WorldWideScience

Sample records for project model projections

  1. Projection Models 2010

    DEFF Research Database (Denmark)

    Illerup, J. B.; Birr-Pedersen, K.; Mikkelsen, M. H

    Models for projection of SO2-, NOx-, NMVOC- and NH3-emissions to the atmosphere have been developed and the Danish emissions have been projected until 2010 from a basis scenario including all implemented and planned measures. The projections of the four pollutants indicate that it may be difficult...

  2. Competency model for the project managers of technical projects

    Science.gov (United States)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  3. INDICATIVE MODEL OF DEVIATIONS IN PROJECT

    Directory of Open Access Journals (Sweden)

    Олена Борисівна ДАНЧЕНКО

    2016-02-01

    Full Text Available The article shows the process of constructing the project deviations indicator model. It based on a conceptual model of project deviations integrated management (PDIM. During the project different causes (such as risks, changes, problems, crises, conflicts, stress lead to deviations of integrated project indicators - time, cost, quality, and content. For a more detailed definition of where in the project deviations occur and how they are dangerous for the whole project, it needs to develop an indicative model of project deviations. It allows identifying the most dangerous deviations that require PDIM. As a basis for evaluation of project's success has been taken famous model IPMA Delta. During the evaluation, IPMA Delta estimated project management competence of organization in three modules: I-Module ("Individuals" - a self-assessment personnel, P-module ("Projects" - self-assessment of projects and/or programs, and O-module ("Organization" - used to conduct interviews with selected people during auditing company. In the process of building an indicative model of deviations in the project, the first step is the assessment of project management in the organization by IPMA Delta. In the future, built cognitive map and matrix of system interconnections of the project, which conducted simulations and built a scale of deviations for the selected project. They determined a size and place of deviations. To identify the detailed causes of deviations in the project management has been proposed to use the extended system of indicators, which is based on indicators of project management model Project Excellence. The proposed indicative model of deviations in projects allows to estimate the size of variation and more accurately identify the place of negative deviations in the project and provides the project manager information for operational decision making for the management of deviations in the implementation of the project

  4. Naesliden project: FEM modelling strategies

    Energy Technology Data Exchange (ETDEWEB)

    Borg, T.

    1980-05-15

    A schematized description is given of the different stages in the project. The aim is to show the development of the project and the strategies which have been chosen. The four different stages in the project are treated from the following points of view: the reasons for the choice of material models; the determination of model properties; and the control of the calculated values. In the origin plan for the project it was stated to only use a joint element model. However, it was shown to be a reasonable strategy to use both a general linear elastic model and a geometric restricted model with joint elements. During the course of the Project's development stages, it was found that a reduction in the number of rock types could be made without loss of generality. A modified strategy is suggested based on more studies of the rock bahavior and less advanced calculations in the first stages of the project.

  5. Beyond theory : Towards a probabilistic causation model to support project governance in infrastructure projects

    NARCIS (Netherlands)

    Chivatá Cárdenas, Ibsen; Voordijk, Johannes T.; Dewulf, Geert

    2017-01-01

    A new project governance model for infrastructure projects is described in this paper. This model contains causal mechanisms that relate a number of project governance variables to project performance. Our proposed model includes relevant variables for measuring project governance in construction

  6. Constrained bayesian inference of project performance models

    OpenAIRE

    Sunmola, Funlade

    2013-01-01

    Project performance models play an important role in the management of project success. When used for monitoring projects, they can offer predictive ability such as indications of possible delivery problems. Approaches for monitoring project performance relies on available project information including restrictions imposed on the project, particularly the constraints of cost, quality, scope and time. We study in this paper a Bayesian inference methodology for project performance modelling in ...

  7. World energy projection system: Model documentation

    Science.gov (United States)

    1992-06-01

    The World Energy Project System (WEPS) is an accounting framework that incorporates projects from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product) and about the rate of incremental energy requirements met by hydropower, geothermal, coal, and natural gas to produce projections of world energy consumption published annually by the Energy Information Administration (EIA) in the International Energy Outlook (IEO). Two independently documented models presented in Figure 1, the Oil Market Simulation (OMS) model and the World Integrated Nuclear Evaluation System (WINES), provide projections of oil and nuclear power consumption published in the IEO. Output from a third independently documented model, and the International Coal Trade Model (ICTM), is not published in the IEO but is used in WEPS as a supply check on projections of world coal consumption produced by WEPS and published in the IEO. A WEPS model of natural gas production documented in this report provides the same type of implicit supply check on the WEPS projections of world natural gas consumption published in the IEO. Two additional models are included in Figure 1, the OPEC Capacity model and the Non-OPEC Oil Production model. These WEPS models provide inputs to the OMS model and are documented in this report.

  8. World energy projection system: Model documentation

    International Nuclear Information System (INIS)

    1992-06-01

    The World Energy Project System (WEPS) is an accounting framework that incorporates projects from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product) and about the rate of incremental energy requirements met by hydropower, geothermal, coal, and natural gas to produce projections of world energy consumption published annually by the Energy Information Administration (EIA) in the International Energy Outlook (IEO) (Figure 1). Two independently documented models presented in Figure 1, the Oil Market Simulation (OMS) model and the World Integrated Nuclear Evaluation System (WINES) provide projections of oil and nuclear power consumption published in the IEO. Output from a third independently documented model, and the International Coal Trade Model (ICTM), is not published in the IEO but is used in WEPS as a supply check on projections of world coal consumption produced by WEPS and published in the IEO. A WEPS model of natural gas production documented in this report provides the same type of implicit supply check on the WEPS projections of world natural gas consumption published in the IEO. Two additional models are included in Figure 1, the OPEC Capacity model and the Non-OPEC Oil Production model. These WEPS models provide inputs to the OMS model and are documented in this report

  9. Dealing with project complexity by matrix-based propagation modelling for project risk analysis

    OpenAIRE

    Fang , Chao; Marle , Franck

    2012-01-01

    International audience; Engineering projects are facing a growing complexity and are thus exposed to numerous and interdependent risks. In this paper, we present a quantitative method for modelling propagation behaviour in the project risk network. The construction of the network requires the involvement of the project manager and related experts using the Design Structure Matrix (DSM) method. A matrix-based risk propagation model is introduced to calculate risk propagation and thus to re-eva...

  10. World Energy Projection System model documentation

    International Nuclear Information System (INIS)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA

  11. World Energy Projection System model documentation

    Energy Technology Data Exchange (ETDEWEB)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA.

  12. Teaching mathematical modelling through project work

    DEFF Research Database (Denmark)

    Blomhøj, Morten; Kjeldsen, Tinne Hoff

    2006-01-01

    are reported in manners suitable for internet publication for colleagues. The reports and the related discussions reveal interesting dilemmas concerning the teaching of mathematical modelling and how to cope with these through “setting the scene” for the students modelling projects and through dialogues......The paper presents and analyses experiences from developing and running an in-service course in project work and mathematical modelling for mathematics teachers in the Danish gymnasium, e.g. upper secondary level, grade 10-12. The course objective is to support the teachers to develop, try out...... in their own classes, evaluate and report a project based problem oriented course in mathematical modelling. The in-service course runs over one semester and includes three seminars of 3, 1 and 2 days. Experiences show that the course objectives in general are fulfilled and that the course projects...

  13. Multi-Agent Modeling in Managing Six Sigma Projects

    Directory of Open Access Journals (Sweden)

    K. Y. Chau

    2009-10-01

    Full Text Available In this paper, a multi-agent model is proposed for considering the human resources factor in decision making in relation to the six sigma project. The proposed multi-agent system is expected to increase the acccuracy of project prioritization and to stabilize the human resources service level. A simulation of the proposed multiagent model is conducted. The results show that a multi-agent model which takes into consideration human resources when making decisions about project selection and project team formation is important in enabling efficient and effective project management. The multi-agent modeling approach provides an alternative approach for improving communication and the autonomy of six sigma projects in business organizations.

  14. Testing Software Development Project Productivity Model

    Science.gov (United States)

    Lipkin, Ilya

    Software development is an increasingly influential factor in today's business environment, and a major issue affecting software development is how an organization estimates projects. If the organization underestimates cost, schedule, and quality requirements, the end results will not meet customer needs. On the other hand, if the organization overestimates these criteria, resources that could have been used more profitably will be wasted. There is no accurate model or measure available that can guide an organization in a quest for software development, with existing estimation models often underestimating software development efforts as much as 500 to 600 percent. To address this issue, existing models usually are calibrated using local data with a small sample size, with resulting estimates not offering improved cost analysis. This study presents a conceptual model for accurately estimating software development, based on an extensive literature review and theoretical analysis based on Sociotechnical Systems (STS) theory. The conceptual model serves as a solution to bridge organizational and technological factors and is validated using an empirical dataset provided by the DoD. Practical implications of this study allow for practitioners to concentrate on specific constructs of interest that provide the best value for the least amount of time. This study outlines key contributing constructs that are unique for Software Size E-SLOC, Man-hours Spent, and Quality of the Product, those constructs having the largest contribution to project productivity. This study discusses customer characteristics and provides a framework for a simplified project analysis for source selection evaluation and audit task reviews for the customers and suppliers. Theoretical contributions of this study provide an initial theory-based hypothesized project productivity model that can be used as a generic overall model across several application domains such as IT, Command and Control

  15. Comparison of additive (absolute) risk projection models and multiplicative (relative) risk projection models in estimating radiation-induced lifetime cancer risk

    International Nuclear Information System (INIS)

    Kai, Michiaki; Kusama, Tomoko

    1990-01-01

    Lifetime cancer risk estimates depend on risk projection models. While the increasing lengths of follow-up observation periods of atomic bomb survivors in Hiroshima and Nagasaki bring about changes in cancer risk estimates, the validity of the two risk projection models, the additive risk projection model (AR) and multiplicative risk projection model (MR), comes into question. This paper compares the lifetime risk or loss of life-expectancy between the two projection models on the basis of BEIR-III report or recently published RERF report. With Japanese cancer statistics the estimates of MR were greater than those of AR, but a reversal of these results was seen when the cancer hazard function for India was used. When we investigated the validity of the two projection models using epidemiological human data and animal data, the results suggested that MR was superior to AR with respect to temporal change, but there was little evidence to support its validity. (author)

  16. K3 projective models in scrolls

    CERN Document Server

    Johnsen, Trygve

    2004-01-01

    The exposition studies projective models of K3 surfaces whose hyperplane sections are non-Clifford general curves. These models are contained in rational normal scrolls. The exposition supplements standard descriptions of models of general K3 surfaces in projective spaces of low dimension, and leads to a classification of K3 surfaces in projective spaces of dimension at most 10. The authors bring further the ideas in Saint-Donat's classical article from 1974, lifting results from canonical curves to K3 surfaces and incorporating much of the Brill-Noether theory of curves and theory of syzygies developed in the mean time.

  17. A Model of Project and Organisational Dynamics

    Directory of Open Access Journals (Sweden)

    Jenny Leonard

    2012-04-01

    Full Text Available The strategic, transformational nature of many information systems projects is now widely understood. Large-scale implementations of systems are known to require significant management of organisational change in order to be successful. Moreover, projects are rarely executed in isolation – most organisations have a large programme of projects being implemented at any one time. However, project and value management methodologies provide ad hoc definitions of the relationship between a project and its environment. This limits the ability of an organisation to manage the larger dynamics between projects and organisations, over time, and between projects. The contribution of this paper, therefore, is to use literature on organisational theory to provide a more systematic understanding of this area. The organisational facilitators required to obtain value from a project are categorised, and the processes required to develop those facilitators are defined. This formalisation facilitates generalisation between projects and highlights any time and path dependencies required in developing organisational facilitators. The model therefore has the potential to contribute to the development of IS project management theory within dynamic organisational contexts. Six cases illustrate how this model could be used.

  18. Spiral model pilot project information model

    Science.gov (United States)

    1991-01-01

    The objective was an evaluation of the Spiral Model (SM) development approach to allow NASA Marshall to develop an experience base of that software management methodology. A discussion is presented of the Information Model (IM) that was used as part of the SM methodology. A key concept of the SM is the establishment of an IM to be used by management to track the progress of a project. The IM is the set of metrics that is to be measured and reported throughout the life of the project. These metrics measure both the product and the process to ensure the quality of the final delivery item and to ensure the project met programmatic guidelines. The beauty of the SM, along with the IM, is the ability to measure not only the correctness of the specification and implementation of the requirements but to also obtain a measure of customer satisfaction.

  19. Developing Project Duration Models in Software Engineering

    Institute of Scientific and Technical Information of China (English)

    Pierre Bourque; Serge Oligny; Alain Abran; Bertrand Fournier

    2007-01-01

    Based on the empirical analysis of data contained in the International Software Benchmarking Standards Group(ISBSG) repository, this paper presents software engineering project duration models based on project effort. Duration models are built for the entire dataset and for subsets of projects developed for personal computer, mid-range and mainframeplatforms. Duration models are also constructed for projects requiring fewer than 400 person-hours of effort and for projectsre quiring more than 400 person-hours of effort. The usefulness of adding the maximum number of assigned resources as asecond independent variable to explain duration is also analyzed. The opportunity to build duration models directly fromproject functional size in function points is investigated as well.

  20. Sharks, Minnows, and Wheelbarrows: Calculus Modeling Projects

    Science.gov (United States)

    Smith, Michael D.

    2011-01-01

    The purpose of this article is to present two very active applied modeling projects that were successfully implemented in a first semester calculus course at Hollins University. The first project uses a logistic equation to model the spread of a new disease such as swine flu. The second project is a human take on the popular article "Do Dogs Know…

  1. The INTRACOIN model comparison project

    International Nuclear Information System (INIS)

    Lawson, G.

    1982-01-01

    The International Nuclide Transport Code Intercomparison (INTRACOIN) project is investigating the different models and associated computer codes describing the transport of radionuclides in flowing ground-water following the disposal of solid radioactive wastes in geologic formations. Level I of the project has shown good agreement in the numerical accuracy of most of the codes. In Level II the ability of the codes to model field experiments with radioactive tracers will be compared. Level III will show to what extent the adoption of different models and computer codes for the transport of radionuclides with ground water affects the results of repository assessments. (U.K.)

  2. EXPENSES FORECASTING MODEL IN UNIVERSITY PROJECTS PLANNING

    Directory of Open Access Journals (Sweden)

    Sergei A. Arustamov

    2016-11-01

    Full Text Available The paper deals with mathematical model presentation of cash flows in project funding. We describe different types of expenses linked to university project activities. Problems of project budgeting that contribute most uncertainty have been revealed. As an example of the model implementation we consider calculation of vacation allowance expenses for project participants. We define problems of forecast for funds reservation: calculation based on methodology established by the Ministry of Education and Science calculation according to the vacation schedule and prediction of the most probable amount. A stochastic model for vacation allowance expenses has been developed. We have proposed methods and solution of the problems that increase the accuracy of forecasting for funds reservation based on 2015 data.

  3. Financial and organizational models of NPP construction projects

    International Nuclear Information System (INIS)

    Ivanov, Timur

    2010-01-01

    The recent evolution of financial and organizational models of NPP projects can be truly reputed to open a new page of the world market of NPP construction. The definition of the concrete model is based mostly on specific cooperation backgrounds and current terms and conditions under which the particular NPP project is being evolved. In this article the most commonly known strategies and schemes of financing structuring for export NPP construction projects are scrutinized. Special attention is paid to the analysis of BOO/BOT models which are based on the public-private partnership. Most BOO/BOT projects in the power sector has Power Purchase Agreements (PPA) as an integral part of them. The PPA key principles are studied here as well. The flexibility and adaptability of the public-private partnership models for financing and organization of the NPP projects contributes substantially to the competitiveness of the NPP projects especially under current economic conditions. (orig.)

  4. Wake models developed during the Wind Shadow project

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, S.; Ott, S.; Pena, A.; Berg, J.; Nielsen, M.; Rathmann, O.; Joergensen, H.

    2011-11-15

    The Wind Shadow project has developed and validated improved models for determining the wakes losses, and thereby the array efficiency of very large, closely packed wind farms. The rationale behind the project has been that the existing software has been covering these types of wind farms poorly, both with respect to the densely packed turbines and the large fetches needed to describe the collective shadow effects of one farm to the next. Further the project has developed the necessary software for the use of the models. Guidelines with recommendations for the use of the models are included in the model deliverables. The project has been carried out as a collaborative project between Risoe DTU, DONG, Vattenfall, DNV and VESTAS, and it has been financed by energinet.dk grant no. 10086. (Author)

  5. Ensemble of regional climate model projections for Ireland

    Science.gov (United States)

    Nolan, Paul; McGrath, Ray

    2016-04-01

    The method of Regional Climate Modelling (RCM) was employed to assess the impacts of a warming climate on the mid-21st-century climate of Ireland. The RCM simulations were run at high spatial resolution, up to 4 km, thus allowing a better evaluation of the local effects of climate change. Simulations were run for a reference period 1981-2000 and future period 2041-2060. Differences between the two periods provide a measure of climate change. To address the issue of uncertainty, a multi-model ensemble approach was employed. Specifically, the future climate of Ireland was simulated using three different RCMs, driven by four Global Climate Models (GCMs). To account for the uncertainty in future emissions, a number of SRES (B1, A1B, A2) and RCP (4.5, 8.5) emission scenarios were used to simulate the future climate. Through the ensemble approach, the uncertainty in the RCM projections can be partially quantified, thus providing a measure of confidence in the predictions. In addition, likelihood values can be assigned to the projections. The RCMs used in this work are the COnsortium for Small-scale MOdeling-Climate Limited-area Modelling (COSMO-CLM, versions 3 and 4) model and the Weather Research and Forecasting (WRF) model. The GCMs used are the Max Planck Institute's ECHAM5, the UK Met Office's HadGEM2-ES, the CGCM3.1 model from the Canadian Centre for Climate Modelling and the EC-Earth consortium GCM. The projections for mid-century indicate an increase of 1-1.6°C in mean annual temperatures, with the largest increases seen in the east of the country. Warming is enhanced for the extremes (i.e. hot or cold days), with the warmest 5% of daily maximum summer temperatures projected to increase by 0.7-2.6°C. The coldest 5% of night-time temperatures in winter are projected to rise by 1.1-3.1°C. Averaged over the whole country, the number of frost days is projected to decrease by over 50%. The projections indicate an average increase in the length of the growing season

  6. Knowledge Model: Project Knowledge Management

    DEFF Research Database (Denmark)

    Durao, Frederico; Dolog, Peter; Grolin, Daniel

    2009-01-01

    The Knowledge model for project management serves several goals:Introducing relevant concepts of project management area for software development (Section 1). Reviewing and understanding the real case requirements from the industrial perspective. (Section 2). Giving some preliminary suggestions...... for usage in KIWI system (Sections 3). This document is intended for technological partners to understand how for example the software development concepts can be applied to a semantic wiki framework....

  7. Project Management in Public Administration. TPM – Total Project Management Maturity Model. The Case of Slovenian Public Administration

    Directory of Open Access Journals (Sweden)

    Gordana ŽURGA

    2018-02-01

    Full Text Available The purpose of the article is to present the importance of project management for the functioning of public administration, and its contribution to the realization of the developmental goals of the government. For this, integration of strategic management and project management is of vital importance. The methodology used is a combination of literature review, a case study of project management in public administration of the Republic of Slovenia, and development of a maturity model of project management in public administration, with its verifi cation on the case of Slovenia. The main contribution of the study is development of TPM – Total Project Management maturity model for public administration. Upon the TPM maturity model, project management in Slovene public administration is assessed and discussed. Out of fi ve maturity levels, the results for project management in Slovene public administration are: management of projects – level 2 (initiated, management of programs of projects – level 2 (initiated, management of portfolios of projects – level 3 (implemented, organizational support for project management – level 3 (implemented, HRM for project management – level 2 (initiated, and integration of project management and strategic management – level 3 (implemented. General fi ndings and recommendations in this respect are drawn, together with indicated areas for possible further research and investigation.

  8. A functional-dynamic reflection on participatory processes in modeling projects.

    Science.gov (United States)

    Seidl, Roman

    2015-12-01

    The participation of nonscientists in modeling projects/studies is increasingly employed to fulfill different functions. However, it is not well investigated if and how explicitly these functions and the dynamics of a participatory process are reflected by modeling projects in particular. In this review study, I explore participatory modeling projects from a functional-dynamic process perspective. The main differences among projects relate to the functions of participation-most often, more than one per project can be identified, along with the degree of explicit reflection (i.e., awareness and anticipation) on the dynamic process perspective. Moreover, two main approaches are revealed: participatory modeling covering diverse approaches and companion modeling. It becomes apparent that the degree of reflection on the participatory process itself is not always explicit and perfectly visible in the descriptions of the modeling projects. Thus, the use of common protocols or templates is discussed to facilitate project planning, as well as the publication of project results. A generic template may help, not in providing details of a project or model development, but in explicitly reflecting on the participatory process. It can serve to systematize the particular project's approach to stakeholder collaboration, and thus quality management.

  9. Modeling Research Project Risks with Fuzzy Maps

    Science.gov (United States)

    Bodea, Constanta Nicoleta; Dascalu, Mariana Iuliana

    2009-01-01

    The authors propose a risks evaluation model for research projects. The model is based on fuzzy inference. The knowledge base for fuzzy process is built with a causal and cognitive map of risks. The map was especially developed for research projects, taken into account their typical lifecycle. The model was applied to an e-testing research…

  10. Model county ordinance for wind projects

    Energy Technology Data Exchange (ETDEWEB)

    Bain, D.A. [Oregon Office of Energy, Portland, OR (United States)

    1997-12-31

    Permitting is a crucial step in the development cycle of a wind project and permits affect the timing, cost, location, feasibility, layout, and impacts of wind projects. Counties often have the lead responsibility for permitting yet few have appropriate siting regulations for wind projects. A model ordinance allows a county to quickly adopt appropriate permitting procedures. The model county wind ordinance developed for use by northwest states is generally applicable across the country and counties seeking to adopt siting or zoning regulations for wind will find it a good starting place. The model includes permitting procedures for wind measurement devices and two types of wind systems. Both discretionary and nondiscretionary standards apply to wind systems and a conditional use permit would be issued. The standards, criteria, conditions for approval, and process procedures are defined for each. Adaptation examples for the four northwest states are provided along with a model Wind Resource Overlay Zone.

  11. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Keywords: Communication skills and leadership model, construction project ..... help a manager handle stress and break tension (Gido & Clements,. 2012: 331; Harrin .... production and management of projects, the higher the demand for.

  12. Modelling the Reduction of Project Making Duration

    Directory of Open Access Journals (Sweden)

    Oleinik Pavel

    2017-01-01

    Full Text Available The article points out why earlier patterns of investment process were ineffective in developing the construction projects and shows sources for reducing of its total duration. It describes the procedure of statistical modeling and obtaining medium-term time parameters required for modern pattern of project-making; offers design formulas for assessment of total time required for project-making as well as for its main stages; reveals advantage of modern system of project-making against traditional one by comparing indicators of their duration.

  13. PROJECT ACTIVITY ANALYSIS WITHOUT THE NETWORK MODEL

    Directory of Open Access Journals (Sweden)

    S. Munapo

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: This paper presents a new procedure for analysing and managing activity sequences in projects. The new procedure determines critical activities, critical path, start times, free floats, crash limits, and other useful information without the use of the network model. Even though network models have been successfully used in project management so far, there are weaknesses associated with the use. A network is not easy to generate, and dummies that are usually associated with it make the network diagram complex – and dummy activities have no meaning in the original project management problem. The network model for projects can be avoided while still obtaining all the useful information that is required for project management. What are required are the activities, their accurate durations, and their predecessors.

    AFRIKAANSE OPSOMMING: Die navorsing beskryf ’n nuwerwetse metode vir die ontleding en bestuur van die sekwensiële aktiwiteite van projekte. Die voorgestelde metode bepaal kritiese aktiwiteite, die kritieke pad, aanvangstye, speling, verhasing, en ander groothede sonder die gebruik van ’n netwerkmodel. Die metode funksioneer bevredigend in die praktyk, en omseil die administratiewe rompslomp van die tradisionele netwerkmodelle.

  14. Modelling of project cash flow on construction projects in Malang city

    Science.gov (United States)

    Djatmiko, Bambang

    2017-09-01

    Contractors usually prepare a project cash flow (PCF) on construction projects. The flow of cash in and cash out within a construction project may vary depending on the owner, contract documents, and construction service providers who have their own authority. Other factors affecting the PCF are down payment, termyn, progress schedule, material schedule, equipment schedule, manpower schedules, and wages of workers and subcontractors. This study aims to describe the cash inflow and cash outflow based on the empirical data obtained from contractors, develop a PCF model based on Halpen & Woodhead's PCF model, and investigate whether or not there is a significant difference between the Halpen & Woodhead's PCF model and the empirical PCF model. Based on the researcher's observation, the PCF management has never been implemented by the contractors in Malang in serving their clients (owners). The research setting is in Malang City because physical development in all field and there are many new construction service providers. The findings in this current study are summarised as follows: 1) Cash in included current assets (20%), owner's down payment (20%), termyin I (5%-25%), termyin II (20%), termyin III (25%), termyin IV (25%) and retention (5%). Cash out included direct cost (65%), indirect cost (20%), and profit + informal cost(15%), 2)the construction work involving the empirical PCF model in this study was started with the funds obtained from DP or current assets and 3) The two models bear several similarities in the upward trends of direct cost, indirect cost, Pro Ic, progress billing, and S-curve. The difference between the two models is the occurrence of overdraft in the Halpen and Woodhead's PCF model only.

  15. The Lunar Phases Project: A Mental Model-Based Observational Project for Undergraduate Nonscience Majors

    Science.gov (United States)

    Meyer, Angela Osterman; Mon, Manuel J.; Hibbard, Susan T.

    2011-01-01

    We present our Lunar Phases Project, an ongoing effort utilizing students' actual observations within a mental model building framework to improve student understanding of the causes and process of the lunar phases. We implement this project with a sample of undergraduate, nonscience major students enrolled in a midsized public university located…

  16. Project management in practice : Evaluating a case project through project management theories

    OpenAIRE

    Uusitalo, Jenni

    2013-01-01

    The purpose of this thesis was to evaluate a case project and to study whether it was carried out in a correct manner; meaning that did the case project follow the project management models. In addition, part of the study was to determine what could have been improved in the management of the case project. The case project was about creating and launching a communication channel based on a social media service, on a blog platform called Tumblr, for Team Finland in Spain network. The network p...

  17. Research on evaluation of enterprise project culture based on Denison model

    Directory of Open Access Journals (Sweden)

    Yucheng Zeng

    2015-05-01

    Full Text Available Purpose: The purpose of this paper is to build enterprise project culture evaluation model and search for the best evaluation method for Chinese enterprise project culture on the basis of studying and drawing lessons from enterprise culture evaluation theory and method at home and abroad. Design/methodology/approach: Referring to the Denison enterprise culture evaluation model, this paper optimizes it according to the difference of enterprise project culture, designs the enterprise project culture evaluation model and proves the practicability of the model through empirical. Finding: This paper finds that it`s more applicable to use the Denison model for enterprise project culture evaluation through the comparative analysis of domestic and foreign enterprise culture evaluation theory and method, the systematic project culture management framework of Chinese enterprises has not yet formed through empirical research, and four factors in enterprise project culture have important influence on project operation performance improvement. Research limitations/implications: The research on evaluation of enterprise project culture based on Denison model is a preliminary attempt, the design of evaluation index system, evaluation model and scale structure also need to be improved, but the thinking of this paper in this field provides a valuable reference for future research. Practical Implications: This paper provides the support of theory and practice for evaluating the present situation of enterprise project culture construction and analyzing the advantages and disadvantages of project culture, which contributes to the "dialectical therapy" of enterprise project management, enterprise management and enterprise project culture construction. Originality/value: The main contribution of this paper is the introduction of Denison enterprise culture model. Combining with the actual situation of enterprises, this paper also builds the evaluation model for

  18. A maturation model for project-based organisations – with uncertainty management as an always remaining multi-project management focus

    Directory of Open Access Journals (Sweden)

    Anna Jerbrant

    2014-02-01

    Full Text Available The classical view of multi-project management does not capture its dynamic nature. Present theory falls short in the expositive dimension of how management of project-based companies evolves because of their need to be agile and adaptable to a changing environment. The purpose of this paper is therefore to present a descriptive model that elucidates the maturation processes in a project-based organization as well as to give an enhanced understanding of multi-project management in practice. The maturation model displays how the management of project-based organizations evolves between structuring administration and managing any uncertainty, and emphasizes the importance of active individual actions and situated management actions that haveto be undertaken in order to coordinate, synchronize, and communicate the required knowledge and skills.The outcomes primarily reveal that, although standardized project models are used and considerable resources are spent on effective project portfolio management, how information and communication are executedis essential for the management of project-based organizations. This is particularly true for informal and non-codified communication.

  19. Finite detector based projection model for super resolution CT

    Energy Technology Data Exchange (ETDEWEB)

    Yu, Hengyong; Wang, Ge [Wake Forest Univ. Health Sciences, Winston-Salem, NC (United States). Dept. of Radiology; Virgina Tech, Blacksburg, VA (United States). Biomedical Imaging Div.

    2011-07-01

    For finite detector and focal spot sizes, here we propose a projection model for super resolution CT. First, for a given X-ray source point, a projection datum is modeled as an area integral over a narrow fan-beam connecting the detector elemental borders and the X-ray source point. Then, the final projection value is expressed as the integral obtained in the first step over the whole focal spot support. An ordered-subset simultaneous algebraic reconstruction technique (OS-SART) is developed using the proposed projection model. In the numerical simulation, our method produces super spatial resolution and suppresses high-frequency artifacts. (orig.)

  20. PROBLEMS OF VALUE-ORIENTED FORMATION OF PROJECT PRODUCT’S MODEL

    Directory of Open Access Journals (Sweden)

    Тигран Георгиевич ГРИГОРЯН

    2015-06-01

    Full Text Available Problems of formation of the project output model related to the complexity of information transmission in the communication between the project participants and stakeholders are considered. The concept of forming a project output model based on allocation of stages of model developing and specification and efficiency of the formation of a model that takes into account the need to plan the project output value creation and transferring to the sponsor and consumers is proposed.

  1. Evaluation model of project complexity for large-scale construction projects in Iran - A Fuzzy ANP approach

    Directory of Open Access Journals (Sweden)

    Aliyeh Kazemi

    2016-09-01

    Full Text Available Construction projects have always been complex. By growing trend of this complexity, implementations of large-scale constructions become harder. Hence, evaluating and understanding these complexities are critical. Correct evaluation of a project complication can provide executives and managers with good source to use. Fuzzy analytic network process (ANP is a logical and systematic approach toward defining, evaluation, and grading. This method allows for analyzing complex systems, and determining complexity of them. In this study, by taking advantage of fuzzy ANP, effective indexes for development of complications in large-scale construction projects in Iran have been determined and prioritized. The results show socio-political, project system interdependencies, and technological complexity indexes ranked top to three. Furthermore, in comparison of three main huge projects: commercial-administrative, hospital, and skyscrapers, the hospital project had been evaluated as the most complicated. This model is beneficial for professionals in managing large-scale projects.

  2. Impact of Project Leadership Facets on Project Outcome

    Directory of Open Access Journals (Sweden)

    Arslan Ayub

    2015-08-01

    Full Text Available The study analyzes the role of project leadership facets on effective project outcome. Numerous such initiatives have already been taken on project outcome/performance in the context of apposite leadership styles or project management. However, the current study is unique in the milieu of project outcome that it introduces a new leadership approach, which throws light on the significance of variant leadership facets on project outcome. The study uses explanatory approach; primary data is collected from project management professionals working in different project organizations. The study uses structural equation model (SEM technique to test the hypothesis. The study found a positive relationship between project leadership facets and project outcome.

  3. DEVELOPMENT MODEL OF PATISSERIE PROJECT-BASED LEARNING

    OpenAIRE

    Ana Ana; Lutfhiyah Nurlaela

    2013-01-01

    The study aims to find a model of patisserie project-based learning with production approach that can improve effectiveness of patisserie learning. Delphi Technique, Cohen's Kappa and percentages of agreements were used to assess model of patisserie project based learning. Data collection techniques employed in the study were questionnaire, check list worksheet, observation, and interview sheets. Subjects were 13 lectures of expertise food and nutrition and 91 students of Food and Nutrition ...

  4. Can model weighting improve probabilistic projections of climate change?

    Energy Technology Data Exchange (ETDEWEB)

    Raeisaenen, Jouni; Ylhaeisi, Jussi S. [Department of Physics, P.O. Box 48, University of Helsinki (Finland)

    2012-10-15

    Recently, Raeisaenen and co-authors proposed a weighting scheme in which the relationship between observable climate and climate change within a multi-model ensemble determines to what extent agreement with observations affects model weights in climate change projection. Within the Third Coupled Model Intercomparison Project (CMIP3) dataset, this scheme slightly improved the cross-validated accuracy of deterministic projections of temperature change. Here the same scheme is applied to probabilistic temperature change projection, under the strong limiting assumption that the CMIP3 ensemble spans the actual modeling uncertainty. Cross-validation suggests that probabilistic temperature change projections may also be improved by this weighting scheme. However, the improvement relative to uniform weighting is smaller in the tail-sensitive logarithmic score than in the continuous ranked probability score. The impact of the weighting on projection of real-world twenty-first century temperature change is modest in most parts of the world. However, in some areas mainly over the high-latitude oceans, the mean of the distribution is substantially changed and/or the distribution is considerably narrowed. The weights of individual models vary strongly with location, so that a model that receives nearly zero weight in some area may still get a large weight elsewhere. Although the details of this variation are method-specific, it suggests that the relative strengths of different models may be difficult to harness by weighting schemes that use spatially uniform model weights. (orig.)

  5. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  6. The performance indicators of model projects. A special evaluation

    International Nuclear Information System (INIS)

    1995-11-01

    As a result of the acknowledgment of the key role of the Model Project concept in the Agency's Technical Co-operation Programme, the present review of the objectives of the model projects which are now in operation, was undertaken, as recommended by the Board of Governors, to determine at an early stage: the extent to which the present objectives have been defined in a measurable way; whether objectively verifiable performance indicators and success criteria had been identified for each project; whether mechanisms to obtain feedback on the achievements had been foreseen. The overall budget for the 23 model projects, as approved from 1994 to 1998, amounts to $32,557,560, of which 45% is funded by Technical Co-operation Fund. This represents an average investment of about $8 million per year, that is over 15% of the annual TC budget. The conceptual importance of the Model Project initiative, as well as the significant funds allocated to them, led the Secretariat to plan the methods to be used to determine their socio-economic impact. 1 tab

  7. Multi-model-based Access Control in Construction Projects

    Directory of Open Access Journals (Sweden)

    Frank Hilbert

    2012-04-01

    Full Text Available During the execution of large scale construction projects performed by Virtual Organizations (VO, relatively complex technical models have to be exchanged between the VO members. For linking the trade and transfer of these models, a so-called multi-model container format was developed. Considering the different skills and tasks of the involved partners, it is not necessary for them to know all the models in every technical detailing. Furthermore, the model size can lead to a delay in communication. In this paper an approach is presented for defining model cut-outs according to the current project context. Dynamic dependencies to the project context as well as static dependencies on the organizational structure are mapped in a context-sensitive rule. As a result, an approach for dynamic filtering of multi-models is obtained which ensures, together with a filtering service, that the involved VO members get a simplified view of complex multi-models as well as sufficient permissions depending on their tasks.

  8. Risk Assessment of Engineering Project Financing Based on PPP Model

    Directory of Open Access Journals (Sweden)

    Ma Qiuli

    2017-01-01

    Full Text Available At present, the project financing channel is single, and the urban facilities are in short supply, and the risk assessment and prevention mechanism of financing should be further improved to reduce the risk of project financing. In view of this, the fuzzy comprehensive evaluation model of project financing risk which combined the method of fuzzy comprehensive evaluation and analytic hierarchy process is established. The scientificalness and effectiveness of the model are verified by the example of the world port project in Luohe city, and it provides basis and reference for engineering project financing based on PPP mode.

  9. Technology Investments in the NASA Entry Systems Modeling Project

    Science.gov (United States)

    Barnhardt, Michael; Wright, Michael; Hughes, Monica

    2017-01-01

    The Entry Systems Modeling (ESM) technology development project, initiated in 2012 under NASAs Game Changing Development (GCD) Program, is engaged in maturation of fundamental research developing aerosciences, materials, and integrated systems products for entry, descent, and landing(EDL)technologies [1]. To date, the ESM project has published over 200 papers in these areas, comprising the bulk of NASAs research program for EDL modeling. This presentation will provide an overview of the projects successes and challenges, and an assessment of future investments in EDL modeling and simulation relevant to NASAs mission

  10. COGNITIVE MODELING AS A METHOD OF QUALITATIVE ANALYSIS OF IT PROJECTS

    Directory of Open Access Journals (Sweden)

    Інна Ігорівна ОНИЩЕНКО

    2016-03-01

    Full Text Available The example project implementing automated CRM-system demonstrated the possibility and features of cognitive modeling in the qualitative analysis of project risks to determine their additional features. Proposed construction of cognitive models of project risks in information technology within the qualitative risk analysis, additional assessments as a method of ranking risk to characterize the relationship between them. The proposed cognitive model reflecting the relationship between the risk of IT project to assess the negative and the positive impact of certain risks for the remaining risks of project implementation of the automated CRM-system. The ability to influence the risk of a fact of other project risks can increase the priority of risk with low impact on results due to its relationship with other project risks.

  11. A model of the environmental impacts of hydropower projects

    International Nuclear Information System (INIS)

    Kemppainen, T.; Haemaelaeinen, I.

    1992-01-01

    The aim was to create a model of the effects of hydropower modernization and extension projects in Finland. To illustrate the effects of hydropower projects a checklist in the form of matrice was constructed. In this matrice all issues that could be significant in future hydropower projects were collected. Stable physical environmental changes are the starting-point for this matrice. The temporary change of hydropower constructions have also been under consideration. These are mainly environmental changes during construction. In chapter two the effects of hydropower modernization and extension projects physical environmental changes were examined. In chapter three the matrice was applied to some example cases. The cases were chosen to represent future hydropower projects. In addition these example cases represent urban areas, rural areas and uninhabited areas. The example cases were the extension of Tainionkoski hydropower plant at Vuoksi river, the modernization of Aeetsae power plant at Kokemaeenjoki river, the modernization of Stadsfors power plant at Lapuanjoki river in the centre of Uusikaarlepyy town and the construction of Kaitfors power plant at Perhonjoki river. Conclusions from usability of the model can be drawn on the ground of the example cases. The purpose of the model is to produce a checklist of estimated environmental effects in hydropower project of various kinds. Examination of issues within the model depends on local circumstances. Endangered animal and plant species, for example, can be studied and estimated only if endangered animal and plant species exist in the area of hydropower plant. Furthermore, the direction and extent of environmental effects depend on the local circumstances. The model is mainly a checklist of environmental effects caused by hydropower plant projects

  12. Modelling in Evaluating a Working Life Project in Higher Education

    Science.gov (United States)

    Sarja, Anneli; Janhonen, Sirpa; Havukainen, Pirjo; Vesterinen, Anne

    2012-01-01

    This article describes an evaluation method based on collaboration between the higher education, a care home and university, in a R&D project. The aim of the project was to elaborate modelling as a tool of developmental evaluation for innovation and competence in project cooperation. The approach was based on activity theory. Modelling enabled a…

  13. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    Full Text Available Modern management theory treats all complex tasks and duties like projects and make these projects possible to be managed by a particular organizational-management concept in order to achieve a goal effectively. A large number of jobs and tasks performed in the system of defense or for defense purposes have the characteristics of projects. Project management is both a skill and a science of monitoring human, material, financial, energy and other resources to achieve required objectives within the given limits: deadlines, time, budget, possibility of realization and the satisfaction of the interests of all project participants. Project management is a traditional area of applied (or functional management focused on managing complex and uncertain situations with defined goals. Introduction In conditions of rapid change and high uncertainty, only adaptive organizations survive, i. e. those that are able not only to react quickly to changes but also to proactively take advantage of changes. Development of project management The biggest influence on the development of the area had complex jobs within the engineering profession. In parallel with the traditional approach new approaches began to develop, while the traditional one still remained in use. Contrary to the traditional engineering approach, a dynamic model first developed in order to respond to demands for greater control of costs. Project management Project management is a skill and knowledge of human and material resources to achieve set objectives within prescribed limits: deadlines, time, budget, possibility of realization, and the satisfaction of all participants in the project. In order to realize a project effectively, it is necessary to manage it rationally. Planning and project management A project plan is a document that allows all team members insight on where to go, when to start and when to arrive, what is necessary to be done in order to achieve the project objectives and what

  14. Innovations in project activities

    Directory of Open Access Journals (Sweden)

    Serbskaya O.V.

    2016-11-01

    Full Text Available this article considers the ways of project management, models of project management: classical model and the model of flexible designing Agile, pays more attention to the process of project management using Agile model and to the problems of using the project management models in modern conditions.

  15. Introduction to Financial Projection Models. Business Management Instructional Software.

    Science.gov (United States)

    Pomeroy, Robert W., III

    This guidebook and teacher's guide accompany a personal computer software program and introduce the key elements of financial projection modeling to project the financial statements of an industrial enterprise. The student will then build a model on an electronic spreadsheet. The guidebook teaches the purpose of a financial model and the steps…

  16. The study of the risk management model of construction project

    International Nuclear Information System (INIS)

    Jiang Bo; Feng Yanping; Liu Changbin

    2010-01-01

    The paper first analyzed the development of the risk management of construction project and the risk management processes, and then briefly introduced the risk management experience of foreign project management. From the project management by objectives point of view, the greatest risk came from the lack of clarity of the objectives in the project management, which led to the project's risk emergence. In the analysis of the principles of the project objectives identification and risk allocation, the paper set up a project management model which insurance companies involved in the whole process of the project management, and simply analyzed the roles of insurance company at last. (authors)

  17. Project Management Life Cycle Models to Improve Management in High-rise Construction

    Science.gov (United States)

    Burmistrov, Andrey; Siniavina, Maria; Iliashenko, Oksana

    2018-03-01

    The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models) based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  18. Project Management Life Cycle Models to Improve Management in High-rise Construction

    Directory of Open Access Journals (Sweden)

    Burmistrov Andrey

    2018-01-01

    Full Text Available The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  19. Cash flow forecasting model for nuclear power projects

    International Nuclear Information System (INIS)

    Liu Wei; Guo Jilin

    2002-01-01

    Cash flow forecasting is very important for owners and contractors of nuclear power projects to arrange the capital and to decrease the capital cost. The factors related to contractor cash flow forecasting are analyzed and a cash flow forecasting model is presented which is suitable for both contractors and owners. The model is efficiently solved using a cost-schedule data integration scheme described. A program is developed based on the model and verified with real project data. The result indicates that the model is efficient and effective

  20. REPNET: project scheduling and workflow optimization for Construction Projects

    Directory of Open Access Journals (Sweden)

    Marco Alvise Bragadin

    2013-10-01

    Full Text Available Project planning and control are core processes for construction management. In practice project planning is achieved by network - based techniques like Precedence Diagramming Method (PDM.Indeed many researchers and practitioners claims that networking techniques as such do not provide a suitable model for construction projects. Construction process modeling should incorporate for specific features of resource flows through project activities. So an improved resource scheduling method for construction is developed, called REPNET, based on a precedence network plotted on a resource–space chart and presented with a flow-line chart. The heuristics of REPNET are used to carry out resource timing while optimizing processes flows and resource usage. The method has been tested on a sample project.

  1. The Geoengineering Model Intercomparison Project (GeoMIP)

    KAUST Repository

    Kravitz, Ben

    2011-01-31

    To evaluate the effects of stratospheric geoengineering with sulphate aerosols, we propose standard forcing scenarios to be applied to multiple climate models to compare their results and determine the robustness of their responses. Thus far, different modeling groups have used different forcing scenarios for both global warming and geoengineering, complicating the comparison of results. We recommend four experiments to explore the extent to which geoengineering might offset climate change projected in some of the Climate Model Intercomparison Project 5 experiments. These experiments focus on stratospheric aerosols, but future experiments under this framework may focus on different means of geoengineering. © 2011 Royal Meteorological Society.

  2. International collaborative fire modeling project (ICFMP). Summary of benchmark

    International Nuclear Information System (INIS)

    Roewekamp, Marina; Klein-Hessling, Walter; Dreisbach, Jason; McGrattan, Kevin; Miles, Stewart; Plys, Martin; Riese, Olaf

    2008-09-01

    This document was developed in the frame of the 'International Collaborative Project to Evaluate Fire Models for Nuclear Power Plant Applications' (ICFMP). The objective of this collaborative project is to share the knowledge and resources of various organizations to evaluate and improve the state of the art of fire models for use in nuclear power plant fire safety, fire hazard analysis and fire risk assessment. The project is divided into two phases. The objective of the first phase is to evaluate the capabilities of current fire models for fire safety analysis in nuclear power plants. The second phase will extend the validation database of those models and implement beneficial improvements to the models that are identified in the first phase of ICFMP. In the first phase, more than 20 expert institutions from six countries were represented in the collaborative project. This Summary Report gives an overview on the results of the first phase of the international collaborative project. The main objective of the project was to evaluate the capability of fire models to analyze a variety of fire scenarios typical for nuclear power plants (NPP). The evaluation of the capability of fire models to analyze these scenarios was conducted through a series of in total five international Benchmark Exercises. Different types of models were used by the participating expert institutions from five countries. The technical information that will be useful for fire model users, developers and further experts is summarized in this document. More detailed information is provided in the corresponding technical reference documents for the ICFMP Benchmark Exercises No. 1 to 5. The objective of these exercises was not to compare the capabilities and strengths of specific models, address issues specific to a model, nor to recommend specific models over others. This document is not intended to provide guidance to users of fire models. Guidance on the use of fire models is currently being

  3. Solid Waste Projection Model: Database (Version 1.4)

    International Nuclear Information System (INIS)

    Blackburn, C.; Cillan, T.

    1993-09-01

    The Solid Waste Projection Model (SWPM) system is an analytical tool developed by Pacific Northwest Laboratory (PNL) for Westinghouse Hanford Company (WHC). The SWPM system provides a modeling and analysis environment that supports decisions in the process of evaluating various solid waste management alternatives. This document, one of a series describing the SWPM system, contains detailed information regarding the software and data structures utilized in developing the SWPM Version 1.4 Database. This document is intended for use by experienced database specialists and supports database maintenance, utility development, and database enhancement. Those interested in using the SWPM database should refer to the SWPM Database User's Guide. This document is available from the PNL Task M Project Manager (D. L. Stiles, 509-372-4358), the PNL Task L Project Manager (L. L. Armacost, 509-372-4304), the WHC Restoration Projects Section Manager (509-372-1443), or the WHC Waste Characterization Manager (509-372-1193)

  4. Consistency of climate change projections from multiple global and regional model intercomparison projects

    Science.gov (United States)

    Fernández, J.; Frías, M. D.; Cabos, W. D.; Cofiño, A. S.; Domínguez, M.; Fita, L.; Gaertner, M. A.; García-Díez, M.; Gutiérrez, J. M.; Jiménez-Guerrero, P.; Liguori, G.; Montávez, J. P.; Romera, R.; Sánchez, E.

    2018-03-01

    We present an unprecedented ensemble of 196 future climate projections arising from different global and regional model intercomparison projects (MIPs): CMIP3, CMIP5, ENSEMBLES, ESCENA, EURO- and Med-CORDEX. This multi-MIP ensemble includes all regional climate model (RCM) projections publicly available to date, along with their driving global climate models (GCMs). We illustrate consistent and conflicting messages using continental Spain and the Balearic Islands as target region. The study considers near future (2021-2050) changes and their dependence on several uncertainty sources sampled in the multi-MIP ensemble: GCM, future scenario, internal variability, RCM, and spatial resolution. This initial work focuses on mean seasonal precipitation and temperature changes. The results show that the potential GCM-RCM combinations have been explored very unevenly, with favoured GCMs and large ensembles of a few RCMs that do not respond to any ensemble design. Therefore, the grand-ensemble is weighted towards a few models. The selection of a balanced, credible sub-ensemble is challenged in this study by illustrating several conflicting responses between the RCM and its driving GCM and among different RCMs. Sub-ensembles from different initiatives are dominated by different uncertainty sources, being the driving GCM the main contributor to uncertainty in the grand-ensemble. For this analysis of the near future changes, the emission scenario does not lead to a strong uncertainty. Despite the extra computational effort, for mean seasonal changes, the increase in resolution does not lead to important changes.

  5. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  6. Process simulation and parametric modeling for strategic project management

    CERN Document Server

    Morales, Peter J

    2013-01-01

    Process Simulation and Parametric Modeling for Strategic Project Management will offer CIOs, CTOs and Software Development Managers, IT Graduate Students an introduction to a set of technologies that will help them understand how to better plan software development projects, manage risk and have better insight into the complexities of the software development process.A novel methodology will be introduced that allows a software development manager to better plan and access risks in the early planning of a project.  By providing a better model for early software development estimation and softw

  7. On Helical Projection and Its Application in Screw Modeling

    Directory of Open Access Journals (Sweden)

    Riliang Liu

    2014-04-01

    Full Text Available As helical surfaces, in their many and varied forms, are finding more and more applications in engineering, new approaches to their efficient design and manufacture are desired. To that end, the helical projection method that uses curvilinear projection lines to map a space object to a plane is examined in this paper, focusing on its mathematical model and characteristics in terms of graphical representation of helical objects. A number of interesting projective properties are identified in regard to straight lines, curves, and planes, and then the method is further investigated with respect to screws. The result shows that the helical projection of a cylindrical screw turns out to be a Jordan curve, which is determined by the screw's axial profile and number of flights. Based on the projection theory, a practical approach to the modeling of screws and helical surfaces is proposed and illustrated with examples, and its possible application in screw manufacturing is discussed.

  8. Modeling Manpower and Equipment Productivity in Tall Building Construction Projects

    Science.gov (United States)

    Mudumbai Krishnaswamy, Parthasarathy; Rajiah, Murugasan; Vasan, Ramya

    2017-12-01

    Tall building construction projects involve two critical resources of manpower and equipment. Their usage, however, widely varies due to several factors affecting their productivity. Currently, no systematic study for estimating and increasing their productivity is available. What is prevalent is the use of empirical data, experience of similar projects and assumptions. As tall building projects are here to stay and increase, to meet the emerging demands in ever shrinking urban spaces, it is imperative to explore ways and means of scientific productivity models for basic construction activities: concrete, reinforcement, formwork, block work and plastering for the input of specific resources in a mixed environment of manpower and equipment usage. Data pertaining to 72 tall building projects in India were collected and analyzed. Then, suitable productivity estimation models were developed using multiple linear regression analysis and validated using independent field data. It is hoped that the models developed in the study will be useful for quantity surveyors, cost engineers and project managers to estimate productivity of resources in tall building projects.

  9. City of Austin: Green habitat learning project. A green builder model home project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    The purpose of the Year 14 UCETF project was to design and construct a residential structure that could serve as a demonstration facility, training site, and testing and monitoring laboratory for issues related to the implementation of sustainable building practices and materials. The Model Home Project builds on the previous and existing efforts, partially funded by the UCETF, of the City of Austin Green Builder Program to incorporate sustainable building practices into mainstream building activities. The Green Builder Program uses the term {open_quotes}green{close_quotes} as a synonym for sustainability. In the research and analysis that was completed for our earlier reports in Years 12 and 13, we characterized specific elements that we associate with sustainability and, thus, green building. In general, we refer to a modified life cycle assessment to ascertain if {open_quotes}green{close_quotes} building options reflect similar positive cyclical patterns found in nature (i.e. recyclability, recycled content, renewable resources, etc.). We additionally consider economic, human health and synergistic ecological impacts associated with our building choices and characterize the best choices as {open_quotes}green.{close_quotes} Our ultimate goal is to identify and use those {open_quotes}green{close_quotes} materials and processes that provide well for us now and do not compromise similar benefits for future generations. The original partnership developed for this project shifted during the year from a project stressing advanced (many prototypical) {open_quotes}green{close_quotes} building materials and techniques in a research and demonstration context, to off-the-shelf but underutilized {open_quotes}green{close_quotes} materials in the practical social context of using {open_quotes}green{close_quotes} technologies for low income housing. That project, discussed in this report, is called the Green Habitat Learning Project.

  10. Myanmar Model Project

    International Nuclear Information System (INIS)

    Le Heron, John

    1998-01-01

    The National Radiation Laboratory was approached by the IAEA in 1997 to provide assistance to the government of Myanmar, as part of the Model Project, in setting up an appropriate regulatory framework for radiation protection. To this end John Le Heron spent 3 weeks in late 1997 based at the Atomic Energy Department of the Ministry of Science and Technology, Yangon, assessing the existing legal framework, assisting with the review and design of the legal framework for consistency with the Basic Safety Standards, and assisting in the preparation of a system of notification, authorisation and inspection of radiation practices. (author)

  11. Project Finance Model for Small Contractors in USA

    Directory of Open Access Journals (Sweden)

    Jawahar Nesan

    2012-11-01

    Full Text Available Construction projects do not require a large capital outlay but a large working capital to start up the project. Unfortunately, for small contractors there are very limited options available from the banks or other lending institutions to cover this large working capital requirement in the absence of sufficient collateral. The “Project Finance” method presented in this paper is recommended as the most effective method for small contractors in the United States. The problems of small and start up contractors in funding their projects have been little addressed in the literature. The current financing practices were observed through both the literature review and interviews with contractors and bankers in the western Michigan area and subsequently a system has been proposed which could help a small start-up company seeking higher growth. The growth rates that can be achieved using the project finance system in contrast to the traditional “line of credit” arrangements as illustrated in this paper show that the project finance model is beneficial.

  12. Improving Project Management Using Formal Models and Architectures

    Science.gov (United States)

    Kahn, Theodore; Sturken, Ian

    2011-01-01

    This talk discusses the advantages formal modeling and architecture brings to project management. These emerging technologies have both great potential and challenges for improving information available for decision-making. The presentation covers standards, tools and cultural issues needing consideration, and includes lessons learned from projects the presenters have worked on.

  13. Project 2010 Bible

    CERN Document Server

    Marmel, Elaine

    2010-01-01

    A comprehensive reference on the latest version of the leading enterprise project management software: Microsoft Project 2010. Microsoft Project allows users to manage business activities effectively by sharing project information, performing modeling and scenario analyses, standardizizing reporting processes, and more. This soup-to-nuts reference covers both the professional and standard versions of the latest iteration of Microsoft Project, as well as Project Server, so that you can efficiently manage your business projects. Veteran author Elaine Marmel begins with an overview of project man

  14. Streamline Your Project: A Lifecycle Model.

    Science.gov (United States)

    Viren, John

    2000-01-01

    Discusses one approach to project organization providing a baseline lifecycle model for multimedia/CBT development. This variation of the standard four-phase model of Analysis, Design, Development, and Implementation includes a Pre-Analysis phase, called Definition, and a Post-Implementation phase, known as Maintenance. Each phase is described.…

  15. Development of a funding, cost, and spending model for satellite projects

    Science.gov (United States)

    Johnson, Jesse P.

    1989-01-01

    The need for a predictive budget/funging model is obvious. The current models used by the Resource Analysis Office (RAO) are used to predict the total costs of satellite projects. An effort to extend the modeling capabilities from total budget analysis to total budget and budget outlays over time analysis was conducted. A statistical based and data driven methodology was used to derive and develop the model. Th budget data for the last 18 GSFC-sponsored satellite projects were analyzed and used to build a funding model which would describe the historical spending patterns. This raw data consisted of dollars spent in that specific year and their 1989 dollar equivalent. This data was converted to the standard format used by the RAO group and placed in a database. A simple statistical analysis was performed to calculate the gross statistics associated with project length and project cost ant the conditional statistics on project length and project cost. The modeling approach used is derived form the theory of embedded statistics which states that properly analyzed data will produce the underlying generating function. The process of funding large scale projects over extended periods of time is described by Life Cycle Cost Models (LCCM). The data was analyzed to find a model in the generic form of a LCCM. The model developed is based on a Weibull function whose parameters are found by both nonlinear optimization and nonlinear regression. In order to use this model it is necessary to transform the problem from a dollar/time space to a percentage of total budget/time space. This transformation is equivalent to moving to a probability space. By using the basic rules of probability, the validity of both the optimization and the regression steps are insured. This statistically significant model is then integrated and inverted. The resulting output represents a project schedule which relates the amount of money spent to the percentage of project completion.

  16. MODEL OF INTEGRATED VALUE OF PROJECTS IN THE FIELD OF ALTERNATIVE ENERGY

    Directory of Open Access Journals (Sweden)

    Наталія Ігорівна БОРИСОВА

    2015-05-01

    Full Text Available Development of alternative energy sources requires the implementation of complex problems, the solution of which is necessary to apply the project approach. The uniqueness of alternative energy projects (AEP necessitates individual approach to evaluating the effectiveness of each. The paper contains the results of the project management features's analysis in the field of alternative energy, determining the values and developing of the value management integrated conceptual model of AEP. In assessing the effectiveness of AEP considered the socio-economic and commercial aspects. Value management integrated conceptual model of AEP was obtained by combining the classical model of the project management goals with the project values model "Five "E" and two "A". The classical model of the project management goals have been complemented with risk parameters.

  17. A CONCEPTUAL MODEL FOR IMPROVED PROJECT SELECTION AND PRIORITISATION

    Directory of Open Access Journals (Sweden)

    P. J. Viljoen

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: Project portfolio management processes are often designed and operated as a series of stages (or project phases and gates. However, the flow of such a process is often slow, characterised by queues waiting for a gate decision and by repeated work from previous stages waiting for additional information or for re-processing. In this paper the authors propose a conceptual model that applies supply chain and constraint management principles to the project portfolio management process. An advantage of the proposed model is that it provides the ability to select and prioritise projects without undue changes to project schedules. This should result in faster flow through the system.

    AFRIKAANSE OPSOMMING: Prosesse om portefeuljes van projekte te bestuur word normaalweg ontwerp en bedryf as ’n reeks fases en hekke. Die vloei deur so ’n proses is dikwels stadig en word gekenmerk deur toue wat wag vir besluite by die hekke en ook deur herwerk van vorige fases wat wag vir verdere inligting of vir herprosessering. In hierdie artikel word ‘n konseptuele model voorgestel. Die model berus op die beginsels van voorsieningskettings sowel as van beperkingsbestuur, en bied die voordeel dat projekte geselekteer en geprioritiseer kan word sonder onnodige veranderinge aan projekskedules. Dit behoort te lei tot versnelde vloei deur die stelsel.

  18. A Systematic Approach to Modelling Change Processes in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ibrahim Motawa

    2012-11-01

    Full Text Available Modelling change processes within construction projects isessential to implement changes efficiently. Incomplete informationon the project variables at the early stages of projects leads toinadequate knowledge of future states and imprecision arisingfrom ambiguity in project parameters. This lack of knowledge isconsidered among the main source of changes in construction.Change identification and evaluation, in addition to predictingits impacts on project parameters, can help in minimising thedisruptive effects of changes. This paper presents a systematicapproach to modelling change process within construction projectsthat helps improve change identification and evaluation. Theapproach represents the key decisions required to implementchanges. The requirements of an effective change processare presented first. The variables defined for efficient changeassessment and diagnosis are then presented. Assessmentof construction changes requires an analysis for the projectcharacteristics that lead to change and also analysis of therelationship between the change causes and effects. The paperconcludes that, at the early stages of a project, projects with a highlikelihood of change occurrence should have a control mechanismover the project characteristics that have high influence on theproject. It also concludes, for the relationship between changecauses and effects, the multiple causes of change should bemodelled in a way to enable evaluating the change effects moreaccurately. The proposed approach is the framework for tacklingsuch conclusions and can be used for evaluating change casesdepending on the available information at the early stages ofconstruction projects.

  19. Project M: Scale Model of Lunar Landing Site of Apollo 17

    Science.gov (United States)

    O'Brien, Hollie; Crain, Timothy P.

    2010-01-01

    The basis of the project was creating a scale model representation of the Apollo 17 lunar landing site. Vital components included surface slope characteristics, crater sizes and locations, prominent rocks, and lighting conditions. The model was made for Project M support when evaluating approach and terminal descent as well as when planning surface operations with respect to the terrain. The project had five main mi lestones during the length of the project. The first was examining the best method to use to re-create the Apollo 17 landing site and then reviewing research fmdings with Dr. Tim Crain and EO staff which occurred on June 25, 2010 at a meeting. The second step was formulating a construction plan, budget, and schedule and then presenting the plan for authority to proceed which occurred on July 6,2010. The third part was building a prototype to test materials and building processes which were completed by July 13, 2010. Next was assembling the landing site model and presenting a mid-term construction status report on July 29, 2010. The fifth and final milestone was demonstrating the model and presenting an exit pitch which happened on August 4, 2010. The project was very technical: it needed a lot of research about moon topography, lighting conditions and angles of the sun on the moon, Apollo 17, and Autonomous Landing and Hazard Avoidance Technology (ALHAT), before starting the actual building process. This required using Spreadsheets, searching internet sources and conducting personal meetings with project representatives. This information assisted the interns in deciding the scale of the model with respect to cracks, craters and rocks and their relative sizes as the objects mentioned could interfere with any of the Lunar Landers: Apollo, Project M and future Landers. The project concluded with the completion of a three dimensional scale model of the Apollo 17 Lunar landing site. This model assists Project M members because they can now visualize

  20. ORGANIZATIONAL PROJECT MANAGEMENT MATURITY

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2017-11-01

    Full Text Available The present article is aimed at developing a set of recommendations for achieving a higher level of organizational project maturity at a given enterprise. Methodology. For the purposes of the current research, the available information sources on the components of project management system are analysed; the essence of “organizational maturity” and the existing models of organizational maturity are studied. The method of systemic and structural analysis, as well as the method of logical generalization, are employed in order to study the existing models of organizational maturity, to describe levels of organizational maturity, and finally to develop a set of methodological recommendations for achieving a higher level of organizational project maturity at a given enterprise. The results of the research showed that the core elements of project management system are methodological, organizational, programtechnical, and motivational components. Project management encompasses a wide range of issues connected with organizational structure, project team, communication management, project participants, etc. However, the fundamental basis for developing project management concept within a given enterprise starts with defining its level of organizational maturity. The present paper describes various models of organizational maturity (staged, continuous, petal-shaped and their common types (H. Кеrzner Organizational Maturity Model, Berkeley PM Maturity Model, Organizational Project Management Maturity Model, Portfolio, Program & Project Management Maturity Model. The analysis of available theoretic works showed that the notion “organizational project maturity” refers to the capability of an enterprise to select projects and manage them with the intention of achieving its strategic goals in the most effective way. Importantly, the level of maturity can be improved by means of formalizing the acquired knowledge, regulating project-related activities

  1. Solid Waste Projection Model: Model user's guide

    International Nuclear Information System (INIS)

    Stiles, D.L.; Crow, V.L.

    1990-08-01

    The Solid Waste Projection Model (SWPM) system is an analytical tool developed by Pacific Northwest Laboratory (PNL) for Westinghouse Hanford company (WHC) specifically to address solid waste management issues at the Hanford Central Waste Complex (HCWC). This document, one of six documents supporting the SWPM system, contains a description of the system and instructions for preparing to use SWPM and operating Version 1 of the model. 4 figs., 1 tab

  2. Quark shell model using projection operators

    International Nuclear Information System (INIS)

    Ullah, N.

    1988-01-01

    Using the projection operators in the quark shell model, the wave functions for proton are calculated and expressions for calculating the wave function of neutron and also magnetic moment of proton and neutron are derived. (M.G.B.)

  3. NASA's Aviation Safety and Modeling Project

    Science.gov (United States)

    Chidester, Thomas R.; Statler, Irving C.

    2006-01-01

    The Aviation Safety Monitoring and Modeling (ASMM) Project of NASA's Aviation Safety program is cultivating sources of data and developing automated computer hardware and software to facilitate efficient, comprehensive, and accurate analyses of the data collected from large, heterogeneous databases throughout the national aviation system. The ASMM addresses the need to provide means for increasing safety by enabling the identification and correcting of predisposing conditions that could lead to accidents or to incidents that pose aviation risks. A major component of the ASMM Project is the Aviation Performance Measuring System (APMS), which is developing the next generation of software tools for analyzing and interpreting flight data.

  4. Musculoskeletal Modelling and the Physiome Project

    NARCIS (Netherlands)

    Fernandez, Justin; Zhang, Ju; Shim, Vickie; Munro, Jacob T.; Sartori, Massimo; Besier, Thor; Lloyd, David G.; Nickerson, David P.; Hunter, Peter; Pivonka, Peter

    2018-01-01

    This chapter presents developments as part of the International Union of Physiological Sciences (IUPS) Physiome Project. Models are multiscale, multispatial and multiphysics, hence, suitable numerical tools and platforms have been developed to address these challenges for the musculoskeletal system.

  5. HB-Line Special Nuclear Material Campaigns: Model-Based Project Management

    International Nuclear Information System (INIS)

    CHANG, ROBERT

    2004-01-01

    This study is to show how a model was used to enable management to better estimate production capabilities to ensure contract milestones/commitments are met, to cope with fast changing project baselines and project missions, to ensure the project will meet the negotiated throughput, and to eliminate unnecessary but costly design changes

  6. METHODS OF SELECTING THE EFFECTIVE MODELS OF BUILDINGS REPROFILING PROJECTS

    Directory of Open Access Journals (Sweden)

    Александр Иванович МЕНЕЙЛЮК

    2016-02-01

    Full Text Available The article highlights the important task of project management in reprofiling of buildings. It is expedient to pay attention to selecting effective engineering solutions to reduce the duration and cost reduction at the project management in the construction industry. This article presents a methodology for the selection of efficient organizational and technical solutions for the reconstruction of buildings reprofiling. The method is based on a compilation of project variants in the program Microsoft Project and experimental statistical analysis using the program COMPEX. The introduction of this technique in the realigning of buildings allows choosing efficient models of projects, depending on the given constraints. Also, this technique can be used for various construction projects.

  7. The Chancellor's Model School Project (CMSP)

    Science.gov (United States)

    Lopez, Gil

    1999-01-01

    What does it take to create and implement a 7th to 8th grade middle school program where the great majority of students achieve at high academic levels regardless of their previous elementary school backgrounds? This was the major question that guided the research and development of a 7-year long project effort entitled the Chancellor's Model School Project (CMSP) from September 1991 to August 1998. The CMSP effort conducted largely in two New York City public schools was aimed at creating and testing a prototype 7th and 8th grade model program that was organized and test-implemented in two distinct project phases: Phase I of the CMSP effort was conducted from 1991 to 1995 as a 7th to 8th grade extension of an existing K-6 elementary school, and Phase II was conducted from 1995 to 1998 as a 7th to 8th grade middle school program that became an integral part of a newly established 7-12th grade high school. In Phase I, the CMSP demonstrated that with a highly structured curriculum coupled with strong academic support and increased learning time, students participating in the CMSP were able to develop a strong foundation for rigorous high school coursework within the space of 2 years (at the 7th and 8th grades). Mathematics and Reading test score data during Phase I of the project, clearly indicated that significant academic gains were obtained by almost all students -- at both the high and low ends of the spectrum -- regardless of their previous academic performance in the K-6 elementary school experience. The CMSP effort expanded in Phase II to include a fully operating 7-12 high school model. Achievement gains at the 7th and 8th grade levels in Phase II were tempered by the fact that incoming 7th grade students' academic background at the CMSP High School was significantly lower than students participating in Phase 1. Student performance in Phase II was also affected by the broadening of the CMSP effort from a 7-8th grade program to a fully functioning 7-12 high

  8. Something of value Governance of Projects in the Project-Based Organisation

    DEFF Research Database (Denmark)

    Riis, Eva

    2013-01-01

    The paper presents a conceptual framework for studying Governance of Projects and issues of value in the project-based organisation. Attempts at exploring and conceptualising the issues in the current literature are reviewed. Issues pertinent to gaining value by Governance of Projects have mainly...... for a better understanding of Governance of Projects and value contribution. The findings presented here form the conceptual foundation for subsequent empirical studies of value by Governance of Projects....... been explored from the perspective of economic theory. Models found in the literature are not typically concerned with value for the implementing organisation as a whole; their scope is limited to the time just after project completion. No valid, empirically-based models of value creation by Governance...

  9. INFORMATION MODELING OF LIFE CYCLE OF HIGH-RISE CONSTRUCTION PROJECTS

    Directory of Open Access Journals (Sweden)

    Gusakova Elena Aleksandrovna

    2018-02-01

    Full Text Available To date, many years’ experience in the construction and operation of high-rise buildings has been accumulated. Its analysis reveals not only the engineering and organizational-technological specifics of such projects, but also systemic gaps in the field of management. In the implementation of large-scale and unique projects for high-rise buildings, the problems and tasks of improving approaches to managing the full life cycle of projects and methods, which will improve their competitiveness, become topical. The systems being used have largely exhausted their resource efficiency, which is associated with automation of traditional “inherited” processes and management structures, as well as development of IT-systems focused on digitalization of the activities of construction company, rather than the project. To solve these problems, it is proposed to carry out: reengineering of the schemes of information interaction between the project’s participants; formation of integrated digital environment for the life cycle of the project; development of systems for integrating data management and project management. Subject: problems, approaches and methods of digitalization of project’s life cycle management in relation to the specifics and features of high-rise buildings. Research objectives: substantiation of the most perspective approaches and methods of information modeling of high-rise construction as the basis for managing the full life cycle of the given project. Materials and methods: the experience of digitalization of design, construction, operation and development of high-rise buildings, presented in specialized literature, is analyzed. The methods for integrating information models of various stages of project’s life cycle and for information interaction of project’s participants are considered. Results: the concept of forming a single digital environment for the project is proposed, taking into account the features of the life

  10. Adoption of Building Information Modelling in project planning risk management

    Science.gov (United States)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  11. The Study on Stage Financing Model of IT Project Investment

    Directory of Open Access Journals (Sweden)

    Si-hua Chen

    2014-01-01

    Full Text Available Stage financing is the basic operation of venture capital investment. In investment, usually venture capitalists use different strategies to obtain the maximum returns. Due to its advantages to reduce the information asymmetry and agency cost, stage financing is widely used by venture capitalists. Although considerable attentions are devoted to stage financing, very little is known about the risk aversion strategies of IT projects. This paper mainly addresses the problem of risk aversion of venture capital investment in IT projects. Based on the analysis of characteristics of venture capital investment of IT projects, this paper introduces a real option pricing model to measure the value brought by the stage financing strategy and design a risk aversion model for IT projects. Because real option pricing method regards investment activity as contingent decision, it helps to make judgment on the management flexibility of IT projects and then make a more reasonable evaluation about the IT programs. Lastly by being applied to a real case, it further illustrates the effectiveness and feasibility of the model.

  12. The Study on Stage Financing Model of IT Project Investment

    Science.gov (United States)

    Xu, Sheng-hua; Xiong, Neal N.

    2014-01-01

    Stage financing is the basic operation of venture capital investment. In investment, usually venture capitalists use different strategies to obtain the maximum returns. Due to its advantages to reduce the information asymmetry and agency cost, stage financing is widely used by venture capitalists. Although considerable attentions are devoted to stage financing, very little is known about the risk aversion strategies of IT projects. This paper mainly addresses the problem of risk aversion of venture capital investment in IT projects. Based on the analysis of characteristics of venture capital investment of IT projects, this paper introduces a real option pricing model to measure the value brought by the stage financing strategy and design a risk aversion model for IT projects. Because real option pricing method regards investment activity as contingent decision, it helps to make judgment on the management flexibility of IT projects and then make a more reasonable evaluation about the IT programs. Lastly by being applied to a real case, it further illustrates the effectiveness and feasibility of the model. PMID:25147845

  13. The study on stage financing model of IT project investment.

    Science.gov (United States)

    Chen, Si-hua; Xu, Sheng-hua; Lee, Changhoon; Xiong, Neal N; He, Wei

    2014-01-01

    Stage financing is the basic operation of venture capital investment. In investment, usually venture capitalists use different strategies to obtain the maximum returns. Due to its advantages to reduce the information asymmetry and agency cost, stage financing is widely used by venture capitalists. Although considerable attentions are devoted to stage financing, very little is known about the risk aversion strategies of IT projects. This paper mainly addresses the problem of risk aversion of venture capital investment in IT projects. Based on the analysis of characteristics of venture capital investment of IT projects, this paper introduces a real option pricing model to measure the value brought by the stage financing strategy and design a risk aversion model for IT projects. Because real option pricing method regards investment activity as contingent decision, it helps to make judgment on the management flexibility of IT projects and then make a more reasonable evaluation about the IT programs. Lastly by being applied to a real case, it further illustrates the effectiveness and feasibility of the model.

  14. Flat-plate solar array project. Volume 8: Project analysis and integration

    Science.gov (United States)

    Mcguire, P.; Henry, P.

    1986-01-01

    Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.

  15. National Automated Highway System Consortium: Modeling Stakeholder Preferences Project

    OpenAIRE

    Lathrop, John; Chen, Kan

    1997-01-01

    This document is the final report of the Modeling Stakeholder Preferences Project. The results of the project consist of three results: 1) evaluation framework; 2) focus group non-quantitative findings/ recommendations; and, 3) performance/impact measures, their endpoints, rankings and weights, for each stakeholder group.

  16. THE MODELLING OF ORGANIZATIONAL STRUCTURES OF MANAGEMENT BY REALIZING INVESTMENT CONSTRUCTION PROJECTS

    Directory of Open Access Journals (Sweden)

    Олег Александрович КУЧМА

    2016-03-01

    Full Text Available The authors consider the modeling of organizational structures by virtue of interaction between the basic participants by realizing of investment construction projects. This process is directed at the complex analysis of a problem of quality management by creating of building goods taking into account modern project management tendencies. The topicality of problem is obvious as by realizing of investment construction projects there is a liberal share of uncompleted projects, and in the completed projects actual values considerably exceed budgeted capital expenditures. The introduced model allows managing the project per quality system in all phases of the investment construction project‘s life cycle. It promotes refinement of building goods, improves the rate of successfully completed projects with actual values near budgeted.

  17. Project-Management Tools for Libraries: A Planning and Implementation Model Using Microsoft Project 2000

    OpenAIRE

    Ying Zhang; Corinne Bishop

    2005-01-01

    This paper discusses how Microsoft Project 2000 was utilized at the University of Central Florida Libraries to manage an e-reference implementation project. As libraries today adopt more information technologies, efficiently managing projects can be challenging. The authors’ experience in the implementation of QuestionPoint e-reference software in October 2003 is described. Their conclusion illustrates that project-management tools, such as Microsoft Project 2000, offer practical workflow-man...

  18. Do telemonitoring projects of heart failure fit the Chronic Care Model?

    Science.gov (United States)

    Willemse, Evi; Adriaenssens, Jef; Dilles, Tinne; Remmen, Roy

    2014-07-01

    This study describes the characteristics of extramural and transmural telemonitoring projects on chronic heart failure in Belgium. It describes to what extent these telemonitoring projects coincide with the Chronic Care Model of Wagner. The Chronic Care Model describes essential components for high-quality health care. Telemonitoring can be used to optimise home care for chronic heart failure. It provides a potential prospective to change the current care organisation. This qualitative study describes seven non-invasive home-care telemonitoring projects in patients with heart failure in Belgium. A qualitative design, including interviews and literature review, was used to describe the correspondence of these home-care telemonitoring projects with the dimensions of the Chronic Care Model. The projects were situated in primary and secondary health care. Their primary goal was to reduce the number of readmissions for chronic heart failure. None of these projects succeeded in a final implementation of telemonitoring in home care after the pilot phase. Not all the projects were initiated to accomplish all of the dimensions of the Chronic Care Model. A central role for the patient was sparse. Limited financial resources hampered continuation after the pilot phase. Cooperation and coordination in telemonitoring appears to be major barriers but are, within primary care as well as between the lines of care, important links in follow-up. This discrepancy can be prohibitive for deployment of good chronic care. Chronic Care Model is recommended as basis for future.

  19. A Fuzzy Comprehensive Evaluation Model for Sustainability Risk Evaluation of PPP Projects

    Directory of Open Access Journals (Sweden)

    Libiao Bai

    2017-10-01

    Full Text Available Evaluating the sustainability risk level of public–private partnership (PPP projects can reduce project risk incidents and achieve the sustainable development of the organization. However, the existing studies about PPP projects risk management mainly focus on exploring the impact of financial and revenue risks but ignore the sustainability risks, causing the concept of “sustainability” to be missing while evaluating the risk level of PPP projects. To evaluate the sustainability risk level and achieve the most important objective of providing a reference for the public and private sectors when making decisions on PPP project management, this paper constructs a factor system of sustainability risk of PPP projects based on an extensive literature review and develops a mathematical model based on the methods of fuzzy comprehensive evaluation model (FCEM and failure mode, effects and criticality analysis (FMECA for evaluating the sustainability risk level of PPP projects. In addition, this paper conducts computational experiment based on a questionnaire survey to verify the effectiveness and feasibility of this proposed model. The results suggest that this model is reasonable for evaluating the sustainability risk level of PPP projects. To our knowledge, this paper is the first study to evaluate the sustainability risk of PPP projects, which would not only enrich the theories of project risk management, but also serve as a reference for the public and private sectors for the sustainable planning and development. Keywords: sustainability risk eva

  20. A New Bi-Directional Projection Model Based on Pythagorean Uncertain Linguistic Variable

    OpenAIRE

    Huidong Wang; Shifan He; Xiaohong Pan

    2018-01-01

    To solve the multi-attribute decision making (MADM) problems with Pythagorean uncertain linguistic variable, an extended bi-directional projection method is proposed. First, we utilize the linguistic scale function to convert uncertain linguistic variable and provide a new projection model, subsequently. Then, to depict the bi-directional projection method, the formative vectors of alternatives and ideal alternatives are defined. Furthermore, a comparative analysis with projection model is co...

  1. PROJECT - RESOURCE MANAGEMENT OF INNOVATIONS IN EDUCATION: ANTHROPOLOGICAL PROJECTION

    Directory of Open Access Journals (Sweden)

    Galina Aleksandrovna Ignat’eva

    2015-08-01

    Full Text Available The purpose of the research was to denote a way to solve the problem of education mana-gement ΄s insufficient efficiency considered from the point of view of education opportunities to influence on the formation of mechanisms for sustainable development of society as a whole and its educational component. The concept «project-resource management of innovation in education» regarded on the basis of the anthropological project-transforming paradigm. Conceptually-categorical context presented by conceptual cluster composed of coordinated concepts «project», «resource», «educational reality», «organizational-resource potential», «project commonality». In the theoretical part of the study on the basis of analysis of the normative and exploratory approaches to educational innovations organization and management it was established the search approach ΄s leading role in the methodological substantiation of project-resource management. The study have indicated that in the presence of variable models of innovation management in education, corresponding to various predictive models of continuing education post-industrial society, project-resource management is an universal mechanism for the transition from separate innovation΄s precedents to the an authentic reality of innovative education. In the technological part of the study the main concern was to submit the project-resource management by the management goal’s system, each of which includes the specific management actions, projected results and the organizational forms. The project-resource management ΄s professional – activity context of the study showed evolution of managerial positions: an effective performer – an effective leader – strategist, implemented during the transition from directly directive management to the project management and further to the project-resource management. Based on the findings identified the key factors of initiatively-problem projects

  2. Project Investment and Project Financing: A study on Business Case and Financing Models

    OpenAIRE

    Wang, Simiao

    2012-01-01

    Uncertainty is a very significant factor that must be taken into consideration in project front-end phase management. By taking into uncertainty, the planners can to a great extent make sure that the business case could be accurate between specific intervals, hence business case can be based on to make decision. In a highly uncertain environment; the project sponsors should prefer other means to finance the project rather than using debt. Risk management is extremely important in project fina...

  3. SESAME as a Model Project for Other Regions

    Science.gov (United States)

    Winick, Herman

    2013-03-01

    UNESCO became the umbrella organization for SESAME at its Executive Board 164th session, May 2002. The following comments about SESAME were made by this board: ``a quintessential UNESCO project combining capacity building with vital peace-building through science'' and ``a model project for other regions.'' Now that SESAME is well underway, other regions (e.g.; Africa and Central Asia) should be made aware of this progress, and they should be welcomed to join SESAME as a first step in developing similar projects in their region. Students and scientists from other regions should be encouraged to attend SESAME Users' meeting, schools, workshops, etc. where they can learn about synchrotron radiation sources, beamlines, and science. They should be invited to join SESAME scientists in designing and commissioning accelerators and beamlines, gaining relevant experience for their own projects and helping SESAME in the process. Work supported by DOE Office of Basic Energy Sciences

  4. Management of information in development projects – a proposed integrated model

    Directory of Open Access Journals (Sweden)

    C. Bester

    2008-11-01

    Full Text Available The first section of the article focuses on the need for development in Africa and the specific challenges of development operations. It describes the need for a holistic and integrated information management model as part of the project management body of knowledge aimed at managing the information flow between communities and development project teams. It is argued that information, and access to information, is crucial in development projects and can therefore be seen as a critical success factor in any development project. In the second section of the article, the three information areas of the holistic and integrated information management model are described. In the section thereafter we suggest roles and actions for information managers to facilitate information processes integral to the model. These processes seek to create a developing information community that aligns itself with the development project, and supports and sustains it.

  5. Study on the maturity model of nuclear power project management in China

    International Nuclear Information System (INIS)

    Chen Changbing; Li Huiqiang; Zheng Yanguo

    2009-01-01

    Based on the general project management maturity model, this paper discussed the establishment of nuclear power engineering project management maturity model in China, and proposed a basic framework in order to provide a way for improving and evaluating the ability of nuclear power project management in China. (authors)

  6. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Log in or Register to get access to full text downloads. ... (decision-making, problem-solving, listening, verbal competency, motivation, persuasion, ... Keywords: Communication skills and leadership model, construction project management, ...

  7. Developing integrated parametric planning models for budgeting and managing complex projects

    Science.gov (United States)

    Etnyre, Vance A.; Black, Ken U.

    1988-01-01

    The applicability of integrated parametric models for the budgeting and management of complex projects is investigated. Methods for building a very flexible, interactive prototype for a project planning system, and software resources available for this purpose, are discussed and evaluated. The prototype is required to be sensitive to changing objectives, changing target dates, changing costs relationships, and changing budget constraints. To achieve the integration of costs and project and task durations, parametric cost functions are defined by a process of trapezoidal segmentation, where the total cost for the project is the sum of the various project cost segments, and each project cost segment is the integral of a linearly segmented cost loading function over a specific interval. The cost can thus be expressed algebraically. The prototype was designed using Lotus-123 as the primary software tool. This prototype implements a methodology for interactive project scheduling that provides a model of a system that meets most of the goals for the first phase of the study and some of the goals for the second phase.

  8. Space-time least-squares Petrov-Galerkin projection in nonlinear model reduction.

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Youngsoo [Sandia National Laboratories (SNL-CA), Livermore, CA (United States). Extreme-scale Data Science and Analytics Dept.; Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Carlberg, Kevin Thomas [Sandia National Laboratories (SNL-CA), Livermore, CA (United States). Extreme-scale Data Science and Analytics Dept.

    2017-09-01

    Our work proposes a space-time least-squares Petrov-Galerkin (ST-LSPG) projection method for model reduction of nonlinear dynamical systems. In contrast to typical nonlinear model-reduction methods that first apply Petrov-Galerkin projection in the spatial dimension and subsequently apply time integration to numerically resolve the resulting low-dimensional dynamical system, the proposed method applies projection in space and time simultaneously. To accomplish this, the method first introduces a low-dimensional space-time trial subspace, which can be obtained by computing tensor decompositions of state-snapshot data. The method then computes discrete-optimal approximations in this space-time trial subspace by minimizing the residual arising after time discretization over all space and time in a weighted ℓ2-norm. This norm can be de ned to enable complexity reduction (i.e., hyper-reduction) in time, which leads to space-time collocation and space-time GNAT variants of the ST-LSPG method. Advantages of the approach relative to typical spatial-projection-based nonlinear model reduction methods such as Galerkin projection and least-squares Petrov-Galerkin projection include: (1) a reduction of both the spatial and temporal dimensions of the dynamical system, (2) the removal of spurious temporal modes (e.g., unstable growth) from the state space, and (3) error bounds that exhibit slower growth in time. Numerical examples performed on model problems in fluid dynamics demonstrate the ability of the method to generate orders-of-magnitude computational savings relative to spatial-projection-based reduced-order models without sacrificing accuracy.

  9. A New Bi-Directional Projection Model Based on Pythagorean Uncertain Linguistic Variable

    Directory of Open Access Journals (Sweden)

    Huidong Wang

    2018-04-01

    Full Text Available To solve the multi-attribute decision making (MADM problems with Pythagorean uncertain linguistic variable, an extended bi-directional projection method is proposed. First, we utilize the linguistic scale function to convert uncertain linguistic variable and provide a new projection model, subsequently. Then, to depict the bi-directional projection method, the formative vectors of alternatives and ideal alternatives are defined. Furthermore, a comparative analysis with projection model is conducted to show the superiority of bi-directional projection method. Finally, an example of graduate’s job option is given to demonstrate the effectiveness and feasibility of the proposed method.

  10. THE DEVELOPMENT OF A MODEL INITIATION OF PROJECT IN A FORM OF MARKOV CHAIN

    Directory of Open Access Journals (Sweden)

    Катерина Вікторівна КОЛЕСНІКОВА

    2017-03-01

    Full Text Available The model of the initiation of projects which reproduces a fragment of the general scheme of interaction between the main entities in the project initiation phase is created. Determined that the project initiation through communication links between the four main entities: projects team, environment, the project itself and the customer. The result of the initiation of projects in the emerging communications referred to objects in the design phase through consistency requirements of stakeholders and the adoption of the basic concepts of projects, goal-projects, project planning, evaluation requirements of specialization and competence required for the formation of the project team. This Markov chain is part of the control circuit that includes elements such as the temporary organizational structure of the project design, project team, customer, and environment project. It is shown that the Markov model of interaction between project participants in their initiation phase, taking into account the role of a key player in the project ‑ the customer can determine changes of state and generate recommendations for initiating projects. Results of the study can serve as a basis for creating models of control objects that contain its organizational structure and reflect the parametric properties of the system to obtain information needed for decision making to initiate projects

  11. Projective limits of state spaces III. Toy-models

    Science.gov (United States)

    Lanéry, Suzanne; Thiemann, Thomas

    2018-01-01

    In this series of papers, we investigate the projective framework initiated by Kijowski (1977) and Okołów (2009, 2014, 2013) [1,2], which describes the states of a quantum theory as projective families of density matrices. A short reading guide to the series can be found in Lanéry (2016). A strategy to implement the dynamics in this formalism was presented in our first paper Lanéry and Thiemann (2017) (see also Lanéry, 2016, section 4), which we now test in two simple toy-models. The first one is a very basic linear model, meant as an illustration of the general procedure, and we will only discuss it at the classical level. In the second one, we reformulate the Schrödinger equation, treated as a classical field theory, within this projective framework, and proceed to its (non-relativistic) second quantization. We are then able to reproduce the physical content of the usual Fock quantization.

  12. Lectures on nonlinear sigma-models in projective superspace

    Energy Technology Data Exchange (ETDEWEB)

    Kuzenko, Sergei M, E-mail: kuzenko@cyllene.uwa.edu.a [School of Physics M013, University of Western Australia, 35 Stirling Highway, Crawley WA 6009 (Australia)

    2010-11-05

    N= 2 supersymmetry in four spacetime dimensions is intimately related to hyperkaehler and quaternionic Kaehler geometries. On one hand, the target spaces for rigid supersymmetric sigma-models are necessarily hyperkaehler manifolds. On the other hand, when coupled to N= 2 supergravity, the sigma-model target spaces must be quaternionic Kaehler. It is known that such manifolds of restricted holonomy are difficult to generate explicitly. Projective superspace is a field-theoretic approach to construct general N= 2 supersymmetric nonlinear sigma-models, and hence to generate new hyperkaehler and quaternionic Kaehler metrics. Intended for a mixed audience consisting of both physicists and mathematicians, these lectures provide a pedagogical introduction to the projective-superspace approach. (topical review)

  13. Lectures on nonlinear sigma-models in projective superspace

    International Nuclear Information System (INIS)

    Kuzenko, Sergei M

    2010-01-01

    N= 2 supersymmetry in four spacetime dimensions is intimately related to hyperkaehler and quaternionic Kaehler geometries. On one hand, the target spaces for rigid supersymmetric sigma-models are necessarily hyperkaehler manifolds. On the other hand, when coupled to N= 2 supergravity, the sigma-model target spaces must be quaternionic Kaehler. It is known that such manifolds of restricted holonomy are difficult to generate explicitly. Projective superspace is a field-theoretic approach to construct general N= 2 supersymmetric nonlinear sigma-models, and hence to generate new hyperkaehler and quaternionic Kaehler metrics. Intended for a mixed audience consisting of both physicists and mathematicians, these lectures provide a pedagogical introduction to the projective-superspace approach. (topical review)

  14. MODEL RANCANGAN SISTEM INFORMASI PROJECT MONITORING

    Directory of Open Access Journals (Sweden)

    Yanti Yanti

    2009-10-01

    Full Text Available Economic development makes the property industry growing very rapidly. The property development is supported by the development of contractor’s company that conducts property development. Inside the contracting company doing business can not perform their own procurement because of the many items that must be provided. For the purposes of the construction company entered into an agreement with the subcontractor as vendor conduct procurement in accordance with the needs of contracting companies. To simplify the procurement process, generally conducted by a process called a tender / auction. This is done by contracting companies to get quality and price in accordance with the desired budget. The company’s commitment subcontractors as the procurement of goods to be one key to successful contracting company doing business development process. Therefore, the subcontractor companies are required to have a good commitment. Therefore we need a project monitoring system that can monitor business processes running on those sub contractor company. The purpose of this research is to design a project monitoring information system in accordance with company requirements to operational activities more effective and efficient company.Keywords: project monitoring, design model, subcontractor

  15. A Team Building Model for Software Engineering Courses Term Projects

    Science.gov (United States)

    Sahin, Yasar Guneri

    2011-01-01

    This paper proposes a new model for team building, which enables teachers to build coherent teams rapidly and fairly for the term projects of software engineering courses. Moreover, the model can also be used to build teams for any type of project, if the team member candidates are students, or if they are inexperienced on a certain subject. The…

  16. Number projection method

    International Nuclear Information System (INIS)

    Kaneko, K.

    1987-01-01

    A relationship between the number projection and the shell model methods is investigated in the case of a single-j shell. We can find a one-to-one correspondence between the number projected and the shell model states

  17. Logistics of Mathematical Modeling-Focused Projects

    Science.gov (United States)

    Harwood, R. Corban

    2018-01-01

    This article addresses the logistics of implementing projects in an undergraduate mathematics class and is intended both for new instructors and for instructors who have had negative experiences implementing projects in the past. Project implementation is given for both lower- and upper-division mathematics courses with an emphasis on mathematical…

  18. Partitioning uncertainty in streamflow projections under nonstationary model conditions

    Science.gov (United States)

    Chawla, Ila; Mujumdar, P. P.

    2018-02-01

    Assessing the impacts of Land Use (LU) and climate change on future streamflow projections is necessary for efficient management of water resources. However, model projections are burdened with significant uncertainty arising from various sources. Most of the previous studies have considered climate models and scenarios as major sources of uncertainty, but uncertainties introduced by land use change and hydrologic model assumptions are rarely investigated. In this paper an attempt is made to segregate the contribution from (i) general circulation models (GCMs), (ii) emission scenarios, (iii) land use scenarios, (iv) stationarity assumption of the hydrologic model, and (v) internal variability of the processes, to overall uncertainty in streamflow projections using analysis of variance (ANOVA) approach. Generally, most of the impact assessment studies are carried out with unchanging hydrologic model parameters in future. It is, however, necessary to address the nonstationarity in model parameters with changing land use and climate. In this paper, a regression based methodology is presented to obtain the hydrologic model parameters with changing land use and climate scenarios in future. The Upper Ganga Basin (UGB) in India is used as a case study to demonstrate the methodology. The semi-distributed Variable Infiltration Capacity (VIC) model is set-up over the basin, under nonstationary conditions. Results indicate that model parameters vary with time, thereby invalidating the often-used assumption of model stationarity. The streamflow in UGB under the nonstationary model condition is found to reduce in future. The flows are also found to be sensitive to changes in land use. Segregation results suggest that model stationarity assumption and GCMs along with their interactions with emission scenarios, act as dominant sources of uncertainty. This paper provides a generalized framework for hydrologists to examine stationarity assumption of models before considering them

  19. Structural Equation Model for Evaluating Factors Affecting Quality of Social Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    Shahid Hussain

    2018-05-01

    Full Text Available The quality of the constructed social infrastructure project has been considered a necessary measure for the sustainability of projects. Studies on factors affecting project quality have used various techniques and methods to explain the relationships between particular variables. Unexpectedly, Structural Equation Modeling (SEM has acquired very little concern in factors affecting project quality studies. To address this limitation in the body of knowledge, the objective of this study was to apply the SEM approach and build a model that explained and identified the critical factors affecting quality in social infrastructure projects. The authors developed a quantitative approach using smart-PLS version 3.2.7. This study shed light on the views of different experts based on their experience in public construction projects in Pakistan. Particularly, the authors aimed to find out the relationships between construction, stakeholders, materials, design, and external factors, and how these relate to project quality. The findings of this study revealed that the R2 value of the model was scored at 0.749, which meant that the five exogenous latent constructs collectively explained 74.9% of the variance in project quality. The Goodness-of-Fit of the model was 0.458. The construction related factor was the most important out of the five constructs. This study determined that better planning and monitoring and evaluation should be developed to better address and control the quality defects by decision-makers, project managers as well as contractors. These findings might support practitioners and decision makers to focus on quality related problems that might occur in their current or future projects.

  20. Project 2010 For Dummies

    CERN Document Server

    Muir, Nancy C

    2010-01-01

    A friendly reference guide to Microsoft Project, the leading enterprise project management software. As project management software, Microsoft Project allows you to oversee your business activities effectively. You can manage resources, share project info, perform modeling and scenario analysis, and standardize reporting processes. This easy-to-understand guide is completely updated to cover the latest changes and newest enhancements to Project 2010 and shows you how to get Project 2010 to work for you. After an introduction to basic project management concepts, you'll discover the mechanics o

  1. Power Grid Construction Project Portfolio Optimization Based on Bi-level programming model

    Science.gov (United States)

    Zhao, Erdong; Li, Shangqi

    2017-08-01

    As the main body of power grid operation, county-level power supply enterprises undertake an important emission to guarantee the security of power grid operation and safeguard social power using order. The optimization of grid construction projects has been a key issue of power supply capacity and service level of grid enterprises. According to the actual situation of power grid construction project optimization of county-level power enterprises, on the basis of qualitative analysis of the projects, this paper builds a Bi-level programming model based on quantitative analysis. The upper layer of the model is the target restriction of the optimal portfolio; the lower layer of the model is enterprises’ financial restrictions on the size of the enterprise project portfolio. Finally, using a real example to illustrate operation proceeding and the optimization result of the model. Through qualitative analysis and quantitative analysis, the bi-level programming model improves the accuracy and normative standardization of power grid enterprises projects.

  2. Development and application of new quality model for software projects.

    Science.gov (United States)

    Karnavel, K; Dillibabu, R

    2014-01-01

    The IT industry tries to employ a number of models to identify the defects in the construction of software projects. In this paper, we present COQUALMO and its limitations and aim to increase the quality without increasing the cost and time. The computation time, cost, and effort to predict the residual defects are very high; this was overcome by developing an appropriate new quality model named the software testing defect corrective model (STDCM). The STDCM was used to estimate the number of remaining residual defects in the software product; a few assumptions and the detailed steps of the STDCM are highlighted. The application of the STDCM is explored in software projects. The implementation of the model is validated using statistical inference, which shows there is a significant improvement in the quality of the software projects.

  3. An incremental procedure model for e-learning projects at universities

    Directory of Open Access Journals (Sweden)

    Pahlke, Friedrich

    2006-11-01

    Full Text Available E-learning projects at universities are produced under different conditions than in industry. The main characteristic of many university projects is that these are realized quasi in a solo effort. In contrast, in private industry the different, interdisciplinary skills that are necessary for the development of e-learning are typically supplied by a multimedia agency.A specific procedure tailored for the use at universities is therefore required to facilitate mastering the amount and complexity of the tasks.In this paper an incremental procedure model is presented, which describes the proceeding in every phase of the project. It allows a high degree of flexibility and emphasizes the didactical concept – instead of the technical implementation. In the second part, we illustrate the practical use of the theoretical procedure model based on the project “Online training in Genetic Epidemiology”.

  4. A Model of Project and Organisational Dynamics

    OpenAIRE

    Jenny Leonard

    2012-01-01

    The strategic, transformational nature of many information systems projects is now widely understood. Large-scale implementations of systems are known to require significant management of organisational change in order to be successful. Moreover, projects are rarely executed in isolation – most organisations have a large programme of projects being implemented at any one time. However, project and value management methodologies provide ad hoc definitions of the relationship between a project ...

  5. Impact evaluation in multicultural educational projects : case: ADAPTYKES project

    OpenAIRE

    Kuusisto, Miika

    2014-01-01

    The objective of this thesis was to examine the common evaluation concepts of the European Union’s funded projects. Such concepts inter alia are effectiveness, impacts and sustainability. The aim was to study how these are realized in multicultural educational case–project in a context, where the project is funded by the European Commission’s Leonardo DaVinci Programme. Thesis introduces two evaluation approaches, which are Logical Framework Approach and Realistic evaluation model. The fi...

  6. Momentum projection and relativistic boost of solitons: Coherent states and projection

    International Nuclear Information System (INIS)

    Luebeck, E.G.; Birse, M.C.; Henley, E.M.; Wilets, L.

    1986-01-01

    We present a method for calculating center-of-mass corrections to hadron properties in soliton models and we apply the method to the soliton bag model. A coherent state is used to provide a quantum wave function corresponding to the mean-field approximation. This state is projected onto a zero-momentum eigenstate. States of nonzero momentum can be constructed from this with a Lorentz boost operator. Hence center-of-mass corrections can be made in a properly relativistic way. The energy of the projected zero-momentum state is the hadron mass with spurious center-of-mass energy removed. We apply a variational principle to our projected state and use three ''virial theorems'' to test our approximate solution. We also study projection of general one-mode states. Projection reduces the nucleon energy by up to 25%. Variation after projection gives a further reduction of less than 20%. Somewhat larger reductions in the energy are found for meson states

  7. Project Communications Management

    OpenAIRE

    José C. Santiago-Guevara; Mauricio Rojas-Contreras; Luis A. Esteban-Villamizar

    2013-01-01

    This article presents a review in relation to the object of study: Communications Management as an important factor in the management of projects. The review includes the most relevant and most renowned authors in the field of project management, focusing on telecommunications projects, which lets you define a communications management model.

  8. Incentive Model Based on Cooperative Relationship in Sustainable Construction Projects

    Directory of Open Access Journals (Sweden)

    Guangdong Wu

    2017-07-01

    Full Text Available Considering the cooperative relationship between owners and contractors in sustainable construction projects, as well as the synergistic effects created by cooperative behaviors, a cooperative incentive model was developed using game theory. The model was formulated and analyzed under both non-moral hazard and moral hazard situations. Then, a numerical simulation and example were proposed to verify the conclusions derived from the model. The results showed that the synergistic effect increases the input intensity of one party’s resource transfer into the increase of marginal utility of the other party, thus the owner and contractor are willing to enhance their levels of effort. One party’s optimal benefit allocation coefficient is positively affected by its own output efficiency, and negatively affected by the other party’s output efficiency. The effort level and expected benefits of the owner and contractor can be improved by enhancing the cooperative relationship between the two parties, as well as enhancing the net benefits of a sustainable construction project. The synergistic effect cannot lower the negative effect of moral hazard behaviors during the implementation of sustainable construction projects. Conversely, the higher levels of the cooperative relationship, the wider the gaps amongst the optimal values under both non-moral hazard and moral hazard situations for the levels of effort, expected benefits and net project benefits. Since few studies to date have emphasized the effects of cooperative relationship on sustainable construction projects, this study constructed a game-based incentive model to bridge the gaps. This study contributes significant theoretical and practical insights into the management of cooperation amongst stakeholders, and into the enhancement of the overall benefits of sustainable construction projects.

  9. Projection pursuit water quality evaluation model based on chicken swam algorithm

    Science.gov (United States)

    Hu, Zhe

    2018-03-01

    In view of the uncertainty and ambiguity of each index in water quality evaluation, in order to solve the incompatibility of evaluation results of individual water quality indexes, a projection pursuit model based on chicken swam algorithm is proposed. The projection index function which can reflect the water quality condition is constructed, the chicken group algorithm (CSA) is introduced, the projection index function is optimized, the best projection direction of the projection index function is sought, and the best projection value is obtained to realize the water quality evaluation. The comparison between this method and other methods shows that it is reasonable and feasible to provide decision-making basis for water pollution control in the basin.

  10. Technological Innovation Projects: Proposal For an Integrative Model Between Project Management and Knowledge Management in a Customer-Supplier Perspective

    Directory of Open Access Journals (Sweden)

    Edval da Silva Tavares

    2014-10-01

    Full Text Available In face of strong competition, companies in Brazil have increased their financial investments in automation, offering new products and services and reducing operating costs. These companies are focusing their efforts on core competencies and, therefore, they often lack the internal expertise to implement new projects, especially those that bring technological innovation. For this reason, we use the processes of outsourcing or subcontracting to help implement such projects. The unit of analysis in this study is the project and the object of the study to analyze the process of knowledge transfer from a provider to a customer during the duration of the project, which involves new technologies. The main motivation of this work is to address the acquisition and retention of new knowledge related to projects designed for business customers. We have developed a study of three cases of multiple financial firms that buy new technologies and two suppliers of information technology. As a practical result, a management model of knowledge transfer and retention of knowledge in client companies is proposed and incorporated into project management.

  11. The Okapi Projects.

    Science.gov (United States)

    Keen, Michael

    1997-01-01

    Examines general issues in conducting information retrieval research. Topics include the Okapi information retrieval system and its probabilistic model; the Cranfield projects, concerning recall and precision; the SMART project with its vector-space model; evaluation methodology, including laboratory evaluation of interactive systems; and…

  12. Project report - an overview of the project and experiences with project management

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Mikkelsen, Bent Egberg

    1996-01-01

    A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project.......A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project....

  13. SELECTION OF EFFECTIVE MODELS OF PROJECT IMPLEMENTATION IN A CHANGING FINANCIAL SITUATION

    Directory of Open Access Journals (Sweden)

    Александр Иванович МЕНЕЙЛЮК

    2015-06-01

    Full Text Available The article describes the methods of selecting effective models of construction projects of residential buildings and recommendations for its use. The technique is based on the construction of the models in the program Microsoft Project and analysis using the program COMPEX. Methods can be used not only for building projects. It is especially effective in a variable financial situation.

  14. Pengembangan Model Outdoor Learning melalui Project Berbasis Local Wisdom dalam Pembelajaran Fisika

    Directory of Open Access Journals (Sweden)

    Indah kurnia Putri Damayanti

    2017-12-01

    Full Text Available Abstrak Penelitian ini bertujuan untuk: (1 menghasilkan model outdoor learning melalui project berbasis local wisdom yang layak digunakan dalam pembelajaran fisika, (2 mengetahui keefektifan penggunaan model outdoor learning melalui project berbasis local wisdom. Penelitian pengembangan ini menggunakan metode pengembangan R & D (Research dan Development. Pada tahap Development, peneliti mengadopsi model 4D, yaitu Define, Design, Develop, dan Disseminate. Hasil penelitian menunjukkan bahwa model outdoor learning melalui project berbasis local wisdom yang dikembangkan layak digunakan dari segi produk pendukung pembelajaran yang memenuhi kriteria sangat tinggi menurut para ahli, praktis menurut guru dan peserta didik. Lembar observasi yang memenuhi kriteria valid dan reliabel berdasarkan hasil ICC dan tes hasil belajar yang memenuhi kriteria valid dan reliabel berdasarkan hasil Quest. Selain itu, model outdoor learning melalui project berbasis local wisdom lebih efektif digunakan dalam pembelajaran fisika dilihat dari hasil analisis multivariate dan GLMMDs yang memperoleh nilai signifikansi 0,000 dan MD yang tinggi.   AbstractThis research was aimed to: (1 produce outdoor learning via project based suitable local wisdom model used in physics learning, (2 know the effectiveness in using outdoor learning via project based local wisdom model. This developing research used a R & D method (Research and Development. On Development step, the researcher adopted 4D model, they were Define, Design, Develop, dan Dissemination. The results showed that the developed outdoor learning via project based local wisdom model was suitable to be used in terms of learning support product that was in very high category according expert, practical according teacher and students. In addition the observation sheet was in valid criteria and reliabel based on ICC and the learning outcome test was in valid criteria and reliabel based on Quest. Besides, outdoor learning via

  15. The PASS project architectural model

    International Nuclear Information System (INIS)

    Day, C.T.; Loken, S.; Macfarlane, J.F.

    1994-01-01

    The PASS project has as its goal the implementation of solutions to the foreseen data access problems of the next generation of scientific experiments. The architectural model results from an evaluation of the operational and technical requirements and is described in terms of an abstract reference model, an implementation model and a discussion of some design aspects. The abstract reference model describes a system that matches the requirements in terms of its components and the mechanisms by which they communicate, but does not discuss policy or design issues that would be necessary to match the model to an actual implementation. Some of these issues are discussed, but more detailed design and simulation work will be necessary before choices can be made

  16. A Management Maturity Model (MMM for project-based organisational performance assessment

    Directory of Open Access Journals (Sweden)

    Craig Langston

    2016-12-01

    Full Text Available Common sense suggests that organisations are more likely to deliver successful projects if they have systems in place that reflect a mature project environment based on a culture of continuous improvement. This paper develops and discusses a Management Maturity Model (MMM to assess the maturity of project management organisations through a customisable, systematic, strategic and practical methodology inspired from the seminal work of Darwin, Deming, Drucker and Daniel. The model presented is relevant to organisations, such as construction and engineering companies, that prefer to use the Project Management Body of Knowledge (PMBOK™ Guide published by the Project Management Institute (PMI, but without the disadvantages of excessive time and cost commitments and a ‘one size fits all’ approach linked to rigid increments of maturity. It offers a game-changing advance in the application of project-based organisational performance assessment compared to existing market solutions that are unnecessarily complex. The feasibility of MMM is field-tested using a medium-sized data centre infrastructure firm in Tehran.

  17. Predicting Defects Using Information Intelligence Process Models in the Software Technology Project.

    Science.gov (United States)

    Selvaraj, Manjula Gandhi; Jayabal, Devi Shree; Srinivasan, Thenmozhi; Balasubramanie, Palanisamy

    2015-01-01

    A key differentiator in a competitive market place is customer satisfaction. As per Gartner 2012 report, only 75%-80% of IT projects are successful. Customer satisfaction should be considered as a part of business strategy. The associated project parameters should be proactively managed and the project outcome needs to be predicted by a technical manager. There is lot of focus on the end state and on minimizing defect leakage as much as possible. Focus should be on proactively managing and shifting left in the software life cycle engineering model. Identify the problem upfront in the project cycle and do not wait for lessons to be learnt and take reactive steps. This paper gives the practical applicability of using predictive models and illustrates use of these models in a project to predict system testing defects thus helping to reduce residual defects.

  18. Building information models for astronomy projects

    Science.gov (United States)

    Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro

    2012-09-01

    A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.

  19. Implementation of the model project: Ghanaian experience

    International Nuclear Information System (INIS)

    Schandorf, C.; Darko, E.O.; Yeboah, J.; Asiamah, S.D.

    2003-01-01

    Upgrading of the legal infrastructure has been the most time consuming and frustrating part of the implementation of the Model project due to the unstable system of governance and rule of law coupled with the low priority given to legislation on technical areas such as safe applications of Nuclear Science and Technology in medicine, industry, research and teaching. Dwindling Governmental financial support militated against physical and human resource infrastructure development and operational effectiveness. The trend over the last five years has been to strengthen the revenue generation base of the Radiation Protection Institute through good management practices to ensure a cost effective use of the limited available resources for a self-reliant and sustainable radiation and waste safety programme. The Ghanaian experience regarding the positive and negative aspects of the implementation of the Model Project is highlighted. (author)

  20. Projected 21st century decrease in marine productivity: a multi-model analysis

    Directory of Open Access Journals (Sweden)

    M. Steinacher

    2010-03-01

    Full Text Available Changes in marine net primary productivity (PP and export of particulate organic carbon (EP are projected over the 21st century with four global coupled carbon cycle-climate models. These include representations of marine ecosystems and the carbon cycle of different structure and complexity. All four models show a decrease in global mean PP and EP between 2 and 20% by 2100 relative to preindustrial conditions, for the SRES A2 emission scenario. Two different regimes for productivity changes are consistently identified in all models. The first chain of mechanisms is dominant in the low- and mid-latitude ocean and in the North Atlantic: reduced input of macro-nutrients into the euphotic zone related to enhanced stratification, reduced mixed layer depth, and slowed circulation causes a decrease in macro-nutrient concentrations and in PP and EP. The second regime is projected for parts of the Southern Ocean: an alleviation of light and/or temperature limitation leads to an increase in PP and EP as productivity is fueled by a sustained nutrient input. A region of disagreement among the models is the Arctic, where three models project an increase in PP while one model projects a decrease. Projected changes in seasonal and interannual variability are modest in most regions. Regional model skill metrics are proposed to generate multi-model mean fields that show an improved skill in representing observation-based estimates compared to a simple multi-model average. Model results are compared to recent productivity projections with three different algorithms, usually applied to infer net primary production from satellite observations.

  1. Advanced Ground Systems Maintenance Physics Models For Diagnostics Project

    Science.gov (United States)

    Perotti, Jose M.

    2015-01-01

    The project will use high-fidelity physics models and simulations to simulate real-time operations of cryogenic and systems and calculate the status/health of the systems. The project enables the delivery of system health advisories to ground system operators. The capability will also be used to conduct planning and analysis of cryogenic system operations. This project will develop and implement high-fidelity physics-based modeling techniques tosimulate the real-time operation of cryogenics and other fluids systems and, when compared to thereal-time operation of the actual systems, provide assessment of their state. Physics-modelcalculated measurements (called “pseudo-sensors”) will be compared to the system real-timedata. Comparison results will be utilized to provide systems operators with enhanced monitoring ofsystems' health and status, identify off-nominal trends and diagnose system/component failures.This capability can also be used to conduct planning and analysis of cryogenics and other fluidsystems designs. This capability will be interfaced with the ground operations command andcontrol system as a part of the Advanced Ground Systems Maintenance (AGSM) project to helpassure system availability and mission success. The initial capability will be developed for theLiquid Oxygen (LO2) ground loading systems.

  2. Managing complex, high risk projects a guide to basic and advanced project management

    CERN Document Server

    Marle, Franck

    2016-01-01

    Maximizing reader insights into project management and handling complexity-driven risks, this book explores propagation effects, non-linear consequences, loops, and the emergence of positive properties that may occur over the course of a project. This book presents an introduction to project management and analysis of traditional project management approaches and their limits regarding complexity. It also includes overviews of recent research works about project complexity modelling and management as well as project complexity-driven issues. Moreover, the authors propose their own new approaches, new methodologies and new tools which may be used by project managers and/or researchers and/or students in the management of their projects. These new elements include project complexity definitions and frameworks, multi-criteria approaches for project complexity measurement, advanced methodologies for project management (propagation studies to anticipate potential behaviour of the project, and clustering approaches...

  3. MORE. Management of Requirements in NPP modernisation projects - Project report 2005

    International Nuclear Information System (INIS)

    Thunem, A.P.J.; Fredriksen, R.; Thunem, H.P.J.; Ventae, O.; Valkonen, J.; Holmberg, J.E.

    2006-04-01

    The overall objective of the project MORE is to improve the means for managing the large amounts of evolving requirements in Nordic NPP modernisation projects. In accordance to this objective, the activity will facilitate the industrial utilisation of the research results from the project TACO. On the basis of experiences in the Nordic countries, the overall aim of the TACO project has been to identify the best practices and most important criteria for ensuring effective communication in relation to requirements elicitation and analysis, understandability of requirements to all parties, and traceability of requirements. The project resulted in the development of a traceability model for handling requirements from their origins and through their final shapes. Particular emphasis for the MORE project in 2005 was put on utilising a prototype of a tool (TRACE) intended to support an adopted approach to dependable requirements engineering, suitable for modelling and handling large amounts of requirements related to all stages of the systems development process and not only those traditionally including requirements at high-level stages. (au)

  4. MORE. Management of Requirements in NPP modernisation projects - Project report 2005

    Energy Technology Data Exchange (ETDEWEB)

    Thunem, A.P.J.; Fredriksen, R.; Thunem, H.P.J. [IFE (Norway); Ventae, O.; Valkonen, J.; Holmberg, J.E. [VTT Technical Research Centre of Finland (Finland)

    2006-04-15

    The overall objective of the project MORE is to improve the means for managing the large amounts of evolving requirements in Nordic NPP modernisation projects. In accordance to this objective, the activity will facilitate the industrial utilisation of the research results from the project TACO. On the basis of experiences in the Nordic countries, the overall aim of the TACO project has been to identify the best practices and most important criteria for ensuring effective communication in relation to requirements elicitation and analysis, understandability of requirements to all parties, and traceability of requirements. The project resulted in the development of a traceability model for handling requirements from their origins and through their final shapes. Particular emphasis for the MORE project in 2005 was put on utilising a prototype of a tool (TRACE) intended to support an adopted approach to dependable requirements engineering, suitable for modelling and handling large amounts of requirements related to all stages of the systems development process and not only those traditionally including requirements at high-level stages. (au)

  5. Cacao Intensification in Sulawesi: A Green Prosperity Model Project

    Energy Technology Data Exchange (ETDEWEB)

    Moriarty, K.; Elchinger, M.; Hill, G.; Katz, J.; Barnett, J.

    2014-09-01

    NREL conducted eight model projects for Millennium Challenge Corporation's (MCC) Compact with Indonesia. Green Prosperity, the largest project of the Compact, seeks to address critical constraints to economic growth while supporting the Government of Indonesia's commitment to a more sustainable, less carbon-intensive future. This study evaluates techniques to improve cacao farming in Sulawesi Indonesia with an emphasis on Farmer Field Schools and Cocoa Development Centers to educate farmers and for train the trainer programs. The study estimates the economic viability of cacao farming if smallholder implement techniques to increase yield as well as social and environmental impacts of the project.

  6. Applying a Hybrid MCDM Model for Six Sigma Project Selection

    Directory of Open Access Journals (Sweden)

    Fu-Kwun Wang

    2014-01-01

    Full Text Available Six Sigma is a project-driven methodology; the projects that provide the maximum financial benefits and other impacts to the organization must be prioritized. Project selection (PS is a type of multiple criteria decision making (MCDM problem. In this study, we present a hybrid MCDM model combining the decision-making trial and evaluation laboratory (DEMATEL technique, analytic network process (ANP, and the VIKOR method to evaluate and improve Six Sigma projects for reducing performance gaps in each criterion and dimension. We consider the film printing industry of Taiwan as an empirical case. The results show that our study not only can use the best project selection, but can also be used to analyze the gaps between existing performance values and aspiration levels for improving the gaps in each dimension and criterion based on the influential network relation map.

  7. Benchmarking of wind farm scale wake models in the EERA - DTOC project

    DEFF Research Database (Denmark)

    Réthoré, Pierre-Elouan; Hansen, Kurt Schaldemose; Barthelmie, R.J.

    2013-01-01

    -flow to combine wind farm (micro) and cluster (meso) scale wake models. For this purpose, a benchmark campaign is organized on the existing wind farm wake models available within the project, in order to identify which model would be the most appropriate for this coupling. A number of standardized wake cases......Designing offshore wind farms next to existing or planned wind farm clusters has recently become a common practice in the North Sea. These types of projects face unprecedented challenges in term of wind energy siting. The currently ongoing European project FP7 EERA - DTOC (Design Tool for Offshore...... wind farm Clusters) is aiming at providing a new type of model work-flow to address this issue. The wake modeling part of the EERA - DTOC project is to improve the fundamental understanding of wind turbine wakes and modeling. One of these challenges is to create a new kind of wake modeling work...

  8. Application of an integrated model for evaluation and optimization of business projects portfolios

    Directory of Open Access Journals (Sweden)

    Camila Costa Dutra

    2016-12-01

    Full Text Available This work presents an application of an integrated model for the evaluation and probabilistic optimization of projects portfolios, integrating economic, risk and social and environmental impacts analysis. The model uses the Monte Carlo simulation and linear programming techniques for treatment of uncertainties and optimization of projects portfolio. The integrated model was applied in a Brazilian company of electricity distributions. The portfolio of selected projects was related to the expansion of the supply of electricity in a town in the south of the country and the analysis horizon was set in ten years. The aim of the application was to maximize the return for the implementation of a substation and a transmission line in a set of projects, which are diverse in terms of costs, benefits and environmental and social impacts. As a result, the model generates: i an analysis of each individual projects, from budget information (costs and benefits involved and estimation of social and environmental impacts generated by the project and the risks (uncertainties involved and ii the optimum combination of projects that the company should prioritize to ensure the best financial return and lower social and environmental impacts, thus generating an optimal portfolio.

  9. APPLICATION OF AN INTEGRATED MODEL FOR EVALUATION AND OPTIMIZATION OF BUSINESS PROJECTS PORTFOLIOS

    Directory of Open Access Journals (Sweden)

    Maria Auxiliadora Cannarozzo Tinoco

    2016-12-01

    Full Text Available This work presents an application of an integrated model for the evaluation and probabilistic optimization of projects portfolios, integrating economic, risk and social and environmental impacts analysis. The model uses the Monte Carlo simulation and linear programming techniques for treatment of uncertainties and optimization of projects portfolio. The integrated model was applied in a Brazilian company of electricity distributions. The portfolio of selected projects was related to the expansion of the supply of electricity in a town in the south of the country and the analysis horizon was set in ten years. The aim of the application was to maximize the return for the implementation of a substation and a transmission line in a set of projects, which are diverse in terms of costs, benefits and environmental and social impacts. As a result, the model generates: i an analysis of each individual projects, from budget information (costs and benefits involved and estimation of social and environmental impacts generated by the project and the risks (uncertainties involved and ii the optimum combination of projects that the company should prioritize to ensure the best financial return and lower social and environmental impacts, thus generating an optimal portfolio

  10. Goleman-Boyatzis Model of Emotional Intelligence for Dealing with Problems in Project Management

    Directory of Open Access Journals (Sweden)

    Peter Vincent Livesey

    2017-03-01

    Full Text Available As projects grow in size and complexity the sizes of teams needed to manage them also increases. This places greater emphasis on the need for the project manager to develop people management skills, commonly called soft skills, of which emotional intelligence (EI has been recognised as an important component. The objective of this research was to investigate the relevance of the Goleman-Boyatzis model of EI in dealing with the problems in large projects identified via a literature review. To achieve this end, a Delphi study using project managers who had been involved in the management of projects in excess of $500 million was used. The responses from the Delphi panel were analysed and the results showed that the competencies contained in the Goleman-Boyatzis model had a relevance of 95% or greater to the problems presented to the panel. A ranking of the various competencies contained within the model was also developed, some competencies being found to be more important than others. By confirming the importance of emotional intelligence, as described by the model, this research adds to the understanding of the necessary skills needed by a project manager to successfully manage large projects.

  11. Climate change and watershed mercury export: a multiple projection and model analysis.

    Science.gov (United States)

    Golden, Heather E; Knightes, Christopher D; Conrads, Paul A; Feaster, Toby D; Davis, Gary M; Benedict, Stephen T; Bradley, Paul M

    2013-09-01

    Future shifts in climatic conditions may impact watershed mercury (Hg) dynamics and transport. An ensemble of watershed models was applied in the present study to simulate and evaluate the responses of hydrological and total Hg (THg) fluxes from the landscape to the watershed outlet and in-stream THg concentrations to contrasting climate change projections for a watershed in the southeastern coastal plain of the United States. Simulations were conducted under stationary atmospheric deposition and land cover conditions to explicitly evaluate the effect of projected precipitation and temperature on watershed Hg export (i.e., the flux of Hg at the watershed outlet). Based on downscaled inputs from 2 global circulation models that capture extremes of projected wet (Community Climate System Model, Ver 3 [CCSM3]) and dry (ECHAM4/HOPE-G [ECHO]) conditions for this region, watershed model simulation results suggest a decrease of approximately 19% in ensemble-averaged mean annual watershed THg fluxes using the ECHO climate-change model and an increase of approximately 5% in THg fluxes with the CCSM3 model. Ensemble-averaged mean annual ECHO in-stream THg concentrations increased 20%, while those of CCSM3 decreased by 9% between the baseline and projected simulation periods. Watershed model simulation results using both climate change models suggest that monthly watershed THg fluxes increase during the summer, when projected flow is higher than baseline conditions. The present study's multiple watershed model approach underscores the uncertainty associated with climate change response projections and their use in climate change management decisions. Thus, single-model predictions can be misleading, particularly in developmental stages of watershed Hg modeling. Copyright © 2013 SETAC.

  12. Climate change and watershed mercury export: a multiple projection and model analysis

    Science.gov (United States)

    Golden, Heather E.; Knightes, Christopher D.; Conrads, Paul; Feaster, Toby D.; Davis, Gary M.; Benedict, Stephen T.; Bradley, Paul M.

    2013-01-01

    Future shifts in climatic conditions may impact watershed mercury (Hg) dynamics and transport. An ensemble of watershed models was applied in the present study to simulate and evaluate the responses of hydrological and total Hg (THg) fluxes from the landscape to the watershed outlet and in-stream THg concentrations to contrasting climate change projections for a watershed in the southeastern coastal plain of the United States. Simulations were conducted under stationary atmospheric deposition and land cover conditions to explicitly evaluate the effect of projected precipitation and temperature on watershed Hg export (i.e., the flux of Hg at the watershed outlet). Based on downscaled inputs from 2 global circulation models that capture extremes of projected wet (Community Climate System Model, Ver 3 [CCSM3]) and dry (ECHAM4/HOPE-G [ECHO]) conditions for this region, watershed model simulation results suggest a decrease of approximately 19% in ensemble-averaged mean annual watershed THg fluxes using the ECHO climate-change model and an increase of approximately 5% in THg fluxes with the CCSM3 model. Ensemble-averaged mean annual ECHO in-stream THg concentrations increased 20%, while those of CCSM3 decreased by 9% between the baseline and projected simulation periods. Watershed model simulation results using both climate change models suggest that monthly watershed THg fluxes increase during the summer, when projected flow is higher than baseline conditions. The present study's multiple watershed model approach underscores the uncertainty associated with climate change response projections and their use in climate change management decisions. Thus, single-model predictions can be misleading, particularly in developmental stages of watershed Hg modeling.

  13. Liquidus Projection and Thermodynamic Modeling of a Sn-Ag-Zn System

    Science.gov (United States)

    Chen, Sinn-wen; Chiu, Wan-ting; Gierlotka, Wojciech; Chang, Jui-shen; Wang, Chao-hong

    2017-12-01

    Sn-Ag-Zn alloys are promising Pb-free solders. In this study, the Sn-Ag-Zn liquidus projection was determined, and the Sn-Ag-Zn thermodynamic modeling was developed. Various Sn-Ag-Zn alloys were prepared. Their as-cast microstructures and primary solidification phases were examined. The invariant reaction temperatures of the ternary Sn-Ag-Zn system were determined. The liquidus projection of the Sn-Ag-Zn ternary system was constructed. It was found that the Sn-Ag-Zn ternary system has eight primary solidification phases: ɛ2-AgZn3, γ-Ag5Zn8, β-AgZn, ζ-Ag4Sn, (Ag), ɛ1-Ag3Sn, β-(Sn) and (Zn) phases. There are eight ternary invariant reactions, and the liquid + (Ag) = β-AgZn + ζ-Ag4Sn reaction is of the highest temperature at 935.5 K. Thermodynamic modeling of the ternary Sn-Ag-Zn system was also carried out in this study based on the thermodynamic models of the three constituent binary systems and the experimentally determined liquidus projection. The liquidus projection and the isothermal sections are calculated. The calculated and experimentally determined liquidus projections are in good agreement.

  14. Respiratory compensation in projection imaging using a magnification and displacement model

    International Nuclear Information System (INIS)

    Crawford, C.R.; King, K.F.; Ritchie, C.J.; Godwin, J.D.

    1996-01-01

    Respiratory motion during the collection of computed tomography (CT) projections generates structured artifacts and a loss of resolution that can render the scans unusable. This motion is problematic in scans of those patients who cannot suspend respiration, such as the very young or incubated patients. In this paper, the authors present an algorithm that can be used to reduce motion artifacts in CT scans caused by respiration. An approximate model for the effect of respiration is that the object cross section under interrogation experiences time-varying magnification and displacement along two axes. Using this model an exact filtered backprojection algorithm is derived for the case of parallel projections. The result is extended to generate an approximate reconstruction formula for fan-beam projections. Computer simulations and scans of phantoms on a commercial CT scanner validate the new reconstruction algorithms for parallel and fan-beam projections. Significant reduction in respiratory artifacts is demonstrated clinically when the motion model is satisfied. The method can be applied to projection data used in CT single photon emission computed tomography (SPECT), positron emission tomography (PET), and magnetic resonance imaging (MRI)

  15. One project`s waste is another project`s resource

    Energy Technology Data Exchange (ETDEWEB)

    Short, J.

    1997-02-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables.

  16. THE MODEL OF EXPERT SYSTEM FOR SCIENTIFIC PROJECTS EVALUATION IN HIGHER EDUCATIONAL INSTITUTIONS

    Directory of Open Access Journals (Sweden)

    Олександр Михайлович ВОЗНИЙ

    2015-05-01

    Full Text Available There have been proposed the model of the expert system for the assessment of research projects in higher educational institutions, based on estimates of probability. It allows to rank alternative projects and scenarios. The model is implemented through the software "Small expert system." The principle of calculating the probability of approval of research projects, which form the basis of the expert system, is based on Bayes' theorem. Expert system calculates the probability of approval of research projects by Ministry of Science and Education on the basis of the responses to questions about the content of the request for the execution of research projects. Questions are formed on the basis of the criteria by which experts of state authorities evaluate scientific research projects.

  17. PENGEMBANGAN TUGAS AKHIR MELALUI PROJECT BASED LEARNING MODEL UNTUK MENINGKATKAN GENERIC GREEN SKILLS SISWA

    Directory of Open Access Journals (Sweden)

    Ana Ana

    2015-02-01

    Full Text Available ABSTRACT The development of students’ final project through Project-based Learning (PBLapproach was conducted in the workshop of family resource management (FRM in 7th semester.PBL approach is expected to give contribution to students’ motivation and experience to finish their final assignments of FRM workshop. The objectives of the research are to: (1 develop PBL model for the students’final project; (2 produce learning instruments of PBL such as lesson plans, manual of FRM workshop, and scientific report of FRM workshop. The method of the study was using research and development of Plomp model and quasi experiment for testing the effectiveness of the model. The research subjects were the students from the class of 2009 and 2010 who joined FRM workshop course. The study produced model, lesson plans, and manual of FRM workshop as the outputs. The result showed that project based learning model was effective to improve the students’ generic green skills for project management, collaborative skills, and communicative competence. Keywords: final project, generic green skill, family resource management, Project-Based Learning

  18. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  19. Vague project start makes project success of outsourced software development projects uncertain

    OpenAIRE

    Savolainen, Paula

    2010-01-01

    peer-reviewed A definition of a project success includes at least three criteria: 1) meeting planning goals, 2) customer benefits, and 3) supplier benefits. This study aims to point out the importance of the definition of the project start, the project start date, and what work should be included in the project effort in order to ensure the supplier's benefits. The ambiguity of the project start risks the profitability of the project and therefore makes project success at least from suppli...

  20. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  1. Building Context with Tumor Growth Modeling Projects in Differential Equations

    Science.gov (United States)

    Beier, Julie C.; Gevertz, Jana L.; Howard, Keith E.

    2015-01-01

    The use of modeling projects serves to integrate, reinforce, and extend student knowledge. Here we present two projects related to tumor growth appropriate for a first course in differential equations. They illustrate the use of problem-based learning to reinforce and extend course content via a writing or research experience. Here we discuss…

  2. The Timber Resource Inventory Model (TRIM): a projection model for timber supply and policy analysis.

    Science.gov (United States)

    P.L. Tedder; R.N. La Mont; J.C. Kincaid

    1987-01-01

    TRIM (Timber Resource Inventory Model) is a yield table projection system developed for timber supply projections and policy analysis. TRIM simulates timber growth, inventories, management and area changes, and removals over the projection period. Programs in the TRIM system, card-by-card descriptions of required inputs, table formats, and sample results are presented...

  3. Construction project investment control model based on instant information

    Institute of Scientific and Technical Information of China (English)

    WANG Xue-tong

    2006-01-01

    Change of construction conditions always influences project investment by causing the loss of construction work time and extending the duration. To resolve such problem as difficult dynamic control in work construction plan, this article presents a concept of instant optimization by ways of adjustment operation time of each working procedure to minimize investment change. Based on this concept, its mathematical model is established and a strict mathematical justification is performed. An instant optimization model takes advantage of instant information in the construction process to duly complete adjustment of construction; thus we maximize cost efficiency of project investment.

  4. Methodologies of Project Management

    Directory of Open Access Journals (Sweden)

    Wojciech Macek

    2011-07-01

    Full Text Available This paper presents comparison of three most popular project management standardsbelonging to a wider group of models (for example, PMBOK, Prince 2, CMMI, ISO 10006,BS 6079, IPMA Competence Baseline, European Commission Project Cycle ManagementGuidelines. The author discusses methods of project management according to PMBoK,Prince 2 and ISO 10006, some chosen criteria and fields of knowledge, such as generalregulations of standards, project range management, resources management, and processesconnected with risk, systems of project quality management.

  5. Numerical modeling in photonic crystals integrated technology: the COPERNICUS Project

    DEFF Research Database (Denmark)

    Malaguti, Stefania; Armaroli, Andrea; Bellanca, Gaetano

    2011-01-01

    Photonic crystals will play a fundamental role in the future of optical communications. The relevance of the numerical modeling for the success of this technology is assessed by using some examples concerning the experience of the COPERNICUS Project.......Photonic crystals will play a fundamental role in the future of optical communications. The relevance of the numerical modeling for the success of this technology is assessed by using some examples concerning the experience of the COPERNICUS Project....

  6. Integrating semantic data models with project management

    Energy Technology Data Exchange (ETDEWEB)

    Wachter, R

    1982-01-01

    Summary form only given, as follows. The development of a data model for a project on the test and certification of computer-based information systems required a more expressive data model than that supplied by either the network, hierarchical or relational models. A data model was developed to describe the work environment and the work itself. This model is based on the entity-relationship data model of Chen and on heuristic principles of knowledge organisation used in artificial intelligence. The ER data model is reviewed and the extensions to the model are discussed.

  7. A model validation framework for climate change projection and impact assessment

    DEFF Research Database (Denmark)

    Madsen, Henrik; Refsgaard, Jens C.; Andréassian, Vazken

    2014-01-01

    methods for projection of climate change (single and ensemble model projections and space‐timesubstitution) and use of different data sources as proxy for future climate conditions (long historical records comprising non‐ stationarity, paleo data, and controlled experiments). The basic guiding principles...... proxy data, reflecting future conditions. This test can be used with both single and ensemble model projections as well as with space‐time‐substitutions. It is generally expected to be more powerful when applied to a model ensemble than to a single model. Since space‐timesubstitutions include...... a differential split‐sample test using best available proxy data that reflect the expected future conditions at the site being considered. Such proxy data may be obtained from long historical records comprising nonstationarity, paleo data, or controlled experiments. The test can be applied with different...

  8. Managing project complexity : A study into adapting early project phases to improve project performance in large engineering projects

    NARCIS (Netherlands)

    Bosch-Rekveldt, M.G.C.

    2011-01-01

    Engineering projects become increasingly more complex and project complexity is assumed to be one of the causes for projects being delivered late and over budget. However, what this project complexity actually comprised of was unclear. To improve the overall project performance, this study focuses

  9. A financing model to solve financial barriers for implementing green building projects.

    Science.gov (United States)

    Lee, Sanghyo; Lee, Baekrae; Kim, Juhyung; Kim, Jaejun

    2013-01-01

    Along with the growing interest in greenhouse gas reduction, the effect of greenhouse gas energy reduction from implementing green buildings is gaining attention. The government of the Republic of Korea has set green growth as its paradigm for national development, and there is a growing interest in energy saving for green buildings. However, green buildings may have financial barriers that have high initial construction costs and uncertainties about future project value. Under the circumstances, governmental support to attract private funding is necessary to implement green building projects. The objective of this study is to suggest a financing model for facilitating green building projects with a governmental guarantee based on Certified Emission Reduction (CER). In this model, the government provides a guarantee for the increased costs of a green building project in return for CER. And this study presents the validation of the model as well as feasibility for implementing green building project. In addition, the suggested model assumed governmental guarantees for the increased cost, but private guarantees seem to be feasible as well because of the promising value of the guarantee from CER. To do this, certification of Clean Development Mechanisms (CDMs) for green buildings must be obtained.

  10. Critical success factors in infrastructure projects

    Science.gov (United States)

    Zakaria, Siti Fairus; Zin, Rosli Mohamad; Mohamad, Ismail; Balubaid, Saeed; Mydin, Shaik Hussein; Mohd Rahim, E. M. Roodienyanto

    2017-11-01

    Construction of infrastructure project is different from buildings. The main difference is term of project site where infrastructure project need to command a long stretch while building mostly confine to a limited area. As such factors that are critical to infrastructure project may not be that significant to building project and vice versa. Flood mitigation can be classified under infrastructure projects under which their developments are planned by the government with the specific objective to reduce or avoid the negative effects of flood to the environment and livelihood. One of the indicators in project success is delay. The impact of project delay in construction industry is significant that it decelerates the projects implementation, specifically the government projects. This study attempted to identify and compare the success factors between infrastructure and building projects, as such comparison rarely found in the current literature. A model of flood mitigation projects' success factors was developed by merging the experts' views and reports from the existing literature. The experts' views were obtained from the responses to open-ended questions on the required fundamentals to achieve successful completion of flood mitigation projects. An affinity analysis was applied to these responses to develop the model. The developed model was then compared to the established success factors found in building project, extracted from the previous studies to identify the similarities and differences between the two models. This study would assist the government and construction players to become more effective in constructing successful flood mitigation projects for the future practice in a flood-prone country like Malaysia.

  11. Project network-oriented materials management policy for complex projects

    DEFF Research Database (Denmark)

    Dixit, Vijaya; Srivastava, Rajiv K; Chaudhuri, Atanu

    2015-01-01

    This work devises a materials management policy integrated with project network characteristics of complex projects. It proposes a relative quantitative measure, overall criticality (OC), for prioritisation of items based on penalty incurred due to their non-availability. In complex projects...... managerial tacit knowledge which provides them enough flexibility to provide information in real form. Computed OC values can be used for items prioritisation and as shortage cost coefficient in inventory models. The revised materials management policy was applied to a shipbuilding project. OC values were......, practicing managers find it difficult to measure OC of items because of the subjective factors and intractable nature of penalties involved. However, using their experience, they can linguistically identify the antecedents and relate them to consequent OC. This work adopts Fuzzy Set Theory to capture...

  12. PACTEL OECD project planning (PACO). PACTEL OECD project planning

    Energy Technology Data Exchange (ETDEWEB)

    Kouhia, V.; Purhonen, H. [Lappeenranta University of Technology (Finland)

    2004-07-01

    OECD launched the SETH project to investigate issues relevant for accident prevention and management and to ensure the existence of integral thermal hydraulic test facilities. The facilities included in the SETH project are PKL from Germany and PANDA from Switzerland. At the early stages of the SETH project an idea was raised to exploit the PACTEL facility in a similar OECD project. Without any external funding the analytical work in the required extent would not be possible within Lappeenranta University of Technology, the party responsible of operating PACTEL. This fact directed the PACO project proposal to be conducted for the SAFIR programme. The aim of the PACO project is to prepare a project proposal to OECD of a PACTEL related project. To attain this objective some preliminary analyses have to be performed to ensure the relevancy of the proposed topic. The low power situation, i.e. midloop state was chosen to be the topic in the PACO studies and project planning basis. The plan is to use PACTEL to examine vertical steam generator behaviour during the midloop operation and the following loss of residual heat removal system transient. Such a possibility is acknowledged with special alterations to PACTEL. The APROS code version 5.04.07 was selected as a tool for the preanalyses. The virtual simulation of the chosen experimental situation would give a preconception on the phenomena to be expected and the progression of the transient. Originally the PACO project was planned to continue only for a few months, ending up with the project proposal to OECD during the summer time 2004. During the pre-calculation process it became obvious that the time expected was not enough to establish good pre-calculation results. The reasons for this relates to time used to learn and adapt the use of the chosen code, improvements and corrections in modelling as well as the code ability to manage the special conditions defined for the project topic. Another aspect on completing a

  13. A whole stand basal area projection model for Appalachian hardwoods

    Science.gov (United States)

    John R. Brooks; Lichun Jiang; Matthew Perkowski; Benktesh Sharma

    2008-01-01

    Two whole-stand basal area projection models were developed for Appalachian hardwood stands. The proposed equations are an algebraic difference projection form based on existing basal area and the change in age, trees per acre, and/or dominant height. Average equation error was less than 10 square feet per acre and residuals exhibited no irregular trends.

  14. Microcomputer model for an analysis of the financial feasibility of a mining project

    International Nuclear Information System (INIS)

    Ciruelos, J.; Duchene, M.

    1983-01-01

    The model presented permits a simulation of the predicted profitability of a mining project at the stage of feasibility studies by making use of a simple individual computer, the Apple II. The model presented can be used to treat the following three areas: definition of the mode of financing the project and calculation of the financial flows which make it possible to evaluate the profitability of this project; analysis of sensitivity, which makes it possible to determine the most critical variables for the future of the project; analysis of the risk [fr

  15. Project Photofly: New 3d Modeling Online Web Service (case Studies and Assessments)

    Science.gov (United States)

    Abate, D.; Furini, G.; Migliori, S.; Pierattini, S.

    2011-09-01

    During summer 2010, Autodesk has released a still ongoing project called Project Photofly, freely downloadable from AutodeskLab web site until August 1 2011. Project Photofly based on computer-vision and photogrammetric principles, exploiting the power of cloud computing, is a web service able to convert collections of photographs into 3D models. Aim of our research was to evaluate the Project Photofly, through different case studies, for 3D modeling of cultural heritage monuments and objects, mostly to identify for which goals and objects it is suitable. The automatic approach will be mainly analyzed.

  16. A Multi-Objective Trade-Off Model in Sustainable Construction Projects

    Directory of Open Access Journals (Sweden)

    Guangdong Wu

    2017-10-01

    Full Text Available Based on the consideration of the relative importance of sustainability-related objectives and the inherent nature of sustainable construction projects, this study proposes that the contractor can balance the levels of efforts and resources used to improve the overall project sustainability. A multi-objective trade-off model using game theory was established and verified through simulation and numerical example under a moral hazard situation. Results indicate that effort levels of the contractor on sustainability-related objectives are positively related to the outcome coefficient while negatively to the coefficients of effort cost of the relevant objectives. High levels of the relative importance of sustainability-related objectives contribute to high levels of effort of the contractor. With the variation in effort levels and the coefficient of benefit allocation, the project net benefit increases before declining. The function of project benefit has a marked peak value, with an inverted “U” shape. An equilibrium always exists as for the given relative importance and coefficients of the effort costs of sustainability-related objectives. Under this condition, the owner may offer the contractor a less intense incentive and motivate the contractor reasonably arranging input resources. The coefficient of benefit allocation is affected by the contractor characteristic factors and the project characteristic factors. The owner should balance these two types of factors and select the most appropriate incentive mechanism to improve the project benefit. Meanwhile, the contractor can balance the relative importance of the objectives and arrange the appropriate levels of effort and resources to achieve a sustainability-related objective. Very few studies have emphasized the effects of the relative importance of sustainability-related objectives on the benefits of sustainable construction projects. This study therefore builds a multi-objective trade

  17. Progress report for project modeling Arctic barrier island-lagoon system response to projected Arctic warming

    Science.gov (United States)

    Erikson, Li H.; Gibbs, Ann E.; Richmond, Bruce M.; Storlazzi, Curt; B.M. Jones,

    2012-01-01

    Changes in Arctic coastal ecosystems in response to global warming may be some of the most severe on the planet. A better understanding and analysis of the rates at which these changes are expected to occur over the coming decades is crucial in order to delineate high-priority areas that are likely to be affected by climate changes. In this study we investigate the likelihood of changes to habitat-supporting barrier island – lagoon systems in response to projected changes in atmospheric and oceanographic forcing associated with Arctic warming. To better understand the relative importance of processes responsible for the current and future coastal landscape, key parameters related to increasing arctic temperatures are investigated and used to establish boundary conditions for models that simulate barrier island migration and inundation of deltaic deposits and low-lying tundra. The modeling effort investigates the dominance and relative importance of physical processes shaping the modern Arctic coastline as well as decadal responses due to projected conditions out to the year 2100.

  18. Incorporating socio-environmental considerations into project assessment models using multi-criteria analysis: A case study of Sri Lankan hydropower projects

    International Nuclear Information System (INIS)

    Morimoto, Risako

    2013-01-01

    Before commissioning any energy projects, conducting robust assessments of different options in terms of their economic and socio-environmental impacts is important for successful project implementation. Yet, there is currently a lack of tools that simultaneously assess sustainability impacts; instead, they are often investigated separately, which gives decision makers somehow disintegrated information. Thus the main objective of this study is to examine how to incorporate socio-environmental considerations into project assessment models. The multi-criteria analysis is applied to the case study of Sri Lankan hydropower projects as an illustrative example. The estimated quantitative relationship between economic, environmental and social impacts of hydropower development is presented in this study. Such estimation, using sustainability indicators of hydropower projects, enables us to understand marginal trade-offs among economic, environmental and social objectives of hydropower development. Hence, this would provide an overview of potential impacts of different scenarios that are designed to be implemented and indicate an optimum mix of hydropower generation. - Highlights: • This study provides an effective hydropower project evaluation method using the MCA. • The proposed tool shows the quantitative relationship explicitly. • Marginal trade-offs between sustainability objectives are presented

  19. The Scenario Model Intercomparison Project (ScenarioMIP) for CMIP6

    Energy Technology Data Exchange (ETDEWEB)

    O' Neill, Brian C.; Tebaldi, Claudia; van Vuuren, Detlef P.; Eyring, Veronika; Friedlingstein, Pierre; Hurtt, George; Knutti, Reto; Kriegler, Elmar; Lamarque, Jean-Francois; Lowe, Jason; Meehl, Gerald A.; Moss, Richard; Riahi, Keywan; Sanderson, Benjamin M.

    2016-01-01

    Projections of future climate change play a fundamental role in improving understanding of the climate system as well as characterizing societal risks and response options. The Scenario Model Intercomparison Project (ScenarioMIP) is the primary activity within Phase 6 of the Coupled Model Intercomparison Project (CMIP6) that will provide multi-model climate projections based on alternative scenarios of future emissions and land use changes produced with integrated assessment models. In this paper, we describe ScenarioMIP's objectives, experimental design, and its relation to other activities within CMIP6. The ScenarioMIP design is one component of a larger scenario process that aims to facilitate a wide range of integrated studies across the climate science, integrated assessment modeling, and impacts, adaptation, and vulnerability communities, and will form an important part of the evidence base in the forthcoming Intergovernmental Panel on Climate Change (IPCC) assessments. At the same time, it will provide the basis for investigating a number of targeted science and policy questions that are especially relevant to scenario-based analysis, including the role of specific forcings such as land use and aerosols, the effect of a peak and decline in forcing, the consequences of scenarios that limit warming to below 2 °C, the relative contributions to uncertainty from scenarios, climate models, and internal variability, and long-term climate system outcomes beyond the 21st century. To serve this wide range of scientific communities and address these questions, a design has been identified consisting of eight alternative 21st century scenarios plus one large initial condition ensemble and a set of long-term extensions, divided into two tiers defined by relative priority. Some of these scenarios will also provide a basis for variants planned to be run in other CMIP6-Endorsed MIPs to investigate questions related to specific forcings. Harmonized, spatially

  20. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  1. Mathematical Modeling Projects: Success for All Students

    Science.gov (United States)

    Shelton, Therese

    2018-01-01

    Mathematical modeling allows flexibility for a project-based experience. We share details of our regular capstone course, successful for virtually 100% of our math majors for almost two decades. Our research-like approach in this course accommodates a variety of student backgrounds and interests, and has produced some award-winning student…

  2. Developing a stochastic traffic volume prediction model for public-private partnership projects

    Science.gov (United States)

    Phong, Nguyen Thanh; Likhitruangsilp, Veerasak; Onishi, Masamitsu

    2017-11-01

    Transportation projects require an enormous amount of capital investment resulting from their tremendous size, complexity, and risk. Due to the limitation of public finances, the private sector is invited to participate in transportation project development. The private sector can entirely or partially invest in transportation projects in the form of Public-Private Partnership (PPP) scheme, which has been an attractive option for several developing countries, including Vietnam. There are many factors affecting the success of PPP projects. The accurate prediction of traffic volume is considered one of the key success factors of PPP transportation projects. However, only few research works investigated how to predict traffic volume over a long period of time. Moreover, conventional traffic volume forecasting methods are usually based on deterministic models which predict a single value of traffic volume but do not consider risk and uncertainty. This knowledge gap makes it difficult for concessionaires to estimate PPP transportation project revenues accurately. The objective of this paper is to develop a probabilistic traffic volume prediction model. First, traffic volumes were estimated following the Geometric Brownian Motion (GBM) process. Monte Carlo technique is then applied to simulate different scenarios. The results show that this stochastic approach can systematically analyze variations in the traffic volume and yield more reliable estimates for PPP projects.

  3. Project desk evaluation of a model project CPR/5/009 industrial scale irradiation of rice and other foodstuffs

    International Nuclear Information System (INIS)

    1996-11-01

    The project CPR/5/009 was approved in 1993 as a model project. The project objective was to build an industrial food irradiation facility for high quality rice and other foodstuffs, with a processing capacity of 5000-9000 tonnes per year. This capacity is large compared to many other facilities of the same type elsewhere. The success of the project waste to be measured against the full utilization of the facility with an acceptable availability factor. Disbursements on Agency inputs up to the end of June 1996 were $294,716 and consisted of one 100 kCi Co-60 source, quality control equipment, bag heat sealers, one expert mission and 13.5 months of training abroad. The current budget is $323,870, following two programme changes. The total cost of the project was estimated at $1,331,300 with the Chinese Government providing the balance. The major conclusions of this evaluation are as follows: Initially, the Agency overestimated the project and business management experience of the counterpart, and consequently underestimated the extent of support required. Providing support to counterparts in facing the key challenges of project management and business operation must be considered by the Agency in future projects of this type. The counterpart institution is also encouraged to emphasize these management issues in order to maximize sustainable and cost-effective utilization of such facilities. A new operational plan has been prepared by the counterpart for 1996 through 1998 which identifies seven customers requiring treatment of a total of 1000 tonnes per year of cereal grains and 1500 tonnes per year of other foodstuffs. This plan reflects a change in overall emphasis from supporting food supply security to ensuring the safety of foodstuffs. It is not clear whether this plan will support operation of the facility at full capacity. The team in place to operate the facility also needs further strengthening. (author). Figs, tabs

  4. Theory, modeling, and integrated studies in the Arase (ERG) project

    Science.gov (United States)

    Seki, Kanako; Miyoshi, Yoshizumi; Ebihara, Yusuke; Katoh, Yuto; Amano, Takanobu; Saito, Shinji; Shoji, Masafumi; Nakamizo, Aoi; Keika, Kunihiro; Hori, Tomoaki; Nakano, Shin'ya; Watanabe, Shigeto; Kamiya, Kei; Takahashi, Naoko; Omura, Yoshiharu; Nose, Masahito; Fok, Mei-Ching; Tanaka, Takashi; Ieda, Akimasa; Yoshikawa, Akimasa

    2018-02-01

    Understanding of underlying mechanisms of drastic variations of the near-Earth space (geospace) is one of the current focuses of the magnetospheric physics. The science target of the geospace research project Exploration of energization and Radiation in Geospace (ERG) is to understand the geospace variations with a focus on the relativistic electron acceleration and loss processes. In order to achieve the goal, the ERG project consists of the three parts: the Arase (ERG) satellite, ground-based observations, and theory/modeling/integrated studies. The role of theory/modeling/integrated studies part is to promote relevant theoretical and simulation studies as well as integrated data analysis to combine different kinds of observations and modeling. Here we provide technical reports on simulation and empirical models related to the ERG project together with their roles in the integrated studies of dynamic geospace variations. The simulation and empirical models covered include the radial diffusion model of the radiation belt electrons, GEMSIS-RB and RBW models, CIMI model with global MHD simulation REPPU, GEMSIS-RC model, plasmasphere thermosphere model, self-consistent wave-particle interaction simulations (electron hybrid code and ion hybrid code), the ionospheric electric potential (GEMSIS-POT) model, and SuperDARN electric field models with data assimilation. ERG (Arase) science center tools to support integrated studies with various kinds of data are also briefly introduced.[Figure not available: see fulltext.

  5. Funding Medical Research Projects: Taking into Account Referees' Severity and Consistency through Many-Faceted Rasch Modeling of Projects' Scores.

    Science.gov (United States)

    Tesio, Luigi; Simone, Anna; Grzeda, Mariuzs T; Ponzio, Michela; Dati, Gabriele; Zaratin, Paola; Perucca, Laura; Battaglia, Mario A

    2015-01-01

    The funding policy of research projects often relies on scores assigned by a panel of experts (referees). The non-linear nature of raw scores and the severity and inconsistency of individual raters may generate unfair numeric project rankings. Rasch measurement (many-facets version, MFRM) provides a valid alternative to scoring. MFRM was applied to the scores achieved by 75 research projects on multiple sclerosis sent in response to a previous annual call by FISM-Italian Foundation for Multiple Sclerosis. This allowed to simulate, a posteriori, the impact of MFRM on the funding scenario. The applications were each scored by 2 to 4 independent referees (total = 131) on a 10-item, 0-3 rating scale called FISM-ProQual-P. The rotation plan assured "connection" of all pairs of projects through at least 1 shared referee.The questionnaire fulfilled satisfactorily the stringent criteria of Rasch measurement for psychometric quality (unidimensionality, reliability and data-model fit). Arbitrarily, 2 acceptability thresholds were set at a raw score of 21/30 and at the equivalent Rasch measure of 61.5/100, respectively. When the cut-off was switched from score to measure 8 out of 18 acceptable projects had to be rejected, while 15 rejected projects became eligible for funding. Some referees, of various severity, were grossly inconsistent (z-std fit indexes less than -1.9 or greater than 1.9). The FISM-ProQual-P questionnaire seems a valid and reliable scale. MFRM may help the decision-making process for allocating funds to MS research projects but also in other fields. In repeated assessment exercises it can help the selection of reliable referees. Their severity can be steadily calibrated, thus obviating the need to connect them with other referees assessing the same projects.

  6. Four Approaches to Project Evaluation

    DEFF Research Database (Denmark)

    Laursen, Markus; Svejvig, Per; Rode, Anna Le Gerstrøm

    . Each of the framework’s four approaches provides a distinct evaluation that sheds light on some issues while leaving others unattended. Following these lines, the paper calls for more multi-faceted project evaluations. Introducing a framework that can help analyze existing evaluations and structure......There are many theoretical and practical reasons for evaluating projects – including explorative arguments focusing on expanding descriptive knowledge on project work as well as normative arguments focusing on improving prescriptive models of project performance. Despite the need for project...... management methodologies that work and combat project failure, and research methods that can assess effective project management and methodologies, as well as empirical research on the actuality of projects as practice, evaluation research on projects including project management and methodologies is scarce...

  7. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  8. A Financing Model to Solve Financial Barriers for Implementing Green Building Projects

    Science.gov (United States)

    Lee, Baekrae; Kim, Juhyung; Kim, Jaejun

    2013-01-01

    Along with the growing interest in greenhouse gas reduction, the effect of greenhouse gas energy reduction from implementing green buildings is gaining attention. The government of the Republic of Korea has set green growth as its paradigm for national development, and there is a growing interest in energy saving for green buildings. However, green buildings may have financial barriers that have high initial construction costs and uncertainties about future project value. Under the circumstances, governmental support to attract private funding is necessary to implement green building projects. The objective of this study is to suggest a financing model for facilitating green building projects with a governmental guarantee based on Certified Emission Reduction (CER). In this model, the government provides a guarantee for the increased costs of a green building project in return for CER. And this study presents the validation of the model as well as feasibility for implementing green building project. In addition, the suggested model assumed governmental guarantees for the increased cost, but private guarantees seem to be feasible as well because of the promising value of the guarantee from CER. To do this, certification of Clean Development Mechanisms (CDMs) for green buildings must be obtained. PMID:24376379

  9. A Model Suggestion to Predict Leverage Ratio for Construction Projects

    Directory of Open Access Journals (Sweden)

    Özlem Tüz

    2013-12-01

    Full Text Available Due to the nature, construction is an industry with high uncertainty and risk. Construction industry carries high leverage ratios. Firms with low equities work in big projects through progress payment system, but in this case, even a small negative in the planned cash flows constitute a major risk for the company.The use of leverage, with a small investment to achieve profit targets large-scale, high-profit, but also brings a high risk with it. Investors may lose all or the portion of the money. In this study, monitoring and measuring of the leverage ratio because of the displacement in cash inflows of construction projects which uses high leverage and low cash to do business in the sector is targeted. Cash need because of drifting the cash inflows may be seen due to the model. Work should be done in the early stages of the project with little capital but in the later stages, rapidly growing capital need arises.The values obtained from the model may be used to supply the capital held in the right time by anticipating the risks because of the delay in cashflow of construction projects which uses high leverage ratio.

  10. Divergent projections of future land use in the United States arising from different models and scenarios

    Science.gov (United States)

    Sohl, Terry L.; Wimberly, Michael; Radeloff, Volker C.; Theobald, David M.; Sleeter, Benjamin M.

    2016-01-01

    A variety of land-use and land-cover (LULC) models operating at scales from local to global have been developed in recent years, including a number of models that provide spatially explicit, multi-class LULC projections for the conterminous United States. This diversity of modeling approaches raises the question: how consistent are their projections of future land use? We compared projections from six LULC modeling applications for the United States and assessed quantitative, spatial, and conceptual inconsistencies. Each set of projections provided multiple scenarios covering a period from roughly 2000 to 2050. Given the unique spatial, thematic, and temporal characteristics of each set of projections, individual projections were aggregated to a common set of basic, generalized LULC classes (i.e., cropland, pasture, forest, range, and urban) and summarized at the county level across the conterminous United States. We found very little agreement in projected future LULC trends and patterns among the different models. Variability among scenarios for a given model was generally lower than variability among different models, in terms of both trends in the amounts of basic LULC classes and their projected spatial patterns. Even when different models assessed the same purported scenario, model projections varied substantially. Projections of agricultural trends were often far above the maximum historical amounts, raising concerns about the realism of the projections. Comparisons among models were hindered by major discrepancies in categorical definitions, and suggest a need for standardization of historical LULC data sources. To capture a broader range of uncertainties, ensemble modeling approaches are also recommended. However, the vast inconsistencies among LULC models raise questions about the theoretical and conceptual underpinnings of current modeling approaches. Given the substantial effects that land-use change can have on ecological and societal processes, there

  11. The UK Earth System Model project

    Science.gov (United States)

    Tang, Yongming

    2016-04-01

    In this talk we will describe the development and current status of the UK Earth System Model (UKESM). This project is a NERC/Met Office collaboration and has two objectives; to develop and apply a world-leading Earth System Model, and to grow a community of UK Earth System Model scientists. We are building numerical models that include all the key components of the global climate system, and contain the important process interactions between global biogeochemistry, atmospheric chemistry and the physical climate system. UKESM will be used to make key CMIP6 simulations as well as long-time (e.g. millennium) simulations, large ensemble experiments and investigating a range of future carbon emission scenarios.

  12. Sustainable model for financial viability of decentralized biomass gasifier based power projects

    International Nuclear Information System (INIS)

    Palit, Debajit; Malhotra, Ramit; Kumar, Atul

    2011-01-01

    This paper made a modest attempt for designing a sustainable model for financial viability of biomass gasifier power projects for enhancing electricity access in India and other developing countries. For long term sustainability of distributed generation projects in remote rural areas, viability from both project implementing agency (PIA) and the end-users need to be ensured. The minimum required prices of electricity from both PIA and end-user perspective have been estimated. While for PIA the cost recovery is the key for viability, the affordability to pay the electricity cost is crucial for the end users. Analysis carried out in this paper on the basis of data obtained from operational projects implemented in India reveal that it is essential to operate the system at a higher capacity utilization factor. While this can be achieved though creating convergence with locally relevant economic activity, it is also observed that micro-enterprises cannot pay beyond a certain price of electricity to keep it sustainable. This paper sets forth a case for developing a regulatory mechanism to extend the tariff fixation for the projects and providing cross-subsidies to ensure long term sustainability of off-grid project. - Highlights: → We design sustainable financial model for viability of biomass gasifier projects. → Analysis based on field data obtained from operational projects in India. Estimated electricity pricing from both implementing agency and end-users perspective. → A regulatory mechanism for tariff fixation and cross subsidization is recommended.

  13. Decision Model on Financing a Project Using Knowledge about Risk Areas

    OpenAIRE

    Ioana POPOVICI; Emil SCARLAT; Francesco RIZZO

    2011-01-01

    The research presents an alternative to the classical method of measuring financial risk in funding a project. The goal of the model described in the paper implies identifying "risky areas" within the financial balance of the project. The model analysis the financial risk behavior studied along four scenarios by varying only the cost of financing source used according to the specific type of funding. The model introduces the time factor into the analysis of financial risk due to the specific ...

  14. The international hydrocoin project

    International Nuclear Information System (INIS)

    1987-01-01

    The International HYDROCOIN (Hydrologic Code Intercomparison) Project was started in May 1984. Fourteen organizations participate in the Project, with the Swedish Nuclear Power Inspectorate (SKI) as managing participant and the OECD Nuclear Energy Agency (NEA) taking part as a member of the Project secretariat. HYDROCOIN is concerned with the assessment of groundwater movements at potential nuclear waste disposal sites with the help of mathematical models and computer codes. The Project is divided into three levels. The objective of HYDROCOIN Level 1 is to verify the accuracy of groundwater flow codes. HYDROCOIN Level 2 and Level 3 are concerned with validation of hydrological models and uncertainty/sensitivity analysis, respectively. This report, which has been prepared by the NEA Secretariat and SKI in consultation with the co-ordinating group of the HYDROCOIN Project summarizes the background and objectives of the Project and presents the results of the work performed up to the middle of 1987. It is intended to provide general information on HYDROCOIN to interested parties beyond the group of directly involved specialists

  15. Management of research and development project

    International Nuclear Information System (INIS)

    Go, Seok Hwa; Hong Jeong Yu; Hyun, Byeong Hwan

    2010-12-01

    This book introduces summary on management of research and development project, prepare of research and development with investigation and analysis of paper, patent and trend of technology, structure of project, management model, management of project, management of project range, management of project time, management of project cost, management of project goods, management of project manpower, management of communication, management of project risk, management of project supply, management of outcome of R and D, management of apply and enroll of patent and management of technology transfer.

  16. MODELS OF PROJECT REVERSE ENGINEERING

    Directory of Open Access Journals (Sweden)

    Віктор Володимирович ІВАНОВ

    2017-03-01

    Full Text Available Reverse engineering decided important scientific and technical problems of increasing the cost of the existing technical product by transforming it into a product with other features or design. Search ideas of the new application of existing products on the base of heuristic analysis were created. The concept of reverse engineering and its division into three types: conceptual, aggregate and complete was expanded. The use of heuristic methods for reverse engineering concept was showed. The modification model of Reverse engineering based on the model of РМВОК was developed. Our model includes two new phases: identification and transformation. At the identification phase, technical control is made. At the transformation phase, search heuristic idea of the new applied existing technical product was made. The model of execution phase that included heuristic methods, metrological equipment, and CAD/CAM/CAE program complex was created. The model that connected economic indicators of reverse engineering project was developed.

  17. The New Mexico Technology Deployment Pilot Project: A technology reinvestment project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The New Mexico Technology Deployment Project (NMTDP) has been in operation for slightly more than two years. As one of the original TRP projects, NMTDP had the charter to develop and validate a new model for technology extraction which emphasized focused technology collaboration, early industry involvement, and a strong dual use commercialization and productization emphasis. Taken in total, the first two years of the NMTDP have been exceptionally successful, surpassing the goals of the project. This report describes the accomplishments and evolution of the NMTDP to date and discusses the future potential of the project. Despite the end of federal funding, and a subsequent reduction in level of effort, the project partners are committed to continuation of the project.

  18. Compilation Of An Econometric Human Resource Efficiency Model For Project Management Best Practices

    OpenAIRE

    G. van Zyl; P. Venier

    2006-01-01

    The aim of the paper is to introduce a human resource efficiency model in order to rank the most important human resource driving forces for project management best practices. The results of the model will demonstrate how the human resource component of project management acts as the primary function to enhance organizational performance, codified through improved logical end-state programmes, work ethics and process contributions. Given the hypothesis that project management best practices i...

  19. Ambidextrous Leadership and Sustainability-Based Project Performance: The Role of Project Culture

    Directory of Open Access Journals (Sweden)

    Junwei Zheng

    2017-12-01

    Full Text Available Most studies in the project management field emphasized the effects of leaders or managers, but these effects have rarely been examined at the project level. To cover this research gap, this study applies organizational ambidexterity theory to examine the effects among ambidextrous leadership, ambidextrous culture and sustainability-based project performance. Using a valid sample of 217 project leaders and members from Chinese construction projects, the method of multiple linear regression was adopted to assess the direct relationship among ambidextrous leadership, ambidextrous culture and project performance. Moreover, the bootstrapping technique through structural equation modeling, has been used to analyze the mediating effect of ambidextrous culture. Additionally, the sample data was divided into different groups according to the median value of the variables to conduct the ANOVA and to assess the within-group differences. The results indicated a positive and direct relationship that ambidextrous leadership has on project performance and ambidextrous culture. In addition, there was also a mediating impact of ambidextrous leadership on project performance via ambidextrous culture. Thus, ambidextrous leadership combined with transformational leadership as well as transactional leadership likely has a stronger positive impact on project performance through fostering the adaptive culture and consistent culture. Our findings contribute to an in-depth understanding of the role of the leader and culture for project outcomes. The project-based organization in construction projects could train project leaders’ ambidextrous leadership behavior to facilitate the formation of an ambidextrous culture and to increase project performance. Moreover, this study enriches the existing literature on leadership and project management by highlighting the important path of ambidextrous leadership and ambidextrous culture on the performance at the project level

  20. Projective relativity, cosmology and gravitation

    International Nuclear Information System (INIS)

    Arcidiacono, G.

    1986-01-01

    This book describes the latest applications of projective geometry to cosmology and gravitation. The contents of the book are; the Poincare group and Special Relativity, the thermodynamics and electromagnetism, general relativity, gravitation and cosmology, group theory and models of universe, the special projective relativity, the Fantappie group and Big-Bang cosmology, a new cosmological projective mechanics, the plasma physics and cosmology, the projective magnetohydrodynamics field, projective relativity and waves propagation, the generalizations of the gravitational field, the general projective relativity, the projective gravitational field, the De Sitter Universe and quantum physics, the conformal relativity and Newton gravitation

  1. On reducibility and ergodicity of population projection matrix models

    DEFF Research Database (Denmark)

    Stott, Iain; Townley, Stuart; Carslake, David

    2010-01-01

    from all stages to all other stages) and therefore ergodic (whatever initial stage structure is used in the population projection, it will always exhibit the same stable asymptotic growth rate). 2. Evaluation of 652 PPM models for 171 species from the literature suggests that 24·7% of PPM models...... structure used in the population projection). In our sample of published PPMs, 15·6% are non-ergodic. 3. This presents a problem: reducible–ergodic models often defy biological rationale in their description of the life cycle but may or may not prove problematic for analysis as they often behave similarly...... of reducibility in published PPMs, with significant implications for the predictive power of such models in many cases. We suggest that as a general rule, reducibility of PPM models should be avoided. However, we provide a guide to the pertinent analysis of reducible matrix models, largely based upon whether...

  2. Model projections of atmospheric steering of Sandy-like superstorms.

    Science.gov (United States)

    Barnes, Elizabeth A; Polvani, Lorenzo M; Sobel, Adam H

    2013-09-17

    Superstorm Sandy ravaged the eastern seaboard of the United States, costing a great number of lives and billions of dollars in damage. Whether events like Sandy will become more frequent as anthropogenic greenhouse gases continue to increase remains an open and complex question. Here we consider whether the persistent large-scale atmospheric patterns that steered Sandy onto the coast will become more frequent in the coming decades. Using the Coupled Model Intercomparison Project, phase 5 multimodel ensemble, we demonstrate that climate models consistently project a decrease in the frequency and persistence of the westward flow that led to Sandy's unprecedented track, implying that future atmospheric conditions are less likely than at present to propel storms westward into the coast.

  3. How to Gain Value from a Project Management Model: Case Study

    DEFF Research Database (Denmark)

    Riis, Eva; Eskerod, Pernille

    2010-01-01

      Recent research has shown that PM models can be a powerful creator of value for companies. This paper extends this research aiming at gaining a deeper understanding of the preconditions that must exist for harvesting the values of a common frame of reference for project management. It reports...... findings from in-depth investigations in a Danish industrial concern that considers its PM model as the core of its project activities.  ...

  4. The EV Project Price/Fee Models for Publicly Accessible Charging

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, James Edward [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-12-01

    As plug-in electric vehicles (PEVs) are introduced to the market place and gain more consumer acceptance, it is important for a robust and self-sustaining non-residential infrastructure of electric vehicle supply equipment (EVSE) to be established to meet the needs of PEV drivers. While federal and state financial incentives for electric vehicles were in place and remain so today, future incentives are uncertain. In order for PEVs to achieve mainstream adoption, an adequate and sustainable commercial or publicly available charging infrastructure was pursued by The EV Project to encourage increased PEV purchases by alleviating range anxiety, and by removing adoption barriers for consumers without a dedicated overnight parking location to provide a home-base charger. This included determining a business model for publicly accessible charge infrastructure. To establish this business model, The EV Project team created a fee for charge model along with various ancillary offerings related to charging that would generate revenue. And after placing chargers in the field the Project rolled out this fee structure.

  5. Climatic Models Ensemble-based Mid-21st Century Runoff Projections: A Bayesian Framework

    Science.gov (United States)

    Achieng, K. O.; Zhu, J.

    2017-12-01

    There are a number of North American Regional Climate Change Assessment Program (NARCCAP) climatic models that have been used to project surface runoff in the mid-21st century. Statistical model selection techniques are often used to select the model that best fits data. However, model selection techniques often lead to different conclusions. In this study, ten models are averaged in Bayesian paradigm to project runoff. Bayesian Model Averaging (BMA) is used to project and identify effect of model uncertainty on future runoff projections. Baseflow separation - a two-digital filter which is also called Eckhardt filter - is used to separate USGS streamflow (total runoff) into two components: baseflow and surface runoff. We use this surface runoff as the a priori runoff when conducting BMA of runoff simulated from the ten RCM models. The primary objective of this study is to evaluate how well RCM multi-model ensembles simulate surface runoff, in a Bayesian framework. Specifically, we investigate and discuss the following questions: How well do ten RCM models ensemble jointly simulate surface runoff by averaging over all the models using BMA, given a priori surface runoff? What are the effects of model uncertainty on surface runoff simulation?

  6. A mathematical model for crashing projects by considering time, cost, quality and risk

    Directory of Open Access Journals (Sweden)

    Amin Mahmoudi

    2017-01-01

    Full Text Available Employers are looking for reducing execution time and maintaining the quality of the projects that are the main objective of the projects. In this article, we focus on crashing projects by con-sidering different factors such as cost, time, quality and risk. For the proposed integer linear model, cost of conformance and cost of non-conformance are considered as parts of the costs of quality of deliverables in projects. The cost of conformance consists of the costs of training the project team, inspection and test of deliverables. The cost of non-conformance also includes costs of rework and scrap. Project risk management is one of the important aspects of the pro-jects. The present study also considers the impact of risks, which is highly applicable in projects with a high level of uncertainty. Results are presented using integer programming approach with the aim of minimizing the costs of the project.

  7. Improving Climate Projections Using "Intelligent" Ensembles

    Science.gov (United States)

    Baker, Noel C.; Taylor, Patrick C.

    2015-01-01

    Recent changes in the climate system have led to growing concern, especially in communities which are highly vulnerable to resource shortages and weather extremes. There is an urgent need for better climate information to develop solutions and strategies for adapting to a changing climate. Climate models provide excellent tools for studying the current state of climate and making future projections. However, these models are subject to biases created by structural uncertainties. Performance metrics-or the systematic determination of model biases-succinctly quantify aspects of climate model behavior. Efforts to standardize climate model experiments and collect simulation data-such as the Coupled Model Intercomparison Project (CMIP)-provide the means to directly compare and assess model performance. Performance metrics have been used to show that some models reproduce present-day climate better than others. Simulation data from multiple models are often used to add value to projections by creating a consensus projection from the model ensemble, in which each model is given an equal weight. It has been shown that the ensemble mean generally outperforms any single model. It is possible to use unequal weights to produce ensemble means, in which models are weighted based on performance (called "intelligent" ensembles). Can performance metrics be used to improve climate projections? Previous work introduced a framework for comparing the utility of model performance metrics, showing that the best metrics are related to the variance of top-of-atmosphere outgoing longwave radiation. These metrics improve present-day climate simulations of Earth's energy budget using the "intelligent" ensemble method. The current project identifies several approaches for testing whether performance metrics can be applied to future simulations to create "intelligent" ensemble-mean climate projections. It is shown that certain performance metrics test key climate processes in the models, and

  8. Severe fuel damage projects

    International Nuclear Information System (INIS)

    Sdouz, G.

    1987-10-01

    After the descriptions of the generation of a Severe Fuel Damage Accident in a LWR the hypothetical course of such an accident is explained. Then the most significant projects are described. At each project the experimental facility, the most important results and the concluding models and codes are discussed. The selection of the projects is concentrated on the German Projekt Nukleare Sicherheit (PNS), tests performed at the Idaho National Engineering Laboratory (INEL) and smaller projects in France and Great Britain. 25 refs., 26 figs. (Author)

  9. MODELS AND METHODS OF SAFETY-ORIENTED PROJECT MANAGEMENT OF DEVELOPMENT OF COMPLEX SYSTEMS: METHODOLOGICAL APPROACH

    Directory of Open Access Journals (Sweden)

    Олег Богданович ЗАЧКО

    2016-03-01

    Full Text Available The methods and models of safety-oriented project management of the development of complex systems are proposed resulting from the convergence of existing approaches in project management in contrast to the mechanism of value-oriented management. A cognitive model of safety oriented project management of the development of complex systems is developed, which provides a synergistic effect that is to move the system from the original (pre condition in an optimal one from the viewpoint of life safety - post-project state. The approach of assessment the project complexity is proposed, which consists in taking into account the seasonal component of a time characteristic of life cycles of complex organizational and technical systems with occupancy. This enabled to take into account the seasonal component in simulation models of life cycle of the product operation in complex organizational and technical system, modeling the critical points of operation of systems with occupancy, which forms a new methodology for safety-oriented management of projects, programs and portfolios of projects with the formalization of the elements of complexity.

  10. Project as a System and its Management

    Directory of Open Access Journals (Sweden)

    Jiří Skalický

    2017-06-01

    Full Text Available The contribution aims to describe project as a system, to define project control goal and strategy, control variables and their relationships. Three common control variables represented by the project triangle, are extended by two other important variables – project risk and quality. The control system consists of two components: social one – project manager and project team – and technical one – project dynamic simulation model as a decision making support of project manager in project milestones. In the project planning phase, the project baseline with planned controlled variables is created. In milestones after project launch, the actual values of these variables are measured. If the actual values deviate from planned ones, corrective actions are proposed and new baseline for the following control interval is created. Project plan takes into account the actual project progress and optimum corrective actions are determined by simulation, respecting control strategy and availability of resources. The contribution presents list of references to articles dealing with project as a system and its simulation. In most cases, they refer to the project control using the Earned Value Management method and its derivatives. Using of the dynamic simulation model for project monitoring and control, suggested in this contribution, presents a novel approach. The proposed model can serve as departure point to future research of authors and for development of appropriate and applicable tool.

  11. Modelling Project Feasibility Robustness by Use of Scenarios

    DEFF Research Database (Denmark)

    Moshøj, Claus Rehfeld; Leleur, Steen

    1998-01-01

    , SEAM secures a consistent inclusion of actual scenario elements in the quantitative impact modelling and facilitates a transparent project feasibility robustness analysis. SEAM is implemented as part of a decision support system with a toolbox structure applicable to different types of transport...

  12. Radarsat Antarctic Mapping Project Digital Elevation Model, Version 2

    Data.gov (United States)

    National Aeronautics and Space Administration — The high-resolution Radarsat Antarctic Mapping Project (RAMP) Digital Elevation Model (DEM) combines topographic data from a variety of sources to provide consistent...

  13. CRAUDFUNDING AS A PERSPECTIVE MODEL OF FINANCING BUSINESS IDEAS AND PROJECTS

    OpenAIRE

    Vyacheslav Riznyk; Nadiya Riznyk

    2018-01-01

    The subject of research is crowdfunding as an alternative model of attracting financing for the implementation business ideas and projects based on the use of crowdfunding Internet platforms. The purpose of the article is to clarify the possibilities of crowdfunding as a new financial instrument and a promising source of funding. The aim of the article is to consider crowdfunding as an alternative model for financing author's business ideas and projects, to analyze the main types and mo...

  14. Integrated Medical Model (IMM) Project Verification, Validation, and Credibility (VVandC)

    Science.gov (United States)

    Walton, M.; Boley, L.; Keenan, L.; Kerstman, E.; Shah, R.; Young, M.; Saile, L.; Garcia, Y.; Meyers, J.; Reyes, D.

    2015-01-01

    The Integrated Medical Model (IMM) Project supports end user requests by employing the Integrated Medical Evidence Database (iMED) and IMM tools as well as subject matter expertise within the Project. The iMED houses data used by the IMM. The IMM is designed to forecast relative changes for a specified set of crew health and mission success risk metrics by using a probabilistic model based on historical data, cohort data, and subject matter expert opinion. A stochastic approach is taken because deterministic results would not appropriately reflect the uncertainty in the IMM inputs. Once the IMM was conceptualized, a plan was needed to rigorously assess input information, framework and code, and output results of the IMM, and ensure that end user requests and requirements were considered during all stages of model development and implementation, as well as lay the foundation for external review and application. METHODS: In 2008, the Project team developed a comprehensive verification and validation (VV) plan, which specified internal and external review criteria encompassing 1) verification of data and IMM structure to ensure proper implementation of the IMM, 2) several validation techniques to confirm that the simulation capability of the IMM appropriately represents occurrences and consequences of medical conditions during space missions, and 3) credibility processes to develop user confidence in the information derived from the IMM. When the NASA-STD-7009 (7009) [1] was published, the Project team updated their verification, validation, and credibility (VVC) project plan to meet 7009 requirements and include 7009 tools in reporting VVC status of the IMM. Construction of these tools included meeting documentation and evidence requirements sufficient to meet external review success criteria. RESULTS: IMM Project VVC updates are compiled recurrently and include updates to the 7009 Compliance and Credibility matrices. Reporting tools have evolved over the lifetime of

  15. Projection model for flame chemiluminescence tomography based on lens imaging

    Science.gov (United States)

    Wan, Minggang; Zhuang, Jihui

    2018-04-01

    For flame chemiluminescence tomography (FCT) based on lens imaging, the projection model is essential because it formulates the mathematical relation between the flame projections captured by cameras and the chemiluminescence field, and, through this relation, the field is reconstructed. This work proposed the blurry-spot (BS) model, which takes more universal assumptions and has higher accuracy than the widely applied line-of-sight model. By combining the geometrical camera model and the thin-lens equation, the BS model takes into account perspective effect of the camera lens; by combining ray-tracing technique and Monte Carlo simulation, it also considers inhomogeneous distribution of captured radiance on the image plane. Performance of these two models in FCT was numerically compared, and results showed that using the BS model could lead to better reconstruction quality in wider application ranges.

  16. MakerBot projects blueprints

    CERN Document Server

    Larson, Joseph

    2013-01-01

    MakerBot Projects Blueprints is a project-based book, with each chapter taking you through the creation of an awesome stand-alone project. MakerBot Project Blueprints is for anyone with an interest in the 3D printing revolution and the slightest bit of computer skills. Whether you own a 3D printer or not you can design for them. All it takes is Blender, a free 3D modeling tool, this book and a little creativity and someday you'll be able to hold something you designed in the computer in your hands.

  17. Source term modelling parameters for Project-90

    International Nuclear Information System (INIS)

    Shaw, W.; Smith, G.; Worgan, K.; Hodgkinson, D.; Andersson, K.

    1992-04-01

    This document summarises the input parameters for the source term modelling within Project-90. In the first place, the parameters relate to the CALIBRE near-field code which was developed for the Swedish Nuclear Power Inspectorate's (SKI) Project-90 reference repository safety assessment exercise. An attempt has been made to give best estimate values and, where appropriate, a range which is related to variations around base cases. It should be noted that the data sets contain amendments to those considered by KBS-3. In particular, a completely new set of inventory data has been incorporated. The information given here does not constitute a complete set of parameter values for all parts of the CALIBRE code. Rather, it gives the key parameter values which are used in the constituent models within CALIBRE and the associated studies. For example, the inventory data acts as an input to the calculation of the oxidant production rates, which influence the generation of a redox front. The same data is also an initial value data set for the radionuclide migration component of CALIBRE. Similarly, the geometrical parameters of the near-field are common to both sub-models. The principal common parameters are gathered here for ease of reference and avoidance of unnecessary duplication and transcription errors. (au)

  18. MODELLING OF FINANCIAL EFFECTIVENESS AND COMPARATIVE ANALYSIS OF PUBLIC-PRIVATE PARTNERSHIP PROJECTS AND PUBLIC PROCUREMENT

    Directory of Open Access Journals (Sweden)

    Kuznetsov Aleksey Alekseevich

    2017-10-01

    Full Text Available The article substantiates the necessity of extension and development of tools for methodological evaluation of effectiveness of public-private partnership (PPP projects both individually and in comparison of effectiveness of various mechanisms of projects realization on the example of traditional public procurement. The author proposed an original technique of modelling cash flows of private and public partners when realizing the projects based on PPP and on public procurement. The model enables us promptly and with sufficient accuracy to reveal comparative advantages of project forms of PPP and public procurement, and also assess financial effectiveness of the PPP projects for each partner. The modelling is relatively straightforward and reliable. The model also enables us to evaluate public partner's expenses for availability, find the terms and thresholds for interest rates of financing attracted by the partners and for risk probabilities to ensure comparative advantage of PPP project. Proposed criteria of effectiveness are compared with methodological recommendations provided by the Ministry of Economic Development of the Russian Federation. Subject: public and private organizations, financial institutions, development institutions and their theoretical and practical techniques for effectiveness evaluation of public-private partnership (PPP projects. Complexity of effectiveness evaluation and the lack of unified and accepted methodology are among the factors that limit the development of PPP in the Russian Federation nowadays. Research objectives: development of methodological methods for assessing financial efficiency of PPP projects by creating and justifying application of new principles and methods of modelling, and also criteria for effectiveness of PPP projects both individually and in comparison with the public procurement. Materials and methods: open database of ongoing PPP projects in the Russian Federation and abroad was used. The

  19. W-320 Project thermal modeling

    Energy Technology Data Exchange (ETDEWEB)

    Sathyanarayana, K., Fluor Daniel Hanford

    1997-03-18

    This report summarizes the results of thermal analysis performed to provide a technical basis in support of Project W-320 to retrieve by sluicing the sludge in Tank 241-C-106 and to transfer into Tank 241-AY-102. Prior theraml evaluations in support of Project W-320 safety analysis assumed the availability of 2000 to 3000 CFM, as provided by Tank Farm Operations, for tank floor cooling channels from the secondary ventilation system. As this flow availability has no technical basis, a detailed Tank 241-AY-102 secondary ventilation and floor coating channel flow model was developed and analysis was performed. The results of the analysis show that only about 150 cfm flow is in floor cooLing channels. Tank 241-AY-102 thermal evaluation was performed to determine the necessary cooling flow for floor cooling channels using W-030 primary ventilation system for different quantities of Tank 241-C-106 sludge transfer into Tank 241-AY-102. These sludge transfers meet different options for the project along with minimum required modification of the ventilation system. Also the results of analysis for the amount of sludge transfer using the current system is presented. The effect of sludge fluffing factor, heat generation rate and its distribution between supernatant and sludge in Tank 241-AY-102 on the amount of sludge transfer from Tank 241-C-106 were evaluated and the results are discussed. Also transient thermal analysis was performed to estimate the time to reach the steady state. For a 2 feet sludge transfer, about 3 months time will be requirad to reach steady state. Therefore, for the purpose of process control, a detailed transient thermal analysis using GOTH Computer Code will be required to determine transient response of the sludge in Tank 241-AY-102. Process control considerations are also discussed to eliminate the potential for a steam bump during retrieval and storage in Tanks 241-C-106 and 241-AY-102 respectively.

  20. The Copenhagen Traffic Model and its Application in the Metro City Ring Project

    DEFF Research Database (Denmark)

    Vuk, Goran; Overgård, Christian Hansen; Fox, J.

    2009-01-01

    In June 2007, the Danish Parliament passed an act to finance the construction of the Metro City Ring in Copenhagen. The assessment project is based on the passenger patronage forecasts for 2015 from the Copenhagen traffic model. In this paper we show how the model forecasts for this particular...... infrastructure project can be explained through detailed knowledge of model structure and model validation....

  1. Regional climate projections for the MENA-CORDEX domain: analysis of projected temperature and precipitation changes

    Science.gov (United States)

    Hänsler, Andreas; Weber, Torsten; Eggert, Bastian; Saeed, Fahad; Jacob, Daniela

    2014-05-01

    Within the CORDEX initiative a multi-model suite of regionalized climate change information will be made available for several regions of the world. The German Climate Service Center (CSC) is taking part in this initiative by applying the regional climate model REMO to downscale global climate projections of different coupled general circulation models (GCMs) for several CORDEX domains. Also for the MENA-CORDEX domain, a set of regional climate change projections has been established at the CSC by downscaling CMIP5 projections of the Max-Planck-Institute Earth System Model (MPI-ESM) for the scenarios RCP4.5 and RCP8.5 with the regional model REMO for the time period from 1950 to 2100 to a horizontal resolution of 0.44 degree. In this study we investigate projected changes in future climate conditions over the domain towards the end of the 21st century. Focus in the analysis is given to projected changes in the temperature and rainfall characteristics and their differences for the two scenarios will be highlighted.

  2. The EGS Collab Project: Stimulation Investigations for Geothermal Modeling Analysis and Validation

    Science.gov (United States)

    Blankenship, D.; Kneafsey, T. J.

    2017-12-01

    The US DOE's EGS Collab project team is establishing a suite of intermediate-scale ( 10-20 m) field test beds for coupled stimulation and interwell flow tests. The multiple national laboratory and university team is designing the tests to compare measured data to models to improve measurement and modeling toolsets available for use in field sites and investigations such as DOE's Frontier Observatory for Research in Geothermal Energy (FORGE) Project. Our tests will be well-controlled, in situexperiments focused on rock fracture behavior, seismicity, and permeability enhancement. Pre- and post-test modeling will allow for model prediction and validation. High-quality, high-resolution geophysical and other fracture characterization data will be collected, analyzed, and compared with models and field observations to further elucidate the basic relationships between stress, induced seismicity, and permeability enhancement. Coring through the stimulated zone after tests will provide fracture characteristics that can be compared to monitoring data and model predictions. We will also observe and quantify other key governing parameters that impact permeability, and attempt to understand how these parameters might change throughout the development and operation of an Enhanced Geothermal System (EGS) project with the goal of enabling commercial viability of EGS. The Collab team will perform three major experiments over the three-year project duration. Experiment 1, intended to investigate hydraulic fracturing, will be performed in the Sanford Underground Research Facility (SURF) at 4,850 feet depth and will build on kISMET Project findings. Experiment 2 will be designed to investigate hydroshearing. Experiment 3 will investigate changes in fracturing strategies and will be further specified as the project proceeds. The tests will provide quantitative insights into the nature of stimulation (e.g., hydraulic fracturing, hydroshearing, mixed-mode fracturing, thermal fracturing

  3. An alternative projection model of future nuclear capacity

    International Nuclear Information System (INIS)

    Takei, Mitsuo

    1985-01-01

    There is generally a high degree of uncertainty involved in the projection of growth of any energy source, especially when the projection extends 50 years ahead. The 1982 OECD/NEA Report, 'Nuclear Energy and its Fuel Cycle Prospect to 2025' notes the downturn in past projections of nuclear capacity over the past decade. It is obvious that rapidly changing conditions have affected overall worldwide energy and economic growth and the field of nuclear power has been subject to changes specific to itself. These have caused past projections to become obsolete and therefore it would seem necessary to implement a new projection method to improve the accuracy of present forecasting. (author)

  4. Application of Markovian model to school enrolment projection ...

    African Journals Online (AJOL)

    Application of Markovian model to school enrolment projection process. VU Ekhosuehi, AA Osagiede. Abstract. No Abstract. Global Journal of Mathematical Sciences Vol. 5(1) 2006: 9-16. Full Text: EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT.

  5. From project management to project leadership

    NARCIS (Netherlands)

    Braun, F.; Avital, M.

    2010-01-01

    It is virtually a truism that good leadership practices can help project managers with attaining the desired project outcome. However, a better understanding of which leadership practices enable project managers to be more effective warrants further investigation. Subsequently, in this study, we

  6. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  7. The accuracy of matrix population model projections for coniferous trees in the Sierra Nevada, California

    Science.gov (United States)

    van Mantgem, P.J.; Stephenson, N.L.

    2005-01-01

    1 We assess the use of simple, size-based matrix population models for projecting population trends for six coniferous tree species in the Sierra Nevada, California. We used demographic data from 16 673 trees in 15 permanent plots to create 17 separate time-invariant, density-independent population projection models, and determined differences between trends projected from initial surveys with a 5-year interval and observed data during two subsequent 5-year time steps. 2 We detected departures from the assumptions of the matrix modelling approach in terms of strong growth autocorrelations. We also found evidence of observation errors for measurements of tree growth and, to a more limited degree, recruitment. Loglinear analysis provided evidence of significant temporal variation in demographic rates for only two of the 17 populations. 3 Total population sizes were strongly predicted by model projections, although population dynamics were dominated by carryover from the previous 5-year time step (i.e. there were few cases of recruitment or death). Fractional changes to overall population sizes were less well predicted. Compared with a null model and a simple demographic model lacking size structure, matrix model projections were better able to predict total population sizes, although the differences were not statistically significant. Matrix model projections were also able to predict short-term rates of survival, growth and recruitment. Mortality frequencies were not well predicted. 4 Our results suggest that simple size-structured models can accurately project future short-term changes for some tree populations. However, not all populations were well predicted and these simple models would probably become more inaccurate over longer projection intervals. The predictive ability of these models would also be limited by disturbance or other events that destabilize demographic rates. ?? 2005 British Ecological Society.

  8. Experience of Hungarian model project: 'Strengthening training for operational safety at Paks NPP'

    International Nuclear Information System (INIS)

    Kiss, I.

    1998-01-01

    Training of Operational Safety at Paks NPP is described including all the features of the project including namely: description of Paks NPP, its properties and performances; reasons for establishing Hungarian Model Project, its main goals, mentioning Hungarian and IAEA experts involved in the Project, its organization, operation, budget, current status together with its short term and long term impact

  9. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  10. A decision model for E and P petroleum projects using real options and preference theory

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Gabriel A.C. [Universidade Estadual de Campinas, SP (Brazil). Inst. de Geociencias. Lab. de Analise Geoconomica (LAGE); Suslick, Saul B. [Universidade Estadual de Campinas, SP (Brazil). Inst. de Geociencias. Centro de Estudo do Petroleo; Nepomuceno Filho, Francisco [PETROBRAS, Rio de Janeiro, RJ (Brazil)

    2004-07-01

    The results from Discounted Cash Flow (DCF) are limited as a tool for decision-making in the petroleum industry because they do not properly take into account three important features of the modern investments: uncertainty, irreversibility, timing and corporation's risk-aversion. Recent developments in real options and preference theories have allowed decision-makers to employ these two approaches separately in the process of valuation and decision-making of risky projects. This paper presents a model for valuation and decision-making integrating discounted cash flow, real options and reference theory. This model seems to be suitable to answer to the following questions: what is the current value of an oil project? what is the optimal working interest in this project venture?; what is criteria to select projects considering investment irreversibility, uncertainty and timing to implement decisions? This model is applied to valuation and decision-making of a project to produce oil from a deep-water reservoir and its results are compared to those of the traditional approach. NPV model suggest that, as the project value is above its investment cost, the corporation should invest immediately and take 100% working interest in the project. Contrarily, the integrated model suggest the corporation should invest as long as project current value is as large as 1.85 times investment cost and should take only 44.38% working interest, whereas partners fund and acquire the remaining 55,62% of the project. In general, results indicate that NPV tend to pay more attention on return and does not account properly for risk. Then, as the uncertainty or volatile of strategic variables increases, the two models give more divergent results. (author)

  11. A conceptual model of psychological contracts in construction projects

    Directory of Open Access Journals (Sweden)

    Yongjian Ke

    2016-09-01

    Full Text Available The strategic importance of relationship style contracting is recognised in the construction industry. Both public and private sector clients are stipulating more integrated and collaborative forms of procurement. Despite relationship and integrated contractual arrangement being available for some time, it is clear that construction firms have been slow to adopt them. Hence it is timely to examine how social exchanges, via unwritten agreement and behaviours, are being nurtured in construction projects. This paper adopted the concept of Psychological Contracts (PC to describe unwritten agreement and behaviours. A conceptual model of the PC is developed and validated using the results from a questionnaire survey administered to construction professionals in Australia. The results uncovered the relationships that existed amongst relational conditions and relational benefits, the PC and the partners’ satisfaction. The results show that all the hypotheses in the conceptual model of the PC are supported, suggesting the PC model is important and may have an effect on project performance and relationship quality among contracting parties. A validated model of the PC in construction was then developed based on the correlations among each component. The managerial implications are that past relationships and relationship characteristics should be taken into account in the selection of procurement partners and the promise of future resources, support and tangible relational outcomes are also vital. It is important for contracting parties to pay attention to unwritten agreements (the PC and behaviours when managing construction projects.

  12. Measurement Rounding Errors in an Assessment Model of Project Led Engineering Education

    Directory of Open Access Journals (Sweden)

    Francisco Moreira

    2009-11-01

    Full Text Available This paper analyzes the rounding errors that occur in the assessment of an interdisciplinary Project-Led Education (PLE process implemented in the Integrated Master degree on Industrial Management and Engineering (IME at University of Minho. PLE is an innovative educational methodology which makes use of active learning, promoting higher levels of motivation and students’ autonomy. The assessment model is based on multiple evaluation components with different weights. Each component can be evaluated by several teachers involved in different Project Supporting Courses (PSC. This model can be affected by different types of errors, namely: (1 rounding errors, and (2 non-uniform criteria of rounding the grades. A rigorous analysis of the assessment model was made and the rounding errors involved on each project component were characterized and measured. This resulted in a global maximum error of 0.308 on the individual student project grade, in a 0 to 100 scale. This analysis intended to improve not only the reliability of the assessment results, but also teachers’ awareness of this problem. Recommendations are also made in order to improve the assessment model and reduce the rounding errors as much as possible.

  13. Sustainable model for financial viability of decentralized biomass gasifier based power projects

    NARCIS (Netherlands)

    Palit, D.; Malhotra, R.; Kumar, Atul

    2011-01-01

    This paper made a modest attempt for designing a sustainable model for financial viability of biomass gasifier power projects for enhancing electricity access in India and other developing countries. For long term sustainability of distributed generation projects in remote rural areas, viability

  14. The global sustainability project and the LLNL China energy systems model

    International Nuclear Information System (INIS)

    Harris, N; Lamont, A; Stewart, J; Woodrow, C.

    1999-01-01

    The sustainability of our modern way of life is becoming a major concern of both our domestic and international policy. The Rio conference on the environment and the recent Kyoto conference on global climate change are two indications of the importance of solving global environmental problem. Energy is a key component in global sustainability since obtaining and using it has major environmental effects. If our energy systems are to be sustainable in the long run, they must be structured using technologies that have a minimal impact on our environment and resources. At the same time, they must meet practical economic requirements: they must be reasonably economical, they must meet the needs of society and they must be tailored to the resources that are available in a particular region or country. Because economic considerations and government policies both determine the development of the energy system, economic and systems modeling can help us better understand ways that new technologies and policies can be used to obtain a more sustainable system. The Global Sustainability Project has developed both economic modeling software and models to help us better understand these issues and has applied them to the analysis of energy and environmental problems in China. In the past year, the models and data developed by the project have been used to support other projects investigating the interaction of technologies and the environment. The project this year has focused on software development to improve our modeling tools and on the refinement and application of the China Energy System model. The major thrust of the software development has been improvements in the METANet economic software system. We have modified its solution algorithm to improve speed and accuracy of the solutions and to make it compatible with the SuperCode modeling system. It is planned to eventually merge the two systems to take advantage of the faster, more flexible solution algorithms of Super

  15. Modelling of Transport Projects Uncertainties

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    2009-01-01

    This paper proposes a new way of handling the uncertainties present in transport decision making based on infrastructure appraisals. The paper suggests to combine the principle of Optimism Bias, which depicts the historical tendency of overestimating transport related benefits and underestimating...... to supplement Optimism Bias and the associated Reference Class Forecasting (RCF) technique with a new technique that makes use of a scenario-grid. We tentatively introduce and refer to this as Reference Scenario Forecasting (RSF). The final RSF output from the CBA-DK model consists of a set of scenario......-based graphs which function as risk-related decision support for the appraised transport infrastructure project....

  16. Project Success in Agile Development Software Projects

    Science.gov (United States)

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  17. An IS Project Management Course Project

    Science.gov (United States)

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  18. Evaluation of Project Achievements in VOMARE -project

    OpenAIRE

    Kokkarinen, Eeva

    2011-01-01

    The purpose of the thesis is to study the achievements of VOMARE –project from the Finnish Lifeboat Institutions perspective. The organisation is a roof organisation for voluntary maritime rescue operation in Finland. The Finnish Lifeboat Institution is a lead partner in VOMARE –project which is EU funded project and the aim of the project is to start voluntary rescue operations in Estonia. The theoretical part of the work is divided into two main categories; project management and planni...

  19. Rethinking Project Management in Denmark

    DEFF Research Database (Denmark)

    Svejvig, Per

    2012-01-01

    . The chapter argues for a rethinking process due to pervasiveness and complexity in the contemporary project environment where rethinking is needed in order to stay competitive. The suggested approach for the rethinking project management is a framing process where body of ideas is established......Projects are everywhere across different sectors, industries and countries. Project management is no longer a sub-discipline of engineering and other rather technical disciplines but is also used for many other purposes. Even though practice has changed dramatically over the years, the models...... and methodologies for project management has been fairly static and has therefore received substantial criticism for a lack of relevance to practice. Several scholars have therefore started to think more widely about projects and project management conceptualized as rethinking project management. However this theme...

  20. Modeling geo-homopholy in online social networks for population distribution projection

    Directory of Open Access Journals (Sweden)

    Yuanxing Zhang

    2017-09-01

    Full Text Available Purpose – Projecting the population distribution in geographical regions is important for many applications such as launching marketing campaigns or enhancing the public safety in certain densely populated areas. Conventional studies require the collection of people’s trajectory data through offline means, which is limited in terms of cost and data availability. The wide use of online social network (OSN apps over smartphones has provided the opportunities of devising a lightweight approach of conducting the study using the online data of smartphone apps. This paper aims to reveal the relationship between the online social networks and the offline communities, as well as to project the population distribution by modeling geo-homophily in the online social networks. Design/methodology/approach – In this paper, the authors propose the concept of geo-homophily in OSNs to determine how much the data of an OSN can help project the population distribution in a given division of geographical regions. Specifically, the authors establish a three-layered theoretic framework that first maps the online message diffusion among friends in the OSN to the offline population distribution over a given division of regions via a Dirichlet process and then projects the floating population across the regions. Findings – By experiments over large-scale OSN data sets, the authors show that the proposed prediction models have a high prediction accuracy in characterizing the process of how the population distribution forms and how the floating population changes over time. Originality/value – This paper tries to project population distribution by modeling geo-homophily in OSNs.

  1. Leading global projects for professional and accidental project leaders

    CERN Document Server

    Moran, Robert T

    2008-01-01

    This book is a must-read for anyone responsible for projects and initiatives that span functional and geographical divides. Authors Moran and Youngdahl bring extensive experience and learning from industry practice to present a clear and straightforward treatment of the leadership skills and knowledge required to lead projects that are global in nature. They have written the first book of its kind to address the three essential skills of global project leaders - strategic project management, project leadership, and cross-cultural leadership. The authors argue that global project leadership is an essential skill in our project-based world and that we are all either intentional or accidental project leaders. Intentional project leaders pursue formal project management education and even certification whereas accidental project leaders find themselves leading global projects and initiatives as a result of a special assignment or promotion. Moran and Youndahl have found that the vast majority of global projects ...

  2. Atomic Data and Modelling for Fusion: the ADAS Project

    International Nuclear Information System (INIS)

    Summers, H. P.; O'Mullane, M. G.

    2011-01-01

    The paper is an update on the Atomic Data and Analysis Structure, ADAS, since ICAM-DATA06 and a forward look to its evolution in the next five years. ADAS is an international project supporting principally magnetic confinement fusion research. It has participant laboratories throughout the world, including ITER and all its partner countries. In parallel with ADAS, the ADAS-EU Project provides enhanced support for fusion research at Associated Laboratories and Universities in Europe and ITER. OPEN-ADAS, sponsored jointly by the ADAS Project and IAEA, is the mechanism for open access to principal ADAS atomic data classes and facilitating software for their use. EXTENDED-ADAS comprises a variety of special, integrated application software, beyond the purely atomic bounds of ADAS, tuned closely to specific diagnostic analyses and plasma models.The current scientific content and scope of these various ADAS and ADAS related activities are briefly reviewed. These span a number of themes including heavy element spectroscopy and models, charge exchange spectroscopy, beam emission spectroscopy and special features which provide a broad baseline of atomic modelling and support. Emphasis will be placed on 'lifting the fundamental data baseline'--a principal ADAS task for the next few years. This will include discussion of ADAS and ADAS-EU coordinated and shared activities and some of the methods being exploited.

  3. Reducing Spread in Climate Model Projections of a September Ice-Free Arctic

    Science.gov (United States)

    Liu, Jiping; Song, Mirong; Horton, Radley M.; Hu, Yongyun

    2013-01-01

    This paper addresses the specter of a September ice-free Arctic in the 21st century using newly available simulations from the Coupled Model Intercomparison Project Phase 5 (CMIP5). We find that large spread in the projected timing of the September ice-free Arctic in 30 CMIP5 models is associated at least as much with different atmospheric model components as with initial conditions. Here we reduce the spread in the timing of an ice-free state using two different approaches for the 30 CMIP5 models: (i) model selection based on the ability to reproduce the observed sea ice climatology and variability since 1979 and (ii) constrained estimation based on the strong and persistent relationship between present and future sea ice conditions. Results from the two approaches show good agreement. Under a high-emission scenario both approaches project that September ice extent will drop to approx. 1.7 million sq km in the mid 2040s and reach the ice-free state (defined as 1 million sq km) in 2054-2058. Under a medium-mitigation scenario, both approaches project a decrease to approx.1.7 million sq km in the early 2060s, followed by a leveling off in the ice extent.

  4. Student Research Projects

    Science.gov (United States)

    Yeske, Lanny A.

    1998-01-01

    Numerous FY1998 student research projects were sponsored by the Mississippi State University Center for Air Sea Technology. This technical note describes these projects which include research on: (1) Graphical User Interfaces, (2) Master Environmental Library, (3) Database Management Systems, (4) Naval Interactive Data Analysis System, (5) Relocatable Modeling Environment, (6) Tidal Models, (7) Book Inventories, (8) System Analysis, (9) World Wide Web Development, (10) Virtual Data Warehouse, (11) Enterprise Information Explorer, (12) Equipment Inventories, (13) COADS, and (14) JavaScript Technology.

  5. Disease management projects and the Chronic Care Model in action: baseline qualitative research.

    Science.gov (United States)

    Walters, Bethany Hipple; Adams, Samantha A; Nieboer, Anna P; Bal, Roland

    2012-05-11

    Disease management programs, especially those based on the Chronic Care Model (CCM), are increasingly common in The Netherlands. While disease management programs have been well-researched quantitatively and economically, less qualitative research has been done. The overall aim of the study is to explore how disease management programs are implemented within primary care settings in The Netherlands; this paper focuses on the early development and implementation stages of five disease management programs in the primary care setting, based on interviews with project leadership teams. Eleven semi-structured interviews were conducted at the five selected sites with sixteen professionals interviewed; all project directors and managers were interviewed. The interviews focused on each project's chosen chronic illness (diabetes, eating disorders, COPD, multi-morbidity, CVRM) and project plan, barriers to development and implementation, the project leaders' action and reactions, as well as their roles and responsibilities, and disease management strategies. Analysis was inductive and interpretive, based on the content of the interviews. After analysis, the results of this research on disease management programs and the Chronic Care Model are viewed from a traveling technology framework. This analysis uncovered four themes that can be mapped to disease management and the Chronic Care Model: (1) changing the health care system, (2) patient-centered care, (3) technological systems and barriers, and (4) integrating projects into the larger system. Project leaders discussed the paths, both direct and indirect, for transforming the health care system to one that addresses chronic illness. Patient-centered care was highlighted as needed and a paradigm shift for many. Challenges with technological systems were pervasive. Project leaders managed the expenses of a traveling technology, including the social, financial, and administration involved. At the sites, project leaders served

  6. Prioritising Project Scope Definition Elements in Public Building Projects

    Directory of Open Access Journals (Sweden)

    Mohammed K Fageha

    2014-09-01

    Full Text Available A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI as a basis, the study uses analytical network process (ANP technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of contribution to project scope definition completeness. Finally, Pareto analysis was used to prioritise and assess the distribution pattern of the elements. The outcome from this research is the prioritisation of project scope definition elements for public building projects in Saudi Arabia. The prioritised list developed indicates the importance of project scope definition elements. It should help project management teams identify elements to consider when evaluating project scope definition for completeness at the pre-project planning stage. Keywords: Project scope definition, pre-project planning, prioritising, public building projects, Saudi Arabia, Analytical Network Process (ANP

  7. Results of the ITER toroidal field model coil project

    International Nuclear Information System (INIS)

    Salpietro, E.; Maix, R.

    2001-01-01

    In the scope of the ITER EDA one of the seven largest projects was devoted to the development, manufacture and testing of a Toroidal Field Model Coil (TFMC). The industry consortium AGAN manufactured the TFMC based on on a conceptual design developed by the ITER EDA EU Home Team. The TFMC was completed and assembled in the test facility TOSKA of the Forschungszentrum Karlsruhe in the first half of 2001. The first testing phase started in June 2001 and lasted till October 2001. The first results have shown that the main goals of the project have been achieved

  8. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  9. Projecting future expansion of invasive species: comparing and improving methodologies for species distribution modeling.

    Science.gov (United States)

    Mainali, Kumar P; Warren, Dan L; Dhileepan, Kunjithapatham; McConnachie, Andrew; Strathie, Lorraine; Hassan, Gul; Karki, Debendra; Shrestha, Bharat B; Parmesan, Camille

    2015-12-01

    Modeling the distributions of species, especially of invasive species in non-native ranges, involves multiple challenges. Here, we developed some novel approaches to species distribution modeling aimed at reducing the influences of such challenges and improving the realism of projections. We estimated species-environment relationships for Parthenium hysterophorus L. (Asteraceae) with four modeling methods run with multiple scenarios of (i) sources of occurrences and geographically isolated background ranges for absences, (ii) approaches to drawing background (absence) points, and (iii) alternate sets of predictor variables. We further tested various quantitative metrics of model evaluation against biological insight. Model projections were very sensitive to the choice of training dataset. Model accuracy was much improved using a global dataset for model training, rather than restricting data input to the species' native range. AUC score was a poor metric for model evaluation and, if used alone, was not a useful criterion for assessing model performance. Projections away from the sampled space (i.e., into areas of potential future invasion) were very different depending on the modeling methods used, raising questions about the reliability of ensemble projections. Generalized linear models gave very unrealistic projections far away from the training region. Models that efficiently fit the dominant pattern, but exclude highly local patterns in the dataset and capture interactions as they appear in data (e.g., boosted regression trees), improved generalization of the models. Biological knowledge of the species and its distribution was important in refining choices about the best set of projections. A post hoc test conducted on a new Parthenium dataset from Nepal validated excellent predictive performance of our 'best' model. We showed that vast stretches of currently uninvaded geographic areas on multiple continents harbor highly suitable habitats for parthenium

  10. Modelling climate impact on floods under future emission scenarios using an ensemble of climate model projections

    Science.gov (United States)

    Wetterhall, F.; Cloke, H. L.; He, Y.; Freer, J.; Pappenberger, F.

    2012-04-01

    Evidence provided by modelled assessments of climate change impact on flooding is fundamental to water resource and flood risk decision making. Impact models usually rely on climate projections from Global and Regional Climate Models, and there is no doubt that these provide a useful assessment of future climate change. However, cascading ensembles of climate projections into impact models is not straightforward because of problems of coarse resolution in Global and Regional Climate Models (GCM/RCM) and the deficiencies in modelling high-intensity precipitation events. Thus decisions must be made on how to appropriately pre-process the meteorological variables from GCM/RCMs, such as selection of downscaling methods and application of Model Output Statistics (MOS). In this paper a grand ensemble of projections from several GCM/RCM are used to drive a hydrological model and analyse the resulting future flood projections for the Upper Severn, UK. The impact and implications of applying MOS techniques to precipitation as well as hydrological model parameter uncertainty is taken into account. The resultant grand ensemble of future river discharge projections from the RCM/GCM-hydrological model chain is evaluated against a response surface technique combined with a perturbed physics experiment creating a probabilisic ensemble climate model outputs. The ensemble distribution of results show that future risk of flooding in the Upper Severn increases compared to present conditions, however, the study highlights that the uncertainties are large and that strong assumptions were made in using Model Output Statistics to produce the estimates of future discharge. The importance of analysing on a seasonal basis rather than just annual is highlighted. The inability of the RCMs (and GCMs) to produce realistic precipitation patterns, even in present conditions, is a major caveat of local climate impact studies on flooding, and this should be a focus for future development.

  11. Perspectives on projects, project success and team work

    OpenAIRE

    Thompson, Karen

    2015-01-01

    This paper brings together perspectives on projects, project success and team work as a background to two graphical tools for considering project success and individual capabilities for working in a project team.

  12. A project management framework for enhanced productivity performance using building information modelling

    Directory of Open Access Journals (Sweden)

    Longhui Liao

    2017-09-01

    Full Text Available Although the Singapore government has mandated submissions of building plans in building information modelling (BIM format since July 2013, this does not yet seem to lead to enhanced productivity performance. BIM collaboration between designers and downstream contractors appears to remain inadequate. While many studies have been conducted on using BIM for better project outcomes, studies that relate BIM with the identification of non-value adding activities in the project lifecycle and the reduction of the resulting wastes are at infancy stage. This paper aims to propose a project management framework for enhancing the productivity of building projects in Singapore, which forms Phase I of an ongoing research project. A two-pronged approach is presented. Firstly, non-value adding activities in the current project delivery process that uses BIM partially in Singapore are identified by comparing the typical current process with full BIM-based processes; such activities are cut down after process transformation in terms of people, process, and technology. Secondly, time savings derived from reducing the wastes caused by these activities are quantified. The proposed framework was validated by a case study of a local residential project. It was concluded that this framework provides a valuable tool for project teams to enhance productivity performance.

  13. Project Management Yinyang: Coupling project success and client satisfaction

    Directory of Open Access Journals (Sweden)

    Greg Stewart Usher

    2017-06-01

    Full Text Available Our research applies paradox theory to a project management construct to help project management researchers and practitioners understand the tensions that can exist between project success and client satisfaction. Our research highlights that although project success and client satisfaction are both present within a project management construct, they also belong to different functional systems. Project success and client satisfaction have different systemic-discourses and use different language games to convey information. These distinctions can create latent and sometimes salient tensions within the project management construct that project managers must understand, embrace, and work with. We have used a Grounded Theory (GT methodology to explore the lived experience of project managers, and from this have identified a phenomenon which we have termed project management yinyang. Project management yinyang is the state that exists when both project success and Client satisfaction are tightly coupled within the project management construct. Project management yinyang highlights that these two phenomena cannot be viewed as separate elements because the ‘seed’ of each exists within the other. And to truly achieve one, you must also achieve the other. Our findings indicate that in order to create project management yinyang the project manager must embrace a paradoxical yet holistic philosophy. They must understand the complementarity, interdependency, and structural coupling that exists between the positivist and interpretivist paradigms within the project management construct. They must understand how satisfaction (Yin and success (Yang are created through focus. Furthermore, they must understand how project management yinyang is separate from, but borne from, the convergence of the other two elements.

  14. Quality Assurance Project Plan for Citizen Science Projects

    Science.gov (United States)

    The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.

  15. Supporting Current Energy Conversion Projects through Numerical Modeling

    Science.gov (United States)

    James, S. C.; Roberts, J.

    2016-02-01

    The primary goals of current energy conversion (CEC) technology being developed today are to optimize energy output and minimize environmental impact. CEC turbines generate energy from tidal and current systems and create wakes that interact with turbines located downstream of a device. The placement of devices can greatly influence power generation and structural reliability. CECs can also alter the environment surrounding the turbines, such as flow regimes, sediment dynamics, and water quality. These alterations pose potential stressors to numerous environmental receptors. Software is needed to investigate specific CEC sites to simulate power generation and hydrodynamic responses of a flow through a CEC turbine array so that these potential impacts can be evaluated. Moreover, this software can be used to optimize array layouts that yield the least changes to the environmental (i.e., hydrodynamics, sediment dynamics, and water quality). Through model calibration exercises, simulated wake profiles and turbulence intensities compare favorably to the experimental data and demonstrate the utility and accuracy of a fast-running tool for future siting and analysis of CEC arrays in complex domains. The Delft3D modeling tool facilitates siting of CEC projects through optimization of array layouts and evaluation of potential environmental effect all while provide a common "language" for academics, industry, and regulators to be able to discuss the implications of marine renewable energy projects. Given the enormity of any full-scale marine renewable energy project, it necessarily falls to modeling to evaluate how array operations must be addressed in an environmental impact statement in a way that engenders confidence in the assessment of the CEC array to minimize environmental effects.

  16. FUNCTIONAL MODEL OF THE MATERIAL RESOURCES MANAGEMENT FOR PROJECTS OF THE CREATION OF NEW TECHNIQUES

    Directory of Open Access Journals (Sweden)

    S. Yu. Danshyna

    2016-01-01

    Full Text Available The article is devoted to problem of material management arising in the implementation of projects for the development and creation (modernization of the new techniques. The uniqueness of the projects, their limit on the cost and time does not allow the use of traditional approaches to resource management. Such projects are often implemented in the development of companies; where it is not possible to abandon the traditional operating methods of management. The aim of the article is a formalization of the process of material management of projects, a description of its information flows for integrate into the project management practices and for improve the efficiency of material management. For the systematization of information arising from the material resources management, invited the set-theoretic representation of the management process. According with the requirements of project management standards were described the sets and defined rules of their transformation. Specification of the set-theoretic representation helped to establish the area and limits of the modelling process. Further decomposition process became the basis of the functional model, constructed in accordance with the methodology IDEF 0. A graphical representation of the model allows you to visualize the process at different levels of detail. For specification of issues related to the organization and promotion of material flow, were developed functional models of sub-processes and were described the identified data-flows. For the harmonization of process and project approaches formulated conditions for evaluating the efficiency of material management. The developed models can be the basis for designing the structure of companies, for regulation of their project activities, as well as for establishing an information system of management resources of projects.

  17. Identifying High Performance ERP Projects

    OpenAIRE

    Stensrud, Erik; Myrtveit, Ingunn

    2002-01-01

    Learning from high performance projects is crucial for software process improvement. Therefore, we need to identify outstanding projects that may serve as role models. It is common to measure productivity as an indicator of performance. It is vital that productivity measurements deal correctly with variable returns to scale and multivariate data. Software projects generally exhibit variable returns to scale, and the output from ERP projects is multivariate. We propose to use Data Envelopment ...

  18. Organizational analysis of construction projects

    OpenAIRE

    Hughes, Will

    1989-01-01

    This research project is about the analysis of construction project organizations. The work is based on organizational theory and is a development of Linear Responsibility Analysis (LRA). The aim is to assess the extent to which project success is affected by organizational structure. The analysis of four public sector case studies raises several issues. First is the need for a systematic model of describing and analysing construction project environments. A framework has been developed that ...

  19. Developing a Massively Parallel Forward Projection Radiography Model for Large-Scale Industrial Applications

    Energy Technology Data Exchange (ETDEWEB)

    Bauerle, Matthew [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-08-01

    This project utilizes Graphics Processing Units (GPUs) to compute radiograph simulations for arbitrary objects. The generation of radiographs, also known as the forward projection imaging model, is computationally intensive and not widely utilized. The goal of this research is to develop a massively parallel algorithm that can compute forward projections for objects with a trillion voxels (3D pixels). To achieve this end, the data are divided into blocks that can each t into GPU memory. The forward projected image is also divided into segments to allow for future parallelization and to avoid needless computations.

  20. Supply Chain Management in Flyover Projects in India

    Directory of Open Access Journals (Sweden)

    Sudhir Yadav

    2015-01-01

    Full Text Available This paper explores the application of supply chain management (SCM in the Indian construction industry. The authors studied the SCM practices followed in flyover projects and compared them with the seamless SCM model for construction proposed by a previous study. A case study approach was followed for the research work. Structured interviews were conducted to understand the SCM practices in flyover projects in India. The developed model advocates leading roles for client and strategic needs analysis and value management study that are missing in the studied projects. All of the projects studied faced cost and time overruns. The seamless SCM model may be extended to developing countries by incorporating requirements related to the long-term relationship between project agents and, if possible, by suggesting that clients should not select agents using only the minimal cost criteria. The extended model also proposes SCM training for all project agents before the start of the project. Strategic needs analysis and value management study should be an integral part of the construction project to improve project efficiency. Implementing the seamless SCM model calls for the early involvement (i.e., at the project design stage of all project agents. Project sponsors can apply the findings of this study to manage time and cost overruns.

  1. Success probability orientated optimization model for resource allocation of the technological innovation multi-project system

    Institute of Scientific and Technical Information of China (English)

    Weixu Dai; Weiwei Wu; Bo Yu; Yunhao Zhu

    2016-01-01

    A success probability orientated optimization model for resource al ocation of the technological innovation multi-project system is studied. Based on the definition of the technological in-novation multi-project system, the leveling optimization of cost and success probability is set as the objective of resource al ocation. The cost function and the probability function of the optimization model are constructed. Then the objective function of the model is constructed and the solving process is explained. The model is applied to the resource al ocation of an enterprise’s technological innovation multi-project system. The results show that the pro-posed model is more effective in rational resource al ocation, and is more applicable in maximizing the utility of the technological innovation multi-project system.

  2. Competence development organizations in project management on the basis of genomic model methodologies

    OpenAIRE

    Бушуев, Сергей Дмитриевич; Рогозина, Виктория Борисовна; Ярошенко, Юрий Федерович

    2013-01-01

    The matrix technology for identification of organisational competencies in project management is presented in the article. Matrix elements are the components of organizational competence in the field of project management and project management methodology represented in the structure of the genome. The matrix model of competence in the framework of the adopted methodologies and scanning method for identifying organizational competences formalised. Proposed methods for building effective proj...

  3. Managing a big ground-based astronomy project: the Thirty Meter Telescope (TMT) project

    Science.gov (United States)

    Sanders, Gary H.

    2008-07-01

    TMT is a big science project and its scale is greater than previous ground-based optical/infrared telescope projects. This paper will describe the ideal "linear" project and how the TMT project departs from that ideal. The paper will describe the needed adaptations to successfully manage real world complexities. The progression from science requirements to a reference design, the development of a product-oriented Work Breakdown Structure (WBS) and an organization that parallels the WBS, the implementation of system engineering, requirements definition and the progression through Conceptual Design to Preliminary Design will be summarized. The development of a detailed cost estimate structured by the WBS, and the methodology of risk analysis to estimate contingency fund requirements will be summarized. Designing the project schedule defines the construction plan and, together with the cost model, provides the basis for executing the project guided by an earned value performance measurement system.

  4. Revenue Risk Modelling and Assessment on BOT Highway Project

    Science.gov (United States)

    Novianti, T.; Setyawan, H. Y.

    2018-01-01

    The infrastructure project which is considered as a public-private partnership approach under BOT (Build-Operate-Transfer) arrangement, such as a highway, is risky. Therefore, assessment on risk factors is essential as the project have a concession period and is influenced by macroeconomic factors and consensus period. In this study, pre-construction risks of a highway were examined by using a Delphi method to create a space for offline expert discussions; a fault tree analysis to map intuition of experts and to create a model from the underlying risk events; a fuzzy logic to interpret the linguistic data of risk models. The loss of revenue for risk tariff, traffic volume, force majeure, and income were then measured. The results showed that the loss of revenue caused by the risk tariff was 10.5% of the normal total revenue. The loss of revenue caused by the risk of traffic volume was 21.0% of total revenue. The loss of revenue caused by the force majeure was 12.2% of the normal income. The loss of income caused by the non-revenue events was 6.9% of the normal revenue. It was also found that the volume of traffic was the major risk of a highway project because it related to customer preferences.

  5. Project Management

    DEFF Research Database (Denmark)

    Pilkington, Alan; Chai, Kah-Hin; Le, Yang

    2015-01-01

    This paper identifies the true coverage of PM theory through a bibliometric analysis of the International Journal of Project Management from 1996-2012. We identify six persistent research themes: project time management, project risk management, programme management, large-scale project management......, project success/failure and practitioner development. These differ from those presented in review and editorial articles in the literature. In addition, topics missing from the PM BOK: knowledge management project-based organization and project portfolio management have become more popular topics...

  6. A framework for extracting and representing project knowledge contexts using topic models and dynamic knowledge maps

    Science.gov (United States)

    Xu, Jin; Li, Zheng; Li, Shuliang; Zhang, Yanyan

    2015-07-01

    There is still a lack of effective paradigms and tools for analysing and discovering the contents and relationships of project knowledge contexts in the field of project management. In this paper, a new framework for extracting and representing project knowledge contexts using topic models and dynamic knowledge maps under big data environments is proposed and developed. The conceptual paradigm, theoretical underpinning, extended topic model, and illustration examples of the ontology model for project knowledge maps are presented, with further research work envisaged.

  7. The TARGET project in Tuscany: the first disease management model of a regional project for the prevention of hip re-fractures in the elderly.

    Science.gov (United States)

    Piscitelli, Prisco; Brandi, Maria Luisa; Nuti, Ranuccio; Rizzuti, Carla; Giorni, Loredano; Giovannini, Valtere; Metozzi, Alessia; Merlotti, Daniela

    2010-09-01

    The official inquiry on osteoporosis in Italy, promoted by the Italian Senate in 2002 concluded that proper preventive strategies should be adopted at regional level in order to prevent osteoporotic fractures. Tuscany is the first Italian region who has promoted an official program (the TARGET project) aimed to reduce osteoporotic fractures by ensuring adequate treatment to all people aged ≥65 years old who experience a hip fragility fracture. this paper provides information concerning the implementation of TARGET project in Tuscany, assuming that it may represent an useful model for similar experiences to be promoted in other Italian Regions and across Europe. we have examined the model proposed for the regional program, and we have particularly analyzed the in-hospital and post-hospitalization path of hip fractured patients aged >65 years old in Tuscany after the adoption of TARGET project by Tuscany healthcare system and during its ongoing start-up phase. orthopaedic surgeons have been gradually involved in the project and are increasingly fulfilling all the clinical prescriptions and recommendations provided in the project protocol. Different forms of cooperation between orthopaedic surgeons and other clinical specialists have been adopted at each hospital for the treatment of hip fractured elderly patients. GPs involvement needs to be fostered both at regional and local level. The effort of Tuscany region to cope with hip fractures suffered from elderly people must be acknowledged as an interesting way of addressing this critical health problem. Specific preventive strategies modelled on the Tuscany TARGET project should be implemented in other Italian regions.

  8. Geomechanical/Geochemical Modeling Studies Conducted within the International DECOVALEX Project

    International Nuclear Information System (INIS)

    Birkholzer, J.T.; Rutqvist, J.; Sonnenthal, E.L.; Barr, D.; Chijimatsu, M.; Kolditz, O.; Liu, Q.; Oda, Y.; Wang, W.; Xie, M.; Zhang, C.

    2005-01-01

    The DECOVALEX project is an international cooperative project initiated by SKI, the Swedish Nuclear Power Inspectorate, with participation of about 10 international organizations. The general goal of this project is to encourage multidisciplinary interactive and cooperative research on modeling coupled thermo-hydro-mechanical-chemical (THMC) processes in geologic formations in support of the performance assessment for underground storage of radioactive waste. One of the research tasks, initiated in 2004 by the U.S. Department of Energy (DOE), addresses the long-term impact of geomechanical and geochemical processes on the flow conditions near waste emplacement tunnels. Within this task, four international research teams conduct predictive analysis of the coupled processes in two generic repositories, using multiple approaches and different computer codes. Below, we give an overview of the research task and report its current status

  9. Geomechanical/Geochemical Modeling Studies Conducted Within the International DECOVALEX Project

    International Nuclear Information System (INIS)

    J.T. Birkholzer; J. Rutqvist; E.L. Sonnenthal; D. Barr; M.Chijimatsu; O. Kolditz; Q. Liu; Y. Oda; W. Wang; M. Xie; C. Zhang

    2006-01-01

    The DECOVALEX project is an international cooperative project initiated by SKI, the Swedish Nuclear Power Inspectorate, with participation of about 10 international organizations. The general goal of this project is to encourage multidisciplinary interactive and cooperative research on modeling coupled thermo-hydro-mechanical-chemical (THMC) processes in geologic formations in support of the performance assessment for underground storage of radioactive waste. One of the research tasks, initiated in 2004 by the U.S. Department of Energy (DOE), addresses the long-term impact of geomechanical and geochemical processes on the flow conditions near waste emplacement tunnels. Within this task, four international research teams conduct predictive analysis of the coupled processes in two generic repositories, using multiple approaches and different computer codes. Below, we give an overview of the research task and report its current status

  10. [Reconstruction and measurement of a digital dental model using grating projection and reverse engineering].

    Science.gov (United States)

    Zhenzhen, Wang; Yi, Lu; Jun, Song; Jun, Chen; Qin, Zhou

    2015-02-01

    This work lays the foundation for establishing a digital model database with normal occlusion. A digital dental cast is acquired through grating projection, and model features are measured through reverse engineering. The grating projection system controlled by a computer was projected onto the surface of a normal dental model. Three-dimensional contour data were obtained through multi-angle shooting. A three-dimensional model was constructed, and the model features were analyzed by using reverse engineering. The digital model was compared with the plaster model to determine the accuracy of the measurement system. The structure of three-dimensional reconstruction model was clear. The digital models of two measurements exhibited no significant difference (P > 0.05). When digital and plaster models were measured, we found that the crown length and arch width were not statistically different (P > 0.05), whereas the difference between the crown width and arch length was statistically significant (P model by using the grating projection technique and reverse engineering can be used for dental model measurement in clinic al and scientific research and can provide a scientific method for establishing a digital model database with normal occlusion.

  11. Project control - the next generation

    International Nuclear Information System (INIS)

    Iorii, V.F.; McKinnon, B.L.

    1993-01-01

    The Yucca Mountain Site Characterization Project (YMP) is the U.S. Department of Energy's (DOE) second largest Major System Acquisition Project. We have developed an integrated planning and control system (called PACS) that we believe represents the 'Next Generation' in project control. PACS integrates technical scope, cost, and schedule information for over 50 participating organizations and produces performances measurement reports for science and engineering managers at all levels. Our 'Next Generation' project control too, PACS, has been found to be in compliance with the new DOE Project Control System Guidelines. Additionally, the nuclear utility oversight group of the Edison Electric Institute has suggested PACS be used as a model for other civilian radioactive waste management projects. A 'Next Generation' project control tool will be necessary to do science in the 21st century

  12. European project for a multinational macrosectoral model

    Energy Technology Data Exchange (ETDEWEB)

    d' Alcantara, G; Italianer, A

    1984-01-01

    This paper describes the HERMES project, a multinational macrosectoral European econometric modelling effort, sponsored by the Directorates General II (Economic and Financial Affairs), XII (Science, Research and Development), XVII (Energy) and the SOEC. The set-up of the model is sketched against the background of problems of growth, unemployment, inflation, trade balances, government balances and energy policy. Although the definitions of the variables and a complete specification of the model are given in the Appendix, the major features of the model are described extensively in the text. These include private and collective consumption (incl. a consumer demand system), the putty-clay production process, price and wage formation, sectoral bilateral trade flows and integrated energy economy modelling.

  13. Angular momentum projected wave-functions

    International Nuclear Information System (INIS)

    Bengtsson, R.; Haakansson, H.B.

    1978-01-01

    Angular momentum projection has become a vital link between intrinsic model-wavefunctions and the physical states one intends to describe. We discuss in general terms some aspects of angular momentum projection and present results from projection on e.g. cranking wavefunctions. Mass densities and spectroscopic factors are also presented for some cases. (author)

  14. Understanding and managing three-dimensional/four-dimensional model implementations at the project team level

    NARCIS (Netherlands)

    Hartmann, Timo; Levitt, R.

    2010-01-01

    This paper introduces an extant, theoretical, social-psychological model that explains the sense-making processes of project managers confronted with a new technology to improve our understanding of project-based innovation processes. The model represents the interlinked processes through which

  15. Modeling Change in Project Duration and Completion

    DEFF Research Database (Denmark)

    Wiltshire, Travis; Butner, Jonathan E.; Pirtle, Zachary

    2017-01-01

    In complex work domains and organizations, understanding scheduleing dynamics can ensure objectives are reached and delays are mitigated. In the current paper, we examine the scheduling dynamics for NASA’s Exploration Flight Test 1 (EFT-1) activities. For this examination, we specifically modeled...... simultaneous change in percent complete and estimated duration for a given project as they were included in monthly reports over time. In short, we utilized latent change score mixture modeling to extract the attractor dynamics within the scheduling data. We found three primarily patterns: an attractor at low...

  16. PENGARUH MODEL PROJECT BASED LEARNING TERHADAP KEMAMPUAN BERPIKIR KREATIF MATEMATIKA SISWA

    Directory of Open Access Journals (Sweden)

    Hesti Noviyana

    2017-09-01

    Full Text Available Abstract: The problems in this study relate to the learning model of Project Based Learning and students' creative thinking ability in mathematics. The purpose of the research to know the influence of the model of Project Based Learning on the ability to think creatively mathematics students VIII grade even semester SMP Negeri 3 Bandar Lampung lesson 2016/2017 . The research used experimental method with the population that is all students of class VIII with the amount of 347, while the sample is taken 2 class that is class VIII A as experiment class which amounted to 31, class VIII C as control class which amounted 30. The sample was taken using Cluster Random Sampling technique. To know the ability of creative thinking mathematics students authors perform tests in the form of essays as many as 5 questions that have been tested the validity and reliability. Hypothesis testing in this study using t test. From the results of hypothesis testing using t-test obtained t value = 14.27. From the distribution table t at the significant level of 5% is known t = 2.00 means t> t, so it can be concluded "There is Influence of Model Based Project Based on the Ability of Creative Thinking Mathematics Students".Keywords: Project Based Learning, creative thinking ability of mathematics

  17. Models for assessment of public-private partnership projects in subsurface management

    Directory of Open Access Journals (Sweden)

    И. С. Калгина

    2017-04-01

    Full Text Available Aims and goals of this paper. The article is devoted to analysis of issues related to development of public-private partnership (PPP projects in mineral resources sector of Russia. The special emphasis is given to the most common PPP model in the field of industrial infrastructure construction using the Investment Fund of RF. We offer specific tools to be used with Russian models for assessment of PPP projects and forecasting of its efficiency for its participants. This model allows evaluating the results of the whole deposit development process, constructing graphs of all types of expenditures and revenues (by years, and having rent assessment of deposit NPV (net present value and internal rent rate (IRR.Methods and results. The iteration process at each step enables assessment of budget revenue forecast, living standards indexes, ecological parameters and performance indicators, as well as a certain variant of PPP project implementation for investors (direct government expenses on implementation of infrastructure objects and environmental activities, tax benefits. We have a set of tools for supporting the management decision making process in developing efficient PPP mechanism, balancing long-term government interests, private sector and local people interests arising during socio-economic development of mineral resources area. This method using the suggested tools for analyzing efficiency of a specific partnership mechanism is shown on the examples of projects of developing different deposits in Transbaikal region.

  18. Project financing

    International Nuclear Information System (INIS)

    Cowan, A.

    1998-01-01

    Project financing was defined ('where a lender to a specific project has recourse only to the cash flow and assets of that project for repayment and security respectively') and its attributes were described. Project financing was said to be particularly well suited to power, pipeline, mining, telecommunications, petro-chemicals, road construction, and oil and gas projects, i.e. large infrastructure projects that are difficult to fund on-balance sheet, where the risk profile of a project does not fit the corporation's risk appetite, or where higher leverage is required. Sources of project financing were identified. The need to analyze and mitigate risks, and being aware that lenders always take a conservative view and gravitate towards the lowest common denominator, were considered the key to success in obtaining project financing funds. TransAlta Corporation's project financing experiences were used to illustrate the potential of this source of financing

  19. Wisdom for Building the Project Manager/Project Sponsor Relationship: Partnership for Project Success

    National Research Council Canada - National Science Library

    Patton, Nanette; Shechet, Allan

    2007-01-01

    .... This article discusses conventional roles and responsibilities of the project sponsor and then discusses strategies a project manager can employ to define boundaries to reduce role confusion and promote partnership to facilitate project success.

  20. Catchment Models and Management Tools for diffuse Contaminants (Sediment, Phosphorus and Pesticides): DIFFUSE Project

    Science.gov (United States)

    Mockler, Eva; Reaney, Simeon; Mellander, Per-Erik; Wade, Andrew; Collins, Adrian; Arheimer, Berit; Bruen, Michael

    2017-04-01

    The agricultural sector is the most common suspected source of nutrient pollution in Irish rivers. However, it is also often the most difficult source to characterise due to its predominantly diffuse nature. Particulate phosphorus in surface water and dissolved phosphorus in groundwater are of particular concern in Irish water bodies. Hence the further development of models and indices to assess diffuse sources of contaminants are required for use by the Irish Environmental Protection Agency (EPA) to provide support for river basin planning. Understanding connectivity in the landscape is a vital component of characterising the source-pathway-receptor relationships for water-borne contaminants, and hence is a priority in this research. The DIFFUSE Project will focus on connectivity modelling and incorporation of connectivity into sediment, nutrient and pesticide risk mapping. The Irish approach to understanding and managing natural water bodies has developed substantially in recent years assisted by outputs from multiple research projects, including modelling and analysis tools developed during the Pathways and CatchmentTools projects. These include the Pollution Impact Potential (PIP) maps, which are an example of research output that is used by the EPA to support catchment management. The PIP maps integrate an understanding of the pollution pressures and mobilisation pathways and, using the source-pathways-receptor model, provide a scientific basis for evaluation of mitigation measures. These maps indicate the potential risk posed by nitrate and phosphate from diffuse agricultural sources to surface and groundwater receptors and delineate critical source areas (CSAs) as a means of facilitating the targeting of mitigation measures. Building on this previous research, the DIFFUSE Project will develop revised and new catchment managements tools focused on connectivity, sediment, phosphorus and pesticides. The DIFFUSE project will strive to identify the state

  1. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  2. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  3. Disease management projects and the Chronic Care Model in action: baseline qualitative research

    Science.gov (United States)

    2012-01-01

    Background Disease management programs, especially those based on the Chronic Care Model (CCM), are increasingly common in the Netherlands. While disease management programs have been well-researched quantitatively and economically, less qualitative research has been done. The overall aim of the study is to explore how disease management programs are implemented within primary care settings in the Netherlands; this paper focuses on the early development and implementation stages of five disease management programs in the primary care setting, based on interviews with project leadership teams. Methods Eleven semi-structured interviews were conducted at the five selected sites with sixteen professionals interviewed; all project directors and managers were interviewed. The interviews focused on each project’s chosen chronic illness (diabetes, eating disorders, COPD, multi-morbidity, CVRM) and project plan, barriers to development and implementation, the project leaders’ action and reactions, as well as their roles and responsibilities, and disease management strategies. Analysis was inductive and interpretive, based on the content of the interviews. After analysis, the results of this research on disease management programs and the Chronic Care Model are viewed from a traveling technology framework. Results This analysis uncovered four themes that can be mapped to disease management and the Chronic Care Model: (1) changing the health care system, (2) patient-centered care, (3) technological systems and barriers, and (4) integrating projects into the larger system. Project leaders discussed the paths, both direct and indirect, for transforming the health care system to one that addresses chronic illness. Patient-centered care was highlighted as needed and a paradigm shift for many. Challenges with technological systems were pervasive. Project leaders managed the expenses of a traveling technology, including the social, financial, and administration involved

  4. Compilation Of An Econometric Human Resource Efficiency Model For Project Management Best Practices

    Directory of Open Access Journals (Sweden)

    G. van Zyl

    2006-11-01

    Full Text Available The aim of the paper is to introduce a human resource efficiency model in order to rank the most important human resource driving forces for project management best practices. The results of the model will demonstrate how the human resource component of project management acts as the primary function to enhance organizational performance, codified through improved logical end-state programmes, work ethics and process contributions. Given the hypothesis that project management best practices involve significant human resource and organizational changes, one would reasonably expect this process to influence and resonate throughout all the dimensions of an organisation.

  5. Causes of model dry and warm bias over central U.S. and impact on climate projections.

    Science.gov (United States)

    Lin, Yanluan; Dong, Wenhao; Zhang, Minghua; Xie, Yuanyu; Xue, Wei; Huang, Jianbin; Luo, Yong

    2017-10-12

    Climate models show a conspicuous summer warm and dry bias over the central United States. Using results from 19 climate models in the Coupled Model Intercomparison Project Phase 5 (CMIP5), we report a persistent dependence of warm bias on dry bias with the precipitation deficit leading the warm bias over this region. The precipitation deficit is associated with the widespread failure of models in capturing strong rainfall events in summer over the central U.S. A robust linear relationship between the projected warming and the present-day warm bias enables us to empirically correct future temperature projections. By the end of the 21st century under the RCP8.5 scenario, the corrections substantially narrow the intermodel spread of the projections and reduce the projected temperature by 2.5 K, resulting mainly from the removal of the warm bias. Instead of a sharp decrease, after this correction the projected precipitation is nearly neutral for all scenarios.Climate models repeatedly show a warm and dry bias over the central United States, but the origin of this bias remains unclear. Here the authors associate this bias to precipitation deficits in models and after applying a correction, projected precipitation in this region shows no significant changes.

  6. Projected shell model study of neutron- deficient 122Ce

    Indian Academy of Sciences (India)

    Projected shell model; band diagram; yrast energies; electromagnetic quan- ... signed to 122Ce by detecting γ-rays in coincidence with evaporated charged particles .... 0.75 from the free nucleon values to account for the core-polarization and ...

  7. Twisted sigma-model solitons on the quantum projective line

    Science.gov (United States)

    Landi, Giovanni

    2018-04-01

    On the configuration space of projections in a noncommutative algebra, and for an automorphism of the algebra, we use a twisted Hochschild cocycle for an action functional and a twisted cyclic cocycle for a topological term. The latter is Hochschild-cohomologous to the former and positivity in twisted Hochschild cohomology results into a lower bound for the action functional. While the equations for the critical points are rather involved, the use of the positivity and the bound by the topological term lead to self-duality equations (thus yielding twisted noncommutative sigma-model solitons, or instantons). We present explicit nontrivial solutions on the quantum projective line.

  8. Project structure plan requirements for the deconstruction projects

    International Nuclear Information System (INIS)

    Petrasch, Peter; Schmitt, Christian; Stapf, Meike

    2011-01-01

    The deconstruction of nuclear facilities requires due to the particular conditions and the size of the project a special project planning. The authors analyze the possible requirements to be fulfilled by a project structure plan for nuclear facilities, including personnel resources, organization structure, budget questions, operation and project oriented measures, possibility of modifications and supplements. Further topics include controlling and project realization procedures, documentation, third party activities (authorities, consultants, surveyors), logistics and transport, and radiation protection issues. Several questions remain for plants-specific planning, including the integration of the plant personnel, administrative work, project management, economic and financial issues, radioactive waste management issues.

  9. Adapting Project Management Practices to Research-Based Projects

    Science.gov (United States)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  10. FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2

    International Nuclear Information System (INIS)

    1991-02-01

    Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes ''end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made

  11. Enhanced project management tool

    Science.gov (United States)

    Hsu, Chen-Jung (Inventor); Patel, Hemil N. (Inventor); Maluf, David A. (Inventor); Moh Hashim, Jairon C. (Inventor); Tran, Khai Peter B. (Inventor)

    2012-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.

  12. Reducing failures rate within the project documentation using Building Information Modelling, especially Level of Development

    Directory of Open Access Journals (Sweden)

    Prušková Kristýna

    2018-01-01

    Full Text Available Paper´s focus is on differences between traditional modelling in 2D software and modelling within the BIM technology. Research uncovers failures connected to the traditional way of designing and construction of project documentation. There are revealed and shown mismatches within the project documentation. Solution within the Building information modelling Technology is outlined. As a reference, there is used experience with design of specific building in both ways of construction of project documentation: in the way of traditional modelling and in the way when using BIM technology, especially using Level of Development. Output of this paper is pointing to benefits of using advanced technology in building design, thus Building Information Modelling, especially Level of Development, which leads to reducing failures rate within the project documentation.

  13. Research on evaluating water resource resilience based on projection pursuit classification model

    Science.gov (United States)

    Liu, Dong; Zhao, Dan; Liang, Xu; Wu, Qiuchen

    2016-03-01

    Water is a fundamental natural resource while agriculture water guarantees the grain output, which shows that the utilization and management of water resource have a significant practical meaning. Regional agricultural water resource system features with unpredictable, self-organization, and non-linear which lays a certain difficulty on the evaluation of regional agriculture water resource resilience. The current research on water resource resilience remains to focus on qualitative analysis and the quantitative analysis is still in the primary stage, thus, according to the above issues, projection pursuit classification model is brought forward. With the help of artificial fish-swarm algorithm (AFSA), it optimizes the projection index function, seeks for the optimal projection direction, and improves AFSA with the application of self-adaptive artificial fish step and crowding factor. Taking Hongxinglong Administration of Heilongjiang as the research base and on the basis of improving AFSA, it established the evaluation of projection pursuit classification model to agriculture water resource system resilience besides the proceeding analysis of projection pursuit classification model on accelerating genetic algorithm. The research shows that the water resource resilience of Hongxinglong is the best than Raohe Farm, and the last 597 Farm. And the further analysis shows that the key driving factors influencing agricultural water resource resilience are precipitation and agriculture water consumption. The research result reveals the restoring situation of the local water resource system, providing foundation for agriculture water resource management.

  14. Organization of BSc and MSc projects in project families

    DEFF Research Database (Denmark)

    Ottosen, Lisbeth M.; Goltermann, Per; Jensen, Pernille Erland

    2014-01-01

    This work reports organization of student thesis projects in project families, with the benefit to both teaching and learning. The project organization went from student projects broadly distributed on topics related to different research issues and individual supervision to project families with...

  15. Project finance of hydroelectric power plants in Brazil; 'Project finance' de usinas hidroeletricas no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro Filho, Valfredo de Assis; Ramos, Maria Olivia de Souza [Universidade Salvador (UNIFACS), BA (Brazil)

    2008-07-01

    The aim of this paper is to discuss the modality of project finance of financing of enterprises, which is the main modality of structuring of hydroelectric projects in Brazil. In the discussion will be highlighted the importance of contracts EPC (Engineering, Search and Construction) in the structuring of project finances. This financing model has particular characteristics related to risk sharing and financial flexibility that enable the financing of projects with long-term capital, however, due to participation of various actors and the nature of the structure of project finance, the negotiation and drafting of contracts are always very complex.

  16. Sustainability, creativity and innovation in project management – Model development for assessing organizational performance through projects

    OpenAIRE

    Szabó, Lajos

    2016-01-01

    Today a number of studies are published on how organizational strategy is developed and how organizations contribute to local and regional development through the realization of these strategies. There are also many articles dealing with the success of a project by identifying the criteria and the factors that influence them. This article introduces the project-oriented strategic planning process that reveals how projects contribute to local and regional development and demonstrates the relat...

  17. A Model of Successful School Leadership from the International Successful School Principalship Project

    Directory of Open Access Journals (Sweden)

    David Gurr

    2015-03-01

    Full Text Available The International Successful School Principalship Project (ISSPP has been actively conducting research about the work of successful principals since 2001. Findings from four project books and eight models derived from this project are synthesised into a model of successful school leadership. Building on Gurr, Drysdale and Mulford’s earlier model, the work of school leaders is described as engaging within the school context to influence student and school outcomes through interventions in teaching and learning, school capacity building, and the wider context. The qualities a leader brings to their role, a portfolio approach to using leadership ideas, constructing networks, collaborations and partnerships, and utilising accountability and evaluation for evidence-informed improvement, are important additional elements. The model is applicable to all in leadership roles in schools.

  18. SIMULATION OF ORGANIZATIONAL ILLNESSES IN PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Денис Антонович ХАРИТОНОВ

    2015-05-01

    Full Text Available The article examined the fractal model of organizational diagnosis of pathologies in project management development. The proposed fractal model based on the competency approach to project management and allows evaluating the pathology of the project-oriented organizations.

  19. Collaborative Management of Complex Major Construction Projects: AnyLogic-Based Simulation Modelling

    Directory of Open Access Journals (Sweden)

    Na Zhao

    2016-01-01

    Full Text Available Complex supply chain system collaborative management of major construction projects effectively integrates the different participants in the construction project. This paper establishes a simulation model based on AnyLogic to reveal the collaborative elements in the complex supply chain management system and the modes of action as well as the transmission problems of the intent information. Thus it is promoting the participants to become an organism with coordinated development and coevolution. This study can help improve the efficiency and management of the complex system of major construction projects.

  20. Scheduling projects with multiskill learning effect.

    Science.gov (United States)

    Zha, Hong; Zhang, Lianying

    2014-01-01

    We investigate the project scheduling problem with multiskill learning effect. A new model is proposed to deal with the problem, where both autonomous and induced learning are considered. In order to obtain the optimal solution, a genetic algorithm with specific encoding and decoding schemes is introduced. A numerical example is used to illustrate the proposed model. The computational results show that the learning effect cannot be neglected in project scheduling. By means of determining the level of induced learning, the project manager can balance the project makespan with total cost.

  1. Identification of linear error-models with projected dynamical systems

    Czech Academy of Sciences Publication Activity Database

    Krejčí, Pavel; Kuhnen, K.

    2004-01-01

    Roč. 10, č. 1 (2004), s. 59-91 ISSN 1387-3954 Keywords : identification * error models * projected dynamical systems Subject RIV: BA - General Mathematics Impact factor: 0.292, year: 2004 http://www.informaworld.com/smpp/content~db=all~content=a713682517

  2. Project studies

    DEFF Research Database (Denmark)

    Geraldi, Joana; Söderlund, Jonas

    2018-01-01

    Project organising is a growing field of scholarly inquiry and management practice. In recent years, two important developments have influenced this field: (1) the study and practice of projects have extended their level of analysis from mainly focussing on individual projects to focussing on micro......, and of the explanations of project practices they could offer. To discuss avenues for future research on projects and project practice, this paper suggests the notion of project studies to better grasp the status of our field. We combine these two sets of ideas to analyse the status and future options for advancing...... project research: (1) levels of analysis; and (2) type of research. Analysing recent developments within project studies, we observe the emergence of what we refer to as type 3 research, which reconciles the need for theoretical development and engagement with practice. Type 3 research suggests pragmatic...

  3. Project management for economical nuclear energy

    International Nuclear Information System (INIS)

    Majerle, P.P.

    2005-01-01

    The price of electricity is significantly influenced by the cost of the initial generation asset. The cost of the initial nuclear generation asset is significantly influenced by the design and construction duration. Negative variations in the cost and duration of actual design and construction have historically impacted the early relative economics of nuclear power generation. Successful management of plant design information will mitigate the risks of the design and construction of future nuclear plants. Information management tools that can model the integrated delivery of large complex projects enable the project owners to accurately evaluate project progress, as well as the economic impact of regulatory, political, or market activities not anticipated in the project execution plan. Significant differences exist in the electrical energy markets, project delivery models, and fuel availability between continents and countries. However, each market and project delivery model is challenged by the need to produce economical electrical energy. The information management system presented in this paper provides a means to capture in a single integrated computerized database the design information developed during plant design, procurement, and construction and to allow this information to be updated and retrieved in real time by all project participants. Utilization of the information management system described herein will enable diverse project teams to rapidly and reliably input, share, and retrieve power plant information, thereby supporting project management's goal to make good on its commitment to the economic promise of tomorrow's nuclear electrical power generation by achieving cost-effective construction. (authors)

  4. Projected coupled cluster theory.

    Science.gov (United States)

    Qiu, Yiheng; Henderson, Thomas M; Zhao, Jinmo; Scuseria, Gustavo E

    2017-08-14

    Coupled cluster theory is the method of choice for weakly correlated systems. But in the strongly correlated regime, it faces a symmetry dilemma, where it either completely fails to describe the system or has to artificially break certain symmetries. On the other hand, projected Hartree-Fock theory captures the essential physics of many kinds of strong correlations via symmetry breaking and restoration. In this work, we combine and try to retain the merits of these two methods by applying symmetry projection to broken symmetry coupled cluster wave functions. The non-orthogonal nature of states resulting from the application of symmetry projection operators furnishes particle-hole excitations to all orders, thus creating an obstacle for the exact evaluation of overlaps. Here we provide a solution via a disentanglement framework theory that can be approximated rigorously and systematically. Results of projected coupled cluster theory are presented for molecules and the Hubbard model, showing that spin projection significantly improves unrestricted coupled cluster theory while restoring good quantum numbers. The energy of projected coupled cluster theory reduces to the unprojected one in the thermodynamic limit, albeit at a much slower rate than projected Hartree-Fock.

  5. North Atlantic observations sharpen meridional overturning projections

    Science.gov (United States)

    Olson, R.; An, S.-I.; Fan, Y.; Evans, J. P.; Caesar, L.

    2018-06-01

    Atlantic Meridional Overturning Circulation (AMOC) projections are uncertain due to both model errors, as well as internal climate variability. An AMOC slowdown projected by many climate models is likely to have considerable effects on many aspects of global and North Atlantic climate. Previous studies to make probabilistic AMOC projections have broken new ground. However, they do not drift-correct or cross-validate the projections, and do not fully account for internal variability. Furthermore, they consider a limited subset of models, and ignore the skill of models at representing the temporal North Atlantic dynamics. We improve on previous work by applying Bayesian Model Averaging to weight 13 Coupled Model Intercomparison Project phase 5 models by their skill at modeling the AMOC strength, and its temporal dynamics, as approximated by the northern North-Atlantic temperature-based AMOC Index. We make drift-corrected projections accounting for structural model errors, and for the internal variability. Cross-validation experiments give approximately correct empirical coverage probabilities, which validates our method. Our results present more evidence that AMOC likely already started slowing down. While weighting considerably moderates and sharpens our projections, our results are at low end of previously published estimates. We project mean AMOC changes between periods 1960-1999 and 2060-2099 of -4.0 Sv and -6.8 Sv for RCP4.5 and RCP8.5 emissions scenarios respectively. The corresponding average 90% credible intervals for our weighted experiments are [-7.2, -1.2] and [-10.5, -3.7] Sv respectively for the two scenarios.

  6. Managing wildland fires: integrating weather models into fire projections

    Science.gov (United States)

    Anne M. Rosenthal; Francis Fujioka

    2004-01-01

    Flames from the Old Fire sweep through lands north of San Bernardino during late fall of 2003. Like many Southern California fires, the Old Fire consumed susceptible forests at the urban-wildland interface and spread to nearby city neighborhoods. By incorporating weather models into fire perimeter projections, scientist Francis Fujioka is improving fire modeling as a...

  7. Multiple levels in the organisation of innovation : project organization in single-firm projects and multi-firm projects

    NARCIS (Netherlands)

    Jaspers, F.P.H.; Ende, van den J.C.M.; Borgh, van der W.; Yin, Jie

    2008-01-01

    Studies about how the organization of new product (and new service) development projects (NPD) projects influences project performance typically investigate this in Single-firm projects, i.e. projects with high ownership integration. However, NPD projects are often performed by two or more

  8. A process model for design team communication within fast-track building projects using project websites

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Reymen, I.M.M.J.

    2008-01-01

    The factor time within building projects is on high pressure because of the increasing need for faster delivery of buildings. Within fast track, complex building projects the design process is an important key. Through case analyses offart-hack design processes it became obvious that process and

  9. Process, cost modeling and simulations for integrated project development of biomass for fuel and protein

    International Nuclear Information System (INIS)

    Pannir Selvam, P.V.; Wolff, D.M.B.; Souza Melo, H.N.

    1998-01-01

    The construction of the models for biomass project development are described. These models, first constructed using QPRO electronic spread sheet for Windows, are now being developed with the aid of visual and object oriented program as tools using DELPHI V.1 for windows and process simulator SUPERPRO, V.2.7 Intelligent Inc. These models render the process development problems with economic objectives to be solved very rapidly. The preliminary analysis of cost and investments of biomass utilisation projects which are included for this study are: steam, ammonia, carbon dioxide and alkali pretreatment process, methane gas production using anaerobic digestion process, aerobic composting, ethanol fermentation and distillation, effluent treatments using high rate algae production as well as cogeneration of energy for drying. The main project under developments are the biomass valuation projects with the elephant (Napier) grass, sugar cane bagasse and microalgae, using models for mass balance, equipment and production cost. The sensibility analyses are carried out to account for stochastic variation of the process yield, production volume, price variations, using Monte Carlo method. These models allow the identification of economical and scale up problems of the technology. The results obtained with few preliminary project development with few case studies are reported for integrated project development for fuel and protein using process and cost simulation models. (author)

  10. PERLUASAN IMPLEMENTASI PENDIDIKAN KEWIRAUSAHAAN MODEL PROJECT BASED LEARNING BAGI REMAJA PUTUS SEKOLAH KORBAN GEMPA

    Directory of Open Access Journals (Sweden)

    Moerdiyanto Moerdiyanto

    2012-04-01

    Full Text Available Abstract: Widen Implementation of Entrepreneurship Education Using Project Based Learning Model for Earthquake Victim Drop Out Teenagers. This action research aims at figuring out achievement level of entrepreneurship personalities mastering and business skills held by drop out teenagers after taking part in real business learning experience using Project Based Learning. The population for this study is all of the earthquake victim drop out teenagers in Piyungan, Pleret, and Sewon Bantul Yogyakarta Special Territory.  Interviewed, questionnaire, observation, and documentation are employed to collect data. The results show that entrepreneurship education using Project Based Learning model leads to highly mastering of entrepreneurship personalities (soft skill and highly mastering of business skills (hard skill. Furthermore, through this study Kelompok Usaha Mandiri (Group of Independent Business is created, and then the drop out teenagers can run their own business.   Keyword: business skill, project based learning, soft skill, hard skill   Abstrak: Perluasan Implementasi Pendidikan Kewirausahaan Model Project Based Learning Bagi Remaja Putus Sekolah Korban Gempa. Penelitian ini merupakan penelitian tindakan dengan tujuan untuk mengetahui tingkat keberhasilan penguasaan kepribadian (jiwa kewirausahaan dan keterampilan usaha yang dimiliki Remaja Putus Sekolah (RPS setelah memperoleh pengalaman belajar bisnis riil dengan model Project Based Learning. Populasi dalam penelitian ini adalah semua remaja putus sekolah korban gempa di Kecamatan Piyungan, Kecamatan Pleret, dan Kecamatan Sewon Kabupaten Bantul DIY. Teknik pengumpulan data menggunakan wawancara, angket, observasi, dokumentasi, dan pemberian tugas. Data dianalisis menggunakan teknik deskriptif kuantitatif dan kualitatif. Hasil penelitian menunjukkan bahwa pemberian pendidikan kewirausahaan dengan menggunakan model Project Based Learning bisa berhasil dengan baik yang ditunjukkan dengan

  11. Thresholding projection estimators in functional linear models

    OpenAIRE

    Cardot, Hervé; Johannes, Jan

    2010-01-01

    We consider the problem of estimating the regression function in functional linear regression models by proposing a new type of projection estimators which combine dimension reduction and thresholding. The introduction of a threshold rule allows to get consistency under broad assumptions as well as minimax rates of convergence under additional regularity hypotheses. We also consider the particular case of Sobolev spaces generated by the trigonometric basis which permits to get easily mean squ...

  12. Food for thought: Overconfidence in model projections

    DEFF Research Database (Denmark)

    Brander, Keith; Neuheimer, Anna; Andersen, Ken Haste

    2013-01-01

    There is considerable public and political interest in the state of marine ecosystems and fisheries, but the reliability of some recent projections has been called into question. New information about declining fish stocks, loss of biodiversity, climate impacts, and management failure is frequent...... be reliable and uncertainties arising from models and data shortcomings must be presented fully and transparently. Scientific journals play an important role and should require more detailed analysis and presentation of uncertainties....

  13. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    Science.gov (United States)

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  14. Project financing

    International Nuclear Information System (INIS)

    Alvarez, M.U.

    1990-01-01

    This paper presents the basic concepts and components of the project financing of large industrial facilities. Diagrams of a simple partnership structure and a simple leveraged lease structure are included. Finally, a Hypothetical Project is described with basic issues identified for discussion purposes. The topics of the paper include non-recourse financing, principal advantages and objectives, disadvantages, project financing participants and agreements, feasibility studies, organization of the project company, principal agreements in a project financing, insurance, and an examination of a hypothetical project

  15. Project Notes

    Science.gov (United States)

    School Science Review, 1978

    1978-01-01

    Presents sixteen project notes developed by pupils of Chipping Norton School and Bristol Grammar School, in the United Kingdom. These Projects include eight biology A-level projects and eight Chemistry A-level projects. (HM)

  16. A model for personal life project design on the basis of vocational guidance

    Directory of Open Access Journals (Sweden)

    Isaac Geovanni Mendoza Cedeño

    2015-09-01

    Full Text Available This article is intended to propose a model for developing vocational education personal life projects and its corresponding theoretical foundations. Therefore, the argument is undertaken on the model developed from philosophical views, epistemological, pedagogical, sociological, and psychological axiological, and a model is provided as a basis for the development of vocational education strategy for personal life project development contributing effectively to the development of responsible autonomy and high school students.

  17. Coordinated research projects (CRP). Coordinated research project (CRP)

    International Nuclear Information System (INIS)

    Takagi, Hidekazu; Koike, Fumihiro; Nakamura, Nobuyuki

    2013-01-01

    In the present paper, the contribution of Japanese scientists in coordinated research projects on thermonuclear fusion. Representative subjects taken in seven projects are the precise computation of theoretical data on electron-molecule collisions in the peripheral plasma, the computation of spectroscopic data of multi-charged tungsten ions, the spectroscopic measurement of multi-charged tungsten ions using an ion trap device, the development of collisional-radiative model for plasmas including hydrogen and helium, the computational and theoretical studies on the behavior of tungsten and beryllium in the plasma-wall interaction, the study on the property of dusts generated in fusion devices. These subjects are those of most important issues in ITER. (author)

  18. Models of Financing and Available Financial Resources for Transport Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    O. Pokorná

    2001-01-01

    Full Text Available A typical feature of transport infrastructure projects is that they are expensive and take a long time to construct. Transport infrastructure financing has traditionally lain in the public domain. A tightening of many countries' budgets in recent times has led to an exploration of alternative resources for financing transport infrastructures. A variety of models and methods can be used in transport infrastructure project financing. The selection of the appropriate model should be done taking into account not only financial resources but also the distribution of construction and operating risks and the contractual relations between the stakeholders.

  19. Process-based software project management

    CERN Document Server

    Goodman, F Alan

    2006-01-01

    Not connecting software project management (SPM) to actual, real-world development processes can lead to a complete divorcing of SPM to software engineering that can undermine any successful software project. By explaining how a layered process architectural model improves operational efficiency, Process-Based Software Project Management outlines a new method that is more effective than the traditional method when dealing with SPM. With a clear and easy-to-read approach, the book discusses the benefits of an integrated project management-process management connection. The described tight coup

  20. Project Management and the Project Manager: A Strategy for ...

    African Journals Online (AJOL)

    International Journal of Development and Management Review ... collapse, project failure, project abandonment, project cost and time overruns, etc. ... component parts that constitute project management in the building construction industry.

  1. Contractual Efficiency of PPP Infrastructure Projects: An Incomplete Contract Model

    Directory of Open Access Journals (Sweden)

    Lei Shi

    2018-01-01

    Full Text Available This study analyses the contractual efficiency of public-private partnership (PPP infrastructure projects, with a focus on two financial aspects: the nonrecourse principal and incompleteness of debt contracts. The nonrecourse principal releases the sponsoring companies from the debt contract when the special purpose vehicle (SPV established by the sponsoring companies falls into default. Consequently, all obligations under the debt contract are limited to the liability of the SPV following its default. Because the debt contract is incomplete, a renegotiation of an additional loan between the bank and the SPV might occur to enable project continuation or liquidation, which in turn influences the SPV’s ex ante strategies (moral hazard. Considering these two financial features of PPP infrastructure projects, this study develops an incomplete contract model to investigate how the renegotiation triggers ex ante moral hazard and ex post inefficient liquidation. We derive equilibrium strategies under service fees endogenously determined via bidding and examine the effect of equilibrium strategies on contractual efficiency. Finally, we propose an optimal combination of a performance guarantee, the government’s termination right, and a service fee to improve the contractual efficiency of PPP infrastructure projects.

  2. 3D Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Johansen, Stine Liv; Bach Mikkelsen, Michelle

    2014-01-01

    Three-dimensional projection installations are particular kinds of augmented spaces in which a digital 3-D model is projected onto a physical three-dimensional object, thereby fusing the digital content and the physical object. Based on interaction design research and media studies, this article ...... Fingerplan to Loop City, is a 3-D projection installation presenting the history and future of city planning for the Copenhagen area in Denmark. The installation was presented as part of the 12th Architecture Biennale in Venice in 2010....

  3. Mapping and industrial IT project to a 2nd semester design-build project

    DEFF Research Database (Denmark)

    Nyborg, Mads; Høgh, Stig

    2010-01-01

    CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project in the D......CDIO means bringing the engineer's daily life and working practice into the educational system. In our opinion this is best done by selecting an appropriate project from industry. In this paper we describe how we have mapped an industrial IT project to a 2nd semester design-build project...... in the Diploma IT program at the Technical University of Denmark. The system in question is a weighing system operating in a LAN environment. The system is used in the medical industry for producing tablets. We present the design of a curriculum to support the development of major components of the weighing...... system. A simple teaching model for software engineering is presented which combines technical disciplines with disciplines from section 2-4 in the CDIO syllabus. The implementation of a joint project involving several courses supports the CDIO perspective. Already the traditional IT-diploma education...

  4. Project-oriented management of industrial production of fire and rescue equipment by means of geometric modelling

    OpenAIRE

    Rak, Iu; Bondarenko, V.

    2013-01-01

    Objective: The objective of the research is to develop a method based on the geometric modelling for the purpose of improving the effectiveness of fire protection project management in industrial production of fire protection technology systems. Methods: The theoretical inheritance mode of effective management in project-organizational structure of fire protection and specialized technical equipment production using geometric modelling. Results: Mathematical and geometric models of project ma...

  5. Modelling of Transport Projects Uncertainties

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    2012-01-01

    This paper proposes a new way of handling the uncertainties present in transport decision making based on infrastructure appraisals. The paper suggests to combine the principle of Optimism Bias, which depicts the historical tendency of overestimating transport related benefits and underestimating...... to supplement Optimism Bias and the associated Reference Class Forecasting (RCF) technique with a new technique that makes use of a scenario-grid. We tentatively introduce and refer to this as Reference Scenario Forecasting (RSF). The final RSF output from the CBA-DK model consists of a set of scenario......-based graphs which functions as risk-related decision support for the appraised transport infrastructure project. The presentation of RSF is demonstrated by using an appraisal case concerning a new airfield in the capital of Greenland, Nuuk....

  6. Integration of models for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Napier, B.A.

    1991-01-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation dose that individuals could have received as a result of emissions from nuclear operations at Hanford since 1944. The objective of phase 1 of the project was to demonstrate through calculations that adequate models and support data exist or could be developed to allow realistic estimations of doses to individuals from releases of radionuclides to the environment that occurred as long as 45 years ago. Much of the data used in phase 1 was preliminary; therefore, the doses calculated must be considered preliminary approximations. This paper describes the integration of various models that was implemented for initial computer calculations. Models were required for estimating the quantity of radioactive material released, for evaluating its transport through the environment, for estimating human exposure, and for evaluating resultant doses

  7. Locale-Specific Categorization of IT Projects for Proper Project Management

    Directory of Open Access Journals (Sweden)

    Muhammad Nasir

    2015-12-01

    Full Text Available In this paper we aim to show that not only are the project management techniques important for small-scale projects, but following proper project management techniques is one of the most important requirements. However, there come slight variations in implementing project management techniques in small projects as compared with larger projects. Therefore, proper categorization of projects holds the key to success in many situations. Our paper will show that categorization of a project as small-scale or large-scale should always be locale specific. In this regards, we develop a criteria and evaluate how the projects are categorized as small-scale and large-scale in different parts of the world with focus on IT projects. This research concludes that some methods cannot be used for projects of different scales.

  8. How Healthy Is My Project? Open Source Project Attributes as Indicators of Success

    NARCIS (Netherlands)

    Piggot, James; Amrit, Chintan Amrit; Petrinja, Etiel; Succi, Giancarlo; El Ioini, Nabil; Sillitti, Alberto

    2013-01-01

    Determining what factors can influence the successful outcome of a software project has been labeled by many scholars and software engineers as a difficult problem. In this paper we use machine learning to create a model that can determine the stage a software project has obtained with some

  9. THE PROACTIVE MANAGEMENT MODEL OF STRATEGIC DEVELOPMENT PROJECT ON THE ENERGY SUPPLY COMPANIES IN A TURBULENT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    Михайло Збишекович ДОМБРОВСЬКИЙ

    2017-03-01

    Full Text Available A methodical approach of proactive project management model with the estimate (prediction deviation of actual results from planned at each control step is proposed. Deviation of actual results from the project planned, which takes place in the management of the energy company transformation project, as a result of action under uncertainty, determines the acceleration of work over the project plan. Implementation the scope of work, which exceeds the plan, as result of overspending of resources and budget, disrupting the stability of the project as a system. The graphic model helps to form the "corridor" tolerance based resource reserve, and the implementation of the project work is carried out according to the extension concept. Clarification allowable deviation area allows improving the model of project proactive management for each of the next execution step. Project management quality is improved by reducing the time of decision-making and increase the sustainability and efficiency by substantially reducing deviations. The conclusions about the benefits of the assessment of works and project resources balance, by using the proactive management model, which allows comparing variants of works dynamics, to implement the search for the best solution to a predetermined set of admissible, have been made.

  10. Managing Projects for Change: Contextualised Project Management

    Science.gov (United States)

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  11. Improving Project Portfolio Management (PPM) for Improvement Projects

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Jakobsen, Peter M.; Korsaa, Morten

    2017-01-01

    Project Portfolio Management (PPM) focus on the integration and alignment of projects with the business operation in order to achieve most value and cost-efficiency for the investment in projects. PPM is often a challenge and especially so for improvement projects where PPM is considerably...... of evaluating a portfolio of improvement projects and combine this evaluation with the effect they have on the CMMI maturity level. Further, the paper demonstrates how the combination of a strong senior management requirement for improved maturity and the focus on getting the most value out of PPM made...

  12. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  13. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  14. Projections of Rainfall and Temperature from CMIP5 Models over BIMSTEC Countries

    Science.gov (United States)

    Pattnayak, K. C.; Kar, S. C.; Ragi, A. R.

    2014-12-01

    Rainfall and surface temperature are the most important climatic variables in the context of climate change. Thus, these variables simulated from fifth phase of the Climate Model Inter-comparison Project (CMIP5) models have been compared against Climatic Research Unit (CRU) observed data and projected for the twenty first century under the Representative Concentration Pathways (RCPs) 4.5 and 8.5 emission scenarios. Results for the seven countries under Bay of Bengal Initiative for Multi-Sectoral Technical and Economic Cooperation (BIMSTEC) such as Bangladesh, Bhutan, India, Myanmar, Nepal, Sri Lanka and Thailand have been examined. Six CMIP5 models namely GFDL-CM3, GFDL-ESM2M, GFDL-ESM2G, HadGEM2-AO, HadGEM2-CC and HadGEM2-ES have been chosen for this study. The study period has been considered is from 1861 to 2100. From this period, initial 145 years i.e. 1861 to 2005 is reference or historical period and the later 95 years i.e. 2005 to 2100 is projected period. The climate change in the projected period has been examined with respect to the reference period. In order to validate the models, the mean annual rainfall and temperature has been compared with CRU over the reference period 1901 to 2005. Comparison reveals that most of the models are able to capture the spatial distribution of rainfall and temperature over most of the regions of BIMSTEC countries. Therefore these model data can be used to study the future changes in the 21st Century. Four out six models shows that the rainfall over Central and North India, Thailand and eastern part of Myanmar shows decreasing trend and Bangladesh, Bhutan, Nepal and Sri Lanka shows an increasing trend in both RCP 4.5 and 8.5 scenarios. In case of temperature, all of the models show an increasing trend over all the BIMSTEC countries in both scenarios, however, the rate of increase is relatively less over Sri Lanka than the other countries. Annual cycles of rainfall and temperature over Bangladesh, Myanmar and Thailand

  15. Improvement of the projection models for radiogenic cancer risk

    International Nuclear Information System (INIS)

    Tong Jian

    2005-01-01

    Calculations of radiogenic cancer risk are based on the risk projection models for specific cancer sites. Improvement has been made for the parameters used in the previous models including introductions of mortality and morbidity risk coefficients, and age-/ gender-specific risk coefficients. These coefficients have been applied to calculate the radiogenic cancer risks for specific organs and radionuclides under different exposure scenarios. (authors)

  16. The Veteran Population Projection 2014

    Data.gov (United States)

    Department of Veterans Affairs — VetPop2014 is an actuarial projection model developed by the Office of the Actuary (OACT) for Veteran population projection from Fiscal Year FY2014 to FY2043. Using...

  17. The option to expand a project: its assessment with the binomial options pricing model

    Directory of Open Access Journals (Sweden)

    Salvador Cruz Rambaud

    Full Text Available Traditional methods of investment appraisal, like the Net Present Value, are not able to include the value of the operational flexibility of the project. In this paper, real options, and more specifically the option to expand, are assumed to be included in the project information in addition to the expected cash flows. Thus, to calculate the total value of the project, we are going to apply the methodology of the Net Present Value to the different scenarios derived from the existence of the real option to expand. Taking into account the analogy between real and financial options, the value of including an option to expand is explored by using the binomial options pricing model. In this way, estimating the value of the option to expand is a tool which facilitates the control of the uncertainty element implicit in the project. Keywords: Real options, Option to expand, Binomial options pricing model, Investment project appraisal

  18. Stakeholder approach for evaluating organizational change projects.

    Science.gov (United States)

    Peltokorpi, Antti; Alho, Antti; Kujala, Jaakko; Aitamurto, Johanna; Parvinen, Petri

    2008-01-01

    This paper aims to create a model for evaluating organizational change initiatives from a stakeholder resistance viewpoint. The paper presents a model to evaluate change projects and their expected benefits. Factors affecting the challenge to implement change were defined based on stakeholder theory literature. The authors test the model's practical validity for screening change initiatives to improve operating room productivity. Change initiatives can be evaluated using six factors: the effect of the planned intervention on stakeholders' actions and position; stakeholders' capability to influence the project's implementation; motivation to participate; capability to change; change complexity; and management capability. The presented model's generalizability should be explored by filtering presented factors through a larger number of historical cases operating in different healthcare contexts. The link between stakeholders, the change challenge and the outcomes of change projects needs to be empirically tested. The proposed model can be used to prioritize change projects, manage stakeholder resistance and establish a better organizational and professional competence for managing healthcare organization change projects. New insights into existing stakeholder-related understanding of change project successes are provided.

  19. MODEL OF THE PROJECT – ORIENTED SOCIETY

    Directory of Open Access Journals (Sweden)

    Marian CLIPICI

    2013-12-01

    Full Text Available In many national societies, projects and programmes are performed not only in companies but also in other organizations, such as municipal administrations, associations, schools and ever in families. The globalization of the economy, new technologies with ever-shorter product life cycles and the application of a new management paradigm, characterized by virtual organizations, „empowerment” and knowledge management, promote the use of project and programme management. The article describes the implementation of an integrated waste management in the county of Arges, in accordance with the requirements and provisions of European Community Directives, in order to preserve, protect and improve environmental quality in Arges (project "Integrated management of solid waste in Arges".

  20. Space Synthetic Biology Project

    Science.gov (United States)

    Howard, David; Roman, Monsi; Mansell, James (Matt)

    2015-01-01

    Synthetic biology is an effort to make genetic engineering more useful by standardizing sections of genetic code. By standardizing genetic components, biological engineering will become much more similar to traditional fields of engineering, in which well-defined components and subsystems are readily available in markets. Specifications of the behavior of those components and subsystems can be used to model a system which incorporates them. Then, the behavior of the novel system can be simulated and optimized. Finally, the components and subsystems can be purchased and assembled to create the optimized system, which most often will exhibit behavior similar to that indicated by the model. The Space Synthetic Biology project began in 2012 as a multi-Center effort. The purpose of this project was to harness Synthetic Biology principals to enable NASA's missions. A central target for application was to Environmental Control & Life Support (ECLS). Engineers from NASA Marshall Space Flight Center's (MSFC's) ECLS Systems Development Branch (ES62) were brought into the project to contribute expertise in operational ECLS systems. Project lead scientists chose to pursue the development of bioelectrochemical technologies to spacecraft life support. Therefore, the ECLS element of the project became essentially an effort to develop a bioelectrochemical ECLS subsystem. Bioelectrochemical systems exploit the ability of many microorganisms to drive their metabolisms by direct or indirect utilization of electrical potential gradients. Whereas many microorganisms are capable of deriving the energy required for the processes of interest (such as carbon dioxide (CO2) fixation) from sunlight, it is believed that subsystems utilizing electrotrophs will exhibit smaller mass, volume, and power requirements than those that derive their energy from sunlight. In the first 2 years of the project, MSFC personnel conducted modeling, simulation, and conceptual design efforts to assist the

  1. Tedese Project

    Science.gov (United States)

    Buforn, E.; Davila, J. Martin; Bock, G.; Pazos, A.; Udias, A.; Hanka, W.

    The TEDESE (Terremotos y Deformacion Cortical en el Sur de España) project is a joint project of the Universidad Complutense de Madrid (UCM) and Real Instituto y Observatorio de la Armada de San Fernando, Cadiz (ROA) supported by the Spanish Ministerio de Ciencia y Tecnologia with the participation of the GeoforschungZen- trum, Potsdam (GFZ). The aim is to carry out a study of the characteristics of the oc- currence and mechanism of earthquakes together with measurements of crustal struc- ture and deformations in order to obtain an integrated evaluation of seismic risk in southern Spain from. As part of this project a temporal network of 10 broad-band seismological stations, which will complete those already existing in the zone, have been installed in southern Spain and northern Africa for one year beginning in October 2001. The objectives of the project are the study in detail of the focal mechanisms of earthquakes in this area, of structural in crust and upper mantle, of seismic anisotropy in crust and mantle as indicator for tectonic deformation processed and the measure- ments of crustal deformations using techniques with permanent GPS and SLR stations and temporary GPS surveys. From these studies, seismotectonic models and maps will be elaborated and seismic risk in the zone will be evaluated.

  2. Project-matrix models of marketing organization

    Directory of Open Access Journals (Sweden)

    Gutić Dragutin

    2009-01-01

    Full Text Available Unlike theory and practice of corporation organization, in marketing organization numerous forms and contents at its disposal are not reached until this day. It can be well estimated that marketing organization today in most of our companies and in almost all its parts, noticeably gets behind corporation organization. Marketing managers have always been occupied by basic, narrow marketing activities as: sales growth, market analysis, market growth and market share, marketing research, introduction of new products, modification of products, promotion, distribution etc. They rarely found it necessary to focus a bit more to different aspects of marketing management, for example: marketing planning and marketing control, marketing organization and leading. This paper deals with aspects of project - matrix marketing organization management. Two-dimensional and more-dimensional models are presented. Among two-dimensional, these models are analyzed: Market management/products management model; Products management/management of product lifecycle phases on market model; Customers management/marketing functions management model; Demand management/marketing functions management model; Market positions management/marketing functions management model. .

  3. Innovations in projecting emissions for air quality modeling ...

    Science.gov (United States)

    Air quality modeling is used in setting air quality standards and in evaluating their costs and benefits. Historically, modeling applications have projected emissions and the resulting air quality only 5 to 10 years into the future. Recognition that the choice of air quality management strategy has climate change implications is encouraging longer modeling time horizons. However, for multi-decadal time horizons, many questions about future conditions arise. For example, will current population, economic, and land use trends continue, or will we see shifts that may alter the spatial and temporal pattern of emissions? Similarly, will technologies such as building-integrated solar photovoltaics, battery storage, electric vehicles, and CO2 capture emerge as disruptive technologies - shifting how we produce and use energy - or will these technologies achieve only niche markets and have little impact? These are some of the questions that are being evaluated by researchers within the U.S. EPA’s Office of Research and Development. In this presentation, Dr. Loughlin will describe a range of analytical approaches that are being explored. These include: (i) the development of alternative scenarios of the future that can be used to evaluate candidate management strategies over wide-ranging conditions, (ii) the application of energy system models to project emissions decades into the future and to assess the environmental implications of new technologies, (iii) and methodo

  4. Environmental Science: 49 Science Fair Projects. Science Fair Projects Series.

    Science.gov (United States)

    Bonnet, Robert L.; Keen, G. Daniel

    This book contains 49 science fair projects designed for 6th to 9th grade students. Projects are organized by the topics of soil, ecology (projects in habitat and life cycles), pests and controls (projects in weeds and insects), recycling (projects in resources and conservation), waste products (projects in decomposition), microscopic organisms,…

  5. Coloss project

    International Nuclear Information System (INIS)

    2005-01-01

    The COLOSS project was a shared-cost action, co-ordinated by IRSN within the Euratom Research Framework Programme 1998-2002. Started in February 2000, the project lasted three years. The work-programme performed by 19 partners was shaped around complementary activities aimed at improving severe accident codes. Unresolved risk-relevant issues regarding H2 production, melt generation and the source term were studied, through a large number of experiments such as a) dissolution of fresh and high burn-up UO 2 and MOX by molten Zircaloy, b) simultaneous dissolution of UO 2 and ZrO 2 by molten Zircaloy, c) oxidation of U-O-Zr mixtures by steam, d) degradation-oxidation of B 4 C control rods. Significant results have been produced from separate-effects, semi-global and large-scale tests on COLOSS topics. Break-through were achieved on some issues. Nevertheless, more data are needed for consolidation of the modelling on burn-up effects on UO 2 and MOX dissolution and on oxidation of U-O-Zr and B 4 C-metal mixtures. There was experimental evidence that the oxidation of these mixtures can contribute significantly to the large H2 production observed during the reflooding of degraded cores under severe accident conditions. Based on the experimental results obtained on the COLOSS topics, corresponding models were developed and were successfully implemented in several severe accident codes. Upgraded codes were then used for plant calculations to evaluate the consequences of new models on key severe accident sequences occurring in different plants designs involving B 4 C control rods (EPR, BWR, VVER- 1000) as well as in the TMI-2 accident. The large series of plant calculations involved sensitivity studies and code benchmarks. Main severe accident codes in use in the EU for safety studies were used such as ICARE/CATHARE, SCDAP/RELAP5, ASTEC, MELCOR and MAAP4. This activity enabled: a) the assessment of codes to calculate core degradation, b) the identification of main

  6. Project descriptions

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    This part specifies the activities and project tasks of each project broken down according to types of financing, listing the current projects Lw 1 through 3 funded by long-term provisions (budget), the current projects LB 1 and 2, LG 1 through 5, LK1, LM1, and LU 1 through 6 financed from special funds, and the planned projects ZG 1 through 4 and ZU 1, also financed from special funds. (DG) [de

  7. Development of coupled models and their validation against experiments -DECOVALEX project

    International Nuclear Information System (INIS)

    Stephansson, O.; Jing, L.; Kautsky, F.

    1995-01-01

    DECOVALEX is an international co-operative research project for theoretical and experimental studies of coupled thermal, hydrological and mechanical processes in hard rocks. Different mathematical models and computer codes have been developed by research teams from different countries. These models and codes are used to study the so-called Bench Mark Test and Test Case problems developed within this project. Bench-Mark Tests are defined as hypothetical initial-boundary value problems of a generic nature, and Test Cases are experimental investigations of part or full aspects of coupled thermo-hydro-mechanical processes in hard rocks. Analytical and semi-analytical solutions related to coupled T-H-M processes are also developed for problems with simpler geometry and initial-boundary conditions. These solutions are developed to verify algorithms and their computer implementations. In this contribution the motivation, organization and approaches and current status of the project are presented, together with definitions of Bench-Mark Tests and Test Case problems. The definition and part of results for a BMT problem (BMT3) for a near-field repository model are described as an example. (authors). 3 refs., 11 figs., 3 tabs

  8. Project Communication in Functions, Process and Project-Oriented Industiral Companies

    Science.gov (United States)

    Samáková, Jana; Koltnerová, Kristína; Rybanský, Rudolf

    2012-12-01

    The article is focused on the project communication management. Industrial enterprises, which use project management must constantly search the new ways for improving. One of the possibilities is the change of management from a functional oriented to the projectoriented or process-oriented. Process-oriented and project-oriented companies have better project communication management during the all project life cycle. Communication in the project is a very important factor. According to the arguments of several authors, one of the biggest problem is that threaten the success of the project is just the communication. In each project is an important pillar - and that is communication. Only on the base of communication can the project move forward and achieve the target.

  9. Research Project Evaluation—Learnings from the PATHWAYS Project Experience

    Directory of Open Access Journals (Sweden)

    Aleksander Galas

    2018-05-01

    Full Text Available Background: Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project. The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project’s evaluation issues including: (1 purposes, (2 advisability, (3 tools, (4 implementation, and (5 possible benefits and presents the advantages of a continuous monitoring. Methods: Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S, Weaknesses (W, Opportunities (O, and Threats (SWOT analysis. Results: A methodology for longitudinal EU projects’ evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. Conclusions: There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  10. Using fuzzy logic to improve the project time and cost estimation based on Project Evaluation and Review Technique (PERT

    Directory of Open Access Journals (Sweden)

    Farhad Habibi

    2018-09-01

    Full Text Available Among different factors, correct scheduling is one of the vital elements for project management success. There are several ways to schedule projects including the Critical Path Method (CPM and Program Evaluation and Review Technique (PERT. Due to problems in estimating dura-tions of activities, these methods cannot accurately and completely model actual projects. The use of fuzzy theory is a basic way to improve scheduling and deal with such problems. Fuzzy theory approximates project scheduling models to reality by taking into account uncertainties in decision parameters and expert experience and mental models. This paper provides a step-by-step approach for accurate estimation of time and cost of projects using the Project Evaluation and Review Technique (PERT and expert views as fuzzy numbers. The proposed method included several steps. In the first step, the necessary information for project time and cost is estimated using the Critical Path Method (CPM and the Project Evaluation and Review Technique (PERT. The second step considers the duration and cost of the project activities as the trapezoidal fuzzy numbers, and then, the time and cost of the project are recalculated. The duration and cost of activities are estimated using the questionnaires as well as weighing the expert opinions, averaging and defuzzification based on a step-by-step algorithm. The calculating procedures for evaluating these methods are applied in a real project; and the obtained results are explained.

  11. Project description and crowdfunding success: an exploratory study.

    Science.gov (United States)

    Zhou, Mi Jamie; Lu, Baozhou; Fan, Weiguo Patrick; Wang, G Alan

    2018-01-01

    Existing research on antecedent of funding success mainly focuses on basic project properties such as funding goal, duration, and project category. In this study, we view the process by which project owners raise funds from backers as a persuasion process through project descriptions. Guided by the unimodel theory of persuasion, this study identifies three exemplary antecedents (length, readability, and tone) from the content of project descriptions and two antecedents (past experience and past expertise) from the trustworthy cue of project descriptions. We then investigate their impacts on funding success. Using data collected from Kickstarter, a popular crowdfunding platform, we find that these antecedents are significantly associated with funding success. Empirical results show that the proposed model that incorporated these antecedents can achieve an accuracy of 73 % (70 % in F-measure). The result represents an improvement of roughly 14 percentage points over the baseline model based on informed guessing and 4 percentage points improvement over the mainstream model based on basic project properties (or 44 % improvement of mainstream's performance over informed guessing). The proposed model also has superior true positive and true negative rates. We also investigate the timeliness of project data and find that old project data is gradually becoming less relevant and losing predictive power to newly created projects. Overall, this study provides evidence that antecedents identified from project descriptions have incremental predictive power and can help project owners evaluate and improve the likelihood of funding success.

  12. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    OpenAIRE

    Tamara Gvozdenovic; Mirjana Miljanovic; Aleksandar Jegdic; Zeljko Crnogorcic

    2008-01-01

    One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviatio...

  13. Science in Schools Project

    Science.gov (United States)

    Waugh, Mike

    As part of a program to increase learning and engagement in science classes 124 Victorian schools are trialing a best practice teaching model. The Science in Schools Research Project is a DEET funded project under the Science in Schools Strategy, developed in response to recent research and policy decisions at national and state levels through which literacy, numeracy and science have been identified as key priorities for learning. This major science research project aims to identify, develop and trial best practice in Science teaching and learning. The Department will then be able to provide clear advice to Victoria's schools that can be adopted and sustained to: * enhance teaching and learning of Science * enhance student learning outcomes in Science at all year levels * increase student access to, and participation in Science learning from Prep through to Year 10, and hence in the VCE as well. The nature of the SiS program will be detailed with specific reference to the innovative programs in solar model cars, robotics and environmental science developed at Forest Hill College in response to this project.

  14. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Tamara Gvozdenovic

    2008-03-01

    Full Text Available One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviations from the previously set quality standards. Basic processes of project quality management are: quality planning, quality assurance and quality control.

  15. 40 CFR 258.41 - Project XL Bioreactor Landfill Projects.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Project XL Bioreactor Landfill... WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Design Criteria § 258.41 Project XL Bioreactor Landfill Projects. (a) Buncombe County, North Carolina Project XL Bioreactor Landfill Requirements...

  16. Hardware architecture for projective model calculation and false match refining using random sample consensus algorithm

    Science.gov (United States)

    Azimi, Ehsan; Behrad, Alireza; Ghaznavi-Ghoushchi, Mohammad Bagher; Shanbehzadeh, Jamshid

    2016-11-01

    The projective model is an important mapping function for the calculation of global transformation between two images. However, its hardware implementation is challenging because of a large number of coefficients with different required precisions for fixed point representation. A VLSI hardware architecture is proposed for the calculation of a global projective model between input and reference images and refining false matches using random sample consensus (RANSAC) algorithm. To make the hardware implementation feasible, it is proved that the calculation of the projective model can be divided into four submodels comprising two translations, an affine model and a simpler projective mapping. This approach makes the hardware implementation feasible and considerably reduces the required number of bits for fixed point representation of model coefficients and intermediate variables. The proposed hardware architecture for the calculation of a global projective model using the RANSAC algorithm was implemented using Verilog hardware description language and the functionality of the design was validated through several experiments. The proposed architecture was synthesized by using an application-specific integrated circuit digital design flow utilizing 180-nm CMOS technology as well as a Virtex-6 field programmable gate array. Experimental results confirm the efficiency of the proposed hardware architecture in comparison with software implementation.

  17. Effects of climate model interdependency on the uncertainty quantification of extreme rainfall projections

    DEFF Research Database (Denmark)

    Sunyer Pinya, Maria Antonia; Madsen, H.; Rosbjerg, Dan

    Climate Models (RCMs) and General Circulation Models (GCMs). These multi-model ensembles provide the information needed to estimate probabilistic climate change projections. Several probabilistic methods have been suggested. One common assumption in most of these methods is that the climate models...... are independent. The effects of this assumption on the uncertainty quantification of extreme rainfall projections are addressed in this study. First, the interdependency of the 95% quantile of wet days in the ENSEMBLES RCMs is estimated. For this statistic and the region studied, the RCMs cannot be assumed...

  18. The Agricultural Model Intercomparison and Improvement Project (AgMIP): Protocols and Pilot Studies

    Science.gov (United States)

    Rosenzweig, C.; Jones, J. W.; Hatfield, J. L.; Ruane, A. C.; Boote, K. J.; Thorburn, P.; Antle, J. M.; Nelson, G. C.; Porter, C.; Janssen, S.; hide

    2012-01-01

    The Agricultural Model Intercomparison and Improvement Project (AgMIP) is a major international effort linking the climate, crop, and economic modeling communities with cutting-edge information technology to produce improved crop and economic models and the next generation of climate impact projections for the agricultural sector. The goals of AgMIP are to improve substantially the characterization of world food security due to climate change and to enhance adaptation capacity in both developing and developed countries. Analyses of the agricultural impacts of climate variability and change require a transdisciplinary effort to consistently link state-of-the-art climate scenarios to crop and economic models. Crop model outputs are aggregated as inputs to regional and global economic models to determine regional vulnerabilities, changes in comparative advantage, price effects, and potential adaptation strategies in the agricultural sector. Climate, Crop Modeling, Economics, and Information Technology Team Protocols are presented to guide coordinated climate, crop modeling, economics, and information technology research activities around the world, along with AgMIP Cross-Cutting Themes that address uncertainty, aggregation and scaling, and the development of Representative Agricultural Pathways (RAPs) to enable testing of climate change adaptations in the context of other regional and global trends. The organization of research activities by geographic region and specific crops is described, along with project milestones. Pilot results demonstrate AgMIP's role in assessing climate impacts with explicit representation of uncertainties in climate scenarios and simulations using crop and economic models. An intercomparison of wheat model simulations near Obregón, Mexico reveals inter-model differences in yield sensitivity to [CO2] with model uncertainty holding approximately steady as concentrations rise, while uncertainty related to choice of crop model increases with

  19. Virtual projects

    DEFF Research Database (Denmark)

    Svejvig, Per; Commisso, Trine Hald

    2012-01-01

    that the best practice knowledge has not permeated sufficiently to the practice. Furthermore, the appropriate application of information and communication technology (ICT) remains a big challenge, and finally project managers are not sufficiently trained in organizing and conducting virtual projects....... The overall implications for research and practice are to acknowledge virtual project management as very different to traditional project management and to address this difference.......Virtual projects are common with global competition, market development, and not least the financial crisis forcing organizations to reduce their costs drastically. Organizations therefore have to place high importance on ways to carry out virtual projects and consider appropriate practices...

  20. Physics from angular projection of rectangular grids

    International Nuclear Information System (INIS)

    Singh, Ashmeet

    2015-01-01

    In this paper, we present a mathematical model for the angular projection of a rectangular arrangement of points in a grid. This simple yet interesting, problem has both scholarly value and applications for data extraction techniques to study the physics of various systems. Our work may help undergraduate students to understand subtle points in the angular projection of a grid and describes various quantities of interest in the projection with completeness and sufficient rigour. We show that for certain angular ranges, the projection has non-distinctness, and calculate the details of such angles, and correspondingly, the number of distinct points and the total projected length. We focus on interesting trends obtained for the projected length of the grid elements and present a simple application of the model to determine the geometry of an unknown grid whose spatial extensions are known, using measurement of the grid projection at two angles only. Towards the end, our model is shown to have potential applications in various branches of physical sciences, including crystallography, astrophysics, and bulk properties of materials. (paper)

  1. Allocation of control rights in the PPP Project: a cooperative game model

    Science.gov (United States)

    Zhang, Yunhua; Feng, Jingchun; Yang, Shengtao

    2017-06-01

    Reasonable allocation of control rights is the key to the success of Public-Private Partnership (PPP) projects. PPP are services or ventures which are financed and operated through cooperation between governmental and private sector actors and which involve reasonable control rights sharing between these two partners. After professional firm with capital and technology as a shareholder participating in PPP project firms, the PPP project is diversified in participants and input resources. Meanwhile the allocation of control rights of PPP project tends to be complicated. According to the diversification of participants and input resources of PPP projects, the key participants are divided into professional firms and pure investors. Based on the cost of repurchase of different input resources in markets, the cooperative game relationship between these two parties is analyzed, on the basis of which the allocation model of the cooperative game for control rights is constructed to ensure optimum allocation ration of control rights and verify the share of control rights in proportion to the cost of repurchase.

  2. Exploring Students' Computational Thinking Skills in Modeling and Simulation Projects: : A Pilot Study

    NARCIS (Netherlands)

    Grgurina, Natasa; van Veen, Klaas; Barendsen, Erik; Zwaneveld, Bert; Suhre, Cor; Gal-Ezer, Judith; Sentance, Sue; Vahrenhold, Jan

    2015-01-01

    Computational Thinking (CT) is gaining a lot of attention in education. We explored how to discern the occurrences of CT in the projects of 12th grade high school students in the computer science (CS) course. Within the projects, they constructed models and ran simulations of phenomena from other

  3. Alligator Rivers analogue project

    International Nuclear Information System (INIS)

    Duerden, P.

    1990-01-01

    Australian Nuclear Science and Technology Organization has extensively evaluated uranium ore bodies in the Alligator Rivers Uranium Province in Australia as analogues of radioactive waste repositories. The work was extended for a three-year program as an international project based on the Koongarra uranium deposit and sponsored by the OECD Nuclear Energy Agency. The technical program comprises six major sub-projects involving modelling and experimental work: modelling of radionuclide migration; hydrogeology of the Koongarra uranium deposit; uranium/thorium series disequilibria studies; groundwater and colloid studies; fission product studies; transuranic nuclide studies; an outline of the technical programs and a summary of progress in the technical sub-projects is given. This is followed by a series of technical reports which briefly describe current research tasks, and which have been separately indexed

  4. Modeling water flow and solute transport in unsaturated zone inside NSRAWD project

    International Nuclear Information System (INIS)

    Constantin, A.; Diaconu, D.; Bucur, C.; Genty, A.

    2015-01-01

    The NSRAWD project (2010-2013) - Numerical Simulations for Radioactive Waste Disposal was initiated under a collaboration agreement between the Institute for Nuclear Research and the French Alternative Energies and Atomic Energy Commission (CEA). The context of the project was favorable to combine the modeling activities with an experimental part in order to improve and validate the numerical models used so far to simulate water flow and solute transport at Saligny site, Romania. The numerical models developed in the project were refined and validated on new hydrological data gathered between 2010-2012 by a monitoring station existent on site which performs automatic determination of soil water content and matrix potential, as well as several climate parameters (wind, temperature and precipitations). Water flow and solute transport was modeled in transient conditions, by taking into consideration, as well as neglecting the evapotranspiration phenomenon, on the basis of a tracer test launched on site. The determination of dispersivities for solute transport was targeted from the solute plume. The paper presents the main results achieved in the NSRAWD project related to water flow and solute transport in the unsaturated area of the Saligny site. The results indicated satisfactory predictions for the simulation of water flow in the unsaturated area, in steady state and transient conditions. In the case of tracer transport modeling, dispersivity coefficients could not be finally well fitted for the data measured on site and in order to obtain a realistic preview over the values of these parameters, further investigations are recommended. The article is followed by the slides of the presentation

  5. Project development symposium

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    Papers were presented on the following: project evaluation; case studies - minerals; finance; applied finance; legal; manpower/industrial relations; and new technologies. Those papers on the coal industry were: mine planning for coal project development; the planning and management of a lignite exploration contract in Thailand; development of the West Cliff extended project; Ulan: a resource development; Saxonvale mine development a case study in project planning and project management; the role of marketing in the development of a new coal project; technical support for coal marketing; infrastructure development for the Ulan project; underground mine project developments; the bucketwheel excavator at Goonyella - a case study; tax aspects of mining development projects; cost of capital mining development projects; and trends in development project finance. 16 papers were abstracted separately.

  6. [''R"--project for statistical computing

    DEFF Research Database (Denmark)

    Dessau, R.B.; Pipper, Christian Bressen

    2008-01-01

    An introduction to the R project for statistical computing (www.R-project.org) is presented. The main topics are: 1. To make the professional community aware of "R" as a potent and free software for graphical and statistical analysis of medical data; 2. Simple well-known statistical tests are fai...... are fairly easy to perform in R, but more complex modelling requires programming skills; 3. R is seen as a tool for teaching statistics and implementing complex modelling of medical data among medical professionals Udgivelsesdato: 2008/1/28......An introduction to the R project for statistical computing (www.R-project.org) is presented. The main topics are: 1. To make the professional community aware of "R" as a potent and free software for graphical and statistical analysis of medical data; 2. Simple well-known statistical tests...

  7. Modern project management theory and knowledge framework

    Institute of Scientific and Technical Information of China (English)

    Luo Zhongbao

    2014-01-01

    The scholars increasingly pay at ention to the internal rules in knowledge development and innovation of construction engineering management,as wel as the framework for engineering management body of knowledge. Considering the one-of-a-kind characteristic of construction project s and highly dependence from projects on management knowledge and its innovation,this paper analyzed the knowledge body of engineering management and its development dimension ,such as thinking and knowledge structure dimensions. The engineering management knowledge innovation model and structural model were put forward. The paper reviewed and proposed the engineering management knowledge system framework under engineering thinking mode,including the basic knowledge system framework which is used in engineering management research ,and a framework for body of knowledge which is applicable for engineering management practice. Based on a brief analysis of engineering management practice,this paper analyzed the development progres of engineering management from engineering thinking to ethical thinking and philosophical thinking. A dynamic model formed from the modern engineering management theory was put forward. The construction of projects are divided into two stages:an investment decision-making stage, and project implementation stage. According to the fact that project owners obtain the project products by transaction,the management during project implementation stage are divided into two aspects:project transaction management for the owner, and construction project management for the contractor. Thus, the three theoretical modules of modern engineering management were established:project investment decision-making management theory,engineering transaction management theory, and engineering project management theory. This paper further analyzed the content and basic theoretical issues of each theoretical module.

  8. Project Temporalities

    DEFF Research Database (Denmark)

    Tryggestad, Kjell; Justesen, Lise; Mouritsen, Jan

    2013-01-01

    Purpose – The purpose of this paper is to explore how animals can become stakeholders in interaction with project management technologies and what happens with project temporalities when new and surprising stakeholders become part of a project and a recognized matter of concern to be taken...... into account. Design/methodology/approach – The paper is based on a qualitative case study of a project in the building industry. The authors use actor-network theory (ANT) to analyze the emergence of animal stakeholders, stakes and temporalities. Findings – The study shows how project temporalities can...... multiply in interaction with project management technologies and how conventional linear conceptions of project time may be contested with the emergence of new non-human stakeholders and temporalities. Research limitations/implications – The study draws on ANT to show how animals can become stakeholders...

  9. Models of Charity Donations and Project Funding in Social Networks

    Science.gov (United States)

    Wojciechowski, Adam

    One of the key fundaments of building a society is common interest or shared aims of the group members. This research work is a try to analyze web-based services oriented towards money collection for various social and charity projects. The phenomenon of social founding is worth a closer look at because its success strongly depends on the ability to build an ad-hoc or persistent groups of people sharing their believes and willing to support external institutions or individuals. The paper presents a review of money collection sites, various models of donation and money collection process as well as ways how the projects' results are reported to their founders. There is also a proposal of money collection service, where donators are not charged until total declared help overheads required resources to complete the project. The risk of missing real donations for declared payments, after the collection is closed, can be assessed and minimized by building a social network.

  10. Symmetry-projected variational approach to the one-dimensional Hubbard model

    International Nuclear Information System (INIS)

    Schmid, K.W.; Dahm, T.; Margueron, J.; Muether, H.

    2005-01-01

    We apply a variational method devised for the nuclear many-body problem to the one-dimensional Hubbard model with nearest neighbor hopping and periodic boundary conditions. The test wave function consist for each state out of a single Hartree-Fock determinant mixing all the sites (or momenta) as well as the spin projections of the electrons. Total spin and linear momentum are restored by projection methods before the variation. It is demonstrated that this approach reproduces the results of exact diagonalizations for half-filled N=12 and N=14 lattices not only for the energies and occupation numbers of the ground but also of the lowest excited states rather well. Furthermore, a system of ten electrons in an N=12 lattice is investigated and, finally, an N=30 lattice is studied. In addition to energies and occupation numbers we present the spectral functions computed with the help of the symmetry-projected wave functions as well

  11. Understanding Applications of Project Planning and Scheduling in Construction Projects

    OpenAIRE

    AlNasseri, Hammad Abdullah

    2015-01-01

    Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholders’ needs. However, there is increasing concern about whether know-how effectively improves understanding of underlying theories of project management processes for construction organizations and their project managers. Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance, but many worldwide constru...

  12. Visualizing projected Climate Changes - the CMIP5 Multi-Model Ensemble

    Science.gov (United States)

    Böttinger, Michael; Eyring, Veronika; Lauer, Axel; Meier-Fleischer, Karin

    2017-04-01

    Large ensembles add an additional dimension to climate model simulations. Internal variability of the climate system can be assessed for example by multiple climate model simulations with small variations in the initial conditions or by analyzing the spread in large ensembles made by multiple climate models under common protocols. This spread is often used as a measure of uncertainty in climate projections. In the context of the fifth phase of the WCRP's Coupled Model Intercomparison Project (CMIP5), more than 40 different coupled climate models were employed to carry out a coordinated set of experiments. Time series of the development of integral quantities such as the global mean temperature change for all models visualize the spread in the multi-model ensemble. A similar approach can be applied to 2D-visualizations of projected climate changes such as latitude-longitude maps showing the multi-model mean of the ensemble by adding a graphical representation of the uncertainty information. This has been demonstrated for example with static figures in chapter 12 of the last IPCC report (AR5) using different so-called stippling and hatching techniques. In this work, we focus on animated visualizations of multi-model ensemble climate projections carried out within CMIP5 as a way of communicating climate change results to the scientific community as well as to the public. We take a closer look at measures of robustness or uncertainty used in recent publications suitable for animated visualizations. Specifically, we use the ESMValTool [1] to process and prepare the CMIP5 multi-model data in combination with standard visualization tools such as NCL and the commercial 3D visualization software Avizo to create the animations. We compare different visualization techniques such as height fields or shading with transparency for creating animated visualization of ensemble mean changes in temperature and precipitation including corresponding robustness measures. [1] Eyring, V

  13. A River Model Intercomparison Project in Preparation for SWOT

    Science.gov (United States)

    David, C. H.; Andreadis, K.; Famiglietti, J. S.; Beighley, E.; Boone, A. A.; Yamazaki, D.; Paiva, R. C. D.; Fleischmann, A. S.; Collischonn, W.; Fisher, C. K.; Kim, H.; Biancamaria, S.

    2017-12-01

    The Surface Water and Ocean Topography (SWOT) mission is currently scheduled to launch at the beginning of next decade. SWOT is expected to retrieve unprecedented measurements of water extent, elevation, and slope in the largest terrestrial water bodies. Such potential transformative information motivates the investigation of our ability to ingest the associated data into continental-scale models of terrestrial hydrology. In preparation for the expected SWOT observations, an inter-comparison of continental-scale river models is being performed. This comparison experiment focuses on four of the world's largest river basins: the Amazon, the Mississippi, the Niger, and the Saint-Lawrence. This ongoing project focuses on two main research questions: 1) How can we best prepare for the expected SWOT continental to global measurements before SWOT even flies?, and 2) What is the added value of including SWOT terrestrial measurements into global hydro models for enhancing our understanding of the terrestrial water cycle and the climate system? We present here the results of the second year of this project which now includes simulations from six numerical models of rivers over the Mississippi and sheds light on the implications of various modeling choices on simulation quality as well as on the potential impact of SWOT observations.

  14. Organizational Diagnosis in Project-Based Companies

    Directory of Open Access Journals (Sweden)

    Behrouz Zarei

    2014-05-01

    Full Text Available The purpose of this article is to develop a new method for corporate diagnosis (CD. To this end, a method is developed for the diagnosis process of project-based companies. The article presents a case study in a large company where data have been collected through focus groups. Project delay, high project cost, and low profitability are examples of project deficiency in project-based companies. Such issues have made managers pay special attention to find effective solutions to improve them. Prominent factors are inappropriate strategy, structure, system, human resource management, and PMBOK(Project Management Body of Knowledge processes. Thus, CD and analysis is an important task in improvement of corporate performance. The CD model that is developed in this article could be used for project-based companies. The proposed method can be used for CD in any project-based company. This article provides an emphatic application of CD as a prerequisite for restructuring in project-based companies.

  15. Projection of future transport energy demand of Thailand

    International Nuclear Information System (INIS)

    Limanond, Thirayoot; Jomnonkwao, Sajjakaj; Srikaew, Artit

    2011-01-01

    The objective of this study is to project transport energy consumption in Thailand for the next 20 years. The study develops log-linear regression models and feed-forward neural network models, using the as independent variables national gross domestic product, population and the numbers of registered vehicles. The models are based on 20-year historical data between years 1989 and 2008, and are used to project the trends in future transport energy consumption for years 2010-2030. The final log-linear models include only gross domestic product, since all independent variables are highly correlated. It was found that the projection results of this study were in the range of 54.84-59.05 million tonnes of oil equivalent, 2.5 times the 2008 consumption. The projected demand is only 61-65% of that predicted in a previous study, which used the LEAP model. This major discrepancy in transport energy demand projections suggests that projects related to this key indicator should take into account alternative projections, because these numbers greatly affect plans, policies and budget allocation for national energy management. - Research highlights: → Thailand transport energy consumption would increase to 54.4-59.1 MTOE in Year 2030. → The log-linear models yield a slightly higher projection than the ANN models. → The elasticity of transport energy demand with respect to GDP is 0.995.

  16. Projection of future transport energy demand of Thailand

    Energy Technology Data Exchange (ETDEWEB)

    Limanond, Thirayoot, E-mail: tlimanond@yahoo.co [School of Transportation Engineering, Institute of Engineering, Suranaree University of Technology, Nakhon Ratchasima 30000 (Thailand); Jomnonkwao, Sajjakaj [School of Transportation Engineering, Institute of Engineering, Suranaree University of Technology, Nakhon Ratchasima 30000 (Thailand); Srikaew, Artit [School of Electrical Engineering, Institute of Engineering, Suranaree University of Technology, Nakhon Ratchasima 30000 (Thailand)

    2011-05-15

    The objective of this study is to project transport energy consumption in Thailand for the next 20 years. The study develops log-linear regression models and feed-forward neural network models, using the as independent variables national gross domestic product, population and the numbers of registered vehicles. The models are based on 20-year historical data between years 1989 and 2008, and are used to project the trends in future transport energy consumption for years 2010-2030. The final log-linear models include only gross domestic product, since all independent variables are highly correlated. It was found that the projection results of this study were in the range of 54.84-59.05 million tonnes of oil equivalent, 2.5 times the 2008 consumption. The projected demand is only 61-65% of that predicted in a previous study, which used the LEAP model. This major discrepancy in transport energy demand projections suggests that projects related to this key indicator should take into account alternative projections, because these numbers greatly affect plans, policies and budget allocation for national energy management. - Research highlights: {yields} Thailand transport energy consumption would increase to 54.4-59.1 MTOE in Year 2030. {yields} The log-linear models yield a slightly higher projection than the ANN models. {yields} The elasticity of transport energy demand with respect to GDP is 0.995.

  17. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    International Nuclear Information System (INIS)

    Lee, Kwang Ho; Roh, Myung Sub

    2013-01-01

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors

  18. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kwang Ho; Roh, Myung Sub [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2013-10-15

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors.

  19. Project Portfolio Risk Identification and Analysis, Considering Project Risk Interactions and Using Bayesian Networks

    Directory of Open Access Journals (Sweden)

    Foroogh Ghasemi

    2018-05-01

    Full Text Available An organization’s strategic objectives are accomplished through portfolios. However, the materialization of portfolio risks may affect a portfolio’s sustainable success and the achievement of those objectives. Moreover, project interdependencies and cause–effect relationships between risks create complexity for portfolio risk analysis. This paper presents a model using Bayesian network (BN methodology for modeling and analyzing portfolio risks. To develop this model, first, portfolio-level risks and risks caused by project interdependencies are identified. Then, based on their cause–effect relationships all portfolio risks are organized in a BN. Conditional probability distributions for this network are specified and the Bayesian networks method is used to estimate the probability of portfolio risk. This model was applied to a portfolio of a construction company located in Iran and proved effective in analyzing portfolio risk probability. Furthermore, the model provided valuable information for selecting a portfolio’s projects and making strategic decisions.

  20. Computer Hardware, Advanced Mathematics and Model Physics pilot project final report

    International Nuclear Information System (INIS)

    1992-05-01

    The Computer Hardware, Advanced Mathematics and Model Physics (CHAMMP) Program was launched in January, 1990. A principal objective of the program has been to utilize the emerging capabilities of massively parallel scientific computers in the challenge of regional scale predictions of decade-to-century climate change. CHAMMP has already demonstrated the feasibility of achieving a 10,000 fold increase in computational throughput for climate modeling in this decade. What we have also recognized, however, is the need for new algorithms and computer software to capitalize on the radically new computing architectures. This report describes the pilot CHAMMP projects at the DOE National Laboratories and the National Center for Atmospheric Research (NCAR). The pilot projects were selected to identify the principal challenges to CHAMMP and to entrain new scientific computing expertise. The success of some of these projects has aided in the definition of the CHAMMP scientific plan. Many of the papers in this report have been or will be submitted for publication in the open literature. Readers are urged to consult with the authors directly for questions or comments about their papers

  1. Using UML Modeling to Facilitate Three-Tier Architecture Projects in Software Engineering Courses

    Science.gov (United States)

    Mitra, Sandeep

    2014-01-01

    This article presents the use of a model-centric approach to facilitate software development projects conforming to the three-tier architecture in undergraduate software engineering courses. Many instructors intend that such projects create software applications for use by real-world customers. While it is important that the first version of these…

  2. MARKET ENTRY STRATEGIES TO EMERGING MARKETS: A CONCEPTUAL MODEL OF TURNKEY PROJECT DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    Bistra Vassileva

    2016-11-01

    Full Text Available The main purpose of the paper is to analyse the international market entry strategies in the light of globalisation processes and to propose a conceptual model of turnkey projects as market entry mode. The specific research objectives are as follows: 1. to develop an integrated framework of the turnkey marketing process as a conceptual model; 2. to analyse BRICS countries as potential host countries for turnkey projects implementation; 3. to assess potential implications of proposed conceptual model for global market entry decisions.

  3. Design of a projection display screen with vanishing color shift for rear-projection HDTV

    Science.gov (United States)

    Liu, Xiu; Zhu, Jin-lin

    1996-09-01

    Using bi-convex cylinder lens with matrix structure, the transmissive projection display screen with high contrast and wider viewing angle has been widely used in large rear projection TV and video projectors, it obtained a inhere color shift and puzzled the designer of display screen for RGB projection tube in-line adjustment. Based on the method of light beam racing, the general software of designing projection display screen has been developed and the computer model of vanishing color shift for rear projection HDTV has bee completed. This paper discussed the practical designing method to vanish the defect of color shift and mentioned the relations between the primary optical parameters of display screen and relative geometry sizes of lens' surface. The distributions of optical gain to viewing angle and the influences on engineering design are briefly analyzed.

  4. Project Management

    DEFF Research Database (Denmark)

    Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015.......Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015....

  5. Quantitative Decision Making Model for Carbon Reduction in Road Construction Projects Using Green Technologies

    Directory of Open Access Journals (Sweden)

    Woosik Jang

    2015-08-01

    Full Text Available Numerous countries have established policies for reducing greenhouse gas emissions and have suggested goals pertaining to these reductions. To reach the target reduction amounts, studies on the reduction of carbon emissions have been conducted with regard to all stages and processes in construction projects. According to a study on carbon emissions, the carbon emissions generated during the construction stage of road projects account for approximately 76 to 86% of the total carbon emissions, far exceeding the other stages, such as maintenance or demolition. Therefore, this study aims to develop a quantitative decision making model that supports the application of green technologies (GTs to reduce carbon emissions during the construction stage of road construction projects. First, the authors selected environmental soundness, economic feasibility and constructability as the key assessment indices for evaluating 20 GTs. Second, a fuzzy set/qualitative comparative analysis (FS/QCA was used to establish an objective decision-making model for the assessment of both the quantitative and qualitative characteristics of the key indices. To support the developed model, an expert survey was performed to assess the applicability of each GT from a practical perspective, which was verified with a case study using two additional GTs. The proposed model is expected to support practitioners in the application of suitable GTs to road projects and reduce carbon emissions, resulting in better decision making during road construction projects.

  6. Storytelling in Projects

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas; Andersen, Peter Bøgh

    2006-01-01

    project managers should not only be concerned with project plans, but also with project stories. In this paper we explore some basic principles for transforming project plans into appealing stories. We discuss what may happen to stories once they are released into public space. And we illustrate how......Plans and stories are two different ways of communicating about projects. Project plans are formalized descriptions, primarily supporting coordination. Project stories are accounts whose primary function is emotional appeal. Project stories influence the projects’ chances of success. Therefore...... the possibilities of telling favorable stories may have repercussions on the project planning....

  7. Radioactive waste management. International projects on biosphere modelling

    International Nuclear Information System (INIS)

    Carboneras, P.; Cancio, D.

    1993-01-01

    The paper presents a general overview and discussion on the state of art concerning the biospheric transfer and accumulation of contaminants. A special emphasis is given to the progress achieved in the field of radioactive contaminants and particularly to those implied in radioactive waste disposal. The objectives and advances of the international projects BIOMOVS and VAMP on validation of model predictions are also described. (Author)

  8. An Application of the PMI Model at the Project Level: Evaluation of the ESEA Title IV C Fresh Start Minischool Project.

    Science.gov (United States)

    Harrison, Patricia C.

    The Planning, Monitoring, and Implementation Model (PMI) was developed to provide a model for systematic evaluation of educational programs to determine their effectiveness in achieving goals and objectives. This paper demonstrates the applicability of the PMI model at the project level. Fresh Start Minischool at Ballou High School (District of…

  9. IS-ENES project management - lessons learnt

    Science.gov (United States)

    Parinet, Marie; Guglielmo, Francesca; Joussaume, Sylvie

    2017-04-01

    IS-ENES is the distributed e-infrastructure of models, model data and metadata of the European Network for Earth System Modelling (ENES). It has benefitted from two EC FP7 grants and aims towards further European and national funding to achieve sustainability. We highlight here several challenges related to project management that have risen in the course of these two project-phases spanning 8 years. Some challenges are related to the heterogeneity of the activities within IS-ENES, with different groups working on very diverse activities, not necessarily strictly interdependent. An immediate consequence is the need of implementing and setting up in early phases of the project efficient collection and circulation of information to preserve and reinforce the systemic view of the infrastructure as a whole and the pursuit of common goals, including coordinated provision of services. Toward and beyond such common goals, managing IS-ENES, covering both scientific and more strictly management-related aspects, implies a double-paced approach: besides setting up efficient project workflow, there is the need of setting up longer term objectives. This implies, within the project lifetime, to elaborate and implement a coherent organizational (consistent with scientific goals, funding schemes, research and technology landscape) strategy to pursue these goals beyond the project itself. Furthermore, a series of more generic project management challenges will also be listed and can be gathered around 3 main objectives: ease the internal processes in order to optimize the work, anticipate delays and budget issues, and motivate the project teams by ensuring an efficient internal and external communication.

  10. Atmospheric transport and dispersion modeling for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Ramsdell, J.V.

    1991-07-01

    Radiation doses that may have resulted from operations at the Hanford Site are being estimated in the Hanford Environmental Dose Reconstruction (HEDR) Project. One of the project subtasks, atmospheric transport, is responsible for estimating the transport, diffusion and deposition of radionuclides released to the atmosphere. This report discusses modeling transport and diffusion in the atmospheric pathway. It is divided into three major sections. The first section of the report presents the atmospheric modeling approach selected following discussion with the Technical Steering Panel that directs the HEDR Project. In addition, the section discusses the selection of the MESOI/MESORAD suite of atmospheric dispersion models that form the basis for initial calculations and future model development. The second section of the report describes alternative modeling approaches that were considered. Emphasis is placed on the family of plume and puff models that are based on Gaussian solution to the diffusion equations. The final portion of the section describes the performance of various models. The third section of the report discusses factors that bear on the selection of an atmospheric transport modeling approach for HEDR. These factors, which include the physical setting of the Hanford Site and the available meteorological data, serve as constraints on model selection. Five appendices are included in the report. 39 refs., 4 figs., 2 tabs

  11. Use of System Dynamics Modeling in Medical Education and Research Projects.

    Science.gov (United States)

    Bozikov, Jadranka; Relic, Danko; Dezelic, Gjuro

    2018-01-01

    The paper reviews experiences and accomplishments in application of system dynamics modeling in education, training and research projects at the Andrija Stampar School of Public Health, a branch of the Zagreb University School of Medicine, Croatia. A number of simulation models developed over the past 40 years are briefly described with regard to real problems concerned, objectives and modeling methods and techniques used. Many of them have been developed as the individual students' projects as a part of their graduation, MSc or PhD theses and subsequently published in journals or conference proceedings. Some of them were later used in teaching and simulation training. System dynamics modeling proved to be not only powerful method for research and decision making but also a useful tool in medical and nursing education enabling better understanding of dynamic systems' behavior.

  12. Experiences of project developers around CDM projects in South Africa

    International Nuclear Information System (INIS)

    Thurner, Thomas W.; Varughese, Arun

    2013-01-01

    Project developers in South Africa are puzzled with the long process of evaluating and registering their CDM projects. In addition to other obstacles, we find that South African big businesses are rather reluctant to engage in any new business activities such as CDM projects and municipalities often lack the necessary flexibility. This offers opportunities for small-scale project developers who spot the opportunities and find creative solutions to overcome these difficulties. - Highlights: • First paper analysing the experience of small project developers in South Africa. • Project developers in South Africa are puzzled with the long process. • South African big businesses are reluctant to engage in CDM projects. • Small-scale project developers spot opportunities and find creative solutions to overcome difficulties. • Also, we saw learning processes of South African administration in support of CDM projects

  13. Sun light European Project

    Science.gov (United States)

    Soubielle, Marie-Laure

    2015-04-01

    innovative devices. Outcome: In this project students will carry out various experiments to have a better optical understanding of sunlight. They will shoot tutorials and use these experiments to make a digital pen. Solar Impulse Project Model aircraft Technology, Electricity and English project Context : Solar Impulse is a solar plane that flew around the world with no stop using only the energy of the solar cells situated on its wings. The plane only requires an external source energy for take off unlike gliders. The pilot in the cockpit is one of the conception engineers. The plane can store enough energy for an 8-hour night flight. Outcome : This project will create a tutorial and a model aircraft of the plane Solar Impulse with solar cells providing energy for 4 engines, batteries, LED lighting and a tension reader. This plane will not fly.

  14. Effects of Business Model Development Projects on Organizational Culture: A Multiple Case Study of SMEs

    Directory of Open Access Journals (Sweden)

    Ulla Santti

    2017-08-01

    Full Text Available Previous research has shown that links between organizational culture and innovativeness/performance may act as a “social glue” that helps a company develop organizational culture as a competitive advantage. In this study of three case companies, the organizational culture change due business model development projects is studied using the Competing Values Framework (CVF tool and interviews with respondents about discovered changes. To reveal intervention and implied effects between business model development project and organizational culture changes, we used CIMO logic (context, intervention, mechanism, and outcome to bridge practice and theory by explanatory, backward-looking research. Our case studies of companies in relatively short-duration business model development projects indicate that organizational culture may have some dynamic characteristics, for example, an increase of the adhocracy organizational type in all case companies or an increase in the hierarchical leadership type in one case company. Thus, the development of an organizational culture type can be partly controlled. Our results also indicated business model development projects do have a minor effect on organizational culture, even when development activities have not been put fully into practice. However, the more comprehensively business model development project activities have been put into practice, the larger the effect on organizational culture.

  15. MATCHING CONFIGURATIONS PROJECTS OF COOPERATIVE MILK COLLECTION PROJECT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    Анатолій Миколайович ТРИГУБА

    2017-03-01

    Full Text Available The condition analysis of dairy farming is done and the reasons for its degradation are revealed. The need of technologically integrated production systems projects, harvesting, and processing of milk are substantiated. A scientific methodology and the method of project design of milk provision cooperative coordination in the community of the project environment, which are based on systematic-evaluative approach and simulation are proposed. The criterion for the definition of rational parameters of objects configuration for milk provision cooperative projects in the community system is the maximum value of their product. The monetary functioning assessment of the configuration object of cooperative milk provision projects in the community is done. On the basis of the proposed method, we performed the coordination of project configuration of milk provision cooperative with the project environment of territory Zabolotsi community in Brody district of Lviv region.

  16. МULTI-STAKEHOLDER MODEL OF EDUCATION PROJECT QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Юлия Юрьевна ГУСЕВА

    2015-05-01

    Full Text Available The analysis of approaches to the definition of higher education projects’ stakeholders is conducted. A model of education project quality management with the influence of stakeholders is formed. A mechanism of recognition of new groups of project’s stakeholders on the basis of set theory is offered.

  17. Effects of climate model interdependency on the uncertainty quantification of extreme reinfall projections

    DEFF Research Database (Denmark)

    Sunyer Pinya, Maria Antonia; Madsen, H.; Rosbjerg, Dan

    are independent. This study investigates the validity of this assumption and its effects on the estimated probabilistic projections of the changes in the 95% quantile of wet days. The methodology is divided in two main parts. First, the interdependency of the ENSEMBLES RCMs is estimated using the methodology...... developed by Pennell and Reichler (2011). The results show that the projections from the ENSEMBLES RCMs cannot be assumed independent. This result is then used to estimate the uncertainty in climate model projections. A Bayesian approach has been developed using the procedure suggested by Tebaldi et al...

  18. Effects of climate model interdependency on the uncertainty quantification of extreme rainfall projections

    DEFF Research Database (Denmark)

    Sunyer, M. A.; Rosbjerg, Dan; Arnbjerg-Nielsen, Karsten

    2017-01-01

    are independent. This study investigates the validity of this assumption and its effects on the estimated probabilistic projections of the changes in the 95% quantile of wet days. The methodology is divided in two main parts. First, the interdependency of the ENSEMBLES RCMs is estimated using the methodology...... developed by Pennell and Reichler (2011). The results show that the projections from the ENSEMBLES RCMs cannot be assumed independent. This result is then used to estimate the uncertainty in climate model projections. A Bayesian approach has been developed using the procedure suggested by Tebaldi et al...

  19. Define Project

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas

    2005-01-01

    "Project" is a key concept in IS management. The word is frequently used in textbooks and standards. Yet we seldom find a precise definition of the concept. This paper discusses how to define the concept of a project. The proposed definition covers both heavily formalized projects and informally...... organized, agile projects. Based on the proposed definition popular existing definitions are discussed....

  20. Project Compliance with Enterprise Architecture

    NARCIS (Netherlands)

    Foorthuis, R.M.

    2012-01-01

    This research project set out to identify effective practices and models for working with projects that are required to comply with Enterprise Architecture (EA), and investigate the benefits and drawbacks brought about by compliance. Research methods used are canonical action research, a statistical

  1. A pilot project on non-conventional learning

    OpenAIRE

    Fernandes, Sara; Cerone, Antonio; Barbosa, L. S.

    2013-01-01

    This poster presents a pilot project on non-conventional learning strategies based on students’ active participation in real-life FLOSS projects. The aim of the project is to validate the hypothesis that the peer-production model, which underlies most FLOSS projects, can enhance the learning-teaching process based on extensive and systematic collaborative practices.

  2. Make-up wells drilling cost in financial model for a geothermal project

    Science.gov (United States)

    Oktaviani Purwaningsih, Fitri; Husnie, Ruly; Afuar, Waldy; Abdurrahman, Gugun

    2017-12-01

    After commissioning of a power plant, geothermal reservoir will encounter pressure decline, which will affect wells productivity. Therefore, further drilling is carried out to enhance steam production. Make-up wells are production wells drilled inside an already confirmed reservoir to maintain steam production in a certain level. Based on Sanyal (2004), geothermal power cost consists of three components, those are capital cost, O&M cost and make-up drilling cost. The make-up drilling cost component is a major part of power cost which will give big influence in a whole economical value of the project. The objective of this paper it to analyse the make-up wells drilling cost component in financial model of a geothermal power project. The research will calculate make-up wells requirements, drilling costs as a function of time and how they influence the financial model and affect the power cost. The best scenario in determining make-up wells strategy in relation with the project financial model would be the result of this research.

  3. VALUES-ORIENTED PROJECT MANAGEMENT OF RENEWABLE ENERGY

    Directory of Open Access Journals (Sweden)

    Олександр Михайлович ВОЗНИЙ

    2017-03-01

    Full Text Available The value-oriented approach to project management of renewable energy based on classification stage of the life cycle of products of the projects, adapted to the goals and objectives of information modeling, which allowed to formulate stricter requirements information models used at different stages of the power plant is proposed. A classification of the alternative energy projects, which highlighting areas for activities is proposed. The list of stakeholders that have an impact on alternative energy projects and presented their classification is defined. The value of alternative energy projects considered from the standpoint of a utilitarian approach, using the concept of utility and on the basis of this concept proposed classification values of alternative energy projects. Criteria values as indicators for assessing the value of alternative energy projects and their weights determined by pairwise comparison. To take into account the changes of the value criteria over time proposed to use the key control points value, assessed value criteria in various key points of control, defined indicator of the total value of alternative energy projects. The classification of risks and tools for value-oriented risk management in alternative energy projects is proposed. Further study authors plan to link the development of mechanisms for harmonization value alternative energy projects for their stakeholders.

  4. Project Management Methods in Projects Co-financed by EU Funds

    OpenAIRE

    Kostalova, Jana; Tetrevova, Libena; Patak, Michal

    2017-01-01

    This paper deals with the management of projects co-financed by European Union funds (structural funds and the Cohesion Fund) in the Czech Republic (EU projects). The authors aimed to analyze and assess the scope of familiarity with basic project management methods and their application within the implementation of EU projects in the Czech Republic in the Programming Period 2007–2013. Based on a questionnaire survey of EU project organisers, the authors evaluate their attitudes to project man...

  5. The impact of project marketing on the projects finality

    Directory of Open Access Journals (Sweden)

    Oxana SAVCIUC

    2015-06-01

    Full Text Available In the last years we assist at the level of the Republic of Moldova and also at international level at a trend to offer financial support with a special focus on project-based funding. Once with the appearance and development of the project concept, other related concepts are being developed such as project management or newly, we can also speak about the projects marketing. Until recently, the product marketing was intensely discussed; concepts such as services marketing appeared afterwards, but also the specific marketing for various branches, such as agromarketing, political marketing, etc. Given that fact that the projects are a product / service itself, at the moment, more and more often projects marketing is discussed.

  6. Multi-scale, multi-model assessment of projected land allocation

    Science.gov (United States)

    Vernon, C. R.; Huang, M.; Chen, M.; Calvin, K. V.; Le Page, Y.; Kraucunas, I.

    2017-12-01

    Effects of land use and land cover change (LULCC) on climate are generally classified into two scale-dependent processes: biophysical and biogeochemical. An extensive amount of research has been conducted related to the impact of each process under alternative climate change futures. However, these studies are generally focused on the impacts of a single process and fail to bridge the gap between sector-driven scale dependencies and any associated dynamics. Studies have been conducted to better understand the relationship of these processes but their respective scale has not adequately captured overall interdependencies between land surface changes and changes in other human-earth systems (e.g., energy, water, economic, etc.). There has also been considerable uncertainty surrounding land use land cover downscaling approaches due to scale dependencies. Demeter, a land use land cover downscaling and change detection model, was created to address this science gap. Demeter is an open-source model written in Python that downscales zonal land allocation projections to the gridded resolution of a user-selected spatial base layer (e.g., MODIS, NLCD, EIA CCI, etc.). Demeter was designed to be fully extensible to allow for module inheritance and replacement for custom research needs, such as flexible IO design to facilitate the coupling of Earth system models (e.g., the Accelerated Climate Modeling for Energy (ACME) and the Community Earth System Model (CESM)) to integrated assessment models (e.g., the Global Change Assessment Model (GCAM)). In this study, we first assessed the sensitivity of downscaled LULCC scenarios at multiple resolutions from Demeter to its parameters by comparing them to historical LULC change data. "Optimal" values of key parameters for each region were identified and used to downscale GCAM-based future scenarios consistent with those in the Land Use Model Intercomparison Project (LUMIP). Demeter-downscaled land use scenarios were then compared to the

  7. Analyzing Project Management Maturity Level in Indonesia

    Directory of Open Access Journals (Sweden)

    Eliot Simangunsong

    2013-04-01

    Full Text Available Project management has been generally known and increasingly used by many organizations to gain competitive advantage. In this context, many studies have proposed maturity models to evaluate how project management knowledge has been deployed effectively and efficiently in or- ganization. As a developing country, Indonesia needs many development projects managed by government and private companies in different industries. Here, a study to assess project manage- ment maturity level in Indonesian businesses may bring insight about current business practices, which is important to speed up country development and business sustainability. Adapting the Project Management Maturity Model (ProMMM, a survey instrument has been developed and ap- plied to professionals from Jakarta and surrounding area. The result of analysis shows that con- struction and primary industry have a higher maturity level compare to manufacturing and servic- es. It is to be noted, however, that the level of project management understanding is low across in- dustries. This indicates that more quality project management training or certification is required to improve overall project management knowledge in Indonesia.

  8. North American Carbon Project (NACP) Regional Model-Model and Model-Data Intercomparison Project

    Science.gov (United States)

    Huntzinger, D. N.; Post, W. M.; Jacobson, A. R.; Cook, R. B.

    2009-05-01

    questions: 1. Do model results and observations show consistent spatial patterns in response to the 2002 drought? From measurements and model, can we infer what processes were affected by the 2002 drought? 2. What is the spatial pattern and magnitude of interannual variation in carbon sources and sinks? What are the components of carbon fluxes and pools that contribute to this variation? 3. What are the magnitudes and spatial distribution of carbon sources and sinks, and their uncertainties during the period 2000-2005? Examining and comparing results of inverse and forward model simulations with each other and with suitable benchmark spatial measurements help evaluate model strengths/weaknesses and utility, thereby providing multiple views of spatial and temporal patterns of fluxes, leading to better understandings of processes involved, and providing an improved basis for making projections.

  9. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    Science.gov (United States)

    Alagba, Tonye J.

    Oil and gas drilling projects are the primary means by which oil companies recover large volumes of commercially available hydrocarbons from deep reservoirs. These types of projects are complex in nature, involving management of multiple stakeholder interfaces, multidisciplinary personnel, complex contractor relationships, and turbulent environmental and market conditions, necessitating the application of proven project management best practices and critical success factors (CSFs) to achieve success. Although there is some practitioner oriented literature on project management CSFs for drilling projects, none of these is based on empirical evidence, from research. In addition, the literature has reported alarming rates of oil and gas drilling project failure, which is attributable not to technical factors, but to failure of project management. The aim of this quantitative correlational study therefore, was to discover an empirically verified list of project management CSFs, which consistent application leads to successful implementation of oil and gas drilling projects. The study collected survey data online, from a random sample of 127 oil and gas drilling personnel who were members of LinkedIn's online community "Drilling Supervisors, Managers, and Engineers". The results of the study indicated that 10 project management factors are individually related to project success of oil and gas drilling projects. These 10 CSFs are namely; Project mission, Top management support, Project schedule/plan, Client consultation, Personnel, Technical tasks, Client acceptance, Monitoring and feedback, Communication, and Troubleshooting. In addition, the study found that the relationships between the 10 CSFs and drilling project success is unaffected by participant and project demographics---role of project personnel, and project location. The significance of these findings are both practical, and theoretical. Practically, application of an empirically verified CSFs list to oil

  10. Procedures and models for estimating preconstruction costs of highway projects.

    Science.gov (United States)

    2012-07-01

    This study presents data driven and component based PE cost prediction models by utilizing critical factors retrieved from ten years of historical project data obtained from ODOT roadway division. The study used factor analysis of covariance and corr...

  11. A Correlational Study Assessing the Relationships among Information Technology Project Complexity, Project Complication, and Project Success

    Science.gov (United States)

    Williamson, David J.

    2011-01-01

    The specific problem addressed in this study was the low success rate of information technology (IT) projects in the U.S. Due to the abstract nature and inherent complexity of software development, IT projects are among the most complex projects encountered. Most existing schools of project management theory are based on the rational systems…

  12. Application of Project Portfolio Management

    Science.gov (United States)

    Pankowska, Malgorzata

    The main goal of the chapter is the presentation of the application project portfolio management approach to support development of e-Municipality and public administration information systems. The models of how people publish and utilize information on the web have been transformed continually. Instead of simply viewing on static web pages, users publish their own content through blogs and photo- and video-sharing slides. Analysed in this chapter, ICT (Information Communication Technology) projects for municipalities cover the mixture of the static web pages, e-Government information systems, and Wikis. So, for the management of the ICT projects' mixtures the portfolio project management approach is proposed.

  13. MARKET ENTRY STRATEGIES TO EMERGING MARKETS: A CONCEPTUAL MODEL OF TURNKEY PROJECT DEVELOPMENT

    OpenAIRE

    Bistra Vassileva; Miroslav Nikolov

    2016-01-01

    The main purpose of the paper is to analyse the international market entry strategies in the light of globalisation processes and to propose a conceptual model of turnkey projects as market entry mode. The specific research objectives are as follows: 1. to develop an integrated framework of the turnkey marketing process as a conceptual model; 2. to analyse BRICS countries as potential host countries for turnkey projects implementation; 3. to assess potential implications of proposed concep...

  14. The Agricultural Model Intercomparison and Improvement Project (AgMIP): Overview and Progress

    Science.gov (United States)

    Rosenzweig, C.; Hatfield, J.; Jones, J. W.; Ruane, A. C.

    2012-12-01

    The Agricultural Model Intercomparison and Improvement Project (AgMIP) is an international effort to assess the state of global agricultural modeling and to understand climate impacts on the agricultural sector. AgMIP connects the climate science, crop modeling, and agricultural economic modeling communities to generate probabilistic projections of current and future climate impacts. The goals of AgMIP are to improve substantially the characterization of risk of hunger and world food security due to climate change and to enhance adaptation capacity in both developing and developed countries. This presentation will describe the general approach of AgMIP and highlight its findings and activities. AgMIP crop model intercomparisons have been established for wheat (27 models participating), maize (25 models), and rice (15+ models), and are being established for sugarcane, soybean, sorghum/millet, and peanut. In coordination with these pilots, methodologies to utilize weather generators and downscaled climate simulations for agricultural applications are under development. An AgMIP global agricultural economics model intercomparison with participation of 11 international groups is ongoing, and a number of global biophysical models are currently being evaluated for future climate impacts on agricultural lands both as part of the Inter-Sectoral Impact Model Intercomparison Project (ISI-MIP) and for contribution to the IPCC Fifth Assessment Report (AR5). AgMIP is also organizing regional research efforts, and has already held workshops in South America, Sub-Saharan Africa, South Asia, Europe, and North America. Outcomes from these meetings have informed AgMIP activities, and 10 research teams from Sub-Saharan Africa and South Asia have been selected for project funding. Additional activities are planned for Australia and East Asia. As the AgMIP research community continues to work towards its goals, three key cross-cutting scientific challenges have emerged and are being

  15. Intercomparison of hydrological model structures and calibration approaches in climate scenario impact projections

    Science.gov (United States)

    Vansteenkiste, Thomas; Tavakoli, Mohsen; Ntegeka, Victor; De Smedt, Florimond; Batelaan, Okke; Pereira, Fernando; Willems, Patrick

    2014-11-01

    The objective of this paper is to investigate the effects of hydrological model structure and calibration on climate change impact results in hydrology. The uncertainty in the hydrological impact results is assessed by the relative change in runoff volumes and peak and low flow extremes from historical and future climate conditions. The effect of the hydrological model structure is examined through the use of five hydrological models with different spatial resolutions and process descriptions. These were applied to a medium sized catchment in Belgium. The models vary from the lumped conceptual NAM, PDM and VHM models over the intermediate detailed and distributed WetSpa model to the fully distributed MIKE SHE model. The latter model accounts for the 3D groundwater processes and interacts bi-directionally with a full hydrodynamic MIKE 11 river model. After careful and manual calibration of these models, accounting for the accuracy of the peak and low flow extremes and runoff subflows, and the changes in these extremes for changing rainfall conditions, the five models respond in a similar way to the climate scenarios over Belgium. Future projections on peak flows are highly uncertain with expected increases as well as decreases depending on the climate scenario. The projections on future low flows are more uniform; low flows decrease (up to 60%) for all models and for all climate scenarios. However, the uncertainties in the impact projections are high, mainly in the dry season. With respect to the model structural uncertainty, the PDM model simulates significantly higher runoff peak flows under future wet scenarios, which is explained by its specific model structure. For the low flow extremes, the MIKE SHE model projects significantly lower low flows in dry scenario conditions in comparison to the other models, probably due to its large difference in process descriptions for the groundwater component, the groundwater-river interactions. The effect of the model

  16. Modelling sequential Biosphere systems under Climate change for radioactive waste disposal. Project BIOCLIM

    International Nuclear Information System (INIS)

    Texier, D.; Degnan, P.; Loutre, M.F.; Lemaitre, G.; Paillard, D.; Thorne, M.

    2000-01-01

    The BIOCLIM project (Modelling Sequential Biosphere systems under Climate change for Radioactive Waste Disposal) is part of the EURATOM fifth European framework programme. The project was launched in October 2000 for a three-year period. It is coordinated by ANDRA, the French national radioactive waste management agency. The project brings together a number of European radioactive waste management organisations that have national responsibilities for the safe disposal of radioactive wastes, and several highly experienced climate research teams. Waste management organisations involved are: NIREX (UK), GRS (Germany), ENRESA (Spain), NRI (Czech Republic) and ANDRA (France). Climate research teams involved are: LSCE (CEA/CNRS, France), CIEMAT (Spain), UPMETSIMM (Spain), UCL/ASTR (Belgium) and CRU (UEA, UK). The Environmental Agency for England and Wales provides a regulatory perspective. The consulting company Enviros Consulting (UK) assists ANDRA by contributing to both the administrative and scientific aspects of the project. This paper describes the project and progress to date. (authors)

  17. Solid Waste Projection Model: Database (Version 1.3)

    International Nuclear Information System (INIS)

    Blackburn, C.L.

    1991-11-01

    The Solid Waste Projection Model (SWPM) system is an analytical tool developed by Pacific Northwest Laboratory (PNL) for Westinghouse Hanford Company (WHC). The SWPM system provides a modeling and analysis environment that supports decisions in the process of evaluating various solid waste management alternatives. This document, one of a series describing the SWPM system, contains detailed information regarding the software and data structures utilized in developing the SWPM Version 1.3 Database. This document is intended for use by experienced database specialists and supports database maintenance, utility development, and database enhancement

  18. Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Small, R. Justin [Woods Hole Oceanographic Institution, MA (United States); Bryan, Frank [Woods Hole Oceanographic Institution, MA (United States); Tribbia, Joseph [Woods Hole Oceanographic Institution, MA (United States); Park, Sungsu [Woods Hole Oceanographic Institution, MA (United States); Dennis, John [Woods Hole Oceanographic Institution, MA (United States); Saravanan, R. [Woods Hole Oceanographic Institution, MA (United States); Schneider, Niklas [Woods Hole Oceanographic Institution, MA (United States); Kwon, Young-Oh [Woods Hole Oceanographic Institution, MA (United States)

    2015-06-01

    Most climate models are currently run with grid spacings of around 100km, which, with today’s computing power, allows for long (up to 1000 year) simulations, or ensembles of simulations to explore climate change and variability. However this grid spacing does not resolve important components of the weather/climate system such as atmospheric fronts and mesoscale systems, and ocean boundary currents and eddies. The overall aim of this project has been to look at the effect of these small-scale features on the weather/climate system using a suite of high and low resolution climate models, idealized models and observations. This project was only possible due to the highly scalable aspect of the CAM Spectral Element dynamical core, and the significant resources allocated at Yellowstone and NERSC for which we are grateful.

  19. Project finance of hydroelectric power plants in Brazil; 'Project finance' de usinas hidroeletricas no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro Filho, Valfredo de Assis; Ramos, Maria Olivia de Souza [Universidade Salvador (UNIFACS), BA (Brazil)

    2008-07-01

    The aim of this paper is to discuss the modality of project finance of financing of enterprises, which is the main modality of structuring of hydroelectric projects in Brazil. In the discussion will be highlighted the importance of contracts EPC (Engineering, Search and Construction) in the structuring of project finances. This financing model has particular characteristics related to risk sharing and financial flexibility that enable the financing of projects with long-term capital, however, due to participation of various actors and the nature of the structure of project finance, the negotiation and drafting of contracts are always very complex.

  20. In modelling effects of global warming, invalid assumptions lead to unrealistic projections.

    Science.gov (United States)

    Lefevre, Sjannie; McKenzie, David J; Nilsson, Göran E

    2018-02-01

    In their recent Opinion, Pauly and Cheung () provide new projections of future maximum fish weight (W ∞ ). Based on criticism by Lefevre et al. (2017) they changed the scaling exponent for anabolism, d G . Here we find that changing both d G and the scaling exponent for catabolism, b, leads to the projection that fish may even become 98% smaller with a 1°C increase in temperature. This unrealistic outcome indicates that the current W ∞ is unlikely to be explained by the Gill-Oxygen Limitation Theory (GOLT) and, therefore, GOLT cannot be used as a mechanistic basis for model projections about fish size in a warmer world. © 2017 John Wiley & Sons Ltd.

  1. An anatomy of the projected North Atlantic warming hole in CMIP5 models

    Science.gov (United States)

    Menary, Matthew B.; Wood, Richard A.

    2018-04-01

    Global mean surface air temperature has increased over the past century and climate models project this trend to continue. However, the pattern of change is not homogeneous. Of particular interest is the subpolar North Atlantic, which has cooled in recent years and is projected to continue to warm less rapidly than the global mean. This is often termed the North Atlantic warming hole (WH). In climate model projections, the development of the WH is concomitant with a weakening of the Atlantic meridional overturning circulation (AMOC). Here, we further investigate the possible link between the AMOC and WH and the competing drivers of vertical mixing and surface heat fluxes. Across a large ensemble of 41 climate models we find that the spatial structure of the WH varies considerably from model to model but is generally upstream of the simulated deep water formation regions. A heat budget analysis suggests the formation of the WH is related to changes in ocean heat transport. Although the models display a plethora of AMOC mean states, they generally predict a weakening and shallowing of the AMOC also consistent with the evolving depth structure of the WH. A lagged regression analysis during the WH onset phase suggests that reductions in wintertime mixing lead a weakening of the AMOC by 5 years in turn leading initiation of the WH by 5 years. Inter-model differences in the evolution and structure of the WH are likely to lead to somewhat different projected climate impacts in nearby Europe and North America.

  2. IT Project Evaluation and Investment Decision

    Institute of Scientific and Technical Information of China (English)

    黄东兵; 张世英

    2004-01-01

    There are many kinds of real options,which are valuable,in each phase of the lifetime of an information technology(IT)project.However,in the current IT investment decision theory,real options that embedded in IT projects are not considered. In this paper, the process of IT project decision and implementation is fully analyzed, the real options that may be embedded in an IT project are identified, and a real option analysis (ROA) method is proposed for evaluation of an IT project under uncertain business environment. ROA employs Black-Scholes expansion model and cancels the assumption that the cost of project is certain. The numerical example manifests that the ROA can better evaluate IT project and select the IT investment alternative. Finally, a road map is provided to help selecting the suitable evaluation method to make IT investment decision.

  3. A multilevel study of the impact of project manager's leadership on extra-role performance of project team members

    Science.gov (United States)

    Shokory, Suzyanty Mohd; Suradi, Nur Riza Mohd

    2018-04-01

    The current study examines the impact of transformational and transactional leadership of project manager on the extra-role performance of project team members. In addition, this study also identifies factor dominant to extra-role performance of project team members when the transformational and transactional leadership of project managers are analyzed simultaneously. The study involved 175 of project team members from 35 project teams (each project team consists of different contracting companies registered in the Selangor (N = 175 from 35 contractors company). A multilevel analysis with hierarchical linear modeling (HLM) approach was used in this study. The analysis showed that transformational and transactional leadership of the project manager is a positive significant with extra-role performance project team members when analyzed separately. However when the two constructs (transformational leadership and transactional leadership of project manager) were analyzed simultaneously, transformational leadership was found to have more impact on extra-role performance project team members compared to transactional leadership. These findings explained that although transformational and transactional leadership of project managers can improve extra-role performance project team members, but this study has proved that transformational leadership of project managers affect extra-role performance project team members more as compared to transactional leadership.

  4. Final project report

    Energy Technology Data Exchange (ETDEWEB)

    Nitin S. Baliga and Leroy Hood

    2008-11-12

    The proposed overarching goal for this project was the following: Data integration, simulation and visualization will facilitate metabolic and regulatory network prediction, exploration, and formulation of hypotheses. We stated three specific aims to achieve the overarching goal of this project: (1) Integration of multiple levels of information such as mRNA and protein levels, predicted protein-protein interactions/associations and gene function will enable construction of models describing environmental response and dynamic behavior. (2) Flexible tools for network inference will accelerate our understanding of biological systems. (3) Flexible exploration and queries of model hypotheses will provide focus and reveal novel dependencies. The underlying philosophy of these proposed aims is that an iterative cycle of experiments, experimental design, and verification will lead to a comprehensive and predictive model that will shed light on systems level mechanisms involved in responses elicited by living systems upon sensing a change in their environment. In the previous years report we demonstrated considerable progress in development of data standards, regulatory network inference and data visualization and exploration. We are pleased to report that several manuscripts describing these procedures have been published in top international peer reviewed journals including Genome Biology, PNAS, and Cell. The abstracts of these manuscripts are given and they summarize our accomplishments in this project.

  5. A Decision Model Assessing the Owner and Contractor’s Conflict Behaviors in Construction Projects

    Directory of Open Access Journals (Sweden)

    Guangdong Wu

    2018-01-01

    Full Text Available Considering the effects of the contractor’s conflict behaviors on the project benefit, a decision model between the owner and contractor’s conflict behaviors in construction projects was constructed using the principal-agent theory and game theory. The model was analyzed under nonconflicting and conflicting conditions, and a numerical simulation and example analysis were proposed to verify the constructed model’s conclusion. The results showed that the effort levels of the owner and contractor not only relate to benefit-sharing coefficient and effort outcome coefficient but also depend on the contractor’s ability of converting the conflict into benefit and the loss caused by conflict behaviors. A higher ability of converting conflicts into benefits and lower levels of the loss caused by conflict behaviors for the contractor lead to lower levels of the net benefit of the owner, conversely higher levels of the net benefit of the contractor. Balancing the contractor’s ability of converting conflicts into benefits and the loss caused by conflict behaviors lead to a more reasonable risk allocation between the owner and contractor, improving the effort level and net benefit. To add value to the construction project, the owner should establish an impartial and reasonable benefit-sharing mechanism, optimize the owner and contractor’s resource arrangement, maximize the positive effect of conflict on project benefits, and avoid the negative effect of conflict. Few studies to date have investigated the effects of conflict behaviors on project benefits in terms of modeling and simulation in construction projects. As such, this study bridges this gap and contributes significant theoretical and practical insights about managing conflict behaviors in an interorganizational context, thus enhancing performance in construction projects.

  6. Pengembangan Model Pembelajaran Project Based Learning pada Mata Kuliah Computer Aided Design

    Directory of Open Access Journals (Sweden)

    Satoto Endar Nayono

    2013-09-01

    Full Text Available One of the key competencies of graduates majoring in Civil Engineering and Planning Education, Faculty of Engineering, Yogyakarta State University (YSU is able to plan buildings. CAD courses aim to train students to be able to pour the planning concepts into the picture. One of the obstacles faced in the course are concepts and pictures that created by the students often do not correspond to the standards used in the field. This study aims to develop a model of project-based learning so that the students’ pictures are more in line with the actual conditions in the field. This study was carried out through the stages as follows: (1 Pre test, (2 Planning of learning, (3 Implementation of the learning model of project-based learning, (4 monitoring and evaluation (5 Reflection and revision, (6 Implementation of learning in the next cycle, and (7 Evaluation of the learning outcomes. This study was conducted for four months in 2012 in the Department of Civil Engineering and Planning Education, Faculty of Engineering, YSU. The subjects of this study are the students who took the course of Computer Aided Design. The analysis of the data used descriptive qualitative and descriptive statistics. The results of this study were: (1 The implementation of project based learning model was proven to increase the learning process and the learning outcomes of students in the subject of CAD through the provision of buildings planning pictures tasks of school buildings based on the real conditions in the field. The task was delivered in every meeting and improved based on the feedback from their lecturers, (2 the learning model of project based learning will be easier to be implemented if it is accompanied by the model of peer tutoring and the learning model of PAIKEM.

  7. Assessment of CMIP5 climate models and projected temperature changes over Northern Eurasia

    International Nuclear Information System (INIS)

    Miao, Chiyuan; Duan, Qingyun; Sun, Qiaohong; Kong, Dongxian; Ye, Aizhong; Di, Zhenhua; Gong, Wei; Huang, Yong; Yang, Tiantian

    2014-01-01

    Assessing the performance of climate models in surface air temperature (SAT) simulation and projection have received increasing attention during the recent decades. This paper assesses the performance of the Coupled Model Intercomparison Project phase 5 (CMIP5) in simulating intra-annual, annual and decadal temperature over Northern Eurasia from 1901 to 2005. We evaluate the skill of different multi-model ensemble techniques and use the best technique to project the future SAT changes under different emission scenarios. The results show that most of the general circulation models (GCMs) overestimate the annual mean SAT in Northern Eurasia and the difference between the observation and the simulations primarily comes from the winter season. Most of the GCMs can approximately capture the decadal SAT trend; however, the accuracy of annual SAT simulation is relatively low. The correlation coefficient R between each GCM simulation and the annual observation is in the range of 0.20 to 0.56. The Taylor diagram shows that the ensemble results generated by the simple model averaging (SMA), reliability ensemble averaging (REA) and Bayesian model averaging (BMA) methods are superior to any single GCM output; and the decadal SAT change generated by SMA, REA and BMA are almost identical during 1901–2005. Heuristically, the uncertainty of BMA simulation is the smallest among the three multi-model ensemble simulations. The future SAT projection generated by the BMA shows that the SAT in Northern Eurasia will increase in the 21st century by around 1.03 °C/100 yr, 3.11 °C/100 yr and 7.14 °C/100 yr under the RCP 2.6, RCP 4.5 and RCP 8.5 scenarios, respectively; and the warming accelerates with the increasing latitude. In addition, the spring season contributes most to the decadal warming occurring under the RCP 2.6 and RCP 4.5 scenarios, while the winter season contributes most to the decadal warming occurring under the RCP 8.5 scenario. Generally, the uncertainty of the SAT

  8. THE PARAMETER OPTIMIZATION MODEL OF INVESTMENT AND CONSTRUCTION PROJECTS AND MANAGERIAL FEASIBILITY OF THEIR BEHAVIOR

    Directory of Open Access Journals (Sweden)

    P. Ye. Uvarov

    2009-09-01

    Full Text Available In the article the basic problem of substantiation of parameters of optimization model of organizationaltechnological solutions for investment-building projects in the system of project management is considered.

  9. NASA's TReK Project: A Case Study in Using the Spiral Model of Software Development

    Science.gov (United States)

    Hendrix, T. Dean; Schneider, Michelle P.

    1998-01-01

    Software development projects face numerous challenges that threaten their successful completion. Whether it is not enough money, too little time, or a case of "requirements creep" that has turned into a full sprint, projects must meet these challenges or face possible disastrous consequences. A robust, yet flexible process model can provide a mechanism through which software development teams can meet these challenges head on and win. This article describes how the spiral model has been successfully tailored to a specific project and relates some notable results to date.

  10. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Harboe, Peter Georg; Riis, Eva

    2016-01-01

    such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case...

  11. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Riis, Eva; Harboe, Peter Georg

    2016-01-01

    integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems...

  12. Toward a model of socializing project team members : An integrative approach

    NARCIS (Netherlands)

    Batistič, S.; Kenda, R.

    2018-01-01

    Project work is becoming more and more important in everyday business, as is staffing the right newcomers for the project. Recognizing that not all new project team workers possess equally important specific knowledge, skills and abilities for the success of projects, we draw on project management,

  13. Development of generic key performance indicators for PMBOK® using a 3D project integration model

    Directory of Open Access Journals (Sweden)

    Craig Langston

    2013-12-01

    Full Text Available Since Martin Barnes’ so-called ‘iron triangle’ circa 1969, much debate has occurred over how best to describe the fundamental constraints that underpin project success. This paper develops a 3D project integration model for PMBOK® comprising core constraints of scope, cost, time and risk as a basis to propose six generic key performance indicators (KPIs that articulate successful project delivery. These KPIs are defined as value, efficiency, speed, innovation, complexity and impact and can each be measured objectively as ratios of the core constraints. An overall KPI (denoted as s3/ctr is also derived. The aim in this paper is to set out the case for such a model and to demonstrate how it can be employed to assess the performance of project teams in delivering successful outcomes at various stages in the project life cycle. As part of the model’s development, a new PMBOK® knowledge area concerning environmental management is advanced.

  14. Systems engineering real estate development projects

    Science.gov (United States)

    Gusakova, Elena; Titarenko, Boris; Stepanov, Vitaliy

    2017-10-01

    In recent years, real estate development has accumulated a wealth of experience in implementing major projects, which requires comprehension and systematization. The scientific instrument of system engineering is studied in the article and is substantively interpreted with reference to real estate development projects. The most perspective approaches and models are substantiated, allowing strategically to plan the life cycle of the project as a whole, and also to solve the engineering butt problems of the project. The relevance of further scientific studies of regularities and specifics of the life cycle of real estate development projects conducted at the Moscow State University of Economics and Management at the ISTA department is shown.

  15. Trevino Project: a fast-track approach for a small construction project

    International Nuclear Information System (INIS)

    Schick, C.J.; Lynn, N.S.

    1982-01-01

    The approach to a construction project can vary according to the size, location, and degree of difficulty associated with the project. This paper deals with one approach that can be taken to a small construction project, the fast-track approach. A small construction project can be defined as a project having less than $20 million capital cost or a project with a low degree of difficulty. This approach is very applicable to in-situ leaching uranium projects, small precious metal operations, etc. The approach to the small project is that of fast-tracking the project in order to minimize the time over which capital expenditure occurs and also to reduce the indirect costs of field expense, construction supplies, construction equipment, etc. In order to fast-track a project it is necessary to do a very precise job on the preliminary phases of the project such as preliminary engineering, plant site location, environmental permits, etc. 2 figures, 2 tables

  16. Epidemiological and demographic HIV/AIDS projections: South Africa

    African Journals Online (AJOL)

    Epidemiological and demographic HIV/AIDS projections: South Africa. ... African Journal of AIDS Research ... Projections and the Spectrum model program developed by the Futures Group were used to model the South African HIV epidemic, project future trends in HIV/AIDS and estimate the demographic impact of AIDS.

  17. Project manager attributes influencing project success in the South ...

    African Journals Online (AJOL)

    success criteria for building projects in Ghana and concluded that the “current and ... qualifications, profession, leadership style and project team ... and expectations of project management competence between ... 1.d. Sense of teamwork ...

  18. Microsoft project

    OpenAIRE

    Markić, Lucija; Mandušić, Dubravka; Grbavac, Vitomir

    2005-01-01

    Microsoft Project je alat čije su prednosti u svakodnevnom radu nezamjenjive. Pomoću Microsoft Projecta omogućeno je upravljanje resursima, stvaranje izvještaja o projektima u vremenu, te analize različitih scenarija. Pojavljuje u tri verzije: Microsoft Project Professional, Microsoft Project Server i Microsoft Project Server Client Access Licenses. Upravo je trend da suvremeni poslovni ljudi zadatke povjeravaju Microsoft Projectu jer on znatno povećava produktivnost rada. Te prednos...

  19. Multimode model for projective photon-counting measurements

    International Nuclear Information System (INIS)

    Tualle-Brouri, Rosa; Ourjoumtsev, Alexei; Dantan, Aurelien; Grangier, Philippe; Wubs, Martijn; Soerensen, Anders S.

    2009-01-01

    We present a general model to account for the multimode nature of the quantum electromagnetic field in projective photon-counting measurements. We focus on photon-subtraction experiments, where non-Gaussian states are produced conditionally. These are useful states for continuous-variable quantum-information processing. We present a general method called mode reduction that reduces the multimode model to an effective two-mode problem. We apply this method to a multimode model describing broadband parametric down-conversion, thereby improving the analysis of existing experimental results. The main improvement is that spatial and frequency filters before the photon detector are taken into account explicitly. We find excellent agreement with previously published experimental results, using fewer free parameters than before, and discuss the implications of our analysis for the optimized production of states with negative Wigner functions.

  20. BOT schemes as financial model of hydro power projects

    International Nuclear Information System (INIS)

    Grausam, A.

    1997-01-01

    Build-operate-transfer (BOT) schemes are the latest methods adopted in the developing infrastructure projects. This paper outlines the project financing through BOT schemes and briefly focuses on the factors particularly relevant to hydro power projects. Hydro power development provides not only the best way to produce electricity, it can also solve problems in different fields, such as navigation problems in case of run-of-the river plants, ground water management systems and flood control etc. This makes HPP projects not cheaper, but hydro energy is a clean and renewable energy and the hydro potential worldwide will play a major role to meet the increased demand in future. 5 figs

  1. Project stakeholder management

    CERN Document Server

    Eskerod, Pernille

    2013-01-01

    Carrying out a project as planned is not a guarantee for success. Projects may fail because project management does not take the requirements, wishes and concerns of stakeholders sufficiently into account. Projects can only be successful though contributions from stakeholders. And in the end, it is the stakeholders that evaluate whether they find that the project is a success. To manage stakeholders effectively, you need to know your stakeholders, their behaviours and attitudes towards the project. In Project Stakeholder Management, the authors give guidance on how to adopt an analytical and s

  2. Project Half Double

    DEFF Research Database (Denmark)

    Svejvig, Per; Gerstrøm, Anna; Frederiksen, Signe Hedeboe

    The Half Double mission: Project Half Double has a clear mission. We want to succeed in finding a project methodology that can increase the success rate of our projects while increasing the development speed of new products and services. We are convinced that by doing so we can strengthen...... the competitiveness of Denmark and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “Projects in half the time with double the impact” where projects in half the time should be understood as half the time to impact (benefit realization, effect is achieved......) and not as half the time for project execution. The Half Double project journey: It all began in May 2013 when we asked ourselves: How do we create a new and radical project paradigm that can create successful projects? Today we are a movement of hundreds of passionate project people, and it grows larger...

  3. Spent nuclear fuel project technical databook

    Energy Technology Data Exchange (ETDEWEB)

    Reilly, M.A.

    1998-07-22

    The Spent Nuclear Fuel (SNF) project technical databook provides project-approved summary tables of selected parameters and derived physical quantities, with nominal design and safety basis values. It contains the parameters necessary for a complete documentation basis of the SNF Project technical and safety baseline. The databook is presented in two volumes. Volume 1 presents K Basins SNF related information. Volume 2 (not yet available) will present selected sludge and water information, as it relates to the sludge and water removal projects. The values, within this databook, shall be used as the foundation for analyses, modeling, assumptions, or other input to SNF project safety analyses or design. All analysis and modeling using a parameter available in this databook are required to use and cite the appropriate associated value, and document any changes to those values (i.e., analysis assumptions, equipment conditions, etc). Characterization and analysis efforts are ongoing to validate, or update these values.

  4. Spent nuclear fuel project technical databook

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1998-01-01

    The Spent Nuclear Fuel (SNF) project technical databook provides project-approved summary tables of selected parameters and derived physical quantities, with nominal design and safety basis values. It contains the parameters necessary for a complete documentation basis of the SNF Project technical and safety baseline. The databook is presented in two volumes. Volume 1 presents K Basins SNF related information. Volume 2 (not yet available) will present selected sludge and water information, as it relates to the sludge and water removal projects. The values, within this databook, shall be used as the foundation for analyses, modeling, assumptions, or other input to SNF project safety analyses or design. All analysis and modeling using a parameter available in this databook are required to use and cite the appropriate associated value, and document any changes to those values (i.e., analysis assumptions, equipment conditions, etc). Characterization and analysis efforts are ongoing to validate, or update these values

  5. Determinants of construction project success in India

    CERN Document Server

    Jha, Kumar Neeraj

    2013-01-01

    This study presents exploratory work and seeks to identify and evaluate the success and failure factors that could form a guideline for further study and to some extent help professionals to understand some critical aspects that impact project performance concerning construction in India. A total of 55 attributes affecting the performance of construction projects are analysed in terms of their level of influence on four key performance criteria – schedule, cost, quality, and no disputes – using a two-stage questionnaire survey. These attributes are then further analysed, interpreted and evaluated.   Based on the critical success factors obtained from the study, a neural network model-based predictive model for project performance has been developed. The performance prediction models have been derived for all four project performance criteria. Further, a hypothesis that ‘project success’ is influenced by ‘success traits’ has also been formulated. The hypothesized positive inter-relationships betwe...

  6. Web Project Management

    OpenAIRE

    Suralkar, Sunita; Joshi, Nilambari; Meshram, B B

    2013-01-01

    This paper describes about the need for Web project management, fundamentals of project management for web projects: what it is, why projects go wrong, and what's different about web projects. We also discuss Cost Estimation Techniques based on Size Metrics. Though Web project development is similar to traditional software development applications, the special characteristics of Web Application development requires adaption of many software engineering approaches or even development of comple...

  7. Regional climate projection of the Maritime Continent using the MIT Regional Climate Model

    Science.gov (United States)

    IM, E. S.; Eltahir, E. A. B.

    2014-12-01

    Given that warming of the climate system is unequivocal (IPCC AR5), accurate assessment of future climate is essential to understand the impact of climate change due to global warming. Modelling the climate change of the Maritime Continent is particularly challenge, showing a high degree of uncertainty. Compared to other regions, model agreement of future projections in response to anthropogenic emission forcings is much less. Furthermore, the spatial and temporal behaviors of climate projections seem to vary significantly due to a complex geographical condition and a wide range of scale interactions. For the fine-scale climate information (27 km) suitable for representing the complexity of climate change over the Maritime Continent, dynamical downscaling is performed using the MIT regional climate model (MRCM) during two thirty-year period for reference (1970-1999) and future (2070-2099) climate. Initial and boundary conditions are provided by Community Earth System Model (CESM) simulations under the emission scenarios projected by MIT Integrated Global System Model (IGSM). Changes in mean climate as well as the frequency and intensity of extreme climate events are investigated at various temporal and spatial scales. Our analysis is primarily centered on the different behavior of changes in convective and large-scale precipitation over land vs. ocean during dry vs. wet season. In addition, we attempt to find the added value to downscaled results over the Maritime Continent through the comparison between MRCM and CESM projection. Acknowledgements.This research was supported by the National Research Foundation Singapore through the Singapore MIT Alliance for Research and Technology's Center for Environmental Sensing and Modeling interdisciplinary research program.

  8. Project Documentation as a Risk for Public Projects

    Directory of Open Access Journals (Sweden)

    Vladěna Štěpánková

    2015-08-01

    Full Text Available Purpose of the article: The paper presents the different methodologies used for creating documentation and focuses on public projects and their requirements for this documentation. Since documentation is also incorporated in the overall planning of the project and its duration is estimated using expert qualified estimate, can any change in this documentation lead to project delays, or increase its cost as a result of consuming administration, and therefore the documentation is seen as a risk, which may threaten the project as a public contract by which a company trying to achieve and obtains it, and generally any project. Methodology/methods: There are used methods of obtaining information in this paper. These are mainly structured interviews in combination with a brainstorming, furthermore also been used questionnaire for companies dealing with public procurement. As a data processing program was used MS Excel and basic statistical methods based on regression analysis. Scientific aim: The article deals with the construction market in the Czech Republic and examines the impact of changes in project documentation of public projects on their turnover. Findings: In this paper we summarize the advantages and disadvantages of having project documentation. In the case of public contracts and changes in legislation it is necessary to focus on creating documentation in advance, follow the new requirements and try to reach them in the shortest possible time. Conclusions: The paper concludes with recommendations on how to proceed, if these changes and how to reduce costs, which may cause the risk of documentation.

  9. Watchdog Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories, Inc., Pullman, WA (United States); Campbell, Jack [CenterPoint Energy Houston Electric, TX (United States); Hadley, Mark [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-12-30

    The Watchdog Project completed 100% of the project Statement of Project Objective (SOPO). The Watchdog project was a very aggressive project looking to accomplish commercialization of technology that had never been commercialized, as a result it took six years to complete not the original three that were planned. No additional federal funds were requested from the original proposal and SEL contributed the additional cost share required to complete the project. The result of the Watchdog Project is the world’s first industrial rated Software Defined Network (SDN) switch commercially available. This technology achieved the SOPOO and DOE Roadmap goals to have strong network access control, improve reliability and network performance, and give the asset owner the ability to minimize attack surface before and during an attack. The Watchdog project is an alliance between CenterPoint Energy Houston Electric, Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. PNNL performs basic and applied research to deliver energy, environmental, and national security for our nation. CenterPoint Energy is the third largest publicly traded natural gas delivery company in the U.S and third largest combined electricity and natural gas delivery company. The Watchdog Project efforts were combined with the SDN Project efforts to produce the entire SDN system solution for the critical infrastructure. The Watchdog project addresses Topic Area of Interest 5: Secure Communications, for the DEFOA- 0000359 by protecting the control system local area network itself and the communications coming from and going to the electronic devices on the local network. Local area networks usually are not routed and have little or no filtering capabilities. Combine this with the fact control system protocols are designed with inherent trust the control

  10. Influence of organizational and project cultures on project success

    Directory of Open Access Journals (Sweden)

    Berdykulova G. M.

    2017-10-01

    Full Text Available the article is dedicated to studying the influence of organizational and project cultures on effective project management of the company by knowledge systematization and the comparative analysis of world companies’ practice that allowed to reveal the main factors and criteria of projects success and negative influence of organizational culture on the project; key aspects of corporate culture and cultural integration under the conditions of globalization.

  11. How Configuration Management Helps Projects Innovate and Communicate

    Science.gov (United States)

    Cioletti, Louis A.; Guidry, Carla F.

    2009-01-01

    This slide presentation reviews the concept of Configuration Management (CM) and compares it to the standard view of Project management (PM). It presents two PM models: (1) Kepner-Tregoe,, and the Deming models, describes why projects fail, and presents methods of how CM helps projects innovate and communicate.

  12. Pac-Rim LNG project : final project report specifications

    International Nuclear Information System (INIS)

    1996-01-01

    PAC-RIM LNG Inc. has submitted a proposal to the British Columbia Environmental Assessment Office, to develop a liquefied natural gas project which would purchase pipeline quality natural gas from sources in northeast British Columbia and Alberta and transport it via a dedicated pipeline system to a LNG processing plant on tidewater on the Pacific coast. The project would include storage and processing facilities and a marine loading terminal. This document sets out the final project report specifications prepared by the Project Committee on the basis of input received from the public, First Nations and federal, provincial and local governments

  13. Does Lean & Agile Project Management Help Coping with Project Complexity?

    NARCIS (Netherlands)

    Jalali Sohi, A.; Hertogh, M.J.C.M.; Bosch-Rekveldt, M.G.C.; Blom, R.; Serpell, A.; Ferrada, X.

    2016-01-01

    Still, projects in the construction sector are delivered with time delays and cost overruns. One of the reasons for poor performance was assigned to project complexity. A combination of lean construction and agile project management are hypothesized as a possible solution to cope with project

  14. The PRISM project

    Science.gov (United States)

    Guilyardi, E.

    2003-04-01

    The European Union's PRISM infrastructure project (PRogram for Integrated earth System Modelling) aims at designing a flexible environment to easily assemble and run Earth System Models (http://prism.enes.org). Europe's widely distributed modelling expertise is both a strength and a challenge. Recognizing this, the PRISM project aims at developing an efficient shared modelling software infrastructure for climate scientists, providing them with an opportunity for greater focus on scientific issues, including the necessary scientific diversity (models and approaches). The proposed PRISM system includes 1) the use - or definition - and promotion of scientific and technical standards to increase component modularity, 2) an end-to-end software environment (coupler, user interface, diagnostics) to launch, monitor and analyze complex Earth System Models built around the existing and future community models, 3) testing and quality standards to ensure HPC performance on a variety of platforms and 4) community wide inputs and requirements capture in all stages of system specifications and design through user/developers meetings, workshops and thematic schools. This science driven project, led by 22 institutes* and started December 1st 2001, benefits from a unique gathering of scientific and technical expertise. More than 30 models (both global and regional) have expressed interest to be part of the PRISM system and 6 types of components have been identified: atmosphere, atmosphere chemistry, land surface, ocean, sea ice and ocean biochemistry. Progress and overall architecture design will be presented. * MPI-Met (Coordinator), KNMI (co-coordinator), MPI-M&D, Met Office, University of Reading, IPSL, Meteo-France, CERFACS, DMI, SMHI, NERSC, ETH Zurich, INGV, MPI-BGC, PIK, ECMWF, UCL-ASTR, NEC, FECIT, SGI, SUN, CCRLE

  15. Ice Sheet Model Intercomparison Project (ISMIP6) Contribution to CMIP6

    Science.gov (United States)

    Nowicki, Sophie M. J.; Payne, Tony; Larour, Eric; Seroussi, Helene; Goelzer, Heiko; Lipscomb, William; Gregory, Jonathan; Abe-Ouchi, Ayako; Shepherd, Andrew

    2016-01-01

    Reducing the uncertainty in the past, present, and future contribution of ice sheets to sea-level change requires a coordinated effort between the climate and glaciology communities. The Ice Sheet Model Intercomparison Project for CMIP6 (ISMIP6) is the primary activity within the Coupled Model Intercomparison Project phase 6 (CMIP6) focusing on the Greenland and Antarctic ice sheets. In this paper, we describe the framework for ISMIP6 and its relationship with other activities within CMIP6. The ISMIP6 experimental design relies on CMIP6 climate models and includes, for the first time within CMIP, coupled ice-sheetclimate models as well as standalone ice-sheet models. To facilitate analysis of the multi-model ensemble and to generate a set of standard climate inputs for standalone ice-sheet models, ISMIP6 defines a protocol for all variables related to ice sheets. ISMIP6 will provide a basis for investigating the feedbacks, impacts, and sea-level changes associated with dynamic ice sheets and for quantifying the uncertainty in ice-sheet-sourced global sea-level change.

  16. Ice Sheet Model Intercomparison Project (ISMIP6) contribution to CMIP6

    Science.gov (United States)

    Nowicki, Sophie M.J.; Payne, Tony; Larour, Eric; Seroussi, Helene; Goelzer, Heiko; Lipscomb, William; Gregory, Jonathan; Abe-Ouchi, Ayako; Shepherd, Andrew

    2018-01-01

    Reducing the uncertainty in the past, present and future contribution of ice sheets to sea-level change requires a coordinated effort between the climate and glaciology communities. The Ice Sheet Model Intercomparison Project for CMIP6 (ISMIP6) is the primary activity within the Coupled Model Intercomparison Project – phase 6 (CMIP6) focusing on the Greenland and Antarctic Ice Sheets. In this paper, we describe the framework for ISMIP6 and its relationship to other activities within CMIP6. The ISMIP6 experimental design relies on CMIP6 climate models and includes, for the first time within CMIP, coupled ice sheet – climate models as well as standalone ice sheet models. To facilitate analysis of the multi-model ensemble and to generate a set of standard climate inputs for standalone ice sheet models, ISMIP6 defines a protocol for all variables related to ice sheets. ISMIP6 will provide a basis for investigating the feedbacks, impacts, and sea-level changes associated with dynamic ice sheets and for quantifying the uncertainty in ice-sheet-sourced global sea-level change. PMID:29697697

  17. A Project Management Approach to Using Simulation for Cost Estimation on Large, Complex Software Development Projects

    Science.gov (United States)

    Mizell, Carolyn; Malone, Linda

    2007-01-01

    It is very difficult for project managers to develop accurate cost and schedule estimates for large, complex software development projects. None of the approaches or tools available today can estimate the true cost of software with any high degree of accuracy early in a project. This paper provides an approach that utilizes a software development process simulation model that considers and conveys the level of uncertainty that exists when developing an initial estimate. A NASA project will be analyzed using simulation and data from the Software Engineering Laboratory to show the benefits of such an approach.

  18. Assessing the Option to Abandon an Investment Project by the Binomial Options Pricing Model

    Directory of Open Access Journals (Sweden)

    Salvador Cruz Rambaud

    2016-01-01

    Full Text Available Usually, traditional methods for investment project appraisal such as the net present value (hereinafter NPV do not incorporate in their values the operational flexibility offered by including a real option included in the project. In this paper, real options, and more specifically the option to abandon, are analysed as a complement to cash flow sequence which quantifies the project. In this way, by considering the existing analogy with financial options, a mathematical expression is derived by using the binomial options pricing model. This methodology provides the value of the option to abandon the project within one, two, and in general n periods. Therefore, this paper aims to be a useful tool in determining the value of the option to abandon according to its residual value, thus making easier the control of the uncertainty element within the project.

  19. Simulation-based valuation of project finance investments. Crucial aspects of power plant projects

    Energy Technology Data Exchange (ETDEWEB)

    Pietz, Matthaeus

    2010-12-15

    The liberalization of electricity markets transformed a regulated and stable market to a market with former unknown price volatility. This results in a high uncertainty which is mainly due to the, from an economic point of view, lack of storability of the commodity electricity. Thus investments in power plants are highly risky. This dissertation analyzes crucial aspects within the valuation of a power plant financed via project finance, a popular financing method for projects with high capital requirements. Starting with the development of a valuation model based on stochastic modelling of the future cash flows the focus of the analysis is on the impact of model complexity and electricity prices. (orig.)

  20. Modern project-management

    CERN Multimedia

    CERN. Geneva

    2003-01-01

    This lecture will focus on the following issues: - The current state of the art in Project Management, especially the integration of Project Management with general management activities, and the integrated view of resources allocation. - Overview of the project life cycle, the phases and the deliverables - Necessity and limits of planning in a research environment - Organizational aspects of the projects the roles of the stakeholders - How to get the resources when they are needed - Risk Management in Projects - Earned value - How to keep a project on track (schedule and budget) - Management of the suppliers - Closing of the project

  1. Collaborative Project: Improving the Representation of Coastal and Estuarine Processes in Earth System Models

    Energy Technology Data Exchange (ETDEWEB)

    Bryan, Frank [Univ. of Washington, Seattle, WA (United States); Dennis, John [Univ. of Washington, Seattle, WA (United States); MacCready, Parker [Univ. of Washington, Seattle, WA (United States); Whitney, Michael [Univ. of Washington, Seattle, WA (United States)

    2016-10-20

    This project aimed to improve long term global climate simulations by resolving and enhancing the representation of the processes involved in the cycling of freshwater through estuaries and coastal regions. This was a collaborative multi-institution project consisting of physical oceanographers, climate model developers, and computational scientists. It specifically targeted the DOE objectives of advancing simulation and predictive capability of climate models through improvements in resolution and physical process representation.

  2. A framework for testing the ability of models to project climate change and its impacts

    DEFF Research Database (Denmark)

    Refsgaard, J. C.; Madsen, H.; Andréassian, V.

    2014-01-01

    Models used for climate change impact projections are typically not tested for simulation beyond current climate conditions. Since we have no data truly reflecting future conditions, a key challenge in this respect is to rigorously test models using proxies of future conditions. This paper presents...... a validation framework and guiding principles applicable across earth science disciplines for testing the capability of models to project future climate change and its impacts. Model test schemes comprising split-sample tests, differential split-sample tests and proxy site tests are discussed in relation...... to their application for projections by use of single models, ensemble modelling and space-time-substitution and in relation to use of different data from historical time series, paleo data and controlled experiments. We recommend that differential-split sample tests should be performed with best available proxy data...

  3. Project management: importance for diagnostic laboratories.

    Science.gov (United States)

    Croxatto, A; Greub, G

    2017-07-01

    The need for diagnostic laboratories to improve both quality and productivity alongside personnel shortages incite laboratory managers to constantly optimize laboratory workflows, organization, and technology. These continuous modifications of the laboratories should be conducted using efficient project and change management approaches to maximize the opportunities for successful completion of the project. This review aims at presenting a general overview of project management with an emphasis on selected critical aspects. Conventional project management tools and models, such as HERMES, described in the literature, associated personal experience, and educational courses on management have been used to illustrate this review. This review presents general guidelines of project management and highlights their importance for microbiology diagnostic laboratories. As an example, some critical aspects of project management will be illustrated with a project of automation, as experienced at the laboratories of bacteriology and hygiene of the University Hospital of Lausanne. It is important to define clearly beforehand the objective of a project, its perimeter, its costs, and its time frame including precise duration estimates of each step. Then, a project management plan including explanations and descriptions on how to manage, execute, and control the project is necessary to continuously monitor the progression of a project to achieve its defined goals. Moreover, a thorough risk analysis with contingency and mitigation measures should be performed at each phase of a project to minimize the impact of project failures. The increasing complexities of modern laboratories mean clinical microbiologists must use several management tools including project and change management to improve the outcome of major projects and activities. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  4. Ice Sheet Model Intercomparison Project (ISMIP6) contribution to CMIP6

    NARCIS (Netherlands)

    Nowicki, Sophie M J; Payne, Anthony; Larour, Eric; Seroussi, Helene; Goelzer, Heiko|info:eu-repo/dai/nl/412549123; Lipscomb, William; Gregory, Jonathan; Abe-Ouchi, Ayako; Shepherd, Andrew

    2016-01-01

    Reducing the uncertainty in the past, present, and future contribution of ice sheets to sea-level change requires a coordinated effort between the climate and glaciology communities. The Ice Sheet Model Intercomparison Project for CMIP6 (ISMIP6) is the primary activity within the Coupled Model

  5. Project ethics

    CERN Document Server

    Jonasson, Haukur Ingi

    2013-01-01

    How relevant is ethics to project management? The book - which aims to demystify the field of ethics for project managers and managers in general - takes both a critical and a practical look at project management in terms of success criteria, and ethical opportunities and risks. The goal is to help the reader to use ethical theory to further identify opportunities and risks within their projects and thereby to advance more directly along the path of mature and sustainable managerial practice.

  6. Integrated project support environments the ASPECT project

    CERN Document Server

    Brown, Alan W

    1991-01-01

    A major part of software engineering developments involve the use of computing tools which facilitate the management, maintenance, security, and building of long-scale software engineer projects. Consequently, there have been a proliferation of CASE tools and IPSES. This book looks at IPSES in general and the ASPECT project in particular, providing design and implementation details, as well as locating ASPECT in IPSE developments.Survey of integrated project support environments for more efficient software engineering**Description of a large scale IPSE--ASPECT**Evaluation of formal methods in

  7. Projected metastable Markov processes and their estimation with observable operator models

    International Nuclear Information System (INIS)

    Wu, Hao; Prinz, Jan-Hendrik; Noé, Frank

    2015-01-01

    The determination of kinetics of high-dimensional dynamical systems, such as macromolecules, polymers, or spin systems, is a difficult and generally unsolved problem — both in simulation, where the optimal reaction coordinate(s) are generally unknown and are difficult to compute, and in experimental measurements, where only specific coordinates are observable. Markov models, or Markov state models, are widely used but suffer from the fact that the dynamics on a coarsely discretized state spaced are no longer Markovian, even if the dynamics in the full phase space are. The recently proposed projected Markov models (PMMs) are a formulation that provides a description of the kinetics on a low-dimensional projection without making the Markovianity assumption. However, as yet no general way of estimating PMMs from data has been available. Here, we show that the observed dynamics of a PMM can be exactly described by an observable operator model (OOM) and derive a PMM estimator based on the OOM learning

  8. Structuring a mega-project

    Energy Technology Data Exchange (ETDEWEB)

    Kutryk, T. [Husky Oil Operations Ltd., Calgary, AB (Canada)

    2004-07-01

    This paper presented an overview of mega-project management. Issues concerning scope, cost and schedule were discussed, with reference to the idea that a choice must be made from the outset as to which of the 3 is a main priority. The importance of preparation and the development of a fully resourced plan was emphasized. The use of the parametric 4-D model was discussed. Lessons that the construction industry may learn from manufacturers were presented along with issues of contract development and the role and importance of the project manager. Issues concerning performance measurement were reviewed, including lagging indicators. Project division factors were also discussed, with reference to data lags, naturally concurrent processes and over the fence units. A case study of Walmart was presented. Project design packages and long lead time items were discussed, as were issues concerning human resources. Functional units were examined in relation to zones of influence and unit integration. Various combinations of zones of influence were presented. Issues concerning span of control and varying relationships within a project were discussed. It was emphasized that great deeds can be accomplished by attracting the best people. tabs., figs.

  9. A real option-based model to valuate CDM projects under uncertain energy policies for emission trading

    International Nuclear Information System (INIS)

    Park, Taeil; Kim, Changyoon; Kim, Hyoungkwan

    2014-01-01

    Highlights: • A real option-based model for the valuation of CDM projects is proposed. • This study investigates the impact of energy policies on the value of CDM projects. • Level of target emission and its schedule should be carefully designed. • Government subsidy facilitates the implementation of CDM projects. • Period for free emission allowance prevents promoting CDM projects. - Abstract: Emission trading has been considered a primary policy tool for emission reduction. Governments establish national targets for emission reduction and assign emission reduction goals to private entities to accomplish the targets. To attain the goal, private entities should perform offset projects that can produce emission credits or buy emission credits from the market. However, it is not easy for private entities to decide to implement the projects because energy policies associated with emission trading keep changing; thus, the future benefits of the offset projects are quite uncertain. This study presents a real option-based model to investigate how uncertain energy policies affect the financial viability of an offset project. A case study showed that the establishment of a target emission was attractive to the government because it could make the CDM project financially viable with a small amount of government subsidy. In addition, the level of the government subsidy could determine the investment timing for the CDM project. In this context, governments should be cautious in designing energy policies, because even the same energy policies could have different impacts on private entities. Overall, this study is expected to assist private entities in establishing proper investment strategies for CDM projects under uncertain energy policies

  10. Embedding Systems Thinking into EWB Project Planning and Development: Assessing the Utility of a Group Model Building Approach

    Directory of Open Access Journals (Sweden)

    Kimberly Pugel

    2017-11-01

    Full Text Available Amongst growing sociotechnical efforts, engineering students and professionals both in the international development sector and industry are challenged to approach projects more holistically to achieve project goals.  Engineering service learning organizations must similarly adapt their technological projects to consider varying cultural and economic structures, ensuring more resilient social progress within development efforts.  In practice, systems thinking approaches can be utilized to model the social, economic, political, and technological implications that influence the sustainability of an engineering project. This research assesses the utility of integrating systems thinking into Engineers Without Borders (EWB project planning and development, thereby improving project impact and more effectively engaging members.  At a workshop held at an EWB-USA 2016 Regional Conference, the authors presented a planning and evaluation framework that applies group model building with system dynamics to foster systems thinking through factor diagramming and analysis. To assess the added value of the framework for EWB project planning and development, extensive participant feedback was gathered and evaluated during the workshop and through an optional post-workshop survey.  Supported by thoughtful observations and feedback provided by the EWB members, the model building workshop appeared to help participants reveal and consider project complexities by both visually and quantitatively identifying key non-technical and technical factors that influence project sustainability.  Therefore, system dynamics applied in a group model building workshop offers a powerful supplement to traditional EWB project planning and assessment activities, providing a systems-based tool for EWB teams and partner communities to build capacity and create lasting change.

  11. ASEAN projects reviewed.

    Science.gov (United States)

    1980-01-01

    The ASEAN Population Expert Group met in Manila and was followed by a meeting of the ASEAN heads of population programs, during the period November 5-10, 1979. Heads of population programs from Indonesia, Malaysia, Singapore, Thailand, and the Philippines attended. The meetings were held to review progress-to-date on phase 1 projects and to consider the development of an expanded population program. 5 projects funded by UNFPA are reviewed in tabular form with the project, the sponsoring country, date of implementation, data analysis, and date of completion. Suggestions were made for improving and extending these projects and it was also suggested that all projects being developed and proposed should include a section on use of research. 7 new projects were proposed as phase 2 projects. The 1st, sponsored by Malaysia, deals with women in development; project 2, lead by Thailand, will investigate population movement and its effect on development; project 3, led by the Philippines, will develop and strengthen national population information systems and networks in ASEAN countries; project 4, led by Indonesia, is directed towards institutional development and exchanges of personnel; project 5, led by the Philippines, will examine population and development dynamics and the man/resources balance; project 6, led by Thailand, will develop ASEAN social indicators; and project 7, led by Indonesia and Malaysia, will make a comprehensive analysis of existing medical/health care and family planning systems. It was recommended that an executive director of the proposed ASEAN population coordination unit should be appointed to expedite the recommendations of the meeting related to preparation and submission of phase 2 project proposals.

  12. Parkinson's Law and Its Implications for Project Management

    OpenAIRE

    Genaro J. Gutierrez; Panagiotis Kouvelis

    1991-01-01

    Critical path models concerning project management (i.e. PERT/CPM) fail to account for work force behavioral effects on the expected project completion time. In this paper, we provide a modelling framework for project management activities, that ultimately accounts for expected worker behavior under Parkinson's Law. A stochastic activity completion time model is used to formally state Parkinson's Law. The developed model helps to examine the effects of information release policies on subcontr...

  13. Projection of greenhouse gases 2016-2035

    DEFF Research Database (Denmark)

    Nielsen, Ole-Kenneth; Plejdrup, Marlene Schmidt; Winther, Morten

    2017-01-01

    The report contains a description of models, background data and projections of CO2, CH4, N2O, HFCs, PFCs and SF6 for Denmark. The emissions are projected to 2035 using a ‘with measures’ scenario. Official Danish forecasts of activity rates are used in the models for those sectors for which forec...

  14. Impact of Stakeholder Psychological Empowerment on Project Success

    Directory of Open Access Journals (Sweden)

    Herry Pintardi Chandra

    2011-05-01

    Full Text Available The relationship between psychological empowerment of stakeholders and project success is an important thing that must be known by project manager. This research developed and tested the model to predict how well the impact of stakeholder psychological empowerment on project success. Stakeholder psychological empowerment was defined to have five indicator variables covering intrinsic motivation, opportunity to perform, ability to perform, task behaviors, and contextual behaviors. Meanwhile, project success can be measured by cost performance, time performance, quality performance, profitability, and customer satisfaction. In this study, it was hypothesized that stakeholder psychological empowerment influenced project success. Based on the data obtained from a questionnaire survey carried out to 204 respondents, structural equation modeling (SEM was used for predicting the performance of project success. It was found that stakeholder psychological empowerment influenced project success, especially on the ability to perform of stakeholders.

  15. A combined AHP-GP model to allocate internal auditing time to projects

    Directory of Open Access Journals (Sweden)

    HA Kruger

    2006-06-01

    Full Text Available The optimal allocation of internal auditing time among competing projects is a multi-criteria problem that includes both qualitative and quantitative factors. This paper discusses an integrated approach where the analytic hierarchy process (AHP is used to deal with qualitative risk assessments and a goal programming (GP model to distribute available hours in such a way that risk is minimised. Additional considerations, such as maximum and minimum allowable project hours, risk reducing factors and risk levels, are also taken into account. Following a description of the models and framework, a brief case study is presented in which the framework was empirically evaluated.

  16. GMMIP (v1.0) contribution to CMIP6: Global Monsoons Model Inter-comparison Project

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Tianjun; Turner, Andrew G.; Kinter, James L.; Wang, Bin; Qian, Yun; Chen, Xiaolong; Wu, Bo; Wang, Bin; Liu, Bo; Zou, Liwei; He, Bian

    2016-10-10

    The Global Monsoons Model Inter-comparison Project (GMMIP) has been endorsed by the panel of Coupled Model Inter-comparison Project (CMIP) as one of the participating model inter-comparison projects (MIPs) in the sixth phase of CMIP (CMIP6). The focus of GMMIP is on monsoon climatology, variability, prediction and projection, which is relevant to four of the “Grand Challenges” proposed by the World Climate Research Programme. At present, 21 international modeling groups are committed to joining GMMIP. This overview paper introduces the motivation behind GMMIP and the scientific questions it intends to answer. Three tiers of experiments, of decreasing priority, are designed to examine (a) model skill in simulating the climatology and interannual-to-multidecadal variability of global monsoons forced by the sea surface temperature during historical climate period; (b) the roles of the Interdecadal Pacific Oscillation and Atlantic Multidecadal Oscillation in driving variations of the global and regional monsoons; and (c) the effects of large orographic terrain on the establishment of the monsoons. The outputs of the CMIP6 Diagnostic, Evaluation and Characterization of Klima experiments (DECK), “historical” simulation and endorsed MIPs will also be used in the diagnostic analysis of GMMIP to give a comprehensive understanding of the roles played by different external forcings, potential improvements in the simulation of monsoon rainfall at high resolution and reproducibility at decadal timescales. The implementation of GMMIP will improve our understanding of the fundamental physics of changes in the global and regional monsoons over the past 140 years and ultimately benefit monsoons prediction and projection in the current century.

  17. Project Half Double

    DEFF Research Database (Denmark)

    Svejvig, Per; Ehlers, Michael; Adland, Karoline Thorp

    activities carried out within the framework of the projects. The formal part of Project Half Double was initiated in June 2015. We started out by developing, refining and testing the Half Double methodology on seven pilot projects in the first phase of the project, which will end June 2016. The current......Project Half Double has a clear mission to succeed in finding a project methodology that can increase the success rate of our projects while increasing the speed at which we generate new ideas and develop new products and services. Chaos and complexity should be seen as a basic condition...... and as an opportunity rather than a threat and a risk. We are convinced that by doing so, we can strengthen Denmark’s competitiveness and play an important role in the battle for jobs and future welfare. The overall goal is to deliver “projects in half the time with double the impact”, where projects in half the time...

  18. De Sitter projective relativity

    CERN Document Server

    Licata, Ignazio; Benedetto, Elmo

    2017-01-01

    This book presents the Projective approach to de Sitter Relativity. It traces the development of renewed interest in models of the universe at constant positive curvature such as "vacuum" geometry. The De Sitter Theory of Relativity, formulated in 1917 with Willem De Sitter's solution of the Einstein equations, was used in different fields during the 1950s and 1960s, in the work of H. Bacry, J.M. LevyLeblond and F.Gursey, to name some important contributors. From the 1960s to 1980s, L. Fantappié and G. Arcidiacono provided an elegant group approach to the De Sitter universe putting the basis for special and general projective relativity. Today such suggestions flow into a unitary scenario, and this way the De Sitter Relativity is no more a "missing opportunity" (F. Dyson, 1972), but has a central role in theoretical physics. In this volume a systematic presentation is given of the De Sitter Projective relativity, with the recent developments in projective general relativity and quantum cosmology.

  19. [Transparency as a prerequisite of innovation in health services research: deficits in the reporting of model projects concerning managed care].

    Science.gov (United States)

    Wiethege, J; Ommen, O; Ernstmann, N; Pfaff, H

    2010-10-01

    Currently, elements of managed care are being implemented in the German health-care system. The legal basis for these innovations are § 140, § 73, § 137, and §§ 63 et seq. of the German Social Code - Part 5 (SGB V). For the model projects according to §§ 63 et seq. of the German Social Code a scientific evaluation and publication of the evaluation results is mandatory. The present study examines the status of evaluation of German model projects. The present study has a mixed method design: A mail and telephone survey with the German Federal Social Insurance Authority, the health insurance funds, and the regional Associations of Statutory Health Insurance Physicians has been conducted. Furthermore, an internet research on "Medpilot" and "Google" has been accomplished to search for model projects and their evaluation reports. 34 model projects met the inclusion criteria. 13 of these projects had been terminated up to 30/9/2008. 6 of them have published an evaluation report. 4 model projects have published substantial documents. One model project in progress has published a meaningful interim report. 12 model projects failed to give information concerning the evaluator or the duration of the model projects. The results show a significant deficit in the mandatory reporting of the evaluation of model projects in Germany. There is a need for action for the legislator and the health insurance funds in terms of promoting the evaluation and the publication of the results. The institutions evaluating the model projects should obligate themselves to publish the evaluation results. The publication is an essential precondition for the development of managed care structures in the health-care system and in the development of scientific evaluation methods. © Georg Thieme Verlag KG Stuttgart · New York.

  20. Derivatives in energy project finance

    International Nuclear Information System (INIS)

    Spencer, Lloyd

    1999-01-01

    This chapter focuses on risk management of merchant power generation projects and describes project finance as balancing risk and reward over time. The historical background to risk management is traced, and the case for derivatives in energy project finance is put forward with the hedging of forward output, and forwards and power purchase agreements discussed. Current and prospective usage, and the implementation issues of market liquidity, margin calls, letters of credit, derivative counterparty credit risk, and accounting policy are considered. A detailed example of a gas-fired plant in the US is presented with details given of the distribution of project earnings before tax. Oil field operating cashflows are examined, with reserved flow models, leverage effects, and price hedging addressed

  1. Capital projects coordination

    Directory of Open Access Journals (Sweden)

    Zubović Jovan

    2004-01-01

    Full Text Available This paper looks at the difficulties of managing modem capital projects and endeavors to reduce the complexities to simpler and more understandable terms. It examines the project environment, defines project management and discusses points of difference from traditional management. In the second part of the paper are presented fundamentals for project success for different types of projects.

  2. Network models for solving the problem of multicriterial adaptive optimization of investment projects control with several acceptable technologies

    Science.gov (United States)

    Shorikov, A. F.; Butsenko, E. V.

    2017-10-01

    This paper discusses the problem of multicriterial adaptive optimization the control of investment projects in the presence of several technologies. On the basis of network modeling proposed a new economic and mathematical model and a method for solving the problem of multicriterial adaptive optimization the control of investment projects in the presence of several technologies. Network economic and mathematical modeling allows you to determine the optimal time and calendar schedule for the implementation of the investment project and serves as an instrument to increase the economic potential and competitiveness of the enterprise. On a meaningful practical example, the processes of forming network models are shown, including the definition of the sequence of actions of a particular investment projecting process, the network-based work schedules are constructed. The calculation of the parameters of network models is carried out. Optimal (critical) paths have been formed and the optimal time for implementing the chosen technologies of the investment project has been calculated. It also shows the selection of the optimal technology from a set of possible technologies for project implementation, taking into account the time and cost of the work. The proposed model and method for solving the problem of managing investment projects can serve as a basis for the development, creation and application of appropriate computer information systems to support the adoption of managerial decisions by business people.

  3. SDN Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories Inc, Pullman, WA (United States)

    2016-12-23

    technology and operational technology engineers, to be the ones centrally administering the technology and responding to events; Simplifies network configuration, improving deterministic Ethernet transport times, and providing instant visualization on where the communication circuits are and how all circuits are impacted when changes (e.g., configuration changes, failures or intrusions) happen, allowing operators to minimize downtime; and Improves the ability to identify deviations in network behavior resulting in detection and analysis of potential cyber intrusions and faster response times Results: This project has forever changed the way critical infrastructure networks are designed, secured, deployed and maintained. The cybersecurity and performance advantages achieved are significant, simply put traditional networking has been obsoleted while the team maintained Ethernet interoperability avoiding any legacy concerns. The team commercially released technology that accomplished all the cybersecurity goals outlined in the SOPO and completed it by executing the project management plan approved in the initial contract. The resulting Energy sector SDN flow controller model number is SEL-5056 and can be freely downloaded from the www.SELinc.com website. This technology not only improves the cybersecurity of control systems but has measured results that it improves the performance and reliability of the control system as well. This means the system owners can confidently apply it to their systems knowing that it will, “first do no harm” but actually improve the system as well. Success of the project is best measured by the sales and deployment of the technology. System owners in industrial, electric, defense, and oil and gas only months after commercial release have approved plans for deployment.

  4. Housing Value Projection Model Related to Educational Planning: The Feasibility of a New Methodology. Final Report.

    Science.gov (United States)

    Helbock, Richard W.; Marker, Gordon

    This study concerns the feasibility of a Markov chain model for projecting housing values and racial mixes. Such projections could be used in planning the layout of school districts to achieve desired levels of socioeconomic heterogeneity. Based upon the concepts and assumptions underlying a Markov chain model, it is concluded that such a model is…

  5. Marine radioecology. Annual report 1996. Project plan 1997

    International Nuclear Information System (INIS)

    1997-06-01

    The project plan for the EKO-1 project states that 'the main aim of the EKO-1 project is to enable faster and better assessments to be made of the effects of releases of radionuclides into the marine environment'. To meet this goal the main parts of the project were defined as follows: Model work - Identifying parameters of main interest including estimating and validating the values of these parameters; Research - Field studies, environments typical for various Nordic regions, environments with special physical or chemical characteristics. Laboratory studies; Dissemination of information - Seminars, reports, articles. During the project period emphasis has also been put on quality issues concerning sampling and analysis. The project work has progressed in accordance with project plans in 1996 and within the set budget. In modelling a parameter sensitivity analysis was carried out for a radiological assessment model used for the prediction of doses to man from dumping of radioactive waste in the Kara Sea. Doses to man were found to be generally dominated by contributions from long-lived transuranic radionuclides (plutonium and americium) which associate readily with sediments. Sediment related processes and parameters show therefore high sensitivities, especially at long distances (e.g. Barents Sea). Within the EKO-1 project there has been emphasis on encouraging the Nordic aspect of sediment research in spite of the limitations set by nationally run sampling projects. The EKO-1 project has managed this by e.g.: Organizing exchange of samples for analysis links with the EKO-2.3 project ('Limnic systems'). (EG) 52 refs

  6. Project W-320 thermal hydraulic model benchmarking and baselining

    International Nuclear Information System (INIS)

    Sathyanarayana, K.

    1998-01-01

    Project W-320 will be retrieving waste from Tank 241-C-106 and transferring the waste to Tank 241-AY-102. Waste in both tanks must be maintained below applicable thermal limits during and following the waste transfer. Thermal hydraulic process control models will be used for process control of the thermal limits. This report documents the process control models and presents a benchmarking of the models with data from Tanks 241-C-106 and 241-AY-102. Revision 1 of this report will provide a baselining of the models in preparation for the initiation of sluicing

  7. A rapid parallelization of cone-beam projection and back-projection operator based on texture fetching interpolation

    Science.gov (United States)

    Xie, Lizhe; Hu, Yining; Chen, Yang; Shi, Luyao

    2015-03-01

    Projection and back-projection are the most computational consuming parts in Computed Tomography (CT) reconstruction. Parallelization strategies using GPU computing techniques have been introduced. We in this paper present a new parallelization scheme for both projection and back-projection. The proposed method is based on CUDA technology carried out by NVIDIA Corporation. Instead of build complex model, we aimed on optimizing the existing algorithm and make it suitable for CUDA implementation so as to gain fast computation speed. Besides making use of texture fetching operation which helps gain faster interpolation speed, we fixed sampling numbers in the computation of projection, to ensure the synchronization of blocks and threads, thus prevents the latency caused by inconsistent computation complexity. Experiment results have proven the computational efficiency and imaging quality of the proposed method.

  8. Improving Sustainability Performance for Public-Private-Partnership (PPP Projects

    Directory of Open Access Journals (Sweden)

    Liyin Shen

    2016-03-01

    Full Text Available Improving sustainability performance in developing infrastructure projects is an important strategy for pursuing the mission of sustainable development. In recent years, the business model of public-private-partnership (PPP is promoted as an effective approach in developing infrastructure projects. It is considered that the distribution of the contribution on project investment between private and public sectors is one of the key variables affecting sustainability performance of PPP-type projects. This paper examines the impacts of the contribution distribution between public and private sectors on project sustainability performance. A model named the sustainability performance-based evaluation model (SPbEM is developed for assisting the assessment of the level of sustainability performance of PPP projects. The study examines the possibility of achieving better sustainability through proper arrangement of the investment distribution between the two primary sectors in developing PPP-type infrastructure projects.

  9. Demographic models and IPCC climate projections predict the decline of an emperor penguin population

    Science.gov (United States)

    Jenouvrier, Stéphanie; Caswell, Hal; Barbraud, Christophe; Holland, Marika; Strœve, Julienne; Weimerskirch, Henri

    2009-01-01

    Studies have reported important effects of recent climate change on Antarctic species, but there has been to our knowledge no attempt to explicitly link those results to forecasted population responses to climate change. Antarctic sea ice extent (SIE) is projected to shrink as concentrations of atmospheric greenhouse gases (GHGs) increase, and emperor penguins (Aptenodytes forsteri) are extremely sensitive to these changes because they use sea ice as a breeding, foraging and molting habitat. We project emperor penguin population responses to future sea ice changes, using a stochastic population model that combines a unique long-term demographic dataset (1962–2005) from a colony in Terre Adélie, Antarctica and projections of SIE from General Circulation Models (GCM) of Earth's climate included in the most recent Intergovernmental Panel on Climate Change (IPCC) assessment report. We show that the increased frequency of warm events associated with projected decreases in SIE will reduce the population viability. The probability of quasi-extinction (a decline of 95% or more) is at least 36% by 2100. The median population size is projected to decline from ≈6,000 to ≈400 breeding pairs over this period. To avoid extinction, emperor penguins will have to adapt, migrate or change the timing of their growth stages. However, given the future projected increases in GHGs and its effect on Antarctic climate, evolution or migration seem unlikely for such long lived species at the remote southern end of the Earth. PMID:19171908

  10. The Model of Lake Operation in Water Transfer Projects Based on the Theory of Water- right

    Science.gov (United States)

    Bi-peng, Yan; Chao, Liu; Fang-ping, Tang

    the lake operation is a very important content in Water Transfer Projects. The previous studies have not any related to water-right and water- price previous. In this paper, water right is divided into three parts, one is initialization waterright, another is by investment, and the third is government's water- right re-distribution. The water-right distribution model is also build. After analyzing the cost in water transfer project, a model and computation method for the capacity price as well as quantity price is proposed. The model of lake operation in water transfer projects base on the theory of water- right is also build. The simulation regulation for the lake was carried out by using historical data and Genetic Algorithms. Water supply and impoundment control line of the lake was proposed. The result can be used by south to north water transfer projects.

  11. Systematic design for trait introgression projects

    OpenAIRE

    Cameron, John N.; Han, Ye; Wang, Lizhi; Beavis, William D.

    2017-01-01

    Key message Using an Operations Research approach, we demonstrate design of optimal trait introgression projects with respect to competing objectives. Abstract We demonstrate an innovative approach for designing Trait Introgression (TI) projects based on optimization principles from Operations Research. If the designs of TI projects are based on clear and measurable objectives, they can be translated into mathematical models with decision variables and constraints that can be translated into ...

  12. Do projections from bioclimatic envelope models and climate change metrics match?

    DEFF Research Database (Denmark)

    Garcia, Raquel A.; Cabeza, Mar; Altwegg, Res

    2016-01-01

    as indicators of the exposure of species to climate change. Here, we investigate whether these two approaches provide qualitatively similar indications about where biodiversity is potentially most exposed to climate change. Location: Sub-Saharan Africa. Methods: We compared a range of climate change metrics...... for sub-Saharan Africa with ensembles of bioclimatic envelope models for 2723 species of amphibians, snakes, mammals and birds. For each taxonomic group, we performed three comparisons between the two approaches: (1) is projected change in local climatic suitability (models) greater in grid cells...... between the two approaches was found for all taxonomic groups, although it was stronger for species with a narrower climatic envelope breadth. Main conclusions: For sub-Saharan African vertebrates, projected patterns of exposure to climate change given by climate change metrics alone were qualitatively...

  13. GEAR UP Aspirations Project Evaluation

    Science.gov (United States)

    Trimble, Brad A.

    2013-01-01

    The purpose of this study was to conduct a formative evaluation of the first two years of the Gaining Early Awareness and Readiness for Undergraduate Programs (GEAR UP) Aspirations Project (Aspirations) using a Context, Input, Process, and Product (CIPP) model so as to gain an in-depth understanding of the project during the middle school…

  14. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  15. ROLL OUT THE TALENT : Final project report

    OpenAIRE

    Eerola, Tuomas; Tuominen, Pirjo; Hakkarainen, Riitta-Liisa; Laurikainen, Marja; Mero, Niina

    2014-01-01

    The ROLL OUT THE TALENT project was born out of the desire to recognise and support the strengths of vocational students and to develop new and innovative operating models. ROLL OUT THE TALENT promoted regional cooperation between institutes and companies. The project produced operating and study path models that take into consideration the individual strengths of vocational students and the principles of lifelong learning. This is the final report of the ROLL OUT THE TALENT project, and ...

  16. Development of Export Control Comprehensive Management Model for Nuclear Power Plants and Others Projects

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Chansuh; Seo, Hana; Choi, Sundo [Korea Institute of Nuclear Nonproliferation And Control, Daejeon (Korea, Republic of)

    2014-05-15

    It is required that there are lots of managements of care and concern if the project contains strategic items such as NPPs. The Korean nuclear industry and its related companies, such as the Korea Hydro and Nuclear Power (KHNP), are promoting greater exports of NPPs. It is likely that Korea will export more this technology to newcomer states in the future. As a result, the ROK has been improving its export control management system for NPPs. In keeping with this national effort, Korea Institute of Nuclear Nonproliferation And Control (KINAC) developed comprehensive export control management model for NPPs and other projects, in preparation for this projected growth in the industry. This model also applies to the nuclear export case of the UAE, aims to manage the project from bidding to the end of the contract. The recent Export Licensing of Nuclear Facility Technology was reflected in the Notice on Export and Import of Strategic Items in January 2014. Through this license, the large-scale project legislation framework was established. It can also minimize nonproliferation concerns of the international community through strict management. It is expected that the Korea will be able to enhance transparency and secure the nuclear use, while meeting nonproliferation purpose.

  17. Ranking environmental projects model based on multicriteria decision-making and the weight sensitivity analysis

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    With the fast growth of Chinese economic,more and more capital will be invested in environmental projects.How to select the environmental investment projects(alternatives)for obtaining the best environmental quality and economic benefits is an important problem for the decision makers.The purpose of this paper is to develop a decision-making model to rank a finite number of alternatives with several and sometimes conflicting criteria.A model for ranking the projects of municipal sewage treatment plants is proposed by using exports' information and the data of the real projects.And,the ranking result is given based on the PROMETHEE method. Furthermore,by means of the concept of the weight stability intervals(WSI),the sensitivity of the ranking results to the size of criteria values and the change of weights value of criteria are discussed.The result shows that some criteria,such as"proportion of benefit to projoct cost",will influence the ranking result of alternatives very strong while others not.The influence are not only from the value of criterion but also from the changing the weight of criterion.So,some criteria such as"proportion of benefit to projoct cost" are key critera for ranking the projects. Decision makers must be cautious to them.

  18. Development of Export Control Comprehensive Management Model for Nuclear Power Plants and Others Projects

    International Nuclear Information System (INIS)

    Lee, Chansuh; Seo, Hana; Choi, Sundo

    2014-01-01

    It is required that there are lots of managements of care and concern if the project contains strategic items such as NPPs. The Korean nuclear industry and its related companies, such as the Korea Hydro and Nuclear Power (KHNP), are promoting greater exports of NPPs. It is likely that Korea will export more this technology to newcomer states in the future. As a result, the ROK has been improving its export control management system for NPPs. In keeping with this national effort, Korea Institute of Nuclear Nonproliferation And Control (KINAC) developed comprehensive export control management model for NPPs and other projects, in preparation for this projected growth in the industry. This model also applies to the nuclear export case of the UAE, aims to manage the project from bidding to the end of the contract. The recent Export Licensing of Nuclear Facility Technology was reflected in the Notice on Export and Import of Strategic Items in January 2014. Through this license, the large-scale project legislation framework was established. It can also minimize nonproliferation concerns of the international community through strict management. It is expected that the Korea will be able to enhance transparency and secure the nuclear use, while meeting nonproliferation purpose

  19. Model and Algorithm for Substantiating Solutions for Organization of High-Rise Construction Project

    Directory of Open Access Journals (Sweden)

    Anisimov Vladimir

    2018-01-01

    Full Text Available In the paper the models and the algorithm for the optimal plan formation for the organization of the material and logistical processes of the high-rise construction project and their financial support are developed. The model is based on the representation of the optimization procedure in the form of a non-linear problem of discrete programming, which consists in minimizing the execution time of a set of interrelated works by a limited number of partially interchangeable performers while limiting the total cost of performing the work. The proposed model and algorithm are the basis for creating specific organization management methodologies for the high-rise construction project.

  20. Model and Algorithm for Substantiating Solutions for Organization of High-Rise Construction Project

    Science.gov (United States)

    Anisimov, Vladimir; Anisimov, Evgeniy; Chernysh, Anatoliy

    2018-03-01

    In the paper the models and the algorithm for the optimal plan formation for the organization of the material and logistical processes of the high-rise construction project and their financial support are developed. The model is based on the representation of the optimization procedure in the form of a non-linear problem of discrete programming, which consists in minimizing the execution time of a set of interrelated works by a limited number of partially interchangeable performers while limiting the total cost of performing the work. The proposed model and algorithm are the basis for creating specific organization management methodologies for the high-rise construction project.