WorldWideScience

Sample records for project phase ii

  1. Military Family Coping Project - Phase II

    Science.gov (United States)

    2015-05-01

    Anxiety, Life Satisfaction , Addiction, Trauma 4 The Military Family Coping Project reflects two phases. The first consisted of a series of focus...need for and guided the work of the Military Family Coping Project Phase II funded by TATRC. The Military Family Coping Project Phase II was...solidarity. For the purposes of family functioning analyses, married and unmarried soldiers were analyzed separately because marital status affects

  2. Brazilian Decimetric Array (BDA) project - Phase II

    Science.gov (United States)

    Faria, C.; Stephany, S.; Sawant, H. S.; Cecatto, J. R.; Fernandes, F. C. R.

    2010-02-01

    The configuration of the second phase of the Brazilian Decimetric Array (BDA), installed at Cachoeira Paulista, Brazil (Longitude 45° 0‧ 20″ W and Latitude 22° 41‧ 19″ S), is a T-shaped array where 21 antennas are being added to existing 5 antennas of the first phase. In the third phase, in each arm of the T array, four more antennas will be added and baselines will be increased to 2.5 × 1.25 km in east-west and south directions, respectively. The antennas will be equally spaced at the distances of 250 meters from the central antenna of the T-array. Also, the frequency range will be increased to 1.2-1.7, 2.8 and 5.6 GHz. The Second phase of the BDA should be operational by the middle of 2010 and will operate in the frequency range of (1.2-1.7) GHz for solar and non solar observations. Here, we present the characteristics of the second phase of the BDA project, details of the array configuration, the u-v coverage, the synthesized beam obtained for the proposed configuration.

  3. Sears Point Tidal Marsh Restoration Project: Phase II

    Science.gov (United States)

    Information about the SFBWQP Sears Point Tidal Marsh Restoration Project: Phase II, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  4. Savanna ecosystem project: phase I summary and phase II progress

    CSIR Research Space (South Africa)

    Huntely, BJ

    1978-07-01

    Full Text Available A summary of the results of the first phase (mid 1974 to mid 1976) of the South African Savanna Ecosystem Project being undertaken at Nylsvley in the northern Transvaal is presented. Phase I of this ten year study of the structure and functioning...

  5. TA 55 Reinvestment Project II Phase C Update Project Status May 23, 2017

    Energy Technology Data Exchange (ETDEWEB)

    Giordano, Anthony P. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-05-25

    The TA-55 Reinvestment Project (TRP) II Phase C is a critical infrastructure project focused on improving safety and reliability of the Los Alamos National Laboratory (LANL) TA-55 Complex. The Project recapitalizes and revitalizes aging and obsolete facility and safety systems providing a sustainable nuclear facility for National Security Missions.

  6. Test Plan for Hydrogen Getters Project - Phase II

    International Nuclear Information System (INIS)

    Mroz, G.

    1999-01-01

    Hydrogen levels in many transuranic (TRU) waste drums are above the compliance threshold, therefore deeming the drums non-shippable to the Waste Isolation Pilot Plant (WIPP). Hydrogen getters (alkynes and dialkynes) are known to react irreversibly with hydrogen in the presence of certain catalysts. The primary purpose of this investigation is to ascertain the effectiveness of a hydrogen getter in an environment that contains gaseous compounds commonly found in the headspace of drums containing TRU waste. It is not known whether the volatile organic compounds (VOCs) commonly found in the headspace of TRU waste drums will inhibit (''poison'') the effectiveness of the hydrogen getter. The result of this study will be used to assess the feasibility of a hydrogen-getter system, which is capable of removing hydrogen from the payload containers or the Transuranic Package Transporter-II (TRUPACT-II) inner containment vessel to increase the quantity of TRU waste that can be shipped to the WIPP. Phase II for the Hydrogen Getters Project will focus on four primary objectives: Conduct measurements of the relative permeability of hydrogen and chlorinated VOCs through Tedlar (and possibly other candidate packaging materials) Test alternative getter systems as alternatives to semi-permeable packaging materials. Candidates include DEB/Pd/Al2O3 and DEB/Cu-Pd/C. Develop, test, and deploy kinetic optimization model Perform drum-scale test experiments to demonstrate getter effectiveness

  7. SmartPark Technology Demonstration Project, Phase II: Final Report

    Science.gov (United States)

    2018-05-01

    The purpose of FMCSA's SmartPark project was to determine the feasibility of a technology for providing truck parking space availability information in real time to truckers on the road. SmartPark consisted of two phases. Phase I was a field operatio...

  8. Functional design criteria for project W-252, phase II liquid effluent treatment and disposal. Revision 2

    International Nuclear Information System (INIS)

    Hatch, C.E.

    1995-05-01

    This document is the Functional Design Criteria for Project W-252. Project W-252 provides the scope to provide BAT/AKART (best available technology...) to 200 Liquid Effluent Phase II streams (B-Plant). This revision (Rev. 2) incorporates a major descoping of the project. The descoping was done to reflect a combination of budget cutting measures allowed by a less stringent regulatory posture toward the Phase II streams

  9. FALSIRE Phase II. CSNI project for Fracture Analyses of Large-Scale International Reference Experiments (Phase II). Comparison report

    International Nuclear Information System (INIS)

    Sievers, J.; Schulz, H.; Bass, R.; Pugh, C.; Keeney, J.

    1996-11-01

    A summary of Phase II of the Project for Fracture Analysis of Large-Scale International Reference Experiments (FALSIRE) is presented. A FALSIRE II Workshop focused on analyses of reference fracture experiments. More than 30 participants representing 22 organizations from 12 countries took part in the workshop. Final results for 45 analyses of the reference experiments were received from the participating analysts. For each experiment, analysis results provided estimates of variables that include temperature, crack-mouth-opening displacement, stress, strain, and applied K and J values. The data were sent electronically to the Organizing Committee, who assembled the results into a comparative data base using a special-purpose computer program. A comparative assessment and discussion of the analysis results are presented in the report. Generally, structural responses of the test specimens were predicted with tolerable scatter bands. (orig./DG)

  10. Project NOAH: Regulating modern sea-level rise. Phase II: Jerusalem Underground

    Science.gov (United States)

    Newman, Walter S.; Fairbridge, Rhodes W.

    This proposal builds a high-speed inter-urban express between Jerusalem and Tel Aviv, generates 1500 megawatts of hydroelectric energy, curtails littoral erosion, builds a port along the Israeli Mediterranean coast and demands peaceful cooperation on both sides of the Jordan River. Phase II represents a pilot project demonstrating the feasibility of continuing to regulate world sea-level by a new series of water regulation schemes. Phase I previously described all those projects already completed or underway which have inadvertently and/or unintentionally served the purpose of sea-level regulation. These forms of Phase I sea-level regulation include large and small reservoirs, irrigation projects, water infiltration schemes, farm ponds, and swimming and reflecting pools. All these water storage projects have already exercised a very appreciable brake on 20th century sea-level rise. Phase II outlines a high-visibility proposal which will serve to illustrate the viability of “Project NOAH”.

  11. Final report on the maintenance asset management project : phase II.

    Science.gov (United States)

    2013-07-01

    Iowa Department of Transportation (IA DOT) is finalizing research to streamline field inventory/inspection of culverts by Maintenance and Construction staff while maximizing the use of tablet technologies. The project began in 2011 to develop some ne...

  12. Horonobe Underground Research Laboratory project. Synthesis of phase II (construction phase) investigations to a depth of 350 m

    International Nuclear Information System (INIS)

    Sato, Toshinori; Sasamoto, Hiroshi; Ishii, Eiichi; Matsuoka, Toshiyuki; Hayano, Akira; Miyakawa, Kazuya; Fujita, Tomoo; Tanai, Kenji; Nakayama, Masashi; Takeda, Masaki; Yokota, Hideharu; Aoyagi, Kazuhei; Ohno, Hirokazu; Shigeta, Naotaka; Hanamuro, Takahiro; Ito, Hiroaki

    2017-03-01

    The Horonobe Underground Research Laboratory (URL) Project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formations at Horonobe, northern Hokkaido. The project consists of two major research areas, 'Geoscientific Research' and 'R and D on Geological Disposal', and proceeds in three overlapping phases, 'Phase I: Surface-based investigation', 'Phase II: Construction' and 'Phase III: Operation', over a period of 20 years. This report summarizes the results of the Phase II investigations carried out from April 2005 to June 2014 to a depth of 350 m. Integration of work from different disciplines into a 'geosynthesis' ensures that the Phase II goals have been successfully achieved and identifies key issues that need to be addressed in the Phase II investigations. Efforts are made to summarize as many lessons learnt from the Phase II investigations and other technical achievements as possible to form a 'knowledge base' that will reinforce the technical basis for both implementation and the formulation of safety regulations. (author)

  13. Cyprus natural analogue project (CNAP). Phase II Final Report

    International Nuclear Information System (INIS)

    Alexander, W.R.; Milodowski, A.E.

    2011-02-01

    Due to the extremely slow kinetics of bentonite reaction in low alkali cement leachates, natural analogues would appear to be the only viable method of studying bentonite reaction. As a result of a review of the available literature, several sites in Cyprus were selected as particularly promising for this purpose. This report presents the results of two short field campaigns in Cyprus in November/December, 2008 and February, 2009. The main aim of these campaigns was to establish if appropriate sites existed for a natural analogue study of bentonite-low alkali cement leachate reaction. Focus is on mineralogical changes and not changes in physical properties (such as porosity and permeability) of bentonite as the industrially-processed bentonite used in a repository will be completely different in terms of its engineering and hydrogeological properties to the unprocessed natural bentonite or analogue smectite-rich materials. The first campaign was in the form of a reconnaissance study to identify sites of likely interest and the second, follow-up, campaign focussed on obtaining preliminary groundwater and solid phase (bentonites/clay-rich sediments/altered igneous rocks/soils) samples which would allow a more detailed assessment of several of the potential sites. A large amount of information was collected during these short field campaigns and subsequent laboratory analysis of the collected samples so, to keep the main report down to a digestible size, much of the supporting information has been collated in seven appendices. These include full details of all 30 sites visited during both campaigns along with sample details, information on the analytical techniques, the analytical raw data and numerous photographs of the sites. The intention is that this report will provide full supporting information for a potential Phase III and a detailed database for our colleagues at the Geological Survey Department (GSD) in Cyprus. Consequently, all the information acquired

  14. Project inspection using mobile technology - phase II : assessing the impacts of mobile technology on project inspection.

    Science.gov (United States)

    2015-01-01

    As mobile technology becomes widely available and affordable, transportation agencies can use this : technology to streamline operations involved within project inspection. This research, conducted in two : phases, identified opportunities for proces...

  15. 76 FR 55947 - Industrial Relations Promotion Project, Phase II in Vietnam

    Science.gov (United States)

    2011-09-09

    ... DEPARTMENT OF LABOR Office of the Secretary Industrial Relations Promotion Project, Phase II in... to perform the type of activity to be funded.. DAI, through its Industrial Relations Promotion... provided a letter in support of continued funding of DAI/IRRP based, on part, on the importance of the...

  16. Aerospace Systems Monitor, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Proposal Title: Aerospace Systems Monitor PHASE 1 Technical Abstract: This Phase II STTR project will continue development and commercialization of the Aerospace...

  17. Characterization of unpaved road condition through the use of remote sensing project - phase II, deliverable 8-D: final report.

    Science.gov (United States)

    2016-03-07

    Building on the success of developing a UAV based unpaved road assessment system in Phase I, the project team was awarded a Phase II project by the USDOT to focus on outreach and implementation. The project team added Valerie Lefler of Integrated Glo...

  18. Phase II Water Rental Pilot Project: Snake River Resident Fish and Wildlife Resources and Management Recommendations.

    Energy Technology Data Exchange (ETDEWEB)

    Stovall, Stacey H.

    1994-08-01

    The Idaho Water Rental Pilot Project was implemented in 1991 as part of the Non-Treaty Storage Fish and Wildlife Agreement between Bonneville Power Administration and the Columbia Basin Fish and Wildlife Authority. The goal of the project is to quantify resident fish and wildlife impacts resulting from salmon flow augmentation releases made from the upper Snake River Basin. Phase I summarized existing resource information and provided management recommendations to protect and enhance resident fish and wildlife habitat resulting from storage releases for the I improvement of an adromous fish migration. Phase II includes the following: (1) a summary of recent biological, legal, and political developments within the basin as they relate to water management issues, (2) a biological appraisal of the Snake River between American Falls Reservoir and the city of Blackfoot to examine the effects of flow fluctuation on fish and wildlife habitat, and (3) a preliminary accounting of 1993--1994 flow augmentation releases out of the upper Snake, Boise, and Payette river systems. Phase III will include the development of a model in which annual flow requests and resident fish and wildlife suitability information are interfaced with habitat time series analysis to provide an estimate of resident fish and wildlife resources.

  19. OC5 Project Phase II: Validation of Global Loads of the DeepCwind Floating Semisubmersible Wind Turbine

    DEFF Research Database (Denmark)

    Robertson, Amy N.; Wendt, Fabian; Jonkman, Jason M.

    2017-01-01

    This paper summarizes the findings from Phase II of the Offshore Code Comparison, Collaboration, Continued, with Correlation project. The project is run under the International Energy Agency Wind Research Task 30, and is focused on validating the tools used for modeling offshore wind systems thro...

  20. Materials information for science and technology (MIST): Project overview: Phases I and II and general considerations

    Energy Technology Data Exchange (ETDEWEB)

    Grattidge, W.; Westbrook, J.; McCarthy, J.; Northrup, C. Jr.; Rumble, J. Jr.

    1986-01-01

    This report documents the initial phases of the Materials Information for Science and Technology (MIST) project jointly supported by the Department of Energy and the National Bureau of Standards. The purpose of MIST is to demonstrate the power and utility of computer access to materials property data. The initial goals include: to exercise the concept of a computer network of materials databases and to build a demonstration of such a system suitable for use as the core of operational systems in the future. Phases I and II are described in detail herein. In addition, a discussion is given of the expected usage of the system. The primary MIST prototype project is running on an IBM 3084 under STS at the Stanford University's Information Technology Services (ITS). Users can access the Stanford system via ARPANET, TELENET, and TYMNET, as well as via commercial telephone lines. For fastest response time and use of the full screen PRISM interface, direct connection using a 2400 baud modem with the MNP error-correcting protocol over standard telephone lines gives the best results - though slower speed connections and a line-oriented interface are also available. This report gives detailed plans regarding the properties to be enterend and the materials to be entered into the system.

  1. Phase II Final Project Report SBIR Project: "A High Efficiency PV to Hydrogen Energy System"

    Energy Technology Data Exchange (ETDEWEB)

    Slade, A; Turner, J; Stone, K; McConnell, R

    2008-09-02

    The innovative research conducted for this project contributed greatly to the understanding of generating low-cost hydrogen from solar energy. The project’s research identified two highly leveraging and complementary pathways. The first pathway is to dramatically increase the efficiency of converting sunlight into electricity. Improving solar electric conversion efficiency directly increases hydrogen production. This project produced a world record efficiency for silicon solar cells and contributed to another world record efficiency for a solar concentrator module using multijunction solar cells. The project’s literature review identified a second pathway in which wasted heat from the solar concentration process augments the electrolysis process generating hydrogen. One way to do this is to use a “heat mirror” that reflects the heat-producing infrared and transmits the visible spectrum to the solar cells; this also increases solar cell conversion efficiency. An economic analysis of this concept confirms that, if long-term concentrator photovoltaic (CPV) and solid-oxide electrolyzer cost goals can be achieved, hydrogen will be produced from solar energy cheaper than the cost of gasoline. The potential public benefits from this project are significant. The project has identified a potential energy source for the nation’s future electricity and transportation needs that is entirely “home grown” and carbon free. As CPV enter the nation’s utility markets, the opportunity for this approach to be successful is greatly increased. Amonix strongly recommends further exploration of this project’s findings.

  2. Individualized In-Service Teacher Education. (Project IN-STEP). Evaluation Report, Phase II.

    Science.gov (United States)

    Thurber, John C.

    Phase 2 of Project IN-STEP was conducted to revise, refine, and conduct further field testing of a new inservice teacher education model. The method developed (in Phase 1--see ED 003 905 for report) is an individualized, multi-media approach. Revision activities, based on feedback provided for Phase 1, include the remaking of six videotape…

  3. Horonobe Underground Research Laboratory project. Plans of investigations during shaft and drift excavation (Construction of underground facilities: Phase II)

    International Nuclear Information System (INIS)

    2005-06-01

    Horonobe Underground Research Laboratory Project is planned for over 20 years to establish the scientific and technical basis for the underground disposal of high-level radioactive wastes in Japan. The investigations are conducted by JNC in three phases, from the surface (Phase I), during the construction of the underground facilities (Phase II), and using the facilities (Phase III). This report concerns the investigation plans for Phase II. During excavation of shafts and drifts, detailed geological and borehole investigation will be conducted and the geological model constructed in Phase I is evaluated and revised by newly acquired data of geophysical and geological environment. Detailed in-situ experiments, as well as the effects of shaft excavation, are also done to study long-term changes, rock properties, groundwater flow and chemistry to ensure the reliability of repository technology and establish safety assessment methodology. (S. Ohno)

  4. Self-reliance and innovation of Qinshan phase II NPP project

    International Nuclear Information System (INIS)

    Ye Qizhen; Yang Lanhe

    2007-01-01

    This article mainly describes the self-reliance and innovation of Qinshan nuclear power project of phase II, in-between it contains new reactor core design, as well as related experimental and calculation analysis, especially for new reactor design produced fluid-induced vibration model test, theoretical analysis and testing in-built reactor; aiming at two-loop NSSS a series improvement made for safety systems and related safety analysis to enhance their reliability and redundancy; according to specialty of two-loop NSSS an optimization made for NPP parameters and design of related equipments, for the purpose to make the output of NPP maximal; design of main reactor building and T-G building also improved according to characteristics of two-loop NSSS and site conditions. CRDM and refueling machine are researched and manufactured on base of self-reliance, their performance are better than design requirements, large portion of key equipments are localized through different way. In construction first time realized the integrated erection of containment dome. During the commissioning non-nuclear steam driving of T-G set, as well as 500 kV high voltage rising using emergent diesel generator, etc. are carried out.In period of operation still continuous innovation and improvement are made, so that to keep the good record of operation. (authors)

  5. Technical realisation of the VISA-II Project, Phase II, Chapter X, Vol. VI; Tehnicka realizacija projekta VISA-II, II faza, Glava X, Album VI

    Energy Technology Data Exchange (ETDEWEB)

    Pavicevic, M; Nikolic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1963-01-15

    The second phase of the 'Project VISA-2 described in this chapter of Vol. VI includes the project specifications and technical drawings of the 'measuring system of VISA-2 for testing the VISA-2 channels outside and in the reactor'. In addition to the task objective, description of the measuring system, action plan, description of the work done it contains the definition of the task 'Leak testing' and instructions for the instrumentation personnel on duty. [Serbo-Croat] Druga faza zadatka {sup T}ehnicka realizacija projekta VISA-2' opisana u ovom poglavlju Albuma VI, sadrzi tehnicki opis i crteze 'Mernog sistema VISA-2 i ispitivanje kanala VISA-2 van reaktora i u reaktoru'. Pored definicije zadatka, opisa mernog sistema VISA-2, razrade zadatka, tekstualnog dela projekta i opisa izvedenih radova, ovo poglavlje obuhvata definiciju i razradu podzadatka 'Ispitivanje hermeticnosti' i dodatak sa instrukcijama za dezurne instrumentatore u vezi eksperimenta VISA-2.

  6. Phase II Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Schuknecht, Nate [Project Manager; White, David [Principle Investigator; Hoste, Graeme [Research Engineer

    2014-09-11

    The SkyTrough DSP will advance the state-of-the-art in parabolic troughs for utility applications, with a larger aperture, higher operating temperature, and lower cost. The goal of this project was to develop a parabolic trough collector that enables solar electricity generation in the 2020 marketplace for a 216MWe nameplate baseload power plant. This plant requires an LCOE of 9¢/kWhe, given a capacity factor of 75%, a fossil fuel limit of 15%, a fossil fuel cost of $6.75/MMBtu, $25.00/kWht thermal storage cost, and a domestic installation corresponding to Daggett, CA. The result of our optimization was a trough design of larger aperture and operating temperature than has been fielded in large, utility scale parabolic trough applications: 7.6m width x 150m SCA length (1,118m2 aperture), with four 90mm diameter × 4.7m receivers per mirror module and an operating temperature of 500°C. The results from physical modeling in the System Advisory Model indicate that, for a capacity factor of 75%: The LCOE will be 8.87¢/kWhe. SkyFuel examined the design of almost every parabolic trough component from a perspective of load and performance at aperture areas from 500 to 2,900m2. Aperture-dependent design was combined with fixed quotations for similar parts from the commercialized SkyTrough product, and established an installed cost of $130/m2 in 2020. This project was conducted in two phases. Phase I was a preliminary design, culminating in an optimum trough size and further improvement of an advanced polymeric reflective material. This phase was completed in October of 2011. Phase II has been the detailed engineering design and component testing, which culminated in the fabrication and testing of a single mirror module. Phase II is complete, and this document presents a summary of the comprehensive work.

  7. Advanced conceptual design report. Phase II. Liquid effluent treatment and disposal Project W-252

    International Nuclear Information System (INIS)

    1995-01-01

    This Advanced Conceptual Design Report (ACDR) provides a documented review and analysis of the Conceptual Design Report (CDR), WHC-SD-W252-CDR-001, June 30, 1993. The ACDR provides further design evaluation of the major design approaches and uncertainties identified in the original CDR. The ACDR will provide a firmer basis for the both the design approach and the associated planning for the performance of the Definitive Design phase of the project

  8. Scientists help the children of Chernobyl. The GAST/VDEW project. Report on phase II: 1. April 1996 - 31. March 1998

    International Nuclear Information System (INIS)

    Reiners, Ch.; Biko, J.; Streffer, C.

    2000-05-01

    In this project phase II, from 1. April 1996 until 31. March 1998, the activities under the four partial projects entitled 'Therapy and training', 'Biological dosimetry', 'Dosimetry and risk assessment', and 'Coordination and examination authority at Minsk' have been continued and concluded, except for the partial project 'Therapy and training'. (orig./CB) [de

  9. The AquaDEB project: Physiological flexibility of aquatic animals analysed with a generic dynamic energy budget model (phase II)

    Science.gov (United States)

    Alunno-Bruscia, Marianne; van der Veer, Henk W.; Kooijman, Sebastiaan A. L. M.

    2011-11-01

    This second special issue of the Journal of Sea Research on development and applications of Dynamic Energy Budget (DEB) theory concludes the European Research Project AquaDEB (2007-2011). In this introductory paper we summarise the progress made during the running time of this 5 years' project, present context for the papers in this volume and discuss future directions. The main scientific objectives in AquaDEB were (i) to study and compare the sensitivity of aquatic species (mainly molluscs and fish) to environmental variability within the context of DEB theory for metabolic organisation, and (ii) to evaluate the inter-relationships between different biological levels (individual, population, ecosystem) and temporal scales (life cycle, population dynamics, evolution). AquaDEB phase I focussed on quantifying bio-energetic processes of various aquatic species ( e.g. molluscs, fish, crustaceans, algae) and phase II on: (i) comparing of energetic and physiological strategies among species through the DEB parameter values and identifying the factors responsible for any differences in bioenergetics and physiology; (ii) considering different scenarios of environmental disruption (excess of nutrients, diffuse or massive pollution, exploitation by man, climate change) to forecast effects on growth, reproduction and survival of key species; (iii) scaling up the models for a few species from the individual level up to the level of evolutionary processes. Apart from the three special issues in the Journal of Sea Research — including the DEBIB collaboration (see vol. 65 issue 2), a theme issue on DEB theory appeared in the Philosophical Transactions of the Royal Society B (vol 365, 2010); a large number of publications were produced; the third edition of the DEB book appeared (2010); open-source software was substantially expanded (over 1000 functions); a large open-source systematic collection of ecophysiological data and DEB parameters has been set up; and a series of DEB

  10. Qinshan phase II extension nuclear power project thermal stratification and fatigue stress analysis for pressurizer surge line

    International Nuclear Information System (INIS)

    Yu Xiaofei; Zhang Yixiong; Ai Honglei

    2010-01-01

    Thermal stratification of pressurizer surge line induced by the inside fluid brings on global bending moments, local thermal stresses, unexpected displacements and support loadings of the pipe system. In order to avoid a costly three-dimensional computation, a combined 1D/2D technique has been developed and implemented to analyze the thermal stratification and fatigue stress of pressurize surge line of QINSHAN Phase II Extension Nuclear Power Project in this paper, using the computer codes SYSTUS and ROCOCO. According to the mechanical analysis results of stratification, the maximum stress and cumulative usage factor, the loadings at connections of surge line to main pipe and RCP and the displacements of surge line at supports are obtained. (authors)

  11. Technical realisation of the VISA-II project, phase I, part IV, IZ-165-o268-1962

    International Nuclear Information System (INIS)

    Pavicevic, M.

    1962-12-01

    Project VISA-II is described in IX chapters as follows: introduction, definition of experiments and possibilities of performance; VISA-II channel, new experimental space in the RA reactor; hydraulic tests in the VISA-II channel; measurement of fast neutron and gamma flux in VISA-II channels; measurement of water flow through different VISA-2 irradiation capsules; fabrication of VISA-II capsules; corrosion and heavy water purity problems; safety problems of experiment VISA-2; experimental operation of VISA-II. This chapter VI includes documentation for each type of capsule, review about each experiment within the VISA-II project, the objective and purpose of the experiment as well as experimental device [sr

  12. High temperature gasification and gas cleaning – phase II of the HotVegas project

    OpenAIRE

    Meysel, P.; Halama, S.; Botteghi, F.; Steibel, M.; Nakonz, M.; Rück, R.; Kurowski, P.; Buttler, A.; Spliethoff, H.

    2016-01-01

    The primary objective of the research project HotVeGas is to lay the necessary foundations for the long-term development of future, highly efficient high-temperature gasification processes. This includes integrated hot gas cleaning and optional CO2 capture and storage for next generation IGCC power plants and processes for the development of synthetic fuels. The joint research project is funded by the German Federal Ministry of Economics and Technology and five industry partners. It is coordi...

  13. Vocational Assessment of Special Needs Individuals Project: Final Report. Phase II.

    Science.gov (United States)

    Stodden, Robert A.

    The Vocational Assessment of Special Needs Individuals Project originated with the regional vocational schools and educational collaboratives of the Assabet and Blackstone Valleys cooperating to determine a meaningful process through which vocational assessment information could be collected, organized, and used in formulating a basis for…

  14. Indianapolis Manpower Utilization Project of Flanner House. Phase II (February 1, 1968-April 30, 1968).

    Science.gov (United States)

    Flanner House, Inc., Indianapolis, IN.

    A private agency, Flanner House of Indianapolis, combined efforts with the Federal government, the Indiana State Employment Service, and private industry to provide upward job mobility for undereducated individuals who are either unemployed or underemployed. The project was designed to show that: (1) Private industry is willing to finance an…

  15. Caltrans WeatherShare Phase II System: An Application of Systems and Software Engineering Process to Project Development

    Science.gov (United States)

    2009-08-25

    In cooperation with the California Department of Transportation, Montana State University's Western Transportation Institute has developed the WeatherShare Phase II system by applying Systems Engineering and Software Engineering processes. The system...

  16. {open_quotes}O{close_quotes} ring sealed process tube, Phase II, test project

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R.E.

    1951-04-09

    The {open_quotes}O{close_quotes} ring seal has been proposed to replace the van stone flange and the bellows thermal expansion assembly currently used on the existing Hanford piles to achieve water and gas seals, respectively. Possible advantages of the {open_quotes}O{close_quotes} ring seal are: (1) simplification of component parts and elimination of van stone corrosion; (2) simplification of maintenance; (3) lower costs of initial erection; (4) increased strength. This test supplements Test Project No. 27 (a preliminary thermal cycling test) in applying the {open_quotes}O{close_quotes} ring seal assembly to actual pile operating conditions.

  17. River Protection Project Integrated safety management system phase II verification review plan - 7/29/99

    International Nuclear Information System (INIS)

    SHOOP, D.S.

    1999-01-01

    The purpose of this review is to verify the implementation status of the Integrated Safety Management System (ISMS) for the River Protection Project (RPP) facilities managed by Fluor Daniel Hanford, Inc. (FDH) and operated by Lockheed Martin Hanford Company (LMHC). This review will also ascertain whether within RPP facilities and operations the work planning and execution processes are in place and functioning to effectively protect the health and safety of the workers, public, environment, and federal property over the RPP life cycle. The RPP ISMS should support the Hanford Strategic Plan (DOERL-96-92) to safely clean up and manage the site's legacy waste and deploy science and technology while incorporating the ISMS central theme to ''Do work safely'' and protect human health and the environment

  18. Project 1946: Phase II

    Science.gov (United States)

    2010-07-01

    we did not yet have them in the squa- drons . In the Sukhoi, the pilot flies the aircraft; in the Mirage, it is the other way around. The pilot has...correct. Bandar-e Abbas Airport in Iran was far away. The 36th Squa- dron was supposed to fly Tu-22s out of Oman, but the runway there was too short...that entered service in the late 1970s. 204 dron was based.28 The Stark was in the wrong place at the wrong time. We defined an ex- clusion zone

  19. Phase II clinical development of new drugs

    CERN Document Server

    Ting, Naitee; Ho, Shuyen; Cappelleri, Joseph C

    2017-01-01

    This book focuses on how to appropriately plan and develop a Phase II program, and how to design Phase II clinical trials and analyze their data. It provides a comprehensive overview of the entire drug development process and highlights key questions that need to be addressed for the successful execution of Phase II, so as to increase its success in Phase III and for drug approval. Lastly it warns project team members of the common potential pitfalls and offers tips on how to avoid them.

  20. TP Atlas: integration and dissemination of advances in Targeted Proteins Research Program (TPRP)-structural biology project phase II in Japan.

    Science.gov (United States)

    Iwayanagi, Takao; Miyamoto, Sei; Konno, Takeshi; Mizutani, Hisashi; Hirai, Tomohiro; Shigemoto, Yasumasa; Gojobori, Takashi; Sugawara, Hideaki

    2012-09-01

    The Targeted Proteins Research Program (TPRP) promoted by the Ministry of Education, Culture, Sports, Science and Technology (MEXT) of Japan is the phase II of structural biology project (2007-2011) following the Protein 3000 Project (2002-2006) in Japan. While the phase I Protein 3000 Project put partial emphasis on the construction and maintenance of pipelines for structural analyses, the TPRP is dedicated to revealing the structures and functions of the targeted proteins that have great importance in both basic research and industrial applications. To pursue this objective, 35 Targeted Proteins (TP) Projects selected in the three areas of fundamental biology, medicine and pharmacology, and food and environment are tightly collaborated with 10 Advanced Technology (AT) Projects in the four fields of protein production, structural analyses, chemical library and screening, and information platform. Here, the outlines and achievements of the 35 TP Projects are summarized in the system named TP Atlas. Progress in the diversified areas is described in the modules of Graphical Summary, General Summary, Tabular Summary, and Structure Gallery of the TP Atlas in the standard and unified format. Advances in TP Projects owing to novel technologies stemmed from AT Projects and collaborative research among TP Projects are illustrated as a hallmark of the Program. The TP Atlas can be accessed at http://net.genes.nig.ac.jp/tpatlas/index_e.html .

  1. Options Study - Phase II

    Energy Technology Data Exchange (ETDEWEB)

    R. Wigeland; T. Taiwo; M. Todosow; W. Halsey; J. Gehin

    2010-09-01

    The Options Study has been conducted for the purpose of evaluating the potential of alternative integrated nuclear fuel cycle options to favorably address the issues associated with a continuing or expanding use of nuclear power in the United States. The study produced information that can be used to inform decisions identifying potential directions for research and development on such fuel cycle options. An integrated nuclear fuel cycle option is defined in this study as including all aspects of the entire nuclear fuel cycle, from obtaining natural resources for fuel to the ultimate disposal of used nuclear fuel (UNF) or radioactive wastes. Issues such as nuclear waste management, especially the increasing inventory of used nuclear fuel, the current uncertainty about used fuel disposal, and the risk of nuclear weapons proliferation have contributed to the reluctance to expand the use of nuclear power, even though it is recognized that nuclear power is a safe and reliable method of producing electricity. In this Options Study, current, evolutionary, and revolutionary nuclear energy options were all considered, including the use of uranium and thorium, and both once-through and recycle approaches. Available information has been collected and reviewed in order to evaluate the ability of an option to clearly address the challenges associated with the current implementation and potential expansion of commercial nuclear power in the United States. This Options Study is a comprehensive consideration and review of fuel cycle and technology options, including those for disposal, and is not constrained by any limitations that may be imposed by economics, technical maturity, past policy, or speculated future conditions. This Phase II report is intended to be used in conjunction with the Phase I report, and much information in that report is not repeated here, although some information has been updated to reflect recent developments. The focus in this Options Study was to

  2. Ultraflat Tip-Tilt-Piston MEMS Deformable Mirror, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — This proposal describes a Phase II SBIR project to develop high-resolution, ultraflat micromirror array devices using advanced silicon surface micromachining...

  3. Post Process Characterization of Friction Stir Welded Components, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Luna Innovations Incorporated proposes in this STTR Phase II project to continue development and validation of Luna's amplitude-dependent, nonlinear ultrasonic...

  4. TJ-II project

    International Nuclear Information System (INIS)

    Alejaldre, C.; Gozalo, J.J.A.; Perez, J.B.; Magaria, F.C.; Diaz, J.R.C.; Perez, J.G.; Lopez-Fraguas, A.; Garcia, L.; Krivenski, V.I.; Martin, R.; Navarro, A.P.; Perea, A.; Rodriguez-Yunta, A.; Ayza, M.S.; Varias, A.

    1990-01-01

    The TJ-II device is a medium-size helical-axis stellarator to be built in Madrid. Its main characteristics are potential for high-beta operation; flexibility, i.e., its rotational transform can be varied over a wide range and its shear to some extent; and bean-shaped plasma cross section. The latest understanding of TJ-II physics in the fields of electron cyclotron resonance heating, transport, and magneto-hydrodynamics, and the engineering solutions introduced in its final design are discussed

  5. Lunar Health Monitor, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — During the Phase II Lunar Health Monitor program, Orbital Research will develop a second generation wearable sensor suite for astronaut physiologic monitoring. The...

  6. Final project report: TA-35 Los Alamos Power Reactor Experiment No. II (LAPRE II) decommissioning project

    International Nuclear Information System (INIS)

    Montoya, G.M.

    1993-02-01

    This final report addresses the decommissioning of the LAPRE II Reactor, safety enclosure, fuel reservoir tanks, emergency fuel recovery system, primary pump pit, secondary loop, associated piping, and the post-remediation activities. Post-remedial action measurements are also included. The cost of the project including, Phase I assessment and Phase II remediation was approximately $496K. The decommissioning operation produced 533 M 3 of mixed waste

  7. Final project report, TA-35 Los Alamos Power Reactor Experiment No. II (LAPRE II) decommissioning project

    International Nuclear Information System (INIS)

    Montoya, G.M.

    1992-01-01

    This final report addresses the decommissioning of the LAPRE II Reactor, safety enclosure, fuel reservoir tanks, emergency fuel recovery system, primary pump pit, secondary loop, associated piping, and the post-remediation activities. Post-remedial action measurements are also included. The cost of the project, including Phase I assessment and Phase II remediation was approximately $496K. The decommissioning operation produced 533 m 3 of low-level solid radioactive waste and 5 m 3 of mixed waste

  8. Hovdabrekka Project II

    DEFF Research Database (Denmark)

    Hovden, Jan

    2008-01-01

    The Hovdabrekka group is a group of nordic researchers doing survey studies of Nordic journalism schools (2005,2008). This site is dedicated to information from this project. The current members are: Norway: Rune Ottosen,Gunn Bjørnsen and Jan Fredrik Hovden Sweden: Jenny Wiik Denmark: Ida Willig...... and Jannie Møller Hartley. Finland: Henrika Zilliacus-Tikkanen and Raimo Solokangas Former members: Jan Dyberg and Hanne Jørndrup (Denmark), Marina Ghersetti (Sweden) Project Hovdabrekka originated at the Nordic conference for journalist teachers at Hovdabrekka, Iceland September 2004, where a small group...... of scientists/lecturers assembled with a desire to do a comparative quantitative study of students at Nordic journalism schools. Until very recently, there existed little systematic knowledge on the students of journalism in the Nordic countries. For these reasons, the Hovdabrekka group planned and sent out...

  9. Improved cytometry - Phase II

    International Nuclear Information System (INIS)

    McLean, J.R.N.

    1995-09-01

    One shortcoming of biological dosimetry based on the detection and quantitation of chromosome aberrations, is the labor intensive nature of the analysis. State-of-the-art imaging software cannot recognize the wide variety of shapes that can be assumed by dicentric chromosomes nor the algorithms available to accommodate translocation analysis. In this project, relatively simple computer routines have been used to reduce the time necessary to perform the repetitive tasks associated with radiation dosimetry. Repetitive tasks that can be computerized include data reduction and collation, verification of the number of chromosomes in each metaphase spread and, with the help of a motorized microscope stage and computer-assisted focus control, the automated location of metaphase chromosome spreads. The task of automated metaphase location is addressed in this project. The tasks of data reduction and computer-assisted chromosome counting have been addressed in a previous report to the Atomic Energy Control Board (AECB) research project no.7.164.1. The preliminary evaluation of the performance of the metaphase finder, indicates a false positive rate of less than or equal to 7% and a false negative rate of less than or equal to 23%, using a limited data set of 1289 events and threshold values at 25, 26, 27, or 28. Over the 4 threshold levels, the average system sensitivity was calculated to be 75% and positive predictability to be 85%. Sensitivity is the fraction of real events which are correctly detected, and positive predictability, the fraction of detections which are real events. In a perfect detector, these values would be 100%. (author). 5 refs., 1 tab

  10. The AquaDEB project: Physiological flexibility of aquatic animals analysed with a generic dynamic energy budget model (phase II).

    NARCIS (Netherlands)

    Alunno-Bruscia, M.; v.d. Veer, H.; Kooijman, S.A.L.M.

    2011-01-01

    This second special issue of the Journal of Sea Research on development and applications of Dynamic Energy Budget (DEB) theory concludes the European Research Project AquaDEB (2007-2011). In this introductory paper we summarise the progress made during the running time of this 5. years' project,

  11. Solent Disturbance and Mitigation Project Phase II: Predicting the impact of human disturbance on overwintering birds in the Solent.

    OpenAIRE

    Stillman, Richard A.; West, Andrew D.; Clarke, Ralph T.; Liley, D.

    2012-01-01

    The Solent coastline provides feeding grounds for internationally protected populations of overwintering waders and wildfowl, and is also extensively used for recreation. In response to concerns over the impact of recreational pressure on birds within protected areas in the Solent, the Solent Forum initiated the Solent Disturbance and Mitigation Project to determine visitor access patterns around the coast and how their activities may influence the birds. The project has been divided into two...

  12. The AquaDEB project: Physiological flexibility of aquatic animals analysed with a generic dynamic energy budget model (phase II)

    OpenAIRE

    Alunno-bruscia, Marianne; Van Der Veer, Henk; Kooijman, S. A. L. M.

    2011-01-01

    This second special issue of the Journal of Sea Research on development and applications of Dynamic Energy Budget (DEB) theory concludes the European Research Project AquaDEB (2007–2011). In this introductory paper we summarise the progress made during the running time of this 5 years’ project, present context for the papers in this volume and discuss future directions. The main scientific objectives in AquaDEB were (i) to study and compare the sensitivity of aquatic species (mainly molluscs ...

  13. Status of Gerda Phase II

    Energy Technology Data Exchange (ETDEWEB)

    Wagner, Victoria [Max-Planck-Institut fuer Kernphysik, Heidelberg (Germany); Collaboration: GERDA-Collaboration

    2016-07-01

    The GERDA experiment is designed to search for neutrinoless double beta (0νββ) decay of {sup 76}Ge. In Phase I of the experiment a background index (BI) of 10{sup -2} cts/(keV.kg.yr) was reached. No signal has been found and a lower limit on the half-life of 2.1.10{sup 25} yr (at 90% C.L.) is extracted. The aim of Phase II is to double the Ge mass and further reduce the BI by an order of magnitude to explore half-lives of about 10{sup 26} yr. Thirty new Broad Energy Germanium (BEGe) detectors have been produced. These detectors are distinct for their improved energy resolution and enhanced pulse shape discrimination of signal from background events. Further background reduction will be reached by an active veto to read out argon scintillation light. The Phase II commissioning showed that two of the major background components, external γ-rays from {sup 214}Bi and {sup 208}Tl decays, can be suppressed up to two orders of magnitude. This talk presents the current status of the GERDA Phase II upgrade.

  14. Nano-Phase Powder Based Exothermic Braze Repair Technology For RCC Materials, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The Phase II project will advance innovative, cost effective and reliable nano-phase exothermic RCC joining processes (ExoBrazeTM) in order to be able to reinforce...

  15. Assessment of the feasibility of studying the potential health effects of the West Valley Solidification Project. Phase II

    International Nuclear Information System (INIS)

    Matanoski, G.M.

    The activities at West Valley involve potential exposure to ionizing radiation. The health effects from radiation are well known and the projected levels of exposure in this situation are so low as to pose no known health hazard in the community. In such a situation it is not reasonable to propose an expensive, comprehensive and physically invasive screening program for the public unless one could justify the benefits. This report describes a feasible population-based surveillance or disease monitoring system which could be implemented in the West Valley area in order to assess the relevance of any changes in incidence of disease which might be attributable to radiation. The proposed plan is both practical and inexpensive. It would anticipate any potential changes in the health status of the population and provide a means to objectively interpret such changes before major concerns develop

  16. U10 : Trusted Truck(R) II (phase B).

    Science.gov (United States)

    2009-01-01

    Phase B of the Trusted Truck II project built on the system developed in Phase A (or Year 1). For the implementation portion of the project, systems were added to the trailer to provide additional diagnostic trailer data that can be sent to the TTM...

  17. Composite Structure Monitoring using Direct Write Sensors, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — This NASA SBIR Phase II project seeks to develop and demonstrate a suite of sensor products to monitor the health of composite structures. Sensors will be made using...

  18. InGaN High Temperature Photovoltaic Cells, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The objectives of this Phase II project are to develop InGaN photovoltaic cells for high temperature and/or high radiation environments to TRL 4 and to define the...

  19. High Radiation Resistance Inverted Metamorphic Solar Cell, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The innovation in this SBIR Phase II project is the development of a unique triple junction inverted metamorphic technology (IMM), which will enable the...

  20. Multifunctional Aerogel Thermal Protection Systems for Hypersonic Vehicles, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The overall objective of the Phase II project is to develop lightweight reinforced aerogel materials for use as the core structural insulation material in...

  1. South Bay Salt Pond Tidal Wetland Restoration Phase II Planning

    Science.gov (United States)

    Information about the SFBWQP South Bay Salt Pond Tidal Wetland Restoration Phase II Planning project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic re

  2. South Bay Salt Pond Restoration, Phase II at Ravenswood

    Science.gov (United States)

    Information about the South Bay Salt Pond Restoration Project: Phase II Construction at Ravenswood, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  3. Recession-Tolerant Sensors for Thermal Protection Systems, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The Phase II project will develop a suite of diagnostic sensors using Direct Write technology to measure temperature, surface recession depth, and heat flux of an...

  4. Improved Lunar and Martian Regolith Simulant Production, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The technical objective of the Phase II project is to provide a more complete investigation of the long-term needs of the simulant community based on the updated...

  5. Sample Exchange Evaluation (SEE) Report - Phase II

    International Nuclear Information System (INIS)

    Winters, W.I.

    1994-01-01

    This report describes the results from Phase II of the Sample Exchange Evaluation (SEE) Program, a joint effort to compare analytical laboratory performance on samples from the Hanford Site's high-level waste tanks. In Phase II, the program has been expanded to include inorganic constituents in addition to radionuclides. Results from Phase II that exceeded 20% relative percent difference criteria are identified

  6. Strategies for the long-term climate policy. The results of the Cool project. Final report of the second phase of the Dutch National Research Programme on Global Air Pollution and Climate Change (NRP II) 1995-2001. Part 2

    NARCIS (Netherlands)

    Berk M; Hisschemoller M; Mol T; Hordijk L; Kok M; Metz B; NOP

    2002-01-01

    This report, Climate Change, a Permanent Concern, presents the results of research that was conducted in over 90 projects during the second phase of the National Research Programme on Global Air Pollution and Climate Change (NRP-II, 1995-2001). The report is intended for policymakers, members of

  7. Planning level assessment of greenhouse gas emissions for alternative transportation construction projects : carbon footprint estimator, phase II, volume I - GASCAP model.

    Science.gov (United States)

    2014-03-01

    The GASCAP model was developed to provide a software tool for analysis of the life-cycle GHG : emissions associated with the construction and maintenance of transportation projects. This phase : of development included techniques for estimating emiss...

  8. Grid-connected integrated community energy system. Phase II, Stage 1, final report. Conceptual design, demand and fuel projections and cost analysis

    Energy Technology Data Exchange (ETDEWEB)

    1978-03-08

    The Phase I Report, Grid ICES, presented the broad alternatives and implications for development of an energy system satisfying thermal demand with the co-generation of electric power, all predicated on the use of solid fuels. Participants of the system are the University of Minnesota, operator and primary thermal user, and Northern States Power Company, primary electrical user; with St. Mary's Hospital, Fairview Hospital, and Augsburg College as Add-on Customers for the thermal service (Option I). Included for consideration are the Options of (II) solid waste disposal by the Pyrolysis Method, with heat recovery, and (III) conversion of a portion of the thermal system from steam to hot water distribution to increase co-generation capability and as a demonstration system for future expansion. This report presents the conceptual design of the energy system and each Option, with the economic implications identified so that selection of the final system can be made. Draft outline of the Environmental Assessment for the project is submitted as a separate report.

  9. Summary of Research through Phase II/Year 2 of Initially Approved 3 Phase/3 Year Project - Establishing the Relationship between Fracture-Related Dolomite and Primary Rock Fabric on the Distribution of Reservoirs in the Michigan Basin

    Energy Technology Data Exchange (ETDEWEB)

    G. Grammer

    2007-09-30

    This final scientific/technical report covers the first 2 years (Phases I and II of an originally planned 3 Year/3 Phase program). The project was focused on evaluating the relationship between fracture-related dolomite and dolomite constrained by primary rock fabric in the 3 most prolific reservoir intervals in the Michigan Basin. The characterization of select dolomite reservoirs was the major focus of our efforts in Phases I and II of the project. Structural mapping and log analysis in the Dundee (Devonian) and Trenton/Black River (Ordovician) suggest a close spatial relationship among gross dolomite distribution and regional-scale, wrench fault-related NW-SE and NE-SW structural trends. A high temperature origin for much of the dolomite in these 2 studied intervals (based upon fluid inclusion homogenization temperatures and stable isotopic analyses,) coupled with persistent association of this dolomite in reservoirs coincident with wrench fault-related features, is strong evidence for these reservoirs being influenced by hydrothermal dolomitization. In the Niagaran (Silurian), there is a general trend of increasing dolomitization shelfward, with limestone predominant in more basinward positions. A major finding is that facies types, when analyzed at a detailed level, are directly related to reservoir porosity and permeability in these dolomites which increases the predictability of reservoir quality in these units. This pattern is consistent with our original hypothesis of primary facies control on dolomitization and resulting reservoir quality at some level. The identification of distinct and predictable vertical stacking patterns within a hierarchical sequence and cycle framework provides a high degree of confidence at this point that the results should be exportable throughout the basin. Much of the data synthesis and modeling for the project was scheduled to be part of Year 3/Phase III, but the discontinuation of funding after Year 2 precluded those efforts

  10. Sample Exchange Evaluation (SEE) Report - Phase II

    Energy Technology Data Exchange (ETDEWEB)

    Winters, W.I.

    1994-09-28

    This report describes the results from Phase II of the Sample Exchange Evaluation (SEE) Program, a joint effort to compare analytical laboratory performance on samples from the Hanford Site`s high-level waste tanks. In Phase II, the program has been expanded to include inorganic constituents in addition to radionuclides. Results from Phase II that exceeded 20% relative percent difference criteria are identified.

  11. Status of the FRM-II project

    International Nuclear Information System (INIS)

    Boening, K.

    1994-01-01

    The new research reactor FRM-II at Garching near Munich is planned to become a high performance source of slow neutrons in Germany. Its design concept provides for a very compact reactor core cooled by light water and placed within a heavy water moderator tank, where a high thermal neutron flux will be obtained at only 20 MW power. - This paper begins with an overview over some of the essential design features and some more recent design modifications. It then reports on the status of the project, the most important event being a positive decision which the Bavarian State Government has made in January 1993 and which represented a green light for the project to enter the next project phase. Consequently, two official requests have been made by the Technical University of Munich, one for the nuclear licensing of the facility and the other for the so called 'Raumordnungsverfahren'. In this context the final version of the FRM-II safety report has been submitted to the nuclear licensing authority. (author)

  12. Centrifuge workers study. Phase II, completion report

    Energy Technology Data Exchange (ETDEWEB)

    Wooten, H.D.

    1994-09-01

    Phase II of the Centrifuge Workers Study was a follow-up to the Phase I efforts. The Phase I results had indicated a higher risk than expected among centrifuge workers for developing bladder cancer when compared with the risk in the general population for developing this same type of cancer. However, no specific agent could be identified as the causative agent for these bladder cancers. As the Phase II Report states, Phase I had been limited to workers who had the greatest potential for exposure to substances used in the centrifuge process. Phase II was designed to expand the survey to evaluate the health of all employees who had ever worked in Centrifuge Program Departments 1330-1339 but who had not been interviewed in Phase I. Employees in analytical laboratories and maintenance departments who provided support services for the Centrifuge Program were also included in Phase II. In December 1989, the Oak Ridge Associated Universities (ORAU), now known as Oak Ridge Institute for Science and Education (ORISE), was contracted to conduct a follow-up study (Phase II). Phase H of the Centrifuge Workers Study expanded the survey to include all former centrifuge workers who were not included in Phase I. ORISE was chosen because they had performed the Phase I tasks and summarized the corresponding survey data therefrom.

  13. Centrifuge workers study. Phase II, completion report

    International Nuclear Information System (INIS)

    Wooten, H.D.

    1994-09-01

    Phase II of the Centrifuge Workers Study was a follow-up to the Phase I efforts. The Phase I results had indicated a higher risk than expected among centrifuge workers for developing bladder cancer when compared with the risk in the general population for developing this same type of cancer. However, no specific agent could be identified as the causative agent for these bladder cancers. As the Phase II Report states, Phase I had been limited to workers who had the greatest potential for exposure to substances used in the centrifuge process. Phase II was designed to expand the survey to evaluate the health of all employees who had ever worked in Centrifuge Program Departments 1330-1339 but who had not been interviewed in Phase I. Employees in analytical laboratories and maintenance departments who provided support services for the Centrifuge Program were also included in Phase II. In December 1989, the Oak Ridge Associated Universities (ORAU), now known as Oak Ridge Institute for Science and Education (ORISE), was contracted to conduct a follow-up study (Phase II). Phase H of the Centrifuge Workers Study expanded the survey to include all former centrifuge workers who were not included in Phase I. ORISE was chosen because they had performed the Phase I tasks and summarized the corresponding survey data therefrom

  14. Spray Forming Aluminum - Final Report (Phase II)

    Energy Technology Data Exchange (ETDEWEB)

    D. D. Leon

    1999-07-08

    The U.S. Department of Energy - Office of Industrial Technology (DOE) has an objective to increase energy efficient and enhance competitiveness of American metals industries. To support this objective, ALCOA Inc. entered into a cooperative program to develop spray forming technology for aluminum. This Phase II of the DOE Spray Forming Program would translate bench scale spray forming technology into a cost effective world class process for commercialization. Developments under DOE Cooperative Agreement No. DE-FC07-94ID13238 occurred during two time periods due to budgetary constraints; April 1994 through September 1996 and October 1997 and December 1998. During these periods, ALCOA Inc developed a linear spray forming nozzle and specific support processes capable of scale-up for commercial production of aluminum sheet alloy products. Emphasis was given to alloys 3003 and 6111, both being commercially significant alloys used in the automotive industry. The report reviews research performed in the following areas: Nozzel Development, Fabrication, Deposition, Metal Characterization, Computer Simulation and Economics. With the formation of a Holding Company, all intellectual property developed in Phases I and II of the Project have been documented under separate cover for licensing to domestic producers.

  15. Technical realisation of the VISA-II project, phase I, part IV, IZ-165-o268-1962; Tehnicka realizacija projekta VISA-II, I faza (I-V), IV deo, IZ-165-o268-1962

    Energy Technology Data Exchange (ETDEWEB)

    Pavicevic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1962-12-15

    Project VISA-II is described in IX chapters as follows: introduction, definition of experiments and possibilities of performance; VISA-II channel, new experimental space in the RA reactor; hydraulic tests in the VISA-II channel; measurement of fast neutron and gamma flux in VISA-II channels; measurement of water flow through different VISA-2 irradiation capsules; fabrication of VISA-II capsules; corrosion and heavy water purity problems; safety problems of experiment VISA-2; experimental operation of VISA-II. This chapter VI includes documentation for each type of capsule, review about each experiment within the VISA-II project, the objective and purpose of the experiment as well as experimental device. [Serbo-Croat] Projekat VISA-2 opisan je u sledecih IX poglavlja: uvod, definicija eksperimenta VISA-2 i mogucnost njegovog izvodjenja; kanal VISA-2 novi eksperimentalni prostor u reaktoru RA; hidraulicna ispitivanja na tehnoloskom kanalu VISA-2; Realizacija merenja fluksa brzih neutrona i gama zracenja u kanalima VISA-2; merenje protoka vode kroz razne tipove kapsula VISA-2; Kapsule VISA-2 i njihova realizacija; problemi korozije i cistoce teske vode u projektu VISA-2; problemi sigurnosti eksperimenta VISA-2; probni pogon eksperimenta VISA-2. Ova VI glava elaborata sadrzi dokumentaciju za svaku vrstu kapsula, preglednu sliku o svakom eksperimentu u okviru projekta VISA-2, o njegovom cilju i nameni kao i o eksperimentalnom uredjaju.

  16. Kursk Operation Simulation and Validation Exercise - Phase II (KOSAVE II)

    National Research Council Canada - National Science Library

    Bauman, Walter

    1998-01-01

    ... (KOSAVE) Study (KOSAVE II) documents, in this report a statistical record of the Kursk battle, as represented in the KDB, for use as both a standalone descriptive record for historians, and as a baseline for a subsequent Phase...

  17. HPC Benchmark Suite NMx, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — In the phase II effort, Intelligent Automation Inc., (IAI) and University of Central Florida (UCF) propose to develop a comprehensive numerical test suite for...

  18. Murine Automated Urine Sampler (MAUS), Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — This SBIR Phase II effort involves the development of a novel rodent spaceflight habitat, focusing on care and monitoring of mice for gravitational physiology...

  19. High Resolution Autostereoscopic Cockpit Display, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — During this Phase II program Dimension Technologies Inc. (DTI) proposes to design and build an autostereoscopic (glasses-free 3D) LCD based aircraft cockpit display...

  20. Pavement performance evaluation, phase II : data collection.

    Science.gov (United States)

    2008-12-01

    Phase I and II of this study tested approximately 1500 rehabilitated pavements (asphalt and PCC) : throughout the State. These pavements ranged from 5 to 15 years old and were intended to develop a : snapshot of how various rehabilitations were perfo...

  1. Titanium Heat Pipe Thermal Plane, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of the Phase II program is to complete the development of the titanium heat pipe thermal plane and establish all necessary steps for production of this...

  2. Oxygen-Methane Thruster, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Two main innovations will be developed in the Phase II effort that are fundamentally associated with our gaseous oxygen/gaseous methane RCS thruster. The first...

  3. Innovation in the Sky, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — This Phase II proposal presents a scope of work to develop reliable Sense and Avoid for BVLOS Unmanned Aerial Vehicle [UAV] operations. We first analyze a) the...

  4. Crew Cerebral Oxygen Monitor, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — This Phase II SBIR proposal is aimed at developing a non-invasive, optical method for monitoring crew member state of awareness in operational environments. All...

  5. Silver Biocide Analysis & Control Device, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Rapid, accurate measurement and process control of silver ion biocide concentrations in future space missions is needed. The purpose of the Phase II program is to...

  6. Licensee Performance Evaluation: Phase II

    International Nuclear Information System (INIS)

    Chakoff, H.E.; Speaker, D.M.; Thompson, S.R.; Cohen, S.C.

    1979-08-01

    This report details work performed during the second phase of a two-phase contract to develop methodology for Licensee Performance Evaluation. The Phase I report, NUREG/CR-0110 details initial efforts on the contract. The model developed in Phase I was used to evaluate nine additional facilities for this report. Performance indicators from noncompliance data were also evaluated. Methodology was developed employing the noncompliance indicators and used for 12 case studies. It was found that licensee event report indicators could be more easily identified and utilized than noncompliance indicators based on presently available data systems. However, noncompliance data, appropriately related to cause, could provide real insight into why performance was what it was

  7. Small Business Innovation Research GRC Phase I, Phase II, and Post-Phase II Opportunity Assessment for 2015

    Science.gov (United States)

    Nguyen, Hung D.; Steele, Gynelle C.

    2016-01-01

    This report outlines the 2015 Small Business Innovation Research/Small Business Technology Transfer (SBIR/STTR) Phase I, Phase II, and Post-Phase II opportunity contract award results associated with NASA's Aeronautics Research Mission Directorate (ARMD), Human Exploration and Operations Mission Directorate (HEOMD), Science Mission Directorate (SMD), and Space Technology Mission Directorate (STMD) for NASA Glenn Research Center. The report also highlights the number of Phase I, Phase II, and Post-Phase II contracts awarded by mission directorate. The 2015 Phase I contract awards to companies in Ohio and their corresponding technologies are also discussed.

  8. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  9. Project Final Report: HPC-Colony II

    Energy Technology Data Exchange (ETDEWEB)

    Jones, Terry R [ORNL; Kale, Laxmikant V [University of Illinois, Urbana-Champaign; Moreira, Jose [IBM T. J. Watson Research Center

    2013-11-01

    This report recounts the HPC Colony II Project which was a computer science effort funded by DOE's Advanced Scientific Computing Research office. The project included researchers from ORNL, IBM, and the University of Illinois at Urbana-Champaign. The topic of the effort was adaptive system software for extreme scale parallel machines. A description of findings is included.

  10. Test of GERDA Phase II detector assembly

    Energy Technology Data Exchange (ETDEWEB)

    Bode, Tobias; Gusev, Konstantin [Technische Universitaet Muenchen (Germany); Schwingenheuer, Bernhard; Wagner, Victoria [Max-Planck Institut fuer Kernphysik, Heidelberg (Germany); Collaboration: GERDA-Collaboration

    2014-07-01

    The GERDA experiment searches for the lepton number violating neutrinoless double beta decay (0νββ) of {sup 76}Ge. The experiment uses HPGe detectors enriched in {sup 76}Ge as source and detection material. In GERDA Phase I five BEGe detectors were operated successfully. These detectors are distinguished for improved energy resolution and enhanced pulse shape discrimination (PSD) against background events. In Phase II additional 25 BEGe detectors will be installed. New electronics and radio-pure low-mass holders were specially designed for Phase II. Prior to the installation in GERDA all BEGe detectors are tested in their final assembly in the LNGS underground laboratory. This talk presents the mechanics and performance of the GERDA Phase II detector assembly.

  11. Upgrades for GERDA Phase II

    Science.gov (United States)

    Heisel, Mark

    2014-09-01

    The Germanium Detector Array (GERDA) experiment is searching for the neutrinoless double beta decay (0 νββ) of 76Ge. It is a process that violates lepton number conservation and is predicted to occur in extensions of the standard model of particle physics. GERDA is located underground in the Gran Sasso National Laboratory (LNGS), Italy. An array of bare high-purity germanium detectors enriched in 76Ge is operated in a cryostat with 64 m3 of liquid argon supplemented by a 3 m thick shield of water. The experiment aims at exploring the 0 νββ decay up to a half life of 2 .1026 yr in two phases: Phase I of the experiment has been concluded last year. No signal is observed and the so far best limit is derived for the half life of the 0 νββ decay of 76Ge, T1/20ν GERDA) experiment is searching for the neutrinoless double beta decay (0 νββ) of 76Ge. It is a process that violates lepton number conservation and is predicted to occur in extensions of the standard model of particle physics. GERDA is located underground in the Gran Sasso National Laboratory (LNGS), Italy. An array of bare high-purity germanium detectors enriched in 76Ge is operated in a cryostat with 64 m3 of liquid argon supplemented by a 3 m thick shield of water. The experiment aims at exploring the 0 νββ decay up to a half life of 2 .1026 yr in two phases: Phase I of the experiment has been concluded last year. No signal is observed and the so far best limit is derived for the half life of the 0 νββ decay of 76Ge, T1/20 ν GERDA Collaboration.

  12. Magnetic sensor for nondestructive evaluation of deteriorated prestressing strand : phase II.

    Science.gov (United States)

    2011-08-01

    This report gives an account of the execution and achievements in Phase II of the project completed through August 2011. The main objective of this project is to advance the practical development of a nondestructive testing and evaluation method usin...

  13. HORIZON 2020 - Project SITEX-II

    International Nuclear Information System (INIS)

    Nachmilner, L.

    2016-01-01

    In the mid of 2015 a coordination action SITEX-II was initiated within the EC programme Horizon 2020. It aims at implementing in practice activities along with the interaction models issued by the SITEX project (carried out within FP7 programme in 2012-13), in view of developing an Expertise function network. This network is expected to ensure sustainable capacity of developing and coordination joint and harmonised activities related to the independent technical expertise in the field of safety of deep geological disposal of radioactive waste. SITEX-II tasks include: • The definition of the Strategic Research Agenda (SRA) based on the common R orientations defined by SITEX, the definition of ToR for the implementation of specific topics of from the SRA, and the interaction with IGD-TP and other external entities mandated to implement research on radioactive waste disposal regarding the potential setting up of a respective European Joint Programming; • The production of a guidance on the technical review of the safety case at its different phases of development, fostering a common understanding on the interpretation and proper implementation of safety requirements for developing, operating and closing a geological repository and on then verification of compliance with these requirements; • The commitment of a Civil Society (CS) in the definition of the SRA mentioned above, considering the expectations and technical questions to be considered when developing R for the purpose of Expert function. Close interactions between experts conducting the review work and CS representatives will enhance establishing the safety culture and, more globally, proposing governance patterns with CS in the framework of geological disposal; • The preparation of the ‚administrative‘ framework for creating a sustainable network of Technical Safety Organisations from EU members states by addressing the legal organisational and management aspects. (author)

  14. R+D project KEWA. Cooperative development of economically efficient applications for environment, traffic and neighbouring fields in new administrative structures - phase II 2006/07; F+E-Vorhaben KEWA. Kooperative Entwicklung wirtschafticher Anwendungen fuer Umwelt, Verkehr und benachbarte Bereiche in neuen Verwaltungsstrukturen - Phase II 2006/07

    Energy Technology Data Exchange (ETDEWEB)

    Mayer-Foell, R.; Keitel, A.; Geiger, W. (eds.)

    2007-07-15

    The project aims at efficient use of resources and joint research on and development of new solutions in the provision of environmental and traffic information for administrations and the general public (E-Government). KEWA is thus a successor to the R+D projects Globale Umweltsachdaten (GLOBUS, 1994-1999) and Anwendung JAVA-basierter Loesungen in den Bereichen Umwelt, Verkehr und Verwaltung (AJA, 2000-2004). Phase I of the project covered the period between 1 January 2005 and 30 June 2006. Central issues were the further development of portal technologies including metadata and document processing, the development of reporting systems and geodata processing, and applications for processing of measured data and dispersion calculations, in particular in the fields of water and radiation protection. Further issues were the combination of environmental and traffic information and elements of E-Government. Phase II of the project, from 1 July 2006 to 30 June 2007, is presented in this report. The work of the first phase was continued, and concepts and applications were developed for meeting the specifications made by IuK-Verbund Land/Kommkjnen, e.g. the 2006 outline concept of UIS BAden-Wuerttemberg, KONZEPTION RIPS 2006 for the Baden-Wuerttemberg regional information and planning system, the WIBAS 2006 concept for the Information system for water, nuisance control, soil, waste, and land pollution, suplporting activities, and E-services for the general public. Further subjects were, e.g., interstate cooperations, e.g. in the development of surface water information systems and environmental information networks, metadata catalogues and standardized service catalogues. An important issue for KEWA is the EU regulation on Infrastructure for Spatial Information in the European Community - INSPIRE. (orig.)

  15. FEBEX II Project THG Laboratory Experiments

    International Nuclear Information System (INIS)

    Missana, T.

    2004-01-01

    The main roles of the bentonite in a radioactive waste repository is to act as a geochemical barrier against the radionuclides migration. The effectiveness of this geochemical barrier depends on the surface properties of the solid phases and on the physico-chemical environment generated by the interaction of the solid phases with the groundwater. Within the FEBEX (Full-scale Engineered Barriers Experiment) project, a program of laboratory tests was designed to study and to understand the processes taking place in the clay barrier. Since the first stages of the project, these laboratory tests enabled to isolate different processes, making easier their interpretation, and provided fundamental parameters to be used in the Thermo Hydro Mechanical (THM) and Thermo Hydro Geochemical (THG) models. Additionally, experimental data enabled to check the predictive capability of these models. In the second phase of the project, laboratory tests focused on all those relevant aspects not sufficiently covered during FEBEX I. Particularly, the following main objectives were proposed for the THG investigations during FEBEX II : Attainment of a reliable description of the pore water chemistry at different geochemical conditions. Identification of the different types of water present in the bentonite and to determine the amount of available water for the solute transport.Evaluation of the potential effects of the extraction pressure in the chemical composition of the water obtained by squeezing methods.Study of the effects of the exchange complex in the rheological properties of the clay.Identification and modelling of the surface processes occurring in smectite, determination of the solubility constants of smectite and the formation constants of the surface complexes.Understanding of the mechanisms involved in the sorption of different radionuclides in the bentonite. Investigation of the diffusion mechanisms of conservative neutral and anionic species to have a deeper insight on the

  16. FEBEX II Project THG Laboratory Experiments

    Energy Technology Data Exchange (ETDEWEB)

    Missana, T.

    2004-07-01

    The main roles of the bentonite in a radioactive waste repository is to act as a geochemical barrier against the radionuclides migration. The effectiveness of this geochemical barrier depends on the surface properties of the solid phases and on the physico-chemical environment generated by the interaction of the solid phases with the groundwater. Within the FEBEX (Full-scale Engineered Barriers Experiment) project, a program of laboratory tests was designed to study and to understand the processes taking place in the clay barrier. Since the first stages of the project, these laboratory tests enabled to isolate different processes, making easier their interpretation, and provided fundamental parameters to be used in the Thermo Hydro Mechanical (THM) and Thermo Hydro Geochemical (THG) models. Additionally, experimental data enabled to check the predictive capability of these models. In the second phase of the project, laboratory tests focused on all those relevant aspects not sufficiently covered during FEBEX I. Particularly, the following main objectives were proposed for the THG investigations during FEBEX II : Attainment of a reliable description of the pore water chemistry at different geochemical conditions. Identification of the different types of water present in the bentonite and to determine the amount of available water for the solute transport.Evaluation of the potential effects of the extraction pressure in the chemical composition of the water obtained by squeezing methods.Study of the effects of the exchange complex in the rheological properties of the clay.Identification and modelling of the surface processes occurring in smectite, determination of the solubility constants of smectite and the formation constants of the surface complexes.Understanding of the mechanisms involved in the sorption of different radionuclides in the bentonite. Investigation of the diffusion mechanisms of conservative neutral and anionic species to have a deeper insight on the

  17. Microbial Dark Matter Phase II: Stepping deeper into unknown territory

    Energy Technology Data Exchange (ETDEWEB)

    Jarett, Jessica; Dunfield, Peter; Peura, Sari; Wielen, Paul van der; Hedlund, Brian; Elshahed, Mostafa; Kormas, Konstantinos; Stott, Andreas Teske8, Matt; Birkeland, Nils-Kare; Zhang, Chuanlun; Rengefors, Karin; Lindemann, Stephen; Ravin, Nikolai V.; Spear, John; Hallam, Steven; Crowe, Sean; Steele, Jillian; Goudeau, Danielle; Malmstrom, Rex; Kyrpides, Nikos; Stepanauskas, Ramunas; Woyke, Tanja

    2014-10-27

    Currently available microbial genomes are of limited phylogenetic breadth due to our historical inability to cultivate most microorganisms in the laboratory. The first phase of the Microbial Dark Matter project used single-cell genomics to sequence 201 single cells from uncultivated lineages, and was able to resolve new superphyla and reveal novel metabolic features in bacteria and archaea. However, many fundamental questions about the evolution and function of microbes remain unanswered, and many candidate phyla remain uncharacterized. Phase II of the Microbial Dark Matter project will target candidate phyla with no sequenced representatives at a variety of new sites using a combination of single-cell sequencing and shotgun metagenomics approaches.

  18. The Sudbury Neutrino Observatory project and the Kamiokande II project

    International Nuclear Information System (INIS)

    Beier, E.W.

    1991-01-01

    This document is a technical progress report on work performed at the University of Pennsylvania during the current year on the Sudbury Neutrino Observatory project and on the Kamiokande II project. The motivation for both experiments is the measurement of neutrinos emitted by the sun. The Kamiokande II experiment was an adaptation of an existing nucleon decay detector located in Japan to search for neutrinos emitted by the sun. It has been operational since 1986. Data taking was concluded in 1990 and work will terminate at the end of this grant year. The topics discussed in this report are: the Sudbury Neutrino Observatory project; photomultiplier tube measurements; photomultiplier bases; signal processing electronics; electronics system issues; software management and development; and Kamiokande II

  19. A status report on the PBFA II construction project

    International Nuclear Information System (INIS)

    Barr, G.W.; Furaus, J.P.; Cook, D.L.; Shirley, C.G.

    1985-01-01

    The Particle Beam Fusion Accelerator II (PBFA II) is under construction at Sandia National Laboratories (SNL). PBFA II contains 36 individual power modules configured in a stacked radial geometry and synchronized to provide greater than 3.5 MJ of energy into the vacuum section in a single 55-ns-wide 90-TW peak power pulse. This R and D construction project is being implemented in a fast track schedule mode in which final design of the accelerator components occurs in parallel with the construction of the laboratory building and the accelerator tank. PBFA II is scheduled to become operational in January 1986 with its first multi-module shot into an applied-B ion diode that will generate and transport a beam of lithium ions. Plans are now being made for experimental work on PBFA II beyond the construction phase

  20. Status of the Gerda phase II experiment

    Energy Technology Data Exchange (ETDEWEB)

    Lazzaro, Andrea [Physik-Department and Excellence Cluster Universe, Technische Universitaet Muenchen (Germany); Collaboration: GERDA-Collaboration

    2016-07-01

    The Gerda experiment searches for the neutrinoless double beta decay (0νββ) in {sup 76}Ge. The first phase of the experiment collected 21.6 kg. yr of exposure with a background index (BI) of 0.01 cts/(keV . kg . yr). No signal was observed and a lower limit for the 0νββ half-life was set to T{sup 0νββ}{sub 1/2} < 2.1 . 10{sup 25} yr (90% C.L). The apparatus has now been upgraded to the Phase II configuration. In Phase II 38 kg of HPGe detectors will be operated to reach an exposure of 100 kg . yr. The goal of Gerda Phase II is to lower the BI to 10{sup -3} cts/(keV . kg . y), in order to reach the sensitivity for T{sup 0νββ}{sub 1/2} = O(10{sup 26}) yr. The additional target mass is constituted of 30 custom made BEGe detectors with higher energy resolution and better pulse shape discrimination performance. The detectors are operated in new radio-pure low-mass holders. The liquid argon surrounding the detectors has been instrumented to veto the background events which produce scintillation light. In this talk the current status and the performance of the Gerda Phase II are presented.

  1. Health Activities Project (HAP), Trial Edition II.

    Science.gov (United States)

    Buller, Dave; And Others

    Contained within this Health Activities Project (HAP) trial edition (set II) are a teacher information folio and numerous student activity folios which center around the idea that students in grades 5-8 can control their own health and safety. Each student folio is organized into a Synopsis, Health Background, Materials, Setting Up, and Activities…

  2. Toward an Integrated Psychological Approach - Phase II

    International Development Research Centre (IDRC) Digital Library (Canada)

    Trauma, Development and Peacebuilding : Toward an Integrated Psychological Approach - Phase II. Over the past decade, the peace, conflict and development community has begun to question the value of medicalized approaches such as post-traumatic stress disorder (PTSD) in dealing with aftermath of political violence ...

  3. LHC Experiments Phase II - TDRs Approval Process

    CERN Document Server

    Forti, F

    2017-01-01

    The overall review process and steps of Phase II were described in CERN-LHCC-2015-077. As experiments submit detailed technical design reports (TDRs), the LHCC and UCG work in close connection to ensure a timely review of the scientific and technical feasibility as well as of the budget and schedule of the upgrade programme.

  4. First results from GERDA Phase II

    Science.gov (United States)

    Agostini, M.; Allardt, M.; Bakalyarov, A. M.; Balata, M.; Barabanov, I.; Baudis, L.; Bauer, C.; Bellotti, E.; Belogurov, S.; Belyaev, S. T.; Benato, G.; Bettini, A.; Bezrukov, L.; Bode, T.; Borowicz, D.; Brudanin, V.; Brugnera, R.; Caldwell, A.; Cattadori, C.; Chernogorov, A.; D'Andrea, V.; Demidova, E. V.; Di Marco, N.; Domula, A.; Doroshkevich, E.; Egorov, V.; Falkenstein, R.; Frodyma, N.; Gangapshev, A.; Garfagnini, A.; Gooch, C.; Grabmayr, P.; Gurentsov, V.; Gusev, K.; Hakenmüller, J.; Hegai, A.; Heisel, M.; Hemmer, S.; Hofmann, W.; Hult, M.; Inzhechik, L. V.; Janicskó Csáthy, J.; Jochum, J.; Junker, M.; Kazalov, V.; Kihm, T.; Kirpichnikov, I. V.; Kirsch, A.; Kish, A.; Klimenko, A.; Kneißl, R.; Knöpfle, K. T.; Kochetov, O.; Kornoukhov, V. N.; Kuzminov, V. V.; Laubenstein, M.; Lazzaro, A.; Lebedev, V. I.; Lehnert, B.; Liao, H. Y.; Lindner, M.; Lippi, I.; Lubashevskiy, A.; Lubsandorzhiev, B.; Lutter, G.; Macolino, C.; Majorovits, B.; Maneschg, W.; Medinaceli, E.; Miloradovic, M.; Mingazheva, R.; Misiaszek, M.; Moseev, P.; Nemchenok, I.; Palioselitis, D.; Panas, K.; Pandola, L.; Pelczar, K.; Pullia, A.; Riboldi, S.; Rumyantseva, N.; Sada, C.; Salamida, F.; Salathe, M.; Schmitt, C.; Schneider, B.; Schönert, S.; Schreiner, J.; Schulz, O.; Schütz, A.-K.; Schwingenheuer, B.; Selivanenko, O.; Shevchik, E.; Shirchenko, M.; Simgen, H.; Smolnikov, A.; Stanco, L.; Vanhoefer, L.; Vasenko, A. A.; Veresnikova, A.; von Sturm, K.; Wagner, V.; Wegmann, A.; Wester, T.; Wiesinger, C.; Wojcik, M.; Yanovich, E.; Zhitnikov, I.; Zhukov, S. V.; Zinatulina, D.; Zuber, K.; Zuzel, G.

    2017-09-01

    Gerda is designed for a background-free search of 76Ge neutrinoless double-β decay, using bare Ge detectors in liquid Ar. The experiment was upgraded after the successful completion of Phase I to double the target mass and further reduce the background. Newly-designed Ge detectors were installed along with LAr scintillation sensors. Phase II of data-taking started in Dec 2015 with approximately 36 kg of Ge detectors and is currently ongoing. The first results based on 10.8 kg· yr of exposure are presented. The background goal of 10-3 cts/(keV· kg· yr) is achieved and a search for neutrinoless double-β decay is performed by combining Phase I and II data. No signal is found and a new limit is set at T1/20ν > 5.3 \\cdot {1025} yr (90% C.L.).

  5. Small Business Innovation Research, Post-Phase II Opportunity Assessment

    Science.gov (United States)

    Nguyen, Hung D.; Steele, Gynelle C.

    2015-01-01

    This report outlines current Small Business Innovation Research (SBIR) Post-Phase II opportunity contract award results for the SBIR technology program from 2007 to 2011 for NASA's Aeronautics Research Mission Directorate (ARMD), Human Exploration and Operations Mission Directorate (HEOMD), Science Mission Directorate (SMD), and Space Technology Mission Directorate (STMD). The report provides guidelines for incorporating SBIR technology into NASA programs and projects and provides a quantitative overview of the post-Phase II award patterns that correspond with each mission directorate at NASA Glenn Research Center (GRC). In recent years, one of NASA's goals has been to not only transfer SBIR technologies to commercial industries, but to ensure that NASA mission directorates incorporate SBIR technologies into their program and project activities. Before incorporating technologies into MD programs, it is important to understand each mission directorate structure because each directorate has different objectives and needs. The directorate program structures follow.

  6. 129I Interlaboratory comparison: phase I and phase II

    International Nuclear Information System (INIS)

    Caffee, M. W.; Roberts, M. L.

    1999-01-01

    An interlaboratory comparison exercise for 129 I was organized and conducted. Nine laboratories participated in the exercise to either a full or limited extent. In Phase I of the comparison, 11 samples were measured. The suite of samples contained both synthetic ''standard type'' materials (i.e., AgI) and environmental materials. The isotopic 129 I/ 127 I ratios of the samples varied from 10 -8 to 10 -14 . In this phase, each laboratory was responsible for its own chemical preparation of the samples. In Phase I, the 129 I AMS measurements for prepared AgI were in good agreement. However, large discrepancies were seen in 129 I AMS measurements of environmental samples. Because of the large discrepancies seen in the Phase I 129 I intercomparison, a subsequent study was conducted. In Phase II of the 129 I intercomparison, three separate laboratories prepared AgI from two environmental samples (IAEA 375 soil and maples leaves). Each laboratory used its own chemical preparation method with each of the methods being distinctly different. The resulting six samples (two sets of three) were then re-distributed to the participating 129 I AMS facilities and 129 I/ 127 I ratios measured. Results and discussion of both the Phase I and Phase II interlaboratory comparison are presented

  7. The STAR beam energy scan phase II physics and upgrades

    Czech Academy of Sciences Publication Activity Database

    Yang, C.; Adamczyk, L.; Adkins, J. K.; Agakishiev, G.; Bielčík, J.; Bielčíková, Jana; Chaloupka, P.; Federič, Pavol; Rusňák, Jan; Rusňáková, O.; Šimko, Miroslav; Šumbera, Michal; Vértési, Robert

    2017-01-01

    Roč. 967, č. 11 (2017), s. 800-803 ISSN 0375-9474 R&D Projects: GA MŠk LG15001; GA MŠk LM2015054 Institutional support: RVO:61389005 Keywords : STAR collaboration * BES-II * detector upgrade * QCD phase diagram * physics oppotrunity Subject RIV: BG - Nuclear, Atomic and Molecular Physics, Colliders OBOR OECD: Nuclear physics Impact factor: 1.916, year: 2016

  8. The Gerda Phase II detector assembly

    Energy Technology Data Exchange (ETDEWEB)

    Bode, Tobias; Schoenert, Stefan [Physik-Department E15, Technische Universitaet Muenchen (Germany); Schwingenheuer, Bernhard [Max-Planck-Institut fuer Kernphysik, Heidelberg (Germany); Collaboration: GERDA-Collaboration

    2013-07-01

    Phase II of the Gerda (Germanium Detector Array) experiment will continue the search for the neutrinoless double beta decay (0νββ) of {sup 76}Ge. Prerequisites for Phase II are an increased target mass and a reduced background index of < 10 {sup -3} cts/(keV.kg.yr). Major hardware upgrades to achieve these requirements are scheduled for 2013. They include the deployment of a new radio pure low mass detector assembly. The structural properties of available radio-pure materials and reduction of mass necessitate a change of the electrical contacting used to bias and read-out the detectors. The detector assembly design and the favored contacting solution are presented.

  9. PWR steam generator chemical cleaning. Phase II. Final report

    International Nuclear Information System (INIS)

    1980-01-01

    Two techniques believed capable of chemically dissolving the corrosion products in the annuli between tubes and support plates were developed in laboratory work in Phase I of this project and were pilot tested in Indian Point Unit No. 1 steam generators. In Phase II, one of the techniques was shown to be inadequate on an actual sample taken from an Indian Point Unit No. 2 steam generator. The other technique was modified slightly, and it was demonstrated that the tube/support plate annulus could be chemically cleaned effectively

  10. Mismanagement Reasons of the Projects Execution Phase

    Directory of Open Access Journals (Sweden)

    Hatem Khaleefah Al-Agele

    2017-10-01

    Full Text Available The execution phase of the project is most dangerous and the most drain on the resources during project life cycle, therefore, its need to monitor and control by specialists to exceeded obstructions and achieve the project goals. The study aims to detect the actual reasons behind mismanagement of the execution phase. The study begins with theoretical part, where it deals with the concepts of project, project selection, project management, and project processes. Field part consists of three techniques: 1- brainstorming, 2- open interviews with experts and 3- designed questionnaire (with 49 reason. These reasons result from brainstorming and interviewing with experts., in order to find the real reasons behind mismanagement of the execution phase. The most important reasons which are negatively impact on management of the execution phase that proven by the study were (Inability of company to meet project requirements because it's specialized and / or large project, Multiple sources of decision and overlap in powers, Inadequate planning, Inaccurate estimation of cost, Delayed cash flows by owners, Poor performance of project manager, inefficient decision making process, and the Negative impact of people in the project area. Finally, submitting a set of recommendations which will contribute to overcome the obstructions of successful management of the execution phase.

  11. Caspian energy phase II: Beyond 2005

    International Nuclear Information System (INIS)

    Shaffer, Brenda

    2010-01-01

    This article examines the major factors that will shape the second phase of Caspian oil and natural gas export. The article compares the prospects of the post-2005 period with the Caspian energy developments in the first decade and a half after independence. This article claims: One, political considerations will continue to play an important role in the decisions on export routes for and participants in Caspian energy production and export projects. However, those political considerations will produce different policies in phase two of Caspian energy production than they did in the first phase. Second, the relative influence and interest in the Caspian region of various global and regional powers have changed significantly from Caspian energy phase one to phase two. Third, the producers in the region are not as anxious for foreign investment as they were earlier. The major resources that will be developed in Caspian phase two are: new production of Azerbaijan's natural gas, extension to new markets and expansion of capacity of existing gas export routes; new production projects for Turkmenistan's natural gas and new pipelines; and additional Kazakhstani oil production and natural gas increased production and initiation of export.

  12. F/H Area Effluent Treatment Facility. Phase II. CAC basic data

    International Nuclear Information System (INIS)

    Collins, W.W.; O'Leary, C.D.

    1984-01-01

    Project objectives and requirements are listed for both Phase I and II. Schedule is listed with startup targeted for 1989. Storage facilities will be provided for both chemical and radioactive effluents. 8 figs., 19 tabs

  13. Advanced 3D Human Simulation Components with Thermal/Haptic Feedback and Tissue Deformation, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — In integrating the following three significant components for its research/research and development (R/R&D) effort, the power of this candidate Phase II project...

  14. Dynamic Flight Simulation Utilizing High Fidelity CFD-Based Nonlinear Reduced Order Model, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The Nonlinear Dynamic Flight Simulation (NL-DFS) system will be developed in the Phase II project by combining the classical nonlinear rigid-body flight dynamics...

  15. A High Energy and High Efficiency Spectral Shaping Single Frequency Fiber Laser, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — This SBIR phase II project proposes a single frequency high energy fiber laser system for coherent Lidar systems for remote sensing. Current state-of-art...

  16. Coordinated Control of Multi-Agent Systems in Rapidly Varying Environments, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The main objective of this Phase II STTR project is to develop advanced control algorithms that enable multiple autonomous agents to perform complex tasks in rapidly...

  17. OrFPGA: An Empirical Performance Tuning Tool for FPGA Designs, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — In this Phase II STTR project, RNET and its subcontractors are proposing to fully develop an empirical performance optimization tool called OrFPGA that efficiently...

  18. Advanced Nongray Radiation Module in the LOCI Framework for Combustion CFD, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Radiative heat fluxes are important in the design of launch vehicles for Project Constellation. In this Phase II STTR, CFDRC and its partner Mississippi State...

  19. Polymer-Reinforced, Nonbrittle, Lightweight Cryogenic Insulation for Reduced Life-Cycle Costs, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — This Phase II SBIR project focuses to continue developing cryogenic insulation foams that are flexible, deforming under compression. InnoSense LLC (ISL) demonstrated...

  20. 78 FR 76789 - Additional Connect America Fund Phase II Issues

    Science.gov (United States)

    2013-12-19

    ... inspection and copying during normal business hours in the FCC Reference Information Center, Portals II, 445... Phase I to Phase II. 2. Timing of Phase II Support Disbursements. In the USF/ICC Transformation Order... language in paragraph 180 of the USF/ICC Transformation Order. We now seek to more fully develop the record...

  1. Engineering design of a toroidal divertor for the EBT-S fusion device. Final report, Phase II. EBT-S divertor project

    International Nuclear Information System (INIS)

    Mai, L.P.; Malick, F.S.

    1981-01-01

    The mechanical, structural, thermal, electrical, and vacuum design of a magnetic toroidal divertor system for the Elmo Bumpy Torus (EBT-S) is presented. The EBT-S is a toroidal magnetic fusion device located at the ORNL that operates under steady state conditions. The engineering of the divertor was performed during the second of three phases of a program aimed at the selection, design, fabrication, and installation of a magnetic divertor for EBT-S. The magnetic analysis of the toroidal divertor was performed during Phase I of the program and has been reported in a separate document. In addition to the details of the divertor design, the modest modifications that are required to the EBT-S device and facility to accommodate the divertor system are presented

  2. Status of the GERDA Phase II upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Wagner, Victoria [Max-Planck-Insitut für Kernphysik, Heidelberg (Germany)

    2016-06-21

    The GERDA experiment is designed to search for neutrinoless double beta (0νββ) decay of {sup 76}Ge. In Phase I of the experiment a background index of 10{sup −2} cts/(keV·kg·yr) was reached. A lower limit on the half-life of the 0νββ decay of {sup 76}Ge was set to 2.1·10{sup 25} yr (at 90% C.L.). The aim of Phase II is to reach a sensitivity of the half-life of about 10{sup 26} yr. To increase the exposure thirty new Broad Energy Germanium (BEGe) detectors have been produced. These detectors are distinct for their improved energy resolution and enhanced pulse shape discrimination of signal from background events. Further background reduction will be reached by a light instrumentation to read out argon scintillation light. In April 2015 the light instrumentation together with eight BEGe detectors has been successfully deployed in the GERDA cryostat. In a commissioning run it was shown that two of the major background components, external γ-rays from {sup 214}Bi and {sup 208}Tl decays, were suppressed up to two orders of magnitude. We are confident to reach a background index of 10{sup −3} cts/(keV·kg·yr) which is the design goal for GERDA Phase II.

  3. Status of the GERDA Phase II upgrade

    Science.gov (United States)

    Wagner, Victoria

    2016-06-01

    The GERDA experiment is designed to search for neutrinoless double beta (0νββ) decay of 76Ge. In Phase I of the experiment a background index of 10-2 cts/(keV.kg.yr) was reached. A lower limit on the half-life of the 0νββ decay of 76Ge was set to 2.1.1025 yr (at 90% C.L.). The aim of Phase II is to reach a sensitivity of the half-life of about 1026 yr. To increase the exposure thirty new Broad Energy Germanium (BEGe) detectors have been produced. These detectors are distinct for their improved energy resolution and enhanced pulse shape discrimination of signal from background events. Further background reduction will be reached by a light instrumentation to read out argon scintillation light. In April 2015 the light instrumentation together with eight BEGe detectors has been successfully deployed in the GERDA cryostat. In a commissioning run it was shown that two of the major background components, external γ-rays from 214Bi and 208Tl decays, were suppressed up to two orders of magnitude. We are confident to reach a background index of 10-3 cts/(keV.kg.yr) which is the design goal for GERDA Phase II.

  4. Status of the GERDA Phase II upgrade

    International Nuclear Information System (INIS)

    Wagner, Victoria

    2016-01-01

    The GERDA experiment is designed to search for neutrinoless double beta (0νββ) decay of "7"6Ge. In Phase I of the experiment a background index of 10"−"2 cts/(keV·kg·yr) was reached. A lower limit on the half-life of the 0νββ decay of "7"6Ge was set to 2.1·10"2"5 yr (at 90% C.L.). The aim of Phase II is to reach a sensitivity of the half-life of about 10"2"6 yr. To increase the exposure thirty new Broad Energy Germanium (BEGe) detectors have been produced. These detectors are distinct for their improved energy resolution and enhanced pulse shape discrimination of signal from background events. Further background reduction will be reached by a light instrumentation to read out argon scintillation light. In April 2015 the light instrumentation together with eight BEGe detectors has been successfully deployed in the GERDA cryostat. In a commissioning run it was shown that two of the major background components, external γ-rays from "2"1"4Bi and "2"0"8Tl decays, were suppressed up to two orders of magnitude. We are confident to reach a background index of 10"−"3 cts/(keV·kg·yr) which is the design goal for GERDA Phase II.

  5. ENER-IURE Project. Analysis of the legislation regarding renewable energy sources in the E.U. member states. Phase II. Fiscal measures and subsidies

    International Nuclear Information System (INIS)

    Alakangas, E.; Janka, P.

    2000-03-01

    The aim of the ENER-IURE project is to contribute towards a better knowledge of the legal, juridical and administrative barriers that renewable energy sources face today. The legislation of the different member states has been analysed during 1998 - 1999 focusing in four main aspects (a) Financial (Fiscal and subsidies measures) (b) Electricity, (c) Planning and Environment (d) Agriculture and Biomass. The report concerning fiscal measures and subsidies in Finland is divided into three parts: the basis report, the analysis report and the conclusion part. The basis report includes taxation, subsidies granted for energy investments, projects and energy conservation as well as subsidies for forestry operations. The analysis report includes energy taxation, investment aid and energy research. The Act on the Excise Tax Levied on Electricity and on Certain Fuels, issued in Helsinki on 30 December 1996 is included as an appendix in the report

  6. Oral Historical, Documentary, and Archaeological Investigations of Colbert, Barton, and Vinton, Mississippi: An Interim Report on Phase I of the Tombigbee Historic Townsites Project. Volume II.

    Science.gov (United States)

    1982-05-01

    newcomer to the area. most of his infor- mation was secondhand . However, person and nlace names h nroi.ied zuiced the initial research for this proiect...written many books on Mississinni -ilstrx.. . imrortance his interview to the project is his concise sv-nopis ,: oca1 li t ,r . ! was most familiar... Books of Insane Hospital, 1371-19&0 (Lowndes and Monroe counties) Business Letters (Insurance Companies) IF72-78, 1375-76, :373 (Clay. Lowndes, and

  7. PROJECT GOVERNANCE – PHASES AND LIFE CYCLE

    Directory of Open Access Journals (Sweden)

    Robbert Titus DEENEN

    2007-01-01

    Full Text Available When talking about projects, the barrier is clear: successful and failed. Some fail due to different reasons, but lack of good project and risk management played a large part. Others succeed largely because of the rigorous and disciplined application of good project practices. But both groups illustrate many points that underline and demonstrate important concepts applicable to current projects. Systematic application of good methods leads to successful outcomes in projects of all types. All projects are fundamentally dependent on people, and human beings are not very different today than we were hundreds, or even thousands, of years ago. This paper uncovers main elements in projects area such as the concepts and governance of projects, with an underline of the main characteristics and the projects phases and life cycle that erase the uncertainty that joins all the projects built at any time.

  8. Mercury Oxidation via Catalytic Barrier Filters Phase II

    Energy Technology Data Exchange (ETDEWEB)

    Wayne Seames; Michael Mann; Darrin Muggli; Jason Hrdlicka; Carol Horabik

    2007-09-30

    In 2004, the Department of Energy National Energy Technology Laboratory awarded the University of North Dakota a Phase II University Coal Research grant to explore the feasibility of using barrier filters coated with a catalyst to oxidize elemental mercury in coal combustion flue gas streams. Oxidized mercury is substantially easier to remove than elemental mercury. If successful, this technique has the potential to substantially reduce mercury control costs for those installations that already utilize baghouse barrier filters for particulate removal. Completed in 2004, Phase I of this project successfully met its objectives of screening and assessing the possible feasibility of using catalyst coated barrier filters for the oxidation of vapor phase elemental mercury in coal combustion generated flue gas streams. Completed in September 2007, Phase II of this project successfully met its three objectives. First, an effective coating method for a catalytic barrier filter was found. Second, the effects of a simulated flue gas on the catalysts in a bench-scale reactor were determined. Finally, the performance of the best catalyst was assessed using real flue gas generated by a 19 kW research combustor firing each of three separate coal types.

  9. Combined Final Report for Colony II Project

    Energy Technology Data Exchange (ETDEWEB)

    Kale, Laxmikant [University of Illinois; Jones, Terry [Oak Ridge National Laboratory; Moreira, Jose [IBM Corp.

    2013-10-23

    (This report was originally submmited by the lead PI (Terry Jones, ORNL) on October 22, 2013 to the program manager, Lucy Nowell. It is being submitted from University of Illinois in accordance with instructions). HPC Colony II seeks to provide portable performance for leadership class machines. Our strategy is based on adaptive system software that aims to make the intelligent decisions necessary to allow domain scientists to safely focus on their task at hand and allow the system software stack to adapt their application to the underlying architecture. This report describes the research undertaken towards these objectives and the results obtained over the performance period of the project.

  10. LAr instrumentation for Gerda phase II

    Energy Technology Data Exchange (ETDEWEB)

    Wegmann, Anne [Max-Planck-Institut fuer Kernphysik, Heidelberg (Germany); Collaboration: GERDA-Collaboration

    2015-07-01

    Gerda is an experiment to search for the neutrinoless double beta decay of {sup 76}Ge. Results of Phase I have been published in summer 2013. Currently the commissioning of Gerda Phase II is ongoing. To reach the aspired background index of ≤10{sup -3} cts/(keV.kg.yr) active background-suppression techniques will be applied, including an active liquid argon veto (LAr veto). It has been demonstrated by the LArGe test facility that the detection of argon scintillation light can be used to effectively suppress background events in the germanium, which simultaneously deposit energy in LAr. The light instrumentation consisting of photomultiplier tubes (PMT) and wavelength-shifting fibers connected to silicon multipliers (SiPM) has been installed in Gerda. In this talk the low background design of the LAr veto and its performance during the commissioning runs are reported.

  11. Performance of GERDA phase II BEGe detectors

    Energy Technology Data Exchange (ETDEWEB)

    Wagner, Victoria [Max-Planck Institut fuer Kernphysik (Germany); Collaboration: GERDA-Collaboration

    2015-07-01

    The GERDA experiment searches for the lepton number violating neutrinoless double beta (0νββ) decay of {sup 76}Ge. GERDA uses HPGe detectors enriched in {sup 76}Ge as source and detection material. The experiment proceeds in two phases. In Phase I a background index of 10{sup -2} cts/(keV.kg.yr) was reached and a new lower limit on the half-life of the 0νββ decay of {sup 76}Ge was set to 2.1.10{sup 25} yr (at 95% C.L.). In Phase II the background index will be lowered by an order of magnitude and a sensitivity of 10{sup 26} yr will be reached. In order to achieve this goal 30 new custom-made broad energy germanium (BEGe) detectors and a liquid argon scintillation light veto will be deployed. Five BEGe detectors have been operated successfully in Phase I and demonstrated their improved energy resolution and enhanced pulse shape discrimination (PSD) against background events. Special designed electronics will further improve energy resolution and PSD performance. The first results from commissioning of the new BEGe detectors are presented in this talk.

  12. Pretest Predictions for Phase II Ventilation Tests

    International Nuclear Information System (INIS)

    Yiming Sun

    2001-01-01

    The objective of this calculation is to predict the temperatures of the ventilating air, waste package surface, and concrete pipe walls that will be developed during the Phase II ventilation tests involving various test conditions. The results will be used as inputs to validating numerical approach for modeling continuous ventilation, and be used to support the repository subsurface design. The scope of the calculation is to identify the physical mechanisms and parameters related to thermal response in the Phase II ventilation tests, and describe numerical methods that are used to calculate the effects of continuous ventilation. The calculation is limited to thermal effect only. This engineering work activity is conducted in accordance with the ''Technical Work Plan for: Subsurface Performance Testing for License Application (LA) for Fiscal Year 2001'' (CRWMS M and O 2000d). This technical work plan (TWP) includes an AP-2.21Q, ''Quality Determinations and Planning for Scientific, Engineering, and Regulatory Compliance Activities'', activity evaluation (CRWMS M and O 2000d, Addendum A) that has determined this activity is subject to the YMP quality assurance (QA) program. The calculation is developed in accordance with the AP-3.12Q procedure, ''Calculations''. Additional background information regarding this activity is contained in the ''Development Plan for Ventilation Pretest Predictive Calculation'' (DP) (CRWMS M and O 2000a)

  13. Integrated monitoring and surveillance system demonstration project: Phase I accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Crawford, D.C.

    1997-01-01

    The authors present the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase I efforts. The rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include decisions to use Echelon LonWorks networking protocol and Microsoft Access for the data system needs, a preliminary design for the plutonium canning system glovebox, identification of facilities and materials available for the demonstration, determination of possibly affected facility documentation, and a preliminary list of available sensor technologies. Recently imposed changes in the overall project schedule and scope are also discussed and budgetary requirements for competition of Phase II presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase I deliverables

  14. DUST AND GAS IN THE MAGELLANIC CLOUDS FROM THE HERITAGE HERSCHEL KEY PROJECT. II. GAS-TO-DUST RATIO VARIATIONS ACROSS INTERSTELLAR MEDIUM PHASES

    International Nuclear Information System (INIS)

    Roman-Duval, Julia; Gordon, Karl D.; Meixner, Margaret; Bot, Caroline; Bolatto, Alberto; Jameson, Katherine; Hughes, Annie; Hony, Sacha; Wong, Tony; Babler, Brian; Bernard, Jean-Philippe; Clayton, Geoffrey C.; Fukui, Yasuo; Galametz, Maud; Galliano, Frederic; Lebouteiller, Vianney; Lee, Min-Young; Glover, Simon; Israel, Frank; Li, Aigen

    2014-01-01

    The spatial variations of the gas-to-dust ratio (GDR) provide constraints on the chemical evolution and lifecycle of dust in galaxies. We examine the relation between dust and gas at 10-50 pc resolution in the Large and Small Magellanic Clouds (LMC and SMC) based on Herschel far-infrared (FIR), H I 21 cm, CO, and Hα observations. In the diffuse atomic interstellar medium (ISM), we derive the GDR as the slope of the dust-gas relation and find GDRs of 380 −130 +250 ± 3 in the LMC, and 1200 −420 +1600 ± 120 in the SMC, not including helium. The atomic-to-molecular transition is located at dust surface densities of 0.05 M ☉  pc –2 in the LMC and 0.03 M ☉  pc –2 in the SMC, corresponding to A V ∼ 0.4 and 0.2, respectively. We investigate the range of CO-to-H 2 conversion factor to best account for all the molecular gas in the beam of the observations, and find upper limits on X CO to be 6 × 10 20  cm –2  K –1  km –1 s in the LMC (Z = 0.5 Z ☉ ) at 15 pc resolution, and 4 × 10 21  cm –2  K –1  km –1 s in the SMC (Z = 0.2 Z ☉ ) at 45 pc resolution. In the LMC, the slope of the dust-gas relation in the dense ISM is lower than in the diffuse ISM by a factor ∼2, even after accounting for the effects of CO-dark H 2 in the translucent envelopes of molecular clouds. Coagulation of dust grains and the subsequent dust emissivity increase in molecular clouds, and/or accretion of gas-phase metals onto dust grains, and the subsequent dust abundance (dust-to-gas ratio) increase in molecular clouds could explain the observations. In the SMC, variations in the dust-gas slope caused by coagulation or accretion are degenerate with the effects of CO-dark H 2 . Within the expected 5-20 times Galactic X CO range, the dust-gas slope can be either constant or decrease by a factor of several across ISM phases. Further modeling and observations are required to break the degeneracy between dust grain coagulation, accretion, and CO-dark H 2

  15. DUST AND GAS IN THE MAGELLANIC CLOUDS FROM THE HERITAGE HERSCHEL KEY PROJECT. II. GAS-TO-DUST RATIO VARIATIONS ACROSS INTERSTELLAR MEDIUM PHASES

    Energy Technology Data Exchange (ETDEWEB)

    Roman-Duval, Julia; Gordon, Karl D.; Meixner, Margaret [Space Telescope Science Institute, 3700 San Martin Drive, Baltimore, MD 21218 (United States); Bot, Caroline [Observatoire astronomique de Strasbourg, Université de Strasbourg, CNRS, UMR 7550, 11 rue de l' université, F-67000 Strasbourg (France); Bolatto, Alberto; Jameson, Katherine [Department of Astronomy, Lab for Millimeter-wave Astronomy, University of Maryland, College Park, MD 20742-2421 (United States); Hughes, Annie; Hony, Sacha [Max-Planck-Institut für Astronomie, Königstuhl 17, D-69117 Heidelberg (Germany); Wong, Tony [University of Illinois at Urbana-Champaign, 1002 W. Green St., Urbana, IL 61801 (United States); Babler, Brian [Department of Astronomy, University of Wisconsin, 475 North Charter St., Madison, WI 53706 (United States); Bernard, Jean-Philippe [CNRS, IRAP, 9 Av. colonel Roche, BP 44346, F-31028 Toulouse Cedex 4 (France); Clayton, Geoffrey C. [Louisiana State University, Department of Physics and Astronomy, 233-A Nicholson Hall, Tower Dr., Baton Rouge, LA 70803-4001 (United States); Fukui, Yasuo [Department of Physics, Nagoya University, Chikusa-ku, Nagoya 464-8602 (Japan); Galametz, Maud [European Southern Observatory, Karl-Schwarzschild-Str 2, D-85748 Garching (Germany); Galliano, Frederic; Lebouteiller, Vianney; Lee, Min-Young [CEA, Laboratoire AIM, Irfu/SAp, Orme des Merisiers, F-91191 Gif-sur-Yvette (France); Glover, Simon [Zentrum für Astronomie, Institut für Theoretische Astrophysik, Universität Heidelberg, Albert-Ueberle Strasse 2, D-69120 Heidelberg (Germany); Israel, Frank [Sterrewacht Leiden, Leiden University, P.O. Box 9513, NL-2300 RA Leiden (Netherlands); Li, Aigen, E-mail: duval@stsci.edu [314 Physics Building, Department of Physics and Astronomy, University of Missouri, Columbia, MO 65211 (United States); and others

    2014-12-20

    The spatial variations of the gas-to-dust ratio (GDR) provide constraints on the chemical evolution and lifecycle of dust in galaxies. We examine the relation between dust and gas at 10-50 pc resolution in the Large and Small Magellanic Clouds (LMC and SMC) based on Herschel far-infrared (FIR), H I 21 cm, CO, and Hα observations. In the diffuse atomic interstellar medium (ISM), we derive the GDR as the slope of the dust-gas relation and find GDRs of 380{sub −130}{sup +250} ± 3 in the LMC, and 1200{sub −420}{sup +1600} ± 120 in the SMC, not including helium. The atomic-to-molecular transition is located at dust surface densities of 0.05 M {sub ☉} pc{sup –2} in the LMC and 0.03 M {sub ☉} pc{sup –2} in the SMC, corresponding to A {sub V} ∼ 0.4 and 0.2, respectively. We investigate the range of CO-to-H{sub 2} conversion factor to best account for all the molecular gas in the beam of the observations, and find upper limits on X {sub CO} to be 6 × 10{sup 20} cm{sup –2} K{sup –1} km{sup –1} s in the LMC (Z = 0.5 Z {sub ☉}) at 15 pc resolution, and 4 × 10{sup 21} cm{sup –2} K{sup –1} km{sup –1} s in the SMC (Z = 0.2 Z {sub ☉}) at 45 pc resolution. In the LMC, the slope of the dust-gas relation in the dense ISM is lower than in the diffuse ISM by a factor ∼2, even after accounting for the effects of CO-dark H{sub 2} in the translucent envelopes of molecular clouds. Coagulation of dust grains and the subsequent dust emissivity increase in molecular clouds, and/or accretion of gas-phase metals onto dust grains, and the subsequent dust abundance (dust-to-gas ratio) increase in molecular clouds could explain the observations. In the SMC, variations in the dust-gas slope caused by coagulation or accretion are degenerate with the effects of CO-dark H{sub 2}. Within the expected 5-20 times Galactic X {sub CO} range, the dust-gas slope can be either constant or decrease by a factor of several across ISM phases. Further modeling

  16. NNWSI Phase II materials interaction test procedure and preliminary results

    International Nuclear Information System (INIS)

    Bates, J.K.; Gerding, T.J.

    1985-01-01

    The Nevada Nuclear Waste Storage Investigations (NNWSI) project is investigating the volcanic tuff beds of Yucca Mountain, Nevada, as a potential location for a high-level radioactive waste repository. This report describes a test method (Phase II) that has been developed to measure the release of radionuclides from the waste package under simulated repository conditions, and provides information on materials interactions that may occur in the repository. The results of 13 weeks of testing using the method are presented, and an analog test is described that investigates the relationship between the test method and expected repository conditions. 9 references, 10 figures, 11 tables

  17. ATCA - thermal management study for the ATLAS phase II upgrades

    CERN Document Server

    Bortolin, Claudio; Kalinowski, Michal; Koziol, Piotr; Mendez, Julian; Walerianczyk, Jan; Zwalinski, Lukasz

    2017-01-01

    The AdvancedTCA (ATCA) telecom industry standard has been selected as the hardware platform for the “Phase-II Upgrade” of ATLAS at the Large Hadron Collider (LHC) at CERN. In November 2014 a project dedicated to the study of the impact of the ATCA integration in the actual counting rooms was launched analysing the impact on the cooling infrastructures. A spare rack equipped with two ATCA shelves, high power dissipating load blades, temperature and air velocity sensors were installed in a lab. Vertical and horizontal cooling performance were checked and some crtitical aspects identified.

  18. ATCA - thermal management study for the ATLAS phase II upgrades

    OpenAIRE

    Bortolin, Claudio; Dyngosz, Damian; Kalinowski, Michal; Koziol, Piotr; Mendez, Julian; Walerianczyk, Jan; Zwalinski, Lukasz

    2017-01-01

    The AdvancedTCA (ATCA) telecom industry standard has been selected as the hardware platform for the “Phase-II Upgrade” of ATLAS at the Large Hadron Collider (LHC) at CERN. In November 2014 a project dedicated to the study of the impact of the ATCA integration in the actual counting rooms was launched analysing the impact on the cooling infrastructures. A spare rack equipped with two ATCA shelves, high power dissipating load blades, temperature and air velocity sensors were installed in a lab....

  19. Phase-II Associative Memory ASIC Specifications

    CERN Document Server

    Stabile, Alberto; Warren, Matthew; Green, Barry; Konstantinidis, Nikolaos; Motuk, Halil Erdem; Frontini, Luca; Liberali, Valentino; Crescioli, Francesco; Fedi, Giacomo; Sotiropoulou, Calliope-louisa; De Canio, Francesco; Traversi, Gianluca; Shojaii, Seyed Ruhollah; Kubota, Takashi; Calderini, Giovanni; Palla, Fabrizio; Checcucci, Bruno; Spiller, Laurence Anthony; Mcnamara, Peter Charles

    2018-01-01

    This documents defines the specifications for the Associative Memory ASIC for Phase-II. The work-flow toward the final ASIC is organized in the following three steps • AM08 prototype: small area MPW prototype to test all the full custom features, the VHDL logic and the I/O. This chip must be fully functional with smaller memory area than the final ASIC; • AM09pre pre-production: full area ASIC to be fabricated with a full-mask set pilot run. Production corner wafers will be created; • AM09 production: full area ASIC with refinements for the mass production. The AM09 will be developed built on the AM08 extending the memory area, therefore the specification of both versions must be compatible.

  20. The PEP-II project-wide database

    International Nuclear Information System (INIS)

    Chan, A.; Calish, S.; Crane, G.; MacGregor, I.; Meyer, S.; Wong, J.

    1995-05-01

    The PEP-II Project Database is a tool for monitoring the technical and documentation aspects of this accelerator construction. It holds the PEP-II design specifications, fabrication and installation data in one integrated system. Key pieces of the database include the machine parameter list, magnet and vacuum fabrication data. CAD drawings, publications and documentation, survey and alignment data and property control. The database can be extended to contain information required for the operations phase of the accelerator and detector. Features such as viewing CAD drawing graphics from the database will be implemented in the future. This central Oracle database on a UNIX server is built using ORACLE Case tools. Users at the three collaborating laboratories (SLAC, LBL, LLNL) can access the data remotely, using various desktop computer platforms and graphical interfaces

  1. Holifield Heavy Ion Research Facility. Phase II

    International Nuclear Information System (INIS)

    Ball, J.B.; Hudson, E.D.; Lord, R.S.; Johnson, J.W.; Martin, J.A.; McNeilly, G.S.; Milner, W.T.; Mosko, S.W.; Sayer, R.O.; Robinson, R.L.

    1979-01-01

    The Holifield Heavy Ion Research Facility, with the completion of Phase I in late 1979, will include the Oak Ridge Isochronous Cyclotron (ORIC) and associated research areas, the new 25 MV tandem accelerator with new research areas for tandem beams, and modifications to utilize the ORIC as a booster accelerator. The combination of the tandem and ORIC will provide beam energies of 25 MeV/A for light heavy ions and 6 MeV/A up to A = 160. This paper discusses plans for a Phase II expansion of the facility to include an isochronous cyclotron with superconducting magnet and reconfiguration of the existing research areas and the ORIC vault to handle the higher energy beams from the new cyclotron. The new booster cyclotron is a low-flutter high-spiral design patterned after the MSU K = 800 design, with a central magnetic field of about 5 tesla and an extraction radius of 1 meter. The new beam transport system will incorporate an rf beam-splitter system that will be able to deliver successive beam pulses to two or three experiment areas

  2. Yakima Basin Fish Passage Project, Phase 2

    International Nuclear Information System (INIS)

    1991-08-01

    Implementation of the Yakima Basin Fish Passage Project -- Phase 2 would significantly improve the production of anadromous fish in the Yakima River system. The project would provide offsite mitigation and help to compensate for lower Columbia River hydroelectric fishery losses. The Phase 2 screens would allow greater numbers of juvenile anadromous fish to survive. As a consequence, there would be higher returns of adult salmon and steelhead to the Yakima River. The proposed action would play an integral part in the overall Yakima River anadromous fish enhancement program (fish passage improvement, habitat enhancement, hatchery production increases, and harvest management). These would be environmental benefits associated with implementation of the Fish Passage and Protective Facilities Phase 2 Project. Based on the evaluation presented in this assessment, there would be no significant adverse environmental impacts if the proposed action was carried forward. No significant adverse environmental effects have been identified from construction and operation of the Yakima Phase 2 fish passage project. Proper design and implementation of the project will ensure no adverse effects will occur. Based on the information in this environmental analysis, BPA's and Reclamation's proposal to construct these facilities does not constitute a major Federal action that could significantly affect the quality of the human environment. 8 refs., 4 figs., 6 tabs

  3. Phased Retrofits in Existing Homes in Florida Phase II: Shallow Plus Retrofits

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, K. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Parker, D. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Martin, E. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Chasar, D. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Amos, B. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States)

    2016-02-03

    The BAPIRC team and Florida Power and Light (FPL) electric utility pursued a pilot phased energy-efficiency retrofit program in Florida by creating detailed data on the energy and economic performance of two levels of retrofit - simple and deep. For this Phased Deep Retrofit (PDR) project, a total of 56 homes spread across the utility partner's territory in east central Florida, southeast Florida, and southwest Florida were instrumented between August 2012 and January 2013, and received simple pass-through retrofit measures during the period of March 2013 - June 2013. Ten of these homes received a deeper package of retrofits during August 2013 - December 2013. A full account of Phase I of this project, including detailed home details and characterization, is found in Parker et al, 2015 (currently in draft). Phase II of this project, which is the focus of this report, applied the following additional retrofit measures to select homes that received a shallow retrofit in Phase I: a) Supplemental mini-split heat pump (MSHP) (6 homes); b) Ducted and space coupled Heat Pump Water Heater (8 homes); c) Exterior insulation finish system (EIFS) (1 homes); d) Window retrofit (3 homes); e) Smart thermostat (21 homes: 19 NESTs; 2 Lyrics); f) Heat pump clothes dryer (8 homes); g) Variable speed pool pump (5 homes).

  4. High Performance Wafer-Based Capillary Electrochromatography, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The Phase II research comprises designing, constructing, and testing a chip-based capillary electrochromatography (CEC) prototype for separation and analysis of...

  5. Laser projection using generalized phase contrast

    DEFF Research Database (Denmark)

    Glückstad, Jesper; Palima, Darwin; Rodrigo, Peter John

    2007-01-01

    is introduced. An arbitrary phase shift filter eliminates the need for high-frequency modulation and conjugate phase encoding. This lowers device performance requirements and allows practical implementation with currently available dynamic spatial light modulators. (c) 2007 Optical Society of America.......We demonstrate experimental laser projection of a gray-level photographic image with 74% light efficiency using the generalized phase contrast (GPC) method. In contrast with a previously proposed technique [Alonzo et al., New J. Phys. 9, 132 (2007)], a new approach to image construction via GPC...

  6. Improved Metal-Polymeric Laminate Radiation Shielding, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — In this proposed Phase II program, builds on the phase I feaibility where a multifunctional lightweight radiation shield composite was developed and fabricated. This...

  7. Reclaimable Thermally Reversible Polymers for AM Feedstock, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — CRG proposes to continue efforts from the 2016 NASA SBIR Phase I topic H5.04 Reclaimable Thermally Reversible Polymers for AM Feedstock. In Phase II, CRG will refine...

  8. Single Electron Transistor Platform for Microgravity Proteomics, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — This Phase II program builds from the successful Phase I efforts to demonstrate that Quantum Logic Devices' nanoelectronic platform for biological detection could...

  9. Pressure Controlled Heat Pipe for Precise Temperature Control, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The principal Phase II objective is to refine and further develop the prototype PCHP into a useful thermal management tool. The Phase I program established the...

  10. Compact 2-Micron Transmitter for Remote Sensing Applications, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — In this Phase II effort we propose to work with NASA to extend the Phase I achievements, which focused on design and development of very compact master and...

  11. The role of technology in reducing health care costs. Phase II and phase III.

    Energy Technology Data Exchange (ETDEWEB)

    Cilke, John F.; Parks, Raymond C.; Funkhouser, Donald Ray; Tebo, Michael A.; Murphy, Martin D.; Hightower, Marion Michael; Gallagher, Linda K.; Craft, Richard Layne, II; Garcia, Rudy John

    2004-04-01

    In Phase I of this project, reported in SAND97-1922, Sandia National Laboratories applied a systems approach to identifying innovative biomedical technologies with the potential to reduce U.S. health care delivery costs while maintaining care quality. The effort provided roadmaps for the development and integration of technology to meet perceived care delivery requirements and an economic analysis model for development of care pathway costs for two conditions: coronary artery disease (CAD) and benign prostatic hypertrophy (BPH). Phases II and III of this project, which are presented in this report, were directed at detailing the parameters of telemedicine that influence care delivery costs and quality. These results were used to identify and field test the communication, interoperability, and security capabilities needed for cost-effective, secure, and reliable health care via telemedicine.

  12. An Overview of 2014 SBIR Phase I and Phase II Materials Structures for Extreme Environments

    Science.gov (United States)

    Nguyen, Hung D.; Steele, Gynelle C.; Morris, Jessica R.

    2015-01-01

    NASA's Small Business Innovation Research (SBIR) program focuses on technological innovation by investing in development of innovative concepts and technologies to help NASA mission directorates address critical research needs for Agency programs. This report highlights nine of the innovative SBIR 2014 Phase I and Phase II projects that emphasize one of NASA Glenn Research Center's six core competencies-Materials and Structures for Extreme Environments. The technologies cover a wide spectrum of applications such as high temperature environmental barrier coating systems, deployable space structures, solid oxide fuel cells, and self-lubricating hard coatings for extreme temperatures. Each featured technology describes an innovation, technical objective, and highlights NASA commercial and industrial applications. This report provides an opportunity for NASA engineers, researchers, and program managers to learn how NASA SBIR technologies could help their programs and projects, and lead to collaborations and partnerships between the small SBIR companies and NASA that would benefit both.

  13. The Phase II ATLAS ITk Pixel Upgrade

    CERN Document Server

    Terzo, Stefano; The ATLAS collaboration

    2017-01-01

    The entire tracking system of the ATLAS experiment will be replaced during the LHC Phase II shutdown (foreseen to take place around 2025) by an all-silicon detector called the "ITk" (Inner Tracker). The innermost portion of ITk will consist of a pixel detector with five layers in the barrel region and and ring-shaped supports in the endcap regions. It will be instrumented with new sensor and readout electronics technologies to improve the tracking performance and cope with the HL-LHC environment, which will be severe in terms of occupancy and radiation. The total surface area of silicon in the new pixel system could measure up to 14 m$^2$ , depending on the final layout choice, which is expected to take place in early 2017. Several layout options are being investigated at the moment, including some with novel inclined support structures in the barrel-endcap overlap region and others with very long innermost barrel layers. Forward coverage could be as high as $|\\eta| < 4$. Supporting structures will be ...

  14. Phase II Final Scientific/Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Grigg, Reid; McPherson, Brian; Lee, Rober

    2011-08-01

    The Southwest Regional Partnership on Carbon Sequestration (SWP) one of seven regional partnerships sponsored by the U.S. Department of Energy (USDOE) carried out five field pilot tests in its Phase II Carbon Sequestration Demonstration effort, to validate the most promising sequestration technologies and infrastructure concepts, including three geologic pilot tests and two terrestrial pilot programs. This field testing demonstrated the efficacy of proposed sequestration technologies to reduce or offset greenhouse gas emissions in the region. Risk mitigation, optimization of monitoring, verification, and accounting (MVA) protocols, and effective outreach and communication were additional critical goals of these field validation tests. The program included geologic pilot tests located in Utah, New Mexico, Texas, and a region-wide terrestrial analysis. Each geologic sequestration test site was intended to include injection of a minimum of ~75,000 tons/year CO{sub 2}, with minimum injection duration of one year. These pilots represent medium- scale validation tests in sinks that host capacity for possible larger-scale sequestration operations in the future. These validation tests also demonstrated a broad variety of carbon sink targets and multiple value-added benefits, including testing of enhanced oil recovery and sequestration, enhanced coalbed methane production and a geologic sequestration test combined with a local terrestrial sequestration pilot. A regional terrestrial sequestration demonstration was also carried out, with a focus on improved terrestrial MVA methods and reporting approaches specific for the Southwest region.

  15. Design of Phase II Non-inferiority Trials.

    Science.gov (United States)

    Jung, Sin-Ho

    2017-09-01

    With the development of inexpensive treatment regimens and less invasive surgical procedures, we are confronted with non-inferiority study objectives. A non-inferiority phase III trial requires a roughly four times larger sample size than that of a similar standard superiority trial. Because of the large required sample size, we often face feasibility issues to open a non-inferiority trial. Furthermore, due to lack of phase II non-inferiority trial design methods, we do not have an opportunity to investigate the efficacy of the experimental therapy through a phase II trial. As a result, we often fail to open a non-inferiority phase III trial and a large number of non-inferiority clinical questions still remain unanswered. In this paper, we want to develop some designs for non-inferiority randomized phase II trials with feasible sample sizes. At first, we review a design method for non-inferiority phase III trials. Subsequently, we propose three different designs for non-inferiority phase II trials that can be used under different settings. Each method is demonstrated with examples. Each of the proposed design methods is shown to require a reasonable sample size for non-inferiority phase II trials. The three different non-inferiority phase II trial designs are used under different settings, but require similar sample sizes that are typical for phase II trials.

  16. 40 CFR 73.20 - Phase II early reduction credits.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Phase II early reduction credits. 73.20 Section 73.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) SULFUR DIOXIDE ALLOWANCE SYSTEM Allowance Allocations § 73.20 Phase II early reduction credits...

  17. Emission projections 2008-2012 versus national allocation plans II

    International Nuclear Information System (INIS)

    Neuhoff, Karsten; Ferrario, Federico; Grubb, Michael; Gabel, Etienne; Keats, Kim

    2006-01-01

    We compare the national allocation plans (NAPs), proposed and submitted by EU Member States as of October 2006, with our estimations for CO 2 emissions by the installations covered by these NAPs. The collective allocations proposed under phase II NAPs exceed the historic trend of emissions extrapolated forward. Using our projections we find, depending on uncertainty in fuel prices, economic growth rates, performance of the non-power sector and CDM/JI availability, a 15% chance of a 'dead market' with emissions below cap even at zero prices. With an expected inflow of committed CDM/JI credits of 100 MtCO 2 /year, allowance supply will exceed demand in 50% of cases without any carbon price, and in 80% of our euros20/tCO 2 scenarios. Banking of allowances towards post-2012 conditions could create additional demand, but this is difficult to anticipate and conditional on policy evolution. The proposed phase II NAPs would result in low prices and only small volumes of CDM/JI would enter the EU ETS. CDM/JI would almost exclusively be public-sector funded, placing the cost of Kyoto compliance entirely upon governments. (Author)

  18. Kilowatt isotope power system. Phase II plan. Volume I. Phase II program plan

    International Nuclear Information System (INIS)

    1978-01-01

    The development of a Kilowatt Isotope Power System (KIPS) was begun in 1975 for the purpose of satisfying the power requirements of satellites in the 1980's. The KIPS is a 238 PuO 2 -fueled organic Rankine cycle turbine power system to provide a design output of 500 to 2000 W. Phase II of the overall 3-phase KIPS program is described. This volume presents a program plan for qualifying the organic Rankine power system for flight test in 1982. The program plan calls for the design and fabrication of the proposed flight power system; conducting a development and a qualification program including both environmental and endurance testing, using an electrical and a radioisotope heat source; planning for flight test and spacecraft integration; and continuing ground demonstration system testing to act as a flight system breadboard and to accumulate life data

  19. IDC Reengineering Phase 2 Project Scope.

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-02-01

    This report provides a brief description of the scope of the IDC Reengineering Phase 2 project. It describes the goals and objectives of reengineering, the system definition, and the technical scope of the system. REVISIONS Version Date Author/Team Revision Description Authorized by 1.0 9/25/2014 SNL IDC Reengineering Team Unlimited Release for I2 M. Harris 1.1 28/01/2015 IDC Reengineering Team Align with previous IDC scope document E. Tomuta.

  20. A Fire Safety Certification System for Board and Care Operators and Staff. SBIR Phase II: Final Report.

    Science.gov (United States)

    Walker, Bonnie L.

    This report describes Phase II of a project which developed a system for delivering fire safety training to board and care providers who serve adults with developmental disabilities. Phase II focused on developing and pilot testing a "train the trainers" workshop for instructors and field testing the provider's workshop. Evaluation of…

  1. Projected phase-change memory devices.

    Science.gov (United States)

    Koelmans, Wabe W; Sebastian, Abu; Jonnalagadda, Vara Prasad; Krebs, Daniel; Dellmann, Laurent; Eleftheriou, Evangelos

    2015-09-03

    Nanoscale memory devices, whose resistance depends on the history of the electric signals applied, could become critical building blocks in new computing paradigms, such as brain-inspired computing and memcomputing. However, there are key challenges to overcome, such as the high programming power required, noise and resistance drift. Here, to address these, we present the concept of a projected memory device, whose distinguishing feature is that the physical mechanism of resistance storage is decoupled from the information-retrieval process. We designed and fabricated projected memory devices based on the phase-change storage mechanism and convincingly demonstrate the concept through detailed experimentation, supported by extensive modelling and finite-element simulations. The projected memory devices exhibit remarkably low drift and excellent noise performance. We also demonstrate active control and customization of the programming characteristics of the device that reliably realize a multitude of resistance states.

  2. RadSTraM: Radiological Source Tracking and Monitoring, Phase II Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Warren, Tracy A [ORNL; Walker, Randy M [ORNL; Hill, David E [ORNL; Gross, Ian G [ORNL; Smith, Cyrus M [ORNL; Abercrombie, Robert K [ORNL

    2008-12-01

    This report focuses on the technical information gained from the Radiological Source Tracking and Monitoring (RadSTraM) Phase II investigation and its implications. The intent of the RadSTraM project was to determine the feasibility of tracking radioactive materials in commerce, particularly International Atomic Energy Agency (IAEA) Category 3 and 4 materials. Specifically, Phase II of the project addressed tracking radiological medical isotopes in commerce. These categories of materials are susceptible to loss or theft but the problem is not being addressed by other agencies.

  3. RadSTraM: Radiological Source Tracking and Monitoring, Phase II Final Report

    International Nuclear Information System (INIS)

    Warren, Tracy A.; Walker, Randy M.; Hill, David E.; Gross, Ian G.; Smith, Cyrus M.; Abercrombie, Robert K.

    2008-01-01

    This report focuses on the technical information gained from the Radiological Source Tracking and Monitoring (RadSTraM) Phase II investigation and its implications. The intent of the RadSTraM project was to determine the feasibility of tracking radioactive materials in commerce, particularly International Atomic Energy Agency (IAEA) Category 3 and 4 materials. Specifically, Phase II of the project addressed tracking radiological medical isotopes in commerce. These categories of materials are susceptible to loss or theft but the problem is not being addressed by other agencies

  4. Durability of lightweight concrete : Phase II : wetting and drying tests, Phase III : freezing and thawing tests.

    Science.gov (United States)

    1966-12-01

    This report describes a laboratory research program on the durability of lightweight concrete. Two phases of a three phase study are covered by this report, while the remaining phase is still under study. The two phases being reported are Phase II - ...

  5. Impact of National Fadama Development Project II on Rice farmers ...

    African Journals Online (AJOL)

    ... examined the impact of National Fadama Development Project II on the profitability of rice farmers and assessed the extent to which the various innovations disseminated by the project were adopted by the rice farmer beneficiaries. The project which had all operating expenses cofinanced by the various key stakeholders ...

  6. Physical Improvements in Exciter/Igniter Units, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed Phase 2 project consists of the physical integration of our Phase 1 small, compact exciter with a "flight like" igniter or spark plug capable of...

  7. Lifts of projective congruence groups, II

    DEFF Research Database (Denmark)

    Kiming, Ian

    2014-01-01

    We continue and complete our previous paper ``Lifts of projective congruence groups'' concerning the question of whether there exist noncongruence subgroups of  that are projectively equivalent to one of the groups  or . A complete answer to this question is obtained: In case of  such noncongruence...

  8. Process-Hardened, Multi-Analyte Sensor for Characterizing Rocket Plum Constituents Under Test Environment, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of the Phase II STTR project is to develop a prototype multi-analyte sensor system to detect gaseous analytes present in the test stands during...

  9. Bragg projection ptychography on niobium phase domains

    Science.gov (United States)

    Burdet, Nicolas; Shi, Xiaowen; Clark, Jesse N.; Huang, Xiaojing; Harder, Ross; Robinson, Ian

    2017-07-01

    Bragg projection ptychography (BPP) is a coherent x-ray diffraction imaging technique which combines the strengths of scanning microscopy with the phase contrast of x-ray ptychography. Here we apply it for high resolution imaging of the phase-shifted crystalline domains associated with epitaxial growth. The advantages of BPP are that the spatial extent of the sample is arbitrary, it is nondestructive, and it gives potentially diffraction limited spatial resolution. Here we demonstrate the application of BPP for revealing the domain structure caused by epitaxial misfit in a nanostructured metallic thin film. Experimental coherent diffraction data were collected from a niobium thin film, epitaxially grown on a sapphire substrate as the beam was scanned across the sample. The data were analyzed by BPP using a carefully selected combination of refinement procedures. The resulting image shows a close packed array of epitaxial domains, shifted with respect to each other due to misfit between the film and its substrate.

  10. Instrument for Airborne Measurement of Carbonyl Sulfide, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — In this Phase II SBIR program, Southwest Sciences will continue the development of small, low power instrumentation for real-time direct measurement of carbonyl...

  11. Advanced Technology Cloud Particle Probe for UAS, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — In Phase II SPEC will design, fabricate and flight test a state-of-the-art combined cloud particle probe called the Hawkeye. Hawkeye is the culmination of two...

  12. Novel Instrumentation for Rocket Propulsion Systems, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of the proposed SBIR Phase II program is to develop, deploy and deliver novel laser-based instruments that provide rapid, in situ, simultaneous...

  13. Space-Ready Advanced Imaging System, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — In this Phase II effort Toyon will increase the state-of-the-art for video/image systems. This will include digital image compression algorithms as well as system...

  14. Lightweight Metal RubberTM Sensors and Interconnects, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of this NASA Phase II program is to develop and increase the Technology Readiness Level of multifunctional Metal RubberTM (MRTM) materials that can be...

  15. Shape Memory Alloy-Based Periodic Cellular Structures, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — This SBIR Phase II effort will continue to develop and demonstrate an innovative shape memory alloy (SMA) periodic cellular structural technology. Periodic cellular...

  16. Ground Processing Optimization Using Artificial Intelligence Techniques, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The ultimate goal is the automation of a large amount of KSC's planning, scheduling, and execution decision making. Phase II will result in a complete full-scale...

  17. Diagnosis-Driven Prognosis for Decision Making, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — In Phase II, the QSI-Vanderbilt team seeks to develop a system-level diagnostics and prognostic process that incorporates a "sense and respond capability," which...

  18. Compact, High Accuracy CO2 Monitor, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — This Small Business Innovative Research Phase II proposal seeks to develop a low cost, robust, highly precise and accurate CO2 monitoring system. This system will...

  19. UltraSail Solar Sail Flight Experiment, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — A team of CU Aerospace, the University of Illinois, and ManTech SRS Technologies proposes Phase II development of a 3 kg CubeSat spacecraft for initial flight test...

  20. A Nanodroplet Processor for Advanced Microencapsulated Drug Formulations, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — During this Phase II program we propose to build on the key aspects of the nanodroplet encapsulation technology to demonstrate optimized formulation and...

  1. Multi-Channel Tunable Source for Atomic Sensors, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — This Phase II SBIR will seek to develop a prototype laser source suitable for atomic interferometry from compact, robust, integrated components. AdvR's design is...

  2. Cash Impact of the Consumable Item Transfer, Phase II

    National Research Council Canada - National Science Library

    1998-01-01

    ...). This report is the third in a series of reports regarding the consumable item transfer (CIT), phase II. The Deputy Secretary of Defense directed the transfer of the management of consumable items to Defense Logistics Agency...

  3. LHC related projects and studies - Part (II)

    International Nuclear Information System (INIS)

    Rossi, L.; De Maria, R.

    2012-01-01

    The session was devoted to address some aspects of the HL-LHC (High Luminosity LHC) project and explore ideas on new machines for the long term future. The session had two parts. The former focused on some of the key issues of the HL-LHC projects: beam current limits, evolution of the collimation system, research plans for the interaction region magnets and crab cavities. The latter explored the ideas for the long term future projects (LHeC and HE-LHC) and how the current research-development program for magnets and RF structures could fit in the envisaged scenarios

  4. Barriers to participation in a phase II cardiac rehabilitation programme.

    Science.gov (United States)

    Mak, Y M W; Chan, W K; Yue, C S S

    2005-12-01

    To identify barriers to participation in a phase II cardiac rehabilitation programme and measures that may enhance participation. Prospective study. Regional hospital, Hong Kong. Cardiac patients recruited for a phase I cardiac rehabilitation programme from July 2002 to January 2003. Reasons for not participating in a phase II cardiac rehabilitation programme. Of the 193 patients recruited for a phase I cardiac rehabilitation programme, 152 (79%) patients, with a mean age of 70.3 years (standard deviation, 11.9 years), did not proceed to phase II programme. Eleven (7%) deaths occurred before commencement of phase II and 74 (49%) patients were considered physically unfit. Reasons for the latter included fractures, pain, or degenerative changes in the lower limbs (24%), and co-morbidities such as cerebrovascular accident (19%), chronic renal failure (11%), congestive heart failure (9%), and unstable angina (8%). Phase II rehabilitation was postponed until after completion of scheduled cardiac interventions in 13% of patients. Failure of physicians to arrange the pre-phase II exercise stress test as per protocol was reported in 7% of patients. Other reasons were reported: work or time conflicts (16%), non-compliance with cardiac treatment (5%), financial constraints (4%), self-exercise (3%), fear after exercise stress testing (3%), and patients returning to their original cardiologists for treatment (3%). A significant (79%) proportion of patients did not proceed to a phase II cardiac rehabilitation programme for a variety of reasons. These included physical unfitness, work or time conflicts, and need to attend scheduled cardiac interventions. Further studies are required to determine how to overcome obstacles to cardiac rehabilitation.

  5. Miniature Active Space Radiation Dosimeter, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Space Micro will extend our Phase I R&D to develop a family of miniature, active space radiation dosimeters/particle counters, with a focus on biological/manned...

  6. Longwave Imaging for Astronomical Applications, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — We propose to develop a compact portable longwave camera for astronomical applications. In Phase 1, we successfully developed the eye of the camera, i.e. the focal...

  7. On-Demand Urine Analyzer, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The overall goal of this program (through Phase III) is to develop an analyzer that can be integrated into International Space Station (ISS) toilets to measure key...

  8. Optical Landing Hazard Sensor, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Visidyne's Phase I effort has established through modeling and analysis that a unique concept for an active optical 3-D Imager (or Imaging LADAR) has high potential...

  9. Integrated Multidisciplinary Optimization Objects, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — During Phase I, M4 Engineering integrated a prototype system into OpenMDAO, a NASA GRC open-source framework. This prototype system was a proof-of-concept that M4...

  10. Virtual Sensor Test Instrumentation, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Mobitrum has started the development of virtual sensor test instrumentation in Phase I for characterization and measurement of ground testing of propulsion systems....

  11. Software Defined Multiband EVA Radio, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of Phase 2 is to build a reliable, lightweight, programmable, multi-mode, miniaturized EVA Software Defined Radio (SDR) that supports data telemetry,...

  12. Tactile Data Entry System, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Building on our successful Phase I Tactile Data Entry program, Barron Associates proposes development of a Glove-Enabled Computer Operations (GECO) system to permit...

  13. Upgrade for Phase II of the Gerda experiment

    Science.gov (United States)

    Agostini, M.; Bakalyarov, A. M.; Balata, M.; Barabanov, I.; Baudis, L.; Bauer, C.; Bellotti, E.; Belogurov, S.; Belyaev, S. T.; Benato, G.; Bettini, A.; Bezrukov, L.; Bode, T.; Borowicz, D.; Brudanin, V.; Brugnera, R.; Caldwell, A.; Cattadori, C.; Chernogorov, A.; D'Andrea, V.; Demidova, E. V.; Di Marco, N.; Domula, A.; Doroshkevich, E.; Egorov, V.; Falkenstein, R.; Frodyma, N.; Gangapshev, A.; Garfagnini, A.; Grabmayr, P.; Gurentsov, V.; Gusev, K.; Hakenmüller, J.; Hegai, A.; Heisel, M.; Hemmer, S.; Hiller, R.; Hofmann, W.; Hult, M.; Inzhechik, L. V.; Ioannucci, L.; Janicskó Csáthy, J.; Jochum, J.; Junker, M.; Kazalov, V.; Kermaïdic, Y.; Kihm, T.; Kirpichnikov, I. V.; Kirsch, A.; Kish, A.; Klimenko, A.; Kneißl, R.; Knöpfle, K. T.; Kochetov, O.; Kornoukhov, V. N.; Kuzminov, V. V.; Laubenstein, M.; Lazzaro, A.; Lebedev, V. I.; Lehnert, B.; Lindner, M.; Lippi, I.; Lubashevskiy, A.; Lubsandorzhiev, B.; Lutter, G.; Macolino, C.; Majorovits, B.; Maneschg, W.; Medinaceli, E.; Miloradovic, M.; Mingazheva, R.; Misiaszek, M.; Moseev, P.; Nemchenok, I.; Nisi, S.; Panas, K.; Pandola, L.; Pelczar, K.; Pullia, A.; Ransom, C.; Riboldi, S.; Rumyantseva, N.; Sada, C.; Salamida, F.; Salathe, M.; Schmitt, C.; Schneider, B.; Schönert, S.; Schreiner, J.; Schütz, A.-K.; Schulz, O.; Schwingenheuer, B.; Selivanenko, O.; Shevchik, E.; Shirchenko, M.; Simgen, H.; Smolnikov, A.; Stanco, L.; Vanhoefer, L.; Vasenko, A. A.; Veresnikova, A.; von Sturm, K.; Wagner, V.; Wegmann, A.; Wester, T.; Wiesinger, C.; Wojcik, M.; Yanovich, E.; Zhitnikov, I.; Zhukov, S. V.; Zinatulina, D.; Zsigmond, A. J.; Zuber, K.; Zuzel, G.

    2018-05-01

    The Gerda collaboration is performing a sensitive search for neutrinoless double beta decay of ^{76}Ge at the INFN Laboratori Nazionali del Gran Sasso, Italy. The upgrade of the Gerda experiment from Phase I to Phase II has been concluded in December 2015. The first Phase II data release shows that the goal to suppress the background by one order of magnitude compared to Phase I has been achieved. Gerda is thus the first experiment that will remain "background-free" up to its design exposure (100 kg year). It will reach thereby a half-life sensitivity of more than 10^{26} year within 3 years of data collection. This paper describes in detail the modifications and improvements of the experimental setup for Phase II and discusses the performance of individual detector components.

  14. Design of clinical trials Phase I and II with radiopharmaceuticals

    International Nuclear Information System (INIS)

    Giannone, C.A.; Soroa, V.E.

    2015-01-01

    We presented some usual designs for clinical studies in Phase I and Phase II. For Phase I we considered the 3 + 3 Classic design, designs with accelerated titration and those with dose escalation schemes with overdose control (EWOC). For Phase II designs with efficacy outcomes are presented. The design proposed by Fleming is discussed as well as those with inclusion of patients in two stages: Gehan’s design and the Optimal two–stage Simon’s design. We also discussed the design of combined endpoints of efficacy and safety of Bryant and Day with an application example of therapeutically Lu-177. Finally some proposals for phase II trials with control group are considered. (authors) [es

  15. Electronic construction collaboration system -- phase II.

    Science.gov (United States)

    2010-06-01

    During the first year of research, work was completed to identify Iowa DOT needs for web-based project management system (WPMS) : and evaluate how commercially available solutions could meet these needs. Researchers also worked to pilot test custom d...

  16. Compact Energy Conversion Module, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — This STTR project delivers a compact vibration-based Energy Conversion Module (ECM) that powers sensors for purposes such as structural health monitoring (SHM). NASA...

  17. Automated NDE Flaw Mapping System, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — NASA's Aircraft Aging and Durability Project (AADP) aims to ensure the safety of both commercial and military aviation aircraft. Non-destructive evaluation (NDE)...

  18. Concept of Operations Storyboarding Tool, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The purpose of this project is to develop a storyboard tool to assist with the generation, verification, and refinement of storyboard information and its subsequent...

  19. Remote UV Fluorescence Lifetime Spectrometer, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The goal of this project is to develop, demonstrate, and deliver to NASA an innovative, portable, and power efficient Remote UV Fluorescence Lifetime Spectrometer...

  20. Phase II Vault Testing of the Argonne RFID System

    International Nuclear Information System (INIS)

    Willoner, T.; Turlington, R.; Koenig, R.

    2012-01-01

    The U.S. Department of Energy (DOE) (Environmental Management (EM), Office of Packaging and Transportation (EM-45)) Packaging and Certification Program (DOE PCP) has developed a Radio Frequency Identification (RFID) tracking and monitoring system, called ARG-US, for the management of nuclear materials packages during transportation and storage. The performance of the ARG-US RFID equipment and system has been fully tested in two demonstration projects in April 2008 and August 2009. With the strong support of DOE-SR and DOE PCP, a field testing program was completed in Savannah River Site's K-Area Material Storage (KAMS) Facility, an active Category I Plutonium Storage Facility, in 2010. As the next step (Phase II) of continued vault testing for the ARG-US system, the Savannah River Site K Area Material Storage facility has placed the ARG-US RFIDs into the 910B storage vault for operational testing. This latest version (Mark III) of the Argonne RFID system now has the capability to measure radiation dose and dose rate. This paper will report field testing progress of the ARG-US RFID equipment in KAMS, the operability and reliability trend results associated with the applications of the system, and discuss the potential benefits in enhancing safety, security and materials accountability. The purpose of this Phase II K Area test is to verify the accuracy of the radiation monitoring and proper functionality of the ARG-US RFID equipment and system under a realistic environment in the KAMS facility. Deploying the ARG-US RFID system leads to a reduced need for manned surveillance and increased inventory periods by providing real-time access to status and event history traceability, including environmental condition monitoring and radiation monitoring. The successful completion of the testing program will provide field data to support a future development and testing. This will increase Operation efficiency and cost effectiveness for vault operation. As the next step (Phase

  1. PHASE II VAULT TESTING OF THE ARGONNE RFID SYSTEM

    Energy Technology Data Exchange (ETDEWEB)

    Willoner, T.; Turlington, R.; Koenig, R.

    2012-06-25

    The U.S. Department of Energy (DOE) (Environmental Management [EM], Office of Packaging and Transportation [EM-45]) Packaging and Certification Program (DOE PCP) has developed a Radio Frequency Identification (RFID) tracking and monitoring system, called ARG-US, for the management of nuclear materials packages during transportation and storage. The performance of the ARG-US RFID equipment and system has been fully tested in two demonstration projects in April 2008 and August 2009. With the strong support of DOE-SR and DOE PCP, a field testing program was completed in Savannah River Site's K-Area Material Storage (KAMS) Facility, an active Category I Plutonium Storage Facility, in 2010. As the next step (Phase II) of continued vault testing for the ARG-US system, the Savannah River Site K Area Material Storage facility has placed the ARG-US RFIDs into the 910B storage vault for operational testing. This latest version (Mark III) of the Argonne RFID system now has the capability to measure radiation dose and dose rate. This paper will report field testing progress of the ARG-US RFID equipment in KAMS, the operability and reliability trend results associated with the applications of the system, and discuss the potential benefits in enhancing safety, security and materials accountability. The purpose of this Phase II K Area test is to verify the accuracy of the radiation monitoring and proper functionality of the ARG-US RFID equipment and system under a realistic environment in the KAMS facility. Deploying the ARG-US RFID system leads to a reduced need for manned surveillance and increased inventory periods by providing real-time access to status and event history traceability, including environmental condition monitoring and radiation monitoring. The successful completion of the testing program will provide field data to support a future development and testing. This will increase Operation efficiency and cost effectiveness for vault operation. As the next step

  2. Rooftop PV system. Final technical progress report, Phase II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    Under this four-year PV:BONUS Program, ECD and United Solar are developing and demonstrating two new lightweight flexible building integrated Photovoltaic (BIPV) modules specifically designed as exact replacements for conventional asphalt shingles and standing seam metal roofing. These modules can be economically and aesthetically integrated into new residential and commercial buildings, and address the even larger roofing replacement market. The modules are designed to be installed by roofing contractors without special training which minimizes the installation and balance of system costs. The modules will be fabricated from high-efficiency, multiple-junction a-Si alloy solar cells developed by ECD and United Solar. Under the Phase I Program, which ended in March 1994, we developed two different concept designs for rooftop PV modules: (1) the United Solar overlapping (asphalt shingle replacement) shingle-type modules and (2) the ECD metal roof-type modules. We also developed a plan for fabricating, testing and demonstrating these modules. Candidate demonstration sites for our rooftop PV modules were identified and preliminary engineering designs for these demonstrations were developed; a marketing study plan was also developed. The major objectives of the Phase II Program, which started in June 1994 was (1) to develop, test, and qualify these new rooftop modules; (2) to develop mechanical and electrical engineering specifications for the demonstration projects; and (3) to develop a marketing/commercialization plan.

  3. Brain Oxygen Optimization in Severe Traumatic Brain Injury Phase-II: A Phase II Randomized Trial.

    Science.gov (United States)

    Okonkwo, David O; Shutter, Lori A; Moore, Carol; Temkin, Nancy R; Puccio, Ava M; Madden, Christopher J; Andaluz, Norberto; Chesnut, Randall M; Bullock, M Ross; Grant, Gerald A; McGregor, John; Weaver, Michael; Jallo, Jack; LeRoux, Peter D; Moberg, Dick; Barber, Jason; Lazaridis, Christos; Diaz-Arrastia, Ramon R

    2017-11-01

    A relationship between reduced brain tissue oxygenation and poor outcome following severe traumatic brain injury has been reported in observational studies. We designed a Phase II trial to assess whether a neurocritical care management protocol could improve brain tissue oxygenation levels in patients with severe traumatic brain injury and the feasibility of a Phase III efficacy study. Randomized prospective clinical trial. Ten ICUs in the United States. One hundred nineteen severe traumatic brain injury patients. Patients were randomized to treatment protocol based on intracranial pressure plus brain tissue oxygenation monitoring versus intracranial pressure monitoring alone. Brain tissue oxygenation data were recorded in the intracranial pressure -only group in blinded fashion. Tiered interventions in each arm were specified and impact on intracranial pressure and brain tissue oxygenation measured. Monitors were removed if values were normal for 48 hours consecutively, or after 5 days. Outcome was measured at 6 months using the Glasgow Outcome Scale-Extended. A management protocol based on brain tissue oxygenation and intracranial pressure monitoring reduced the proportion of time with brain tissue hypoxia after severe traumatic brain injury (0.45 in intracranial pressure-only group and 0.16 in intracranial pressure plus brain tissue oxygenation group; p injury after severe traumatic brain injury based on brain tissue oxygenation and intracranial pressure values was consistent with reduced mortality and increased proportions of patients with good recovery compared with intracranial pressure-only management; however, the study was not powered for clinical efficacy. Management of severe traumatic brain injury informed by multimodal intracranial pressure and brain tissue oxygenation monitoring reduced brain tissue hypoxia with a trend toward lower mortality and more favorable outcomes than intracranial pressure-only treatment. A Phase III randomized trial to assess

  4. VTAE Equity Staff Development Workshops and Services--Phase II. Final Report.

    Science.gov (United States)

    Baldus, Lorayne; Nelson, Orville

    The Phase II Equity Staff Development project was revised in response to a need to develop an equity strategic planning model with a vision statement, goals, and objectives. The Equity Strategic Planning Model was presented to administrators of Wisconsin Vocational, Technical, and Adult Education (VTAE) colleges for their use in district strategic…

  5. Advanced Simulation Capability for Environmental Management (ASCEM) Phase II Demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Freshley, M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hubbard, S. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Flach, G. [Savannah River National Lab. (SRNL), Aiken, SC (United States); Freedman, V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Agarwal, D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Andre, B. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Bott, Y. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Chen, X. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Davis, J. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Faybishenko, B. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Gorton, I. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Murray, C. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Moulton, D. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Meyer, J. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Rockhold, M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Shoshani, A. [LBNL; Steefel, C. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Wainwright, H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Waichler, S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2012-09-28

    quality assurance. The Platform and HPC capabilities are being tested and evaluated for EM applications through a suite of demonstrations being conducted by the Site Applications Thrust. In 2010, the Phase I Demonstration focused on testing initial ASCEM capabilities. The Phase II Demonstration, completed in September 2012, focused on showcasing integrated ASCEM capabilities. For Phase II, the Hanford Site Deep Vadose Zone (BC Cribs) served as an application site for an end-to-end demonstration of ASCEM capabilities on a site with relatively sparse data, with emphasis on integration and linkages between the Platform and HPC components. Other demonstrations included in this Phase II report included addressing attenuation-based remedies at the Savannah River Site F-Area, to exercise linked ASCEM components under data-dense and complex geochemical conditions, and conducting detailed simulations of a representative waste tank. This report includes descriptive examples developed by the Hanford Site Deep Vadose Zone, the SRS F-Area Attenuation-Based Remedies for the Subsurface, and the Waste Tank Performance Assessment working groups. The integrated Phase II Demonstration provides test cases to accompany distribution of the initial user release (Version 1.0) of the ASCEM software tools to a limited set of users in 2013. These test cases will be expanded with each new release, leading up to the release of a version that is qualified for regulatory applications in the 2015 time frame.

  6. Project profile of CRYSTL: Phase I and Phase II

    International Nuclear Information System (INIS)

    1985-04-01

    The US Department of Energy (DOE) plans to locate one high-level nuclear waste repository in the eastern United States by the year 2000. Current plans call for this repository to be located in crystalline rock formations. North Carolina is one of seventeen states with crystalline rock bodies that are under study. DOE is evaluating the geological aspects of the rock bodies as well as the impact a repository will have on the natural and cultural resources of the area. Funds have been granted to North Carolina from DOE to allow the state to review DOE's findings. A portion of these funds have been used to build digital geographic datasets that are being used for this evaluation and review. This report summarizes the data collected and methods used in entering them into the computer

  7. EBR-II and TREAT Digitization Project

    Energy Technology Data Exchange (ETDEWEB)

    Griffith, George W. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Rabiti, Cristian [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-09-01

    Digitizing the technical drawings for EBR-II and TREAT provides multiple benefits. Moving the scanned or hard copy drawings to modern 3-D CAD (Computer Aided Drawing) format saves data that could be lost over time. The 3-D drawings produce models that can interface with other drawings to make complex assemblies. The 3-D CAD format can also include detailed material properties and parametric coding that can tie critical dimensions together allowing easier modification. Creating the new files from the old drawings has found multiple inconsistencies that are being flagged or corrected improving understanding of the reactor(s).

  8. EBR-II and TREAT Digitization Project

    International Nuclear Information System (INIS)

    Griffith, George W.; Rabiti, Cristian

    2015-01-01

    Digitizing the technical drawings for EBR-II and TREAT provides multiple benefits. Moving the scanned or hard copy drawings to modern 3-D CAD (Computer Aided Drawing) format saves data that could be lost over time. The 3-D drawings produce models that can interface with other drawings to make complex assemblies. The 3-D CAD format can also include detailed material properties and parametric coding that can tie critical dimensions together allowing easier modification. Creating the new files from the old drawings has found multiple inconsistencies that are being flagged or corrected improving understanding of the reactor(s).

  9. Status of the DESY II project

    International Nuclear Information System (INIS)

    Hemmie, G.

    1987-01-01

    DESY II has been extensively tested at low magnet current excitations corresponding to 1 GeV maximum energy. After the old DESY I synchrotron was turned off in Nov. 86 the provisional power supplies were replaced by magnet- and rf-power supplies of full 8 GeV rating. All external beam lines have now been connected to the new machine. Some modifications on components are described. A report on the results from the initial tests of the machine under full power conditions is given

  10. Performance of the LAr scintillation veto of Gerda Phase II

    Energy Technology Data Exchange (ETDEWEB)

    Wiesinger, Christoph [Physik-Department and Excellence Cluster Universe, Technische Universitaet Muenchen, James-Franck-Strasse, 85748 Garching (Germany); Collaboration: GERDA-Collaboration

    2016-07-01

    Gerda is an experiment to search for the neutrinoless double beta decay in {sup 76}Ge. Results of Phase I have been published in summer 2013 and Gerda has been upgraded to Phase II. To reach the aspired background index of ∝10{sup -3} cts/(keV.kg.yr) for Phase II active background-suppression techniques are applied, including an active liquid argon (LAr) veto. It has been demonstrated with the LArGe test facility that the detection of argon scintillation light can be used to effectively suppress background events in the germanium detectors, which simultaneously deposit energy in the LAr. The light instrumentation consisting of photomultiplier tubes (PMT) and wavelength-shifting fibers connected to silicon photomultipliers (SiPM) has been installed in Gerda. In this talk the low background design of the LAr veto and its performance during Phase II start-up is reported.

  11. Irradiation of reactor materials within projects VISA-2 and 3, 3. Procedure for construction and testing the capsules and test-tubes - Phase I (Parts I and II) Part II; Ozracivanje reaktorskih materijala po projektima VISA-2 i 3, 3. Osvajanje postupka izrade i ispitivanja kapsula i kenera VISA - I faza (I i II deo), II deo

    Energy Technology Data Exchange (ETDEWEB)

    Pavicevic, M [Institute of Nuclear Sciences Boris Kidric, Vinca, Beograd (Serbia and Montenegro)

    1964-02-15

    Experiments concerned with Projects VISA-2 and 3 demand construction of hermetization test-tubes, irradiation capsules, experimental devices and reactor channels as well as welding of fuel element claddings. For this purpose special materials as stainless steels, aluminium alloys, pure aluminium, magnesium, zirconium were chosen. these materials demand special procedure for welding. This report includes design and construction data with drawings of the special device for semiautomated circular welding.

  12. Blade System Design Study. Part II, final project report (GEC).

    Energy Technology Data Exchange (ETDEWEB)

    Griffin, Dayton A. (DNV Global Energy Concepts Inc., Seattle, WA)

    2009-05-01

    As part of the U.S. Department of Energy's Low Wind Speed Turbine program, Global Energy Concepts LLC (GEC)1 has studied alternative composite materials for wind turbine blades in the multi-megawatt size range. This work in one of the Blade System Design Studies (BSDS) funded through Sandia National Laboratories. The BSDS program was conducted in two phases. In the Part I BSDS, GEC assessed candidate innovations in composite materials, manufacturing processes, and structural configurations. GEC also made recommendations for testing composite coupons, details, assemblies, and blade substructures to be carried out in the Part II study (BSDS-II). The BSDS-II contract period began in May 2003, and testing was initiated in June 2004. The current report summarizes the results from the BSDS-II test program. Composite materials evaluated include carbon fiber in both pre-impregnated and vacuum-assisted resin transfer molding (VARTM) forms. Initial thin-coupon static testing included a wide range of parameters, including variation in manufacturer, fiber tow size, fabric architecture, and resin type. A smaller set of these materials and process types was also evaluated in thin-coupon fatigue testing, and in ply-drop and ply-transition panels. The majority of materials used epoxy resin, with vinyl ester (VE) resin also used for selected cases. Late in the project, testing of unidirectional fiberglass was added to provide an updated baseline against which to evaluate the carbon material performance. Numerous unidirectional carbon fabrics were considered for evaluation with VARTM infusion. All but one fabric style considered suffered either from poor infusibility or waviness of fibers combined with poor compaction. The exception was a triaxial carbon-fiberglass fabric produced by SAERTEX. This fabric became the primary choice for infused articles throughout the test program. The generally positive results obtained in this program for the SAERTEX material have led to its

  13. Ultrasonic Communication Project, Phase 1, FY1999

    Energy Technology Data Exchange (ETDEWEB)

    Haynes, H.D.; Akerman, M.A.; Baylor, V.M.

    2000-06-01

    This Phase 1 project has been successful in identifying, exploring, and demonstrating methods for ultrasonic-based communication with an emphasis on the application of digital signal processing techniques. During the project, at the direction of the agency project monitor, particular attention was directed at sending and receiving ultrasonic data through air and through pipes that would be commonly found in buildings. Efforts were also focused on development of a method for transmitting computer files ultrasonically. New methods were identified and evaluated for ultrasonic communication. These methods are based on a technique called DFS. With DFS, individual alphanumeric characters are broken down into a sequence of bits, and each bit is used to generate a discrete ultrasonic frequency. Characters are then transmitted one-bit-at-a-time, and reconstructed by the receiver. This technique was put into practice through the development of LabVIEW{trademark}VIs. These VIs were integrated with specially developed electronic circuits to provide a system for demonstrating the transmission and reception/reconstruction of typed messages and computer files. Tests were performed to determine the envelope for ultrasound transmission through pipes (with and without water) versus through air. The practical aspects of connections, efficient electronics, impedance matching, and the effect of damping mechanisms were all investigated. These tests resulted in a considerable number of reference charts that illustrate the absorption of ultrasound through different pipe materials, both with and without water, as a function of distance. Ultrasound was found to be least attenuated by copper pipe and most attenuated by PVC pipe. Water in the pipe provides additional damping and attenuation of ultrasonic signals. Dramatic improvements are observed, however, in ultrasound signal strength if the transducers are directly coupled to the water, rather than simply attaching them to the outside of

  14. Alternate Reductant Cold Cap Evaluation Furnace Phase II Testing

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, F. C. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Stone, M. E. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL); Miller, D. H. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2014-09-03

    Savannah River Remediation (SRR) conducted a Systems Engineering Evaluation (SEE) to determine the optimum alternate reductant flowsheet for the Defense Waste Processing Facility (DWPF). Specifically, two proposed flowsheets (nitric–formic–glycolic and nitric–formic–sugar) were evaluated based upon results from preliminary testing. Comparison of the two flowsheets among evaluation criteria indicated a preference towards the nitric–formic–glycolic flowsheet. Further research and development of this flowsheet eliminated the formic acid, and as a result, the nitric–glycolic flowsheet was recommended for further testing. Based on the development of a roadmap for the nitric–glycolic acid flowsheet, Waste Solidification Engineering (WS-E) issued a Technical Task Request (TTR) to address flammability issues that may impact the implementation of this flowsheet. Melter testing was requested in order to define the DWPF flammability envelope for the nitric-glycolic acid flowsheet. The Savannah River National Laboratory (SRNL) Cold Cap Evaluation Furnace (CEF), a 1/12th scale DWPF melter, was selected by the SRR Alternate Reductant project team as the melter platform for this testing. The overall scope was divided into the following sub-tasks as discussed in the Task Technical and Quality Assurance Plan (TTQAP): Phase I - A nitric–formic acid flowsheet melter test (unbubbled) to baseline the CEF cold cap and vapor space data to the benchmark melter flammability models; Phase II - A nitric–glycolic acid flowsheet melter test (unbubbled and bubbled) to: Define new cold cap reactions and global kinetic parameters in support of the melter flammability model development; Quantify off-gas surging potential of the feed; Characterize off-gas condensate for complete organic and inorganic carbon species. After charging the CEF with cullet from Phase I CEF testing, the melter was slurry-fed with glycolic flowsheet based SB6-Frit 418 melter feed at 36% waste

  15. Configuration management: Phase II implementation guidance

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    Configuration management (CM) is essential to maintaining an acceptable level of risk to the public, workers, environment, or mission success. It is a set of activities and techniques used to maintain consistency among physical and functional configuration, applicable requirements, and key documents. This document provides guidance for continuing the implementation of CM in a phased and graded manner. It describes a cost-effective approach to documented consistency with requirements, with early emphasis on items most important to safety and environmental protection. It is intended to help responsible line managers and configuration management staff personnel in meeting the Energy Systems configuration management policy standard.

  16. Individualized Inservice Teacher Education (Project In-Step). Evaluation Report. Phase III.

    Science.gov (United States)

    Thurber, John C.

    This is a report on the third phase of Project IN-STEP, which was intended to develop a viable model for individualized, multi-media in-service teacher education programs. (Phase I and II are reported in ED 033 905, and ED 042 709). The rationale for Phase III was to see if the model could be successfully transferred to an area other than teaching…

  17. Project management at Heysham II and Torness

    International Nuclear Information System (INIS)

    Taylor, D.

    1987-01-01

    The National Nuclear Corporation (NNC) have contracts from the Central Electricity Generating Board (CEGB) and the South of Scotland Electricity Board (SSEB) for the design and construction of the AGR Nuclear Power Stations at Heysham II and Torness. Within these contracts, procurement and construction of the various components making up the Nuclear Island are managed by NNC as agents of the two generating boards. Other responsibilities are for the design of the whole station, preparation of the safety case and on-site management of the Nuclear Island at both stations. Additional responsibilities are included in the Torness contract such that NNC manage almost the whole of the site works. Construction of both stations started in August 1980 and power raising is expected to commence on time at the end of this year. Both stations are close to the original budget. This paper examines factors which have contributed to this success including the relationship between NNC, the contractors, clients and the safety authority. (author)

  18. SIMMER-II analysis of transition-phase experiments

    International Nuclear Information System (INIS)

    Wehner, T.R.; Bell, C.R.

    1985-01-01

    Analyses of Los Alamos transition-phase experiments with the SIMMER-II computer code are reported. These transient boilup experiments simulated the recriticality-induced transient motion of a boiling pool of molten fuel, molten steel and steel vapor, within a subassembly duct in a liquid-metal fast breeder reactor during the transition phase of a core-disruptive accident. The two purposes of these experiments were to explore and reach a better understanding of fast reactor safety issues, and to provide data for SIMMER-II verification. Experimental data, consisting of four pressure traces and a high-speed movie, were recorded for four sets of initial conditions. For three of the four cases, SIMMER-II-calculated pressures compared reasonably well with the experimental pressures. After a modification to SIMMER-II's liquid-vapor drag correlation, the comparison for the fourth case was reasonable also. 12 refs., 4 figs

  19. Sputter-Resistant Materials for Electric Propulsion, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — This SBIR Phase 2 project shall develop sputter-resistant materials for use in electric propulsion test facilities and for plume shields on spacecraft using electric...

  20. Outcome Mapping Virtual Learning Community - Phase II | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    The first phase of the project (103520) focused on developing the Outcome ... as distance learning) and strategically communicating Outcome Mapping to key ... an organization based in India with South Asian reach, to facilitate exchange ...

  1. In-Process Monitoring of Additive Manufacturing, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — In Phase I of this project MLPC, WSU, and AFIT were successfully able to identify several optical data features that are indicative of the quality of components...

  2. Fine Water Mist Fire Extinguisher for Spacecraft, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — This three phase SBIR project from ADA Technologies Inc. (ADA) builds upon the experience of ADA in development of fine water mist (FWM) fire suppression technology....

  3. Phase II beam lines at the National Synchrotron Light Source

    International Nuclear Information System (INIS)

    Thomlinson, W.

    1984-06-01

    The expansion of the National Synchrotron Light Source has been funded by the US Department of Energy. The Phase II program consists of both increased conventional facilities and six new beam lines. In this paper, an overview of the six beam lines which will be constructed during Phase II is presented. For five of the lines special radiation sources are necessary and the designs of four of the devices are complete. The relevant parameters of the insertion devices under construction and development are presented

  4. CMS Phase II Upgrade Scope Document

    CERN Document Server

    Butler, J; Klute, M; Mans, J; Silvestris, L; on behalf of the CMS, Collaboration; CERN. Geneva. The LHC experiments Committee; LHCC

    2015-01-01

    The High-Luminosity LHC (HL-LHC) has been identified as the highest priority program in High Energy Physics by both the European Strategy Group and the US Particle Physics Project Prioritization Panel. To fulfil the full potential of this program, which includes the study of the nature of the Higgs boson, the investigation of the properties of any newly discovered particles in the upcoming LHC runs, and the extension of the mass reach for further discoveries, an integrated luminosity of 3000 fb-1 will have to be accumulated by the end of the program. In preparation for operation at the HL-LHC , CMS has documented the necessary upgrades and their expected costs in a Technical Proposal submitted to the CERN LHC Committee (LHCC) in mid-2015. The material presented in the current “Scope Document” provides additional information to assist the LHCC and the CERN Resource Review Board (RRB) in their review of the CMS upgrade. The document commences with a summary of the process followed to develop the scope of t...

  5. A Manhattan Project in Educational Technology, Part II.

    Science.gov (United States)

    Roberts, Wesley K.

    The initial four phases of the Training Extension Course (TEC), a project to remedy deficiencies in training programs for armed forces recruits, employed systematic instructional development and extensive audiovisual resources. The project required subcontracting for lesson production and modifications in personnel and budgeting. Posttest evidence…

  6. Performance of BEGe detectors for GERDA Phase II

    Energy Technology Data Exchange (ETDEWEB)

    Lazzaro, Andrea [Physik-Department E15, Technische Universitaet Muenchen (Germany); Collaboration: GERDA-Collaboration

    2015-07-01

    After the end of the data-taking for GERDA Phase I, the apparatus has been upgraded to fulfill the requirements of the second phase. Phase II sensitivity will be driven by 30 custom made BEGe detectors. This detectors are now available and can be operated in phaseII configuration in the GERDA cryostat together with the liquid argon scintillation veto. The performances of BEGe detectors in liquid argon are presented in this talk. Besides the spectroscopy capability, the focus will be placed on the expectations in terms of background rejection via pulse shape discrimination (PSD). In particular the main goal the BEGe's pulse shape analysis is to discriminate surface events produced by beta emitters (e.g. {sup 42}K) present in the liquid Ar.

  7. Final report on the surface-based investigation phase (phase 1) at the Mizunami Underground Research Laboratory project

    International Nuclear Information System (INIS)

    Saegusa, Hiromitsu; Matsuoka, Toshiyuki

    2011-03-01

    The Mizunami Underground Research Laboratory (MIU) Project is a comprehensive research project investigating the deep underground environment within crystalline rock being conducted by Japan Atomic Energy Agency at Mizunami City in Gifu Prefecture, central Japan and its role is defined in 'Framework for Nuclear Energy Policy' by Japan Atomic Energy Commission. The MIU Project has three overlapping phases: Surface-based Investigation phase (Phase I), Construction phase (Phase II), and Operation phase (Phase III), with a total duration of 20 years. The overall project goals of the MIU Project from Phase I through to Phase III are: 1) to establish techniques for investigation, analysis and assessment of the deep geological environment, and 2) to develop a range of engineering for deep underground application. During Phase I, the overall project goals were supported by Phase I goals. For the overall project goals 1), the Phase I goals were set to construct models of the geological environment from all surface-based investigation results that describe the geological environment prior to excavation and predict excavation response. For the overall project goals 2), the Phase I goals were set to formulate detailed design concepts and a construction plan for the underground facilities. This report summarizes the Phase I investigation which was completed in March 2005. The authors believe this report will make an important milestone, since this report clarifies how the Phase I goals are achieved and evaluate the future issues thereby direct the research which will be conducted during Phase II. With regard to the overall project goals 1), 'To establish techniques for investigation, analysis and assessment of the deep geological environment,' a step-wise investigation was conducted by iterating investigation, interpretation, and assessment, thereby understanding of geologic environment was progressively and effectively improved with progress of investigation. An optimal

  8. Canadian trace emissions project management : phase 2

    International Nuclear Information System (INIS)

    Lajeunesse, J.J.G.

    1997-12-01

    A comprehensive emission study was carried out at Nova Scotia Power's Lingan generating station in which pulverized coal, bottom ash, bottom ash cooling water, fly ash and flue gas were sampled and analyzed for organic and inorganic priority substances. The sampling was done according to the recommended standard of sampling provided by the Canadian Electricity Association's 1992 report entitled 'Trace Emission Project Management : phase 1'. The objectives of this emission study were to show how priority substances are transformed and partitioned within the various process streams in a modern pulverized coal-fired utility boiler and to determine the type and emission rate of various priority substances in the flue gas. An emission data set was prepared in PISCES format, and the data was used to evaluate the effectiveness of the electrostatic precipitator for controlling the emissions of these priority substances. All but five of the elements tracked in the report had mass balances from 90 per cent to 112 per cent. The five elements for which such closure could not be achieved were zinc, mercury, selenium, chlorine and bromine.The data set produced was used to evaluate the Ontario Hydro 640 MJ/h pilot scale combustor and FACT mathematical models. 39 refs., 32 tabs., 10 figs., 2 appendices

  9. Borehole project - Final report of phase 3

    International Nuclear Information System (INIS)

    Pusch, R.; Ramqvist, G.

    2008-03-01

    The report describes borehole plugging techniques for use in deep boreholes extending from the ground surface, and construction and placement of plugs in holes of different lengths and orientations bored from the repository rooms. The principle employed is the one proposed in earlier phases of the project, i.e. to tightly seal those parts of boreholes where the rock has few fractures and a low hydraulic conductivity, and filling of those parts that intersect water-bearing fracture zones with physically stable material that does not need to be low-permeable. Four methods for tight plugging have been identified and tested and a technique has been found for filling boreholes that are intersected by fracture zones. The upper end of boreholes extending from the ground surface needs a 'mechanical' seal for which copper metal and concrete work well. The experience from plugging of a 550 m deep borehole at Olkiluoto (OL-KR24) has been compiled and plans worked out for sampling and testing of contacting clay and concrete in this hole and in short holes in the Aespoe URL. (orig.)

  10. National Geoscience Data Repository System, Phase II. Final report, January 30, 1995--January 28, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    The American Geological Institute (AGI) has completed Phase II of a project to establish a National Geoscience Data Repository System (NGDRS). The project`s primary objectives are to preserve geoscience data in jeopardy of being destroyed and to make that data available to those who have a need to use it in future investigations. These data are available for donation to the public as a result of the downsizing that has occurred in the major petroleum and mining companies in the United States for the past decade. In recent years, these companies have consolidated domestic operations, sold many of their domestic properties and relinquished many of their leases. The scientific data associated with those properties are no longer considered to be useful assets and are consequently in danger of being lost forever. The national repository project will make many of these data available to the geoscience community for the first time. To address this opportunity, AGI sought support from the Department of Energy (DOE) in 1994 to initiate the NGDRS Phase I feasibility study to determine the types and quantity of data that companies would be willing to donate. The petroleum and mining companies surveyed indicated that they were willing to donate approximately five million well logs, one hundred million miles of seismic reflection data, millions of linear feet of core and cuttings, and a variety of other types of scientific data. Based on the positive results of the Phase I study, AGI undertook Phase II of the program in 1995. Funded jointly by DOE and industry, Phase II encompasses the establishment of standards for indexing and cataloging of geoscience data and determination of the costs of transferring data from the private sector to public-sector data repositories. Pilot projects evaluated the feasibility of the project for transfer of different data types and creation of a Web-based metadata supercatalog and browser.

  11. Catalytic combustion in gas stoves - Phase II

    Energy Technology Data Exchange (ETDEWEB)

    Hjelm, Anna-Karin [CATATOR AB, Lund (Sweden)

    2003-06-01

    . To overcome the latter, improved aeration of the system is needed, e.g. modification of nozzle-size and/or flame port plate. The effects of installing a retro-fit catalytic design onto the burner in the gas oven were also examined. Similar to the burners of the cooking plates, the emitted NO{sub x} was greatly reduced, i.e. up to 90 %. Other on-going projects using similar catalyst concepts as in this study have shown that the life-time of the catalyst, i.e. the mechanical stability and the catalytic activity, is extremely good (> 1000 h). To examine if this durability of the catalyst is limited in this specific application by deactivation caused by possible food spillage, a number of commonly used food ingredients were painted onto the catalysts and the activity of the catalyst prior to and after the 'deactivation' was investigated. The results show that no ingredients of organic type (fat, milk, egg, sugar) have any significant impact on the catalytic activity. Salt however was seen to block active reaction sites of the catalyst, but the tests showed that the catalyst could in this case be easily re-activated by simply washing it in water. The design modifications are very modest and the amount of catalyst is small, costing about 6-10 SEK (0.80-1.2 USD) per cooking plate.

  12. Qinshan Phase III (CANDU) nuclear power project quality assurance

    International Nuclear Information System (INIS)

    Wang Lingen; Du Jinxiang

    2001-01-01

    The completion and implementation of quality assurance system of Qinshan Phase III (CANDU) nuclear power project are presented. Some comments and understanding with consideration of the project characteristics are put forward

  13. Sears Point Tidal Marsh Restoration Project: Phase I

    Science.gov (United States)

    Information about the SFBWQP Sears Point Tidal Marsh Restoration Project: Phase I project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.

  14. The SafeBoosC Phase II Randomised Clinical Trial

    DEFF Research Database (Denmark)

    Pellicer, Adelina; Greisen, Gorm; Benders, Manon

    2013-01-01

    Near-infrared spectroscopy-derived regional tissue oxygen saturation of haemoglobin (rStO2) reflects venous oxygen saturation. If cerebral metabolism is stable, rStO2 can be used as an estimate of cerebral oxygen delivery. The SafeBoosC phase II randomised clinical trial hypothesises that the bur...

  15. The SafeBoosC phase II clinical trial

    DEFF Research Database (Denmark)

    Riera, Joan; Hyttel-Sorensen, Simon; Bravo, María Carmen

    2016-01-01

    BACKGROUND: The SafeBoosC phase II randomised clinical trial recently demonstrated the benefits of a combination of cerebral regional tissue oxygen saturation (rStO2) by near-infrared spectroscopy (NIRS) and a treatment guideline to reduce the oxygen imbalance in extremely preterm infants. AIMS: ...

  16. Caelyx (TM) in malignant mesothelioma : A phase II EORTC study

    NARCIS (Netherlands)

    Baas, P; van Meerbeeck, J; Groen, H; Schouwink, H; Burgers, S; Daamen, S; Giaccone, G

    Background: The use of doxorubicin has shown some activity in malignant mesothelioma but prolonged administration is hampered by cardiotoxicity. Caelyx(TM), a new liposomal and pegylated form of doxorubicin has shown a better pharmacokinetic and toxic profile then doxorubicin. In a phase II study,

  17. Microgrid Design, Development and Demonstration - Final Report for Phase I and Phase II

    Energy Technology Data Exchange (ETDEWEB)

    Bose, Sumit [GE Global Research Center, Niskayuna, NY (United States); Krok, Michael [GE Global Research Center, Niskayuna, NY (United States)

    2011-02-08

    This document constitutes GE’s final report for the Microgrid Design, Development and Demonstration program for DOE’s Office of Electricity Delivery and Energy Reliability, Award DE-FC02-05CH11349. It contains the final report for Phase I in Appendix I, and the results the work performed in Phase II. The program goal was to develop and demonstrate a Microgrid Energy Management (MEM) framework for a broad set of Microgrid applications that provides unified controls, protection, and energy management. This project contributed to the achievement of the U.S. Department of Energy’s Renewable and Distributed Systems Integration Program goals by developing a fully automated power delivery microgrid network that: - Reduces carbon emissions and emissions of other air pollutants through increased use of optimally dispatched renewable energy, - Increases asset use through integration of distributed systems, - Enhances reliability, security, and resiliency from microgrid applications in critical infrastructure protection, constrained areas of the electric grid, etc. - Improves system efficiency with on-site, distributed generation and improved economic efficiency through demand-side management.

  18. Viet Nam Economic Research Network (VERN) - Phase II | CRDI ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    VERN I (101273) constituted the first network for young economic researchers in Viet Nam, where previously there had been no modality for cooperation or peer review. Guided by the philosophy of "understanding and managing globalization" that underpinned the earlier project, VERN II proposes to expand the network, ...

  19. Mechanical Engineering and Design of the LHC Phase II Collimators

    CERN Document Server

    Bertarelli, A; Gentini, L; Mariani, N; Perret, R; Timmins, M A

    2010-01-01

    Phase II collimators will complement the existing system to improve the expected high RF impedance and limited efficiency of Phase I jaws. An international collaborative effort has been launched to identify novel advanced materials responding to the very challenging requirements of the new collimators. Complex numerical calculations simulating extreme conditions and experimental tests are in progress. In parallel, an innovative modular design concept of the jaw assembly is being developed to allow fitting in alternative materials, minimizing the thermally induced deformations, withstanding accidents and accepting high radiation doses. Phase II jaw assembly is made up of a molybdenum back-stiffener ensuring high geometrical stability and a modular jaw split in threes sectors. Each sector is equipped with a high-efficiency independent cooling circuit. Beam position monitors (BPM) are embedded in the jaws to fasten setup time and improve beam monitoring. An adjustment system will permit to fine-tune the jaw flat...

  20. Performance of the LAr scintillation veto of GERDA Phase II

    Energy Technology Data Exchange (ETDEWEB)

    Wiesinger, Christoph [Technische Universitaet Muenchen, Physik Dept. E15, James-Franck-Strasse, 85748 Garching (Germany); Collaboration: GERDA-Collaboration

    2015-07-01

    Gerda is an experiment to search for the neutrinoless double beta decay in {sup 76}Ge. Results of Phase I have been published in summer 2013 and Gerda is upgraded to Phase II. To reach the aspired background index of ≤ 10{sup -3} cts/(keV.kg.yr) for Phase II active background-suppression techniques are applied, including an active liquid argon (LAr) veto. It has been demonstrated with the LArGe test facility that the detection of argon scintillation light can be used to effectively suppress background events in the germanium, which simultaneously deposit energy in the LAr. The light instrumentation consisting of photomultiplier tubes (PMT) and wavelength-shifting fibers connected to silicon multipliers (SiPM) has been installed in Gerda. In this talk the low background design of the LAr veto and its performance during the commissioning runs are reported.

  1. A ProCoS II Project Final Report: ESPRIT Basic Research project 707

    DEFF Research Database (Denmark)

    Bowen, J. P.; Hoare, C. A. R.; Langmaack, Hans

    1996-01-01

    An overview of the research and associated activities of the Europeancollaborative ESPRIT Basic Research ProCoS II project (no. 7071) on``Provably Correct Systems'' which ran from 1992 to 1995 is presented.This was a follow-on project to ProCoS (no. 3104) and ran inparallel with the ProCoS Working...

  2. Phase 2 of the Nea TDB project and some lessons learned from the use of phase 1 data

    International Nuclear Information System (INIS)

    Spahiu, K.

    2002-01-01

    As the five initial reviews of the TDB Project come to their conclusion, the negotiations for an independently funded continuation of the TDB Project through two meetings of an ad hoc group were completed in late 1997. The participating organisations are ANSTO (Australia), NIRAS/ONDRAF (Belgium), RAWRA (Czech Republic), POSIVA (Finland), ANDRA and IPSN (France), FZK (Germany), JNC/PNC (Japan), ENRESA (Spain), SKB and SKI (Sweden), HSK, NAGRA and PSI (Switzerland), BNFL and NIREX (UK) and the DOE (USA). This project is referred to as the TDB Phase II Project, or simply TDB II. The following new reviews will be performed within this project: - an update of the existing U/Am/Tc/Np/Pu reviews (one review team for all elements); - the inorganic chemistry of Ni; - the inorganic chemistry of Se; - the complexation of selected simple organic ligands (ISA, EDTA, citrate and oxalate) with U, Am, Tc, Np, Pu, Ni, Se, Zr and some selected competing cations; the inorganic chemistry of Zr. These review areas have been decided on taking into account the toxicity, mobility, radioactivity and half-lives of the commonly occurring nuclides in radioactive waste, as well as the particular areas of interest of the funding organisations. To avoid the delays that have plagued Phase I, the organisation of the TDB Project has been restructured, and the funding provided has been calculated to cover all necessary expenses for the project. (author)

  3. Steam generator tube integrity program: Phase II, Final report

    Energy Technology Data Exchange (ETDEWEB)

    Kurtz, R.J.; Bickford, R.L.; Clark, R.A.; Morris, C.J.; Simonen, F.A.; Wheeler, K.R.

    1988-08-01

    The Steam Generator Tube Integrity Program (SGTIP) was a three phase program conducted for the US Nuclear Regulatory Commission (NRC) by Pacific Northwest Laboratory (PNL). The first phase involved burst and collapse testing of typical steam generator tubing with machined defects. The second phase of the SGTIP continued the integrity testing work of Phase I, but tube specimens were degraded by chemical means rather than machining methods. The third phase of the program used a removed-from-service steam generator as a test bed for investigating the reliability and effectiveness of in-service nondestructive eddy-current inspection methods and as a source of service degraded tubes for validating the Phase I and Phase II data on tube integrity. This report describes the results of Phase II of the SGTIP. The object of this effort included burst and collapse testing of chemically defected pressurized water reactor (PWR) steam generator tubing to validate empirical equations of remaining tube integrity developed during Phase I. Three types of defect geometries were investigated: stress corrosion cracking (SCC), uniform thinning and elliptical wastage. In addition, a review of the publicly available leak rate data for steam generator tubes with axial and circumferential SCC and a comparison with an analytical leak rate model is presented. Lastly, nondestructive eddy-current (EC) measurements to determine accuracy of defect depth sizing using conventional and alternate standards is described. To supplement the laboratory EC data and obtain an estimate of EC capability to detect and size SCC, a mini-round robin test utilizing several firms that routinely perform in-service inspections was conducted.

  4. Steam generator tube integrity program: Phase II, Final report

    International Nuclear Information System (INIS)

    Kurtz, R.J.; Bickford, R.L.; Clark, R.A.; Morris, C.J.; Simonen, F.A.; Wheeler, K.R.

    1988-08-01

    The Steam Generator Tube Integrity Program (SGTIP) was a three phase program conducted for the US Nuclear Regulatory Commission (NRC) by Pacific Northwest Laboratory (PNL). The first phase involved burst and collapse testing of typical steam generator tubing with machined defects. The second phase of the SGTIP continued the integrity testing work of Phase I, but tube specimens were degraded by chemical means rather than machining methods. The third phase of the program used a removed-from-service steam generator as a test bed for investigating the reliability and effectiveness of in-service nondestructive eddy-current inspection methods and as a source of service degraded tubes for validating the Phase I and Phase II data on tube integrity. This report describes the results of Phase II of the SGTIP. The object of this effort included burst and collapse testing of chemically defected pressurized water reactor (PWR) steam generator tubing to validate empirical equations of remaining tube integrity developed during Phase I. Three types of defect geometries were investigated: stress corrosion cracking (SCC), uniform thinning and elliptical wastage. In addition, a review of the publicly available leak rate data for steam generator tubes with axial and circumferential SCC and a comparison with an analytical leak rate model is presented. Lastly, nondestructive eddy-current (EC) measurements to determine accuracy of defect depth sizing using conventional and alternate standards is described. To supplement the laboratory EC data and obtain an estimate of EC capability to detect and size SCC, a mini-round robin test utilizing several firms that routinely perform in-service inspections was conducted

  5. Medical information, communication, and archiving system (MICAS): Phase II integration and acceptance testing

    Science.gov (United States)

    Smith, Edward M.; Wandtke, John; Robinson, Arvin E.

    1999-07-01

    The Medical Information, Communication and Archive System (MICAS) is a multi-modality integrated image management system that is seamlessly integrated with the Radiology Information System (RIS). This project was initiated in the summer of 1995 with the first phase being installed during the first half of 1997 and the second phase installed during the summer of 1998. Phase II enhancements include a permanent archive, automated workflow including modality worklist, study caches, NT diagnostic workstations with all components adhering to Digital Imaging and Communications in Medicine (DICOM) standards. This multi-vendor phased approach to PACS implementation is designed as an enterprise-wide PACS to provide images and reports throughout our healthcare network. MICAS demonstrates that aa multi-vendor open system phased approach to PACS is feasible, cost-effective, and has significant advantages over a single vendor implementation.

  6. Development of ceramics based fuel, Phase II; Razvoj goriva na bazi keramike, II faza

    Energy Technology Data Exchange (ETDEWEB)

    Ristic, M M [Institute of Nuclear Sciences Vinca, Laboratorija za reaktorske materijale, Beograd (Serbia and Montenegro)

    1962-12-15

    Phase II of this task covers the following: testing the changes of UO{sub 2} properties during sintering; interpretation of results obtained from the analysis of the sintering process kinetics; fabrication of UO{sub 2} samples with cladding by vibrational compacting.

  7. Status report of the Gerda Phase II startup

    International Nuclear Information System (INIS)

    D’Andrea, Valerio

    2017-01-01

    The GERmanium Detector Array (Gerda) experiment, located at the Laboratori Nazionali del Gran Sasso (LNGS) of INFN, searches for 0νββ of "7"6Ge. Germanium diodes enriched to ∼ 86 % in the double beta emitter "7"6Ge ("e"n"rGe) are exposed being both source and detector of 0νββ decay. This process is considered a powerful probe to address still open issues in the neutrino sector of the (beyond) Standard Model of particle Physics. Since 2013, at the completion of the first experimental phase (Phase I), the Gerda setup has been upgraded to perform its next step (Phase II). The aim is to reach a sensitivity to the 0νββ decay half life larger than 10"2"6 yr in about 3 years of physics data taking, exposing a detector mass of about 35 kg of "e"n"rGe with a background index of about 10"−"3cts/(keV·kg·yr). One of the main new implementations is the liquid argon (LAr) scintillation light read-out, to veto those events that only partially deposit their energy both in Ge and in the surrounding LAr. In this paper the Gerda Phase II expected goals, the upgraded items and few selected features from the first 2016 physics and calibration runs will be presented. The main Phase I achievements will be also reviewed.

  8. Status report of the Gerda Phase II startup

    Science.gov (United States)

    D'Andrea, Valerio; Gerda Collaboration

    2017-01-01

    The GERmanium Detector Array (GERDA) experiment, located at the Laboratori Nazionali del Gran Sasso (LNGS) of INFN, searches for 0νββ of 76Ge . Germanium diodes enriched to ˜ 86 % in the double beta emitter 76Ge ( enrGe are exposed being both source and detector of 0νββ decay. This process is considered a powerful probe to address still open issues in the neutrino sector of the (beyond) Standard Model of particle Physics. Since 2013, at the completion of the first experimental phase (Phase I), the GERDA setup has been upgraded to perform its next step (Phase II). The aim is to reach a sensitivity to the 0νββ decay half-life larger than 10^{26} yr in about 3 years of physics data taking, exposing a detector mass of about 35 kg of enrGe with a background index of about 10^{-3} cts/(keV . kg . yr). One of the main new implementations is the liquid argon (LAr) scintillation light read-out, to veto those events that only partially deposit their energy both in Ge and in the surrounding LAr. In this paper the GERDA Phase II expected goals, the upgraded items and few selected features from the first 2016 physics and calibration runs will be presented. The main Phase I achievements will be also reviewed.

  9. Phase II cancer clinical trials for biomarker-guided treatments.

    Science.gov (United States)

    Jung, Sin-Ho

    2018-01-01

    The design and analysis of cancer clinical trials with biomarker depend on various factors, such as the phase of trials, the type of biomarker, whether the used biomarker is validated or not, and the study objectives. In this article, we demonstrate the design and analysis of two Phase II cancer clinical trials, one with a predictive biomarker and the other with an imaging prognostic biomarker. Statistical testing methods and their sample size calculation methods are presented for each trial. We assume that the primary endpoint of these trials is a time to event variable, but this concept can be used for any type of endpoint.

  10. OSAS Surgery and Postoperative Discomfort: Phase I Surgery versus Phase II Surgery

    Directory of Open Access Journals (Sweden)

    Giulio Gasparini

    2015-01-01

    Full Text Available Introduction. This study aims to investigate the reasons that discourage the patients affected by OSAS to undergo orthognathic surgery and compares the postoperative discomfort of phase I (soft tissue surgery and phase II (orthognathic surgery procedures for treatment of OSAS. Material and Methods. A pool of 46 patients affected by OSAS was divided into two groups: “surgery patients” who accepted surgical treatments of their condition and “no surgery patients” who refused surgical procedures. The “surgery patients” group was further subdivided into two arms: patients who accepted phase I procedures (IP and those who accepted phase II (IIP. To better understand the motivations behind the refusal of II phase procedures, we asked the patients belonging to both the IP group and “no surgery” group to indicate the main reason that influenced their decision to avoid II phase procedures. We also monitored and compared five parameters of postoperative discomfort: pain, painkiller assumption, length of hospitalization, foreign body sensation, and diet assumption following IP and IIP procedures. Results. The main reason to avoid IIP procedures was the concern of a more severe postoperative discomfort. Comparison of the postoperative discomfort following IP versus IIP procedures showed that the former scored worse in 4 out of 5 parameters analyzed. Conclusion. IIP procedures produce less postoperative discomfort. IIP procedures, namely, orthognathic surgery, should be the first choice intervention in patients affected by OSAS and dentoskeletal malformation.

  11. Study of the GERDA Phase II background spectrum

    Science.gov (United States)

    Agostini, M.; Allardt, M.; Bakalyarov, A. M.; Balata, M.; Barabanov, I.; Baudis, L.; Bauer, C.; Bellotti, E.; Belogurov, S.; Belyaev, S. T.; Benato, G.; Bettini, A.; Bezrukov, L.; Bode, T.; Borowicz, D.; Brudanin, V.; Brugnera, R.; Caldwell, A.; Cattadori, C.; Chernogorov, A.; D'Andrea, V.; Demidova, E. V.; Di Marco, N.; Domula, A.; Doroshkevich, E.; Egorov, V.; Falkenstein, R.; Frodyma, N.; Gangapshev, A.; Garfagnini, A.; Gooch, C.; Grabmayr, P.; Gurentsov, V.; Gusev, K.; Hakenmüller, J.; Hegai, A.; Heisel, M.; Hemmer, S.; Hofmann, W.; Hult, M.; Inzhechik, L. V.; Janicskó Csáthy, J.; Jochum, J.; Junker, M.; Kazalov, V.; Kihm, T.; Kirpichnikov, I. V.; Kirsch, A.; Kish, A.; Klimenko, A.; Kneißl, R.; Knöpfle, K. T.; Kochetov, O.; Kornoukhov, V. N.; Kuzminov, V. V.; Laubenstein, M.; Lazzaro, A.; Lebedev, V. I.; Lehnert, B.; Liao, H. Y.; Lindner, M.; Lippi, I.; Lubashevskiy, A.; Lubsandorzhiev, B.; Lutter, G.; Macolino, C.; Majorovits, B.; Maneschg, W.; Medinaceli, E.; Miloradovic, M.; Mingazheva, R.; Misiaszek, M.; Moseev, P.; Nemchenok, I.; Palioselitis, D.; Panas, K.; Pandola, L.; Pelczar, K.; Pullia, A.; Riboldi, S.; Rumyantseva, N.; Sada, C.; Salamida, F.; Salathe, M.; Schmitt, C.; Schneider, B.; Schönert, S.; Schreiner, J.; Schulz, O.; Schütz, A.-K.; Schwingenheuer, B.; Selivanenko, O.; Shevzik, E.; Shirchenko, M.; Simgen, H.; Smolnikov, A.; Stanco, L.; Vanhoefer, L.; Vasenko, A. A.; Veresnikova, A.; von Sturm, K.; Wagner, V.; Wegmann, A.; Wester, T.; Wiesinger, C.; Wojcik, M.; Yanovich, E.; Zhitnikov, I.; Zhukov, S. V.; Zinatulina, D.; Zuber, K.; Zuzel, G.

    2017-09-01

    The Gerda experiment, located at the Laboratori Nazionali del Gran Sasso (LNGS) of INFN in Italy, searches for the neutrinoless double beta (0νββ) decay of 76Ge. Gerda Phase II is aiming to reach a sensitivity for the 0νββ half life of 1026 yr in ˜ 3 years of physics data taking with 100 kg·yr of exposure and a background index of ˜ 10-3 cts/(keV·kg·yr). After 6 months of acquisition a first data release with 10.8 kg·yr of exposure is performed, showing that the design background is achieved. In this work a study of the Phase II background spectrum, the main spectral structures and the background sources will be presented and discussed.

  12. Urban Integrated Industrial Cogeneration Systems Analysis. Phase II final report

    Energy Technology Data Exchange (ETDEWEB)

    1984-01-01

    Through the Urban Integrated Industrial Cogeneration Systems Analysis (UIICSA), the City of Chicago embarked upon an ambitious effort to identify the measure the overall industrial cogeneration market in the city and to evaluate in detail the most promising market opportunities. This report discusses the background of the work completed during Phase II of the UIICSA and presents the results of economic feasibility studies conducted for three potential cogeneration sites in Chicago. Phase II focused on the feasibility of cogeneration at the three most promising sites: the Stockyards and Calumet industrial areas, and the Ford City commercial/industrial complex. Each feasibility case study considered the energy load requirements of the existing facilities at the site and the potential for attracting and serving new growth in the area. Alternative fuels and technologies, and ownership and financing options were also incorporated into the case studies. Finally, site specific considerations such as development incentives, zoning and building code restrictions and environmental requirements were investigated.

  13. IDC Reengineering Phase 2 & 3 Project Scope

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Prescott, Ryan [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-10-01

    Sandia National Laboratories has prepared a cost estimate budgetary planning for the IDC Reengineering Phase 2 & 3 effort. This report provides the cost estimate and describes the methodology, assumptions, and cost model details used to create the cost estimate.

  14. African Transitional Justice Research Network - Phase II | CRDI ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    The African Transitional Justice Research Network (ATJRN) aims to strengthen the capacity of African researchers and civil society institutions to conduct effective human rights advocacy through the production of high-quality, locally based and targeted empirical research. Phase I of the project (102862) focused on creating ...

  15. African Transitional Justice Research Network - Phase II | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    The African Transitional Justice Research Network (ATJRN) aims to strengthen the capacity of African researchers and civil society institutions to conduct effective human rights advocacy through the production of high-quality, locally based and targeted empirical research. Phase I of the project (102862) focused on creating ...

  16. Configurable Project Collaboration Portal, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — SplashNote Systems is proposing to develop a more effective and innovative approach to project collaboration in distributed teams. The proposed system uniquely gives...

  17. Gates Precast Concrete User Project Phase 1

    Energy Technology Data Exchange (ETDEWEB)

    Love, Lonnie J. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Post, Brian K. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Roschli, Alex C. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Chesser, Phillip C. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2017-09-01

    The primary objective of the project was to demonstrate the viability of using carbon fiber reinforced ABS plastic and the Big Area Additive Manufacturing (BAAM) technology to rapidly manufacture molds for the precast concrete industry.

  18. Malignant pleural mesothelioma: a phase II trial with docetaxel.

    Science.gov (United States)

    Vorobiof, D A; Rapoport, B L; Chasen, M R; Abratt, R P; Cronje, N; Fourie, L; McMichael, G; Hacking, D

    2002-03-01

    Current cytotoxic therapy has been of limited benefit to patients with malignant pleural mesothelioma. Single agent chemotherapy has been extensively evaluated in small series of phase II clinical trials, with disappointing responses. Docetaxel, an effective taxane in the treatment of advanced breast cancer and non-small-cell lung cancer, was administered intravenously at a dose of 100 mg/m2 every 3 weeks to 30 chemotherapy naive patients with malignant pleural mesothelioma in a prospective multi-institutional phase II clinical trial. An objective response rate (partial responses) of 10% was documented. Additionally, 21% of the patients had minor responses (intention-to-treat analysis). Three patients died within 2 weeks post-first cycle of therapy, although only one patient's death was directly attributed to the investigational drug, whilst in the majority of the patients, manageable and treatable toxicities were encountered. In this phase II clinical trial, docetaxel proved to be mildly effective in the treatment of patients with malignant pleural mesothelioma.

  19. Reassessing Phase II Heart Failure Clinical Trials: Consensus Recommendations

    Science.gov (United States)

    Butler, Javed; Hamo, Carine E.; Udelson, James E.; O’Connor, Christopher; Sabbah, Hani N.; Metra, Marco; Shah, Sanjiv J.; Kitzman, Dalane W.; Teerlink, John; Bernstein, Harold S.; Brooks, Gabriel; Depre, Christophe; DeSouza, Mary M.; Dinh, Wilfried; Donovan, Mark; Frische-Danielson, Regina; Frost, Robert J.; Garza, Dahlia; Gohring, Udo-Michael; Hellawell, Jennifer; Hsia, Judith; Ishihara, Shiro; Kay-Mugford, Patricia; Koglin, Joerg; Kozinn, Marc; Larson, Christopher J.; Mayo, Martha; Gan, Li-Ming; Mugnier, Pierrre; Mushonga, Sekayi; Roessig, Lothar; Russo, Cesare; Salsali, Afshin; Satler, Carol; Shi, Victor; Ticho, Barry; van der Laan, Michael; Yancy, Clyde; Stockbridge, Norman; Gheorghiade, Mihai

    2017-01-01

    The increasing burden and the continued suboptimal outcomes for patients with heart failure underlines the importance of continued research to develop novel therapeutics for this disorder. This can only be accomplished with successful translation of basic science discoveries into direct human application through effective clinical trial design and execution that results in a substantially improved clinical course and outcomes. In this respect, phase II clinical trials play a pivotal role in determining which of the multitude of potential basic science discoveries should move to the large and expansive registration trials in humans. A critical examination of the phase II trials in heart failure reveals multiple shortcomings in their concept, design, execution, and interpretation. To further a dialogue regarding the challenges and potential for improvement and the role of phase II trials in patients with heart failure, the Food and Drug Administration facilitated a meeting on October 17th 2016 represented by clinicians, researchers, industry members, and regulators. This document summarizes the discussion from this meeting and provides key recommendations for future directions. PMID:28356300

  20. webinos project deliverable: Phase 1 Security Framework

    OpenAIRE

    webinos consortium

    2011-01-01

    The webinos project aims to deliver a cross-device web application runtime environment, providing a unified development platform and standardized inter-device communication and interaction. This document contains the first iteration of the technical security and privacy framework designed for the webinos project. It accompanies two other documents - D3.1 System Specification and D3.2 API Specifications - and refers to concepts developed in them. The security and privacy architecture aims to p...

  1. Free-Piston Stirling Power Conversion Unit for Fission Power System, Phase II Final Report

    Science.gov (United States)

    Wood, J. Gary; Stanley, John

    2016-01-01

    In Phase II, the manufacture and testing of two 6-kW(sub e)Stirling engines was completed. The engines were delivered in an opposed 12-kW(sub e) arrangement with a common expansion space heater head. As described in the Phase I report, the engines were designed to be sealed both hermetically and with a bolted O-ring seal. The completed Phase II convertor is in the bolted configuration to allow future disassembly. By the end of Phase II, the convertor had passed all of the final testing requirements in preparation for delivery to the NASA Glenn Research Center. The electronic controller also was fabricated and tested during Phase II. The controller sets both piston amplitudes and maintains the phasing between them. It also sets the operating frequency of the machine. Details of the controller are described in the Phase I final report. Fabrication of the direct-current to direct-current (DC-DC) output stage, which would have stepped down the main controller output voltage from 700 to 120 V(sub DC), was omitted from this phase of the project for budgetary reasons. However, the main controller was successfully built, tested with the engines, and delivered. We experienced very few development issues with this high-power controller. The project extended significantly longer than originally planned because of yearly funding delays. The team also experienced several hardware difficulties along the development path. Most of these were related to the different thermal expansions of adjacent parts constructed of different materials. This issue was made worse by the large size of the machine. Thermal expansion problems also caused difficulties in the brazing of the opposed stainless steel sodium-potassium (NaK) heater head. Despite repeated attempts Sunpower was not able to successfully braze the opposed head under this project. Near the end of the project, Glenn fabricated an opposed Inconel NaK head, which was installed prior to delivery for testing at Glenn. Engine

  2. MANHATTAN DISTRICT HISTORY PROJECT Y THE LOS ALAMOS PROJECT VOL. II AUGUST 1945 THROUGH DECEMBER 1946

    Energy Technology Data Exchange (ETDEWEB)

    Truslow, E. C.; Smith, R. C.

    1961-12-01

    THESE TWO VOLUMES CONSTITUTE A RECORD OF THE TECHNICAL, ADMINISTRATIVE , AND POLICY-MAKING ACTIVITIES OF THE LOS ALAMOS PROJECT (PROJECT Y) FROM ITS INCEPTION UNDER THE MANHATTAN DISTRICT THROUGH THE DEVELOPMENT OF THE ATOMIC BOMB (VOL. I), AND DURING THE PERIOD FOLLOWING THE END OF WORLD WAR II UNTIL THE MANHATTAN DISTRICT RELINQUISHED CONTROL TO THE ATOMIC ENERGY COMMISSION AS OF JANUARY 1947 (VOL. II). ALTHOUGH SEC URITY REGULATIONS HAVE REQUIRED SOME DELETIONS IN THE ORIGINAL TEXT OF THE TWO VOLUMES, EVERY EFFORT HAS BEEN MADE TO RETAIN THE ORIGINAL LANGUGAGE AND EXPERSSIONS OF THE AUTHORS.

  3. Tailoring Small IT Projects in the Project Planning Phase

    Science.gov (United States)

    Mulhearn, Michael F.

    2011-01-01

    Project management (PM) and systems engineering (SE) are essential skills in information technology (IT). There is an abundance of information available detailing the comprehensive bodies of knowledge, standards, and best practices. Despite the volume of information, there is surprisingly little information about how to tailor PM and SE tasks for…

  4. Probability of success for phase III after exploratory biomarker analysis in phase II.

    Science.gov (United States)

    Götte, Heiko; Kirchner, Marietta; Sailer, Martin Oliver

    2017-05-01

    The probability of success or average power describes the potential of a future trial by weighting the power with a probability distribution of the treatment effect. The treatment effect estimate from a previous trial can be used to define such a distribution. During the development of targeted therapies, it is common practice to look for predictive biomarkers. The consequence is that the trial population for phase III is often selected on the basis of the most extreme result from phase II biomarker subgroup analyses. In such a case, there is a tendency to overestimate the treatment effect. We investigate whether the overestimation of the treatment effect estimate from phase II is transformed into a positive bias for the probability of success for phase III. We simulate a phase II/III development program for targeted therapies. This simulation allows to investigate selection probabilities and allows to compare the estimated with the true probability of success. We consider the estimated probability of success with and without subgroup selection. Depending on the true treatment effects, there is a negative bias without selection because of the weighting by the phase II distribution. In comparison, selection increases the estimated probability of success. Thus, selection does not lead to a bias in probability of success if underestimation due to the phase II distribution and overestimation due to selection cancel each other out. We recommend to perform similar simulations in practice to get the necessary information about the risk and chances associated with such subgroup selection designs. Copyright © 2017 John Wiley & Sons, Ltd.

  5. Neutrinoless double beta decay in GERDA Phase II

    International Nuclear Information System (INIS)

    Macolino, C.

    2014-01-01

    The GERmanium Detector Array, GERDA, is designed to search for neutrinoless double beta (0νββ) decay of 76 Ge and it is installed in the Laboratori Nazionali del Gran Sasso (LNGS) of INFN, Italy. The GERDA experiment has completed the Phase I with a total collected exposure of 21.6 kg yr and a background index (BI) of the order of BI ≃ 10 −2 cts/(keVkg yr). No excess of events from 0νββ decay has been observed and a lower limit on the half-life on the 0νββ decay for 76 Ge has been estimated: T 0ν 1 /2 > 2.1·10 25 yr at 90% CL. The goal of GERDA Phase II is to reach the target sensitivity of T 0ν 1 /2 ≃ 1.4 · 10 26 yr, with an increased total mass of the enriched material and a reduced background level. In this paper the results from GERDA Phase I and the major improvements planned for Phase II are discussed.

  6. Maqarin natural analogue project: Phase IV. Reconnaissance mission report (April 28 to May 7, 1999)

    Energy Technology Data Exchange (ETDEWEB)

    Smellie, J.A.T. [ed.] [Conterra AB, Uppsala (Sweden)

    2000-08-01

    Final planning of the Technical Proposal for Phase IV of the Maqarin Natural Analogue Project was preceded by a ten day Reconnaissance Mission to the Jordan sites. The main objective of this mission was to: i) allow new organisations within the project to become familiar with the geological context of the Maqarin and Central Jordan sites and also to appreciate the prevailing technical and logistical limitations, ii) carry out limited field investigations, and iii) based on the experience from these two points, provide the opportunity to finalise the Maqarin Phase IV Technical Proposal. This report details the results of the mission.

  7. Maqarin natural analogue project: Phase IV. Reconnaissance mission report (April 28 to May 7, 1999)

    International Nuclear Information System (INIS)

    Smellie, J.A.T.

    2000-08-01

    Final planning of the Technical Proposal for Phase IV of the Maqarin Natural Analogue Project was preceded by a ten day Reconnaissance Mission to the Jordan sites. The main objective of this mission was to: i) allow new organisations within the project to become familiar with the geological context of the Maqarin and Central Jordan sites and also to appreciate the prevailing technical and logistical limitations, ii) carry out limited field investigations, and iii) based on the experience from these two points, provide the opportunity to finalise the Maqarin Phase IV Technical Proposal. This report details the results of the mission

  8. Advanced materials for future Phase II LHC collimators

    CERN Document Server

    Dallocchio, A; Arnau Izquierdo, G; Artoos, K

    2009-01-01

    Phase I collimators, equipped with Carbon-Carbon jaws, effectively met specifications for the early phase of LHC operation. However, the choice of carbon-based materials is expected to limit the nominal beam intensity mainly because of the high RF impedance and limited efficiency of the collimators. Moreover, C/C may be degraded by high radiation doses. To overcome these limitations, new Phase II secondary collimators will complement the existing system. Their extremely challenging requirements impose a thorough material investigation effort aiming at identifying novel materials combining very diverse properties. Relevant figures of merit have been identified to classify materials: Metal-diamonds composites look a promising choice as they combine good thermal, structural and stability properties. Molybdenum is interesting for its good thermal stability. Ceramics with non-conventional RF performances are also being evaluated. The challenges posed by the development and industrialization of these materials are ...

  9. Tank waste remediation system privatization Phase 1 infrastructure, project W-519, project execution plan

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented

  10. Final report on the surface-based investigation (phase 1) at the Mizunami Underground Laboratory project

    International Nuclear Information System (INIS)

    Saegusa, Hiromitsu; Seno, Yasuhiro; Nakama, Shigeo; Tsuruta, Tadahiko; Amano, Kenji; Takeuchi, Ryuji; Matsuoka, Toshiyuki; Onoe, Hironori; Mizuno, Takashi; Ohyama, Takuya; Hama, Katsuhiro; Sato, Toshinori; Kuji, Masayoshi; Kuroda, Hidetaka; Semba, Takeshi; Uchida, Masahiro; Sugihara, Kozo; Sakamaki, Masanori; Iwatsuki, Teruki

    2007-03-01

    The Mizunami Underground Laboratory (MIU) Project is a comprehensive research project investigating the deep underground environment within crystalline rock being conducted by Japan Atomic Energy Agency at Mizunami City in Gifu Prefecture, central Japan and its role is defined in 'Framework for Nuclear Energy Policy' by Japan Atomic Energy Commission. The MIU Project has three overlapping phases: Surface-based Investigation phase (Phase I), Construction phase (Phase II), and Operation phase (Phase III), with a total duration of 20 years. The overall project goals of the MIU Project from Phase I through to Phase III are: 1) to establish techniques for investigation, analysis and assessment of the deep geological environment, and 2) to develop a range of engineering for deep underground application. During Phase I, the overall project goals were supported by Phase I goals. For the overall project goals 1), the Phase I goals were set to construct models of the geological environment from all surface-based investigation results that describe the geological environment prior to excavation and predict excavation response. For the overall project goals 2), the Phase I goals were set to formulate detailed design concepts and a construction plan for the underground facilities. This report summarizes the Phase I investigation which was completed in March 2005. The authors believe this report will make an important milestone, since this report clarifies how the Phase I goals are achieved and evaluate the future issues thereby direct the research which will be conducted during Phase II. With regard to the overall project goals 1), 'To establish techniques for investigation, analysis and assessment of the deep geological environment,' a step-wise investigation was conducted by iterating investigation, interpretation, and assessment, thereby understanding of geologic environment was progressively and effectively improved with progress of investigation. An optimal procedure from

  11. Wind River Watershed Project; 1998 Annual Report; Volume II

    International Nuclear Information System (INIS)

    Connolly, Patrick J.

    1999-01-01

    The authors report here their on-ground restoration actions. Part 1 describes work conducted by the Underwood Conservation District (UCD) on private lands. This work involves the Stabler Cut-Bank project. Part 2 describes work conducted by the U.S. Forest Service. The Stabler Cut-Bank Project is a cooperative stream restoration effort between Bonneville Power Administration (BPA), the UCD, private landowners, the U.S. Forest Service (USFS), and the U.S. Fish and Wildlife Service (USFWS). The Stabler site was identified by UCD during stream surveys conducted in 1996 as part of a USFWS funded project aimed at initiating water quality and habitat restoration efforts on private lands in the basin. In 1997 the Wind River Watershed Council selected the project as a top priority demonstration project. The landowners were approached by the UCD and a partnership developed. Due to their expertise in channel rehabilitation, the Forest Service was consulted for the design and assisted with the implementation of the project. A portion of the initial phase of the project was funded by USFWS. However, the majority of funding (approximately 80%) has been provided by BPA and it is anticipated that additional work that is planned for the site will be conducted with BPA funds

  12. Improving decision making in the early phases of configuration projects

    DEFF Research Database (Denmark)

    Mortensen, Niels Henrik; Harlou, Ulf; Haug, Anders

    2008-01-01

    During the early phases of configuration projects very important decisions are made which will heavily influence the performance of the company, benefits in different functional areas (production, sales, purchase, product development, service etc), maintenance of the configuration system...

  13. Improving decision making in the early phases of configuration projects

    DEFF Research Database (Denmark)

    Mortensen, Niels Henrik; Hvam, Lars; Harlou, Ulf

    2011-01-01

    During the early phases of configuration projects very important decisions are made which will heavily influence the performance of the company, benefits in different functional areas (production, sales, purchase, product development, service etc), maintenance of the configuration system...

  14. Estuary 2100 Project, Phase 2: Building Partnerships for Resilient Watersheds

    Science.gov (United States)

    Information about the SFBWQP Estuary 2100 Project, Phase 2: Building Partnerships for Resilient Watersheds, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquat

  15. NASA SBIR abstracts of 1990 phase 1 projects

    Science.gov (United States)

    Schwenk, F. C.; Gilman, J. A.; Paige, J. B.

    1991-01-01

    The research objectives of the 280 projects placed under contract in the National Aeronautics and Space Administration (NASA) 1990 Small Business Innovation Research (SBIR) Phase 1 program are described. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses in response to NASA's 1990 SBIR Phase 1 Program Solicitation. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 280, in order of its appearance in the body of the report. The document also includes Appendixes to provide additional information about the SBIR program and permit cross-reference in the 1990 Phase 1 projects by company name, location by state, principal investigator, NASA field center responsible for management of each project, and NASA contract number.

  16. 40 CFR 72.73 - State issuance of Phase II permits.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false State issuance of Phase II permits. 72.73 Section 72.73 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.73 State issuance of Phase II permits...

  17. The Lunar Phases Project: A Mental Model-Based Observational Project for Undergraduate Nonscience Majors

    Science.gov (United States)

    Meyer, Angela Osterman; Mon, Manuel J.; Hibbard, Susan T.

    2011-01-01

    We present our Lunar Phases Project, an ongoing effort utilizing students' actual observations within a mental model building framework to improve student understanding of the causes and process of the lunar phases. We implement this project with a sample of undergraduate, nonscience major students enrolled in a midsized public university located…

  18. Uncertainty in project phases: A framework for organisational change management

    DEFF Research Database (Denmark)

    Kreye, Melanie; Balangalibun, Sarah

    2015-01-01

    in the early stage of the change project but was delayed until later phases. Furthermore, the sources of uncertainty were found to be predominantly within the organisation that initiated the change project and connected to the project scope. Based on these findings, propositions for future research are defined......Uncertainty is an integral challenge when managing organisational change projects (OCPs). Current literature highlights the importance of uncertainty; however, falls short of giving insights into the nature of uncertainty and suggestions for managing it. Specifically, no insights exist on how...... uncertainty develops over the different phases of OCPs. This paper presents case-based evidence on different sources of uncertainty in OCPs and how these develop over the different project phases. The results showed some surprising findings as the majority of the uncertainty did not manifest itself...

  19. Search for neutrinoless double beta decay with GERDA phase II

    Science.gov (United States)

    Agostini, M.; Bakalyarov, A. M.; Balata, M.; Barabanov, I.; Baudis, L.; Bauer, C.; Bellotti, E.; Belogurov, S.; Bettini, A.; Bezrukov, L.; Bode, T.; Borowicz, D.; Brudanin, V.; Brugnera, R.; Caldwell, A.; Cattadori, C.; Chernogorov, A.; D'Andrea, V.; Demidova, E. V.; Di Marco, N.; Domula, A.; Doroshkevich, E.; Egorov, V.; Falkenstein, R.; Gangapshev, A.; Garfagnini, A.; Gooch, C.; Grabmayr, P.; Gurentsov, V.; Gusev, K.; Hakenmüller, J.; Hegai, A.; Heisel, M.; Hemmer, S.; Hofmann, W.; Hult, M.; Inzhechik, L. V.; Csáthy, J. Janicskó; Jochum, J.; Junker, M.; Kazalov, V.; Kihm, T.; Kirpichnikov, I. V.; Kirsch, A.; Kish, A.; Klimenko, A.; Kneißl, R.; Knies, J.; Knöpfle, K. T.; Kochetov, O.; Kornoukhov, V. N.; Kuzminov, V. V.; Laubenstein, M.; Lazzaro, A.; Lebedev, V. I.; Liao, H. Y.; Lindner, M.; Lippi, I.; Lubashevskiy, A.; Lubsandorzhiev, B.; Lutter, G.; Majorovits, B.; Maneschg, W.; Marissens, G.; Miloradovic, M.; Mingazheva, R.; Misiaszek, M.; Moseev, P.; Nemchenok, I.; Panas, K.; Pandola, L.; Pelczar, K.; Pullia, A.; Ransom, C.; Reissfelder, M.; Riboldi, S.; Rumyantseva, N.; Sada, C.; Salamida, F.; Schmitt, C.; Schneider, B.; Schönert, S.; Schreiner, J.; Schulz, O.; Schütz, A.-K.; Schwingenheuer, B.; Seitz, H.; Selivanenko, O.; Shevchik, E.; Shirchenko, M.; Simgen, H.; Smolnikov, A.; Stanco, L.; Vanhoefer, L.; Vasenko, A. A.; Veresnikova, A.; von Sturm, K.; Wagner, V.; Wegmann, A.; Wester, T.; Wiesinger, C.; Wojcik, M.; Yanovich, E.; Zhitnikov, I.; Zhukov, S. V.; Zinatulina, D.; Zuber, K.; Zuzel, G.

    2017-10-01

    The GERmanium Detector Array (gerda) experiment, located at the Gran Sasso underground laboratory in Italy, is one of the leading experiments for the search of 0νββ decay. In Phase II of the experiment 35.6 kg of enriched germanium detectors are operated. The application of active background rejection methods, such as a liquid argon scintillation light read-out and pulse shape discrimination of germanium detector signals, allowed to reduce the background index to the intended level of 10-3 cts/(keV.kg.yr). In the first five month of data taking 10.8 kg yr of exposure were accumulated. No signal has been found and together with data from Phase I a new limit for the neutrinoless double beta decay half-life of 76Ge of 5.3 . 1025 yr at 90% C.L. was established in June 2016. Phase II data taking is ongoing and will allow the exploration of half-lifes in the 1026 yr regime. The current status of data taking and an update on the background index are presented.

  20. Searching Neutrinoless Double Beta Decay with GERDA Phase II

    Science.gov (United States)

    Agostini, M.; Bakalyarov, A. M.; Balata, M.; Barabanov, I.; Baudis, L.; Bauer, C.; Bellotti, E.; Belogurov, S.; Bettini, A.; Bezrukov, L.; Bode, T.; Brudanin, V.; Brugnera, R.; Caldwell, A.; Cattadori, C.; Chernogorov, A.; Comellato, T.; D’Andrea, V.; Demidova, E. V.; di Marco, N.; Domula, A.; Doroshkevich, E.; Egorov, V.; Falkenstein, R.; Gangapshev, A.; Garfagnini, A.; Giordano, M.; Gooch, C.; Grabmayr, P.; Gurentsov, V.; Gusev, K.; Hahne, C.; Hakenmüller, J.; Hegai, A.; Heisel, M.; Hemmer, S.; Hiller, R.; Hofmann, W.; Holl, P.; Hult, M.; Inzhechik, L. V.; Ioannucci, L.; Csáthy, J. Janicskó; Jochum, J.; Junker, M.; Kazalov, V.; Kermaidic, Y.; Kihm, T.; Kirpichnikov, I. V.; Kirsch, A.; Kish, A.; Klimenko, A.; Kneißl, R.; Knöpfle, K. T.; Kochetov, O.; Kornoukhov, V. N.; Kuzminov, V. V.; Laubenstein, M.; Lazzaro, A.; Lindner, M.; Lippi, I.; Lubashevskiy, A.; Lubsandorzhiev, B.; Lutter, G.; Macolino, C.; Majorovits, B.; Maneschg, W.; Marissens, G.; Miloradovic, M.; Mingazheva, R.; Misiaszek, M.; Moseev, P.; Nemchenok, I.; Nisi, S.; Panas, K.; Pandola, L.; Pelczar, K.; Pullia, A.; Ransom, C.; Reissfelder, M.; Riboldi, S.; Rumyantseva, N.; Sada, C.; Sala, E.; Salamida, F.; Schmitt, C.; Schneider, B.; Schreiner, J.; Schulz, O.; Schweisshelm, B.; Schwingenheuer, B.; Schönert, S.; Schütz, A.-K.; Seitz, H.; Selivanenko, O.; Shevchik, E.; Shirchenko, M.; Simgen, H.; Smolnikov, A.; Stanco, L.; Vanhoefer, L.; Vasenko, A. A.; Veresnikova, A.; von Sturm, K.; Wagner, V.; Wegmann, A.; Wester, T.; Wiesinger, C.; Wojcik, M.; Yanovich, E.; Zhitnikov, I.; Zhukov, S. V.; Zinatulina, D.; Zschocke, A.; Zsigmond, A. J.; Zuber, K.; Zuzel, G.

    An observation of neutrinoless double beta (0νββ) decay would allow to shed light onto the nature of neutrinos. GERDA (GERmanium Detector Array) aims to discover this process in a background-free search using 76Ge. The experiment is located at the Laboratori Nazionali del Gran Sasso (LNGS) of the Istituto Nazionale di Fisica Nucleare (INFN) in Italy. Bare, isotopically enriched, high purity germanium detectors are operated in liquid argon. GERDA follows a staged approach. In Phase II 35.6 kg of enriched germanium detectors are operated since December 2015. The application of active background rejection methods, such as a liquid argon scintillation light read-out and pulse shape discrimination of germanium detector signals, allows to reduce the background index to the intended level of 10‑3 cts/(keVṡkgṡyr). No evidence for the 0νββ decay has been found in 23.2 kgṡyr of Phase II data, and together with data from Phase I the up-to-date most stringent half-life limit for this process in 76Ge has been established, at a median sensitivity of 5.8ṡ1025yr the 90% C.L. lower limit is 8.0ṡ1025yr.

  1. Soboba Community Energy Solar Project - Phase 2

    Energy Technology Data Exchange (ETDEWEB)

    Estrada, Steven [Soboba Band of Luiseno Indians, San Jacinto, CA (United States)

    2017-12-31

    This is the final technical report for the Soboba Band of Luiseno Indians' second community solar project. Since time immemorial the descendants of the Soboba people are those whom have lived on and occupied the land that is presently known as the cities of San Jacinto, Hemet, Valle Vista and Winchester. On June 19, 1883, President Chester Arthur by Executive Order established the Soboba Indian Reservation, a 3,172-acre tract which included the Soboba village and the adjacent hills. The President had limited authority as he was only able to set aside public land for the establishment of a reservation and had no authority to take private land. Thus the Soboba village; cultivated lands and major springs were part of Rancho San Jacinto Viejo and belonged to Matthew Byrne. Today the Soboba Indian Reservation lies in the lower reaches of the San Jacinto Mountains, across the San Jacinto River from the city of San Jacinto. The Soboba Band of Luiseño Indians was awarded a community solar grant through the U.S. Department of Energy. The incorporated cities of San Jacinto and Hemet, and the unincorporated community of Valle Vista border the Reservation. All three of these surrounding communities have experienced tremendous population growth over the past two decades, with slower growth during the recent economic downturn. The Tribal community that benefits from under this grant includes 1,161 enrolled members, the majority of which live on the reservation. Nearly 41% of the enrolled members are youth, age 18 and under. The elders and community leaders value preserving and maintaining the Luiseño and Cahuilla cultures and Tribal structure for future generations. The proposed project was administered from the Tribal Administration offices located on the reservation. The Soboba Tribal Government consists of five Tribal Members who are elected by the general membership to Tribal Council for a staggered two year term. The Chairman/Chairwoman is elected by a majority vote

  2. Code of Conduct for wind-power projects - Phase 3

    International Nuclear Information System (INIS)

    Strub, P.; Ziegler, Ch.

    2008-11-01

    This paper discusses the results of phase three of a project concerning wind-power projects. Feasibility and strategy aspects are examined and discussed. The current state of the wind power market is discussed on the basis of the results of a survey made on the subject. The social acceptance of wind power installations is discussed, whereby the rejection of particular projects is compared with a general lack of acceptance. Requirements placed on such projects and possible solutions are discussed. Finally, the feasibility of setting up a code of conduct in the area of wind-power projects is discussed and the definition of further instruments is examined

  3. National Skills Standards Development Program: Organization and Operation of Technical Committees To Develop National Skill Standards for Competency in the Electronics Industry. The Third Party Summative Evaluation of the Electronic Industries Foundation Project. Phase I & II. Final Report.

    Science.gov (United States)

    Losh, Charles

    The Electronics Industries Foundation was awarded a project to develop national entry-level standards and a certification system. Ten specialties were included: automotive electronics, avionics, biomedical electronics, business machines, consumer products electronics, general electronics, industrial electronics, instrumentation, microcomputer, and…

  4. The continual fuel management modification in Qinshan project II

    International Nuclear Information System (INIS)

    Ye Guodong; Pan Zefei; Zhang Xingtian

    2010-01-01

    The fuel management strategy is the basis of the nuclear power plants. The performance of the fuel management strategy affects the plants' safety and economy indicators directly. The paper summarizes all the modifications on the fuel management work in Qinshan Project II since the plant was established. It includes the surveillance system of physics tests, fetching in high performance fuel assemblies, reloading pattern optimization, and the modifications of the final safety analysis report. At the same time, it evaluates the benefit of the modifications in the few years. The experience in this paper is much helpful and could be implemented on the same type plants. (authors)

  5. Development of methods for measuring materials nuclear characteristics, Phases, I, II, II and IV

    International Nuclear Information System (INIS)

    Maglic, R.

    1963-04-01

    This report contains the following phases of the project 'measurement of nuclear characteristics of reactor materials': nuclear performances of the neutron chopper; method for measuring total effective cross sections by transmission method on the chopper; review of methods for measuring activation cross sections; measurement of neutron spectra of the RA reactor and measurement of total effective cross section of gold by using the chopper

  6. UIS Baden-Wuerttemberg. AJA project. Application of JAVA-based solutions in environment, transport and administration. Phase II 2001; UIS Baden-Wuerttemberg. Projekt AJA. Anwendung JAVA-basierter Loesungen in den Bereichen Umwelt, Verkehr und Verwaltung. Phase II 2001

    Energy Technology Data Exchange (ETDEWEB)

    Mayer-Foell, R.; Keitel, A.; Geiger, W. (eds.)

    2001-12-01

    Information and communication technology facilitates data acquisition, recording, evaluation and transmission in many fields of society, but even experts tend to get lost in the flood of data that are available. In order to make it possible to integrate new technological developments in information systems, the Minister of Environment and Transportation continues the project AJA (''Application of JAVA-based solutions'') which was started in 2000. AJA is a sequel to the GLOBUS project which was terminated in 1999. (GLOBUS - Globale Umweltsachdaten im UIS Baden-Wuerttemberg und anderen Systemen). [German] Die Bereiche Umwelt, Verkehr und Verwaltung profitieren bei der Erhebung, Erfassung, Auswertung, Darstellung und Weitergabe ihrer Daten in hohem Masse von Informations- und Kommunikationstechnik (IuK). Manche Darstellungsweisen und Berechnungen werden dadurch erst moeglich. Uebergreifende Zusammenhaenge koennen mit Hilfe der IuK aufgezeigt werden. Die Verwaltung muss Technologien einsetzen, wie sie in der Wirtschaft fuer die Zusammenfuehrung von verteilten Unternehmensdaten verwendet werden, um Entscheidungs grundlagen fuer die Unternehmenspolitik zu liefern (z.B. Data Warehouse). In solchen ''Warenhaeusern von Daten'' finden sich oft nur Experten zurecht. Unsere Herausforderung ist es, diese komplexen Zusammenhaenge nicht nur dem Experten, sondern auch dem Buerger auf moeglichst einfache und wirtschaftliche Weise zu vermitteln. Dem Buerger ist der freie Zugang zu Informationen ueber die Umwelt zu ermoeglichen. Wir sind damit auf dem Wege zu einem Marktplatz von Daten und Informationen fuer den Buerger und die Verwaltung. Um neue technologische Entwicklungen in Informationssystemen einsetzen zu koennen, fuehrt das Ministerium fuer Umwelt und Verkehr (UVM) das 2000 begonnene FuE-Vorhaben AJA ''Anwendung JAVA-basierter Loesungen'' fort. AJA baut auf dem 1999 abgeschlossenen Vorhaben GLOBUS (Globale

  7. Improved nuclear gage development - phase i and ii. Interim report

    International Nuclear Information System (INIS)

    Chan, E.L.; Champion, F.C.; Castanon, D.R.; Chang, J.C.; Hannon, J.B.

    1976-09-01

    This report contains Phase I and II of an investigation covering the design and construction of a prototype nuclear-moisture-density backscatter gage. Gage development was based upon the analysis of several factors which affect gage performance. This research indicated that the prototype gage measurements are approximately equivalent to measurements obtained by a commercial transmission gage. The implication of this research finding concerns the qualification of the backscatter test method as a valid, reliable, and expedient procedure for determining in-situ soil conditions

  8. Physics Detector Simulation Facility Phase II system software description

    International Nuclear Information System (INIS)

    Scipioni, B.; Allen, J.; Chang, C.; Huang, J.; Liu, J.; Mestad, S.; Pan, J.; Marquez, M.; Estep, P.

    1993-05-01

    This paper presents the Physics Detector Simulation Facility (PDSF) Phase II system software. A key element in the design of a distributed computing environment for the PDSF has been the separation and distribution of the major functions. The facility has been designed to support batch and interactive processing, and to incorporate the file and tape storage systems. By distributing these functions, it is often possible to provide higher throughput and resource availability. Similarly, the design is intended to exploit event-level parallelism in an open distributed environment

  9. Observed Type II supernova colours from the Carnegie Supernova Project-I

    Science.gov (United States)

    de Jaeger, T.; Anderson, J. P.; Galbany, L.; González-Gaitán, S.; Hamuy, M.; Phillips, M. M.; Stritzinger, M. D.; Contreras, C.; Folatelli, G.; Gutiérrez, C. P.; Hsiao, E. Y.; Morrell, N.; Suntzeff, N. B.; Dessart, L.; Filippenko, A. V.

    2018-06-01

    We present a study of observed Type II supernova (SN II) colours using optical/near-infrared photometric data from the Carnegie Supernovae Project-I. We analyse four colours (B - V, u - g, g - r, and g - Y) and find that SN II colour curves can be described by two linear regimes during the photospheric phase. The first (s1, colour) is steeper and has a median duration of ˜40 d. The second, shallower slope (s2, colour) lasts until the end of the `plateau' (˜80 d). The two slopes correlate in the sense that steeper initial colour curves also imply steeper colour curves at later phases. As suggested by recent studies, SNe II form a continuous population of objects from the colour point of view as well. We investigate correlations between the observed colours and a range of photometric and spectroscopic parameters including the absolute magnitude, the V-band light-curve slopes, and metal-line strengths. We find that less luminous SNe II appear redder, a trend that we argue is not driven by uncorrected host-galaxy reddening. While there is significant dispersion, we find evidence that redder SNe II (mainly at early epochs) display stronger metal-line equivalent widths. Host-galaxy reddening does not appear to be a dominant parameter, neither driving observed trends nor dominating the dispersion in observed colours. Intrinsic SN II colours are most probably dominated by photospheric temperature differences, with progenitor metallicity possibly playing a minor role. Such temperature differences could be related to differences in progenitor radius, together with the presence or absence of circumstellar material close to the progenitor stars.

  10. KIT/KPS of Qinshan phase-II and a discussion on integrated information management and automatic control

    International Nuclear Information System (INIS)

    Yan Changhui

    2001-01-01

    Centralized Data Processing and Safety Panel (KIT/KPS) of Qinshan Phase-II power project is described, and the necessity and engineering scheme is presented of integrated information management and automatic control that would achieve in power plant according to the technology scheme and technology trait of KIT/KPS

  11. FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2

    International Nuclear Information System (INIS)

    1991-02-01

    Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes ''end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made

  12. [Fungal community structure in phase II composting of Volvariella volvacea].

    Science.gov (United States)

    Chen, Changqing; Li, Tong; Jiang, Yun; Li, Yu

    2014-12-04

    To understand the fungal community succession during the phase II of Volvariella volvacea compost and clarify the predominant fungi in different fermentation stages, to monitor the dynamic compost at the molecular level accurately and quickly, and reveal the mechanism. The 18S rDNA-denaturing gradient gel electrophoresis (DGGE) and sequencing methods were used to analyze the fungal community structure during the course of compost. The DGGE profile shows that there were differences in the diversity of fungal community with the fermentation progress. The diversity was higher in the stages of high temperature. And the dynamic changes of predominant community and relative intensity was observed. Among the 20 predominant clone strains, 9 were unknown eukaryote and fungi, the others were Eurotiales, Aspergillus sp., Melanocarpus albomyces, Colletotrichum sp., Rhizomucor sp., Verticillium sp., Penicillium commune, Microascus trigonosporus and Trichosporon lactis. The 14 clone strains were detected in the stages of high and durative temperature. The fungal community structure and predominant community have taken dynamic succession during the phase II of Volvariella volvacea compost.

  13. Decontamination and decommissioning project status of the TRIGA Mark II and III in Korea

    International Nuclear Information System (INIS)

    Paik, S.T.; Park, S.K.; Chung, K.W.; Chung, U.S.; Jung, K.J.

    1999-01-01

    TRIGA Mark-II, the first research reactor in Korea, has operated since 1962, and the second one, TRIGA Mark-III since 1972. Both of them had their operation phased out in 1995 due to their lives and operation of the new research reactor, HANARO (High-flux Advanced Neutron Application Reactor) at the Korea Atomic Energy Institute (KAERI) in Taejon. Decontamination and decommissioning (D and D) project of TRIGA Mark-II and Mark-III was started in January 1997 and will be completed in December 2002. The first year of the project, work was performed in preparation of the decommissioning plan, start of the environmental impact assessment and setup licensing procedure and documentation for the project with cooperation of Korea Institute of Nuclear Safety (KINS). Hyundai Engineering Company (HEC) is the main contractor to do design and licensing documentation for the D and D of both reactors. British Nuclear Fuels plc (BNFL) is the technical assisting partner of HEC. The decommissioning plan document was submitted to the Ministry of Since and Technology (MOST) for the decommissioning license in December 1998, and it expecting to be issued a license in mid 1999. The goal of this project is to release the reactor site and buildings as an unrestricted area. This paper summarizes current status and future plan for the D and D project. (author)

  14. DECOVALEX II PROJECT Technical Report - Task 2C

    International Nuclear Information System (INIS)

    Jing, L.; Stephansson, O.; Chijimatzu, M.; Tsang, C.F.

    1999-05-01

    The DECOVALEX II project is an international co-operative research project supported by a number of national radioactive waste management organizations of different countries. The project studied four tasks: Task 1: numerical simulation of the RCF3 pump test at Sellafield, UK; Task 2: numerical simulation of the in situ T-H-M experiment at Kamaishi Mine, Japan; Task 3: monitoring of current development in rock fracture research; and Task 4: report on treatment of T-H-M processes in Performance Assessment works for nuclear waste repositories. The project started in 1995 and is scheduled to be finalised in March, 1999. This report concerns the Task 2 of the DECOVALEX H project. Task 2 of the DECOVALEX II project is the numerical modelling of the in-situ T-H-M experiment of a fractured rock - buffer - heater system at Kamaishi Mine, Japan. The experiment was carried out inside a test pit drilled in the floor of a 5 x 7 m alcove excavated near an existing drift at the 550 m level. The test pit has a circular cross section of diameter 1.7 m and a depth of 5 m, filled with bentonite which contains an electric heater. Four research teams studied Task 2 with different computational models. The task is divided into three sub-tasks: Task 2A, Task 2B and Task 2C. Task 2A was defined as a blind prediction to the coupled hydro-mechanical behaviour of the fractured rocks due to the excavation of the test pit. The calibration of the numerical models against measured results of pore pressures, flow rates and rock deformation before filling up of the test pit formed Task 2B. These two sub-tasks were performed to establish well calibrated fields of hydraulic conductivity and mechanical deformability of the fractured rocks at the test site. They were necessary for further simulations on interactions between the rock and buffer materials during heating experiments, as required for Task 2C, with a higher level of confidence on rock mass models. Presented in this report is the

  15. DECOVALEX II PROJECT Technical Report - Task 2C

    Energy Technology Data Exchange (ETDEWEB)

    Jing, L.; Stephansson, O. [Royal Inst. of Tech., Stockholm (Sweden). Dept. of Civil and Environmental Engineering; Boergesson, L. [Clay Technology AB, IDEON Research Center, Lund (Sweden); Chijimatzu, M. [Japan Nuclear Cycle Development Inst., Ibaraki (Japan). Waste Management and Fuel Cycle Research Center; Kautsky, F. [Swedish Nuclear Power Inspectorate (SKI), Stockholm (Sweden); Tsang, C.F. [Lawrence Berkeley National Laboratory, Berkeley, CA (United States). Earth Science Div.

    1999-05-01

    The DECOVALEX II project is an international co-operative research project supported by a number of national radioactive waste management organizations of different countries. The project studied four tasks: Task 1: numerical simulation of the RCF3 pump test at Sellafield, UK; Task 2: numerical simulation of the in situ T-H-M experiment at Kamaishi Mine, Japan; Task 3: monitoring of current development in rock fracture research; and Task 4: report on treatment ofT-H-M processes in Performance Assessment works for nuclear waste repositories. The project started in 1995 and is scheduled to be finalised in March, 1999. This report concerns the Task 2 of the DECOVALEX H project. Task 2 of the DECOVALEX II project is the numerical modelling of the in-situ T-H-M experiment of a fractured rock - buffer - heater system at Kamaishi Mine, Japan. The experiment was carried out inside a test pit drilled in the floor of a 5 x 7 m alcove excavated near an existing drift at the 550 m level. The test pit has a circular cross section of diameter 1.7 m and a depth of 5 m, filled with bentonite which contains an electric heater. Four research teams studied Task 2 with different computational models. The task is divided into three sub-tasks: Task 2A, Task 2B and Task 2C. Task 2A was defined as a blind prediction to the coupled hydro-mechanical behaviour of the fractured rocks due to the excavation of the test pit. The calibration of the numerical models against measured results of pore pressures, flow rates and rock deformation before filling up of the test pit formed Task 2B. These two sub-tasks were performed to establish well calibrated fields of hydraulic conductivity and mechanical deformability of the fractured rocks at the test site. They were necessary for further simulations on interactions between the rock and buffer materials during heating experiments, as required for Task 2C, with a higher level of confidence on rock mass models. Presented in this report is the definition

  16. Single Photon Sensitive HgCdTe Avalanche Photodiode Detector (APD), Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Leveraging Phase I SBIR successes, in Phase II, a single photon sensitive LIDAR receiver will be fabricated and delivered to NASA. In Phase I, high-gain,...

  17. Integrated Monitoring and Surveillance System demonstration project. Phase 2 accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Singleterry, R.C.

    1997-01-01

    The paper presents the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase 2 efforts. the rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include further development of the data acquisition system and procurement of necessary hardware/software, options and associated costs for plutonium canning systems and gloveboxes, initiation of facility modifications, determination of possibly affected facility documentation, results from sensor system trade study, and preliminary storage configuration designs. Resources invested during Phase 1 and Phase 2 are summarized and budgetary requirements for completion of Phase 3 presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase 2 deliverables

  18. NASA SBIR abstracts of 1991 phase 1 projects

    Science.gov (United States)

    Schwenk, F. Carl; Gilman, J. A.; Paige, J. B.

    1992-01-01

    The objectives of 301 projects placed under contract by the Small Business Innovation Research (SBIR) program of the National Aeronautics and Space Administration (NASA) are described. These projects were selected competitively from among proposals submitted to NASA in response to the 1991 SBIR Program Solicitation. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 301, in order of its appearance in the body of the report. Appendixes to provide additional information about the SBIR program and permit cross-reference of the 1991 Phase 1 projects by company name, location by state, principal investigator, NASA Field Center responsible for management of each project, and NASA contract number are included.

  19. NASA SBIR abstracts of 1992, phase 1 projects

    Science.gov (United States)

    Schwenk, F. C.; Gilman, J. A.; Paige, J. B.; Sacknoff, S. M.

    1993-01-01

    The objectives of 346 projects placed under contract by the Small Business Innovation Research (SBIR) program of the National Aeronautics and Space Administration (NASA) are described. These projects were selected competitively from among proposals submitted to NASA in response to the 1992 SBIR Program Solicitation. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 346, in order of its appearance in the body of the report. Appendixes to provide additional information about the SBIR program and permit cross-reference of the 1992 Phase 1 projects by company name, location by state, principal investigator, NASA Field Center responsible for management of each project, and NASA contract number are included.

  20. NASA's GeneLab Phase II: Federated Search and Data Discovery

    Science.gov (United States)

    Berrios, Daniel C.; Costes, Sylvain V.; Tran, Peter B.

    2017-01-01

    GeneLab is currently being developed by NASA to accelerate 'open science' biomedical research in support of the human exploration of space and the improvement of life on earth. Phase I of the four-phase GeneLab Data Systems (GLDS) project emphasized capabilities for submission, curation, search, and retrieval of genomics, transcriptomics and proteomics ('omics') data from biomedical research of space environments. The focus of development of the GLDS for Phase II has been federated data search for and retrieval of these kinds of data across other open-access systems, so that users are able to conduct biological meta-investigations using data from a variety of sources. Such meta-investigations are key to corroborating findings from many kinds of assays and translating them into systems biology knowledge and, eventually, therapeutics.

  1. NASAs GeneLab Phase II: Federated Search and Data Discovery

    Science.gov (United States)

    Berrios, Daniel C.; Costes, Sylvain; Tran, Peter

    2017-01-01

    GeneLab is currently being developed by NASA to accelerate open science biomedical research in support of the human exploration of space and the improvement of life on earth. Phase I of the four-phase GeneLab Data Systems (GLDS) project emphasized capabilities for submission, curation, search, and retrieval of genomics, transcriptomics and proteomics (omics) data from biomedical research of space environments. The focus of development of the GLDS for Phase II has been federated data search for and retrieval of these kinds of data across other open-access systems, so that users are able to conduct biological meta-investigations using data from a variety of sources. Such meta-investigations are key to corroborating findings from many kinds of assays and translating them into systems biology knowledge and, eventually, therapeutics.

  2. FEBEX II Project Post-mortem analysis EDZ assessment

    International Nuclear Information System (INIS)

    Bazargan Sabet, B.; Shao, H.; Autio, J.; Elorza, F. J.

    2004-01-01

    Within the framework of the FEBEX II project a multidisciplinary team studied the mechanisms of creation of the potential damaged zone around the test drift. The research program includes laboratory and in situ investigations as well as the numerical modelling of the observed phenomena. Where laboratory investigations are concerned, the 14C-PMMA technique was applied to study the spatial distribution of porosity in the samples taken from the test drift wall. In addition complementary microscopy and scanning electron microscopy (SEM) studies were performed to make qualitative investigations on the pore apertures and minerals in porous regions. The results obtained with the PMMA method have not shown any clear increased porosity zone adjacent to the tunnel wall. The total porosity of the samples varied between 0.6-1.2%. The samples of unplugged region did not differ from the samples of plugged region. A clear increase in porosity to depths of 10-15 mm from the tunnel wall was detected in lamprophyre samples. According to the SEM/EDX analyses the excavation-disturbed zone in the granite matrix extended to depths of 1-3 mm from the wall surface. A few quartz grains were crushed and some micro fractures were found. Gas permeability tests were carried out on two hollow cylinder samples of about 1m long each taken on the granite wall perpendicular to the drift axis. The first sample was cored in the service area far from the heated zone and the second one at the level of the heater. The tests were performed at constant gas pressure by setting a steady state radial flow through a section of 1cm wide isolated by means of four mini-packers. The profile of the gas permeability according to the core length has been established. The results obtained for both considered samples have shown permeability ranging between 3.5 10-18 and 8.4 10-19m2, pointing out the absence of a marked damage. Acoustic investigations have been carried out with the objective of quantifying the

  3. FEBEX II Project Post-mortem analysis EDZ assessment

    Energy Technology Data Exchange (ETDEWEB)

    Bazargan Sabet, B.; Shao, H.; Autio, J.; Elorza, F. J.

    2004-07-01

    Within the framework of the FEBEX II project a multidisciplinary team studied the mechanisms of creation of the potential damaged zone around the test drift. The research program includes laboratory and in situ investigations as well as the numerical modelling of the observed phenomena. Where laboratory investigations are concerned, the 14C-PMMA technique was applied to study the spatial distribution of porosity in the samples taken from the test drift wall. In addition complementary microscopy and scanning electron microscopy (SEM) studies were performed to make qualitative investigations on the pore apertures and minerals in porous regions. The results obtained with the PMMA method have not shown any clear increased porosity zone adjacent to the tunnel wall. The total porosity of the samples varied between 0.6-1.2%. The samples of unplugged region did not differ from the samples of plugged region. A clear increase in porosity to depths of 10-15 mm from the tunnel wall was detected in lamprophyre samples. According to the SEM/EDX analyses the excavation-disturbed zone in the granite matrix extended to depths of 1-3 mm from the wall surface. A few quartz grains were crushed and some micro fractures were found. Gas permeability tests were carried out on two hollow cylinder samples of about 1m long each taken on the granite wall perpendicular to the drift axis. The first sample was cored in the service area far from the heated zone and the second one at the level of the heater. The tests were performed at constant gas pressure by setting a steady state radial flow through a section of 1cm wide isolated by means of four mini-packers. The profile of the gas permeability according to the core length has been established. The results obtained for both considered samples have shown permeability ranging between 3.5 10-18 and 8.4 10-19m2, pointing out the absence of a marked damage. Acoustic investigations have been carried out with the objective of quantifying the

  4. Pipe Overpack Container Fire Testing: Phase I II & III.

    Energy Technology Data Exchange (ETDEWEB)

    Figueroa, Victor G. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Ammerman, Douglas J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Lopez, Carlos [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gill, Walter [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2018-02-01

    The Pipe Overpack Container (POC) was developed at Rocky Flats to transport plutonium residues with higher levels of plutonium than standard transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP) for disposal. In 1996 Sandia National Laboratories (SNL) conducted a series of tests to determine the degree of protection POCs provided during storage accident events. One of these tests exposed four of the POCs to a 30-minute engulfing pool fire, resulting in one of the 7A drum overpacks generating sufficient internal pressure to pop off its lid and expose the top of the pipe container (PC) to the fire environment. The initial contents of the POCs were inert materials, which would not generate large internal pressure within the PC if heated. POCs are now being used to store combustible TRU waste at Department of Energy (DOE) sites. At the request of DOE’s Office of Environmental Management (EM) and National Nuclear Security Administration (NNSA), starting in 2015 SNL conducted a series of fire tests to examine whether PCs with combustibles would reach a temperature that would result in (1) decomposition of inner contents and (2) subsequent generation of sufficient gas to cause the PC to over-pressurize and release its inner content. Tests conducted during 2015 and 2016 were done in three phases. The goal of the first phase was to see if the PC would reach high enough temperatures to decompose typical combustible materials inside the PC. The goal of the second test phase was to determine under what heating loads (i.e., incident heat fluxes) the 7A drum lid pops off from the POC drum. The goal of the third phase was to see if surrogate aerosol gets released from the PC when the drum lid is off. This report will describe the various tests conducted in phase I, II, and III, present preliminary results from these tests, and discuss implications for the POCs.

  5. Performance of the Tile PreProcessor Demonstrator for the ATLAS Tile Calorimeter Phase II Upgrade

    OpenAIRE

    Carrio Argos, Fernando; Valero, Alberto

    2015-01-01

    The Tile Calorimeter PreProcessor (TilePPr) demonstrator is a high performance double AMC board based on FPGA resources and QSFP modules. This board has been designed in the framework of the ATLAS Tile Calorimeter (TileCal) Demonstrator Project for the Phase II Upgrade as the first stage of the back-end electronics. The TilePPr demonstrator has been conceived for receiving and processing the data coming from the front-end electronics of the TileCal Demonstrator module, as well as for configur...

  6. Product-Improvement Test (Phase II), Jetcal Tester, Model H119A.

    Science.gov (United States)

    1969-03-05

    Ao—A0 51 113 ARMY AVIATION ‘Cs’ BOARD FORT tUCKER ALA — P*OOUCTeII ROVEMCNT TEST ( FHAS ~ I I ) . JETCAL TESTER, MODEL M119A~~’ETC(U) MAR S9...Phase i i ) , Jetcal Tester , Model H 119A , USATECOM Project No. 4-6-5011-03 b . No fur ther consideration be given to the TEMPCAL heater probe as a...essen t i a l component of the Jetcal Tester. e. The service manual instruct ions for con t inu i ty te s t ing of EG1 thermocouples be revised to

  7. Implementation of neutron phase contrast imaging at FRM-II

    Energy Technology Data Exchange (ETDEWEB)

    Lorenz, Klaus

    2008-11-12

    At ANTARES, the beam line for neutron imaging at the Forschungsneutronenquelle Heinz Maier-Leibnitz (FRM-II) in Garching, the option to do phase contrast imaging besides conventional absorption based neutron imaging was implemented and successfully used for the non-destructive testing of various types of objects. The used propagation-based technique is based on the interference of neutron waves in the detector plane that were differently strong diffracted by the sample. A comparison with other phase-sensitive neutron imaging techniques highlights assets and drawbacks of the different methods. In preliminary measurements at ANTARES and the spallation source SINQ at PSI in Villigen, the influence of the beam geometry, the neutron spectrum and the detector on the quality of the phase contrast measurements were investigated systematically. It was demonstrated that gamma radiation and epithermal neutrons in the beam contribute severely to background noise in measurements, which motivated the installation of a remotely controlled filter wheel for a quick and precise positioning of different crystal filters in the beam. By the installation of a similar aperture wheel, a quick change between eight different beam geometries was made possible. Besides pinhole and slit apertures, coded apertures based on non redundant arrays were investigated. The possibilities, which arise by the exploitation of the real part of the refractive index in neutron imaging, were demonstrated in experiments with especially designed test samples and in measurements with ordinary, industrial components. (orig.)

  8. Implementation of neutron phase contrast imaging at FRM-II

    International Nuclear Information System (INIS)

    Lorenz, Klaus

    2008-01-01

    At ANTARES, the beam line for neutron imaging at the Forschungsneutronenquelle Heinz Maier-Leibnitz (FRM-II) in Garching, the option to do phase contrast imaging besides conventional absorption based neutron imaging was implemented and successfully used for the non-destructive testing of various types of objects. The used propagation-based technique is based on the interference of neutron waves in the detector plane that were differently strong diffracted by the sample. A comparison with other phase-sensitive neutron imaging techniques highlights assets and drawbacks of the different methods. In preliminary measurements at ANTARES and the spallation source SINQ at PSI in Villigen, the influence of the beam geometry, the neutron spectrum and the detector on the quality of the phase contrast measurements were investigated systematically. It was demonstrated that gamma radiation and epithermal neutrons in the beam contribute severely to background noise in measurements, which motivated the installation of a remotely controlled filter wheel for a quick and precise positioning of different crystal filters in the beam. By the installation of a similar aperture wheel, a quick change between eight different beam geometries was made possible. Besides pinhole and slit apertures, coded apertures based on non redundant arrays were investigated. The possibilities, which arise by the exploitation of the real part of the refractive index in neutron imaging, were demonstrated in experiments with especially designed test samples and in measurements with ordinary, industrial components. (orig.)

  9. Projective limits of state spaces II. Quantum formalism

    Science.gov (United States)

    Lanéry, Suzanne; Thiemann, Thomas

    2017-06-01

    In this series of papers, we investigate the projective framework initiated by Kijowski (1977) and Okołów (2009, 2014, 2013), which describes the states of a quantum theory as projective families of density matrices. A short reading guide to the series can be found in Lanéry (2016). After discussing the formalism at the classical level in a first paper (Lanéry, 2017), the present second paper is devoted to the quantum theory. In particular, we inspect in detail how such quantum projective state spaces relate to inductive limit Hilbert spaces and to infinite tensor product constructions (Lanéry, 2016, subsection 3.1) [1]. Regarding the quantization of classical projective structures into quantum ones, we extend the results by Okołów (2013), that were set up in the context of linear configuration spaces, to configuration spaces given by simply-connected Lie groups, and to holomorphic quantization of complex phase spaces (Lanéry, 2016, subsection 2.2) [1].

  10. The PEP-II/BaBar Project-Wide Database using World Wide Web and Oracle*Case

    International Nuclear Information System (INIS)

    Chan, A.; Crane, G.; MacGregor, I.; Meyer, S.

    1995-12-01

    The PEP-II/BaBar Project Database is a tool for monitoring the technical and documentation aspects of the accelerator and detector construction. It holds the PEP-II/BaBar design specifications, fabrication and installation data in one integrated system. Key pieces of the database include the machine parameter list, components fabrication and calibration data, survey and alignment data, property control, CAD drawings, publications and documentation. This central Oracle database on a UNIX server is built using Oracle*Case tools. Users at the collaborating laboratories mainly access the data using World Wide Web (WWW). The Project Database is being extended to link to legacy databases required for the operations phase

  11. Final report on Phase II remedial action at the former Middlesex Sampling Plant and associated properties. Volume 2

    International Nuclear Information System (INIS)

    1985-04-01

    Volume 2 presents the radiological measurement data taken after remedial action on properties surrounding the former Middlesex Sampling Plant during Phase II of the DOE Middlesex Remedial Action Program. Also included are analyses of the confirmatory radiological survey data for each parcel with respect to the remedial action criteria established by DOE for the Phase II cleanup and a discussion of the final status of each property. Engineering details of this project and a description of the associated health physics and environmental monitoring activities are presented in Volume 1

  12. Improving Climate Projections by Understanding How Cloud Phase affects Radiation

    Science.gov (United States)

    Cesana, Gregory; Storelvmo, Trude

    2017-01-01

    Whether a cloud is predominantly water or ice strongly influences interactions between clouds and radiation coming down from the Sun or up from the Earth. Being able to simulate cloud phase transitions accurately in climate models based on observational data sets is critical in order to improve confidence in climate projections, because this uncertainty contributes greatly to the overall uncertainty associated with cloud-climate feedbacks. Ultimately, it translates into uncertainties in Earth's sensitivity to higher CO2 levels. While a lot of effort has recently been made toward constraining cloud phase in climate models, more remains to be done to document the radiative properties of clouds according to their phase. Here we discuss the added value of a new satellite data set that advances the field by providing estimates of the cloud radiative effect as a function of cloud phase and the implications for climate projections.

  13. Pipe Overpack Container Fire Testing: Phase I & II

    Energy Technology Data Exchange (ETDEWEB)

    Figueroa, Victor G. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Ammerman, Douglas J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Lopez, Carlos [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Gill, Walter [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-05-01

    The Pipe Overpack Container (POC) was developed at Rocky Flats to transport plutonium residues with higher levels of plutonium than standard transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP) for disposal. In 1996 Sandia National Laboratories (SNL) conducted a series of tests to determine the degree of protection POCs provided during storage accident events. One of these tests exposed four of the POCs to a 30-minute engulfing pool fire, resulting in one of the 7A drum overpacks generating sufficient internal pressure to pop off its lid and expose the top of the pipe container (PC) to the fire environment. The initial contents of the POCs were inert materials, which would not generate large internal pressure within the PC if heated. However, POCs are now being used to store combustible TRU waste at Department of Energy (DOE) sites. At the request of DOE’s Office of Environmental Management (EM) and National Nuclear Security Administration (NNSA), starting in 2015 SNL conducted a new series of fire tests to examine whether PCs with combustibles would reach a temperature that would result in (1) decomposition of inner contents and (2) subsequent generation of sufficient gas to cause the PC to over-pressurize and release its inner content. Tests conducted during 2015 and 2016, and described herein, were done in two phases. The goal of the first phase was to see if the PC would reach high enough temperatures to decompose typical combustible materials inside the PC. The goal of the second test phase was to determine under what heating loads (i.e., incident heat fluxes) the 7A drum lid pops off from the POC drum. This report will describe the various tests conducted in phase I and II, present preliminary results from these tests, and discuss implications for the POCs.

  14. Lunar Quest in Second Life, Lunar Exploration Island, Phase II

    Science.gov (United States)

    Ireton, F. M.; Day, B. H.; Mitchell, B.; Hsu, B. C.

    2010-12-01

    Linden Lab’s Second Life is a virtual 3D metaverse created by users. At any one time there may be 40,000-50,000 users on line. Users develop a persona and are seen on screen as a human figure or avatar. Avatars move through Second Life by walking, flying, or teleporting. Users form communities or groups of mutual interest such as music, computer graphics, and education. These groups communicate via e-mail, voice, and text within Second Life. Information on downloading the Second Life browser and joining can be found on the Second Life website: www.secondlife.com. This poster details Phase II in the development of Lunar Exploration Island (LEI) located in Second Life. Phase I LEI highlighted NASA’s LRO/LCROSS mission. Avatars enter LEI via teleportation arriving at a hall of flight housing interactive exhibits on the LRO/ LCROSS missions including full size models of the two spacecraft and launch vehicle. Storyboards with information about the missions interpret the exhibits while links to external websites provide further information on the mission, both spacecraft’s instrument suites, and related EPO. Other lunar related activities such as My Moon and NLSI EPO programs. A special exhibit was designed for International Observe the Moon Night activities with links to websites for further information. The sim includes several sites for meetings, a conference stage to host talks, and a screen for viewing NASATV coverage of mission and other televised events. In Phase II exhibits are updated to reflect on-going lunar exploration highlights, discoveries, and future missions. A new section of LEI has been developed to showcase NASA’s Lunar Quest program. A new exhibit hall with Lunar Quest information has been designed and is being populated with Lunar Quest information, spacecraft models (LADEE is in place) and kiosks. A two stage interactive demonstration illustrates lunar phases with static and 3-D stations. As NASA’s Lunar Quest program matures further

  15. Small Business Innovation Research. Abstracts of Phase II awards, 2000

    Energy Technology Data Exchange (ETDEWEB)

    None

    2000-12-01

    The SBIR program enables DOE to obtain effective, innovative solutions to important problems through the private sector, which has a commercial incentive to pursue the resulting technology and bring it to the marketplace. The growing number of awardees, many of them started in business in response to SBIR solicitations, is becoming a significant resource for the solution of high risk, high technology problems for the Department. As detailed below, this publication describes the technical efforts and commercialization possibilities for SBIR Phase II awards in Fiscal Year (FY) 2000. It is intended for the educated layman, and maybe of particular interest to potential investors who wish to get in on the ground floor of exciting opportunities.

  16. Phase 1 of the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    1991-08-01

    The work described in this report was prompted by the public's concern about potential effect from the radioactive materials released from the Hanford Site. The Hanford Environmental Dose Reconstruction (HEDR) Project was established to estimate radiation dose the public might have received from the Hanford Site since 1944, when facilities began operating. Phase 1 of the HEDR Project is a ''pilot'' or ''demonstration'' phase. The objectives of this initial phase were to determine whether enough historical information could be found or reconstructed to be used for dose estimation and develop and test conceptual and computational models for calculating credible dose estimates. Preliminary estimates of radiation doses were produced in Phase 1 because they are needed to achieve these objectives. The reader is cautioned that the dose estimates provided in this and other Phase 1 HEDR reports are preliminary. As the HEDR Project continues, the dose estimates will change for at least three reasons: more complete input information for models will be developed; the models themselves will be refined; and the size and shape of the geographic study area will change. This is one of three draft reports that summarize the first phase of the four-phased HEDR Project. This, the Summary Report, is directed to readers who want a general understanding of the Phase 1 work and preliminary dose estimates. The two other reports -- the Air Pathway Report and the Columbia River Pathway Report -- are for readers who understand the radiation dose assessment process and want to see more technical detail. Detailed descriptions of the dose reconstruction process are available in more than 20 supporting reports listed in Appendix A. 32 refs., 46 figs

  17. The NEA Forum on Stakeholder Confidence - Phase I Lessons and Phase II Activities

    Energy Technology Data Exchange (ETDEWEB)

    Brown, Peter [Natural Resources Canada, Ottawa (Canada). Uranium and Radioactive Waste Div.; Pescatore, Claudio [Nuclear Energy Agency, Paris (France)

    2006-09-15

    The Forum on Stakeholder Confidence (FSC) was created under a mandate from the OECD Nuclear Energy Agency (NEA) Radioactive Waste Management Committee (RWMC) to facilitate the sharing of international experience in addressing the societal dimension of radioactive waste management. It explores means of ensuring an effective dialogue with the public, and considers ways to strengthen confidence in decision-making processes. The Forum was launched in August 2000 and completed its first phase in 00 . Major findings and principles for action were published under the title of 'Learning and Adapting to Societal Requirements'. Activities of the FSC were also reported at Valdor 2003. In the second mandate of the FSC, there is continued use of a variety of tools and formats to allow dialogue among stakeholders in an atmosphere of mutual trust: national workshops and community visits, topical sessions, and desk and interview studies. In Phase II, the FSC is exploring: the link between research, development and demonstration and stakeholder confidence; cultural and organisational changes in RWM institutions; the role of media relations and outreach opportunities; tools and processes to help society prepare and manage decisions through stakeholder involvement; and increasing the value of waste management facilities to local communities. Workshops have been held in Germany and Spain. A large set of publications makes both Phase I and Phase II findings widely available.

  18. The NEA Forum on Stakeholder Confidence - Phase I Lessons and Phase II Activities

    International Nuclear Information System (INIS)

    Brown, Peter

    2006-01-01

    The Forum on Stakeholder Confidence (FSC) was created under a mandate from the OECD Nuclear Energy Agency (NEA) Radioactive Waste Management Committee (RWMC) to facilitate the sharing of international experience in addressing the societal dimension of radioactive waste management. It explores means of ensuring an effective dialogue with the public, and considers ways to strengthen confidence in decision-making processes. The Forum was launched in August 2000 and completed its first phase in 00 . Major findings and principles for action were published under the title of 'Learning and Adapting to Societal Requirements'. Activities of the FSC were also reported at Valdor 2003. In the second mandate of the FSC, there is continued use of a variety of tools and formats to allow dialogue among stakeholders in an atmosphere of mutual trust: national workshops and community visits, topical sessions, and desk and interview studies. In Phase II, the FSC is exploring: the link between research, development and demonstration and stakeholder confidence; cultural and organisational changes in RWM institutions; the role of media relations and outreach opportunities; tools and processes to help society prepare and manage decisions through stakeholder involvement; and increasing the value of waste management facilities to local communities. Workshops have been held in Germany and Spain. A large set of publications makes both Phase I and Phase II findings widely available

  19. Phase I Report, US DOE GRED II Program

    Energy Technology Data Exchange (ETDEWEB)

    Fairbank Engineering Ltd.

    2003-04-23

    Noramex Corporation Inc, a Nevada company, owns a 100% interest in geothermal leases at the Blue Mountain Geothermal Area, Humboldt County, Nevada. The company is exploring the site for a geothermal resource suitable for development for electric power generation or In the spring of 2002, Noramex drilled the first geothermal observation hole at Blue Mountain, under a cost-share program with the U.S Department of Energy (DOE), under the DOE's Geothermal Exploration and Resource Definition (GRED) program, (Cooperative Agreement No. DE-FC04-00AL66972). DEEP BLUE No.1 was drilled to a total depth of 672.1 meters (2205 feet) and recorded a maximum temperature of 144.7 C (292.5 F). Noramex Corporation will now drill a second slim geothermal observation test hole at Blue Mountain, designated DEEP BLUE No.2. The hole will be drilled under a cost-share program with the DOE, under the DOE's Geothermal Exploration and Resource Definition II (GRED II) program, (Cooperative Agreement No. DE-FC04-2002AL68297). This report comprises Phase I of Cooperative Agreement No. DE-FC04-2002AL68297 of the GRED II program. The report provides an update on the status of resource confirmation at the Blue Mountain Geothermal Area, incorporating the results from DEEP BLUE No.1, and provides the technical background for a second test hole. The report also outlines the proposed drilling program for slim geothermal observation test hole DEEP BLUE No.2.

  20. The PEP-II Project: Low-Energy Ring Design and Project Status

    International Nuclear Information System (INIS)

    Zisman, Michael S.

    2006-01-01

    We describe the present status of the PEP-II project. The project comprises four major systems: Injector, High-Energy Ring (HER), Low-Energy Ring (LER), and Interaction Region (IR). We focus in detail on the design of the LER, as its parameters and requirements are most closely related to those required for the Beijing Tau-Charm Factory rings. The PEP-II LER is a high-current, 3.1-GeV positron ring mounted above the 9-GeV HER. The LER uses a wiggler located in one of its six straight sections to provide emittance control and additional damping. We describe the rather complicated IR, which must transport the LER beam into the plane of the HER, focus it to a common beam size, and separate the beams after the head-on collisions. Both permanent magnet and conventional electromagnets are used in this area. The LER lattice has now adopted a simplified non-interleaved sextupole correction scheme that has reduced the required number of sextupoles substantially. We describe the LER vacuum system, one of the most challenging subsystems in PEP-II. It employs several technologies. In the arcs, aluminum extrusions and titanium sublimation pumps are employed; the straight sections use stainless steel chambers with lumped ion pumps. In the wiggler area, an extended copper photon dump with nonevaporable getter (NEG) pumps is employed to handle the very large synchrotron radiation power. The design of the room-temperature RF system, the bunch-by-bunch longitudinal and transverse feedback systems, and some of the special diagnostics will be described briefly. The PEP-II project remains on schedule to begin commissioning of the HER in April 1997, followed by the LER a year later

  1. Technical Analysis of the Hydrogen Energy Station Concept, Phase I and Phase II

    Energy Technology Data Exchange (ETDEWEB)

    TIAX, LLC

    2005-05-04

    Phase I Due to the growing interest in establishing a domestic hydrogen infrastructure, several hydrogen fueling stations already have been established around the country as demonstration units. While these stations help build familiarity with hydrogen fuel in their respective communities, hydrogen vehicles are still several years from mass production. This limited number of hydrogen vehicles translates to a limited demand for hydrogen fuel, a significant hurdle for the near-term establishment of commercially viable hydrogen fueling stations. By incorporating a fuel cell and cogeneration system with a hydrogen fueling station, the resulting energy station can compensate for low hydrogen demand by providing both hydrogen dispensing and combined heat and power (CHP) generation. The electrical power generated by the energy station can be fed back into the power grid or a nearby facility, which in turn helps offset station costs. Hydrogen production capacity not used by vehicles can be used to support building heat and power loads. In this way, an energy station can experience greater station utility while more rapidly recovering capital costs, providing an increased market potential relative to a hydrogen fueling station. At an energy station, hydrogen is generated on-site. Part of the hydrogen is used for vehicle refueling and part of the hydrogen is consumed by a fuel cell. As the fuel cell generates electricity and sends it to the power grid, excess heat is reclaimed through a cogeneration system for use in a nearby facility. Both the electrical generation and heat reclamation serve to offset the cost of purchasing the equivalent amount of energy for nearby facilities and the energy station itself. This two-phase project assessed the costs and feasibility of developing a hydrogen vehicle fueling station in conjunction with electricity and cogenerative heat generation for nearby Federal buildings. In order to determine which system configurations and operational

  2. Horonobe Underground Research Laboratory project. Synthesis of phase I investigation 2001-2005. Volume 'geoscientific research'

    International Nuclear Information System (INIS)

    Ota, Kunio; Abe, Hironobu; Kunimaru, Takanori

    2011-03-01

    The Horonobe Underground Research Laboratory (URL) Project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment within the host sedimentary formations at Horonobe in Hokkaido, northern Japan. The project consists of two major research areas, 'Geoscientific Research' and 'R and D on Geological Disposal', and proceeds in three overlapping phases, 'Phase I: Surface-based investigation', 'Phase II: Construction' and 'Phase III: Operation', over a period of 20 years. The present report summarises the results of the Phase I geoscientific research carried out from March 2001 to March 2005. Integration of the results from different disciplines ensures that the Phase I goals have been successfully achieved and identifies key issues that need to be addressed in Phases II and III. More importantly, efforts are made to summarise as many lessons learnt from the Phase I investigations and other technical achievements as possible to form a 'knowledge base' that will reinforce the technical basis for both implementation and the formulation of safety regulations. Based on experiences of selecting the URL area and site in Horonobe Town, important factors that should be taken into consideration in such selection processes and their rationale are demonstrated. In the course of stepwise surface-based investigations, a number of achievements have been made, which can eventually provide examples of integrated methodologies for characterising the sedimentary formations. The relevant surface-based investigation techniques have thus been further developed. The Horonobe URL has been designed based on geoscientific information accumulated during the surface-based investigations and the plans for safe construction and operation of the URL have been defined in a feasible manner. In addition, a variety of environmental measures taken during Phase I have proved to be

  3. The international INTRAVAL project. Phase 2, Summary report

    International Nuclear Information System (INIS)

    Larsson, A.; Pers, K.; Skagius, K.; Dverstorp, B.

    1997-01-01

    The international project INTRAVAL addresses the validation of models of transport of radionuclides through groundwater in the geosphere. Such models are used in the assessment of the long-term safety of radioactive waste disposal systems. The second phase of INTRAVAL, which started in 1990, was concluded at the end of 1993. The objective of Phase 2 was to increase the understanding how various geophysical, geohydrological and geochemical phenomena of importance for radionuclide transport from a repository to the biosphere could be described by mathematical models and to study the model validation process. Summarized results from Phase 2 of the INTRAVAL study are presented in this report. (K.A.)

  4. Dedicated OO expertise applied to Run II software projects

    International Nuclear Information System (INIS)

    Amidei, D.

    2000-01-01

    The change in software language and methodology by CDF and D0 to object-oriented from procedural Fortran is significant. Both experiments requested dedicated expertise that could be applied to software design, coding, advice and review. The Fermilab Run II offline computing outside review panel agreed strongly with the request and recommended that the Fermilab Computing Division hire dedicated OO expertise for the CDF/D0/Computing Division joint project effort. This was done and the two experts have been an invaluable addition to the CDF and D0 upgrade software projects and to the Computing Division in general. These experts have encouraged common approaches and increased the overall quality of the upgrade software. Advice on OO techniques and specific advice on C++ coding has been used. Recently a set of software reviews has been accomplished. This has been a very successful instance of a targeted application of computing expertise, and constitutes a very interesting study of how to move toward modern computing methodologies in HEP

  5. Investigation of the explosion hazards of hydrogen sulphide. (Phase II)

    International Nuclear Information System (INIS)

    Moen, I.O.

    1986-01-01

    The results of Phase II of an investigation directed towards quantifying the explosive hazards of hydrogen sulphide in air are described. This second and final phase is focussed on flame acceleration until detonation in obstacle environments simulating a heavy water plant. The results of previous experimental tests, both small and large scale, are compiled and summarized and the results of a series of flame acceleration tests are reported. These tests were performed in order to assess the potential for damaging explosions in simulated industrial environments with repeated obstacles. The experimented apparatus consisted of a channel 1.8 m x 1.8 m in cross-section and 15.5 m long. Two obstacle configurations were tested, corresponding to 500 mm or 220 mm diameter tubes mounted across the channel at regular intervals. Tests were performed with acetylene, propane and hydrogen sulphide fuels. The results of numerical simulation are also reported and compared with the observed results. Scaling predictions are also made. The key results are summarized in the main text, and detailed reports covering the various aspects are included in three annexes

  6. Investigation of the explosion hazards of hydrogen sulphide. Phase II

    International Nuclear Information System (INIS)

    Moen, I.O.

    1986-01-01

    The results of Phase II of an investigation directed towards quantifying the explosive hazards of hydrogen sulphide in air are described. This second and final phase is focussed on flame acceleration until detonation in obstacle environments simulating a heavy water plant. The results of previous experimental tests, both small and large scale, are compiled and summarized and the results of a series of flame acceleration tests are reported. These tests were performed in order to assess the potential for damaging explosions in simulated industrial environments with repeated obstacles. The experimented apparatus consisted of a channel 1.8 m x 1.8 m in cross-section and 15.5 m long. Two obstacle configurations were tested, corresponding to 500 mm or 220 mm diameter tubes mounted across the channel at regular intervals. Tests were performed with acetylene, propane and hydrogen sulphide fuels. The results of numerical simulation are also reported and compared with the observed results. Scaling predictions are also made. The key results are summarized in the main text, and detailed reports covering the various aspects are included in three annexes

  7. Development of a highway incident management operational and training guide : phase II.

    Science.gov (United States)

    2014-08-01

    The overall goal of both phases of this project was to reduce responder fatalities and injuries, as well as to prevent : secondary crashes, especially those involving incident responders. The phases of this project worked toward this goal : by creati...

  8. MHD seed recovery and regeneration, Phase II. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    This final report summarizes the work performed by the Space and Technology Division of the TRW Space and Electronics Group for the U.S. Department of Energy, Pittsburgh Energy Technology Center for the Econoseed process. This process involves the economical recovery and regeneration of potassium seed used in the MHD channel. The contract period of performance extended from 1987 through 1994 and was divided into two phases. The Phase II test results are the subject of this Final Report. However, the Phase I test results are presented in summary form in Section 2.3 of this Final Report. The Econoseed process involves the treatment of the potassium sulfate in spent MHD seed with an aqueous calcium formate solution in a continuously stirred reactor system to solubilize, as potassium formate, the potassium content of the seed and to precipitate and recover the sulfate as calcium sulfate. The slurry product from this reaction is centrifuged to separate the calcium sulfate and insoluble seed constituents from the potassium formate solution. The dilute solids-free potassium formate solution is then concentrated in an evaporator. The concentrated potassium formate product is a liquid which can be recycled as a spray into the MHD channel. Calcium formate is the seed regenerant used in the Econoseed process. Since calcium formate is produced in the United States in relatively small quantities, a new route to the continuous production of large quantities of calcium formate needed to support an MHD power industry was investigated. This route involves the reaction of carbon monoxide gas with lime solids in an aqueous medium.

  9. Interest groups, the Lesotho Highlands Water Project Phase 1

    African Journals Online (AJOL)

    interest groups can bring about changes in the water policy arena. ... Lesotho Highlands Water Project Phase 1 as a case study. ... attempts to influence public policy and their representation ... ties concern the relations between state actors and non-state ..... 'bears responsibility here [LHWP], since it is the sponsor of.

  10. Small car exposure data project. Phase 1 : methodology

    Science.gov (United States)

    1985-10-01

    The Small Car Exposure Data Project represents the first phase of an effort to build a data : base of exposure variables for crash-avoidance studies. Among these are: (1) vehicle make, : model, year, body style, wheel base, weight, and horsepower; (2...

  11. Phased Retrofits in Existing Homes in Florida Phase II. Shallow Plus Retrofits

    Energy Technology Data Exchange (ETDEWEB)

    Sutherland, K. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Parker, D. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Martin, E. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Chasar, D. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States); Amos, B. [Building America Partnership for Improved Residential Construction, Cocoa, FL (United States)

    2016-02-01

    The BAPIRC team and Florida Power and Light (FPL) electric utility pursued a pilot phased energy-efficiency retrofit program in Florida by creating detailed data on the energy and economic performance of two levels of retrofit - simple and deep. For this Phased Deep Retrofit (PDR) project, a total of 56 homes spread across the utility partner's territory in east central Florida, southeast Florida, and southwest Florida were instrumented between August 2012 and January 2013, and received simple pass-through retrofit measures during the period of March 2013 - June 2013. Ten of these homes received a deeper package of retrofits during August 2013 - December 2013.

  12. Multifunctional Metal/Polymer Composite Fiber for Space Applications, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — In this Small Business Innovation Research Phase II Program, Syscom Technology, Inc. will implement an integrated processing scheme to fabricate a conductive...

  13. Phase accuracy evaluation for phase-shifting fringe projection profilometry based on uniform-phase coded image

    Science.gov (United States)

    Zhang, Chunwei; Zhao, Hong; Zhu, Qian; Zhou, Changquan; Qiao, Jiacheng; Zhang, Lu

    2018-06-01

    Phase-shifting fringe projection profilometry (PSFPP) is a three-dimensional (3D) measurement technique widely adopted in industry measurement. It recovers the 3D profile of measured objects with the aid of the fringe phase. The phase accuracy is among the dominant factors that determine the 3D measurement accuracy. Evaluation of the phase accuracy helps refine adjustable measurement parameters, contributes to evaluating the 3D measurement accuracy, and facilitates improvement of the measurement accuracy. Although PSFPP has been deeply researched, an effective, easy-to-use phase accuracy evaluation method remains to be explored. In this paper, methods based on the uniform-phase coded image (UCI) are presented to accomplish phase accuracy evaluation for PSFPP. These methods work on the principle that the phase value of a UCI can be manually set to be any value, and once the phase value of a UCI pixel is the same as that of a pixel of a corresponding sinusoidal fringe pattern, their phase accuracy values are approximate. The proposed methods provide feasible approaches to evaluating the phase accuracy for PSFPP. Furthermore, they can be used to experimentally research the property of the random and gamma phase errors in PSFPP without the aid of a mathematical model to express random phase error or a large-step phase-shifting algorithm. In this paper, some novel and interesting phenomena are experimentally uncovered with the aid of the proposed methods.

  14. Project Half Double: Current Results of Phase 1 and Phase 2, December 2017

    DEFF Research Database (Denmark)

    Svejvig, Per; Thorp Adland, Karoline; Zippora Klein, Judith Birte

    ’s competitiveness and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “Projects in half the time with double the impact” where projects in half the time should be understood as half the time to impact (benefit realization, effect is achieved) and not as half the time...... of Project Half Double was initiated in June 2015. It is a two-phase project: phase 1 took place from June 2015 to June 2016 with seven pilot projects, and phase 2 is in progress from July 2016 to July 2018 with 10 pilot projects. The Half Double consortium: Implement Consulting Group is the project leader....... 2016, Svejvig et al. 2017). This report’s target group inludes practitioners in Danish industry and society in general. The editorial team from Aarhus University prepared the report from October 2017 to December 2017, which means that data about pilot projects from December 2017 is not included....

  15. Mercury Phase II Study - Mercury Behavior in Salt Processing Flowsheet

    International Nuclear Information System (INIS)

    Jain, V.; Shah, H.; Wilmarth, W. R.

    2016-01-01

    Mercury (Hg) in the Savannah River Site Liquid Waste System (LWS) originated from decades of canyon processing where it was used as a catalyst for dissolving the aluminum cladding of reactor fuel. Approximately 60 metric tons of mercury is currently present throughout the LWS. Mercury has long been a consideration in the LWS, from both hazard and processing perspectives. In February 2015, a Mercury Program Team was established at the request of the Department of Energy to develop a comprehensive action plan for long-term management and removal of mercury. Evaluation was focused in two Phases. Phase I activities assessed the Liquid Waste inventory and chemical processing behavior using a system-by-system review methodology, and determined the speciation of the different mercury forms (Hg+, Hg++, elemental Hg, organomercury, and soluble versus insoluble mercury) within the LWS. Phase II activities are building on the Phase I activities, and results of the LWS flowsheet evaluations will be summarized in three reports: Mercury Behavior in the Salt Processing Flowsheet (i.e. this report); Mercury Behavior in the Defense Waste Processing Facility (DWPF) Flowsheet; and Mercury behavior in the Tank Farm Flowsheet (Evaporator Operations). The evaluation of the mercury behavior in the salt processing flowsheet indicates, inter alia, the following: (1) In the assembled Salt Batches 7, 8 and 9 in Tank 21, the total mercury is mostly soluble with methylmercury (MHg) contributing over 50% of the total mercury. Based on the analyses of samples from 2H Evaporator feed and drop tanks (Tanks 38/43), the source of MHg in Salt Batches 7, 8 and 9 can be attributed to the 2H evaporator concentrate used in assembling the salt batches. The 2H Evaporator is used to evaporate DWPF recycle water. (2) Comparison of data between Tank 21/49, Salt Solution Feed Tank (SSFT), Decontaminated Salt Solution Hold Tank (DSSHT), and Tank 50 samples suggests that the total mercury as well as speciated

  16. High precision capacitive beam phase probe for KHIMA project

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Ji-Gwang, E-mail: windy206@hanmail.net [Korea Institute of Radiological and Medical Sciences, 215–4, Gongneung-dong, Nowon-t, Seoul 139–706 (Korea, Republic of); Yang, Tae-Keun [Korea Institute of Radiological and Medical Sciences, 215–4, Gongneung-dong, Nowon-t, Seoul 139–706 (Korea, Republic of); Forck, Peter [GSI Helmholtz Centre for Ion Research, Darmstadt 64291, German (Germany)

    2016-11-21

    In the medium energy beam transport (MEBT) line of KHIMA project, a high precision beam phase probe monitor is required for a precise tuning of RF phase and amplitude of Radio Frequency Quadrupole (RFQ) accelerator and IH-DTL linac. It is also used for measuring a kinetic energy of ion beam by time-of-flight (TOF) method using two phase probes. The capacitive beam phase probe has been developed. The electromagnetic design of the high precision phase probe was performed to satisfy the phase resolution of 1° (@200 MHz). It was confirmed by the test result using a wire test bench. The measured phase accuracy of the fabricated phase probe is 1.19 ps. The pre-amplifier electronics with the 0.125 ∼ 1.61 GHz broad-band was designed and fabricated for amplifying the signal strength. The results of RF frequency and beam energy measurement using a proton beam from the cyclotron in KIRAMS is presented.

  17. An Overview of Materials Structures for Extreme Environments Efforts for 2015 SBIR Phases I and II

    Science.gov (United States)

    Nguyen, Hung D.; Steele, Gynelle C.

    2017-01-01

    Technological innovation is the overall focus of NASA's Small Business Innovation Research (SBIR) program. The program invests in the development of innovative concepts and technologies to help NASA's mission directorates address critical research and development needs for Agency projects. This report highlights innovative SBIR 2015 Phase I and II projects that specifically address areas in Materials and Structures for Extreme Environments, one of six core competencies at NASA Glenn Research Center. Each article describes an innovation, defines its technical objective, and highlights NASA applications as well as commercial and industrial applications. Ten technologies are featured: metamaterials-inspired aerospace structures, metallic joining to advanced ceramic composites, multifunctional polyolefin matrix composite structures, integrated reacting fluid dynamics and predictive materials degradation models for propulsion system conditions, lightweight inflatable structural airlock (LISA), copolymer materials for fused deposition modeling 3-D printing of nonstandard plastics, Type II strained layer superlattice materials development for space-based focal plane array applications, hydrogenous polymer-regolith composites for radiation-shielding materials, a ceramic matrix composite environmental barrier coating durability model, and advanced composite truss printing for large solar array structures. This report serves as an opportunity for NASA engineers, researchers, program managers, and other personnel to learn about innovations in this technology area as well as possibilities for collaboration with innovative small businesses that could benefit NASA programs and projects.

  18. Space Qualified Non-Destructive Evaluation and Structural Health Monitoring Technology, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Encouraged by Phase I accomplishments, the proposed Phase II program will significantly mature and align the development of a Space Qualified Non-Destructive...

  19. Lightweight Thermally Stable Multi-Meter Aperture Submillimeter Reflectors, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of the Phase II effort will be an affordable demonstrated full-scale design for a thermally stable multi-meter submillimeter reflector. The Phase I...

  20. Reconfigurable L-band Radar Transceiver using Digital Signal Synthesis, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — This Phase II proposal, builds upon the extensive research and digital radar design that has been successfully completed during the Phase I contract. Key innovations...

  1. MULTIFUNCTIONAL, SELF-HEALING HYBRIDSIL MATERIALS FOR EVA SPACE SUIT PRESSURE GARMENT SYSTEMS, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — A Phase II SBIR transition of NanoSonic's high flex HybridSil space suit bladder and glove materials will provide a pivotal funding bridge toward Phase III...

  2. X-ray diffraction study of phase transitions in iron(II) trisnioximate hexadecylboronate clathrochelate complex

    International Nuclear Information System (INIS)

    Vorontsov, I.I.; Antipin, M.Yu.; Dubovik, I.I.; Papkov, V.S.; Potekhin, K.A.; Voloshin, Ya.Z.; Stash, A.I.; Belsky, V.K.

    2001-01-01

    Crystals of the iron(II) nioximate hexadecylboronate clathrochelate complex-FeNx 3 (BHd ) 2 [tris(μ-1,2-cyclohexanedionedioximato-O:O ' )di-n-hexadecyldiborato(2-) - N,'''N''',N''',N''',N''',N ' ]iron(II) - are investigated by differential scanning calorimetry and X-ray diffraction. Two structural phase transitions are revealed at T cr1 = 290(3) K and T cr2 = 190(3) K. The crystal structures of phases I, II, and III are determined by X-ray diffraction analysis at 303, 243, and 153 K, respectively. It is demonstrated that the I ↔ II phase transition is due to a change in the system of translations, and the II ↔ III phase transition is accompanied only by a jumpwise change in the unit cell parameters. The possible mechanisms of phase transitions are discussed in terms of geometry and molecular packing of FeNx 3 (BHd) 2 in all three phases

  3. Aging of snubbers in nuclear service: Phase I study results and Phase II plans

    International Nuclear Information System (INIS)

    Goodman, R.L.; Bush, S.H.; Page, R.E.

    1988-01-01

    Two major research areas were investigated in the Phase I snubber aging studies. The first area involved a preliminary evaluation of the effects of various aging mechanisms on snubber operation; failure modes of mechanisms were identified and their contributions to aging degradation were assessed relative to other failure modes. The second area involved estimating the efficacy of existing tests and examinations that are intended to determine the effects of aging and degradation. Available data on snubber behavior and operating experience were reviewed, using licensee event reports and other historical data for the 10-year period from 1973 through 1983. Value-impact was considered in terms of (1) exposure of workers to radioactive environments for examination/testing and (2) the cost for expansion of the snubber testing program due to failed snubbers. Results from the Phase I studies identified the need to modify or improve examination and testing procedures to enhance snubber reliability. Based on the results of the Phase I snubber studies, the seals and fluids were identified as the two principal elements affected by aging degradation in hydraulic snubbers. Phase II work, which was initiated in FY 1987, will develop cooperative activities between PNL and operating utilities through the Snubber Utility Group (SNUG), who will work to establish a strong data and experience base for both hydraulic and mechanical snubbers based on actual operating and maintenance history at nuclear power plants. Application guidelines for snubbers will be recommended based on the study results

  4. Background rejection of n+ surface events in GERDA Phase II

    Science.gov (United States)

    Lehnert, Björn

    2016-05-01

    The GERDA experiment searches for neutrinoless double beta (0vββ) decay in 76Ge using an array of high purity germanium (HPGe) detectors immersed in liquid argon (LAr). Phase II of the experiment uses 30 new broad energy germanium (BEGe) detectors with superior pulse shape discrimination capabilities compared to the previously used semi-coaxial detector design. By far the largest background component for BEGe detectors in GERDA are n+-surface events from 42K β decays which are intrinsic in LAr. The β particles with up to 3.5 MeV can traverse the 0.5 to 0.9 mm thick electrode and deposit energy within the region of interest for the 0vββ decay. However, those events have particular pulse shape features allowing for a strong discrimination. The understanding and simulation of this background, showing a reduction by up to a factor 145 with pulse shape discrimination alone, is presented in this work.

  5. The Phase II ATLAS Pixel Upgrade: The Inner Tracker (ITk)

    CERN Document Server

    Flick, Tobias; The ATLAS collaboration

    2016-01-01

    The entire tracking system of the ATLAS experiment will be replaced during the LHC Phase II shutdown (foreseen to take place around 2025) by an all-silicon detector called the ITk (Inner Tracker). The pixel detector will comprise the five innermost layers, and will be instrumented with new sensor and readout electronics technologies to improve the tracking performance and cope with the HL-LHC environment, which will be severe in terms of occupancy and radiation. The total surface area of silicon in the new pixel system could measure up to 14 m^2, depending on the final layout choice, which is expected to take place in early 2017. Four layout options are being investigated at the moment, two with forward coverage to eta < 3.2 and two to eta < 4. For each coverage option, a layout with long barrel staves and a layout with novel inclined support structures in the barrel-endcap overlap region are considered. All potential layouts include modules mounted on ring-shaped supports in the endcap regions. Support...

  6. Micromegas R&D for ATLAS MUON PHASE II Upgrade

    CERN Document Server

    Farina, Edoardo Maria; The ATLAS collaboration

    2017-01-01

    In the framework of the ATLAS Phase II Upgrade, a proposal to extend the detector acceptance of the muon system to high η has been put forward (namely up to | η| ~ 4). Extension of the muon coverage has been demonstrated to enhance physics performance. The proposed location for the new detector is in between the end-cap calorimeter cryostat and the JD shielding; in this region there is no magnetic field applied, the aim of the new detector is therefore to only tag muons without performing any momentum measurement. The new η tagger should cope with extremely high particle rate, that has been calculated, by means of simulations, to be 9 MHz at R = 25 cm and 0.4 MHz at R = 60 cm for μ = 200, where μ stands for the number of pp collisions per bunch crossing. The required spatial resolution at the inner edge of the detector has been estimated in few hundreds micrometres. One of the most promising candidate technology for the new detector is the MicroMegaS one, which has already been adopted for the NSW upgrad...

  7. Thymostimulin in advanced hepatocellular carcinoma: A phase II trial

    Directory of Open Access Journals (Sweden)

    Behl Susanne

    2008-03-01

    Full Text Available Abstract Background Thymostimulin is a thymic peptide fraction with immune-mediated cytotoxicity against hepatocellular carcinoma in vitro. In a phase II trial, we investigated safety and efficacy including selection criteria for best response in advanced or metastasised hepatocellular carcinoma. Methods 44 patients (84 % male, median age 69 years not suitable or refractory to conventional therapy received thymostimulin 75 mg subcutaneously five times per week for a median of 8.2 months until progression or complete response. 3/44 patients were secondarily accessible to local ablation or chemoembolisation. Primary endpoint was overall survival, secondary endpoint tumor response or progression-free survival. A multivariate Cox's regression model was used to identify variables affecting survival. Results Median survival was 11.5 months (95% CI 7.9–15.0 with a 1-, 2- and 3-year survival of 50%, 23% and 9%. In the univariate analysis, a low Child-Pugh-score (p = 0.01, a low score in the Okuda- and CLIP-classification (p Conclusion Outcome in our study rather depended on liver function and intrahepatic tumor growth (presence of liver cirrhosis and Okuda stage in addition to response to thymostimulin, while an invasive HCC phenotype had no influence in the multivariate analysis. Thymostimulin could therefore be considered a safe and promising candidate for palliative treatment in a selected target population with advanced hepatocellular carcinoma, in particular as component of a multimodal therapy concept. Trial registration Current Controlled Trials ISRCTN29319366.

  8. Validation of KENOREST with LWR-PROTEUS phase II samples

    Energy Technology Data Exchange (ETDEWEB)

    Wagner, M.; Kilger, R.; Pautz, A.; Zwermann, W. [GRS, Garching (Germany); Grimm, P.; Vasiliev, A.; Ferroukhi, H. [Paul Scherrer Institut, Villigen (Switzerland)

    2012-11-01

    In order to broaden the validation basis of the reactivity and nuclide inventory code KENOREST two samples of the LWR-PROTEUS phase II program have been calculated and compared to the experimental results. In general most nuclides are reproduced very well and agree within about ten percent with the experiment. Some already known problems, the overprediction of metallic fission products and the underprediction of the higher curium isotopes, have been confirmed. One of the largest uncertainties in the calculation was the burnup of the samples due to differences between a core simulation of the fuel vendor and the burnup determined from the measured values of the burnup indicator Nd-148. Two different models taking into account the environment for a peripheral fuel rod have been studied. The more detailed model included the three direct neighbor fuel assemblies depleted along with the fuel rod of interest. The influence on the results has been found to be very small. Compared to the uncertainties from the burnup, this effect can be considered negligible. The reason for the low influence was basically that the spectrum did not get considerably harder with increasing burnup beyond about 20GWd/tHM. Since the sample reached burnups far beyond that value, an effect could not be seen. In the near future an update of the used libraries is planned and it will be very interesting to study the effect on the results, especially for Curium. (orig.)

  9. Characterization of ToxCast Phase II compounds disruption of ...

    Science.gov (United States)

    The development of multi-well microelectrode array (mwMEA) systems has increased in vitro screening throughput making them an effective method to screen and prioritize large sets of compounds for potential neurotoxicity. In the present experiments, a multiplexed approach was used to determine compound effects on both neural function and cell health in primary cortical networks grown on mwMEA plates following exposure to ~1100 compounds from EPA’s Phase II ToxCast libraries. On DIV 13, baseline activity (40 min) was recorded prior to exposure to each compound at 40 µM. DMSO and the GABAA antagonist bicuculline (BIC) were included as controls on each mwMEA plate. Changes in spontaneous network activity (mean firing rate; MFR) and cell viability (lactate dehydrogenase; LDH and CellTiter Blue; CTB) were assessed within the same well following compound exposure. Activity calls (“hits”) were established using the 90th and 20th percentiles of the compound-induced change in MFR (medians of triplicates) across all tested compounds; compounds above (top 10% of compounds increasing MFR), and below (bottom 20% of compounds decreasing MFR) these thresholds, respectively were considered hits. MFR was altered beyond one of these thresholds by 322 compounds. Four compound categories accounted for 66% of the hits, including: insecticides (e.g. abamectin, lindane, prallethrin), pharmaceuticals (e.g. haloperidol, reserpine), fungicides (e.g. hexaconazole, fenamidone), and h

  10. Postirradiation examination of BEATRIX-II, Phase 1

    International Nuclear Information System (INIS)

    Slagle, O.D.; Hobbs, F.D.; Baldwin, D.L.; Hollenberg, G.W.; Takahashi, T.; Noda, K.; Verrall, R.A.

    1993-09-01

    BEATRIX-II is an in situ tritium recovery experiment that was designed to characterize the behavior of lithium ceramics irradiated to high burnup in a fast neutron flux. Postirradiation examination was carried out on the Phase 1 vented canisters: one containing a Li 2 O ring capable of temperature changes and the other a Li 2 O solid specimen with a center temperature of 1,000 degrees C. The tritium inventory of the ring specimen at 650 degrees C was determined to be in the range from 0.2--0.6 wppm while for the solid specimen the inventory varied from 1.4 wppm at the surface to 0.06 wppm at the inner surface. Downstream transport of the Li 2 O by the sweep gas was determined to be insignificant from analyses of acid rinses of selected canister surfaces. Densification and restructuring of the solid specimen during irradiation resulted in the development of a central annulus. Ceramography was used to characterize the columnar grain structure and the mechanisms involved in its evolution

  11. Project U17 : Trusted Truck II (phase C).

    Science.gov (United States)

    2009-07-01

    The states conduct close to 750,000 roadside inspections of commercial vehicles per year. Even with this seemingly large number of inspections, the states are still being overwhelmed with the burden of performing inspections in a fashion that ensures...

  12. Development of methods for measuring materials nuclear characteristics, Phases, I, II, II and IV; Razvijanje metoda merenja nuklearnih karakteristika materijala, I, II, II i VI faza

    Energy Technology Data Exchange (ETDEWEB)

    Maglic, R [Boris Kidric Institute of Nuclear Sciences Vinca, Belgrade (Yugoslavia)

    1963-04-15

    This report contains the following phases of the project 'measurement of nuclear characteristics of reactor materials': nuclear performances of the neutron chopper; method for measuring total effective cross sections by transmission method on the chopper; review of methods for measuring activation cross sections; measurement of neutron spectra of the RA reactor and measurement of total effective cross section of gold by using the chopper.

  13. The third phase of the OECD/NEA TDB project: TDB III

    International Nuclear Information System (INIS)

    Mompean, F.J.; Illemassene, M.; Perrone, J.

    2005-01-01

    In 2003 with a foreseen duration of four years. The main objective of this new phase is to extend the existing critically reviewed database for elements of relevance in radioactive waste management, paying attention to the needs of the various national programmes. Following the decision by the Project Management Board (integrated by representatives of 16 organisations with responsibilities in radioactive waste management in 12 OECD member countries) the elements contemplated in this new phase are Th, Sn and Fe, with a higher priority being allocated to inorganic species and compounds. In addition to the corresponding review teams for these elements, an additional expert team has been constituted to prepare guidelines for the evaluation of thermodynamic data for solid solutions. As was the case in TDB Phase II, the basic project review methodology remains unaltered in TDB III. The Figure illustrates the relationship between the various TDB bodies, with an International Organisation, the OECD NEA, acting as Project Coordinator and linking the independent scientific teams and the project governing bodies. This organizational paradigm has proven successful with the recent completion of the five Phase II Reviews (Update, Ni, Se, Zr and Organic Ligands). The review and expert team activities were started in 2004 (except for Fe, being started in 2005) following an initiation stage. This preliminary stage was designed in order to tailor the team compositions to the existing literature for each element. The first reviews stemming from TDB III are scheduled to appear in published form in 2007. The successful completion of these objectives will add three further reports to the current series of nine volumes (dealing with the chemical thermodynamics of U, Np, Pu, Am, Tc, Ni, Se, Zr and compounds and complexes of these elements with oxalate, citrate, EDTA and isa). (authors)

  14. Environmentally benign manufacturing of compact disc stampers[Final Phase II report]; FINAL

    International Nuclear Information System (INIS)

    None

    1999-01-01

    Optical data storage is currently a$10B/yr. business. With the introduction of the high capacity Digital Versatile Disc (D/D) as well as the continued growth of CD-Audio and CD-ROM worldwide sales of optical data products as a whole are growing at rate of more than 10% per year. In North America, more than 2.5 billion optical discs will be sold in 1998. By 1999, the numbers of optical discs produced for the North American market will grow to almost three billion. The optical disc manufacturing industry is dominated by Asian and European companies (e.g. Sony of Japan and Philips of Netherlands). Prism Corporation has created a process that could significantly improve US competitiveness in the business of optical disc production. The objectives of the Phase II STTR project were to build and test an ion machining system (IMS) for stamper fabrication, prove overall manufacturing system feasibility by fabrication stampers and replicas, and evaluate alternative materials and alternative process parameters to optimize the process. During tie period of the Phase II project Prism Corporation was able to meet these objectives. In the course of doing so, adjustments had been made to better the project and in turn the final product. An ion machining system was designed and built that produced stampers ready for the molding process. Also, many control steps in the manufacturing process were studied to improve the current process and make it even more compatible with the industry standards, fitting seamlessly into current manufacturing lines

  15. Isotope aided studies of atmospheric carbon dioxide and other greenhouse gases. Phase II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-01-01

    The substantial increase in atmospheric greenhouse gas concentrations and their role in global warming have become major concerns of world governments. Application of isotope techniques to label sources and sinks of CO{sub 2} and other greenhouse gases has emerged as a potentially powerful method for reducing uncertainties in the global CO{sub 2} budgets and for tracing pathways and interaction of terrestrial, oceanic, and atmospheric pools of carbon. As with CO{sub 2} concentration measurements, meaningful integration of isotopes in global models requires careful attention to quality assurance, quality control and inter-comparability of measurements made by a number of networks and laboratories. To support improvements in isotope measurement capabilities, the IAEA began implementing Co-ordinated Research Projects (CRPs) in 1992. The first project, entitled Isotope Variations of Carbon Dioxide and other Trace Gases in the Atmosphere, was implemented from 1992 to 1994. A significant contribution was made towards a better understanding of the global carbon cycle and especially of the sources and sinks of carbon with data on the {sup 14}C and {sup 13}C content of atmospheric CO{sub 2}, pointing to a better understanding of the problem of the 'missing sink' in the global carbon cycle. Important methodological developments in the field of high precision stable isotope mass spectrometry and improved data acquisition procedures emerged from work carried out within the framework of this programme. The development of pressurized gas standards and planning for an associated interlaboratory calibration were initiated. Due to the good progress and long standing nature of the required work a second CRP was initiated and implemented from 1996 to 1999. It was entitled Isotope aided Studies of Atmospheric Carbon Dioxide and Other Trace Gases - Phase II, to document the close relationship of both programmes. This publication provides an overview of the scientific outcomes of the

  16. Isotope aided studies of atmospheric carbon dioxide and other greenhouse gases. Phase II

    International Nuclear Information System (INIS)

    2002-01-01

    The substantial increase in atmospheric greenhouse gas concentrations and their role in global warming have become major concerns of world governments. Application of isotope techniques to label sources and sinks of CO 2 and other greenhouse gases has emerged as a potentially powerful method for reducing uncertainties in the global CO 2 budgets and for tracing pathways and interaction of terrestrial, oceanic, and atmospheric pools of carbon. As with CO 2 concentration measurements, meaningful integration of isotopes in global models requires careful attention to quality assurance, quality control and inter-comparability of measurements made by a number of networks and laboratories. To support improvements in isotope measurement capabilities, the IAEA began implementing Co-ordinated Research Projects (CRPs) in 1992. The first project, entitled Isotope Variations of Carbon Dioxide and other Trace Gases in the Atmosphere, was implemented from 1992 to 1994. A significant contribution was made towards a better understanding of the global carbon cycle and especially of the sources and sinks of carbon with data on the 14 C and 13 C content of atmospheric CO 2 , pointing to a better understanding of the problem of the 'missing sink' in the global carbon cycle. Important methodological developments in the field of high precision stable isotope mass spectrometry and improved data acquisition procedures emerged from work carried out within the framework of this programme. The development of pressurized gas standards and planning for an associated interlaboratory calibration were initiated. Due to the good progress and long standing nature of the required work a second CRP was initiated and implemented from 1996 to 1999. It was entitled Isotope aided Studies of Atmospheric Carbon Dioxide and Other Trace Gases - Phase II, to document the close relationship of both programmes. This publication provides an overview of the scientific outcomes of the studies conducted within Phase

  17. A steerable/distance enhanced penetrometer delivery system: Phase II. Topical report

    International Nuclear Information System (INIS)

    Amini, A.; Shenhar, J.; Lum, K.D.

    1996-05-01

    This report summarizes the phase II work on the Position Location Device (POLO) for penetrometers. Phase II was carried out to generate an integrated design of a full-scale steerable/distance enhanced penetrometer delivery system. Steering provides for the controlled and directional use of the penetrometer, while vibratory thrusting can provide greater penetration ability

  18. TNX GeoSiphon Cell (TGSC-1) Phase II Single Cell Deployment/Demonstration Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Phifer, M.A.

    1999-04-15

    This Phase II final report documents the Phase II testing conducted from June 18, 1998 through November 13, 1998, and it focuses on the application of the siphon technology as a sub-component of the overall GeoSiphon Cell technology. [Q-TPL-T-00004

  19. OECD/NEA Aagesta decontamination project. Phase 1, final report

    International Nuclear Information System (INIS)

    1982-12-01

    The objective of the project is to utilize the four primary loops of the Aagesta reactor to demonstrate decontamination methods for PWR primary systems. The first phase of the project consisted of laboratory scale tests. The methods tested were developed at a) Studsvik Energiteknik AB, Sweden (a soft chemistry). b) Kraftwerk Union AG, Federal Republic of Germany, (two chemistries, one soft and one hard). c) Swiss Federal Institute of Reactor Research (two chemistries, one soft and one hard). d) Berkeley Nuclear Laboratories, United Kingdom, (a soft chemistry). The test programme consisted of decontamination tests on steam generator tubing and other active material from Aagesta and a number of operating reactors as well as material compatibility tests on standardized samples of a representative selection of modern PWR primary system materials. Six countries have participated in Phase I of the project - the four countries named above as well as the United States of America and Italy. Studsvik Energiteknik AB was appointed Project leader. The results show that all six processes in general met the acceptance criteria both regarding decontamination and corrosion. The decontamination results with the hard chemistries were rather uneven. (Author)

  20. Development of advanced blanket performance under irradiation and system integration through JUPITER-II project

    Energy Technology Data Exchange (ETDEWEB)

    Abe, Katsunori; Kohyama, Akira; Tanaka, Satoru; Namba, C.; Terai, T.; Kunugi, T.; Muroga, Takeo; Hasegawa, Akira; Sagara, A.; Berk, S.; Zinkle, Steven J.; Sze, Dai Kai; Petti, D. A.; Abdou, Mohamed A.; Morley, Neil B.; Kurtz, Richard J.; Snead, Lance L.; Ghoniem, Nasr M.

    2008-12-01

    This report describes an outline of the activities of the JUPITER-II collaboration (japan-USA program of Irradiation/Integration test for Fusion Research-II), Which has bee carried out through six years (2001-2006) under Phase 4 of the collabroation implemented by Amendment 4 of Annex 1 to the DOE (United States Department of Energy)-MEXT (Ministry of Education ,Culture,Sports,Science and Technology) Cooperation. This program followed the RTNS-II Program (Phase1:1982-4986), the FFTF/MOTA Program (Phase2:1987-1994) and the JUPITER Program (Phase 3: 1995-2000) [1].

  1. CSNI Project for Fracture Analyses of Large-Scale International Reference Experiments (FALSIRE II)

    Energy Technology Data Exchange (ETDEWEB)

    Bass, B.R.; Pugh, C.E.; Keeney, J. [Oak Ridge National Lab., TN (United States); Schulz, H.; Sievers, J. [Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH, Koeln (Gemany)

    1996-11-01

    A summary of Phase II of the Project for FALSIRE is presented. FALSIRE was created by the Fracture Assessment Group (FAG) of the OECD/NEA`s Committee on the Safety of Nuclear Installations (CNSI) Principal Working Group No. 3. FALSIRE I in 1988 assessed fracture methods through interpretive analyses of 6 large-scale fracture experiments in reactor pressure vessel (RPV) steels under pressurized- thermal-shock (PTS) loading. In FALSIRE II, experiments examined cleavage fracture in RPV steels for a wide range of materials, crack geometries, and constraint and loading conditions. The cracks were relatively shallow, in the transition temperature region. Included were cracks showing either unstable extension or two stages of extensions under transient thermal and mechanical loads. Crack initiation was also investigated in connection with clad surfaces and with biaxial load. Within FALSIRE II, comparative assessments were performed for 7 reference fracture experiments based on 45 analyses received from 22 organizations representing 12 countries. Temperature distributions in thermal shock loaded samples were approximated with high accuracy and small scatter bands. Structural response was predicted reasonably well; discrepancies could usually be traced to the assumed material models and approximated material properties. Almost all participants elected to use the finite element method.

  2. CSNI Project for Fracture Analyses of Large-Scale International Reference Experiments (FALSIRE II)

    International Nuclear Information System (INIS)

    Bass, B.R.; Pugh, C.E.; Keeney, J.; Schulz, H.; Sievers, J.

    1996-11-01

    A summary of Phase II of the Project for FALSIRE is presented. FALSIRE was created by the Fracture Assessment Group (FAG) of the OECD/NEA's Committee on the Safety of Nuclear Installations (CNSI) Principal Working Group No. 3. FALSIRE I in 1988 assessed fracture methods through interpretive analyses of 6 large-scale fracture experiments in reactor pressure vessel (RPV) steels under pressurized- thermal-shock (PTS) loading. In FALSIRE II, experiments examined cleavage fracture in RPV steels for a wide range of materials, crack geometries, and constraint and loading conditions. The cracks were relatively shallow, in the transition temperature region. Included were cracks showing either unstable extension or two stages of extensions under transient thermal and mechanical loads. Crack initiation was also investigated in connection with clad surfaces and with biaxial load. Within FALSIRE II, comparative assessments were performed for 7 reference fracture experiments based on 45 analyses received from 22 organizations representing 12 countries. Temperature distributions in thermal shock loaded samples were approximated with high accuracy and small scatter bands. Structural response was predicted reasonably well; discrepancies could usually be traced to the assumed material models and approximated material properties. Almost all participants elected to use the finite element method

  3. ATLAS calorimeters: Run-2 performances and Phase-II upgrades

    CERN Document Server

    Boumediene, Djamel Eddine; The ATLAS collaboration

    2017-01-01

    The ATLAS detector was designed and built to study proton-proton collisions produced at the LHC at centre-of-mass energies up to 14 TeV and instantaneous luminosities up to $10^{34} cm^{-2} s^{-1}$. A Liquid Argon-lead sampling (LAr) calorimeter is employed as electromagnetic and hadronic calorimeters, except in the barrel region, where a scintillator-steel sampling calorimeter (TileCal) is used as hadronic calorimeter. This presentation gives first an overview of the detector operation and data quality, as well as of the achieved performances of the ATLAS calorimetry system. Additionally the upgrade projects of the ATLAS calorimeter system for the high luminosity phase of the LHC (HL-LHC) are presented. For the HL-LHC, the instantaneous luminosity is expected to increase up to $L \\simeq 7.5 × 10^{34} cm^{-2} s^{-1}$ and the average pile-up up to 200 interactions per bunch crossing. The major R&D item is the upgrade of the electronics for both LAr and Tile calorimeters in order to cope with longer latenc...

  4. The Phase II Upgrade of the ATLAS Calorimeter

    CERN Document Server

    Tartarelli, Giuseppe Francesco; The ATLAS collaboration

    2017-01-01

    This presentation will show the status of the upgrade projects of the ATLAS calorimeter system for the high luminosity phase of the LHC (HL-LHC). For the HL-LHC, the instantaneous luminosity is expected to increase up to L ≃ 7.5 × 1034 cm−2 s−1 and the average pile-up up to 200 interactions per bunch crossing. The Liquid Argon (LAr) calorimeter electronics will need to be replaced to cope with these challenging conditions: the expected radiation doses will indeed exceed the qualification range of the current readout system, and the upgraded trigger system will require much longer data storage in the electronics (up to 60 us), that the current system cannot sustain. The status of the R&D of the low-power ASICs (pre-amplifier, shaper, ADC, serializer and transmitters) and of the readout electronics design will be discussed. Moreover, a High Granularity Timing Detector (HGTD) is proposed to be added in front of the LAr calorimeters in the end-cap region (2.4 <|eta|< 4.2) for pile-up mitigation a...

  5. ATLAS Calorimeters: Run-2 performance and Phase-II upgrade

    CERN Document Server

    Boumediene, Djamel Eddine; The ATLAS collaboration

    2017-01-01

    The ATLAS detector was designed and built to study proton-proton collisions produced at the LHC at centre-of-mass energies up to 14 TeV and instantaneous luminosities up to 10^{34} cm^{−2} s^{−1}. A liquid argon (LAr)-lead sampling calorimeter is employed as electromagnetic calorimeter and hadronic calorimter, except in the barrel region, where a scintillator-steel sampling calorimeter (TileCal) is used as hadronic calorimter. This presentation will give first an overview of the detector operation and data quality, as well as the achieved performance of the ATLAS calorimetry system. Additionally, the upgrade projects of the ATLAS calorimeter system for the high luminosity phase of the LHC (HL-LHC) will be presented. For the HL-LHC, the instantaneous luminosity is expected to increase up to L ≃ 7.5 × 10^{34} cm^{−2} s^{−1} and the average pile-up up to 200 interactions per bunch crossing. The major R&D item is the upgrade of the electronics for both LAr and Tile calorimeters in order to cope wit...

  6. Solid phase selective separation and preconcentration of Cu(II) by Cu(II)-imprinted polymethacrylic microbeads.

    Science.gov (United States)

    Dakova, Ivanka; Karadjova, Irina; Ivanov, Ivo; Georgieva, Ventsislava; Evtimova, Bisera; Georgiev, George

    2007-02-12

    Ion-imprinted polymer (IIP) particles are prepared by copolymerization of methacrylic acid as monomer, trimethylolpropane trimethacrylate as crosslinking agent and 2,2'-azo-bis-isobutyronitrile as initiator in the presence of Cu(II), a Cu(II)-4-(2-pyridylazo)resorcinol (Cu(II)-PAR) complex, and PAR only. A batch procedure is used for the determination of the characteristics of the Cu(II) solid phase extraction from the IIP produced. The results obtained show that the Cu(II)-PAR IIP has the greatest adsorption capacity (37.4 micromol g(-1) of dry copolymer) among the IIPs investigated. The optimal pH value for the quantitative preconcentration is 7, and full desorption is achieved by 1 M HNO(3). The selectivity coefficients (S(Cu/Me)) for Me=Ni(II), Co(II) are 45.0 and 38.5, respectively. It is established that Cu(II)-PAR IIPs can be used repeatedly without a considerable adsorption capacity loss. The determination of Cu(II) ions in seawater shows that the interfering matrix does not influence the preconcentration and selectivity values of the Cu(II)-PAR IIPs. The detection and quantification limits are 0.001 micromol L(-1) (3sigma) and 0.003 micromol L(-1) (6sigma), respectively.

  7. Managing project complexity : A study into adapting early project phases to improve project performance in large engineering projects

    NARCIS (Netherlands)

    Bosch-Rekveldt, M.G.C.

    2011-01-01

    Engineering projects become increasingly more complex and project complexity is assumed to be one of the causes for projects being delivered late and over budget. However, what this project complexity actually comprised of was unclear. To improve the overall project performance, this study focuses

  8. Solid-phase extraction of Mn(II), Co(II), Ni(II), Cu(II), Cd(II) and Pb(II) ions from environmental samples by flame atomic absorption spectrometry (FAAS)

    Energy Technology Data Exchange (ETDEWEB)

    Duran, Celal [Department of Chemistry, Faculty of Art and Science, Karadeniz Technical University, 61080 Trabzon (Turkey); Gundogdu, Ali [Department of Chemistry, Faculty of Art and Science, Karadeniz Technical University, 61080 Trabzon (Turkey); Bulut, Volkan Numan [Department of Chemistry, Giresun Faculty of Art and Science, Karadeniz Technical University, 28049 Giresun (Turkey); Soylak, Mustafa [Department of Chemistry, Faculty of Art and Science, Erciyes University, 38039 Kayseri (Turkey)]. E-mail: soylak@erciyes.edu.tr; Elci, Latif [Department of Chemistry, Faculty of Art and Science, Pamukkale University, 20020 Denizli (Turkey); Sentuerk, Hasan Basri [Department of Chemistry, Faculty of Art and Science, Karadeniz Technical University, 61080 Trabzon (Turkey); Tuefekci, Mehmet [Department of Chemistry, Faculty of Art and Science, Karadeniz Technical University, 61080 Trabzon (Turkey)

    2007-07-19

    A new method using a column packed with Amberlite XAD-2010 resin as a solid-phase extractant has been developed for the multi-element preconcentration of Mn(II), Co(II), Ni(II), Cu(II), Cd(II), and Pb(II) ions based on their complex formation with the sodium diethyldithiocarbamate (Na-DDTC) prior to flame atomic absorption spectrometric (FAAS) determinations. Metal complexes sorbed on the resin were eluted by 1 mol L{sup -1} HNO{sub 3} in acetone. Effects of the analytical conditions over the preconcentration yields of the metal ions, such as pH, quantity of Na-DDTC, eluent type, sample volume and flow rate, foreign ions etc. have been investigated. The limits of detection (LOD) of the analytes were found in the range 0.08-0.26 {mu}g L{sup -1}. The method was validated by analyzing three certified reference materials. The method has been applied for the determination of trace elements in some environmental samples.

  9. Assessing the influence of project management on quality during the early phases of construction projects

    Directory of Open Access Journals (Sweden)

    Ljevo Žanesa

    2018-12-01

    Full Text Available Although the quality of a process affects the quality of the end product, there is currently an insignif­icant amount of knowledge about the quality of project management (PM processes that directly affect the quality of the delivered product (constructed building. This study presents a proposal for modeling the impact of the quality of the PM process on the quality of the con­structed building. The quality of the PM process is rep­resented by the main quality factors and product quality indicators. It presents the results of the interviews that were conducted and study cases that were analyzed in Bosnia and Herzegovina with a variety of project partici­pants (with different managerial perspectives in terms of the indicators of quality of the delivered product. All par­ticipants, regardless of managerial perspective, believe that the most important indicator of the quality of prod­ucts for each phase of the project is “customer satisfaction in the end phase”, the measurement of which is different for each project phase that is presented. The results of the factor analysis of the definition and the planning phases show that 11 variables, namely, the quality factors of the PM process, can be grouped into three new factors, which is described as 66.61% (77.046% of the basic set of vari­ables.

  10. An Overview of Power, Energy Storage, and Conversion Efforts for 2014 SBIR Phases I and II

    Science.gov (United States)

    Nguyen, Hung D.; Steele, Gynelle C.

    2016-01-01

    Technological innovation is the overall focus of NASA's Small Business Innovation Research (SBIR) program. The program invests in the development of innovative concepts and technologies to help NASA's mission directorates address critical research and development needs for agency projects. NASA's Small Business Innovation Research (SBIR) program focuses on technological innovation by investing in development of innovative concepts and technologies to help NASA mission directorates address critical research needs for Agency programs. This report highlights 15 of the innovative SBIR 2014 Phase I and II projects that focus on one of NASA Glenn Research Center's six core competencies-Power, Energy Storage and Conversion. The technologies cover a wide spectrum of applications such as high-radiation-tolerant ceramic voltage isolators, development of hermetic sealing glasses for solid oxide fuel cells, rechargeable lithium metal cells, high-efficiency direct methane solid oxide fuel cell systems, Li metal protection for high-energy space batteries, isolated bidirectional direct current converters for distributed battery energy applications, and high-efficiency rad-hard ultrathin Si photovoltaic cell technology for space. Each article describes an innovation and technical objective and highlights NASA commercial and industrial applications. This report provides an opportunity for NASA engineers, researchers, and program managers to learn how NASA SBIR technologies could help their programs and projects, and lead to collaborations and partnerships between the small SBIR companies and NASA that would benefit both.

  11. Environmental information volume: Liquid Phase Methanol (LPMEOH{trademark}) project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    The purpose of this project is to demonstrate the commercial viability of the Liquid Phase Methanol Process using coal-derived synthesis gas, a mixture of hydrogen and carbon monoxide. This report describes the proposed actions, alternative to the proposed action, the existing environment at the coal gasification plant at Kingsport, Tennessee, environmental impacts, regulatory requirements, offsite fuel testing, and DME addition to methanol production. Appendices include the air permit application, solid waste permits, water permit, existing air permits, agency correspondence, and Eastman and Air Products literature.

  12. Environmental information volume: Liquid Phase Methanol (LPMEOH trademark) project

    International Nuclear Information System (INIS)

    1996-05-01

    The purpose of this project is to demonstrate the commercial viability of the Liquid Phase Methanol Process using coal-derived synthesis gas, a mixture of hydrogen and carbon monoxide. This report describes the proposed actions, alternative to the proposed action, the existing environment at the coal gasification plant at Kingsport, Tennessee, environmental impacts, regulatory requirements, offsite fuel testing, and DME addition to methanol production. Appendices include the air permit application, solid waste permits, water permit, existing air permits, agency correspondence, and Eastman and Air Products literature

  13. Feasibility study on commercialized fast reactor cycle systems. Phase II final report

    International Nuclear Information System (INIS)

    Ieda, Yoshiaki; Uchikawa, Sadao; Okubo, Tsutomu; Ono, Kiyoshi; Kato, Atsushi; Kurisaka, Kenichi; Sakamoto, Yoshihiko; Sato, Kazujiro; Sato, Koji; Chikazawa, Yoshitaka; Nakai, Ryodai; Nakabayashi, Hiroki; Nakamura, Hirofumi; Namekawa, Takashi; Niwa, Hajime; Nomura, Kazunori; Hayashi, Hideyuki; Hayafune, Hiroki; Hirao, Kazunori; Mizuno, Tomoyasu; Muramatsu, Toshiharu; Ando, Masato; Ono, Katsumi; Ogata, Takanari; Kubo, Shigenobu; Kotake, Shoji; Sagayama, Yutaka; Takakuma, Katsuyuki; Tanaka, Toshihiko; Namba, Takashi; Fujii, Sumio; Muramatsu, Kazuyoshi

    2006-06-01

    A joint project team of Japan Atomic Energy Agency and the Japan Atomic Power Company (as the representative of the electric utilities) started the feasibility study on commercialized fast reactor cycle systems (F/S) in July 1999 in cooperation with Central Research Institute of Electric Power Industry and vendors. On the major premise of safety assurance, F/S aims to present an appropriate picture of commercialization of fast reactor (FR) cycle system which has economic competitiveness with light water reactor cycle systems and other electricity base load systems, and to establish FR cycle technologies for the future major energy supply. In the period from Japanese fiscal year (JFY) 1999 to 2000, the phase-I of F/S was carried out to screen our representative FR, reprocessing and fuel fabrication technologies. In the phase-II (JFY 2001-2005), the design study of FR cycle concepts, the development of significant technologies necessary for the feasibility evaluation, and the confirmation of key technical issues were performed to clarify the promising candidate concepts toward the commercialization. In this final phase-II report clarified the most promising concept, the R and D plan until around 2015, and the key issues for the commercialization. Based on the comprehensive evaluation in F/S, the combination of the sodium-cooled FR with MOX fuel core, the advanced-aqueous reprocessing process and the simplified-pelletizing fuel fabrication process was recommended as the mainline choice for the most promising concept. The concept exceeds in technical advancement, and the conformity to the development targets was higher compared with that of the others. Alternative technologies are prepared to be decrease the development risk of innovative technologies in the mainline choice. (author)

  14. ADVANCED SIMULATION CAPABILITY FOR ENVIRONMENTAL MANAGEMENT- CURRENT STATUS AND PHASE II DEMONSTRATION RESULTS

    Energy Technology Data Exchange (ETDEWEB)

    Seitz, R.

    2013-02-26

    The U.S. Department of Energy (USDOE) Office of Environmental Management (EM), Office of Soil and Groundwater, is supporting development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM is a state-of-the-art scientific tool and approach for understanding and predicting contaminant fate and transport in natural and engineered systems. The modular and open source high-performance computing tool facilitates integrated approaches to modeling and site characterization that enable robust and standardized assessments of performance and risk for EM cleanup and closure activities. The ASCEM project continues to make significant progress in development of computer software capabilities with an emphasis on integration of capabilities in FY12. Capability development is occurring for both the Platform and Integrated Toolsets and High-Performance Computing (HPC) Multiprocess Simulator. The Platform capabilities provide the user interface and tools for end-to-end model development, starting with definition of the conceptual model, management of data for model input, model calibration and uncertainty analysis, and processing of model output, including visualization. The HPC capabilities target increased functionality of process model representations, toolsets for interaction with Platform, and verification and model confidence testing. The Platform and HPC capabilities are being tested and evaluated for EM applications in a set of demonstrations as part of Site Applications Thrust Area activities. The Phase I demonstration focusing on individual capabilities of the initial toolsets was completed in 2010. The Phase II demonstration completed in 2012 focused on showcasing integrated ASCEM capabilities. For Phase II, the Hanford Site deep vadose zone (BC Cribs) served as an application site for an end-to-end demonstration of capabilities, with emphasis on integration and linkages between the Platform and HPC components. Other demonstrations

  15. High Transparent Metal Oxide / Polyimide Antistatic Coatings, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Through this Phase I program, Agiltron has successfully produced an innovative transparent conductive nanocomposite paint that holds the promise of meeting space...

  16. Fiber Optic Temperature Sensors for Thermal Protection Systems, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — In Phase 1, Intelligent Fiber Optic Systems Corporation (IFOS), in collaboration with North Carolina State University, successfully demonstrated a Fiber Bragg...

  17. Forum of stakeholder confidence - Phase II of program of work

    International Nuclear Information System (INIS)

    Le Bars, Yves

    2006-01-01

    The author welcomed the Forum for Stakeholder Confidence (FSC) participants and introduced the day's meetings that would investigate the possible contributions and conditions for RD and D to support stakeholder confidence. In his introductory remarks, Mr. Le Bars reviewed the intent of this topical discussion and its contribution to the Phase 2 Programme of Work for FSC. Observations were drawn from previous FSC work concerning the evolving requirements for stakeholder involvement that require a new culture within the organizations. It is recognized that each actor must respect certain values and abilities, and have the capacity to communicate, to learn from the public and to adapt. In particular, it was suggested that the role of the expert in the decision-making process has changed, and there is a need to restore credibility to the voice of experts to support the processes relating to radioactive waste management. Mr. Le Bars spoke about the changing role of the 'expert' and increasing demands from the public to be informed, active participants in decision-making processes. As societal expectations have evolved over the years, there is less willingness to give the expert the legitimacy to decide, or the expert working solely with the decision-maker. Rather, there are growing demands for public policies to be defined and implemented through decision-making processes that also invite stakeholder participation, as another important category of actors. Thus, the decision-making process can be viewed as now involving three parties: the public, the experts and decision-makers. Research must be positioned in this context. Research must be part of the process, structure, behaviour and debate. It is meant to be introduced in the process as contributor to the project definition, by providing scientific background. Further, it is best undertaken through an adaptive behaviour, carried out by institutions with a clearly defined and communicated role. In setting

  18. Results of the project 'combustion modelling' (BKM II); Ergebnisse des Projekts 'Brennkammermodellierung' (BKM II)

    Energy Technology Data Exchange (ETDEWEB)

    Noll, B.; Rachner, M.; Frank, P.; Schmitz, G.; Geigle, K.P.; Meier, W.; Schuetz, H.; Aigner, M. [DLR Deutsches Zentrum fuer Luft- und Raumfahrt e.V., Stuttgart (Germany). Inst. fuer Verbrennungstechnik; Kessler, R. [DLR Deutsches Zentrum fuer Luft- und Raumfahrt e.V., Goettingen (Germany). Inst. fuer Aerodynamik und Stroemungstechnik; Lehmann, B. [DLR Deutsches Zentrum fuer Luft- und Raumfahrt e.V., Koeln (Germany). Inst. fuer Antriebstechnik; Forkert, T. [DLR Deutsches Zentrum fuer Luft- und Raumfahrt e.V., Koeln (Germany). Simulation und Softwaretechnik

    2002-07-01

    In the year 1996 the spheres of competence of several DLR-Institutes working in the areas of fluid dynamics, reaction kinetics, combustion, numerical methods and laser measuring techniques have been brought together while contributing to the internal DLR project 'combustion chamber modelling (BKM)', in order to proceed with the computational simulation of combustion processes in combustion chambers of gas turbines. The main issue was the development of a research code for numerical simulation of fluid flow in real combustion chambers. Here the development of computational models of physical and chemical processes was emphasized, among other processes the formation of soot was treated. Moreover, a worldwide outstanding database of measured data for the purpose of code validation has been created within the framework of the BKM project using the laboratory facilities of the DLR, which are in Germany unique for the experimental investigation of the various processes in combustion chambers of gas turbines. The project BKM is part of the specific DLR-programme 'energy'. With the successful completion of the first phase of the project in 1998, a second project phase of three years (BKM II) has been launched at the beginning of 1999. Here the work of the first phase continued and new topics were tackled. The second phase of the project was partly founded by the DLR-programme 'aeronautics'. (orig.) [German] Im Jahr 1996 wurden die Faehigkeiten mehrerer DLR-Institute auf den Gebieten Stroemungsmechanik, Reaktionskinetik, Verbrennung sowie Numerische Verfahren und Laser-Messverfahren in dem DLR-internen Projekt 'Brennkammermodellierung' (BKM) zusammengefuehrt, um die rechnerische Simulation der Verbrennungsvorgaenge in Gasturbinen-Brennkammern voranzutreiben. Dabei war die Entwicklung eines Forschungscodes zur numerischen Simulation von realen Brennkammerstroemungen das vorrangige Ziel der Arbeiten. Ein besonderes Schwergewicht lag

  19. Refractory Coated/Lined Low Density Structures, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — This project addresses the development of refractory coated or lined low density structures applicable for advanced future propulsion system technologies. The...

  20. Hydrogeological characterization on surface-based investigation phase in the Mizunami underground research laboratory project, in Japan

    International Nuclear Information System (INIS)

    Saegusa, Hiromitsu; Onoe, Hironori; Takeuchi, Shinji; Takeuchi, Ryuji; Ohyama, Takuya

    2007-01-01

    The Mizunami Underground Research Laboratory (MIU) project is being carried out by Japan Atomic Energy Agency in the Cretaceous Toki granite in the Tono area, central Japan. The MIU project is a purpose-built generic underground research laboratory project that is planned for a broad scientific study of the deep geological environment as a basis of research and development for geological disposal of nuclear wastes. One of the main goals of the MIU project is to establish comprehensive techniques for investigation, analysis, and assessment of the deep geological environment. The MIU project has three overlapping phases: Surface-based Investigation (Phase I), Construction (Phase II) and Operation (Phase III). Hydrogeological investigations using a stepwise process in Phase I have been carried out in order to obtain information on important properties such as, location of water conducting features, hydraulic conductivity and so on. Hydrogeological modeling and groundwater flow simulations in Phase I have been carried out in order to synthesize these investigation results, to evaluate the uncertainty of the hydrogeological model and to identify the main issues for further investigations. Using the stepwise hydrogeological characterization approach and combining the investigation with modeling and simulation, understanding of the hydrogeological environment has been progressively improved. (authors)

  1. The Potential Economic Impact of Electricity Restructuring in the State of Oklahoma: Phase II Report; FINAL

    International Nuclear Information System (INIS)

    Hadley, SW

    2001-01-01

    In April 1997, the Oklahoma legislature passed a bill to restructure the state's electric industry, requiring that the generation sector be deregulated and allowing retail competition by July 2002. Details of the market structure were to be established later. Senate Bill No.220, introduced in the 2000 legislature, provided additional details on this market, but the bill did not pass. Subsequent discussions have identified the need for an objective analysis of the impact of restructuring on electricity prices and the state's economy, especially considering the experiences of other states following restructuring of their electric systems. Because of the recent experiences of other states undergoing restructuring (e.g., higher prices, greater volatility, lower reliability), concerns have been raised in states currently considering restructuring as to whether their systems are equally vulnerable. Factors such as local generation costs, transmission constraints, market concentration, and market design can all play a role in the success or failure of the market. Energy and ancillary services markets both play a role in having a well-functioning system. Customer responsiveness to market signals can enhance the flexibility of the market. The purpose of this project is to provide a model and process to evaluate the potential price and economic impacts of restructuring the Oklahoma electric industry. The goal is to provide sufficient objective analysis to the Oklahoma legislature that they may make a more informed decision on the timing and details of any future restructuring. It will also serve to inform other stakeholders on the economic issues surrounding restructuring. The project is being conducted in two phases. The Phase I report (Hadley 2001) concentrated on providing an analysis of the Oklahoma system in the near-term, using only present generation and transmission resources. This Phase II report looks further in the future, incorporating the potential of new

  2. Spin Forming Aluminum Crew Module (CM) Metallic Aft Pressure Vessel Bulkhead (APVBH) - Phase II

    Science.gov (United States)

    Hoffman, Eric K.; Domack, Marcia S.; Torres, Pablo D.; McGill, Preston B.; Tayon, Wesley A.; Bennett, Jay E.; Murphy, Joseph T.

    2015-01-01

    The principal focus of this project was to assist the Multi-Purpose Crew Vehicle (MPCV) Program in developing a spin forming fabrication process for manufacture of the Orion crew module (CM) aft pressure vessel bulkhead. The spin forming process will enable a single piece aluminum (Al) alloy 2219 aft bulkhead resulting in the elimination of the current multiple piece welded construction, simplify CM fabrication, and lead to an enhanced design. Phase I (NASA TM-2014-218163 (1)) of this assessment explored spin forming the single-piece CM forward pressure vessel bulkhead. The Orion MPCV Program and Lockheed Martin (LM) recently made two critical decisions relative to the NESC Phase I work scope: (1) LM selected the spin forming process to manufacture a single-piece aft bulkhead for the Orion CM, and (2) the aft bulkhead will be manufactured from Al 2219. Based on the Program's new emphasis related to the spin forming process, the NESC was asked to conduct a Phase II assessment to assist in the LM manufacture of the aft bulkhead and to conduct a feasibility study into spin forming the Orion CM cone. This activity was approved on June 19, 2013. Dr. Robert Piascik, NASA Technical Fellow for Materials at the Langley Research Center (LaRC), was selected to lead this assessment. The project plan was approved by the NASA Engineering and Safety Center (NESC) Review Board (NRB) on July 18, 2013. The primary stakeholders for this assessment were the NASA and LM MPCV Program offices. Additional benefactors are commercial launch providers developing CM concepts.

  3. The active phasing experiment: Part II. Design and developments

    Science.gov (United States)

    Gonte, F.; Yaitskova, N.; Derie, F.; Araujo, C.; Brast, R.; Delabre, B.; Dierickx, P.; Dupuy, C.; Frank, C.; Guisard, S.; Karban, R.; Noethe, L.; Sedghi, B.; Surdej, I.; Wilhelm, R.; Reyes, M.; Esposito, S.; Langlois, M.

    2006-06-01

    The purpose of the Active Phasing Experiment, designed under the lead of ESO, is to validate wavefront control concepts for ELT class telescopes. This instrument includes an Active Segmented Mirror, located in a pupil image. It will be mounted at a Nasmyth focus of one of the Unit Telescopes of the ESO VLT. APE contains four different types of phasing sensors, which are developed by Istituto Nazionale di Astrofisica in Arcetri, Instituto Astrofisica Canarias, Laboratoire d'Astrophysique de Marseille and ESO. These phasing sensors can be compared simultaneously under identical optical and environmental conditions. All sensors receive telecentric F/15 beams with identical optical quality and intensity. Each phasing sensor can measure segmentation errors of the active segmented mirror and correct them in closed loop. The phasing process is supervised by an Internal Metrology system developed by FOGALE Nanotech and capable of measuring piston steps with an accuracy of a few nanometers. The Active Phasing Experiment is equipped with a turbulence generator to simulate atmospheric seeing between 0.45 and 0.85 arcsec in the laboratory. In addition, the Active Phasing Experiment is designed to control simultaneously with the phasing corrections the guiding and the active optics of one of the VLT Unit Telescopes. This activity is supported by the European Community (Framework Programme 6, ELT Design Study, contract No 011863).

  4. Finite Element Models for Electron Beam Freeform Fabrication Process, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — This Small Business Innovation Research Phase II proposal offers to develop a comprehensive computer simulation methodology based on the finite element method for...

  5. An Instrument for Inspecting Aspheric Optical Surfaces and Components, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — This is a Phase II SBIR proposal to develop an extremely versatile optical inspection tool for aspheric optical components and optics that are not easily inspected...

  6. Expanded Operational Temperature Range for Space Rated Li-Ion Batteries, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Quallion's Phase II proposal calls for expanding the nominal operation range of its space rated lithium ion cells, while maintaining their long life capabilities. To...

  7. Lunar Navigator - A Miniature, Fully Autonomous, Lunar Navigation, Surveyor, and Range Finder System, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Microcosm will use existing hardware and software from related programs to create a prototype Lunar Navigation Sensor (LNS) early in Phase II, such that most of the...

  8. Scaled Model Technology for Flight Research of General Aviation Aircraft, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Our proposed future Phase II activities are aimed at developing a scientifically based "tool box" for flight research using scaled models. These tools will be of...

  9. Solid State Transmitters for Water Vapor and Ozone DIAL Systems, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The focus of this Select Phase II program is to build and deliver laser components both for airborne water vapor and ozone DIAL systems. Specifically, Fibertek...

  10. Large Format LW Type-II SLS FPAs for Space Applications, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — This Phase I SBIR proposes to develop high performance (low dark current, high quantum efficiency, and low NEdT) infrared epitaxy materials based on Type II Strained...

  11. Extreme Environment Damage Index and Accumulation Model for CMC Laminate Fatigue Life Prediction, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Materials Research & Design (MR&D) is proposing in the SBIR Phase II an effort to develop a tool for predicting the fatigue life of C/SiC composite...

  12. Monolithic, High-Speed Fiber-Optic Switching Array for Lidar, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — This NASA SBIR Phase II effort will develop a 1 x 10 prototype non-mechanical fiber optic switch for use with high power lasers. The proposed optical device is a...

  13. Trimodality therapy for malignant pleural mesothelioma: Results from an EORTC phase II multicentre trial

    NARCIS (Netherlands)

    P.E.Y. van Schil (Paul); P. Baas (Paul); R.M. Gaafar (Rabab); A.W.P.M. Maat (Alex); F. Van De Pol (Francien); B. Hasane (B.); H.M. Klomp (Houke); A.M. Abdelrahman (A.); J. Welche (J.); J.P. van Meerbeeck (Jan)

    2010-01-01

    textabstractThe European Organisation for Research and Treatment of Cancer (EORTC; protocol 08031) phase II trial investigated the feasibility of trimodality therapy consisting of induction chemotherapy followed by extrapleural pneumonectomy and post-operative radiotherapy in patients with malignant

  14. Lightweight Design of an HTS Coil for the VASIMR Experiment, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — In this Phase II SBIR contract Tai-Yang Research Company of Tennessee proposes to design, fabricate, and test an ultra-lightweight High Temperature Superconducting...

  15. Deployable Engine Air-Brake for Drag Management Applications, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — ATA Engineering, Inc., (ATA) proposes a Phase II SBIR program to demonstrate an innovative engine air-brake (EAB) technology that uses a deployable swirl vane...

  16. Generic FMS Platform for Evaluation of Autonomous Trajectory-Based Operation Concepts, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of the Phase II work is to develop a generic, advanced Flight Management System (FMS) for the evaluation of autonomous 4D-trajectory based operations...

  17. Battery Separator Membrane Having a Selectable Thermal Shut-Down Temperature, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — This Small Business Innovation Research Phase II proposal to NASA requests $596,750.96 support for Policell Technologies, Inc. to develop a series of separator...

  18. Efficient Integration, Validation and Troubleshooting in Multimodal Distributed Diagnostic Schemes, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — In general, development and validation of diagnostic models for complex safety critical systems are time and cost intensive jobs. The proposed Phase-II effort will...

  19. Development of Diamond Vacuum Differential Amplifier for Harsh Environment Power Electronics, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — In this proposed Phase II, Scientic and Vanderbilt University will develop a novel vacuum field emission differential amplifier (VFEDA) using low electron affinity...

  20. Fiber Coupled Pulse Shaper for Sub-Nanosecond Pulse Lidar, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — This Small Business Innovation Research Phase II effort will develop an all-diode laser and fiber optic based, single frequency, sub-nanosecond pulsed laser source...

  1. 139 the impact of the national fadama ii development project

    African Journals Online (AJOL)

    OLUWOLE AKINNAGBE

    Key words: Impact, National Fadama II Facility, Poverty Alleviation, Agricultural ... production but enhance the income of the ... of employment has the higher incidence of ... This widening gap between ... each group (i.e. those earning ... Source: Field Survey data, 2007 .... increased as evidence has shown that the level.

  2. First results of GERDA Phase II and consistency with background models

    Science.gov (United States)

    Agostini, M.; Allardt, M.; Bakalyarov, A. M.; Balata, M.; Barabanov, I.; Baudis, L.; Bauer, C.; Bellotti, E.; Belogurov, S.; Belyaev, S. T.; Benato, G.; Bettini, A.; Bezrukov, L.; Bode1, T.; Borowicz, D.; Brudanin, V.; Brugnera, R.; Caldwell, A.; Cattadori, C.; Chernogorov, A.; D'Andrea, V.; Demidova, E. V.; Di Marco, N.; Domula, A.; Doroshkevich, E.; Egorov, V.; Falkenstein, R.; Frodyma, N.; Gangapshev, A.; Garfagnini, A.; Gooch, C.; Grabmayr, P.; Gurentsov, V.; Gusev, K.; Hakenmüller, J.; Hegai, A.; Heisel, M.; Hemmer, S.; Hofmann, W.; Hult, M.; Inzhechik, L. V.; Janicskó Csáthy, J.; Jochum, J.; Junker, M.; Kazalov, V.; Kihm, T.; Kirpichnikov, I. V.; Kirsch, A.; Kish, A.; Klimenko, A.; Kneißl, R.; Knöpfle, K. T.; Kochetov, O.; Kornoukhov, V. N.; Kuzminov, V. V.; Laubenstein, M.; Lazzaro, A.; Lebedev, V. I.; Lehnert, B.; Liao, H. Y.; Lindner, M.; Lippi, I.; Lubashevskiy, A.; Lubsandorzhiev, B.; Lutter, G.; Macolino, C.; Majorovits, B.; Maneschg, W.; Medinaceli, E.; Miloradovic, M.; Mingazheva, R.; Misiaszek, M.; Moseev, P.; Nemchenok, I.; Palioselitis, D.; Panas, K.; Pandola, L.; Pelczar, K.; Pullia, A.; Riboldi, S.; Rumyantseva, N.; Sada, C.; Salamida, F.; Salathe, M.; Schmitt, C.; Schneider, B.; Schönert, S.; Schreiner, J.; Schulz, O.; Schütz, A.-K.; Schwingenheuer, B.; Selivanenko, O.; Shevzik, E.; Shirchenko, M.; Simgen, H.; Smolnikov, A.; Stanco, L.; Vanhoefer, L.; Vasenko, A. A.; Veresnikova, A.; von Sturm, K.; Wagner, V.; Wegmann, A.; Wester, T.; Wiesinger, C.; Wojcik, M.; Yanovich, E.; Zhitnikov, I.; Zhukov, S. V.; Zinatulina, D.; Zuber, K.; Zuzel, G.

    2017-01-01

    The GERDA (GERmanium Detector Array) is an experiment for the search of neutrinoless double beta decay (0νββ) in 76Ge, located at Laboratori Nazionali del Gran Sasso of INFN (Italy). GERDA operates bare high purity germanium detectors submersed in liquid Argon (LAr). Phase II of data-taking started in Dec 2015 and is currently ongoing. In Phase II 35 kg of germanium detectors enriched in 76Ge including thirty newly produced Broad Energy Germanium (BEGe) detectors is operating to reach an exposure of 100 kg·yr within about 3 years data taking. The design goal of Phase II is to reduce the background by one order of magnitude to get the sensitivity for T1/20ν = O≤ft( {{{10}26}} \\right){{ yr}}. To achieve the necessary background reduction, the setup was complemented with LAr veto. Analysis of the background spectrum of Phase II demonstrates consistency with the background models. Furthermore 226Ra and 232Th contamination levels consistent with screening results. In the first Phase II data release we found no hint for a 0νββ decay signal and place a limit of this process T1/20ν > 5.3 \\cdot {1025} yr (90% C.L., sensitivity 4.0·1025 yr). First results of GERDA Phase II will be presented.

  3. Semantic Summarization for Context Aware Manipulation of Data, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — NASA's exploration and scientific missions will produce terabytes of information. As NASA enters a new phase of space exploration, managing large amounts of...

  4. Thermo-Acoustic Convertor for Space Power, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — In Phase Sunpower looked at Thermoacoustic Stirling Heat Engines (TASHEs). These ranged from a TASHE which was sized for the heat from a single General Purpose Heat...

  5. Advanced Filtering Techniques Applied to Spaceflight, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — IST-Rolla developed two nonlinear filters for spacecraft orbit determination during the Phase I contract. The theta-D filter and the cost based filter, CBF, were...

  6. Propellant Flow Actuated Piezoelectric Rocket Engine Igniter, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Under a Phase 1 effort, IES successfully developed and demonstrated a spark ignition concept where propellant flow drives a very simple fluid mechanical oscillator...

  7. Surface Modification of Exfoliated Graphite Nano-Reinforcements, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Phase I results showed that two surface treatments, oxidative plasma and reactive finishes, are effective means of modifying the surface chemistry of exfoliated...

  8. SMALL MAIN-BELT ASTEROID SPECTROSCOPIC SURVEY, PHASE II

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set contains visible-wavelength (0.435-0.925 micron) spectra for 1341 main-belt asteroids observed during the second phase of the Small Main-belt Asteroid...

  9. Scalable Lunar Surface Networks and Adaptive Orbit Access, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Based on our proposed innovations and accomplished work in Phase I, we will focus on developing the new MAC protocol and hybrid routing protocol for lunar surface...

  10. MOIDSS?- Mobile Online Intelligent Decision Support System, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — GRID has had a successfully completed Phase I 'Mobile Online Intelligent Decision Support System' (MOIDSS). The system developed into a total solution that supports...

  11. Passive Wireless SAW Humidity Sensors and System, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Phase I demonstrated the technical feasibility of creating surface acoustic wave (SAW) based humidity sensors that respond rapidly (under 0.5 second) and reversibly...

  12. Identification and Reduction of Turbomachinery Noise, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Communities near airports are often exposed to high noise levels due to low flying aircraft in the takeoff and landing phases of flight. Propulsion source noise is...

  13. High-Fidelity Aerodynamic Design with Transition Prediction, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — To enhance aerodynamic design capabilities, Desktop Aeronautics proposes to significantly improve upon the integration (performed in Phase 1) of a new sweep/taper...

  14. Structural Integrity Inspection and Visualization System, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Based on the successful feasibility demonstration in Phase I, Physical Optics Corporation (POC) proposes to continue the development of a novel Structural Integrity...

  15. Distributed Rocket Engine Testing Health Monitoring System, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Leveraging the Phase I achievements of the Distributed Rocket Engine Testing Health Monitoring System (DiRETHMS) including its software toolsets and system building...

  16. Aerodynamic Efficiency Enhancements for Air Vehicles, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The need for aerodynamics-based efficiency enhancements for air vehicles is presented. The results of the Phase I investigation of concepts for morphing aircraft are...

  17. No-Oven, No-Autoclave, Composite Processing, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Cornerstone Research Group Inc. (CRG) proposes to continue the efforts from the 2010 NASA SBIR Phase I topic X5.03, "No-Oven, No-Autoclave (NONA) Composite...

  18. Modular Ultra-High Power Solar Array Architecture, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Deployable Space Systems (DSS) will focus the proposed Phase 2 SBIR program on the hardware-based development and TRL advance of a highly-modularized and...

  19. Laser Femto-Tesla Magnetic Gradiometer (LFMG), Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The LFMG instrument is used to make extremely high resolution scalar magnetic field and difference measurements at the Earthfs surface. The Phase 1 effort included...

  20. Open System of Agile Ground Stations, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The Phase I effort demonstrated, through actual development and tests with a spacecraft system, the technical and programmatic feasibility of developing, within the...

  1. Multipurpose Electric Potential Sensor for Spacecraft Applications, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The original goal of Phase I was to study the feasibility of developing an electric sensor that can be used for as many NASA sensing applications as possible. During...

  2. Heliopause Electrostatic Rapid Transit System (HERTS) (Phase II)

    Data.gov (United States)

    National Aeronautics and Space Administration — Our proposal builds upon our teams technical findings in Phase 1 - that an E-Sail propelled spacecraft can travel 100 AU in less than 10 years or to the Heliopause...

  3. Transportation Life Cycle Assessment (LCA) Synthesis, Phase II

    Science.gov (United States)

    2018-04-24

    The Transportation Life Cycle Assessment (LCA) Synthesis includes an LCA Learning Module Series, case studies, and analytics on the use of the modules. The module series is a set of narrated slideshows on topics related to environmental LCA. Phase I ...

  4. Digital Conically Scanned L-Band Radar, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed effort seeks to develop a digitally steered polarimetric phased array L-Band radar utilizing a novel, high performance architecture leveraging recent...

  5. Contact Stress Design Parameters for Titanium Bearings, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Air-Lock's Phase I effort tested the effects of ball induced contact stresses on Titanium bearing races. The contact stress design limit that would achieve a...

  6. Fiber Optic Shape Sensing for Tethered Marsupial Rovers, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Building upon the successful proof of concept work in Phase I, Luna Innovations Incorporated is proposing to design, build, and test a sensing tether for marsupial...

  7. Low Cost, Light Weight Materials for Mirrors, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — During the phase I program Northwestern and APS, Inc., have manufactured several different materials systems that are lighter than Beryllium and stiffer than...

  8. High Performance Low Mass Nanowire Enabled Heatpipe, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Heat pipes are widely used for passive, two-phase electronics cooling. As advanced high power, high performance electronics in space based and terrestrial...

  9. Conversion of Phase II Unsteady Aerodynamics Experiment Data to Common Format; TOPICAL

    International Nuclear Information System (INIS)

    Hand, M. M.

    1999-01-01

    A vast amount of aerodynamic, structural, and turbine performance data were collected during three phases of the National Renewable Energy Laboratory's Unsteady Aerodynamics Experiment (UAE). To compare data from the three phases, a similar format of engineering unit data is required. The process of converting Phase II data from a previous engineering unit format to raw integer counts is discussed. The integer count files can then be input to the new post-processing software, MUNCH. The resulting Phase II engineering unit files are in a common format with current and future UAE engineering unit files. An additional objective for changing the file format was to convert the Phase II data from English units to SI units of measurement

  10. PBFA [Particle Beam Fusion Accelerator] II: The pulsed power characterization phase

    International Nuclear Information System (INIS)

    Martin, T.H.; Turman, B.N.; Goldstein, S.A.

    1987-01-01

    The Particle Beam Fusion Accelerator II, PBFA II, is now the largest pulsed power device in operation. This paper summarizes its first year and a half of operation for the Department of Energy (DOE) Inertial Confinement Fusion (ICF) program. Thirty-six separate modules provide 72 output pulses that combine to form a 100 TW output pulse at the accelerator center. PBFA II was successfully test fired for the first time on December 11, 1985. This test completed the construction phase (Phase 1) within the expected schedule and budget. The accelerator checkout phase then started (Phase 2). The first priority during checkout was to bring the Phase 1 subsystems into full operation. The accelerator was first tested to determine overall system performance. Next, subsystems that were not performing adequately were modified. The accelerator is now being used for ion diode studies. 32 refs

  11. Hybrid Prediction Method for Aircraft Interior Noise, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The goal of the project is research and development of methods for application of the Hybrid FE-SEA method to aircraft vibro-acoustic problems. This proposal...

  12. Aeroelastic Simulation Tool for Inflatable Ballute Aerocapture, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — This project will develop a much-needed multidisciplinary analysis tool for predicting the impact of aeroelastic effects on the functionality of inflatable...

  13. Aircraft Electrical Power System Diagnostics and Health Management, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of the project is the development of an open architecture, computational toolbox for design and implementation of diagnostic and prognostic algorithms...

  14. Adaptive Distributed Environment for Procedure Training, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The ADEPT project aims to improve the state-of-the-art with respect to capabilities and costs of scenario-based training in support of future space exploration...

  15. Physics-Based Pneumatic Hammer Instability Model, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of this project is to develop a physics-based pneumatic hammer instability model that accurately predicts the stability of hydrostatic bearings...

  16. High Efficiency Lighting with Integrated Adaptive Control (HELIAC), Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The proposed project is the continued development of the High Efficiency Lighting with Integrated Adaptive Control (HELIAC) system. Solar radiation is not a viable...

  17. Task-Specific Asteroid Simulants for Ground Testing, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The project will produce at least four asteroid simulants at high fidelity for mineral content and particle size, created through standardized inputs and documented...

  18. Regional Dialogue on the Information Society (DIRSI) - Phase II ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    The Regional Dialogue on the Information Society Network (DIRSI) is a ... the poorest sectors of society, the project will focus on innovative policy solutions ... their Impact on the Development of the Mobile Telecommunications Services Sector.

  19. Quantifiable and Reliable Structural Health Management Systems, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Under Project Constellation, NASA is developing a new generation of spacecraft for human spaceflight. A significant percentage of the structures used in these...

  20. Recommended Practices to Improve Nurse Tank Safety: Phase II

    Science.gov (United States)

    2013-12-01

    This project addressed four topics: Pinhole leaks in nurse tanks were studied by radiography, serial milling, and side-angle ultrasound. These measurements indicated that welding surfaces contaminated by water, mill scale, rust, or other contamin...

  1. The Potential Economic Impact of Electricity Restructuring in the State of Oklahoma: Phase II Report; FINAL

    International Nuclear Information System (INIS)

    Hadley, SW

    2001-01-01

    Because of the recent experiences of several states undergoing restructuring (e.g., higher prices, greater volatility, lower reliability), concerns have been raised in states currently considering restructuring as to whether their systems are equally vulnerable. Factors such as local generation costs, transmission constraints, market concentration, and market design can all play a role in the success or failure of the market. These factors along with the mix of generation capacity supplying the state will influence the relative prices paid by consumers. The purpose of this project is to provide a model and process to evaluate the potential price and economic impacts of restructuring the Oklahoma electric industry. The Phase I report concentrated on providing an analysis of the Oklahoma system in the near-term, using only present generation resources and customer demands. This Phase II study analyzed the Oklahoma power market in 2010, incorporating the potential of new generation resources and customer responses. Five key findings of this Phase II were made: (1) Projected expansion in generating capacity exceeds by over 3,000 MW the demands within the state plus the amount that could be exported with the current transmission system. (2) Even with reduced new plant construction, most new plants could lose money (although residential consumers would see lower rates) unless they have sufficient market power to raise their prices without losing significant market share (Figure S-1). (3) If new plants can raise prices to stay profitable, existing low-cost coal and hydro plants will have very high profits. Average prices to customers could be 5% to 25% higher than regulated rates (Figure S-1). If the coal and hydro plants are priced at cost-based rates (through long-term contracts or continued regulation) while all other plants use market-based rates then prices are lower. (4) Customer response to real-time prices can lower the peak capacity requirements by around 9

  2. Ultra-secure RF Tags for Safeguards and Security - SBIR Phase II Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Twogood, Richard E [Dirac Solutions Inc., Pleasanton, CA (United States)

    2015-01-27

    This is the Final Report for the DOE Phase II SBIR project “Ultra-secure RF Tags for Safeguards and Security.” The topics covered herein include technical progress made, progress against the planned milestones and deliverables, project outcomes (results, collaborations, intellectual property, etc.), and a discussion on future expectations of deployment and impacts of the results of this work. In brief, all planned work for the project was successfully completed, on or ahead of schedule and on budget. The major accomplishment was the successful development of a very advanced passive ultra-secure RFID tag system with combined security features unmatched by any commercially available ones. These tags have high-level dynamic encrypted authentication, a novel tamper-proofing mechanism, system software including graphical user interfaces and networking, and integration with a fiber-optic seal mechanism. This is all accomplished passively (with no battery) by incorporating sophisticated hardware in the tag which harvests the energy from the RFID readers that are interrogating the tag. Based on initial feedback (and deployments) at DOE’s Lawrence Livermore National Laboratory (LLNL), it is anticipated these tags and their offspring will meet DOE and international community needs for highly secure RFID systems. Beyond the accomplishment of those original objectives for the ultra-secure RF tags, major new spin-off thrusts from the original work were identified and successfully pursued with the cognizance of the DOE sponsor office. In particular, new classes of less sophisticated RFID tags were developed whose lineage derives from the core R&D thrusts of this SBIR. These RF “tag variants” have some, but not necessarily all, of the advanced characteristics described above and can therefore be less expensive and meet far wider markets. With customer pull from the DOE and its national laboratories, new RFID tags and systems (including custom readers and software) for

  3. GERDA phase II detectors: Behind the production and characterisation at low background conditions

    Energy Technology Data Exchange (ETDEWEB)

    Maneschg, Werner [Max-Planck-Institut für Kernphysik, Saupfercheckweg 1, 69117 Heidelberg (Germany); Collaboration: GERDA Collaboration; and others

    2013-08-08

    The low background GERmanium Detector Array (GERDA) at Laboratori Nazionali del Gran Sasso (LNGS) is designed to search for the rare neutrinoless double beta decay (0νββ) in {sup 76}Ge. Bare germanium diodes are operated in liquid argon which is used as coolant, as passive and soon active as well shield against external radiation. Currently, Phase I of the experiment is running using ∼15 kg of co-axial High Purity Germanium diodes. In order to increase the sensitivity of the experiment 30 Broad Energy Germanium (BEGe) diodes will be added within 2013. This presentation reviews the production chain of the new BEGe detectors from isotopic enrichment to diode production and testing. As demonstrated all steps were carefully planned in order to minimize the exposure of the enriched germanium to cosmic radiation. Following this premise, acceptance and characterisation measurement of the newly produced diodes have been performed within the HEROICA project in the Belgian underground laboratory HADES close to the diode manufacturer. The test program and the results from a subset of the recently terminated GERDA Phase II BEGe survey will be presented.

  4. Search for dark photons using data from CRESST-II Phase 2

    Science.gov (United States)

    Gütlein, A.; Angloher, G.; Bento, A.; Bucci, C.; Canonica, L.; Defay, X.; Erb, A.; Feilitzsch, F. v.; Ferreiro Iachellini, N.; Gorla, P.; Hauff, D.; Jochum, J.; Kiefer, M.; Kluck, H.; Kraus, H.; Lanfranchi, J.-C.; Loebell, J.; Mancuso, M.; Münster, A.; Pagliarone, C.; Petricca, F.; Potzel, W.; Pröbst, F.; Puig, R.; Reindl, F.; Schäffner, K.; Schieck, J.; Schönert, S.; Seidel, W.; Stahlberg, M.; Stodolsky, L.; Strandhagen, C.; Strauss, R.; Tanzke, A.; Trinh Thi, H. H.; Türkoǧlu, C.; Uffinger, M.; Ulrich, A.; Usherov, I.; Wawoczny, S.; Willers, M.; Wüstrich, M.; Zöller, A.

    2017-09-01

    Understanding the nature and origin of dark matter is one of the most important challenges for modern particle physics. During the previous decade the sensitivities of direct dark matter searches have improved by several orders of magnitude. These experiments focus their work mainly on the search for dark-matter particles interacting with nuclei (e.g. Weakly Interacting Massive Particles, WIMPs). However, there exists a large variety of different candidates for dark-matter particles. One of these candidates, the so-called dark photon, is a long-lived vector boson with a kinetic mixing to the standard-model photon. In this work we present the preliminary results of our search for dark photons. Using data from the direct dark matter search CRESST-II Phase 2 we can improve the existing constraints for the kinetic mixing for dark-photon masses between 0.3 and 0.5 keV/c2. In addition, we also present projected sensitivities for the next phases of the CRESST-III experiment showing great potential to improve the sensitivity for dark-photon masses below 1 keV.

  5. Intermediate Photovoltaic System Application Experiment. Oklahoma Center for Science and Arts. Phase II. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1984-01-01

    This report presents the key results of the Phase II efforts for the Intermediate PV System Applications Experiment at the Oklahoma Center for Science and Arts (OCSA). This phase of the project involved fabrication, installation and integration of a nominal 140 kW flat panel PV system made up of large, square polycrystalline-silicon solar cell modules, each nominally 61 cm x 122 cm in size. The output of the PV modules, supplied by Solarex Corporation, was augmented, 1.35 to 1 at peak, by a row of glass reflectors, appropriately tilted northward. The PV system interfaces with the Oklahoma Gas and Electric Utility at the OCSA main switchgear. Any excess power generated by the system is fed into the utility under a one to one buyback arrangement. Except for a shortfall in the system output, presently suspected to be due to the poor performance of the modules, no serious problems were encountered. Certain value engineering changes implemented during construction and early operational failure events associated with the power conditioning system are also described. The system is currently undergoing extended testing and evaluation.

  6. Investigation of HV/HR-CMOS technology for the ATLAS Phase-II Strip Tracker Upgrade

    International Nuclear Information System (INIS)

    Fadeyev, V.; Galloway, Z.; Grabas, H.; Grillo, A.A.; Liang, Z.; Martinez-Mckinney, F.; Seiden, A.; Volk, J.; Affolder, A.; Buckland, M.; Meng, L.; Arndt, K.; Bortoletto, D.; Huffman, T.; John, J.; McMahon, S.; Nickerson, R.; Phillips, P.; Plackett, R.; Shipsey, I.

    2016-01-01

    ATLAS has formed strip CMOS project to study the use of CMOS MAPS devices as silicon strip sensors for the Phase-II Strip Tracker Upgrade. This choice of sensors promises several advantages over the conventional baseline design, such as better resolution, less material in the tracking volume, and faster construction speed. At the same time, many design features of the sensors are driven by the requirement of minimizing the impact on the rest of the detector. Hence the target devices feature long pixels which are grouped to form a virtual strip with binary-encoded z position. The key performance aspects are radiation hardness compatibility with HL-LHC environment, as well as extraction of the full hit position with full-reticle readout architecture. To date, several test chips have been submitted using two different CMOS technologies. The AMS 350 nm is a high voltage CMOS process (HV-CMOS), that features the sensor bias of up to 120 V. The TowerJazz 180 nm high resistivity CMOS process (HR-CMOS) uses a high resistivity epitaxial layer to provide the depletion region on top of the substrate. We have evaluated passive pixel performance, and charge collection projections. The results strongly support the radiation tolerance of these devices to radiation dose of the HL-LHC in the strip tracker region. We also describe design features for the next chip submission that are motivated by our technology evaluation.

  7. Investigation of HV/HR-CMOS technology for the ATLAS Phase-II Strip Tracker Upgrade

    Science.gov (United States)

    Fadeyev, V.; Galloway, Z.; Grabas, H.; Grillo, A. A.; Liang, Z.; Martinez-Mckinney, F.; Seiden, A.; Volk, J.; Affolder, A.; Buckland, M.; Meng, L.; Arndt, K.; Bortoletto, D.; Huffman, T.; John, J.; McMahon, S.; Nickerson, R.; Phillips, P.; Plackett, R.; Shipsey, I.; Vigani, L.; Bates, R.; Blue, A.; Buttar, C.; Kanisauskas, K.; Maneuski, D.; Benoit, M.; Di Bello, F.; Caragiulo, P.; Dragone, A.; Grenier, P.; Kenney, C.; Rubbo, F.; Segal, J.; Su, D.; Tamma, C.; Das, D.; Dopke, J.; Turchetta, R.; Wilson, F.; Worm, S.; Ehrler, F.; Peric, I.; Gregor, I. M.; Stanitzki, M.; Hoeferkamp, M.; Seidel, S.; Hommels, L. B. A.; Kramberger, G.; Mandić, I.; Mikuž, M.; Muenstermann, D.; Wang, R.; Zhang, J.; Warren, M.; Song, W.; Xiu, Q.; Zhu, H.

    2016-09-01

    ATLAS has formed strip CMOS project to study the use of CMOS MAPS devices as silicon strip sensors for the Phase-II Strip Tracker Upgrade. This choice of sensors promises several advantages over the conventional baseline design, such as better resolution, less material in the tracking volume, and faster construction speed. At the same time, many design features of the sensors are driven by the requirement of minimizing the impact on the rest of the detector. Hence the target devices feature long pixels which are grouped to form a virtual strip with binary-encoded z position. The key performance aspects are radiation hardness compatibility with HL-LHC environment, as well as extraction of the full hit position with full-reticle readout architecture. To date, several test chips have been submitted using two different CMOS technologies. The AMS 350 nm is a high voltage CMOS process (HV-CMOS), that features the sensor bias of up to 120 V. The TowerJazz 180 nm high resistivity CMOS process (HR-CMOS) uses a high resistivity epitaxial layer to provide the depletion region on top of the substrate. We have evaluated passive pixel performance, and charge collection projections. The results strongly support the radiation tolerance of these devices to radiation dose of the HL-LHC in the strip tracker region. We also describe design features for the next chip submission that are motivated by our technology evaluation.

  8. Investigation of HV/HR-CMOS technology for the ATLAS Phase-II Strip Tracker Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Fadeyev, V., E-mail: fadeyev@ucsc.edu [Santa Cruz Institute for Particle Physics, University of California, Santa Cruz, CA 95064 (United States); Galloway, Z.; Grabas, H.; Grillo, A.A.; Liang, Z.; Martinez-Mckinney, F.; Seiden, A.; Volk, J. [Santa Cruz Institute for Particle Physics, University of California, Santa Cruz, CA 95064 (United States); Affolder, A.; Buckland, M.; Meng, L. [Department of Physics, University of Liverpool, O. Lodge Laboratory, Oxford Street, Liverpool L69 7ZE (United Kingdom); Arndt, K.; Bortoletto, D.; Huffman, T.; John, J.; McMahon, S.; Nickerson, R.; Phillips, P.; Plackett, R.; Shipsey, I. [Department of Physics, Oxford University, Oxford (United Kingdom); and others

    2016-09-21

    ATLAS has formed strip CMOS project to study the use of CMOS MAPS devices as silicon strip sensors for the Phase-II Strip Tracker Upgrade. This choice of sensors promises several advantages over the conventional baseline design, such as better resolution, less material in the tracking volume, and faster construction speed. At the same time, many design features of the sensors are driven by the requirement of minimizing the impact on the rest of the detector. Hence the target devices feature long pixels which are grouped to form a virtual strip with binary-encoded z position. The key performance aspects are radiation hardness compatibility with HL-LHC environment, as well as extraction of the full hit position with full-reticle readout architecture. To date, several test chips have been submitted using two different CMOS technologies. The AMS 350 nm is a high voltage CMOS process (HV-CMOS), that features the sensor bias of up to 120 V. The TowerJazz 180 nm high resistivity CMOS process (HR-CMOS) uses a high resistivity epitaxial layer to provide the depletion region on top of the substrate. We have evaluated passive pixel performance, and charge collection projections. The results strongly support the radiation tolerance of these devices to radiation dose of the HL-LHC in the strip tracker region. We also describe design features for the next chip submission that are motivated by our technology evaluation.

  9. S-1 project. Volume II. Hardware. 1979 annual report

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    This volume includes highlights of the design of the Mark IIA uniprocessor (SMI-2), and the SCALD II user's manual. SCALD (structured computer-aided logic design system) cuts the cost and time required to design logic by letting the logic designer express ideas as naturally as possible, and by eliminating as many errors as possible - through consistency checking, simulation, and timing verification - before the hardware is built. (GHT)

  10. Accelerator Physics Challenges for the NSLS-II Project

    Energy Technology Data Exchange (ETDEWEB)

    Krinsky,S.

    2009-05-04

    The NSLS-II is an ultra-bright synchrotron light source based upon a 3-GeV storage ring with a 30-cell (15 super-period) double-bend-achromat lattice with damping wigglers used to lower the emittance below 1 nm. In this paper, we discuss the accelerator physics challenges for the design including: optimization of dynamic aperture; estimation of Touschek lifetime; achievement of required orbit stability; and analysis of ring impedance and collective effects.

  11. The EMIL project at BESSY II: Beamline design and performance

    Energy Technology Data Exchange (ETDEWEB)

    Hendel, Stefan, E-mail: stefan.hendel@helmholtz-berlin.de; Schäfers, Franz; Reichardt, Gerd; Scheer, Michael; Bahrdt, Johannes; Lips, Klaus [Helmholtz-Zentrum Berlin für Materialien und Energie GmbH, Albert-Einstein-Straße 15, 12489 Berlin (Germany); Hävecker, Michael [Helmholtz-Zentrum Berlin für Materialien und Energie GmbH, Albert-Einstein-Straße 15, 12489 Berlin (Germany); MPI for Chemical Energy Conversion, Stiftstrasse 34-36, 45470 Mülheim an der Ruhr (Germany)

    2016-07-27

    The Energy Materials In-Situ Laboratory Berlin (EMIL) at BESSY-II is currently under construction. Two canted undulators for soft- and hard X-rays will be installed into the BESSY II storage ring in one straight section, complex beamlines with more than twenty optical elements will be set up and a new laboratory building attached to BESSY II will host three endstations and a large UHV-transfer system connecting various HV- and UHV-deposition systems. The undulators, UE48 and U17, provide a broad energy spectrum of 80 - 10000 eV, of which the harder radiation (>700 eV) is provided by a cryogenic in-vacuum device. Three monochromators (two plane grating monochromators (PGM) and one LN{sub 2}-cooled double crystal monochromator (DCM)) disperse the radiation into separate pathways of 65 m length, while downstream of the monochromators split-mirror chambers distribute the photon beam to one (or simultaneously to two) of five upcoming endstations. Three of these endstations are designed for the full energy range with spatial overlap of the soft and hard foci, whereas one endstation (PEEM) uses only the soft and another one (PINK) only the hard branch, respectively.

  12. Site Characterization of the Source Physics Experiment Phase II Location Using Seismic Reflection Data

    Science.gov (United States)

    Sexton, E. A.; Snelson, C. M.; Chipman, V.; Emer, D. F.; White, R. L.; Emmitt, R.; Wright, A. A.; Drellack, S.; Huckins-Gang, H.; Mercadante, J.; Floyd, M.; McGowin, C.; Cothrun, C.; Bonal, N.

    2013-12-01

    An objective of the Source Physics Experiment (SPE) is to identify low-yield nuclear explosions from a regional distance. Low-yield nuclear explosions can often be difficult to discriminate among the clutter of natural and man-made explosive events (e.g., earthquakes and mine blasts). The SPE is broken into three phases. Phase I has provided the first of the physics-based data to test the empirical models that have been used to discriminate nuclear events. The Phase I series of tests were placed within a highly fractured granite body. The evolution of the project has led to development of Phase II, to be placed within the opposite end member of geology, an alluvium environment, thereby increasing the database of waveforms to build upon in the discrimination models. Both the granite and alluvium sites have hosted nearby nuclear tests, which provide comparisons for the chemical test data. Phase III of the SPE is yet to be determined. For Phase II of the experiment, characterization of the location is required to develop the geologic/geophysical models for the execution of the experiment. Criteria for the location are alluvium thickness of approximately 170 m and a water table below 170 m; minimal fracturing would be ideal. A P-wave mini-vibroseis survey was conducted at a potential site in alluvium to map out the subsurface geology. The seismic reflection profile consisted of 168 geophone stations, spaced 5 m apart. The mini-vibe was a 7,000-lb peak-force source, starting 57.5 m off the north end of the profile and ending 57.5 m past the southern-most geophone. The length of the profile was 835 m. The source points were placed every 5 m, equally spaced between geophones to reduce clipping. The vibroseis sweep was from 20 Hz down to 180 Hz over 8 seconds, and four sweeps were stacked at each shot location. The shot gathers show high signal-to-noise ratios with clear first arrivals across the entire spread and the suggestion of some shallow reflectors. The data were

  13. [To live well: health care or life project? Part II].

    Science.gov (United States)

    Viniegra Velázquez, Leonardo

    On the basis that life project as the driving force behind the life experience, the quest for human dignity is the way for true progress and the improvement of human condition. It's pointed out the need to be aware of the meaning of life understanding the motives behind our will to live that is the antecedent of life project. The proposed life project is a cognitive adventure, capable of transcending consumerism, individualism and passivity, toward the creation of a more inclusive world where the improvement spiritual, intellectual and moral can be viable. Said life project entails: a) A primary need: to link oneself with like-minded people that synergize against the prevailing order b) A core: The everlasting struggle for sublimated dignity c) A desideratum: The well-being of the majority d) An unavoidable purpose: The creation of a suitable world build on different ethical, political, lawful, cognitive and ecological foundations. In conclusion, this paper analyzes the influence of projects with an alternate proposal to the endeavors centered in healthcare that favor individualism, passivity and the current status quo. The best example of said alternate proposals is the commonly called "good death". Copyright © 2016 Hospital Infantil de México Federico Gómez. Publicado por Masson Doyma México S.A. All rights reserved.

  14. Cyprus natural analogue project (CNAP). Phase III final report

    International Nuclear Information System (INIS)

    Alexander, W.R.; Milodowski, A.E.; Pitty, A.F.

    2012-01-01

    The CNAP Phase III project was carried out following identification of the requirement to support ongoing laboratory and modelling efforts on the potential reaction of the bentonite buffer with cementitious leachates in the repository EBS. Although it is known that the higher pH (12.5 to 13) leachates from OPC cement will degrade bentonite, it is unclear if this will also be the case for the lower pH (10 to 11) leachates typical of low alkali cements. Ongoing laboratory and URL programmes which are currently investigating this face the obstacle of slow kinetics and the production of short-lived metastable phases, meaning obtaining unambiguous results may take decades. This is exacerbated by the limitations of the thermodynamic databases for minerals of interest to models of bentonite/low alkali cement leachate reaction. It was therefore decided to implement a focussed NA study on bentonite/low alkali cement leachate reaction to provide indications of likely long-term reaction products and reaction pathways to provide feedback on the existing short-term investigations noted above and to ascertain if any critical path R and D needs to be instigated now. The results of the analyses presented here suggest that there has been very limited alkaline groundwater reaction with the bentonite. This is generally supported by both the geomorphological evidence and the natural decay series data which imply groundwater groundwater/rock interaction in the last 10 5 a. When integrated with the novel data currently being produced in the BIGRAD project, the CNAP data tend to indicate that any long-term bentonite reaction in low alkali cement leachates is minimal. (orig.)

  15. Cyprus natural analogue project (CNAP). Phase III final report

    Energy Technology Data Exchange (ETDEWEB)

    Alexander, W R [Bedrock Geosciences, Auenstein (Switzerland); Milodowski, A E [British Geological Survey, Keyworth (United Kingdom); Pitty, A F [Pitty (EIA) Consulting, Norwich (United Kingdom)

    2012-01-15

    The CNAP Phase III project was carried out following identification of the requirement to support ongoing laboratory and modelling efforts on the potential reaction of the bentonite buffer with cementitious leachates in the repository EBS. Although it is known that the higher pH (12.5 to 13) leachates from OPC cement will degrade bentonite, it is unclear if this will also be the case for the lower pH (10 to 11) leachates typical of low alkali cements. Ongoing laboratory and URL programmes which are currently investigating this face the obstacle of slow kinetics and the production of short-lived metastable phases, meaning obtaining unambiguous results may take decades. This is exacerbated by the limitations of the thermodynamic databases for minerals of interest to models of bentonite/low alkali cement leachate reaction. It was therefore decided to implement a focussed NA study on bentonite/low alkali cement leachate reaction to provide indications of likely long-term reaction products and reaction pathways to provide feedback on the existing short-term investigations noted above and to ascertain if any critical path R and D needs to be instigated now. The results of the analyses presented here suggest that there has been very limited alkaline groundwater reaction with the bentonite. This is generally supported by both the geomorphological evidence and the natural decay series data which imply groundwater groundwater/rock interaction in the last 10{sup 5} a. When integrated with the novel data currently being produced in the BIGRAD project, the CNAP data tend to indicate that any long-term bentonite reaction in low alkali cement leachates is minimal. (orig.)

  16. Grassmann phase space methods for fermions. II. Field theory

    Energy Technology Data Exchange (ETDEWEB)

    Dalton, B.J., E-mail: bdalton@swin.edu.au [Centre for Quantum and Optical Science, Swinburne University of Technology, Melbourne, Victoria 3122 (Australia); Jeffers, J. [Department of Physics, University of Strathclyde, Glasgow G4ONG (United Kingdom); Barnett, S.M. [School of Physics and Astronomy, University of Glasgow, Glasgow G12 8QQ (United Kingdom)

    2017-02-15

    In both quantum optics and cold atom physics, the behaviour of bosonic photons and atoms is often treated using phase space methods, where mode annihilation and creation operators are represented by c-number phase space variables, with the density operator equivalent to a distribution function of these variables. The anti-commutation rules for fermion annihilation, creation operators suggests the possibility of using anti-commuting Grassmann variables to represent these operators. However, in spite of the seminal work by Cahill and Glauber and a few applications, the use of Grassmann phase space methods in quantum-atom optics to treat fermionic systems is rather rare, though fermion coherent states using Grassmann variables are widely used in particle physics. This paper presents a phase space theory for fermion systems based on distribution functionals, which replace the density operator and involve Grassmann fields representing anti-commuting fermion field annihilation, creation operators. It is an extension of a previous phase space theory paper for fermions (Paper I) based on separate modes, in which the density operator is replaced by a distribution function depending on Grassmann phase space variables which represent the mode annihilation and creation operators. This further development of the theory is important for the situation when large numbers of fermions are involved, resulting in too many modes to treat separately. Here Grassmann fields, distribution functionals, functional Fokker–Planck equations and Ito stochastic field equations are involved. Typical applications to a trapped Fermi gas of interacting spin 1/2 fermionic atoms and to multi-component Fermi gases with non-zero range interactions are presented, showing that the Ito stochastic field equations are local in these cases. For the spin 1/2 case we also show how simple solutions can be obtained both for the untrapped case and for an optical lattice trapping potential.

  17. Grassmann phase space methods for fermions. II. Field theory

    International Nuclear Information System (INIS)

    Dalton, B.J.; Jeffers, J.; Barnett, S.M.

    2017-01-01

    In both quantum optics and cold atom physics, the behaviour of bosonic photons and atoms is often treated using phase space methods, where mode annihilation and creation operators are represented by c-number phase space variables, with the density operator equivalent to a distribution function of these variables. The anti-commutation rules for fermion annihilation, creation operators suggests the possibility of using anti-commuting Grassmann variables to represent these operators. However, in spite of the seminal work by Cahill and Glauber and a few applications, the use of Grassmann phase space methods in quantum-atom optics to treat fermionic systems is rather rare, though fermion coherent states using Grassmann variables are widely used in particle physics. This paper presents a phase space theory for fermion systems based on distribution functionals, which replace the density operator and involve Grassmann fields representing anti-commuting fermion field annihilation, creation operators. It is an extension of a previous phase space theory paper for fermions (Paper I) based on separate modes, in which the density operator is replaced by a distribution function depending on Grassmann phase space variables which represent the mode annihilation and creation operators. This further development of the theory is important for the situation when large numbers of fermions are involved, resulting in too many modes to treat separately. Here Grassmann fields, distribution functionals, functional Fokker–Planck equations and Ito stochastic field equations are involved. Typical applications to a trapped Fermi gas of interacting spin 1/2 fermionic atoms and to multi-component Fermi gases with non-zero range interactions are presented, showing that the Ito stochastic field equations are local in these cases. For the spin 1/2 case we also show how simple solutions can be obtained both for the untrapped case and for an optical lattice trapping potential.

  18. Forensic relevance of glucuronidation in phase-II-metabolism of alcohols and drugs.

    Science.gov (United States)

    Kaeferstein, Herbert

    2009-04-01

    Forensic toxicology means detecting toxic or pharmacologically active substances in body fluids and organs and the evaluation and judgement of the respective results. In the legal judgement, not only the taken in active drugs, but also their metabolites are to be included. Regarding metabolism one distinguishes phase-I- and phase-II-metabolism. In the phase-I-metabolism, active substances are converted by oxidation, reduction or hydrolysis, but influencing the polarity of more lipophilic substances often not decisively. The pharmacological activity is often preserved or even increased. In phase-II-metabolism a highly hydrophilic substance--mostly glucuronic acid--is coupled to the active substances or the respective phase-I-metabolites. This reaction step decisively increases hydrophilicity of lipophilic substances, thus enhancing renal elimination and often also abolishing pharmacologically and/or toxicologically effects. Nevertheless the interaction of different drugs and alcohols in glucuronidation and the glucuronides of phase-II-metabolism still do not play a substantial role in the forensic-toxicological analysis and interpretation of results so far. However, in vitro investigations since 1999 in our lab show that such interactions are not unlikely. For valid interpretation of complex cases in the future it may become necessary not only to quantify drugs and the phase-I-metabolites but also the phase-II-metabolites and discuss possible interactions in the metabolism.

  19. An Experimental Evaluation of Hyperactivity and Food Additives. 1977-Phase II.

    Science.gov (United States)

    Harley, J. Preston; And Others

    Phase II of a study on the effectiveness of B. Feingold's recommended diet for hyperactive children involved the nine children (mean age 9 years) who had shown the "best" response to diet manipulation in Phase I. Each child served as his own control and was challenged with specified amounts of placebo and artificial color containing food…

  20. TWRS phase 1 infrastructure project (W-519) characterization

    International Nuclear Information System (INIS)

    Mitchell, C.J.

    1998-01-01

    In order to treat the mixed radioactive and hazardous waste stored in 177 underground tanks, the Tank Waste Remediation System (TWRS) program is developing a 'demonstration' site for treatment and immobilization of these wastes by a private contractor. Project W-519 is providing the infrastructure support to this site by developing the designs and emplacing required pipelines, roads, electrical, etc. In support of the TWRS Phase 1 Infrastructure Project (W-519) Characterization, Numatec Hanford Corporation (NHC) contracted with Waste Management Federal Services, Inc., Northwest Operations (WMNW) to investigate a number of locations in and just outside the 200 East Area eastern fenceline boundary. These areas consisted of known or suspected waste lines or waste sites that could potentially impact the construction and emplacement of the proposed facility improvements, including waterlines and roads. These sites were all located subsurface and sugaring would be required to obtain sample material from the desired depth. The soils would then be sampled and submitted to the laboratory for analysis of radioactivity

  1. Final Technical Report - Kotzebue Wind Power Project - Volume II

    Energy Technology Data Exchange (ETDEWEB)

    Rana Zucchi, Global Energy Concepts, LLC; Brad Reeve, Kotzebue Electric Association; DOE Project Officer - Doug Hooker

    2007-10-31

    The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and community outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.

  2. SEL/Project Language. Level II, Kindergarten, Teacher's Handbook.

    Science.gov (United States)

    Valladares, Ann E.; Lynch, Helen C.

    The Teacher's Handbook is part of the publication series of the Southeastern Education Laboratory/Project Language (SEL/PL), an 8-year language-centered program designed to alleviate the language deficiencies of disadvantaged children between the ages of four and eleven. For teachers utilizing SEL/PL, the Handbook provides a research summary and…

  3. Differential roles of phase I and phase II enzymes in 3,4-methylendioxymethamphetamine-induced cytotoxicity.

    NARCIS (Netherlands)

    Antolino Lobo, I.; Meulenbelt, J.; Nijmeijer, S.M.; Scherpenisse, P.; van den Berg, M.; van Duursen, M.B.M.

    2010-01-01

    Metabolism plays an important role in the toxic effects caused by 3,4-methylenedioxymethamphetamine (MDMA). Most research has focused on the involvement of CYP2D6 enzyme in MDMA bioactivation, and less is known about the contribution of other cytochrome P450 (P450) and phase II metabolism. In this

  4. China Public Budget Reform Program (CPBR) - Phase II | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    The Government of China has adopted a national reform program aimed at making budgeting more transparent and accountable through public involvement and enhanced oversight. Building on work carried out under Phase I (102965), the China Development Research Foundation (CDRF) will analyze China's current ...

  5. Lebanese Palestinian Dialogue Committee (LPDC) - Phase II | IDRC ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    During Phase I (100971), LPDC set up a website and commissioned papers from Lebanese and Palestinian researchers on such subjects as "non-Ids" - Palestinians with no official documents - and employment issues in Lebanon. LPDC was instrumental in coordinating the efforts of Lebanese stakeholders during the Nahr ...

  6. Public Report on Health (India) - Phase II | IDRC - International ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    The Public Report on Health aims to draw federal and state attention to the health needs of ordinary people, so as to develop evidence-based solutions for meeting those needs. The Intensive Village Study carried out during the first phase of ... Outputs. Reports. Public report on health : final technical report. Download PDF ...

  7. Tracking costs of alternatively fueled buses in Florida - phase II.

    Science.gov (United States)

    2013-04-01

    The goal of this project is to continue collecting and reporting the data on the performance and costs of alternatively fueled public transit vehicles in the state in a consistent manner in order to keep the Bus Fuels Fleet Evaluation Tool (BuFFeT) c...

  8. Preparation of silybin phase II metabolites: Streptomyces catalyzed glucuronidation

    Czech Academy of Sciences Publication Activity Database

    Charrier, C.; Azerad, R.; Marhol, Petr; Purchartová, K.; Kuzma, Marek; Křen, Vladimír

    2014-01-01

    Roč. 102, APR 2014 (2014), s. 167-173 ISSN 1381-1177 R&D Projects: GA MŠk(CZ) LD13041; GA ČR(CZ) GAP301/11/0662 Institutional support: RVO:61388971 Keywords : Silybin diastereomers * Silibinin * Silymarin Subject RIV: CE - Biochemistry Impact factor: 2.128, year: 2014

  9. Recent Advances in Understanding of Kinetic Interplay Between Phase II Metabolism and Efflux Transport.

    Science.gov (United States)

    Wang, Shuai; Xing, Huijie; Zhao, Mengjing; Lu, Danyi; Li, Zhijie; Dong, Dong; Wu, Baojian

    2016-01-01

    Mechanistic understanding of the metabolism-transport interplay assumes great importance in pharmaceutical fields because the knowledge can help to interpret drug/xenobiotic metabolism and disposition studies as well as the drug-drug interactions in vivo. About 10 years ago, it started to recognize that cellular phase II metabolism is strongly influenced by the excretion (efflux transport) of generated metabolites, a kinetic phenomenon termed "phase II metabolism-transport interplay". This interplay is believed to have significant effects on the pharmacokinetics (bioavailability) of drugs/chemicals undergoing phase II metabolism. In this article, we review the studies investigating the phase II metabolism-transport interplay using cell models, perfused rat intestine, and intact rats. The potential confounding factors in exploring such interplay is also summarized. Moreover, the mechanism underlying the phase II metabolism-transport interplay is discussed. Various studies with engineered cells and rodents have demonstrated that there is an interaction (interplay) between phase II enzymes and efflux transporters. This type of interplay mainly refers to the dependence of phase II (conjugative) metabolism on the activities of efflux transporters. In general, inhibiting efflux transporters or decreasing their expression causes the reductions in metabolite excretion, apparent excretion clearance (CLapp) and total metabolism (fmet), as well as an increase in the intracellular level of metabolite (Ci). The deconjugation mediated by hydrolase (acting as a "bridge") is essential for the interplay to play out based on pharmacokinetic modeling/simulations, cell and animal studies. The hydrolases bridge the two processes (i.e., metabolite formation and excretion) and enable the interplay thereof (a bridging effect). Without the bridge, metabolite formation is independent on its downstream process excretion, thus impact of metabolite excretion on its formation is impossible

  10. EBR-II spent fuel treatment demonstration project

    International Nuclear Information System (INIS)

    Benedict, R.W.; Henslee, S.P.

    1997-01-01

    For approximately 10 years, Argonne National Laboratory was developed a fast reactor fuel cycle based on dry processing. When the US fast reactor program was canceled in 1994, the fuel processing technology, called the electrometallurgical technique, was adapted for treating unstable spent nuclear fuel for disposal. While this technique, which involves electrorefining fuel in a molten salt bath, is being developed for several different fuel categories, its initial application is for sodium-bonded metallic spent fuel. In June 1996, the Department of Energy (DOE) approved a radiation demonstration program in which 100 spent driver assemblies and 25 spent blanket assemblies from the Experimental Breeder Reactor-II (EBR-II) will be treated over a three-year period. This demonstrated will provide data that address issues in the National Research Council's evaluation of the technology. The planned operations will neutralize the reactive component (elemental sodium) in the fuel and produce a low enriched uranium product, a ceramic waste and a metal waste. The fission products and transuranium elements, which accumulate in the electrorefining salt, will be stabilized in the glass-bonded ceramic waste form. The stainless steel cladding hulls, noble metal fission products, and insoluble residues from the process will be stabilized in a stainless steel/zirconium alloy. Upon completion of a successful demonstration and additional environmental evaluation, the current plans are to process the remainder of the DOE sodium bonded fuel

  11. Final Report: Phase II Nevada Water Resources Data, Modeling, and Visualization (DMV) Center

    Energy Technology Data Exchange (ETDEWEB)

    Jackman, Thomas [Desert Research Institute; Minor, Timothy [Desert Research Institute; Pohll, Gregory [Desert Research Institute

    2013-07-22

    Water is unquestionably a critical resource throughout the United States. In the semi-arid west -- an area stressed by increase in human population and sprawl of the built environment -- water is the most important limiting resource. Crucially, science must understand factors that affect availability and distribution of water. To sustain growing consumptive demand, science needs to translate understanding into reliable and robust predictions of availability under weather conditions that could be average but might be extreme. These predictions are needed to support current and long-term planning. Similar to the role of weather forecast and climate prediction, water prediction over short and long temporal scales can contribute to resource strategy, governmental policy and municipal infrastructure decisions, which are arguably tied to the natural variability and unnatural change to climate. Change in seasonal and annual temperature, precipitation, snowmelt, and runoff affect the distribution of water over large temporal and spatial scales, which impact the risk of flooding and the groundwater recharge. Anthropogenic influences and impacts increase the complexity and urgency of the challenge. The goal of this project has been to develop a decision support framework of data acquisition, digital modeling, and 3D visualization. This integrated framework consists of tools for compiling, discovering and projecting our understanding of processes that control the availability and distribution of water. The framework is intended to support the analysis of the complex interactions between processes that affect water supply, from controlled availability to either scarcity or deluge. The developed framework enables DRI to promote excellence in water resource management, particularly within the Lake Tahoe basin. In principle, this framework could be replicated for other watersheds throughout the United States. Phase II of this project builds upon the research conducted during

  12. Advanced Start of Combustion Sensor Phases I and II-A: Feasibility Demonstration, Design and Optimization

    Energy Technology Data Exchange (ETDEWEB)

    Chad Smutzer

    2010-01-31

    Homogeneous Compressed Charge Ignition (HCCI) has elevated the need for Start of Combustion (SOC) sensors. HCCI engines have been the exciting focus of engine research recently, primarily because HCCI offers higher thermal efficiency than the conventional Spark Ignition (SI) engines and significantly lower NOx and soot emissions than conventional Compression Ignition (CI) engines, and could be fuel neutral. HCCI has the potential to unify all the internal combustion engine technology to achieve the high-efficiency, low-emission goal. However, these advantages do not come easy. It is well known that the problems encountered with HCCI combustion center on the difficulty of controlling the Start of Combustion. TIAX has an SOC sensor under development which has shown promise. In previous work, including a DOE-sponsored SBIR project, TIAX has developed an accelerometer-based method which was able to determine SOC within a few degrees crank angle for a range of operating conditions. A signal processing protocol allows reconstruction of the combustion pressure event signal imbedded in the background engine vibration recorded by the accelerometer. From this reconstructed pressure trace, an algorithm locates the SOC. This SOC sensor approach is nonintrusive, rugged, and is particularly robust when the pressure event is strong relative to background engine vibration (at medium to high engine load). Phase I of this project refined the previously developed technology with an engine-generic and robust algorithm. The objective of the Phase I research was to answer two fundamental questions: Can the accelerometer-based SOC sensor provide adequate SOC event capture to control an HCCI engine in a feedback loop? And, will the sensor system meet cost, durability, and software efficiency (speed) targets? Based upon the results, the answer to both questions was 'YES'. The objective of Phase II-A was to complete the parameter optimization of the SOC sensor prototype in order

  13. Quantitative imaging studies with PET VI. Project II

    International Nuclear Information System (INIS)

    Copper, M.; Chen, C.T.; Yasillo, N.; Gatley, J.; Ortega, C.; DeJesus, O.; Friedman, A.

    1985-01-01

    This project is focused upon the development of hardware and software to improve PET image analysis and upon clinical applications of PET. In this report the laboratory's progress in various attenuation correction methods for brain imaging are described. The use of time-of-flight information for image reconstruction is evaluated. The location of dopamine D1 and D2 receptors in brain was found to be largely in the basal ganghia. 1 tab. (DT)

  14. Explaining European Emission Allowance Price Dynamics: Evidence from Phase II

    OpenAIRE

    Wilfried Rickels; Dennis Görlich; Gerrit Oberst

    2010-01-01

    In 2005, the European Emission Trading Scheme (EU-ETS) established a new commodity: the right to emit a ton of CO2 (EUA). Since its launch, the corresponding price has shown rather turbulent dynamics, including nervous reactions to policy announcements and a price collapse after a visible over-allocation in Phase I. As a consequence, the question whether fundamental factors (fossil fuel prices, economic activity, weather) affect the EUA price remained partially unresolved. Today, being halfwa...

  15. Draft Environmental Impact Statement: Proposed Tenaska, Washington II Generation Project

    International Nuclear Information System (INIS)

    1993-08-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Power Partners, Inc. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and evaluated in the Environmental Impact Statement (EIS) include: potential air quality impacts such as emissions and their contribution to the ''greenhouse'' effect; potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields, and potential water quality impacts such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is particularly controversial. The EIS is being mailed to numerous agencies, groups, and individuals. There will be a 45-day comment period, during which a Public Hearing will be held

  16. OECD/NEA Sandia Fuel Project phase I: Benchmark of the ignition testing

    Energy Technology Data Exchange (ETDEWEB)

    Adorni, Martina, E-mail: martina_adorni@hotmail.it [UNIPI (Italy); Herranz, Luis E. [CIEMAT (Spain); Hollands, Thorsten [GRS (Germany); Ahn, Kwang-II [KAERI (Korea, Republic of); Bals, Christine [GRS (Germany); D' Auria, Francesco [UNIPI (Italy); Horvath, Gabor L. [NUBIKI (Hungary); Jaeckel, Bernd S. [PSI (Switzerland); Kim, Han-Chul; Lee, Jung-Jae [KINS (Korea, Republic of); Ogino, Masao [JNES (Japan); Techy, Zsolt [NUBIKI (Hungary); Velazquez-Lozad, Alexander; Zigh, Abdelghani [USNRC (United States); Rehacek, Radomir [OECD/NEA (France)

    2016-10-15

    Highlights: • A unique PWR spent fuel pool experimental project is analytically investigated. • Predictability of fuel clad ignition in case of a complete loss of coolant in SFPs is assessed. • Computer codes reasonably estimate peak cladding temperature and time of ignition. - Abstract: The OECD/NEA Sandia Fuel Project provided unique thermal-hydraulic experimental data associated with Spent Fuel Pool (SFP) complete drain down. The study conducted at Sandia National Laboratories (SNL) was successfully completed (July 2009 to February 2013). The accident conditions of interest for the SFP were simulated in a full scale prototypic fashion (electrically heated, prototypic assemblies in a prototypic SFP rack) so that the experimental results closely represent actual fuel assembly responses. A major impetus for this work was to facilitate severe accident code validation and to reduce modeling uncertainties within the codes. Phase I focused on axial heating and burn propagation in a single PWR 17 × 17 assembly (i.e. “hot neighbors” configuration). Phase II addressed axial and radial heating and zirconium fire propagation including effects of fuel rod ballooning in a 1 × 4 assembly configuration (i.e. single, hot center assembly and four, “cooler neighbors”). This paper summarizes the comparative analysis regarding the final destructive ignition test of the phase I of the project. The objective of the benchmark is to evaluate and compare the predictive capabilities of computer codes concerning the ignition testing of PWR fuel assemblies. Nine institutions from eight different countries were involved in the benchmark calculations. The time to ignition and the maximum temperature are adequately captured by the calculations. It is believed that the benchmark constitutes an enlargement of the validation range for the codes to the conditions tested, thus enhancing the code applicability to other fuel assembly designs and configurations. The comparison of

  17. Final waste forms project: Performance criteria for phase I treatability studies

    International Nuclear Information System (INIS)

    Gilliam, T.M.; Hutchins, D.A.; Chodak, P. III

    1994-06-01

    This document defines the product performance criteria to be used in Phase I of the Final Waste Forms Project. In Phase I, treatability studies will be performed to provide open-quotes proof-of-principleclose quotes data to establish the viability of stabilization/solidification (S/S) technologies. This information is required by March 1995. In Phase II, further treatability studies, some at the pilot scale, will be performed to provide sufficient data to allow treatment alternatives identified in Phase I to be more fully developed and evaluated, as well as to reduce performance uncertainties for those methods chosen to treat a specific waste. Three main factors influence the development and selection of an optimum waste form formulation and hence affect selection of performance criteria. These factors are regulatory, process-specific, and site-specific waste form standards or requirements. Clearly, the optimum waste form formulation will require consideration of performance criteria constraints from each of the three categories. Phase I will focus only on the regulatory criteria. These criteria may be considered the minimum criteria for an acceptable waste form. In other words, a S/S technology is considered viable only if it meet applicable regulatory criteria. The criteria to be utilized in the Phase I treatability studies were primarily taken from Environmental Protection Agency regulations addressed in 40 CFR 260 through 265 and 268; and Nuclear Regulatory Commission regulations addressed in 10 CFR 61. Thus the majority of the identified criteria are independent of waste form matrix composition (i.e., applicable to cement, glass, organic binders etc.)

  18. Final waste forms project: Performance criteria for phase I treatability studies

    Energy Technology Data Exchange (ETDEWEB)

    Gilliam, T.M. [Oak Ridge National Lab., TN (United States); Hutchins, D.A. [Martin Marietta Energy Systems, Inc., Oak Ridge, TN (United States); Chodak, P. III [Massachusetts Institute of Technology (United States)

    1994-06-01

    This document defines the product performance criteria to be used in Phase I of the Final Waste Forms Project. In Phase I, treatability studies will be performed to provide {open_quotes}proof-of-principle{close_quotes} data to establish the viability of stabilization/solidification (S/S) technologies. This information is required by March 1995. In Phase II, further treatability studies, some at the pilot scale, will be performed to provide sufficient data to allow treatment alternatives identified in Phase I to be more fully developed and evaluated, as well as to reduce performance uncertainties for those methods chosen to treat a specific waste. Three main factors influence the development and selection of an optimum waste form formulation and hence affect selection of performance criteria. These factors are regulatory, process-specific, and site-specific waste form standards or requirements. Clearly, the optimum waste form formulation will require consideration of performance criteria constraints from each of the three categories. Phase I will focus only on the regulatory criteria. These criteria may be considered the minimum criteria for an acceptable waste form. In other words, a S/S technology is considered viable only if it meet applicable regulatory criteria. The criteria to be utilized in the Phase I treatability studies were primarily taken from Environmental Protection Agency regulations addressed in 40 CFR 260 through 265 and 268; and Nuclear Regulatory Commission regulations addressed in 10 CFR 61. Thus the majority of the identified criteria are independent of waste form matrix composition (i.e., applicable to cement, glass, organic binders etc.).

  19. Advanced Simulation Capability for Environmental Management - Current Status and Phase II Demonstration Results - 13161

    Energy Technology Data Exchange (ETDEWEB)

    Seitz, Roger R.; Flach, Greg [Savannah River National Laboratory, Savannah River Site, Bldg 773-43A, Aiken, SC 29808 (United States); Freshley, Mark D.; Freedman, Vicky; Gorton, Ian [Pacific Northwest National Laboratory, MSIN K9-33, P.O. Box 999, Richland, WA 99352 (United States); Dixon, Paul; Moulton, J. David [Los Alamos National Laboratory, MS B284, P.O. Box 1663, Los Alamos, NM 87544 (United States); Hubbard, Susan S.; Faybishenko, Boris; Steefel, Carl I.; Finsterle, Stefan [Lawrence Berkeley National Laboratory, 1 Cyclotron Road, MS 50B-4230, Berkeley, CA 94720 (United States); Marble, Justin [Department of Energy, 19901 Germantown Road, Germantown, MD 20874-1290 (United States)

    2013-07-01

    The U.S. Department of Energy (US DOE) Office of Environmental Management (EM), Office of Soil and Groundwater, is supporting development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM is a state-of-the-art scientific tool and approach for understanding and predicting contaminant fate and transport in natural and engineered systems. The modular and open source high-performance computing tool facilitates integrated approaches to modeling and site characterization that enable robust and standardized assessments of performance and risk for EM cleanup and closure activities. The ASCEM project continues to make significant progress in development of computer software capabilities with an emphasis on integration of capabilities in FY12. Capability development is occurring for both the Platform and Integrated Tool-sets and High-Performance Computing (HPC) Multi-process Simulator. The Platform capabilities provide the user interface and tools for end-to-end model development, starting with definition of the conceptual model, management of data for model input, model calibration and uncertainty analysis, and processing of model output, including visualization. The HPC capabilities target increased functionality of process model representations, tool-sets for interaction with Platform, and verification and model confidence testing. The Platform and HPC capabilities are being tested and evaluated for EM applications in a set of demonstrations as part of Site Applications Thrust Area activities. The Phase I demonstration focusing on individual capabilities of the initial tool-sets was completed in 2010. The Phase II demonstration completed in 2012 focused on showcasing integrated ASCEM capabilities. For Phase II, the Hanford Site deep vadose zone (BC Cribs) served as an application site for an end-to-end demonstration of capabilities, with emphasis on integration and linkages between the Platform and HPC components. Other demonstrations

  20. Advanced Simulation Capability for Environmental Management - Current Status and Phase II Demonstration Results - 13161

    International Nuclear Information System (INIS)

    Seitz, Roger R.; Flach, Greg; Freshley, Mark D.; Freedman, Vicky; Gorton, Ian; Dixon, Paul; Moulton, J. David; Hubbard, Susan S.; Faybishenko, Boris; Steefel, Carl I.; Finsterle, Stefan; Marble, Justin

    2013-01-01

    The U.S. Department of Energy (US DOE) Office of Environmental Management (EM), Office of Soil and Groundwater, is supporting development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM is a state-of-the-art scientific tool and approach for understanding and predicting contaminant fate and transport in natural and engineered systems. The modular and open source high-performance computing tool facilitates integrated approaches to modeling and site characterization that enable robust and standardized assessments of performance and risk for EM cleanup and closure activities. The ASCEM project continues to make significant progress in development of computer software capabilities with an emphasis on integration of capabilities in FY12. Capability development is occurring for both the Platform and Integrated Tool-sets and High-Performance Computing (HPC) Multi-process Simulator. The Platform capabilities provide the user interface and tools for end-to-end model development, starting with definition of the conceptual model, management of data for model input, model calibration and uncertainty analysis, and processing of model output, including visualization. The HPC capabilities target increased functionality of process model representations, tool-sets for interaction with Platform, and verification and model confidence testing. The Platform and HPC capabilities are being tested and evaluated for EM applications in a set of demonstrations as part of Site Applications Thrust Area activities. The Phase I demonstration focusing on individual capabilities of the initial tool-sets was completed in 2010. The Phase II demonstration completed in 2012 focused on showcasing integrated ASCEM capabilities. For Phase II, the Hanford Site deep vadose zone (BC Cribs) served as an application site for an end-to-end demonstration of capabilities, with emphasis on integration and linkages between the Platform and HPC components. Other demonstrations

  1. European supercritical water cooled reactor (HPLWR Phase 2 project)

    International Nuclear Information System (INIS)

    Schulenberg, Thomas; Starflinger, Joerg; Marsault, Philippe; Bittermann, Dietmar; Maraczy, Czaba; Laurien, Eckart; Lycklama, Jan Aiso; Anglart, Henryk; Andreani, Michele; Ruzickova, Mariana; Heikinheimo, Liisa

    2010-01-01

    The High Performance Light Water Reactor (HPLWR), how the European Supercritical Water Cooled Reactor is called, is a pressure vessel type reactor operated with supercritical water at 25 MPa feedwater pressure and 500 deg C maximum core outlet temperature. It is designed and analyzed by a European consortium of 13 partners from 8 Euratom member states in the second phase of the HPLWR project. Most emphasis has been laid on a core with a thermal neutron spectrum, consisting of small, housed fuel assemblies with 40 fuel pins each and a central water box to improve the neutron moderation despite the low coolant density. Peak cladding temperatures of the fuel rods have been minimized by heating up the coolant in three steps with intermediate coolant mixing. The innovative core design with upward and downward flow through its assemblies has been studied with neutronic, thermal-hydraulic and stress analyses and has been reviewed carefully in a mid-term assessment. The containment design with its safety and residual heat removal systems is based on the latest boiling water reactor concept, but with different passive high pressure coolant injection systems to cause a forced convection through the core. The design concept of the steam cycle is indicating the envisaged efficiency increase to around 44%. Moreover, it provides the constraints to design the components of the balance of the plant. The project is accompanied by numerical studies of heat transfer of supercritical water in fuel assemblies and by material tests of candidate cladding alloys, performed by the consortium and supported by additional tests of the Joint Research Centre of the European Commission. An overview of results achieved up to now, given in this paper, is illustrating the latest scientific and technological advances. (author)

  2. Introducing the Objectives, Procedures and Structure of Lifestyle Promotion Project (LPP: Phase I

    Directory of Open Access Journals (Sweden)

    Jafar Sadegh Tabrizi

    2016-09-01

    Full Text Available The Life style promotion project (LPP is a long term community-based project for prevention and control of non-communicable diseases (NCDs. The design consisted of two stages; phase I was a cross-sectional prevalence study of NCDs and the associ¬ated risk factors. Phase II is a prospective follow-up study in which data recollection will be performed every 2 years after the intervention initiated. In this study, 1,500 households residing in Tabriz, Marand, Bonab, Oskoo, Varzeghan, Khodafrin (150 clusters of 10 households cities which in terms of socio-economic variables, distance from the center, population and access to medical facilities are in the same category of other cities of province will be examined. A total of 3000 patients (15-65 years living in East Azerbaijan province will be randomly enrolled. After obtaining informed consent from all participants, weight, height, waist circumference, hip circumference and blood pressure will be measured with standard tools. Fasting blood sugar, total cholesterol, LDL-C, HDL-C, TG, serum vitamin D, ALT, AST, Hb and serum ferritin will be assessed. The questionnaires related to socioeconomic status, dietary intake, physical activity, angina (Rose, asthma, anxiety, smoking, food security and safety will be completed. Necessary data in other variables such as age, gender, menopausal status, medical history and medication use will be collected using questionnaires. The results of this study can be used in formulating long term health programs for the prevention of non-communicable diseases.

  3. Carbon footprint estimator, phase II : volume I - GASCAP model & volume II - technical appendices [technical brief].

    Science.gov (United States)

    2014-03-01

    This study resulted in the development of the GASCAP model (the Greenhouse Gas Assessment : Spreadsheet for Transportation Capital Projects). This spreadsheet model provides a user-friendly interface for determining the greenhouse gas (GHG) emissions...

  4. Comparing two tetraalkylammonium ionic liquids. II. Phase transitions

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Thamires A.; Paschoal, Vitor H.; Faria, Luiz F. O.; Ribeiro, Mauro C. C., E-mail: mccribei@iq.usp.br [Laboratório de Espectroscopia Molecular, Departamento de Química Fundamental, Instituto de Química, Universidade de São Paulo, CP 26077, CEP 05513-970 São Paulo, SP (Brazil); Ferreira, Fabio F.; Costa, Fanny N. [Centro de Ciências Naturais e Humanas, Universidade Federal do ABC, Santo André, SP (Brazil); Giles, Carlos [Depto. de Física da Matéria Condensada, Instituto de Física Gleb Wataghin, Universidade Estadual de Campinas, 13083-859 Campinas, SP (Brazil)

    2016-06-14

    Phase transitions of the ionic liquids n-butyl-trimethylammonium bis(trifluoromethanesulfonyl)imide, [N{sub 1114}][NTf{sub 2}], and methyl-tributylammonium bis(trifluoromethanesulfonyl)imide, [N{sub 1444}][NTf{sub 2}], were investigated by differential scanning calorimetry (DSC), X-ray diffraction (XRD) measurements, and Raman spectroscopy. XRD and Raman spectra were obtained as a function of temperature at atmospheric pressure, and also under high pressure at room temperature using a diamond anvil cell (DAC). [N{sub 1444}][NTf{sub 2}] experiences glass transition at low temperature, whereas [N{sub 1114}][NTf{sub 2}] crystallizes or not depending on the cooling rate. Both the ionic liquids exhibit glass transition under high pressure. XRD and low-frequency Raman spectra provide a consistent physical picture of structural ordering-disordering accompanying the thermal events of crystallization, glass transition, cold crystallization, pre-melting, and melting. Raman spectra in the high-frequency range of some specific cation and anion normal modes reveal conformational changes of the molecular structures along phase transitions.

  5. Dead layer and active volume determination for GERDA Phase II detectors

    Energy Technology Data Exchange (ETDEWEB)

    Lehnert, Bjoern [TU Dresden (Germany); Collaboration: GERDA-Collaboration

    2013-07-01

    The GERDA experiment investigates the neutrinoless double beta decay of {sup 76}Ge and is currently running Phase I of its physics program. Using the same isotope as the Heidelberg Moscow (HDM) experiment, GERDA aims to directly test the claim of observation by a subset of the HDM collaboration. For the update to Phase II of the experiment in 2013, the collaboration organized the production of 30 new Broad Energy Germanium (BEGe) type detectors from original 35 kg enriched material and tested their performance in the low background laboratory HADES in SCK.CEN, Belgium. With additional 20 kg of detectors, GERDA aims to probe the degenerated hierarchy scenario. One of the crucial detector parameters is the active volume (AV) fraction which directly enters into all physics analysis. This talk presents the methodology of dead layer and AV determination with different calibration sources such as {sup 241}Am, {sup 133}Ba, {sup 60}Co and {sup 228}Th and the results obtained for the new Phase II detectors. Furthermore, the AV fraction turned out to be the largest systematic uncertainty in the analysis of Phase I data which makes it imperative to reduce its uncertainty for Phase II. This talk addresses the major contributions to the AV uncertainty and gives an outlook for improvements in Phase II analysis.

  6. Phase unwrapping algorithm based on multi-frequency fringe projection and fringe background for fringe projection profilometry

    International Nuclear Information System (INIS)

    Zhang, Chunwei; Zhao, Hong; Gu, Feifei; Ma, Yueyang

    2015-01-01

    A phase unwrapping algorithm specially designed for the phase-shifting fringe projection profilometry (FPP) is proposed. It combines a revised dual-frequency fringe projectionalgorithm and a proposed fringe background based quality guided phase unwrapping algorithm (FB-QGPUA). Phase demodulated from the high-frequency fringe patterns is partially unwrapped by that demodulated from the low-frequency ones. Then FB-QGPUA is adopted to further unwrap the partially unwrapped phase. Influences of the phase error on the measurement are researched. Strategy to select the fringe pitch is given. Experiments demonstrate that the proposed method is very robust and efficient. (paper)

  7. 2-Phase NSGA II: An Optimized Reward and Risk Measurements Algorithm in Portfolio Optimization

    Directory of Open Access Journals (Sweden)

    Seyedeh Elham Eftekharian

    2017-11-01

    Full Text Available Portfolio optimization is a serious challenge for financial engineering and has pulled down special attention among investors. It has two objectives: to maximize the reward that is calculated by expected return and to minimize the risk. Variance has been considered as a risk measure. There are many constraints in the world that ultimately lead to a non–convex search space such as cardinality constraint. In conclusion, parametric quadratic programming could not be applied and it seems essential to apply multi-objective evolutionary algorithm (MOEA. In this paper, a new efficient multi-objective portfolio optimization algorithm called 2-phase NSGA II algorithm is developed and the results of this algorithm are compared with the NSGA II algorithm. It was found that 2-phase NSGA II significantly outperformed NSGA II algorithm.

  8. Coal-fired MHD combustor development project: Phase 3D

    Science.gov (United States)

    1985-05-01

    This fourth quarterly technical progress report of the Coal-Fired MHD Combustor Development Project (Phase 3D) presents the accomplishments during the period February 1 to April 30, 1985. The scope of work covered by this quarterly report encompasses development work on the 50 MW/sub t/ combustor related to test support at the CDIF, assembly and checkout of first and second stage hardware, second stage design verification testing, designs for a continuous slag rejector and low preheat inlet section, and planning for power train testing. Progress includes the following: assembly and checkout of the second first stage, two second stages, and PEM was completed and the hardware was shipped to CDIF and FETS; integration of first and second stage hardware on the FETS Cell No. 2 test stand was completed, cold flow functional tests were performed, and hot fire checkout testing was initiated; assembly of the continuous slag rejector test set-up was 70% completed; the low preheat air inlet section Preliminary Design Review was held (work on the detail design was initiated and is 85% complete); and the Users' Manual was updated to include material for the second stage and final revisions to the power train test plan were made.

  9. The National Geographic Names Data Base: Phase II instructions

    Science.gov (United States)

    Orth, Donald J.; Payne, Roger L.

    1987-01-01

    The Geographic Names Information System is a computer-based information system developed to meet major national needs by providing information for named entities in the United States, its territories, and outlying areas. The National Geographic Names Data Base, a component of the Geographic Names Information System, currently contains most names and associated information recorded on the 1:24,000-scale (or largest scale available) topographic maps of the U.S. Geological Survey. The work involved in this initial compilation of names shown on the topographic-map series, and the development and editing of the National Geographic Names Data Base, is referred to as Phase I. Optimal use and effectiveness of an automated names system require that the names of features

  10. Phase II evaluation of waste concrete road materials for use in oyster aquaculture - field test.

    Science.gov (United States)

    2015-02-01

    The overall objective of this study was to determine the suitability of recycled concrete aggregate : (RCA) from road projects as bottom conditioning material for on-bottom oyster aquaculture in the : Chesapeake Bay. During this Phase of the study, t...

  11. Software Infrastructure to Enable Modeling & Simulation as a Service (M&SaaS), Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — This SBIR Phase 2 project will produce a software service infrastructure that enables most modeling and simulation (M&S) activities from code development and...

  12. Innovative Structural and Material Concepts for Low-Weight Low-Drag Aircraft Design, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — The overall technical objective of this multi-phase project is to develop and validate a so-called 'AAW-Process' that consists of (i) the Active Aeroelastic Wing...

  13. High Power Compact Single-Frequency Volume Bragg Er-Doped Fiber Laser, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — This proposal is based on successful results of Phase I project where it was shown that the use of volume Bragg gratings in PTR glass as selectors of transverse and...

  14. Time Domain Terahertz Axial Computed Tomography Non Destructive Evaluation, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — In this Phase 2 project, we propose to develop, construct, and deliver to NASA a computed axial tomography time-domain terahertz (CT TD-THz) non destructive...

  15. Phase II evaluation of waste concrete road materials for use in oyster aquaculture - field test.

    Science.gov (United States)

    2014-11-01

    The overall objective of this study was to determine the suitability of recycled concrete : aggregate (RCA) from road projects as bottom conditioning material for on-bottom oyster : aquaculture in the Chesapeake Bay. During this Phase of the study, t...

  16. Integrated Computational System for Electrochemical Device Design and Simulation, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — During the Phase I project, major portions of a base, open-source, easily extensible battery modeling system have been developed with a modern, modular architecture...

  17. Model Orlando regionally efficient travel management coordination center (MORE TMCC), phase II : final report.

    Science.gov (United States)

    2012-09-01

    The final report for the Model Orlando Regionally Efficient Travel Management Coordination Center (MORE TMCC) presents the details of : the 2-year process of the partial deployment of the original MORE TMCC design created in Phase I of this project...

  18. Summary report of Japan-US joint project. JUPITER-II. FuY 2001 - 2006

    International Nuclear Information System (INIS)

    Abe, K.; Kohyama, A.; Tanaka, S.; Muroga, T.; Namba, C.; Sze, D.K.

    2008-03-01

    This report summarizes the scientific accomplishments achieved through the JUPITER-II Japan-US Collaboration Program. The JUPITER-II collaboration (Japan-USA Program of Irradiation/Integration Test for Fusion Research -II) has been carried out through six years (2001-2006) under Phase 4 of the collaboration implemented by Amendment 4 of Annex I to the MEXT (Ministry of Education, Culture, Sports, Science and Technology)-DOE (United States Department of Energy) Cooperation. This program followed the RTNS-II Program (Phase 1: 1982-1986), the FFTF/MOTA Program (Phase 2: 1987-1994) and the JUPITER Program (Phase 3: 1995-2000). The JUPITER-II collaboration was established to provide the scientific foundations for understanding the integrated behavior of blanket materials combinations operating under conditions characteristic of fusion reactors, including interactive neutron irradiation effects, high temperature coolant flow phenomena, heat and mass transport in blanket materials, and coolant chemistry and its interactions with surrounding materials. The scientific concept of this program is to study the key technology in macroscopic system integration for advanced blanket based on an understanding of the relevant mechanics at the microscopic level. The 44 of the presented papers are indexed individually. (J.P.N.)

  19. Plasma resistance behavior during the linear decay phase of RFPs in ETA BETA II

    International Nuclear Information System (INIS)

    Nalesso, G.F.

    1982-01-01

    In the aided-reversal mode RFP discharges produced in ETA BETA II, the plasma current is characterized by a linear decay phase, which follows an approximately exponential phase. During the same period the measured toroidal voltage is negative and initially increasing in absolute value (exponential phase) and then decreasing to almost zero during the linear phase before the current termination. The same behavior of the current has been observed in the quiescent phase in Zeta where a negative toroidal electric field was also observed. In this note we present a model that can explain the linear decay phase and fits with the experimental parameters and allows us to estimate the plasma resistance behavior during the linear phase of slow reversed field pinch discharges

  20. Spatially Defined Oligonucleotide Arrays. Technical Report for Phase II; FINAL

    International Nuclear Information System (INIS)

    None

    2000-01-01

    The goal of the Human Genome Project is to sequence all 3 billion base pairs of the human genome. Progress in this has been rapid; GenBank(reg s ign) finished 1994 with 286 million bases of sequence and grew by 2470 in the first quarter of 1995. The challenge to the scientific community is to understand the biological relevance of this genetic information. In most cases the sequence being generated for any single region of the genome represents the genotype of a single individual. A complete understanding of the function of specific genes and other regions of the genome and their role in human disease and development will only become apparent when the sequence of many more individuals is known. Access to genetic information is ultimately limited by the ability to screen DNA sequence. Although the pioneering sequencing methods of Sanger et al. (15) and Maxam and Gilbert (11) have become standard in virtually all molecular biology laboratories, the basic protocols remain largely unchanged. The throughput of this sequencing technology is now becoming the rate-limiting step in both large-scale sequencing projects such as the Human Genome Project and the subsequent efforts to understand genetic diversity. This has inspired the development of advanced DNA sequencing technologies (9), Incremental improvements to Sanger sequencing have been made in DNA labeling and detection. High-speed electrophoresis methods using ultrathin gels or capillary arrays are now being more widely employed. However, these methods are throughput-limited by their sequential nature and the speed and resolution of separations. This limitation will become more pronounced as the need to rapidly screen newly discovered genes for biologically relevant polymorphisms increases. An alternative to gel-based sequencing is to use high-density oligonucleotide probe arrays. Oligonucleotide probe arrays display specific oligonucleotide probes at precise locations in a high density, information-rich format (5