  1. Management Guidelines for Database Developers' Teams in Software Development Projects

    Science.gov (United States)

    Rusu, Lazar; Lin, Yifeng; Hodosi, Georg

    Worldwide job market for database developers (DBDs) is continually increasing in last several years. In some companies, DBDs are organized as a special team (DBDs team) to support other projects and roles. As a new role, the DBDs team is facing a major problem that there are not any management guidelines for them. The team manager does not know which kinds of tasks should be assigned to this team and what practices should be used during DBDs work. Therefore in this paper we have developed a set of management guidelines, which includes 8 fundamental tasks and 17 practices from software development process, by using two methodologies Capability Maturity Model (CMM) and agile software development in particular Scrum in order to improve the DBDs team work. Moreover the management guidelines developed here has been complemented with practices from authors' experience in this area and has been evaluated in the case of a software company. The management guidelines for DBD teams presented in this paper could be very usefully for other companies too that are using a DBDs team and could contribute towards an increase of the efficiency of these teams in their work on software development projects.

  2. Do we need regional guidelines for breast cancer management in the MENA region? MENA Breast Cancer Guidelines project.

    Science.gov (United States)

    Fayed, Reham; Hamza, Dina; Abdallah, Heba; Kelany, Mohamed; Tahseen, Amira; Aref, Adel T

    2017-01-01

    Breast cancer is the most common cancer among females worldwide in general and in the Middle East and the North African region (MENA region) in particular. Management of breast cancer in the MENA region faces a lot of challenges, which include younger age at presentation, aggressive behaviour, lack of national breast screening programmes and lack of reliable data registries as well as socioeconomic factors. These factors make applying the international guidelines for breast cancer management very challenging. The aim of this project is to explore the need for a regional breast cancer guideline as well as to screen the clinical practice of breast cancer management in the MENA region. Three web-based designed surveys were sent to more than 600 oncologists in the MENA region from the period of August 2013 to October 2014. Full descriptive data and information regarding the application of international breast cancer guidelines were collected. The software was using the IP address to prevent duplication of collected data. Descriptive analysis and results were shown as numbers and percentages. During the period of the survey, 104 oncologists responded, representing around an 11% response rate. The majority of replies came from Egypt (59 responses (59%)), followed by Saudi Arabia (ten responses (9.6%)). Fifty-one per cent of responders had more than ten years of experience, and further 31.7% had 5-10 years of experience. Seventy-four per cent were working in governmental hospitals, which is our target sector. There was a major defect in having a genetic counsel unit (78.8% declared an absence of this service), presence of a national breast screening programme (55.8% declared an absence of this service), performing sentinel lymph node biopsy (43.3% declared an absence of this service). The need for regional guidelines for the management of breast cancer was agreed upon by 90.6% of responders. There is a clear need to improve the management of breast cancer in the MENA

  3. A quality project to improve compliance with AAP guidelines for inpatient management of neonatal hyperbilirubinemia.

    Science.gov (United States)

    Tartaglia, Kimberly M; Campbell, Jessica; Shaniuk, Paul; McClead, Richard E

    2013-07-01

    The goal of this study was to improve compliance with published guidelines regarding management of neonatal hyperbilirubinemia in infants admitted to a general pediatric hospital ward and to improve support for their breastfeeding mothers. This quality improvement project was conducted by using Plan-Do-Study-Act cycles and statistical process control methods. Study subjects were infants > 35 weeks' gestation admitted for hyperbilirubinemia to the general inpatient ward of a large, freestanding pediatric hospital. We developed and implemented a guideline for the inpatient management of jaundiced neonates, with ongoing feedback given to the faculty on group performance. Outcome measures included monthly compliance scores based on American Academy of Pediatrics (AAP) guidelines for management of neonates > 35 weeks' gestation and the percentage of admitted jaundiced, breastfeeding infants whose mothers received lactation consultation during hospitalization. To determine the AAP compliance score, we reviewed and assigned points to each patient admission for completion of a standard evaluation, avoidance of unnecessary intravenous (IV) fluids and peripheral IV line placement, avoidance of rebound bilirubin checks while in the hospital, and the bilirubin level at discharge. Mean monthly AAP compliance scores increased from 60.5% of total possible points during the baseline period (January 2010-December 2010) to 90.4% during the intervention period (January 2011-December 2011). Lactation consultations increased from 48% during our baseline period to 63% during our early intervention period and to 90% during the last 5 months of our intervention. Length of stay was unchanged during the baseline and intervention periods. Interprofessional collaboration between nurses and physicians combined with a thoughtful campaign to increase awareness of published guidelines were successful in improving the care of infants admitted with unconjugated hyperbilirubinemia.

  4. Guidelines for the development of a Project Data Management Plan (PDMP)

    Science.gov (United States)

    Green, James L.; King, Joseph H.

    1988-01-01

    The purpose of this document is to assist NASA Project personnel in the preparation of their Project Data Management Plans (PDMP) in accordance with NASA Management Instruction (NMI) 8030.3A. In addition, this report summarizes the scope of a PDMP and establishes important aspects that must be addressed for the long term management and archiving of the data from a NASA space flight investigation.

  5. Methodologies of Project Management

    Directory of Open Access Journals (Sweden)

    Wojciech Macek

    2011-07-01

    Full Text Available This paper presents comparison of three most popular project management standardsbelonging to a wider group of models (for example, PMBOK, Prince 2, CMMI, ISO 10006,BS 6079, IPMA Competence Baseline, European Commission Project Cycle ManagementGuidelines. The author discusses methods of project management according to PMBoK,Prince 2 and ISO 10006, some chosen criteria and fields of knowledge, such as generalregulations of standards, project range management, resources management, and processesconnected with risk, systems of project quality management.

  6. Construction project management handbook.

    Science.gov (United States)

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  7. Principles of project management

    Science.gov (United States)

    1982-01-01

    The basic principles of project management as practiced by NASA management personnel are presented. These principles are given as ground rules and guidelines to be used in the performance of research, development, construction or operational assignments.

  8. Project Management

    DEFF Research Database (Denmark)

    Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015.......Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015....

  9. Project Management

    DEFF Research Database (Denmark)

    Pilkington, Alan; Chai, Kah-Hin; Le, Yang

    2015-01-01

    This paper identifies the true coverage of PM theory through a bibliometric analysis of the International Journal of Project Management from 1996-2012. We identify six persistent research themes: project time management, project risk management, programme management, large-scale project management......, project success/failure and practitioner development. These differ from those presented in review and editorial articles in the literature. In addition, topics missing from the PM BOK: knowledge management project-based organization and project portfolio management have become more popular topics...

  10. Workshop presentation: research guidelines for Construction Management

    Directory of Open Access Journals (Sweden)

    Marco Alvise Bragadin

    2013-10-01

    Full Text Available Nowadays the European economic system challenges the construction sector to take part to industrial recovery of western countries. In co-operation with the Construction Production research group of the Tampere University of of research about construction management tools and methods were detected. Research guidelines: 1 Construction management: tools and methods to manage construction projects 2 environmental impact of construction projects 3 construction management and safety 4 project procurement 5 construction management for major public works & complex projects

  11. Country Report Summary: Japan [Project Management in Nuclear Power Plant Construction: Guidelines and Experience

    International Nuclear Information System (INIS)

    2012-01-01

    . Although the conceptual design work may be outsourced, the utilities manage everything else from the infrastructure, the access roads, the supply of utilities to the site (electricity, water, etc.), the site preparation, the general arrangement of the work areas, the interface between contractors, the scheduling of construction activities, at the site, to overseeing the work of all contractors from the safety, quality, scheduling and contractual standpoints. In order to manage and oversee the suppliers' construction works at the site, a considerable number of qualified engineers and inspectors are required. (3) Consequently to the previous two factors, the Japanese electric companies have built nuclear power plants by awarding split-package contracts (the so-called island approach) as well as smaller component contracts. E.g. HEPCO awarded some 150 contracts for the construction of Tomari NPP Unit 3. (4) Given the large number of utilities in Japan, each company built relatively few new nuclear power plants and this has made it difficult to maintain on their own a highly qualified workforce. Fortunately all utilities in Japan have developed and maintained good relationships with one another and willingly share their human resources where the need arises. Salaries and expenditures however continue to be paid by the original employers. This way the host utility can use the borrowed staff for its construction and the lending utility can maintain its qualified engineers for its next construction project.

  12. Severe accident management guidelines

    International Nuclear Information System (INIS)

    Uhle, Jennifer

    2014-01-01

    The events at Fukushima Daiichi have highlighted the importance of Severe Accident Management Guidelines (SAMGs). As the world has learned from the catastrophe and countries are considering changes to their nuclear regulatory programs, the content of SAMGs and their regulatory control are being evaluated. This presentation highlights several factors that are being addressed in the United States as rulemaking is underway pertaining to SAMGs. The question of how to be prepared for the unexpected is discussed with specific insights gleaned from Fukushima. (author)

  13. A benchmarking project on the quality of previous guidelines about the management of malignant pleural effusion from the European Society of Thoracic Surgeons (ESTS) Pleural Diseases Working Group.

    Science.gov (United States)

    Bertolaccini, Luca; Bedetti, Benedetta; Brunelli, Alessandro; Marinova, Katerina; Raveglia, Federico; Rocco, Gaetano; Shargall, Yaron; Solli, Piergiorgio; Varela, Gonzalo; Papagiannopoulos, Kostas; Kuzdzal, Jaroslaw; Massard, Gilbert; Ruffini, Enrico; Falcoz, Pierre-Emmanuel; Martinez-Barenys, Carlos; Opitz, Isabelle; Batirel, Hasan F; Toker, Alper; Scarci, Marco

    2017-08-01

    In the European Society of Thoracic Surgeons (ESTS) survey about management of malignant pleural effusions (MPE), 56% of respondents are not informed of any relevant clinical guidelines and 52%, who are aware of the existence of guidelines, declared that they are in need of updating or revision. The ESTS Pleural Diseases Working Group developed a benchmarking project on quality of previous guidelines on the management of MPE. The Appraisal of Guidelines for Research and Evaluation (AGREE) II instrument was used to assess each guideline. Each item was scored on a 7-point scale. Scores for each domain were calculated. Economic data for the nations which have issued the guidelines were collected from the Organisation for Economic Cooperation and Development health statistics database. Six guidelines fitted the inclusion criteria and were assessed. Five out of 6 guidelines were produced by a multinational collaboration. Observers would recommend only 2 guidelines with minimal modification. Two areas that received the best score were clarity of presentation and scope and purpose (objectives and health questions target population). The applicability of guideline domain had the lowest score. Multivariate analysis demonstrated that clarity of presentation, international guidelines and publication through medical journal were related to improved scores. A strong correlation was observed between the measures of economic status. The quality of guidelines assessed by the AGREE II criteria was found to be extremely variable. Guidelines achieving higher AGREE II scores were more likely to come from the European Union with the direct involvement of scientific societies in their development. It was also recognized that some fundamental unanswered questions remain about the management of MPE. © The Author 2017. Published by Oxford University Press on behalf of the European Association for Cardio-Thoracic Surgery. All rights reserved.

  14. Workshop presentation: research guidelines for Construction Management

    OpenAIRE

    Marco Alvise Bragadin

    2013-01-01

    Nowadays the European economic system challenges the construction sector to take part to industrial recovery of western countries. In co-operation with the Construction Production research group of the Tampere University of of research about construction management tools and methods were detected. Research guidelines: 1) Construction management: tools and methods to manage construction projects 2) environmental impact of construction projects 3) construction management and safety 4) project p...

  15. Guidelines for Home Energy Professionals Project (Brochure)

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2014-03-01

    The Guidelines for Home Energy Professionals is a collaboration between the U.S. Department of Energy (DOE) and a wide range of home energy performance industry professionals. The Guidelines project, managed by the National Renewable Energy Laboratory (NREL) for DOE, addresses the need for a highly-skilled weatherization workforce equipped to complete consistent, high-quality home energy upgrades for single-family homes, multifamily homes, and manufactured housing. In doing so, it helps increase energy efficiency in housing, which can mitigate climate change, one of the major challenges of the 21st century.

  16. Project Management

    DEFF Research Database (Denmark)

    Kampf, Constance

    2009-01-01

    In this video Associate Professor Constance Kampf talks about the importance project management. Not only as a tool in implementation, but also as a way of thinking, and as something that needs to be considered from idea conception......In this video Associate Professor Constance Kampf talks about the importance project management. Not only as a tool in implementation, but also as a way of thinking, and as something that needs to be considered from idea conception...

  17. Sandia software guidelines, Volume 4: Configuration management

    Energy Technology Data Exchange (ETDEWEB)

    1992-06-01

    This volume is one in a series of Sandia Software Guidelines for use in producing quality software within Sandia National Laboratories. This volume is based on the IEEE standard and guide for software configuration management. The basic concepts and detailed guidance on implementation of these concepts are discussed for several software project types. Example planning documents for both projects and organizations are included.

  18. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    : analysis of results of planning the project scope; study of templates of project works’ structures, recommendations for the formation of levels of structure; decomposition of the totality of project work; creating a dictionary of the project work structure; updating the description of the project scope and the project scope management plan. Practical importance. In order to improve the management of the scope of projects in the pharmacy, the components of subprocesses, participants, input and output documents are investigated and the algorithm for managing the project scope is built. It is determined that the starting elements of project scope management are the justification of the initial data, i.e. the project purpose, impacts of the environment and the internal potential of the enterprise in relation to the project implementation (assets of the organizational process. It is recommended to create a structure of project work starting from the analytical research existing at the enterprise or recommended by standards and guidelines on project management approaches to building a hierarchical structure of works, templates of project work structures. It is noted that the created structure of project work should be audited by participants of the project office. According to the results of planning the sequence and duration of operations for managing the scope of works, a precedence diagram of the investigated process is constructed. Value/originality. The developed recommendations regarding the consistency and structure of subprocesses and operations of the project scope management will allow the enterprise to significantly save time for planning the scope of subsequent projects, using the database created in previous periods, statistics on the implementation of the described operations.

  19. Guidelines for Acceptable Project Expenditures

    International Development Research Centre (IDRC) Digital Library (Canada)

    IDRC CRDI

    You should indicate the total cost for ... achieving project objectives or the quality and effects of IDRC-funded activities. You can include ... travel-management processes to handle travel, but the class of travel and per diems must follow IDRC.

  20. Journal of Wildlife Management guidelines

    Science.gov (United States)

    William M. Block; Frank R. Thompson; Dawn Hanseder; Allison Cox; Anna Knipps

    2011-01-01

    These Guidelines apply to all Journal of Wildlife Management (JWM, The Journal) submissions. Publishing a professional manuscript proceeds most smoothly if authors understand the policy, procedures, format, and style of the outlet to which they are submitting a manuscript. These instructions supersede all previous guidelines. Manuscripts that clearly deviate from this...

  1. ORGANIZATIONAL PROJECT MANAGEMENT MATURITY

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2017-11-01

    , and documenting best practices and potential difficulties. Practical implications. For the purposes of the present research, the level of organizational project management maturity of the enterprise in question is evaluated according to the three-level model developed by H. Кеrzner. The conclusion is made that project management maturity of this enterprise corresponds to maturity level 2. Besides, the defined maturity level is specified in more detail along the life cycle phases in order to determine more precisely the position of project management activity of the enterprise within the maturity model. Potential problems (the so-called “bottlenecks” of the enterprise in the field of project management are identified. Based on the results of the analysis, a number of recommendations are suggested for further development of the corporate system of project management at the given enterprise. The results of the research showed that in order to achieve a higher level of maturity, it is necessary to create a project team, organize a project office, and distribute project management functions among the team members, develop a procedure of involving experts with different professional backgrounds into the project implementation, improve the procedure of creating project teams, ensure the accumulation of best practices of project implementation, establish the corporate standard of project management, and improve the strategic planning for project management, project implementation control, managing changes, labour resources and communication. The suggested guidelines are expected to facilitate the achievement of a higher level of maturity. They also envisage the terms of this transition and the responsible executives. Further enhancement of maturity level is achieved by means of performing a set of activities for improving and aligning various project management sub-processes aimed at managing costs, time, quality, and risks. Another important condition of enhancing

  2. Misguided guidelines for managing labor.

    Science.gov (United States)

    Cohen, Wayne R; Friedman, Emanuel A

    2015-06-01

    In a recent review we expressed concerns about new guidelines for the assessment and management of labor recommended jointly by the American Congress of Obstetricians and Gynecologists (ACOG) and the Society for Maternal-Fetal Medicine (SMFM). These guidelines are based heavily on a new concept of how cervical dilatation and fetal descent progress, derived from the work of Zhang et al. In their Viewpoint article they have addressed, but not allayed, the concerns we described in our review. We assert that the dilatation curve promulgated by Zhang et al cannot be reconciled with direct clinical observation. Even if they were correct, however, it still does not follow that the ACOG/SMFM guidelines should recommend replacing the coherent system of identifying and managing labor aberrations described by Friedman. That system is grounded in well-established clinical principles based on decades of use and the objectively documented association of some labor abnormalities with poor fetal and maternal outcomes. Recommendations for new clinical management protocols should require the demonstration of superior outcomes through extensive, preferably prospective, assessment. Using untested guidelines for the management of labor may adversely affect women and children. Even if those guidelines were to reduce the currently excessive cesarean delivery rate, the price of that benefit is likely to be a trade-off in harm to parturients and their offspring. The nature and degree of that harm needs to be documented before considering adoption of the guidelines. Copyright © 2015 Elsevier Inc. All rights reserved.

  3. Total quality management implementation guidelines

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    These Guidelines were designed by the Energy Quality Council to help managers and supervisors in the Department of Energy Complex bring Total Quality Management to their organizations. Because the Department is composed of a rich mixture of diverse organizations, each with its own distinctive culture and quality history, these Guidelines are intended to be adapted by users to meet the particular needs of their organizations. For example, for organizations that are well along on their quality journeys and may already have achieved quality results, these Guidelines will provide a consistent methodology and terminology reference to foster their alignment with the overall Energy quality initiative. For organizations that are just beginning their quality journeys, these Guidelines will serve as a startup manual on quality principles applied in the Energy context.

  4. Guidelines for Automation Project Execution

    OpenAIRE

    Takkinen, Heidi

    2011-01-01

    The purpose of this Master’s thesis was to create instructions for executing an automation project. Sarlin Oy Ab needed directions on how to execute an automation project. Sarlin is starting up a new business area offering total project solutions for customers. Sarlin focuses on small and minor automation projects on domestic markets. The thesis represents issues related to project execution starting from the theory of the project to its kick-off and termination. Site work is one importan...

  5. Lupus nephritis management guidelines compared.

    Science.gov (United States)

    Wilhelmus, Suzanne; Bajema, Ingeborg M; Bertsias, George K; Boumpas, Dimitrios T; Gordon, Caroline; Lightstone, Liz; Tesar, Vladimir; Jayne, David R

    2016-06-01

    In the past years, many (randomized) trials have been performed comparing the treatment strategies for lupus nephritis. In 2012, these data were incorporated in six different guidelines for treating lupus nephritis. These guidelines are European, American and internationally based, with one separate guideline for children. They offer information on different aspects of the management of lupus nephritis including induction and maintenance treatment of the different histological classes, adjunctive treatment, monitoring of the patient, definitions of response and relapse, indications for (repeat) renal biopsy, and additional challenges such as the presence of vascular complications, the pregnant SLE patient, treatment in children and adolescents and considerations about end-stage renal disease and transplantation. In this review, we summarize the guidelines, determine the common ground between them, highlight the differences and discuss recent literature. © The Author 2015. Published by Oxford University Press on behalf of ERA-EDTA. All rights reserved.

  6. Guidelines For Evaluation Of Natural Gas Projects

    International Nuclear Information System (INIS)

    Farag, H.; El Messirie, A.

    2004-01-01

    This paper is objected to give guidelines for natural gas projects appraisal These guidelines are summarized in modeling of natural gas demand forecast and energy pricing policies for different gas consumers mainly in the manufacturing, mining, transport, trade and agriculture sectors. Analysis of the results is made through sensitivity analysis and decision support system ( DSS )

  7. Risk management system in the natural gas distribution of Lima and Callao according guidelines “Recommendations on transmission and distribution practice” and risk management of the PMI Project (2008)

    OpenAIRE

    Luján Ruiz, Roger Orlando

    2014-01-01

    The purpose of this research study is to analyze quantitative operational risk according to the guidelines of the practice recommendation “Recommendations on Transmission and Distribution Practice” , published by The Institution of Gas Engineers of Great Britain and the PMBOK . Chapter 11 , Managing Project Risk . This study was conducted in the Trunk pipeline system operated by Cálidda the Peru - Natural Gas from the City Gate located in Lurín , to Callao Terminal Station . The purpose of th...

  8. 77 FR 13585 - Electricity Subsector Cybersecurity Risk Management Process Guideline

    Science.gov (United States)

    2012-03-07

    ... DEPARTMENT OF ENERGY Electricity Subsector Cybersecurity Risk Management Process Guideline AGENCY... Electricity Subsector Cybersecurity Risk Management Process guideline. The guideline describes a risk... Cybersecurity Risk Management Process Guideline. The primary goal of this guideline is to describe a risk...

  9. Severe accident management guidelines tool

    International Nuclear Information System (INIS)

    Gutierrez Varela, Javier; Tanarro Onrubia, Augustin; Martinez Fanegas, Rafael

    2014-01-01

    Severe Accident is addressed by means of a great number of documents such as guidelines, calculation aids and diagnostic trees. The response methodology often requires the use of several documents at the same time while Technical Support Centre members need to assess the appropriate set of equipment within the adequate mitigation strategies. In order to facilitate the response, TECNATOM has developed SAMG TOOL, initially named GGAS TOOL, which is an easy to use computer program that clearly improves and accelerates the severe accident management. The software is designed with powerful features that allow the users to focus on the decision-making process. Consequently, SAMG TOOL significantly improves the severe accident training, ensuring a better response under a real situation. The software is already installed in several Spanish Nuclear Power Plants and trainees claim that the methodology can be followed easier with it, especially because guidelines, calculation aids, equipment information and strategies availability can be accessed immediately (authors)

  10. Construction project management handbook : September 2009.

    Science.gov (United States)

    2009-09-01

    The purpose of this Handbook is to provide guidelines for use by public transit agencies (Agencies) undertaking substantial construction : projects, either for the first time or with little prior experience with construction project management. It pr...

  11. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    Full Text Available Modern management theory treats all complex tasks and duties like projects and make these projects possible to be managed by a particular organizational-management concept in order to achieve a goal effectively. A large number of jobs and tasks performed in the system of defense or for defense purposes have the characteristics of projects. Project management is both a skill and a science of monitoring human, material, financial, energy and other resources to achieve required objectives within the given limits: deadlines, time, budget, possibility of realization and the satisfaction of the interests of all project participants. Project management is a traditional area of applied (or functional management focused on managing complex and uncertain situations with defined goals. Introduction In conditions of rapid change and high uncertainty, only adaptive organizations survive, i. e. those that are able not only to react quickly to changes but also to proactively take advantage of changes. Development of project management The biggest influence on the development of the area had complex jobs within the engineering profession. In parallel with the traditional approach new approaches began to develop, while the traditional one still remained in use. Contrary to the traditional engineering approach, a dynamic model first developed in order to respond to demands for greater control of costs. Project management Project management is a skill and knowledge of human and material resources to achieve set objectives within prescribed limits: deadlines, time, budget, possibility of realization, and the satisfaction of all participants in the project. In order to realize a project effectively, it is necessary to manage it rationally. Planning and project management A project plan is a document that allows all team members insight on where to go, when to start and when to arrive, what is necessary to be done in order to achieve the project objectives and what

  12. A Knotworking Guideline for Building Projects

    DEFF Research Database (Denmark)

    Rasmussen, Mai; Gade, Anne Nørkjær; Jensen, Rasmus Lund

    2017-01-01

    to collaborate occurs. The Finnish method, Knotworking AEC, emphasizes both collaboration and structure of building projects, which accommodates the lack of collaboration in the practices of the AEC sector. However, the recent development of Knotworking AEC implies a lack of written articles on Knotworking AEC...... experiments were analysed by practice theoretical methods. The result of this research is a Knotworking Guideline for Building Projects indicating both the phases, the participants and the tasks of each phase. The contribution of the resultlies in the conduction of a Knotworking session from both a practical...

  13. Managing Projects for Change: Contextualised Project Management

    Science.gov (United States)

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  14. Project Communications Management

    OpenAIRE

    José C. Santiago-Guevara; Mauricio Rojas-Contreras; Luis A. Esteban-Villamizar

    2013-01-01

    This article presents a review in relation to the object of study: Communications Management as an important factor in the management of projects. The review includes the most relevant and most renowned authors in the field of project management, focusing on telecommunications projects, which lets you define a communications management model.

  15. Managing clinical improvement projects.

    Science.gov (United States)

    Phillips, Joanna; Simmonds, Lorraine

    This paper, the second of a three-part series looking at change management tools, provides a practical guide on how to use common project management principles in practice. Much of the literature on project management focuses on the business arena, with little reference to clinical settings. Identifying this literature and understanding its relevance to managing projects in healthcare can be difficult. This article provides a practical guide to identifying the key principles of good project management and applying these in health settings.

  16. Modern project-management

    CERN Multimedia

    CERN. Geneva

    2003-01-01

    This lecture will focus on the following issues: - The current state of the art in Project Management, especially the integration of Project Management with general management activities, and the integrated view of resources allocation. - Overview of the project life cycle, the phases and the deliverables - Necessity and limits of planning in a research environment - Organizational aspects of the projects the roles of the stakeholders - How to get the resources when they are needed - Risk Management in Projects - Earned value - How to keep a project on track (schedule and budget) - Management of the suppliers - Closing of the project

  17. Project management process.

    Science.gov (United States)

    2007-03-01

    This course provides INDOT staff with foundational knowledge and skills in project management principles and methodologies. INDOTs project management processes provide the tools for interdisciplinary teams to efficiently and effectively deliver pr...

  18. Project management case studies

    CERN Document Server

    Kerzner, Harold R

    2013-01-01

    A new edition of the most popular book of project management case studies, expanded to include more than 100 cases plus a ""super case"" on the Iridium Project Case studies are an important part of project management education and training. This Fourth Edition of Harold Kerzner''s Project Management Case Studies features a number of new cases covering value measurement in project management. Also included is the well-received ""super case,"" which covers all aspects of project management and may be used as a capstone for a course. This new edition:Contains 100-plus case studies drawn from re

  19. Designing Project Management

    NARCIS (Netherlands)

    Heintz, John Linke; Lousberg, L.; Wamelink, J.W.F.; Saari, A.; Huovinen, P.

    2016-01-01

    In this paper we introduce the concept of Designing Project Management. On the basis of our earlier work, we suggest that there is still a gap between what is known from recent project management literature and what project managers can structurally help in the effectiveness of their work. Assuming

  20. MRS project management

    International Nuclear Information System (INIS)

    Doman, J.W.; Vlahakis, J.

    1992-01-01

    Management of projects under the control of the Office of Civilian Radioactive Waste Management within the Department of Energy is subject to overview by a variety of internal and external entities. This paper reports that effective project management often requires balancing of conflicting directions and conflicting agendas of the different entities in order to proceed with implementation of the Monitored Retrievable Storage project

  1. Web Project Management

    OpenAIRE

    Suralkar, Sunita; Joshi, Nilambari; Meshram, B B

    2013-01-01

    This paper describes about the need for Web project management, fundamentals of project management for web projects: what it is, why projects go wrong, and what's different about web projects. We also discuss Cost Estimation Techniques based on Size Metrics. Though Web project development is similar to traditional software development applications, the special characteristics of Web Application development requires adaption of many software engineering approaches or even development of comple...

  2. Project Risk Management

    Science.gov (United States)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  3. Project stakeholder management

    CERN Document Server

    Eskerod, Pernille

    2013-01-01

    Carrying out a project as planned is not a guarantee for success. Projects may fail because project management does not take the requirements, wishes and concerns of stakeholders sufficiently into account. Projects can only be successful though contributions from stakeholders. And in the end, it is the stakeholders that evaluate whether they find that the project is a success. To manage stakeholders effectively, you need to know your stakeholders, their behaviours and attitudes towards the project. In Project Stakeholder Management, the authors give guidance on how to adopt an analytical and s

  4. IT Project Management Metrics

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available Many software and IT projects fail in completing theirs objectives because different causes of which the management of the projects has a high weight. In order to have successfully projects, lessons learned have to be used, historical data to be collected and metrics and indicators have to be computed and used to compare them with past projects and avoid failure to happen. This paper presents some metrics that can be used for the IT project management.

  5. Successful project management

    CERN Document Server

    Young, Trevor L

    2016-01-01

    Successful Project Management, 5th edition, is an essential guide for anyone who wants to improve the success rate of their projects. It will help managers to maintain a balance between the demands of the customer, the project, the team and the organization. Covering the more technical aspects of a project from start to completion it contains practised and tested techniques, covering project conception and start-up, how to manage stake holders, effective risk management, project planning and launch and execution. Also including a brand new glossary of key terms, it provides help with evaluating your project as well as practical checklists and templates to ensure success for any ambitious project manager. With over one million copies sold, the hugely popular Creating Success series covers a wide variety of topic, with the latest editions including new chapters such as Tough Conversations and Treating People Right. This indispensable business skills collection is suited to a variety of roles, from someone look...

  6. Earned value project management

    CERN Document Server

    Fleming, Quentin W

    2010-01-01

    Organizations that follow the principles of good Earned Value Management (EVM) create an environment that allows teams to successfully operate and thrive ? even in the face of challenges that could negatively impact their projects. Earned Value Project Management (EVPM) is a methodology used to measure and communicate the real physical progress of a project taking into account the work completed, the time taken and the costs incurred to complete that work. As a result, EVPM allows more educated and effective management decision-making, which helps evaluate and control project risk by measuring project progress in monetary terms. In the first two editions of Earned Value Project Management, Quentin W. Fleming and Joel M. Koppelman provided guidance for project management practitioners already familiar with EVPM, was well as those who were new to the use of this technique. The third edition expanded the information available on of EVPM for medium and smaller projects while still being relevant for larger projec...

  7. Fundamentals of Project Management

    CERN Document Server

    Heagney, Joseph

    2011-01-01

    With sales of more than 160,000 copies, Fundamentals of Project Management has helped generations of project managers navigate the ins and outs of every aspect of this complex discipline. Using a simple step-by-step approach, the book is the perfect introduction to project management tools, techniques, and concepts. Readers will learn how to: ò Develop a mission statement, vision, goals, and objectives ò Plan the project ò Create the work breakdown structure ò Produce a workable schedule ò Understand earned value analysis ò Manage a project team ò Control and evaluate progress at every stage.

  8. Clinical practice guidelines in patient management

    Directory of Open Access Journals (Sweden)

    Santosh Kumar

    2001-01-01

    Full Text Available Efforts have always been made to evolve certain prin-ciples to reduce the variability in the management of patients and make medical care more appropriate. These efforts have become almost a movement since 1980s as evidenced in the development of clinical practice guide-lines in all medical disciplines. This article describes the need for clinical practice guidelines and their de-velopment methods and qualities. Advantages and limi-tations of clinical practice guidelines are enumerated. The salient features of various available clinical prac-tice guidelines in urology are also described.

  9. Guidelines for Management Information Systems in Canadian Health Care Facilities

    Science.gov (United States)

    Thompson, Larry E.

    1987-01-01

    The MIS Guidelines are a comprehensive set of standards for health care facilities for the recording of staffing, financial, workload, patient care and other management information. The Guidelines enable health care facilities to develop management information systems which identify resources, costs and products to more effectively forecast and control costs and utilize resources to their maximum potential as well as provide improved comparability of operations. The MIS Guidelines were produced by the Management Information Systems (MIS) Project, a cooperative effort of the federal and provincial governments, provincial hospital/health associations, under the authority of the Canadian Federal/Provincial Advisory Committee on Institutional and Medical Services. The Guidelines are currently being implemented on a “test” basis in ten health care facilities across Canada and portions integrated in government reporting as finalized.

  10. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project. Backgorund information

    International Nuclear Information System (INIS)

    1992-09-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  11. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  12. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  13. Managing Distributed Software Projects

    DEFF Research Database (Denmark)

    Persson, John Stouby

    Increasingly, software projects are becoming geographically distributed, with limited face-toface interaction between participants. These projects face particular challenges that need careful managerial attention. This PhD study reports on how we can understand and support the management...... of distributed software projects, based on a literature study and a case study. The main emphasis of the literature study was on how to support the management of distributed software projects, but also contributed to an understanding of these projects. The main emphasis of the case study was on how to understand...... the management of distributed software projects, but also contributed to supporting the management of these projects. The literature study integrates what we know about risks and risk-resolution techniques, into a framework for managing risks in distributed contexts. This framework was developed iteratively...

  14. Project management for engineers

    CERN Document Server

    Bennett, Michael J

    2014-01-01

    Project Management for Engineers, as the title suggests, is a direct attempt at addressing the ever-increasing and specific needs for better project management of engineering students, practicing engineers and managers in the industry. It aims not only to present the principles and techniques of Project Management, but also to discuss project management standards, processes and requirements, such as PMBOK, IEEE and PRINCE. Each chapter begins with the basics of the theme being developed at a level understandable to an undergraduate, before more complex topics are introduced at the end of each section that are suitable for graduate students. For the practicing professionals or managers in the industry, the book also provides many real illustrations of practical application of the principles of Project Management. Through a realistic blend of theory and practical examples, as well as an integration of the engineering technical issues with business issues, this book seeks to remove the veil of mystery that has...

  15. Project Management Techniques

    OpenAIRE

    Mihalache Anita; Salagean Liana

    2010-01-01

    Project management is a technique that can aid in the planning, scheduling, and monitoring of complex projects characterized by numerous, non repetitive jobs called activities. Examples of projects that would use project management include: - developing a mass rapid – transit system for a metropolitan area; - organizing the relocation of a corporate headquarters; - planning the production of a concert, film, or play; - developing and marketing a new automobile; - constructing a high – rise of...

  16. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  17. Guidelines for sustainable manure management in Asian livestock production systems. A publication prepared under the framework of the RCA project on Integrated Approach for Improving Livestock Production Using Indigenous Resources and Conserving the Environment

    International Nuclear Information System (INIS)

    2008-05-01

    important to evaluate alternative management strategies on-farm. It was recommended that a consultants meeting on manure management should be held in 2005 to review current manure management practices in the region and to develop guidelines for efficient management of manure in different livestock production systems. It was also recommended that these guidelines be distributed to the groups participating in RAS/5/044 so that they could form the basis for planning manure management work to be conducted during the second phase of the project. To address these recommendations, an experts meeting on 'Development of guidelines for efficient manure management in Asian livestock production systems' was organized and held in Ho Chi Minh City, Vietnam. The meeting was hosted by the Institute of Agricultural Science (IAS) for Southern Vietnam and was held from 5 to 9 December 2005. It was attended by 7 foreign experts and one local expert, and was supported by the Technical Officer (TO) of RAS/5/044. The experts gave presentations on state-of-the-art manure management practices and participated in a field visit to experience first hand some of the current manure management practices in Asia. After in depth discussions about the presentations, taking into account the experiences of the field visit, and identifying the target audience for guidelines of this type, an outline of the guidelines for manure management was developed, including recommended or 'best practice' manure management strategies and an inventory of available materials on the subject. What was clear from the discussions and planning was that there is very little information and few guidelines about manure management for Asian livestock systems. A draft document was prepared during the meeting but because of the lack of information available on manure management in Asia, there was not enough time to complete a final draft of the guidelines at the meeting. H. van der Meer kindly took on the responsibility of editing the

  18. MANAGING MULTICULTURAL PROJECT TEAMS

    Directory of Open Access Journals (Sweden)

    Cezar SCARLAT

    2014-06-01

    Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.

  19. Managing Stress. Project Seed.

    Science.gov (United States)

    Muto, Donna; Wilk, Jan

    One of eight papers from Project Seed, this paper describes a stress management project undertaken with high school sophomores. Managing Stress is described as an interactive workshop that offers young people an opportunity to examine specific areas of stress in their lives and to learn effective ways to deal with them. The program described…

  20. Guidelines for education in energy management

    Directory of Open Access Journals (Sweden)

    Morales, C. M.

    2014-01-01

    Full Text Available Although educating for energy management is nowadays recognized as an important topic, the process of training is far from the ideal. One of the main shortcomings identified in the research is related to procedures selection, aside from the consensus of academic authorities of its inter-disciplinary character. This article aims to highlight the guidelines for education in energy management, as well as to advance the workshops for its implementation. The results of the research are only a part of a Ph D studied completed by the writer. The effectiveness of the proposal was appraised experimentally and subjected to specialists’ valuation. Key words: education in energy management, guidelines, environmental education.

  1. [Essential guidelines for Quality Management System].

    Science.gov (United States)

    Daunizeau, A

    2013-06-01

    The guidelines describe the essential parts of the quality management system to fulfil the requirements of the standard EN ISO 15 189. It includes mainly the organisation, the definition of responsibilities, training of personnel, the document control, the quality control, identification and control of nonconformities, corrective actions, preventive actions and evaluation, as audits and the management review.

  2. Managing Projects with KPRO

    Science.gov (United States)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  3. Standard guidelines for the chromosome-centric human proteome project.

    Science.gov (United States)

    Paik, Young-Ki; Omenn, Gilbert S; Uhlen, Mathias; Hanash, Samir; Marko-Varga, György; Aebersold, Ruedi; Bairoch, Amos; Yamamoto, Tadashi; Legrain, Pierre; Lee, Hyoung-Joo; Na, Keun; Jeong, Seul-Ki; He, Fuchu; Binz, Pierre-Alain; Nishimura, Toshihide; Keown, Paul; Baker, Mark S; Yoo, Jong Shin; Garin, Jerome; Archakov, Alexander; Bergeron, John; Salekdeh, Ghasem Hosseini; Hancock, William S

    2012-04-06

    The objective of the international Chromosome-Centric Human Proteome Project (C-HPP) is to map and annotate all proteins encoded by the genes on each human chromosome. The C-HPP consortium was established to organize a collaborative network among the research teams responsible for protein mapping of individual chromosomes and to identify compelling biological and genetic mechanisms influencing colocated genes and their protein products. The C-HPP aims to foster the development of proteome analysis and integration of the findings from related molecular -omics technology platforms through collaborations among universities, industries, and private research groups. The C-HPP consortium leadership has elicited broad input for standard guidelines to manage these international efforts more efficiently by mobilizing existing resources and collaborative networks. The C-HPP guidelines set out the collaborative consensus of the C-HPP teams, introduce topics associated with experimental approaches, data production, quality control, treatment, and transparency of data, governance of the consortium, and collaborative benefits. A companion approach for the Biology and Disease-Driven HPP (B/D-HPP) component of the Human Proteome Project is currently being organized, building upon the Human Proteome Organization's organ-based and biofluid-based initiatives (www.hupo.org/research). The common application of these guidelines in the participating laboratories is expected to facilitate the goal of a comprehensive analysis of the human proteome.

  4. Project Management Performance Drivers

    OpenAIRE

    Ra’ad, Mohammed A.; Najdawi, Mohammad K.

    2010-01-01

    The practice of project management has gained enormous importance over the past several years in various business industries. “In industries as diverse as pharmaceuticals, software, and aerospace, projects drive business” (Wheatley). This gain of importance can be attributed to the magnitude of the impact project performance results in terms of time, cost, and scope have over the project performing entity. “On the basis of data released by the Bureau of Economic Analysis, part of the US De...

  5. Guidelines for the responsible management of plutonium

    International Nuclear Information System (INIS)

    Agrell, P.H.

    1997-01-01

    Since 1994 an informal group of representatives of States party to the NPT has been trying to develop agreed international guidelines for the responsible management of non-military plutonium. This paper gives a brief description of the outcome. Since the results are still subject to decision by Governments, the description must be in general terms only. The paper describes the background to, and genesis of, the discussions and the general approach taken, which was based on commitment to the NPT, national responsibility for the management of nuclear materials and the fuel cycle, upholding of the IAEA's safeguards system, and a focus on civil material. An indication is given of the development of the Group's thinking, especially the decisions that any guidelines must be capable of accommodating surplus military plutonium, as well as civil, and that the main focus should be on measures to increase transparency. The resulting guidelines are described. Their main features are a re-statement of commitments and standards for the management of non-military plutonium with regard to non-proliferation, safety, and other fields, a commitment to the management of such plutonium according to a consistent national strategy, and a commitment to the publication of information on that strategy, and of annual statistics for holdings of plutonium in a consistent format. Other aspects of the guidelines are also explained. Finally, an attempt is made to assess the possible practical effects of the guidelines if adopted by governments. (author)

  6. The construction project manager in South Africa: Analysis of ...

    African Journals Online (AJOL)

    Journal Home > Vol 22, No 1 (2015) > ... Construction project managers in the built environment come from various backgrounds and knowledge bases; therefore, the project managers' project ... Industry-specific guidelines for construction project management (PMBOK and SACPCMP) were obtained and analysed.

  7. Project Management and the Project Manager: A Strategy for ...

    African Journals Online (AJOL)

    International Journal of Development and Management Review ... collapse, project failure, project abandonment, project cost and time overruns, etc. ... component parts that constitute project management in the building construction industry.

  8. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    OpenAIRE

    Tamara Gvozdenovic; Mirjana Miljanovic; Aleksandar Jegdic; Zeljko Crnogorcic

    2008-01-01

    One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviatio...

  9. Volunteered Geographic Information System Design: Project and Participation Guidelines

    Directory of Open Access Journals (Sweden)

    José-Pablo Gómez-Barrón

    2016-07-01

    Full Text Available This article sets forth the early phases of a methodological proposal for designing and developing Volunteered Geographic Information (VGI initiatives based on a system perspective analysis in which the components depend and interact dynamically among each other. First, it focuses on those characteristics of VGI projects that present different goals and modes of organization, while using a crowdsourcing strategy to manage participants and contributions. Next, a tool is developed in order to design the central crowdsourced processing unit that is best suited for a specific project definition, associating it with a trend towards crowd-based or community-driven approaches. The design is structured around the characterization of different ways of participating, and the task cognitive demand of working on geo-information management, spatial problem solving and ideation, or knowledge acquisition. Then, the crowdsourcing process design helps to identify what kind of participants are needed and outline subsequent engagement strategies. This is based on an analysis of differences among volunteers’ participatory behaviors and the associated set of factors motivating them to contribute, whether on a crowd or community-sourced basis. From a VGI system perspective, this paper presents a set of guidelines and methodological steps in order to align project goals, processes and volunteers and thus successfully attract participation. This methodology helps establish the initial requirements for a VGI system, and, in its current state, it mainly focuses on two components of the system: project and participants.

  10. Organization of project management

    International Nuclear Information System (INIS)

    Schmidt, R.

    1975-01-01

    When speaking about interfaces within a project and their management, one has to understand and define what an interface is. In general, each component facing another one and each person working on a project with another person represents an interface. Therefore a project will consist practically in its entirety of interfaces with components and people sandwiched between them. This paper is limited to the most important interfaces with a focus on the problems occuring at them and their resolution. (orig.) [de

  11. SAGES Guidelines: Prevention and management of gastro ...

    African Journals Online (AJOL)

    SAGES Guidelines: Prevention and management of gastro-oesophageal varices and variceal haemorrhage in cirrhosis. J F Botha. Abstract. No Abstract South African Gastroenterology Review Vol. 6 (1) 2008: pp. 23-25. Full Text: EMAIL FULL TEXT EMAIL FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT.

  12. Adherence to Healthcare Waste Management Guidelines among ...

    African Journals Online (AJOL)

    BACKGROUND: Despite the set guidelines on Healthcare Waste Management in Kenya, mixing of different categories of waste, crude dumping and poor incineration are still a common phenomenon in public health facilities in Thika Subcounty, Kenya. Thika Subcounty generates 560 Kilograms of healthcare waste daily, ...

  13. Physician-centered management guidelines.

    Science.gov (United States)

    Pulde, M F

    1999-01-01

    The "Fortune 500 Most Admired" companies fully understand the irreverent premise "the customer comes second" and that there is a direct correlation between a satisfied work force and productivity, service quality, and, ultimately, organizational success. If health care organizations hope to recruit and retain the quality workforce upon which their core competency depends, they must develop a vision strategic plan, organizational structure, and managerial style that acknowledges the vital and central role of physicians in the delivery of care. This article outlines a conceptual framework for effective physician management, a "critical pathway," that will enable health care organizations to add their name to the list of "most admired." The nine principles described in this article are based on a more respectful and solicitous treatment of physicians and their more central directing role in organizational change. They would permit the transformation of health care into a system that both preserves the virtues of the physician-patient relationship and meets the demand for quality and cost-effectiveness.

  14. Bats and bat habitats : guidelines for wind power projects

    International Nuclear Information System (INIS)

    2010-03-01

    Bat mortality has been documented at wind power projects in a number of habitats across North America. Wind power projects in Ontario have reported annual estimates ranging from 4 to 14 bat mortalities per turbine per year. This document presented guidance on identifying and addressing potential negative effects on bats and bat habitats during the planning, construction, and operation of wind power projects in Ontario. The guidelines supported the Ministry of Environment's renewable energy approval regulation and applied on both Crown and privately-owned land. The document presented the regulatory framework and discussed the assessment process for bats and bat habitats. This process included project site; records review; site investigation; and evaluation of significance. Other topics that were presented included an environmental impact study and an environmental effects monitoring plan such as post construction monitoring and post construction mitigation. Several appendices were also included regarding the potential effects of wind power project on bats; best management practices; methods for evaluating bat wildlife habitat; and post construction monitoring methods. 10 refs., 1 tab., 2 figs., 4 appendices.

  15. Bats and bat habitats : guidelines for wind power projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-03-15

    Bat mortality has been documented at wind power projects in a number of habitats across North America. Wind power projects in Ontario have reported annual estimates ranging from 4 to 14 bat mortalities per turbine per year. This document presented guidance on identifying and addressing potential negative effects on bats and bat habitats during the planning, construction, and operation of wind power projects in Ontario. The guidelines supported the Ministry of Environment's renewable energy approval regulation and applied on both Crown and privately-owned land. The document presented the regulatory framework and discussed the assessment process for bats and bat habitats. This process included project site; records review; site investigation; and evaluation of significance. Other topics that were presented included an environmental impact study and an environmental effects monitoring plan such as post construction monitoring and post construction mitigation. Several appendices were also included regarding the potential effects of wind power project on bats; best management practices; methods for evaluating bat wildlife habitat; and post construction monitoring methods. 10 refs., 1 tab., 2 figs., 4 appendices.

  16. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  17. HERMES project management I

    CERN Multimedia

    CERN. Geneva

    2013-01-01

    A two-hours course on the HERMES Project Management Methodology to the attention of Project Leaders and Project Participants. The methodology is quickly presented; the focus is put on the roles and responsibilities and on the project initiation phase. The course is given in French with slides in English. On April 22nd 2013, a new version of the HERMES methodology was made public. For practical reasons, this course is still given based on the 2009 version of HERMES (a.k.a. HERMES 4).

  18. Scrum Project Management

    CERN Document Server

    Pries, Kim H

    2010-01-01

    Scrum, which was originally invented solely for software development, can now be applied to all types of projects. This book shows project managers how to implement Scrum by explaining the artifacts, rituals, and roles used. The text provides Scrum planning methods to control project scope and schedule as well as Scrum tracking methods to focus teams on improving throughput and streamlining communications. The authors show how to combine traditional project methods with Scrum and how to adapt the familiar work breakdown structure to create Scrum backlogs and sprints. They also demonstrate how

  19. Project management in health informatics.

    Science.gov (United States)

    Ho, Jessica

    2010-01-01

    This chapter gives an educational overview of: * the concept of project management and its role in modern management * the generic project lifecycle process * processes used in developing a plan for the management of resources - time, cost, physical resources and people * the concept of managing risk in projects * communication processes and practices that are important to the management of projects.

  20. [Quality indicators for National Disease Management Guidelines using the example of the National Disease Management Guideline for "Chronic Heart Failure"].

    Science.gov (United States)

    Nothacker, Monika Judith; Langer, Thomas; Weinbrenner, Susanne

    2011-01-01

    Together with an expert committee a structured approach to determining quality indicators for National Disease Management Guidelines has been developed. The key steps of this approach include: introducing guideline authors to the methodology at an early stage of the process of guideline development, pre-selecting recommendations of the guideline which are potentially measurable by means of quality indicators, assessing the potentially measurable quality indicators in written form using five criteria (including their importance for the health care system and clarity of definitions) and approving them in a formal consensus process. For lack of a database these quality indicators must be regarded as preliminary. For the National Disease Management Guideline "Chronic Heart Failure" nine rate-based indicators have been chosen. The indicators correspond to important strong recommendations (grade of recommendation: A) from the fields of diagnosis (two), general therapeutic strategy (two), specific treatment (three), clinical monitoring (one) and co-ordination of care (one). In a second step, the quality indicators have to be validated within a pilot project. The determination and assessment of the potential quality indicators have revealed room for improvement of guideline development. In particular, there is a need for more health care data and for specification of recommendations.

  1. Assessing biocomputational modelling in transforming clinical guidelines for osteoporosis management.

    Science.gov (United States)

    Thiel, Rainer; Viceconti, Marco; Stroetmann, Karl

    2011-01-01

    Biocomputational modelling as developed by the European Virtual Physiological Human (VPH) Initiative is the area of ICT most likely to revolutionise in the longer term the practice of medicine. Using the example of osteoporosis management, a socio-economic assessment framework is presented that captures how the transformation of clinical guidelines through VPH models can be evaluated. Applied to the Osteoporotic Virtual Physiological Human Project, a consequent benefit-cost analysis delivers promising results, both methodologically and substantially.

  2. Agile & Distributed Project Management

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Pries-Heje, Lene

    2011-01-01

    Scrum has gained surprising momentum as an agile IS project management approach. An obvious question is why Scrum is so useful? To answer that question we carried out a longitudinal study of a distributed project using Scrum. We analyzed the data using coding and categorisation and three carefully...... selected theoretical frameworks. Our conclusion in this paper is that Scrum is so useful because it provides effective communication in the form of boundary objects and boundary spanners, it provides effective social integration by building up social team capital, and it provides much needed control...... and coordination mechanisms by allowing both local and global articulation of work in the project. That is why Scrum is especially useful for distributed IS project management and teamwork....

  3. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Tamara Gvozdenovic

    2008-03-01

    Full Text Available One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviations from the previously set quality standards. Basic processes of project quality management are: quality planning, quality assurance and quality control.

  4. Agile Project Portfolio Management

    DEFF Research Database (Denmark)

    Andersen, Jesper Rank; Riis, Jens Ove; Mikkelsen, Hans

    2005-01-01

    This paper will provide a preliminary introduction to the application of Agile Thinking in management of project portfolio and company development. At any point in time, companies have a crowd of development initiatives spread around the organisation and managed at different levels...... in the managerial hierarchy. They compete for resources and managerial attention, and they often take too long time - and some do not survive in the rapid changing context. Top man¬agers ask for speed, flexibility and effectiveness in the portfolio of development activities (projects). But which competencies...

  5. Strategy Guideline: Quality Management in Existing Homes; Cantilever Floor Example

    Energy Technology Data Exchange (ETDEWEB)

    Taggart, J.; Sikora, J.; Wiehagen, J.; Wood, A.

    2011-12-01

    This guideline is designed to highlight the QA process that can be applied to any residential building retrofit activity. The cantilevered floor retrofit detailed in this guideline is included only to provide an actual retrofit example to better illustrate the QA activities being presented. The goal of existing home high performing remodeling quality management systems (HPR-QMS) is to establish practices and processes that can be used throughout any remodeling project. The research presented in this document provides a comparison of a selected retrofit activity as typically done versus that same retrofit activity approached from an integrated high performance remodeling and quality management perspective. It highlights some key quality management tools and approaches that can be adopted incrementally by a high performance remodeler for this or any high performance retrofit. This example is intended as a template and establishes a methodology that can be used to develop a portfolio of high performance remodeling strategies.

  6. Project management: importance for diagnostic laboratories.

    Science.gov (United States)

    Croxatto, A; Greub, G

    2017-07-01

    The need for diagnostic laboratories to improve both quality and productivity alongside personnel shortages incite laboratory managers to constantly optimize laboratory workflows, organization, and technology. These continuous modifications of the laboratories should be conducted using efficient project and change management approaches to maximize the opportunities for successful completion of the project. This review aims at presenting a general overview of project management with an emphasis on selected critical aspects. Conventional project management tools and models, such as HERMES, described in the literature, associated personal experience, and educational courses on management have been used to illustrate this review. This review presents general guidelines of project management and highlights their importance for microbiology diagnostic laboratories. As an example, some critical aspects of project management will be illustrated with a project of automation, as experienced at the laboratories of bacteriology and hygiene of the University Hospital of Lausanne. It is important to define clearly beforehand the objective of a project, its perimeter, its costs, and its time frame including precise duration estimates of each step. Then, a project management plan including explanations and descriptions on how to manage, execute, and control the project is necessary to continuously monitor the progression of a project to achieve its defined goals. Moreover, a thorough risk analysis with contingency and mitigation measures should be performed at each phase of a project to minimize the impact of project failures. The increasing complexities of modern laboratories mean clinical microbiologists must use several management tools including project and change management to improve the outcome of major projects and activities. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  7. Project management tool

    Science.gov (United States)

    Maluf, David A. (Inventor); Bell, David G. (Inventor); Gurram, Mohana M. (Inventor); Gawdiak, Yuri O. (Inventor)

    2009-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as a monthly report, a task plan report, a budget report and a risk management report, are generated and made available for display or further analysis. An extensible database allows searching for information based upon context and upon content.

  8. DOE guidelines for management of radioactive waste - historical perspectives

    International Nuclear Information System (INIS)

    Kluk, A.F.; Neal, R.M.

    1996-01-01

    From the beginning of the Manhattan Project in 1942 through the signing of the Atomic Energy Act (AEA) in 1946 and its reenactment in 1954, new policies and techniques began to evolve for managing waste produced in the manufacture of nuclear weapons. Even in the early days of war-time urgency, public health and safety were the major considerations in managing waste from this new technology. The Atomic Energy Commission (AEC), which took over from the Manhattan Engineer District (MED) in 1947, established initial waste category management guidelines (high level waste stored in tanks, solid low level waste disposed of primarily in trenches, and liquid waste released to ponds, cribs, and pits) based on the management concepts developed by the MED. The AEC and its successor agencies managed radioactive waste in a manner consistent with existing industrial health and safety requirements of that era. With the formation of the Department of Energy (DOE) in September 1977, techniques and internal requirements were already in place or being established that, in some cases, were more protective of human health and the environment than existing legislation and environmental standards. With the transition to environmental cleanup of former DOE weapons production facilities, new and revised guidelines were created to address hazardous and radioactive mixed waste, waste minimization, and recycling. This paper reviews the waste management guidelines as they have evolved from the MED through the resent time

  9. From project management to project leadership

    NARCIS (Netherlands)

    Braun, F.; Avital, M.

    2010-01-01

    It is virtually a truism that good leadership practices can help project managers with attaining the desired project outcome. However, a better understanding of which leadership practices enable project managers to be more effective warrants further investigation. Subsequently, in this study, we

  10. An IS Project Management Course Project

    Science.gov (United States)

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  11. Exploring the Project Portfolio Manager's Role : Between a Data Manager and a Strategic Advisor

    NARCIS (Netherlands)

    Filippov, S.; Van der Weg, R.; Van Ogtrop, F.; Beelen, P.; Mooi, H.

    2014-01-01

    Many companies adopt project portfolio management processes to manage multi-project environments effectively and efficiently. One of the key roles in this process is assigned to the project portfolio manager. This role is formally defined in various guidelines and standards of portfolio management.

  12. SAT project introduction: management issues

    International Nuclear Information System (INIS)

    Kazennov, A.Yu.

    1998-01-01

    Management issues of introducing SAT Project include main objectives and expectations; SAT goal and management; major phases of SAT implementation; project quality assurance; SAT based training system and procedures; role of the project team qualifications

  13. Ensuring effective project management

    International Nuclear Information System (INIS)

    Ward, J.N.

    1980-01-01

    A brief description is given of the organisation methods employed by the Bechtel Power Corporation, in their contract with Mississippi Power and Light Company for the design, construction and procurement activities for the Grand Gulf Nuclear Station. The aim is to ensure effective management, and good communications at all stages of construction, between the project team and the client. (U.K.)

  14. Exploring Project Management Education

    NARCIS (Netherlands)

    Steven Nijhuis

    2017-01-01

    From the article: "The object of this paper is to explore the actual practice in project management education in the Netherlands and compare it to reference institutions and recent literature. A little over 40% of the Higher Education institutions in the Netherlands mentions PM education in

  15. Enhanced project management tool

    Science.gov (United States)

    Hsu, Chen-Jung (Inventor); Patel, Hemil N. (Inventor); Maluf, David A. (Inventor); Moh Hashim, Jairon C. (Inventor); Tran, Khai Peter B. (Inventor)

    2012-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.

  16. 76 FR 57723 - Electricity Sector Cybersecurity Risk Management Process Guideline

    Science.gov (United States)

    2011-09-16

    ... DEPARTMENT OF ENERGY Electricity Sector Cybersecurity Risk Management Process Guideline AGENCY... public comment on DOE's intent to publish the Electricity Sector Cybersecurity Risk Management Process Guideline. The guideline describes a risk management process that is targeted to the specific needs of...

  17. Managing a sensitive project

    International Nuclear Information System (INIS)

    Etcheber, Pascal

    1998-01-01

    A 'sensitive' project needs to be managed differently from a 'normal' project. This statement might seem simple enough. However, it does not seem to be a simple task to prove it in twenty minutes. This paper is an attempt to share with the audience some of the experiences the company had dealing with sensitive projects. It describes what a sensitive project is, though of all people, the 'nuclear' should know. Then the common mistakes are described, that are made in the hoping that some personal experiences are recognised. Finally the company's strategy is shown, how we foster third party support and the main tools to be used. Ultimately, success is ensured by having a sufficient quantity of allies. A sensitive project does not die because it has too many opponents, but because it has too few allies. Finding and helping allies to act is the thrust of our activity. It enables sensitive projects which deserve to succeed to do so, where traditional management fails miserably

  18. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  19. Fadama III Beneficiaries' Adherence to Project Guidelines in Ogun ...

    African Journals Online (AJOL)

    It was recommended that the implementers should keep up their efforts at sensitising beneficiaries on the implementation guidelines of the project, re-work their strategies at addressing procurement and FUEF inadequacies among the beneficiaries and fast-track the delivery of project benefits in the communities. Key words: ...

  20. 2014 UK national guideline for the management of anogenital herpes.

    Science.gov (United States)

    Patel, Raj; Green, John; Clarke, Emily; Seneviratne, Kanchana; Abbt, Naomi; Evans, Ceri; Bickford, Jane; Nicholson, Marian; O'Farrell, Nigel; Barton, Simon; FitzGerald, Mark; Foley, Elizabeth

    2015-10-01

    These guidelines concern the management of anogenital herpes simplex virus infections in adults and give advice on diagnosis, management, and counselling of patients. This guideline replaces the 2007 BASHH herpes guidelines and includes new sections on herpes proctitis, key points to cover with patients regarding transmission and removal of advice on the management of HSV in pregnancy which now has a separate joint BASHH/RCOG guideline. © The Author(s) 2015.

  1. Web Based Project Management System

    OpenAIRE

    Aadamsoo, Anne-Mai

    2010-01-01

    To increase an efficiency of a product, nowadays many web development companies are using different project management systems. A company may run a number of projects at a time, and requires input from a number of individuals, or teams for a multi level development plan, whereby a good project management system is needed. Project management systems represent a rapidly growing technology in IT industry. As the number of users, who utilize project management applications continues to grow, w...

  2. Guidelines to Mainstream Gender in Transport Projects

    OpenAIRE

    Luz Caballero

    2008-01-01

    The consideration of gender in transport is essential to ensure that transport is equitable, affordable, and provides access to resources and opportunities required for development. This note aims to provide guidance for mainstreaming gender into transport projects. It provides examples of how to do this, in relation to the various transport modes used in development operations by the Wor...

  3. Management & Communication: Project Management Case Study

    CERN Multimedia

    Nathalie Dumeaux

    2004-01-01

    We are pleased to announce the recent launch of a new workshop on Project Management. This is designed for People with budgetary, scheduling and/or organizational responsibilities in a project or a sub-project. The objectives through a management case study specially suited to CERN are: to become familiar with modern management techniques in use for structuring, planning, scheduling, costing and progress monitoring of a project or a sub-project. to understand in-depth issues associated with Deliverable-oriented Project Management, Earned Value Management, Advanced Project Cost Engineering and Project Risk Management. The full description of this workshop can be found here. The next session will be held on 8 October 2004. If you are interested in this workshop, please contact Nathalie Dumeaux, email or 78144. Programme of Seminars October to December 2004 Situation : 21.09.2004 Séminaires bilingues Dates Jours Places disponibles Project Management Case study 8 October 1 oui Intr...

  4. Nature conservation guidelines for renewable energy projects

    International Nuclear Information System (INIS)

    1994-01-01

    English Nature commissions this report in order to identify the likely nature conservation implications of renewable energy developments and for wind farm proposals in particular, to give guidance on siting criteria to minimise the nature conservation impact. The report is intended to be of use to developers, local planning authority staff and other interested parties in considering a renewable energy project. In consequence, the report concentrates on planning and nature conservation matters and outlines technical issues where relevant. (UK)

  5. Adherence to ministry of health guidelines in management of severe ...

    African Journals Online (AJOL)

    Background: Guidelines have shown to impact positively on the management of medical conditions. The impact of these guidelines has not been evaluated for severe preeclampsia and eclampsia in Kenya. Objective: To evaluate the level of adherence to Kenya Ministry of Health (MOH) guidelines in the management of ...

  6. 40 CFR 60.35e - Waste management guidelines.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Waste management guidelines. 60.35e... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Hospital/Medical/Infectious Waste Incinerators § 60.35e Waste management guidelines. For approval, a State...

  7. Switchgear project meticulously managed.

    Science.gov (United States)

    Baillie, Jonathan

    2015-04-01

    Electrical engineering and estates personnel at Sodexo--which manages a wide range of soft and hard facilities management services for five hospitals under a PFI contract at the Manchester Royal Infirmary--have successfully planned, managed, and co-ordinated, a complex electrical engineering project which saw high voltage (HV) switchgear in the site's main intake sub-station dismantled by the supplier to repair a potential earthing mechanism fault which would have prevented individual switchgear panels being shut down, to, for example, cater for renovation of electrical cabling or components cross the site's high voltage network. With detailed planning, including provision for bringing onto site temporary bulk generators, and the formulation of a 600-step switching programme, the replacement of potential faulty driver components in the disconnect mechanism for 20 HV switchgear panels was completed in just four weeks, with minimal interruption to the vast complex's power supply.

  8. Interoperability Guidelines for Lithuanian E-Learning Management Systems

    Directory of Open Access Journals (Sweden)

    Eugenijus Kurilovas

    2011-08-01

    Full Text Available Purpose – the paper aims to analyse e-learning content and repositories along with the problems of learning organisation interoperability. The main objective of the paper is to analyse scientific research results and the newest international experience in the area and to provide interoperability guidelines and recommendations for the implementation of appropriate Lithuanian state programmes. The learning content and repositories recommendations are designed for the implementation of the Lithuanian education portal project as well as Lithuanian Virtual University (LVU programme’s information services’ (LABT / eLABa and e-learning services’ (LieDM sub-programmes. The whole education institution recommendations are designed for the maintenance and development of LVU programme’s management services’ (LieMSIS system.Design/methodology/approach – methods used for the general analysis of proposed interoperability guidelines (reccomendations were bibliographic research and comparative analysis of Lithuanian and foreign scientific works published in periodicals and large-scale EU-funded interoperability projects deliverables. System analysis and comparative analysis methods were used in order to formulate and analyse systems’ interoperability guidelines and recommendations. The author employed the experimental research method while working in the appropriate EU-funded interoperability projects to form the guidelines (recommendations. In order to summarize the results, the evaluative research method was used..Findings – the international guidelines and recommendations presented in the paper could be suitable for implementation while developing Lithuanian state education information systems such as the Lithuanian education portal, the Lithuanian academic libraries’ (eLABa system, the Lithuanian distance learning system (LieDM, and the Lithuanian universities’ management system (LieMSIS.Research limitations/implications – the paper

  9. Interoperability Guidelines for Lithuanian E-Learning Management Systems

    Directory of Open Access Journals (Sweden)

    Eugenijus Kurilovas

    2013-08-01

    Full Text Available Purpose – the paper aims to analyse e-learning content and repositories along with the problems of learning organisation interoperability. The main objective of the paper is to analyse scientific research results and the newest international experience in the area and to provide interoperability guidelines and recommendations for the implementation of appropriate Lithuanian state programmes. The learning content and repositories recommendations are designed for the implementation of the Lithuanian education portal project as well as Lithuanian Virtual University (LVU programme’s information services’ (LABT / eLABa and e-learning services’ (LieDM sub-programmes. The whole education institution recommendations are designed for the maintenance and development of LVU programme’s management services’ (LieMSIS system.Design/methodology/approach – methods used for the general analysis of proposed interoperability guidelines (reccomendations were bibliographic research and comparative analysis of Lithuanian and foreign scientific works published in periodicals and large-scale EU-funded interoperability projects deliverables. System analysis and comparative analysis methods were used in order to formulate and analyse systems’ interoperability guidelines and recommendations. The author employed the experimental research method while working in the appropriate EU-funded interoperability projects to form the guidelines (recommendations. In order to summarize the results, the evaluative research method was used.Findings – the international guidelines and recommendations presented in the paper could be suitable for implementation while developing Lithuanian state education information systems such as the Lithuanian education portal, the Lithuanian academic libraries’ (eLABa system, the Lithuanian distance learning system (LieDM, and the Lithuanian universities’ management system (LieMSIS.Research limitations/implications – the paper

  10. Project Management Methodology in Human Resource Management

    Science.gov (United States)

    Josler, Cheryl; Burger, James

    2005-01-01

    When charged with overseeing a project, how can one ensure that the project will be completed on time, within budget, and to the satisfaction of everyone involved? In this article, the authors examine project management methodology as a means of ensuring that projects are conducted in a disciplined, well-managed and consistent manner that serves…

  11. Guidelines for Inter-Enterprise Management (IEM), GLOBEMEN Deliverable D23

    DEFF Research Database (Denmark)

    Tølle, Martin; Vesterager, Johan

    2002-01-01

    This document is a deliverable of Work package 2 of the IMS Globemen (GMN) project: D23 Guidelines for Inter-Enterprise Management (IEM). IMS Globemen is an inter-regional project aiming to develop methods, tools and architectures to support inter-enterprise operations in one-of-kind industries......-Project, the developed solution for Inter-Enterprise Management. The structure of the deliverable is as follows: - Chapter 1 introduces the guidelines and outlines the structure of the deliverable - Chapter 2 defines key terms along with a list of acronyms used in the deliverable - Chapter 3 gives a general introduction...... for inter-enterprise management (IEM). - Chapter 5 contains the actual Guidelines The chapter contains guidelines for how to prepare enterprise network in being able to set up and manage virtual enterprises. The section consists of a set of activities an enterprise should/could consider when preparing...

  12. Project management and Enterprise systems

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2006-01-01

    Implementing and Operating integrated Enterprise Systems are a multidimensional effort. It seriously challenges the IT supplier as well as the professional service provider client. The paper discuss these issues in a project management perspective. A framework for supporting project management...

  13. NPP Krsko Severe Accident Management Guidelines Implementation

    International Nuclear Information System (INIS)

    Basic, I.; Krajnc, B.; Bilic-Zabric, T.; Spiler, J.

    2002-01-01

    Severe Accident Management is a framework to identify and implement the Emergency Response Capabilities that can be used to prevent or mitigate severe accidents and their consequences. The USA NRC has indicated that the development of a licensee plant specific accident management program will be required in order to close out the severe accident regulatory issue (Ref. SECY-88-147). Generic Letter 88-20 ties the Accident management Program to IPE for each plant. The SECY-89-012 defines those actions taken during the course of an accident by the plant operating and technical staff to: 1) prevent core damage, 2) terminate the progress of core damage if it begins and retain the core within the reactor vessel, 3) maintain containment integrity as long as possible, and 4) minimize offsite releases. The subject of this paper is to document the severe accident management activities, which resulted in a plant specific Severe Accident Management Guidelines implementation. They have been developed based on the Krsko IPE (Individual Plant Examination) insights, Generic WOG SAMGs (Westinghouse Owners Group Severe Accident Management Guidances) and plant specific documents developed within this effort. Among the required plant specific actions the following are the most important ones: Identification and documentation of those Krsko plant specific severe accident management features (which also resulted from the IPE investigations). The development of the Krsko plant specific background documents (Severe Accident Plant Specific Strategies and SAMG Setpoint Calculation). Also, paper discusses effort done in the areas of NPP Krsko SAMG review (internal and external ), validation on Krsko Full Scope Simulator (Severe Accident sequences are simulated by MAAP4 in real time) and world 1st IAEA Review of Accident Management Programmes (RAMP). (author)

  14. Agile Project Management For Dummies

    CERN Document Server

    Layton, Mark C

    2012-01-01

    Be flexible and faster with Agile project management As mobile and web technologies continue to evolve rapidly, there is added pressure to develop and implement software projects in weeks instead of months. Agile Project Management For Dummies can make that happen. This is the first book to provide a simple, step-by-step guide to Agile Project Management approaches, tools, and techniques. With the fast pace of mobile and web technology development, software project development must keep pace; Agile Project Management enables developers to complete and implement projects more quickly and this b

  15. CONTEMPORARY TRENDS IN PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Ana Argirova

    2015-09-01

    Full Text Available The modern information society in ever increasing business projects and time limits to achieve the objectives at minimum cost leads to a search for ways to manage them. Today, more and more managers use IT tools for project management, and the term itself is associated with software solutions for the optimization and management of projects in different fields of human activity. The paper examines the main characteristics of project management by means of information technology. Key tasks and processes in the project implementation and management are discussed.

  16. NHDOT : process for municipally managed state aid highway program projects

    Science.gov (United States)

    2006-05-23

    The design and construction of Municipally Managed State Aid Highway Program projects must comply with the requirements in this guideline in order to receive State Aid under the applicable provisions of RSA 235. Under this process, State Aid Construc...

  17. LSN MS guidelines for the management of multiple sclerosis.

    Science.gov (United States)

    Shatila, A R; Koussa, S; Jabbour, R; Mourad, A; Aouad, A; Sabbagh, G; Kallab, K; Hilal, R; Khalifeh, R; Gebeily, S; Tourbah, A

    2013-12-01

    The prevalence of multiple sclerosis (MS) in Lebanon is unknown, as there are no available or reliable epidemiological studies to date. The circumstances of Middle East countries are different from those of Europe and North America in terms of differential diagnoses and disease management. The aim of the conference is to establish guidelines for diagnosis, treatment, follow-up and management of patients with MS in Lebanon. Another objective is to discuss and participate in research projects based on epidemiology, clinical trials and more fundamental aspects of the disease in the future. Under the authority of the Lebanese Society of Neurology (LSN), a group of neurologists took the initiative to participate in this LSN MS committee with the purpose of establishing a consensus for the management of patients with MS, and under the supervision of a Coordinator (A.T.) designed by the LSN board. Diagnostic and therapeutic, follow-up and research recommendations were proposed with special emphasis on the specific needs and circumstances of Lebanon. The experts highlighted the importance of considering particular needs, the identification of patients at high risk of developing MS in order to maximize therapeutic opportunities, and cost-effective control of treatment efficacy, as well as global assessment of disability. The experts established guidelines concerning diagnosis, treatment, and follow-up of patients with MS in Lebanon. Furthermore, they recommended some clinical and fundamental research projects. Copyright © 2013 Elsevier Masson SAS. All rights reserved.

  18. Project Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the ''Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs

  19. Nurse managers' challenges in project management.

    Science.gov (United States)

    Suhonen, Marjo; Paasivaara, Leena

    2011-11-01

    To analyse the challenges that nurse managers meet in project management. Project management done by nurse managers has a significant role in the success of projects conducted in work units. The data were collected by open interviews (n = 14). The participants were nurse managers, nurses and public health nurses. Data analysis was carried out using qualitative content analysis. The three main challenges nurse managers faced in project management in health-care work units were: (1) apathetic organization and management, (2) paralysed work community and (3) cooperation between individuals being discouraged. Nurse managers' challenges in project management can be viewed from the perspective of the following paradoxes: (1) keeping up projects-ensuring patient care, (2) enthusiastic management-effective management of daily work and (3) supporting the work of a multiprofessional team-leadership of individual employees. It is important for nurse managers to learn to relate these paradoxes to one another in a positive way. Further research is needed, focusing on nurse managers' ability to promote workplace spirituality, nurse managers' emotional intelligence and their enthusiasm in small projects. © 2011 Blackwell Publishing Ltd.

  20. Clinical practice guideline: management of acute pancreatitis

    Science.gov (United States)

    Greenberg, Joshua A.; Hsu, Jonathan; Bawazeer, Mohammad; Marshall, John; Friedrich, Jan O.; Nathens, Avery; Coburn, Natalie; May, Gary R.; Pearsall, Emily; McLeod, Robin S.

    2016-01-01

    There has been an increase in the incidence of acute pancreatitis reported worldwide. Despite improvements in access to care, imaging and interventional techniques, acute pancreatitis continues to be associated with significant morbidity and mortality. Despite the availability of clinical practice guidelines for the management of acute pancreatitis, recent studies auditing the clinical management of the condition have shown important areas of noncompliance with evidence-based recommendations. This underscores the importance of creating understandable and implementable recommendations for the diagnosis and management of acute pancreatitis. The purpose of the present guideline is to provide evidence-based recommendations for the management of both mild and severe acute pancreatitis as well as the management of complications of acute pancreatitis and of gall stone–induced pancreatitis. Une hausse de l’incidence de pancréatite aiguë a été constatée à l’échelle mondiale. Malgré l’amélioration de l’accès aux soins et aux techniques d’imagerie et d’intervention, la pancréatite aiguë est toujours associée à une morbidité et une mortalité importantes. Bien qu’il existe des guides de pratique clinique pour la prise en charge de la pancréatite aiguë, des études récentes sur la vérification de la prise en charge clinique de cette affection révèlent des lacunes importantes dans la conformité aux recommandations fondées sur des données probantes. Ces résultats mettent en relief l’importance de formuler des recommandations compréhensibles et applicables pour le diagnostic et la prise en charge de la pancréatite aiguë. La présente ligne directrice vise à fournir des recommandations fondées sur des données probantes pour la prise en charge de la pancréatite aiguë, qu’elle soit bénigne ou grave, ainsi que de ses complications et de celles de la pancréatite causée par un calcul biliaire. PMID:27007094

  1. NPP Krsko Severe Accident Management Guidelines Upgrade

    International Nuclear Information System (INIS)

    Mihalina, Mario; Spalj, Srdjan; Glaser, Bruno; Jalovec, Robi; Jankovic, Gordan

    2014-01-01

    Nuclear Power Plant Krsko (NEK) has decided to take steps for upgrade of safety measures to prevent severe accidents, and to improve the means to successfully mitigate their consequences. The content of the program for the NEK Safety Upgrade is consistent with the nuclear industry response to Fukushima accident, which revealed many new insights into severe accidents. Therefore, new strategies and usage of new systems and components should be integrated into current NEK Severe Accident Management Guidelines (SAMG's). SAMG's are developed to arrest the progression of a core damage accident and to limit the extent of resulting releases of fission products. NEK new SAMG's revision major changes are made due to: replacement of Electrical Recombiners by Passive Autocatalytic Recombiners (PARs) and the installation of Passive Containment Filtered Vent System (PCFV); to handle a fuel damage situation in Spent Fuel Pool (SFP) and to assess risk of core damage situation during shutdown operation. (authors)

  2. Managing problematic severe asthma: beyond the guidelines.

    Science.gov (United States)

    Pike, Katharine C; Levy, Mark L; Moreiras, John; Fleming, Louise

    2018-04-01

    This review discusses issues related to managing problematic severe asthma in children and young people. A small minority of children have genuinely severe asthma symptoms which are difficult to control. Children with genuinely severe asthma need investigations and treatments beyond those described within conventional guidelines. However, the majority of children with poor symptom control despite high-intensity treatment achieve improvement in their asthma control once attention has been paid to the basics of asthma management. Basic asthma management requires optimisation of inhaler technique and treatment adherence, avoidance of environmental triggers and self-management education. It is also important that clinicians recognise risk factors that predispose patients to asthma exacerbations and potentially life-threatening attacks. These correctable issues need to be tackled in partnership with children and young people and their families. This requires a coordinated approach between professionals across healthcare settings. Establishing appropriate infrastructure for coordinated asthma care benefits not only those with problematic severe asthma, but also the wider asthma population as similar correctable issues exist for children with asthma of all severities. Investigation and management of genuine severe asthma requires specialist multidisciplinary expertise and a systematic approach to characterising patients' asthma phenotypes and delivering individualised care. While inhaled corticosteroids continue to play a leading role in asthma therapy, new treatments on the horizon might further support phenotype-specific therapy. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  3. Project and Sports Events Management

    OpenAIRE

    Sebastian Madalin MUNTEANU

    2011-01-01

    This paper tries to capture the importance it holds the project management in socio-cultural sector which stands out when we refer to the sport. So when we talk about project management in sport, to consider a much larger vision, a new project management perspective, they involve a responsibility for the implementation of an event with global impact on very long term. Sports projects, as history shows us, played a significant role in developing societies. Also, all major sports industry proje...

  4. Project Portfolio Management Applications Testing

    OpenAIRE

    Paul POCATILU

    2006-01-01

    Many IT companies are running project simultaneously. In order to achieve the best results, they have to group to the project in portfolios, and to use specific software that helps to manage them. Project portfolio management applications have a high degree of complexity and they are very important for the companies that are using it. This paper focuses on some characteristics of the testing process for project portfolio management applications

  5. Project Portfolio Management Applications Testing

    Directory of Open Access Journals (Sweden)

    Paul POCATILU

    2006-01-01

    Full Text Available Many IT companies are running project simultaneously. In order to achieve the best results, they have to group to the project in portfolios, and to use specific software that helps to manage them. Project portfolio management applications have a high degree of complexity and they are very important for the companies that are using it. This paper focuses on some characteristics of the testing process for project portfolio management applications

  6. Tokyo Guidelines 2018: management bundles for acute cholangitis and cholecystitis

    NARCIS (Netherlands)

    Mayumi, Toshihiko; Okamoto, Kohji; Takada, Tadahiro; Strasberg, Steven M.; Solomkin, Joseph S.; Schlossberg, David; Pitt, Henry A.; Yoshida, Masahiro; Gomi, Harumi; Miura, Fumihiko; Garden, O. James; Kiriyama, Seiki; Yokoe, Masamichi; Endo, Itaru; Asbun, Horacio J.; Iwashita, Yukio; Hibi, Taizo; Umezawa, Akiko; Suzuki, Kenji; Itoi, Takao; Hata, Jiro; Han, Ho-Seong; Hwang, Tsann-Long; Dervenis, Christos; Asai, Koji; Mori, Yasuhisa; Huang, Wayne Shih-Wei; Belli, Giulio; Mukai, Shuntaro; Jagannath, Palepu; Cherqui, Daniel; Kozaka, Kazuto; Baron, Todd H.; de Santibañes, Eduardo; Higuchi, Ryota; Wada, Keita; Gouma, Dirk J.; Deziel, Daniel J.; Liau, Kui-Hin; Wakabayashi, Go; Padbury, Robert; Jonas, Eduard; Supe, Avinash Nivritti; Singh, Harjit; Gabata, Toshifumi; Chan, Angus C. W.; Lau, Wan Yee; Fan, Sheung Tat; Chen, Miin-Fu; Ker, Chen-Guo; Yoon, Yoo-Seok; Choi, In-Seok; Kim, Myung-Hwan; Yoon, Dong-Sup; Kitano, Seigo; Inomata, Masafumi; Hirata, Koichi; Inui, Kazuo; Sumiyama, Yoshinobu; Yamamoto, Masakazu

    2018-01-01

    Management bundles that define items or procedures strongly recommended in clinical practice have been used in many guidelines in recent years. Application of these bundles facilitates the adaptation of guidelines and helps improve the prognosis of target diseases. In Tokyo Guidelines 2013 (TG13),

  7. Demand-side management project for Tenaga Nasional Berhad. Energy efficiency guidelines. Progress report No. 3. Volume 1. Final report. Export trade information

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-05-01

    This study, conducted by the California Energy Commission, was funded by the U.S. Trade and Development Agency. The report summarizes a demand-side management study performed for the Tenaga Nasional Berhad Headquarters Building. The purpose of the study was to identify and evaluate demand side management measures (DSMs) that would reduce energy costs of the facility. Volume 1 is divided into the following sections: (1.0) Executive Summary; (2.0) Facility Background; (3.0) Ventilating and Air Conditioning Systems Description; (4.0) Lightning System Description; Figures, Tables, and Appendices.

  8. Rethinking Project Management in Denmark

    DEFF Research Database (Denmark)

    Svejvig, Per

    2012-01-01

    . The chapter argues for a rethinking process due to pervasiveness and complexity in the contemporary project environment where rethinking is needed in order to stay competitive. The suggested approach for the rethinking project management is a framing process where body of ideas is established......Projects are everywhere across different sectors, industries and countries. Project management is no longer a sub-discipline of engineering and other rather technical disciplines but is also used for many other purposes. Even though practice has changed dramatically over the years, the models...... and methodologies for project management has been fairly static and has therefore received substantial criticism for a lack of relevance to practice. Several scholars have therefore started to think more widely about projects and project management conceptualized as rethinking project management. However this theme...

  9. Guideline for primary care management of headache in adults

    Science.gov (United States)

    Becker, Werner J.; Findlay, Ted; Moga, Carmen; Scott, N. Ann; Harstall, Christa; Taenzer, Paul

    2015-01-01

    Abstract Objective To increase the use of evidence-informed approaches to diagnosis, investigation, and treatment of headache for patients in primary care. Quality of evidence A comprehensive search was conducted for relevant guidelines and systematic reviews published between January 2000 and May 2011. The guidelines were critically appraised using the AGREE (Appraisal of Guidelines for Research and Evaluation) tool, and the 6 highest-quality guidelines were used as seed guidelines for the guideline adaptation process. Main message A multidisciplinary guideline development group of primary care providers and other specialists crafted 91 specific recommendations using a consensus process. The recommendations cover diagnosis, investigation, and management of migraine, tension-type, medication-overuse, and cluster headache. Conclusion A clinical practice guideline for the Canadian health care context was created using a guideline adaptation process to assist multidisciplinary primary care practitioners in providing evidence-informed care for patients with headache. PMID:26273080

  10. Management of research and development project

    International Nuclear Information System (INIS)

    Go, Seok Hwa; Hong Jeong Yu; Hyun, Byeong Hwan

    2010-12-01

    This book introduces summary on management of research and development project, prepare of research and development with investigation and analysis of paper, patent and trend of technology, structure of project, management model, management of project, management of project range, management of project time, management of project cost, management of project goods, management of project manpower, management of communication, management of project risk, management of project supply, management of outcome of R and D, management of apply and enroll of patent and management of technology transfer.

  11. Best practice guidelines for stroke in Cameroon: An innovative and participatory knowledge translation project

    Directory of Open Access Journals (Sweden)

    Lynn Cockburn

    2014-11-01

    Objectives: The purpose of this article is to describe how a group of front-line practitioners collaborated with academics and students to develop best practice guidelines (BPG for the management and rehabilitation of stroke in adult patients in Cameroon. Method: A working group was established and adapted internationally recognised processes for the development of best practice guidelines. The group determined the scope of the guidelines, documented current practices, and critically appraised evidence to develop guidelines relevant to the Cameroon context. Results: The primary result of this project is best practice guidelines which provided an overview of the provision of stroke rehabilitation services in the region, and made 83 practice recommendations to improve these services. We also report on the successes and challenges encountered during the process, and the working group’s recommendations aimed at encouraging others to consider similar projects. Conclusion: This project demonstrated that there is interest and capacity for improving stroke rehabilitation practices and for stroke guideline development in Africa.

  12. Managing Ulcerative Colitis – The Guidelines and Beyond

    Directory of Open Access Journals (Sweden)

    Mitchell RKL Lie

    2013-11-01

    Full Text Available Management guidelines offer clinicians clear, evidence-based and often succinct treatment advice. For ulcerative colitis these guidelines describe the use of 5-ASA, corticosteroids, thiopurines, cyclosporine, and anti-TNFα therapies. However, guidelines do have some drawbacks, mainly a lack of concrete advice concerning patients resistant to these aforementioned therapies. This review gives a short overview of current guidelines and addresses treatment alternatives for conventional therapies.

  13. Project Management in Higher Education

    Science.gov (United States)

    Alpert, Shannon Atkinson

    2011-01-01

    This study identified factors that influenced the use of project management in higher education research projects. Using a qualitative grounded theory approach that included in-depth interviews with assistant professors, the researcher examined how these individuals were using project management processes and tools and factors that enabled,…

  14. Comprehensive management of project changes

    Directory of Open Access Journals (Sweden)

    Aljaž Stare

    2010-06-01

    Full Text Available The goal of this research was to examine how project changes can be prevented, and how to reduce their negative impact. Theoretical research examined risk management, project control and change management. Based on the study a “Comprehensive Change Management Model” was developed and verified after conducting empirical research in Slovenian enterprises. The research confirmed that risk management identifies possible changes and reduces their impact; project control ensures the timely detection of changes and an efficient response, while formal change management ensures the effective implementation of changes. The combined functioning of all three areas ensures effective project execution.

  15. Risk management in nuclear projects

    International Nuclear Information System (INIS)

    Salles, Claudio J.R.

    2002-01-01

    The risk management will be defined by different aspects: danger or loss possibility, or responsibility for damage. The risk management is one stage of project management. The risk management is a continuous process of planning, identification, quantification, answer and risk control to maximize the success potential of activity. The reduction of risk is part of priority establishment. This work will indicate how introduce this important instrument in the management of nuclear projects. (author)

  16. Project management in building industry management

    Directory of Open Access Journals (Sweden)

    Martin Nový

    2012-01-01

    Full Text Available The article deals with contents of the project management on general level first. It mentions the most widespread project management standards, which have historically developed in global scale, their parts and objectives. Further, it describes position of the building industry in national economy, its specific features distinguishing it from the other industrial production, contents of the building industry management and project management of structures. The importance of the role of project manager is documented by characteristics of construction projects, their course, contents of sub-phases, and individual types of managing activities. Attention is devoted to project planning – determination of realization costs, necessary resources, sequence and time course of individual works. The most frequently used graphic methods of schedule presentation – Gantt chart, network chart and frequency bar chart are applied on examples of constructions. These charts can be focused in time sequence on individual types of resources – workforce, finance, materials, energies, and machinery. In conclusion, necessity to manage the project management procedures is emphasized as a part of skills of a construction engineer in the role of preparation manager or construction project realization manager.

  17. Global Project Management: Graduate Course

    National Research Council Canada - National Science Library

    Beranek, Thomas R

    2006-01-01

    ..., A. James Clark School of Engineering - Project Management Program. The course slides and suggested readings provide a general exploration of the nuances of doing projects globally as compared to domestically...

  18. Efficient and Effective Project Management

    Directory of Open Access Journals (Sweden)

    Dusan Pene

    2014-03-01

    Full Text Available The purpose of the article is to investigate different authorities and responsibilities of a project manager and of a project leader. Considering the fact that nowadays the project management is becoming the important factor in performing and leading the investments which are modified by modern leadership theories, we can say that the key element is the sovereign leadership of a manager and a project leader. The current multi-project environments and modern techniques at the project management area need the interdisciplinary leadership approach and at the same time they enable the strengthening of company’s competitive features so they are consistently satisfying high project expectations of the project investor or a client.

  19. Public participation in UMTRA Project Program Management

    International Nuclear Information System (INIS)

    Majors, M.J.; Ulland, L.M.

    1993-01-01

    The U.S. Department of Energy (DOE) is cleaning up radioactive soil and ore residue from 24 inactive uranium processing sites under the Uranium Mill Tailings Remedial Action (UMTRA) Project. In early 1993, the DOE adopted new guidelines strongly encouraging public participation. This guidance commits to providing the public with opportunities to participate in the decision-making process for program planning, design, and implementation. Rooted in the conviction that an effective public participation program will enable citizens to take part in policy decisions, the full adoption of the guidance by the UMTRA project can also help DOE make better decisions, provide a means to build consensus, and assist in building credibility. This transition to open communication parallels the climate of corporate America in which increases in productivity are often the result of workers and management teaming together to solve problems. While these guidelines have been embraced by public affairs staff from headquarters to the field offices, barriers still exist that inhibit substantive public involvement. The challenge for the UMTRA project is to overcome these barriers to ensure that public participation is an integral part of the way business is conducted. This paper discusses lessons learned by the UMTRA project in its efforts to address barriers to public participation and the project's plans for full compliance with the DOE guidelines

  20. Guidelines for Lifelong Education Management to Mobilize Learning Community

    Science.gov (United States)

    Charungkaittikul, Suwithida

    2018-01-01

    This article is a study of the guidelines for lifelong education management to mobilize learning communities in the social-cultural context of Thailand is intended to 1) analyze and synthesize the management of lifelong learning to mobilize learning community in the social-cultural context of Thailand; and 2) propose guidelines for lifelong…

  1. Guidelines for managing cardiovascular risk: an evolving area

    DEFF Research Database (Denmark)

    Currier, Judith S; Lundgren, Jens

    2008-01-01

    PURPOSE OF REVIEW: To reflect on the need for guidelines to assist clinicians in the management of cardiovascular risk in HIV-infected patients. RECENT FINDINGS: Over the past eight years guidelines for the management of dyslipidemia and metabolic complications of HIV infection have been developed...

  2. Risk Management for New Product Development Projects in Food Industry

    Directory of Open Access Journals (Sweden)

    Porananond, D.

    2014-07-01

    Full Text Available Project risk management provides a guideline for decision making in new product development (NPD projects, reducing uncertainty and increasing success rate. However, the acceptance of formal risk management applications in industry, especially for NPD projects is still in question. A study of a food conglomerate in Thailand found that only 9% of NPD projects used a systematic approach for managing risk. 61% of the projects realised the importance of risk management, while the remaining 30% did not involve risk management at all. This study aims to develop a risk management model for NPD projects in the food industry. The first section of this paper reviews the literature on risk management theory, including international standards for risk and project management (ISO31000 and ISO21500, publications for the Project Management Body of Knowledge (PMBOK, by a professional organisation the Project Management Institute (PMI, and also academic research. 182 academic papers, published between January 2002 and August 2012 were selected. The second part interviews conducted with eight NPD experts from five of the major food manufacturers in Thailand to examine their risk management practices and problems. Conclusions are made on five topics : classification of research method, project type and industrial segment, distribution of articles by region, tools & techniques for risk management and risk factors in projects. Specific requirements of risk management for NPD projects in the food industry are identified. A risk management model and the concept of risk management applications for the food industry are proposed.

  3. Revised guidelines on management of antenatal hydronephrosis

    Science.gov (United States)

    Sinha, A.; Bagga, A.; Krishna, A; Bajpai, M.; Srinivas, M.; Uppal, R.; Agarwal, I.

    2013-01-01

    Widespread antenatal screening has resulted in increased detection of anomalies of the kidneys and urinary tract. The present guidelines update the recommendations published in 2000. Antenatal hydronephrosis (ANH) is transient and resolves by the third trimester in almost one-half cases. The presence of oligohydramnios and additional renal or extrarenal anomalies suggests significant pathology. All patients with ANH should undergo postnatal ultrasonography; the intensity of subsequent evaluation depends on anteroposterior diameter (APD) of the renal pelvis and/or Society for Fetal Urology (SFU) grading. Patients with postnatal APD exceeding 10 mm and/or SFU grade 3-4 should be screened for upper or lower urinary tract obstruction and vesicoureteric reflux (VUR). Infants with VUR should receive antibiotic prophylaxis through the first year of life, and their parents counseled regarding the risk of urinary tract infections. The management of patients with pelviureteric junction or vesicoureteric junction obstruction depends on clinical features and results of sequential ultrasonography and radionuclide renography. Surgery is considered in patients with increasing renal pelvic APD and/or an obstructed renogram with differential renal function <35-40% or its subsequent decline. Further studies are necessary to clarify the role of prenatal intervention, frequency of follow-up investigations and indications for surgery in these patients. PMID:23716913

  4. Ecoturism: Concepts, Reflections and Guidelines for Landscape Projects

    Directory of Open Access Journals (Sweden)

    Luis Guilherme A. Pippi

    2010-12-01

    Full Text Available This study aims to expound some concepts and guidelines within the area of ecotourism, in order to aid all those involved in the area, both directly and indirectly, in the process of conception and maintenance of Areas of Environmental Preservation. The analysis deals with the articulation of main objectives and project strategies. In alternative tourism projects, application of methodologies of diagnosis and interpretation, as well as creative sensibility and knowledge of landscape building materials are all necessary in order to conserve the natural and cultural heritage of a region and provide the community and ecotourist with an awakening of environmental consciousness.

  5. From Project Management to Process Management - Effectively Organising Transdisciplinary Projects

    OpenAIRE

    Moschitz, Heidrun

    2013-01-01

    In transdisciplinary projects, the roles of researchers change. In addition to being a source of knowledge, they are required to engage in knowledge exchange processes. This results in an alteration at project level: researchers need to creatively manage projects as group processes.

  6. The Environmental Management Project Manager's Handbook for improved project definition

    International Nuclear Information System (INIS)

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook

  7. Systematic review of guidelines for the physical management of osteoarthritis.

    Science.gov (United States)

    Larmer, Peter J; Reay, Nicholas D; Aubert, Elizabeth R; Kersten, Paula

    2014-02-01

    To undertake a systematic critical appraisal of guidelines to provide a summary of recommendations for the physical management of osteoarthritis (OA). The Cochrane Library, MEDLINE, CINAHL, SPORTDiscus with Full Text, Scopus, ScienceDirect, PEDro, and Google Scholar databases were searched (2000-2013) to identify all guidelines, protocols, and recommendations for the management or treatment of OA. In addition, Internet searches of all relevant arthritis organizations were undertaken. All searches were performed between July 2012 and end of April 2013. Guidelines that included only pharmacological, injection therapy, or surgical interventions were excluded. Guidelines published only in English were retrieved. OA guidelines developed from evidence-based research, consensus, and/or expert opinion were retrieved. There were no restrictions on severity or site of OA, sex, or age. Nineteen guidelines were identified for evaluation. The quality of all guidelines was critically appraised using the Appraisal of Guidelines for REsearch and Evaluation II instrument. Each guideline was independently reviewed. All relevant recommendations for the physical management of OA were synthesized, graded, and ranked according to available evidence. Seventeen guidelines with recommendations on the physical management of OA met the inclusion criteria and underwent a full critical appraisal. There were variations in the interventions, levels of evidence, and strength of recommendations across the guidelines. Forty different interventions were identified. Recommendations were graded from "strongly recommended" to "unsupported." Exercise and education were found to be strongly recommended by most guidelines. Exercise and education were key recommendations supporting the importance of rehabilitation in the physical management of OA. This critical appraisal can assist health care providers who are involved in the management of people with OA. Copyright © 2014 American Congress of

  8. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  9. Mobile Project Management

    Directory of Open Access Journals (Sweden)

    Catalin BOJA

    2006-01-01

    Full Text Available Based on the development of new communication and data transfer technologies, the mobile solutions for the management process have been able to provide new ways to conduct management actions. This environment describes methods and tools available only here, which will bring information, speed and efficiency to any stage and component of the management process. The paper takes into discussion the impact of the technological development on the management process paradigm. The paper presents the main aspects regarding the business and management models used in mobile management. The role of mobile multimedia informatics applications in mobile management is highlighted.

  10. Cancer related fatigue: implementing guidelines for optimal management.

    Science.gov (United States)

    Pearson, Elizabeth J M; Morris, Meg E; McKinstry, Carol E

    2017-07-18

    Cancer-related fatigue (CRF) is a key concern for people living with cancer and can impair physical functioning and activities of daily living. Evidence-based guidelines for CRF are available, yet inconsistently implemented globally. This study aimed to identify barriers and enablers to applying a cancer fatigue guideline and to derive implementation strategies. A mixed-method study explored the feasibility of implementing the CRF guideline developed by the Canadian Association for Psychosocial Oncology (CAPO). Health professionals, managers and consumers from different practice settings participated in a modified Delphi study with two survey rounds. A reference group informed the design of the study including the surveys. The first round focused on guideline characteristics, compatibility with current practice and experience, and behaviour change. The second survey built upon and triangulated the first round. Forty-five health practitioners and managers, and 68 cancer survivors completed the surveys. More than 75% of participants endorsed the CAPO cancer related fatigue guidelines. Some respondents perceived a lack of resources for accessible and expert fatigue management services. Further barriers to guideline implementation included complexity, limited practical details for some elements, and lack of clinical tools such as assessment tools or patient education materials. Recommendations to enhance guideline applicability centred around four main themes: (1) balancing the level of detail in the CAPO guideline with ease of use, (2) defining roles of different professional disciplines in CRF management, (3) how best to integrate CRF management into policy and practice, (4) how best to ensure a consumer-focused approach to CRF management. Translating current knowledge on optimal management of CRF into clinical practice can be enhanced by the adoption of valid guidelines. This study indicates that it is feasible to adopt the CAPO guidelines. Clinical application may

  11. Making sense of project management

    DEFF Research Database (Denmark)

    Kjærgaard, Annemette; Kautz, Karl; Nielsen, Peter Axel

    2007-01-01

    How can a software company make sense of project management when it becomes involved in software process improvement? In software development most research has an instrumental view of knowledge management thus neglecting what is probably the most important part of knowledge management namely making...... sense of practice by developers and project managers. Through an action case, we study the knowledge management processes in a Danish software company. We analyse the case through the lens of a theoretical framework. The theoretical framework focuses in particular on sensemaking, collective construed...... substantial insight which could not have been achieved through an instrumental perspective on knowledge management....

  12. Project Management Personnel Competencies Evaluation

    Directory of Open Access Journals (Sweden)

    Paul POCATILU

    2006-01-01

    Full Text Available An important factor for the success management of IT projects is the human resource. People involved in the project management process have to be evaluated. In order to do that, same criteria has to be specified. This paper describes some aspects regarding the personnel evaluation.

  13. Managing challenging interactions with family caregivers in the cancer setting: Guidelines for clinicians (TRIO Guidelines-2).

    Science.gov (United States)

    Laidsaar-Powell, Rebekah; Butow, Phyllis; Boyle, Frances; Juraskova, Ilona

    2018-06-01

    Family caregivers can, at times, add complexity to clinical encounters. Difficult family caregivers and dynamics may: derail consultation communication, reduce patient autonomy, and compromise effective clinical care. A paucity of practical strategies guiding effective clinician-family communication exists. This study aimed to develop and evaluate the first comprehensive, evidence-based guidelines (the TRIO guidelines) for oncology physicians and nurses to better manage several complex/challenging situations involving family members. TRIO Guidelines were based on a comprehensive review of literature, relevant guidelines, and feedback from an expert advisory group (n = 10). Draft guidelines underwent two rounds of evaluation via an online Delphi consensus process involving international experts (n = 35). Guidelines incorporate topic areas, strategies, and sub-strategies on managing challenging family involvement (7 topics). Example wording, behaviours and level of evidence are provided. Challenging triadic interactions require skillful navigation, and the TRIO Guidelines provide clear, specific, and evidence-based strategies for clinicians to utilise in these potentially stressful encounters. Training based on these guidelines may improve both patient care and clinician confidence. Implementation of these guidelines into medical/nursing curricula and as a component of continuing professional development programs will likely be highly beneficial. Copyright © 2018 Elsevier B.V. All rights reserved.

  14. Application of Project Portfolio Management

    Science.gov (United States)

    Pankowska, Malgorzata

    The main goal of the chapter is the presentation of the application project portfolio management approach to support development of e-Municipality and public administration information systems. The models of how people publish and utilize information on the web have been transformed continually. Instead of simply viewing on static web pages, users publish their own content through blogs and photo- and video-sharing slides. Analysed in this chapter, ICT (Information Communication Technology) projects for municipalities cover the mixture of the static web pages, e-Government information systems, and Wikis. So, for the management of the ICT projects' mixtures the portfolio project management approach is proposed.

  15. 6 Project-Management Tips

    Science.gov (United States)

    Demski, Jennifer

    2012-01-01

    When it comes to project management, the IT department is typically its own worst enemy. When project requests are pushed through the budgeting process by different departments, it's up to IT to make them all work. The staff is required to be "heroic" to get the project load done. People get to work over weekends and postpone their vacations. The…

  16. Risk management guidelines for petroleum storage tank sites

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-10-01

    These guidelines provide a site management process designed particularly for soil and groundwater pollution originating from existing or former petroleum storage tank (PST) facilities and provide uniform standards for the remediation of polluted PST sites in Alberta. The numerical criteria, risk management objectives and technical information described in this document were compiled from four documents including Remediation Guidelines for Petroleum Storage Tank Sites 1994, the Canada-Wide Standards for Petroleum Hydrocarbons in Soil, Alberta Soil and Water Quality Guidelines for Hydrocarbons at Upstream Oil and Gas Facilities, and Guidelines for Managing Risks at Contaminated Sites in Alberta. The changes in these updated guidelines reflect new remediation criteria and provide a process for determining alternate site-specific management objectives for more petroleum storage tank sites. The guidelines were developed using a risk-based approach that ensures the protection of human health, safety and the environment. The guidelines apply to aboveground and underground storage tank facilities that contain gasoline, diesel, heating oil, and aviation fuel. The guidelines specify requirements by Alberta Environment and the Alberta Fire Code. The chapter on risk management process included information on site investigation, determination of soil type, pollution source removal, land use assessment, selection of exposure pathways, depth of remediation, human inhalation and groundwater protection pathways, and verification of remediation. figs, 4 tabs., 2 appendices.

  17. Managing regional innovation strategy projects

    OpenAIRE

    Wolf, Patricia; Hanisch, Christoph

    2014-01-01

    This paper presents a qualitative interview study with 28 RIS project managers that aimed at understanding whether or not this is true in the context of regional innovation and what the specifics of managing regional innovation projects are. In taking up a recent claim for policy intervention studies which allow to “derive precise suggestions for their design and management”.  The study investigated the interrelation between the agility of the management approach and the achievements of RIS p...

  18. Methodologies used in Project Management

    OpenAIRE

    UNGUREANU, Adrian; UNGUREANU, Anca

    2014-01-01

    Undoubtedly, a methodology properly defined and strictly followed for project management provides a firm guarantee that the work will be done on time, in budget and according to specifications. A project management methodology in simple terms is a “must-have” to avoid failure and reduce risks, because is one of the critical success factors, such basic skills of the management team. This is the simple way to guide the team through the design and execution phases, processes and tasks throughout...

  19. EDUCATIONAL PROJECTS STAKEHOLDER MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Юлія Юріївна ГУСЄВА

    2016-02-01

    Full Text Available An approach based on an integration of requirements breakdown structure and work breakdown structure of the project is proposed. It can complement existing methods of project stakeholders classification with the indicator of resource input, which can be defined in monetary terms. A method of requirements monitoring is proposed, which allows you to track the requirements of project stakeholders over time according to the actual amount of resources spent by analogy with the earned value method. Proposed indexes are the basis not only for monitoring but for the forecast of the project. The need of creating of a mechanism for getting baseline data taking into account the existence of different types of requirements of project stakeholders is grounded.

  20. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  1. Guidelines for operator competence - Optimising facility management processes; Leitfaden Betreiberkompetenz. Schritt fuer Schritt Facility Management Prozesse optimieren

    Energy Technology Data Exchange (ETDEWEB)

    Moser, R

    2005-06-15

    This brochure issued by IFMA (International Facility Management Association) Switzerland and the Swiss Federal Office of Energy (SFOE) presents interactive guidelines for energy management in the area of facility management. These guidelines are based on the results of a project carried out by the International Energy Agency's Annex 40 'Operator competence'. The guidelines provide a step-by-step guide from initial analysis through to successful project completion and answer many questions that may crop up during the process. The focus is placed on energy aspects. Tools and 14 sample process descriptions are provided along with practical examples. Theoretical aspects are also presented and discussed, including models for operator roles and the processes involved. Also, change, risk and knowledge management are examined. Notes and information on possibilities for further education are presented.

  2. Guidelines for operator competence - Optimising facility management processes; Leitfaden Betreiberkompetenz. Schritt fuer Schritt Facility Management Prozesse optimieren

    Energy Technology Data Exchange (ETDEWEB)

    Moser, R.

    2005-06-15

    This brochure issued by IFMA (International Facility Management Association) Switzerland and the Swiss Federal Office of Energy (SFOE) presents interactive guidelines for energy management in the area of facility management. These guidelines are based on the results of a project carried out by the International Energy Agency's Annex 40 'Operator competence'. The guidelines provide a step-by-step guide from initial analysis through to successful project completion and answer many questions that may crop up during the process. The focus is placed on energy aspects. Tools and 14 sample process descriptions are provided along with practical examples. Theoretical aspects are also presented and discussed, including models for operator roles and the processes involved. Also, change, risk and knowledge management are examined. Notes and information on possibilities for further education are presented.

  3. Waste Management Process Improvement Project

    International Nuclear Information System (INIS)

    Atwood, J.; Borden, G.; Rangel, G. R.

    2002-01-01

    The Bechtel Hanford-led Environmental Restoration Contractor team's Waste Management Process Improvement Project is working diligently with the U.S. Department of Energy's (DOE) Richland Operations Office to improve the waste management process to meet DOE's need for an efficient, cost-effective program for the management of dangerous, low-level and mixed-low-level waste. Additionally the program must meet all applicable regulatory requirements. The need for improvement was highlighted when a change in the Groundwater/Vadose Zone Integration Project's waste management practices resulted in a larger amount of waste being generated than the waste management organization had been set up to handle

  4. Information management for decommissioning projects

    International Nuclear Information System (INIS)

    LeClair, A.N.; Lemire, D.S.

    2011-01-01

    This paper explores the importance of records and information management for decommissioning projects. Key decommissioning information and elements of a sound information management strategy are identified. Various knowledge management strategies and tools are discussed as opportunities for leveraging decommissioning information. The paper also examines the implementation of Atomic Energy of Canada Limited's (AECL) strategy for the long term preservation of decommissioning information, and its initiatives in leveraging of information with the application of several knowledge management strategies and tools. The implementation of AECL's strategy illustrates common as well as unique information and knowledge management challenges and opportunities for decommissioning projects. (author)

  5. [The German Program for Disease Management Guidelines: CHD Guideline 2006. Short review].

    Science.gov (United States)

    Ollenschläger, Günter; Lelgemann, Monika; Kopp, Ina

    2006-12-15

    In Germany, the first national consensus on evidence-based recommendations for disease management in patients with chronic coronary heart disease was reached in summer 2006. After a development period of 4 years, the National Disease Management Guideline Chronic Coronary Heart Disease was finalized by nominal group process under the authorship of the scientific associations for cardiac rehabilitation (DGPR), cardiac surgery (DGTHG), cardiology (DGK), general internal medicine (DGIM), family medicine (DEGAM), and the Drug Commission of the German Medical Association (AKDAE). The recommendations' main sources are the ACC/AHA guidelines 2002 updates as well as existing German guidelines and reviews of recent scientific evidence. The article gives an overview on authors, sources, and key recommendations of the German National Disease Management Guideline Chronic Coronary Heart Disease 2006 (www.khk.versorgungsleitlinie.de).

  6. [The German Program for Disease Management Guidelines: COPD Guideline 2006. Short review].

    Science.gov (United States)

    Ollenschläger, Günter; Kopp, Ina; Lelgemann, Monika

    2007-01-15

    In Germany, the first national consensus on evidence-based recommendations for COPD prevention and disease management was reached in spring 2006. After a development period of 9 months, the National Disease Management Guideline COPD was finalized by nominal group process under the authorship of the scientific societies for pneumology (DGP and Atemwegsliga), general internal medicine (DGIM), family medicine (DEGAM), and the Drug Commission of the German Medical Association (AKDAE). The recommendations' main sources are the NICE COPD Guideline 2004, the GOLD Recommendations as well as existing German guidelines and reviews of recent scientific evidence. The article gives an overview on authors, sources, and key recommendations of the German National Disease Management Guideline COPD 2006 (www.copd.versorgungsleitlinien.de).

  7. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  8. Project Management Plan Solution Stabilization

    International Nuclear Information System (INIS)

    SATO, P.K.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process

  9. HBR guide to project management

    CERN Document Server

    Harvard Business Review

    2013-01-01

    MEET YOUR GOALS—ON TIME AND ON BUDGET. How do you rein in the scope of your project when you’ve got a group of demanding stakeholders breathing down your neck? And map out a schedule everyone can stick to? And motivate team members who have competing demands on their time and attention? Whether you’re managing your first project or just tired of improvising, this guide will give you the tools and confidence you need to define smart goals, meet them, and capture lessons learned so future projects go even more smoothly. The HBR Guide to Project Management will help you: • Build a strong, focused team • Break major objectives into manageable tasks • Create a schedule that keeps all the moving parts under control • Monitor progress toward your goals • Manage stakeholders’ expectations • Wrap up your project and gauge its success

  10. Guidelines for the management of contact dermatitis: an update.

    LENUS (Irish Health Repository)

    Bourke, J

    2012-02-01

    These guidelines for management of contact dermatitis have been prepared for dermatologists on behalf of the British Association of Dermatologists. They present evidence-based guidance for investigation and treatment, with identification of the strength of evidence available at the time of preparation of the guidelines, including details of relevant epidemiological aspects, diagnosis and investigation.

  11. Guidelines for the management of contact dermatitis: an update.

    LENUS (Irish Health Repository)

    Bourke, J

    2009-05-01

    These guidelines for management of contact dermatitis have been prepared for dermatologists on behalf of the British Association of Dermatologists. They present evidence-based guidance for investigation and treatment, with identification of the strength of evidence available at the time of preparation of the guidelines, including details of relevant epidemiological aspects, diagnosis and investigation.

  12. Managing a project's legacy: implications for organizations and project management

    Science.gov (United States)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  13. PROJECT APPROACH TO ENERGY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Інга Борисівна СЕМКО

    2016-02-01

    Full Text Available Project management is widely used around the world as a tool to improve business performance. Correct implementation of the program of implementation of energy efficiency is accompanied by the adoption of an appropriate legislative framework, support programs, the approval of market-based instruments. Currently, it is paying enough attention to the effective application of market-based instruments, although most of the activities in the field of energy efficiency from the economic side are quite profitable. The authors suggested the use of the methodology of project management to the management of energy-saving measures, new approaches to the place and role of project management in the hierarchy of guidance. As a result, this innovation can improve the competitiveness of enterprises. The conclusions that the energy-saving project management allows you to get the best results for their implementation by reducing the time, resources, risk reduction.

  14. Agile Project Management with Scrum

    CERN Document Server

    Schwaber, Ken

    2009-01-01

    The rules and practices for Scrum-a simple process for managing complex projects-are few, straightforward, and easy to learn. But Scrum's simplicity itself-its lack of prescription-can be disarming, and new practitioners often find themselves reverting to old project management habits and tools and yielding lesser results. In this illuminating series of case studies, Scrum co-creator and evangelist Ken Schwaber identifies the real-world lessons-the successes and failures-culled from his years of experience coaching companies in agile project management. Through them, you'll understand how to

  15. PROJECT MANAGER SKILLS, RISK MANAGEMENT TOOLS

    Directory of Open Access Journals (Sweden)

    Vladut Iacob

    2013-12-01

    Full Text Available Although the projects are different from each other there are many common things that contribute to their success. Looked overall, the success of a project is the result of a multitude of factors. This person is considered the "engine" of the project. The man who makes the action set for the achievement of project objectives to be brought to an end. The project manager must have the technical knowledge and economic diverse. He should be able to choose a team and lead. You must be tenacious, combative, to know how to communicate both within the team and beyond. In a word, the project manager must have an impressive stock of knowledge, skills and abilities and appreciate as Peter Drucker, to "exist for the organization. To be its servant. Any management who forget this will only cause damage to the organization. "This study will focus on highlighting the skills of the project manager and their role in managing difficult situations or risk.

  16. WIPP Project Records Management Handbook

    International Nuclear Information System (INIS)

    1991-01-01

    The Waste Isolation Pilot Plant (WIPP) Records Management Handbook provides the WIPP Project Records Management personnel with a tool to use to fulfill the requirements of the WIPP Records Program and direct their actions in the important area of records management. The handbook describes the various project areas involved in records management, and how they function. The handbook provides the requirements for Record Coordinators and Master Record Center (MRC) personnel to follow in the normal course of file management, records scheduling, records turnover, records disposition, and records retrieval. More importantly, the handbook provides a single reference which encompasses the procedures set fourth in DOE Order 1324.2A, ''Records Disposition'' ASME NQA-1, ''Quality Assurance Program Requirements for Nuclear Facilities'' and DOE-AL 5700.6B, ''General Operations Quality Assurance.'' These documents dictate how an efficient system of records management will be achieved on the WIPP Project

  17. Effectiveness of Traumatic Brain Injury Management Guideline Introduction in Hungary.

    Science.gov (United States)

    Sorinola, Abayomi; Buki, Andras; Sandor, Janos; Czeiter, Endre

    2018-01-01

    To describe the impact of the Traumatic Brain Injury management guideline introduction in Hungary. Hospital discharge records (HDR) including age, gender, codes of interventions applied, ICD codes of diagnosed disorders of patients admitted between 01/01/2004 and 31/12/2010 with the diagnosis of intracranial injury (S06 by ICD10) from every inpatient institution in Hungary were collected from the database of National Health Insurance Fund (NHIF). The Case Fatality Ratios (CFR) for one week, one month and six months were calculated for the periods before and after the guideline introduction. The change of CFRs was applied as indicators for change of clinical quality elicited by the guideline. The centers together at one week, one month and six months had pre-guideline introduction CFRs of 23.4%, 37.7% and 47.5% and post-guideline introduction CFRs of 22.1%, 39.1%, and 50.0% respectively. The secondary institutions together at one week, one month and six months had pre-guideline introduction CFRs of 21.5%, 34.8% and 46.3% and post-guideline introduction CFRs of 21.9%, 37.0%, and 48.9% respectively. None of the CFRs showed significant change. The effectiveness of TBI management guideline adaptation in Hungary is poor. Without supportive financing and external auditing system, guideline introduction alone cannot achieve standard clinical practice and a reduction in CFR.

  18. Forest residues management guidelines for the Pacific Northwest.

    Science.gov (United States)

    John M. Pierovich; Edward H. Clarke; Stewart G. Pickford; Franklin R. Ward

    1975-01-01

    Forest residues often require treatment to meet land management objectives. Guideline statements for managing forest residues are presented to provide direction for achieving these objectives. The latest research information and the best knowledge of experts in various land management disciplines were used to formulate these statements. A unique keying system is...

  19. Communication Management Guidelines for Software Organizations in Pakistan with clients from Afghanistan

    Science.gov (United States)

    Arif Shah, Muhammad; Hashim, Rathiah; Shah, Adil Ali; Farooq Khattak, Umar

    2016-11-01

    Developing software through Global Software Development (GSD) became very common now days in the software industry. Pakistan is one of the countries where projects are taken and designed from different countries including Afghanistan. The purpose of this paper is to identify and provide an analysis on several communication barriers that can have a negative impact on the project and to provide management guidelines for medium size software organizations working in Pakistan with clients from Afghanistan and to overcome these communication barriers and challenges organizations face when coordinating with client. Initially we performed a literature review to identify different communication barriers and to check if there are any standardized communications management guidelines for medium size software houses provided in the past. The second stage of the research paper involves guidelines with vendor's perspective that include interviews and focus group discussions with different stakeholders and employees of software houses with clients from Afghanistan. Based on those interviews and discussions we established communication management guidelines in order to overcome the communication problems and barriers working with clients from Afghanistan. As a result of the literature review, we have identified that barriers such as cultural barriers and language barrier were one of the main reasons behind the project failure and suggested that software organizations working in Pakistan should follow certain defined communication guidelines in order to overcome communication barriers that affect the project directly.

  20. Agile project management managing for success

    CERN Document Server

    Crowder, James A

    2015-01-01

    Management and enables them to deal with the demands and complexities of modern, agile systems/software/hardware development teams. The book examines the project/program manager beyond the concepts of leadership and aims to connect to employees' sense of identity. The text examines human psychological concepts such as "locus of control," which will help the manager understand their team members' view and how best to manage their "world" contributions. The authors cover new management tools and philosophies for agile systems/software/hardware development teams, with a specific focus on how this

  1. Knowledge Model: Project Knowledge Management

    DEFF Research Database (Denmark)

    Durao, Frederico; Dolog, Peter; Grolin, Daniel

    2009-01-01

    The Knowledge model for project management serves several goals:Introducing relevant concepts of project management area for software development (Section 1). Reviewing and understanding the real case requirements from the industrial perspective. (Section 2). Giving some preliminary suggestions...... for usage in KIWI system (Sections 3). This document is intended for technological partners to understand how for example the software development concepts can be applied to a semantic wiki framework....

  2. Towards rethinking Project portfolio management

    DEFF Research Database (Denmark)

    Hansen, Lars Kristian; Svejvig, Per

    the last five years. Utilizing the theoretical lens proposed by Svejvig and Andersen (2015), we apply two complementary analytical perspectives to classify and analyze the stocks. One perspective, denoted as classical project management (CPM), highlights key characteristics of conventional research....... A second perspective, denoted as rethinking project management (RPM), highlights characteristics of progressive research. Not surprisingly, characteristics from CPM are very dominant in the stock of most cited publications of all years — instrumentality and controllability in particular. In the newest...

  3. Adherence to management guidelines for childhood asthma in Australia.

    Science.gov (United States)

    Bereznicki, Bonnie J; Beggs, Sean; Duff, Caitlin; Bereznicki, Luke

    2015-12-01

    Little is known about doctors' treatment preferences for childhood asthma. The aim of this study was to investigate adherence to management guidelines for childhood asthma. One thousand general practitioners (GPs) and paediatric specialists in Australia were invited to take part in a survey, which collected demographic details and explored their familiarity with and adherence to childhood asthma management guidelines. Two hundred doctors (20% response rate) responded and were eligible for inclusion in the survey. Approximately half (54.5%) of the respondents were very familiar with at least one of the childhood asthma management guidelines. The majority of respondents (86.8%) followed guideline recommendations when prescribing initial maintenance therapy for childhood asthma, while 89.2% and 68.0% followed guideline recommendations regarding step-up and step-down therapy respectively. Overall familiarity with childhood asthma management guidelines could be improved. There is scope for improvement in the adherence to these guidelines when prescribing medication in childhood asthma, particularly for step-down therapy.

  4. RISK MANAGEMENT USING PROJECT RECON

    Science.gov (United States)

    2016-11-28

    centralized database . • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any...Create growth plans to proactively capture benefits • Customize reports to group opportunities by programmatic, technical, business, contracting, and

  5. Preparing strategic information management plans for hospitals: a practical guideline SIM plans for hospitals: a guideline.

    Science.gov (United States)

    Brigl, B; Ammenwerth, E; Dujat, C; Gräber, S; Grosse, A; Häber, A; Jostes, C; Winter, A

    2005-01-01

    Systematic information management in hospitals demands for a strategic information management plan (SIM plan). As preparing a SIM plan is a considerable challenge we provide a practical guideline that is directly applicable when a SIM plan is going to be prepared. The guideline recommends a detailed structure of a SIM plan and gives advice about its content and the preparation process. It may be used as template, which can be adapted to the individual demands of any hospital. The guideline was used in several hospitals preparing a SIM plan. Experiences showed that the SIM plans could be prepared very efficiently and timely using the guideline, that the proposed SIM plan structure suited well, that the guideline offers enough flexibility to meet the requirements of the individual hospitals and that the specific recommendations of the guideline were very helpful. Nevertheless, we must strive for a more comprehensive theory of strategic information management planning which -- in the sense of enterprise architecture planning -- represents the intrinsic correlations of the different parts of a SIM plan to a greater extent.

  6. Management Of Building Projects

    OpenAIRE

    Niko Majdandzic; Tadija Lovric; Vido Peric

    2006-01-01

    In this work we have shown the concept of logistic support in management in building production and in building of objects, which is realised in Enterprise resource Planning – ERP system ERPINSG, developed in Informatic firm Informatic engineering – ININ in Slavonski Brod, and in cooperation with scientists of catedra for informatics of Faculty of Mechanical Engineering and users from building firms.

  7. Integrated Guidelines for Management of Alloy 600 Locations

    Energy Technology Data Exchange (ETDEWEB)

    Na, Kyung-Hwan; Chung, Hansub; Yang, Jun-Seog; Lee, Kyoung-Soo [KHNP-Central Research Institute, Daejeon (Korea, Republic of)

    2015-05-15

    The locations experiencing PWSCC include steam generator tubes, pressurizer instrumental nozzles, control rod driving mechanism(CRDM) penetration nozzles, reactor outlet nozzles, and bottom mounted instrumental(BMI) nozzles. Korea Hydro and Nuclear Power Co.(KHNP) has developed integrated guidelines for management of alloy 600 locations and the guidelines are under review by the regulator. The guidelines consist of alloy 600 location database, inspection program, maintenance/preventive maintenance method, and finally water chemistry management for PWSCC mitigation. In this paper, the detailed contents are presented. The integrated guidelines collected all relevant information on the management of alloy 600 locations. This information may be useful for establishing the most effective preventive maintenance strategies by prioritization in addition to maintenance strategies. Table II summarize maintenance strategies for alloy 600 locations.

  8. Labour management guidelines for a Tanzanian referral hospital

    DEFF Research Database (Denmark)

    Maaløe, Nanna; Housseine, Natasha; van Roosmalen, Jos

    2017-01-01

    hospital, this paper describes the development process of locally achievable, partograph-associated, and peer-reviewed labour management guidelines, and it presents an assessment of professional birth attendants’ perceptions. Methods: Part 1: Modification of evidence-based international guidelines through...... by staff and two external peer-review cycles, there were no major concerns with the guidelines internally nor externally. Thereby, international recommendations were condensed to the eight-paged ‘PartoMa guidelines ©’. This pocket booklet includes routine assessments, supportive care, and management......, locally achievable, and acceptable support for intrapartum surveillance, triage, and management. This is a crucial example of adapting evidence-based international recommendations to local reality. Trial registration: This paper describes the intervention of the PartoMa trial, which is registered...

  9. Strategic Management of Large Projects

    Institute of Scientific and Technical Information of China (English)

    WangYingluo; LiuYi; LiYuan

    2004-01-01

    The strategic management of large projects is both theoretically and practically important. Some scholars have advanced flexible strategy theory in China. The difference of strategic flexibility and flexible strategy is pointed out. The supporting system and characteristics of flexible strategy are analyzed. The changes of flexible strategy and integration of strategic management are discussed.

  10. Project management in crisis situations

    Directory of Open Access Journals (Sweden)

    Agnieszka Goździewska-Nowicka

    2017-05-01

    Full Text Available In today’s methodologies of project management attention is increasingly paid to the crises-related issues. Modern economy and the turbulent environment cause that an emergingcrisis can pose a serious threat to the implementation of any undertaking. This article focuses on the presentation of the conditions and causes of crisis situations, the essence of projects, and their effective management. The major objective of the paper, however, is to demonstrate how companies implementing projects cope with the occurrence of a crisis situation.

  11. NDMA guidelines on management of nuclear and radiological emergencies

    International Nuclear Information System (INIS)

    Abani, M.C.

    2011-01-01

    The National Disaster Management Authority (NDMA), ever since it's formation as an apex policy making body for the country in the field of disaster management, has formulated a set of guidelines to assist the various ministries, states and stakeholders in preparing their plans to handle different types of disasters. The guidelines on management of nuclear and radiological emergencies assume great importance in the present context, as our country has very ambitious programme to exploit nuclear energy for peaceful uses. Though, we have an enviable and impeccable record of safety and virtually fail-safe operations in all our nuclear establishments, the possibility, however, remote it may be, of human error, systems failure, sabotage, earthquake, floods, terrorist attacks etc leading to the release of radioactive material in the public domain, cannot be entirely ruled out. With this view, it was decided to prepare the national guidelines by NDMA to manage any nuclear/radiological emergency in public domain. Through these guidelines, we aim to further strengthen our existing nuclear/radiological emergency management framework and generate public awareness, which will go a long way in allaying misapprehensions, if any, amongst the public about the country's nuclear programme. Like in all our guidelines for handling of different types of the disasters, in these Guidelines also, maximum emphasis has been laid on the prevention of nuclear and radiological emergencies, along with a detailed consideration of all other elements of the disaster management continuum. The national guidelines have been prepared and a consensus was arrived on various issues, after widespread consultations and elaborates discussions amongst experts as well as stakeholders. It is assumed that once these guidelines are implemented by the stakeholders and converted into action plans followed by SOPs that will further reduce the chances of accidents in the nuclear arena. (author)

  12. [Guidelines for management of epilepsy--commentary on Scottish ("SIGN") guidelines].

    Science.gov (United States)

    Planjar-Prvan, Miljenka; Granić, Davorka

    2005-01-01

    The choice of AED (antiepileptic drug), worldwide and in Croatia, is been still based on the physician's subjective decision, personal experience, knowledge and marketing pressure made by big pharmaceutical industries. Therefore, according to some opinions, there is a need of treatment guidelines for epilepsy that would provide relevant information based on scientific evidence on the efficacy, tolerability and safety of AEDs. The guidelines, published by a competent source, should be designed as to allow for easy access to the information on the best practice in specific cases. An extensive background literature review was made to identify such a type of guidelines for the management of epilepsy. The literature review revealed a number of references with the recommendations for treating epilepsy in different groups of patients and from various, specific aspects of epilepsy treatment. However, only one comprehensive set of guidelines for the diagnosis and treatment of epilepsy treatment was found, i.e. the evidence-based guidelines published by the Scottish Intercollegiate Guidelines Network (SIGN). The development of this set of guidelines is quite extensively described in order to illustrate how rigorous and long-lasting the process was, including a great number of health professionals at the national level. Such a type of well designed guidelines facilitates access to highest educational standards for all professionals involved in the primary and secondary care of people with epilepsy. However, it is clear that guidelines can fully replace the standards of clinical practice based on critical evaluation and integration of all clinical data of each individual patient. No guidelines can replace the physician's obligation to keep informed of the novel achievements in the epileptology either.

  13. Document Management Projects: implementation guide

    OpenAIRE

    Beatriz Bagoin Guimarães

    2016-01-01

    Records Management System implementation is a complex process that needs to be executed by a multidisciplinary team and involves components of apparently non-related areas such as archival science, computer engineering, law, project management and human resource management. All of them are crucial and complementary to guarantee a full and functional implementation of a system and a perfect fusion with the connected processes and procedures. The purpose of this work is to provide organizations...

  14. Waste Management Project Contingency Analysis

    International Nuclear Information System (INIS)

    Edward L. Parsons, Jr.

    1999-01-01

    The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion

  15. Impact evaluation of productive use—An implementation guideline for electrification projects

    International Nuclear Information System (INIS)

    Bensch, Gunther; Peters, Jörg; Schmidt, Christoph M.

    2012-01-01

    There is a consensus in the international community that rural electrification and, in particular, the productive use of electricity contributes to poverty alleviation. At the same time, efforts to evaluate the impacts of development projects have increased substantially. This paper provides a hands-on guide for designing evaluation studies regarding the impacts of productive electricity usage. Complementary to the existing literature on evaluation methods, this guide familiarizes project managers with the concrete steps that have to be undertaken to plan and implement an evaluation. The guide comprises three modules based on enterprise surveys and on anecdotal case studies. For each module, the implementation is described on a step-by-step basis including conceptual issues as well as logistics and methodological questions. - Highlights: ► Hands-on evaluation guideline for development project managers. ► Step-by-step procedure on how to implement evaluation. ► Impacts of productive electricity use.

  16. Document Management Projects: implementation guide

    Directory of Open Access Journals (Sweden)

    Beatriz Bagoin Guimarães

    2016-12-01

    Full Text Available Records Management System implementation is a complex process that needs to be executed by a multidisciplinary team and involves components of apparently non-related areas such as archival science, computer engineering, law, project management and human resource management. All of them are crucial and complementary to guarantee a full and functional implementation of a system and a perfect fusion with the connected processes and procedures. The purpose of this work is to provide organizations with a basic guide to Records Management Project implementation beginning with the steps prior to acquiring the system, following with the main project activities and concluding with the post implementation procedures of continuous improvement and system maintenance.

  17. Integrated project management type contracts

    International Nuclear Information System (INIS)

    Heisler, S.I.

    1975-01-01

    The concept of integrated project management represents a single source to which the owner can turn for all project management functions excepting for those relating to outside parties such as site purchase, personnel selection etc. Other functions such as design, procurement, construction management, schedule and cost control, quality assurance/quality control are usually handled by the integrated project manager as the agent of the owner. The arrangement is flexible and the responsibilities can be varied to suit the size and experience of the owner. Past experience in the United States indicates an increase in the trend toward IPM work and it appears that overseas this trend is developing also. (orig./RW) [de

  18. Planning and Managing Drupal Projects

    CERN Document Server

    Nordin, Dani

    2011-01-01

    If you're a solo website designer or part of a small team itching to build interesting projects with Drupal, this concise guide will get you started. Drupal's learning curve has thrown off many experienced designers, particularly the way it handles design challenges. This book shows you the lifecycle of a typical Drupal project, with emphasis on the early stages of site planning. Learn how to efficiently estimate and set up your own project, so you can focus on ways to make your vision a reality, rather than let project management details constantly distract you. Plan and estimate your projec

  19. IAEA guidance on ageing management for nuclear power plants. Guidance on effective management of the physical ageing of systems, structures and components important to safety for nuclear power plants. Overview. Programmatic guidelines. Component specific guidelines. Review guidelines. Version 1, 2002

    International Nuclear Information System (INIS)

    2002-01-01

    Operational experience shows that excellent plant safety and excellent performance go hand in hand, and that they are achieved by effective leadership and management that includes a unified approach to safety and production. This is also applicable to ageing management. Effective ageing management leads to both enhanced plant safety and enhanced performance and is a prerequisite for long service life. The IAEA project on Safety Aspects of NPP Ageing has produced since 1990 a comprehensive set of programmatic and component specific guidelines on managing ageing, while providing an interactive environment for information exchange and co-operation among practitioners, and has assisted Member States in the application of the guidelines through the provision of training and advice. The objective of the CD-ROM is to preserve the IAEA's guidance on ageing management and to facilitate its retrieval, updating, extension and dissemination in order to help increase the effectiveness of ageing management at nuclear power plants

  20. Conceptualizing Knowledge Communication for Project Management

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    2015-01-01

    In the field of project management, the search for better ways to manage projects is ongoing. One of the more recent trends in the literature focuses on the integration of knowledge management in project management environments. Advantages of integrating knowledge management into projects can be ...... knowledge for project management, this paper focuses on extending Knowledge Management to include concepts related to communicating knowledge from the fields of rhetoric, knowledge communication, and corporate communication....

  1. Managing project risks and uncertainties

    Directory of Open Access Journals (Sweden)

    Mike Mentis

    2015-01-01

    Full Text Available This article considers threats to a project slipping on budget, schedule and fit-for-purpose. Threat is used here as the collective for risks (quantifiable bad things that can happen and uncertainties (poorly or not quantifiable bad possible events. Based on experience with projects in developing countries this review considers that (a project slippage is due to uncertainties rather than risks, (b while eventuation of some bad things is beyond control, managed execution and oversight are still the primary means to keeping within budget, on time and fit-for-purpose, (c improving project delivery is less about bigger and more complex and more about coordinated focus, effectiveness and developing thought-out heuristics, and (d projects take longer and cost more partly because threat identification is inaccurate, the scope of identified threats is too narrow, and the threat assessment product is not integrated into overall project decision-making and execution. Almost by definition, what is poorly known is likely to cause problems. Yet it is not just the unquantifiability and intangibility of uncertainties causing project slippage, but that they are insufficiently taken into account in project planning and execution that cause budget and time overruns. Improving project performance requires purpose-driven and managed deployment of scarce seasoned professionals. This can be aided with independent oversight by deeply experienced panelists who contribute technical insights and can potentially show that diligence is seen to be done.

  2. Multidisplinary Engineering, Project, and Production Management

    Directory of Open Access Journals (Sweden)

    Chien-Ho Ko

    2012-01-01

    Full Text Available Journal of Engineering, Project, and Production Management (EPPM-Journal reflect the journal’s multidisciplinary approach to management research and can be categorized as belonging to three general topics: Project Management, Engineering and Project Management, and Project and Production Management.

  3. 7 CFR 3565.351 - Project management.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  4. Multidisplinary Engineering, Project, and Production Management

    OpenAIRE

    Chien-Ho Ko

    2012-01-01

    Journal of Engineering, Project, and Production Management (EPPM-Journal) reflect the journal’s multidisciplinary approach to management research and can be categorized as belonging to three general topics: Project Management, Engineering and Project Management, and Project and Production Management.

  5. Landfill gas management facilities design guidelines

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-03-15

    In British Columbia, municipal solid waste landfills generate over 1000 tonnes of methane per year; landfill gas management facilities are required to improve the environmental performance of solid waste landfills. The aim of this document, developed by the British Columbia Ministry of the Environment, is to provide guidance for the design, installation, and operation of landfill gas management facilities to address odor and pollutant emissions issues and also address health and safety issues. A review of technical experience and best practices in landfill gas management facilities was carried out, as was as a review of existing regulations related to landfill gas management all over the world. This paper provides useful information to landfill owners, operators, and other professionals for the design of landfill gas management facilities which meet the requirements of landfill gas management regulations.

  6. Unmet needs in obesity management: From guidelines to clinic.

    Science.gov (United States)

    Ritten, Angela; LaManna, Jacqueline

    2017-10-01

    Despite the rather slow acceptance of obesity as a disease state, several obesity staging systems and weight-management guidelines have been developed and are in use, along with an ever-growing number of treatment options. Many primary care clinicians, including nurse practitioners (NPs), are at the forefront of clinical efforts to assist individuals with obesity, but face challenges due to lack of alignment and consensus among the various staging systems and guidelines. This is further complicated by shortfalls in clinical training related to obesity management and increasing complexities in reimbursement for obesity-related services. Unmet needs in the management of obesity thus stretch from guidelines to clinic. This article examines the principal barriers to effective management of individuals with obesity and considers how concerns might be overcome, with particular emphasis on the role of the NP. ©2017 American Association of Nurse Practitioners.

  7. A Guideline for Marine Corps Financial Managers

    National Research Council Canada - National Science Library

    Wright, Anthone

    1998-01-01

    ...), and Marine Corps orders, publications and directives to determine those keys areas considered most essential to Marine Corps financial management specialists in the performance of their duties...

  8. MANAGING LARGE INVESTMENT PROJECTS IN GORJ

    Directory of Open Access Journals (Sweden)

    CÎRNU DORU

    2016-12-01

    Full Text Available Currently, the concept of project management is considered to be the best concept for efficient management of a project, so it is used all over the world, and most recently in our country. This concept is designed with all the general characteristics of project management, but adapted to the large investment projects. This paper presents the project management concept and project management organization for capital projects. This concept is conceived with all general characteristics of project management, but adopted to the condition of large investment projects. The concept also includes the project team and the project manager, the person authorized and responsible for achieving the objectives planned in the project. For efficient managing by project, it is necessary to insure a good compozition of project team, as a team of people who, in collaboration with project manager, work directly on managing the project. To effectively manage the project, it is necessary to ensure a proper composition of the project team, a team of people who, in collaboration with the project manager to work directly for project management. It is a particularly good method of achieving the objectives planned projects, which means a project with a certain level of performance required in a planned time, with planned costs.

  9. European guidelines on management of restless legs syndrome

    DEFF Research Database (Denmark)

    Garcia-Borreguero, Diego; Ferini-Strambi, Luigi; Kohnen, Ralf

    2012-01-01

    Since the publication of the first European Federation of Neurological Societies (EFNS) guidelines in 2005 on the management of restless legs syndrome (RLS; also known as Willis-Ekbom disease), there have been major therapeutic advances in the field. Furthermore, the management of RLS is now a pa...

  10. [Clinical practice guidelines and knowledge management in healthcare].

    Science.gov (United States)

    Ollenschläger, Günter

    2013-10-01

    Clinical practice guidelines are key tools for the translation of scientific evidence into everyday patient care. Therefore guidelines can act as cornerstones of evidence based knowledge management in healthcare, if they are trustworthy, and its recommendations are not biased by authors' conflict of interests. Good medical guidelines should be disseminated by means of virtual (digital/electronic) health libraries - together with implementation tools in context, such as guideline based algorithms, check lists, patient information, a.s.f. The article presents evidence based medical knowledge management using the German experiences as an example. It discusses future steps establishing evidence based health care by means of combining patient data, evidence from medical science and patient care routine, together with feedback systems for healthcare providers.

  11. German disease management guidelines: surgical therapies for chronic heart failure.

    Science.gov (United States)

    Sindermann, J R; Klotz, S; Rahbar, K; Hoffmeier, A; Drees, G

    2010-02-01

    The German Disease Management Guideline "Chronic Heart Failure" intends to guide physicians working in the field of diagnosis and treatment of heart failure. The guideline provides a tool on the background of evidence based medicine. The following short review wants to give insights into the role of some surgical treatment options to improve heart failure, such as revascularization, ventricular reconstruction and aneurysmectomy, mitral valve reconstruction, ventricular assist devices and heart transplantation. (c) Georg Thieme Verlag KG Stuttgart-New York.

  12. Software Support for the Classical, Contemporary and Future Project Management

    Directory of Open Access Journals (Sweden)

    Jakov Crnkovic

    2006-04-01

    Full Text Available The volume and complexity of Project Management (PM raises many questions for managers. What exactly are we managing? People? Performance? Efficiency? Effectiveness? Cost? Time? At what levels do projects become challenging and worthy of significant management attention? Can some projects be left on auto-pilot? Must others be managed more aggressively? What metrics are useful in Project Management? How can they be integrated with normal performance metrics in the organization? How can metrics be built into assessment programs that work? How can projects be monitored, re-planned to stay within the original budget and schedule deadlines? How good is the PM software support? Do we really need PM software packages or it should be the integral part of the company's information system (IS? Where is the knowledge about company's previous projects and performance? Are we able to establish company or even industry wide standards for project management? Can we (or should we move from the PMBOK® guidelines and use other approaches? We discussing important questions in PM: software products, responsibilities for concurrently executing several projects (multi-projects with multi objectives and multiple deadlines, introducing a need for initiation, design, execution, and control using a virtual project management and application of the organizational project maturity model.

  13. Project management at a university

    Science.gov (United States)

    Eaton, Joel A.

    2006-06-01

    Managing instrumentation projects, large or small, involves a number of common challenges-defining what is needed, desiging a system to provide it, producing it in an economical way, and putting it into service expeditiously. Doing these things in a university environoment provides unique challenges and opportunities not obtaining in the environment of large projects at NASA or national labs. I address this topic from the viewpoint of knowledge of two such projects, the development of OAO-2 at the University of Wisconsin and the relocation of Fairborn Observatory to the Patagonia Mountains in Arizona, as well as my own developemnt of the Tennessee State 2-m Automatic Spectroscopic Telescope. For the university environment, I argue for a more traditional management style that relies on more informal techniques than those used in large-scale projects conducted by big bureaucratic institutions. This style identifies what tasks are really necessary and eliminates as much wasteful overhead as possible. I discuss many of the formalities used in project management, such as formal reviews (PDR, CDR, etc.) and Gantt charts, and propose other ways of acheving the same results more effectively. The university environment acutely requires getting the right people to do the project, both in terms of their individual personalities, motivation, and technical skills but also in terms of their ability to get on with one another. Two critical challenges confronting those doing such projects in universities are 1) keeping the contractors on task (the major challenge to anyone doing project management) and 2) dealing with the purchasing systems in such institutions.

  14. Management of Software Development Projects

    Directory of Open Access Journals (Sweden)

    Felician ALECU

    2011-04-01

    Full Text Available Any major software development starts with the Initiating process group. Once the charter document is approved, the Planning and then to the Executing stages will follow. Monitoring and Controlling is measuring the potential performance deviation of the project in terms of schedule and costs and performs the related Integrated Change Control activities. At the end, during the Closing, the program/project manager will check the entire work is completed and the objectives are met.

  15. Project management plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2010-12-01

    The Dallas Integrated Corridor Management System Demonstration Project is a multi-agency, de-centralized operation which will utilize a set of regional systems to integrate the operations of the corridor. The purpose of the Dallas ICM System is to im...

  16. Project Management 2027; The Future of Project Management

    NARCIS (Netherlands)

    Drs. A.J.G. Silvius

    2008-01-01

    This paper describes a study into the expected development of the competences op the project manager in the year 2027. The study was performed amongst the members of IPMA-Netherlands during the summer of 2007. In the study the 46 competences of the International Competence Baseline 3 (ICB 3) were

  17. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  18. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  19. Project Management with IT Security Focus

    OpenAIRE

    Felician Alecu; Paul Pocatilu; Sergiu Capisizu

    2011-01-01

    The paper focus on the main key points related to the IT security project management. The most important lifecycle stages are identified: IT security project proposal definition, project organization, project planning, quality planning, project team organization, IT security project activities management and project closing. The most important success factors for IT security projects are the support of top-management, customer satisfaction, prevention over remediation and continuous progress....

  20. Birds and bird habitats: guidelines for wind power projects

    International Nuclear Information System (INIS)

    2010-10-01

    Established in 2009, the Green Energy Act aims to increase the use of renewable energy sources including wind, water, solar and bioenergy in Ontario. The development of these resources is a major component of the province's plan, which aims to mitigate the contribution to climate change and to involve the Ontario's economy in the improvement of the quality of the environment. The Green Energy Act also considers as important the implementation of a coordinated provincial approval process, suggesting the integration of all Ministry requirements into a unique process during the evaluation of newly proposed renewable energy projects. The Ministry of the Environment's Renewable Energy Approval Regulation details the requirements for wind power projects involving significant natural features. Birds are an important part of Ontario's biodiversity and, according to the Ministry of Natural Resources, their habitats are considered as significant wildlife habitat (SWH). The Renewable Energy Approval Regulation and this guideline are meant to provide elements and guidance in order to protect bird SWH during the selection of a location of wind power facilities. . 27 refs., 1 tab., 2 figs.

  1. Managing projects a team-based approach

    CERN Document Server

    Brown, Karen A

    2010-01-01

    Students today are likely to be assigned to project teams or to be project managers almost immediately in their first job. Managing Projects: A Team-Based Approach was written for a wide range of stakeholders, including project managers, project team members, support personnel, functional mangers who provide resources for projects, project customers (and customer representatives), project sponsors, project subcontractors, and anyone who plays a role in the project delivery process. The need for project management is on the rise as product life cycles compress, demand for IT systems increases, and business takes on an increasingly global character. This book adds to the project management knowledge base in a way that fills an unmet need—it shows how teams can apply many of the standard project management tools, as well as several tools that are relatively new to the field. Managing Projects: A Team-Based Approach offers the academic rigor found in most textbooks along with the practical attributes often foun...

  2. [The German National Disease Management Guideline "Chronic Heart Failure"].

    Science.gov (United States)

    Weinbrenner, S; Langer, T; Scherer, M; Störk, S; Ertl, G; Muth, Ch; Hoppe, U C; Kopp, I; Ollenschläger, G

    2012-02-01

    Chronic heart failure (CHF) is an illness mostly affecting elderly people. In Germany CHF is one of the most common causes of death and at the same time one of the most common diagnosis in inpatient care. Due to the expected increase in life expectancy in the next few years experts predict a further step-up of the incidence. Against this background development of a national guideline on chronic heart failure was prioritised and accordingly the National Disease Management Guideline (NDMG) Chronic Heart Failure was developed by a multi- and interdisciplinary group. The guideline group comprised experts from all relevant scientific medical societies as well as a patient expert. The National Disease Management Guideline (NDMG) on Chronic Heart Failure aims at supporting patients and health care providers with respect to decisions on a specific health care problem by giving recommendations for actions. Recommendations are informed by the best available scientific evidence on this topic.Patients with CHF often suffer from multiple conditions. Due to this fact and the old age patients do have very complex and demanding health care needs. Thus accounting for co-morbidities is paramount in planning and providing health care for theses patients and communication between doctor and patient but also between all health care providers is crucial.Basic treatment strategies in chronic heart failure comprise management of risk factors and prognostic factors as well as appropriate consideration of co-morbidities accompanied by measures empowering patients in establishing a healthy life style and a self-dependant management of their illness.Psycho-social aspects have a very strong influence on patients' acceptance of the disease and their self-management. In addition they have a strong influence on therapy management of the treating physician thus they have to be addressed adequately during the consultation.The National Disease Management Guideline (NDMG) Chronic Heart Failure (CHF

  3. How Project Managers Really Manage: An Indepth Look at Some Managers of Large, Complex NASA Projects

    Science.gov (United States)

    Mulenburg, Gerald M.; Impaeilla, Cliff (Technical Monitor)

    2000-01-01

    This paper reports on a research study by the author that examined ten contemporary National Aeronautics and Space Administration (NASA) complex projects. In-depth interviews with the project managers of these projects provided qualitative data about the inner workings of the project and the methodologies used in establishing and managing the projects. The inclusion of a variety of space, aeronautics, and ground based projects from several different NASA research centers helped to reduce potential bias in the findings toward any one type of project, or technical discipline. The findings address the participants and their individual approaches. The discussion includes possible implications for project managers of other large, complex, projects.

  4. Software Tools Streamline Project Management

    Science.gov (United States)

    2009-01-01

    Three innovative software inventions from Ames Research Center (NETMARK, Program Management Tool, and Query-Based Document Management) are finding their way into NASA missions as well as industry applications. The first, NETMARK, is a program that enables integrated searching of data stored in a variety of databases and documents, meaning that users no longer have to look in several places for related information. NETMARK allows users to search and query information across all of these sources in one step. This cross-cutting capability in information analysis has exponentially reduced the amount of time needed to mine data from days or weeks to mere seconds. NETMARK has been used widely throughout NASA, enabling this automatic integration of information across many documents and databases. NASA projects that use NETMARK include the internal reporting system and project performance dashboard, Erasmus, NASA s enterprise management tool, which enhances organizational collaboration and information sharing through document routing and review; the Integrated Financial Management Program; International Space Station Knowledge Management; Mishap and Anomaly Information Reporting System; and management of the Mars Exploration Rovers. Approximately $1 billion worth of NASA s projects are currently managed using Program Management Tool (PMT), which is based on NETMARK. PMT is a comprehensive, Web-enabled application tool used to assist program and project managers within NASA enterprises in monitoring, disseminating, and tracking the progress of program and project milestones and other relevant resources. The PMT consists of an integrated knowledge repository built upon advanced enterprise-wide database integration techniques and the latest Web-enabled technologies. The current system is in a pilot operational mode allowing users to automatically manage, track, define, update, and view customizable milestone objectives and goals. The third software invention, Query

  5. Business Principles and Management. Curriculum Guidelines.

    Science.gov (United States)

    Clemson Univ., SC. Vocational Education Media Center.

    This senior high school curriculum guide offers a general overview of the American business system and a study of various forms of business ownership, internal organization and management functions of business, and the financing of business. Ten areas are explored in the course: (1) capitalism; (2) money, credit, and banking; (3) government and…

  6. Forest management guidelines for controlling wild grapevines

    Science.gov (United States)

    H. Clay Smith

    1984-01-01

    Grapevines (Vitis spp.) are becoming a major problem to forest managers in the Appalachians, especially when clearcutting is done on highly productive hardwood sites. Where present, grapevines can reduce tree quality and growth, and eventually kill the tree. Silvical characteristics of grapevines are discussed as background for grapevine control....

  7. Project management as steppingstone of enterprises

    OpenAIRE

    Andreeva, T.; Petrovska, T.; Tytar, T.

    2011-01-01

    Actual problems of project management in enterprises in order to achieve their goals. The basic members of the organization and implementation of project and the methodology for their implementation. The basic principles of project management are included.

  8. PROJECT MANAGEMENT CONSIDERED IN A 2014 PERSPECTIVE

    Directory of Open Access Journals (Sweden)

    GRAPĂ ADELINA-ROXANA

    2014-05-01

    Full Text Available Project Management has come of age, yet multiple surveys and reports confirm the fact that the majority of projects are challenged. Given the more demanding and strict financial constraints associated with the current fiscal climate, project management is regarded as a tool that can deliver more with less. The literature on Project Management shows that, in spite of advancement in Project Management processes, tools and systems, project success has not significantly improved. This problem raises questions about the value and effectiveness of Project Management and Project Management systems. Programs and projects are considered as strategic assets for the majority of businesses, therefore, the trend of these organizations is to embrace a management by projects culture. The main objective of Project Management nowadays is to ensure programs and projects aligned to a certain strategy and also to provide for every member of an organization the ability to take proactive actions creating additional benefits.

  9. European Guidelines for Obesity Management in Adults

    Directory of Open Access Journals (Sweden)

    Volkan Yumuk

    2015-12-01

    Full Text Available Obesity is a chronic metabolic disease characterised by an increase of body fat stores. It is a gateway to ill health, and it has become one of the leading causes of disability and death, affecting not only adults but also children and adolescents worldwide. In clinical practice, the body fatness is estimated by BMI, and the accumulation of intra-abdominal fat (marker for higher metabolic and cardiovascular disease risk can be assessed by waist circumference. Complex interactions between biological, behavioural, social and environmental factors are involved in regulation of energy balance and fat stores. A comprehensive history, physical examination and laboratory assessment relevant to the patient's obesity should be obtained. Appropriate goals of weight management emphasise realistic weight loss to achieve a reduction in health risks and should include promotion of weight loss, maintenance and prevention of weight regain. Management of co-morbidities and improving quality of life of obese patients are also included in treatment aims. Balanced hypocaloric diets result in clinically meaningful weight loss regardless of which macronutrients they emphasise. Aerobic training is the optimal mode of exercise for reducing fat mass while a programme including resistance training is needed for increasing lean mass in middle-aged and overweight/obese individuals. Cognitive behavioural therapy directly addresses behaviours that require change for successful weight loss and weight loss maintenance. Pharmacotherapy can help patients to maintain compliance and ameliorate obesity-related health risks. Surgery is the most effective treatment for morbid obesity in terms of long-term weight loss. A comprehensive obesity management can only be accomplished by a multidisciplinary obesity management team. We conclude that physicians have a responsibility to recognise obesity as a disease and help obese patients with appropriate prevention and treatment. Treatment

  10. European Guidelines for Obesity Management in Adults

    Science.gov (United States)

    Yumuk, Volkan; Tsigos, Constantine; Fried, Martin; Schindler, Karin; Busetto, Luca; Micic, Dragan; Toplak, Hermann

    2015-01-01

    Obesity is a chronic metabolic disease characterised by an increase of body fat stores. It is a gateway to ill health, and it has become one of the leading causes of disability and death, affecting not only adults but also children and adolescents worldwide. In clinical practice, the body fatness is estimated by BMI, and the accumulation of intra-abdominal fat (marker for higher metabolic and cardiovascular disease risk) can be assessed by waist circumference. Complex interactions between biological, behavioural, social and environmental factors are involved in regulation of energy balance and fat stores. A comprehensive history, physical examination and laboratory assessment relevant to the patient's obesity should be obtained. Appropriate goals of weight management emphasise realistic weight loss to achieve a reduction in health risks and should include promotion of weight loss, maintenance and prevention of weight regain. Management of co-morbidities and improving quality of life of obese patients are also included in treatment aims. Balanced hypocaloric diets result in clinically meaningful weight loss regardless of which macronutrients they emphasise. Aerobic training is the optimal mode of exercise for reducing fat mass while a programme including resistance training is needed for increasing lean mass in middle-aged and overweight/obese individuals. Cognitive behavioural therapy directly addresses behaviours that require change for successful weight loss and weight loss maintenance. Pharmacotherapy can help patients to maintain compliance and ameliorate obesity-related health risks. Surgery is the most effective treatment for morbid obesity in terms of long-term weight loss. A comprehensive obesity management can only be accomplished by a multidisciplinary obesity management team. We conclude that physicians have a responsibility to recognise obesity as a disease and help obese patients with appropriate prevention and treatment. Treatment should be based on

  11. European Guidelines for Obesity Management in Adults.

    Science.gov (United States)

    Yumuk, Volkan; Tsigos, Constantine; Fried, Martin; Schindler, Karin; Busetto, Luca; Micic, Dragan; Toplak, Hermann

    2015-01-01

    Obesity is a chronic metabolic disease characterised by an increase of body fat stores. It is a gateway to ill health, and it has become one of the leading causes of disability and death, affecting not only adults but also children and adolescents worldwide. In clinical practice, the body fatness is estimated by BMI, and the accumulation of intra-abdominal fat (marker for higher metabolic and cardiovascular disease risk) can be assessed by waist circumference. Complex interactions between biological, behavioural, social and environmental factors are involved in regulation of energy balance and fat stores. A comprehensive history, physical examination and laboratory assessment relevant to the patient's obesity should be obtained. Appropriate goals of weight management emphasise realistic weight loss to achieve a reduction in health risks and should include promotion of weight loss, maintenance and prevention of weight regain. Management of co-morbidities and improving quality of life of obese patients are also included in treatment aims. Balanced hypocaloric diets result in clinically meaningful weight loss regardless of which macronutrients they emphasise. Aerobic training is the optimal mode of exercise for reducing fat mass while a programme including resistance training is needed for increasing lean mass in middle-aged and overweight/obese individuals. Cognitive behavioural therapy directly addresses behaviours that require change for successful weight loss and weight loss maintenance. Pharmacotherapy can help patients to maintain compliance and ameliorate obesity-related health risks. Surgery is the most effective treatment for morbid obesity in terms of long-term weight loss. A comprehensive obesity management can only be accomplished by a multidisciplinary obesity management team. We conclude that physicians have a responsibility to recognise obesity as a disease and help obese patients with appropriate prevention and treatment. Treatment should be based on

  12. UK national guidelines on the management of syphilis 2015.

    Science.gov (United States)

    Kingston, M; French, P; Higgins, S; McQuillan, O; Sukthankar, A; Stott, C; McBrien, B; Tipple, C; Turner, A; Sullivan, A K; Radcliffe, Keith; Cousins, Darren; FitzGerald, Mark; Fisher, Martin; Grover, Deepa; Higgins, Stephen; Kingston, Margaret; Rayment, Michael; Sullivan, Ann

    2016-05-01

    These guidelines are an update for 2015 of the 2008 UK guidelines for the management of syphilis. The writing group have piloted the new BASHH guideline methodology, notably using the GRADE system for assessing evidence and making recommendations. We have made significant changes to the recommendations for screening infants born to mothers with positive syphilis serology and to facilitate accurate and timely communication between the teams caring for mother and baby we have developed a birth plan. Procaine penicillin is now an alternative, not preferred treatment, for all stages of syphilis except neurosyphilis, but the length of treatment for this is shortened. Other changes are summarised at the start of the guideline. © The Author(s) 2016.

  13. 44 CFR 206.438 - Project management.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for project...

  14. PROJECT MANAGEMENT CONSIDERED IN A 2014 PERSPECTIVE

    OpenAIRE

    GRAPA ADELINA-ROXANA; SOARE ALICE-MAGDALENA

    2014-01-01

    Project Management has come of age, yet multiple surveys and reports confirm the fact that the majority of projects are challenged. Given the more demanding and strict financial constraints associated with the current fiscal climate, project management is regarded as a tool that can deliver more with less. The literature on Project Management shows that, in spite of advancement in Project Management processes, tools and systems, project success has not significantly improved. T...

  15. Risk Management of NASA Projects

    Science.gov (United States)

    Sarper, Hueseyin

    1997-01-01

    Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

  16. ORGEST: Regional guidelines and silvicultural models for sustainable forest management

    Energy Technology Data Exchange (ETDEWEB)

    Piqué, Míriam; Vericat, Pau; Beltrán, Mario

    2017-11-01

    Aim of the study: To develop regional guidelines for sustainable forest management. Area of the study: Forests of Catalonia (NE Spain). Material and methods: The process of developing the forest management guidelines (FMG) started by establishing a thorough classification of forest types at stand level. This classification hinges on two attributes: tree species composition and site quality based on ecological variables, which together determine potential productivity. From there, the management guidelines establish certain objectives and silvicultural models for each forest type. The forest type classifications, like the silvicultural models, were produced using both existing and newly-built growth models based on data from the National Forest Inventory (NFI) and expert knowledge. The effort involved over 20 expert working groups in order to better integrate the expertise and vision of different sectorial agents. Main results: The FMG consist in quantitative silvicultural models that include typical silvicultural variables, technical descriptions of treatments and codes of good practice. Guidelines now cover almost all forest types in Catalonia (spanning up to 90% of the Catalan forest area). Different silvicultural models have been developed for pure and mixed stands, different site quality classes (2–3 classes per species), and even- and multi-aged stands. Research highlights: FMG: i) orient the management of private and public forests, (ii) provide a technical scaffold for efficient allocation/investment of public subsidies in forest management, and (iii) bridge forest planning instruments at regional (strategic-tactical) and stand (operational) level.

  17. ORGEST: Regional guidelines and silvicultural models for sustainable forest management

    International Nuclear Information System (INIS)

    Piqué, Míriam; Vericat, Pau; Beltrán, Mario

    2017-01-01

    Aim of the study: To develop regional guidelines for sustainable forest management. Area of the study: Forests of Catalonia (NE Spain). Material and methods: The process of developing the forest management guidelines (FMG) started by establishing a thorough classification of forest types at stand level. This classification hinges on two attributes: tree species composition and site quality based on ecological variables, which together determine potential productivity. From there, the management guidelines establish certain objectives and silvicultural models for each forest type. The forest type classifications, like the silvicultural models, were produced using both existing and newly-built growth models based on data from the National Forest Inventory (NFI) and expert knowledge. The effort involved over 20 expert working groups in order to better integrate the expertise and vision of different sectorial agents. Main results: The FMG consist in quantitative silvicultural models that include typical silvicultural variables, technical descriptions of treatments and codes of good practice. Guidelines now cover almost all forest types in Catalonia (spanning up to 90% of the Catalan forest area). Different silvicultural models have been developed for pure and mixed stands, different site quality classes (2–3 classes per species), and even- and multi-aged stands. Research highlights: FMG: i) orient the management of private and public forests, (ii) provide a technical scaffold for efficient allocation/investment of public subsidies in forest management, and (iii) bridge forest planning instruments at regional (strategic-tactical) and stand (operational) level.

  18. Measurement of software project management effectiveness

    OpenAIRE

    Demir, Kadir Alpaslan

    2008-01-01

    Approved for public release; distribution is unlimited. Evaluating, monitoring, and improving the effectiveness of project management can contribute to successful acquisition of software systems. In this dissertation, we introduce a quantitative metric for gauging the effectiveness of managing a software-development project. The metric may be used to evaluate and monitor project management effectiveness in software projects by project managers, technical managers, executive man...

  19. Solid low level waste management guidelines

    International Nuclear Information System (INIS)

    Saunders, P.

    1995-01-01

    In the 1980's the nuclear industry began focusing a great deal of attention on minimizing the volume of low level radioactive waste (LLW) that required disposal. This was driven by several factors including rising disposal costs, increased regulatory pressures, and increased pressure from other organizations such as INPO. In the 1990's most utilities are faced with intense competition in the electrical generation market. The survival of a utility is based on their ability to produce electricity by the most efficient and economical means available. Waste management related costs are a substantial portion of most utilities O ampersand M budgets. Disposal site access denial continues to be a major factor in waste management program decision, and the pressures to minimize waste volumes from outside organizations is greater than ever

  20. A critical appraisal of guidelines for the management of knee osteoarthritis using Appraisal of Guidelines Research and Evaluation criteria

    Science.gov (United States)

    Poitras, Stéphane; Avouac, Jérôme; Rossignol, Michel; Avouac, Bernard; Cedraschi, Christine; Nordin, Margareta; Rousseaux, Chantal; Rozenberg, Sylvie; Savarieau, Bernard; Thoumie, Philippe; Valat, Jean-Pierre; Vignon, Éric; Hilliquin, Pascal

    2007-01-01

    Clinical practice guidelines have been elaborated to summarize evidence related to the management of knee osteoarthritis and to facilitate uptake of evidence-based knowledge by clinicians. The objectives of the present review were summarizing the recommendations of existing guidelines on knee osteoarthritis, and assessing the quality of the guidelines using a standardized and validated instrument – the Appraisal of Guidelines Research and Evaluation (AGREE) tool. Internet medical literature databases from 2001 to 2006 were searched for guidelines, with six guidelines being identified. Thirteen clinician researchers participated in the review. Each reviewer was trained in the AGREE instrument. The guidelines were distributed to four groups of three or four reviewers, each group reviewing one guideline with the exception of one group that reviewed two guidelines. One independent evaluator reviewed all guidelines. All guidelines effectively addressed only a minority of AGREE domains. Clarity/presentation was effectively addressed in three out of six guidelines, scope/purpose and rigour of development in two guidelines, editorial independence in one guideline, and stakeholder involvement and applicability in none. The clinical management recommendation tended to be similar among guidelines, although interventions addressed varied. Acetaminophen was recommended for initial pain treatment, combined with exercise and education. Nonsteroidal anti-inflammatory drugs were recommended if acetaminophen failed to control pain, but cautiously because of gastrointestinal risks. Surgery was recommended in the presence of persistent pain and disability. Education and activity management interventions were superficially addressed in most guidelines. Guideline creators should use the AGREE criteria when developing guidelines. Innovative and effective methods of knowledge translation to health professionals are needed. PMID:18062805

  1. Project Management Yinyang: Coupling project success and client satisfaction

    Directory of Open Access Journals (Sweden)

    Greg Stewart Usher

    2017-06-01

    Full Text Available Our research applies paradox theory to a project management construct to help project management researchers and practitioners understand the tensions that can exist between project success and client satisfaction. Our research highlights that although project success and client satisfaction are both present within a project management construct, they also belong to different functional systems. Project success and client satisfaction have different systemic-discourses and use different language games to convey information. These distinctions can create latent and sometimes salient tensions within the project management construct that project managers must understand, embrace, and work with. We have used a Grounded Theory (GT methodology to explore the lived experience of project managers, and from this have identified a phenomenon which we have termed project management yinyang. Project management yinyang is the state that exists when both project success and Client satisfaction are tightly coupled within the project management construct. Project management yinyang highlights that these two phenomena cannot be viewed as separate elements because the ‘seed’ of each exists within the other. And to truly achieve one, you must also achieve the other. Our findings indicate that in order to create project management yinyang the project manager must embrace a paradoxical yet holistic philosophy. They must understand the complementarity, interdependency, and structural coupling that exists between the positivist and interpretivist paradigms within the project management construct. They must understand how satisfaction (Yin and success (Yang are created through focus. Furthermore, they must understand how project management yinyang is separate from, but borne from, the convergence of the other two elements.

  2. Guidelines for international plutonium management: Overview and implications

    International Nuclear Information System (INIS)

    Bryson, M.C.; Fitzgerald, C.P.; Kincaid, C.

    1998-01-01

    In September, 1997, nine of the world's plutonium-using countries agreed to a set of guidelines for international plutonium management, with acceptances to be submitted to the International Atomic Energy Agency on December 1. Following three years of discussion, the guidelines provide a unified package of accepted rules for the storage, handling, and transportation of civil plutonium as well as military plutonium that has been declared as no longer required for defense purposes. New requirements include a formal declaration of national plutonium strategies, which will recognize the environmental, economic, and proliferation concerns and the consequent importance of balancing plutonium supply and demand. Nations will also make annual declaration of their non-military stockpiles of unirradiated plutonium, together with estimates of the plutonium content in spent reactor fuel. These guidelines represent the first formally accepted recognition of the need for plutonium management of this scope and could thus provide a partial basis for future monitoring and policy regimes

  3. Real-world heart failure management in 10,910 patients with chronic heart failure in the Netherlands : Design and rationale of the Chronic Heart failure ESC guideline-based Cardiology practice Quality project (CHECK-HF) registry.

    Science.gov (United States)

    Brugts, J J; Linssen, G C M; Hoes, A W; Brunner-La Rocca, H P

    2018-05-01

    Data from patient registries give insight into the management of patients with heart failure (HF), but actual data from unselected real-world HF patients are scarce. Therefore, we performed a cross sectional study of current HF care in the period 2013-2016 among more than 10,000 unselected HF patients at HF outpatient clinics in the Netherlands. In 34 participating centres, all 10,910 patients with chronic HF treated at cardiology centres were included in the CHECK-HF registry. Of these, most (96%) were managed at a specific HF outpatient clinic. Heart failure was typically diagnosed according to the ESC guidelines 2012, based on signs, symptoms and structural and/or functional cardiac abnormalities. Information on diagnostics, treatment and co-morbidities were recorded, with specific focus on drug therapy and devices. In our cohort, the mean age was 73 years (SD 12) and 60% were male. Frequent co-morbidities reported in the patient records were diabetes mellitus 30%, hypertension 43%, COPD 19%, and renal insufficiency 58%. In 47% of the patients, ischaemia was the origin of HF. In our registry, the prevalence of HF with preserved ejection fraction was 21%. The CHECK-HF registry will provide insight into the current, real world management of patient with chronic HF, including HF with reduced ejection fraction, preserved ejection fraction and mid-range ejection fraction, that will help define ways to improve quality of care. Drug and device therapy and guideline adherence as well as interactions with age, gender and co-morbidities will receive specific attention.

  4. Guidelines on nitrogen management in agricultural systems

    International Nuclear Information System (INIS)

    2008-01-01

    This publication deals with the topic of nitrogen management in agro-ecosystems. Nitrogen (N) is an essential plant nutrient, and N deficiency severely restricts crop yields in most cultivated soils. Therefore, substantial N inputs are required for optimum plant growth and adequate food, feed and fibre production. Developing countries use more than 55 million metric tons (t) of N fertilizers at an estimated value of US $16 billion annually, of which approximately 2 million t are used in Africa, 5 in Latin America and 50 in Asia. It is estimated that adequate production of food (in particular cereals) for present and future populations will not be achieved without external inputs of fertilizer N. However, management practices involving fertilizer N should be efficient in order to optimize crop production while minimizing adverse effects on the environment. Moreover, the use of alternative N sources such as organic residues and biological nitrogen fixation should be increased within the context of integrated soil fertility management to ensure food security in areas of the world where fertilizer N is too expensive or simply not available. At present, legumes such as soybean, common bean, groundnuts, chickpeas, cowpeas, etc., are fixing approximately 11 million t of N in developing countries. This publication covers, concisely and comprehensively, key topics dealing with the utilization of all sources of N in farming systems, in particular to demonstrate to scientists in developing countries how isotopic tracer technologies can be used in research to improve overall N use efficiency in agricultural systems while increasing crop yields in a sustainable manner, i.e. conserving the natural resource base and protecting the environment. It is a timely publication; increasing attention is being paid to N management in food production, energy consumption and environmental protection. The subject matter is covered in four chapters, starting with an introduction to N

  5. Project manager attributes influencing project success in the South ...

    African Journals Online (AJOL)

    success criteria for building projects in Ghana and concluded that the “current and ... qualifications, profession, leadership style and project team ... and expectations of project management competence between ... 1.d. Sense of teamwork ...

  6. [Management of a breast cystic syndrome: Guidelines].

    Science.gov (United States)

    Uzan, C; Seror, J-Y; Seror, J

    2015-12-01

    Breast cysts are common, often discovered incidentally or subsequently to pain or palpable mass. The purpose of these recommendations is to describe the sonographic findings for classifying breast cystic lesions, to analyze the value and contribution of various imaging techniques and sampling and to provide a management strategy. Literature review conducted by a small group and then reviewed and validated by the group designated by the Collège national des gynécologues et obstétriciens français (CNGOF) to make recommendations for clinical practice for benign breast lesions. Breast cysts are classified in 3 categories: simple cysts, complicated cysts and complex cysts. For simple cysts, after ultrasound, no further imaging is necessary, cytology is to consider only as analgesic. For complicated cysts, a control at 4-6 months is recommended; the use of cytology depends on the context (familial risk, difficulty of follow-up). In case of complex cyst, sampling by cytology or biopsy is recommended. More assessments of other imaging tests are reported. The sonographic characterization is essential for management of breast cyst. Copyright © 2015 Elsevier Masson SAS. All rights reserved.

  7. Water management planning guideline for waterpower

    International Nuclear Information System (INIS)

    2002-05-01

    Hydroelectric power has been used in Ontario for over 150 years, providing the impetus to economic development in the province. Currently, 83 hydroelectric utilities own the more than 200 hydro power facilities in Ontario, accounting for approximately 26 per cent of the total electrical generating capacity in the province. Flood control and the creation of recreational opportunities were added benefits derived from the construction of hydroelectric dams. The three ways of operating hydroelectric facilities are: run-of-the-river which involves minimal forebay storage, peaking which involves the operation of the dam for specific periods of high energy demand, and intermediate. The Ontario government plans to open the electricity market to competition, guided by four principles: (1) protecting consumers and offering more choice, (2) ensuring a strong business climate with a reliable supply of electricity, (3) protecting the environment, and (4) encouraging new ways of doing business and new sources of power. To address issues that arise from the operation of hydroelectric facilities, dam owners and hydroelectric facilities operators are required to develop Water Management Plans, outlining how the facility will be operated to balance environmental, social and economic objectives. The present document was developed to define goals and principles concerning planning, the scope of Water Management Plans, the criteria and the general planning process to be adopted for the preparation of the Plans. 1 tab., 4 figs

  8. Oil sands tailings management project

    Energy Technology Data Exchange (ETDEWEB)

    Godwalt, C. [Alberta WaterSMART, Calgary, AB (Canada); Kotecha, P. [Suncor Energy Inc, Calgary, AB (Canada); Aumann, C. [Alberta Innovates - Technology Futures, Alberta Governement, AB (Canada)

    2010-11-15

    The Oil sands leadership initiative (OSLI) works with the Government of Alberta on the development of the oil sands industry, considering environmental, economical and social aspects. Water management was identified as one of most important areas to focus on. Alberta WaterSMART was requested to support the development and the management of projects resulting from the work done or underway in this field. The development of a regional water management solution stood out as the most interesting solution to obtain significant results. In the Athabasca Region, oil sands producers work independently on their water sourcing and disposal with particular attention to fresh water conservation and economics. The Athabasca River represents a source for mines and distant saline aquifers are the target of steam assisted gravity drainage (SAGD) operators. As part of a four-phase project aiming to study the environmental and economic footprint (EEF) benefit of alternatives for Athabasca oil sands production water supply and disposal, the purpose of the tailings water management project was to identify tailings treatment technologies that are ready to be implemented, and to design and evaluate solutions in order to improve regional oil sands production water sourcing and disposal. Alternatives were evaluated based on their total EEF, applying a lifecycle assessment methodology with a particular attention on the quantification of important performance indicators. 25 refs., 8 tabs., 40 figs.

  9. Oil sands tailings management project

    International Nuclear Information System (INIS)

    Godwalt, C.; Kotecha, P.; Aumann, C.

    2010-11-01

    The Oil sands leadership initiative (OSLI) works with the Government of Alberta on the development of the oil sands industry, considering environmental, economical and social aspects. Water management was identified as one of most important areas to focus on. Alberta WaterSMART was requested to support the development and the management of projects resulting from the work done or underway in this field. The development of a regional water management solution stood out as the most interesting solution to obtain significant results. In the Athabasca Region, oil sands producers work independently on their water sourcing and disposal with particular attention to fresh water conservation and economics. The Athabasca River represents a source for mines and distant saline aquifers are the target of steam assisted gravity drainage (SAGD) operators. As part of a four-phase project aiming to study the environmental and economic footprint (EEF) benefit of alternatives for Athabasca oil sands production water supply and disposal, the purpose of the tailings water management project was to identify tailings treatment technologies that are ready to be implemented, and to design and evaluate solutions in order to improve regional oil sands production water sourcing and disposal. Alternatives were evaluated based on their total EEF, applying a lifecycle assessment methodology with a particular attention on the quantification of important performance indicators. 25 refs., 8 tabs., 40 figs.

  10. Environmental Management of Pediatric Asthma: Guidelines for Health Care Providers

    Science.gov (United States)

    Roberts, James R.; McCurdy, Leyla Erk

    2005-01-01

    These guidelines are the product of a new Pediatric Asthma Initiative aimed at integrating environmental management of asthma into pediatric health care. This document outlines competencies in environmental health relevant to pediatric asthma that should be mastered by primary health care providers, and outlines the environmental interventions…

  11. Saudi Oncology Society clinical management guidelines for renal cell carcinoma

    Directory of Open Access Journals (Sweden)

    Shouki Bazarbashi

    2011-01-01

    Full Text Available In this report, guidelines for the evaluation, medical and surgical management of renal cell carcinoma is presented. It is categorized according to the stage of the disease using the tumor node metastasis staging system, 7th edition. The recommendations are presented with supporting evidence level.

  12. Strategy and Management Guideline on Preventive School Maintenance in Eritrea

    DEFF Research Database (Denmark)

    Vagnby, Bo Hellisen

    An action-oriented and practical guideline for the planning, organisation and management of preventive school maintenance in Eritrea. The manual is the result of a participatory planning process which has involved actors at the school and community level, district levels and the national policy...

  13. Adherence to International Guidelines in the Management of ...

    African Journals Online (AJOL)

    Purpose: The role of physicians in the overall management of hypertension and their adherence to the JNC VII, WHO/ISH and ESH guidelines were examined in this study. Method: Case notes of hypertensive patients diagnosed between 1 January 2004 and 30 September 2005, in the Cardiology Clinic of University of ...

  14. Compliance with standard treatment guidelines in the management ...

    African Journals Online (AJOL)

    Introduction: Hypertension is a leading lifestyle disease and major cause of morbidity and mortality in South Africa, and globally. Standard Treatment Guidelines are issued in this country to assist healthcare workers in the diagnosis and management there of. Considering the debilitating effects caused by hypertension, the ...

  15. Severe accident management. Optimized guidelines and strategies

    International Nuclear Information System (INIS)

    Braun, Matthias; Löffler, Micha; Plank, Hermann; Asse, Dietmar; Dimmelmeier, Harald

    2014-01-01

    The highest priority for mitigating the consequences of a severe accident with core melt lies in securing containment integrity, as this represents the last barrier against fission product release to the environment. Containment integrity is endangered by several physical phenomena, especially highly transient phenomena following high-pressure reactor pressure vessel failure (like direct containment heating or steam explosions which can lead to early containment failure), hydrogen combustion, quasi-static over-pressure, temperature failure of penetrations, and basemat penetration by core melt. Each of these challenges can be counteracted by dedicated severe accident mitigation hardware, like dedicated primary circuit depressurization valves, hydrogen recombiners or igniters, filtered containment venting, containment cooling systems, and core melt stabilization systems (if available). However, besides their main safety function these systems often have also secondary effects that need to be considered. Filtered containment venting causes (though limited) fission product release into the environment, primary circuit depressurization leads to loss of coolant, and an ex-vessel core melt stabilization system as well as hydrogen igniters can generate high pressure and temperature loads on the containment. To ensure that during a severe accident any available systems are used to their full beneficial extent while minimizing their potential negative impact, AREVA has implemented a severe accident management for German nuclear power plants. This concept makes use of extensive numerical simulations of the entire plant, quantifying the impact of system activations (operational systems, safety systems, as well as dedicated severe accident systems) on the accident progression for various scenarios. Based on the knowledge gained, a handbook has been developed, allowing the plant operators to understand the current state of the plant (supported by computational aids), to predict

  16. The impacts of the 1995 financial institution environmental guidelines on power projects

    International Nuclear Information System (INIS)

    Weaver, K.L.; Schott, G.A.

    1996-01-01

    In 1995, two of the most influential international financial institutions, The World Bank and The US Export-Import Bank (Ex-Im Bank) issued new environmental guidelines. These guidelines, particularly the World Bank guidelines, are used as a benchmark for evaluating the environmental acceptability of a project by many financial institutions, project developers, private investors, the public, and many developing countries. The impact of these guidelines must be well understood by developers of power projects in order to obtain the necessary financing, in addition to attracting investors, and obtaining national approvals and general public acceptance

  17. Head injury management guidelines for general practitioners

    Directory of Open Access Journals (Sweden)

    Jeremy C Ganz

    2011-01-01

    Full Text Available A complete examination of a head injured patient in the hospital requires a number of instruments. These include a stethoscope, sphygmomanometer, ophthalmoscope, otoscope, cotton wool, safety pin, tuning fork, reflex hammer and a small key to test the plantar response. Few of these are required at the accident scene. This is because, in the hospital, the aim is optimal definitive treatment. At the accident scene, the aim is prevention of secondary injury, rapid recording of the most important findings and safe efficient transport to the hospital. This short paper reviews how the local doctor should undertake a neurosurgical assessment of traumatic brain injury patients. Moreover, the primary management at accident scenes is described and the rationale behind the approach is outlined

  18. Guidelines for respiratory motion management in radiation therapy

    International Nuclear Information System (INIS)

    Matsuo, Yukinori; Onishi, Hiroshi; Nakagawa, Keiichi

    2013-01-01

    Respiratory motion management (RMM) systems in external and stereotactic radiotherapies have been developed in the past two decades. Japanese medical service fee regulations introduced reimbursement for RMM from April 2012. Based on thorough discussions among the four academic societies concerned, these Guidelines have been developed to enable staff (radiation oncologists, radiological technologists, medical physicists, radiotherapy quality managers, radiation oncology nurses, and others) to apply RMM to radiation therapy for tumors subject to respiratory motion, safely and appropriately. (author)

  19. Breakthrough Propulsion Physics Project: Project Management Methods

    Science.gov (United States)

    Millis, Marc G.

    2004-01-01

    To leap past the limitations of existing propulsion, the NASA Breakthrough Propulsion Physics (BPP) Project seeks further advancements in physics from which new propulsion methods can eventually be derived. Three visionary breakthroughs are sought: (1) propulsion that requires no propellant, (2) propulsion that circumvents existing speed limits, and (3) breakthrough methods of energy production to power such devices. Because these propulsion goals are presumably far from fruition, a special emphasis is to identify credible research that will make measurable progress toward these goals in the near-term. The management techniques to address this challenge are presented, with a special emphasis on the process used to review, prioritize, and select research tasks. This selection process includes these key features: (a) research tasks are constrained to only address the immediate unknowns, curious effects or critical issues, (b) reliability of assertions is more important than the implications of the assertions, which includes the practice where the reviewers judge credibility rather than feasibility, and (c) total scores are obtained by multiplying the criteria scores rather than by adding. Lessons learned and revisions planned are discussed.

  20. Project risk management: A review of an institutional project life cycle

    Directory of Open Access Journals (Sweden)

    Wanjiru Gachie

    2017-11-01

    Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects

  1. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  2. [The research project: financing and management].

    Science.gov (United States)

    Schena, F P

    2003-01-01

    Basic and clinical research is accomplished by projects. The design of a project is not only based on the scientific content but also on its financing and management. This article wants to illustrate the correct modalities for project financing and project management in a scientific project.

  3. Project management v praxi

    OpenAIRE

    Králová, Eliška

    2013-01-01

    Project management approaches are commonly used to write and implement business plans. In this thesis standard project management tools and methods are applied to a real project, which aims to improve the properties of the product it offers (an online educational game). This project is unique in that it is based on a voluntary basis, has limited resources and is very responsive to market demands. Project management is broken down into four stages according to the project life cycle: initiatio...

  4. Managing MDO Software Development Projects

    Science.gov (United States)

    Townsend, J. C.; Salas, A. O.

    2002-01-01

    Over the past decade, the NASA Langley Research Center developed a series of 'grand challenge' applications demonstrating the use of parallel and distributed computation and multidisciplinary design optimization. All but the last of these applications were focused on the high-speed civil transport vehicle; the final application focused on reusable launch vehicles. Teams of discipline experts developed these multidisciplinary applications by integrating legacy engineering analysis codes. As teams became larger and the application development became more complex with increasing levels of fidelity and numbers of disciplines, the need for applying software engineering practices became evident. This paper briefly introduces the application projects and then describes the approaches taken in project management and software engineering for each project; lessons learned are highlighted.

  5. Project report - an overview of the project and experiences with project management

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Mikkelsen, Bent Egberg

    1996-01-01

    A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project.......A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project....

  6. BIM Guidelines Inform Facilities Management Databases: A Case Study over Time

    Directory of Open Access Journals (Sweden)

    Karen Kensek

    2015-08-01

    Full Text Available A building information model (BIM contains data that can be accessed and exported for other uses during the lifetime of the building especially for facilities management (FM and operations. Working under the guidance of well-designed BIM guidelines to insure completeness and compatibility with FM software, architects and contractors can deliver an information rich data model that is valuable to the client. Large owners such as universities often provide these detailed guidelines and deliverable requirements to their building teams. Investigation of the University of Southern California (USC Facilities Management Service’s (FMS website showed a detailed plan including standards, file names, parameter lists, and other requirements of BIM data, which were specifically designated for facilities management use, as deliverables on new construction projects. Three critical details were also unearthed in the reading of these documents: Revit was the default BIM software; COBie was adapted to help meet facilities management goals; and EcoDomus provided a display of the collected data viewed through Navisworks. Published accounts about the Cinema Arts Complex developed with and under these guidelines reported positive results. Further examination with new projects underway reveal the rapidly changing relational database landscape evident in the new USC “Project Record Revit Requirement Execution Plan (PRxP”.

  7. 2017 European guidelines for the management of genital herpes.

    Science.gov (United States)

    Patel, Rajul; Kennedy, Oliver J; Clarke, Emily; Geretti, Anna; Nilsen, Arvid; Lautenschlager, Stephan; Green, John; Donders, Gilbert; van der Meijden, Willem; Gomberg, Mikhail; Moi, Harald; Foley, Elizabeth

    2017-12-01

    Genital herpes is one of the commonest sexually transmitted infections worldwide. Using the best available evidence, this guideline recommends strategies for diagnosis, management, and follow-up of the condition as well as for minimising transmission. Early recognition and initiation of therapy is key and may reduce the duration of illness or avoid hospitalisation with complications, including urinary retention, meningism, or severe systemic illness. The guideline covers a range of common clinical scenarios, such as recurrent genital herpes, infection during pregnancy, and co-infection with human immunodeficiency virus.

  8. Essentials of Project and Systems Engineering Management

    CERN Document Server

    Eisner, Howard S

    2008-01-01

    The Third Edition of Essentials of Project and Systems Engineering Management enables readers to manage the design, development, and engineering of systems effectively and efficiently. The book both defines and describes the essentials of project and systems engineering management and, moreover, shows the critical relationship and interconnection between project management and systems engineering. The author's comprehensive presentation has proven successful in enabling both engineers and project managers to understand their roles, collaborate, and quickly grasp and apply all the basic princip

  9. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  10. The Saudi Guidelines for the Diagnosis and Management of COPD

    Science.gov (United States)

    Khan, Javed H.; Lababidi, Hani M. S.; Al-Moamary, Mohamed S.; Zeitouni, Mohammed O.; AL-Jahdali, Hamdan H.; Al-Amoudi, Omar S.; Wali, Siraj O.; Idrees, Majdy M.; Al-Shimemri, Abdullah A.; Al Ghobain, Mohammed O.; Alorainy, Hassan S.; Al-Hajjaj, Mohamed S.

    2014-01-01

    The Saudi Thoracic Society (STS) launched the Saudi Initiative for Chronic Airway Diseases (SICAD) to develop a guideline for the diagnosis and management of chronic obstructive pulmonary disease (COPD). This guideline is primarily aimed for internists and general practitioners. Though there is scanty epidemiological data related to COPD, the SICAD panel believes that COPD prevalence is increasing in Saudi Arabia due to increasing prevalence of tobacco smoking among men and women. To overcome the issue of underutilization of spirometry for diagnosing COPD, handheld spirometry is recommended to screen individuals at risk for COPD. A unique feature about this guideline is the simplified practical approach to classify COPD into three classes based on the symptoms as per COPD Assessment Test (CAT) and the risk of exacerbations and hospitalization. Those patients with low risk of exacerbation (COPD patients, as manifested with ≥2 exacerbation or hospitalization in the past year irrespective of the baseline symptoms, are classified as Class III. Class I and II patients require bronchodilators for symptom relief, while Class III patients are recommended to use medications that reduce the risks of exacerbations. The guideline recommends screening for co-morbidities and suggests a comprehensive management approach including pulmonary rehabilitation for those with a CAT score ≥10. The article also discusses the diagnosis and management of acute exacerbations in COPD. PMID:24791168

  11. Photovoltaic system criteria documents. Volume 1: Guidelines for evaluating the management and operations planning of photovoltaic applications

    Science.gov (United States)

    Koenig, John C.; Billitti, Joseph W.; Tallon, John M.

    1979-01-01

    Guidelines are provided to the Field Centers for organization, scheduling, project and cost control, and performance in the areas of project management and operations planning for Photovoltaics Test and Applications. These guidelines may be used in organizing a T and A Project Team for system design/test, site construction and operation, and as the basis for evaluating T and A proposals. The attributes are described for project management and operations planning to be used by the Field Centers. Specifically, all project management and operational issues affecting costs, schedules and performance of photovoltaic systems are addressed. Photovoltaic tests and applications include residential, intermediate load center, central station, and stand-alone systems. The sub-categories of system maturity considered are: Initial System Evaluation Experiments (ISEE); System Readiness Experiments (SRE); and Commercial Readiness Demonstration Projects (CRDP).

  12. Frequency of adoption of practice management guidelines at trauma centers

    Science.gov (United States)

    Sobrino, Justin; Barnes, Sunni A.; Dahr, Nadine; Kudyakov, Rustam; Berryman, Candice; Nathens, Avery B.; Hemmila, Mark R.; Neal, Melanie

    2013-01-01

    Evidence-based management guidelines have been shown to improve patient outcomes, yet their utilization by trauma centers remains unknown. This study measured adoption of practice management guidelines or protocols by trauma centers. A survey of 228 trauma centers was conducted over 1 year; 55 completed the survey. Centers were classified into three groups: noncompliant, partially compliant, and compliant with adoption of management protocols. Characteristics of compliant centers were compared with those of the other two groups. Most centers were Level I (58%) not-for-profit (67%) teaching hospitals (84%) with a surgical residency (74%). One-third of centers had an accredited fellowship in surgical critical care (37%). Only one center was compliant with all 32 management protocols. Half of the centers were compliant with 14 of 32 protocols studied (range, 4 to 32). Of the 21 trauma center characteristics studied, only two were independently associated with compliant centers: use of physician extenders and daily attending rounds (both P < .0001). Adoption of management guidelines by trauma centers is inconsistent, with wide variations in practices across centers. PMID:23814383

  13. Systems Engineering Management Plan for Tank Farm Restoration and Safety Operations, Project W-314

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    The Systems Engineering Management Plan for Project W-314 has been prepared within the guidelines of HNF-SD-WM-SEMP-002, TWRS Systems Engineering Management Plan. The activities within this SEMP have been tailored, in accordance with the TWRS SEMP and DOE Order 430.1, Life Cycle Asset Management, to meet the needs of the project

  14. Misleading guidelines for the diagnosis and management of hypertension

    Directory of Open Access Journals (Sweden)

    Flávio Danni Fuchs

    2014-10-01

    Full Text Available International guidelines for the diagnosis and management of hypertension were recently released [1,2]. A historical trend of lowering the blood pressure (BP thresholds to diagnose hypertension in high risk individuals was unexpectedly reversed. BP targets for the treatment were modified accordingly. Therefore some individuals who were hypertensive before are now normotensive. Other guidelines still recommend the previous diagnostic limits and goals of treatment [3-5], resulting that an individual may be hypertensive in some countries and normotensive in others. The guidelines are more homogeneous in the recommendations for treatment, particularly in regard to the liberal options of drugs to starting the treatment. Unfortunately, in my view, this liberal view includes drugs without unbiased evidences of effectiveness, such as Angiotensin Receptor Blockers (ARB. In this point of view, I discuss the reasons and misconceptions in the establishment of diagnostic thresholds and the shortcomings in the recommendations of antihypertensive drugs.

  15. Project management plan for the 105-C Reactor interim safe storage project. Revision 1

    International Nuclear Information System (INIS)

    Miller, R.L.

    1997-01-01

    In 1942, the Hanford Site was commissioned by the US Government to produce plutonium. Between 1942 and 1955, eight water-cooled, graphite-moderated reactors were constructed along the Columbia River at the Hanford Site to support the production of plutonium. The reactors were deactivated from 1964 to 1971 and declared surplus. The Surplus Production Reactor Decommissioning Project (BHI 1994b) will decommission these reactors and has selected the 105-C Reactor to be used as a demonstration project for interim safe storage at the present location and final disposition of the entire reactor core in the 200 West Area. This project will result in lower costs, accelerated schedules, reduced worker exposure, and provide direct benefit to the US Department of Energy for decommissioning projects complex wide. This project sets forth plans, organizational responsibilities, control systems, and procedures to manage the execution of the Project Management Plan for the 105-C Reactor Interim Safe Storage Project (Project Management Plan) activities to meet programmatic requirements within authorized funding and approved schedules. The Project Management Plan is organized following the guidelines provided by US Department of Energy Order 4700.1, Project Management System and the Richland Environmental Restoration Project Plan (DOE-RL 1992b)

  16. Aging management guideline for commercial nuclear power plants - heat exchangers

    International Nuclear Information System (INIS)

    Booker, S.; Lehnert, D.; Daavettila, N.; Palop, E.

    1994-06-01

    This Aging Management Guideline (AMG) describes recommended methods for effective detection and mitigation of age-related degradation mechanisms in commercial nuclear power plant heat exchangers important to license renewal. The intent of this AMG is to assist plant maintenance and operations personnel in maximizing the safe, useful life of these components. It also supports the documentation of effective aging management programs required under the License Renewal Rule 10 CFR 54. This AMG is presented in a manner that allows personnel responsible for performance analysis and maintenance to compare their plant-specific aging mechanisms (expected or already experienced) and aging management program activities to the more generic results and recommendations presented herein

  17. Aging management guideline for commercial nuclear power plants - heat exchangers

    Energy Technology Data Exchange (ETDEWEB)

    Booker, S.; Lehnert, D.; Daavettila, N.; Palop, E.

    1994-06-01

    This Aging Management Guideline (AMG) describes recommended methods for effective detection and mitigation of age-related degradation mechanisms in commercial nuclear power plant heat exchangers important to license renewal. The intent of this AMG is to assist plant maintenance and operations personnel in maximizing the safe, useful life of these components. It also supports the documentation of effective aging management programs required under the License Renewal Rule 10 CFR 54. This AMG is presented in a manner that allows personnel responsible for performance analysis and maintenance to compare their plant-specific aging mechanisms (expected or already experienced) and aging management program activities to the more generic results and recommendations presented herein.

  18. Implementation of anaphylaxis management guidelines: a register-based study.

    Directory of Open Access Journals (Sweden)

    Linus Grabenhenrich

    Full Text Available BACKGROUND: Anaphylaxis management guidelines recommend the use of intramuscular adrenaline in severe reactions, complemented by antihistamines and corticoids; secondary prevention includes allergen avoidance and provision of self-applicable first aid drugs. Gaps between recommendations and their implementation have been reported, but only in confined settings. Hence, we analysed nation-wide data on the management of anaphylaxis, evaluating the implementation of guidelines. METHODS: Within the anaphylaxis registry, allergy referral centres across Germany, Austria and Switzerland provided data on severe anaphylaxis cases. Based on patient records, details on reaction circumstances, diagnostic workup and treatment were collected via online questionnaire. Report of anaphylaxis through emergency physicians allowed for validation of registry data. RESULTS: 2114 severe anaphylaxis patients from 58 centres were included. 8% received adrenaline intravenously, 4% intramuscularly; 50% antihistamines, and 51% corticoids. Validation data indicated moderate underreporting of first aid drugs in the Registry. 20% received specific instructions at the time of the reaction; 81% were provided with prophylactic first aid drugs at any time. CONCLUSION: There is a distinct discrepancy between current anaphylaxis management guidelines and their implementation. To improve patient care, a revised approach for medical education and training on the management of severe anaphylaxis is warranted.

  19. The Kozloduy project management unit

    International Nuclear Information System (INIS)

    Carnes, W.S.; Gros-Gean, P.; Demireva, E.

    2004-01-01

    The Project Management Unit (PMU) has been established in support to the Kozloduy NPP decommissioning department. It is comprised of a Consortium of the British Nuclear Group, EDF and subcontractor ENPRO Consult. It is responsible for the management of seven projects (a facility for dry storage of spent fuel; equipment to treat low activity liquid radioactive waste; provision of physical separation of the plant systems and areas to be decommissioned from the ones in operation; equipment to decontaminate and clean pools and large tanks; a facility to provide high volume reduction of solid radioactive wastes and retrieval and conditioning of ion exchange resins and other sorbents; equipment to provide measurement for the free-release of materials and components; a facility for personnel monitoring, decontamination and clothes changing for work outside of the normal radiological control areas) that will be used in support of the KNPP decommissioning process. The projects will be tendered in compliance with the European Bank for Reconstruction and Development requirements

  20. Project Management Communication 2.0

    DEFF Research Database (Denmark)

    Berggreen, Line; Kampf, Constance Elizabeth

    2015-01-01

    How can we understand project management communication practices for developing effective practices in professional and technical communication? In this article we explore an approach to project management that focuses on projects as having a technical documentation structure with content...... that is developed through social or interpersonal communication practices. Looking at the broader picture of project management which besides the implementation phase also includes conception, planning and closure, we see a project management framework that brings together both technical and social aspects...... of project communication. To understand how this works, we interviewed project managers about their understanding and strategy in communicating about the projects they lead. Findings demonstrate that more experienced project managers have a more nuanced understanding of project communication as both...

  1. Managing Small Spacecraft Projects: Less is Not Easier

    Science.gov (United States)

    Barley, Bryan; Newhouse, Marilyn

    2012-01-01

    Managing small, low cost missions (class C or D) is not necessarily easier than managing a full flagship mission. Yet, small missions are typically considered easier to manage and used as a training ground for developing the next generation of project managers. While limited resources can be a problem for small missions, in reality most of the issues inherent in managing small projects are not the direct result of limited resources. Instead, problems encountered by managers of small spacecraft missions often derive from 1) the perception that managing small projects is easier if something is easier it needs less rigor and formality in execution, 2) the perception that limited resources necessitate or validate omitting standard management practices, 3) less stringent or unclear guidelines or policies for small projects, and 4) stakeholder expectations that are not consistent with the size and nature of the project. For example, the size of a project is sometimes used to justify not building a full, detailed integrated master schedule. However, while a small schedule slip may not be a problem for a large mission, it can indicate a serious problem for a small mission with a short development phase, highlighting the importance of the schedule for early identification of potential issues. Likewise, stakeholders may accept a higher risk posture early in the definition of a low-cost mission, but as launch approaches this acceptance may change. This presentation discusses these common misconceptions about managing small, low cost missions, the problems that can result, and possible solutions.

  2. Project Management – Multi-perspective Leadership

    DEFF Research Database (Denmark)

    Riis, Eva

    2014-01-01

    Project Management – Multi-perspective Leadership” af Hans Mikkelsen og Jens Ove Riis - anmeldelse......”Project Management – Multi-perspective Leadership” af Hans Mikkelsen og Jens Ove Riis - anmeldelse...

  3. Project management in the library workplace

    CERN Document Server

    Daugherty, Alice

    2018-01-01

    This volume of Advances in Library Administration and Organization attempts to put project management into the toolboxes of library administrators through overviews of concepts, analyses of experiences, and forecasts for the use of project management within the profession.

  4. Risk management in product innovation projects

    NARCIS (Netherlands)

    Halman, J.I.M.; Keizer, J.A.

    1993-01-01

    In product innovation projects risk management has become increasingly important. Technological and commercial developments ask for effective and efficient product innovation. Systematic diagnosing and management of risks can help to make product innovation projects successful. In this paper a

  5. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Keywords: Communication skills and leadership model, construction project ..... help a manager handle stress and break tension (Gido & Clements,. 2012: 331; Harrin .... production and management of projects, the higher the demand for.

  6. Project management in practice : Evaluating a case project through project management theories

    OpenAIRE

    Uusitalo, Jenni

    2013-01-01

    The purpose of this thesis was to evaluate a case project and to study whether it was carried out in a correct manner; meaning that did the case project follow the project management models. In addition, part of the study was to determine what could have been improved in the management of the case project. The case project was about creating and launching a communication channel based on a social media service, on a blog platform called Tumblr, for Team Finland in Spain network. The network p...

  7. Project management. A discipline which contributes to project success

    International Nuclear Information System (INIS)

    Hoch, G.

    2008-01-01

    The presentation covers the following topics: description of the Project - a contract was signed between KNPP and European Consortium Kozloduy (ECK) consisting of Framatome ANP GmbH as Leader (63%), Framatome ANP S.A.S. (17%), Atomenergoexport (20%) ; Project management in the modernization of NPP Kozloduy units 5 and 6; Project management process within AREVA NP GmbH; current status

  8. The Little Black Book of Project Management

    CERN Document Server

    Thomsett, Michael C

    2009-01-01

    For nearly twenty years, The Little Black Book of Project Management has provided businesspeople everywhere with a quick and effective introduction to project management tools and methodology. The revised and updated third edition reflects the newest techniques, the latest project management software, as well as the most recent changes to the Project Management Body of Knowledge (PMBOK™). Readers will find invaluable strategies for: • Organizing any project • Choosing the project team • Preparing a budget and sticking to it • Scheduling, flowcharting, and controlling a project • Preparing proj

  9. [The German program for disease management guidelines--implementation with pathways and quality management].

    Science.gov (United States)

    Ollenschläger, Günter; Lelgemann, Monika; Kopp, Ina

    2007-07-15

    In Germany, physicians enrolled in disease management programs are legally obliged to follow evidence-based clinical practice guidelines. That is why a Program for National Disease Management Guidelines (German DM-CPG Program) was established in 2002 aiming at implementation of best-practice evidence-based recommendations for nationwide as well as regional disease management programs. Against this background the article reviews programs, methods and tools for implementing DM-CPGs via clinical pathways as well as regional guidelines for outpatient care. Special reference is given to the institutionalized program of adapting DM-CPGs for regional use by primary-care physicians in the State of Hesse.

  10. Evaluation of a Pain Management Education Program and Operational Guideline on Nursing Practice, Attitudes, and Pain Management.

    Science.gov (United States)

    Bonkowski, Sara L; De Gagne, Jennie C; Cade, Makia B; Bulla, Sally A

    2018-04-01

    Nurses lack adequate pain management knowledge, which can result in poorly managed postsurgical pain. This study aimed to develop, implement, and evaluate pain management education and operational guidelines to improve nursing knowledge and pain management. This quality improvement project employed convenience samples of surgical oncology nurses and postoperative patients. The intervention involved an online module, live education, and operational guideline for pain management. Nurses completed pre- and postintervention practice and attitudes surveys. Random chart reviews of intravenous narcotic administrations the day before discharge were completed to evaluate whether narcotic administration changed after intervention. Readmissions and Hospital Consumer Assessment of Healthcare Providers and Systems data were collected to determine whether the intervention influenced patient satisfaction. A statistically significant improvement in nursing practice and intravenous narcotic administrations demonstrated changes to pain management practices employed by the nursing staff. Although not statistically significant, fewer pain-related readmissions occurred postintervention. Findings demonstrate that targeted pain management continuing education, paired with operational guidelines, improves nursing practice and decreases intravenous narcotic administrations prior to discharge. J Contin Educ Nurs. 2018;49(4):178-185. Copyright 2018, SLACK Incorporated.

  11. Guidelines for the diagnosis, prevention and management of implantable cardiac electronic device infection. Report of a joint Working Party project on behalf of the British Society for Antimicrobial Chemotherapy (BSAC, host organization), British Heart Rhythm Society (BHRS), British Cardiovascular Society (BCS), British Heart Valve Society (BHVS) and British Society for Echocardiography (BSE).

    Science.gov (United States)

    Sandoe, Jonathan A T; Barlow, Gavin; Chambers, John B; Gammage, Michael; Guleri, Achyut; Howard, Philip; Olson, Ewan; Perry, John D; Prendergast, Bernard D; Spry, Michael J; Steeds, Richard P; Tayebjee, Muzahir H; Watkin, Richard

    2015-02-01

    Infections related to implantable cardiac electronic devices (ICEDs), including pacemakers, implantable cardiac defibrillators and cardiac resynchronization therapy devices, are increasing in incidence in the USA and are likely to increase in the UK, because more devices are being implanted. These devices have both intravascular and extravascular components and infection can involve the generator, device leads and native cardiac structures or various combinations. ICED infections can be life-threatening, particularly when associated with endocardial infection, and all-cause mortality of up to 35% has been reported. Like infective endocarditis, ICED infections can be difficult to diagnose and manage. This guideline aims to (i) improve the quality of care provided to patients with ICEDs, (ii) provide an educational resource for all relevant healthcare professionals, (iii) encourage a multidisciplinary approach to ICED infection management, (iv) promote a standardized approach to the diagnosis, management, surveillance and prevention of ICED infection through pragmatic evidence-rated recommendations, and (v) advise on future research projects/audit. The guideline is intended to assist in the clinical care of patients with suspected or confirmed ICED infection in the UK, to inform local infection prevention and treatment policies and guidelines and to be used in the development of educational and training material by the relevant professional societies. The questions covered by the guideline are presented at the beginning of each section. © The Author 2014. Published by Oxford University Press on behalf of the British Society for Antimicrobial Chemotherapy. All rights reserved. For Permissions, please e-mail: journals.permissions@oup.com.

  12. On Services for Collaborative Project Management

    Science.gov (United States)

    Ollus, Martin; Jansson, Kim; Karvonen, Iris; Uoti, Mikko; Riikonen, Heli

    This paper presents an approach for collaborative project management. The focus is on the support of collaboration, communication and trust. Several project management tools exist for monitoring and control the performance of project tasks. However, support of important intangible assets is more difficult to find. In the paper a leadership approach is identified as a management means and the use of new IT technology, especially social media for support of leadership in project management is discussed.

  13. Managing dualities in organizational change projects

    OpenAIRE

    Shaw, David

    2016-01-01

    When managers want to change their organisation they often set up a project to do it, in the belief that doing so simplifies and focuses the change initiative and brings greater assurance of success. Case studies of three organisational change projects undertaken by Arts Council England during 2006-2007 are used to examine the notion of project management and change management as a duality. It is argued that the structured, systematic approach associated with project management needs to be ba...

  14. Suggested Guidelines for Transparency and Participation in Nuclear Waste Management Programmes. Deliverable 22

    International Nuclear Information System (INIS)

    Jonsson, Josefin Paeivioe; Andersson, Kjell; Bolado, Ricardo; Drottz Sjoeberg, Britt-Marie; Elam, Mark; Sundqvist, Goeran; Kojo, Matti; Meskens, Gaston; Pritrsky, Jozef; Richardson, Phil; Soneryd, Linda; Steinerova, Lucie; Szerszynski, Bronislaw; Wene, Clas-Otto; Vojtechova, Hana

    2010-02-01

    The ARGONA project intended to demonstrate how participation and transparency link to the political and legal systems and how new approaches can be implemented in nuclear waste management programmes. Thereby, studies have been done of the institutional and cultural context within which processes of participation and transparency take place in order to understand how the processes can be applied. The project also included studies of theory in order to build participation and transparency on a firm ground, a number of case studies in Czech Republic, Finland, Sweden and UK, as well as implementation in Czech Republic to make a difference, learn and demonstrate. These proposed guidelines are thus the result of observations and conclusions made in these efforts, and should not be regarded as an attempt to give a comprehensive set of guidelines for nuclear waste management or even for the implementation of transparency and participation therein. However, it is the hope among the ARGONA participants that they can give relevant thoughts and stimulation to those involved in the nuclear waste management area, especially organizations that have, or may become, responsible for the implementation of processes of transparency and participation, such as implementing organizations, government agencies, regulators as well as regional and local communities. It should be recognized that some of the proposed guidelines may be more relevant for a certain type of bodies (such as an implementer) than for another type (such as local community) and vice versa. Some of the proposed guidelines are also relevant at broader societal level and for the European Union bodies. It will be up to the respective reader to judge the relevance for her or his organization. The suggested guidelines are followed by more detailed recommendations on how to combine the two basic forms of mediation that have been identified in ARGONA, namely mediation by demonstration and mediation by dialogue in Annex 1

  15. Spent Nuclear Fuel Project Safety Management Plan

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1996-02-01

    The Spent Nuclear Fuel Project Safety Management Plan describes the new nuclear facility regulatory requirements basis for the Spemt Nuclear Fuel (SNF) Project and establishes the plan to achieve compliance with this basis at the new SNF Project facilities

  16. Development of funding project risk management tools.

    Science.gov (United States)

    2013-11-01

    Funding project risk management is a process for identifying, assessing, and prioritizing project funding risks. To plan to : minimize or eliminate the impact of negative events, one must identify what projects have higher risk to respond to potentia...

  17. Guidelines on the management of patients treated with iodine-131

    International Nuclear Information System (INIS)

    1993-03-01

    The purpose of these guidelines is to assist health care institutions establish protocols for the management of patients treated with iodine-131. These guidelines are written primarily for the use of Na 131 I in the treatment of benign and malignant thyroid disease. The principles have some application for the use of complex 131 I-labelled radiopharmaceuticals in that the treated patient will become a temporary radiation source and since contamination with body fluids of treated patients must be guarded against. The document outlines radiation protection and logistical concerns associated with the management of 131 I patients before, during and after therapy. These concerns include the safety of health care personnel, visitors, and any other persons who are at risk; and protection of the environment. (L.L.) 23 refs., 2 tabs

  18. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  19. 76 FR 67400 - Capital Project Management

    Science.gov (United States)

    2011-11-01

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... extending the comment period on its proposed rule for Capital Project Management to December 2, 2011, to...) proposing to transform the current FTA rule for project management oversight into a discrete set of...

  20. 76 FR 56363 - Capital Project Management

    Science.gov (United States)

    2011-09-13

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... current FTA rule for project management oversight into a discrete set of managerial principles for sponsors of major capital projects; enable FTA to more clearly identify the necessary management capacity...

  1. 78 FR 16460 - Capital Project Management

    Science.gov (United States)

    2013-03-15

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... withdrawing its September 13, 2011, Notice of Proposed Rulemaking to revise the agency's project management... will reinitiate a rulemaking for project management oversight in the near future. Additionally, FTA may...

  2. Finance and supply management project execution plan

    Energy Technology Data Exchange (ETDEWEB)

    BENNION, S.I.

    1999-02-10

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  3. The evolution of the project management

    Directory of Open Access Journals (Sweden)

    Catalin Drob

    2009-12-01

    Full Text Available Project management has appeared and developed based on scientific management theory during the '50s-'60s of the last century. After the 1990s of the last century, we can say that project management has truly become an independent discipline, which has a huge impact on the success or failure of companies which are engaged in major projects.

  4. Current guidelines for management of children with functional constipation

    Directory of Open Access Journals (Sweden)

    V. P. Bulatov

    2015-01-01

    Full Text Available Despite the fact that functional constipations are a common and hence relevant problem of pediatrics, there are difficulties in managing this category of patients. The paper presents the current guidelines for the diagnosis and treatment of functional constipation in children, which rely on the principles of evidence-based medicine. Particular attention is given to the age-related aspects of constipation in childhood.

  5. IX Disposition Project - project management plan

    International Nuclear Information System (INIS)

    Choi, I.G.

    1994-01-01

    This report presents plans for resolving saving and disposal concerns for ion exchange modules, cartridge filters and columns. This plan also documents the project baselines for schedules, cost, and technical information

  6. Nutrition management guideline for maple syrup urine disease: an evidence- and consensus-based approach.

    Science.gov (United States)

    Frazier, Dianne M; Allgeier, Courtney; Homer, Caroline; Marriage, Barbara J; Ogata, Beth; Rohr, Frances; Splett, Patricia L; Stembridge, Adrya; Singh, Rani H

    2014-07-01

    In an effort to increase harmonization of care and enable outcome studies, the Genetic Metabolic Dietitians International (GMDI) and the Southeast Regional Newborn Screening and Genetics Collaborative (SERC) are partnering to develop nutrition management guidelines for inherited metabolic disorders (IMD) using a model combining both evidence- and consensus-based methodology. The first guideline to be completed is for maple syrup urine disease (MSUD). This report describes the methodology used in its development: formulation of five research questions; review, critical appraisal and abstraction of peer-reviewed studies and unpublished practice literature; and expert input through Delphi surveys and a nominal group process. This report includes the summary statements for each research question and the nutrition management recommendations they generated. Each recommendation is followed by a standardized rating based on the strength of the evidence and consensus used. The application of technology to build the infrastructure for this project allowed transparency during development of this guideline and will be a foundation for future guidelines. Online open access of the full, published guideline allows utilization by health care providers, researchers, and collaborators who advise, advocate and care for individuals with MSUD and their families. There will be future updates as warranted by developments in research and clinical practice. Copyright © 2014 The Authors. Published by Elsevier Inc. All rights reserved.

  7. Does Lean & Agile Project Management Help Coping with Project Complexity?

    NARCIS (Netherlands)

    Jalali Sohi, A.; Hertogh, M.J.C.M.; Bosch-Rekveldt, M.G.C.; Blom, R.; Serpell, A.; Ferrada, X.

    2016-01-01

    Still, projects in the construction sector are delivered with time delays and cost overruns. One of the reasons for poor performance was assigned to project complexity. A combination of lean construction and agile project management are hypothesized as a possible solution to cope with project

  8. Diagnosis and management of idiopathic pulmonary fibrosis: French practical guidelines

    Directory of Open Access Journals (Sweden)

    Bruno Crestani

    2014-06-01

    Full Text Available Idiopathic pulmonary fibrosis (IPF is the most frequent chronic idiopathic interstitial pneumonia in adults. The management of rare diseases in France has been organised by a national plan for rare diseases, which endorsed a network of expert centres for rare diseases throughout France. This article is an overview of the executive summary of the French guidelines for the management of IPF, an initiative that emanated from the French National Reference Centre and the Network of Regional Competence Centres for Rare Lung Diseases. This review aims at providing pulmonologists with a document that: 1 combines the current available evidence; 2 reviews practical modalities of diagnosis and management of IPF; and 3 is adapted to everyday medical practice. The French practical guidelines result from the combined efforts of a coordination committee, a writing committee and a multidisciplinary review panel, following recommendations from the Haute Autorité de Santé. All recommendations included in this article received at least 90% agreement by the reviewing panel. Herein, we summarise the main conclusions and practical recommendations of the French guidelines.

  9. Summary of the technical guidelines used in the project: The economics of greenhouse gas limitations

    International Nuclear Information System (INIS)

    Halsnaes, Kirsten

    1998-01-01

    This document is a summary version of the technical guidelines for climate change mitigation assessment developed as a part of the Global Environment Facility (GEF) project The Economics of Greenhouse Gas Limitations; Technical guidelines (UNEP 1998). The objectives of this project have been to support the development of a methodology, an implementing framework and a reporting system which countries can use in the construction of national climate change policies and in meeting their future reporting obligations under the FCCC. The methodological framework developed in the guidelines covers key economic concepts, scenario building, modelling tools and common assumptions. It was used by several country studies included in the project. (au)

  10. Female Project Managers' Workplace Problems: a Survey

    Science.gov (United States)

    Duong, Thuong Thi; Skitmore, Martin

    This article examines the extent to which challenges in the workplace may cause female project managers to be in a significantly small minority. A survey of members of the Australian Institute of Project Management in Queensland is described. This compares the experiences and observations of both men and women on various issues related to technical and gender aspects in project management workplaces. The results show that although female project managers experience many problems, male project managers also experience most of the same problems. Likewise, there are also few differences between more and less experience, the level of management, and types of industries. The differences that do occur involve discrimination against women in general, differences in project management styles, and support from other project managers.

  11. Influence of Planetary Protection Guidelines on Waste Management Operations

    Science.gov (United States)

    Hogan, John A.; Fisher, John W.; Levri, Julie A.; Wignarajah, Kanapathipi; Race, Margaret S.; Stabekis, Perry D.; Rummel, John D.

    2005-01-01

    Newly outlined missions in the Space Exploration Initiative include extended human habitation on Mars. During these missions, large amounts of waste materials will be generated in solid, liquid and gaseous form. Returning these wastes to Earth will be extremely costly, and will therefore likely remain on Mars. Untreated, these wastes are a reservoir of live/dead organisms and molecules considered to be "biomarkers" i.e., indicators of life). If released to the planetary surface, these materials can potentially confound exobiology experiments and disrupt Martian ecology indefinitely (if existent). Waste management systems must therefore be specifically designed to control release of problematic materials both during the active phase of the mission, and for any specified post-mission duration. To effectively develop waste management requirements for Mars missions, planetary protection guidelines must first be established. While previous policies for Apollo lunar missions exist, it is anticipated that the increased probability of finding evidence of life on Mars, as well as the lengthy mission durations will initially lead to more conservative planetary protection measures. To facilitate the development of overall requirements for both waste management and planetary protection for future missions, a workshop was conducted to identify how these two areas interface, and to establish a preliminary set of planetary protection guidelines that address waste management operations. This paper provides background regarding past and current planetary protection and waste management issues, and their interactions. A summary of the recommended planetary protection guidelines, anticipated ramifications and research needs for waste management system design for both forward (Mars) and backward (Earth) contamination is also provided.

  12. Barriers and Facilitators of Collaborative Management in Technological Innovation Projects

    Directory of Open Access Journals (Sweden)

    Sonia Regina Hierro Parolin

    2013-05-01

    Full Text Available Discussions about innovation tend to a more systemic and cooperative approach in which those networks focused on scientific and technological development are considered. This article aims to identify the barriers and facilitators in the collaborative management process of technological innovation projects and a study has been carried out by the cooperation action for innovation with 17 industries in Brazil. The primary evidence refers to the crucial role of project managers when leading the structural demands, and clarity on the relevance of the communication of strategic guidelines among the organizations involved for the achievement of the results in the industries.

  13. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  14. Guidelines of care for the management of acne vulgaris.

    Science.gov (United States)

    Zaenglein, Andrea L; Pathy, Arun L; Schlosser, Bethanee J; Alikhan, Ali; Baldwin, Hilary E; Berson, Diane S; Bowe, Whitney P; Graber, Emmy M; Harper, Julie C; Kang, Sewon; Keri, Jonette E; Leyden, James J; Reynolds, Rachel V; Silverberg, Nanette B; Stein Gold, Linda F; Tollefson, Megha M; Weiss, Jonathan S; Dolan, Nancy C; Sagan, Andrew A; Stern, Mackenzie; Boyer, Kevin M; Bhushan, Reva

    2016-05-01

    Acne is one of the most common disorders treated by dermatologists and other health care providers. While it most often affects adolescents, it is not uncommon in adults and can also be seen in children. This evidence-based guideline addresses important clinical questions that arise in its management. Issues from grading of acne to the topical and systemic management of the disease are reviewed. Suggestions on use are provided based on available evidence. Copyright © 2016 American Academy of Dermatology, Inc. Published by Elsevier Inc. All rights reserved.

  15. Case reports and clinical guidelines for managing radix entomolaris

    Directory of Open Access Journals (Sweden)

    Bejoy J Thomas

    2016-01-01

    Full Text Available Knowledge about the external and internal anatomy of the tooth is essential for successful dental practice. Anomalies in the tooth are often encountered which poses difficulties in dental treatments. As like any other tooth, mandibular first molars are also prone for anatomic malformations. One such anatomic variation is the presence of extra root distolingually. This distolingual root is called radix entomolaris (RE. The presence of an additional root can lead to difficulties during endodontic therapy. This article is a report of two cases describing the management of the first mandibular molars with an RE and clinical guidelines for its management.

  16. [Scandinavian guidelines for prehospital management of severe traumatic brain injury

    DEFF Research Database (Denmark)

    Sollid, S.; Sundstrom, T.; Kock-Jensen, C.

    2008-01-01

    . Evidence-based guidelines already exist that focus on all steps in the process. In the present article members of the Scandinavian Neurotrauma Committee present recommendations on prehospital management of traumatic brain injury adapted to the infrastructure of the Nordic region Udgivelsesdato: 2008/6/26......Head trauma is the cause the death for many young persons. The number of fatalities can be reduced through systematic management. Prevention of secondary brain injury combined with the fastest possible transport to a neurosurgical unit, have been shown to effectively reduce mortality and morbidity...

  17. Review and analysis of management guidelines of basal cell carcinoma

    International Nuclear Information System (INIS)

    Garcia Nunez, Hernan

    2013-01-01

    International guidelines for management of basal cell carcinoma are reviewed and analyzed for decision-making in the appropriate therapeutic behavior for patients. The different therapies for the treatment of basal cell carcinoma are described. Different therapies are evaluated according to the risk (low or high) of recurrence to determine the appropriate treatment. According to the evidence, low-risk tumors have responded to topical therapy, curettage and electrodesiccation, cryotherapy or simple resection, and high-risk tumors are managed with surgery, radiotherapy or Mohs' micrographic surgery [es

  18. 97 Things Every Project Manager Should Know

    CERN Document Server

    Davis, Barbee

    2009-01-01

    If the projects you manage don't go as smoothly as you'd like, 97 Things Every Project Manager Should Know offers knowledge that's priceless, gained through years of trial and error. This illuminating book contains 97 short and extremely practical tips -- whether you're dealing with software or non-IT projects -- from some of the world's most experienced project managers and software developers. You'll learn how these professionals have dealt with everything from managing teams to handling project stakeholders to runaway meetings and more. While this book highlights software projects, its w

  19. SharePoint 2010 for Project Management

    CERN Document Server

    Sy, Dux

    2012-01-01

    If you were to analyze your team's performance on a typical project, you'd be surprised how much time is wasted on non-productive tasks. This hands-on guide shows you how to work more efficiently by organizing and managing projects with SharePoint 2010. You'll learn how to build a Project Management Information System (PMIS), customized to your project, that can effectively coordinate communication and collaboration among team members. Written by a certified Project Management Professional (PMP) and Microsoft SharePoint MVP with 15 years of IT project management experience, each chapter incl

  20. TERMINOLOGY MANAGEMENT FRAMEWORK DEVIATIONS IN PROJECTS

    Directory of Open Access Journals (Sweden)

    Олена Борисівна ДАНЧЕНКО

    2015-05-01

    Full Text Available The article reviews new approaches to managing projects deviations (risks, changes, problems. By offering integrated control these parameters of the project and by analogy with medical terminological systems building a new system for managing terminological variations in the projects. With an improved method of triads system definitions are analyzed medical terms that make up terminological basis. Using the method of analogy proposed new definitions for managing deviations in projects. By using triad integrity built a new system triad in project management, which will subsequently also analogous to develop a new methodology of deviations in projects.

  1. Guidelines on the management of abnormal liver blood tests

    Science.gov (United States)

    Cramb, Rob; Davison, Suzanne M; Dillon, John F; Foulerton, Mark; Godfrey, Edmund M; Hall, Richard; Harrower, Ulrike; Hudson, Mark; Langford, Andrew; Mackie, Anne; Mitchell-Thain, Robert; Sennett, Karen; Sheron, Nicholas C; Verne, Julia; Walmsley, Martine; Yeoman, Andrew

    2018-01-01

    These updated guidelines on the management of abnormal liver blood tests have been commissioned by the Clinical Services and Standards Committee (CSSC) of the British Society of Gastroenterology (BSG) under the auspices of the liver section of the BSG. The original guidelines, which this document supersedes, were written in 2000 and have undergone extensive revision by members of the Guidelines Development Group (GDG). The GDG comprises representatives from patient/carer groups (British Liver Trust, Liver4life, PBC Foundation and PSC Support), elected members of the BSG liver section (including representatives from Scotland and Wales), British Association for the Study of the Liver (BASL), Specialist Advisory Committee in Clinical Biochemistry/Royal College of Pathology and Association for Clinical Biochemistry, British Society of Paediatric Gastroenterology, Hepatology and Nutrition (BSPGHAN), Public Health England (implementation and screening), Royal College of General Practice, British Society of Gastrointestinal and Abdominal Radiologists (BSGAR) and Society of Acute Medicine. The quality of evidence and grading of recommendations was appraised using the AGREE II tool. These guidelines deal specifically with the management of abnormal liver blood tests in children and adults in both primary and secondary care under the following subheadings: (1) What constitutes an abnormal liver blood test? (2) What constitutes a standard liver blood test panel? (3) When should liver blood tests be checked? (4) Does the extent and duration of abnormal liver blood tests determine subsequent investigation? (5) Response to abnormal liver blood tests. They are not designed to deal with the management of the underlying liver disease. PMID:29122851

  2. Transportation engineering project management : survey of practice.

    Science.gov (United States)

    2017-01-01

    Utah Department of Transportation (UDOT) project managers (PMs) have identified inefficiencies in the legacy : system electronic Program Management (ePM) used to manage consultant contracts and invoices. To help UDOT : prepare for potential system im...

  3. [The German program for disease management guidelines: type 2 diabetes--diabetic retinopathy/maculopathy guideline 2006. Short review].

    Science.gov (United States)

    Ollenschläger, Günter; Kopp, Ina; Thole, Henning; Lelgemann, Monika

    2007-02-15

    In Germany, the first national consensus between six medical scientific associations on evidence-based recommendations for prevention and therapy of retinopathy/maculopathy in type 2 diabetes was reached in fall 2006. The recommendations' main sources are the NICE Retinopathy Guideline 2002, and existing German guidelines and reviews of recent scientific evidence. The article gives an overview on authors, sources, and key recommendations of the German National Disease Management Guideline Type 2 Diabetes-Retinopathy/Maculopathy 2006 (www.diabetes.versorgungsleitlinien.de).

  4. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  5. Management of Implantable Cardioverter Defibrillator Recipients: Care Beyond Guidelines.

    Science.gov (United States)

    Philippon, François; Sterns, Laurence D; Nery, Pablo B; Parkash, Ratika; Birnie, David; Rinne, Claus; Mondesert, Blandine; Exner, Derek; Bennett, Matthew

    2017-08-01

    This companion article is intended to address common clinical scenarios in patients with implantable defibrillators that were not addressed in the 2016 Canadian Cardiovascular Society/Canadian Heart Rhythm Society implantable cardioverter defibrillator guidelines including recommendations for device programming to improve detection, to minimize shocks (appropriate and inappropriate), and to minimize ventricular pacing. Important issues at the time of replacement such as device prescription, technical aspects (vascular access, extraction), and management of components on advisories are also discussed. Finally, common clinical scenarios such as management of patients with terminal illnesses, recurrent ventricular tachycardia, electrical storms, catheter ablation for ventricular tachycardia, and system infection management are considered. The management of these patients requires a team approach and comprehensive knowledge surrounding these common clinical scenarios. Copyright © 2017 Canadian Cardiovascular Society. Published by Elsevier Inc. All rights reserved.

  6. Recommendations for Guidelines for Environment-Specific Magnetic-Field Measurements, Rapid Program Engineering Project #2

    Energy Technology Data Exchange (ETDEWEB)

    Electric Research and Management, Inc.; IIT Research Institute; Magnetic Measurements; Survey Research Center, University of California; T. Dan Bracken, Inc.

    1997-03-11

    The purpose of this project was to document widely applicable methods for characterizing the magnetic fields in a given environment, recognizing the many sources co-existing within that space. The guidelines are designed to allow the reader to follow an efficient process to (1) plan the goals and requirements of a magnetic-field study, (2) develop a study structure and protocol, and (3) document and carry out the plan. These guidelines take the reader first through the process of developing a basic study strategy, then through planning and performing the data collection. Last, the critical factors of data management, analysis reporting, and quality assurance are discussed. The guidelines are structured to allow the researcher to develop a protocol that responds to specific site and project needs. The Research and Public Information Dissemination Program (RAPID) is based on exposure to magnetic fields and the potential health effects. Therefore, the most important focus for these magnetic-field measurement guidelines is relevance to exposure. The assumed objective of an environment-specific measurement is to characterize the environment (given a set of occupants and magnetic-field sources) so that information about the exposure of the occupants may be inferred. Ideally, the researcher seeks to obtain complete or "perfect" information about these magnetic fields, so that personal exposure might also be modeled perfectly. However, complete data collection is not feasible. In fact, it has been made more difficult as the research field has moved to expand the list of field parameters measured, increasing the cost and complexity of performing a measurement and analyzing the data. The guidelines address this issue by guiding the user to design a measurement protocol that will gather the most exposure-relevant information based on the locations of people in relation to the sources. We suggest that the "microenvironment" become the base unit of area in a study, with

  7. 36 CFR 328.5 - Guidelines for seaplane use of project waters.

    Science.gov (United States)

    2010-07-01

    ... of project waters. 328.5 Section 328.5 Parks, Forests, and Public Property CORPS OF ENGINEERS... ADMINISTERED BY THE CHIEF OF ENGINEERS § 328.5 Guidelines for seaplane use of project waters. (a) All... power boats or vessels. (b) Seaplanes on project waters and lands in excess of 24 hours shall be...

  8. Apply Lean Thinking in Project Management

    OpenAIRE

    Pham Ngoc, Lan

    2015-01-01

    The purpose of this thesis was to study the effects of Lean Thinking in Project Management and how applying Lean Project Management could enhance the productivity of project work. The study was carried using theoretical research and collecting empirical data from three interviews and one case study at a local company. At the end of the study, the major project management problems at the company were identified and analyzed following Lean Principles. It was also pointed out where there...

  9. Modern project management theory and knowledge framework

    Institute of Scientific and Technical Information of China (English)

    Luo Zhongbao

    2014-01-01

    The scholars increasingly pay at ention to the internal rules in knowledge development and innovation of construction engineering management,as wel as the framework for engineering management body of knowledge. Considering the one-of-a-kind characteristic of construction project s and highly dependence from projects on management knowledge and its innovation,this paper analyzed the knowledge body of engineering management and its development dimension ,such as thinking and knowledge structure dimensions. The engineering management knowledge innovation model and structural model were put forward. The paper reviewed and proposed the engineering management knowledge system framework under engineering thinking mode,including the basic knowledge system framework which is used in engineering management research ,and a framework for body of knowledge which is applicable for engineering management practice. Based on a brief analysis of engineering management practice,this paper analyzed the development progres of engineering management from engineering thinking to ethical thinking and philosophical thinking. A dynamic model formed from the modern engineering management theory was put forward. The construction of projects are divided into two stages:an investment decision-making stage, and project implementation stage. According to the fact that project owners obtain the project products by transaction,the management during project implementation stage are divided into two aspects:project transaction management for the owner, and construction project management for the contractor. Thus, the three theoretical modules of modern engineering management were established:project investment decision-making management theory,engineering transaction management theory, and engineering project management theory. This paper further analyzed the content and basic theoretical issues of each theoretical module.

  10. Integrated Financial Management Information Systems: Guidelines for effective implementation by the public sector of South Africa

    Directory of Open Access Journals (Sweden)

    Christoffel J. Hendriks

    2012-12-01

    Full Text Available Background: Integrated Financial Management Information Systems (IFMIS can improve public sector management by providing real-time financial information to managers in order to enhance their decision-making capabilities. The South African Public Service is currently busy with the implementation of an IFMIS. However, the implementation of such a project has proved to be a very demanding undertaking and has not been met with resounding success.Objectives: The research was conducted in order to identify the challenges and risks that are involved in the implementation of the IFMIS in South Africa. After identification of the challenges and risks, solutions or guidelines were developed that may make the implementation more successful.Method: The methodology that was used is that of a literature study where theories were explored and used to solve a research problem. Based on the theoretical research, solutions and guidelines were developed to solve challenges and risks experienced.Results: The results indicated that there are a number of challenges involved with the implementation of an IFMIS. A set of best practice guidelines was developed that may make the implementation more successful.Conclusion: The sheer size and complexity of an IFMIS poses significant challenges and a number of risks to the implementation process. There are, however, critical success factors or best practices that can be used for the project to succeed. It is recommended that these best practices be used by the South African Public Service.

  11. 2013 European guideline on the management of lymphogranuloma venereum.

    Science.gov (United States)

    de Vries, H J C; Zingoni, A; Kreuter, A; Moi, H; White, J A

    2015-01-01

    WHAT IS NEW IN THIS UPDATED GUIDELINE?: This is the update version of the 2010 European guideline on the management of lymphogranuloma venereum (LGV). New issues are: Based on clonal relatedness of prevalent LGV strains there is evidence that the LGV epidemic among men who have sex with men (MSM) in the Western world prevailed already in the United States in the 1980s and was introduced into Europe by the end of the last century. A new LGV variant causing severe proctitis was unveiled and designated L2c. The L2b LGV variant causing the vast majority of infections among MSM is now also found among a few heterosexual women. Apart from HIV and STI screening, Hepatitis C Virus (HCV) testing should be offered to all LGV patients. To exclude reinfections, STI screening during a follow-up visit 3 months after an LGV diagnosis should be offered. © 2014 European Academy of Dermatology and Venereology.

  12. Consensus guidelines on management of childhood convulsive status epilepticus.

    Science.gov (United States)

    Mishra, Devendra; Sharma, Suvasini; Sankhyan, Naveen; Konanki, Ramesh; Kamate, Mahesh; Kanhere, Sujata; Aneja, Satinder

    2014-12-01

    Status epilepticus has a wide etiological spectrum, and significant morbidity and mortality. Management using a pre-determined uniform protocol leads to better outcomes. Multiple protocols for management of childhood status epilepticus are available, without much consensus. A 'Multi-disciplinary Consensus Development Workshop on Management of Status Epilepticus in Children in India' was organized. The invited experts included Pediatricians, Pediatric neurologists, Neurologists, Epileptologists, and Pediatric intensive care specialists from India, with experience in the relevant field. Experts had previously been divided into focus groups and had interacted on telephone and e-mail regarding their group recommendations, and developed consensus on the topic. During the meeting, each group presented their recommendations, which were deliberated upon by the house and a consensus was reached on various issues; the document was finalized after incorporating suggestions of experts on the draft document. To provide consensus guidelines on evaluation and management of convulsive status epilepticus in children in India (excluding neonatal and super-refractory status epilepticus). Each institution should use a pre-determined protocol for management of status epilepticus; pre-hospital management and early stabilization is the key to a satisfactory outcome of status epilepticus. Pharmacotherapy should not be delayed for any investigations; the initial management should consist of a parenteral benzodiazepine by any route feasible. Subsequent management has been detailed. The group also felt the need for more epidemiological research on status epilepticus from India, and identified certain research areas for the purpose.

  13. Culture and conflict management style of international project managers

    OpenAIRE

    Mohammed, U. K.; Prabhakar, G. P.; White, G.

    2008-01-01

    The management of culture has become increasingly important to many organisations and business disciplines, particularly multicultural and international project management. Cultural differences often result in varying degrees of conflict and require careful consideration. This study surveys 116 Project Managers using the Thomas-Kilmann Conflict Mode Instrument to determine their approach toward managing conflict. Indian, French and UK Project Managers’ conflict management style are correlated...

  14. Open Source Approach to Project Management Tools

    Directory of Open Access Journals (Sweden)

    Romeo MARGEA

    2011-01-01

    Full Text Available Managing large projects involving different groups of people and complex tasks can be challenging. The solution is to use Project management software, which allows a more efficient management of projects. However, famous project management systems can be costly and may require expensive custom servers. Even if free software is not as complex as Microsoft Project, is noteworthy to think that not all projects need all the features, amenities and power of such systems. There are free and open source software alternatives that meet the needs of most projects, and that allow Web access based on different platforms and locations. A starting stage in adopting an OSS in-house is finding and identifying existing open source solution. In this paper we present an overview of Open Source Project Management Software (OSPMS based on articles, reviews, books and developers’ web sites, about those that seem to be the most popular software in this category.

  15. MULTIPLE PROJECT MANAGEMENT IN THE CONSTRUCTION INDSUTRY

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2010-06-01

    Full Text Available The field of project management has historically focused on the administration of one project at a time, a focus that is insufficient given the growing need for organizations to manage multiple projects simultaneously. The requirements of Multiple Project Management (MPM involves demands and practices that are different from those of single projects. MPM poses a special need for coordination of shared resources across multiple projects in a way that can maintain the firm’s strategic focus and facilitate effective decision making. The construction industry is noteworthy for its frequent need for the management of multiple projects. This paper offers a review of the last five years of indexed literature related to multiple project management in the construction industry, identifies gaps and suggests promising new avenues of inquiry.

  16. MANAGING INNOVATION PROJECTS USING DISTRIBUTION LOGISTICS

    Directory of Open Access Journals (Sweden)

    Erika Loučanová

    2015-12-01

    Full Text Available A significant part of innovation projects management is the distribution logistics. From the point of view of time and material content, the properly chosen way of distribution is one of many factors for success of the project and innovation creation itself. The paper points out the fundamental basis of innovation management in the stage of its realization referring to the importance of distribution logistics in this part of innovation project management. Distribution logistics in the project management provides comprehensive solutions to efficiency of tangible relocating processes in all connections and mutual relations of project in order to maintain compliance between economy and business when implementing innovations.

  17. Managing complex, high risk projects a guide to basic and advanced project management

    CERN Document Server

    Marle, Franck

    2016-01-01

    Maximizing reader insights into project management and handling complexity-driven risks, this book explores propagation effects, non-linear consequences, loops, and the emergence of positive properties that may occur over the course of a project. This book presents an introduction to project management and analysis of traditional project management approaches and their limits regarding complexity. It also includes overviews of recent research works about project complexity modelling and management as well as project complexity-driven issues. Moreover, the authors propose their own new approaches, new methodologies and new tools which may be used by project managers and/or researchers and/or students in the management of their projects. These new elements include project complexity definitions and frameworks, multi-criteria approaches for project complexity measurement, advanced methodologies for project management (propagation studies to anticipate potential behaviour of the project, and clustering approaches...

  18. Project Management in Real Time: A Service-Learning Project

    Science.gov (United States)

    Larson, Erik; Drexler, John A., Jr.

    2010-01-01

    This article describes a service-learning assignment for a project management course. It is designed to facilitate hands-on student learning of both the technical and the interpersonal aspects of project management, and it involves student engagement with real customers and real stakeholders in the creation of real events with real outcomes. As…

  19. Uranium Mill Tailings Remedial Action Project surface project management plan

    International Nuclear Information System (INIS)

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials

  20. Project management strategies for prototyping breakdowns

    DEFF Research Database (Denmark)

    Granlien, Maren Sander; Pries-Heje, Jan; Baskerville, Richard

    2009-01-01

    , managing the explorative and iterative aspects of prototyping projects is not a trivial task. We examine the managerial challenges in a small scale prototyping project in the Danish healthcare sector where a prototype breakdown and project escalation occurs. From this study we derive a framework...... of strategies for coping with escalation in troubled prototyping projects; the framework is based on project management triangle theory and is useful when considering how to manage prototype breakdown and escalation. All strategies were applied in the project case at different points in time. The strategies led...

  1. Chosen aspects of innovative projects management

    Directory of Open Access Journals (Sweden)

    J. Gawlik

    2010-07-01

    Full Text Available Any company willing to maintain its market position has to search and implement innovative products and services. Integrated development ofenterprise’s innovative activity requests a constant search for new technologies and new organizational forms. Ability of effectivemanagement of innovative projects becomes a crucial issue. The paper presents a characteristic of innovative projects accordingly toOECD standards. Project management concepts based on Project Management Institute (PMI and International Project ManagementAssociation (IPMA procedures have been discussed. Key success factors have been defined, i.e.: obtaining assumed project outcome (range, project implementation conform to planned schedule (deadline, maintaining project costs under a certain limit (budget, quality (are the customers satisfied?, resources (team losses and interpersonal relations. Tables comparing product innovativeness with fields of requested know – how for particular product innovativeness levels have been elaborated. Finally, SCRUM method of adaptive project management aiming at providing possibly optimal outcome has been described.

  2. 43 CFR 418.29 - Project management.

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to be...

  3. Graduate Student Project: Operations Management Product Plan

    Science.gov (United States)

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  4. Basic Project Management Methodologies for Survey Researchers.

    Science.gov (United States)

    Beach, Robert H.

    To be effective, project management requires a heavy dependence on the document, list, and computational capability of a computerized environment. Now that microcomputers are readily available, only the rediscovery of classic project management methodology is required for improved resource allocation in small research projects. This paper provides…

  5. SIMULATION OF ORGANIZATIONAL ILLNESSES IN PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Денис Антонович ХАРИТОНОВ

    2015-05-01

    Full Text Available The article examined the fractal model of organizational diagnosis of pathologies in project management development. The proposed fractal model based on the competency approach to project management and allows evaluating the pathology of the project-oriented organizations.

  6. Adaptation of Agile Project Management Methodology for Project Team

    Directory of Open Access Journals (Sweden)

    Rasnacis Arturs

    2015-12-01

    Full Text Available A project management methodology that defines basic processes, tools, techniques, methods, resources and procedures used to manage a project is necessary for effective and successful IT project management. Each company needs to define its own methodology or adapt some of the existing ones. The purpose of the research is to evaluate the possibilities of adapting IT project development methodology according to the company, company employee characteristics and their mutual relations. The adaptation process will be illustrated with a case study at an IT company in Latvia where the developed methodology is based on Agile Scrum, one of the most widespread Agile methods.

  7. Software project management in a changing world

    CERN Document Server

    Ruhe, Günther

    2014-01-01

    By bringing together various current direc­tions, Software Project Management in a Changing World focuses on how people and organizations can make their processes more change-adaptive. The selected chapters closely correspond to the project management knowledge areas introduced by the Project Management Body of Knowledge, including its extension for managing software projects. The contributions are grouped into four parts, preceded by a general introduction. Part I "Fundamentals" provides in-depth insights into fundamental topics including resource allocation, cost estimation and risk manage

  8. Aging management guideline for commercial nuclear power plants-pumps

    International Nuclear Information System (INIS)

    Booker, S.; Katz, D.; Daavettila, N.; Lehnert, D.

    1994-03-01

    This Aging Management Guideline (AMG) describes recommended methods for effective detection and mitigation of age-related degradation mechanisms in BWR and PWR commercial nuclear power plant pumps important to license renewal. The intent of this AMG is to assist plant maintenance and operations personnel in maximizing the safe, useful life of these components. It also supports the documentation of effective aging management programs required under the License Renewal Rule 10 CFR Part 54. This AMG is presented in a manner that allows personnel responsible for performance analysis and maintenance to compare their plant-specific aging mechanisms (expected or already experienced) and aging management program activities to the more generic results and recommendations presented herein

  9. Aging management guideline for commercial nuclear power plants-pumps

    Energy Technology Data Exchange (ETDEWEB)

    Booker, S.; Katz, D.; Daavettila, N.; Lehnert, D. [MDC-Ogden Environmental and Energy Services, Southfield, MI (United States)

    1994-03-01

    This Aging Management Guideline (AMG) describes recommended methods for effective detection and mitigation of age-related degradation mechanisms in BWR and PWR commercial nuclear power plant pumps important to license renewal. The intent of this AMG is to assist plant maintenance and operations personnel in maximizing the safe, useful life of these components. It also supports the documentation of effective aging management programs required under the License Renewal Rule 10 CFR Part 54. This AMG is presented in a manner that allows personnel responsible for performance analysis and maintenance to compare their plant-specific aging mechanisms (expected or already experienced) and aging management program activities to the more generic results and recommendations presented herein.

  10. Aging Management Guideline for commercial nuclear power plants: Electrical switchgear

    International Nuclear Information System (INIS)

    Toman, G.; Gazdzinski, R.; Schuler, K.

    1993-07-01

    This Aging Management Guideline (AMG) provides recommended methods for effective detection and mitigation of age-related degradation mechanisms in BWR and PWR commercial nuclear power plant electrical switchgear important to license renewal. The latent of this AMG to assist plant maintenance and operations personnel in maximizing the safe, useful life of these components. It also supports the documentation of effective aging management programs required under the License Renewal Rule 10 CFR Part 54. This AMG is presented in a manner which allows personnel responsible for performance analysis and maintenance, to compare their plant-specific aging mechanisms (expected or already experienced) and aging management program activities to the more generic results and recommendations presented herein

  11. Amine Swingbed Payload Project Management

    Science.gov (United States)

    Walsch, Mary; Curley, Su

    2013-01-01

    The International Space Station (ISS) has been designed as a laboratory for demonstrating technologies in a microgravity environment, benefitting exploration programs by reducing the overall risk of implementing such technologies in new spacecraft. At the beginning of fiscal year 2010, the ISS program manager requested that the amine-based, pressure-swing carbon dioxide and humidity absorption technology (designed by Hamilton Sundstrand, baselined for the Orion Multi-Purpose Crew Vehicle, and tested at the Johnson Space Center in relevant environments, including with humans, since 2005) be developed into a payload for ISS Utilization. In addition to evaluating the amine technology in a flight environment before the first launch of the Orion vehicle, the ISS program wanted to determine the capability of the amine technology to remove carbon dioxide from the ISS cabin environment at the metabolic rate of the full 6 ]person crew. Because the amine technology vents the absorbed carbon dioxide and water vapor to space vacuum (open loop), additional hardware needed to be developed to minimize the amount of air and water resources lost overboard. Additionally, the payload system would be launched on two separate Space Shuttle flights, with the heart of the payload-the swingbed unit itself-launching a full year before the remainder of the payload. This paper discusses the project management and challenges of developing the amine swingbed payload in order to accomplish the technology objectives of both the open -loop Orion application as well as the closed-loop ISS application.

  12. Improving Project Portfolio Management (PPM) for Improvement Projects

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Jakobsen, Peter M.; Korsaa, Morten

    2017-01-01

    Project Portfolio Management (PPM) focus on the integration and alignment of projects with the business operation in order to achieve most value and cost-efficiency for the investment in projects. PPM is often a challenge and especially so for improvement projects where PPM is considerably...... of evaluating a portfolio of improvement projects and combine this evaluation with the effect they have on the CMMI maturity level. Further, the paper demonstrates how the combination of a strong senior management requirement for improved maturity and the focus on getting the most value out of PPM made...

  13. Educational Intervention Improves Compliance With AAN Guidelines for Return Epilepsy Visits: A Quality Improvement Project.

    Science.gov (United States)

    Nelson, Gary R; Filloux, Francis M; Kerr, Lynne M

    2016-10-01

    In 2011, the American Academy of Neurology (AAN) released guidelines for return seizure visits detailing 8 points that should be addressed during such visits. These guidelines are designed to improve routine follow-up care for epilepsy patients. The authors performed a quality improvement project aimed at increasing compliance with these guidelines after educating providers about them. The authors performed a chart review before and after an intervention which included: education regarding the guidelines, providing materials to remind providers of the guidelines, and templates to facilitate compliance. The authors reviewed charts at 2 and 6 months after the intervention. Significant improvement in documentation of 4 of the 8 measures was observed after this educational intervention. This suggests that simple educational interventions may help providers change practice and can improve compliance with new guidelines while requiring minimal time and resources to implement. © The Author(s) 2016.

  14. The project manager's desk reference: project planning, schedulding, evaluation, control, systems

    National Research Council Canada - National Science Library

    Lewis, James P

    2007-01-01

    In this Third Edition of The Project Manager's Desk Reference, top project management consultant James Lewis arms you with today's most comprehensive and understandable project management resources...

  15. Status of Project Management Education in Pakistan

    Science.gov (United States)

    Arain, Faisal Manzoor; Tipu, Syed Awais Ahmad

    2009-01-01

    Emerging contractual delivery systems, collaborative partnerships, new management initiatives, and global product markets require professionals and students to have a broader awareness of construction methods and project management issues. This paper presents the state of the project management education in Pakistan. The analysis is based on…

  16. Scheduling in Engineering, Project, and Production Management

    OpenAIRE

    Chien-Ho Ko

    2015-01-01

    This issue presents five papers selected from the 2013 (4th) International Conference on Engineering, Project, and Production Management (EPPM2013) held in Bangkok, Thailand. Three of the papers deal with scheduling problems faced in project and production management, while the remaining two focus on engineering management issues.

  17. [The German program for disease management guidelines. Results and perspectives].

    Science.gov (United States)

    Ollenschläger, Günter; Kopp, Ina

    2007-05-15

    The Program for National Disease Management Guidelines (German DM-CPG Program) is a joint initiative of the German Medical Association (umbrella organization of the German Chambers of Physicians), the Association of the Scientific Medical Societies (AWMF), and of the National Association of Statutory Health Insurance Physicians (NASHIP). The program aims at developing, implementing and continuously updating best-practice recommendations for countrywide and regional disease management programs in Germany. Since 2003 twelve national guidelines (topics: asthma, chronic obstructive pulmonary disease, HI (Chronic heart failure), CVD (Chronic coronary heart disease) back pain, depression, several aspects of diabetes) have been produced by use of a standardized procedure in accordance with internationally consented methodologies. For countrywide dissemination and implementation the program uses a wide range of specialist journals, continuous medical education and quality management programs. So far, 36 out of 150 national scientific medical associations, four allied health profession organizations, and twelve national consumer organizations have been participating in the DM-CPG Program. Studies to evaluate the program's effects on health-care providers' behavior and patients' outcomes are under way.

  18. New guidelines for managing cow's milk allergy in infants.

    Science.gov (United States)

    Meyer, Rosan

    2008-01-01

    The prevalence of allergic disease has increased markedly over the last 50 years. Food allergy usually manifests in early childhood as part of the so-called atopic march and most commonly includes one or more of the following foods: cow's milk, hen's egg, soy, peanuts and tree nuts, wheat, sesame seed, kiwi fruit and seafood. In the UK about 2% of infants develop cow's milk protein allergy (CMPA), but as many as 15% of infants present with symptoms suggestive of an adverse reaction to cow's milk protein. The diagnosis of CMPA is based on one or more of the following: a detailed clinical history, allergy test results (skin prick testing [SPT] and/or specific immunoglobulin E [IgE]) and, if required, supervised incremental milk challenges. The majority of UK primary care centres do not have access to these tests and may also be unfamiliar with the interpretation or results. In addition, they do not have the facilities for supervised food challenges. Empirical treatment is often required pending confirmation of allergy or referral to a specialist centre, but requires clear guidelines. No consensus guidelines currently exist for the diagnosis and management of CMPA in the UK. An international task force has recently published proposed guidelines for the management of CMPA. These provide separate algorithms covering the diagnosis and management of CMPA for both breast-fed and formula-fed infants and discuss the use of hypoallergenic formulae, elimination diets and diagnostic tests. Revisions and adaptations for the UK market are required and are discussed in this article.

  19. Draft guidelines for the environmental impact study of the Great-Whale hydroelectric project

    International Nuclear Information System (INIS)

    1992-01-01

    The draft guidelines on the preparation of Hydro-Quebec's environmental and social impact statement for the proposed Great Whale River hydroelectric project are detailed. The guidelines cover project justification, description of the biophysical and social environments, project description, impacts of the project, mitigative measures, residual impacts and compensatory measures, environmental monitoring and follow-up programs. The proponent is asked to provide the justification for the project, including its general rationale, and to evaluate the long-term impact of the project. In justifying the project, the proponent should present energy demand and supply scenarios in sufficient detail to demonstrate the need for the project within the context of sustainable development. Long term impacts on the ecosystems of James Bay and Hudson Bay must be examined, as well as broad ecosystemic impacts such as those on the boreal forest, the tundra, as well as such considerations as global warming and changes in biological and cultural diversity

  20. GUIDELINES OF CARE FOR THE MANAGEMENT OF ATOPIC DERMATITIS

    Science.gov (United States)

    Eichenfield, Lawrence F.; Tom, Wynnis L.; Chamlin, Sarah L.; Feldman, Steven R.; Hanifin, Jon M.; Simpson, Eric L.; Berger, Timothy G.; Bergman, James N.; Cohen, David E.; Cooper, Kevin D.; Cordoro, Kelly M.; Davis, Dawn M.; Krol, Alfons; Margolis, David J.; Paller, Amy S.; Schwarzenberger, Kathryn; Silverman, Robert A.; Williams, Hywel C.; Elmets, Craig A.; Block, Julie; Harrod, Christopher G.; Begolka, Wendy Smith; Sidbury, Robert

    2014-01-01

    Atopic dermatitis (AD) is a chronic, pruritic inflammatory dermatosis that affects up to 25% of children and 2–3% of adults. This guideline addresses important clinical questions that arise in AD management and care, providing updated and expanded recommendations based on the available evidence. In this first of four sections, methods for diagnosis and monitoring of disease, outcomes measures for assessment and common clinical associations that affect patients with AD are discussed. Known risk factors for the development of disease are also reviewed. PMID:24290431

  1. Danish guidelines on management of otitis media in preschool children.

    Science.gov (United States)

    Heidemann, C H; Lous, J; Berg, J; Christensen, J J; Håkonsen, S J; Jakobsen, M; Johansen, C J; Nielsen, L H; Hansen, M P; Poulsen, A; Schousboe, L P; Skrubbeltrang, C; Vind, A B; Homøe, P

    2016-08-01

    Otitis media is one of the most common diseases in small children. This underlines the importance of optimizing diagnostics and treatment of the condition. Recent literature points toward a stricter approach to diagnosing acute otitis media (AOM). Moreover, ventilating tube treatment for recurrent AOM (RAOM) and chronic otitis media with effusion (COME) has become the most frequently performed surgical procedure in pre-school children. Therefore, the Danish Health and Medicines Authority and the Danish Society of Otorhinolaryngology, Head and Neck Surgery deemed it necessary to update the Danish guidelines regarding the diagnostic criteria for acute otitis media and surgical treatment of RAOM and COME. The GRADE system (The Grading of Recommendations Assessment, Development and Evaluation) was used in order to comply with current standards of evidence assessment in formulation of recommendations. An extensive literature search was conducted between July and December 2014. The quality of the existing literature was assessed using AGREE II (Appraisal of Guidelines for Research & Evaluation), AMSTAR (assessing the Methodological Quality of Systematic Reviews), QUADAS-2 (Quality of Diagnostic Accuracy Studies), Cochrane Risk of Bias Tool for randomized trials and ACROBAT-NRSI (A Cochrane Risk of Bias Assessment Tool for Non-Randomized Studies). The working group consisted of otolaryngologists, general practitioners, pediatricians, microbiologists and epidemiologists. Recommendations for AOM diagnosis, surgical management for RAOM and COME, including the role of adenoidectomy and treatment of ventilating tube otorrhea, are proposed in the guideline. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  2. Guidelines for assessing the knowledge management maturity of organizations

    Directory of Open Access Journals (Sweden)

    C. J. Kruger

    2007-11-01

    Full Text Available In a recent article Kruger and Snyman hypothesized that progressions in knowledge management maturity (from a strategic perspective are directly related to an increased ability to speed up the strategic cycle of imitation, consolidation and innovation. The arguments proposed, however, neglected to supply the reader with a practical toolkit or even a roadmap (a time-related matrix, or questionnaire to successfully measure succession in knowledge management maturity. This article builds on the previous one and proposes a questionnaire consisting of six sections, containing 101 descriptive questions, to enable organizations to test and assess their knowledge management maturity empirically. The development of an instrument to measure knowledge management maturity required adhering to a research design that combined theoretical propositions with practical experimentation. As a point of departure, a knowledge management maturity matrix consisting of seven maturity levels was formulated. All questions contained within the matrix were benchmarked against a survey questionnaire developed by the public management service of the OECD (PUMA and were also pre-tested and validated. This process of refinement led to the formulation of the Knowledge Management Maturity Questionnaire. To avoid any taint of this research being based only on theoretical propositions, the questionnaire was tested by 178 master students of the University of Pretoria, South Africa, in nine different industries. The proposed questionnaire provides a bridge between theoretical propositions and practical usability, not only enabling knowledge management practitioners to assess the level of knowledge management maturity reached successfully but, more importantly, also serving as a guideline to institutionalize further and future knowledge management endeavours.

  3. Electronic Resources Management Project Presentation 2012

    KAUST Repository

    Ramli, Rindra M.

    2012-01-01

    This presentation describes the electronic resources management project undertaken by the KAUST library. The objectives of this project is to migrate information from MS Sharepoint to Millennium ERM module. One of the advantages of this migration

  4. Managing risks in the project pipeline.

    Science.gov (United States)

    2013-08-01

    This research focuses on how to manage the risks of project costs and revenue uncertainties over the long-term, and identifies significant : process improvements to ensure projects are delivered on time and as intended, thus maximizing the miles pave...

  5. Client's Constraining Factors to Construction Project Management

    African Journals Online (AJOL)

    factors as a significant system that constrains project management success of public and ... finance for the project and prompt payment for work executed; clients .... consideration of the loading patterns of these variables, the major factor is ...

  6. IT project management 30 steps to success

    CERN Document Server

    Doraiswamy, Premanand

    2011-01-01

    This pocket guide is designed to help IT project managers to succeed, and is based on the author's years of experience in IT project management. The guide's step-by-step approach will enable those new to IT project management, or intending to make a career in this field, to master the essential skills. For seasoned professionals, the pocket guide offers an invaluable concise reference guide.

  7. Early warnings : a phenomenon in project management

    OpenAIRE

    Nikander, Ilmari O.

    2002-01-01

    The emergence of Concurrent Engineering has caused growing demands on project management. The classic project management methods are often slow: problems may already exist when those methods are applied. The objective of the present study is to improve the opportunities of those responsible for a project's operational management to receive advance information about potential problems and final results through early warnings typical of the theory of weak signals by Igor Ansoff. The researc...

  8. Risk Management and Uncertainty in Infrastructure Projects

    DEFF Research Database (Denmark)

    Harty, Chris; Neerup Themsen, Tim; Tryggestad, Kjell

    2014-01-01

    The assumption that large complex projects should be managed in order to reduce uncertainty and increase predictability is not new. What is relatively new, however, is that uncertainty reduction can and should be obtained through formal risk management approaches. We question both assumptions...... by addressing a more fundamental question about the role of knowledge in current risk management practices. Inquiries into the predominant approaches to risk management in large infrastructure and construction projects reveal their assumptions about knowledge and we discuss the ramifications these have...... for project and construction management. Our argument and claim is that predominant risk management approaches tends to reinforce conventional ideas of project control whilst undermining other notions of value and relevance of built assets and project management process. These approaches fail to consider...

  9. Changing Pedagogical Means in Project Management

    DEFF Research Database (Denmark)

    Thorsteinsson, Uffe

    1998-01-01

    Presentation of two parts in a new concept for changing education in a university course in project management. First part concern running the couse as a project. Second part concern integrated use of Internet.......Presentation of two parts in a new concept for changing education in a university course in project management. First part concern running the couse as a project. Second part concern integrated use of Internet....

  10. Managing complex industrial change through projects

    OpenAIRE

    Perotti , Clément; Minel , Stéphanie; Benoit , Roussel; Jean , Renaud

    2010-01-01

    International audience; This paper proposes some elements showing that project is an appropriate way to manage organizational change, and that an individual change occurs during these phases. We suggest that project team should manage individual change in the framework of project for three main reasons. First, being at the crossroad of strategic and operational levels, project team is in the right position in organisation to "translate" organizational change to individuals, and vice-versa. Se...

  11. Project as a System and its Management

    Directory of Open Access Journals (Sweden)

    Jiří Skalický

    2017-06-01

    Full Text Available The contribution aims to describe project as a system, to define project control goal and strategy, control variables and their relationships. Three common control variables represented by the project triangle, are extended by two other important variables – project risk and quality. The control system consists of two components: social one – project manager and project team – and technical one – project dynamic simulation model as a decision making support of project manager in project milestones. In the project planning phase, the project baseline with planned controlled variables is created. In milestones after project launch, the actual values of these variables are measured. If the actual values deviate from planned ones, corrective actions are proposed and new baseline for the following control interval is created. Project plan takes into account the actual project progress and optimum corrective actions are determined by simulation, respecting control strategy and availability of resources. The contribution presents list of references to articles dealing with project as a system and its simulation. In most cases, they refer to the project control using the Earned Value Management method and its derivatives. Using of the dynamic simulation model for project monitoring and control, suggested in this contribution, presents a novel approach. The proposed model can serve as departure point to future research of authors and for development of appropriate and applicable tool.

  12. Quality of educational services in the field of Project management

    Directory of Open Access Journals (Sweden)

    Zlatko Barilović

    2013-12-01

    Full Text Available The growth and development of any business system depends on effectively and successfully implemented projects. Considering that the number of projects worldwide has been constantly increasing, developing project skills in individuals which will be involved in a project is of crucial importance. In the Republic of Croatia, the number of institutions offering education programmes in project management has been steadily growing. Each of these institutions will have to build its competitiveness on the marketing concept. Lately, the quality of educational services has been recognized as an increasingly important element of marketing. One of the education programmes in the field of project management in Croatia is the Specialist Graduate Professional Study Programme in Project Management offered at the Baltazar Adam Krčelić College of Business and Management in Zaprešić. In this paper the authors examine the competitiveness of the above education programme through a survey on the quality of educational service conducted in 2012 with a sample of 202 students with the aim of further defining the guidelines for improvement of its market competitiveness

  13. Lifecycle management for nuclear engineering project documents

    International Nuclear Information System (INIS)

    Zhang Li; Zhang Ming; Zhang Ling

    2010-01-01

    The nuclear engineering project documents with great quantity and various types of data, in which the relationships of each document are complex, the edition of document update frequently, are managed difficultly. While the safety of project even the nuclear safety is threatened seriously by the false documents and mistakes. In order to ensure the integrality, veracity and validity of project documents, the lifecycle theory of document is applied to build documents center, record center, structure and database of document lifecycle management system. And the lifecycle management is used to the documents of nuclear engineering projects from the production to pigeonhole, to satisfy the quality requirement of nuclear engineering projects. (authors)

  14. The Danish Agenda for Rethinking Project Management

    DEFF Research Database (Denmark)

    Svejvig, Per; Grex, Sara

    2016-01-01

    Purpose – The purpose of this paper is to analyze the similarities and differences between the Danish Re-thinking Project Management initiative named Project Half Double (PHD) and the rethinking project man-agement (RPM) research stream. The paper furthermore discusses how PHD and RPM can inspire...... ideas and local implementations. Findings – RPM and PHD share a focus on value creation, social processes, learning and complexity while PHD also focuses on lean thinking, agile thinking, front-end loading and leadership, which are largely topics beyond the RPM research stream. Originality...... a foundation for further development of both rethinking project management and Project Half Double....

  15. The Danish Agenda for Rethinking Project Management

    DEFF Research Database (Denmark)

    Svejvig, Per; Grex, Sara

    2016-01-01

    Purpose – The purpose of this paper is to analyze the similarities and differences between the Danish Re-thinking Project Management initiative named Project Half Double (PHD) and the rethinking project man-agement (RPM) research stream. The paper furthermore discusses how PHD and RPM can inspire...... a foundation for further development of both rethinking project management and Project Half Double....... each other in research and practice. Design/methodology/approach – This is an empirical paper based on collaborative research between in-dustry and researchers. PHD has developed principles and practices driven by industry consisting of 10 leading stars and the impact, leadership and flow (ILF) method...

  16. Your Project Management Coach Best Practices for Managing Projects in the Real World

    CERN Document Server

    Biafore, Bonnie

    2012-01-01

    A pragmatic approach to project management Many projects fail to deliver on time or on budget, or even to deliver a workable product that satisfies the customer. While good project management goes a long way towards ensuring success, managers often fail to follow the plans they implement. This unique guide helps you understand and successfully handle project management, once and for all. Covering practical ways to solve problems you'll typically face when managing actual projects, this pragmatic book takes you through a full project management lifecycle. You'll find ample tips, tricks, and bes

  17. Process-based software project management

    CERN Document Server

    Goodman, F Alan

    2006-01-01

    Not connecting software project management (SPM) to actual, real-world development processes can lead to a complete divorcing of SPM to software engineering that can undermine any successful software project. By explaining how a layered process architectural model improves operational efficiency, Process-Based Software Project Management outlines a new method that is more effective than the traditional method when dealing with SPM. With a clear and easy-to-read approach, the book discusses the benefits of an integrated project management-process management connection. The described tight coup

  18. PROJECT - RESOURCE MANAGEMENT OF INNOVATIONS IN EDUCATION: ANTHROPOLOGICAL PROJECTION

    Directory of Open Access Journals (Sweden)

    Galina Aleksandrovna Ignat’eva

    2015-08-01

    Full Text Available The purpose of the research was to denote a way to solve the problem of education mana-gement ΄s insufficient efficiency considered from the point of view of education opportunities to influence on the formation of mechanisms for sustainable development of society as a whole and its educational component. The concept «project-resource management of innovation in education» regarded on the basis of the anthropological project-transforming paradigm. Conceptually-categorical context presented by conceptual cluster composed of coordinated concepts «project», «resource», «educational reality», «organizational-resource potential», «project commonality». In the theoretical part of the study on the basis of analysis of the normative and exploratory approaches to educational innovations organization and management it was established the search approach ΄s leading role in the methodological substantiation of project-resource management. The study have indicated that in the presence of variable models of innovation management in education, corresponding to various predictive models of continuing education post-industrial society, project-resource management is an universal mechanism for the transition from separate innovation΄s precedents to the an authentic reality of innovative education. In the technological part of the study the main concern was to submit the project-resource management by the management goal’s system, each of which includes the specific management actions, projected results and the organizational forms. The project-resource management ΄s professional – activity context of the study showed evolution of managerial positions: an effective performer – an effective leader – strategist, implemented during the transition from directly directive management to the project management and further to the project-resource management. Based on the findings identified the key factors of initiatively-problem projects

  19. Spectrum Management Guidelines for National and Service Test and Training Ranges

    Science.gov (United States)

    2017-07-12

    Frequency Management Group RCC 700-17 SPECTRUM MANAGEMENT GUIDELINES FOR NATIONAL AND SERVICE TEST AND TRAINING RANGES DISTRIBUTION...left blank. DOCUMENT 700-01 SPECTRUM MANAGEMENT GUIDELINES FOR NATIONAL AND SERVICE TEST AND TRAINING RANGES July 2017...Prepared by RANGE COMMANDERS COUNCIL FREQUENCY MANAGEMENT GROUP Published by Secretariat Range Commanders Council U.S. Army White

  20. Adapting Project Management Practices to Research-Based Projects

    Science.gov (United States)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  1. [Interest of psychiatric guidelines in managing agitation in intensive care].

    Science.gov (United States)

    Lazignac, Coralie; Ricou, Bara; Dan, Liviu; Virgillito, Salvatore; Adam, Eric; Seyedi, Majid; Cicotti, Andrei; Azi, Amine; Damsa, Cristian

    2007-02-14

    This paper discusses the importance of psychiatric guidelines and the position of the psychiatrist in the management of agitation in the intensive care unit. The use of psychiatric validated scales to assess agitation seems to ameliorate the quality of care in psychiatry, but also in intensive care. Psychiatric experts' recommendations for managing agitation are given, which is useful to create an open discussion with the intensivists. The use of sedative medication to protect the patient, staff and to prevent an escalation of violence remains a personal choice for each practitioner, depending on individual patient needs and context. In the treatment of agitated patients, an equilibrium needs to be found between the subjective dimension and the available data from evidence based medicine.

  2. Management of acute epididymitis: are European guidelines being followed?

    Science.gov (United States)

    Drury, Nigel E; Dyer, Jonathan P; Breitenfeldt, Nicole; Adamson, Andrew S; Harrison, G S M

    2004-10-01

    Acute epididymitis is increasing in men aged 35 years or under due to sexually-transmitted Chlamydia trachomatis. This study examines whether Urological surgeons are following European guidelines for the management of acute epididymitis in these patients. A postal questionnaire survey was conducted of specialists in Urology in two regions of the UK. Of 79 completed replies, 41 (52%) take a detailed sexual history but only 34 (43%) refer patients to a Genitourinary medicine clinic. Quinolones are the most commonly prescribed first-line antibiotic by 56 (71%) respondents, principally ciprofloxacin. The current management of acute epididymitis in young men must be improved. Ciprofloxacin is not the optimal antimicrobial for the treatment of urogenital chlamydial infection. We recommend that all such patients be referred to local Genitourinary medicine services for contact-tracing and treatment of their sexual partners.

  3. Noonan syndrome: clinical features, diagnosis, and management guidelines.

    Science.gov (United States)

    Romano, Alicia A; Allanson, Judith E; Dahlgren, Jovanna; Gelb, Bruce D; Hall, Bryan; Pierpont, Mary Ella; Roberts, Amy E; Robinson, Wanda; Takemoto, Clifford M; Noonan, Jacqueline A

    2010-10-01

    Noonan syndrome (NS) is a common, clinically and genetically heterogeneous condition characterized by distinctive facial features, short stature, chest deformity, congenital heart disease, and other comorbidities. Gene mutations identified in individuals with the NS phenotype are involved in the Ras/MAPK (mitogen-activated protein kinase) signal transduction pathway and currently explain ∼61% of NS cases. Thus, NS frequently remains a clinical diagnosis. Because of the variability in presentation and the need for multidisciplinary care, it is essential that the condition be identified and managed comprehensively. The Noonan Syndrome Support Group (NSSG) is a nonprofit organization committed to providing support, current information, and understanding to those affected by NS. The NSSG convened a conference of health care providers, all involved in various aspects of NS, to develop these guidelines for use by pediatricians in the diagnosis and management of individuals with NS and to provide updated genetic findings.

  4. SRP [Salt Repository Project] configuration management plan

    International Nuclear Information System (INIS)

    1987-01-01

    This configuration management plan describes the organization, policies, and procedures that will be used on the Salt Repository Project (SRP) to implement the configuration management disciplines and controls. Configuration management is a part of baseline management. Baseline management is defined in the SRP Baseline Procedures Notebook and also includes cost and schedule baselines. Configuration management is a discipline applying technical and administrative direction and surveillance to identify and document the functional and physical characteristics of an item, to control changes to those characteristics, to record and report change processing and implementation status, and to audit the results. Configuration management is designed as a project management tool to determine and control baselines, and ensure and document all components of a project interface both physically and functionally. The purpose is to ensure that the product acquired satisfies the project's technical and operational requirements, and that the technical requirements are clearly defined and controlled throughout the development and acquisition process. 5 figs

  5. AFSC Laboratory Management Information Requirements Project

    National Research Council Canada - National Science Library

    1982-01-01

    This document was developed under the auspices of the Laboratory IRM (LIRM) Management Working Group in response to AFSC Program Directive 0008-81-1, Management Information Requirement Project (23 February 1981...

  6. Practical project management: tips, tactics, and tools

    National Research Council Canada - National Science Library

    Levine, Harvey A

    2002-01-01

    ... Elements of Resource Management 4.2 Role-based Needs for Managing Resources in a Project-driven Organization 4.3 Resource Leveling and Games of Chance 4.4 Practical Resource Scheduling 117 119 12...

  7. BTS guideline for the investigation and management of malignant pleural mesothelioma.

    Science.gov (United States)

    Woolhouse, Ian; Bishop, Lesley; Darlison, Liz; de Fonseka, Duneesha; Edey, Anthony; Edwards, John; Faivre-Finn, Corinne; Fennell, Dean A; Holmes, Steve; Kerr, Keith M; Nakas, Apostolos; Peel, Tim; Rahman, Najib M; Slade, Mark; Steele, Jeremy; Tsim, Selina; Maskell, Nick A

    2018-01-01

    The full guideline for the investigation and management of malignant pleural mesothelioma is published in Thorax . The following is a summary of the recommendations and good practice points. The sections referred to in the summary refer to the full guideline.

  8. Diffusion of a Distress Management Guideline into practice.

    Science.gov (United States)

    Tavernier, Susan S; Beck, Susan L; Dudley, William N

    2013-10-01

    The purpose of this study was to explore system and clinician-related barriers, and predictors for the adoption of the National Comprehensive Cancer Network Distress Management Guideline (DMG) into oncology outpatient practice. This descriptive, correlational study surveyed a national sample of oncology nurses working in an outpatient setting who completed the survey electronically or by mail. Study respondents (n = 409) were predominantly certified nurses (84%) yet largely unfamiliar with the DMG; 17% of respondents were using the DMG. Time, staff uncertainties and ambiguous accountability were the largest barriers to not assessing distress. Compared with those not using any assessment tool, those using the DMG were more comfortable discussing distress, worked as an oncology nurse longer, scored colleagues higher on valuing distress screening and had more organizational processes in place to support evidence-based practices. Significant predictors of DMG use included higher familiarity with the DMG (OR 3.81, p DMG, which are amenable to interventions. DMG adoption may be augmented by interventions, which increase familiarity with the guideline. Additionally, adoption of the DMG may improve through explicit articulation of the responsibilities oncology team members have in cancer-related distress screening and management. Further studies are needed to evaluate the efficacy of such interventions and their impact on patient care outcomes. Copyright © 2013 John Wiley & Sons, Ltd.

  9. Systems approach to project risk management

    Energy Technology Data Exchange (ETDEWEB)

    Kindinger, J. P. (John P.)

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  10. INFORMATION TECHNOLOGY IN INVESTMENT PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Vjacheslav A. Kozlov

    2014-01-01

    Full Text Available In the article it is proved that use of information technology today is not only something innovative distinctive feature and competitive advantage for organizations, but it is a necessary condition for effective business. The article discusses the main functionality of financial-analytical system Project Expert as an effective tool of investment project management and instrument of business planning. The main advantages which organizations get from Project Expert program use are in detail considered. Thus in the article Project Expert is considered as the effective tool of investment project management which allows to receive a number of advantages and to carry out the qualitative analysis of projects.

  11. Solid low level waste management guidelines: Final report

    International Nuclear Information System (INIS)

    Castagnacci, A.; Dalton, D.; Genoa, P.

    1994-11-01

    Since 1989, the nuclear industry has been moving in the direction of greater minimization of low level radioactive waste (LLW). This has been driven in part by increasing regulatory attention, but it also is in response to the desire on the part of nuclear utilities to be more cost efficient and to be environmentally responsive. Over the past half-dozen years, LLW disposal costs have increased dramatically. In addition, improvements in LLW volume reduction technologies have substantially reduced the volume of LLW that is disposed. At the same time, utilities are implementing aggressive source reduction programs and programs to reuse materials so as to extend the useful life of many materials. Thus, there has been a dramatic change in LLW economics and LLW management practices in just the past few years. This report was developed by utility nuclear experts to provide guidance to all utilities on mechanisms for integrating the program economics, advanced volume reduction techniques, and approaches to source reduction. Thus, utilizes will be able to use this report as a guide to optimizing their LLW program economics and minimizing LLW disposal volumes to the smallest reasonable fraction. This report discusses the implementation of these guidelines, management support, waste materials and waste inventory, radioactive tool and equipment management, protective clothing management, processing and volume reduction, solid LLW tracking, outage LLW management, and interim storage of LLW

  12. Site quality management of engineering projects

    International Nuclear Information System (INIS)

    Jiang Yiqun

    2008-01-01

    Site quality management of an engineering project of NPIC was introduced in this paper. Requirements on organization and management, interfaces, and management of interior and exterior communication were put forward, by description of quality planning, process management, process monitoring and summarizing for the engineering projects. By the management of personnel, specifications and procedures, and the control of equipment, material and work surroundings, not only the safety is ensured, but also the quality and schedule of the engineering project were guaranteed, and so the expected quality goals were achieved. (author)

  13. Spent Nuclear Fuel Project dose management plan

    International Nuclear Information System (INIS)

    Bergsman, K.H.

    1996-03-01

    This dose management plan facilitates meeting the dose management and ALARA requirements applicable to the design activities of the Spent Nuclear Fuel Project, and establishes consistency of information used by multiple subprojects in ALARA evaluations. The method for meeting the ALARA requirements applicable to facility designs involves two components. The first is each Spent Nuclear Fuel Project subproject incorporating ALARA principles, ALARA design optimizations, and ALARA design reviews throughout the design of facilities and equipment. The second component is the Spent Nuclear Fuel Project management providing overall dose management guidance to the subprojects and oversight of the subproject dose management efforts

  14. Design project management mode as the introduction

    International Nuclear Information System (INIS)

    Zhang Xiaoping

    2014-01-01

    This article consider nuclear power plant's current design schedule management mode as the introduction, analysis of current management in-depth, summed up the advantage and disadvantage of the existing management mode. It makes use of mature closed loop cycle project management, and submits progress tracking model assumptions. It also introduces the purpose and background of the progress automation model, the theoretical assumptions of the model, the design criteria and evaluation system of indicators of progress. Based on the achievement process model, this article mainly discusses the specific processes and key points of the project closed loop cycle, and the improvement of the process of project management. (author)

  15. The Management of Projects and Product Experimentation

    DEFF Research Database (Denmark)

    Lorenzen, Mark; Frederiksen, Lars

    2005-01-01

    The paper analyses management of product innovation in project-based industries, offering a view on management not only of firms, but also of markets. It first argues that projects are prominent in industries where the nature of consumer demand means that product innovation takes place...... as experimentation. Then, the paper argues that if skills needed for projects are very diverse and projects are complex, there are few internal managerial economies of projects, and the scope for management then transcends the boundaries of firms. In these cases, markets become organized in combinations of people......, contracts, and other institutions, in order to facilitate the coordination of market-based projects. While contracts play a role, a continuous, active role of knowledgeable managers (leaders and boundary spanners) is also often necessary. Such managers --- and thus (core parts of) whole industries...

  16. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    Science.gov (United States)

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  17. Project Manager Performance and the Decision to Backsource the Project Management Office

    Science.gov (United States)

    Lively, William R.

    2014-01-01

    This paper reviews a management decision of an Information Technology Outsource (ITO) provider to backshore the management oversight of its Project Management Office (PMO) after only one year of offshore operations. Governance is a term used in project management to refer to management oversight. The review is a quantitative analysis of existing…

  18. DIPLOMA PROJECT TEAM WORK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    V. S. Kruglyk

    2014-04-01

    Full Text Available During the work performance students should get the maximal approach to the process of real project execution, so the project should include the need to use the latest technology, integration of data or services with different developments, architecture design, interaction of the team members and others. Implementation of graduation projects is the useful activity for the acquisition and consolidation of key IT competencies. Since the task of educational projects is maximal close to real one, students participate almost in all typical stages of commercial product’s development, and do so successfully. This is also confirmed practically: students, who were actively engaged in some projects at the university, have key positions in IT companies of the city and country after that. The main objective of the paper is to describe the organization of a common group students’ work on a degree project, implementation peculiarity of such projects, recommendations for improving the quality of projects. Thus, the paper is devoted to the peculiarities of the joint students’ work on a project during diploma execution in IT specialties, as the final part of the acquisition and consolidation process of key IT competencies of future programmers. The problem of choosing work topic, project concept, work organization in a group, implementation process organization has been considered. Also the specific stages of software development have been considered: development of interface, choice of technology, product quality, project disposal to the next developers, project completion.

  19. Measures to improve nuclear power project management

    International Nuclear Information System (INIS)

    Ma Xinchao

    2012-01-01

    Focusing on correct application of ability level principle in setting organizational structure, the effective management system has been established, and 8 practical management regimes have been developed. Personnel training and management work shall be well done and enhanced. Experience feedback in construction management shall be well done for all systems. Exchange of construction and management techniques shall be actively carried out. All staff shall participate in safety management. KPI system is adopted for assessing stakeholders' project management method, and PDCA cycle is adopted for continued improved. Management level upgrading measures are proposed to ensure the smooth construction of nuclear power project. Setting forth and popularizing management theory can provide reference for and promote the smooth progress of various nuclear power projects. (author)

  20. Applied software risk management a guide for software project managers

    CERN Document Server

    Pandian, C Ravindranath

    2006-01-01

    Few software projects are completed on time, on budget, and to their original specifications. Focusing on what practitioners need to know about risk in the pursuit of delivering software projects, Applied Software Risk Management: A Guide for Software Project Managers covers key components of the risk management process and the software development process, as well as best practices for software risk identification, risk planning, and risk analysis. Written in a clear and concise manner, this resource presents concepts and practical insight into managing risk. It first covers risk-driven project management, risk management processes, risk attributes, risk identification, and risk analysis. The book continues by examining responses to risk, the tracking and modeling of risks, intelligence gathering, and integrated risk management. It concludes with details on drafting and implementing procedures. A diary of a risk manager provides insight in implementing risk management processes.Bringing together concepts ...

  1. Project Management Accountability System (PMAS) - Project Information and Data

    Data.gov (United States)

    Department of Veterans Affairs — The PMAS Dashboard provides a wide range of helpful data and information to assist you in project management and assessment. The drop down menu can be used to search...

  2. Adapt! – Agile Project Management Supported by Axiomatic Design

    Directory of Open Access Journals (Sweden)

    Weber Jakob

    2017-01-01

    Full Text Available This paper presents a novel approach for the use of Axiomatic Design Theory in combination with agile project management methods like Scrum for an effective, structured and combined product design and development process. Agile project management methods give a guideline how to manage a project, but there is only minor assistance regarding the actual product development process itself. Axiomatic Design can be used to support these methods in this point. In concrete terms, the results of the decomposition process of this theory can be used to formulate and structure the work packages for the agile project managing process. The Independence Axiom of Axiomatic Design Theory has a substantial contribution by ensuring the independence of the work packages which can be assigned to different project team members and can be processed independently by them. The combination of the different methods not only helps to ensure a good design solution but also helps to work more agile within a project team. The here proposed approach is one part of a holistic product design and development process for changeable production units – called Adapt! – and is described within a use case in the automotive sector.

  3. Network Security: Policies and Guidelines for Effective Network Management

    Directory of Open Access Journals (Sweden)

    Jonathan Gana KOLO

    2008-12-01

    Full Text Available Network security and management in Information and Communication Technology (ICT is the ability to maintain the integrity of a system or network, its data and its immediate environment. The various innovations and uses to which networks are being put are growing by the day and hence are becoming complex and invariably more difficult to manage by the day. Computers are found in every business such as banking, insurance, hospital, education, manufacturing, etc. The widespread use of these systems implies crime and insecurity on a global scale. In addition, the tremendous benefits brought about by Internet have also widened the scope of crime and insecurity at an alarming rate. Also, ICT has fast become a primary differentiator for institution/organization leaders as it offers effective and convenient means of interaction with each other across the globe. This upsurge in the population of organizations depending on ICT for business transaction has brought with it a growing number of security threats and attacks on poorly managed and secured networks primarily to steal personal data, particularly financial information and password.This paper therefore proposes some policies and guidelines that should be followed by network administrators in organizations to help them ensure effective network management and security of ICT facilities and data.

  4. MANAGE INTERESTED PARTIES IN PROJECT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    BILOKON A. I.

    2016-04-01

    Full Text Available The success or failure of the project often depends on factors which related to the environment, surrounded by the project and which are outside of the direct control of the project manager. The concept of the project environment, the processes of environmental analysis of the project and the ways in which managers can identify potential problems and develop a plan of action to ensure the success of the project. The management strategy the main factors of the environment includes both organizational forms and measures which aimed at the development process. For alignment of the organizational forms of communication manager must have a clear idea: what kind of interested persons and their actions (functions need to monitor, and in what form to maintain communication (bilateral relations of interdependence. This information is key to the further construction of the formal organization that supports interaction, the definition of its functions, competencies, allocation of roles, areas of responsibility, instructions, forms and methods of work. Purpose. Summarize, analyze and form an idea of the potential of existing approaches to the management of the project environment. Object of study. Management processes of the persons, who interested in the project environment. Subject of study. Methods and tools for the project management environment.

  5. Wisdom for Building the Project Manager/Project Sponsor Relationship: Partnership for Project Success

    National Research Council Canada - National Science Library

    Patton, Nanette; Shechet, Allan

    2007-01-01

    .... This article discusses conventional roles and responsibilities of the project sponsor and then discusses strategies a project manager can employ to define boundaries to reduce role confusion and promote partnership to facilitate project success.

  6. Patient participation in ERS guidelines and research projects: the EMBARC experience

    Directory of Open Access Journals (Sweden)

    James D. Chalmers

    2017-09-01

    To understand the different ways in which patients can contribute to clinical guidelines, research projects and educational activities. To understand the barriers and potential solutions to these barriers from a physician’s perspective, in order to ensure meaningful patient involvement in clinical projects. To understand the barriers and potential solutions from a patient’s perspective, in order to meaningfully involve patients in clinical projects.

  7. Spent Nuclear Fuel Project Configuration Management Plan

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1995-01-01

    This document is a rewrite of the draft ''C'' that was agreed to ''in principle'' by SNF Project level 2 managers on EDT 609835, dated March 1995 (not released). The implementation process philosphy was changed in keeping with the ongoing reengineering of the WHC Controlled Manuals to achieve configuration management within the SNF Project

  8. Comparison of community managed projects and conventional ...

    African Journals Online (AJOL)

    Comparison of community managed projects and conventional approaches in rural water supply of Ethiopia. ... African Journal of Environmental Science and Technology ... This study aimed to compare Community Managed Projects (CMP) approach with the conventional approaches (Non-CMP) in the case of Ethiopia.

  9. Sustainability in Project Management: Reality Bites

    NARCIS (Netherlands)

    Gilbert Gilbert Silvius; Ron Schipper; Snezana Nedeski

    2012-01-01

    The relationship between project management and sustainable development is rapidly gaining interest from both practitioners and academics. Studies on the integration of the concepts of sustainability into project management, approach this topic mostly from a conceptual, logical or moral point of

  10. Nuclear power project management information system

    International Nuclear Information System (INIS)

    Zou Lailong; Zhang Peng; Xiao Ziyan; Chun Zengjun; Huang Futong

    2001-01-01

    Project Management Information System is an important infrastructure facility for the construction and operation of Nuclear Power Station. Based on the practice of Lingao nuclear power project management information system (NPMIS), the author describes the NPMIS design goals, system architecture and software functionality, points out the outline issues during the development and deployment of NPMIS

  11. Analyzing Project Management Maturity Level in Indonesia

    Directory of Open Access Journals (Sweden)

    Eliot Simangunsong

    2013-04-01

    Full Text Available Project management has been generally known and increasingly used by many organizations to gain competitive advantage. In this context, many studies have proposed maturity models to evaluate how project management knowledge has been deployed effectively and efficiently in or- ganization. As a developing country, Indonesia needs many development projects managed by government and private companies in different industries. Here, a study to assess project manage- ment maturity level in Indonesian businesses may bring insight about current business practices, which is important to speed up country development and business sustainability. Adapting the Project Management Maturity Model (ProMMM, a survey instrument has been developed and ap- plied to professionals from Jakarta and surrounding area. The result of analysis shows that con- struction and primary industry have a higher maturity level compare to manufacturing and servic- es. It is to be noted, however, that the level of project management understanding is low across in- dustries. This indicates that more quality project management training or certification is required to improve overall project management knowledge in Indonesia.

  12. Improvement of Construction Project Management Processes

    Directory of Open Access Journals (Sweden)

    Nazarko, J.

    2017-07-01

    Full Text Available The common denominator of the five papers published in the current edition of the Journal of Engineering, Project, and Production Management is the improvement of construction project management processes for effective use of resources. Execution of proper project management processes is widely recognized as a key success factor influencing likelihood of project success (Alleman, 2014. It is noticeable that four out of five papers in this issue of the Journal are authored or co-authored by Iranian researchers from the same Institute but their conclusions bear importance that cannot be limited to the authors’ region.

  13. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  14. Reflexive project management in high-abition projects

    NARCIS (Netherlands)

    Loeber, Anne; Vermeulen, T.

    2016-01-01

    Purpose
    The Aristotelian notion of phronèsis inspired innovative work in the realm of project management as well as in literature on sustainability and societal transformations. We argue that both literatures may benefit from a dialogue between the two, especially in view of outlining project

  15. Client's constraining factors to construction project management ...

    African Journals Online (AJOL)

    This study analyzed client's related factors that constrain project management success of public and private sector construction in Nigeria. Issues that concern clients in any project can not be undermined as they are the owners and the initiators of project proposals. It is assumed that success, failure or abandonment of ...

  16. INTEGRATION OF PROGRESS STRATEGY IN PROJECT MANAGEMENT

    OpenAIRE

    Дмитрий Георгиевич БЕЗУГЛЫЙ

    2015-01-01

    The methods and tools of the developed project promotion, the planning system of promotion strategy are suggested; the main approaches used in the project promotion have been identified. The conclusions about the importance, necessity and role in the promotion of a holistic project management system have been made.

  17. Communication Scaffolds for Project Management in PBL

    Science.gov (United States)

    Sasaki, Shigeru; Arai, Masayuki; Takai, Kumiko; Ogawa, Mitsuhiro; Watanabe, Hiroyoshi

    2017-01-01

    In this study, the role-playing situation and the system requirement list are adopted into project-based learning classes to develop web applications. In the classes, the third-year undergraduate project managers communicate with the client of the project rolled by teachers on the Web bulletin board. These are expected to act as scaffolds to…

  18. The Impact of Project Management Maturity upon IT/IS Project Management Outcomes

    Science.gov (United States)

    Carcillo, Anthony Joseph, Jr.

    2013-01-01

    Although it is assumed that increasing the institutionalization (or maturity) of project management in an organization leads to greater project success, the literature has diverse views. The purpose of this mixed methods study was to examine the correlation between project management maturity and IT/IS project outcomes. The sample consisted of two…

  19. Project managing your simulator DCS upgrade

    International Nuclear Information System (INIS)

    Carr, S.

    2006-01-01

    The intention of this paper is to provide helpful information and tips for the purchaser with regard to the project management of a DCS upgrade for an existing nuclear power station operator-training simulator. This paper was written shortly after STS Powergen completed two nuclear power station simulator DCS projects in the USA. Areas covered by this paper are: - Contractual documents and arrangements; - Licence and Escrow agreements; - Liquidated damages; - Project management; - Project schedules and resources; - Monitoring progress; - Defect reporting; - DCS automation code; - Access to proprietary information; - Tips for project meetings; - Testing; - Cultural issues; - Training

  20. Project Management in the Finnish Music Industry

    OpenAIRE

    Hypén, Joel

    2009-01-01

    The term project is a widely used phrase in today’s working life. This thesis explains what project management theory is, how it has evolved through history and how it is applied in managing modern business projects in the contexts of the Finnish music business sector. The literature review contains a description of the key phases a project is typically organised in as well as the terms and tools used to plan and run a successful project. Through qualitative research means the thesis inves...

  1. The Fast Forward MBA in Project Management

    CERN Document Server

    Verzuh, Eric

    2011-01-01

    An updated and revised edition of the bestselling guide to managing projects For any professional responsible for coordinating projects among different departments, across executive levels, or with technical complexity, The Fast Forward MBA in Project Management offers comprehensive instruction on how to deliver on time and on budget. Get the step-by-step advice you need to find the right sponsor, clarify objectives, and set realistic schedules and budget projections. This Fourth Edition of the 200,000-copy bestseller now covers critical new topics including: software and IT projects, agile te

  2. [Management of valvular heart disease : ESC/EACTS guidelines 2017].

    Science.gov (United States)

    Haude, M

    2017-12-01

    After 5 years the European Society of Cardiology and the European Association for Cardio-Thoracic Surgery have released an update on the guidelines for the management of valvular heart diseases. In recent years published results of randomized trials in patients with aortic valve stenosis have resulted in updated recommendations for catheter-based prosthesis implantation (TAVI), which is now extended to patients presenting without a low risk for conventional surgical valve replacement. In mitral or tricuspid valvular disease, the recommendations for catheter-based therapies are less strong because of a lack of supportive scientific data. A special focus of these updated guidelines is on concomitant antithrombotic therapy in valvular heart disease and in the context of a combination with coronary artery disease and/or accompanying arrhythmia. Special emphasis was again put on the multidisciplinary heart team for the diagnostics and treatment of patients with valvular heart disease. In order to support the quality of treatment for patients with valvular heart disease, it is suggested that heart valve centers of excellence should be established, which have to fulfil complex personnel, structural and technological prerequisites.

  3. Project management training : final report.

    Science.gov (United States)

    2011-01-01

    In 2005 the Indiana Department of Transportation (INDOT) went through a complete reorganization of its operations going from centralized to decentralized (District) management. This reorganization gave Districts autonomy to manage construction projec...

  4. Project management training : [technical summary].

    Science.gov (United States)

    2011-01-01

    In 2005, the Indiana Department of Transportation (INDOT) went through a complete reorganization of its operations going from centralized to decentralized (District) management. This reorganization gave Districts autonomy to manage construction proje...

  5. Making Things Happen Mastering Project Management

    CERN Document Server

    Berkun, Scott

    2008-01-01

    In the updated edition of this critically acclaimed and bestselling book, Microsoft insider Scott Berkun offers a collection of essays on field-tested philosophies and strategies for defining, leading, and managing projects. Based on his nine years of experience as a program manager for Microsoft's biggest projects, Berkun explains to technical and non-technical readers alike what it takes to get through a large software or web development project.

  6. Multifamily Retrofit Project Manager Job/Task Analysis and Report: September 2013

    Energy Technology Data Exchange (ETDEWEB)

    Owens, C. M.

    2013-09-01

    The development of job/task analyses (JTAs) is one of three components of the Guidelines for Home Energy Professionals project and will allow industry to develop training resources, quality assurance protocols, accredited training programs, and professional certifications. The Multifamily Retrofit Project Manager JTA identifies and catalogs all of the tasks performed by multifamily retrofit project managers, as well as the knowledge, skills, and abilities (KSAs) needed to perform the identified tasks.

  7. Using electronic document management systems to manage highway project files.

    Science.gov (United States)

    2011-12-12

    "WisDOTs Bureau of Technical Services is interested in learning about the practices of other state departments of : transportation in developing and implementing an electronic document management system to manage highway : project files"

  8. Management evolution in the LSST project

    Science.gov (United States)

    Sweeney, Donald; Claver, Charles; Jacoby, Suzanne; Kantor, Jeffrey; Krabbendam, Victor; Kurita, Nadine

    2010-07-01

    The Large Synoptic Survey Telescope (LSST) project has evolved from just a few staff members in 2003 to about 100 in 2010; the affiliation of four founding institutions has grown to 32 universities, government laboratories, and industry. The public private collaboration aims to complete the estimated $450 M observatory in the 2017 timeframe. During the design phase of the project from 2003 to the present the management structure has been remarkably stable. At the same time, the funding levels, staffing levels and scientific community participation have grown dramatically. The LSSTC has introduced project controls and tools required to manage the LSST's complex funding model, technical structure and distributed work force. Project controls have been configured to comply with the requirements of federal funding agencies. Some of these tools for risk management, configuration control and resource-loaded schedule have been effective and others have not. Technical tasks associated with building the LSST are distributed into three subsystems: Telescope & Site, Camera, and Data Management. Each sub-system has its own experienced Project Manager and System Scientist. Delegation of authority is enabling and effective; it encourages a strong sense of ownership within the project. At the project level, subsystem management follows the principle that there is one Board of Directors, Director, and Project Manager who have overall authority.

  9. General guidelines for the assessment of internal dose from monitoring data: Progress of the IDEAS project

    International Nuclear Information System (INIS)

    Doerfel, H.; Andrasi, A.; Bailey, M.; Blanchardon, E.; Cruz-Suarez, R.; Berkovski, V.; Castellani, C. M.; Hurtgenv, C.; Leguen, B.; Malatova, I.; Marsh, J.; Stather, J.; Zeger, J.

    2007-01-01

    In recent major international intercomparison exercises on intake and internal dose assessments from monitoring data, the results calculated by different participants varied significantly. Based on this experience the need for harmonisation of the procedures has been formulated within an EU 5. Framework Programme research project. The aim of the project, IDEAS, is to develop general guidelines for standardising assessments of intakes and internal doses. The IDEAS project started in October 2001 and ended in June 2005. The project is closely related to some goals of the work of Committee 2 of the ICRP and since 2003 there has been close cooperation between the two groups. To ensure that the guidelines are applicable to a wide range of practical situations, the first step was to compile a database of well-documented cases of internal contamination. In parallel, an improved version of an existing software package was developed and distributed to the partners for further use. A large number of cases from the database was evaluated independently by the partners and the results reviewed. Based on these evaluations, guidelines were drafted and discussed with dosimetry professionals from around the world by means of a virtual workshop on the Internet early in 2004. The guidelines have been revised and refined on the basis of the experiences and discussions in this virtual workshop. The general philosophy of the Guidelines is presented here, focusing on the principles of harmonisation, optimisation and proportionality. Finally, the proposed Levels of Task to structure the approach of internal dose evaluation are reported. (authors)

  10. Guidelines for the clinical management of familial adenomatous polyposis (FAP)

    DEFF Research Database (Denmark)

    Vasen, H.F.; Moslein, G.; Alonso, A.

    2008-01-01

    BACKGROUND: Familial adenomatous polyposis (FAP) is a well-described inherited syndrome, which is responsible for cancer (CRC) cases. The syndrome is characterised by the development of hundreds to thousands of adenomas in the colorectum. Almost all patients will develop CRC...... if they are not identified and treated at an early stage. The syndrome is inherited as an autosomal dominant trait and caused by mutations in the APC gene. Recently, a second gene has been identified that also gives rise to colonic adenomatous polyposis, although the phenotype is less severe than typical FAP. The gene...... is the MUTYH gene and the inheritance is autosomal recessive. In April 2006 and February 2007, a workshop was organised in Mallorca by European experts on hereditary gastrointestinal cancer aiming to establish guidelines for the clinical management of FAP and to initiate collaborative studies. Thirty...

  11. Project management in interior design services

    OpenAIRE

    Şahinoglu, Alp

    1997-01-01

    Ankara : Bilkent University, Department of Interior Architecture and Environmental Design and Institute of Fine Arts, 1997. Thesis (Master's) -- Bilkent University, 1997. Includes bibliographical references. In this study, the concept of project management is analyzed within the framework of interior design services. Project management has been defined as the managing and coordination of all human and physical resources, in order to accomplish the predetermined goals (aim of the proj...

  12. Dutch guideline for the management of hypertensive crisis -- 2010 revision.

    Science.gov (United States)

    van den Born, B J H; Beutler, J J; Gaillard, C A J M; de Gooijer, A; van den Meiracker, A H; Kroon, A A

    2011-05-01

    Hypertensive crises are divided into hypertensive urgencies and emergencies. Together they form a heterogeneous group of acute hypertensive disorders depending on the presence or type of target organs involved. Despite better treatment options for hypertension, hypertensive crisis and its associated complications remain relatively common. In the Netherlands the number of patients starting renal replacement therapy because of 'malignant hypertension' has increased in the past two decades. In 2003, the first Dutch guideline on hypertensive crisis was released to allow a standardised evidence-based approach for patients presenting with a hypertensive crisis. In this paper we give an overview of the current management of hypertensive crisis and discuss several important changes incorporated in the 2010 revision. These changes include a modification in terminology replacing 'malignant hypertension' with 'hypertensive crisis with retinopathy and reclassification of hypertensive crisis with retinopathy under hypertensive emergencies instead of urgencies. With regard to the treatment of hypertensive emergencies, nicardipine instead of nitroprusside or labetalol is favoured for the management of perioperative hypertension, whereas labetalol has become the drug of choice for the treatment of hypertension associated with pre-eclampsia. For the treatment of hypertensive urgencies, oral administration of nifedipine retard instead of captopril is recommended as first-line therapy. In addition, a section on the management of hypertensive emergencies according to the type of target organ involved has been added. Efforts to increase the awareness and treatment of hypertension in the population at large may lower the incidence of hypertensive crisis and its complications.

  13. Project network-oriented materials management policy for complex projects

    DEFF Research Database (Denmark)

    Dixit, Vijaya; Srivastava, Rajiv K; Chaudhuri, Atanu

    2015-01-01

    This work devises a materials management policy integrated with project network characteristics of complex projects. It proposes a relative quantitative measure, overall criticality (OC), for prioritisation of items based on penalty incurred due to their non-availability. In complex projects...... managerial tacit knowledge which provides them enough flexibility to provide information in real form. Computed OC values can be used for items prioritisation and as shortage cost coefficient in inventory models. The revised materials management policy was applied to a shipbuilding project. OC values were......, practicing managers find it difficult to measure OC of items because of the subjective factors and intractable nature of penalties involved. However, using their experience, they can linguistically identify the antecedents and relate them to consequent OC. This work adopts Fuzzy Set Theory to capture...

  14. Project brief of pre-contract in project management

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim; Mohd Azmi Sidid Omar; Abdul Rahman Norazumin; Zakaria Dris; Abdul Murad Abu Bakar; Alwi Othman

    2010-01-01

    Project brief is a comprehensive document used in translating the user needs and requirement for the project implementation. This document is important for the designer as a main guidance towards establishing project details. Research shown that problem usually arises from not well-defined scope and needs by the user. With lack of information the designer tend to assume and interprets wrong translation. Other issues arise from project management are time, cost, budgetary, lack of communication and establishing quality management. Some ideas of improvement were gain by doing cross reference with JKR quality system management, workshop and brainstorming. It shows that an improvement of data collection system has to be integrating with some basic format details, drawings and declaration forms to be established. (author)

  15. Business Intelligence Support For Project Management

    OpenAIRE

    Muntean, Mihaela; Cabau, Liviu Gabiel

    2013-01-01

    With respect to the project management framework, a project live cycle consists of phases like: initiation, planning, execution, monitoring & control and closing. Monitoring implies measuring the progress and performance of the project during its execution and communicating the status. Actual performance is compared with the planned one. Therefore, a minimal set of key performance indicators will be proposed. Monitoring the schedule progress, the project budget and the scope will be possible....

  16. Comparisons on International Approaches of Business and Project Risk Management

    OpenAIRE

    Nadia Carmen ENE

    2005-01-01

    In this article we intend to present a comparative approach between three recognized international methodologies for risk management: RISKMAN, Project Management Institute Methodology-PMBoK and Project Risk Analysis and Management Guide (produced by Association for Project Management).

  17. SYSTEM DYNAMICS OF MANAGEMENT OF "UNFORESEEN CIRCUMSTANCES" OF THE PROJECT

    Directory of Open Access Journals (Sweden)

    Богдан Владимирович ГАЙДАБРУС

    2015-05-01

    Full Text Available Approaches for project contingency management through risk management and influence of stakeholders. Proposed system dynamic contingency project management model. The model describes the effects of various factors on the phase of project management through contingency.

  18. SYSTEM DYNAMICS OF MANAGEMENT OF "UNFORESEEN CIRCUMSTANCES" OF THE PROJECT

    OpenAIRE

    Богдан Владимирович ГАЙДАБРУС; Евгений Анатольевич ДРУЖИНИН

    2015-01-01

    Approaches for project contingency management through risk management and influence of stakeholders. Proposed system dynamic contingency project management model. The model describes the effects of various factors on the phase of project management through contingency.

  19. Guidelines for the Detection and Management of Lead Poisoning for Physicians and Health Care Providers.

    Science.gov (United States)

    Illinois State Dept. of Public Health, Springfield.

    These Illinois guidelines provide information on the medical management and treatment of children with lead poisoning, based on Federal guidelines (revised in 1991) for determining lead poisoning at lower levels. The guidelines outline the effects of lead poisoning, sources of lead, estimated incidence of lead poisoning in Illinois, screening…

  20. Framework for managing uncertainty in property projects

    NARCIS (Netherlands)

    Reymen, I.M.M.J.; Dewulf, G.P.M.R.; Blokpoel, S.B.

    2008-01-01

    A primary task of property development (or real estate development, RED) is making assessments and managing risks and uncertainties. Property managers cope with a wide range of uncertainties, particularly in the early project phases. Although the existing literature addresses the management of

  1. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  2. Project management for economical nuclear energy

    International Nuclear Information System (INIS)

    Majerle, P.P.

    2005-01-01

    The price of electricity is significantly influenced by the cost of the initial generation asset. The cost of the initial nuclear generation asset is significantly influenced by the design and construction duration. Negative variations in the cost and duration of actual design and construction have historically impacted the early relative economics of nuclear power generation. Successful management of plant design information will mitigate the risks of the design and construction of future nuclear plants. Information management tools that can model the integrated delivery of large complex projects enable the project owners to accurately evaluate project progress, as well as the economic impact of regulatory, political, or market activities not anticipated in the project execution plan. Significant differences exist in the electrical energy markets, project delivery models, and fuel availability between continents and countries. However, each market and project delivery model is challenged by the need to produce economical electrical energy. The information management system presented in this paper provides a means to capture in a single integrated computerized database the design information developed during plant design, procurement, and construction and to allow this information to be updated and retrieved in real time by all project participants. Utilization of the information management system described herein will enable diverse project teams to rapidly and reliably input, share, and retrieve power plant information, thereby supporting project management's goal to make good on its commitment to the economic promise of tomorrow's nuclear electrical power generation by achieving cost-effective construction. (authors)

  3. Effective Safety Management in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.

  4. 36 CFR 292.42 - Management standards and guidelines.

    Science.gov (United States)

    2010-07-01

    ... guidelines. 292.42 Section 292.42 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF... standards and guidelines. (a) In addition to existing statutory and regulatory authority governing administration of National Forest System lands and resources, the standards and guidelines in §§ 292.43 to 292.48...

  5. Project management of radwaste retrofits

    International Nuclear Information System (INIS)

    Vaught, D.L.

    1988-01-01

    Many utilities are finding it necessary to provide additional radioactive waste processing facilities at operating or nearly completed nuclear stations in order to accommodate the ever-changing regulatory, political and socio-economic environment in which we operate. This paper describes the project approach taken at Duke Power Company to provide a comprehensive radioactive waste processing facility at Oconee Nuclear Station. Following a historical perspective, the philosophy and mechanics of the project team are discussed. The goal of the project team was to provide a facility which could meet the liquid and solid radioactive waste processing needs of Oconee within the restraints of a utility budget and schedule. The unique quality of the project team approach was the integral involvement of all of the necessary departments in every part of the design, construction and start-up phases. The project team thereby utilized feedback from over thirty reactor years of operational experience. The remainder of the paper provides examples of the problems encountered and their resolution (eg. equipment layout, materials handling, vendor improvements and regulatory changes all required design-in-progress changes). It has been the integration and concentration of the diverse resources of a large utility into a cross-departmental team which has allowed the timely resolution of the necessary changes. This same philosophy is being applied to the facility start-up program and to other major projects at Duke Power Company

  6. Automated transportation management system (ATMS) software project management plan (SPMP)

    Energy Technology Data Exchange (ETDEWEB)

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  7. Bottomland Hardwood Ecosystem Management Project

    Science.gov (United States)

    John A. Stanturf; Calvin E. Meier

    1994-01-01

    Federal agency approaches to land management are undergoing a shift from parcel-specific concerns toward a more holistic, ecosystem management approach. Southern bottomland hardwood ecosystems provide important environmental services and commodity goods (Wharton et al. 1982), yet much of our knowledge of these systems comes from anecdotal information. The Bottomland...

  8. Medical management of patients after bariatric surgery: Principles and guidelines

    Science.gov (United States)

    Elrazek, Abd Elrazek Mohammad Ali Abd; Elbanna, Abduh Elsayed Mohamed; Bilasy, Shymaa E

    2014-01-01

    Obesity is a major and growing health care concern. Large epidemiologic studies that evaluated the relationship between obesity and mortality, observed that a higher body-mass index (BMI) is associated with increased rate of death from several causes, among them cardiovascular disease; which is particularly true for those with morbid obesity. Being overweight was also associated with decreased survival in several studies. Unfortunately, obese subjects are often exposed to public disapproval because of their fatness which significantly affects their psychosocial behavior. All obese patients (BMI ≥ 30 kg/m2) should receive counseling on diet, lifestyle, exercise and goals for weight management. Individuals with BMI ≥ 40 kg/m2 and those with BMI > 35 kg/m2 with obesity-related comorbidities; who failed diet, exercise, and drug therapy, should be considered for bariatric surgery. In current review article, we will shed light on important medical principles that each surgeon/gastroenterologist needs to know about bariatric surgical procedure, with special concern to the early post operative period. Additionally, we will explain the common complications that usually follow bariatric surgery and elucidate medical guidelines in their management. For the first 24 h after the bariatric surgery, the postoperative priorities include pain management, leakage, nausea and vomiting, intravenous fluid management, pulmonary hygiene, and ambulation. Patients maintain a low calorie liquid diet for the first few postoperative days that is gradually changed to soft solid food diet within two or three weeks following the bariatric surgery. Later, patients should be monitored for postoperative complications. Hypertension, diabetes, dumping syndrome, gastrointestinal and psychosomatic disorders are among the most important medical conditions discussed in this review. PMID:25429323

  9. Identity and the Management Project

    DEFF Research Database (Denmark)

    Jørgensen, Kenneth Mølbjerg; Dehlin, Erlend

    The paper discusses the concept of identity in relation to management. We take our starting point in Wittgenstein’s concept language games. We argue that identity is a question of using linguistic tools to construct reality. Two elements of the language game metaphor are central here: rules...... and family resemblance. As such, managing identity in organizations is closely linked to rules and family resemblance. Organizations manage identity through the definition of norms and values for right or wrong, appropriate or inappropriate, to name but a few. Norms and values are important as reference...... points for constructing identities. Managing identity has become more important because the rules-of-the-game have become more unstable. Managing identity is important if the bonds between individuals and organizations are to be sustained. But this task is contradictory and paradoxical of its very nature...

  10. Nuclear project management experience in Korea

    International Nuclear Information System (INIS)

    Jae-Pung Jeon

    1987-01-01

    Korea Electric Power Corporation (KEPCO) has been dereloping nuclear power steadily over last 30 years to support effective economic growth of the nation with cheap electric power. In the course of development, KEPCO has experienced various project management patterns diverging from turn-key contracts with foreign vendors to non-turnkey with local affiliates. To culative own project management capabilities, one has to pay continuous efforts for better management systems development and manpower training. KEPCO is ready to share its priceless experiences gained over last three decades of nuclear project operation with any developing nation. (Liu)

  11. Management of projects for energy efficiency

    Directory of Open Access Journals (Sweden)

    Vuković Miodrag M.

    2014-01-01

    Full Text Available In an effort to lower operating costs and improve competitiveness, many organizations today are preparing projects in the field of energy saving. On the other hand, companies that provide energy services and implement these projects, need to build competences in this area to well manage the projects which are subject to energy savings and by this to justify the confidence of investors. This paper presents research that shows the most important factors for the development of local capacity in project management in the field of energy efficiency.

  12. Strategic management of HLW repository projects

    International Nuclear Information System (INIS)

    Bartlett, J.W.

    1984-01-01

    This paper suggests an approach to strategic management of HLW repository projects based on the premise that a primary objective of project activities is resolution of issues. The approach would be implemented by establishing an issues management function with responsibility to define the issues agenda, develop and apply the tools for assessing progress toward issue resolution, and develop the issue resolution criteria. A principal merit of the approach is that it provides a defensible rationale for project plans and activities. It also helps avoid unnecessary costs and schedule delays, and it helps assure coordination between project functions that share responsibilities for issue resolution

  13. Competency model for the project managers of technical projects

    Science.gov (United States)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  14. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    Science.gov (United States)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  15. Aging management guidelines for commercial nuclear power plant equipment

    International Nuclear Information System (INIS)

    Nakos, J.T.; Gazdzinski, R.F.; Toman, G.J.

    1994-01-01

    The US Department of Energy, in cooperation with the Electric Power Research Institute and nuclear power plant utilities, has prepared ''Aging Management Guidelines'' (AMGs) for commodity types of equipment (e.g., pumps, electrical switchgear) important to license renewal. For the most part, this is also consistent with the Maintenance Rule, 10 CFR 50.65 (1991). AMGs concentrate on technical, (not licensing) issues and are directed toward systems engineers and plant maintenance staff. AMGs include a detailed summary of operating history, stressors, aging mechanisms, and various types of maintenance practices that can be combined to create effective programs that manage aging. All aging mechanisms were addressed; no attempt was made to limit the evaluation to aging mechanisms ''unique to license renewal,'' as defined in the License Renewal Rule, 10 CFR 54 (1991). The first AMG on Electrical Switchgear was published in July 1993. Six (6) additional AMGs will be published by the first quarter of calendar year 1994. It is anticipated that two more AMGs will be started in 1994. The seven ongoing AMG topics are as follows: (1) battery chargers, inverters and uninterruptible power supplies; (2) batteries, stationary; (3) heat exchangers; (4) motor control centers; (5) pumps; (6) switchgear, electric; (7) transformers, power and distribution. In Section 7, industry feedback regarding AMGs is discussed. Overall, the response has been very positive

  16. Complex socio-technical systems: Characterization and management guidelines.

    Science.gov (United States)

    Righi, Angela Weber; Saurin, Tarcisio Abreu

    2015-09-01

    Although ergonomics has paid increasing attention to the perspective of complexity, methods for its operationalization are scarce. This study introduces a framework for the operationalization of the "attribute view" of complexity, which involves: (i) the delimitation of the socio-technical system (STS); (ii) the description of four complexity attributes, namely a large number of elements in dynamic interactions, a wide diversity of elements, unexpected variability, and resilience; (iii) the assessment of six management guidelines, namely design slack, give visibility to processes and outcomes, anticipate and monitor the impacts of small changes, monitor the gap between prescription and practice, encourage diversity of perspectives when making decisions, and create an environment that supports resilience; and (iv) the identification of leverage points for improving the STS design, based on both the analysis of relationships among the attributes and their classification as irreducible/manageable complexity, and liability/asset. The use of the framework is illustrated by the study of an emergency department of a University hospital. Data collection involved analysis of documents, observations of work at the front-line, interviews with employees, and the application of questionnaires. Copyright © 2015 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  17. Guidelines for Quality Management of Apallic Syndrome / Vegetative State.

    Science.gov (United States)

    von Wild, Klaus; Gerstenbrand, Franz; Dolce, Giuliano; Binder, Heinrich; Vos, Pieter E; Saltuari, Leopold; Alekseenko, Yuri; Formisano, Rita; Ritz, Annegret; Ortega-Suhrkamp, Erika; Jörg, Johannes R; Potapov, Alexander A; León-Carrión, José; Vilcinis, Rimantas; Zitnay, George A

    2007-06-01

    Epidemiology in Europe shows constantly increasing figures for the apallic syndrome (AS)/vegetative state (VS) as a consequence of advanced rescue, emergency services, intensive care treatment after acute brain damage and high-standard activating home nursing for completely dependent end-stage cases secondary to progressive neurological disease. Management of patients in irreversible permanent AS/VS has been the subject of sustained scientific and moral-legal debate over the past decade. A task force on guidelines for quality management of AS/VS was set up under the auspices of the Scientific Panel Neurotraumatology of the European Federation of Neurological Societies to address key issues relating to AS/VS prevalence and quality management. Collection and analysis of scientific data on class II (III) evidence from the literature and recommendations based on the best practice as resulting from the task force members' expertise are in accordance with EFNS Guidance regulations. The overall incidence of new AS/VS full stage cases all etiology is 0.5-2/100.000 population per year. About one third are traumatic and two thirds non traumatic cases. Increasing figures for hypoxic brain damage and progressive neurological disease have been noticed. The main conceptual criticism is based on the assessment and diagnosis of all different AS/VS stages based solely on behavioural findings without knowing the exact or uniform pathogenesis or neuropathological findings and the uncertainty of clinical assessment due to varying inclusion criteria. No special diagnostics, no specific medical management can be recommended for class II or III AS treatment and rehabilitation. This is why sine qua non diagnostics of the clinical features and appropriate treatment of AS/VS patients of "AS full, remission, defect and end stages" require further professional training and expertise for doctors and rehabilitation personnel. Management of AS aims at the social reintegration of patients or has

  18. Use of clinical practice guidelines to promote best practice when managing clinical interventions for liver transplant candidates.

    Science.gov (United States)

    Jarrett, Maree

    2009-06-01

    Limited organ availability and an increasing demand for organ transplantation has extended transplant waiting times and thus increased morbidity and mortality for potential recipients on waiting lists. The Queensland Liver Transplant Service identified use of clinical practice guidelines developed from evidence-based practice as a strategic clinical management/workflow tool that could improve clinical outcomes for patients awaiting liver transplant. An extensive review of publications related to the management of advanced liver disease in potential transplant recipients was undertaken and the supporting evidence was identified. In all stages of development of the guidelines, the multidisciplinary collaborative team of clinicians used recommended principles from The Appraisal of Guidelines, Research and Evaluation collaboration. The liver transplant recipient coordinator acted as facilitator for the project, identifying positive factors and resolving obstacles. Key focus areas in optimizing medical management before liver transplant were identified with the aim of preventing disease progression and complications that would jeopardize patients' outcome. Clinical practice guidelines were developed for each key area to optimize care by promoting appropriate timing of clinical interventions. Practices that required change to comply with identified best practice were investigated, and clinical practice for the outpatient medical management of potential liver transplant recipients with chronic liver disease were developed collaboratively. These guidelines have been accepted and are being implemented within the gastroenterology and hepatology department at the Princess Alexandra Hospital.

  19. Globalization And Knowledge Management In Projects

    Directory of Open Access Journals (Sweden)

    Bubel Dagmara

    2015-06-01

    Full Text Available Knowledge management is a field of management dealing with the use of knowledge, methods, and tools to effectively coordinate complex and unique projects. In accordance with this definition, project knowledge can be treated as a useful resource of information that allows projects to be implemented in compliance with its objectives: time, costs, and quality of results. Knowledge in the activity of an organization, including in the implementation of projects, has for many years been an area of interest to researchers, who confirmed its key importance for building permanent competitive advantages of companies and enterprises. In project management, this issue takes on a new character, as it is transferred to the field of dynamic, time restricted, temporary, and team-implemented projects. The aim of this paper is to present the results of a survey regarding the use of practices of knowledge management in projects in international organizations and to show that the concept of knowledge management in projects is a tool conducive to spreading the process of globalization.

  20. EMF Rapid Program Engineering Projects, Project 1, Development of Recommendations for Guidelines for Field Source Measurement

    Energy Technology Data Exchange (ETDEWEB)

    Electric Research and Management, Inc.

    1997-03-11

    The goal of this project is to develop a protocol for measuring the electric and magnetic fields around sources. Data from these measurements may help direct future biological effects research by better defining the complexity of magnetic and electric fields to which humanity is exposed, as well asprovide the basis for rigorous field exposure analysis and risk assessment once the relationship between field exposure and biological response. is better understood. The data base also should have sufficient spatial and temporal characteristics to guide electric and magnetic field management. The goal of Task A is to construct a set of characteristics that would be ideal to have for guiding and interpreting biological studies and for focusing any future effort at field management. This ideal set will then be quantified and reduced according to the availability (or possible development of) instrumentation to measure the desired characteristics. Factors that also will be used to define pragmatic data sets will be the cost of collecting the data, the cost of developing an adequate data base, and the needed precision in measuring specific characteristics. A field, electric or magnetic, will always be ,some function of time and space. The first step in this section of the protocol development will be to determine what span of time and what portion of space are required to quantify the electric and magnetic fields around sources such as appliances and electrical apparatus. Constraints on time will be set by examining measurement limitations and biological data requirements.

  1. Risk management methodology for RBMN project

    International Nuclear Information System (INIS)

    Borssatto, Maria F.B.; Tello, Cledola C.O.; Uemura, George

    2013-01-01

    RBMN Project has been developed to design, construct and commission a national repository to dispose the low- and intermediate-level radioactive wastes from the operation of nuclear power plants and other industries that use radioactive sources and materials. Risk is a characteristic of all projects. The risks arise from uncertainties due to assumptions associated with the project and the environment in which it is executed. Risk management is the method by which these uncertainties are systematically monitored to ensure that the objectives of the project will be achieved. Considering the peculiarities of the Project, that is, comprehensive scope, multidisciplinary team, apparently polemic due to the unknowing of the subject by the stake holders, especially the community, it is being developed a specific methodology for risk management of this Project. This methodology will be critical for future generations who will be responsible for the final stages of the repository. It will provide greater guarantee to the processes already implemented and will maintain a specific list of risks and solutions for this Project, ensuring safety and security of the repository throughout its life cycle that is the planned to last at least three hundred years. This paper presents the tools and processes already defined, management actions aimed at developing a culture of proactive risk in order to minimize threats to this Project and promote actions that bring opportunities to its success. The methodology is based on solid research on the subject, considering methodologies already established and globally recognized as best practices for project management. (author)

  2. An Approach for Implementation of Project Management Information Systems

    Science.gov (United States)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  3. Belene NPP project configuration management

    International Nuclear Information System (INIS)

    Matveev, A.

    2009-01-01

    The configuration management includes: change identification; change assessment; change coordination; change approval or rejection; Change introduction. One of the main tasks while implementing the above processes is the analysis of the effect of one change upon all the related elements

  4. Consensus on the guidelines for the dietary management of classical galactosemia.

    Science.gov (United States)

    Kerckhove, Kristel Vande; Diels, Marianne; Vanhaesebrouck, Sigrid; Luyten, Karin; Pyck, Nancy; De Meyer, An; Van Driessche, Marleen; Robert, Martine; Corthouts, Karen; Caris, Ariane; Duchateau, Emilie; Dassy, Martine; Bihet, Genevieve

    2015-02-01

    Worldwide there is scientific discussion about the dietary management of galactosemia. The dietary management is very different in several countries among Europe, the US and Canada. The main points of discussion are related to the fact that i) despite a strict diet some patients still have poor outcomes; ii) there is lack of scientific knowledge about the role of endogenous production of galactose on disease evolution, with or without diet. The aim of the current work was the creation of a Belgian consensus on dietary guidelines for the management of galactosemia. A step-wise approach was used to achieve a consensus, including: a workshop, a Delphi round, discussion groups and a round table of different Belgian experts. The consensus is an agreement between strict guidelines (strict limitation of fruits, vegetables and soybean products/French guidelines) and the more liberal guidelines (comparable with a diet free of lactose/guidelines of UK and the Netherlands). The consensus document consists of different modules, including the medical context, the theoretical background of dietary guidelines and the age-specific practical dietary guidelines. A Belgian consensus on the guidelines for the dietary management of classical galactosemia was developed despite the uncertainties of the efficacy and practical application of these guidelines. The final consensus is based on scientific knowledge and practical agreement among experts. In the future, regular revision of the guidelines is recommended and a uniform European guideline is desirable. Copyright © 2014 European Society for Clinical Nutrition and Metabolism. Published by Elsevier Ltd. All rights reserved.

  5. Strategically oriented management and controlling of resource intensive projects

    International Nuclear Information System (INIS)

    Kemmeter, Sascha

    2015-01-01

    The book on strategically oriented management and controlling of resource intensive projects covers the following issues: frame of project management and project controlling, classification of the decommissioning of nuclear facilities as resource intensive projects, research design for case studies, results of the study of project management specific characteristics of decommissioning, reference model for the project management of nuclear facility decommissioning.

  6. 45 CFR 1180.70 - Guidelines and standards for museum conservation projects.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Guidelines and standards for museum conservation projects. 1180.70 Section 1180.70 Public Welfare Regulations Relating to Public Welfare (Continued..., as applied to art, history, natural history, science and technology, and living collections: (1...

  7. Agile Project Management for e-Learning Developments

    Science.gov (United States)

    Doherty, Iain

    2010-01-01

    We outline the project management tactics that we developed in praxis in order to manage elearning projects and show how our tactics were enhanced through implementing project management techniques from a formal project management methodology. Two key factors have contributed to our project management success. The first is maintaining a clear…

  8. Project safety studies - nuclear waste management (PSE)

    International Nuclear Information System (INIS)

    1981-10-01

    The project 'Safety Studies-Nuclear Waste Management' (PSE) is a research project performed by order of the Federal Minister for Research and Technology, the general purpose of which is to deepen and ensure the understanding of the safety aspects of the nuclear waste management and to prepare a risk analysis which will have to be established in the future. Owing to this the project is part of a series of projects which serve the further development of the concept of nuclear waste management and its safety, and which are set up in such a way as to accompany the realization of that concept. This report contains the results of the first stage of the project from 1978 to mid-1981. (orig./RW) [de

  9. Autonomous Aircraft Operations using RTCA Guidelines for Airborne Conflict Management

    Science.gov (United States)

    Krishnamurthy, Karthik; Wing, David J.; Barmore, Bryan E.; Barhydt, Richard; Palmer, Michael T.; Johnson, Edward J.; Ballin, Mark G.; Eischeid, Todd M.

    2003-01-01

    A human-in-the-loop experiment was performed at the NASA Langley Research Center to study the feasibility of DAG-TM autonomous aircraft operations in highly constrained airspace. The airspace was constrained by a pair of special-use airspace (SUA) regions on either side of the pilot's planned route. Traffic flow management (TFM) constraints were imposed as a required time of arrival and crossing altitude at an en route fix. Key guidelines from the RTCA Airborne Conflict Management (ACM) concept were applied to autonomous aircraft operations for this experiment. These concepts included the RTCA ACM definitions of distinct conflict detection and collision avoidance zones, and the use of a graded system of conflict alerts for the flight crew. Three studies were conducted in the course of the experiment. The first study investigated the effect of hazard proximity upon pilot ability to meet constraints and solve conflict situations. The second study investigated pilot use of the airborne tools when faced with an unexpected loss of separation (LOS). The third study explored pilot interactions in an over-constrained conflict situation, with and without priority rules dictating who should move first. Detailed results from these studies were presented at the 5th USA/Europe Air Traffic Management R&D Seminar (ATM2003). This overview paper focuses on the integration of the RTCA ACM concept into autonomous aircraft operations in highly constrained situations, and provides an overview of the results presented at the ATM2003 seminar. These results, together with previously reported studies, continue to support the feasibility of autonomous aircraft operations.

  10. Risk management integration into complex project organizations

    Science.gov (United States)

    Fisher, K.; Greanias, G.; Rose, J.; Dumas, R.

    2002-01-01

    This paper describes the approach used in designing and adapting the SIRTF prototype, discusses some of the lessons learned in developing the SIRTF prototype, and explains the adaptability of the risk management database to varying levels project complexity.

  11. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Log in or Register to get access to full text downloads. ... (decision-making, problem-solving, listening, verbal competency, motivation, persuasion, ... Keywords: Communication skills and leadership model, construction project management, ...

  12. Guidelines on the management of atrial fibrillation in the emergency department: a critical appraisal.

    Science.gov (United States)

    Costantino, Giorgio; Podda, Gian Marco; Falsetti, Lorenzo; Iannone, Primiano; Lages, Ana; Marra, Alberto M; Masala, Maristella; Reiakvam, Olaug Marie; Savva, Florentia; Schovanek, Jan; van Bree, Sjoerd; da Silva Chora, Inês João; Privitera, Graziella; Ragozzino, Silvio; von Rotz, Matthias; Woittiez, Lycke; Davidson, Christopher; Montano, Nicola

    2017-08-01

    Several guidelines often exist on the same topic, sometimes offering divergent recommendations. For the clinician, it can be difficult to understand the reasons for this divergence and how to select the right recommendations. The aim of this study is to compare different guidelines on the management of atrial fibrillation (AF), and provide practical and affordable advice on its management in the acute setting. A PubMed search was performed in May 2014 to identify the three most recent and cited published guidelines on AF. During the 1-week school of the European School of Internal Medicine, the attending residents were divided in five working groups. The three selected guidelines were compared with five specific questions. The guidelines identified were: the European Society of Cardiology guidelines on AF, the Canadian guidelines on emergency department management of AF, and the American Heart Association guidelines on AF. Twenty-one relevant sub-questions were identified. For five of these, there was no agreement between guidelines; for three, there was partial agreement; for three data were not available (issue not covered by one of the guidelines), while for ten, there was complete agreement. Evidence on the management of AF in the acute setting is largely based on expert opinion rather than clinical trials. While there is broad agreement on the management of the haemodynamically unstable patient and the use of drugs for rate-control strategy, there is less agreement on drug therapy for rhythm control and no agreement on several other topics.

  13. Project Management and Total Quality Management : Complementary or confused?

    Directory of Open Access Journals (Sweden)

    Selma KATLANE BEN MLOUKA

    2009-01-01

    Full Text Available Quality management and project management appear as themes of strategic management today. The adoption of the project management constitutes a new way in organizing the production. It helps to cope with the complexity of the environment, to reduce the product life cycles and to make working arrangements more flexible. It should also adapt to the ICT revolution and restructuring of enterprises due to the dematerialisation of structures and transactions. Quality management, applied to more operations and strongly influenced by the quantitative approach seems compatible with project management. Indeed, the two paradigms emphasize the importance of customer satisfaction, teamwork, the role of leadership and the continuous improvement of processes and products. This paper aims to revisit the principles of relationship between total quality management and project management. Having shown the importance of incorporating fine patterns and project quality in business organization, we will explain how the ability to generate, select and conduct projects in an oriented accountability of management is able to enroll in a total quality.

  14. Managing Projects with CSR in mind

    DEFF Research Database (Denmark)

    Kampf, Constance; Thomsen, Christa

    2008-01-01

    This paper examines project management as a place where CSR can be operationalized, focusing particularly on project conception processes and co-constructing CSR knowledge with emergent tertiary stakeholders. Two projects which dealt with emergent tertiary stakeholders differently are examined.......  First, the Finnish company Metsa-Botnia's paper pulp plant in Uruguay is examined as a project in which a tertiary stakeholder, Argentina, emerged during the early stages of the project.  Argentina requested dialogue about the project conception and Metsa Botnia did not include them.  In contrast......, the Danish emergency services company Falck A/S's project on redefining CSR is offered as an example of a project transformed through dialogue with the emergent tertiary stakeholder, the county of Aarhus.   To analyze the cases, the paper combines Morsing & Schultz's (2006) dialectic CSR strategy based...

  15. Information Technology in Engineering and Project Management

    Directory of Open Access Journals (Sweden)

    Chien-Ho Ko

    2017-01-01

    Full Text Available Information Technology (IT can be regarded as the use of computers to store, analyze, and manipulate data (Daintith, 2009. With the rapid development of personal computers, IT has been widely applied in nearly every field (Davenport, 2013. This issue presents five papers covering engineering and project management, three of which focus on the application of IT to solve engineering and project management issues, while one presents research into public private partnerships, and another into cash flow forecasting.

  16. Cultural differences in Research project management

    Science.gov (United States)

    Barbier, Michele

    2016-04-01

    Scientific Projects today have increased in complexity, requiring multidisciplinarity, and requiring a mix of diverse individuals from different countries who must be integrated into an effective project. Effective team building is one of the prime responsibilities of the project manager. When the project is supported by a funding, the integration and the implication of the different partners are quite easy. Particularly when partners are developing high-performing teams. However, management of research project requires further skills when the budget is not very high and/or when partners are from non-European countries and are not using the same vocabulary. The various cultures, values, beliefs and social usages, particularly with Mediterranean countries cause a special style of communication for an individual or group of individuals. This communication style participates in the success of the project and encompasses a lot of diplomatic skills which will be highlighted.

  17. Project Management Plan for Material Stabilization

    International Nuclear Information System (INIS)

    SPEER, D.R.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617/Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides

  18. Estimation of efficiency project management

    Directory of Open Access Journals (Sweden)

    Novotorov Vladimir Yurevich

    2011-03-01

    Full Text Available In modern conditions, the effectiveness of the enterprises all in a greater degree depends on methods of management and business dealing forms. The organizations should choose the most effective for themselves strategy of management taking into account the existing legislation, concrete conditions of activity, financial and economic, investment potential and development strategy. Introduction of common system of planning and realization of strategy of the organization, it will allow to provide even development and long-term social and economic growth of the companies.

  19. Augmenting SCA project management and automation framework

    Science.gov (United States)

    Iyapparaja, M.; Sharma, Bhanupriya

    2017-11-01

    In our daily life we need to keep the records of the things in order to manage it in more efficient and proper way. Our Company manufactures semiconductor chips and sale it to the buyer. Sometimes it manufactures the entire product and sometimes partially and sometimes it sales the intermediary product obtained during manufacturing, so for the better management of the entire process there is a need to keep the track record of all the entity involved in it. Materials and Methods: Therefore to overcome with the problem the need raised to develop the framework for the maintenance of the project and for the automation testing. Project management framework provides an architecture which supports in managing the project by marinating the records of entire requirements, the test cases that were created for testing each unit of the software, defect raised from the past years. So through this the quality of the project can be maintained. Results: Automation framework provides the architecture which supports the development and implementation of the automation test script for the software testing process. Conclusion: For implementing project management framework the product of HP that is Application Lifecycle management is used which provides central repository to maintain the project.

  20. Which Type of Project Manager are You?

    DEFF Research Database (Denmark)

    2017-01-01

    Which type of project manager best describes you — are you a prophet, gambler, expert or executor? Take this twelve-question quiz to find out right now. There are no wrong answers, but the result may surprise you — and understanding your personal strength can help guide your career and project...

  1. Electronic Resources Management Project Presentation 2012

    KAUST Repository

    Ramli, Rindra M.

    2012-11-05

    This presentation describes the electronic resources management project undertaken by the KAUST library. The objectives of this project is to migrate information from MS Sharepoint to Millennium ERM module. One of the advantages of this migration is to consolidate all electronic resources into a single and centralized location. This would allow for better information sharing among library staff.

  2. Waste management project technical baseline description

    International Nuclear Information System (INIS)

    Sederburg, J.P.

    1997-01-01

    A systems engineering approach has been taken to describe the technical baseline under which the Waste Management Project is currently operating. The document contains a mission analysis, function analysis, requirement analysis, interface definitions, alternative analysis, system definition, documentation requirements, implementation definitions, and discussion of uncertainties facing the Project

  3. Graduate Student Project: Employer Operations Management Analysis

    Science.gov (United States)

    Fish, Lynn A.

    2008-01-01

    Part-time graduate students at an Association to Advance Collegiate Schools of Business-accredited college complete a unique project by applying operations management concepts to their current employer. More than 92% of 368 graduates indicated that this experiential project was a positive learning experience, and results show a positive impact on…

  4. The impact of sustainability on project management

    NARCIS (Netherlands)

    Adri Köhler; Gilbert Gilbert Silvius; Jasper van den Brink

    2011-01-01

    Chapter 11 in The Project as a Social System: Asia-Pacific Perspectives on Project Management. Sustainability is one of the most important challenges of our time. How can we develop prosperity without compromising the life of future generations? Companies are integrating ideas of sustainability in

  5. The impact of sustainability on project management

    NARCIS (Netherlands)

    Adri Köhler; Jasper van den Brink; Gilbert Gilbert Silvius

    2012-01-01

    Full text via link Chapter 11 in The Project as a Social System: Asia-Pacific Perspectives on Project Management Sustainability is one of the most important challenges of our time. How can we develop prosperity without compromising the life of future generations? Companies are integrating ideas of

  6. Decommissioning project management unit started its activities

    International Nuclear Information System (INIS)

    Medeliene, D.

    2002-01-01

    The Decommissioning Project Management Unit team comprises western experts as well as experts from INPP Decommissioning Service who all work as a single team. The DPMU will develop the Final Decommissioning Plan and a more detailed Decommissioning Project, which will describe how the plant will be removed from service and safely decommissioned

  7. The role of self-treatment guidelines in self-management education for adult asthmatics

    NARCIS (Netherlands)

    van der Palen, Jacobus Adrianus Maria; Klein, J.J.; Zielhuis, G.A.; van Herwaarden, C.L.A.

    1998-01-01

    Guidelines on asthma management have changed considerably in the last two decades. Patient education has gained in popularity and especially asthma self-management training is thought to be essential in the treatment of adult asthma. Since 1989 many researchers have added self-treatment guidelines

  8. General guidelines for the Assessment of Internal Dose from Monitoring Data (Project IDEAS)

    International Nuclear Information System (INIS)

    Doerfel, H.; Andrasi, A.; Bailey, M.; Blanchardon, E.; Berkovski, V.; Castellani, C. M.; Hurtgen, C.; Jourdain, J. R.; LeGuen, B.; Puncher, M.

    2004-01-01

    In recent major international intercomparison exercises on intake and internal dose assessments from monitoring data the results calculated by different participants varied significantly. This was mainly due to the broad variety of methods and assumptions applied in the assessment procedure. Based on these experiences the need for harmonisation of the procedures has been formulated within an EU research project under the 5th Framework Programme. The aim of the project, IDEAS, is to develop general guidelines for standardising assessments of intakes and internal doses. The IDEAS project started in October 2001 and will end in March 2005. Eight institutions from seven European countries are participating. Inputs from internal dosimetry professionals from across Europe are also being used to ensure a broad consensus in the outcome of the project. The IDEAS project is closely related to some goals of the work of Committee 2 of the ICRP and since 2003 there has been close cooperation between the two groups. To ensure that the guidelines are applicable to a wide range of practical situations, the first step has been to compile a database of well-documented cases of internal contamination. In parallel, an improved version of an existing software package has been developed and distributed to the partners for further use. A large number of cases from the database have been evaluated independently by partners in the project using the same software and the results have been reviewed. Based on these evaluations guidelines are being drafted and will be discussed with dosimetry professionals from around the world by means of a virtual workshop on the Internet early in 2004. The guidelines will be revised and refined on the basis of the experiences and discussions of this virtual workshop and the outcome of an intercomparison exercise organised as part of the project. This will be open to all internal dosimetry professionals. (Author) 10 refs

  9. [Graphic synopsis of implementation of German guideline clearing reports in national disease management guidelines].

    Science.gov (United States)

    Thole, Henning

    2011-01-01

    While methods for the production of guidelines (evidence analysis, assessment, adaptation) have been continually refined throughout the past years, there is a lack of instruments for the production of easily understandable synopses. Definition of a methodological approach to encompass synopses by Spidernet diagrams. Tables of synopses can be generated with distinct information to bring down the main results in one Spidernet diagram. This is possible for both the entire synopsis and parts of it. Guideline comparisons require detailed analyses on the one hand and easily understandable presentations of their results on the other. Guideline synopses can be substantially supported by graphic presentation of the results of synopsis. Graphic synopsis is also helpful in other cases; it may be used, for example, to summarise HTA reports, systematic reviews or guidelines. Copyright © 2011. Published by Elsevier GmbH.

  10. Management of delayed nuclear power plant projects

    International Nuclear Information System (INIS)

    2005-01-01

    The IAEA assists the management of organizations responsible for Nuclear Power Plant Projects with significant delays with respect to the originally scheduled commercial operation. Several Member States have Nuclear Power Plant Projects with delays of five or more years with respect to the originally scheduled commercial operation. The degree of conformance with original construction schedules shows large variations due to several issues, including financial, economic and public opinion factors. Solving the special difficulties related with a delayed NPP project is problematic and dependent on the particular country situation. However it is not regarded as an isolated national problem but as a significant issue with a number of difficulties shared by several Member States. The IAEA collects information and supports the management of delayed NPP projects by identifying main common issues, gathering available experience and addressing specific needs. On this background the IAEA is in the position to provide unique impartial assistance based upon best international practices. This enables Member States to maintain readiness for resuming the project construction when the conditions permit and to strengthen management's abilities for the completion of the project. The IAEA's service is tailored to the needs and requirements of the requesting organization, implemented on-site by international experts and addresses areas such as project control measures, human resources, updating to technological and regulatory requirements, project data, nuclear safety review, physical protection and nuclear security and preparation to resume project construction and operation

  11. Project management and performance management: potential transdisciplinary contributions

    Directory of Open Access Journals (Sweden)

    Gerrit van der Waldt

    2012-12-01

    Full Text Available As project management and performance management as management applications gain momentum in public sector settings, the question often arise as to if, how, and when these applications should complement each other in various policy implementation and service delivery initiatives. Answers to this question should be sought from various vantage points or perspectives. These vantage points may range from macro, meso, micro as well as theoretical-methodological perspectives. The purpose of this paper is to unlock the potential for transdisciplinary contributions between Project Management and Performance Management by focusing on the methodologies, functional areas, and practical applications of both management disciplines. It is argued that the respective methodologies and their processes should be unpacked to identify the timing or moment when each discipline could, and should, make a contribution to the success of the other. This will add value to the theoretical underpinnings and practical applications of both study domains in the public sector. The respective contributions are illustrated by means of application realities of both management practices in the South African Public Service. Keywords: project management, performance management, Public Sector applications, transdisciplinarity Disciplines: project management, performance management

  12. The Human Element of Project Management

    Science.gov (United States)

    Gillard, Sharlett

    2017-01-01

    Much research and dialogue have been published about project management. Studies have been conducted regarding the impact of size, member location, gender composition, cross-functional structure, stakeholder influence, confidence issues, technology usage, management style, generational differences, technical expertise vs. people skills, and a…

  13. Project-based organizing and strategic management

    DEFF Research Database (Denmark)

    very different industries such as management consulting, engineering or entertainment. Contributors analyze PBOs as firms, units or networks of firms set up to complete a specific assignment, as well as address the evolution from traditional operations-driven project management, to the strategic role...

  14. Spent Nuclear Fuel Project Document Management Plan

    International Nuclear Information System (INIS)

    Connor, M.D.; Harizison, G.L.; Rice, W.C.

    1995-12-01

    The SNF Project Document Management Plan identifies and describes the currently available systems and processes for implementing and maintaining an effective document control and records management program. This program governs the methods by which documents are generated, released, distributed, maintained current, retired, and ultimately disposed

  15. COORDINATES OF A RISK MANAGEMENT PROJECT

    OpenAIRE

    ALEXANDRU OLTEANU; MĂDĂLINA ANTOANETA RĂDOI

    2013-01-01

    High risk – high benefit: a well-known correlation both in the economic field and in the day-to-day life. Another correlation, on which this article is based: large project – numerous participants – increased risks and other malfunctions. The risk management concept is challenged by those projects and is forced to find the most adequate “customized” ways for each project at its turn. In this respect, the assessment of management has followed the trend of the last three decades, marked by movi...

  16. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  17. When Serious Project Management is a Critical Business Requirement

    Science.gov (United States)

    Jansma, P. A.; Gibby, L.; Chambers, C.; Joines, J.; Egger, R.

    2000-01-01

    When serious project management is a critical business requirement, project managers need to integrate cost, schedule and technical scope of work across the project, and apply earned value management (EVM).

  18. Guidelines of the Design of Electropyrotechnic Firing Circuit for Unmanned Flight and Ground Test Projects

    Science.gov (United States)

    Gonzalez, Guillermo A.; Lucy, Melvin H.; Massie, Jeffrey J.

    2013-01-01

    The NASA Langley Research Center, Engineering Directorate, Electronic System Branch, is responsible for providing pyrotechnic support capabilities to Langley Research Center unmanned flight and ground test projects. These capabilities include device selection, procurement, testing, problem solving, firing system design, fabrication and testing; ground support equipment design, fabrication and testing; checkout procedures and procedure?s training to pyro technicians. This technical memorandum will serve as a guideline for the design, fabrication and testing of electropyrotechnic firing systems. The guidelines will discuss the entire process beginning with requirements definition and ending with development and execution.

  19. Patient participation in ERS guidelines and research projects: the EMBARC experience.

    Science.gov (United States)

    Chalmers, James D; Timothy, Alan; Polverino, Eva; Almagro, Marta; Ruddy, Thomas; Powell, Pippa; Boyd, Jeanette

    2017-09-01

    The European Multicentre Bronchiectasis Audit and Research Collaboration (EMBARC) is a European Respiratory Society (ERS) Clinical Research Collaboration dedicated to improving research and clinical care for people with bronchiectasis. EMBARC has created a European Bronchiectasis Registry, funded by the ERS and by the European Union (EU) Innovative Medicines Initiative Programme. From the outset, EMBARC had the ambition to be a patient-focussed project. In contrast to many respiratory diseases, however, there are no specific patient charities or European patient organisations for patients with bronchiectasis and no existing infrastructure for patient engagement. This article describes the experience of EMBARC and the European Lung Foundation in establishing a patient advisory group and then engaging this group in European guidelines, an international registry and a series of research studies. Patient involvement in research, clinical guidelines and educational activities is increasingly advocated and increasingly important. Genuine patient engagement can achieve a number of goals that are critical to the success of an EU project, including focussing activities on patient priorities, allowing patients to direct the clinical and research agenda, and dissemination of guidelines and research findings to patients and the general public. Here, we review lessons learned and provide guidance for future ERS task forces, EU-funded projects or clinical research collaborations that are considering patient involvement. To understand the different ways in which patients can contribute to clinical guidelines, research projects and educational activities.To understand the barriers and potential solutions to these barriers from a physician's perspective, in order to ensure meaningful patient involvement in clinical projects.To understand the barriers and potential solutions from a patient's perspective, in order to meaningfully involve patients in clinical projects.

  20. Using facilitative skills in project management

    DEFF Research Database (Denmark)

    Rasmussen, Lauge Baungaard; Hansen, Mette Sanne; Jacobsen, Peter

    2013-01-01

    Project management can be seen as a profession, discipline and conceptual framework. It has been developed from different fields, including military engineering, mechanical engineering, social sciences and construction. During recent decades, there has been a number of challenges as to its efficacy...... cooperation, mediated by interconnected and diversified systems, is becoming more and more common. These relatively new forms of interaction imply new demands on skills and methods facilitating project cooperation within and among various organizations. Given the pervasiveness of these demands, project...... managers are frequently finding themselves in situations where using facilitating skills is not an option, but a requirement. Facilitation is to be viewed as a process of ‘obstetric’ aid to meet the challenges of coping with the changing conditions for project management described briefly above...