  1. NASA Space Flight Program and Project Management Handbook

    Science.gov (United States)

    Blythe, Michael P.; Saunders, Mark P.; Pye, David B.; Voss, Linda D.; Moreland, Robert J.; Symons, Kathleen E.; Bromley, Linda K.

    2014-01-01

    This handbook is a companion to NPR 7120.5E, NASA Space Flight Program and Project Management Requirements and supports the implementation of the requirements by which NASA formulates and implements space flight programs and projects. Its focus is on what the program or project manager needs to know to accomplish the mission, but it also contains guidance that enhances the understanding of the high-level procedural requirements. (See Appendix C for NPR 7120.5E requirements with rationale.) As such, it starts with the same basic concepts but provides context, rationale, guidance, and a greater depth of detail for the fundamental principles of program and project management. This handbook also explores some of the nuances and implications of applying the procedural requirements, for example, how the Agency Baseline Commitment agreement evolves over time as a program or project moves through its life cycle.

  2. Successful healthcare programs and projects: organization portfolio management essentials.

    Science.gov (United States)

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.

  3. Status of Pantex Plant Waste Management Project/program control system

    International Nuclear Information System (INIS)

    Price, Wesley J.; Matthews, William L.

    1992-01-01

    During a December 1990 Waste Management Program Review held in Albuquerque, New Mexico, the Waste Management and Operational Surety Division (WMOSD) introduced the project control system to be used for the Waste Management (WM) Operations Program. The system was entitled 'TRAC-WM' (Tracking and Control for Waste Management). The stated objective for this system was to establish a frame work for planning, managing, and controlling work within the WM program. As a result Mason and Hanger (the operating contractor at the Pantex Plant) initiated the development of a computerized waste management project tracking system. (author)

  4. Integrated Risk Management Within NASA Programs/Projects

    Science.gov (United States)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  5. Academy of Program/Project & Engineering Leadership: NASA's Path to Project Management Excellence

    Data.gov (United States)

    National Aeronautics and Space Administration — NASA's Path to Project Management Excellence eBook. Leadership plays a critical role in the success of today’s programs and projects. In an increasingly global and...

  6. Spent Nuclear Fuel Project document control and Records Management Program Description

    International Nuclear Information System (INIS)

    MARTIN, B.M.

    2000-01-01

    The Spent Nuclear Fuel (SNF) Project document control and records management program, as defined within this document, is based on a broad spectrum of regulatory requirements, Department of Energy (DOE) and Project Hanford and SNF Project-specific direction and guidance. The SNF Project Execution Plan, HNF-3552, requires the control of documents and management of records under the auspices of configuration control, conduct of operations, training, quality assurance, work control, records management, data management, engineering and design control, operational readiness review, and project management and turnover. Implementation of the controls, systems, and processes necessary to ensure compliance with applicable requirements is facilitated through plans, directives, and procedures within the Project Hanford Management System (PHMS) and the SNF Project internal technical and administrative procedures systems. The documents cited within this document are those which directly establish or define the SNF Project document control and records management program. There are many peripheral documents that establish requirements and provide direction pertinent to managing specific types of documents that, for the sake of brevity and clarity, are not cited within this document

  7. What is the role of a project or program manager in implementing and maintaining a quality assurance program

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    The task of managing a government-funded program has changed significantly from the days when a program manager managed the funds and depended on reports from a contractor to measure the program's progress. Today's manager of waste management program must be personally involved in every aspect of the program. The successful manager of a waste management program will lead the development of management controls to ensure successful accomplishment of project objectives. This paper describes the responsibilities of the project manager, the quality assurance staff and how they interface to develop and implement a quality assurance program for a waste management program

  8. STRATEGIC PROJECT MANAGEMENT PRINCIPLES, PROGRAMS AND PORTFOLIOS OF THE MEDICAL INSTITUTION

    Directory of Open Access Journals (Sweden)

    Елена Борисовна ДАНЧЕНКО

    2017-03-01

    Full Text Available The article gives a brief overview of the latest research in the direction of the use of the project-based approach to the management of medical institutions. It is shown that medicine today is a project-oriented area, and modern scientific studies suggest the use of not only the project management approach and portfolio management. The various scientific sources proposed the classification of projects of medical institutions, mechanisms of formation of projects portfolios of such institutions. The concept of integrated management of medical institutions, which includes strategic, project, portfolio, program management approach (S3P-concept, is offered. According to this concept, the process of S3P-management of the medical institution will include four stages, which are closely interrelated. For the first time, the pair principles of S3P-management are formulated. The proposed concept and principles of S3P-management of medical institution require further development and creating of models, methods and integrated management tools, as well as the development of a system of indicators verify compliance with the organization's strategy of its projects, projects portfolios and programs. This concept and the proposed integrated management principles are universal and can be applied to any project-oriented area.

  9. IMPLEMENTATION OF WORK LIFE QUALITY PROGRAMS WITH THE PROJECT MANAGEMENT MODEL

    Directory of Open Access Journals (Sweden)

    Maria Lúcia Granja Coutinho

    2010-06-01

    Full Text Available The research studies the implementation of Quality of Working Life (QWL programs using project management techniques. Quality of Work Life projects have undergone a constant increase in scope to the point where they currently involve such diverse themes as change in dietary habits, exercise, stress management, socio environmental responsibility, and adult education. The major focus of this research is to analyze the processes and knowledge areas of project management being used to deal with this increased scope. The managerial processes identified were divided into categories of preparation, structuring, execution, and conclusion. The knowledge areas studied were: communication, risks, human resources, and acquisitions. The firms studied included mid to large sized firms located in the north, southeast and south of Brazil. We interviewed managers, directors, CEOs, plant managers, and line managers as part of this effort. The results suggest that the project management practices used were ad hoc and based on day to day needs. They also suggest that sound project management practices are applicable to QWL programs in the firms we studied.

  10. Issues in NASA Program and Project Management. Special Report: 1997 Conference. Project Management Now and in the New Millennium

    Science.gov (United States)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics Considered Include: NASA's Shared Experiences Program; Core Issues for the Future of the Agency; National Space Policy Strategic Management; ISO 9000 and NASA; New Acquisition Initiatives; Full Cost Initiative; PM Career Development; PM Project Database; NASA Fast Track Studies; Fast Track Projects; Earned Value Concept; Value-Added Metrics; Saturn Corporation Lessons Learned; Project Manager Credibility.

  11. Designing an Academic Project Management Program: A Collaboration between a University and a PMI Chapter

    Science.gov (United States)

    Poston, Robin S.; Richardson, Sandra M.

    2011-01-01

    The demand for project management skills in industry is increasing resulting in a higher demand for project management educational programs. Universities are addressing industry demand by developing project management courses, degree offerings and certificate programs that focus on both technical and general project management skills. While…

  12. Research-Informed Curriculum Design for a Master's-Level Program in Project Management

    Science.gov (United States)

    Bentley, Yongmei; Richardson, Diane; Duan, Yanqing; Philpott, Elly; Ong, Vincent; Owen, David

    2013-01-01

    This article reports on the application of Research-Informed Curriculum Design (RICD) for the development and implementation of an MSc Program in Project Management. The research focused on contemporary issues in project management and provided an analysis of project management approaches, tools, and techniques currently used in organizations.…

  13. Assurance management program for the 30 Nova laser fusion project

    International Nuclear Information System (INIS)

    Levy, A.J.

    1983-01-01

    The Nova assurance management program was developed using the quality assurance (QA) approach first implemented at LLNL in early 1978. The LLNL QA program is described as an introduction to the Nova assurance management program. The Nova system is described pictorially through the Nova configuration, subsystems and major components, interjecting the QA techniques which are being pragmatically used to assure the successful completion of the project

  14. The assurance management program for the Nova laser fusion project

    International Nuclear Information System (INIS)

    Levy, A.J.

    1983-01-01

    In a well managed project, Quality Assurance is an integral part of the management activities performed on a daily basis. Management assures successful performance within budget and on schedule by using all the good business, scientific, engineering, quality assurance, and safety practices available. Quality assurance and safety practices employed on Nova are put in perspective by integrating them into the overall function of good project management. The Inertial Confinement Fusion (ICF) approach is explained in general terms. The laser ICF and magnetic fusion facilities are significantly different in that the laser system is used solely as a highly reliable energy source for performing plasma physics experiments related to fusion target development; by contrast, magnetic fusion facilities are themselves the experiments. The Nova project consists of a 10-beam, 74 cm aperture neodymium-glass laser experimental facility which is being constructed by the Lawrence Livermore National Laboratory (LLNL) for the U.S. Department of Energy. Nova has a total estimated cost of $176M and will become operational in the Fall of 1984. The Nova laser will be used as the high energy driver for studying the regime of ignition for ICF. The Nova assurance management program was developed using the quality assurance (QA) approach first implemented at LLNL in early 1978. The LLNL QA program is described as an introduction to the Nova assurance management program. The Nova system is described pictorially through the Nova configuration, subsystems and major components, interjecting the QA techniques which are being pragmatically used to assure the successful completion of the project

  15. ePORT, NASA's Computer Database Program for System Safety Risk Management Oversight (Electronic Project Online Risk Tool)

    Science.gov (United States)

    Johnson, Paul W.

    2008-01-01

    ePORT (electronic Project Online Risk Tool) provides a systematic approach to using an electronic database program to manage a program/project risk management processes. This presentation will briefly cover the standard risk management procedures, then thoroughly cover NASA's Risk Management tool called ePORT. This electronic Project Online Risk Tool (ePORT) is a web-based risk management program that provides a common framework to capture and manage risks, independent of a programs/projects size and budget. It is used to thoroughly cover the risk management paradigm providing standardized evaluation criterion for common management reporting, ePORT improves Product Line, Center and Corporate Management insight, simplifies program/project manager reporting, and maintains an archive of data for historical reference.

  16. Quality Assurance Program Plan (QAPP) Waste Management Project

    Energy Technology Data Exchange (ETDEWEB)

    VOLKMAN, D.D.

    1999-10-27

    This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

  17. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  18. Transportation risk management : international practices for program development and project delivery.

    Science.gov (United States)

    2012-08-01

    Managing transportation networks, including agency : management, program development, and project : delivery, is extremely complex and fraught with : uncertainty. Administrators, planners, and engineers : coordinate a multitude of organizational and ...

  19. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Science.gov (United States)

    2010-10-01

    ... designation of a Program/Project Manager as the Contracting Officer's Technical Representative. 301.607-78... Contracting Officer designation of a Program/Project Manager as the Contracting Officer's Technical... acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  20. Prioritization of proposed waste management construction projects for the Waste Management program within the Department of Energy

    International Nuclear Information System (INIS)

    Johnson, J.V.

    1995-01-01

    A prioritization process is used to evaluate and rank proposed construction projects within the Department of Energy's Waste Management program. The process is used to determine which projects should proceed with conceptual design activities. The proposed construction projects are evaluated against a set of criteria which reflect Waste Management priorities. A management review team ranks and scores the projects thereby generating a prioritized list of projects. Despite decreasing budgets and changing political climates, the process has been a successful decision-aiding tool for selecting construction projects to carry out the Waste Management mission within the Department of Energy

  1. Public participation in UMTRA Project Program Management

    International Nuclear Information System (INIS)

    Majors, M.J.; Ulland, L.M.

    1993-01-01

    The U.S. Department of Energy (DOE) is cleaning up radioactive soil and ore residue from 24 inactive uranium processing sites under the Uranium Mill Tailings Remedial Action (UMTRA) Project. In early 1993, the DOE adopted new guidelines strongly encouraging public participation. This guidance commits to providing the public with opportunities to participate in the decision-making process for program planning, design, and implementation. Rooted in the conviction that an effective public participation program will enable citizens to take part in policy decisions, the full adoption of the guidance by the UMTRA project can also help DOE make better decisions, provide a means to build consensus, and assist in building credibility. This transition to open communication parallels the climate of corporate America in which increases in productivity are often the result of workers and management teaming together to solve problems. While these guidelines have been embraced by public affairs staff from headquarters to the field offices, barriers still exist that inhibit substantive public involvement. The challenge for the UMTRA project is to overcome these barriers to ensure that public participation is an integral part of the way business is conducted. This paper discusses lessons learned by the UMTRA project in its efforts to address barriers to public participation and the project's plans for full compliance with the DOE guidelines

  2. Project Risk Management

    Science.gov (United States)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  3. NHDOT : process for municipally managed state aid highway program projects

    Science.gov (United States)

    2006-05-23

    The design and construction of Municipally Managed State Aid Highway Program projects must comply with the requirements in this guideline in order to receive State Aid under the applicable provisions of RSA 235. Under this process, State Aid Construc...

  4. MEET : project action plan for AUMA energy management program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-11-22

    The Municipal Energy Efficiency Trust (MEET) action plan offers a framework to help municipalities in Alberta demonstrate leadership in reducing energy consumption. It sets out targets for energy reductions and the associated capital investment. As more information is compiled from energy audits, the targets will be refined. AUMA and Enmax Energy Corp have partnered to provide energy audits designed to allow all municipalities to undertake energy savings projects. The program is divided into 8 basic categories for energy savings projects including: water and sewage collection, treatment and distribution; recreation centres such as pools and skating rinks; streetlights; office buildings; garages, shops and parking lots; other and innovative projects; municipal audit evaluation support; and, direct grants applied to each project. The estimates for energy savings within each category are provided. The maximum allowable payback period for the project is assumed to be 15 years. Total municipal energy use in Alberta is estimated at 1,100,000 MWh per year. A province wide program will enable AUMA to provide centralized services such as project management and procurement services to address municipal resource constraints and provide some economies of scale for smaller municipalities. AUMA will act as the fund administrator and will set criteria for acceptable projects. The action plan focuses on the energy audit program, municipal facility data collection, municipal staff education, and the establishment of a funding pool. The target for 2002/2003 will be to identify projects with energy savings of at least 15,000 MWh for water treatment and distribution recreation centres for a total capital cost of $13,500,000. 1 tab., 3 figs.

  5. Data Management Challenges in a National Scientific Program of 55 Diverse Research Projects

    Science.gov (United States)

    De Bruin, T.

    2016-12-01

    In 2007-2015, the Dutch funding agency NWO funded the National Ocean and Coastal Research Program (in Dutch: ZKO). This program focused on `the scientific analysis of five societal challenges related to a sustainable use of the sea and coastal zones'. These five challenges were safety, economic yield, nature, spatial planning & development and water quality. The ZKO program was `set up to strengthen the cohesion and collaboration within Dutch marine research'. From the start of the program, data management was addressed, to allow data to be shared amongst the, diverse, research projects. The ZKO program was divided in 4 different themes (or regions). The `Carrying Capacity' theme was subdivided into 3 `research lines': Carrying capacity (Wadden Sea) - Policy-relevant Research - Monitoring - Hypothesis-driven Research Oceans North Sea Transnational Wadden Sea Research 56 Projects were funded, ranging from studies on the governance of the Wadden Sea to expeditions studying trace elements in the Atlantic Ocean. One of the first projects to be funded was the data management project. Its objectives were to allow data exchange between projects, to archive all relevant data from all ZKO projects and to make the data and publications publicly available, following the ZKO Data Policy. This project was carried out by the NIOZ Data Management Group. It turned out that the research projects had hardly any interest in sharing data between projects and had good (?) arguments not to share data at all until the end of the projects. A data portal was built, to host and make available all ZKO data and publications. When it came to submitting the data to this portal, most projects obliged willingly, though found it occasionally difficult to find time to do so. However, some projects refused to submit data to an open data portal, despite the rules set up by the funding agency and agreed by all. The take-home message of this presentation is that data sharing is a cultural and

  6. Program Management Tool

    Science.gov (United States)

    Gawadiak, Yuri; Wong, Alan; Maluf, David; Bell, David; Gurram, Mohana; Tran, Khai Peter; Hsu, Jennifer; Yagi, Kenji; Patel, Hemil

    2007-01-01

    The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity

  7. Academy of Program/Project & Engineering Leadership Orbital Debris Management and Risk Mitigation

    Data.gov (United States)

    National Aeronautics and Space Administration — The NASA Academy of Program/Project & Engineering Leadership (APPEL) is excited to announce the public release of Orbital Debris Management and Risk Mitigation,...

  8. A project management system for the X-29A flight test program

    Science.gov (United States)

    Stewart, J. F.; Bauer, C. A.

    1983-01-01

    The project-management system developed for NASA's participation in the X-29A aircraft development program is characterized from a theoretical perspective, as an example of a system appropriate to advanced, highly integrated technology projects. System-control theory is applied to the analysis of classical project-management techniques and structures, which are found to be of closed-loop multivariable type; and the effects of increasing project complexity and integration are evaluated. The importance of information flow, sampling frequency, information holding, and delays is stressed. The X-29A system is developed in four stages: establishment of overall objectives and requirements, determination of information processes (block diagrams) definition of personnel functional roles and relationships, and development of a detailed work-breakdown structure. The resulting system is shown to require a greater information flow to management than conventional methods. Sample block diagrams are provided.

  9. 78 FR 8544 - Training Program for Regulatory Project Managers; Information Available to Industry

    Science.gov (United States)

    2013-02-06

    ...] Training Program for Regulatory Project Managers; Information Available to Industry AGENCY: Food and Drug... Brum, Center for Drug Evaluation and Research, Food and Drug Administration, 10903 New Hampshire Ave... to industry's drug development processes and (2) a venue for sharing information about project...

  10. Role of quality assurance vs project manager's responsibility for waste projects

    International Nuclear Information System (INIS)

    Solecki, J.

    1989-01-01

    This paper takes a project manager's perspective and discusses the role of the quality assurance organization in the development, implementation and interface related to the QA program for waste projects. The author describes the role which the QA program plays in allowing project management to assure that the project manager knows what is placed in the repository and the characteristics of the surrounding environment meet closure requirements

  11. Academic Librarians at Institutions with LIS Programs Assert that Project Management Training is Valuable

    Directory of Open Access Journals (Sweden)

    Elaine Sullo

    2017-09-01

    Full Text Available A Review of: Serrano, S. C. & Avilés, R. A. (2016. Academic librarians and project management: An international study. portal: Libraries and the Academy, 16(3, 465-475. http://dx.doi.org/10.1353/pla.2016.0038 Abstract Objective – To investigate academic librarians’ project management education and training, project management skills and experiences, and perceptions of project management courses within the library and information science (LIS curriculum. Design – Online questionnaire. Setting – 70 universities worldwide with LIS programs and at least one project management course. Subjects – 4,979 academic librarians were invited to complete the online questionnaire; 649 librarians participated. Methods – From the identified institutions, the authors invited academic librarians to participate in a 17-question survey via e-mail. The survey was available in both English and Spanish and was validated via a pilot trial. A total of 649 individuals participated, for a response rate of 13%. The survey included questions related to geographic region and institution affiliation, university education and librarian training associated with project management, project participation and use of project management software or methods, and project management courses in LIS curriculums, and a final open-ended comment section. Main Results – Of the 649 librarians who participated in the survey, 372 were from North and South America (58%. The next highest number of responses came from Europe (38%, followed by low response rates from Africa, Asia, and Oceania. Respondents reported working in a variety of library departments and identified themselves as being one of a director or manager, assistant librarian, or library page. Of the 436 respondents who reported having a university degree, 215 attended an LIS Master’s level program, and 12 studied at the doctoral level. The majority of respondents indicated they have had training in project management

  12. 7 CFR 3565.351 - Project management.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  13. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  14. Risk Management System and Project Staff Education Program for Overseas Construction Project Using the Expert System

    OpenAIRE

    Hirota, Yoichi

    2007-01-01

    The turnover of the Japanese contractors and the consulting firms has kept the same level since 1983, in spite of the fact that the size of domestic market is shrinking. This is why they do not have a proper management system, especially risk management system for the overseas construction projects. This study aims at building risk management system and developing education program that can be applied to reinforcing the ability, based on the author’s experience. Risk is defined as “uncertain ...

  15. Law project of program relative to the management of radioactive materials and wastes

    International Nuclear Information System (INIS)

    Villepin, D. de; Breton, T.

    2006-03-01

    The law of the 30 December 1991 defined three axis of researches and fixed a the legal aspects of the researches programs management. Based on these researches results a law project has been defined. The first part of the document presents the objectives of the law project and discusses the different articles. The second part is devoted to the text of the law project. (A.L.B.)

  16. PROJECT MANAGEMENT CONSIDERED IN A 2014 PERSPECTIVE

    Directory of Open Access Journals (Sweden)

    GRAPĂ ADELINA-ROXANA

    2014-05-01

    Full Text Available Project Management has come of age, yet multiple surveys and reports confirm the fact that the majority of projects are challenged. Given the more demanding and strict financial constraints associated with the current fiscal climate, project management is regarded as a tool that can deliver more with less. The literature on Project Management shows that, in spite of advancement in Project Management processes, tools and systems, project success has not significantly improved. This problem raises questions about the value and effectiveness of Project Management and Project Management systems. Programs and projects are considered as strategic assets for the majority of businesses, therefore, the trend of these organizations is to embrace a management by projects culture. The main objective of Project Management nowadays is to ensure programs and projects aligned to a certain strategy and also to provide for every member of an organization the ability to take proactive actions creating additional benefits.

  17. Adapting Project Management Practices to Research-Based Projects

    Science.gov (United States)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  18. An Analysis Of The Benefits And Application Of Earned Value Management (EVM) Project Management Techniques For Dod Programs That Do Not Meet Dod Policy Thresholds

    Science.gov (United States)

    2017-12-01

    VALUE MANAGEMENT (EVM) PROJECT MANAGEMENT TECHNIQUES FOR DOD PROGRAMS THAT DO NOT MEET DOD POLICY THRESHOLDS December 2017 By: Randy Schneider...Joint applied project 4. TITLE AND SUBTITLE AN ANALYSIS OF THE BENEFITS AND APPLICATION OF EARNED VALUE MANAGEMENT (EVM) PROJECT MANAGEMENT ...performance reporting. The immediate objective of this research project was to examine the question: Can the application of EVM-Lite project management

  19. Environmental Management Science Program Workshop

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-07-01

    This program summary book is a compendium of project summaries submitted by principal investigators in the Environmental Management Science Program and Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program). These summaries provide information about the most recent project activities and accomplishments. All projects will be represented at the workshop poster sessions, so you will have an opportunity to meet with the researchers. The projects will be presented in the same order at the poster session as they are presented in this summary book. Detailed questions about an individual project may be directed to the investigators involved.

  20. Construction program management

    CERN Document Server

    Delaney, Joseph

    2013-01-01

    Although construction is one of the largest industries in the United States, it lags behind other industries in its implementation of modern management techniques such as those contained in the Standard for Program Management (the Standard) by the Project Management Institute (PMI(R)). Construction Program Management details the successful use of the PMI(R) approach for the construction of capital programs. It demonstrates, through case studies, how implementation of PMI's set of tools and techniques can improve the chances of program success. Exploring tactical and strategic management method

  1. Public participation in UMTRA Project program management

    International Nuclear Information System (INIS)

    Majors, M.J.; Ulland, L.M.

    1993-01-01

    Innovative techniques for overcoming barriers to public participation on the US Department of Energy's Uranium Mill Tailings Remedial Action (UMTRA) Project have led to improved communications with stakeholders at project sites and improved communications within the project. On the UMTRA Project, it's been shown that an effective public participation program is an essential element to successful project implementation

  2. Waste Management Process Improvement Project

    International Nuclear Information System (INIS)

    Atwood, J.; Borden, G.; Rangel, G. R.

    2002-01-01

    The Bechtel Hanford-led Environmental Restoration Contractor team's Waste Management Process Improvement Project is working diligently with the U.S. Department of Energy's (DOE) Richland Operations Office to improve the waste management process to meet DOE's need for an efficient, cost-effective program for the management of dangerous, low-level and mixed-low-level waste. Additionally the program must meet all applicable regulatory requirements. The need for improvement was highlighted when a change in the Groundwater/Vadose Zone Integration Project's waste management practices resulted in a larger amount of waste being generated than the waste management organization had been set up to handle

  3. PROJECT APPROACH TO ENERGY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Інга Борисівна СЕМКО

    2016-02-01

    Full Text Available Project management is widely used around the world as a tool to improve business performance. Correct implementation of the program of implementation of energy efficiency is accompanied by the adoption of an appropriate legislative framework, support programs, the approval of market-based instruments. Currently, it is paying enough attention to the effective application of market-based instruments, although most of the activities in the field of energy efficiency from the economic side are quite profitable. The authors suggested the use of the methodology of project management to the management of energy-saving measures, new approaches to the place and role of project management in the hierarchy of guidance. As a result, this innovation can improve the competitiveness of enterprises. The conclusions that the energy-saving project management allows you to get the best results for their implementation by reducing the time, resources, risk reduction.

  4. Industrial Program of Waste Management - Cigeo Project - 13033

    Energy Technology Data Exchange (ETDEWEB)

    Butez, Marc [Agence nationale pour la gestion des dechets radioactifs - Andra, 1-7, rue Jean Monnet 92298 Chatenay-Malabry (France); Bartagnon, Olivier; Gagner, Laurent [AREVA NC Tour AREVA 1 place de la Coupole 92084 Paris La Defense (France); Advocat, Thierry; Sacristan, Pablo [Commissariat a l' energie atomique et aux energies alternatives - CEA, CEA-SACLAY 91191 Gif sur Yvette Cedex (France); Beguin, Stephane [Electricite de France - EDF, Division Combustible Nucleaire, 1, Place Pleyel Site Cap Ampere93282 Saint Denis (France)

    2013-07-01

    The French Planning Act of 28 June 2006 prescribed that a reversible repository in a deep geological formation be chosen as the reference solution for the long-term management of high-level and intermediate-level long-lived radioactive waste. It also entrusted the responsibility of further studies and design of the repository (named Cigeo) upon the French Radioactive Waste Management Agency (Andra), in order for the review of the creation-license application to start in 2015 and, subject to its approval, the commissioning of the repository to take place in 2025. Andra is responsible for siting, designing, implementing, operating the future geological repository, including operational and long term safety and waste acceptance. Nuclear operators (Electricite de France (EDF), AREVA NC, and the French Commission in charge of Atomic Energy and Alternative Energies (CEA) are technically and financially responsible for the waste they generate, with no limit in time. They provide Andra, on one hand, with waste packages related input data, and on the other hand with their long term industrial experiences of high and intermediate-level long-lived radwaste management and nuclear operation. Andra, EDF, AREVA and CEA established a cooperation agreement for strengthening their collaborations in these fields. Within this agreement Andra and the nuclear operators have defined an industrial program for waste management. This program includes the waste inventory to be taken into account for the design of the Cigeo project and the structural hypothesis underlying its phased development. It schedules the delivery of the different categories of waste and defines associated flows. (authors)

  5. Industrial Program of Waste Management - Cigeo Project - 13033

    International Nuclear Information System (INIS)

    Butez, Marc; Bartagnon, Olivier; Gagner, Laurent; Advocat, Thierry; Sacristan, Pablo; Beguin, Stephane

    2013-01-01

    The French Planning Act of 28 June 2006 prescribed that a reversible repository in a deep geological formation be chosen as the reference solution for the long-term management of high-level and intermediate-level long-lived radioactive waste. It also entrusted the responsibility of further studies and design of the repository (named Cigeo) upon the French Radioactive Waste Management Agency (Andra), in order for the review of the creation-license application to start in 2015 and, subject to its approval, the commissioning of the repository to take place in 2025. Andra is responsible for siting, designing, implementing, operating the future geological repository, including operational and long term safety and waste acceptance. Nuclear operators (Electricite de France (EDF), AREVA NC, and the French Commission in charge of Atomic Energy and Alternative Energies (CEA) are technically and financially responsible for the waste they generate, with no limit in time. They provide Andra, on one hand, with waste packages related input data, and on the other hand with their long term industrial experiences of high and intermediate-level long-lived radwaste management and nuclear operation. Andra, EDF, AREVA and CEA established a cooperation agreement for strengthening their collaborations in these fields. Within this agreement Andra and the nuclear operators have defined an industrial program for waste management. This program includes the waste inventory to be taken into account for the design of the Cigeo project and the structural hypothesis underlying its phased development. It schedules the delivery of the different categories of waste and defines associated flows. (authors)

  6. Bridging the Divide between Safety and Risk Management for your Project or Program

    Science.gov (United States)

    Lutomski, Mike

    2005-01-01

    This presentation will bridge the divide between these separate but overlapping disciplines and help explain how to use Risk Management as an effective management decision support tool that includes safety. Risk Management is an over arching communication tool used by management to prioritize and effectively mitigate potential problems before they concur. Risk Management encompasses every kind of potential problem that can occur on a program or project. Some of these are safety issues such as hazards that have a specific likelihood and consequence that need to be controlled and included to show an integrated picture of accepted) mitigated, and residual risk. Integrating safety and other assurance disciplines is paramount to accurately representing a program s or projects risk posture. Risk is made up of several components such as technical) cost, schedule, or supportability. Safety should also be a consideration for every risk. The safety component can also have an impact on the technical, cost, and schedule aspect of a given risk. The current formats used for communication of safety and risk issues are not consistent or integrated. The presentation will explore the history of these disciplines, current work to integrate them, and suggestions for integration for the future.

  7. National Ignition Facility Project Site Safety Program

    International Nuclear Information System (INIS)

    Dun, C

    2003-01-01

    This Safety Program for the National Ignition Facility (NIF) presents safety protocols and requirements that management and workers shall follow to assure a safe and healthful work environment during activities performed on the NIF Project site. The NIF Project Site Safety Program (NPSSP) requires that activities at the NIF Project site be performed in accordance with the ''LLNL ES and H Manual'' and the augmented set of controls and processes described in this NIF Project Site Safety Program. Specifically, this document: (1) Defines the fundamental NIF site safety philosophy. (2) Defines the areas covered by this safety program (see Appendix B). (3) Identifies management roles and responsibilities. (4) Defines core safety management processes. (5) Identifies NIF site-specific safety requirements. This NPSSP sets forth the responsibilities, requirements, rules, policies, and regulations for workers involved in work activities performed on the NIF Project site. Workers are required to implement measures to create a universal awareness that promotes safe practice at the work site and will achieve NIF management objectives in preventing accidents and illnesses. ES and H requirements are consistent with the ''LLNL ES and H Manual''. This NPSSP and implementing procedures (e.g., Management Walkabout, special work procedures, etc.,) are a comprehensive safety program that applies to NIF workers on the NIF Project site. The NIF Project site includes the B581/B681 site and support areas shown in Appendix B

  8. Managing Stress. Project Seed.

    Science.gov (United States)

    Muto, Donna; Wilk, Jan

    One of eight papers from Project Seed, this paper describes a stress management project undertaken with high school sophomores. Managing Stress is described as an interactive workshop that offers young people an opportunity to examine specific areas of stress in their lives and to learn effective ways to deal with them. The program described…

  9. Plutonium immobilization project development and testing technical project office quality assurance program description

    International Nuclear Information System (INIS)

    Gould, T.H.; MacLean, L.M.; Ziemba, J.M.

    1999-01-01

    The Plutonium Immobilization Project (PIP) is one of several fissile materials disposition projects managed by the Department of Energy (DOE) Office of Fissile Materials Disposition (OFMD). The PIP is expected to evolve from the current Development and Testing (D and T) effort, to design, to construction, and finally to operations. Overall management and technical management of the D and T effort resides at the Lead Laboratory, Lawrence Livermore National Laboratory (LLNL), through the LLNL Manager, Fissile Materials Disposition Program (FMDP). Day to day project activities are managed by the D and T Technical Project Office (TPO), which reports to the LLNL Manager, FMDP. The D and T TPO consists of the Technical Manager, the TPO Quality Assurance (QA) Program Manager, and TPO Planning and Support Staff. This Quality Assurance Program Description (QAPD) defines the QA policies and controls that will be implemented by these TPO personnel in their management of D and T activities. This QAPD is consistent with and responsive to the Department of Energy Fissile Materials Disposition Program Quality Assurance Requirements Document (FMDP QARD). As the Project and upper level requirement's documents evolve, this QAPD will be updated as necessary to accurately define and describe the QA Program and Management of the PIP. The TPO has a policy that all development and testing activities be planned, performed and assessed in accordance with its customer's requirements, needs and expectations, and with a commitment to excellence and continuous improvement. The TPO QAPD describes implementation requirements which, when completed, will ensure that the project development and testing activities conform to the appropriate QA requirements. For the program to be effective, the TPO QA Program Manager will ensure that each site participating in D and T activities has developed a QAPD, which meets the customer's requirements, and has a designated quality leader in place. These customer

  10. WIPP Project Records Management Handbook

    International Nuclear Information System (INIS)

    1991-01-01

    The Waste Isolation Pilot Plant (WIPP) Records Management Handbook provides the WIPP Project Records Management personnel with a tool to use to fulfill the requirements of the WIPP Records Program and direct their actions in the important area of records management. The handbook describes the various project areas involved in records management, and how they function. The handbook provides the requirements for Record Coordinators and Master Record Center (MRC) personnel to follow in the normal course of file management, records scheduling, records turnover, records disposition, and records retrieval. More importantly, the handbook provides a single reference which encompasses the procedures set fourth in DOE Order 1324.2A, ''Records Disposition'' ASME NQA-1, ''Quality Assurance Program Requirements for Nuclear Facilities'' and DOE-AL 5700.6B, ''General Operations Quality Assurance.'' These documents dictate how an efficient system of records management will be achieved on the WIPP Project

  11. Software Tools Streamline Project Management

    Science.gov (United States)

    2009-01-01

    Three innovative software inventions from Ames Research Center (NETMARK, Program Management Tool, and Query-Based Document Management) are finding their way into NASA missions as well as industry applications. The first, NETMARK, is a program that enables integrated searching of data stored in a variety of databases and documents, meaning that users no longer have to look in several places for related information. NETMARK allows users to search and query information across all of these sources in one step. This cross-cutting capability in information analysis has exponentially reduced the amount of time needed to mine data from days or weeks to mere seconds. NETMARK has been used widely throughout NASA, enabling this automatic integration of information across many documents and databases. NASA projects that use NETMARK include the internal reporting system and project performance dashboard, Erasmus, NASA s enterprise management tool, which enhances organizational collaboration and information sharing through document routing and review; the Integrated Financial Management Program; International Space Station Knowledge Management; Mishap and Anomaly Information Reporting System; and management of the Mars Exploration Rovers. Approximately $1 billion worth of NASA s projects are currently managed using Program Management Tool (PMT), which is based on NETMARK. PMT is a comprehensive, Web-enabled application tool used to assist program and project managers within NASA enterprises in monitoring, disseminating, and tracking the progress of program and project milestones and other relevant resources. The PMT consists of an integrated knowledge repository built upon advanced enterprise-wide database integration techniques and the latest Web-enabled technologies. The current system is in a pilot operational mode allowing users to automatically manage, track, define, update, and view customizable milestone objectives and goals. The third software invention, Query

  12. NEW INSTRUMENTS FOR MANAGEMENT OF CONSTRUCTION PROGRAMS AND PROJECTS IN THE NEW ECONOMY STRUCTURE

    Directory of Open Access Journals (Sweden)

    Silka Dmitriy Nikolaevich

    2017-11-01

    Full Text Available Subject: the new economy structure is directly related to the active application of digital technologies. Economic processes are more formalized and for making administrative decisions it becomes possible to operate in a greater degree with precise criteria and information than probabilistic assumptions. As a subject of research, new tools for managing construction programs and projects are presented. Research objectives: the purpose of the study is to formulate general principles and directions for the digitization of economic relations in investment and construction activities to ensure the effectiveness of implementation of new generation projects. Materials and methods: to achieve the goal, the article shows the composition of state programs and projects in the construction sector and the system problems of their implementation. Organizational methods of increasing their effectiveness are considered. Results: the most promising areas of implementation of new management tools for investment and construction programs and projects are identified. Conclusions: the article shows the current dynamics of changes in technical and socio-economic systems at the level of construction sector. It is pointed out that the tasks of socio-economic nature require the development of unique approaches since the peculiarities of Russian legislation, of the prevailing norms and rules of economic activity prevent the direct replication of successful foreign experience.

  13. The standard for program management

    CERN Document Server

    2017-01-01

    The Standard for Program Management – Fourth Edition differs from prior editions by focusing on the principles of good program management. Program activities have been realigned to program lifecycle phases rather than topics, and the first section was expanded to address the key roles of program manager, program sponsor and program management office. It has also been updated to better align with PMI’s Governance of Portfolios, Programs, and Projects: A Practice Guide.

  14. 76 FR 9028 - Training Program for Regulatory Project Managers; Information Available to Industry

    Science.gov (United States)

    2011-02-16

    ...] Training Program for Regulatory Project Managers; Information Available to Industry AGENCY: Food and Drug... Duvall-Miller, Center for Drug Evaluation and Research, Food and Drug Administration, 10903 New Hampshire... to provide the following: (1) Firsthand exposure to industry's drug development processes and (2) a...

  15. 75 FR 10806 - Training Program for Regulatory Project Managers; Information Available to Industry

    Science.gov (United States)

    2010-03-09

    ...] Training Program for Regulatory Project Managers; Information Available to Industry AGENCY: Food and Drug... INFORMATION CONTACT: Beth Duvall-Miller, Center for Drug Evaluation and Research, Food and Drug Administration... to provide the following: (1) First hand exposure to industry's drug development processes and (2) a...

  16. 77 FR 10538 - Training Program for Regulatory Project Managers; Information Available to Industry

    Science.gov (United States)

    2012-02-22

    ...] Training Program for Regulatory Project Managers; Information Available to Industry AGENCY: Food and Drug... Brum, Center for Drug Evaluation and Research, Food and Drug Administration, 10903 New Hampshire Ave...) Firsthand exposure to industry's drug development processes and (2) a venue for sharing information about...

  17. Tank Focus Area Pretreatment Program. FY 1995 Program Management Plan

    International Nuclear Information System (INIS)

    Morrison, M.I.; McGinnis, C.P.; Wilkenson, W.T.; Hunt, R.D.

    1995-02-01

    This program management plan (PMP) describes the FY 1995 project plans for the Pretreatment Program of the Tank Focus Area. The Tank Focus Area is one of five areas of environmental concerns originally identified by the Deputy Assistant Secretary for Technology Development (EM-50). Projects in the Tank Focus Area relate to the remediation of liquid waste stored in underground storage tanks at various US Department of Energy sites. The Pretreatment Program is an organizational unit performing work within the Tank Focus Area. The function of the Pretreatment Program is to develop, test, evaluate, and demonstrate new technologies, with emphasis on separations. The 11 Pretreatment Program projects for FY 1995 are (1) Cesium Extraction Testing, (2) Comprehensive Supernate Treatment, (3) Hot Cell Studies, (4) Cesium Removal Demonstration, (5) Out-of-Tank Evaporator Demonstration, (6) Crossflow Filtration, (7) Technical Interchange with CEA, (8) TRUEX Applications, (9) NAC/NAG Process Studies (conducted at Oak Ridge National Laboratory), (10) NAC/NAG Process and Waste Form Studies (conducted at Florida International University), and (11) Program Management. Section 2 of this PMP contains a separate subsection for each FY 1995 project. A brief description of the project, a schedule of major milestones, and a breakdown of costs are provided for each project. The PMP also contains sections that describe the project controls that are in place. Quality assurance, document control, the project management system, and the management organization are described in these sections

  18. Data Overload Impact on Project Management: How Knowledge Management Systems Can Improve Federal Agencies Effectiveness

    Science.gov (United States)

    Rodriguez, Jacinto

    2013-01-01

    This mixed method exploratory case study was used to explore the effect data overload has on project management, how data overload affects project management effectiveness, how prepared program office staff is to manage multiple projects effectively, and how the program office's organizational structure and data management systems affect project…

  19. Project Management Methods in Projects Co-financed by EU Funds

    OpenAIRE

    Kostalova, Jana; Tetrevova, Libena; Patak, Michal

    2017-01-01

    This paper deals with the management of projects co-financed by European Union funds (structural funds and the Cohesion Fund) in the Czech Republic (EU projects). The authors aimed to analyze and assess the scope of familiarity with basic project management methods and their application within the implementation of EU projects in the Czech Republic in the Programming Period 2007–2013. Based on a questionnaire survey of EU project organisers, the authors evaluate their attitudes to project man...

  20. Global Project Management: Graduate Course

    National Research Council Canada - National Science Library

    Beranek, Thomas R

    2006-01-01

    ..., A. James Clark School of Engineering - Project Management Program. The course slides and suggested readings provide a general exploration of the nuances of doing projects globally as compared to domestically...

  1. A program-level management system for the life cycle environmental and economic assessment of complex building projects

    International Nuclear Information System (INIS)

    Kim, Chan-Joong; Kim, Jimin; Hong, Taehoon; Koo, Choongwan; Jeong, Kwangbok; Park, Hyo Seon

    2015-01-01

    Climate change has become one of the most significant environmental issues, of which about 40% come from the building sector. In particular, complex building projects with various functions have increased, which should be managed from a program-level perspective. Therefore, this study aimed to develop a program-level management system for the life-cycle environmental and economic assessment of complex building projects. The developed system consists of three parts: (i) input part: database server and input data; (ii) analysis part: life cycle assessment and life cycle cost; and (iii) result part: microscopic analysis and macroscopic analysis. To analyze the applicability of the developed system, this study selected ‘U’ University, a complex building project consisting of research facility and residential facility. Through value engineering with experts, a total of 137 design alternatives were established. Based on these alternatives, the macroscopic analysis results were as follows: (i) at the program-level, the life-cycle environmental and economic cost in ‘U’ University were reduced by 6.22% and 2.11%, respectively; (ii) at the project-level, the life-cycle environmental and economic cost in research facility were reduced 6.01% and 1.87%, respectively; and those in residential facility, 12.01% and 3.83%, respective; and (iii) for the mechanical work at the work-type-level, the initial cost was increased 2.9%; but the operation and maintenance phase was reduced by 20.0%. As a result, the developed system can allow the facility managers to establish the operation and maintenance strategies for the environmental and economic aspects from a program-level perspective. - Highlights: • A program-level management system for complex building projects was developed. • Life-cycle environmental and economic assessment can be conducted using the system. • The design alternatives can be analyzed from the microscopic perspective. • The system can be used to

  2. A program-level management system for the life cycle environmental and economic assessment of complex building projects

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Chan-Joong [Parsons Brinckerhoff, Seoul 135-763 (Korea, Republic of); Kim, Jimin; Hong, Taehoon; Koo, Choongwan; Jeong, Kwangbok; Park, Hyo Seon [Department of Architectural Engineering, Yonsei University, Seoul 120-749 (Korea, Republic of)

    2015-09-15

    Climate change has become one of the most significant environmental issues, of which about 40% come from the building sector. In particular, complex building projects with various functions have increased, which should be managed from a program-level perspective. Therefore, this study aimed to develop a program-level management system for the life-cycle environmental and economic assessment of complex building projects. The developed system consists of three parts: (i) input part: database server and input data; (ii) analysis part: life cycle assessment and life cycle cost; and (iii) result part: microscopic analysis and macroscopic analysis. To analyze the applicability of the developed system, this study selected ‘U’ University, a complex building project consisting of research facility and residential facility. Through value engineering with experts, a total of 137 design alternatives were established. Based on these alternatives, the macroscopic analysis results were as follows: (i) at the program-level, the life-cycle environmental and economic cost in ‘U’ University were reduced by 6.22% and 2.11%, respectively; (ii) at the project-level, the life-cycle environmental and economic cost in research facility were reduced 6.01% and 1.87%, respectively; and those in residential facility, 12.01% and 3.83%, respective; and (iii) for the mechanical work at the work-type-level, the initial cost was increased 2.9%; but the operation and maintenance phase was reduced by 20.0%. As a result, the developed system can allow the facility managers to establish the operation and maintenance strategies for the environmental and economic aspects from a program-level perspective. - Highlights: • A program-level management system for complex building projects was developed. • Life-cycle environmental and economic assessment can be conducted using the system. • The design alternatives can be analyzed from the microscopic perspective. • The system can be used to

  3. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  4. Lightning Mapper Sensor Lens Assembly S.O. 5459: Project Management Plan

    Science.gov (United States)

    Zeidler, Janet

    1999-01-01

    Kaiser Electro-Optics, Inc. (KEO) has developed this Project Management Plan for the Lightning Mapper Sensor (LMS) program. KEO has integrated a team of experts in a structured program management organization to meet the needs of the LMS program. The project plan discusses KEO's approach to critical program elements including Program Management, Quality Assurance, Configuration Management, and Schedule.

  5. The Future of Project Management in Technical Communication

    DEFF Research Database (Denmark)

    Kampf, Constance

    2006-01-01

    Project Management increasing shapes workplace communication, especially when technical commuicators participate in cross-disciplinary development teams. This paper looks at the future of project management in technical communication and argues for a communicative approach to project management...... for technical communication students. The Project Management course in the International Bachelor Program of Marketing and Management Communication at the Aarhus School of Business is described, and the implications fortechnical communication curricula are discussed....

  6. MG SPROUTS: A Project-in-a-Box Approach to Educational Programming

    Science.gov (United States)

    Dorn,Sheri; Slagle, Krissy

    2016-01-01

    MG SPROUTS was developed as a "project-in-a-box" program, a self-contained educational programming tool for Extension agents working with master gardener Extension volunteers (MGEVs). The program design incorporates programmatic materials and project management materials and follows best management practices for volunteer management. MG…

  7. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    Full Text Available Modern management theory treats all complex tasks and duties like projects and make these projects possible to be managed by a particular organizational-management concept in order to achieve a goal effectively. A large number of jobs and tasks performed in the system of defense or for defense purposes have the characteristics of projects. Project management is both a skill and a science of monitoring human, material, financial, energy and other resources to achieve required objectives within the given limits: deadlines, time, budget, possibility of realization and the satisfaction of the interests of all project participants. Project management is a traditional area of applied (or functional management focused on managing complex and uncertain situations with defined goals. Introduction In conditions of rapid change and high uncertainty, only adaptive organizations survive, i. e. those that are able not only to react quickly to changes but also to proactively take advantage of changes. Development of project management The biggest influence on the development of the area had complex jobs within the engineering profession. In parallel with the traditional approach new approaches began to develop, while the traditional one still remained in use. Contrary to the traditional engineering approach, a dynamic model first developed in order to respond to demands for greater control of costs. Project management Project management is a skill and knowledge of human and material resources to achieve set objectives within prescribed limits: deadlines, time, budget, possibility of realization, and the satisfaction of all participants in the project. In order to realize a project effectively, it is necessary to manage it rationally. Planning and project management A project plan is a document that allows all team members insight on where to go, when to start and when to arrive, what is necessary to be done in order to achieve the project objectives and what

  8. Agile project management managing for success

    CERN Document Server

    Crowder, James A

    2015-01-01

    Management and enables them to deal with the demands and complexities of modern, agile systems/software/hardware development teams. The book examines the project/program manager beyond the concepts of leadership and aims to connect to employees' sense of identity. The text examines human psychological concepts such as "locus of control," which will help the manager understand their team members' view and how best to manage their "world" contributions. The authors cover new management tools and philosophies for agile systems/software/hardware development teams, with a specific focus on how this

  9. 24 CFR 990.275 - Project-based management (PBM).

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are arranged...

  10. Knowledge management program

    International Nuclear Information System (INIS)

    Henderson, T.

    2013-01-01

    To capture and retain the CANDU experience from a wider CANDU base and transfer knowledge and experience to our members, supplier participants and universities in a cost effective manner. Major focus area of the program is knowledge management joint projects, generic training delivery, inter-utilities mentoring and technical support, public education programs. The path forward is execution of transition of OPG NPDS Program as an ongoing program in COG with member funding, pursue opportunities to provide member utilities with additional leadership and train-the-trainer training and grow the knowledge management activities by 20% per year based on 2013/2014 results.

  11. Knowledge management program

    Energy Technology Data Exchange (ETDEWEB)

    Henderson, T. [CANDU Owners' Group, Toronto, Ontario (Canada)

    2013-07-01

    To capture and retain the CANDU experience from a wider CANDU base and transfer knowledge and experience to our members, supplier participants and universities in a cost effective manner. Major focus area of the program is knowledge management joint projects, generic training delivery, inter-utilities mentoring and technical support, public education programs. The path forward is execution of transition of OPG NPDS Program as an ongoing program in COG with member funding, pursue opportunities to provide member utilities with additional leadership and train-the-trainer training and grow the knowledge management activities by 20% per year based on 2013/2014 results.

  12. Project Management in Public Administration. TPM – Total Project Management Maturity Model. The Case of Slovenian Public Administration

    Directory of Open Access Journals (Sweden)

    Gordana ŽURGA

    2018-02-01

    Full Text Available The purpose of the article is to present the importance of project management for the functioning of public administration, and its contribution to the realization of the developmental goals of the government. For this, integration of strategic management and project management is of vital importance. The methodology used is a combination of literature review, a case study of project management in public administration of the Republic of Slovenia, and development of a maturity model of project management in public administration, with its verifi cation on the case of Slovenia. The main contribution of the study is development of TPM – Total Project Management maturity model for public administration. Upon the TPM maturity model, project management in Slovene public administration is assessed and discussed. Out of fi ve maturity levels, the results for project management in Slovene public administration are: management of projects – level 2 (initiated, management of programs of projects – level 2 (initiated, management of portfolios of projects – level 3 (implemented, organizational support for project management – level 3 (implemented, HRM for project management – level 2 (initiated, and integration of project management and strategic management – level 3 (implemented. General fi ndings and recommendations in this respect are drawn, together with indicated areas for possible further research and investigation.

  13. ENVIRONMENTAL MANAGEMENT SCIENCE PROGRAM RESEARCH PROJECTS TO IMPROVE DECONTAMINATION AND DECOMMISIONING OF U.S. DEPARTMENT OF ENERGY FACILITIES

    International Nuclear Information System (INIS)

    Phillips, Ann Marie

    2003-01-01

    This paper describes fourteen basic science projects aimed at solving decontamination and decommissioning (D and D) problems within the U.S. Department of Energy (DOE). Funded by the Environmental Science Management Program (EMSP), these research projects address D and D problems where basic science is needed to expand knowledge and develop solutions to help DOE meet its cleanup milestones. EMSP uses directed solicitations targeted at identified Environmental Management (EM) needs to ensure that research results are directly applicable to DOE's EM problems. The program then helps transition the projects from basic to applied research by identifying end-users and coordinating proof-of-principle field tests. EMSP recently funded fourteen D and D research projects through the directed solicitation process. These research projects will be discussed, including description, current status, and potential impact. Through targeted research and proof-of-principle tests, it is hoped that EMSP's fourteen D and D basic research projects will directly impact and provide solutions to DOE's D and D problems

  14. ENVIRONMENTAL MANAGEMENT SCIENCE PROGRAM RESEARCH PROJECTS TO IMPROVE DECONTAMINATION AND DECOMMISIONING OF U.S. DEPARTMENT OF ENERGY FACILITIES

    Energy Technology Data Exchange (ETDEWEB)

    Phillips, Ann Marie

    2003-02-27

    This paper describes fourteen basic science projects aimed at solving decontamination and decommissioning (D&D) problems within the U.S. Department of Energy (DOE). Funded by the Environmental Science Management Program (EMSP), these research projects address D&D problems where basic science is needed to expand knowledge and develop solutions to help DOE meet its cleanup milestones. EMSP uses directed solicitations targeted at identified Environmental Management (EM) needs to ensure that research results are directly applicable to DOE's EM problems. The program then helps transition the projects from basic to applied research by identifying end-users and coordinating proof-of-principle field tests. EMSP recently funded fourteen D&D research projects through the directed solicitation process. These research projects will be discussed, including description, current status, and potential impact. Through targeted research and proof-of-principle tests, it is hoped that EMSP's fourteen D&D basic research projects will directly impact and provide solutions to DOE's D&D problems.

  15. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  16. RISK MANAGEMENT USING PROJECT RECON

    Science.gov (United States)

    2016-11-28

    centralized database . • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any...Create growth plans to proactively capture benefits • Customize reports to group opportunities by programmatic, technical, business, contracting, and

  17. Making Things Happen Mastering Project Management

    CERN Document Server

    Berkun, Scott

    2008-01-01

    In the updated edition of this critically acclaimed and bestselling book, Microsoft insider Scott Berkun offers a collection of essays on field-tested philosophies and strategies for defining, leading, and managing projects. Based on his nine years of experience as a program manager for Microsoft's biggest projects, Berkun explains to technical and non-technical readers alike what it takes to get through a large software or web development project.

  18. Tools for Closure Project and Contract Management: Development of the Rocky Flats Integrated Closure Project Baseline

    International Nuclear Information System (INIS)

    Gelles, C. M.; Sheppard, F. R.

    2002-01-01

    This paper details the development of the Rocky Flats Integrated Closure Project Baseline - an innovative project management effort undertaken to ensure proactive management of the Rocky Flats Closure Contract in support of the Department's goal for achieving the safe closure of the Rocky Flats Environmental Technology Site (RFETS) in December 2006. The accelerated closure of RFETS is one of the most prominent projects within the Department of Energy (DOE) Environmental Management program. As the first major former weapons plant to be remediated and closed, it is a first-of-kind effort requiring the resolution of multiple complex technical and institutional challenges. Most significantly, the closure of RFETS is dependent upon the shipment of all special nuclear material and wastes to other DOE sites. The Department is actively working to strengthen project management across programs, and there is increasing external interest in this progress. The development of the Rocky Flats Integrated Closure Project Baseline represents a groundbreaking and cooperative effort to formalize the management of such a complex project across multiple sites and organizations. It is original in both scope and process, however it provides a useful precedent for the other ongoing project management efforts within the Environmental Management program

  19. Quality assurance program plan for cesium legacy project

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Cesium Legacy Project. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP). These activities include all aspects of cask transportation, project related operations within the 324 Building, and waste management as it relates to the specific activities of this project. General facility activities (i.e. 324 Building Operations, Central Waste Complex Operations, etc.) are covered in other appropriate QAPPs. The 324 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a B and W Hanford Company (BWHC) managed facility. During this transition process existing PNNL procedures and documents will be utilized until replaced by BWHC procedures and documents

  20. Hazardous Waste Remedial Actions Program: integrating waste management

    International Nuclear Information System (INIS)

    Petty, J.L.; Sharples, F.E.

    1986-01-01

    The Hazardous Waste Remedial Actions Program was established to integrate Defense Programs' activities in hazardous and mixed waste management. The Program currently provides centralized planning and technical support to the Office of the Assistant Secretary for Defense Programs. More direct project management responsibilities may be assumed in the future. The Program, under the direction of the ASDP's Office of Defense Waste and Transportation Management, interacts with numerous organizational entities of the Department. The Oak Ridge Operations Office has been designated as the Lead Field Office. The Program's four current components cover remedial action project identification and prioritization; technology adaptation; an informative system; and a strategy study for long-term, ''corporate'' project and facility planning

  1. Project management in nuclear equipment manufacture

    International Nuclear Information System (INIS)

    Liu Jiancheng

    2005-01-01

    The completion of the management organization shall be firstly considered in project management for a nuclear power plant. The organization of nuclear equipment quality assurance program and project management consists of 5 departments such as the nuclear power container department, the manufacture department and the quality assurance department. The general manager takes the overall responsibility for the quality of the nuclear press usr bearing equipment, and the vice general manager takes responsibility for the quality, technology and schedule related with the manufacture of the equipment, and organizes the organization department for the audit. The director of the quality assurance department takes the responsibility for the establishment and completion of the quality assurance program, with enough rights authorized by the general manager, including the right not bounded by the cost and schedule, and confirms the implementation of the program by related departments and personnel. The manufacture schedule shall be prepared to ensure the implementation feasibility, process continuity and flexibility. The schedule shall be followed and monitored for the whole process, to check and feedback the implementation. (authors)

  2. Environmental Management Science Program Workshop. Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-07-01

    The Department of Energy Office of Environmental Management (EM), in partnership with the Office of Energy Research (ER), designed, developed, and implemented the Environmental Management Science Program as a basic research effort to fund the scientific and engineering understanding required to solve the most challenging technical problems facing the government's largest, most complex environmental cleanup program. The intent of the Environmental Management Science Program is to: (1) Provide scientific knowledge that will revolutionize technologies and cleanup approaches to significantly reduce future costs, schedules, and risks. (2) Bridge the gap between broad fundamental research that has wide-ranging applications such as that performed in the Department's Office of Energy Research and needs-driven applied technology development that is conducted in Environmental Management's Office of Science and Technology. (3) Focus the nation's science infrastructure on critical Department of Energy environmental problems. In an effort to share information regarding basic research efforts being funded by the Environmental Management Science Program and the Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program), this CD includes summaries for each project. These project summaries, available in portable document format (PDF), were prepared in the spring of 1998 by the principal investigators and provide information about their most recent project activities and accomplishments.

  3. Project Selection for NASA's R&D Programs

    Science.gov (United States)

    Jones, Harry

    2005-01-01

    The purpose of NASA s Research and Development (R&D) programs is to provide advanced human support technologies for the Exploration Systems Mission Directorate (ESMD). The new technologies must be sufficiently attractive and proven to be selectable for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are likely options for flight. The R&D programs must select an array of technology development projects, manage them, and either terminate or continue them, so as to maximize the delivered number of potentially usable advanced human support technologies. This paper proposes an effective project selection methodology to help manage NASA R&D project portfolios.

  4. AFSC Laboratory Management Information Requirements Project

    National Research Council Canada - National Science Library

    1982-01-01

    This document was developed under the auspices of the Laboratory IRM (LIRM) Management Working Group in response to AFSC Program Directive 0008-81-1, Management Information Requirement Project (23 February 1981...

  5. AVLIS Production Plant Project Management Plan

    International Nuclear Information System (INIS)

    1984-01-01

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables

  6. Unstable slope management program.

    Science.gov (United States)

    2009-08-01

    This Rapid Response Project gathered information on existing unstable slope management programs, with a : focus on asset management practices in the United States and overseas. On the basis of this study, the research : team summarized and recommende...

  7. ORGANIZATIONAL PROJECT MANAGEMENT MATURITY

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2017-11-01

    Full Text Available The present article is aimed at developing a set of recommendations for achieving a higher level of organizational project maturity at a given enterprise. Methodology. For the purposes of the current research, the available information sources on the components of project management system are analysed; the essence of “organizational maturity” and the existing models of organizational maturity are studied. The method of systemic and structural analysis, as well as the method of logical generalization, are employed in order to study the existing models of organizational maturity, to describe levels of organizational maturity, and finally to develop a set of methodological recommendations for achieving a higher level of organizational project maturity at a given enterprise. The results of the research showed that the core elements of project management system are methodological, organizational, programtechnical, and motivational components. Project management encompasses a wide range of issues connected with organizational structure, project team, communication management, project participants, etc. However, the fundamental basis for developing project management concept within a given enterprise starts with defining its level of organizational maturity. The present paper describes various models of organizational maturity (staged, continuous, petal-shaped and their common types (H. Кеrzner Organizational Maturity Model, Berkeley PM Maturity Model, Organizational Project Management Maturity Model, Portfolio, Program & Project Management Maturity Model. The analysis of available theoretic works showed that the notion “organizational project maturity” refers to the capability of an enterprise to select projects and manage them with the intention of achieving its strategic goals in the most effective way. Importantly, the level of maturity can be improved by means of formalizing the acquired knowledge, regulating project-related activities

  8. Project Management

    DEFF Research Database (Denmark)

    Pilkington, Alan; Chai, Kah-Hin; Le, Yang

    2015-01-01

    This paper identifies the true coverage of PM theory through a bibliometric analysis of the International Journal of Project Management from 1996-2012. We identify six persistent research themes: project time management, project risk management, programme management, large-scale project management......, project success/failure and practitioner development. These differ from those presented in review and editorial articles in the literature. In addition, topics missing from the PM BOK: knowledge management project-based organization and project portfolio management have become more popular topics...

  9. 78 FR 7477 - Multistate Corridor Operations and Management Program

    Science.gov (United States)

    2013-02-01

    ... in the Multistate Corridor Operations and Management Program authorized by the Safe, Accountable... projects to improve multimodal transportation system management and operations. This notice seeks... Multistate Corridor Operations and Management (MCOM) programs and projects. The purpose of these investments...

  10. Strategic Context of Project Portfolio Management

    Directory of Open Access Journals (Sweden)

    Nedka Nikolova

    2016-06-01

    Full Text Available In 2014 Bulgaria entered its second programming period (2014-2020 which opened a new stage in the development of project management in our country. Project-oriented companies are entering a new stage in which based on experience and increased design capacity they will develop their potential and will accelerate growth. This poses new challenges for science and business to identify strategic opportunities and formulation of project objectives, programs and portfolios of projects that will increase the competitive potential of companies and the economy as a whole. This article is an expression of the shared responsibility of science to develop the scientific front to solve methodologically difficult and practically new tasks that are derived from the needs to increase the competitive potential of the business-based project approach. The main objective of this study is based on the systematization of the results of theoretical research and development of methodology of Project Portfolio Management to explore the opportunities for its application in Bulgarian industrial companies.

  11. Spent Nuclear Fuel Project Document Management Plan

    International Nuclear Information System (INIS)

    Connor, M.D.; Harizison, G.L.; Rice, W.C.

    1995-12-01

    The SNF Project Document Management Plan identifies and describes the currently available systems and processes for implementing and maintaining an effective document control and records management program. This program governs the methods by which documents are generated, released, distributed, maintained current, retired, and ultimately disposed

  12. Technical program plan, Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    1979-12-01

    The Basalt Waste Isolation Project (BWIP) program as administered by the DOE's Richland Operations Office and Rockwell Hanford Operations is described. The objectives, scope and scientific technologies are discussed. The work breakdown structure of the project includes: project management and support, systems integration, geosciences, hydrology, engineered barriers, test facility design and construction, engineering testing, repository studies, and schedules. The budget of the program including operating and capital cost control is also included

  13. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  14. INFORMATION TECHNOLOGY IN INVESTMENT PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Vjacheslav A. Kozlov

    2014-01-01

    Full Text Available In the article it is proved that use of information technology today is not only something innovative distinctive feature and competitive advantage for organizations, but it is a necessary condition for effective business. The article discusses the main functionality of financial-analytical system Project Expert as an effective tool of investment project management and instrument of business planning. The main advantages which organizations get from Project Expert program use are in detail considered. Thus in the article Project Expert is considered as the effective tool of investment project management which allows to receive a number of advantages and to carry out the qualitative analysis of projects.

  15. Transportation engineering project management : survey of practice.

    Science.gov (United States)

    2017-01-01

    Utah Department of Transportation (UDOT) project managers (PMs) have identified inefficiencies in the legacy : system electronic Program Management (ePM) used to manage consultant contracts and invoices. To help UDOT : prepare for potential system im...

  16. A Symbiosis between Instructional Systems Design and Project Management

    Science.gov (United States)

    Pan, Cheng-Chang

    2012-01-01

    This study is intended to explore a complementary relationship between instructional systems design (ISD) and project management in an attempt to build a plausible case for integrating project management as a distinct course in the core of the graduate instructional systems design programs. It is argued that ISD and project management should form…

  17. A Program Management Framework for Facilities Managers

    Science.gov (United States)

    King, Dan

    2012-01-01

    The challenge faced by senior facility leaders is not how to execute a single project, but rather, how to successfully execute a large program consisting of hundreds of projects. Senior facilities officers at universities, school districts, hospitals, airports, and other organizations with extensive facility inventories, typically manage project…

  18. Groundwater protection management program plan

    International Nuclear Information System (INIS)

    1992-06-01

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ''Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1

  19. Can we talk? Communications management for the Waste Isolation Pilot Plant, a complex nuclear waste management project

    International Nuclear Information System (INIS)

    Goldstein, S.A.; Pullen, G.M.; Brewer, D.R.

    1995-01-01

    Sandia Nuclear Waste Management Program is pursuing for DOE an option for permanently disposing radioactive waste in deep geologic repositories. Included in the Program are the Waste Isolation Pilot Plant (WIPP) Project for US defense program mixed waste the Yucca Mountain Project (YMP) for spent power reactor fuel and vitrified high-level waste, projects for other waste types, and development efforts in environmental decision support technologies. WIPP and YMP are in the public arena, of a controversial nature, and provide significant management challenges. Both projects have large project teams, multiple organization participants, large budgets, long durations, are very complex, have a high degree of programmatic risk, and operate in an extremely regulated environment requiring legal defensibility. For environmental projects like these to succeed, SNL's Program is utilizing nearly all areas in PMI's Project Management Body of Knowledge (PMBOK) to manage along multiple project dimensions such as the physical sciences (e.g., geophysics and geochemistry; performance assessment; decision analysis) management sciences (controlling the triple constraint of performance, cost and schedule), and social sciences (belief systems; public participation; institutional politics). This discussion focuses primarily on communication challenges active on WIPP. How is the WIPP team meeting the challenges of managing communications?'' and ''How are you approaching similar challenges?'' will be questions for a dialog with the audience

  20. Alternative techniques for environmental project management

    International Nuclear Information System (INIS)

    Reeves, S.

    1994-01-01

    Beginning in the late 1970s and early 1980s, increased regulation and recognition of ground water as an important natural resource led industry to address subsurface contamination at many sites. This caused the industry's dependence on environmental consultants to increase drastically. Initially, the accepted practice for addressing environmental concerns was to rely upon consultants to determine appropriate work scope, budgets, procedures and regulatory interaction. While significant advances have been made in technology and consulting services, improvement in project management and cost containment have been limited. In order to effectively manage environmental projects, it is imperative that business risks and standardized project management practices be factored into environmental solutions. A standardized environmental project management program was developed and applied to projects at petroleum marketing facilities throughout the United States. Following development and implementation, detailed studies were conducted to measure the value of standardization in reducing costs and enhancing efficiencies. The results indicate significant improvement in both reducing project costs and in enhancing the efficiency of consultants

  1. “Frontload” in complex project program management to aim for lifetime sustainability of offshore windmill parks

    DEFF Research Database (Denmark)

    Brink, Tove

    2015-01-01

    This paper reveals how project program management can aim for lifetime sustainability of offshore windmill parks through innovation. The research is based on a qualitative focus group interview with 11 enterprises and 6 individual semi-constructed interviews with 6 enterprises. Offshore windmill...

  2. Supplement Analysis for the Watershed Management Program EIS--Tapteal Bend Riparian Corridor Restoration Project

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2004-08-11

    The Bonneville Power Administration is proposing to fund the restoration of approximately 500 feet of streambank along the Yakima River at river mile 8, upstream of the Van Giesen Bridge on SR 224, in and between Richland and West Richland, Washington. This project will also result in the acquisition of Fox Island, a 12-acre island directly across the river from the restoration area. There is no development planned for the island. The proposed project includes: The installation of a bio-engineered streambank that incorporates barbs to capture silt and deflect flow, roughened rock or log toes, a riparian buffer, soil reinforcement, and bank grading. Long-term photo-point and plot sampling will also be implemented to evaluate the effectiveness and success of the restoration project. The NEPA compliance checklist for this project was completed by Darrel Sunday, a contractor with Sunday and Associates, Inc. (April 4, 2004), and meets the standards and guidelines for the Watershed Management Program Environmental Impact Statement (EIS) and Record of Decision (ROD). The Endangered Species Act (ESA) listed species that may occur in the general vicinity of the project area are the pygmy rabbit, bald eagle, bull trout, Ute ladies'-tresses, and mid-Columbia Steelhead. The pygmy rabbit, bald eagle, and Ute ladies'Tresses are not known to occur in the immediate project vicinity, and it was determined that the proposed restoration project would have no effect on these species. It is difficult to determine if bull trout occur within the Tapteal project area and Dave Carl of the Washington Department of Fish & Wildlife was contacted and concurred with this assumption. It was determined that the project may affect, but is not likely to adversely affect bull trout, and the U.S. Fish & Wildlife Service has concurred with that determination (July 28, 2004). For the mid-Columbia Steelhead, an anadromous fish species, BPA has determined that if conducted in accordance with

  3. Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This program management plan describes the scope, objectives, and method of accomplishment for the Martin Marietta Energy Systems, Inc. (Energy Systems) Oak Ridge National laboratory (ORNL) Environmental Restoration (ER) Program. The ORNL ER Program is one of five site program, receiving guidance from and reporting to the Energy Systems ER Division. Therefore, all ORNL ER policies and procedures are consistent with ER Division policies and procedures. This plan covers all ORNL ER activities, the participants involved in these activities (and their roles and responsibilities), and all phases of the remediation process. This plan will also serve as a template that may be supplemented as necessary to produce individual project management plans for specific projects. This document explains how the Energy Systems ORNL ER Program does business, so the ORNL ER Program`s management structure is illustrated in detail. Personnel are matrixed to the ER Program from other organizations to assist with specific projects. This plan identifies positions at the program level and discusses responsibilities and interactions with positions at the project level. This plan includes sections that describe requirements for project plans, work breakdown structures, schedules, project management and cost control systems, and information and reporting. Project management plans will utilize the work breakdown structure and dictionary pages in the appropriate life cycle baseline report This plan describes the information that should be contained in ORNL ER project management plans. The most important milestones are primary documents relating to the management and remediation of contaminated sites. Primary document milestones are subject to stipulated penalties and receive paramount attention.

  4. Qualification program of the ASTRID SFR project: definition, methodology and associated risk evaluation and management - 15093

    International Nuclear Information System (INIS)

    Rodriguez, G.; Dirat, J.F.; Traina, A.; Christofari, M.

    2015-01-01

    The Preconceptual Design phase of the ASTRID French Sodium Fast Reactor project had the objective to integrate innovative options to meet the requirements of the 4. generation reactors and to comply with the related specifications. It was followed by the conceptual phase studies (AVP2 phase 2013-2015) where some technical options are left opened with an advanced option and a backup alternative. In the same time of the AVP2 phase studies, the qualification program related to ASTRID project was initiated. It consists in collecting the exhaustive list of research/development (R/D) needs and technological demonstration tests to be fulfilled on representative mockup prior to component implementation in the prototype. The ASTRID Qualification Program (AQP) objectives are to collect needs expressed by all engineering companies involved in ASTRID, and then to organize the answer to this expression of needs. This significant work of needs compilation has been divided in several tasks, according to the ASTRID project decomposition in the Product Breakdown Structure (PBS). Compilation of needs was jointly performed by engineering company, R/D responsible and coordinated by the ASTRID Qualification project responsible. It was associated with an evaluation of the maturity level of the technical options thanks to a Technological Readiness Level grid (TRL ranking table), an identification of major risks, and an evaluation of the R/D potentiality and associated facility platform. The methodology applied for the ASTRID Qualification Program (AQP) is presented. It is explained what methodology was used associated to the TRL process, and how is managed the associated risk analysis evaluation: evaluation of major risks, definition of a risk portfolio and a corresponding Action Plan for risk reduction (synthesized under the REM acronym: Risk Evaluation and Management). This methodology is a mean used to facilitate ASTRID risk-informed decision making, technology qualification and

  5. Can we talk? Communications management for the Waste Isolation Pilot Plant, a complex nuclear waste management project

    Energy Technology Data Exchange (ETDEWEB)

    Goldstein, S.A.; Pullen, G.M.; Brewer, D.R.

    1995-07-01

    Sandia Nuclear Waste Management Program is pursuing for DOE an option for permanently disposing radioactive waste in deep geologic repositories. Included in the Program are the Waste Isolation Pilot Plant (WIPP) Project for US defense program mixed waste the Yucca Mountain Project (YMP) for spent power reactor fuel and vitrified high-level waste, projects for other waste types, and development efforts in environmental decision support technologies. WIPP and YMP are in the public arena, of a controversial nature, and provide significant management challenges. Both projects have large project teams, multiple organization participants, large budgets, long durations, are very complex, have a high degree of programmatic risk, and operate in an extremely regulated environment requiring legal defensibility. For environmental projects like these to succeed, SNL`s Program is utilizing nearly all areas in PMI`s Project Management Body of Knowledge (PMBOK) to manage along multiple project dimensions such as the physical sciences (e.g., geophysics and geochemistry; performance assessment; decision analysis) management sciences (controlling the triple constraint of performance, cost and schedule), and social sciences (belief systems; public participation; institutional politics). This discussion focuses primarily on communication challenges active on WIPP. How is the WIPP team meeting the challenges of managing communications?`` and ``How are you approaching similar challenges?`` will be questions for a dialog with the audience.

  6. FLUOR HANFORD SAFETY MANAGEMENT PROGRAMS

    Energy Technology Data Exchange (ETDEWEB)

    GARVIN, L. J.; JENSEN, M. A.

    2004-04-13

    This document summarizes safety management programs used within the scope of the ''Project Hanford Management Contract''. The document has been developed to meet the format and content requirements of DOE-STD-3009-94, ''Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses''. This document provides summary descriptions of Fluor Hanford safety management programs, which Fluor Hanford nuclear facilities may reference and incorporate into their safety basis when producing facility- or activity-specific documented safety analyses (DSA). Facility- or activity-specific DSAs will identify any variances to the safety management programs described in this document and any specific attributes of these safety management programs that are important for controlling potentially hazardous conditions. In addition, facility- or activity-specific DSAs may identify unique additions to the safety management programs that are needed to control potentially hazardous conditions.

  7. The Waste Isolation Pilot Plant (WIPP) integrated project management system

    International Nuclear Information System (INIS)

    Olona, D.; Sala, D.

    1993-01-01

    The Waste Isolation Pilot Plant (WIPP), located 26 miles east of Carlsbad, New Mexico, is a research and development project of the Department of Energy (DOE), tasked with the mission of demonstrating the safe disposal of transuranic (TRU) radioactive wastes. This unique project was authorized by Congress in 1979 in response to the national need for long-term, safe methods for disposing of radioactive by-products from our national defense programs. The WIPP was originally established in December of 1979, by Public Law 96-164, DOE National Security and Military Applications of Nuclear Energy Authorization Act of 1980. Since the inception of the WIPP Project, work has continued to prepare the facility to receive TRU wastes. Studies continue to be conducted to demonstrate the safety of the WIPP facility in accordance with federal and state laws, state agreements, environmental regulations, and DOE Orders. The objectives of implementing an integrated project management system are to assure compliance with all regulatory and federal regulations, identify areas of concern, provide justification for funding, provide a management tool for control of program workscope, and establish a project baseline from which accountability and performance will be assessed. Program management and project controls are essential for the success of the WIPP Project. The WIPP has developed an integrated project management system to establish the process for the control of the program which has an expected total dollar value of $2B over the ten-year period from 1990-2000. The implementation of this project management system was motivated by the regulatory requirements of the project, the highly public environment in which the project takes place, limited funding and resources, and the dynamic nature of the project. Specific areas to be addressed in this paper include strategic planning, project organization, planning and scheduling, fiscal planning, and project monitoring and reporting

  8. How does one develop the right quality assurance program for waste management projects?

    International Nuclear Information System (INIS)

    Hedges, D.

    1988-01-01

    The quality assurance requirements in use today for radioactive waste facilities, geologic repositories and hazardous waste projects were developed initially for the nuclear power plant industry, and their intent is being applied to regulations and guidance documents to radioactive and hazardous waste programs. The wording of the Nuclear Regulatory Commission (NRC) quality assurance (QA) requirements in Appendix B of 10CFR50, the related guidance documents and the industry's ANSI/ASME NQA-1 were developed over a period of several years to address quality assurance for the design and construction of the complex and interactive systems to produce electrical power using nuclear fuel. Now, those same documents are the basis for the quality assurance requirements and guidance for waste management facilities and repositories. The intent of Appendix B of 10CFR50 and NQA-1 can easily be applied to waste projects providing one understands and uses the intent of the requirements. This paper describes the intent of existing QA requirements as they apply to radioactive and hazardous waste programs. Methods of ensuring that the quality assurance program design will be acceptable to DOE and regulatory agencies are illustrated

  9. How does one develop the right quality assurance program for waste management projects?

    International Nuclear Information System (INIS)

    Hedges, D.

    1988-01-01

    The quality assurance requirements in use today for radioactive waste facilities, geologic repositories and hazardous waste projects were developed initially for the nuclear power plant industry, and their intent is being applied by regulations and guidance documents to radioactive and hazardous waste programs. The wording of the NRC quality assurance requirements in Appendix B of 10CFR50, the related guidance documents and the industry's ANSI/ASME NQA-1 were developed over a period of several years to address quality assurance for the design and construction of the complex and interactive systems to produce electrical power using nuclear fuel. Now, those same documents are the basis for the quality assurance requirements and guidance for waste management facilities and repositories. The intent of Appendix B of 10CFR50 and NQA-1 can easily be applied to waste projects, providing one understands and uses the intent of the requirements. This paper describes the intent of existing QA requirements as they apply to radioactive and hazardous waste programs. Methods of ensuring that the quality assurance program design will be acceptable to DOE and regulatory agencies are illustrated

  10. Project Management

    DEFF Research Database (Denmark)

    Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015.......Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015....

  11. Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program

    International Nuclear Information System (INIS)

    1994-07-01

    This program management plan describes the scope, objectives, and method of accomplishment for the Martin Marietta Energy Systems, Inc. (Energy Systems) Oak Ridge National laboratory (ORNL) Environmental Restoration (ER) Program. The ORNL ER Program is one of five site program, receiving guidance from and reporting to the Energy Systems ER Division. Therefore, all ORNL ER policies and procedures are consistent with ER Division policies and procedures. This plan covers all ORNL ER activities, the participants involved in these activities (and their roles and responsibilities), and all phases of the remediation process. This plan will also serve as a template that may be supplemented as necessary to produce individual project management plans for specific projects. This document explains how the Energy Systems ORNL ER Program does business, so the ORNL ER Program's management structure is illustrated in detail. Personnel are matrixed to the ER Program from other organizations to assist with specific projects. This plan identifies positions at the program level and discusses responsibilities and interactions with positions at the project level. This plan includes sections that describe requirements for project plans, work breakdown structures, schedules, project management and cost control systems, and information and reporting. Project management plans will utilize the work breakdown structure and dictionary pages in the appropriate life cycle baseline report This plan describes the information that should be contained in ORNL ER project management plans. The most important milestones are primary documents relating to the management and remediation of contaminated sites. Primary document milestones are subject to stipulated penalties and receive paramount attention

  12. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Tamara Gvozdenovic

    2008-03-01

    Full Text Available One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviations from the previously set quality standards. Basic processes of project quality management are: quality planning, quality assurance and quality control.

  13. Global Security Program Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bretzke, John C. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-03-25

    The Global Security Directorate mission is to protect against proliferant and unconventional nuclear threats –regardless of origin - and emerging new threats. This mission is accomplished as the Los Alamos National Laboratory staff completes projects for our numerous sponsors. The purpose of this Program Management Plan is to establish and clearly describe the GS program management requirements including instructions that are essential for the successful management of projects in accordance with our sponsor requirements. The detailed information provided in this document applies to all LANL staff and their subcontractors that are performing GS portfolio work. GS management is committed to a culture that ensures effective planning, execution, and achievement of measurable results in accordance with the GS mission. Outcomes of such a culture result in better communication, delegated authority, accountability, and increased emphasis on safely and securely achieving GS objectives.

  14. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    OpenAIRE

    Tamara Gvozdenovic; Mirjana Miljanovic; Aleksandar Jegdic; Zeljko Crnogorcic

    2008-01-01

    One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviatio...

  15. HISPANIC ENVIRONMENTAL AND WASTE MANAGEMENT OUTREACH PROJECT

    International Nuclear Information System (INIS)

    Sebastian Puente

    1998-01-01

    The Department of Energy Office of Environmental Management (DOE-EM) in cooperation with the Self Reliance Foundation (SRF) is conducting the Hispanic Environmental and Waste Management Outreach Project (HEWMO) to increase science and environmental literacy, specifically that related to nuclear engineering and waste management in the nuclear industry, among the US Hispanic population. The project will encourage Hispanic youth and young adults to pursue careers through the regular presentation of Spanish-speaking scientists and engineers and other role models, as well as career information on nationally broadcast radio programs reaching youth and parents. This project will encourage making science, mathematics, and technology a conscious part of the everyday life experiences of Hispanic youth and families. The SRF in collaboration with the Hispanic Radio Network (HRN) produces and broadcasts radio programs to address the topics and meet the objectives as outlined in the Environmental Literacy Plan and DOE-EM Communications Plan in this document. The SRF has in place a toll-free ''800'' number Information and Resource Referral (I and RR) service that national radio program listeners can call to obtain information and resource referrals as well as give their reactions to the radio programs that will air. HRN uses this feature to put listeners in touch with local organizations and resources that can provide them with further information and assistance on the related program topics

  16. HISPANIC ENVIRONMENTAL AND WASTE MANAGEMENT OUTREACH PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Sebastian Puente

    1998-07-25

    The Department of Energy Office of Environmental Management (DOE-EM) in cooperation with the Self Reliance Foundation (SRF) is conducting the Hispanic Environmental and Waste Management Outreach Project (HEWMO) to increase science and environmental literacy, specifically that related to nuclear engineering and waste management in the nuclear industry, among the US Hispanic population. The project will encourage Hispanic youth and young adults to pursue careers through the regular presentation of Spanish-speaking scientists and engineers and other role models, as well as career information on nationally broadcast radio programs reaching youth and parents. This project will encourage making science, mathematics, and technology a conscious part of the everyday life experiences of Hispanic youth and families. The SRF in collaboration with the Hispanic Radio Network (HRN) produces and broadcasts radio programs to address the topics and meet the objectives as outlined in the Environmental Literacy Plan and DOE-EM Communications Plan in this document. The SRF has in place a toll-free ''800'' number Information and Resource Referral (I and RR) service that national radio program listeners can call to obtain information and resource referrals as well as give their reactions to the radio programs that will air. HRN uses this feature to put listeners in touch with local organizations and resources that can provide them with further information and assistance on the related program topics.

  17. The Marshall Islands Data Management Program

    Energy Technology Data Exchange (ETDEWEB)

    Stoker, A.C.; Conrado, C.L.

    1995-09-01

    This report is a resource document of the methods and procedures used currently in the Data Management Program of the Marshall Islands Dose Assessment and Radioecology Project. Since 1973, over 60,000 environmental samples have been collected. Our program includes relational database design, programming and maintenance; sample and information management; sample tracking; quality control; and data entry, evaluation and reduction. The usefulness of scientific databases involves careful planning in order to fulfill the requirements of any large research program. Compilation of scientific results requires consolidation of information from several databases, and incorporation of new information as it is generated. The success in combining and organizing all radionuclide analysis, sample information and statistical results into a readily accessible form, is critical to our project.

  18. The Marshall Islands Data Management Program

    International Nuclear Information System (INIS)

    Stoker, A.C.; Conrado, C.L.

    1995-09-01

    This report is a resource document of the methods and procedures used currently in the Data Management Program of the Marshall Islands Dose Assessment and Radioecology Project. Since 1973, over 60,000 environmental samples have been collected. Our program includes relational database design, programming and maintenance; sample and information management; sample tracking; quality control; and data entry, evaluation and reduction. The usefulness of scientific databases involves careful planning in order to fulfill the requirements of any large research program. Compilation of scientific results requires consolidation of information from several databases, and incorporation of new information as it is generated. The success in combining and organizing all radionuclide analysis, sample information and statistical results into a readily accessible form, is critical to our project

  19. The Nordic nuclear safety program 1994-1997. Project handbook

    International Nuclear Information System (INIS)

    1997-06-01

    This is a new revision of the handbook for administrators of the Nordic reactor safety program NKS. The most important administrative functions in project management are described, which should secure a uniform management approach in all the projects. The description of the organizational scheme of the NKS and distribution of responsibilities is followed by examples of various administrative routines and document forms. In the annex the names and addresses of the staff involved in administration of the NKS program are listed. (EG)

  20. Disease management projects and the Chronic Care Model in action: baseline qualitative research.

    Science.gov (United States)

    Walters, Bethany Hipple; Adams, Samantha A; Nieboer, Anna P; Bal, Roland

    2012-05-11

    Disease management programs, especially those based on the Chronic Care Model (CCM), are increasingly common in The Netherlands. While disease management programs have been well-researched quantitatively and economically, less qualitative research has been done. The overall aim of the study is to explore how disease management programs are implemented within primary care settings in The Netherlands; this paper focuses on the early development and implementation stages of five disease management programs in the primary care setting, based on interviews with project leadership teams. Eleven semi-structured interviews were conducted at the five selected sites with sixteen professionals interviewed; all project directors and managers were interviewed. The interviews focused on each project's chosen chronic illness (diabetes, eating disorders, COPD, multi-morbidity, CVRM) and project plan, barriers to development and implementation, the project leaders' action and reactions, as well as their roles and responsibilities, and disease management strategies. Analysis was inductive and interpretive, based on the content of the interviews. After analysis, the results of this research on disease management programs and the Chronic Care Model are viewed from a traveling technology framework. This analysis uncovered four themes that can be mapped to disease management and the Chronic Care Model: (1) changing the health care system, (2) patient-centered care, (3) technological systems and barriers, and (4) integrating projects into the larger system. Project leaders discussed the paths, both direct and indirect, for transforming the health care system to one that addresses chronic illness. Patient-centered care was highlighted as needed and a paradigm shift for many. Challenges with technological systems were pervasive. Project leaders managed the expenses of a traveling technology, including the social, financial, and administration involved. At the sites, project leaders served

  1. THE EVALUATION OF THE IMPLEMENTATION OF CONTRACTOR SAFETY MANAGEMENT SYSTEM (CSMS PROGRAM ON TURNAROUND PROJECT (TA AT PT. PUPUK SRIWIDJAJA (PUSRI PALEMBANG

    Directory of Open Access Journals (Sweden)

    Muhammad Arif

    2016-03-01

    Full Text Available Background :Turnaround is one of the done by contractor in which if it is not managed well, it could cause work accident. The purpose of this study was to evaluate the implementation of contractor safety management system (CSMS program on turnaround project at PT. Pupuk Sriwidjaja Palembang. Method : This study was a qualitative study. The information was obtained from deep interview, observation and the study of document. The data was analyzed by using content analysis. The validity of the instruments was tested through triangulation of sources, method and data Result : The program implementation Contractor Safety Management System (CSMS on a turnaround project is already well underway only on projects in addition to departments turnaround K3 & LH less involved in the risk assessment stage, pre-qualification and selection of contractors. Conclusion : The implementation of the program Contractor Safety Management System (CSMS on a turnaround project at PT. Pupuk Sriwidjaja Palembang are in accordance with the Code of Labor Management Health, Safety and Environmental Protection Contractor BPMIGAS. It is advisable to PT. Pupuk Sriwidjaja Palembang in order to improve communication between departments procure goods and services with K3 and LH-related departments work tendered as the risk assessment stage, pre-qualification and selection on work tendered. Need sanctions against contractors who do not regularly report performance data K3.

  2. Project Management and the Project Manager: A Strategy for ...

    African Journals Online (AJOL)

    International Journal of Development and Management Review ... collapse, project failure, project abandonment, project cost and time overruns, etc. ... component parts that constitute project management in the building construction industry.

  3. The Woodworker's Website: A Project Management Case Study

    Science.gov (United States)

    Jance, Marsha

    2014-01-01

    A case study that focuses on building a website for a woodworking business is discussed. Project management and linear programming techniques can be used to determine the time required to complete the website project discussed in the case. This case can be assigned to students in an undergraduate or graduate decision modeling or management science…

  4. Environmental Restoration Information Resource Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  5. Disease management projects and the Chronic Care Model in action: baseline qualitative research

    Science.gov (United States)

    2012-01-01

    Background Disease management programs, especially those based on the Chronic Care Model (CCM), are increasingly common in the Netherlands. While disease management programs have been well-researched quantitatively and economically, less qualitative research has been done. The overall aim of the study is to explore how disease management programs are implemented within primary care settings in the Netherlands; this paper focuses on the early development and implementation stages of five disease management programs in the primary care setting, based on interviews with project leadership teams. Methods Eleven semi-structured interviews were conducted at the five selected sites with sixteen professionals interviewed; all project directors and managers were interviewed. The interviews focused on each project’s chosen chronic illness (diabetes, eating disorders, COPD, multi-morbidity, CVRM) and project plan, barriers to development and implementation, the project leaders’ action and reactions, as well as their roles and responsibilities, and disease management strategies. Analysis was inductive and interpretive, based on the content of the interviews. After analysis, the results of this research on disease management programs and the Chronic Care Model are viewed from a traveling technology framework. Results This analysis uncovered four themes that can be mapped to disease management and the Chronic Care Model: (1) changing the health care system, (2) patient-centered care, (3) technological systems and barriers, and (4) integrating projects into the larger system. Project leaders discussed the paths, both direct and indirect, for transforming the health care system to one that addresses chronic illness. Patient-centered care was highlighted as needed and a paradigm shift for many. Challenges with technological systems were pervasive. Project leaders managed the expenses of a traveling technology, including the social, financial, and administration involved

  6. Project management plan for the gunite and associated tanks treatability studies project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-12-01

    This plan for the Gunite and Associated Tanks (GAAT) Treatability Studies Project satisfies the requirements of the program management plan for the Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program as established in the Program Management Plan for the Martin Marietta Energy Systems, Inc., Oak Ridge National Laboratory Site Environmental Restoration Program. This plan is a subtier of several other ER documents designed to satisfy the US Department of Energy (DOE) Order 4700.1 requirement for major systems acquisitions. This project management plan identifies the major activities of the GAAT Treatability Studies Project; establishes performance criteria; discusses the roles and responsibilities of the organizations that will perform the work; and summarizes the work breakdown structure, schedule, milestones, and cost estimate for the project

  7. Pile Structure Program, Projected Start Date : January 1, 2010 (Implementation).

    Energy Technology Data Exchange (ETDEWEB)

    Collins, Chris; Corbett, Catherine [Lower Columbia River Estuary Partnership; Ebberts, Blaine [U.S. Army Corps of Engineers

    2009-07-27

    The 2008 Federal Columbia River Power System Biological Opinion includes Reasonable and Prudent Alternative 38-Piling and Piling Dike Removal Program. This RPA directs the Action Agencies to work with the Estuary Partnership to develop and implement a piling and pile dike removal program. The program has since evolved to include modifying pile structures to enhance their habitat value and complexity by adding large woody debris. The geographic extent of the Pile Structure Program (PSP) includes all tidally-influenced portions of the lower Columbia River below Bonneville Dam; however, it will focus on the mainstem. The overarching goal of the PSP is to enhance and restore ecosystem structure and function for the recovery of federally listed salmonids through the active management of pile structures. To attain this goal, the program team developed the following objectives: (1) Develop a plan to remove or modify pile structures that have lower value to navigation channel maintenance, and in which removal or modification will present low-risk to adjacent land use, is cost-effective, and would result in increased ecosystem function. (2) Determine program benefits for juvenile salmonids and the ecosystem through a series of intensively monitored pilot projects. (3) Incorporate best available science and pilot project results into an adaptive management framework that will guide future management by prioritizing projects with the highest benefits. The PSP's hypotheses, which form the basis of the pilot project experiments, are organized into five categories: Sediment and Habitat-forming Processes, Habitat Conditions and Food Web, Piscivorous Fish, Piscivorous Birds, and Toxic Contaminant Reduction. These hypotheses are based on the effects listed in the Estuary Module (NOAA Fisheries in press) and others that emerged during literature reviews, discussions with scientists, and field visits. Using pilot project findings, future implementation will be adaptively managed

  8. Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan

    International Nuclear Information System (INIS)

    Baide, D.G.; Webster, T.L.

    1995-12-01

    The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list

  9. UMTRA Project Administrative Files Collection Records Management Program

    International Nuclear Information System (INIS)

    1994-09-01

    The UPAFC Records Management Plan is based on the life cycle of a record - the evolution of a record from creation until final disposition. There are three major phases in the life cycle of a record: (1) creation and receipt, (2) maintenance and use, and (3) disposition. Accordingly, the Records Management Plan is structured to follow each of those phases. During each of the three phases, some kind of control is mandatory. The Records Management Plan establishes appropriate standards, policies, and procedures to ensure adequate control is always maintained. It includes a plan for records management, a plan for records management training activities, and a plan for auditing and appraising the program

  10. Environmental Restoration Information Resource Management Program Plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program's essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan

  11. 7 CFR 1948.78 - Growth management and housing planning projects.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Growth management and housing planning projects. 1948... Impacted Area Development Assistance Program § 1948.78 Growth management and housing planning projects. (a) Existing plans for growth management and housing may be used to meet the planning requirements of this...

  12. Pu-238 Supply Program Project Execution Plan

    International Nuclear Information System (INIS)

    Wham, Robert M.; Martin, Sherman

    2012-01-01

    This Pu-238 Supply Program Project Execution Plan (PEP) summarizes critical information and processes necessary to manage the program. The PEP is the primary agreement regarding planning and objectives between The Department of Energy Office of Nuclear Energy (DOE NE-75), Oak Ridge National Laboratory Site Office (OSO) and the Oak Ridge National Laboratory (ORNL). The acquisition executive (AE) will approve the PEP. The PEP is a living document that will be reviewed and revised periodically until the project is complete. The purpose of the project is to reestablish the capability to produce plutonium-238 (Pu-238) domestically. This capability consists primarily of procedures, processes, and design information, not capital assets. As such, the project is not subject to the requirements of DOE O 413.3B, but it will be managed using the project management principles and best practices defined there. It is likely that some capital asset will need to be acquired to complete tasks within the project. As these are identified, project controls and related processes will be updated as necessary. Because the project at its initiation was envisioned to require significant capital assets, Critical Decision 0 (CD-0) was conducted in accordance with DOE O 413.3B, and the mission need was approved on December 9, 2003, by William Magwood IV, director of the Office of Nuclear Energy (NE), Science and Technology, DOE. No date was provided for project start-up at that time. This PEP is consistent with the strategy described in the June 2010 report to Congress, Start-up Plan for Plutonium-238 Production for Radioisotope Power Systems.

  13. Modern project-management

    CERN Multimedia

    CERN. Geneva

    2003-01-01

    This lecture will focus on the following issues: - The current state of the art in Project Management, especially the integration of Project Management with general management activities, and the integrated view of resources allocation. - Overview of the project life cycle, the phases and the deliverables - Necessity and limits of planning in a research environment - Organizational aspects of the projects the roles of the stakeholders - How to get the resources when they are needed - Risk Management in Projects - Earned value - How to keep a project on track (schedule and budget) - Management of the suppliers - Closing of the project

  14. Using management action plans to integrate program improvement efforts

    Energy Technology Data Exchange (ETDEWEB)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N. [Project Performance Corporation, Sterling, VA (United States)

    1994-12-31

    The Department of Energy`s (DOE`s) Environmental Management Program is the country`s largest and most sophisticated environmental program to date. The rapid expansion of the DOE`s environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program`s management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities.

  15. Nurse managers' challenges in project management.

    Science.gov (United States)

    Suhonen, Marjo; Paasivaara, Leena

    2011-11-01

    To analyse the challenges that nurse managers meet in project management. Project management done by nurse managers has a significant role in the success of projects conducted in work units. The data were collected by open interviews (n = 14). The participants were nurse managers, nurses and public health nurses. Data analysis was carried out using qualitative content analysis. The three main challenges nurse managers faced in project management in health-care work units were: (1) apathetic organization and management, (2) paralysed work community and (3) cooperation between individuals being discouraged. Nurse managers' challenges in project management can be viewed from the perspective of the following paradoxes: (1) keeping up projects-ensuring patient care, (2) enthusiastic management-effective management of daily work and (3) supporting the work of a multiprofessional team-leadership of individual employees. It is important for nurse managers to learn to relate these paradoxes to one another in a positive way. Further research is needed, focusing on nurse managers' ability to promote workplace spirituality, nurse managers' emotional intelligence and their enthusiasm in small projects. © 2011 Blackwell Publishing Ltd.

  16. Projected oriented organizations as development of enterprise management methods

    Directory of Open Access Journals (Sweden)

    S.I. Pavlova

    2016-12-01

    Full Text Available Dynamic external environment, significant shortage of product life cycle, increase of product technological difficulty, extension of innovative knowledge motivates managers to look for and use in their activities keys that will provide constant, stable development of organizational structures. The methodology of project enterprise management meets the requirements of «preservation through development». The articles researches the integration of methods and procedures of project management into the enterprise management system. Project management philosophy is the efficient way of existence in the competitive environment and the means for internal development of a company. The author conducts an analysis, determines the essence and peculiarities of a project-oriented enterprise, performs comparing characteristics of functional and project management, describes the stages of gradual transformation of an enterprise organizational structure into a project-oriented one. It is defined that a project-oriented enterprise is that one which functions on the base of innovative development and are scientific, creative and widely use the project activity as the means of a steady development. The article describes internal and external instruments of project management, base knowledge systems on project management and possibilities of enterprises on audit of state of system project management in an enterprise according to the IPMA certification program on the territory of Ukraine.

  17. Opportunity, risk, and success recognizing, addressing, and balancing multiple factors crucial to the success of a project management system deployed to support multi-lateral decommissioning programs

    International Nuclear Information System (INIS)

    Funk, Greg; Longsworth, Paul

    2007-01-01

    This paper addresses the factors involved in effectively implementing a world-class program/project management information system funded by multiple nations. Along with many other benefits, investing in and utilizing such systems improves delivery and drive accountability for major expenditures. However, there are an equally large number of impediments to developing and using such systems. To be successful, the process requires a dynamic combining of elements and strategic sequencing of initiatives. While program/project-management systems involve information technologies, software and hardware, they represent only one element of the overall system.. Technology, process, people and knowledge must all be integrated and working in concert with one another to assure a fully capable system. Major system implementations occur infrequently, and frequently miss established targets in relatively small organizations (with the risk increasing with greater complexity). The European Bank of Reconstruction (EBRD) is midway through just such an implementation. The EBRD is using funds from numerous donor countries to sponsor development of an overarching program management system. The system will provide the Russian Federation with the tools to effectively manage prioritizing, planning, and physically decommissioning assets i n northwest Russia to mitigate risks associated the Soviet era nuclear submarine program. Project-management delivery using world-class techniques supported by aligned systems has been proven to increase the probability of delivering on-time and on-budget, assuring those funding such programs optimum value for money. However, systems deployed to manage multi-laterally funded projects must be developed with appropriate levels of consideration given to unique aspects such as: accommodation of existing project management methods, consideration for differences is management structures and organizational behaviors, incorporation of unique strengths, and subtle

  18. Management of Software Development Projects

    Directory of Open Access Journals (Sweden)

    Felician ALECU

    2011-04-01

    Full Text Available Any major software development starts with the Initiating process group. Once the charter document is approved, the Planning and then to the Executing stages will follow. Monitoring and Controlling is measuring the potential performance deviation of the project in terms of schedule and costs and performs the related Integrated Change Control activities. At the end, during the Closing, the program/project manager will check the entire work is completed and the objectives are met.

  19. Using management action plans to integrate program improvement efforts

    International Nuclear Information System (INIS)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N.

    1994-01-01

    The Department of Energy's (DOE's) Environmental Management Program is the country's largest and most sophisticated environmental program to date. The rapid expansion of the DOE's environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program's management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities

  20. Project management plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory. Environmental Restoration Program

    International Nuclear Information System (INIS)

    1995-01-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place nineteen former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S ampersand M) and as quickly and economically as possible. Implementation and completion of the deactivation project win further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S ampersand M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project

  1. Management & Communication: Project Management Case Study

    CERN Multimedia

    Nathalie Dumeaux

    2004-01-01

    We are pleased to announce the recent launch of a new workshop on Project Management. This is designed for People with budgetary, scheduling and/or organizational responsibilities in a project or a sub-project. The objectives through a management case study specially suited to CERN are: to become familiar with modern management techniques in use for structuring, planning, scheduling, costing and progress monitoring of a project or a sub-project. to understand in-depth issues associated with Deliverable-oriented Project Management, Earned Value Management, Advanced Project Cost Engineering and Project Risk Management. The full description of this workshop can be found here. The next session will be held on 8 October 2004. If you are interested in this workshop, please contact Nathalie Dumeaux, email or 78144. Programme of Seminars October to December 2004 Situation : 21.09.2004 Séminaires bilingues Dates Jours Places disponibles Project Management Case study 8 October 1 oui Intr...

  2. Practice and innovation on safety management of Haiyang Nuclear Power Project

    International Nuclear Information System (INIS)

    Wei Guohu

    2011-01-01

    From the perspective of owner, this article has introduced the safety management model and practice of Haiyang Nuclear Power Project, one of AP1000 Self-reliance Program supporting projects of China. And the article has summarized characteristics of the safety management of Haiyang Project for reference and communication with nuclear or other projects. (author)

  3. Measurement of Software Project Management Effectiveness

    Science.gov (United States)

    2008-12-01

    factors such as advertisement of project mission, top management support, client consultation, personnel issues, client acceptance, etc. Trouble...and PERT (Program/Project Evaluation and Review Technique) and CPM (Critical Path Analysis) charts are process models, and the development of Gantt...models (such as Gantt, PERT and CPM ) got wide-acceptance in industry, as Fuggetta (2000) pointed out few (if any) of the proposed PMLs and related

  4. Quality assurance program plan for SNF characterization support project

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Spent Nuclear Fuel Characterization Support Project. This QAPP has been developed specifically for the Spent Nuclear Fuel Characterization Support Project, per Letter of Instruction (LOI) from Duke Engineering and Services Company, letter No. DESH-9655870, dated Nov. 22, 1996. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP) and LOI. These activities include installation of sectioning equipment and furnace, surface and subsurface examinations, sectioning for metallography, and element drying and conditioning testing, as well as project related operations within the 327 facility as it relates to the specific activities of this project. General facility activities are covered in other appropriate QA-PPS. In addition, this QAPP supports the related quality assurance activities addressed in CM-2-14, Hazardous Material Packaging and Shipping,1261 and HSRCM-1, Hanford Site Radiological Control Manual. The 327 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a Babcock and Wilcox Hanford Company (BVMC) managed facility. During this transition process existing procedures and documents will be utilized until replaced by BVMC procedures and documents. These documents conform to the requirements found in PNL-MA-70, Quality Assurance Manual and PNL-MA-8 1, Hazardous Materials Shipping Manual. The Quality Assurance Program Index (QAPI) contained in Table 1 provides a matrix which shows how project activities relate to IO CFR 830.120 and 5700.6C criteria. Quality Assurance program requirements will be addressed separate from the requirements specified in this document. Other Hanford Site organizations/companies may be utilized in support of this project and the subject organizations are

  5. Project management in building industry management

    Directory of Open Access Journals (Sweden)

    Martin Nový

    2012-01-01

    Full Text Available The article deals with contents of the project management on general level first. It mentions the most widespread project management standards, which have historically developed in global scale, their parts and objectives. Further, it describes position of the building industry in national economy, its specific features distinguishing it from the other industrial production, contents of the building industry management and project management of structures. The importance of the role of project manager is documented by characteristics of construction projects, their course, contents of sub-phases, and individual types of managing activities. Attention is devoted to project planning – determination of realization costs, necessary resources, sequence and time course of individual works. The most frequently used graphic methods of schedule presentation – Gantt chart, network chart and frequency bar chart are applied on examples of constructions. These charts can be focused in time sequence on individual types of resources – workforce, finance, materials, energies, and machinery. In conclusion, necessity to manage the project management procedures is emphasized as a part of skills of a construction engineer in the role of preparation manager or construction project realization manager.

  6. Integration of project management and systems engineering: Tools for a total-cycle environmental management system

    International Nuclear Information System (INIS)

    Blacker, P.B.; Winston, R.

    1997-01-01

    An expedited environmental management process has been developed at the Idaho National Engineering and Environmental Laboratory (INEEL). This process is one result of the Lockheed Martin commitment to the US Department of Energy to incorporate proven systems engineering practices with project management and program controls practices at the INEEL. Lockheed Martin uses a graded approach of its management, operations, and systems activities to tailor the level of control to the needs of the individual projects. The Lockheed Martin definition of systems engineering is: ''''Systems Engineering is a proven discipline that defines and manages program requirements, controls risk, ensures program efficiency, supports informed decision making, and verifies that products and services meet customer needs.'''' This paper discusses: the need for an expedited environmental management process; how the system was developed; what the system is; what the system does; and an overview of key components of the process

  7. National Waste Terminal Storage Program: management and technical program plan, FY 1976--FY 1978

    International Nuclear Information System (INIS)

    1976-01-01

    The discussion on the management plan covers the program, responsibilities, general program schedule and logic, Office of Waste Isolation organization and facilities, management approach, administrative plan, and public affairs plan. The technical program plan includes geological studies, technical support studies, engineering studies, waste facility projects, environmental studies, system studies, data management, and international activities. The information contained in this report is obsolete and of historical interest only

  8. Hydrologic Resources Management Program and Underground Test Area Project FY2005 Progress Report

    International Nuclear Information System (INIS)

    Eaton, G F; Genetti, V; Hu, Q; Hudson, G B; Kersting, A B; Lindvall, R E; Moran, J E; Nimz, G J; Ramon, E C; Rose, T P; Shuller, L; Williams, R W; Zavarin, M; Zhao, P

    2007-01-01

    This report describes FY 2005 technical studies conducted by the Chemical Biology and Nuclear Science Division (CBND) at Lawrence Livermore National Laboratory (LLNL) in support of the Hydrologic Resources Management Program (HRMP) and the Underground Test Area Project (UGTA). These programs are administered by the U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office (NNSA/NSO) through the Defense Programs and Environmental Restoration Divisions, respectively. HRMP-sponsored work is directed toward the responsible management of the natural resources at the Nevada Test Site (NTS), enabling its continued use as a staging area for strategic operations in support of national security. UGTA-funded work emphasizes the development of an integrated set of groundwater flow and contaminant transport models to predict the extent of radionuclide migration from underground nuclear testing areas at the NTS. The report is organized on a topical basis and contains five chapters that highlight technical work products produced by CBND. However, it is important to recognize that most of this work involves collaborative partnerships with the other HRMP and UGTA contract organizations. These groups include the Energy and Environment Directorate at LLNL (LLNL-E and E), Los Alamos National Laboratory (LANL), the Desert Research Institute (DRI), the U.S. Geological Survey (USGS), Stoller-Navarro Joint Venture (SNJV), and Bechtel Nevada (BN)

  9. Federal Energy Efficiency through Utility Partnerships: Federal Energy Management Program (FEMP) Program Overview Fact Sheet

    International Nuclear Information System (INIS)

    Beattie, D.; Wolfson, M.

    2001-01-01

    This Utility Program Overview describes how the Federal Energy Management Program (FEMP) utility program assists Federal energy managers. The document identifies both a utility financing mechanism and FEMP technical assistance available to support agencies' implementation of energy and water efficiency methods and renewable energy projects

  10. Risk Management of NASA Projects

    Science.gov (United States)

    Sarper, Hueseyin

    1997-01-01

    Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

  11. Continuous Risk Management: A NASA Program Initiative

    Science.gov (United States)

    Hammer, Theodore F.; Rosenberg, Linda

    1999-01-01

    NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions.

  12. Climate Change Risk Management: CRE Adaptation Projects and the Risk Management Process

    Science.gov (United States)

    This document describes National Estuary Program partner projects that demonstrate how risk management can be successfully applied to address environmental challenges in our country’s coastal areas.

  13. Project Communications Management

    OpenAIRE

    José C. Santiago-Guevara; Mauricio Rojas-Contreras; Luis A. Esteban-Villamizar

    2013-01-01

    This article presents a review in relation to the object of study: Communications Management as an important factor in the management of projects. The review includes the most relevant and most renowned authors in the field of project management, focusing on telecommunications projects, which lets you define a communications management model.

  14. International Project Management Committee: Overview and Activities

    Science.gov (United States)

    Hoffman, Edward

    2010-01-01

    This slide presentation discusses the purpose and composition of the International Project Management Committee (IMPC). The IMPC was established by members of 15 space agencies, companies and professional organizations. The goal of the committee is to establish a means to share experiences and best practices with space project/program management practitioners at the global level. The space agencies that are involved are: AEB, DLR, ESA, ISRO, JAXA, KARI, and NASA. The industrial and professional organizational members are Comau, COSPAR, PMI, and Thales Alenia Space.

  15. Management plan for the Nuclear Standards Program

    International Nuclear Information System (INIS)

    1979-11-01

    This Management Plan was prepared to describe the manner in which Oak Ridge National Laboratory will provide technical management of the Nuclear Standards Program. The organizational structure that has been established within ORNL for this function is the Nuclear Standards Management Center, which includes the Nuclear Standards Office (NSO) already in existence at ORNL. This plan is intended to support the policies and practices for the development and application of technical standards in ETN projects, programs, and technology developments as set forth in a standards policy memorandum from the DOE Program Director for Nuclear Energy

  16. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  17. New challenges for Life Sciences flight project management

    Science.gov (United States)

    Huntoon, C. L.

    1999-01-01

    Scientists have conducted studies involving human spaceflight crews for over three decades. These studies have progressed from simple observations before and after each flight to sophisticated experiments during flights of several weeks up to several months. The findings from these experiments are available in the scientific literature. Management of these flight experiments has grown into a system fashioned from the Apollo Program style, focusing on budgeting, scheduling and allocation of human and material resources. While these areas remain important to the future, the International Space Station (ISS) requires that the Life Sciences spaceflight experiments expand the existing project management methodology. The use of telescience with state-the-art information technology and the multi-national crews and investigators challenges the former management processes. Actually conducting experiments on board the ISS will be an enormous undertaking and International Agreements and Working Groups will be essential in giving guidance to the flight project management Teams forged in this matrix environment must be competent to make decisions and qualified to work with the array of engineers, scientists, and the spaceflight crews. In order to undertake this complex task, data systems not previously used for these purposes must be adapted so that the investigators and the project management personnel can all share in important information as soon as it is available. The utilization of telescience and distributed experiment operations will allow the investigator to remain involved in their experiment as well as to understand the numerous issues faced by other elements of the program The complexity in formation and management of project teams will be a new kind of challenge for international science programs. Meeting that challenge is essential to assure success of the International Space Station as a laboratory in space.

  18. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Riddle, Donna L.

    2007-05-03

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, “Quality Assurance Requirements,” ANSI/ASQC E4-2004, “Quality Systems for Environmental Data and Technology Programs – Requirements with Guidance for Use,” and ISO 14001-2004, “Environmental Management Systems,” have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, “Quality Assurance Program,” identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, “QA Program Implementation,” identifies the TAC organizations that have responsibility for

  19. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    2007-01-01

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, 'Quality Assurance Requirements', ANSI/ASQC E4-2004, 'Quality Systems for Environmental Data and Technology Programs - Requirements with Guidance for Use', and ISO 14001-2004, 'Environmental Management Systems', have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, 'Quality Assurance Program', identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, 'QA Program Implementation', identifies the TAC organizations that have responsibility for implementing the QA

  20. NPS TINYSCOPE program management

    OpenAIRE

    Turner, Christopher Gordon.

    2010-01-01

    Approved for public release; distribution is unlimited This master's thesis introduces the program management and concept of operations of the TINYSCOPE Program. TINYSCOPE is a 6U CubeSat designed as a low-cost and easily replaceable imaging spacecraft that can produce tactically relevant imagery data. Tactical requirements in this context would emphasize "good enough" image resolution with a rapid-response tasking loop and high revisit rate. The TINYSCOPE project intends to demonstra...

  1. Civilian radioactive waste management program plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy`s site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program`s ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program`s mission and vision, and summarizes the Program`s broad strategic objectives. Chapter 2 describes the Program`s approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program`s organization chart; the Commission`s regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms.

  2. Project stakeholder management

    CERN Document Server

    Eskerod, Pernille

    2013-01-01

    Carrying out a project as planned is not a guarantee for success. Projects may fail because project management does not take the requirements, wishes and concerns of stakeholders sufficiently into account. Projects can only be successful though contributions from stakeholders. And in the end, it is the stakeholders that evaluate whether they find that the project is a success. To manage stakeholders effectively, you need to know your stakeholders, their behaviours and attitudes towards the project. In Project Stakeholder Management, the authors give guidance on how to adopt an analytical and s

  3. Successful project management

    CERN Document Server

    Young, Trevor L

    2016-01-01

    Successful Project Management, 5th edition, is an essential guide for anyone who wants to improve the success rate of their projects. It will help managers to maintain a balance between the demands of the customer, the project, the team and the organization. Covering the more technical aspects of a project from start to completion it contains practised and tested techniques, covering project conception and start-up, how to manage stake holders, effective risk management, project planning and launch and execution. Also including a brand new glossary of key terms, it provides help with evaluating your project as well as practical checklists and templates to ensure success for any ambitious project manager. With over one million copies sold, the hugely popular Creating Success series covers a wide variety of topic, with the latest editions including new chapters such as Tough Conversations and Treating People Right. This indispensable business skills collection is suited to a variety of roles, from someone look...

  4. Managing complex, high risk projects a guide to basic and advanced project management

    CERN Document Server

    Marle, Franck

    2016-01-01

    Maximizing reader insights into project management and handling complexity-driven risks, this book explores propagation effects, non-linear consequences, loops, and the emergence of positive properties that may occur over the course of a project. This book presents an introduction to project management and analysis of traditional project management approaches and their limits regarding complexity. It also includes overviews of recent research works about project complexity modelling and management as well as project complexity-driven issues. Moreover, the authors propose their own new approaches, new methodologies and new tools which may be used by project managers and/or researchers and/or students in the management of their projects. These new elements include project complexity definitions and frameworks, multi-criteria approaches for project complexity measurement, advanced methodologies for project management (propagation studies to anticipate potential behaviour of the project, and clustering approaches...

  5. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  6. Managing a Behavioral Management Program

    DEFF Research Database (Denmark)

    Schapiro, Steve; Lambeth, Susan P.

    2017-01-01

    The behavioral management of captive nonhuman primates (NHPs) can be significantly enhanced through synergistic relationships with noninvasive research projects. Many behavioral and cognitive research procedures are challenging and enriching (physically, cognitively, and/or socially......) for the animals (Hopper et al. 2016; Hopkins and Latzman 2017) without involving any invasive (surgical, biopsy, etc.) procedures. Noninvasive behavioral research programs present the primates with opportunities to choose to voluntarily participate (or not), providing them with greater control over...

  7. Efficient management vital to large, long-term engineering projects

    International Nuclear Information System (INIS)

    Wolfe, P.L.

    1989-01-01

    This article describes the ways in which firms manage large hazardous waste mitigation projects efficiently. Staffing concerns, control systems and report mechanisms critical to effective and timely management of these large-scale programs are explored

  8. Project management in practice : Evaluating a case project through project management theories

    OpenAIRE

    Uusitalo, Jenni

    2013-01-01

    The purpose of this thesis was to evaluate a case project and to study whether it was carried out in a correct manner; meaning that did the case project follow the project management models. In addition, part of the study was to determine what could have been improved in the management of the case project. The case project was about creating and launching a communication channel based on a social media service, on a blog platform called Tumblr, for Team Finland in Spain network. The network p...

  9. Participatory forest management in Ethiopia: learning from pilot projects.

    Science.gov (United States)

    Ameha, Aklilu; Larsen, H O; Lemenih, Mulugeta

    2014-04-01

    Different arrangements of decentralized forest management have been promoted as alternatives to centralized and top down approaches to halt tropical deforestation and forest degradation. Ethiopia is one of the countries piloting one of these approaches. To inform future programs and projects it is essential to learn from existing pilots and experiences. This paper analyses five of the pilot participatory forest management (PFM) programs undertaken in Ethiopia. The study is based on the Forest User Group (FUG) members' analyses of the programs using selected outcome variables: forest income, change in forest conditions, forest ownership feelings and effectiveness of FUGs as forest managing institutions. These variables were assessed at three points in time-before the introduction of PFM, during the project implementation and after the projects ended. Data were collected using group discussions, key informant interviews and transect walks through the PFM forests. The results show that in all of the five cases the state of the forest is perceived to have improved with the introduction of PFM, and in four of the cases the improvement was maintained after projects ended. Regulated access to the forests following introduction of PFM was not perceived to have affected forest income negatively. There are, however, serious concerns about the institutional effectiveness of the FUGs after projects ended, and this may affect the success of the PFM approach in the longer term.

  10. Environmental qualification program for Wolsong project

    International Nuclear Information System (INIS)

    Duggal, A.; Johal, H.; Yee, F.; Suh, S.K.

    1995-01-01

    The Wolsong EQ Program is a process that begins at the design concept stage and continues throughout the operating life of the station. As all components may not have a 30 year service life without periodic maintenance, the EQ Program becomes an important management tool for the owner of the plant. First, the environmental conditions are predicted for the postulated events. Next, suitably qualified equipment is specified and procured. Then the equipment is installed according to specific instructions. Finally, by means of ongoing maintenance and replacement of parts, the qualification of the equipment is maintained during the operating life of the plant. Proper documentation and traceability is required at all stages of the program. As defined in the Wolsong Project Environmental Qualification Design Guide a comprehensive Environmental Qualification (EQ) Program ensures that safety related equipment located in an area in which a harsh environment could occur, can function when required for the life of the station . This program was implemented at the beginning of the Wolsong project. Using this program, components/equipment are qualified prior to installation and a maintenance program is established to keep equipment 'qualified' throughout the station life

  11. Integrated Financial Management Program

    Science.gov (United States)

    Pho, Susan

    2004-01-01

    Having worked in the Employees and Commercial Payments Branch of the Financial Management Division for the past 3 summers, I have seen the many changes that have occurred within the NASA organization. As I return each summer, I find that new programs and systems have been adapted to better serve the needs of the Center and of the Agency. The NASA Agency has transformed itself the past couple years with the implementation of the Integrated Financial Management Program (IFMP). IFMP is designed to allow the Agency to improve its management of its Financial, Physical, and Human Resources through the use of multiple enterprise module applications. With my mentor, Joseph Kan, being the branch chief of the Employees and Commercial Payments Branch, I have been exposed to several modules, such as Travel Manager, WebTads, and Core Financial/SAP, which were implemented in the last couple of years under the IFMP. The implementation of these agency-wide systems has sometimes proven to be troublesome. Prior to IFMP, each NASA Center utilizes their own systems for Payroll, Travel, Accounts Payable, etc. But with the implementation of the Integrated Financial Management Program, all the "legacy" systems had to be eliminated. As a result, a great deal of enhancement and preparation work is necessary to ease the transformation from the old systems to the new. All this work occurs simultaneously; for example, e-Payroll will "go live" in several months, but a system like Travel Manager will need to have information upgraded within the system to meet the requirements set by Headquarters. My assignments this summer have given me the opportunity to become involved with such work. So far, I have been given the opportunity to participate in projects resulting from a congressional request, several bankcard reconciliations, updating routing lists for Travel Manager, updating the majordomo list for Travel Manager approvers and point of contacts, and a NASA Headquarters project involving

  12. Educational Project Management Instructional System. Module Two. Project Management Basic Principles. Volume I--Lessons 1 to 6. Volume II--Lessons 7 to 12. Volume III--Case Simulation.

    Science.gov (United States)

    Cummings, C. Peter; Cook, Desmond L.

    This module is the second in a self-instructional program designed to train public school personnel in how to manage educational projects. The purpose of this module is to provide current or potential project directors with the basic knowledge, skills, abilities, and sensitivities needed to manage a local educational project. In the areas of…

  13. Hanford environmental management program multi-year work plan FY1998

    International Nuclear Information System (INIS)

    Giese, K.A.

    1997-01-01

    The Environmental Support FY 1998 Multi-Year Work Plan (MYWP), consisting of the Hanford Environmental Management Program (HEMP) and the Effluent and Environmental Monitoring (EEM) Program MYWP is prepared to specifically establish the execution year's work scope, budget targets, and schedule baselines. The work plan contains the work breakdown structure (WBS) and the WBS dictionary, milestone listings and milestone description sheets, and cost targets that the program manager will use to manage program work for the fiscal year. Where activities required to maintain or attain compliance with environmental requirements and agreements are impacted as a result of a reduction of the authorized funds, the ''Work Authorization'' identifies the impacted scope and requires the Contracting Officer's or Assistant Manager-Contracting Officer's Representative signature. Change requests will be submitted to RL by the contractor for approval, further documenting the impacts of any environmental and agreement noncompliances as a result of funding limitations. This is the first year that the MYWPs are submitted under the new Project Hanford Management Contractor (PHMC). The MYWPs are structured differently than in prior years. The MYWP is divided into two main sections. Section One is titled the ''Project Summary Section'' and Section Two is titled the ''Additional Sections at the Project Baseline Summaries Level''. Section One is where the major project summary-level information is provided. Section Two is designed to detail the information for each Project Baseline Summary (PBS) that falls under the purview of the major project listed in Section One. Considering all of the PHMC MYWPs, the HEMP and EEM programs are the one exception to the above description. HEMP and EEM are two of five separate programs that are organized under one common PBS that is titled Mission Support (PBS number-sign RL-OT01). RL has given guidance that HEMP and EEM will be submitted as one common MYWP

  14. Software Support for the Classical, Contemporary and Future Project Management

    Directory of Open Access Journals (Sweden)

    Jakov Crnkovic

    2006-04-01

    Full Text Available The volume and complexity of Project Management (PM raises many questions for managers. What exactly are we managing? People? Performance? Efficiency? Effectiveness? Cost? Time? At what levels do projects become challenging and worthy of significant management attention? Can some projects be left on auto-pilot? Must others be managed more aggressively? What metrics are useful in Project Management? How can they be integrated with normal performance metrics in the organization? How can metrics be built into assessment programs that work? How can projects be monitored, re-planned to stay within the original budget and schedule deadlines? How good is the PM software support? Do we really need PM software packages or it should be the integral part of the company's information system (IS? Where is the knowledge about company's previous projects and performance? Are we able to establish company or even industry wide standards for project management? Can we (or should we move from the PMBOK® guidelines and use other approaches? We discussing important questions in PM: software products, responsibilities for concurrently executing several projects (multi-projects with multi objectives and multiple deadlines, introducing a need for initiation, design, execution, and control using a virtual project management and application of the organizational project maturity model.

  15. University Program Management Information System: NASA's University Program Active Projects

    Science.gov (United States)

    Gans, Gary (Technical Monitor)

    2003-01-01

    As basic policy, NASA believes that colleges and universities should be encouraged to participate in the nation's space and aeronautics program to the maximum extent practicable. Indeed, universities are considered as partners with government and industry in the nation's aerospace program. NASA's objective is to have them bring their scientific, engineering, and social research competence to bear on aerospace problems and on the broader social, economic, and international implications of NASA's technical and scientific programs. It is expected that, in so doing, universities will strengthen both their research and their educational capabilities to contribute more effectively to the national well being. This annual report is one means of documenting the NASA-university relationship, frequently denoted, collectively, as NASA's University Program. This report is consistent with agency accounting records, as the data is obtained from NASA's Financial and Contractual Status (FACS) System, operated by the Financial Management Division and the Procurement Office. However, in accordance with interagency agreements, the orientation differs from that required for financial or procurement purposes. Any apparent discrepancies between this report and other NASA procurement or financial reports stem from the selection criteria for the data. This report was prepared by the Office of Education/N.

  16. Designing Project Management

    NARCIS (Netherlands)

    Heintz, John Linke; Lousberg, L.; Wamelink, J.W.F.; Saari, A.; Huovinen, P.

    2016-01-01

    In this paper we introduce the concept of Designing Project Management. On the basis of our earlier work, we suggest that there is still a gap between what is known from recent project management literature and what project managers can structurally help in the effectiveness of their work. Assuming

  17. Civilian radioactive waste management program plan. Revision 2

    International Nuclear Information System (INIS)

    1998-07-01

    This revision of the Civilian Radioactive Waste Management Program Plan describes the objectives of the Civilian Radioactive Waste management Program (Program) as prescribed by legislative mandate, and the technical achievements, schedule, and costs planned to complete these objectives. The Plan provides Program participants and stakeholders with an updated description of Program activities and milestones for fiscal years (FY) 1998 to 2003. It describes the steps the Program will undertake to provide a viability assessment of the Yucca Mountain site in 1998; prepare the Secretary of Energy's site recommendation to the President in 2001, if the site is found to be suitable for development as a repository; and submit a license application to the Nuclear Regulatory Commission in 2002 for authorization to construct a repository. The Program's ultimate challenge is to provide adequate assurance to society that an operating geologic repository at a specific site meets the required standards of safety. Chapter 1 describes the Program's mission and vision, and summarizes the Program's broad strategic objectives. Chapter 2 describes the Program's approach to transform strategic objectives, strategies, and success measures to specific Program activities and milestones. Chapter 3 describes the activities and milestones currently projected by the Program for the next five years for the Yucca Mountain Site Characterization Project; the Waste Acceptance, Storage and Transportation Project; ad the Program Management Center. The appendices present information on the Nuclear Waste Policy Act of 1982, as amended, and the Energy Policy Act of 1992; the history of the Program; the Program's organization chart; the Commission's regulations, Disposal of High-Level Radioactive Wastes in geologic Repositories; and a glossary of terms

  18. Waste Management Project Quality Assurance Program Plan (QAPP)

    International Nuclear Information System (INIS)

    HORHOTA, M.J.

    2000-01-01

    The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence

  19. Quality Assurance Program Plan (QAPP) Waste Management Project

    Energy Technology Data Exchange (ETDEWEB)

    HORHOTA, M.J.

    2000-12-21

    The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence.

  20. Project Management Plan for the INEL technology logic diagrams

    International Nuclear Information System (INIS)

    Rudin, M.J.

    1992-10-01

    This Project Management Plan (PjMP) describes the elements of project planning and control that apply to activities outlined in Technical Task Plan (TTP) ID-121117, ''Technology Logic Diagrams For The INEL.'' The work on this project will be conducted by personnel in EG ampersand G Idaho, Inc.'s Waste Technology Development Program. Technology logic diagrams represent a formal methodology to identify technology gaps or needs within Environmental Restoration/Waste Management Operations, which will focus on Office of Environmental Restoration and Waste Management (EM-50) research and development, demonstration, test, and evaluation efforts throughout the US Department of Energy complex. This PjMP describes the objectives, organization, roles and responsibilities, workscope and processes for implementing and managing the technology logic diagram for the Idaho National Engineering Laboratory project

  1. US DOE surplus facilities management program (SFMP). International technology exchange activities

    International Nuclear Information System (INIS)

    Broderick, J.

    1986-01-01

    The Surplus Facilities Management Program is one of five remedial action programs established by the US Department of Energy (DOE) to eliminate potential hazards to the public and environment from radioactive contamination. These programs provide remedial actions at various facilities and sites previously used by the US Government in national atomic energy programs. Included are uranium ore milling sites, nuclear materials production plants, and research and development facilities. The DOE's five remedial action programs are: the Grand Junction Remedial Action Project; the Formerly Utilized Sites Remedial Action Project; the West Valley Demonstration Project; and the Surplus Facilities Management Program. The Surplus Facilities Management Program (SWMP) was established by DOE in 1978. There are presently over 300 shutdown facilities in the SFMP located at sites across the United States and in Puerto Rico. In some cases, remedial action involves decontaminating and releasing a facility for some other use. In other instances, facilities are completely demolished and removed from the site

  2. Methodologies of Project Management

    Directory of Open Access Journals (Sweden)

    Wojciech Macek

    2011-07-01

    Full Text Available This paper presents comparison of three most popular project management standardsbelonging to a wider group of models (for example, PMBOK, Prince 2, CMMI, ISO 10006,BS 6079, IPMA Competence Baseline, European Commission Project Cycle ManagementGuidelines. The author discusses methods of project management according to PMBoK,Prince 2 and ISO 10006, some chosen criteria and fields of knowledge, such as generalregulations of standards, project range management, resources management, and processesconnected with risk, systems of project quality management.

  3. Adaptive Management for Decision Making at the Program and Project Levels of the Missouri River Recovery Program

    Energy Technology Data Exchange (ETDEWEB)

    Thom, Ronald M.; Anderson, Michael G.; Tyre, Drew; Fleming, Craig A.

    2009-02-28

    The paper, “Adaptive Management: Background for Stakeholders in the Missouri River Recovery Program,” introduced the concept of adaptive management (AM), its principles and how they relate to one-another, how AM is applied, and challenges for its implementation. This companion paper describes how the AM principles were applied to specific management actions within the Missouri River Recovery Program to facilitate understanding, decision-making, and stakeholder engagement. For context, we begin with a brief synopsis of the Missouri River Recovery Program (MRRP) and the strategy for implementing adaptive management (AM) within the program; we finish with an example of AM in action within Phase I of the MRPP.

  4. Your Project Management Coach Best Practices for Managing Projects in the Real World

    CERN Document Server

    Biafore, Bonnie

    2012-01-01

    A pragmatic approach to project management Many projects fail to deliver on time or on budget, or even to deliver a workable product that satisfies the customer. While good project management goes a long way towards ensuring success, managers often fail to follow the plans they implement. This unique guide helps you understand and successfully handle project management, once and for all. Covering practical ways to solve problems you'll typically face when managing actual projects, this pragmatic book takes you through a full project management lifecycle. You'll find ample tips, tricks, and bes

  5. Results of a Survey Software Development Project Management in the U.S. Aerospace Industry. Volume II. Project Management Techniques, Procedures and Tools.

    Science.gov (United States)

    1979-12-18

    I Z I UO W-1 eu 0 - 0 tD CL 0, 0 -I7 NW 2 - x M.j a CL W2 X 41 a ~ 0 0,a 4~~ 0 Z .D .J 0 2. N 0 ~N IU 0 4 - 2 0 ~. 0 Q. ’o ~ 0, 𔃺e U - U ~- 0, 0 -a...0 .44 A A A Ao 0 - 2. -U 2- 4’ A 4’ A o .~ 0 .~ 2. flJ 2. A Ao ~. a 2. 𔃾 2- @2 @2 @2 A 0 .~. a I- 2. Xii - 0 2 @2 ON AXe Re 2- Oi. K A.. A A AU .40...Project manager or person appointed by him SE/ TD project manager b. Senior ADP Manager Director Director computer programming Software program design

  6. Using Focused Laboratory Management and Quality Improvement Projects to Enhance Resident Training and Foster Scholarship

    Science.gov (United States)

    Ford, Bradley A.; Klutts, J. Stacey; Jensen, Chris S.; Briggs, Angela S.; Robinson, Robert A.; Bruch, Leslie A.; Karandikar, Nitin J.

    2017-01-01

    Training in patient safety, quality, and management is widely recognized as an important element of graduate medical education. These concepts have been intertwined in pathology graduate medical education for many years, although training programs face challenges in creating explicit learning opportunities in these fields. Tangibly involving pathology residents in management and quality improvement projects has the potential to teach and reinforce key concepts and further fulfill Accreditation Council for Graduate Medical Education goals for pursuing projects related to patient safety and quality improvement. In this report, we present our experience at a pathology residency program (University of Iowa) in engaging pathology residents in projects related to practical issues of laboratory management, process improvement, and informatics. In this program, at least 1 management/quality improvement project, typically performed during a clinical chemistry/management rotation, was required and ideally resulted in a journal publication. The residency program also initiated a monthly management/informatics series for pathology externs, residents, and fellows that covers a wide range of topics. Since 2010, all pathology residents at the University of Iowa have completed at least 1 management/quality improvement project. Many of the projects involved aspects of laboratory test utilization, with some projects focused on other areas such as human resources, informatics, or process improvement. Since 2012, 31 peer-reviewed journal articles involving effort from 26 residents have been published. Multiple projects resulted in changes in ongoing practice, particularly within the hospital electronic health record. Focused management/quality improvement projects involving pathology residents can result in both meaningful quality improvement and scholarly output. PMID:28913416

  7. Using Focused Laboratory Management and Quality Improvement Projects to Enhance Resident Training and Foster Scholarship.

    Science.gov (United States)

    Krasowski, Matthew D; Ford, Bradley A; Klutts, J Stacey; Jensen, Chris S; Briggs, Angela S; Robinson, Robert A; Bruch, Leslie A; Karandikar, Nitin J

    2017-01-01

    Training in patient safety, quality, and management is widely recognized as an important element of graduate medical education. These concepts have been intertwined in pathology graduate medical education for many years, although training programs face challenges in creating explicit learning opportunities in these fields. Tangibly involving pathology residents in management and quality improvement projects has the potential to teach and reinforce key concepts and further fulfill Accreditation Council for Graduate Medical Education goals for pursuing projects related to patient safety and quality improvement. In this report, we present our experience at a pathology residency program (University of Iowa) in engaging pathology residents in projects related to practical issues of laboratory management, process improvement, and informatics. In this program, at least 1 management/quality improvement project, typically performed during a clinical chemistry/management rotation, was required and ideally resulted in a journal publication. The residency program also initiated a monthly management/informatics series for pathology externs, residents, and fellows that covers a wide range of topics. Since 2010, all pathology residents at the University of Iowa have completed at least 1 management/quality improvement project. Many of the projects involved aspects of laboratory test utilization, with some projects focused on other areas such as human resources, informatics, or process improvement. Since 2012, 31 peer-reviewed journal articles involving effort from 26 residents have been published. Multiple projects resulted in changes in ongoing practice, particularly within the hospital electronic health record. Focused management/quality improvement projects involving pathology residents can result in both meaningful quality improvement and scholarly output.

  8. Program change management during nuclear power plant decommissioning

    International Nuclear Information System (INIS)

    Bushart, Sean; Kim, Karen; Naughton, Michael

    2011-01-01

    Decommissioning a nuclear power plant is a complex project. The project involves the coordination of several different departments and the management of changing plant conditions, programs, and regulations. As certain project Milestones are met, the evolution of such plant programs and regulations can help optimize project execution and cost. This paper will provide information about these Milestones and the plant departments and programs that change throughout a decommissioning project. The initial challenge in the decommissioning of a nuclear plant is the development of a definitive plan for such a complex project. EPRI has published several reports related to decommissioning planning. These earlier reports provided general guidance in formulating a Decommissioning Plan. This Change Management paper will draw from the experience gained in the last decade in decommissioning of nuclear plants. The paper discusses decommissioning in terms of a sequence of major Milestones. The plant programs, associated plans and actions, and staffing are discussed based upon experiences from the following power reactor facilities: Maine Yankee Atomic Power Plant, Yankee Nuclear Power Station, and the Haddam Neck Plant. Significant lessons learned from other sites are also discussed as appropriate. Planning is a crucial ingredient of successful decommissioning projects. The development of a definitive Decommissioning Plan can result in considerable project savings. The decommissioning plants in the U.S. have planned and executed their projects using different strategies based on their unique plant circumstances. However, experience has shown that similar project milestones and actions applied through all of these projects. This allows each plant to learn from the experiences of the preceding projects. As the plant transitions from an operating plant through decommissioning, the reduction and termination of defunct programs and regulations can help optimize all facets of

  9. Managing Projects for Change: Contextualised Project Management

    Science.gov (United States)

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  10. Building a Sustainable Project Management Capacity in Cyprus

    Science.gov (United States)

    Kelly, Steven J.; Esque, Timm J.; Novak, M. Mari; Cermakova, Anna

    2012-01-01

    The performance-driven project management program examined in this article was funded to support a variety of technical assistance efforts designed to strengthen the performance of small and medium enterprises in the Turkish Cypriot community in Cyprus. The customized program combined progressive workshops with hands-on and distance coaching by…

  11. Project Management Yinyang: Coupling project success and client satisfaction

    Directory of Open Access Journals (Sweden)

    Greg Stewart Usher

    2017-06-01

    Full Text Available Our research applies paradox theory to a project management construct to help project management researchers and practitioners understand the tensions that can exist between project success and client satisfaction. Our research highlights that although project success and client satisfaction are both present within a project management construct, they also belong to different functional systems. Project success and client satisfaction have different systemic-discourses and use different language games to convey information. These distinctions can create latent and sometimes salient tensions within the project management construct that project managers must understand, embrace, and work with. We have used a Grounded Theory (GT methodology to explore the lived experience of project managers, and from this have identified a phenomenon which we have termed project management yinyang. Project management yinyang is the state that exists when both project success and Client satisfaction are tightly coupled within the project management construct. Project management yinyang highlights that these two phenomena cannot be viewed as separate elements because the ‘seed’ of each exists within the other. And to truly achieve one, you must also achieve the other. Our findings indicate that in order to create project management yinyang the project manager must embrace a paradoxical yet holistic philosophy. They must understand the complementarity, interdependency, and structural coupling that exists between the positivist and interpretivist paradigms within the project management construct. They must understand how satisfaction (Yin and success (Yang are created through focus. Furthermore, they must understand how project management yinyang is separate from, but borne from, the convergence of the other two elements.

  12. Implementing Earned Value Management in the CxP EVA Systems Project Office

    Science.gov (United States)

    Sorge, Les L.

    2009-01-01

    Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

  13. Sample management implementation plan: Salt Repository Project

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of the Sample Management Implementation Plan is to define management controls and building requirements for handling materials collected during the site characterization of the Deaf Smith County, Texas, site. This work will be conducted for the US Department of Energy Salt Repository Project Office (SRPO). The plan provides for controls mandated by the US Nuclear Regulatory Commission and the US Environmental Protection Agency. Salt Repository Project (SRP) Sample Management will interface with program participants who request, collect, and test samples. SRP Sample Management will be responsible for the following: (1) preparing samples; (2) ensuring documentation control; (3) providing for uniform forms, labels, data formats, and transportation and storage requirements; and (4) identifying sample specifications to ensure sample quality. The SRP Sample Management Facility will be operated under a set of procedures that will impact numerous program participants. Requesters of samples will be responsible for definition of requirements in advance of collection. Sample requests for field activities will be approved by the SRPO, aided by an advisory group, the SRP Sample Allocation Committee. This document details the staffing, building, storage, and transportation requirements for establishing an SRP Sample Management Facility. Materials to be managed in the facility include rock core and rock discontinuities, soils, fluids, biota, air particulates, cultural artifacts, and crop and food stuffs. 39 refs., 3 figs., 11 tabs

  14. PROJECT MANAGER SKILLS, RISK MANAGEMENT TOOLS

    Directory of Open Access Journals (Sweden)

    Vladut Iacob

    2013-12-01

    Full Text Available Although the projects are different from each other there are many common things that contribute to their success. Looked overall, the success of a project is the result of a multitude of factors. This person is considered the "engine" of the project. The man who makes the action set for the achievement of project objectives to be brought to an end. The project manager must have the technical knowledge and economic diverse. He should be able to choose a team and lead. You must be tenacious, combative, to know how to communicate both within the team and beyond. In a word, the project manager must have an impressive stock of knowledge, skills and abilities and appreciate as Peter Drucker, to "exist for the organization. To be its servant. Any management who forget this will only cause damage to the organization. "This study will focus on highlighting the skills of the project manager and their role in managing difficult situations or risk.

  15. From project management to project leadership

    NARCIS (Netherlands)

    Braun, F.; Avital, M.

    2010-01-01

    It is virtually a truism that good leadership practices can help project managers with attaining the desired project outcome. However, a better understanding of which leadership practices enable project managers to be more effective warrants further investigation. Subsequently, in this study, we

  16. ECO INVESTMENT PROJECT MANAGEMENT THROUGH TIME APPLYING ARTIFICIAL NEURAL NETWORKS

    Directory of Open Access Journals (Sweden)

    Tamara Gvozdenović

    2007-06-01

    Full Text Available he concept of project management expresses an indispensable approach to investment projects. Time is often the most important factor in these projects. The artificial neural network is the paradigm of data processing, which is inspired by the one used by the biological brain, and it is used in numerous, different fields, among which is the project management. This research is oriented to application of artificial neural networks in managing time of investment project. The artificial neural networks are used to define the optimistic, the most probable and the pessimistic time in PERT method. The program package Matlab: Neural Network Toolbox is used in data simulation. The feed-forward back propagation network is chosen.

  17. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  18. Russia air management program

    Energy Technology Data Exchange (ETDEWEB)

    Pace, T.G. [U.S. Environmental Protection Agency, NC (United States); Markin, S. [Ministry of Environmental Protection and Natural Resources, Moscow (Sweden); Kosenkova, S.V. [Volgograd Environmental Services Administration, Volgograd (Russian Federation)

    1995-12-31

    The Russia Air Management Program is in the second year of a four-year cooperative program between the Russian Ministry of Environmental Protection and Natural Resources (MEPNR) and the U.S. Environmental Protection Agency (EPA) to improve national institutions, policies, and practices for air quality management in Russia. This program is part of the Environmental Policy and Technology project being conducted by the U.S. Agency for International Development. The Russia Air Management Program will pilot the application of potential air program improvements in the important industrial City of Volgograd which will enable the development, practical demonstration and evaluation of alternative approaches for improving AQM policies and practices in Russia. Volgograd has a progressive and environmentally enlightened local government, a diverse industrial base and a relatively healthy economy. It is located south of Moscow on the Volga River and was proposed by the Ministry of Environmental Protection and Natural Resources. It was selected after a site visit and a series of discussions with the Ministry, Volgograd officials, the World Bank and the EPA. Following the pilot, RAMP will work to facilitate implementation of selected parts of the pilot in other areas of Russia using training, technology transfer, and public awareness. (author)

  19. Russia air management program

    International Nuclear Information System (INIS)

    Pace, T.G.; Markin, S.; Kosenkova, S.V.

    1995-01-01

    The Russia Air Management Program is in the second year of a four-year cooperative program between the Russian Ministry of Environmental Protection and Natural Resources (MEPNR) and the U.S. Environmental Protection Agency (EPA) to improve national institutions, policies, and practices for air quality management in Russia. This program is part of the Environmental Policy and Technology project being conducted by the U.S. Agency for International Development. The Russia Air Management Program will pilot the application of potential air program improvements in the important industrial City of Volgograd which will enable the development, practical demonstration and evaluation of alternative approaches for improving AQM policies and practices in Russia. Volgograd has a progressive and environmentally enlightened local government, a diverse industrial base and a relatively healthy economy. It is located south of Moscow on the Volga River and was proposed by the Ministry of Environmental Protection and Natural Resources. It was selected after a site visit and a series of discussions with the Ministry, Volgograd officials, the World Bank and the EPA. Following the pilot, RAMP will work to facilitate implementation of selected parts of the pilot in other areas of Russia using training, technology transfer, and public awareness. (author)

  20. Russia air management program

    Energy Technology Data Exchange (ETDEWEB)

    Pace, T G [U.S. Environmental Protection Agency, NC (United States); Markin, S [Ministry of Environmental Protection and Natural Resources, Moscow (Sweden); Kosenkova, S V [Volgograd Environmental Services Administration, Volgograd (Russian Federation)

    1996-12-31

    The Russia Air Management Program is in the second year of a four-year cooperative program between the Russian Ministry of Environmental Protection and Natural Resources (MEPNR) and the U.S. Environmental Protection Agency (EPA) to improve national institutions, policies, and practices for air quality management in Russia. This program is part of the Environmental Policy and Technology project being conducted by the U.S. Agency for International Development. The Russia Air Management Program will pilot the application of potential air program improvements in the important industrial City of Volgograd which will enable the development, practical demonstration and evaluation of alternative approaches for improving AQM policies and practices in Russia. Volgograd has a progressive and environmentally enlightened local government, a diverse industrial base and a relatively healthy economy. It is located south of Moscow on the Volga River and was proposed by the Ministry of Environmental Protection and Natural Resources. It was selected after a site visit and a series of discussions with the Ministry, Volgograd officials, the World Bank and the EPA. Following the pilot, RAMP will work to facilitate implementation of selected parts of the pilot in other areas of Russia using training, technology transfer, and public awareness. (author)

  1. Web Project Management

    OpenAIRE

    Suralkar, Sunita; Joshi, Nilambari; Meshram, B B

    2013-01-01

    This paper describes about the need for Web project management, fundamentals of project management for web projects: what it is, why projects go wrong, and what's different about web projects. We also discuss Cost Estimation Techniques based on Size Metrics. Though Web project development is similar to traditional software development applications, the special characteristics of Web Application development requires adaption of many software engineering approaches or even development of comple...

  2. Project management case studies

    CERN Document Server

    Kerzner, Harold R

    2013-01-01

    A new edition of the most popular book of project management case studies, expanded to include more than 100 cases plus a ""super case"" on the Iridium Project Case studies are an important part of project management education and training. This Fourth Edition of Harold Kerzner''s Project Management Case Studies features a number of new cases covering value measurement in project management. Also included is the well-received ""super case,"" which covers all aspects of project management and may be used as a capstone for a course. This new edition:Contains 100-plus case studies drawn from re

  3. MRS project management

    International Nuclear Information System (INIS)

    Doman, J.W.; Vlahakis, J.

    1992-01-01

    Management of projects under the control of the Office of Civilian Radioactive Waste Management within the Department of Energy is subject to overview by a variety of internal and external entities. This paper reports that effective project management often requires balancing of conflicting directions and conflicting agendas of the different entities in order to proceed with implementation of the Monitored Retrievable Storage project

  4. The 2015-2016 SEPMAP Program at NASA JSC: Science, Engineering, and Program Management Training

    Science.gov (United States)

    Graham, L.; Archer, D.; Bakalyar, J.; Berger, E.; Blome, E.; Brown, R.; Cox, S.; Curiel, P.; Eid, R.; Eppler, D.; hide

    2017-01-01

    The Systems Engineering Project Management Advancement Program (SEPMAP) at NASA Johnson Space Center (JSC) is an employee development program designed to provide graduate level training in project management and systems engineering. The program includes an applied learning project with engineering and integrated science goals requirements. The teams were presented with a task: Collect a representative sample set from a field site using a hexacopter platform, as if performing a scientific reconnaissance to assess whether the site is of sufficient scientific interest to justify exploration by astronauts. Four teams worked through the eighteen-month course to design customized sampling payloads integrated with the hexacopter, and then operate the aircraft to meet sampling requirements of number (= 5) and mass (= 5g each). The "Mars Yard" at JSC was utilized for this purpose. This project activity closely parallels NASA plans for the future exploration of Mars, where remote sites will be reconnoitered ahead of crewed exploration.

  5. An IS Project Management Course Project

    Science.gov (United States)

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  6. Risk Management Program Application for the Component Test Capability

    International Nuclear Information System (INIS)

    Stephanie L. Austad; Jeffrey D. Bryan

    2009-01-01

    This paper documents the application of the risk management program requirements to Component Test Capability (CTC) Project activities for each CTC alternative. In particular, DOE O 413.3A, 'Program and Project Management for the Acquisition of Capital Assets,' and DOE G 413.3-7, 'Risk Management Guide for Project Management,' will apply in the event that Alternative 4, Single, Standalone Component Test Facility (CTF), is selected and approved. As such, it is advisable to begin planning to meet the associated Department of Energy (DOE) requirements and guidance as early in the acquisition process as practicable. This white paper is intended to assist in this planning and to support associated decision-making activities. Nontechnical risks associated with each alternative will be identified to support the Next Generation Nuclear Plant (NGNP) CTC alternatives analysis. Technical risks are assumed to be addressed through the Technology Development Risk Management modeling process and are inherent to the alternatives

  7. Project Management Approach to Transition of the Miamisburg Closure Project From Environmental Cleanup to Post-Closure Operations

    International Nuclear Information System (INIS)

    Carpenter, C.P.; Marks, M.L.; Smiley, S.L.; Gallaher, D.M.; Williams, K.D.

    2006-01-01

    The U.S. Department of Energy (DOE) used a project management approach to transition the Miamisburg Closure Project from cleanup by the Office of Environmental Management (EM) to post-closure operations by the Office of Legacy Management (LM). Two primary DOE orders were used to guide the site transition: DOE Order 430.1B, Real Property Asset Management, for assessment and disposition of real property assets and DOE Order 413.3, Program and Project Management for Acquisition of Capital Assets, for project closeout of environmental cleanup activities and project transition of post-closure activities. To effectively manage these multiple policy requirements, DOE chose to manage the Miamisburg Closure Project as a project under a cross-member transitional team using representatives from four principal organizations: DOE-LM, the LM contractor S.M. Stoller Corporation, DOE-EM, and the EM contractor CH2M Hill Mound Inc. The mission of LM is to manage the Department's post-transition responsibilities and long-term care of legacy liabilities and to ensure the future protection of human health and the environment for cleanup sites after the EM has completed its cleanup activities. (authors)

  8. IPEP: Laboratory performance evaluation reports for management of DOE EM programs

    International Nuclear Information System (INIS)

    Hensley, J.E.; Lindahl, P.C.; Streets, W.E.

    1995-01-01

    Environmental restoration program/project managers at DOE's Office of Environmental Management (EM) are making important decisions based on analytical data generated by contracted laboratories. The Analytical Services Division, EM-263, is developing the Integrated Performance Evaluation Program (IPEP) to assess the performance of those laboratories, based on results from Performance Evaluation (PE) programs. The IPEP reports will be used by the laboratories to foster self-assessment and improvement. In addition, IPEP will produce PE reports for three levels of EM management (Operations/Project Offices, Area Program Offices, and Deputy Assistant Secretary Office). These reports will be used to assess whether contracted analytical laboratories have the capability to produce environmental data of the quality necessary for making environmental restoration and waste management decisions

  9. PROJECT MANAGEMENT AND RELATIONSHIP MARKETING: INTERSECTIONS FOR STAKEHOLDER MANAGEMENT IN PROJECTS

    Directory of Open Access Journals (Sweden)

    Ronielton Rezende Oliveira

    2017-06-01

    Full Text Available Projects development is essential for organizations. Among the factors originated in projects that influence performance is quality. This variable must be managed to meet the expectations of the stakeholders and this can only be achieved through effective monitoring and control. It can be seen that relationship marketing is relevant to the competitive reality of contemporary organizations. With the purpose of contributing to organizational studies, this theoretical essay proposes to approach project management in relationship marketing. In the context of integrated management, it is discussed how management action can be applied to engage and involve stakeholders in projects, in order to create value and achieve the expectations sustained by the execution of the projects. Based on the reflection, the quality of relationship management is pointed out as a construct of higher order, composed of at least two dimensions: trust and satisfaction.

  10. Defining Projects to Integrate Evolving Team Fundamentals and Project Management Skills

    Science.gov (United States)

    Smith, Harold, III; Smarkusky, Debra; Corrigall, Elizabeth

    2008-01-01

    Industry has indicated the desire for academic programs to produce graduates that are well-versed in collaborative problem solving and general project management concepts in addition to technical skills. The primary focus of a curriculum is typically centered on the technical training with minimal attention given to coalescing team and project…

  11. Project management plan for the isotopes facilities deactivation project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-08-01

    Purpose of the deactivation project is to place former isotopes production facilities at ORNL in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance. This management plan was prepared to document project objectives, define organizational relationships and responsibilities, and outline the management control systems. The project has adopted the strategy of deactivating the simple facilities first. The plan provides a road map for the quality assurance program and identifies other documents supporting the Isotopes Facilities Deactivation Project

  12. Academy Sharing Knowledge (ASK). The NASA Source for Project Management Magazine, Volume 11, March 2003

    Science.gov (United States)

    2003-01-01

    APPL is a research-based organization that serves NASA program and project managers, as well as project teams, at every level of development. In 1997, APPL was created from an earlier program to underscore the importance that NASA places on project management and project teams through a wide variety of products and services, including knowledge sharing, classroom and online courses, career development guidance, performance support, university partnerships, and advanced technology tools. ASK Magazine grew out of APPL's Knowledge Sharing Initiative. The stories that appear in ASK are written by the 'best of the best' project managers, primarily from NASA, but also from other government agencies and industry. Contributors to this issue include: Teresa Bailey, a librarian at the Jet Propulsion Laboratory, Roy Malone, Deputy Director in the Safety and Mission Assurance (S&MA) Office at the NASA Marshall Space Flight Center (MSFC), W. Scott Cameron, Capital Systems Manager for the Food and Beverage Global Business Unit of Procter and Gamble, Ray Morgan, recent retiree as Vice President of AeroVironment, Inc., Marty Davis, Program Manager of the Geostationary Operational Environmental Satellite (GOES) at the NASA Goddard Space Flight Center (GSFC) in Greenbelt, Maryland, Todd Post, editor of ASK Magazine, and works for EduTech Ltd. in Silver Spring, Maryland, Dr. Owen Gadeken, professor of Engineering Management at the Defense Acquisition University, Ken Schwer, currently the Project Manager of Solar Dynamics Observatory, Dr. Edward Hoffmwan, Director of the NASA Academy of Program and Project Leadership, Frank Snow, a member of the NASA Explorer Program at Goddard Space Flight Center since 1992, Dr. Alexander Laufer, Editor-in-Chief of ASK Magazine and a member of the Advisory Board of the NASA Academy of Program and Project Leadership, Judy Stokley, presently Air Force Program Executive Officer for Weapons in Washington, D.C. and Terry Little, Director of the Kinetic

  13. Management of research and development project

    International Nuclear Information System (INIS)

    Go, Seok Hwa; Hong Jeong Yu; Hyun, Byeong Hwan

    2010-12-01

    This book introduces summary on management of research and development project, prepare of research and development with investigation and analysis of paper, patent and trend of technology, structure of project, management model, management of project, management of project range, management of project time, management of project cost, management of project goods, management of project manpower, management of communication, management of project risk, management of project supply, management of outcome of R and D, management of apply and enroll of patent and management of technology transfer.

  14. NPP Krsko Aging Management Program

    International Nuclear Information System (INIS)

    Glaser, B.; Spiler, J.

    2002-01-01

    As a part of Periodic Safety Review Program (PSR) NEK will review and perform some activities related to Equipment Qualification (EQ) and Aging Management Program (AMP). (EQ) and AMP are safety factors, which need to be assessed during PSR. The goal of PSR and AMP is to determine aging effects and give the conclusion whether the plant has been managed to control aging related degradations and that safety margins are maintained. The parallel goal is also to establish AMP for future plant operation and provide basis for possible Life Extension Program. NEK will develop NEK Aging and Life Cycle Management Program, similar by format and content to one determined by License Renewal program. The bases are in 10CFR54, and NEI 95-10 Industry Guidelines for 10 CFR 54 implementation. The process of establishment the AMP is to be done in two steps. The first step is dealing with SSC's (Systems Structures and Components) scoping and screening and identification of TLAA's (Time Limited Aging Analyses). That means, that a database of all SSC's and TLAA's will be created and then evaluated within AMP program. Based on the scope in first phase an evaluation will be performed in step two. NEK will maintain AMP program as a living program that may be also used for Life Extension and Life Cycle Management. This paper will present and describe AMP, scoping and screening process and the results achieved through the first phase of the project.(author)

  15. Study On The Multi-Project Management Practices for Complex Investments

    Directory of Open Access Journals (Sweden)

    Mircea Sandru

    2015-11-01

    Full Text Available This paper highlights the results of a study carried out during the doctoral research in case of multi project Engineering, Procurement, Construction, Commissioning (EPCC investment types. The objective of this study was to improve the project portfolio management. The methodology used in the research presented in this paper is focused on the analysis of the authors related to the approaches debated in literature and theirs applicability in EPCC type investment programs. In this sense were analyzed 11 international projects in petrochemical and refinery field and also 7 investments in other different areas of chemical industry. The research highlighted that the management process of these investments can be improved trough the correct project integration, being able to provide a performing working environment able to sustain the management team in identifying the investment program criticalities and congestion points in order to be able to manage them in an efficient manner in order to assure the reach of the investment goal. Having as consequence the possibility to significant reduction of execution period, up to 16% and in the mean time also the delays related risks through a more efficient investment managerial act.

  16. Managing clinical improvement projects.

    Science.gov (United States)

    Phillips, Joanna; Simmonds, Lorraine

    This paper, the second of a three-part series looking at change management tools, provides a practical guide on how to use common project management principles in practice. Much of the literature on project management focuses on the business arena, with little reference to clinical settings. Identifying this literature and understanding its relevance to managing projects in healthcare can be difficult. This article provides a practical guide to identifying the key principles of good project management and applying these in health settings.

  17. PC tools for project management: Programs and the state-of-the-practice

    Science.gov (United States)

    Bishop, Peter C.; Freedman, Glenn B.; Dede, Christopher J.; Lidwell, William; Learned, David

    1990-01-01

    The use of microcomputer tools for NASA project management; which features are the most useful; the impact of these tools on job performance and individual style; and the prospects for new features in project management tools and related tools are addressed. High, mid, and low end PM tools are examined. The pro's and con's of the tools are assessed relative to various tasks. The strengths and weaknesses of the tools are presented through cases and demonstrations.

  18. Multifamily Retrofit Project Manager Job/Task Analysis and Report: September 2013

    Energy Technology Data Exchange (ETDEWEB)

    Owens, C. M.

    2013-09-01

    The development of job/task analyses (JTAs) is one of three components of the Guidelines for Home Energy Professionals project and will allow industry to develop training resources, quality assurance protocols, accredited training programs, and professional certifications. The Multifamily Retrofit Project Manager JTA identifies and catalogs all of the tasks performed by multifamily retrofit project managers, as well as the knowledge, skills, and abilities (KSAs) needed to perform the identified tasks.

  19. COMPARATIVE RESEARCH ON PROJECT MANAGEMENT APPROACH IN THE EUROPEAN EDUCATIONAL INSTITUTIONS

    OpenAIRE

    Armenia ANDRONICEANU; Bianca RISTEA

    2015-01-01

    Nowadays, project management is common for many areas and industries, including the educational sector. The international cooperation between educational institutions and the students’ international mobility are built on major projects and programs established through European and national institutions. The aim of this article is to review the best practices of project management implementation in public secondary education. The analysis is focused on three European countries: France, Spain a...

  20. Managing Distributed Software Projects

    DEFF Research Database (Denmark)

    Persson, John Stouby

    Increasingly, software projects are becoming geographically distributed, with limited face-toface interaction between participants. These projects face particular challenges that need careful managerial attention. This PhD study reports on how we can understand and support the management...... of distributed software projects, based on a literature study and a case study. The main emphasis of the literature study was on how to support the management of distributed software projects, but also contributed to an understanding of these projects. The main emphasis of the case study was on how to understand...... the management of distributed software projects, but also contributed to supporting the management of these projects. The literature study integrates what we know about risks and risk-resolution techniques, into a framework for managing risks in distributed contexts. This framework was developed iteratively...

  1. Project Management: Essential Skill of Nurse Informaticists.

    Science.gov (United States)

    Sipes, Carolyn

    2016-01-01

    With the evolution of nursing informatics (NI), the list of skills has advanced from the original definition that included 21 competencies to 168 basic competencies identified in the TIGER-based Assessment of Nursing Informatics Competencies (TANIC) and 178 advanced skills in the Nursing Informatics Competency Assessment (NICA) L3/L4 developed by Chamberlain College of Nursing, Nursing Informatics Research Team (NIRT). Of these competencies, project management is one of the most important essentials identified since it impacts all areas of NI skills and provides an organizing framework for processes and projects including skills such as design, planning, implementation, follow-up and evaluation. Examples of job roles that specifically require project management skills as an essential part of the NI functions include management, administration, leadership, faculty, graduate level master's and doctorate practicum courses. But first, better understanding of the NI essential skills is vital before adequate education and training programs can be developed.

  2. Stripa Project - Summary of defined programs

    International Nuclear Information System (INIS)

    Carlsson, L.; Olsson, T.; Pusch, R.

    1980-11-01

    An international cooperation project, the Stripa Project, in the field of nuclear waste management has been established as an autonomous OECH/NEA project. The management of the project has been entrusted to the Divsion Nuclear Fuel Safety (KBS) of the Swedish Nuclear Fuel Supply Company (SKBF). Technical input and contribution of funds are given by the following countries: Canada, Finland, Japan, Sweden, Switzerland and the United States. The report summarizes the programs for investigations funded at this stage. A number of investigations of a geophysical, geochemical and hydraulic nature will be carried out in the boreholes and the drill cores will be mapped and analysed. Another experiment is with various tracers which represent all important types of radionuclides and will be introduced in the naturally flowing water in a single fissure in granite. The experiment will show how well sorption data from the laboratory can be used to predict radionuclide migration in the field with real surfaces and waters. The third project aims at the verification of the suitability of the buffer materials at real conditions on site. Highly compacted bentonite and mixtures of bentonite and quartz sand are proposed as buffer materials in final repositories for high-level radioactive wastes. (GB)

  3. Geothermal Reservoir Technology Research Program: Abstracts of selected research projects

    Energy Technology Data Exchange (ETDEWEB)

    Reed, M.J. (ed.)

    1993-03-01

    Research projects are described in the following areas: geothermal exploration, mapping reservoir properties and reservoir monitoring, and well testing, simulation, and predicting reservoir performance. The objectives, technical approach, and project status of each project are presented. The background, research results, and future plans for each project are discussed. The names, addresses, and telephone and telefax numbers are given for the DOE program manager and the principal investigators. (MHR)

  4. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  5. Management practices in substance abuse treatment programs.

    Science.gov (United States)

    McConnell, K John; Hoffman, Kim A; Quanbeck, Andrew; McCarty, Dennis

    2009-07-01

    Efforts to understand how to improve the delivery of substance abuse treatment have led to a recent call for studies on the "business of addiction treatment." This study adapts an innovative survey tool to collect baseline management practice data from 147 addiction treatment programs enrolled in the Network for the Improvement of Addiction Treatment 200 project. Measures of "good" management practice were strongly associated with days to treatment admission. Management practice scores were weakly associated with revenues per employee but were not correlated with operating margins. Better management practices were more prevalent among programs with a higher number of competitors in their catchment area.

  6. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD. INTEGRATED DISPOSAL FACILITY (IDF)

    International Nuclear Information System (INIS)

    MCLELLAN, G.W.

    2007-01-01

    permitting, scheduling, costs, stakeholders and technical issues. To meet the customer's needs and deadlines, the project was managed with conscientious discipline and application of sound project management principles in the Project Management Institute's Project Management Body of Knowledge. Several factors contributed to project success. Extensive planning and preparation were conducted, which was instrumental to contract and procurement management. Anticipating issues and risks, CH2M HILL prepared well defined scope and expectations, particularly for safety. To ensure worker safety, the project management team incorporated CH2M HILL's Integrated Safety Management System (ISMS) into the project and included safety requirements in contracting documents and baseline planning. The construction contractor DelHur Industries, Inc. adopted CH2M HILL's safety program to meet the procurement requirement for a comparable ISMS safety program. This project management approach contributed to an excellent safety record for a project with heavy equipment in constant motion and 63,555 man-hours worked. The project manager worked closely with ORP and Ecology to keep them involved in project decisions and head off any stakeholder or regulatory concerns. As issues emerged, the project manager addressed them expeditiously to maintain a rigorous schedule. Subcontractors and project contributors were held to contract commitments for performance of the work scope and requirements for quality, budget and schedule. Another element of project success extended to early and continual involvement of all interested in the project scope. Due to the public sensitivity of constructing a landfill planned for radioactive waste as well as offsite waste, there were many stakeholders and it was important to secure their agreement on scope and time frames. The project had multiple participants involved in quality assurance surveillances, audits and inspections, including the construction contractor, CH2M HILL

  7. Phased project planning and development in anticipation of operational programs

    Science.gov (United States)

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  8. The Stripa project in a Swedish waste management perspective

    International Nuclear Information System (INIS)

    Bjurstroem, S.

    1994-01-01

    This publication deals with the Swedish nuclear waste management program till the 60s; it also consists of a presentation of the Stripa Project, that played a important role in the research development work in Sweden. This project was carried out in collaboration with the United States, and an international participation was organized. The primary goals of this project were to develop scientific techniques to characterize a granite rock. The issues of such studies were of common concern to many countries that had research and development programs on the disposal of high-level radioactive wastes. (TEC)

  9. Ecological Forecasting Project Management with Examples

    Science.gov (United States)

    Skiles, J. W.; Schmidt, Cindy; Estes, Maury; Turner, Woody

    2017-01-01

    Once scientists publish results of their projects and studies, all too often they end up on the shelf and are not otherwise used. The NASA Earth Science Division established its Applied Sciences Program (ASP) to apply research findings to help solve and manage real-world problems and needs. ASP-funded projects generally produce decision support systems for operational applications which are expected to last beyond the end of the NASA funding. Because of NASAs unique perspective of looking down on the Earth from space, ASP studies involve the use of remotely sensed information consisting of satellite data and imagery as well as information from sub-orbital platforms. ASP regularly solicits Earth science proposals that address one or more focus areas; disasters mitigation, ecological forecasting, health and air quality, and water resources. Reporting requirements for ASP-funded projects are different from those typical for research grants from NASA and other granting agencies, requiring management approaches different from other programs. This presentation will address the foregoing in some detail and give examples of three ASP-funded ecological forecasting projects that include: 1) the detection and survey of chimpanzee habitat in Africa from space, 2) harmful algal blooms (HABs) in the California Current System affecting aquaculture facilities and marine mammal populations, and 3) a call for the public to identify North America wildlife in Wisconsin using trail camera photos. Contact information to propose to ASP solicitations for those PIs interested is also provided.

  10. How Project Managers Really Manage: An Indepth Look at Some Managers of Large, Complex NASA Projects

    Science.gov (United States)

    Mulenburg, Gerald M.; Impaeilla, Cliff (Technical Monitor)

    2000-01-01

    This paper reports on a research study by the author that examined ten contemporary National Aeronautics and Space Administration (NASA) complex projects. In-depth interviews with the project managers of these projects provided qualitative data about the inner workings of the project and the methodologies used in establishing and managing the projects. The inclusion of a variety of space, aeronautics, and ground based projects from several different NASA research centers helped to reduce potential bias in the findings toward any one type of project, or technical discipline. The findings address the participants and their individual approaches. The discussion includes possible implications for project managers of other large, complex, projects.

  11. A Place for Project Management in English Studies and Communication studies  curricula

    DEFF Research Database (Denmark)

    Kampf, Constance; Isohella, Suvi

    2009-01-01

    In this paper, we argue for a place for project management in the English Studies and Communication Studies curricula, often the home of Technical Communication programs, in order to offer students an opportunity to apply their language, discourse analysis, analytical skills, and creativity in a ...... of the project management genres are briefly discussed and related to key skills emerging from English studies and Technical Communication curricula.......In this paper, we argue for a place for project management in the English Studies and Communication Studies curricula, often the home of Technical Communication programs, in order to offer students an opportunity to apply their language, discourse analysis, analytical skills, and creativity...

  12. NHDOT : process for municipally-managed state bridge aid program projects

    Science.gov (United States)

    2007-09-12

    The document sets for the requirements for a municipality which to manage the design and construction of a bridge rehabilitation or replacement project and receive Bridge Aid under the applicable provisions of RSA 234. Bridge Aid provided to a Munici...

  13. Project Management Communication 2.0

    DEFF Research Database (Denmark)

    Berggreen, Line; Kampf, Constance Elizabeth

    2015-01-01

    How can we understand project management communication practices for developing effective practices in professional and technical communication? In this article we explore an approach to project management that focuses on projects as having a technical documentation structure with content...... that is developed through social or interpersonal communication practices. Looking at the broader picture of project management which besides the implementation phase also includes conception, planning and closure, we see a project management framework that brings together both technical and social aspects...... of project communication. To understand how this works, we interviewed project managers about their understanding and strategy in communicating about the projects they lead. Findings demonstrate that more experienced project managers have a more nuanced understanding of project communication as both...

  14. Design of training programs for a positive youth development program: Project P.A.T.H.S. in Hong Kong.

    Science.gov (United States)

    Shek, Daniel T L; Chak, Yammy L Y

    2010-01-01

    To facilitate the implementation of the Secondary 1 to Secondary 3 program of the Project P.A.T.H.S. in Hong Kong, systematic training programs are designed for the potential program implementers. The rationales, objectives and design of the Secondary 1 to Secondary 3 training programs are outlined in this paper. The training programs cover theories of adolescent development, positive youth development, background and curricula of the Project P.A.T.H.S., factors affecting program implementation quality and evaluation of the project. Besides introducing the curriculum units, the training programs also focus on nature of learning and related theories (particularly experiential learning), teaching methods and instructional techniques, motivating students, and classroom management.

  15. Earned value project management

    CERN Document Server

    Fleming, Quentin W

    2010-01-01

    Organizations that follow the principles of good Earned Value Management (EVM) create an environment that allows teams to successfully operate and thrive ? even in the face of challenges that could negatively impact their projects. Earned Value Project Management (EVPM) is a methodology used to measure and communicate the real physical progress of a project taking into account the work completed, the time taken and the costs incurred to complete that work. As a result, EVPM allows more educated and effective management decision-making, which helps evaluate and control project risk by measuring project progress in monetary terms. In the first two editions of Earned Value Project Management, Quentin W. Fleming and Joel M. Koppelman provided guidance for project management practitioners already familiar with EVPM, was well as those who were new to the use of this technique. The third edition expanded the information available on of EVPM for medium and smaller projects while still being relevant for larger projec...

  16. Project management process.

    Science.gov (United States)

    2007-03-01

    This course provides INDOT staff with foundational knowledge and skills in project management principles and methodologies. INDOTs project management processes provide the tools for interdisciplinary teams to efficiently and effectively deliver pr...

  17. Project officer's perspective: quality assurance as a management tool.

    Science.gov (United States)

    Heiby, J

    1993-06-01

    Advances in the management of health programs in less developed countries (LDC) have not kept pace with the progress of the technology used. The US Agency for International Development mandated the Quality Assurance Project (QAP) to provide quality improvement technical assistance to primary health care systems in LDCs while developing appropriate quality assurance (QA) strategies. The quality of health care in recent years in the US and Europe focused on the introduction of management techniques developed for industry into health systems. The experience of the QAP and its predecessor, the PRICOR Project, shows that quality improvement techniques facilitate measurement of quality of care. A recently developed WHO model for the management of the sick child provides scientifically based standards for actual care. Since 1988, outside investigators measuring how LDC clinicians perform have revealed serious deficiencies in quality compared with the program's own standards. This prompted developed of new QA management initiatives: 1) communicating standards clearly to the program staff; 2) actively monitoring actual performance corresponds to these standards; and 3) taking action to improve performance. QA means that managers are expected to monitor service delivery, undertake problem solving, and set specific targets for quality improvement. Quality improvement methods strengthen supervision as supervisors can objectively assess health worker performance. QA strengthens the management functions that support service delivery, e.g., training, records management, finance, logistics, and supervision. Attention to quality can contribute to improved health worker motivation and effective incentive programs by recognition for a job well done and opportunities for learning new skills. These standards can also address patient satisfaction. QA challenges managers to aim for the optimal level of care attainable.

  18. Managing Large Scale Project Analysis Teams through a Web Accessible Database

    Science.gov (United States)

    O'Neil, Daniel A.

    2008-01-01

    Large scale space programs analyze thousands of requirements while mitigating safety, performance, schedule, and cost risks. These efforts involve a variety of roles with interdependent use cases and goals. For example, study managers and facilitators identify ground-rules and assumptions for a collection of studies required for a program or project milestone. Task leaders derive product requirements from the ground rules and assumptions and describe activities to produce needed analytical products. Disciplined specialists produce the specified products and load results into a file management system. Organizational and project managers provide the personnel and funds to conduct the tasks. Each role has responsibilities to establish information linkages and provide status reports to management. Projects conduct design and analysis cycles to refine designs to meet the requirements and implement risk mitigation plans. At the program level, integrated design and analysis cycles studies are conducted to eliminate every 'to-be-determined' and develop plans to mitigate every risk. At the agency level, strategic studies analyze different approaches to exploration architectures and campaigns. This paper describes a web-accessible database developed by NASA to coordinate and manage tasks at three organizational levels. Other topics in this paper cover integration technologies and techniques for process modeling and enterprise architectures.

  19. A project management quality cost information system for the construction industry

    OpenAIRE

    Love, PED; Irani, Z

    2003-01-01

    A prototype Project Management Quality Cost System (PROMQACS) was developed to determine quality costs in construction projects. The structure and information requirements that are needed to provide a classification system of quality costs were identified and discussed. The developed system was tested and implemented in two case study construction projects to determine the information and management issues needed to develop PROMQACS into a software program. In addition, the system was used to...

  20. Optical projects in the Clinic program at Harvey Mudd College

    Science.gov (United States)

    Yang, Q.

    2017-08-01

    Clinic program is the senior capstone program at Harvey Mudd College (HMC). Multidisciplinary and industry-sponsored projects allow a team of students to solve a real-world problem over one academic year. Over its 50 plus years, Clinic program has completed numerous optics related projects. This report gives an overview of the Clinic program, reviews recent optical projects and discusses how this program supports the learning of the HMC engineering students. A few sample optical projects with more details are presented to provide an insight of what challenges that undergraduates can overcome. Students achieve learning within the optics discipline and the related engineering disciplines. The experiences in these optical projects indicate the great potential to bringing optical hands-on projects into the undergraduate level. Because of the general engineering curriculum at HMC, these projects often work the best with a multidisciplinary nature even if the core of the project is optically focused. Students gain leadership training, oral and written communication skills and experiences in team work. Close relationship with the sponsor liaisons allows for the students to gain skills in professional conduct, management of tight schedule and a specified budget, and it well prepares the students to their engineering practice. Optical projects have their own sets of specific challenges, so it needs to be chosen properly to match the undergraduate skill sets such as those of HMC engineering students.

  1. MANAGING LARGE INVESTMENT PROJECTS IN GORJ

    Directory of Open Access Journals (Sweden)

    CÎRNU DORU

    2016-12-01

    Full Text Available Currently, the concept of project management is considered to be the best concept for efficient management of a project, so it is used all over the world, and most recently in our country. This concept is designed with all the general characteristics of project management, but adapted to the large investment projects. This paper presents the project management concept and project management organization for capital projects. This concept is conceived with all general characteristics of project management, but adopted to the condition of large investment projects. The concept also includes the project team and the project manager, the person authorized and responsible for achieving the objectives planned in the project. For efficient managing by project, it is necessary to insure a good compozition of project team, as a team of people who, in collaboration with project manager, work directly on managing the project. To effectively manage the project, it is necessary to ensure a proper composition of the project team, a team of people who, in collaboration with the project manager to work directly for project management. It is a particularly good method of achieving the objectives planned projects, which means a project with a certain level of performance required in a planned time, with planned costs.

  2. Project Manager Performance and the Decision to Backsource the Project Management Office

    Science.gov (United States)

    Lively, William R.

    2014-01-01

    This paper reviews a management decision of an Information Technology Outsource (ITO) provider to backshore the management oversight of its Project Management Office (PMO) after only one year of offshore operations. Governance is a term used in project management to refer to management oversight. The review is a quantitative analysis of existing…

  3. Fundamentals of Project Management

    CERN Document Server

    Heagney, Joseph

    2011-01-01

    With sales of more than 160,000 copies, Fundamentals of Project Management has helped generations of project managers navigate the ins and outs of every aspect of this complex discipline. Using a simple step-by-step approach, the book is the perfect introduction to project management tools, techniques, and concepts. Readers will learn how to: ò Develop a mission statement, vision, goals, and objectives ò Plan the project ò Create the work breakdown structure ò Produce a workable schedule ò Understand earned value analysis ò Manage a project team ò Control and evaluate progress at every stage.

  4. An Environmental Management Maturity Model of Construction Programs Using the AHP-Entropy Approach

    Directory of Open Access Journals (Sweden)

    Libiao Bai

    2018-06-01

    Full Text Available The accelerating process of urbanization in China has led to considerable opportunities for the development of construction projects, however, environmental issues have become an important constraint on the implementation of these projects. To quantitatively describe the environmental management capabilities of such projects, this paper proposes a 2-dimensional Environmental Management Maturity Model of Construction Program (EMMMCP based on an analysis of existing projects, group management theory and a management maturity model. In this model, a synergetic process was included to compensate for the lack of consideration of synergies in previous studies, and it was involved in the construction of the first dimension, i.e., the environmental management index system. The second dimension, i.e., the maturity level of environment management, was then constructed by redefining the hierarchical characteristics of construction program (CP environmental management maturity. Additionally, a mathematical solution to this proposed model was derived via the Analytic Hierarchy Process (AHP-entropy approach. To verify the effectiveness and feasibility of this proposed model, a computational experiment was conducted, and the results show that this approach could not only measure the individual levels of different processes, but also achieve the most important objective of providing a reference for stakeholders when making decisions on the environmental management of construction program, which reflects this model is reasonable for evaluating the level of environmental management maturity in CP. To our knowledge, this paper is the first study to evaluate the environmental management maturity levels of CP, which would fill the gap between project program management and environmental management and provide a reference for relevant management personnel to enhance their environmental management capabilities.

  5. Project Management Techniques

    OpenAIRE

    Mihalache Anita; Salagean Liana

    2010-01-01

    Project management is a technique that can aid in the planning, scheduling, and monitoring of complex projects characterized by numerous, non repetitive jobs called activities. Examples of projects that would use project management include: - developing a mass rapid – transit system for a metropolitan area; - organizing the relocation of a corporate headquarters; - planning the production of a concert, film, or play; - developing and marketing a new automobile; - constructing a high – rise of...

  6. Cesium legacy safety project management work plan

    International Nuclear Information System (INIS)

    Durham, J.S.

    1998-01-01

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell)

  7. A cost benefit review of applying quality assurance principles to project management of environmental cleanup programs

    International Nuclear Information System (INIS)

    Oakes, T.W.

    1989-01-01

    This paper shows the cost/benefit mechanism used for applying the theory and practical aspects of QA principles as a management tool to project management of environmental cleanup projects. This includes reviewing and guidelines and requirements to determine the practical aspects of applying these requirements to environmental project management. Thus, there is a feedback loop for comparison of the cost/benefits of application of each stage of the project. The project's major stages include planning, environmental sampling, analysis of data samples, data/information management to include reporting, and follow- up, post-cleanup sampling with continued data management. A comparison is also made of the theory with the practical aspects of each of these stages

  8. Savannah River waste management program plan

    International Nuclear Information System (INIS)

    1980-04-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the waste management programs being undertaken by Savannah River contractors for the Fiscal Year 1980. In addition, the document projects activities for several years beyond 1980 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River, for developing technology to immobilize high-level radioactive wastes generated and stored at SR, and for developing technology for improved management of low-level solid wastes

  9. Needs assessment in health research projects: a new approach to project management in iran.

    Science.gov (United States)

    Peykari, Niloofar; Owlia, Parviz; Malekafzali, Hossein; Ghanei, Mostafa; Babamahmoodi, Abdolreza; Djalalinia, Shirin

    2013-01-01

    The science and technology health plan has defined the outline of health research to the national vision of Iran by 2025. The aim of this study was to focus on the process of needs assessment of health research projects also health research priority setting in Iran. THE PROJECT MANAGEMENT LIFE CYCLE HAS FOUR PHASES: Initiation, Planning, Execution and Closure. Based on abovementioned points we conducted the study. Focusing on the needs assessment led to systematic implementation of needs assessment of health project in all of the medical sciences universities. Parallel with this achieved strategies health research priority setting was followed through specific process from empowerment to implementation. We should adopt with more systematic progressive methods of health project managements for both our national convenience as well as our international health research programs.

  10. Managing the first nuclear power plant project

    International Nuclear Information System (INIS)

    2007-05-01

    would be of benefit to the countries, utilities and other organizations involved in such endeavors. The IAEA has collated worldwide experience and developed guidance in all aspects of managing nuclear power plant projects. This guidance was published in a number of technical documents issued during the last two decades. The present publication is aimed to select some relevant elements that provide a general overview of the main activities in managing the first nuclear power project and lists those specific publications where the reader can obtain further detailed information. Target audience is the decision makers, advisers and senior managers in the governmental organizations, utilities, industrial organizations and regulatory bodies in the countries desiring to launch the first nuclear power project This publication was produced within IAEA program directed to increase the capability of Member States to plan and implement nuclear power programs and to establish and enhance national nuclear infrastructure

  11. The Impact of Project Management Maturity upon IT/IS Project Management Outcomes

    Science.gov (United States)

    Carcillo, Anthony Joseph, Jr.

    2013-01-01

    Although it is assumed that increasing the institutionalization (or maturity) of project management in an organization leads to greater project success, the literature has diverse views. The purpose of this mixed methods study was to examine the correlation between project management maturity and IT/IS project outcomes. The sample consisted of two…

  12. The Environmental Management Project Manager's Handbook for improved project definition

    International Nuclear Information System (INIS)

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook

  13. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    Science.gov (United States)

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  14. Project management in health informatics.

    Science.gov (United States)

    Ho, Jessica

    2010-01-01

    This chapter gives an educational overview of: * the concept of project management and its role in modern management * the generic project lifecycle process * processes used in developing a plan for the management of resources - time, cost, physical resources and people * the concept of managing risk in projects * communication processes and practices that are important to the management of projects.

  15. Project management for engineers

    CERN Document Server

    Bennett, Michael J

    2014-01-01

    Project Management for Engineers, as the title suggests, is a direct attempt at addressing the ever-increasing and specific needs for better project management of engineering students, practicing engineers and managers in the industry. It aims not only to present the principles and techniques of Project Management, but also to discuss project management standards, processes and requirements, such as PMBOK, IEEE and PRINCE. Each chapter begins with the basics of the theme being developed at a level understandable to an undergraduate, before more complex topics are introduced at the end of each section that are suitable for graduate students. For the practicing professionals or managers in the industry, the book also provides many real illustrations of practical application of the principles of Project Management. Through a realistic blend of theory and practical examples, as well as an integration of the engineering technical issues with business issues, this book seeks to remove the veil of mystery that has...

  16. User's operating procedures. Volume 1: Scout project information programs

    Science.gov (United States)

    Harris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the Scout Project Automatic Data System, called SPADS is given. SPADS is the result of the past seven years of software development on a Prime minicomputer located at the Scout Project Office. SPADS was developed as a single entry, multiple cross reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. The instructions to operate the Scout Project Information programs in data retrieval and file maintenance via the user friendly menu drivers is presented.

  17. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    International Nuclear Information System (INIS)

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level

  18. CONTEMPORARY TRENDS IN PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Ana Argirova

    2015-09-01

    Full Text Available The modern information society in ever increasing business projects and time limits to achieve the objectives at minimum cost leads to a search for ways to manage them. Today, more and more managers use IT tools for project management, and the term itself is associated with software solutions for the optimization and management of projects in different fields of human activity. The paper examines the main characteristics of project management by means of information technology. Key tasks and processes in the project implementation and management are discussed.

  19. SDDOT transportation systems management & operations program plan.

    Science.gov (United States)

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  20. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD INTEGRATED DISPOSAL FACILITY (IDF)

    Energy Technology Data Exchange (ETDEWEB)

    MCLELLAN, G.W.

    2007-02-07

    issues as well as challenges with permitting, scheduling, costs, stakeholders and technical issues. To meet the customer's needs and deadlines, the project was managed with conscientious discipline and application of sound project management principles in the Project Management Institute's Project Management Body of Knowledge. Several factors contributed to project success. Extensive planning and preparation were conducted, which was instrumental to contract and procurement management. Anticipating issues and risks, CH2M HILL prepared well defined scope and expectations, particularly for safety. To ensure worker safety, the project management team incorporated CH2M HILL's Integrated Safety Management System (ISMS) into the project and included safety requirements in contracting documents and baseline planning. The construction contractor DelHur Industries, Inc. adopted CH2M HILL's safety program to meet the procurement requirement for a comparable ISMS safety program. This project management approach contributed to an excellent safety record for a project with heavy equipment in constant motion and 63,555 man-hours worked. The project manager worked closely with ORP and Ecology to keep them involved in project decisions and head off any stakeholder or regulatory concerns. As issues emerged, the project manager addressed them expeditiously to maintain a rigorous schedule. Subcontractors and project contributors were held to contract commitments for performance of the work scope and requirements for quality, budget and schedule. Another element of project success extended to early and continual involvement of all interested in the project scope. Due to the public sensitivity of constructing a landfill planned for radioactive waste as well as offsite waste, there were many stakeholders and it was important to secure their agreement on scope and time frames. The project had multiple participants involved in quality assurance surveillances, audits and

  1. Project Management Support and Services for the Environmental Restoration and Waste Management. Final report

    International Nuclear Information System (INIS)

    1995-01-01

    The Los Alamos National Laboratory (LANL) Environmental Restoration Technical Support Office (ERTSO) contracted Project Time ampersand Cost, Inc. (PT ampersand C) on 16 November 1992 to provide support services to the US Department of Energy (DOE). ERTSO had traditionally supported the DOE Albuquerque office in the Environmental Restoration and Waste Management Programs and had also supported the Office of Waste Management (EM-30) at DOE Headquarters in Germantown, Maryland. PT ampersand C was requested to provide project management and support services for the DOE as well as liaison and coordination of responses and efforts between various agencies. The primary objective of this work was to continue LANL's technical support role to EM-30 and assist in the development of the COE Cost and Schedule Estimating (CASE) Guide for EM-30. PT ampersand C's objectives, as specified in Section B of the contract, were well met during the duration of the project through the review and comment of various draft documents, trips to DOE sites providing program management support and participating in the training for the EM-30 Cost and Schedule Estimating Guide, drafting memos and scheduling future projects, attending numerous meetings with LANL, DOE and other subcontractors, and providing written observations and recommendations.he results obtained were determined to be satisfactory by both the LANL ERTSO and DOE EM-30 organizations. The objective to further the support from LANL and their associated subcontractor (PT ampersand C) was met. The contract concluded with no outstanding issues

  2. Project management plan for exploratory shaft at Yucca Mountain

    International Nuclear Information System (INIS)

    1983-08-01

    This Project Management Plan (PMP) provides the basic guidance and describes the organizational structure and procedures for the design, construction, and testing of a large-diameter Exploratory Shaft (ES) in tuffaceous media as a major element within the Nevada Nuclear Waste Storage Investigations (NNWSI) project, which is a part of the National Waste Terminal Storage (NWTS) Program, US Department of Energy (DOE). The PMP encompasses activities identified as construction phase and in situ phase testing to be conducted from the ES through September 30, 1986. Specific topics addressed are the ES project objectives, the management organization and responsibilities, functional support requirements, work plan (including quality assurance aspects), work breakdown structure, milestone schedule, logic diagram, performance criteria, cost estimates, management control systems, procurement plan, test plan, and environmental, health and safety plans

  3. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  4. PROJECT - RESOURCE MANAGEMENT OF INNOVATIONS IN EDUCATION: ANTHROPOLOGICAL PROJECTION

    Directory of Open Access Journals (Sweden)

    Galina Aleksandrovna Ignat’eva

    2015-08-01

    Full Text Available The purpose of the research was to denote a way to solve the problem of education mana-gement ΄s insufficient efficiency considered from the point of view of education opportunities to influence on the formation of mechanisms for sustainable development of society as a whole and its educational component. The concept «project-resource management of innovation in education» regarded on the basis of the anthropological project-transforming paradigm. Conceptually-categorical context presented by conceptual cluster composed of coordinated concepts «project», «resource», «educational reality», «organizational-resource potential», «project commonality». In the theoretical part of the study on the basis of analysis of the normative and exploratory approaches to educational innovations organization and management it was established the search approach ΄s leading role in the methodological substantiation of project-resource management. The study have indicated that in the presence of variable models of innovation management in education, corresponding to various predictive models of continuing education post-industrial society, project-resource management is an universal mechanism for the transition from separate innovation΄s precedents to the an authentic reality of innovative education. In the technological part of the study the main concern was to submit the project-resource management by the management goal’s system, each of which includes the specific management actions, projected results and the organizational forms. The project-resource management ΄s professional – activity context of the study showed evolution of managerial positions: an effective performer – an effective leader – strategist, implemented during the transition from directly directive management to the project management and further to the project-resource management. Based on the findings identified the key factors of initiatively-problem projects

  5. Agile Project Management For Dummies

    CERN Document Server

    Layton, Mark C

    2012-01-01

    Be flexible and faster with Agile project management As mobile and web technologies continue to evolve rapidly, there is added pressure to develop and implement software projects in weeks instead of months. Agile Project Management For Dummies can make that happen. This is the first book to provide a simple, step-by-step guide to Agile Project Management approaches, tools, and techniques. With the fast pace of mobile and web technology development, software project development must keep pace; Agile Project Management enables developers to complete and implement projects more quickly and this b

  6. The relation between project management education and newer streams in project management research

    DEFF Research Database (Denmark)

    Leimbach, Timo; Goodall, Julie Bladt

    2017-01-01

    In the last decades, research in project management (PM) has experienced significant new inputs from a range of new PM methodologies and critical research streams. As a consequence, members of the more critical streams have called for the education of project managers to advance from that of trai......In the last decades, research in project management (PM) has experienced significant new inputs from a range of new PM methodologies and critical research streams. As a consequence, members of the more critical streams have called for the education of project managers to advance from...... that of training technicians, to fostering reflective practitioners that are better equipped to handle the increasing complexity of the profession. This paper is based on a recently commenced re-search project titled "Rethinking Project Management Education – the Role of Universities" that is aimed at analysing...... how the development of PM research is reflected in the education of project managers. On the basis of a short overview of the state of the art of PM education research and practices, the possible challenges for the development of PM education are discussed, and, finding that there is a lack...

  7. Leadership and management influences the outcome of wildlife reintroduction programs: findings from the Sea Eagle Recovery Project.

    Science.gov (United States)

    Sutton, Alexandra E

    2015-01-01

    Wildlife reintroductions and translocations are statistically unlikely to succeed. Nevertheless, they remain a critical part of conservation because they are the only way to actively restore a species into a habitat from which it has been extirpated. Past efforts to improve these practices have attributed the low success rate to failures in the biological knowledge (e.g., ignorance of social behavior, poor release site selection), or to the inherent challenges of reinstating a species into an area where threats have already driven it to local extinction. Such research presumes that the only way to improve reintroduction outcomes is through improved biological knowledge. This emphasis on biological solutions may have caused researchers to overlook the potential influence of other factors on reintroduction outcomes. I employed a grounded theory approach to study the leadership and management of a successful reintroduction program (the Sea Eagle Recovery Project in Scotland, UK) and identify four critical managerial elements that I theorize may have contributed to the successful outcome of this 50-year reintroduction. These elements are: 1. Leadership & Management: Small, dedicated team of accessible experts who provide strong political and scientific advocacy ("champions") for the project. 2. Hierarchy & Autonomy: Hierarchical management structure that nevertheless permits high individual autonomy. 3. Goals & Evaluation: Formalized goal-setting and regular, critical evaluation of the project's progress toward those goals. 4. Adaptive Public Relations: Adaptive outreach campaigns that are open, transparent, inclusive (esp. linguistically), and culturally relevant.

  8. Project Management

    DEFF Research Database (Denmark)

    Kampf, Constance

    2009-01-01

    In this video Associate Professor Constance Kampf talks about the importance project management. Not only as a tool in implementation, but also as a way of thinking, and as something that needs to be considered from idea conception......In this video Associate Professor Constance Kampf talks about the importance project management. Not only as a tool in implementation, but also as a way of thinking, and as something that needs to be considered from idea conception...

  9. Marketing the Masters of Executive Management program

    OpenAIRE

    Barrera, Mark A.; Karriker, Timothy W.

    2007-01-01

    MBA Professional Report The purpose of this MBA project was to review the current Masters of Executive Management education curriculum at NPS. An internal analysis of the current program was conducted to fully understand the strategic goals of the program and the existing curriculum. An environmental scan of current and potential military customers was conducted to assess requirements for junior executive education and determine whether the MEM program corresponds with these requiremen...

  10. Systems engineering management plan for the Salt Repository Project

    International Nuclear Information System (INIS)

    Neff, J.O.

    1986-08-01

    This document presents the plan for using systems engineering in conducting and managing the technical work of the Salt Repository Project (SRP) of the US Department of Energy's Civilian Radioactive Waste Management Program. The need for preparing a Systems Engineering Management Plan (SEMP) is traced back to relevant DOE directives. These directives are interpreted as SRP requirements in the context of the Mined Geologic Disposal System. The strategy for conducting systems engineering on the SRP, including the role of the systems engineering process, is then described. The SEMP also designates who in the project organization will be responsible for carrying out the activities. Finally, the management tools that are used to implement the systems engineering process, including associated documentation on the SRP, are described

  11. Rethinking Project Management in Denmark

    DEFF Research Database (Denmark)

    Svejvig, Per

    2012-01-01

    . The chapter argues for a rethinking process due to pervasiveness and complexity in the contemporary project environment where rethinking is needed in order to stay competitive. The suggested approach for the rethinking project management is a framing process where body of ideas is established......Projects are everywhere across different sectors, industries and countries. Project management is no longer a sub-discipline of engineering and other rather technical disciplines but is also used for many other purposes. Even though practice has changed dramatically over the years, the models...... and methodologies for project management has been fairly static and has therefore received substantial criticism for a lack of relevance to practice. Several scholars have therefore started to think more widely about projects and project management conceptualized as rethinking project management. However this theme...

  12. Project Management Methodology in Human Resource Management

    Science.gov (United States)

    Josler, Cheryl; Burger, James

    2005-01-01

    When charged with overseeing a project, how can one ensure that the project will be completed on time, within budget, and to the satisfaction of everyone involved? In this article, the authors examine project management methodology as a means of ensuring that projects are conducted in a disciplined, well-managed and consistent manner that serves…

  13. Web Based Project Management System

    OpenAIRE

    Aadamsoo, Anne-Mai

    2010-01-01

    To increase an efficiency of a product, nowadays many web development companies are using different project management systems. A company may run a number of projects at a time, and requires input from a number of individuals, or teams for a multi level development plan, whereby a good project management system is needed. Project management systems represent a rapidly growing technology in IT industry. As the number of users, who utilize project management applications continues to grow, w...

  14. Progress and problems in the Formerly Utilized Sites Remedial Action Program and Surplus Facilities Management Program

    International Nuclear Information System (INIS)

    Fiore, J.J.; Turi, G.P.

    1988-01-01

    The Formerly Utilized Sites Remedial Action Program (FUSRAP) was established in 1974 to identify, evaluate, and as appropriate, conduct remedial actions at sites used in the early years of nuclear energy development by the Manhattan Engineer District and the Atomic Energy Commission (AEC). This program currently has 29 sites and is evaluating 350 other sites for possible inclusion in the program. Another remedial action program in the Department of Energy's (DOE) Division of Facility and Site Decommissioning Projects is the Surplus Facilities Management Program (SFMP). The SFMP involves the safe management, decontamination and disposal of surplus DOE contaminated facilities which were not related to defense activities. There are currently 33 projects at 15 different sites in the program. These two programs have made steady progress over the last 10 or so years in cleaning up sites so that they can be reused or released for unrestricted use. Work has been completed at 8 of the FUSRAP sites and three of the SFMP sites

  15. Monitoring Completed Navigation Projects Program

    National Research Council Canada - National Science Library

    Bottin, Jr., Robert R

    2001-01-01

    ... (MCNP) Program. The program was formerly known as the Monitoring Completed Coastal Projects Program, but was modified in the late 1990s to include all navigation projects, inland as well as coastal...

  16. Assurance program for remedial action (APRA) microcomputer-operated bibliography management system

    International Nuclear Information System (INIS)

    Stenner, R.D.; Washburn, D.K.; Denham, D.H.

    1985-10-01

    Pacific Northwest Laboratory (PNL) provided technical assistance to the Office of Operational Safety (OOS) in developing their Assurance Program for Remedial Action (APRA). The APRA Bibliography Management System (BMS), a microcomputer-operated system designed to file, locate and retrieve project-specific bibliographic data, was developed to manage the documentation associated with APRA. The BMS uses APRABASE, a PNL-developed computer program written in dBASE II language, which is designed to operate using the commercially available dBASE II database software. The paper describes the APRABASE computer program, its associated subprograms, and the dBASE II APRA file. Although the BMS was designed to manage APRA-associated documents, it could be easily adapted for use in handling bibliographic data associated with any project

  17. Assurance Program for Remedial Action (APRA) microcomputer-operated bibliography management system

    International Nuclear Information System (INIS)

    Stenner, R.D.; Washburn, D.K.; Denham, D.H.

    1986-01-01

    Pacific Northwest Laboratory (PNL) provided technical assistance to the Office of Operational Safety (OOS) in developing their Assurance Program for Remedial Action (APRA). The APRA Bibliography Management System (BMS), a microcomputer-operated system designed to file, locate and retrieve project-specific bibliographic data, was developed to manage the documentation associated with APRA. The BMS uses APRABASE, a PNL-developed computer program written in dBASE II/sup (b)/ language, which is designed to operate using the commercially available dBASE II database software. This paper describes the APRABASE computer program, its associated subprograms, and the dBASE II APRA file. Although the BMS was designed to manage APRA-associated documents, it could be easily adapted for use in handling bibliographic data associated with any project

  18. Project report - an overview of the project and experiences with project management

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Mikkelsen, Bent Egberg

    1996-01-01

    A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project.......A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project....

  19. Efficient and Effective Project Management

    Directory of Open Access Journals (Sweden)

    Dusan Pene

    2014-03-01

    Full Text Available The purpose of the article is to investigate different authorities and responsibilities of a project manager and of a project leader. Considering the fact that nowadays the project management is becoming the important factor in performing and leading the investments which are modified by modern leadership theories, we can say that the key element is the sovereign leadership of a manager and a project leader. The current multi-project environments and modern techniques at the project management area need the interdisciplinary leadership approach and at the same time they enable the strengthening of company’s competitive features so they are consistently satisfying high project expectations of the project investor or a client.

  20. Project Management Plan/Progress Report UT/GTKS Training Program Development for Commercial Building Operators

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2013-03-31

    standards established by UT and will complete the contact hours required of training to apply to the Certification on Energy Management (CEM) offered by the Association of Energy Engineers (AEE). The CBO training program consists of a combination of theory (classroom), online & computer simulation, laboratory & hands on (onsite) training lessons. The training is addressed four basic learning elements: (1) Learn the Technology; (2) Practice Skills with hands-on the Energy Simulation Builder program; (3) Final Project and Presentation; and, (4) Accreditation and Certifications.

  1. Managing projects a team-based approach

    CERN Document Server

    Brown, Karen A

    2010-01-01

    Students today are likely to be assigned to project teams or to be project managers almost immediately in their first job. Managing Projects: A Team-Based Approach was written for a wide range of stakeholders, including project managers, project team members, support personnel, functional mangers who provide resources for projects, project customers (and customer representatives), project sponsors, project subcontractors, and anyone who plays a role in the project delivery process. The need for project management is on the rise as product life cycles compress, demand for IT systems increases, and business takes on an increasingly global character. This book adds to the project management knowledge base in a way that fills an unmet need—it shows how teams can apply many of the standard project management tools, as well as several tools that are relatively new to the field. Managing Projects: A Team-Based Approach offers the academic rigor found in most textbooks along with the practical attributes often foun...

  2. Regulatory research and support program for 1993/1994 - project descriptions

    International Nuclear Information System (INIS)

    1993-01-01

    The Regulatory Research and Support Program (RSP) is intended to augment and extend the Atomic Energy Control Board's regulatory program beyond the capability of in-house resources. The overall objective of the research and support program is to produce pertinent and independent information that will assist the Board and its staff in making sound, timely and credible decisions on regulating nuclear facilities and materials. The program is divided into nine main areas of research (mission objects) covering the safety of nuclear facilities, radioactive waste management, health physics, physical security, the development of regulatory processes, and special services. In addition, for the first time in this year's program, sub-programs (collections of related projects) have been organized in some areas of study; these sub-programs may cut across several mission objects. More sub-programs will be introduced in future years. A total of 96 projects are planned for 1993/94, including a number which are ongoing from the previous fiscal year. Projects that are held in reserve in case funding becomes available are also listed and provisionally ranked. The spending estimates for the RSP were calculated on the basis of an expected budget of $3.85 M

  3. Regulatory research and support program for 1993/1994 - project descriptions

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-03-01

    The Regulatory Research and Support Program (RSP) is intended to augment and extend the Atomic Energy Control Board`s regulatory program beyond the capability of in-house resources. The overall objective of the research and support program is to produce pertinent and independent information that will assist the Board and its staff in making sound, timely and credible decisions on regulating nuclear facilities and materials. The program is divided into nine main areas of research (mission objects) covering the safety of nuclear facilities, radioactive waste management, health physics, physical security, the development of regulatory processes, and special services. In addition, for the first time in this year`s program, sub-programs (collections of related projects) have been organized in some areas of study; these sub-programs may cut across several mission objects. More sub-programs will be introduced in future years. A total of 96 projects are planned for 1993/94, including a number which are ongoing from the previous fiscal year. Projects that are held in reserve in case funding becomes available are also listed and provisionally ranked. The spending estimates for the RSP were calculated on the basis of an expected budget of $3.85 M.

  4. Core Activities Program. TMI-2 Core Receipt and Storage Project Plan

    International Nuclear Information System (INIS)

    Ayers, A.L. Jr.

    1984-12-01

    The TMI-2 Core Receipt and Storage Project is funded by the US Department of Energy and managed by the Technical Support Branch of EG and G Idaho, Inc. at the Idaho National Engineering Laboratory (INEL). As part of the Core Activities Program, this project will include: (a) preparations for receipt and storage of the Three Mile Island Unit 2 core debris at INEL; and (b) receipt and storage operations. This document outlines procedures; project management; safety, environment, and quality; safeguards and security; deliverables; and cost and schedule for the receipt and storage activities at INEL

  5. Multidisplinary Engineering, Project, and Production Management

    OpenAIRE

    Chien-Ho Ko

    2012-01-01

    Journal of Engineering, Project, and Production Management (EPPM-Journal) reflect the journal’s multidisciplinary approach to management research and can be categorized as belonging to three general topics: Project Management, Engineering and Project Management, and Project and Production Management.

  6. Evolution of project management research: a bibliometric study of International Journal of Project Management

    Directory of Open Access Journals (Sweden)

    Fábio Cocchi da Silva Eiras

    2017-03-01

    Full Text Available Over the past decades, the project management field has evolved and consolidated. Facing this growth, this research aims to identify the main trends of research in the area, as well as providing an overview of publications, identifying new issues, changes in approaches and the development of knowledge areas. To do so, a systematic review of the literature was performed with the use of bibliometric study in the papers of the International Journal of Project Management (IJPM, included in SCOPUS, from its first volume to 2015, covering a period of more than 30 years. It was found that developing countries are increasingly concerned in developing research into the field of project management, especially in mega infrastructure projects and public-private partnerships. The risk is a central topic in all periods of analysis, however, the strategic topics such as success in project and portfolio management are among the fastest growing. Issues related to the soft side of project management as skills, culture, and knowledge management have emerged in recent periods. According to the industry, construction projects and projects in information technology are the most studied along the period analysed.

  7. Training Project Management Complexity in Postgraduate And Continuing Education Programs: A Learning Strategy in The Eshe (European Space of Higher Education) Framework

    OpenAIRE

    Mtnez-Almela, Jesús; de los Rios, Ignacio

    2011-01-01

    The objective of this paper is to address the methodological process of a teaching strategy for training project managment complexity in postgraduate programs. The proposal is made up of different methods —intuitive, comparative, deductive, case study, problem-solving Project-Based Learning— and different activities inside and outside the classroom. This integration of methods motivated the current use of the concept of “learning strategy”. The strategy has two phases: firstly, the integra...

  8. Quality assurance program plan for 324 Building B-Cell safety cleanout project (BCCP)

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the 324 Building B-Cell Safety Cleanout Project (BCCP). This QAPP is responsive to the Westinghouse Hanford Company Quality Assurance Program and Implementation Plan, WHC-SP-1131, for 10 CFR 830.120, Nuclear Safety Management, Quality Assurance Requirements; and DOE Order 5700.6C, Quality Assurance. This QAPP supersedes PNNL PNL-MA-70 QAP Quality Assurance Plan No. WTC-050 Rev. 2, issue date May 3, 1996. This QAPP has been developed specifically for the BCCP. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP). These activities include all aspects of decontaminating B-Cell and project related operations within the 324 Building as it relates to the specific activities of this project. General facility activities (i.e. 324 Building Operations) are covered in the Building 324 QAPP. In addition, this QAPP supports the related quality assurance activities addressed in CM-2-14, Hazardous Material Packaging and Shipping, and HSRCM-1, Hanford Site Radiological Control Manual, The 324 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a B and W Hanford Company (BWHC) managed facility. During this transition process existing, PNNL procedures and documents will be utilized until replaced by BWHC procedures and documents. These documents conform to the requirements found in PNL-MA-70, Quality Assurance Manual and PNL-MA-8 1, Hazardous Materials Shipping Manual. The Quality Assurance Program Index (QAPI) contained in Table 1 provides a matrix which shows how project activities relate to 10 CFR 83 0.120 and 5700.6C criteria. Quality Assurance program requirements will be addressed separate from the requirements specified in this document. Other Hanford Site organizations/companies may be

  9. Conceptualizing Knowledge Communication for Project Management

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    2015-01-01

    In the field of project management, the search for better ways to manage projects is ongoing. One of the more recent trends in the literature focuses on the integration of knowledge management in project management environments. Advantages of integrating knowledge management into projects can be ...... knowledge for project management, this paper focuses on extending Knowledge Management to include concepts related to communicating knowledge from the fields of rhetoric, knowledge communication, and corporate communication....

  10. From risk management to uncertainty management: a significant change in project management

    Institute of Scientific and Technical Information of China (English)

    LI Gui-jun; ZHANG Yue-song

    2006-01-01

    Starting with the meanings of the terms "risk" and "uncertainty,"" he paper compares uncertainty management with risk management in project management. We bring some doubt to the use of "risk" and "uncertainty" interchangeably in project management and deem their scope, methods, responses, monitoring and controlling should be different too. Illustrations are given covering terminology, description, and treatment from different perspectives of uncertainty management and risk management. Furthermore, the paper retains that project risk management (PRM) processes might be modified to facilitate an uncertainty management perspective,and we support that project uncertainty management (PUM) can enlarge its contribution to improving project management performance, which will result in a significant change in emphasis compared with most risk management.

  11. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  12. Multidisplinary Engineering, Project, and Production Management

    Directory of Open Access Journals (Sweden)

    Chien-Ho Ko

    2012-01-01

    Full Text Available Journal of Engineering, Project, and Production Management (EPPM-Journal reflect the journal’s multidisciplinary approach to management research and can be categorized as belonging to three general topics: Project Management, Engineering and Project Management, and Project and Production Management.

  13. From Project Management to Process Management - Effectively Organising Transdisciplinary Projects

    OpenAIRE

    Moschitz, Heidrun

    2013-01-01

    In transdisciplinary projects, the roles of researchers change. In addition to being a source of knowledge, they are required to engage in knowledge exchange processes. This results in an alteration at project level: researchers need to creatively manage projects as group processes.

  14. User's operating procedures. Volume 3: Projects directorate information programs

    Science.gov (United States)

    Haris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the scout project automatic data system, called SPADS is presented. SPADS is the results of the past seven years of software development on a prime mini-computer. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, three of three, provides the instructions to operate the projects directorate information programs in data retrieval and file maintenance via the user friendly menu drivers.

  15. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE`s Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES&H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report.

  16. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    International Nuclear Information System (INIS)

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE's Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES ampersand H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report

  17. Final report on Paradox Basin/Gulf Interior: Regulatory project management

    International Nuclear Information System (INIS)

    1986-12-01

    This final report on the Regulatory Project Manager (RPM) program begins with a discussion of the key products produced during the 9-year effort and then focuses on the work performed in the major disciplines. The report then discusses the management of the work effort and the Quality Assurance (QA) program. It concludes with a brief discussion of the records turned over to the Office of Nuclear Waste Isolation (ONWI) at the conclusion of the work. 14 figs., 14 tabs

  18. Staff training program of CANDU projects in Saskatoon

    International Nuclear Information System (INIS)

    Huterer, J.

    1996-01-01

    This paper describes the training process for a nuclear project on a new site. When AECL opened a project office Saskatoon, senior management recognized the need for large scale staff training and made the necessary commitments. Two types of training programs were initiated, general and technical. The general training plan included topics related to nuclear project life cycle. Technical training was discipline and task specific. Based on the job descriptions and staff qualifications, technical training requirements were documented for the entire staff. The training strategy was developed and implemented. Detailed records were maintained to monitor the progress, draw conclusions, and plan training for future nuclear facilities. (author)

  19. IT Project Management Metrics

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available Many software and IT projects fail in completing theirs objectives because different causes of which the management of the projects has a high weight. In order to have successfully projects, lessons learned have to be used, historical data to be collected and metrics and indicators have to be computed and used to compare them with past projects and avoid failure to happen. This paper presents some metrics that can be used for the IT project management.

  20. Project management v praxi

    OpenAIRE

    Králová, Eliška

    2013-01-01

    Project management approaches are commonly used to write and implement business plans. In this thesis standard project management tools and methods are applied to a real project, which aims to improve the properties of the product it offers (an online educational game). This project is unique in that it is based on a voluntary basis, has limited resources and is very responsive to market demands. Project management is broken down into four stages according to the project life cycle: initiatio...

  1. Measurement of software project management effectiveness

    OpenAIRE

    Demir, Kadir Alpaslan

    2008-01-01

    Approved for public release; distribution is unlimited. Evaluating, monitoring, and improving the effectiveness of project management can contribute to successful acquisition of software systems. In this dissertation, we introduce a quantitative metric for gauging the effectiveness of managing a software-development project. The metric may be used to evaluate and monitor project management effectiveness in software projects by project managers, technical managers, executive man...

  2. MANAGING MULTICULTURAL PROJECT TEAMS

    Directory of Open Access Journals (Sweden)

    Cezar SCARLAT

    2014-06-01

    Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.

  3. Academy Sharing Knowledge (ASK). The NASA Source for Project Management Magazine. Volume 5

    Science.gov (United States)

    Post, Todd (Editor)

    2001-01-01

    How big is your project world? Is it big enough to contain other cultures, headquarters, hierarchies, and weird harpoon-like guns? Sure it is. The great American poet Walt Whitman said it best, 'I am large/I contain multitudes.' And so must you, Mr. and Ms. Project Manager. In this issue of ASK, we look outside the project box. See how several talented project managers have expanded their definition of project scope to include managing environments outside the systems and subsystems under their care. Here's a sampling of what we've put together for you this issue: In 'Three Screws Missing,' Mike Skidmore tells about his adventures at the Plesetek Cosmodrome in northern Russia. Ray Morgan in his story, 'Our Man in Kauai,' suggests we take a broader view of what's meant by 'the team.' Jenny Baer-Riedhart, the NASA program manager on the same Pathfinder solar-powered airplane, schools us in how to sell a program to Headquarters in 'Know Thyself--But Don't Forget to Learn About the Customer Too.' Scott Cameron of Proctor and Gamble talks about sharpening your hierarchical IQ in 'The Project Manager and the Hour Glass.' Mike Jansen in 'The Lawn Dart' describes how he and the 'voodoo crew' on the Space Shuttle Advanced Solid Rocket Motor program borrowed a harpoon-like gun from the Coast Guard to catch particles inside of a plume. These are just some of the stories you'll find in ASK this issue. We hope they cause you to stop and reflect on your own project's relationship to the world outside. We are also launching a new section this issue, 'There are No Mistakes, Only Lessons.' No stranger to ASK readers, Terry Little inaugurates this new section with his article 'The Don Quixote Complex.'

  4. Project management: importance for diagnostic laboratories.

    Science.gov (United States)

    Croxatto, A; Greub, G

    2017-07-01

    The need for diagnostic laboratories to improve both quality and productivity alongside personnel shortages incite laboratory managers to constantly optimize laboratory workflows, organization, and technology. These continuous modifications of the laboratories should be conducted using efficient project and change management approaches to maximize the opportunities for successful completion of the project. This review aims at presenting a general overview of project management with an emphasis on selected critical aspects. Conventional project management tools and models, such as HERMES, described in the literature, associated personal experience, and educational courses on management have been used to illustrate this review. This review presents general guidelines of project management and highlights their importance for microbiology diagnostic laboratories. As an example, some critical aspects of project management will be illustrated with a project of automation, as experienced at the laboratories of bacteriology and hygiene of the University Hospital of Lausanne. It is important to define clearly beforehand the objective of a project, its perimeter, its costs, and its time frame including precise duration estimates of each step. Then, a project management plan including explanations and descriptions on how to manage, execute, and control the project is necessary to continuously monitor the progression of a project to achieve its defined goals. Moreover, a thorough risk analysis with contingency and mitigation measures should be performed at each phase of a project to minimize the impact of project failures. The increasing complexities of modern laboratories mean clinical microbiologists must use several management tools including project and change management to improve the outcome of major projects and activities. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  5. Nurse manager residency program: an innovative leadership succession plan.

    Science.gov (United States)

    Watkins, Amy; Wagner, Jennifer; Martin, Christina; Grant, Brandy; Maule, Katrina; Resh, Kimberly; King, Lisa; Eaton, Holly; Fetter, Katrina; King, Stacey L; Thompson, Elizabeth J

    2014-01-01

    To ensure succession planning within the ranks of nurse managers meet current and projected nursing management needs and organizational goals, we developed and implemented a nurse manager residency program at our hospital. By identifying, supporting, and mentoring clinical experts who express a desire and display an aptitude for nursing leadership, we are graduating individuals who can transition to a nurse manager position with greater ease and competence.

  6. Non-Profit/Higher Education Project Management Series: Project Management (PM) Foundations

    Science.gov (United States)

    Burgher, Karl E.; Snyder, Michael B.

    2012-01-01

    This is the first in a series of forum articles on applying project management (PM) techniques and tools to the nonprofit sector with a focus on higher education. The authors will begin with a traditional look at project management because they believe that the integration of the tools and the processes associated with PM into many campus offices…

  7. Comprehensive management of project changes

    Directory of Open Access Journals (Sweden)

    Aljaž Stare

    2010-06-01

    Full Text Available The goal of this research was to examine how project changes can be prevented, and how to reduce their negative impact. Theoretical research examined risk management, project control and change management. Based on the study a “Comprehensive Change Management Model” was developed and verified after conducting empirical research in Slovenian enterprises. The research confirmed that risk management identifies possible changes and reduces their impact; project control ensures the timely detection of changes and an efficient response, while formal change management ensures the effective implementation of changes. The combined functioning of all three areas ensures effective project execution.

  8. Summary results of an assessment of research projects in the National Photovoltaics Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    The Office of Energy Research (OER) undertook an assessment of 115 research projects (listed in Appendix A) sponsored by the National Photovoltaics Program. The Program is located within the Office of Energy Efficiency and Renewable Energy (EE). This report summarizes the results of that review. The Office of Solar Energy Conversion is responsible for the management of the National Photovoltaics Program. This program focuses on assisting US industry in development of fundamental technology to bring advanced photovoltaic energy systems to commercial use. The purpose of the assessment was to determine the following: (1) the quality of research of individual projects; (2) the impact of these individual projects on the mission of the program; and (3) the priority of future research opportunities.

  9. Management of environmental and radiation data - the Olympic Dam project

    International Nuclear Information System (INIS)

    Jenkins, B.

    1987-01-01

    In terms of data management the Olympic Dam Project is in a process of transition from investigative studies to operational monitoring. The data management requirements for investigative studies are quite different requirements and indicates the progress taken in this transition, as well as the directions being taken to complete this transition. The environmental and radiation management programs for the Olympic Dam Project have already stored 70 megabytes of data on computer. With the comprehensive monitoring requirements which have been, or are in the process of being established for production operations, the volume of data is increasing. There are six main areas involving environmental and radiation data management: project area environmental monitoring; monitoring of the impact pathway from groundwater extraction for water supply to possible effects on mound springs; radiation levels in the environment; radiation exposures to designated employees; other occupational exposures in the mine; medical records relevant to occupational health

  10. Project Management and Total Quality Management : Complementary or confused?

    Directory of Open Access Journals (Sweden)

    Selma KATLANE BEN MLOUKA

    2009-01-01

    Full Text Available Quality management and project management appear as themes of strategic management today. The adoption of the project management constitutes a new way in organizing the production. It helps to cope with the complexity of the environment, to reduce the product life cycles and to make working arrangements more flexible. It should also adapt to the ICT revolution and restructuring of enterprises due to the dematerialisation of structures and transactions. Quality management, applied to more operations and strongly influenced by the quantitative approach seems compatible with project management. Indeed, the two paradigms emphasize the importance of customer satisfaction, teamwork, the role of leadership and the continuous improvement of processes and products. This paper aims to revisit the principles of relationship between total quality management and project management. Having shown the importance of incorporating fine patterns and project quality in business organization, we will explain how the ability to generate, select and conduct projects in an oriented accountability of management is able to enroll in a total quality.

  11. Process-based software project management

    CERN Document Server

    Goodman, F Alan

    2006-01-01

    Not connecting software project management (SPM) to actual, real-world development processes can lead to a complete divorcing of SPM to software engineering that can undermine any successful software project. By explaining how a layered process architectural model improves operational efficiency, Process-Based Software Project Management outlines a new method that is more effective than the traditional method when dealing with SPM. With a clear and easy-to-read approach, the book discusses the benefits of an integrated project management-process management connection. The described tight coup

  12. Office of Civilian Radioactive Waste Management Program Cost and Schedule Baseline

    International Nuclear Information System (INIS)

    1992-09-01

    The purpose of this document is to establish quantitative expressions of proposed costs and schedule to serve as a basis for measurement of program performance. It identifies the components of the Program Cost and Schedule Baseline (PCSB) that will be subject to change control by the Executive (Level 0) and Program (Level 1) Change Control Boards (CCBS) and establishes their baseline values. This document also details PCSB reporting, monitoring, and corrective action requirements. The Program technical baseline contained in the Waste Management System Description (WMSD), the Waste Management System Requirements (WMSR), and the Physical System Requirements documents provide the technical basis for the PCSB. Changes to the PCSB will be approved by the Pregrain Change Control Board (PCCB)In addition to the PCCB, the Energy System Acquisition Advisory Board Baseline CCB (ESAAB BCCB) will perform control functions relating to Total Project Cost (TPC) and major schedule milestones for the Yucca Mountain Site Characterization Project and the Monitored Retrievable Storage (MRS) Project

  13. Mathematical programming and financial objectives for scheduling projects

    CERN Document Server

    Kimms, Alf

    2001-01-01

    Mathematical Programming and Financial Objectives for Scheduling Projects focuses on decision problems where the performance is measured in terms of money. As the title suggests, special attention is paid to financial objectives and the relationship of financial objectives to project schedules and scheduling. In addition, how schedules relate to other decisions is treated in detail. The book demonstrates that scheduling must be combined with project selection and financing, and that scheduling helps to give an answer to the planning issue of the amount of resources required for a project. The author makes clear the relevance of scheduling to cutting budget costs. The book is divided into six parts. The first part gives a brief introduction to project management. Part two examines scheduling projects in order to maximize their net present value. Part three considers capital rationing. Many decisions on selecting or rejecting a project cannot be made in isolation and multiple projects must be taken fully into a...

  14. Summary and abstracts: Applied Research Units and Projects 1996 UCETF Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-05-21

    The Urban Consortium (UC), created by PTI, is a network of jurisdictions with populations of over 250,000. The UC provides a platform for research and enterprise through its Energy, Environmental, Transportation, and Telecommunications and Information Task Forces. The UC provides a unique creative forum where elected and appointed officials and technical managers identify, test, and validate practical ways to improve the provision of public services and, where possible, generate new revenue opportunities. Public Technology, Inc., is the non-profit technology organization of the National League of Cities, the National Association of Counties, and the International City/County Management Association. PTI creates and advances technology-based products, services, and enterprises in cities and counties nationwide. Staffed by PTI, the UC addresses the critical needs of local governments through its Task Forces. The Urban Consortium Energy Task Force (UCETF) program has, since its inception, acted as a laboratory to develop, test solutions and share the resulting products or management approaches with the wider audience of local governments. It has addressed the overlap between energy and environment and economic development policy issues, and, is the nation's most extensive cooperative local government program to improve energy management and decision-making through applied research and technology cooperation. Proposals to meet the specific objectives of the UCETF annual R and D program are solicited from major urban jurisdictions. Projects based on these proposals are then selected by the UCETF for direct conduct and management by staff of city and county governments. Projects selected for each year's program are organized in thematic units to assure effective management and ongoing peer-to-peer experience exchange, with results documented at the end of each program year.

  15. The Dust Management Project: Final Report

    Science.gov (United States)

    Hyatt, Mark J.; Straka, Sharon

    2011-01-01

    A return to the Moon to extend human presence, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere, will require investment in developing new technologies and capabilities to achieve affordable and sustainable human exploration. From the operational experience gained and lessons learned during the Apollo missions, conducting longterm operations in the lunar environment will be a particular challenge, given the difficulties presented by the unique physical properties and other characteristics of lunar regolith, including dust. The Apollo missions and other lunar explorations have identified significant lunar dust-related problems that will challenge future mission success. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems and human explorers. The Dust Management Project (DMP) is tasked with the evaluation of lunar dust effects, assessment of the resulting risks, and development of mitigation and management strategies and technologies related to Exploration Systems architectures. To this end, the DMP supports the overall goal of the Exploration Technology Development Program (ETDP) of addressing the relevant high priority technology needs of multiple elements within the Constellation Program (CxP) and sister ETDP projects. Project scope, approach, accomplishments, summary of deliverables, and lessons learned are presented.

  16. Entrepreneurship skills development through project-based activity in Bachelor of Pharmacy program.

    Science.gov (United States)

    Shahiwala, Aliasgar

    2017-07-01

    To provide pharmacy students with an opportunity to develop entrepreneurial thinking and skills. A business proposal building project-based activity was integrated into a two-credit hour pharmacy management course during the eighth semester of the bachelor of pharmacy degree program. The student groups submitted their proposals, mimicking the process of submitting business proposals and obtaining approval in the real world. Essential management tasks including operation procedures, location and layout design, inventory management, personnel management, marketing management, and finance management were taught step-by-step so that students could work on a similar scenario with their proposal building. Students' career preferences were also measured at the beginning and end of the course. Course was assessed by written exffigam and rubric based project evaluation. Student feedbacks of the project were collected using a five-point Likert scale. The project-based activity was well integrated in the course. The project helped the students (n=72) to understand management concepts more clearly, which was reflected by their significantly higher (pproject was successfully designed and executed in a pharmacy management course within a bachelor of pharmacy curriculum. Based on the response received in this project, efforts will be made to provide guidance and support to the students by calling field experts such as pharmacy owners and financiers. Copyright © 2017 Elsevier Inc. All rights reserved.

  17. Project Management with IT Security Focus

    OpenAIRE

    Felician Alecu; Paul Pocatilu; Sergiu Capisizu

    2011-01-01

    The paper focus on the main key points related to the IT security project management. The most important lifecycle stages are identified: IT security project proposal definition, project organization, project planning, quality planning, project team organization, IT security project activities management and project closing. The most important success factors for IT security projects are the support of top-management, customer satisfaction, prevention over remediation and continuous progress....

  18. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  19. Study on modular construction management in AP1000 nuclear plant project

    International Nuclear Information System (INIS)

    Fang Xiaopeng; Shen Wenrong; Sun Kebin; Wei Zhong

    2010-01-01

    The construction of AP1000 Nuclear Power Plant (NPP) has commenced in China. The AP1000 NPP features a passive design concept and modular construction technology. Based on the management of the construction of current AP1000 NNP, this paper describes the effects on Nuclear Island (NI) construction project management resulting from modular construction technology, as well as new construction techniques and methods. This paper puts forward new requirements for construction schedule management of the nuclear island construction at different levels. The AP1000 NI construction logic features the parallel construction of civil and structural erection as the main approach, with the integrated schedule of module fabrication, assembly and installation as support. The structural modules of AP1000 project are prefabricated in shop, delivered to site as sub-modules and assembled to integrated structural module. The assembled module is transported to the construction site, hoisted and finally set in NI. This paper illustrates how to ensure the construction quality of structural modules by analyzing the interface process and key links in the quality control program, and introduces how to ensure the safety of heavy structural components during various construction phases by evaluating and analyzing the construction safety process. This paper also makes an analysis of the safe environment for the assembly and installation of Containment Vessel, the management of product protection and personnel safety inside the Containment Building during 'Open Top' construction, raises to implement effective protection for the numerous pre-set mechanical modules and equipments, as well as personnel safety protection programs and measures. The modular construction feature of AP1000 NPP design requires technique improvement and management innovation during the NI construction. This paper makes a study and research on the control management of schedule, quality and safety of AP1000 NPP NI

  20. Water Resources Research Grant Program project descriptions, fiscal year 1987

    Science.gov (United States)

    ,

    1987-01-01

    This report contains information on the 34 new projects funded by the United States Geological Survey 's Water Resources Research Grant Program in fiscal year 1987 and on 3 projects completed during the year. For the new projects, the report gives the grant number, project title, performing organization, principal investigator(s), and a project description that includes: (1) identification of water related problems and problem-solution approach (2) contribution to problem solution, (3) objectives, and (4) approach. The 34 projects include 12 in the area of groundwater quality problems, 12 in the science and technology of water quality management, 1 in climate variability and the hydrologic cycle, 4 in institutional change in water resources management, and 5 in surface water management. For the three completed projects, the report furnishes the grant number; project title; performing organization; principal investor(s); starting data; data of receipt of final report; and an abstract of the final report. Each project description provides the information needed to obtain a copy of the final report. The report contains tables showing: (1) proposals received according to area of research interest, (2) grant awards and funding according to area of research interest, (3) proposals received according to type of submitting organization, and (4) awards and funding according to type of organization. (Author 's abstract)

  1. Enhancing the effectiveness of diabetes self-management education: the diabetes literacy project.

    Science.gov (United States)

    Van den Broucke, S; Van der Zanden, G; Chang, P; Doyle, G; Levin, D; Pelikan, J; Schillinger, D; Schwarz, P; Sørensen, K; Yardley, L; Riemenschneider, H

    2014-12-01

    Patient empowerment through self-management education is central to improving the quality of diabetes care and preventing Type 2 Diabetes. Although national programs exist, there is no EU-wide strategy for diabetes self-management education, and patients with limited literacy face barriers to effective self-management. The Diabetes Literacy project, initiated with the support of the European Commission, aims to fill this gap. The project investigates the effectiveness of diabetes self-management education, targeting people with or at risk of Type 2 Diabetes in the 28 EU Member States, as part of a comprehensive EU-wide diabetes strategy. National diabetes strategies in the EU, US, Taiwan, and Israel are compared, and diabetes self-management programs inventorized. The costs of the diabetes care pathway are assessed on a per person basis at national level. A comparison is made of the (cost)-effectiveness of different methods for diabetes self-management support, and the moderating role of health literacy, organization of the health services, and implementation fidelity of education programs are considered. Web-based materials are developed and evaluated by randomized trials to evaluate if interactive internet delivery can enhance self-management support for people with lower levels of health literacy. The 3-year project started in December 2012. Several literature reviews have been produced and protocol development and research design are in the final stages. Primary and secondary data collection and analysis take place in 2014. The results will inform policy decisions on improving the prevention, treatment, and care for persons with diabetes across literacy levels. © Georg Thieme Verlag KG Stuttgart · New York.

  2. Project Portfolio Management Applications Testing

    OpenAIRE

    Paul POCATILU

    2006-01-01

    Many IT companies are running project simultaneously. In order to achieve the best results, they have to group to the project in portfolios, and to use specific software that helps to manage them. Project portfolio management applications have a high degree of complexity and they are very important for the companies that are using it. This paper focuses on some characteristics of the testing process for project portfolio management applications

  3. Project risk management: A review of an institutional project life cycle

    Directory of Open Access Journals (Sweden)

    Wanjiru Gachie

    2017-11-01

    Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects

  4. Culture and conflict management style of international project managers

    OpenAIRE

    Mohammed, U. K.; Prabhakar, G. P.; White, G.

    2008-01-01

    The management of culture has become increasingly important to many organisations and business disciplines, particularly multicultural and international project management. Cultural differences often result in varying degrees of conflict and require careful consideration. This study surveys 116 Project Managers using the Thomas-Kilmann Conflict Mode Instrument to determine their approach toward managing conflict. Indian, French and UK Project Managers’ conflict management style are correlated...

  5. Managing Projects with KPRO

    Science.gov (United States)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  6. Mini Project Programming Exams

    DEFF Research Database (Denmark)

    Nørmark, Kurt; Thomsen, Lone Leth; Torp, Kristian

    2008-01-01

    A number of different types of final programming exams used or considered at the Department of Computer Science, Aalborg University, are identified and analyzed. Based on this analysis, a new type of programming exam is introduced called a Mini Project Programming (MIP) exam. MIP is a group...... years. The MIP exam is a compromise between (1) a long problem-based project exam and (2) a short oral or written programming exam. It is concluded that the strengths of MIP are the high degree of realism in the exam assignment and comprehensiveness relative to the course syllabus. The main challenge...

  7. Modelling the work flow of a nuclear waste management program

    Energy Technology Data Exchange (ETDEWEB)

    Hoeyer Mortensen, K. [Aarhus Univ., Computer Science Dept. (Denmark); Pinci, V. [Meta Software Corporation, Cambridge, MA (United States)

    1997-03-01

    In this paper we describe a modelling project to improve a nuclear waste management program in charge of the creation of a new system for the permanent disposal of nuclear waste. SADT (Structural Analysis and Design Technique) is used in order to provide a work-flow description of the functions to be performed by the waste management program. This description is then translated into a number of Coloured Petri Nets (CPN or CP-nets) corresponding to different program functions where additional behavioural inscriptions provide basis for simulation. Each of these CP-nets is simulated to produce timed event charts that are useful for understanding the behaviour of the program functions under different scenarios. Then all the CPN models are linked together to form a single stand-alone application that is useful for validating the interaction and cooperation between the different program functions. A technique for linking executable CPN models is developed for supporting large modelling projects and parallel development of independent CPN models. (au) 11 refs.

  8. Modelling the work flow of a nuclear waste management program

    International Nuclear Information System (INIS)

    Hoeyer Mortensen, K.; Pinci, V.

    1997-03-01

    In this paper we describe a modelling project to improve a nuclear waste management program in charge of the creation of a new system for the permanent disposal of nuclear waste. SADT (Structural Analysis and Design Technique) is used in order to provide a work-flow description of the functions to be performed by the waste management program. This description is then translated into a number of Coloured Petri Nets (CPN or CP-nets) corresponding to different program functions where additional behavioural inscriptions provide basis for simulation. Each of these CP-nets is simulated to produce timed event charts that are useful for understanding the behaviour of the program functions under different scenarios. Then all the CPN models are linked together to form a single stand-alone application that is useful for validating the interaction and cooperation between the different program functions. A technique for linking executable CPN models is developed for supporting large modelling projects and parallel development of independent CPN models. (au) 11 refs

  9. 44 CFR 206.438 - Project management.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for project...

  10. The INEL approach: Environmental Restoration Program management and implementation methodology

    International Nuclear Information System (INIS)

    1996-01-01

    The overall objectives of the INEL Environmental Restoration (ER) Program management approach are to facilitate meeting mission needs through the successful implementation of a sound, and effective project management philosophy. This paper outlines the steps taken to develop the ER program, and explains further the implementing tools and processes used to achieve what can be viewed as fundamental to a successful program. The various examples provided will demonstrate how the strategies for implementing these operating philosophies are actually present and at work throughout the program, in spite of budget drills and organizational changes within DOE and the implementing contractor. A few of the challenges and successes of the INEL Environmental Restoration Program have included: a) completion of all enforceable milestones to date, b) acceleration of enforceable milestones, c) managing funds to reduce uncosted obligations at year end by utilizing greater than 99% of FY-95 budget, d) an exemplary safety record, e) developing a strategy for partial Delisting of the INEL by the year 2000, f) actively dealing with Natural Resource Damages Assessment issues, g) the achievement of significant project cost reductions, h) and implementation of a partnering charter and application of front end quality principles

  11. A Performance Management Initiative for Local Health Department Vector Control Programs.

    Science.gov (United States)

    Gerding, Justin; Kirshy, Micaela; Moran, John W; Bialek, Ron; Lamers, Vanessa; Sarisky, John

    2016-01-01

    Local health department (LHD) vector control programs have experienced reductions in funding and capacity. Acknowledging this situation and its potential effect on the ability to respond to vector-borne diseases, the U.S. Centers for Disease Control and Prevention and the Public Health Foundation partnered on a performance management initiative for LHD vector control programs. The initiative involved 14 programs that conducted a performance assessment using the Environmental Public Health Performance Standards. The programs, assisted by quality improvement (QI) experts, used the assessment results to prioritize improvement areas that were addressed with QI projects intended to increase effectiveness and efficiency in the delivery of services such as responding to mosquito complaints and educating the public about vector-borne disease prevention. This article describes the initiative as a process LHD vector control programs may adapt to meet their performance management needs. This study also reviews aggregate performance assessment results and QI projects, which may reveal common aspects of LHD vector control program performance and priority improvement areas. LHD vector control programs interested in performance assessment and improvement may benefit from engaging in an approach similar to this performance management initiative.

  12. Environmental management audit, Uranium Mill Tailings Remedial Action Project (UMTRA)

    International Nuclear Information System (INIS)

    1993-01-01

    The Office of Environment, Safety and Health (EH) has established, as part of the internal oversight responsibilities within Department of Energy (DOE), a program within the Office of Environmental Audit (EH-24), to conduct environmental audits at DOE's operating facilities. This document contains the results of the Environmental Management Audit of the Uranium Mill Tailings Remedial Action (UMTRA) Project. This Environmental Management Audit was conducted by the DOE's Office of Environmental Audit from October 26 through November 6, 1992. The audit's objective is to advise the Secretary as to the adequacy of UMTRA's environmental programs, and management organization in ensuring environmental protection and compliance with Federal, state, and DOE environmental requirements. This Environmental Management Audit's scope was comprehensive and covered all areas of environmental management with the exception of environmental programs pertaining to the implementation of the requirements of the National Environmental Policy Act (NEPA), which is the responsibility of the DOE Headquarters Office of NEPA Oversight

  13. Project management and performance management: potential transdisciplinary contributions

    Directory of Open Access Journals (Sweden)

    Gerrit van der Waldt

    2012-12-01

    Full Text Available As project management and performance management as management applications gain momentum in public sector settings, the question often arise as to if, how, and when these applications should complement each other in various policy implementation and service delivery initiatives. Answers to this question should be sought from various vantage points or perspectives. These vantage points may range from macro, meso, micro as well as theoretical-methodological perspectives. The purpose of this paper is to unlock the potential for transdisciplinary contributions between Project Management and Performance Management by focusing on the methodologies, functional areas, and practical applications of both management disciplines. It is argued that the respective methodologies and their processes should be unpacked to identify the timing or moment when each discipline could, and should, make a contribution to the success of the other. This will add value to the theoretical underpinnings and practical applications of both study domains in the public sector. The respective contributions are illustrated by means of application realities of both management practices in the South African Public Service. Keywords: project management, performance management, Public Sector applications, transdisciplinarity Disciplines: project management, performance management

  14. 2008 Federal Energy Management Program (FEMP) Market Report

    Energy Technology Data Exchange (ETDEWEB)

    Tremper, C.

    2009-07-01

    This report assesses the market for Federal Energy Management Program (FEMP) services as it existed in FY 2008. It discusses Federal energy management goal progress in FY 2008, and examines the environment in which agencies implemented energy management projects over the last three years. The report also discusses some recent events that will increase the market for FEMP services, and outlines FEMP's major strategies to address these changes in FY 2009 and beyond.

  15. Project Portfolio Management Applications Testing

    Directory of Open Access Journals (Sweden)

    Paul POCATILU

    2006-01-01

    Full Text Available Many IT companies are running project simultaneously. In order to achieve the best results, they have to group to the project in portfolios, and to use specific software that helps to manage them. Project portfolio management applications have a high degree of complexity and they are very important for the companies that are using it. This paper focuses on some characteristics of the testing process for project portfolio management applications

  16. Environmental Management Integration Project/Mixed Waste Focus Area Partnership

    International Nuclear Information System (INIS)

    Gombert, D.; Kristofferson, K.; Cole, L.

    1999-01-01

    On January 16, 1998, the Assistant Secretary for the Environmental Management (EM) Program at the Department of Energy, issued DOE-Idaho the Program Integration and Systems Engineering Guidance for Fiscal Year 1998, herein called Guidance, which directed that program integration tasks be performed for all EM program areas. This guidance directed the EM Integration team, as part of the Task 1, to develop baseline waste and material disposition maps which are owned by the site Project Baseline Summary (PBS) manager. With these baselines in place Task 2 gave direction to link Science and Technology activities to the waste and material stream supported by that technology. This linkage of EM Program needs with the OST activities supports the DOE goal of maximizing cleanup at DOE sites by 2006 and provides a defensible science and technology program. Additionally, this linkage is a valuable tool in the integration of the waste and material disposition efforts for the DOE complex

  17. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    Science.gov (United States)

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  18. Chernobyl post-accident management: the ETHOS project.

    Science.gov (United States)

    Dubreuil, G H; Lochard, J; Girard, P; Guyonnet, J F; Le Cardinal, G; Lepicard, S; Livolsi, P; Monroy, M; Ollagnon, H; Pena-Vega, A; Pupin, V; Rigby, J; Rolevitch, I; Schneider, T

    1999-10-01

    ETHOS is a pilot research project supported by the radiation protection research program of the European Commission (DG XII). The project provides an alternative approach to the rehabilitation of living conditions in the contaminated territories of the CIS in the post-accident context of Chernobyl. Initiated at the beginning of 1996, this 3-y project is currently being implemented in the Republic of Belarus. The ETHOS project involves an interdisciplinary team of European researchers from the following institutions: the Centre d'etude sur l'Evaluation de la Protection dans le domaine Nucleaire CEPN (radiological protection, economics), the Institute National d'Agronomie de Paris-Grignon INAPG (agronomy, nature & life management), the Compiegne University of Technology (technological and industrial safety, social trust), and the Mutadis Research Group (sociology, social risk management), which is in charge of the scientific co-ordination of the project. The Belarussian partners in the ETHOS project include the Ministry of Emergencies of Belarus as well as the various local authorities involved with the implementation site. The ETHOS project relies on a strong involvement of the local population in the rehabilitation process. Its main goal is to create conditions for the inhabitants of the contaminated territories to reconstruct their overall quality of life. This reconstruction deals with all the day-to-day aspects that have been affected or threatened by the contamination. The project aims at creating a dynamic process whereby acceptable living conditions can be rebuilt. Radiological security is developed in the ETHOS project as part of a general improvement in the quality of life. The approach does not dissociate the social and the technical dimensions of post-accident management. This is so as to avoid radiological risk assessment and management being reduced purely to a problem for scientific experts, from which local people are excluded, and to take into

  19. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  20. Experiential learning in control systems laboratories and engineering project management

    Science.gov (United States)

    Reck, Rebecca Marie

    2015, a panel of 40 control systems faculty members, from a variety of institutions, completed a multi-round Delphi survey in order to bring them toward consensus on the common aspects of their laboratories. The following winter, 45 additional faculty members and practitioners from the control systems community completed a follow-up survey to gather feedback on the results of the Delphi survey. During the Delphi study, the panelists identified 15 laboratory objectives, 26 concepts, and 15 components that were common in their laboratories. Then in both the Delphi survey and follow-up survey each participant rated the importance of each of these items. While the average ratings differed slightly between the two groups, the order of each set of items was compared with two different tests and the order was found to be similar. Some of the common and important learning objectives include connecting theory to what is implemented and observed in the laboratory, designing controllers, and modeling and simulating systems. The most common component in both groups was Math-Works software. Some of the common concepts include block diagrams, stability, and PID control. Defining common aspects of undergraduate control systems laboratories enables common development, detailed comparisons, and simplified adaptation of equipment and experiments between campuses and programs. Throughout an undergraduate program in engineering, there are multiple opportunities for hands-on laboratory experiences that are related to course content. However, a similarly immersive experience for project management graduate students is harder to incorporate for all students in a course at once. This study explores an experiential learning opportunity for graduate students in engineering management or project management programs. The project management students enroll in a project management course. Undergraduate students interested in working on a project with a real customer enroll in a different projects

  1. Project Management Plan Solution Stabilization

    International Nuclear Information System (INIS)

    SATO, P.K.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process

  2. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  3. SAT project introduction: management issues

    International Nuclear Information System (INIS)

    Kazennov, A.Yu.

    1998-01-01

    Management issues of introducing SAT Project include main objectives and expectations; SAT goal and management; major phases of SAT implementation; project quality assurance; SAT based training system and procedures; role of the project team qualifications

  4. Improving Project Portfolio Management (PPM) for Improvement Projects

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Jakobsen, Peter M.; Korsaa, Morten

    2017-01-01

    Project Portfolio Management (PPM) focus on the integration and alignment of projects with the business operation in order to achieve most value and cost-efficiency for the investment in projects. PPM is often a challenge and especially so for improvement projects where PPM is considerably...... of evaluating a portfolio of improvement projects and combine this evaluation with the effect they have on the CMMI maturity level. Further, the paper demonstrates how the combination of a strong senior management requirement for improved maturity and the focus on getting the most value out of PPM made...

  5. The development of the Waste Isolation Pilot Plant (WIPP) project's public affairs program

    International Nuclear Information System (INIS)

    Walter, L.H.

    1988-01-01

    The Waste Isolation Pilot Plant (WIPP) offers a perspective on the value of designing flexibility into a public affairs program to enable it to grow with and complement a project's evolution from construction through to operations. This paper discusses how the WIPP public affairs program progressed through several stages to its present scope. During the WIPP construction phase, the public affairs program laid a foundation for Project acceptance in the community. A speaker's bureau, a visitors program, and various community outreach and support programs emphasized the educational and socioeconomic benefits of having this controversial project in Carlsbad. Then, in this past year as the project entered a preoperational status, the public affairs program emphasis shifted to broaden the positive image that had been created locally. In this stage, the program promoted the project's positive elements with the various state agencies, government officials, and federal organizations involved in our country's radioactive waste management and transportation program. Currently, an even broader, more aggressive public affairs program is planned. During this stage public affairs will be engaged in a comprehensive institutional and outreach program, explaining and supporting WIPP's mission in each of the communities and agencies affected by the operation of the country's first geologic repository

  6. The evolution of the Waste Isolation Pilot Plant (WIPP) project's public affairs program

    International Nuclear Information System (INIS)

    Walter, L.H.

    1988-01-01

    As a first-of-a-kind facility, the Waste Isolation Pilot Plant (WIPP) presents a unique perspective on the value of designing a public affairs program that grown with and complements a project's evolution from construction to operations. Like the project itself, the public affairs programs progressed through several stages to its present scope. During the construction phase, foundations were laid in the community. Then, in this past year as the project entered a preoperational status, emphasis shifted to broaden the positive image that had been created locally. In this stage, public affairs presented the project's positive elements to the various state agencies, government officials, and federal organizations involved in our country's radioactive waste management program. Most recently, and continuing until receipt of the first shipment of waste in October 1988, an even broader, more aggressive public affairs program is planned

  7. Syracuse/NASA program: A historical critique: Multidisciplinary studies in management and development programs in the public sector

    Science.gov (United States)

    Barzelay, M. E.

    1974-01-01

    A historical critique is presented of the Syracuse/NASA program on management and development programs. Brief summaries are included of each of the major projects undertaken, including identification of the principal investigators and the university departments and disciplines involved.

  8. PROJECT MANAGEMENT FOR THE STATE-GOVERNED GEOLOGICAL EXPLORATION OF MINERAL RESOURCES

    Directory of Open Access Journals (Sweden)

    A. M. Lygin

    2018-03-01

    Full Text Available The relevance of the research. Creating high-efficient and innovation-oriented system of studying the subsoil and the mineral resource base is one of the priority areas of developing the geological sphere. The purpose of the present study is to substantiate the rationale for the adoption of the project management methods for the exploration work. Research methods: method of system analysis, method of comparison and analogies, and method of scientific generalization. The results and their application. This article deals with the content of the main standard legislative documents which determine the strategy and lines of the country’s geological sector development in the nearest future. The article discloses the purposes and their strategic objectives and the content of the state program of the Russian Federation called “Reproduction and use of natural resources”. The resource support of the program and its subroutines is also revealed. The structure of geological industry management in modern conditions is presented. The main activities for restructuring of the geological industry are set out. They include the following points. The transformation of the Federal state unitary enterprises of information and expert profile, the advancement of scientific organizations engaged in scientific and analytical support of performed public functions. These functions are concerned with the geological study of subsoil and reproduction of the mineral resource base, as well as improving its management. The consolidation of specialized geological organizations on the types of exploration and mining, and also the main results of reorganization of the enterprises is taken into account. All of the aforementioned is subordinated to and is conducted by the Federal Agency for subsoil management. The shortcomings of the current system of management of works on the state geological study of the subsoil were revealed at the expense of the Federal budget. The

  9. Blazing the energy trail: The Municipal Energy Management Program

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    The Urban Consortium Energy Task Force pioneers energy and environmental solutions for US cities and counties. When local officials participate in the task force, they open the door to many resources for their communities. The US is entering a period of renewed interest in energy management. Improvements in municipal energy management allow communities to free up energy operating funds to meet other needs. These improvements can even keep energy dollars in the community through the purchase of services and products used to save energy. With this idea in mind, the US Department of Energy Municipal Energy Management Program has funded more than 250 projects that demonstrate innovative energy technologies and management tools in cities and counties through the Urban Consortium Energy Task Force (UCETF). UCETF helps the US Department of Energy foster municipal energy management through networks with cities and urbanized counties and through links with three national associations of local governments. UCETF provides funding for projects that demonstrate innovative and realistic technologies, strategies, and methods that help urban America become more energy efficient and environmentally responsible. The task force provides technical support to local jurisdictions selected for projects. UCETF also shares information about successful energy management projects with cities and counties throughout the country via technical reports and project papers. The descriptions included here capsulize a sample of UCETF`s demonstration projects around the country.

  10. SharePoint 2010 for Project Management

    CERN Document Server

    Sy, Dux

    2012-01-01

    If you were to analyze your team's performance on a typical project, you'd be surprised how much time is wasted on non-productive tasks. This hands-on guide shows you how to work more efficiently by organizing and managing projects with SharePoint 2010. You'll learn how to build a Project Management Information System (PMIS), customized to your project, that can effectively coordinate communication and collaboration among team members. Written by a certified Project Management Professional (PMP) and Microsoft SharePoint MVP with 15 years of IT project management experience, each chapter incl

  11. Management of citation verification requests for multiple projects at Sandia National Laboratories

    International Nuclear Information System (INIS)

    Crawford, C.S.

    1995-01-01

    Sandia National Laboratories' (SNL) Technical Library is now responsible for providing citation verification management support for all references cited in technical reports issued by the Nuclear Waste Management (NWM) Program. This paper dancing how this process is managed for the Yucca Mountain Site Characterization (YWP), Waste Isolation Pilot Plant (WIPP), Idaho National Engineering Laboratory (INEL), and Greater Confinement Disposal (GCD) projects. Since technical reports are the main product of these projects, emphasis is placed on meeting the constantly evolving needs of these customers in a timely and cost-effective manner

  12. Agile Project Management for e-Learning Developments

    Science.gov (United States)

    Doherty, Iain

    2010-01-01

    We outline the project management tactics that we developed in praxis in order to manage elearning projects and show how our tactics were enhanced through implementing project management techniques from a formal project management methodology. Two key factors have contributed to our project management success. The first is maintaining a clear…

  13. The project manager's desk reference: project planning, schedulding, evaluation, control, systems

    National Research Council Canada - National Science Library

    Lewis, James P

    2007-01-01

    In this Third Edition of The Project Manager's Desk Reference, top project management consultant James Lewis arms you with today's most comprehensive and understandable project management resources...

  14. Project and Sports Events Management

    OpenAIRE

    Sebastian Madalin MUNTEANU

    2011-01-01

    This paper tries to capture the importance it holds the project management in socio-cultural sector which stands out when we refer to the sport. So when we talk about project management in sport, to consider a much larger vision, a new project management perspective, they involve a responsibility for the implementation of an event with global impact on very long term. Sports projects, as history shows us, played a significant role in developing societies. Also, all major sports industry proje...

  15. Relationship between time management in construction industry and project management performance

    Science.gov (United States)

    Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin

    2016-08-01

    Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.

  16. 7 CFR 1210.311 - Programs and projects.

    Science.gov (United States)

    2010-01-01

    ... PROMOTION PLAN Watermelon Research and Promotion Plan Definitions § 1210.311 Programs and projects. Programs and projects mean those research, development, advertising, or promotion programs or projects...

  17. Research and Grant Management: The Role of the Project Management Office (PMO) in a European Research Consortium Context

    Science.gov (United States)

    Wedekind, Gerben Kristian; Philbin, Simon Patrick

    2018-01-01

    This paper illustrates how a university-based project management office (PMO) can provide focused support across the entire grant project lifecycle within a European research context. In recent years, EU (European Union) research and innovation grant programs have increasingly shifted to support multidisciplinary consortia composed of industry,…

  18. Cost Control and Performance Review of Software Projects by Using the Earned Value Management

    Directory of Open Access Journals (Sweden)

    Felician ALECU

    2014-08-01

    Full Text Available EVM (Earned Value Management is a method that can be successfully used to measure the performance of a project from the cost and schedule points of view. Initially developed for the US government programs in the 60s, it later becomes an important feature of any modern project management practice thanks to its simplicity and efficiency in signaling project anomalies in time. EVM become extremely popular because it can be equally applied for any project in any industry.

  19. Waste Management Program management plan. Revision 1

    International Nuclear Information System (INIS)

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management's objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL

  20. Modern project management theory and knowledge framework

    Institute of Scientific and Technical Information of China (English)

    Luo Zhongbao

    2014-01-01

    The scholars increasingly pay at ention to the internal rules in knowledge development and innovation of construction engineering management,as wel as the framework for engineering management body of knowledge. Considering the one-of-a-kind characteristic of construction project s and highly dependence from projects on management knowledge and its innovation,this paper analyzed the knowledge body of engineering management and its development dimension ,such as thinking and knowledge structure dimensions. The engineering management knowledge innovation model and structural model were put forward. The paper reviewed and proposed the engineering management knowledge system framework under engineering thinking mode,including the basic knowledge system framework which is used in engineering management research ,and a framework for body of knowledge which is applicable for engineering management practice. Based on a brief analysis of engineering management practice,this paper analyzed the development progres of engineering management from engineering thinking to ethical thinking and philosophical thinking. A dynamic model formed from the modern engineering management theory was put forward. The construction of projects are divided into two stages:an investment decision-making stage, and project implementation stage. According to the fact that project owners obtain the project products by transaction,the management during project implementation stage are divided into two aspects:project transaction management for the owner, and construction project management for the contractor. Thus, the three theoretical modules of modern engineering management were established:project investment decision-making management theory,engineering transaction management theory, and engineering project management theory. This paper further analyzed the content and basic theoretical issues of each theoretical module.

  1. Waste Management Program management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management`s objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL.

  2. Plant life management in Belgium: an integrated project

    International Nuclear Information System (INIS)

    Wacquier, W.; Smet, M. de; Hennart, J.C.; Greer, J.L.; Breesch, Ch.; Havard, P.

    2001-01-01

    In Belgium, a specific plant life management project, named ''Continuous Operation of Belgian NPPs'' is currently developing. Its final objective is to centralize all safety and economic aspects of plant life management in order to determine, for each NPP unit, the optimal actions required to maintain their safe and reliable operation. As the lifetime of safety-related active components is permanently controlled by the current maintenance programs, the project focuses only on passive safety-related components and on non-safety components important for the availability of the plants. These structures and components were evaluated and compared on the basis of a set of weighted criteria in order to measure their criticality and to identify those which must be considered in the project. The selection and the ranking of those components is based on the KBM TM methodology (Knowledge Based Maintenance). This methodology facilitates the collection, formalization and exchange of know-how and gives immediate results thanks to a sequential and systematic step by step analysis. (author)

  3. Competency model for the project managers of technical projects

    Science.gov (United States)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  4. NEURO-FUZZY MODELING APPLIED IN PROGRAM MANAGEMENT TO INCREASE LOCAL PUBLIC ADMINISTRATION PERFORMANCE

    Directory of Open Access Journals (Sweden)

    Adrian-Mihai Zaharia-Radulescu

    2016-07-01

    Full Text Available One of the challenges in local public administration is dealing with an increasing number of competing requests coming from the communities they serve. The traditional approach would be to handle each request as a standalone project and be prioritized according to benefits and budget available. More and more nowadays program management is becoming a standard approach in managing the initiatives of local public administration. Program management approach is itself an enabler for performance in public sector organizations by allowing an organization to better coordinate its efforts and resources in managing a portfolio of projects. This paper aims to present how neuro-fuzzy modeling applied in program management can help an organization to increase its performance. Neuro-fuzzy modeling would lead organizations one step further by allowing them to simulate different scenarios and manage better the risks accompanying their initiatives. The research done by the authors is theoretical and combines knowledge from different areas and a neuro-fuzzy model is proposed and discussed.

  5. Locale-Specific Categorization of IT Projects for Proper Project Management

    Directory of Open Access Journals (Sweden)

    Muhammad Nasir

    2015-12-01

    Full Text Available In this paper we aim to show that not only are the project management techniques important for small-scale projects, but following proper project management techniques is one of the most important requirements. However, there come slight variations in implementing project management techniques in small projects as compared with larger projects. Therefore, proper categorization of projects holds the key to success in many situations. Our paper will show that categorization of a project as small-scale or large-scale should always be locale specific. In this regards, we develop a criteria and evaluate how the projects are categorized as small-scale and large-scale in different parts of the world with focus on IT projects. This research concludes that some methods cannot be used for projects of different scales.

  6. TERMINOLOGY MANAGEMENT FRAMEWORK DEVIATIONS IN PROJECTS

    Directory of Open Access Journals (Sweden)

    Олена Борисівна ДАНЧЕНКО

    2015-05-01

    Full Text Available The article reviews new approaches to managing projects deviations (risks, changes, problems. By offering integrated control these parameters of the project and by analogy with medical terminological systems building a new system for managing terminological variations in the projects. With an improved method of triads system definitions are analyzed medical terms that make up terminological basis. Using the method of analogy proposed new definitions for managing deviations in projects. By using triad integrity built a new system triad in project management, which will subsequently also analogous to develop a new methodology of deviations in projects.

  7. Project brief of pre-contract in project management

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim; Mohd Azmi Sidid Omar; Abdul Rahman Norazumin; Zakaria Dris; Abdul Murad Abu Bakar; Alwi Othman

    2010-01-01

    Project brief is a comprehensive document used in translating the user needs and requirement for the project implementation. This document is important for the designer as a main guidance towards establishing project details. Research shown that problem usually arises from not well-defined scope and needs by the user. With lack of information the designer tend to assume and interprets wrong translation. Other issues arise from project management are time, cost, budgetary, lack of communication and establishing quality management. Some ideas of improvement were gain by doing cross reference with JKR quality system management, workshop and brainstorming. It shows that an improvement of data collection system has to be integrating with some basic format details, drawings and declaration forms to be established. (author)

  8. Lessons learned: Managing the development of a corporate Ada training project

    Science.gov (United States)

    Blackmon, Linda F.

    1986-01-01

    The management lessons learned during the implementation of a corporate mandate to develop and deliver an effective Ada training program to all divisions are discussed. The management process involved in obtaining cooperation from all levels in the development of a corporate-wide project is described. The problem areas are identified along with some possible solutions.

  9. Summary results of an assessment of research projects in the Nuclear Medicine Research program

    International Nuclear Information System (INIS)

    1988-01-01

    In May 1987, OHER management requested the Office of Program Analysis (OPA) to conduct a peer review of the projects of the DOE Nuclear Medicine Research program. This was done using procedures and a quantitative methodology OPA developed for assessing DOE research programs. Sixty-three individual nuclear medicine projects were reviewed by seven panels; one panel on isotopes and radioisotopes, three on radiopharmacology, two on clinical feasibility, and one on instrumentation. Each panel consisted of five to ten knowledgeable reviewers. 5 figs

  10. MANAGE INTERESTED PARTIES IN PROJECT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    BILOKON A. I.

    2016-04-01

    Full Text Available The success or failure of the project often depends on factors which related to the environment, surrounded by the project and which are outside of the direct control of the project manager. The concept of the project environment, the processes of environmental analysis of the project and the ways in which managers can identify potential problems and develop a plan of action to ensure the success of the project. The management strategy the main factors of the environment includes both organizational forms and measures which aimed at the development process. For alignment of the organizational forms of communication manager must have a clear idea: what kind of interested persons and their actions (functions need to monitor, and in what form to maintain communication (bilateral relations of interdependence. This information is key to the further construction of the formal organization that supports interaction, the definition of its functions, competencies, allocation of roles, areas of responsibility, instructions, forms and methods of work. Purpose. Summarize, analyze and form an idea of the potential of existing approaches to the management of the project environment. Object of study. Management processes of the persons, who interested in the project environment. Subject of study. Methods and tools for the project management environment.

  11. Female Project Managers' Workplace Problems: a Survey

    Science.gov (United States)

    Duong, Thuong Thi; Skitmore, Martin

    This article examines the extent to which challenges in the workplace may cause female project managers to be in a significantly small minority. A survey of members of the Australian Institute of Project Management in Queensland is described. This compares the experiences and observations of both men and women on various issues related to technical and gender aspects in project management workplaces. The results show that although female project managers experience many problems, male project managers also experience most of the same problems. Likewise, there are also few differences between more and less experience, the level of management, and types of industries. The differences that do occur involve discrimination against women in general, differences in project management styles, and support from other project managers.

  12. ADVERTISEMENTS FOR ICT PROJECT MANAGERS SHOW DIVERSITY BETWEEN SWEDISH EMPLOYERS’ AND PROJECT MANAGEMENT ASSOCIATIONS’ VIEWS OF PM CERTIFICATIONS

    Directory of Open Access Journals (Sweden)

    Siw Lundqvist

    2014-05-01

    Full Text Available Appointing ICT project managers is a delicate issue for management; not least since ICT projects are known to be unsuccessful in delivering the required product in time and on budget. Hence, it is even more important to find the “right” individual for the job. According to project management associations, certification in project management is a prerequisite for a project manager’s successful career. The appreciation of project management certifications among Swedish employers was studied using data collected from job advertisements for ICT project managers during four years (2010-2013. Judged on how the advertisements were worded the result indicates surprisingly low interest from the employers’ side, which conflicts with the project management associations statements about the certifications’ indispensable value for successful projects. Furthermore, it conflicts with a common understanding of certifications as essential for appointment as a project manager. The findings identify a possible gap between PM associations’ and employers’ views regarding the certifications’ value, and highlight the necessity of seriously considering whether it is worthwhile for the individuals to strive for, and for the organizations to promote certification, since it is costly in both time, effort and money.

  13. User's operating procedures. Volume 2: Scout project financial analysis program

    Science.gov (United States)

    Harris, C. G.; Haris, D. K.

    1985-01-01

    A review is presented of the user's operating procedures for the Scout Project Automatic Data system, called SPADS. SPADS is the result of the past seven years of software development on a Prime mini-computer located at the Scout Project Office, NASA Langley Research Center, Hampton, Virginia. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, two (2) of three (3), provides the instructions to operate the Scout Project Financial Analysis program in data retrieval and file maintenance via the user friendly menu drivers.

  14. Leadership and management influences the outcome of wildlife reintroduction programs: findings from the Sea Eagle Recovery Project

    Directory of Open Access Journals (Sweden)

    Alexandra E. Sutton

    2015-06-01

    Full Text Available Wildlife reintroductions and translocations are statistically unlikely to succeed. Nevertheless, they remain a critical part of conservation because they are the only way to actively restore a species into a habitat from which it has been extirpated. Past efforts to improve these practices have attributed the low success rate to failures in the biological knowledge (e.g., ignorance of social behavior, poor release site selection, or to the inherent challenges of reinstating a species into an area where threats have already driven it to local extinction. Such research presumes that the only way to improve reintroduction outcomes is through improved biological knowledge. This emphasis on biological solutions may have caused researchers to overlook the potential influence of other factors on reintroduction outcomes. I employed a grounded theory approach to study the leadership and management of a successful reintroduction program (the Sea Eagle Recovery Project in Scotland, UK and identify four critical managerial elements that I theorize may have contributed to the successful outcome of this 50-year reintroduction. These elements are: 1. Leadership & Management: Small, dedicated team of accessible experts who provide strong political and scientific advocacy (“champions” for the project. 2. Hierarchy & Autonomy: Hierarchical management structure that nevertheless permits high individual autonomy. 3. Goals & Evaluation: Formalized goal-setting and regular, critical evaluation of the project’s progress toward those goals. 4. Adaptive Public Relations: Adaptive outreach campaigns that are open, transparent, inclusive (esp. linguistically, and culturally relevant.

  15. Project management approach for the Waste Area Grouping 6 Closure/Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1992-07-01

    This document has been developed as a preliminary definition of the Waste Area Grouping (WAG) 6 Closure Project Management Approach. The purpose of this document is to identify the roles and responsibilities of the various project team members and to identify the project scope, schedule and budget. This document is intended to be a living document. As information develops, this document will be revised to create a WAG 6 Project Management Plan (PMP). The PMP will provide additional focus to the information contained in this document. The information required will be available as the selected alternative for remediation of WAG 6 is approved and Remedial Action Plans are conceptualized. This document has been reviewed against, and is intended to be consistent with, the Environmental Restoration Program Management Plan

  16. WE-G-BRB-02: The Role of Program Project Grants in Study of 3D Conformal Therapy, Dose Escalation and Motion Management

    International Nuclear Information System (INIS)

    Fraass, B.

    2015-01-01

    Over the past 20 years the NIH has funded individual grants, program projects grants, and clinical trials which have been instrumental in advancing patient care. The ways that each grant mechanism lends itself to the different phases of translating research into clinical practice will be described. Major technological innovations, such as IMRT and proton therapy, have been advanced with R01-type and P01-type funding and will be discussed. Similarly, the role of program project grants in identifying and addressing key hypotheses on the potential of 3D conformal therapy, normal tissue-guided dose escalation and motion management will be described. An overview will be provided regarding how these technological innovations have been applied to multi-institutional NIH-sponsored trials. Finally, the panel will discuss regarding which research questions should be funded by the NIH to inspire the next advances in radiation therapy. Learning Objectives: Understand the different funding mechanisms of the NIH Learn about research advances that have led to innovation in delivery Review achievements due to NIH-funded program project grants in radiotherapy over the past 20 years Understand example advances achieved with multi-institutional clinical trials NIH

  17. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  18. The indicators of the management system of projects of research, development and technological innovation of the Cuban Nuclear program

    International Nuclear Information System (INIS)

    Rodriguez Cardona, R.; Cobas Aranda, M.

    2012-01-01

    Organizations responsible for managing projects organised in programmes and projects, require as one of their main demands for the implementation of effective project management systems, i.e., in which to achieve the planned activities and expected results to be achieved. Indicators are key for any system management tools for its management. The objective of this work is to show a set of indicators used by the management system (SGP) projects of I+D+i (research, development and technological innovation) of the nuclear sector, which demonstrate that these indicators have correlation and are feasible for the characterization and management of the system. (author)

  19. Project Management in Higher Education

    Science.gov (United States)

    Alpert, Shannon Atkinson

    2011-01-01

    This study identified factors that influenced the use of project management in higher education research projects. Using a qualitative grounded theory approach that included in-depth interviews with assistant professors, the researcher examined how these individuals were using project management processes and tools and factors that enabled,…

  20. On Services for Collaborative Project Management

    Science.gov (United States)

    Ollus, Martin; Jansson, Kim; Karvonen, Iris; Uoti, Mikko; Riikonen, Heli

    This paper presents an approach for collaborative project management. The focus is on the support of collaboration, communication and trust. Several project management tools exist for monitoring and control the performance of project tasks. However, support of important intangible assets is more difficult to find. In the paper a leadership approach is identified as a management means and the use of new IT technology, especially social media for support of leadership in project management is discussed.

  1. Construction quality assurance program plan for the WIPP project, Carlsbad, NM

    International Nuclear Information System (INIS)

    1987-05-01

    The purpose of this plan is to describe the Quality Assurance (QA) Program to be established and implemented by the US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Project Office (WPO) and by the Major Project Participants: the Architect-Engineer (Bechtel), the Construction Manager (US Army Corps of Engineers), the Scientific Advisor (Sandia National Laboratory), and the Management and Operating Contractor (Westinghouse Electric Corporation). This plan addresses the construction, including site evaluation, design, and turnover phases of WIPP. Other work in progress during the same period is controlled by DOE documents applicable to that work effort. The prime responsibility for ensuring the quality of construction rests with the DOE WIPP Project Office and is implemented through the combined efforts of the Construction Manager, the Construction Contractors, the Management and Operating Contractor, and the Architect-Engineer. Inspection and burden of proof of acceptability rests with the Construction Contractor as defined by the technical provisions of the contract and as otherwise specified by the DOE WIPP Project Office on an individual work-package basis. To the maximum extent possible, acceptance of work will be based upon first-hand witnessing by the Construction Manager and other representatives of the DOE organization

  2. The NASA Program Management Tool: A New Vision in Business Intelligence

    Science.gov (United States)

    Maluf, David A.; Swanson, Keith; Putz, Peter; Bell, David G.; Gawdiak, Yuri

    2006-01-01

    This paper describes a novel approach to business intelligence and program management for large technology enterprises like the U.S. National Aeronautics and Space Administration (NASA). Two key distinctions of the approach are that 1) standard business documents are the user interface, and 2) a "schema-less" XML database enables flexible integration of technology information for use by both humans and machines in a highly dynamic environment. The implementation utilizes patent-pending NASA software called the NASA Program Management Tool (PMT) and its underlying "schema-less" XML database called Netmark. Initial benefits of PMT include elimination of discrepancies between business documents that use the same information and "paperwork reduction" for program and project management in the form of reducing the effort required to understand standard reporting requirements and to comply with those reporting requirements. We project that the underlying approach to business intelligence will enable significant benefits in the timeliness, integrity and depth of business information available to decision makers on all organizational levels.

  3. 76 FR 56363 - Capital Project Management

    Science.gov (United States)

    2011-09-13

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... current FTA rule for project management oversight into a discrete set of managerial principles for sponsors of major capital projects; enable FTA to more clearly identify the necessary management capacity...

  4. 78 FR 16460 - Capital Project Management

    Science.gov (United States)

    2013-03-15

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... withdrawing its September 13, 2011, Notice of Proposed Rulemaking to revise the agency's project management... will reinitiate a rulemaking for project management oversight in the near future. Additionally, FTA may...

  5. Project Execution Plan, Waste Management Division, Nevada Operations Office, U.S. Department of Energy, April 2000

    International Nuclear Information System (INIS)

    2000-01-01

    This plan addresses project activities encompassed by the U.S. Department of Energy/Nevada Operations Office Waste Management Division and conforms to the requirements contained in the ''Life Cycle Asset Management,'' U.S. Department of Energy Order O430.1A; the Joint Program Office Policy on Project Management in Support of DOE Order O430.1, and the Project Execution and Engineering Management Planning Guide. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the state of Nevada; and traditional project management philosophies such as the development of life cycle costs, schedules, and work scope; identification of roles and responsibilities; and baseline management and controls

  6. Preparing Los Alamos National Laboratory's Waste Management Program for the Future - 12175

    Energy Technology Data Exchange (ETDEWEB)

    Jones, Scotty W.; Dorries, Alison M.; Singledecker, Steven [Los Alamos National Laboratory, PO Box 1663, Los Alamos, NM 87545 (United States); Henckel, George [Los Alamos Site Office, MS-A316, Los Alamos, NM 87544 (United States)

    2012-07-01

    The waste management program at Los Alamos National Laboratory (LANL) is undergoing significant transition to establish a lean highly functioning waste management program that will succeed the large environmental cleanup waste management program. In the coming years, the environmental cleanup activities will be mostly completed and the effort will change to long-term stewardship. What will remain in waste management is a smaller program focused on direct off-site shipping to cost-effectively enable the enduring mission of the laboratory in support of the national nuclear weapons program and fundamental science and research. It is essential that LANL implement a highly functioning efficient waste management program in support of the core missions of the national weapons program and fundamental science and research - and LANL is well on the way to that goal. As LANL continues the transition process, the following concepts have been validated: - Business drivers including the loss of onsite disposal access and completion of major environmental cleanup activities will drive large changes in waste management strategies and program. - A well conceived organizational structure; formal management systems; a customer service attitude; and enthusiastic managers are core to a successful waste management program. - During times of organizational transition, a project management approach to managing change in a complex work place with numerous complex deliverables is successful strategy. - Early and effective engagement with waste generators, especially Project Managers, is critical to successful waste planning. - A well-trained flexible waste management work force is vital. Training plans should include continuous training as a strategy. - A shared fate approach to managing institutional waste decisions, such as the LANL Waste Management Recharge Board is effective. - An efficient WM program benefits greatly from modern technology and innovation in managing waste data and

  7. Management evolution in the LSST project

    Science.gov (United States)

    Sweeney, Donald; Claver, Charles; Jacoby, Suzanne; Kantor, Jeffrey; Krabbendam, Victor; Kurita, Nadine

    2010-07-01

    The Large Synoptic Survey Telescope (LSST) project has evolved from just a few staff members in 2003 to about 100 in 2010; the affiliation of four founding institutions has grown to 32 universities, government laboratories, and industry. The public private collaboration aims to complete the estimated $450 M observatory in the 2017 timeframe. During the design phase of the project from 2003 to the present the management structure has been remarkably stable. At the same time, the funding levels, staffing levels and scientific community participation have grown dramatically. The LSSTC has introduced project controls and tools required to manage the LSST's complex funding model, technical structure and distributed work force. Project controls have been configured to comply with the requirements of federal funding agencies. Some of these tools for risk management, configuration control and resource-loaded schedule have been effective and others have not. Technical tasks associated with building the LSST are distributed into three subsystems: Telescope & Site, Camera, and Data Management. Each sub-system has its own experienced Project Manager and System Scientist. Delegation of authority is enabling and effective; it encourages a strong sense of ownership within the project. At the project level, subsystem management follows the principle that there is one Board of Directors, Director, and Project Manager who have overall authority.

  8. A Conceptual Framework for Adaptive Project Management in the Department of Defense

    Science.gov (United States)

    2016-04-30

    qÜáêíÉÉåíÜ=^ååì~ä= ^Åèìáëáíáçå=oÉëÉ~êÅÜ= póãéçëáìã= qÜìêëÇ~ó=pÉëëáçåë= sçäìãÉ=ff= = A Conceptual Framework for Adaptive Project Management in the Department... Conceptual Framework for Adaptive Project Management in the Department of Defense Martin Brown, Jr., Project Manager, Program Executive Office for...NPS ^Åèìáëáíáçå=oÉëÉ~êÅÜ=mêçÖê~ãW= `êÉ~íáåÖ=póåÉêÖó=Ñçê=fåÑçêãÉÇ=`Ü~åÖÉ= - 503 - A Conceptual Framework for Adaptive Project Management in

  9. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  10. Managing dualities in organizational change projects

    OpenAIRE

    Shaw, David

    2016-01-01

    When managers want to change their organisation they often set up a project to do it, in the belief that doing so simplifies and focuses the change initiative and brings greater assurance of success. Case studies of three organisational change projects undertaken by Arts Council England during 2006-2007 are used to examine the notion of project management and change management as a duality. It is argued that the structured, systematic approach associated with project management needs to be ba...

  11. Adaptation of Agile Project Management Methodology for Project Team

    Directory of Open Access Journals (Sweden)

    Rasnacis Arturs

    2015-12-01

    Full Text Available A project management methodology that defines basic processes, tools, techniques, methods, resources and procedures used to manage a project is necessary for effective and successful IT project management. Each company needs to define its own methodology or adapt some of the existing ones. The purpose of the research is to evaluate the possibilities of adapting IT project development methodology according to the company, company employee characteristics and their mutual relations. The adaptation process will be illustrated with a case study at an IT company in Latvia where the developed methodology is based on Agile Scrum, one of the most widespread Agile methods.

  12. [The research project: financing and management].

    Science.gov (United States)

    Schena, F P

    2003-01-01

    Basic and clinical research is accomplished by projects. The design of a project is not only based on the scientific content but also on its financing and management. This article wants to illustrate the correct modalities for project financing and project management in a scientific project.

  13. Managing water, fish and power : trends in environmental regulation of hydropower projects

    Energy Technology Data Exchange (ETDEWEB)

    Bursey, D.; McLean, J.; Longe, R. [Bull, Housser and Tupper LLP, Vancouver, BC (Canada)

    2009-07-01

    Recent trends in federal legislation related to the environmental impacts of hydroelectric power projects were reviewed. The study focused on a discussion of recent and proposed amendments to the Species at Risk Act, the Fisheries Act, and the Navigable Waters Protection Act. Challenges associated with risk management, the public perception of risk, and the communication of decisions related to the management and protection of aquatic ecosystems were discussed. The Brilliant Expansion Power Project (BRX) examined the interactions with white sturgeon on the Kootenay River in British Columbia (BC). A monitoring program was conducted during the project's construction in order to reduce the risk to sturgeon from blasting. A habitat enhancement feature was also constructed. It was concluded that the mitigation strategies used during the BRX project provide a useful example of innovation and adaptive management. 19 refs.

  14. 76 FR 67400 - Capital Project Management

    Science.gov (United States)

    2011-11-01

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... extending the comment period on its proposed rule for Capital Project Management to December 2, 2011, to...) proposing to transform the current FTA rule for project management oversight into a discrete set of...

  15. EPRI Guide to Managing Nuclear Utility Protective Clothing Programs

    International Nuclear Information System (INIS)

    Kelly, J.J.; Kelly, D.M.

    1993-10-01

    The Electric Power Research Institute (EPRI) commissioned a radioactive waste related project (RP2414-34) in 1989 to produce a guide for developing and managing nuclear plant protective clothing programs. Every nuclear facility must coordinate some type of protective clothing program for its radiation workers to ensure proper and safe protection for the wearer and to maintain control over the spread of contamination. Yet, every nuclear facility has developed its own unique program for managing such clothing. Accordingly, a need existed for a reference guide to assist with standardizing protective clothing programs and in controlling the potentially escalating economics of such programs. The initial Guide to Managing Nuclear Utility Protective Clothing Programs, NP-7309, was published in May 1991. Since that time, a number of utilities have reviewed and/or used the report to enhance their protective clothing programs. Some of these utilities requested that a computer program be developed to assist utilities in evaluating the economics of protective clothing programs consistent with the guidance in NP-7309. The PCEVAL computer code responds to that industry need. This report, the PCEVAL User's Manual, provides detailed instruction on use of the software

  16. HBR guide to project management

    CERN Document Server

    Harvard Business Review

    2013-01-01

    MEET YOUR GOALS—ON TIME AND ON BUDGET. How do you rein in the scope of your project when you’ve got a group of demanding stakeholders breathing down your neck? And map out a schedule everyone can stick to? And motivate team members who have competing demands on their time and attention? Whether you’re managing your first project or just tired of improvising, this guide will give you the tools and confidence you need to define smart goals, meet them, and capture lessons learned so future projects go even more smoothly. The HBR Guide to Project Management will help you: • Build a strong, focused team • Break major objectives into manageable tasks • Create a schedule that keeps all the moving parts under control • Monitor progress toward your goals • Manage stakeholders’ expectations • Wrap up your project and gauge its success

  17. A Project Management Approach to M&A Deals and their Post-Integration Projects : A Case Study

    OpenAIRE

    Habibbeigi, Pooria

    2010-01-01

    Mergers and acquisitions (M&A) projects have long been considered as a strategy for organizational growth and gain of market share. Top management teams of companies take M&As into consideration since it is faster and less costly compare to internal growth and development programs. M&A project has variety of benefits such as growth in market share, increase in shareholder wealth, access to new markets, technological advantages and so on and so forth. Another benefit of such projec...

  18. Risk management in nuclear projects

    International Nuclear Information System (INIS)

    Salles, Claudio J.R.

    2002-01-01

    The risk management will be defined by different aspects: danger or loss possibility, or responsibility for damage. The risk management is one stage of project management. The risk management is a continuous process of planning, identification, quantification, answer and risk control to maximize the success potential of activity. The reduction of risk is part of priority establishment. This work will indicate how introduce this important instrument in the management of nuclear projects. (author)

  19. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  20. Law project of program relative to the management of radioactive materials and wastes; Projet de Loi, de programme relatif a la gestion des matieres et des dechets radioactifs

    Energy Technology Data Exchange (ETDEWEB)

    Villepin, D. de; Breton, T

    2006-03-15

    The law of the 30 December 1991 defined three axis of researches and fixed a the legal aspects of the researches programs management. Based on these researches results a law project has been defined. The first part of the document presents the objectives of the law project and discusses the different articles. The second part is devoted to the text of the law project. (A.L.B.)

  1. National NIF Diagnostic Program Interim Management Plan

    International Nuclear Information System (INIS)

    Warner, B

    2002-01-01

    The National Ignition Facility (NIF) has the mission of supporting Stockpile Stewardship and Basic Science research in high-energy-density plasmas. To execute those missions, the facility must provide diagnostic instrumentation capable of observing and resolving in time events and radiation emissions characteristic of the plasmas of interest. The diagnostic instrumentation must conform to high standards of operability and reliability within the NIF environment. These exacting standards, together with the facility mission of supporting a diverse user base, has led to the need for a central organization charged with delivering diagnostic capability to the NIF. The National NIF Diagnostics Program (NNDP) has been set up under the aegis of the NIF Director to provide that organization authority and accountability to the wide user community for NIF. The funds necessary to perform the work of developing diagnostics for NIF will be allocated from the National NIF Diagnostics Program to the participating laboratories and organizations. The participating laboratories and organizations will design, build, and commission the diagnostics for NIF. Restricted availability of funding has had an adverse impact, unforeseen at the time of the original decision to projectize NIF Core Diagnostics Systems and Cryogenic Target Handing Systems, on the planning and initiation of these efforts. The purpose of this document is to provide an interim project management plan describing the organizational structure and management processes currently in place for NIF Core Diagnostics Systems. Preparation of a Program Execution Plan for NIF Core Diagnostics Systems has been initiated and a current draft is provided as Attachment 1 to this document. The National NIF Diagnostics Program Interim Management Plan provides a summary of primary design criteria and functional requirements, current organizational structure, tracking and reporting procedures, and current planning estimates of project scope

  2. Project management strategies for prototyping breakdowns

    DEFF Research Database (Denmark)

    Granlien, Maren Sander; Pries-Heje, Jan; Baskerville, Richard

    2009-01-01

    , managing the explorative and iterative aspects of prototyping projects is not a trivial task. We examine the managerial challenges in a small scale prototyping project in the Danish healthcare sector where a prototype breakdown and project escalation occurs. From this study we derive a framework...... of strategies for coping with escalation in troubled prototyping projects; the framework is based on project management triangle theory and is useful when considering how to manage prototype breakdown and escalation. All strategies were applied in the project case at different points in time. The strategies led...

  3. 76 FR 30147 - Application of the Energy Planning and Management Program Power Marketing Initiative to the...

    Science.gov (United States)

    2011-05-24

    ... Management Program Power Marketing Initiative to the Boulder Canyon Project AGENCY: Western Area Power.... SUMMARY: The Western Area Power Administration (Western), a Federal power marketing agency of the..., the Energy Management and Planning Program (Program), and the Conformed General Consolidated Power...

  4. PROJECT MANAGEMENT CONSIDERED IN A 2014 PERSPECTIVE

    OpenAIRE

    GRAPA ADELINA-ROXANA; SOARE ALICE-MAGDALENA

    2014-01-01

    Project Management has come of age, yet multiple surveys and reports confirm the fact that the majority of projects are challenged. Given the more demanding and strict financial constraints associated with the current fiscal climate, project management is regarded as a tool that can deliver more with less. The literature on Project Management shows that, in spite of advancement in Project Management processes, tools and systems, project success has not significantly improved. T...

  5. Tank waste remediation system privatization infrastructure program requirements and document management process guide

    International Nuclear Information System (INIS)

    ROOT, R.W.

    1999-01-01

    This guide provides the Tank Waste Remediation System Privatization Infrastructure Program management with processes and requirements to appropriately control information and documents in accordance with the Tank Waste Remediation System Configuration Management Plan (Vann 1998b). This includes documents and information created by the program, as well as non-program generated materials submitted to the project. It provides appropriate approval/control, distribution and filing systems

  6. Case management to reduce cardiovascular disease risk in American Indians and Alaska Natives with diabetes: results from the Special Diabetes Program for Indians Healthy Heart Demonstration Project.

    Science.gov (United States)

    Moore, Kelly; Jiang, Luohua; Manson, Spero M; Beals, Janette; Henderson, William; Pratte, Katherine; Acton, Kelly J; Roubideaux, Yvette

    2014-11-01

    We evaluated cardiovascular disease (CVD) risk factors in American Indians/Alaska Natives (AI/ANs) with diabetes in the Special Diabetes Program for Indians Healthy Heart (SDPI-HH) Demonstration Project. Multidisciplinary teams implemented an intensive case management intervention among 30 health care programs serving 138 tribes. The project recruited 3373 participants, with and without current CVD, between 2006 and 2009. We examined data collected at baseline and 1 year later to determine whether improvements occurred in CVD risk factors and in Framingham coronary heart disease (CHD) risk scores, aspirin use, and smoking status. A1c levels decreased an average of 0.2% (P risk scores also decreased significantly. Aspirin therapy increased significantly, and smoking decreased. Participants with more case management visits had significantly greater reductions in LDL cholesterol and A1c values. SDPI-HH successfully translated an intensive case management intervention. Creative retention strategies and an improved understanding of organizational challenges are needed for future Indian health translational efforts.

  7. Globalization And Knowledge Management In Projects

    Directory of Open Access Journals (Sweden)

    Bubel Dagmara

    2015-06-01

    Full Text Available Knowledge management is a field of management dealing with the use of knowledge, methods, and tools to effectively coordinate complex and unique projects. In accordance with this definition, project knowledge can be treated as a useful resource of information that allows projects to be implemented in compliance with its objectives: time, costs, and quality of results. Knowledge in the activity of an organization, including in the implementation of projects, has for many years been an area of interest to researchers, who confirmed its key importance for building permanent competitive advantages of companies and enterprises. In project management, this issue takes on a new character, as it is transferred to the field of dynamic, time restricted, temporary, and team-implemented projects. The aim of this paper is to present the results of a survey regarding the use of practices of knowledge management in projects in international organizations and to show that the concept of knowledge management in projects is a tool conducive to spreading the process of globalization.

  8. Using the baseline environmental management report (BEMR) to examine alternate program scenarios

    International Nuclear Information System (INIS)

    Kristofferson, K.

    1995-01-01

    The US Department of Energy's (DOE) Office of Environmental Management (EM) released the first Baseline Environmental Management Report (BEMR) in March, 1995. The Congressionally-mandated report provides life-cycle cost estimates, tentative schedules, and projected activities necessary to complete DOE's Environmental Management Program. This ''base case'' estimate is based on current program assumptions and the most likely set of activities. However, since the future course of the Environmental Management Program depends upon a number of fundamental technical and policy choices, alternate program scenarios were developed. These alternate cases show the potential cost impacts of changing assumptions in four key areas: future land use, program funding and scheduling, technology development, and waste management configurations. Several cost and program evaluation tools were developed to support the analysis of these alternate cases. The objective of this paper is to describe the analytical tool kit developed to support the development of the 1995 Baseline Report and to discuss the application of these tools to evaluate alternate program scenarios

  9. Independent management and financial review, Yucca Mountain Project, Nevada. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-15

    The Yucca Mountain Project is one part of the Department of Energy`s Office of Civilian Radioactive Waste Management Program (the Program) which was established by the Nuclear Waste Policy Act of 1982, and as amended in 1987. The Program`s goal is to site the nation`s first geologic repository for the permanent disposal of high-level nuclear waste, in the form of spent fuel rod assemblies, generated by the nuclear power industry and a smaller quantity of Government radioactive waste. The Program, which also encompasses the transportation system and the multipurpose canister system was not the subject of this Report. The subject of this Review was only the Yucca Mountain Project in Nevada. While the Review was directed toward the Yucca Mountain Project rather than the Program as a whole, there are certain elements of the Project which cannot be addressed except through discussion of some Program issues. An example is the Total System Life Cycle Cost addressed in Section 7 of this report. Where Program issues are discussed in this Report, the reader is reminded of the scope limitations of the National Association of Regulatory Utility Commissioners (NARUC) contract to review only the Yucca Mountain Project. The primary scope of the Review was to respond to the specific criteria contained in the NARUC scope of work. In responding to these criteria, the Review Team understood that some interested parties have expressed concern over the requirements of the Nuclear Waste Policy Act relative to the Yucca Mountain Project and the nature of activities currently being carried out by the Department of Energy at the Yucca Mountain Project site. The Review Team has attempted to analyze relevant portions of the Nuclear Waste Policy Act as Amended, but has not conducted a thorough analysis of this legislation that could lead to any specific legal conclusions about all aspects of it.

  10. Project management. A discipline which contributes to project success

    International Nuclear Information System (INIS)

    Hoch, G.

    2008-01-01

    The presentation covers the following topics: description of the Project - a contract was signed between KNPP and European Consortium Kozloduy (ECK) consisting of Framatome ANP GmbH as Leader (63%), Framatome ANP S.A.S. (17%), Atomenergoexport (20%) ; Project management in the modernization of NPP Kozloduy units 5 and 6; Project management process within AREVA NP GmbH; current status

  11. MANAGING INNOVATION PROJECTS USING DISTRIBUTION LOGISTICS

    Directory of Open Access Journals (Sweden)

    Erika Loučanová

    2015-12-01

    Full Text Available A significant part of innovation projects management is the distribution logistics. From the point of view of time and material content, the properly chosen way of distribution is one of many factors for success of the project and innovation creation itself. The paper points out the fundamental basis of innovation management in the stage of its realization referring to the importance of distribution logistics in this part of innovation project management. Distribution logistics in the project management provides comprehensive solutions to efficiency of tangible relocating processes in all connections and mutual relations of project in order to maintain compliance between economy and business when implementing innovations.

  12. Chosen aspects of innovative projects management

    Directory of Open Access Journals (Sweden)

    J. Gawlik

    2010-07-01

    Full Text Available Any company willing to maintain its market position has to search and implement innovative products and services. Integrated development ofenterprise’s innovative activity requests a constant search for new technologies and new organizational forms. Ability of effectivemanagement of innovative projects becomes a crucial issue. The paper presents a characteristic of innovative projects accordingly toOECD standards. Project management concepts based on Project Management Institute (PMI and International Project ManagementAssociation (IPMA procedures have been discussed. Key success factors have been defined, i.e.: obtaining assumed project outcome (range, project implementation conform to planned schedule (deadline, maintaining project costs under a certain limit (budget, quality (are the customers satisfied?, resources (team losses and interpersonal relations. Tables comparing product innovativeness with fields of requested know – how for particular product innovativeness levels have been elaborated. Finally, SCRUM method of adaptive project management aiming at providing possibly optimal outcome has been described.

  13. Managing a project's legacy: implications for organizations and project management

    Science.gov (United States)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  14. Application of Project Portfolio Management

    Science.gov (United States)

    Pankowska, Malgorzata

    The main goal of the chapter is the presentation of the application project portfolio management approach to support development of e-Municipality and public administration information systems. The models of how people publish and utilize information on the web have been transformed continually. Instead of simply viewing on static web pages, users publish their own content through blogs and photo- and video-sharing slides. Analysed in this chapter, ICT (Information Communication Technology) projects for municipalities cover the mixture of the static web pages, e-Government information systems, and Wikis. So, for the management of the ICT projects' mixtures the portfolio project management approach is proposed.

  15. Statement of John H. Anttonen, Project Manager, Basalt Waste Isolation Project, Richland Operations Office, Department of Energy

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    My name is John Anttonen and I am the Project Manager for the Basalt Waste Isolation Project (BWIP) at the Department of Energy Richland Operation Office. The responsibilities of may office are to manage the day-to-day activities of the site suitability investigations of the basalt formations at the Hanford Site, a Department complex that is involved in a variety of national missions, including defense materials production, nuclear energy research, and radioactive waste management. In may prepared comments today I would like to touch upon four specific subject areas relating to the BWIP program and then I would be happy to answer any questions you might have. The topics I will cover are: (1) historical aspects; (2) site specific technical issues and how they will be addressed during site characterization of the basalt site at Hanford; (3) current project status and; (4) institutional interaction. For clarity, I have attached several charts to my statement

  16. Project Management Using Modern Guidance, Navigation and Control Theory

    Science.gov (United States)

    Hill, Terry R.

    2011-01-01

    Implementing guidance, navigation, and control (GN&C) theory principles and applying them to the human element of project management and control is not a new concept. As both the literature on the subject and the real-world applications are neither readily available nor comprehensive with regard to how such principles might be applied, this paper has been written to educate the project manager on the "laws of physics" of his or her project (not to teach a GN&C engineer how to become a project manager) and to provide an intuitive, mathematical explanation as to the control and behavior of projects. This paper will also address how the fundamental principles of modern GN&C were applied to the National Aeronautics and Space Administration's (NASA) Constellation Program (CxP) space suit project, ensuring the project was managed within cost, schedule, and budget. A project that is akin to a physical system can be modeled and managed using the same over arching principles of GN&C that would be used if that project were a complex vehicle, a complex system(s), or complex software with time-varying processes (at times nonlinear) containing multiple data inputs of varying accuracy and a range of operating points. The classic GN&C theory approach could thus be applied to small, well-defined projects; yet when working with larger, multiyear projects necessitating multiple organizational structures, numerous external influences, and a multitude of diverse resources, modern GN&C principles are required to model and manage the project. The fundamental principles of a GN&C system incorporate these basic concepts: State, Behavior, Feedback Control, Navigation, Guidance and Planning Logic systems. The State of a system defines the aspects of the system that can change over time; e.g., position, velocity, acceleration, coordinate-based attitude, and temperature, etc. The Behavior of the system focuses more on what changes are possible within the system; this is denoted in the state

  17. 76 FR 23583 - Application of the Energy Planning and Management Program Power Marketing Initiative to the...

    Science.gov (United States)

    2011-04-27

    ... Management Program Power Marketing Initiative to the Boulder Canyon Project AGENCY: Western Area Power... Area Power Administration (Western), a Federal power marketing agency of the Department of Energy (DOE), will apply the Energy Planning and Management Program (Program) Power Marketing Initiative (PMI), as...

  18. The Little Black Book of Project Management

    CERN Document Server

    Thomsett, Michael C

    2009-01-01

    For nearly twenty years, The Little Black Book of Project Management has provided businesspeople everywhere with a quick and effective introduction to project management tools and methodology. The revised and updated third edition reflects the newest techniques, the latest project management software, as well as the most recent changes to the Project Management Body of Knowledge (PMBOK™). Readers will find invaluable strategies for: • Organizing any project • Choosing the project team • Preparing a budget and sticking to it • Scheduling, flowcharting, and controlling a project • Preparing proj

  19. Analyzing Project Management Maturity Level in Indonesia

    Directory of Open Access Journals (Sweden)

    Eliot Simangunsong

    2013-04-01

    Full Text Available Project management has been generally known and increasingly used by many organizations to gain competitive advantage. In this context, many studies have proposed maturity models to evaluate how project management knowledge has been deployed effectively and efficiently in or- ganization. As a developing country, Indonesia needs many development projects managed by government and private companies in different industries. Here, a study to assess project manage- ment maturity level in Indonesian businesses may bring insight about current business practices, which is important to speed up country development and business sustainability. Adapting the Project Management Maturity Model (ProMMM, a survey instrument has been developed and ap- plied to professionals from Jakarta and surrounding area. The result of analysis shows that con- struction and primary industry have a higher maturity level compare to manufacturing and servic- es. It is to be noted, however, that the level of project management understanding is low across in- dustries. This indicates that more quality project management training or certification is required to improve overall project management knowledge in Indonesia.

  20. Amine Swingbed Payload Project Management

    Science.gov (United States)

    Walsch, Mary; Curley, Su

    2013-01-01

    The International Space Station (ISS) has been designed as a laboratory for demonstrating technologies in a microgravity environment, benefitting exploration programs by reducing the overall risk of implementing such technologies in new spacecraft. At the beginning of fiscal year 2010, the ISS program manager requested that the amine-based, pressure-swing carbon dioxide and humidity absorption technology (designed by Hamilton Sundstrand, baselined for the Orion Multi-Purpose Crew Vehicle, and tested at the Johnson Space Center in relevant environments, including with humans, since 2005) be developed into a payload for ISS Utilization. In addition to evaluating the amine technology in a flight environment before the first launch of the Orion vehicle, the ISS program wanted to determine the capability of the amine technology to remove carbon dioxide from the ISS cabin environment at the metabolic rate of the full 6 ]person crew. Because the amine technology vents the absorbed carbon dioxide and water vapor to space vacuum (open loop), additional hardware needed to be developed to minimize the amount of air and water resources lost overboard. Additionally, the payload system would be launched on two separate Space Shuttle flights, with the heart of the payload-the swingbed unit itself-launching a full year before the remainder of the payload. This paper discusses the project management and challenges of developing the amine swingbed payload in order to accomplish the technology objectives of both the open -loop Orion application as well as the closed-loop ISS application.

  1. 33 CFR 385.24 - Project Management Plans.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  2. Savannah River Site Waste Management Program Plan, FY 1993

    International Nuclear Information System (INIS)

    1993-06-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report on facilities being used to manage wastes, forces acting to change current waste management (WM) systems, and how operations are conducted. This document also reports on plans for the coming fiscal year and projects activities for several years beyond the coming fiscal year to adequately plan for safe handling and disposal of radioactive wastes generated at the Savannah River Site (SRS) and for developing technology for improved management of wastes

  3. Applied software risk management a guide for software project managers

    CERN Document Server

    Pandian, C Ravindranath

    2006-01-01

    Few software projects are completed on time, on budget, and to their original specifications. Focusing on what practitioners need to know about risk in the pursuit of delivering software projects, Applied Software Risk Management: A Guide for Software Project Managers covers key components of the risk management process and the software development process, as well as best practices for software risk identification, risk planning, and risk analysis. Written in a clear and concise manner, this resource presents concepts and practical insight into managing risk. It first covers risk-driven project management, risk management processes, risk attributes, risk identification, and risk analysis. The book continues by examining responses to risk, the tracking and modeling of risks, intelligence gathering, and integrated risk management. It concludes with details on drafting and implementing procedures. A diary of a risk manager provides insight in implementing risk management processes.Bringing together concepts ...

  4. The managing role of the school principal in Mi Compu. Mx program

    Directory of Open Access Journals (Sweden)

    Leonardo David GLASSERMAN MORALES

    2016-07-01

    Full Text Available This study is part of a macro research project, which seeks to identify digital competences developed by students and teachers participating in the program called Mi Compu.Mx in the states of Tabasco, Colima and Sonora, Mexico. This article describes the experience of implementing the program in the state of Sonora reported from the perspective of the principal and the management carried out in the process of educational innovation. The aim of the study was to identify the managing role of the school principal while implementing an innovation program in the context of the state of Sonora, Mexico. The research question was: What is the involvement of the school principal in the implementation of Mi Compu.Mx program in elementary schools in the state of Sonora, Mexico? A qualitative methodology was followed with a case study approach where interviews were conducted with 114 heads of primary level. Key findings revealed that the school principal participates as manager of material resources to fulfill the autonomy of school management and is essential to ensure the necessary conditions for full functioning of innovation projects with technology in the classroom.

  5. Philosophy and overview of the INEL waste management program

    International Nuclear Information System (INIS)

    Gertz, C.P.; Whitsett, J.B.; Hamric, J.P.

    1986-01-01

    The INEL philosophy of ''get the job done; do it right--the first time'' is described as it applies to all phases of waste management activities. In addition, an overview of INEL's waste management programs and projects--low-level waste management operations and technology development; transuranic waste management operations and technology development; high-level waste management operations and technology development; spent fuel storage operations and equipment/technology development; transportation operations, technology development, and prototype cask procurements--are discussed. Emphasis is placed on the application of the INEL philosophy to the successful initiation and continuation of INEL waste management activities

  6. Visualizing project management: models and frameworks for mastering complex systems

    National Research Council Canada - National Science Library

    Forsberg, Kevin; Mooz, Hal; Cotterman, Howard

    2005-01-01

    ...- and beyond that on parameters such as return on investment, market acceptance, or sustainability. Anyone who has lived with the space program, or any other hightech industrial product development, can immediately appreciate this acclaimed book. It addresses and "visualizes" the multidimensional interactions of project management and systems engineering i...

  7. LABCORE post release 1.0 development system project management plan

    International Nuclear Information System (INIS)

    Rich, H.S.

    1994-01-01

    The LABCORE post release 1.0 development system project management plan (SPMP) is the primary planning document governing the development of specific enhancements to the LABCORE project. The mission of the Westinghouse Hanford Company (WHC) laboratories is changing from supporting the 200 Area chemical processing plants for process control, waste management, and effluent monitoring to supporting environmental restoration and regulatory compliance commitments. The LABCORE program was implemented as the key element for meeting the commitments by upgrading the laboratories through the implementation of an Automated Data Processing improvement program in January 1994. Scope for LABCORE release 1.0 consisted of hardware and software implementation required to support a minimum number of analyses (Single-Shell Tank [SST] analysis at 222S Laboratory and Performance Evaluation samples at the Waste Sampling Characterization Facility laboratory) using manual entry of data, and to support routine laboratory functions, common to all laboratories. LABCORE post release 1.0 enhancements will expand the functionality presented to the laboratory. Post release 1.0 enhancements will also address the integration of a database for Analytical Services Program Integration, budgeting, and scheduling offices into LABCORE

  8. A maturation model for project-based organisations – with uncertainty management as an always remaining multi-project management focus

    Directory of Open Access Journals (Sweden)

    Anna Jerbrant

    2014-02-01

    Full Text Available The classical view of multi-project management does not capture its dynamic nature. Present theory falls short in the expositive dimension of how management of project-based companies evolves because of their need to be agile and adaptable to a changing environment. The purpose of this paper is therefore to present a descriptive model that elucidates the maturation processes in a project-based organization as well as to give an enhanced understanding of multi-project management in practice. The maturation model displays how the management of project-based organizations evolves between structuring administration and managing any uncertainty, and emphasizes the importance of active individual actions and situated management actions that haveto be undertaken in order to coordinate, synchronize, and communicate the required knowledge and skills.The outcomes primarily reveal that, although standardized project models are used and considerable resources are spent on effective project portfolio management, how information and communication are executedis essential for the management of project-based organizations. This is particularly true for informal and non-codified communication.

  9. Homogenisation in project management for large German research projects in the Earth system sciences: overcoming the institutional coordination bias

    Science.gov (United States)

    Rauser, Florian; Vamborg, Freja

    2016-04-01

    The interdisciplinary project on High Definition Clouds and Precipitation for advancing climate prediction HD(CP)2 (hdcp2.eu) is an example for the trend in fundamental research in Europe to increasingly focus on large national and international research programs that require strong scientific coordination. The current system has traditionally been host-based: project coordination activities and funding is placed at the host institute of the central lead PI of the project. This approach is simple and has the advantage of strong collaboration between project coordinator and lead PI, while exhibiting a list of strong, inherent disadvantages that are also mentioned in this session's description: no community best practice development, lack of integration between similar projects, inefficient methodology development and usage, and finally poor career development opportunities for the coordinators. Project coordinators often leave the project before it is finalized, leaving some of the fundamentally important closing processes to the PIs. This systematically prevents the creation of professional science management expertise within academia, which leads to an automatic imbalance that hinders the outcome of large research programs to help future funding decisions. Project coordinators in academia often do not work in a professional project office environment that could distribute activities and use professional tools and methods between different projects. Instead, every new project manager has to focus on methodological work anew (communication infrastructure, meetings, reporting), even though the technological needs of large research projects are similar. This decreases the efficiency of the coordination and leads to funding that is effectively misallocated. We propose to challenge this system by creating a permanent, virtual "Centre for Earth System Science Management CESSMA" (cessma.com), and changing the approach from host- based to centre-based. This should

  10. Agile Project Management with Scrum

    CERN Document Server

    Schwaber, Ken

    2009-01-01

    The rules and practices for Scrum-a simple process for managing complex projects-are few, straightforward, and easy to learn. But Scrum's simplicity itself-its lack of prescription-can be disarming, and new practitioners often find themselves reverting to old project management habits and tools and yielding lesser results. In this illuminating series of case studies, Scrum co-creator and evangelist Ken Schwaber identifies the real-world lessons-the successes and failures-culled from his years of experience coaching companies in agile project management. Through them, you'll understand how to

  11. Environmental Management 1995: Progress and plans of the Environmental Management Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-01

    Environmental Management 1995 is the second report prepared in response to the requirements of the National Defense Authorization Act for Fiscal Year l994. The first report, Environmental Management 1994, was published in February 1994. This report is intended to provide a broad overview of the Environmental Management program`s activities in 1994, 1995, and 1996. The first section of this report describes the Department of Energy`s Environmental Management program. This is followed by a closer look at what the program is doing across the country, organized by region to help the reader identify and locate sites of interest. Within each region, details of the largest sites are followed by site summaries reported by State and a summary of activities under the Formerly Utilized Sites Remedial Action Program (FUSRAP) and Uranium Mill Tailings Remedial Action Project (UMTRA). For the purposes of this report, a ``site`` is a Department of Energy installation; a ``facility`` is a building located on a Department of Energy site; and an ``area`` is a geographical area, operable unit, or waste area group of unspecified dimension within a site. Throughout this report, ``year`` refers to the Federal Government`s Fiscal Year, which begins on October 1. For example, Fiscal Year 1995 began on October 1, 1994 and will end on September 30, 1995. Budget totals for Hanford include the Hanford Site and Richland Operations Office. The Idaho National Engineering Laboratory includes the Idaho Chemical Processing Plant and the Idaho Operations Office. The Oak Ridge Reservation budget includes Oak Ridge National Laboratory, the Y-12 Plant, the K-25 Site, Oak Ridge Associated Laboratories, the Oak Ridge Operations Office, and funding for the FUSRAP program.

  12. The NIOSH Radiation Dose Reconstruction Project: managing technical challenges.

    Science.gov (United States)

    Moeller, Matthew P; Townsend, Ronald D; Dooley, David A

    2008-07-01

    Approximately two years after promulgation of the Energy Employees Occupational Illness Compensation Program Act, the National Institute for Occupational Safety and Health Office of Compensation and Analysis Support selected a contractor team to perform many aspects of the radiation dose reconstruction process. The project scope and schedule necessitated the development of an organization involving a comparatively large number of health physicists. From the initial stages, there were many technical and managerial challenges that required continuous planning, integration, and conflict resolution. This paper identifies those challenges and describes the resolutions and lessons learned. These insights are hopefully useful to managers of similar scientific projects, especially those requiring significant data, technical methods, and calculations. The most complex challenge has been to complete defensible, individualized dose reconstructions that support timely compensation decisions at an acceptable production level. Adherence to applying claimant-favorable and transparent science consistent with the requirements of the Act has been the key to establishing credibility, which is essential to this large and complex project involving tens of thousands of individual stakeholders. The initial challenges included garnering sufficient and capable scientific staff, developing an effective infrastructure, establishing necessary methods and procedures, and integrating activities to ensure consistent, quality products. The continuing challenges include maintaining the project focus on recommending a compensation determination (rather than generating an accurate dose reconstruction), managing the associated very large data and information management challenges, and ensuring quality control and assurance in the presence of an evolving infrastructure. The lessons learned concern project credibility, claimant favorability, project priorities, quality and consistency, and critical

  13. Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

    Science.gov (United States)

    Kennedy, Kriss J.; Toup, Larry; Gill, Tracy; Tri, Terry; Howe, Scott; Smitherman, David

    2011-01-01

    management team that put in place the key multi-center leadership skills and disciplines to enable a successful tiger team approach. Advocacy was established with key stakeholders and NASA Headquarters (HQ) by defining a strategic vision, mission, goals and objectives for the project and team. As a technology-pull testbed capability the HDU project was able to collaborate and leverage the Exploration Technology Development Program (ETDP) and individual NASA center investments which capitalized on their respective center core competencies and skills. This approach enable the leveraging of over $7.5m of value to create an operational habitat demonstration unit 2010 PEM configuration.

  14. MULTIPLE PROJECT MANAGEMENT IN THE CONSTRUCTION INDSUTRY

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2010-06-01

    Full Text Available The field of project management has historically focused on the administration of one project at a time, a focus that is insufficient given the growing need for organizations to manage multiple projects simultaneously. The requirements of Multiple Project Management (MPM involves demands and practices that are different from those of single projects. MPM poses a special need for coordination of shared resources across multiple projects in a way that can maintain the firm’s strategic focus and facilitate effective decision making. The construction industry is noteworthy for its frequent need for the management of multiple projects. This paper offers a review of the last five years of indexed literature related to multiple project management in the construction industry, identifies gaps and suggests promising new avenues of inquiry.

  15. Making Childhood Asthma Management Education Happen in the Community: Translating Health Behavioral Research into Local Program.

    Science.gov (United States)

    Krutzch, Christine B.; And Others

    1987-01-01

    A technology transfer project for getting initial community adoption of childhood asthma management programs is described. The evolution of the project, including development of programs, packaging considerations, establishment of partnerships, implementation, and evaluation are discussed. (Author/CH)

  16. Computer-integrated design and information management for nuclear projects

    International Nuclear Information System (INIS)

    Gonzalez, A.; Martin-Guirado, L.; Nebrera, F.

    1987-01-01

    Over the past seven years, Empresarios Agrupados has been developing a comprehensive, computer-integrated system to perform the majority of the engineering, design, procurement and construction management activities in nuclear, fossil-fired as well as hydro power plant projects. This system, which is already in a production environment, comprises a large number of computer programs and data bases designed using a modular approach. Each software module, dedicated to meeting the needs of a particular design group or project discipline, facilitates the performance of functional tasks characteristic of the power plant engineering process

  17. Apply Lean Thinking in Project Management

    OpenAIRE

    Pham Ngoc, Lan

    2015-01-01

    The purpose of this thesis was to study the effects of Lean Thinking in Project Management and how applying Lean Project Management could enhance the productivity of project work. The study was carried using theoretical research and collecting empirical data from three interviews and one case study at a local company. At the end of the study, the major project management problems at the company were identified and analyzed following Lean Principles. It was also pointed out where there...

  18. Independent management and financial review, Yucca Mountain Project, Nevada. Final report

    International Nuclear Information System (INIS)

    1995-01-01

    The Yucca Mountain Project is one part of the Department of Energy's Office of Civilian Radioactive Waste Management Program (the Program) which was established by the Nuclear Waste Policy Act of 1982, and as amended in 1987. The Program's goal is to site the nation's first geologic repository for the permanent disposal of high-level nuclear waste, in the form of spent fuel rod assemblies, generated by the nuclear power industry and a smaller quantity of Government radioactive waste. The Program, which also encompasses the transportation system and the multipurpose canister system was not the subject of this Report. The subject of this Review was only the Yucca Mountain Project in Nevada. While the Review was directed toward the Yucca Mountain Project rather than the Program as a whole, there are certain elements of the Project which cannot be addressed except through discussion of some Program issues. An example is the Total System Life Cycle Cost addressed in Section 7 of this report. Where Program issues are discussed in this Report, the reader is reminded of the scope limitations of the National Association of Regulatory Utility Commissioners (NARUC) contract to review only the Yucca Mountain Project. The primary scope of the Review was to respond to the specific criteria contained in the NARUC scope of work. In responding to these criteria, the Review Team understood that some interested parties have expressed concern over the requirements of the Nuclear Waste Policy Act relative to the Yucca Mountain Project and the nature of activities currently being carried out by the Department of Energy at the Yucca Mountain Project site. The Review Team has attempted to analyze relevant portions of the Nuclear Waste Policy Act as Amended, but has not conducted a thorough analysis of this legislation that could lead to any specific legal conclusions about all aspects of it

  19. Project management and Enterprise systems

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2006-01-01

    Implementing and Operating integrated Enterprise Systems are a multidimensional effort. It seriously challenges the IT supplier as well as the professional service provider client. The paper discuss these issues in a project management perspective. A framework for supporting project management...

  20. Small Business Management Education. Entrepreneurship Education for Adults-Program Development and Implementation. Final Report.

    Science.gov (United States)

    Minnesota Univ., St. Paul. Dept. of Agricultural Education.

    A project was organized around a series of activities to prepare materials or disseminations for small business management education programs. Activities were as follow: (1) prepare needs assessment procedures for determining the number and types of businesses to be served by a small business management education program; prepare model…

  1. FORMATION OF RESPONSIBILITY AS A BEHAVIORAL SPECIALIST COMPETENCE IN PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Олександр Семенович ПОНОМАРЬОВ

    2016-02-01

    Full Text Available The essence of the phenomenon of responsibility is considered. It plays an important role in the life of man and society. A sense of personal responsibility is essential for professional project management. However, with respect to the standard IPMA behavioral competencies of the specialist does not consider responsibility as a competence. This article explains the need to consider the responsibility of one of the most important behavioral competencies of project management specialists. The paper analyzes the problem of studying the phenomenon of responsibility. Examples of his studies in philosophy, psychology, and pedagogy. The approaches to the formation and development of students' responsibility. Emphasized the lack of an integrated system of education accountability in higher education. Illuminated by the author's practical experience in the formation and development of responsibility in the process of teaching of the discipline "managerial competence". In particular, the standard program is supplemented with important topics of the course on the philosophy of management, psychology, management and culture management. It is shown that the effective formation of responsibility of students is necessary to ensure the integrity of the system of educational process and consistently apply active learning methods. It was stressed that the responsibility is required professionally and socially important personal characteristics of a person. This primarily relates to the project and to the members of his project team. It is proposed to include responsibility in behavioral specialist competencies in project management as one of the most important components.

  2. 14 CFR 91.1017 - Amending program manager's management specifications.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Amending program manager's management... Ownership Operations Program Management § 91.1017 Amending program manager's management specifications. (a... specifications; or (2) The program manager applies for the amendment of any management specifications, and the...

  3. 97 Things Every Project Manager Should Know

    CERN Document Server

    Davis, Barbee

    2009-01-01

    If the projects you manage don't go as smoothly as you'd like, 97 Things Every Project Manager Should Know offers knowledge that's priceless, gained through years of trial and error. This illuminating book contains 97 short and extremely practical tips -- whether you're dealing with software or non-IT projects -- from some of the world's most experienced project managers and software developers. You'll learn how these professionals have dealt with everything from managing teams to handling project stakeholders to runaway meetings and more. While this book highlights software projects, its w

  4. AECL's waste management and decommissioning program

    International Nuclear Information System (INIS)

    Kupferschmidt, W.C.H.

    2006-01-01

    Full text: Canada has developed significant expertise in radioactive waste management since the mid 1940s, when the Canadian nuclear program commenced activities at Chalk River Laboratories (CRL). Atomic Energy of Canada Limited (AECL), created as a Federal Crown Corporation in 1952, continues to manage wastes from these early days, as well as other radioactive wastes produced by Canadian hospitals, universities, industry, and operational wastes from AECL's current programs. AECL is also carrying out decommissioning of nuclear facilities and installations in Canada, predominantly at its own sites in Ontario (CRL, and the Douglas Point and Nuclear Power Demonstration prototype reactors), Manitoba (Whiteshell Laboratories) and Quebec (Gentilly-1 prototype reactor). At the CRL site, several major waste management enabling facilities are being developed to facilitate both the near- and long-term management of radioactive wastes. For example, the Liquid Waste Transfer and Storage Project is underway to recover and process highly radioactive liquid wastes, currently stored in underground tanks that, in some cases, date back to the initial operations of the site. This project will stabilize the wastes and place them in modern, monitored storage for subsequent solidification and disposal. Another initiative, the Fuel Packaging and Storage Project, has been initiated to recover and condition degraded used fuel that is currently stored in below-ground standpipes. The fuel will be then be stored in new facilities based on an adaptation of AECL's proven MACSTOR TM * dry storage system, originally designed for intermediate-term above-ground storage of used CANDU fuel bundles. Other commercial-based development work is underway to improve the storage density of the MACSTOR TM design, and to extend its application to interim storage of used LWR fuels as well as to the storage of intermediate-level radioactive waste arising from upcoming reactor refurbishment activities in Canada

  5. Site quality management of engineering projects

    International Nuclear Information System (INIS)

    Jiang Yiqun

    2008-01-01

    Site quality management of an engineering project of NPIC was introduced in this paper. Requirements on organization and management, interfaces, and management of interior and exterior communication were put forward, by description of quality planning, process management, process monitoring and summarizing for the engineering projects. By the management of personnel, specifications and procedures, and the control of equipment, material and work surroundings, not only the safety is ensured, but also the quality and schedule of the engineering project were guaranteed, and so the expected quality goals were achieved. (author)

  6. SAGA: A project to automate the management of software production systems

    Science.gov (United States)

    Campbell, Roy H.; Laliberte, D.; Render, H.; Sum, R.; Smith, W.; Terwilliger, R.

    1987-01-01

    The Software Automation, Generation and Administration (SAGA) project is investigating the design and construction of practical software engineering environments for developing and maintaining aerospace systems and applications software. The research includes the practical organization of the software lifecycle, configuration management, software requirements specifications, executable specifications, design methodologies, programming, verification, validation and testing, version control, maintenance, the reuse of software, software libraries, documentation, and automated management.

  7. Project management as steppingstone of enterprises

    OpenAIRE

    Andreeva, T.; Petrovska, T.; Tytar, T.

    2011-01-01

    Actual problems of project management in enterprises in order to achieve their goals. The basic members of the organization and implementation of project and the methodology for their implementation. The basic principles of project management are included.

  8. Document Management Projects: implementation guide

    Directory of Open Access Journals (Sweden)

    Beatriz Bagoin Guimarães

    2016-12-01

    Full Text Available Records Management System implementation is a complex process that needs to be executed by a multidisciplinary team and involves components of apparently non-related areas such as archival science, computer engineering, law, project management and human resource management. All of them are crucial and complementary to guarantee a full and functional implementation of a system and a perfect fusion with the connected processes and procedures. The purpose of this work is to provide organizations with a basic guide to Records Management Project implementation beginning with the steps prior to acquiring the system, following with the main project activities and concluding with the post implementation procedures of continuous improvement and system maintenance.

  9. Integrated project management type contracts

    International Nuclear Information System (INIS)

    Heisler, S.I.

    1975-01-01

    The concept of integrated project management represents a single source to which the owner can turn for all project management functions excepting for those relating to outside parties such as site purchase, personnel selection etc. Other functions such as design, procurement, construction management, schedule and cost control, quality assurance/quality control are usually handled by the integrated project manager as the agent of the owner. The arrangement is flexible and the responsibilities can be varied to suit the size and experience of the owner. Past experience in the United States indicates an increase in the trend toward IPM work and it appears that overseas this trend is developing also. (orig./RW) [de

  10. Project Management Life Cycle Models to Improve Management in High-rise Construction

    Science.gov (United States)

    Burmistrov, Andrey; Siniavina, Maria; Iliashenko, Oksana

    2018-03-01

    The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models) based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  11. Project Management Life Cycle Models to Improve Management in High-rise Construction

    Directory of Open Access Journals (Sweden)

    Burmistrov Andrey

    2018-01-01

    Full Text Available The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  12. Program management system manual

    International Nuclear Information System (INIS)

    1989-08-01

    OCRWM has developed a program management system (PMS) to assist in organizing, planning, directing and controlling the Civilian Radioactive Waste Management Program. A well defined management system is necessary because: (1) the Program is a complex technical undertaking with a large number of participants, (2) the disposal and storage facilities to be developed by the Program must be licensed by the Nuclear Regulatory Commission (NRC) and hence are subject to rigorous quality assurance (QA) requirements, (3) the legislation mandating the Program creates a dichotomy between demanding schedules of performance and a requirement for close and continuous consultation and cooperation with external entities, (4) the various elements of the Program must be managed as parts of an integrated waste management system, (5) the Program has an estimated total system life cycle cost of over $30 billion, and (6) the Program has a unique fiduciary responsibility to the owners and generators of the nuclear waste for controlling costs and minimizing the user fees paid into the Nuclear Waste Fund. This PMS Manual is designed and structured to facilitate strong, effective Program management by providing policies and requirements for organizing, planning, directing and controlling the major Program functions

  13. The evolution of the project management

    Directory of Open Access Journals (Sweden)

    Catalin Drob

    2009-12-01

    Full Text Available Project management has appeared and developed based on scientific management theory during the '50s-'60s of the last century. After the 1990s of the last century, we can say that project management has truly become an independent discipline, which has a huge impact on the success or failure of companies which are engaged in major projects.

  14. Making sense of project management

    DEFF Research Database (Denmark)

    Kjærgaard, Annemette; Kautz, Karl; Nielsen, Peter Axel

    2007-01-01

    How can a software company make sense of project management when it becomes involved in software process improvement? In software development most research has an instrumental view of knowledge management thus neglecting what is probably the most important part of knowledge management namely making...... sense of practice by developers and project managers. Through an action case, we study the knowledge management processes in a Danish software company. We analyse the case through the lens of a theoretical framework. The theoretical framework focuses in particular on sensemaking, collective construed...... substantial insight which could not have been achieved through an instrumental perspective on knowledge management....

  15. Human Research Program Science Management: Overview of Research and Development Activities

    Science.gov (United States)

    Charles, John B.

    2007-01-01

    An overview of research and development activities of NASA's Human Research Science Management Program is presented. The topics include: 1) Human Research Program Goals; 2) Elements and Projects within HRP; 3) Development and Maintenance of Priorities; 4) Acquisition and Evaluation of Research and Technology Proposals; and 5) Annual Reviews

  16. Scrum Project Management

    CERN Document Server

    Pries, Kim H

    2010-01-01

    Scrum, which was originally invented solely for software development, can now be applied to all types of projects. This book shows project managers how to implement Scrum by explaining the artifacts, rituals, and roles used. The text provides Scrum planning methods to control project scope and schedule as well as Scrum tracking methods to focus teams on improving throughput and streamlining communications. The authors show how to combine traditional project methods with Scrum and how to adapt the familiar work breakdown structure to create Scrum backlogs and sprints. They also demonstrate how

  17. RISK MANAGEMENT APPROACHES AND PRACTICES IN IT PROJECTS

    Directory of Open Access Journals (Sweden)

    BRANDAS Claudiu

    2012-07-01

    Full Text Available Risk is identified in project management literature as an important factor influencing IT projects success, and it is relevant for both academic and practitionersn#8217; communities. The paper presents the past and current approaches to risk management in IT projects. The objective of this paper is to compare the different approaches and relate them to existing practices. Project management literature and practice have brought different approaches to risk management, and as a result, many projects ended in failure. We present how risk management is considered in the literature, and we compare the main two approaches: the evaluation approach and the management approach. The contingency approach does not consider risk management to be a specific process as it is an embedded process in the other project management processes. Then, we present the main practices in risk management. The methodology applied is based on documentary study review and analysis of the concepts used by the literature. We analyzed the literature published between 1978 and 2011 from the main journals for IT project management and found out that the essence of project management is risk management. The risk management practices have a considerable influence on stakeholdersn#8217; perception of project success. But, regardless of the chosen approach, a standard method for identifying, assessing, and responding to risks should be included in any project as this influences the outcome of the project.

  18. Program Management System manual

    International Nuclear Information System (INIS)

    1986-01-01

    The Program Management System (PMS), as detailed in this manual, consists of all the plans, policies, procedure, systems, and processes that, taken together, serve as a mechanism for managing the various subprograms and program elements in a cohesive, cost-effective manner. The PMS is consistent with the requirements of the Nuclear Waste Policy Act of 1982 and the ''Mission Plan for the Civilian Radioactive Waste Management Program'' (DOE/RW-0005). It is based on, but goes beyond, the Department of Energy (DOE) management policies and procedures applicable to all DOE programs by adapting these directives to the specific needs of the Civilian Radioactive Waste Management program. This PMS Manual describes the hierarchy of plans required to develop and maintain the cost, schedule, and technical baselines at the various organizational levels of the Civilian Radioactive Waste Management Program. It also establishes the management policies and procedures used in the implementation of the Program. These include requirements for internal reports, data, and other information; systems engineering management; regulatory compliance; safety; quality assurance; and institutional affairs. Although expanded versions of many of these plans, policies, and procedures are found in separate documents, they are an integral part of this manual. The PMS provides the basis for the effective management that is needed to ensure that the Civilian Radioactive Waste Management Program fulfills the mandate of the Nuclear Waste Policy Act of 1982. 5 figs., 2 tabs

  19. Reality check in the project management of EU funding

    Science.gov (United States)

    Guo, Chenbo

    2015-04-01

    A talk addressing workload, focuses, impacts and outcomes of project management (hereinafter PM) Two FP7 projects serve as objects for investigation. In the Earth Science sector NACLIM is a large scale collaborative project with 18 partners from North and West Europe. NACLIM aims at investigating and quantifying the predictability of the North Atlantic/Arctic sea surface temperature, sea ice variability and change on seasonal to decadal time scales which have a crucial impact on weather and climate in Europe. PRIMO from Political Science is a global PhD program funded by Marie Curie ITN instrument with 11 partners from Europe, Eurasia and BRICS countries focusing on the rise of regional powers and its impact on international politics at large. Although the two projects are granted by different FP7 funding instruments, stem from different cultural backgrounds and have different goals, the inherent processes and the key focus of the PM are quite alike. Only the operational management is at some point distinguished from one another. From the administrative point of view, understanding of both EU requirements and the country-specific regulations is essential; it also helps us identifying the grey area in order to carry out the projects more efficiently. The talk will focus on our observation of the day-to-day PM flows - primarily the project implementation - with few particular cases: transparency issues, e.g. priority settings of non-research stakeholders including the conflict in the human resources field, End-User integration, gender issues rising up during a monitoring visit and ethical aspects in field research. Through a brief comparison of both projects we summarize a range of dos and don'ts, an "acting instead of reacting" line of action, and the conclusion to a systematic overall management instead of exclusively project controlling. In a nutshell , the talk aims at providing the audience a summary of the observation in management methodologies and toolkits

  20. Organizational structures of companies versus project management effectiveness

    Directory of Open Access Journals (Sweden)

    Joanna Haffer

    2012-12-01

    Full Text Available An organizational structure, indicated as one out of the four main organizational conditions supporting project management, has an essential meaning for project execution. This article, based on the research results, describes different organizational structures of project-orientated enterprises, enumerating their advantages and disadvantages, and reveals the influence of inter-organizational relations on project management effectiveness in enterprises operating in Poland. The results indicate that the more a character of inter-organizational relations is heading towards project structure, the higher project management effectiveness is. In the next sequence the project management processes are supported by strong matrix structures, whereas the worst outcomes are provided by functional structures. Simultaneously, it was concluded that project structures are conducive to high advancement of project management processes, and among them, especially project risk management processes as well as communication, time and cost management processes.

  1. Managing a sensitive project

    International Nuclear Information System (INIS)

    Etcheber, Pascal

    1998-01-01

    A 'sensitive' project needs to be managed differently from a 'normal' project. This statement might seem simple enough. However, it does not seem to be a simple task to prove it in twenty minutes. This paper is an attempt to share with the audience some of the experiences the company had dealing with sensitive projects. It describes what a sensitive project is, though of all people, the 'nuclear' should know. Then the common mistakes are described, that are made in the hoping that some personal experiences are recognised. Finally the company's strategy is shown, how we foster third party support and the main tools to be used. Ultimately, success is ensured by having a sufficient quantity of allies. A sensitive project does not die because it has too many opponents, but because it has too few allies. Finding and helping allies to act is the thrust of our activity. It enables sensitive projects which deserve to succeed to do so, where traditional management fails miserably

  2. Essentials of Project and Systems Engineering Management

    CERN Document Server

    Eisner, Howard S

    2008-01-01

    The Third Edition of Essentials of Project and Systems Engineering Management enables readers to manage the design, development, and engineering of systems effectively and efficiently. The book both defines and describes the essentials of project and systems engineering management and, moreover, shows the critical relationship and interconnection between project management and systems engineering. The author's comprehensive presentation has proven successful in enabling both engineers and project managers to understand their roles, collaborate, and quickly grasp and apply all the basic princip

  3. Agile & Distributed Project Management

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Pries-Heje, Lene

    2011-01-01

    Scrum has gained surprising momentum as an agile IS project management approach. An obvious question is why Scrum is so useful? To answer that question we carried out a longitudinal study of a distributed project using Scrum. We analyzed the data using coding and categorisation and three carefully...... selected theoretical frameworks. Our conclusion in this paper is that Scrum is so useful because it provides effective communication in the form of boundary objects and boundary spanners, it provides effective social integration by building up social team capital, and it provides much needed control...... and coordination mechanisms by allowing both local and global articulation of work in the project. That is why Scrum is especially useful for distributed IS project management and teamwork....

  4. Ranking the Project Management Success Factors for Construction Project in South India

    Science.gov (United States)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  5. 75 FR 19966 - Boulder Canyon Project-Post-2017 Application of the Energy Planning and Management Program Power...

    Science.gov (United States)

    2010-04-16

    ... Application of the Energy Planning and Management Program Power Marketing Initiative AGENCY: Western Area... and Management Program (Program) Power Marketing Initiative (PMI) (10 CFR part 905) to the Boulder... Power Administration (Western), Desert Southwest Region, a Federal power marketing agency of the...

  6. Project network-oriented materials management policy for complex projects

    DEFF Research Database (Denmark)

    Dixit, Vijaya; Srivastava, Rajiv K; Chaudhuri, Atanu

    2015-01-01

    This work devises a materials management policy integrated with project network characteristics of complex projects. It proposes a relative quantitative measure, overall criticality (OC), for prioritisation of items based on penalty incurred due to their non-availability. In complex projects...... managerial tacit knowledge which provides them enough flexibility to provide information in real form. Computed OC values can be used for items prioritisation and as shortage cost coefficient in inventory models. The revised materials management policy was applied to a shipbuilding project. OC values were......, practicing managers find it difficult to measure OC of items because of the subjective factors and intractable nature of penalties involved. However, using their experience, they can linguistically identify the antecedents and relate them to consequent OC. This work adopts Fuzzy Set Theory to capture...

  7. Program management plan for the Molten Salt Reactor Experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-09-01

    The primary mission of the Molten Salt Reactor Experiment (MSRE) Remediation Project is to effectively implement the risk-reduction strategies and technical plans to stabilize and prevent further migration of uranium within the MSRE facility, remove the uranium and fuel salts from the system, and dispose of the fuel and flush salts by storage in appropriate depositories to bring the facility to a surveillance and maintenance condition before decontamination and decommissioning. This Project Management Plan (PMP) for the MSRE Remediation Project details project purpose; technical objectives, milestones, and cost objectives; work plan; work breakdown structure (WBS); schedule; management organization and responsibilities; project management performance measurement planning, and control; conduct of operations; configuration management; environmental, safety, and health compliance; quality assurance; operational readiness reviews; and training

  8. Program management plan for the Molten Salt Reactor Experiment Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-09-01

    The primary mission of the Molten Salt Reactor Experiment (MSRE) Remediation Project is to effectively implement the risk-reduction strategies and technical plans to stabilize and prevent further migration of uranium within the MSRE facility, remove the uranium and fuel salts from the system, and dispose of the fuel and flush salts by storage in appropriate depositories to bring the facility to a surveillance and maintenance condition before decontamination and decommissioning. This Project Management Plan (PMP) for the MSRE Remediation Project details project purpose; technical objectives, milestones, and cost objectives; work plan; work breakdown structure (WBS); schedule; management organization and responsibilities; project management performance measurement planning, and control; conduct of operations; configuration management; environmental, safety, and health compliance; quality assurance; operational readiness reviews; and training.

  9. Federal-aid highways : FHWA has improved its risk management approach, but needs to improve its oversight of project costs.

    Science.gov (United States)

    2009-07-01

    The federal-aid highway program : provides about $33 billion a year to : states for highway projects. The : federal government provides : funding for and oversees this : program, while states largely : choose and manage the projects. : As requested, ...

  10. MODELS AND METHODS OF SAFETY-ORIENTED PROJECT MANAGEMENT OF DEVELOPMENT OF COMPLEX SYSTEMS: METHODOLOGICAL APPROACH

    Directory of Open Access Journals (Sweden)

    Олег Богданович ЗАЧКО

    2016-03-01

    Full Text Available The methods and models of safety-oriented project management of the development of complex systems are proposed resulting from the convergence of existing approaches in project management in contrast to the mechanism of value-oriented management. A cognitive model of safety oriented project management of the development of complex systems is developed, which provides a synergistic effect that is to move the system from the original (pre condition in an optimal one from the viewpoint of life safety - post-project state. The approach of assessment the project complexity is proposed, which consists in taking into account the seasonal component of a time characteristic of life cycles of complex organizational and technical systems with occupancy. This enabled to take into account the seasonal component in simulation models of life cycle of the product operation in complex organizational and technical system, modeling the critical points of operation of systems with occupancy, which forms a new methodology for safety-oriented management of projects, programs and portfolios of projects with the formalization of the elements of complexity.

  11. Final report to the Atomic Energy Control Board on project management capabilities using NAOP as a case study

    International Nuclear Information System (INIS)

    Masters, P.

    1998-01-01

    The purpose of this report is to identify practices of the Atomic Energy Control Board that support or detract from the implementation of collaborative cross-functional project management and to recommend ways and means of increasing the Board's ability to respond to projects. Ontario Hydro's Nuclear Asset Optimization Program (NAOP) and the Board's response to that program form the basis of a case study for the purposes of this report. Issues examined include: Whether the Board follows a logical project management framework when it addresses projects such as the NAOP; where the Board exhibits good practices in addressing project such as the NAOP; and where the Board needs to develop better practices

  12. 300 Area Revitalization Project Management Plan

    International Nuclear Information System (INIS)

    Downey, H. D.

    1999-01-01

    The 300 Area Revitalization Team has been tasked with the responsibility to develop an integrated path forward for the 300 Area, as part of a commitment stemming from the 300 Area Disposition Workshop that was held on March 17, 1998. The integrated path forward that is needed must ensure that budget, schedule, and work scopes are complementary between the Programs that are involved in the 300Area. This Project Management Plan (PMP) defines the roles and responsibilities, and the overall approach, to development of a prioritized schedule for 300 Area activities that will achieve the end-state condition

  13. An Approach for Implementation of Project Management Information Systems

    Science.gov (United States)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  14. Tuberculosis Relief Belt Supporting Project (Tuberculosis Patient Management Project for Poverty Group).

    Science.gov (United States)

    Kim, Jae Kyoung; Jeong, Ina; Lee, Ji Yeon; Kim, Jung Hyun; Han, Ah Yeon; Kim, So Yeon; Joh, Joon Sung

    2018-03-07

    The "Tuberculosis Relief Belt Supporting Project (Tuberculosis Patient Management Project for Poverty Groups)" is a national program for socioeconomically vulnerable tuberculosis (TB) patients. We sought to evaluate the clinical and socioeconomic characteristics of poverty-stricken TB patients, and determined the need for relief. We examined in-patients with TB, who were supported by this project at the National Medical Center from 2014 to 2015. We retrospectively investigated the patients' socioeconomic status, clinical characteristics, and project expenditures. Fifty-eight patients were enrolled. Among 55 patients with known income status, 24 (43.6%) had no income. Most patients (80%) lived alone. A total of 48 patients (82.8%) had more than one underlying disease. More than half of the enrolled patients (30 patients, 51.7%) had smear-positive TB. Cavitary disease was found in 38 patients (65.5%). Among the 38 patients with known resistance status, 19 (50%) had drug-resistant TB. In terms of disease severity, 96.6% of the cases had moderate-to-severe disease. A total of 14 patients (26.4%) died during treatment. Nursing expenses were supported for 12 patients (20.7%), with patient transportation costs reimbursed for 35 patients (60%). In terms of treatment expenses for 31 people (53.4%), 93.5% of them were supported by uninsured benefits. Underlying disease, infectivity, drug resistance, severity, and death occurred frequently in socioeconomically vulnerable patients with TB. Many uninsured treatment costs were not supported by the current government TB programs, and the "Tuberculosis Relief Belt Supporting Project" compensated for these limitations. Copyright©2018. The Korean Academy of Tuberculosis and Respiratory Diseases.

  15. Risk Management and Uncertainty in Infrastructure Projects

    DEFF Research Database (Denmark)

    Harty, Chris; Neerup Themsen, Tim; Tryggestad, Kjell

    2014-01-01

    The assumption that large complex projects should be managed in order to reduce uncertainty and increase predictability is not new. What is relatively new, however, is that uncertainty reduction can and should be obtained through formal risk management approaches. We question both assumptions...... by addressing a more fundamental question about the role of knowledge in current risk management practices. Inquiries into the predominant approaches to risk management in large infrastructure and construction projects reveal their assumptions about knowledge and we discuss the ramifications these have...... for project and construction management. Our argument and claim is that predominant risk management approaches tends to reinforce conventional ideas of project control whilst undermining other notions of value and relevance of built assets and project management process. These approaches fail to consider...

  16. Software project management in a changing world

    CERN Document Server

    Ruhe, Günther

    2014-01-01

    By bringing together various current direc­tions, Software Project Management in a Changing World focuses on how people and organizations can make their processes more change-adaptive. The selected chapters closely correspond to the project management knowledge areas introduced by the Project Management Body of Knowledge, including its extension for managing software projects. The contributions are grouped into four parts, preceded by a general introduction. Part I "Fundamentals" provides in-depth insights into fundamental topics including resource allocation, cost estimation and risk manage

  17. Assessing the added value of education in project management tuition/training

    NARCIS (Netherlands)

    Steven Nijhuis

    2013-01-01

    Paper presented at the CARPE Conference Manchester 2013 Various programs in higher education feel a need to teach project management skills to students. Measuring the effect of education is a challenge especially when focused on behavioral skills. Research on learning gains often turns to the

  18. Managing nuclear projects: a design agency experience in the design-build of waste management facilities in Canada

    International Nuclear Information System (INIS)

    Brewer, R.; Calzolari, L.

    2006-01-01

    Quality Assurance guarantees the quality of a product; it does not guarantee that it is a quality product. As procedures develop to satisfy QA programs and regulatory needs it is necessary to find ways to ensure that procedural management reinforces project management and does not detract from it. CANATOM NPM's experience in bidding for and executing the design or design and construction of nuclear waste management facilities demonstrates how design excellence and innovation can still be achieved while successfully managing the challenge of technical administration. The sourcing of expertise, the intricacies of design definition and the coordinating efforts required in the execution of the projects (one fully completed, the other into its engineering phase) will provide a valuable insight into the role and activities of an engineering company engaged in a 'Design Agency' (DA) role. (author)

  19. Project Management 2027; The Future of Project Management

    NARCIS (Netherlands)

    Drs. A.J.G. Silvius

    2008-01-01

    This paper describes a study into the expected development of the competences op the project manager in the year 2027. The study was performed amongst the members of IPMA-Netherlands during the summer of 2007. In the study the 46 competences of the International Competence Baseline 3 (ICB 3) were

  20. Project Management in Real Time: A Service-Learning Project

    Science.gov (United States)

    Larson, Erik; Drexler, John A., Jr.

    2010-01-01

    This article describes a service-learning assignment for a project management course. It is designed to facilitate hands-on student learning of both the technical and the interpersonal aspects of project management, and it involves student engagement with real customers and real stakeholders in the creation of real events with real outcomes. As…

  1. Project Management Personnel Competencies Evaluation

    Directory of Open Access Journals (Sweden)

    Paul POCATILU

    2006-01-01

    Full Text Available An important factor for the success management of IT projects is the human resource. People involved in the project management process have to be evaluated. In order to do that, same criteria has to be specified. This paper describes some aspects regarding the personnel evaluation.

  2. Project Management Plan for Initial Tank Retrieval Systems, Project W-211

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    1999-01-01

    Project W-211, Initial Tank Retrieval Systems (ITRS), is a fiscal year 1994 Major Systems Acquisition that will provide systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for future processing plants, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. The ITRS scope has been revised to include waste retrieval systems for tanks AP-102, AP-104, AP-108, AN-103, AN-104, AN-105, AY-102, AZ-102, and SY-102. This current tank selection and sequence provides retrieval systems supporting the Privatized waste processing plant and sustains the ability to provide final remediation of several watch list DSTs via treatment. The ITRS is configured to support changing program needs, as constrained by available budget, by maintaining the flexibility for exchanging tanks requiring mixer pump-based retrieval systems and shifting the retrieval sequence. Preliminary design was configured such that an adequate basis exists for initiating Title II design of a mixer pump based retrieval system for any DST. This Project Management Plan (PMP) documents the methodology for managing the ITRS, formalizes organizational responsibilities and interfaces, and identifies project requirements such as change control, design verification, systems engineering, and human factors engineering

  3. Open Source Approach to Project Management Tools

    Directory of Open Access Journals (Sweden)

    Romeo MARGEA

    2011-01-01

    Full Text Available Managing large projects involving different groups of people and complex tasks can be challenging. The solution is to use Project management software, which allows a more efficient management of projects. However, famous project management systems can be costly and may require expensive custom servers. Even if free software is not as complex as Microsoft Project, is noteworthy to think that not all projects need all the features, amenities and power of such systems. There are free and open source software alternatives that meet the needs of most projects, and that allow Web access based on different platforms and locations. A starting stage in adopting an OSS in-house is finding and identifying existing open source solution. In this paper we present an overview of Open Source Project Management Software (OSPMS based on articles, reviews, books and developers’ web sites, about those that seem to be the most popular software in this category.

  4. Reflexive project management in high-abition projects

    NARCIS (Netherlands)

    Loeber, Anne; Vermeulen, T.

    2016-01-01

    Purpose
    The Aristotelian notion of phronèsis inspired innovative work in the realm of project management as well as in literature on sustainability and societal transformations. We argue that both literatures may benefit from a dialogue between the two, especially in view of outlining project

  5. Environmental Management 1995: Progress and plans of the Environmental Management Program

    International Nuclear Information System (INIS)

    1995-02-01

    Environmental Management 1995 is the second report prepared in response to the requirements of the National Defense Authorization Act for Fiscal Year l994. The first report, Environmental Management 1994, was published in February 1994. This report is intended to provide a broad overview of the Environmental Management program's activities in 1994, 1995, and 1996. The first section of this report describes the Department of Energy's Environmental Management program. This is followed by a closer look at what the program is doing across the country, organized by region to help the reader identify and locate sites of interest. Within each region, details of the largest sites are followed by site summaries reported by State and a summary of activities under the Formerly Utilized Sites Remedial Action Program (FUSRAP) and Uranium Mill Tailings Remedial Action Project (UMTRA). For the purposes of this report, a ''site'' is a Department of Energy installation; a ''facility'' is a building located on a Department of Energy site; and an ''area'' is a geographical area, operable unit, or waste area group of unspecified dimension within a site. Throughout this report, ''year'' refers to the Federal Government's Fiscal Year, which begins on October 1. For example, Fiscal Year 1995 began on October 1, 1994 and will end on September 30, 1995. Budget totals for Hanford include the Hanford Site and Richland Operations Office. The Idaho National Engineering Laboratory includes the Idaho Chemical Processing Plant and the Idaho Operations Office. The Oak Ridge Reservation budget includes Oak Ridge National Laboratory, the Y-12 Plant, the K-25 Site, Oak Ridge Associated Laboratories, the Oak Ridge Operations Office, and funding for the FUSRAP program

  6. Nuclear Materials Stewardship Within the DOE Environmental Management Program

    International Nuclear Information System (INIS)

    Bilyeu, J. D.; Kiess, T. E.; Gates, M. L.

    2002-01-01

    The Department of Energy (DOE) Environmental Management (EM) Program has made significant progress in planning disposition of its excess nuclear materials and has recently completed several noteworthy studies. Since establishment in 1997, the EM Nuclear Material Stewardship Program has developed disposition plans for excess nuclear materials to support facility deactivation. All nuclear materials have been removed from the Miamisburg Environmental Management Project (Mound), and disposition planning is nearing completion for the Fernald Environmental Management Project and the Rocky Flats Environmental Technology Site. Only a few issues remain for materials at the Hanford and Idaho sites. Recent trade studies include the Savannah River Site Canyons Nuclear Materials Identification Study, a Cesium/Strontium Management Alternatives Trade Study, a Liquid Technical Standards Trade Study, an Irradiated Beryllium Reflectors with Tritium study, a Special Performance Assessment Required Trade Study, a Neutron Source Trade Study, and development of discard criteria for uranium. A Small Sites Workshop was also held. Potential and planned future activities include updating the Plutonium-239 storage study, developing additional packaging standards, developing a Nuclear Material Disposition Handbook, determining how to recover or dispose of Pu-244 and U-233, and working with additional sites to define disposition plans for their nuclear materials

  7. Tools for Economic Analysis of Patient Management Interventions in Heart Failure Cost-Effectiveness Model: A Web-based program designed to evaluate the cost-effectiveness of disease management programs in heart failure.

    Science.gov (United States)

    Reed, Shelby D; Neilson, Matthew P; Gardner, Matthew; Li, Yanhong; Briggs, Andrew H; Polsky, Daniel E; Graham, Felicia L; Bowers, Margaret T; Paul, Sara C; Granger, Bradi B; Schulman, Kevin A; Whellan, David J; Riegel, Barbara; Levy, Wayne C

    2015-11-01

    Heart failure disease management programs can influence medical resource use and quality-adjusted survival. Because projecting long-term costs and survival is challenging, a consistent and valid approach to extrapolating short-term outcomes would be valuable. We developed the Tools for Economic Analysis of Patient Management Interventions in Heart Failure Cost-Effectiveness Model, a Web-based simulation tool designed to integrate data on demographic, clinical, and laboratory characteristics; use of evidence-based medications; and costs to generate predicted outcomes. Survival projections are based on a modified Seattle Heart Failure Model. Projections of resource use and quality of life are modeled using relationships with time-varying Seattle Heart Failure Model scores. The model can be used to evaluate parallel-group and single-cohort study designs and hypothetical programs. Simulations consist of 10,000 pairs of virtual cohorts used to generate estimates of resource use, costs, survival, and incremental cost-effectiveness ratios from user inputs. The model demonstrated acceptable internal and external validity in replicating resource use, costs, and survival estimates from 3 clinical trials. Simulations to evaluate the cost-effectiveness of heart failure disease management programs across 3 scenarios demonstrate how the model can be used to design a program in which short-term improvements in functioning and use of evidence-based treatments are sufficient to demonstrate good long-term value to the health care system. The Tools for Economic Analysis of Patient Management Interventions in Heart Failure Cost-Effectiveness Model provides researchers and providers with a tool for conducting long-term cost-effectiveness analyses of disease management programs in heart failure. Copyright © 2015 Elsevier Inc. All rights reserved.

  8. Application of project management methodology in design management of nuclear safety related structure

    International Nuclear Information System (INIS)

    Chen Mao

    2004-01-01

    This paper focuses on the application of project management methodology in the design management of Nuclear Safety Related Structure (NSRS), considering the design management features of its civil construction. Based on the experiences from the management of several projects, the project management triangle is proposed to be used in the management, to well treat the position of design interface in the project management. Some other management methods are also proposed

  9. Project manager attributes influencing project success in the South ...

    African Journals Online (AJOL)

    success criteria for building projects in Ghana and concluded that the “current and ... qualifications, profession, leadership style and project team ... and expectations of project management competence between ... 1.d. Sense of teamwork ...

  10. Program management: The keys to a successful ERWM contract

    International Nuclear Information System (INIS)

    Lenyk, R.G.; Cusack, J.G.

    1995-01-01

    Program management for a large Environmental Restoration and Waste Management (ERWM) task order contract is both a skill and an art. Unlike project management, program management deals with global and political issues, with both client and home organizations, as well as with day-to-day operations. Program management requires up-front planning and nurturing, for no contract matures successfully by itself. This paper identifies the many opportunities presented in the planning and initial implementation of the contract. Potential traps are identified so that they can be recognized and avoided or mitigated. Teaming and subcontracting are also addressed. The authors rely on years of program management experience to explore such questions as the following: Can you have an integrated team? What needs to be done before you sign Your contract? Do you know who your client(s) is(are)? Have you incorporated the relevant, especially any new, procurement strategies? The US Department of Energy-Oak Ridge Operations (DOE-ORO) ERWM Remedial Design Contract with Foster Wheeler Environmental Corporation is used as a model for exploring these topics. This ERWM Program-which focuses on the Oak Ridge National Laboratory, the Y-12 Weapons Plant, and the K-25 Site in Oak Ridge, Tennessee; the Paducah Gaseous Diffusion Plant in Paducah, Kentucky; and the Portsmouth Gaseous Diffusion Plant in Portsmouth, Ohio-is in its fifth year with over 225 task orders. The program has been highly successful and has obtained from DOE outstanding marks for achieving quality, responsiveness, timeliness, and subcontracting goals

  11. The ComSoc guide to managing telecommunications projects

    CERN Document Server

    Desmond, Celia

    2010-01-01

    "This pocket guide provides an overview of the telecommunications environment as it has evolved over the past few years, illustrating the need for project management, the significance of project success to the companies, and the application of key project management processes within the telecom environment. Topics covered include: scope management, time management, cost management, procurement management, risk management, communications, quality, human resources, and Integration. It offers professionals a brief and accessible guide to managing telecommunication projects in the 21st century"--

  12. Data analysis and management for the Uranium Resource Evaluation Project

    International Nuclear Information System (INIS)

    Kane, V.E.

    1980-01-01

    The Department of Energy has funded a large data collection effort with the purpose of determining the US uranium resources. This Uranium Resource Evaluation (URE) Project required a large data management effort which involved collection, retrieval, processing, display, and analysis of large volumes of data. Many of the characteristics of this data processing system are relevant to other applications, particularly where routine processing involves analyses for input into numerous technical reports. The URE Project computing system has a modular program structure which has enabled a straightforward interface with both special and general graphics and analysis packages such as SAS, BMDP, and SURFACE II. Other topics include cost-effective computing, data quality, report quality computer output, and test versus production program development

  13. Project Management Plan for Material Stabilization

    International Nuclear Information System (INIS)

    SPEER, D.R.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617/Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides

  14. Project management for economical nuclear energy

    International Nuclear Information System (INIS)

    Majerle, P.P.

    2005-01-01

    The price of electricity is significantly influenced by the cost of the initial generation asset. The cost of the initial nuclear generation asset is significantly influenced by the design and construction duration. Negative variations in the cost and duration of actual design and construction have historically impacted the early relative economics of nuclear power generation. Successful management of plant design information will mitigate the risks of the design and construction of future nuclear plants. Information management tools that can model the integrated delivery of large complex projects enable the project owners to accurately evaluate project progress, as well as the economic impact of regulatory, political, or market activities not anticipated in the project execution plan. Significant differences exist in the electrical energy markets, project delivery models, and fuel availability between continents and countries. However, each market and project delivery model is challenged by the need to produce economical electrical energy. The information management system presented in this paper provides a means to capture in a single integrated computerized database the design information developed during plant design, procurement, and construction and to allow this information to be updated and retrieved in real time by all project participants. Utilization of the information management system described herein will enable diverse project teams to rapidly and reliably input, share, and retrieve power plant information, thereby supporting project management's goal to make good on its commitment to the economic promise of tomorrow's nuclear electrical power generation by achieving cost-effective construction. (authors)

  15. The Challenges and Enhancing Opportunities of Global Project Management: Evidence from Chinese and Dutch Cross-Cultural Project Management

    OpenAIRE

    Zhang, Ying; Marquis, Christopher G; Filippov, Sergey; Haasnoot, Henk-Jan; van der Steen, Martijn

    2015-01-01

    This study investigates the role of national and organisational culture in day-to-day activities of multinational project teams, specifically focusing on differences between Chinese and Dutch project managers. We rely on fieldwork observation and interviews with representatives from a diverse set of organizations in China and the Netherlands. Analyses focus on the impact of cultural differences on five project management processes – (1) project planning, (2) cost and quality management, (3) r...

  16. Instructional Coding System for Mathematics Program of Studies. MET, A Title IV-C Project.

    Science.gov (United States)

    Fairfax County Public Schools, VA. Dept. of Instructional Services.

    This document is part of the Management for Effective Teaching (MET) support kit, a pilot project designed by the Fairfax County (Virginia) Public Schools to assist elementary school teachers in planning, managing, and implementing the county's Program of Studies (POS). This document provides an alpha-numeric coding system to be used in…

  17. Management of investment-construction projects basing on the matrix of key events

    Directory of Open Access Journals (Sweden)

    Morozenko Andrey Aleksandrovich

    2016-11-01

    Full Text Available The article considers the current problematic issues in the management of investment-construction projects, examines the questions of efficiency increase of construction operations on the basis of the formation of a reflex-adaptive organizational structure. The authors analyzed the necessity of forming a matrix of key events in the investment-construction project (ICP, which will create the optimal structure of the project, basing on the work program for its implementation. For convenience of representing programs of the project implementation in time the authors make recommendations to consolidate the works into separate, economically independent functional blocks. It is proposed to use an algorithm of forming the matrix of an investment-construction project, considering the economic independence of the functional blocks and stages of the ICP implementation. The use of extended network model is justified, which is supplemented by organizational and structural constraints at different stages of the project, highlighting key events fundamentally influencing the further course of the ICP implementation.

  18. Data management for community research projects: A JGOFS case study

    Science.gov (United States)

    Lowry, Roy K.

    1992-01-01

    Since the mid 1980s, much of the marine science research effort in the United Kingdom has been focused into large scale collaborative projects involving public sector laboratories and university departments, termed Community Research Projects. Two of these, the Biogeochemical Ocean Flux Study (BOFS) and the North Sea Project incorporated large scale data collection to underpin multidisciplinary modeling efforts. The challenge of providing project data sets to support the science was met by a small team within the British Oceanographic Data Centre (BODC) operating as a topical data center. The role of the data center was to both work up the data from the ship's sensors and to combine these data with sample measurements into online databases. The working up of the data was achieved by a unique symbiosis between data center staff and project scientists. The project management, programming and data processing skills of the data center were combined with the oceanographic experience of the project communities to develop a system which has produced quality controlled, calibrated data sets from 49 research cruises in 3.5 years of operation. The data center resources required to achieve this were modest and far outweighed by the time liberated in the scientific community by the removal of the data processing burden. Two online project databases have been assembled containing a very high proportion of the data collected. As these are under the control of BODC their long term availability as part of the UK national data archive is assured. The success of the topical data center model for UK Community Research Project data management has been founded upon the strong working relationships forged between the data center and project scientists. These can only be established by frequent personal contact and hence the relatively small size of the UK has been a critical factor. However, projects covering a larger, even international scale could be successfully supported by a

  19. Project management at a university

    Science.gov (United States)

    Eaton, Joel A.

    2006-06-01

    Managing instrumentation projects, large or small, involves a number of common challenges-defining what is needed, desiging a system to provide it, producing it in an economical way, and putting it into service expeditiously. Doing these things in a university environoment provides unique challenges and opportunities not obtaining in the environment of large projects at NASA or national labs. I address this topic from the viewpoint of knowledge of two such projects, the development of OAO-2 at the University of Wisconsin and the relocation of Fairborn Observatory to the Patagonia Mountains in Arizona, as well as my own developemnt of the Tennessee State 2-m Automatic Spectroscopic Telescope. For the university environment, I argue for a more traditional management style that relies on more informal techniques than those used in large-scale projects conducted by big bureaucratic institutions. This style identifies what tasks are really necessary and eliminates as much wasteful overhead as possible. I discuss many of the formalities used in project management, such as formal reviews (PDR, CDR, etc.) and Gantt charts, and propose other ways of acheving the same results more effectively. The university environment acutely requires getting the right people to do the project, both in terms of their individual personalities, motivation, and technical skills but also in terms of their ability to get on with one another. Two critical challenges confronting those doing such projects in universities are 1) keeping the contractors on task (the major challenge to anyone doing project management) and 2) dealing with the purchasing systems in such institutions.

  20. The IT project manager competencies that impact project success – A qualitative research

    Directory of Open Access Journals (Sweden)

    Cíntia Cristina Silva de Araújo

    2015-07-01

    Full Text Available Since there is a lack of studies about the relationship of IT project manager competencies and project success, this paper will address the following research question: Which competencies should IT project managers develop in order to achieve success in IT projects? To answer this question, we conducted a qualitative research with an exploratory approach. To collect data, twelve (12 in-depth interviews were done with Brazilian project managers from different companies from several business sectors. The analysis results pointed out that for our respondents the most needed category of competencies are team management, business domain knowledge,  communication, project management and people skills. As other authors have affirmed, technical skills were considered to be less relevant to project success than interpersonal and intrapersonal competencies.