical rounds, the progress of the patient's hospital care can be tracked and quantified by employing the percent complete method. Tracking can be used as a "dashboard," providing a concise summary of the care that needs to be and has been rendered to the patient. Applying the tenets of project management can optimize the process of providing health care to hospital inpatients.
Transition plan: Project C-018H, 200-E Area Effluent Treatment Facility
International Nuclear Information System (INIS)
Connor, M.D.
1994-01-01
The purpose of this transition plan is to ensure an orderly transfer of project information to operations to satisfy Westinghouse Hanford Company (WHC) operational requirements and objectives, and ensure safe and efficient operation of Project C-018H, the 200-E Area Effluent Treatment Facility (ETF). This plan identifies the deliverables for Project C-018H upon completion of construction and turnover to WHC for operations, and includes acceptance criteria to objectively assess the adequacy of the contract deliverables in relation to present requirements. The scope of this plan includes a general discussion of the need for complete and accurate design basis documentation and design documents as project deliverables. This plan also proposes that a configuration management plan be prepared to protect and control the transferred design documents and reconstitute the design basis and design requirements, in the event that the deliverables and project documentation received from the contractor are less than adequate at turnover
Connecticut School Integration: Moving Forward as the Northeast Retreats
Orfield, Gary
2015-01-01
This report analyzes the data on changes in patterns of racial segregation and their education consequences over a quarter century, from l987 to 2012. It examines a major transition in the racial and ethnic composition of Connecticut and the changes in integration and segregation in the schools of the state and its urban communities and it…
78 FR 21414 - Central Valley Project Improvement Act, Water Management Plans
2013-04-10
... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review... establish and administer an office on Central Valley Project water conservation best management practices...
78 FR 63491 - Central Valley Project Improvement Act, Water Management Plans
2013-10-24
... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review: Westside... project contractors using best available cost-effective technology and best management practices.'' These...
Rhode Island, Connecticut, New York, and New Jersey ESI: INVERT (Invertebrate Polygons)
National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains sensitive biological resource data for marine, estuarine, and terrestrial invertebrate species in coastal Rhode Island, Connecticut, New York,...
Fish Consumption in Connecticut, Florida, Minnesota, and North Dakota (Final Report)
In August 2013, EPA announced the availability of the final report,Fish Consumption in Connecticut, Florida, Minnesota, and North Dakota. Many state and local health agencies throughout the United States conduct area-specific surveys that monitor and evaluate contaminant ...
Planning international transit oil pipeline projects in Croatia
International Nuclear Information System (INIS)
Sekulic, G.; Vrbic, D.
2004-01-01
Planning and development of international oil pipeline projects are aimed primarily at enhancing the safety of crude oil supply. Pipeline development is affected by a variety of overlapping factors, such as energy - and environment-protection-related factors, as well as political, economic, legislative, social, technical and technological ones. The success of any pipeline planning, construction and operation in the present conditions will depend upon the degree to which the above factors have been brought in line with global trends. The government should create stable political, economic and legislative frameworks that will meet the global requirements of crude oil transport development. As regards (new) transportation companies, their function is to secure safe transport by providing competitive tariffs and granting environmental protection. A prerequisite for the pipeline planning is to have both major crude oil consumers and producers (as well as their economic and political integrations) consider any state or company as potential partners for crude oil transport and transit, respectively. Croatia and the JANAF transport company have been 'chosen' as one of priority routes for European supply with crude oil from the Caspian region and Russia and one of the directions for Russian crude oil export due to a number of advantages, opportunities and prospects for a successful development. Two international oil pipeline projects - the Druzba Adria Project and the Constanta-Pancevo-Omisalj-Trieste Project - are currently under consideration. The government commitment towards these projects has been documented by the Croatian Energy Development Strategy (April 2002) and by the Programme for its implementation (March 2004). JANAF has assumed the responsibility for carrying out the project preparation activities assigned to it by the Croatian Government and the pertinent ministries. Cooperation between JANAF and government institutions is an integral part of the procedure
Rhode Island, Connecticut, New York, and New Jersey ESI: INVERTPT (Invertebrate Points)
National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains sensitive biological resource data for rare terrestrial invertebrates in coastal Rhode Island, Connecticut, New York, and New Jersey. Vector...
International Nuclear Information System (INIS)
1996-08-01
Purpose of the deactivation project is to place former isotopes production facilities at ORNL in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance. This management plan was prepared to document project objectives, define organizational relationships and responsibilities, and outline the management control systems. The project has adopted the strategy of deactivating the simple facilities first. The plan provides a road map for the quality assurance program and identifies other documents supporting the Isotopes Facilities Deactivation Project
Marine radioecology. Annual report 1996. Project plan 1997
International Nuclear Information System (INIS)
1997-06-01
The project plan for the EKO-1 project states that 'the main aim of the EKO-1 project is to enable faster and better assessments to be made of the effects of releases of radionuclides into the marine environment'. To meet this goal the main parts of the project were defined as follows: Model work - Identifying parameters of main interest including estimating and validating the values of these parameters; Research - Field studies, environments typical for various Nordic regions, environments with special physical or chemical characteristics. Laboratory studies; Dissemination of information - Seminars, reports, articles. During the project period emphasis has also been put on quality issues concerning sampling and analysis. The project work has progressed in accordance with project plans in 1996 and within the set budget. In modelling a parameter sensitivity analysis was carried out for a radiological assessment model used for the prediction of doses to man from dumping of radioactive waste in the Kara Sea. Doses to man were found to be generally dominated by contributions from long-lived transuranic radionuclides (plutonium and americium) which associate readily with sediments. Sediment related processes and parameters show therefore high sensitivities, especially at long distances (e.g. Barents Sea). Within the EKO-1 project there has been emphasis on encouraging the Nordic aspect of sediment research in spite of the limitations set by nationally run sampling projects. The EKO-1 project has managed this by e.g.: Organizing exchange of samples for analysis links with the EKO-2.3 project ('Limnic systems'). (EG) 52 refs
Effects of Road Salt on Connecticut's Groundwater: A Statewide Centennial Perspective.
Cassanelli, James P; Robbins, Gary A
2013-01-01
This study examined the extent to which development and road salting has affected Connecticut's groundwater. We gathered water quality data from different time periods between 1894 and the present and analyzed the data using maps generated with ESRI ArcGIS. Historical reports illustrate a statewide baseline trend of decreasing chloride concentration northward across the State (average, 2 ppm). Since then, statewide chloride concentrations in ground water have increased by more than an order of magnitude on average. Analysis indicates spatial correlation between chloride impacts and major roadways. Furthermore, increases in statewide chloride concentration parallel increases in road salt application. Projected trends suggest that statewide baseline concentrations will increase by an amount equal to five times background levels between the present and the year 2030. The analytical process outlined herein can be readily applied to any region to investigate salt impacts on large spatial and temporal scales. Copyright © by the American Society of Agronomy, Crop Science Society of America, and Soil Science Society of America, Inc.
Work plan for the Hanford Environmental Dose Reconstruction Project
Energy Technology Data Exchange (ETDEWEB)
1989-12-01
The primary objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that populations could have received from nuclear operations at the Hanford Site since 1944, with descriptions of uncertainties inherent in such estimates. The secondary objective is to make project records--information that HEDR staff members used to estimate radiation doses--available to the public. Preliminary dose estimates for a limited geographic area and time period, certain radionuclides, and certain populations are planned to be available in 1990; complete results are planned to be reported in 1993. Project reports and references used in the reports are available to the public in the DOE Public Reading Room in Richland, Washington. Project progress is documented in monthly reports, which are also available to the public in the DOE Public Reading Room.
Rhode Island, Connecticut, New York, and New Jersey ESI: FISH (Fish Polygons)
National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains sensitive biological resource data for marine, estuarine, and anadromous fish species in coastal Rhode Island, Connecticut, New York, and New...
QUEST2: Release 1: Project plan deliverable set
International Nuclear Information System (INIS)
Braaten, F.D.
1995-01-01
This Project Management Plan combines the project management deliverables from the P+ methodology which are applicable to Release 1 of the QUEST2 work. This consolidation reflects discussions with WHC QA regarding an appropriate method for ensuring that P+ deliverables fulfill the intent of WHC-CM-3-10 and QR-19
Automated Procurement System (APS): Project management plan (DS-03), version 1.2
Murphy, Diane R.
1994-01-01
The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.
Development of the digital design environment ProjectWise(TM) - phase 1.
2017-04-28
The goal of this research was to develop a project document management system capable of managing : Connecticut Department of Transportation (CTDOT) Capital Road and Bridge Program. Primary targets of : research and development included the system, c...
Project planning of Gen-IV sodium cooled fast reactor technology
Energy Technology Data Exchange (ETDEWEB)
Yoo, Jaewoon; Joo, H. K.; Cho, C. H.; Kim, Y. G.; Lee, D. U.; Jin, M. W.
2013-05-15
The project program will be established to shorten the design schedule by sharing the design man power and experimental facility, and by introducing the proven technology through international collaboration and the project plan including preliminary specific design, technology validation and fuel design validation plan will be more detail by reviewing the plan at the International Technical Review Meeting (ITRM). Periodic project progress review meeting will be held to find the technical issues and to resolve them. The results of the progress review meeting will be reflected into the final assessment of research project. The project progress review meeting will be held every quarter and external expert will also participate in the meeting. In parallel with the PGSFR development, innovative small modular SFR will be developed aiming to the international nuclear market. The system and component technologies of both system can be shared but innovative concept will be implemented into the design. Ultra long life core design concept and supercritical CO{sub 2} Brayton cycle will be considered as the innovative concept for enhancing the plant economy and safety.
Project planning of Gen-IV sodium cooled fast reactor technology
International Nuclear Information System (INIS)
Yoo, Jaewoon; Joo, H. K.; Cho, C. H.; Kim, Y. G.; Lee, D. U.; Jin, M. W.
2013-05-01
The project program will be established to shorten the design schedule by sharing the design man power and experimental facility, and by introducing the proven technology through international collaboration and the project plan including preliminary specific design, technology validation and fuel design validation plan will be more detail by reviewing the plan at the International Technical Review Meeting (ITRM). Periodic project progress review meeting will be held to find the technical issues and to resolve them. The results of the progress review meeting will be reflected into the final assessment of research project. The project progress review meeting will be held every quarter and external expert will also participate in the meeting. In parallel with the PGSFR development, innovative small modular SFR will be developed aiming to the international nuclear market. The system and component technologies of both system can be shared but innovative concept will be implemented into the design. Ultra long life core design concept and supercritical CO 2 Brayton cycle will be considered as the innovative concept for enhancing the plant economy and safety
International Nuclear Information System (INIS)
1995-12-01
This plan for the Gunite and Associated Tanks (GAAT) Treatability Studies Project satisfies the requirements of the program management plan for the Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program as established in the Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program. This plan is a subtier of several other ER documents designed to satisfy the US Department of Energy (DOE) Order 4700.1 requirement for major systems acquisitions. This project management plan identifies the major activities of the GAAT Treatability Studies Project; establishes performance criteria; discusses the roles and responsibilities of the organizations that will perform the work; and summarizes the work breakdown structure, schedule, milestones, and cost estimate for the project
Rhode Island, Connecticut, New York, and New Jersey ESI: FISHL (Fish Lines)
National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains sensitive biological resource data for anadromous fish species in coastal Rhode Island, Connecticut, New York, and New Jersey. Vector arcs in...
Rhode Island, Connecticut, New York, and New Jersey ESI: NESTS (Nest Points)
National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains sensitive biological resource data for nesting birds in coastal Rhode Island, Connecticut, New York, and New Jersey. Vector points in this...
Decommissioning plan - decommissioning project for KRR 1 and 2 (revised)
Energy Technology Data Exchange (ETDEWEB)
Jung, K. J.; Paik, S. T.; Chung, U. S.; Jung, K. H.; Park, S. K.; Lee, D. G.; Kim, H. R.; Kim, J. K.; Yang, S. H.; Lee, B. J
2000-10-01
This report is the revised Decommissioning Plan for the license of TRIGA research reactor decommissioning project according to Atomic Energy Act No. 31 and No. 36. The decommissioning plan includes the TRIGA reactor facilities, project management, decommissioning method, decontamination and dismantling activity, treatment, packaging, transportation and disposal of radioactive wastes. the report also explained the radiation protection plan and radiation safety management during the decommissioning period, and expressed the quality assurance system during the period and the site restoration after decommissioning. The first decommissioning plan was made by Hyundai Engineering Co, who is the design service company, was submitted to the Ministry of Science and Technology, and then was reviewed by the Korea Institute of Nuclear Safety. The first decommissioning plan was revised including answers for the questions arising from review process.
Decommissioning plan - decommissioning project for KRR 1 and 2 (revised)
International Nuclear Information System (INIS)
Jung, K. J.; Paik, S. T.; Chung, U. S.; Jung, K. H.; Park, S. K.; Lee, D. G.; Kim, H. R.; Kim, J. K.; Yang, S. H.; Lee, B. J.
2000-10-01
This report is the revised Decommissioning Plan for the license of TRIGA research reactor decommissioning project according to Atomic Energy Act No. 31 and No. 36. The decommissioning plan includes the TRIGA reactor facilities, project management, decommissioning method, decontamination and dismantling activity, treatment, packaging, transportation and disposal of radioactive wastes. the report also explained the radiation protection plan and radiation safety management during the decommissioning period, and expressed the quality assurance system during the period and the site restoration after decommissioning. The first decommissioning plan was made by Hyundai Engineering Co, who is the design service company, was submitted to the Ministry of Science and Technology, and then was reviewed by the Korea Institute of Nuclear Safety. The first decommissioning plan was revised including answers for the questions arising from review process
Energy Technology Data Exchange (ETDEWEB)
Childs, Allen B.
2002-03-01
This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is
International Nuclear Information System (INIS)
Bryan, W.E.; Oakley, L.B.
1993-04-01
This document summarizes the systems engineering assessment that was performed for the Mixed Waste Disposal Initiative (MWDI) Project to determine what types of documentation are required for the success of the project. The report also identifies the documents that will make up the MWDI Project Record and describes the Configuration Management Plan describes the responsibilities and process for making changes to project documentation
International Nuclear Information System (INIS)
1991-11-01
The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level
Achieving Sustainable Value Planning For Malaysian Public Projects
Directory of Open Access Journals (Sweden)
Muhammad Faudzi
2016-01-01
Full Text Available Sustainability is the central development issue in the modern economy. Through sustainable development, quality of life can be improved or maintained over time. Since Malaysia is targeting to become a high-income nation by the year 2020, financial investment in public projects should be planned comprehensively so that it will generate immediate and long-term benefits to the country and the people. Within the currently tight financial environment, achieving value for money in public spending is seen as one of the enablers to maintain the right momentum of economic growth. Previous studies have established the importance of integrating sustainability consideration into Value Planning protocol in order to achieve value for money, underpinned by the sustainable development agenda. Despite the establishment of the framework for the integration, the opportunity of such integration within the Malaysian Value Planning protocol for public projects remains unclear. The present state of sustainability consideration within the Value Planning practice should be first evaluated, so that potential interventions to enhance the integration can be introduced. Responding to the gap, this exploratory study was conducted. The data was collected by means of document analysis, interviews and observations; subsequently analysed using the Template Analysis technique. Based on the current practice of Value Planning in Malaysia, ten interventions are proposed to transform the present practice into Sustainable Value Planning. Sustainable Value Planning is seen as a comprehensive concept in achieving value for money in public spending underpinned by the overarching concept of sustainability
Up-Stream Dissolved Oxygen TMDL Project Quality Assurance ProjectPlan
Energy Technology Data Exchange (ETDEWEB)
Stringfellow, William T.
2005-05-13
A quality assurance project plan (QAPP) for the execution of an ecosystem level monitoring and research program examining algal ecology in highly impaired rivers. Procedures for executing both field and laboratory surface water quality and flow analysis are described. The procedures described here are compatible with the California Surface Water Ambient Monitoring program (SWAMP).
I-15 integrated corridor management system : project management plan.
2011-06-01
The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...
Project Delivery Acquisition and Contracting Plan for the Tank Farm Contractor
International Nuclear Information System (INIS)
MERCADO, L.C.
2000-01-01
This document is a plan presenting the process, strategies and approaches for vendor contracting by the Tank Farm Contractor. The plan focuses on contracting structures, practices, methods, and desired approaches in contracting. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has contracted with the CH2M HILL Hanford Group, Inc. (CHG), as the Tank Farm Contractor (TFC), to support vitrification of Hanford Site tank waste by the Privatization Contractor. During Waste Feed Delivery Phase 1, waste will be retrieved from certain double-shell tanks and delivered to the Privatization Contractor to meet contract feed delivery requirements. Near-term project goals include upgrading infrastructure systems; retrieving and delivering the waste; and accepting the waste packages for interim onsite storage and disposal. Project Delivery includes individual projects assigned to provide the infrastructure and systems responsible to provide engineering, design, procurement, installation/construction, and testing/turnover of systems for retrieval of waste from Hanford double-shell tanks. This plan sets the requirements for projects work scope, contracting practices, structures, methods, and performance measurements. The plan is designed to integrate Life-Cycle Projects acquisitions and provide a consistent contracting approach. This effort will serve as a step improvement in contract reform implementing commercial practices into DOE projects
Project summary plan for HTGR recycle reference facility
International Nuclear Information System (INIS)
Baxter, B.J.
1979-11-01
A summary plan is introduced for completing conceptual definition of an HTGR Recycle Reference Facility (HRRF). The plan describes a generic project management concept, often referred to as the requirements approach to systems engineering. The plan begins with reference flow sheets and provides for the progressive evolution of HRRF requirements and definition through feasibility, preconceptual, and conceptual phases. The plan lays end-to-end all the important activities and elements to be treated during each phase of design. Identified activities and elements are further supported by technical guideline documents, which describe methodology, needed terminology, and where relevant a worked example
Directory of Open Access Journals (Sweden)
Godwin Idoro
2012-11-01
Full Text Available This study compares the level of project planning on public andprivate sectors projects and its impact on performance. Thepurpose is to create awareness of the level and effectivenessof the planning done by public and private clients in the deliveryof construction projects. A questionnaire survey administeredto a sample of 130 client representatives selected by stratifi edrandom sampling from the population of public and private clientsin the Nigerian construction industry is used and analysed usingdescriptive statistics, the t-test and Spearman correlation test. Theresults show that the level of preconstruction planning on privatesector projects is higher than that of public sector projects whilethe level of contract planning done by the latter is higher thanthat of the former. Furthermore, the performance of private sectorprojects is higher than that of public sector projects in many of theparameters used. However, the level of preparation of life-cyclecharts that concern project delivery time in both public and privatesectors projects is low and the level of project planning in the twocategories of projects has a limited impact on project performance.The understanding of how public and private sectors projectsperform in planning and its impact are expected to assist publicand private clients to know the challenges ahead of them in theireffort to improve the planning and performance of their projects.
Spent Nuclear Fuel Project dose management plan
International Nuclear Information System (INIS)
Bergsman, K.H.
1996-03-01
This dose management plan facilitates meeting the dose management and ALARA requirements applicable to the design activities of the Spent Nuclear Fuel Project, and establishes consistency of information used by multiple subprojects in ALARA evaluations. The method for meeting the ALARA requirements applicable to facility designs involves two components. The first is each Spent Nuclear Fuel Project subproject incorporating ALARA principles, ALARA design optimizations, and ALARA design reviews throughout the design of facilities and equipment. The second component is the Spent Nuclear Fuel Project management providing overall dose management guidance to the subprojects and oversight of the subproject dose management efforts
Magnen, Andre
In many developing countries, the translation of political objectives to action projects is made difficult by the lack of training of staff of the ministry of education planning and managing units. This booklet deals with the implementation of these projects within the framework of the planning process. After defining projects, chapter 1 shows the…
FRG sealed isotopic heat sources project (C-229) project management plan
International Nuclear Information System (INIS)
Metcalf, I.L.
1997-01-01
This Project Management Plan defines the cost, scope, schedule, organizational responsibilities, and work breakdown structure for the removal of the Federal Republic of Germany (FRG) Sealed Isotopic Heat Sources from the 324 Building and placed in interim storage at the Central Waste Complex (CWC)
Sensemaking in Enterprise Resource Planning Project Deescalation: An Empirical Study
Battleson, Douglas Aloys
2013-01-01
Enterprise resource planning (ERP) projects, a type of complex information technology project, are very challenging and expensive to implement. Past research recognizes that escalation, defined as the commitment to a failing course of action, is common in such projects. While the factors that contribute to escalation (e.g., project conditions,…
Planning risk communication for UMTRA project groundwater restoration
Energy Technology Data Exchange (ETDEWEB)
Hundertmark, Charles [Jacobs Engineering Group Inc. and University of Phoenix (United States); Hoopes, Jack [Jacobs Engineering Group Inc. (United States); Flowers, Len [Roy F. Weston Company (United States); Jackson, David G [U.S. Department of Energy (United States)
1992-07-01
The U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is entering a new phase in which groundwater contamination will become a growing focus as surface remedial action draws toward completion. Planning for risk communication associated with the groundwater project will be a major factor in the successful initiation of the program. (author)
Planning risk communication for UMTRA project groundwater restoration
International Nuclear Information System (INIS)
Hundertmark, Charles; Hoopes, Jack; Flowers, Len; Jackson, David G.
1992-01-01
The U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is entering a new phase in which groundwater contamination will become a growing focus as surface remedial action draws toward completion. Planning for risk communication associated with the groundwater project will be a major factor in the successful initiation of the program. (author)
Pre-Project planning of Capital Facilities at NASA
Barrow, Benjamin John
1999-01-01
This thesis details the development of a NASA specific Project Definition Rating Index (PDRI) tool. This tool is to be used as a checklist for determining the necessary steps to follow in defining project scope and as a means to monitor progress and assess scope definition completeness at various stages during the NASA Pre-Project Planning process. This thesis also describes and identifies specific points in the NASA Capital Facility Programming Cycle for the performance of PDRI assessments ...
The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan
International Nuclear Information System (INIS)
Fix, Anne
2007-01-01
The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barrier at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory?s Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.
Cesium legacy safety project management work plan
International Nuclear Information System (INIS)
Durham, J.S.
1998-01-01
This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell)
Energy Technology Data Exchange (ETDEWEB)
Rosemann, Andreas [Gesellschaft fuer integrierte Systemplanung (GiS) mbH, Weinheim (Germany)
2014-05-15
In nuclear power plants it is common to carry out the technical planning of the annual outage work orders in an Enterprise Application Management (EAM) system and to schedule the outage tasks in a project planning tool. The reason for this is historical: Former EAM systems did not (or just to some extend) offer the necessary functionalities to realise the scheduling of the outage; graphical support for the planning was not provided at all. Consequently, scheduling the annual outage was performed in a separate planning tool. Modern Enterprise Application Management (EAM) software builds on established project planning tools with respect to the functionalities and timing of work orders. As a standard they provide editable charts as well as a lot of functionalities which are required for scheduling the annual outage. The functional gap between the demanded planning functionalities and the functionalities provided by the EAM system has been significantly reduced. Depending on the deployed software itself it is possible to extend the EAM system with little effort (in comparison to the promising advantages) so that external project timing planning tools are not required any more. By shifting towards an integrated planning tool, efficiency in planning an outage as well as the quality of communication of the current planning status increases. Furthermore, the basis of information for work orders by the control room staff and therefore safety can be enhanced. (orig.)
International Nuclear Information System (INIS)
Rosemann, Andreas
2014-01-01
In nuclear power plants it is common to carry out the technical planning of the annual outage work orders in an Enterprise Application Management (EAM) system and to schedule the outage tasks in a project planning tool. The reason for this is historical: Former EAM systems did not (or just to some extend) offer the necessary functionalities to realise the scheduling of the outage; graphical support for the planning was not provided at all. Consequently, scheduling the annual outage was performed in a separate planning tool. Modern Enterprise Application Management (EAM) software builds on established project planning tools with respect to the functionalities and timing of work orders. As a standard they provide editable charts as well as a lot of functionalities which are required for scheduling the annual outage. The functional gap between the demanded planning functionalities and the functionalities provided by the EAM system has been significantly reduced. Depending on the deployed software itself it is possible to extend the EAM system with little effort (in comparison to the promising advantages) so that external project timing planning tools are not required any more. By shifting towards an integrated planning tool, efficiency in planning an outage as well as the quality of communication of the current planning status increases. Furthermore, the basis of information for work orders by the control room staff and therefore safety can be enhanced. (orig.)
UMTRA project water sampling and analysis plan, Tuba City, Arizona
International Nuclear Information System (INIS)
1996-02-01
Planned, routine ground water sampling activities at the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Tuba City, Arizona, are described in the following sections of this water sampling and analysis plan (WSAP). This plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the stations routinely monitored at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the U.S. Environmental Protection Agency (EPA) regulations in 40 CFR Part 192 (1994) and the final EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), and the most effective technical approach for the site
Yakima Habitat Improvement Project Master Plan, Technical Report 2003.
Energy Technology Data Exchange (ETDEWEB)
Golder Associates, Inc.
2003-04-22
The Yakima Urban Growth Area (UGA) is a developing and growing urban area in south-central Washington. Despite increased development, the Yakima River and its tributaries within the UGA continue to support threatened populations of summer steelhead and bull trout as well as a variety of non-listed salmonid species. In order to provide for the maintenance and recovery of these species, while successfully planning for the continued growth and development within the UGA, the City of Yakima has undertaken the Yakima Habitat Improvement Project. The overall goal of the project is to maintain, preserve, and restore functioning fish and wildlife habitat within and immediately surrounding the Yakima UGA over the long term. Acquisition and protection of the fish and wildlife habitat associated with key properties in the UGA will prevent future subdivision along riparian corridors, reduce further degradation or removal of riparian habitat, and maintain or enhance the long term condition of aquatic habitat. By placing these properties in long-term protection, the threat of development from continued growth in the urban area will be removed. To most effectively implement the multi-year habitat acquisition and protection effort, the City has developed this Master Plan. The Master Plan provides the structure and guidance for future habitat acquisition and restoration activities to be performed within the Yakima Urban Area. The development of this Master Plan also supports several Reasonable and Prudent Alternatives (RPAs) of the NOAA Fisheries 2000 Biological Opinion (BiOp), as well as the Water Investment Action Agenda for the Yakima Basin, local planning efforts, and the Columbia Basin Fish and Wildlife Authority's 2000 Fish and Wildlife Program. This Master Plan also provides the framework for coordination of the Yakima Habitat Improvement Project with other fish and wildlife habitat acquisition and protection activities currently being implemented in the area. As a
Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.
2011-01-01
The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.
NIF Projects Controls and Information Systems Software Quality Assurance Plan
Energy Technology Data Exchange (ETDEWEB)
Fishler, B
2011-03-18
Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.
NIF Projects Controls and Information Systems Software Quality Assurance Plan
International Nuclear Information System (INIS)
Fishler, B.
2011-01-01
Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.
Social Vulnerability Index (SoVI) for Connecticut based on 2000 Census Block Groups
National Oceanic and Atmospheric Administration, Department of Commerce — This data depicts the social vulnerability of Connecticut census block groups to environmental hazards. Data were culled primarily from the 2000 Decennial Census.
Spent Nuclear Fuel project systems engineering management plan
International Nuclear Information System (INIS)
Womack, J.C.
1995-01-01
The purpose of the WHC Systems Engineering Management Plan (SEMP) is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices to enhance the WHC engineering management of the SNF Project. The scope of the SEMP encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project. This implementation applies to, and is tailored to the needs of the SNF project and all its subprojects, including all current and future subprojects
An Odyssey of Connecticut's Children: KIDS COUNT Data Book 2001.
Sampson, Amy E.
This Kids Count Data Book provides state and regional trends in the well-being of Connecticut's children. The statistical portrait is based on 19 indicators of well-being: (1) children in families receiving welfare; (2) children receiving free or reduced-price meals; (3) high school employment; (4) births to teen mothers; (5) low birth weight; (6)…
Lightning Mapper Sensor Lens Assembly S.O. 5459: Project Management Plan
Zeidler, Janet
1999-01-01
Kaiser Electro-Optics, Inc. (KEO) has developed this Project Management Plan for the Lightning Mapper Sensor (LMS) program. KEO has integrated a team of experts in a structured program management organization to meet the needs of the LMS program. The project plan discusses KEO's approach to critical program elements including Program Management, Quality Assurance, Configuration Management, and Schedule.
Large hadron collider (LHC) project quality assurance plan
Energy Technology Data Exchange (ETDEWEB)
Gullo, Lisa; Karpenko, Victor; Robinson, Kem; Turner, William; Wong, Otis
2002-09-30
The LHC Quality Assurance Plan is a set of operating principles, requirements, and practices used to support Berkeley Lab's participation in the Large Hadron Collider Project. The LHC/QAP is intended to achieve reliable, safe, and quality performance in the LHC project activities. The LHC/QAP is also designed to fulfill the following objectives: (1) The LHC/QAP is Berkeley Lab's QA program document that describes the elements necessary to integrate quality assurance, safety management, and conduct of operations into the Berkeley Lab's portion of the LHC operations. (2) The LHC/QAP provides the framework for Berkeley Lab LHC Project administrators, managers, supervisors, and staff to plan, manage, perform, and assess their Laboratory work. (3) The LHC/QAP is the compliance document that conforms to the requirements of the Laboratory's Work Smart Standards for quality assurance (DOE O 414.1, 10 CFR 830.120), facility operations (DOE O 5480.19), and safety management (DOE P 450.4).
Large hadron collider (LHC) project quality assurance plan
International Nuclear Information System (INIS)
Gullo, Lisa; Karpenko, Victor; Robinson, Kem; Turner, William; Wong, Otis
2002-01-01
The LHC Quality Assurance Plan is a set of operating principles, requirements, and practices used to support Berkeley Lab's participation in the Large Hadron Collider Project. The LHC/QAP is intended to achieve reliable, safe, and quality performance in the LHC project activities. The LHC/QAP is also designed to fulfill the following objectives: (1) The LHC/QAP is Berkeley Lab's QA program document that describes the elements necessary to integrate quality assurance, safety management, and conduct of operations into the Berkeley Lab's portion of the LHC operations. (2) The LHC/QAP provides the framework for Berkeley Lab LHC Project administrators, managers, supervisors, and staff to plan, manage, perform, and assess their Laboratory work. (3) The LHC/QAP is the compliance document that conforms to the requirements of the Laboratory's Work Smart Standards for quality assurance (DOE O 414.1, 10 CFR 830.120), facility operations (DOE O 5480.19), and safety management (DOE P 450.4)
Directory of Open Access Journals (Sweden)
Emerson Lourenço da Silva
2013-01-01
Full Text Available The planning and execution phases of a distribution center project of a large textile industry was made, evaluating the ergonomic aspects related to the operations to be performed in the facility and staff anthropometric data. The ergonomic collaborative analysis of the tasks associated with the method of movement plotting, guided the planning of the picking, manual induction and order consolidation areas from the distribution center. Using this methodology, it was possible to obtain a proper ergonomically project planning and execution of the three studied areas.
Near-facility environmental monitoring quality assurance project plan
International Nuclear Information System (INIS)
McKinney, S.M.
1997-01-01
This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site
42 CFR 59.5 - What requirements must be met by a family planning project?
2010-10-01
... requirements must be met by a family planning project? (a) Each project supported under this part must: (1... (iii) Promote continued participation in the project by persons to whom family planning services may be... services purchased for project participants will be authorized by the project director or his designee on...
7 CFR 1209.40 - Programs, plans, and projects.
2010-01-01
..., plan, or project, no reference to a brand name, trade name, or State or regional identification of any... SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE MUSHROOM...
Familism and Social Inclusion: Hispanics in New London, Connecticut
Directory of Open Access Journals (Sweden)
Maria Amparo Cruz-Saco
2013-11-01
Full Text Available This paper analyzes the financial support and inclusiveness within Hispanic families in New London, Connecticut, and the causes of their social exclusion in the larger society. We designed and administered a survey of 114 items that was answered by 148 participants representing 1.3% of the non-Puerto Rican Hispanic population. Using factor analysis, we reduced a large number of items in two familism scores to four latent factors: "Financial Support for Family", "Obligation to Family", "Plan to Return", and "Filial Responsibility". We found that financial support for family and obligation to family are strongly endorsed by participants. Approximately one-half would return back to their home countries where they believe to be happier. One-fifth rejects this option. Three-quarters of participants remit money to family, parents in particular, who reside in countries of origin. In contrast to other studies, remitting money is not affected by any given personal characteristic such as gender, income or level of education. Similarly, participants remit irrespective of their degree of self-reported familism measured by scores on the latent factors. A large incidence of poverty among this population, lack of English proficiency, low skills, immigration status, and a lack of voice and political representation inhibit their social inclusion.
UMTRA Project Office quality assurance program plan. Revision 6
International Nuclear Information System (INIS)
1994-09-01
The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites. The UMTRA Project's mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the UMTRA Project Office and its contractors
Spent Nuclear Fuel Project Document Management Plan
International Nuclear Information System (INIS)
Connor, M.D.; Harizison, G.L.; Rice, W.C.
1995-12-01
The SNF Project Document Management Plan identifies and describes the currently available systems and processes for implementing and maintaining an effective document control and records management program. This program governs the methods by which documents are generated, released, distributed, maintained current, retired, and ultimately disposed
OFF-GAS ANALYSIS RESULTS AND FINE PORE RETROFIT INFORMATION FOR GLASTONBURY, CONNECTICUT
In the summer of 1984, the Glastonbury, Connecticut Water Pollution Control Plant underwent a retrofit from a spiral roll coarse bubble to a spiral roll fine pore aeration system. Only diffuser replacement was performed in the aeration tanks. From November 1985 through Septembe...
Project No. 8 - Final decommissioning plan
International Nuclear Information System (INIS)
2000-01-01
Ignalina NPP should prepare the final Ignalina NPP unit 1 decommissioning plan by march 31, 2002. This plan should include the following : description of Ignalina NPP and the Ignalina NPP boundary that could be influenced by decommissioning process; decommissioning strategy selected and a logical substantiation for this selection; description of the decommissioning actions suggested and a time schedule for the actions to be performed; conceptual safety and environmental impact assessment covering ionizing radiation and other man and environment impact; description of the environmental monitoring program proposed during decommissioning process; description of the waste management proposed; assessment of decommissioning expenses including waste management, accumulated funds and other sources. Estimated project cost - 0.75 M EURO
Final Hanford Site Transuranic (TRU) Waste Characterization Qualit Assurance Project Plan
International Nuclear Information System (INIS)
GREAGER, T.M.
1999-01-01
The Transuranic Waste Characterization Quality Assurance Program Plan required each U.S. Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the quality assurance project plan (QAPP)
The Single And Multi Project Approach To Planning And Scheduling
DEFF Research Database (Denmark)
Andersson, Niclas
2008-01-01
The fragmentation of the construction industry in Denmark is reflected in the organisation of construction projects, which typically involves a large number of subcontractors. The main contractor, being responsible for the planning and scheduling of construction work, is thus faced with the chall......The fragmentation of the construction industry in Denmark is reflected in the organisation of construction projects, which typically involves a large number of subcontractors. The main contractor, being responsible for the planning and scheduling of construction work, is thus faced...
Advanced Life Support Project Plan
2002-01-01
Life support systems are an enabling technology and have become integral to the success of living and working in space. As NASA embarks on human exploration and development of space to open the space frontier by exploring, using and enabling the development of space and to expand the human experience into the far reaches of space, it becomes imperative, for considerations of safety, cost, and crew health, to minimize consumables and increase the autonomy of the life support system. Utilizing advanced life support technologies increases this autonomy by reducing mass, power, and volume necessary for human support, thus permitting larger payload allocations for science and exploration. Two basic classes of life support systems must be developed, those directed toward applications on transportation/habitation vehicles (e.g., Space Shuttle, International Space Station (ISS), next generation launch vehicles, crew-tended stations/observatories, planetary transit spacecraft, etc.) and those directed toward applications on the planetary surfaces (e.g., lunar or Martian landing spacecraft, planetary habitats and facilities, etc.). In general, it can be viewed as those systems compatible with microgravity and those compatible with hypogravity environments. Part B of the Appendix defines the technology development 'Roadmap' to be followed in providing the necessary systems for these missions. The purpose of this Project Plan is to define the Project objectives, Project-level requirements, the management organizations responsible for the Project throughout its life cycle, and Project-level resources, schedules and controls.
International Nuclear Information System (INIS)
SINCLAIR, J.C.
1999-01-01
This document sets forth the plans, organization, and control systems for managing the PFP Stabilization and Deactivation Project, and includes the top level cost and schedule baselines. The project includes the stabilization of Pu-bearing materials, storage, packaging, and transport of these and other nuclear materials, surveillance and maintenance of facilities and systems relied upon for storage of the materials, and transition of the facilities in the PFP Complex
Business System Planning Project, Alternatives Analysis
International Nuclear Information System (INIS)
EVOSEVICH, S.
2000-01-01
The CHG Chief Information Officer (CIO) requested a study of alternatives to the current business system computing environment. This Business Systems Planning (BSP) Project Alternatives Analysis document presents an analysis of the current Project Controls, Work Management, and Business Management systems environment and alternative solutions that support the business functions. The project team has collected requirements and priorities from stakeholders in each business area and documented them in the BSP System Requirements Specification (SRS), RPP-6297. The alternatives analysis process identifies and measures possible solutions in each of the business process areas against the requirements as documented in the SRS. The team gathered input from both internal and external sources to identify and grade the possible solutions. This document captures the results of that activity and recommends a suite of software products. This study was to select the best product based on how well the product met the requirements, not to determine the platform or hardware environment that would be used. Additional analysis documentation can be found in BSP project files
Projects of Strategic Action Plan of S&T Innovation
Institute of Scientific and Technical Information of China (English)
无
2002-01-01
@@ In July 2001, CAS decided to shift the focus of the current Knowledge Innovation Program (KIP) onto research projects designed to meet the country's strategic needs, and Iaunched the strategic action plan of innovation (SAPI). Under the SAPI, CAS organized the implementation of seven major projects in 2001.The followings are their profiles.
Project management plan for Reactor 105-C Interim Safe Storage project
International Nuclear Information System (INIS)
Plagge, H.A.
1996-09-01
Reactor 105-C (located on the Hanford Site in Richland, Washington) will be placed into an interim safe storage condition such that (1) interim inspection can be limited to a 5-year frequency; (2) containment ensures that releases to the environmental are not credible under design basis conditions; and (3) final safe storage configuration shall not preclude or significantly increase the cost for any decommissioning alternatives for the reactor assembly.This project management plan establishes plans, organizational responsibilities, control systems, and procedures for managing the execution of Reactor 105-C interim safe storage activities to meet programmatic requirements within authorized funding and approved schedules
European DataGrid project Status and plans
Kunszt, Peter Z
2003-01-01
The European DataGrid (EDG) project has reached, after 1.5 years, the middle of its lifetime. In this article we give an overview of the status, components, procedures and plans of the EDG project as of June 2002. The objective of the EDG project is to assist the next generation of scientific exploration, computation and analysis of large-scale data sets - from hundreds of terabytes to petabytes, across widely distributed scientific communities. The primary goal of the first phase of the EDG project was to assemble a distributed testbed to demonstrate that the EDG middleware components could be integrated into a production-quality computational Grid, as well as to gain experience with such a system. The very first version of the EDG testbed was deployed toward the end of 2001. At the first official European Union review of the project on March 1, 2002, it has been found that the project is on the right track to achieve its goals. Since then the EDG middleware, testbed components and procedures have been conti...
Pietras, Jesse John
This paper describes the state of interactive distance learning in Connecticut, particularly the current and future provision of these services by the telecommunications and cable television industries. The overview examines questions of where obligation and responsibility lie (with schools, local exchange companies, cable franchises, etc.) in…
UMTRA project office federal employee occupational safety and health program plan
International Nuclear Information System (INIS)
1994-06-01
This document establishes the Federal Employee Occupational Safety and Health (FEOSH) Program for the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project Office. This program will ensure compliance with applicable requirements of DOE Order 3790.1B and DOE Albuquerque Operations Office (AL) Order 3790.lA. FEOSH Program responsibilities delegated by the DOE-AL to the UMTRA Project Office by AL Order 3790.1A also are assigned. The UMTRA Project Office has developed the UMTRA Project Environmental, Safety, and Health (ES ampersand H) Plan (DOE, 1992), which establishes the basic programmatic ES ampersand H requirements for all participants on the UMTRA Project. The ES ampersand H plan is designed primarily to cover remedial action activities at UMTRA sites and defines the ES ampersand H responsibilities of both the UMTRA Project Office and its contractors. The UMTRA FEOSH Program described herein is a subset of the overall UMTRA ES ampersand H program and covers only federal employees working on the UMTRA Project
Project licensing plan for UMTRA [Uranium Mill Tailings Remedial Action] sites
International Nuclear Information System (INIS)
1984-07-01
The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Licensing Plan is to establish how a disposal site will be licensed, and to provide responsibilities of participatory agencies as legislated by the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (Public Law 95-604). This Plan has been developed to ensure that the objectives of licensing are met by identifying the necessary institutional controls, participatory agency responsibilities, and key milestones in the licensing process. The Plan contains the legislative basis for and a description of the licensing process (''Process'') for UMTRA sites. This is followed by a discussion of agency responsibilities, and milestones in the Process. The Plan concludes with a generic timeline of this Process. As discussed in Section 2.1, a custodial maintenance and surveillance plan will constitute the basis for a site license. The details of maintenance and surveillance are discussed in the Project Maintenance and Surveillance Plan (AL-350124.0000). 5 refs., 4 figs
2016-07-01
Federal and state transportation planning statutory and regulatory laws require transportation projects to be : consistent with transportation plans and improvement programs before a federal action can be taken on a : project requiring one. Significa...
Systems Engineering Implementation Plan for Single-Shell Tanks (SST) Retrieval Projects
International Nuclear Information System (INIS)
LEONARD, M.W.; HOFFERBER, G.A.
2000-01-01
This document communicates the planned implementation of the Systems Engineering processes and products for the SST retrieval projects as defined in the Systems Engineering Management Plan for the Tank Farm Contractor
Systems Engineering Implementation Plan for Single Shell Tanks (SST) Retrieval Projects
Energy Technology Data Exchange (ETDEWEB)
LEONARD, M.W.; HOFFERBER, G.A.
2000-11-30
This document communicates the planned implementation of the Systems Engineering processes and products for the SST retrieval projects as defined in the Systems Engineering Management Plan for the Tank Farm Contractor.
System Safety Program Plan for Project W-314, tank farm restoration and safe operations
International Nuclear Information System (INIS)
Boos, K.A.
1996-01-01
This System Safety Program Plan (SSPP) outlines the safety analysis strategy for project W-314, ''Tank Farm Restoration and Safe Operations.'' Project W-314 will provide capital improvements to Hanford's existing Tank Farm facilities, with particular emphasis on infrastructure systems supporting safe operation of the double-shell activities related to the project's conceptual Design Phase, but is planned to be updated and maintained as a ''living document'' throughout the life of the project to reflect the current safety analysis planning for the Tank Farm Restoration and Safe Operations upgrades. This approved W-314 SSPP provides the basis for preparation/approval of all safety analysis documentation needed to support the project
Rhode Island, Connecticut, New York, and New Jersey ESI: M_MAMMAL (Marine Mammal Polygons)
National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains sensitive biological resource data for seals, whales, and dolphins in coastal Rhode Island, Connecticut, and the New York/New Jersey...
Rhode Island, Connecticut, New York, and New Jersey ESI: HABPT (Habitat and Plant Points)
National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains sensitive biological resource data for rare terrestrial plants in coastal Rhode Island, Connecticut, New York, and New Jersey. Vector points...
Project management for small business: a streamlined approach from planning to completion
National Research Council Canada - National Science Library
Phillips, Joseph
2012-01-01
... a Project Management Plan 81 72 Developing the Work Breakdown Structure 85 76 Selecting Your Project Management Software 83 65 CHAPTER 4: MANAGING PROJECT COSTS Building a Cost Management Frame...
Risk Management Plan for Tank Farm Restoration and Safe Operations, Project W-314
International Nuclear Information System (INIS)
MCGREW, D.L.
2000-01-01
The Risk Management Plan for Project W-314 describes the systems, processes and procedures for implementation of applicable risk management practices described in HNF-0842, Volume IV, Section 2.6, ''Risk Management''. This plan is tailored specifically for use by Project W-314
International Nuclear Information System (INIS)
1995-01-01
The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place nineteen former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S ampersand M) and as quickly and economically as possible. Implementation and completion of the deactivation project win further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S ampersand M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project
The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan
Energy Technology Data Exchange (ETDEWEB)
Fix, N. J.
2008-03-12
Pacific Northwest National Laboratory researchers are working on the Columbia River Protection Supplemental Technologies Project. This project is a U. S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies, and technologies for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Technologies Project staff.
History of Connecticut's short-term strain program for evaluation of steel bridges : July 2009.
2009-07-01
Non-destructive strain monitoring has been used for two decades on Connecticuts bridges to : supplement visual field inspections. These studies have addressed a wide range of problems, : including fatigue cracking in diaphragm connections, cracked...
Rhode Island, Connecticut, New York, and New Jersey ESI: T_MAMMAL (Terrestrial Mammal Polygons)
National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains sensitive biological resource data for small mammal species in coastal Rhode Island, Connecticut, New York, and New Jersey. Vector polygons in...
Phased project planning and development in anticipation of operational programs
Stroud, W. G.
1973-01-01
The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.
Fast Missile Boat Project Planning using CPM and What If Analysis Method
Silvianita; Firmansyah, R.; Rosyid, D. M.; Suntoyo; Chamelia, D. M.
2018-03-01
This paper discusses analysis of fast ship missile project planning with CPM and What If analysis.The poor performance can cause project delay and cost overruns, these two things often occur in a project management. Scheduling has an important role to control the project. Good scheduling is required because it will affect the product quality. Scheduling is useful to manage the activities so that the project completion time can be as short as possible and it is used to determine the costs of the project are in optimum condition. The alternatives that can be used to overcome the delay project namely increasing labor and equipment.Project planning can be done to determine whether the project is already in an optimum condition. Alternatives that can be used to overcome the delay in the project is to increase labor and equipment, the next is to look for the optimum solution taking into account the duration and gain of each alternative.
UMTRA project technical assistance contractor quality assurance implementation plan
International Nuclear Information System (INIS)
1994-03-01
The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center
Quality Assurance program plan - plutonium stabilization and handling project W-460
International Nuclear Information System (INIS)
SCHULTZ, J.W.
1999-01-01
This Quality Assurance Program Plan (QAPP) identifies Project Quality Assurance (QA) program requirements for all parties participating in the design, procurement, demolition, construction, installation, inspection and testing for Project W-460
242-A evaporator quality assurance project plan: Revision 1
International Nuclear Information System (INIS)
Tucker, B.J.
1994-01-01
The scope of this quality assurance project plan (Plan) is sampling and analytical services including, but not limited to, sample receipt, handling and storage, analytical measurements, submittal of data deliverables, archiving selected portions of samples, returning unneeded sample material to Westinghouse Hanford Company (WHC), and/or sample disposal associated with candidate feed samples and process condensate compliance samples. Sampling and shipping activities are also included within the scope. The purpose of this project is to provide planning, implementation, and assessment guidance for achieving established data quality objectives measurement parameters. This Plan requires onsite and offsite laboratories to conform to that guidance. Laboratory conformance will help ensure that quality data are being generated and therefore, that the 242-A evaporator is operating in a safe and compliant manner. The 242-A evaporator feed stream originates from double-shell tanks (DSTs) identified as candidate feed tanks. The 242-A evaporator reduces the volume of aqueous waste contained in DSTs by boiling off water and sending it to the Liquid Effluent Retention Facility (LERF) storage basin before further treatment. The slurry product is returned to DSTs. Evaporation results in considerable savings by reducing the volume of mixed waste for disposal
Rhode Island, Connecticut, New York, and New Jersey ESI: M_MAMPT (Marine Mammal Points)
National Oceanic and Atmospheric Administration, Department of Commerce — This data set contains sensitive biological resource data for seal haul-out sites in coastal Rhode Island, Connecticut, New York, and New Jersey. Vector points in...
OFF-GAS ANALYSIS RESULTS AND FINE PORE RETROFIT CASE HISTORY FOR HARTFORD, CONNECTICUT
In the summer of 1982, the Hartford Metropolitan District Commission, Hartford County, Connecticut, Water Pollution Control Facility underwent a retrofit form a spiral roll coarse bubble to a full floor coverage fine pore aeration system. Work performed included all new in-tank ...
Energy Technology Data Exchange (ETDEWEB)
Irene Farnham
2011-05-01
This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurance Project Plan, Nevada Test Site, Nevada, Revision 4.
Solid Waste Information and Tracking System Server Conversion Project Management Plan
International Nuclear Information System (INIS)
GLASSCOCK, J.A.
2000-01-01
The Project Management Plan governing the conversion of SWITS to a client-server architecture. The PMP describes the background, planning and management of the SWITS conversion. Requirements and specification documentation needed for the SWITS conversion
UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1
International Nuclear Information System (INIS)
1995-09-01
Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site
Salt Repository Project transportation program plan
International Nuclear Information System (INIS)
Fisher, R.L.; Greenberg, A.H.; Anderson, T.L.; Yates, K.R.
1987-01-01
The Salt Repository Project (SRP) has the responsibility to develop a comprehensive transportation program plan (TrPP) that treats the transportation of workers, supplies, and high-level radioactive waste to the site and the transportation of salt, low-level, and transuranic wastes from the site. The TrPP has developed a systematic approach to transportation which is directed towards satisfying statutes, regulations, and directives and is guided by a hierarchy of specific functional requirements, strategies, plans, and reports. The TrPP identifies and develops the planning process for transportation-related studies and provides guidance to staff in performing and documenting these activities. The TrPP also includes an explanation of the responsibilities of the organizational elements involved in these transportation studies. Several of the report chapters relate to identifying routes for transporting nuclear waste to the site. These include a chapter on identifying an access corridor for a new rail route leading to the site, identifying and evaluating emergency-response preparedness capabilities along candidate routes in the state, and identifying alternative routes from the state border, ports, or in-state reactors to the site. The TrPP also includes plans for identifying salt disposal routes and a discussion of repository/transportation interface requirements. 89 refs., 6 figs
Nuclear criticality project plan for the Hanford Site tank farms
Energy Technology Data Exchange (ETDEWEB)
Bratzel, D.R., Westinghouse Hanford
1996-08-06
The mission of this project is to provide a defensible technical basis report in support of the Final Safety Analysis Report (FSAR). This technical basis report will also be used to resolve technical issues associated with the nuclear criticality safety issue. The strategy presented in this project plan includes an integrated programmatic and organizational approach. The scope of this project plan includes the provision of a criticality technical basis supporting document (CTBSD) to support the FSAR as well as for resolution of the nuclear criticality safety issue. Specifically, the CTBSD provides the requisite technical analysis to support the FSAR hazard and accident analysis as well as for the determination of the required FSAR limits and controls. The scope of The CTBSD will provide a baseline for understanding waste partitioning and distribution phenomena and mechanistics for current operational activities inclusive of single-shell tanks, double-shell tanks, double-contained receiver tanks, and miscellaneous underground storage tanks.. Although the FSAR does not include future operational activities, the waste partitioning and distribution phenomena and mechanistics work scope identified in this project plan provide a sound technical basis as a point of departure to support independent safety analyses for future activities. The CTBSD also provides the technical basis for resolution of the technical issues associated with the nuclear criticality safety issue. In addition to the CTBSD, additional documentation will be required to fully resolve U.S. Department of Energy-Headquarters administrative and programmatic issues. The strategy and activities defined in this project plan provide a CTBSD for the FSAR and for accelerated resolution of the safety issue in FY 1996. On April 30, 1992, a plant review committee reviewed the Final Safety Analysis Reports for the single-shell, double-shell, and aging waste tanks in light of the conclusions of the inadequate waste
European DataGrid project: status and plans
International Nuclear Information System (INIS)
Kunszt, P.
2003-01-01
The European DataGrid (EDG) project has reached, after 1.5 years, the middle of its lifetime. In this article we give an overview of the status, components, procedures and plans of the EDG project as of June 2002. The objective of the EDG project is to assist the next generation of scientific exploration, computation and analysis of large-scale data sets--from hundreds of terabytes to petabytes, across widely distributed scientific communities. The primary goal of the first phase of the EDG project was to assemble a distributed testbed to demonstrate that the EDG middleware components could be integrated into a production-quality computational Grid, as well as to gain experience with such a system. The very first version of the EDG testbed was deployed toward the end of 2001. At the first official European Union review of the project on March 1, 2002, it has been found that the project is on the right track to achieve its goals. Since then the EDG middleware, testbed components and procedures have been continuously refined according to the requirements of our user communities and our experience
Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan
International Nuclear Information System (INIS)
Vollmer, A.T.
1993-10-01
The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references
Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan
Energy Technology Data Exchange (ETDEWEB)
Vollmer, A.T.
1993-10-01
The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.
SRP [Salt Repository Project] configuration management plan
International Nuclear Information System (INIS)
1987-01-01
This configuration management plan describes the organization, policies, and procedures that will be used on the Salt Repository Project (SRP) to implement the configuration management disciplines and controls. Configuration management is a part of baseline management. Baseline management is defined in the SRP Baseline Procedures Notebook and also includes cost and schedule baselines. Configuration management is a discipline applying technical and administrative direction and surveillance to identify and document the functional and physical characteristics of an item, to control changes to those characteristics, to record and report change processing and implementation status, and to audit the results. Configuration management is designed as a project management tool to determine and control baselines, and ensure and document all components of a project interface both physically and functionally. The purpose is to ensure that the product acquired satisfies the project's technical and operational requirements, and that the technical requirements are clearly defined and controlled throughout the development and acquisition process. 5 figs
Gas generation matrix depletion quality assurance project plan
International Nuclear Information System (INIS)
1998-01-01
The Los Alamos National Laboratory (LANL) is to provide the necessary expertise, experience, equipment and instrumentation, and management structure to: Conduct the matrix depletion experiments using simulated waste for quantifying matrix depletion effects; and Conduct experiments on 60 cylinders containing simulated TRU waste to determine the effects of matrix depletion on gas generation for transportation. All work for the Gas Generation Matrix Depletion (GGMD) experiment is performed according to the quality objectives established in the test plan and under this Quality Assurance Project Plan (QAPjP)
Systems engineering management plan for the Salt Repository Project
International Nuclear Information System (INIS)
Neff, J.O.
1986-08-01
This document presents the plan for using systems engineering in conducting and managing the technical work of the Salt Repository Project (SRP) of the US Department of Energy's Civilian Radioactive Waste Management Program. The need for preparing a Systems Engineering Management Plan (SEMP) is traced back to relevant DOE directives. These directives are interpreted as SRP requirements in the context of the Mined Geologic Disposal System. The strategy for conducting systems engineering on the SRP, including the role of the systems engineering process, is then described. The SEMP also designates who in the project organization will be responsible for carrying out the activities. Finally, the management tools that are used to implement the systems engineering process, including associated documentation on the SRP, are described
2013-01-31
... Organizations: Voluntary Relinquishment From The Connecticut Hospital Association Federal Patient Safety Organization AGENCY: Agency for Healthcare Research and Quality (AHRQ), HHS. ACTION: Notice of delisting..., 42 U.S.C. 299b-21--b-26, provides for the formation of Patient Safety Organizations (PSOs), which...
Project W-314 specific test and evaluation plan 241-AN-B valve pit
International Nuclear Information System (INIS)
Hays, W.H.
1998-01-01
The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)
Nevada Nuclear Waste Storage Investigations. FY 1979 project plan
International Nuclear Information System (INIS)
1979-03-01
This document presents the management and cost for the Nevada Nuclear Waste Storage Investigations (disposal of high-level wastes at Nevada Test Site) and provides a complete description of the overall project, management structure, technical approach, and work breakdown structure. The document is organized into five major sections. Section I summarizes the history of the project and indicates a potential future course of action. FY 1979 project work is briefly described in Section II. Section III outlines the delegated responsibilities of all project management functions. A list of critical questions that guide the technical approach of the project are presented in Section IV. Section V contains subtask work plans which outline the work in detail for this fiscal year
Final Hanford Site Transuranic (TRU) Waste Characterization QA Project Plan
International Nuclear Information System (INIS)
GREAGER, T.M.
2000-01-01
The Quality Assurance Project Plan (QAPjP) has been prepared for waste characterization activities to be conducted by the Transuranic (TRU) Project at the Hanford Site to meet requirements set forth in the Waste Isolation Pilot Plan (WIPP) Hazardous Waste Facility Permit, 4890139088-TSDF, Attachment B, including Attachments B1 through B6 (WAP) (DOE, 1999a). The QAPjP describes the waste characterization requirements and includes test methods, details of planned waste sampling and analysis, and a description of the waste characterization and verification process. In addition, the QAPjP includes a description of the quality assurance/quality control (QA/QC) requirements for the waste characterization program. Before TRU waste is shipped to the WIPP site by the TRU Project, all applicable requirements of the QAPjP shall be implemented. Additional requirements necessary for transportation to waste disposal at WIPP can be found in the ''Quality Assurance Program Document'' (DOE 1999b) and HNF-2600, ''Hanford Site Transuranic Waste Certification Plan.'' TRU mixed waste contains both TRU radioactive and hazardous components, as defined in the WLPP-WAP. The waste is designated and separately packaged as either contact-handled (CH) or remote-handled (RH), based on the radiological dose rate at the surface of the waste container. RH TRU wastes are not currently shipped to the WIPP facility
Fuels planning: science synthesis and integration; fact sheet: The Fuels Synthesis Project overview
Rocky Mountain Research Station USDA Forest Service
2004-01-01
The geographic focus of the "Fuels Planning: Science Synthesis and Integration" project #known as the Fuels Synthesis Project# is on the dry forests of the Western United States. Target audiences include fuels management specialists, resource specialists, National Environmental Policy Act #NEPA# planning team leaders, line officers in the USDA Forest Service...
Near-Facility Environmental Monitoring Quality Assurance Project Plan
International Nuclear Information System (INIS)
MCKINNEY, S.M.
2000-01-01
This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near-facility environmental monitoring directed by Waste Management Technical Services and supersedes HNF-EP-0538-4. This plan applies to all sampling and monitoring activities performed by Waste Management Technical Services in implementing near-facility environmental monitoring at the Hanford Site. This Quality Assurance Project Plan is required by U.S. Department of Energy Order 5400.1 (DOE 1990) as a part of the Environmental Monitoring Plan (DOE-RL 1997) and is used to define: Environmental measurement and sampling locations used to monitor environmental contaminants near active and inactive facilities and waste storage and disposal sites; Procedures and equipment needed to perform the measurement and sampling; Frequency and analyses required for each measurement and sampling location; Minimum detection level and accuracy; Quality assurance components; and Investigation levels. Near-facility environmental monitoring for the Hanford Site is conducted in accordance with the requirements of U.S. Department of Energy Orders 5400.1 (DOE 1990), 5400.5 (DOE 1993), 5484.1 (DOE 1990), and 435.1 (DOE 1999), and DOE/EH-O173T (DOE 1991). It is Waste Management Technical Services' objective to manage and conduct near-facility environmental monitoring activities at the Hanford Site in a cost-effective and environmentally responsible manner that is in compliance with the letter and spirit of these regulations and other environmental regulations, statutes, and standards
MEET : project action plan for AUMA energy management program
Energy Technology Data Exchange (ETDEWEB)
NONE
2002-11-22
The Municipal Energy Efficiency Trust (MEET) action plan offers a framework to help municipalities in Alberta demonstrate leadership in reducing energy consumption. It sets out targets for energy reductions and the associated capital investment. As more information is compiled from energy audits, the targets will be refined. AUMA and Enmax Energy Corp have partnered to provide energy audits designed to allow all municipalities to undertake energy savings projects. The program is divided into 8 basic categories for energy savings projects including: water and sewage collection, treatment and distribution; recreation centres such as pools and skating rinks; streetlights; office buildings; garages, shops and parking lots; other and innovative projects; municipal audit evaluation support; and, direct grants applied to each project. The estimates for energy savings within each category are provided. The maximum allowable payback period for the project is assumed to be 15 years. Total municipal energy use in Alberta is estimated at 1,100,000 MWh per year. A province wide program will enable AUMA to provide centralized services such as project management and procurement services to address municipal resource constraints and provide some economies of scale for smaller municipalities. AUMA will act as the fund administrator and will set criteria for acceptable projects. The action plan focuses on the energy audit program, municipal facility data collection, municipal staff education, and the establishment of a funding pool. The target for 2002/2003 will be to identify projects with energy savings of at least 15,000 MWh for water treatment and distribution recreation centres for a total capital cost of $13,500,000. 1 tab., 3 figs.
PNNL Apatite Investigation at 100-NR-2 Quality Assurance Project Plan
Energy Technology Data Exchange (ETDEWEB)
Fix, N. J.
2009-04-02
In 2004, the U.S. Department of Energy, Fluor Hanford, Inc., Pacific Northwest National Laboratory (PNNL), and the Washington Department of Ecology agreed that the long-term strategy for groundwater remediation at the 100-N Area would include apatite sequestration as the primary treatment, followed by a secondary treatment if necessary. Since then, the agencies have worked together to agree on which apatite sequestration technology has the greatest chance of reducing strontium-90 flux to the Columbia River. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by staff working on the PNNL Apatite Investigation at 100-NR-2 Project. The plan is designed to be used exclusively by project staff.
International Nuclear Information System (INIS)
Zollinger, R.C.; Blauvelt, R.P.; Chew, R.T. III.
1982-09-01
The Providence Quadrangle, Connecticut, Rhode Island, and Massachusetts, was evaluated to a depth of 1500 m to identify environments and delineate areas favorable for uranium deposits. Criteria for this evaluation were developed by the National Uranium Resource Evaluation program. Environments were recognized after literature research, surface and subsurface geologic reconnaissance, and examination of known uranium occurrences and aeroradioactivity anomalies. Environments favorable for authigenic uranium deposits were found in the Quincy and Cowesett Granites. An environment favorable for contact-metasomatic deposits is in and around the borders of the Narragansett Pier Granite where it intrudes the Pennsylvanian sediments of the Narragansett Basin. An environment favorable for authigenic deposits in metamorphic rocks is in a migmatite on the eastern edge of the Scituate Granite Gneiss batholith. Environments favorable for contact-metasomatic deposits occur at the contacts between many of the granitic rocks and metamorphic rocks of the Blackstone Series. Results of this study also indicate environments favorable for sandstone-type uranium deposits are present in the rocks of the Narragansett Basin. Environments unfavorable for uranium deposits in the quadrangle include all granites not classified as favorable and the metamorphic rocks of eastern Connecticut. Glacial deposits and Cretaceous-Tertiary sediments remain unevaluated
Trace elements and radionuclides in the Connecticut River and Amazon River estuary
International Nuclear Information System (INIS)
Dion, E.P.
1983-01-01
The Connecticut River, its estuary and the Amazon River plume were studied to elucidate processes which control the flux of nuclides to the sea. Major ions (Ca, Mg, Na, Cl, Bicarbonate) and selected trace elements (Ra, Ba, Cu, Si) are introduced to the Connecticut River in proportion to the total dissolved load of various groundwaters. Si, Ra, and Ba are subject to removal from solution by seasonal diatom productivity; whereas the other groundwater-derived elements are found in proportion to TDS both time and space. These nuclides are released in the estuary when a portion of the Ra, Ba, and Si in riverine biogenic detritus is trapped in salt marshes and coves bordering the estuary where it redissolves and is exported to the main river channel at ebb tide. In the Amazon River estuary, the Ra and Ba are released in mid-salinity waters. Ra and Ba together with Si are subsequently removed by diatom productivity as reflected in increased Ra and Ba in the suspended particles and depleted dissolved nuclide concentrations in samples from the high productivity zone. In both the Connecticut River system and the Amazon River plume, Cu behaves conservatively; whereas the fates of Fe and Al are linked to soil-derived humic acids. Trace elements in Amazon plume sediments are found simply in proportion to the percentage of fine-grained size materials, despite low Th-228/Ra-228 mean residence times in the plume and the presence of Cs-137 in the sediment column. Estimates of the total flux of nuclides to the oceans can best be calculated on a mass balance basis using groundwater inputs. Unless significant repositories for nuclides exist in the river-estuarine system, the groundwater flux of dissolved nuclides is net flux to the ocean despite the reactions which occur in both rivers and estuaries
Connecticut Transit (CTTRANSIT) Fuel Cell Transit Bus: Second Evaluation Report and Appendices
Energy Technology Data Exchange (ETDEWEB)
Chandler, K.; Eudy, L.
2009-05-01
This report describes operations at Connecticut Transit (CTTRANSIT) in Hartford for one prototype fuel cell bus and three new diesel buses operating from the same location. The evaluation period in this report (January 2008 through February 2009) has been chosen to coincide with a UTC Power propulsion system changeout that occurred on January 15, 2008.
Project planning and management techniques of the fast-paced TMX-Upgrade construction
International Nuclear Information System (INIS)
Seberger, C.D.; Chargin, A.K.
1981-01-01
The Tandem Mirror Experiment-Upgrade (TMX-Upgrade) construction will be completed in 18 months at a total cost of $14.5 million. This paper describes the project planning and the management techniques used to complete the TMX-Upgrade within its allocated cost and schedule. In the planning stages of a project, before approval of the proposal, we define major project objectives, create a work breakdown structure (WBS), detail a technical description for each level of the WBS, and provide detailed bottoms-up cost estimates and summary schedules. In the operating phase, which continues throughout the project, we establish budget and schedule baselines. The reporting phase includes The Department of Energy (DOE) reviews of project status at monthly, quarterly, and semiannual intervals. These reports include cost, schedule, manpower, major procurement, and technical status information
Yucca Mountain Site Characterization Project Waste Package Plan
International Nuclear Information System (INIS)
Harrison-Giesler, D.J.; Jardine, L.J.
1991-02-01
The goal of the US Department of Energy's (DOE) Yucca Mountain Site Characterization Project (YMP) waste package program is to develop, confirm the effectiveness of, and document a design for a waste package and associated engineered barrier system (EBS) for spent nuclear fuel and solidified high-level nuclear waste (HLW) that meets the applicable regulatory requirements for a geologic repository. The Waste Package Plan describes the waste package program and establishes the technical approach against which overall progress can be measured. It provides guidance for execution and describes the essential elements of the program, including the objectives, technical plan, and management approach. The plan covers the time period up to the submission of a repository license application to the US Nuclear Regulatory Commission (NRC). 1 fig
PROJECT PLANNING AND CONTROLLING GEDUNG RUSUNAWA UNIVERSITAS INDONESIA DENGAN MS.PROJECT
Directory of Open Access Journals (Sweden)
Sanny Stephanie
2016-09-01
Full Text Available Suatu proyek konstruksi selalu dimulai dengan proses perencanaan proyek (Project planning hingga pengendalian proyek (Project controlling Apabila terjadi perencanaan yang tidak matang dan pengendalian proyek yang kurang efektif, maka akan mengakibatkan penyimpangan dalam proyek tersebut seperti proyek selesai lebih cepat ataupun keterlambatan proyek.. Penelitian ini bertujuan untuk menganalisis perencanaan dan pengendalian proyek gedung Rusunawa Universitas Indonesia (asrama UI Jakarta Selatan dengan menggunakan bantuan program Microsoft Project. Berdasarkan kontrak, proyek ini dimulai pada tanggal 4 Desember 2014 s/d 10 Juli 2015. Dilihat dari hasil analisa kurva S Rencana dan kurva S aktual sampai dengan tanggal 31 Mei 2015, kurva S Aktual berada dibawah kurva S Rencana, dimana pada minggu ke-9 s/d minggu ke -35 proyek mengalami keterlambatan sebesar 18%, yaitu terlambat 10 hari dari rencana. Namun, dengan dilakukannya percepatan jadwal pada proyek ini dengan memperpendek durasi dan menambah tenaga kerja, maka penyelesaian proyek Rusunawa UI Jakarta Selatan ini masih dapat diselesaikan tepat waktu dan sesuai dengan jadwal yang telah ditentukan.
77 FR 33240 - Central Valley Project Improvement Act, Water Management Plans
2012-06-05
... Project water conservation best management practices that shall ``develop criteria for evaluating the... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...
75 FR 70020 - Central Valley Project Improvement Act, Water Management Plans
2010-11-16
... office on Central Valley Project water conservation best management practices that shall ``* * * develop... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior ACTION: Notice of Availability. SUMMARY: The...
76 FR 12756 - Central Valley Project Improvement Act, Water Management Plans
2011-03-08
... office on Central Valley Project water conservation best management practices that shall ``* * * develop... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...
77 FR 64544 - Central Valley Project Improvement Act, Water Management Plans
2012-10-22
... Central Valley Project water conservation best management practices that shall ``develop criteria for... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...
Planning linear construction projects: automated method for the generation of earthwork activities
Askew, W.H.; Al-Jibouri, Saad H.S.; Mawdesley, M.J.; Patterson, D.E.
2002-01-01
Earthworks planning for road construction projects is a complex operation and the planning rules used are usually intuitive and not well defined. An approach to automate the earthworks planning process is described and the basic techniques that are used are outlined. A computer-based system has been
Thom, Jinhee P; Crockett, Carolyn M
2008-05-01
We describe a method for managing environmental enhancement plans for individual research projects at a national primate research center where most monkeys are assigned to active research projects. The Psychological Well-being Program (PWB) at the University of Washington National Primate Research Center developed an Environmental Enhancement Plan form (EEPL) that allows PWB to quantify and track changes in enrichment allowances over time while ensuring that each animal is provided with as much enrichment as possible without compromising research. Very few projects involve restrictions on toys or perches. Some projects have restrictions on food treats and foraging, primarily involving the provision of these enrichments by research staff instead of husbandry staff. Restrictions are not considered exemptions unless they entirely prohibit an element of the University of Washington Environmental Enhancement Plan (UW EE Plan). All exemptions must be formally reviewed and approved by the institutional animal care and use committee. Most exemptions from elements of the UW EE Plan involve social housing. Between 2004 and 2006, the percentage of projects with no social contact restrictions increased by 1%, but those prohibiting any tactile social contact declined by 7%, and projects permitting tactile social contact during part of the study increased by 9%. The EEPL form has facilitated informing investigators about the enrichment their monkeys will receive if no restrictions or exemptions are requested and approved. The EEPL form also greatly enhances PWB's ability to coordinate the specific enrichment requirements of a project.
Columbia River Channel Improvement Project Rock Removal Blasting: Monitoring Plan
Energy Technology Data Exchange (ETDEWEB)
Carlson, Thomas J.; Johnson, Gary E.
2010-01-29
This document provides a monitoring plan to evaluate take as outlined in the National Marine Fisheries Service 2002 Biological Opinion for underwater blasting to remove rock from the navigation channel for the Columbia River Channel Improvement Project. The plan was prepared by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers (USACE), Portland District.
76 FR 54251 - Central Valley Project Improvement Act, Water Management Plans
2011-08-31
... and administer an office on Central Valley Project water conservation best management practices that... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...
75 FR 38538 - Central Valley Project Improvement Act, Water Management Plans
2010-07-02
... to establish and administer an office on Central Valley Project water conservation best management... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...
Mitchell, S. M.; Richardson, D. J.; Lindsay, D. S.
2006-01-01
The prevalence of agglutinating antibodies to Toxoplasma gondii was examined in striped skunks (Mephitis mephitis), opossums (Didelphis virginiana), and raccoons (Procyon lotor) from 8 cities in Connecticut. Ten (42%) of the 24 striped skunks, 2 of 7 (29%) opossums, and 12 of 12 (100%) raccoons were positive at dilutions of 1:50 or greater. These results suggest that T. gondii is prevalent in the environment, or prey items, or both, of these omnivores in Connecticut.
Mitchell, Sheila M; Richardson, Dennis J; Lindsay, David S
2006-06-01
The prevalence of agglutinating antibodies to Toxoplasma gondii was examined in striped skunks (Mephitis mephitis), opossums (Didelphis virginiana), and raccoons (Procyon lotor) from 8 cities in Connecticut. Ten (42%) of the 24 striped skunks, 2 of 7 (29%) opossums, and 12 of 12 (100%) raccoons were positive at dilutions of 1:50 or greater. These results suggest that T. gondii is prevalent in the environment, or prey items, or both, of these omnivores in Connecticut.
A case study of resources management planning with multiple objectives and projects
Peterson, David L.; Silsbee, David G.; Schmoldt, Daniel L.
1994-09-01
Each National Park Service unit in the United States produces a resources management plan (RMP) every four years or less. The plans commit budgets and personnel to specific projects for four years, but they are prepared with little quantitative and analytical rigor and without formal decision-making tools. We have previously described a multiple objective planning process for inventory and monitoring programs (Schmoldt and others 1994). To test the applicability of that process for the more general needs of resources management planning, we conducted an exercise on the Olympic National Park (NP) in Washington State, USA. Eight projects were selected as typical of those considered in RMPs and five members of the Olympic NP staff used the analytic hierarchy process (AHP) to prioritize the eight projects with respect to their implicit management objectives. By altering management priorities for the park, three scenarios were generated. All three contained some similarities in rankings for the eight projects, as well as some differences. Mathematical allocations of money and people differed among these scenarios and differed substantially from what the actual 1990 Olympic NP RMP contains. Combining subjective priority measures with budget dollars and personnel time into an objective function creates a subjective economic metric for comparing different RMP’s. By applying this planning procedure, actual expenditures of budget and personnel in Olympic NP can agree more closely with the staff’s management objectives for the park.
Modeling Waves and Coastal Flooding along the Connecticut Coast
Cifuentes-Lorenzen, A.; Howard-Strobel, M. M.; Fake, T.; McCardell, G.; O'Donnell, J.; Asthita, M.
2015-12-01
We have used a hydrodynamic- wave coupled numerical model (FVCOM-SWAVE) to simulate flooding at the Connecticut coastline during severe storms. The model employed a one-way nesting scheme and an unstructured grid. The parent domain spanned most of the southern New England shelf and the fine resolution grid covered Long Island Sound (LIS) and extended across the Connecticut coast to the 10m elevation contour. The model results for sea level, current and wave statistics from the parent grid have been tested with data from several field campaigns at different locations spanning the western, central and eastern portions of LIS. Waves are fetch limited and improvements to the model-data comparison required modifications to spectral coefficients in the wave model. Finally, the nested results were validated with two field campaigns in shallow water environments (i.e. New Haven and Old Saybrook). To assess the spatial variability of storm wave characteristics the domain was forced with the hindcast winds obtained from meteorological models (NAM and WRF) for 13 severe weather events that affected LIS in the past 15 years. We have also forced the system with a simulation of Superstorm Sandy in a warmer climate to assess the impact a climate change on the character of flooding. The nested grid is currently being used to map flooding risks under severe weather events including the effects of precipitation on river flow and discharge.
Planned and ongoing projects (pop) database: development and results.
Wild, Claudia; Erdös, Judit; Warmuth, Marisa; Hinterreiter, Gerda; Krämer, Peter; Chalon, Patrice
2014-11-01
The aim of this study was to present the development, structure and results of a database on planned and ongoing health technology assessment (HTA) projects (POP Database) in Europe. The POP Database (POP DB) was set up in an iterative process from a basic Excel sheet to a multifunctional electronic online database. The functionalities, such as the search terminology, the procedures to fill and update the database, the access rules to enter the database, as well as the maintenance roles, were defined in a multistep participatory feedback loop with EUnetHTA Partners. The POP Database has become an online database that hosts not only the titles and MeSH categorizations, but also some basic information on status and contact details about the listed projects of EUnetHTA Partners. Currently, it stores more than 1,200 planned, ongoing or recently published projects of forty-three EUnetHTA Partners from twenty-four countries. Because the POP Database aims to facilitate collaboration, it also provides a matching system to assist in identifying similar projects. Overall, more than 10 percent of the projects in the database are identical both in terms of pathology (indication or disease) and technology (drug, medical device, intervention). In addition, approximately 30 percent of the projects are similar, meaning that they have at least some overlap in content. Although the POP DB is successful concerning regular updates of most national HTA agencies within EUnetHTA, little is known about its actual effects on collaborations in Europe. Moreover, many non-nationally nominated HTA producing agencies neither have access to the POP DB nor can share their projects.
Enabling strategic projects: assessment of key instruments for national spatial planning
Savini, F.; Salet, W.; Majoor, S.
2010-01-01
This research focuses on the instruments and tools which national planning agencies have at their disposal to intervene and get involved in strategic projects. The research examines how strategic national visions are translated into interventions in local projects across the Dutch territory. This
Breckinridge Project, initial effort. Report VII, Volume 4. Safety and health plan
Energy Technology Data Exchange (ETDEWEB)
None
1982-01-01
The Safety and Health Plan recognizes the potential hazards associated with the Project and has been developed specifically to respond to these risks in a positive manner. Prevention, the primary objective of the Plan, starts with building safety controls into the process design and continues through engineering, construction, start-up, and operation of the Project facilities and equipment. Compliance with applicable federal, state, and local health and safety laws, regulations, and codes throughout all Project phases is required and assured. The Plan requires that each major Project phase be thoroughly reviewed and analyzed to determine that those provisions required to assure the safety and health of all employees and the public, and to prevent property and equipment losses, have been provided. The Plan requires followup on those items or situations where corrective action needs were identified to assure that the action was taken and is effective. Emphasis is placed on loss prevention. Exhibit 1 provides a breakdown of Ashland Synthetic Fuels, Inc.'s (ASFI's) Loss Prevention Program. The Plan recognizes that the varied nature of the work is such as to require the services of skilled, trained, and responsible personnel who are aware of the hazards and know that the work can be done safely, if done correctly. Good operating practice is likewise safe operating practice. Training is provided to familiarize personnel with good operational practice, the general sequence of activities, reporting requirements, and above all, the concept that each step in the operating procedures must be successfully concluded before the following step can be safely initiated. The Plan provides for periodic review and evaluation of all safety and loss prevention activities at the plant and departmental levels.
Identifying Contractors’ Planned Quality Costs in Indonesian Construction Projects
Directory of Open Access Journals (Sweden)
Puti F. Marzuki
2014-12-01
Full Text Available In a very competitive construction industry, quality costs have to be measured to be able to identify potential quality problem areas and to focus attention on work output improvement opportunities. The awareness of contractors on the importance of quality costs could be reflected in the extent of their quality costs planning. This paper presents an identification of planned quality costs in three construction projects executed by two large Indonesian contractors, a state-owned company and a private company in Jakarta. The objective is to enable the contractors to elaborate their quality costs planning and thereby improve their work output based on the findi ngs. Quality costs are first grouped into three categories: prevention, appraisal, and failure costs. Based on the works of previous researchers, a list of quality management activities that should be covered in each quality costs category is then created. The contractors’ planned quality costs data for each category are identified and collected through interviews and questionnaire surveys that refer to the list. Quality costs are expressed as a percentage of contract value. It is revealed that although large contractors already have certain knowledge on quality costs in construction projects, these costs are not planned in a structured way through an analysis of systematic quality costs records. Through cost categorization it is also shown that higher prevention and appraisal costs lead to lower failure costs. It is then concluded that a lot of work is still to be done by the contractors to set up a quality costs recording system which can serve as a basis for their quality improvement planning.
Uranium mill tailings remedial action project real estate management plan
International Nuclear Information System (INIS)
1994-09-01
This plan summarizes the real estate requirements of the US Department of Energy's (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence
Uranium mill tailings remedial action project real estate management plan
Energy Technology Data Exchange (ETDEWEB)
1994-09-01
This plan summarizes the real estate requirements of the US Department of Energy`s (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence.
Marketing plan : Dallas Integrated Corridor Management (ICM) demonstration project.
2014-01-01
North Central Texas is a unique region in terms of its combination of recent, current and projected size, growth rate, ethnic diversity, and transportation profile specifically in relation to congestion. This document summarizes a plan to market ...
Incorporating climate change projections into riparian restoration planning and design
Perry, Laura G.; Reynolds, Lindsay V.; Beechie, Timothy J.; Collins, Mathias J.; Shafroth, Patrick B.
2015-01-01
Climate change and associated changes in streamflow may alter riparian habitats substantially in coming decades. Riparian restoration provides opportunities to respond proactively to projected climate change effects, increase riparian ecosystem resilience to climate change, and simultaneously address effects of both climate change and other human disturbances. However, climate change may alter which restoration methods are most effective and which restoration goals can be achieved. Incorporating climate change into riparian restoration planning and design is critical to long-term restoration of desired community composition and ecosystem services. In this review, we discuss and provide examples of how climate change might be incorporated into restoration planning at the key stages of assessing the project context, establishing restoration goals and design criteria, evaluating design alternatives, and monitoring restoration outcomes. Restoration planners have access to numerous tools to predict future climate, streamflow, and riparian ecology at restoration sites. Planners can use those predictions to assess which species or ecosystem services will be most vulnerable under future conditions, and which sites will be most suitable for restoration. To accommodate future climate and streamflow change, planners may need to adjust methods for planting, invasive species control, channel and floodplain reconstruction, and water management. Given the considerable uncertainty in future climate and streamflow projections, riparian ecological responses, and effects on restoration outcomes, planners will need to consider multiple potential future scenarios, implement a variety of restoration methods, design projects with flexibility to adjust to future conditions, and plan to respond adaptively to unexpected change.
Wind energy and spatial planning procedures; La programmation spatiale des projects eoliens
Energy Technology Data Exchange (ETDEWEB)
NONE
2002-07-01
Wind turbines projects have been increasing, but some are very conflicted. May be it is a reason why some local authorities have to deal with different point of view, above the only energy question and including local specificity. To give local authorities the possibility to be implicated and to be in control of wind projects in their territory, wind spatial planning should permit to choose suitable areas and to optimize wind power development. In this context this synthesis presents the wind spatial planning in Finistere (France), the french regulation, some international experiences (Danish, Flemish, Walloon region, Dutch) and the different approaches of spatial planning. (A.L.B.)
UMTRA Project water sampling and analysis plan, Canonsburg, Pennsylvania. Revision 1
International Nuclear Information System (INIS)
1995-09-01
Surface remedial action was completed at the US Department of Energy (DOE) Canonsburg and Burrell Uranium Mill Tailings Remedial Action (UMTRA) Project sites in southwestern Pennsylvania in 1985 and 1987, respectively. The Burrell disposal site, included in the UMTRA Project as a vicinity property, was remediated in conjunction with the remedial action at Canonsburg. On 27 May 1994, the Nuclear Regulatory Commission (NRC) accepted the DOE final Long-Term Surveillance Plan (LTSP) (DOE, 1993) for Burrell thus establishing the site under the general license in 10 CFR section 40.27 (1994). In accordance with the DOE guidance document for long-term surveillance (DOE, 1995), all NRC/DOE interaction on the Burrell site's long-term care now is conducted with the DOE Grand Junction Projects Office in Grand Junction, Colorado, and is no longer the responsibility of the DOE UMTRA Project Team in Albuquerque, New Mexico. Therefore, the planned sampling activities described in this water sampling and analysis plan (WSAP) are limited to the Canonsburg site. This WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequencies for routine monitoring at the Canonsburg site for calendar years 1995 and 1996. Currently, the analytical data further the site characterization and demonstrate that the disposal cell's initial performance is in accordance with design requirements
Energy Technology Data Exchange (ETDEWEB)
Rosemann, Andreas [Gesellschaft fuer integrierte Systemplanung (GIS) mbH, Weinheim (Germany)
2014-07-01
Latest demands on nuclear plant inspections are the ongoing actualisation of the outage plan on the basis of the current work progress and current events as well as the permanent access to the current planning status and work process of all people involved in the outage. Modern EAM systems (EAM: Enterprise Application Management) made up ground on established project planning tools with regard to functionalities for scheduling work orders. A shift towards an integrated planning in the EAM system increases the efficiency in the outage planning and improves the communication of current states of planning. (orig.)
International Nuclear Information System (INIS)
Rosemann, Andreas
2014-01-01
Latest demands on nuclear plant inspections are the ongoing actualisation of the outage plan on the basis of the current work progress and current events as well as the permanent access to the current planning status and work process of all people involved in the outage. Modern EAM systems (EAM: Enterprise Application Management) made up ground on established project planning tools with regard to functionalities for scheduling work orders. A shift towards an integrated planning in the EAM system increases the efficiency in the outage planning and improves the communication of current states of planning. (orig.)
Mizunami Underground Research Laboratory project. Plan for fiscal year 2017
International Nuclear Information System (INIS)
Ishibashi, Masayuki; Hama, Katsuhiro; Iwatsuki, Teruki; Matsui, Hiroya; Takeuchi, Ryuji; Ikeda, Koki; Mikake, Shinichiro; Iyatomi, Yosuke; Sasao, Eiji; Koide, Kaoru
2017-10-01
The Mizunami Underground Research Laboratory (MIU) Project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of geological disposal technologies through investigations of the deep geological environment in the crystalline host rock (granite) at Mizunami, Gifu Prefecture, central Japan. On the occasion of the reform of the entire JAEA organization in 2014, JAEA identified three important issues on the geoscientific research program: 'Development of countermeasure technologies for reducing groundwater inflow', 'Development of modelling technologies for mass transport' and 'Development of drift backfilling technology', based on the latest results of the synthesizing research and development (R and D). The R and D on three remaining important issues has been carrying out on the MIU Project. This report summarizes the R and D activities planned for fiscal year 2017 on the basis of the MIU Master Plan updated in 2015 and Investigation Plan for the Third Medium to Long-term Research Phase. (author)
International Nuclear Information System (INIS)
Mctaggart, Jerri Lynne; Lott, Sheila; Gadbury, Casey
2009-01-01
Los Alamos National Laboratory, Carlsbad Office (LANL-CO), has been tasked to write Project Plans for all of the Small Quantity Sites (SQS) with defense related Transuranic (TRU) waste in the Department of Energy (DOE) complex. Transuranic Work-Off Plans were precursors to the Project Plans. LANL-CO prepared a Work-Off Plan for each small quantity site. The Work-Off Plan that identified issues, drivers, schedules, and inventory. Eight sites have been chosen to deinventory their legacy TRU waste; Bettis Atomic Power Laboratory, General Electric-Vallecitos Nuclear Center, Lawrence Berkeley National Laboratory, Lawrence Livermore National Laboratory-Area 300, Nevada Test Site, Nuclear Radiation Development, Sandia National Laboratory, and the Separations Process Research Unit. Each plan was written for contact and/or remote handled waste if present at the site. These project plans will assist the small quantity sites to ship legacy TRU waste offsite and de-inventory the site of legacy TRU waste. The DOE is working very diligently to reduce the nuclear foot print in the United States. Each of the eight SQSs will be de-inventoried of legacy TRU waste during a campaign that ends September 2011. The small quantity sites have a fraction of the waste that large quantity sites possess. During this campaign, the small quantity sites will package all of the legacy TRU waste and ship to Idaho or directly to the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico. The sites will then be removed from the Transuranic Waste Inventory if they are de-inventoried of all waste. Each Project Plan includes the respective site inventory report, schedules, resources, drivers and any issues. These project plans have been written by the difficult waste team and will be approved by each site. Team members have been assigned to each site to write site specific project plans. Once the project plans have been written, the difficult team members will visit the sites to ensure nothing has
Final Report for the Soboba Strategic Tribal Energy Planning Project
Energy Technology Data Exchange (ETDEWEB)
Miller, Kim [EPA Specialist
2013-09-17
In 2011 the Tribe was awarded funds from the Department of Energy to formulate the Soboba Strategic Tribal Energy Plan. This will be a guiding document used throughout the planning of projects focused on energy reduction on the Reservation. The Soboba Strategic Tribal Energy Plan's goal is to create a Five Year Energy Plan for the Soboba Band of Luiseno Indians in San Jacinto, California. This plan will guide the decision making process towards consistent progress leading to the Tribal goal of a 25% reduction in energy consumption in the next five years. It will additionally outline energy usage/patterns and will edentify areas the Tribe can decrease energy use and increase efficiency. The report documents activities undertaken under the grant, as well as incldues the Tribe's strategif energy plan.
Cooke, John C.; Lefor, Michael W.
1990-01-01
Roots of salt marsh plant species Spartina alterniflora, S. patens, Distichlis spicata, and others were examined for the presence of vesicular-arbuscular mycorrhizal (VAM) fungi. Samples were taken from introduced planted material in a salt marsh restoration project and from native material in adjacent marsh areas along the Indian River, Clinton, Connecticut, USA. After ten years the replanted area still has sites devoid of vegetation. The salt marsh plants introduced there were devoid of VAM fungi, while high marsh species from the adjacent undisturbed region showed consistent infection, leading the authors to suggest that VAM fungal infection of planting stocks may be a factor in the success of marsh restoration.
FY 1991 Task plans for the Hanford Environmental Dose Reconstruction Project
International Nuclear Information System (INIS)
1991-04-01
The purpose of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate radiation doses from Hanford Site operations since 1944 to populations and individuals. The objectives of work in Fiscal Year (FY) 1991 are to analyze data and models used in Phase 1 and restructure the models to increase accuracy and reduce uncertainty in dose estimation capability. Databases will be expanded and efforts will begin to determine the appropriate scope (space, time, radionuclides, pathways and individuals/population groups) and accuracy (level of uncertainty in dose estimates) for the project. Project scope and accuracy requirements, once defined, can be translated into additional model and data requirements later in the project. Task plans for FY 1991 have been prepared based on activities approved by the Technical Steering Panel (TSP) in October 1990 and mid-year revisions discussed at the TSP planning/budget workshop in February 1991. The activities can be divided into two broad categories: (1) model and data development and evaluation, (2) project, technical and communication support. 3 figs., 1 tab
Multiple Fentanyl Overdoses - New Haven, Connecticut, June 23, 2016.
Tomassoni, Anthony J; Hawk, Kathryn F; Jubanyik, Karen; Nogee, Daniel P; Durant, Thomas; Lynch, Kara L; Patel, Rushaben; Dinh, David; Ulrich, Andrew; D'Onofrio, Gail
2017-02-03
On the evening of June 23, 2016, a white powder advertised as cocaine was purchased off the streets from multiple sources and used by an unknown number of persons in New Haven, Connecticut. During a period of less than 8 hours, 12 patients were brought to the emergency department (ED) at Yale New Haven Hospital, experiencing signs and symptoms consistent with opioid overdose. The route of intoxication was not known, but presumed to be insufflation ("snorting") in most cases. Some patients required doses of the opioid antidote naloxone exceeding 4 mg (usual initial dose = 0.1-0.2 mg intravenously), and several patients who were alert after receiving naloxone subsequently developed respiratory failure. Nine patients were admitted to the hospital, including four to the intensive care unit (ICU); three required endotracheal intubation, and one required continuous naloxone infusion. Three patients died. The white powder was determined to be fentanyl, a drug 50 times more potent than heroin, and it included trace amounts of cocaine. The episode triggered rapid notification of public health and law enforcement agencies, interviews of patients and their family members to trace and limit further use or distribution of the fentanyl, immediate naloxone resupply and augmentation for emergency medical services (EMS) crews, public health alerts, and plans to accelerate naloxone distribution to opioid users and their friends and families. Effective communication and timely, coordinated, collaborative actions of community partners reduced the harm caused by this event and prevented potential subsequent episodes.
International Nuclear Information System (INIS)
Frazier, T.P.
1995-12-01
This Quality Assurance Project Plan addresses the quality assurance requirements for compiling Hanford Site radioactive airborne emissions data. These data will be reported to the U.S. Environmental Protection Agency, the US Department of Energy, and the Washington State Department of Health. Effluent Monitoring performs compliance assessments on radioactive airborne sampling and monitoring systems. This Quality Assurance Project Plan is prepared in compliance with interim guidelines and specifications. Topics include: project description; project organization and management; quality assurance objectives; sampling procedures; sample custody; calibration procedures; analytical procedures; monitoring and reporting criteria; data reduction, verification, and reporting; internal quality control; performance and system audits; corrective actions; and quality assurance reports
Closure plan for the proposed Millennium Project
International Nuclear Information System (INIS)
Tuttle, S.; Sisson, R.
1999-01-01
A $2.2 billion expansion of the current oil sands operation has been proposed by Suncor Energy Inc. The expansion would more than double the productive capacity of the present facility. As part of the application for this expansion, called Project Millennium, a comprehensive closure plan has been developed and filed by the Corporation. The Plan includes a systematic evaluation of the area to be developed, a description of the development activities planned, and the goals and objectives of the Corporation in re-establishing the landforms and ecosystems concurrently with running the operation. The Plan envisages surface contouring as early as practicable during the mine development, soil reconstruction, and re-establishment of vegetation, surface drainage and wetlands. The Corporation undertakes to monitor the performance of the reclaimed areas based on landform performance, the impact of chemical constituents on the landscape and ecosystem sustainability. An annual monitoring report assessing herbaceous vegetation growth, major species composition, tree and shrub survival and growth rate, groundwater conditions, amount of precipitation, the utility of constructed wetlands for treatment of reclamation area seepage and runoff waters, and wildlife population changes, will be prepared annually. A future research program associated with the Reclamation and Closure Plan will also examine the effectiveness of the reclamation drainage system as fish habitat, and the potential of the proposed end-pit lake to provide a viable aquatic ecosystem. 8 refs., 2 figs
Project W-314 specific test and evaluation plan for 241-AN-A valve pit
International Nuclear Information System (INIS)
Hays, W.H.
1998-01-01
The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)
International Nuclear Information System (INIS)
Xue Yabin; Cui Shaozhang; Pan Fengguo; Zhang Lizhen; Shi Yonggang
2014-01-01
This study discusses the importance of nuclear power project design and engineering methods at the preliminary stage of its development on nuclear power plant's operational safety from the professional view. Specifically, we share our understanding of national nuclear safety plan's requirement on new reactor accident probability, technology, site selection, as well as building and improving nuclear safety culture and strengthening public participation, with a focus on plan's implications on preliminary stage of nuclear power project development. Last, we introduce China Huaneng Group's work on nuclear power project preliminary development and the experience accumulated during the process. By analyzing the siting philosophy of nuclear power plant and the necessity of building nuclear safety culture at the preliminary stage of nuclear power project development, this study explicates how to fully implement the nuclear safety plan's requirements at the preliminary stage of nuclear power project development. (authors)
A Case Study of Resources Management Planning with Multiple Objectives and Projects
David L. Peterson; David G. Silsbee; Daniel L. Schmoldt
1995-01-01
Each National Park Service unit in the United States produces a resources management plan (RMP) every four years or less. The plans commit budgets and personnel to specific projects for four years, but they are prepared with little quantitative and analytical rigor and without formal decisionmaking tools. We have previously described a multiple objective planning...
Process for planning and control of software projects using XedroGESPRO
Jacqueline Marín-Sánchez; José Alejandro Lugo-García; Pedro Yobanis Piñero-Pérez; Alena María Santiesteban-García; Félix Noel Abelardo-Santana; Javier Menéndez-Rizo
2014-01-01
The software project management in Cuba has become a key area for improving production processes and decisionmaking in organizations. Several models and standards for process improvement, related with project management, proposed best practices on issues of planning and control of projects. However, they are generic guidelines that describe only those activities to execute, leaving the responsibility for implementing to organizations, using sometimes , expensive proprietary infor...
Quality assurance program plan for SNF characterization support project
International Nuclear Information System (INIS)
Tanke, J.M.
1997-01-01
This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Spent Nuclear Fuel Characterization Support Project. This QAPP has been developed specifically for the Spent Nuclear Fuel Characterization Support Project, per Letter of Instruction (LOI) from Duke Engineering and Services Company, letter No. DESH-9655870, dated Nov. 22, 1996. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP) and LOI. These activities include installation of sectioning equipment and furnace, surface and subsurface examinations, sectioning for metallography, and element drying and conditioning testing, as well as project related operations within the 327 facility as it relates to the specific activities of this project. General facility activities are covered in other appropriate QA-PPS. In addition, this QAPP supports the related quality assurance activities addressed in CM-2-14, Hazardous Material Packaging and Shipping,1261 and HSRCM-1, Hanford Site Radiological Control Manual. The 327 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a Babcock and Wilcox Hanford Company (BVMC) managed facility. During this transition process existing procedures and documents will be utilized until replaced by BVMC procedures and documents. These documents conform to the requirements found in PNL-MA-70, Quality Assurance Manual and PNL-MA-8 1, Hazardous Materials Shipping Manual. The Quality Assurance Program Index (QAPI) contained in Table 1 provides a matrix which shows how project activities relate to IO CFR 830.120 and 5700.6C criteria. Quality Assurance program requirements will be addressed separate from the requirements specified in this document. Other Hanford Site organizations/companies may be utilized in support of this project and the subject organizations are
谈项目施工的前期策划%Discussion on pre planning of project construction
Institute of Scientific and Technical Information of China (English)
谷来喜
2014-01-01
论述了项目前期策划的重要性,依据项目前期策划的基本原则,对项目策划的组织机构、施工部署、技术、质量、安全管理策划等项目施工前期策划编制的主要内容作了阐述,为项目管理提供参考依据。%This paper discussed the importance of project pre planning, based on the basic principles of project pre planning, elaborated the main contents of project planning organization, construction planning, technology, quality, safety management preparation and project construc-tion pre planning, provide reference basis for project management.
National Oceanic and Atmospheric Administration, Department of Commerce — Earth Eye collected LiDAR data for approximately 4,589 square kilometers that partially cover the Connecticut counties of Hartford, Tolland, Windham, Middlesex and...
Predictors of Nutrition Quality in Early Child Education Settings in Connecticut.
Andreyeva, Tatiana; Kenney, Erica L; O'Connell, Meghan; Sun, Xiaohan; Henderson, Kathryn E
2018-05-01
This study assessed the dietary quality of lunches and feeding practices (family-style service, teacher role modeling) in Connecticut child care centers and made comparisons by center participation in the federal Child and Adult Care Food Program (CACFP). Plate waste methods and visual observation of lunches served and consumed. A total of 97 randomly selected licensed Connecticut child care centers (53 CACFP and 44 non-CACFP). A total of 838 preschool-aged children. Total energy intake, macronutrient intake, and intake by CACFP meal component as well as use of family-style dining, management of additional helpings, and whether and what teachers consumed in view of children. Child dietary intake at lunch was compared with dietary and CACFP recommendations using a mixed linear regression model. The CACFP centers were more likely to offer family-style service and have staff eat the same foods as the children. Children in non-CACFP centers consumed more saturated fat (4.1 vs 2.7 g; P feeding practices in child care settings require further exploration in the context of serving children at risk for food insecurity and in light of recent work on responsive feeding. Copyright © 2018 Society for Nutrition Education and Behavior. Published by Elsevier Inc. All rights reserved.
Project management a systems approach to planning, scheduling, and controlling
Kerzner, Harold
2017-01-01
Project Management is the bestselling text for students and professionals, presenting a streamlined approach to project management functions in full alignment with PMI(r)'s latest Project Management Body of Knowledge (PMBOK(r)). This new 12th edition has been updated to reflect the latest changes found in the PMBOK(r) Guide--Sixth Edition, and features new coverage of emerging topics including global stakeholder management, causes of failure, agile project management, project governance failure, customer approval milestones, classifying project metrics, and more. Supplementary materials are available for students, working professionals, and instructors. * Understand organizational structures and project management functions * Learn how to control costs, manage risk, and analyze trade-offs * Examine different methods used for planning, scheduling, QA, and more * Work effectively with customers and stakeholders from around the globe Project Management is the comprehensive reference to keep within arm's reach. ...
Skene, Katherine J.; Gent, Janneane F.; McKay, Lisa A.; Belanger, Kathleen; Leaderer, Brian P.; Holford, Theodore R.
2010-12-01
An integrated exposure model was developed that estimates nitrogen dioxide (NO 2) concentration at residences using geographic information systems (GIS) and variables derived within residential buffers representing traffic volume and landscape characteristics including land use, population density and elevation. Multiple measurements of NO 2 taken outside of 985 residences in Connecticut were used to develop the model. A second set of 120 outdoor NO 2 measurements as well as cross-validation were used to validate the model. The model suggests that approximately 67% of the variation in NO 2 levels can be explained by: traffic and land use primarily within 2 km of a residence; population density; elevation; and time of year. Potential benefits of this model for health effects research include improved spatial estimations of traffic-related pollutant exposure and reduced need for extensive pollutant measurements. The model, which could be calibrated and applied in areas other than Connecticut, has importance as a tool for exposure estimation in epidemiological studies of traffic-related air pollution.
Watershed manipulation project: Field implementation plan for 1990-1992
International Nuclear Information System (INIS)
Erickson, H.; Narahara, A.M.; Rustad, L.E.; Mitchell, M.; Lee, J.
1993-02-01
The Bear Brook Watershed in Maine (BBWM) was established in 1986 at Lead Mountain, Maine as part of the Environmental Protection Agency's (EPA) Watershed Manipulation Project (WPM). The goals of the project are to: (1) assess the chemical response of a small upland forested watershed to increased loadings of SO4, (2) determine interactions among biogeochemical mechanisms controlling watershed response to acidic deposition, and (3) test the assumptions of the Direct/Delayed Response Programs (DDRP) computer models of watershed acidification. The document summarizes the field procedures used in the establishment and initial implementation of the plot- and catchment- scale activities at the BBWM, and outlines plans for 1990-02 project activities
Nuclear emergency planning in Spain. The PLABEN review project
International Nuclear Information System (INIS)
Lentijo Lentijo, J. C.; Vila Pena, M.
2002-01-01
The international rules and recommendations for nuclear emergency planning and the Spanish experience gained in the management of event with radiological risk have noticed that is necessary to review the planning radiological bases for emergencies in nuclear power plants and to define the planning radiological bases for radiological emergencies that could happen in radioactive facilities or in activities out of the regulatory framework. The paper focuses on CSN actions concerning the Plaben review project related to define the new radiological principles taking into account the current international recommendations for interventions, make a proposal about the organisation and operation of the provincial radiological action group and the national support level for radiological emergency response. (Author) 7 refs
PUREX/UO3 deactivation project management plan
International Nuclear Information System (INIS)
Washenfelder, D.J.
1993-12-01
From 1955 through 1990, the Plutonium-Uranium Extraction Plant (PUREX) provided the United States Department of Energy Hanford Site with nuclear fuel reprocessing capability. It operated in sequence with the Uranium Trioxide (UO 3 ) Plant, which converted the PUREX liquid uranium nitrate product to solid UO 3 powder. Final UO 3 Plant operation ended in 1993. In December 1992, planning was initiated for the deactivation of PUREX and UO 3 Plant. The objective of deactivation planning was to identify the activities needed to establish a passively safe, environmentally secure configuration at both plants, and ensure that the configuration could be retained during the post-deactivation period. The PUREX/UO 3 Deactivation Project management plan represents completion of the planning efforts. It presents the deactivation approach to be used for the two plants, and the supporting technical, cost, and schedule baselines. Deactivation activities concentrate on removal, reduction, and stabilization of the radioactive and chemical materials remaining at the plants, and the shutdown of the utilities and effluents. When deactivation is completed, the two plants will be left unoccupied and locked, pending eventual decontamination and decommissioning. Deactivation is expected to cost $233.8 million, require 5 years to complete, and yield $36 million in annual surveillance and maintenance cost savings
High Burnup Dry Storage Cask Research and Development Project, Final Test Plan
Energy Technology Data Exchange (ETDEWEB)
None
2014-02-27
EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel in dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.
Lapan, Richard T.; Whitcomb, Sara A.; Aleman, Nancy M.
2012-01-01
Results connect the implementation of the college and career counseling components of a comprehensive school counseling program and lower student-to-school-counselor ratios to a reduction in suspension rates and disciplinary incidents for Connecticut high school students. Principal ratings of college and career counseling services provided in…
77 FR 32898 - Safety & Security Zones; OPSAIL 2012 Connecticut, Thames River, New London, CT
2012-06-04
... 1625-AA00; AA87 Safety & Security Zones; OPSAIL 2012 Connecticut, Thames River, New London, CT AGENCY... 20, 2012 the Coast Guard published a notice of proposed rulemaking entitled Safety & Security Zones... Homeland Security Delegation No. 0170.1, which collectively authorize the Coast Guard to define safety and...
Project W-314 specific test and evaluation plan for 241-AY-02A pump pit upgrade
International Nuclear Information System (INIS)
Hays, W.H.
1998-01-01
This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-02A Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-02A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)
Project W-314 specific test and evaluation plan for 241-AY-01A pump pit upgrade
International Nuclear Information System (INIS)
Hays, W.H.
1998-01-01
This Specific Test and Evaluation Plan (STEP) defines the test and evaluation activities encompassing the upgrade of the 241-AY-0IA Pump Pit for the W-314 Project. The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AY-01A Pump Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP)
Integrating fuel treatment into ecosystem management: A proposed project planning process
Keith D. Stockmann; Kevin D. Hyde; J. Greg Jones; Dan R. Loeffler; Robin P. Silverstein
2010-01-01
Concern over increased wildland fire threats on public lands throughout the western United States makes fuel reduction activities the primary driver of many management projects. This single-issue focus recalls a management planning process practiced frequently in recent decades - a least-harm approach where the primary objective is first addressed and then plans are...
Capital planning for operating theatres based on projecting future theatre requirements.
Sheehan, Jennifer A; Tyler, Peter; Jayasinha, Hirani; Meleady, Kathleen T; Jones, Neill
2011-05-01
During 2006, NSW and ACT Health Departments jointly engaged KPMG to develop an Operating Theatre Requirements' Projection Model and an accompanying planning guideline. A research scan was carried out to identify drivers of surgical demand, theatre capacity and theatre performance, as well as locating existing approaches to modelling operating theatre requirements for planning purposes. The project delivered a Microsoft Excel-based model for projecting future operating theatre requirements, together with an accompanying guideline for use of the model and interpretation of its outputs. It provides a valuable addition to the suite of tools available to Health staff for service and capital planning. The model operates with several limitations, largely due to being data dependent, and the state and completeness of available theatre activity data. However, the operational flexibility built into the model allows users to compensate for these limitations, on a case by case basis, when the user has access to suitable, local data. The design flexibility of the model means that updating the model as improved data become available is not difficult; resulting in revisions being able to be made quickly, and disseminated to users rapidly.
Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory
Energy Technology Data Exchange (ETDEWEB)
NONE
1995-05-01
The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S&M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S&M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the IFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of IFDP facilities was initiated in FY 1994 and will be completed in FY 1999. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $36M. The costs are summarized. Upon completion of deactivation, annual S&M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.
2016-03-01
The Texas Department of Transportation (TxDOT) is the sponsor of the project. The : project goals are to: (1) produce a framework for Texas freight transportation system in : 2055 and (2) develop a set of rail planning recommendations that will be...
Systems Engineering Management Plan for Tank Farm Restoration and Safety Operations, Project W-314
International Nuclear Information System (INIS)
MCGREW, D.L.
2000-01-01
The Systems Engineering Management Plan for Project W-314 has been prepared within the guidelines of HNF-SD-WM-SEMP-002, TWRS Systems Engineering Management Plan. The activities within this SEMP have been tailored, in accordance with the TWRS SEMP and DOE Order 430.1, Life Cycle Asset Management, to meet the needs of the project
Underground Test Area Project Waste Management Plan (Rev. No. 2, April 2002)
International Nuclear Information System (INIS)
IT Corporation, Las Vegas
2002-01-01
The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office (NNSA/NV) initiated the UGTA Project to characterize the risk posed to human health and the environment as a result of underground nuclear testing activities at the Nevada Test Site (NTS). The UGTA Project investigation sites have been grouped into Corrective Action Units (CAUs) in accordance with the most recent version of the Federal Facility Agreement and Consent Order. The primary UGTA objective is to gather data to characterize the groundwater aquifers beneath the NTS and adjacent lands. The investigations proposed under the UGTA program may involve the drilling and sampling of new wells; recompletion, monitoring, and sampling of existing wells; well development and hydrologic/ aquifer testing; geophysical surveys; and subsidence crater recharge evaluation. Those wastes generated as a result of these activities will be managed in accordance with existing federal and state regulations, DOE Orders, and NNSA/NV waste minimization and pollution prevention objectives. This Waste Management Plan provides a general framework for all Underground Test Area (UGTA) Project participants to follow for the characterization, storage/accumulation, treatment, and disposal of wastes generated by UGTA Project activities. The objective of this waste management plan is to provide guidelines to minimize waste generation and to properly manage wastes that are produced. Attachment 1 to this plan is the Fluid Management Plan and details specific strategies for management of fluids produced under UGTA operations
Treatment planning systems dosimetry auditing project in Portugal.
Lopes, M C; Cavaco, A; Jacob, K; Madureira, L; Germano, S; Faustino, S; Lencart, J; Trindade, M; Vale, J; Batel, V; Sousa, M; Bernardo, A; Brás, S; Macedo, S; Pimparel, D; Ponte, F; Diaz, E; Martins, A; Pinheiro, A; Marques, F; Batista, C; Silva, L; Rodrigues, M; Carita, L; Gershkevitsh, E; Izewska, J
2014-02-01
The Medical Physics Division of the Portuguese Physics Society (DFM_SPF) in collaboration with the IAEA, carried out a national auditing project in radiotherapy, between September 2011 and April 2012. The objective of this audit was to ensure the optimal usage of treatment planning systems. The national results are presented in this paper. The audit methodology simulated all steps of external beam radiotherapy workflow, from image acquisition to treatment planning and dose delivery. A thorax CIRS phantom lend by IAEA was used in 8 planning test-cases for photon beams corresponding to 15 measuring points (33 point dose results, including individual fields in multi-field test cases and 5 sum results) in different phantom materials covering a set of typical clinical delivery techniques in 3D Conformal Radiotherapy. All 24 radiotherapy centers in Portugal have participated. 50 photon beams with energies 4-18 MV have been audited using 25 linear accelerators and 32 calculation algorithms. In general a very good consistency was observed for the same type of algorithm in all centres and for each beam quality. The overall results confirmed that the national status of TPS calculations and dose delivery for 3D conformal radiotherapy is generally acceptable with no major causes for concern. This project contributed to the strengthening of the cooperation between the centres and professionals, paving the way to further national collaborations. Copyright © 2013 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.
300 Area Revitalization Project Management Plan
International Nuclear Information System (INIS)
Downey, H. D.
1999-01-01
The 300 Area Revitalization Team has been tasked with the responsibility to develop an integrated path forward for the 300 Area, as part of a commitment stemming from the 300 Area Disposition Workshop that was held on March 17, 1998. The integrated path forward that is needed must ensure that budget, schedule, and work scopes are complementary between the Programs that are involved in the 300Area. This Project Management Plan (PMP) defines the roles and responsibilities, and the overall approach, to development of a prioritized schedule for 300 Area activities that will achieve the end-state condition
UMTRA project water sampling and analysis plan, Maybell, Colorado
International Nuclear Information System (INIS)
1994-06-01
This water sampling and analysis plan (WSAP) describes planned water sampling activities and provides the regulatory and technical basis for ground water sampling in 1994 at the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Maybell, Colorado. The WSAP identifies and justifies sampling locations, analytical parameters, and sampling frequencies at the site. The ground water data will be used for site characterization and risk assessment. The regulatory basis for the ground water and surface water monitoring activities is derived from the EPA regulations in 40 CFR Part 192 (1993) and the proposed EPA standards of 1987 (52 FR 36000). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site. This WSAP also includes a summary and the results of water sampling activities from 1989 through 1992 (no sampling was performed in 1993)
The regional (Europe) project on study of energy options using the IAEA planning methodologies
International Nuclear Information System (INIS)
Molina, P.
1997-01-01
As a means to assist developing IAEA Member States in the Europe region in the broad area of energy, electricity and nuclear power planning, a new project has been implemented as part of the IAEA Technical Cooperation Programme. This paper describes the major objectives of this regional TC project and the activities to be organized in order to provide the required assistance. Focus is made on the present workshop and the current activities sponsored by the IAEA for further developments of the IAEA planning tools for energy, electricity and nuclear power planning with emphasis on the Energy and Power Evaluation Program (ENPEP) and the Wien Automatic System Planning (WASP) packages. (author)
The regional (Europe) project on study of energy options using the IAEA planning methodologies
Energy Technology Data Exchange (ETDEWEB)
Molina, P [Division of Nuclear Power, International Atomic Energy Agency, Vienna (Austria)
1997-09-01
As a means to assist developing IAEA Member States in the Europe region in the broad area of energy, electricity and nuclear power planning, a new project has been implemented as part of the IAEA Technical Cooperation Programme. This paper describes the major objectives of this regional TC project and the activities to be organized in order to provide the required assistance. Focus is made on the present workshop and the current activities sponsored by the IAEA for further developments of the IAEA planning tools for energy, electricity and nuclear power planning with emphasis on the Energy and Power Evaluation Program (ENPEP) and the Wien Automatic System Planning (WASP) packages. (author).
UMTRA Project water sampling and analysis plan, Grand Junction, Colorado. Revision 1, Version 6
International Nuclear Information System (INIS)
1995-09-01
This water sampling and analysis plan describes the planned, routine ground water sampling activities at the Grand Junction US DOE Uranium Mill Tailings Remedial Action (UMTRA) Project site (GRJ-01) in Grand Junction, Colorado, and at the Cheney Disposal Site (GRJ-03) near Grand Junction. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequencies for the routine monitoring stations at the sites. Regulatory basis is in the US EPA regulations in 40 CFR Part 192 (1994) and EPA ground water quality standards of 1995 (60 FR 2854). This plan summarizes results of past water sampling activities, details water sampling activities planned for the next 2 years, and projects sampling activities for the next 5 years
International Nuclear Information System (INIS)
RIECK, C.A.
1999-01-01
This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive design package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization
76 FR 58840 - Central Valley Project Improvement Act; Refuge Water Management Plans
2011-09-22
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act; Refuge Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: To meet the requirements of the Central Valley Project Improvement Act of 1992 (CVPIA) and subsequent...
PREPARATION AIDS FOR THE DEVELOPMENT OF CATEGORY I QUALITY ASSURANCE PROJECT PLANS
Data collection activities performed for the Risk Reduction Engineering aboratory (RREL) of the U.S. Environmental Protection Agency are divided into tour categories, depending on the intended use of the data. uality Assurance (QA) Project Plans are written to ensure that project...
PREPARATION AIDS FOR THE DEVELOPMENT OF CATEGORY II QUALITY ASSURANCE PROJECT PLANS
Data collection activities performed for the Risk Reduction Engineering aboratory (RREL) of the U.S. Environmental Protection Agency are divided into tour categories, depending on the intended use of the data. uality Assurance (QA) Project Plans are written to ensure that project...
U.S. Department of Energy Uranium Mill Tailings Remedial Action Ground Water Project: Project plan
International Nuclear Information System (INIS)
1994-09-01
The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA Project processing sites. The compliance strategy for the processing sites must satisfy the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1987). This scope of work will entail the following activities on a site-specific basis: Develop a compliance strategy based on modification of the UMTRA Surface Project RAPs or develop Ground Water Project RAPs with NRC concurrence on the RAP and full participation of the affected states and tribes. Implement the RAP to include institutional controls, where appropriate, as an interim measure until compliance with the standards is achieved. Institute long-term verification monitoring for transfer to a separate long-term surveillance program on or before the Project end date. Prepare certification or confirmation reports and modify the long-term surveillance plan (LTSP), where needed, on those sites completed prior to the Project end date
International Nuclear Information System (INIS)
1994-09-01
The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP). The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. The QAIP is authorized and approved by the TAC Project Manager and QA manager. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization activities are carried out in a manner that will protect public health and safety, promote the success of the UMTRA Project and meet or exceed contract requirements
Sample management implementation plan: Salt Repository Project
International Nuclear Information System (INIS)
1987-01-01
The purpose of the Sample Management Implementation Plan is to define management controls and building requirements for handling materials collected during the site characterization of the Deaf Smith County, Texas, site. This work will be conducted for the US Department of Energy Salt Repository Project Office (SRPO). The plan provides for controls mandated by the US Nuclear Regulatory Commission and the US Environmental Protection Agency. Salt Repository Project (SRP) Sample Management will interface with program participants who request, collect, and test samples. SRP Sample Management will be responsible for the following: (1) preparing samples; (2) ensuring documentation control; (3) providing for uniform forms, labels, data formats, and transportation and storage requirements; and (4) identifying sample specifications to ensure sample quality. The SRP Sample Management Facility will be operated under a set of procedures that will impact numerous program participants. Requesters of samples will be responsible for definition of requirements in advance of collection. Sample requests for field activities will be approved by the SRPO, aided by an advisory group, the SRP Sample Allocation Committee. This document details the staffing, building, storage, and transportation requirements for establishing an SRP Sample Management Facility. Materials to be managed in the facility include rock core and rock discontinuities, soils, fluids, biota, air particulates, cultural artifacts, and crop and food stuffs. 39 refs., 3 figs., 11 tabs
0-6683 : develop a pavement project evaluation index to support the 4-year pavement management plan.
2013-08-01
A pavement management plan (PMP) identifies : candidate maintenance and rehabilitation (M&R) : projects for a particular roadway network over a : multi-year planning period. The PMP is a living : document because projects are reevaluated and : reprio...
Project management plan for Project W-178, 219-S secondary containment
International Nuclear Information System (INIS)
Buckles, D.I.
1995-01-01
This Project Management Plan (PMP) establishes the organizational responsibilities, control systems, and procedures for managing the execution of project activities for Project W-178, the 219-S Secondary Containment Upgrade. The scope of this project will provide the 219-S Facility with secondary containment for all tanks and piping systems. Tank 103 will be replaced with a new tank which will be designated as Tank 104. Corrosion protection shall be installed as required. The cells shall be cleaned and the surface repaired as required. The 219-S Waste Handling Facility (219-S Facility), located in the 200 West Area, was constructed in 1951 to support the 222-S Laboratory Facility. The 219-S Facility has three tanks, TK-101, TK-102, and TK-103, which receive and neutralize low level radioactive wastes from the 222-S Laboratory. For purposes of the laboratory, the different low level waste streams have been designated as high activity and intermediate activity. The 219-S Facility accumulates and treats the liquid waste prior to transferring it to SY Tank Farm in the 200-W Area. Transfers are normally made by pipeline from the 219-S Facility to the 241-SY Tank Farm. Presently transfers are being made by tanker truck to the 200-E Area Tank Farms due to the diversion box catch tank which has been removed from service
SNF sludge treatment system preliminary project execution plan
International Nuclear Information System (INIS)
Flament, T.A.
1998-01-01
The Fluor Daniel Hanford, Inc. (FDH) Project Director for the Spent Nuclear Fuel (SNF) Project has requested Numatec Hanford Company (NHC) to define how Hanford would manage a new subproject to provide a process system to receive and chemically treat radioactive sludge currently stored in the 100 K Area fuel retention basins. The subproject, named the Sludge Treatment System (STS) Subproject, provides and operates facilities and equipment to chemically process K Basin sludge to meet Tank Waste Remediation System (TWRS) requirements. This document sets forth the NHC management approach for the STS Subproject and will comply with the requirements of the SNF Project Management Plan (HNF-SD-SNFPMP-011). This version of this document is intended to apply to the initial phase of the subproject and to evolve through subsequent revision to include all design, fabrication, and construction conducted on the project and the necessary management and engineering functions within the scope of the subproject. As Project Manager, NHC will perform those activities necessary to complete the STS Subproject within approved cost and schedule baselines and turn over to FDH facilities, systems, and documentation necessary for operation of the STS
Planning and urbanistic projects – the non-author approach and issues of synergy in cooperation
Directory of Open Access Journals (Sweden)
Liljana Jankovič Grobelšek
2005-01-01
Full Text Available The article presents the non-author approach to urbanistic and planning projects. The project leader guides the entire project team, yet particular coordinators are also important. Contrary to authorship in architectural projects, in physical planning authorship is often or even always completely shared. Not only because planning projects can change significantly during adoption procedures, but mainly because there are many participating actors (designers, planners, commissioners and/or investors etc. that are involved in any project’s undertaking. Experience proves that the non-author approach is beneficial for good project management and creation of conditions for constructive cooperation within an interdisciplinary working group and with all the other contributing parties. Two tested examples are presented. Their comparison is very interesting, since the first example shows a project where good cooperation between the client, investor and designers, as well as willing interested public, conditioned quality improvements, while the second (because of the public and consequently against its interests diminished its quality significantly. Our judgement is that the quantity of the often mentioned necessity of public involvement is actually sufficient. There are no obstacles for public participation in urbanistic and physical planning, as long as the public is interested. Troubles are often triggered elsewhere – how to safeguard the common, public interest before particular publics (e.g. neighbours, the immediately affected etc..
International Nuclear Information System (INIS)
Vianello, Juliano Melquiades; Costa, Leticia; Teixeira, José Paulo
2014-01-01
There is a large gap between the planned value of investment in a project and its financial implementation. This fact creates a mismatch between the planned and effectively achieved net present value (NPV) of the project. Considering the project portfolio of a company, this could even threaten your solvency in the future. Therefore, a quantitative-risk analysis that takes into account different possible scenarios for these values of investment is extremely important to measure statistically the real value of a project. The aim of this paper is to present the reasons for this mismatch between planned and executed investments and, from this study, obtain a suitable stochastic process to generate different scenarios for these investments in the oil industry. Although the results are valid for projects in the petrochemical and refining sector, also called in the oil industry as downstream, the methodology can be applied to the upstream or even other branches of industry. - Highlights: • We measure statistically the real value of an investment project. • We present the reasons for the mismatch between planned and executed investments. • We obtain a stochastic process to generate scenarios for oil industry investments. • Results are valid for projects in the petrochemical and refining sector, downstream. • The methodology can be applied to the upstream or even other branches of industry
Idaho National Laboratory Ten-Year Site Plan Project Description Document
Energy Technology Data Exchange (ETDEWEB)
Not Listed
2012-03-01
This document describes the currently active and proposed infrastructure projects listed in Appendix B of the Idaho National Laboratory 2013-2022 Ten Year Site Plan (DOE/ID-11449). It was produced in accordance with Contract Data Requirements List I.06. The projects delineated in this document support infrastructure needs at INL's Research and Education Campus, Materials and Fuels Complex, Advanced Test Reactor Complex and the greater site-wide area. The projects provide critical infrastructure needed to meet current and future INL opereational and research needs. Execution of these projects will restore, rebuild, and revitalize INL's physical infrastructure; enhance program execution, and make a significant contribution toward reducing complex-wide deferred maintenance.
Armstrong, Philip M; Andreadis, Theodore G; Shepard, John J; Thomas, Michael C
2017-05-01
The Asian tiger mosquito (Aedes albopictus) is an invasive species and important arbovirus vector that was introduced into the U.S. in the 1980's where it continues to expand its range. Winter temperature is an important constraint to its northward expansion, with potential range limits located between the 0° and -5°C mean cold month isotherm. Connecticut is located within this climatic zone and therefore, Ae. albopictus was monitored statewide to assess its northern range expansion and to delineate where populations can stably persist. Ae. albopictus females were monitored at fixed trapping sites throughout Connecticut from June-October over a 20-year period, 1997-2016. In addition, Ae. albopictus larvae and pupae were collected from tire habitats and tires were retrieved from the field in the spring and flooded to evaluate overwintering success of hatching larvae. Ae. albopictus was first detected during statewide surveillance when a single adult female was collected in 2006. This species was not collected again until 2010 and was subsequently detected each successive year with increasing abundance and distribution except following the unusually cold winters of 2014 and 2015. Ae. albopictus mosquitoes were most abundant in urban and suburban locations along the southwestern shoreline of Connecticut; however, single specimens were occasionally detected in central parts of the state. Field-collected females were also screened for arbovirus infection yielding two isolations of Cache Valley virus and one isolation of West Nile virus, highlighting the threat posed by this mosquito. Ae. albopictus overwintered in Connecticut under mild winter conditions as shown by recovery of hatched larvae from field collected tires in spring and by early season detection of larvae and pupae. This study documents the establishment and expansion of Ae. albopictus at the northern boundary of its range in the northeastern U.S. and provides a baseline for monitoring the future spread
Directory of Open Access Journals (Sweden)
Philip M Armstrong
2017-05-01
Full Text Available The Asian tiger mosquito (Aedes albopictus is an invasive species and important arbovirus vector that was introduced into the U.S. in the 1980's where it continues to expand its range. Winter temperature is an important constraint to its northward expansion, with potential range limits located between the 0° and -5°C mean cold month isotherm. Connecticut is located within this climatic zone and therefore, Ae. albopictus was monitored statewide to assess its northern range expansion and to delineate where populations can stably persist.Ae. albopictus females were monitored at fixed trapping sites throughout Connecticut from June-October over a 20-year period, 1997-2016. In addition, Ae. albopictus larvae and pupae were collected from tire habitats and tires were retrieved from the field in the spring and flooded to evaluate overwintering success of hatching larvae. Ae. albopictus was first detected during statewide surveillance when a single adult female was collected in 2006. This species was not collected again until 2010 and was subsequently detected each successive year with increasing abundance and distribution except following the unusually cold winters of 2014 and 2015. Ae. albopictus mosquitoes were most abundant in urban and suburban locations along the southwestern shoreline of Connecticut; however, single specimens were occasionally detected in central parts of the state. Field-collected females were also screened for arbovirus infection yielding two isolations of Cache Valley virus and one isolation of West Nile virus, highlighting the threat posed by this mosquito. Ae. albopictus overwintered in Connecticut under mild winter conditions as shown by recovery of hatched larvae from field collected tires in spring and by early season detection of larvae and pupae.This study documents the establishment and expansion of Ae. albopictus at the northern boundary of its range in the northeastern U.S. and provides a baseline for monitoring
National Oceanic and Atmospheric Administration, Department of Commerce — Earth Eye collected LiDAR data for approximately 1,703 square kilometers that partially cover the Connecticut counties of Litchfield and Fairfield. The nominal pulse...
Project Plan for the evaluation of REDC waste for TRU-waste radionuclides
International Nuclear Information System (INIS)
Nguyen, L.; Yong, L.; Chapman, J.
1996-09-01
This project plan describes the plan to determine whether the solid radioactive wastes generated by the Radiochemical Engineering Development Center (REDC) meet the Department of Energy's definition of transuranic wastes. Existing waste characterization methods will be evaluated, as well as historical data, and recommendations will be made as necessary
Removal Action Plan for the Accelerated Retrieval Project for a Described Area within Pit 4
International Nuclear Information System (INIS)
A. M. Tyson
2006-01-01
This Removal Action Plan documents the plan for implementation of the Comprehensive Environmental Response, Compensation, and Liability Act non-time-critical removal action to be performed by the Accelerated Retrieval Project. The focus of the action is the limited excavation and retrieval of selected waste streams from a designated portion of the Radioactive Waste Management Complex Subsurface Disposal Area that are contaminated with volatile organic compounds, isotopes of uranium, or transuranic radionuclides. The selected retrieval area is approximately 0.2 ha (1/2 acre) and is located in the eastern portion of Pit 4. The proposed project is referred to as the Accelerated Retrieval Project. This Removal Action Plan details the major work elements, operations approach, and schedule, and summarizes the environmental, safety and health, and waste management considerations associated with the project
Project specific quality assurance plan for Project W-178, 219-S secondary containment
International Nuclear Information System (INIS)
Buckles, D.I.
1994-01-01
The scope of this Quality Assurance Program Plan (QAPP) is to provide a system of Quality Assurance reviews and verifications on the design, procurement and construction of the 219-S Secondary Containment Upgrade. The reviews and verifications will be on activities associated with design, procurement, and construction of the Secondary Containment Upgrade which includes, but is not limited to demolition, removal, new tank installation, tank 103 isolation, tank cell refurbishment, electrical, instrumentation, piping/tubing including supports, pump and valves, and special coatings. The full project scope is defined in the project Functional Design Criteria (FDC), SD-W178-FDC-001, and all activities must be in compliance with this FDC and related design documentation
Managing uncertainty in flood protection planning with climate projections
Directory of Open Access Journals (Sweden)
B. Dittes
2018-04-01
Full Text Available Technical flood protection is a necessary part of integrated strategies to protect riverine settlements from extreme floods. Many technical flood protection measures, such as dikes and protection walls, are costly to adapt after their initial construction. This poses a challenge to decision makers as there is large uncertainty in how the required protection level will change during the measure lifetime, which is typically many decades long. Flood protection requirements should account for multiple future uncertain factors: socioeconomic, e.g., whether the population and with it the damage potential grows or falls; technological, e.g., possible advancements in flood protection; and climatic, e.g., whether extreme discharge will become more frequent or not. This paper focuses on climatic uncertainty. Specifically, we devise methodology to account for uncertainty associated with the use of discharge projections, ultimately leading to planning implications. For planning purposes, we categorize uncertainties as either visible, if they can be quantified from available catchment data, or hidden, if they cannot be quantified from catchment data and must be estimated, e.g., from the literature. It is vital to consider the hidden uncertainty, since in practical applications only a limited amount of information (e.g., a finite projection ensemble is available. We use a Bayesian approach to quantify the visible uncertainties and combine them with an estimate of the hidden uncertainties to learn a joint probability distribution of the parameters of extreme discharge. The methodology is integrated into an optimization framework and applied to a pre-alpine case study to give a quantitative, cost-optimal recommendation on the required amount of flood protection. The results show that hidden uncertainty ought to be considered in planning, but the larger the uncertainty already present, the smaller the impact of adding more. The recommended planning is
Managing uncertainty in flood protection planning with climate projections
Dittes, Beatrice; Špačková, Olga; Schoppa, Lukas; Straub, Daniel
2018-04-01
Technical flood protection is a necessary part of integrated strategies to protect riverine settlements from extreme floods. Many technical flood protection measures, such as dikes and protection walls, are costly to adapt after their initial construction. This poses a challenge to decision makers as there is large uncertainty in how the required protection level will change during the measure lifetime, which is typically many decades long. Flood protection requirements should account for multiple future uncertain factors: socioeconomic, e.g., whether the population and with it the damage potential grows or falls; technological, e.g., possible advancements in flood protection; and climatic, e.g., whether extreme discharge will become more frequent or not. This paper focuses on climatic uncertainty. Specifically, we devise methodology to account for uncertainty associated with the use of discharge projections, ultimately leading to planning implications. For planning purposes, we categorize uncertainties as either visible, if they can be quantified from available catchment data, or hidden, if they cannot be quantified from catchment data and must be estimated, e.g., from the literature. It is vital to consider the hidden uncertainty, since in practical applications only a limited amount of information (e.g., a finite projection ensemble) is available. We use a Bayesian approach to quantify the visible uncertainties and combine them with an estimate of the hidden uncertainties to learn a joint probability distribution of the parameters of extreme discharge. The methodology is integrated into an optimization framework and applied to a pre-alpine case study to give a quantitative, cost-optimal recommendation on the required amount of flood protection. The results show that hidden uncertainty ought to be considered in planning, but the larger the uncertainty already present, the smaller the impact of adding more. The recommended planning is robust to moderate changes in
From cure to custodianship of the insane poor in nineteenth-century Connecticut.
Goodheart, Lawrence B
2010-01-01
Connecticut was the exception among the Northeastern and Middle Atlantic states in not founding a public institution for the insane until after the Civil War when it opened the Hospital for the Insane at Middletown in 1868, a facility previously neglected by scholars. The state had relied on the expedient of subsidizing the impoverished at the private Hartford Retreat for the Insane that overtaxed that institution and left hundreds untreated. Despite abundant evidence to the contrary, well meaning officials oversold the idea that the Middletown site would promote cures and be cost effective. A number of unanticipated consequences occurred that mirrored fundamental changes in nineteenth-century psychiatry. The new hospital swelled by 1900 to over 2,000 patients, the largest in New England. Custodianship at the monolithic hospital became the norm. The hegemony of monopoly capitalism legitimated the ruling idea that bigger institutions were better and was midwife to the birth of eugenic responses. Class based psychiatry--the few rich at the Retreat and the many poor at Middletown--was standard as it was in other aspects of the Gilded Age. Public policy toward the insane poor in Connecticut represents an outstanding example of the transition from antebellum romanticism to fin de siècle fatalism.
International Nuclear Information System (INIS)
2000-01-01
This plan addresses project activities encompassed by the U.S. Department of Energy/Nevada Operations Office Waste Management Division and conforms to the requirements contained in the ''Life Cycle Asset Management,'' U.S. Department of Energy Order O430.1A; the Joint Program Office Policy on Project Management in Support of DOE Order O430.1, and the Project Execution and Engineering Management Planning Guide. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the state of Nevada; and traditional project management philosophies such as the development of life cycle costs, schedules, and work scope; identification of roles and responsibilities; and baseline management and controls
2016-03-01
The Texas Department of Transportation (TxDOT) is the sponsor of the project. The : project goals are to: (1) produce a framework for Texas freight transportation system in : 2055 and (2) develop a set of rail planning recommendations that will be...
Remedial action and waste disposal project - ERDF readiness evaluation plan
International Nuclear Information System (INIS)
Casbon, M.A.
1996-06-01
This Readiness Evaluation Report presents the results of the project readiness evaluation to assess the readiness of the Environmental Restoration and Disposal Facility. The evaluation was conducted at the conclusion of a series of readiness activities that began in January 1996. These activities included completion of the physical plant; preparation, review, and approval of operating procedures; definition and assembly of the necessary project and operational organizations; and activities leading to regulatory approval of the plant and operating plans
Energy Technology Data Exchange (ETDEWEB)
Yde, Chis
1990-06-01
The Libby hydroelectric project, located on the Kootenai River in northwestern Montana, resulted in several impacts to the wildlife communities which occupied the habitats inundated by Lake Koocanusa. Montana Department of Fish, Wildlife and Parks, in cooperation with the other management agencies, developed an impact assessment and a wildlife and wildlife habitat mitigation plan for the Libby hydroelectric facility. In response to the mitigation plan, Bonneville Power Administration funded a cooperative project between the Kootenai National Forest and Montana Department of Fish, Wildlife and Parks to develop a long-term habitat enhancement plan for the bighorn sheep and mule deer winter and spring ranges adjacent to Lake Koocanusa. The project goal is to rehabilitate 3372 acres of bighorn sheep and 16,321 acres of mule deer winter and spring ranges on Kootenai National Forest lands adjacent to Lake Koocanusa and to monitor and evaluate the effects of implementing this habitat enhancement work. 2 refs.
International Nuclear Information System (INIS)
Nelson, J.G.; Castillo, C.; Huntsman, J.; Killoy, S.; Lucek, H.; Marks, T.C.
2011-01-01
Faced with the Department of Energy (DOE) Complex Transformation, National Nuclear Security Administration (NNSA) was tasked with developing an integrated plan for the decommissioning of over 400 facilities and 300 environmental remediation units, as well as the many reconfiguration and modernization projects at the Oak Ridge National Laboratory (ORNL) and Y-12 Complex. Manual scheduling of remediation activities is time-consuming and inherently introduces bias of the scheduler or organization into the process. Clearly a well-defined process, quantitative risk-based tool was needed to develop an objective, unbiased baseline sequence and schedule with a sound technical foundation for the Integrated Facility Disposition Project (IFDP). Faced with limited available data, innovation was needed to extrapolate intelligent relative data for key risk parameters based on known data elements. The IFDP Supermodel was customized and expanded to provide this capability for conceptual planning of diverse project portfolios and multiple sites. (author)
Los Alamos National Laboratory transuranic waste quality assurance project plan. Revision 1
International Nuclear Information System (INIS)
1997-01-01
This Transuranic (TRU) Waste Quality Assurance Project Plan (QAPjP) serves as the quality management plan for the characterization of transuranic waste in preparation for certification and transportation. The Transuranic Waste Characterization/Certification Program (TWCP) consists of personnel who sample and analyze waste, validate and report data; and provide project management, quality assurance, audit and assessment, and records management support, all in accordance with established requirements for disposal of TRU waste at the Waste Isolation Pilot Plant (WIPP) facility. This QAPjP addresses how the TWCP meets the quality requirements of the Carlsbad Area Office (CAO) Quality Assurance Program Description (QAPD) and the technical requirements of the Transuranic Waste Characterization Quality Assurance Program Plan (QAPP). The TWCP characterizes and certifies retrievably stored and newly generated TRU waste using the waste selection, testing, sampling, and analytical techniques and data quality objectives (DQOs) described in the QAPP, the Los Alamos National Laboratory Transuranic Waste Certification Plan (Certification Plan), and the CST Waste Management Facilities Waste Acceptance Criteria and Certification [Los Alamos National Laboratory (LANL) Waste Acceptance Criteria (WAC)]. At the present, the TWCP does not address remote-handled (RH) waste
Hassel, Bryan C.; Doyle, Daniela
2009-01-01
Thirty years ago, the Connecticut Supreme Court forced our state to take stock of its system for funding schools. Our poorest towns had thousands of dollars less per child to spend. Today, our poorest districts spend roughly the same as our richest, but Connecticut's poor children still score far below their wealthy peers. Our school finance…
Environmental permits and approvals plan for high-level waste interim storage, Project W-464
International Nuclear Information System (INIS)
Deffenbaugh, M.L.
1998-01-01
This report discusses the Permitting Plan regarding NEPA, SEPA, RCRA, and other regulatory standards and alternatives, for planning the environmental permitting of the Canister Storage Building, Project W-464
77 FR 27713 - Agenda and Notice of Public Meeting of the Connecticut Advisory Committee
2012-05-11
... meeting of the Connecticut State Advisory Committee will convene at 10:30 a.m. on Friday, May 25, 2012 at... office by Monday, June 25, 2012. Comments may be mailed to the Eastern Regional Office, U.S. Commission on Civil Rights, 624 9th Street NW., Suite 740, Washington, DC 20425, faxed to (202) 376-7548, or...
Development of a biogas planning tool for project owners
DEFF Research Database (Denmark)
Fredenslund, Anders Michael; Kjær, Tyge
are considered: Combined heat and power and natural gas grid injection. The main input to the model is the amount and types of substrates available for anaerobic digestion. By substituting the models’ default values with more project specific information, the model can be used in a biogas projects later phases......A spreadsheet model was developed, which can be used as a tool in the initial phases of planning a centralized biogas plant in Denmark. The model assesses energy production, total plant costs, operational costs and revenues and effect on greenhouse gas emissions. Two energy utilization alternatives...
Computational methods for planning and evaluating geothermal energy projects
International Nuclear Information System (INIS)
Goumas, M.G.; Lygerou, V.A.; Papayannakis, L.E.
1999-01-01
In planning, designing and evaluating a geothermal energy project, a number of technical, economic, social and environmental parameters should be considered. The use of computational methods provides a rigorous analysis improving the decision-making process. This article demonstrates the application of decision-making methods developed in operational research for the optimum exploitation of geothermal resources. Two characteristic problems are considered: (1) the economic evaluation of a geothermal energy project under uncertain conditions using a stochastic analysis approach and (2) the evaluation of alternative exploitation schemes for optimum development of a low enthalpy geothermal field using a multicriteria decision-making procedure. (Author)
THE PLANNING OF A CUSTOMER RELATIONSHIP MANAGEMENT PROJECT: REQUIREMENTS AND OPPORTUNITIES
Directory of Open Access Journals (Sweden)
Adriana OLARU
2007-01-01
Full Text Available After a brief presentation of the aspects regarding the planning of a customer relationship management (CRM project, we emphasize the factors that assure the success of such an approach. In order to obtain the attended results, an organization needs the best selection of the project manager and the most efficient teamwork, which implies employees from the company’s departments and also IT specialists. In the final part, we made appreciations concerning the efficiency of a CRM project and the opportunities created by its implementation.
Bibliography of Connecticut Advanced Nuclear Engineering Laboratory reports
Energy Technology Data Exchange (ETDEWEB)
NONE
1965-12-01
This report, published in two volumes, is a bibliography of the reports published at the Connecticut Advanced Nuclear Engineering Laboratory (CANEL). The reports cover the period 1952 through 1965 and include the Aircraft Nuclear Propulsion program, the Advanced Liquid Metal Cooled Reactor program, the Advanced Reactor Materials program and the SNAP-50 program. The bibliography contains the report number, title, author, date published, and classification. In some cases where the writing of a report was a group effort, and in some reports containing compilations of certain types of data, the author column is not applicable. This is indicated by a {open_quotes}n.a.{close_quotes} in the author column. The following types of reports are included: PWAC`s, TIM`s, CNLM`s, FXM`s and miscellaneous reports. PWAC and TIM reports conform to the requirements of AEC Manual Chapter 3202-041 and 3202-042, respectively. Most of the technical information of interest generated by this project is documented in these reports. CNLM and FXM reports were written primarily for internal distribution. However, these reports contain enough information of technical interest to warrant their inclusion. All CNLM`s and those FXM`s considered to be of interest are included in this bibliography. The MPR`s (Monthly Progress Reports) are the most important of the miscellaneous categories of reports. The other miscellaneous categories relate primarily to equipment and reactor specifications. The Division of Technical Information Extension (DTIE) at Oak Ridge, Tennessee has been designated as the primary recipient of the reports in the CANEL library. When more than one copy of a report was available, the additional copies were delivered to the Lawrence Radiation Laboratory, Livermore, California.
Bibliography of Connecticut Advanced Nuclear Engineering Laboratory reports
Energy Technology Data Exchange (ETDEWEB)
NONE
1965-12-01
This report, published in two, volumes, is a bibliography of the reports published at the Connecticut Advanced Nuclear Engineering Laboratory (CANEL). The reports cover the period 1952 through 1965 and include the Aircraft Nuclear Propulsion program, the Advanced Liquid Metal Cooled Reactor program, the Advanced Reactor Materials program and the SNAP-50 program. The bibliography contains the report number, title, author, date published, and classification. In some cases where the writing of a report was a group effort, and in some reports containing compilations of certain types of data, the author column is not applicable. This is indicated by a {open_quotes}n.a.{close_quotes} in the author column. The following types of reports are included: PWAC`s, TIM`s, CNLM`s. FXM`s and miscellaneous reports. PWAC and TIM reports conform to the requirements of AEC Manual Chapter 3202-041 and 3202-042, respectively. Most of the technical information of interest generated by this project is documented in these reports, CNLM and FXM reports were written primarily for internal distribution. However, these reports contain enough information of technical interest to warrant their inclusion. All CNLM`s and those FXM`s considered to be of interest are included in this bibliography. The MPR`s (Monthly Progress Reports) are the most important of the miscellaneous categories of reports. The other miscellaneous categories relate primarily to equipment and reactor specifications. The Division of Technical Information Extension (DTIE) at Oak Ridge, Tennessee has been designated as the primary recipient of the reports in the CANEL library. When more than one copy of a report was available, the additional copies were delivered to the Lawrence Radiation Laboratory, Livermore, California.
Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan
Energy Technology Data Exchange (ETDEWEB)
MITCHELL, R.L.
2000-01-10
The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.
QUEST2: Project plan for preliminary analysis/system architecture phase (PA/SA)
International Nuclear Information System (INIS)
Braaten, F.D.
1995-01-01
This Project Management Plan combines the project management deliverables from the P+ methodology that are applicable to this part of the QUEST2 work. This consolidation reflects discussions with WHC QA regarding an appropriate method for ensuring that P+ deliverables fulfill the intent of WHC-CM-3-10 and QR-19
Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan
International Nuclear Information System (INIS)
MITCHELL, R.L.
2000-01-01
The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels
Project W-314 specific test and evaluation plan for 241-AN-A valve pit
International Nuclear Information System (INIS)
Hays, W.H.
1997-01-01
The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AN-A Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system's performance to the established Project design criteria. The STEP is a ''lower tier'' document based on the W-314 Test and Evaluation Plan (TEP) This STEP encompasses all testing activities required to demonstrate compliance to the project design criteria as it relates to the modifications of the AN-A valve pit. The Project Design Specifications (PDS) identify the specific testing activities required for the Project. Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the modifications to the 241-AN-A Valve Pit. The STEP will be utilized in conjunction with the TEP for verification and validation
UMTRA Project water sampling and analysis plan, Salt Lake City, Utah. Revision 1
International Nuclear Information System (INIS)
1995-06-01
This water sampling and analysis plan describes planned, routine ground water sampling activities at the US Department of Energy Uranium Mill Tailings Remedial Action Project site in Salt Lake City, Utah. This plan identifies and justifies sampling locations, analytical parameters, detection limits, and sampling frequencies for routine monitoring of ground water, sediments, and surface waters at monitoring stations on the site
Guidelines for the development of a Project Data Management Plan (PDMP)
Green, James L.; King, Joseph H.
1988-01-01
The purpose of this document is to assist NASA Project personnel in the preparation of their Project Data Management Plans (PDMP) in accordance with NASA Management Instruction (NMI) 8030.3A. In addition, this report summarizes the scope of a PDMP and establishes important aspects that must be addressed for the long term management and archiving of the data from a NASA space flight investigation.
Walsh, Gregory J.; Scott, Robert B.; Aleinikoff, John N.; Armstrong, Thomas R.
2006-01-01
This report presents a preliminary map of the bedrock geology of the Old Lyme quadrangle, New London and Middlesex Counties, Connecticut. The map depicts contacts of bedrock geologic units, faults, outcrops, and structural geologic information. The map was published as part of a study of fractured bedrock aquifers and regional tectonics.
International Nuclear Information System (INIS)
Stauffer, M.
1995-11-01
This quality assurance project plan (QAPP) applies specifically to the field activities and laboratory analysis performed for all RCRA groundwater projects conducted by Hanford Technical Services. This QAPP is generic in approach and shall be implemented in conjunction with the specific requirements of individual groundwater monitoring plans
NSGIC Education | GIS Inventory — Aerial Photography and Imagery, Ortho-Corrected dataset current as of 2004. Leaf-on September 2004 0.5m resolution CIR orthoimagery that covers Connecticut's coastal...
NSGIC Education | GIS Inventory — Aerial Photography and Imagery, Ortho-Corrected dataset current as of 2004. Leaf-on September 2004 0.5m resolution RGB orthoimagery that covers Connecticut's coastal...
Project W-521, waste feed delivery systems environmental permits and approvals plan
International Nuclear Information System (INIS)
TOLLEFSON, K.S.
1999-01-01
This document has been prepared to define the specific environmental requirements applicable to Project W-521. The document describes the permits and approvals necessary for the project to design, construct, and install planned upgrades, and provides a schedule of activities and provides cost estimates to complete the required permitting and approval activities
Large-scale projects between regional planning and environmental protection
International Nuclear Information System (INIS)
Schmidt, G.
1984-01-01
The first part of the work discusses the current law of land-use planning, municipal and technical construction planning, and licensing under the atomic energy law and the federal law on immission protection. In the second part some theses suggesting modifications are submitted. In the sector of land-use planning substantial contributions to the protection of the environment can only be expected from programs and plans (aims). For the environmental conflicts likely to arise from large-scale projects (nuclear power plant, fossil-fuel power plant) this holds good for the most part of site selection plans. They have bearings on environmental protection in that they presuppose thorough examination of facts, help to recognize possible conflicts at an early date and provide a frame for solving those problems. Municipal construction planning is guided by the following principles: Environmental protection is an equivalent planning target. Environmental data and facts and their methodical processing play a fundamental part as they constitute the basis of evaluation. Under the rules and regulations of the federal law on immission protection, section 5, number 2 - prevention of nuisances - operators are obliged to take preventive care of risks. That section is not concerned with planning or distribution. Neither does the licensing of nuclear plants have planning character. So far as the legal preconditions of licensing are fulfilled, the scope for rejection of an application under section 7, subsection 2 of the atomic energy law in view of site selection and requirement of a plant hardly carries any practical weight. (orig./HP) [de
Automated Procurement System (APS) revised project management plan (DS-03)
Murphy, Diane R.
1995-01-01
The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.
Expedited technology demonstration project. Project baseline revision 2.2 and FY96 plan
International Nuclear Information System (INIS)
1996-07-01
The Expedited Technology Demonstration Project Plan, Mixed Waste Management Facility (MWMF) current baseline. The revised plan will focus efforts specifically on the demonstration of an integrated Molten Salt Oxidation (MSO) system. In addition to the MSO primary unit, offgas, and salt recycle subsystems, the demonstrations will include feed preparation and feed delivery systems, and the generation of robust final forms from process mineral residues. A simplified process flow chart for the expedited demonstration is provided. To minimize costs and to accelerate the schedule for deployment, the integrated system will be staged in an existing facility at LLNL equipped to handle hazardous and radioactive materials. The MSO systems will be activated in fiscal year 97, followed by the activation of feed preparation and final forms in fiscal year 98
S. Verweij (Stefan); I.F. van Meerkerk (Ingmar); J.F.M. Koppenjan (Joop); H. Geerlings (Harry)
2014-01-01
markdownabstract__Abstract__ Urban planning projects are planned and organized through arrangements between actors. These arrangements are institutional interventions: they intervene in the institutional landscape as existing organizational boundaries are (temporarily) redrawn. Such boundary
New England Wind Energy Education Project (NEWEEP)
Energy Technology Data Exchange (ETDEWEB)
Grace, Robert C.; Craddock, Kathryn A.; von Allmen, Daniel R.
2012-04-25
to form a Steering Committee consists of the Massachusetts Renewable Energy Trust; Maine Public Utilities Commission; New Hampshire office of Energy & Planning, the Connecticut Clean Energy Fund;, ISO New England; Utility Wind Interest Group; University of Massachusetts Wind Energy Center; Renewable Energy New England (a new partnership between the renewable energy industry and environmental public interest groups), and Lawrence Berkeley National Laboratory (conditionally). The Steering Committee will: (1) identify and prioritize topics of greatest interest or concern where detailed, objective and accurate information will advance the dialogue in the region; (2) identify critical outreach venues, influencers and experts; (3) direct and coordinate project staff; (4) assist project staff in planning briefings and conferences described below; (5) identify topics needing additional research or technical assistance and (6) identify and recruit additional steering committee members. Impacts/Benefits/Outcomes: By cutting through the clutter of competing and conflicting information on critical issues, this project is intended to encourage the market's acceptance of appropriately-sited wind energy generation.
International Nuclear Information System (INIS)
Wecks, M.D.
1998-01-01
The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-46 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan. (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented
International Nuclear Information System (INIS)
Kaspar, J.R.; Latray, D.A.
1998-01-01
The Systems Engineering Management and Implementation Plan (SEMIP) for TWRS Project W-465 describes the project implementation of the Tank Waste Remediation System Systems Engineering Management Plan (TWRS SEMP), Rev. 1. The SEMIP outlines systems engineering (SE) products and processes to be used by the project for technical baseline development. A formal graded approach is used to determine the products necessary for requirements, design, and operational baseline completion. SE management processes are defined, and roles and responsibilities for management processes and major technical baseline elements are documented
Baird, Aaron; Riggins, Frederick J.
2012-01-01
An increasing number of information systems projects in industry are managed using hybrid project management methodologies, but this shift in project management methods is not fully represented in our CIS curriculums. CIS capstone courses often include an applied project that is managed with traditional project management methods (plan first,…
International Nuclear Information System (INIS)
1994-06-01
This quality assurance project plan (QAPjP) describes the measures that shall be taken to ensure that the environmental data collected during characterization and closure activities of Resource Conservation and Recovery Act (RCRA) Industrial Sites at the Nevada Test Site (NTS) are meaningful, valid, defensible, and can be used to achieve project objectives. These activities are conducted by the US Department of Energy Nevada Operations Office (DOE/NV) under the Nevada Environmental Restoration (ER) Project. The Nevada ER Project consists of environmental restoration activities on the NTS, Tonopah Test Range, Nellis Air Force Range, and eight sites in five other states. The RCRA Industrial Sites subproject constitutes a component of the Nevada ER Project. Currently, this QAPjP is limited to the seven RCRA Industrial Sites identified within this document that are to be closed under an interim status and pertains to all field- investigation, analytical-laboratory, and data-review activities in support of these closures. The information presented here supplements the RCRA Industrial Sites Project Management Plan and is to be used in conjunction with the site-specific subproject sampling and analysis plans
Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453
International Nuclear Information System (INIS)
MCGRATH, G.M.
2000-01-01
This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland, Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-99. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 30 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration
Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453
Energy Technology Data Exchange (ETDEWEB)
HOLSTEIN, W.A.
1999-08-01
This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-96. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 50 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.
Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453
Energy Technology Data Exchange (ETDEWEB)
MCGRATH, G.M.
2000-06-21
This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland, Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-99. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 30 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.
Aufmuth, Joe
2018-01-01
Data management plans are created to satisfy funding agency proposal requirements related to the data life cycle. Once an award is made researchers must implement the plan they described. But how is this best accomplished? The presentation UF’s Lone Cabbage Oyster Reef Restoration Project: a use case in implementing a data management plan (DMP) describes how PI's for this grant funded research project are achieving its data management plan goals using an academic library's consulting team.
Design and implementation of a financial planning and tracking system for the Nova Project
International Nuclear Information System (INIS)
Holcomb, F.
1982-01-01
The Nova project is a 185 million dollar DOE funded project to build an experimental facility to demonstrate the thermonuclear ignition of laser fusion targets. This paper describes the design and implementation considerations for the project's computerized performance measurement financial planning and tracking system and critiques its actual operation
Drafting a monitoring plan for the ROAD project under the EU CCS directive
Steegs, T.P.H.; Neelse, F.P.; Gittins, C.; Ros, M.
2014-01-01
The Rotterdam Capture and Storage Demonstration Project (ROAD) is an integrated CCS project in the Netherlands that has recently completed the storage permitting process. Development of the monitoring and contingency plans is a key component of this process. Our paper discusses the development of
The 3D Elevation Program: summary for Connecticut
Carswell, William J.
2015-01-01
Elevation data are essential to a broad range of applications, including forest resources management, wildlife and habitat management, national security, recreation, and many others. For the State of Connecticut, elevation data are critical for coastal zone management, flood risk management, natural resources conservation, agriculture and precision farming, sea level rise and subsidence, and other business uses. Today, high-density light detection and ranging (lidar) data are the primary sources for deriving elevation models and other datasets. Federal, State, Tribal, and local agencies work in partnership to (1) replace data that are older and of lower quality and (2) provide coverage where publicly accessible data do not exist. A joint goal of State and Federal partners is to acquire consistent, statewide coverage to support existing and emerging applications enabled by lidar data.
Construction quality assurance program plan for the WIPP project, Carlsbad, NM
International Nuclear Information System (INIS)
1987-05-01
The purpose of this plan is to describe the Quality Assurance (QA) Program to be established and implemented by the US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Project Office (WPO) and by the Major Project Participants: the Architect-Engineer (Bechtel), the Construction Manager (US Army Corps of Engineers), the Scientific Advisor (Sandia National Laboratory), and the Management and Operating Contractor (Westinghouse Electric Corporation). This plan addresses the construction, including site evaluation, design, and turnover phases of WIPP. Other work in progress during the same period is controlled by DOE documents applicable to that work effort. The prime responsibility for ensuring the quality of construction rests with the DOE WIPP Project Office and is implemented through the combined efforts of the Construction Manager, the Construction Contractors, the Management and Operating Contractor, and the Architect-Engineer. Inspection and burden of proof of acceptability rests with the Construction Contractor as defined by the technical provisions of the contract and as otherwise specified by the DOE WIPP Project Office on an individual work-package basis. To the maximum extent possible, acceptance of work will be based upon first-hand witnessing by the Construction Manager and other representatives of the DOE organization
International Nuclear Information System (INIS)
VAN BEEK, J.E.
2000-01-01
This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211