WorldWideScience

Sample records for project officer ronald

  1. 34 CFR 647.1 - What is the Ronald E. McNair Postbaccalaureate Achievement Program?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What is the Ronald E. McNair Postbaccalaureate... (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION RONALD E. MCNAIR POSTBACCALAUREATE ACHIEVEMENT PROGRAM General § 647.1 What is the Ronald E. McNair Postbaccalaureate Achievement Program? The...

  2. Ronald Reagan's "New Federalism."

    Science.gov (United States)

    Parker, Joseph B.

    1982-01-01

    Describes how changes in federal fiscal policies affect the federal government's relationship to state and local government. Franklin D. Roosevelt's and Ronald Reagan's formulas for "New Federalism" are compared. (AM)

  3. DSN Aperture Enhancement Project Office

    Science.gov (United States)

    Marina, Miguel

    2012-01-01

    All contracts are underway for antennas, associated facilities modifications and new transmitters. High risk CPI 100kW klystron and JPL high power uplink microwave components have been designed, prototyped and successfully tested at GDSCC to support the 80kW transmitter implementation and testing at vendor facility. Open issues, which might affect project delivery date, have plans in place or are being created, to maintain DSS-35 Operational Date. There are no known open issues that affect performance. Overall good progress has been made in all areas (procurements, contracts, design and development) and the project is confident that DSS-35 & 36 antennas and the three 80kW Uplink systems will be delivered according to plan.

  4. Ronald Reagan's Civil Religion.

    Science.gov (United States)

    Fulmer, Hal W.

    Ronald Reagan's rhetorical presidency can be summarized as a leader attempting, at virtually every occasion, to stem the dissolution of the American spirit by celebrating the country's mythic past. Such attempts were Reagan's celebration of nationalism through a particular discussion of the interrelationships between liberty, freedom, democracy,…

  5. Astronaut Ronald Sega in crew cabin

    Science.gov (United States)

    1994-01-01

    Astronaut Ronald M. Sega suspends himself in the weightlessness aboard the Space Shuttle Discovery's crew cabin, as the Remote Manipulator System (RMS) arm holds the Wake Shield Facility (WSF) aloft. The mission specialist is co-principle investigator on the the WSF project. Note the University of Colorado, Colorado Springs banner above his head.

  6. [Earth Science Technology Office's Computational Technologies Project

    Science.gov (United States)

    Fischer, James (Technical Monitor); Merkey, Phillip

    2005-01-01

    This grant supported the effort to characterize the problem domain of the Earth Science Technology Office's Computational Technologies Project, to engage the Beowulf Cluster Computing Community as well as the High Performance Computing Research Community so that we can predict the applicability of said technologies to the scientific community represented by the CT project and formulate long term strategies to provide the computational resources necessary to attain the anticipated scientific objectives of the CT project. Specifically, the goal of the evaluation effort is to use the information gathered over the course of the Round-3 investigations to quantify the trends in scientific expectations, the algorithmic requirements and capabilities of high-performance computers to satisfy this anticipated need.

  7. National Unmanned Aircraft Systems Project Office

    Science.gov (United States)

    Goplen, Susan E.; Sloan, Jeff L.

    2015-01-01

    The U.S. Geological Survey (USGS) National Unmanned Aircraft Systems (UAS) Project Office leads the implementation of UAS technology in the Department of the Interior (DOI). Our mission is to support the transition of UAS into DOI as a new cost-effective tool for collecting remote-sensing data to monitor environmental conditions, respond to natural hazards, recognize the consequences and benefits of land and climate change and conduct wildlife inventories. The USGS is teaming with all DOI agencies and academia as well as local, State, and Tribal governments with guidance from the Federal Aviation Administration and the DOI Office of Aviation Services (OAS) to lead the safe, efficient, costeffective and leading-edge adoption of UAS technology into the scientific research and operational activities of the DOI.

  8. A comparison of project participants and extension officers ...

    African Journals Online (AJOL)

    The study examined the perception of project participants and extension officers regarding marketing of agricultural produce in agricultural projects in the North West Province. The objective of the study was primarily to compare the perceptions of project participants and extension officers. When establishing a project, ...

  9. 48 CFR 2052.215-71 - Project officer authority.

    Science.gov (United States)

    2010-10-01

    ... directive whatever. (d) All technical directions must be issued in writing by the project officer or must be... advise the contractor in writing that, in the contracting officer's opinion, the technical direction is... subject to the technical direction of the NRC project officer. The term technical direction is defined to...

  10. Leadership Behaviors In Project Design Offices

    OpenAIRE

    Kasapoğlu, Esin

    2011-01-01

    Leadership may be defined as the ability to collect a group of people around definite objectives and the achievement of said objectives. An architectural design team needs a leader, and in this paper, the owner of the office is the formal leader. Leadership behaviors of employer architects are directly related to the performance of the design team; therefore, effective leadership is key to a successful design process. Data were collected through a questionnaire on leadership behaviors that wa...

  11. Ronald Reagan and the Russians.

    Science.gov (United States)

    Graebner, Norman A.

    1990-01-01

    Traces U.S.-USSR relations throughout Ronald Reagan's administration. Analyzes the shifts in Reagan's policies toward the Soviet Union. Examines the reasons why Reagan changed his views on the Soviet Union, and discusses the political Right's response to Reagan's changed position. (RW)

  12. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Science.gov (United States)

    2010-10-01

    ... designation of a Program/Project Manager as the Contracting Officer's Technical Representative. 301.607-78... Contracting Officer designation of a Program/Project Manager as the Contracting Officer's Technical... acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  13. Ronald Breslow (1931-2017).

    Science.gov (United States)

    Schepartz, Alanna; Bergman, Robert; Grubbs, Robert H

    2018-01-02

    Ronald Breslow, Samuel Latham Mitchill Professor of Chemistry at Columbia University, passed away on October 25, 2017, at the age of 86. Breslow made remarkable contributions to the fields of physical-organic and bioorganic chemistry, including biological and biomimetic transformations, and the use of molecular recognition to control reaction selectivity. © 2018 Wiley-VCH Verlag GmbH & Co. KGaA, Weinheim.

  14. Ronald Fisher, otec biostatistiky

    Czech Academy of Sciences Publication Activity Database

    Kalina, Jan

    2012-01-01

    Roč. 57, č. 3 (2012), s. 186-190 ISSN 0032-2423 R&D Projects: GA MŠk(CZ) 1M06014 Institutional support: RVO:67985807 Keywords : dějiny matematiky * dějiny genetiky * Hardyovo-Weinbergovo ekvilibrium * klasifikační analýza Subject RIV: AB - History http://dml.cz/handle/10338.dmlcz/143200

  15. European indoor air quality audit project in 56 office buildings

    NARCIS (Netherlands)

    Bluyssen, P.M.; Oliveira Fernandes, E. de; Groes, L.; Clausen, G.H.; Fanger, F.O.; Valbjorn, O.; Bernhard, C.A.; Roulet, C.A.

    1996-01-01

    A European project started at the end of 1992, in which, in addition to current methods, trained sensory panels were used to investigate office buildings all over Europe. The main aim of this EC-Audit was to develop assessment procedures and guid-ance on ventilation and source control, to help

  16. Environmental Audit of the Grand Junction Projects Office

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-01

    The Grand Junction Projects Office (GJPO) is located in Mesa County, Colorado, immediately south and west of the Grand Junction city limits. The US Atomic Energy Commission (AEC) established the Colorado Raw Materials Office at the present-day Grand Junction Projects Office in 1947, to aid in the development of a viable domestic uranium industry. Activities at the site included sampling uranium concentrate; pilot-plant milling research, including testing and processing of uranium ores; and operation of a uranium mill pilot plant from 1954 to 1958. The last shipment of uranium concentrate was sent from GJPO in January, 1975. Since that time the site has been utilized to support various DOE programs, such as the former National Uranium Resource Evaluation (NURE) Program, the Uranium Mill Tailings Remedial Action Project (UMTRAP), the Surplus Facilities Management Program (SFMP), and the Technical Measurements Center (TMC). All known contamination at GJPO is believed to be the result of the past uranium milling, analyses, and storage activities. Hazards associated with the wastes impounded at GJPO include surface and ground-water contamination and potential radon and gamma-radiation exposure. This report documents the results of the Baseline Environmental Audit conducted at Grand Junction Projects Office (GJPO) located in Grand Junction, Colorado. The Grand Junction Baseline Environmental Audit was conducted from May 28 to June 12, 1991, by the Office of Environmental Audit (EH-24). This Audit evaluated environmental programs and activities at GJPO, as well as GJPO activities at the State-Owned Temporary Repository. 4 figs., 12 tabs.

  17. Environmental Audit of the Grand Junction Projects Office

    International Nuclear Information System (INIS)

    1991-08-01

    The Grand Junction Projects Office (GJPO) is located in Mesa County, Colorado, immediately south and west of the Grand Junction city limits. The US Atomic Energy Commission (AEC) established the Colorado Raw Materials Office at the present-day Grand Junction Projects Office in 1947, to aid in the development of a viable domestic uranium industry. Activities at the site included sampling uranium concentrate; pilot-plant milling research, including testing and processing of uranium ores; and operation of a uranium mill pilot plant from 1954 to 1958. The last shipment of uranium concentrate was sent from GJPO in January, 1975. Since that time the site has been utilized to support various DOE programs, such as the former National Uranium Resource Evaluation (NURE) Program, the Uranium Mill Tailings Remedial Action Project (UMTRAP), the Surplus Facilities Management Program (SFMP), and the Technical Measurements Center (TMC). All known contamination at GJPO is believed to be the result of the past uranium milling, analyses, and storage activities. Hazards associated with the wastes impounded at GJPO include surface and ground-water contamination and potential radon and gamma-radiation exposure. This report documents the results of the Baseline Environmental Audit conducted at Grand Junction Projects Office (GJPO) located in Grand Junction, Colorado. The Grand Junction Baseline Environmental Audit was conducted from May 28 to June 12, 1991, by the Office of Environmental Audit (EH-24). This Audit evaluated environmental programs and activities at GJPO, as well as GJPO activities at the State-Owned Temporary Repository. 4 figs., 12 tabs

  18. DOE Contribution to the 2015 US CLIVAR Project Office Budget

    Energy Technology Data Exchange (ETDEWEB)

    DeWeaver, Eric [National Science Foundation (NSF), Washington, DC (United States); Patterson, Michael [US CLIVAR Project Office (USCPO),Washington DC (United States)

    2017-05-10

    The primary goal of the US Climate Variability and Predictability (CLIVAR) Project Office is to enable science community planning and implementation of research to understand and predict climate variability and change on intraseasonal-to-centennial timescales, through observations and modeling with emphasis on the role of the ocean and its interaction with other elements of the Earth system, and to serve the climate community and society through the coordination and facilitation of research on outstanding climate questions.

  19. UMTRA Project Office quality assurance program plan. Revision 6

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites. The UMTRA Project's mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the UMTRA Project Office and its contractors

  20. Office of River Protection: Simplifying Project management tools

    International Nuclear Information System (INIS)

    TAYLOR, D.G.

    2000-01-01

    The primary approach to the effort was to form a multi-organizational team comprised of federal and contractor staff to develop and implement the necessary tools and systems to manage the project. In late 1999 the DOE Manager of the Office of River Protection formed the Project Integration Office to achieve the objective of managing the efforts as a single project. The first major task, and the foundation upon which to base the development of all other tools, was the establishment of a single baseline of activities. However, defining a single scope schedule and cost was a difficult matter indeed. Work scopes were available throughout the project, but the level of detail and the integration of the activities existed primarily between working groups and individuals and not on a project-wide basis. This creates a situation where technical needs, logic flaws, resource balancing, and other similar integration needs are not elevated for management attention and resolution. It should be noted that probably 90% of the interface issues were known and being addressed. The key is simplifying the process and providing tangible assurance that the other 10% does not contain issues that can delay the project. Fortunately all of the contractors employed a common scheduling tool, which served as the basis for first communicating and then integrating baseline activities. Utilizing a powerful computer-based scheduling tool, it was soon possible to integrate the various schedules after the following was accomplished: Establishment of a scheduling specification (standardized input, coding, and approach to logic); and Clearly defined project assumptions

  1. Project Manager Performance and the Decision to Backsource the Project Management Office

    Science.gov (United States)

    Lively, William R.

    2014-01-01

    This paper reviews a management decision of an Information Technology Outsource (ITO) provider to backshore the management oversight of its Project Management Office (PMO) after only one year of offshore operations. Governance is a term used in project management to refer to management oversight. The review is a quantitative analysis of existing…

  2. Official portrait of astronaut Ronald J. Grabe

    Science.gov (United States)

    1989-01-01

    Official portrait of Ronald J. Grabe, United States Air Force (USAF) Colonel, member of Astronaut Class 9 (1980), and space shuttle pilot. Grabe wears launch and entry suit (LES) with helmet displayed on table at his left.

  3. Ronald Fricke - Clean Water Act Public Notice

    Science.gov (United States)

    The EPA is providing notice of a proposed Administrative Penalty Assessment against Ronald Fricke, regarding alleged violations at the concentrated animal feeding operation, located at 22757 170th Street, Carroll, Carroll County, Iowa 51401.

  4. Obituary: Ronald A. Parise, 1951-2008

    Science.gov (United States)

    Gull, Theodore R.

    2009-01-01

    IUE hardcopy facility. By 1981 he joined a team of engineers and scientists beginning the development of the newly selected the Ultraviolet Imaging Telescope (UIT), selected by NASA to fly on board the space shuttles as an attached Spacelab experiment. The UIT project, headed by Ted Stecher as Principal Investigator, was one of three ultraviolet experimental telescopes selected to fly together as an Office of Space Sciences [OSS] payload. Initial plans were for multiple flights with emphasis of observing Halley's Comet in three missions from November 1985 to summer 1986. Ron's responsibilities involved flight hardware and software development, electronic system design, and mission planning activities for UIT. His proficiency led to his selection by the Principal Investigators of the three instruments as a Payload Specialist candidate and acceptance by NASA as one of three payload specialists in support of the series of missions. He, Samuel Durrance, and Kenneth Nordsieck shouldered the responsibilities of training as payload specialists for the instruments integrated on a common pointer, the Spacelab Instrument Pointing System, IPS. As a team they represented the operational needs of the instrument teams and trained to fly with the shuttle team. Preparations moved forward to the March 1986 launch date of Astro-1 to observe Comet Halley and well over a hundred astronomical sources. Unfortunately, the Challenger accident occurred 28 January 1986, thirty-five days before the intended launch date of Astro-1. Ron and Sam, as prime Payload Specialists, and Ken as backup/ ground communicator, took the delay well, staying focused on training to ensure that Astro-1, delayed until December 1990, would be an outstanding success. With at least thirteen launch delays, and on-orbit operational problems, they, the professional astronaut crew, the science teams, and the multitude of engineers and mission support staff managed to accomplish a very successful astronomy mission. Even

  5. Ronald N. Bracewell: An Appreciation

    Science.gov (United States)

    Thompson, A. Richard; Frater, Robert H.

    2010-11-01

    Ronald Newbold Bracewell (1921-2007) made fundamental contributions to the development of radio astronomy in the areas of interferometry, signal processing, and imaging, and also to tomography, various areas of data analysis, and the understanding of Fourier transforms. He was born in Sydney, Australia, and received a B.Sc. degree in mathematics and physics, and B.E. and M.E. degrees in electrical engineering from the University of Sydney, and his Ph.D. from the University of Cambridge, U.K., for research on the ionosphere. In 1949 he joined the Radiophysics Laboratory of CSIRO, where he became interested in radio astronomy. In 1955 he moved to Stanford University, California, where he became Lewis M. Terman Professor of Electrical Engineering. He retired from teaching in 1991, but continued to be active in radio astronomy and other applications of imaging techniques, etc. During his career he published ten books and more than 250 papers. Honors that he received include the Duddell Premium of the Institute of Electrical Engineers, London, the Hertz Medal of the IEEE, and the Order of Australia. For his work on imaging in tomography he was elected to Associate Membership of the Institute of Medicine of the U.S. National Academy of Sciences.

  6. Office of Crystalline Repository Development FY 83 technical project plan

    International Nuclear Information System (INIS)

    1983-03-01

    The technical plan for FY 83 activities of the Office of Crystalline Repository Development is presented in detail. Crystalline Rock Project objectives are discussed in relation to the National Waste Terminal storage (NWTS) program. The plan is in full compliance with requirements mandated by the Nuclear Waste Policy Act of 1982. Implementation will comply with the requirements and criteria set forth in the Nuclear Regulatory Commission regulations (10 CFR 60) and the Environmental Protection Agency standard (40 CFR 191). Technical approaches and the related milestones and schedules are presented for each of the Level 3 NWTS work Breakdown Structure Tasks. These are: Systems, Waste Package, Site, Repository, Regulatory and Institutional, Test Facilities and Excavations, Land Acquisition, and Program Management

  7. Appendix VI: KHNP staffing plan of construction site office: ULCHIN 5 and 6 construction project (ROK)

    International Nuclear Information System (INIS)

    2008-01-01

    KHNP, as an owner/operator organization, is responsible for all project activities including design, procurement, construction, and commissioning, for Korea's nuclear power plant (NPP) construction projects. Four separate functional offices of KHNP are set up to complete the construction management work. These offices are (1) home office, (2) field construction office, (3) field quality assurance office, and (4) field startup/commissioning office. This paper presents a staffing plan for the field construction office starting initial project implementation to final turnover to operations stages. It is recognized that the plan may not be applicable to other utility situations in terms of project management of site activity depending upon how the overall project contract is structured

  8. Obituary: Ronald N. Bracewell, 1921-2007

    Science.gov (United States)

    Petrosian, Vahé

    2009-01-01

    Ronald N. Bracewell, Professor Emeritus (since 1991) of Electrical Engineering at Stanford University, and a true renaissance man of science, died of a heart attack on 12 August 2007 at his home. Ron Bracewell was born in Sydney, Australia, on 22 July 1921, one of the two sons of Cecil and Valerie Bracewell. He graduated from the University of Sydney in 1941 and received his doctorate degree in physics from Cambridge University in 1949. During World War II, Ron worked in the Australian National Radar Establishment, where he designed and developed microwave radar equipment. Like several other World War II radar scientists, after the war he used this experience to pioneer the new field of radio astronomy. With J. L. Pawsey, in 1955 he published the first comprehensive textbook in this field entitled, Radio Astronomy. Bracewell joined the Stanford Electrical Engineering faculty in 1955, and from 1974 on he held the first prestigious Lewis Terman professorship. He was awarded the Outstanding Service Award of the department in 1984. In 1988, he was named an officer of the Order of Australia--the Australian equivalent of Order of the British Empire. Soon after his arrival at Stanford, Bracewell designed and began building a solar spectroheliograph, consisting of thirty-two dish antennas in the form of a cross. This was completed in 1961 and provided daily maps of the Sun for more than a decade encompassing more than one solar activity cycle of eleven years. These maps were useful in predicting magnetic storms caused by solar activity and were used by NASA during the first landing on the Moon. In 1971 he started the building of a five-element radio interferometer, for observation of extragalactic radio sources, with the novel design of unequal spacing that gave the resolution of a ten-element array. Both telescopes are now dismantled. The common characteristics of these and other projects were that they were all built in-house with a limited budget, often a small fraction

  9. Using the project management office to connect the dots between projects and strategy.

    Science.gov (United States)

    Phan, Jacqueline

    2015-03-01

    Project management is recognized as an essential skill required for healthcare leadership and as a result, Project Management Offices (PMOs) in healthcare organizations have become commonplace. When PMOs are well suited and fit to their organization, they are being valued for their ability to support appropriate trade-offs between investments, capacity, and quality. This article provides an overview of healthcare PMOs and advocates for elevating the role of the healthcare PMO from a monitoring and reporting function to a leader and the engine for strategic change within an organization. © 2015 The Canadian College of Health Leaders.

  10. Low Emissions Alternative Power (LEAP) Project Office Business Team of the Aeropropulsion Research Program Office (ARPO) Org. 0140

    Science.gov (United States)

    Buttler, Jennifer A.

    2004-01-01

    The program for which I am working at this summer is Propulsion and Power/Low Emissions Alternative Power (P&P/LEAP). It invests in a fundamental TRL 1-6 research and technology portfolio that will enable the future of: Alternative fuels and/or alternative propulsion systems, non-combustion (electric) propulsion systems. P&P/LEAP will identify and capitalize on the highest potential concepts generated both internal and external to the Agency. During my 2004 summer at NASA Glenn Research Center, I worked with my mentor Barbara Mader, in the Project Office with the Business Team completing various tasks for the project and personnel. The LEAP project is a highly matrixed organization. The Project Office is responsible for the goals advocacy and dollar (budget) of the LEAP project. The objectives of the LEAP Project are to discover new energy sources and develop unconventional engines and power systems directed towards greatly reduced emissions, enable new vehicle concepts for public mobility, new science missions and national security. The Propulsion and PowerLow Emissions Alternative Power directly supports the environmental, mobility, national security objectives of the Vehicle Systems Program and the Aeronautics Technology Theme. Technology deliverables include the demonstration through integrated ground tests, a constant volume combustor in an engine system, and UAV/small transport aircraft all electric power system. My mentor serves as a key member of the management team for the Aeropropulsion Research Program Office (ARPO). She has represented the office on numerous occasions, and is a member of a number of center-wide panels/teams, such as the Space management Committee and is chair to the Business Process Consolidation Team. She is responsible for the overall coordination of resources for the Propulsion and Power Project - from advocacy to implementation. The goal for my summer at NASA was to document processes and archive program documents from the past

  11. The software analysis project for the Office of Human Resources

    Science.gov (United States)

    Tureman, Robert L., Jr.

    1994-01-01

    There were two major sections of the project for the Office of Human Resources (OHR). The first section was to conduct a planning study to analyze software use with the goal of recommending software purchases and determining whether the need exists for a file server. The second section was analysis and distribution planning for retirement planning computer program entitled VISION provided by NASA Headquarters. The software planning study was developed to help OHR analyze the current administrative desktop computing environment and make decisions regarding software acquisition and implementation. There were three major areas addressed by the study: current environment new software requirements, and strategies regarding the implementation of a server in the Office. To gather data on current environment, employees were surveyed and an inventory of computers were produced. The surveys were compiled and analyzed by the ASEE fellow with interpretation help by OHR staff. New software requirements represented a compilation and analysis of the surveyed requests of OHR personnel. Finally, the information on the use of a server represents research done by the ASEE fellow and analysis of survey data to determine software requirements for a server. This included selection of a methodology to estimate the number of copies of each software program required given current use and estimated growth. The report presents the results of the computing survey, a description of the current computing environment, recommenations for changes in the computing environment, current software needs, management advantages of using a server, and management considerations in the implementation of a server. In addition, detailed specifications were presented for the hardware and software recommendations to offer a complete picture to OHR management. The retirement planning computer program available to NASA employees will aid in long-range retirement planning. The intended audience is the NASA civil

  12. Projects at the Western Environmental Technology Office. Quarterly technical progress report, April 1--June 30, 1995

    International Nuclear Information System (INIS)

    1995-01-01

    This report contains brief outlines of the multiple projects under the responsibility of the Western Environmental Technology Office in Butte Montana. These projects include biomass remediation, remediation of contaminated soils, mine waste technology, and several other types of remediation

  13. Sir Ronald Ross and the Malarial Parasite

    Indian Academy of Sciences (India)

    Home; Journals; Resonance – Journal of Science Education; Volume 11; Issue 7. Sir Ronald Ross and the Malarial Parasite - Discovery of its Route - From Man to Mosquito and Back. Shobhona Sharma. General Article Volume 11 Issue 7 July 2006 pp 4-13 ...

  14. Ronald Reagan and the Oral Tradition.

    Science.gov (United States)

    Gold, Ellen Reid

    1989-01-01

    Uses oral theory to examine the relationship between cognition and orality. Analyzes how the electronic media mimic the kind of interaction between speaker and audience characteristic of preliterate cultures. Argues that Ronald Reagan's effectiveness on television stems from his use of rhetorical structures characteristic of preliterate oral…

  15. Ronald Fisher forenede gener og evolution

    DEFF Research Database (Denmark)

    Alstrup, Aage Kristian Olsen; Winterdahl, Michael; Wang, Tobias

    2013-01-01

    Ronald Fisher var en sand kontroversiel pioner. Den dygtige matematiker anvendte blandt andet sine evner indenfor biologien og blev en af hovedmændene bag den moderne syntese, hvor genetik og evolution forenes. Hans syn på racehygiejne og sammenhængen mellem rygning og lungekræft gjorde ham dog til...

  16. Romantic Democracy, Ronald Reagan, and Presidential Heroes.

    Science.gov (United States)

    Fisher, Walter R.

    1982-01-01

    This practical criticism is written for communication scholars who seek further understanding of significant communication events. Believing that a romantic strain exists in American history/politics, this essay suggests characteristics of presidential heroes, relates Ronald Reagan's rhetoric to the romantic tradition, and compares his rhetoric…

  17. Payload specialist Ronald Parise using SAREX

    Science.gov (United States)

    1995-01-01

    ASTRO-2 payload specialist Ronald A. Parise reminisces on his inspace amateur radio experience of five years ago in the ASTRO-1 mission. Using the Shuttle Amateur Radio Experiment (SAREX), Parise talks to students on Earth from the flight deck of the Earth orbiting Space Shuttle Endeavour.

  18. Innovation in health service management: Adoption of project management offices to support major health care transformation.

    Science.gov (United States)

    Lavoie-Tremblay, Mélanie; Aubry, Monique; Cyr, Guylaine; Richer, Marie-Claire; Fortin-Verreault, Jean-François; Fortin, Claude; Marchionni, Caroline

    2017-11-01

    To explore the characteristics that influence project management offices acceptance and adoption in healthcare sector. The creation of project management offices has been suggested as a promising avenue to promote successful organisational change and facilitate evidence-based practice. However, little is known about the characteristics that promote their initial adoption and acceptance in health care sector. This knowledge is important in the context where many organisations are considering implementing project management offices with nurse managers as leaders. A descriptive multiple case study design was used. The unit of analysis was the project management offices. The study was conducted in three university-affiliated teaching hospitals in 2013-14 (Canada). Individual interviews (n = 34) were conducted with senior managers. Results reveal that project management offices dedicated to project and change management constitute an innovation and an added value that addresses tangible needs in the field. Project management offices are an innovation highly compatible with health care managers and their approach has parallels to the process of clinical problem solving and reasoning well-known to adopters. This knowledge is important in a context where many nurses hold various roles in project management offices, such as Director, project manager, clinical expert and knowledge broker. © 2017 John Wiley & Sons Ltd.

  19. ANALYSIS OF THE POSSIBILITY FOR ESTABLISHING PROJECT MANAGEMENT OFFICE (PMO IN COMPANIES IN SERBIA

    Directory of Open Access Journals (Sweden)

    Dragana Milin

    2012-09-01

    Full Text Available Project Management Office (PMO is an organizational unit established to help project managers, project teams and the various levels of management in carrying out the principles of project management. The research was carried out in Serbia, in 2011, with the aim to establish which methodologies and techniques are used for project m anagement, and which of them are used the most frequently. Furthermore, the need for establishment of PMOs in Serbia is discussed. These offices should help in establishing a standardized methodology (at the organization level and thus overcome the obviou s poor use of any project management methodology at all.

  20. Experiences of unemployed clients with services offered them by the front office of the Bridge project

    OpenAIRE

    Twum, Sampson

    2010-01-01

    The purpose of this study was to examine the experiences of unemployed clients of the Bridge project to the services offered them by the front office. The Bridge project organises programs to ease immigrant’s integration. The project also aid immigrant’s integration with supervision, information and education through front office activity. This study used a qualitative research approach and the method of data collection was in-depth interviews. The participants were selected using snow b...

  1. US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36 was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building

  2. Plutonium immobilization project development and testing technical project office quality assurance program description

    International Nuclear Information System (INIS)

    Gould, T.H.; MacLean, L.M.; Ziemba, J.M.

    1999-01-01

    The Plutonium Immobilization Project (PIP) is one of several fissile materials disposition projects managed by the Department of Energy (DOE) Office of Fissile Materials Disposition (OFMD). The PIP is expected to evolve from the current Development and Testing (D and T) effort, to design, to construction, and finally to operations. Overall management and technical management of the D and T effort resides at the Lead Laboratory, Lawrence Livermore National Laboratory (LLNL), through the LLNL Manager, Fissile Materials Disposition Program (FMDP). Day to day project activities are managed by the D and T Technical Project Office (TPO), which reports to the LLNL Manager, FMDP. The D and T TPO consists of the Technical Manager, the TPO Quality Assurance (QA) Program Manager, and TPO Planning and Support Staff. This Quality Assurance Program Description (QAPD) defines the QA policies and controls that will be implemented by these TPO personnel in their management of D and T activities. This QAPD is consistent with and responsive to the Department of Energy Fissile Materials Disposition Program Quality Assurance Requirements Document (FMDP QARD). As the Project and upper level requirement's documents evolve, this QAPD will be updated as necessary to accurately define and describe the QA Program and Management of the PIP. The TPO has a policy that all development and testing activities be planned, performed and assessed in accordance with its customer's requirements, needs and expectations, and with a commitment to excellence and continuous improvement. The TPO QAPD describes implementation requirements which, when completed, will ensure that the project development and testing activities conform to the appropriate QA requirements. For the program to be effective, the TPO QA Program Manager will ensure that each site participating in D and T activities has developed a QAPD, which meets the customer's requirements, and has a designated quality leader in place. These customer

  3. Financial Management in the Strategic Systems Project Office.

    Science.gov (United States)

    SSPO, the largest program office in the Navy and in existence for over 20 years, has perfected time tested financial management procedures which may...serve as a model for the student of program management. This report presents an overview of the SSPO financial management concepts and general

  4. The hands-on project office guaranteeing ROI and on-time delivery

    CERN Document Server

    Kesner, Richard M

    2003-01-01

    THE THREE PILLARS OF IT DELIVERY - PROBLEM RESOLUTION, SERVICE REQUESTS, AND PROJECTSIntroduction The Business Context The Internal Economy for Investing in IT Services and ProjectsThe Three Pillars of IT Delivery Managing Service DeliveryManaging Project Commitments IT Metrics and Reporting Tools THE PROJECT MANAGEMENT OFFICE BUSINESS MODELIntroduction: Revisiting the IT Organization IT Service and Project Delivery RolesThe Role of the Project Management Office: Measuring its ROI The PMO Value Proposition: An Initial ROI Estimate ALIGNMENT AND PLANNING - DOING THE RIGHT THINGS Introduction Ge

  5. State of Nevada, Agency for Nuclear Projects/Nuclear Waste Project Office narrative report, January 1992

    International Nuclear Information System (INIS)

    1992-01-01

    The Agency for Nuclear Projects/Nuclear Waste Project Office (NWPO) is the State of Nevada agency designated by State law to monitor and oversee US Department of Energy (DOE) activities relative to the possible siting, construction, operation and closure of a high-level nuclear waste repository at Yucca Mountain and to carry out the State of Nevada's responsibilities under the Nuclear Waste Policy Act of 1982. During the reporting period the NWPO continued to work toward the five objectives designed to implement the Agency's oversight responsibilities: (1) Assure that the health and safety of Nevada's citizens are adequately protected with regard to any federal high-level radioactive waste program within the State; (2) Take the responsibilities and perform the duties of the State of Nevada as described in the Nuclear Waste Policy Act of 1982 (Public Law 97-425) and the Nuclear Waste Policy Amendments Act of 1987; (3) Advise the Governor, the State Commission on Nuclear Projects and the Nevada State Legislature on matters concerning the potential disposal of high-level radioactive waste in the State; (4) Work closely and consult with affected local governments and State agencies; (5) Monitor and evaluate federal planning and activities regarding high-level radioactive waste disposal. Plan and conduct independent State studies regarding the proposed repository

  6. Grand Junction Projects Office Remedial Action Project Building 2 public dose evaluation. Final report

    International Nuclear Information System (INIS)

    Morris, R.

    1996-05-01

    Building 2 on the U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) site, which is operated by Rust Geotech, is part of the GJPO Remedial Action Program. This report describes measurements and modeling efforts to evaluate the radiation dose to members of the public who might someday occupy or tear down Building 2. The assessment of future doses to those occupying or demolishing Building 2 is based on assumptions about future uses of the building, measured data when available, and predictive modeling when necessary. Future use of the building is likely to be as an office facility. The DOE sponsored program, RESRAD-BUILD, Version. 1.5 was chosen for the modeling tool. Releasing the building for unrestricted use instead of demolishing it now could save a substantial amount of money compared with the baseline cost estimate because the site telecommunications system, housed in Building 2, would not be disabled and replaced. The information developed in this analysis may be used as part of an as low as reasonably achievable (ALARA) cost/benefit determination regarding disposition of Building 2

  7. Accelerating Project and Process Improvement using Advanced Software Simulation Technology: From the Office to the Enterprise

    Science.gov (United States)

    2010-04-29

    Technology: From the Office Larry Smith Software Technology Support Center to the Enterprise 517 SMXS/MXDEA 6022 Fir Avenue Hill AFB, UT 84056 801...2010 to 00-00-2010 4. TITLE AND SUBTITLE Accelerating Project and Process Improvement using Advanced Software Simulation Technology: From the Office to

  8. Report: EPA Managers Did Not Hold Supervisors and Project Officers Accountable for Grants Management

    Science.gov (United States)

    Report #2005-P-00027, September 27, 2005. Managers did not sufficiently hold supervisors and project officers accountable for grants management because there is no process to measure most grants management activity.

  9. Region 9 Tribal Grant Program - Project Officer and Tribal Contact Information Map Service

    Science.gov (United States)

    This compilation of geospatial data is for the purpose of managing and communicating information about current EPA project officers, tribal contacts, and tribal grants, both internally and with external stakeholders.

  10. Agency for Nuclear Projects/Nuclear Waste Project Office final progress report

    International Nuclear Information System (INIS)

    1992-01-01

    The Nevada Agency for Nuclear Projects/Nuclear Waste Project Office (NWPO) was formally established by Executive Policy in 1983 following passage of the federal Nuclear Waste Policy Act of 1982 (Act). That Act provides for the systematic siting, construction, operation, and closure of high-level radioactive defense and research by-products and other forms of high-level radioactive waste from around the country which will be stored at such repositories. In 1985 the Nevada legislature formally established the NWPO as a distinct and statutorily authorized agency to provide support to the Governor and State Legislature on matters concerning the high-level nuclear waste programs. The NWPO utilized a small, central staff supplemented by contractual services for needed technical and specialized expertise in order to provide high quality oversight and monitoring of federal activities, to conduct necessary independent studies, and to avoid unnecessary duplication of efforts. This report summarizes the results of this ongoing program to ensure that risks to the environment and to human safety are minimized. It includes findings in the areas of hydrogeology, geology, quality assurance activities, repository engineering, legislature participation, socioeconomic affects, risk assessments, monitoring programs, public information dissemination, and transportation activities. The bulk of the reporting deals with the Yucca Mountain facility

  11. Obituary: Ronald Cecil Stone, 1946-2005

    Science.gov (United States)

    Monet, Alice Kay Babcock

    2006-12-01

    Ronald C. Stone, an astronomer at the US Naval Observatory Flagstaff Station, passed away on 10 September 2005 in Downer's Grove, IL, following a valiant struggle with cancer. He was fifty-nine years old. Ron was born on 9 June 1946 in Seattle, Washington, to Helen (Vocelka) and Cecil Stone. His father was a World War II veteran who attended college on the GI Bill and became a mechanical engineer. He and his wife raised three sons: Dwight, Ronald, and Gavin. They lived in a number of locations across the U.S. before settling at last in Downer's Grove when Ron was in the fourth grade. Ron's interest in astronomy began when he was given a toy planetarium projector while still in grade school, and later a small telescope. In high school, he also built his own telescope, grinding the 6-inch mirror by hand. He completed grade school and high school in Downer's Grove and did his undergraduate studies at the University of Illinois at Urbana-Champaign, majoring in astronomy and physics and graduating cum laude in 1968. The following year, he was drafted into the U.S. Army and served for two years, including a stint in Vietnam. Although his primary assignment was auditing, he was also involved in the defense of the Long Binh base in Vietnam. He was honorably discharged from the service in 1971 and enrolled that fall at the University of Chicago. While a graduate student working with Bill van Altena, Ron developed his life long interest in the field of astrometry. Van Altena recalls him as "a quiet and cheerful student who wanted to learn, and [who] worked hard to understand the intricacies of astrometry... deriving the most precise proper motions from the 40-inch [Yerkes] refractor plates." Working at Yerkes Observatory in Williams Bay, Wisconsin, he completed a thesis entitled, "Mean Secular Parallax at Low Galactic Latitude." While living in Wisconsin, Ron also became engaged to Ellen Mickel, and the two were married at his parents' home in Downer's Grove. After earning

  12. UMTRA project office federal employee occupational safety and health program plan

    International Nuclear Information System (INIS)

    1994-06-01

    This document establishes the Federal Employee Occupational Safety and Health (FEOSH) Program for the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project Office. This program will ensure compliance with applicable requirements of DOE Order 3790.1B and DOE Albuquerque Operations Office (AL) Order 3790.lA. FEOSH Program responsibilities delegated by the DOE-AL to the UMTRA Project Office by AL Order 3790.1A also are assigned. The UMTRA Project Office has developed the UMTRA Project Environmental, Safety, and Health (ES ampersand H) Plan (DOE, 1992), which establishes the basic programmatic ES ampersand H requirements for all participants on the UMTRA Project. The ES ampersand H plan is designed primarily to cover remedial action activities at UMTRA sites and defines the ES ampersand H responsibilities of both the UMTRA Project Office and its contractors. The UMTRA FEOSH Program described herein is a subset of the overall UMTRA ES ampersand H program and covers only federal employees working on the UMTRA Project

  13. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52 was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building

  14. Ronald Coase and the Methodology of Economics

    OpenAIRE

    Sam Peltzman

    2011-01-01

    Ronald Coase was skeptical that economics is a positive science in the sense made famous by Milton Friedman. According to Coase, that notion is inaccurate on two counts: economists accept much theory without bothering to test it empirically, and much of their empirical work does not test theory. Coase's view is that we seek (and find) truth in economics via a competition of ideas that uses an eclectic variety of methods. I argue that, as a description of what empirical economics is about, muc...

  15. Building Bridges: Using the Office Consultation Project to Connect Students to Theory and Practice

    Science.gov (United States)

    Wawrzynski, Korine Steinke; Jessup-Anger, Jody E.

    2014-01-01

    The Office Consultation Project is an innovative capstone project that partners graduate students in student affairs preparation programs with academic and student affairs practitioners. It provides an opportunity for students to apply research and scholarship to practical settings, while giving practitioners new insight into their units,…

  16. INVENTORY OF ECOSYSTEM RESTORATION PROJECTS - PUBLISHED ON THE OFFICE OF WATER WEB PAGE

    Science.gov (United States)

    USEPA's National Risk Management Research Laboratory working jointly with the Office of Water, has developed an Internet-accessible database of ecosystem restoration projects within the Mid-Atlantic Integrated Assessment (MAIA) region. This article informs project owners of the i...

  17. Project officer's perspective: quality assurance as a management tool.

    Science.gov (United States)

    Heiby, J

    1993-06-01

    Advances in the management of health programs in less developed countries (LDC) have not kept pace with the progress of the technology used. The US Agency for International Development mandated the Quality Assurance Project (QAP) to provide quality improvement technical assistance to primary health care systems in LDCs while developing appropriate quality assurance (QA) strategies. The quality of health care in recent years in the US and Europe focused on the introduction of management techniques developed for industry into health systems. The experience of the QAP and its predecessor, the PRICOR Project, shows that quality improvement techniques facilitate measurement of quality of care. A recently developed WHO model for the management of the sick child provides scientifically based standards for actual care. Since 1988, outside investigators measuring how LDC clinicians perform have revealed serious deficiencies in quality compared with the program's own standards. This prompted developed of new QA management initiatives: 1) communicating standards clearly to the program staff; 2) actively monitoring actual performance corresponds to these standards; and 3) taking action to improve performance. QA means that managers are expected to monitor service delivery, undertake problem solving, and set specific targets for quality improvement. Quality improvement methods strengthen supervision as supervisors can objectively assess health worker performance. QA strengthens the management functions that support service delivery, e.g., training, records management, finance, logistics, and supervision. Attention to quality can contribute to improved health worker motivation and effective incentive programs by recognition for a job well done and opportunities for learning new skills. These standards can also address patient satisfaction. QA challenges managers to aim for the optimal level of care attainable.

  18. Implementation of a Project Management Office (PMO)--experiences from year 1.

    Science.gov (United States)

    Isola, Miriam; Polikaitis, Audrius; Laureto, Rose Ann

    2006-01-01

    Recognized as an early leader in clinical information systems, the University of Illinois Medical Center was challenged to meet the ever-increasing demand for information systems. Interviews with key stakeholders revealed unfavorable attitudes toward the Information Services department. Reasons given were that projects often are not aligned with business strategy, projects are delayed, IS itself is a barrier to progress, and a lack of proactive planning precipitates crises. Under the leadership of a new CIO, IS began developing a Project Management Office, or PMO, to better meet medical center business objectives and to more effectively manage technology projects. Successes during the first year included comprehensive IT strategic planning. Collaborative relationships were established with departmental leaders for planning, prioritizing, budgeting, and executing projects. A formal Web-based process for requesting IS projects was implemented, project management training was provided, and elements of standard project management methodology were implemented. While a framework for effective project management was created, significant effort is still required to firmly root these new processes within the organizational culture. Project management office goals for the second year include implementing a project portfolio management tool, refining the benefits methodology, and continuing the advancement of the project management methodology.

  19. PROJECT MANAGEMENT OFFICE – LINK BETWEEN ORGANIZATIONAL STRATEGIC AND OPERATIONAL: A CASE STUDY

    Directory of Open Access Journals (Sweden)

    Mario Manzini Cianfanelli

    2014-12-01

    Full Text Available The objective of this work is to demonstrate the organizational integration achieved through the implementation of a project management office (PMO, created to combat the loss of water distribution in one of the business units of Basic Sanitation Company of the State of São Paulo – Sabesp. The methodology used to achieve this goal was the study of a single case in which the information was obtained through documentary research and semi-structured interviews. The results showed how this integration was achieved with the adoption of a standard methodology in project management, control based on information technology and the spread of the organization's strategy in the sectors below. This work concluded that with this implantation of the project management office it was possible to improve the planning and the control of the activities of the projects through a pattern methodology in managing projects that gave possibilities to create a new culture focusing in solving problems.

  20. Statement of John H. Anttonen, Project Manager, Basalt Waste Isolation Project, Richland Operations Office, Department of Energy

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    My name is John Anttonen and I am the Project Manager for the Basalt Waste Isolation Project (BWIP) at the Department of Energy Richland Operation Office. The responsibilities of may office are to manage the day-to-day activities of the site suitability investigations of the basalt formations at the Hanford Site, a Department complex that is involved in a variety of national missions, including defense materials production, nuclear energy research, and radioactive waste management. In may prepared comments today I would like to touch upon four specific subject areas relating to the BWIP program and then I would be happy to answer any questions you might have. The topics I will cover are: (1) historical aspects; (2) site specific technical issues and how they will be addressed during site characterization of the basalt site at Hanford; (3) current project status and; (4) institutional interaction. For clarity, I have attached several charts to my statement

  1. Project Management Series Case Study: The Office of Registration and Records

    Science.gov (United States)

    Burgher, Karl E.; Snyder, Michael

    2012-01-01

    This is the third in a series of eight articles on project management (PM) in the academy. In this article, the authors describe the step-by-step implementation of a structural change to Indiana State University's (ISU's) Office of Registration and Records (ORR). The process described may vary as it is implemented elsewhere, but the authors…

  2. Hayes Receives 2012 Ronald Greeley Early Career Award in Planetary Science: Response

    Science.gov (United States)

    Hayes, Alexander G.

    2013-10-01

    I am deeply honored to be the inaugural recipient of the Ronald Greeley Early Career Award. Ron was an icon in the field of planetary science, and the establishment of this award is a fitting way to pay tribute to his legacy. I applaud Laurie Leshin, Bill McKinnon, and the rest of the AGU Planetary Science section officers and selection committee for taking the time to organize this memorial. Ron is remembered not only for his fundamental scientific contributions but also for his mentorship and support of early-career scientists, both his own students and postdocs and those of his colleagues.

  3. NOAA Ship Ronald Brown Underway Meteorological Data, Quality Controlled

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NOAA Ship Ronald Brown Underway Meteorological Data (delayed ~10 days for quality control) are from the Shipboard Automated Meteorological and Oceanographic System...

  4. NOAA Ship Ronald Brown Underway Meteorological Data, Near Real Time

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NOAA Ship Ronald Brown Underway Meteorological Data (Near Real Time, updated daily) are from the Shipboard Automated Meteorological and Oceanographic System (SAMOS)...

  5. Official portrait of Astronaut Ronald E. McNair

    Science.gov (United States)

    1985-01-01

    Official portrait of Astronaut Ronald E. McNair. McNair is in the blue shuttle flight suit, standing in front of a table which holds a model of the Space Shuttle. An American flag is visible behind him.

  6. The Role of the Project Management Office on Information Technology Project Success

    Science.gov (United States)

    Stewart, Jacob S.

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. Assessing critical success factors is another…

  7. Ship Track for Lost City 2005 - Office of Ocean Exploration

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Ship track of the NOAA ship Ronald H. Brown during the "Lost City 2005" expedition sponsored by the National Oceanic and Atmospheric Administration (NOAA) Office of...

  8. The use of on-site Project Officers by a nuclear regulatory body

    International Nuclear Information System (INIS)

    Beare, J.W.

    1977-01-01

    In Canada consideration of applications for licensing nuclear installations is entrusted to the Reactor Safety Advisory Committee within the Atomic Energy Control Board (AECB). The licensing procedure is conducted in three stages (site approval, construction licence, operating licence). In order to control construction and operation of nuclear installations Project Officers are assigned to each particular installation. The policy of AECB is to send these officers on site several months before the reactor reaches criticality; and during reactor operation. This system clearly provides great practical advantages. (NEA) [fr

  9. Conflict free implementation of strategic project management office at the Entitie level utilizing “Evaporated cloud” diagram

    OpenAIRE

    Oganov, A.; Gogunsky, V.

    2015-01-01

    The analysis of reports on the last researches in area of project management office (PMO) in the organizations is carried out. Comparison of approaches in project management at the entities with PMO of different levels of a maturity and without it is executed. It is shown that the effectiveness of organizations orientation determined by the level of activity on project approaches, implemented with the help of Project Management Office through continuous improvement of design processes and ope...

  10. Statement of J.O. Neff, Manager, Salt Repository Project Office, Department of Energy

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    My name is Jeff Neff and I am the Manager of the US Department of Energy's Salt Repository Project Office, now located in Hereford, Texas. The responsibilities of my office are to manage the day-to-day activities of the site suitability investigations of the designated nine-square-mile site located in Deaf Smith County, near Hereford in the Texas Panhandle. The location is indicated on several of the attachments. My remarks will be divided into five categories: (1) a brief history of how the Deaf Smith County site was designated; (2) a review of major issues for the Texas site and how these are expected to be resolved during site characterization; (3) a summary of major institutional issues; (4) a summary of consultation and cooperation activities with the State of Texas, through its Nuclear Waste Programs Office; and (5) highlights of current and past interactions with local governmental officials and the public in the Panhandle

  11. Public health response to radiation emergencies and the role of the Helsinki Project Office

    International Nuclear Information System (INIS)

    Baverstock, Keith F.

    1997-01-01

    This paper focuses on the public health element of nuclear emergency preparedness, defined as the mitigation of the long-term effects of radiation on exposed populations, as opposed to dealing with the health consequences of an exposure in an individual (termed medical aspects). The paper also approaches to the role of the Helsinki Project Office which is concerned with the protection of public health through effective response to nuclear emergencies, and falling into two categories, namely contingency planning or preparedness, and response

  12. Change of the layout of an office of a metallurgical company: simple projects, big solutions.

    Science.gov (United States)

    Duarte, Luiz Carlos da Silva; Eckhardt, Moacir; da Motta, Giordano Paulo

    2012-01-01

    The posture, a good organization and the proper layout of the environment and workplaces have a positive influence on the income of an employee. To develop the work it is used a methodology that addressed the study phases of the theory involving the subject, description of the current situation, preparation of conceptions, choice of design, implementation and reporting of results. Through the project of "Change of the layout of an office of a metallurgical company" there was an intervention in these reported aspects providing improvements in the office, regarding ergonomic, layout, workplace and lighting issues, bringing welfare to the official, with the intent to improve its performance within the company and facilitating its actions, as the company's customer service. The results provided improvements in layout, in the workplace and especially in comfort for the human resources that perform their activities.

  13. Historical Post Office Directory Parser (POD Parser Software From the AddressingHistory Project

    Directory of Open Access Journals (Sweden)

    Nicola Osborne

    2014-07-01

    Full Text Available The POD Parser is Python software for parsing the OCR’d (optical character recognised text of digitised historical Scottish Post Office Directories (PODs to produce a consistent structured format for the data and for geocoding each address. The software was developed as part of the AddressingHistory project which sought to combine digitised historic directories with digitised and georeferenced historic maps.  The software has potential for reuse in multiple research contexts where historical post office directory data is relevant, and is therefore particularly of use in historical research into social, economic or demographic trends. The POD Parser is currently designed for use with Scottish directories but is extensible, perhaps with some adaptation, to use with other similarly formatted materials such as the English Trade Directories.

  14. The healthy workplace project: Reduced viral exposure in an office setting.

    Science.gov (United States)

    Reynolds, Kelly A; Beamer, Paloma I; Plotkin, Kevin R; Sifuentes, Laura Y; Koenig, David W; Gerba, Charles P

    2016-05-03

    Viral illnesses such as gastroenteritis and the common cold create a substantial burden in the workplace due to reduced productivity, increased absenteeism, and increased health care costs. Behaviors in the workplace contribute to the spread of human viruses via direct contact between hands, contaminated surfaces, and the mouth, eyes, and/or nose. This study assessed whether implementation of the Healthy Workplace Project (HWP) (providing hand sanitizers, disinfecting wipes, facial tissues, and use instructions) would reduce viral loads in an office setting of approximately 80 employees after seeding fomites and the hands of volunteer participants with an MS-2 phage tracer. The HWP significantly reduced viable phage detected on participants' hands, communal fomites, and personal fomites (p ≤ .010) in office environments and presents a cost-effective method for reducing the health and economic burden associated with viral illnesses in the workplace.

  15. 78 FR 17646 - Agency Information Collection Activities; Comment Request; Ronald E. McNair Postbaccalaureate...

    Science.gov (United States)

    2013-03-22

    ...; Comment Request; Ronald E. McNair Postbaccalaureate Achievement Program Annual Performance Report AGENCY... of Collection: Ronald E. McNair Postbaccalaureate Achievement Program Annual Performance Report. OMB...: Ronald E. McNair Postbaccalaureate Achievement (McNair) Program Annual Performance Report Program...

  16. Energy edge post-occupancy evaluation project: the Hollywood Office Building, Portland, Oregon

    Energy Technology Data Exchange (ETDEWEB)

    1990-06-01

    The Hollywood Office Park Building Survey for the Energy Post- Occupancy Project was administered to nine building occupants. The nine respondents answered the questions which rated building features in the areas of (1) thermal factors; (2) air quality; (3) lighting; (4) acoustics; and, (5) overall workspace satisfaction. In addition to rating these ambient environmental features, these respondents also rated their satisfaction of various functional and aesthetic features and specific kinds of workspaces. Data was also collected on heath characteristics and occupational demographics of the respondents. No analysis is made of the survey findings which are reported in graphic format. 15 figs. (BN)

  17. Implementing Earned Value Management in the CxP EVA Systems Project Office

    Science.gov (United States)

    Sorge, Les L.

    2009-01-01

    Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

  18. A Health Care Project Management Office's Strategies for Continual Change and Continuous Improvement.

    Science.gov (United States)

    Lavoie-Tremblay, Mélanie; Aubry, Monique; Richer, Marie-Claire; Cyr, Guylaine

    Health care organizations need project and change management support in order to achieve successful transformations. A project management office (PMO) helps support the organizations through their transformations along with increasing their capabilities in project and change management. The aim of the present study was to extend understanding of the continuous improvement mechanisms used by PMOs and to describe PMO's strategies for continual change and continuous improvement in the context of major transformation in health care. This study is a descriptive case study design with interviews conducted from October to December 2015 with PMO's members (3 managers and 1 director) and 3 clients working with the PMO after a major redevelopment project ended (transition to the new facility). Participants suggested a number of elements including carefully selecting the members of the PMO, having a clear mandate for the PMO, having a method and a discipline at the same time as allowing openness and flexibility, clearly prioritizing projects, optimizing collaboration, planning for everything the PMO will need, not overlooking organizational culture, and retaining the existing support model. This study presents a number of factors ensuring the sustainability of changes.

  19. THE CONTEXT OF ESTABLISHING PROJECT MANAGEMENT OFFICES IN THE IT AREA: TWO CASE STUDIES

    Directory of Open Access Journals (Sweden)

    Andrea Giovanni Spelta

    2010-01-01

    Full Text Available Completing strategic Information Technology (IT projects as planned is certainly an important objective for large firms. One of the measures adopted to reach this goal systematically is to create a Project Management Office in the IT area (PMO-IT. However, many firms consider the possibility of creating a PMO-IT, but decide not to do it. This paper presents the results of an exploratory research about the contextual drivers that determine the decision to create PMO-Its. Through two case studies of large Brazilian firms – one that created the entity and another which believes does not need it –, the drivers of the decision to create or not to create a PMO-IT were identified, and it was possible to confirm some of the drivers mentioned in the literature. This paper increases the undertstanding about this topic, which is important in the Management Information Systems field, as well as indicates paths for future research.

  20. Entrapment and Escape: Inventional Metaphors in Ronald Reagan's Economic Rhetoric.

    Science.gov (United States)

    Aden, Roger C.

    1989-01-01

    Examines Ronald Reagan's use of inventional metaphors of entrapment and escape, language meshing with the American public's perception of the economy in the early 1980s. Notes that Reagan's reliance on inventional metaphors produced a rigidity in his approach to new situations, ultimately damaging his ability to lead the nation. (MM)

  1. Ronald Reagan ja Eesti iseseisvus / Jüri Luik

    Index Scriptorium Estoniae

    Luik, Jüri, 1966-

    2004-01-01

    Eesti suursaadik USA-s kinnitab, et USA ekspresident Ronald Reagan äratas idablokis inimeste moraalse ja vaimse jõu, hävitas hirmu ning Eesti võlgneb talle huku äärelt pääsemise. Reagani revolutsioonilisest jõust nii sise- kui välispoliitikas, kommunismivastasusest ja NSVL-i vaimsest purustamisest

  2. 76 FR 66072 - Albert Ronald Cioffi: Debarment Order

    Science.gov (United States)

    2011-10-25

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2011-N-0159] Albert Ronald Cioffi: Debarment Order AGENCY: Food and Drug Administration, HHS. ACTION: Notice. SUMMARY... Administration, 5630 Fishers Lane, rm. 1061, Rockville, MD 20852. FOR FURTHER INFORMATION CONTACT: Kenny Shade...

  3. President Ronald Reagan speaks at STS 51-L Memorial service

    Science.gov (United States)

    1986-01-01

    President Ronald Reagan tells a large turnout of JSC employees and family and friends of the 51-L crewmembers about their accomplishments and sacrifices during memorial services held following the Challenger accident at Kennedy Space Center (KSC).'They slipped the surly bonds of earth to touch the face of God' the President told the thousands gathered on the central mall at JSC.

  4. Het laatste avondmaal: Ronald Dworkin (1931-2013)

    NARCIS (Netherlands)

    Maris, C.

    2013-01-01

    Op 14 februari 2013 overleed Ronald Dworkin, de invloedrijkste rechtsfilosoof van de afgelopen decennia. Cees Maris schrijft in deze bijdrage over de opvattingen van Dworkin, het Juiste Antwoord, morele waarheid, zijn publicaties en deelname aan publieke discussies, maar ook over de kritiek die

  5. Payload specialist Ronald Parise checks on ASTRO-2 payload

    Science.gov (United States)

    1995-01-01

    Payload specialist Ronald A. Parise, a senior scientist in the Space Observatories Department of Computer Sciences Corporation (CSC), checks on the ASTRO-2 payload (out of frame in the cargo bay of the Space Shuttle Endeavour). Parise is on the aft flight deck of the Earth orbiting Endeavour during STS-67.

  6. Teaching weather and climate science in primary schools - a pilot project from the UK Met Office

    Science.gov (United States)

    Orrell, Richard; Liggins, Felicity; Challenger, Lesley; Lethem, Dom; Campbell, Katy

    2017-04-01

    Wow Schools is a pilot project from the Met Office with an aim to inspire and educate the next generation of scientists and, uniquely, use the data collected by schools to improve weather forecasts and warnings across the UK. Wow Schools was launched in late 2015 with a competition open to primary schools across the UK. 74 schools entered the draw, all hoping to be picked as one of the ten lucky schools taking part in the pilot scheme. Each winning school received a fully automatic weather station (AWS), enabling them to transmit real-time local weather observations to the Met Office's Weather Observation Website (WOW - wow.metoffice.gov.uk), an award winning web portal for uploading and sharing a range of environmental observations. They were also given a package of materials designed to get students out of the classroom to observe the weather, get hands-on with the science underpinning weather forecasting, and analyse the data they are collecting. The curriculum-relevant materials were designed with the age group 7 to 11 in mind, but could be extended to support other age groups. Each school was offered a visit by a Wow Schools Ambassador (a Met Office employee) to bring the students' learning to life, and access to a dedicated forecast for its location generated by our new supercomputer. These forecasts are improved by the school's onsite AWS reinforcing the link between observations and forecast production. The Wow Schools pilot ran throughout 2016. Here, we present the initial findings of the project, examining the potential benefits and challenges of working with schools across the UK to: enrich students' understanding of the science of weather forecasting; to source an ongoing supply of weather observations and discover how these might be used in the forecasting process; and explore what materials and business model(s) would be most useful and affordable if a wider roll-out of the initiative was undertaken.

  7. Using Student Surveys to Monitor Teacher Effectiveness: Q&A with Dr. Ronald Ferguson. REL Mid-Atlantic Teacher Effectiveness Webinar Series

    Science.gov (United States)

    Regional Educational Laboratory Mid-Atlantic, 2013

    2013-01-01

    In this webinar, Dr. Ronald Ferguson, creator of the Tripod Project and Senior Lecturer at Harvard University Graduate School of Education, discussed the use of student surveys as an approach to measuring teacher effectiveness. This Q&A addressed the questions participants had for Dr. Ferguson following the webinar. The webinar recording and…

  8. Office of Legacy Management Decision Tree for Solar Photovoltaic Projects - 13317

    International Nuclear Information System (INIS)

    Elmer, John; Butherus, Michael; Barr, Deborah L.

    2013-01-01

    To support consideration of renewable energy power development as a land reuse option, the DOE Office of Legacy Management (LM) and the National Renewable Energy Laboratory (NREL) established a partnership to conduct an assessment of wind and solar renewable energy resources on LM lands. From a solar capacity perspective, the larger sites in the western United States present opportunities for constructing solar photovoltaic (PV) projects. A detailed analysis and preliminary plan was developed for three large sites in New Mexico, assessing the costs, the conceptual layout of a PV system, and the electric utility interconnection process. As a result of the study, a 1,214-hectare (3,000-acre) site near Grants, New Mexico, was chosen for further study. The state incentives, utility connection process, and transmission line capacity were key factors in assessing the feasibility of the project. LM's Durango, Colorado, Disposal Site was also chosen for consideration because the uranium mill tailings disposal cell is on a hillside facing south, transmission lines cross the property, and the community was very supportive of the project. LM worked with the regulators to demonstrate that the disposal cell's long-term performance would not be impacted by the installation of a PV solar system. A number of LM-unique issues were resolved in making the site available for a private party to lease a portion of the site for a solar PV project. A lease was awarded in September 2012. Using a solar decision tree that was developed and launched by the EPA and NREL, LM has modified and expanded the decision tree structure to address the unique aspects and challenges faced by LM on its multiple sites. The LM solar decision tree covers factors such as land ownership, usable acreage, financial viability of the project, stakeholder involvement, and transmission line capacity. As additional sites are transferred to LM in the future, the decision tree will assist in determining whether a solar

  9. The Curriculum Improvement Project in Business Careers Programs: Business Manager, Officer Administrator, Real Estate Agent, Real Estate Broker.

    Science.gov (United States)

    College of the Mainland, Texas City, TX.

    In 1987, the College of the Mainland undertook a project to update curricula in real estate, business management, and office technology. The project entailed a survey of the labor market to clarify personnel needs in selected fields; the use of the DACUM (Developing a Curriculum) process, which involved expert workers in the creation of task…

  10. Research and Grant Management: The Role of the Project Management Office (PMO) in a European Research Consortium Context

    Science.gov (United States)

    Wedekind, Gerben Kristian; Philbin, Simon Patrick

    2018-01-01

    This paper illustrates how a university-based project management office (PMO) can provide focused support across the entire grant project lifecycle within a European research context. In recent years, EU (European Union) research and innovation grant programs have increasingly shifted to support multidisciplinary consortia composed of industry,…

  11. Obituary: Ronald Eugene Pitts, 1949-2008

    Science.gov (United States)

    MacConnell, D. Jack

    2009-01-01

    Ronald Pitts, systems engineer in the Commanding Branch of the Space Telescope Science Institute and long-time Computer Sciences Corporation employee, died suddenly of a stroke on 4 May 2008 at his home in Laurel, Maryland. He was a dedicated scientist-engineer, husband, father, volunteer, and cherished friend to many. Ron was born on 19 January 1949 in Tucson, Arizona, and was raised, along with his sister Suzanne, on his parents' turkey farm outside Tucson. He picked up practical knowledge from his father, Vernon, and became a competent amateur electrician and plumber, skills he kept honed and used throughout his life. His mother, Ruth (Stephens), was a nurse and taught him compassion and patience and encouraged his inquisitive mind. Ron attended public schools and enrolled at the University of Arizona, graduating with a B. S. in Astronomy in 1971. Being from a family of modest means, he put himself through school working summers and part-time at a large copper mine south of town. Ron enrolled in the graduate astronomy program at the Ohio State University [OSU] in the fall of 1971 where he was a first-year fellowship student. During his second and third years, he was the Perkins Assistant, taking spectra for the very exacting but appreciative Philip Keenan who once remarked to another faculty member that Ron was the best observer he ever had. Later, in 1980, Ron was co-author with Keenan on "Revised MK Spectral Types for G, K, and M stars" and again in 1985 in a study of supergiants in open clusters. He met his future wife, Patricia Moore, also a graduate student in the department, and they were wed in 1973. Ron was also partially supported during his early OSU years by an NSF grant to Robert Wing, writing parts of Wing's photometric reduction code and observing on the program at Kitt Peak and Flagstaff in the summer of 1974. Wing remembers him as being very competent and pleasant to work with. Ron's thesis topic was "Oscillator Strengths for Neutral Iron and

  12. How does sustainability certification affect the design process? Mapping final design projects at an architectural office

    DEFF Research Database (Denmark)

    Landgren, Mathilde; Jensen, Lotte Bjerregaard

    2017-01-01

    process and informing the industry of them. This has led to optimised design processes such as Integrated Energy Design, in which many decisions related to energy consumption and indoor climate are made in the early design stages. The current tendency is to use an expanded notion of sustainability......, derived from the sustainability certification system itself, and to apply it even in the early design process. This perspective emphasises all phases of the life cycle of a building. The goal of the present study was to map how a Danish architectural office approached sustainability in the projects......The context of the study is the very strict regulation of energy consumption for operating buildings in Denmark. It is difficult to meet the requirements by system optimisation in the final design phase, so recent research has focused on ways of meeting the target by adapting the whole design...

  13. Reducing RN Vacancy Rate: A Nursing Recruitment Office Process Improvement Project.

    Science.gov (United States)

    Hisgen, Stephanie A; Page, Nancy E; Thornlow, Deirdre K; Merwin, Elizabeth I

    2018-06-01

    The aim of this study was to reduce the RN vacancy rate at an academic medical center by improving the hiring process in the Nursing Recruitment Office. Inability to fill RN positions can lead to higher vacancy rates and negatively impact staff and patient satisfaction, quality outcomes, and the organization's bottom line. The Model for Improvement was used to design and implement a process improvement project to improve the hiring process from time of interview through the position being filled. Number of days to interview and check references decreased significantly, but no change in overall time to hire and time to fill positions was noted. RN vacancy rate also decreased significantly. Nurse manager satisfaction with the hiring process increased significantly. Redesigning the recruitment process supported operational efficiencies of the organization related to RN recruitment.

  14. Office of Legacy Management Decision Tree for Solar Photovoltaic Projects - 13317

    Energy Technology Data Exchange (ETDEWEB)

    Elmer, John; Butherus, Michael [S.M. Stoller Corporation (United States); Barr, Deborah L. [U.S. Department of Energy Office of Legacy Management (United States)

    2013-07-01

    To support consideration of renewable energy power development as a land reuse option, the DOE Office of Legacy Management (LM) and the National Renewable Energy Laboratory (NREL) established a partnership to conduct an assessment of wind and solar renewable energy resources on LM lands. From a solar capacity perspective, the larger sites in the western United States present opportunities for constructing solar photovoltaic (PV) projects. A detailed analysis and preliminary plan was developed for three large sites in New Mexico, assessing the costs, the conceptual layout of a PV system, and the electric utility interconnection process. As a result of the study, a 1,214-hectare (3,000-acre) site near Grants, New Mexico, was chosen for further study. The state incentives, utility connection process, and transmission line capacity were key factors in assessing the feasibility of the project. LM's Durango, Colorado, Disposal Site was also chosen for consideration because the uranium mill tailings disposal cell is on a hillside facing south, transmission lines cross the property, and the community was very supportive of the project. LM worked with the regulators to demonstrate that the disposal cell's long-term performance would not be impacted by the installation of a PV solar system. A number of LM-unique issues were resolved in making the site available for a private party to lease a portion of the site for a solar PV project. A lease was awarded in September 2012. Using a solar decision tree that was developed and launched by the EPA and NREL, LM has modified and expanded the decision tree structure to address the unique aspects and challenges faced by LM on its multiple sites. The LM solar decision tree covers factors such as land ownership, usable acreage, financial viability of the project, stakeholder involvement, and transmission line capacity. As additional sites are transferred to LM in the future, the decision tree will assist in determining

  15. Astronaut Ronald Evans is suited up for EVA training

    Science.gov (United States)

    1972-01-01

    Astronaut Ronald E. Evans, command module pilot of the Apollo 17 lunar landing mission, is assisted by technicians in suiting up for extravehicular activity (EVA) training in a water tank in bldg 5 at the Manned Spacecraft Center (49970); Evans participates in EVA training in a water tank in bldg 5 at the Manned Spacecraft Center. The structure in the picture simulates the Scientific Instrument Module (SIM) bay of the Apollo 17 Service Module (49971).

  16. American Presidents and Their Attitudes, Beliefs, and Actions Surrounding Education and Multiculturalism. A Series of Research Studies in Educational Policy. Sixth Installment: Examining Presidents Ronald Reagan, George H. W. Bush, and William Jefferson Clinton. Research

    Science.gov (United States)

    Baptiste, H. Prentice; Orvosh-Kamenski, Heidi; Kamenski, Christopher J.

    2005-01-01

    This article focuses on the recent presidencies of Ronald Reagan, George H. W. Bush, and William Jefferson Clinton and is the sixth installment in a series that examines how presidents, through their office of power, have impacted U.S. citizens by their actions and policies. By viewing the presidents through a multicultural lense we can more…

  17. Confirmatory radiological survey of the Grand Junction Projects Office Remedial Action Project exterior portions, 1989-1995

    International Nuclear Information System (INIS)

    Forbes, G.H.; Egidi, P.V.

    1997-04-01

    The purpose of this independent assessment was to provide the U.S. Department of Energy (DOE) with an independent verification (IV) that the soil at the Grand Junction Projects Office (GJPO) complies with applicable DOE guidelines. Oak Ridge National Laboratory/ Environmental Technology Section (ORNL/ETS) which is also located at the GJPO, was assigned by DOE as the Independent Verification Contractor (IVC). The assessment included reviews of the decontamination and decommissioning plan, annual environmental monitoring reports, data in the pre- and post-remedial action reports, reassessment reports and IV surveys. Procedures and field methods used during the remediation were reviewed, commented on, and amended as needed. The IV surveys included beta-gamma and gamma radiation scans, soil sampling and analyses. Based on the data presented in the post-remedial action report and the results of the IV surveys, the remediation of the outdoor portions of the GJPO has achieved the objectives. Residual deposits of uranium contamination may exist under asphalt because the original characterization was not designed to identify uranium and subsequent investigations were limited. The IVC recommends that this be addressed with the additional remediation. The IVC is working with the remedial action contractor (RAC) to assure that final documentation WM be sufficient for certification. The IVC will address additional remediation of buildings, associated utilities, and groundwater in separate reports. Therefore, this is considered a partial verification

  18. Project Execution Plan, Waste Management Division, Nevada Operations Office, U.S. Department of Energy, April 2000

    International Nuclear Information System (INIS)

    2000-01-01

    This plan addresses project activities encompassed by the U.S. Department of Energy/Nevada Operations Office Waste Management Division and conforms to the requirements contained in the ''Life Cycle Asset Management,'' U.S. Department of Energy Order O430.1A; the Joint Program Office Policy on Project Management in Support of DOE Order O430.1, and the Project Execution and Engineering Management Planning Guide. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the state of Nevada; and traditional project management philosophies such as the development of life cycle costs, schedules, and work scope; identification of roles and responsibilities; and baseline management and controls

  19. Atmospheric release advisory capability pilot project at two nuclear power plants and associated state offices of emergency preparedness. Final report

    International Nuclear Information System (INIS)

    Rosen, L.C.

    1983-01-01

    A project to demonstrate the feasibility of utilizing Atmospheric Release Advisory Capability (ARAC) limited service with commercial nuclear power plants and their associated state offices of emergency preparedness is discussed. Preliminary planning, installation and testing of the ARAC site facilities at Indian Point Nucler Power Station, New York State; at New York State Office of Emergency Preparedness, Albany, New York; at Rancho Seco Nuclear Generating Station, California; and at the State of California Office of Emergency Services, Sacramento, California, are summarized. ARAC participation in the Robert E. Ginna nuclear generating plant accident in New York on January 25, 1982, is discussed. The ARAC system is evaluated with emphasis on communications, the suite of models contained within the ARAC system, and the staff. The implications of this project in designing the next-generation ARAC system to service federal and state needs are assessed

  20. Organizational Considerations for Implementing Systems Engineering and Integration in the Ares Projects Office

    Science.gov (United States)

    Thomas, LeAnn; Doreswamy, Rajiv N.

    2008-01-01

    Systems Engineering and Integration (SE&I) is a critical discipline in developing new space systems. In 2005, NASA performed an internal study of 24 agency and Department of Defense (DoD) programs to evaluate methods of integrating SE&I practices and determine their effectiveness. The goal of the study was to determine the best SE&I implementation strategy for the Ares Projects Office. The study identified six SE&I organizational structures: 1. Lead systems integrator (LSI) with SE&I responsibility and government technical insight. 2a. Integration contractor with government SE&I responsibility (government insight). 2b. Integration contractor with government SE&I responsibility (government oversight). 3a. Prime contractor with SE&I responsibility (government insight). 3b. Prime contractor with SE&I responsibility (government oversight). 3c. Prime contractor with SE&I responsibility (government/industry partnership). 4a.Prime contractor with government SE&I responsibility (government insight). 4b. Prime contractor with government SE&I responsibility (government oversight). 4d.Prime contractors with total system performance responsibility (TSPR). 5. Prime contractor with government SE&I responsibility and integration products through a Federally Funded Research and Development Center (FFRDC). 6. Government/FFRDC in-house development with SE&I responsibility and function. The organizational structure used most often was number 4, using a prime contractor with government SE&I responsibility and government technical insight. However, data analyses did not establish a positive relationship between program development costs and specific SE&I organizational types, nor did it positively determine the relationship between successful programs or projects and their SE&I structure. The SE&I study reached the following conclusions: (1) Large, long-duration, technically complex programs or projects reach their technical goals, but rarely meet schedule or cost goals. NASA's recent

  1. Dark Skies Africa: a Prototype Project with the IAU Office of Astronomy for Development

    Science.gov (United States)

    Walker, Constance Elaine; Tellez, Daniel; Pompea, Stephen M.

    2015-08-01

    The IAU’s Office of Astronomy for Development (OAD) awarded the National Optical Astronomy Observatory (NOAO) with a grant to deliver a “Dark Skies Outreach to Sub-Saharan Africa” program to institutions in 12 African countries during 2013: Algeria, Nigeria, Rwanda, Tanzania, Ghana, Zambia, South Africa, Ethiopia, Gabon, Kenya, Namibia and Senegal. The program helped students identify wasteful and inefficient lighting and provided ways to reduce consumption and to keep energy costs in check. The goal was to inspire students to be responsible stewards in helping their community safeguard one of Africa’s natural resources - a dark night sky.Thirteen kits made by the NOAO Education and Public Outreach group were sent to coordinators at university, science center and planetarium-type institutions in the 12 countries and to the IAU OAD. The program’s kit included complete instructional guides and supplies for six hands-on activities (e.g., on the importance of shielding lights and using energy efficient bulbs) and a project on energy conservation and responsible lighting (through energy audits). The activities were taught to the coordinators in a series of six Google+ Hangout sessions scheduled from June to mid-November. The coordinators at the institutions in turn trained local teachers in junior and senior high schools. The Google+ Hangout sessions also included instruction on carrying out evaluations. From the end of November until mid-December students from the different African countries shared final class projects (such as posters or powerpoints) on the program’s website.The entire program was designed to help coordinators and educators work with students, parents and the community to identify dark sky resource, lighting and energy issues and to assess their status, efficiency and effectiveness. The audience will take away from the presentation lessons learned on how well the techniques succeeded in using Google+ Hangout sessions to instruct and

  2. Bibliography of studies for the Salt Repository Project Office of the Civilian Radioactive Waste Management Program, April 1978-May 1986

    International Nuclear Information System (INIS)

    1986-10-01

    DOE/CH/10140-05 is an annotated bibliography of approved reports that have been produced for the US Department of Energy Salt Repository Project Office of the Civilian Radioactive Waste Management Program since April 1978. This document is intended for use by the US Department of Energy, State and local officials, the US Nuclear Regulatory Commission, contractors to the Office of Nuclear Waste Isolation, concerned citizens, and others who need a comprehensive listing of reports related to a nuclear waste repository in salt. This document consists of a main report listing, appendixes with Work Breakdown Structure lists, and a topical index

  3. Bibliography of studies for the Salt Repository Project Office of the Civilian Radioactive Waste Management Program, April 1978-December 1986

    International Nuclear Information System (INIS)

    1987-06-01

    This document is an annotated bibliography of approved reports that have been produced for the US Department of Energy Salt Repository Project Office of the Civilian Radioactive Waste Management Program since April 1978. This document is intended for use by the US Department of Energy, State and local officials, the US Nuclear Regulatory Commission, contractors to the Office of Nuclear Waste Isolation, concerned citizens, and others who need a comprehensive listing of reports related to a nuclear waste repository in salt. This document consists of a main report listing, appendixes with Work Breakdown Structure lists, and a topical index

  4. Sir Ronald A. Fisher and the International Biometric Society.

    Science.gov (United States)

    Billard, Lynne

    2014-06-01

    The year 2012 marks the 50th anniversary of the death of Sir Ronald A. Fisher, one of the two Fathers of Statistics and a Founder of the International Biometric Society (the "Society"). To celebrate the extraordinary genius of Fisher and the far-sighted vision of Fisher and Chester Bliss in organizing and promoting the formation of the Society, this article looks at the origins and growth of the Society, some of the key players and events, and especially the roles played by Fisher himself as the First President. A fresh look at Fisher, the man rather than the scientific genius is also presented. © 2014, The International Biometric Society.

  5. Astronaut Ronald Evans photographed during transearth coast EVA

    Science.gov (United States)

    1972-01-01

    Astronaut Ronald E. Evans is photographed performing extravehicular activity (EVA) during the Apollo 17 spacecraft's transearth coast. During his EVA Command Module pilot Evans retrieved film cassettes from the Lunar Sounder, Mapping Camera, and Panoramic Camera. The total time for the transearth EVA was one hour seven minutes 19 seconds, starting at ground elapsed time of 257:25 (2:28 p.m.) amd ending at ground elapsed time of 258:42 (3:35 p.m.) on Sunday, December 17, 1972.

  6. Agile working as a key for diversity: the Siemens office project

    OpenAIRE

    S. Cuomo; A. Mapelli

    2014-01-01

    Following directives from corporate headquarters in 2011, the Real Estate Division of Siemens Italia faced the challenge of implementing significant changes in work organisation, which arose from the need to consolidate all the Milan-based offices into a single location; a Green Building, characterised by a reduction of the available floor space, compared to the sum of the local offices. However, this reorganisation was perceived as stimulus to think of this change, not only in relation to sp...

  7. Best in Class Project Management and Contract Management Initiative at the Department of Energy's Office of Environmental Management

    International Nuclear Information System (INIS)

    Van Camp, S.G.; Stevenson, J.S.; Deiters, M.G.

    2009-01-01

    Since its founding in 1989, the U.S. Department of Energy (DOE), Office of Environmental Management (EM) has struggled with a legacy of inadequate project and contract management. This has been manifested in recurring scope changes, cost overruns and schedule delays, and has been documented in multiple internal and external reviews. To address this issue, EM has developed a vision for building a 'Best in Class' Project Management and Contract Management (BICPM) organization. To develop the strategy and implement the process to accomplish this vision, EM contracted with the U.S. Army Corps of Engineers (USACE) and their support contractors. EM and the USACE Team developed a five-phased approach to implement the BICPM Initiative: (I) develop assessment criteria, (II) assess existing project and contract management capabilities, (III) develop an implementation plan, (IV) implement corrective actions, and (V) institutionalize BICPM. Under Phases I and II, the USACE Team assessed the status of project and contract management capabilities at 16 EM offices. These assessments evaluated strengths and weaknesses in 12 key project management capabilities and benchmarks and three contract management benchmarks. Under Phase III, EM and the USACE Team developed the Corporate Implementation Plan which identified the key challenges and provided a road-map to address these challenges and to implement BICPM. These challenges included: Federal staffing shortages; integration of project and contract management; further development of project-oriented culture; project baseline maintenance; consistent implementation of the DOE order for project management, 413.3A; and role of EM Headquarters in BICPM. The shortage of qualified resources dedicated to supporting Federal project and contract management functions was identified as a primary cause for project and contract management difficulties within EM. The Corporate Implementation Plan outlined a set of 18 specific Recommended Priority

  8. Ronald E. McNair Graduate Student Researchers Program

    Science.gov (United States)

    Monroe, Joseph

    2002-01-01

    According to the latest report by the National Science Foundation, only eighty-three (83) African-Americans received doctoral degrees in all engineering disciplines in 2000. North Carolina A&T State University (NC A&T) awarded Ph.D.s to 15 African-Americans, in only two engineering disciplines over the past 4 years. It clearly indicates that the partnership between NASA and NC A&T plays a significant role in producing minority engineering Ph.D.s, which this country needs to establish an ethnically diverse workforce to compete in a global economy. Many of these students would not have been able to study for their doctoral degrees without the Ronald E. McNair Graduate Research Fellowship Program.

  9. STS-76 Payload Cmdr Ronald Sega suits up

    Science.gov (United States)

    1996-01-01

    STS-76 Payload Commander Ronald M. Sega is donning his launch/entry suit in the Operations and Checkout Building with assistance from a suit technician. The third docking between the Russian Space Station Mir and the U.S. Space Shuttle marks the second trip into space for Sega, who recently served a five-month assignment in Russia as operations director for NASA activities there. Once suitup activities are completed the six-member STS-76 flight crew will depart for Launch Pad 39B, where the Space Shuttle Atlantis is undergoing final preparations for liftoff during an approximately seven-minute launch window opening around 3:13 a.m. EST, March 22.

  10. NASA Graduate Student Researchers Program Ronald E. McNair PhD Program

    Science.gov (United States)

    Howard, Sunnie

    1998-01-01

    The NASA Ronald E. McNair PHD Program was funded in September 1995. Implementation began during the spring of 1996. The deferment of the actual program initial semester enabled the program to continue support through the fall semester of 1998. This was accomplished by a no-cost extension from August 15, 1998 through December 31, 1998. There were 12 fellows supported by the program in 1996, 15 fellows in 1997, and 15 fellows 1998. Current program capacity is 15 fellows per funding support. Support for the academic outreach component began in spring 1998. The program was named the "Good Enough" Crew Activity (GECA) in honor of Dr. McNair's philosophy of everyone being good enough to achieve anything they want bad enough. The program currently enrolls 65 students from the third through the eight grades. The program is held 12 Saturdays per semester. The time is 9:00 AM to 12:30 PM each Saturday Morning. Program direction and facilitation is jointly administered with the PHD fellows and the Saturday Academy staff. Dr. John Kelly, REM-PHD Principal Investigator serves in a program oversight and leadership capacity. Ms. Sunnie Howard, The NASA REM-PHD Administrative Coordinator serves in an administrative and logistical capacity. Mr. Aaron Hatch, the NASA-AMES Liaison Officer, serve@'in a consultative and curriculum review capacity. The first recognition activity will be held on December 12, 1998, with the students, parents, faculty, PHD fellows, and other local student support services persons. Program outreach efforts are jointly supported by the NASA REM-PHD Program and the National Space Grant College and Fellowship Program. The Ph.D. program reached its first milestone in May 1998. North Carolina A&T State University graduated the first Ph.D. fellows. The first three Ph.D. Alumni were Ronald E. McNair PHD Program Fellows. It is hoped that this is just the beginning of a highly acclaimed doctoral program. The ultimate program success will be recognized when the

  11. Contributing to Tumor Molecular Characterization Projects with a Global Impact | Office of Cancer Genomics

    Science.gov (United States)

    My name is Nicholas Griner and I am the Scientific Program Manager for the Cancer Genome Characterization Initiative (CGCI) in the Office of Cancer Genomics (OCG). Until recently, I spent most of my scientific career working in a cancer research laboratory. In my postdoctoral training, my research focused on identifying novel pathways that contribute to both prostate and breast cancers and studying proteins within these pathways that may be targeted with cancer drugs.

  12. Research in progress: FY 1984. Summaries of projects sponsored by the Office of Health and Environmental Research

    International Nuclear Information System (INIS)

    1983-12-01

    This report provides a compilation of summaries of the research projects supported by the Office of Health and Environmental Research (OHER) during Fiscal Year 1984. OHER is a component of the Office of Energy Research within the US Department of Energy, responsible for developing a comprehensive understanding of the health and environmental effects of energy technology development and use as well as other Departmental operations. The OHER program is broad in scope and diverse in character with substantial commitments to both applied and basic research. The research projects have been organized to reflect the major themes and focus of the OHER program. Each research category is preceeded by a short narrative to provide some perspective of the scope of activities which follow. Within each research category, the summaries are organized by efforts performed in DOE laboratories (onsite laboratories) and those performed elsewhere (offsite contractors) to help characterize their respective role in the program. The compilation of project titles and summaries, despite its volume, is still a relatively superficial source of information. It does not provide a sound basis for considering program quality or even relevance

  13. Final report of the decontamination and decommissioning of the exterior land areas at the Grand Junction Projects Office facility

    Energy Technology Data Exchange (ETDEWEB)

    Widdop, M.R.

    1995-09-01

    The US Department of Energy (DOE) Grand Junction Projects Office (GJPO) facility occupies approximately 56.4 acres (22.8 hectares) along the Gunnison River near Grand Junction, Colorado. The site was contaminated with uranium ore and mill tailings during uranium-refining activities conducted by the Manhattan Engineer District and during pilot-milling experiments conducted for the US Atomic Energy Commission`s (AEC`s) domestic uranium procurement program. The GJPO facility was the collection and assay point for AEC uranium and vanadium oxide purchases until the early 1970s. The DOE Decontamination and Decommissioning Program sponsored the Grand Junction Projects Office Remedial Action Project (GJPORAP) to remediate the facility lands, site improvements, and the underlying aquifer. The site contractor, Rust Geotech, was the Remedial Action Contractor for GJPORAP. The exterior land areas of the facility assessed as contaminated have been remediated in accordance with identified standards and can be released for unrestricted use. Restoration of the aquifer will be accomplished through the natural flushing action of the aquifer during the next 50 to 80 years. The remediation of the DOE-GJPO facility buildings is ongoing and will be described in a separate report.

  14. Final report of the decontamination and decommissioning of Building 44 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial action contractor. Building 44 was radiologically contaminated and the building was demolished in 1994. The soil area within the footprint of the building was not contaminated; it complies with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building

  15. Final report of the decontamination and decommissioning of Building 34 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, was also the remedial action contractor. Building 34 was radiologically contaminated and the building was demolished in 1996. The soil area within the footprint of the building was analyzed and found to be not contaminated. The area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual closeout report for each contaminated GJPO building

  16. U.S. Department of Energy Grand Junction Projects Office site environmental report for calendar year 1995

    International Nuclear Information System (INIS)

    1996-05-01

    This report presents information pertaining to environmental activities conducted during calendar year 1995 at the US Department of Energy (DOE) Grand Junction Projects Office (GJPO) facility in Grand Junction, Colorado. Environmental activities conducted at the GJPO facility during 1995 were associated with mixed-waste treatment, site remediation, off-site dose modeling, and radiological and nonradiological monitoring. As part of the GJPO Mixed-Waste Treatment Program, on-site treatability studies were conducted in 1995 that made use of pilot-scale evaporative-oxidation and thermal-desorption units and bench-scale stabilization. DOE-GJPO used some of its own mixed-waste as well as samples received from other DOE sites for these treatability studies. These studies are expected to conclude in 1996. Removal of radiologically contaminated materials from GJPO facility buildings was conducted under the provisions of the Grand Junction Projects Office Remedial Action Project. Remediation activities included the removal of 394 metric tons of contaminated material from Buildings 18 and 28 and revegetation activities on the GJPO site; remediation was conducted in compliance with applicable permits

  17. Documenting cost and performance for environmental remediation projects: Department of Energy Office of Environmental Management

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-08

    The purpose of this DOE guide is to facilitate the use of consistent procedures to document cost and performance information for projects involving the remediation of media contaminated with hazardous and radioactive wastes. It provides remedial action project managers with a standardized set of data to document completed remediation projects. Standardized reporting of data will broaden the utility of the information, increase confidence in the effectiveness of future remedial technologies, and enhance the organization, storage and retrieval of relevant information for future cleanup projects. The foundation for this guide was laid down by the Federal Remediation Technologies Roundtable (FRTR) in their publication, Guide to Documenting Cost and Performance for Remediation Projects, EPA-542-B- 95-002. Member agencies of the FRTR include the US EPA, the US DOD, the US DOE, and the US DOI. All the member agencies are involved in site remediation projects and anticipate following the guidance provided in the above reference. Therefore, there is much to be gained for DOE to be consistent with the other member agencies as it will be easier to compare projects across different agencies and also to learn from the experiences of a wider spectrum of prior completed projects.

  18. Tribal Grant Program Area Polygons with Project Officer and Tribal Contact Information, US EPA Region 9, 2015, Regional Tribal Operations Committee

    Data.gov (United States)

    U.S. Environmental Protection Agency — This dataset contains information pertaining to EPA Region 9 project officers and their areas of oversight, EPA Region 9 grant program recipients and grant types,...

  19. Report: Results of Technical Network Vulnerability Assessment: EPA’s Ronald Reagan Building

    Science.gov (United States)

    Report #10-P-0212, September 7, 2010. Vulnerability testing of EPA’s Ronald Reagan Building network conducted in June 2010 identified Internet Protocol addresses with numerous high-risk and medium-risk vulnerabilities.

  20. Astronaut Ronald Sega with Wake Shield Facility on test stand at JSC

    Science.gov (United States)

    1991-01-01

    The Wake Shield Facility is displayed on a test stand at JSC. Astronaut Ronald M. Sega, mission specialist for STS-60, is seen with the facility during a break in testing in the acoustic and vibration facility at JSC.

  1. Linux toys II 9 Cool New Projects for Home, Office, and Entertainment

    CERN Document Server

    Negus, Christopher

    2006-01-01

    Builds on the success of the original Linux Toys (0-7645-2508-5) and adds projects using different Linux distributionsAll-new toys in this edition include a car computer system with built-in entertainment and navigation features, bootable movies, a home surveillance monitor, a LEGO Mindstorms robot, and a weather mapping stationIntroduces small business opportunities with an Internet radio station and Internet caf ̌projectsCompanion Web site features specialized hardware drivers, software interfaces, music and game software, project descriptions, and discussion forumsIncludes a CD-ROM with scr

  2. EPA Office of Water (OW): Nonpoint Source Projects NHDPlus Indexed Dataset

    Data.gov (United States)

    U.S. Environmental Protection Agency — GRTS locational data for nonpoint source projects. GRTS locations are coded onto NHDPlus v2.1 flowline features to create point and line events or coded onto NHDPlus...

  3. Dr. David Brown poses with a portrait of Ronald McNair

    Science.gov (United States)

    1999-01-01

    In the gymnasium of Ronald McNair Magnet School in Cocoa, Fla., Dr. David Brown, a NASA astronaut, poses with a portrait of NASA astronaut Ronald McNair. The portrait was presented to the school by Walt Disney World during a tribute to McNair. The school had previously been renamed for the fallen astronaut who was one of a crew of seven who lost their lives during an accident following launch of the Space Shuttle Challenger in January 1986.

  4. Mickey Mouse poses with a portrait of Ronald McNair

    Science.gov (United States)

    1999-01-01

    In the gymnasium of Ronald McNair Magnet School in Cocoa, Fla., Mickey Mouse poses with a portrait of NASA astronaut Ronald McNair. The portrait was presented to the school by Walt Disney World during a tribute to McNair. The school had previously been renamed for the fallen astronaut who was one of a crew of seven who lost their lives during an accident following launch of the Space Shuttle Challenger in January 1986.

  5. Final report of the decontamination and decommissioning of Building 1 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 1 was found to be radiologically contaminated and was demolished in 1996. The soil beneath and adjacent to the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building

  6. 18 CFR 375.308 - Delegations to the Director of the Office of Energy Projects.

    Science.gov (United States)

    2010-04-01

    ... the Federal Power Act, where no substantive changes in ownership, corporate structure or domicile, or... government dams or other structures billed to licensees each year for contractual payments for the... resources projects submitted by other agencies of the Federal government for Commission review or comment...

  7. The lazy project manager how to be twice as productive and still leave the office early

    CERN Document Server

    Taylor, Peter

    2009-01-01

    Peter Taylor reveals how adopting a more focused approach to life, projects and work can make you twice as productive. The lazy project manager illustrates how anyone can apply the simple techniques of lazy project management in their own activities in order to work more effectively and consequently improve work-life balance. This 'productive laziness' approach builds on the Pareto principle that states that for many phenomena, 80 per cent of consequences stem from 20 per cent of the causes. To put it simply, only 20 per cent of the things people do during their working days really matter. Inside this insightful and informative book you'll discover: * The intelligence of laziness - why smart, lazy people have the edge over others; * Why the Jungle Book's 'Bare Necessities' should be the productive lazy theme tune; * How to get the maximum output for a minimised input; * Quick tips to productive lazy heaven. Everyone wants to achieve more without chaining themselves to their desk. By concentrating your project...

  8. The life and contribution of Dr. Ronald Gitelman: a pioneer of modern chiropractic science.

    Science.gov (United States)

    Vernon, Howard

    2013-03-01

    The life and contribution to chiropractic science of Dr. Ronald Gitelman is reviewed. Sources for this article included review of the notes prepared by Dr. Joseph Keating in his "biography" of the Canadian Memorial Chiropractic College (CMCC); review of the important articles published by Dr. Gitelman; review of the important projects undertaken by him along with various colleagues; notes from reminiscences obtained from many of these colleagues and discussions with his family. Dr. Gitelman's academic career spanned from 1963 to the late 1980's. During that time, he made foundational contributions to the development of chiropractic science including: developing the Archives (1974), the first collection of scientific articles supporting chiropractic science (which was subsequently published as the Chiropractic Archives Research Collection (CRAC)); delivering one of the few chiropractic papers at the seminal NINCDS conference (1975) and, developing the collaboration between CMCC and Dr. Kirkaldy-Willis at the University of Saskatoon (1976). He practiced in Toronto from 1961 to 2007. Dr. Gitelman was a pioneer in the development of chiropractic science. He died on October 7, 2012.

  9. Reducing Plug Loads in Office Spaces: Hawaii and Guam Energy Improvement Technology Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Sheppy, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Metzger, I. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Cutler, D. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Holland, G. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Hanada, A. [Naval Facilities Engineering Command, Washington, DC (United States)

    2014-01-01

    As part of its overall strategy to meet its energy goals, the Naval Facilities Engineering Command (NAVFAC) partnered with the Department of Energy's National Renewable Energy Laboratory (NREL) to rapidly demonstrate and deploy cost-effective renewable energy and energy efficiency technologies. This project was one of several demonstrations of new or underutilized commercial energy technologies. The common goal was to demonstrate and measure the performance and economic benefit of the system while monitoring any ancillary impacts to related standards of service and operation and maintenance (O&M) practices. In short, demonstrations at naval facilities simultaneously evaluate the benefits and compatibility of the technology with the U.S. Department of Defense (DOD) mission, and with NAVFAC's design, construction, operations, and maintenance practices, in particular. This project demonstrated the performance of commercially available advanced power strips (APSs) for plug load energy reductions in building A4 at Joint Base Pearl Harbor-Hickam (JBPHH), Hawaii.

  10. Front-office staff can improve clinical tobacco intervention: health coordinator pilot project.

    Science.gov (United States)

    Bass, Frederic; Naish, Brigham; Buwembo, Isaac

    2013-11-01

    To learn whether front-line personnel in primary care practices can increase delivery of clinical tobacco interventions and also help smokers address physical inactivity, at-risk alcohol use, and depression. Uncontrolled before-and-after design. Vancouver, BC, area (4 practices); northern British Columbia (2 practices). Six practices, with 1 staff person per practice serving as a "health coordinator" who tracked and, after the baseline period, delivered preventive interventions to all patients who smoked. To assess delivery of preventive interventions, each practice was to sample 300 consecutive patient records, both at baseline and at follow-up 15 months later. Front-office staff were recruited, trained, paid, and given ongoing support to provide preventive care. Clinicians supplemented this care with advice and guided the use of medication. Effectiveness of the intervention was based on comparison, at baseline and at follow-up, of the proportion of patients with any of the following 6 proven intervention components documented in their medical records: chart reminder, advice received, self-management plan, target quit date, referral, and follow-up date (as they applied to tobacco, physical inactivity, at-risk alcohol use, and depression). A Tobacco Intervention Flow Sheet cued preventive care, and its data were entered into a spreadsheet (which served as a smokers' registry). Qualitative appraisal data were noted. For tobacco, substantial increases occurred after the intervention period in the proportion of patients with each of the intervention components noted in their charts: chart reminder (20% vs 94%); provision of advice (34% vs 79%); self-management plan (14% vs 57%); target quit date (5% vs 11%); referral (6% vs 11%); and follow-up date (7% vs 42%). Interventions for physical inactivity and depression showed some gains, but there were no gains for at-risk alcohol use. Front-line staff, patients, and clinicians were enthusiastic about the services offered

  11. Partial support for the International Global Atmospheric Chemistry Core Project Office

    Energy Technology Data Exchange (ETDEWEB)

    Prinn, Ronald G.

    2001-05-04

    IGAC provides an international framework for the planning, coordination, and execution of atmospheric--biospheric research with emphasis on projects which require resources beyond the capabilities of any single nation. The development of chemical emission inventories by IGAC scientists, the development and intercomparison under IGAC leadership of existing chemical transport models, the analysis of data gathered during IGAC-sponsored field campaigns, etc., has provided new scientific information essential to the development of the discipline.

  12. Station, local, and public participation plan, Salt Repository Project Office, Deaf Smith County, Texas: Draft

    International Nuclear Information System (INIS)

    1987-12-01

    The purpose of the SRPO State, Local, and Public Participation Plan is to provide an ''umbrella'' document for the ongoing and planned institutional involvement. One of the major goals is to develop project-specific outreach and participation programs based on input received from interested parties. DOE's commitment to interaction and information programs is to be demonstrated by conducting activities in an open environment, listening to and understanding the concerns of interested parties, actively involving affected parties in the program, executing faithfully the intent of Congress expressed through the NWPA, and providing equitable treatment for all affected parties. 1 fig., 2 tabs

  13. Environmental assessment of facility operations at the U.S. Department of Energy Grand Junction Projects Office, Grand Junction, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The US Department of Energy (DOE) has prepared a sitewide environmental assessment (EA) of the proposed action to continue and expand present-day activities on the DOE Grand Junction Projects Office (GJPO) facility in Grand Junction, Colorado. Because DOE-GJPO regularly proposes and conducts many different on-site activities, DOE decided to evaluate these activities in one sitewide EA rather than in multiple, activity-specific documents. On the basis of the information and analyses presented in the EA, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined by the National Environmental Policy Act (NEPA) of 1969. Therefore, preparation of an environmental impact statement is not required for facility operations, and DOE is issuing this Finding of No Significant Impact (FONSI).

  14. Environmental assessment of facility operations at the U.S. Department of Energy Grand Junction Projects Office, Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1996-06-01

    The US Department of Energy (DOE) has prepared a sitewide environmental assessment (EA) of the proposed action to continue and expand present-day activities on the DOE Grand Junction Projects Office (GJPO) facility in Grand Junction, Colorado. Because DOE-GJPO regularly proposes and conducts many different on-site activities, DOE decided to evaluate these activities in one sitewide EA rather than in multiple, activity-specific documents. On the basis of the information and analyses presented in the EA, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined by the National Environmental Policy Act (NEPA) of 1969. Therefore, preparation of an environmental impact statement is not required for facility operations, and DOE is issuing this Finding of No Significant Impact (FONSI)

  15. The Challenges of Integrating NASA's Human, Budget, and Data Capital within the Constellation Program's Exploration Launch Projects Office

    Science.gov (United States)

    Kidd, Luanne; Morris, Kenneth B.; Self, Tim

    2006-01-01

    The U.S. Vision for Space Exploration directs NASA to retire the Space Shuttle in 2010 and replace it with safe, reliable, and cost-effective space transportation systems for crew and cargo travel to the Moon, Mars, and beyond. Such emerging space transportation initiatives face massive organizational challenges, including building and nurturing an experienced, dedicated team with the right skills for the required tasks; allocating and tracking the fiscal capital invested in achieving technical progress against an integrated master schedule; and turning generated data into usehl knowledge that equips the team to design and develop superior products for customers and stakeholders. This paper discusses how NASA's Exploration Launch Projects Office, which is responsible for delivering these new launch vehicles, integrates these resources to create an engineering business environment that promotes mission success.

  16. [Psychiatric patients and relatives instruct German police officers - an anti-stigma project of "BASTA - the alliance for mentally ill people"].

    Science.gov (United States)

    Wundsam, Kerstin; Pitschel-Walz, Gabi; Leucht, Stefan; Kissling, Werner

    2007-05-01

    Contact with police officers due to schizophrenia and resort to violence in such interactions is a common occurrence and represents a source for stigmatisation of mentally ill people. Aim of this project was to establish a program for police officers to reduce that stigma. The seminar was developed by a German anti-stigma organisation in cooperation with sociology teachers of the Bavarian police academy. Evaluations focussed on the police officers "social distance" and "negative stereotypes" towards mentally ill people. The personal contact between officers and the referees (patients, relatives, professionals) was the core of the seminar. Results of a debriefing after the pilot-project was overall positive. Evaluations in the renewal years showed significant improvement within the scale "social distance" (p stigma interventions.

  17. Acceptability of the Urban Family Medicine Project among Physicians: A Cross-Sectional Study of Medical Offices, Iran.

    Science.gov (United States)

    Kor, Elham Movahed; Rashidian, Arash; Hosseini, Mostafa; Azar, Farbod Ebadi Fard; Arab, Mohammad

    2016-10-01

    It is essential to organize private physicians in urban areas by developing urban family medicine in Iran. Acceptance of this project is currently low among physicians. The present research determined the factors affecting acceptability of the Urban Family Medicine Project among physicians working in the private sector of Mazandaran and Fars provinces in Iran. This descriptive-analytical and cross-sectional study was conducted in Mazandaran and Fars provinces. The target population was all physicians working in private offices in these regions. The sample size was calculated to be 860. The instrument contained 70 items that were modified in accordance with feedback from eight healthcare managers and a pilot sample of 50 physicians. Data was analyzed using the LISREL 8.80. The response rate was 82.21% and acceptability was almost 50% for all domains. The fit indices of the structural model were the chi-square to degree-of-freedom (2.79), normalized fit index (0.98), non-normalized fit index (0.99), comparative fit index (0.99), and root mean square error of approximation (0.05). Training facilities had no significant direct effect on acceptability; however, workload had a direct negative effect on acceptability. Other factors had direct positive effects on acceptability. Specification of the factors relating to acceptance of the project among private physicians is required to develop the project in urban areas. It is essential to upgrade the payment system, remedy cultural barriers, decrease the workload, improve the scope of practice and working conditions, and improve collaboration between healthcare professionals.

  18. Final report of the decontamination and decommissioning of Building 39 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission's domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial action contractor. The soil beneath Building 39 was radiologically contaminated and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building

  19. Final report of the decontamination and decommission of Building 31 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    Krabacher, J.E.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Radiological contamination was identified in Building 31 and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This area was addressed in the summary final report of the remediation of the exterior areas of the GJPO facility. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building

  20. Final report of the decontamination and decommissioning of Building 6 at the Grand Junction Projects Office Facility

    International Nuclear Information System (INIS)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial action contractor. Radiological contamination was identified in Building 6, and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building

  1. Dr. David Brown poses with students at Ronald McNair Middle School

    Science.gov (United States)

    1999-01-01

    Dr. David Brown (right), a NASA astronaut, poses with students in the gymnasium of Ronald McNair Magnet School in Cocoa, Fla. From left, the students are Kristin Rexford, Danitra Anderson, Dominique Smith, Fallon Davis, and Qiana Taylor. Brown was at the school to attend a tribute to NASA astronaut Ronald McNair. The school had previously been renamed for the fallen astronaut who was one of a crew of seven, who lost their lives during an accident following launch of the Space Shuttle Challenger in January 1986.

  2. Ms. Rodriquez and Mickey Mouse pose with a portrait of Ronald McNair

    Science.gov (United States)

    1999-01-01

    In the gymnasium of Ronald McNair Magnet School in Cocoa, Fla., Ms. Maria Rodriguez, an Walt Disney World Ambassador, and Mickey Mouse pose with a portrait of NASA astronaut Ronald McNair. The portrait was presented to the school by Walt Disney World during a tribute to McNair. The school had previously been renamed for the fallen astronaut, who was one of a crew of seven who lost their lives during an accident following launch of the Space Shuttle Challenger in January 1986.

  3. Nye County Nuclear Waste Repository Project Office independent scientific investigations program annual report, May 1997 - April 1998

    International Nuclear Information System (INIS)

    1998-07-01

    This annual summary report, prepared by the Nye County Nuclear Waste Repository Project Office (NWRPO), summarizes the activities that were performed during the period from May 1, 1997 to April 30, 1998. These activities were conducted in support of the Independent Scientific Investigation Program (ISIP) of Nye County at the Yucca Mountain Site (YMS). The Nye County NWRPO is responsible for protecting the health and safety of the Nye County residents. NWRPO's on-site representative is responsible for designing and implementing the Independent Scientific Investigation Program (ISIP). Major objectives of the ISIP include: Investigating key issues related to conceptual design and performance of the repository that can have major impact on human health, safety, and the environment; identifying areas not being addressed adequately by the Department of Energy (DOE). Nye County has identified several key scientific issues of concern that may affect repository design and performance which were not being adequately addressed by DOE. Nye County has been conducting its own independent study to evaluate the significance of these issues. This report summarizes the results of monitoring from two boreholes and the Exploratory Studies Facility (ESF) tunnel that have been instrumented by Nye County since March and April of 1995. The preliminary data and interpretations presented in this report do not constitute and should not be considered as the official position of Nye County. The ISIP presently includes borehole and tunnel instrumentation, monitoring, data analysis, and numerical modeling activities to address the concerns of Nye County

  4. Nye County nuclear waste repository project office independent scientific investigations program. Summary annual report, May 1996--April 1997

    International Nuclear Information System (INIS)

    1997-05-01

    This annual summary report, prepared by Multimedia Environmental Technology, Inc. (MET) on behalf of Nye County Nuclear Waste Project Office, summarizes the activities that were performed during the period from May 1, 1996 to April 30, 1997. These activities were conducted in support of the Independent Scientific Investigation Program (ISIP) of Nye County at the Yucca Mountain Site (YMS). The Nye County NWRPO is responsible for protecting the health and safety of the Nye County residents. NWRPO's on-site representative is responsible for designing and implementing the Independent Scientific Investigation Program (ISIP). Major objectives of the ISIP include: (1) Investigating key issues related to conceptual design and performance of the repository that can have major impact on human health, safety, and the environment. (2) Identifying areas not being addressed adequately by DOE Nye County has identified several key scientific issues of concern that may affect repository design and performance which were not being adequately addressed by DOE. Nye County has been conducting its own independent study to evaluate the significance of these issues

  5. Nye County Nuclear Waste Repository Project Office independent scientific investigations program annual report, May 1997--April 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    This annual summary report, prepared by the Nye County Nuclear Waste Repository Project Office (NWRPO), summarizes the activities that were performed during the period from May 1, 1997 to April 30, 1998. These activities were conducted in support of the Independent Scientific Investigation Program (ISIP) of Nye County at the Yucca Mountain Site (YMS). The Nye County NWRPO is responsible for protecting the health and safety of the Nye County residents. NWRPO`s on-site representative is responsible for designing and implementing the Independent Scientific Investigation Program (ISIP). Major objectives of the ISIP include: Investigating key issues related to conceptual design and performance of the repository that can have major impact on human health, safety, and the environment; identifying areas not being addressed adequately by the Department of Energy (DOE). Nye County has identified several key scientific issues of concern that may affect repository design and performance which were not being adequately addressed by DOE. Nye County has been conducting its own independent study to evaluate the significance of these issues. This report summarizes the results of monitoring from two boreholes and the Exploratory Studies Facility (ESF) tunnel that have been instrumented by Nye County since March and April of 1995. The preliminary data and interpretations presented in this report do not constitute and should not be considered as the official position of Nye County. The ISIP presently includes borehole and tunnel instrumentation, monitoring, data analysis, and numerical modeling activities to address the concerns of Nye County.

  6. Office of the Chief Financial Officer Annual Report 2009

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez, Jeffrey

    2009-12-15

    Presented is the 2009 Chief Financial Officer's Annual Report. The data included in this report has been compiled from the Budget Office, the Controller, Procurement and Property Management and the Sponsored Projects Office.

  7. A View of War and Soldiering in the Carey Novels of Ronald Welch

    Science.gov (United States)

    Barnes, Clive

    2016-01-01

    Ronald Welch's novels featuring the military adventures of the young men of the Carey family were first published between 1954 and 1976 and have recently been reissued. They were uniquely representative of historical military adventure for children in the Britain of this period; and were the last example of a vigorous century-old genre in…

  8. Boekbespreking Ronald Meester en Joost Hulshof: Wiskunde in je vingers : Hogere wiskunde omlaaghalen

    NARCIS (Netherlands)

    Caspers, Wim; Timmer, Mark

    “Een oppepcursus voor liefhebbers en andere freaks”, zo omschrijven Ronald Meester en Joost Hulshof hun boek W={kunde} in je vingers. Wim Caspers en Mark Timmer, allebei docent aan een middelbare school en lerarenopleider, bekeken het boek ieder vanuit beide rollen en gingen op bezoek bij de

  9. NATO peab jääma oluliseks / Jamie Shea, Ronald Asmus ; interv. Erkki Bahovski

    Index Scriptorium Estoniae

    Shea, Jamie

    2006-01-01

    NATO peasekretäri poliitikaplaneerimise juht dr. Jamie Shea ja USA Saksa Marshalli Keskuse direktor dr. Ronald Asmus räägivad NATO uuendamise tähtsusest ja selleteemalise avaliku debati vajalikkusest. NATO Riia tippkohtumise ülesandest, Eesti uutest väljakutsetest NATO-s

  10. Modeling Chemistry for Effective Chemical Education: An Interview with Ronald J. Gillespie

    Science.gov (United States)

    Cardellini, Liberato

    2010-01-01

    Ronald J. Gillespie, the inventor of the Valence Shell Electron Pair Repulsion (VSEPR) model, relates how his career as researcher in Christopher Ingold's laboratories started. Gillespie developed a passion for chemistry and chemical education, searching for more appropriate and interesting ways to transmit the essential knowledge and enthusiasm…

  11. Ronald Malt or Chen Zhongwei: Who performed the first surgical replantation?

    Science.gov (United States)

    Fan, Ka-Wai

    2018-01-01

    This article discusses the contributions of the two pioneers of the surgical procedure of replantation-Ronald Malt in the US and Chen Zhongwei in China. Ronald Malt performed the reattachment surgery on a boy who had an accident in 1962, but he published his case report two years later in 1964. Chen Zhongwei performed a similar surgery on a worker who cut off his forearm in 1963, but he published his case report the same year. There is some debate about which one of these reputed surgeons should be given credit for being the first one to perform this breakthrough surgery, because although Malt was the first to perform the procedure, Zhongwei was the first to report it. To shed light on this controversy, criteria for scientific priority suggested by Ronald Vale and Anthony Hyman were applied. Although the criteria mainly favored Zhongwei as the pioneer of this procedure, he did not entirely fulfill one of the criteria. Therefore, the article could not present a definitive answer to the question, and it concludes by pointing out the highly commendable achievements and contributions of both Ronald Malt and Chen Zhongwei.

  12. Hayes Receives 2012 Ronald Greeley Early Career Award in Planetary Science: Citation

    Science.gov (United States)

    Leshin, Laurie A.

    2013-10-01

    Alexander G. Hayes Jr. received the 2012 Ronald Greeley Early Career Award in Planetary Science at the 2012 AGU Fall Meeting, held 3-7 December in San Francisco, Calif. The award recognizes significant early-career contributions to planetary science.

  13. STS-30 Pilot Ronald J. Grabe during preflight press conference at JSC

    Science.gov (United States)

    1989-01-01

    During preflight press conference, STS-30 Pilot Ronald J. Grabe answers a question from the news media. The event was held in the JSC Auditorium and Public Affairs Facility Bldg 2 briefing room. STS-30 mission will fly onboard Atlantis, Orbiter Vehicle (OV) 104, and is scheduled for an April 28 liftoff.

  14. Ronald William Hodges, 1934-2017: Eminent Lepidopterist and Great Mentor

    Science.gov (United States)

    Dr. Ronald William Hodges (1934-2017) was an eminent lepidopterist and former Research Leader of the Systematic Entomology Laboratory from 1976 to 1979. He published on 117 genera (21 new), 806 species (351 new), 36 subfamilies (7 new), and 16 families (7 new) about gelechioid micromoths. He was awa...

  15. Supercomplexity and the University: Ronald Barnett and the Social Philosophy of Higher Education

    Science.gov (United States)

    Bengtsen, Søren S. E.

    2018-01-01

    Ronald Barnett's modern classic "Realizing the University in an Age of Supercomplexity" (published December 1999), has had a crucial impact internationally on the field of Higher Education research and development since the book was published now nearly 20 years ago. Bridging an academic oeuvre across almost 30 years with close to 30…

  16. The Challenges of Integrating NASA's Human, Budget, and Data Capital within the Constellation Program's Exploration Launch Projects Office

    Science.gov (United States)

    Kidd, Luanne; Morris, Kenneth B.; Self, Timothy A.

    2007-01-01

    The U.S. Vision for Space Exploration directs NASA to retire the Space Shuttle in 2010 and replace it with safe, reliable, and cost-effective space transportation systems for crew and cargo travel to the Moon, Mars, and beyond. Such emerging space transportation initiatives face massive organizational challenges, including building and nurturing an experienced, dedicated team with the right skills for the required tasks; allocating and tracking the fiscal capital invested in achieving technical progress against an integrated master schedule; and turning generated data into useful knowledge that equips the team to design and develop superior products for customers and stakeholders. It has been more than 30 years since the Space Shuttle was designed; therefore, the current aerospace workforce has limited experience with developing new designs for human-rated spaceflight hardware. To accomplish these activities, NASA is using a wide range of state-of-the-art information technology tools that connect its diverse, decentralized teams and provide timely, accurate information for decision makers. In addition, business professionals are assisting technical managers with planning, tracking, and forecasting resource use against an integrated master schedule that horizontally and vertically interlinks hardware elements and milestone events. Furthermore, NASA is employing a wide variety of strategies to ensure that it has the motivated and qualified staff it needs for the tasks ahead. This paper discusses how NASA's Exploration Launch Projects Office, which is responsible for delivering these new launch vehicles, integrates its resources to create an engineering business environment that promotes mission success, which is defined by replacing the Space Shuttle by 2014 and returning to the Moon by 2020.

  17. Searching the Origins of Political Discourse – An Intertextual Analysis of Ronald Reagan’s Farewell Speech

    Directory of Open Access Journals (Sweden)

    Małgorzata Szudrowicz-Garstka

    2014-11-01

    Full Text Available The aim of the investigation is to present the relation between political and religious discourse on the basis of intertextual elements linking the two types of discourse. A presidential speech by Ronald Reagan, delivered in the Oval Office at the White House on January 11, 1983, constitutes the material for the research. The emphasis of the study is placed on the fragments referring to “the shining city upon the hill”, i.e. to the most frequently used metaphor by the president. The roots of the afore mentioned parts belong to religious discourse. They can be found primarily in a sermon by John Winthrop – one of the Puritans – who came to America in 1630. Nevertheless, it is not the sole source of references. While preparing his “Modell of Christian Charity”, John Winthrop referred to the Bible. Words considering “the city upon the hill” are to be found in the Gospel (Mt 5, 14. The analysed fragment of the “Sermon on the Mount”, i.e., “You are the light of the world. A city built on a hill cannot be hidden (…” deals with advice on the lifestyle of Jesus’s followers and obviously serves as an example of religious discourse as well.

  18. Rand Project AIR FORCE Annual Report 2010

    Science.gov (United States)

    2010-01-01

    LLC Michael Lynton, Chairman and Chief Executive Officer, Sony Pictures Entertainment Ronald L. Olson, Partner, Munger, Tolles & Olson LLP Paul H...management, and his Air Force career centered on research. Even a shared love of music finds them in different parts of the orchestra, with Ray as a

  19. Can an ethics officer role reduce delays in research ethics approval? A mixed-method evaluation of an improvement project

    Science.gov (United States)

    Dixon-Woods, Mary; Foy, Chris; Hayden, Charlotte; Al-Shahi Salman, Rustam; Tebbutt, Stephen; Schroter, Sara

    2016-01-01

    Objective Frustration continues to be directed at delays in gaining approvals for undertaking health research in the UK. We aimed to evaluate the impact of an ethics officer intervention on rates of favourable opinions (approval) and provisional opinions (requiring revision and resubmission) and on the time taken to reach a final opinion by research ethics committees (RECs), to characterise how the role operated in practice, and to investigate applicants' views. Design Mixed-method study involving (i) a 2-group, non-randomised before-and-after intervention study of RECs assigned an ethics officer and a matched comparator group; (ii) a process evaluation involving a survey of applicants and documentary analysis. Participants 6 RECs and 3 associated ethics officers; 18 comparator RECs; REC applicants. Results Rates of provisional and favourable opinions between ethics officer and comparator RECs did not show a statistically significant effect of the intervention (logistic regression, p=0.26 for favourable opinions and p=0.31 for provisional opinions). Mean time to reach a decision showed a non-significant reduction (ANOVA, p=0.22) from 33.3 to 32.0 days in the ethics officer RECs compared with the comparator RECs (32.6 to 32.9 days). The survey (30% response rate) indicated applicant satisfaction and also suggested that ethics officer support might be more useful before submission. Ethics officers were successful in identifying many issues with applications, but the intervention did not function exactly as designed: in 31% of applicants, no contact between the applicants and the ethics officer took place before REC review. Limitations This study was a non-randomised comparison cohort study. Some data were missing. Conclusions An ethics officer intervention, as designed and implemented in this study, did not increase the proportion of applications to RECs that were approved on first review and did not reduce the time to a committee decision. PMID:27580832

  20. Scotts Valley Energy Office and Human Capacity Building that will provide energy-efficiency services and develop sustainable renewable energy projects.

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, Temashio [Scotts Valley Band of Pomo Indians

    2013-06-28

    The primary goal of this project is to develop a Scotts Valley Energy Development Office (SVEDO). This office will further support the mission of the Tribe's existing leadership position as the DOE Tribal Multi-County Weatherization Energy Program (TMCWEP) in creating jobs and providing tribal homes and buildings with weatherization assistance to increase energy efficiency, occupant comfort and improved indoor air quality. This office will also spearhead efforts to move the Tribe towards its further strategic energy goals of implementing renewable energy systems through specific training, resource evaluation, feasibility planning, and implementation. Human capacity building and continuing operations are two key elements of the SVEDO objectives. Therefore, the project will 1) train and employ additional Tribal members in energy efficiency, conservation and renewable resource analyses and implementation; 2) purchase materials and equipment required to implement the strategic priorities as developed by the Scotts Valley Tribe which specifically include implementing energy conservation measures and alternative energy strategies to reduce energy costs for the Tribe and its members; and 3) obtain a dedicated office and storage space for ongoing SVEDO operations.

  1. Julgeolekuanalüütik : maailm on ohtlikum kui enne Iraagi sõda / Ronald D. Asmus ; interv. Erkki Bahovski

    Index Scriptorium Estoniae

    Asmus, Ronald D., 1957-2011

    2005-01-01

    Saksa Marshalli Fondi tegevdirektor Ameerika ja Euroopa suhetest, Euroopa Liidu poliitikast Venemaa suhtes, Eesti panusest Euroopa Liidu poliitika kujundamisesse, NATO 2006. aasta tippkohtumisest ja Ukraina võimalikust liitumisest NATO-ga. Lisa: Dr Ronald D. Asmus

  2. Ronald F. Levant: Award for Distinguished Professional Contributions to Applied Research.

    Science.gov (United States)

    2011-11-01

    Presents Ronald F. Levant as the 2011 winner of the American Psychological Association Award for Distinguished Professional Contributions to Applied Research. "Ronald F. Levant is one of the world's leading authorities on the psychology of men and masculinity. Through his pioneering research, he helped define gender role strain theory, fostered a multicultural understanding of fathering and masculinity issues, and developed and evaluated the Male Role Norms Inventory and the Normative Male Alexithymia Scale. He also established the empirical foundation for the normative male alexithymia hypothesis, which proposes that male socialization inhibits emotional expression in males, and he developed alexithymia reduction treatment, which is designed to prepare men to engage more fully in psychotherapy and to experience greater benefit from it." (PsycINFO Database Record (c) 2011 APA, all rights reserved). 2011 APA, all rights reserved

  3. A perspective on the contributions of Ronald C. Davidson to plasma physics

    Science.gov (United States)

    Wurtele, Jonathan S.

    2016-10-01

    Starting in the 1960s and continuing for half a century, Ronald C. Davidson made fundamental theoretical contributions to a wide range of areas of pure and applied plasma physics. Davidson was one of the founders of nonneutral plasma physics and a pioneer in developing and applying kinetic theory and nonlinear stability theorems to collective interaction processes and nonlinear dynamics of nonneutral plasmas and intense charged particle beams. His textbooks on nonneutral plasmas are the classic references for the field and educated generations of graduate students. Davidson was a strong advocate for applying the ideas of plasma theory to develop techniques that benefit other branches of science. For example, one of the major derivative fields enabled by nonneutral plasmas is the study of antimatter plasmas and the synthesis of antihydrogen. This talk will review a few highlights of Ronald Davidson's impact on plasma physics and related fields of science.

  4. Can an ethics officer role reduce delays in research ethics approval? A mixed-method evaluation of an improvement project.

    Science.gov (United States)

    Dixon-Woods, Mary; Foy, Chris; Hayden, Charlotte; Al-Shahi Salman, Rustam; Tebbutt, Stephen; Schroter, Sara

    2016-08-31

    Frustration continues to be directed at delays in gaining approvals for undertaking health research in the UK. We aimed to evaluate the impact of an ethics officer intervention on rates of favourable opinions (approval) and provisional opinions (requiring revision and resubmission) and on the time taken to reach a final opinion by research ethics committees (RECs), to characterise how the role operated in practice, and to investigate applicants' views. Mixed-method study involving (i) a 2-group, non-randomised before-and-after intervention study of RECs assigned an ethics officer and a matched comparator group; (ii) a process evaluation involving a survey of applicants and documentary analysis. 6 RECs and 3 associated ethics officers; 18 comparator RECs; REC applicants. Rates of provisional and favourable opinions between ethics officer and comparator RECs did not show a statistically significant effect of the intervention (logistic regression, p=0.26 for favourable opinions and p=0.31 for provisional opinions). Mean time to reach a decision showed a non-significant reduction (ANOVA, p=0.22) from 33.3 to 32.0 days in the ethics officer RECs compared with the comparator RECs (32.6 to 32.9 days). The survey (30% response rate) indicated applicant satisfaction and also suggested that ethics officer support might be more useful before submission. Ethics officers were successful in identifying many issues with applications, but the intervention did not function exactly as designed: in 31% of applicants, no contact between the applicants and the ethics officer took place before REC review. This study was a non-randomised comparison cohort study. Some data were missing. An ethics officer intervention, as designed and implemented in this study, did not increase the proportion of applications to RECs that were approved on first review and did not reduce the time to a committee decision. Published by the BMJ Publishing Group Limited. For permission to use (where not

  5. Inquiring into Appreciative Inquiry: A Conversation With David Cooperrider and Ronald Fry

    OpenAIRE

    Grieten, Styn; Lambrechts, Frank; Bouwen, René; Huybrechts, Jolien; Fry, Ronald; Cooperrider, David

    2018-01-01

    David Cooperrider and Ronald Fry are professors of Organizational Behavior at the Weatherhead School of Management, Case Western Reserve University. CWRU’s Department of Organizational Behavior is consistently acknowledged as one of the best in the world by the Financial Times. Together with their mentor, Suresh Srivastva, they created Appreciative Inquiry over 30 years ago. Since then, Appreciative Inquiry has been extensively applied world-wide, and many exciting results have been achieved ...

  6. Multi-office engineering

    International Nuclear Information System (INIS)

    Cowle, E.S.; Hall, L.D.; Koss, P.; Saheb, E.; Setrakian, V.

    1995-01-01

    This paper addresses the viability of multi-office project engineering as has been made possible in a large part by the computer age. Brief discussions are provided on two past projects describing the authors' initial efforts at multi-office engineering, and an in-depth discussion is provided on a current Bechtel project that demonstrates their multi-office engineering capabilities. Efficiencies and cost savings associated with executing an engineering project from multiple office locations was identified as a viable and cost-effective execution approach. The paper also discusses how the need for multi-office engineering came about, what is required to succeed, and where they are going from here. Furthermore, it summarizes the benefits to their clients and to Bechtel

  7. Hospital leadership perspectives on the contributions of Ronald McDonald Houses. Results from an international survey.

    Science.gov (United States)

    Lantz, Paula M; Rubin, Nicole; Mauery, D Richard

    2015-01-01

    The purpose of this paper is to describe an international survey of hospital executives and administrators' perspectives on the contributions of their affiliation with a Ronald McDonald House (RMH) as an example of accommodation in family-centered care to the hospital's mission, operations and patient experience. RMHs worldwide provided the names and e-mail addresses of the people holding key leadership positions in their main hospital partner, who in turn were invited to complete an internet-based survey (530 participants; response rate of 54.5 percent). Hospital leaders reported very positive opinions about the contributions of their RMHs affiliation to their ability to serve seriously ill children and their families. This included such important outcomes as increasing family integrity and family participation in care decisions; and decreasing psychosocial stress and hospital social work resource burdens associated with lodging, food, transportation and sibling support. Hospital chief executive offices (CEOs) and medical directors reported very strong and positive opinions regarding the value-added of their RMHs affiliation in many areas, including enhanced marketing of hospital specialty services and reduced length of stay. Survey response bias is a limitation, although the results are still useful in terms of identifying multiple ways in which RMHs are perceived as contributing to hospitals' operations and provision of family-centered care. Overall, the results suggest that, internationally, hospital leaders believe that RMHs play a key and valued role in their provision of family-centered care to seriously ill children and their families. Family accommodation is more than the simple provision of lodging and plays an integral role how hospitals approach family-centered care. This international study contributes to the general literature on the role of family accommodation in hospitals' provision of family-centered care and the specific and very sparse

  8. Discrete institutional alternatives: Theoretical and policy issues (Celebrating the 80th anniversary of Ronald Coase's “Nature of the Firm”

    Directory of Open Access Journals (Sweden)

    Andrey Shastitko

    2017-06-01

    Full Text Available This paper addresses the comparative analysis of discrete institutional alternatives in organizing transactions among distinct economic entities. The theoretical framework for understanding this issue was introduced by Ronald Coase 80 years ago. Following this seminal contribution, a standard theoretical distinction now exists between the institutionally embedded set of economic exchanges (the transactions and the institutional settings within which these transactions are organized, firms and markets being the epitomized polar cases. On the normative side, this approach facilitated better understanding of failures and flaws in the organization of numerous transactions and of how to fix them. Three examples are provided to illustrate the issues at stake: contracting on large diameter pipes for PJSC “Gazprom” infrastructure projects, contracting in commercial real estate, and determining governance mechanisms for companies facing significant switching costs in highly concentrated markets.

  9. I think of Ronald Reagan: future selves in the present.

    Science.gov (United States)

    Roberts, P

    1992-01-01

    A nonlinear perspective on time (where the future exists in and affects the present) has been described by several theorists but there is little research on the extent, quality or origins of the personal future perspective. The present study examined the existence and origin of the future in the present by asking adults aged nineteen to eighty-three to: 1) project themselves into the oldest age imaginable, 2) describe their hopes and fears for that age, and 3) name role models for those hopes and fears. Data analysis revealed that length of future perspective, number of hopes and number of role models for the distant future declined with age. In addition, types of fears for the future varied with age, with older adults stressing dependency issues while younger adults reported concerns about personality and mental health. Despite age differences, most participants could name role models for both their hopes and fears for aging, but specific models were identified more often for hopes than for fears. Personalized hopes and fears for the distant future as motivators for the present are discussed.

  10. Job task and functional analysis of the Division of Reactor Projects, office of Nuclear Reactor Regulation. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Morzinski, J.A.; Gilmore, W.; Hahn, H.A.

    1998-07-10

    A job task and functional analysis was recently completed for the positions that make up the regional Divisions of Reactor Projects. Among the conclusions of that analysis was a recommendation to clarify roles and responsibilities among site, regional, and headquarters personnel. As that analysis did not cover headquarters personnel, a similar analysis was undertaken of three headquarters positions within the Division of Reactor Projects: Licensing Assistants, Project Managers, and Project Directors. The goals of this analysis were to systematically evaluate the tasks performed by these headquarters personnel to determine job training requirements, to account for variations due to division/regional assignment or differences in several experience categories, and to determine how, and by which positions, certain functions are best performed. The results of this analysis include recommendations for training and for job design. Data to support this analysis was collected by a survey instrument and through several sets of focus group meetings with representatives from each position.

  11. Summary of computational support and general documentation for computer code (GENTREE) used in Office of Nuclear Waste Isolation Pilot Salt Site Selection Project

    International Nuclear Information System (INIS)

    Beatty, J.A.; Younker, J.L.; Rousseau, W.F.; Elayat, H.A.

    1983-01-01

    A Decision Tree Computer Model was adapted for the purposes of a Pilot Salt Site Selection Project conducted by the Office of Nuclear Waste Isolation (ONWI). A deterministic computer model was developed to structure the site selection problem with submodels reflecting the five major outcome categories (Cost, Safety, Delay, Environment, Community Impact) to be evaluated in the decision process. Time-saving modifications were made in the tree code as part of the effort. In addition, format changes allowed retention of information items which are valuable in directing future research and in isolation of key variabilities in the Site Selection Decision Model. The deterministic code was linked to the modified tree code and the entire program was transferred to the ONWI-VAX computer for future use by the ONWI project

  12. Implementation of the best in class project management and contract management initiative at the Department Of Energy's Office Of Environmental Management - 16062

    International Nuclear Information System (INIS)

    Van Camp, Scott G.; Stevenson, Jeremy S.; Deiters, Michael G.; Jamison, Timothy P.

    2009-01-01

    Since its creation in 1989, the Department of Energy (DOE), Office of Environmental Management (EM) has struggled with a legacy of inadequate project management and contract management. This has been manifested in recurring scope changes, cost overruns and schedule delays, and has been documented in multiple internal and external reviews. EM has committed itself to improving project performance and undertaken a number of proactive management initiatives including the development of a 'Best in Class' Project Management and Contract Management organization (i.e., the BICPM Initiative). During 2007, EM assessed the status of project management and contract management at 15 EM sites. These assessments evaluated strengths and weaknesses in 12 key project management capabilities and three contract management benchmarks. The January 2008 Compilation Assessment Report showed that EM faces significant challenges in its mission execution due to staffing shortages, project and contract management integration, insufficient project-oriented culture, and lack of a clear role for Headquarters in BICPM. EM then formulated a strategy to meet their objectives in the March 2008 Corporate Implementation Plan. It summarizes BICPM efforts, introduces the vision for BICPM, identifies the strategy for achieving BICPM, and describes a process for implementing BICPM. That is, it acts as a road-map to address EM's challenges. It also documents 18 Recommended Priority Actions (RPAs) that are the key to correcting these challenges. These RPAs provide a clear path forward that can be communicated to the entire EM organization and provide the foundation upon which a BICPM culture can be built. EM has since gained considerable momentum and progress towards institutionalizing BICPM. This paper provides a discussion of the BICPM Initiative and its implementation. (authors)

  13. Auxiliary office chair

    OpenAIRE

    Pascual Osés, Maite

    2007-01-01

    The aim of this project is to develop an auxiliary office chair, which favorably will compete with the existing chairs on the market. Evolutions of ergonomical survey in the work environment and on the configuration of offices require new products which fulfill the requirements properly. In order to achieve it a survey about office chairs has been carried out: types, characteristics, ways of usage and products on the market besides a large antropometrical study and ergonomics related to work ...

  14. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : 2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

    2003-06-30

    The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day system is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day, who contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2002, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies

  15. Socioeconomic Factors and Personal Characteristics Affecting the Retention of Officers in the United States Army and United States Marine Corps.

    Science.gov (United States)

    1987-06-01

    s), and count prior enlisted time." Variable used as given (total months). f (promotion probability): 032 "What do you think your chances are of being...June 1986. 27. Zald, Mayer N. and Simon , William. "Career Opportunities and Commitments Among Officers." in The New Military, pp. 257-285. Edited...Western Publishing Co., 1975. 163 N)2 :.:;.)5;*:;:;:-:-::-:’:-; *:. BIBLIOGRAPHY Blackburn , Ronald L. and Johnson, Randall L. "Turnover of Junior Officers

  16. Enhancing International Research and Development-Project Activity on University Campuses: Insights from U.S. Senior International Officers

    Science.gov (United States)

    Koehn, Peter H.; Deardorff, Darla K.; Bolognese, Kerry D.

    2011-01-01

    In the interconnected world of the UN Decade of Education for Sustainable Development, the ability of higher-education institutions to contribute to and benefit from international research undertakings, sustainable-development-project activity, and capacity-building endeavors requires transnational involvement. While the potential benefits are…

  17. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office: watershed restoration projects: annual report, 1999.; ANNUAL

    International Nuclear Information System (INIS)

    2001-01-01

    The John Day River is the second longest free-flowing river in the contiguous United States and one of the few major subbasins in the Columbia River basin containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, the fourth largest drainage area in Oregon. With its beginning in the Strawberry Mountains near the town of Prairie City, the John Day flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring chinook salmon and summer steelhead, red band, westslope cutthroat, and redband trout, the John Day system is truly one of national significance. The entire John Day basin was granted to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) initiated contracting the majority of its construction implementation actions with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of the projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 1999, the JDBO and GSWCD proposed continuation of a successful partnership between the two agencies and basin landowners to implement an additional eleven (11

  18. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office: watershed restoration projects: annual report, 1998.; ANNUAL

    International Nuclear Information System (INIS)

    1999-01-01

    The John Day River is the second longest free-flowing river in the contiguous US and one of the few major subbasins in the Columbia River basin containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, the fourth largest drainage area in Oregon. With its beginning in the Strawberry Mountains near the town of Prairie City, the John Day flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring chinook salmon and summer steelhead, red band, westslope cutthroat, and redband trout, the John Day system is truly one of national significance. The entire John Day basin was granted to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) initiated contracting the majority of its construction implementation actions with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of the projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 1998, the JDBO and GSWCD proposed continuation of a successful partnership between the two agencies and basin landowners to implement an additional ten (10) watershed

  19. Dr. David Sawyer, Mickey Mouse and Dr. David Brown attend a ceremony at Ronald McNair Middle School

    Science.gov (United States)

    1999-01-01

    Dr. David Sawyer (left), Superintendent of the Brevard County School District, Mickey Mouse, and Dr. David Brown, a NASA astronaut, attend a tribute to NASA astronaut Ronald McNair held in the gymnasium of Ronald McNair Magnet School in Cocoa, Fla. During the tribute, Walt Disney World presented a portrait of McNair to the school, which had previously been renamed for the fallen astronaut. McNair was one of a crew of seven who lost their lives during an accident following launch of the Space Shuttle Challenger in January 1986.

  20. Grand Junction projects office mixed-waste treatment program, VAC*TRAX mobile treatment unit process hazards analysis

    Energy Technology Data Exchange (ETDEWEB)

    Bloom, R.R.

    1996-04-01

    The objective of this report is to demonstrate that a thorough assessment of the risks associated with the operation of the Rust Geotech patented VAC*TRAX mobile treatment unit (MTU) has been performed and documented. The MTU was developed to treat mixed wastes at the US Department of Energy (DOE) Albuquerque Operations Office sites. The MTU uses an indirectly heated, batch vacuum dryer to thermally desorb organic compounds from mixed wastes. This process hazards analysis evaluated 102 potential hazards. The three significant hazards identified involved the inclusion of oxygen in a process that also included an ignition source and fuel. Changes to the design of the MTU were made concurrent with the hazard identification and analysis; all hazards with initial risk rankings of 1 or 2 were reduced to acceptable risk rankings of 3 or 4. The overall risk to any population group from operation of the MTU was determined to be very low; the MTU is classified as a Radiological Facility with low hazards.

  1. Grand Junction projects office mixed-waste treatment program, VAC*TRAX mobile treatment unit process hazards analysis

    International Nuclear Information System (INIS)

    Bloom, R.R.

    1996-04-01

    The objective of this report is to demonstrate that a thorough assessment of the risks associated with the operation of the Rust Geotech patented VAC*TRAX mobile treatment unit (MTU) has been performed and documented. The MTU was developed to treat mixed wastes at the US Department of Energy (DOE) Albuquerque Operations Office sites. The MTU uses an indirectly heated, batch vacuum dryer to thermally desorb organic compounds from mixed wastes. This process hazards analysis evaluated 102 potential hazards. The three significant hazards identified involved the inclusion of oxygen in a process that also included an ignition source and fuel. Changes to the design of the MTU were made concurrent with the hazard identification and analysis; all hazards with initial risk rankings of 1 or 2 were reduced to acceptable risk rankings of 3 or 4. The overall risk to any population group from operation of the MTU was determined to be very low; the MTU is classified as a Radiological Facility with low hazards

  2. OPERATION DOMINIC, FISH BOWL SERIES. Project Officer’s Report. Project 8B. Nuclear Weapon X-Ray Effects as Measured by Passive Instruments

    Science.gov (United States)

    1985-09-01

    different environ- ments of SF’ and Marshmallow . The data from the Marshmallow gages are reduced and reported in this section; comparison to SF...were adjusted accordingly. Failure of similar gages to fracture in the Marshmallow event made it appear desirable to increase the probability of...and Capt. Claude M. Gillespie; "Reentry Vehicle Composites (U)" POR-1853, Project 834, Operation Nougat, Shot Marshmallow , May 1963; Air Force

  3. Projects at the Western Environmental Technology Office. Quarterly technical progress report, July 1, 1995--September 30, 1995

    International Nuclear Information System (INIS)

    1996-01-01

    The goal of this project is to demonstrate the technical and economic feasibility of commercializing a biotechnology that uses plants to remediate soils, sediments, surface waters, and groundwaters contaminated by heavy metals and radionuclides. This technology, known as phytoremediation, is particularly suited to remediation of soils or water where low levels of contaminants are widespread. Project objectives are to provide an accurate estimate of the capability and rate of phytoremediation for removal of contaminants of concern from soils and groundwaters at Department of Energy (DOE) sites and to develop data suitable for engineering design and economic feasibility evaluations, including methods for destruction or final disposition of plants containing contaminants of concern. The bioremediation systems being evaluated could be less expensive than soil removal and treatment systems, given the areal extent and topography of sites under consideration and the investment of energy and money in soil-moving and -treating processes. In situ technology may receive regulatory acceptance more easily than ex situ treatments requiring excavation, processing, and replacement of surface soils. In addition, phytoremediation may be viable for cleanup of contaminated waters, either as the primary treatment or the final polishing stage, depending on the contaminant concentrations and process economics considerations

  4. Projects at the Western Environmental Technology Office. Quarterly technical progress report, July 1, 1995--September 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    The goal of this project is to demonstrate the technical and economic feasibility of commercializing a biotechnology that uses plants to remediate soils, sediments, surface waters, and groundwaters contaminated by heavy metals and radionuclides. This technology, known as phytoremediation, is particularly suited to remediation of soils or water where low levels of contaminants are widespread. Project objectives are to provide an accurate estimate of the capability and rate of phytoremediation for removal of contaminants of concern from soils and groundwaters at Department of Energy (DOE) sites and to develop data suitable for engineering design and economic feasibility evaluations, including methods for destruction or final disposition of plants containing contaminants of concern. The bioremediation systems being evaluated could be less expensive than soil removal and treatment systems, given the areal extent and topography of sites under consideration and the investment of energy and money in soil-moving and -treating processes. In situ technology may receive regulatory acceptance more easily than ex situ treatments requiring excavation, processing, and replacement of surface soils. In addition, phytoremediation may be viable for cleanup of contaminated waters, either as the primary treatment or the final polishing stage, depending on the contaminant concentrations and process economics considerations.

  5. Set up for Success: An Examination of the Ronald E. McNair Postbaccalaureate Achievement Program's Mentoring Component

    Science.gov (United States)

    Wyre, Dwuena Cene

    2011-01-01

    Often, individuals are set up to fail. However, effective mentoring can set individuals up to succeed. This nonexperimental cross-sectional, predictive study examines the Ronald E. McNair Postbaccalaureate Achievement Program's mentoring component. Specific focus is placed on faculty mentor competency and its impact on McNair student intent to…

  6. 75 FR 62120 - Notice of Availability of Draft Basis for Determination Under Section 3116 of the Ronald W...

    Science.gov (United States)

    2010-10-07

    ... DEPARTMENT OF ENERGY Notice of Availability of Draft Basis for Determination Under Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA) for Closure of the F-Tank Farm at the Savannah River Site AGENCY: U.S. Department of Energy. ACTION: Notice of...

  7. Annual Report 2008 -- Office of the Chief Financial Officer (OCFO)

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez, Jeffrey

    2008-12-22

    It is with great pleasure that I present to you the 2008 Chief Financial Officer's Annual Report. The data included in this report has been compiled from the Budget Office, the Controller, Procurement and Property Management and the Sponsored Projects Office. Also included are some financial comparisons with other DOE Laboratories and a glossary of commonly used acronyms.

  8. The Montreal General Hospital Pain Centre (1974-2000: The Contributions of Ronald Melzack

    Directory of Open Access Journals (Sweden)

    Mary Ellen Jeans

    2000-01-01

    Full Text Available This paper chronicles the development of the Montreal General Hospital Pain Centre from its inception in 1974 to the present. Highlighted in particular are the contributions of Ronald Melzack to this history. Data for the article arose, in the main, from an interview with Dr Melzack carried out earlier in the year. Discussions with former and present members of the pain centre team, including former graduate students, provided additional information. The article begins with a recounting of those individuals and events that inspired Ron early in his 'pain career' to pursue his dream of a multidisciplinary pain centre, the first of its kind in Canada. The forces that helped shape the development of this centre and the challenges that had to be overcome are described.

  9. The world of Ronald McDonald: on the trademark and the mediatic sociality

    OpenAIRE

    Fontenelle, Isleide Arruda

    2002-01-01

    O palhaço Ronald McDonald -- uma das imagens de marca da Corporação McDonald's -- é tomado como paradigma para pensarmos as relações entre mercado, mídia e entretenimento, as quais tem uma ligação direta com o que estamos conceituando como "socialidade midiática". Enquanto uma metáfora ideal de uma propaganda que parece não querer mais fazer sentido, a história do palhaço nos permite desvendar os sentidos contidos em duas das principais práticas do marketing moderno, a propaganda e a publicid...

  10. Mitchell Receives 2013 Ronald Greeley Early Career Award in Planetary Science: Citation

    Science.gov (United States)

    McKinnon, William B.

    2014-07-01

    The Greeley Early Career Award is named for pioneering planetary scientist Ronald Greeley. Ron was involved in nearly every major planetary mission from the 1970s until his death and was extraordinarily active in service to the planetary science community. Ron's greatest legacies, however, are those he mentored through the decades, and it is young scientists whose work and promise we seek to recognize. This year's Greeley award winner is Jonathan L. Mitchell, an assistant professor at the University of California, Los Angeles (UCLA). Jonathan received his Ph.D. from the University of Chicago, and after a postdoc at the Institute for Advanced Studies in Princeton, he joined the UCLA faculty, where he holds a joint appointment in Earth and space sciences and in atmospheric sciences.

  11. The politics of presidential illness. Ronald Reagan and the Iran-Contra Scandal.

    Science.gov (United States)

    Gilbert, Robert E

    2014-01-01

    This paper assesses the likelihood that the Iran-Contra scandal was shaped heavily by the effects of Ronald Reagan's cancer surgery in summer, 1985. During the President's hospitalization and in the period soon after, he took several actions--which he apparently did not remember--that launched a policy that was unwise, counterproductive, and a failure. These damaged both his Administration and his standing in history. The 25th Amendment afforded Reagan the means by which his involvement in these events could easily have been avoided. However, the President and his aides determined that he would resume the powers and duties of the presidency only hours after undergoing extensive cancer surgery. This decision contributed materially to the most damaging episode of Reagan's eight-year presidency.

  12. Granular, soft and fuzzy approaches for intelligent systems dedicated to professor Ronald R. Yager

    CERN Document Server

    Filev, Dimitar; Beliakov, Gleb

    2017-01-01

    This book offers a comprehensive report on the state-of-the art in the broadly-intended field of “intelligent systems”. After introducing key theoretical issues, it describes a number of promising models for data and system analysis, decision making, and control. It discusses important theories, including possibility theory, the Dempster-Shafer theory, the theory of approximate reasoning, as well as computing with words, together with novel applications in various areas, such as information aggregation and fusion, linguistic data summarization, participatory learning, systems modeling, and many others. By presenting the methods in their application contexts, the book shows how granular computing, soft computing and fuzzy logic techniques can provide novel, efficient solutions to real-world problems. It is dedicated to Professor Ronald R. Yager for his great scientific and scholarly achievements, and for his long-lasting service to the fuzzy logic, and the artificial and computational intelligence communit...

  13. The New Secular Humanists: Ronald Dworkin and Philip Kitcher on Life without God

    Directory of Open Access Journals (Sweden)

    Charles Taliaferro

    2015-07-01

    Full Text Available Ronald Dworkin and Philip Kitcher recognize that traditional, religious faith—especially in Christian theistic tradition—has virtues that seem to be missing in a secular worldview. To remedy this apparent deficit, they both propose that a secular worldview can provide a satisfying foundation for a flourishing, meaningful life. Moreover, Kitcher argues that secular humanism is far more justified than a religious worldview because it does not face the problem of diversity that arises in the case of religion. I argue that secular humanism faces the same problem of diversity that Kitcher proposes undermines religious belief. I further argue that Dworkin’s and Kitcher’s secular alternative to a religious worldview is problematic.

  14. The Users Office turns 20

    CERN Multimedia

    2009-01-01

    20 years ago, in the summer of 1989, an office was created to assist the thousands of users who come to CERN each year, working over the broad range of projects and collaborations. Chris Onions (right), head of the Users’ Office, with Bryan Pattison (left), the Office’s founder.Before the inception of the Users Office, it was common for users to spend at least an entire day moving from office to office in search of necessary documentation and information in order to make their stay official. "Though the Office has undergone various changes throughout its lifetime, it has persisted in being a welcoming bridge to facilitate the installation of visitors coming from all over the world", says Chris Onions, head of the Users Office. This September, the Office will celebrate its 20-year anniversary with a drink offered to representatives of the User community, the CERN management and staff members from the services with whom the Office is involved. &...

  15. Underway pCO2 and other measurements aboard NOAA Ship Ronald H. Brown during the 2007 cruises (NODC Accession 0081023)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0081023 includes Surface underway, chemical, meteorological, optical and physical data collected from NOAA Ship RONALD H. BROWN in the Caribbean Sea,...

  16. Office Hysteroscopy

    OpenAIRE

    Hikmet Hassa; Basar Tekin; H. Mete Tanir; Bulent Cakmak

    2007-01-01

    Although hysteroscopy has evolved in recent years, its use in the office setting was not made practical until early 1980s with the introduction of small caliber hysteroscopes of less than 5- mm outer diameter.This innovation simplifies ambulatory uterine exploration and the office evaluation of patients with abnormal uterine bleeding. This article reviews current trends in office hysteroscopy and its areas of application in different forms of gynecological problems.

  17. Office Hysteroscopy

    Directory of Open Access Journals (Sweden)

    Hikmet Hassa

    2007-06-01

    Full Text Available Although hysteroscopy has evolved in recent years, its use in the office setting was not made practical until early 1980s with the introduction of small caliber hysteroscopes of less than 5- mm outer diameter.This innovation simplifies ambulatory uterine exploration and the office evaluation of patients with abnormal uterine bleeding. This article reviews current trends in office hysteroscopy and its areas of application in different forms of gynecological problems.

  18. Two theories on the test bench: Internal and external validity of the theories of Ronald Inglehart and Shalom Schwartz

    OpenAIRE

    Datler, Georg; Jagodzinski, Wolfgang; Schmidt, Peter

    2013-01-01

    In the last decades value research has produced a vast number of theoretical concepts. However, it is unclear how the different value theories relate to each other. This study makes a first step toward a systematic comparison of value theories. It focuses on the individual level of the two approaches that are, at present, probably the most prominent in international research - the theory of basic human values of Shalom Schwartz and the postmodernization theory of Ronald Inglehart. Using data ...

  19. Investigation of Mycobacterium tuberculosis transmission aboard the U.S.S. Ronald Reagan, 2006.

    Science.gov (United States)

    Buff, Ann M; Deshpande, Swati J; Harrington, Theresa A; Wofford, Taylor S; O'Hara, Timothy W; Carrigan, Kenichi; Martin, Nicholas J; McDowell, Jackie C; Ijaz, Kashef; Jensen, Paul A; Lambert, Lauren A; Moore, Marisa; Oeltmann, John E

    2008-06-01

    Pulmonary tuberculosis (TB) was diagnosed in a sailor aboard the U.S.S. Ronald Reagan; an investigation was conducted to determine a screening strategy for 1,172 civilian passengers who were aboard during a temporary guest rider program. Sailors were screened for latent TB infection (LTBI) and TB disease. A case-control study was conducted among sailors to determine factors associated with new LTBI. No secondary TB disease was identified; 13% of close contacts had new LTBI. Factors associated with new LTBI among sailors were having been born outside the United States (adjusted odds ratio = 2.80; 95% confidence interval, 1.55--5.07) and being a carrier air wing member (adjusted odds ratio = 2.89; 95% confidence interval, 1.83--4.58). Among 38 civilian passengers berthed near the patient, 1 (3%) had LTBI. The investigation results indicated that Mycobacterium tuberculosis transmission was minimal and eliminated unnecessary TB screening for 1,134 civilians which saved public health resources.

  20. Polish Adaptation of the Psychache Scale by Ronald Holden and Co-workers.

    Science.gov (United States)

    Chodkiewicz, Jan; Miniszewska, Joanna; Strzelczyk, Dorota; Gąsior, Krzysztof

    2017-04-30

    The conducted study was aimed at making a Polish adaptation of the Scale of Psychache by Ronald Holden and co-workers. The scale is a self-assessment method which comprises 13 statements and is designed to assess subjectively experienced psychological pain. 300 persons were examined - undergraduates and postgraduates of the University of Lodz and the Technical University of Lodz. The group of the study participants consisted of 185 women and 115 men. Moreover, there were examined 150 alcohol addicted men, 50 co-addicted women and 50 major depressive episode (MDE) patients. The Polish version of the Scale is a reliable and valid tool. The exploratory and confirmatory factor analysis has proved the existence of one factor. The internal consistency, assessed on the basis of Cronbach's alpha, equalled 0.93. The method displays positive and statistically significant relationships to levels of depression, hopelessness, anxiety, anhedonia and negative relations to levels of optimism, life satisfaction, and positive orientation. Alcohol addicted men with presently diagnosed suicidal thoughts were characterised by a significantly higher level of psychological pain as compared to alcoholics without such thoughts. A higher level of psychache was also reported in people with depression who have a history of attempted suicide compared with those who have not attempted suicide. The effect of the conducted adaptation works on the Psychache Scale speaks for recommending the method for scientific research and use in therapeutic practice.

  1. Office Space: How Will Technology Affect the Education Office Environment?

    Science.gov (United States)

    Day, C. William

    2009-01-01

    The office environment 10 years from now will be different from the one today. More office personnel will be organized around processes rather than functions. More work activities will be done by teams rather than individuals, and those teams will change over time, as will the nature of the work projects and the people who constitute the team. The…

  2. Why Black Officers Still Fail

    Science.gov (United States)

    2010-01-01

    that ROTC programs were being staffed with lower performing and less qualified officers to educate young black officers. He based this conclusion on...come to mutually supporting conclusions. In a 2008 USAWC Strategy Research Project, while exploring the effects of ethnocentrism and its affect on

  3. Radiation protection research projects. Programme report 2013. Summary of results from recent research projects of the BMU's Applied Research Programme carried out under the responsibility of the German Office of Radiation Protection (BfS); Strahlenschutzforschung. Programmreport 2013. Bericht ueber das vom Bundesamt fuer Strahlenschutz fachlich begleitete und administrativ umgesetzte Forschungsprogramm Strahlenschutz des Bundesministeriums fuer Umwelt, Naturschutz, Bau und Reaktorsicherheit

    Energy Technology Data Exchange (ETDEWEB)

    Schmitt-Hannig, Annemarie; Goedde, Ralph; Loebke-Reinl, Angelika; Hachenberger, Claudia; Trugenberger-Schnabel, Angela (comps.)

    2014-09-15

    On behalf of the Federal Ministry for the Environment, Nature Conservation, Building and Nuclear Safety (BMUB) the Federal Office for Radiation Protection (BfS) awards research grants for projects in the field of radiation protection. The findings of these projects serve as decision aiding information in the development of radiation protection regulations as well as in the fulfilment of specific tasks in the field of radiation protection. Planning, technical and administrative preparation, awarding of contracts, general support as well as the technical evaluation of research and study projects are tasks of the Federal Office for Radiation Protection. This report provides information on preliminary (in the form of status reports) and, where applicable, final results of radiation protection projects within the BMUB's Environmental Research Plan for the year 2013.

  4. Radiation protection research projects. Programme report 2010. Summary of results from recent research projects of the BMU's Applied Research Programme carried out under the responsibility of the German Office of Radiation Protection (BfS); Strahlenschutzforschung. Programmreport 2010. Bericht ueber das vom Bundesamt fuer Strahlenschutz fachlich begleitete und administrativ umgesetzte Forschungsprogramm Strahlenschutz des Bundesministeriums fuer Umwelt, Naturschutz und Reaktorsicherheit

    Energy Technology Data Exchange (ETDEWEB)

    Bernhard-Stroel, Claudia; Goedde, Ralph; Hachenberger, Claudia; Loebke-Reinl, Angelika; Schmitt-Hannig, Annemarie

    2011-11-15

    On behalf of the Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU) the Federal Office for Radiation Protection (BfS) awards research grants for projects in the field of radiation protection. The findings of these projects serve as decision aiding information in the development of radiation protection regulations as well as in the fulfilment of specific tasks in the field of radiation protection. Planning, technical and administrative preparation, awarding of contracts, general support as well as the technical evaluation of research and study projects are tasks of the Federal Office for Radiation Protection. This report provides information on preliminary and, where applicable, final results (in the form of status reports) of radiation protection projects within the BMU's Environmental Research Plan for the year 2010. (orig.)

  5. Radiation protection research projects. Programme report 2012. Summary of results from recent research projects of the BMU's Applied Research Programme carried out under the responsibility of the German Office of Radiation Protection (BfS); Strahlenschutzforschung. Programmreport 2012. Bericht ueber das vom Bundesamt fuer Strahlenschutz fachlich begleitete und administrativ umgesetzte Forschungsprogramm Strahlenschutz des Bundesministeriums fuer Umwelt, Naturschutz und Reaktorsicherheit

    Energy Technology Data Exchange (ETDEWEB)

    Bernhard-Stroel, Claudia; Goedde, Ralph; Hachenberger, Claudia; Loebke-Reinl, Angelika; Schmitt-Hannig, Annemarie; Trugenberger-Schnabel, Angela

    2013-12-15

    On behalf of the Ministry for the Environment, Nature Conservation and Nuclear Safety (BMU) the Federal Office for Radiation Protection (BfS) awards research grants for projects in the field of radiation protection. The findings of these projects serve as decision aiding information in the development of radiation protection regulations as well as in the fulfilment of specific tasks in the field of radiation protection. Planning, technical and administrative preparation, awarding of contracts, general support as well as the technical evaluation of research and study projects are tasks of the Federal Office for Radiation Protection. This report provides information on preliminary (in the form of status reports) and, where applicable, final results of radiation protection projects within the BMU's Environmental Research Plan for the year 2012.

  6. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  7. First Meeting with Teachers and Principals of Unesco Associated Schools Project Held on Monday, 6 September 1982 at the Training Division, Prime Minister's Office, Castries, Saint Lucia.

    Science.gov (United States)

    International Understanding at School, 1982

    1982-01-01

    In September 1982, K-12 teachers and principals participating in Unesco's Associated Schools Project met to make preparations for the implementation of the project that was to commence when schools opened later that month. The project is intended to promote international understanding and peace. What happened at the meeting is described. (RM)

  8. Mail Office

    CERN Multimedia

    GS Department

    2009-01-01

    The Mail Office wishes to remind users that the CERN mail service is exclusively reserved for official CERN mail. All external official mail must be sent to the Mail Office in an unstamped envelope on which your name and Department must be clearly indicated below the official CERN address (see example) to help us to find you in the event that it cannot be delivered. If you wish to send private mail from the CERN site you must use the post offices at Meyrin (63-R-011) or Prévessin (866-R-C02). Please use "PRIORITY" envelopes only in the case of urgent mail. Any mail containing merchandise (i.e. anything other than documents) must be sent using an EDH shipping request form. INTERNAL MAIL Please remember to include the recipient’s MAILBOX number on the internal mail envelopes, either in the relevant box (new envelopes) or next to the name (old envelopes). This information, which can be found in the CERN PHONEBOOK, simplifies our t...

  9. Annual report to the Advisory Council on Historic Preservation and the Colorado State Historic Preservation Officer on the US Department of Energy's cultural resource activities at Colorado UMTRA Project sites, January--December 1991

    International Nuclear Information System (INIS)

    1992-04-01

    This report is a summary of the US Department of Energy's (DOE) cultural resource investigations for the Uranium Mill Tailings Remedial Action (UMTRA) Project sites in Colorado. This report is intended to fulfill the DOE's obligation for an annual report as stated in the Programmatic Memorandum of Agreement executed between the DOE, the Advisory Council on Historic Preservation, and the Colorado State Historic Preservation Officer in December 1984. Summaries of the cultural resource surveys and identified resources are provided for the UMTRA Project sites in the vicinities of Durango, Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock. This report covers all UMTRA Project cultural resource activities in Colorado from January through December 1991

  10. Steps Towards Determining the Right Number of Dental Recruits the Navy Should Access to Meet the Projected Targets for Navy Dental Corps Officers

    Science.gov (United States)

    2007-03-01

    Periodontics , Oral Surgery, and Prosthodontics. 1. Overall Dental Corps The data included for the overall loss rate for the Dental Corps included...Endodontists. This may occur due to the pay disparity between military and civilian Oral Surgeons. The Dental Corps attempts to mitigate the loss ...gum disease . Periodontics is another specialty that Dental Corps officers can decide to practice. NNMC, Naval Postgraduate Dental School offers a

  11. An Exploratory Study of the Experiences of Recent Graduates Who Participated in the Ronald E. McNair Postbaccalaureate Achievement Program

    Science.gov (United States)

    Thomas, Zaducka T. C.

    2012-01-01

    The purpose of this qualitative study was to explore the experiences of recent graduates who participated in the Ronald E. McNair Postbaccalaureate Achievement Program at a medium-size southeastern university. This research used a phenomenological approach, as well as qualitative interviews, to provide a detailed and insightful description about…

  12. Compressed Air System Renovation Project Improves Production at a Food Processing Facility: Office of Industrial Technologies (OIT) BestPractices Technical Case Study

    International Nuclear Information System (INIS)

    Wogsland, J.

    2001-01-01

    This case study is one in a series on industrial firms who are implementing energy efficient technologies and system improvements into their manufacturing processes. This case study documents the activities, savings, and lessons learned on the food processing facility project

  13. Are You Managing Your Email - Or is Email Managing You? An Analysis of Email Among Personnel Within Army Project Management Offices

    National Research Council Canada - National Science Library

    Baroni, Brian; Cook, Linda; Keitelman, Marian; Miller, Steven; Wardle, Adelia

    2005-01-01

    Based on a class project that developed leadership communication competencies for seven levels of Army civilians, email was found to be the most prevalent means of communication, regardless of leadership level...

  14. First use of halothane in the United States, C. Ronald Stephen, M.D. (1916-2006).

    Science.gov (United States)

    Giesecke, Adolph H

    2008-01-01

    Anesthesia is one of the most valued discoveries in all of history. Almost immediately after the first public demonstration of ether anesthesia, a search for a better drug began. Ether, despite its flammability, persisted as the primary inhalation agent for over a hundred years. The breakthrough came with the introduction of a non-flammable volatile anesthetic called halothane in 1955. The drug was approved by the FDA in 1958 and quickly became the most commonly used agent in the United States. It was a quantum leap forward in the safety of anesthetic drugs. It became obsolete in 1988 because of hepatotoxicity. Three eminent anesthesiologists: Drs. Abajian of Vermont, Siker of Pittsburgh and Stephen of Duke could have been the first to use halothane in the USA. My review of the documents and writings of the three confirm that Dr. C. Ronald Stephen of Duke University was indeed the first to use and publish on halothane anesthesia in the USA.

  15. MicroBooNE project team recognized by Department of Energy | News

    Science.gov (United States)

    Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of

  16. Office of Child Care

    Science.gov (United States)

    ... for Children & Families Office of Child Care By Office Administration for Native Americans (ANA) Administration on Children, ... about the Child Care Rule > What is the Office of Child Care (OCC)? The Office of Child ...

  17. 75 FR 55786 - Office of Special Education Programs, Office of Special Education and Rehabilitative Services...

    Science.gov (United States)

    2010-09-14

    ... DEPARTMENT OF EDUCATION Office of Special Education Programs, Office of Special Education and Rehabilitative Services, Department of Education; Notice of Final Extension of Project Period and Waiver for the... Transition Technical Assistance Center (NSTTAC). Currently, the Office of Special Education Programs (OSEP...

  18. 75 FR 55785 - Office of Special Education Programs, Office of Special Education and Rehabilitative Services...

    Science.gov (United States)

    2010-09-14

    ... DEPARTMENT OF EDUCATION Office of Special Education Programs, Office of Special Education and Rehabilitative Services, Department of Education; Notice of Final Extension of Project Period and Waiver for the... this award, the Office of Special Education Programs (OSEP) funds NCEO to address national, State, and...

  19. Joint project to implement a training course/seminar for high-level decision making officals on nuclear policy between Korea and IAEA

    International Nuclear Information System (INIS)

    Lee, E. J.; Suh, S. H.; Kim, S. H. and others

    2001-09-01

    Through this project, the KAERI has published a english text book titled 'Nuclear Power project: Policy and Korean Experience' with the cooperation with the Agency. Korean experts, who have more than 30 years experiences in nuclear policy and nuclear power project management, involved to prepare the contents. Experts, who are working for Department of Nuclear Energy and Department of Technical Cooperation in the Agency, reviewed the contents. The KAERI has provided a training course/seminar for a high-level delegation of nuclear policy decision makers, which is consisted of 3 deputy ministers and 3 general directors in Viet Nam Communist Party, Assembly, Government Departments, upon the agreement between Vietnam Atomic Energy Commission (VAEC) and MOST at Hanoi in November 2000. The KAERI decided to provide the IAEA regional training course for middle level managers of nuclear policy and project management in RCA member states in November 2001 and 2002 under the cooperation with the Agency and the Korea International Cooperation Agency (KOICA). The training course curricula, a english text book will be utilized as basic technical materials to promote the national nuclear cooperation program with the developing countries, that are considering to introduce the first or a new nuclear power plant, such as China, Indonesia, Bangladesh, Morocco, Egypt, Ukraine, etc. Through the project, the bilateral nuclear cooperation between Viet Nam and Korea in the field of nuclear manpower development has improved practically. The KAERI has decided to provide on-the job-training program for Vietnamese experts in the field of nuclear policy, safety analysis, thermal-hydraulic analysis, etc under the 2000 KISTEP Scientist Exchange Program

  20. Joint project to implement a training course/seminar for high-level decision making officals on nuclear policy between Korea and IAEA

    Energy Technology Data Exchange (ETDEWEB)

    Lee, E. J.; Suh, S. H.; Kim, S. H. and others

    2001-09-01

    Through this project, the KAERI has published a english text book titled 'Nuclear Power project: Policy and Korean Experience' with the cooperation with the Agency. Korean experts, who have more than 30 years experiences in nuclear policy and nuclear power project management, involved to prepare the contents. Experts, who are working for Department of Nuclear Energy and Department of Technical Cooperation in the Agency, reviewed the contents. The KAERI has provided a training course/seminar for a high-level delegation of nuclear policy decision makers, which is consisted of 3 deputy ministers and 3 general directors in Viet Nam Communist Party, Assembly, Government Departments, upon the agreement between Vietnam Atomic Energy Commission (VAEC) and MOST at Hanoi in November 2000. The KAERI decided to provide the IAEA regional training course for middle level managers of nuclear policy and project management in RCA member states in November 2001 and 2002 under the cooperation with the Agency and the Korea International Cooperation Agency (KOICA). The training course curricula, a english text book will be utilized as basic technical materials to promote the national nuclear cooperation program with the developing countries, that are considering to introduce the first or a new nuclear power plant, such as China, Indonesia, Bangladesh, Morocco, Egypt, Ukraine, etc. Through the project, the bilateral nuclear cooperation between Viet Nam and Korea in the field of nuclear manpower development has improved practically. The KAERI has decided to provide on-the job-training program for Vietnamese experts in the field of nuclear policy, safety analysis, thermal-hydraulic analysis, etc under the 2000 KISTEP Scientist Exchange Program.

  1. Research activities in radiation protection. Programme report 1996. Report on the departmental research programme of the Federal Ministry for Environment, Nature Conservation and Reactor Safety (BMU), performed under the scientific and administrative project management of the Federal Office for Radiation Protection (BfS)

    International Nuclear Information System (INIS)

    Schmitt-Hannig, A.; Thieme, M.; Goedde, R.

    1997-02-01

    On behalf of the Ministry for Environment, Nature Conservation and Nuclear Safety (BMU), the Federal Office for Radiation Protection is placing research and study contracts in the field of radiation protection. The results of these projects are used for developing radiation protection rules and to fulfill the special radiation protection tasks of the BMU, required by law. Planning, expert and administrative management, placing, assistance as well as expert evaluation of the results from these research projects lies within the responsibility of the Federal Office for Radiation Protection. This report provides information on preliminary and final results of radiation protection projects within the BMU Department Research Programme of the year 1996. (orig.) [de

  2. Report of Investigation: Ronald F. Lewis, Major General, U.S. Army

    Science.gov (United States)

    2016-10-04

    Neither, I, nor anyone authorized by me, nor anyone with my knowledge or consent received or expect to receive any benefit or value as a result of...1,121.25 in personal expenses to his GTCC, and received some form of services or benefits from those transactions. When Office of the Secretary of...Actually, I think this [the Candy Bar club] is right along the strip, you know, and it’s got whiskey, wine and beer on there [the sign], you know. That

  3. Project Energise: Using participatory approaches and real time computer prompts to reduce occupational sitting and increase work time physical activity in office workers.

    Science.gov (United States)

    Gilson, Nicholas D; Ng, Norman; Pavey, Toby G; Ryde, Gemma C; Straker, Leon; Brown, Wendy J

    2016-11-01

    This efficacy study assessed the added impact real time computer prompts had on a participatory approach to reduce occupational sedentary exposure and increase physical activity. Quasi-experimental. 57 Australian office workers (mean [SD]; age=47 [11] years; BMI=28 [5]kg/m 2 ; 46 men) generated a menu of 20 occupational 'sit less and move more' strategies through participatory workshops, and were then tasked with implementing strategies for five months (July-November 2014). During implementation, a sub-sample of workers (n=24) used a chair sensor/software package (Sitting Pad) that gave real time prompts to interrupt desk sitting. Baseline and intervention sedentary behaviour and physical activity (GENEActiv accelerometer; mean work time percentages), and minutes spent sitting at desks (Sitting Pad; mean total time and longest bout) were compared between non-prompt and prompt workers using a two-way ANOVA. Workers spent close to three quarters of their work time sedentary, mostly sitting at desks (mean [SD]; total desk sitting time=371 [71]min/day; longest bout spent desk sitting=104 [43]min/day). Intervention effects were four times greater in workers who used real time computer prompts (8% decrease in work time sedentary behaviour and increase in light intensity physical activity; pcomputer prompts facilitated the impact of a participatory approach on reductions in occupational sedentary exposure, and increases in physical activity. Copyright © 2016 Sports Medicine Australia. Published by Elsevier Ltd. All rights reserved.

  4. El Niño Rapid Response (ENRR) Field Campaign: Radiosonde Data (Level 2) from NOAA Ship Ronald H. Brown, 2016-02 to 2016-03 (NCEI Accession 0161527)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This dataset contains radiosonde data from NOAA Ship Ronald H. Brown, collected 16 February to 16 March 2016. These "Level 2" data have been reprocessed using...

  5. Stratus Ocean Reference Station (20 deg S, 85 deg W) Mooring Recovery and Deployment Cruise, R/V Ronald H. Brown Cruise 06-07, October 9-October 27, 2006

    National Research Council Canada - National Science Library

    Bigorre, Sebastien; Weller, Robert; Lord, Jeff; Whelan, Sean; Galbraith, Nancy; Wolfe, Dan; Bariteau, Ludovic; Ghate, Virendra; Zajaczkovski, Uriel; Vera, Alvaro

    2007-01-01

    .... During the October 2006 cruise of NOAA's R/V Ronald H. Brown to the ORS Stratus site, the primary activities where recovery of the Stratus 6 WHOI surface mooring that had been deployed in October...

  6. Stratus Ocean Reference Station (20 deg. S, 85 deg. W) : Mooring Recovery and Deployment Cruise, R/V Ronald H. Brown Cruise 05-05, September 26, 2005-October 21, 2005

    National Research Council Canada - National Science Library

    Hutto, Lara; Weller, Robert; Lord, Jeff; Smith, Jason; Bouchard, Paul; Fairall, Chris; Pezoa, Sergio; Bariteau, Ludovic; Lundquist, Jessica; Ghate, Virendra

    2006-01-01

    .... During the October 2005 cruise of NOAA's R/V Ronald H. Brown to the ORS Stratus site, the primary activities were recovery of the WHOl surface mooring that had been deployed in December 2004, deployment of a new...

  7. Oceanographic temperature and salinity measurements collected using CTD and XBT from NOAA Ship Nancy Foster/Ronald H Brown in the North Atlantic from 1998 to 2007 (NODC Accession 0043165)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Temperature, salinity and other measurements found in datasets XBT and CTD taken from NOAA Ship RONALD H. BROWN (NOAA SHIP - Call Sign WTEC)(formerly NOAA Ship...

  8. Temperature profile and pressure data from CTD casts from NOAA Ship RONALD H. BROWN and NOAA Ship KA'IMIMOANA in the TOGA area of Pacific Ocean from 1997-08-05 to 1999-06-28 (NODC Accession 9900141)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Temperature profile and pressure data were collected using CTD casts in the TOGA area of Pacific Ocean from NOAA Ship RONALD H. BROWN and NOAA Ship KA'IMIMOANA from...

  9. Partial pressure (or fugacity) of carbon dioxide, salinity and other variables collected from underway - surface observations using Barometric pressure sensor, Carbon dioxide (CO2) gas analyzer and other instruments from NOAA Ship RONALD H. BROWN in 2008 (NODC Accession 0109930)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NODC Accession 0109930 includes biological, chemical, meteorological, physical and underway - surface data collected from NOAA Ship RONALD H. BROWN in the North...

  10. El Niño Rapid Response (ENRR) Field Campaign: Surface Meteorological and Ship Data from NOAA Ship Ronald H. Brown, 2016-02 to 2016-03 (NCEI Accession 0161528)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This dataset contains surface meteorological and ship data from NOAA Ship Ronald H. Brown, collected 16 February to 16 March 2016. These data have been corrected for...

  11. The development of the Be Active & Relax “Vitality in Practice” (VIP project and design of an RCT to reduce the need for recovery in office employees

    Directory of Open Access Journals (Sweden)

    Coffeng Jennifer K

    2012-08-01

    Full Text Available Abstract Background There is strong evidence to suggest that multiple work-related health problems are preceded by a higher need for recovery. Physical activity and relaxation are helpful in decreasing the need for recovery. This article aims to describe (1 the development and (2 the design of the evaluation of a daily physical activity and relaxation intervention to reduce the need for recovery in office employees. Methods/Design The study population will consist of employees of a Dutch financial service provider. The intervention was systematically developed, based on parts of the Intervention Mapping (IM protocol. Assessment of employees needs was done by combining results of face-to-face interviews, a questionnaire and focus group interviews. A set of theoretical methods and practical strategies were selected which resulted in an intervention program consisting of Group Motivational Interviewing (GMI supported by a social media platform, and environmental modifications. The Be Active & Relax program will be evaluated in a modified 2 X 2 factorial design. The environmental modifications will be pre-stratified and GMI will be randomised on department level. The program will be evaluated, using 4 arms: (1 GMI and environmental modifications; (2 environmental modifications; (3 GMI; (4 no intervention (control group. Questionnaire data on the primary outcome (need for recovery and secondary outcomes (daily physical activity, sedentary behaviour, relaxation/detachment, work- and health-related factors will be gathered at baseline (T0, at 6 months (T1, and at 12 months (T2 follow-up. In addition, an economic and a process evaluation will be performed. Discussion Reducing the need for recovery is hypothesized to be beneficial for employees, employers and society. It is assumed that there will be a reduction in need for recovery after 6 months and 12 months in the intervention group, compared to the control group. Results are expected in 2013

  12. Electrical engineering research support for FDOT Traffic Statistics Office

    Science.gov (United States)

    2010-03-01

    The aim of this project was to provide electrical engineering support for the telemetered traffic monitoring sites (TTMSs) operated by the Statistics Office of the Florida Department of Transportation. This project was a continuation of project BD-54...

  13. The Wireless Craze, The Unlimited Bandwidth Myth, The Spectrum Auction Faux Pas, and the Punchline to Ronald Coase's 'Big Joke': An Essay on Airwave Allocation Policy

    OpenAIRE

    Hazlett, Thomas W.

    2001-01-01

    In 1959 the Federal Communications Commission invited economist Ronald Coase to testify about his proposal for market allocation of radio spectrum rights. The FCC's first question: 'Is this all a big joke'' Today, however, leading policy makers, including the current FCC Chair, decry the 'spectrum drought' produced by administrative allocation and call for the creation of private bandwidth markets. This essay examines marketplace trends driving regulators' change of humor, and considers the p...

  14. 77 FR 27214 - Applications for New Awards; Ronald E. McNair Postbaccalaureate Achievement Program

    Science.gov (United States)

    2012-05-09

    ..., individuals with disabilities, and women, who are provided with access to rigorous and engaging coursework in.... This would enable McNair projects to better measure the success of students selected for participation..., Taxpayer Identification Number, and Central Contractor Registry: To do business with the Department of...

  15. Communications and Media Relations Officer | IDRC - International ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Brings to the attention of the Media Relations Advisor and/or Social Media Officer in ... Monitors, evaluates and reports on the effectiveness and influence of IDRC's social ... projects to promote research results among regional decision-makers.

  16. Program Officer | IDRC - International Development Research Centre

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... and the regional offices on issues of project development and management; ... IDRC's contacts with other international agencies and Canadian institutions; ... including conceptual, methodological, operational, evaluative, and financial ...

  17. Communications and Public Relations Officer | IDRC - International ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Coordinates relations with journalists and the media in general and responds to ... the region's culture and communication capacity, both internally and externally. ... Systematically reviews, with program officers, projects likely to influence the ...

  18. Senior Program Officer | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Job Summary Working as a member of one or two multi-disciplinary teams under ... and the regional offices on issues of project development and management; ... identification and administration of resource persons/consultants in support of ...

  19. OPERATION DOMINIC. FISH BOWL SERIES. Project Officer’s Report. Project 8A.3. Close-In Thermal and X-Ray Vulnerability Measurements--Shots Blue Gill and King Fish

    Science.gov (United States)

    1985-09-01

    underground test in Nevada (Shot Marshmallow of Operation Nougat) in July 1962 was successful. Extensive data is available concerning the effect of X...and King Fish (Section 6.2.8 below). It was also used by ASE for the pinholes of Project 823 in Shot Marshmallow of Operation Nougat (Reference 27...in a cursory manner to those associated with the particle suspensions utilized in the Marshmallow under- ground test (Reference 27 ). This

  20. 2017 Building Technologies Office Peer Review Report

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2017-11-01

    The 2017 Building Technologies Office Peer Review Report summarizes the feedback submitted by reviewers for the 109 Building Technologies Office (BTO) projects presented at the 2017 BTO Peer Review. The report presents an overview of the goals and activities under each technology program area, a summary of project scores for each program, and a brief analysis of general evaluation trends within each program area or its constituent subprograms.

  1. The non-technical side of office technology

    NARCIS (Netherlands)

    Ruel, Hubertus Johannes Maria

    2001-01-01

    Many office technology projects fail. The outcomes of these projects are often not in line with initial expectations. This book assumes that this disappointing result is largely the result of the fact that office technology projects are too IT-driven. The basic assumption is that the problems

  2. Badge Office Process Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Haurykiewicz, John Paul [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Dinehart, Timothy Grant [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Parker, Robert Young [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-05-12

    The purpose of this process analysis was to analyze the Badge Offices’ current processes from a systems perspective and consider ways of pursuing objectives set forth by SEC-PS, namely increased customer flow (throughput) and reduced customer wait times. Information for the analysis was gathered for the project primarily through Badge Office Subject Matter Experts (SMEs), and in-person observation of prevailing processes. Using the information gathered, a process simulation model was constructed to represent current operations and allow assessment of potential process changes relative to factors mentioned previously. The overall purpose of the analysis was to provide SEC-PS management with information and recommendations to serve as a basis for additional focused study and areas for potential process improvements in the future.

  3. INEL Sample Management Office

    International Nuclear Information System (INIS)

    Watkins, C.

    1994-01-01

    The Idaho National Engineering Laboratory (INEL) Sample Management Office (SMO) was formed as part of the EG ampersand G Idaho Environmental Restoration Program (ERP) in June, 1990. Since then, the SMO has been recognized and sought out by other prime contractors and programs at the INEL. Since December 1991, the DOE-ID Division Directors for the Environmental Restoration Division and Waste Management Division supported the expansion of the INEL ERP SMO into the INEL site wide SMO. The INEL SMO serves as a point of contact for multiple environmental analytical chemistry and laboratory issues (e.g., capacity, capability). The SMO chemists work with project managers during planning to help develop data quality objectives, select appropriate analytical methods, identify special analytical services needs, identify a source for the services, and ensure that requirements for sampling and analysis (e.g., preservations, sample volumes) are clear and technically accurate. The SMO chemists also prepare work scope statements for the laboratories performing the analyses

  4. Fermilab Education Office - FAQ

    Science.gov (United States)

    Search The Education Office FAQ - Frequently Asked Questions Click on the question to see the answer and the difference between the Education Office and the Lederman Science Center? The Education Office is store selling logo items and science toys. The Education Office staff works on both the 15th floor of

  5. O mundo de Ronald McDonald: sobre a marca publicitária e a socialidade midiática The world of Ronald McDonald: on the trademark and the mediatic sociality

    Directory of Open Access Journals (Sweden)

    Isleide Arruda Fontenelle

    2002-06-01

    Full Text Available O palhaço Ronald McDonald -- uma das imagens de marca da Corporação McDonald's -- é tomado como paradigma para pensarmos as relações entre mercado, mídia e entretenimento, as quais tem uma ligação direta com o que estamos conceituando como "socialidade midiática". Enquanto uma metáfora ideal de uma propaganda que parece não querer mais fazer sentido, a história do palhaço nos permite desvendar os sentidos contidos em duas das principais práticas do marketing moderno, a propaganda e a publicidade, revelando-nos como, entre o nonsense da propaganda contemporânea e uma publicidade que fundiu realidade e ilusão, há uma relação visceral entre mídia e publicidade, que estabelece uma nova forma de comunicação, na qual o sujeito torna-se apenas um meio para fins que ele sabe quais são, mas, paradoxalmente, age como se não soubesse. Tal paradoxo é revelador de uma forma de subjetividade profundamente marcada pela mídia enquanto agente socializador, na medida em que a atuação da mídia como mediador da socialidade contemporânea acabou por alterar o nosso universo perceptivo, saturando o nosso imaginário de uma forma radicalmente nova. Some-se a isso o fato de que a "socialidade midiática" implica uma nova forma de representação do sujeito no registro do "espetáculo", no sentido de que "estar na imagem é existir". Desnecessário dizer o quanto essas questões precisam ser contempladas pelos estudos contemporâneos sobre os processos de socialização e o quanto são desafiadoras para aqueles que atuam no universo da educação.The clown Ronald McDonald -- one of the trademarks of the McDonald's Corporation -- is taken as a paradigm to reflect upon the relations between market, media, and entertainment, which have a direct link with what we define as "mediatic sociality". As an ideal metaphor of an advertising that no longer seems to attempt to make sense, the story of the clown allows us to unveil the meanings contained

  6. Office 365 For Dummies

    CERN Document Server

    Withee, Ken

    2012-01-01

    The information you need to create a virtual office that can be accessed anywhere Microsoft Office 365 is a revolutionary technology that allows individuals and companies of all sizes to create and maintain a virtual office in the cloud. Featuring familiar Office Professional applications, web apps, Exchange Online, and Lync Online, Office 365 offers business professionals added flexibility and an easy way to work on the go. This friendly guide explains the cloud, how Office 365 takes advantage of it, how to use the various components, and the many possibilities offered by Office 365. It provi

  7. Geothermal Technologies Office 2012 Peer Review Report

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2013-04-01

    On May 7-10, 2012, the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, Geothermal Technologies Office conducted its annual program peer review in Westminster, CO. In accordance with the EERE Peer Review Guide, the review provides an independent, expert evaluation of the strategic goals and direction of the office and is a forum for feedback and recommendations on future office planning. The purpose of the review was to evaluate DOE-funded projects for their contribution to the mission and goals of the office and to assess progress made against stated objectives. Project scoring results, expert reviewer comments, and key findings and recommendations are included in this report.

  8. Mirror Confinement Systems: project summaries

    International Nuclear Information System (INIS)

    1980-07-01

    This report contains descriptions of the projects supported by the Mirror Confinement Systems (MCS) Division of the Office of Fusion Energy. The individual project summaries were prepared by the principal investigators, in collaboration with MCS staff office, and include objectives and milestones for each project. In addition to project summaries, statements of Division objectives and budget summaries are also provided

  9. 5 June 2013 - European Union Ambassador to Switzerland and the Principality of Liechtenstein R. Jones in the ATLAS cavern with ATLAS Collaboration Deputy Spokesperson T. Wengler, in the LHC tunnel at Point 1 with Technology Department Head F. Bordry and signing the guest book with Director-General R. Heuer. Head of the EU Projects Office S. Stavrev present.

    CERN Multimedia

    Jean-Claude Gadmer

    2013-01-01

    5 June 2013 - European Union Ambassador to Switzerland and the Principality of Liechtenstein R. Jones in the ATLAS cavern with ATLAS Collaboration Deputy Spokesperson T. Wengler, in the LHC tunnel at Point 1 with Technology Department Head F. Bordry and signing the guest book with Director-General R. Heuer. Head of the EU Projects Office S. Stavrev present.

  10. 27 February 2012 - Director of the Health Directorate at the Research DG European Commission R. Draghia-Akli in the ATLAS visitor centre with ATLAS Former Collaboration Spokesperson P. Jenni and Head of CERN EU Projects Office S. Stavrev; in the LHC superconducting magnet test hall with E. Todesco; and signing the guest book with CERN Director-General R. Heuer.

    CERN Multimedia

    Michel Blanc

    2012-01-01

    27 February 2012 - Director of the Health Directorate at the Research DG European Commission R. Draghia-Akli in the ATLAS visitor centre with ATLAS Former Collaboration Spokesperson P. Jenni and Head of CERN EU Projects Office S. Stavrev; in the LHC superconducting magnet test hall with E. Todesco; and signing the guest book with CERN Director-General R. Heuer.

  11. Project and Partnership Officer | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Job Summary Within the Partnership and Business Development Division led by ... Collaborates in developing and writing proposals for donors;; Participates in ... contracts and grant letters, materiel purchases, travel arrangements, analysis of ...

  12. Chief, Project Management Office | IDRC - International ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Conduct strategic, risk and contingency planning analysis as well as ensure ... Ensure risk and contingency awareness and training for relevant employees, .... Sign up now for IDRC news and views sent directly to your inbox each month.

  13. EBFA project

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    An engineering project office was established during the fall of 1976 to manage and coordinate all of the activities of the Electron Beam Fusion Project. The goal of the project is to develop the Electron Beam Fusion Accelerator (EBFA) and its supporting systems, and integrate these systems into the new Electron Beam Fusion Facility (EBFF). Supporting systems for EBFA include a control/monitor system, a data acquistion/automatic data processing system, the liquid transfer systems, the insulating gas transfer systems, etc. Engineers and technicians were assigned to the project office to carry out the engineering design, initiate procurement, monitor the fabrication, perform the assembly and to assist the pulsed power research group in the activation of the EBFA

  14. Smart and Sustainable Offices (SSO: Showcasing a holistic approach to realise the next generation offices

    Directory of Open Access Journals (Sweden)

    A. Cobaleda Cordero

    2018-01-01

    Full Text Available The Smart Sustainable Offices project (SSO is a product of years of research with large sets of data collected from more than 30 office buildings in Switzerland, Sweden, and Spain. Based on scientific evidence, the concept of SSO, initially conceived as a research plan to address the interdependencies between office users and their working environment in a European context, is now used as a qualitative and quantitative mixed method approach for office diagnosis and ideation. At the current stage, the SSO methodology aims to implement a new paradigm of user-oriented, lower carbon footprint and resilient office design solutions. The main strategy is articulated around the “office DNA” of every organisation, decoded as a compound of work patterns, operational and individual needs, and their potential to define design criteria. The practical application of SSO and its tentative findings exemplified through three pilot test office-demonstrators are described in this paper.

  15. Renovating Interior Office Space: What a Manager Needs To Consider.

    Science.gov (United States)

    Babey, Evelyn R.

    When planning an office renovation, a manager should design an office layout that is efficient and should consider the psychological aspects of office design, including sound level, color harmony, and lighting. The manager must also have a good understanding of all phases of the project plan and the timing involved. There are basically five phases…

  16. 33 CFR 211.22 - Real estate Claims Officers.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Real estate Claims Officers. 211..., DEPARTMENT OF DEFENSE REAL ESTATE ACTIVITIES OF THE CORPS OF ENGINEERS IN CONNECTION WITH CIVIL WORKS PROJECTS Real Estate Claims § 211.22 Real estate Claims Officers. In each Division Office the Division...

  17. Modeling of Core Competencies in the Registrar's Office

    Science.gov (United States)

    Pikowsky, Reta

    2009-01-01

    The Office of the Registrar at the Georgia Institute of Technology, in cooperation with the Office of Human Resources, has been engaged since February 2008 in a pilot project to model core competencies for the leadership team and the staff. It is the hope of the office of Human resources that this pilot will result in a model that can be used…

  18. La igualdad de recursos de Ronald Dworkin: ¿una concepción fallida? | Dworkin’s Equality of Resources, a failed account?

    Directory of Open Access Journals (Sweden)

    Jahel Queralt Lange

    2014-12-01

    Abstract: This article examines Ronald Dworkin’s equality of resources. It claims that his proposal is successful in showing that, rightly understood, individual responsibility justifies a generous welfare state. He fails, however, in identifying the institutions capable of satisfying its principles. Dworkin does not address correctly the objections that question the capacity of his account to generate distributive outcomes that are responsibility-sensitive and circumstance-insensitive. His answer makes the success of the implementation of his account dependent on circumstances that are contingent and, hence, might not obtain in our societies.

  19. NOAA Workforce Management Office

    Science.gov (United States)

    Management Fellows (PMFs) Program Coordination Office - Leadership Development Program (PCO-LDP) Employee (NRAP) Presidential Management Fellows (PMFs) Program Coordination Office - Leadership Development ) NOAA Leadership Seminar (NLS) NOAA Rotational Assignment Program (NRAP) Presidential Management Fellows

  20. HUD's Local Office Directory

    Data.gov (United States)

    Department of Housing and Urban Development — HUD is organized in 10 Regions. Each Region is managed by a Regional Administrator, who also oversees the Regional Office. Each Field Office within a Region is...

  1. Fermilab Education Office - Contacts

    Science.gov (United States)

    Search The Office of Education and Public Outreach: Contacts All telephone numbers require area code Presentations for Presenters 840-3094 Office of Education and Public Outreach Spencer Pasero spasero@fnal.gov Education Office 840-3076 Fermilab Friends for Science Education General Questions Susan Dahl sdahl@fnal.gov

  2. Fermilab Education Office - Physicists

    Science.gov (United States)

    on Education Server, but to take full advantage of all of this site's features, you should turn Custom Search Connect with the Fermilab Education Office! Facebook Fermilab Education Office Join these groups: Science Adventures Group Teacher Resource Center Group Twitter Fermilab Education Office For more

  3. Office Computers: Ergonomic Considerations.

    Science.gov (United States)

    Ganus, Susannah

    1984-01-01

    Each new report of the office automation market indicates technology is overrunning the office. The impacts of this technology are described and some ways to manage and physically "soften" the change to a computer-based office environment are suggested. (Author/MLW)

  4. Research activities in radiation protection. Programme report 1997. Report on the departmental research programme of the Federal Ministry for Environment, Nature Conservation and Reactor Safety (BMU), performed under the scientific and administrative project management of the Federal Office for Radiation Protection (BfS)

    International Nuclear Information System (INIS)

    Schmitt-Hannig, A.; Goedde, R.; Thieme, M.

    1998-03-01

    On behalf of the Federal Ministry for Environment, Nature Conservation and Nuclear Safety (BMU), the Federal Office for Radiation Protection (BfS) is placing research and study contracts in the field of radiation protection. The results of these projects are used for developing radiation protection rules and to fulfill the special radiation protection tasks of the BMU, required by law. Planning, expert and administrative management, placing, assistance as well as expert evaluation of the results from these research projects lies within the responsibility of the Federal Office for Radiation Protection. This report provides information on preliminary and final results of radiation protection projects within the BMU Departmental Research Programme of the year 1997. (orig.) [de

  5. Office 2013 simplified

    CERN Document Server

    Marmel, Elaine

    2013-01-01

    A basic introduction to learn Office 2013 quickly, easily, and in full color Office 2013 has new features and tools to master, and whether you're upgrading from an earlier version or using the Office applications for the first time, you'll appreciate this simplified approach. Offering a clear, visual style of learning, this book provides you with concise, step-by-step instructions and full-color screen shots that walk you through the applications in the Microsoft Office 2013 suite: Word, Excel, PowerPoint, Outlook, and Publisher.Shows you how to tackle dozens of Office 2013

  6. Office 2013 for dummies

    CERN Document Server

    Wang, Wallace

    2013-01-01

    Office 2013 For Dummies is the key to your brand new Office! Packed with straightforward, friendly instruction, this update to one of the bestselling Office books of all time gets you thoroughly up to speed and helps you learn how to take full advantage of the new features in Office 2013. After coverage of the fundamentals, you'll discover how to spice up your Word documents, edit Excel spreadsheets and create formulas, add pizazz to your PowerPoint presentation, and much more.Helps you harness the power of all five Office 2013 applications: Word, Excel, PowerPoint,

  7. R.M.S Titanic 2004 Expedition on the NOAA Ship Ronald H. Brown between 20040527 and 20040612

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — In collaboration with the National Oceanic and Atmospheric Administration?s (NOAA) Office of Ocean Exploration (OE), the Institute for Exploration (IFE) requests...

  8. Pacific Northwest Laboratory annual report for 1985 to the DOE Office of the Assistant Secretary for Environment, Safety and Health. Part 5. Overview and assessment

    International Nuclear Information System (INIS)

    Faust, L.G.

    1986-02-01

    This volume is progress on work performed for the Office of Nuclear Safety, the Office of Operational Safety, and for the Office of Environmental Analysis for each project. Separate abstracts have been prepared for individual projects. ACR

  9. The Professor and the Student, Sir Ronald Aylmer Fisher (1890-1962) and William Sealy Gosset (1876-1937): Careers of two giants in mathematical statistics.

    Science.gov (United States)

    Vyas, Shreena A; Desai, Sukumar P

    2015-05-01

    Sir Ronald Aylmer Fisher and William Sealy Gosset were responsible for laying the foundations of statistical inference. Tests that bear their names are used by students and researchers in a wide variety of scientific disciplines. Similar and different in many respects, their lives and careers are the subject of this essay. They were not teacher and pupil; in fact the student was 14 years older than the professor. Their careers did not require them to interact with one another much but they were aware of one another's work. Although Sir Ronald is assigned the role of the professor, his success as a teacher was impaired by his inability to understand the limitations of his students. Meanwhile Gosset was forced to publish his work under the pseudonym 'Student' in order to make contributions to the field of mathematical statistics. Both men are undisputed giants in the field of statistics and we celebrate their achievements as much as we try to understand their struggles. © The Author(s) 2015 Reprints and permissions: sagepub.co.uk/journalsPermissions.nav.

  10. Ronald Reagan's Economic Jeremiad.

    Science.gov (United States)

    Johannesen, Richard L.

    1986-01-01

    Considers President Reagan's address to the nation on February 5, 1981, concerning the state of the economy, as a contemporary secular version of the jeremiad, a rhetorical form that has persisted in America since colonial times. Describes Reagan's skillful use of the genre to motivate public response to what he viewed as an economic crisis. (NKA)

  11. Energy use in office buildings

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-01

    This is the report on Task IB, Familiarization with Additional Data Collection Plans of Annual Survey of BOMA Member and Non-Member Buildings in 20 Cities, of the Energy Use in Office Buildings project. The purpose of the work was to monitor and understand the efforts of the Building Owners and Managers Association International (BOMA) in gathering an energy-use-oriented data base. In order to obtain an improved data base encompassing a broad spectrum of office space and with information suitable for energy analysis in greater detail than is currently available, BOMA undertook a major data-collection effort. Based on a consideration of geographic area, climate, population, and availability of data, BOMA selected twenty cities for data collection. BOMA listed all of the major office space - buildings in excess of 40,000 square feet - in each of the cities. Tax-assessment records, local maps, Chamber of Commerce data, recent industrial-development programs, results of related studies, and local-realtor input were used in an effort to assemble a comprehensive office-building inventory. In order to verify the accuracy and completeness of the building lists, BOMA assembled an Ad-Hoc Review Committee in each city to review the assembled inventory of space. A questionnaire on office-building energy use and building characteristics was developed. In each city BOMA assembled a data collection team operating under the supervision of its regional affiliate to gather the data. For each city a random sample of buildings was selected, and data were gathered. Responses for over 1000 buildings were obtained.

  12. Stratus Ocean Reference Station (20 degs S, 85 degs W) Mooring Recovery and Deployment Cruise, STRATUS 8, R/V Ronald H. Brown Cruise 07-09, October 9, 2007-November 6, 2007

    National Research Council Canada - National Science Library

    Whelan, Sean; Lord, Jeff; Grados, Carmen; Yu, Lisan; Morales, Luis; Galbraith, Nancy; de Szoeke, Simon P; O'Leary, Megan; Weller, Robert; Bouchard, Paul

    2007-01-01

    .... During the October 2007 cruise on the NOAA ship Ronald H. Brown to the ORS Stratus site, the primary activities were recovery of the Stratus 7 WHOI surface mooring that had been deployed in October 2006, deployment of a new (Stratus...

  13. Practical tips for dealing with office construction and repair.

    Science.gov (United States)

    Hills, Laura Sachs

    2008-01-01

    Many medical practices embark on a large office construction project sooner or later. When they do, the medical practice staff often finds itself up to its eyeballs in dust, debris, and confusion. This article suggests practical strategies for the medical practice staff to help employees cope with the inevitable challenges before, during, and after an office construction project. It suggests a strategy for a staff kick-off meeting and for establishing staff to-do lists throughout the project. It offers 10 practical staff strategies before the project begins including doing preparatory work with patients and neighbors and establishing a chain of communication. The article also offers tips for ensuring safety during office construction and ways to use a construction project as a springboard for goodwill-building and practice-marketing activities. Finally, this article offers advice about maintaining the daily schedule of the practice during a large-scale office construction project.

  14. MRS project management

    International Nuclear Information System (INIS)

    Doman, J.W.; Vlahakis, J.

    1992-01-01

    Management of projects under the control of the Office of Civilian Radioactive Waste Management within the Department of Energy is subject to overview by a variety of internal and external entities. This paper reports that effective project management often requires balancing of conflicting directions and conflicting agendas of the different entities in order to proceed with implementation of the Monitored Retrievable Storage project

  15. A Few Considerations on the Role of the President Ronald Reagan in the Collapse of the Communism and the End of the Cold War

    Directory of Open Access Journals (Sweden)

    Hadrian Gorun

    2014-06-01

    Full Text Available This short analysis tries to emphasize Ronald Reagan’s role to the collapse of Communist system in Central and Eastern Europe. During his first years as president, he took a hard line against Soviet Union. He described this superpower as „Evil Empire’’, suporting all anti-Communist movements from all over the world. Since 1985, a new era of American-Soviet relations has just begun. Reagan and Gorbachev held four summit conferences between 1985 and 1988: the first in Geneva, Switzerland, the second in Reykjavík, Iceland, the third in Washington, D.C., and the fourth in Moscow. Reagan believed that if he could persuade the Soviets to allow for more democracy and free speech, this would lead to the end of the Cold War and to the end of the Communist system.

  16. Tracking discourse complexity preceding Alzheimer's disease diagnosis: a case study comparing the press conferences of Presidents Ronald Reagan and George Herbert Walker Bush.

    Science.gov (United States)

    Berisha, Visar; Wang, Shuai; LaCross, Amy; Liss, Julie

    2015-01-01

    Changes in some lexical features of language have been associated with the onset and progression of Alzheimer's disease. Here we describe a method to extract key features from discourse transcripts, which we evaluated on non-scripted news conferences from President Ronald Reagan, who was diagnosed with Alzheimer's disease in 1994, and President George Herbert Walker Bush, who has no known diagnosis of Alzheimer's disease. Key word counts previously associated with cognitive decline in Alzheimer's disease were extracted and regression analyses were conducted. President Reagan showed a significant reduction in the number of unique words over time and a significant increase in conversational fillers and non-specific nouns over time. There was no significant trend in these features for President Bush.

  17. TRATAMIENTO DOCTRINAL DE LA OBJECIÓN DE CONCIENCIA Y LA DESOBEDIENCIA CIVIL EN RONALD DWORKIN Y JÜRGEN HABERMAS.

    Directory of Open Access Journals (Sweden)

    Martha Elena Soto Obregón

    2013-05-01

    Full Text Available Las figuras de objeción de conciencia (OC y desobediencia civil (DC han sido estudiadas por diversos autores, pero muchos de ellos siempre acuden a los mismos referentes teóricos: “autores frontera” que estudian dichas figuras tangencialmente al cobijo de sus tesis fundamentales y que se convierten en referencia obligada -clásicos- para posteriores investigaciones. Esta situación es propia de la aplicación del principio de saturación. El objetivo de este ensayo es tomar a uno de esos autores frontera (Ronald Dworkin y Jürgen Habermas, y analizar a profundidad el ADN de la OC y de la DC y al mismo tiempo discutir con el autor respecto de la aplicación de sus premisas.

  18. 2016 Building Technologies Office Peer Review Report

    Energy Technology Data Exchange (ETDEWEB)

    Building Technologies Office

    2016-12-01

    The 2016 Building Technologies Office Peer Review Report summarizes the feedback submitted by reviewers of the 67 BTO projects presented at the 2016 BTO Peer Review. The report presents an overview of the goals and activities under each technology program area, a summary of project scores for each program, and a brief analysis of general evaluation trends within each program area or its constituent subprograms.

  19. The Veteran Population Projection 2014

    Data.gov (United States)

    Department of Veterans Affairs — VetPop2014 is an actuarial projection model developed by the Office of the Actuary (OACT) for Veteran population projection from Fiscal Year FY2014 to FY2043. Using...

  20. Office 2013 digital classroom

    CERN Document Server

    Holland, Walter

    2013-01-01

    This complete training package makes learning the new Office 2013 even easier! Featuring both a video training DVD and a full-color book, this training package is like having your own personal instructor guiding you through each lesson of learning Office 2013, all while you work at your own pace. The self-paced lessons allow you to discover the new features and capabilities of the new Office suite. Each lesson includes step-by-step instructions and lesson files, and provides valuable video tutorials that complement what you're learning and clearly demonstrate how to do tasks. This essential

  1. Office 2010 Bible

    CERN Document Server

    Walkenbach, John; Groh, Michael R

    2010-01-01

    The best of the best from the bestselling authors of Excel, Word, and PowerPoint Bibles !. Take your pick of applications from the Office 2010 suite and your choice of leading experts to show you how to use them. This Office 2010 Bible features the best-of-the-best content from the Excel 2010 Bible , by "Mr. Spreadsheet" John Walkenbach; the Word 2010 Bible by Microsoft MVP Herb Tyson; the PowerPoint 2010 Bible , by PowerPoint expert Faithe Wempen; and coverage of Access 2010 from Microsoft MVP Michael Alexander. If you want to quickly and effectively begin using Office 2010, start i

  2. Programs of the Office of Energy Research

    International Nuclear Information System (INIS)

    1986-04-01

    The programs of the Office of Energy Research, DOE, include several thousand individual projects and hundreds of laboratories, universities, and other research facilities throughout the United States. The major programs and activities are described briefly, and include high energy and nuclear physics, fusion energy, basic energy sciences, and health and environmental research, as well as advisory, assessment, support, and scientific computing activities

  3. Interministerial Order No. 6498/89 of 28 November 1989 creating renewable Financing Account attached to the Directorate of Waters and Forests and the Provincial Offices of Waters and Forests concerned with the project Management and Protection of Forests.

    Science.gov (United States)

    1989-01-01

    This Madagascar Order creates a Renewable Financing Account to finance the activities of the Management and Protection of Forests project. The Account is to pay the expenses of the project in sums set out in the Order for the various parts of the project. Further provisions of the Decree describe the duties of the manager of the Account.

  4. Features interior design offices

    OpenAIRE

    Novikov, A. S.; National Aviation University, Ukraine

    2014-01-01

    The article examines the laws and the formation of office space inthe current conditions and investigate the application of the latest technical tools aesthetics to improve the quality of design solutions.

  5. Planning for Office Automation.

    Science.gov (United States)

    Mick, Colin K.

    1983-01-01

    Outlines a practical approach to planning for office automation termed the "Focused Process Approach" (the "what" phase, "how" phase, "doing" phase) which is a synthesis of the problem-solving and participatory planning approaches. Thirteen references are provided. (EJS)

  6. NCEP Internal Office Notes

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The National Centers for Environmental Prediction (NCEP) and its predecessors have produced internal publications, known as Office Notes, since the mid-1950's. In...

  7. Ecocitizen at the office

    CERN Multimedia

    Staff Association

    2014-01-01

    At the office, I do as I would at home At the office, just as at home, we need to stay warm, have light, be equipped (with office material, furniture). We thus need energy and raw materials. This consumption is not without consequences for our environment. How to reduce our consumption? In everyday life, we already have behaviours that allow us to save energy and resources, to sort our waste. At the office it is important to act in the same way as at home, as we spend a lot of time at our workplace. How to act more responsibly at the office, to reduce the environmental impact, and how to stay motivated? Computer, printer, copy machine… or coffee machine. There are quite a few electrical appliances which are indispensable in our office. Always turned on, or almost, they are also often inactive, and it is during these phases of inactivity that two thirds of their consumption occurs. The way one uses the computer is important in order to limit its consumption. Use the sleep mode with care. A c...

  8. Partial pressure (or fugacity) of carbon dioxide, salinity and other variables collected from Surface underway observations using Barometric pressure sensor, Carbon dioxide (CO2) gas analyzer and other instruments from NOAA Ship RONALD H. BROWN in the Caribbean Sea, Coastal Waters of Florida and others from 2006-02-16 to 2006-12-02 (NODC Accession 0081021)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0081021 includes Surface underway, chemical, meteorological, optical and physical data collected from NOAA Ship RONALD H. BROWN in the Caribbean Sea,...

  9. Partial pressure (or fugacity) of carbon dioxide, dissolved inorganic carbon, pH, alkalinity, temperature, salinity and other variables collected from discrete sample and profile observations using Alkalinity titrator, CTD and other instruments from NOAA Ship RONALD H. BROWN in the North Atlantic Ocean from 1998-01-24 to 1998-02-23 (NODC Accession 0113920)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0113920 includes chemical, discrete sample, physical and profile data collected from NOAA Ship RONALD H. BROWN in the North Atlantic Ocean from...

  10. Partial pressure (or fugacity) of carbon dioxide, salinity and other variables collected from Surface underway observations using Barometric pressure sensor, Carbon dioxide (CO2) gas analyzer and other instruments from NOAA Ship RONALD H. BROWN in the Caribbean Sea, Coastal Waters of Florida and others from 2003-02-06 to 2003-11-21 (NODC Accession 0081017)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0081017 includes Surface underway, chemical, meteorological, optical and physical data collected from NOAA Ship RONALD H. BROWN in the Caribbean Sea,...

  11. Partial pressure (or fugacity) of carbon dioxide, salinity and other variables collected from Surface underway observations using Carbon dioxide (CO2) gas analyzer, Shower head chamber equilibrator for autonomous carbon dioxide (CO2) measurement and other instruments from NOAA Ship RONALD H. BROWN in the Arabian Sea, Arafura Sea and others from 1999-01-14 to 1999-12-02 (NODC Accession 0081013)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0081013 includes Surface underway, chemical and physical data collected from NOAA Ship RONALD H. BROWN in the Arabian Sea, Arafura Sea, Bay of Bengal,...

  12. Partial pressure (or fugacity) of carbon dioxide, dissolved inorganic carbon, pH, alkalinity, temperature, salinity and other variables collected from discrete sample and profile observations using Alkalinity titrator, CTD and other instruments from NOAA Ship RONALD H. BROWN in the North Atlantic Ocean and South Atlantic Ocean from 2003-06-04 to 2003-08-11 (NODC Accession 0108061)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0108061 includes discrete sample and profile data collected from NOAA Ship RONALD H. BROWN in the North Atlantic Ocean and South Atlantic Ocean from...

  13. Partial pressure (or fugacity) of carbon dioxide, dissolved inorganic carbon, pH, alkalinity, temperature, salinity and other variables collected from discrete sample and profile observations using Alkalinity titrator, CTD and other instruments from NOAA Ship RONALD H. BROWN in the North Pacific Ocean, South Pacific Ocean and Southern Oceans from 2007-12-15 to 2008-02-23 (NODC Accession 0109903)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0109903 includes discrete sample and profile data collected from NOAA Ship RONALD H. BROWN in the North Pacific Ocean, South Pacific Ocean and...

  14. Partial pressure (or fugacity) of carbon dioxide, dissolved inorganic carbon, pH, alkalinity, temperature, salinity and other variables collected from discrete sample and profile observations using Alkalinity titrator, CTD and other instruments from NOAA Ship RONALD H. BROWN in the North Atlantic Ocean and South Atlantic Ocean from 2010-03-08 to 2010-04-17 (NODC Accession 0108156)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0108156 includes chemical, discrete sample, physical and profile data collected from NOAA Ship RONALD H. BROWN in the North Atlantic Ocean and South...

  15. Partial pressure (or fugacity) of carbon dioxide, dissolved inorganic carbon, pH, alkalinity, temperature, salinity and other variables collected from discrete sample and profile observations using CTD, bottle and other instruments from NOAA Ship RONALD H. BROWN in the North Atlantic Ocean and South Atlantic Ocean from 2013-08-03 to 2013-10-01 (NCEI Accession 0157363)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0157363 includes chemical, discrete sample, physical and profile data collected from NOAA Ship RONALD H. BROWN in the North Atlantic Ocean and South...

  16. Partial pressure (or fugacity) of carbon dioxide, dissolved inorganic carbon, pH, alkalinity, temperature, salinity and other variables collected from discrete sample and profile observations using Alkalinity titrator, CTD and other instruments from NOAA Ship RONALD H. BROWN in the South Atlantic Ocean from 2011-09-26 to 2011-10-31 (NODC Accession 0109914)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0109914 includes discrete sample and profile data collected from NOAA Ship RONALD H. BROWN in the South Atlantic Ocean from 2011-09-26 to 2011-10-31....

  17. Carbon Dioxide, Hydrographic, and Chemical Data Obtained During NOAA Ship Ronald H. Brown Repeat Hydrography Cruises in the Pacific Ocean: GO-SHIP Section P16N_2015, Legs 1 and 2 (EXPOCODEs 33RO20150410 and 33RO20150525), (10 April - 27 June, 2015) (NCEI Accession 0163182)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0163182 includes chemical, discrete sample, physical and profile data collected from NOAA Ship RONALD H. BROWN in the Gulf of Alaska, North Pacific...

  18. Temperature and salinity profiles from CTD casts from NOAA Ship RONALD H. BROWN in the NE and SE Pacific as part of the East Pacific Investigations of Climate Processes in support of the Coupled Ocean-Atmosphere from 2001-09-05 to 2001-10-25 (NODC Accession 0000657)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — CTD and other data were collected from NOAA Ship RONALD H. BROWN in the NE and SE Pacific from 05 September 2001 to 25 October 2001. CTD data consist of temperature...

  19. Partial pressure (or fugacity) of carbon dioxide, temperature, salinity and other variables collected from surface underway observations using carbon dioxide gas analyzer, shower head equilibrator and other instruments from NOAA Ship Ronald H. Brown cruises RB1301 and RB1302 in the North Atlantic Ocean from 2013-01-08 to 2013-03-04 (NCEI Accession 0162200)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0162200 includes Surface underway, chemical, meteorological and physical data collected from NOAA Ship Ronald H. Brown Cruises RB1301 and RB1302 in...

  20. Partial pressure (or fugacity) of carbon dioxide, salinity and other variables collected from Surface underway observations using Barometric pressure sensor, Carbon dioxide (CO2) gas analyzer and other instruments from NOAA Ship RONALD H. BROWN in the North Atlantic Ocean and South Atlantic Ocean from 2013-07-18 to 2013-10-02 (NODC Accession 0117699)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NODC Accession 0117699 includes Surface underway, chemical, meteorological and physical data collected from NOAA Ship RONALD H. BROWN in the North Atlantic Ocean and...

  1. Partial pressure (or fugacity) of carbon dioxide, salinity and other variables collected from Surface underway observations using Barometric pressure sensor, Carbon dioxide (CO2) gas analyzer and other instruments from NOAA Ship RONALD H. BROWN in the Caribbean Sea, North Atlantic Ocean and South Atlantic Ocean from 2013-04-30 to 2013-12-07 (NODC Accession 0117689)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0117689 includes Surface underway, chemical, meteorological and physical data collected from NOAA Ship RONALD H. BROWN in the Caribbean Sea, North...

  2. Partial pressure (or fugacity) of carbon dioxide, salinity and other variables collected from Surface underway observations using Carbon dioxide (CO2) gas analyzer, Shower head chamber equilibrator for autonomous carbon dioxide (CO2) measurement and other instruments from NOAA Ship RONALD H. BROWN in the South Atlantic Ocean from 2013-12-23 to 2014-02-04 (NODC Accession 0116979)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NODC Accession 0116979 includes Surface underway, chemical, meteorological and physical data collected from NOAA Ship RONALD H. BROWN in the South Atlantic Ocean...

  3. Partial pressure (or fugacity) of carbon dioxide, salinity and other variables collected from Surface underway observations using Carbon dioxide (CO2) gas analyzer and other instruments from NOAA Ship RONALD H. BROWN in the Coastal Waters of Florida, Florida Keys National Marine Sanctuary and others from 2012-07-21 to 2012-08-13 (NCEI Accession 0157303)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0157303 includes Surface underway, chemical, meteorological and physical data collected from NOAA Ship RONALD H. BROWN in the Coastal Waters of...

  4. Partial pressure (or fugacity) of carbon dioxide, salinity and other variables collected from Surface underway observations using Carbon dioxide (CO2) gas analyzer and other instruments from NOAA Ship RONALD H. BROWN in the Arctic Ocean, Beaufort Sea and others from 2015-01-15 to 2015-12-18 (NCEI Accession 0157252)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0157252 includes Surface underway, chemical, meteorological and physical data collected from NOAA Ship RONALD H. BROWN in the Arctic Ocean, Beaufort...

  5. Partial pressure (or fugacity) of carbon dioxide, salinity and other variables collected from Surface underway observations using Barometric pressure sensor, Carbon dioxide (CO2) gas analyzer and other instruments from NOAA Ship RONALD H. BROWN in the Coastal Waters of Florida, North Atlantic Ocean and others from 2004-12-29 to 2005-11-25 (NODC Accession 0081020)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0081020 includes Surface underway, chemical, meteorological, optical and physical data collected from NOAA Ship RONALD H. BROWN in the Coastal Waters...

  6. Current meter components, physical, and other data from current meters and CTD casts from NOAA Ship RONALD H. BROWN and other platforms as part of the VENTS program from 1996-06-14 to 1997-10-05 (NODC Accession 9800031)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Current meter components and physical data were collected from current meters and CTD casts from NOAA Ship RONALD H. BROWN and other platforms from 14 June 1996 to...

  7. Partial pressure (or fugacity) of carbon dioxide, salinity and other variables collected from Surface underway observations using Barometric pressure sensor, Carbon dioxide (CO2) gas analyzer and other instruments from NOAA Ship RONALD H. BROWN in the Caribbean Sea, Coastal Waters of Florida and others from 2004-02-12 to 2004-12-22 (NODC Accession 0081018)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0081018 includes Surface underway, chemical, meteorological, optical and physical data collected from NOAA Ship RONALD H. BROWN in the Caribbean Sea,...

  8. 2013 Geothermal Technologies Office Peer Review Report

    Energy Technology Data Exchange (ETDEWEB)

    Geothermal Technologies Office

    2014-01-01

    Geothermal Technologies Office conducted its annual program peer review in April of 2013. The review provided an independent, expert evaluation of the technical progress and merit of GTO-funded projects. Further, the review was a forum for feedback and recommendations on future GTO strategic planning. During the course of the peer review, DOE-funded projects were evaluated for 1) their contribution to the mission and goals of the GTO and 2) their progress against stated project objectives. Principal Investigators (PIs) came together in sessions organized by topic “tracks” to disseminate information, progress, and results to a panel of independent experts as well as attendees.

  9. Advanced Energy Retrofit Guide Office Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Liu, Guopeng; Liu, Bing; Wang, Weimin; Zhang, Jian; Athalye, Rahul A.; Moser, Dave; Crowe, Eliot; Bengtson, Nick; Effinger, Mark; Webster, Lia; Hatten, Mike

    2011-09-27

    The Advanced Energy Retrofit Guide for Office Buildings is a component of the Department of Energy’s Advanced Energy Retrofit Guides for Existing Buildings series. The aim of the guides is to facilitate a rapid escalation in the number of energy efficiency projects in existing buildings and to enhance the quality and depth of those projects. By presenting general project planning guidance as well as financial payback metrics for the most common energy efficiency measures, these guides provide a practical roadmap to effectively planning and implementing performance improvements for existing buildings.

  10. Report made on behalf of the commission of foreign affairs about the project of law, adopted by the Senate, giving permission to the approval of the agreement between the French government and the international organization for thermonuclear fusion energy ITER, relative to the head office of ITER organization and to the privileges and immunities of ITER organization in the French territory

    International Nuclear Information System (INIS)

    2008-02-01

    The will of building up an international thermonuclear experimental reactor (ITER) gathers since several years the European community of atomic energy (Euratom), Japan, the USA, and Russia, next followed by China, South Korea and, since 2005, by India. The agreement signed in Paris between these seven parties on November 21, 2006 entrusted the international organization ITER with the realization of this project. The implications of the ITER project are enormous both in their scientific and in their economical aspects. France has a particular position in this project since the head office of ITER organisation is sited at Saint-Paul-lez-Durance and the tokamak will be built at Cadarache. Therefore, an agreement has been signed between ITER organization and the French government. The approval of this agreement is the object of this project of law. The document presents first the principle, challenge and stakes of the ITER project and the long negotiations that have led to chose France for the setting up of the research facility. Then, it presents the agreement of November 7, 2007, which fixes the general framework of the conditions necessary to the achievement of the project. The agreement comprises the classical rules, privileges and immunities of any international organization sited on the French ground, plus some more specific dispositions in particular in the domain of management of the wastes generated by the facility. (J.S.)

  11. Superconducting Technology Assessment (NSA, Office of Corporate Assessments)

    Data.gov (United States)

    Networking and Information Technology Research and Development, Executive Office of the President — The government, and particularly NSA, has a continuing need for ever-increasing computational power. The Agency is concerned about projected limitations of...

  12. A Study of Curriculum Development: Wing Squadron Officer Course

    National Research Council Canada - National Science Library

    Brown, Kerk

    2001-01-01

    .... The purpose of this research project is to determine the appropriate curriculum to best address the gap currently existing within the Air Force officer Continuum of Education between the Aerospace Basic Course (ABC...

  13. ARRA NEPA Quarterly Report- Second Report: DHHS: Office of Secretary

    Data.gov (United States)

    Council on Environmental Quality, Executive Office of the President — Reports prepared by the Departments and Agencies on status of NEPA progress for activities and projects funded under Division A of the American Recovery and...

  14. Instructed officers Radiation Protection

    International Nuclear Information System (INIS)

    2007-01-01

    This law contains instructions on the prevention of radiological and contains 4 articles Article I: describe the responsibilities of the institutions that operate within the scope of radiological protection in terms of the number of radiation protection officers and personal Supervisors who available in the practices radiation field. Article II: talking about the conditions of radiation protection officers that must be available in the main officers and working field in larg institutions and thecondition of specific requirements for large enterprises of work permits in the field of radiological work that issued by the Council. Article III: the functions and duties of officers in the prevention of radiological oversee the development of radiation protection programmes in the planning stages, construction and preparing the rules of local labour and what it lead of such tasks.Article IV: radiation protection officers powers: to modify and approve the programme of prevention and radiation safety at the company, stop any unsafe steps, amend the steps of the usage, operation of materials, devices and so on

  15. VIP visit of LHC Computing Grid Project

    CERN Multimedia

    Krajewski, Yann Tadeusz

    2015-01-01

    VIP visit of LHC Computing Grid Project with Dr -.Ing. Tarek Kamel [Senior Advisor to the President for Government Engagement, ICANN Geneva Office] and Dr Nigel Hickson [VP, IGO Engagement, ICANN Geneva Office

  16. The strategic security officer.

    Science.gov (United States)

    Hodges, Charles

    2014-01-01

    This article discusses the concept of the strategic security officer, and the potential that it brings to the healthcare security operational environment. The author believes that training and development, along with strict hiring practices, can enable a security department to reach a new level of professionalism, proficiency and efficiency. The strategic officer for healthcare security is adapted from the "strategic corporal" concept of US Marine Corps General Charles C. Krulak which focuses on understanding the total force implications of the decisions made by the lowest level leaders within the Corps (Krulak, 1999). This article focuses on the strategic organizational implications of every security officer's decisions in the constantly changing and increasingly volatile operational environment of healthcare security.

  17. Nuclear security officer training

    International Nuclear Information System (INIS)

    Harrington, W.F.

    1981-01-01

    Training has become complex and precise in today's world of critical review and responsibility. Entrusted to a security officer is the success or demise of large business. In more critical environments the security officer is entrusted with the monitoring and protection of life sensitive systems and devices. The awareness of this high visibility training requirement has been addressed by a limited few. Those involved in the nuclear power industry through dedication and commitment to the American public have without a doubt become leading pioneers in demanding training excellence

  18. Plan de negocios para la constitución de una empresa consultora que preste los servicios de asesoría para la planeación estratégica de organizaciones y la gerencia de proyectos implementando la metodología PMI - JYJ Project Offices S.A.S.

    OpenAIRE

    Contreras Delgadillo, Yair Esteban; Noriega Silva, Juan Carlos; Benítez Granados, John

    2012-01-01

    El presente documento describe el plan de negocio para la creación de una empresa de consultoría que asesore, forme las capacidades humanas y acompañe a medianas y grandes empresas de los sectores de Hidrocarburos (Petróleo), Construcción, Obras civiles y Telecomunicaciones, en la gestión de proyectos, creación de Oficinas de Proyectos con enfoque PMI y planeación estratégica. Esta empresa cuya razón social será JYJ Project Offices S.A.S., ofrecerá sus servicios a empresas localizadas en la ...

  19. Carbon Dioxide, Hydrographic, and Chemical Data Obtained During the R/V Ronald H. Brown Repeat Hydrography Cruise in the Atlantic Ocean: CLIVAR CO2 Section A16S_2005 (11 January - 24 February, 2005)

    Energy Technology Data Exchange (ETDEWEB)

    Kozyr, Alex [Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States). Carbon Dioxide Information Analysis Center

    2006-08-30

    This report presents methods, and analytical and quality control procedures for salinity, oxygen, nutrient, inorganic carbon, organic carbon, chlorofluorocarbon (CFC), and bomb 14C system parameters performed during the A16S_2005 cruise, which took place from January 11 to February 24, 2005, aboard research vessel (R/V) Ronald H. Brown under the auspices of the National Oceanic and Atmospheric Administration (NOAA). The R/V Ronald H. Brown departed Punta Arenas, Chile, on January 11, 2005, and ended its cruise in Fortaleza, Brazil, on February 24, 2005. The research conducted was one of a series of repeat hydrography sections jointly funded by NOAA and the National Science Foundation as part of the CLIVAR/CO2/repeat hydrography/tracer program. Samples were taken from 36 depths at 121 stations. The data presented in this report include the analyses of water samples for total inorganic carbon (TCO2), fugacity of CO2 (fCO2), total alkalinity (TALK), pH, dissolved organic carbon (DOC), CFC, 14C, hydrographic, and other chemical measurements. The R/V Ronald H. Brown A16S_2005 data set is available free of charge as a numeric data package (NDP) from the Carbon Dioxide Information Analysis Center (CDIAC). The NDP consists of the oceanographic data files and this printed documentation, which describes the procedures and methods used to obtain the data.

  20. An Admissions Officer's Credentials

    Science.gov (United States)

    Chronicle of Higher Education, 2007

    2007-01-01

    Marilee Jones has resigned as a dean of admissions at the Massachusetts Institute of Technology after admitting that she had misrepresented her academic degrees when first applying to work at the university in 1979. As one of the nation's most prominent admissions officers--and a leader in the movement to make the application process less…

  1. ERGONOMIC OFFICE POSITION ANALYSIS

    Directory of Open Access Journals (Sweden)

    DUMITRU Bogdan

    2010-07-01

    Full Text Available This paper present the risks faced by people working in the office. In the next pages you will find some methods and suggestions how to prevent the appearance of occupational diseases. These suggestions can help anyone to rearrange his work place in order to make his job more pleasant and healthy.

  2. The Mindful Development Officer

    Science.gov (United States)

    Taft, Deb

    2012-01-01

    Delivering on a commitment to diversity in schools, colleges, and universities is a living, breathing endeavor for many members of the advancement community. While a diversity leadership agenda is set clearly from the top, advancement officers can and must play a critical role in this arena. Effective development and alumni leaders are uniquely…

  3. Office of the Ombudsman.

    Science.gov (United States)

    Office of Federal Student Aid (ED), Washington, DC.

    This pamphlet describes the Federal Student Aid Ombudsman, an impartial resource to help customers resolve student loan concerns when other approaches fail. The ombudsman helps resolve discrepancies in loan balances and payments, and helps customers understand interest and collection charges. The office helps resolve issues related to income tax…

  4. Users Office - Removal

    CERN Multimedia

    CERN Bulletin

    2010-01-01

    As of 8 December 2010 and until the end of February 2011, the Users Office will move from Bldg. 60. New Location : Bldg. 510-R-033 Opening Hours: Monday, Tuesday, Thursday, Friday : 08.30 – 12.30 Monday to Friday: 14.00 – 16.00 Closed Wednesday mornings.

  5. Office-based anaesthesia

    African Journals Online (AJOL)

    infection, and consistency in nursing personnel. In the USA 17 -. 24% of all elective ambulatory surgery is ... knowledge base or personality to deal with the OBA environment. Compared with hospitals, office-based facilities currently ... disease or major cardiovascular risk factors). Intravenous access via a flexible cannula is.

  6. Financing medical office buildings.

    Science.gov (United States)

    Blake, J W

    1995-01-01

    This article discusses financing medical office buildings. In particular, financing and ownership options from a not-for-profit health care system perspective are reviewed, including use of tax-exempt debt, taxable debt, limited partnerships, sale, and real estate investment trusts (REITs).

  7. Technical and legal application possibilities of the compulsory labelling of the standby consumption of electrical household and office appliances - Project No. 53/03. Summary of the final report for the Federal Ministry of Economics and Labour

    Energy Technology Data Exchange (ETDEWEB)

    Schlomann, B.; Cremer, C.; Friedewald, M. [Fraunhofer-Institut fuer Systemtechnik und Innovationsforschung, Karlsruhe (DE)] (and others)

    2005-06-13

    The standby consumption of electrical households and office appliances continues to be significant world-wide since the number of products with standby components is constantly increasing. For Germany, a recent assessment of the Fraunhofer ISI (Cremer et al. 2003) for 2001 arrived at an electricity demand of almost 15 TWh for household and office appliances in standby mode. i.e. in standby and off-mode. This represents almost 40% of the total consumption of these appliances and around 3% of the total electricity demand of the final energy sectors in Germany. The standby share in electricity demand is over 80 or even 90% for numerous appliances. The Federal Environmental Agency calculated that every year standby losses in German households and offices are responsible for wasted electricity amounting to 3.5 billion Euro (UBA 2004). For the OECD countries, field studies show that between 3 and 13% of the electricity consumption of households can be ascribed to standby losses (IEA 2001). Without energy policy measures on both national and international levels, there is a great risk that a further increase in standby consumption will occur. Many studies dealing with this subject have already been conducted and have shown that low standby consumption is technically feasible and usually achievable at a reasonable cost. One possible energy policy measure to reduce the standby consumption of electrical household and office appliances is the introduction of mandatory consumption labelling. In principle, a high degree of effectiveness is attributed to such regulatory/command-and-control measures with regard to influencing the energy efficiency of devices. Compulsory energy labels to identify and, where necessary, to classify electricity consumption produce greater market transparency and offer buyers an additional decision criterion. In this way they promote indirectly the development, production and supply of energy-efficient products. When combined with comparatively low

  8. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  9. Igualdad en Rebaja. Reflexiones críticas en torno a la filosofía política de Ronald Dworkin

    Directory of Open Access Journals (Sweden)

    Gustavo Arosemena

    2016-05-01

    Full Text Available El artículo presenta una crítica a la filosofía política igualitaria de Ronald Dworkin a la luz de concepciones alternativas de la igualdad. Primero, a la luz de una igualdad política basada en el pensamiento de Thomas Hobbes. Luego, a la luz de una igualdad “mística” basada en la obra de autores como Elizabeth Anscombe y Bernard Williams. Se sostiene que estas dos concepciones alternativas de la igualdad son más fuertes que la presentada por Dworkin y que juntas dejan poca cabida para la especie de igualdad liberal preferida por este autor. Al final, el artículo presenta reflexiones acerca de la importancia de concederle a la ética un rol más fuerte que el avizorado por Dworkin en la fundamentación te teorías normativas. Dworkin busca crear una relación de reenvío y mutua acomodación entre ética y moral. En realidad, la ética tiene primacía y lo que debe buscarse no es acomodar estas dos ideas, sino derivar completamente la moral de la ética.

  10. Latent tuberculosis infection among sailors and civilians aboard U.S.S. Ronald Reagan--United States, January-July 2006.

    Science.gov (United States)

    2007-01-05

    Crews aboard ships live and work in crowded, enclosed spaces. Historically, large tuberculosis (TB) outbreaks and extensive transmission of Mycobacterium tuberculosis have occurred on U.S. Navy ships. On July 13, 2006, smear- and culture-positive, cavitary, pulmonary TB was diagnosed in a sailor aboard the aircraft carrier U.S.S. Ronald Reagan; the patient, aged 32 years, had a negative human immunodeficiency virus test. The M. tuberculosis strain cultured was susceptible to all first-line TB medications. The sailor was born in the Philippines, had latent tuberculosis infection (LTBI) diagnosed in 1995 shortly after enlisting in the U.S. Navy, and completed the 6-month daily isoniazid course that was standard treatment at that time (current treatment standard is 9 months). This report describes the contact investigation conducted by the U.S. Navy and CDC and demonstrates the importance of timely diagnosis of TB, identification and treatment of new LTBI, and cooperation among local, state, and federal agencies during large contact investigations.

  11. Analysis of shipboard aerosol optical thickness measurements from multiple sunphotometers aboard the R/V Ronald H. Brown during the Aerosol Characterization Experiment - Asia

    International Nuclear Information System (INIS)

    Miller, Mark A.; Knobelspiesse, Kirk; Frouin, Robert; Bartholomew, Mary Jane; Reynolds, R. Michael; Pietras, Christophe; Fargion, Giulietta; Quinn, Patricia; Thieuleux, Francois

    2005-01-01

    Marine sunphotometer measurements collected aboard the R/V Ronald H. Brown during the Aerosol Characterization Experiment - Asia (ACE-Asia) are used to evaluate the ability of complementary instrumentation to obtain the best possible estimates of aerosol optical thickness and Angstrom exponent from ships at sea. A wide range of aerosol conditions, including clean maritime conditions and highly polluted coastal environments, were encountered during the ACE-Asia cruise. The results of this study suggest that shipboard hand-held sunphotometers and fast-rotating shadow-band radiometers (FRSRs) yield similar measurements and uncertainties if proper measurement protocols are used and if the instruments are properly calibrated. The automated FRSR has significantly better temporal resolution (2 min) than the hand-held sunphotometers when standard measurement protocols are used, so it more faithfully represents the variability of the local aerosol structure in polluted regions. Conversely, results suggest that the hand-held sunphotometers may perform better in clean, maritime air masses for unknown reasons. Results also show that the statistical distribution of the Angstrom exponent measurements is different when the distributions from hand-held sunphotometers are compared with those from the FRSR and that the differences may arise from a combination of factors

  12. Prototype of smart office system using based security system

    Science.gov (United States)

    Prasetyo, T. F.; Zaliluddin, D.; Iqbal, M.

    2018-05-01

    Creating a new technology in the modern era gives a positive impact on business and industry. Internet of Things (IoT) as a new communication technology is very useful in realizing smart systems such as: smart home, smart office, smart parking and smart city. This study presents a prototype of the smart office system which was designed as a security system based on IoT. Smart office system development method used waterfall model. IoT-based smart office system used platform (project builder) cayenne so that. The data can be accessed and controlled through internet network from long distance. Smart office system used arduino mega 2560 microcontroller as a controller component. In this study, Smart office system is able to detect threats of dangerous objects made from metals, earthquakes, fires, intruders or theft and perform security monitoring outside the building by using raspberry pi cameras on autonomous robots in real time to the security guard.

  13. 2014 Annual Report, Geothermal Technologies Office

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2015-03-01

    In 2014, the Geothermal Technologies Office (GTO) made significant gains—increased budgets, new projects, key technology successes, and new staff. The Fiscal Year (FY) 2015 budget is at $55 million—roughly a 20% increase over FY 2014, and a strong vote of confidence in what the sector is doing to advance economically competitive renewable energy. GTO also remains committed to a balanced portfolio, which includes new hydrothermal development, EGS, and targeted opportunities in the low-temperature sector.

  14. Office hysteroscopy and adenomyosis.

    Science.gov (United States)

    Molinas, Carlos Roger; Campo, Rudi

    2006-08-01

    Adenomyosis, the heterotopic presence of endometrial glands and stroma within the myometrium, has traditionally been diagnosed by the pathologist in hysterectomy specimens. However, the recent development of high-quality non-invasive techniques such as transvaginal sonography (TVS), magnetic resonance imaging (MRI) and hysteroscopy has renewed interest in diagnosing adenomyosis in the office prior to any treatment. Hysteroscopy offers the advantage of direct visualization of the uterine cavity, and since nowadays it is performed in the office, it can be offered as a first-line diagnostic tool for evaluation of uterine abnormalities in patients with abnormal uterine bleeding and/or infertility. The available data clearly indicate that high-quality mini-hysteroscopes, saline as a distension medium, and atraumatic insertion technique are essential for the success of office hysteroscopy. The procedure is indicated in any situation in which an intrauterine anomaly is suspected; it is immediately preceded by a physical exam and a TVS to evaluate uterine characteristics, and it is followed by a second TVS to take advantage of the intracavitary fluid for a contrast image of the uterus. Although diagnostic hysteroscopy does not provide pathognomonic signs for adenomyosis, some evidence suggests that irregular endometrium with endometrial defects, altered vascularization, and cystic haemorrhagic lesion are possibly associated with the entity. In addition to the direct visualization of the uterine cavity, the hysteroscopic approach offers the possibility of obtaining endometrial/myometrial biopsies under visual control. Since they can be performed in the office, the combination of TVS, fluid hysteroscopy and contrast sonography is therefore a powerful screening tool for detecting endometrial and myometrial abnormalities in association with adenomyosis.

  15. Officer Accessions Flow Model

    Science.gov (United States)

    2011-07-31

    officers select their own BOLC-B dates completely divorced of their unit assignment and that unit’s ARFORGEN cycle. We reschedule all FY10 cohort LTs...for BOLC-B based upon unit priority based upon number of days until LAD. Rescheduling all FY10 cohort LTs for BOLC-B based upon unit priority...with specialty branches (doctors, lawyers, nurses , chaplains, etc) which have minimal representation in BCT-level units.  DCs are not generally

  16. Office software Individual coaching

    CERN Multimedia

    HR Department

    2010-01-01

    If one or several particular topics cause you sleepless nights, you can get the help of our trainer who will come to your workplace for a multiple of 1-hour slots . All fields in which our trainer can help are detailed in the course description in our training catalogue (Microsoft Office software, Adobe applications, i-applications etc.). Please discover these new courses in our catalogue! Tel. 74924

  17. MAIL OFFICE Outgoing mail

    CERN Multimedia

    1999-01-01

    The Mail Office once again wishes to remind users that the Organisation's mail service is exclusively reserved for official mail._\tAll outgoing official mail must arrive at the Mail Office unfranked and with the sender's name and Division clearly marked under the Organsation's address (see example below).Private mail must be taken to the Post Offices at Meyrin (63-R-011) or Prévessin (866-R-C02)._\tPlease only use 'PRIORITY' envelopes for mail requiring priority handling. Internal mail_\tPlease do not forget to indicate your correspondent's 'MAILBOX' number on the internal mail envelopes either in the specific box provided (new envelopes) or next to his or her name (old envelopes). This will facilitate and accelerate the handling of your mail. Mailbox numbers can be found on: Macintosh\tin the 'Mailbox' field in 'VIPER'PC\tin the 'Mailbox' field of 'Phone book'Web: http://www.cern.ch/CERN/Phone.htmlin the 'MailBox' fieldonce you have selected your correspondent's name...

  18. 23 February 2010 - Polish Under Secretary of State, Ministry of Science and Higher Education, J. Szwed visiting CERN installations with sLHC Project Office T. Kurtyka and Machine Protection and Electrical Integrity Group Leader A. Siemko.

    CERN Multimedia

    Michel Blanc

    2010-01-01

    Tirage 1002023-01: In LHCb experimental area with Machine Protection and Electrical Integrity Group Leader A. Siemko; Mission Counselor M. Cichucka; Counselor to the Minister M. Klimkiewicz, Under Secretary of State J. Szwed; LHCb Collaboration, national group leader, Henryk Niewodniczanski Institut of Nuclear Physics G. Polok, Collaboration Spokesperson A. Golutvin and Delegate to CERN Council A. Zalewska. Tirage 28: Visiting the Computing Centre with IT Department Head F. Hemmer Tirage 49: In CMS Control centre, buiding 354 with Collaboration Spokesperson G. Tonelli and CMS Collaboration, national group leader, University of Warsaw J. Krolikowski. Tirage 62: visiting ALICE exhibition area and counting room with Collaboration Spokesperson J. Schukraft. Tirage 82-99: Under Secretary of State address to the Polish Community Tirage 82: Machine Protection and Electrical Integrity Group Leader A. Siemko Tirage 83: Polish Delegate to CERN Council A. Zalewska. Tirage 85: Directorate Office E. Rondio Tirage 86: ATLA...

  19. Office of the Chief Financial Officer Annual Report 2010

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez, Jeffrey

    2010-12-20

    was a pivotal year for the Procurement and Property Department. A provision of the management contract that was signed fives years ago required us to achieve cost savings of $30M. I am proud to announce that this last fiscal year we reached that goal, in large part due to the implementation of eBuy, and the negotiation of strategic sourcing contracts. Our last wall-to-wall inventory exceeded all the Department of Energy's (DOE) national targets and DOE approved the LBNL property system unconditionally. Of the total inventory, 92.3% or 25,601 assets were accounted for using barcode scanning that made the inventory process much more efficient. The effective management of the American Recovery and Reinvestment Act (ARRA) funds was strengthened by the continued successful partnership that LBNL shares with our DOE Site Office. They provided authority, support and clarity to this very complex task. The Laboratory's ARRA Stimulus Committee played a critical role in assuring internal controls, compliance with DOE regulations and quality financial management. The LBNL Budget Officer led a DOE complex-wide effort to identify and share how various DOE facilities track and report ARRA-funded projects, share best practices, evaluate issues and discuss solutions. LBNL has been recognized as a leader in this process and will continue to share knowledge and best practices with other DOE laboratories. Continuous education of our staff as well as the greater Laboratory population was still a major focus of the OCFO. With the help of many OCFO senior managers and staff that acted as subject-matter experts, the Core Financial Management Program was completely re-engineered and resulted in a revised classroom and web-based curriculum that will be formally rolled out Lab-wide in early FY2011. The Office of Sponsored Projects and Industry Partnerships (OSPIP) led the effort to select and purchase four Click Commerce software modules for the LBNL electronic Scientific Research

  20. Project of law, adopted by the Senate, giving permission to the approval of the agreement between the French government and the international organization for thermonuclear fusion energy ITER, relative to the head office of ITER organization and to the privileges and immunities of ITER organization in the French territory

    International Nuclear Information System (INIS)

    2008-01-01

    The will of building up an international thermonuclear experimental reactor (ITER) gathers since several years the European community of atomic energy (Euratom), Japan, the USA, and Russia, next followed by China, South Korea and, since 2005, by India. The agreement signed in Paris between these seven parties on November 21, 2006 entrusted the international organization ITER with the realization of this project. The implications of the ITER project are enormous both in their scientific and in their economical aspects. France has a particular position in this project since the head office of ITER organisation is sited at Saint-Paul-lez-Durance and the tokamak will be built at Cadarache. Therefore, an agreement has been signed between ITER organization and the French government. The approval of this agreement is the object of this project of law made of a single article. The agreement between the French government and the international organization ITER is attached to the document. It defines the juridical status, the privileges and immunities of the organization itself and of its personnel inside the French territory. An appendix to the agreement precises the cooperation modalities between the French authorities and ITER organization. (J.S.)

  1. Effects of office innovation on office workers' health and performance

    NARCIS (Netherlands)

    Meijer, Eline M.; Frings-Dresen, Monique H. W.; Sluiter, Judith K.

    2009-01-01

    The implementation of an innovative office concept (e.g. open-plan, flexible workplaces and a paperless office concept) on health and productivity among office workers was evaluated with questionnaires of 138 workers at baseline and 6 and 15 months afterwards. Work-related fatigue, general health,

  2. 77 FR 3787 - Notice of Submission of Proposed Information Collection to OMB; Office of Hospital Facilities...

    Science.gov (United States)

    2012-01-25

    ... administration and initial/final endorsement of projects undertaken by Office of Hospital Facilities. DATES... Proposed Information Collection to OMB; Office of Hospital Facilities Transactional Forms for FHA Programs... Lists the Following Information Title of Proposal: Office of Hospital Facilities Transactional Forms for...

  3. Managing Projects with KPRO

    Science.gov (United States)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  4. Virtuelt skrivebord med open office

    DEFF Research Database (Denmark)

    Nielsen, Kurt Gammelgaard

    2009-01-01

    SDUs erfaringer med projektet Port 22: en virtuel platform med Open Office som kontorpakke til studerende.......SDUs erfaringer med projektet Port 22: en virtuel platform med Open Office som kontorpakke til studerende....

  5. Office of Disability Employment Policy

    Science.gov (United States)

    ... STATES DEPARTMENT OF LABOR Facebook Twitter RSS Email Office of Disability Employment Policy (ODEP) Menu About ODEP ... LABOR DEPARTMENT Español A to Z Index Agencies Office of Inspector General Leadership Team Contact Us Subscribe ...

  6. The Office of Airline Information.

    Science.gov (United States)

    2015-01-01

    The Office of Airline Information (OAI) mandate is to collect, validate, compile and disseminate data on airline traffic, performance, finances, and fares. Each quarter, BTS Office of Airline Information (OAI) processes more than 3,800 filings sub...

  7. Ergonomics in the office environment

    Science.gov (United States)

    Courtney, Theodore K.

    1993-01-01

    Perhaps the four most popular 'ergonomic' office culprits are: (1) the computer or visual display terminal (VDT); (2) the office chair; (3) the workstation; and (4) other automated equipment such as the facsimile machine, photocopier, etc. Among the ergonomics issues in the office environment are visual fatigue, musculoskeletal disorders, and radiation/electromagnetic (VLF,ELF) field exposure from VDT's. We address each of these in turn and then review some regulatory considerations regarding such stressors in the office and general industrial environment.

  8. Is the Office Hour Obsolete?

    Science.gov (United States)

    Behrens, Susan

    2013-01-01

    A colleague can't make a coffee date at a time the author proposes because it would conflict with his office hour. No student has actually made an appointment with him during the hour, but he is committed to being in his office as promised in case someone drops by. The author's reaction to her colleague's faithfulness to his posted office hour…

  9. Fermilab Education Office: Science Adventures

    Science.gov (United States)

    Search The Education Office: Science Adventures Adventure Catalog Search for Adventures Calendar Class Facebook Group. Contact: Science Adventures Registrar, Education Office Fermilab, MS 777, P.O. Box 500 it again." Opportunities for Instructors The Education Office has openings for instructors who

  10. Office software Individual coaching

    CERN Multimedia

    HR Department

    2010-01-01

    If one or several particular topics cause you sleepless nights, you can get help from our trainer who will come to your workplace for a multiple of 1-hour slots . All fields in which our trainer can help are detailed in the course description in our training catalogue (Microsoft Office software, Adobe applications, i-applications etc.) Discover these new courses in our catalogue! http://cta.cern.ch/cta2/f?p=110:9 Technical Training Service Technical.Training@cern.ch Tel 74924

  11. Office lighting systems: Optimization

    Energy Technology Data Exchange (ETDEWEB)

    Dagnino, U. (ENEL, Milan (Italy))

    1990-09-01

    Relative to office lighting systems, in particular, those making use of tubular fluorescent lamps, currently available on the international market, this paper tries to develop lighting system, design optimization criteria. The comparative assessment of the various design possibilities considers operating cost, energy consumption, and occupational comfort/safety aspects such as lighting level uniformity and equilibrium, reduction of glare and reflection, natural/artificial lighting balance, programmed switching, computerized control systems for multi-use requirements in large areas, programmed maintenance for greater efficiency and reliability.

  12. 78 FR 2685 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental...

    Science.gov (United States)

    2013-01-14

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental Assessment AGENCY: Office of the Assistant Secretary... assessment for the East Hobble Creek Restoration Project is available for public review and comment. The...

  13. Assessment of current burden of human rabies at Sir Ronald Ross Institute of Tropical and Communicable Diseases (Government Fever Hospital – Five year study

    Directory of Open Access Journals (Sweden)

    Dukkipati Kalyani

    2017-01-01

    Full Text Available Human rabies has been still endemic in India. There are an increasing number of studies estimating the burden of human rabies, but the true incidence of the disease and endemicity were rarely reported in the literature. The main objectives of the present study were to determine the endemicity and to estimate the current burden of human rabies in and around Sir Ronald Ross Institute of Tropical and Communicable Diseases (SRRIT & CD, Nallakunta, Hyderabad. All cases admitted at SRRIT & CD with signs and symptoms of rabies were studied during the period of January 2009 and December 2013. The annual incidence of human rabies in this hospital was estimated to be 152. It is endemic mainly in urban areas that include many areas in Hyderabad and Secunderabad and also adjacent districts. The majority of the patients were children and adult male, from urban areas, and had not taken post exposure prophylaxis (PEP i.e. wound care, active immunization (ARV and passive immunization (RIG. The main animals responsible for bites were dogs (99%, most of which were stray and the most common bite sites were the extremities. Most common clinical feature was hydrophobia. About 92.76% of these patients had not taken PEP. Human rabies continues to be a dreadful disease in India and the dogs are the principal reservoir, mainly stray dogs. This study provides strong evidence that human rabies is still an endemic disease even in urban areas. This is mainly due to lack of awareness about proper PEP. Improved coverage with modern rabies vaccines, control of rabies due to dogs and other animals and intensifying public education about the disease play main role in the reduction of the disease. [J Med Allied Sci 2017; 7(1.000: 14-19

  14. Mastering VBA for Office 2010

    CERN Document Server

    Mansfield, Richard

    2010-01-01

    A comprehensive guide to the language used to customize Microsoft Office. Visual Basic for Applications (VBA) is the language used for writing macros, automating Office applications, and creating custom applications in Word, Excel, PowerPoint, Outlook, and Access. This complete guide shows both IT professionals and novice developers how to master VBA in order to customize the entire Office suite for specific business needs.: Office 2010 is the leading productivity suite, and the VBA language enables customizations of all the Office programs; this complete guide gives both novice and experience

  15. Teach yourself visually Office 2013

    CERN Document Server

    Marmel, Elaine

    2013-01-01

    Learn the new Microsoft Office suite the easy, visual way Microsoft Office 2013 is a power-packed suite of office productivity tools including Word, Excel, PowerPoint, Outlook, Access, and Publisher. This easy-to-use visual guide covers the basics of all six programs, with step-by-step instructions and full-color screen shots showing what you should see at each step. You'll also learn about using Office Internet and graphics tools, while the additional examples and advice scattered through the book give you tips on maximizing the Office suite. If you learn best when you can see how

  16. Self-reported health and comofrt in modern office buildings: first results from the European Officair study

    NARCIS (Netherlands)

    Bluyssen, P.M.; Roda, C.; Mandin, C.; Fossati, S.; Carrer, P.; Kluizenaar, Y. de; Mihucz, V.G.; Oliveira Fernandes, E. de; Bartzis, J.

    2015-01-01

    In the European research project OFFICAIR, a procedure was developed to determine associations between characteristics of European offices and health and comfort of office workers, through a checklist and a selfadministered questionnaire including environmental, physiological, psychological, and

  17. 76 FR 5391 - Office of Biotechnology Activities, Office of Science Policy, Office of the Director

    Science.gov (United States)

    2011-01-31

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Office of Biotechnology Activities, Office of Science Policy, Office of the Director Amended Notice of Meeting Notice is hereby given of a change in the meeting of the National Science Advisory Board for Biosecurity (NSABB), February...

  18. Advanced Energy Projects FY 1990 research summaries

    International Nuclear Information System (INIS)

    1990-09-01

    This report serves as a guide to prepare proposals and provides summaries of the research projects active in FY 1990, sponsored by the Office of Basic Energy Sciences Division of Advanced Energy Projects, Department of Energy. (JF)

  19. Rehabilitation in Principle and Practice: Perspectives of Inmates and Officers

    OpenAIRE

    Yanique A. Anderson; Linda Gröning

    2017-01-01

    This article addresses rehabilitation, its conceptualisation by officers and inmates, and its expression in practice within a select Norwegian prison. It reports on findings from a qualitative interview-based research project conducted as a pilot study, whereby semi-structured interviews were conducted with inmates and officers at the prison. Furthermore, the authors examine the principle of rehabilitation as it follows from Norwegian law and assess how it is implemented in practice in a Norw...

  20. Bad Enough Ergonomics: A Case Study of an Office Chair

    OpenAIRE

    Peteri, Virve

    2017-01-01

    The article analyzes ergonomics as a social and cultural phenomenon, as something that is formulated and described by speakers in a specific social context; in a company that is specialized in producing ergonomic office furniture. Through a case study of an office chair, the article examines how ergonomics and its association with the vision of the potential users and their working spaces are constructed by the relevant actors in project meetings and individual interviews during the manufactu...

  1. Office of the Chief Financial Officer Annual Report 2007

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez, Jeffrey

    2007-12-18

    2007 was a year of progress and challenges for the Office of the Chief Financial Officer (OCFO). I believe that with the addition of a new Controller, the OCFO senior management team is stronger than ever. With the new Controller on board, the senior management team spent two intensive days updating our strategic plan for the next five years ending in 2012, while making sure that we continue to execute on our existing strategic initiatives. In 2007 the Budget Office, teaming with Human Resources, worked diligently with our colleagues on campus to reengineer the Multi-Location Appointment (MLA) process, making it easier for our Principal Investigators (PIs) to work simultaneously between the Laboratory and UC campuses. The hiring of a point-of-contact in Human Resources to administer the program will also make the process flow smoother. In order to increase our financial flexibility, the OCFO worked with the Department of Energy (DOE) to win approval to reduce the burden rates on research and development (R&D) subcontracts and Intra-University Transfers (IUT). The Budget Office also performed a 'return on investment' (ROI) analysis to secure UCRP funding for a much needed vocational rehabilitation counselor. This new counselor now works with employees who are on medical leave to ensure that they can return to work in a more timely fashion, or if not able to return, usher them through the various options available to them. Under the direction of the new Controller, PriceWaterhouse Coopers (PWC) performed their annual audit of the Laboratory's financial data and reported positive results. In partnership with the Financial Policy and Training Office, the Controller's Office also helped to launch self-assessments of some of our financial processes, including timekeeping and resource adjustments. These self assessments were conducted to promote efficiencies and mitigate risk. In some cases they provided assurance that our practices are sound, and in

  2. Configuration Control Office

    CERN Multimedia

    Beltramello, O

    In order to enable Technical Coordination to manage the detector configuration and to be aware of all changes in this configuration, a baseline of the envelopes has been created in April 2001. Fifteen system and multi-system envelope drawings have been approved and baselined. An EDMS file is associated with each approved envelope, which provides a list of the current known unsolved conflicts related to the envelope and a list of remaining drawing inconsistencies to be corrected. The envelope status with the associated drawings and EDMS file can be found on the web at this adress: http://atlasinfo.cern.ch/Atlas/TCOORD/Activities/Installation/Configuration/ Any modification in the baseline has to be requested via the Engineering Change Requests. The procedure can be found under: http://atlasinfo.cern.ch/Atlas/TCOORD/Activities/TcOffice/Quality/ECR/ TC will review all the systems envelopes in the near future and manage conflict resolution with the collaboration of the systems.

  3. Physician offices marketing: assessing patients' views of office visits.

    Science.gov (United States)

    Emmett, Dennis; Chandra, Ashish

    2010-01-01

    Physician offices often lack the sense of incorporating appropriate strategies to make their facilities as marketer of their services. The patient experience at a physician's office not only incorporates the care they receive from the physician but also the other non-healthcare related aspects, such as the behavior of non-health professionals as well as the appearance of the facility itself. This paper is based on a primary research conducted to assess what patients assess from a physician office visit.

  4. The office based CHIVA

    Directory of Open Access Journals (Sweden)

    Passariello F

    2013-09-01

    Full Text Available Fausto Passariello,1 Stefano Ermini,2 Massimo Cappelli,3 Roberto Delfrate,4 Claude Franceschi5 1Centro Diagnostico Aquarius, Napoli, Italy; 2Private Practice, Grassina, Italy; 3Private Practice, Firenze, Italy; 4Casa di Cure Figlie di Maria, Cremona, Italy; 5Hospital St Joseph, Service d'Explorations Vasculaires, Paris, France Abstract: The cure Conservatrice Hémodynamique de l'Insuffisance Veineuse en Ambulatoire (CHIVA can be office based (OB. The OB-CHIVA protocol is aimed at transferring CHIVA procedures to specialists rooms. The protocol will check the feasibility of OB-CHIVA, data pertaining to recurrence, and will offer the opportunity to study saphenous femoral junction (SFJ stump evolution, the role of the washing vessels and the arch recanalization rate, and gather new data about the effect of the length of the treated saphenous vein. A simplified diagnostic procedure will allow an essential ultrasound examination of the venous net while a schematic and easily readable algorithm guides therapeutic choices. The Riobamba draining crossotomy (RDC tactic is composed of a set of OB procedures. While some of these procedures are, at the moment, only proposals, others are already applied. Devices generally used in ablative procedures such as Light Amplification by Stimulated Emission of Radiation (LASER, radio frequency, steam, and mechanical devices are used in this context to serve to conservative interventions for CHIVA. New techniques have also been proposed for devalvulation and tributary disconnection. Detailed follow-up is necessary in order to determine the effects of therapy and possible disease evolution. Finally, information is added about the informed consent and the ethical considerations of OB-CHIVA research. Keywords: CHIVA, office based procedures, LASER, RF, steam

  5. Office and Agamben's Genealogy of Economy and Government

    DEFF Research Database (Denmark)

    Dean, Mitchell

    2017-01-01

    This paper locates Giorgio Agamben’s book Opus Dei in his larger Homo Sacer project and particularly a series of genealogical and archaeological studies within it. It argues for a disenchanted and dispersed reading of Agamben’s approach to office as a resource for concerns that are germane...... for office. More broadly, Agamben’s work on office is shown to bear upon questions of the constitution of sovereignty and government as forms of power, on different forms of rationalisation, and themes of secularisation and modernity found in classical sociology and intellectual history....

  6. Energy optimization of office buildings; Energioptimering af kontorbyggeri

    Energy Technology Data Exchange (ETDEWEB)

    Wittchen, K.B.; Place Hansen, E.J. de (Statens Byggeforskningsinstitut (SBi), Hoersholm (Denmark)); Radisch, N.H.; Treldal, J. (Ramboell A/S, Koebenhavn (Denmark))

    2011-07-01

    The project analysed two main office building types - high-rises and low-rises - and calculated a number of parameters, using the simulation program BSim. Calculations showed that the overall building design and orientation effect is moderate compared with, for instance, use of daylight control and low-energy lighting, computers, etc. Considerable energy savings can be achieved by use of natural ventilation in the summer, thus only using mechanical ventilation with heat recovery during the day in the winter. Open-plan offices result in a better indoor climate and lower energy consumption than cubicle offices. (LN)

  7. DOE Office of Environmental Management, 2016 Year in Review

    Energy Technology Data Exchange (ETDEWEB)

    None

    2016-12-01

    2016 accomplishments and primary areas of focus for the Department of Energy's (DOE's) Office of Environmental Management and EM sites are presented. For DOE EM, these include Focusing on the Field, Teaming with Cleanup Partners, Developing New Technology, and Maximizing Cleanup Dollars. Major 2016 achievements are highlighted for EM, Richland Operations Office, Office of River Protection, Savannah River Site, Oak Ridge, Idaho, Waste Isolation Pilot Plant, Los Alamos, Portsmouth, Paducah, West Valley Demonstration Project, and the Nevada National Security Site,

  8. Perceived Speech Privacy in Computer Simulated Open-plan Offices

    DEFF Research Database (Denmark)

    Pop, Claudiu B.; Rindel, Jens Holger

    2005-01-01

    In open plan offices the lack of speech privacy between the workstations is one of the major acoustic problems. Improving the speech privacy in an open plan design is therefore the main concern for a successful open plan environment. The project described in this paper aimed to find an objective...... parameter that correlates well with the perceived degree of speech privacy and to derive a clear method for evaluating the acoustic conditions in open plan offices. Acoustic measurements were carried out in an open plan office, followed by data analysis at the Acoustic Department, DTU. A computer model...

  9. United States Army Officer Professional Development: Black Officers' Perspectives

    National Research Council Canada - National Science Library

    Johnson, Craig

    1997-01-01

    .... Even so, they have not fared statistically as well as their majority contemporaries. These statistics pose interesting questions about black officer professional development and career progress...

  10. Office of Safeguards and Security - Operational Interface

    International Nuclear Information System (INIS)

    Hammond, G.A.

    1987-01-01

    The mission of the Office of Safeguards and Security (OSS), Department of Energy (DOE) is to: Develop policy and programs to protect DOE facilities, nuclear materials, and classified information; Provide oversight for safeguards and security operations; Direct research and development (RandD) to support the protection program; and Strengthen international safeguards in support of nonproliferation policy. Objectives are to maintain an integrated safeguards and security system that is effective against a wide range of threats, and do so in a manner to minimize impacts on facility operation. Implementation is the responsibility of field offices and contractors operating DOE facilities. The OSS-operational interface is the focus of this discussion with emphasis on RandD to meet user needs. The scope and project selection process will be discussed along with information required for evaluation, and field operational planning and budgeting commitments to permit implementation of successful RandD results

  11. Office of Industrial Technologies research in progress

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-01

    The US Department of Energy (DOE) Office of Industrial Technologies (OIT) conducts research and development activities which focus on improving energy efficiency and providing for fuel flexibility within US industry in the area of industrial conservation. The mission of OIT is to increase the utilization of existing energy-efficient equipment and to find and promote new, cost-effective ways for industrial facilities to improve their energy efficiency and minimize waste products. To ensure advancement of the technological leadership of the United States and to improve the competitiveness of American industrial products in world markets, OIT works closely with industrial partners, the staffs of the national laboratories, and universities to identify research and development needs and to solve technological challenges. This report contains summaries of the currently active projects supported by the Office of Industrial Technologies.

  12. 49 CFR 800.25 - Delegation to the Directors of Office of Aviation Safety, Office of Railroad Safety, Office of...

    Science.gov (United States)

    2010-10-01

    ... Office of Aviation Safety, Office of Railroad Safety, Office of Highway Safety, Office of Marine Safety... Offices of Aviation, Railroad, Highway, Marine, and Pipeline and Hazardous Materials Safety, the authority... 49 Transportation 7 2010-10-01 2010-10-01 false Delegation to the Directors of Office of Aviation...

  13. Partial pressure (or fugacity) of carbon dioxide, dissolved inorganic carbon, pH, alkalinity, temperature, salinity and other variables collected from discrete sample and profile observations using CTD, bottle and other instruments from NOAA Ship RONALD H. BROWN in the Gray's Reef National Marine Sanctuary, Gulf of Mexico and North Atlantic Ocean from 2012-07-21 to 2012-08-13 (NCEI Accession 0157619)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0157619 includes biological, chemical, discrete sample, optical, physical and profile data collected from NOAA Ship RONALD H. BROWN in the Gray's Reef...

  14. Partial pressure (or fugacity) of carbon dioxide, salinity and other variables collected from Surface underway observations using Carbon dioxide (CO2) gas analyzer, Shower head chamber equilibrator for autonomous carbon dioxide (CO2) measurement and other instruments from NOAA Ship RONALD H. BROWN in the Hawaiian Islands Humpback Whale National Marine Sanctuary, North Pacific Ocean and South Pacific Ocean from 2014-02-25 to 2014-11-24 (NODC Accession 0117674)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0117674 includes Surface underway, chemical, meteorological and physical data collected from NOAA Ship RONALD H. BROWN in the Hawaiian Islands...

  15. Partial pressure (or fugacity) of carbon dioxide, salinity and other variables collected from underway - surface observations using Carbon dioxide (CO2) gas analyzer, Shower head chamber equilibrator for autonomous carbon dioxide (CO2) measurement and other instruments from NOAA Ship RONALD H. BROWN in the Gulf of Guinea, Gulf of Mexico, North Atlantic Ocean and South Atlantic Ocean from 2010-03-08 to 2010-12-20 (NODC Accession 0108093)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NODC Accession 0108093 includes chemical, meteorological, physical and underway - surface data collected from NOAA Ship RONALD H. BROWN in the Gulf of Guinea, Gulf...

  16. Partial pressure (or fugacity) of carbon dioxide, dissolved inorganic carbon, alkalinity, temperature, salinity and other variables collected from Surface underway, discrete sample and profile observations using Alkalinity titrator, Barometric pressure sensor and other instruments from NOAA Ship RONALD H. BROWN in the Coastal Waters of Florida, Gray's Reef National Marine Sanctuary and others from 2007-05-11 to 2007-08-04 (NODC Accession 0083633)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0083633 includes Surface underway, chemical, discrete sample, meteorological, optical, physical and profile data collected from NOAA Ship RONALD H....

  17. Partial pressure (or fugacity) of carbon dioxide, salinity and other variables collected from Surface underway observations using Carbon dioxide (CO2) gas analyzer, Shower head chamber equilibrator for autonomous carbon dioxide (CO2) measurement and other instruments from NOAA Ship RONALD H. BROWN in the Coastal Waters of Southeast Alaska and British Columbia, Cordell Bank National Marine Sanctuary and others from 2016-01-05 to 2016-07-07 (NCEI Accession 0157306)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0157306 includes Surface underway, chemical, meteorological and physical data collected from NOAA Ship RONALD H. BROWN in the Coastal Waters of...

  18. Partial pressure (or fugacity) of carbon dioxide, salinity and other variables collected from Surface underway observations using Carbon dioxide (CO2) gas analyzer, Shower head chamber equilibrator for autonomous carbon dioxide (CO2) measurement and other instruments from NOAA Ship RONALD H. BROWN in the Caribbean Sea, Channel Islands National Marine Sanctuary and others from 1997-07-28 to 1997-11-14 (NODC Accession 0081011)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0081011 includes Surface underway, chemical, meteorological and physical data collected from NOAA Ship RONALD H. BROWN in the Caribbean Sea, Channel...

  19. Partial pressure (or fugacity) of carbon dioxide, dissolved inorganic carbon, pH, alkalinity, temperature, salinity and other variables collected from discrete sample and profile observations using Alkalinity titrator, Barometric pressure sensor and other instruments from NOAA Ship RONALD H. BROWN in the South Atlantic Ocean, South Pacific Ocean and Southern Oceans from 2005-01-11 to 2005-02-24 (NODC Accession 0108153)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0108153 includes discrete sample and profile data collected from NOAA Ship RONALD H. BROWN in the South Atlantic Ocean, South Pacific Ocean and...

  20. Dissolved inorganic carbon, total alkalinity, pH, fugacity of carbon dioxide, and other variables from surface observations using Niskin bottle, flow through pump and other instruments from NOAA Ship Ronald H. Brown in the Gulf of Mexico and East Coast of the United States during the second Gulf of Mexico and East Coast Carbon (GOMECC-2) Cruise from 2012-07-22 to 2012-08-13 (NODC Accession 0117971)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This archival package contains ocean acidification related data from the second Gulf of Mexico and East Coast Carbon (GOMECC-2) Cruise on board NOAA Ship Ronald H....

  1. Partial pressure (or fugacity) of carbon dioxide, salinity and other variables collected from Surface underway observations using Carbon dioxide (CO2) gas analyzer, Shower head chamber equilibrator for autonomous carbon dioxide (CO2) measurement and other instruments from NOAA Ship RONALD H. BROWN in the Coastal Waters of Florida, Florida Keys National Marine Sanctuary and others from 2012-02-15 to 2012-08-27 (NODC Accession 0109926)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0109926 includes Surface underway, chemical, meteorological and physical data collected from NOAA Ship RONALD H. BROWN in the Coastal Waters of...

  2. Partial pressure (or fugacity) of carbon dioxide, salinity and other variables collected from underway - surface observations using Carbon dioxide (CO2) gas analyzer, Shower head chamber equilibrator for autonomous carbon dioxide (CO2) measurement and other instruments from NOAA Ship RONALD H. BROWN in the Caribbean Sea, Gulf of Mexico and others from 2009-04-17 to 2009-10-18 (NODC Accession 0109931)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NODC Accession 0109931 includes biological, chemical, meteorological, physical and underway - surface data collected from NOAA Ship RONALD H. BROWN in the Caribbean...

  3. Partial pressure (or fugacity) of carbon dioxide, salinity and other variables collected from Surface underway observations using Carbon dioxide (CO2) gas analyzer, Shower head chamber equilibrator for autonomous carbon dioxide (CO2) measurement and other instruments from NOAA Ship RONALD H. BROWN in the Caribbean Sea, Coastal Waters of Florida and others from 1998-01-08 to 1998-11-22 (NODC Accession 0081012)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0081012 includes Surface underway, chemical and physical data collected from NOAA Ship RONALD H. BROWN in the Caribbean Sea, Coastal Waters of...

  4. Partial pressure (or fugacity) of carbon dioxide, salinity and other variables collected from Surface underway observations using Carbon dioxide (CO2) gas analyzer, Shower head chamber equilibrator for autonomous carbon dioxide (CO2) measurement and other instruments from NOAA Ship RONALD H. BROWN in the Bering Sea, Channel Islands National Marine Sanctuary and others from 2001-02-07 to 2001-12-03 (NODC Accession 0081015)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0081015 includes Surface underway, chemical and physical data collected from NOAA Ship RONALD H. BROWN in the Bering Sea, Channel Islands National...

  5. Partial pressure (or fugacity) of carbon dioxide, salinity and other variables collected from underway - surface observations using Carbon dioxide (CO2) gas analyzer, Shower head chamber equilibrator for autonomous carbon dioxide (CO2) measurement and other instruments from NOAA Ship RONALD H. BROWN in the North Atlantic Ocean and South Atlantic Ocean from 2011-07-22 to 2011-12-06 (NODC Accession 0108094)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NODC Accession 0108094 includes chemical, meteorological, physical and underway - surface data collected from NOAA Ship RONALD H. BROWN in the North Atlantic Ocean...

  6. Partial pressure (or fugacity) of carbon dioxide, salinity and other variables collected from Surface underway observations using Carbon dioxide (CO2) gas analyzer, Shower head chamber equilibrator for autonomous carbon dioxide (CO2) measurement and other instruments from NOAA Ship RONALD H. BROWN in the North Atlantic Ocean and South Atlantic Ocean from 2010-03-08 to 2010-04-17 (NCEI Accession 0157269)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — NCEI Accession 0157269 includes Surface underway, chemical, meteorological and physical data collected from NOAA Ship RONALD H. BROWN in the North Atlantic Ocean and...

  7. Becoming an Officer of Consequence

    Science.gov (United States)

    2007-01-01

    ndupress .ndu.edu   issue 44, 1st quarter 2007  /  JFQ        6 Becoming an officer of Consequence m uch of the literature about military history...commander become officers of consequence because their commanders value their judgment and seek their counsel when making difficult choices...COVERED 00-00-2007 to 00-00-2007 4. TITLE AND SUBTITLE Becoming an Officer of Consequence 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM

  8. Battlefield Electromagnetic Environments Office (BEEO)

    Data.gov (United States)

    Federal Laboratory Consortium — The Battlefield Electromagnetic Environments Office (BEEO) develops, maintains, and operates the Army Materiel Command (AMC) databases for spectrum management, per...

  9. My Work in the NASA Glenn History Office and Records Management Office

    Science.gov (United States)

    Mate, Robert C.

    2004-01-01

    This is my fourth summer working with my mentor, Kevin P. Coleman, who is the Center History Coordinator, Center Records Manager, and Center Forms Manager. I am working in the GRC History Office with some overlap in the Records Management Office. I have three major projects this summer. First, I am assisting in the documentation of historic facilities. Second, I am involved in a project to organize files and create an archives at Plum Brook Station. Third, I have helped the records management office with its inventory of stored records at Plum Brook. Also, I received an award this summer for research work I had done for NASA in the past. First, my primary project is to help assemble documentation for historic facilities at Glenn. This is somewhat of an extension of my project from last summer. Last summer, I worked to compile a complete list of all of NASA s historic sites and landmarks (as designated by the National Park Service, as well as several private organizations) throughout the country. Then, I briefly researched the significance of historic designation under federal law. Finally, I put my findings into a report which was submitted to NASA Headquarters. Upon review by the NASA History Office and several center-level history officials, it was decided that NASA should work to update its documentation of its historic sites and landmarks since some of the documentation was outdated or unavailable. Until recently, many project managers and facility managers working at historic facilities were not even aware that their surroundings had been designated as historic under federal law (most specifically, the National Historic Preservation Act of 1966 and its amendments). Therefore, they were unaware of the legal obligations for historic preservation. This summer, my project is to research some of Glenn s historic sites and landmarks in more detail. The goal is to put together a template for documenting historic NASA facilities. The hope is that this template of

  10. Aerosol Optical Properties Measured Onboard the Ronald H. Brown During ACE Asia as a Function of Aerosol Chemical Composition and Source Region

    Science.gov (United States)

    Quinn, P. K.; Coffman, D. J.; Bates, T. S.; Welton, E. J.; Covert, D. S.; Miller, T. L.; Johnson, J. E.; Maria, S.; Russell, L.; Arimoto, R.

    2004-01-01

    During the ACE Asia intensive field campaign conducted in the spring of 2001 aerosol properties were measured onboard the R/V Ronald H. Brown to study the effects of the Asian aerosol on atmospheric chemistry and climate in downwind regions. Aerosol properties measured in the marine boundary layer included chemical composition; number size distribution; and light scattering, hemispheric backscattering, and absorption coefficients. In addition, optical depth and vertical profiles of aerosol 180 deg backscatter were measured. Aerosol within the ACE Asia study region was found to be a complex mixture resulting from marine, pollution, volcanic, and dust sources. Presented here as a function of air mass source region are the mass fractions of the dominant aerosol chemical components, the fraction of the scattering measured at the surface due to each component, mass scattering efficiencies of the individual components, aerosol scattering and absorption coefficients, single scattering albedo, Angstrom exponents, optical depth, and vertical profiles of aerosol extinction. All results except aerosol optical depth and the vertical profiles of aerosol extinction are reported at a relative humidity of 55 +/- 5%. An over-determined data set was collected so that measured and calculated aerosol properties could be compared, internal consistency in the data set could be assessed, and sources of uncertainty could be identified. By taking into account non-sphericity of the dust aerosol, calculated and measured aerosol mass and scattering coefficients agreed within overall experimental uncertainties. Differences between measured and calculated aerosol absorption coefficients were not within reasonable uncertainty limits, however, and may indicate the inability of Mie theory and the assumption of internally mixed homogeneous spheres to predict absorption by the ACE Asia aerosol. Mass scattering efficiencies of non-sea salt sulfate aerosol, sea salt, submicron particulate organic

  11. 2013 Building Technologies Office Program Peer Review Report

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2013-11-01

    The 2013 Building Technologies Office Program Peer Review Report summarizes the results of the 2013 Building Technologies Office (BTO) peer review, which was held in Washington, D.C., on April 2–4, 2013. The review was attended by over 300 participants and included presentations on 59 BTO-funded projects: 29 from BTO’s Emerging Technologies Program, 20 from the Commercial Buildings Integration Program, 6 from the Residential Buildings Integration Program, and 4 from the Building Energy Codes Program. This report summarizes the scores and comments provided by the independent reviewers for each project.

  12. Stakeholder Relations Office

    CERN Multimedia

    2013-01-01

    Scientists, politicians, the public, school children, our neighbours, you. All of these groups of people have a stake in CERN, and all are important to us.   The list of stakeholders in an organisation as large and complex as CERN is a long and ever lengthening one. Each group has its own specific interests and needs in terms of what kind of information it requires from CERN and how we should engage. It’s important, therefore, for us to ensure that we’re communicating optimally with everyone we care about and who cares about us. This is something that CERN has always taken seriously. The CERN Courier, for example, was first published in 1959 and we had a pro-active public information office right from the start. Today, our stakeholder relations are spread between several groups and teams, reflecting the nature of CERN today. But while we’re already doing a good job, I think we can do better by exploiting the synergies between these teams, and that’s wh...

  13. Integrated Budget Office Toolbox

    Science.gov (United States)

    Rushing, Douglas A.; Blakeley, Chris; Chapman, Gerry; Robertson, Bill; Horton, Allison; Besser, Thomas; McCarthy, Debbie

    2010-01-01

    The Integrated Budget Office Toolbox (IBOT) combines budgeting, resource allocation, organizational funding, and reporting features in an automated, integrated tool that provides data from a single source for Johnson Space Center (JSC) personnel. Using a common interface, concurrent users can utilize the data without compromising its integrity. IBOT tracks planning changes and updates throughout the year using both phasing and POP-related (program-operating-plan-related) budget information for the current year, and up to six years out. Separating lump-sum funds received from HQ (Headquarters) into separate labor, travel, procurement, Center G&A (general & administrative), and servicepool categories, IBOT creates a script that significantly reduces manual input time. IBOT also manages the movement of travel and procurement funds down to the organizational level and, using its integrated funds management feature, helps better track funding at lower levels. Third-party software is used to create integrated reports in IBOT that can be generated for plans, actuals, funds received, and other combinations of data that are currently maintained in the centralized format. Based on Microsoft SQL, IBOT incorporates generic budget processes, is transportable, and is economical to deploy and support.

  14. Ideas for Office Occupations Education.

    Science.gov (United States)

    Alverson, Ruby; And Others

    Prepared by South Carolina office occupations teachers, this booklet contains ideas for effective and motivating teaching methods in office occupations courses on the secondary school level. Besides ideas generally applicable, suggestions are included for teaching the following specific subjects: (1) accounting, (2) recordkeeping, (3) cooperative…

  15. The PR Officer's Survival Kit.

    Science.gov (United States)

    Woodrum, Robert L.

    1996-01-01

    A former corporate public relations (PR) professional shares strategies for communicating and cooperating with the chief executive officer, and particularly for coping with differences in perceptions of the public relations officer's role. Basic attributes of a successful PR professional are outlined: good communication skills, an analytical…

  16. The New Planned Giving Officer.

    Science.gov (United States)

    Jordan, Ronald R.; Quynn, Katelyn L.

    1994-01-01

    A planned giving officer is seen as an asset to college/university development for technical expertise, credibility, and connections. Attorneys, certified public accountants, bank trust officers, financial planners, investment advisers, life insurance agents, and real estate brokers may be qualified but probably also need training. (MSE)

  17. 75 FR 63753 - Family Offices

    Science.gov (United States)

    2010-10-18

    ... interpreted the term, because, among the variety of services provided, family offices are in the business of...: Private Wealth Management in the Family Context, Wharton Global Family Alliance (Apr. 1, 2008), available..., management, and employment structures and arrangements employed by family offices.'' \\14\\ We have taken this...

  18. Richland Operations Office technology summary

    International Nuclear Information System (INIS)

    1994-05-01

    This document has been prepared by the Department of Energy's Environmental Management Office of Technology Development to highlight its research, development, demonstration, testing, and evaluation activities funded through the Richland Operations Office. Technologies and processes described have the potential to enhance cleanup and waste management efforts

  19. Richland Operations Office technology summary

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    This document has been prepared by the Department of Energy`s Environmental Management Office of Technology Development to highlight its research, development, demonstration, testing, and evaluation activities funded through the Richland Operations Office. Technologies and processes described have the potential to enhance cleanup and waste management efforts.

  20. What set's the officer apart?

    NARCIS (Netherlands)

    Jansen, M.M.; Moelker, R.

    2016-01-01

    The Officer Corps constitutes the backbone of the military. Privates and NCOs come and go. Political leaders are replaced. But the officer corps, the military profession per se, endures. The focus of this paper is how the military profession is maintained by military academies. A profession is

  1. Athena Community Office

    Science.gov (United States)

    Martínez-Núnez, S.; Barcons, X.; Barret, D.; Bozzo, E.; Carrera, F. J.; Ceballos, M. T.; Gómez, S.; Monterde, M. P.; Rau, A.

    2017-03-01

    The Athena Community Office (ACO) has been established by ESA's Athena Science Study Team (ASST) in order to obtain support in performing its tasks assigned by ESA, and most specially in the ASST role as "focal point for the interests of the broad scientific community". The ACO is led by the Instituto de Física de Cantabria (CSIC-UC), and its activities are funded by CSIC and UC. Further ACO contributors are the University of Geneva, MPE and IRAP. In this poster, we present ACO to the Spanish Astronomical Community, informing about its main responsibilities, which are: assist the ASST in organising and collecting support from the Athena Working Groups and Topical Panels; organise and maintain the documentation generated by the Athena Working Groups and Topical Panels; manage the Working Group and Topical Panel membership lists; assist the ASST in promoting Athena science capabilities in the research world, through conferences and workshops; keep a record of all papers and presentations related to Athena; support the production of ASST documents; produce and distribute regularly an Athena Newsletter, informing the community about all mission and science developments; create and maintain the Athena Community web portal; maintain an active communication activity; promote, organise and support Athena science-related public outreach, in coordination with ESA and other agencies involved when appropriate; and, design, produce materials and provide pointers to available materials produced by other parties. In summary, ACO is meant to become a focal point to facilitate the scientific exchange between the Athena activities and the scientific community at large, and to disseminate the Athena science objectives to the general public.

  2. ATLAS Review Office

    CERN Multimedia

    Szeless, B

    The ATLAS internal reviews, be it the mandatory Production Readiness Reviews, the now newly installed Production Advancement Reviews, or the more and more requested different Design Reviews, have become a part of our ATLAS culture over the past years. The Activity Systems Status Overviews are, for the time being, a one in time event and should be held for each system as soon as possible to have some meaning. There seems to a consensus that the reviews have become a useful project tool for the ATLAS management but even more so for the sub-systems themselves making achievements as well as possible shortcomings visible. One other recognized byproduct is the increasing cross talk between the systems, a very important ingredient to make profit all the systems from the large collective knowledge we dispose of in ATLAS. In the last two months, the first two PARs were organized for the MDT End Caps and the TRT Barrel Modules, both part of the US contribution to the ATLAS Project. Furthermore several different design...

  3. Ronald Breslow (1931–2017)

    Indian Academy of Sciences (India)

    of action of thiamine, commonly known as Vitamin. B1, which acts ... some involving photochemistry and radical reaction processes (e.g. remote functionalization). Another ... freshman chemistry and was an extremely popular instructor. He was ...

  4. Autobiography of Ronald W. Rousseau.

    Science.gov (United States)

    Rousseau, Ronald W

    2018-03-01

    This article provides a synopsis of my professional career, from the decision to study chemical engineering to leadership of one of the top academic programs in that field. I describe how I chose to devote my research to phenomena associated with crystallization as practiced for separation and purification and then made the transition to leader of an academic program. Embedded in the coverage are descriptions of research advances coming from exploration of secondary nucleation, especially how collisions of crystals in supersaturated environments dominate the behavior of industrially relevant crystallization processes. I recount some of the challenges associated with becoming a school chair and how the program I led grew. The story illuminates the contributions of my many mentors, colleagues, and students. Expected final online publication date for the Annual Review of Chemical and Biomolecular Engineering Volume 9 is June 7, 2018. Please see http://www.annualreviews.org/page/journal/pubdates for revised estimates.

  5. 12 CFR 1710.17 - Certification of disclosures by chief executive officer and chief financial officer.

    Science.gov (United States)

    2010-01-01

    ... officer and chief financial officer. 1710.17 Section 1710.17 Banks and Banking OFFICE OF FEDERAL HOUSING... Corporate Practices and Procedures § 1710.17 Certification of disclosures by chief executive officer and chief financial officer. The chief executive officer and the chief financial officer of an Enterprise...

  6. RISK MANAGEMENT USING PROJECT RECON

    Science.gov (United States)

    2016-11-28

    centralized database . • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any...Create growth plans to proactively capture benefits • Customize reports to group opportunities by programmatic, technical, business, contracting, and

  7. 75 FR 2549 - Office of Biotechnology Activities; Office of Science Policy; Office of the Director; Notice of a...

    Science.gov (United States)

    2010-01-15

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Office of Biotechnology... Coordinator, Office of Biotechnology Activities, Office of Science Policy, Office of the Director, National..., Office of Biotechnology Activities, National Institutes of Health. [FR Doc. 2010-730 Filed 1-14-10; 8:45...

  8. Automated Office Blood Pressure Measurement.

    Science.gov (United States)

    Myers, Martin G

    2018-04-01

    Manual blood pressure (BP) recorded in routine clinical practice is relatively inaccurate and associated with higher readings compared to BP measured in research studies in accordance with standardized measurement guidelines. The increase in routine office BP is the result of several factors, especially the presence of office staff, which tends to make patients nervous and also allows for conversation to occur. With the disappearance of the mercury sphygmomanometer because of environmental concerns, there is greater use of oscillometric BP recorders, both in the office setting and elsewhere. Although oscillometric devices may reduce some aspects of observer BP measurement error in the clinical setting, they are still associated with higher BP readings, known as white coat hypertension (for diagnosis) or white coat effect (with treated hypertension). Now that fully automated sphygmomanometers are available which are capable of recording several readings with the patient resting quietly, there is no longer any need to have office staff present when BP is being recorded. Such readings are called automated office blood pressure (AOBP) and they are both more accurate than conventional manual office BP and not associated with the white coat phenomena. AOBP readings are also similar to the awake ambulatory BP and home BP, both of which are relatively good predictors of cardiovascular risk. The available evidence suggests that AOBP should now replace manual or electronic office BP readings when screening patients for hypertension and also after antihypertensive drug therapy is initiated. Copyright © 2018. The Korean Society of Cardiology.

  9. Ship Sensor Observations for Deep Sea Medicines 2003 - Office of Ocean Exploration

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Hourly measurements made by selected ship sensors on the NOAA ship Ronald H. Brown during the "Deep Sea Medicines 2003: Exploration of the Gulf of Mexico" expedition...

  10. Ship Sensor Observations for North Atlantic Stepping Stones 2005 - Office of Ocean Exploration

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Hourly measurements made by selected ship sensors on the NOAA ship Ronald H. Brown during the "North Atlantic Stepping Stones 2005" expedition sponsored by the...

  11. Ship Track for Deep Sea Medicines 2003 - Office of Ocean Exploration

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Ship track of the Ronald H. Brown during the "Deep Sea Medicines 2003: Exploring the Gulf of Mexico" expedition sponsored by the National Oceanic and Atmospheric...

  12. Office of Equal Opportunity Programs

    Science.gov (United States)

    Chin, Jennifer L.

    2004-01-01

    The NASA Glenn Office of Equal Opportunity Programs works to provide quality service for all programs and/or to assist the Center in becoming a model workplace. During the summer of 2004, I worked with Deborah Cotleur along with other staff members to create and modify customer satisfaction surveys. This office aims to assist in developing a model workplace by providing functions as a change agent to the center by serving as an advisor to management to ensure equity throughout the Center. In addition, the office serves as a mediator for the Center in addressing issues and concerns. Lastly, the office provides assistance to employees to enable attainment of personal and organizational goals. The Office of Equal Opportunities is a staff office which reports and provides advice to the Center Director and Executive Leadership, implements laws, regulations, and presidential executive orders, and provides center wide leadership and assistance to NASA GRC employees. Some of the major responsibilities of the office include working with the discrimination complaints program, special emphasis programs (advisory groups), management support, monitoring and evaluation, contract compliance, and community outreach. During my internship in this office, my main objective was to create four customer satisfaction surveys based on EO retreats, EO observances, EO advisory boards, and EO mediation/counseling. I created these surveys after conducting research on past events and surveys as well as similar survey research created and conducted by other NASA centers, program for EO Advisory group members, leadership training sessions for supervisors, preventing sexual harassment training sessions, and observance events. I also conducted research on the style and format from feedback surveys from the Marshall Equal Opportunity website, the Goddard website, and the main NASA website. Using the material from the Office of Equal Opportunity Programs at Glenn Research Center along with my

  13. Smart Gun Technology project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Weiss, D.R.

    1996-05-01

    The goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user form firing a law officer`s firearm by implementing user-recognizing-and-authorizing (or {open_quotes}smart{close_quotes}) surety technologies. This project was funded by the National Institute of Justice. This report lists the findings and results of the project`s three primary objectives. First, to find and document the requirements for a smart firearm technology that law enforcement officers will value. Second, to investigate, evaluate, and prioritize technologies that meet the requirements for a law enforcement officer`s smart firearm. Third, to demonstrate and document the most promising technology`s usefulness in models of a smart firearm.

  14. Coding for urologic office procedures.

    Science.gov (United States)

    Dowling, Robert A; Painter, Mark

    2013-11-01

    This article summarizes current best practices for documenting, coding, and billing common office-based urologic procedures. Topics covered include general principles, basic and advanced urologic coding, creation of medical records that support compliant coding practices, bundled codes and unbundling, global periods, modifiers for procedure codes, when to bill for evaluation and management services during the same visit, coding for supplies, and laboratory and radiology procedures pertinent to urology practice. Detailed information is included for the most common urology office procedures, and suggested resources and references are provided. This information is of value to physicians, office managers, and their coding staff. Copyright © 2013 Elsevier Inc. All rights reserved.

  15. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    : analysis of results of planning the project scope; study of templates of project works’ structures, recommendations for the formation of levels of structure; decomposition of the totality of project work; creating a dictionary of the project work structure; updating the description of the project scope and the project scope management plan. Practical importance. In order to improve the management of the scope of projects in the pharmacy, the components of subprocesses, participants, input and output documents are investigated and the algorithm for managing the project scope is built. It is determined that the starting elements of project scope management are the justification of the initial data, i.e. the project purpose, impacts of the environment and the internal potential of the enterprise in relation to the project implementation (assets of the organizational process. It is recommended to create a structure of project work starting from the analytical research existing at the enterprise or recommended by standards and guidelines on project management approaches to building a hierarchical structure of works, templates of project work structures. It is noted that the created structure of project work should be audited by participants of the project office. According to the results of planning the sequence and duration of operations for managing the scope of works, a precedence diagram of the investigated process is constructed. Value/originality. The developed recommendations regarding the consistency and structure of subprocesses and operations of the project scope management will allow the enterprise to significantly save time for planning the scope of subsequent projects, using the database created in previous periods, statistics on the implementation of the described operations.

  16. Program Officer | CRDI - Centre de recherches pour le ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Liaises with program colleagues in Ottawa and the regional offices on issues of project development and management;; Assists senior team members in the identifying, developing and managing IDRC's contacts with other international agencies and Canadian institutions;; Contributes to Centre-wide public relations efforts ...

  17. 29 CFR 401.18 - Office.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 2 2010-07-01 2010-07-01 false Office. 401.18 Section 401.18 Labor Regulations Relating to Labor OFFICE OF LABOR-MANAGEMENT STANDARDS, DEPARTMENT OF LABOR LABOR-MANAGEMENT STANDARDS MEANING OF TERMS USED IN THIS SUBCHAPTER § 401.18 Office. Office means the Office of Labor-Management Standards...

  18. 49 CFR 1325.3 - Federal office.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Federal office. 1325.3 Section 1325.3... FEDERAL OFFICE OR THEIR REPRESENTATIVES § 1325.3 Federal office. For the purposes of this section, Federal office means the office of President or Vice President of the United States; or of Senator or...

  19. 12 CFR 561.34 - Office.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Office. 561.34 Section 561.34 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY DEFINITIONS FOR REGULATIONS AFFECTING ALL SAVINGS ASSOCIATIONS § 561.34 Office. The term Office means the Office as established in section 3 of the...

  20. 12 CFR 583.13 - Office.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Office. 583.13 Section 583.13 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY DEFINITIONS FOR REGULATIONS AFFECTING SAVINGS AND LOAN HOLDING COMPANIES § 583.13 Office. The term Office means the Office of Thrift Supervision. ...

  1. 12 CFR 4.4 - Washington office.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Washington office. 4.4 Section 4.4 Banks and... EXAMINERS Organization and Functions § 4.4 Washington office. The Washington office of the OCC is the main office and headquarters of the OCC. The Washington office directs OCC policy, oversees OCC operations...

  2. Temperature and salinity profiles from CTD casts from NOAA Ship RONALD H. BROWN in the SE Pacific (limit -140 W) as part of the East Pacific Investigations of Climate Processes in the Coupled Ocean-Atmosphere from 2001-02-01 to 2001-03-08 (NODC Accession 0000660)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — CTD and other data were collected from NOAA Ship RONALD H. BROWN in the SE Pacific (limit-140 W) from from 01 February 2001 to 08 March 2001. CTD data consist of...

  3. Temperature and salinity profiles from CTD casts from NOAA Ship RONALD H. BROWN and NOAA Ship KA'IMIMOANA in the NE and SW Pacific as part of the Global Ocean-Atmosphere-Land System (GOALS) / Pan American Climate Studies (PACS) from 2001-01-14 to 2001-12-05 (NODC Accession 0000658)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — CTD and other data were collected from NOAA Ship RONALD H. BROWN and NOAA Ship KA'IMIMOANA in the NE and SW Pacific from 14 January 2001 to 05 December 2001. CTD...

  4. Dissolved oxygen, temperature, salinity, and other variables measured from profile observations using CTD and other instruments from NOAA Ship Ronald H. Brown in the East Coast of the United States and Gulf of Mexico during the second Gulf of Mexico and East Coast Carbon (GOMECC-2) Cruise from 2012-07-24 to 2012-08-13 (NODC Accession 0117943)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The second Gulf of Mexico and East Coast Carbon (GOMECC-2) Cruise on board NOAA Ship Ronald H. Brown from Miami, took place in the Gulf of Mexico and then along the...

  5. 75 FR 10293 - Office of Biotechnology Activities; Office of Science Policy; Office of the Director; Notice of a...

    Science.gov (United States)

    2010-03-05

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Office of Biotechnology... meeting, please contact Ms. Laurie Lewallen, Advisory Committee Coordinator, Office of Biotechnology...: March 1, 2010. Amy P. Patterson, Director, Office of Biotechnology Activities, National Institutes of...

  6. Office Operative Hysteroscopy: An Update.

    Science.gov (United States)

    Salazar, Christina Alicia; Isaacson, Keith B

    2018-02-01

    Hysteroscopy is considered the gold standard for the evaluation of intracavitary pathology in both premenopausal and postmenopausal patients associated with abnormal uterine bleeding, as well as for the evaluation of infertile patients with suspected cavity abnormalities. Office-based operative hysteroscopy allows patients to resume activities immediately and successfully integrates clinical practice into a "see and treat" modality, avoiding the added risks of anesthesia and the inconvenience of the operating room. For 2017, the Centers for Medicare and Medicaid Services has provided a substantial increase in reimbursement for a select number of office-based hysteroscopic procedures. This review provides an update on the indications, equipment, and procedures for office hysteroscopy, as well as the management of complications that may arise within an office-based practice. Copyright © 2018. Published by Elsevier Inc.

  7. Indefinite Reenlistment and Noncommissioned Officers

    National Research Council Canada - National Science Library

    Miller, Laura; Moini, Joy; Sivadasan, Suja; Kavanagh, Jennifer; Shergold, Miriam; Plasmeijer, Ronald

    2007-01-01

    ...) by recognizing them as career soldiers. The Army program requires all soldiers reaching the rank of E-6 with ten years of service to reenlist indefinitely, mirroring the management of officers and eliminating reenlistment paperwork...

  8. ACHP | Tribal Historic Preservation Officers

    Science.gov (United States)

    preservation of significant historic properties. Those functions include identifying and maintaining Working with Section 106 Federal, State, & Tribal Programs Training & Education Publications Search skip specific nav links Home arrow Historic Preservation Programs & Officers arrow THPOs

  9. Office of Personnel Management (OPM)

    Data.gov (United States)

    Social Security Administration — The purpose of this agreement is for SSA to verify SSN information for the Office of Personnel Management. OPM will use the SSN verifications in its investigative...

  10. Office of Aviation Safety Infrastructure -

    Data.gov (United States)

    Department of Transportation — The Office of Aviation Safety Infrastructure (AVS INF) provides authentication and access control to AVS network resources for users. This is done via a distributed...

  11. Ergonomic Training for Tomorrow's Office.

    Science.gov (United States)

    Gross, Clifford M.; Chapnik, Elissa Beth

    1987-01-01

    The authors focus on issues related to the continual use of video display terminals in the office, including safety and health regulations, potential health problems, and the role of training in minimizing work-related health problems. (CH)

  12. Zero energy office building renovation; Energieneutrale kantoorrenovatie

    Energy Technology Data Exchange (ETDEWEB)

    Deguelle, D.; Krijnen, M. [DHV, Amersfoort (Netherlands); Heijnis, J. [cepezed, Delft (Netherlands)

    2011-04-15

    Building Brains has been set up by TNO as a cooperative and started September 21, 2009. The aim of the project was to answer the question how the energy consumption in the Netherlands can be reduced by 50% up to 2030 or how the built environment can be made energy-neutral. This issue of the magazine is dedicated to Building Brains project. Four different renovation concepts are compared: energy-neutral renovation that involves the exclusive use of sustainable generated energy;.the application of the passive construction principles; the use of Double Skin Facades; and decentralized facade-integrated installation techniques. Following the results of this study two optimized refurbishment approaches for a zero energy office are designed. [Dutch] Building Brains is een door TNO opgezet samenwerkingsproject dat op 21 september 2009 van start ging. Het doel van het project is antwoord te geven op de vraag hoe tot 2030 het energiegebruik in Nederland kan worden gehalveerd of hoe de gebouwde omgeving energieneutraal kan worden gemaakt. Deze aflevering van het tijdschrift TVVL is vrijwel geheel gewijd aan het Building Brains project. Er is onderzocht hoe verschillende renovatieconcepten scoren. Er zijn vier renovatieconcepten met elkaar vergeleken: energie neutraal renoveren door middel van duurzame energieopwekking, toepassen van het passiefhuisprincipe, toepassen van een tweedehuidfacade en toepassen van een decentrale, gevel-geintegreerde installatie. Uit de studie kwamen twee geoptimaliseerde concepten voor een energieneutrale kantoorrenovatie naar voren.

  13. OPENING HOURS FOR CARDS OFFICE

    CERN Multimedia

    Human Resources Division

    2001-01-01

    Due to the extra workload generated by the global renewal of French cards and in order to preserve the level of service offered by the cards office, please note that this office will in future be open every morning from 8.30 a.m. to 12.30 p.m. until further notice. The service can be contacted by telephone during the same hours. Thank you for your understanding.

  14. TNT Green Office. NESK Final Report; TNT Green Office, Hoofddorp. NESK Eindrapportage

    Energy Technology Data Exchange (ETDEWEB)

    Van der Spek, C; Van Rheenen, M [OVG Projectontwikkeling, Rotterdam (Netherlands)

    2011-12-15

    The aim of the collaboration between TNT (courier and express services) and Triodos/OVG (bank and project developer) was to realize CO2 free Green Offices in the Netherlands. The building is both developed and exploited by the same parties based on an innovative contract in which design, construction and maintenance and management are arranged. These parties are also responsible for the sustainable energy system of the building [Dutch] Doelstelling van de samenwerking tussen TNT (koerier en expresdiensten) en Triodos/OVG (bank en projectontwikkelaar) was het realiseren van CO2-emissievrije Green Offices in Nederland. Hierbij wordt het gebouw ontwikkeld en geexploiteerd door dezelfde partijen op basis van een innovatief contract waarin ontwerp, bouw, onderhoud en beheer zijn vastgelegd. Deze partijen zijn ook verantwoordelijk voor de duurzame energievoorziening van het gebouw.

  15. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  16. Office of Disease Prevention and Health Promotion

    Science.gov (United States)

    ... Health Literacy Health Care Quality Healthy People healthfinder Office of Disease Prevention and Health Promotion Spotlight: This ... 16/2017 This site is coordinated by the Office of Disease Prevention and Health Promotion, Office of ...

  17. Diversity and Black Officer Integration in the U.S. Marine Corps for 2011 and Beyond

    Science.gov (United States)

    2011-05-06

    Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704..()1BB) Washington. DC...positions as cooks, waiters , janitors, and officers’ servants. Though segregation and exclusion from combat still ruled the day, blacks in the Army were...a team is a leadership concern with diversity implications. The effectiveness of management or the military officer is predicated on that essential

  18. Comfort of workers in office buildings: The European HOPE project

    NARCIS (Netherlands)

    Bluyssen, P.M.; Aries, M.; Dommelen, P. van

    2011-01-01

    Previous studies have shown that building, social and personal factors can influence one's perceived health and comfort. The aim of the underlying study was to get a better understanding of the relationships between these factors and perceived comfort. Self-administered questionnaires from 5732

  19. Robotics Systems Joint Project Office (RSJPO) Interoperability Profiles (IOPS) 101

    Science.gov (United States)

    2012-07-01

    interoperability, although they are supported by some interoperability attributes  For example, stair climbing » Stair climbing is not something that...IOPs need to specify » However, the mobility & actuation related interoperable messages can be used to provide stair climbing » Also...interoperability can enable management of different poses or modes, one of which may be stair climbing R O B O T IC S Y S T E M S J P O L e a d e r s h i p

  20. Legitimidade e decisão: a construção do julgamento dos casos difíceis pela teoria da decisão judicial de Ronald Dworkin

    OpenAIRE

    Aline Prado Silva

    2013-01-01

    O presente trabalho tem por objetivo discutir a teoria proposta por Ronald Dworkin para resolver os casos difíceis pela perspectiva da construção da decisão judicial e da sua legitimidade. A abordagem, no que se refere à decisão, procura esclarecer o conceito de Direito para Dworkin, a teoria da decisão judicial que ele propõe, e, por fim, como se opera a decisão nos casos difíceis, de modo a abordar as etapas da interpretação e o método de Hércules; o poder discricionário do juiz; os direito...

  1. Office 2010 Web Apps For Dummies

    CERN Document Server

    Weverka, Peter

    2010-01-01

    Enhance your Microsoft Office 2010 experience with Office 2010 Web Apps!. Office Web Apps complement Office, making it easy to access and edit files from anywhere. It also simplifies collaboration with those who don't have Microsoft Office on their computers. This helpful book shows you the optimum ways you can use Office Web Apps to save time and streamline your work. Veteran For Dummies author Peter Weverka begins with an introduction to Office Web Apps and then goes on to clearly explain how Office Web Apps provide you with easier, faster, more flexible ways to get things done.: Walks you t

  2. The Retention of Female Unrestricted Line Officers

    National Research Council Canada - National Science Library

    Pecenco, Elena G

    2005-01-01

    This thesis analyzes the retention of female Naval officers, focusing on the relationship between officer selection metrics and retention beyond minimum service obligation and the effect of lateral...

  3. Selected Regional Judicial Officer Cases, 2005 - Present

    Data.gov (United States)

    U.S. Environmental Protection Agency — This dataset contains selected cases involving EPA's Regional Judicial Officers (RJOs) from 2005 to present. EPA's Regional Judicial Officers (RJOs) perform...

  4. 76 FR 53939 - Order of Succession for the Office of the Chief Financial Officer

    Science.gov (United States)

    2011-08-30

    ... Office of the Chief Financial Officer AGENCY: Office of the Secretary, HUD. ACTION: Notice of Order of... Chief Financial Officer. This Order of Succession supersedes all prior Orders of Succession for the Office of the Chief Financial Officer. DATES: Effective Date: August 19, 2011. FOR FURTHER INFORMATION...

  5. 76 FR 69031 - Order of Succession for the Office of the Chief Human Capital Officer

    Science.gov (United States)

    2011-11-07

    ... Office of the Chief Human Capital Officer AGENCY: Office of the Chief Human Capital Officer, HUD. ACTION: Notice of order of succession. SUMMARY: In this notice, the Chief Human Capital Officer for the... Human Capital Officer. DATES: Effective Date: October 20, 2011. FOR FURTHER INFORMATION CONTACT: Lynette...

  6. Office of the Chief Financial Officer 2012 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Kim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2013-01-31

    Fiscal Year 2012 was a year of progress and change in the Office of the Chief Financial Officer (OCFO) organization. The notable accomplishments outlined below strengthened the quality of the OCFO’s stewardship and services in support of the scientific mission of Lawrence Berkeley National Laboratory (LBNL). Three strategies were key to this progress: organizational transformation aligned with our goals; process redesign and effective use of technology to improve efficiency, and innovative solutions to meet new challenges. Over the next year we will continue to apply these strategies to further enhance our contributions to the Lab’s scientific mission. What follows is the budget, funding and costs for the office for FY 2012.

  7. The Western Environmental Technology Office (WETO) Butte, Montana

    International Nuclear Information System (INIS)

    1994-10-01

    This document has been prepared to highlight the research, development, demonstration, testing and evaluation activities funded through the Western Environmental Technology Office (WETO) in Butte, Montana. Technologies and processes described have the potential to enhance DOE's cleanup and waste management efforts, as well as improve US industry's competitiveness in global environmental markets. This information has been assembled from recently produced Office of Technology Development (OTD) documents which highlight technology development activities within each of the OTD program elements. Projects include: Heavy metals contaminated soil project; In Situ remediation integrated program; Minimum additive waste stabilization program; Resource recovery project; Buried waste integrated demonstration; Mixed waste integrated program; Pollution prevention program; and Mine waste technology program

  8. Pathways to Commercial Success: Technologies and Products Supported by the Fuel Cell Technologies Office - 2015

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2016-01-08

    This FY 2015 report updates the results of an effort to identify and document the commercial and emerging (projected to be commercialized within the next 3 to 5 years) hydrogen and fuel cell technologies and products that resulted from U.S. Department of Energy support through the Fuel Cell Technologies Office in the Office of Energy Efficiency and Renewable Energy.

  9. At Home in the Office. A Guide for the Home Worker.

    Science.gov (United States)

    Thomas, Neil; And Others

    This guide provides information to persons interested in establishing a work-at-home program, specifically those in clerical or support staff positions who use modern automated office equipment. The text is divided into two sections. The Home Worker section provides a summary of the At Home in the Office Project, personality characteristics…

  10. Racial Differences in Resolving Conflicts: A Comparison between Black and White Police Officers

    Science.gov (United States)

    Sun, Ivan Y.; Payne, Brian K.

    2004-01-01

    This study examined the behavioral differences between Black and White police officers in handling interpersonal conflicts. Observational and survey data from the Project on Policing Neighborhoods and the 1990 census data were used. Actions taken by officers are examined along two behavioral dimensions: coercion and support. Findings show that…

  11. Towards a new procedure for identifying causes of health and comfort problems in office buildings

    NARCIS (Netherlands)

    Bluyssen, P.M.; Fossati, S.; Mandin, C.; Cattaneo, A.; Carrer, P.

    2012-01-01

    In the European project OFFICAIR a procedure has been prepared for the inventory and identification of associations between possible characteristics of European modern offices (building, sources and events) and health and comfort of office workers, via a questionnaire and a checklist including

  12. Office of Geologic Repositories quality assurance plan for high-level radioactive waste repositories

    International Nuclear Information System (INIS)

    1986-08-01

    This document sets forth geologic repository program-wide quality assurance program requirements and defines management's quality assurance responsibilities for the Office of Geologic Repositories and its projects. (LM)

  13. Notification: Audit of EPA's Office of Criminal Enforcement, Forensics and Training's Law Enforcement Availability Pay Reporting

    Science.gov (United States)

    Project #OA-FY18-0075, November 30, 2017. The EPA OIG plans to begin preliminary research on the EPA Office of Criminal Enforcement, Forensics and Training's (OCEFT's) law enforcement availability pay (LEAP) reporting.

  14. 75 FR 9189 - Office of Special Education and Rehabilitative Services; Overview Information; Assistive...

    Science.gov (United States)

    2010-03-01

    ... DEPARTMENT OF EDUCATION Office of Special Education and Rehabilitative Services; Overview... single budget period of 12 months. The Assistant Secretary for Special Education and Rehabilitative... Secretary for Special Education and Rehabilitative Services may change the maximum project period through a...

  15. 75 FR 9193 - Office of Special Education and Rehabilitative Services; Overview Information; Assistive...

    Science.gov (United States)

    2010-03-01

    ... DEPARTMENT OF EDUCATION Office of Special Education and Rehabilitative Services; Overview... budget period of 12 months. The Assistant Secretary for Special Education and Rehabilitative Services may... for Special Education and Rehabilitative Services may change the maximum project period through a...

  16. 75 FR 47801 - Office of Special Education and Rehabilitative Services; Overview Information; Special...

    Science.gov (United States)

    2010-08-09

    ... DEPARTMENT OF EDUCATION Office of Special Education and Rehabilitative Services; Overview Information; Special Demonstration Programs--Model Demonstration Projects To Improve Outcomes for Individuals.... Alexa Posny, Assistant Secretary for Special Education and Rehabilitative Services. [FR Doc. 2010-19585...

  17. 75 FR 8930 - Office of Elementary and Secondary Education Overview Information; Native Hawaiian Education...

    Science.gov (United States)

    2010-02-26

    ... DEPARTMENT OF EDUCATION Office of Elementary and Secondary Education Overview Information; Native Hawaiian Education Program--Competition for Novice Applicants Notice inviting applications for new awards... Hawaiian Education program is to support innovative projects that enhance the educational services provided...

  18. 75 FR 67989 - Agency Information Collection Activities: Office of Infrastructure Protection; Infrastructure...

    Science.gov (United States)

    2010-11-04

    ... DEPARTMENT OF HOMELAND SECURITY [Docket No. DHS-2010-0084] Agency Information Collection Activities: Office of Infrastructure Protection; Infrastructure Protection Stakeholder Input Project--Generic... comments; New Information Collection Request: 1670-NEW. SUMMARY: The Department of Homeland Security...

  19. Combinatorial Auction Theory Applied to the Selection of Surface Warfare Officer Retention Incentives

    National Research Council Canada - National Science Library

    Denmond, Constance M; Johnson, Derek N; Lewis, Chavius G; Zegley, Christopher R

    2007-01-01

    The purpose of this project is to investigate the potential retention and cost impacts of offering combinations of retention base incentives to members of the Surface Warfare Officer (SWO) community...

  20. 37 CFR 1.414 - The United States Patent and Trademark Office as a Designated Office or Elected Office.

    Science.gov (United States)

    2010-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2010-07-01 2010-07-01 false The United States Patent and Trademark Office as a Designated Office or Elected Office. 1.414 Section 1.414 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES International Processing...

  1. 76 FR 28793 - Office of Biotechnology Activities, Office of Science Policy, Office of the Director; Notice of...

    Science.gov (United States)

    2011-05-18

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Office of Biotechnology Activities, Office of Science Policy, Office of the Director; Notice of Meeting Pursuant to section 10(a) of... Hill, NSABB Program Assistant, NIH Office of Biotechnology Activities, 6705 Rockledge Drive, Suite 750...

  2. 76 FR 3918 - Office of Biotechnology Activities, Office of Science Policy, Office of the Director; Notice of...

    Science.gov (United States)

    2011-01-21

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Office of Biotechnology Activities, Office of Science Policy, Office of the Director; Notice of Meeting Pursuant to section 10(a) of... Assistant NIH Office of Biotechnology Activities, 6705 Rockledge Drive, Suite 750, Bethesda, Maryland 20892...

  3. 76 FR 77240 - Office of Biotechnology Activities, Office of Science Policy, Office of the Director; Notice of...

    Science.gov (United States)

    2011-12-12

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Office of Biotechnology Activities, Office of Science Policy, Office of the Director; Notice of Meeting Pursuant to section 10(d) of..., NSABB Program Assistant, NIH Office of Biotechnology Activities, 6705 Rockledge Drive, Suite 750...

  4. 77 FR 66624 - Office of Biotechnology Activities, Office of Science Policy, Office of the Director; Notice of...

    Science.gov (United States)

    2012-11-06

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Office of Biotechnology Activities, Office of Science Policy, Office of the Director; Notice of Meeting Pursuant to section 10(a) of..., Maryland 20892. Contact Person: Ronna Hill, NSABB Program Assistant, NIH Office of Biotechnology Activities...

  5. 75 FR 15713 - Office of Biotechnology Activities; Office of Science Policy; Office of the Director; Notice of a...

    Science.gov (United States)

    2010-03-30

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Office of Biotechnology... Lewallen, Advisory Committee Coordinator, Office of Biotechnology Activities, Office of Science Policy..., Director, Office of Biotechnology Activities, National Institutes of Health. [FR Doc. 2010-6970 Filed 3-29...

  6. 75 FR 58410 - Office of Biotechnology Activities, Office of Science Policy, Office of the Director; Notice of...

    Science.gov (United States)

    2010-09-24

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES National Institutes of Health Office of Biotechnology Activities, Office of Science Policy, Office of the Director; Notice of Meeting Pursuant to section 10(a) of..., NSABB Program Assistant, NIH Office of Biotechnology Activities, 6705 Rockledge Drive, Suite 750...

  7. Advanced fusion concepts project summaries: 1981

    International Nuclear Information System (INIS)

    1982-03-01

    This report contains descriptions of the activities of all the projects supported by the Advanced Fusion Concepts Branch of the Office of Fusion Energy, US Department of Energy. These descriptions are project summaries of each of the individual projects, and contain the following: title, principle investigators, funding levels, purpose, approach, progress, plans, milestones, graduate students, graduates, other professional staff, and recent publications

  8. Advanced Fusion Concepts project summaries, FY 1982

    International Nuclear Information System (INIS)

    1982-10-01

    This report contains descriptions of the activities of all the projects supported by the Advanced Fusion Concepts Branch of the Office of Fusion Energy, U.S. Department of Energy. These descriptions are project summaries of each of the individual projects, and contain the following: title, principle investigators, funding levels, purpose, approach, progress, plans, milestones, graduate students, graduates, other professional staff, and recent publications

  9. Shippingport Station Decommissioning Project

    International Nuclear Information System (INIS)

    McKernan, M.L.

    1989-01-01

    The Shippingport Atomic Power Station was located on the Ohio River in Shippingport Borough (Beaver County), Pennsylvania, USA. The US Atomic Energy Commission (AEC) constructed the plant in the mid-1950s on a seven and half acre parcel of land leased from Duquesne Light Company (DLC). The purposes were to demonstrate and to develop Pressurized Water Recovery technology and to generate electricity. DLC operated the Shippingport plant under supervision of (the successor to AEC) the Department of Energy (DOE)-Naval Reactors (NR) until operations were terminated on October 1, 1982. NR concluded end-of-life testing and defueling in 1984 and transferred the Station's responsibility to DOE Richland Operations Office (RL), Surplus Facility Management Program Office (SFMPO5) on September 5, 1984. SFMPO subsequently established the Shippingport Station Decommissioning Project and selected General Electric (GE) as the Decommissioning Operations Contractor. This report is intended to provide an overview of the Shippingport Station Decommissioning Project

  10. Tropical Zero Energy Office Building

    DEFF Research Database (Denmark)

    Reimann, Gregers Peter; Kristensen, Poul Erik

    2006-01-01

    The new headquarter for Pusat Tenaga Malaysia is designed to be a Zero Emission Office Building (ZEO). A full range of passive and active energy efficiency measures are implemented such that the building will need no more electricity than what can be produced via its own Building Integrated PV...... lighting. These measures include the use of high efficient lighting controlled according to demand, high efficiency pumps and fans, a high efficiency chiller, and use of energy efficient office equipment. The buildings PV system is connected to the grid. Solar electricity is exported to the grid during...... of 24 – 26 oC can be maintained throughout the office hours. The PV roof of the building serves multiple purposes. During daytime, the roof becomes the powerplant of the building, and during nighttime, the PV roof becomes the “cooling tower” for the chiller. The roof will be covered by a thin water film...

  11. Idaho Operations Office: Technology summary, June 1994

    International Nuclear Information System (INIS)

    1994-06-01

    This document has been prepared by the Department of Energy's (DOE) Environmental Management (EM) Office of Technology Development (OTD) in order to highlight research, development, demonstration, testing, and evaluation (RDDT ampersand E) activities funded through the Idaho Operations Office. Technologies and processes described have the potential to enhance DOE's cleanup and waste management efforts, as well as improve US industry's competitiveness in global environmental markets. OTD programs are designed to make new, innovative, and more cost-effective technologies available for transfer to DOE environmental restoration and waste management end-users. Projects are demonstrated, tested, and evaluated to produce solutions to current problems. Transition of technologies into more advanced stages of development is based upon technological, regulatory, economic, and institutional criteria. New technologies are made available for use in eliminating radioactive, hazardous, and other wastes in compliance with regulatory mandates. The primary goal is to protect human health and prevent further contamination. OTD's technology development programs address three major problem areas: (1) groundwater and soils cleanup; (2) waste retrieval and processing; and (3) pollution prevention. These problems are not unique to DOE, but are associated with other Federal agency and industry sites as well. Thus, technical solutions developed within OTD programs will benefit DOE, and should have direct applications in outside markets

  12. Programs of the Office of Energy Research

    International Nuclear Information System (INIS)

    1985-07-01

    The purpose of this research has been to support the energy technology development programs by providing insight into fundamental science and associated phenomena and developing new or advanced concepts and techniques. Today, this responsibility rests with the Office of Energy Research (ER), DOE, whose present programs have their origins in pioneering energy-related research which was initiated nearly 40 years ago. The Director, Office of Energy Research, also acts as the chief scientist and scientific advisor to the Secretary of Energy for the entire spectrum of energy research and development (R and D) programs of the Department. ER programs include several thousand individual projects and hundreds of laboratories, universities, and other research facilities throughout the United States. The current organization of ER is shown. The budgets for the various ER programs for the last two fiscal years are shown. In the following pages, each of these programs and activities are described briefly for the information of the scientific community and the public at large

  13. Idaho Operations Office: Technology summary, June 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This document has been prepared by the Department of Energy`s (DOE) Environmental Management (EM) Office of Technology Development (OTD) in order to highlight research, development, demonstration, testing, and evaluation (RDDT&E) activities funded through the Idaho Operations Office. Technologies and processes described have the potential to enhance DOE`s cleanup and waste management efforts, as well as improve US industry`s competitiveness in global environmental markets. OTD programs are designed to make new, innovative, and more cost-effective technologies available for transfer to DOE environmental restoration and waste management end-users. Projects are demonstrated, tested, and evaluated to produce solutions to current problems. Transition of technologies into more advanced stages of development is based upon technological, regulatory, economic, and institutional criteria. New technologies are made available for use in eliminating radioactive, hazardous, and other wastes in compliance with regulatory mandates. The primary goal is to protect human health and prevent further contamination. OTD`s technology development programs address three major problem areas: (1) groundwater and soils cleanup; (2) waste retrieval and processing; and (3) pollution prevention. These problems are not unique to DOE, but are associated with other Federal agency and industry sites as well. Thus, technical solutions developed within OTD programs will benefit DOE, and should have direct applications in outside markets.

  14. Oakland Operations Office, Oakland, California: Technology summary

    International Nuclear Information System (INIS)

    1994-11-01

    DOE's Office of Technology Development manages an aggressive national program for applied research, development, demonstration, testing, and evaluation. This program develops high, payoff technologies to clean up the inventory of DOE nuclear component manufacturing sites and to manage DOE-generated waste faster, safer, and cheaper than current environmental cleanup technologies. OTD programs are designed to make new, innovative, and more effective technologies available for transfer to users through progressive development. Projects are demonstrated, tested, and evaluated to produce solutions to current problems. Transition of technologies into more advanced stages of development is based upon technological, regulatory, economic, and institutional criteria. New technologies are made available for use in eliminating radioactive, hazardous, and other wastes in compliance with regulatory mandates. The primary goal is to protect human health and prevent further contamination. OTD technologies address three specific problem areas: (1) groundwater and soils cleanup; (2) waste retrieval and processing; and (3) pollution prevention

  15. Oakland Operations Office, Oakland, California: Technology summary

    Energy Technology Data Exchange (ETDEWEB)

    1994-11-01

    DOE`s Office of Technology Development manages an aggressive national program for applied research, development, demonstration, testing, and evaluation. This program develops high, payoff technologies to clean up the inventory of DOE nuclear component manufacturing sites and to manage DOE-generated waste faster, safer, and cheaper than current environmental cleanup technologies. OTD programs are designed to make new, innovative, and more effective technologies available for transfer to users through progressive development. Projects are demonstrated, tested, and evaluated to produce solutions to current problems. Transition of technologies into more advanced stages of development is based upon technological, regulatory, economic, and institutional criteria. New technologies are made available for use in eliminating radioactive, hazardous, and other wastes in compliance with regulatory mandates. The primary goal is to protect human health and prevent further contamination. OTD technologies address three specific problem areas: (1) groundwater and soils cleanup; (2) waste retrieval and processing; and (3) pollution prevention.

  16. The IAU Office of Astronomy Development

    Science.gov (United States)

    Mauduit, Jean-Christophe; Govender, K.

    2014-01-01

    The International Astronomical Union (IAU), the largest body of professional astronomers in the world, has set up the Office of Astronomy for Development (OAD) in partnership with the South African National Research Foundation (NRF). The OAD is located at the South African Astronomical Observatory (SAAO) in Cape Town. Its mission is to realise the IAU's Strategic Plan, which aims to use astronomy as a tool for development. It focuses on the following three main areas: "Universities and Research", "Children and Schools" and "Public Outreach". Eighteen projects worldwide have been funded for 2013 and are currently under way. More will be starting in 2014. The OAD is also setting up regional nodes and language expertise centres around the world. This presentation will describe the ongoing activities of the OAD and plans for the future.

  17. 12 CFR 561.39 - Principal office.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Principal office. 561.39 Section 561.39 Banks and Banking OFFICE OF THRIFT SUPERVISION, DEPARTMENT OF THE TREASURY DEFINITIONS FOR REGULATIONS AFFECTING ALL SAVINGS ASSOCIATIONS § 561.39 Principal office. The term principal office means the home...

  18. 28 CFR 90.19 - State office.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false State office. 90.19 Section 90.19...¢ Training ⢠Officers ⢠Prosecutors) Violence Against Women Formula Grant Program § 90.19 State office. (a... office for the purposes of: (1) Certifying qualifications for funding under this subpart B; (2...

  19. 7 CFR 7.17 - Dual office.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Dual office. 7.17 Section 7.17 Agriculture Office of... STATE, COUNTY AND COMMUNITY COMMITTEES § 7.17 Dual office. (a) County committee membership. A member of... any other county office employee. (b) Community committee membership. A member of the community...

  20. 31 CFR 50.2 - Responsible office.

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Responsible office. 50.2 Section 50.2 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.2 Responsible office. The office responsible for the administration of the...

  1. Owen Barwell - Chief Financial Officer | NREL

    Science.gov (United States)

    Owen Barwell - Chief Financial Officer Owen Barwell - Chief Financial Officer A photo of Owen , analysis, and management. He previously served as the Acting Chief Financial Officer and Deputy Chief Financial Officer of the U.S. Department of Energy (DOE), where he was directly responsible for DOE's

  2. 48 CFR 908.7103 - Office machines.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Office machines. 908.7103... PLANNING REQUIRED SOURCES OF SUPPLIES AND SERVICES Acquisition of Special Items 908.7103 Office machines. Acquisitions of office machines by DOE offices and its authorized contractors shall be in accordance with FPMR...

  3. 77 FR 3506 - Copyright Office Fees

    Science.gov (United States)

    2012-01-24

    ... creativity. The copyright law itself is designed to promote and protect authorship and this includes... LIBRARY OF CONGRESS Copyright Office [Docket No. 2012-1] Copyright Office Fees AGENCY: Copyright Office, Library of Congress. ACTION: Notice of Inquiry; Fees. SUMMARY: The U.S. Copyright Office is in...

  4. 75 FR 47495 - Office of the Ombudsman

    Science.gov (United States)

    2010-08-06

    ... Office of Finance, and any person that has a business relationship with a regulated entity or the Office... entity or the Office of Finance that involves the provision of goods or services. The term business... Office of Finance of the Federal Home Loan Bank System. Person would mean an organization, business...

  5. 7 CFR 2003.14 - Field Offices.

    Science.gov (United States)

    2010-01-01

    ...) ADMINISTRATIVE REGULATIONS ORGANIZATION Functional Organization of the Rural Development Mission Area § 2003.14... Office Program Directors. State Directors may organizationally structure their offices based on the... tier program delivery structure. In a three tier system, Local offices report to an Area office, that...

  6. Project Notes

    Science.gov (United States)

    School Science Review, 1978

    1978-01-01

    Presents sixteen project notes developed by pupils of Chipping Norton School and Bristol Grammar School, in the United Kingdom. These Projects include eight biology A-level projects and eight Chemistry A-level projects. (HM)

  7. The Generalizability of Private Sector Research on Software Project Management in Two USAF Organizations: An Exploratory Study

    National Research Council Canada - National Science Library

    Garman, Michael

    2003-01-01

    ... budget. However, software projects frequently fail to meet these criteria. Software engineers, acquisition officers, and project managers have all studied this issue and made recommendations for achieving success...

  8. Keep handovers in the office.

    Science.gov (United States)

    Richards, Louise

    2017-06-14

    Patient information is meant to be confidential. How is that possible when you give a bedside handover with other patients in the room (Readers' Panel, June 7). Handovers should be done in the office, followed by a walk around to introduce yourself as the nurse taking over the care, and to check on any infusions.

  9. Office Skills: Measuring Typewriting Output.

    Science.gov (United States)

    Petersen, Lois E.; Kruk, Leonard B.

    1978-01-01

    The advent of word processing centers has provided typewriting teachers with an alternative measurement system that, instead of penalizing errors, grades students according to Usable Lines Produced (ULP). The ULP system is job-oriented and promotes realistic office standards in typewriting productivity. (MF)

  10. Enlisted or Officer Drone Pilots

    Science.gov (United States)

    2010-04-01

    the property of the United States government. AU/ACSC/Rafnson, Gary B/AY10 3 Abstract This paper compares remotely piloted aircraft— drones ...operations in both the US Army and US Air Force. It argues that officers should continue to pilot Air Force drones because of the increased risks and

  11. Office automation: a look beyond word processing

    OpenAIRE

    DuBois, Milan Ephriam, Jr.

    1983-01-01

    Approved for public release; distribution is unlimited Word processing was the first of various forms of office automation technologies to gain widespread acceptance and usability in the business world. For many, it remains the only form of office automation technology. Office automation, however, is not just word processing, although it does include the function of facilitating and manipulating text. In reality, office automation is not one innovation, or one office system, or one tech...

  12. Pac-Rim LNG project : final project report specifications

    International Nuclear Information System (INIS)

    1996-01-01

    PAC-RIM LNG Inc. has submitted a proposal to the British Columbia Environmental Assessment Office, to develop a liquefied natural gas project which would purchase pipeline quality natural gas from sources in northeast British Columbia and Alberta and transport it via a dedicated pipeline system to a LNG processing plant on tidewater on the Pacific coast. The project would include storage and processing facilities and a marine loading terminal. This document sets out the final project report specifications prepared by the Project Committee on the basis of input received from the public, First Nations and federal, provincial and local governments

  13. NASA's Astronant Family Support Office

    Science.gov (United States)

    Beven, Gary; Curtis, Kelly D.; Holland, Al W.; Sipes, Walter; VanderArk, Steve

    2014-01-01

    During the NASA-Mir program of the 1990s and due to the challenges inherent in the International Space Station training schedule and operations tempo, it was clear that a special focus on supporting families was a key to overall mission success for the ISS crewmembers pre-, in- and post-flight. To that end, in January 2001 the first Family Services Coordinator was hired by the Behavioral Health and Performance group at NASA JSC and matrixed from Medical Operations into the Astronaut Office's organization. The initial roles and responsibilities were driven by critical needs, including facilitating family communication during training deployments, providing mission-specific and other relevant trainings for spouses, serving as liaison for families with NASA organizations such as Medical Operations, NASA management and the Astronaut Office, and providing assistance to ensure success of an Astronaut Spouses Group. The role of the Family Support Office (FSO) has modified as the ISS Program matured and the needs of families changed. The FSO is currently an integral part of the Astronaut Office's ISS Operations Branch. It still serves the critical function of providing information to families, as well as being the primary contact for US and international partner families with resources at JSC. Since crews launch and return on Russian vehicles, the FSO has the added responsibility for coordinating with Flight Crew Operations, the families, and their guests for Soyuz launches, landings, and Direct Return to Houston post-flight. This presentation will provide a summary of the family support services provided for astronauts, and how they have changed with the Program and families the FSO serves. Considerations for future FSO services will be discussed briefly as NASA proposes one year missions and beyond ISS missions. Learning Objective: 1) Obtain an understanding of the reasons a Family Support Office was important for NASA. 2) Become familiar with the services provided for

  14. ORGANIZATIONAL PROJECT MANAGEMENT MATURITY

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2017-11-01

    , and documenting best practices and potential difficulties. Practical implications. For the purposes of the present research, the level of organizational project management maturity of the enterprise in question is evaluated according to the three-level model developed by H. Кеrzner. The conclusion is made that project management maturity of this enterprise corresponds to maturity level 2. Besides, the defined maturity level is specified in more detail along the life cycle phases in order to determine more precisely the position of project management activity of the enterprise within the maturity model. Potential problems (the so-called “bottlenecks” of the enterprise in the field of project management are identified. Based on the results of the analysis, a number of recommendations are suggested for further development of the corporate system of project management at the given enterprise. The results of the research showed that in order to achieve a higher level of maturity, it is necessary to create a project team, organize a project office, and distribute project management functions among the team members, develop a procedure of involving experts with different professional backgrounds into the project implementation, improve the procedure of creating project teams, ensure the accumulation of best practices of project implementation, establish the corporate standard of project management, and improve the strategic planning for project management, project implementation control, managing changes, labour resources and communication. The suggested guidelines are expected to facilitate the achievement of a higher level of maturity. They also envisage the terms of this transition and the responsible executives. Further enhancement of maturity level is achieved by means of performing a set of activities for improving and aligning various project management sub-processes aimed at managing costs, time, quality, and risks. Another important condition of enhancing

  15. RB-10-07 Lophelia II 2010: Oil Seeps and Deep Reefs on NOAA Ship Ronald H. Brown in the Gulf of Mexico between 20101014 and 20101104

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Lophelia II project involves exploration and research of the northern Gulf of Mexico deepwater natural and artificial hard bottom habitats with emphasis on coral...

  16. 78 FR 34655 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Science.gov (United States)

    2013-06-10

    ... CONTACT: Office of Naval Research: Ms. Margaret J. Mitchell, Director, Human Resources Office, Office of... established position management criteria, and (2) Pay Band V of the S&E Professional Career Track require... Personnel Management Demonstration Project, Department of Navy, Office of Naval Research (ONR); Proposed...

  17. 76 FR 67472 - Order of Succession for the Office of the Chief Information Officer

    Science.gov (United States)

    2011-11-01

    ...: Juanita Galbreath, Deputy Chief Information Officer for Cyber Security and Privacy, Office of the Chief...) Deputy Chief Information Officer, for IT Operations; (3) Deputy Chief Information Officer, for Cyber Security and Privacy; (4) Deputy Chief Information Officer, for Business and IT Modernization. These...

  18. A Firsthand Comparison of a System Office to a College Office

    Science.gov (United States)

    Hom, Willard C.

    2010-01-01

    System offices for community college institutional research differ in many ways from campus offices for community college institutional research. The other chapters in this volume describe salient characteristics of system IR offices, but many readers may want to see a direct comparison of system IR offices to campus IR offices in the community…

  19. 76 FR 53935 - Delegation Authority for the Office of the Chief Financial Officer

    Science.gov (United States)

    2011-08-30

    ... Office of the Chief Financial Officer AGENCY: Office of the Secretary, HUD. ACTION: Notice of delegation of authority. SUMMARY: In this notice, the Secretary of HUD, pursuant to the Chief Financial Officers Act of 1990 (CFO Act), which established the position of the Chief Financial Officer within HUD, is...

  20. Office design's impact on sick leave rates.

    Science.gov (United States)

    Bodin Danielsson, Christina; Chungkham, Holendro Singh; Wulff, Cornelia; Westerlund, Hugo

    2014-01-01

    The effect of office type on sickness absence among office employees was studied prospectively in 1852 employees working in (1) cell-offices; (2) shared-room offices; (3) small, (4) medium-sized and (5) large open-plan offices; (6) flex-offices and (7) combi-offices. Sick leaves were self-reported two years later as number of (a) short and (b) long (medically certified) sick leave spells as well as (c) total number of sick leave days. Multivariate logistic regression analysis was used, with adjustment for background factors. A significant excess risk for sickness absence was found only in terms of short sick leave spells in the three open-plan offices. In the gender separate analysis, this remained for women, whereas men had a significantly increased risk in flex-offices. For long sick leave spells, a significantly higher risk was found among women in large open-plan offices and for total number of sick days among men in flex-offices. A prospective study of the office environment's effect on employees is motivated by the high rates of sick leaves in the workforce. The results indicate differences between office types, depending on the number of people sharing workspace and the opportunity to exert personal control as influenced by the features that define the office types.