  1. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  2.  Project Management as a Global Trend for Organization Work

    DEFF Research Database (Denmark)

    Kampf, Constance

    in multination and global companies, understanding the power of visual rhetoric, genre and writing processes in the context of project management documentation can be an advantage for technical communicators.  In addition, project management tools and online documentation spaces are objects which cross...... Project Management as a Global Trend for Organization Work: Implications for Technical Communication Project Management tools and processes offer a visual approach to producing knowledge about a project in order to complete it.  As project management practices are used with increasing frequency......-cultural teams use to function.  This presentation will explore the potential of Project Management to be tightly integrated in Technical Communication curricula through a communications approach to project management.  Questions for discussion include: How tightly is project management integrated into different...

  3. 36 CFR 327.30 - Shoreline Management on Civil Works Projects.

    Science.gov (United States)

    2010-07-01

    ... ADMINISTERED BY THE CHIEF OF ENGINEERS § 327.30 Shoreline Management on Civil Works Projects. (a) Purpose. The... this regulation, shoreline management plans are not required for those projects where construction was... approval, one copy of each project Shoreline Management Plan will be forwarded to HQUSACE (CECW-ON) WASH DC...

  4. A project management focused framework for assuring quality work processes

    Energy Technology Data Exchange (ETDEWEB)

    Gamsby, S.O.; Mize, J.D. [Allied Signal, Inc., Albuquerque, NM (United States). Federal Mfg. and Technologies; Reid, R.A. [New Mexico Univ., Albuquerque, NM (United States)

    1996-10-01

    Federal Manufacturing & Technologies/New Mexico (FM&T/NM) of AlliedSignal is an organization of approximately 300 associates providing operations support, engineering, and other technical services for DOE, New Mexico`s National Laboratories, etc. Work performed is primarily project-oriented and ranges from executing a major long-term contract for retrofitting and maintaining a large fleet of escort vehicles to creating a single, small, prototype electronic device for measuring radiation in a unique environment. FM&T/NM is functionally organized and operates in a classic matrix format with functional departments providing personnel with technical expertise, necessary physical resources, and administrative support to several project-based groups. Like most matrix-based organizations that provide support to diverse customers, FM&T/NM has encountered problems that occur when a group of project managers is expected to work together in using and scheduling a shared set of limited resources for the good of the organization as a whole. The framework for managing projects that we present focuses on developing, understanding, and managing the relationships between the functional organization structure, the system of work processes, and the management of projects. FM&T/NM retains its functional structure which primarily assigns personnel to work processes. The evolving role of the process leader focuses primarily on designing, managing, and improving the process, and the interactions among the subprocesses. The project manager is responsible for (1) translating customer requirements into product specifications, (2) determining the sequence of activities needed to meet project goals, (3) scheduling the required work processes, (4) monitoring project progress, (5) providing liaison between the customer and process leaders, and (6) having the desired product and/or service delivered to a satisfied customer in a timely manner.

  5. IMPLEMENTATION OF WORK LIFE QUALITY PROGRAMS WITH THE PROJECT MANAGEMENT MODEL

    Directory of Open Access Journals (Sweden)

    Maria Lúcia Granja Coutinho

    2010-06-01

    Full Text Available The research studies the implementation of Quality of Working Life (QWL programs using project management techniques. Quality of Work Life projects have undergone a constant increase in scope to the point where they currently involve such diverse themes as change in dietary habits, exercise, stress management, socio environmental responsibility, and adult education. The major focus of this research is to analyze the processes and knowledge areas of project management being used to deal with this increased scope. The managerial processes identified were divided into categories of preparation, structuring, execution, and conclusion. The knowledge areas studied were: communication, risks, human resources, and acquisitions. The firms studied included mid to large sized firms located in the north, southeast and south of Brazil. We interviewed managers, directors, CEOs, plant managers, and line managers as part of this effort. The results suggest that the project management practices used were ad hoc and based on day to day needs. They also suggest that sound project management practices are applicable to QWL programs in the firms we studied.

  6. Work Breakdown Structures The Foundation for Project Management Excellence

    CERN Document Server

    Norman, Eric S; Fried, Robert T

    2011-01-01

    Understand and apply new concepts regarding Work Breakdown Structures The Work Breakdown Structure (WBS) has emerged as a foundational concept and tool in Project Management. It is an enabler that ensures clear definition and communication of project scope while performing a critical role as a monitoring and controlling tool. Created by the three experts who led the development of PMI's Practice Standard for Work Breakdown Structures, Second Edition, this much-needed text expands on what the standard covers and describes how to go about successfully implementing the WBS within the project life

  7. Waste management project fiscal year 1998 multi-year work plan WBS 1.2

    International Nuclear Information System (INIS)

    Slaybaugh, R.R.

    1997-08-01

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project

  8. Waste management project fiscal year 1998 multi-year work plan WBS 1.2

    Energy Technology Data Exchange (ETDEWEB)

    Slaybaugh, R.R.

    1997-08-29

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project.

  9. Cesium legacy safety project management work plan

    International Nuclear Information System (INIS)

    Durham, J.S.

    1998-01-01

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell)

  10. DIPLOMA PROJECT TEAM WORK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    V. S. Kruglyk

    2014-04-01

    Full Text Available During the work performance students should get the maximal approach to the process of real project execution, so the project should include the need to use the latest technology, integration of data or services with different developments, architecture design, interaction of the team members and others. Implementation of graduation projects is the useful activity for the acquisition and consolidation of key IT competencies. Since the task of educational projects is maximal close to real one, students participate almost in all typical stages of commercial product’s development, and do so successfully. This is also confirmed practically: students, who were actively engaged in some projects at the university, have key positions in IT companies of the city and country after that. The main objective of the paper is to describe the organization of a common group students’ work on a degree project, implementation peculiarity of such projects, recommendations for improving the quality of projects. Thus, the paper is devoted to the peculiarities of the joint students’ work on a project during diploma execution in IT specialties, as the final part of the acquisition and consolidation process of key IT competencies of future programmers. The problem of choosing work topic, project concept, work organization in a group, implementation process organization has been considered. Also the specific stages of software development have been considered: development of interface, choice of technology, product quality, project disposal to the next developers, project completion.

  11. Behavioural changes experienced by contract managers while working on remote project sites

    OpenAIRE

    2012-01-01

    M.B.A. This research project is concerned with the behavioural changes of contract managers while working on 'remote' project sites. While working on such a project, the researcher became aware that the behaviour of certain contract managers changed over the course of the project, and that this behaviour was not the same as they demonstrated when at home or in the office environment. In many instances these behavioural changes were of a negative nature, the consequences of which often resu...

  12. Nurse managers' challenges in project management.

    Science.gov (United States)

    Suhonen, Marjo; Paasivaara, Leena

    2011-11-01

    To analyse the challenges that nurse managers meet in project management. Project management done by nurse managers has a significant role in the success of projects conducted in work units. The data were collected by open interviews (n = 14). The participants were nurse managers, nurses and public health nurses. Data analysis was carried out using qualitative content analysis. The three main challenges nurse managers faced in project management in health-care work units were: (1) apathetic organization and management, (2) paralysed work community and (3) cooperation between individuals being discouraged. Nurse managers' challenges in project management can be viewed from the perspective of the following paradoxes: (1) keeping up projects-ensuring patient care, (2) enthusiastic management-effective management of daily work and (3) supporting the work of a multiprofessional team-leadership of individual employees. It is important for nurse managers to learn to relate these paradoxes to one another in a positive way. Further research is needed, focusing on nurse managers' ability to promote workplace spirituality, nurse managers' emotional intelligence and their enthusiasm in small projects. © 2011 Blackwell Publishing Ltd.

  13. Exploring organisational competences in Human Factors and UX project work: managing careers, project tactics and organisational strategy.

    Science.gov (United States)

    Furniss, Dominic; Curzon, Paul; Blandford, Ann

    2018-06-01

    Organisational competence in Human Factors and UX (user experience) has not been looked at before despite its relevance to project success. We define organisational competence as the collective competence of the individuals, bringing together their complementary abilities to deliver an outcome that is typically more than the sum of its parts. Twenty-two UX and Human Factors practitioners were interviewed about their project work in two contrasting domains: web design and safety-critical systems to explore organisational competences. Through doing a FRAM analysis, 29 functions and 6 main areas of competences were identified: the central project process; the process of learning about the problem; maintaining and developing client relations; staff development; evolving practices; and the management of documentation for audit and quality control. These dynamic and situated competences form a web of interactions. Managing competences is essential for project success. Implications for managing careers, project tactics and organisational strategy are discussed. Practitioner Summary: Organisational competences impact how routine and non-routine project work is performed, but these have received little attention in the literature. Six key areas of competences in Human Factors and UX project work were identified from practitioner interviews. Managing combinations of adaptive competences is important for developing careers, project tactics and organisational strategies.

  14. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  15. Waste Management Project fiscal year 1998 multi-year work plan, WBS 1.2

    International Nuclear Information System (INIS)

    Jacobsen, P.H.

    1997-01-01

    The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposal of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project, Liquid Effluents Project, and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible

  16. Designing Project Management

    NARCIS (Netherlands)

    Heintz, John Linke; Lousberg, L.; Wamelink, J.W.F.; Saari, A.; Huovinen, P.

    2016-01-01

    In this paper we introduce the concept of Designing Project Management. On the basis of our earlier work, we suggest that there is still a gap between what is known from recent project management literature and what project managers can structurally help in the effectiveness of their work. Assuming

  17. Replacement of the Project Manager Reflected Through Activity Theory and Work-System Theory

    Science.gov (United States)

    Vartiainen, Tero; Aramo-Immonen, Heli; Jussila, Jari; Pirhonen, Maritta; Liikamaa, Kirsi

    Replacement of the project manager (RPM) is a known phenomenon in information systems (IS) projects, but scant attention is given to it in the project management or IS literature. Given its critical effects on the project business, the organization, the project team, and the project manager, it should be studied in more depth. We identified factors which make RPM occurrences inherently different and we show that work-system theory and activity theory give comprehensive lenses to advance research on RPM. For the future research on RPM we identified three objectives: experiences on RPM, process model for RPM, and organizational culture's influence on RPM occurrences.

  18. The net effects of the Project NetWork return-to-work case management experiment on participant earnings, benefit receipt, and other outcomes.

    Science.gov (United States)

    Kornfeld, R; Rupp, K

    2000-01-01

    The Social Security Administration (SSA) initiated Project NetWork in 1991 to test case management as a means of promoting employment among persons with disabilities. The demonstration, which targeted Social Security Disability Insurance (DI) beneficiaries and Supplemental Security Income (SSI) applicants and recipients, offered intensive outreach, work-incentive waivers, and case management/referral services. Participation in Project NetWork was voluntary. Volunteers were randomly assigned to the "treatment" group or the "control" group. Those assigned to the treatment group met individually with a case or referral manager who arranged for rehabilitation and employment services, helped clients develop an individual employment plan, and provided direct employment counseling services. Volunteers assigned to the control group could not receive services from Project NetWork but remained eligible for any employment assistance already available in their communities. For both treatment and control groups, the demonstration waived specific DI and SSI program rules considered to be work disincentives. The experimental impact study thus measures the incremental effects of case and referral management services. The eight demonstration sites were successful in implementing the experimental design roughly as planned. Project NetWork staff were able to recruit large numbers of participants and to provide rehabilitation and employment services on a substantial scale. Most of the sites easily reached their enrollment targets and were able to attract volunteers with demographic characteristics similar to those of the entire SSI and DI caseload and a broad range of moderate and severe disabilities. However, by many measures, volunteers were generally more "work-ready" than project eligible in the demonstration areas who did not volunteer to receive NetWork services. Project NetWork case management increased average annual earnings by $220 per year over the first 2 years following

  19. Keynote presentation: Project Management, Technology and Evolving Work Processes

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    not be used in the workplace when students graduate, but rather on the ”engine” of problem solving and communication strategies which drives projects and affects project success from the stakeholders point of view. Once students understand the engine, they are able to not only use software tools...... management documents looked like, but also how these documents are interconnected and work together to solve a problem. In addition, as they were in communication with a real client, they needed to work iteratively, ch anging their understanding of the problem, which in turn changed their options for solving...... the problem as well as planning and communicating the solution. This dynamic participation in problem solving helped students gain experience beyond recognition and reproduction  Campus Encounters – Bridging Learners Conference “Developing Competences for Next Generation Service Sectors” April 13–14, 2011...

  20. A Model to Investigate the Effect of Work Ethic Culture on Dynamics of Rework in Management of Projects

    Directory of Open Access Journals (Sweden)

    Hossein Kiani

    2018-03-01

    Full Text Available The present study aims to investigate the effect of work ethic culture on rework in construction projects through a review of literature, surveys, and interviews with project managers. The main research question is what mechanisms can project manager use to balance the costs of personnel training, financial and language incentives, and implementation costs to finish the project with more profit and less rework. In this regard, modelling and data analysis is done using System Dynamics methodology. The results show that by considering work ethic, rework in the project is reduced from 46 % to 39 %. However, the project has been completed with 10 % lower cost and 26 % lower variance. Integrating the issue of rework with the culture of work ethic in the field of project management by at least one exogenous parameter has been studied, while in this study qualitative parameters have been converted to quantitative parameters using fuzzy inference system. The change in management approach to the issue of work ethics and the formulation of human resource strategies of large projects by human resource managers is one of the applications of this study.

  1. Earned value project management

    CERN Document Server

    Fleming, Quentin W

    2010-01-01

    Organizations that follow the principles of good Earned Value Management (EVM) create an environment that allows teams to successfully operate and thrive ? even in the face of challenges that could negatively impact their projects. Earned Value Project Management (EVPM) is a methodology used to measure and communicate the real physical progress of a project taking into account the work completed, the time taken and the costs incurred to complete that work. As a result, EVPM allows more educated and effective management decision-making, which helps evaluate and control project risk by measuring project progress in monetary terms. In the first two editions of Earned Value Project Management, Quentin W. Fleming and Joel M. Koppelman provided guidance for project management practitioners already familiar with EVPM, was well as those who were new to the use of this technique. The third edition expanded the information available on of EVPM for medium and smaller projects while still being relevant for larger projec...

  2. Introducing an Innovative Project Management Framework for First Year Students – Project Work in a PBL Environment

    DEFF Research Database (Denmark)

    Kofoed, Lise B.; Møller, Michael Labovic

    2010-01-01

    Students at Aalborg University (AAU) in Denmark are educated according to the Aalborg Problem Based Learning (PBL) approach which entails working in groups and completing a project each semester. In accordance with this approach students are offered a course – Co-operation, Learning and Project...... in general acknowledge the benefits of thorough project plans and schedules, they often experience difficulties developing them and abiding by them. These experienced difficulties are caused by lack of motivation and competence within this particular area of project management. This paper describes how a new...

  3. Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach

    NARCIS (Netherlands)

    Miao, Yongwu; Sloep, Peter; Koper, Rob

    2009-01-01

    Miao, Y., Sloep, P. B., & Koper, R. (2009). Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach. Presented at the 'Open workshop of TENCompetence - Rethinking Learning and Employment at a Time of Economic Uncertainty-event'. November, 19, 2009,

  4. Managing complex, high risk projects a guide to basic and advanced project management

    CERN Document Server

    Marle, Franck

    2016-01-01

    Maximizing reader insights into project management and handling complexity-driven risks, this book explores propagation effects, non-linear consequences, loops, and the emergence of positive properties that may occur over the course of a project. This book presents an introduction to project management and analysis of traditional project management approaches and their limits regarding complexity. It also includes overviews of recent research works about project complexity modelling and management as well as project complexity-driven issues. Moreover, the authors propose their own new approaches, new methodologies and new tools which may be used by project managers and/or researchers and/or students in the management of their projects. These new elements include project complexity definitions and frameworks, multi-criteria approaches for project complexity measurement, advanced methodologies for project management (propagation studies to anticipate potential behaviour of the project, and clustering approaches...

  5. MANAGING LARGE INVESTMENT PROJECTS IN GORJ

    Directory of Open Access Journals (Sweden)

    CÎRNU DORU

    2016-12-01

    Full Text Available Currently, the concept of project management is considered to be the best concept for efficient management of a project, so it is used all over the world, and most recently in our country. This concept is designed with all the general characteristics of project management, but adapted to the large investment projects. This paper presents the project management concept and project management organization for capital projects. This concept is conceived with all general characteristics of project management, but adopted to the condition of large investment projects. The concept also includes the project team and the project manager, the person authorized and responsible for achieving the objectives planned in the project. For efficient managing by project, it is necessary to insure a good compozition of project team, as a team of people who, in collaboration with project manager, work directly on managing the project. To effectively manage the project, it is necessary to ensure a proper composition of the project team, a team of people who, in collaboration with the project manager to work directly for project management. It is a particularly good method of achieving the objectives planned projects, which means a project with a certain level of performance required in a planned time, with planned costs.

  6. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  7. Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach

    NARCIS (Netherlands)

    Miao, Yongwu; Sloep, Peter; Koper, Rob

    2009-01-01

    Miao, Y., Sloep, P. B., & Koper, R. (2010). Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach. In D. Griffiths & R. Koper (Eds.), Rethinking Learning and Employment at a Time of Economic Uncertainty. Proceedings of the 6th TENCompetence Open

  8. Project management in building industry management

    Directory of Open Access Journals (Sweden)

    Martin Nový

    2012-01-01

    Full Text Available The article deals with contents of the project management on general level first. It mentions the most widespread project management standards, which have historically developed in global scale, their parts and objectives. Further, it describes position of the building industry in national economy, its specific features distinguishing it from the other industrial production, contents of the building industry management and project management of structures. The importance of the role of project manager is documented by characteristics of construction projects, their course, contents of sub-phases, and individual types of managing activities. Attention is devoted to project planning – determination of realization costs, necessary resources, sequence and time course of individual works. The most frequently used graphic methods of schedule presentation – Gantt chart, network chart and frequency bar chart are applied on examples of constructions. These charts can be focused in time sequence on individual types of resources – workforce, finance, materials, energies, and machinery. In conclusion, necessity to manage the project management procedures is emphasized as a part of skills of a construction engineer in the role of preparation manager or construction project realization manager.

  9. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  10. How Project Managers Really Manage: An Indepth Look at Some Managers of Large, Complex NASA Projects

    Science.gov (United States)

    Mulenburg, Gerald M.; Impaeilla, Cliff (Technical Monitor)

    2000-01-01

    This paper reports on a research study by the author that examined ten contemporary National Aeronautics and Space Administration (NASA) complex projects. In-depth interviews with the project managers of these projects provided qualitative data about the inner workings of the project and the methodologies used in establishing and managing the projects. The inclusion of a variety of space, aeronautics, and ground based projects from several different NASA research centers helped to reduce potential bias in the findings toward any one type of project, or technical discipline. The findings address the participants and their individual approaches. The discussion includes possible implications for project managers of other large, complex, projects.

  11. Fundamentals of Project Management

    CERN Document Server

    Heagney, Joseph

    2011-01-01

    With sales of more than 160,000 copies, Fundamentals of Project Management has helped generations of project managers navigate the ins and outs of every aspect of this complex discipline. Using a simple step-by-step approach, the book is the perfect introduction to project management tools, techniques, and concepts. Readers will learn how to: ò Develop a mission statement, vision, goals, and objectives ò Plan the project ò Create the work breakdown structure ò Produce a workable schedule ò Understand earned value analysis ò Manage a project team ò Control and evaluate progress at every stage.

  12. Project Management Communication 2.0

    DEFF Research Database (Denmark)

    Berggreen, Line; Kampf, Constance Elizabeth

    2015-01-01

    How can we understand project management communication practices for developing effective practices in professional and technical communication? In this article we explore an approach to project management that focuses on projects as having a technical documentation structure with content...... that is developed through social or interpersonal communication practices. Looking at the broader picture of project management which besides the implementation phase also includes conception, planning and closure, we see a project management framework that brings together both technical and social aspects...... of project communication. To understand how this works, we interviewed project managers about their understanding and strategy in communicating about the projects they lead. Findings demonstrate that more experienced project managers have a more nuanced understanding of project communication as both...

  13. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  14. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    Science.gov (United States)

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  15. Project management the agile way making it work in the enterprise

    CERN Document Server

    Goodpasture, John C

    2016-01-01

    Widely acclaimed as one of the top Agile books and a recommended resource for the PMI-ACP Exam in its first edition, Project Management the Agile Way by popular demand has been updated and redesigned. This second edition is in modular format to facilitate training and advanced course instruction, and provides new coverage of Agile, such as hybrid agile methods, the latest public sector practices, and a chapter dedicated to transitioning to agile. It discusses the "grand bargain" between project management and business, the shift in dominance from plans to product, and from input to output, and introduces new concepts such as return on benefit. Experienced practitioners and students that want to learn how to make agile work effectively in the enterprise should read this book. Individuals preparing for the PMI Agile Certified Practitioner (PMI-ACP) examination, and training providers developing courses, will find this second edition quite helpful.

  16. Using historical crash data as part of traffic work zone safety planning and project management strategies.

    Science.gov (United States)

    2014-07-01

    This funding enabled the project entitled, USING HISTORICAL CRASH DATA AS PART OF TRAFFIC WORK ZONE SAFETY : PLANNING AND PROJECT MANAGEMENT STRATEGIES to address the following: : Evaluate current organizational strategies with respect to w...

  17. Team work on international projects

    International Nuclear Information System (INIS)

    Hayfield, F.

    1983-01-01

    A successful team will result in Project efficiency and so lead to a better achievement of the Project objectives. Such a team will be self-motivating and have a high level of morale. An effective team will also create a better context for transfer of know-how and so better prepare its members for greater roles on future Project teams. The nature of Project work forces the process of team building to recognize several facts of life. A Project team can have a life as short as one year and as long as ten years. A team usually consists of people on temporary transfer from different departments yet retaining a link of some sort to their departments of origin. It may consist of members of one company only or of several as in a joint-venture and may include Client personnel. On International Projects, the members of a team may have different nationalities and be working in a language foreign to many of them. Many of the Project people may be expatriates to the Project area on a bachelor or on a married status well away from their head or usual office. Team building is a complex organizational and human process, with no mathematical formula for the ideal solution. It starts with the selection of the right Project Manager who should be a leader, a technocrat manager and an integrator all at the same time. The Project Manager must have the authority to create the organizational and human climate that will motivate to a maximum each member of the team. Each member must understand clearly his role and realize that this contribution to the Project will influence his career development. Loyalty to the Project Manager must be possible and the Departmental Manager has to recognize this necessity. This presentation will indicate the basic steps of a team building process on a typical major international Project

  18. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  19. 6 Project-Management Tips

    Science.gov (United States)

    Demski, Jennifer

    2012-01-01

    When it comes to project management, the IT department is typically its own worst enemy. When project requests are pushed through the budgeting process by different departments, it's up to IT to make them all work. The staff is required to be "heroic" to get the project load done. People get to work over weekends and postpone their vacations. The…

  20. Project Management Yinyang: Coupling project success and client satisfaction

    Directory of Open Access Journals (Sweden)

    Greg Stewart Usher

    2017-06-01

    Full Text Available Our research applies paradox theory to a project management construct to help project management researchers and practitioners understand the tensions that can exist between project success and client satisfaction. Our research highlights that although project success and client satisfaction are both present within a project management construct, they also belong to different functional systems. Project success and client satisfaction have different systemic-discourses and use different language games to convey information. These distinctions can create latent and sometimes salient tensions within the project management construct that project managers must understand, embrace, and work with. We have used a Grounded Theory (GT methodology to explore the lived experience of project managers, and from this have identified a phenomenon which we have termed project management yinyang. Project management yinyang is the state that exists when both project success and Client satisfaction are tightly coupled within the project management construct. Project management yinyang highlights that these two phenomena cannot be viewed as separate elements because the ‘seed’ of each exists within the other. And to truly achieve one, you must also achieve the other. Our findings indicate that in order to create project management yinyang the project manager must embrace a paradoxical yet holistic philosophy. They must understand the complementarity, interdependency, and structural coupling that exists between the positivist and interpretivist paradigms within the project management construct. They must understand how satisfaction (Yin and success (Yang are created through focus. Furthermore, they must understand how project management yinyang is separate from, but borne from, the convergence of the other two elements.

  1. Non-Profit/Higher Education Project Management Series: The Project Plan

    Science.gov (United States)

    Burgher, Karl E.; Snyder, Michael

    2012-01-01

    This is the second installment of the AACRAO management series focusing on project management in the academy. In this article, the authors focus on white papers (often called charters, briefs, or fact sheets) and their partner, the work plan. The work plan is a detailed document that defines each aspect of a project. It is often preceded by a…

  2. Project network-oriented materials management policy for complex projects

    DEFF Research Database (Denmark)

    Dixit, Vijaya; Srivastava, Rajiv K; Chaudhuri, Atanu

    2015-01-01

    This work devises a materials management policy integrated with project network characteristics of complex projects. It proposes a relative quantitative measure, overall criticality (OC), for prioritisation of items based on penalty incurred due to their non-availability. In complex projects...... managerial tacit knowledge which provides them enough flexibility to provide information in real form. Computed OC values can be used for items prioritisation and as shortage cost coefficient in inventory models. The revised materials management policy was applied to a shipbuilding project. OC values were......, practicing managers find it difficult to measure OC of items because of the subjective factors and intractable nature of penalties involved. However, using their experience, they can linguistically identify the antecedents and relate them to consequent OC. This work adopts Fuzzy Set Theory to capture...

  3. SharePoint 2010 for Project Management

    CERN Document Server

    Sy, Dux

    2012-01-01

    If you were to analyze your team's performance on a typical project, you'd be surprised how much time is wasted on non-productive tasks. This hands-on guide shows you how to work more efficiently by organizing and managing projects with SharePoint 2010. You'll learn how to build a Project Management Information System (PMIS), customized to your project, that can effectively coordinate communication and collaboration among team members. Written by a certified Project Management Professional (PMP) and Microsoft SharePoint MVP with 15 years of IT project management experience, each chapter incl

  4. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    Full Text Available Modern management theory treats all complex tasks and duties like projects and make these projects possible to be managed by a particular organizational-management concept in order to achieve a goal effectively. A large number of jobs and tasks performed in the system of defense or for defense purposes have the characteristics of projects. Project management is both a skill and a science of monitoring human, material, financial, energy and other resources to achieve required objectives within the given limits: deadlines, time, budget, possibility of realization and the satisfaction of the interests of all project participants. Project management is a traditional area of applied (or functional management focused on managing complex and uncertain situations with defined goals. Introduction In conditions of rapid change and high uncertainty, only adaptive organizations survive, i. e. those that are able not only to react quickly to changes but also to proactively take advantage of changes. Development of project management The biggest influence on the development of the area had complex jobs within the engineering profession. In parallel with the traditional approach new approaches began to develop, while the traditional one still remained in use. Contrary to the traditional engineering approach, a dynamic model first developed in order to respond to demands for greater control of costs. Project management Project management is a skill and knowledge of human and material resources to achieve set objectives within prescribed limits: deadlines, time, budget, possibility of realization, and the satisfaction of all participants in the project. In order to realize a project effectively, it is necessary to manage it rationally. Planning and project management A project plan is a document that allows all team members insight on where to go, when to start and when to arrive, what is necessary to be done in order to achieve the project objectives and what

  5. Constructing new working practices through project narratives

    NARCIS (Netherlands)

    Veenswijk, M.B.; Berendse, M.

    2008-01-01

    In this article we focus on the (internal and external) dynamics of New Public Management (NPM) in the daily life of project management. We concentrate on the ways NPM concepts work out in the realities of project actors. Based on recent research within the Dutch infrastructure sector, we analyse

  6. Risk management in nuclear projects

    International Nuclear Information System (INIS)

    Salles, Claudio J.R.

    2002-01-01

    The risk management will be defined by different aspects: danger or loss possibility, or responsibility for damage. The risk management is one stage of project management. The risk management is a continuous process of planning, identification, quantification, answer and risk control to maximize the success potential of activity. The reduction of risk is part of priority establishment. This work will indicate how introduce this important instrument in the management of nuclear projects. (author)

  7. Reflexive project management in high-abition projects

    NARCIS (Netherlands)

    Loeber, Anne; Vermeulen, T.

    2016-01-01

    Purpose
    The Aristotelian notion of phronèsis inspired innovative work in the realm of project management as well as in literature on sustainability and societal transformations. We argue that both literatures may benefit from a dialogue between the two, especially in view of outlining project

  8. Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach

    OpenAIRE

    Miao, Yongwu; Sloep, Peter; Koper, Rob

    2009-01-01

    Miao, Y., Sloep, P. B., & Koper, R. (2010). Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach. In D. Griffiths & R. Koper (Eds.), Rethinking Learning and Employment at a Time of Economic Uncertainty. Proceedings of the 6th TENCompetence Open workshop (pp. 22-33). November, 19-20, 2009, Manchester, UK. Bolton, UK: Institute for Educational Cybernetics, The University of Bolton. For the complete book please see http://hdl.handle.net/1820/3191

  9. Apply Lean Thinking in Project Management

    OpenAIRE

    Pham Ngoc, Lan

    2015-01-01

    The purpose of this thesis was to study the effects of Lean Thinking in Project Management and how applying Lean Project Management could enhance the productivity of project work. The study was carried using theoretical research and collecting empirical data from three interviews and one case study at a local company. At the end of the study, the major project management problems at the company were identified and analyzed following Lean Principles. It was also pointed out where there...

  10. The WorkQueue project - a task queue for the CMS workload management system

    Science.gov (United States)

    Ryu, S.; Wakefield, S.

    2012-12-01

    We present the development and first experience of a new component (termed WorkQueue) in the CMS workload management system. This component provides a link between a global request system (Request Manager) and agents (WMAgents) which process requests at compute and storage resources (known as sites). These requests typically consist of creation or processing of a data sample (possibly terabytes in size). Unlike the standard concept of a task queue, the WorkQueue does not contain fully resolved work units (known typically as jobs in HEP). This would require the WorkQueue to run computationally heavy algorithms that are better suited to run in the WMAgents. Instead the request specifies an algorithm that the WorkQueue uses to split the request into reasonable size chunks (known as elements). An advantage of performing lazy evaluation of an element is that expanding datasets can be accommodated by having job details resolved as late as possible. The WorkQueue architecture consists of a global WorkQueue which obtains requests from the request system, expands them and forms an element ordering based on the request priority. Each WMAgent contains a local WorkQueue which buffers work close to the agent, this overcomes temporary unavailability of the global WorkQueue and reduces latency for an agent to begin processing. Elements are pulled from the global WorkQueue to the local WorkQueue and into the WMAgent based on the estimate of the amount of work within the element and the resources available to the agent. WorkQueue is based on CouchDB, a document oriented NoSQL database. The WorkQueue uses the features of CouchDB (map/reduce views and bi-directional replication between distributed instances) to provide a scalable distributed system for managing large queues of work. The project described here represents an improvement over the old approach to workload management in CMS which involved individual operators feeding requests into agents. This new approach allows for a

  11. The WorkQueue project - a task queue for the CMS workload management system

    International Nuclear Information System (INIS)

    Ryu, S; Wakefield, S

    2012-01-01

    We present the development and first experience of a new component (termed WorkQueue) in the CMS workload management system. This component provides a link between a global request system (Request Manager) and agents (WMAgents) which process requests at compute and storage resources (known as sites). These requests typically consist of creation or processing of a data sample (possibly terabytes in size). Unlike the standard concept of a task queue, the WorkQueue does not contain fully resolved work units (known typically as jobs in HEP). This would require the WorkQueue to run computationally heavy algorithms that are better suited to run in the WMAgents. Instead the request specifies an algorithm that the WorkQueue uses to split the request into reasonable size chunks (known as elements). An advantage of performing lazy evaluation of an element is that expanding datasets can be accommodated by having job details resolved as late as possible. The WorkQueue architecture consists of a global WorkQueue which obtains requests from the request system, expands them and forms an element ordering based on the request priority. Each WMAgent contains a local WorkQueue which buffers work close to the agent, this overcomes temporary unavailability of the global WorkQueue and reduces latency for an agent to begin processing. Elements are pulled from the global WorkQueue to the local WorkQueue and into the WMAgent based on the estimate of the amount of work within the element and the resources available to the agent. WorkQueue is based on CouchDB, a document oriented NoSQL database. The WorkQueue uses the features of CouchDB (map/reduce views and bi-directional replication between distributed instances) to provide a scalable distributed system for managing large queues of work. The project described here represents an improvement over the old approach to workload management in CMS which involved individual operators feeding requests into agents. This new approach allows for a

  12. The WorkQueue project: A task queue for the CMS workload management system

    Energy Technology Data Exchange (ETDEWEB)

    Ryu, S. [Fermilab; Wakefield, Stuart [Imperial Coll., London

    2012-01-01

    We present the development and first experience of a new component (termed WorkQueue) in the CMS workload management system. This component provides a link between a global request system (Request Manager) and agents (WMAgents) which process requests at compute and storage resources (known as sites). These requests typically consist of creation or processing of a data sample (possibly terabytes in size). Unlike the standard concept of a task queue, the WorkQueue does not contain fully resolved work units (known typically as jobs in HEP). This would require the WorkQueue to run computationally heavy algorithms that are better suited to run in the WMAgents. Instead the request specifies an algorithm that the WorkQueue uses to split the request into reasonable size chunks (known as elements). An advantage of performing lazy evaluation of an element is that expanding datasets can be accommodated by having job details resolved as late as possible. The WorkQueue architecture consists of a global WorkQueue which obtains requests from the request system, expands them and forms an element ordering based on the request priority. Each WMAgent contains a local WorkQueue which buffers work close to the agent, this overcomes temporary unavailability of the global WorkQueue and reduces latency for an agent to begin processing. Elements are pulled from the global WorkQueue to the local WorkQueue and into the WMAgent based on the estimate of the amount of work within the element and the resources available to the agent. WorkQueue is based on CouchDB, a document oriented NoSQL database. The WorkQueue uses the features of CouchDB (map/reduce views and bi-directional replication between distributed instances) to provide a scalable distributed system for managing large queues of work. The project described here represents an improvement over the old approach to workload management in CMS which involved individual operators feeding requests into agents. This new approach allows for a

  13. Project Management

    DEFF Research Database (Denmark)

    Pilkington, Alan; Chai, Kah-Hin; Le, Yang

    2015-01-01

    This paper identifies the true coverage of PM theory through a bibliometric analysis of the International Journal of Project Management from 1996-2012. We identify six persistent research themes: project time management, project risk management, programme management, large-scale project management......, project success/failure and practitioner development. These differ from those presented in review and editorial articles in the literature. In addition, topics missing from the PM BOK: knowledge management project-based organization and project portfolio management have become more popular topics...

  14. Project Management and Total Quality Management : Complementary or confused?

    Directory of Open Access Journals (Sweden)

    Selma KATLANE BEN MLOUKA

    2009-01-01

    Full Text Available Quality management and project management appear as themes of strategic management today. The adoption of the project management constitutes a new way in organizing the production. It helps to cope with the complexity of the environment, to reduce the product life cycles and to make working arrangements more flexible. It should also adapt to the ICT revolution and restructuring of enterprises due to the dematerialisation of structures and transactions. Quality management, applied to more operations and strongly influenced by the quantitative approach seems compatible with project management. Indeed, the two paradigms emphasize the importance of customer satisfaction, teamwork, the role of leadership and the continuous improvement of processes and products. This paper aims to revisit the principles of relationship between total quality management and project management. Having shown the importance of incorporating fine patterns and project quality in business organization, we will explain how the ability to generate, select and conduct projects in an oriented accountability of management is able to enroll in a total quality.

  15. Site quality management of engineering projects

    International Nuclear Information System (INIS)

    Jiang Yiqun

    2008-01-01

    Site quality management of an engineering project of NPIC was introduced in this paper. Requirements on organization and management, interfaces, and management of interior and exterior communication were put forward, by description of quality planning, process management, process monitoring and summarizing for the engineering projects. By the management of personnel, specifications and procedures, and the control of equipment, material and work surroundings, not only the safety is ensured, but also the quality and schedule of the engineering project were guaranteed, and so the expected quality goals were achieved. (author)

  16. Project Work Management Addressing the Needs of BVI Learners of EFL

    Directory of Open Access Journals (Sweden)

    Tatiana S. Makarova

    2017-12-01

    Full Text Available Introduction: it is known that inclusive education that opens access to education and facilitates students with special educational needs to socialize successfully is concentrated in special schools whilst mainstream teachers generally lack the methodology of teaching disabled students inclusively. The aim of the article is searching the best ways of educating students with special needs and providing specific conditions of the educational process in mainstream schools. Materials and Methods: the research is based on the results of fulfillment of a number of projects that deal with teaching and educating blind and visually impaired learners and in which all the authors of the article were involved. The problematic approach, the logical method and observation were applied to the research; analysis, comparison, generalization being the most important components of the study. The quantitative data were collected, analyzed and resumed as well. Results: the impact of project work implementation on academic and social skills development of blind and visually impaired students is shown and various types of projects that can be made by visually impaired learners are presented. The authors give their comments when analyzing different ways of adapting research activities to the needs of BVI learners. When speaking in detail on the role of web tools as maximizers of students’ potential the authors refer to their own experience in implementing web tools in project work with blind and visually impaired learners. Discussion and Conclusions: university teacher-training programs should be revised and improved by offering additional courses aimed at educating impaired students through doing research or project work. Special attention should be paid to developing the instructors’ project management skills in terms of teaching English as a foreign language to learners with special needs. It should be noted that different methods and various technological tools

  17. Scrum Project Management

    CERN Document Server

    Pries, Kim H

    2010-01-01

    Scrum, which was originally invented solely for software development, can now be applied to all types of projects. This book shows project managers how to implement Scrum by explaining the artifacts, rituals, and roles used. The text provides Scrum planning methods to control project scope and schedule as well as Scrum tracking methods to focus teams on improving throughput and streamlining communications. The authors show how to combine traditional project methods with Scrum and how to adapt the familiar work breakdown structure to create Scrum backlogs and sprints. They also demonstrate how

  18. Project management in libraries, archives and museums working with government and other external partners

    CERN Document Server

    Carpenter, Julie

    2010-01-01

    Aimed at practitioners and managers, this practical handbook provides a source of guidance on project management techniques for the academic and cultural heritage sectors, focusing on managing projects involving public sector and other external partners. Issues under consideration and illustration include: different approaches to managing projects and how to select appropriate methods; using project management tools and other applications in project development and implementation; ensuring the sustainability of project outcomes and transferability into practice; realistic monitoring methodolog

  19. Draft project management update to the Iowa DOT Project Development Manual : final report.

    Science.gov (United States)

    2016-08-01

    This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to : incorporate a greater focus on project management in their project development process. : A technical advisory committee (TAC) ...

  20. Competency model for the project managers of technical projects

    Science.gov (United States)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  1. When Serious Project Management is a Critical Business Requirement

    Science.gov (United States)

    Jansma, P. A.; Gibby, L.; Chambers, C.; Joines, J.; Egger, R.

    2000-01-01

    When serious project management is a critical business requirement, project managers need to integrate cost, schedule and technical scope of work across the project, and apply earned value management (EVM).

  2. ORGANIZATIONAL PROJECT MANAGEMENT MATURITY

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2017-11-01

    Full Text Available The present article is aimed at developing a set of recommendations for achieving a higher level of organizational project maturity at a given enterprise. Methodology. For the purposes of the current research, the available information sources on the components of project management system are analysed; the essence of “organizational maturity” and the existing models of organizational maturity are studied. The method of systemic and structural analysis, as well as the method of logical generalization, are employed in order to study the existing models of organizational maturity, to describe levels of organizational maturity, and finally to develop a set of methodological recommendations for achieving a higher level of organizational project maturity at a given enterprise. The results of the research showed that the core elements of project management system are methodological, organizational, programtechnical, and motivational components. Project management encompasses a wide range of issues connected with organizational structure, project team, communication management, project participants, etc. However, the fundamental basis for developing project management concept within a given enterprise starts with defining its level of organizational maturity. The present paper describes various models of organizational maturity (staged, continuous, petal-shaped and their common types (H. Кеrzner Organizational Maturity Model, Berkeley PM Maturity Model, Organizational Project Management Maturity Model, Portfolio, Program & Project Management Maturity Model. The analysis of available theoretic works showed that the notion “organizational project maturity” refers to the capability of an enterprise to select projects and manage them with the intention of achieving its strategic goals in the most effective way. Importantly, the level of maturity can be improved by means of formalizing the acquired knowledge, regulating project-related activities

  3. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  4. Document Management Projects: implementation guide

    Directory of Open Access Journals (Sweden)

    Beatriz Bagoin Guimarães

    2016-12-01

    Full Text Available Records Management System implementation is a complex process that needs to be executed by a multidisciplinary team and involves components of apparently non-related areas such as archival science, computer engineering, law, project management and human resource management. All of them are crucial and complementary to guarantee a full and functional implementation of a system and a perfect fusion with the connected processes and procedures. The purpose of this work is to provide organizations with a basic guide to Records Management Project implementation beginning with the steps prior to acquiring the system, following with the main project activities and concluding with the post implementation procedures of continuous improvement and system maintenance.

  5. Integrated project management type contracts

    International Nuclear Information System (INIS)

    Heisler, S.I.

    1975-01-01

    The concept of integrated project management represents a single source to which the owner can turn for all project management functions excepting for those relating to outside parties such as site purchase, personnel selection etc. Other functions such as design, procurement, construction management, schedule and cost control, quality assurance/quality control are usually handled by the integrated project manager as the agent of the owner. The arrangement is flexible and the responsibilities can be varied to suit the size and experience of the owner. Past experience in the United States indicates an increase in the trend toward IPM work and it appears that overseas this trend is developing also. (orig./RW) [de

  6. Managing Complex Distance Education Projects in a Telework Environment

    Science.gov (United States)

    Ally, Mohamed; Cleveland-Innes, Marti; Wiseman, Colin

    2010-01-01

    The advances of communication technologies have allowed professionals to work on distance education projects in a telework environment. Managers of these projects must have the skills to manage the projects from a distance. They must be able to select the appropriate team members to work on the project, orient team members, and monitor team…

  7. Waste Management Process Improvement Project

    International Nuclear Information System (INIS)

    Atwood, J.; Borden, G.; Rangel, G. R.

    2002-01-01

    The Bechtel Hanford-led Environmental Restoration Contractor team's Waste Management Process Improvement Project is working diligently with the U.S. Department of Energy's (DOE) Richland Operations Office to improve the waste management process to meet DOE's need for an efficient, cost-effective program for the management of dangerous, low-level and mixed-low-level waste. Additionally the program must meet all applicable regulatory requirements. The need for improvement was highlighted when a change in the Groundwater/Vadose Zone Integration Project's waste management practices resulted in a larger amount of waste being generated than the waste management organization had been set up to handle

  8. Methodologies used in Project Management

    OpenAIRE

    UNGUREANU, Adrian; UNGUREANU, Anca

    2014-01-01

    Undoubtedly, a methodology properly defined and strictly followed for project management provides a firm guarantee that the work will be done on time, in budget and according to specifications. A project management methodology in simple terms is a “must-have” to avoid failure and reduce risks, because is one of the critical success factors, such basic skills of the management team. This is the simple way to guide the team through the design and execution phases, processes and tasks throughout...

  9. Agile & Distributed Project Management

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Pries-Heje, Lene

    2011-01-01

    Scrum has gained surprising momentum as an agile IS project management approach. An obvious question is why Scrum is so useful? To answer that question we carried out a longitudinal study of a distributed project using Scrum. We analyzed the data using coding and categorisation and three carefully...... selected theoretical frameworks. Our conclusion in this paper is that Scrum is so useful because it provides effective communication in the form of boundary objects and boundary spanners, it provides effective social integration by building up social team capital, and it provides much needed control...... and coordination mechanisms by allowing both local and global articulation of work in the project. That is why Scrum is especially useful for distributed IS project management and teamwork....

  10. Project management a systems approach to planning, scheduling, and controlling

    CERN Document Server

    Kerzner, Harold

    2017-01-01

    Project Management is the bestselling text for students and professionals, presenting a streamlined approach to project management functions in full alignment with PMI(r)'s latest Project Management Body of Knowledge (PMBOK(r)). This new 12th edition has been updated to reflect the latest changes found in the PMBOK(r) Guide--Sixth Edition, and features new coverage of emerging topics including global stakeholder management, causes of failure, agile project management, project governance failure, customer approval milestones, classifying project metrics, and more. Supplementary materials are available for students, working professionals, and instructors. * Understand organizational structures and project management functions * Learn how to control costs, manage risk, and analyze trade-offs * Examine different methods used for planning, scheduling, QA, and more * Work effectively with customers and stakeholders from around the globe Project Management is the comprehensive reference to keep within arm's reach. ...

  11. Risk management in public sector construction projects: Case ...

    African Journals Online (AJOL)

    a project environment. Since projects are complicated, experience ... work, delays trigger cost overruns in construction projects (African. Development Bank ..... quantity surveying, contract management, and engineering. Table 4: Research ..... professionals at the business and operational levels of construction management.

  12. Successful healthcare programs and projects: organization portfolio management essentials.

    Science.gov (United States)

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.

  13. The interdisciplinary nature of the skills needed by project managers

    Directory of Open Access Journals (Sweden)

    Trevor Nesbit

    Full Text Available The purpose of this paper is to explore and analyse the additional skills that are transferrable across different sectors, that project managers require and that go beyond technical project management skills to enable them to be successful in what is becoming an increasingly interdisciplinary role.The conclusions highlight that the project management role requires a range of non- technical project management skills and characteristics to enable project management to be carried out successfully. These non- technical project management skills and characteristics include the ability to build relationships with stakeholders; possessing formal project management certification; understanding the creation and functioning of project teams; understanding the political environment that the project exists in; the ability to work in a team; possessing leadership and management skills; possessing interpersonal and communication skills and possessing a strategic orientation.The skills and characteristics that are perceived by the cross section of project managers as being the most important are possessing interpersonal and communication skills; possessing leadership and management skills; the ability to work in a team and the ability to build relationships with stakeholders. Interpersonal and communication skills along with the ability to work in a team are not included significantly in job advertisements for project managers, with the requirement to have them potentially being assumed and not needed to be stated.This research provides a basis for a further study involving in-depth interviews with project managers from the information technology sector with the aim of highlighting specific projects where these additional skills have been vital to the success of these projects.Issues surrounding the political environment of the project from the perspective of different genders; the importance interpersonal and communication skills along with team work for

  14. Project Management

    DEFF Research Database (Denmark)

    Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015.......Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015....

  15. MANAGE INTERESTED PARTIES IN PROJECT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    BILOKON A. I.

    2016-04-01

    Full Text Available The success or failure of the project often depends on factors which related to the environment, surrounded by the project and which are outside of the direct control of the project manager. The concept of the project environment, the processes of environmental analysis of the project and the ways in which managers can identify potential problems and develop a plan of action to ensure the success of the project. The management strategy the main factors of the environment includes both organizational forms and measures which aimed at the development process. For alignment of the organizational forms of communication manager must have a clear idea: what kind of interested persons and their actions (functions need to monitor, and in what form to maintain communication (bilateral relations of interdependence. This information is key to the further construction of the formal organization that supports interaction, the definition of its functions, competencies, allocation of roles, areas of responsibility, instructions, forms and methods of work. Purpose. Summarize, analyze and form an idea of the potential of existing approaches to the management of the project environment. Object of study. Management processes of the persons, who interested in the project environment. Subject of study. Methods and tools for the project management environment.

  16. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Tamara Gvozdenovic

    2008-03-01

    Full Text Available One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviations from the previously set quality standards. Basic processes of project quality management are: quality planning, quality assurance and quality control.

  17. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    OpenAIRE

    Tamara Gvozdenovic; Mirjana Miljanovic; Aleksandar Jegdic; Zeljko Crnogorcic

    2008-01-01

    One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviatio...

  18. Online Project Management for Dynamic e-Collaboration

    Directory of Open Access Journals (Sweden)

    Lucia RUSU

    2010-01-01

    Full Text Available Today's collaborative projects demand efficient and productive software application tools for the workplace that will bring remote teams together to get the work done. Dynamic e-collaboration is a necessity for virtual relations and business agreements. It depends on two distinct factors: trust and need. This paper presents a way to manage remote teams using a web application developed with ColMap model of project management in an IT company. The information exposed and shared applications with partners in collaborative projects are based on RBAC. Group collaboration and management software has been proven to successfully manage and coordinate projects.

  19. Siberian Chemical Combine laboratory project work plan, fiscal year 1999

    International Nuclear Information System (INIS)

    Morgado, R.E.; Acobyan, R.; Shropsire, R.

    1998-01-01

    The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites' input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves

  20. Management evolution in the LSST project

    Science.gov (United States)

    Sweeney, Donald; Claver, Charles; Jacoby, Suzanne; Kantor, Jeffrey; Krabbendam, Victor; Kurita, Nadine

    2010-07-01

    The Large Synoptic Survey Telescope (LSST) project has evolved from just a few staff members in 2003 to about 100 in 2010; the affiliation of four founding institutions has grown to 32 universities, government laboratories, and industry. The public private collaboration aims to complete the estimated $450 M observatory in the 2017 timeframe. During the design phase of the project from 2003 to the present the management structure has been remarkably stable. At the same time, the funding levels, staffing levels and scientific community participation have grown dramatically. The LSSTC has introduced project controls and tools required to manage the LSST's complex funding model, technical structure and distributed work force. Project controls have been configured to comply with the requirements of federal funding agencies. Some of these tools for risk management, configuration control and resource-loaded schedule have been effective and others have not. Technical tasks associated with building the LSST are distributed into three subsystems: Telescope & Site, Camera, and Data Management. Each sub-system has its own experienced Project Manager and System Scientist. Delegation of authority is enabling and effective; it encourages a strong sense of ownership within the project. At the project level, subsystem management follows the principle that there is one Board of Directors, Director, and Project Manager who have overall authority.

  1. AFSC Laboratory Management Information Requirements Project

    National Research Council Canada - National Science Library

    1982-01-01

    This document was developed under the auspices of the Laboratory IRM (LIRM) Management Working Group in response to AFSC Program Directive 0008-81-1, Management Information Requirement Project (23 February 1981...

  2. How Do Managers Control Technology-Intensive Work?

    Directory of Open Access Journals (Sweden)

    Angelo Bernard Pinheiro

    2010-08-01

    Full Text Available Technology pervades every aspect of the modern business enterprise and demands new strategies for work management. Advances in internet and computing technologies, the emergence of the “knowledge worker”, globalization, resource scarcity, and intense competition have led corporations to accomplish their strategic goals and objectives through the implementation of projects. Project success is assured by the effective use of financial and human resources, a project management (PM framework backed by senior management, and controls spanning the PM spectrum of initiation; planning; implementation; monitoring, measurement, and control; and closing. As an essential function of management, ‘control’ may be accomplished through a PM Plan, a project-matrix organization, competent and motivated people, and appropriate management tools and techniques. A PM Plan conforming to the Project Management Body of Knowledge (PMBOK framework incorporates controls for the key PM elements and, implemented properly, can assure project success

  3. Oil sands tailings management project

    Energy Technology Data Exchange (ETDEWEB)

    Godwalt, C. [Alberta WaterSMART, Calgary, AB (Canada); Kotecha, P. [Suncor Energy Inc, Calgary, AB (Canada); Aumann, C. [Alberta Innovates - Technology Futures, Alberta Governement, AB (Canada)

    2010-11-15

    The Oil sands leadership initiative (OSLI) works with the Government of Alberta on the development of the oil sands industry, considering environmental, economical and social aspects. Water management was identified as one of most important areas to focus on. Alberta WaterSMART was requested to support the development and the management of projects resulting from the work done or underway in this field. The development of a regional water management solution stood out as the most interesting solution to obtain significant results. In the Athabasca Region, oil sands producers work independently on their water sourcing and disposal with particular attention to fresh water conservation and economics. The Athabasca River represents a source for mines and distant saline aquifers are the target of steam assisted gravity drainage (SAGD) operators. As part of a four-phase project aiming to study the environmental and economic footprint (EEF) benefit of alternatives for Athabasca oil sands production water supply and disposal, the purpose of the tailings water management project was to identify tailings treatment technologies that are ready to be implemented, and to design and evaluate solutions in order to improve regional oil sands production water sourcing and disposal. Alternatives were evaluated based on their total EEF, applying a lifecycle assessment methodology with a particular attention on the quantification of important performance indicators. 25 refs., 8 tabs., 40 figs.

  4. Oil sands tailings management project

    International Nuclear Information System (INIS)

    Godwalt, C.; Kotecha, P.; Aumann, C.

    2010-11-01

    The Oil sands leadership initiative (OSLI) works with the Government of Alberta on the development of the oil sands industry, considering environmental, economical and social aspects. Water management was identified as one of most important areas to focus on. Alberta WaterSMART was requested to support the development and the management of projects resulting from the work done or underway in this field. The development of a regional water management solution stood out as the most interesting solution to obtain significant results. In the Athabasca Region, oil sands producers work independently on their water sourcing and disposal with particular attention to fresh water conservation and economics. The Athabasca River represents a source for mines and distant saline aquifers are the target of steam assisted gravity drainage (SAGD) operators. As part of a four-phase project aiming to study the environmental and economic footprint (EEF) benefit of alternatives for Athabasca oil sands production water supply and disposal, the purpose of the tailings water management project was to identify tailings treatment technologies that are ready to be implemented, and to design and evaluate solutions in order to improve regional oil sands production water sourcing and disposal. Alternatives were evaluated based on their total EEF, applying a lifecycle assessment methodology with a particular attention on the quantification of important performance indicators. 25 refs., 8 tabs., 40 figs.

  5. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  6. Reflexive project management in high-ambition projects : Exploring the competencies for managing innovative sustainable designs

    NARCIS (Netherlands)

    Loeber, A.; Vermeulen, T.

    2016-01-01

    Purpose The Aristotelian notion of phronèsis inspired innovative work in the realm of project management as well as in literature on sustainability and societal transformations. We argue that both literatures may benefit from a dialogue between the two, especially in view of outlining project

  7. Project Management and the Project Manager: A Strategy for ...

    African Journals Online (AJOL)

    International Journal of Development and Management Review ... collapse, project failure, project abandonment, project cost and time overruns, etc. ... component parts that constitute project management in the building construction industry.

  8. Information systems project management: methods, tools, and techniques

    OpenAIRE

    Mcmanus, John; Wood-Harper, Trevor

    2004-01-01

    Information Systems Project Management offers a clear and logical exposition of how to plan, organise and monitor projects effectively in order to deliver quality information systems within time, to budget and quality. This new book by John McManus and Trevor Wood-Harper is suitable for upper level undergraduates and postgraduates studying project management and Information Systems. Practising managers will also find it to be a valuable tool in their work. Managing information systems pro...

  9. Alternative techniques for environmental project management

    International Nuclear Information System (INIS)

    Reeves, S.

    1994-01-01

    Beginning in the late 1970s and early 1980s, increased regulation and recognition of ground water as an important natural resource led industry to address subsurface contamination at many sites. This caused the industry's dependence on environmental consultants to increase drastically. Initially, the accepted practice for addressing environmental concerns was to rely upon consultants to determine appropriate work scope, budgets, procedures and regulatory interaction. While significant advances have been made in technology and consulting services, improvement in project management and cost containment have been limited. In order to effectively manage environmental projects, it is imperative that business risks and standardized project management practices be factored into environmental solutions. A standardized environmental project management program was developed and applied to projects at petroleum marketing facilities throughout the United States. Following development and implementation, detailed studies were conducted to measure the value of standardization in reducing costs and enhancing efficiencies. The results indicate significant improvement in both reducing project costs and in enhancing the efficiency of consultants

  10. Organization of project management

    International Nuclear Information System (INIS)

    Schmidt, R.

    1975-01-01

    When speaking about interfaces within a project and their management, one has to understand and define what an interface is. In general, each component facing another one and each person working on a project with another person represents an interface. Therefore a project will consist practically in its entirety of interfaces with components and people sandwiched between them. This paper is limited to the most important interfaces with a focus on the problems occuring at them and their resolution. (orig.) [de

  11. Measures to improve nuclear power project management

    International Nuclear Information System (INIS)

    Ma Xinchao

    2012-01-01

    Focusing on correct application of ability level principle in setting organizational structure, the effective management system has been established, and 8 practical management regimes have been developed. Personnel training and management work shall be well done and enhanced. Experience feedback in construction management shall be well done for all systems. Exchange of construction and management techniques shall be actively carried out. All staff shall participate in safety management. KPI system is adopted for assessing stakeholders' project management method, and PDCA cycle is adopted for continued improved. Management level upgrading measures are proposed to ensure the smooth construction of nuclear power project. Setting forth and popularizing management theory can provide reference for and promote the smooth progress of various nuclear power projects. (author)

  12. Groundwater/Vadose Zone Integration Project Management Plan

    International Nuclear Information System (INIS)

    Hughes, M. C.

    1999-01-01

    This Project Management Plan (PMP) defines the authorities, roles, and responsibilities of the US Department of Energy (DOE), Richland Operations Office (RL) and those contractor organizations participating in the Hanford Site' s Groundwater/Vadose Zone (GW/VZ) Integration Project. The PMP also describes the planning and control systems, business processes, and other management tools needed to properly and consistently conduct the Integration Project scope of work

  13. IS-ENES project management - lessons learnt

    Science.gov (United States)

    Parinet, Marie; Guglielmo, Francesca; Joussaume, Sylvie

    2017-04-01

    IS-ENES is the distributed e-infrastructure of models, model data and metadata of the European Network for Earth System Modelling (ENES). It has benefitted from two EC FP7 grants and aims towards further European and national funding to achieve sustainability. We highlight here several challenges related to project management that have risen in the course of these two project-phases spanning 8 years. Some challenges are related to the heterogeneity of the activities within IS-ENES, with different groups working on very diverse activities, not necessarily strictly interdependent. An immediate consequence is the need of implementing and setting up in early phases of the project efficient collection and circulation of information to preserve and reinforce the systemic view of the infrastructure as a whole and the pursuit of common goals, including coordinated provision of services. Toward and beyond such common goals, managing IS-ENES, covering both scientific and more strictly management-related aspects, implies a double-paced approach: besides setting up efficient project workflow, there is the need of setting up longer term objectives. This implies, within the project lifetime, to elaborate and implement a coherent organizational (consistent with scientific goals, funding schemes, research and technology landscape) strategy to pursue these goals beyond the project itself. Furthermore, a series of more generic project management challenges will also be listed and can be gathered around 3 main objectives: ease the internal processes in order to optimize the work, anticipate delays and budget issues, and motivate the project teams by ensuring an efficient internal and external communication.

  14. Project Management in the Finnish Music Industry

    OpenAIRE

    Hypén, Joel

    2009-01-01

    The term project is a widely used phrase in today’s working life. This thesis explains what project management theory is, how it has evolved through history and how it is applied in managing modern business projects in the contexts of the Finnish music business sector. The literature review contains a description of the key phases a project is typically organised in as well as the terms and tools used to plan and run a successful project. Through qualitative research means the thesis inves...

  15. How Do Managers Control Technology-Intensive Work?

    OpenAIRE

    Angelo Bernard Pinheiro

    2010-01-01

    Technology pervades every aspect of the modern business enterprise and demands new strategies for work management. Advances in internet and computing technologies, the emergence of the “knowledge worker”, globalization, resource scarcity, and intense competition have led corporations to accomplish their strategic goals and objectives through the implementation of projects. Project success is assured by the effective use of financial and human resources, a project management (PM) framework bac...

  16. Team- and project work in engineering practices

    DEFF Research Database (Denmark)

    Buch, Anders; Andersen, Vibeke

    2015-01-01

    in teamwork practices, and, thirdly, how team- and project work affect engineering professionalism and collaborative work practices. A practice theoretical framework informs the analysis. Teamwork is investigated as a phenomenon enacted through the sayings, doings and relatings of practitioners in landscapes......In this paper we investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals. The paper investigates how professional engineering practices are enacted in two engineering...... consultancy companies in Denmark where teamwork has been or is an ideal for organizing work. Through a practice-based lens the article sets out to investigate, firstly, how discourses about teamand project work affect engineering work practices, secondly, how technology-mediated management is reconciled...

  17. An Operational ’Project Management Culture’ Framework (Part 1

    Directory of Open Access Journals (Sweden)

    Yvonne du Plessis

    2006-11-01

    Full Text Available The aim of this research is to develop an operational ‘project management culture’ framework, which can be used by project managers and organisations to support project work. One of the main causes of project failure is attributed to a non-supportive project management culture in organisations. A triangulation method is followed inclusive of a thorough literature review, a survey questionnaire and a concept mapping process. A project management culture framework with descriptive elements, based on Deal and Kennedy’s (1982 definition of organisational culture, comprising of four dimensions i.e. project process; people in projects; project systems and structure, and project environment was developed.

  18. Factors of human capital related to project success in health care work units.

    Science.gov (United States)

    Suhonen, Marjo; Paasivaara, Leena

    2011-03-01

    To explore factors of human capital related to project success that employees expect from nurse managers. Human capital refers to those resources that managers working with projects possess, such as abilities, knowledge and qualities of character. The data were collected by open interviews (n=14) with nurses, public health nurses and nurse managers working in primary health care and a hospital. Data analysis was carried out using qualitative content analysis. The main factors of human capital related to project success proved to be as follows: (1) management of enthusiastic project culture, (2) management of regeneration and (3) management of emotional intelligence. Future research is needed on the kind of means nurse managers use in human capital management in projects and how they see their possibilities in managing human capital. Human capital management skills should be underlined as an important competence area when recruiting a nurse manager. The success of health care projects cannot be improved only through education or by training of nurse managers; in addition, projects need nurse managers who understand workplace spirituality and have high emotional intelligence. © 2011 The Authors. Journal compilation © 2011 Blackwell Publishing Ltd.

  19. Leadership and Human Resource Management in Project Circumstances

    OpenAIRE

    Fadjar, Adnan

    2008-01-01

    Leadership is a very important issue in any organizations. The complexity of a project makes the role of the project manager as the leader even more challenging because he/she has to work in an organization which has relatively short time period and dealing with many people who come from various backgrounds. This paper discusses various theories of leadership and proposes their application in project circumstances. As It is often said that the project management is effective if it can manage ...

  20. Decommissioning Project Manager's Implementing Instructions (PMII)

    International Nuclear Information System (INIS)

    Mihalic, M.A.

    1998-02-01

    Decommissioning Project personnel are responsible for complying with these PMII. If at any time in the performance of their duties a conflict between these instructions and other written or verbal direction is recognized or perceived, the supervisor or worker shall place his/her work place in a safe condition, stop work, and seek resolution of the conflict from the Decommissioning Project Manager or his designee

  1. Modern project-management

    CERN Multimedia

    CERN. Geneva

    2003-01-01

    This lecture will focus on the following issues: - The current state of the art in Project Management, especially the integration of Project Management with general management activities, and the integrated view of resources allocation. - Overview of the project life cycle, the phases and the deliverables - Necessity and limits of planning in a research environment - Organizational aspects of the projects the roles of the stakeholders - How to get the resources when they are needed - Risk Management in Projects - Earned value - How to keep a project on track (schedule and budget) - Management of the suppliers - Closing of the project

  2. Integrating knowledge for managing risk in infrastructure projects : the case of tunnel works

    NARCIS (Netherlands)

    Chivatá Cárdenas, Ibsen

    2012-01-01

    The objective of traditional approaches to project risk management is to identify risks that can lead to project failure and to implement effective strategies to manage them. Information on the relevant causes and conditions in which failures arise is usually required as necessary input for

  3. Project Risk Management

    Science.gov (United States)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  4. On Best Practices for Risk Management in Complex Projects

    Directory of Open Access Journals (Sweden)

    Dan BENTA

    2011-01-01

    Full Text Available Risk management shall be proactive. This is one of the key preliminaries to cope with the challenges of complex projects. An overarching and consistent view on project risks and uncertainties is necessary to follow a holistic approach in project risk management. Uncertainty is inevitable since projects are unique and temporary undertakings based on assumptions and constraints, delivering project results to multiple stakeholders with different requirements. Project management can be seen as an attempt to control this uncertain environment, through the use of structured and disciplined techniques such as estimating, planning, cost control, task allocation, earned value analysis, monitoring, and review meetings. Each of these elements of project management has a role in defining or controlling inherent variability in projects. Project risk management provides approaches by which uncertainty can be understood, assessed, and managed within projects. A number of associations (e.g., Project Management Institute – PMI®, International Project Management Association – IPMA,or Network of Nordic Project Management Associations - NORDNET work constantly in acquiring, improving, and standardizing best practices in project management.Based on the industrial practice, this paper outlines strategies to identify, prioritize, and mitigate risks for achievement of project’ or organizational objectives.

  5. Project Management Plan for Material Stabilization

    International Nuclear Information System (INIS)

    SPEER, D.R.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617/Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides

  6. Project management for small business: a streamlined approach from planning to completion

    National Research Council Canada - National Science Library

    Phillips, Joseph

    2012-01-01

    ... a Project Management Plan 81 72 Developing the Work Breakdown Structure 85 76 Selecting Your Project Management Software 83 65 CHAPTER 4: MANAGING PROJECT COSTS Building a Cost Management Frame...

  7. Adapt! – Agile Project Management Supported by Axiomatic Design

    Directory of Open Access Journals (Sweden)

    Weber Jakob

    2017-01-01

    Full Text Available This paper presents a novel approach for the use of Axiomatic Design Theory in combination with agile project management methods like Scrum for an effective, structured and combined product design and development process. Agile project management methods give a guideline how to manage a project, but there is only minor assistance regarding the actual product development process itself. Axiomatic Design can be used to support these methods in this point. In concrete terms, the results of the decomposition process of this theory can be used to formulate and structure the work packages for the agile project managing process. The Independence Axiom of Axiomatic Design Theory has a substantial contribution by ensuring the independence of the work packages which can be assigned to different project team members and can be processed independently by them. The combination of the different methods not only helps to ensure a good design solution but also helps to work more agile within a project team. The here proposed approach is one part of a holistic product design and development process for changeable production units – called Adapt! – and is described within a use case in the automotive sector.

  8. Management of delayed nuclear power plant projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-09-01

    According to the available information at the IAEA PRIS (Power Reactor Information System) at the end of 1998 there were more than 40 nuclear power plant projects with delays of five or more years with respect to the originally scheduled commercial operation. The degree of conformance with original construction schedules showed large variations due to several issues, including financial, economic and public opinion factors. Taking into account the number of projects with several years delay in their original schedules, it was considered useful to identify the subject areas where exchange of experience among Member States would be mutually beneficial in identification of problems and development of guidance for successful management of the completion of these delayed projects. A joint programme of the IAEA Departments of Nuclear Energy (Nuclear Power Engineering Section) and Technical Co-operation (Europe Section, with additional support from the Latin America and West Asia Sections) was set up during the period 1997-1998. The specific aim of the programme was to provide assistance in the management of delayed nuclear power plants regarding measures to maintain readiness for resuming the project implementation schedule when the conditions permit. The integration of IAEA interdepartmental resources enabled the participation of 53 experts from 14 Member States resulting in a wider exchange of experience and dissemination of guidance. Under the framework of the joint programme, senior managers directly responsible for delayed nuclear power plant projects identified several issues or problem areas that needed to be addressed and guidance on management be provided. A work plan for the development of several working documents, addressing the different issues, was established. Subsequently these documents were merged into a single one to produce the present publication. This publication provides information and practical examples on necessary management actions to preserve

  9. Management of delayed nuclear power plant projects

    International Nuclear Information System (INIS)

    1999-09-01

    According to the available information at the IAEA PRIS (Power Reactor Information System) at the end of 1998 there were more than 40 nuclear power plant projects with delays of five or more years with respect to the originally scheduled commercial operation. The degree of conformance with original construction schedules showed large variations due to several issues, including financial, economic and public opinion factors. Taking into account the number of projects with several years delay in their original schedules, it was considered useful to identify the subject areas where exchange of experience among Member States would be mutually beneficial in identification of problems and development of guidance for successful management of the completion of these delayed projects. A joint programme of the IAEA Departments of Nuclear Energy (Nuclear Power Engineering Section) and Technical Co-operation (Europe Section, with additional support from the Latin America and West Asia Sections) was set up during the period 1997-1998. The specific aim of the programme was to provide assistance in the management of delayed nuclear power plants regarding measures to maintain readiness for resuming the project implementation schedule when the conditions permit. The integration of IAEA interdepartmental resources enabled the participation of 53 experts from 14 Member States resulting in a wider exchange of experience and dissemination of guidance. Under the framework of the joint programme, senior managers directly responsible for delayed nuclear power plant projects identified several issues or problem areas that needed to be addressed and guidance on management be provided. A work plan for the development of several working documents, addressing the different issues, was established. Subsequently these documents were merged into a single one to produce the present publication. This publication provides information and practical examples on necessary management actions to preserve

  10. Project Management Practices as a Subject of Research for CSCW

    DEFF Research Database (Denmark)

    Bossen, Claus; Leimbach, Timo

    2017-01-01

    The ‘project’ is a prevalent form for organising endeavours of construction, innovation, IT development and organisational change. ‘Projects’ involve coordination and cooperation between colocated and distributed actors, and are relevant for CSCW (computer supported cooperative work) research...... as a particular kind of cooperative work. A survey of CSCW publications only identified 26 papers that explicitly address project management (PM), of which most primarily focus on IT development. We argue that CSCW’s conceptual and methodological tools can make significant contributions to PM research, practice...... on computational support for project work and management. In all, we argue that CSCW can advance our understanding of project work and management and the design of adequate computational support....

  11. Management & Communication: Project Management Case Study

    CERN Multimedia

    Nathalie Dumeaux

    2004-01-01

    We are pleased to announce the recent launch of a new workshop on Project Management. This is designed for People with budgetary, scheduling and/or organizational responsibilities in a project or a sub-project. The objectives through a management case study specially suited to CERN are: to become familiar with modern management techniques in use for structuring, planning, scheduling, costing and progress monitoring of a project or a sub-project. to understand in-depth issues associated with Deliverable-oriented Project Management, Earned Value Management, Advanced Project Cost Engineering and Project Risk Management. The full description of this workshop can be found here. The next session will be held on 8 October 2004. If you are interested in this workshop, please contact Nathalie Dumeaux, email or 78144. Programme of Seminars October to December 2004 Situation : 21.09.2004 Séminaires bilingues Dates Jours Places disponibles Project Management Case study 8 October 1 oui Intr...

  12. Management of Teacher Scientific-Methodical Work in Vocational Educational Institutions on the Basis of Project-Target Approach

    Science.gov (United States)

    Shakuto, Elena A.; Dorozhkin, Evgenij M.; Kozlova, Anastasia A.

    2016-01-01

    The relevance of the subject under analysis is determined by the lack of theoretical development of the problem of management of teacher scientific-methodical work in vocational educational institutions based upon innovative approaches in the framework of project paradigm. The purpose of the article is to develop and test a science-based…

  13. Document Management Projects: implementation guide

    OpenAIRE

    Beatriz Bagoin Guimarães

    2016-01-01

    Records Management System implementation is a complex process that needs to be executed by a multidisciplinary team and involves components of apparently non-related areas such as archival science, computer engineering, law, project management and human resource management. All of them are crucial and complementary to guarantee a full and functional implementation of a system and a perfect fusion with the connected processes and procedures. The purpose of this work is to provide organizations...

  14. Client's Constraining Factors to Construction Project Management

    African Journals Online (AJOL)

    factors as a significant system that constrains project management success of public and ... finance for the project and prompt payment for work executed; clients .... consideration of the loading patterns of these variables, the major factor is ...

  15. What You Need to Know about Project Management

    CERN Document Server

    O'Connell, Fergus

    2012-01-01

    What You Need to Know About Project Management Project Management is all about getting things done without spending too much or taking too long. But when you start hearing things like man-days, PSOs and stakeholders, it just makes it difficult to understand. So what do you really need to know about project management? Find out:Why setting clear goals mattersHow to estimate absolutely everything.How to get things back on track after they've gone wrongHow to track big projectsWhy work/life balance matters when you're running a big project This clear and simple approach will mean you'll never pan

  16. Status of Pantex Plant Waste Management Project/program control system

    International Nuclear Information System (INIS)

    Price, Wesley J.; Matthews, William L.

    1992-01-01

    During a December 1990 Waste Management Program Review held in Albuquerque, New Mexico, the Waste Management and Operational Surety Division (WMOSD) introduced the project control system to be used for the Waste Management (WM) Operations Program. The system was entitled 'TRAC-WM' (Tracking and Control for Waste Management). The stated objective for this system was to establish a frame work for planning, managing, and controlling work within the WM program. As a result Mason and Hanger (the operating contractor at the Pantex Plant) initiated the development of a computerized waste management project tracking system. (author)

  17. THE BASES OF THE MANAGEMENT OF SOCIAL PROJECTS OF BUSINESS

    Directory of Open Access Journals (Sweden)

    O. B. Zilberstein

    2015-01-01

    Full Text Available In article on wide material the author opens basic approaches to formation of the theoretical base of management of social projects of business.The purpose of work is generalization of theoretical bases of project management of business which have social character. The logic of a statement of material is under construction as follows. In water part of article authors do the assumption that at the heart of an object of research three basic elements are put: project management, social management and management of social projects. Proceeding from this assumption in work further reasonings are under construction. The main part of article contains three subsections. In the fi rst subsection of article defi nition of the concept «project management» is formulated and methodological approaches to project management (PRINCE2, PERT, the Model Agile, Lean Management, BRM are generalized. In the second subsection the author's understanding of entity of social management is presented and the main techniques of social management are considered, and also the characteristic of methodology of management of social projects is given. In the third subsection the author's concept of entity of management of social projects of business is formulated. In fi nal part of article authors draw a conclusion about the importance of management of social projects of business. This article, fi rst of all, has theoretical and methodological value for formation of eff ective methods and instruments of management of social projects of business, and also for development of the theory and practice of corporate social responsibility.

  18. Project management and administration of research and development

    International Nuclear Information System (INIS)

    Kim, Guk; Lee, Sang Bok; Eom, Ju Tae; An, Ha Eil

    1997-07-01

    This book mentions project and project management with project from production system of view, history of project management, writing way of network with definition and symbol of network, principle for drawing of network, draw up of network, I-J network and PDM network, general conception of PERT/CPM on definition of PERT, definition of CPM, comparison of PERT/CPM, discussion of PERT/CPM, WBS, work order and network, PDM calculation, cost management, reduction of construction time, R and D such as operation and R and D and analysis on R and D, system explanation of Nex-Pert.

  19. Project Communications Management

    OpenAIRE

    José C. Santiago-Guevara; Mauricio Rojas-Contreras; Luis A. Esteban-Villamizar

    2013-01-01

    This article presents a review in relation to the object of study: Communications Management as an important factor in the management of projects. The review includes the most relevant and most renowned authors in the field of project management, focusing on telecommunications projects, which lets you define a communications management model.

  20. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD. INTEGRATED DISPOSAL FACILITY (IDF)

    International Nuclear Information System (INIS)

    MCLELLAN, G.W.

    2007-01-01

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal issues as well as challenges with

  1. Development of advanced JGIS considering qualify management and project management

    International Nuclear Information System (INIS)

    Kawachi, Susumu; Ohi, Takao; Kawamura, Makoto; Ishihara, Yoshinao; Ebina, Takanori

    2008-03-01

    A system for managing and integrating the technical information of R and D was developed (JGIS: JAEA Geological Disposal Information Integration System). The subjects are to improve the usability as the system and the usability to record the information and the data in order to display the function of the system sufficiently and in order to enable the practical use of the system. In this study the aims are to display the function of JGIS and to enable the researchers as the users to recognize the significance of using JGIS. We built the conceptual design in order to implement the function of quality management and project management to JGIS. We considered that researchers could access the portal site of the research projects which were set as the WBS (Work Breakdown Structure) items and could confirm which WBS item the research project belonged to in the whole plan. We also considered that the research projects could be managed by using the conformity assessment sheets which were adopted for the quality management. The appendix contains the example of application of real projects to JGIS and the user's manual of JGIS (Example of a study of potential impact of natural phenomena). We demonstrated that researchers could confirm which WBS item the research project related to in JGIS and could manage the quality of the research projects by using the conformity assessment sheets in JGIS. (author)

  2. Strategic leadership of portfolio and project management

    CERN Document Server

    Kloppenborg, Timothy J

    2014-01-01

    As an executive in today's economy, your organization may have limited resources and bench strength. How can you and other leaders make the most of your company's assets? This book will instruct you and your leadership teams on implementing strategy through identifying, selecting, prioritizing, resourcing, and governing an optimal combination of projects and other work. Inside, you'll learn how to sponsor every project stage, as well as instruct your project managers and direct reports to follow your lead. Detailed advice is given for project management competency on utilizing input from customers, employees, and processes. Much of your organization's work is probably dependent on information technology and understanding and using information technology as a strategic weapon, and with this book, you'll learn how your organization can become competitive and how to effectively implement smart business strategies. This book outlines how these portfolio and project decisions have to be made based on both qualitat...

  3. Team and Project Work in Engineering Practices

    Directory of Open Access Journals (Sweden)

    Anders Buch

    2015-11-01

    Full Text Available In this article, we investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals. The article investigates how professional engineering practices are enacted in two engineering consultancy companies in Denmark where teamwork has been or is an ideal for organizing work. Through a practice-based lens, the article sets out to investigate, firstly, how discourses about team and project work affect engineering work practices; secondly, how technologymediated management is reconciled in teamwork practices; and thirdly, how team and project work affect engineering professionalism and collaborative work practices. A practice theoretical framework informs the analysis. Teamwork is investigated as a phenomenon enacted through the sayings, doings and relatings of practitioners in landscapes of practices and the interconnectedness of the practices is traced through the setup of specific ecologies in the sites.

  4. Project stakeholder management

    CERN Document Server

    Eskerod, Pernille

    2013-01-01

    Carrying out a project as planned is not a guarantee for success. Projects may fail because project management does not take the requirements, wishes and concerns of stakeholders sufficiently into account. Projects can only be successful though contributions from stakeholders. And in the end, it is the stakeholders that evaluate whether they find that the project is a success. To manage stakeholders effectively, you need to know your stakeholders, their behaviours and attitudes towards the project. In Project Stakeholder Management, the authors give guidance on how to adopt an analytical and s

  5. Successful project management

    CERN Document Server

    Young, Trevor L

    2016-01-01

    Successful Project Management, 5th edition, is an essential guide for anyone who wants to improve the success rate of their projects. It will help managers to maintain a balance between the demands of the customer, the project, the team and the organization. Covering the more technical aspects of a project from start to completion it contains practised and tested techniques, covering project conception and start-up, how to manage stake holders, effective risk management, project planning and launch and execution. Also including a brand new glossary of key terms, it provides help with evaluating your project as well as practical checklists and templates to ensure success for any ambitious project manager. With over one million copies sold, the hugely popular Creating Success series covers a wide variety of topic, with the latest editions including new chapters such as Tough Conversations and Treating People Right. This indispensable business skills collection is suited to a variety of roles, from someone look...

  6. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  7. Project management in practice : Evaluating a case project through project management theories

    OpenAIRE

    Uusitalo, Jenni

    2013-01-01

    The purpose of this thesis was to evaluate a case project and to study whether it was carried out in a correct manner; meaning that did the case project follow the project management models. In addition, part of the study was to determine what could have been improved in the management of the case project. The case project was about creating and launching a communication channel based on a social media service, on a blog platform called Tumblr, for Team Finland in Spain network. The network p...

  8. Relation of project managers' personality and project performance: An approach based on value stream mapping

    Directory of Open Access Journals (Sweden)

    Maurizio Bevilacqua

    2014-09-01

    Full Text Available Purpose: This work investigates the influence of project managers’ personality on the success of a project in a Multinational Corporation. The methodology proposed for analyzing the project managers’ personality is based on the Myers-Briggs Type Indicator.Design/methodology/approach: Forty projects carried out in 2012 by multinational corporation, concerning new product development (NPD, have been analyzed, comparing the profile of project managers with results obtained in terms of traditional performance indexes (time delay and over-budget of projects and performance indexes usually used in “Lean Production” sector (waste time and type of “wastes”. A detailed analysis of the most important “wastes” during the project development is carried out using the Value Stream Mapping (VSM technique.Findings and Originality/value: Relying on the Myers–Briggs personality instrument, results show that extroverted managers (as opposed to introverted managers carry out projects that show lower delay and lower waste time. Introverted managers often make “Over-processing” and “Defect” types of waste. Moreover, lower delay and over-budget have been shown by perceiving managers.Research limitations: Regarding the limitations of this work it is necessary to highlight that we collected data from project managers in a retrospective way. While we believe that several aspects of our data collection effort helped enhance the accuracy of the results, future research could conduct real-time case study research to get more detailed insights into the proposed relationships and avoid retrospective bias. Moreover we focused on a single respondent, the project manager. This helped us ensure that their interpretations played an important role in product development. But, we cannot examined the opinion of team members that could be different from project managers opinion regarding some questions.Originality/value: This research provides insight useful

  9. Parkinson's Law and Its Implications for Project Management

    OpenAIRE

    Genaro J. Gutierrez; Panagiotis Kouvelis

    1991-01-01

    Critical path models concerning project management (i.e. PERT/CPM) fail to account for work force behavioral effects on the expected project completion time. In this paper, we provide a modelling framework for project management activities, that ultimately accounts for expected worker behavior under Parkinson's Law. A stochastic activity completion time model is used to formally state Parkinson's Law. The developed model helps to examine the effects of information release policies on subcontr...

  10. 75 FR 2463 - Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers...

    Science.gov (United States)

    2010-01-15

    ... be considered a breach of contract and shall not entitle the Contractor to a price adjustment under... constitute a breach of this contract and shall not entitle the Contractor to any price adjustment under the... Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers Clauses...

  11. Forty project management strategies for the medical practice staff.

    Science.gov (United States)

    Hills, Laura Sachs

    2010-01-01

    Most every medical practice will embark at one time or another on a large and complex new project. The practice may, for instance, undertake a project in office construction or renovation, practice expansion, new technology, or a new large-scale event. The medical practice staff may find itself creating the project plan, overseeing its execution, and working through the plan day to day until its completion. In short, the staff may find itself responsible for project management. This article contains 40 specific, easy-to-implement project management strategies medical practice employees can use to manage both the large and small projects they undertake on behalf of the practice. It suggests effective project management strategies the staff can use before the onset of a new project as well as strategies to help define the project, to deliver the project, and to close and review the project. This article also describes five reasons medical practices often fail at project management and suggests more effective approaches that will ensure that the projects the medical practice undertakes are completed well, on time, and within budget.

  12. Working capital management in the process of financial support of investment and construction projects and of the construction material industry

    Science.gov (United States)

    Danilochkina, Nadezhda; Lukmanova, Inessa; Roshchina, Olga; Voytolovskiy, Nikolay

    2018-03-01

    The article presents the analysis of working capital in the process of financial support of high-rise construction investment projects. The factors influencing the choice of the working capital management model were analyzed, the reasons of the change in the requirement for the values of current assets in the process of construction of high-rise facilities were determined. The author has developed the scheme of interrelation between production, operational and financial activity cycles of enterprises implementing investment projects of unique buildings and structures and made a comparative description of their financing sources.

  13. Methodologies of Project Management

    Directory of Open Access Journals (Sweden)

    Wojciech Macek

    2011-07-01

    Full Text Available This paper presents comparison of three most popular project management standardsbelonging to a wider group of models (for example, PMBOK, Prince 2, CMMI, ISO 10006,BS 6079, IPMA Competence Baseline, European Commission Project Cycle ManagementGuidelines. The author discusses methods of project management according to PMBoK,Prince 2 and ISO 10006, some chosen criteria and fields of knowledge, such as generalregulations of standards, project range management, resources management, and processesconnected with risk, systems of project quality management.

  14. Your Project Management Coach Best Practices for Managing Projects in the Real World

    CERN Document Server

    Biafore, Bonnie

    2012-01-01

    A pragmatic approach to project management Many projects fail to deliver on time or on budget, or even to deliver a workable product that satisfies the customer. While good project management goes a long way towards ensuring success, managers often fail to follow the plans they implement. This unique guide helps you understand and successfully handle project management, once and for all. Covering practical ways to solve problems you'll typically face when managing actual projects, this pragmatic book takes you through a full project management lifecycle. You'll find ample tips, tricks, and bes

  15. Distributed Project Work

    DEFF Research Database (Denmark)

    Borch, Ole; Kirkegaard, B.; Knudsen, Morten

    1998-01-01

    Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work in a distr......Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work...... in a distributed fashion over the Internet needs more attention to the interaction protocol since the physical group room is not existing. The purpose in this paper is to develop a method for online project work by using the product: Basic Support for Cooperative Work (BSCV). An analysis of a well-proven protocol...... for information exchange in the traditional project environment is performed. A group of teachers and a student group using small project examples test the method. The first test group used a prototype for testing and found the new activity synchronization difficult to adapt, so the method was finally adjusted...

  16. AVLIS Production Plant Project Management Plan

    International Nuclear Information System (INIS)

    1984-01-01

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables

  17. Project Management as a means of knowledge communication for the Information economy

    DEFF Research Database (Denmark)

    Kampf, Constance

    Currently Project Management as a field is understood from an engineering and management perspective as a system of planning, managing and monitoring work processes involved in projects.  The systems focus does not preclude communication as an important element, but it does not synthesize...... communication concepts with project management practices. Understanding Project Management from a communication perspective entails synthesizing key concepts from Knowledge Communication, Knowledge Management and Rhetoric.  From Knowledge Communication, key concepts include Wenger's Communities of Practice...... (1998), Nonaka & Takeuchi´s' SECI model describing the relationship between tacit and explicit knowledge in the context of knowledge creation (1995), and Davenport & Prusak's problematization of knowledge definitions in Working Knowledge (1998, 2000).  From a Knowledge Management Perspective, key...

  18. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD INTEGRATED DISPOSAL FACILITY (IDF)

    Energy Technology Data Exchange (ETDEWEB)

    MCLELLAN, G.W.

    2007-02-07

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal

  19. Managing Projects for Change: Contextualised Project Management

    Science.gov (United States)

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  20. Distributed Project Work

    DEFF Research Database (Denmark)

    Borch, Ole; Kirkegaard, B.; Knudsen, Morten

    1998-01-01

    for information exchange in the traditional project environment is performed. A group of teachers and a student group using small project examples test the method. The first test group used a prototype for testing and found the new activity synchronization difficult to adapt, so the method was finally adjusted...... to be very precises and with success used on the second test group. Distributed project work is coming pretty soon and with little improvement in server tools, projects in different topics with a large and inhomogeneous profile of users are realistic.......Project work has been used for many years at Aalborg University to improve learning of theory and methods given in courses. In a closed environment where the students are forming a group in a single room, the interaction behaviour is more or less given from the natural life. Group work...

  1. PROJECT MANAGER SKILLS, RISK MANAGEMENT TOOLS

    Directory of Open Access Journals (Sweden)

    Vladut Iacob

    2013-12-01

    Full Text Available Although the projects are different from each other there are many common things that contribute to their success. Looked overall, the success of a project is the result of a multitude of factors. This person is considered the "engine" of the project. The man who makes the action set for the achievement of project objectives to be brought to an end. The project manager must have the technical knowledge and economic diverse. He should be able to choose a team and lead. You must be tenacious, combative, to know how to communicate both within the team and beyond. In a word, the project manager must have an impressive stock of knowledge, skills and abilities and appreciate as Peter Drucker, to "exist for the organization. To be its servant. Any management who forget this will only cause damage to the organization. "This study will focus on highlighting the skills of the project manager and their role in managing difficult situations or risk.

  2. From project management to project leadership

    NARCIS (Netherlands)

    Braun, F.; Avital, M.

    2010-01-01

    It is virtually a truism that good leadership practices can help project managers with attaining the desired project outcome. However, a better understanding of which leadership practices enable project managers to be more effective warrants further investigation. Subsequently, in this study, we

  3. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  4. Web Project Management

    OpenAIRE

    Suralkar, Sunita; Joshi, Nilambari; Meshram, B B

    2013-01-01

    This paper describes about the need for Web project management, fundamentals of project management for web projects: what it is, why projects go wrong, and what's different about web projects. We also discuss Cost Estimation Techniques based on Size Metrics. Though Web project development is similar to traditional software development applications, the special characteristics of Web Application development requires adaption of many software engineering approaches or even development of comple...

  5. Collective work: a challenge for health management.

    Science.gov (United States)

    Scherer, Magda Duarte Dos Anjos; Pires, Denise; Schwartz, Yves

    2009-08-01

    Based on ergology and work process theorization, the study aims to contribute to reflections on health collective work, emphasizing its specificity and difficulties in building and managing groups of workers. It deals with work as a human activity that dialectically comprises the application of a prescribed protocol and a unique and historical perspective. Health work involves a relationship among individuals who act in the drama of using themselves and manage their own work; it is influenced by the history of health professions and macro-political determinations. In conclusion, this health work complexity needs to be considered in the process of management of professional teams/groups of workers, in a way that actions can interact and enable the implementation of a new health care project in the perspective of comprehensiveness.

  6. Project management case studies

    CERN Document Server

    Kerzner, Harold R

    2013-01-01

    A new edition of the most popular book of project management case studies, expanded to include more than 100 cases plus a ""super case"" on the Iridium Project Case studies are an important part of project management education and training. This Fourth Edition of Harold Kerzner''s Project Management Case Studies features a number of new cases covering value measurement in project management. Also included is the well-received ""super case,"" which covers all aspects of project management and may be used as a capstone for a course. This new edition:Contains 100-plus case studies drawn from re

  7. MRS project management

    International Nuclear Information System (INIS)

    Doman, J.W.; Vlahakis, J.

    1992-01-01

    Management of projects under the control of the Office of Civilian Radioactive Waste Management within the Department of Energy is subject to overview by a variety of internal and external entities. This paper reports that effective project management often requires balancing of conflicting directions and conflicting agendas of the different entities in order to proceed with implementation of the Monitored Retrievable Storage project

  8. Management of Software Development Projects

    Directory of Open Access Journals (Sweden)

    Felician ALECU

    2011-04-01

    Full Text Available Any major software development starts with the Initiating process group. Once the charter document is approved, the Planning and then to the Executing stages will follow. Monitoring and Controlling is measuring the potential performance deviation of the project in terms of schedule and costs and performs the related Integrated Change Control activities. At the end, during the Closing, the program/project manager will check the entire work is completed and the objectives are met.

  9. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  10. Project management system for the decommissioning of research reactors

    International Nuclear Information System (INIS)

    Park, J. H.

    2006-01-01

    KAERI has developed a computer information system, named DECOMMIS, for the project management with the increased effectiveness of the decommissioning projects and the record keeping for a next decommissioning project. The management system consists of three parts, code management system, data input system (DDIS) and data processing and output system (DDPS). Through the DDIS, the data can be directly inputted at sites and the system can play roles of daily work reports to minimize the time gap between the dismantling activities and the evaluation of the data for project management. The DDPS provides useful information to the staff for more effective project management and this information include several fields, such as project progress management, man power management, waste management, radiation dose of workers and so on. It is expected that the system would enable to maintain the decommissioning data, to prepare the source data for the R and D for development of planning tools and to give information to the staff for the decision on the progress of the projects. In this paper, the overall system will be briefly explained and several examples of the utilization, focused on the waste and manpower control, for the project management will be introduced

  11. An IS Project Management Course Project

    Science.gov (United States)

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  12. WORK BREAKDOWN STRUCTURE FORMATION FOR IT-PROJECT OF INFORMATION SYSTEM DEVELOPMENT

    Directory of Open Access Journals (Sweden)

    Виктор Макарович ЛЕВЫКИН

    2015-06-01

    Full Text Available The approach for modeling the structure of IT-works project to create an information system as a forest domain ontology. The main features of information technology to manage such IT-projects.

  13. Perspectives on projects, project success and team work

    OpenAIRE

    Thompson, Karen

    2015-01-01

    This paper brings together perspectives on projects, project success and team work as a background to two graphical tools for considering project success and individual capabilities for working in a project team.

  14. PROJECT MANAGEMENT AND RELATIONSHIP MARKETING: INTERSECTIONS FOR STAKEHOLDER MANAGEMENT IN PROJECTS

    Directory of Open Access Journals (Sweden)

    Ronielton Rezende Oliveira

    2017-06-01

    Full Text Available Projects development is essential for organizations. Among the factors originated in projects that influence performance is quality. This variable must be managed to meet the expectations of the stakeholders and this can only be achieved through effective monitoring and control. It can be seen that relationship marketing is relevant to the competitive reality of contemporary organizations. With the purpose of contributing to organizational studies, this theoretical essay proposes to approach project management in relationship marketing. In the context of integrated management, it is discussed how management action can be applied to engage and involve stakeholders in projects, in order to create value and achieve the expectations sustained by the execution of the projects. Based on the reflection, the quality of relationship management is pointed out as a construct of higher order, composed of at least two dimensions: trust and satisfaction.

  15. A Statistical Project Control Tool for Engineering Managers

    Science.gov (United States)

    Bauch, Garland T.

    2001-01-01

    This slide presentation reviews the use of a Statistical Project Control Tool (SPCT) for managing engineering projects. A literature review pointed to a definition of project success, (i.e., A project is successful when the cost, schedule, technical performance, and quality satisfy the customer.) The literature review also pointed to project success factors, and traditional project control tools, and performance measures that are detailed in the report. The essential problem is that with resources becoming more limited, and an increasing number or projects, project failure is increasing, there is a limitation of existing methods and systematic methods are required. The objective of the work is to provide a new statistical project control tool for project managers. Graphs using the SPCT method plotting results of 3 successful projects and 3 failed projects are reviewed, with success and failure being defined by the owner.

  16. Supply Chain Management in Flyover Projects in India

    Directory of Open Access Journals (Sweden)

    Sudhir Yadav

    2015-01-01

    Full Text Available This paper explores the application of supply chain management (SCM in the Indian construction industry. The authors studied the SCM practices followed in flyover projects and compared them with the seamless SCM model for construction proposed by a previous study. A case study approach was followed for the research work. Structured interviews were conducted to understand the SCM practices in flyover projects in India. The developed model advocates leading roles for client and strategic needs analysis and value management study that are missing in the studied projects. All of the projects studied faced cost and time overruns. The seamless SCM model may be extended to developing countries by incorporating requirements related to the long-term relationship between project agents and, if possible, by suggesting that clients should not select agents using only the minimal cost criteria. The extended model also proposes SCM training for all project agents before the start of the project. Strategic needs analysis and value management study should be an integral part of the construction project to improve project efficiency. Implementing the seamless SCM model calls for the early involvement (i.e., at the project design stage of all project agents. Project sponsors can apply the findings of this study to manage time and cost overruns.

  17. Project Management of a personnel radiation records computer system

    International Nuclear Information System (INIS)

    Labenski, T.

    1984-01-01

    Project Management techniques have been used to develop a data base management information system to provide storage and retrieval of personnel radiation and Health Physics records. The system is currently being developed on a Hewlett Packard 1000 Series E Computer with provisions to include plant radiation survey information, radiation work permit information, inventory management for Health Physics supplies and instrumentation, and control of personnel access to radiological controlled areas. The methodologies used to manage the overall project are presented along with selection and management of software vendors

  18. Project management plan for exploratory shaft at Yucca Mountain

    International Nuclear Information System (INIS)

    1983-08-01

    This Project Management Plan (PMP) provides the basic guidance and describes the organizational structure and procedures for the design, construction, and testing of a large-diameter Exploratory Shaft (ES) in tuffaceous media as a major element within the Nevada Nuclear Waste Storage Investigations (NNWSI) project, which is a part of the National Waste Terminal Storage (NWTS) Program, US Department of Energy (DOE). The PMP encompasses activities identified as construction phase and in situ phase testing to be conducted from the ES through September 30, 1986. Specific topics addressed are the ES project objectives, the management organization and responsibilities, functional support requirements, work plan (including quality assurance aspects), work breakdown structure, milestone schedule, logic diagram, performance criteria, cost estimates, management control systems, procurement plan, test plan, and environmental, health and safety plans

  19. Management of research and development project

    International Nuclear Information System (INIS)

    Go, Seok Hwa; Hong Jeong Yu; Hyun, Byeong Hwan

    2010-12-01

    This book introduces summary on management of research and development project, prepare of research and development with investigation and analysis of paper, patent and trend of technology, structure of project, management model, management of project, management of project range, management of project time, management of project cost, management of project goods, management of project manpower, management of communication, management of project risk, management of project supply, management of outcome of R and D, management of apply and enroll of patent and management of technology transfer.

  20. Decommissioning project management unit started its activities

    International Nuclear Information System (INIS)

    Medeliene, D.

    2002-01-01

    The Decommissioning Project Management Unit team comprises western experts as well as experts from INPP Decommissioning Service who all work as a single team. The DPMU will develop the Final Decommissioning Plan and a more detailed Decommissioning Project, which will describe how the plant will be removed from service and safely decommissioned

  1. Application of the graded management approach to Battelle's nuclear project

    International Nuclear Information System (INIS)

    Voth, C.B.

    1996-01-01

    Battelle's graded management approach provides an effective and efficient method to perform the Battelle Columbus Laboratories Decommissioning Project (BCLDP). The project is managed by Battelle under their US Nuclear Regulatory Commission (NRC) license but is partially funded by the US Department of Energy (DOE) on a cost-shared basis. Battelle's graded management approach adheres to the regulations and orders governing the BCLDP by the interaction of various plans, procedures, permits, and work instructions. By independent assessment, quality control, and worker training, Battelle has been able to establish a cost-effective approach to performing work and, at the same time, have a controlled checks and balance system to assure the proper safety considerations and project particulars are taken into account

  2. Managing clinical improvement projects.

    Science.gov (United States)

    Phillips, Joanna; Simmonds, Lorraine

    This paper, the second of a three-part series looking at change management tools, provides a practical guide on how to use common project management principles in practice. Much of the literature on project management focuses on the business arena, with little reference to clinical settings. Identifying this literature and understanding its relevance to managing projects in healthcare can be difficult. This article provides a practical guide to identifying the key principles of good project management and applying these in health settings.

  3. Project management metrics, KPIs, and dashboards a guide to measuring and monitoring project performance

    CERN Document Server

    Kerzner, Harold

    2017-01-01

    With the growth of complex projects, stakeholder involvement, and advancements in visual-based technology, metrics and KPIs (key performance indicators) are key factors in evaluating project performance. Dashboard reporting systems provide accessible project performance data, and sharing this vital data in a concise and consistent manner is a key communication responsibility of all project managers. This 3rd edition of Kerzner’s groundbreaking work includes the following updates: new sections on processing dashboard information, portfolio management PMO and metrics, and BI tool flexibility. PPT decks by chapter and a test bank will be available for use in seminar presentations and courses.

  4. Hanford environmental management program multi-year work plan FY1998

    International Nuclear Information System (INIS)

    Giese, K.A.

    1997-01-01

    The Environmental Support FY 1998 Multi-Year Work Plan (MYWP), consisting of the Hanford Environmental Management Program (HEMP) and the Effluent and Environmental Monitoring (EEM) Program MYWP is prepared to specifically establish the execution year's work scope, budget targets, and schedule baselines. The work plan contains the work breakdown structure (WBS) and the WBS dictionary, milestone listings and milestone description sheets, and cost targets that the program manager will use to manage program work for the fiscal year. Where activities required to maintain or attain compliance with environmental requirements and agreements are impacted as a result of a reduction of the authorized funds, the ''Work Authorization'' identifies the impacted scope and requires the Contracting Officer's or Assistant Manager-Contracting Officer's Representative signature. Change requests will be submitted to RL by the contractor for approval, further documenting the impacts of any environmental and agreement noncompliances as a result of funding limitations. This is the first year that the MYWPs are submitted under the new Project Hanford Management Contractor (PHMC). The MYWPs are structured differently than in prior years. The MYWP is divided into two main sections. Section One is titled the ''Project Summary Section'' and Section Two is titled the ''Additional Sections at the Project Baseline Summaries Level''. Section One is where the major project summary-level information is provided. Section Two is designed to detail the information for each Project Baseline Summary (PBS) that falls under the purview of the major project listed in Section One. Considering all of the PHMC MYWPs, the HEMP and EEM programs are the one exception to the above description. HEMP and EEM are two of five separate programs that are organized under one common PBS that is titled Mission Support (PBS number-sign RL-OT01). RL has given guidance that HEMP and EEM will be submitted as one common MYWP

  5. Managing Distributed Software Projects

    DEFF Research Database (Denmark)

    Persson, John Stouby

    Increasingly, software projects are becoming geographically distributed, with limited face-toface interaction between participants. These projects face particular challenges that need careful managerial attention. This PhD study reports on how we can understand and support the management...... of distributed software projects, based on a literature study and a case study. The main emphasis of the literature study was on how to support the management of distributed software projects, but also contributed to an understanding of these projects. The main emphasis of the case study was on how to understand...... the management of distributed software projects, but also contributed to supporting the management of these projects. The literature study integrates what we know about risks and risk-resolution techniques, into a framework for managing risks in distributed contexts. This framework was developed iteratively...

  6. Planning and managing future space facility projects. [management by objectives and group dynamics

    Science.gov (United States)

    Sieber, J. E.; Wilhelm, J. A.; Tanner, T. A.; Helmreich, R. L.; Burgenbauch, S. F.

    1979-01-01

    To learn how ground-based personnel of a space project plan and organize their work and how such planning and organizing relate to work outcomes, longitudinal study of the management and execution of the Space Lab Mission Development Test 3 (SMD 3) was performed at NASA Ames Research Center. A view of the problems likely to arise in organizations and some methods of coping with these problems are presented as well as the conclusions and recommendations that pertain strictly to SMD 3 management. Emphasis is placed on the broader context of future space facility projects and additional problems that may be anticipated. A model of management that may be used to facilitate problem solving and communication - management by objectives (MBO) is presented. Some problems of communication and emotion management that MBO does not address directly are considered. Models for promoting mature, constructive and satisfying emotional relationships among group members are discussed.

  7. Office of River Protection: Simplifying Project management tools

    International Nuclear Information System (INIS)

    TAYLOR, D.G.

    2000-01-01

    The primary approach to the effort was to form a multi-organizational team comprised of federal and contractor staff to develop and implement the necessary tools and systems to manage the project. In late 1999 the DOE Manager of the Office of River Protection formed the Project Integration Office to achieve the objective of managing the efforts as a single project. The first major task, and the foundation upon which to base the development of all other tools, was the establishment of a single baseline of activities. However, defining a single scope schedule and cost was a difficult matter indeed. Work scopes were available throughout the project, but the level of detail and the integration of the activities existed primarily between working groups and individuals and not on a project-wide basis. This creates a situation where technical needs, logic flaws, resource balancing, and other similar integration needs are not elevated for management attention and resolution. It should be noted that probably 90% of the interface issues were known and being addressed. The key is simplifying the process and providing tangible assurance that the other 10% does not contain issues that can delay the project. Fortunately all of the contractors employed a common scheduling tool, which served as the basis for first communicating and then integrating baseline activities. Utilizing a powerful computer-based scheduling tool, it was soon possible to integrate the various schedules after the following was accomplished: Establishment of a scheduling specification (standardized input, coding, and approach to logic); and Clearly defined project assumptions

  8. Application UPTASK project management platform to support management decisions in I.T.

    Directory of Open Access Journals (Sweden)

    Lagerev D.G.

    2017-03-01

    Full Text Available Project planning and management accounting of all factors, in terms of multitasking and spontaneity of project man-agement, the task is very voluminous and complex, especially in isolation from the methodological and instrumentation. Calculation of indicators and statistical metrics, and strategies, the decision maker may be biased or incorrect character, and one can’t exclude the human factor. In such a perspective, it was decided to automate the process of statistical anal-ysis and probabilistic forecasting to help the decision-maker, as much as the right choice of strategic and project plan-ning. The problem is solved by means of the development of the project management system for the companies of the areas of information technology. One of the most important features of the development of a module statistical and probabilistic analysis based on Bayesian networks. The use of the proposed tool and methodological complex, will pro-vide a high level of optimization of the allocation of time to work processes and will increase the degree of correctness and continuity of decisions taken by the project manager.

  9. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  10. Software Support for the Classical, Contemporary and Future Project Management

    Directory of Open Access Journals (Sweden)

    Jakov Crnkovic

    2006-04-01

    Full Text Available The volume and complexity of Project Management (PM raises many questions for managers. What exactly are we managing? People? Performance? Efficiency? Effectiveness? Cost? Time? At what levels do projects become challenging and worthy of significant management attention? Can some projects be left on auto-pilot? Must others be managed more aggressively? What metrics are useful in Project Management? How can they be integrated with normal performance metrics in the organization? How can metrics be built into assessment programs that work? How can projects be monitored, re-planned to stay within the original budget and schedule deadlines? How good is the PM software support? Do we really need PM software packages or it should be the integral part of the company's information system (IS? Where is the knowledge about company's previous projects and performance? Are we able to establish company or even industry wide standards for project management? Can we (or should we move from the PMBOK® guidelines and use other approaches? We discussing important questions in PM: software products, responsibilities for concurrently executing several projects (multi-projects with multi objectives and multiple deadlines, introducing a need for initiation, design, execution, and control using a virtual project management and application of the organizational project maturity model.

  11. Project management process.

    Science.gov (United States)

    2007-03-01

    This course provides INDOT staff with foundational knowledge and skills in project management principles and methodologies. INDOTs project management processes provide the tools for interdisciplinary teams to efficiently and effectively deliver pr...

  12. The Kozloduy project management unit

    International Nuclear Information System (INIS)

    Carnes, W.S.; Gros-Gean, P.; Demireva, E.

    2004-01-01

    The Project Management Unit (PMU) has been established in support to the Kozloduy NPP decommissioning department. It is comprised of a Consortium of the British Nuclear Group, EDF and subcontractor ENPRO Consult. It is responsible for the management of seven projects (a facility for dry storage of spent fuel; equipment to treat low activity liquid radioactive waste; provision of physical separation of the plant systems and areas to be decommissioned from the ones in operation; equipment to decontaminate and clean pools and large tanks; a facility to provide high volume reduction of solid radioactive wastes and retrieval and conditioning of ion exchange resins and other sorbents; equipment to provide measurement for the free-release of materials and components; a facility for personnel monitoring, decontamination and clothes changing for work outside of the normal radiological control areas) that will be used in support of the KNPP decommissioning process. The projects will be tendered in compliance with the European Bank for Reconstruction and Development requirements

  13. Project management for humans helping people get things done

    CERN Document Server

    Harned, Brett

    2017-01-01

    Project management—it’s not just about following a template or using a tool, but rather developing personal skills and intuition to find a method that works for everyone. Whether you’re a designer or a manager, Project Management for Humans will help you estimate and plan tasks, scout and address issues before they become problems, and communicate with and hold people accountable.

  14. The Colorado Front Range Ecosystem Management Research Project: Accomplishments to date

    Science.gov (United States)

    Brian Kent; Wayne D. Shepperd; Deborah J. Shields

    2000-01-01

    This article briefly describes the goals and objectives for the Colorado Front Range Ecosystem Management Project (FREM). Research under this project has addressed both biophysical and human dimensions problems relating to ecosystem management in the Colorado Front Range. Results of completed work are described, and the status of the ongoing demonstration project at...

  15. Project Manager Performance and the Decision to Backsource the Project Management Office

    Science.gov (United States)

    Lively, William R.

    2014-01-01

    This paper reviews a management decision of an Information Technology Outsource (ITO) provider to backshore the management oversight of its Project Management Office (PMO) after only one year of offshore operations. Governance is a term used in project management to refer to management oversight. The review is a quantitative analysis of existing…

  16. Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline

    International Nuclear Information System (INIS)

    Gelles, C. M.; Sheppard, F. R.

    2002-01-01

    This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program

  17. Integrating a Procurement Management Process into Critical Chain Project Management (CCPM: A Case-Study on Oil and Gas Projects, the Piping Process

    Directory of Open Access Journals (Sweden)

    Sung-Hwan Jo

    2018-05-01

    Full Text Available Engineering, Procurement, and Construction (EPC of oil and gas megaprojects often experience cost overruns due to substantial schedule delays. One of the greatest causes of these overruns is the mismanagement of the project schedule, with the piping works (prefabrication and installation occupying a majority of that schedule. As such, an effective methodology for scheduling, planning, and controlling of piping activities is essential for project success. To meet this need, this study used the Critical Chain Project Management (CCPM to develop a piping construction delay prevention methodology, incorporating material procurement processes for EPC megaprojects. Recent studies indicate that the traditional scheduling method used on oil and gas mega projects has critical limitations regarding resource scarcity, calculation of activity duration, and dealing with uncertainties. To overcome these limitations, the Theory of Constraints-based CCPM was proposed and implemented to provide schedule buffers management. Nonexistent in literature, and of critical importance, is this paper’s focus on the resource buffer, representing material uncertainty and management. Furthermore, this paper presents a step-by-step process and flow chart for project, construction, and material managers to effectively manage a resource buffer through the CCPM process. This study extends the knowledge of traditional resource buffers in CCPM to improve material and procurement management, thus avoiding the shortage of piping materials and minimizing delays. The resultant process was validated by both deterministic and probabilistic schedule analysis through two case studies of a crude pump unit and propylene compressor installation at a Middle Eastern Refinery Plant Installation. The results show that the CCPM method effectively handles uncertainty, reducing the duration of piping works construction by about a 35% when compared to the traditional method. Furthermore, the

  18. Project Management Techniques

    OpenAIRE

    Mihalache Anita; Salagean Liana

    2010-01-01

    Project management is a technique that can aid in the planning, scheduling, and monitoring of complex projects characterized by numerous, non repetitive jobs called activities. Examples of projects that would use project management include: - developing a mass rapid – transit system for a metropolitan area; - organizing the relocation of a corporate headquarters; - planning the production of a concert, film, or play; - developing and marketing a new automobile; - constructing a high – rise of...

  19. Project Management Web Tools at the MICE experiment

    CERN Multimedia

    CERN. Geneva

    2012-01-01

    Project management tools like Trac are commonly used within the open-source community to coordinate projects. The Muon Ionization Cooling Experiment (MICE) uses the project management web application Redmine to host mice.rl.ac.uk. Many groups within the experiment have a Redmine project: analysis, computing and software (including offline, online, controls and monitoring, and database subgroups), executive board, and operations. All of these groups use the website to communicate, track effort, develop schedules, and maintain documentation. The issue tracker is a rich tool that is used to identify tasks and monitor progress within groups on timescales ranging from immediate and unexpected problems to milestones that cover the life of the experiment. It allows the prioritization of tasks according to time-sensitivity, while providing a searchable record of work that has been done. This record of work can be used to measure both individual and overall group activity, identify areas lacking sufficient personne...

  20. Project Management Plan for the INEL technology logic diagrams

    International Nuclear Information System (INIS)

    Rudin, M.J.

    1992-10-01

    This Project Management Plan (PjMP) describes the elements of project planning and control that apply to activities outlined in Technical Task Plan (TTP) ID-121117, ''Technology Logic Diagrams For The INEL.'' The work on this project will be conducted by personnel in EG ampersand G Idaho, Inc.'s Waste Technology Development Program. Technology logic diagrams represent a formal methodology to identify technology gaps or needs within Environmental Restoration/Waste Management Operations, which will focus on Office of Environmental Restoration and Waste Management (EM-50) research and development, demonstration, test, and evaluation efforts throughout the US Department of Energy complex. This PjMP describes the objectives, organization, roles and responsibilities, workscope and processes for implementing and managing the technology logic diagram for the Idaho National Engineering Laboratory project

  1. Servant leadership behaviors of aerospace and defense project managers and their relation to project success

    Science.gov (United States)

    Dominik, Michael T.

    The success of a project is dependent in part on the skills, knowledge, and behavior of its leader, the project manager. Despite advances in project manager certifications and professional development, the aerospace and defense industry has continued to see highly visible and expensive project failures partially attributable to failures in leadership. Servant leadership is an emerging leadership theory whose practitioners embrace empowerment, authenticity, humility, accountability, forgiveness, courage, standing back, and stewardship, but has not yet been fully examined in the context of the project manager as leader. The objective of this study was to examine the relationship between servant leadership behaviors demonstrated by aerospace and defense project managers and the resulting success of their projects. Study participants were drawn from aerospace and defense oriented affinity groups from the LinkedInRTM social media web system. The participants rated their project managers using a 30-item servant leadership scale, and rated the success of their project using a 12-item project success scale. One hundred and fifteen valid responses were analyzed from 231 collected samples from persons who had worked for a project manager on an aerospace and defense project within the past year. The results of the study demonstrated statistically significant levels of positive correlation to project success for all eight servant leadership factors independently evaluated. Using multiple linear regression methods, the servant leadership factors of empowerment and authenticity were determined to be substantial and statistically significant predictors of project success. The study results established the potential application of servant leadership as a valid approach for improving outcomes of projects.

  2. Legacy material work-off project

    International Nuclear Information System (INIS)

    Sloan, T.J.; Baker, D.H. IV

    1999-01-01

    Los Alamos National Laboratory (LANL) and its subcontractors recently completed a nine-month legacy material clean-up effort. Legacy materials were defined as chemicals, hazardous, non-hazardous, and both hazardous and radioactive (mixed), that no longer served a programmatic use and had no identified individual owner within the Laboratory. Once personnel identified the legacy materials, the items were transferred to Solid Waste Operation's (EM-SWO) control. Upon completing this process, the responsible division-level manager was required to certify that all non-radioactive hazardous and non-hazardous materials and acceptable mixed legacy materials had been identified and transferred to EM-SWO for proper handling or disposal. The major expense in this project was the cost of actual chemical and radiological analysis. This expense was the result of items not having an identified individual owner. The major benefit of this project is that LANL is now in an excellent position to implement its Integrated Safety Management (ISM) Plan, which requires the implementation of safe work practices, including requirements for removing unused items when vacating workspaces. Effective implementation of ISM will go a long way toward ensuring that legacy materials are no longer an issue at the Laboratory

  3. The Impact of Project Management Maturity upon IT/IS Project Management Outcomes

    Science.gov (United States)

    Carcillo, Anthony Joseph, Jr.

    2013-01-01

    Although it is assumed that increasing the institutionalization (or maturity) of project management in an organization leads to greater project success, the literature has diverse views. The purpose of this mixed methods study was to examine the correlation between project management maturity and IT/IS project outcomes. The sample consisted of two…

  4. Dryden Flight Research Center Critical Chain Project Management Implementation

    Science.gov (United States)

    Hines, Dennis O.

    2012-01-01

    In Fiscal Year 2011 Dryden Flight Research Center (DFRC) implemented a new project management system called Critical Chain Project Management (CCPM). Recent NASA audits have found that the Dryden workforce is strained under increasing project demand and that multi-tasking has been carried to a whole new level at Dryden. It is very common to have an individual work on 10 different projects during a single pay period. Employee surveys taken at Dryden have identified work/life balance as the number one issue concerning employees. Further feedback from the employees indicated that project planning is the area needing the most improvement. In addition, employees have been encouraged to become more innovative, improve job skills, and seek ways to improve overall job efficiency. In order to deal with these challenges, DFRC management decided to adopt the CCPM system that is specifically designed to operate in a resource constrained multi-project environment. This paper will discuss in detail the rationale behind the selection of CCPM and the goals that will be achieved through this implementation. The paper will show how DFRC is tailoring the CCPM system to the flight research environment as well as laying out the implementation strategy. Results of the ongoing implementation will be discussed as well as change management challenges and organizational cultural changes. Finally this paper will present some recommendations on how this system could be used by selected NASA projects or centers.

  5. The Environmental Management Project Manager's Handbook for improved project definition

    International Nuclear Information System (INIS)

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook

  6. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    Science.gov (United States)

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  7. The Role and the Effects of Risk Management in IT Projects Success

    Directory of Open Access Journals (Sweden)

    Otniel DIDRAGA

    2013-01-01

    Full Text Available The success of IT projects is influenced by risk and risk management according to the existing project management literature. The paper emphasizes the role of risk management and its contribution to projects success in the existing literature. The methodology applied is based on documentary study review and analysis of the concepts used by the literature. We analyzed the literature published between 1978 and 2012 from the main IT project management journals and publications. The results are that risk management is a very important component of the project management process and it is assumed implicitly to work in favour of project success. We also performed a quantitative analysis of how risk management processes affect the subjective and objective performance of IT projects in Romanian IT companies.

  8. Project management in health informatics.

    Science.gov (United States)

    Ho, Jessica

    2010-01-01

    This chapter gives an educational overview of: * the concept of project management and its role in modern management * the generic project lifecycle process * processes used in developing a plan for the management of resources - time, cost, physical resources and people * the concept of managing risk in projects * communication processes and practices that are important to the management of projects.

  9. Management Innovations in Higher Education: A Descriptive Study of Information Technology Managers' Perceptions Regarding the Use and Value of Project Management in Institutions of Higher Education

    Science.gov (United States)

    Durbin, Michael P.

    2013-01-01

    This study examined the perspectives of IT managers working in colleges and universities regarding their use of and value for project management. Descriptive and inferential analyses were used to understand individual innovativeness, innovation characteristics of project management, and the perceived use of and value for project management best…

  10. Project management for engineers

    CERN Document Server

    Bennett, Michael J

    2014-01-01

    Project Management for Engineers, as the title suggests, is a direct attempt at addressing the ever-increasing and specific needs for better project management of engineering students, practicing engineers and managers in the industry. It aims not only to present the principles and techniques of Project Management, but also to discuss project management standards, processes and requirements, such as PMBOK, IEEE and PRINCE. Each chapter begins with the basics of the theme being developed at a level understandable to an undergraduate, before more complex topics are introduced at the end of each section that are suitable for graduate students. For the practicing professionals or managers in the industry, the book also provides many real illustrations of practical application of the principles of Project Management. Through a realistic blend of theory and practical examples, as well as an integration of the engineering technical issues with business issues, this book seeks to remove the veil of mystery that has...

  11. Spent Nuclear Fuel Project document control and Records Management Program Description

    International Nuclear Information System (INIS)

    MARTIN, B.M.

    2000-01-01

    The Spent Nuclear Fuel (SNF) Project document control and records management program, as defined within this document, is based on a broad spectrum of regulatory requirements, Department of Energy (DOE) and Project Hanford and SNF Project-specific direction and guidance. The SNF Project Execution Plan, HNF-3552, requires the control of documents and management of records under the auspices of configuration control, conduct of operations, training, quality assurance, work control, records management, data management, engineering and design control, operational readiness review, and project management and turnover. Implementation of the controls, systems, and processes necessary to ensure compliance with applicable requirements is facilitated through plans, directives, and procedures within the Project Hanford Management System (PHMS) and the SNF Project internal technical and administrative procedures systems. The documents cited within this document are those which directly establish or define the SNF Project document control and records management program. There are many peripheral documents that establish requirements and provide direction pertinent to managing specific types of documents that, for the sake of brevity and clarity, are not cited within this document

  12. Managing the Right Projects: Best Practices to Align Project and Corporate Strategies

    Science.gov (United States)

    Watkins, Bobby

    2012-01-01

    If there's a human endeavor that exemplifies teamwork, it is space exploration. And that teamwork absolutely cannot happen effectively if the boots on the ground the people doing the work - don't understand how their work aligns with the larger goal. This presentation will discuss some best management practices from NASA's Marshall Space Flight Center that have succeeded in helping employees become informed, engaged and committed to the space agency's important missions. Specific topics include: Alignment Criteria: Linking Projects To Corporate Strategy. Resource Management: Best Practices For Resource Management. Strategic Analysis: Supporting Decision Making In A Changing Environment. Communication Strategies: Best Practices To Communicate Change. Benefits Achieved And Lessons Learned.

  13. Intelligent Materials Tracking System for Construction Projects Management

    Directory of Open Access Journals (Sweden)

    Narimah Kasim

    2015-05-01

    Full Text Available An essential factor adversely affecting the performance of construction projects is the improper handling of materials during site activities. In addition, paper-based reports are mostly used to record and exchange information related to the material components within the supply chain, which is problematic and inefficient. Generally, technologies (such as wireless systems and RFID are not being adequately used to overcome human errors and are not well integrated with project management systems to make tracking and management of materials easier and faster. Findings from a literature review and surveys showed that there is a lack of positive examples of such tools having been used effectively. Therefore, this research focused on the development of a materials tracking system that integrates RFID-based materials management with resources modelling to improve on-site materials tracking. Rapid prototyping was used to develop the system and testing of the system was carried out to examine the functionality and working appropriately. The proposed system is intended to promote the employment of RFID for automatic materials tracking with integration of resource modelling (Microsoft (R Office Project in the project management system in order to establish which of the tagged components are required resources for certain project tasks. In conclusion, the system provides an automatic and easy tracking method for managing materials during materials delivery and inventory management processes in construction projects.

  14. FRG sealed isotopic heat sources project (C-229) project management plan

    International Nuclear Information System (INIS)

    Metcalf, I.L.

    1997-01-01

    This Project Management Plan defines the cost, scope, schedule, organizational responsibilities, and work breakdown structure for the removal of the Federal Republic of Germany (FRG) Sealed Isotopic Heat Sources from the 324 Building and placed in interim storage at the Central Waste Complex (CWC)

  15. CONTEMPORARY TRENDS IN PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Ana Argirova

    2015-09-01

    Full Text Available The modern information society in ever increasing business projects and time limits to achieve the objectives at minimum cost leads to a search for ways to manage them. Today, more and more managers use IT tools for project management, and the term itself is associated with software solutions for the optimization and management of projects in different fields of human activity. The paper examines the main characteristics of project management by means of information technology. Key tasks and processes in the project implementation and management are discussed.

  16. Improving Project Management Using Formal Models and Architectures

    Science.gov (United States)

    Kahn, Theodore; Sturken, Ian

    2011-01-01

    This talk discusses the advantages formal modeling and architecture brings to project management. These emerging technologies have both great potential and challenges for improving information available for decision-making. The presentation covers standards, tools and cultural issues needing consideration, and includes lessons learned from projects the presenters have worked on.

  17. PROJECT - RESOURCE MANAGEMENT OF INNOVATIONS IN EDUCATION: ANTHROPOLOGICAL PROJECTION

    Directory of Open Access Journals (Sweden)

    Galina Aleksandrovna Ignat’eva

    2015-08-01

    Full Text Available The purpose of the research was to denote a way to solve the problem of education mana-gement ΄s insufficient efficiency considered from the point of view of education opportunities to influence on the formation of mechanisms for sustainable development of society as a whole and its educational component. The concept «project-resource management of innovation in education» regarded on the basis of the anthropological project-transforming paradigm. Conceptually-categorical context presented by conceptual cluster composed of coordinated concepts «project», «resource», «educational reality», «organizational-resource potential», «project commonality». In the theoretical part of the study on the basis of analysis of the normative and exploratory approaches to educational innovations organization and management it was established the search approach ΄s leading role in the methodological substantiation of project-resource management. The study have indicated that in the presence of variable models of innovation management in education, corresponding to various predictive models of continuing education post-industrial society, project-resource management is an universal mechanism for the transition from separate innovation΄s precedents to the an authentic reality of innovative education. In the technological part of the study the main concern was to submit the project-resource management by the management goal’s system, each of which includes the specific management actions, projected results and the organizational forms. The project-resource management ΄s professional – activity context of the study showed evolution of managerial positions: an effective performer – an effective leader – strategist, implemented during the transition from directly directive management to the project management and further to the project-resource management. Based on the findings identified the key factors of initiatively-problem projects

  18. Agile Project Management For Dummies

    CERN Document Server

    Layton, Mark C

    2012-01-01

    Be flexible and faster with Agile project management As mobile and web technologies continue to evolve rapidly, there is added pressure to develop and implement software projects in weeks instead of months. Agile Project Management For Dummies can make that happen. This is the first book to provide a simple, step-by-step guide to Agile Project Management approaches, tools, and techniques. With the fast pace of mobile and web technology development, software project development must keep pace; Agile Project Management enables developers to complete and implement projects more quickly and this b

  19. The relation between project management education and newer streams in project management research

    DEFF Research Database (Denmark)

    Leimbach, Timo; Goodall, Julie Bladt

    2017-01-01

    In the last decades, research in project management (PM) has experienced significant new inputs from a range of new PM methodologies and critical research streams. As a consequence, members of the more critical streams have called for the education of project managers to advance from that of trai......In the last decades, research in project management (PM) has experienced significant new inputs from a range of new PM methodologies and critical research streams. As a consequence, members of the more critical streams have called for the education of project managers to advance from...... that of training technicians, to fostering reflective practitioners that are better equipped to handle the increasing complexity of the profession. This paper is based on a recently commenced re-search project titled "Rethinking Project Management Education – the Role of Universities" that is aimed at analysing...... how the development of PM research is reflected in the education of project managers. On the basis of a short overview of the state of the art of PM education research and practices, the possible challenges for the development of PM education are discussed, and, finding that there is a lack...

  20. European research project 'Metrology for radioactive waste management'

    International Nuclear Information System (INIS)

    Suran, J.

    2014-01-01

    The three-year European research project M etrology for Radioactive Waste Management' was launched in October 2011 under the EMRP (European Metrology Research Programme). It involves 13 European national metrology institutes and a total budget exceeds four million Euros. The project is coordinated by the Czech Metrology Institute and is divided into five working groups. This poster presents impact, excellence, relevance to EMPR objectives, and implementation and management of this project.(author)

  1. Project management web tools at the MICE experiment

    International Nuclear Information System (INIS)

    Coney, L R; Tunnell, C D

    2012-01-01

    Project management tools like Trac are commonly used within the open-source community to coordinate projects. The Muon Ionization Cooling Experiment (MICE) uses the project management web application Redmine to host mice.rl.ac.uk. Many groups within the experiment have a Redmine project: analysis, computing and software (including offline, online, controls and monitoring, and database subgroups), executive board, and operations. All of these groups use the website to communicate, track effort, develop schedules, and maintain documentation. The issue tracker is a rich tool that is used to identify tasks and monitor progress within groups on timescales ranging from immediate and unexpected problems to milestones that cover the life of the experiment. It allows the prioritization of tasks according to time-sensitivity, while providing a searchable record of work that has been done. This record of work can be used to measure both individual and overall group activity, identify areas lacking sufficient personnel or effort, and as a measure of progress against the schedule. Given that MICE, like many particle physics experiments, is an international community, such a system is required to allow easy communication within a global collaboration. Unlike systems that are purely wiki-based, the structure of a project management tool like Redmine allows information to be maintained in a more structured and logical fashion.

  2. Project Management Plan to Maintain Safe and Compliant Conditions at the Plutonium Finishing Plant

    International Nuclear Information System (INIS)

    COX, G.J.

    1999-01-01

    This Project Management Plan presents the overall plan, description, mission, and workscope for the Plutonium Finishing Plant (PFP) maintain safe and compliant conditions project at PFP. This plan presents the overall description, mission, work scope, and planning for the Plutonium Finishing Plant (PFP) Maintain Safe and Compliant Conditions Project at PFP. This project includes all tasks required to maintain the safety boundary for the PFP Complex, except for the 2736-2 Vault Complex and the 234-52 vaults and vault-type rooms. The intent of this plan is to describe how this project will be managed and integrated with the stabilization, and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines that will manage the execution of this project. It describes the organizational approach and roles/responsibilities implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action

  3. The rationale for selecting the method of calculation of project products coast (works, services

    Directory of Open Access Journals (Sweden)

    O. V. Molchanova

    2017-01-01

    Full Text Available In modern conditions of management it is necessary to develop a number of recommendations on the introduction of management accounting at state-owned enterprises that carry out revenue-generating activities or based on the right of economic management. It is necessary to apply the correct cost-accounting method for the production of products, works, services for a more rational calculation of the cost price. This will allow management personnel to receive timely objective information about their cost price, identify the feasibility of production and sales, justify the assortment, plan profits. The procedure for determining the cost price of the project products (works, services in the theory and practice of the state enterprise of the Astrakhan region “Kasprybproekt” is investigated in the work. With the existing practice of planning in design organizations, the planned cost price of design and survey works for established cost items is planned in the cost estimate for production by the design organization as a whole and by the types of work: design, survey and others, without subdividing it by orders (projects. According to this, accounting of the actual costs for work in the design organizations is based. The study showed that the state enterprise of the Astrakhan region “Kasprybproyekt” performs different projects with different execution periods; therefore, it is advisable to use one method of calculating the cost price - job (order costing method, and link it to the responsibility centers depending on the department of the performer. Based on the research of the used method to the cost price calculate of the project products (works, services in the state enterprise of the Astrakhan region “Kasprybproekt”, it was proposed to use the job (order costing method that allows to detail all the project costs without distorting the final financial result and optimize the project costs. If the calculation method is correctly determined

  4. Project Management

    DEFF Research Database (Denmark)

    Kampf, Constance

    2009-01-01

    In this video Associate Professor Constance Kampf talks about the importance project management. Not only as a tool in implementation, but also as a way of thinking, and as something that needs to be considered from idea conception......In this video Associate Professor Constance Kampf talks about the importance project management. Not only as a tool in implementation, but also as a way of thinking, and as something that needs to be considered from idea conception...

  5. Distribution automation and control support; Analysis and interpretation of DAC working group results for use in project planning

    Science.gov (United States)

    Klock, P.; Evans, D.

    1979-01-01

    The Executive Summary and Proceedings of the Working Group Meeting was analyzed to identify specific projects appropriate for Distribution Automation and Control DAC RD&D. Specific projects that should be undertaken in the DAC RD&D program were recommended. The projects are presented under broad categories of work selected based on ESC's interpretation of the results of the Working Group Meeting. Some of the projects are noted as utility industry projects. The ESC recommendations regarding program management are presented. Utility versus Government management responsibilities are noted.

  6. Project Management Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1995-04-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S ampersand M) and as quickly and economically as possible. Implementation and completion of the deactivation project will further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S ampersand M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities, that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project

  7. Rethinking Project Management in Denmark

    DEFF Research Database (Denmark)

    Svejvig, Per

    2012-01-01

    . The chapter argues for a rethinking process due to pervasiveness and complexity in the contemporary project environment where rethinking is needed in order to stay competitive. The suggested approach for the rethinking project management is a framing process where body of ideas is established......Projects are everywhere across different sectors, industries and countries. Project management is no longer a sub-discipline of engineering and other rather technical disciplines but is also used for many other purposes. Even though practice has changed dramatically over the years, the models...... and methodologies for project management has been fairly static and has therefore received substantial criticism for a lack of relevance to practice. Several scholars have therefore started to think more widely about projects and project management conceptualized as rethinking project management. However this theme...

  8. Project Management Methodology in Human Resource Management

    Science.gov (United States)

    Josler, Cheryl; Burger, James

    2005-01-01

    When charged with overseeing a project, how can one ensure that the project will be completed on time, within budget, and to the satisfaction of everyone involved? In this article, the authors examine project management methodology as a means of ensuring that projects are conducted in a disciplined, well-managed and consistent manner that serves…

  9. Implementing Earned Value Management in the CxP EVA Systems Project Office

    Science.gov (United States)

    Sorge, Les L.

    2009-01-01

    Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

  10. Web Based Project Management System

    OpenAIRE

    Aadamsoo, Anne-Mai

    2010-01-01

    To increase an efficiency of a product, nowadays many web development companies are using different project management systems. A company may run a number of projects at a time, and requires input from a number of individuals, or teams for a multi level development plan, whereby a good project management system is needed. Project management systems represent a rapidly growing technology in IT industry. As the number of users, who utilize project management applications continues to grow, w...

  11. 1980 survey and evaluation of utility conservation, load management, and solar end-use projects. Volume 3: utility load management projects. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    The results of the 1980 survey of electric utility-sponsored energy conservation, load management, and end-use solar energy conversion projects are described. The work is an expansion of a previous survey and evaluation and has been jointly sponsored by EPRI and DOE through the Oak Ridge National Laboratory. There are three volumes and a summary document. Each volume presents the results of an extensive survey to determine electric utility involvement in customer-side projects related to the particular technology (i.e., conservation, solar, or load management), selected descriptions of utility projects and results, and first-level technical and economic evaluations.

  12. Data management for community research projects: A JGOFS case study

    Science.gov (United States)

    Lowry, Roy K.

    1992-01-01

    Since the mid 1980s, much of the marine science research effort in the United Kingdom has been focused into large scale collaborative projects involving public sector laboratories and university departments, termed Community Research Projects. Two of these, the Biogeochemical Ocean Flux Study (BOFS) and the North Sea Project incorporated large scale data collection to underpin multidisciplinary modeling efforts. The challenge of providing project data sets to support the science was met by a small team within the British Oceanographic Data Centre (BODC) operating as a topical data center. The role of the data center was to both work up the data from the ship's sensors and to combine these data with sample measurements into online databases. The working up of the data was achieved by a unique symbiosis between data center staff and project scientists. The project management, programming and data processing skills of the data center were combined with the oceanographic experience of the project communities to develop a system which has produced quality controlled, calibrated data sets from 49 research cruises in 3.5 years of operation. The data center resources required to achieve this were modest and far outweighed by the time liberated in the scientific community by the removal of the data processing burden. Two online project databases have been assembled containing a very high proportion of the data collected. As these are under the control of BODC their long term availability as part of the UK national data archive is assured. The success of the topical data center model for UK Community Research Project data management has been founded upon the strong working relationships forged between the data center and project scientists. These can only be established by frequent personal contact and hence the relatively small size of the UK has been a critical factor. However, projects covering a larger, even international scale could be successfully supported by a

  13. Project report - an overview of the project and experiences with project management

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Mikkelsen, Bent Egberg

    1996-01-01

    A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project.......A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project....

  14. Efficient and Effective Project Management

    Directory of Open Access Journals (Sweden)

    Dusan Pene

    2014-03-01

    Full Text Available The purpose of the article is to investigate different authorities and responsibilities of a project manager and of a project leader. Considering the fact that nowadays the project management is becoming the important factor in performing and leading the investments which are modified by modern leadership theories, we can say that the key element is the sovereign leadership of a manager and a project leader. The current multi-project environments and modern techniques at the project management area need the interdisciplinary leadership approach and at the same time they enable the strengthening of company’s competitive features so they are consistently satisfying high project expectations of the project investor or a client.

  15. Managing projects a team-based approach

    CERN Document Server

    Brown, Karen A

    2010-01-01

    Students today are likely to be assigned to project teams or to be project managers almost immediately in their first job. Managing Projects: A Team-Based Approach was written for a wide range of stakeholders, including project managers, project team members, support personnel, functional mangers who provide resources for projects, project customers (and customer representatives), project sponsors, project subcontractors, and anyone who plays a role in the project delivery process. The need for project management is on the rise as product life cycles compress, demand for IT systems increases, and business takes on an increasingly global character. This book adds to the project management knowledge base in a way that fills an unmet need—it shows how teams can apply many of the standard project management tools, as well as several tools that are relatively new to the field. Managing Projects: A Team-Based Approach offers the academic rigor found in most textbooks along with the practical attributes often foun...

  16. Multidisplinary Engineering, Project, and Production Management

    OpenAIRE

    Chien-Ho Ko

    2012-01-01

    Journal of Engineering, Project, and Production Management (EPPM-Journal) reflect the journal’s multidisciplinary approach to management research and can be categorized as belonging to three general topics: Project Management, Engineering and Project Management, and Project and Production Management.

  17. Evolution of project management research: a bibliometric study of International Journal of Project Management

    Directory of Open Access Journals (Sweden)

    Fábio Cocchi da Silva Eiras

    2017-03-01

    Full Text Available Over the past decades, the project management field has evolved and consolidated. Facing this growth, this research aims to identify the main trends of research in the area, as well as providing an overview of publications, identifying new issues, changes in approaches and the development of knowledge areas. To do so, a systematic review of the literature was performed with the use of bibliometric study in the papers of the International Journal of Project Management (IJPM, included in SCOPUS, from its first volume to 2015, covering a period of more than 30 years. It was found that developing countries are increasingly concerned in developing research into the field of project management, especially in mega infrastructure projects and public-private partnerships. The risk is a central topic in all periods of analysis, however, the strategic topics such as success in project and portfolio management are among the fastest growing. Issues related to the soft side of project management as skills, culture, and knowledge management have emerged in recent periods. According to the industry, construction projects and projects in information technology are the most studied along the period analysed.

  18. Project Work in Networked Distance Education

    DEFF Research Database (Denmark)

    Knudsen, Morten; Helbo, Jan; Jensen, Lars Peter

    2000-01-01

    -study, whereas the project study form is based on collaboration and dialogue. Consequently, successful implementation of project work in distance education requires extensive utilisation of new information and communication technology. In this paper the experiences of project work in a new Master of Industrial...... devoted to courses and the other half to project work. A computer conference system, LuvitÒ provides facilities for the courses, as well as structured synchronous and asynchronous communication. Eight times per year two-day seminars are held at the university for intensive lectures, project work......Problem oriented project work has been the foundation for the educational system at Aalborg University since its start 25 years ago. The duration of each student project is one semester, and the students spend half of their time working on the project in groups of typically 5-6 persons...

  19. Project management plan for the gunite and associated tanks treatability studies project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-12-01

    This plan for the Gunite and Associated Tanks (GAAT) Treatability Studies Project satisfies the requirements of the program management plan for the Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program as established in the Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program. This plan is a subtier of several other ER documents designed to satisfy the US Department of Energy (DOE) Order 4700.1 requirement for major systems acquisitions. This project management plan identifies the major activities of the GAAT Treatability Studies Project; establishes performance criteria; discusses the roles and responsibilities of the organizations that will perform the work; and summarizes the work breakdown structure, schedule, milestones, and cost estimate for the project

  20. Conceptualizing Knowledge Communication for Project Management

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    2015-01-01

    In the field of project management, the search for better ways to manage projects is ongoing. One of the more recent trends in the literature focuses on the integration of knowledge management in project management environments. Advantages of integrating knowledge management into projects can be ...... knowledge for project management, this paper focuses on extending Knowledge Management to include concepts related to communicating knowledge from the fields of rhetoric, knowledge communication, and corporate communication....

  1. From risk management to uncertainty management: a significant change in project management

    Institute of Scientific and Technical Information of China (English)

    LI Gui-jun; ZHANG Yue-song

    2006-01-01

    Starting with the meanings of the terms "risk" and "uncertainty,"" he paper compares uncertainty management with risk management in project management. We bring some doubt to the use of "risk" and "uncertainty" interchangeably in project management and deem their scope, methods, responses, monitoring and controlling should be different too. Illustrations are given covering terminology, description, and treatment from different perspectives of uncertainty management and risk management. Furthermore, the paper retains that project risk management (PRM) processes might be modified to facilitate an uncertainty management perspective,and we support that project uncertainty management (PUM) can enlarge its contribution to improving project management performance, which will result in a significant change in emphasis compared with most risk management.

  2. A visual representation system for the scheduling and management of projects

    NARCIS (Netherlands)

    Pollalis, S.N.

    1992-01-01

    A VISUAL SCHEDULING AND MANAGEMENT SYSTEM (VSMS) This work proposes a new system for the visual representation of projects that displays the quantities of work, resources and cost. This new system, called Visual Scheduling and Management System, has a built-in hierarchical system to provide

  3. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  4. Multidisplinary Engineering, Project, and Production Management

    Directory of Open Access Journals (Sweden)

    Chien-Ho Ko

    2012-01-01

    Full Text Available Journal of Engineering, Project, and Production Management (EPPM-Journal reflect the journal’s multidisciplinary approach to management research and can be categorized as belonging to three general topics: Project Management, Engineering and Project Management, and Project and Production Management.

  5. From Project Management to Process Management - Effectively Organising Transdisciplinary Projects

    OpenAIRE

    Moschitz, Heidrun

    2013-01-01

    In transdisciplinary projects, the roles of researchers change. In addition to being a source of knowledge, they are required to engage in knowledge exchange processes. This results in an alteration at project level: researchers need to creatively manage projects as group processes.

  6. Preliminary Study on Management of Agricultural Scientific Research Projects in the New Situation

    Institute of Scientific and Technical Information of China (English)

    Haiyan LUO; Qingqun YAO; Lizhen CHEN; Yu ZHENG

    2015-01-01

    Project management of agricultural scientific research institutions is an important section of agricultural scientific research plan management. It is of great significance for sustainable development of scientific research work of scientific research institutions. According to a series of opinions and notices about scientific and technological system reform issued by the state,and combining current situations of management of scientific research projects in scientific research institutions,this paper made a preliminary study on management of agricultural scientific research projects in the new trend. Finally,on the basis of the current situations of management of agricultural scientific research projects,it came up with pertinent recommendations,including strengthening communication and cooperation and actively declaring projects,strengthening preliminary planning of projects and establishing project information database,reinforcing project process management,ensuring on-time and high quality completion of projects,and strengthening learning and improving quality of management personnel.

  7. Technological Innovation Projects: Proposal For an Integrative Model Between Project Management and Knowledge Management in a Customer-Supplier Perspective

    Directory of Open Access Journals (Sweden)

    Edval da Silva Tavares

    2014-10-01

    Full Text Available In face of strong competition, companies in Brazil have increased their financial investments in automation, offering new products and services and reducing operating costs. These companies are focusing their efforts on core competencies and, therefore, they often lack the internal expertise to implement new projects, especially those that bring technological innovation. For this reason, we use the processes of outsourcing or subcontracting to help implement such projects. The unit of analysis in this study is the project and the object of the study to analyze the process of knowledge transfer from a provider to a customer during the duration of the project, which involves new technologies. The main motivation of this work is to address the acquisition and retention of new knowledge related to projects designed for business customers. We have developed a study of three cases of multiple financial firms that buy new technologies and two suppliers of information technology. As a practical result, a management model of knowledge transfer and retention of knowledge in client companies is proposed and incorporated into project management.

  8. Is project management the new management 2.0?

    Directory of Open Access Journals (Sweden)

    Steve A Leybourne

    2014-06-01

    Some theoretical frameworks are offered that assist in explaining the shift from the historically accepted ‘tools and techniques’ model to a more nuanced and behaviorally driven paradigm that is arguably more appropriate to manage change in today’s flexible and progressive organizations, and which provide a more coherent response, both in PM and traditional management, to McDonald’s forces. In addition, we offer a number of examples to robustly support our assertions, based around the development of innovative products from Apple Inc. In using this metaphor to demonstrate the evolution of project-based work, we link PM with innovation and new product development.

  9. Workload management in the EMI project

    International Nuclear Information System (INIS)

    Andreetto, Paolo; Bertocco, Sara; Dorigo, Alvise; Frizziero, Eric; Gianelle, Alessio; Sgaravatto, Massimo; Zangrando, Luigi; Capannini, Fabio; Cecchi, Marco; Mezzadri, Massimo; Prelz, Francesco; Rebatto, David; Monforte, Salvatore; Kretsis, Aristotelis

    2012-01-01

    The EU-funded project EMI, now at its second year, aims at providing a unified, high quality middleware distribution for e-Science communities. Several aspects about workload management over diverse distributed computing environments are being challenged by the EMI roadmap: enabling seamless access to both HTC and HPC computing services, implementing a commonly agreed framework for the execution of parallel computations and supporting interoperability models between Grids and Clouds. Besides, a rigourous requirements collection process, involving the WLCG and various NGIs across Europe, assures that the EMI stack is always committed to serving actual needs. With this background, the gLite Workload Management System (WMS), the meta-scheduler service delivered by EMI, is augmenting its functionality and scheduling models according to the aforementioned project roadmap and the numerous requirements collected over the first project year. This paper is about present and future work of the EMI WMS, reporting on design changes, implementation choices and longterm vision.

  10. 7 CFR 3565.351 - Project management.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  11. Adapting Project Management Practices to Research-Based Projects

    Science.gov (United States)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  12. IT Project Management Metrics

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available Many software and IT projects fail in completing theirs objectives because different causes of which the management of the projects has a high weight. In order to have successfully projects, lessons learned have to be used, historical data to be collected and metrics and indicators have to be computed and used to compare them with past projects and avoid failure to happen. This paper presents some metrics that can be used for the IT project management.

  13. Project management v praxi

    OpenAIRE

    Králová, Eliška

    2013-01-01

    Project management approaches are commonly used to write and implement business plans. In this thesis standard project management tools and methods are applied to a real project, which aims to improve the properties of the product it offers (an online educational game). This project is unique in that it is based on a voluntary basis, has limited resources and is very responsive to market demands. Project management is broken down into four stages according to the project life cycle: initiatio...

  14. New challenges for Life Sciences flight project management

    Science.gov (United States)

    Huntoon, C. L.

    1999-01-01

    Scientists have conducted studies involving human spaceflight crews for over three decades. These studies have progressed from simple observations before and after each flight to sophisticated experiments during flights of several weeks up to several months. The findings from these experiments are available in the scientific literature. Management of these flight experiments has grown into a system fashioned from the Apollo Program style, focusing on budgeting, scheduling and allocation of human and material resources. While these areas remain important to the future, the International Space Station (ISS) requires that the Life Sciences spaceflight experiments expand the existing project management methodology. The use of telescience with state-the-art information technology and the multi-national crews and investigators challenges the former management processes. Actually conducting experiments on board the ISS will be an enormous undertaking and International Agreements and Working Groups will be essential in giving guidance to the flight project management Teams forged in this matrix environment must be competent to make decisions and qualified to work with the array of engineers, scientists, and the spaceflight crews. In order to undertake this complex task, data systems not previously used for these purposes must be adapted so that the investigators and the project management personnel can all share in important information as soon as it is available. The utilization of telescience and distributed experiment operations will allow the investigator to remain involved in their experiment as well as to understand the numerous issues faced by other elements of the program The complexity in formation and management of project teams will be a new kind of challenge for international science programs. Meeting that challenge is essential to assure success of the International Space Station as a laboratory in space.

  15. Measurement of software project management effectiveness

    OpenAIRE

    Demir, Kadir Alpaslan

    2008-01-01

    Approved for public release; distribution is unlimited. Evaluating, monitoring, and improving the effectiveness of project management can contribute to successful acquisition of software systems. In this dissertation, we introduce a quantitative metric for gauging the effectiveness of managing a software-development project. The metric may be used to evaluate and monitor project management effectiveness in software projects by project managers, technical managers, executive man...

  16. How the Lean Management System is Working on a Closure Project - 13242

    Energy Technology Data Exchange (ETDEWEB)

    Mowery, Carol [Washington Closure Hanford, 2620 Fermi, Richland, Washington, 99354 (United States)

    2013-07-01

    Washington Closure Hanford, LLC (WCH) manages the River Corridor Closure Project (RCCP), a 10-year contract, in which WCH will clean up 220 mi{sup 2} of contaminated land at the Hanford Site in Richland, Washington. Strategic planning sessions in 2009 identified key performance areas that were essential to closure and in which focused change could result in dramatic performance improvement. Lean Management Systems (Lean) was selected as the methodology to achieve the desired results. The Lean Process is built upon the fundamentals of the power of respect for people and the practice of continuous process improvement. Lean uses week-long, focused sessions that teach a selected team the techniques to recognize waste within their own work processes, propose potential solutions, and then conduct experiments during the week to test their solutions. In 2011, the Lean process was implemented in the Waste Operations organization. From there it was expanded to closure documents, field remediation, and decommissioning and demolition. WCH identified the following Lean focus areas: 1) closure document processes that required extensive internal preparation, and lengthy external review and approval cycles; 2) allocation of limited transportation and waste disposal resources to meet aggressive remediation schedules; 3) effective start-of-the-day routines in field operations; 4) improved excavation and load-out processes; and 5) approaches to strengthen safety culture and support disciplined operations. Since the introduction of Lean, RCCP has realized many successes and also gained some unexpected benefits. (authors)

  17. How the Lean Management System is Working on a Closure Project - 13242

    International Nuclear Information System (INIS)

    Mowery, Carol

    2013-01-01

    Washington Closure Hanford, LLC (WCH) manages the River Corridor Closure Project (RCCP), a 10-year contract, in which WCH will clean up 220 mi 2 of contaminated land at the Hanford Site in Richland, Washington. Strategic planning sessions in 2009 identified key performance areas that were essential to closure and in which focused change could result in dramatic performance improvement. Lean Management Systems (Lean) was selected as the methodology to achieve the desired results. The Lean Process is built upon the fundamentals of the power of respect for people and the practice of continuous process improvement. Lean uses week-long, focused sessions that teach a selected team the techniques to recognize waste within their own work processes, propose potential solutions, and then conduct experiments during the week to test their solutions. In 2011, the Lean process was implemented in the Waste Operations organization. From there it was expanded to closure documents, field remediation, and decommissioning and demolition. WCH identified the following Lean focus areas: 1) closure document processes that required extensive internal preparation, and lengthy external review and approval cycles; 2) allocation of limited transportation and waste disposal resources to meet aggressive remediation schedules; 3) effective start-of-the-day routines in field operations; 4) improved excavation and load-out processes; and 5) approaches to strengthen safety culture and support disciplined operations. Since the introduction of Lean, RCCP has realized many successes and also gained some unexpected benefits. (authors)

  18. MANAGING MULTICULTURAL PROJECT TEAMS

    Directory of Open Access Journals (Sweden)

    Cezar SCARLAT

    2014-06-01

    Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.

  19. Project Management in Public Administration. TPM – Total Project Management Maturity Model. The Case of Slovenian Public Administration

    Directory of Open Access Journals (Sweden)

    Gordana ŽURGA

    2018-02-01

    Full Text Available The purpose of the article is to present the importance of project management for the functioning of public administration, and its contribution to the realization of the developmental goals of the government. For this, integration of strategic management and project management is of vital importance. The methodology used is a combination of literature review, a case study of project management in public administration of the Republic of Slovenia, and development of a maturity model of project management in public administration, with its verifi cation on the case of Slovenia. The main contribution of the study is development of TPM – Total Project Management maturity model for public administration. Upon the TPM maturity model, project management in Slovene public administration is assessed and discussed. Out of fi ve maturity levels, the results for project management in Slovene public administration are: management of projects – level 2 (initiated, management of programs of projects – level 2 (initiated, management of portfolios of projects – level 3 (implemented, organizational support for project management – level 3 (implemented, HRM for project management – level 2 (initiated, and integration of project management and strategic management – level 3 (implemented. General fi ndings and recommendations in this respect are drawn, together with indicated areas for possible further research and investigation.

  20. Nuclear power. Volume 2. Nuclear power project management

    International Nuclear Information System (INIS)

    Pedersen, E.S.

    1978-01-01

    NUCLEAR POWER PLANT DESIGN is intended to be used as a working reference book for management, engineers and designers, and as a graduate-level text for engineering students. The book is designed to combine theory with practical nuclear power engineering and design experience, and to give the reader an up-to-date view of the status of nuclear power and a basic understanding of how nuclear power plants function. Volume 2 contains the following chapters: (1) review of nuclear power plants; (2) licensing procedures; (3) safety analysis; (4) project professional services; (5) quality assurance and project organization; (6) construction, scheduling, and operation; (7) nuclear fuel handling and fuel management; (8) plant cost management; and (9) conclusion

  1. Project management: importance for diagnostic laboratories.

    Science.gov (United States)

    Croxatto, A; Greub, G

    2017-07-01

    The need for diagnostic laboratories to improve both quality and productivity alongside personnel shortages incite laboratory managers to constantly optimize laboratory workflows, organization, and technology. These continuous modifications of the laboratories should be conducted using efficient project and change management approaches to maximize the opportunities for successful completion of the project. This review aims at presenting a general overview of project management with an emphasis on selected critical aspects. Conventional project management tools and models, such as HERMES, described in the literature, associated personal experience, and educational courses on management have been used to illustrate this review. This review presents general guidelines of project management and highlights their importance for microbiology diagnostic laboratories. As an example, some critical aspects of project management will be illustrated with a project of automation, as experienced at the laboratories of bacteriology and hygiene of the University Hospital of Lausanne. It is important to define clearly beforehand the objective of a project, its perimeter, its costs, and its time frame including precise duration estimates of each step. Then, a project management plan including explanations and descriptions on how to manage, execute, and control the project is necessary to continuously monitor the progression of a project to achieve its defined goals. Moreover, a thorough risk analysis with contingency and mitigation measures should be performed at each phase of a project to minimize the impact of project failures. The increasing complexities of modern laboratories mean clinical microbiologists must use several management tools including project and change management to improve the outcome of major projects and activities. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  2. THE PROACTIVE MANAGEMENT MODEL OF STRATEGIC DEVELOPMENT PROJECT ON THE ENERGY SUPPLY COMPANIES IN A TURBULENT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    Михайло Збишекович ДОМБРОВСЬКИЙ

    2017-03-01

    Full Text Available A methodical approach of proactive project management model with the estimate (prediction deviation of actual results from planned at each control step is proposed. Deviation of actual results from the project planned, which takes place in the management of the energy company transformation project, as a result of action under uncertainty, determines the acceleration of work over the project plan. Implementation the scope of work, which exceeds the plan, as result of overspending of resources and budget, disrupting the stability of the project as a system. The graphic model helps to form the "corridor" tolerance based resource reserve, and the implementation of the project work is carried out according to the extension concept. Clarification allowable deviation area allows improving the model of project proactive management for each of the next execution step. Project management quality is improved by reducing the time of decision-making and increase the sustainability and efficiency by substantially reducing deviations. The conclusions about the benefits of the assessment of works and project resources balance, by using the proactive management model, which allows comparing variants of works dynamics, to implement the search for the best solution to a predetermined set of admissible, have been made.

  3. Adoption of Building Information Modelling in project planning risk management

    Science.gov (United States)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  4. Non-Profit/Higher Education Project Management Series: Project Management (PM) Foundations

    Science.gov (United States)

    Burgher, Karl E.; Snyder, Michael B.

    2012-01-01

    This is the first in a series of forum articles on applying project management (PM) techniques and tools to the nonprofit sector with a focus on higher education. The authors will begin with a traditional look at project management because they believe that the integration of the tools and the processes associated with PM into many campus offices…

  5. Comprehensive management of project changes

    Directory of Open Access Journals (Sweden)

    Aljaž Stare

    2010-06-01

    Full Text Available The goal of this research was to examine how project changes can be prevented, and how to reduce their negative impact. Theoretical research examined risk management, project control and change management. Based on the study a “Comprehensive Change Management Model” was developed and verified after conducting empirical research in Slovenian enterprises. The research confirmed that risk management identifies possible changes and reduces their impact; project control ensures the timely detection of changes and an efficient response, while formal change management ensures the effective implementation of changes. The combined functioning of all three areas ensures effective project execution.

  6. MORE: Management of Requirements in NPP Modernisation Projects, final report

    International Nuclear Information System (INIS)

    Fredriksen, R.; Katta, V.; Raspotnig, C.; Valkonen, J.

    2008-09-01

    This report documents the work and related activities of the MORE (Management of Requirements in NPP Modernisation Projects) (NKS-R project number NKS-R-2005-47) project. This report also provides a summary of the project activities and deliverables, and discusses possible application areas. The project has aimed at the industrial utilisation of the results from the TACO: (Traceability and Communication of Requirements in Digital I and C Systems Development) (NKS-R project number NKS-R-2002-16, completed June, 2005) project, and practical application of improved approaches and methods for requirements engineering and change management. Finally, the report provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (au)

  7. MORE: Management of Requirements in NPP Modernisation Projects, final report

    Energy Technology Data Exchange (ETDEWEB)

    Fredriksen, R.; Katta, V.; Raspotnig, C. (Inst. for energiteknikk (IFE) (Norway)); Valkonen, J. (Technical Research Centre of Finland (VTT) (Finland))

    2008-09-15

    This report documents the work and related activities of the MORE (Management of Requirements in NPP Modernisation Projects) (NKS-R project number NKS-R-2005-47) project. This report also provides a summary of the project activities and deliverables, and discusses possible application areas. The project has aimed at the industrial utilisation of the results from the TACO: (Traceability and Communication of Requirements in Digital I and C Systems Development) (NKS-R project number NKS-R-2002-16, completed June, 2005) project, and practical application of improved approaches and methods for requirements engineering and change management. Finally, the report provides a brief description of the extended industrial network and disseminations of the results in Nordic and NKS related events such as seminars and workshops. (author)

  8. Project management for profit a failsafe guide to keeping projects on track and on budget

    CERN Document Server

    Knight, Joe; Angus, Brad; Case, John

    2012-01-01

    If your work involves projects, then this book is for you. It will show every company owner and project manager—at businesses large and small—how to run projects differently. You’ll benefit if you’ve ever: • been over budget on a project • exceeded a timeline on a projectworked on a project that completely stalled as you neared the finish line • lost money on a sure-thing project and had no idea why • noticed that scope and feature creep held you back • watched a project take three times as long as planned • felt too embarrassed to perform a review of your successes and failures • wondered whether your project actually made any money By the time you finish the book, you’ll be ready to implement Project Management for Profit in your own company—and be prepared to keep your projects on track and on budget.

  9. Process-based software project management

    CERN Document Server

    Goodman, F Alan

    2006-01-01

    Not connecting software project management (SPM) to actual, real-world development processes can lead to a complete divorcing of SPM to software engineering that can undermine any successful software project. By explaining how a layered process architectural model improves operational efficiency, Process-Based Software Project Management outlines a new method that is more effective than the traditional method when dealing with SPM. With a clear and easy-to-read approach, the book discusses the benefits of an integrated project management-process management connection. The described tight coup

  10. Effective utilization of maintenance staff in design and implementation of major project work

    International Nuclear Information System (INIS)

    Wyman, D.; Dingle, J.; Brown, R.

    1995-01-01

    The reorganization of Pickering Nuclear Division some 2 years ago resulted in the formation of the Projects and Modifications department. This department takes an integrated approach to manage all aspects of large projects at Pickering. The integration of Design, Drafting, Procurement, Construction and Operations functions into project teams represents a fundamental change to project management at Pickering. The development of integrated teams has great potential for reducing both the time and cost associated with project implementation, while at the same time improving the quality, and maintainability of the commissioned in service project. The Pickering Rehab organization 1989-1993, established to perform the rehab / retube of Units 3 and 4 had proven that a team environment will produce effective results. The outcome was astounding, critical categories such as Safety, Quality of Work, and Timeliness, had proven the team's effectiveness. The integration of operations maintenance staff into the project work activities is still evolving, and has probably required the most adaptation to change for both the former Construction and Operations organizations. Maximizing the utilization of the maintenance staff in the design and implementation of major project work will prove to be a key to a long term operating success of these projects. This paper will focus in on the effective usage of Maintenance staff in the design and implementation phases of major project work at Pickering, and on the benefits realized using this approach. It will be divided into 5 sections as indicated. 1. Past Project Shortfalls. 2. Benefits of the inclusion of Maintenance staff in the Calandria Vault Rehab Project. 3. Maintenance involvement in the Pickering 'A' Shutdown System Enhancement (SDSE) Project. 4. Challenges resulting from the inclusion of Maintenance staff project teams. 5. Summary. (author)

  11. Managing IT Projects in Public Companies: A Case Study

    Directory of Open Access Journals (Sweden)

    Bouras, A.

    2014-07-01

    Full Text Available As part of its public sector modernization effort, a North African government has put a lot of effort and allocated significant budgets since 1997 to modernize one of its main public sector companies. Consequently, this company, that mainly offers postal services, initiated many IT-based projects to computerize all paper-based ongoing services offered through its branches and to present new products to customers. This company was aiming to improve service quality and to diversify the range of its services. However, some of these IT-based projects inevitably faced problems. Some projects were either not completed successfully, cancelled, over-budget or taking more time than scheduled. As a result, many employees and customers of this company were dissatisfied and complained about bad planning, slowness and significant disruptions in these projects, an event that affected adversely the quality of service. This study aims at determining the causes of these project disruptions, failures or delays. To achieve this aim, 30 experienced project developers and engineers working in that company’s IT department volunteered to respond to a detailed questionnaire specifically developed for this purpose. The questionnaire included questions about project vision clarity, time/cost management, project quality assurance, risk management and human resources management. Results show that the main reasons for disruptions, failure or delays in IT projects are lack of business plan and poor documentation during and after finishing projects, lack of clear quality assurance criteria, standards and reviews, and poor project risk management practices. Ramifications of such results in terms of improving IT project management practices in the public service sector are finally presented.

  12. Project Management with IT Security Focus

    OpenAIRE

    Felician Alecu; Paul Pocatilu; Sergiu Capisizu

    2011-01-01

    The paper focus on the main key points related to the IT security project management. The most important lifecycle stages are identified: IT security project proposal definition, project organization, project planning, quality planning, project team organization, IT security project activities management and project closing. The most important success factors for IT security projects are the support of top-management, customer satisfaction, prevention over remediation and continuous progress....

  13. PROJECT MANAGEMENT OFFICE – LINK BETWEEN ORGANIZATIONAL STRATEGIC AND OPERATIONAL: A CASE STUDY

    Directory of Open Access Journals (Sweden)

    Mario Manzini Cianfanelli

    2014-12-01

    Full Text Available The objective of this work is to demonstrate the organizational integration achieved through the implementation of a project management office (PMO, created to combat the loss of water distribution in one of the business units of Basic Sanitation Company of the State of São Paulo – Sabesp. The methodology used to achieve this goal was the study of a single case in which the information was obtained through documentary research and semi-structured interviews. The results showed how this integration was achieved with the adoption of a standard methodology in project management, control based on information technology and the spread of the organization's strategy in the sectors below. This work concluded that with this implantation of the project management office it was possible to improve the planning and the control of the activities of the projects through a pattern methodology in managing projects that gave possibilities to create a new culture focusing in solving problems.

  14. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  15. The analysis of MS Project Server platform for managing of human resources in multiproject environment

    OpenAIRE

    Kadunc, Boštjan

    2009-01-01

    Effective project management requires qualified project managers, who must have complete control over their projects, so they can perform fluently. For easier and more effective project management, we can use various software solutions. In my graduation thesis I focused on working with resources - detecting and resolving their over-allocation. For their regulation I have used Microsoft Office Project Professional 2007 in connection with Microsoft Office Project Server 2007. My goal wa...

  16. Remedial Action and Waste Disposal Project Manager's Implementing Instructions

    International Nuclear Information System (INIS)

    Dronen, V.R.

    1998-01-01

    These Project Manager's Implementing Instructions provide the performance standards required of all Environmental Restoration Contractor personnel in their work during operation and administration of the Remedial Action and Waste Disposal Project. The instructions emphasize technical competency, workplace discipline, and personal accountability to ensure a high level of safety and performance during operations activities

  17. Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

    Science.gov (United States)

    Kennedy, Kriss J.; Toup, Larry; Gill, Tracy; Tri, Terry; Howe, Scott; Smitherman, David

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project

  18. Project Portfolio Management Applications Testing

    OpenAIRE

    Paul POCATILU

    2006-01-01

    Many IT companies are running project simultaneously. In order to achieve the best results, they have to group to the project in portfolios, and to use specific software that helps to manage them. Project portfolio management applications have a high degree of complexity and they are very important for the companies that are using it. This paper focuses on some characteristics of the testing process for project portfolio management applications

  19. Project risk management: A review of an institutional project life cycle

    Directory of Open Access Journals (Sweden)

    Wanjiru Gachie

    2017-11-01

    Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects

  20. Culture and conflict management style of international project managers

    OpenAIRE

    Mohammed, U. K.; Prabhakar, G. P.; White, G.

    2008-01-01

    The management of culture has become increasingly important to many organisations and business disciplines, particularly multicultural and international project management. Cultural differences often result in varying degrees of conflict and require careful consideration. This study surveys 116 Project Managers using the Thomas-Kilmann Conflict Mode Instrument to determine their approach toward managing conflict. Indian, French and UK Project Managers’ conflict management style are correlated...

  1. Managing Projects with KPRO

    Science.gov (United States)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  2. MATURITY IN PROJECT MANAGEMENT: A STUDY OF EXISTING PRACTICES IN GOVERNMENT BODIES PERNAMBUCO

    Directory of Open Access Journals (Sweden)

    Antonio de Souza Silva Júnior

    2012-11-01

    Full Text Available Targets able to conquer the organization's business strategy give rise to projects that run the organization. And success in managing these projects is related to the skill level of the organization to manage them. With this, organizations need mature in the science and art of project management. This article is a case of study which seeks to identify the level of maturity and the management practices of public institutions in Pernambuco State. Therefore we conducted a quantitative survey to assess the level 2 of the Project Management Maturity Model, proposed by Kerzner (2006, and qualitative research in order to identify the management practices of the projects in the state. It can be concluded that public agencies in the State of Pernambuco did not reach the level 2 (common procedure of maturity in project management. The structured project management approach is not widely used yet. In many projects, the management is done empirically, with little interaction between the stakeholders, with no training for team work and proper risks treatment.

  3. 44 CFR 206.438 - Project management.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for project...

  4. PROJECT MANAGEMENT FOR THE STATE-GOVERNED GEOLOGICAL EXPLORATION OF MINERAL RESOURCES

    Directory of Open Access Journals (Sweden)

    A. M. Lygin

    2018-03-01

    Full Text Available The relevance of the research. Creating high-efficient and innovation-oriented system of studying the subsoil and the mineral resource base is one of the priority areas of developing the geological sphere. The purpose of the present study is to substantiate the rationale for the adoption of the project management methods for the exploration work. Research methods: method of system analysis, method of comparison and analogies, and method of scientific generalization. The results and their application. This article deals with the content of the main standard legislative documents which determine the strategy and lines of the country’s geological sector development in the nearest future. The article discloses the purposes and their strategic objectives and the content of the state program of the Russian Federation called “Reproduction and use of natural resources”. The resource support of the program and its subroutines is also revealed. The structure of geological industry management in modern conditions is presented. The main activities for restructuring of the geological industry are set out. They include the following points. The transformation of the Federal state unitary enterprises of information and expert profile, the advancement of scientific organizations engaged in scientific and analytical support of performed public functions. These functions are concerned with the geological study of subsoil and reproduction of the mineral resource base, as well as improving its management. The consolidation of specialized geological organizations on the types of exploration and mining, and also the main results of reorganization of the enterprises is taken into account. All of the aforementioned is subordinated to and is conducted by the Federal Agency for subsoil management. The shortcomings of the current system of management of works on the state geological study of the subsoil were revealed at the expense of the Federal budget. The

  5. Project management and performance management: potential transdisciplinary contributions

    Directory of Open Access Journals (Sweden)

    Gerrit van der Waldt

    2012-12-01

    Full Text Available As project management and performance management as management applications gain momentum in public sector settings, the question often arise as to if, how, and when these applications should complement each other in various policy implementation and service delivery initiatives. Answers to this question should be sought from various vantage points or perspectives. These vantage points may range from macro, meso, micro as well as theoretical-methodological perspectives. The purpose of this paper is to unlock the potential for transdisciplinary contributions between Project Management and Performance Management by focusing on the methodologies, functional areas, and practical applications of both management disciplines. It is argued that the respective methodologies and their processes should be unpacked to identify the timing or moment when each discipline could, and should, make a contribution to the success of the other. This will add value to the theoretical underpinnings and practical applications of both study domains in the public sector. The respective contributions are illustrated by means of application realities of both management practices in the South African Public Service. Keywords: project management, performance management, Public Sector applications, transdisciplinarity Disciplines: project management, performance management

  6. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.L.

    2000-01-10

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels.

  7. Integrated Environment and Safety and Health Management System (ISMS) Implementation Project Plan

    International Nuclear Information System (INIS)

    MITCHELL, R.L.

    2000-01-01

    The Integrated Environment, Safety and Health Management System (ISMS) Implementation Project Plan serves as the project document to guide the Fluor Hanford, Inc (FHI) and Major Subcontractor (MSC) participants through the steps necessary to complete the integration of environment, safety, and health into management and work practices at all levels

  8. Project Portfolio Management Applications Testing

    Directory of Open Access Journals (Sweden)

    Paul POCATILU

    2006-01-01

    Full Text Available Many IT companies are running project simultaneously. In order to achieve the best results, they have to group to the project in portfolios, and to use specific software that helps to manage them. Project portfolio management applications have a high degree of complexity and they are very important for the companies that are using it. This paper focuses on some characteristics of the testing process for project portfolio management applications

  9. Design interface management system for nuclear power plant project

    International Nuclear Information System (INIS)

    Wang Jun

    2012-01-01

    Design interfaces exist between different participants and during the whole course of a nuclear power project, and include different disciplinary requirements. The purpose of interface management is to establish a procedure, which can be efficiently used to control the complex design interfaces and ensure its compliance with NPP design requirements. To this end, a complete work procedures and relationship will be defined and classified, so as to set up the structure of interface management system. The system consists of three levels, i.e. working procedure level, management tool level and technical document level. Two management routes, i.e. administration route and technical route, are adopted so as to conduct management efficiently. (author)

  10. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  11. The future of the Canadian oil sands: Engineering and project management advances

    Energy Technology Data Exchange (ETDEWEB)

    Madden, Peter; Morawski, Jacek

    2010-09-15

    Production technology and project management developments in Canada's oil sands industry, in the context of AMEC's experience as EPCM service provider, are discussed. Effective project management systems and workfront planning are critical to achieve cost and schedule targets and optimum construction execution. Construction Work Packages divide work into discrete pieces and Construction Work Execution Plans influence scheduling of engineering and procurement deliverables. AMEC's Engineering Data Warehouse works with intelligent engineering design tools to ensure information related to a piece of equipment is consistent across all systems. HSSE systems are proactively developed and AMEC's progressive improvement in safety performance is demonstrated.

  12. Project Management Plan Solution Stabilization

    International Nuclear Information System (INIS)

    SATO, P.K.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process

  13. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  14. Management Guidelines for Database Developers' Teams in Software Development Projects

    Science.gov (United States)

    Rusu, Lazar; Lin, Yifeng; Hodosi, Georg

    Worldwide job market for database developers (DBDs) is continually increasing in last several years. In some companies, DBDs are organized as a special team (DBDs team) to support other projects and roles. As a new role, the DBDs team is facing a major problem that there are not any management guidelines for them. The team manager does not know which kinds of tasks should be assigned to this team and what practices should be used during DBDs work. Therefore in this paper we have developed a set of management guidelines, which includes 8 fundamental tasks and 17 practices from software development process, by using two methodologies Capability Maturity Model (CMM) and agile software development in particular Scrum in order to improve the DBDs team work. Moreover the management guidelines developed here has been complemented with practices from authors' experience in this area and has been evaluated in the case of a software company. The management guidelines for DBD teams presented in this paper could be very usefully for other companies too that are using a DBDs team and could contribute towards an increase of the efficiency of these teams in their work on software development projects.

  15. Reflective questioning in management education : lessons from supervising thesis projects

    NARCIS (Netherlands)

    Seggelen-Damen, van I.C.M.; Romme, A.G.L.

    2014-01-01

    Reflective questioning is a critical activity in management learning and education. This article describes research on the nature of reflective questioning in groups of management students working on final MSc projects. Drawing on content analysis of recorded meetings, we identify the following key

  16. SAT project introduction: management issues

    International Nuclear Information System (INIS)

    Kazennov, A.Yu.

    1998-01-01

    Management issues of introducing SAT Project include main objectives and expectations; SAT goal and management; major phases of SAT implementation; project quality assurance; SAT based training system and procedures; role of the project team qualifications

  17. Project Portfolio Management for Academic Libraries: A Gentle Introduction

    Science.gov (United States)

    Vinopal, Jennifer

    2012-01-01

    In highly dynamic, service-oriented environments like academic libraries, much staff time is spent on initiatives to implement new products and services to meet users' evolving needs. Yet even in an environment where a sound project management process is applied, if we're not properly planning, managing, and controlling the organization's work in…

  18. Improving Project Portfolio Management (PPM) for Improvement Projects

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Jakobsen, Peter M.; Korsaa, Morten

    2017-01-01

    Project Portfolio Management (PPM) focus on the integration and alignment of projects with the business operation in order to achieve most value and cost-efficiency for the investment in projects. PPM is often a challenge and especially so for improvement projects where PPM is considerably...... of evaluating a portfolio of improvement projects and combine this evaluation with the effect they have on the CMMI maturity level. Further, the paper demonstrates how the combination of a strong senior management requirement for improved maturity and the focus on getting the most value out of PPM made...

  19. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management To Safely And Effectively Complete Nuclear Construction Work

    International Nuclear Information System (INIS)

    Leso, K.F.; Hamilton, H.M.; Farner, M.; Heath, T.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  20. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    Energy Technology Data Exchange (ETDEWEB)

    LESO KF; HAMILTON HM; FARNER M; HEATH T

    2010-01-14

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  1. Academic Librarians at Institutions with LIS Programs Assert that Project Management Training is Valuable

    Directory of Open Access Journals (Sweden)

    Elaine Sullo

    2017-09-01

    Full Text Available A Review of: Serrano, S. C. & Avilés, R. A. (2016. Academic librarians and project management: An international study. portal: Libraries and the Academy, 16(3, 465-475. http://dx.doi.org/10.1353/pla.2016.0038 Abstract Objective – To investigate academic librarians’ project management education and training, project management skills and experiences, and perceptions of project management courses within the library and information science (LIS curriculum. Design – Online questionnaire. Setting – 70 universities worldwide with LIS programs and at least one project management course. Subjects – 4,979 academic librarians were invited to complete the online questionnaire; 649 librarians participated. Methods – From the identified institutions, the authors invited academic librarians to participate in a 17-question survey via e-mail. The survey was available in both English and Spanish and was validated via a pilot trial. A total of 649 individuals participated, for a response rate of 13%. The survey included questions related to geographic region and institution affiliation, university education and librarian training associated with project management, project participation and use of project management software or methods, and project management courses in LIS curriculums, and a final open-ended comment section. Main Results – Of the 649 librarians who participated in the survey, 372 were from North and South America (58%. The next highest number of responses came from Europe (38%, followed by low response rates from Africa, Asia, and Oceania. Respondents reported working in a variety of library departments and identified themselves as being one of a director or manager, assistant librarian, or library page. Of the 436 respondents who reported having a university degree, 215 attended an LIS Master’s level program, and 12 studied at the doctoral level. The majority of respondents indicated they have had training in project management

  2. Compilation Of An Econometric Human Resource Efficiency Model For Project Management Best Practices

    OpenAIRE

    G. van Zyl; P. Venier

    2006-01-01

    The aim of the paper is to introduce a human resource efficiency model in order to rank the most important human resource driving forces for project management best practices. The results of the model will demonstrate how the human resource component of project management acts as the primary function to enhance organizational performance, codified through improved logical end-state programmes, work ethics and process contributions. Given the hypothesis that project management best practices i...

  3. Risk Management in Construction Project: Taking Fairness into Account

    Science.gov (United States)

    Górecki, Jarosław; Bizon-Górecka, Jadwiga

    2017-10-01

    Risk management requires a comprehensive review of possible hazards, their possible outcomes as well as some recommendations about minimizing the risk. The study emphasises that the project risk management refers to an analysis of the risk factors and a creation of the strategy minimising negative effects of the risk. It was pointed out that a construction project is this kind of projects that can be defined as a unique process of high complexity (design documentation, various stages of creating the building), which has clearly defined time frames and a given financial limit. It is executed as a team work, by qualified or highly qualified specialists of different matters, for example masonry, precast, etc. Additionally, it requires a use of modern equipment and an adequate preparation of the investment. Therefore, the risk management focuses on the problems allowing for troubleshooting. A basis of the risk management is to recognise the fundamentals, which are crucial for the construction project management, i.e. an object perspective, including technological, supporting and management processes as well as an entity perspective - project stakeholders. Construction projects require also an acquaintance with the specificity of the branch. The article refers to the risk management in construction project and, in particular, a phenomenon of participants’ fairness in such projects. The problem of fairness of the entities involved in a project should be understood as a fair play, according to the arrangements agreed in a contract and compatible with current formal procedures and social rules. It was indicated that fairness can be treated as an important factor in predicting the success of such projects. Interviews conducted among contractors in Kuyavian-Pomeranian region showed varied fairness requirements put to individual participants of construction projects. The article presents results of the research. It shows a desired attitude of the surveyed enterprises

  4. PROJECT MANAGEMENT CONSIDERED IN A 2014 PERSPECTIVE

    Directory of Open Access Journals (Sweden)

    GRAPĂ ADELINA-ROXANA

    2014-05-01

    Full Text Available Project Management has come of age, yet multiple surveys and reports confirm the fact that the majority of projects are challenged. Given the more demanding and strict financial constraints associated with the current fiscal climate, project management is regarded as a tool that can deliver more with less. The literature on Project Management shows that, in spite of advancement in Project Management processes, tools and systems, project success has not significantly improved. This problem raises questions about the value and effectiveness of Project Management and Project Management systems. Programs and projects are considered as strategic assets for the majority of businesses, therefore, the trend of these organizations is to embrace a management by projects culture. The main objective of Project Management nowadays is to ensure programs and projects aligned to a certain strategy and also to provide for every member of an organization the ability to take proactive actions creating additional benefits.

  5. Agile Project Management for e-Learning Developments

    Science.gov (United States)

    Doherty, Iain

    2010-01-01

    We outline the project management tactics that we developed in praxis in order to manage elearning projects and show how our tactics were enhanced through implementing project management techniques from a formal project management methodology. Two key factors have contributed to our project management success. The first is maintaining a clear…

  6. Systems engineering management plan for the Salt Repository Project

    International Nuclear Information System (INIS)

    Neff, J.O.

    1986-08-01

    This document presents the plan for using systems engineering in conducting and managing the technical work of the Salt Repository Project (SRP) of the US Department of Energy's Civilian Radioactive Waste Management Program. The need for preparing a Systems Engineering Management Plan (SEMP) is traced back to relevant DOE directives. These directives are interpreted as SRP requirements in the context of the Mined Geologic Disposal System. The strategy for conducting systems engineering on the SRP, including the role of the systems engineering process, is then described. The SEMP also designates who in the project organization will be responsible for carrying out the activities. Finally, the management tools that are used to implement the systems engineering process, including associated documentation on the SRP, are described

  7. The project manager's desk reference: project planning, schedulding, evaluation, control, systems

    National Research Council Canada - National Science Library

    Lewis, James P

    2007-01-01

    In this Third Edition of The Project Manager's Desk Reference, top project management consultant James Lewis arms you with today's most comprehensive and understandable project management resources...

  8. Project and Sports Events Management

    OpenAIRE

    Sebastian Madalin MUNTEANU

    2011-01-01

    This paper tries to capture the importance it holds the project management in socio-cultural sector which stands out when we refer to the sport. So when we talk about project management in sport, to consider a much larger vision, a new project management perspective, they involve a responsibility for the implementation of an event with global impact on very long term. Sports projects, as history shows us, played a significant role in developing societies. Also, all major sports industry proje...

  9. Relationship between time management in construction industry and project management performance

    Science.gov (United States)

    Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin

    2016-08-01

    Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.

  10. Final report on Paradox Basin/Gulf Interior: Regulatory project management

    International Nuclear Information System (INIS)

    1986-12-01

    This final report on the Regulatory Project Manager (RPM) program begins with a discussion of the key products produced during the 9-year effort and then focuses on the work performed in the major disciplines. The report then discusses the management of the work effort and the Quality Assurance (QA) program. It concludes with a brief discussion of the records turned over to the Office of Nuclear Waste Isolation (ONWI) at the conclusion of the work. 14 figs., 14 tabs

  11. Making project documentation a positive tool for management

    International Nuclear Information System (INIS)

    Shirley, C.G.

    1985-01-01

    Since 1980, Sandia National Laboratory has been designing and constructing Particle Beam Fusion Accelerator II. One managerial challenge of a large project is the problem of handling information. The scope of the PBFA-II projet may be gauged by its cost: $19.4 million for the accelerator itself, $9.5 million for buildings and standard utilities, and $9.6 million for specialized utilities and support systems. The first need of the project at its outset, then, was communication, and this remains a chief function of the CPO. If the nature or magnitude of the risk changes in any one area, the entire project team must know. If a design is changed, persons working on interdependent efforts must know. Some of this communication takes place naturally and informally. But project procedures must guarantee that all important communication is received by all necessary people, that the communication creates accountability, and that management receives timely, accurate reports. To put it another way, important communication requires project documentation. Documentation is both a record of the project and a tool for management

  12. METHOD FOR SELECTION OF PROJECT MANAGEMENT APPROACH BASED ON FUZZY CONCEPTS

    Directory of Open Access Journals (Sweden)

    Igor V. KONONENKO

    2017-03-01

    Full Text Available Literature analysis of works that devoted to research of the selection a project management approach and development of effective methods for this problem solution is given. Mathematical model and method for selection of project management approach with fuzzy concepts of applicability of existing approaches are proposed. The selection is made of such approaches as the PMBOK Guide, the ISO21500 standard, the PRINCE2 methodology, the SWEBOK Guide, agile methodologies Scrum, XP, and Kanban. The number of project parameters which have a great impact on the result of the selection and measure of their impact is determined. Project parameters relate to information about the project, team, communication, critical project risks. They include the number of people involved in the project, the customer's experience with this project team, the project team's experience in this field, the project team's understanding of requirements, adapting ability, initiative, and others. The suggested method is considered on the example of its application for selection a project management approach to software development project.

  13. Traffic incident management in construction and maintenance work zones.

    Science.gov (United States)

    2009-01-01

    In 2004, the Federal Highway Administration published updated rules governing work zone safety and mobility; all highway construction and maintenance projects using federal-aid highway funds are required to develop transportation management plans (TM...

  14. Project management for complex ground-based instruments: MEGARA plan

    Science.gov (United States)

    García-Vargas, María. Luisa; Pérez-Calpena, Ana; Gil de Paz, Armando; Gallego, Jesús; Carrasco, Esperanza; Cedazo, Raquel; Iglesias, Jorge

    2014-08-01

    The project management of complex instruments for ground-based large telescopes is a challenge itself. A good management is a clue for project success in terms of performance, schedule and budget. Being on time has become a strict requirement for two reasons: to assure the arrival at the telescope due to the pressure on demanding new instrumentation for this first world-class telescopes and to not fall in over-costs. The budget and cash-flow is not always the expected one and has to be properly handled from different administrative departments at the funding centers worldwide distributed. The complexity of the organizations, the technological and scientific return to the Consortium partners and the participation in the project of all kind of professional centers working in astronomical instrumentation: universities, research centers, small and large private companies, workshops and providers, etc. make the project management strategy, and the tools and procedures tuned to the project needs, crucial for success. MEGARA (Multi-Espectrógrafo en GTC de Alta Resolución para Astronomía) is a facility instrument of the 10.4m GTC (La Palma, Spain) working at optical wavelengths that provides both Integral-Field Unit (IFU) and Multi-Object Spectrograph (MOS) capabilities at resolutions in the range R=6,000-20,000. The project is an initiative led by Universidad Complutense de Madrid (Spain) in collaboration with INAOE (Mexico), IAA-CSIC (Spain) and Universidad Politécnica de Madrid (Spain). MEGARA is being developed under contract with GRANTECAN.

  15. Modern project management theory and knowledge framework

    Institute of Scientific and Technical Information of China (English)

    Luo Zhongbao

    2014-01-01

    The scholars increasingly pay at ention to the internal rules in knowledge development and innovation of construction engineering management,as wel as the framework for engineering management body of knowledge. Considering the one-of-a-kind characteristic of construction project s and highly dependence from projects on management knowledge and its innovation,this paper analyzed the knowledge body of engineering management and its development dimension ,such as thinking and knowledge structure dimensions. The engineering management knowledge innovation model and structural model were put forward. The paper reviewed and proposed the engineering management knowledge system framework under engineering thinking mode,including the basic knowledge system framework which is used in engineering management research ,and a framework for body of knowledge which is applicable for engineering management practice. Based on a brief analysis of engineering management practice,this paper analyzed the development progres of engineering management from engineering thinking to ethical thinking and philosophical thinking. A dynamic model formed from the modern engineering management theory was put forward. The construction of projects are divided into two stages:an investment decision-making stage, and project implementation stage. According to the fact that project owners obtain the project products by transaction,the management during project implementation stage are divided into two aspects:project transaction management for the owner, and construction project management for the contractor. Thus, the three theoretical modules of modern engineering management were established:project investment decision-making management theory,engineering transaction management theory, and engineering project management theory. This paper further analyzed the content and basic theoretical issues of each theoretical module.

  16. My Work in the NASA Glenn History Office and Records Management Office

    Science.gov (United States)

    Mate, Robert C.

    2004-01-01

    This is my fourth summer working with my mentor, Kevin P. Coleman, who is the Center History Coordinator, Center Records Manager, and Center Forms Manager. I am working in the GRC History Office with some overlap in the Records Management Office. I have three major projects this summer. First, I am assisting in the documentation of historic facilities. Second, I am involved in a project to organize files and create an archives at Plum Brook Station. Third, I have helped the records management office with its inventory of stored records at Plum Brook. Also, I received an award this summer for research work I had done for NASA in the past. First, my primary project is to help assemble documentation for historic facilities at Glenn. This is somewhat of an extension of my project from last summer. Last summer, I worked to compile a complete list of all of NASA s historic sites and landmarks (as designated by the National Park Service, as well as several private organizations) throughout the country. Then, I briefly researched the significance of historic designation under federal law. Finally, I put my findings into a report which was submitted to NASA Headquarters. Upon review by the NASA History Office and several center-level history officials, it was decided that NASA should work to update its documentation of its historic sites and landmarks since some of the documentation was outdated or unavailable. Until recently, many project managers and facility managers working at historic facilities were not even aware that their surroundings had been designated as historic under federal law (most specifically, the National Historic Preservation Act of 1966 and its amendments). Therefore, they were unaware of the legal obligations for historic preservation. This summer, my project is to research some of Glenn s historic sites and landmarks in more detail. The goal is to put together a template for documenting historic NASA facilities. The hope is that this template of

  17. Accidental oil spills - project management strategy

    International Nuclear Information System (INIS)

    Bobic, V.; Benkovic, Z.

    2009-01-01

    Planning and organisation, as well as actions taken during accidental discharging of hazardous substances (hydrocarbons) into the soil and water, show that without integrating all the functions of safety, occupational safety, fire and explosion protection, technical safety, all the way to the environmental protection, procedure of cleaning, rehabilitation and remediation of polluted areas into their original state cannot be successfully carried out. Neglecting any of the mentioned links/components of the procedure represents a risk to people's health and life, while pollution to the environment remains a constant threat. Development of technologies is quickly transforming the environment in which the professionals of all disciplines work. Therefore, the response to changes by application of new technologies and procedures in all domains is indispensable, however, through a comprehensive and expert perception and consideration of each of the essential correlations comprising the safety management in all the fields. Through management of safety projects in environmental protection, it has become obvious that a united management of different fields is necessary, as well as management of safety in general. Engineering, health, legislation, public, environmental standards, occupational safety, hazards, biophysical and socio-economic aspects are parts of an integral management. Experts joined efforts through interaction and communications are inter-disciplinary characteristics, i.e. multi-disciplinary safety management, but also the management of each project separately. Exactly this knowledge exchange is highly productive and becomes an indispensable element in recognition of indirect and cumulative actions, thus applicable in any field. Implementation of European standards and accreditation of procedures pursuant to the corresponding standards, from risk assessment through rehabilitation to independent expert confirmation of efficiency in implementing the entire

  18. The rational project manager: a thinking team's guide to getting work done

    National Research Council Canada - National Science Library

    Mullins, James; Longman, Andrew

    2005-01-01

    ... into a rational methodology. This process approach continues to be a distinction and strength today, as Jim Schlick still consults for Kepner-Tregoe as a partner and project management expert. He has served as a mentor to the authors in their professional endeavors, and his ideas form the core of the book. The book also relied on sound editing, proofing, formatt...

  19. Decoupling, re-Engaging: managing trust relationships in implementation projects

    DEFF Research Database (Denmark)

    Rose, Jeremy; Schlichter, Bjarne Rerup

    2012-01-01

    , and the complex demands of managing those fluctuations. We investigate evolving trust relationships in a longitudinal case analysis of a large Integrated Hospital System implementation for the Faroe Islands. Trust relationships suffered various breakdowns, but the project was able to recover and eventually meet...... its goals. Based on concepts from Giddens’ later work on modernity, we develop two approaches for managing dynamic trust relationships in implementation projects: decoupling and re-engaging.......An important aspect of the successful implementation of large information systems (such as ERP systems) is trust. These implementations impact the legitimate interests of many groups of stakeholders, and trust is a critical factor for success. Trust in the project is contingent upon many factors...

  20. Locale-Specific Categorization of IT Projects for Proper Project Management

    Directory of Open Access Journals (Sweden)

    Muhammad Nasir

    2015-12-01

    Full Text Available In this paper we aim to show that not only are the project management techniques important for small-scale projects, but following proper project management techniques is one of the most important requirements. However, there come slight variations in implementing project management techniques in small projects as compared with larger projects. Therefore, proper categorization of projects holds the key to success in many situations. Our paper will show that categorization of a project as small-scale or large-scale should always be locale specific. In this regards, we develop a criteria and evaluate how the projects are categorized as small-scale and large-scale in different parts of the world with focus on IT projects. This research concludes that some methods cannot be used for projects of different scales.

  1. RISK MANAGEMENT AUTOMATION OF SOFTWARE PROJECTS BASED ОN FUZZY INFERENCE

    Directory of Open Access Journals (Sweden)

    T. M. Zubkova

    2015-09-01

    Full Text Available Application suitability for one of the intelligent methods for risk management of software projects has been shown based on the review of existing algorithms for fuzzy inference in the field of applied problems. Information sources in the management of software projects are analyzed; major and minor risks are highlighted. The most critical parameters have been singled out giving the possibility to estimate the occurrence of an adverse situations (project duration, the frequency of customer’s requirements changing, work deadlines, experience of developers’ participation in such projects and others.. The method of qualitative fuzzy description based on fuzzy logic has been developed for analysis of these parameters. Evaluation of possible situations and knowledge base formation rely on a survey of experts. The main limitations of existing automated systems have been identified in relation to their applicability to risk management in the software design. Theoretical research set the stage for software system that makes it possible to automate the risk management process for software projects. The developed software system automates the process of fuzzy inference in the following stages: rule base formation of the fuzzy inference systems, fuzzification of input variables, aggregation of sub-conditions, activation and accumulation of conclusions for fuzzy production rules, variables defuzzification. The result of risk management automation process in the software design is their quantitative and qualitative assessment and expert advice for their minimization. Practical significance of the work lies in the fact that implementation of the developed automated system gives the possibility for performance improvement of software projects.

  2. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S&M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S&M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the IFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of IFDP facilities was initiated in FY 1994 and will be completed in FY 1999. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $36M. The costs are summarized. Upon completion of deactivation, annual S&M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.

  3. TERMINOLOGY MANAGEMENT FRAMEWORK DEVIATIONS IN PROJECTS

    Directory of Open Access Journals (Sweden)

    Олена Борисівна ДАНЧЕНКО

    2015-05-01

    Full Text Available The article reviews new approaches to managing projects deviations (risks, changes, problems. By offering integrated control these parameters of the project and by analogy with medical terminological systems building a new system for managing terminological variations in the projects. With an improved method of triads system definitions are analyzed medical terms that make up terminological basis. Using the method of analogy proposed new definitions for managing deviations in projects. By using triad integrity built a new system triad in project management, which will subsequently also analogous to develop a new methodology of deviations in projects.

  4. Project brief of pre-contract in project management

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim; Mohd Azmi Sidid Omar; Abdul Rahman Norazumin; Zakaria Dris; Abdul Murad Abu Bakar; Alwi Othman

    2010-01-01

    Project brief is a comprehensive document used in translating the user needs and requirement for the project implementation. This document is important for the designer as a main guidance towards establishing project details. Research shown that problem usually arises from not well-defined scope and needs by the user. With lack of information the designer tend to assume and interprets wrong translation. Other issues arise from project management are time, cost, budgetary, lack of communication and establishing quality management. Some ideas of improvement were gain by doing cross reference with JKR quality system management, workshop and brainstorming. It shows that an improvement of data collection system has to be integrating with some basic format details, drawings and declaration forms to be established. (author)

  5. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  6. Female Project Managers' Workplace Problems: a Survey

    Science.gov (United States)

    Duong, Thuong Thi; Skitmore, Martin

    This article examines the extent to which challenges in the workplace may cause female project managers to be in a significantly small minority. A survey of members of the Australian Institute of Project Management in Queensland is described. This compares the experiences and observations of both men and women on various issues related to technical and gender aspects in project management workplaces. The results show that although female project managers experience many problems, male project managers also experience most of the same problems. Likewise, there are also few differences between more and less experience, the level of management, and types of industries. The differences that do occur involve discrimination against women in general, differences in project management styles, and support from other project managers.

  7. ADVERTISEMENTS FOR ICT PROJECT MANAGERS SHOW DIVERSITY BETWEEN SWEDISH EMPLOYERS’ AND PROJECT MANAGEMENT ASSOCIATIONS’ VIEWS OF PM CERTIFICATIONS

    Directory of Open Access Journals (Sweden)

    Siw Lundqvist

    2014-05-01

    Full Text Available Appointing ICT project managers is a delicate issue for management; not least since ICT projects are known to be unsuccessful in delivering the required product in time and on budget. Hence, it is even more important to find the “right” individual for the job. According to project management associations, certification in project management is a prerequisite for a project manager’s successful career. The appreciation of project management certifications among Swedish employers was studied using data collected from job advertisements for ICT project managers during four years (2010-2013. Judged on how the advertisements were worded the result indicates surprisingly low interest from the employers’ side, which conflicts with the project management associations statements about the certifications’ indispensable value for successful projects. Furthermore, it conflicts with a common understanding of certifications as essential for appointment as a project manager. The findings identify a possible gap between PM associations’ and employers’ views regarding the certifications’ value, and highlight the necessity of seriously considering whether it is worthwhile for the individuals to strive for, and for the organizations to promote certification, since it is costly in both time, effort and money.

  8. Habitat Demonstration Unit Project Leadership and Management Strategies

    Science.gov (United States)

    Kennedy, Kriss J.

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and

  9. RadWorks Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The RadWorks project's overarching objective is the maturation and demonstration of affordable, enabling solutions to the radiation-related challenges presented to...

  10. Project Management in Higher Education

    Science.gov (United States)

    Alpert, Shannon Atkinson

    2011-01-01

    This study identified factors that influenced the use of project management in higher education research projects. Using a qualitative grounded theory approach that included in-depth interviews with assistant professors, the researcher examined how these individuals were using project management processes and tools and factors that enabled,…

  11. Digital project management the complete step-by-step guide to a successful launch

    CERN Document Server

    Olson, Taylor

    2016-01-01

    The digital world is growing and changing at a rate that can seem overwhelming to those project managers who have to keep up with it to build customer-facing solutions and applications. It's rare for project managers working in this field to be provided with much direction or a process by which to carry out a project, and there has been next to nothing available specific to these types of projects in the literary marketplace. Digital Project Management: The Complete Step-by-Step Guide to a Successful Launch was developed to fill this gap by providing the knowledge, best practices and proven steps to consistently managing these types of project successfully from end-to-end now, and in the future with just minor adjustments to adapt to changes in technology.

  12. On Services for Collaborative Project Management

    Science.gov (United States)

    Ollus, Martin; Jansson, Kim; Karvonen, Iris; Uoti, Mikko; Riikonen, Heli

    This paper presents an approach for collaborative project management. The focus is on the support of collaboration, communication and trust. Several project management tools exist for monitoring and control the performance of project tasks. However, support of important intangible assets is more difficult to find. In the paper a leadership approach is identified as a management means and the use of new IT technology, especially social media for support of leadership in project management is discussed.

  13. Project Work in Networked Distance Education

    DEFF Research Database (Denmark)

    Knudsen, Morten; Helbo, Jan; Jensen, Lars Peter

    2000-01-01

    devoted to courses and the other half to project work. A computer conference system, LuvitÒ provides facilities for the courses, as well as structured synchronous and asynchronous communication. Eight times per year two-day seminars are held at the university for intensive lectures, project work......Problem oriented project work has been the foundation for the educational system at Aalborg University since its start 25 years ago. The duration of each student project is one semester, and the students spend half of their time working on the project in groups of typically 5-6 persons....... As the experience since then has proven this to be a very successful innovation in higher education [1], it seems to be an obvious idea also to base our new distance educations on the project study form. Traditionally, however, distance education has been characterized by one-way communication and self...

  14. Study on the relationship between project management and organizational efficacy in nonprofit organizations

    Directory of Open Access Journals (Sweden)

    Kao I-Chan

    2018-01-01

    Full Text Available This study treats the members in nonprofit organizations (NPOs as subjects, and explores the origination, planning, control, and completion of project management in NPOs, as well as the general performance of organizational efficacy, such as environmental satisfaction, organizational atmosphere, operational performance, job engagement, and work quality. It also probes into the relationship and effect. By various research methods, such as literature review and questionnaire survey, this study attempts to determine if project management in NPOs can significantly enhance organizational efficacy. This study finds that different NPOs have significant differences in the general performance of project management and organizational efficacy. When the performance of project management in NPOs is more significant, organizational efficacy is higher. Project management in NPOs has a significant path relationship to organizational efficacy; therefore, reinforcement of vocational training in the project management of NPOs could improve performance, which would have significant effect on enhancing organizational efficacy.

  15. A Management Maturity Model (MMM for project-based organisational performance assessment

    Directory of Open Access Journals (Sweden)

    Craig Langston

    2016-12-01

    Full Text Available Common sense suggests that organisations are more likely to deliver successful projects if they have systems in place that reflect a mature project environment based on a culture of continuous improvement. This paper develops and discusses a Management Maturity Model (MMM to assess the maturity of project management organisations through a customisable, systematic, strategic and practical methodology inspired from the seminal work of Darwin, Deming, Drucker and Daniel. The model presented is relevant to organisations, such as construction and engineering companies, that prefer to use the Project Management Body of Knowledge (PMBOK™ Guide published by the Project Management Institute (PMI, but without the disadvantages of excessive time and cost commitments and a ‘one size fits all’ approach linked to rigid increments of maturity. It offers a game-changing advance in the application of project-based organisational performance assessment compared to existing market solutions that are unnecessarily complex. The feasibility of MMM is field-tested using a medium-sized data centre infrastructure firm in Tehran.

  16. Managing Stress. Project Seed.

    Science.gov (United States)

    Muto, Donna; Wilk, Jan

    One of eight papers from Project Seed, this paper describes a stress management project undertaken with high school sophomores. Managing Stress is described as an interactive workshop that offers young people an opportunity to examine specific areas of stress in their lives and to learn effective ways to deal with them. The program described…

  17. 76 FR 56363 - Capital Project Management

    Science.gov (United States)

    2011-09-13

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... current FTA rule for project management oversight into a discrete set of managerial principles for sponsors of major capital projects; enable FTA to more clearly identify the necessary management capacity...

  18. 78 FR 16460 - Capital Project Management

    Science.gov (United States)

    2013-03-15

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... withdrawing its September 13, 2011, Notice of Proposed Rulemaking to revise the agency's project management... will reinitiate a rulemaking for project management oversight in the near future. Additionally, FTA may...

  19. The Waste Isolation Pilot Plant (WIPP) integrated project management system

    International Nuclear Information System (INIS)

    Olona, D.; Sala, D.

    1993-01-01

    The Waste Isolation Pilot Plant (WIPP), located 26 miles east of Carlsbad, New Mexico, is a research and development project of the Department of Energy (DOE), tasked with the mission of demonstrating the safe disposal of transuranic (TRU) radioactive wastes. This unique project was authorized by Congress in 1979 in response to the national need for long-term, safe methods for disposing of radioactive by-products from our national defense programs. The WIPP was originally established in December of 1979, by Public Law 96-164, DOE National Security and Military Applications of Nuclear Energy Authorization Act of 1980. Since the inception of the WIPP Project, work has continued to prepare the facility to receive TRU wastes. Studies continue to be conducted to demonstrate the safety of the WIPP facility in accordance with federal and state laws, state agreements, environmental regulations, and DOE Orders. The objectives of implementing an integrated project management system are to assure compliance with all regulatory and federal regulations, identify areas of concern, provide justification for funding, provide a management tool for control of program workscope, and establish a project baseline from which accountability and performance will be assessed. Program management and project controls are essential for the success of the WIPP Project. The WIPP has developed an integrated project management system to establish the process for the control of the program which has an expected total dollar value of $2B over the ten-year period from 1990-2000. The implementation of this project management system was motivated by the regulatory requirements of the project, the highly public environment in which the project takes place, limited funding and resources, and the dynamic nature of the project. Specific areas to be addressed in this paper include strategic planning, project organization, planning and scheduling, fiscal planning, and project monitoring and reporting

  20. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  1. Managing dualities in organizational change projects

    OpenAIRE

    Shaw, David

    2016-01-01

    When managers want to change their organisation they often set up a project to do it, in the belief that doing so simplifies and focuses the change initiative and brings greater assurance of success. Case studies of three organisational change projects undertaken by Arts Council England during 2006-2007 are used to examine the notion of project management and change management as a duality. It is argued that the structured, systematic approach associated with project management needs to be ba...

  2. Adaptation of Agile Project Management Methodology for Project Team

    Directory of Open Access Journals (Sweden)

    Rasnacis Arturs

    2015-12-01

    Full Text Available A project management methodology that defines basic processes, tools, techniques, methods, resources and procedures used to manage a project is necessary for effective and successful IT project management. Each company needs to define its own methodology or adapt some of the existing ones. The purpose of the research is to evaluate the possibilities of adapting IT project development methodology according to the company, company employee characteristics and their mutual relations. The adaptation process will be illustrated with a case study at an IT company in Latvia where the developed methodology is based on Agile Scrum, one of the most widespread Agile methods.

  3. [The research project: financing and management].

    Science.gov (United States)

    Schena, F P

    2003-01-01

    Basic and clinical research is accomplished by projects. The design of a project is not only based on the scientific content but also on its financing and management. This article wants to illustrate the correct modalities for project financing and project management in a scientific project.

  4. Project management plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory. Environmental Restoration Program

    International Nuclear Information System (INIS)

    1995-01-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place nineteen former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S ampersand M) and as quickly and economically as possible. Implementation and completion of the deactivation project win further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S ampersand M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project

  5. 76 FR 67400 - Capital Project Management

    Science.gov (United States)

    2011-11-01

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... extending the comment period on its proposed rule for Capital Project Management to December 2, 2011, to...) proposing to transform the current FTA rule for project management oversight into a discrete set of...

  6. HBR guide to project management

    CERN Document Server

    Harvard Business Review

    2013-01-01

    MEET YOUR GOALS—ON TIME AND ON BUDGET. How do you rein in the scope of your project when you’ve got a group of demanding stakeholders breathing down your neck? And map out a schedule everyone can stick to? And motivate team members who have competing demands on their time and attention? Whether you’re managing your first project or just tired of improvising, this guide will give you the tools and confidence you need to define smart goals, meet them, and capture lessons learned so future projects go even more smoothly. The HBR Guide to Project Management will help you: • Build a strong, focused team • Break major objectives into manageable tasks • Create a schedule that keeps all the moving parts under control • Monitor progress toward your goals • Manage stakeholders’ expectations • Wrap up your project and gauge its success

  7. Automated Procurement System (APS): Project management plan (DS-03), version 1.2

    Science.gov (United States)

    Murphy, Diane R.

    1994-01-01

    The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  8. Project management strategies for prototyping breakdowns

    DEFF Research Database (Denmark)

    Granlien, Maren Sander; Pries-Heje, Jan; Baskerville, Richard

    2009-01-01

    , managing the explorative and iterative aspects of prototyping projects is not a trivial task. We examine the managerial challenges in a small scale prototyping project in the Danish healthcare sector where a prototype breakdown and project escalation occurs. From this study we derive a framework...... of strategies for coping with escalation in troubled prototyping projects; the framework is based on project management triangle theory and is useful when considering how to manage prototype breakdown and escalation. All strategies were applied in the project case at different points in time. The strategies led...

  9. PROJECT APPROACH TO ENERGY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Інга Борисівна СЕМКО

    2016-02-01

    Full Text Available Project management is widely used around the world as a tool to improve business performance. Correct implementation of the program of implementation of energy efficiency is accompanied by the adoption of an appropriate legislative framework, support programs, the approval of market-based instruments. Currently, it is paying enough attention to the effective application of market-based instruments, although most of the activities in the field of energy efficiency from the economic side are quite profitable. The authors suggested the use of the methodology of project management to the management of energy-saving measures, new approaches to the place and role of project management in the hierarchy of guidance. As a result, this innovation can improve the competitiveness of enterprises. The conclusions that the energy-saving project management allows you to get the best results for their implementation by reducing the time, resources, risk reduction.

  10. PROJECT MANAGEMENT CONSIDERED IN A 2014 PERSPECTIVE

    OpenAIRE

    GRAPA ADELINA-ROXANA; SOARE ALICE-MAGDALENA

    2014-01-01

    Project Management has come of age, yet multiple surveys and reports confirm the fact that the majority of projects are challenged. Given the more demanding and strict financial constraints associated with the current fiscal climate, project management is regarded as a tool that can deliver more with less. The literature on Project Management shows that, in spite of advancement in Project Management processes, tools and systems, project success has not significantly improved. T...

  11. Brokerage by a Project Manager across a New Product Development Project

    DEFF Research Database (Denmark)

    Jepsen, Lisbeth Brøde; Jepsen, Anna Lund; Dietrich, Perttu

    2012-01-01

    between three subtypes of brokerage: Brokerage connecting actors from the project team with actors from the various departments within the same organization (intra-organizational brokerage), brokerage connecting employees at the NPD organization with someone working in another organization (inter...... as a hub between possible suppliers for the project. We had also expected that the PM would be more involved in coordination of, to and from the project team than what we found in this study. Based on the study, it seems that some of the connections that we, based on existing knowledge, would expect...... that the management of the project in terms of linking the stakeholders takes off in the solution development phase rather than in the concept development phase which is the phase in focus in large parts of the research that has taken place in this field. Further, contrary to expectations based on existing knowledge...

  12. Globalization And Knowledge Management In Projects

    Directory of Open Access Journals (Sweden)

    Bubel Dagmara

    2015-06-01

    Full Text Available Knowledge management is a field of management dealing with the use of knowledge, methods, and tools to effectively coordinate complex and unique projects. In accordance with this definition, project knowledge can be treated as a useful resource of information that allows projects to be implemented in compliance with its objectives: time, costs, and quality of results. Knowledge in the activity of an organization, including in the implementation of projects, has for many years been an area of interest to researchers, who confirmed its key importance for building permanent competitive advantages of companies and enterprises. In project management, this issue takes on a new character, as it is transferred to the field of dynamic, time restricted, temporary, and team-implemented projects. The aim of this paper is to present the results of a survey regarding the use of practices of knowledge management in projects in international organizations and to show that the concept of knowledge management in projects is a tool conducive to spreading the process of globalization.

  13. Homogenisation in project management for large German research projects in the Earth system sciences: overcoming the institutional coordination bias

    Science.gov (United States)

    Rauser, Florian; Vamborg, Freja

    2016-04-01

    The interdisciplinary project on High Definition Clouds and Precipitation for advancing climate prediction HD(CP)2 (hdcp2.eu) is an example for the trend in fundamental research in Europe to increasingly focus on large national and international research programs that require strong scientific coordination. The current system has traditionally been host-based: project coordination activities and funding is placed at the host institute of the central lead PI of the project. This approach is simple and has the advantage of strong collaboration between project coordinator and lead PI, while exhibiting a list of strong, inherent disadvantages that are also mentioned in this session's description: no community best practice development, lack of integration between similar projects, inefficient methodology development and usage, and finally poor career development opportunities for the coordinators. Project coordinators often leave the project before it is finalized, leaving some of the fundamentally important closing processes to the PIs. This systematically prevents the creation of professional science management expertise within academia, which leads to an automatic imbalance that hinders the outcome of large research programs to help future funding decisions. Project coordinators in academia often do not work in a professional project office environment that could distribute activities and use professional tools and methods between different projects. Instead, every new project manager has to focus on methodological work anew (communication infrastructure, meetings, reporting), even though the technological needs of large research projects are similar. This decreases the efficiency of the coordination and leads to funding that is effectively misallocated. We propose to challenge this system by creating a permanent, virtual "Centre for Earth System Science Management CESSMA" (cessma.com), and changing the approach from host- based to centre-based. This should

  14. Project management. A discipline which contributes to project success

    International Nuclear Information System (INIS)

    Hoch, G.

    2008-01-01

    The presentation covers the following topics: description of the Project - a contract was signed between KNPP and European Consortium Kozloduy (ECK) consisting of Framatome ANP GmbH as Leader (63%), Framatome ANP S.A.S. (17%), Atomenergoexport (20%) ; Project management in the modernization of NPP Kozloduy units 5 and 6; Project management process within AREVA NP GmbH; current status

  15. MANAGING INNOVATION PROJECTS USING DISTRIBUTION LOGISTICS

    Directory of Open Access Journals (Sweden)

    Erika Loučanová

    2015-12-01

    Full Text Available A significant part of innovation projects management is the distribution logistics. From the point of view of time and material content, the properly chosen way of distribution is one of many factors for success of the project and innovation creation itself. The paper points out the fundamental basis of innovation management in the stage of its realization referring to the importance of distribution logistics in this part of innovation project management. Distribution logistics in the project management provides comprehensive solutions to efficiency of tangible relocating processes in all connections and mutual relations of project in order to maintain compliance between economy and business when implementing innovations.

  16. Chosen aspects of innovative projects management

    Directory of Open Access Journals (Sweden)

    J. Gawlik

    2010-07-01

    Full Text Available Any company willing to maintain its market position has to search and implement innovative products and services. Integrated development ofenterprise’s innovative activity requests a constant search for new technologies and new organizational forms. Ability of effectivemanagement of innovative projects becomes a crucial issue. The paper presents a characteristic of innovative projects accordingly toOECD standards. Project management concepts based on Project Management Institute (PMI and International Project ManagementAssociation (IPMA procedures have been discussed. Key success factors have been defined, i.e.: obtaining assumed project outcome (range, project implementation conform to planned schedule (deadline, maintaining project costs under a certain limit (budget, quality (are the customers satisfied?, resources (team losses and interpersonal relations. Tables comparing product innovativeness with fields of requested know – how for particular product innovativeness levels have been elaborated. Finally, SCRUM method of adaptive project management aiming at providing possibly optimal outcome has been described.

  17. Managing a project's legacy: implications for organizations and project management

    Science.gov (United States)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  18. Application of Project Portfolio Management

    Science.gov (United States)

    Pankowska, Malgorzata

    The main goal of the chapter is the presentation of the application project portfolio management approach to support development of e-Municipality and public administration information systems. The models of how people publish and utilize information on the web have been transformed continually. Instead of simply viewing on static web pages, users publish their own content through blogs and photo- and video-sharing slides. Analysed in this chapter, ICT (Information Communication Technology) projects for municipalities cover the mixture of the static web pages, e-Government information systems, and Wikis. So, for the management of the ICT projects' mixtures the portfolio project management approach is proposed.

  19. Project Management Methods in Projects Co-financed by EU Funds

    OpenAIRE

    Kostalova, Jana; Tetrevova, Libena; Patak, Michal

    2017-01-01

    This paper deals with the management of projects co-financed by European Union funds (structural funds and the Cohesion Fund) in the Czech Republic (EU projects). The authors aimed to analyze and assess the scope of familiarity with basic project management methods and their application within the implementation of EU projects in the Czech Republic in the Programming Period 2007–2013. Based on a questionnaire survey of EU project organisers, the authors evaluate their attitudes to project man...

  20. Experiential learning in control systems laboratories and engineering project management

    Science.gov (United States)

    Reck, Rebecca Marie

    2015, a panel of 40 control systems faculty members, from a variety of institutions, completed a multi-round Delphi survey in order to bring them toward consensus on the common aspects of their laboratories. The following winter, 45 additional faculty members and practitioners from the control systems community completed a follow-up survey to gather feedback on the results of the Delphi survey. During the Delphi study, the panelists identified 15 laboratory objectives, 26 concepts, and 15 components that were common in their laboratories. Then in both the Delphi survey and follow-up survey each participant rated the importance of each of these items. While the average ratings differed slightly between the two groups, the order of each set of items was compared with two different tests and the order was found to be similar. Some of the common and important learning objectives include connecting theory to what is implemented and observed in the laboratory, designing controllers, and modeling and simulating systems. The most common component in both groups was Math-Works software. Some of the common concepts include block diagrams, stability, and PID control. Defining common aspects of undergraduate control systems laboratories enables common development, detailed comparisons, and simplified adaptation of equipment and experiments between campuses and programs. Throughout an undergraduate program in engineering, there are multiple opportunities for hands-on laboratory experiences that are related to course content. However, a similarly immersive experience for project management graduate students is harder to incorporate for all students in a course at once. This study explores an experiential learning opportunity for graduate students in engineering management or project management programs. The project management students enroll in a project management course. Undergraduate students interested in working on a project with a real customer enroll in a different projects

  1. Independent management and financial review, Yucca Mountain Project, Nevada. Final report, Appendix

    International Nuclear Information System (INIS)

    1995-01-01

    The Nuclear Waste Policy Act of 1982 (Public Law 97-425), as amended by Public Law 100-203, December 22, 1987, established the Office of Civilian Radioactive Waste Management (OCRWM) within the Department of Energy (DOE), and directed the Office to investigate a site at Yucca Mountain, Nevada, to determine if this site is suitable for the construction of a repository for the disposal of high level nuclear waste. Work on site characterization has been under way for several years. Thus far, about $1.47 billion have been spent on Yucca Mountain programs. This work has been funded by Congressional appropriations from a Nuclear Waste Fund to which contributions have been made by electric utility ratepayers through electric utilities generating power from nuclear power stations. The Secretary of Energy and the Governor of the State of Nevada have appointed one person each to a panel to oversee an objective, independent financial and management evaluation of the Yucca Mountain Project. The Requirements for the work will include an analysis of (1) the Yucca Mountain financial and, contract management techniques and controls; (2) Project schedules and credibility of the proposed milestones; (3) Project organizational effectiveness and internal planning processes, and (4) adequacy of funding levels and funding priorities, including the cost of infrastructure and scientific studies. The recipient will provide monthly progress report and the following reports/documents will be presented as deliverables under the contract: (1) Financial and Contract Management Preliminary Report; (2) Project Scheduling Preliminary Report; (3)Project Organizational Effectiveness Preliminary Report; (4) Project Funding Levels and Funding Priorities Preliminary Report; and (5) Final Report

  2. Independent management and financial review, Yucca Mountain Project, Nevada. Final report, Appendix

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-15

    The Nuclear Waste Policy Act of 1982 (Public Law 97-425), as amended by Public Law 100-203, December 22, 1987, established the Office of Civilian Radioactive Waste Management (OCRWM) within the Department of Energy (DOE), and directed the Office to investigate a site at Yucca Mountain, Nevada, to determine if this site is suitable for the construction of a repository for the disposal of high level nuclear waste. Work on site characterization has been under way for several years. Thus far, about $1.47 billion have been spent on Yucca Mountain programs. This work has been funded by Congressional appropriations from a Nuclear Waste Fund to which contributions have been made by electric utility ratepayers through electric utilities generating power from nuclear power stations. The Secretary of Energy and the Governor of the State of Nevada have appointed one person each to a panel to oversee an objective, independent financial and management evaluation of the Yucca Mountain Project. The Requirements for the work will include an analysis of (1) the Yucca Mountain financial and, contract management techniques and controls; (2) Project schedules and credibility of the proposed milestones; (3) Project organizational effectiveness and internal planning processes, and (4) adequacy of funding levels and funding priorities, including the cost of infrastructure and scientific studies. The recipient will provide monthly progress report and the following reports/documents will be presented as deliverables under the contract: (1) Financial and Contract Management Preliminary Report; (2) Project Scheduling Preliminary Report; (3)Project Organizational Effectiveness Preliminary Report; (4) Project Funding Levels and Funding Priorities Preliminary Report; and (5) Final Report.

  3. Human resource management in the project-oriented organization: Employee well-being and ethical treatment

    NARCIS (Netherlands)

    Turner, R.; Huemann, M.; Keegan, A.

    2008-01-01

    As part of a wider study into human resource management (HRM) practices in project-oriented organizations, we investigated the issue of employee well-being. Project-oriented organizations adopt temporary work processes to deliver products and services to clients. This creates a dynamic work

  4. The Little Black Book of Project Management

    CERN Document Server

    Thomsett, Michael C

    2009-01-01

    For nearly twenty years, The Little Black Book of Project Management has provided businesspeople everywhere with a quick and effective introduction to project management tools and methodology. The revised and updated third edition reflects the newest techniques, the latest project management software, as well as the most recent changes to the Project Management Body of Knowledge (PMBOK™). Readers will find invaluable strategies for: • Organizing any project • Choosing the project team • Preparing a budget and sticking to it • Scheduling, flowcharting, and controlling a project • Preparing proj

  5. Role of quality assurance vs project manager's responsibility for waste projects

    International Nuclear Information System (INIS)

    Solecki, J.

    1989-01-01

    This paper takes a project manager's perspective and discusses the role of the quality assurance organization in the development, implementation and interface related to the QA program for waste projects. The author describes the role which the QA program plays in allowing project management to assure that the project manager knows what is placed in the repository and the characteristics of the surrounding environment meet closure requirements

  6. STRATEGIC DECISION MAKING IN THE MANAGEMENT OF PROJECTS, AIMED AT THE BIM

    Directory of Open Access Journals (Sweden)

    Burneo Valarezo Servio

    2016-12-01

    Full Text Available Decision making in the management of projects aimed at Building Information Modeling, represents the main action to be developed during the development of the investment lifecycle, from inception to the development of life, decision marking is present in all phases of project management. In the Fund's shares of the production system by projects, decision making integrated from the priorities of the projects play an important role in the success of the company. The present work has as objective the development of a procedure for decision making during the life cycle of the project, the conditions for its implementation and the process for its development, with the purpose of raising their quality, to ensure decision making effective, consistent with the current development of the techniques of management.

  7. Construction Project Administration and Management for Mitigating Work Zone Accidents and Fatalities: An Integrated Risk Management Model

    Science.gov (United States)

    2009-10-01

    The goal of this research is to mitigate the risk of highway accidents (crashes) and fatalities in work zones. The approach of this research has been to address the mitigation of work zone crashes through the creation of a formal risk management mode...

  8. Analyzing Project Management Maturity Level in Indonesia

    Directory of Open Access Journals (Sweden)

    Eliot Simangunsong

    2013-04-01

    Full Text Available Project management has been generally known and increasingly used by many organizations to gain competitive advantage. In this context, many studies have proposed maturity models to evaluate how project management knowledge has been deployed effectively and efficiently in or- ganization. As a developing country, Indonesia needs many development projects managed by government and private companies in different industries. Here, a study to assess project manage- ment maturity level in Indonesian businesses may bring insight about current business practices, which is important to speed up country development and business sustainability. Adapting the Project Management Maturity Model (ProMMM, a survey instrument has been developed and ap- plied to professionals from Jakarta and surrounding area. The result of analysis shows that con- struction and primary industry have a higher maturity level compare to manufacturing and servic- es. It is to be noted, however, that the level of project management understanding is low across in- dustries. This indicates that more quality project management training or certification is required to improve overall project management knowledge in Indonesia.

  9. Sample management implementation plan: Salt Repository Project

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of the Sample Management Implementation Plan is to define management controls and building requirements for handling materials collected during the site characterization of the Deaf Smith County, Texas, site. This work will be conducted for the US Department of Energy Salt Repository Project Office (SRPO). The plan provides for controls mandated by the US Nuclear Regulatory Commission and the US Environmental Protection Agency. Salt Repository Project (SRP) Sample Management will interface with program participants who request, collect, and test samples. SRP Sample Management will be responsible for the following: (1) preparing samples; (2) ensuring documentation control; (3) providing for uniform forms, labels, data formats, and transportation and storage requirements; and (4) identifying sample specifications to ensure sample quality. The SRP Sample Management Facility will be operated under a set of procedures that will impact numerous program participants. Requesters of samples will be responsible for definition of requirements in advance of collection. Sample requests for field activities will be approved by the SRPO, aided by an advisory group, the SRP Sample Allocation Committee. This document details the staffing, building, storage, and transportation requirements for establishing an SRP Sample Management Facility. Materials to be managed in the facility include rock core and rock discontinuities, soils, fluids, biota, air particulates, cultural artifacts, and crop and food stuffs. 39 refs., 3 figs., 11 tabs

  10. 33 CFR 385.24 - Project Management Plans.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  11. Teaching empirical finance courses: A project on portfolio management

    Directory of Open Access Journals (Sweden)

    Bruce Morley

    2016-12-01

    Full Text Available The aim of this article was to assess the use of a group-based project for an empirical finance type of course. It examines the outline of the project, the methodology the students are encouraged to follow and how the course is assessed. This approach enables the students to apply many of the techniques learnt on this course and other courses such as econometrics, to determine an optimal portfolio of assets given their view on the risks in the economy. The emphasis is on risk management through portfolio diversification and the use of a simple hedge strategy. The overall aim was to introduce the students to the basics of portfolio management, as many work in this industry for their industrial placements and when they graduate. The main contribution to the literature is through the analysis of an empirically based portfolio management project. The feedback from the students suggests they felt that they had learnt useful concepts and information, in an enjoyable exercise.

  12. Applied software risk management a guide for software project managers

    CERN Document Server

    Pandian, C Ravindranath

    2006-01-01

    Few software projects are completed on time, on budget, and to their original specifications. Focusing on what practitioners need to know about risk in the pursuit of delivering software projects, Applied Software Risk Management: A Guide for Software Project Managers covers key components of the risk management process and the software development process, as well as best practices for software risk identification, risk planning, and risk analysis. Written in a clear and concise manner, this resource presents concepts and practical insight into managing risk. It first covers risk-driven project management, risk management processes, risk attributes, risk identification, and risk analysis. The book continues by examining responses to risk, the tracking and modeling of risks, intelligence gathering, and integrated risk management. It concludes with details on drafting and implementing procedures. A diary of a risk manager provides insight in implementing risk management processes.Bringing together concepts ...

  13. Theoretical background to orient the universitary projects management to local development.

    Directory of Open Access Journals (Sweden)

    Naybi Salas Vargas

    2012-03-01

    Full Text Available Nowadays the resources administration is a problem to be solved, and is remarkable the universities role to orient knowledge to the expected local development. With the communion of the university and the main decisors at local and territorial contexts, it is evident the development of alternatives that diminish existing breaches in the known projects management Anytime the projects development context is diverse and multicultural, all the knowledge elements that provide new forms are useful experiences without point out unique recipees. The development dynamic evolution in the territories continues being an urgency for human survival.The projects management, notable in international cooperation actions as the international dimension of the extensionist activity and in the science contributions, are reduced in their foccus to the promotion of local development, what points out the need to orient the universitary processes to the territorial development of the province, in particular the projects management. The objective of this work is to offer a guidance of foundations that allow to orient the management of universtary projects to local development.

  14. Completion of Launch Director Console Project and Other Support Work

    Science.gov (United States)

    Steinrock, Joshua G.

    2018-01-01

    There were four projects that I was a part of working on during the spring semester of 2018. This included the completion of the Launch Director Console (LDC) project and the completion and submission of a Concept of Operations (ConOps) document for the Record and Playback System (RPS) at the Launch Control Center (LCC), as well as supporting the implementation of a unit in RPS known as the CDP (Communication Data Processor). Also included was my support and mentorship of a High School robotics team that is sponsored by Kennedy Space Center. The LDC project is an innovative workstation to be used by the launch director for the future Space Launch System program. I worked on the fabrication and assembly of the final console. The ConOps on RPS is a technical document for which I produced supporting information and notes. All of this was done in the support of the IT Project Management Office (IT-F). The CDP is a subsystem that will eventually be installed in and operated by RPS.

  15. A maturation model for project-based organisations – with uncertainty management as an always remaining multi-project management focus

    Directory of Open Access Journals (Sweden)

    Anna Jerbrant

    2014-02-01

    Full Text Available The classical view of multi-project management does not capture its dynamic nature. Present theory falls short in the expositive dimension of how management of project-based companies evolves because of their need to be agile and adaptable to a changing environment. The purpose of this paper is therefore to present a descriptive model that elucidates the maturation processes in a project-based organization as well as to give an enhanced understanding of multi-project management in practice. The maturation model displays how the management of project-based organizations evolves between structuring administration and managing any uncertainty, and emphasizes the importance of active individual actions and situated management actions that haveto be undertaken in order to coordinate, synchronize, and communicate the required knowledge and skills.The outcomes primarily reveal that, although standardized project models are used and considerable resources are spent on effective project portfolio management, how information and communication are executedis essential for the management of project-based organizations. This is particularly true for informal and non-codified communication.

  16. Agile Project Management with Scrum

    CERN Document Server

    Schwaber, Ken

    2009-01-01

    The rules and practices for Scrum-a simple process for managing complex projects-are few, straightforward, and easy to learn. But Scrum's simplicity itself-its lack of prescription-can be disarming, and new practitioners often find themselves reverting to old project management habits and tools and yielding lesser results. In this illuminating series of case studies, Scrum co-creator and evangelist Ken Schwaber identifies the real-world lessons-the successes and failures-culled from his years of experience coaching companies in agile project management. Through them, you'll understand how to

  17. Creatvity in Project Work

    DEFF Research Database (Denmark)

    Bjørner, Thomas; Kofoed, Lise B.; Bruun-Pedersen, Jon Ram

    2012-01-01

    that they are creative during all stages in the project work. However, it is also significant that the Medialogy students believe that they are more creative in the beginning of their projects and during the design and implementation stages, whereas the analysis is a less creative part. In general, the Medialogy...

  18. Conflict Approaches of Effective Project Manager in the Upstream Sector of Indonesian Oil & Gas Industry

    Directory of Open Access Journals (Sweden)

    Adhi Cahyono

    2012-10-01

    Full Text Available Conflict can be functional or dysfunctional to the organization’s performance. This study focused on the relationship between conflict approaches implemented by the project manager based on project team member’s perception on the effectiveness of the project manager in managing project’s conflict. Questionnaires were modified from Barker et al. (1988 to measure conflict management approaches and outcomes of managing project conflict. Data were gathered from 57 respondents who worked in the Engineering, Procurement, and Construction (EPC contractors serving the upstream sector of the Oil and Gas industry in Indonesia. By using Pearson correlation, result of this study indicated that project managers were perceived to be effective in managing project conflict when implementing cooperative and confi rmative approaches, but ineffective when combining competitive and avoidance approaches. Further research should investigate correlation between cultural dimensions with conflict approaches and outcomes of managing conflict.

  19. MULTIPLE PROJECT MANAGEMENT IN THE CONSTRUCTION INDSUTRY

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2010-06-01

    Full Text Available The field of project management has historically focused on the administration of one project at a time, a focus that is insufficient given the growing need for organizations to manage multiple projects simultaneously. The requirements of Multiple Project Management (MPM involves demands and practices that are different from those of single projects. MPM poses a special need for coordination of shared resources across multiple projects in a way that can maintain the firm’s strategic focus and facilitate effective decision making. The construction industry is noteworthy for its frequent need for the management of multiple projects. This paper offers a review of the last five years of indexed literature related to multiple project management in the construction industry, identifies gaps and suggests promising new avenues of inquiry.

  20. Project management and Enterprise systems

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2006-01-01

    Implementing and Operating integrated Enterprise Systems are a multidimensional effort. It seriously challenges the IT supplier as well as the professional service provider client. The paper discuss these issues in a project management perspective. A framework for supporting project management...

  1. Conceptions of Software Development by Project Managers: A Study of Managing the Outsourced Development of Software Applications for United States Federal Government Agencies

    Science.gov (United States)

    Eisen, Daniel

    2013-01-01

    This study explores how project managers, working for private federal IT contractors, experience and understand managing the development of software applications for U.S. federal government agencies. Very little is known about how they manage their projects in this challenging environment. Software development is a complex task and only grows in…

  2. 97 Things Every Project Manager Should Know

    CERN Document Server

    Davis, Barbee

    2009-01-01

    If the projects you manage don't go as smoothly as you'd like, 97 Things Every Project Manager Should Know offers knowledge that's priceless, gained through years of trial and error. This illuminating book contains 97 short and extremely practical tips -- whether you're dealing with software or non-IT projects -- from some of the world's most experienced project managers and software developers. You'll learn how these professionals have dealt with everything from managing teams to handling project stakeholders to runaway meetings and more. While this book highlights software projects, its w

  3. Project management as steppingstone of enterprises

    OpenAIRE

    Andreeva, T.; Petrovska, T.; Tytar, T.

    2011-01-01

    Actual problems of project management in enterprises in order to achieve their goals. The basic members of the organization and implementation of project and the methodology for their implementation. The basic principles of project management are included.

  4. Managing large energy and mineral resources (EMR) projects in challenging environments

    Science.gov (United States)

    Chanmeka, Arpamart

    The viability of energy mineral resources (EMR) construction projects is contingent upon the state of the world economic climate. Oil sands projects in Alberta, Canada exemplify large EMR projects that are highly sensitive to fluctuations in the world market. Alberta EMR projects are constrained by high fixed production costs and are also widely recognized as one of the most challenging construction projects to successfully deliver due to impacts from extreme weather conditions, remote locations and issues with labor availability amongst others. As indicated in many studies, these hardships strain the industry's ability to execute work efficiently, resulting in declining productivity and mounting cost and schedule overruns. Therefore, to enhance the competitiveness of Alberta EMR projects, project teams are targeting effective management strategies to enhance project performance and productivity by countering the uniquely challenging environment in Alberta. The main purpose of this research is to develop industry wide benchmarking tailored to the specific constraints and challenges of Alberta. Results support quantitative assessments and identify the root causes of project performance and ineffective field productivity problems in the heavy industry sector capital projects. Customized metrics produced from the data collected through a web-based survey instrument were used to quantitatively assess project performance in the following dimensions: cost, schedule, change, rework, safety, engineering and construction productivity and construction practices. The system enables the industry to measure project performance more accurately, get meaningful comparisons, while establishing credible norms specific to Alberta projects. Data analysis to identify the root cause of performance problems was conducted. The analysis of Alberta projects substantiated lessons of previous studies to create an improved awareness of the abilities of Alberta-based companies to manage their

  5. Project Management Life Cycle Models to Improve Management in High-rise Construction

    Science.gov (United States)

    Burmistrov, Andrey; Siniavina, Maria; Iliashenko, Oksana

    2018-03-01

    The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models) based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  6. Project Management Life Cycle Models to Improve Management in High-rise Construction

    Directory of Open Access Journals (Sweden)

    Burmistrov Andrey

    2018-01-01

    Full Text Available The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  7. Waste Management Project Quality Assurance Program Plan (QAPP)

    International Nuclear Information System (INIS)

    HORHOTA, M.J.

    2000-01-01

    The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence

  8. Quality Assurance Program Plan (QAPP) Waste Management Project

    Energy Technology Data Exchange (ETDEWEB)

    HORHOTA, M.J.

    2000-12-21

    The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence.

  9. The evolution of the project management

    Directory of Open Access Journals (Sweden)

    Catalin Drob

    2009-12-01

    Full Text Available Project management has appeared and developed based on scientific management theory during the '50s-'60s of the last century. After the 1990s of the last century, we can say that project management has truly become an independent discipline, which has a huge impact on the success or failure of companies which are engaged in major projects.

  10. Managing a big ground-based astronomy project: the Thirty Meter Telescope (TMT) project

    Science.gov (United States)

    Sanders, Gary H.

    2008-07-01

    TMT is a big science project and its scale is greater than previous ground-based optical/infrared telescope projects. This paper will describe the ideal "linear" project and how the TMT project departs from that ideal. The paper will describe the needed adaptations to successfully manage real world complexities. The progression from science requirements to a reference design, the development of a product-oriented Work Breakdown Structure (WBS) and an organization that parallels the WBS, the implementation of system engineering, requirements definition and the progression through Conceptual Design to Preliminary Design will be summarized. The development of a detailed cost estimate structured by the WBS, and the methodology of risk analysis to estimate contingency fund requirements will be summarized. Designing the project schedule defines the construction plan and, together with the cost model, provides the basis for executing the project guided by an earned value performance measurement system.

  11. Making sense of project management

    DEFF Research Database (Denmark)

    Kjærgaard, Annemette; Kautz, Karl; Nielsen, Peter Axel

    2007-01-01

    How can a software company make sense of project management when it becomes involved in software process improvement? In software development most research has an instrumental view of knowledge management thus neglecting what is probably the most important part of knowledge management namely making...... sense of practice by developers and project managers. Through an action case, we study the knowledge management processes in a Danish software company. We analyse the case through the lens of a theoretical framework. The theoretical framework focuses in particular on sensemaking, collective construed...... substantial insight which could not have been achieved through an instrumental perspective on knowledge management....

  12. WIPP Project Records Management Handbook

    International Nuclear Information System (INIS)

    1991-01-01

    The Waste Isolation Pilot Plant (WIPP) Records Management Handbook provides the WIPP Project Records Management personnel with a tool to use to fulfill the requirements of the WIPP Records Program and direct their actions in the important area of records management. The handbook describes the various project areas involved in records management, and how they function. The handbook provides the requirements for Record Coordinators and Master Record Center (MRC) personnel to follow in the normal course of file management, records scheduling, records turnover, records disposition, and records retrieval. More importantly, the handbook provides a single reference which encompasses the procedures set fourth in DOE Order 1324.2A, ''Records Disposition'' ASME NQA-1, ''Quality Assurance Program Requirements for Nuclear Facilities'' and DOE-AL 5700.6B, ''General Operations Quality Assurance.'' These documents dictate how an efficient system of records management will be achieved on the WIPP Project

  13. Integrated Risk Management Within NASA Programs/Projects

    Science.gov (United States)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  14. ALARA and work management

    International Nuclear Information System (INIS)

    Schieber, C.; Perin, M.; Saumon, P.

    1995-01-01

    At the request of Electricite de France (EDF) and Framatome, the Nuclear Protection Evaluation Centre (CEPN) developed a three-year research project, between 1991 and 1993, to evaluate the impact of various work management factors that can influence occupational exposures in nuclear power plants (NPPs) and to assess the effectiveness of protective actions implemented to reduce them. Three different categories of factors have been delineated: those linked to working conditions (such as ergonomic of work areas and protective suits), those characterizing the operators (qualification, experience level, motivation, etc.). In order to quantify the impact of these factors, a detailed survey was carried out in five French NPPs, focusing on three types of operations: primary valves maintenance, decontamination of reactor cavity, and specialized maintenance operations on the steam generator. This survey was augmented by a literature review on the influence of open-quotes hostileclose quotes environment on working conditions. Finally, a specific study was performed in order to quantify the impact of various types of protective suits used in French nuclear installations according to the type of work to be done. All of these factors have been included in a model aiming at quantifying the effectiveness of protection actions, both from dosimetric and economic point of views

  15. ALARA and work management

    Energy Technology Data Exchange (ETDEWEB)

    Schieber, C. [Centre d`etude sur l`Evaluation de la Protection dans le domaine Nucleaire, Fontenay-aux-Roses (France); Perin, M. [Environmental Radiation Protection and Security Dept., Saint-Denis (France); Saumon, P. [Framatome, Lyon (France)

    1995-03-01

    At the request of Electricite de France (EDF) and Framatome, the Nuclear Protection Evaluation Centre (CEPN) developed a three-year research project, between 1991 and 1993, to evaluate the impact of various work management factors that can influence occupational exposures in nuclear power plants (NPPs) and to assess the effectiveness of protective actions implemented to reduce them. Three different categories of factors have been delineated: those linked to working conditions (such as ergonomic of work areas and protective suits), those characterizing the operators (qualification, experience level, motivation, etc.). In order to quantify the impact of these factors, a detailed survey was carried out in five French NPPs, focusing on three types of operations: primary valves maintenance, decontamination of reactor cavity, and specialized maintenance operations on the steam generator. This survey was augmented by a literature review on the influence of {open_quotes}hostile{close_quotes} environment on working conditions. Finally, a specific study was performed in order to quantify the impact of various types of protective suits used in French nuclear installations according to the type of work to be done. All of these factors have been included in a model aiming at quantifying the effectiveness of protection actions, both from dosimetric and economic point of views.

  16. RISK MANAGEMENT APPROACHES AND PRACTICES IN IT PROJECTS

    Directory of Open Access Journals (Sweden)

    BRANDAS Claudiu

    2012-07-01

    Full Text Available Risk is identified in project management literature as an important factor influencing IT projects success, and it is relevant for both academic and practitionersn#8217; communities. The paper presents the past and current approaches to risk management in IT projects. The objective of this paper is to compare the different approaches and relate them to existing practices. Project management literature and practice have brought different approaches to risk management, and as a result, many projects ended in failure. We present how risk management is considered in the literature, and we compare the main two approaches: the evaluation approach and the management approach. The contingency approach does not consider risk management to be a specific process as it is an embedded process in the other project management processes. Then, we present the main practices in risk management. The methodology applied is based on documentary study review and analysis of the concepts used by the literature. We analyzed the literature published between 1978 and 2011 from the main journals for IT project management and found out that the essence of project management is risk management. The risk management practices have a considerable influence on stakeholdersn#8217; perception of project success. But, regardless of the chosen approach, a standard method for identifying, assessing, and responding to risks should be included in any project as this influences the outcome of the project.

  17. Day-to-day management of EU projects: Implementation of a local manager network to secure knowledge transfer

    Science.gov (United States)

    Hoffmann, Friederike; Meyer, Stefanie; de Vareilles, Mahaut

    2017-04-01

    In the past years there has been a strong push in Norway for increasing participation in the EU Framework Programmes for Research and Innovation. EU projects coordinated by the University of Bergen (UiB) usually receive management support from the central administration (mostly financial) in collaboration with a full- or part-time scientific project manager working on a fixed-term contract at the same institute as the project's principal scientist. With an increasing amount of granted EU projects, the number of scientific project managers employed across the whole university has also increased, and a need for coordination and professionalization of this service became obvious. Until recently, UiB had no unified structures and routines for training of newly recruited project managers, or for archiving and transferring routines and skills after the end of the project and the manager's employment contract. To overcome this administrative knowledge gap, the "Forum for scientific EU project managers at UiB" was founded in spring 2016 as an informal communication platform. Its purpose is to bring together current and previous scientific EU project managers from different disciplines to share their experiences. The main aim of the forum is to transfer and improve knowledge, skills and routines on effective management of EU funded projects, but also to function as a discussion forum where issues arising from handling international consortia can be reviewed. The group meets monthly and discusses current challenges from on-going EU projects as well as routines for specific project operation tasks. These routines are archived in an online best-practise guide which the group currently develops. The regular personal meetings are supplemented with an intense communication via a group mailing list and several individual mail- and phone-meetings. Since lessons learned during project implementation may improve future proposals, UiB research advisors for proposal support frequently

  18. Organizational structures of companies versus project management effectiveness

    Directory of Open Access Journals (Sweden)

    Joanna Haffer

    2012-12-01

    Full Text Available An organizational structure, indicated as one out of the four main organizational conditions supporting project management, has an essential meaning for project execution. This article, based on the research results, describes different organizational structures of project-orientated enterprises, enumerating their advantages and disadvantages, and reveals the influence of inter-organizational relations on project management effectiveness in enterprises operating in Poland. The results indicate that the more a character of inter-organizational relations is heading towards project structure, the higher project management effectiveness is. In the next sequence the project management processes are supported by strong matrix structures, whereas the worst outcomes are provided by functional structures. Simultaneously, it was concluded that project structures are conducive to high advancement of project management processes, and among them, especially project risk management processes as well as communication, time and cost management processes.

  19. Managing a sensitive project

    International Nuclear Information System (INIS)

    Etcheber, Pascal

    1998-01-01

    A 'sensitive' project needs to be managed differently from a 'normal' project. This statement might seem simple enough. However, it does not seem to be a simple task to prove it in twenty minutes. This paper is an attempt to share with the audience some of the experiences the company had dealing with sensitive projects. It describes what a sensitive project is, though of all people, the 'nuclear' should know. Then the common mistakes are described, that are made in the hoping that some personal experiences are recognised. Finally the company's strategy is shown, how we foster third party support and the main tools to be used. Ultimately, success is ensured by having a sufficient quantity of allies. A sensitive project does not die because it has too many opponents, but because it has too few allies. Finding and helping allies to act is the thrust of our activity. It enables sensitive projects which deserve to succeed to do so, where traditional management fails miserably

  20. Integrated management tool for controls software problems, requests and project tasking at SLAC

    International Nuclear Information System (INIS)

    Rogind, D.; Allen, W.; Colocho, W.; DeContreras, G.; Gordon, J.; Pandey, P.; Shoaee, H.

    2012-01-01

    The Accelerator Directorate (AD) Instrumentation and Controls (ICD) Software (SW) Department at SLAC, with its service center model, continuously receives engineering requests to design, build and support controls for accelerator systems lab-wide. Each customer request can vary in complexity from a small software engineering change to a major enhancement. SLAC's Accelerator Improvement Projects (AIPs), along with DOE Construction projects, also contribute heavily to the work load. The various customer requests and projects, paired with the ongoing operational maintenance and problem reports, place a demand on the department that consistently exceeds the capacity of available resources. A centralized repository - comprised of all requests, project tasks, and problems - available to physicists, operators, managers, and engineers alike, is essential to capture, communicate, prioritize, assign, schedule, track, and finally, commission all work components. The Software Department has recently integrated request / project tasking into SLAC's custom online problem tracking 'Comprehensive Accelerator Tool for Enhancing Reliability' (CATER) tool. This paper discusses the newly implemented software request management tool - the workload it helps to track, its structure, features, reports, work-flow and its many usages. (authors)

  1. Essentials of Project and Systems Engineering Management

    CERN Document Server

    Eisner, Howard S

    2008-01-01

    The Third Edition of Essentials of Project and Systems Engineering Management enables readers to manage the design, development, and engineering of systems effectively and efficiently. The book both defines and describes the essentials of project and systems engineering management and, moreover, shows the critical relationship and interconnection between project management and systems engineering. The author's comprehensive presentation has proven successful in enabling both engineers and project managers to understand their roles, collaborate, and quickly grasp and apply all the basic princip

  2. Ranking the Project Management Success Factors for Construction Project in South India

    Science.gov (United States)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  3. Compilation Of An Econometric Human Resource Efficiency Model For Project Management Best Practices

    Directory of Open Access Journals (Sweden)

    G. van Zyl

    2006-11-01

    Full Text Available The aim of the paper is to introduce a human resource efficiency model in order to rank the most important human resource driving forces for project management best practices. The results of the model will demonstrate how the human resource component of project management acts as the primary function to enhance organizational performance, codified through improved logical end-state programmes, work ethics and process contributions. Given the hypothesis that project management best practices involve significant human resource and organizational changes, one would reasonably expect this process to influence and resonate throughout all the dimensions of an organisation.

  4. Are project managers ready for the 21th challenges? A review of problem structuring methods for decision support

    Directory of Open Access Journals (Sweden)

    José Mateo

    2017-01-01

    Full Text Available Numerous contemporary problems that project managers face today can be considered as unstructured decision problems characterized by multiple actors and perspectives, incommensurable and/or conflicting objectives, and important intangibles. This work environment demands that project managers possess not only hard skills but also soft skills with the ability to take a management perspective and, above all, develop real leadership capabilities. In this paper, a family of problem structured methods for decision support aimed at assisting project managers in tackling complex problems are presented. Problem structured methods are a family of soft operations research methods for decision support that assist groups of diverse composition to agree a problem focus and make commitments to consequential action. Project management programs are challenged to implement these methodologies in such a way that it is organized around the key competences that a project manager needs in order to be more effective, work efficiently as members of interdisciplinary teams and successfully execute even a small project.

  5. An Approach for Implementation of Project Management Information Systems

    Science.gov (United States)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  6. Risk Management and Uncertainty in Infrastructure Projects

    DEFF Research Database (Denmark)

    Harty, Chris; Neerup Themsen, Tim; Tryggestad, Kjell

    2014-01-01

    The assumption that large complex projects should be managed in order to reduce uncertainty and increase predictability is not new. What is relatively new, however, is that uncertainty reduction can and should be obtained through formal risk management approaches. We question both assumptions...... by addressing a more fundamental question about the role of knowledge in current risk management practices. Inquiries into the predominant approaches to risk management in large infrastructure and construction projects reveal their assumptions about knowledge and we discuss the ramifications these have...... for project and construction management. Our argument and claim is that predominant risk management approaches tends to reinforce conventional ideas of project control whilst undermining other notions of value and relevance of built assets and project management process. These approaches fail to consider...

  7. Review of Time Management for the Research Reactor Project

    Energy Technology Data Exchange (ETDEWEB)

    Park, Kook-Nam; Park, Su-Jin; Choi, Min-Ho; Yoon, Hyung-Mo; Kim, Hyeonil [KAERI, Daejeon (Korea, Republic of); Lee, Eung-Jae [DAEWOO E and C, Seoul (Korea, Republic of)

    2016-05-15

    In this paper, the processes for the time management, which have actually been implemented for JRTR, are presented. In JRTR, a master schedule was submitted in December 2012 whereas the project was contracted in October 2010. The schedule includes fixing the Engineering Deliverable List (EDL), the list of equipment, the actual issue date, the results of Primavera, a piece of software to manage progress, the progress rate and the issuance of the schedule based on the Project level III. Afterwards JAEC approved to the extension of the schedule from 56 months to 70.5 months mainly due to late preparation of the Jordanian nuclear legislative system. The project schedule was updated up to the fifth revision to compensate the delay by recovering measures such as for design, purchase, construction, and finally the owner of the project, Jordanian Atomic Energy Commission (JAEC) approved in August 2014. Construction work, the prerequisite for commissioning stage A had been finished in February 2016, and commissioning stage A has been being performed.

  8. Review of Time Management for the Research Reactor Project

    International Nuclear Information System (INIS)

    Park, Kook-Nam; Park, Su-Jin; Choi, Min-Ho; Yoon, Hyung-Mo; Kim, Hyeonil; Lee, Eung-Jae

    2016-01-01

    In this paper, the processes for the time management, which have actually been implemented for JRTR, are presented. In JRTR, a master schedule was submitted in December 2012 whereas the project was contracted in October 2010. The schedule includes fixing the Engineering Deliverable List (EDL), the list of equipment, the actual issue date, the results of Primavera, a piece of software to manage progress, the progress rate and the issuance of the schedule based on the Project level III. Afterwards JAEC approved to the extension of the schedule from 56 months to 70.5 months mainly due to late preparation of the Jordanian nuclear legislative system. The project schedule was updated up to the fifth revision to compensate the delay by recovering measures such as for design, purchase, construction, and finally the owner of the project, Jordanian Atomic Energy Commission (JAEC) approved in August 2014. Construction work, the prerequisite for commissioning stage A had been finished in February 2016, and commissioning stage A has been being performed

  9. Software project management in a changing world

    CERN Document Server

    Ruhe, Günther

    2014-01-01

    By bringing together various current direc­tions, Software Project Management in a Changing World focuses on how people and organizations can make their processes more change-adaptive. The selected chapters closely correspond to the project management knowledge areas introduced by the Project Management Body of Knowledge, including its extension for managing software projects. The contributions are grouped into four parts, preceded by a general introduction. Part I "Fundamentals" provides in-depth insights into fundamental topics including resource allocation, cost estimation and risk manage

  10. Study On The Multi-Project Management Practices for Complex Investments

    Directory of Open Access Journals (Sweden)

    Mircea Sandru

    2015-11-01

    Full Text Available This paper highlights the results of a study carried out during the doctoral research in case of multi project Engineering, Procurement, Construction, Commissioning (EPCC investment types. The objective of this study was to improve the project portfolio management. The methodology used in the research presented in this paper is focused on the analysis of the authors related to the approaches debated in literature and theirs applicability in EPCC type investment programs. In this sense were analyzed 11 international projects in petrochemical and refinery field and also 7 investments in other different areas of chemical industry. The research highlighted that the management process of these investments can be improved trough the correct project integration, being able to provide a performing working environment able to sustain the management team in identifying the investment program criticalities and congestion points in order to be able to manage them in an efficient manner in order to assure the reach of the investment goal. Having as consequence the possibility to significant reduction of execution period, up to 16% and in the mean time also the delays related risks through a more efficient investment managerial act.

  11. Project Management Using Modern Guidance, Navigation and Control Theory

    Science.gov (United States)

    Hill, Terry R.

    2011-01-01

    Implementing guidance, navigation, and control (GN&C) theory principles and applying them to the human element of project management and control is not a new concept. As both the literature on the subject and the real-world applications are neither readily available nor comprehensive with regard to how such principles might be applied, this paper has been written to educate the project manager on the "laws of physics" of his or her project (not to teach a GN&C engineer how to become a project manager) and to provide an intuitive, mathematical explanation as to the control and behavior of projects. This paper will also address how the fundamental principles of modern GN&C were applied to the National Aeronautics and Space Administration's (NASA) Constellation Program (CxP) space suit project, ensuring the project was managed within cost, schedule, and budget. A project that is akin to a physical system can be modeled and managed using the same over arching principles of GN&C that would be used if that project were a complex vehicle, a complex system(s), or complex software with time-varying processes (at times nonlinear) containing multiple data inputs of varying accuracy and a range of operating points. The classic GN&C theory approach could thus be applied to small, well-defined projects; yet when working with larger, multiyear projects necessitating multiple organizational structures, numerous external influences, and a multitude of diverse resources, modern GN&C principles are required to model and manage the project. The fundamental principles of a GN&C system incorporate these basic concepts: State, Behavior, Feedback Control, Navigation, Guidance and Planning Logic systems. The State of a system defines the aspects of the system that can change over time; e.g., position, velocity, acceleration, coordinate-based attitude, and temperature, etc. The Behavior of the system focuses more on what changes are possible within the system; this is denoted in the state

  12. ADP Analysis project for the Human Resources Management Division

    Science.gov (United States)

    Tureman, Robert L., Jr.

    1993-01-01

    The ADP (Automated Data Processing) Analysis Project was conducted for the Human Resources Management Division (HRMD) of NASA's Langley Research Center. The three major areas of work in the project were computer support, automated inventory analysis, and an ADP study for the Division. The goal of the computer support work was to determine automation needs of Division personnel and help them solve computing problems. The goal of automated inventory analysis was to find a way to analyze installed software and usage on a Macintosh. Finally, the ADP functional systems study for the Division was designed to assess future HRMD needs concerning ADP organization and activities.

  13. [The organizational projects management led by head nurses: qualitative study from an educational device.

    Science.gov (United States)

    Dujardin, Pierre-Philippe; Reverdy, Thomas; Valette, Annick; François, Patrice

    2017-09-01

    The work of operational coordination led by head nurses (HN) is more known than their abilities to change work organization, as well as, care practices. In this article, we explore organizational projects led by HN. Depending on the situations, they may concern their health care team or involve institutional hierarchy or other teams. We rely on an intervention study, which enabled us to follow 17 organizational projects led by HN for one year. The results of this study highlight as the main condition for success, the HN' efforts to enable mutual understanding with other interested actors. Managers, who engage their health care team in the development of solutions, bring sustainable results. When problems involve the hierarchy, the managers focus on the development of personal relationships. When problems involve other departments, which they depend on, then they engage themselves into integrative negotiations. These results invite to open discussion about work organization and to formalize organizational projects. This intervention study also points out that work - training at operational audit is relevant for HN. Activé par Editorial Manager® et ProduXion.

  14. Project Management 2027; The Future of Project Management

    NARCIS (Netherlands)

    Drs. A.J.G. Silvius

    2008-01-01

    This paper describes a study into the expected development of the competences op the project manager in the year 2027. The study was performed amongst the members of IPMA-Netherlands during the summer of 2007. In the study the 46 competences of the International Competence Baseline 3 (ICB 3) were

  15. Project Management in Real Time: A Service-Learning Project

    Science.gov (United States)

    Larson, Erik; Drexler, John A., Jr.

    2010-01-01

    This article describes a service-learning assignment for a project management course. It is designed to facilitate hands-on student learning of both the technical and the interpersonal aspects of project management, and it involves student engagement with real customers and real stakeholders in the creation of real events with real outcomes. As…

  16. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  17. Project Management Personnel Competencies Evaluation

    Directory of Open Access Journals (Sweden)

    Paul POCATILU

    2006-01-01

    Full Text Available An important factor for the success management of IT projects is the human resource. People involved in the project management process have to be evaluated. In order to do that, same criteria has to be specified. This paper describes some aspects regarding the personnel evaluation.

  18. Open Source Approach to Project Management Tools

    Directory of Open Access Journals (Sweden)

    Romeo MARGEA

    2011-01-01

    Full Text Available Managing large projects involving different groups of people and complex tasks can be challenging. The solution is to use Project management software, which allows a more efficient management of projects. However, famous project management systems can be costly and may require expensive custom servers. Even if free software is not as complex as Microsoft Project, is noteworthy to think that not all projects need all the features, amenities and power of such systems. There are free and open source software alternatives that meet the needs of most projects, and that allow Web access based on different platforms and locations. A starting stage in adopting an OSS in-house is finding and identifying existing open source solution. In this paper we present an overview of Open Source Project Management Software (OSPMS based on articles, reviews, books and developers’ web sites, about those that seem to be the most popular software in this category.

  19. Application of project management methodology in design management of nuclear safety related structure

    International Nuclear Information System (INIS)

    Chen Mao

    2004-01-01

    This paper focuses on the application of project management methodology in the design management of Nuclear Safety Related Structure (NSRS), considering the design management features of its civil construction. Based on the experiences from the management of several projects, the project management triangle is proposed to be used in the management, to well treat the position of design interface in the project management. Some other management methods are also proposed

  20. Agile project management managing for success

    CERN Document Server

    Crowder, James A

    2015-01-01

    Management and enables them to deal with the demands and complexities of modern, agile systems/software/hardware development teams. The book examines the project/program manager beyond the concepts of leadership and aims to connect to employees' sense of identity. The text examines human psychological concepts such as "locus of control," which will help the manager understand their team members' view and how best to manage their "world" contributions. The authors cover new management tools and philosophies for agile systems/software/hardware development teams, with a specific focus on how this

  1. Project manager attributes influencing project success in the South ...

    African Journals Online (AJOL)

    success criteria for building projects in Ghana and concluded that the “current and ... qualifications, profession, leadership style and project team ... and expectations of project management competence between ... 1.d. Sense of teamwork ...

  2. The ComSoc guide to managing telecommunications projects

    CERN Document Server

    Desmond, Celia

    2010-01-01

    "This pocket guide provides an overview of the telecommunications environment as it has evolved over the past few years, illustrating the need for project management, the significance of project success to the companies, and the application of key project management processes within the telecom environment. Topics covered include: scope management, time management, cost management, procurement management, risk management, communications, quality, human resources, and Integration. It offers professionals a brief and accessible guide to managing telecommunication projects in the 21st century"--

  3. Project management for economical nuclear energy

    International Nuclear Information System (INIS)

    Majerle, P.P.

    2005-01-01

    The price of electricity is significantly influenced by the cost of the initial generation asset. The cost of the initial nuclear generation asset is significantly influenced by the design and construction duration. Negative variations in the cost and duration of actual design and construction have historically impacted the early relative economics of nuclear power generation. Successful management of plant design information will mitigate the risks of the design and construction of future nuclear plants. Information management tools that can model the integrated delivery of large complex projects enable the project owners to accurately evaluate project progress, as well as the economic impact of regulatory, political, or market activities not anticipated in the project execution plan. Significant differences exist in the electrical energy markets, project delivery models, and fuel availability between continents and countries. However, each market and project delivery model is challenged by the need to produce economical electrical energy. The information management system presented in this paper provides a means to capture in a single integrated computerized database the design information developed during plant design, procurement, and construction and to allow this information to be updated and retrieved in real time by all project participants. Utilization of the information management system described herein will enable diverse project teams to rapidly and reliably input, share, and retrieve power plant information, thereby supporting project management's goal to make good on its commitment to the economic promise of tomorrow's nuclear electrical power generation by achieving cost-effective construction. (authors)

  4. The Challenges and Enhancing Opportunities of Global Project Management: Evidence from Chinese and Dutch Cross-Cultural Project Management

    OpenAIRE

    Zhang, Ying; Marquis, Christopher G; Filippov, Sergey; Haasnoot, Henk-Jan; van der Steen, Martijn

    2015-01-01

    This study investigates the role of national and organisational culture in day-to-day activities of multinational project teams, specifically focusing on differences between Chinese and Dutch project managers. We rely on fieldwork observation and interviews with representatives from a diverse set of organizations in China and the Netherlands. Analyses focus on the impact of cultural differences on five project management processes – (1) project planning, (2) cost and quality management, (3) r...

  5. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    Science.gov (United States)

    Raiman, Laura B.

    1992-12-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  6. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    Science.gov (United States)

    Raiman, Laura B.

    1992-01-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  7. Project management at a university

    Science.gov (United States)

    Eaton, Joel A.

    2006-06-01

    Managing instrumentation projects, large or small, involves a number of common challenges-defining what is needed, desiging a system to provide it, producing it in an economical way, and putting it into service expeditiously. Doing these things in a university environoment provides unique challenges and opportunities not obtaining in the environment of large projects at NASA or national labs. I address this topic from the viewpoint of knowledge of two such projects, the development of OAO-2 at the University of Wisconsin and the relocation of Fairborn Observatory to the Patagonia Mountains in Arizona, as well as my own developemnt of the Tennessee State 2-m Automatic Spectroscopic Telescope. For the university environment, I argue for a more traditional management style that relies on more informal techniques than those used in large-scale projects conducted by big bureaucratic institutions. This style identifies what tasks are really necessary and eliminates as much wasteful overhead as possible. I discuss many of the formalities used in project management, such as formal reviews (PDR, CDR, etc.) and Gantt charts, and propose other ways of acheving the same results more effectively. The university environment acutely requires getting the right people to do the project, both in terms of their individual personalities, motivation, and technical skills but also in terms of their ability to get on with one another. Two critical challenges confronting those doing such projects in universities are 1) keeping the contractors on task (the major challenge to anyone doing project management) and 2) dealing with the purchasing systems in such institutions.

  8. The IT project manager competencies that impact project success – A qualitative research

    Directory of Open Access Journals (Sweden)

    Cíntia Cristina Silva de Araújo

    2015-07-01

    Full Text Available Since there is a lack of studies about the relationship of IT project manager competencies and project success, this paper will address the following research question: Which competencies should IT project managers develop in order to achieve success in IT projects? To answer this question, we conducted a qualitative research with an exploratory approach. To collect data, twelve (12 in-depth interviews were done with Brazilian project managers from different companies from several business sectors. The analysis results pointed out that for our respondents the most needed category of competencies are team management, business domain knowledge,  communication, project management and people skills. As other authors have affirmed, technical skills were considered to be less relevant to project success than interpersonal and intrapersonal competencies.

  9. Life project of adolescents, a product of socio-educational work of school

    Directory of Open Access Journals (Sweden)

    Maibel Rebollar-Ferrer

    2016-10-01

    Full Text Available The improvement of formative work, through a life orientation that is characterized by the correspondence of aspirations or individual goals, potentials and social demands is a challenge to Junior high school in the design and implementation of sócio–educative system of actions, that led by principals and teachers, integrates socializing agents, in order to prepare adolescents in managing a developmental life project to ensure their integration into dynamic and complex society. This research paper nowadays, from the pedagogical, psychological and sociological references, a conceptual basis for understanding adolescents’ life project as an expression of integral formation and the product of social and educational work of school.

  10. Construction project management handbook.

    Science.gov (United States)

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  11. Projects management in organization on the selected example

    OpenAIRE

    A. Kania; M. Spilka; S. Griner

    2013-01-01

    Purpose: In this paper stages of project management taking into consideration many useful tools and methods were presented. The quality management in the project, the risk estimation, costs of the project realization and many others were discussed. The analysis of project management of an element using in an automotive industry was carried out.Design/methodology/approach: In this article classification of the projects was presented. The stages of project management and relations among them we...

  12. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  13. The Stripa project in a Swedish waste management perspective

    International Nuclear Information System (INIS)

    Bjurstroem, S.

    1994-01-01

    This publication deals with the Swedish nuclear waste management program till the 60s; it also consists of a presentation of the Stripa Project, that played a important role in the research development work in Sweden. This project was carried out in collaboration with the United States, and an international participation was organized. The primary goals of this project were to develop scientific techniques to characterize a granite rock. The issues of such studies were of common concern to many countries that had research and development programs on the disposal of high-level radioactive wastes. (TEC)

  14. Project Management – Multi-perspective Leadership

    DEFF Research Database (Denmark)

    Riis, Eva

    2014-01-01

    Project Management – Multi-perspective Leadership” af Hans Mikkelsen og Jens Ove Riis - anmeldelse......”Project Management – Multi-perspective Leadership” af Hans Mikkelsen og Jens Ove Riis - anmeldelse...

  15. Improvement of Construction Project Management Processes

    Directory of Open Access Journals (Sweden)

    Nazarko, J.

    2017-07-01

    Full Text Available The common denominator of the five papers published in the current edition of the Journal of Engineering, Project, and Production Management is the improvement of construction project management processes for effective use of resources. Execution of proper project management processes is widely recognized as a key success factor influencing likelihood of project success (Alleman, 2014. It is noticeable that four out of five papers in this issue of the Journal are authored or co-authored by Iranian researchers from the same Institute but their conclusions bear importance that cannot be limited to the authors’ region.

  16. Open Source and Proprietary Project Management Tools for SMEs.

    Directory of Open Access Journals (Sweden)

    Veronika Abramova

    2017-05-01

    Full Text Available The dimensional growth and increasing difficulty in project management promoted the development of different tools that serve to facilitate project management and track project schedule, resources and overall progress. These tools offer a variety of features, from task and time management, up to integrated CRM (Customer Relationship Management and ERP (Enterprise Resource Planning modules. Currently, a large number of project management software is available, to assist project team during the entire project lifecycle. We present the main differences between open source and proprietary project management tools and how those could be important for SMEs, describing the key features and how those can assist the project manager and the development team. In this paper, we analyse four open-source project management tools: OpenProject, ProjectLibre, Redmine, LibrePlan and four proprietary tools: Bitrix24, JIRA, Microsoft Project and Asana.

  17. The One-Page Project Manager Comunicate and Manage Any Project With a Single Sheet of Paper

    CERN Document Server

    Campbell, Clark A

    2007-01-01

    The One-Page Project Manager shows you how to boil down any project into a simple, one-page document that can be used to communicate all essential details to upper management, other departments, suppliers, and audiences. This practical guide will save time and effort, helping you identify the vital parts of a project and communicate those parts and duties to other team members.

  18. Researchers' experience with project management in health and medical research: Results from a post-project review

    Science.gov (United States)

    2011-01-01

    Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721

  19. Project management in fossil plant construction: A perspective for the Nineties

    International Nuclear Information System (INIS)

    Bhatia, N.K.

    1991-01-01

    The continuing growth in demand for electric power, and the reluctance of electric utility management to commit to new capacity additions has created a potential for somewhat hectic activity in the fossil power plant construction market. With the changing matrix of power plant types and ownerships, the project manager is called upon to deliver a complex product with exacting contract requirements: lump sum contracts, competitive pricing, short schedules, and performance guarantees. A shortage of experienced professionals in the ranks of the owners, engineers, contractors, and suppliers magnifies the challenge. Plant replication, automation, creative management of vendors and contractors, and participative management of the work force will be key elements of successful projects. Partnering between the clients and the engineers-constructors will be an interesting new relationship model

  20. Dynamic simulation applied to the socio-environmental management in projects of concentrated infrastructure

    International Nuclear Information System (INIS)

    Diaz E, Mauricio; Pena Z, Gloria Elena

    2004-01-01

    This work presents a theoretical and methodological approach to system dynamics utilization to contribute in the comprehension and handle of complexly of management challenges what appears in design, construction and operation phases in concentrate infrastructure projects like as ports, big dams and industrial parks. The localization of this kind of projects generates socio environmental impacts in their influence zones, what requires a strategically management from enterprise owners, not only for to comply with current environmental laws but also ensure social viability of their projects

  1. Information management for decommissioning projects

    International Nuclear Information System (INIS)

    LeClair, A.N.; Lemire, D.S.

    2011-01-01

    This paper explores the importance of records and information management for decommissioning projects. Key decommissioning information and elements of a sound information management strategy are identified. Various knowledge management strategies and tools are discussed as opportunities for leveraging decommissioning information. The paper also examines the implementation of Atomic Energy of Canada Limited's (AECL) strategy for the long term preservation of decommissioning information, and its initiatives in leveraging of information with the application of several knowledge management strategies and tools. The implementation of AECL's strategy illustrates common as well as unique information and knowledge management challenges and opportunities for decommissioning projects. (author)

  2. The Management of Projects and Product Experimentation

    DEFF Research Database (Denmark)

    Lorenzen, Mark; Frederiksen, Lars

    2005-01-01

    The paper analyses management of product innovation in project-based industries, offering a view on management not only of firms, but also of markets. It first argues that projects are prominent in industries where the nature of consumer demand means that product innovation takes place...... as experimentation. Then, the paper argues that if skills needed for projects are very diverse and projects are complex, there are few internal managerial economies of projects, and the scope for management then transcends the boundaries of firms. In these cases, markets become organized in combinations of people......, contracts, and other institutions, in order to facilitate the coordination of market-based projects. While contracts play a role, a continuous, active role of knowledgeable managers (leaders and boundary spanners) is also often necessary. Such managers --- and thus (core parts of) whole industries...

  3. 7 CFR 3560.102 - Housing project management.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Housing project management. 3560.102 Section 3560.102... § 3560.102 Housing project management. (a) General. Borrowers hold final responsibility for housing project management and must ensure that operations comply with the terms of all loan or grant documents...

  4. Managing regional innovation strategy projects

    OpenAIRE

    Wolf, Patricia; Hanisch, Christoph

    2014-01-01

    This paper presents a qualitative interview study with 28 RIS project managers that aimed at understanding whether or not this is true in the context of regional innovation and what the specifics of managing regional innovation projects are. In taking up a recent claim for policy intervention studies which allow to “derive precise suggestions for their design and management”.  The study investigated the interrelation between the agility of the management approach and the achievements of RIS p...

  5. A project management system for the X-29A flight test program

    Science.gov (United States)

    Stewart, J. F.; Bauer, C. A.

    1983-01-01

    The project-management system developed for NASA's participation in the X-29A aircraft development program is characterized from a theoretical perspective, as an example of a system appropriate to advanced, highly integrated technology projects. System-control theory is applied to the analysis of classical project-management techniques and structures, which are found to be of closed-loop multivariable type; and the effects of increasing project complexity and integration are evaluated. The importance of information flow, sampling frequency, information holding, and delays is stressed. The X-29A system is developed in four stages: establishment of overall objectives and requirements, determination of information processes (block diagrams) definition of personnel functional roles and relationships, and development of a detailed work-breakdown structure. The resulting system is shown to require a greater information flow to management than conventional methods. Sample block diagrams are provided.

  6. Fast Flux Test Facility, Sodium Storage Facility project-specific project management plan

    International Nuclear Information System (INIS)

    Shank, D.R.

    1994-01-01

    This Project-Specific Project Management Plan describes the project management methods and controls used by the WHC Projects Department to manage Project 03-F-031. The Sodium Storage Facility provides for storage of the 260,000 gallons of sodium presently in the FFTF Plant. The facility will accept the molten sodium transferred from the FFTF sodium systems, and store the sodium in a solid state under an inert cover gas until such time as a Sodium Reaction Facility is available for final disposal of the sodium

  7. Fast Flux Test Facility, Sodium Storage Facility project-specific project management plan

    Energy Technology Data Exchange (ETDEWEB)

    Shank, D.R.

    1994-12-29

    This Project-Specific Project Management Plan describes the project management methods and controls used by the WHC Projects Department to manage Project 03-F-031. The Sodium Storage Facility provides for storage of the 260,000 gallons of sodium presently in the FFTF Plant. The facility will accept the molten sodium transferred from the FFTF sodium systems, and store the sodium in a solid state under an inert cover gas until such time as a Sodium Reaction Facility is available for final disposal of the sodium.

  8. 43 CFR 418.29 - Project management.

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to be...

  9. Project Execution Plan, Waste Management Division, Nevada Operations Office, U.S. Department of Energy, April 2000

    International Nuclear Information System (INIS)

    2000-01-01

    This plan addresses project activities encompassed by the U.S. Department of Energy/Nevada Operations Office Waste Management Division and conforms to the requirements contained in the ''Life Cycle Asset Management,'' U.S. Department of Energy Order O430.1A; the Joint Program Office Policy on Project Management in Support of DOE Order O430.1, and the Project Execution and Engineering Management Planning Guide. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the state of Nevada; and traditional project management philosophies such as the development of life cycle costs, schedules, and work scope; identification of roles and responsibilities; and baseline management and controls

  10. BASIC ACTUAL AND EFFECTIVENESS OF LEADERSHIP STYLES OF CONSTRUCTION PROJECT MANAGERS IN SURABAYA

    Directory of Open Access Journals (Sweden)

    Andi Andi

    2004-01-01

    Full Text Available Leading is one of the most important facets in managing construction projects, and behaving as an effective leader is a vital project manager’s responsibility to ensure that work efforts of other persons are directed toward the accomplishment of organizational objectives. This paper aims to determine basic and actual leadership styles of construction project managers in Surabaya. The effectiveness of the actual leadership style is also examined. To accomplish the objective, the paper first briefly reviews the ways in which leadership is approached. Data were then collected through an empirical survey to 46 project managers, taking Fiedler and Hersey-Blanchard’s models as the point of departure. The results indicate that the basic leadership of project managers in Surabaya falls slightly on task-oriented behavior. Meanwhile selling is the most common style used as actual leadership in practice. The paper discusses the effectiveness of the styles adopted and situational variables affecting.

  11. Changing Pedagogical Means in Project Management

    DEFF Research Database (Denmark)

    Thorsteinsson, Uffe

    1998-01-01

    Presentation of two parts in a new concept for changing education in a university course in project management. First part concern running the couse as a project. Second part concern integrated use of Internet.......Presentation of two parts in a new concept for changing education in a university course in project management. First part concern running the couse as a project. Second part concern integrated use of Internet....

  12. Effective Safety Management in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.

  13. Principles of project management

    Science.gov (United States)

    1982-01-01

    The basic principles of project management as practiced by NASA management personnel are presented. These principles are given as ground rules and guidelines to be used in the performance of research, development, construction or operational assignments.

  14. IPMA STANDARD ELEMENTS AND FEEDBACK IN PROJECT MANAGEMENT TEACHING

    Directory of Open Access Journals (Sweden)

    BARTOŠKA, Jan

    2011-09-01

    Full Text Available The paper proposes the concept of project management teaching including the International Project Management Association (IPMA standard. The concept of teaching is theoretical and derives from the notion of competence, which the IPMA standard is based on. The paper presents a brief description of the IPMA standard and endeavours to define the notion of competence. The competence is worked with in respect to hierarchical recognition. The proposed teaching concept works with the concepts of information, knowledge and skills. The teaching proposal stems from the structure and contents of the IPMA standard elements. Furthermore, the paper elaborates the issue of embedding the elements of the IPMA standard competences into training courses. In the article, the eye of the IPMA competences is further enhanced with possible training courses and specialist areas in which the standard elements can thematically be included. The paper states that the competence elements and training courses cross one another and overlap in a manifold way. The authors also propose a way which could verify into what extent the students have actually acquired taught IPMA competence elements. The paper contains the proposal of feedback quantification for the IPMA standard and project management teaching. The results of the paper can be used as a starting premise for future research. Both the verification proposal and the embedding of the elements into teaching are derived from on-going academic experience of the authors of the article.

  15. Interdisciplinary Problem Oriented Project Work

    DEFF Research Database (Denmark)

    Blomhøj, Morten; Kjeldsen, Tinne Hoff

    2018-01-01

    In this chapter, we analyze the problem oriented project work practiced at the Bachelor Study Program in Natural Science (Nat Bach) at Roskilde University (RU) as a learning environment for developing students’ mathematical modelling competence. The projects are conducted in a rather sophisticated...... and radical learning environment grounded on the four pedagogical key principles of, problem orientation, participant directed group work, interdisciplinarity and exemplarity. We illustrate and discuss the interplay between the aim of developing the students’ modelling competence on the one hand...

  16. Traditional Project Management and the Visual Workplace Environment to Improve Project Success

    Science.gov (United States)

    Fichera, Christopher E.

    2016-01-01

    A majority of large IT projects fail to meet scheduled deadlines, are over budget and do not satisfy the end user. Many projects fail in spite of utilizing traditional project management techniques. Research of project management has not identified the use of a visual workspace as a feature affecting or influencing the success of a project during…

  17. Program management plan for the Molten Salt Reactor Experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-09-01

    The primary mission of the Molten Salt Reactor Experiment (MSRE) Remediation Project is to effectively implement the risk-reduction strategies and technical plans to stabilize and prevent further migration of uranium within the MSRE facility, remove the uranium and fuel salts from the system, and dispose of the fuel and flush salts by storage in appropriate depositories to bring the facility to a surveillance and maintenance condition before decontamination and decommissioning. This Project Management Plan (PMP) for the MSRE Remediation Project details project purpose; technical objectives, milestones, and cost objectives; work plan; work breakdown structure (WBS); schedule; management organization and responsibilities; project management performance measurement planning, and control; conduct of operations; configuration management; environmental, safety, and health compliance; quality assurance; operational readiness reviews; and training

  18. Program management plan for the Molten Salt Reactor Experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    The primary mission of the Molten Salt Reactor Experiment (MSRE) Remediation Project is to effectively implement the risk-reduction strategies and technical plans to stabilize and prevent further migration of uranium within the MSRE facility, remove the uranium and fuel salts from the system, and dispose of the fuel and flush salts by storage in appropriate depositories to bring the facility to a surveillance and maintenance condition before decontamination and decommissioning. This Project Management Plan (PMP) for the MSRE Remediation Project details project purpose; technical objectives, milestones, and cost objectives; work plan; work breakdown structure (WBS); schedule; management organization and responsibilities; project management performance measurement planning, and control; conduct of operations; configuration management; environmental, safety, and health compliance; quality assurance; operational readiness reviews; and training.

  19. The Future of Project Management in Technical Communication

    DEFF Research Database (Denmark)

    Kampf, Constance

    2006-01-01

    Project Management increasing shapes workplace communication, especially when technical commuicators participate in cross-disciplinary development teams. This paper looks at the future of project management in technical communication and argues for a communicative approach to project management...... for technical communication students. The Project Management course in the International Bachelor Program of Marketing and Management Communication at the Aarhus School of Business is described, and the implications fortechnical communication curricula are discussed....

  20. Project management in crisis situations

    Directory of Open Access Journals (Sweden)

    Agnieszka Goździewska-Nowicka

    2017-05-01

    Full Text Available In today’s methodologies of project management attention is increasingly paid to the crises-related issues. Modern economy and the turbulent environment cause that an emergingcrisis can pose a serious threat to the implementation of any undertaking. This article focuses on the presentation of the conditions and causes of crisis situations, the essence of projects, and their effective management. The major objective of the paper, however, is to demonstrate how companies implementing projects cope with the occurrence of a crisis situation.

  1. Managing complex industrial change through projects

    OpenAIRE

    Perotti , Clément; Minel , Stéphanie; Benoit , Roussel; Jean , Renaud

    2010-01-01

    International audience; This paper proposes some elements showing that project is an appropriate way to manage organizational change, and that an individual change occurs during these phases. We suggest that project team should manage individual change in the framework of project for three main reasons. First, being at the crossroad of strategic and operational levels, project team is in the right position in organisation to "translate" organizational change to individuals, and vice-versa. Se...

  2. A New Tool for Effective and Efficient Project Management

    Energy Technology Data Exchange (ETDEWEB)

    Willett, Jesse A [Washington State Univ., Pullman, WA (United States)

    2011-12-01

    Organizations routinely handle thousands of projects per year, and it is difficult to manage all these projects concurrently. Too often, projects do not get the attention they need when they need it. Management inattention can lead to late projects or projects with less than desirable content and/or deliverables. This paper discusses the application of Visual Project Management (VPM) as a method to track and manage projects. The VPM approach proved to be a powerful management tool without the overhead and restrictions of traditional management methods.

  3. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  4. Systems approach to project risk management

    Energy Technology Data Exchange (ETDEWEB)

    Kindinger, J. P. (John P.)

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  5. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    Science.gov (United States)

    Alagba, Tonye J.

    Oil and gas drilling projects are the primary means by which oil companies recover large volumes of commercially available hydrocarbons from deep reservoirs. These types of projects are complex in nature, involving management of multiple stakeholder interfaces, multidisciplinary personnel, complex contractor relationships, and turbulent environmental and market conditions, necessitating the application of proven project management best practices and critical success factors (CSFs) to achieve success. Although there is some practitioner oriented literature on project management CSFs for drilling projects, none of these is based on empirical evidence, from research. In addition, the literature has reported alarming rates of oil and gas drilling project failure, which is attributable not to technical factors, but to failure of project management. The aim of this quantitative correlational study therefore, was to discover an empirically verified list of project management CSFs, which consistent application leads to successful implementation of oil and gas drilling projects. The study collected survey data online, from a random sample of 127 oil and gas drilling personnel who were members of LinkedIn's online community "Drilling Supervisors, Managers, and Engineers". The results of the study indicated that 10 project management factors are individually related to project success of oil and gas drilling projects. These 10 CSFs are namely; Project mission, Top management support, Project schedule/plan, Client consultation, Personnel, Technical tasks, Client acceptance, Monitoring and feedback, Communication, and Troubleshooting. In addition, the study found that the relationships between the 10 CSFs and drilling project success is unaffected by participant and project demographics---role of project personnel, and project location. The significance of these findings are both practical, and theoretical. Practically, application of an empirically verified CSFs list to oil

  6. Teaching Project Management On-Line: Lessons Learned from MOOCs

    Science.gov (United States)

    Falcao, Rita; Fernandes, Luis

    2016-01-01

    Creating a course for teaching project management online in a full online distance-learning environment was a challenge. Working with adult learners from different continents that want to complete a Master degree was an additional challenge. This paper describes how different MOOCs were used to learn about teaching -(meta) e-learning. MOOCs…

  7. ALARA database value in future outage work planning and dose management

    International Nuclear Information System (INIS)

    Miller, D.W.; Green, W.H.

    1995-01-01

    ALARA database encompassing job-specific duration and man-rem plant specific information over three refueling outages represents an invaluable tool for the outage work planner and ALARA engineer. This paper describes dose-management trends emerging based on analysis of three refueling outages at Clinton Power Station. Conclusions reached based on hard data available from a relational database dose-tracking system is a valuable tool for planning of future outage work. The system's ability to identify key problem areas during a refueling outage is improving as more outage comparative data becomes available. Trends over a three outage period are identified in this paper in the categories of number and type of radiation work permits implemented, duration of jobs, projected vs. actual dose rates in work areas, and accuracy of outage person-rem projection. The value of the database in projecting 1 and 5 year station person-rem estimates is discussed

  8. ALARA database value in future outage work planning and dose management

    Energy Technology Data Exchange (ETDEWEB)

    Miller, D.W.; Green, W.H. [Clinton Power Station Illinois Power Co., IL (United States)

    1995-03-01

    ALARA database encompassing job-specific duration and man-rem plant specific information over three refueling outages represents an invaluable tool for the outage work planner and ALARA engineer. This paper describes dose-management trends emerging based on analysis of three refueling outages at Clinton Power Station. Conclusions reached based on hard data available from a relational database dose-tracking system is a valuable tool for planning of future outage work. The system`s ability to identify key problem areas during a refueling outage is improving as more outage comparative data becomes available. Trends over a three outage period are identified in this paper in the categories of number and type of radiation work permits implemented, duration of jobs, projected vs. actual dose rates in work areas, and accuracy of outage person-rem projection. The value of the database in projecting 1 and 5 year station person-rem estimates is discussed.

  9. Project Management Performance Drivers

    OpenAIRE

    Ra’ad, Mohammed A.; Najdawi, Mohammad K.

    2010-01-01

    The practice of project management has gained enormous importance over the past several years in various business industries. “In industries as diverse as pharmaceuticals, software, and aerospace, projects drive business” (Wheatley). This gain of importance can be attributed to the magnitude of the impact project performance results in terms of time, cost, and scope have over the project performing entity. “On the basis of data released by the Bureau of Economic Analysis, part of the US De...

  10. ORGANIZATION OF FUTURE ENGINEERS' PROJECT-BASED LEARNING WHEN STUDYING THE PROJECT MANAGEMENT METHODOLOGY

    Directory of Open Access Journals (Sweden)

    Halyna V. Lutsenko

    2015-02-01

    Full Text Available The peculiarities of modern world experience of implementation of project-based learning in engineering education have been considered. The potential role and place of projects in learning activity have been analyzed. The methodology of organization of project-based activity of engineering students when studying the project management methodology and computer systems of project management has been proposed. The requirements to documentation and actual results of students' projects have been described in detail. The requirements to computer-aided systems of project management developed by using Microsoft Project in the scope of diary scheduling and resources planning have been formulated.

  11. Finance and supply management project execution plan

    Energy Technology Data Exchange (ETDEWEB)

    BENNION, S.I.

    1999-02-10

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  12. Pointing the Way to the Future of Project Management: How the Past and Present Point Towards Project Management's Future

    National Research Council Canada - National Science Library

    Ballister, Robert

    2003-01-01

    .... The lessons learned from those projects, coupled with a look at project management history in general, will be checked against a current project management theory to determine if the focus of today's...

  13. Competitiveness in organizational integrated computer system project management

    Directory of Open Access Journals (Sweden)

    Zenovic GHERASIM

    2010-06-01

    Full Text Available The organizational integrated computer system project management aims at achieving competitiveness by unitary, connected and personalised treatment of the requirements for this type of projects, along with the adequate application of all the basic management, administration and project planning principles, as well as of the basic concepts of the organisational information management development. The paper presents some aspects of organizational computer systems project management competitiveness with the specific reference to some Romanian companies’ projects.

  14. Project managing your simulator DCS upgrade

    International Nuclear Information System (INIS)

    Carr, S.

    2006-01-01

    The intention of this paper is to provide helpful information and tips for the purchaser with regard to the project management of a DCS upgrade for an existing nuclear power station operator-training simulator. This paper was written shortly after STS Powergen completed two nuclear power station simulator DCS projects in the USA. Areas covered by this paper are: - Contractual documents and arrangements; - Licence and Escrow agreements; - Liquidated damages; - Project management; - Project schedules and resources; - Monitoring progress; - Defect reporting; - DCS automation code; - Access to proprietary information; - Tips for project meetings; - Testing; - Cultural issues; - Training

  15. Agile Project Portfolio Management

    DEFF Research Database (Denmark)

    Andersen, Jesper Rank; Riis, Jens Ove; Mikkelsen, Hans

    2005-01-01

    This paper will provide a preliminary introduction to the application of Agile Thinking in management of project portfolio and company development. At any point in time, companies have a crowd of development initiatives spread around the organisation and managed at different levels...... in the managerial hierarchy. They compete for resources and managerial attention, and they often take too long time - and some do not survive in the rapid changing context. Top man¬agers ask for speed, flexibility and effectiveness in the portfolio of development activities (projects). But which competencies...

  16. Project management in the library workplace

    CERN Document Server

    Daugherty, Alice

    2018-01-01

    This volume of Advances in Library Administration and Organization attempts to put project management into the toolboxes of library administrators through overviews of concepts, analyses of experiences, and forecasts for the use of project management within the profession.

  17. Project Management Support and Services for the Environmental Restoration and Waste Management. Final report

    International Nuclear Information System (INIS)

    1995-01-01

    The Los Alamos National Laboratory (LANL) Environmental Restoration Technical Support Office (ERTSO) contracted Project Time ampersand Cost, Inc. (PT ampersand C) on 16 November 1992 to provide support services to the US Department of Energy (DOE). ERTSO had traditionally supported the DOE Albuquerque office in the Environmental Restoration and Waste Management Programs and had also supported the Office of Waste Management (EM-30) at DOE Headquarters in Germantown, Maryland. PT ampersand C was requested to provide project management and support services for the DOE as well as liaison and coordination of responses and efforts between various agencies. The primary objective of this work was to continue LANL's technical support role to EM-30 and assist in the development of the COE Cost and Schedule Estimating (CASE) Guide for EM-30. PT ampersand C's objectives, as specified in Section B of the contract, were well met during the duration of the project through the review and comment of various draft documents, trips to DOE sites providing program management support and participating in the training for the EM-30 Cost and Schedule Estimating Guide, drafting memos and scheduling future projects, attending numerous meetings with LANL, DOE and other subcontractors, and providing written observations and recommendations.he results obtained were determined to be satisfactory by both the LANL ERTSO and DOE EM-30 organizations. The objective to further the support from LANL and their associated subcontractor (PT ampersand C) was met. The contract concluded with no outstanding issues

  18. How Agile Methods Conquers General Project Management - The Project Half Double Initiative

    DEFF Research Database (Denmark)

    Tordrup Heeager, Lise; Svejvig, Per; Schlichter, Bjarne Rerup

    2016-01-01

    Increased complexity in projects has forced new project management initiatives. In software development several agile methods have emerged and methods such as Scrum are today highly implemented in practice. General project management practice has been inspired by agile software development...

  19. Nuclear project management experience in Korea

    International Nuclear Information System (INIS)

    Jae-Pung Jeon

    1987-01-01

    Korea Electric Power Corporation (KEPCO) has been dereloping nuclear power steadily over last 30 years to support effective economic growth of the nation with cheap electric power. In the course of development, KEPCO has experienced various project management patterns diverging from turn-key contracts with foreign vendors to non-turnkey with local affiliates. To culative own project management capabilities, one has to pay continuous efforts for better management systems development and manpower training. KEPCO is ready to share its priceless experiences gained over last three decades of nuclear project operation with any developing nation. (Liu)

  20. THE MANAGEMENT OF SOCIAL RESPONSIBILITY PROJECTS: A HIGH-PRIORITY ETHICAL PROBLEM IN THE UNIVERSITY AGENDA

    Directory of Open Access Journals (Sweden)

    Jorge Palencia

    2007-11-01

    Full Text Available This work paper points out that the management of social responsibility is a high-priority project in the agenda of university organizations. Social Responsibility is reasoned as a macro university ethical project; about how the projects in the university scope have been handled and finally about how the Intellectus Model is a successful option. By means of a documentary research, it was conclude that the university organizations come dragging a culture lack from ethics, which has taken it to assume the Social Responsibility with an extencionist approach. It is recommended to assume the Social Responsibility Project as a coexistence culture and to manage it by means of the Projects Management.

  1. Risk management in product innovation projects

    NARCIS (Netherlands)

    Halman, J.I.M.; Keizer, J.A.

    1993-01-01

    In product innovation projects risk management has become increasingly important. Technological and commercial developments ask for effective and efficient product innovation. Systematic diagnosing and management of risks can help to make product innovation projects successful. In this paper a

  2. Technological economics: innovation, project management, and technology transfer

    Energy Technology Data Exchange (ETDEWEB)

    Bradbury, F R

    1981-06-01

    The relationship between economics and technology, as well as their interaction in production, productivity, project management, and in technology transfer processes are reviewed. Over the last two decades there has been an increasing interest by economists in the technologist's view of technical change and its mechanisms. The author looks at the zone between technology and economics, the technological economics, and discusses the theory of innovation recently sketched out by Nelson and Winter. The relevance to project management and technology transfer of contemporary writing by economists leads to the view that there are welcome signs of a convergence of the conceptual models now emerging and the practical problems of technology management and movement. Economists now seem more willing to come to terms with technology than technologists with economics. The economic significance of the multitudes of technically unglamorous activities in development work is seriously neglected as a result of over-emphasis on the spectacular technological break. If economic elegance were to be admitted to the criteria of success, one might get a significant improvement in the engineering of technological change. 29 references, 4 figure.

  3. SRP [Salt Repository Project] configuration management plan

    International Nuclear Information System (INIS)

    1987-01-01

    This configuration management plan describes the organization, policies, and procedures that will be used on the Salt Repository Project (SRP) to implement the configuration management disciplines and controls. Configuration management is a part of baseline management. Baseline management is defined in the SRP Baseline Procedures Notebook and also includes cost and schedule baselines. Configuration management is a discipline applying technical and administrative direction and surveillance to identify and document the functional and physical characteristics of an item, to control changes to those characteristics, to record and report change processing and implementation status, and to audit the results. Configuration management is designed as a project management tool to determine and control baselines, and ensure and document all components of a project interface both physically and functionally. The purpose is to ensure that the product acquired satisfies the project's technical and operational requirements, and that the technical requirements are clearly defined and controlled throughout the development and acquisition process. 5 figs

  4. Wisdom for Building the Project Manager/Project Sponsor Relationship: Partnership for Project Success

    National Research Council Canada - National Science Library

    Patton, Nanette; Shechet, Allan

    2007-01-01

    .... This article discusses conventional roles and responsibilities of the project sponsor and then discusses strategies a project manager can employ to define boundaries to reduce role confusion and promote partnership to facilitate project success.

  5. Sustainability in Project Management: Reality Bites

    NARCIS (Netherlands)

    Gilbert Gilbert Silvius; Ron Schipper; Snezana Nedeski

    2012-01-01

    The relationship between project management and sustainable development is rapidly gaining interest from both practitioners and academics. Studies on the integration of the concepts of sustainability into project management, approach this topic mostly from a conceptual, logical or moral point of

  6. Human resource management in the project-oriented organization: Employee well-being and ethical treatment

    OpenAIRE

    Turner, R.; Huemann, M.; Keegan, A.

    2008-01-01

    As part of a wider study into human resource management (HRM) practices in project-oriented organizations, we investigated the issue of employee well-being. Project-oriented organizations adopt temporary work processes to deliver products and services to clients. This creates a dynamic work environment, where additional pressures can be imposed on the employee from fluctuating work-loads, uncertain requirements, and multiple role demands. These pressures can create issues for employee well-be...

  7. COORDINATES OF A RISK MANAGEMENT PROJECT

    Directory of Open Access Journals (Sweden)

    ALEXANDRU OLTEANU

    2013-05-01

    Full Text Available High risk – high benefit: a well-known correlation both in the economic field and in the day-to-day life. Another correlation, on which this article is based: large project – numerous participants – increased risks and other malfunctions. The risk management concept is challenged by those projects and is forced to find the most adequate “customized” ways for each project at its turn. In this respect, the assessment of management has followed the trend of the last three decades, marked by moving of management profit analysis by risk intermediation, respectively the transition from managing profit to risk-return relationship management. Such trend assumes the obligation of participants to identify objectives and expected benefits of the project on the basis of the strategies laid-down, the elements of risk management policies, in conjunction with the indication of the most negative scenarios which they may provide. This activity must take into consideration the process of obtaining and combining human, financial, physical and information resources in order to accomplish the primary goal of the proposed and wanted project by a certain segment of population. Project participants are directed to evaluate their own activities in terms of revenues and risks from the business access, opportunity, operating mode, as well as the limitations and boundaries on certain sides of activity. The paper focuses on the analysis and evaluation of incomes and risks, on simulations to streamline the activities and the determination of the optimal model of project choice. Also, the paper treats the risks that can be taken over by the sponsors, especially those related to implied guaranties, even implied guaranties.

  8. Theoretical Approach Regarding the Bases of Success and Reasons that May Lead to Failure in Project Management

    OpenAIRE

    Larisa Loredana Dragolea; Denisa Cotîrlea Denisa

    2012-01-01

    The present paper work deals with theoretical concepts regarding the reasons that may lead to a project’s failure or success. The primary aim of the work paper is to help readers to get a view of conceptualizations of project management and its phases, while providing an opportunity to see the interferences of factors that may determine project’s success. This work paper also contains some aspects regarding key-factors and elements that may assure a good management of projects. The present su...

  9. Project management plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2010-12-01

    The Dallas Integrated Corridor Management System Demonstration Project is a multi-agency, de-centralized operation which will utilize a set of regional systems to integrate the operations of the corridor. The purpose of the Dallas ICM System is to im...

  10. Analysis of interactions among barriers in project risk management

    Science.gov (United States)

    Dandage, Rahul V.; Mantha, Shankar S.; Rane, Santosh B.; Bhoola, Vanita

    2018-03-01

    In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk management, the manifestation of barriers to project risk management is a less dwelt topic. The success of project management is oftentimes based on the understanding of barriers to effective risk management, application of appropriate risk management methodology, proactive leadership to avoid barriers, workers' attitude, adequate resources, organizational culture, and involvement of top management. This paper represents various risk categories and barriers to risk management in domestic and international projects through literature survey and feedback from project professionals. After analysing the various modelling methods used in project risk management literature, interpretive structural modelling (ISM) and MICMAC analysis have been used to analyse interactions among the barriers and prioritize them. The analysis indicates that lack of top management support, lack of formal training, and lack of addressing cultural differences are the high priority barriers, among many others.

  11. INFORMATION TECHNOLOGY IN INVESTMENT PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Vjacheslav A. Kozlov

    2014-01-01

    Full Text Available In the article it is proved that use of information technology today is not only something innovative distinctive feature and competitive advantage for organizations, but it is a necessary condition for effective business. The article discusses the main functionality of financial-analytical system Project Expert as an effective tool of investment project management and instrument of business planning. The main advantages which organizations get from Project Expert program use are in detail considered. Thus in the article Project Expert is considered as the effective tool of investment project management which allows to receive a number of advantages and to carry out the qualitative analysis of projects.

  12. The Use of Virtual Project Teams for Project Management in Jordanian Corporations

    Directory of Open Access Journals (Sweden)

    Belal Hashem Alnsour

    2014-09-01

    Full Text Available Jordanian companies need virtual project teams that can use advanced technology to solve problems and make specialist multi perspective decisions when working across different and distance location. The main mission of the team is to make decisions through interdependent specialists and perspectives. In terms of its use and application, the virtual project team is a difficult challenge for Jordan corporations. This study aims to explore such applications and to detect which factors face virtual project teams in the Jordanian situation. The author focused on how to explore and gain a deeper understanding from a virtual team’s perspective, and team members’ opinions of the factors in the organization that support or hinder the mission. More specifically, this research sought to discover precisely which factors in an organization support virtual project teams, and how they can develop a support system which enables their work in an Arab environment. The main objective was to identify the effects of all factors on the efficiency of virtual teams. The research used empirical case studies from three Jordanian corporations in the communication sector which operate in a high-tech environment, and used surveys to collect data. Structured interviews with both management and team members during the study discovered that the use of virtual teams within Jordanian companies is still limited, and detected that the main factors which hinder their development in many corporations is the level of trust in the ability of virtual teams, together with the high level of centralized decision making in Jordanian corporations. Additionally, communication and coordination affect the execution of work processes and methods for virtual teams, together with a general weakness which exists in terms of infrastructure, resources and technology within the corporation, which then impacts on the efficiency of virtual team work.

  13. Strategically oriented management and controlling of resource intensive projects

    International Nuclear Information System (INIS)

    Kemmeter, Sascha

    2015-01-01

    The book on strategically oriented management and controlling of resource intensive projects covers the following issues: frame of project management and project controlling, classification of the decommissioning of nuclear facilities as resource intensive projects, research design for case studies, results of the study of project management specific characteristics of decommissioning, reference model for the project management of nuclear facility decommissioning.

  14. Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-08-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year

  15. Reducing Stress within the Rehabilitative Work Setting - A Report on the ROSE Project

    Science.gov (United States)

    Wells, John S. G.; Denny, Margaret

    Reducing Occupational Stress in Employment (ROSE) is an EU funded project which aims to develop a combined person and work directed stress management programme in order to improve the long-term retention of staff in the vocational rehabilitation sector for mental health and intellectual disabilities.

  16. SIMULATION OF ORGANIZATIONAL ILLNESSES IN PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Денис Антонович ХАРИТОНОВ

    2015-05-01

    Full Text Available The article examined the fractal model of organizational diagnosis of pathologies in project management development. The proposed fractal model based on the competency approach to project management and allows evaluating the pathology of the project-oriented organizations.

  17. Restucturing the Project Work Format

    DEFF Research Database (Denmark)

    Dupont, Søren

    2015-01-01

    The chapter is based on an evaluation of a pedagogical experiment at Roskilde University, the Antology Experiment. The objective of the experiment was to develop and expand the framework for project work through the production of anthologies compiled collectively by a number of project groups....... The novel aspects of the Anthology Experiment were most notably its magnitude and complexity. In this experiment the groups were totalling some 50 students who were working together. The experiment used a well-known publishing format from research, namely the anthology form, which usually focuses...... on a specific research topic and includes contributions from various researchers. In the Anthology Experiment, the project groups could be viewed as ‘research units’ that produce the contributions to the anthology. The complexity of the experiment offered challenges, both for students and supervisors...

  18. How Configuration Management (CM) Can Help Project Teams To Innovate and Communicate

    Science.gov (United States)

    Cioletti, Louis

    2009-01-01

    Traditionally, CM is relegated to a support role in project management activities. CM s traditional functions of identification, change control, status accounting, and audits/verification are still necessary and play a vital role. However, this presentation proposes CM s role in a new and innovative manner that will significantly improve communication throughout the organization and, in turn, augment the project s success. CM s new role is elevated to the project management level, above the engineering or sub-project level in the Work Breakdown Structure (WBS), where it can more effectively accommodate changes, reduce corrective actions, and ensure that requirements are clear, concise, and valid, and that results conform to the requirements. By elevating CM s role in project management and orchestrating new measures, a new communication will emerge that will improve information integrity, structured baselines, interchangeability/traceability, metrics, conformance to standards, and standardize the best practices in the organization. Overall project performance (schedule, quality, and cost) can be no better than the ability to communicate requirements which, in turn, is no better than the CM process to communicate project decisions and the correct requirements.

  19. Enhanced project management tool

    Science.gov (United States)

    Hsu, Chen-Jung (Inventor); Patel, Hemil N. (Inventor); Maluf, David A. (Inventor); Moh Hashim, Jairon C. (Inventor); Tran, Khai Peter B. (Inventor)

    2012-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.

  20. Software Tools Streamline Project Management

    Science.gov (United States)

    2009-01-01

    Three innovative software inventions from Ames Research Center (NETMARK, Program Management Tool, and Query-Based Document Management) are finding their way into NASA missions as well as industry applications. The first, NETMARK, is a program that enables integrated searching of data stored in a variety of databases and documents, meaning that users no longer have to look in several places for related information. NETMARK allows users to search and query information across all of these sources in one step. This cross-cutting capability in information analysis has exponentially reduced the amount of time needed to mine data from days or weeks to mere seconds. NETMARK has been used widely throughout NASA, enabling this automatic integration of information across many documents and databases. NASA projects that use NETMARK include the internal reporting system and project performance dashboard, Erasmus, NASA s enterprise management tool, which enhances organizational collaboration and information sharing through document routing and review; the Integrated Financial Management Program; International Space Station Knowledge Management; Mishap and Anomaly Information Reporting System; and management of the Mars Exploration Rovers. Approximately $1 billion worth of NASA s projects are currently managed using Program Management Tool (PMT), which is based on NETMARK. PMT is a comprehensive, Web-enabled application tool used to assist program and project managers within NASA enterprises in monitoring, disseminating, and tracking the progress of program and project milestones and other relevant resources. The PMT consists of an integrated knowledge repository built upon advanced enterprise-wide database integration techniques and the latest Web-enabled technologies. The current system is in a pilot operational mode allowing users to automatically manage, track, define, update, and view customizable milestone objectives and goals. The third software invention, Query

  1. Risk Management of NASA Projects

    Science.gov (United States)

    Sarper, Hueseyin

    1997-01-01

    Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

  2. HERMES project management I

    CERN Multimedia

    CERN. Geneva

    2013-01-01

    A two-hours course on the HERMES Project Management Methodology to the attention of Project Leaders and Project Participants. The methodology is quickly presented; the focus is put on the roles and responsibilities and on the project initiation phase. The course is given in French with slides in English. On April 22nd 2013, a new version of the HERMES methodology was made public. For practical reasons, this course is still given based on the 2009 version of HERMES (a.k.a. HERMES 4).

  3. Group dynamics for the acquisition of competences in Project Management

    Science.gov (United States)

    Taguas, E. V.; Aguilar, M. C.; Castillo, C.; Polo, M. J.; Pérez, R.

    2012-04-01

    The Bologna Process promotes European citizens' employability from teaching fields in the University which implies the design of activities addressed to the development of skills for the labor market and engagement of employers. This work has been conceived for improving the formation of Engineering Project Management through group dynamics focused on: 1) the use of the creativity for solving problems; 2) promoting leadership capacities and social skills in multidisciplinary/multicultural work groups; 3) the ethical, social and environmental compromise; 4) the continuous learning. Different types of activities were designed: short activities of 15-30 minutes where fragments of books or songs are presented and discussed and long activities (2 h) where groups of students take different roles for solving common problems and situations within the Engineering Projects context. An electronic book with the content of the dynamics and the material for the students has been carried out. A sample of 20 students of Electronic Engineering degree which had participated at least in two dynamics, evaluated the utility for improving their formation in Engineering Project Management with a mark of 8.2 (scale 0-10, standard deviation equal to 0.9). On the other hand, the teachers observed how this type of work, promotes the interdisciplinary training and the acquisition of social skills, usually not-included in the objectives of the subjects.

  4. IT project management 30 steps to success

    CERN Document Server

    Doraiswamy, Premanand

    2011-01-01

    This pocket guide is designed to help IT project managers to succeed, and is based on the author's years of experience in IT project management. The guide's step-by-step approach will enable those new to IT project management, or intending to make a career in this field, to master the essential skills. For seasoned professionals, the pocket guide offers an invaluable concise reference guide.

  5. The use of intelligent systems for risk management in software projects

    Directory of Open Access Journals (Sweden)

    Oksana A. Gushchina

    2017-06-01

    Full Text Available Introduction: The article identifies the main risks of a software project, examines the use of different types of intelligent systems in the risk management process for software projects, discusses the basic methods used for process estimation and forecasting in the field of software engineering, identifies currently used empty expert systems, software systems for analysis and risk management of software projects. Materials and Methods: The author describes the peculiarities of risk management in the field of software engineering with involvement of intelligent systems. The intelligent techniques allow solving the control task with expert precision without the involvement of human experts. Results: The result of this work: – identification of the key risks of a software project (tax, legal, financial and commercial risks, IT risks, personnel risks, risks related to competitors, suppliers, marketing and demand and market; – investigation of the current, applied to risk management of software system projects, artificial intelligence, particularly expert systems and software tools for evaluation of the process results; – identification of the most popular empty expert systems (Clips, G2 and Leonardo and software products of the analysis of large databases (Orange, Weka, Rattle GUI, Apache Mahout, SCaViS, RapidMiner, Databionic ESOM Tools, ELKI, KNIME, Pandas and UIMA; – consideration of the cluster, correlation, regression, factor and dispersion analysis methods for the estimation and prediction of the processes of software engineering. Discussion and Conclusions: The results show the feasibility of the application of various intelligent systems in the risk management process. The analysis of methods of evaluating risks and the tendency of their application in the modern systems of intellectual analysis can serve as a start point for creating a unified system of risk management for software projects of medium and high complexity with a

  6. Does Lean & Agile Project Management Help Coping with Project Complexity?

    NARCIS (Netherlands)

    Jalali Sohi, A.; Hertogh, M.J.C.M.; Bosch-Rekveldt, M.G.C.; Blom, R.; Serpell, A.; Ferrada, X.

    2016-01-01

    Still, projects in the construction sector are delivered with time delays and cost overruns. One of the reasons for poor performance was assigned to project complexity. A combination of lean construction and agile project management are hypothesized as a possible solution to cope with project

  7. Spent Nuclear Fuel Project dose management plan

    International Nuclear Information System (INIS)

    Bergsman, K.H.

    1996-03-01

    This dose management plan facilitates meeting the dose management and ALARA requirements applicable to the design activities of the Spent Nuclear Fuel Project, and establishes consistency of information used by multiple subprojects in ALARA evaluations. The method for meeting the ALARA requirements applicable to facility designs involves two components. The first is each Spent Nuclear Fuel Project subproject incorporating ALARA principles, ALARA design optimizations, and ALARA design reviews throughout the design of facilities and equipment. The second component is the Spent Nuclear Fuel Project management providing overall dose management guidance to the subprojects and oversight of the subproject dose management efforts

  8. A fuzzy hybrid approach for project manager selection

    Directory of Open Access Journals (Sweden)

    Ahmad Jafarnejad Chaghooshi

    2016-09-01

    Full Text Available Suitable project manager has a significant impact on successful accomplishment of the project. Managers should possess such skills in order to effectively cope with the competition. In this respect, selecting managers based on their skills can lead to a competitive advantage towards the achievement of organizational goals. selection of the suitable project manager can be viewed as a multi-criteria decision making (MCDM problem and an extensive evaluation of criteria, such as Technical skills, experience skills, Personal qualities and the related criteria must be considered in the selection process of project manager. The fuzzy set theory and MCDM methods appears as an essential tools to provide a decision framework that incorporates imprecise judgments and multi criteria nature of project manager selection process inherent in this process. This paper proposes the joint use of the Fuzzy DEMATEL (FDEMATEL and Fuzzy VIKOR methods for the decision-making process of selecting the most suitable managers for projects. First, with the opinions of the senior managers based on project management competency model (ICB-IPMA, all the criteria required for the selection are gathered. Then the FDEMATEL method is used to prioritize the importance of various criteria and FVIKOR used to rank the alternatives in a preferred order to select the best project managers from a number of alternatives. Next, a real case study used to illustrate the process of the proposed method. Finally, some conclusions are discussed at the end of this study.

  9. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  10. Open Source and Proprietary Project Management Tools for SMEs.

    OpenAIRE

    Veronika Abramova; Francisco Pires; Jorge Bernardino

    2017-01-01

    The dimensional growth and increasing difficulty in project management promoted the development of different tools that serve to facilitate project management and track project schedule, resources and overall progress. These tools offer a variety of features, from task and time management, up to integrated CRM (Customer Relationship Management) and ERP (Enterprise Resource Planning) modules. Currently, a large number of project management software is available, to assist project team during t...

  11. The influences of attributes, skills and knowledge of managers on refurbishment project performance

    Science.gov (United States)

    Ishak, Nurfadzillah

    2018-02-01

    Recently, the momentum on the growth of national building industry shows the increasing of the demand in refurbishment works becomes a trend spreading over the Malaysia. However, the potential of these activities normally related with the complexity in technical aspect compared to new build schemes. It will be reflecting on the unsatisfactory project performance. A competent manager is required to have the appropriate attributes, skills and knowledge in able to perform all the duties associated with managing the refurbishment building projects. Therefore, this paper is to identify the most appropriate attributes, skills and knowledge that required for managers to indicate the relationship between the influences on the refurbishment projects performance. This finding is indicate the importance of development the personal attributes, skills, and knowledge of managers and adds as benefit of raising the profile and image of managers in refurbishment building industry through a dissemination of the findings.

  12. The agile edge managing projects effectively using agile scrum

    CERN Document Server

    Vanderjack, Brian

    2015-01-01

    This concise book is an effective source for understanding Agile Scrum development; why we use it and how it works. It will explain how work gets done in manageable iterations (sprints) and the team meetings that keep work on track (ceremonies). Also, since risk is a constant threat to any team-based project, managing risk in an Agile Scrum environment is specii cally discussed. This book is for: New Agile Scrum team members. Team leaders - this book describes the foundation of Agile Scrum, which can save time getting team members on the same page. Trainer/Educator of Agile Scrum - this book clearly defines Agile Scrum in a structured way so that students can learn how to effectively serve on an Agile team to improve their marketability. If you need to know Agile Scrum, this book will show you how to own it.

  13. The lazy project manager how to be twice as productive and still leave the office early

    CERN Document Server

    Taylor, Peter

    2009-01-01

    Peter Taylor reveals how adopting a more focused approach to life, projects and work can make you twice as productive. The lazy project manager illustrates how anyone can apply the simple techniques of lazy project management in their own activities in order to work more effectively and consequently improve work-life balance. This 'productive laziness' approach builds on the Pareto principle that states that for many phenomena, 80 per cent of consequences stem from 20 per cent of the causes. To put it simply, only 20 per cent of the things people do during their working days really matter. Inside this insightful and informative book you'll discover: * The intelligence of laziness - why smart, lazy people have the edge over others; * Why the Jungle Book's 'Bare Necessities' should be the productive lazy theme tune; * How to get the maximum output for a minimised input; * Quick tips to productive lazy heaven. Everyone wants to achieve more without chaining themselves to their desk. By concentrating your project...

  14. Knowledge Model: Project Knowledge Management

    DEFF Research Database (Denmark)

    Durao, Frederico; Dolog, Peter; Grolin, Daniel

    2009-01-01

    The Knowledge model for project management serves several goals:Introducing relevant concepts of project management area for software development (Section 1). Reviewing and understanding the real case requirements from the industrial perspective. (Section 2). Giving some preliminary suggestions...... for usage in KIWI system (Sections 3). This document is intended for technological partners to understand how for example the software development concepts can be applied to a semantic wiki framework....

  15. Major Events Coordinated Security Solutions: The Application of the Project Management Body of Knowledge for Managing a Science and Technology Project

    Science.gov (United States)

    2011-02-01

    represents the sum of knowledge related to project management and includes best practises and techniques generally accepted by the project...project has demonstrated that the principles of project management can be applied even to those activities that naturally resist the structure and...team and to engender trust in the output. DRDC believes strongly in the application of sound project management principles and uses an abbreviated

  16. Uranium Mill Tailings Remedial Action Project surface project management plan

    International Nuclear Information System (INIS)

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials

  17. Making Things Happen Mastering Project Management

    CERN Document Server

    Berkun, Scott

    2008-01-01

    In the updated edition of this critically acclaimed and bestselling book, Microsoft insider Scott Berkun offers a collection of essays on field-tested philosophies and strategies for defining, leading, and managing projects. Based on his nine years of experience as a program manager for Microsoft's biggest projects, Berkun explains to technical and non-technical readers alike what it takes to get through a large software or web development project.

  18. Global Project Management: Graduate Course

    National Research Council Canada - National Science Library

    Beranek, Thomas R

    2006-01-01

    ..., A. James Clark School of Engineering - Project Management Program. The course slides and suggested readings provide a general exploration of the nuances of doing projects globally as compared to domestically...

  19. UMTRA [Uranium Mill Tailings Remedial Action] Project site management manual

    International Nuclear Information System (INIS)

    1990-10-01

    The purpose of this manual is to summarize the organizational interfaces and the technical approach used to manage the planning, design development, National Environmental Policy Act (NEPA) compliance, engineering, and remedial action required to stabilize and control the designated Uranium Mill Tailings Remedial Action (UMTRA) Project sites. This manual describes the Project's objective, participants' roles and responsibilities, technical approach for accomplishing the objective, and planning and managerial controls to be used in performing the site work. The narrative follows the flow of activities depicted in Figure 1.1, which provides the typical sequence of key Project activities. A list of acronyms used is presented at the end of the manual. The comparable manual for UMTRA Project vicinity properties is the ''Vicinity Properties Management and Implementation Manual'' (VPMIM) (UMTRA-DOE/AL-050601). Together, the two manuals cover the remedial action activities associated with UMTRA Project sites. The UMTRA Project's objective is to stabilize and control the uranium mill tailings, vicinity property materials, and other residual radioactive materials at the designated sites (Figure 1.2) in a safe and environmentally sound manner in order to minimize radiation health hazards to the public. 26 figs., 6 tabs

  20. Applying a life cycle approach to project management methods

    OpenAIRE

    Biggins, David; Trollsund, F.; Høiby, A.L.

    2016-01-01

    Project management is increasingly important to organisations because projects are the method\\ud by which organisations respond to their environment. A key element within project management\\ud is the standards and methods that are used to control and conduct projects, collectively known as\\ud project management methods (PMMs) and exemplified by PRINCE2, the Project Management\\ud Institute’s and the Association for Project Management’s Bodies of Knowledge (PMBOK and\\ud APMBOK. The purpose of t...