  1. Managing Challenges in a Multi Contractor Project

    Science.gov (United States)

    King, Ron

    2011-01-01

    The presentation provides a project description, describes the integrated product team, and review project challenges. The challenges include programmatic, technical, basic drop tests, heavy drop tests, C-17 envelope expansion, and Ares I-X.

  2. Design management of general contractor under nuclear power project EPC mode

    International Nuclear Information System (INIS)

    Su Shaojian

    2013-01-01

    Design management has not yet formed a theoretical system recognized, general contractor design managers under nuclear power project EPC Mode lack the clear theory basis. This paper aims to discuss Design management from the angle of general contractor under nuclear power project EPC mode, Gives the concept of design management Clearly, by Combining the characteristics of nuclear power project, Gives the specific content and meaning of the design management of nuclear power project. (authors)

  3. Requirements for the project management in the client / engineering contractor relationship

    International Nuclear Information System (INIS)

    Hack, W.L.

    1995-01-01

    Investment projects impose a multitude of requirements upon clients and engineering contractors to cope with the management of project inherent conflicts. The paper reviews certain aspects on why such conflicts develop, and how they may be resolved. (orig.)

  4. Contractor management

    NARCIS (Netherlands)

    Ustailieva, E.; Starren, A.

    2013-01-01

    Companies function more and more in networks (i.e. contractor chains with contractors, suppliers and/or other companies. This asks for several companies/parties to work together to get the work done. Working in contractor chains is very common in sectors like maintenance, construction, cleaning, and

  5. Bulk material management mode of general contractors in nuclear power project

    International Nuclear Information System (INIS)

    Zhang Jinyong; Zhao Xiaobo

    2011-01-01

    The paper introduces the characteristics of bulk material management mode in construction project, and the advantages and disadvantages of bulk material management mode of general contractors in nuclear power project. In combination with the bulk material management mode of China Nuclear Power Engineering Co., Ltd, some improvement measures have been put forward as well. (authors)

  6. The weaknesses of China's contractors in overseas construction project management: 2 case studies

    Directory of Open Access Journals (Sweden)

    Ph. D. Mo Xuan

    2012-05-01

    Full Text Available The practices of international construction contracting have been prevalent increasingly over the past half a centuru, Altough the contractors of highly developed world have dominated this field, there tends to be more players from newly emerging countries like China. The history of China's contractors performing in the overseas construction markets is divided into 3 major phases, namely the planning economy era, reform and openness perios and the latest nwe millennium. However, the know-how and techniques of modern project management have been widely deployed in China for merely 2 decades. While competing with those veterans in overseas markets, China's contractors still lack adequate advantages as well as experiences, leading to the underperformance or even failures. A 2-dimension framework of overseas project management, comprising the external risk and internal function aspects , is proposed. Based on the analysis of 2 recent cases in Saudi Arabia an Poland respectively, it's foung that the low cost strategy management in risk, commerce, cost, human resources, etc. are their fatal weaknesses.

  7. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    Energy Technology Data Exchange (ETDEWEB)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  8. Implementation and implication of total quality management on client- contractor relationship in residential projects

    Science.gov (United States)

    Murali, Swetha; Ponmalar, V.

    2017-07-01

    To make innovation and continuous improvement as a norm, some traditional practices must become unlearnt. Change for growth and competitiveness are required for sustainability for any profitable business such as the construction industry. The leading companies are willing to implement Total Quality Management (TQM) principles, to realise potential advantages and improve growth and efficiency. Ironically, researches recollected quality as the most significant provider for competitive advantage in industrial leadership. The two objectives of this paper are 1) Identify TQM effectiveness in residential projects and 2) Identify the client satisfaction/dissatisfaction areas using Analytical Hierarchy Process (AHP) and suggest effective mitigate measures. Using statistical survey techniques like set of questionnaire survey, it is observed that total quality management was applied in some leading successful organization to an extent. The main attributes for quality achievement can be defined as teamwork and better communication with single agreed goal between client and contractor. Onsite safety is a paramount attribute in the identifying quality within the residential projects. It was noticed that the process based quality methods such as onsite safe working condition; safe management system and modern engineering process safety controls etc. as interlinked functions. Training and effective communication with all stakeholders on quality management principles is essential for effective quality work. Late Only through effective TQM principles companies can avoid some contract litigations with an increased client satisfaction Index.

  9. Management of Interface between Main Contractor and Subcontractors for Successful Project Outcomes

    Directory of Open Access Journals (Sweden)

    Harry White

    2014-01-01

    Full Text Available There has been increased dependence on subcontracting within the construction industry, the operational relationship between the Main Contractor (MC and Subcontractor (SC plays a significant role in successful delivery of projects. Through the literature review this paper argues that despite SCs bring added value to construction projects, the increased reliance on SCs has strained relationships between the MC and SC. Also MCs are more concerned with risk and price reduction which undermine the relationship heavily. Current practices in the construction industry in managing SCs were evaluated through a case study and semi-structured interviews. A questionnaire survey was used to investigate the ways of facilitating the interface between the MC and SC in general. The study highlighted that prevailing adverse relationships and culture in the industry are influencing the success of construction projects. The lack of trust is a key factor affecting the relationships between MC and SCs. However, the proactive involvement of the MC with SCs in maintaining continuity of the team from procurement to construction stage and transparency in the processes were key success factors for successful completion of the project.

  10. Risk analysis in the management of urban construction projects from the perspective of the employer and the contractor

    Directory of Open Access Journals (Sweden)

    Mohammad Taghipour

    2015-12-01

    Full Text Available Imbalance between anticipated and actual progress in the development of urban construction projects suggests that there are many obstacles and risks which not only causes the urban management be unsustainable, but the reconstruction and development of urban space is also seriously threatened. In this study, the library research on issues related to the risk of construction projects was done, then some interviews were conducted with experts and managers informed and involved in the projects, and finally questionnaires were distributed to identify and classify the impact of the risks of the implementation of the construction projects. After analyzing the data, the results indicated that the experts listed the most significant risks as the delays in the payment of contractors' claims and statements due to the lack of handling financial instruments, the governance of relationships rather than rules in the tenders resulting from employer actions, low commitment to the quality of work provided by their subcontractors, failure to complete the detail engineering by foreign contractors on time, weaknesses in contractors' financial resources, and offering lower prices than reasonable by contractors to win the tender. All of these require special attention and other kinds of risks are important at the next level. Finally, the solutions for eliminating or reducing risks in high-risk areas have been offered to provide tranquility for contractors and employers.

  11. THE EVALUATION OF THE IMPLEMENTATION OF CONTRACTOR SAFETY MANAGEMENT SYSTEM (CSMS PROGRAM ON TURNAROUND PROJECT (TA AT PT. PUPUK SRIWIDJAJA (PUSRI PALEMBANG

    Directory of Open Access Journals (Sweden)

    Muhammad Arif

    2016-03-01

    Full Text Available Background :Turnaround is one of the done by contractor in which if it is not managed well, it could cause work accident. The purpose of this study was to evaluate the implementation of contractor safety management system (CSMS program on turnaround project at PT. Pupuk Sriwidjaja Palembang. Method : This study was a qualitative study. The information was obtained from deep interview, observation and the study of document. The data was analyzed by using content analysis. The validity of the instruments was tested through triangulation of sources, method and data Result : The program implementation Contractor Safety Management System (CSMS on a turnaround project is already well underway only on projects in addition to departments turnaround K3 & LH less involved in the risk assessment stage, pre-qualification and selection of contractors. Conclusion : The implementation of the program Contractor Safety Management System (CSMS on a turnaround project at PT. Pupuk Sriwidjaja Palembang are in accordance with the Code of Labor Management Health, Safety and Environmental Protection Contractor BPMIGAS. It is advisable to PT. Pupuk Sriwidjaja Palembang in order to improve communication between departments procure goods and services with K3 and LH-related departments work tendered as the risk assessment stage, pre-qualification and selection on work tendered. Need sanctions against contractors who do not regularly report performance data K3.

  12. Construction Manager or General Contractor?

    Science.gov (United States)

    McKinley, John

    1991-01-01

    Unlike the general contractor approach, the construction management firm acts on behalf of the school district in school construction. Examines the development and nature of construction management, and cites its advantages and disadvantages. (MLF)

  13. Technical assistance contractor Management Plan

    International Nuclear Information System (INIS)

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins ampersand Beckwith Agra, Inc. (SHB Agra), and Geraghty ampersand Miller, Inc. (G ampersand M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC's groundwater technical breadth and depth, so G ampersand M was brought in to augment the team's capabilities. The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC's management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls

  14. Financial management of construction contractors.

    OpenAIRE

    Lacaria, Chris J.

    1994-01-01

    The scope of this paper is to discuss the financial management of a construction contractor. This paper attempts to approach this subject in a logical and systematic way. It communicates the importance of financial analysis and planning along with cash planning and profit planning. This report is not intended to be an all inclusive discussion of financial management in construction. Contractor's Financial Management is an extremely important subject. It has been told ...

  15. Key drivers for informal project coordination among sub-contractors

    DEFF Research Database (Denmark)

    Aagaard, Annabeth; Eskerod, Pernille; Madsen, Erik Skov

    2015-01-01

    understandings. Still though, many sub-contractors choose not to coordinate informally. The purpose of this paper is to identify drivers that enhance or inhibits informal coordination in projects. A qualitative, explorative case study approach was applied. Fifteen SME sub-contractors within the offshore wind...... are massive. Six drivers which enhance informal coordination and three drivers which inhibit informal coordination among sub-contractors in projects were identified. The findings imply that management in project-oriented organizations can enhance informal coordination across project sub-contractors...... and by facilitating trust building, by emphasizing previous collaboration successes with the sub-contractors and the possibility of future common projects, by being explicit about expectations on informal coordination, and by developing sub-contractor contracts that are not as tight in economic terms, but instead...

  16. Emerging Trends of the Owner-Contractor Relationship for Capital Facility Projects: From the Contractor Perspective

    National Research Council Canada - National Science Library

    Geertsema, Cameron

    2003-01-01

    .... Specifically, this document will focus on how the outcome of capital facility projects are affected by human resources practices, and the management principles and practices of the contractor-owner...

  17. Contractor firm strategies in delivering green project: A review

    Science.gov (United States)

    Powmya, Ayisha; Abidin, Nazirah Zainul; Azizi, Nurul Sakina Mokhtar

    2017-10-01

    Building green requires effort from various parties, from those who plan, design, manage and construct the building. Contractors are responsible for converting the design on paper into a real building and their role at the construction site support environmental sustainability by implementing responsible construction practices. Inefficient or inexperienced contractor in green construction project may find that delivering this type of project is not an easy task due to added requirement in design, stringent practices at site and the use of green technology and materials. Adopting suitable strategies at firm level will assist in preparatory process and readiness of delivering the green project. This paper reviews the strategies at firm level to deliver green construction project. From extensive literature review, it was discovered that there are six strategies to be adopted by the contractor. Understanding these strategies is expected to promote more contractors to be proactive in delivering green projects.

  18. Technical Assistance Contractor management plan. Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project

  19. Technical Assistance Contractor management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  20. Technical assistance contractor Management Plan. Final [report

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins & Beckwith Agra, Inc. (SHB Agra), and Geraghty & Miller, Inc. (G&M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC`s groundwater technical breadth and depth, so G&M was brought in to augment the team`s capabilities. The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC`s management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls.

  1. Configuration Management Plan for the Tank Farm Contractor

    Energy Technology Data Exchange (ETDEWEB)

    WEIR, W.R.

    2000-04-21

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.

  2. Configuration Management Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    WEIR, W.R.

    2000-01-01

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments

  3. Strategic management competencies in Scandinavian contractors

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2013-01-01

    Over the past ten years, a series of contractors operating in Denmark, Norway and Sweden have slowly but surely expanded their markets beyond their previous single-country base towards operating in Scandinavia as a whole, and beyond. This expansion has been accompanied by a restructuring of company...... management and HR concepts and approaches. Methodologically, a sample of the top level leaders of the hundred largest business units at some thirty Scandinavian contractors has been analysed. The focus is on the 400 top level managers in these organisations. On the basis of a desk study, an analysis of 124...

  4. The responsibility of the contractor for project deficiencies

    Directory of Open Access Journals (Sweden)

    Pušac Jovana

    2011-01-01

    Full Text Available In this paper the author analyzes a civil law responsibility of the Contractor for project deficiencies resulting in reduced quality of the construction, i.e. not affecting its solidity. Primary obligation of the Contractor is to perform works in compliance with professional standards, the contract and the approved project. The Contractor cannot change the approved project at will, even when he has designed it. Hence, the question must be raised of the obligation of the Contractor to strictly abide by the project, assigned to him by the Authority, regardless of evident deficiencies of the Project and of his responsibility for performing works in compliance with the said project resulting in deficiencies in the construction, that is construction works. If the latter hypothesis is correct, then it must be established what deficiencies in the project fall under the responsibility of the Contractor (visible or hidden, i.e. the issue of dividing responsibility between the Project Designer and the Contractor in terms of the project deficiencies must be set up and solved. Finally, it is also important to define the realization of rights and duties of the Contractor in case the Contractor has to recede from the Project. In this paper the author tries to offer detail and complete answers to raised questions.

  5. 77 FR 13153 - Information Collection; NASA Contractor Financial Management Reports

    Science.gov (United States)

    2012-03-05

    ..., [email protected] . SUPPLEMENTARY INFORMATION: I. Abstract The NASA Contractor Financial Management... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [Notice 12-019] Information Collection; NASA Contractor Financial Management Reports AGENCY: National Aeronautics and Space Administration (NASA). ACTION...

  6. 77 FR 12754 - Contractor Legal Management Requirements; Acquisition Regulations

    Science.gov (United States)

    2012-03-02

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 Parts 931, 952 and 970 RIN 1990-AA37 Contractor Legal... rulemaking (NOPR) to revise existing regulations covering contractor legal management requirements and make... relating to the DOE notice of proposed rulemaking to revise existing regulations covering contractor legal...

  7. 76 FR 13423 - Notice of Submission of Proposed Information Collection to OMB; Contractor's Requisition-Project...

    Science.gov (United States)

    2011-03-11

    ... Proposed Information Collection to OMB; Contractor's Requisition--Project Mortgages AGENCY: Office of the.... Contractor's monthly application for distribution of insured mortgage proceeds for construction costs... Following Information Title of Proposal: Contractor's Requisition--Project Mortgages. OMB Approval Number...

  8. Project Culture in the Chinese Construction Industry: Perceptions of Contractors

    Directory of Open Access Journals (Sweden)

    Jian Zou

    2012-11-01

    Full Text Available In recent years culture has become one of the most studied topicsin project management research. Some studies have investigatedthe infl uence of culture at different levels – such as nationalculture, industry culture, organisational culture and professionalculture. As a project-based industry, the construction industryneeds to have more insight concerning cultural issues at theproject level and their infl uence on the performance of constructionprojects. Few studies, however, have focused on culture at theproject level. This paper uses a questionnaire survey to determinethe perceptions of Chinese contractors about the impact of projectculture on the performance of local construction projects. This isaugmented by a series of in-depth interviews with senior executivemanagers in the industry. The fi ndings indicate that specifi c projectculture does contribute signifi cantly towards project outcomes.In particular, goal orientation and fl exibility, as two dimensionsof project culture, have a negative statistical correlation withperceived satisfaction of the process, commercial success, futurebusiness opportunities, lessons learnt from the project, satisfactionwith the relationships, and overall performance. This paper alsoindicates that the affordability of developing an appropriate projectculture is a major concern for industry practitioners.

  9. Contractors' Perception of factors Contributing to Project Delay: Case Studies of Commercial Projects in Klang Valley, Malaysia

    Directory of Open Access Journals (Sweden)

    Azlan Shah Ali

    2010-12-01

    Full Text Available Delay in construction projects is a situation where the project cannot be completed under the planned time. It is a common issue faced in the construction industry all over the world especially in developing countries. In the Malaysian construction industry, 17.3% of construction projects experience more than 3 months delay and some of them are abandoned. Hence, the study of factors contributing to delay is very important in order to reduce the number of projects that experience delay in project delivery. Three objectives of the research have been formulated, namely (1 to identify factors that contribute to delay in construction projects; (2 to analyse and rank the causes of delay rated by contractors; and (3 to study the effects of delay in construction projects. One hundred questionnaires were distributed during data collection stage and only 36 responses received. The respondents only consist of contractors and sub-contractors because the scope of the research focuses on contractors' perception. The data collected was analysed using SPSS software. Seven factors that contribute to delay were identified through literature review, namely contractors' financial difficulties, construction mistakes and defective work, labour shortage, coordination problems, shortage of tools and equipment, material shortage and poor site management. Of those factors, the three most important factors were found to be labour shortage, contractors' financial difficulties and construction mistakes and defective works. Besides project delay, the research shows that cost overrun and extension of time (EOT are the most common effects of delay in construction projects.

  10. Technical assistance contractor management plan: Surface and ground water

    International Nuclear Information System (INIS)

    1994-09-01

    This report presents the general management structure of the Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. This team is a partnership of four major private subcontractors, which teamed together, are striving to be the leader in environmental restoration of uranium mining and milling operations. It will provide a pool of experts in various aspects of the technologies necessary to accomplish this goal, available to DOE to deal with mission concerns. The report expands on goals from TAC's mission statement, which include management concerns, environment, safety, and health, quality, technical support, communications, and personnel

  11. Technical assistance contractor management plan: Surface and ground water

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This report presents the general management structure of the Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. This team is a partnership of four major private subcontractors, which teamed together, are striving to be the leader in environmental restoration of uranium mining and milling operations. It will provide a pool of experts in various aspects of the technologies necessary to accomplish this goal, available to DOE to deal with mission concerns. The report expands on goals from TAC`s mission statement, which include management concerns, environment, safety, and health, quality, technical support, communications, and personnel.

  12. Determining Success Criteria and Success Factors for International Construction Projects for Malaysian Contractors

    Directory of Open Access Journals (Sweden)

    Ali Mohammed Alashwal

    2017-06-01

    Full Text Available The success of international construction projects is fraught with various challenges such as competitiveness, lack of resources, versatile global economy, and specific conditions in the host country. Malaysian contractors have been venturing into global construction market since early 1980s. However, their venturing was not successful all the time. The number of international projects awarded to Malaysian contractors has reduced drastically during the past decade. Taking advantage of this experience, this paper aims to identify the success criteria and success factors of international construction projects. The data was collected from 120 respondents using a questionnaire survey and analysed using principal component analysis and regression analysis. The results revealed three principal criteria of project success namely, Management Success, Functional Success, and Organisation Success. The main components of success factors include Team Power and Skills, Resource Availability, External Environment, Organisation Capability, Project Support, and Project Organisation. Further analysis emphasized the importance of strong financing capacity of contractors, project social environment, and competence of the project manager in achieving project success. The results of this paper can serve as a guideline for contractors and project managers to achieve success in this context. Future studies may provide in-depth analysis of success criteria and success factors specific for construction project type and host-country location.

  13. 78 FR 29247 - Contractor Legal Management Requirements; Acquisition Regulations; Correction

    Science.gov (United States)

    2013-05-20

    ... DEPARTMENT OF ENERGY 48 CFR Part 952 RIN 1990-AA37 Contractor Legal Management Requirements; Acquisition Regulations; Correction AGENCY: Department of Energy. ACTION: Final rule; correction. SUMMARY: The... (78 FR 25795). In this document, DOE revised existing regulations covering contractor legal management...

  14. Project Finance Model for Small Contractors in USA

    Directory of Open Access Journals (Sweden)

    Jawahar Nesan

    2012-11-01

    Full Text Available Construction projects do not require a large capital outlay but a large working capital to start up the project. Unfortunately, for small contractors there are very limited options available from the banks or other lending institutions to cover this large working capital requirement in the absence of sufficient collateral. The “Project Finance” method presented in this paper is recommended as the most effective method for small contractors in the United States. The problems of small and start up contractors in funding their projects have been little addressed in the literature. The current financing practices were observed through both the literature review and interviews with contractors and bankers in the western Michigan area and subsequently a system has been proposed which could help a small start-up company seeking higher growth. The growth rates that can be achieved using the project finance system in contrast to the traditional “line of credit” arrangements as illustrated in this paper show that the project finance model is beneficial.

  15. Project Management

    DEFF Research Database (Denmark)

    Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015.......Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015....

  16. Project Management

    DEFF Research Database (Denmark)

    Pilkington, Alan; Chai, Kah-Hin; Le, Yang

    2015-01-01

    This paper identifies the true coverage of PM theory through a bibliometric analysis of the International Journal of Project Management from 1996-2012. We identify six persistent research themes: project time management, project risk management, programme management, large-scale project management......, project success/failure and practitioner development. These differ from those presented in review and editorial articles in the literature. In addition, topics missing from the PM BOK: knowledge management project-based organization and project portfolio management have become more popular topics...

  17. Investigating the determinants of contractor's construction and demolition waste management behavior in Mainland China.

    Science.gov (United States)

    Wu, Zezhou; Yu, Ann T W; Shen, Liyin

    2017-02-01

    The abundant generation of construction and demolition (C&D) waste presents a significant challenge to the sustainable development of the construction industry in Mainland China. As the implementer of construction activities, the contractor's C&D waste management performance plays an important role in C&D waste minimization. This paper aims to investigate the determinants of the contractor's C&D waste management behavior in Mainland China. The Theory of Planned Behavior (TPB) was selected as the basis of the theoretical model. In addition, three contextual constructs (i.e., economic viability, governmental supervision, and project constraints) were introduced, formulating the initial model. Based on the initial model, eight constructs were identified and seven hypotheses were proposed. A questionnaire survey was conducted to collect data and a Structural Equation Modeling (SEM) analysis was employed to test the proposed hypotheses. Results showed that the C&D waste management intention is not a significant determinant of contractor's C&D waste management behavior. The most important determinant is economic viability, followed by governmental supervision as the second most important determinant. Nevertheless, the construct of project constraints is an insignificant determinant for contractor's adoption of C&D waste management behavior. The research findings imply that, in Mainland China, the government, at this stage, plays an important role in guiding and promoting the contractor to exhibit better C&D waste management behavior. Copyright © 2016 Elsevier Ltd. All rights reserved.

  18. 48 CFR 1852.242-73 - NASA contractor financial management reporting.

    Science.gov (United States)

    2010-10-01

    ... Provisions and Clauses 1852.242-73 NASA contractor financial management reporting. As prescribed in 1842.7202, insert the following clause: NASA Contractor Financial Management Reporting (NOV 2004) (a) The Contractor... instructions in NASA Procedures and Guidelines (NPR) 9501.2, NASA Contractor Financial Management Reporting...

  19. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP). The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. The QAIP is authorized and approved by the TAC Project Manager and QA manager. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization activities are carried out in a manner that will protect public health and safety, promote the success of the UMTRA Project and meet or exceed contract requirements

  20. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water, Revision 2

    International Nuclear Information System (INIS)

    1995-11-01

    This document contains the Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The QAIP outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QA program is designed to use monitoring, audit, and surveillance activities as management tools to ensure that UMTRA Project activities are carried out in amanner to protect public health and safety, promote the success of the UMTRA Project, and meet or exceed contract requirements

  1. UMTRA project technical assistance contractor quality assurance implementation plan

    International Nuclear Information System (INIS)

    1994-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center

  2. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    International Nuclear Information System (INIS)

    Honeyman, J.O.

    1998-01-01

    This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined

  3. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  4. Factors and values of willingness to pay for improved construction waste management--a perspective of Malaysian contractors.

    Science.gov (United States)

    Begum, Rawshan Ara; Siwar, Chamhuri; Pereira, Joy Jacqueline; Jaafar, Abdul Hamid

    2007-01-01

    Malaysia is facing an increase in the generation of waste and of accompanying problems with the disposal of this waste. In the last two decades, extensive building and infrastructure development projects have led to an increase in the generation of construction waste material. The construction industry has a substantial impact on the environment, and its environmental effects are in direct relation to the quality and quantity of the waste it generates. This paper discusses general characteristics of the construction contractors, the contractors' willingness to pay (WTP) for improved construction waste management, determining factors which affect the amount of their willingness to pay, and suggestions and policy implications in the perspective of construction waste management in Malaysia. The data in this study is based on contractors registered with the construction industry development board (CIDB) of Malaysia. Employing the open ended contingent valuation method, the study assessed the contractors' average maximum WTP for improved construction waste management to be RM69.88 (1US$=3.6 RM) per tonne of waste. The result shows that the average maximum WTP is higher for large contractors than for medium and small contractors. The highest average maximum WTP value is RM88.00 for Group A (large contractors) RM78.25 for Group B (medium-size contractors) and RM55.80 for Group C (small contractors). One of the contributions of this study is to highlight the difference of CIDB registration grade in the WTP for improved construction waste management. It is found that contractors' WTP for improved waste collection and disposal services increases with the increase in contractors' current paid up capital. The identified factors and determinants of the WTP will assist the formulation of appropriate policies in addressing the construction waste problem in Malaysia and indirectly improve the quality of construction in the country.

  5. 78 FR 64143 - 30-Day Notice of Proposed Information Collection: Contractor's Requisition-Project Mortgages

    Science.gov (United States)

    2013-10-25

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5683-N-88] 30-Day Notice of Proposed Information Collection: Contractor's Requisition--Project Mortgages AGENCY: Office of the Chief Information... Title of Information Collection: Contractor's Requisition--Project Mortgages. OMB Approval Number: 2502...

  6. Project Management

    DEFF Research Database (Denmark)

    Kampf, Constance

    2009-01-01

    In this video Associate Professor Constance Kampf talks about the importance project management. Not only as a tool in implementation, but also as a way of thinking, and as something that needs to be considered from idea conception......In this video Associate Professor Constance Kampf talks about the importance project management. Not only as a tool in implementation, but also as a way of thinking, and as something that needs to be considered from idea conception...

  7. A practical due diligence strategy for managing the safety of contractors

    International Nuclear Information System (INIS)

    Catton, C.

    1998-01-01

    Ontario Hydro's Fossil Business has developed and implemented a practical program to ensure that the due diligence requirements for contractors are met, particularly in the health and safety area. Companies in the power generation business are hiring contractors to protect their competitive potential by having them perform specialty work outside the core business of generating electricity. The reasons behind this trend, and the need for companies to develop comprehensive contractor safety management systems to avoid legislative liability and cost overruns, and to have contractors work safely, are examined. The main elements of Ontario Hydro's Fossil Business Contractor Safety Management Program (contractor safety policy, contractor safety manual, contractor safety training, and a contractor safety performance database) are discussed. 2 figs., 2 appendices

  8. Methods Dealing with Complexity in Selecting Joint Venture Contractors for Large-Scale Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    Ru Liang

    2018-01-01

    Full Text Available The magnitude of business dynamics has increased rapidly due to increased complexity, uncertainty, and risk of large-scale infrastructure projects. This fact made it increasingly tough to “go alone” into a contractor. As a consequence, joint venture contractors with diverse strengths and weaknesses cooperatively bid for bidding. Understanding project complexity and making decision on the optimal joint venture contractor is challenging. This paper is to study how to select joint venture contractors for undertaking large-scale infrastructure projects based on a multiattribute mathematical model. Two different methods are developed to solve the problem. One is based on ideal points and the other one is based on balanced ideal advantages. Both of the two methods consider individual difference in expert judgment and contractor attributes. A case study of Hong Kong-Zhuhai-Macao-Bridge (HZMB project in China is used to demonstrate how to apply these two methods and their advantages.

  9. Financial Planning and Management Practices of Electrical Contractors

    Directory of Open Access Journals (Sweden)

    Lucko Gunnar

    2016-12-01

    Full Text Available Contractors must carefully manage their cash outflows (e.g., for materials to enable their work and inflows (after the work to be profitable, particularly in an economy that is still recovering from the 2008-2012 recession that grew out of the mortgage crisis. Their importance for business success is undisputed, as bankruptcies due to insufficient cash flow underline. Therefore, this study investigated current business practices of electrical contracting companies of different sizes with respect to their financial planning and management. A detailed questionnaire was developed with best guidelines on survey studies and pilot testing. It was sent to members of the National Electrical Contractors Association. Respondent anonymity was ensured. The survey recorded demographics, business practices, operating conditions, and other important factors using 57 subquestions. Each section allowed feedback to clarify the numerical responses. Responses were well distributed across company sizes, so that the results are representative for the entire industry. The results indicated that contractors generally have a substantial amount of experience in financial decision making. Their approach is conservative and focuses on healthy growth. Yet, opportunities to fine-tune business practices are identified, e.g., immediate invoicing, considering discounts to accelerate payment receipts, attempting to negotiate and use favorable credit terms, reviewing payment performance, and performing frequent cash flow forecasts. Some of the differences in the responses can be attributed to different company sizes. To help especially smaller companies in planning their cash flow, a spreadsheet for implementation has been created.

  10. 78 FR 45945 - 60-Day Notice of Proposed Information Collection: Contractor's Requisition-Project Mortgages

    Science.gov (United States)

    2013-07-30

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5687-N-34] 60-Day Notice of Proposed Information Collection: Contractor's Requisition--Project Mortgages AGENCY: Office of the Assistant Secretary... Section A. A. Overview of Information Collection Title of Information Collection: Contractor's Requisition...

  11. Performance of consultants on government projects in ghana: Client and contractor pespective

    Directory of Open Access Journals (Sweden)

    J. Dadzie

    2013-07-01

    Full Text Available Construction project consultants share the characteristics of helping their clients address problems and improve upon project performance; they have a passion for the wisdom and expertise they bring to the project, and they have the ability to galvanize clients into action. However, it is an open secret that many projects often delay. Also, it is a known fact that most project contract figures swell more than double the original tender figure. Meanwhile, there are supervising consultants who are engaged and paid to manage such important projects. Their role however, is to complement the effort of contractors to ensure a successful completion of a project. The aim of this research is to identify factors affecting the performance of consultants on government projects, and to rank these factors according to their relative importance from the perspective of consultants. Analysis of the factors considered in a survey indicate that the main factors negatively affecting the performance of consultants are: urgency of the project at hand, project duration, variations, political influence from higher authority, timely decision making on the part of the consulting team and the experience of the design team on the project. The others are the ability of the consultants to work as a team, creativity on the part of the consultants in controlling cost and developing own efficiencies so that contract sums are kept within budget .

  12. Waste Management Process Improvement Project

    International Nuclear Information System (INIS)

    Atwood, J.; Borden, G.; Rangel, G. R.

    2002-01-01

    The Bechtel Hanford-led Environmental Restoration Contractor team's Waste Management Process Improvement Project is working diligently with the U.S. Department of Energy's (DOE) Richland Operations Office to improve the waste management process to meet DOE's need for an efficient, cost-effective program for the management of dangerous, low-level and mixed-low-level waste. Additionally the program must meet all applicable regulatory requirements. The need for improvement was highlighted when a change in the Groundwater/Vadose Zone Integration Project's waste management practices resulted in a larger amount of waste being generated than the waste management organization had been set up to handle

  13. How Do Contractors Select Suppliers for Greener Construction Projects? The Case of Three Swedish Companies

    Directory of Open Access Journals (Sweden)

    Shahin Mokhlesian

    2014-06-01

    Full Text Available There are many studies of contractor selection based on clients and the selection of suppliers by contractors. However, supplier selection specifically related to green construction projects has been much less studied. Green construction differs from conventional construction because of differences in its underlying principles and use of environmentally-friendly materials and technologies. This paper studies how procurers in contractor companies in Sweden adopt green projects and how contractor perception of supplier mastery of green knowledge affects supplier selection. The investigation is based on a set of semi-structured interviews conducted among three large contractors in Sweden. A main finding is that the perceived differences between green and conventional projects do not change supplier selection dramatically. An implication is that “greener projects” is a more appropriate denotation than “green project”. Evidence shows that suppliers’ green knowledge is an important factor in supplier selection, as respondents rated suppliers’ knowledge of green projects as very important, and to fix his, there was a consensus among respondents about the need for close collaboration between contractors and suppliers. To ensure knowledge acquisition from suppliers and to increase their competitive advantage over rivals, contractors collaborate with their suppliers in a partnering setting. It is anticipated that the results of this study will be used to fill the gap in the literature on supplier selection in green projects and can also be used for construction firms contemplating getting involved in green projects.

  14. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    International Nuclear Information System (INIS)

    Certa, P.J.

    1998-01-01

    Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined

  15. Contractor Development Models for Promoting Sustainable Building – a case for developing management capabilities of contractors

    CSIR Research Space (South Africa)

    Dlungwana, Wilkin S

    2004-11-01

    Full Text Available Construction industry and indeed all small and medium-sized contractors play a significant socio-economic role in the developing countries. This paper highlights the importance of promoting sustainable building through the implementation...

  16. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  17. 76 FR 81408 - Contractor Legal Management Requirements; Acquisition Regulations

    Science.gov (United States)

    2011-12-28

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 CFR Parts 931, 952 and 970 RIN 1990-AA37 Contractor Legal... Energy (DOE or Department) is proposing to revise existing regulations covering contractor legal... costs by certain contractors whose contracts exceed $100,000,000 as well as legal counsel retained...

  18. 78 FR 25795 - Contractor Legal Management Requirements; Acquisition Regulations

    Science.gov (United States)

    2013-05-03

    ... DEPARTMENT OF ENERGY 10 CFR Part 719 48 CFR Parts 931, 952, and 970 RIN 1990-AA37 Contractor Legal.... ACTION: Final rule. SUMMARY: The Department of Energy revises existing regulations covering contractor... costs by certain contractors whose contracts exceed $100,000,000 as well as legal counsel retained...

  19. CHANGE OF CONTRACTOR FOR THE FACILITIES MANAGEMENT ACTIVITIES AT CERN

    CERN Document Server

    2003-01-01

    The Facilities Management contract at CERN, under the responsibility of ST Division, Group FM, is in charge of the maintenance and minor works on tertiary installations (i.e. all structures and installations that have no direct relation to the running of the accelerators) for the following trades: - Technical: heating, ventilation, air conditioning, plumbing, electricity, civil engineering (painting, roofing, glazing, blinds, fencing, masonry etc.), cleansing, passenger and goods lifts, automatic and powered doors, kitchen equipment, roads, signs, keys and locks, office furniture, - Services: waste collection, security, green areas, cleaning and sanitary supplies, disinfection, rodent control and insect control. Starting from the 1st June the present contractor will stop some activities that will be taken under its responsibility by the new one, INGEST Facility. Others activities will be moved on the 1st July. Minor perturbation in the service might occur. The contact number will not change and will be opera...

  20. CHANGE OF CONTRACTOR FOR THE FACILITIES MANAGEMENT ACTIVITIES AT CERN

    CERN Document Server

    2003-01-01

    The Facilities Management contract at CERN, under the responsibility of ST Division, Group FM, is in charge of the maintenance and minor works on tertiary installations (i.e. all structures and installations that have no direct relation to the running of the accelerators) for the following trades: - Technical: heating, ventilation, air conditioning, plumbing, electricity, civil engineering (painting, roofing, glazing, blinds, fencing, masonry etc.), cleansing, passenger and goods lifts, automatic and powered doors, kitchen equipment, roads, signs, keys and locks, office furniture, - Services: waste collection, security, green areas, cleaning and sanitary supplies, disinfection, rodent control and insect control. Starting from the 1st June the present contractor will stop some activities that will be taken under its responsibility by the new one, INGEST Facility. The remaining activities (including cleaning) will be moved on the 1st July. Minor perturbation in the service might occur. The contact number will ...

  1. Need of risk management practice amongst bumiputera contractors in Malaysia construction industries

    Science.gov (United States)

    Syuhada Fadzil, Nur; Noor, Nurazuwa Md; Rahman, Ismail Abdul

    2017-11-01

    Malaysia construction industry has been growing continuously with double-digit growth for the past two decades. There are many issues surrounded the industry such as delay in delivery, cost overrun, quality and safety. In bumiputera contractor’s context, the literature review found that 32 issues were encountered in the construction project. These issues can be handled properly with the application of risk management. According to previous researchers, application of risk management in Malaysia construction industry is at the low level where it is implemented in traditional ways that are brainstorming and checklist. These were due to lack of knowledge, the high cost of hiring experts and avoiding extra cost. Besides that, this study also intentions to analyse the risk categories in the construction industry as well as identify risk management process to resolve the construction issues. Hence, this paper presents issues engulfed by Bumiputera contractors which can partly be resolved by applying risk management practice in carrying out the construction activity. This may inspire the contractors to apply the risk management practice in ensuring the success of their construction project.

  2. Repository program update: Management and operating contractor and program transition activities

    International Nuclear Information System (INIS)

    Kale, S.H.

    1989-01-01

    To help assure that the work on the spent-fuel and high-level nuclear waste management system would proceed in a well-structured, systematic, and integrated manner, the US Department of Energy (DOE) concluded in early 1987 that it should obtain a management and operating contractor. To this end, in October 1987, DOE issued a request for a proposal of a management and operating contractor to be responsible for overall systems engineering, development, and management of the nuclear waste management system, (NWMS). On December 9, 1988, DOE announced the selection of Bechtel Systems Management, Inc. (BSMI) for an initial term of 10 yr. At the present time, site characterization work is being carried out by nine major organizations under contract to the Yucca Mountain Project Office in Las Vegas, Nevada. Bechtel Systems Management, Inc., will ensure that work on the NWMS proceeds in an integrated manner to meet technical, schedule, cost, safety, environmental, and quality assurance requirements; that the work meets regulatory requirements of the Nuclear Regulatory Commission (NRC) and the Environmental Protection Agency; and that the work is consistent with applicable DOE orders. The transition plan is described

  3. Project Delivery Acquisition and Contracting Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    MERCADO, L.C.

    2000-01-01

    This document is a plan presenting the process, strategies and approaches for vendor contracting by the Tank Farm Contractor. The plan focuses on contracting structures, practices, methods, and desired approaches in contracting. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has contracted with the CH2M HILL Hanford Group, Inc. (CHG), as the Tank Farm Contractor (TFC), to support vitrification of Hanford Site tank waste by the Privatization Contractor. During Waste Feed Delivery Phase 1, waste will be retrieved from certain double-shell tanks and delivered to the Privatization Contractor to meet contract feed delivery requirements. Near-term project goals include upgrading infrastructure systems; retrieving and delivering the waste; and accepting the waste packages for interim onsite storage and disposal. Project Delivery includes individual projects assigned to provide the infrastructure and systems responsible to provide engineering, design, procurement, installation/construction, and testing/turnover of systems for retrieval of waste from Hanford double-shell tanks. This plan sets the requirements for projects work scope, contracting practices, structures, methods, and performance measurements. The plan is designed to integrate Life-Cycle Projects acquisitions and provide a consistent contracting approach. This effort will serve as a step improvement in contract reform implementing commercial practices into DOE projects

  4. Challenges of UK/Irish Contractors regarding Material Management and Logistics in Confined Site Construction

    Directory of Open Access Journals (Sweden)

    Spillane, John P

    2011-12-01

    Full Text Available The aim of this paper is to identify the various managerial issues encountered by UK/Irish contractors in the management of materials in confined urban construction sites. Through extensive literature review, detailed interviews, case studies, cognitive mapping, causal loop diagrams, questionnaire survey and documenting severity indices, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The leading issues highlighted are: that contractors’ material spatial requirements exceed available space, it is difficult to coordinate the storage of materials in line with the programme, location of the site entrance makes delivery of materials particularly difficult, it is difficult to store materials on-site due to the lack of space, and difficult to coordinate the storage requirements of the various sub-contractors. With the continued development of confined urban centres and the increasing high cost of materials, any marginal savings made on-site would translate into significant monetary savings at project completion. Such savings would give developers a distinct competitive advantage in this challenging economic climate. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of materials on a confined urban construction site becomes attainable.

  5. Game analysis and benefit allocation in international projects among owner, supervisor and contractor

    Science.gov (United States)

    Ding, Hao; Wang, Yong; Guo, Sini; Xu, Xiaofeng; Che, Cheng

    2016-04-01

    International projects are different from general domestic ones. In order to analyse the differences, a tripartite game model is built up to describe the relationship among owner, supervisor and general contractor, and some measures are given for the owner to more effectively complete the project. In addition, a project schedule selection model is formulated and a new benefit allocation method is proposed by introducing a new modified Shapley value with weighted factor.

  6. Contractors perspective for critical factors of cost overrun in highway projects of Sindh, Pakistan

    Science.gov (United States)

    Sohu, Samiullah; Abdullah, Abd Halid; Nagapan, Sasitharan; Fattah, Abdul; Ullah, Kaleem; Kumar, Kanesh

    2017-10-01

    Construction industry of Pakistan is creating a number of opportunities in employment as well as plays a role model for economy development of the country. This construction industry has a serious issue of cost overrun in all construction projects especially in construction of highway projects. Cost overrun is a serious and critical issue in construction of highway projects which gives negative impact to construction practitioners because it is not only cross the approved budget but also approved time of the project. The main objective of this study is to find out critical factors causing cost overrun in highway projects of Sindh according to contractors' perspectives. Deep literature review was carried out and a total of 64 factors of cost overrun were identified. To achieve the objective, a questionnaire was designed and distributed among 16 selected respondents who have more than 20 years of experience in construction of highway projects. The results from analysis found that most critical factors of cost overrun in the order of importance include financial and cash flow difficulties faced by contractor, frequent changes in design, changes in price of materials, poor planning by client, change in scope of project, change in specification of materials and delay in taking decisions. This study will assist contractors to narrow down some of the critical factors that would lead to cost overrun, and therefore be prepared with the ways to mitigate these problems in construction of highway projects of Sindh province.

  7. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    Full Text Available Modern management theory treats all complex tasks and duties like projects and make these projects possible to be managed by a particular organizational-management concept in order to achieve a goal effectively. A large number of jobs and tasks performed in the system of defense or for defense purposes have the characteristics of projects. Project management is both a skill and a science of monitoring human, material, financial, energy and other resources to achieve required objectives within the given limits: deadlines, time, budget, possibility of realization and the satisfaction of the interests of all project participants. Project management is a traditional area of applied (or functional management focused on managing complex and uncertain situations with defined goals. Introduction In conditions of rapid change and high uncertainty, only adaptive organizations survive, i. e. those that are able not only to react quickly to changes but also to proactively take advantage of changes. Development of project management The biggest influence on the development of the area had complex jobs within the engineering profession. In parallel with the traditional approach new approaches began to develop, while the traditional one still remained in use. Contrary to the traditional engineering approach, a dynamic model first developed in order to respond to demands for greater control of costs. Project management Project management is a skill and knowledge of human and material resources to achieve set objectives within prescribed limits: deadlines, time, budget, possibility of realization, and the satisfaction of all participants in the project. In order to realize a project effectively, it is necessary to manage it rationally. Planning and project management A project plan is a document that allows all team members insight on where to go, when to start and when to arrive, what is necessary to be done in order to achieve the project objectives and what

  8. Methodologies of Project Management

    Directory of Open Access Journals (Sweden)

    Wojciech Macek

    2011-07-01

    Full Text Available This paper presents comparison of three most popular project management standardsbelonging to a wider group of models (for example, PMBOK, Prince 2, CMMI, ISO 10006,BS 6079, IPMA Competence Baseline, European Commission Project Cycle ManagementGuidelines. The author discusses methods of project management according to PMBoK,Prince 2 and ISO 10006, some chosen criteria and fields of knowledge, such as generalregulations of standards, project range management, resources management, and processesconnected with risk, systems of project quality management.

  9. 78 FR 71036 - Pipeline Safety: Random Drug Testing Rate; Contractor Management Information System Reporting...

    Science.gov (United States)

    2013-11-27

    ... PHMSA-2013-0248] Pipeline Safety: Random Drug Testing Rate; Contractor Management Information System Reporting; and Obtaining Drug and Alcohol Management Information System Sign-In Information AGENCY: Pipeline... Management Information System (MIS) Data; and New Method for Operators to Obtain User Name and Password for...

  10. Critical Causes and Consequences of Construction Project Interruption: Client, Contractor, Consultant and External Factors Standpoints

    Directory of Open Access Journals (Sweden)

    Nurbasirah Mohamed Alias

    2013-09-01

    Full Text Available It should be pointed out that the dilemma of interruption and stoppage in the construction industry is a large-scale trend. Construction interruption and stoppage is considered one of the most recurring problems in the construction industry. Construction Interruption and stoppage is always measured as costly to all parties concerned in the projects and very often it will result in clash, claims, total desertion and much difficult for the feasibility and it slows the growth of construction sector. The objective of the research work that underpins this paper was to investigate the Factors and Consequences of construction projects on local contractors. A construction project is commonly acknowledged as successful when the aim of the project is achieved in terms of predetermined objectives that are mainly completed the project on time, within budget and specified quality in accordance with the specifications and to stakeholders’ satisfaction. One of the most important problems that may arise in the construction project is delays and the magnitude of these delays varies considerably from project to project. According to delay categories that were contractor related, client related, consultant related, labour related and external related, the study revealed the six major effects of delay that were time overrun, cost overrun, dispute, arbitration, total abandonment, and litigation.

  11. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  12. Managing Projects for Change: Contextualised Project Management

    Science.gov (United States)

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  13. 76 FR 16818 - Central Valley Project Improvement Act, Standard Criteria for Ag and Urban Water Management Plans

    Science.gov (United States)

    2011-03-25

    ... Valley Project water conservation best management practices (BMPs) that shall develop Criteria for... project contractors using best available cost- effective technology and best management practices.'' The... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Standard...

  14. Project Communications Management

    OpenAIRE

    José C. Santiago-Guevara; Mauricio Rojas-Contreras; Luis A. Esteban-Villamizar

    2013-01-01

    This article presents a review in relation to the object of study: Communications Management as an important factor in the management of projects. The review includes the most relevant and most renowned authors in the field of project management, focusing on telecommunications projects, which lets you define a communications management model.

  15. Managing clinical improvement projects.

    Science.gov (United States)

    Phillips, Joanna; Simmonds, Lorraine

    This paper, the second of a three-part series looking at change management tools, provides a practical guide on how to use common project management principles in practice. Much of the literature on project management focuses on the business arena, with little reference to clinical settings. Identifying this literature and understanding its relevance to managing projects in healthcare can be difficult. This article provides a practical guide to identifying the key principles of good project management and applying these in health settings.

  16. Modern project-management

    CERN Multimedia

    CERN. Geneva

    2003-01-01

    This lecture will focus on the following issues: - The current state of the art in Project Management, especially the integration of Project Management with general management activities, and the integrated view of resources allocation. - Overview of the project life cycle, the phases and the deliverables - Necessity and limits of planning in a research environment - Organizational aspects of the projects the roles of the stakeholders - How to get the resources when they are needed - Risk Management in Projects - Earned value - How to keep a project on track (schedule and budget) - Management of the suppliers - Closing of the project

  17. Research 0n Incentive Mechanism of General Contractor and Subcontractors Dynamic Alliance in Construction Project Based on Team Cooperation

    Science.gov (United States)

    Yin, Honglian; Sun, Aihua; Liu, Quanru; Chen, Zhiyi

    2018-03-01

    It is the key of motivating sub-contractors working hard and mutual cooperation, ensuring implementation overall goal of the project that to design rational incentive mechanism for general contractor. Based on the principal-agency theory, the subcontractor efforts is divided into two parts, one for individual efforts, another helping other subcontractors, team Cooperation incentive models of multiple subcontractors are set up, incentive schemes and intensities are also given. The results show that the general contractor may provide individual and team motivation incentives when subcontractors working independently, not affecting each other in time and space; otherwise, the general contractor may only provide individual incentive to entice teams collaboration between subcontractors and helping each other. The conclusions can provide a reference for the subcontract design of general and sub-contractor dynamic alliances.

  18. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  19. Project management at a university

    Science.gov (United States)

    Eaton, Joel A.

    2006-06-01

    Managing instrumentation projects, large or small, involves a number of common challenges-defining what is needed, desiging a system to provide it, producing it in an economical way, and putting it into service expeditiously. Doing these things in a university environoment provides unique challenges and opportunities not obtaining in the environment of large projects at NASA or national labs. I address this topic from the viewpoint of knowledge of two such projects, the development of OAO-2 at the University of Wisconsin and the relocation of Fairborn Observatory to the Patagonia Mountains in Arizona, as well as my own developemnt of the Tennessee State 2-m Automatic Spectroscopic Telescope. For the university environment, I argue for a more traditional management style that relies on more informal techniques than those used in large-scale projects conducted by big bureaucratic institutions. This style identifies what tasks are really necessary and eliminates as much wasteful overhead as possible. I discuss many of the formalities used in project management, such as formal reviews (PDR, CDR, etc.) and Gantt charts, and propose other ways of acheving the same results more effectively. The university environment acutely requires getting the right people to do the project, both in terms of their individual personalities, motivation, and technical skills but also in terms of their ability to get on with one another. Two critical challenges confronting those doing such projects in universities are 1) keeping the contractors on task (the major challenge to anyone doing project management) and 2) dealing with the purchasing systems in such institutions.

  20. Project management process.

    Science.gov (United States)

    2007-03-01

    This course provides INDOT staff with foundational knowledge and skills in project management principles and methodologies. INDOTs project management processes provide the tools for interdisciplinary teams to efficiently and effectively deliver pr...

  1. Structured Transition of Wind Tunnel Operations Skills from Government-to Contractor-Managed

    Science.gov (United States)

    Dunn, Steven C.; Schlank, John J.

    2010-01-01

    In 2004, NASA awarded the Research, Operations, Maintenance, and Engineering (ROME) contract at NASA Langley Research Center to a team led by Jacobs Technology, Inc. A key component of the contract was the transitioning of the five large wind tunnel facilities from NASA managed and NASA or NASA/contractor workforces to fully contractor operated. The contractor would manage daily operations while NASA would continue to develop long-term strategies, make decisions regarding commitment of funds and commitment of facilities, and provide oversight of the contractor's performance. A major challenge would be the transition of knowledge of facility operations and maintenance from the incumbent civil servant workforce to the contractor workforce. While the contract has since been modified multiple times, resulting in a blended NASA/ROME workforce across the facilities, the processes developed and implemented to capture and document facility knowledge from the incumbent subject matter experts, build training and certification programs, and grow individual skills across subject areas and across facilities, are worthy of documentation. This is the purpose of this paper.

  2. Project management case studies

    CERN Document Server

    Kerzner, Harold R

    2013-01-01

    A new edition of the most popular book of project management case studies, expanded to include more than 100 cases plus a ""super case"" on the Iridium Project Case studies are an important part of project management education and training. This Fourth Edition of Harold Kerzner''s Project Management Case Studies features a number of new cases covering value measurement in project management. Also included is the well-received ""super case,"" which covers all aspects of project management and may be used as a capstone for a course. This new edition:Contains 100-plus case studies drawn from re

  3. Designing Project Management

    NARCIS (Netherlands)

    Heintz, John Linke; Lousberg, L.; Wamelink, J.W.F.; Saari, A.; Huovinen, P.

    2016-01-01

    In this paper we introduce the concept of Designing Project Management. On the basis of our earlier work, we suggest that there is still a gap between what is known from recent project management literature and what project managers can structurally help in the effectiveness of their work. Assuming

  4. MRS project management

    International Nuclear Information System (INIS)

    Doman, J.W.; Vlahakis, J.

    1992-01-01

    Management of projects under the control of the Office of Civilian Radioactive Waste Management within the Department of Energy is subject to overview by a variety of internal and external entities. This paper reports that effective project management often requires balancing of conflicting directions and conflicting agendas of the different entities in order to proceed with implementation of the Monitored Retrievable Storage project

  5. Exploring factors affecting owners' trust of contractors in construction projects: a case of China.

    Science.gov (United States)

    Tai, Shuangliang; Sun, Chengshuang; Zhang, Shoujian

    2016-01-01

    It has been found that a low level of trust among members of a construction project team leads to poor performance in China. Many researchers have described the challenges, consequently advocating partnering as an attractive approach for more valuable cooperation. Because substantial investments have been poured into construction projects since the year 2000, trust research will improve the performance of construction projects and will be meaningful to the Chinese construction industry. The purpose of this paper is to investigate the attributes affecting owners' trust of contractors, to understand the potential properties of these factors, and to rank the factors in order of importance. Twenty-four attributes are identified from a literature review. Supported by qualitative reviews, a questionnaire is conducted to obtain relevant data, and 168 valid responses are obtained for data analysis. Principal component analysis (PCA) is employed to find the factor structure of the identified trust attributes. By the method of PCA, the attributes are extracted into eight factors, including interaction history, information sharing and communication, contract and institution, relation-specific investment, reputation, integrity, competence, and opportunistic behaviour. The value and originality of this paper are embodied in using PCA to understand the various attribute groupings and to illuminate trust impact factors in the Chinese context. When they understand the critical factors affecting trust better, owners and contractors can devise more appropriate strategies to improve performance.

  6. Web Project Management

    OpenAIRE

    Suralkar, Sunita; Joshi, Nilambari; Meshram, B B

    2013-01-01

    This paper describes about the need for Web project management, fundamentals of project management for web projects: what it is, why projects go wrong, and what's different about web projects. We also discuss Cost Estimation Techniques based on Size Metrics. Though Web project development is similar to traditional software development applications, the special characteristics of Web Application development requires adaption of many software engineering approaches or even development of comple...

  7. Project Risk Management

    Science.gov (United States)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  8. 41 CFR 109-1.5204 - Review and approval of a designated contractor's personal property management system.

    Science.gov (United States)

    2010-07-01

    ... property management system. (a) An initial review of a designated contractor's personal property management... follow-on contract. The purpose of the review is to determine whether the contractor's system provides... by the property administrator that all major system deficiencies identified in the review or...

  9. Project stakeholder management

    CERN Document Server

    Eskerod, Pernille

    2013-01-01

    Carrying out a project as planned is not a guarantee for success. Projects may fail because project management does not take the requirements, wishes and concerns of stakeholders sufficiently into account. Projects can only be successful though contributions from stakeholders. And in the end, it is the stakeholders that evaluate whether they find that the project is a success. To manage stakeholders effectively, you need to know your stakeholders, their behaviours and attitudes towards the project. In Project Stakeholder Management, the authors give guidance on how to adopt an analytical and s

  10. Modern project management theory and knowledge framework

    Institute of Scientific and Technical Information of China (English)

    Luo Zhongbao

    2014-01-01

    The scholars increasingly pay at ention to the internal rules in knowledge development and innovation of construction engineering management,as wel as the framework for engineering management body of knowledge. Considering the one-of-a-kind characteristic of construction project s and highly dependence from projects on management knowledge and its innovation,this paper analyzed the knowledge body of engineering management and its development dimension ,such as thinking and knowledge structure dimensions. The engineering management knowledge innovation model and structural model were put forward. The paper reviewed and proposed the engineering management knowledge system framework under engineering thinking mode,including the basic knowledge system framework which is used in engineering management research ,and a framework for body of knowledge which is applicable for engineering management practice. Based on a brief analysis of engineering management practice,this paper analyzed the development progres of engineering management from engineering thinking to ethical thinking and philosophical thinking. A dynamic model formed from the modern engineering management theory was put forward. The construction of projects are divided into two stages:an investment decision-making stage, and project implementation stage. According to the fact that project owners obtain the project products by transaction,the management during project implementation stage are divided into two aspects:project transaction management for the owner, and construction project management for the contractor. Thus, the three theoretical modules of modern engineering management were established:project investment decision-making management theory,engineering transaction management theory, and engineering project management theory. This paper further analyzed the content and basic theoretical issues of each theoretical module.

  11. IT Project Management Metrics

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available Many software and IT projects fail in completing theirs objectives because different causes of which the management of the projects has a high weight. In order to have successfully projects, lessons learned have to be used, historical data to be collected and metrics and indicators have to be computed and used to compare them with past projects and avoid failure to happen. This paper presents some metrics that can be used for the IT project management.

  12. ORGANIZATIONAL PROJECT MANAGEMENT MATURITY

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2017-11-01

    Full Text Available The present article is aimed at developing a set of recommendations for achieving a higher level of organizational project maturity at a given enterprise. Methodology. For the purposes of the current research, the available information sources on the components of project management system are analysed; the essence of “organizational maturity” and the existing models of organizational maturity are studied. The method of systemic and structural analysis, as well as the method of logical generalization, are employed in order to study the existing models of organizational maturity, to describe levels of organizational maturity, and finally to develop a set of methodological recommendations for achieving a higher level of organizational project maturity at a given enterprise. The results of the research showed that the core elements of project management system are methodological, organizational, programtechnical, and motivational components. Project management encompasses a wide range of issues connected with organizational structure, project team, communication management, project participants, etc. However, the fundamental basis for developing project management concept within a given enterprise starts with defining its level of organizational maturity. The present paper describes various models of organizational maturity (staged, continuous, petal-shaped and their common types (H. Кеrzner Organizational Maturity Model, Berkeley PM Maturity Model, Organizational Project Management Maturity Model, Portfolio, Program & Project Management Maturity Model. The analysis of available theoretic works showed that the notion “organizational project maturity” refers to the capability of an enterprise to select projects and manage them with the intention of achieving its strategic goals in the most effective way. Importantly, the level of maturity can be improved by means of formalizing the acquired knowledge, regulating project-related activities

  13. Successful project management

    CERN Document Server

    Young, Trevor L

    2016-01-01

    Successful Project Management, 5th edition, is an essential guide for anyone who wants to improve the success rate of their projects. It will help managers to maintain a balance between the demands of the customer, the project, the team and the organization. Covering the more technical aspects of a project from start to completion it contains practised and tested techniques, covering project conception and start-up, how to manage stake holders, effective risk management, project planning and launch and execution. Also including a brand new glossary of key terms, it provides help with evaluating your project as well as practical checklists and templates to ensure success for any ambitious project manager. With over one million copies sold, the hugely popular Creating Success series covers a wide variety of topic, with the latest editions including new chapters such as Tough Conversations and Treating People Right. This indispensable business skills collection is suited to a variety of roles, from someone look...

  14. Earned value project management

    CERN Document Server

    Fleming, Quentin W

    2010-01-01

    Organizations that follow the principles of good Earned Value Management (EVM) create an environment that allows teams to successfully operate and thrive ? even in the face of challenges that could negatively impact their projects. Earned Value Project Management (EVPM) is a methodology used to measure and communicate the real physical progress of a project taking into account the work completed, the time taken and the costs incurred to complete that work. As a result, EVPM allows more educated and effective management decision-making, which helps evaluate and control project risk by measuring project progress in monetary terms. In the first two editions of Earned Value Project Management, Quentin W. Fleming and Joel M. Koppelman provided guidance for project management practitioners already familiar with EVPM, was well as those who were new to the use of this technique. The third edition expanded the information available on of EVPM for medium and smaller projects while still being relevant for larger projec...

  15. Fundamentals of Project Management

    CERN Document Server

    Heagney, Joseph

    2011-01-01

    With sales of more than 160,000 copies, Fundamentals of Project Management has helped generations of project managers navigate the ins and outs of every aspect of this complex discipline. Using a simple step-by-step approach, the book is the perfect introduction to project management tools, techniques, and concepts. Readers will learn how to: ò Develop a mission statement, vision, goals, and objectives ò Plan the project ò Create the work breakdown structure ò Produce a workable schedule ò Understand earned value analysis ò Manage a project team ò Control and evaluate progress at every stage.

  16. Challenges of UK/Irish Contractors regarding Material Management and Logistics in Confined Site Construction

    OpenAIRE

    Spillane, John P; Oyedele, Lukumon O; Von Meding, Jason; Konanahalli, Ashwini; Jaiyeoba, Babatunde E; Tijani, Iyabo K

    2011-01-01

    The aim of this paper is to identify the various managerial issues encountered by UK/Irish contractors in the management of materials in confined urban construction sites. Through extensive literature review, detailed interviews, case studies, cognitive mapping, causal loop diagrams, questionnaire survey and documenting severity indices, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The leading issues...

  17. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  18. Managing Distributed Software Projects

    DEFF Research Database (Denmark)

    Persson, John Stouby

    Increasingly, software projects are becoming geographically distributed, with limited face-toface interaction between participants. These projects face particular challenges that need careful managerial attention. This PhD study reports on how we can understand and support the management...... of distributed software projects, based on a literature study and a case study. The main emphasis of the literature study was on how to support the management of distributed software projects, but also contributed to an understanding of these projects. The main emphasis of the case study was on how to understand...... the management of distributed software projects, but also contributed to supporting the management of these projects. The literature study integrates what we know about risks and risk-resolution techniques, into a framework for managing risks in distributed contexts. This framework was developed iteratively...

  19. Remedial Action and Waste Disposal Project Manager's Implementing Instructions

    International Nuclear Information System (INIS)

    Dronen, V.R.

    1998-01-01

    These Project Manager's Implementing Instructions provide the performance standards required of all Environmental Restoration Contractor personnel in their work during operation and administration of the Remedial Action and Waste Disposal Project. The instructions emphasize technical competency, workplace discipline, and personal accountability to ensure a high level of safety and performance during operations activities

  20. School Building Projects: Managing Insurance and Contracts during Construction

    Science.gov (United States)

    Shands, Richard

    2011-01-01

    Managing the risks inherent in a building project presents a challenge and opportunities not often encountered in the ordinary affairs of a school district. A building project brings the district, its staff, and students, as well as the community, in close contact with architects and engineers and a number of contractors for a period of time often…

  1. Integrated Safety Management System Phase 1 and 2 Verification for the Environmental Restoration Contractor Volumes 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    CARTER, R.P.

    2000-04-04

    DOE Policy 450.4 mandates that safety be integrated into all aspects of the management and operations of its facilities. The goal of an institutionalized Integrated Safety Management System (ISMS) is to have a single integrated system that includes Environment, Safety, and Health requirements in the work planning and execution processes to ensure the protection of the worker, public, environment, and the federal property over the life cycle of the Environmental Restoration (ER) Project. The purpose of this Environmental Restoration Contractor (ERC) ISMS Phase MI Verification was to determine whether ISMS programs and processes were institutionalized within the ER Project, whether these programs and processes were implemented, and whether the system had promoted the development of a safety conscious work culture.

  2. Construction project management handbook.

    Science.gov (United States)

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  3. Identifying environmental safety and health requirements for an Environmental Restoration Management Contractor

    International Nuclear Information System (INIS)

    Beckman, W.H.; Cossel, S.C.; Alhadeff, N.; Lindamood, S.B.; Beers, J.A.

    1993-10-01

    The purpose of the Standards/Requirements Identification Program, developed partially in response to the Defense Nuclear Facilities Safety Board Recommendation 90-2, was to identify applicable requirements that established the Environmental Restoration Management Contractor's (ERMC) responsibilities and authorities under the Environmental Restoration Management Contract, determine the adequacy of these requirements, ascertain a baseline level of compliance with them, and implement a maintenance program that would keep the program current as requirements or compliance levels change. The resultant Standards/Requirements Identification Documents (S/RIDs) consolidate the applicable requirements. These documents govern the development of procedures and manuals to ensure compliance with the requirements. Twenty-four such documents, corresponding with each functional area identified at the site, are to be issued. These requirements are included in the contractor's management plan

  4. Project management for engineers

    CERN Document Server

    Bennett, Michael J

    2014-01-01

    Project Management for Engineers, as the title suggests, is a direct attempt at addressing the ever-increasing and specific needs for better project management of engineering students, practicing engineers and managers in the industry. It aims not only to present the principles and techniques of Project Management, but also to discuss project management standards, processes and requirements, such as PMBOK, IEEE and PRINCE. Each chapter begins with the basics of the theme being developed at a level understandable to an undergraduate, before more complex topics are introduced at the end of each section that are suitable for graduate students. For the practicing professionals or managers in the industry, the book also provides many real illustrations of practical application of the principles of Project Management. Through a realistic blend of theory and practical examples, as well as an integration of the engineering technical issues with business issues, this book seeks to remove the veil of mystery that has...

  5. Project Management Techniques

    OpenAIRE

    Mihalache Anita; Salagean Liana

    2010-01-01

    Project management is a technique that can aid in the planning, scheduling, and monitoring of complex projects characterized by numerous, non repetitive jobs called activities. Examples of projects that would use project management include: - developing a mass rapid – transit system for a metropolitan area; - organizing the relocation of a corporate headquarters; - planning the production of a concert, film, or play; - developing and marketing a new automobile; - constructing a high – rise of...

  6. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  7. Principles of project management

    Science.gov (United States)

    1982-01-01

    The basic principles of project management as practiced by NASA management personnel are presented. These principles are given as ground rules and guidelines to be used in the performance of research, development, construction or operational assignments.

  8. Project W-519 CDR supplement: Raw water and electrical services for privatization contractor, AP tank farm operations

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This supplement to the Project W-519 Conceptual Design will identify a means to provide RW and Electrical services to serve the needs of the TWRS Privatization Contractor (PC) at AP Tank Farm as directed by DOE-RL. The RW will serve the fire suppression and untreated process water requirements for the PC. The purpose of this CDR supplement is to identify Raw Water (RW) and Electrical service line routes to the TWRS Privatization Contractor (PC) feed delivery tanks, AP-106 and/or AP-108, and establish associated cost impacts to the Project W-519 baseline

  9. MANAGING MULTICULTURAL PROJECT TEAMS

    Directory of Open Access Journals (Sweden)

    Cezar SCARLAT

    2014-06-01

    Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.

  10. Groundwater/Vadose Zone Integration Project Management Plan

    International Nuclear Information System (INIS)

    Hughes, M. C.

    1999-01-01

    This Project Management Plan (PMP) defines the authorities, roles, and responsibilities of the US Department of Energy (DOE), Richland Operations Office (RL) and those contractor organizations participating in the Hanford Site' s Groundwater/Vadose Zone (GW/VZ) Integration Project. The PMP also describes the planning and control systems, business processes, and other management tools needed to properly and consistently conduct the Integration Project scope of work

  11. River Protection Project: Interface Management in the Multi Contract Project Environment at Hanford

    International Nuclear Information System (INIS)

    SHIKASHIO, L.A.

    2000-01-01

    The Office of River Protection (ORP) is implementing the River Protection Project (RPP) using two prime contractors. CH2M Hill Hanford Group, Inc. (CHG) is responsible for operating the existing tank system, delivering the waste feed to the waste treatment plant, and managing the resulting low- and high-level glass waste ''product'' through a performance-based fee type contract. A separate prime contractor will be responsible for designing, constructing and commissioning of a new Waste Treatment and Immobilization Plant (WTP), and preparing the waste for ultimate disposal. In addition to the prime contractors and their interfaces, the River Protection Project is being conducted on the Hanford Site, which is under the management of another DOE organization, DOE Richland Field Office (DOE-RL). The infrastructure and utilities are provided by DOE-RL, for example. In addition, there are multiple other technical interfaces with federal, state and other regulatory agencies that influence the management of the activities. This paper provides an overview of the approach employed by ORP to identify, coordinate, and manage the technical interfaces of RPP. In addition, this paper describes the approach and methodologies used to: Establish an overall framework for interface management. Establish the requirements for defining and managing interfaces for the prime contractors and DOE. Contractually requiring the prime contractors to control and manage the interfaces

  12. Managing Stress. Project Seed.

    Science.gov (United States)

    Muto, Donna; Wilk, Jan

    One of eight papers from Project Seed, this paper describes a stress management project undertaken with high school sophomores. Managing Stress is described as an interactive workshop that offers young people an opportunity to examine specific areas of stress in their lives and to learn effective ways to deal with them. The program described…

  13. Managing Projects with KPRO

    Science.gov (United States)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  14. Project Management Performance Drivers

    OpenAIRE

    Ra’ad, Mohammed A.; Najdawi, Mohammad K.

    2010-01-01

    The practice of project management has gained enormous importance over the past several years in various business industries. “In industries as diverse as pharmaceuticals, software, and aerospace, projects drive business” (Wheatley). This gain of importance can be attributed to the magnitude of the impact project performance results in terms of time, cost, and scope have over the project performing entity. “On the basis of data released by the Bureau of Economic Analysis, part of the US De...

  15. Health and safety management practices of contractors in South East Asia: A multi country study of Cambodia, Vietnam, and Malaysia

    OpenAIRE

    Manu, P.; Mahamadu, A.-M. ed; Phung, V. M.; Nguyen, T. T.; Ath, C.; Heng, A. Y. T.; Kit, S. C.

    2017-01-01

    The construction sector is notorious for accounting for numerous occupational deaths, injuries and illnesses in many countries. In emerging economies this situation could be direr, and health and safety (H&S) management by contractors is important to tackling this. This study investigated the H&S management practices of contractors in three South East Asian countries (Malaysia, Vietnam, and Cambodia) with the view to highlighting implementation issues. A questionnaire instrument containing 40...

  16. Project Management and the Project Manager: A Strategy for ...

    African Journals Online (AJOL)

    International Journal of Development and Management Review ... collapse, project failure, project abandonment, project cost and time overruns, etc. ... component parts that constitute project management in the building construction industry.

  17. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    OpenAIRE

    Tamara Gvozdenovic; Mirjana Miljanovic; Aleksandar Jegdic; Zeljko Crnogorcic

    2008-01-01

    One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviatio...

  18. Organization of project management

    International Nuclear Information System (INIS)

    Schmidt, R.

    1975-01-01

    When speaking about interfaces within a project and their management, one has to understand and define what an interface is. In general, each component facing another one and each person working on a project with another person represents an interface. Therefore a project will consist practically in its entirety of interfaces with components and people sandwiched between them. This paper is limited to the most important interfaces with a focus on the problems occuring at them and their resolution. (orig.) [de

  19. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  20. HERMES project management I

    CERN Multimedia

    CERN. Geneva

    2013-01-01

    A two-hours course on the HERMES Project Management Methodology to the attention of Project Leaders and Project Participants. The methodology is quickly presented; the focus is put on the roles and responsibilities and on the project initiation phase. The course is given in French with slides in English. On April 22nd 2013, a new version of the HERMES methodology was made public. For practical reasons, this course is still given based on the 2009 version of HERMES (a.k.a. HERMES 4).

  1. Scrum Project Management

    CERN Document Server

    Pries, Kim H

    2010-01-01

    Scrum, which was originally invented solely for software development, can now be applied to all types of projects. This book shows project managers how to implement Scrum by explaining the artifacts, rituals, and roles used. The text provides Scrum planning methods to control project scope and schedule as well as Scrum tracking methods to focus teams on improving throughput and streamlining communications. The authors show how to combine traditional project methods with Scrum and how to adapt the familiar work breakdown structure to create Scrum backlogs and sprints. They also demonstrate how

  2. Project management in health informatics.

    Science.gov (United States)

    Ho, Jessica

    2010-01-01

    This chapter gives an educational overview of: * the concept of project management and its role in modern management * the generic project lifecycle process * processes used in developing a plan for the management of resources - time, cost, physical resources and people * the concept of managing risk in projects * communication processes and practices that are important to the management of projects.

  3. Contractor Software Charges

    National Research Council Canada - National Science Library

    Granetto, Paul

    1994-01-01

    .... Examples of computer software costs that contractors charge through indirect rates are material management systems, security systems, labor accounting systems, and computer-aided design and manufacturing...

  4. Annual DOE active solar heating and cooling contractors' review meeting. Premeeting proceedings and project summaries

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1981-09-01

    Ninety-three project summaries are presented which discuss the following aspects of active solar heating and cooling: Rankine solar cooling systems; absorption solar cooling systems; desiccant solar cooling systems; solar heat pump systems; solar hot water systems; special projects (such as the National Solar Data Network, hybrid solar thermal/photovoltaic applications, and heat transfer and water migration in soils); administrative/management support; and solar collector, storage, controls, analysis, and materials technology. (LEW)

  5. Agile & Distributed Project Management

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Pries-Heje, Lene

    2011-01-01

    Scrum has gained surprising momentum as an agile IS project management approach. An obvious question is why Scrum is so useful? To answer that question we carried out a longitudinal study of a distributed project using Scrum. We analyzed the data using coding and categorisation and three carefully...... selected theoretical frameworks. Our conclusion in this paper is that Scrum is so useful because it provides effective communication in the form of boundary objects and boundary spanners, it provides effective social integration by building up social team capital, and it provides much needed control...... and coordination mechanisms by allowing both local and global articulation of work in the project. That is why Scrum is especially useful for distributed IS project management and teamwork....

  6. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Tamara Gvozdenovic

    2008-03-01

    Full Text Available One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviations from the previously set quality standards. Basic processes of project quality management are: quality planning, quality assurance and quality control.

  7. Agile Project Portfolio Management

    DEFF Research Database (Denmark)

    Andersen, Jesper Rank; Riis, Jens Ove; Mikkelsen, Hans

    2005-01-01

    This paper will provide a preliminary introduction to the application of Agile Thinking in management of project portfolio and company development. At any point in time, companies have a crowd of development initiatives spread around the organisation and managed at different levels...... in the managerial hierarchy. They compete for resources and managerial attention, and they often take too long time - and some do not survive in the rapid changing context. Top man¬agers ask for speed, flexibility and effectiveness in the portfolio of development activities (projects). But which competencies...

  8. 78 FR 63491 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2013-10-24

    ... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review: Westside... project contractors using best available cost-effective technology and best management practices.'' These...

  9. Project management tool

    Science.gov (United States)

    Maluf, David A. (Inventor); Bell, David G. (Inventor); Gurram, Mohana M. (Inventor); Gawdiak, Yuri O. (Inventor)

    2009-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as a monthly report, a task plan report, a budget report and a risk management report, are generated and made available for display or further analysis. An extensible database allows searching for information based upon context and upon content.

  10. Municipal solid waste management: A bibliography of US Department of Energy contractor reports through 1993

    Energy Technology Data Exchange (ETDEWEB)

    Shepherd, P

    1994-07-01

    US Department of Energy contractors continue to conduct research targeting the productive and responsible use of the more than 536,000 tons of municipal solid waste (MSW) that is generated each day in the United States. It is becoming more and more prudent to improve current methods of MSW management and to continue to search for additional cost-effective, energy-efficient means to manage our MSW resource. This bibliography is an updated version of Municipal Waste to Energy: An Annotated Bibliography of US Department of Energy Contractor Reports, by Caroline Brooks, published in 1987. Like its predecessor, this bibliography provides information about technical reports on energy from municipal waste that were prepared under grants or contracts from the US Department of Energy. The reports listed focus on energy from municipal waste technologies and energy conservation in wastewater treatment. The bibliography contains three indexes -- an author index, a subject index, and a title index. The reports are listed alphabetically in the subject areas and may appear under more than one subject. All of the reports cited in the original MSW bibliography are also included in this update. The number of copies of each report originally published varied according to anticipated public demand. However, all reports are available in either microfiche or hard copy form and may be ordered from the National Technical Information Service (NTIS), US Department of Commerce, Springfield, VA 22161. Explicit information on ordering reports is included in Appendix A.

  11. Report: Management Alert - EPA Has Not Initiated Required Background Investigations for Information Systems Contractor Personnel

    Science.gov (United States)

    Report #17-P-0409, September 27, 2017. Not vetting contractor personnel before granting them network access exposes the EPA to risks. Contractor personnel with potentially questionable backgrounds who access sensitive agency data could cause harm.

  12. From project management to project leadership

    NARCIS (Netherlands)

    Braun, F.; Avital, M.

    2010-01-01

    It is virtually a truism that good leadership practices can help project managers with attaining the desired project outcome. However, a better understanding of which leadership practices enable project managers to be more effective warrants further investigation. Subsequently, in this study, we

  13. An IS Project Management Course Project

    Science.gov (United States)

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  14. SAT project introduction: management issues

    International Nuclear Information System (INIS)

    Kazennov, A.Yu.

    1998-01-01

    Management issues of introducing SAT Project include main objectives and expectations; SAT goal and management; major phases of SAT implementation; project quality assurance; SAT based training system and procedures; role of the project team qualifications

  15. Ensuring effective project management

    International Nuclear Information System (INIS)

    Ward, J.N.

    1980-01-01

    A brief description is given of the organisation methods employed by the Bechtel Power Corporation, in their contract with Mississippi Power and Light Company for the design, construction and procurement activities for the Grand Gulf Nuclear Station. The aim is to ensure effective management, and good communications at all stages of construction, between the project team and the client. (U.K.)

  16. Exploring Project Management Education

    NARCIS (Netherlands)

    Steven Nijhuis

    2017-01-01

    From the article: "The object of this paper is to explore the actual practice in project management education in the Netherlands and compare it to reference institutions and recent literature. A little over 40% of the Higher Education institutions in the Netherlands mentions PM education in

  17. Enhanced project management tool

    Science.gov (United States)

    Hsu, Chen-Jung (Inventor); Patel, Hemil N. (Inventor); Maluf, David A. (Inventor); Moh Hashim, Jairon C. (Inventor); Tran, Khai Peter B. (Inventor)

    2012-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.

  18. Managing a sensitive project

    International Nuclear Information System (INIS)

    Etcheber, Pascal

    1998-01-01

    A 'sensitive' project needs to be managed differently from a 'normal' project. This statement might seem simple enough. However, it does not seem to be a simple task to prove it in twenty minutes. This paper is an attempt to share with the audience some of the experiences the company had dealing with sensitive projects. It describes what a sensitive project is, though of all people, the 'nuclear' should know. Then the common mistakes are described, that are made in the hoping that some personal experiences are recognised. Finally the company's strategy is shown, how we foster third party support and the main tools to be used. Ultimately, success is ensured by having a sufficient quantity of allies. A sensitive project does not die because it has too many opponents, but because it has too few allies. Finding and helping allies to act is the thrust of our activity. It enables sensitive projects which deserve to succeed to do so, where traditional management fails miserably

  19. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  20. Municipal solid waste management: A bibliography of US Department of Energy contractor report through 1994

    Energy Technology Data Exchange (ETDEWEB)

    None

    1995-09-01

    U.S. Department of Energy contractors continue to conduct research targeting the productive and responsible use of the more than 516,000 metric tons (567,000 tons) of municipal solid waste (MSW) that is generated each day in the United States. It is becoming more and more prudent to improve current methods of MSW management and to continue to search for additional cost-effective, energy-efficient means to manage our MSW resource. This bibliography provides information about technical reports on energy from municipal waste that were prepared under grants or contracts from the US DOE. The reports listed focus on energy from municipal waste technologies and energy conservation in wastewater treatment.

  1. Web Based Project Management System

    OpenAIRE

    Aadamsoo, Anne-Mai

    2010-01-01

    To increase an efficiency of a product, nowadays many web development companies are using different project management systems. A company may run a number of projects at a time, and requires input from a number of individuals, or teams for a multi level development plan, whereby a good project management system is needed. Project management systems represent a rapidly growing technology in IT industry. As the number of users, who utilize project management applications continues to grow, w...

  2. Management & Communication: Project Management Case Study

    CERN Multimedia

    Nathalie Dumeaux

    2004-01-01

    We are pleased to announce the recent launch of a new workshop on Project Management. This is designed for People with budgetary, scheduling and/or organizational responsibilities in a project or a sub-project. The objectives through a management case study specially suited to CERN are: to become familiar with modern management techniques in use for structuring, planning, scheduling, costing and progress monitoring of a project or a sub-project. to understand in-depth issues associated with Deliverable-oriented Project Management, Earned Value Management, Advanced Project Cost Engineering and Project Risk Management. The full description of this workshop can be found here. The next session will be held on 8 October 2004. If you are interested in this workshop, please contact Nathalie Dumeaux, email or 78144. Programme of Seminars October to December 2004 Situation : 21.09.2004 Séminaires bilingues Dates Jours Places disponibles Project Management Case study 8 October 1 oui Intr...

  3. Switchgear project meticulously managed.

    Science.gov (United States)

    Baillie, Jonathan

    2015-04-01

    Electrical engineering and estates personnel at Sodexo--which manages a wide range of soft and hard facilities management services for five hospitals under a PFI contract at the Manchester Royal Infirmary--have successfully planned, managed, and co-ordinated, a complex electrical engineering project which saw high voltage (HV) switchgear in the site's main intake sub-station dismantled by the supplier to repair a potential earthing mechanism fault which would have prevented individual switchgear panels being shut down, to, for example, cater for renovation of electrical cabling or components cross the site's high voltage network. With detailed planning, including provision for bringing onto site temporary bulk generators, and the formulation of a 600-step switching programme, the replacement of potential faulty driver components in the disconnect mechanism for 20 HV switchgear panels was completed in just four weeks, with minimal interruption to the vast complex's power supply.

  4. Kennedy Space Center's NASA/Contractor Team-Centered Total Quality Management Seminar: Results, methods, and lessons learned

    Science.gov (United States)

    Kinlaw, Dennis C.; Eads, Jeannette

    1992-01-01

    It is apparent to everyone associated with the Nation's aeronautics and space programs that the challenge of continuous improvement can be reasonably addressed only if NASA and its contractors act together in a fully integrated and cooperative manner that transcends the traditional boundaries of proprietary interest. It is, however, one thing to assent to the need for such integration and cooperation; it is quite another thing to undertake the hard tasks of turning such a need into action. Whatever else total quality management is, it is fundamentally a team-centered and team-driven process of continuous improvement. The introduction of total quality management at KSC, therefore, has given the Center a special opportunity to translate the need for closer integration and cooperation among all its organizations into specific initiatives. One such initiative that NASA and its contractors have undertaken at KSC is a NASA/Contractor team-centered Total Quality Management Seminar. It is this seminar which is the subject of this paper. The specific purposes of this paper are to describe the following: Background, development, and evolution of Kennedy Space Center's Total Quality Management Seminar; Special characteristics of the seminar; Content of the seminar; Meaning and utility of a team-centered design for TQM training; Results of the seminar; Use that one KSC contractor, EG&G Florida, Inc. has made of the seminar in its Total Quality Management initiative; and Lessons learned.

  5. Contractor Selection in Saudi Arabia

    OpenAIRE

    M. A. Bajaber; M. A. Taha

    2012-01-01

    Contractor selection in Saudi Arabia is very important due to the large construction boom and the contractor role to get over construction risks. The need for investigating contractor selection is due to the following reasons; large number of defaulted or failed projects (18%), large number of disputes attributed to contractor during the project execution stage (almost twofold), the extension of the General Agreement on Tariffs and Trade (GATT) into construction industry, and finally the few ...

  6. 75 FR 2463 - Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers...

    Science.gov (United States)

    2010-01-15

    ... be considered a breach of contract and shall not entitle the Contractor to a price adjustment under... constitute a breach of this contract and shall not entitle the Contractor to any price adjustment under the... Continuing Contract for Civil Works Project Managed by the United States Army Corps of Engineers Clauses...

  7. Project Management Methodology in Human Resource Management

    Science.gov (United States)

    Josler, Cheryl; Burger, James

    2005-01-01

    When charged with overseeing a project, how can one ensure that the project will be completed on time, within budget, and to the satisfaction of everyone involved? In this article, the authors examine project management methodology as a means of ensuring that projects are conducted in a disciplined, well-managed and consistent manner that serves…

  8. Reengineering and health physics within the project Hanford management contract

    International Nuclear Information System (INIS)

    Atencio, E.M.

    1997-01-01

    The impending transition of the Hartford Site management and operations (M ampersand O) contract to a management and integrating (M ampersand I) contract format, together with weak radiological performance assessments by external organizations and reduced financial budgets prompted the 're-engineering' of the previous Hanford prime contractor Radiological Control (Rad Con) organization. This paper presents the methodology, identified areas of improvements, and results of the re-engineering process. The conversion from the M ampersand O to the M ampersand I contract concept resulted in multiple independent Rad Con organizations reporting to separate major contractors who are managed by an integrating contractor. This brought significant challenges when establishing minimum site standards for sitewide consistency, developing roles and responsibilities, and maintaining site Rad Con goals. Championed by the previous contractor's Rad Con Director, Denny Newland, a five month planning effort was executed to address the challenges of the M ampersand I and to address identified weaknesses. Fluor Daniel Hanford assumed the responsibility as integrator of the Project Hanford Management Contract on October 1, 1996. The Fluor Daniel Hanford Radiation Protection Director Jeff Foster presents the results of the re-engineering effort, including the significant cost savings, process improvements, field support improvements, and clarification of roles and responsibilities that have been achieved

  9. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    Science.gov (United States)

    Alagba, Tonye J.

    Oil and gas drilling projects are the primary means by which oil companies recover large volumes of commercially available hydrocarbons from deep reservoirs. These types of projects are complex in nature, involving management of multiple stakeholder interfaces, multidisciplinary personnel, complex contractor relationships, and turbulent environmental and market conditions, necessitating the application of proven project management best practices and critical success factors (CSFs) to achieve success. Although there is some practitioner oriented literature on project management CSFs for drilling projects, none of these is based on empirical evidence, from research. In addition, the literature has reported alarming rates of oil and gas drilling project failure, which is attributable not to technical factors, but to failure of project management. The aim of this quantitative correlational study therefore, was to discover an empirically verified list of project management CSFs, which consistent application leads to successful implementation of oil and gas drilling projects. The study collected survey data online, from a random sample of 127 oil and gas drilling personnel who were members of LinkedIn's online community "Drilling Supervisors, Managers, and Engineers". The results of the study indicated that 10 project management factors are individually related to project success of oil and gas drilling projects. These 10 CSFs are namely; Project mission, Top management support, Project schedule/plan, Client consultation, Personnel, Technical tasks, Client acceptance, Monitoring and feedback, Communication, and Troubleshooting. In addition, the study found that the relationships between the 10 CSFs and drilling project success is unaffected by participant and project demographics---role of project personnel, and project location. The significance of these findings are both practical, and theoretical. Practically, application of an empirically verified CSFs list to oil

  10. Environmental restoration contractor facility safety plan -- MO-561 100-D site remediation project

    International Nuclear Information System (INIS)

    Donahoe, R.L.

    1996-11-01

    This safety plan is applicable to Environmental Restoration Contractor personnel who are permanently assigned to MO-561 or regularly work in the facility. The MO-561 Facility is located in the 100-D Area at the Hanford Site in Richland, Washington. This plan will: (a) identify hazards potentially to be encountered by occupants of MO-561; (b) provide requirements and safeguards to ensure personnel safety and regulatory compliance; (c) provide information and actions necessary for proper emergency response

  11. Project management and Enterprise systems

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2006-01-01

    Implementing and Operating integrated Enterprise Systems are a multidimensional effort. It seriously challenges the IT supplier as well as the professional service provider client. The paper discuss these issues in a project management perspective. A framework for supporting project management...

  12. Agile Project Management For Dummies

    CERN Document Server

    Layton, Mark C

    2012-01-01

    Be flexible and faster with Agile project management As mobile and web technologies continue to evolve rapidly, there is added pressure to develop and implement software projects in weeks instead of months. Agile Project Management For Dummies can make that happen. This is the first book to provide a simple, step-by-step guide to Agile Project Management approaches, tools, and techniques. With the fast pace of mobile and web technology development, software project development must keep pace; Agile Project Management enables developers to complete and implement projects more quickly and this b

  13. CONTEMPORARY TRENDS IN PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Ana Argirova

    2015-09-01

    Full Text Available The modern information society in ever increasing business projects and time limits to achieve the objectives at minimum cost leads to a search for ways to manage them. Today, more and more managers use IT tools for project management, and the term itself is associated with software solutions for the optimization and management of projects in different fields of human activity. The paper examines the main characteristics of project management by means of information technology. Key tasks and processes in the project implementation and management are discussed.

  14. 48 CFR 970.2703-2 - Patent rights clause provisions for management and operating contractors.

    Science.gov (United States)

    2010-10-01

    ...-by-case basis. If the time period expired due to negligence by the contractor, DOE may grant a... to avoid such negligence in the future. If a contractor is requesting an extension of time in which... Law 101-189, section 3133(d), and the DOE owned facility is involved in weapons related research and...

  15. Key aspects in managing safety when working with multiple contractors: A case study

    NARCIS (Netherlands)

    Drupsteen, L.; Rasmussen, H.B.; Ustailieva, E.; Kampen, J. van

    2015-01-01

    Working with multiple contractors in a shared workplace can introduce and increase safety risks due to complexity. The aim of this study was to explore how safety issues are recognized in a specific case and to identify whether clients and contractors perceive problems similarly. The safety issues

  16. Knowledge exchange and learning from failures in distributed environments: The role of contractor relationship management and work characteristics

    International Nuclear Information System (INIS)

    Gressgård, Leif Jarle; Hansen, Kåre

    2015-01-01

    Learning from failures is vital for improvement of safety performance, reliability, and resilience in organizations. In order for such learning to take place in distributed environments, knowledge has to be shared among organizational members at different locations and units. This paper reports on a study conducted in the context of drilling and well operations on the Norwegian Continental Shelf, which represents a high-risk distributed organizational environment. The study investigates the relationships between organizations' abilities to learn from failures, knowledge exchange within and between organizational units, quality of contractor relationship management, and work characteristics. The results show that knowledge exchange between units is the most important predictor of perceived ability to learn from failures. Contractor relationship management, leadership involvement, role clarity, and empowerment are also important factors for failure-based learning, both directly and through increased knowledge exchange. The results of the study enhance our understanding of how abilities to learn from failures can be improved in distributed environments where similar work processes take place at different locations and involve employees from several companies. Theoretical contributions and practical implications are discussed. - Highlights: • We investigate factors affecting failure-based learning in distributed environments. • Knowledge exchange between units is the most important predictor. • Contractor relationship management is positively related to knowledge exchange. • Leadership involvement, role clarity, and empowerment are significant variables. • Respondents from an operator firm and eight contractors are included in the study

  17. Project Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the ''Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs

  18. Nurse managers' challenges in project management.

    Science.gov (United States)

    Suhonen, Marjo; Paasivaara, Leena

    2011-11-01

    To analyse the challenges that nurse managers meet in project management. Project management done by nurse managers has a significant role in the success of projects conducted in work units. The data were collected by open interviews (n = 14). The participants were nurse managers, nurses and public health nurses. Data analysis was carried out using qualitative content analysis. The three main challenges nurse managers faced in project management in health-care work units were: (1) apathetic organization and management, (2) paralysed work community and (3) cooperation between individuals being discouraged. Nurse managers' challenges in project management can be viewed from the perspective of the following paradoxes: (1) keeping up projects-ensuring patient care, (2) enthusiastic management-effective management of daily work and (3) supporting the work of a multiprofessional team-leadership of individual employees. It is important for nurse managers to learn to relate these paradoxes to one another in a positive way. Further research is needed, focusing on nurse managers' ability to promote workplace spirituality, nurse managers' emotional intelligence and their enthusiasm in small projects. © 2011 Blackwell Publishing Ltd.

  19. Project and Sports Events Management

    OpenAIRE

    Sebastian Madalin MUNTEANU

    2011-01-01

    This paper tries to capture the importance it holds the project management in socio-cultural sector which stands out when we refer to the sport. So when we talk about project management in sport, to consider a much larger vision, a new project management perspective, they involve a responsibility for the implementation of an event with global impact on very long term. Sports projects, as history shows us, played a significant role in developing societies. Also, all major sports industry proje...

  20. Project Portfolio Management Applications Testing

    OpenAIRE

    Paul POCATILU

    2006-01-01

    Many IT companies are running project simultaneously. In order to achieve the best results, they have to group to the project in portfolios, and to use specific software that helps to manage them. Project portfolio management applications have a high degree of complexity and they are very important for the companies that are using it. This paper focuses on some characteristics of the testing process for project portfolio management applications

  1. Project Portfolio Management Applications Testing

    Directory of Open Access Journals (Sweden)

    Paul POCATILU

    2006-01-01

    Full Text Available Many IT companies are running project simultaneously. In order to achieve the best results, they have to group to the project in portfolios, and to use specific software that helps to manage them. Project portfolio management applications have a high degree of complexity and they are very important for the companies that are using it. This paper focuses on some characteristics of the testing process for project portfolio management applications

  2. Rethinking Project Management in Denmark

    DEFF Research Database (Denmark)

    Svejvig, Per

    2012-01-01

    . The chapter argues for a rethinking process due to pervasiveness and complexity in the contemporary project environment where rethinking is needed in order to stay competitive. The suggested approach for the rethinking project management is a framing process where body of ideas is established......Projects are everywhere across different sectors, industries and countries. Project management is no longer a sub-discipline of engineering and other rather technical disciplines but is also used for many other purposes. Even though practice has changed dramatically over the years, the models...... and methodologies for project management has been fairly static and has therefore received substantial criticism for a lack of relevance to practice. Several scholars have therefore started to think more widely about projects and project management conceptualized as rethinking project management. However this theme...

  3. Management of research and development project

    International Nuclear Information System (INIS)

    Go, Seok Hwa; Hong Jeong Yu; Hyun, Byeong Hwan

    2010-12-01

    This book introduces summary on management of research and development project, prepare of research and development with investigation and analysis of paper, patent and trend of technology, structure of project, management model, management of project, management of project range, management of project time, management of project cost, management of project goods, management of project manpower, management of communication, management of project risk, management of project supply, management of outcome of R and D, management of apply and enroll of patent and management of technology transfer.

  4. Project Management in Higher Education

    Science.gov (United States)

    Alpert, Shannon Atkinson

    2011-01-01

    This study identified factors that influenced the use of project management in higher education research projects. Using a qualitative grounded theory approach that included in-depth interviews with assistant professors, the researcher examined how these individuals were using project management processes and tools and factors that enabled,…

  5. Conceptions of Software Development by Project Managers: A Study of Managing the Outsourced Development of Software Applications for United States Federal Government Agencies

    Science.gov (United States)

    Eisen, Daniel

    2013-01-01

    This study explores how project managers, working for private federal IT contractors, experience and understand managing the development of software applications for U.S. federal government agencies. Very little is known about how they manage their projects in this challenging environment. Software development is a complex task and only grows in…

  6. Comprehensive management of project changes

    Directory of Open Access Journals (Sweden)

    Aljaž Stare

    2010-06-01

    Full Text Available The goal of this research was to examine how project changes can be prevented, and how to reduce their negative impact. Theoretical research examined risk management, project control and change management. Based on the study a “Comprehensive Change Management Model” was developed and verified after conducting empirical research in Slovenian enterprises. The research confirmed that risk management identifies possible changes and reduces their impact; project control ensures the timely detection of changes and an efficient response, while formal change management ensures the effective implementation of changes. The combined functioning of all three areas ensures effective project execution.

  7. Risk management in nuclear projects

    International Nuclear Information System (INIS)

    Salles, Claudio J.R.

    2002-01-01

    The risk management will be defined by different aspects: danger or loss possibility, or responsibility for damage. The risk management is one stage of project management. The risk management is a continuous process of planning, identification, quantification, answer and risk control to maximize the success potential of activity. The reduction of risk is part of priority establishment. This work will indicate how introduce this important instrument in the management of nuclear projects. (author)

  8. Project management in building industry management

    Directory of Open Access Journals (Sweden)

    Martin Nový

    2012-01-01

    Full Text Available The article deals with contents of the project management on general level first. It mentions the most widespread project management standards, which have historically developed in global scale, their parts and objectives. Further, it describes position of the building industry in national economy, its specific features distinguishing it from the other industrial production, contents of the building industry management and project management of structures. The importance of the role of project manager is documented by characteristics of construction projects, their course, contents of sub-phases, and individual types of managing activities. Attention is devoted to project planning – determination of realization costs, necessary resources, sequence and time course of individual works. The most frequently used graphic methods of schedule presentation – Gantt chart, network chart and frequency bar chart are applied on examples of constructions. These charts can be focused in time sequence on individual types of resources – workforce, finance, materials, energies, and machinery. In conclusion, necessity to manage the project management procedures is emphasized as a part of skills of a construction engineer in the role of preparation manager or construction project realization manager.

  9. A Management Case Analysis of the Department of Defense Contractor Risk Assessment Guide Program

    Science.gov (United States)

    1990-12-01

    ORGANIZATION ......... 17 1. Past Government Organization Problems... 17 2. Current Government Organization ......... 17 3. The Contractor’s Organizatin ...Program and urged CODSIA to take a leadership role in encouraging its members to participate. The DCAA [Ref ll:p. 45] informed defense contractors in...conferences, and through the leadership of officials including the Under Secretary of the Navy for Acquisition, DOD Comptroller General, DOD Inspector General

  10. Global Project Management: Graduate Course

    National Research Council Canada - National Science Library

    Beranek, Thomas R

    2006-01-01

    ..., A. James Clark School of Engineering - Project Management Program. The course slides and suggested readings provide a general exploration of the nuances of doing projects globally as compared to domestically...

  11. Efficient and Effective Project Management

    Directory of Open Access Journals (Sweden)

    Dusan Pene

    2014-03-01

    Full Text Available The purpose of the article is to investigate different authorities and responsibilities of a project manager and of a project leader. Considering the fact that nowadays the project management is becoming the important factor in performing and leading the investments which are modified by modern leadership theories, we can say that the key element is the sovereign leadership of a manager and a project leader. The current multi-project environments and modern techniques at the project management area need the interdisciplinary leadership approach and at the same time they enable the strengthening of company’s competitive features so they are consistently satisfying high project expectations of the project investor or a client.

  12. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE`s Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES&H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report.

  13. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    International Nuclear Information System (INIS)

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE's Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES ampersand H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report

  14. Energy Management in Small Commercial Buildings: A Look at How HVAC Contractors Can Deliver Energy Efficiency to this Segment

    Energy Technology Data Exchange (ETDEWEB)

    Hult, Erin; Granderson, Jessica; Mathew, Paul

    2014-07-01

    While buildings smaller than 50,000 sq ft account for nearly half of the energy used in US commercial buildings, energy efficiency programs to-date have primarily focused on larger buildings. Interviews with stakeholders and a review of the literature indicate interest in energy efficiency from the small commercial building sector, provided solutions are simple and low-cost. An approach to deliver energy management to small commercial buildings via HVAC contractors and preliminary demonstration findings are presented. The energy management package (EMP) developed includes five technical elements: benchmarking and analysis of monthly energy use; analysis of interval electricity data (if available), a one-hour onsite walkthrough, communication with the building owner, and checking of results. This data-driven approach tracks performance and identifies low-cost opportunities, using guidelines and worksheets for each element to streamline the delivery process and minimize the formal training required. This energy management approach is unique from, but often complementary to conventional quality maintenance or retrofit-focused programs targeting the small commercial segment. Because HVAC contractors already serve these clients, the transaction cost to market and deliver energy management services can be reduced to the order of hundreds of dollars per year. This business model, outlined briefly in this report, enables the offering to benefit the contractor and client even at the modest expected energy savings in small buildings. Results from a small-scale pilot of this approach validated that the EMP could be delivered by contractors in 4-8 hours per building per year, and that energy savings of 3-5percent are feasible through this approach.

  15. Risk Management System and Project Staff Education Program for Overseas Construction Project Using the Expert System

    OpenAIRE

    Hirota, Yoichi

    2007-01-01

    The turnover of the Japanese contractors and the consulting firms has kept the same level since 1983, in spite of the fact that the size of domestic market is shrinking. This is why they do not have a proper management system, especially risk management system for the overseas construction projects. This study aims at building risk management system and developing education program that can be applied to reinforcing the ability, based on the author’s experience. Risk is defined as “uncertain ...

  16. From Project Management to Process Management - Effectively Organising Transdisciplinary Projects

    OpenAIRE

    Moschitz, Heidrun

    2013-01-01

    In transdisciplinary projects, the roles of researchers change. In addition to being a source of knowledge, they are required to engage in knowledge exchange processes. This results in an alteration at project level: researchers need to creatively manage projects as group processes.

  17. The Environmental Management Project Manager's Handbook for improved project definition

    International Nuclear Information System (INIS)

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook

  18. Mobile Project Management

    Directory of Open Access Journals (Sweden)

    Catalin BOJA

    2006-01-01

    Full Text Available Based on the development of new communication and data transfer technologies, the mobile solutions for the management process have been able to provide new ways to conduct management actions. This environment describes methods and tools available only here, which will bring information, speed and efficiency to any stage and component of the management process. The paper takes into discussion the impact of the technological development on the management process paradigm. The paper presents the main aspects regarding the business and management models used in mobile management. The role of mobile multimedia informatics applications in mobile management is highlighted.

  19. Making sense of project management

    DEFF Research Database (Denmark)

    Kjærgaard, Annemette; Kautz, Karl; Nielsen, Peter Axel

    2007-01-01

    How can a software company make sense of project management when it becomes involved in software process improvement? In software development most research has an instrumental view of knowledge management thus neglecting what is probably the most important part of knowledge management namely making...... sense of practice by developers and project managers. Through an action case, we study the knowledge management processes in a Danish software company. We analyse the case through the lens of a theoretical framework. The theoretical framework focuses in particular on sensemaking, collective construed...... substantial insight which could not have been achieved through an instrumental perspective on knowledge management....

  20. Contractor safety

    International Nuclear Information System (INIS)

    Blanton, M.L.; Montgomery, E.W.

    1991-01-01

    The recent trend in the United States and Shell Oil Company EandP has been to increase use of contractors to do specialized work. Many companies now use contractors almost exclusively for operations such as drilling, well workovers, construction, and many specialty and routine maintenance tasks. Today, approximately 75% of Shell Oil Company's actual operating work force in EandP is contract. Clearly, HSandE considerations must become an increasingly important part of the contractor selection process. This paper reports on the Shell Oil Company's evolution from a bidder selection process to a program of Matching Owner and Contractor. Well has begun to expand efforts to make better assessments of contractor's HSandE capabilities and values in pre-bid considerations. Focus is on pre-bid evaluations to select contractors that have strong HSandE commitments and values. Contractor safety performance in this industry must be brought up to the same standards as operating companies. In Shell Oil EandP is only willing to contractors who can and are willing to do that

  1. Project Management Personnel Competencies Evaluation

    Directory of Open Access Journals (Sweden)

    Paul POCATILU

    2006-01-01

    Full Text Available An important factor for the success management of IT projects is the human resource. People involved in the project management process have to be evaluated. In order to do that, same criteria has to be specified. This paper describes some aspects regarding the personnel evaluation.

  2. Application of Project Portfolio Management

    Science.gov (United States)

    Pankowska, Malgorzata

    The main goal of the chapter is the presentation of the application project portfolio management approach to support development of e-Municipality and public administration information systems. The models of how people publish and utilize information on the web have been transformed continually. Instead of simply viewing on static web pages, users publish their own content through blogs and photo- and video-sharing slides. Analysed in this chapter, ICT (Information Communication Technology) projects for municipalities cover the mixture of the static web pages, e-Government information systems, and Wikis. So, for the management of the ICT projects' mixtures the portfolio project management approach is proposed.

  3. 6 Project-Management Tips

    Science.gov (United States)

    Demski, Jennifer

    2012-01-01

    When it comes to project management, the IT department is typically its own worst enemy. When project requests are pushed through the budgeting process by different departments, it's up to IT to make them all work. The staff is required to be "heroic" to get the project load done. People get to work over weekends and postpone their vacations. The…

  4. Municipal solid waste management: A bibliography of U.S. Department of Energy contractor reports through 1995

    International Nuclear Information System (INIS)

    NONE

    1997-01-01

    This bibliography is an updated version of Municipal Solid Waste Management: A Bibliography of US Department of Energy Contractor Reports Through 1994 (NREL/TP-430-7886). The original bibliography, entitled Municipal Waste to Energy: An Annotated Bibliography of US Department of Energy Contractor Reports, by Caroline Brooks, was published in 1987. Like its predecessor, this bibliography provides information about technical reports on energy from municipal waste that were prepared under grants or contracts from the US Department of Energy. The reports listed focus on energy from municipal waste technologies and energy conservation in wastewater treatment. The bibliography contains three indexes-an author index, a subject index, and a title index. The reports are listed alphabetically in the subject areas and may appear under more than one subject. All of the reports cited in the original MSW bibliography are also included in this update

  5. Municipal solid waste management: A bibliography of U.S. Department of Energy contractor reports through 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    This bibliography is an updated version of Municipal Solid Waste Management: A Bibliography of US Department of Energy Contractor Reports Through 1994 (NREL/TP-430-7886). The original bibliography, entitled Municipal Waste to Energy: An Annotated Bibliography of US Department of Energy Contractor Reports, by Caroline Brooks, was published in 1987. Like its predecessor, this bibliography provides information about technical reports on energy from municipal waste that were prepared under grants or contracts from the US Department of Energy. The reports listed focus on energy from municipal waste technologies and energy conservation in wastewater treatment. The bibliography contains three indexes--an author index, a subject index, and a title index. The reports are listed alphabetically in the subject areas and may appear under more than one subject. All of the reports cited in the original MSW bibliography are also included in this update.

  6. Operations Strategy Development in Project-based Production – a building contractor implements Lean

    DEFF Research Database (Denmark)

    Koch, Christian; Friis, Ole Uhrskov

    2015-01-01

    Purpose: To study how operations strategy innovation occurs in project-based production and organisation. Design/methodology/approach: A longitudinal case study encompassing the processes at the company headquarters and in two projects using Lean. Findings: The operations strategy development com...

  7. Managing regional innovation strategy projects

    OpenAIRE

    Wolf, Patricia; Hanisch, Christoph

    2014-01-01

    This paper presents a qualitative interview study with 28 RIS project managers that aimed at understanding whether or not this is true in the context of regional innovation and what the specifics of managing regional innovation projects are. In taking up a recent claim for policy intervention studies which allow to “derive precise suggestions for their design and management”.  The study investigated the interrelation between the agility of the management approach and the achievements of RIS p...

  8. Methodologies used in Project Management

    OpenAIRE

    UNGUREANU, Adrian; UNGUREANU, Anca

    2014-01-01

    Undoubtedly, a methodology properly defined and strictly followed for project management provides a firm guarantee that the work will be done on time, in budget and according to specifications. A project management methodology in simple terms is a “must-have” to avoid failure and reduce risks, because is one of the critical success factors, such basic skills of the management team. This is the simple way to guide the team through the design and execution phases, processes and tasks throughout...

  9. EDUCATIONAL PROJECTS STAKEHOLDER MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Юлія Юріївна ГУСЄВА

    2016-02-01

    Full Text Available An approach based on an integration of requirements breakdown structure and work breakdown structure of the project is proposed. It can complement existing methods of project stakeholders classification with the indicator of resource input, which can be defined in monetary terms. A method of requirements monitoring is proposed, which allows you to track the requirements of project stakeholders over time according to the actual amount of resources spent by analogy with the earned value method. Proposed indexes are the basis not only for monitoring but for the forecast of the project. The need of creating of a mechanism for getting baseline data taking into account the existence of different types of requirements of project stakeholders is grounded.

  10. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  11. Information management for decommissioning projects

    International Nuclear Information System (INIS)

    LeClair, A.N.; Lemire, D.S.

    2011-01-01

    This paper explores the importance of records and information management for decommissioning projects. Key decommissioning information and elements of a sound information management strategy are identified. Various knowledge management strategies and tools are discussed as opportunities for leveraging decommissioning information. The paper also examines the implementation of Atomic Energy of Canada Limited's (AECL) strategy for the long term preservation of decommissioning information, and its initiatives in leveraging of information with the application of several knowledge management strategies and tools. The implementation of AECL's strategy illustrates common as well as unique information and knowledge management challenges and opportunities for decommissioning projects. (author)

  12. 48 CFR 46.105 - Contractor responsibilities.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor... CONTRACT MANAGEMENT QUALITY ASSURANCE General 46.105 Contractor responsibilities. (a) The contractor is..., and furnishing such information to the Government as required. (b) The contractor may be required to...

  13. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  14. Project Management Plan Solution Stabilization

    International Nuclear Information System (INIS)

    SATO, P.K.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process

  15. HBR guide to project management

    CERN Document Server

    Harvard Business Review

    2013-01-01

    MEET YOUR GOALS—ON TIME AND ON BUDGET. How do you rein in the scope of your project when you’ve got a group of demanding stakeholders breathing down your neck? And map out a schedule everyone can stick to? And motivate team members who have competing demands on their time and attention? Whether you’re managing your first project or just tired of improvising, this guide will give you the tools and confidence you need to define smart goals, meet them, and capture lessons learned so future projects go even more smoothly. The HBR Guide to Project Management will help you: • Build a strong, focused team • Break major objectives into manageable tasks • Create a schedule that keeps all the moving parts under control • Monitor progress toward your goals • Manage stakeholders’ expectations • Wrap up your project and gauge its success

  16. Managing a project's legacy: implications for organizations and project management

    Science.gov (United States)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  17. PROJECT APPROACH TO ENERGY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Інга Борисівна СЕМКО

    2016-02-01

    Full Text Available Project management is widely used around the world as a tool to improve business performance. Correct implementation of the program of implementation of energy efficiency is accompanied by the adoption of an appropriate legislative framework, support programs, the approval of market-based instruments. Currently, it is paying enough attention to the effective application of market-based instruments, although most of the activities in the field of energy efficiency from the economic side are quite profitable. The authors suggested the use of the methodology of project management to the management of energy-saving measures, new approaches to the place and role of project management in the hierarchy of guidance. As a result, this innovation can improve the competitiveness of enterprises. The conclusions that the energy-saving project management allows you to get the best results for their implementation by reducing the time, resources, risk reduction.

  18. Agile Project Management with Scrum

    CERN Document Server

    Schwaber, Ken

    2009-01-01

    The rules and practices for Scrum-a simple process for managing complex projects-are few, straightforward, and easy to learn. But Scrum's simplicity itself-its lack of prescription-can be disarming, and new practitioners often find themselves reverting to old project management habits and tools and yielding lesser results. In this illuminating series of case studies, Scrum co-creator and evangelist Ken Schwaber identifies the real-world lessons-the successes and failures-culled from his years of experience coaching companies in agile project management. Through them, you'll understand how to

  19. PROJECT MANAGER SKILLS, RISK MANAGEMENT TOOLS

    Directory of Open Access Journals (Sweden)

    Vladut Iacob

    2013-12-01

    Full Text Available Although the projects are different from each other there are many common things that contribute to their success. Looked overall, the success of a project is the result of a multitude of factors. This person is considered the "engine" of the project. The man who makes the action set for the achievement of project objectives to be brought to an end. The project manager must have the technical knowledge and economic diverse. He should be able to choose a team and lead. You must be tenacious, combative, to know how to communicate both within the team and beyond. In a word, the project manager must have an impressive stock of knowledge, skills and abilities and appreciate as Peter Drucker, to "exist for the organization. To be its servant. Any management who forget this will only cause damage to the organization. "This study will focus on highlighting the skills of the project manager and their role in managing difficult situations or risk.

  20. Ranking the Project Management Success Factors for Construction Project in South India

    Science.gov (United States)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  1. Project Management Approach to Transition of the Miamisburg Closure Project From Environmental Cleanup to Post-Closure Operations

    International Nuclear Information System (INIS)

    Carpenter, C.P.; Marks, M.L.; Smiley, S.L.; Gallaher, D.M.; Williams, K.D.

    2006-01-01

    The U.S. Department of Energy (DOE) used a project management approach to transition the Miamisburg Closure Project from cleanup by the Office of Environmental Management (EM) to post-closure operations by the Office of Legacy Management (LM). Two primary DOE orders were used to guide the site transition: DOE Order 430.1B, Real Property Asset Management, for assessment and disposition of real property assets and DOE Order 413.3, Program and Project Management for Acquisition of Capital Assets, for project closeout of environmental cleanup activities and project transition of post-closure activities. To effectively manage these multiple policy requirements, DOE chose to manage the Miamisburg Closure Project as a project under a cross-member transitional team using representatives from four principal organizations: DOE-LM, the LM contractor S.M. Stoller Corporation, DOE-EM, and the EM contractor CH2M Hill Mound Inc. The mission of LM is to manage the Department's post-transition responsibilities and long-term care of legacy liabilities and to ensure the future protection of human health and the environment for cleanup sites after the EM has completed its cleanup activities. (authors)

  2. WIPP Project Records Management Handbook

    International Nuclear Information System (INIS)

    1991-01-01

    The Waste Isolation Pilot Plant (WIPP) Records Management Handbook provides the WIPP Project Records Management personnel with a tool to use to fulfill the requirements of the WIPP Records Program and direct their actions in the important area of records management. The handbook describes the various project areas involved in records management, and how they function. The handbook provides the requirements for Record Coordinators and Master Record Center (MRC) personnel to follow in the normal course of file management, records scheduling, records turnover, records disposition, and records retrieval. More importantly, the handbook provides a single reference which encompasses the procedures set fourth in DOE Order 1324.2A, ''Records Disposition'' ASME NQA-1, ''Quality Assurance Program Requirements for Nuclear Facilities'' and DOE-AL 5700.6B, ''General Operations Quality Assurance.'' These documents dictate how an efficient system of records management will be achieved on the WIPP Project

  3. Quality assurance project plan for the UMTRA technical assistance contractor hydrochemistry facility. Final report

    International Nuclear Information System (INIS)

    1993-07-01

    The Uranium Mill Tailings Remedial Action (UMTRA) hydrochemistry facility is used to perform a limited but important set of services for the UMTRA Project. Routine services include support of field-based hydrological and geochemical operations and water sampling activities. Less commonly, the hydrology and geochemistry staff undertake special studies and site characterization studies at this facility. It is also used to train hydrologists, geochemists, and groundwater sampling crews. A review of this Quality Assurance Project Plan (QAPP) shall be accomplished once each calendar year. This review will be targeted to be accomplished not sooner than 6 months and not later than 18 months after the last review

  4. 48 CFR 970.4402 - Contractor purchasing system.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Management and Operating Contractor Purchasing 970.4402 Contractor purchasing system. ...

  5. Agile project management managing for success

    CERN Document Server

    Crowder, James A

    2015-01-01

    Management and enables them to deal with the demands and complexities of modern, agile systems/software/hardware development teams. The book examines the project/program manager beyond the concepts of leadership and aims to connect to employees' sense of identity. The text examines human psychological concepts such as "locus of control," which will help the manager understand their team members' view and how best to manage their "world" contributions. The authors cover new management tools and philosophies for agile systems/software/hardware development teams, with a specific focus on how this

  6. Project Management Consultancy (PMC) procurement approach: Supplier's evaluation and selection dilemma

    Science.gov (United States)

    Nawi, Mohd Nasrun Mohd; Azimi, Mohd Azrulfitri; Pozin, Mohd Affendi Ahmad; Osman, Wan Nadri; Anuar, Herman Shah

    2016-08-01

    Project Management Consultancy (PMC) is part of the management oriented procurement method in which a sole consultant is hired by the client to deal with the contactors in place of the client. Appointing contractors in this method or approach looks to be interesting as client could play a pivotal role in evaluating and selecting the supplier/contractor for the work package. In some cases, client gives the authority for the PMC to hire the supplier/contractor of their choice while in some cases the client is the one who made the decision. This research paper seeks to investigate the dilemma arises from this situation and for the purpose of this research, a real case study was studied to assess the impacts of such dilemma to the performance of the project. Recommendations on how to tackle the dilemma will also be addressed in the later part of this research paper.

  7. Knowledge Model: Project Knowledge Management

    DEFF Research Database (Denmark)

    Durao, Frederico; Dolog, Peter; Grolin, Daniel

    2009-01-01

    The Knowledge model for project management serves several goals:Introducing relevant concepts of project management area for software development (Section 1). Reviewing and understanding the real case requirements from the industrial perspective. (Section 2). Giving some preliminary suggestions...... for usage in KIWI system (Sections 3). This document is intended for technological partners to understand how for example the software development concepts can be applied to a semantic wiki framework....

  8. Towards rethinking Project portfolio management

    DEFF Research Database (Denmark)

    Hansen, Lars Kristian; Svejvig, Per

    the last five years. Utilizing the theoretical lens proposed by Svejvig and Andersen (2015), we apply two complementary analytical perspectives to classify and analyze the stocks. One perspective, denoted as classical project management (CPM), highlights key characteristics of conventional research....... A second perspective, denoted as rethinking project management (RPM), highlights characteristics of progressive research. Not surprisingly, characteristics from CPM are very dominant in the stock of most cited publications of all years — instrumentality and controllability in particular. In the newest...

  9. System Engineering Management and Implementation Plan for Project W-211, ''Initial Tank Retrieval Systems'' (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211

  10. System Engineering Management and Implementation Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    Energy Technology Data Exchange (ETDEWEB)

    VAN BEEK, J.E.

    2000-05-05

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211.

  11. RISK MANAGEMENT USING PROJECT RECON

    Science.gov (United States)

    2016-11-28

    centralized database . • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any...Create growth plans to proactively capture benefits • Customize reports to group opportunities by programmatic, technical, business, contracting, and

  12. Office of River Protection: Simplifying Project management tools

    International Nuclear Information System (INIS)

    TAYLOR, D.G.

    2000-01-01

    The primary approach to the effort was to form a multi-organizational team comprised of federal and contractor staff to develop and implement the necessary tools and systems to manage the project. In late 1999 the DOE Manager of the Office of River Protection formed the Project Integration Office to achieve the objective of managing the efforts as a single project. The first major task, and the foundation upon which to base the development of all other tools, was the establishment of a single baseline of activities. However, defining a single scope schedule and cost was a difficult matter indeed. Work scopes were available throughout the project, but the level of detail and the integration of the activities existed primarily between working groups and individuals and not on a project-wide basis. This creates a situation where technical needs, logic flaws, resource balancing, and other similar integration needs are not elevated for management attention and resolution. It should be noted that probably 90% of the interface issues were known and being addressed. The key is simplifying the process and providing tangible assurance that the other 10% does not contain issues that can delay the project. Fortunately all of the contractors employed a common scheduling tool, which served as the basis for first communicating and then integrating baseline activities. Utilizing a powerful computer-based scheduling tool, it was soon possible to integrate the various schedules after the following was accomplished: Establishment of a scheduling specification (standardized input, coding, and approach to logic); and Clearly defined project assumptions

  13. Management Of Building Projects

    OpenAIRE

    Niko Majdandzic; Tadija Lovric; Vido Peric

    2006-01-01

    In this work we have shown the concept of logistic support in management in building production and in building of objects, which is realised in Enterprise resource Planning – ERP system ERPINSG, developed in Informatic firm Informatic engineering – ININ in Slavonski Brod, and in cooperation with scientists of catedra for informatics of Faculty of Mechanical Engineering and users from building firms.

  14. 18-months fuel cycle engineering and its project management of the Daya Bay Nuclear Power Station

    International Nuclear Information System (INIS)

    Fu Xiangang; Jiao Ping; Liu Yong; Wu Zhiming

    2002-01-01

    The author introduces aspects related to the performing of 18-months fuel cycle engineering evaluation to the Daya Bay nuclear power plant, including the assessment on proposed technical solutions, appointment to the contractors, breaking down and implementation of project, experience on the project management and risk control, and etc. And it also briefs the prompting to the localization of the long fuel cycle engineering technology and AFA 3G fuel manufacturing and design technology via adequate technology transferring of this project

  15. Strategic Management of Large Projects

    Institute of Scientific and Technical Information of China (English)

    WangYingluo; LiuYi; LiYuan

    2004-01-01

    The strategic management of large projects is both theoretically and practically important. Some scholars have advanced flexible strategy theory in China. The difference of strategic flexibility and flexible strategy is pointed out. The supporting system and characteristics of flexible strategy are analyzed. The changes of flexible strategy and integration of strategic management are discussed.

  16. Project management in crisis situations

    Directory of Open Access Journals (Sweden)

    Agnieszka Goździewska-Nowicka

    2017-05-01

    Full Text Available In today’s methodologies of project management attention is increasingly paid to the crises-related issues. Modern economy and the turbulent environment cause that an emergingcrisis can pose a serious threat to the implementation of any undertaking. This article focuses on the presentation of the conditions and causes of crisis situations, the essence of projects, and their effective management. The major objective of the paper, however, is to demonstrate how companies implementing projects cope with the occurrence of a crisis situation.

  17. Document Management Projects: implementation guide

    OpenAIRE

    Beatriz Bagoin Guimarães

    2016-01-01

    Records Management System implementation is a complex process that needs to be executed by a multidisciplinary team and involves components of apparently non-related areas such as archival science, computer engineering, law, project management and human resource management. All of them are crucial and complementary to guarantee a full and functional implementation of a system and a perfect fusion with the connected processes and procedures. The purpose of this work is to provide organizations...

  18. Conflict Approaches of Effective Project Manager in the Upstream Sector of Indonesian Oil & Gas Industry

    Directory of Open Access Journals (Sweden)

    Adhi Cahyono

    2012-10-01

    Full Text Available Conflict can be functional or dysfunctional to the organization’s performance. This study focused on the relationship between conflict approaches implemented by the project manager based on project team member’s perception on the effectiveness of the project manager in managing project’s conflict. Questionnaires were modified from Barker et al. (1988 to measure conflict management approaches and outcomes of managing project conflict. Data were gathered from 57 respondents who worked in the Engineering, Procurement, and Construction (EPC contractors serving the upstream sector of the Oil and Gas industry in Indonesia. By using Pearson correlation, result of this study indicated that project managers were perceived to be effective in managing project conflict when implementing cooperative and confi rmative approaches, but ineffective when combining competitive and avoidance approaches. Further research should investigate correlation between cultural dimensions with conflict approaches and outcomes of managing conflict.

  19. Waste Management Project Contingency Analysis

    International Nuclear Information System (INIS)

    Edward L. Parsons, Jr.

    1999-01-01

    The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion

  20. Risk Management in Construction Project: Taking Fairness into Account

    Science.gov (United States)

    Górecki, Jarosław; Bizon-Górecka, Jadwiga

    2017-10-01

    Risk management requires a comprehensive review of possible hazards, their possible outcomes as well as some recommendations about minimizing the risk. The study emphasises that the project risk management refers to an analysis of the risk factors and a creation of the strategy minimising negative effects of the risk. It was pointed out that a construction project is this kind of projects that can be defined as a unique process of high complexity (design documentation, various stages of creating the building), which has clearly defined time frames and a given financial limit. It is executed as a team work, by qualified or highly qualified specialists of different matters, for example masonry, precast, etc. Additionally, it requires a use of modern equipment and an adequate preparation of the investment. Therefore, the risk management focuses on the problems allowing for troubleshooting. A basis of the risk management is to recognise the fundamentals, which are crucial for the construction project management, i.e. an object perspective, including technological, supporting and management processes as well as an entity perspective - project stakeholders. Construction projects require also an acquaintance with the specificity of the branch. The article refers to the risk management in construction project and, in particular, a phenomenon of participants’ fairness in such projects. The problem of fairness of the entities involved in a project should be understood as a fair play, according to the arrangements agreed in a contract and compatible with current formal procedures and social rules. It was indicated that fairness can be treated as an important factor in predicting the success of such projects. Interviews conducted among contractors in Kuyavian-Pomeranian region showed varied fairness requirements put to individual participants of construction projects. The article presents results of the research. It shows a desired attitude of the surveyed enterprises

  1. Status of Pantex Plant Waste Management Project/program control system

    International Nuclear Information System (INIS)

    Price, Wesley J.; Matthews, William L.

    1992-01-01

    During a December 1990 Waste Management Program Review held in Albuquerque, New Mexico, the Waste Management and Operational Surety Division (WMOSD) introduced the project control system to be used for the Waste Management (WM) Operations Program. The system was entitled 'TRAC-WM' (Tracking and Control for Waste Management). The stated objective for this system was to establish a frame work for planning, managing, and controlling work within the WM program. As a result Mason and Hanger (the operating contractor at the Pantex Plant) initiated the development of a computerized waste management project tracking system. (author)

  2. Document Management Projects: implementation guide

    Directory of Open Access Journals (Sweden)

    Beatriz Bagoin Guimarães

    2016-12-01

    Full Text Available Records Management System implementation is a complex process that needs to be executed by a multidisciplinary team and involves components of apparently non-related areas such as archival science, computer engineering, law, project management and human resource management. All of them are crucial and complementary to guarantee a full and functional implementation of a system and a perfect fusion with the connected processes and procedures. The purpose of this work is to provide organizations with a basic guide to Records Management Project implementation beginning with the steps prior to acquiring the system, following with the main project activities and concluding with the post implementation procedures of continuous improvement and system maintenance.

  3. Integrated project management type contracts

    International Nuclear Information System (INIS)

    Heisler, S.I.

    1975-01-01

    The concept of integrated project management represents a single source to which the owner can turn for all project management functions excepting for those relating to outside parties such as site purchase, personnel selection etc. Other functions such as design, procurement, construction management, schedule and cost control, quality assurance/quality control are usually handled by the integrated project manager as the agent of the owner. The arrangement is flexible and the responsibilities can be varied to suit the size and experience of the owner. Past experience in the United States indicates an increase in the trend toward IPM work and it appears that overseas this trend is developing also. (orig./RW) [de

  4. Planning and Managing Drupal Projects

    CERN Document Server

    Nordin, Dani

    2011-01-01

    If you're a solo website designer or part of a small team itching to build interesting projects with Drupal, this concise guide will get you started. Drupal's learning curve has thrown off many experienced designers, particularly the way it handles design challenges. This book shows you the lifecycle of a typical Drupal project, with emphasis on the early stages of site planning. Learn how to efficiently estimate and set up your own project, so you can focus on ways to make your vision a reality, rather than let project management details constantly distract you. Plan and estimate your projec

  5. Conceptualizing Knowledge Communication for Project Management

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    2015-01-01

    In the field of project management, the search for better ways to manage projects is ongoing. One of the more recent trends in the literature focuses on the integration of knowledge management in project management environments. Advantages of integrating knowledge management into projects can be ...... knowledge for project management, this paper focuses on extending Knowledge Management to include concepts related to communicating knowledge from the fields of rhetoric, knowledge communication, and corporate communication....

  6. Managing project risks and uncertainties

    Directory of Open Access Journals (Sweden)

    Mike Mentis

    2015-01-01

    Full Text Available This article considers threats to a project slipping on budget, schedule and fit-for-purpose. Threat is used here as the collective for risks (quantifiable bad things that can happen and uncertainties (poorly or not quantifiable bad possible events. Based on experience with projects in developing countries this review considers that (a project slippage is due to uncertainties rather than risks, (b while eventuation of some bad things is beyond control, managed execution and oversight are still the primary means to keeping within budget, on time and fit-for-purpose, (c improving project delivery is less about bigger and more complex and more about coordinated focus, effectiveness and developing thought-out heuristics, and (d projects take longer and cost more partly because threat identification is inaccurate, the scope of identified threats is too narrow, and the threat assessment product is not integrated into overall project decision-making and execution. Almost by definition, what is poorly known is likely to cause problems. Yet it is not just the unquantifiability and intangibility of uncertainties causing project slippage, but that they are insufficiently taken into account in project planning and execution that cause budget and time overruns. Improving project performance requires purpose-driven and managed deployment of scarce seasoned professionals. This can be aided with independent oversight by deeply experienced panelists who contribute technical insights and can potentially show that diligence is seen to be done.

  7. Multidisplinary Engineering, Project, and Production Management

    Directory of Open Access Journals (Sweden)

    Chien-Ho Ko

    2012-01-01

    Full Text Available Journal of Engineering, Project, and Production Management (EPPM-Journal reflect the journal’s multidisciplinary approach to management research and can be categorized as belonging to three general topics: Project Management, Engineering and Project Management, and Project and Production Management.

  8. 7 CFR 3565.351 - Project management.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  9. Multidisplinary Engineering, Project, and Production Management

    OpenAIRE

    Chien-Ho Ko

    2012-01-01

    Journal of Engineering, Project, and Production Management (EPPM-Journal) reflect the journal’s multidisciplinary approach to management research and can be categorized as belonging to three general topics: Project Management, Engineering and Project Management, and Project and Production Management.

  10. MANAGING LARGE INVESTMENT PROJECTS IN GORJ

    Directory of Open Access Journals (Sweden)

    CÎRNU DORU

    2016-12-01

    Full Text Available Currently, the concept of project management is considered to be the best concept for efficient management of a project, so it is used all over the world, and most recently in our country. This concept is designed with all the general characteristics of project management, but adapted to the large investment projects. This paper presents the project management concept and project management organization for capital projects. This concept is conceived with all general characteristics of project management, but adopted to the condition of large investment projects. The concept also includes the project team and the project manager, the person authorized and responsible for achieving the objectives planned in the project. For efficient managing by project, it is necessary to insure a good compozition of project team, as a team of people who, in collaboration with project manager, work directly on managing the project. To effectively manage the project, it is necessary to ensure a proper composition of the project team, a team of people who, in collaboration with the project manager to work directly for project management. It is a particularly good method of achieving the objectives planned projects, which means a project with a certain level of performance required in a planned time, with planned costs.

  11. A multilevel study of the impact of project manager's leadership on extra-role performance of project team members

    Science.gov (United States)

    Shokory, Suzyanty Mohd; Suradi, Nur Riza Mohd

    2018-04-01

    The current study examines the impact of transformational and transactional leadership of project manager on the extra-role performance of project team members. In addition, this study also identifies factor dominant to extra-role performance of project team members when the transformational and transactional leadership of project managers are analyzed simultaneously. The study involved 175 of project team members from 35 project teams (each project team consists of different contracting companies registered in the Selangor (N = 175 from 35 contractors company). A multilevel analysis with hierarchical linear modeling (HLM) approach was used in this study. The analysis showed that transformational and transactional leadership of the project manager is a positive significant with extra-role performance project team members when analyzed separately. However when the two constructs (transformational leadership and transactional leadership of project manager) were analyzed simultaneously, transformational leadership was found to have more impact on extra-role performance project team members compared to transactional leadership. These findings explained that although transformational and transactional leadership of project managers can improve extra-role performance project team members, but this study has proved that transformational leadership of project managers affect extra-role performance project team members more as compared to transactional leadership.

  12. Project cost estimation techniques used by most emerging building ...

    African Journals Online (AJOL)

    Keywords: Cost estimation, estimation methods, emerging contractors, tender. Dr Solly Matshonisa .... historical cost data (data from cost accounting records and/ ..... emerging contractors in tendering. Table 13: Use of project risk management versus responsibility: expected. Internal document analysis. Checklist analysis.

  13. Management of Software Development Projects

    Directory of Open Access Journals (Sweden)

    Felician ALECU

    2011-04-01

    Full Text Available Any major software development starts with the Initiating process group. Once the charter document is approved, the Planning and then to the Executing stages will follow. Monitoring and Controlling is measuring the potential performance deviation of the project in terms of schedule and costs and performs the related Integrated Change Control activities. At the end, during the Closing, the program/project manager will check the entire work is completed and the objectives are met.

  14. Project management plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2010-12-01

    The Dallas Integrated Corridor Management System Demonstration Project is a multi-agency, de-centralized operation which will utilize a set of regional systems to integrate the operations of the corridor. The purpose of the Dallas ICM System is to im...

  15. Project Management 2027; The Future of Project Management

    NARCIS (Netherlands)

    Drs. A.J.G. Silvius

    2008-01-01

    This paper describes a study into the expected development of the competences op the project manager in the year 2027. The study was performed amongst the members of IPMA-Netherlands during the summer of 2007. In the study the 46 competences of the International Competence Baseline 3 (ICB 3) were

  16. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  17. Project Management with IT Security Focus

    OpenAIRE

    Felician Alecu; Paul Pocatilu; Sergiu Capisizu

    2011-01-01

    The paper focus on the main key points related to the IT security project management. The most important lifecycle stages are identified: IT security project proposal definition, project organization, project planning, quality planning, project team organization, IT security project activities management and project closing. The most important success factors for IT security projects are the support of top-management, customer satisfaction, prevention over remediation and continuous progress....

  18. What is the role of a project or program manager in implementing and maintaining a quality assurance program

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    The task of managing a government-funded program has changed significantly from the days when a program manager managed the funds and depended on reports from a contractor to measure the program's progress. Today's manager of waste management program must be personally involved in every aspect of the program. The successful manager of a waste management program will lead the development of management controls to ensure successful accomplishment of project objectives. This paper describes the responsibilities of the project manager, the quality assurance staff and how they interface to develop and implement a quality assurance program for a waste management program

  19. Managing projects a team-based approach

    CERN Document Server

    Brown, Karen A

    2010-01-01

    Students today are likely to be assigned to project teams or to be project managers almost immediately in their first job. Managing Projects: A Team-Based Approach was written for a wide range of stakeholders, including project managers, project team members, support personnel, functional mangers who provide resources for projects, project customers (and customer representatives), project sponsors, project subcontractors, and anyone who plays a role in the project delivery process. The need for project management is on the rise as product life cycles compress, demand for IT systems increases, and business takes on an increasingly global character. This book adds to the project management knowledge base in a way that fills an unmet need—it shows how teams can apply many of the standard project management tools, as well as several tools that are relatively new to the field. Managing Projects: A Team-Based Approach offers the academic rigor found in most textbooks along with the practical attributes often foun...

  20. How Project Managers Really Manage: An Indepth Look at Some Managers of Large, Complex NASA Projects

    Science.gov (United States)

    Mulenburg, Gerald M.; Impaeilla, Cliff (Technical Monitor)

    2000-01-01

    This paper reports on a research study by the author that examined ten contemporary National Aeronautics and Space Administration (NASA) complex projects. In-depth interviews with the project managers of these projects provided qualitative data about the inner workings of the project and the methodologies used in establishing and managing the projects. The inclusion of a variety of space, aeronautics, and ground based projects from several different NASA research centers helped to reduce potential bias in the findings toward any one type of project, or technical discipline. The findings address the participants and their individual approaches. The discussion includes possible implications for project managers of other large, complex, projects.

  1. Software Tools Streamline Project Management

    Science.gov (United States)

    2009-01-01

    Three innovative software inventions from Ames Research Center (NETMARK, Program Management Tool, and Query-Based Document Management) are finding their way into NASA missions as well as industry applications. The first, NETMARK, is a program that enables integrated searching of data stored in a variety of databases and documents, meaning that users no longer have to look in several places for related information. NETMARK allows users to search and query information across all of these sources in one step. This cross-cutting capability in information analysis has exponentially reduced the amount of time needed to mine data from days or weeks to mere seconds. NETMARK has been used widely throughout NASA, enabling this automatic integration of information across many documents and databases. NASA projects that use NETMARK include the internal reporting system and project performance dashboard, Erasmus, NASA s enterprise management tool, which enhances organizational collaboration and information sharing through document routing and review; the Integrated Financial Management Program; International Space Station Knowledge Management; Mishap and Anomaly Information Reporting System; and management of the Mars Exploration Rovers. Approximately $1 billion worth of NASA s projects are currently managed using Program Management Tool (PMT), which is based on NETMARK. PMT is a comprehensive, Web-enabled application tool used to assist program and project managers within NASA enterprises in monitoring, disseminating, and tracking the progress of program and project milestones and other relevant resources. The PMT consists of an integrated knowledge repository built upon advanced enterprise-wide database integration techniques and the latest Web-enabled technologies. The current system is in a pilot operational mode allowing users to automatically manage, track, define, update, and view customizable milestone objectives and goals. The third software invention, Query

  2. A contractor report to the Department of Energy on environmental management baseline programs and integration opportunities (discussion draft)

    International Nuclear Information System (INIS)

    1997-05-01

    In July 1996, the US Department of Energy (DOE) Assistant Secretary for Environmental Management (EM) chartered a government contractor led effort to develop a suite of technically defensible, integrated alternatives which meet the EM mission. The contractor team was challenged to ''think outside-the-box'' for solutions that cross traditional site boundaries and enable the programs to get the job done at an earlier date and at a lower cost. This report documents baseline programs current plans for material disposition and presents the opportunities for additional acceleration of cleanup and cost savings. A graphical depiction of the disposition of EM-owned waste and material from current state to final disposition is shown as disposition maps in Attachments 1, 3, 5, 7, 9, and 11. These disposition maps detail the material disposition at eleven major DOE sites as planned in the current discussion draft plan, Accelerating Cleanup: Focus on 2006. Maps reflecting material disposition at additional sites will be added in the future. Opportunities to further accelerate the cleanup of DOE-EM sites and reduce the overall cost of cleanup are depicted in the alternative disposition maps shown in Attachments 2, 4, 6, 8, 10, and 12. These integration opportunities bring nation-wide resources to bear on common problems facing the DOE sites

  3. Contractor evaluations in the contractor selection process.

    Science.gov (United States)

    2014-04-01

    The current contractor evaluation system in use within the Kentucky Transportation Cabinet is based on the contractor evaluation system developed as part of SPR 212-00 "Quality Based Prequalification of Contractors." This system relies on average per...

  4. Project management as steppingstone of enterprises

    OpenAIRE

    Andreeva, T.; Petrovska, T.; Tytar, T.

    2011-01-01

    Actual problems of project management in enterprises in order to achieve their goals. The basic members of the organization and implementation of project and the methodology for their implementation. The basic principles of project management are included.

  5. PROJECT MANAGEMENT CONSIDERED IN A 2014 PERSPECTIVE

    Directory of Open Access Journals (Sweden)

    GRAPĂ ADELINA-ROXANA

    2014-05-01

    Full Text Available Project Management has come of age, yet multiple surveys and reports confirm the fact that the majority of projects are challenged. Given the more demanding and strict financial constraints associated with the current fiscal climate, project management is regarded as a tool that can deliver more with less. The literature on Project Management shows that, in spite of advancement in Project Management processes, tools and systems, project success has not significantly improved. This problem raises questions about the value and effectiveness of Project Management and Project Management systems. Programs and projects are considered as strategic assets for the majority of businesses, therefore, the trend of these organizations is to embrace a management by projects culture. The main objective of Project Management nowadays is to ensure programs and projects aligned to a certain strategy and also to provide for every member of an organization the ability to take proactive actions creating additional benefits.

  6. Research on Contractor Selection Based on Project Partnership%项目合作关系下承包商选择的研究

    Institute of Scientific and Technical Information of China (English)

    王舜; 马钦海; 冯卓

    2012-01-01

    针对建筑行业中业主与承包商通过合作可以实现双方共赢,但传统的承包商选择模型难以选择到合作关系下的承包商这一问题,利用因子分析法对影响建筑行业中项目合作成功的16个变量进行分析,提出了项目合作关系下承包商选择的基本框架,从一个全新的角度诠释了合作关系下的承包商选择的标准.指出业主企业在竞购阶段选取项目合作的承包商时应注重承包商的这四个方面:合作意愿、敏捷性能力、合作能力和竞购能力,为业主企业在竞购阶段正确选择项目合作承包商提供参考.%In view of the fact that with a more traditional contractor selection model it is rather difficult to pick out the right contractors based on project partnership,although both clients and contractors might benefit through cooperation in the construction industry,a factor analysis is employed to analyze the 16 variables affecting the successful project cooperation in the construction industry.It then puts forward a basic framework of contractor selection based on project partnership and interprets the criteria for contractor selection from a new perspective.Finally,the paper points out that clients should attach great importance to the following four aspects: willingness to cooperate,agility,ability to cooperate and capability of procurement,which could provide reference for them to select appropriate contractors at the procurement stage.

  7. 44 CFR 206.438 - Project management.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for project...

  8. PROJECT MANAGEMENT CONSIDERED IN A 2014 PERSPECTIVE

    OpenAIRE

    GRAPA ADELINA-ROXANA; SOARE ALICE-MAGDALENA

    2014-01-01

    Project Management has come of age, yet multiple surveys and reports confirm the fact that the majority of projects are challenged. Given the more demanding and strict financial constraints associated with the current fiscal climate, project management is regarded as a tool that can deliver more with less. The literature on Project Management shows that, in spite of advancement in Project Management processes, tools and systems, project success has not significantly improved. T...

  9. Risk Management of NASA Projects

    Science.gov (United States)

    Sarper, Hueseyin

    1997-01-01

    Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

  10. Measurement of software project management effectiveness

    OpenAIRE

    Demir, Kadir Alpaslan

    2008-01-01

    Approved for public release; distribution is unlimited. Evaluating, monitoring, and improving the effectiveness of project management can contribute to successful acquisition of software systems. In this dissertation, we introduce a quantitative metric for gauging the effectiveness of managing a software-development project. The metric may be used to evaluate and monitor project management effectiveness in software projects by project managers, technical managers, executive man...

  11. The application of modern project management principles and processes in major nuclear decommissioning programmes

    International Nuclear Information System (INIS)

    Bayliss, C. R.

    2003-01-01

    The UKAEA has embarked upon an accelerated programme of decommissioning works. This has resulted in a review of its project management systems and processes. This paper describes these processes and their application to nuclear decommissioning and associated new build construction projects. Efficiencies from these processes are necessary. In addition this paper describes how UKAEA, where appropriate, utilizes modern forms of alliance contract so as to work in partnership with its contractors. (author)

  12. Project management in fossil plant construction: A perspective for the Nineties

    International Nuclear Information System (INIS)

    Bhatia, N.K.

    1991-01-01

    The continuing growth in demand for electric power, and the reluctance of electric utility management to commit to new capacity additions has created a potential for somewhat hectic activity in the fossil power plant construction market. With the changing matrix of power plant types and ownerships, the project manager is called upon to deliver a complex product with exacting contract requirements: lump sum contracts, competitive pricing, short schedules, and performance guarantees. A shortage of experienced professionals in the ranks of the owners, engineers, contractors, and suppliers magnifies the challenge. Plant replication, automation, creative management of vendors and contractors, and participative management of the work force will be key elements of successful projects. Partnering between the clients and the engineers-constructors will be an interesting new relationship model

  13. Project Management Yinyang: Coupling project success and client satisfaction

    Directory of Open Access Journals (Sweden)

    Greg Stewart Usher

    2017-06-01

    Full Text Available Our research applies paradox theory to a project management construct to help project management researchers and practitioners understand the tensions that can exist between project success and client satisfaction. Our research highlights that although project success and client satisfaction are both present within a project management construct, they also belong to different functional systems. Project success and client satisfaction have different systemic-discourses and use different language games to convey information. These distinctions can create latent and sometimes salient tensions within the project management construct that project managers must understand, embrace, and work with. We have used a Grounded Theory (GT methodology to explore the lived experience of project managers, and from this have identified a phenomenon which we have termed project management yinyang. Project management yinyang is the state that exists when both project success and Client satisfaction are tightly coupled within the project management construct. Project management yinyang highlights that these two phenomena cannot be viewed as separate elements because the ‘seed’ of each exists within the other. And to truly achieve one, you must also achieve the other. Our findings indicate that in order to create project management yinyang the project manager must embrace a paradoxical yet holistic philosophy. They must understand the complementarity, interdependency, and structural coupling that exists between the positivist and interpretivist paradigms within the project management construct. They must understand how satisfaction (Yin and success (Yang are created through focus. Furthermore, they must understand how project management yinyang is separate from, but borne from, the convergence of the other two elements.

  14. Project manager attributes influencing project success in the South ...

    African Journals Online (AJOL)

    success criteria for building projects in Ghana and concluded that the “current and ... qualifications, profession, leadership style and project team ... and expectations of project management competence between ... 1.d. Sense of teamwork ...

  15. ACED Federal Grant Contractor Tracking

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Dataset includes grant, project, and contractor awarded which are tracked for ensuring Davis-Bacon Act compliance where applicable. The 1931 Davis-Bacon Act...

  16. Site contractor participation in the DOE SWEIS process at Los Alamos, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Pendergrass, A.; Garvey, D.

    1997-12-01

    The U.S. Department of Energy (DOE) prepares site-wide environmental impact statements (SWEIS) on sites that are to remain in operation in order to provide an estimate of the cumulative environmental impacts from projected future operations at the site. DOE has relied on outside contractors rather than the site management and operating (M&O) contractors to prepare EISs, in order to preclude the potential for conflict of interest. The site M&O contractors, who know the potential for conflict of interest. The site M&O contractors, who know the site best and are most familiar with existing information, are critical support for the contractor. The University of California (UC) is the site M&O contractor for Los Alamos National Laboratory (LANL) in Los Alamos, NM. The role of LANL (UC) personnel in DOE`s preparation process for the LANL SWEIS is described. 3 refs.

  17. Oil sands tailings management project

    Energy Technology Data Exchange (ETDEWEB)

    Godwalt, C. [Alberta WaterSMART, Calgary, AB (Canada); Kotecha, P. [Suncor Energy Inc, Calgary, AB (Canada); Aumann, C. [Alberta Innovates - Technology Futures, Alberta Governement, AB (Canada)

    2010-11-15

    The Oil sands leadership initiative (OSLI) works with the Government of Alberta on the development of the oil sands industry, considering environmental, economical and social aspects. Water management was identified as one of most important areas to focus on. Alberta WaterSMART was requested to support the development and the management of projects resulting from the work done or underway in this field. The development of a regional water management solution stood out as the most interesting solution to obtain significant results. In the Athabasca Region, oil sands producers work independently on their water sourcing and disposal with particular attention to fresh water conservation and economics. The Athabasca River represents a source for mines and distant saline aquifers are the target of steam assisted gravity drainage (SAGD) operators. As part of a four-phase project aiming to study the environmental and economic footprint (EEF) benefit of alternatives for Athabasca oil sands production water supply and disposal, the purpose of the tailings water management project was to identify tailings treatment technologies that are ready to be implemented, and to design and evaluate solutions in order to improve regional oil sands production water sourcing and disposal. Alternatives were evaluated based on their total EEF, applying a lifecycle assessment methodology with a particular attention on the quantification of important performance indicators. 25 refs., 8 tabs., 40 figs.

  18. Oil sands tailings management project

    International Nuclear Information System (INIS)

    Godwalt, C.; Kotecha, P.; Aumann, C.

    2010-11-01

    The Oil sands leadership initiative (OSLI) works with the Government of Alberta on the development of the oil sands industry, considering environmental, economical and social aspects. Water management was identified as one of most important areas to focus on. Alberta WaterSMART was requested to support the development and the management of projects resulting from the work done or underway in this field. The development of a regional water management solution stood out as the most interesting solution to obtain significant results. In the Athabasca Region, oil sands producers work independently on their water sourcing and disposal with particular attention to fresh water conservation and economics. The Athabasca River represents a source for mines and distant saline aquifers are the target of steam assisted gravity drainage (SAGD) operators. As part of a four-phase project aiming to study the environmental and economic footprint (EEF) benefit of alternatives for Athabasca oil sands production water supply and disposal, the purpose of the tailings water management project was to identify tailings treatment technologies that are ready to be implemented, and to design and evaluate solutions in order to improve regional oil sands production water sourcing and disposal. Alternatives were evaluated based on their total EEF, applying a lifecycle assessment methodology with a particular attention on the quantification of important performance indicators. 25 refs., 8 tabs., 40 figs.

  19. Interface management for the Yucca Mountain Project

    International Nuclear Information System (INIS)

    1988-12-01

    The subject of this report is selection of that portion of physical and informational interfaces that need to be controlled on the Yucca Mountain Project (YMP). Physical interfaces are interactions between physical elements of the mined geologic disposal system; for example, the repository shafts will interface with the shafts in the Exploratory Shaft Facility (ESF), because the ESF shafts will eventually be absorbed into the repository as additional repository shafts. Informational interfaces are interactions involving an exchange of information between organizations working on the mined geologic disposal system; for example, the in situ testing contractor will interact with the site performance assessment contractor and will supply information regarding host rock behavior. This report describes the physical system interfaces that can be identified from analysis of a physical system structure. A discussion of informational interfaces can be found elsewhere. 30 refs., 8 figs., 3 tabs

  20. Breakthrough Propulsion Physics Project: Project Management Methods

    Science.gov (United States)

    Millis, Marc G.

    2004-01-01

    To leap past the limitations of existing propulsion, the NASA Breakthrough Propulsion Physics (BPP) Project seeks further advancements in physics from which new propulsion methods can eventually be derived. Three visionary breakthroughs are sought: (1) propulsion that requires no propellant, (2) propulsion that circumvents existing speed limits, and (3) breakthrough methods of energy production to power such devices. Because these propulsion goals are presumably far from fruition, a special emphasis is to identify credible research that will make measurable progress toward these goals in the near-term. The management techniques to address this challenge are presented, with a special emphasis on the process used to review, prioritize, and select research tasks. This selection process includes these key features: (a) research tasks are constrained to only address the immediate unknowns, curious effects or critical issues, (b) reliability of assertions is more important than the implications of the assertions, which includes the practice where the reviewers judge credibility rather than feasibility, and (c) total scores are obtained by multiplying the criteria scores rather than by adding. Lessons learned and revisions planned are discussed.

  1. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  2. [The research project: financing and management].

    Science.gov (United States)

    Schena, F P

    2003-01-01

    Basic and clinical research is accomplished by projects. The design of a project is not only based on the scientific content but also on its financing and management. This article wants to illustrate the correct modalities for project financing and project management in a scientific project.

  3. Project management v praxi

    OpenAIRE

    Králová, Eliška

    2013-01-01

    Project management approaches are commonly used to write and implement business plans. In this thesis standard project management tools and methods are applied to a real project, which aims to improve the properties of the product it offers (an online educational game). This project is unique in that it is based on a voluntary basis, has limited resources and is very responsive to market demands. Project management is broken down into four stages according to the project life cycle: initiatio...

  4. Managing MDO Software Development Projects

    Science.gov (United States)

    Townsend, J. C.; Salas, A. O.

    2002-01-01

    Over the past decade, the NASA Langley Research Center developed a series of 'grand challenge' applications demonstrating the use of parallel and distributed computation and multidisciplinary design optimization. All but the last of these applications were focused on the high-speed civil transport vehicle; the final application focused on reusable launch vehicles. Teams of discipline experts developed these multidisciplinary applications by integrating legacy engineering analysis codes. As teams became larger and the application development became more complex with increasing levels of fidelity and numbers of disciplines, the need for applying software engineering practices became evident. This paper briefly introduces the application projects and then describes the approaches taken in project management and software engineering for each project; lessons learned are highlighted.

  5. Project report - an overview of the project and experiences with project management

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Mikkelsen, Bent Egberg

    1996-01-01

    A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project.......A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project....

  6. 48 CFR 1602.170-4 - Contractor.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor. 1602.170-4 Section 1602.170-4 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES... 1602.170-4 Contractor. Contractor means carrier. ...

  7. Essentials of Project and Systems Engineering Management

    CERN Document Server

    Eisner, Howard S

    2008-01-01

    The Third Edition of Essentials of Project and Systems Engineering Management enables readers to manage the design, development, and engineering of systems effectively and efficiently. The book both defines and describes the essentials of project and systems engineering management and, moreover, shows the critical relationship and interconnection between project management and systems engineering. The author's comprehensive presentation has proven successful in enabling both engineers and project managers to understand their roles, collaborate, and quickly grasp and apply all the basic princip

  8. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  9. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD. INTEGRATED DISPOSAL FACILITY (IDF)

    International Nuclear Information System (INIS)

    MCLELLAN, G.W.

    2007-01-01

    permitting, scheduling, costs, stakeholders and technical issues. To meet the customer's needs and deadlines, the project was managed with conscientious discipline and application of sound project management principles in the Project Management Institute's Project Management Body of Knowledge. Several factors contributed to project success. Extensive planning and preparation were conducted, which was instrumental to contract and procurement management. Anticipating issues and risks, CH2M HILL prepared well defined scope and expectations, particularly for safety. To ensure worker safety, the project management team incorporated CH2M HILL's Integrated Safety Management System (ISMS) into the project and included safety requirements in contracting documents and baseline planning. The construction contractor DelHur Industries, Inc. adopted CH2M HILL's safety program to meet the procurement requirement for a comparable ISMS safety program. This project management approach contributed to an excellent safety record for a project with heavy equipment in constant motion and 63,555 man-hours worked. The project manager worked closely with ORP and Ecology to keep them involved in project decisions and head off any stakeholder or regulatory concerns. As issues emerged, the project manager addressed them expeditiously to maintain a rigorous schedule. Subcontractors and project contributors were held to contract commitments for performance of the work scope and requirements for quality, budget and schedule. Another element of project success extended to early and continual involvement of all interested in the project scope. Due to the public sensitivity of constructing a landfill planned for radioactive waste as well as offsite waste, there were many stakeholders and it was important to secure their agreement on scope and time frames. The project had multiple participants involved in quality assurance surveillances, audits and inspections, including the construction contractor, CH2M HILL

  10. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD INTEGRATED DISPOSAL FACILITY (IDF)

    Energy Technology Data Exchange (ETDEWEB)

    MCLELLAN, G.W.

    2007-02-07

    issues as well as challenges with permitting, scheduling, costs, stakeholders and technical issues. To meet the customer's needs and deadlines, the project was managed with conscientious discipline and application of sound project management principles in the Project Management Institute's Project Management Body of Knowledge. Several factors contributed to project success. Extensive planning and preparation were conducted, which was instrumental to contract and procurement management. Anticipating issues and risks, CH2M HILL prepared well defined scope and expectations, particularly for safety. To ensure worker safety, the project management team incorporated CH2M HILL's Integrated Safety Management System (ISMS) into the project and included safety requirements in contracting documents and baseline planning. The construction contractor DelHur Industries, Inc. adopted CH2M HILL's safety program to meet the procurement requirement for a comparable ISMS safety program. This project management approach contributed to an excellent safety record for a project with heavy equipment in constant motion and 63,555 man-hours worked. The project manager worked closely with ORP and Ecology to keep them involved in project decisions and head off any stakeholder or regulatory concerns. As issues emerged, the project manager addressed them expeditiously to maintain a rigorous schedule. Subcontractors and project contributors were held to contract commitments for performance of the work scope and requirements for quality, budget and schedule. Another element of project success extended to early and continual involvement of all interested in the project scope. Due to the public sensitivity of constructing a landfill planned for radioactive waste as well as offsite waste, there were many stakeholders and it was important to secure their agreement on scope and time frames. The project had multiple participants involved in quality assurance surveillances, audits and

  11. The Kozloduy project management unit

    International Nuclear Information System (INIS)

    Carnes, W.S.; Gros-Gean, P.; Demireva, E.

    2004-01-01

    The Project Management Unit (PMU) has been established in support to the Kozloduy NPP decommissioning department. It is comprised of a Consortium of the British Nuclear Group, EDF and subcontractor ENPRO Consult. It is responsible for the management of seven projects (a facility for dry storage of spent fuel; equipment to treat low activity liquid radioactive waste; provision of physical separation of the plant systems and areas to be decommissioned from the ones in operation; equipment to decontaminate and clean pools and large tanks; a facility to provide high volume reduction of solid radioactive wastes and retrieval and conditioning of ion exchange resins and other sorbents; equipment to provide measurement for the free-release of materials and components; a facility for personnel monitoring, decontamination and clothes changing for work outside of the normal radiological control areas) that will be used in support of the KNPP decommissioning process. The projects will be tendered in compliance with the European Bank for Reconstruction and Development requirements

  12. Project Management Communication 2.0

    DEFF Research Database (Denmark)

    Berggreen, Line; Kampf, Constance Elizabeth

    2015-01-01

    How can we understand project management communication practices for developing effective practices in professional and technical communication? In this article we explore an approach to project management that focuses on projects as having a technical documentation structure with content...... that is developed through social or interpersonal communication practices. Looking at the broader picture of project management which besides the implementation phase also includes conception, planning and closure, we see a project management framework that brings together both technical and social aspects...... of project communication. To understand how this works, we interviewed project managers about their understanding and strategy in communicating about the projects they lead. Findings demonstrate that more experienced project managers have a more nuanced understanding of project communication as both...

  13. Project Management – Multi-perspective Leadership

    DEFF Research Database (Denmark)

    Riis, Eva

    2014-01-01

    Project Management – Multi-perspective Leadership” af Hans Mikkelsen og Jens Ove Riis - anmeldelse......”Project Management – Multi-perspective Leadership” af Hans Mikkelsen og Jens Ove Riis - anmeldelse...

  14. Project management in the library workplace

    CERN Document Server

    Daugherty, Alice

    2018-01-01

    This volume of Advances in Library Administration and Organization attempts to put project management into the toolboxes of library administrators through overviews of concepts, analyses of experiences, and forecasts for the use of project management within the profession.

  15. Risk management in product innovation projects

    NARCIS (Netherlands)

    Halman, J.I.M.; Keizer, J.A.

    1993-01-01

    In product innovation projects risk management has become increasingly important. Technological and commercial developments ask for effective and efficient product innovation. Systematic diagnosing and management of risks can help to make product innovation projects successful. In this paper a

  16. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Keywords: Communication skills and leadership model, construction project ..... help a manager handle stress and break tension (Gido & Clements,. 2012: 331; Harrin .... production and management of projects, the higher the demand for.

  17. Project management in practice : Evaluating a case project through project management theories

    OpenAIRE

    Uusitalo, Jenni

    2013-01-01

    The purpose of this thesis was to evaluate a case project and to study whether it was carried out in a correct manner; meaning that did the case project follow the project management models. In addition, part of the study was to determine what could have been improved in the management of the case project. The case project was about creating and launching a communication channel based on a social media service, on a blog platform called Tumblr, for Team Finland in Spain network. The network p...

  18. Project management. A discipline which contributes to project success

    International Nuclear Information System (INIS)

    Hoch, G.

    2008-01-01

    The presentation covers the following topics: description of the Project - a contract was signed between KNPP and European Consortium Kozloduy (ECK) consisting of Framatome ANP GmbH as Leader (63%), Framatome ANP S.A.S. (17%), Atomenergoexport (20%) ; Project management in the modernization of NPP Kozloduy units 5 and 6; Project management process within AREVA NP GmbH; current status

  19. The Little Black Book of Project Management

    CERN Document Server

    Thomsett, Michael C

    2009-01-01

    For nearly twenty years, The Little Black Book of Project Management has provided businesspeople everywhere with a quick and effective introduction to project management tools and methodology. The revised and updated third edition reflects the newest techniques, the latest project management software, as well as the most recent changes to the Project Management Body of Knowledge (PMBOK™). Readers will find invaluable strategies for: • Organizing any project • Choosing the project team • Preparing a budget and sticking to it • Scheduling, flowcharting, and controlling a project • Preparing proj

  20. On Services for Collaborative Project Management

    Science.gov (United States)

    Ollus, Martin; Jansson, Kim; Karvonen, Iris; Uoti, Mikko; Riikonen, Heli

    This paper presents an approach for collaborative project management. The focus is on the support of collaboration, communication and trust. Several project management tools exist for monitoring and control the performance of project tasks. However, support of important intangible assets is more difficult to find. In the paper a leadership approach is identified as a management means and the use of new IT technology, especially social media for support of leadership in project management is discussed.

  1. Managing dualities in organizational change projects

    OpenAIRE

    Shaw, David

    2016-01-01

    When managers want to change their organisation they often set up a project to do it, in the belief that doing so simplifies and focuses the change initiative and brings greater assurance of success. Case studies of three organisational change projects undertaken by Arts Council England during 2006-2007 are used to examine the notion of project management and change management as a duality. It is argued that the structured, systematic approach associated with project management needs to be ba...

  2. Spent Nuclear Fuel Project Safety Management Plan

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1996-02-01

    The Spent Nuclear Fuel Project Safety Management Plan describes the new nuclear facility regulatory requirements basis for the Spemt Nuclear Fuel (SNF) Project and establishes the plan to achieve compliance with this basis at the new SNF Project facilities

  3. Development of funding project risk management tools.

    Science.gov (United States)

    2013-11-01

    Funding project risk management is a process for identifying, assessing, and prioritizing project funding risks. To plan to : minimize or eliminate the impact of negative events, one must identify what projects have higher risk to respond to potentia...

  4. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  5. 76 FR 67400 - Capital Project Management

    Science.gov (United States)

    2011-11-01

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... extending the comment period on its proposed rule for Capital Project Management to December 2, 2011, to...) proposing to transform the current FTA rule for project management oversight into a discrete set of...

  6. 76 FR 56363 - Capital Project Management

    Science.gov (United States)

    2011-09-13

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... current FTA rule for project management oversight into a discrete set of managerial principles for sponsors of major capital projects; enable FTA to more clearly identify the necessary management capacity...

  7. 78 FR 16460 - Capital Project Management

    Science.gov (United States)

    2013-03-15

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... withdrawing its September 13, 2011, Notice of Proposed Rulemaking to revise the agency's project management... will reinitiate a rulemaking for project management oversight in the near future. Additionally, FTA may...

  8. Finance and supply management project execution plan

    Energy Technology Data Exchange (ETDEWEB)

    BENNION, S.I.

    1999-02-10

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  9. The evolution of the project management

    Directory of Open Access Journals (Sweden)

    Catalin Drob

    2009-12-01

    Full Text Available Project management has appeared and developed based on scientific management theory during the '50s-'60s of the last century. After the 1990s of the last century, we can say that project management has truly become an independent discipline, which has a huge impact on the success or failure of companies which are engaged in major projects.

  10. IX Disposition Project - project management plan

    International Nuclear Information System (INIS)

    Choi, I.G.

    1994-01-01

    This report presents plans for resolving saving and disposal concerns for ion exchange modules, cartridge filters and columns. This plan also documents the project baselines for schedules, cost, and technical information

  11. Does Lean & Agile Project Management Help Coping with Project Complexity?

    NARCIS (Netherlands)

    Jalali Sohi, A.; Hertogh, M.J.C.M.; Bosch-Rekveldt, M.G.C.; Blom, R.; Serpell, A.; Ferrada, X.

    2016-01-01

    Still, projects in the construction sector are delivered with time delays and cost overruns. One of the reasons for poor performance was assigned to project complexity. A combination of lean construction and agile project management are hypothesized as a possible solution to cope with project

  12. Female Project Managers' Workplace Problems: a Survey

    Science.gov (United States)

    Duong, Thuong Thi; Skitmore, Martin

    This article examines the extent to which challenges in the workplace may cause female project managers to be in a significantly small minority. A survey of members of the Australian Institute of Project Management in Queensland is described. This compares the experiences and observations of both men and women on various issues related to technical and gender aspects in project management workplaces. The results show that although female project managers experience many problems, male project managers also experience most of the same problems. Likewise, there are also few differences between more and less experience, the level of management, and types of industries. The differences that do occur involve discrimination against women in general, differences in project management styles, and support from other project managers.

  13. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  14. Defense Primer: DOD Contractors

    Science.gov (United States)

    2017-02-10

    functions, from intelligence analysis or software development to landscaping or food service. Why does DOD use individual contractors? Going back to...that provide professional services, from research to management support. The bulk of contractors—more than 70%—provide products, and these include...10 U.S.C. Part IV: Service, Supply, and Procurement. CRS Products CRS In Focus IF10548, Defense Primer: U.S. Defense Industrial Base, by Daniel

  15. 97 Things Every Project Manager Should Know

    CERN Document Server

    Davis, Barbee

    2009-01-01

    If the projects you manage don't go as smoothly as you'd like, 97 Things Every Project Manager Should Know offers knowledge that's priceless, gained through years of trial and error. This illuminating book contains 97 short and extremely practical tips -- whether you're dealing with software or non-IT projects -- from some of the world's most experienced project managers and software developers. You'll learn how these professionals have dealt with everything from managing teams to handling project stakeholders to runaway meetings and more. While this book highlights software projects, its w

  16. SharePoint 2010 for Project Management

    CERN Document Server

    Sy, Dux

    2012-01-01

    If you were to analyze your team's performance on a typical project, you'd be surprised how much time is wasted on non-productive tasks. This hands-on guide shows you how to work more efficiently by organizing and managing projects with SharePoint 2010. You'll learn how to build a Project Management Information System (PMIS), customized to your project, that can effectively coordinate communication and collaboration among team members. Written by a certified Project Management Professional (PMP) and Microsoft SharePoint MVP with 15 years of IT project management experience, each chapter incl

  17. TERMINOLOGY MANAGEMENT FRAMEWORK DEVIATIONS IN PROJECTS

    Directory of Open Access Journals (Sweden)

    Олена Борисівна ДАНЧЕНКО

    2015-05-01

    Full Text Available The article reviews new approaches to managing projects deviations (risks, changes, problems. By offering integrated control these parameters of the project and by analogy with medical terminological systems building a new system for managing terminological variations in the projects. With an improved method of triads system definitions are analyzed medical terms that make up terminological basis. Using the method of analogy proposed new definitions for managing deviations in projects. By using triad integrity built a new system triad in project management, which will subsequently also analogous to develop a new methodology of deviations in projects.

  18. Transportation engineering project management : survey of practice.

    Science.gov (United States)

    2017-01-01

    Utah Department of Transportation (UDOT) project managers (PMs) have identified inefficiencies in the legacy : system electronic Program Management (ePM) used to manage consultant contracts and invoices. To help UDOT : prepare for potential system im...

  19. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  20. PROJECT HANFORD MANAGEMENT CONTRACT (PHMC) PERFORMANCE REPORT 05/2004 (WWW.HANFORD.GOV/EMPR.INDEX.CFM)

    International Nuclear Information System (INIS)

    PIELSTICK, R.M.

    2004-01-01

    This report is the monthly performance summary of the Central Plateau Contractors. FH work scope responsibilities are described, and other contractor/RL-managed work is excluded. Section A, Overview, provides a summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides key performance activities as extracted from the contractor baseline. Subsequent sections of this report provide detailed performance data relative to contract sections (e.g., Project Hanford Cleanup Work Summary, Waste and Spent Nuclear Fuel Management Operations, Infrastructure and Hanford Site Services, and other Work Scope). All information is as of the end of May 2004 unless otherwise noted

  1. Best in Class Project Management and Contract Management Initiative at the Department of Energy's Office of Environmental Management

    International Nuclear Information System (INIS)

    Van Camp, S.G.; Stevenson, J.S.; Deiters, M.G.

    2009-01-01

    Since its founding in 1989, the U.S. Department of Energy (DOE), Office of Environmental Management (EM) has struggled with a legacy of inadequate project and contract management. This has been manifested in recurring scope changes, cost overruns and schedule delays, and has been documented in multiple internal and external reviews. To address this issue, EM has developed a vision for building a 'Best in Class' Project Management and Contract Management (BICPM) organization. To develop the strategy and implement the process to accomplish this vision, EM contracted with the U.S. Army Corps of Engineers (USACE) and their support contractors. EM and the USACE Team developed a five-phased approach to implement the BICPM Initiative: (I) develop assessment criteria, (II) assess existing project and contract management capabilities, (III) develop an implementation plan, (IV) implement corrective actions, and (V) institutionalize BICPM. Under Phases I and II, the USACE Team assessed the status of project and contract management capabilities at 16 EM offices. These assessments evaluated strengths and weaknesses in 12 key project management capabilities and benchmarks and three contract management benchmarks. Under Phase III, EM and the USACE Team developed the Corporate Implementation Plan which identified the key challenges and provided a road-map to address these challenges and to implement BICPM. These challenges included: Federal staffing shortages; integration of project and contract management; further development of project-oriented culture; project baseline maintenance; consistent implementation of the DOE order for project management, 413.3A; and role of EM Headquarters in BICPM. The shortage of qualified resources dedicated to supporting Federal project and contract management functions was identified as a primary cause for project and contract management difficulties within EM. The Corporate Implementation Plan outlined a set of 18 specific Recommended Priority

  2. Apply Lean Thinking in Project Management

    OpenAIRE

    Pham Ngoc, Lan

    2015-01-01

    The purpose of this thesis was to study the effects of Lean Thinking in Project Management and how applying Lean Project Management could enhance the productivity of project work. The study was carried using theoretical research and collecting empirical data from three interviews and one case study at a local company. At the end of the study, the major project management problems at the company were identified and analyzed following Lean Principles. It was also pointed out where there...

  3. The NIOSH Radiation Dose Reconstruction Project: managing technical challenges.

    Science.gov (United States)

    Moeller, Matthew P; Townsend, Ronald D; Dooley, David A

    2008-07-01

    Approximately two years after promulgation of the Energy Employees Occupational Illness Compensation Program Act, the National Institute for Occupational Safety and Health Office of Compensation and Analysis Support selected a contractor team to perform many aspects of the radiation dose reconstruction process. The project scope and schedule necessitated the development of an organization involving a comparatively large number of health physicists. From the initial stages, there were many technical and managerial challenges that required continuous planning, integration, and conflict resolution. This paper identifies those challenges and describes the resolutions and lessons learned. These insights are hopefully useful to managers of similar scientific projects, especially those requiring significant data, technical methods, and calculations. The most complex challenge has been to complete defensible, individualized dose reconstructions that support timely compensation decisions at an acceptable production level. Adherence to applying claimant-favorable and transparent science consistent with the requirements of the Act has been the key to establishing credibility, which is essential to this large and complex project involving tens of thousands of individual stakeholders. The initial challenges included garnering sufficient and capable scientific staff, developing an effective infrastructure, establishing necessary methods and procedures, and integrating activities to ensure consistent, quality products. The continuing challenges include maintaining the project focus on recommending a compensation determination (rather than generating an accurate dose reconstruction), managing the associated very large data and information management challenges, and ensuring quality control and assurance in the presence of an evolving infrastructure. The lessons learned concern project credibility, claimant favorability, project priorities, quality and consistency, and critical

  4. 48 CFR 970.5244-1 - Contractor purchasing system.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor purchasing... for Management and Operating Contracts 970.5244-1 Contractor purchasing system. As prescribed in 970.4403 insert the following clause: Contractor Purchasing System (AUG 2009) (a) General. The Contractor...

  5. Culture and conflict management style of international project managers

    OpenAIRE

    Mohammed, U. K.; Prabhakar, G. P.; White, G.

    2008-01-01

    The management of culture has become increasingly important to many organisations and business disciplines, particularly multicultural and international project management. Cultural differences often result in varying degrees of conflict and require careful consideration. This study surveys 116 Project Managers using the Thomas-Kilmann Conflict Mode Instrument to determine their approach toward managing conflict. Indian, French and UK Project Managers’ conflict management style are correlated...

  6. Project management plan double-shell tank system specification development

    International Nuclear Information System (INIS)

    Conrads, T.J.

    1998-01-01

    The Project Hanford Management Contract (PHMC) members have been tasked by the US Department of Energy (DOE) to support removal of wastes from the Hanford Site 200 Area tanks in two phases. The schedule for these phases allows focusing on requirements for the first phase of providing feed to the privatized vitrification plants. The Tank Waste Retrieval Division near-term goal is to focus on the activities to support Phase 1. These include developing an integrated (technical, schedule, and cost) baseline and, with regard to private contractors, establishing interface agreements, constructing infrastructure systems, retrieving and delivering waste feed, and accepting immobilized waste products for interim onsite storage. This document describes the process for developing an approach to designing a system for retrieving waste from double-shell tanks. It includes a schedule and cost account for the work breakdown structure task

  7. Open Source Approach to Project Management Tools

    Directory of Open Access Journals (Sweden)

    Romeo MARGEA

    2011-01-01

    Full Text Available Managing large projects involving different groups of people and complex tasks can be challenging. The solution is to use Project management software, which allows a more efficient management of projects. However, famous project management systems can be costly and may require expensive custom servers. Even if free software is not as complex as Microsoft Project, is noteworthy to think that not all projects need all the features, amenities and power of such systems. There are free and open source software alternatives that meet the needs of most projects, and that allow Web access based on different platforms and locations. A starting stage in adopting an OSS in-house is finding and identifying existing open source solution. In this paper we present an overview of Open Source Project Management Software (OSPMS based on articles, reviews, books and developers’ web sites, about those that seem to be the most popular software in this category.

  8. MULTIPLE PROJECT MANAGEMENT IN THE CONSTRUCTION INDSUTRY

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2010-06-01

    Full Text Available The field of project management has historically focused on the administration of one project at a time, a focus that is insufficient given the growing need for organizations to manage multiple projects simultaneously. The requirements of Multiple Project Management (MPM involves demands and practices that are different from those of single projects. MPM poses a special need for coordination of shared resources across multiple projects in a way that can maintain the firm’s strategic focus and facilitate effective decision making. The construction industry is noteworthy for its frequent need for the management of multiple projects. This paper offers a review of the last five years of indexed literature related to multiple project management in the construction industry, identifies gaps and suggests promising new avenues of inquiry.

  9. Application of Project Time Management Tools and Techniques to the Construction Industry in the Gaza Strip

    Directory of Open Access Journals (Sweden)

    Nabil Sawalhi

    2012-11-01

    Full Text Available The objective of this paper is to investigate the level of applying theproject time management tools and techniques by public ownersand construction contractors in the Gaza Strip. This study hasbeen conducted by means of a survey questionnaire. Seventythreequestionnaires were distributed to target constructioncontractors and twenty-five questionnaires to public owners. Sixtycompleted questionnaires from contractors and twenty-threequestionnaires from public owners were received and analysed.The survey results indicated that contemporary project timemanagement tools and techniques are not widely used amonglocal contractors and owners. Lack of subcontractor’s knowledgeand awareness of the importance of project time managementtools and techniques are still major obstacles toward the efficientutilisation of such tools. This study recommended that there is anurgent need to establish a professional industry body such as anInstitute of Building to review and evaluate existing local projectmanagement practices. This professional body may be establishedby the government through the Ministry of Housing and PublicWorks or by the local university in cooperation with a similarinternational professional industry body. Current training effortshould be tailored to encourage owners and contractors to usework breakdown structures, resource optimisation, and networkscheduling.

  10. MANAGING INNOVATION PROJECTS USING DISTRIBUTION LOGISTICS

    Directory of Open Access Journals (Sweden)

    Erika Loučanová

    2015-12-01

    Full Text Available A significant part of innovation projects management is the distribution logistics. From the point of view of time and material content, the properly chosen way of distribution is one of many factors for success of the project and innovation creation itself. The paper points out the fundamental basis of innovation management in the stage of its realization referring to the importance of distribution logistics in this part of innovation project management. Distribution logistics in the project management provides comprehensive solutions to efficiency of tangible relocating processes in all connections and mutual relations of project in order to maintain compliance between economy and business when implementing innovations.

  11. Managing complex, high risk projects a guide to basic and advanced project management

    CERN Document Server

    Marle, Franck

    2016-01-01

    Maximizing reader insights into project management and handling complexity-driven risks, this book explores propagation effects, non-linear consequences, loops, and the emergence of positive properties that may occur over the course of a project. This book presents an introduction to project management and analysis of traditional project management approaches and their limits regarding complexity. It also includes overviews of recent research works about project complexity modelling and management as well as project complexity-driven issues. Moreover, the authors propose their own new approaches, new methodologies and new tools which may be used by project managers and/or researchers and/or students in the management of their projects. These new elements include project complexity definitions and frameworks, multi-criteria approaches for project complexity measurement, advanced methodologies for project management (propagation studies to anticipate potential behaviour of the project, and clustering approaches...

  12. Project Management in Real Time: A Service-Learning Project

    Science.gov (United States)

    Larson, Erik; Drexler, John A., Jr.

    2010-01-01

    This article describes a service-learning assignment for a project management course. It is designed to facilitate hands-on student learning of both the technical and the interpersonal aspects of project management, and it involves student engagement with real customers and real stakeholders in the creation of real events with real outcomes. As…

  13. Uranium Mill Tailings Remedial Action Project surface project management plan

    International Nuclear Information System (INIS)

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials

  14. Project management strategies for prototyping breakdowns

    DEFF Research Database (Denmark)

    Granlien, Maren Sander; Pries-Heje, Jan; Baskerville, Richard

    2009-01-01

    , managing the explorative and iterative aspects of prototyping projects is not a trivial task. We examine the managerial challenges in a small scale prototyping project in the Danish healthcare sector where a prototype breakdown and project escalation occurs. From this study we derive a framework...... of strategies for coping with escalation in troubled prototyping projects; the framework is based on project management triangle theory and is useful when considering how to manage prototype breakdown and escalation. All strategies were applied in the project case at different points in time. The strategies led...

  15. Chosen aspects of innovative projects management

    Directory of Open Access Journals (Sweden)

    J. Gawlik

    2010-07-01

    Full Text Available Any company willing to maintain its market position has to search and implement innovative products and services. Integrated development ofenterprise’s innovative activity requests a constant search for new technologies and new organizational forms. Ability of effectivemanagement of innovative projects becomes a crucial issue. The paper presents a characteristic of innovative projects accordingly toOECD standards. Project management concepts based on Project Management Institute (PMI and International Project ManagementAssociation (IPMA procedures have been discussed. Key success factors have been defined, i.e.: obtaining assumed project outcome (range, project implementation conform to planned schedule (deadline, maintaining project costs under a certain limit (budget, quality (are the customers satisfied?, resources (team losses and interpersonal relations. Tables comparing product innovativeness with fields of requested know – how for particular product innovativeness levels have been elaborated. Finally, SCRUM method of adaptive project management aiming at providing possibly optimal outcome has been described.

  16. 43 CFR 418.29 - Project management.

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to be...

  17. Graduate Student Project: Operations Management Product Plan

    Science.gov (United States)

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  18. Basic Project Management Methodologies for Survey Researchers.

    Science.gov (United States)

    Beach, Robert H.

    To be effective, project management requires a heavy dependence on the document, list, and computational capability of a computerized environment. Now that microcomputers are readily available, only the rediscovery of classic project management methodology is required for improved resource allocation in small research projects. This paper provides…

  19. SIMULATION OF ORGANIZATIONAL ILLNESSES IN PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Денис Антонович ХАРИТОНОВ

    2015-05-01

    Full Text Available The article examined the fractal model of organizational diagnosis of pathologies in project management development. The proposed fractal model based on the competency approach to project management and allows evaluating the pathology of the project-oriented organizations.

  20. Adaptation of Agile Project Management Methodology for Project Team

    Directory of Open Access Journals (Sweden)

    Rasnacis Arturs

    2015-12-01

    Full Text Available A project management methodology that defines basic processes, tools, techniques, methods, resources and procedures used to manage a project is necessary for effective and successful IT project management. Each company needs to define its own methodology or adapt some of the existing ones. The purpose of the research is to evaluate the possibilities of adapting IT project development methodology according to the company, company employee characteristics and their mutual relations. The adaptation process will be illustrated with a case study at an IT company in Latvia where the developed methodology is based on Agile Scrum, one of the most widespread Agile methods.

  1. Project management: importance for diagnostic laboratories.

    Science.gov (United States)

    Croxatto, A; Greub, G

    2017-07-01

    The need for diagnostic laboratories to improve both quality and productivity alongside personnel shortages incite laboratory managers to constantly optimize laboratory workflows, organization, and technology. These continuous modifications of the laboratories should be conducted using efficient project and change management approaches to maximize the opportunities for successful completion of the project. This review aims at presenting a general overview of project management with an emphasis on selected critical aspects. Conventional project management tools and models, such as HERMES, described in the literature, associated personal experience, and educational courses on management have been used to illustrate this review. This review presents general guidelines of project management and highlights their importance for microbiology diagnostic laboratories. As an example, some critical aspects of project management will be illustrated with a project of automation, as experienced at the laboratories of bacteriology and hygiene of the University Hospital of Lausanne. It is important to define clearly beforehand the objective of a project, its perimeter, its costs, and its time frame including precise duration estimates of each step. Then, a project management plan including explanations and descriptions on how to manage, execute, and control the project is necessary to continuously monitor the progression of a project to achieve its defined goals. Moreover, a thorough risk analysis with contingency and mitigation measures should be performed at each phase of a project to minimize the impact of project failures. The increasing complexities of modern laboratories mean clinical microbiologists must use several management tools including project and change management to improve the outcome of major projects and activities. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  2. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    2007-01-01

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, 'Quality Assurance Requirements', ANSI/ASQC E4-2004, 'Quality Systems for Environmental Data and Technology Programs - Requirements with Guidance for Use', and ISO 14001-2004, 'Environmental Management Systems', have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, 'Quality Assurance Program', identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, 'QA Program Implementation', identifies the TAC organizations that have responsibility for implementing the QA

  3. Software project management in a changing world

    CERN Document Server

    Ruhe, Günther

    2014-01-01

    By bringing together various current direc­tions, Software Project Management in a Changing World focuses on how people and organizations can make their processes more change-adaptive. The selected chapters closely correspond to the project management knowledge areas introduced by the Project Management Body of Knowledge, including its extension for managing software projects. The contributions are grouped into four parts, preceded by a general introduction. Part I "Fundamentals" provides in-depth insights into fundamental topics including resource allocation, cost estimation and risk manage

  4. Amine Swingbed Payload Project Management

    Science.gov (United States)

    Walsch, Mary; Curley, Su

    2013-01-01

    The International Space Station (ISS) has been designed as a laboratory for demonstrating technologies in a microgravity environment, benefitting exploration programs by reducing the overall risk of implementing such technologies in new spacecraft. At the beginning of fiscal year 2010, the ISS program manager requested that the amine-based, pressure-swing carbon dioxide and humidity absorption technology (designed by Hamilton Sundstrand, baselined for the Orion Multi-Purpose Crew Vehicle, and tested at the Johnson Space Center in relevant environments, including with humans, since 2005) be developed into a payload for ISS Utilization. In addition to evaluating the amine technology in a flight environment before the first launch of the Orion vehicle, the ISS program wanted to determine the capability of the amine technology to remove carbon dioxide from the ISS cabin environment at the metabolic rate of the full 6 ]person crew. Because the amine technology vents the absorbed carbon dioxide and water vapor to space vacuum (open loop), additional hardware needed to be developed to minimize the amount of air and water resources lost overboard. Additionally, the payload system would be launched on two separate Space Shuttle flights, with the heart of the payload-the swingbed unit itself-launching a full year before the remainder of the payload. This paper discusses the project management and challenges of developing the amine swingbed payload in order to accomplish the technology objectives of both the open -loop Orion application as well as the closed-loop ISS application.

  5. Improving Project Portfolio Management (PPM) for Improvement Projects

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Jakobsen, Peter M.; Korsaa, Morten

    2017-01-01

    Project Portfolio Management (PPM) focus on the integration and alignment of projects with the business operation in order to achieve most value and cost-efficiency for the investment in projects. PPM is often a challenge and especially so for improvement projects where PPM is considerably...... of evaluating a portfolio of improvement projects and combine this evaluation with the effect they have on the CMMI maturity level. Further, the paper demonstrates how the combination of a strong senior management requirement for improved maturity and the focus on getting the most value out of PPM made...

  6. UMTRA technical assistance contractor quality assurance program plan

    International Nuclear Information System (INIS)

    1994-10-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAc Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements

  7. The project manager's desk reference: project planning, schedulding, evaluation, control, systems

    National Research Council Canada - National Science Library

    Lewis, James P

    2007-01-01

    In this Third Edition of The Project Manager's Desk Reference, top project management consultant James Lewis arms you with today's most comprehensive and understandable project management resources...

  8. Status of Project Management Education in Pakistan

    Science.gov (United States)

    Arain, Faisal Manzoor; Tipu, Syed Awais Ahmad

    2009-01-01

    Emerging contractual delivery systems, collaborative partnerships, new management initiatives, and global product markets require professionals and students to have a broader awareness of construction methods and project management issues. This paper presents the state of the project management education in Pakistan. The analysis is based on…

  9. Scheduling in Engineering, Project, and Production Management

    OpenAIRE

    Chien-Ho Ko

    2015-01-01

    This issue presents five papers selected from the 2013 (4th) International Conference on Engineering, Project, and Production Management (EPPM2013) held in Bangkok, Thailand. Three of the papers deal with scheduling problems faced in project and production management, while the remaining two focus on engineering management issues.

  10. FIDIC contracts: analysis of the impact of general and particular conditions on the financial risk management in Romanian infrastructure projects

    Directory of Open Access Journals (Sweden)

    Constanţa-Nicoleta Bodea

    2016-12-01

    Full Text Available Construction projects are characterized by risks and uncertainties mainly due to technical and economic complexity. Risk management is an important tool in making decisions involving the identification and reduction, avoidance or transfer risk and uncertainties consequences of events that occurs during project implementation. For this reason, the objective of the contract between the beneficiary and the contractor is the allocation of risk. The distribution of risk in contracts for the execution of construction works was and is an ongoing challenge faced by parties having a significant impact on the type of contract is used. On the one hand, the beneficiaries tend to transfer to the contractors as many of the project risks and uncertainties, on the other hand, the contractors look to exploit any weakness contract, so as to reduce their impact on the expected profit. One of the most important risks assumed by the contractor by signing the contract which is also increasingly common in the current economic situation is the reduced financial capacity to support the project. A purely legal or purely technical interpretation is not meant to describe the complexity of issues related to implementation of construction projects. For this reason the authors have adopted a multi-disciplinary approach, which includes the legal issues related to the nature of the contract, but also the financial and technical aspects of construction projects. The paper aims to analyze how special contract clauses can influence the implementation of construction projects and in particular the financial management of contractors. The authors propose a model for analyzing the impact of FIDIC contract conditions applied on a case study of five transport infrastructure projects.

  11. 78 FR 23935 - Federal Acquisition Regulation; Information Collection; Contractor Use of Interagency Fleet...

    Science.gov (United States)

    2013-04-23

    ...; Information Collection; Contractor Use of Interagency Fleet Management System Vehicles AGENCY: Department of... previously approved information collection requirement concerning contractor use of interagency fleet... Collection 9000- 0032, Contractor Use of Interagency Fleet Management System Vehicles, by any of the...

  12. 78 FR 64499 - Federal Acquisition Regulation; Submission for OMB Review; Contractor Use of Interagency Fleet...

    Science.gov (United States)

    2013-10-29

    ...; Submission for OMB Review; Contractor Use of Interagency Fleet Management System Vehicles AGENCY: Department... previously approved information collection requirement concerning contractor use of interagency fleet... comments identified by Information Collection 9000- 0032, Contractor Use of Interagency Fleet Management...

  13. Project management plan, Hazardous Materials Management and Emergency Response Training Center

    International Nuclear Information System (INIS)

    Borgeson, M.E.

    1994-01-01

    For the next 30 years, the main activities at the Hanford Site will involve the handling and cleanup of toxic substances. Thousands of workers involved in these new activities will need systematic training appropriate to their tasks and associated risks. This project is an important part of the Hanford Site mission and will enable the US Department of Energy (DOE) to meet high standards for safety. The Hazardous Materials Management and Emergency Response Training Center (HAMMER) project will construct a centralized regional training center dedicated to training hazardous materials workers and emergency responders in classrooms and with hands-on, realistic training aids representing actual field conditions. The HAMMER Training Center will provide a cost-effective, high-quality way to meet the Hanford Site training needs. The training center creates a partnership among DOE; government contractors; labor; local, state, and tribal governments; and selected institutions of higher education

  14. Construction project management handbook : September 2009.

    Science.gov (United States)

    2009-09-01

    The purpose of this Handbook is to provide guidelines for use by public transit agencies (Agencies) undertaking substantial construction : projects, either for the first time or with little prior experience with construction project management. It pr...

  15. Electronic Resources Management Project Presentation 2012

    KAUST Repository

    Ramli, Rindra M.

    2012-01-01

    This presentation describes the electronic resources management project undertaken by the KAUST library. The objectives of this project is to migrate information from MS Sharepoint to Millennium ERM module. One of the advantages of this migration

  16. Managing risks in the project pipeline.

    Science.gov (United States)

    2013-08-01

    This research focuses on how to manage the risks of project costs and revenue uncertainties over the long-term, and identifies significant : process improvements to ensure projects are delivered on time and as intended, thus maximizing the miles pave...

  17. Client's Constraining Factors to Construction Project Management

    African Journals Online (AJOL)

    factors as a significant system that constrains project management success of public and ... finance for the project and prompt payment for work executed; clients .... consideration of the loading patterns of these variables, the major factor is ...

  18. IT project management 30 steps to success

    CERN Document Server

    Doraiswamy, Premanand

    2011-01-01

    This pocket guide is designed to help IT project managers to succeed, and is based on the author's years of experience in IT project management. The guide's step-by-step approach will enable those new to IT project management, or intending to make a career in this field, to master the essential skills. For seasoned professionals, the pocket guide offers an invaluable concise reference guide.

  19. Early warnings : a phenomenon in project management

    OpenAIRE

    Nikander, Ilmari O.

    2002-01-01

    The emergence of Concurrent Engineering has caused growing demands on project management. The classic project management methods are often slow: problems may already exist when those methods are applied. The objective of the present study is to improve the opportunities of those responsible for a project's operational management to receive advance information about potential problems and final results through early warnings typical of the theory of weak signals by Igor Ansoff. The researc...

  20. Risk Management and Uncertainty in Infrastructure Projects

    DEFF Research Database (Denmark)

    Harty, Chris; Neerup Themsen, Tim; Tryggestad, Kjell

    2014-01-01

    The assumption that large complex projects should be managed in order to reduce uncertainty and increase predictability is not new. What is relatively new, however, is that uncertainty reduction can and should be obtained through formal risk management approaches. We question both assumptions...... by addressing a more fundamental question about the role of knowledge in current risk management practices. Inquiries into the predominant approaches to risk management in large infrastructure and construction projects reveal their assumptions about knowledge and we discuss the ramifications these have...... for project and construction management. Our argument and claim is that predominant risk management approaches tends to reinforce conventional ideas of project control whilst undermining other notions of value and relevance of built assets and project management process. These approaches fail to consider...

  1. Changing Pedagogical Means in Project Management

    DEFF Research Database (Denmark)

    Thorsteinsson, Uffe

    1998-01-01

    Presentation of two parts in a new concept for changing education in a university course in project management. First part concern running the couse as a project. Second part concern integrated use of Internet.......Presentation of two parts in a new concept for changing education in a university course in project management. First part concern running the couse as a project. Second part concern integrated use of Internet....

  2. Managing complex industrial change through projects

    OpenAIRE

    Perotti , Clément; Minel , Stéphanie; Benoit , Roussel; Jean , Renaud

    2010-01-01

    International audience; This paper proposes some elements showing that project is an appropriate way to manage organizational change, and that an individual change occurs during these phases. We suggest that project team should manage individual change in the framework of project for three main reasons. First, being at the crossroad of strategic and operational levels, project team is in the right position in organisation to "translate" organizational change to individuals, and vice-versa. Se...

  3. Project as a System and its Management

    Directory of Open Access Journals (Sweden)

    Jiří Skalický

    2017-06-01

    Full Text Available The contribution aims to describe project as a system, to define project control goal and strategy, control variables and their relationships. Three common control variables represented by the project triangle, are extended by two other important variables – project risk and quality. The control system consists of two components: social one – project manager and project team – and technical one – project dynamic simulation model as a decision making support of project manager in project milestones. In the project planning phase, the project baseline with planned controlled variables is created. In milestones after project launch, the actual values of these variables are measured. If the actual values deviate from planned ones, corrective actions are proposed and new baseline for the following control interval is created. Project plan takes into account the actual project progress and optimum corrective actions are determined by simulation, respecting control strategy and availability of resources. The contribution presents list of references to articles dealing with project as a system and its simulation. In most cases, they refer to the project control using the Earned Value Management method and its derivatives. Using of the dynamic simulation model for project monitoring and control, suggested in this contribution, presents a novel approach. The proposed model can serve as departure point to future research of authors and for development of appropriate and applicable tool.

  4. Fiscal Liability of State Contractors

    Directory of Open Access Journals (Sweden)

    Santiago Fajardo-Peña

    2017-06-01

    Full Text Available The State contract is one of the most important tools for public management. The formation, execution and liquidation of State contracts are also a potential cause of State patrimonial damages. Perhaps for this reason, many State contractors are prosecuted as if they were public spending managers. The question, however, is not as simple. The fiscal liability process has a qualified recipient: the fiscal manager. In this article, through a conceptual exposition and a case study, we identify the criterion for determining in which cases a State contractor acquires the function of controlling public funds and when he/she can be subjected to a fiscal liability.

  5. Lifecycle management for nuclear engineering project documents

    International Nuclear Information System (INIS)

    Zhang Li; Zhang Ming; Zhang Ling

    2010-01-01

    The nuclear engineering project documents with great quantity and various types of data, in which the relationships of each document are complex, the edition of document update frequently, are managed difficultly. While the safety of project even the nuclear safety is threatened seriously by the false documents and mistakes. In order to ensure the integrality, veracity and validity of project documents, the lifecycle theory of document is applied to build documents center, record center, structure and database of document lifecycle management system. And the lifecycle management is used to the documents of nuclear engineering projects from the production to pigeonhole, to satisfy the quality requirement of nuclear engineering projects. (authors)

  6. The Danish Agenda for Rethinking Project Management

    DEFF Research Database (Denmark)

    Svejvig, Per; Grex, Sara

    2016-01-01

    Purpose – The purpose of this paper is to analyze the similarities and differences between the Danish Re-thinking Project Management initiative named Project Half Double (PHD) and the rethinking project man-agement (RPM) research stream. The paper furthermore discusses how PHD and RPM can inspire...... ideas and local implementations. Findings – RPM and PHD share a focus on value creation, social processes, learning and complexity while PHD also focuses on lean thinking, agile thinking, front-end loading and leadership, which are largely topics beyond the RPM research stream. Originality...... a foundation for further development of both rethinking project management and Project Half Double....

  7. The Danish Agenda for Rethinking Project Management

    DEFF Research Database (Denmark)

    Svejvig, Per; Grex, Sara

    2016-01-01

    Purpose – The purpose of this paper is to analyze the similarities and differences between the Danish Re-thinking Project Management initiative named Project Half Double (PHD) and the rethinking project man-agement (RPM) research stream. The paper furthermore discusses how PHD and RPM can inspire...... a foundation for further development of both rethinking project management and Project Half Double....... each other in research and practice. Design/methodology/approach – This is an empirical paper based on collaborative research between in-dustry and researchers. PHD has developed principles and practices driven by industry consisting of 10 leading stars and the impact, leadership and flow (ILF) method...

  8. Your Project Management Coach Best Practices for Managing Projects in the Real World

    CERN Document Server

    Biafore, Bonnie

    2012-01-01

    A pragmatic approach to project management Many projects fail to deliver on time or on budget, or even to deliver a workable product that satisfies the customer. While good project management goes a long way towards ensuring success, managers often fail to follow the plans they implement. This unique guide helps you understand and successfully handle project management, once and for all. Covering practical ways to solve problems you'll typically face when managing actual projects, this pragmatic book takes you through a full project management lifecycle. You'll find ample tips, tricks, and bes

  9. Process-based software project management

    CERN Document Server

    Goodman, F Alan

    2006-01-01

    Not connecting software project management (SPM) to actual, real-world development processes can lead to a complete divorcing of SPM to software engineering that can undermine any successful software project. By explaining how a layered process architectural model improves operational efficiency, Process-Based Software Project Management outlines a new method that is more effective than the traditional method when dealing with SPM. With a clear and easy-to-read approach, the book discusses the benefits of an integrated project management-process management connection. The described tight coup

  10. PROJECT - RESOURCE MANAGEMENT OF INNOVATIONS IN EDUCATION: ANTHROPOLOGICAL PROJECTION

    Directory of Open Access Journals (Sweden)

    Galina Aleksandrovna Ignat’eva

    2015-08-01

    Full Text Available The purpose of the research was to denote a way to solve the problem of education mana-gement ΄s insufficient efficiency considered from the point of view of education opportunities to influence on the formation of mechanisms for sustainable development of society as a whole and its educational component. The concept «project-resource management of innovation in education» regarded on the basis of the anthropological project-transforming paradigm. Conceptually-categorical context presented by conceptual cluster composed of coordinated concepts «project», «resource», «educational reality», «organizational-resource potential», «project commonality». In the theoretical part of the study on the basis of analysis of the normative and exploratory approaches to educational innovations organization and management it was established the search approach ΄s leading role in the methodological substantiation of project-resource management. The study have indicated that in the presence of variable models of innovation management in education, corresponding to various predictive models of continuing education post-industrial society, project-resource management is an universal mechanism for the transition from separate innovation΄s precedents to the an authentic reality of innovative education. In the technological part of the study the main concern was to submit the project-resource management by the management goal’s system, each of which includes the specific management actions, projected results and the organizational forms. The project-resource management ΄s professional – activity context of the study showed evolution of managerial positions: an effective performer – an effective leader – strategist, implemented during the transition from directly directive management to the project management and further to the project-resource management. Based on the findings identified the key factors of initiatively-problem projects

  11. Adapting Project Management Practices to Research-Based Projects

    Science.gov (United States)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  12. SRP [Salt Repository Project] configuration management plan

    International Nuclear Information System (INIS)

    1987-01-01

    This configuration management plan describes the organization, policies, and procedures that will be used on the Salt Repository Project (SRP) to implement the configuration management disciplines and controls. Configuration management is a part of baseline management. Baseline management is defined in the SRP Baseline Procedures Notebook and also includes cost and schedule baselines. Configuration management is a discipline applying technical and administrative direction and surveillance to identify and document the functional and physical characteristics of an item, to control changes to those characteristics, to record and report change processing and implementation status, and to audit the results. Configuration management is designed as a project management tool to determine and control baselines, and ensure and document all components of a project interface both physically and functionally. The purpose is to ensure that the product acquired satisfies the project's technical and operational requirements, and that the technical requirements are clearly defined and controlled throughout the development and acquisition process. 5 figs

  13. AFSC Laboratory Management Information Requirements Project

    National Research Council Canada - National Science Library

    1982-01-01

    This document was developed under the auspices of the Laboratory IRM (LIRM) Management Working Group in response to AFSC Program Directive 0008-81-1, Management Information Requirement Project (23 February 1981...

  14. Practical project management: tips, tactics, and tools

    National Research Council Canada - National Science Library

    Levine, Harvey A

    2002-01-01

    ... Elements of Resource Management 4.2 Role-based Needs for Managing Resources in a Project-driven Organization 4.3 Resource Leveling and Games of Chance 4.4 Practical Resource Scheduling 117 119 12...

  15. Implementation of knowledge management approach in project oriented activities. Experience from simulator upgrade project

    International Nuclear Information System (INIS)

    Pironkov, L.

    2010-01-01

    Project specifics: Replacement of analogue process control system with Ovation®based Distributed Control System; Hybrid solution with simulated I&C logic and stimulated Human Machine Interface; Initial design ‐“turn‐key” project based on standard relationship “single customer –single contractor

  16. Systems approach to project risk management

    Energy Technology Data Exchange (ETDEWEB)

    Kindinger, J. P. (John P.)

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  17. INFORMATION TECHNOLOGY IN INVESTMENT PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Vjacheslav A. Kozlov

    2014-01-01

    Full Text Available In the article it is proved that use of information technology today is not only something innovative distinctive feature and competitive advantage for organizations, but it is a necessary condition for effective business. The article discusses the main functionality of financial-analytical system Project Expert as an effective tool of investment project management and instrument of business planning. The main advantages which organizations get from Project Expert program use are in detail considered. Thus in the article Project Expert is considered as the effective tool of investment project management which allows to receive a number of advantages and to carry out the qualitative analysis of projects.

  18. Site quality management of engineering projects

    International Nuclear Information System (INIS)

    Jiang Yiqun

    2008-01-01

    Site quality management of an engineering project of NPIC was introduced in this paper. Requirements on organization and management, interfaces, and management of interior and exterior communication were put forward, by description of quality planning, process management, process monitoring and summarizing for the engineering projects. By the management of personnel, specifications and procedures, and the control of equipment, material and work surroundings, not only the safety is ensured, but also the quality and schedule of the engineering project were guaranteed, and so the expected quality goals were achieved. (author)

  19. Spent Nuclear Fuel Project dose management plan

    International Nuclear Information System (INIS)

    Bergsman, K.H.

    1996-03-01

    This dose management plan facilitates meeting the dose management and ALARA requirements applicable to the design activities of the Spent Nuclear Fuel Project, and establishes consistency of information used by multiple subprojects in ALARA evaluations. The method for meeting the ALARA requirements applicable to facility designs involves two components. The first is each Spent Nuclear Fuel Project subproject incorporating ALARA principles, ALARA design optimizations, and ALARA design reviews throughout the design of facilities and equipment. The second component is the Spent Nuclear Fuel Project management providing overall dose management guidance to the subprojects and oversight of the subproject dose management efforts

  20. Design project management mode as the introduction

    International Nuclear Information System (INIS)

    Zhang Xiaoping

    2014-01-01

    This article consider nuclear power plant's current design schedule management mode as the introduction, analysis of current management in-depth, summed up the advantage and disadvantage of the existing management mode. It makes use of mature closed loop cycle project management, and submits progress tracking model assumptions. It also introduces the purpose and background of the progress automation model, the theoretical assumptions of the model, the design criteria and evaluation system of indicators of progress. Based on the achievement process model, this article mainly discusses the specific processes and key points of the project closed loop cycle, and the improvement of the process of project management. (author)

  1. The Management of Projects and Product Experimentation

    DEFF Research Database (Denmark)

    Lorenzen, Mark; Frederiksen, Lars

    2005-01-01

    The paper analyses management of product innovation in project-based industries, offering a view on management not only of firms, but also of markets. It first argues that projects are prominent in industries where the nature of consumer demand means that product innovation takes place...... as experimentation. Then, the paper argues that if skills needed for projects are very diverse and projects are complex, there are few internal managerial economies of projects, and the scope for management then transcends the boundaries of firms. In these cases, markets become organized in combinations of people......, contracts, and other institutions, in order to facilitate the coordination of market-based projects. While contracts play a role, a continuous, active role of knowledgeable managers (leaders and boundary spanners) is also often necessary. Such managers --- and thus (core parts of) whole industries...

  2. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    Science.gov (United States)

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  3. Project Manager Performance and the Decision to Backsource the Project Management Office

    Science.gov (United States)

    Lively, William R.

    2014-01-01

    This paper reviews a management decision of an Information Technology Outsource (ITO) provider to backshore the management oversight of its Project Management Office (PMO) after only one year of offshore operations. Governance is a term used in project management to refer to management oversight. The review is a quantitative analysis of existing…

  4. DIPLOMA PROJECT TEAM WORK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    V. S. Kruglyk

    2014-04-01

    Full Text Available During the work performance students should get the maximal approach to the process of real project execution, so the project should include the need to use the latest technology, integration of data or services with different developments, architecture design, interaction of the team members and others. Implementation of graduation projects is the useful activity for the acquisition and consolidation of key IT competencies. Since the task of educational projects is maximal close to real one, students participate almost in all typical stages of commercial product’s development, and do so successfully. This is also confirmed practically: students, who were actively engaged in some projects at the university, have key positions in IT companies of the city and country after that. The main objective of the paper is to describe the organization of a common group students’ work on a degree project, implementation peculiarity of such projects, recommendations for improving the quality of projects. Thus, the paper is devoted to the peculiarities of the joint students’ work on a project during diploma execution in IT specialties, as the final part of the acquisition and consolidation process of key IT competencies of future programmers. The problem of choosing work topic, project concept, work organization in a group, implementation process organization has been considered. Also the specific stages of software development have been considered: development of interface, choice of technology, product quality, project disposal to the next developers, project completion.

  5. Measures to improve nuclear power project management

    International Nuclear Information System (INIS)

    Ma Xinchao

    2012-01-01

    Focusing on correct application of ability level principle in setting organizational structure, the effective management system has been established, and 8 practical management regimes have been developed. Personnel training and management work shall be well done and enhanced. Experience feedback in construction management shall be well done for all systems. Exchange of construction and management techniques shall be actively carried out. All staff shall participate in safety management. KPI system is adopted for assessing stakeholders' project management method, and PDCA cycle is adopted for continued improved. Management level upgrading measures are proposed to ensure the smooth construction of nuclear power project. Setting forth and popularizing management theory can provide reference for and promote the smooth progress of various nuclear power projects. (author)

  6. Applied software risk management a guide for software project managers

    CERN Document Server

    Pandian, C Ravindranath

    2006-01-01

    Few software projects are completed on time, on budget, and to their original specifications. Focusing on what practitioners need to know about risk in the pursuit of delivering software projects, Applied Software Risk Management: A Guide for Software Project Managers covers key components of the risk management process and the software development process, as well as best practices for software risk identification, risk planning, and risk analysis. Written in a clear and concise manner, this resource presents concepts and practical insight into managing risk. It first covers risk-driven project management, risk management processes, risk attributes, risk identification, and risk analysis. The book continues by examining responses to risk, the tracking and modeling of risks, intelligence gathering, and integrated risk management. It concludes with details on drafting and implementing procedures. A diary of a risk manager provides insight in implementing risk management processes.Bringing together concepts ...

  7. Project Management Accountability System (PMAS) - Project Information and Data

    Data.gov (United States)

    Department of Veterans Affairs — The PMAS Dashboard provides a wide range of helpful data and information to assist you in project management and assessment. The drop down menu can be used to search...

  8. MANAGE INTERESTED PARTIES IN PROJECT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    BILOKON A. I.

    2016-04-01

    Full Text Available The success or failure of the project often depends on factors which related to the environment, surrounded by the project and which are outside of the direct control of the project manager. The concept of the project environment, the processes of environmental analysis of the project and the ways in which managers can identify potential problems and develop a plan of action to ensure the success of the project. The management strategy the main factors of the environment includes both organizational forms and measures which aimed at the development process. For alignment of the organizational forms of communication manager must have a clear idea: what kind of interested persons and their actions (functions need to monitor, and in what form to maintain communication (bilateral relations of interdependence. This information is key to the further construction of the formal organization that supports interaction, the definition of its functions, competencies, allocation of roles, areas of responsibility, instructions, forms and methods of work. Purpose. Summarize, analyze and form an idea of the potential of existing approaches to the management of the project environment. Object of study. Management processes of the persons, who interested in the project environment. Subject of study. Methods and tools for the project management environment.

  9. Wisdom for Building the Project Manager/Project Sponsor Relationship: Partnership for Project Success

    National Research Council Canada - National Science Library

    Patton, Nanette; Shechet, Allan

    2007-01-01

    .... This article discusses conventional roles and responsibilities of the project sponsor and then discusses strategies a project manager can employ to define boundaries to reduce role confusion and promote partnership to facilitate project success.

  10. Spent Nuclear Fuel Project Configuration Management Plan

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1995-01-01

    This document is a rewrite of the draft ''C'' that was agreed to ''in principle'' by SNF Project level 2 managers on EDT 609835, dated March 1995 (not released). The implementation process philosphy was changed in keeping with the ongoing reengineering of the WHC Controlled Manuals to achieve configuration management within the SNF Project

  11. Comparison of community managed projects and conventional ...

    African Journals Online (AJOL)

    Comparison of community managed projects and conventional approaches in rural water supply of Ethiopia. ... African Journal of Environmental Science and Technology ... This study aimed to compare Community Managed Projects (CMP) approach with the conventional approaches (Non-CMP) in the case of Ethiopia.

  12. Sustainability in Project Management: Reality Bites

    NARCIS (Netherlands)

    Gilbert Gilbert Silvius; Ron Schipper; Snezana Nedeski

    2012-01-01

    The relationship between project management and sustainable development is rapidly gaining interest from both practitioners and academics. Studies on the integration of the concepts of sustainability into project management, approach this topic mostly from a conceptual, logical or moral point of

  13. Nuclear power project management information system

    International Nuclear Information System (INIS)

    Zou Lailong; Zhang Peng; Xiao Ziyan; Chun Zengjun; Huang Futong

    2001-01-01

    Project Management Information System is an important infrastructure facility for the construction and operation of Nuclear Power Station. Based on the practice of Lingao nuclear power project management information system (NPMIS), the author describes the NPMIS design goals, system architecture and software functionality, points out the outline issues during the development and deployment of NPMIS

  14. Analyzing Project Management Maturity Level in Indonesia

    Directory of Open Access Journals (Sweden)

    Eliot Simangunsong

    2013-04-01

    Full Text Available Project management has been generally known and increasingly used by many organizations to gain competitive advantage. In this context, many studies have proposed maturity models to evaluate how project management knowledge has been deployed effectively and efficiently in or- ganization. As a developing country, Indonesia needs many development projects managed by government and private companies in different industries. Here, a study to assess project manage- ment maturity level in Indonesian businesses may bring insight about current business practices, which is important to speed up country development and business sustainability. Adapting the Project Management Maturity Model (ProMMM, a survey instrument has been developed and ap- plied to professionals from Jakarta and surrounding area. The result of analysis shows that con- struction and primary industry have a higher maturity level compare to manufacturing and servic- es. It is to be noted, however, that the level of project management understanding is low across in- dustries. This indicates that more quality project management training or certification is required to improve overall project management knowledge in Indonesia.

  15. Improvement of Construction Project Management Processes

    Directory of Open Access Journals (Sweden)

    Nazarko, J.

    2017-07-01

    Full Text Available The common denominator of the five papers published in the current edition of the Journal of Engineering, Project, and Production Management is the improvement of construction project management processes for effective use of resources. Execution of proper project management processes is widely recognized as a key success factor influencing likelihood of project success (Alleman, 2014. It is noticeable that four out of five papers in this issue of the Journal are authored or co-authored by Iranian researchers from the same Institute but their conclusions bear importance that cannot be limited to the authors’ region.

  16. Managing geotechnical risk on US design-build transport projects

    Directory of Open Access Journals (Sweden)

    Kevin McLain

    2014-03-01

    Full Text Available Awarding design-build (DB contracts before a complete subsurface investigation is completed, makes mitigating the risk of differing site conditions difficult, if not impossible. The purpose of the study was to identify effective practices for managing geotechnical risk in DB projects, and it reports the results of a survey that included responses from 42 of 50 US state departments of transportation and a content analysis of DB requests for proposals from 26 states to gauge the client’s perspective, as well as 11 structured interviews with DB contractors to obtain the perspective from the other side of the DB contract.  A suite of DB geotechnical risk manage tools is presented based on the results of the analysis. Effective practices were found in three areas: enhancing communications on geotechnical issues before final proposals are submitted; the use of project-specific differing site conditions clauses; and expediting geotechnical design reviews after award. The major finding is that contract verbiage alone is not sufficient to transfer the risk of changed site conditions. The agency must actively communicate all the geotechnical information on hand at the time of the DB procurement and develop a contract strategy that reduces/retires the risk of geotechnical uncertainty as expeditiously as possible after award.

  17. Reflexive project management in high-abition projects

    NARCIS (Netherlands)

    Loeber, Anne; Vermeulen, T.

    2016-01-01

    Purpose
    The Aristotelian notion of phronèsis inspired innovative work in the realm of project management as well as in literature on sustainability and societal transformations. We argue that both literatures may benefit from a dialogue between the two, especially in view of outlining project

  18. 48 CFR 970.5227-12 - Patent rights-management and operating contracts, for-profit contractor, advance class waiver.

    Science.gov (United States)

    2010-10-01

    ...; (B) Storage and disposal of civilian high-level nuclear waste and spent fuel technology; and (C... (including an English-language version if filed in a language other than English); (ii) An executed and... Contractor shall obtain patent agreements to effectuate the provisions of subparagraph (o)(1) of this clause...

  19. Client's constraining factors to construction project management ...

    African Journals Online (AJOL)

    This study analyzed client's related factors that constrain project management success of public and private sector construction in Nigeria. Issues that concern clients in any project can not be undermined as they are the owners and the initiators of project proposals. It is assumed that success, failure or abandonment of ...

  20. INTEGRATION OF PROGRESS STRATEGY IN PROJECT MANAGEMENT

    OpenAIRE

    Дмитрий Георгиевич БЕЗУГЛЫЙ

    2015-01-01

    The methods and tools of the developed project promotion, the planning system of promotion strategy are suggested; the main approaches used in the project promotion have been identified. The conclusions about the importance, necessity and role in the promotion of a holistic project management system have been made.

  1. Communication Scaffolds for Project Management in PBL

    Science.gov (United States)

    Sasaki, Shigeru; Arai, Masayuki; Takai, Kumiko; Ogawa, Mitsuhiro; Watanabe, Hiroyoshi

    2017-01-01

    In this study, the role-playing situation and the system requirement list are adopted into project-based learning classes to develop web applications. In the classes, the third-year undergraduate project managers communicate with the client of the project rolled by teachers on the Web bulletin board. These are expected to act as scaffolds to…

  2. The Impact of Project Management Maturity upon IT/IS Project Management Outcomes

    Science.gov (United States)

    Carcillo, Anthony Joseph, Jr.

    2013-01-01

    Although it is assumed that increasing the institutionalization (or maturity) of project management in an organization leads to greater project success, the literature has diverse views. The purpose of this mixed methods study was to examine the correlation between project management maturity and IT/IS project outcomes. The sample consisted of two…

  3. Project managing your simulator DCS upgrade

    International Nuclear Information System (INIS)

    Carr, S.

    2006-01-01

    The intention of this paper is to provide helpful information and tips for the purchaser with regard to the project management of a DCS upgrade for an existing nuclear power station operator-training simulator. This paper was written shortly after STS Powergen completed two nuclear power station simulator DCS projects in the USA. Areas covered by this paper are: - Contractual documents and arrangements; - Licence and Escrow agreements; - Liquidated damages; - Project management; - Project schedules and resources; - Monitoring progress; - Defect reporting; - DCS automation code; - Access to proprietary information; - Tips for project meetings; - Testing; - Cultural issues; - Training

  4. Project Management in the Finnish Music Industry

    OpenAIRE

    Hypén, Joel

    2009-01-01

    The term project is a widely used phrase in today’s working life. This thesis explains what project management theory is, how it has evolved through history and how it is applied in managing modern business projects in the contexts of the Finnish music business sector. The literature review contains a description of the key phases a project is typically organised in as well as the terms and tools used to plan and run a successful project. Through qualitative research means the thesis inves...

  5. The Fast Forward MBA in Project Management

    CERN Document Server

    Verzuh, Eric

    2011-01-01

    An updated and revised edition of the bestselling guide to managing projects For any professional responsible for coordinating projects among different departments, across executive levels, or with technical complexity, The Fast Forward MBA in Project Management offers comprehensive instruction on how to deliver on time and on budget. Get the step-by-step advice you need to find the right sponsor, clarify objectives, and set realistic schedules and budget projections. This Fourth Edition of the 200,000-copy bestseller now covers critical new topics including: software and IT projects, agile te

  6. Project management training : final report.

    Science.gov (United States)

    2011-01-01

    In 2005 the Indiana Department of Transportation (INDOT) went through a complete reorganization of its operations going from centralized to decentralized (District) management. This reorganization gave Districts autonomy to manage construction projec...

  7. Project management training : [technical summary].

    Science.gov (United States)

    2011-01-01

    In 2005, the Indiana Department of Transportation (INDOT) went through a complete reorganization of its operations going from centralized to decentralized (District) management. This reorganization gave Districts autonomy to manage construction proje...

  8. Making Things Happen Mastering Project Management

    CERN Document Server

    Berkun, Scott

    2008-01-01

    In the updated edition of this critically acclaimed and bestselling book, Microsoft insider Scott Berkun offers a collection of essays on field-tested philosophies and strategies for defining, leading, and managing projects. Based on his nine years of experience as a program manager for Microsoft's biggest projects, Berkun explains to technical and non-technical readers alike what it takes to get through a large software or web development project.

  9. Automated Procurement System (APS): Project management plan (DS-03), version 1.2

    Science.gov (United States)

    Murphy, Diane R.

    1994-01-01

    The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  10. Using electronic document management systems to manage highway project files.

    Science.gov (United States)

    2011-12-12

    "WisDOTs Bureau of Technical Services is interested in learning about the practices of other state departments of : transportation in developing and implementing an electronic document management system to manage highway : project files"

  11. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    Science.gov (United States)

    Raiman, Laura B.

    1992-12-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  12. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    Science.gov (United States)

    Raiman, Laura B.

    1992-01-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  13. Management evolution in the LSST project

    Science.gov (United States)

    Sweeney, Donald; Claver, Charles; Jacoby, Suzanne; Kantor, Jeffrey; Krabbendam, Victor; Kurita, Nadine

    2010-07-01

    The Large Synoptic Survey Telescope (LSST) project has evolved from just a few staff members in 2003 to about 100 in 2010; the affiliation of four founding institutions has grown to 32 universities, government laboratories, and industry. The public private collaboration aims to complete the estimated $450 M observatory in the 2017 timeframe. During the design phase of the project from 2003 to the present the management structure has been remarkably stable. At the same time, the funding levels, staffing levels and scientific community participation have grown dramatically. The LSSTC has introduced project controls and tools required to manage the LSST's complex funding model, technical structure and distributed work force. Project controls have been configured to comply with the requirements of federal funding agencies. Some of these tools for risk management, configuration control and resource-loaded schedule have been effective and others have not. Technical tasks associated with building the LSST are distributed into three subsystems: Telescope & Site, Camera, and Data Management. Each sub-system has its own experienced Project Manager and System Scientist. Delegation of authority is enabling and effective; it encourages a strong sense of ownership within the project. At the project level, subsystem management follows the principle that there is one Board of Directors, Director, and Project Manager who have overall authority.

  14. Project management in interior design services

    OpenAIRE

    Şahinoglu, Alp

    1997-01-01

    Ankara : Bilkent University, Department of Interior Architecture and Environmental Design and Institute of Fine Arts, 1997. Thesis (Master's) -- Bilkent University, 1997. Includes bibliographical references. In this study, the concept of project management is analyzed within the framework of interior design services. Project management has been defined as the managing and coordination of all human and physical resources, in order to accomplish the predetermined goals (aim of the proj...

  15. Project network-oriented materials management policy for complex projects

    DEFF Research Database (Denmark)

    Dixit, Vijaya; Srivastava, Rajiv K; Chaudhuri, Atanu

    2015-01-01

    This work devises a materials management policy integrated with project network characteristics of complex projects. It proposes a relative quantitative measure, overall criticality (OC), for prioritisation of items based on penalty incurred due to their non-availability. In complex projects...... managerial tacit knowledge which provides them enough flexibility to provide information in real form. Computed OC values can be used for items prioritisation and as shortage cost coefficient in inventory models. The revised materials management policy was applied to a shipbuilding project. OC values were......, practicing managers find it difficult to measure OC of items because of the subjective factors and intractable nature of penalties involved. However, using their experience, they can linguistically identify the antecedents and relate them to consequent OC. This work adopts Fuzzy Set Theory to capture...

  16. Project brief of pre-contract in project management

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim; Mohd Azmi Sidid Omar; Abdul Rahman Norazumin; Zakaria Dris; Abdul Murad Abu Bakar; Alwi Othman

    2010-01-01

    Project brief is a comprehensive document used in translating the user needs and requirement for the project implementation. This document is important for the designer as a main guidance towards establishing project details. Research shown that problem usually arises from not well-defined scope and needs by the user. With lack of information the designer tend to assume and interprets wrong translation. Other issues arise from project management are time, cost, budgetary, lack of communication and establishing quality management. Some ideas of improvement were gain by doing cross reference with JKR quality system management, workshop and brainstorming. It shows that an improvement of data collection system has to be integrating with some basic format details, drawings and declaration forms to be established. (author)

  17. Business Intelligence Support For Project Management

    OpenAIRE

    Muntean, Mihaela; Cabau, Liviu Gabiel

    2013-01-01

    With respect to the project management framework, a project live cycle consists of phases like: initiation, planning, execution, monitoring & control and closing. Monitoring implies measuring the progress and performance of the project during its execution and communicating the status. Actual performance is compared with the planned one. Therefore, a minimal set of key performance indicators will be proposed. Monitoring the schedule progress, the project budget and the scope will be possible....

  18. Comparisons on International Approaches of Business and Project Risk Management

    OpenAIRE

    Nadia Carmen ENE

    2005-01-01

    In this article we intend to present a comparative approach between three recognized international methodologies for risk management: RISKMAN, Project Management Institute Methodology-PMBoK and Project Risk Analysis and Management Guide (produced by Association for Project Management).

  19. SYSTEM DYNAMICS OF MANAGEMENT OF "UNFORESEEN CIRCUMSTANCES" OF THE PROJECT

    Directory of Open Access Journals (Sweden)

    Богдан Владимирович ГАЙДАБРУС

    2015-05-01

    Full Text Available Approaches for project contingency management through risk management and influence of stakeholders. Proposed system dynamic contingency project management model. The model describes the effects of various factors on the phase of project management through contingency.

  20. SYSTEM DYNAMICS OF MANAGEMENT OF "UNFORESEEN CIRCUMSTANCES" OF THE PROJECT

    OpenAIRE

    Богдан Владимирович ГАЙДАБРУС; Евгений Анатольевич ДРУЖИНИН

    2015-01-01

    Approaches for project contingency management through risk management and influence of stakeholders. Proposed system dynamic contingency project management model. The model describes the effects of various factors on the phase of project management through contingency.

  1. Framework for managing uncertainty in property projects

    NARCIS (Netherlands)

    Reymen, I.M.M.J.; Dewulf, G.P.M.R.; Blokpoel, S.B.

    2008-01-01

    A primary task of property development (or real estate development, RED) is making assessments and managing risks and uncertainties. Property managers cope with a wide range of uncertainties, particularly in the early project phases. Although the existing literature addresses the management of

  2. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  3. Project management for economical nuclear energy

    International Nuclear Information System (INIS)

    Majerle, P.P.

    2005-01-01

    The price of electricity is significantly influenced by the cost of the initial generation asset. The cost of the initial nuclear generation asset is significantly influenced by the design and construction duration. Negative variations in the cost and duration of actual design and construction have historically impacted the early relative economics of nuclear power generation. Successful management of plant design information will mitigate the risks of the design and construction of future nuclear plants. Information management tools that can model the integrated delivery of large complex projects enable the project owners to accurately evaluate project progress, as well as the economic impact of regulatory, political, or market activities not anticipated in the project execution plan. Significant differences exist in the electrical energy markets, project delivery models, and fuel availability between continents and countries. However, each market and project delivery model is challenged by the need to produce economical electrical energy. The information management system presented in this paper provides a means to capture in a single integrated computerized database the design information developed during plant design, procurement, and construction and to allow this information to be updated and retrieved in real time by all project participants. Utilization of the information management system described herein will enable diverse project teams to rapidly and reliably input, share, and retrieve power plant information, thereby supporting project management's goal to make good on its commitment to the economic promise of tomorrow's nuclear electrical power generation by achieving cost-effective construction. (authors)

  4. 48 CFR 645.608 - Screening of contractor inventory.

    Science.gov (United States)

    2010-10-01

    ... inventory. 645.608 Section 645.608 Federal Acquisition Regulations System DEPARTMENT OF STATE CONTRACT MANAGEMENT GOVERNMENT PROPERTY Reporting, Redistribution, and Disposal of Contractor Inventory 645.608 Screening of contractor inventory. ...

  5. Effective Safety Management in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.

  6. Project management of radwaste retrofits

    International Nuclear Information System (INIS)

    Vaught, D.L.

    1988-01-01

    Many utilities are finding it necessary to provide additional radioactive waste processing facilities at operating or nearly completed nuclear stations in order to accommodate the ever-changing regulatory, political and socio-economic environment in which we operate. This paper describes the project approach taken at Duke Power Company to provide a comprehensive radioactive waste processing facility at Oconee Nuclear Station. Following a historical perspective, the philosophy and mechanics of the project team are discussed. The goal of the project team was to provide a facility which could meet the liquid and solid radioactive waste processing needs of Oconee within the restraints of a utility budget and schedule. The unique quality of the project team approach was the integral involvement of all of the necessary departments in every part of the design, construction and start-up phases. The project team thereby utilized feedback from over thirty reactor years of operational experience. The remainder of the paper provides examples of the problems encountered and their resolution (eg. equipment layout, materials handling, vendor improvements and regulatory changes all required design-in-progress changes). It has been the integration and concentration of the diverse resources of a large utility into a cross-departmental team which has allowed the timely resolution of the necessary changes. This same philosophy is being applied to the facility start-up program and to other major projects at Duke Power Company

  7. Automated transportation management system (ATMS) software project management plan (SPMP)

    Energy Technology Data Exchange (ETDEWEB)

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  8. Bottomland Hardwood Ecosystem Management Project

    Science.gov (United States)

    John A. Stanturf; Calvin E. Meier

    1994-01-01

    Federal agency approaches to land management are undergoing a shift from parcel-specific concerns toward a more holistic, ecosystem management approach. Southern bottomland hardwood ecosystems provide important environmental services and commodity goods (Wharton et al. 1982), yet much of our knowledge of these systems comes from anecdotal information. The Bottomland...

  9. Identity and the Management Project

    DEFF Research Database (Denmark)

    Jørgensen, Kenneth Mølbjerg; Dehlin, Erlend

    The paper discusses the concept of identity in relation to management. We take our starting point in Wittgenstein’s concept language games. We argue that identity is a question of using linguistic tools to construct reality. Two elements of the language game metaphor are central here: rules...... and family resemblance. As such, managing identity in organizations is closely linked to rules and family resemblance. Organizations manage identity through the definition of norms and values for right or wrong, appropriate or inappropriate, to name but a few. Norms and values are important as reference...... points for constructing identities. Managing identity has become more important because the rules-of-the-game have become more unstable. Managing identity is important if the bonds between individuals and organizations are to be sustained. But this task is contradictory and paradoxical of its very nature...

  10. Nuclear project management experience in Korea

    International Nuclear Information System (INIS)

    Jae-Pung Jeon

    1987-01-01

    Korea Electric Power Corporation (KEPCO) has been dereloping nuclear power steadily over last 30 years to support effective economic growth of the nation with cheap electric power. In the course of development, KEPCO has experienced various project management patterns diverging from turn-key contracts with foreign vendors to non-turnkey with local affiliates. To culative own project management capabilities, one has to pay continuous efforts for better management systems development and manpower training. KEPCO is ready to share its priceless experiences gained over last three decades of nuclear project operation with any developing nation. (Liu)

  11. Management of projects for energy efficiency

    Directory of Open Access Journals (Sweden)

    Vuković Miodrag M.

    2014-01-01

    Full Text Available In an effort to lower operating costs and improve competitiveness, many organizations today are preparing projects in the field of energy saving. On the other hand, companies that provide energy services and implement these projects, need to build competences in this area to well manage the projects which are subject to energy savings and by this to justify the confidence of investors. This paper presents research that shows the most important factors for the development of local capacity in project management in the field of energy efficiency.

  12. Strategic management of HLW repository projects

    International Nuclear Information System (INIS)

    Bartlett, J.W.

    1984-01-01

    This paper suggests an approach to strategic management of HLW repository projects based on the premise that a primary objective of project activities is resolution of issues. The approach would be implemented by establishing an issues management function with responsibility to define the issues agenda, develop and apply the tools for assessing progress toward issue resolution, and develop the issue resolution criteria. A principal merit of the approach is that it provides a defensible rationale for project plans and activities. It also helps avoid unnecessary costs and schedule delays, and it helps assure coordination between project functions that share responsibilities for issue resolution

  13. Competency model for the project managers of technical projects

    Science.gov (United States)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  14. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    Science.gov (United States)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  15. Accounting calculations problems with suppliers and contractors

    Directory of Open Access Journals (Sweden)

    Tikholaz I.A.

    2016-12-01

    Full Text Available in the article an order of accounting reflection of payments with suppliers and contractors are researched and ways of enhancement of accounting calculations process development with the purpose of management decisions optimization for their implementation are offered. Theoretical bases of intraeconomic control of settlings with suppliers and contractors are developed.

  16. Project management at Heysham II and Torness

    International Nuclear Information System (INIS)

    Taylor, D.

    1987-01-01

    The National Nuclear Corporation (NNC) have contracts from the Central Electricity Generating Board (CEGB) and the South of Scotland Electricity Board (SSEB) for the design and construction of the AGR Nuclear Power Stations at Heysham II and Torness. Within these contracts, procurement and construction of the various components making up the Nuclear Island are managed by NNC as agents of the two generating boards. Other responsibilities are for the design of the whole station, preparation of the safety case and on-site management of the Nuclear Island at both stations. Additional responsibilities are included in the Torness contract such that NNC manage almost the whole of the site works. Construction of both stations started in August 1980 and power raising is expected to commence on time at the end of this year. Both stations are close to the original budget. This paper examines factors which have contributed to this success including the relationship between NNC, the contractors, clients and the safety authority. (author)

  17. Globalization And Knowledge Management In Projects

    Directory of Open Access Journals (Sweden)

    Bubel Dagmara

    2015-06-01

    Full Text Available Knowledge management is a field of management dealing with the use of knowledge, methods, and tools to effectively coordinate complex and unique projects. In accordance with this definition, project knowledge can be treated as a useful resource of information that allows projects to be implemented in compliance with its objectives: time, costs, and quality of results. Knowledge in the activity of an organization, including in the implementation of projects, has for many years been an area of interest to researchers, who confirmed its key importance for building permanent competitive advantages of companies and enterprises. In project management, this issue takes on a new character, as it is transferred to the field of dynamic, time restricted, temporary, and team-implemented projects. The aim of this paper is to present the results of a survey regarding the use of practices of knowledge management in projects in international organizations and to show that the concept of knowledge management in projects is a tool conducive to spreading the process of globalization.

  18. Risk management methodology for RBMN project

    International Nuclear Information System (INIS)

    Borssatto, Maria F.B.; Tello, Cledola C.O.; Uemura, George

    2013-01-01

    RBMN Project has been developed to design, construct and commission a national repository to dispose the low- and intermediate-level radioactive wastes from the operation of nuclear power plants and other industries that use radioactive sources and materials. Risk is a characteristic of all projects. The risks arise from uncertainties due to assumptions associated with the project and the environment in which it is executed. Risk management is the method by which these uncertainties are systematically monitored to ensure that the objectives of the project will be achieved. Considering the peculiarities of the Project, that is, comprehensive scope, multidisciplinary team, apparently polemic due to the unknowing of the subject by the stake holders, especially the community, it is being developed a specific methodology for risk management of this Project. This methodology will be critical for future generations who will be responsible for the final stages of the repository. It will provide greater guarantee to the processes already implemented and will maintain a specific list of risks and solutions for this Project, ensuring safety and security of the repository throughout its life cycle that is the planned to last at least three hundred years. This paper presents the tools and processes already defined, management actions aimed at developing a culture of proactive risk in order to minimize threats to this Project and promote actions that bring opportunities to its success. The methodology is based on solid research on the subject, considering methodologies already established and globally recognized as best practices for project management. (author)

  19. An Approach for Implementation of Project Management Information Systems

    Science.gov (United States)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  20. Belene NPP project configuration management

    International Nuclear Information System (INIS)

    Matveev, A.

    2009-01-01

    The configuration management includes: change identification; change assessment; change coordination; change approval or rejection; Change introduction. One of the main tasks while implementing the above processes is the analysis of the effect of one change upon all the related elements

  1. Contingency Contractor Optimization Phase 3 Sustainment Software Design Document - Contingency Contractor Optimization Tool - Prototype

    Energy Technology Data Exchange (ETDEWEB)

    Durfee, Justin David; Frazier, Christopher Rawls; Bandlow, Alisa; Jones, Katherine A

    2016-05-01

    This document describes the final software design of the Contingency Contractor Optimization Tool - Prototype. Its purpose is to provide the overall architecture of the software and the logic behind this architecture. Documentation for the individual classes is provided in the application Javadoc. The Contingency Contractor Optimization project is intended to address Department of Defense mandates by delivering a centralized strategic planning tool that allows senior decision makers to quickly and accurately assess the impacts, risks, and mitigation strategies associated with utilizing contract support. The Contingency Contractor Optimization Tool - Prototype was developed in Phase 3 of the OSD ATL Contingency Contractor Optimization project to support strategic planning for contingency contractors. The planning tool uses a model to optimize the Total Force mix by minimizing the combined total costs for selected mission scenarios. The model optimizes the match of personnel types (military, DoD civilian, and contractors) and capabilities to meet mission requirements as effectively as possible, based on risk, cost, and other requirements.

  2. Strategically oriented management and controlling of resource intensive projects

    International Nuclear Information System (INIS)

    Kemmeter, Sascha

    2015-01-01

    The book on strategically oriented management and controlling of resource intensive projects covers the following issues: frame of project management and project controlling, classification of the decommissioning of nuclear facilities as resource intensive projects, research design for case studies, results of the study of project management specific characteristics of decommissioning, reference model for the project management of nuclear facility decommissioning.

  3. Operator/contractor relationships

    International Nuclear Information System (INIS)

    Smith, J.R.; Kidwell, C.K.; Unger, V.E.; Fercho, E.; Helmer, C.M.

    1992-01-01

    In May 1988, Shell Western E and P Inc. (SWEPI) and partners Elf Aquitaine Petroleum and Conoco Inc. signed a letter of intent with Canadian Marine Drilling Ltd. (Canmar) for provision of exploratory drilling and marine services on leases in OCS Lease Sale 109 in the Chukchi Sea, Alaska. The 5450 blocks offered in the remote sale area west of Point Barrow ranged from 3 to 240 miles (5 to 380 km) offshore in water depths from 26 to 263 feet (8 to 80 m). The principal interest tracts were at least 75 miles (120 km) offshore and north of 70 degrees N latitude. The remoteness and total lack of any oilfield infrastructure required considerable planning and coordination between Operator and Contractor in order to carry out the three-year drilling program efficiently and safely in an environmentally harsh and, at the same time, sensitive area. SWEPI and Canmar developed a close working relationship from the start of the project through a number of participative approaches to the problems that had to be solved. This paper reports that these included strong reliance on operational planning meetings, post-season analyses, and an overall emphasis on the teamwork required of both parties to carry out the first-ever drilling program in the Chukchi Sea. This approach led to a very successful operation for both parties and emphasizes the positive benefits achievable when Operator and Contractor work as a team

  4. Agile Project Management for e-Learning Developments

    Science.gov (United States)

    Doherty, Iain

    2010-01-01

    We outline the project management tactics that we developed in praxis in order to manage elearning projects and show how our tactics were enhanced through implementing project management techniques from a formal project management methodology. Two key factors have contributed to our project management success. The first is maintaining a clear…

  5. Project safety studies - nuclear waste management (PSE)

    International Nuclear Information System (INIS)

    1981-10-01

    The project 'Safety Studies-Nuclear Waste Management' (PSE) is a research project performed by order of the Federal Minister for Research and Technology, the general purpose of which is to deepen and ensure the understanding of the safety aspects of the nuclear waste management and to prepare a risk analysis which will have to be established in the future. Owing to this the project is part of a series of projects which serve the further development of the concept of nuclear waste management and its safety, and which are set up in such a way as to accompany the realization of that concept. This report contains the results of the first stage of the project from 1978 to mid-1981. (orig./RW) [de

  6. Risk management integration into complex project organizations

    Science.gov (United States)

    Fisher, K.; Greanias, G.; Rose, J.; Dumas, R.

    2002-01-01

    This paper describes the approach used in designing and adapting the SIRTF prototype, discusses some of the lessons learned in developing the SIRTF prototype, and explains the adaptability of the risk management database to varying levels project complexity.

  7. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Log in or Register to get access to full text downloads. ... (decision-making, problem-solving, listening, verbal competency, motivation, persuasion, ... Keywords: Communication skills and leadership model, construction project management, ...

  8. Project Management and Total Quality Management : Complementary or confused?

    Directory of Open Access Journals (Sweden)

    Selma KATLANE BEN MLOUKA

    2009-01-01

    Full Text Available Quality management and project management appear as themes of strategic management today. The adoption of the project management constitutes a new way in organizing the production. It helps to cope with the complexity of the environment, to reduce the product life cycles and to make working arrangements more flexible. It should also adapt to the ICT revolution and restructuring of enterprises due to the dematerialisation of structures and transactions. Quality management, applied to more operations and strongly influenced by the quantitative approach seems compatible with project management. Indeed, the two paradigms emphasize the importance of customer satisfaction, teamwork, the role of leadership and the continuous improvement of processes and products. This paper aims to revisit the principles of relationship between total quality management and project management. Having shown the importance of incorporating fine patterns and project quality in business organization, we will explain how the ability to generate, select and conduct projects in an oriented accountability of management is able to enroll in a total quality.

  9. Managing Projects with CSR in mind

    DEFF Research Database (Denmark)

    Kampf, Constance; Thomsen, Christa

    2008-01-01

    This paper examines project management as a place where CSR can be operationalized, focusing particularly on project conception processes and co-constructing CSR knowledge with emergent tertiary stakeholders. Two projects which dealt with emergent tertiary stakeholders differently are examined.......  First, the Finnish company Metsa-Botnia's paper pulp plant in Uruguay is examined as a project in which a tertiary stakeholder, Argentina, emerged during the early stages of the project.  Argentina requested dialogue about the project conception and Metsa Botnia did not include them.  In contrast......, the Danish emergency services company Falck A/S's project on redefining CSR is offered as an example of a project transformed through dialogue with the emergent tertiary stakeholder, the county of Aarhus.   To analyze the cases, the paper combines Morsing & Schultz's (2006) dialectic CSR strategy based...

  10. Information Technology in Engineering and Project Management

    Directory of Open Access Journals (Sweden)

    Chien-Ho Ko

    2017-01-01

    Full Text Available Information Technology (IT can be regarded as the use of computers to store, analyze, and manipulate data (Daintith, 2009. With the rapid development of personal computers, IT has been widely applied in nearly every field (Davenport, 2013. This issue presents five papers covering engineering and project management, three of which focus on the application of IT to solve engineering and project management issues, while one presents research into public private partnerships, and another into cash flow forecasting.

  11. Proceedings of the Canadian Institute conference on supply chain management in the oil and gas industry : major capital construction projects, maintenance, repair and operations

    International Nuclear Information System (INIS)

    2005-01-01

    Many companies are now being forced to focus on careful budgeting to ensure that the capital costs of large-scale construction projects do not exceed their budgets. Operators are now investigating the role of supply chain management in reducing project costs. This conference provided a forum for the discussion of issues related to large construction projects for supply chain management in the oil and gas industry. Participants at the conference discussed methods of negotiating with contractors in order to manage higher prices for steel and other commodities. Best practices for maintaining effective purchaser-contractor relations were discussed along with cost benchmarks in contracts and management planning techniques for supply chain processes. The benefits of adopting vendor-managed inventory systems were also examined. Sourcing strategies were presented and issues related to transportation were reviewed along with various planning models. The conference featured 16 presentations. tabs., figs

  12. Cultural differences in Research project management

    Science.gov (United States)

    Barbier, Michele

    2016-04-01

    Scientific Projects today have increased in complexity, requiring multidisciplinarity, and requiring a mix of diverse individuals from different countries who must be integrated into an effective project. Effective team building is one of the prime responsibilities of the project manager. When the project is supported by a funding, the integration and the implication of the different partners are quite easy. Particularly when partners are developing high-performing teams. However, management of research project requires further skills when the budget is not very high and/or when partners are from non-European countries and are not using the same vocabulary. The various cultures, values, beliefs and social usages, particularly with Mediterranean countries cause a special style of communication for an individual or group of individuals. This communication style participates in the success of the project and encompasses a lot of diplomatic skills which will be highlighted.

  13. Project Management Plan for Material Stabilization

    International Nuclear Information System (INIS)

    SPEER, D.R.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617/Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides

  14. Estimation of efficiency project management

    Directory of Open Access Journals (Sweden)

    Novotorov Vladimir Yurevich

    2011-03-01

    Full Text Available In modern conditions, the effectiveness of the enterprises all in a greater degree depends on methods of management and business dealing forms. The organizations should choose the most effective for themselves strategy of management taking into account the existing legislation, concrete conditions of activity, financial and economic, investment potential and development strategy. Introduction of common system of planning and realization of strategy of the organization, it will allow to provide even development and long-term social and economic growth of the companies.

  15. Augmenting SCA project management and automation framework

    Science.gov (United States)

    Iyapparaja, M.; Sharma, Bhanupriya

    2017-11-01

    In our daily life we need to keep the records of the things in order to manage it in more efficient and proper way. Our Company manufactures semiconductor chips and sale it to the buyer. Sometimes it manufactures the entire product and sometimes partially and sometimes it sales the intermediary product obtained during manufacturing, so for the better management of the entire process there is a need to keep the track record of all the entity involved in it. Materials and Methods: Therefore to overcome with the problem the need raised to develop the framework for the maintenance of the project and for the automation testing. Project management framework provides an architecture which supports in managing the project by marinating the records of entire requirements, the test cases that were created for testing each unit of the software, defect raised from the past years. So through this the quality of the project can be maintained. Results: Automation framework provides the architecture which supports the development and implementation of the automation test script for the software testing process. Conclusion: For implementing project management framework the product of HP that is Application Lifecycle management is used which provides central repository to maintain the project.

  16. Which Type of Project Manager are You?

    DEFF Research Database (Denmark)

    2017-01-01

    Which type of project manager best describes you — are you a prophet, gambler, expert or executor? Take this twelve-question quiz to find out right now. There are no wrong answers, but the result may surprise you — and understanding your personal strength can help guide your career and project...

  17. Electronic Resources Management Project Presentation 2012

    KAUST Repository

    Ramli, Rindra M.

    2012-11-05

    This presentation describes the electronic resources management project undertaken by the KAUST library. The objectives of this project is to migrate information from MS Sharepoint to Millennium ERM module. One of the advantages of this migration is to consolidate all electronic resources into a single and centralized location. This would allow for better information sharing among library staff.

  18. Waste management project technical baseline description

    International Nuclear Information System (INIS)

    Sederburg, J.P.

    1997-01-01

    A systems engineering approach has been taken to describe the technical baseline under which the Waste Management Project is currently operating. The document contains a mission analysis, function analysis, requirement analysis, interface definitions, alternative analysis, system definition, documentation requirements, implementation definitions, and discussion of uncertainties facing the Project

  19. Graduate Student Project: Employer Operations Management Analysis

    Science.gov (United States)

    Fish, Lynn A.

    2008-01-01

    Part-time graduate students at an Association to Advance Collegiate Schools of Business-accredited college complete a unique project by applying operations management concepts to their current employer. More than 92% of 368 graduates indicated that this experiential project was a positive learning experience, and results show a positive impact on…

  20. The impact of sustainability on project management

    NARCIS (Netherlands)

    Adri Köhler; Gilbert Gilbert Silvius; Jasper van den Brink

    2011-01-01

    Chapter 11 in The Project as a Social System: Asia-Pacific Perspectives on Project Management. Sustainability is one of the most important challenges of our time. How can we develop prosperity without compromising the life of future generations? Companies are integrating ideas of sustainability in

  1. The impact of sustainability on project management

    NARCIS (Netherlands)

    Adri Köhler; Jasper van den Brink; Gilbert Gilbert Silvius

    2012-01-01

    Full text via link Chapter 11 in The Project as a Social System: Asia-Pacific Perspectives on Project Management Sustainability is one of the most important challenges of our time. How can we develop prosperity without compromising the life of future generations? Companies are integrating ideas of

  2. Decommissioning project management unit started its activities

    International Nuclear Information System (INIS)

    Medeliene, D.

    2002-01-01

    The Decommissioning Project Management Unit team comprises western experts as well as experts from INPP Decommissioning Service who all work as a single team. The DPMU will develop the Final Decommissioning Plan and a more detailed Decommissioning Project, which will describe how the plant will be removed from service and safely decommissioned

  3. 77 FR 3503 - Guam Military Base Realignment Contractor Recruitment Standards

    Science.gov (United States)

    2012-01-24

    ... Contractor Recruitment Standards AGENCY: Employment and Training Administration, Labor. ACTION: Notice... issuing this notice to announce the recruitment standards that construction contractors are required to... contractors engaged in construction projects related to the realignment of U.S. military forces from Okinawa...

  4. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Riddle, Donna L.

    2007-05-03

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, “Quality Assurance Requirements,” ANSI/ASQC E4-2004, “Quality Systems for Environmental Data and Technology Programs – Requirements with Guidance for Use,” and ISO 14001-2004, “Environmental Management Systems,” have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, “Quality Assurance Program,” identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, “QA Program Implementation,” identifies the TAC organizations that have responsibility for

  5. Management of delayed nuclear power plant projects

    International Nuclear Information System (INIS)

    2005-01-01

    The IAEA assists the management of organizations responsible for Nuclear Power Plant Projects with significant delays with respect to the originally scheduled commercial operation. Several Member States have Nuclear Power Plant Projects with delays of five or more years with respect to the originally scheduled commercial operation. The degree of conformance with original construction schedules shows large variations due to several issues, including financial, economic and public opinion factors. Solving the special difficulties related with a delayed NPP project is problematic and dependent on the particular country situation. However it is not regarded as an isolated national problem but as a significant issue with a number of difficulties shared by several Member States. The IAEA collects information and supports the management of delayed NPP projects by identifying main common issues, gathering available experience and addressing specific needs. On this background the IAEA is in the position to provide unique impartial assistance based upon best international practices. This enables Member States to maintain readiness for resuming the project construction when the conditions permit and to strengthen management's abilities for the completion of the project. The IAEA's service is tailored to the needs and requirements of the requesting organization, implemented on-site by international experts and addresses areas such as project control measures, human resources, updating to technological and regulatory requirements, project data, nuclear safety review, physical protection and nuclear security and preparation to resume project construction and operation

  6. Project management and performance management: potential transdisciplinary contributions

    Directory of Open Access Journals (Sweden)

    Gerrit van der Waldt

    2012-12-01

    Full Text Available As project management and performance management as management applications gain momentum in public sector settings, the question often arise as to if, how, and when these applications should complement each other in various policy implementation and service delivery initiatives. Answers to this question should be sought from various vantage points or perspectives. These vantage points may range from macro, meso, micro as well as theoretical-methodological perspectives. The purpose of this paper is to unlock the potential for transdisciplinary contributions between Project Management and Performance Management by focusing on the methodologies, functional areas, and practical applications of both management disciplines. It is argued that the respective methodologies and their processes should be unpacked to identify the timing or moment when each discipline could, and should, make a contribution to the success of the other. This will add value to the theoretical underpinnings and practical applications of both study domains in the public sector. The respective contributions are illustrated by means of application realities of both management practices in the South African Public Service. Keywords: project management, performance management, Public Sector applications, transdisciplinarity Disciplines: project management, performance management

  7. The Human Element of Project Management

    Science.gov (United States)

    Gillard, Sharlett

    2017-01-01

    Much research and dialogue have been published about project management. Studies have been conducted regarding the impact of size, member location, gender composition, cross-functional structure, stakeholder influence, confidence issues, technology usage, management style, generational differences, technical expertise vs. people skills, and a…

  8. Project-based organizing and strategic management

    DEFF Research Database (Denmark)

    very different industries such as management consulting, engineering or entertainment. Contributors analyze PBOs as firms, units or networks of firms set up to complete a specific assignment, as well as address the evolution from traditional operations-driven project management, to the strategic role...

  9. Spent Nuclear Fuel Project Document Management Plan

    International Nuclear Information System (INIS)

    Connor, M.D.; Harizison, G.L.; Rice, W.C.

    1995-12-01

    The SNF Project Document Management Plan identifies and describes the currently available systems and processes for implementing and maintaining an effective document control and records management program. This program governs the methods by which documents are generated, released, distributed, maintained current, retired, and ultimately disposed

  10. COORDINATES OF A RISK MANAGEMENT PROJECT

    OpenAIRE

    ALEXANDRU OLTEANU; MĂDĂLINA ANTOANETA RĂDOI

    2013-01-01

    High risk – high benefit: a well-known correlation both in the economic field and in the day-to-day life. Another correlation, on which this article is based: large project – numerous participants – increased risks and other malfunctions. The risk management concept is challenged by those projects and is forced to find the most adequate “customized” ways for each project at its turn. In this respect, the assessment of management has followed the trend of the last three decades, marked by movi...

  11. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  12. When Serious Project Management is a Critical Business Requirement

    Science.gov (United States)

    Jansma, P. A.; Gibby, L.; Chambers, C.; Joines, J.; Egger, R.

    2000-01-01

    When serious project management is a critical business requirement, project managers need to integrate cost, schedule and technical scope of work across the project, and apply earned value management (EVM).

  13. Using facilitative skills in project management

    DEFF Research Database (Denmark)

    Rasmussen, Lauge Baungaard; Hansen, Mette Sanne; Jacobsen, Peter

    2013-01-01

    Project management can be seen as a profession, discipline and conceptual framework. It has been developed from different fields, including military engineering, mechanical engineering, social sciences and construction. During recent decades, there has been a number of challenges as to its efficacy...... cooperation, mediated by interconnected and diversified systems, is becoming more and more common. These relatively new forms of interaction imply new demands on skills and methods facilitating project cooperation within and among various organizations. Given the pervasiveness of these demands, project...... managers are frequently finding themselves in situations where using facilitating skills is not an option, but a requirement. Facilitation is to be viewed as a process of ‘obstetric’ aid to meet the challenges of coping with the changing conditions for project management described briefly above...

  14. Development of advanced JGIS considering qualify management and project management

    International Nuclear Information System (INIS)

    Kawachi, Susumu; Ohi, Takao; Kawamura, Makoto; Ishihara, Yoshinao; Ebina, Takanori

    2008-03-01

    A system for managing and integrating the technical information of R and D was developed (JGIS: JAEA Geological Disposal Information Integration System). The subjects are to improve the usability as the system and the usability to record the information and the data in order to display the function of the system sufficiently and in order to enable the practical use of the system. In this study the aims are to display the function of JGIS and to enable the researchers as the users to recognize the significance of using JGIS. We built the conceptual design in order to implement the function of quality management and project management to JGIS. We considered that researchers could access the portal site of the research projects which were set as the WBS (Work Breakdown Structure) items and could confirm which WBS item the research project belonged to in the whole plan. We also considered that the research projects could be managed by using the conformity assessment sheets which were adopted for the quality management. The appendix contains the example of application of real projects to JGIS and the user's manual of JGIS (Example of a study of potential impact of natural phenomena). We demonstrated that researchers could confirm which WBS item the research project related to in JGIS and could manage the quality of the research projects by using the conformity assessment sheets in JGIS. (author)

  15. A Communications Approach to Teaching Project Management

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    2012-01-01

    in the Bachelor of Marketing and Management Communication at Aarhus University is examined and analyzed. The presence of the three Design Science Research Cycles combined with both process and product, highlights the critical role of communication in both understanding Project Management and applying Design...... to both frame the learners’ audience for Project Management Writing assignments, and to provide a concrete organizational context to aid in communication practices such as stakeholder analysis, and the development of a critical internal monitor for quality in the learner’s mind. The relevance of Design...

  16. Analysis of return on investment for Naval air station fallon energy project Alternatives

    Science.gov (United States)

    2017-06-01

    Manager (Justin Sielsch, personal communication ). Lack of in-house skill related to HVAC retrofits would require substantial effort by Public Works ...bill. An ESPC project is financed by the contractor performing the work . The contractor guarantees a certain annual energy savings because of their... work . The Navy installation uses the annual savings from its energy budget to pay back the contractor. ESPCs include contractor performance

  17. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  18. Application of PRINCE2 Project Management Methodology

    Directory of Open Access Journals (Sweden)

    Vaníčková Radka

    2017-09-01

    Full Text Available The methodology describes the principle of setting a project in PRINCE2 project management. The main aim of the paper is to implement PRINCE2 methodology to be used in an enterprise in the service industry. A partial aim is to choose a supplier of the project among new travel guides. The result of the project activity is a sight-seeing tour/service more attractive for customers in the tourism industry and a possible choice of new job opportunities. The added value of the article is the description of applying the principles, processes and topics of PRINCE2 project management so that they might be used in the field.

  19. Strategic leadership of portfolio and project management

    CERN Document Server

    Kloppenborg, Timothy J

    2014-01-01

    As an executive in today's economy, your organization may have limited resources and bench strength. How can you and other leaders make the most of your company's assets? This book will instruct you and your leadership teams on implementing strategy through identifying, selecting, prioritizing, resourcing, and governing an optimal combination of projects and other work. Inside, you'll learn how to sponsor every project stage, as well as instruct your project managers and direct reports to follow your lead. Detailed advice is given for project management competency on utilizing input from customers, employees, and processes. Much of your organization's work is probably dependent on information technology and understanding and using information technology as a strategic weapon, and with this book, you'll learn how your organization can become competitive and how to effectively implement smart business strategies. This book outlines how these portfolio and project decisions have to be made based on both qualitat...

  20. Managing uncertainty for sustainability of complex projects

    DEFF Research Database (Denmark)

    Brink, Tove

    2017-01-01

    Purpose – The purpose of this paper is to reveal how management of uncertainty can enable sustainability of complex projects. Design/methodology/approach – The research was conducted from June 2014 to May 2015 using a qualitative deductive approach among operation and maintenance actors in offshore...... wind farms. The research contains a focus group interview with 11 companies, 20 individual interviews and a seminar presenting preliminary findings with 60 participants. Findings – The findings reveal the need for management of uncertainty through two different paths. First, project management needs...... to join efforts. Research limitations/implications – Further research is needed to reveal the generalisability of the findings in other complex project contexts containing “unknown unknowns”. Practical implications – The research leads to the development of a tool for uncertainty management...

  1. Management of delayed nuclear power plant projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-09-01

    According to the available information at the IAEA PRIS (Power Reactor Information System) at the end of 1998 there were more than 40 nuclear power plant projects with delays of five or more years with respect to the originally scheduled commercial operation. The degree of conformance with original construction schedules showed large variations due to several issues, including financial, economic and public opinion factors. Taking into account the number of projects with several years delay in their original schedules, it was considered useful to identify the subject areas where exchange of experience among Member States would be mutually beneficial in identification of problems and development of guidance for successful management of the completion of these delayed projects. A joint programme of the IAEA Departments of Nuclear Energy (Nuclear Power Engineering Section) and Technical Co-operation (Europe Section, with additional support from the Latin America and West Asia Sections) was set up during the period 1997-1998. The specific aim of the programme was to provide assistance in the management of delayed nuclear power plants regarding measures to maintain readiness for resuming the project implementation schedule when the conditions permit. The integration of IAEA interdepartmental resources enabled the participation of 53 experts from 14 Member States resulting in a wider exchange of experience and dissemination of guidance. Under the framework of the joint programme, senior managers directly responsible for delayed nuclear power plant projects identified several issues or problem areas that needed to be addressed and guidance on management be provided. A work plan for the development of several working documents, addressing the different issues, was established. Subsequently these documents were merged into a single one to produce the present publication. This publication provides information and practical examples on necessary management actions to preserve

  2. Management of delayed nuclear power plant projects

    International Nuclear Information System (INIS)

    1999-09-01

    According to the available information at the IAEA PRIS (Power Reactor Information System) at the end of 1998 there were more than 40 nuclear power plant projects with delays of five or more years with respect to the originally scheduled commercial operation. The degree of conformance with original construction schedules showed large variations due to several issues, including financial, economic and public opinion factors. Taking into account the number of projects with several years delay in their original schedules, it was considered useful to identify the subject areas where exchange of experience among Member States would be mutually beneficial in identification of problems and development of guidance for successful management of the completion of these delayed projects. A joint programme of the IAEA Departments of Nuclear Energy (Nuclear Power Engineering Section) and Technical Co-operation (Europe Section, with additional support from the Latin America and West Asia Sections) was set up during the period 1997-1998. The specific aim of the programme was to provide assistance in the management of delayed nuclear power plants regarding measures to maintain readiness for resuming the project implementation schedule when the conditions permit. The integration of IAEA interdepartmental resources enabled the participation of 53 experts from 14 Member States resulting in a wider exchange of experience and dissemination of guidance. Under the framework of the joint programme, senior managers directly responsible for delayed nuclear power plant projects identified several issues or problem areas that needed to be addressed and guidance on management be provided. A work plan for the development of several working documents, addressing the different issues, was established. Subsequently these documents were merged into a single one to produce the present publication. This publication provides information and practical examples on necessary management actions to preserve

  3. An empirical analysis of the relationship between cost of control activities and project management success

    Directory of Open Access Journals (Sweden)

    Al-Tmeemy Samiaah

    2018-01-01

    Full Text Available To achieve the objectives of continuous improvement programs, construction managers must link the achievement of quality with cost. This paper aims to associate project management success (PMS with cost of control (COC activities in an empirical manner. Thus, the purpose is to determine the extent to which COC activities impact PMS. Quantitative method was adopted to collect data from Malaysian building companies using postal and email surveys. Hypothesis is tested using correlation and simple linear regression analysis. The findings of this study indicate that COC activities are positively associated with the PMS. The empirical evidences obtained from this research, provides financial justification for all quality improvement efforts. This can assist building contractors to enhance the success of project management by reducing the level of business failures due to poor quality, cost overruns, and delays.

  4. APPLICATION OF PROJECT MANAGEMENT APPROACHES AT A SMALL BUSINESSES ENTERPRISES

    Directory of Open Access Journals (Sweden)

    Sergey V. Rajewski

    2016-01-01

    Full Text Available This article discusses the types of organizational structures of project management and their application in project management in small and medium-sized enterprises. Among the approaches and methods to organize projects emphasizing project management as part of the existing functional structure of the enterprise. Analyzed the most relevant organizational tools of project management in small business: a network schedule; matrix distribution of administrative and management tasks of the project; schedule of the project plan; information and technological methods and models used in the process of project management; software applications for project management, used in the sphere of small business.

  5. 48 CFR 46.301 - Contractor inspection requirements.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor inspection... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.301 Contractor inspection requirements. The contracting officer shall insert the clause at 52.246-1, Contractor Inspection Requirements, in solicitations...

  6. 48 CFR 970.5203-3 - Contractor's organization.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contractor's organization... for Management and Operating Contracts 970.5203-3 Contractor's organization. As prescribed in 970.0371-9, insert the following clause: Contractor's Organization (DEC 2000) (a) Organization chart. As...

  7. 48 CFR 450.303-1 - Contractor requests.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contractor requests. 450.303-1 Section 450.303-1 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE CONTRACT MANAGEMENT EXTRAORDINARY CONTRACTUAL ACTIONS Contract Adjustments 450.303-1 Contractor requests. Contractor...

  8. 48 CFR 45.501 - Prime contractor alternate locations.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Prime contractor alternate... CONTRACT MANAGEMENT GOVERNMENT PROPERTY Support Government Property Administration 45.501 Prime contractor... administration from another contract administration office, for purposes of evaluating prime contractor...

  9. The study of the risk management model of construction project

    International Nuclear Information System (INIS)

    Jiang Bo; Feng Yanping; Liu Changbin

    2010-01-01

    The paper first analyzed the development of the risk management of construction project and the risk management processes, and then briefly introduced the risk management experience of foreign project management. From the project management by objectives point of view, the greatest risk came from the lack of clarity of the objectives in the project management, which led to the project's risk emergence. In the analysis of the principles of the project objectives identification and risk allocation, the paper set up a project management model which insurance companies involved in the whole process of the project management, and simply analyzed the roles of insurance company at last. (authors)

  10. Alternative techniques for environmental project management

    International Nuclear Information System (INIS)

    Reeves, S.

    1994-01-01

    Beginning in the late 1970s and early 1980s, increased regulation and recognition of ground water as an important natural resource led industry to address subsurface contamination at many sites. This caused the industry's dependence on environmental consultants to increase drastically. Initially, the accepted practice for addressing environmental concerns was to rely upon consultants to determine appropriate work scope, budgets, procedures and regulatory interaction. While significant advances have been made in technology and consulting services, improvement in project management and cost containment have been limited. In order to effectively manage environmental projects, it is imperative that business risks and standardized project management practices be factored into environmental solutions. A standardized environmental project management program was developed and applied to projects at petroleum marketing facilities throughout the United States. Following development and implementation, detailed studies were conducted to measure the value of standardization in reducing costs and enhancing efficiencies. The results indicate significant improvement in both reducing project costs and in enhancing the efficiency of consultants

  11. Technology Management on Large Construction Projects

    DEFF Research Database (Denmark)

    Bonke, Sten

    The aim of this text is to discuss and to develop the concept of technology management in relation to the empirical field of construction projects. In the first of the two main sections central theories and their derived assertions concerning technology management criteria are summed up...... Fixed Link construction project. Finally on this basis the concluding remarks are pointing to the main theoretical problems and their practical implementations for the introduction of a technology management discipline in construction....... in a schematic theoretical framework. Hereafter the general characteristics of construction are examined from the point of view of serving as an empirical field for technology management analysis. In the second section the technology management theme is associated with the empirical properties of the Great Belt...

  12. COORDINATES OF A RISK MANAGEMENT PROJECT

    Directory of Open Access Journals (Sweden)

    ALEXANDRU OLTEANU

    2013-05-01

    Full Text Available High risk – high benefit: a well-known correlation both in the economic field and in the day-to-day life. Another correlation, on which this article is based: large project – numerous participants – increased risks and other malfunctions. The risk management concept is challenged by those projects and is forced to find the most adequate “customized” ways for each project at its turn. In this respect, the assessment of management has followed the trend of the last three decades, marked by moving of management profit analysis by risk intermediation, respectively the transition from managing profit to risk-return relationship management. Such trend assumes the obligation of participants to identify objectives and expected benefits of the project on the basis of the strategies laid-down, the elements of risk management policies, in conjunction with the indication of the most negative scenarios which they may provide. This activity must take into consideration the process of obtaining and combining human, financial, physical and information resources in order to accomplish the primary goal of the proposed and wanted project by a certain segment of population. Project participants are directed to evaluate their own activities in terms of revenues and risks from the business access, opportunity, operating mode, as well as the limitations and boundaries on certain sides of activity. The paper focuses on the analysis and evaluation of incomes and risks, on simulations to streamline the activities and the determination of the optimal model of project choice. Also, the paper treats the risks that can be taken over by the sponsors, especially those related to implied guaranties, even implied guaranties.

  13. LINKING PROJECTS TO BUSINESS STRATEGY THROUGH PROJECT PORTFOLIO MANAGEMENT

    Directory of Open Access Journals (Sweden)

    A.J. Buys

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: In many organisations, a chasm exists between the development of strategy and its successful implementation. Failure to cross this chasm may ultimately result in strategy failure and the loss of competitive advantage, profits, and employment. Project Portfolio Management (PPM is theorised as a management methodology that links a portfolio of projects to the business strategy. However, current literature lacks empirical evidence of the levels of employment, functionality, and success of the Project Portfolio Management approach in South Africa. A survey of respondents in 32 technology organisations was used to analyze the reasons for the following: strategy implementation and project delivery failure in South African technology organisations; the South African situation regarding the chasm that exists in many organisations between strategy development and successful strategy implementation; and the extent to which – and with what success – Project Portfolio Management is employed in South African technology organisations.

    AFRIKAANSE OPSOMMING: In baie organisasies bestaan daar ’n gaping tussen strategie-ontwikkeling en suksesvolle strategie-implementering. Die onvermoë om die gaping te oorbrug sal uiteindelik lei tot strategiefaling en die verlies van mededingende voordeel, winste, en werksgeleenthede. Projekportefeuljebestuur (PPB word voorgehou as ’n bestuursmetodologie wat ’n portefeulje van projekte koppel aan die besigheidstrategie. Bestaande literatuur gaan egter mank aan empiriese bewyse ten opsigte van die vlakke van indiensneming, funksionaliteit, en sukses van die Projekportefeuljebestuursbenadering in Suid-Afrika. ’n Opname van respondente in 32 tegnologie-organisasies is gebruik om die volgende aspekte te ondersoek: die redes vir falings in strategie-implementering en projekaflewering in Suid-Afrikaanse tegnologie-organisasies; die Suid-Afrikaanse situasie rakende die gaping wat bestaan tussen

  14. The ComSoc guide to managing telecommunications projects

    CERN Document Server

    Desmond, Celia

    2010-01-01

    "This pocket guide provides an overview of the telecommunications environment as it has evolved over the past few years, illustrating the need for project management, the significance of project success to the companies, and the application of key project management processes within the telecom environment. Topics covered include: scope management, time management, cost management, procurement management, risk management, communications, quality, human resources, and Integration. It offers professionals a brief and accessible guide to managing telecommunication projects in the 21st century"--

  15. Project W-211, initial tank retrieval systems, retrieval control system software configuration management plan

    International Nuclear Information System (INIS)

    RIECK, C.A.

    1999-01-01

    This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive design package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization

  16. Ensuring Efficient Incentive and Disincentive Values for Highway Construction Projects: A Systematic Approach Balancing Road User, Agency and Contractor Acceleration Costs and Savings

    Directory of Open Access Journals (Sweden)

    Eul-Bum Lee

    2018-03-01

    Full Text Available United States State Highway Agencies (SHAs use Incentive/Disincentives (I/D to minimize negative impacts of construction on the traveling public through construction acceleration. Current I/D practices have the following short-comings: not standardized, over- or under-compensate contractors, lack of auditability result in disincentives that leave SHAs vulnerable to contractor claims and litigation and are based on agency costs/savings rather than contractor acceleration. Presented within this paper is an eleven-step I/D valuation process. The processes incorporate a US-nationwide RUC and agency cost calculation program, CA4PRS and a time-cost tradeoff I/D process. The incentive calculation used is the summation of the contractor acceleration and a reasonable contractor bonus (based on shared agency savings with an optional reduction of contractor’s own saving from schedule compression (acceleration. The process has a capability to be used both within the US and internationally with minor modifications, relies on historical costs, is simple and is auditable and repeatable. As such, it is a practical tool for optimizing I/D amounts and bridges the gap in existing literature both by its industry applicability, integrating the solution into existing SHA practices and its foundation of contractor acceleration costs.

  17. Project Management: Essential Skill of Nurse Informaticists.

    Science.gov (United States)

    Sipes, Carolyn

    2016-01-01

    With the evolution of nursing informatics (NI), the list of skills has advanced from the original definition that included 21 competencies to 168 basic competencies identified in the TIGER-based Assessment of Nursing Informatics Competencies (TANIC) and 178 advanced skills in the Nursing Informatics Competency Assessment (NICA) L3/L4 developed by Chamberlain College of Nursing, Nursing Informatics Research Team (NIRT). Of these competencies, project management is one of the most important essentials identified since it impacts all areas of NI skills and provides an organizing framework for processes and projects including skills such as design, planning, implementation, follow-up and evaluation. Examples of job roles that specifically require project management skills as an essential part of the NI functions include management, administration, leadership, faculty, graduate level master's and doctorate practicum courses. But first, better understanding of the NI essential skills is vital before adequate education and training programs can be developed.

  18. Environmental Capabilities of Suppliers for Green Supply Chain Management in Construction Projects: A Case Study in Korea

    Directory of Open Access Journals (Sweden)

    Moon Gyu Kim

    2016-01-01

    Full Text Available Green supply chain management (GSCM enhances a firm’s competitiveness for sustainable growth. GSCM is especially important in the construction industry, a project-based business that often results in heavy environmental pollution. For the successful implementation of GSCM in the construction industry to occur, contractors should make the best use of suppliers’ environmental capabilities based on shared understanding of the capabilities. This paper examines the shared understanding of suppliers’ environmental management capabilities between the contractor and suppliers by assessing the consistency between the contractor’s and suppliers’ evaluations of the capabilities. This explorative case study investigates a supply chain comprised of a major construction firm and 106 suppliers in Korea. The results of the case analysis show that the suppliers’ self-evaluation scores of environmental capability are higher than the contractor’s evaluation scores. Furthermore, from both evaluators, suppliers received the lowest scores in the evaluation item rating the relationship with second-tier suppliers and the highest in the evaluation item rating the relationship with the contractor. The consistency between the suppliers’ and contractor’s evaluation is related to several characteristics of suppliers, such as industry type, firm size and partnership duration with the contractor. This study contributes to the literature of GSCM and strategic alignment amongst supply chain partners for the construction industry.

  19. New Production Reactor project-management plan

    International Nuclear Information System (INIS)

    McCrosson, F.J.; Hibbard, L.; Buckner, M.R.

    1982-01-01

    This document provides a project management plan for the first phase of a project to design and build a new production reactor (NPR) at SRP. The design of the NPR is based upon proven SRP heavy water reactor design, with several enhancements such as full containment, moderator detritiation, improved cooling, and modernized control rooms and instrumentation. The first phase of the NPR project includes environmental and safety analyses, preparation of the technical data summary and basic data, site studies, engineering studies, and conceptual design. The project management plan was developed by a 14-member task force comprised of representatives from the Technical Division, the Manufacturing Division, the Departmental Engineer's Office, and the Engineering Department

  20. Risk management for independent power projects

    International Nuclear Information System (INIS)

    Owen, J.L.

    1993-01-01

    Independent Power, where electric utilities or other bulk electric power users contract with individual electric power generation facilities to meet their projected long term power needs, has grown dramatically over the past ten years or more. This concept, to contract with Independent Power Producers (IPP), is not a new concept and in fact goes back to the early formation of the electric power industry in this country and worldwide. Successful Risk Management is the foundation for ultimate project completion and operation in fulfilling the expectations of all parties. The primary risks associated with the development of Independent Power projects include: predicting long term fuel availability and cost; predicting long term price for the deliverable of electricity; site selection, site characteristics and permitting; innovative or evolving technology; project execution (design and construction), and; lifetime O ampersand M costs and plant reliability. This paper focuses on the risks inherent in the development of IPPs and addresses the management of these risks

  1. Non-Profit/Higher Education Project Management Series: Project Management (PM) Foundations

    Science.gov (United States)

    Burgher, Karl E.; Snyder, Michael B.

    2012-01-01

    This is the first in a series of forum articles on applying project management (PM) techniques and tools to the nonprofit sector with a focus on higher education. The authors will begin with a traditional look at project management because they believe that the integration of the tools and the processes associated with PM into many campus offices…

  2. HUBUNGAN KOMPETENSI PROJECT MANAGER TERHADAP KEBERHASILAN PROYEK KONSTRUKSI GEDUNG

    OpenAIRE

    Ida Ayu Ari Brahmantariguna; GAP. Candra Dharmayanti; I W. Yansen

    2016-01-01

    Abstract :One of the factor that influences the achievement of a project success is the role of a project manager. A reliable project manager, who knows his duties as a project leader and has the necessary competency requirements is needed to achieve the success of the project. The competence of a project manager can be measured by three aspects: knowledge, skill and attitude.This research  aims to analyze the relationship between project manager competencies (that measured by three independe...

  3. Cesium legacy safety project management work plan

    International Nuclear Information System (INIS)

    Durham, J.S.

    1998-01-01

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell)

  4. IS-ENES project management - lessons learnt

    Science.gov (United States)

    Parinet, Marie; Guglielmo, Francesca; Joussaume, Sylvie

    2017-04-01

    IS-ENES is the distributed e-infrastructure of models, model data and metadata of the European Network for Earth System Modelling (ENES). It has benefitted from two EC FP7 grants and aims towards further European and national funding to achieve sustainability. We highlight here several challenges related to project management that have risen in the course of these two project-phases spanning 8 years. Some challenges are related to the heterogeneity of the activities within IS-ENES, with different groups working on very diverse activities, not necessarily strictly interdependent. An immediate consequence is the need of implementing and setting up in early phases of the project efficient collection and circulation of information to preserve and reinforce the systemic view of the infrastructure as a whole and the pursuit of common goals, including coordinated provision of services. Toward and beyond such common goals, managing IS-ENES, covering both scientific and more strictly management-related aspects, implies a double-paced approach: besides setting up efficient project workflow, there is the need of setting up longer term objectives. This implies, within the project lifetime, to elaborate and implement a coherent organizational (consistent with scientific goals, funding schemes, research and technology landscape) strategy to pursue these goals beyond the project itself. Furthermore, a series of more generic project management challenges will also be listed and can be gathered around 3 main objectives: ease the internal processes in order to optimize the work, anticipate delays and budget issues, and motivate the project teams by ensuring an efficient internal and external communication.

  5. Measurement of Software Project Management Effectiveness

    Science.gov (United States)

    2008-12-01

    factors such as advertisement of project mission, top management support, client consultation, personnel issues, client acceptance, etc. Trouble...and PERT (Program/Project Evaluation and Review Technique) and CPM (Critical Path Analysis) charts are process models, and the development of Gantt...models (such as Gantt, PERT and CPM ) got wide-acceptance in industry, as Fuggetta (2000) pointed out few (if any) of the proposed PMLs and related

  6. Decommissioning Project Manager's Implementing Instructions (PMII)

    International Nuclear Information System (INIS)

    Mihalic, M.A.

    1998-02-01

    Decommissioning Project personnel are responsible for complying with these PMII. If at any time in the performance of their duties a conflict between these instructions and other written or verbal direction is recognized or perceived, the supervisor or worker shall place his/her work place in a safe condition, stop work, and seek resolution of the conflict from the Decommissioning Project Manager or his designee

  7. PROJECT MANAGEMENT AND RELATIONSHIP MARKETING: INTERSECTIONS FOR STAKEHOLDER MANAGEMENT IN PROJECTS

    Directory of Open Access Journals (Sweden)

    Ronielton Rezende Oliveira

    2017-06-01

    Full Text Available Projects development is essential for organizations. Among the factors originated in projects that influence performance is quality. This variable must be managed to meet the expectations of the stakeholders and this can only be achieved through effective monitoring and control. It can be seen that relationship marketing is relevant to the competitive reality of contemporary organizations. With the purpose of contributing to organizational studies, this theoretical essay proposes to approach project management in relationship marketing. In the context of integrated management, it is discussed how management action can be applied to engage and involve stakeholders in projects, in order to create value and achieve the expectations sustained by the execution of the projects. Based on the reflection, the quality of relationship management is pointed out as a construct of higher order, composed of at least two dimensions: trust and satisfaction.

  8. International Project Management Committee: Overview and Activities

    Science.gov (United States)

    Hoffman, Edward

    2010-01-01

    This slide presentation discusses the purpose and composition of the International Project Management Committee (IMPC). The IMPC was established by members of 15 space agencies, companies and professional organizations. The goal of the committee is to establish a means to share experiences and best practices with space project/program management practitioners at the global level. The space agencies that are involved are: AEB, DLR, ESA, ISRO, JAXA, KARI, and NASA. The industrial and professional organizational members are Comau, COSPAR, PMI, and Thales Alenia Space.

  9. PMP Project Management Professional Exam Study Guide

    CERN Document Server

    Heldman, Kim

    2011-01-01

    Completely updated for the 2011 version of the PMP exam! If you're preparing for the Project Management Professional (PMP) exam, this thorough book is what you need. Not only does it reflect the very latest version of the exam, it is written by popular project management expert Kim Heldman—author of the five previous editions of this top-selling book—and it also includes a CD with practice exams, exam prep software, electronic flashcards, and over two hours of additional audio review. All exam objectives, as well as essential PMP topics, concepts, and key terms are covered.Prepares

  10. Analyzing Project Management Maturity Level in Indonesia

    Directory of Open Access Journals (Sweden)

    Eliot Simangunsong

    2013-05-01

    Full Text Available Normal 0 false false false IN X-NONE X-NONE MicrosoftInternetExplorer4 Project management has been generally known and increasingly used by many organizations to gain competitive advantage. In this context, many studies have proposed maturity models to evaluate how project management knowledge has been deployed effectively and efficiently in organization. As a developing country, Indonesia needs many development projects managed by government and private companies in different industries. Here, a study to assess project management maturity level in Indonesian businesses may bring insight about current business practices, which is important to speed up country development and business sustainability.  Adapting the Project Management Maturity Model (ProMMM, a survey instrument has been developed and applied to professionals from Jakarta and surrounding area.  The result of analysis shows that construction and primary industry have a higher maturity level compare to manufacturing and services.  It is to be noted, however, that the level of project management understanding is low across industries.  This indicates that more quality project management training or certification is required to improve overall project management knowledge in Indonesia. /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin:0cm; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-fareast-theme-font:minor-fareast; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;}

  11. Knowledge Management in Product Development Projects

    International Nuclear Information System (INIS)

    Sheik Muhamad, S.

    2016-01-01

    Full text: Product data management system (PDM) solutions control vast quantities of information generated by engineers during the product development process. They provide vaulting capabilities to control access to shared data,workflow to distribute it, and configured product structures to relate it to product components. Nuclear Malaysia has the desire to have a proper CAD management system and this is achieved with the use of PDM system to manage all their designs throughout the product lifecycle, i.e., for drawing distribution and design change. The type of documents that Nuclear Malaysia manages are CAD files (as generated by CATIA, AUTOCAD), engineering files, reports, project files, documents (WORD, PDF), spreadsheet (EXCEL), bills of material, manufacturing processes and drawings. Besides managing drawings, we also want to control and manage engineering changes (ECO & ECR) in electronic format. (author

  12. Project risk management in complex petrochemical system

    Directory of Open Access Journals (Sweden)

    Kirin Snežana

    2012-01-01

    Full Text Available Investigation of risk in complex industrial systems, as well as evaluation of main factors influencing decision making and implementation process using large petrochemical company as an example, has proved the importance of successful project risk management. This is even more emphasized when analyzing systems with complex structure, i.e. with several organizational units. It has been shown that successful risk management requires modern methods, based on adequate application of statistical analysis methods.

  13. Managing the first nuclear power plant project

    International Nuclear Information System (INIS)

    2007-05-01

    Energy is essential for national development. Nearly every aspect of development - from reducing poverty and raising living standards to improving health care, industrial and agricultural productivity - requires reliable access to modern energy resources. States may have different reasons for considering starting a nuclear power project to achieve their national energy needs, such as: lack of available indigenous energy resources, the desire to reduce dependence upon imported energy, the need to increase the diversity of energy resources and/or mitigation of carbon emission increases. The start of a nuclear power plant project involves several complex and interrelated activities with long duration. Experience shows that the time between the initial policy decision by a State to consider nuclear power up to the start of operation of its first nuclear power plant is about 10 to 15 years and that before specific project management can proceed, several key infrastructure issues have to be in place. The proper management of the wide scope of activities to be planned and implemented during this period represents a major challenge for the involved governmental, utility, regulatory, supplier and other supportive organizations. The main focus is to ensure that the project is implemented successfully from a commercial point of view while remaining in accordance with the appropriate engineering and quality requirements, safety standards and security guides. This publication is aimed at providing guidance on the practical management of a first nuclear power project in a country. There are many other issues, related to ensuring that the infrastructure in the country has been prepared adequately to ensure that the project will be able to be completed, that are only briefly addressed in this publication. The construction of the first nuclear power plant is a major undertaking for any country developing a nuclear power programme. Worldwide experience gained in the last 50 years

  14. 33 CFR 385.24 - Project Management Plans.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  15. Conflict Approaches of Effective Project Manager in the Upstream Sector of Indonesian Oil & Gas Industry

    Directory of Open Access Journals (Sweden)

    Adhi Cahyono

    2012-11-01

    Full Text Available Normal 0 false false false IN X-NONE AR-SA MicrosoftInternetExplorer4 Conflict can be functional or dysfunctional to the organization’s performance. This study focused on the relationship between conflict approaches implemented by the project manager based on project team member’s perception on the effectiveness of the project manager in managing project’s conflict. Questionnaires were modified from Barker et al. (1988 to measure conflict management approaches and outcomes of managing project conflict. Data were gathered from 57 respondents who worked in the Engineering, Procurement, and Construction (EPC contractors serving the upstream sector of the Oil and Gas industry in Indonesia. By using Pearson correlation, result of this study indicated that project managers were perceived to be effective in managing project conflict when implementing cooperative and confi rmative approaches, but ineffective when combining competitive and avoidance approaches. Further research should investigate correlation between cultural dimensions with conflict approaches and outcomes of managing conflict. Keywords: Conflict approaches, effective project manager, EPC contractors, upstream sector of oil and gas industry /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin-top:0cm; mso-para-margin-right:0cm; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0cm; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:Arial; mso-bidi-theme-font:minor-bidi; mso-fareast-language:EN-US;}

  16. AVLIS Production Plant Project Management Plan

    International Nuclear Information System (INIS)

    1984-01-01

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables

  17. A Framework for Effective Software Monitoring in Project Management

    African Journals Online (AJOL)

    A Framework for Effective Software Monitoring in Project Management. ... is shown to provide meaningful interpretation of collected metric data by embedding certain quality function. Key words: Project Management, Feedback, project control, metrics, process model, quantitative validity ... AJOL African Journals Online.

  18. Open Source and Proprietary Project Management Tools for SMEs.

    Directory of Open Access Journals (Sweden)

    Veronika Abramova

    2017-05-01

    Full Text Available The dimensional growth and increasing difficulty in project management promoted the development of different tools that serve to facilitate project management and track project schedule, resources and overall progress. These tools offer a variety of features, from task and time management, up to integrated CRM (Customer Relationship Management and ERP (Enterprise Resource Planning modules. Currently, a large number of project management software is available, to assist project team during the entire project lifecycle. We present the main differences between open source and proprietary project management tools and how those could be important for SMEs, describing the key features and how those can assist the project manager and the development team. In this paper, we analyse four open-source project management tools: OpenProject, ProjectLibre, Redmine, LibrePlan and four proprietary tools: Bitrix24, JIRA, Microsoft Project and Asana.

  19. Risk management in public sector construction projects: Case ...

    African Journals Online (AJOL)

    a project environment. Since projects are complicated, experience ... work, delays trigger cost overruns in construction projects (African. Development Bank ..... quantity surveying, contract management, and engineering. Table 4: Research ..... professionals at the business and operational levels of construction management.

  20. The role of project manager in benefits realization management as a project constraint/driver

    Directory of Open Access Journals (Sweden)

    Amr Mossalam

    2016-12-01

    In summary, the results of this paper can be used to: enlarging the project manager responsibilities to acquire the benefits realization, giving a high level 6-step process for benefits management, suggesting a mechanism for managing these benefits through benefits register, benefits realization plan, measures and KPIs and closure business case.