  1. Project LEAN--lessons learned from a national social marketing campaign.

    Science.gov (United States)

    Samuels, S E

    1993-01-01

    The Henry J. Kaiser Family Foundation initiated a social marketing campaign in 1987 to reduce the nation's risk for heart disease and some cancers. Consensus on recommendations for dietary change have stimulated the development of a variety of social marketing campaigns to promote behavior change. Project LEAN (Low-Fat Eating for America Now) is a national campaign whose goal is to reduce dietary fat consumption to 30 percent of total calories through public service advertising, publicity, and point-of-purchase programs in restaurants, supermarkets, and school and worksite cafeterias. The public service advertising reached 50 percent of the television viewing audience and the print publicity, more than 35 million readers. The toll-free hotline received more than 300,000 calls. Thirty-four organizations joined the foundation in partnership and raised $350,000 for collaborative activities. Thirteen States implemented local campaigns. Lessons have been learned about the use of the media, market segmentation, effective spokespersons, and successful partnerships. These lessons will be valuable to others planning social marketing campaigns on nutrition and other preventive behaviors.

  2. Collecting lessons learned : How project-based organizations in the oil and gas industry learn from their projects

    NARCIS (Netherlands)

    Buttler, T.

    2016-01-01

    Project-based organizations collect lessons learned in order to improve the performance of projects. They aim to repeat successes by using positive lessons learned, and to avoid repeating negative experiences by using negative lessons learned. Cooke-Davies (2002) claimed that the ability to learn

  3. Brentwood Lessons Learned Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Rivkin, Carl H. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Caton, Melanie C. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ainscough, Christopher D. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Marcinkoski, Jason [Dept. of Energy (DOE), Washington DC (United States)

    2017-09-26

    The purpose of this report is to document lessons learned in the installation of the hydrogen fueling station at the National Park Service Brentwood site in Washington, D.C., to help further the deployment of hydrogen infrastructure required to support hydrogen and other fuel cell technologies. Hydrogen fueling is the most difficult infrastructure component to build and permit. Hydrogen fueling can include augmenting hydrogen fueling capability to existing conventional fuel fueling stations as well as building brand new hydrogen fueling stations. This report was produced as part of the Brentwood Lessons Learned project. The project consisted of transplanting an existing modular hydrogen fueling station from Connecticut to the National Park Service Brentwood site. This relocation required design and construction at the Brentwood site to accommodate the existing station design as well as installation and validation of the updated station. One of the most important lessons learned was that simply moving an existing modular station to an operating site was not necessarily straight-forward - performing the relocation required significant effort and cost. The station has to function at the selected operating site and this functionality requires a power supply, building supports connecting to an existing alarm system, electrical grounding and lighting, providing nitrogen for purging, and providing deionized water if an electrolyzer is part of the station package. Most importantly, the station has to fit into the existing site both spatially and operationally and not disrupt existing operations at the site. All of this coordination and integration requires logistical planning and project management. The idea that a hydrogen fueling station can be simply dropped onto a site and made immediately operational is generally not realistic. Other important lessons learned include that delineating the boundaries of the multiple jurisdictions that have authority over a project for

  4. Project LEAN--lessons learned from a national social marketing campaign.

    OpenAIRE

    Samuels, S E

    1993-01-01

    The Henry J. Kaiser Family Foundation initiated a social marketing campaign in 1987 to reduce the nation's risk for heart disease and some cancers. Consensus on recommendations for dietary change have stimulated the development of a variety of social marketing campaigns to promote behavior change. Project LEAN (Low-Fat Eating for America Now) is a national campaign whose goal is to reduce dietary fat consumption to 30 percent of total calories through public service advertising, publicity, an...

  5. A summary of lessons learned at the Shippingport Station Decommissioning Project (SSDP)

    International Nuclear Information System (INIS)

    Crimi, F.P.; Mullee, G.R.

    1987-10-01

    This paper describes the lessons learned from a management perspective during decommissioning. The lessons learned are presented in a chronological sequence during the life of the project up to the present time. The careful analysis of the lessons learned and the implementation of corresponding actions have contributed toward improving the effectiveness of decommissioning as time progresses. The lessons learned should be helpful in planning future decommissioning projects

  6. The human side of lean teams.

    Science.gov (United States)

    Wackerbarth, Sarah B; Strawser-Srinath, Jamie R; Conigliaro, Joseph C

    2015-05-01

    Organizations use lean principles to increase quality and decrease costs. Lean projects require an understanding of systems-wide processes and utilize interdisciplinary teams. Most lean tools are straightforward, and the biggest barrier to successful implementation is often development of the team aspect of the lean approach. The purpose of this article is to share challenges experienced by a lean team charged with improving a hospital discharge process. Reflection on the experience provides an opportunity to highlight lessons from The Team Handbook by Peter Scholtes and colleagues. To improve the likelihood that process improvement initiatives, including lean projects, will be successful, organizations should consider providing training in organizational change principles and team building. The authors' lean team learned these lessons the hard way. Despite the challenges, the team successfully implemented changes throughout the organization that have had a positive impact. Training to understand the psychology of change might have decreased the resistance faced in implementing these changes. © 2014 by the American College of Medical Quality.

  7. Lessons learned bulletin

    International Nuclear Information System (INIS)

    1994-05-01

    During the past four years, the Department of Energy -- Savannah River Operations Office and the Westinghouse Savannah River Company (WSRC) Environmental Restoration (ER) Program completed various activities ranging from waste site investigations to closure and post closure projects. Critiques for lessons learned regarding project activities are performed at the completion of each project milestone, and this critique interval allows for frequent recognition of lessons learned. In addition to project related lessons learned, ER also performs lessons learned critiques. T'he Savannah River Site (SRS) also obtains lessons learned information from general industry, commercial nuclear industry, naval nuclear programs, and other DOE sites within the complex. Procedures are approved to administer the lessons learned program, and a database is available to catalog applicable lessons learned regarding environmental remediation, restoration, and administrative activities. ER will continue to use this database as a source of information available to SRS personnel

  8. The Fernald Closure Project: Lessons Learned

    International Nuclear Information System (INIS)

    Murphy, Cornelius M.; Carr, Dennis

    2008-01-01

    For nearly 37 years, the U.S. Department of Energy site at Fernald - near Cincinnati, Ohio - produced 230,000 metric tons (250,000 short tons) of high-purity, low-enriched uranium for the U.S. Defense Program, generating more than 5.4 million metric tons (6 million short tons) of liquid and solid waste as it carried out its Cold War mission. The facility was shut down in 1989 and clean up began in 1992, when Fluor won the contract to clean up the site. Cleaning up Fernald and returning it to the people of Ohio was a $4.4 billion mega environmental-remediation project that was completed in October 2006. Project evolved through four phases: - Conducting remedial-investigation studies to determine the extent of damage to the environment and groundwater at, and adjacent to, the production facilities; - Selecting cleanup criteria - final end states that had to be met that protect human health and the environment; - Selecting and implementing the remedial actions to meet the cleanup goals; - Executing the work in a safe, compliant and cost-effective manner. In the early stages of the project, there were strained relationships - in fact total distrust - between the local community and the DOE as a result of aquifer contamination and potential health effects to the workers and local residents. To engage citizens and interested stakeholders groups in the decision-making process, the DOE and Fluor developed a public-participation strategy to open the channels of communication with the various parties: site leadership, technical staff and regulators. This approach proved invaluable to the success of the project, which has become a model for future environmental remediation projects. This paper will summarize the history and shares lessons learned: the completion of the uranium-production mission to the implementation of the Records of Decision defining the cleanup standards and the remedies achieved. Lessons learned fall into ten categories: - Regulatory approach with end

  9. Lessons learned applying CASE methods/tools to Ada software development projects

    Science.gov (United States)

    Blumberg, Maurice H.; Randall, Richard L.

    1993-01-01

    This paper describes the lessons learned from introducing CASE methods/tools into organizations and applying them to actual Ada software development projects. This paper will be useful to any organization planning to introduce a software engineering environment (SEE) or evolving an existing one. It contains management level lessons learned, as well as lessons learned in using specific SEE tools/methods. The experiences presented are from Alpha Test projects established under the STARS (Software Technology for Adaptable and Reliable Systems) project. They reflect the front end efforts by those projects to understand the tools/methods, initial experiences in their introduction and use, and later experiences in the use of specific tools/methods and the introduction of new ones.

  10. Lessons Learned from the On-Site Disposal Facility at Fernald Closure Project

    International Nuclear Information System (INIS)

    Kumthekar, U.A.; Chiou, J.D.

    2006-01-01

    The On-Site Disposal Facility (OSDF) at the U.S. Department of Energy's (DOE) Fernald Closure Project near Cincinnati, Ohio is an engineered above-grade waste disposal facility being constructed to permanently store low level radioactive waste (LLRW) and treated mixed LLRW generated during Decommissioning and Demolition (D and D) and soil remediation performed in order to achieve the final land use goal at the site. The OSDF is engineered to store 2.93 million cubic yards of waste derived from the remediation activities. The OSDF is intended to isolate its LLRW from the environment for at least 200 years and for up to 1,000 years to the extent practicable and achievable. Construction of the OSDF started in 1997 and waste placement activities will complete by the middle of April 2006 with the final cover (cap) placement over the last open cell by the end of Spring 2006. An on-site disposal alternative is considered critical to the success of many large-scale DOE remediation projects throughout the United States. However, for various reasons this cost effective alternative is not readily available in many cases. Over the last ten years Fluor Fernald Inc. has cumulated many valuable lessons learned through the complex engineering, construction, operation, and closure processes of the OSDF. Also in the last several years representatives from other DOE sites, State agencies, as well as foreign government agencies have visited the Fernald site to look for proven experiences and practices, which may be adapted for their sites. This paper present a summary of the major issues and lessons leaned at the Fernald site related to engineering, construction, operation, and closure processes for the disposal of remediation waste. The purpose of this paper is to share lessons learned and to benefit other projects considering or operating similar on-site disposal facilities from our successful experiences. (authors)

  11. A summary of lessons learned activities conducted at the OECD Halden Reactor Project

    International Nuclear Information System (INIS)

    Hallbert, B.P.

    1997-01-01

    A series of lessons learned studies have been conducted at the OECD Halden Reactor Project. The purpose of these lessons learned reports are to summarize knowledge and experience gained across a number of research project. This paper presents a summary of main issues addressed in four of these lessons learned projects. These are concerned with software development and quality assurance, software reliability, methods for test and evaluation of developed systems, and the evaluation of system design features

  12. Worldwide Overview of Lessons Learned from Decommissioning Projects

    International Nuclear Information System (INIS)

    Laraia, Michele

    2008-01-01

    With an increasing number of radioactive facilities and reactors now reaching the end of their useful life and being taken out of service, there is a growing emphasis worldwide on the safe and efficient decommissioning of such plants. There is a wealth of experience already gained in decommissioning projects for all kinds of nuclear facilities. It is now possible to compare and discuss progress and accomplishments worldwide. In particular, rather than on the factual descriptions of projects, technologies and case histories, it is important to focus on lessons learned: in this way, the return of experience is felt to effectively contribute to progress. Key issues - inevitably based on a subjective ranking - are presented in this paper. Through the exchange of lessons learned, it is possible to achieve full awareness of the need for resources for and constraints of safe and cost-effective decommissioning. What remains now is the identification of specific, remaining issues that may hinder or delay the smooth progress of decommissioning. To this end, lessons learned provide the necessary background information; this paper tries to make extensive use of practical experience gained by the international community

  13. ADVANTAGES, DISADVANTAGES, AND LESSONS LEARNED FROM MULTI-REACTOR DECOMMISSIONING PROJECTS

    International Nuclear Information System (INIS)

    Morton, M.R.; Nielson, R.R.; Trevino, R.A.

    2003-01-01

    This paper discusses the Reactor Interim Safe Storage (ISS) Project within the decommissioning projects at the Hanford Site and reviews the lessons learned from performing four large reactor decommissioning projects sequentially. The advantages and disadvantages of this multi-reactor decommissioning project are highlighted

  14. A Text Mining Approach for Extracting Lessons Learned from Project Documentation: An Illustrative Case Study

    Directory of Open Access Journals (Sweden)

    Benjamin Matthies

    2017-12-01

    Full Text Available Lessons learned are important building blocks for continuous learning in project-based organisations. Nonetheless, the practical reality is that lessons learned are often not consistently reused for organisational learning. Two problems are commonly described in this context: the information overload and the lack of procedures and methods for the assessment and implementation of lessons learned. This paper addresses these problems, and appropriate solutions are combined in a systematic lesson learned process. Latent Dirichlet Allocation is presented to solve the first problem. Regarding the second problem, established risk management methods are adapted. The entire lessons learned process will be demonstrated in a practical case study

  15. QA lessons learned for parameter control from the WIPP Project

    International Nuclear Information System (INIS)

    Richards, R.R.

    1998-01-01

    This paper provides a summary of lessons learned from experiences on the Waste Isolation Pilot Plant (WJPP) Project in implementation of quality assurance controls surrounding inputs for performance assessment analysis. Since the performance assessment (PA) process is inherent in compliance determination for any waste repository, these lessons-learned are intended to be useful to investigators, analysts, and Quality Assurance (QA) practitioners working on high level waste disposal projects. On the WIPP Project, PA analyses for regulatory-compliance determination utilized several inter-related computer programs (codes) that mathematically modeled phenomena such as radionuclide release, retardation, and transport. The input information for those codes are the parameters that are the subject of this paper. Parameters were maintained in a computer database, which was then queried electronically by the PA codes whenever input was needed as the analyses were run

  16. Lessons Learned and Flight Results from the F15 Intelligent Flight Control System Project

    Science.gov (United States)

    Bosworth, John

    2006-01-01

    A viewgraph presentation on the lessons learned and flight results from the F15 Intelligent Flight Control System (IFCS) project is shown. The topics include: 1) F-15 IFCS Project Goals; 2) Motivation; 3) IFCS Approach; 4) NASA F-15 #837 Aircraft Description; 5) Flight Envelope; 6) Limited Authority System; 7) NN Floating Limiter; 8) Flight Experiment; 9) Adaptation Goals; 10) Handling Qualities Performance Metric; 11) Project Phases; 12) Indirect Adaptive Control Architecture; 13) Indirect Adaptive Experience and Lessons Learned; 14) Gen II Direct Adaptive Control Architecture; 15) Current Status; 16) Effect of Canard Multiplier; 17) Simulated Canard Failure Stab Open Loop; 18) Canard Multiplier Effect Closed Loop Freq. Resp.; 19) Simulated Canard Failure Stab Open Loop with Adaptation; 20) Canard Multiplier Effect Closed Loop with Adaptation; 21) Gen 2 NN Wts from Simulation; 22) Direct Adaptive Experience and Lessons Learned; and 23) Conclusions

  17. Lessons learned from decommissioning projects at Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Salazar, M.

    1995-01-01

    This paper describes lessons learned over the last 20 years from 12 decommissioning projects at Los Alamos National Laboratory. These lessons relate both to overall program management and to management of specific projects during the planning and operations phases. The issues include waste management; the National Environmental Policy Act (NEPA); the Resource Conservation and Recovery Act (RCRA); the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); contracting; public involvement; client/customer interface; and funding. Key elements of our approach are to be proactive; follow the observation method; perform field activities concurrently; develop strategies to keep reportable incidents from delaying work; seek and use programs, methods, etc., in existence to shorten learning curves; network to help develop solutions; and avoid overstudying and overcharacterizing. This approach results in preliminary plans that require very little revision before implementation, reasonable costs and schedules, early acquisition of permits and NEPA documents, preliminary characterization reports, and contracting documents. Our track record is good -- the last four projects (uranium and plutonium-processing facility and three research reactors) have been on budget and on schedule

  18. Lessons Learned from Past and Ongoing Construction Projects

    International Nuclear Information System (INIS)

    Tabatabai, Omid

    2011-01-01

    Full text of publication follows: The nuclear industry in the U.S. faced many construction quality and design issues in the 1970's and 1980's. In 1984, the NRC issued NUREG-1055, 'Improving Quality and the Assurance of Quality in the Design and Construction of Nuclear Power Plants,' to document the lessons learned from nuclear power plant (NPP) construction in the U.S. In recent years, several countries have begun either planning for or actually constructing new NPPs. For instance, in the U.S., the nuclear industry has submitted several combined license and design certification applications to the NRC for licensing reviews and approval to build 30+ new NPP units. Latest construction experience from countries that are currently building new NPPs indicate that these countries are dealing with challenges that are similar to those issues that caused major quality assurance problems, delays, or even termination of several projects in U.S. in the 70's and 80's. The U.S. NRC is pro-actively taking measures to improve its regulatory programs as well as construction oversight activities before new NPPs construction begin in the U.S. In late 2007, the U.S. NRC's Office of New Reactors established a construction experience program (ConE) to obtain and evaluate construction and operating experience events and to identify the lessons learned from these events. In March 2009, the NRC published an Office Instruction to provide a process for incorporating the lessons learned and insights from the design, construction, and operation of the international and domestic NPPs into the licensing reviews, inspections, and construction of new reactors in the U.S. Additionally, the ConE program staff developed a Web-enabled database to store, manage, and make construction experience information available to all NRC technical reviewers as well as inspectors. Because this database contains information from other countries' regulators that are considered

  19. Patient and Stakeholder Engagement in the PCORI Pilot Projects: Description and Lessons Learned.

    Science.gov (United States)

    Forsythe, Laura P; Ellis, Lauren E; Edmundson, Lauren; Sabharwal, Raj; Rein, Alison; Konopka, Kristen; Frank, Lori

    2016-01-01

    Patients and healthcare stakeholders are increasingly becoming engaged in the planning and conduct of biomedical research. However, limited research characterizes this process or its impact. We aimed to characterize patient and stakeholder engagement in the 50 Pilot Projects funded by the Patient-Centered Outcomes Research Institute (PCORI), and identify early contributions and lessons learned. A self-report instrument was completed by researchers between 6 and 12 months following project initiation. Forty-seven principal investigators or their designees (94 % response rate) participated in the study. MAIN MEASURES Self-report of types of stakeholders engaged, stages and levels of engagement, facilitators and barriers to engagement, lessons learned, and contributions from engagement were measured. Most (83 %) reported engaging more than one stakeholder in their project. Among those, the most commonly reported groups were patients (90 %), clinicians (87 %), health system representatives (44 %), caregivers (41 %), and advocacy organizations (41 %). Stakeholders were commonly involved in topic solicitation, question development, study design, and data collection. Many projects engaged stakeholders in data analysis, results interpretation, and dissemination. Commonly reported contributions included changes to project methods, outcomes or goals; improvement of measurement tools; and interpretation of qualitative data. Investigators often identified communication and shared leadership strategies as "critically important" facilitators (53 and 44 % respectively); lack of stakeholder time was the most commonly reported challenge (46 %). Most challenges were only partially resolved. Early lessons learned included the importance of continuous and genuine partnerships, strategic selection of stakeholders, and accommodation of stakeholders' practical needs. PCORI Pilot Projects investigators report engaging a variety of stakeholders across many stages of research, with specific

  20. Designing a lessons learned model to improve the success of new product development in project oriented organizations

    Directory of Open Access Journals (Sweden)

    Ahmad

    2016-12-01

    Full Text Available Nowadays, project-based organizations need to utilize intellectual capital and knowledge to become leader in their business activities. The new approach to use knowledge based skills from one side and development of the new complicated products from the other side have increased the need for designing a lessons learned model. The purpose of this paper is to design a lessons learned model to improve the success of new product development for project oriented organizations. The study designs a questionnaire in Likert scale and distributes it among 56 experts who were well informed about various techniques of new product development and lessons learned. Cronbach alphas for all components of the survey were well above the desirable level. The results of the survey have indicated that there were positive and meaningful relationships between lessons learned components and the success of the new product development.

  1. Innovative Work Practices and Lessons Learned at the N Area Deactivation Project

    International Nuclear Information System (INIS)

    Day, R.S.

    1999-01-01

    This report identifies many of the lessons learned, innovations,and effective work practices that derived from activities supporting the N Area Deactivation Project at the U.S. Department of Energy's (DOE) Hanford Site. The work practices discussed in this report may be applicable and beneficial to similar projects throughout the DOE complex

  2. St. Louis FUSRAP Lessons Learned

    International Nuclear Information System (INIS)

    Eberlin, J.; Williams, D.; Mueller, D.

    2003-01-01

    The purpose of this paper is to present lessons learned from fours years' experience conducting Remedial Investigation and Remedial Action activities at the St. Louis Downtown Site (SLDS) under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Many FUSRAP sites are experiencing challenges conducting Remedial Actions within forecasted volume and budget estimates. The St. Louis FUSRAP lessons learned provide insight to options for cost effective remediation at FUSRAP sites. The lessons learned are focused on project planning (budget and schedule), investigation, design, and construction

  3. Optimizing Clinical Operations as part of a Global Emergency Medicine Initiative in Kumasi, Ghana: Application of Lean Manufacturing Principals to Low Resource Health Systems

    Science.gov (United States)

    Carter, Patrick M.; Desmond, Jeffery S.; Akanbobnaab, Christopher; Oteng, Rockefeller A.; Rominski, Sarah; Barsan, William G.; Cunningham, Rebecca

    2012-01-01

    Background Although many global health programs focus on providing clinical care or medical education, improving clinical operations can have a significant effect on patient care delivery, especially in developing health systems without high-level operations management. Lean manufacturing techniques have been effective in decreasing emergency department (ED) length of stay, patient waiting times, numbers of patients leaving without being seen, and door-to-balloon times for ST-elevation myocardial infarction in developed health systems; but use of Lean in low to middle income countries with developing emergency medicine systems has not been well characterized. Objectives To describe the application of Lean manufacturing techniques to improve clinical operations at Komfo Anokye Teaching Hospital in Ghana and to identify key lessons learned to aid future global EM initiatives. Methods A three-week Lean improvement program focused on the hospital admissions process at Komfo Anokye Teaching Hospital was completed by a 14-person team in six stages: problem definition, scope of project planning, value stream mapping, root cause analysis, future state planning, and implementation planning. Results The authors identified eight lessons learned during our use of Lean to optimize the operations of an ED in a global health setting: 1) the Lean process aided in building a partnership with Ghanaian colleagues; 2) obtaining and maintaining senior institutional support is necessary and challenging; 3) addressing power differences among the team to obtain feedback from all team members is critical to successful Lean analysis; 4) choosing a manageable initial project is critical to influence long-term Lean use in a new environment; 5) data intensive Lean tools can be adapted and are effective in a less resourced health system; 6) several Lean tools focused on team problem solving techniques worked well in a low resource system without modification; 7) using Lean highlighted that

  4. Optimizing clinical operations as part of a global emergency medicine initiative in Kumasi, Ghana: application of Lean manufacturing principals to low-resource health systems.

    Science.gov (United States)

    Carter, Patrick M; Desmond, Jeffery S; Akanbobnaab, Christopher; Oteng, Rockefeller A; Rominski, Sarah D; Barsan, William G; Cunningham, Rebecca M

    2012-03-01

    Although many global health programs focus on providing clinical care or medical education, improving clinical operations can have a significant effect on patient care delivery, especially in developing health systems without high-level operations management. Lean manufacturing techniques have been effective in decreasing emergency department (ED) length of stay, patient waiting times, numbers of patients leaving without being seen, and door-to-balloon times for ST-elevation myocardial infarction in developed health systems, but use of Lean in low to middle income countries with developing emergency medicine (EM) systems has not been well characterized. To describe the application of Lean manufacturing techniques to improve clinical operations at Komfo Anokye Teaching Hospital (KATH) in Ghana and to identify key lessons learned to aid future global EM initiatives. A 3-week Lean improvement program focused on the hospital admissions process at KATH was completed by a 14-person team in six stages: problem definition, scope of project planning, value stream mapping, root cause analysis, future state planning, and implementation planning. The authors identified eight lessons learned during our use of Lean to optimize the operations of an ED in a global health setting: 1) the Lean process aided in building a partnership with Ghanaian colleagues; 2) obtaining and maintaining senior institutional support is necessary and challenging; 3) addressing power differences among the team to obtain feedback from all team members is critical to successful Lean analysis; 4) choosing a manageable initial project is critical to influence long-term Lean use in a new environment; 5) data intensive Lean tools can be adapted and are effective in a less resourced health system; 6) several Lean tools focused on team problem-solving techniques worked well in a low-resource system without modification; 7) using Lean highlighted that important changes do not require an influx of resources; and

  5. Value pricing pilot program : lessons learned

    Science.gov (United States)

    2008-08-01

    This "Lessons Learned Report" provides a summary of projects sponsored by the Federal Highway Administration's (FHWA's) Congestion and Value Pricing Pilot Programs from 1991 through 2006 and draws lessons from a sample of projects with the richest an...

  6. Apply Lean Thinking in Project Management

    OpenAIRE

    Pham Ngoc, Lan

    2015-01-01

    The purpose of this thesis was to study the effects of Lean Thinking in Project Management and how applying Lean Project Management could enhance the productivity of project work. The study was carried using theoretical research and collecting empirical data from three interviews and one case study at a local company. At the end of the study, the major project management problems at the company were identified and analyzed following Lean Principles. It was also pointed out where there...

  7. A Methodology for the Assessment of Experiential Learning Lean: The Lean Experience Factory Study

    Science.gov (United States)

    De Zan, Giovanni; De Toni, Alberto Felice; Fornasier, Andrea; Battistella, Cinzia

    2015-01-01

    Purpose: The purpose of this paper is to present a methodology to assess the experiential learning processes of learning lean in an innovative learning environment: the lean model factories. Design/methodology/approach: A literature review on learning and lean management literatures was carried out to design the methodology. Then, a case study…

  8. Lessons learned: Managing the development of a corporate Ada training project

    Science.gov (United States)

    Blackmon, Linda F.

    1986-01-01

    The management lessons learned during the implementation of a corporate mandate to develop and deliver an effective Ada training program to all divisions are discussed. The management process involved in obtaining cooperation from all levels in the development of a corporate-wide project is described. The problem areas are identified along with some possible solutions.

  9. Software Engineering Team Project - lessons learned

    Directory of Open Access Journals (Sweden)

    Bogumiła Hnatkowska

    2013-06-01

    Full Text Available In the 2010/11 academic year the Institute of Informatics at Wroclaw University of Technology issued ’Software Engineering Team Project’ as a course being a part of the final exam to earn bachelor’s degree. The main assumption about the course was that it should simulate the real environment (a virtual IT company for its participants. The course was aimed to introduce issues regarding programming in the medium scale, project planning and management. It was a real challenge as the course was offered for more than 140 students. The number of staff members involved in its preparation and performance was more than 15. The paper presents the lessons learned from the first course edition as well as more detailed qualitative and quantitative course assessment.

  10. Project Interface Requirements Process Including Shuttle Lessons Learned

    Science.gov (United States)

    Bauch, Garland T.

    2010-01-01

    Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings

  11. Criticality Safety Lessons Learned in a Deactivation and Decommissioning Environment [A Guide for Facility and Project Managers

    Energy Technology Data Exchange (ETDEWEB)

    Nirider, L. Tom

    2003-08-06

    This document was designed as a reference and a primer for facility and project managers responsible for Deactivation and Decommissioning (D&D) processes in facilities containing significant inventories of fissionable materials. The document contains lessons learned and guidance for the development and management of criticality safety programs. It also contains information gleaned from occurrence reports, assessment reports, facility operations and management, NDA program reviews, criticality safety experts, and criticality safety evaluations. This information is designed to assist in the planning process and operational activities. Sufficient details are provided to allow the reader to understand the events, the lessons learned, and how to apply the information to present or planned D&D processes. Information is also provided on general lessons learned including criticality safety evaluations and criticality safety program requirements during D&D activities. The document also explores recent and past criticality accidents in operating facilities, and it extracts lessons learned pertinent to D&D activities. A reference section is included to provide additional information. This document does not address D&D lessons learned that are not pertinent to criticality safety.

  12. Project-Based Learning Using Discussion and Lesson-Learned Methods via Social Media Model for Enhancing Problem Solving Skills

    Science.gov (United States)

    Jewpanich, Chaiwat; Piriyasurawong, Pallop

    2015-01-01

    This research aims to 1) develop the project-based learning using discussion and lesson-learned methods via social media model (PBL-DLL SoMe Model) used for enhancing problem solving skills of undergraduate in education student, and 2) evaluate the PBL-DLL SoMe Model used for enhancing problem solving skills of undergraduate in education student.…

  13. Constellation Program Lessons Learned. Volume 2; Detailed Lessons Learned

    Science.gov (United States)

    Rhatigan, Jennifer; Neubek, Deborah J.; Thomas, L. Dale

    2011-01-01

    These lessons learned are part of a suite of hardware, software, test results, designs, knowledge base, and documentation that comprises the legacy of the Constellation Program. The context, summary information, and lessons learned are presented in a factual format, as known and described at the time. While our opinions might be discernable in the context, we have avoided all but factually sustainable statements. Statements should not be viewed as being either positive or negative; their value lies in what we did and what we learned that is worthy of passing on. The lessons include both "dos" and "don ts." In many cases, one person s "do" can be viewed as another person s "don t"; therefore, we have attempted to capture both perspectives when applicable and useful. While Volume I summarizes the views of those who managed the program, this Volume II encompasses the views at the working level, describing how the program challenges manifested in day-to-day activities. Here we see themes that were perhaps hinted at, but not completely addressed, in Volume I: unintended consequences of policies that worked well at higher levels but lacked proper implementation at the working level; long-term effects of the "generation gap" in human space flight development, the need to demonstrate early successes at the expense of thorough planning, and the consequences of problems and challenges not yet addressed because other problems and challenges were more immediate or manifest. Not all lessons learned have the benefit of being operationally vetted, since the program was cancelled shortly after Preliminary Design Review. We avoid making statements about operational consequences (with the exception of testing and test flights that did occur), but we do attempt to provide insight into how operational thinking influenced design and testing. The lessons have been formatted with a description, along with supporting information, a succinct statement of the lesson learned, and

  14. Lessons Learned from Net Zero Energy Assessments and Renewable Energy Projects at Military Installations

    Energy Technology Data Exchange (ETDEWEB)

    Callahan, M.; Anderson, K.; Booth, S.; Katz, J.; Tetreault, T.

    2011-09-01

    Report highlights the increase in resources, project speed, and scale that is required to achieve the U.S. Department of Defense (DoD) energy efficiency and renewable energy goals and summarizes the net zero energy installation assessment (NZEI) process and the lessons learned from NZEI assessments and large-scale renewable energy projects implementations at DoD installations.

  15. Bruce A restart (execution and lessons-learned)

    International Nuclear Information System (INIS)

    Soini, J.

    2011-01-01

    Lessons learned with the Bruce Units 3 and 4 restart have been incorporated into the current refurbishment of Units 1 and 2. In addition, lessons learned on the lead unit (U2) are aggressively applied on the lagging unit (U1) to maximize efficiency and productivity. There will be a discussion on how this internal OPEX, along with external lessons learned, are used to continuously improve all aspects of the Bruce A Restart project management cycle, from scope selection, through planning and scheduling, to execution.

  16. Criticality Safety Lessons Learned in a Deactivation and Decommissioning Environment [A Guide for Facility and Project Managers

    International Nuclear Information System (INIS)

    NIRIDER, L.T.

    2003-01-01

    This document was designed as a reference and a primer for facility and project managers responsible for Deactivation and Decommissioning (D and D) processes in facilities containing significant inventories of fissionable materials. The document contains lessons learned and guidance for the development and management of criticality safety programs. It also contains information gleaned from occurrence reports, assessment reports, facility operations and management, NDA program reviews, criticality safety experts, and criticality safety evaluations. This information is designed to assist in the planning process and operational activities. Sufficient details are provided to allow the reader to understand the events, the lessons learned, and how to apply the information to present or planned D and D processes. Information is also provided on general lessons learned including criticality safety evaluations and criticality safety program requirements during D and D activities. The document also explores recent and past criticality accidents in operating facilities, and it extracts lessons learned pertinent to D and D activities. A reference section is included to provide additional information. This document does not address D and D lessons learned that are not pertinent to criticality safety

  17. Lessons learned on digital systems safety

    International Nuclear Information System (INIS)

    Sivertsen, Terje

    2005-06-01

    A decade ago, in 1994, lessons learned from Halden research activities on digital systems safety were summarized in the reports HWR-374 and HWR-375, under the title 'A Lessons Learned Report on Software Dependability'. The reports reviewed all activities made at the Halden Project in this field since 1977. As such, the reports provide a wealth of information on Halden research. At the same time, the lessons learned from the different activities are made more accessible to the reader by being summarized in terms of results, conclusions and recommendations. The present report provides a new lessons learned report, covering the Halden Project research activities in this area from 1994 to medio 2005. As before, the emphasis is on the results, conclusions and recommendations made from these activities, in particular how they can be utilized by different types of organisations, such as licensing authorities, safety assessors, power companies, and software developers. The contents of the report have been edited on the basis of input from a large number of Halden work reports, involving many different authors. Brief summaries of these reports are included in the last part of the report. (Author)

  18. Getting 'Lean': hardwiring process excellence into Northeast Health.

    Science.gov (United States)

    Brown, Tricia; Duthe, Robert

    2009-01-01

    Many healthcare organizations are turning to the "Lean" Toyota Production System as a means to hardwire process excellence into their organizations. Northeast Health, an integrated delivery system in New York's capital region, introduced the Lean concept into its culture in 2004. After four years, the organization is beginning to see its staff hardwire Lean thinking into day-to-day behaviors. This paper focuses on the approach used by Northeast Health to introduce Lean concepts into its culture, challenges faced, lessons learned and the factors critical to success.

  19. The German Chernobyl project: Lessons learned

    International Nuclear Information System (INIS)

    Hill, P.; Hille, R.

    1999-01-01

    This report presents results and lessons learned by one of the so far largest assessments of a post-accidental situation. Funded by the Federal Republic of Germany the German Chernobyl Project investigated in the years 1991-1993 the radiological situation in contaminated regions of the Russian Federation, Belarus and Ukraine. Measurements included a mass screening of the population in order to determine the Cesium body burdens of 250,000+ individuals in more than 240 settlements as well as the evaluation of external doses in selected settlements with soil contaminations varying from less than 74 kBq/m 2 to about 3700 kBq/m 2 including some, where decontamination measures had previously been taken. Also in many settlements environmental monitoring was undertaken. For most individuals doses did not exceed the international annual limits set for the general population. Open and comprehensive communication of results was favourably accepted by the public. In a few settlements the radiological situation has been followed up till to date. (author)

  20. Crowdfunding Astronomy Outreach Projects: Lessons learned from the UNAWE crowdfunding campaign

    Science.gov (United States)

    Ashton, A. J., Heenatigala, T.; Russo, P.

    2014-12-01

    In recent years, crowdfunding has become a popular method of funding new technology or entertainment products, or artistic projects. The idea is that people or projects ask for many small donations from individuals who support the proposed work, rather than a large amount from a single source. Crowdfunding is usually done via an online portal or platform which handles the financial transactions involved. The Universe Awareness (UNAWE) programme decided to undertake a Kickstarter1 crowdfunding campaign centring on the resource Universe in a Box. In this article we present the lessons learned and best practices from that campaign.

  1. [Managing digital medical imaging projects in healthcare services: lessons learned].

    Science.gov (United States)

    Rojas de la Escalera, D

    2013-01-01

    Medical imaging is one of the most important diagnostic instruments in clinical practice. The technological development of digital medical imaging has enabled healthcare services to undertake large scale projects that require the participation and collaboration of many professionals of varied backgrounds and interests as well as substantial investments in infrastructures. Rather than focusing on systems for dealing with digital medical images, this article deals with the management of projects for implementing these systems, reviewing various organizational, technological, and human factors that are critical to ensure the success of these projects and to guarantee the compatibility and integration of digital medical imaging systems with other health information systems. To this end, the author relates several lessons learned from a review of the literature and the author's own experience in the technical coordination of digital medical imaging projects. Copyright © 2012 SERAM. Published by Elsevier Espana. All rights reserved.

  2. Identifying different methods for creating knowledge from lessons learned in project oriented organizations

    Directory of Open Access Journals (Sweden)

    Ahmad Norang

    2016-01-01

    Full Text Available Nowadays, the increase in competition has increased the relative importance of innovation for most firms and many managers believe a good innovation must be knowledge oriented. This paper has tried to determine different methods for creating knowledge in project oriented organizations. The study designs a questionnaire in Likert scale and distributes it among 32 experts who were well informed about different methods of knowledge creation and lessons learned. Cronbach alphas for all components of the survey were well above the desirable level. The study has detected 11 methods for knowledge creation and lessons learned. In terms of preliminary assessment, business transactions has received the highest impact while knowledge team has received the highest effect in terms of necessary assessment. The results of this survey have indicated that although there are several methods for detecting knowledge within organizations, in most cases, it is not easy to gain value added knowledge within an organization, quickly. The people who participated in our survey have indicated that organizational commitment, brainstorming, Delphi and storytelling also have played important role for creation of knowledge. The results have also shown that brainstorming, knowledge brokers, map knowledge and work experience were easier to use for knowledge creation and lessons learned compared with other forms of knowledge creation.

  3. Recruitment and Lessons Learned from a Community-Based Intervention Program: The Learning Families Project in Hong Kong.

    Science.gov (United States)

    Chu, Joanna T W; Wan, Alice; Stewart, Sunita M; Ng, Kwok Tung; Lam, Tai Hing; Chan, Sophia S

    2018-01-01

    Recruitment is central to any research project, and recruitment itself should be well documented and researched. We describe our recruitment efforts for a community-based research project-entitled the Learning Families Project-conducted in Hong Kong. In collaboration with community stakeholders, residents from a public housing estate were recruited to participate in family programs aimed at enhancing family well-being. Various recruitment strategies were employed including the distribution of 19,200 leaflets, 688 posters, a banner, a kick-off ceremony, 10 promotion activities, 1,000 direct calls, word of mouth, 51 mobile counters, and 10 door-to-door visits. Drawing on field notes, research logs, short questionnaires, and focus group conducted with our community partners and residents, we describe and discuss our recruitment strategies, challenges, and lessons learned. Over a 9-month period, 980 participants were recruited and participated in our study, exceeding our recruitment goal (860 participants). Several observations were made including active recruitment strategies (i.e., door-to-door and mobile counter) being more effective than passive strategies (i.e., posters and leaflets); the importance of raising project awareness to facilitate recruitment; and the challenges encountered (i.e., burn-out and loss of motivation of staff, decreased community capacity in collaborating in research projects). The lessons learned include the importance of engaging Chinese communities, utilizing a positive outreach approach, and setting realistic expectations. Although similar recruitment strategies have been reported the West, a number of cultural differences should be taken into account when working with Chinese population. Further research is needed to examine the effectiveness of tailoring recruitment strategies to various populations.

  4. Summary of Planned Implementation for the HTGR Lessons Learned Applicable to the NGNP

    International Nuclear Information System (INIS)

    Mckirdy, Ian

    2011-01-01

    This document presents a reconciliation of the lessons learned during a 2010 comprehensive evaluation of pertinent lessons learned from past and present high temperature gas-cooled reactors that apply to the Next Generation Nuclear Plant Project along with current and planned activities. The data used are from the latest Idaho National Laboratory research and development plans, the conceptual design report from General Atomics, and the pebble bed reactor technology readiness study from AREVA. Only those lessons related to the structures, systems, and components of the Next Generation Nuclear Plant (NGNP), as documented in the recently updated lessons learned report are addressed. These reconciliations are ordered according to plant area, followed by the affected system, subsystem, or component; lesson learned; and finally an NGNP implementation statement. This report (1) provides cross references to the original lessons learned document, (2) describes the lesson learned, (3) provides the current NGNP implementation status with design data needs associated with the lesson learned, (4) identifies the research and development being performed related to the lesson learned, and (5) summarizes with a status of how the lesson learned has been addressed by the NGNP Project.

  5. Lessons Learned Report for the radioactive mixed waste land disposal facility (Trench 31, Project W-025)

    International Nuclear Information System (INIS)

    Irons, L.G.

    1995-01-01

    This report presents the lessons learned from a project that involved modification to the existing burial grounds at the Hanford Reservation. This project has been focused on the development and operation of a Resource Conservation and Recovery Act compliant landfill which will accept low-level radioactive wastes that have been placed in proper containers

  6. Design, Implementation, and Lessons Learned from a Digital Storytelling Project in an Undergraduate Health Promotion Theory Course

    Science.gov (United States)

    Rimando, Marylen; Smalley, K. Bryant; Warren, Jacob C.

    2015-01-01

    This article describes the design, implementation and lessons learned from a digital storytelling project in a health promotion theory course. From 2011-2012, 195 health promotion majors completed a digital storytelling project at a Midwestern university. The instructor observed students' understanding of theories and models. This article adds to…

  7. The Value of Identifying and Recovering Lost GN&C Lessons Learned: Aeronautical, Spacecraft, and Launch Vehicle Examples

    Science.gov (United States)

    Dennehy, Cornelius J.; Labbe, Steve; Lebsock, Kenneth L.

    2010-01-01

    Within the broad aerospace community the importance of identifying, documenting and widely sharing lessons learned during system development, flight test, operational or research programs/projects is broadly acknowledged. Documenting and sharing lessons learned helps managers and engineers to minimize project risk and improve performance of their systems. Often significant lessons learned on a project fail to get captured even though they are well known 'tribal knowledge' amongst the project team members. The physical act of actually writing down and documenting these lessons learned for the next generation of NASA GN&C engineers fails to happen on some projects for various reasons. In this paper we will first review the importance of capturing lessons learned and then will discuss reasons why some lessons are not documented. A simple proven approach called 'Pause and Learn' will be highlighted as a proven low-impact method of organizational learning that could foster the timely capture of critical lessons learned. Lastly some examples of 'lost' GN&C lessons learned from the aeronautics, spacecraft and launch vehicle domains are briefly highlighted. In the context of this paper 'lost' refers to lessons that have not achieved broad visibility within the NASA-wide GN&C CoP because they are either undocumented, masked or poorly documented in the NASA Lessons Learned Information System (LLIS).

  8. Teacher Improvement Projects in Guinea: Lessons Learned from Taking a Program to National Scale.

    Science.gov (United States)

    Schwille, John; Dembele, Martial; Diallo, Alpha Mahmoudou

    2001-01-01

    Highlights lessons learned from a small, grant-funded teacher improvement project in Guinea that went nationwide, including: it is possible to make such a system work on a national scale in a resource-scarce country; effective initial and continued training is critical for all participants; it is difficult to provide close-to-school assistance…

  9. E-LEARNING FROM NATURE THROUGH E-LESSONS

    Directory of Open Access Journals (Sweden)

    Anca Cristina COLIBABA

    2017-08-01

    Full Text Available The article is a study based on the e-Learning from Nature project (2015-1-IT02-KA201-015133 funded by the European Commission. The project’s main objectives are centred on improving students’ low achievement and stimulating secondary school students’ interest in science subjects. The article focuses on scientific education and its challenges and suggests an innovative approach which connects science with nature. It examines one of the most important project outputs: the e-lessons (short video lessons created within the European partnership and the way they can contribute to increasing students’ motivation to learn science. Participant teachers’ testimonials have also been considered in the general evaluation of this project output.

  10. Improving IT Project Portfolio Management: Lessons Learned

    DEFF Research Database (Denmark)

    Pedersen, Keld

    2013-01-01

    The IT PPM improvement process is not well understood, and our knowledge about what makes IT PPM improvement succeed or fail is not well developed. This article presents lessons learned from organizations trying to improve their IT PPM practice. Based on this research IT PPM practitioners are adv...

  11. Lessons Learned from Ares I Upper Stage Structures and Thermal Design

    Science.gov (United States)

    Ahmed, Rafiq

    2012-01-01

    The Ares 1 Upper Stage was part of the vehicle intended to succeed the Space Shuttle as the United States manned spaceflight vehicle. Although the Upper Stage project was cancelled, there were many lessons learned that are applicable to future vehicle design. Lessons learned that are briefly detailed in this Technical Memorandum are for specific technical areas such as tank design, common bulkhead design, thrust oscillation, control of flight and slosh loads, purge and hazardous gas system. In addition, lessons learned from a systems engineering and vehicle integration perspective are also included, such as computer aided design and engineering, scheduling, and data management. The need for detailed systems engineering in the early stages of a project is emphasized throughout this report. The intent is that future projects will be able to apply these lessons learned to keep costs down, schedules brief, and deliver products that perform to the expectations of their customers.

  12. Lessons Learned in Software Testing A Context-Driven Approach

    CERN Document Server

    Kaner, Cem; Pettichord, Bret

    2008-01-01

    Decades of software testing experience condensed into the most important lessons learned.The world's leading software testing experts lend you their wisdom and years of experience to help you avoid the most common mistakes in testing software. Each lesson is an assertion related to software testing, followed by an explanation or example that shows you the how, when, and why of the testing lesson. More than just tips, tricks, and pitfalls to avoid, Lessons Learned in Software Testing speeds you through the critical testing phase of the software development project without the extensive trial an

  13. Recruitment and Lessons Learned from a Community-Based Intervention Program: The Learning Families Project in Hong Kong

    Directory of Open Access Journals (Sweden)

    Joanna T. W. Chu

    2018-02-01

    Full Text Available BackgroundRecruitment is central to any research project, and recruitment itself should be well documented and researched. We describe our recruitment efforts for a community-based research project—entitled the Learning Families Project—conducted in Hong Kong.MethodsIn collaboration with community stakeholders, residents from a public housing estate were recruited to participate in family programs aimed at enhancing family well-being. Various recruitment strategies were employed including the distribution of 19,200 leaflets, 688 posters, a banner, a kick-off ceremony, 10 promotion activities, 1,000 direct calls, word of mouth, 51 mobile counters, and 10 door-to-door visits. Drawing on field notes, research logs, short questionnaires, and focus group conducted with our community partners and residents, we describe and discuss our recruitment strategies, challenges, and lessons learned.ResultsOver a 9-month period, 980 participants were recruited and participated in our study, exceeding our recruitment goal (860 participants. Several observations were made including active recruitment strategies (i.e., door-to-door and mobile counter being more effective than passive strategies (i.e., posters and leaflets; the importance of raising project awareness to facilitate recruitment; and the challenges encountered (i.e., burn-out and loss of motivation of staff, decreased community capacity in collaborating in research projects.ConclusionThe lessons learned include the importance of engaging Chinese communities, utilizing a positive outreach approach, and setting realistic expectations. Although similar recruitment strategies have been reported the West, a number of cultural differences should be taken into account when working with Chinese population. Further research is needed to examine the effectiveness of tailoring recruitment strategies to various populations.

  14. Tunneling on the Yucca Mountain Project: Progress and lessons learned

    International Nuclear Information System (INIS)

    Hansmire, W.H.; Rogers, D.J.; Wightman, W.D.

    1996-01-01

    The Yucca Mountain Site Characterization Project is the US's effort to confirm the technical acceptability of Yucca Mountain as a repository for high-level nuclear waste. A key part of the site characterization project is the construction of a 7.8-km-long, 7.6-m-diameter tunnel for in-depth geologic and other scientific investigations. The work is governed in varying degrees by the special requirements for nuclear quality assurance, which imposes uncommon and often stringent limitations on the materials which can be used in construction, the tunneling methods and procedures used, and record-keeping for many activities. This paper presents the current status of what has been learned, how construction has adapted to meet the requirements, and how the requirements were interpreted in a mitigating way to meet the legal obligations, yet build the tunnel as rapidly as possible. With regard to design methodologies and the realities of tunnel construction, ground support with a shielded Tunnel Boring Machine is discussed. Notable lessons learned include the need for broad design analyses for a wide variety of conditions and how construction procedures affect ground support

  15. Is There a Lean Future for Global Startups?

    Directory of Open Access Journals (Sweden)

    Stoyan Tanev

    2017-05-01

    Full Text Available This article integrates insights from the latest research on the lean startup entrepreneurial method, born-global firms, and global startups. It contributes to the clarification of terminology referring to the global aspects of startups, summarizes insights from previous literature focusing on global startups, and further substantiates the articulation of the need for considering the lean global startup as a new type of firm. The main message is that the lessons learned from the emergence of lean startup entrepreneurship offer a basis for promoting a similar lean phase in technology-based global startup research and practice. The analysis should benefit both researchers and practitioners in technology entrepreneurship, international entrepreneurship, and global innovation management.

  16. Can lean save lives?

    Science.gov (United States)

    Fillingham, David

    2007-01-01

    The purpose of this paper is to show how over the last 18 months Bolton Hospitals NHS Trust have been exploring whether or not lean methodologies, often known as the Toyota Production System, can indeed be applied to healthcare. This paper is a viewpoint. One's early experience is that lean really can save lives. The Toyota Production System is an amazingly successful way of manufacturing cars. It cannot be simply translated unthinkingly into a hospital but lessons can be learned from it and the method can be adapted and developed so that it becomes owned by healthcare staff and focused towards the goal of improved patient care. Working in healthcare is a stressful and difficult thing. Everyone needs a touch of inspiration and encouragement. Applying lean to healthcare in Bolton seems to be achieving just that for those who work there.

  17. Geocuration Lessons Learned from the Climate Data Initiative Project

    Science.gov (United States)

    Ramachandran, Rahul; Bugbee, Kaylin; Tilmes, Curt; Pinheiro Privette, Ana

    2015-01-01

    Curation is traditionally defined as the process of collecting and organizing information around a common subject matter or a topic of interest and typically occurs in museums, art galleries, and libraries. The task of organizing data around specific topics or themes is a vibrant and growing effort in the biological sciences but to date this effort has not been actively pursued in the Earth sciences. This presentation will introduce the concept of geocuration, which we define it as the act of searching, selecting, and synthesizing Earth science data/metadata and information from across disciplines and repositories into a single, cohesive, and useful compendium. We also present the Climate Data Initiative (CDI) project as an prototypical example. The CDI project is a systematic effort to manually curate and share openly available climate data from various federal agencies. CDI is a broad multi-agency effort of the U.S. government and seeks to leverage the extensive existing federal climate-relevant data to stimulate innovation and private-sector entrepreneurship to support national climate change preparedness. The geocuration process used in the CDI project, key lessons learned, and suggestions to improve similar geocuration efforts in the future will be part of this presentation.

  18. Geocuration Lessons Learned from the Climate Data Initiative Project

    Science.gov (United States)

    Ramachandran, R.; Bugbee, K.; Tilmes, C.; Privette, A. P.

    2015-12-01

    Curation is traditionally defined as the process of collecting and organizing information around a common subject matter or a topic of interest and typically occurs in museums, art galleries, and libraries. The task of organizing data around specific topics or themes is a vibrant and growing effort in the biological sciences but to date this effort has not been actively pursued in the Earth sciences. This presentation will introduce the concept of geocuration, which we define it as the act of searching, selecting, and synthesizing Earth science data/metadata and information from across disciplines and repositories into a single, cohesive, and useful compendium.We also present the Climate Data Initiative (CDI) project as an exemplar example. The CDI project is a systematic effort to manually curate and share openly available climate data from various federal agencies. CDI is a broad multi-agency effort of the U.S. government and seeks to leverage the extensive existing federal climate-relevant data to stimulate innovation and private-sector entrepreneurship to support national climate-change preparedness. The geocuration process used in CDI project, key lessons learned, and suggestions to improve similar geocuration efforts in the future will be part of this presentation.

  19. Bringing authentic service learning to the classroom: benefits and lessons learned

    Science.gov (United States)

    Chamberlain, Leslie C.

    2016-06-01

    Project-based learning, which has gained significant attention within K-12 education, provides rich hands-on experiences for students. Bringing an element of service to the projects allow students to engage in a local or global community, providing an abundance of benefits to the students’ learning. For example, service projects build confidence, increase motivation, and exercise problem-solving and communication skills in addition to developing a deep understanding of content. I will present lessons I have learned through four years of providing service learning opportunities in my classroom. I share ideas for astronomy projects, tips for connecting and listening to a community, and helpful guidelines to hold students accountable in order to ensure a productive and educational project.

  20. United States Support Programme (USSP): Lessons Learned from the Management of Complex, Multi-Stakeholder Projects for International Safeguards

    International Nuclear Information System (INIS)

    Diaz, R.; Tackentien, J.

    2015-01-01

    This paper will review USSP experiences, lessons learned, and proposed future strategies on the management of complex projects including the Universal Non-Destructive Assay Data Acquisition Platform (UNAP) instrument development task. The focus will be on identifying lessons learned to formulate strategies to minimize risk and maximize the potential of commercial success for future complex projects. Topics planned for inclusion are: 1. Initial agreement amongst all stakeholders on the justification of the need of the development including market studies of existing/near term future COTS technology capabilities; 2. Initial confirmation that there is a market for the product other than the IAEA to reduce investment risk; 3. Agreement on an accelerated initial project schedule from request acceptance to commercial unit production including per unit cost and quantities; 4. During product development, obtaining periodic customer reaffirmation of the need and quantities for the product per the existing schedule and per unit price. (author)

  1. Assessing the impacts of implementing lean construction Evaluando los impactos de la implementación de lean construction

    Directory of Open Access Journals (Sweden)

    Luis F Alarcón

    2008-04-01

    Full Text Available Over the last 10 years an increasing number of companies have implemented lean construction practices in an attempt to improve performance in construction projects. Most companies, and also some researchers, have reported satisfactory results from their implementation. However, there is still a need to provide more extensive analysis of the empirical evidence available to assess the impact of the implementation of lean construction. The authors have researched the implementation of the Last Planner System and other Lean Construction techniques in over one hundred construction projects over the last five years. They have also developed strategies and support tools for implementation. This paper analyzes some of the main impacts observed in the studied projects, and some of the lessons learned from implementations. The paper discusses difficulties and barriers for implementation, productivity improvements, variability reduction and effectiveness of implementation strategies. The paper also provides recommendations for future implementation and researchEn los últimos 10 años un creciente número de empresas constructoras ha implementado prácticas de Lean Construction para mejorar el desempeño de sus proyectos. La mayor parte de estas empresas, y también algunos investigadores, han informado sobre buenos resultados obtenidos en los proyectos. Sin embargo, todavía es necesario un análisis más completo de la evidencia empírica disponible para evaluar así el impacto de Lean Construction en los proyectos y empresas. Los autores han investigado la implementación del Sistema Ultimo Planificador y otras técnicas de Lean Construction en mas de un centenar de proyectos en los últimos 5 años y han desarrollado estrategias y herramientas de apoyo para su implementación. Este artículo analiza algunos de los principales impactos observados en los proyectos estudiados y las lecciones aprendidas en este proceso. Se discuten dificultades y barreras

  2. Reflections on Designing a MPA Service-Learning Component: Lessons Learned

    Science.gov (United States)

    Roman, Alexandru V.

    2015-01-01

    This article provides the "lessons learned" from the experience of redesigning two sections (face-to-face and online) of a core master of public administration class as a service-learning course. The suggestions made here can be traced to the entire process of the project, from the "seed idea" through its conceptualization and…

  3. Does Lean & Agile Project Management Help Coping with Project Complexity?

    NARCIS (Netherlands)

    Jalali Sohi, A.; Hertogh, M.J.C.M.; Bosch-Rekveldt, M.G.C.; Blom, R.; Serpell, A.; Ferrada, X.

    2016-01-01

    Still, projects in the construction sector are delivered with time delays and cost overruns. One of the reasons for poor performance was assigned to project complexity. A combination of lean construction and agile project management are hypothesized as a possible solution to cope with project

  4. Lessons learned from the NRU vessel leak repair and return to service projects

    International Nuclear Information System (INIS)

    Heeney, P.; Turcotte, J.

    2011-01-01

    In May 2009 the National Research Universal (NRU) reactor was shut down due to a small leak detected from the reactor vessel into the annulus surrounding the reactor. What ensued was a challenging, yet successful, 15 month long Repair and Return to Service Outage. This Repair and Return to Service Outage presented many first-of-a-kind challenges that provide learning opportunities which have been incorporated into subsequent planned outages. These lessons learned are invaluable tools to be used in the planning and execution of future outages. Following the repair of the NRU vessel, AECL was required to conduct annual inspections of the vessel wall. These inspections require an annual Extended Outage (up to 4 weeks in length). A planned Extended Outage was conducted in May/June 2011 and provided an opportunity to implement some of the lessons learned during the Repair and Return to Service Outage. Lessons learned from that Extended Outage have been incorporated in the subsequent monthly maintenance outages, with lessons learned sessions being held after each outage to ensure that the execution of outages is constantly improving. (author)

  5. Lessons learned from early criticality accidents

    International Nuclear Information System (INIS)

    Malenfant, R.E.

    1996-01-01

    Four accidents involving the approach to criticality occurred during the period July, 1945, through May, 1996. These have been described in the format of the OPERATING EXPERIENCE WEEKLY SUMMARY which is distributed by the Office of Nuclear and Facility Safety. Although the lessons learned have been incorporated in standards, codes, and formal procedures during the last fifty years, this is their first presentation in this format. It is particularly appropriate that they be presented in the forum of the Nuclear Criticality Technology Safety Project Workshop closest to the fiftieth anniversary of the last of the four accidents, and that which was most instrumental in demonstrating the need to incorporate lessons learned

  6. Lessons learned from the NREL village power program

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, R.W. [National Renewable Energy Lab., Golden, CO (United States)

    1998-09-01

    Renewable energy solutions for village power applications can be economical, functional, and sustainable. Pilot projects are an appropriate step in the development of a commercially viable market for rural renewable energy solutions. Moreover, there are a significant number of rural electrification projects under way that employ various technologies, delivery mechanisms, and financing arrangements. These projects, if properly evaluated, communicated, and their lessons incorporated in future projects and programs, can lead the way to a future that includes a robust opportunity for cost-effective, renewable-based village power systems. This paper summarizes some of NREL`s recent experiences and lessons learned.

  7. Lessons Learned from the NREL Village Power Program

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, R.

    1998-07-01

    Renewable energy solutions for village power applications can be economical, functional, and sustainable. Pilot projects are an appropriate step in the development of a commercially viable market for rural renewable energy solutions. Moreover, there are a significant number of rural electrification projects under way that employ various technologies, delivery mechanisms, and financing arrangements. These projects, if properly evaluated, communicated, and their lessons incorporated in future projects and programs, can lead the way to a future that includes a robust opportunity for cost-effective, renewable-based village power systems. This paper summarizes some of NRELs recent experiences and lessons learned.

  8. Library 101: Why, How, and Lessons Learned

    Science.gov (United States)

    Porter, Michael; King, David Lee

    2010-01-01

    This article describes how and why the Library 101 Project was created and the lessons that the developers learned out of this project. The Library 101 is a project that challenges librarians to revise the paradigm of "basic" library services in order to remain relevant in this technology-driven world. It was developed by Michael Porter,…

  9. Lesson Learning at JPL

    Science.gov (United States)

    Oberhettinger, David

    2011-01-01

    A lessons learned system is a hallmark of a mature engineering organization A formal lessons learned process can help assure that valuable lessons get written and published, that they are well-written, and that the essential information is "infused" into institutional practice. Requires high-level institutional commitment, and everyone's participation in gathering, disseminating, and using the lessons

  10. Effects of Multiple Intelligences Supported Project-Based Learning on Students' Achievement Levels and Attitudes towards English Lesson

    Science.gov (United States)

    Bas, Gökhan; Beyhan, Ömer

    2010-01-01

    The aim of the research was to investigate the effects of multiple intelligences supported project-based learning and traditional foreign language-teaching environment on students' achievement and their attitude towards English lesson. The research was carried out in 2009-2010 education-instruction year in Karatli Sehit Sahin Yilmaz Elementary…

  11. Learning from Lessons: studying the structure and construction of mathematics teacher knowledge in Australia, China and Germany

    Science.gov (United States)

    Chan, Man Ching Esther; Clarke, David J.; Clarke, Doug M.; Roche, Anne; Cao, Yiming; Peter-Koop, Andrea

    2018-03-01

    The major premise of this project is that teachers learn from the act of teaching a lesson. Rather than asking "What must a teacher already know in order to practice effectively?", this project asks "What might a teacher learn through their activities in the classroom and how might this learning be optimised?" In this project, controlled conditions are created utilising purposefully designed and trialled lesson plans to investigate the process of teacher knowledge construction, with teacher selective attention proposed as a key mediating variable. In order to investigate teacher learning through classroom practice, the project addresses the following questions: To what classroom objects, actions and events do teachers attend and with what consequence for their learning? Do teachers in different countries attend to different classroom events and consequently derive different learning benefits from teaching a lesson? This international project combines focused case studies with an online survey of mathematics teachers' selective attention and consequent learning in Australia, China and Germany. Data include the teacher's adaptation of a pre-designed lesson, the teacher's actions during the lesson, the teacher's reflective thoughts about the lesson and, most importantly, the consequences for the planning and delivery of a second lesson. The combination of fine-grained, culturally situated case studies and large-scale online survey provides mutually informing benefits from each research approach. The research design, so constituted, offers the means to a new and scalable vision of teacher learning and its promotion.

  12. LESSONS LEARNED Biosurveillance Mobile App Development Intern Competition (Summer 2013)

    Energy Technology Data Exchange (ETDEWEB)

    Noonan, Christine F. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Henry, Michael J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Corley, Courtney D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-01-14

    The purpose of the lessons learned document for the BEOWulf Biosurveillance Mobile App Development Intern Competition is to capture the project’s lessons learned in a formal document for use by other project managers on similar future projects. This document may be used as part of new project planning for similar projects in order to determine what problems occurred and how those problems were handled and may be avoided in the future. Additionally, this document details what went well with the project and why, so that other project managers may capitalize on these actions. Project managers may also use this document to determine who the project team members were in order to solicit feedback for planning their projects in the future. This document will be formally communicated with the organization and will become a part of the organizational assets and archives.

  13. Research Data Curation Pilots: Lessons Learned

    Directory of Open Access Journals (Sweden)

    David Minor

    2014-07-01

    Full Text Available In the spring of 2011, the UC San Diego Research Cyberinfrastructure (RCI Implementation Team invited researchers and research teams to participate in a research curation and data management pilot program. This invitation took the form of a campus-wide solicitation. More than two dozen applications were received and, after due deliberation, the RCI Oversight Committee selected five curation-intensive projects. These projects were chosen based on a number of criteria, including how they represented campus research, varieties of topics, researcher engagement, and the various services required. The pilot process began in September 2011, and will be completed in early 2014. Extensive lessons learned from the pilots are being compiled and are being used in the on-going design and implementation of the permanent Research Data Curation Program in the UC San Diego Library. In this paper, we present specific implementation details of these various services, as well as lessons learned. The program focused on many aspects of contemporary scholarship, including data creation and storage, description and metadata creation, citation and publication, and long term preservation and access. Based on the lessons learned in our processes, the Research Data Curation Program will provide a suite of services from which campus users can pick and choose, as necessary. The program will provide support for the data management requirements from national funding agencies.

  14. Lessons learned in demonstration projects regarding operational safety during final disposal of vitrified waste and spent fuel

    International Nuclear Information System (INIS)

    Filbert, Wolfgang; Herold, Philipp

    2015-01-01

    The paper summarizes the lessons learned in demonstration projects regarding operational safety during the final disposal of vitrified waste and spent fuel. The three demonstration projects for the direct disposal of vitrified waste and spent fuel are described. The first two demonstration projects concern the shaft transport of heavy payloads of up to 85 t and the emplacement operations in the mine. The third demonstration project concerns the borehole emplacement operation. Finally, open issues for the next steps up to licensing of the emplacement and disposal systems are summarized.

  15. Code of Conduct for wind-power projects - Phases 1 and 2; Code of Conduct fuer windkraftprojekte. Phase 1 und 2 - Systemanalyse, Lessons Learned und Bewertung bestehender Instrumente

    Energy Technology Data Exchange (ETDEWEB)

    Strub, P. [Pierre Strub, freischaffender Berater, Binningen (Switzerland); Ziegler, Ch. [Inter Act, Basel (Switzerland)

    2008-08-15

    This paper discusses the results of the first two phases of a project concerning wind-power projects. The paper deals with the results of a system analysis, takes a look at lessons learned and presents an appraisal of existing instruments. A system-analysis of wind-power projects is presented with emphasis on social factors and the role of stakeholders. The success factors concerning social acceptance of wind-power projects and their special characteristics are discussed. Lessons learned are examined. Instruments for the sustainable implementation of projects are looked at, in particular with a focus on social acceptance

  16. Amish-Initiated Burn Care Project: Case Report and Lessons Learned in Participatory Research.

    Science.gov (United States)

    Hess, Rosanna F

    2017-03-01

    This case report describes the phases of an Amish Burn Care Project and the lessons learned throughout the process. Data sources to construct the case report included participant observation, interviews, archival documents, and a focus group. The narrative is organized into five phases of a participatory research approach: engagement, formalization, mobilization, maintenance, and expansion. Community-initiated research led to legitimate change, working together for change took time, team members grew in mutual trust and respect for each other, cultural humility brought personal and professional growth, and capacity building took place through mutually supported efforts.

  17. Lessons learned related to packaging and transportation

    International Nuclear Information System (INIS)

    Wallen, C.

    1995-01-01

    The use of lessons learned as a tool for learning from past experiences is well established, especially by many organizations within the nuclear industry. Every person has, at some time, used the principles of lessons learned to adopt good work practices based on their own experiences or the experiences of others. Lessons learned can also help to avoid the recurrence of adverse practices, which is often an area that most lessons-learned programs tend to focus on. This paper will discuss how lessons learned relate to packaging and transportation issues and events experienced at Department of Energy (DOE) facilities. It will also discuss the role performed by the Office of Nuclear and Facility Safety's Office of Operating Experience Analysis and Feedback in disseminating lessons learned and operating experience feedback to the DOE complex. The central concept of lessons learned is that any organization should be able to learn from its own experiences and events. In addition, organizations should implement methodologies to scan external environments for lessons learned, to analyze and determine the relevance of lessons learned, and to bring about the necessary changes learned from these experiences. With increased concerns toward facility safety, the importance of utilizing the lessons-learned principles and the establishment of lessons-learned programs can not be overstated

  18. Environmental assessment of nuclear projects in Canada - process, participation, lessons learned

    International Nuclear Information System (INIS)

    Underdown, G.A.; Brown, P.A.; Morrison, R.W.

    1995-01-01

    This paper documents public participation in decision-making for five cases of nuclear-based projects in Canada. Two cases involve the application of the Federal Environmental Assessment and Review Process (EARP), a formal, non-judicial process for public involvement in projects with a potential environmental impact. It is being applied to the development of new Uranium mines and the disposal of used nuclear fuels. The siting of radioactive waste facilities, generally unwanted by the communities, presents many difficult challenges which needs to be addressed before a project goes through the EARP process. An open, consultative, community-based approach to decision-making about siting is being applied in the three cases: Port Hope, Scarborough and Surrey. A number of lessons have been learned, the most important that there is a need to establish an acceptable process that includes 'getting the science right' on a project before attempting to find a site. The EARP, in most cases, provides a good mechanism for the sharing of information about a potential between the proponents and the public as long as there are no major unresolved contentious issues such as the unwanted siting of a waste facility in a particular community. 19 refs

  19. Lessons Learned by Community Stakeholders in the Massachusetts Childhood Obesity Research Demonstration (MA-CORD) Project, 2013–2014

    Science.gov (United States)

    Ganter, Claudia; Aftosmes-Tobio, Alyssa; Chuang, Emmeline; Kwass, Jo-Ann; Land, Thomas

    2017-01-01

    Introduction Childhood obesity is a multifaceted disease that requires sustainable, multidimensional approaches that support change at the individual, community, and systems levels. The Massachusetts Childhood Obesity Research Demonstration project addressed this need by using clinical and public health evidence-based methods to prevent childhood obesity. To date, little information is known about successes and lessons learned from implementing such large-scale interventions. To address this gap, we examined perspectives of community stakeholders from various sectors on successes achieved and lessons learned during the implementation process. Methods We conducted 39 semistructured interviews with key stakeholders from 6 community sectors in 2 low-income communities from November 2013 through April 2014, during project implementation. Interviews were audio-recorded, transcribed, and analyzed by using the constant comparative method. Data were analyzed by using QSR NVivo 10. Results Successes included increased parental involvement in children’s health and education, increased connections within participating organizations and within the broader community, changes in organizational policies and environments to better support healthy living, and improvements in health behaviors in children, parents, and stakeholders. Lessons learned included the importance of obtaining administrative and leadership support, involving key stakeholders early in the program planning process, creating buffers that allow for unexpected changes, and establishing opportunities for regular communication within and across sectors. Conclusion Study findings indicate that multidisciplinary approaches support health behavior change and provide insight into key issues to consider in developing and implementing such approaches in low-income communities. PMID:28125400

  20. Efficient Project Delivery Using Lean Principles - An Indian Case Study

    Science.gov (United States)

    Kovvuri, P. Ramachandra Reddy; Sawhney, Anil; Ahuja, Ritu; Sreekumar, Aiswarya

    2016-03-01

    Construction industry in India is growing at a rapid pace. Along with this growth, the industry is facing numerous challenges that are making delivery of projects inefficient. Experts believe that capacity constraints in the industry need to be addressed immediately. Government has recommended `introduction of efficient technologies and modern management techniques' to increase the productivity of the industry. In this context, lean principles can act as a lever to make project delivery more efficient and provide the much needed impetus to the Indian construction sector. Around the globe lean principles are showing positive results on the projects. Project teams are reporting improvements in construction time, cost and quality along with softer benefits of enhanced collaboration, coordination and trust in project teams. Can adoption of lean principles provide similar benefits in the Indian construction sector? This research was conducted to answer this question. Using an action research approach a key lean construction tool called Last Planner System (LPS) was tested on a large Indian construction project. The work described in this work investigates the improvements achieved in project delivery by adopting LPS in Indian construction sector. Comparison in pre- and post-implementation data demonstrates increase in the certainty of work-flow and improves schedule compliance. This is measured through a simple LPS metric called percent plan complete. Explicit improvements in schedule performance are seen during 8 week LPS implementation along with implicit improvements in coordination, collaboration and trust in the project team. This work reports the findings of LPS implementation on the case study project outlining the barriers and drivers to adoption, strategies needed to ensure successful implementation and roadmap for implementation. Based on the findings the authors envision that lean construction can make project delivery more efficient in India.

  1. Lessons learned at Lower East Fork Poplar Creek, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Burch, K.L.; Page, D.G.

    1996-01-01

    The US Department of Energy (DOE) used several innovative strategies and technologies in conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) activities for the Lower East Fork Poplar Creek (EFPC) Operable Unit (OU) in Oak Ridge, Tennessee. These innovations helped to cost-effectively characterize the 270-ha (670-acre), 23.3-km (14.5-mile) floodplain and to obtain a 400-parts per million (ppm) cleanup level for mercury in soil. Lessons learned during the project involve management, investigation, and risk assessment strategies and techniques. Management lessons learned include (a) how to handle the large OU, (b) how to effectively involve the community in decisions, and (c) how to select a remedy that incorporates the needs of many involved agencies. Investigation lessons learned include (a) how to design an effective sampling strategy for the site, (b) how to cost-effectively analyze a large number of samples, and (c) which of several treatment technologies is best-suited to the site. Risk assessment lessons learned include (a) how to determine an appropriate cleanup level for human health and the environment, (b) how to quantify uncertainty in the human health risk assessment, (c) how to reconcile different solubilities of different mercury species, and (d) how to best conduct the ecological risk assessment. Other CERCLA sites can benefit from lessons learned during this project whether still in the investigative stage or further along in the process. Applying these lessons can substantially reduce costs and make more efficient use of Superfund resources

  2. Is there a lean future for global startups?

    DEFF Research Database (Denmark)

    Tanev, Stoyan

    2017-01-01

    This article integrates insights from the latest research on the lean startup entrepreneurial method, born-global firms, and global startups. It contributes to the clarification of terminology referring to the global aspects of startups, summarizes insights from previous literature focusing on gl......-based global startup research and practice. The analysis should benefit both researchers and practitioners in technology entrepreneurship, international entrepreneurship, and global innovation management.......This article integrates insights from the latest research on the lean startup entrepreneurial method, born-global firms, and global startups. It contributes to the clarification of terminology referring to the global aspects of startups, summarizes insights from previous literature focusing...... on global startups, and further substantiates the articulation of the need for considering the lean global startup as a new type of firm. The main message is that the lessons learned from the emergence of lean startup entrepreneurship offer a basis for promoting a similar lean phase in technology...

  3. Low level waste shipment accident lessons learned

    International Nuclear Information System (INIS)

    Rast, D.M.; Rowe, J.G.; Reichel, C.W.

    1995-01-01

    On October 1, 1994 a shipment of low-level waste from the Fernald Environmental Management Project, Fernald, Ohio, was involved in an accident near Rolla, Missouri. The accident did not result in the release of any radioactive material. The accident did generate important lessons learned primarily in the areas of driver and emergency response communications. The shipment was comprised of an International Standards Organization (ISO) container on a standard flatbed trailer. The accident caused the low-level waste package to separate from the trailer and come to rest on its top in the median. The impact of the container with the pavement and median inflicted relatively minor damage to the container. The damage was not substantial enough to cause failure of container integrity. The success of the package is attributable to the container design and the packaging procedures used at the Fernald Environmental Management Project for low-level waste shipments. Although the container survived the initial wreck, is was nearly breached when the first responders attempted to open the ISO container. Even though the container was clearly marked and the shipment documentation was technically correct, this information did not identify that the ISO container was the primary containment for the waste. The lessons learned from this accident have DOE complex wide applicability. This paper is intended to describe the accident, subsequent emergency response operations, and the lessons learned from this incident

  4. PUREX/UO3 Facilities deactivation lessons learned history

    Energy Technology Data Exchange (ETDEWEB)

    Gerber, M.S.

    1996-09-19

    accompanied by and were an integral part of sweeping ``culture changes,`` the story of the lessons learned during the PUREX Deactivation Project are worth recounting. Foremost among the lessons is recognizing the benefits of ``right to left`` project planning. A deactivation project must start by identifying its end points, then make every task, budget, and organizational decision based on reaching those end points. Along with this key lesson is the knowledge that project planning and scheduling should be tied directly to costing, and the project status should be checked often (more often than needed to meet mandated reporting requirements) to reflect real-time work. People working on a successful project should never be guessing about its schedule or living with a paper schedule that does not represent the actual state of work. Other salient lessons were learned in the PUREX/UO3 Deactivation Project that support these guiding principles. They include recognizing the value of independent review, teamwork, and reengineering concepts; the need and value of cooperation between the DOE, its contractors, regulators, and stakeholders; and the essential nature of early and ongoing communication. Managing a successful project also requires being willing to take a fresh look at safety requirements and to apply them in a streamlined and sensible manner to deactivating facilities; draw on the enormous value of resident knowledge acquired by people over years and sometimes decades of working in old plants; and recognize the value of bringing in outside expertise for certain specialized tasks.This approach makes possible discovering the savings that can come when many creative options are pursued persistently and the wisdom of leaving some decisions to the future. The essential job of a deactivation project is to place a facility in a safe, stable, low-maintenance mode, for an interim period. Specific end points are identified to recognize and document this state. Keeping the limited

  5. Lessons Learned from Environmental Remediation Programmes

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-03-15

    Several remediation projects have been developed to date, and experience with these projects has been accumulated. Lessons learned span from non-technical to technical aspects, and need to be shared with those who are beginning or are facing the challenge to implement environmental remediation works. This publication reviews some of these lessons. The key role of policy and strategies at the national level in framing the conditions in which remediation projects are to be developed and decisions made is emphasized. Following policy matters, this publication pays attention to the importance of social aspects and the requirement for fairness in decisions to be made, something that can only be achieved with the involvement of a broad range of interested parties in the decision making process. The publication also reviews the funding of remediation projects, planning, contracting, cost estimates and procurement, and issues related to long term stewardship. Lessons learned regarding technical aspects of remediation projects are reviewed. Techniques such as the application of cover systems and soil remediation (electrokinetics, phytoremediation, soil flushing, and solidification and stabilization techniques) are analysed with respect to performance and cost. After discussing soil remediation, the publication covers issues associated with water treatment, where techniques such as ‘pump and treat’ and the application of permeable barriers are reviewed. Subsequently, there is a section dedicated to reviewing briefly the lessons learned in the remediation of uranium mining and processing sites. Many of these sites throughout the world have become orphaned, and are waiting for remediation. The publication notes that little progress has been made in the management of some of these sites, particularly in the understanding of associated environmental and health risks, and the ability to apply prediction to future environmental and health standards. The publication concludes

  6. Lessons Learned from Environmental Remediation Programmes

    International Nuclear Information System (INIS)

    2014-01-01

    Several remediation projects have been developed to date, and experience with these projects has been accumulated. Lessons learned span from non-technical to technical aspects, and need to be shared with those who are beginning or are facing the challenge to implement environmental remediation works. This publication reviews some of these lessons. The key role of policy and strategies at the national level in framing the conditions in which remediation projects are to be developed and decisions made is emphasized. Following policy matters, this publication pays attention to the importance of social aspects and the requirement for fairness in decisions to be made, something that can only be achieved with the involvement of a broad range of interested parties in the decision making process. The publication also reviews the funding of remediation projects, planning, contracting, cost estimates and procurement, and issues related to long term stewardship. Lessons learned regarding technical aspects of remediation projects are reviewed. Techniques such as the application of cover systems and soil remediation (electrokinetics, phytoremediation, soil flushing, and solidification and stabilization techniques) are analysed with respect to performance and cost. After discussing soil remediation, the publication covers issues associated with water treatment, where techniques such as ‘pump and treat’ and the application of permeable barriers are reviewed. Subsequently, there is a section dedicated to reviewing briefly the lessons learned in the remediation of uranium mining and processing sites. Many of these sites throughout the world have become orphaned, and are waiting for remediation. The publication notes that little progress has been made in the management of some of these sites, particularly in the understanding of associated environmental and health risks, and the ability to apply prediction to future environmental and health standards. The publication concludes

  7. The SeaView EarthCube project: Lessons Learned from Integrating Across Repositories

    Science.gov (United States)

    Diggs, S. C.; Stocks, K. I.; Arko, R. A.; Kinkade, D.; Shepherd, A.; Olson, C. J.; Pham, A.

    2017-12-01

    SeaView is an NSF-funded EarthCube Integrative Activity Project working with 5 existing data repositories* to provide oceanographers with highly integrated thematic data collections in user-requested formats. The project has three complementary goals: Supporting Scientists: SeaView targets scientists' need for easy access to data of interest that are ready to import into their preferred tool. Strengthening Repositories: By integrating data from multiple repositories for science use, SeaView is helping the ocean data repositories align their data and processes and make ocean data more accessible and easily integrated. Informing EarthCube (earthcube.org): SeaView's experience as an integration demonstration can inform the larger NSF EarthCube architecture and design effort. The challenges faced in this small-scale effort are informative to geosciences cyberinfrastructure more generally. Here we focus on the lessons learned that may inform other data facilities and integrative architecture projects. (The SeaView data collections will be presented at the Ocean Sciences 2018 meeting.) One example is the importance of shared semantics, with persistent identifiers, for key integration elements across the data sets (e.g. cruise, parameter, and project/program.) These must allow for revision through time and should have an agreed authority or process for resolving conflicts: aligning identifiers and correcting errors were time consuming and often required both deep domain knowledge and "back end" knowledge of the data facilities. Another example is the need for robust provenance, and tools that support automated or semi-automated data transform pipelines that capture provenance. Multiple copies and versions of data are now flowing into repositories, and onward to long-term archives such as NOAA NCEI and umbrella portals such as DataONE. Exact copies can be identified with hashes (for those that have the skills), but it can be painfully difficult to understand the processing

  8. TMI-2: Lessons learned by the US Department of Energy: A programmatic perspective

    International Nuclear Information System (INIS)

    Schmitt, R.C.; Reno, H.W.; Bentley, K.J.; Owens, D.E.

    1990-03-01

    This report is a summary of the lessons learned by the US Department of Energy during its decade-long participation in the research and accident cleanup project at Three Mile Island Nuclear Power Station Unit 2 near Harrisburg, Pennsylvania. It is based on a review of a wide range of project documents and interviews with personnel from the many organizations involved. The lessons are organized into major subjects with a brief background section to orient the reader to that subject. The subjects are divided into sub-topics, each with a brief discussion and a series of lessons learned. The lessons are very brief and each is preceded with a keyword phrase to highlight its specific topic. References are given so that the details of the subject and the lesson can be further investigated. 99 refs., 24 figs

  9. Preservation and Implementation of Decommissioning Lessons Learned in the United States Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    Rodriguez, Rafael L.

    2008-01-01

    Over the past several years, the United States Nuclear Regulatory Commission (NRC) has actively worked to capture and preserve lessons learned from the decommissioning of nuclear facilities. More recently, NRC has involved industry groups, the Organization of Agreement States (OAS), and the Department of Energy (DOE) in the effort to develop approaches to capture, preserve and disseminate decommissioning lessons learned. This paper discusses the accomplishments of the working group, some lessons learned by the NRC in the recent past, and how NRC will incorporate these lessons learned into its regulatory framework. This should help ensure that the design and operation of current and future nuclear facilities will result in less environmental impact and more efficient decommissioning. In summary, the NRC will continue capturing today's experience in decommissioning so that future facilities can take advantage of lessons learned from today's decommissioning projects. NRC, both individually and collectively with industry groups, OAS, and DOE, is aggressively working on the preservation and implementation of decommissioning lessons learned. The joint effort has helped to ensure the lessons from the whole spectrum of decommissioning facilities (i.e., reactor, fuel cycle, and material facilities) are better understood, thus maximizing the amount of knowledge and best practices obtained from decommissioning activities. Anticipated regulatory activities at the NRC will make sure that the knowledge gained from today's decommissioning projects is preserved and implemented to benefit the nuclear facilities that will decommission in the future

  10. Lessons Learned from the Private Sector

    Energy Technology Data Exchange (ETDEWEB)

    Robichaud, Robert J [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2017-09-07

    This session is focused on lessons learned from private sector energy projects that could be applied to the federal sector. This presentation tees up the subsequent presentations by outlining the differences between private and federal sectors in objectives, metrics for determining success, funding resources/mechanisms, payback and ROI evaluation, risk tolerance/aversion, new technology adoption perspectives, and contracting mechanisms.

  11. Lessons Learned from Developing a Patient Engagement Panel: An OCHIN Report.

    Science.gov (United States)

    Arkind, Jill; Likumahuwa-Ackman, Sonja; Warren, Nate; Dickerson, Kay; Robbins, Lynn; Norman, Kathy; DeVoe, Jennifer E

    2015-01-01

    There is renewed interest in patient engagement in clinical and research settings, creating a need for documenting and publishing lessons learned from efforts to meaningfully engage patients. This article describes early lessons learned from the development of OCHIN's Patient Engagement Panel (PEP). OCHIN supports a national network of more than 300 community health centers (CHCs) and other primary care settings that serve over 1.5 million patients annually across nearly 20 states. The PEP was conceived in 2009 to harness the CHC tradition of patient engagement in this new era of patient-centered outcomes research and to ensure that patients were engaged throughout the life cycle of our research projects, from conception to dissemination. Developed by clinicians and researchers within our practice-based research network, recruitment of patients to serve as PEP members began in early 2012. The PEP currently has a membership of 18 patients from 3 states. Over the past 24 months, the PEP has been involved with 12 projects. We describe developing the PEP and challenges and lessons learned (eg, recruitment, funding model, creating value for patient partners, compensation). These lessons learned are relevant not only for research but also for patient engagement in quality improvement efforts and other clinical initiatives. © Copyright 2015 by the American Board of Family Medicine.

  12. Community Learning Campus: It Takes a Simple Message to Build a Complex Project

    Science.gov (United States)

    Pearson, George

    2012-01-01

    Education Canada asked Tom Thompson, president of Olds College and a prime mover behind the Community Learning Campus (CLC): What were the lessons learned from this unusually ambitious education project? Thompson mentions six lessons he learned from this complex project which include: (1) Dream big, build small, act now; (2) Keep a low profile at…

  13. Bringing Lean Six Sigma to the Supply Chain Classroom: A Problem-Based Learning Case

    Science.gov (United States)

    Miller, Keith E.; Hill, Craig; Miller, Antoinette R.

    2016-01-01

    The article describes a project that employs problem-based learning (PBL) to teach the Lean Six Sigma (LSS) methodology as part of an undergraduate or graduate business course. It is scalable to a variety of course delivery and schedule formats, and uses data sets that can create distinct problem-solving scenarios for up to 16 student teams. It…

  14. Contractor Work Preparation Process Improvement Using Lean Six Sigma

    Directory of Open Access Journals (Sweden)

    Asana Kusnadi

    2016-06-01

    Full Text Available To ensure the health and safety of their workforce and protection of their assets and the environment, a global oil and gas company operating in Indonesia requires comprehensive identification and evaluation of job hazards that were included in work permitting process prior work execution in the field. Based on 20 data points obtained in August 2013, start-working time for contractors who worked for Capital Project Management (CPM Team in Facility B was in average at 09.05 a.m. The aim of this paper is to present how the firm implemented Lean Six Sigma to reduce non-added value activities while fulfilling to its safety requirements and to share lessons learned from practical and theory testing perspective. The methodology used is Lean Six Sigma’s DMAIC (Define, Measure, Analyze, Improve, Control as mandated by the corporate policy of the firm. This research adopts a mix-methods approach, by using both qualitative and quantitative data. This study was a one year longitudinal study of the Lean Six Sigma implementation to improve contractors’ work preparation process. The improvement resulted in reduction of non-value added activities and successfully increased the available working time per day by 59.3 minutes in average. The results of this case study reconfirm Lean Six Sigma as a good management theory since it shows a consistency between the theory and the real practice in a global oil and gas company in Indonesia.

  15. Defining a risk-informed framework for whole-of-government lessons learned: A Canadian perspective.

    Science.gov (United States)

    Friesen, Shaye K; Kelsey, Shelley; Legere, J A Jim

    Lessons learned play an important role in emergency management (EM) and organizational agility. Virtually all aspects of EM can derive benefit from a lessons learned program. From major security events to exercises, exploiting and applying lessons learned and "best practices" is critical to organizational resilience and adaptiveness. A robust lessons learned process and methodology provides an evidence base with which to inform decisions, guide plans, strengthen mitigation strategies, and assist in developing tools for operations. The Canadian Safety and Security Program recently supported a project to define a comprehensive framework that would allow public safety and security partners to regularly share event response best practices, and prioritize recommendations originating from after action reviews. This framework consists of several inter-locking elements: a comprehensive literature review/environmental scan of international programs; a survey to collect data from end users and management; the development of a taxonomy for organizing and structuring information; a risk-informed methodology for selecting, prioritizing, and following through on recommendations; and standardized templates and tools for tracking recommendations and ensuring implementation. This article discusses the efforts of the project team, which provided "best practice" advice and analytical support to ensure that a systematic approach to lessons learned was taken by the federal community to improve prevention, preparedness, and response activities. It posits an approach by which one might design a systematic process for information sharing and event response coordination-an approach that will assist federal departments to institutionalize a cross-government lessons learned program.

  16. Scheduling lessons learned from the Autonomous Power System

    Science.gov (United States)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA LeRC is designed to demonstrate the applications of integrated intelligent diagnosis, control, and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The AIPS scheduler was tested within the APS system. This scheduler is able to efficiently assign available power to the requesting activities and share this information with other software agents within the APS system in order to implement the generated schedule. The AIPS scheduler is also able to cooperatively recover from fault situations by rescheduling the affected loads on the Brassboard in conjunction with the APEX FDIR system. AIPS served as a learning tool and an initial scheduling testbed for the integration of FDIR and automated scheduling systems. Many lessons were learned from the AIPS scheduler and are now being integrated into a new scheduler called SCRAP (Scheduler for Continuous Resource Allocation and Planning). This paper will service three purposes: an overview of the AIPS implementation, lessons learned from the AIPS scheduler, and a brief section on how these lessons are being applied to the new SCRAP scheduler.

  17. Lessons learned from existing biomass power plants

    Energy Technology Data Exchange (ETDEWEB)

    Wiltsee, G.

    2000-02-24

    This report includes summary information on 20 biomass power plants, which represent some of the leaders in the industry. In each category an effort is made to identify plants that illustrate particular points. The project experiences described capture some important lessons learned that lead in the direction of an improved biomass power industry.

  18. Learning to observe mathematical learning in lesson studies

    DEFF Research Database (Denmark)

    Rasmussen, Klaus; Østergaard, Camilla Hellsten; Foss, Kristian Kildemoes

    2016-01-01

    This poster deals with lesson study (LS) in pre-service teacher education. In particular how to prepare for, carry out, and reflect upon, observations of pupil learning. Observation is of crucial importance to the lesson study process, and here we present a study of observation features which ena...... enable or hinder fruitful lesson study. While substantial research has been carried out in the general field of bserving pupils’ learning processes and teachers’ pedagogical practice, little is known about this in the particular setting of lesson study....

  19. Innovation in the management of lessons learned in an IT project with the adoption of social media

    Directory of Open Access Journals (Sweden)

    Roberto Winter

    2017-03-01

    Full Text Available This research explores the gap in the management of lessons learned (MLL in an Information Technology project (IT, validating a model (named Target with the support of a wiki platform in a medium-sized company in the IT industry. This model supports the following MLL processes: awareness, collection, verification, storage, dissemination and reuse. This study adopts the paradigm of the Design Science Research and the Technical Action Research method to instantiate the Target model in the implementation phase of an IT project. The theoretical contribution lies in the practical utility of an LL model, which was validated in the field promoting innovation in the MLL. The practical implications can be seen in the company's learning to introduce the MLL, improve design productivity, increase employee collaboration and better disseminate knowledge.

  20. TMI-2 lessons have been learned

    International Nuclear Information System (INIS)

    Long, R.L.

    1994-01-01

    This paper is an introduction to the more detailed papers which are presented in this session titled ''Advanced Light Water Reactors -- 15 Years After TMI.'' Many of the advances in the design, operation and maintenance of nuclear power plants are the direct result of applying lessons learned from the 1979 TMI-2 accident. The authors believe the ''reality awakening'' which occurred following the accident should never be forgotten. Thus, this paper briefly reviews the TMI-2 accident and identifies the broad lessons learned following the accident. Then it describes briefly some indicators which show the very impressive improvements in nuclear power plant performance that have occurred over the past 10-15 years. This sets the stage for Dr. Ransom's paper which shows the continuing need for nuclear power, Dr. Beckjord's paper which describes the ''final'' TMI-2 research project and the subsequent papers which focus on advanced light water reactor developments

  1. LESSONS LEARNED THROUGH OPTIMIZATION OF THE VOLUNTARY CORRECTIVE ACTION PROCESS

    International Nuclear Information System (INIS)

    Thacker, M. S.; Freshour, P.; McDonald, W.

    2002-01-01

    Valuable experience in environmental remediation was gained at Sandia National Laboratories/New Mexico (Sandia) by concurrently conducting Voluntary Corrective Actions (VCAs) at three Solid Waste Management Units (SWMUs). Sandia combined the planning, implementation, and reporting phases of three VCAs with the goal of realizing significant savings in both cost and schedule. The lessons learned through this process have been successfully implemented within the Sandia Environmental Restoration (ER) Project and could be utilized at other locations with multiple ER sites. All lessons learned resulted from successful teaming with the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB), Sandia management, a Sandia risk assessment team, and Sandia waste management personnel. Specific lessons learned included the following: (1) potential efficiencies can be exploited by reprioritization and rescheduling of activities; (2) cost and schedule reductions can be realized by combining similar work at contiguous sites into a single effort; (3) working with regulators to develop preliminary remediation goals (PRGs) and gain regulatory acceptance for VCA planning prior to project initiation results in significant time savings throughout the remediation and permit modification processes; (4) effective and thoughtful contingency planning removes uncertainties and defrays costs so that projects can be completed without interruption; (5) timely collection of waste characterization samples allows efficient disposal of waste streams, and (6) concurrent reporting of VCA activities results in significant savings in time for the authors and reviewers

  2. Understanding lean & safety projects: analysis of case studies

    Directory of Open Access Journals (Sweden)

    Maria Crema

    2017-12-01

    Full Text Available Facing the current socio-economic contingency while guaranteeing a high level of care quality is particularly challenging in the field of healthcare. Through an integrated adoption of emerging managerial solutions, projects that allow organizations to achieve both efficiency and patient safety improvements could be implemented, thereby transposing policy directives towards a safer and more sustainable healthcare system. Therefore, the purpose of this paper is to investigate the features of Lean & Safety (L&S projects. Three Health Lean Management (HLM projects that had unexpected patient safety results were selected from the same region. Differences and similarities among the cases have been highlighted and interesting points of evidence have been noted. Despite the fact that the projects were pursuing similar objectives and benefiting from comparable support, the obtained changes had direct impact on patient safety enhancement in the cases that involved the front-office processes, and an indirect impact on patient safely for the L&S project that focused on back-office activities. The implementation processes and the Information and Communication Technologies (ICT adoption of the cases are also different.

  3. Integrating gender into natural resources management projects: USAID lessons learned.

    Science.gov (United States)

    1998-01-01

    This article discusses USAID's lessons learned about integrating gender into natural resource management (NRM) projects in Peru, the Philippines, and Kenya. In Peru, USAID integrated women into a solid waste management project by lending money to invest in trash collection supplies. The loans allowed women to collect household waste, transfer it to a landfill, and provide additional sanitary disposal. The women were paid through direct fees from households and through service contracts with municipalities. In Mindanao, the Philippines, women were taught about the health impact of clean water and how to monitor water quality, including the monitoring of E. coli bacteria. Both men and women were taught soil conservation techniques for reducing the amount of silt running into the lake, which interferes with the generation of electricity and affects the health of everyone. The education helped women realize the importance of reducing silt and capitalized on their interest in protecting the health of their families. The women were thus willing to monitor the lake's water quality to determine if the conservation efforts were effective. In Kenya, USAID evaluated its Ecology, Community Organization, and Gender project in the Rift Valley, which helped resettle a landless community and helped with sustainable NRM. The evaluation revealed that women's relative bargaining power was less than men's. Organized capacity building that strengthened women's networks and improved their capacity to push issues onto the community agenda assured women a voice in setting the local NRM agenda.

  4. The Dynamics of Project-Based Learning Extension Courses: The "Laboratory of Social Projects" Case Study

    Science.gov (United States)

    Arantes do Amaral, Joao Alberto

    2017-01-01

    In this case study we discuss the dynamics that drive a free-of-charge project-based learning extension course. We discuss the lessons learned in the course, "Laboratory of Social Projects." The course aimed to teach project management skills to the participants. It was conducted from August to November of 2015, at Federal University of…

  5. Lean Development with the Morpheus Simulation Software

    Science.gov (United States)

    Brogley, Aaron C.

    2013-01-01

    The Morpheus project is an autonomous robotic testbed currently in development at NASA's Johnson Space Center (JSC) with support from other centers. Its primary objectives are to test new 'green' fuel propulsion systems and to demonstrate the capability of the Autonomous Lander Hazard Avoidance Technology (ALHAT) sensor, provided by the Jet Propulsion Laboratory (JPL) on a lunar landing trajectory. If successful, these technologies and lessons learned from the Morpheus testing cycle may be incorporated into a landing descent vehicle used on the moon, an asteroid, or Mars. In an effort to reduce development costs and cycle time, the project employs lean development engineering practices in its development of flight and simulation software. The Morpheus simulation makes use of existing software packages where possible to reduce the development time. The development and testing of flight software occurs primarily through the frequent test operation of the vehicle and incrementally increasing the scope of the test. With rapid development cycles, risk of loss of the vehicle and loss of the mission are possible, but efficient progress in development would not be possible without that risk.

  6. Rock slopes and reservoirs - lessons learned

    International Nuclear Information System (INIS)

    Moore, D.P.

    1999-01-01

    Lessons learned about slope stability in the course of four decades of monitoring, and in some cases stabilizing, slopes along British Columbia's hydroelectric reservoirs are discussed. The lessons are illustrated by short case histories of some of the more important slopes such as Little Chief Slide, Dutchman's Ridge, Downie Slide, Checkerboard Creek and Wahleach. Information derived from the monitoring and other investigations are compared with early interpretations of geology and slope performance. The comparison serves as an indicator of progress in slope stability determination and as a measure of the value of accumulated experience in terms of the potential consequences to safety and cost savings over the long life-span of hydroelectric projects.14 refs., 2 tabs., 15 figs

  7. Lessons learned from solar energy projects in Saudi Arabia

    International Nuclear Information System (INIS)

    Huraib, F.S.; Hasnain, S.M.; Alawaji, S.H.

    1996-01-01

    This paper describes the lessons learned from the major RD and D activities at Energy Research Institute (ERI), King Abdulaziz City for Science and Technology (KACST) in the field of solar energy. Photovoltaic, solar thermal dishes, solar water heating, solar water pumping and desalination, solar hydrogen production and utilization are some of the areas studied for solar energy applications. Recommendations and guidelines for future solar energy research, development, demonstration and dissemination in Saudi Arabia are also given. (Author)

  8. Missing links between lean startup, design thinking, and experiential learning approaches in entrepreneurship education

    DEFF Research Database (Denmark)

    Ramsgaard, Michael Breum; Christensen, Marie Ernst

    2016-01-01

    Questions we care about • How do different pedagogical teaching approaches in entrepreneurship education construct learning outcome when comparing the underlying pedagogical models? • Where can unidentified fields and correlations of pedagogical insights between the approaches of lean startup......, design thinking, and experiential learning be identified? • How can new concepts of learning models, taking lean startup, design thinking and experiential learning approaches into account, be developed in entrepreneurship education? Approach This 3e conference paper begins as a conceptual paper...... highlighting the theories and underlying learning models behind three pedagogical approaches within entrepreneurship education, namely lean startup, design thinking and experiential learning. The paper builds this knowledge framework in order to set the design for an empirical investigation of the proposed...

  9. Energy efficiency and renewable energies: first lessons learned from AFD and FFEM funding

    International Nuclear Information System (INIS)

    Ries, Alain; Dubus, Koulm; Naudet, Jean David

    2008-04-01

    The French Agency for Development (AFD) has been always more involved in projects dealing with issues related to global warming, and more particularly in projects aiming at developing energy efficiency and renewable energies, these projects involved different expertises (energy, urban planning, transports, agriculture, and so on). In order to highlight lessons learned from these diversity of projects and interventions, this report first proposes an analysis of these projects related to energy efficiency and renewable energies in terms of concerned sectors, of intervener, of funding type, and of evolution in time. Then, the authors highlight lessons learned in terms of project starting conditions (national framework, funding, technical abilities, social and environmental factors), in terms of funding conditions for these projects (concessional financing, specialised credit lines), and in terms of climatic impact assessment and of criteria of project selection (practices and reductions of greenhouse gas emissions, improvement of the climatic impact for project financed by the AFD)

  10. Generic Lean Six Sigma project definitions in financial services

    NARCIS (Netherlands)

    de Koning, H.; de Mast, J.; Does, R.J.M.M.; Vermaat, T.; Simons, S.

    2008-01-01

    Lean Six Sigma (LSS) is applied in financial service organizations to improve operational efficiency and effectiveness. LSS prescribes that these improvements are designed and implemented by projects. The purpose of this article is to facilitate the process of defining LSS projects in finance,

  11. Progress and Lessons Learned in Transuranic Waste Disposition at The Department of Energy's Advanced Mixed Waste Treatment Project

    International Nuclear Information System (INIS)

    J.D. Mousseau; S.C. Raish; F.M. Russo

    2006-01-01

    This paper provides an overview of the Department of Energy's (DOE) Advanced Mixed Waste Treatment Project (AMWTP) located at the Idaho National Laboratory (INL) and operated by Bechtel BWXT Idaho, LLC(BBWI) It describes the results to date in meeting the 6,000-cubic-meter Idaho Settlement Agreement milestone that was due December 31, 2005. The paper further describes lessons that have been learned from the project in the area of transuranic (TRU) waste processing and waste certification. Information contained within this paper would be beneficial to others who manage TRU waste for disposal at the Waste Isolation Pilot Plant (WIPP)

  12. Planning geometry lessons with learning platforms

    DEFF Research Database (Denmark)

    Tamborg, Andreas Lindenskov

    mathematics teachers’ joint planning of a lesson in geometry with a learning platform called Meebook is analyzed using the instrumental approach. It is concluded that the interface in Meebook orients the teachers work toward what the students should do rather than what they should learn, although the latter......This paper investigates how mathematics teachers plan lessons with a recently implemented Danish learning platform designed to support teachers in planning lessons in line with a recent objective-oriented curriculum. Drawing on data from observations of and interviews with teachers, three...... is a key intention behind the implementation of the platform. It is also concluded that when the teachers succeed in using learning objectives actively in their planning, the objectives support the teachers in designing lessons that correspond with their intentions. The paper concludes with a discussion...

  13. High Temperature Gas-Cooled Reactors Lessons Learned Applicable to the Next Generation Nuclear Plant

    Energy Technology Data Exchange (ETDEWEB)

    J. M. Beck; L. F. Pincock

    2011-04-01

    The purpose of this report is to identify possible issues highlighted by these lessons learned that could apply to the NGNP in reducing technical risks commensurate with the current phase of design. Some of the lessons learned have been applied to the NGNP and documented in the Preconceptual Design Report. These are addressed in the background section of this document and include, for example, the decision to use TRISO fuel rather than BISO fuel used in the Peach Bottom reactor; the use of a reactor pressure vessel rather than prestressed concrete found in Fort St. Vrain; and the use of helium as a primary coolant rather than CO2. Other lessons learned, 68 in total, are documented in Sections 2 through 6 and will be applied, as appropriate, in advancing phases of design. The lessons learned are derived from both negative and positive outcomes from prior HTGR experiences. Lessons learned are grouped according to the plant, areas, systems, subsystems, and components defined in the NGNP Preconceptual Design Report, and subsequent NGNP project documents.

  14. Lessons learned in applying function analysis

    International Nuclear Information System (INIS)

    Mitchel, G.R.; Davey, E.; Basso, R.

    2001-01-01

    This paper summarizes the lessons learned in undertaking and applying function analysis based on the recent experience of utility, AECL and international design and assessment projects. Function analysis is an analytical technique that can be used to characterize and asses the functions of a system and is widely recognized as an essential component of a 'systematic' approach to design, on that integrated operational and user requirements into the standard design process. (author)

  15. Writing Assignments in Disguise: Lessons Learned Using Video Projects in the Classroom

    Science.gov (United States)

    Wade, P.; Courtney, A.

    2012-12-01

    This study describes the instructional approach of using student-created video documentaries as projects in an undergraduate non-science majors' Energy Perspectives science course. Four years of teaching this course provided many reflective teaching moments from which we have enhanced our instructional approach to teaching students how to construct a quality Ken Burn's style science video. Fundamental to a good video documentary is the story told via a narrative which involves significant writing, editing and rewriting. Many students primarily associate a video documentary with visual imagery and do not realize the importance of writing in the production of the video. Required components of the student-created video include: 1) select a topic, 2) conduct research, 3) write an outline, 4) write a narrative, 5) construct a project storyboard, 6) shoot or acquire video and photos (from legal sources), 7) record the narrative, 8) construct the video documentary, 9) edit and 10) finalize the project. Two knowledge survey instruments (administered pre- and post) were used for assessment purposes. One survey focused on the skills necessary to research and produce video documentaries and the second survey assessed students' content knowledge acquired from each documentary. This talk will focus on the components necessary for video documentaries and the instructional lessons learned over the years. Additionally, results from both surveys and student reflections of the video project will be shared.

  16. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    Science.gov (United States)

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  17. Implementing US Department of Energy lessons learned programs. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The DOE Lessons Learned Handbook is a two-volume publication developed to supplement the DOE Lessons Learned Standard (DOE-STD-7501-95) with information that will organizations in developing or improving their lessons learned programs. Volume 1 includes greater detail than the Standard in areas such as identification and documentation of lessons learned; it also contains sections on specific processes such as training and performance measurement. Volume 2 (this document) contains examples of program documents developed by existing lessons learned programs as well as communications material, functional categories, transmittal documents, sources of professional and industry lessons learned, and frequently asked questions about the Lessons Learned List Service.

  18. Implementation of lean thinking: one health system's journey.

    Science.gov (United States)

    Kim, Christopher S; Spahlinger, David A; Kin, Jeanne M; Coffey, Richard J; Billi, John E

    2009-08-01

    Lean Thinking is a management philosophy derived from the manufacturing industry, where Toyota has long been the gold standard. Health care organizations have started to apply this approach to patient care. After initial experimentation, the University of Michigan Health System (UMHS) has adopted Lean Thinking as its uniform approach to quality improvement and is striving to become a complete Lean organization. In 2005, the senior leadership selected an initial set of projects in areas that traced the patient's journey across different care settings within our health system. Four of the projects were as follows: orthopedic surgery clinic scheduling, radiation oncology therapy, peripherally inserted central catheter (PICC) services, and coordination of care to the outpatient setting. Lean Thinking encourages service providers to focus on value as defined by the customer and the relentless elimination of waste that impedes the flow of value. A series of learning projects were conducted to test whether Lean methods would work at UMHS. The following factors were found to be key to LEAN PROJECT SUCCESS: expert guidance for initial efforts, leadership in the form of clinical champions and senior management support of the improvement work, frontline worker engagement in mapping out "current state" processes, identifying waste and designing an improved "future state," using metrics to develop and track interventions, and defining realistic project scope. As UMHS's experience applying Lean Thinking to our patient care processes has grown, so have support, enthusiasm, and expertise within the organization. UMHS's Lean Thinking system, now known as the Michigan Quality System, has emerged as the core improvement strategy.

  19. Implementation of lean construction techniques for minimizing the risks effect on project construction time

    Directory of Open Access Journals (Sweden)

    Usama Hamed Issa

    2013-12-01

    Full Text Available The construction projects involve various risk factors which have various impacts on time objective that may lead to time-overrun. This study suggests and applies a new technique for minimizing risk factors effect on time using lean construction principles. The lean construction is implemented in this study using the last planner system through execution of an industrial project in Egypt. Evaluating the effect of using the new tool is described in terms of two measurements: Percent Expected Time-overrun (PET and Percent Plan Completed (PPC. The most important risk factors are identified and assessed, while PET is quantified at the project start and during the project execution using a model for time-overrun quantification. The results showed that total project time is reduced by 15.57% due to decreasing PET values, while PPC values improved. This is due to minimizing and mitigating the effect of most of the risk factors in this project due to implementing lean construction techniques. The results proved that the quantification model is suitable for evaluating the effect of using lean construction techniques. In addition, the results showed that average value of PET due to factors affected by lean techniques represents 67% from PET values due to all minimized risk factors.

  20. Development of a harmonized approach to safety assessment of decommissioning: Lessons learned from international experience (DeSa project)

    International Nuclear Information System (INIS)

    Percival, K.; Nokhamzon, J.-G.; Ferch, R.; Batandjieva, B.

    2006-01-01

    The number of nuclear facilities being or planned to be shutdown as they reach the end of their design life, due to accidents or other political and social factors has been increasing worldwide. This has led to an increase in the awareness of regulators and operators of the importance of development and implementation of adequate safety requirements and criteria for decommissioning of these facilities. A general requirement at international and national levels, even for new facilities to be commissioned, is the development of a decommissioning plan, which includes evaluation of potential radiological consequences to public and workers during planned and accidental decommissioning activities. Experience has been gained in the safety assessment of decommissioning at various sites with different complexities and hazard potentials. This experience shows that various approaches have been used in conducting safety assessments and that there is a need for harmonisation of these approaches and for transferring the good practice and lessons learned to other countries, in particular developing countries with limited financial and human resources. The IAEA launched an international project on Evaluation and Demonstration of Safety during Decommissioning (DeSa) in 2004 to provide a forum for exchange of lessons learned between site operators, regulators, safety assessors and other specialists in safety assessment of decommissioning of nuclear power plants, research reactors, laboratories, nuclear fuel cycle facilities, etc. This paper presents the lessons learned through the project up to date, i.e.; (i) a common approach to safety assessment is being applied worldwide with the following steps - establishment of assessment framework; description of the facility; definition of decommissioning activities; hazard identification and analysis; calculation of consequences; and analysis of results; (ii) a deterministic approach to safety assessment is most commonly applied; (iii) a

  1. Integrating self-regulated learning and discovery learning into English lesson plan

    Directory of Open Access Journals (Sweden)

    Sayukti Ni Kadek Heny

    2018-01-01

    Full Text Available The notion of learner-centeredness has been embedded in the National Curriculum of Indonesia, 2013 Curriculum. However, most of the teachers seem to be hardly acquainted with the concept of Self-Regulated Learning (SRL and discovery learning in the lesson planning. Considering the phenomenon, this study intends to explore the concept of Self-Regulated Learning in the lesson plan of English subject for a tenth-grade level by employing a qualitative design with data obtained from a teacher-made lesson plan and a semi-structured interview. The researcher used content analysis to analyze the lesson plan. Meanwhile, the qualitative data from interview result were preceded through a coding sheet and transcribed modified figure. The findings revealed an integration of SRL cyclical phase and discovery learning in the teacher-made lesson plan. Based on the discussion, the results need to be applied in a considerably large context, in order to see thoroughly dynamic integration between Self-Regulated Learning model, lesson planning and the concept of learner autonomy.

  2. PUREX/UO3 facilities deactivation lessons learned history

    International Nuclear Information System (INIS)

    Gerber, M.S.

    1997-01-01

    In May 1997, a historic deactivation project at the PUREX (Plutonium URanium EXtraction) facility at the Hanford Site in south-central Washington State concluded its activities (Figure ES-1). The project work was finished at $78 million under its original budget of $222.5 million, and 16 months ahead of schedule. Closely watched throughout the US Department of Energy (DOE) complex and by the US Department of Defense for the value of its lessons learned, the PUREX Deactivation Project has become the national model for the safe transition of contaminated facilities to shut down status

  3. Systems Thinking, Lean Production and Action Learning

    Science.gov (United States)

    Seddon, John; Caulkin, Simon

    2007-01-01

    Systems thinking underpins "lean" management and is best understood through action-learning as the ideas are counter-intuitive. The Toyota Production System is just that--a system; the failure to appreciate that starting-place and the advocacy of "tools" leads many to fail to grasp what is, without doubt, a significant…

  4. Lessons learned in digital upgrade projects digital control system implementation at US nuclear power stations

    International Nuclear Information System (INIS)

    Kelley, S.; Bolian, T. W.

    2006-01-01

    AREVA NP has gained significant experience during the past five years in digital upgrades at operating nuclear power stations in the US. Plants are seeking modernization with digital technology to address obsolescence, spare parts availability, vendor support, increasing age-related failures and diminished reliability. New systems offer improved reliability and functionality, and decreased maintenance requirements. Significant lessons learned have been identified relating to the areas of licensing, equipment qualification, software quality assurance and other topics specific to digital controls. Digital control systems have been installed in non safety-related control applications at many utilities within the last 15 years. There have also been a few replacements of small safety-related systems with digital technology. Digital control systems are proving to be reliable, accurate, and easy to maintain. Digital technology is gaining acceptance and momentum with both utilities and regulatory agencies based upon the successes of these installations. Also, new plants are being designed with integrated digital control systems. To support plant life extension and address obsolescence of critical components, utilities are beginning to install digital technology for primary safety-system replacement. AREVA NP analyzed operating experience and lessons learned from its own digital upgrade projects as well as industry-wide experience to identify key issues that should be considered when implementing digital controls in nuclear power stations

  5. Negotiating Lean

    DEFF Research Database (Denmark)

    Rahbek Pedersen, Esben; Muniche, Mahad

    2011-01-01

    Purpose – The purpose of this paper is to analyse how negotiations between the constituencies affect the processes and outcomes of lean projects in Danish public sector organisations. Design/methodology/approach – The paper is based on a qualitative analysis of interviews with managers...... projects in the Danish public sector. It cannot be concluded that the findings can be generalised to reflect all types of lean projects across organisational and geographical settings. Originality/value – The paper adds value to the relatively scarce literature on lean management in the public sector...... and employees who have participated in lean projects in the Danish public sector. Negotiated order theory serves as the overarching theoretical framework for the analysis. Findings – The paper concludes that the processes and outcomes of lean depend not only on the technology itself, but also the negotiation...

  6. Learning from Experience Case Studies of the Hyper-X Project

    Science.gov (United States)

    Peebles, Curtis

    2009-01-01

    The Hyper-X project (X-43A) provides a number of "lessons learned" which can be applied to other aerospace project. The specific areas examined were the selection of the goals of the Hyper-X. How the technical unknowns and assumptions were handled. The final lesson was the ambiguous nature of risk assessment, and how trying to remove a technical unknown can have unintended consequences.

  7. Fernald closure project - Lessons learned in the execution of this successful project, completed October 2006

    International Nuclear Information System (INIS)

    Murphy, Cornelius; Reising, Johnny

    2007-01-01

    Available in abstract form only. Full text of publication follows: This paper explores the history and lessons learned on the United States' Department of Energy's (DoE's) Fernald Closure Project - from the completion of the uranium-production mission to the implementation of the Records of Decision defining the cleanup standards and the remedies that were achieved. Cleaning up Fernald and returning it to the people of Ohio was a $4.4 billion dollar mega environmental-remediation project that was completed in October 2006. During a period of nearly 37 years, Fernald produced 250,000 tons of high-purity, low-enriched uranium for the U.S. defense program, generating more than six million tons of liquid and solid waste as it carried out its Cold War mission. The facility was shut down in 1989 and clean up began in 1992, when Fluor won the contract to clean up the site. The project comprised four phases: 1. Determining the extent of damage to the environment and groundwater at, and adjacent to, the production facilities 2. Selecting cleanup criteria - final end states that had to be met to protect human health and the environment 3. Selecting and implementing the remedial actions that would meet the cleanup goals 4. Doing the work safely, compliantly and cost-effectively. In the project's early stages, there were strained relationships and total distrust between the local community and the DOE as a result of aquifer contamination and potential health effects to the workers and local residents. (authors)

  8. Effects of multiple intelligences supported project-based learning on students’ achievement levels and attitudes towards English lesson

    Directory of Open Access Journals (Sweden)

    Gökhan Baş

    2007-07-01

    Full Text Available The aim of the research was to investigate the effects of multiple intelligences supported project-based learning and traditional foreign language-teaching environment on students’ achievement and their attitude towards English lesson. The research was carried out in 2009 – 2010 education-instruction year in Karatli Sehit Sahin Yilmaz Elementary School, Nigde, Turkey. Totally 50 students in two different classes in the 5th grade of this school participated in the study. The results of the research showed a significant difference between the attitude scores of the experiment group and the control group. It was also found out that the multiple intelligences approach activities were more effective in the positive development of the students’ attitudes. At the end of the research, it is revealed that the students who are educated by multiple intelligences supported project-based learning method are more successful and have a higher motivation level than the students who are educated by the traditional instructional methods.

  9. Effects of multiple intelligences supported project-based learning on students’ achievement levels and attitudes towards English lesson

    Directory of Open Access Journals (Sweden)

    Gökhan BAŞ

    2010-07-01

    Full Text Available The aim of the research was to investigate the effects of multiple intelligences supported project-based learning and traditional foreign language-teaching environment on students' achievement and their attitude towards English lesson. The research was carried out in 2009 – 2010 education-instruction year in Karatli Sehit Sahin Yilmaz Elementary School, Nigde, Turkey. Totally 50 students in two different classes in the 5th grade of this school participated in the study. The results of the research showed a significant difference between the attitude scores of the experiment group and the control group. It was also found out that the multiple intelligences approach activities were more effective in thepositive development of the students’ attitudes. At the end of the research, it is revealed that the students who are educated by multiple intelligences supported project-based learning method are more successful and have a higher motivation level than the studentswho are educated by the traditional instructional methods.

  10. Learning from Lessons: Studying the Structure and Construction of Mathematics Teacher Knowledge in Australia, China and Germany

    Science.gov (United States)

    Chan, Man Ching Esther; Clarke, David J.; Clarke, Doug M.; Roche, Anne; Cao, Yiming; Peter-Koop, Andrea

    2018-01-01

    The major premise of this project is that teachers learn from the act of teaching a lesson. Rather than asking "What must a teacher already know in order to practice effectively?", this project asks "What might a teacher learn through their activities in the classroom and how might this learning be optimised?" In this project,…

  11. Project management lessons learned from building the Wendelstein 7-x stellerator fusion research reactor

    Energy Technology Data Exchange (ETDEWEB)

    Freire-Gormaly, M.; Gittens, A.; Zhang, L., E-mail: m.freire.gormaly@utoronto.ca, E-mail: antonio.gittens@mail.utoronto.ca, E-mail: lavender.zhang@outlook.com [University of Toronto, Toronto, ON (Canada)

    2015-07-01

    Wendelstein 7-X (W7-X) is the world's largest 'stellerator' nuclear fusion reactor being commissioned in Greifswald, Germany. It will inform the international fusion energy test device (ITER). The complexity of W7- X added challenges since industrial expertise to manufacture components did not exist. The construction was completed eight years behind schedule and almost 100% over budget. Key take-away lessons in project management were revealed from W7-X which can be applied to any nuclear project. These lessons are aligned with the project management knowledge areas of schedule, stakeholder, procurement, scope, schedule, cost, communication, risk, quality, human resources and procurement management. (author)

  12. Project management lessons learned from building the Wendelstein 7-x stellerator fusion research reactor

    International Nuclear Information System (INIS)

    Freire-Gormaly, M.; Gittens, A.; Zhang, L.

    2015-01-01

    Wendelstein 7-X (W7-X) is the world's largest 'stellerator' nuclear fusion reactor being commissioned in Greifswald, Germany. It will inform the international fusion energy test device (ITER). The complexity of W7- X added challenges since industrial expertise to manufacture components did not exist. The construction was completed eight years behind schedule and almost 100% over budget. Key take-away lessons in project management were revealed from W7-X which can be applied to any nuclear project. These lessons are aligned with the project management knowledge areas of schedule, stakeholder, procurement, scope, schedule, cost, communication, risk, quality, human resources and procurement management. (author)

  13. Promoting system-level learning from project-level lessons

    Energy Technology Data Exchange (ETDEWEB)

    Jong, Amos A. de, E-mail: amosdejong@gmail.com [Innovation Management, Utrecht (Netherlands); Runhaar, Hens A.C., E-mail: h.a.c.runhaar@uu.nl [Section of Environmental Governance, Utrecht University, Utrecht (Netherlands); Runhaar, Piety R., E-mail: piety.runhaar@wur.nl [Organisational Psychology and Human Resource Development, University of Twente, Enschede (Netherlands); Kolhoff, Arend J., E-mail: Akolhoff@eia.nl [The Netherlands Commission for Environmental Assessment, Utrecht (Netherlands); Driessen, Peter P.J., E-mail: p.driessen@geo.uu.nl [Department of Innovation and Environment Sciences, Utrecht University, Utrecht (Netherlands)

    2012-02-15

    A growing number of low and middle income nations (LMCs) have adopted some sort of system for environmental impact assessment (EIA). However, generally many of these EIA systems are characterised by a low performance in terms of timely information dissemination, monitoring and enforcement after licencing. Donor actors (such as the World Bank) have attempted to contribute to a higher performance of EIA systems in LMCs by intervening at two levels: the project level (e.g. by providing scoping advice or EIS quality review) and the system level (e.g. by advising on EIA legislation or by capacity building). The aims of these interventions are environmental protection in concrete cases and enforcing the institutionalisation of environmental protection, respectively. Learning by actors involved is an important condition for realising these aims. A relatively underexplored form of learning concerns learning at EIA system-level via project level donor interventions. This 'indirect' learning potentially results in system changes that better fit the specific context(s) and hence contribute to higher performances. Our exploratory research in Ghana and the Maldives shows that thus far, 'indirect' learning only occurs incidentally and that donors play a modest role in promoting it. Barriers to indirect learning are related to the institutional context rather than to individual characteristics. Moreover, 'indirect' learning seems to flourish best in large projects where donors achieved a position of influence that they can use to evoke reflection upon system malfunctions. In order to enhance learning at all levels donors should thereby present the outcomes of the intervention elaborately (i.e. discuss the outcomes with a large audience), include practical suggestions about post-EIS activities such as monitoring procedures and enforcement options and stimulate the use of their advisory reports to generate organisational memory and ensure a better

  14. Promoting system-level learning from project-level lessons

    International Nuclear Information System (INIS)

    Jong, Amos A. de; Runhaar, Hens A.C.; Runhaar, Piety R.; Kolhoff, Arend J.; Driessen, Peter P.J.

    2012-01-01

    A growing number of low and middle income nations (LMCs) have adopted some sort of system for environmental impact assessment (EIA). However, generally many of these EIA systems are characterised by a low performance in terms of timely information dissemination, monitoring and enforcement after licencing. Donor actors (such as the World Bank) have attempted to contribute to a higher performance of EIA systems in LMCs by intervening at two levels: the project level (e.g. by providing scoping advice or EIS quality review) and the system level (e.g. by advising on EIA legislation or by capacity building). The aims of these interventions are environmental protection in concrete cases and enforcing the institutionalisation of environmental protection, respectively. Learning by actors involved is an important condition for realising these aims. A relatively underexplored form of learning concerns learning at EIA system-level via project level donor interventions. This ‘indirect’ learning potentially results in system changes that better fit the specific context(s) and hence contribute to higher performances. Our exploratory research in Ghana and the Maldives shows that thus far, ‘indirect’ learning only occurs incidentally and that donors play a modest role in promoting it. Barriers to indirect learning are related to the institutional context rather than to individual characteristics. Moreover, ‘indirect’ learning seems to flourish best in large projects where donors achieved a position of influence that they can use to evoke reflection upon system malfunctions. In order to enhance learning at all levels donors should thereby present the outcomes of the intervention elaborately (i.e. discuss the outcomes with a large audience), include practical suggestions about post-EIS activities such as monitoring procedures and enforcement options and stimulate the use of their advisory reports to generate organisational memory and ensure a better information

  15. Human Spaceflight Conjunction Assessment: Lessons Learned

    Science.gov (United States)

    Smith, Jason T.

    2011-01-01

    This viewgraph presentation reviews the process of a human space flight conjunction assessment and lessons learned from the more than twelve years of International Space Station (ISS) operations. Also, the application of these lessons learned to a recent ISS conjunction assessment with object 84180 on July 16, 2009 is also presented.

  16. Transition and Closeout of the Former DOE Mound Plant Site: Lessons Learned

    International Nuclear Information System (INIS)

    Carpenter, C. P.; Marks, M. L.; Smiley, S.L.; Gallaher, D. M.

    2006-01-01

    The U.S. Department of Energy's (DOE's) Office of Environmental Management (EM) manages the Miamisburg Closure Project (MCP) by cleaning up the Mound site, located in Miamisburg, Ohio, to specific environmental standards, conveying all excess land parcels to the Miamisburg Mound Community Improvement Corporation, and transferring all continuing DOE post-closure responsibilities to the Office of Legacy Management (LM). Presently, the EM cleanup contract of the Mound site with CH2M Hill Mound Inc. is scheduled for completion on March 31, 2006. LM manages the Mound transition efforts and also post-closure responsibilities at other DOE sites via a contract with the S.M. Stoller Corporation. The programmatic transfer from EM to LM is scheduled to take place on October 1, 2006. The transition of the Mound site has required substantial integration and coordination between the EM and LM. Several project management principles have been implemented to help facilitate the transfer of programmatic responsibility. As a result, several lessons learned have been identified to help streamline and improve integration and coordination of the transfer process. Lessons learned from the Mound site transition project are considered a work in progress and have been summarized according to a work breakdown structure for specific functional areas in the transition schedule. The functional areas include program management, environmental, records management, information technology, property management, stakeholder and regulatory relations, procurement, worker pension and benefits, and project closeout. Specific improvements or best practices have been recognized and documented by the Mound transition team. The Mound site is one of three major cleanup sites within the EM organization scheduled for completion in 2006. EM, EM cleanup contractor, LM, and LM post-closure contractor have identified lessons learned during the transition and closure of the Mound site. The transition effort from

  17. IVHS Institutional Issues and Case Studies, Analysis and Lessons Learned, Final Report

    Science.gov (United States)

    1994-04-01

    This 'Analysis and Lessons Learned' report contains observations, conclusions, and recommendations based on the performance of six case studies of Intelligent Vehicle-Highway Systems (IVHS) projects. Information to support the development of the case...

  18. Translating 10 lessons from lean six sigma project in paper-based training site to electronic health record-based primary care practice: challenges and opportunities.

    Science.gov (United States)

    Aleem, Sohaib

    2013-01-01

    Lean Six Sigma is a well-proven methodology to enhance the performance of any business, including health care. The strategy focuses on cutting out waste and variation from the processes to improve the value and efficiency of work. This article walks through the journey of "green belt" training using a Lean Six Sigma approach and the implementation of a process improvement project that focused on wait time for patients to be examined in an urban academic primary care clinic without requiring added resources. Experiences of the training and the project at an urban paper-based satellite clinic have informed the planning efforts of a data and performance team, including implementing a 15-minute nurse "pre-visit" at primary care sites of an accountable care organization.

  19. Network model of project "Lean Production"

    Science.gov (United States)

    Khisamova, E. D.

    2018-05-01

    Economical production implies primarily new approaches to culture of management and organization of production and offers a set of tools and techniques that allows reducing losses significantly and making the process cheaper and faster. Economical production tools are simple solutions that allow one to see opportunities for improvement of all aspects of the business, to reduce losses significantly, to constantly improve the whole spectrum of business processes, to increase significantly the transparency and manageability of the organization, to take advantage of the potential of each employee of the company, to increase competitiveness, and to obtain significant economic benefits without making large financial expenditures. Each of economical production tools solves a specific part of the problems, and only application of their combination will allow one to solve the problem or minimize it to acceptable values. The research of the governance process project "Lean Production" permitted studying the methods and tools of lean production and developing measures for their improvement.

  20. Improving the Identification, Dissemination and Implementation of Deactivation and Decommissioning Lessons Learned and Best Practices

    International Nuclear Information System (INIS)

    Waisley, Sandra L.; Lackey, Michael B.; Dusek, Lansing G.

    2008-01-01

    Approximately $150 billion of work currently remains in the United States Department of Energy's (DoE's) Office of Environmental Management (EM) life cycle budget for U.S. projects. Contractors who manage facilities for the DOE have been challenged to identify transformational changes to reduce the life cycle costs and to develop a knowledge-management system that identifies, disseminates, and tracks the implementation of lessons learned and best practices. This paper discusses DoE's rationale for using lessons learned and best practices to improve safety and performance while reducing life cycle costs for Deactivation and Decommissioning (D and D) projects. It also provides an update on the Energy Facility Contractors Group's (EFCOG's) progress in supporting DoE's efforts. At this juncture the best practice efforts described are in developmental stages; however, the commitment to and the concrete nature of the work thus far is noteworthy in regard to improving the way D and D lessons learned and best practices are identified, disseminated and implemented across the DOE Complex

  1. Influences of Multimedia Lesson Contents On Effective Learning

    Directory of Open Access Journals (Sweden)

    Tuncay Yavuz Ozdemir

    2013-11-01

    Full Text Available In the information era that we experience today, there is a rapid change in the methods, techniques and materials used for education and teaching. The usage of information and communication technology-assisted teaching materials are becoming more commonplace. Parallel to these developments, the Ministry of National Education took steps to develop IT substructures of all schools in the country and implemented many projects. The purpose of this study is to determine whether or not the multimedia lesson content used by teachers affect effective learning. This study is a qualitative study, conducted with 45 teachers working in primary schools during the 2011-2012 academic year. According to the study findings, participants believe that using multimedia lesson content during lectures increases student motivation, makes students more curious and interested, and think that using multimedia lesson content has positive effects.

  2. Lessons learned from accidents investigations

    Energy Technology Data Exchange (ETDEWEB)

    Zuniga-Bello, P. [Consejo Nacional de Ciencia y Tecnologia (CONACYT), Mexico City (Mexico); Croft, J. [National Radiological Protection Board (United Kingdom); Glenn, J

    1997-12-31

    Accidents from three main practices: medical applications, industrial radiography and industrial irradiators are used to illustrate some common causes of accidents and the main lessons to be learned. A brief description of some of these accidents is given. Lessons learned from the described accidents are approached by subjects covering: safety culture, quality assurance, human factors, good engineering practice, defence in depth, security of sources, safety assessment and monitoring and verification compliance. (author)

  3. Lessons learned from accident investigations

    International Nuclear Information System (INIS)

    Zuniga-Bello, P.; Croft, J.R.; Glenn, J.

    1998-01-01

    Accidents in three main practices - medical applications, industrial radiography and industrial irradiators - are used to illustrate some common causes of accidents and the main lessons to be learned from them. A brief description of some of these accidents is given. Lessons learned from the accidents described are approached bearing in mind: safety culture, quality assurance, human factors, good engineering practice, defence in depth, security of sources, safety assessment and monitoring and verification compliance. (author)

  4. Providing Simulated Online and Mobile Learning Experiences in a Prison Education Setting: Lessons Learned from the PLEIADES Pilot Project

    Science.gov (United States)

    Farley, Helen; Murphy, Angela; Bedford, Tasman

    2014-01-01

    This article reports on the preliminary findings, design criteria and lessons learned while developing and piloting an alternative to traditional print-based education delivery within a prison environment. PLEIADES (Portable Learning Environments for Incarcerated Distance Education Students), was designed to provide incarcerated students with…

  5. Considerations for implementing an organizational lessons learned process.

    Energy Technology Data Exchange (ETDEWEB)

    Fosshage, Erik D

    2013-05-01

    This report examines the lessons learned process by a review of the literature in a variety of disciplines, and is intended as a guidepost for organizations that are considering the implementation of their own closed-loop learning process. Lessons learned definitions are provided within the broader context of knowledge management and the framework of a learning organization. Shortcomings of existing practices are summarized in an attempt to identify common pitfalls that can be avoided by organizations with fledgling experiences of their own. Lessons learned are then examined through a dual construct of both process and mechanism, with emphasis on integrating into organizational processes and promoting lesson reuse through data attributes that contribute toward changed behaviors. The report concludes with recommended steps for follow-on efforts.

  6. The Role of a Commander in Military Lessons Learned Systems

    Directory of Open Access Journals (Sweden)

    Zenon Waliński

    2015-06-01

    Full Text Available The aim of the paper is to investigate the role of a commander in military Lessons Learned systems. In order to achieve the aim, the paper presents (1 the architecture of the Lessons Learned capabilities in the U.S. Army, NATO and the Polish Armed Forces, (2 the commander’s role in the Lessons Learned process (3 the commander’s role in fostering Lessons Learned organisation culture. The paper is based on multiple case study analysis including Lessons Learned systems in NATO, the U.S. Army and the Polish Armed Forces.

  7. Best practices for effective partnerships with Aboriginal groups : lessons learned from major Canadian projects in mining and forestry

    Energy Technology Data Exchange (ETDEWEB)

    Andersen, C. [Labrador Inuit Association, NF (Canada)

    2004-07-01

    This PowerPoint presentation provided an update on effective partnerships and best practices reported in Canadian mining, forestry and energy projects. The forestry and mining industries have provided most of the models and best practices for natural resource projects. This presentation described the approach to negotiations for the Voisey's Bay Nickel Project and future steps for commercial success. The lessons learned were also discussed with particular reference to corporate agendas that help advance Aboriginal participation. The presentation outlined the expected results from Voisey's Bay Nickel Company Impact Benefit Agreement with the Labrador Inuit Association and the Innu Nation. The issue of responsible environmental management was also discussed along with long-term opportunities for jobs, education and business opportunities for Newfoundland and Labrador residents. figs.

  8. PUREX/UO{sub 3} facilities deactivation lessons learned: History

    Energy Technology Data Exchange (ETDEWEB)

    Gerber, M.S.

    1997-11-25

    In May 1997, a historic deactivation project at the PUREX (Plutonium URanium EXtraction) facility at the Hanford Site in south-central Washington State concluded its activities (Figure ES-1). The project work was finished at $78 million under its original budget of $222.5 million, and 16 months ahead of schedule. Closely watched throughout the US Department of Energy (DOE) complex and by the US Department of Defense for the value of its lessons learned, the PUREX Deactivation Project has become the national model for the safe transition of contaminated facilities to shut down status.

  9. Pollution prevention program for new projects -- Lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Lum, J. [Dept. of Energy, Washington, DC (United States)

    1993-03-01

    The purpose of this presentation is to relay the experience of the Office of New Production Reactors (NP) in developing and implementing its pollution prevention program. NP was established to plan, design, and construct a new safe and environmentally acceptable nuclear reactor capacity necessary to provide an assured supply of tritium to maintain the nation`s long-term deterrent capability. The Program offered the Department of Energy an opportunity to demonstrate its commitment to environmental protection via minimization of environmental releases; new design offers the best opportunity for pollution prevention. The NP pollution prevention program was never fully implemented because NP`s tritium production design activity was recovery terminated. The information in this paper represented lessons learned from the last three years of NP operation.

  10. Progress and Lessons Learned in Transuranic Waste Disposition at The Department of Energy's Advanced Mixed Waste Treatment Project

    Energy Technology Data Exchange (ETDEWEB)

    J.D. Mousseau; S.C. Raish; F.M. Russo

    2006-05-18

    This paper provides an overview of the Department of Energy's (DOE) Advanced Mixed Waste Treatment Project (AMWTP) located at the Idaho National Laboratory (INL) and operated by Bechtel BWXT Idaho, LLC(BBWI) It describes the results to date in meeting the 6,000-cubic-meter Idaho Settlement Agreement milestone that was due December 31, 2005. The paper further describes lessons that have been learned from the project in the area of transuranic (TRU) waste processing and waste certification. Information contained within this paper would be beneficial to others who manage TRU waste for disposal at the Waste Isolation Pilot Plant (WIPP).

  11. Does Lean Production Sacrifice Learning in a Manufacturing Environment? An Action Learning Case Study.

    Science.gov (United States)

    Scott, Fiona M.; Butler, Jim; Edwards, John

    2001-01-01

    An action learning program was implemented by a manufacturer using lean production practices. Action learning practices were accommodated during times of stability, but abandoned in times of crisis. The meaning of work in this organizational culture excluded all practices, such as reflection, that were not visible and targeted at immediate…

  12. Steam generator replacement at Bruce A: approach, results, and lessons learned

    International Nuclear Information System (INIS)

    Tomkiewicz, W.; Savage, B.; Smith, J.

    2008-01-01

    Steam Generator Replacement is now complete in Bruce A Units 1 and 2. In each reactor, eight steam generators were replaced; these were the first CANDU steam generator replacements performed anywhere in the world. The plans for replacement were developed in 2004 and 2005, and were summarized in an earlier paper for the CNS Conference held in November, 2006. The present paper briefly summarizes the methodologies and special processes used such as metrology, cutting and welding and heavy lifting. The paper provides an update since the earlier report and focuses on the project achievements to date, such as: - A combination of engineered methodology, laser metrology and precise remote machining led to accurate first time fit-ups of each new replacement steam generator and steam drums - Lessons learned in the first unit led to schedule improvements in the second unit - Dose received was lowest recorded for any steam generator replacement project. The experience gained and lessons learned from Units 1 and 2 will be valuable in planning and executing future replacement steam generator projects. A video was presented

  13. Feedback of safety - related operational experience: Lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Elias, D [Commonwealth Edison Co. (United States)

    1997-09-01

    The presentation considers the following aspects of feedback of safety-related operational experience: lessons learned program, objectives, personnel characteristics; three types of documents for transmitting lessons learned issues.

  14. Feedback of safety - related operational experience: Lessons learned

    International Nuclear Information System (INIS)

    Elias, D.

    1997-01-01

    The presentation considers the following aspects of feedback of safety-related operational experience: lessons learned program, objectives, personnel characteristics; three types of documents for transmitting lessons learned issues

  15. Good Practice Lessons from the Urban Traffic Project, Denmark

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    2002-01-01

    In 1990, as the first government in the world, the Danish Cabinet approved a national action plan for sustainable transport. In 1992, as part of the implementation of this plan, the Urban Traffic Project was set up with the EPA. The policy situation was one of a state agency trying to motivate...... urban municipalities to work with T&E (transport and environment) integration, i.e. integration of concerns for safety, energy, air quality, noise etc. in urban traffic planning. 50 major urban municipalities participated in the project. The most important lessons to be learned from the project are: (1......) With a fairly modest investment (DKK 150 million in seed money) it has been possible on a voluntary basis to motivate the majority of urban municipalities to work with T&E integration. (2) The top motivating factor for municipalities to participate was a desire for organisational and professional learning. (3...

  16. Lessons learned about ageing and gerontological nursing in South Africa

    Directory of Open Access Journals (Sweden)

    Staja Q. Booker

    2015-07-01

    Full Text Available Background: The unprecedented global growth in older adults merits high-quality gerontological nursing care. As gerontological nursing grows in visibility in developed and developing countries, nurses must possess a broader worldview of ageing with knowledge of physiological, psychosocial, and cultural issues. Purpose: The purpose of this article is to: (1 highlight lessons learned on differences and similarities in ageing and care of older adults in the United States of America (USA and South Africa (SA; and (2 provide recommendations on how to advance gerontological nursingeducation in SA. Methods: A two-week international service-learning project was undertaken by visiting SA and learning about their nursing system and care of older adults. Service-learning is an innovative teaching-learning-service method that provided reflective and hands-on experience of gerontological nursing. This article provides a personal reflection of lessons learned about ageing and gerontological nursing during the service-learning project. Findings: Care of older adults in SA is in many ways different from and similar to that in the USA. Consequently global nurses should recognise those differences and provide culturally appropriate care. This service-learning experience also demonstrated the need for gerontological nursing education in SA. Based on this, recommendations on how to infuse and advance gerontological nursing education in SA are provided. Conclusion: Caring for older adults in a global context requires knowledge and understanding of cultures and their values and practices. With a growing population of diverse older adults, there is a need for incorporation

  17. Pioneering a Nursing Home Quality Improvement Learning Collaborative: A Case Study of Method and Lessons Learned.

    Science.gov (United States)

    Gillespie, Suzanne M; Olsan, Tobie; Liebel, Dianne; Cai, Xueya; Stewart, Reginald; Katz, Paul R; Karuza, Jurgis

    2016-02-01

    To describe the development of a nursing home (NH) quality improvement learning collaborative (QILC) that provides Lean Six Sigma (LSS) training and infrastructure support for quality assurance performance improvement change efforts. Case report. Twenty-seven NHs located in the Greater Rochester, NY area. The learning collaborative approach in which interprofessional teams from different NHs work together to improve common clinical and organizational processes by sharing experiences and evidence-based practices to achieve measurable changes in resident outcomes and system efficiencies. NH participation, curriculum design, LSS projects. Over 6 years, 27 NHs from urban and rural settings joined the QILC as organizational members and sponsored 47 interprofessional teams to learn LSS techniques and tools, and to implement quality improvement projects. NHs, in both urban and rural settings, can benefit from participation in QILCs and are able to learn and apply LSS tools in their team-based quality improvement efforts. Published by Elsevier Inc.

  18. Driver. D530.2 – Tools for the Lessons Learned Framework

    NARCIS (Netherlands)

    Schaik, M.G. van; et al

    2016-01-01

    In this deliverable D530.2 “Tools for the Lessons Learned Framework” the overall lessons learned framework will be clarified based on the delivery D53.1 “Lessons Learned Framework Concept” and aligned with the deliverable D52.1 “Harmonized competence framework”. The Tools for the Lessons Learned

  19. Spent Fuel Storage Operation - Lessons Learned

    International Nuclear Information System (INIS)

    2013-12-01

    Experience gained in planning, constructing, licensing, operating, managing and modifying spent fuel storage facilities in some Member States now exceeds 50 years. Continual improvement is only achieved through post-project review and ongoing evaluation of operations and processes. This publication is aimed at collating and sharing lessons learned. Hopefully, the information provided will assist Member States that already have a developed storage capability and also those considering development of a spent nuclear fuel storage capability in making informed decisions when managing their spent nuclear fuel. This publication is expected to complement the ongoing Coordinated Research Project on Spent Fuel Performance Assessment and Research (SPAR-III); the scope of which prioritizes facility operational practices in lieu of fuel and structural components behaviour over extended durations. The origins of the current publication stem from a consultants meeting held on 10-12 December 2007 in Vienna, with three participants from the IAEA, Slovenia and USA, where an initial questionnaire on spent fuel storage was formulated (Annex I). The resultant questionnaire was circulated to participants of a technical meeting, Spent Fuel Storage Operations - Lessons Learned. The technical meeting was held in Vienna on 13-16 October 2008, and sixteen participants from ten countries attended. A consultants meeting took place on 18-20 May 2009 in Vienna, with five participants from the IAEA, Slovenia, UK and USA. The participants reviewed the completed questionnaires and produced an initial draft of this publication. A third consultants meeting took place on 9-11 March 2010, which six participants from Canada, Hungary, IAEA, Slovenia and the USA attended. The meeting formulated a second questionnaire (Annex II) as a mechanism for gaining further input for this publication. A final consultants meeting was arranged on 20-22 June 2011 in Vienna. Six participants from Hungary, IAEA, Japan

  20. Towards a lessons learned system for critical software

    International Nuclear Information System (INIS)

    Andrade, J.; Ares, J.; Garcia, R.; Pazos, J.; Rodriguez, S.; Rodriguez-Paton, A.; Silva, A.

    2007-01-01

    Failure can be a major driver for the advance of any engineering discipline and Software Engineering is no exception. But failures are useful only if lessons are learned from them. In this article we aim to make a strong defence of, and set the requirements for, lessons learned systems for safety-critical software. We also present a prototype lessons learned system that includes many of the features discussed here. We emphasize that, apart from individual organizations, lessons learned systems should target industrial sectors and even the Software Engineering community. We would like to encourage the Software Engineering community to use this kind of systems as another tool in the toolbox, which complements or enhances other approaches like, for example, standards and checklists

  1. Towards a lessons learned system for critical software

    Energy Technology Data Exchange (ETDEWEB)

    Andrade, J. [University of A Coruna. Campus de Elvina, s/n. 15071, A Coruna (Spain)]. E-mail: jag@udc.es; Ares, J. [University of A Coruna. Campus de Elvina, s/n. 15071, A Coruna (Spain)]. E-mail: juanar@udc.es; Garcia, R. [University of A Coruna. Campus de Elvina, s/n. 15071, A Coruna (Spain)]. E-mail: rafael@udc.es; Pazos, J. [Technical University of Madrid. Campus de Montegancedo, s/n. 28660, Boadilla del Monte, Madrid (Spain)]. E-mail: jpazos@fi.upm.es; Rodriguez, S. [University of A Coruna. Campus de Elvina, s/n. 15071, A Coruna (Spain)]. E-mail: santi@udc.es; Rodriguez-Paton, A. [Technical University of Madrid. Campus de Montegancedo, s/n. 28660, Boadilla del Monte, Madrid (Spain)]. E-mail: arpaton@fi.upm.es; Silva, A. [Technical University of Madrid. Campus de Montegancedo, s/n. 28660, Boadilla del Monte, Madrid (Spain)]. E-mail: asilva@fi.upm.es

    2007-07-15

    Failure can be a major driver for the advance of any engineering discipline and Software Engineering is no exception. But failures are useful only if lessons are learned from them. In this article we aim to make a strong defence of, and set the requirements for, lessons learned systems for safety-critical software. We also present a prototype lessons learned system that includes many of the features discussed here. We emphasize that, apart from individual organizations, lessons learned systems should target industrial sectors and even the Software Engineering community. We would like to encourage the Software Engineering community to use this kind of systems as another tool in the toolbox, which complements or enhances other approaches like, for example, standards and checklists.

  2. Lessons Learned from the USAID Girls' Education Activity in Guatemala, Morocco, and Peru.

    Science.gov (United States)

    Rugh, Andrea; Brush, Lorelei

    The Girls' Education Activity (GEA) is a project of the United States Agency for International Development's (USAID's) Office of Women in Development (WID) in the Bureau for Economic Growth, Agriculture and Trade. This report summarizes the experiences and lessons learned from 12 project initiatives in the 3 participating countries (Guatemala,…

  3. Teaching Project Management On-Line: Lessons Learned from MOOCs

    Science.gov (United States)

    Falcao, Rita; Fernandes, Luis

    2016-01-01

    Creating a course for teaching project management online in a full online distance-learning environment was a challenge. Working with adult learners from different continents that want to complete a Master degree was an additional challenge. This paper describes how different MOOCs were used to learn about teaching -(meta) e-learning. MOOCs…

  4. Teaching and learning in the international classroom: quality principles and lessons learned from the IntlUni project

    DEFF Research Database (Denmark)

    Lauridsen, Karen M.; Cozart, Stacey Marie

    2015-01-01

    , and expectations about the teaching and learning processes and outcomes. Certainly, many teachers in these settings are meeting the challenges of this diversity, and some are leveraging it to improve student learning and intercultural competence. Nevertheless, the work of IntlUni, an Erasmus Academic Network (2012......As higher education in Europe becomes increasingly internationalized, many higher education institutions are facing new diversity issues as well as opportunities arising from educational settings where students and teachers often have different first languages, cultural backgrounds...... of principles for quality teaching and learning in the international classroom, developed by the network, as well as a number of the important lessons learned...

  5. Ares Launch Vehicles Lean Practices Case Study

    Science.gov (United States)

    Doreswamy, Rajiv; Self, Timothy A.

    2007-01-01

    The Ares launch vehicles team, managed by the Ares Projects Office (APO) at NASA Marshall Space Flight Center, has completed the Ares I Crew Launch Vehicle System Requirements Review and System Definition Review and early design work for the Ares V Cargo Launch Vehicle. This paper provides examples of how Lean Manufacturing, Kaizen events, and Six Sigma practices are helping APO deliver a new space transportation capability on time and within budget, while still meeting stringent technical requirements. For example, Lean philosophies have been applied to numerous process definition efforts and existing process improvement activities, including the Ares I-X test flight Certificate of Flight Readiness (CoFR) process, risk management process, and review board organization and processes. Ares executives learned Lean practices firsthand, making the team "smart buyers" during proposal reviews and instilling the team with a sense of what is meant by "value-added" activities. Since the goal of the APO is to field launch vehicles at a reasonable cost and on an ambitious schedule, adopting Lean philosophies and practices will be crucial to the Ares Project's long-term SUCCESS.

  6. Lessons learned from the PMI case study: the community perspective.

    Science.gov (United States)

    Hare, M L; Orians, C E; Kennedy, M G; Goodman, K J; Wijesinha, S; Seals, B F

    2000-03-01

    This summary report presents the lessons learned during the two-part qualitative case study on the efficacy of the Prevention Marketing Initiative (PMI) in its implementation of an HIV prevention program. About 179 community participants were included in the PMI program, which discussed topics ranging from organizing initial planning committees to financially sustaining federal demonstration programs. One of the successes observed was the development of rapport with schools and churches; however, during the course of its implementation, the program realized the necessity of 1) approaching the program as an ongoing process; 2) going beyond studying the target population through formative research; 3) changing the role of a community coalition as the project matures; 4) reexamining the composition of coalition in the light of the target audience; 5) advocating the project as a community resource that promotes collaboration; 6) attending the needs of coalition members; and 7) using the media in the campaign. Likewise, several lessons were also learned in the areas of youth involvement, intervention development, program implementation, and maintenance of PMI activities.

  7. TANK 241-AN-102 MULTI-PROBE CORROSION MONITORING SYSTEM PROJECT LESSONS LEARNED

    International Nuclear Information System (INIS)

    TAYLOR T; HAGENSEN A; KIRCH NW

    2008-01-01

    During 2007 and 2008, a new Multi-Probe Corrosion Monitoring System (MPCMS) was designed and fabricated for use in double-shell tank 241-AN-102. The system was successfully installed in the tank on May 1, 2008. The 241-AN-102 MPCMS consists of one 'fixed' in-tank probe containing primary and secondary reference electrodes, tank material electrodes, Electrical Resistance (ER) sensors, and stressed and unstressed corrosion coupons. In addition to the fixed probe, the 241-AN-102 MPCMS also contains four standalone coupon racks, or 'removable' probes. Each rack contains stressed and unstressed coupons made of American Society of Testing and Materials A537 CL1 steel, heat-treated to closely match the chemical and mechanical characteristics of the 241-AN-102 tank wall. These coupon racks can be removed periodically to facilitate examination of the attached coupons for corrosion damage. Along the way to successful system deployment and operation, the system design, fabrication, and testing activities presented a number of challenges. This document discusses these challenges and lessons learned, which when applied to future efforts, should improve overall project efficiency

  8. From Toyota to the bedside: nurses can lead the lean way in health care reform.

    Science.gov (United States)

    Johnson, Joyce E; Smith, Amy L; Mastro, Kari A

    2012-01-01

    The advent of health care reform means new pressures on American hospitals, which will be forced to do more with less. In the next decade, increased use of "Lean" principles and practices in hospitals can create real value by reducing waste and improving productivity, costs, quality, and the timely delivery of patient care services. In 2010, the Institute of Medicine recommended that nurses lead collaborative quality improvement efforts and assume a major role in redesigning health care in the United States. In this article, we provide an overview of the use of Lean techniques in health care and 2 case studies of successful, nurse-directed Lean initiatives at the Robert Wood Johnson University Hospital. The article concludes with some lessons we have learned and implications for nursing education in the future that must include the concepts, tools, and skills required for adapting Lean to the patient care environment.

  9. Hydrogen Fuel Cell Analysis: Lessons Learned from Stationary Power Generation Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Scott E. Grasman; John W. Sheffield; Fatih Dogan; Sunggyu Lee; Umit O. Koylu; Angie Rolufs

    2010-04-30

    This study considered opportunities for hydrogen in stationary applications in order to make recommendations related to RD&D strategies that incorporate lessons learned and best practices from relevant national and international stationary power efforts, as well as cost and environmental modeling of pathways. The study analyzed the different strategies utilized in power generation systems and identified the different challenges and opportunities for producing and using hydrogen as an energy carrier. Specific objectives included both a synopsis/critical analysis of lessons learned from previous stationary power programs and recommendations for a strategy for hydrogen infrastructure deployment. This strategy incorporates all hydrogen pathways and a combination of distributed power generating stations, and provides an overview of stationary power markets, benefits of hydrogen-based stationary power systems, and competitive and technological challenges. The motivation for this project was to identify the lessons learned from prior stationary power programs, including the most significant obstacles, how these obstacles have been approached, outcomes of the programs, and how this information can be used by the Hydrogen, Fuel Cells & Infrastructure Technologies Program to meet program objectives primarily related to hydrogen pathway technologies (production, storage, and delivery) and implementation of fuel cell technologies for distributed stationary power. In addition, the lessons learned address environmental and safety concerns, including codes and standards, and education of key stakeholders.

  10. Cost Estimating for Decommissioning of a Plutonium Facility--Lessons Learned From The Rocky Flats Building 771 Project

    International Nuclear Information System (INIS)

    Stevens, J. L.; Titus, R.; Sanford, P. C.

    2002-01-01

    The Rocky Flats Closure Site is implementing an aggressive approach in an attempt to complete Site closure by 2006. The replanning effort to meet this goal required that the life-cycle decommissioning effort for the Site and for the major individual facilities be reexamined in detail. As part of the overall effort, the cost estimate for the Building 771 decommissioning project was revised to incorporate both actual cost data from a recently-completed similar project and detailed planning for all activities. This paper provides a brief overview of the replanning process and the original estimate, and then discusses the modifications to that estimate to reflect new data, methods, and planning rigor. It provides the new work breakdown structure and discusses the reasons for the final arrangement chosen. It follows with the process used to assign scope, cost, and schedule elements within the new structure, and development of the new code of accounts. Finally, it describes the project control methodology used to track the project, and provides lessons learned on cost tracking in the decommissioning environment

  11. LESSONS LEARNED IN OPERATING THE HOSE-IN-HOSE SYSTEM FOR TRANSFSERRING SLUDGE AT HANFORD'S K BASINS

    International Nuclear Information System (INIS)

    PERES MW

    2008-01-01

    In May 2007, the Department of Energy and the Fluor Hanford K Basin Closure Project completed transferring sludge from the K East Basin to new containers in the K West Basin using a Hose-in-Hose system. This project presented a number of complex and unique technical, operational, and management challenges that had to be resolved to complete the required transfers and satisfy project milestones. The project team (including DOE; regulators; and Fluor management, operations, maintenance, engineering and all other support organizations) found innovative solutions to each challenge. This paper records lessons learned during the operational phase of the sludge transfer via the Hose-In-Hose system. The subject is limited to the operational phase and does not cover design, development, testing or turnover. A discussion of the situation or problem encountered is provided, along with the lesson learned as applicable to a future program or project

  12. PENGEMBANGAN TUGAS AKHIR MELALUI PROJECT BASED LEARNING MODEL UNTUK MENINGKATKAN GENERIC GREEN SKILLS SISWA

    Directory of Open Access Journals (Sweden)

    Ana Ana

    2015-02-01

    Full Text Available ABSTRACT The development of students’ final project through Project-based Learning (PBLapproach was conducted in the workshop of family resource management (FRM in 7th semester.PBL approach is expected to give contribution to students’ motivation and experience to finish their final assignments of FRM workshop. The objectives of the research are to: (1 develop PBL model for the students’final project; (2 produce learning instruments of PBL such as lesson plans, manual of FRM workshop, and scientific report of FRM workshop. The method of the study was using research and development of Plomp model and quasi experiment for testing the effectiveness of the model. The research subjects were the students from the class of 2009 and 2010 who joined FRM workshop course. The study produced model, lesson plans, and manual of FRM workshop as the outputs. The result showed that project based learning model was effective to improve the students’ generic green skills for project management, collaborative skills, and communicative competence. Keywords: final project, generic green skill, family resource management, Project-Based Learning

  13. Establishing community partnerships to support late-life anxiety research: lessons learned from the Calmer Life project.

    Science.gov (United States)

    Jameson, John Paul; Shrestha, Srijana; Escamilla, Monica; Clark, Sharonda; Wilson, Nancy; Kunik, Mark; Zeno, Darrell; Harris, Toi B; Peters, Alice; Varner, Ivory L; Scantlebury, Carolyn; Scott-Gurnell, Kathy; Stanley, Melinda

    2012-01-01

    This article outlines the development of the Calmer Life project, a partnership established between researchers and faith-based and social service organizations to examine the effectiveness of cognitive behavioral therapy (CBT) incorporating religious/spiritual components for older African Americans in low-income communities. The program was designed to bypass several barriers to delivery of CBT within the specified community; it allows multimodal delivery (in person or by telephone) that occurs outside traditional mental health settings through faith-based organizations and neighborhood community centers. It includes religion/spirituality as an element, dependent upon the preference of the participant, and is modular, so that people can select the skills they wish to learn. Established relationships within the community were built upon, and initial meetings were held in community settings, allowing feedback from community organizations. This ongoing program is functioning successfully and has strengthened relationships with community partners and facilitated increased availability of education and services in the community. The lessons learned in establishing these partnerships are outlined. The growth of effectiveness research for late-life anxiety treatments in underserved minority populations requires development of functional partnerships between academic institutions and community stakeholders, along with treatment modifications to effectively address barriers faced by these consumers. The Calmer Life project may serve as a model.

  14. Lesson Learned About FPOs from a Customer`s Perspective

    Energy Technology Data Exchange (ETDEWEB)

    Gray, C.J.

    1998-12-31

    Conoco has undertaken three FPSO (Floating Production Storage and Off-loading) projects in the 1990s, Ukpokiti offshore Nigeria, and MacCulloch and Banff in the UK sector of the North Sea. They are different in the technical and commercial solutions they employed. This presentation describes the key features of each project from a commercial and technical perspective and summarizes the good practices and those aspects that could have been improved. The key commercial areas covered include project strategy, contractor selection and leasing issues. The technical areas include facility selection, reservoir characterization, and operations. Lessons learned about Safety Management are also identified. The information about each project is limited to key features only

  15. Exploring the Development of Competence in Lean Management through Action Learning Groups: A Study of the Introduction of Lean to a Facilities Management Function

    Science.gov (United States)

    Wyton, Paul; Payne, Robin

    2014-01-01

    The introduction of a Lean approach to management requires the development of understanding and capability. This in turn requires a structured training intervention and other supporting activities. This paper explores, through a case study, the way in which action learning groups (ALGs) supported the development of Lean capabilities in the…

  16. Operational Lessons Learned from the Ares I-X Flight Test

    Science.gov (United States)

    Davis, Stephan R.

    2010-01-01

    The Ares I-X flight test, launched in 2009, is the first test of the Ares I crew launch vehicle. This development flight test evaluated the flight dynamics, roll control, and separation events, but also provided early insights into logistical, stacking, launch, and recovery operations for Ares I. Operational lessons will be especially important for NASA as the agency makes the transition from the Space Shuttle to the Constellation Program, which is designed to be less labor-intensive. The mission team itself comprised only 700 individuals over the life of the project compared to the thousands involved in Shuttle and Apollo missions; while missions to and beyond low-Earth orbit obviously will require additional personnel, this lean approach will serve as a model for future Constellation missions. To prepare for Ares I-X, vehicle stacking and launch infrastructure had to be modified at Kennedy Space Center's Vehicle Assembly Building (VAB) as well as Launch Complex (LC) 39B. In the VAB, several platforms and other structures designed for the Shuttle s configuration had to be removed to accommodate the in-line, much taller Ares I-X. Vehicle preparation activities resulted in delays, but also in lessons learned for ground operations personnel, including hardware deliveries, cable routing, transferred work and custodial paperwork. Ares I-X also proved to be a resource challenge, as individuals and ground service equipment (GSE) supporting the mission also were required for Shuttle or Atlas V operations at LC 40/41 at Cape Canaveral Air Force Station. At LC 39B, several Shuttle-specific access arms were removed and others were added to accommodate the in-line Ares vehicle. Ground command, control, and communication (GC3) hardware was incorporated into the Mobile Launcher Platform (MLP). The lightning protection system at LC 39B was replaced by a trio of 600-foot-tall towers connected by a catenary wire to account for the much greater height of the vehicle. Like Shuttle

  17. Lessons learned from AU PSO-missions in Africa

    DEFF Research Database (Denmark)

    Mandrup, Thomas

    The paper deals with the lessons learned from AU's PSO since 2002, and what that entails for the design of future PSO.......The paper deals with the lessons learned from AU's PSO since 2002, and what that entails for the design of future PSO....

  18. Enhancing Lean Manufacturing Learning Experience through Hands-On Simulation

    Science.gov (United States)

    Elbadawi, Isam; McWilliams, Douglas L.; Tetteh, Edem G.

    2010-01-01

    Finding appropriate interactive exercises to increase students' learning in technical topic courses is always challenging to educators. In this study, several paper plane hands-on simulation exercises were developed, used, and tested in a lean manufacturing course for beginning college students. A pretest and posttest was used to assess the…

  19. Lean production tools and decision latitude enable conditions for innovative learning in organizations: a multilevel analysis.

    Science.gov (United States)

    Fagerlind Ståhl, Anna-Carin; Gustavsson, Maria; Karlsson, Nadine; Johansson, Gun; Ekberg, Kerstin

    2015-03-01

    The effect of lean production on conditions for learning is debated. This study aimed to investigate how tools inspired by lean production (standardization, resource reduction, visual monitoring, housekeeping, value flow analysis) were associated with an innovative learning climate and with collective dispersion of ideas in organizations, and whether decision latitude contributed to these associations. A questionnaire was sent out to employees in public, private, production and service organizations (n = 4442). Multilevel linear regression analyses were used. Use of lean tools and decision latitude were positively associated with an innovative learning climate and collective dispersion of ideas. A low degree of decision latitude was a modifier in the association to collective dispersion of ideas. Lean tools can enable shared understanding and collective spreading of ideas, needed for the development of work processes, especially when decision latitude is low. Value flow analysis played a pivotal role in the associations. Copyright © 2014 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  20. The Acadia Learning Project: Lessons Learned from Engaging High School Teachers and Students in Citizen Science Supporting National Parks

    Science.gov (United States)

    Nelson, S. J.; Zoellick, B.; Davis, Y.; Lindsey, E.

    2009-12-01

    In 2007 the authors initiated a citizen science research project, supported with funding from the Maine Department of Education, designed to extend research at Acadia National Park to a broader geographic area while also providing high school students and teachers with an opportunity to engage in authentic research in cooperation with working scientists. The scientific focus of the work has been on providing information about the mercury burden of organisms at different trophic levels across different geographic and environmental settings. The pedagogical focus has been on providing students with immersion in a substantial, field-based project, including background research, hypothesis formulation, data collection and analysis, and presentation of research findings. Starting work with 6 teachers in two schools the first year, the project expanded to involve more than 20 teachers and 350 students in a dozen schools in its second year. In coming years, with support from NOAA and cooperation from other National Parks in the region, the project will expand to include work in other states along the coast of the Gulf of Maine. In this paper the authors describe evolution in the use of the Internet over the first two years of the project, a sharpened focus on professional development for teachers, survey results regarding student views of the nature of science, the importance of focusing on rigorous, useful data collection from an educational perspective, success in establishing that samples collected by students are useful in research, the disjuncture between scientific and pedagogical outcomes, an assessment of the value of student poster presentations, and lessons learned about preparation and use of curriculum support materials. The authors also describe future directions, which include an increased focus on professional development and student work with graphs, a narrower focus in sample collection, and increased use of the Internet to provide participating teachers

  1. Low-Temperature Projects of the Department of Energy's Geothermal Technologies Program: Evaluation and Lessons Learned

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Tom; Snyder, Neil; Gosnold, Will

    2016-10-23

    This paper discusses opportunities and challenges related to the technical and economic feasibility of developing power generation from geothermal resources at temperatures of 150 degrees C and lower. Insights from projects funded by the U.S. Department of Energy (DOE), Geothermal Technologies Office inform these discussions and provide the basis for some lessons learned to help guide decisions by DOE and the industry in further developing this resource. The technical basis for low-temperature geothermal energy is well established and the systems can be economic today in certain situations. However, these applications are far from a 'plug and play' product; successful development today requires a good knowledge of geothermal system design and operation.

  2. Research Notes ~ Lessons from an International e-Learning Project

    Directory of Open Access Journals (Sweden)

    Paul Breen

    2007-11-01

    Full Text Available This paper offers a critical examination of an e-learning project in the context of a Distance Education training program delivered to teacher trainers by an external university in Rwanda. In examining the successes and failures of the project, it uses a framework based on ideas promulgated by Moore (1995 and strives to provide guidance and reference for future projects in this field.

  3. EPA Lean Government Initiative: How to Replicate Lean Successes

    Science.gov (United States)

    This Lean Replication Primer describes how EPA Offices and Regions can identify and adapt successful practices from previous Lean projects to “replicate” their successes and generate further improvements.

  4. Lessons learned from case studies of inhalation exposures of workers to radioactive aerosols

    Energy Technology Data Exchange (ETDEWEB)

    Hoover, M.D.; Fencl, A.F.; Newton, G.J. [and others

    1995-12-01

    Various Department of Energy requirements, rules, and orders mandate that lessons learned be identified, evaluated, shared, and incorporated into current practices. The recently issued, nonmandatory DOE standard for Development of DOE Lessons Learned Program states that a DOE-wide lessons learned program will {open_quotes}help to prevent recurrences of negative experiences, highlight best practices, and spotlight innovative ways to solve problems or perform work more safely, efficiently, and cost effectively.{close_quotes} Additional information about the lessons learned program is contained in the recently issued DOE handbook on Implementing U.S. Department of Energy Lessons Learned Programs and in October 1995 DOE SAfety Notice on Lessons Learned Programs. This report summarizes work in progress at ITRI to identify lessons learned for worker exposures to radioactive aerosols, and describes how this work will be incorporated into the DOE lessons learned program, including a new technical guide for measuring, modeling, and mitigating airborne radioactive particles. Follow-on work is focusing on preparation of {open_quotes}lessons learned{close_quotes} training materials for facility designers, managers, health protection professionals, line supervisors, and workers.

  5. Lessons learned in NEPA public involvement

    International Nuclear Information System (INIS)

    Stevens, A.D.; Glore, D.M.

    1995-01-01

    'In recent years Uncle Sam has been asking citizens for their help in improving the environment. The government is learning that with public input it can better prioritize environmental problems and more effectively direct limited funding.' The National Environmental Policy Act (NEPA), like many other government regulations, is a 'living law.' Although there are agency and Council guidelines, it is practical application, based on past practices and case law that refines the Act's broad concepts. The specifics of how to meet requirements are constantly being honed and melded to fit the unique situational needs of an agency, a project, or a public. This fluidity presents a challenge for stakeholder involvement activities. Communication practioners and project managers may have room for creativity and customized approaches, but they also find less than clear direction on what it takes to successfully avoid challenges of non-compliance. Because of the continuing uncertainty on how to involve the public meaningfully, it is vital to share important lessons learned from NEPA projects. The following practical suggestions are derived primarily from experiences with the Department of Energy's first ever complex-wide and site-specific environmental impact statement (EIS)-the Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs EIS (SNF ampersand INEL EIS)

  6. Safety and Mission Assurance for In-House Design Lessons Learned from Ares I Upper Stage

    Science.gov (United States)

    Anderson, Joel M.

    2011-01-01

    This viewgraph presentation identifies lessons learned in the course of the Ares I Upper Stage design and in-house development effort. The contents include: 1) Constellation Organization; 2) Upper Stage Organization; 3) Presentation Structure; 4) Lesson-Importance of Systems Engineering/Integration; 5) Lesson-Importance of Early S&MA Involvement; 6) Lesson-Importance of Appropriate Staffing Levels; 7) Lesson-Importance S&MA Team Deployment; 8) Lesson-Understanding of S&MA In-Line Engineering versus Assurance; 9) Lesson-Importance of Close Coordination between Supportability and Reliability/Maintainability; 10) Lesson-Importance of Engineering Data Systems; 11) Lesson-Importance of Early Development of Supporting Databases; 12) Lesson-Importance of Coordination with Safety Assessment/Review Panels; 13) Lesson-Implementation of Software Reliability; 14) Lesson-Implementation of S&MA Technical Authority/Chief S&MA Officer; 15) Lesson-Importance of S&MA Evaluation of Project Risks; 16) Lesson-Implementation of Critical Items List and Government Mandatory Inspections; 17) Lesson-Implementation of Critical Items List Mandatory Inspections; 18) Lesson-Implementation of Test Article Safety Analysis; and 19) Lesson-Importance of Procurement Quality.

  7. Noncombatant Evacuation Operations: Department of State’s Lessons Learned Program

    Science.gov (United States)

    2016-06-10

    means for utilizing the lessons learned, in some form of rehearsal or exercise, will 4 make the lessons learned meaningful. A lesson should only...required by DOS policy. The Department agreed with the recommendations to establish certain procedures to address the need to constantly 44 update...doctrine.31 Futch also explained that CALL is constantly seeking to expand training and educational efforts about the lessons learned process and

  8. Lessons learned from case studies of inhalation exposures of workers to radioactive aerosols

    International Nuclear Information System (INIS)

    Hoover, M.D.; Fencl, A.F.; Newton, G.J.

    1995-01-01

    Various Department of Energy requirements, rules, and orders mandate that lessons learned be identified, evaluated, shared, and incorporated into current practices. The recently issued, nonmandatory DOE standard for Development of DOE Lessons Learned Program states that a DOE-wide lessons learned program will open-quotes help to prevent recurrences of negative experiences, highlight best practices, and spotlight innovative ways to solve problems or perform work more safely, efficiently, and cost effectively.close quotes Additional information about the lessons learned program is contained in the recently issued DOE handbook on Implementing U.S. Department of Energy Lessons Learned Programs and in October 1995 DOE SAfety Notice on Lessons Learned Programs. This report summarizes work in progress at ITRI to identify lessons learned for worker exposures to radioactive aerosols, and describes how this work will be incorporated into the DOE lessons learned program, including a new technical guide for measuring, modeling, and mitigating airborne radioactive particles. Follow-on work is focusing on preparation of open-quotes lessons learnedclose quotes training materials for facility designers, managers, health protection professionals, line supervisors, and workers

  9. Through Their Eyes: Lessons Learned Using Participatory Methods in Health Care Quality Improvement Projects.

    Science.gov (United States)

    Balbale, Salva N; Locatelli, Sara M; LaVela, Sherri L

    2016-08-01

    In this methodological article, we examine participatory methods in depth to demonstrate how these methods can be adopted for quality improvement (QI) projects in health care. We draw on existing literature and our QI initiatives in the Department of Veterans Affairs to discuss the application of photovoice and guided tours in QI efforts. We highlight lessons learned and several benefits of using participatory methods in this area. Using participatory methods, evaluators can engage patients, providers, and other stakeholders as partners to enhance care. Participant involvement helps yield actionable data that can be translated into improved care practices. Use of these methods also helps generate key insights to inform improvements that truly resonate with stakeholders. Using participatory methods is a valuable strategy to harness participant engagement and drive improvements that address individual needs. In applying these innovative methodologies, evaluators can transcend traditional approaches to uniquely support evaluations and improvements in health care. © The Author(s) 2015.

  10. Lessons learned from MELOX plant operation and support to design of new MOX fuel fabrication plants

    International Nuclear Information System (INIS)

    Tourre, Joel; Gattegno, Robert; Guay, Philippe; Bariteau, Jean-Pierre

    2005-01-01

    AREVA is participating in the design of the US MOX Fuel Fabrication Facility (MFFF). To support this project and allow the U.S. Department of Energy (DOE) client to reap full benefit from the MELOX operating experience, AREVA, through COGEMA and its engineering subsidiary SGN have implemented a rigorous process to prudently apply MELOX Lessons Learned to the MFFF design. This paper describes the Lessons Learned process, how the process supports the advancement of fuel fabrication technology and, how the results of the process are benefiting the client. (author)

  11. Closure of a mixed waste landfill: Lessons learned

    International Nuclear Information System (INIS)

    Phifer, M.A.

    1990-01-01

    Much experience has been gained during the closure of the Mixed Waste Management Facility (MWMF) at the Savannah River Site (SRS) and many lessons were learned. This knowledge was applied to other closures at SRS yielding decreased costs, schedule enhancement, and increased overall project efficiency. The next major area of experience to be gained at SRS in the field of waste site closures will be in the upkeep, maintenance, and monitoring of clay caps. Further test programs will be required to address these requirements

  12. Human Systems Integration in Practice: Constellation Lessons Learned

    Science.gov (United States)

    Zumbado, Jennifer Rochlis

    2012-01-01

    NASA's Constellation program provided a unique testbed for Human Systems Integration (HSI) as a fundamental element of the Systems Engineering process. Constellation was the first major program to have HSI mandated by NASA's Human Rating document. Proper HSI is critical to the success of any project that relies on humans to function as operators, maintainers, or controllers of a system. HSI improves mission, system and human performance, significantly reduces lifecycle costs, lowers risk and minimizes re-design. Successful HSI begins with sufficient project schedule dedicated to the generation of human systems requirements, but is by no means solely a requirements management process. A top-down systems engineering process that recognizes throughout the organization, human factors as a technical discipline equal to traditional engineering disciplines with authority for the overall system. This partners with a bottoms-up mechanism for human-centered design and technical issue resolution. The Constellation Human Systems Integration Group (HSIG) was a part of the Systems Engineering and Integration (SE&I) organization within the program office, and existed alongside similar groups such as Flight Performance, Environments & Constraints, and Integrated Loads, Structures and Mechanisms. While the HSIG successfully managed, via influence leadership, a down-and-in Community of Practice to facilitate technical integration and issue resolution, it lacked parallel top-down authority to drive integrated design. This presentation will discuss how HSI was applied to Constellation, the lessons learned and best practices it revealed, and recommendations to future NASA program and project managers. This presentation will discuss how Human Systems Integration (HSI) was applied to NASA's Constellation program, the lessons learned and best practices it revealed, and recommendations to future NASA program and project managers on how to accomplish this critical function.

  13. Constellation Program: Lessons Learned. Volume 1; Executive Summary

    Science.gov (United States)

    Rhatigan, Jennifer L. (Editor)

    2011-01-01

    This document (Volume I) provides an executive summary of the lessons learned from the Constellation Program. A companion Volume II provides more detailed analyses for those seeking further insight and information. In this volume, Section 1.0 introduces the approach in preparing and organizing the content to enable rapid assimilation of the lessons. Section 2.0 describes the contextual framework in which the Constellation Program was formulated and functioned that is necessary to understand most of the lessons. Context of a former program may seem irrelevant in the heady days of new program formulation. However, readers should take some time to understand the context. Many of the lessons would be different in a different context, so the reader should reflect on the similarities and differences in his or her current circumstances. Section 3.0 summarizes key findings developed from the significant lessons learned at the program level that appear in Section 4.0. Readers can use the key findings in Section 3.0 to peruse for particular topics, and will find more supporting detail and analyses in Section 4.0 in a topical format. Appendix A contains a white paper describing the Constellation Program formulation that may be of use to readers wanting more context or background information. The reader will no doubt recognize some very similar themes from previous lessons learned, blue-ribbon committee reviews, National Academy reviews, and advisory panel reviews for this and other large-scale human spaceflight programs; including Apollo, Space Shuttle, Shuttle/Mir, and the ISS. This could represent an inability to learn lessons from previous generations; however, it is more likely that similar challenges persist in the Agency structure and approach to program formulation, budget advocacy, and management. Perhaps the greatest value of these Constellation lessons learned can be found in viewing them in context with these previous efforts to guide and advise the Agency and its

  14. Lessons learned about coordinating academic partnerships from an international network for health education.

    Science.gov (United States)

    Luo, Airong; Omollo, Kathleen Ludewig

    2013-11-01

    There is a growing trend of academic partnerships between U.S., Canadian, and European health science institutions and academic health centers in low- and middle-income countries. These partnerships often encounter challenges such as resource disparities and power differentials, which affect the motivations, expectations, balance of benefits, and results of the joint projects. Little has been discussed in previous literature regarding the communication and project management processes that affect the success of such partnerships. To fill the gap in the literature, the authors present lessons learned from the African Health Open Educational Resources Network, a multicountry, multiorganizational partnership established in May 2008. The authors introduce the history of the network, then discuss actively engaging stakeholders throughout the project's life cycle (design, planning, execution, and closure) through professional development, relationship building, and assessment activities. They focus on communication and management practices used to identify mutually beneficial project goals, ensure timely completion of deliverables, and develop sustainable sociotechnical infrastructure for future collaborative projects. These activities yielded an interactive process of action, assessment, and reflection to ensure that project goals and values were aligned with implementation. The authors conclude with a discussion of lessons learned and how the partnership project may serve as a model for other universities and academic health centers in high-income countries and low- and middle-income countries that are interested in or currently pursuing international academic partnerships.

  15. A Case Study in Competitive Technical and Market Intelligence Support and Lessons Learned for the uChemLab LDRD Grand Challenge Project; TOPICAL

    International Nuclear Information System (INIS)

    SOUTHWELL, EDWIN T.; GARCIA, MARIE L.; MEYERS, CHARLES E.

    2001-01-01

    The(mu)ChemLab(trademark) Laboratory Directed Research and Development (LDRD) Grand Challenge project began in October 1996 and ended in September 2000. The technical managers of the(mu)ChemLab(trademark) project and the LDRD office, with the support of a consultant, conducted a competitive technical and market demand intelligence analysis of the(mu)ChemLab(trademark). The managers used this knowledge to make project decisions and course adjustments. CTI/MDI positively impacted the project's technology development, uncovered potential technology partnerships, and supported eventual industry partner contacts. CTI/MDI analysis is now seen as due diligence and the(mu)ChemLab(trademark) project is now the model for other Sandia LDRD Grand Challenge undertakings. This document describes the CTI/MDI analysis and captures the more important ''lessons learned'' of this Grand Challenge project, as reported by the project's management team

  16. How the Lean Management System is Working on a Closure Project - 13242

    Energy Technology Data Exchange (ETDEWEB)

    Mowery, Carol [Washington Closure Hanford, 2620 Fermi, Richland, Washington, 99354 (United States)

    2013-07-01

    Washington Closure Hanford, LLC (WCH) manages the River Corridor Closure Project (RCCP), a 10-year contract, in which WCH will clean up 220 mi{sup 2} of contaminated land at the Hanford Site in Richland, Washington. Strategic planning sessions in 2009 identified key performance areas that were essential to closure and in which focused change could result in dramatic performance improvement. Lean Management Systems (Lean) was selected as the methodology to achieve the desired results. The Lean Process is built upon the fundamentals of the power of respect for people and the practice of continuous process improvement. Lean uses week-long, focused sessions that teach a selected team the techniques to recognize waste within their own work processes, propose potential solutions, and then conduct experiments during the week to test their solutions. In 2011, the Lean process was implemented in the Waste Operations organization. From there it was expanded to closure documents, field remediation, and decommissioning and demolition. WCH identified the following Lean focus areas: 1) closure document processes that required extensive internal preparation, and lengthy external review and approval cycles; 2) allocation of limited transportation and waste disposal resources to meet aggressive remediation schedules; 3) effective start-of-the-day routines in field operations; 4) improved excavation and load-out processes; and 5) approaches to strengthen safety culture and support disciplined operations. Since the introduction of Lean, RCCP has realized many successes and also gained some unexpected benefits. (authors)

  17. How the Lean Management System is Working on a Closure Project - 13242

    International Nuclear Information System (INIS)

    Mowery, Carol

    2013-01-01

    Washington Closure Hanford, LLC (WCH) manages the River Corridor Closure Project (RCCP), a 10-year contract, in which WCH will clean up 220 mi 2 of contaminated land at the Hanford Site in Richland, Washington. Strategic planning sessions in 2009 identified key performance areas that were essential to closure and in which focused change could result in dramatic performance improvement. Lean Management Systems (Lean) was selected as the methodology to achieve the desired results. The Lean Process is built upon the fundamentals of the power of respect for people and the practice of continuous process improvement. Lean uses week-long, focused sessions that teach a selected team the techniques to recognize waste within their own work processes, propose potential solutions, and then conduct experiments during the week to test their solutions. In 2011, the Lean process was implemented in the Waste Operations organization. From there it was expanded to closure documents, field remediation, and decommissioning and demolition. WCH identified the following Lean focus areas: 1) closure document processes that required extensive internal preparation, and lengthy external review and approval cycles; 2) allocation of limited transportation and waste disposal resources to meet aggressive remediation schedules; 3) effective start-of-the-day routines in field operations; 4) improved excavation and load-out processes; and 5) approaches to strengthen safety culture and support disciplined operations. Since the introduction of Lean, RCCP has realized many successes and also gained some unexpected benefits. (authors)

  18. Applying Lean Six Sigma to improve medication management.

    Science.gov (United States)

    Nayar, Preethy; Ojha, Diptee; Fetrick, Ann; Nguyen, Anh T

    2016-01-01

    A significant proportion of veterans use dual care or health care services within and outside the Veterans Health Administration (VHA). In this study conducted at a VHA medical center in the USA, the authors used Lean Six Sigma principles to develop recommendations to eliminate wasteful processes and implement a more efficient and effective process to manage medications for dual care veteran patients. The purpose of this study is to: assess compliance with the VHA's dual care policy; collect data and describe the current process for co-management of dual care veterans' medications; and draft recommendations to improve the current process for dual care medications co-management. Input was obtained from the VHA patient care team members to draw a process map to describe the current process for filling a non-VHA prescription at a VHA facility. Data were collected through surveys and direct observation to measure the current process and to develop recommendations to redesign and improve the process. A key bottleneck in the process that was identified was the receipt of the non-VHA medical record which resulted in delays in filling prescriptions. The recommendations of this project focus on the four domains of: documentation of dual care; veteran education; process redesign; and outreach to community providers. This case study describes the application of Lean Six Sigma principles in one urban Veterans Affairs Medical Center (VAMC) in the Mid-Western USA to solve a specific organizational quality problem. Therefore, the findings may not be generalizable to other organizations. The Lean Six Sigma general principles applied in this project to develop recommendations to improve medication management for dual care veterans are applicable to any process improvement or redesign project and has valuable lessons for other VAMCs seeking to improve care for their dual care veteran patients. The findings of this project will be of value to VA providers and policy makers and health

  19. Lessons learned by southern states in designating alternative routes

    International Nuclear Information System (INIS)

    1989-08-01

    The purpose of this report is to discuss the ''lessons learned'' by the five states within the southem region that have designated alternative or preferred routes under the regulations of the Department of Transportation (DOT) established for the transportation of radioactive materials. The document was prepared by reviewing applicable federal laws and regulations, examining state reports and documents and contacting state officials and routing agencies involved in making routing decisions. In undertaking this project, the Southern States Energy Board hopes to reveal the process used by states that have designated alternative routes and thereby share their experiences (i.e., lessons learned) with other southern states that have yet to make designations. Under DOT regulations (49 CFR 177.826), carriers of highway route controlled quantities of radioactive materials (which include spent nuclear fuel and high-level waste) must use preferred routes selected to reduce time in transit. Such preferred routes consist of (1) an interstate system highway with use of an interstate system bypass or beltway around cities when available, and (2) alternate routes selected by a ''state routing agency.''

  20. Operations Strategy Development in Project-based Production – a building contractor implements Lean

    DEFF Research Database (Denmark)

    Koch, Christian; Friis, Ole Uhrskov

    2015-01-01

    Purpose: To study how operations strategy innovation occurs in project-based production and organisation. Design/methodology/approach: A longitudinal case study encompassing the processes at the company headquarters and in two projects using Lean. Findings: The operations strategy development com...

  1. Low-Temperature Projects of the Department of Energy's Geothermal Technologies Program: Evaluation and Lessons Learned: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Tom; Snyder, Neil; Gosnold, Will

    2016-12-01

    This paper discusses opportunities and challenges related to the technical and economic feasibility of developing power generation from geothermal resources at temperatures of 150 degrees C and lower. Insights from projects funded by the U.S. Department of Energy (DOE), Geothermal Technologies Office inform these discussions and provide the basis for some lessons learned to help guide decisions by DOE and the industry in further developing this resource. The technical basis for low-temperature geothermal energy is well established and the systems can be economic today in certain situations. However, these applications are far from a 'plug and play' product; successful development today requires a good knowledge of geothermal system design and operation.

  2. Management and integration of engineering and construction activities: Lessons learned from the AP1000R nuclear power plant China project

    International Nuclear Information System (INIS)

    McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C.

    2012-01-01

    The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, the organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)

  3. Applying lean thinking in construction

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-12-01

    Full Text Available The productivity of the construction industry worldwide has been declining over the past 40 years. One approach for improving the situation is using lean construction. Lean construction results from the application of a new form of production management to construction. Essential features of lean construction include a clear set of objectives for the delivery process, aimed at maximizing performance for the customer at the project level, concurrent design, construction, and the application of project control throughout the life cycle of the project from design to delivery. An increasing number of construction academics and professionals have been storming the ramparts of conventional construction management in an effort to deliver better value to owners while making real profits. As a result, lean-based tools have emerged and have been successfully applied to simple and complex construction projects. In general, lean construction projects are easier to manage, safer, completed sooner, and cost less and are of better quality. Significant research remains to complete the translation to construction of lean thinking in Egypt. This research will discuss principles, methods, and implementation phases of lean construction showing the waste in construction and how it could be minimized. The Last Planner System technique, which is an important application of the lean construction concepts and methodologies and is more prevalent, proved that it could enhance the construction management practices in various aspects. Also, it is intended to develop methodology for process evaluation and define areas for improvement based on lean approach principles.

  4. Regulatory analysis and lessons learned from the LLRW [low-level radioactive waste] disposal area at West Valley, New York: Final report

    International Nuclear Information System (INIS)

    1986-12-01

    The New York State Energy Research and Development Authority has sponsored a project to develop an integrated set of site management plans for the West Valley low-level radioactive waste (LLRW) disposal area. The plans were directed to upgrade the disposal area so that passive custodial care and monitoring activities would be sufficient to protect public health and safety and the environment. Tasks 5 and 6, Regulatory Analysis and Lessons Learned, are the subject of this report. The regulatory analysis identified areas of inconsistencies between the historic site operations and the current state and federal LLRW disposal regulations and guidelines. The lessons learned task identified the causes of the disposal problems at West Valley, discussed the lessons learned, and described the responses developed by the NRC and industry to the lessons learned. 85 refs., 6 figs., 19 tabs

  5. Lessons Learned from Real-Time, Event-Based Internet Science Communications

    Science.gov (United States)

    Phillips, T.; Myszka, E.; Gallagher, D. L.; Adams, M. L.; Koczor, R. J.; Whitaker, Ann F. (Technical Monitor)

    2001-01-01

    For the last several years the Science Directorate at Marshall Space Flight Center has carried out a diverse program of Internet-based science communication. The Directorate's Science Roundtable includes active researchers, NASA public relations, educators, and administrators. The Science@NASA award-winning family of Web sites features science, mathematics, and space news. The program includes extended stories about NASA science, a curriculum resource for teachers tied to national education standards, on-line activities for students, and webcasts of real-time events. The focus of sharing science activities in real-time has been to involve and excite students and the public about science. Events have involved meteor showers, solar eclipses, natural very low frequency radio emissions, and amateur balloon flights. In some cases, broadcasts accommodate active feedback and questions from Internet participants. Through these projects a pattern has emerged in the level of interest or popularity with the public. The pattern differentiates projects that include science from those that do not, All real-time, event-based Internet activities have captured public interest at a level not achieved through science stories or educator resource material exclusively. The worst event-based activity attracted more interest than the best written science story. One truly rewarding lesson learned through these projects is that the public recognizes the importance and excitement of being part of scientific discovery. Flying a camera to 100,000 feet altitude isn't as interesting to the public as searching for viable life-forms at these oxygen-poor altitudes. The details of these real-time, event-based projects and lessons learned will be discussed.

  6. Dimensions of organizational learning: contextual variables in companies under lean manufacturing implementation

    Directory of Open Access Journals (Sweden)

    Guilherme Luz Tortorella

    2014-08-01

    Full Text Available The Lean Production (LP is an approach that encompasses a variety of management practices to reduce losses and improve operational efficiency. Due to this fact, the ability to innovate, change and learn continuously presents itself as a key element in the implementation of the LP. Several contextual variables were mentioned in the literature as potential impediments to implementing lean. However, little is known about the influence of these variables on the dimensions of Organizational Learning (OL. This study aims to examine the relationship between six contextual variables and the frequency of occurrence of problems in companies that are implementing the LP. Furthermore, the identification of relevant relationships between dimensions of OL and contextual variables contribute to the identification of the contexts in which problems can be expected to occur. The sample contains thirteen companies implementing the LP. The results indicate that the same contextual variables, which are deemed as influential to implement LP, have a different influence on the ability of organizational learning.

  7. Lessons learned from the Three Mile Island Unit 2 Advisory Panel

    International Nuclear Information System (INIS)

    Lach, D.; Bolton, P.; Durbin, N.; Harty, R.

    1994-08-01

    In response to public concern about the cleanup of the Three Mile Island, Unit 2 (TMI-2) facility after an accident on March 28, 1979 involving a loss of reactor coolant and subsequent damage to the reactor fuel, twelve citizens were asked to serve on an independent Advisory Panel to consult with the Nuclear Regulatory Commission (NRC) on the decontamination and cleanup of the facility. The panel met 78 times over a period of thirteen years, holding public meetings in the vicinity of TMI-2 and meeting regularly with NRC Commissioners in Washington, DC. This report describes the results of a project designed to identify and describe the lessons learned from the Advisory Panel and place those lessons in the context of what we generally know about citizen advisory groups. A summary of the empirical literature on citizen advisory panels is followed by a brief history of the TMI-2 Advisory Panel. The body of the report contains the analysis of the lessons learned, preliminary conclusions about the effectiveness of the Panel, and implications for the NRC in the use of advisory panels. Data for the report include meeting transcripts and interviews with past and present Panel participants

  8. Reuse, Repurposing and Learning Design--Lessons from the DART Project

    Science.gov (United States)

    Bond, Stephen T.; Ingram, Caroline; Ryan, Steve

    2008-01-01

    Digital Anthropological Resources for Teaching (DART) is a major project examining ways in which the use of online learning activities and repositories can enhance the teaching of anthropology and, by extension, other disciplines. This paper reports on one strand of DART activity, the development of customisable learning activities that can be…

  9. Support of an Active Science Project by a Large Information System: Lessons for the EOS Era

    Science.gov (United States)

    Angelici, Gary L.; Skiles, J. W.; Popovici, Lidia Z.

    1993-01-01

    The ability of large information systems to support the changing data requirements of active science projects is being tested in a NASA collaborative study. This paper briefly profiles both the active science project and the large information system involved in this effort and offers some observations about the effectiveness of the project support. This is followed by lessons that are important for those participating in large information systems that need to support active science projects or that make available the valuable data produced by these projects. We learned in this work that it is difficult for a large information system focused on long term data management to satisfy the requirements of an on-going science project. For example, in order to provide the best service, it is important for all information system staff to keep focused on the needs and constraints of the scientists in the development of appropriate services. If the lessons learned in this and other science support experiences are not applied by those involved with large information systems of the EOS (Earth Observing System) era, then the final data products produced by future science projects may not be robust or of high quality, thereby making the conduct of the project science less efficacious and reducing the value of these unique suites of data for future research.

  10. Case Study of a Project-Based Learning Course in Civil Engineering Design

    Science.gov (United States)

    Gavin, K.

    2011-01-01

    This paper describes the use of project-based learning to teach design skills to civil engineering students at University College Dublin (UCD). The paper first considers the development of problem-based leaning (PBL) as a tool in higher education. The general issues to be considered in the design of the curriculum for a PBL module are reviewed.…

  11. Higher Education ERP: Lessons Learned.

    Science.gov (United States)

    Swartz, Dave; Orgill, Ken

    2001-01-01

    Shares experiences and lessons learned by chief information officers of large universities about enterprise resource planning (ERP). Specifically, provides a framework for approaching an ERP that could save universities millions of dollars. (EV)

  12. Sustainability Through Technology Licensing and Commercialization: Lessons Learned from the TRIAD Project.

    Science.gov (United States)

    Payne, Philip R O

    2014-01-01

    Ongoing transformation relative to the funding climate for healthcare research programs housed in academic and non-profit research organizations has led to a new (or renewed) emphasis on the pursuit of non-traditional sustainability models. This need is often particularly acute in the context of data management and sharing infrastructure that is developed under the auspices of such research initiatives. One option for achieving sustainability of such data management and sharing infrastructure is the pursuit of technology licensing and commercialization, in an effort to establish public-private or equivalent partnerships that sustain and even expand upon the development and dissemination of research-oriented data management and sharing technologies. However, the critical success factors for technology licensing and commercialization efforts are often unknown to individuals outside of the private sector, thus making this type of endeavor challenging to investigators in academic and non-profit settings. In response to such a gap in knowledge, this article will review a number of generalizable lessons learned from an effort undertaken at The Ohio State University to commercialize a prototypical research-oriented data management and sharing infrastructure, known as the Translational Research Informatics and Data Management (TRIAD) Grid. It is important to note that the specific emphasis of these lessons learned is on the early stages of moving a technology from the research setting into a private-sector entity and as such are particularly relevant to academic investigators interested in pursuing such activities.

  13. Lessons Learned from ISS Cooperation

    Science.gov (United States)

    Jolly, C.

    2002-01-01

    Forty years of human spaceflight activities are now culminating in the International Space Station program (ISS). The ISS involves fifteen nations, working together to create a permanently occupied orbital facility that will support scientific and potentially, commercial endeavours. The assembly of the ISS is scheduled to be completed later in this decade, after which it will be operated for at least ten years. At the strategic level, such a complex international project is highly dependent on the fifteen Partners' respective internal politics and foreign policies. On the operational level, Partners still have certain difficulties in issuing and agreeing to common technical procedures. As with almost all aspects of International Space Station cooperation, the Partners are going through a constant learning process, where they have to deal with complex political, legal and operational differences. Intergovernmental Agreement and the Memoranda of Understanding, the instruments forming the legal backbone of the International Space Station cooperation, are still lacking a fair number of arrangements that need to be created for completing and operating the Station. The whole endeavour is also a constant learning process at the operational level, as astronauts, cosmonauts, engineers and technicians on the ground with different cultural and educational backgrounds, learn to work together. One recent Space Shuttle mission to the Station showed the importance of standardising even trivial system components such as packaging labels, as it took the astronauts half a day more than planned to correctly unpack the equipment. This paper will provide a synthesis of some of the main lessons learned during the first few years of International Space Station's lifetime. Important political, legal and operational issues will be addressed and combined. This analysis will provide some guidelines and recommendations for future international space projects, such as an international human

  14. ISS Solar Array Alpha Rotary Joint (SARJ) Bearing Failure and Recovery: Technical and Project Management Lessons Learned

    Science.gov (United States)

    DellaCorte, Christopher; Krantz, Timothy L.; Dube, Michael J.

    2011-01-01

    The photovoltaic solar panels on the International Space Station (ISS) track the Sun through continuous rotating motion enabled by large bearings on the main truss called solar array alpha rotary joints (SARJs). In late 2007, shortly after installation, the starboard SARJ had become hard to turn and had to be shut down after exceeding drive current safety limits. The port SARJ, of the same design, had been working well for over 2 years. An exhaustive failure investigation ensued that included multiple extravehicular activities to collect information and samples for engineering forensics, detailed structural and thermal analyses, and a careful review of the build records. The ultimate root cause was determined to be kinematic design vulnerability coupled with inadequate lubrication, and manufacturing flaws; this was corroborated through ground tests, metallurgical studies, and modeling. A highly successful recovery plan was developed and implemented that included replacing worn and damaged components in orbit and applying space-compatible grease to improve lubrication. Beyond the technical aspects, however, lie several key programmatic lessons learned. These lessons, such as running ground tests to intentional failure to experimentally verify failure modes, are reviewed and discussed so they can be applied to future projects to avoid such problems.

  15. Non-technical impediments to maglev development : a lesson learned study of the Florida Maglev Demonstration Project

    Science.gov (United States)

    1994-04-01

    The objective of this paper is to study lessons learned, to date, from the Orlando experience. Particular attention will be given to the economics of competing modes in the private and public section. That objective will entail identifying the groups...

  16. Solid-State Lighting: Early Lessons Learned on the Way to Market

    Energy Technology Data Exchange (ETDEWEB)

    Sandahl, Linda J.; Cort, Katherine A.; Gordon, Kelly L.

    2013-12-31

    The purpose of this report is to document early challenges and lessons learned in the solid-state lighting (SSL) market development as part of the DOE’s SSL Program efforts to continually evaluate market progress in this area. This report summarizes early actions taken by DOE and others to avoid potential problems anticipated based on lessons learned from the market introduction of compact fluorescent lamps and identifies issues, challenges, and new lessons that have been learned in the early stages of the SSL market introduction. This study identifies and characterizes12 key lessons that have been distilled from DOE SSL program results.

  17. Vitrification operational experiences and lessons learned at the WVDP

    International Nuclear Information System (INIS)

    Hamel, W.F. Jr.; Sheridan, M.J.; Valenti, P.J.

    1997-01-01

    The Vitrification Facility (VF) at the West Valley Demonstration Project (WVDP) commenced full, high-level radioactive waste (HLW) processing activities in July 1996. The HLW consists of a blend of washed plutonium-uranium extraction (PUREX) sludge, neutralized thorium extraction (THOREX) waste, and cesium-loaded zeolite. The waste product is borosilicate glass contained in stainless steel canisters, sealed for eventual disposal in a federal repository. This paper discusses the WVDP vitrification process, focusing on operational experience and lessons learned during the first year of continuous, remote operation

  18. Evaluation of regional project to strengthen national health research systems in four countries in West Africa: lessons learned.

    Science.gov (United States)

    Sombié, Issiaka; Aidam, Jude; Montorzi, Gabriela

    2017-07-12

    Since the Commission on Health Research for Development (COHRED) published its flagship report, more attention has been focused on strengthening national health research systems (NHRS). This paper evaluates the contribution of a regional project that used a participatory approach to strengthen NHRS in four post-conflict West African countries - Guinea-Bissau, Liberia, Sierra Leone and Mali. The data from the situation analysis conducted at the start of the project was compared to data from the project's final evaluation, using a hybrid conceptual framework built around four key areas identified through the analysis of existing frameworks. The four areas are governance and management, capacities, funding, and dissemination/use of research findings. The project helped improve the countries' governance and management mechanisms without strengthening the entire NHRS. In the four countries, at least one policy, plan or research agenda was developed. One country put in place a national health research ethics committee, while all four countries could adopt a research information management system. The participatory approach and support from the West African Health Organisation and COHRED were all determining factors. The lessons learned from this project show that the fragile context of these countries requires long-term engagement and that support from a regional institution is needed to address existing challenges and successfully strengthen the entire NHRS.

  19. Management and integration of engineering and construction activities: Lessons learned from the AP1000{sup R} nuclear power plant China project

    Energy Technology Data Exchange (ETDEWEB)

    McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C. [Westinghouse Electric Company LLC, 1000 Westinghouse Drive, Cranberry Township, PA 16066 (United States)

    2012-07-01

    The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, the organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)

  20. Improving the quality of learning in science through optimization of lesson study for learning community

    Science.gov (United States)

    Setyaningsih, S.

    2018-03-01

    Lesson Study for Learning Community is one of lecturer profession building system through collaborative and continuous learning study based on the principles of openness, collegiality, and mutual learning to build learning community in order to form professional learning community. To achieve the above, we need a strategy and learning method with specific subscription technique. This paper provides a description of how the quality of learning in the field of science can be improved by implementing strategies and methods accordingly, namely by applying lesson study for learning community optimally. Initially this research was focused on the study of instructional techniques. Learning method used is learning model Contextual teaching and Learning (CTL) and model of Problem Based Learning (PBL). The results showed that there was a significant increase in competence, attitudes, and psychomotor in the four study programs that were modelled. Therefore, it can be concluded that the implementation of learning strategies in Lesson study for Learning Community is needed to be used to improve the competence, attitude and psychomotor of science students.

  1. Lean programm as a method of managing lean changes in the company

    Directory of Open Access Journals (Sweden)

    Suetina Tatiana Aleksandrovna

    2012-12-01

    Full Text Available This article is about methods and ways of providing changes on enterprices which introduce instruments of lean production. The main accent is how to use metodology of the project management by providing lean-changes. Lean program is proposed as a program of strategic developement of enterprices.

  2. Prototype Applications Of Blended Learning On The Lessons Of Project Management Information System MPSI In College

    Directory of Open Access Journals (Sweden)

    Riswan

    2015-08-01

    Full Text Available This research is further than the initial research has been done on the lessons of project management information system MPSI. Included in the seminar of the International Conference on Technical and Vocation Education and Training High on a hill on the 16th-17th-October 2015 organized by the State University of Padang UNP. As well as on The 2016 Jambi International Seminars on Education JISE in Jambi Indonesia 3-4 April 2016. The results of initial research showed that the quality of the teaching model of face-to-face with MPSI konvensioanal are on enough categories so that needs to be developed a Blended Learning model that is merging model of face-to-face with e-learning model in order to improve the quality of teaching for the better. The results of a pretest data analysis on a class of experiments and classroom control showed results not much different 12.32 for classes experiments and 11.12 for the classroom control. Test of normality that is done for the second class also shows a normal distribution. Where r count for a class experiment 00060 01772 r tables and r count for class control 00572 01772 r tables. Now this research has already come to the stage of prototype application design blended learning will be in validation by an expert of computer design.

  3. A Summary of the Rendezvous, Proximity Operations, Docking, and Undocking (RPODU) Lessons Learned from the Defense Advanced Research Project Agency (DARPA) Orbital Express (OE) Demonstration System Mission

    Science.gov (United States)

    Dennehy, Cornelius J.; Carpenter, James R.

    2011-01-01

    The Guidance, Navigation, and Control (GN&C) Technical Discipline Team (TDT) sponsored Dr. J. Russell Carpenter, a Navigation and Rendezvous Subject Matter Expert (SME) from NASA's Goddard Space Flight Center (GSFC), to provide support to the Defense Advanced Research Project Agency (DARPA) Orbital Express (OE) rendezvous and docking flight test that was conducted in 2007. When that DARPA OE mission was completed, Mr. Neil Dennehy, NASA Technical Fellow for GN&C, requested Dr. Carpenter document his findings (lessons learned) and recommendations for future rendezvous missions resulting from his OE support experience. This report captures lessons specifically from anomalies that occurred during one of OE's unmated operations.

  4. Functionality for learning networks: lessons learned from social web applications

    NARCIS (Netherlands)

    Berlanga, Adriana; Sloep, Peter; Brouns, Francis; Van Rosmalen, Peter; Bitter-Rijpkema, Marlies; Koper, Rob

    2007-01-01

    Berlanga, A. J., Sloep, P., Brouns, F., Van Rosmalen, P., Bitter-Rijpkema, M., & Koper, R. (2007). Functionality for learning networks: lessons learned from social web applications. Proceedings of the ePortfolio 2007 Conference. October, 18-19, 2007, Maastricht, The Netherlands. [See also

  5. TH-C-9A-01: Lean Tools and Methods

    International Nuclear Information System (INIS)

    Rangaraj, D; Chan, K; Boddu, S; Pawlicki, T; Dieterich, S

    2014-01-01

    Lean thinking has revolutionized the manufacturing industry. Toyota has pioneered and leveraged this aspect of Lean thinking. Application of Lean thinking and Lean Six Sigma techniques into Healthcare and in particular in Radiation Oncology has its merits and challenges. To improve quality, safety and patient satisfaction with available resources or reducing cost in terms of time, staff and resources is demands of today's healthcare. Radiation oncology treatment involves many processes and steps, identifying and removing the non-value added steps in a process can significantly improve the efficiency. Real projects undertaken in radiation oncology department in cutting down the procedure time for MRI guided brachytherapy to 40% less using lean thinking will be narrated. Simple Lean tools and techniques such as Gemba walk, visual control, daily huddles, standard work, value stream mapping, error-proofing, etc. can be applied with existing resources and how that improved the operation in a Radiation Oncology department's two year experience will be discussed. Lean thinking focuses on identifying and solving the root-cause of a problem by asking “Why” and not “Who” and this requires a culture change of no blame. Role of leadership in building lean culture, employee empowerment and trains and develops lean thinkers will be presented. Why Lean initiatives fail and how to implement lean successfully in your clinic will be discussed. Learning Objectives: Concepts of lean management or lean thinking. Lean tools and techniques applied in Radiation Oncology. Implement no blame culture and focus on system and processes. Leadership role in implementing lean culture. Challenges for Lean thinking in healthcare

  6. TH-C-9A-01: Lean Tools and Methods

    Energy Technology Data Exchange (ETDEWEB)

    Rangaraj, D [Baylor Scott and White Health, Temple, TX (United States); Chan, K [Princess Margaret Hospital, Toronto (Canada); Boddu, S [Temple, TX (United States); Pawlicki, T [UC San Diego, La Jolla, CA (United States); Dieterich, S [UC Davis Medical Center, Sacramento, CA (United States)

    2014-06-15

    Lean thinking has revolutionized the manufacturing industry. Toyota has pioneered and leveraged this aspect of Lean thinking. Application of Lean thinking and Lean Six Sigma techniques into Healthcare and in particular in Radiation Oncology has its merits and challenges. To improve quality, safety and patient satisfaction with available resources or reducing cost in terms of time, staff and resources is demands of today's healthcare. Radiation oncology treatment involves many processes and steps, identifying and removing the non-value added steps in a process can significantly improve the efficiency. Real projects undertaken in radiation oncology department in cutting down the procedure time for MRI guided brachytherapy to 40% less using lean thinking will be narrated. Simple Lean tools and techniques such as Gemba walk, visual control, daily huddles, standard work, value stream mapping, error-proofing, etc. can be applied with existing resources and how that improved the operation in a Radiation Oncology department's two year experience will be discussed. Lean thinking focuses on identifying and solving the root-cause of a problem by asking “Why” and not “Who” and this requires a culture change of no blame. Role of leadership in building lean culture, employee empowerment and trains and develops lean thinkers will be presented. Why Lean initiatives fail and how to implement lean successfully in your clinic will be discussed. Learning Objectives: Concepts of lean management or lean thinking. Lean tools and techniques applied in Radiation Oncology. Implement no blame culture and focus on system and processes. Leadership role in implementing lean culture. Challenges for Lean thinking in healthcare.

  7. Lessons Learned in Risk Management on NCSX

    International Nuclear Information System (INIS)

    Neilson, G.H.; Gruber, C.O.; Harris, Jeffrey H.; Rej, D.J.; Simmons, R.T.; Strykowsky, R.L.

    2010-01-01

    The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and subassemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, which was established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-2008. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks were ultimately unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project.

  8. Lessons Learned in Risk Management on NCSX

    International Nuclear Information System (INIS)

    Neilson, G.H.; Gruber, C.O.; Harris, J.H.; Rej, D.J.; Simmons, R.T.; Strykowsky, R.L.

    2009-01-01

    The National Compact Stellarator Experiment (NCSX) was designed to test physics principles of an innovative stellarator design developed by the Princeton Plasma Physics Laboratory and Oak Ridge National Laboratory. Construction of some of the major components and sub-assemblies was completed, but the estimated cost and schedule for completing the project grew as the technical requirements and risks became better understood, leading to its cancellation in 2008. The project's risks stemmed from its technical challenges, primarily the complex component geometries and tight tolerances that were required. The initial baseline, established in 2004, was supported by a risk management plan and risk-based contingencies, both of which proved to be inadequate. Technical successes were achieved in the construction of challenging components and subassemblies, but cost and schedule growth was experienced. As part of an effort to improve project performance, a new risk management program was devised and implemented in 2007-08. It led to a better understanding of project risks, a sounder basis for contingency estimates, and improved management tools. Although the risks ultimately were unacceptable to the sponsor, valuable lessons in risk management were learned through the experiences with the NCSX project

  9. DSCOVR Contamination Lessons Learned

    Science.gov (United States)

    Graziani, Larissa

    2015-01-01

    The Triana observatory was built at NASA GSFC in the late 1990's, then placed into storage. After approximately ten years it was removed from storage and repurposed as the Deep Space Climate Observatory (DSCOVR). This presentation outlines the contamination control program lessons learned during the integration, test and launch of DSCOVR.

  10. Case study: the Argentina Road Safety Project: lessons learned for the decade of action for road safety, 2011-2020.

    Science.gov (United States)

    Raffo, Veronica; Bliss, Tony; Shotten, Marc; Sleet, David; Blanchard, Claire

    2013-12-01

    This case study of the Argentina Road Safety Project demonstrates how the application of World Bank road safety project guidelines focused on institution building can accelerate knowledge transfer, scale up investment and improve the focus on results. The case study highlights road safety as a development priority and outlines World Bank initiatives addressing the implementation of the World Report on Road Traffic Injury's recommendations and the subsequent launch of the Decade of Action for Road Safety, from 2011-2020. The case study emphasizes the vital role played by the lead agency in ensuring sustainable road safety improvements and promoting the shift to a 'Safe System' approach, which necessitated the strengthening of all elements of the road safety management system. It summarizes road safety performance and institutional initiatives in Argentina leading up to the preparation and implementation of the project. We describe the project's development objectives, financing arrangements, specific components and investment staging. Finally, we discuss its innovative features and lessons learned, and present a set of supplementary guidelines, both to assist multilateral development banks and their clients with future road safety initiatives, and to encourage better linkages between the health and transportation sectors supporting them.

  11. Applying Lean-Six-Sigma Methodology in radiotherapy: Lessons learned by the breast daily repositioning case.

    Science.gov (United States)

    Mancosu, Pietro; Nicolini, Giorgia; Goretti, Giulia; De Rose, Fiorenza; Franceschini, Davide; Ferrari, Chiara; Reggiori, Giacomo; Tomatis, Stefano; Scorsetti, Marta

    2018-03-06

    Lean Six Sigma Methodology (LSSM) was introduced in industry to provide near-perfect services to large processes, by reducing improbable occurrence. LSSM has been applied to redesign the 2D-2D breast repositioning process (Lean) by the retrospective analysis of the database (Six Sigma). Breast patients with daily 2D-2D matching before RT were considered. The five DMAIC (define, measure, analyze, improve, and control) LSSM steps were applied. The process was retrospectively measured over 30 months (7/2014-12/2016) by querying the RT Record&Verify database. Two Lean instruments (Poka-Yoke and Visual Management) were considered for advancing the process. The new procedure was checked over 6 months (1-6/2017). 14,931 consecutive shifts from 1342 patients were analyzed. Only 0.8% of patients presented median shifts >1 cm. The major observed discrepancy was the monthly percentage of fractions with almost zero shifts (AZS = 13.2% ± 6.1%). Ishikawa fishbone diagram helped in defining the main discrepancy con-causes. Procedure harmonization involving a multidisciplinary team to increase confidence in matching procedure was defined. AZS was reduced to 4.8% ± 0.6%. Furthermore, distribution symmetry improvement (Skewness moved from 1.4 to 1.1) and outlier reduction, verified by Kurtosis diminution, demonstrated a better "normalization" of the procedure after the LSSM application. LSSM was implemented in a RT department, allowing to redesign the breast repositioning matching procedure. Copyright © 2018 Elsevier B.V. All rights reserved.

  12. Lessons learned from a whole hospital PACS installation. Picture Archiving and Communication System.

    Science.gov (United States)

    Pilling, J R

    2002-09-01

    The Norfolk and Norwich University Hospital has incorporated a fully filmless Picture Archiving and Communication System (PACS) as part of a new hospital provision using PFI funding. The PACS project has been very successful and has met with unanimous acclaim from radiologists and clinicians. A project of this size cannot be achieved without learning some lessons from mistakes and recognising areas where attention to detail resulted in a successful implementation. This paper considers the successes and problems encountered in a large PACS installation.

  13. Lessons learned from the NEPTUNE power system, and other deep-sea adventures

    International Nuclear Information System (INIS)

    Kirkham, Harold

    2006-01-01

    The development of underwater science systems presents some challenging technical issues. It seems that the best efforts of the engineers and scientists involved are sometimes inadequate, and projects that once seemed straightforward end up being late or over-budget, or cancelled. This paper will review some of the lessons that may be learned from the examples of three science projects in the deep ocean: the Deep Underwater Muon and Neutrino Detector neutrino detector, the H 2 O observatory, and the power system part of the NEPTUNE regional cabled observatory

  14. Lessons Learned In Developing The VACIS Products

    International Nuclear Information System (INIS)

    Orphan, Victor J.

    2011-01-01

    SAIC's development of VACIS provides useful 'lessons learned' in bridging the gap from an idea to a security or contraband detection product. From a gamma densitometer idea for solving a specific Customs Service (CS) requirement (detection of drugs in near-empty tanker trucks) in mid-1990's, SAIC developed a broad line of vehicle and cargo inspections systems (over 500 systems deployed to date) based on a gamma-ray radiographic imaging technique. This paper analyzes the reasons for the successful development of VACIS and attempts to identify ''lessons learned'' useful for future security and contraband detection product developments.

  15. Dynasting Theory: Lessons in learning grounded theory

    Directory of Open Access Journals (Sweden)

    Johnben Teik-Cheok Loy, MBA, MTS, Ph.D.

    2011-06-01

    Full Text Available This article captures the key learning lessons gleaned from the author’s experience learning and developing a grounded theory for his doctoral dissertation using the classic methodology as conceived by Barney Glaser. The theory was developed through data gathered on founders and successors of Malaysian Chinese family-own businesses. The main concern for Malaysian Chinese family businesses emerged as dynasting . the building, maintaining, and growing the power and resources of the business within the family lineage. The core category emerged as dynasting across cultures, where founders and successors struggle to transition from traditional Chinese to hybrid cultural and modernized forms of family business from one generation to the next. The key learning lessons were categorized under five headings: (a sorting through different versions of grounded theory, (b educating and managing research stakeholders, (c embracing experiential learning, (d discovering the core category: grounded intuition, and (e recognizing limitations and possibilities.Keywords: grounded theory, learning, dynasting, family business, Chinese

  16. Looking within and beyond the community: lessons learned by researching, theorising and acting to address urban poverty and health.

    Science.gov (United States)

    Hodgetts, Darrin; Chamberlain, Kerry; Tankel, Yadena; Groot, Shiloh

    2014-01-01

    Urban poverty and health inequalities are inextricably intertwined. By working in partnership with service providers and communities to address urban poverty, we can enhance the wellness of people in need. This article reflects on lessons learned from the Family100 project that explores the everyday lives, frustrations and dilemmas faced by 100 families living in poverty in Auckland. Lessons learned support the need to bring the experiences and lived realities of families to the fore in public deliberations about community and societal responses to urban poverty and health inequality.

  17. XML technology planning database : lessons learned

    Science.gov (United States)

    Some, Raphael R.; Neff, Jon M.

    2005-01-01

    A hierarchical Extensible Markup Language(XML) database called XCALIBR (XML Analysis LIBRary) has been developed by Millennium Program to assist in technology investment (ROI) analysis and technology Language Capability the New return on portfolio optimization. The database contains mission requirements and technology capabilities, which are related by use of an XML dictionary. The XML dictionary codifies a standardized taxonomy for space missions, systems, subsystems and technologies. In addition to being used for ROI analysis, the database is being examined for use in project planning, tracking and documentation. During the past year, the database has moved from development into alpha testing. This paper describes the lessons learned during construction and testing of the prototype database and the motivation for moving from an XML taxonomy to a standard XML-based ontology.

  18. Clinical software development for the Web: lessons learned from the BOADICEA project.

    Science.gov (United States)

    Cunningham, Alex P; Antoniou, Antonis C; Easton, Douglas F

    2012-04-10

    In the past 20 years, society has witnessed the following landmark scientific advances: (i) the sequencing of the human genome, (ii) the distribution of software by the open source movement, and (iii) the invention of the World Wide Web. Together, these advances have provided a new impetus for clinical software development: developers now translate the products of human genomic research into clinical software tools; they use open-source programs to build them; and they use the Web to deliver them. Whilst this open-source component-based approach has undoubtedly made clinical software development easier, clinical software projects are still hampered by problems that traditionally accompany the software process. This study describes the development of the BOADICEA Web Application, a computer program used by clinical geneticists to assess risks to patients with a family history of breast and ovarian cancer. The key challenge of the BOADICEA Web Application project was to deliver a program that was safe, secure and easy for healthcare professionals to use. We focus on the software process, problems faced, and lessons learned. Our key objectives are: (i) to highlight key clinical software development issues; (ii) to demonstrate how software engineering tools and techniques can facilitate clinical software development for the benefit of individuals who lack software engineering expertise; and (iii) to provide a clinical software development case report that can be used as a basis for discussion at the start of future projects. We developed the BOADICEA Web Application using an evolutionary software process. Our approach to Web implementation was conservative and we used conventional software engineering tools and techniques. The principal software development activities were: requirements, design, implementation, testing, documentation and maintenance. The BOADICEA Web Application has now been widely adopted by clinical geneticists and researchers. BOADICEA Web

  19. Social learning in transnational projectslessons from European territorial cooperation projects

    Directory of Open Access Journals (Sweden)

    Joern Harfst

    2015-04-01

    Full Text Available Old industrial regions in Europe have undergone radical changes in the last decades. After downsizing or closure of predominant industries such regions usually face big challenges concerning their economic, social and ecological futures. One chance to master this transformation process is the identification and sustainable utilisation of potentials left by industrial production. Utilisation of regional potentials, commonly categorized as natural and cultural potentials, was the aim of two transnational cooperation projects ReSource and SHIFT-X, which were both funded by European Union’s Development Fund (ERDF, INTERREG IVB. The paper shows how the involvement of research partners in the projects supported and facilitated joint learning effects and knowledge transfer between all project partners. It is argued that on the one hand such an approach offers important mutual benefits for partners, while on the other hand the realisation of such benefits remains a challenging task in a transnational collaboration. In declining industrial regions, especially when characterised by small- and medium-sized towns, the capacities to act are scarce and any outside intervention is often seen more as an unwanted factor that additionally stretches resources and provides little advantages for such regions. Therefore one of the main aims in transnational collaboration has to be the establishment of a trustful and committed working relation between all partners. The engagement in the projects has shown that the joint work between regional actors and the external academic partners can create important transnational learning effects for all involved; nevertheless it has to overcome certain reservations on all sides before innovative ways can be pursued successfully.

  20. Lessons Learned Following the Successful Decommissioning of a Reaction Vessel Containing Lime Sludge and Technetium-99

    International Nuclear Information System (INIS)

    Dawson, P. M.; Watson, D. D.; Hylko, J. M.

    2002-01-01

    This paper documents how WESKEM, LLC utilized available source term information, integrated safety management, and associated project controls to safely decommission a reaction vessel and repackage sludge containing various Resource Conservation and Recovery Act constituents and technetium-99 (Tc-99). The decommissioning activities were segmented into five separate stages, allowing the project team to control work related decisions based on their knowledge, experience, expertise, and field observations. The information and experience gained from each previous stage and rehearsals contributed to modifying subsequent entries, further emphasizing the importance of developing hold points and incorporating lessons learned. The hold points and lessons learned, such as performing detailed personal protective equipment (PPE) inspections during sizing and repackaging operations, and using foam-type piping insulation to prevent workers from cutting or puncturing their PPE on sharp edge s or small shards generated during sizing operations, minimized direct contact with the Tc-99. To prevent the spread of contamination, the decommissioning activities were performed inside a containment enclosure connected to negative air machines. After performing over 235 individual entries totaling over 285 project hours, only one first aid was recorded during this five-stage project

  1. Case Study of Lessons Learned from the Operation of the Fast Flux Test Facility

    International Nuclear Information System (INIS)

    Wootan, D.; Omberg, R.; Grandy, C.

    2016-01-01

    Full text: The lessons learned approach being followed at the Fast Flux Test Facility is to have domain experts in each subject area develop a short write-up or report on each lesson learned. Each lesson learned write-up is on the order of 4–6 pages. Longer reports can be developed as needed. Each lessons learned summary discusses the problem and the resolution method employed to address the problem, and also tries to capture the essential “tacit knowledge” associated with each topic in a focused manner. All lessons learned write-ups are supported by more detailed documents. For example, references of more detailed reports are generally included, where available. Topics are selected as those most likely to apply to future design or operating problems. This lessons learned approach has been successful in capturing essential tacit knowledge about key events in FFTF history and providing a context for interpreting the existing data and references. (author

  2. Using Selective Redundancy and Testing to Optimize Learning from Multimedia Lessons

    OpenAIRE

    Yue, Carole Leigh

    2014-01-01

    Multimedia learning refers to learning from a combination of words and images. In the present dissertation, a multimedia lesson is defined as an animated, narrated educational video that depicts a scientific process--a format of instructional material becoming increasingly common in online, hybrid, and traditional classrooms. The overarching goal of the present research was to investigate how to optimize learning from multimedia lessons using two related theories of multimedia learning (the...

  3. Solid-State Lighting. Early Lessons Learned on the Way to Market

    Energy Technology Data Exchange (ETDEWEB)

    Sandahl, L. J.; Cort, K. A.; Gordon, K. L.

    2014-01-01

    Analysis of issues and lessons learned during the early stages of solid-state lighting market introduction in the U.S., which also summarizes early actions taken to avoid potential problems anticipated based on lessons learned from the market introduction of compact fluorescent lamps.

  4. Lessons learned from completed evaluation reviews (1983 to mid-1993). Special evaluation review

    International Nuclear Information System (INIS)

    1993-01-01

    With this in mind, the Agency in 1983 set up in the Department of Technical Co-operation an Evaluation Unit (upgraded to Section rank in 1986), to assist already existing self-evaluation efforts through a more systematic and independent approach and thus provide senior management with the information required for more efficient and effective programme planning and implementation. A first analysis of the lessons learned through technical co-operation evaluation was carried out after five years, in mid-1988. It included both lessons learned with regard to the procedures and components of the programme, in general, as well as the findings specific to individual projects or groups of projects, and reported on the resulting administrative changes introduced by the Agency with a view to improving the programme. The current review, covering the second five-year period, from mid-1988 to mid-1993, continued along the same lines, while also illustrating the changing pattern in the work of the Evaluation Section itself. In order to present a full picture of the activities and results of ten years of TC evaluation, this report combines the results of both reviews

  5. Organizational safety factors research lessons learned

    International Nuclear Information System (INIS)

    Ryan, T.G.

    1995-01-01

    This Paper reports lessons learned and state of knowledge gained from an organizational factors research activity involving commercial nuclear power plants in the United States, through the end of 1991, as seen by the scientists immediately involved in the research. Lessons learned information was gathered from the research teams and individuals using a question and answer format. The following five questions were submitted to each team and individual: (1) What organizational factors appear to influence safety performance in some systematic way, (2) Should organizational factors research focus at the plant level, or should it extend beyond the plant level to the parent company, rate setting commissions, regulatory agencies, (3) How important is having direct access to plants for doing organizational factors research, (4) What lessons have been learned to date as the result of doing organizational factors research in a nuclear regulatory setting, and (5) What organizational research topics and issues should be pursued in the future? Conclusions based on the responses provided for this report are that organizational factors research can be conducted in a regulatory setting and produce useful results. Technologies pioneered in other academic, commercial, and military settings can be adopted for use in a nuclear regulatory setting. The future success of such research depends upon the cooperation of regulators, contractors, and the nuclear industry

  6. Lessons learned from the decommissioning of NORM facility in Malaysia

    International Nuclear Information System (INIS)

    Kontol, Khairuddin M.; Omar, Muhamat; Ahmad, Syed H.S.S.

    2008-01-01

    Full text: Malaysia Decommissioning of Naturally Occurring Radioactive Materials (NORM) facility in Malaysia will run into unforeseeable complications and difficulties if there is no proper planning. The Atomic Energy Licensing Board (AELB) plays important role in guiding and assisting the operator/contractor in this NORM decommissioning project. A local Naturally Occurring Radioactive Materials (NORM) processing plant located in the northern region of peninsular Malaysia had ceased its operations and decided to decommission and remediate its site for the final release of the site. The remediated site is earmarked as an industrial site. During its operations, monazites are processed for rare earth elements such as cerium and lanthanum. It's plant capable of processing monazite to produce rare earth chloride and rare earth carbonate. The main by-product of monazite processing is the radioactive cake containing primarily thorium hydroxide. Operation of the monazite processing plant started in early eighties and terminated in early nineties. The decommissioning of the plant site started in late 2003 and completed its decommissioning and remediation works in early 2006. This paper described the lesson learned by Malaysian Nuclear Agency (Nuclear Malaysia) in conducting third party independent audit for the decommissioning of the NORM contaminated facility. By continuously reviewing the lessons learned, mistakes and/or inefficiencies in this plant decommissioning project, hopefully will result in a smoother, less costly and more productive future decommissioning works on NORM facilities in Malaysia. (author)

  7. Lessons learned and advice from Vietnam war nurses: a qualitative study.

    Science.gov (United States)

    Scannell-Desch, Elizabeth A

    2005-03-01

    The aim of this paper is to describe guidance for nurses today from the lessons learned by nurses who served in the Vietnam War. There is little research focusing on nurses' experiences in the Vietnam War. Lessons learned and subsequent advice from nurses who served in Vietnam may be helpful to those serving in current and future wars. A Husserlian phenomenological approach was taken, using interviews with a purposive sample of Registered Nurses who were female, and had served in the United States of America armed forces in Vietnam during the war. Seven theme clusters described the lesson learned and guidance offered by the Vietnam War nurses: advice about journaling, training, caring for yourself, use of support systems, talking about your experiences, understanding the mission, and lack of preparation for war. Much can be learned from the lessons learned and advice given by Vietnam War nurses. These lessons stress that nurses need to take a pro-active role in preparing themselves for deployment to a war zone, and that institutional training for war needs to be intensive and realistic. The environmental, cultural, technological, clinical and psychosocial demands of war nursing need to be comprehensively addressed before nurses deploy to a war.

  8. Lessons from Iowa : development of a 270 megawatt compressed air energy storage project in midwest Independent System Operator : a study for the DOE Energy Storage Systems Program.

    Energy Technology Data Exchange (ETDEWEB)

    Holst, Kent (Iowa Stored Energy Plant Agency, Traer, IA); Huff, Georgianne; Schulte, Robert H. (Schulte Associates LLC, Northfield, MN); Critelli, Nicholas (Critelli Law Office PC, Des Moines, IA)

    2012-01-01

    The Iowa Stored Energy Park was an innovative, 270 Megawatt, $400 million compressed air energy storage (CAES) project proposed for in-service near Des Moines, Iowa, in 2015. After eight years in development the project was terminated because of site geological limitations. However, much was learned in the development process regarding what it takes to do a utility-scale, bulk energy storage facility and coordinate it with regional renewable wind energy resources in an Independent System Operator (ISO) marketplace. Lessons include the costs and long-term economics of a CAES facility compared to conventional natural gas-fired generation alternatives; market, legislative, and contract issues related to enabling energy storage in an ISO market; the importance of due diligence in project management; and community relations and marketing for siting of large energy projects. Although many of the lessons relate to CAES applications in particular, most of the lessons learned are independent of site location or geology, or even the particular energy storage technology involved.

  9. Are Agile and Lean Manufacturing Systems Employing Sustainability, Complexity and Organizational Learning?

    Science.gov (United States)

    Flumerfelt, Shannon; Siriban-Manalang, Anna Bella; Kahlen, Franz-Josef

    2012-01-01

    Purpose: This paper aims to peruse theories and practices of agile and lean manufacturing systems to determine whether they employ sustainability, complexity and organizational learning. Design/methodology/approach: The critical review of the comparative operational similarities and difference of the two systems was conducted while the new views…

  10. Carbon Monitoring System Applications Framework: Lessons Learned from Stakeholder Engagement Activities

    Science.gov (United States)

    Sepulveda Carlo, E.; Escobar, V. M.; Delgado Arias, S.; Forgotson, C.

    2017-12-01

    The NASA Carbon Monitoring System initiated by U.S. Congress in 2010 is developing products that characterize and quantify carbon sources and sinks in the United States and the global tropics. In 2013, an applications effort was selected to engage potential end users and gather feedback about their data needs. For the past four years the CMS applications efforts has expanded and implemented a number of strategies to connect carbon scientists to decision-makers, contributing to the societal benefits of CMS data products. The applications efforts use crowd sourcing to collects feedback from stakeholders on challenges and lessons learned in the use of CMS data products. Some of the most common data needs from engaged organizations include above and below-ground biomass and fluxes in forestlands and wetlands, and greenhouse gas (GHG) emissions across all land use/cover and land use changes. Stakeholder organizations' needs for CMS data products support national GHG inventories following the Paris Agreement, carbon markets, and sub-national natural resources management and policies. The lessons learned report presents stakeholder specific applications, challenges, and successes from using CMS data products. To date, the most common uses of CMS products include: conservation efforts, emissions inventory, forestry and land cover applications, and carbon offset projects. The most common challenges include: the need for familiar and consistent products over time, budget constraints, and concern with uncertainty of modeled results. Recurrent recommendations from stakeholder indicate that CMS should provide high resolution (30m) and frequent data products updates (annually). The applications efforts have also helped identified success stories from different CMS projects, including the development of the GHG emissions inventory from Providence, RI, the improvement of the U.S. GHG Inventory though the use of satellite data, and the use of high resolution canopy cover maps for

  11. Blended learning: strengths, challenges, and lessons learned in an interprofessional training program.

    Science.gov (United States)

    Lotrecchiano, G R; McDonald, P L; Lyons, L; Long, T; Zajicek-Farber, M

    2013-11-01

    This field report outlines the goals of providing a blended learning model for an interdisciplinary training program for healthcare professionals who care for children with disabilities. The curriculum blended traditional face-to-face or on-site learning with integrated online interactive instruction. Credit earning and audited graduate level online coursework, community engagement experiences, and on-site training with maternal and child health community engagement opportunities were blended into a cohesive program. The training approach emphasized adult learning principles in different environmental contexts integrating multiple components of the Leadership Education in Neurodevelopmental and Related Disabilities Program. This paper describes the key principles adopted for this blended approach and the accomplishments, challenges, and lessons learned. The discussion offers examples from training content, material gathered through yearly program evaluation, as well as university course evaluations. The lessons learned consider the process and the implications for the role of blended learning in this type of training program with suggestions for future development and adoption by other programs.

  12. Implementing a lessons learned process at Sandia National Laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Fosshage, Erik D.; Drewien, Celeste A.; Eras, Kenneth; Hartwig, Ronald Craig; Post, Debra S.; Stoecker, Nora Kathleen

    2016-01-01

    The Lessons Learned Process Improvement Team was tasked to gain an understanding of the existing lessons learned environment within the major programs at Sandia National Laboratories, identify opportunities for improvement in that environment as compared to desired attributes, propose alternative implementations to address existing inefficiencies, perform qualitative evaluations of alternative implementations, and recommend one or more near-term activities for prototyping and/or implementation. This report documents the work and findings of the team.

  13. Lessons learned from the 1994 Northridge Earthquake

    International Nuclear Information System (INIS)

    Eli, M.W.; Sommer, S.C.

    1995-01-01

    Southern California has a history of major earthquakes and also has one of the largest metropolitan areas in the United States. The 1994 Northridge Earthquake challenged the industrial facilities and lifetime infrastructure in the northern Los Angeles (LA) area. Lawrence Livermore National Laboratory (LLNL) sent a team of engineers to conduct an earthquake damage investigation in the Northridge area, on a project funded jointly by the United States Nuclear Regulatory Commission (USNRC) and the United States Department of Energy (USDOE). Many of the structures, systems, and components (SSCs) and lifelines that suffered damage are similar to those found in nuclear power plants and in USDOE facilities. Lessons learned from these experiences can have some applicability at commercial nuclear power plants

  14. Lessons Learned From Microkernel Verification — Specification is the New Bottleneck

    Directory of Open Access Journals (Sweden)

    Thorsten Bormer

    2012-11-01

    Full Text Available Software verification tools have become a lot more powerful in recent years. Even verification of large, complex systems is feasible, as demonstrated in the L4.verified and Verisoft XT projects. Still, functional verification of large software systems is rare – for reasons beyond the large scale of verification effort needed due to the size alone. In this paper we report on lessons learned for verification of large software systems based on the experience gained in microkernel verification in the Verisoft XT project. We discuss a number of issues that impede widespread introduction of formal verification in the software life-cycle process.

  15. Implementing CDIO project-based learning in training of Heat and Power engineers

    Science.gov (United States)

    Boiko, E. A.; Shishmarev, P. V.; Karabarin, D. I.; Yanov, S. R.; Pikalova, A. A.

    2017-11-01

    This paper presents the experience and current results of CDIO standards implementation in training of bachelors in Heat and Power Engineering at Thermal Power Stations academic department in Siberian Federal University. It provides information on methodology of modernization of educational programs, curricula and programs of disciplines in transition to CDIO project-based learning technology. Preliminary assessment and analysis of lessons learned and scaling perspectives are given.

  16. Sharing Lessons Learned Between Industries in EU

    International Nuclear Information System (INIS)

    Muehleisen, A.; Strucic, M.

    2012-01-01

    Recent events in nuclear industry remind us on importance of continuous sharing of the knowledge and experience gained through evaluations of incidents and accidents. We frequently use experience from our daily life activities to improve our performance and avoid some mistakes or unwanted events. In the similar way we can use other industries experience. These experiences can be applied to improve nuclear safety. For example, Safety Culture, which has a great influence on the level of nuclear power plants safety, is similarly presented in other industries. Mechanisms which led to accidents from weak safety culture in one branch of other industry could be comparable to those in nuclear industry. Some other industries have many more cumulative years of experience than nuclear industry. Aviation and Oil industries are typical representatives. Part of their experience can be used in nuclear industry too. Number of reports from nuclear power plants showed us that not only specific equipment related causes lay behind accidents; there are also other causes and contributors which are more common for all industries. Hence lessons learned in other industry should be assessed and used in nuclear industry too. In the European Union, a regional initiative has been set up in 2008 in support of EU Member State nuclear safety authorities, but also EU technical support organizations, international organizations and the broader nuclear community, to enhance nuclear safety through improvement of the use of lessons learned from operational experience of nuclear power plants (NPPs). The initiative, called ''the EU Clearinghouse on Operational Experience Feedback for NPP'', is organized as a network operated by a centralized office located at the Joint Research Centre of the European Commission. The reduction of occurrence and significance of events in NPPs and their safe operation is its ultimate goal. Among others EU Clearinghouse provides services such as technical and scientific

  17. Formation of community-based hypertension practice networks: success, obstacles, and lessons learned.

    Science.gov (United States)

    Dart, Richard A; Egan, Brent M

    2014-06-01

    Community-based practice networks for research and improving the quality of care are growing in size and number but have variable success rates. In this paper, the authors review recent efforts to initiate a community-based hypertension network modeled after the successful Outpatient Quality Improvement Network (O'QUIN) project, located at the Medical University of South Carolina. Key lessons learned and new directions to be explored are highlighted. ©2014 Wiley Periodicals, Inc.

  18. LEAN and energy efficiency; Lean og energieffektivisering

    Energy Technology Data Exchange (ETDEWEB)

    Jespersen, Per T; Vesterager Christensen, D; Andersen, Hans [Teknologisk Institut, Energi og Klima, Taastrup (Denmark); Dam Wied, M; Dam, M [NRGi Raadgivning, Aarhus (Denmark); Thorndahl, M [Horsens Kommune, Horsens (Denmark); Weldingh, P [Lokal Energi, Viby J. (Denmark); Maagoee, P; Kristensen, Kenneth T [Viegand og Maagoee, Copenhagen (Denmark); Kirketerp Friis, A [Novozymes, Bagsvaerd (Denmark)

    2010-03-15

    By means of theoretical reports and three specific cases, the project showed how Lean principles can improve energy consulting efficiency, thus making it easier for end-users and energy consultants to record and document energy savings achieved. The three cases documented various types of extra benefits of integrating energy efficiency improvement in Lean processes. As a result of process optimisation, one manufacturing company successfully reduced both staffing and energy consumption, thus making production in Denmark competitive with out-sourced production in Asia. (LN)

  19. Developing tools for the safety specification in risk management plans: lessons learned from a pilot project.

    Science.gov (United States)

    Cooper, Andrew J P; Lettis, Sally; Chapman, Charlotte L; Evans, Stephen J W; Waller, Patrick C; Shakir, Saad; Payvandi, Nassrin; Murray, Alison B

    2008-05-01

    Following the adoption of the ICH E2E guideline, risk management plans (RMP) defining the cumulative safety experience and identifying limitations in safety information are now required for marketing authorisation applications (MAA). A collaborative research project was conducted to gain experience with tools for presenting and evaluating data in the safety specification. This paper presents those tools found to be useful and the lessons learned from their use. Archive data from a successful MAA were utilised. Methods were assessed for demonstrating the extent of clinical safety experience, evaluating the sensitivity of the clinical trial data to detect treatment differences and identifying safety signals from adverse event and laboratory data to define the extent of safety knowledge with the drug. The extent of clinical safety experience was demonstrated by plots of patient exposure over time. Adverse event data were presented using dot plots, which display the percentages of patients with the events of interest, the odds ratio, and 95% confidence interval. Power and confidence interval plots were utilised for evaluating the sensitivity of the clinical database to detect treatment differences. Box and whisker plots were used to display laboratory data. This project enabled us to identify new evidence-based methods for presenting and evaluating clinical safety data. These methods represent an advance in the way safety data from clinical trials can be analysed and presented. This project emphasises the importance of early and comprehensive planning of the safety package, including evaluation of the use of epidemiology data.

  20. Lessons learned from application of the Swedish regulations for decommissioning of nuclear facilities - The regulator's perspective

    International Nuclear Information System (INIS)

    Efraimsson, Henrik; Amft, Martin; Leisvik, Mathias

    2016-01-01

    The paper presents an overview of the Swedish regulations for decommissioning of nuclear facilities. It describes some of the experiences that the Swedish Radiation Safety Authority has gained from the application of these regulations. The focus of the present paper lies on administrative aspects of the care and maintenance operation and on the safety related documentation that has to be prepared before dismantling commences. Lessons learned during recent years will be considered when revising the regulations for decommissioning. Also these lessons learned will help to streamline the administration of the large NPP decommissioning projects that are anticipated to commence in Sweden in the near future. (authors)

  1. Application of Technology in Project-Based Distance Learning

    Directory of Open Access Journals (Sweden)

    Ali Mehrabian

    2008-06-01

    Full Text Available Present technology and the accessibility of internet have made distance learning easier, more efficient, and more convenient for students. This technology allows instructors and students to communicate asynchronously, at times and locations of their own choosing, by exchanging printed or electronic information. The use of project-based approach is being recognized in the literature as a potential component of courses in the faculties of engineering, science, and technology. Instructors may have to restructure their course differently to accommodate and facilitate the effectiveness of distance learning. A project-based engineering course, traditionally taught in a classroom settings using live mode at the College of Engineering and Computer Sciences at the University of Central Florida (UCF has been transformed to a distance course taught using distance modes. In this case, pedagogical transitions and adjustments are required, in particular for obtaining an optimal balance between the course material and the project work. Project collaboration in groups requires communication, which is possible with extensive utilization of new information and communication technology, such as virtual meetings. This paper discusses the course transition from live to distance modes and touches on some issues as they relate to the effectiveness of this methodology and the lessons learned from its application within different context. More specifically, this discussion includes the benefit of implementing project-based work in the domain of the distance learning courses.

  2. International Space Station Passive Thermal Control System Analysis, Top Ten Lessons-Learned

    Science.gov (United States)

    Iovine, John

    2011-01-01

    The International Space Station (ISS) has been on-orbit for over 10 years, and there have been numerous technical challenges along the way from design to assembly to on-orbit anomalies and repairs. The Passive Thermal Control System (PTCS) management team has been a key player in successfully dealing with these challenges. The PTCS team performs thermal analysis in support of design and verification, launch and assembly constraints, integration, sustaining engineering, failure response, and model validation. This analysis is a significant body of work and provides a unique opportunity to compile a wealth of real world engineering and analysis knowledge and the corresponding lessons-learned. The analysis lessons encompass the full life cycle of flight hardware from design to on-orbit performance and sustaining engineering. These lessons can provide significant insight for new projects and programs. Key areas to be presented include thermal model fidelity, verification methods, analysis uncertainty, and operations support.

  3. Lessons Learned from the Puerto Rico Battery Energy Storage System

    Energy Technology Data Exchange (ETDEWEB)

    BOYES, JOHN D.; DE ANA, MINDI FARBER; TORRES, WENCESLANO

    1999-09-01

    The Puerto Rico Electric Power Authority (PREPA) installed a distributed battery energy storage system in 1994 at a substation near San Juan, Puerto Rico. It was patterned after two other large energy storage systems operated by electric utilities in California and Germany. The U.S. Department of Energy (DOE) Energy Storage Systems Program at Sandia National Laboratories has followed the progress of all stages of the project since its inception. It directly supported the critical battery room cooling system design by conducting laboratory thermal testing of a scale model of the battery under simulated operating conditions. The Puerto Rico facility is at present the largest operating battery storage system in the world and is successfully providing frequency control, voltage regulation, and spinning reserve to the Caribbean island. The system further proved its usefulness to the PREPA network in the fall of 1998 in the aftermath of Hurricane Georges. The owner-operator, PREPA, and the architect/engineer, vendors, and contractors learned many valuable lessons during all phases of project development and operation. In documenting these lessons, this report will help PREPA and other utilities in planning to build large energy storage systems.

  4. Community-based interventions for obesity prevention: lessons learned by Australian policy-makers

    Directory of Open Access Journals (Sweden)

    Haby Michelle M

    2012-01-01

    Full Text Available Abstract Background Interest in community-based interventions (CBIs for health promotion is increasing, with a lot of recent activity in the field. This paper aims, from a state government perspective, to examine the experience of funding and managing six obesity prevention CBIs, to identify lessons learned and to consider the implications for future investment. Specifically, we focus on the planning, government support, evaluation, research and workforce development required. Methods The lessons presented in this paper come from analysis of key project documents, the experience of the authors in managing the projects and from feedback obtained from key program stakeholders. Results CBIs require careful management, including sufficient planning time and clear governance structures. Selection of interventions should be based on evidence and tailored to local needs to ensure adequate penetration in the community. Workforce and community capacity must be assessed and addressed when selecting communities. Supporting the health promotion workforce to become adequately skilled and experienced in evaluation and research is also necessary before implementation. Comprehensive evaluation of future projects is challenging on both technical and affordability grounds. Greater emphasis may be needed on process evaluation complemented by organisation-level measures of impact and monitoring of nutrition and physical activity behaviours. Conclusions CBIs offer potential as one of a mix of approaches to obesity prevention. If successful approaches are to be expanded, care must be taken to incorporate lessons from existing and past projects. To do this, government must show strong leadership and work in partnership with the research community and local practitioners.

  5. Effects of basic character design and animation concepts using the flipped learning and project-based learning approach on learning achievement and creative thinking of higher education students

    Science.gov (United States)

    Autapao, Kanyarat; Minwong, Panthul

    2018-01-01

    Creative thinking was an important learning skill in the 21st Century via learning and innovation to promote students' creative thinking and working with others and to construct innovation. This is one of the important skills that determine the readiness of the participants to step into the complex society. The purposes of this research were 1) to compare the learning achievement of students after using basic character design and animation concepts using the flipped learning and project-based learning and 2) to make a comparison students' creative thinking between pretest and posttest. The populations were 29 students in Multimedia Technology program at Thepsatri Rajabhat University in the 2nd semester of the academic year 2016. The experimental instruments were lesson plans of basic character design and animation concepts using the flipped learning and project based learning. The data collecting instrument was creative thinking test. The data were analyzed by the arithmetic mean, standard deviation and The Wilcoxon Matched Pairs Signed-Ranks Test. The results of this research were 1) the learning achievement of students were statistically significance of .01 level and 2) the mean score of student's creativity assessment were statistically significance of .05 level. When considering all of 11 KPIs, showed that respondents' post-test mean scores higher than pre-test. And 5 KPIs were statistically significance of .05 level, consist of Originality, Fluency, Elaboration, Resistance to Premature Closure, and Intrinsic Motivation. It's were statistically significance of .042, .004, .049, .024 and .015 respectively. And 6 KPIs were non-statistically significant, include of Flexibility, Tolerance of Ambiguity, Divergent Thinking, Convergent Thinking, Risk Taking, and Extrinsic Motivation. The findings revealed that the flipped learning and project based learning provided students the freedom to simply learn on their own aptitude. When working together with project

  6. Basic safety principles: Lessons learned

    International Nuclear Information System (INIS)

    Erp, J.B. van

    1997-01-01

    The presentation reviews the following issues: basic safety principles and lessons learned; some conclusions from the Kemeny report on the accident at TMI; some recommendations from the Kemeny report on the accident at TMI; conclusions and recommendations from the Rogovin report on the accident on TMI; instrumentation deficiencies (from Rogovin report)

  7. Basic safety principles: Lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Erp, J.B. van [Argonne National Lab., IL (United States)

    1997-09-01

    The presentation reviews the following issues: basic safety principles and lessons learned; some conclusions from the Kemeny report on the accident at TMI; some recommendations from the Kemeny report on the accident at TMI; conclusions and recommendations from the Rogovin report on the accident on TMI; instrumentation deficiencies (from Rogovin report).

  8. Lessons learned from community-based approaches to sodium reduction.

    Science.gov (United States)

    Kane, Heather; Strazza, Karen; Losby, Jan L; Lane, Rashon; Mugavero, Kristy; Anater, Andrea S; Frost, Corey; Margolis, Marjorie; Hersey, James

    2015-01-01

    This article describes lessons from a Centers for Disease Control and Prevention initiative encompassing sodium reduction interventions in six communities. A multiple case study design was used. This evaluation examined data from programs implemented in six communities located in New York (Broome County, Schenectady County, and New York City); California (Los Angeles County and Shasta County); and Kansas (Shawnee County). Participants (n = 80) included program staff, program directors, state-level staff, and partners. Measures for this evaluation included challenges, facilitators, and lessons learned from implementing sodium reduction strategies. The project team conducted a document review of program materials and semistructured interviews 12 to 14 months after implementation. The team coded and analyzed data deductively and inductively. Five lessons for implementing community-based sodium reduction approaches emerged: (1) build relationships with partners to understand their concerns, (2) involve individuals knowledgeable about specific venues early, (3) incorporate sodium reduction efforts and messaging into broader nutrition efforts, (4) design the program to reduce sodium gradually to take into account consumer preferences and taste transitions, and (5) identify ways to address the cost of lower-sodium products. The experiences of the six communities may assist practitioners in planning community-based sodium reduction interventions. Addressing sodium reduction using a community-based approach can foster meaningful change in dietary sodium consumption.

  9. BLENDED LEARNING: STUDENT PERCEPTION OF FACE-TO-FACE AND ONLINE EFL LESSONS

    Directory of Open Access Journals (Sweden)

    Brenda M. Wright

    2017-05-01

    Full Text Available With the ever-increasing development of technology, online teaching is more readily accepted as a viable component in teaching and learning, and blended learning, the combining of online and face-to-face learning, is becoming commonplace in many higher education institutions. Blended learning is, particularly in developing countries, in its early stages and not without its challenges. Asynchronous online lessons are currently still more prevalent in many areas of South-East Asia, perhaps due to potential difficulty in obtaining strong Internet connections, which may deter educators from synchronous options. Technological media have the potential to broaden the scope of resources available in teaching and to enhance the language learning experience. Although research to date shows some focus on blended learning, literature on distance online teaching seems more prevalent. This study exposed 112 Malaysian undergraduate EFL students' responses to an online lesson as part of an English grammar course, and investigates common student perceptions of the online lesson as compared with face-to-face lessons. Questionnaires using qualitative (Likert scale questions and quantitative (open-ended questions approaches provided data for content analysis to determine common student perceptions, with particular reference to motivation and interest. In general, more students associated in-class lessons with higher motivation and more interest, due to better understanding, valued classroom interaction with the lecturer and peers, and input from the lecturer. Students preferring the online lesson cited speed and convenience of study and flexibility of time and place of study as reasons for their choice. Skilful implementation of online lessons can enhance a language course but should not undermine the value of face-to-face instruction with EFL teachers.

  10. Co-Creation Learning Procedures: Comparing Interactive Language Lessons for Deaf and Hearing Students.

    Science.gov (United States)

    Hosono, Naotsune; Inoue, Hiromitsu; Tomita, Yutaka

    2017-01-01

    This paper discusses co-creation learning procedures of second language lessons for deaf students, and sign language lessons by a deaf lecturer. The analyses focus on the learning procedure and resulting assessment, considering the disability. Through questionnaires ICT-based co-creative learning technologies are effective and efficient and promote spontaneous learning motivation goals.

  11. WHC significant lessons learned 1993--1995

    Energy Technology Data Exchange (ETDEWEB)

    Bickford, J.C.

    1997-12-12

    A lesson learned as defined in DOE-STD-7501-95, Development of DOE Lessons Learned Programs, is: A ``good work practice`` or innovative approach that is captured and shared to promote repeat applications or an adverse work practice or experience that is captured and shared to avoid a recurrence. The key word in both parts of this definition is ``shared``. This document was published to share a wide variety of recent Hanford experiences with other DOE sites. It also provides a valuable tool to be used in new employee and continuing training programs at Hanford facilities and at other DOE locations. This manual is divided into sections to facilitate extracting appropriate subject material when developing training modules. Many of the bulletins could be categorized into more than one section, however, so examination of other related sections is encouraged.

  12. Social support and child protection: Lessons learned and learning.

    Science.gov (United States)

    Thompson, Ross A

    2015-03-01

    Social support has been a topic of research for nearly 50 years, and its applications to prevention and intervention have grown significantly, including programs advancing child protection. This article summarizes the central conclusions of the 1994 review of research on social support and the prevention of child maltreatment prepared for the U.S. Advisory Board on Child Abuse and Neglect, and surveys advances in the field since its publication. Among the lessons learned twenty years ago are (a) the diversity of the social support needs of at-risk families and their association with child endangerment, (b) the need to supplement the emotionally affirmative aspects of social support with efforts to socialize parenting practices and monitor child well-being, (c) the desirability of integrating formal and informal sources of social support for recipients, and (d) the importance of considering the complex recipient reactions to receiving support from others. The lessons we are now learning derive from research exploring the potential of online communication to enhance social support, the neurobiology of stress and its buffering through social support, and the lessons of evaluation research that are identifying the effective ingredients of social support interventions. Copyright © 2014 Elsevier Ltd. All rights reserved.

  13. Experiential Learning: Lessons Learned from the UND Business and Government Symposium

    Science.gov (United States)

    Harsell, Dana Michael; O'Neill, Patrick B.

    2010-01-01

    The authors describe lessons learned from a limited-duration experiential learning component of a Master's level course. The course is open to Master's in Business and Master's in Public Administration students and explores the relationships between government and business. A complete discussion of the Master's in Business and Master's in Public…

  14. Assessment of Lean Construction Principles: A Case Study at Semarang Medical Centre Hospital Project

    Directory of Open Access Journals (Sweden)

    Matias Roy Adi Wijaya

    2016-06-01

    Full Text Available The lean construction frameworks have been developed for years to enhance the poor performance of Indonesian project delivery system which influenced by the waste of non-value adding activities. Never the less most of the developments were limited on working process and lack in people empowerment. Toyota Way which integrate working process optimization and people empowerment, was developed as a lean construction frame works. This paper aimed to assess the implementation of Toyota Way principles in project delivery system by observing project’s delivery current state (status quo. The assessment began by conducting a questionnaire survey about Toyota Way implementation which then validated by interview with involved stakeholders and field observation. The assessment showed that project’s stakeholders were still unfamiliar with Toyota Way concept. Although some Toyota Way guidelines have been used in projects completion process such as visual management and training program, it found that those guidelines had not fully implemented. The project delivery system was lack of process focus and concerns more on relationship inter-parties. It also found thatToyota Way implementation will constrained by the difficulties to change the status quo of project delivery. Moreover, it seems that construction projects need practical guidelines to simplify the Toyota Way implementation in project delivery system such as project flow evaluation and system of reflection.

  15. Lessons Learned in International Safeguards - Implementation of Safeguards at the Rokkasho Reprocessing Plant

    International Nuclear Information System (INIS)

    Ehinger, Michael H.; Johnson, Shirley

    2010-01-01

    The focus of this report is lessons learned at the Rokkasho Reprocessing Plant (RRP). However, the subject of lessons learned for application of international safeguards at reprocessing plants includes a cumulative history of inspections starting at the West Valley (New York, U.S.A.) reprocessing plant in 1969 and proceeding through all of the efforts over the years. The RRP is the latest and most challenging application the International Atomic Energy Agency has faced. In many ways the challenges have remained the same, timely inspection and evaluation with limited inspector resources, with the continuing realization that planning and preparations can never start early enough in the life cycle of a facility. Lessons learned over the years have involved the challenges of using ongoing advances in technology and dealing with facilities with increased throughput and continuous operation. This report will begin with a review of historical developments and lessons learned. This will provide a basis for a discussion of the experiences and lessons learned from the implementation of international safeguards at RRP.

  16. Lessons Learned from the Node 1 Temperature and Humidity Control Subsystem Design

    Science.gov (United States)

    Williams, David E.

    2010-01-01

    Node 1 flew to the International Space Station (ISS) on Flight 2A during December 1998. To date the National Aeronautics and Space Administration (NASA) has learned a lot of lessons from this module based on its history of approximately two years of acceptance testing on the ground and currently its twelve years on-orbit. This paper will provide an overview of the ISS Environmental Control and Life Support (ECLS) design of the Node 1 Temperature and Humidity Control (THC) subsystem and it will document some of the lessons that have been learned to date for this subsystem and it will document some of the lessons that have been learned to date for these subsystems based on problems prelaunch, problems encountered on-orbit, and operational problems/concerns. It is hoped that documenting these lessons learned from ISS will help in preventing them in future Programs. 1

  17. A World of Learning: Practical Manual. Enhancing the Multiplier Effect of the Associated Schools Project.

    Science.gov (United States)

    United Nations Educational, Scientific, and Cultural Organization, Paris (France).

    This manual presents the major lessons learned about how national authorities, individual institutions, and individual educators can work to increase the impact of the Associated Schools Project (ASP) schools and spread it to other parts of the educational system. ASP is a project of the United Nations Educational, Scientific and Cultural…

  18. Ares Launch Vehicles Lean Practices Case Study

    Science.gov (United States)

    Doreswamy, Rajiv, N.; Self, Timothy A.

    2008-01-01

    This viewgraph presentation describes test strategies and lean philisophies and practices that are applied to Ares Launch Vehicles. The topics include: 1) Testing strategy; 2) Lean Practices in Ares I-X; 3) Lean Practices Applied to Ares I-X Schedule; 4) Lean Event Results; 5) Lean, Six Sigma, and Kaizen Practices in the Ares Projects Office; 6) Lean and Kaizen Success Stories; and 7) Ares Six Sigma Practices.

  19. Professor's Page: Do Demonstration Lessons Work?

    Science.gov (United States)

    Clarke, Doug

    2011-01-01

    As part of a large research and professional development project funded by the Catholic Education Office Melbourne (CEOM), called "Contemporary Teaching and Learning of Mathematics," the ACU team has been leading demonstration lessons. There is certainly not universal agreement on the worth of demonstration lessons in the mathematics…

  20. Lessons learned in crisis management.

    Science.gov (United States)

    Olson, Chris

    2014-01-01

    This paper will explore lessons learned following a series of natural and man-made disasters affecting the Massachusetts Mutual Life Insurance Company and/or its subsidiaries. The company employs a team of certified continuity professionals who are charged with overseeing resilience on behalf of the enterprise and leading recovery activities wherever and whenever necessary.

  1. Learning Lean: A Survey of Industry Lean Needs

    Science.gov (United States)

    Fliedner, Gene; Mathieson, Kieran

    2009-01-01

    The authors examined business practitioners' preferences for higher education curricula design in general and for what graduates should know about Lean, or waste-reduction efforts. The authors conducted a Web-based survey and found that practitioners are not as concerned about graduates' possessing specific technical skills as they are about them…

  2. Contribution of Lean Management to Excellence

    Directory of Open Access Journals (Sweden)

    López-Fresno Palmira

    2014-11-01

    Full Text Available To continuously and systematically improve efficiency and efficacy of processes, organizations need the implication of all employees in continuous improvement and innovation through suitable Quality Management Programs (QMPs. Effectiveness of these programs is directly linked to the requirement employees understand the methodologies and tools used for QM and the benefits that will derivate from their implementation, individually and collectively, so they can commit and implicate. Lean Management is a friendly methodology to continuously and systematically achieve process improvement, so helping the organization seeking operational excellence that contributes to overall excellence. This paper identifies Critical Success Factors (CSFs for an effective implementation of QMPs, suggests Lean Management as an easy-to-understand, powerful and friendly methodology for operational excellence and overall excellence, and presents a case experience of implementation of Lean Management in a health care organization that applies the EFQM model, and the lessons learnt.

  3. International experience in the implementation of the lessons learned from the Three Mile Island incident

    International Nuclear Information System (INIS)

    1983-08-01

    This document consists of two parts and an Appendix. Part I provides a summary of worldwide experiences and subsequent recommendations regarding the implementation of the Three Mile Island-Unit 2 incident lessons learned. Part II gives in a summary fashion, specific responses and actions of the mentioned countries and international organizations as categorized into ten (10) subject areas. The Appendix, on the other hand, contains examples of the experiences of Brazil, Germany (F.R.), Hungary, and the Philippines, on the implementation of TMI lessons learned. This document should be useful to countries with nuclear power development programmes in that it provides a means for comparison of their actions with others. For countries which are embarking on their first nuclear power project, the document should provide a useful reference for specific TMI-related issues that need to be considered in their nuclear programmes

  4. Commissioning MMS: Challenges and Lessons Learned

    Science.gov (United States)

    Wood, Paul; Gramling, Cheryl; Reiter, Jennifer; Smith, Patrick; Stone, John

    2016-01-01

    This paper discusses commissioning of NASA's Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  5. A Simulation of Lean Manufacturing: The Lean Lemonade Tycoon 2

    Science.gov (United States)

    Ncube, Lisa B.

    2010-01-01

    This article discusses the functions and effectiveness of games and simulations in the learning processes, in particular as an experiential learning methodology. The application of the game Lemonade Tycoon in the development of lean manufacturing concepts is described. This article addresses the use of the game to teach the principles of lean…

  6. Constellation Lessons Learned Executive Summary

    Science.gov (United States)

    Thomas, L. Dale; Neubek, Deb

    2011-01-01

    This slide presentation reviews the lessons learned from the Constellation Program (CxP) and identified several factors that contributed to the inability of the CxP to meet the cost and schedule commitments. The review includes a significant section on the context in which the CxP operated since new programs are likely to experience the same constraints.

  7. An Aural Learning Project: Assimilating Jazz Education Methods for Traditional Applied Pedagogy

    Science.gov (United States)

    Gamso, Nancy M.

    2011-01-01

    The Aural Learning Project (ALP) was developed to incorporate jazz method components into the author's classical practice and her applied woodwind lesson curriculum. The primary objective was to place a more focused pedagogical emphasis on listening and hearing than is traditionally used in the classical applied curriculum. The components of the…

  8. Improving the primary school science learning unit about force and motion through lesson study

    Science.gov (United States)

    Phaikhumnam, Wuttichai; Yuenyong, Chokchai

    2018-01-01

    The study aimed to develop primary school science lesson plan based on inquiry cycle (5Es) through lesson study. The study focused on the development of 4 primary school science lesson plans of force and motion for Grade 3 students in KKU Demonstration Primary School (Suksasart), first semester of 2015 academic year. The methodology is mixed method. The Inthaprasitha (2010) lesson study cycle was implemented in group of KKU Demonstration Primary School. Instruments of reflection of lesson plan developing included participant observation, meeting and reflection report, lesson plan and other document. The instruments of examining students' learning include classroom observation and achievement test. Data was categorized from these instruments to find the issues of changing and improving the good lesson plan of Thai primary school science learning. The findings revealed that teachers could develop the lesson plans through lesson study. The issues of changing and improving were disused by considering on engaging students related to societal issues, students' prior knowledge, scientific concepts for primary school students, and what they learned from their changing. It indicated that the Lesson Study allowed primary school science teachers to share ideas and develop ideas to improve the lesson. The study may have implications for Thai science teacher education through Lesson Study.

  9. Global polio eradication initiative: lessons learned and legacy.

    Science.gov (United States)

    Cochi, Stephen L; Freeman, Andrew; Guirguis, Sherine; Jafari, Hamid; Aylward, Bruce

    2014-11-01

    The world is on the verge of achieving global polio eradication. During >25 years of operations, the Global Polio Eradication Initiative (GPEI) has mobilized and trained millions of volunteers, social mobilizers, and health workers; accessed households untouched by other health initiatives; mapped and brought health interventions to chronically neglected and underserved communities; and established a standardized, real-time global surveillance and response capacity. It is important to document the lessons learned from polio eradication, especially because it is one of the largest ever global health initiatives. The health community has an obligation to ensure that these lessons and the knowledge generated are shared and contribute to real, sustained changes in our approach to global health. We have summarized what we believe are 10 leading lessons learned from the polio eradication initiative. We have the opportunity and obligation to build a better future by applying the lessons learned from GPEI and its infrastructure and unique functions to other global health priorities and initiatives. In so doing, we can extend the global public good gained by ending for all time one of the world's most devastating diseases by also ensuring that these investments provide public health dividends and benefits for years to come. Published by Oxford University Press on behalf of the Infectious Diseases Society of America 2014. This work is written by (a) US Government employee(s) and is in the public domain in the US.

  10. WHY CANT WE LEARN FROM OUR MISTAKES LEARN THE LESSON TELL THE STORY

    International Nuclear Information System (INIS)

    LANGSTAFF, D.C.

    2005-01-01

    Tell the story well and people can learn from the lesson. The United States Department of Energy (DOE) Office of Environmental Management (EM) and its contractors are pursuing environmental remediation at the Hanford Site. This endeavor has been underway for a number of years, both at Hanford and at other sites across the DOE complex. Independently, the occurrence of two fatalities on two Sites at opposite ends of the country within two weeks raised the question, ''What is going on in the Field?'' Corporate EM management communicated directly with Field Office Managers to answer the question. As a result of this intense interest and focused communication, EM identified four areas that need additional exploration. One of those is, ''EM's ability to learn from its mistakes.'' The need to cultivate the ability to learn from our mistakes is not unique to DOE. A quick review of EM Lessons Learned reports shows that most of the reports in the EM system originate at the sites with the largest budgets doing the most work. Not surprising. A second look, however, reveals that many reports are repetitive, that many people might consider many reports trivial, and that reports on some of the more significant events sometimes take a long time to get distributed across the DOE Complex. Spot checks of event reports revealed frequent identification of symptoms rather than root causes. With a high percentage of identified root causes in the questionable category, it is highly unlikely that the real root causes of many events are being corrected, thus leading to recurrences of events. To learn the lesson from an event, people need to be aware of the root causes of the event. Someone has to tell a story the reader can learn from, i.e., include all the information needed to understand what happened and why it happened. Most importantly, they need to understand the lesson to be learned

  11. Resettling refugees and safeguarding their mental health: lessons learned from the Canadian Refugee Resettlement Project.

    Science.gov (United States)

    Beiser, Morton

    2009-12-01

    The Ryerson University Refugee Resettlement Project (RRP), a decade-long study of 1348 Southeast Asian refugees who came to Canada between 1979 and 1981, is one of the largest, most comprehensive and longest-lived investigations of refugee resettlement ever carried out. Knowledge gleaned from the RRP about research methodology, about the resettlement experience, about the social costs of resettling refugees, about factors that promote or hinder integration, about risk and protective factors for refugee mental health, and about the refugees' consumption of mental health and social services is summarized in the form of 18 "Lessons." The lessons are offered in order to encourage and stimulate further research, as well to suggest policy and practice innovations that could help make resettlement easier, less costly, more effective, and more humane.

  12. Lessons learned? Selected public acceptance case studies since Three Mile Island

    Energy Technology Data Exchange (ETDEWEB)

    Blee, D. [NAC International, Atlanta Corporate Headquarters, Atlanta, GA (United States)

    2001-02-01

    This paper will present an overview of the present situation, some recent polling survey information, and then look at lessons learned in terms of selected case studies and some global issues over the 22 years since the Three Mile Island (TMI) accident. That is quite an ambitious topic but there are some important lessons we can learn from the post-TMI era. (author)

  13. Development of a public health reporting data warehouse: lessons learned.

    Science.gov (United States)

    Rizi, Seyed Ali Mussavi; Roudsari, Abdul

    2013-01-01

    Data warehouse projects are perceived to be risky and prone to failure due to many organizational and technical challenges. However, often iterative and lengthy processes of implementation of data warehouses at an enterprise level provide an opportunity for formative evaluation of these solutions. This paper describes lessons learned from successful development and implementation of the first phase of an enterprise data warehouse to support public health surveillance at British Columbia Centre for Disease Control. Iterative and prototyping approach to development, overcoming technical challenges of extraction and integration of data from large scale clinical and ancillary systems, a novel approach to record linkage, flexible and reusable modeling of clinical data, and securing senior management support at the right time were the main factors that contributed to the success of the data warehousing project.

  14. Mobile Learning vs. Traditional Classroom Lessons: A Comparative Study

    Science.gov (United States)

    Furió, D.; Juan, M.-C.; Seguí, I.; Vivó, R.

    2015-01-01

    Different methods can be used for learning, and they can be compared in several aspects, especially those related to learning outcomes. In this paper, we present a study in order to compare the learning effectiveness and satisfaction of children using an iPhone game for learning the water cycle vs. the traditional classroom lesson. The iPhone game…

  15. N Reactor Lessons Learned workshop

    International Nuclear Information System (INIS)

    Heaberlin, S.W.

    1993-07-01

    This report describes a workshop designed to introduce participants to a process, or model, for adapting LWR Safety Standards and Analysis Methods for use on rector designs significantly different than LWR. The focus of the workshop is on the ''Lessons Learned'' from the multi-year experience in the operation of N Reactor and the efforts to adapt the safety standards developed for commercial light water reactors to a graphite moderated, water cooled, channel type reactor. It must be recognized that the objective of the workshop is to introduce the participants to the operation of a non-LWR in a LWR regulatory world. The total scope of this topic would take weeks to provide a through overview. The objective of this workshop is to provide an introduction and hopefully establish a means to develop a longer term dialogue for technical exchange. This report provides outline of the workshop, a proposed schedule of the workshop, and a description of the tasks will be required to achieve successful completion of the project

  16. Lessons Learned From Community-Based Approaches to Sodium Reduction

    Science.gov (United States)

    Kane, Heather; Strazza, Karen; Losby PhD, Jan L.; Lane, Rashon; Mugavero, Kristy; Anater, Andrea S.; Frost, Corey; Margolis, Marjorie; Hersey, James

    2017-01-01

    Purpose This article describes lessons from a Centers for Disease Control and Prevention initiative encompassing sodium reduction interventions in six communities. Design A multiple case study design was used. Setting This evaluation examined data from programs implemented in six communities located in New York (Broome County, Schenectady County, and New York City); California (Los Angeles County and Shasta County); and Kansas (Shawnee County). Subjects Participants (n = 80) included program staff, program directors, state-level staff, and partners. Measures Measures for this evaluation included challenges, facilitators, and lessons learned from implementing sodium reduction strategies. Analysis The project team conducted a document review of program materials and semi structured interviews 12 to 14 months after implementation. The team coded and analyzed data deductively and inductively. Results Five lessons for implementing community-based sodium reduction approaches emerged: (1) build relationships with partners to understand their concerns, (2) involve individuals knowledgeable about specific venues early, (3) incorporate sodium reduction efforts and messaging into broader nutrition efforts, (4) design the program to reduce sodium gradually to take into account consumer preferences and taste transitions, and (5) identify ways to address the cost of lower-sodium products. Conclusion The experiences of the six communities may assist practitioners in planning community-based sodium reduction interventions. Addressing sodium reduction using a community-based approach can foster meaningful change in dietary sodium consumption. PMID:24575726

  17. Stand-alone photovoltaic applications. Lessons learned

    International Nuclear Information System (INIS)

    Loois, G.; Van Hemert, B.

    1999-02-01

    The IEA Photovoltaic Power Systems Programme (PVPS) is one of the collaborative R and D agreements established within the IEA. The objective of Task III is to promote and facilitate the exchange of information and experiences in the field of PV Systems in Stand-alone and Island Applications (SAPV). The book focuses on the practical experiences gained, and does not aim to provide a complete manual on SAPV. When Task III started its activities in 1993, a collection of 50 'State of the art' projects was published in the book 'Examples of Stand-Alone Photovoltaic Systems'. This publication marked the base line for the work of the task. Now, in 1998, the showcases from each country demonstrate the lessons learned in five years of cooperation. The book consists of two parts. The first part contains eight chapters dealing with a specific aspect of stand-alone PV. The second part introduces 14 national showcase projects in a systematic presentation. Each chapter and showcase can be read independently from the rest of the book. Chapter 2, contributed by The Netherlands, analyses the market for stand-alone PV systems. It gives an overview of the 'traditional' application of stand-alone PV, which is the electrification of remote buildings and which has been addressed in depth in other publications. The focus is on the market niches of service applications that are also interesting for more densely populated areas, e.g. in industrialised countries. The United Kingdom illustrates the economic aspects in Chapter 3. Cost comparisons are made, but more important is the illustration of the non-financial considerations that make PV the preferred choice as a power source for many applications. Switzerland explores in Chapter 4 (financing aspects) different financing mechanisms, and financial policies used to overcome the initial cost barrier. Most of these approaches have been applied in developing countries rather than in the western world. Using various examples from all over the

  18. Lessons learned from radiological accidents at medical exposures in radiotherapy

    International Nuclear Information System (INIS)

    Fagundes, J.S.; Ferreira, A.F.; Lima, C.M.A.; Silva, F.C.A. da

    2017-01-01

    An exposure is considered accidental in radiotherapy when there is a substantial deviation in the prescription of treatment. In this work, an analysis of published radiological accidents, both in Brazil and internationally, was performed during medical exposures in radiotherapy treatments, removing the main lessons learned. Of the research carried out, we highlight Brazil with four radiological accidents and one death in the period between 2011 and 2014; the United States of America with 169 accidents with two deaths from 2000 to 2010 and France from 2001 to 2014 had 569 deaths without patients. Lessons learned have been described, for example, that maintenance personnel training should specify limitations or restrictions on the handling or adjustment of critical parts on the accelerator. It is recommended to apply the 10 main lessons learned due to radiological accidents during medical exposures in radiotherapy treatments to avoid future events

  19. Field observations and lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Joh B [Los Alamos National Laboratory

    2010-01-01

    This presentation outlines observations and lessons learned from the Megaports program. It provides: (1) details of field and technical observations collected during LANL field activities at ports around the world and details of observations collected during radiation detections system testing at Los Alamos National Laboratory; (2) provides suggestions for improvement and efficiency; and (3) discusses possible program execution changes for more effective operations.

  20. CAT/RF Simulation Lessons Learned

    Science.gov (United States)

    2003-06-11

    IVSS-2003-MAS-7 CAT /RF Simulation Lessons Learned Christopher Mocnik Vetronics Technology Area, RDECOM TARDEC Tim Lee DCS Corporation...developed a re- configurable Unmanned Ground Vehicle (UGV) simulation for the Crew integration and Automation Test bed ( CAT ) and Robotics Follower (RF...Advanced Technology Demonstration (ATD) experiments. This simulation was developed as a component of the Embedded Simulation System (ESS) of the CAT

  1. The Gunite and Associated Tanks Remediation Project Tank Waste Retrieval Performance and Lessons Learned, vol. 2 [of 2

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, BE

    2003-10-07

    The Gunite and Associated Tanks (GAAT) Remediation Project was the first of its kind performed in the United States. Robotics and remotely operated equipment were used to successfully transfer almost 94,000 gal of remote-handled transuranic sludge containing over 81,000 Ci of radioactive contamination from nine large underground storage tanks at the Oak Ridge National Laboratory (ORNL). The sludge was transferred with over 439,000 gal of radioactive waste supernatant and {approx}420,500 gal of fresh water that was used in sluicing operations. The GAATs are located in a high-traffic area of ORNL near a main thoroughfare. Volume 1 provides information on the various phases of the project and describes the types of equipment used. Volume 1 also discusses the tank waste retrieval performance and the lessons learned during the remediation effort. Volume 2 consists of the following appendixes, which are referenced in Vol. 1: A--Background Information for the Gunite and Associated Tanks Operable Unit; B--Annotated Bibliography; C--GAAT Equipment Matrix; D--Comprehensive Listing of the Sample Analysis Data from the GAAT Remediation Project; and E--Vendor List for the GAAT Remediation Project. The remediation of the GAATs was completed {approx}5.5 years ahead of schedule and {approx}$120,435K below the cost estimated in the Remedial Investigation/Feasibility Study for the project. These schedule and cost savings were a direct result of the selection and use of state-of-the-art technologies and the dedication and drive of the engineers, technicians, managers, craft workers, and support personnel that made up the GAAT Remediation Project Team.

  2. The Gunite and Associated Tanks Remediation Project Tank Waste Retrieval Performance and Lessons Learned, vol. 2 [of 2

    International Nuclear Information System (INIS)

    Lewis, BE

    2003-01-01

    The Gunite and Associated Tanks (GAAT) Remediation Project was the first of its kind performed in the United States. Robotics and remotely operated equipment were used to successfully transfer almost 94,000 gal of remote-handled transuranic sludge containing over 81,000 Ci of radioactive contamination from nine large underground storage tanks at the Oak Ridge National Laboratory (ORNL). The sludge was transferred with over 439,000 gal of radioactive waste supernatant and ∼420,500 gal of fresh water that was used in sluicing operations. The GAATs are located in a high-traffic area of ORNL near a main thoroughfare. Volume 1 provides information on the various phases of the project and describes the types of equipment used. Volume 1 also discusses the tank waste retrieval performance and the lessons learned during the remediation effort. Volume 2 consists of the following appendixes, which are referenced in Vol. 1: A--Background Information for the Gunite and Associated Tanks Operable Unit; B--Annotated Bibliography; C--GAAT Equipment Matrix; D--Comprehensive Listing of the Sample Analysis Data from the GAAT Remediation Project; and E--Vendor List for the GAAT Remediation Project. The remediation of the GAATs was completed ∼5.5 years ahead of schedule and ∼$120,435K below the cost estimated in the Remedial Investigation/Feasibility Study for the project. These schedule and cost savings were a direct result of the selection and use of state-of-the-art technologies and the dedication and drive of the engineers, technicians, managers, craft workers, and support personnel that made up the GAAT Remediation Project Team

  3. Learning through Teaching: A Microbiology Service-Learning Experience

    Directory of Open Access Journals (Sweden)

    Ginny Webb

    2015-11-01

    Full Text Available Service learning is defined as a strategy in which students apply what they have learned in the classroom to a community service project. Many educators would agree that students often learn best through teaching others. This premise was the motivation for a new service-learning project in which undergraduate microbiology students developed and taught hands-on microbiology lessons to local elementary school children. The lessons included teaching basic information about microbes, disease transmission, antibiotics, vaccines, and methods of disease prevention. This service-learning project benefitted the college students by enforcing their knowledge of microbiology and provided them an opportunity to reach out to children within their community. This project also benefitted the local schools by teaching the younger students about microbes, infections, and handwashing. In this paper, I discuss the development and implementation of this new microbiology service-learning project, as well as the observed impact it had on everyone involved.

  4. Lean Transformation of Multinational Concerns

    DEFF Research Database (Denmark)

    Matthiesen, Rikke Vestergaard; Johansen, John

    2008-01-01

    triggered. This paper reports on exploratory studies from a multinational company adopting centrally managed pilot projects as a transformation mechanism for continuous change towards a lean business system and an organizational culture of continuous improvements (CI). Competitive pressure demands...... from a multinational company adopting centrally managed pilot projects as a transformation mechanism for continuous change towards a lean business system and an organizational culture of continuous improvements (CI)....

  5. Lessons Learned for Decommissioning Planning

    International Nuclear Information System (INIS)

    Sohn, Wook; Kim, Young-gook; Kim, Hee-keun

    2015-01-01

    The purpose of this paper is to introduce the U.S. nuclear industrial's some key lessons learned especially for decommissioning planning based on which well informed decommissioning planning can be carried out. For a successful decommissioning, it is crucial to carry out a well-organized decommissioning planning before the decommissioning starts. This paper discussed four key factors which should be decided or considered carefully during the decommissioning planning period with introduction of related decommissioning lessons learned of U.S. nuclear industry. Those factors which have been discussed in this paper include the end state of a site, the overall decommissioning strategy, the management of the spent fuels, and the spent fuel pool island. Among them, the end state of a site should be decided first as it directs the whole decommissioning processes. Then, decisions on the overall decommissioning strategy (DECON vs. SAFSTOR) and the management of the spent fuels (wet vs. dry) should follow. Finally, the spent fuel pool island should be given due consideration because its implementation will result in much cost saving. Hopefully, the results of this paper would provide useful inputs to performing the decommissioning planing for the Kori unit 1

  6. Implementing lean in surgery – lessons and implications

    DEFF Research Database (Denmark)

    Edwards, Kasper; Nielsen, Anders Paarup; Jacobsen, Peter

    2012-01-01

    The principles of lean production originating from the Toyota production system has spread from manufacturing to healthcare. Needless to say, this raises concern whether such principles are actually applicable where the product are humans in need of medical care and what are the consequences...

  7. Lesson Study-Building Communities of Learning Among Pre-Service Science Teachers

    Science.gov (United States)

    Hamzeh, Fouada

    Lesson Study is a widely used pedagogical approach that has been used for decades in its country of origin, Japan. It is a teacher-led form of professional development that involves the collaborative efforts of teachers in co-planning and observing the teaching of a lesson within a unit for evidence that the teaching practices used help the learning process (Lewis, 2002a). The purpose of this research was to investigate if Lesson Study enables pre-service teachers to improve their own teaching in the area of science inquiry-based approaches. Also explored are the self-efficacy beliefs of one group of science pre-service teachers related to their experiences in Lesson Study. The research investigated four questions: 1) Does Lesson Study influence teacher preparation for inquiry-based instruction? 2) Does Lesson Study improve teacher efficacy? 3) Does Lesson Study impact teachers' aspiration to collaborate with colleagues? 4) What are the attitudes and perceptions of pre-service teachers to the Lesson Study idea in Science? The 12 participants completed two pre- and post-study surveys: STEBI- B, Science Teaching Efficacy Belief Instrument (Enochs & Riggs, 1990) and ASTQ, Attitude towards Science Teaching. Data sources included student teaching lesson observations, lesson debriefing notes and focus group interviews. Results from the STEBI-B show that all participants measured an increase in efficacy throughout the study. This study added to the body of research on teaching learning communities, professional development programs and teacher empowerment.

  8. A community hospital's journey into Lean Six Sigma.

    Science.gov (United States)

    Stuenkel, Kurt; Faulkner, Taunya

    2009-01-01

    The implementation of Lean Six Sigma and 100-day workouts throughout the 304-bed Floyd Medical Center community hospital organization has led to sustainable results and a marked change in culture. The organization-wide learning of such an effort is deep and intehse, and to remain focused and successful it must be a priority of top management. The workout methodology can assist the organization to carry projects to completion and to achieve rapid implementation of desired improvements.

  9. Kinesthetic Astronomy: Significant Upgrades to the Sky Time Lesson that Support Student Learning

    Science.gov (United States)

    Morrow, C. A.; Zawaski, M.

    2004-12-01

    This paper will report on a significant upgrade to the first in a series of innovative, experiential lessons we call Kinesthetic Astronomy. The Sky Time lesson reconnects students with the astronomical meaning of the day, year, and seasons. Like all Kinesthetic Astronomy lessons, it teaches basic astronomical concepts through choreographed bodily movements and positions that provide educational sensory experiences. They are intended for sixth graders up through adult learners in both formal and informal educational settings. They emphasize astronomical concepts and phenomenon that people can readily encounter in their "everyday" lives such as time, seasons, and sky motions of the Sun, Moon, stars, and planets. Kinesthetic Astronomy lesson plans are fully aligned with national science education standards, both in content and instructional practice. Our lessons offer a complete learning cycle with written assessment opportunities now embedded throughout the lesson. We have substantially strengthened the written assessment options for the Sky Time lesson to help students translate their kinesthetic and visual learning into the verbal-linguistic and mathematical-logical realms of expression. Field testing with non-science undergraduates, middle school science teachers and students, Junior Girl Scouts, museum education staff, and outdoor educators has been providing evidence that Kinesthetic Astronomy techniques allow learners to achieve a good grasp of concepts that are much more difficult to learn in more conventional ways such as via textbooks or even computer animation. Field testing of the Sky Time lesson has also led us to significant changes from the previous version to support student learning. We will report on the nature of these changes.

  10. YALIN ALTI SİGMA PROJELERİ İÇİN KRİTİK BAŞARI FAKTÖRLERİ (SUCCESS FACTORS FOR LEAN SIX SIGMA PROJECTS

    Directory of Open Access Journals (Sweden)

    Ali Rıza FİRUZAN

    2012-10-01

    Full Text Available Nowadays many companies focus on various kinds of quality improvement techniques to carry the service quality beyond costumer expectations. The selected quality technique should be appropriate to the company's culture and should be sufficient for carry out targeted improvement; this will enhance the company’s superiority in market place.For this purpose, Lean Six Sigma methods are one of the important methods being used today as an intensive use of statistical tools and techniques. Lean Six Sigma methods can be implemented in almost all sectors and successful gains can be obtained. Lean Six Sigma has wide range application in the world. Most applications are successful, while some of them are failed. In this study, reasons for unsuccessful Lean Six Sigma projects are examined. The way to convert unsuccessful project into successful project are suggested. Some solutions are carried out for this purpose.

  11. Lessons learned on the Ground Test Accelerator control system

    International Nuclear Information System (INIS)

    Kozubal, A.J.; Weiss, R.E.

    1994-01-01

    When we initiated the control system design for the Ground Test Accelerator (GTA), we envisioned a system that would be flexible enough to handle the changing requirements of an experimental project. This control system would use a developers' toolkit to reduce the cost and time to develop applications for GTA, and through the use of open standards, the system would accommodate unforeseen requirements as they arose. Furthermore, we would attempt to demonstrate on GTA a level of automation far beyond that achieved by existing accelerator control systems. How well did we achieve these goals? What were the stumbling blocks to deploying the control system, and what assumptions did we make about requirements that turned out to be incorrect? In this paper we look at the process of developing a control system that evolved into what is now the ''Experimental Physics and Industrial Control System'' (EPICS). Also, we assess the impact of this system on the GTA project, as well as the impact of GTA on EPICS. The lessons learned on GTA will be valuable for future projects

  12. PUREX/UO3 facilities deactivation lessons learned history

    International Nuclear Information System (INIS)

    Hamrick, D.G.; Gerber, M.S.

    1995-01-01

    The Plutonium-Uranium Extraction (PUREX) Facility operated from 1956-1972, from 1983-1988, and briefly during 1989-1990 to produce for national defense at the Hanford Site in Washington State. The Uranium Trioxide (UO 3 ) Facility operated at the Hanford Site from 1952-1972, 1984-1988, and briefly in 1993. Both plants were ordered to permanent shutdown by the U.S. Department of Energy (DOE) in December 1992, thus initiating their deactivation phase. Deactivation is that portion of a facility's life cycle that occurs between operations and final decontamination and decommissioning (D ampersand D). This document details the history of events, and the lessons learned, from the time of the PUREX Stabilization Campaign in 1989-1990, through the end of the first full fiscal year (FY) of the deactivation project (September 30, 1994)

  13. The roles of lesson study in the development of mathematics learning instrument based on learning trajectory

    Science.gov (United States)

    Misnasanti; Dien, C. A.; Azizah, F.

    2018-03-01

    This study is aimed to describe Lesson Study (LS) activity and its roles in the development of mathematics learning instruments based on Learning Trajectory (LT). This study is a narrative study of teacher’s experiences in joining LS activity. Data collecting in this study will use three methods such as observation, documentations, and deep interview. The collected data will be analyzed with Milles and Huberman’s model that consists of reduction, display, and verification. The study result shows that through LS activity, teachers know more about how students think. Teachers also can revise their mathematics learning instrument in the form of lesson plan. It means that LS activity is important to make a better learning instruments and focus on how student learn not on how teacher teach.

  14. Lean leadership: an ethnographic study.

    Science.gov (United States)

    Aij, Kjeld Harald; Visse, Merel; Widdershoven, Guy A M

    2015-01-01

    The purpose of this study is to provide a critical analysis of contemporary Lean leadership in the context of a healthcare practice. The Lean leadership model supports professionals with a leading role in implementing Lean. This article presents a case study focusing specifically on leadership behaviours and issues that were experienced, observed and reported in a Dutch university medical centre. This ethnographic case study provides auto-ethnographic accounts based on experiences, participant observation, interviews and document analysis. Characteristics of Lean leadership were identified to establish an understanding of how to achieve successful Lean transformation. This study emphasizes the importance for Lean leaders to go to the gemba, to see the situation for one's own self, empower health-care employees and be modest. All of these are critical attributes in defining the Lean leadership mindset. In this case study, Lean leadership is specifically related to healthcare, but certain common leadership characteristics are relevant across all fields. This article shows the value of an auto-ethnographic view on management learning for the analysis of Lean leadership. The knowledge acquired through this research is based on the first author's experiences in fulfilling his role as a health-care leader. This may help the reader examining his/her own role and reflecting on what matters most in the field of Lean leadership.

  15. Primary problems associated with the health and welfare of employees observed when implementing lean manufacturing projects.

    Science.gov (United States)

    Rampasso, Izabela Simon; Anholon, Rosley; Gonçalves Quelhas, Osvaldo Luiz; Filho, Walter Leal

    2017-01-01

    Lean philosophy is used by companies to increase productivity and reduce costs. Although uncontested benefits are created, it is necessary to highlight the problems related to employees' health and welfare caused by implementing lean manufacturing projects. The primary objective of this paper is to review the literature and identify the most relevant problems created by lean philosophy for employees. Research about the theme was performed on many international databases over three months, and an initial sample of 77 papers was found. Twenty-seven sources were utilized. We identified 22 categories of problems related to health and welfare of employees. The most cited problem was work intensification, mentioned by thirteen papers. Increased stress and increased responsibilities, demands and, consequently, pressure on the workers are among the primary problems observed in the research.

  16. Lean Transformation Guidance: Why Organizations Fail To Achieve and Sustain Excellence Through Lean Improvement

    OpenAIRE

    Mohammed Hamed Ahmed

    2013-01-01

    Many companies are complaining that lean didn’t achieve their long-term goals, and the improvement impact was very short-lived. 7 out of each 10 lean projects fail as companies try to use lean like a toolkit, copying and pasting the techniques without trying to adapt the employee’s culture, manage the improvement process, sustain the results, and develop their leaders. When the Toyota production system was created, the main goal was to remove wastes from the shop floor us...

  17. LEAN-GREEN MANUFACTURING: COLLABORATIVE CONTENT AND LANGUAGE INTEGRATED LEARNING IN HIGHER EDUCATION AND ENGINEERING COURSES

    Directory of Open Access Journals (Sweden)

    MARCELO RUDOLFO CALVETE GASPAR

    2017-09-01

    Full Text Available Lean and Green manufacturing processes aim at achieving lower material and labour costs, while reducing impacts on the environment, and promoting sustainability as a whole. This paper reports on a pilot experiment with higher education and engineering students, exploring the full potential of a collaborative approach on courses integrating the Portuguese Polytechnic of Castelo Branco engineering studies curricula, while simultaneously improving their proficiency in English. Content and Language Integrated Learning (CLIL has become a key area of curricular innovation since it is known for improving both language and content teacher and student motivation. In this context, instructional design for CLIL entailed tandem work of content (engineering and language (English teacher to design learning sequences and strategies. This allowed students to improve not only their language skills in English but also their knowledge in the specific engineering domain content on green and lean manufacturing processes.

  18. Sellafield Decommissioning Programme - Update and Lessons Learned

    International Nuclear Information System (INIS)

    Lutwyche, P. R.; Challinor, S. F.

    2003-01-01

    The Sellafield site in North West England has over 240 active facilities covering the full nuclear cycle from fuel manufacture through generation, reprocessing and waste treatment. The Sellafield decommissioning programme was formally initiated in the mid 1980s though several plants had been decommissioned prior to this primarily to create space for other plants. Since the initiation of the programme 7 plants have been completely decommissioned, significant progress has been made in a further 16 and a total of 56 major project phases have been completed. This programme update will explain the decommissioning arrangements and strategies and illustrate the progress made on a number of the plants including the Windscale Pile Chimneys, the first reprocessing plan and plutonium plants. These present a range of different challenges and requiring approaches from fully hands on to fully remote. Some of the key lessons learned will be highlighted

  19. State Support for Clean Energy Deployment. Lessons Learned for Potential Future Policy

    Energy Technology Data Exchange (ETDEWEB)

    Kubert, Charles [Clean Energy States Alliance, Montpelier, VT (United States); Sinclair, Mark [Clean Energy States Alliance, Montpelier, VT (United States)

    2011-04-01

    Proposed federal clean energy initiatives and climate legislation have suggested significant increases to federal funding for clean energy deployment and investment. Many states and utilities have over a decade of experience and spend billions of public dollars every year to support EE/RE deployment through programs that reduce the cost of technologies, provide financing for EE/RE projects, offer technical assistance, and educate market participants. Meanwhile, constraints on public expenditures at all levels of government continue to call upon such programs to demonstrate their value. This report reviews the results of these programs and the specific financial incentives and financing tools used to encourage clean energy investment. Lessons from such programs could be used to inform the future application of EE/RE incentives and financing tools. These lessons learned apply to use of distributed resources and the historical focus of these EE/RE programs.

  20. State Support for Clean Energy Deployment: Lessons Learned for Potential Future Policy

    Energy Technology Data Exchange (ETDEWEB)

    Kubert, C.; Sinclair, M.

    2011-04-01

    Proposed federal clean energy initiatives and climate legislation have suggested significant increases to federal funding for clean energy deployment and investment. Many states and utilities have over a decade of experience and spend billions of public dollars every year to support EE/RE deployment through programs that reduce the cost of technologies, provide financing for EE/RE projects, offer technical assistance, and educate market participants. Meanwhile, constraints on public expenditures at all levels of government continue to call upon such programs to demonstrate their value. This report reviews the results of these programs and the specific financial incentives and financing tools used to encourage clean energy investment. Lessons from such programs could be used to inform the future application of EE/RE incentives and financing tools. These lessons learned apply to use of distributed resources and the historical focus of these EE/RE programs.

  1. Using Dynamic Value Stream Mapping and Lean Accounting Box Scores to Support Lean Implementation

    Science.gov (United States)

    Woehrle, Stephen L.; Abou-Shady, Louay

    2010-01-01

    Lean has proven to be an effective management philosophy for improving businesses in a competitive market by eliminating waste and improving operations. An impact of implementing lean projects is the rapid reduction in inventory levels, which gives management the false impression that profits are decreasing while workers on the shop floor observe…

  2. The Joint Lessons Learned System and Interoperability

    Science.gov (United States)

    1989-06-02

    Learned: 1988-1989 As mentioned in the introduction to this chaoter, the Organizacion of the JcinC Chiefs cf Staff .OJCS) ueren significant transformatioi...Organization and Functions Manual . Washington, D.C.: HQDA, Office of the Deputy Chief 0f Staff for Operations and Plans, June 1984. ’..S. Army. Concept...U.S. Department of Defense. Joint Universal Lessons Learned System (JULLS) User’s Manual . Orlando, Florida: University of Central Florida, Institute

  3. SRS SLUDGE BATCH QUALIFICATION AND PROCESSING; HISTORICAL PERSPECTIVE AND LESSONS LEARNED

    Energy Technology Data Exchange (ETDEWEB)

    Cercy, M.; Peeler, D.; Stone, M.

    2013-09-25

    This report provides a historical overview and lessons learned associated with the SRS sludge batch (SB) qualification and processing programs. The report covers the framework of the requirements for waste form acceptance, the DWPF Glass Product Control Program (GPCP), waste feed acceptance, examples of how the program complies with the specifications, an overview of the Startup Program, and a summary of continuous improvements and lessons learned. The report includes a bibliography of previous reports and briefings on the topic.

  4. Project RAILS: Lessons Learned about Rubric Assessment of Information Literacy Skills

    Science.gov (United States)

    Belanger, Jackie; Zou, Ning; Mills, Jenny Rushing; Holmes, Claire; Oakleaf, Megan

    2015-01-01

    Rubric assessment of information literacy is an important tool for librarians seeking to show evidence of student learning. The authors, who collaborated on the Rubric Assessment of Informational Literacy Skills (RAILS) research project, draw from their shared experience to present practical recommendations for implementing rubric assessment in a…

  5. Lean maturity, lean sustainability

    DEFF Research Database (Denmark)

    Jørgensen, Frances; Matthiesen, Rikke; Nielsen, Jacob

    2007-01-01

    . A framework for describing levels of lean capability is presented, based on a brief review of the literature and experiences from 12 Danish companies currently implementing lean. Although still in its emerging phase, the framework contributes to both theory and practice by describing developmental stages......Although lean is rapidly growing in popularity, its implementation is far from problem free and companies may experience difficulties sustaining long term success. In this paper, it is suggested that sustainable lean requires attention to both performance improvement and capability development...... that support lean capability development and consequently, lean sustainability....

  6. Best intentions: Lessons learned on international partnering and alliance contracts

    International Nuclear Information System (INIS)

    Farrell, S.; McDermott, J.R.; Ramsay, A.; Watzke, J.

    1996-01-01

    Although the energy industry is still in the early stages of partnering and alliancing, there is enough accumulated experience to be worth sharing information on what has worked and what has not. This paper explores the lessons learned in six agreements in the UK, the US, and the Middle East. It concludes that not all projects are potential candidates for partnering or alliances. Those likely to be successful will contain common characteristics of complexity, uncertainty, technology and duration. Management structure is moving towards integrated teams, although projects currently fall along a broad spectrum before becoming truly integrated. The risk/reward structure is becoming more complex over time, although it is unclear that tinkering with percentage sharing schemes will actually change the behavior of project participants and result in additional cost savings. The use of team building techniques and facilitators may well enhance the alliance implementation, but the choice of both company and individual members is fundamental to success. The overriding success factor, however, is the setting of fair and achievable targets. All of the managers surveyed stated that their projects benefited from the use of a partnering or alliance structure. Three of the projects were far enough along to cite significant cost savings. Although some in the industry are still doubtful that alliances can make a true difference to a project's outcome, those who have participated are convinced they have achieved results which would have been unattainable in a traditional structure. They would add, however, that partnering and alliancing is not easy, and not for all projects. The industry must share practical information if significant learning is to occur

  7. Packages of participation: Swedish employees' experience of Lean depends on how they are involved.

    Science.gov (United States)

    Brännmark, Mikael; Holden, Richard J

    2013-01-01

    Lean Production is a dominant approach in Swedish and global manufacturing and service industries. Studies of Lean's employee effects are few and contradictory. Employee effects from Lean are likely not uniform. This paper investigates the effect of employees' participation on their experiences of Lean. This study investigated how different packages of employee participation in Lean affected manufacturing workers' experiences of Lean. During 2008-2011, qualitative and quantitative data were collected from Swedish manufacturing companies participating in the national Swedish Lean Production program Produktionslyftet. Data from 129 surveys (28 companies), 39 semi-structured interviews, and 30 reports were analyzed. In the main analysis, comparisons were made of the survey-reported Lean experiences of employees in three groups: temporary group employees (N = 36), who participated in Lean mostly through intermittent projects; continuous group employees (N = 69), who participated through standing improvement groups; and combined group employees (N = 24), who participated in both ways. Continuous group employees had the most positive experience of Lean, followed by the combined group. Temporary group employees had the least positive experiences, being less likely than their counterparts to report that Lean improved teamwork, occupational safety, and change-related learning, decision making, and authority. These findings support the importance of continuous, structured opportunities for participation but raise the possibility that more participation may result in greater workload and role overload, mitigating some benefits of employee involvement. Consequently, companies should consider involving employees in change efforts but should attend to the specific design of participation activities.

  8. Surviving the Lead Reliability Engineer Role in High Unit Value Projects

    Science.gov (United States)

    Perez, Reinaldo J.

    2011-01-01

    A project with a very high unit value within a company is defined as a project where a) the project constitutes one of a kind (or two-of-a-kind) national asset type of project, b) very large cost, and c) a mission failure would be a very public event that will hurt the company's image. The Lead Reliability engineer in a high visibility project is by default involved in all phases of the project, from conceptual design to manufacture and testing. This paper explores a series of lessons learned, over a period of ten years of practical industrial experience by a Lead Reliability Engineer. We expand on the concepts outlined by these lessons learned via examples. The lessons learned are applicable to all industries.

  9. Lean and the Learning Organization in Higher Education

    Science.gov (United States)

    Francis, David E.

    2014-01-01

    Canadian post-secondary institutions are seeking enhanced efficiencies due to ongoing funding shortfalls and expanding teaching, research, and service mandates. These institutions have considered or enacted Lean methodology based on results reported by public service and healthcare organizations worldwide. Lean requires a high level of…

  10. Lessons learned -- NREL Village Power Program

    Energy Technology Data Exchange (ETDEWEB)

    Flowers, L.

    1998-07-01

    In 1993, a workshop was convened at the National Renewable Energy Laboratory (NREL) to discuss the issues of applying renewable energy in a sustainable manner to international rural development. One of the summary recommendations was that NREL could assist in the renewable energy for rural electrification effort by developing and supplying six related activities: resource assessment, comparative analysis and modeling, performance monitoring and analysis, pilot project development, internet-based project data, communications, and training. In response to this recommendation, NREL launched its Village Power Program consisting of these activities that cut across NREL technologies and disciplines. Currently NREL is active in 20 countries, with pilot projects in 12 of those countries. At this time the technologies include photovoltaics, wind, biomass, and hybrids. The rural applications include home lighting and communications, water pumping, schools and health posts, battery charging stations, ecotourism, and village systems. These pilot projects are central to the renewable energy village power development through the demonstration of three aspects critical to replication and implementation of the projects on a significant scale. The three aspects are technical functionality, economic competitiveness, and institutional sustainability. It is important to note that the pilot projects from which NREL's experience has been gained were funded and, in many cases, developed by other organizations and agencies. NREL's role has been one of technical assistance or project management or both. The purpose of this paper is to describe the lessons NREL staff has gleaned from their participation in the various pilot projects. The author hopes that these lessons will help the Renewable Energy-Based Rural Electrification (RERE) community in implementing sustainable projects that lead to replication.

  11. MODIS Science Algorithms and Data Systems Lessons Learned

    Science.gov (United States)

    Wolfe, Robert E.; Ridgway, Bill L.; Patt, Fred S.; Masuoka, Edward J.

    2009-01-01

    For almost 10 years, standard global products from NASA's Earth Observing System s (EOS) two Moderate Resolution Imaging Spectroradiometer (MODIS) sensors are being used world-wide for earth science research and applications. This paper discusses the lessons learned in developing the science algorithms and the data systems needed to produce these high quality data products for the earth sciences community. Strong science team leadership and communication, an evolvable and scalable data system, and central coordination of QA and validation activities enabled the data system to grow by two orders of magnitude from the initial at-launch system to the current system able to reprocess data from both the Terra and Aqua missions in less than a year. Many of the lessons learned from MODIS are already being applied to follow-on missions.

  12. Economics of forest and forest carbon projects. Translating lessons learned into national REDD+ implementation

    Energy Technology Data Exchange (ETDEWEB)

    Zaballa Romero, M.; Traerup, S.; Wieben, E.; Ravnkilde Moeller, L.; Koch, A.

    2013-01-15

    The financial implications of implementing a new forest management paradigm have not been well understood and have often been underestimated. Resource needs for e.g., stakeholder consultation, capacity building and addressing the political economy are seldom fully accounted for in the resource needs estimates put forward in connection to REDD+. This report investigates the economics of implementing forest and REDD+ projects through eight case studies from Africa, Latin America and Asia, analyzing real forest and REDD+ investments. The report is part of efforts to share financial experiences and lessons learned with policymakers, project developers and stakeholders, with the objective to inform forest project and strategy development. It presents experiences and advice on the risks, costs and revenues of forest projects, thereby informing not only the development of future REDD+ initiatives but also the testing of advanced market commitments as a finance option for sustainable forest management. The findings in the report underline the fact that only through sound and transparent financial information will forest projects and national forest initiatives become interesting for private financial institutions and comparable with other investment opportunities. It is therefore important to include robust analysis of the operations business case and its financial attractiveness to commercial investors, early in the design process. As for the economics of forest and forest carbon projects, it appears that REDD+ payments alone, especially at current prices, will not deliver the revenues that cover all expenses of transparent and long-term mitigation of forest carbon emissions. Instead the findings underline the importance of building up forest operations which effectively manages risk and delivers several revenue streams. These findings are aligned with the advocacy efforts of UNEP and the UN-REDD Programme on multiple benefits and the combination of various funding and

  13. Sustaining Community-University Partnerships: Lessons learned from a participatory research project with elderly Chinese

    Directory of Open Access Journals (Sweden)

    XinQi Dong

    2011-11-01

    Full Text Available The strength of community-engaged research has been well documented in public health literature. It is recognised as a useful approach for eliminating health disparities by linking research and practice. While the framework of community-engaged research encompasses a broad range of research collaborations, community-based participatory research (CBPR places most emphasis on involving the community as a full, equitable partner throughout the collaboration. Despite growing interest in and demand for community-university partnerships, less attention is given to the issue of partnership sustainability. The purpose of this article is to present the challenges faced in sustaining a community-university partnership when conducting a CBPR project with an elderly Chinese population in Chicago’s Chinatown. Lessons and strategies learned from the cultural and linguistic complexities of the Chinese community are also detailed. In addition, based on a well-accepted sustainability conceptual framework, we reflect on the initial stage, mid-term actions and long-term goals of developing partnership sustainability. Working with the Chinese community required trust and respect for its unique cultural values and diversity. The cultural, social and environmental contexts within which the partnership operated served as critical forces for long-term sustainability: a culturally sensitive approach is instrumental in sustaining community-university partnership. Also discussed are the significant implications for evidence-based, impact-driven partnerships to develop culturally appropriate strategies to meet the needs of diverse populations. Keywords Community-based participatory research, community health partnerships, health promotion, Chinese Americans, ageing

  14. Two Approaches to Distance Education: Lessons Learned.

    Science.gov (United States)

    Sedlak, Robert A.; Cartwright, G. Phillip

    1997-01-01

    Outlines lessons learned by the University of Wisconsin-Stout in implementing two distance education programs, a technology program using interactive television and a hospitality program using Lotus Notes to deliver courses. Topics discussed include program concept vs. technology as stimulus for innovation, program planning/administration,…

  15. Lean sigma--will it work for healthcare?

    Science.gov (United States)

    Bahensky, James A; Roe, Janet; Bolton, Romy

    2005-01-01

    The manufacturing industry has been using Lean Sigma for years in pursuit of continuous improvement to obtain a competitive advantage. The objectives of these efforts are to use the Lean techniques for reducing cycle times and the Six Sigma concepts for reducing product defects. The Iowa Business Council with several advocates worked with the University of Iowa Hospital and Clinics (UIHC) and two other Iowa hospitals to determine whether Lean Sigma is adaptable in healthcare. A team of 15 people at UIHC used the Kaizen Breakthrough Methodology over a five-day period in an aggressive identification and elimination of non-value added activities in Radiology CT scanning. The results exceeded the initial project objectives and indicated that Lean Sigma is applicable in healthcare. Overall, the Lean Sigma project increased revenue by approximately $750,000 per year. The Kaizen process proved to be successful and interesting. Within three days, the team installed new work flow processes. This implementation-oriented approach is what differentiates Lean Sigma from other quality improvement processes.

  16. International R&M/Safety Cooperation Lessons Learned Between NASA and JAXA

    Science.gov (United States)

    Fernandez, Rene; Havenhill, Maria T.; Zampino, Edward J.; Kiefer, Dwayne E.

    2013-01-01

    Presented are a number of important experiences gained and lessons learned from the collaboration of the National Aeronautics and Space Administration (NASA) and the Japanese Aerospace Exploration Agency (JAXA) on the CoNNeCT (Communications, Navigation, and Networking re-Configurable Testbed) project. Both space agencies worked on the CoNNeCT Project to design, assemble, test, integrate, and launch a communications testbed facility mounted onto the International Space Station (ISS) truss. At the 2012 RAMS, two papers about CoNNeCT were presented: one on Ground Support Equipment Reliability & System Safety, and the other one on combined application of System Safety & Reliability for the flight system. In addition to the logistics challenges present when two organizations are on the opposite side of the world, there is also a language barrier. The language barrier encompasses not only the different alphabet, it encompasses the social interactions; these were addressed by techniques presented in the paper. The differences in interpretation and application of Spaceflight Requirements will be discussed in this paper. Although many, but definitely not all, of JAXA's Spaceflight Requirements were inspired by NASA, there were significant and critically important differences in how they were interpreted and applied. This paper intends to summarize which practices worked and which did not for an international collaborative effort so that future missions may benefit from our experiences. The CoNNeCT flight system has been successfully assembled, integrated, tested, shipped, launched and installed on the ISS without incident. This demonstrates that the steps taken to facilitate international understanding, communication, and coordination were successful and warrant discussion as lessons learned.

  17. Project Choice: Lessons Learned.

    Science.gov (United States)

    Ewing Marion Kauffman Foundation, Kansas City, MO.

    Project Choice began with a simple goal: to increase the number of inner-city students who graduate from high school on time and become productive members of society. To that end, Ewing M. Kauffman, his Foundation, and associates designed and implemented a program that promised postsecondary education or training to some students in the Kansas…

  18. Lessons-Learned from an Event during Overhaul

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jitae [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2013-05-15

    The event frequency, also including portion of human errors, has been decreasing compared to last ten years. However, events due to human errors during overhaul occur every year. From analyzed results for human-related events during overhaul, similar problems were identified. And organizational and safety cultural factors were also identified. On the other hand, another event during overhaul is analyzed and Lessons-Learned is drawn in an aspect of the operators' situation awareness. There was an event during overhaul and the analyzed results drawn Lessons-Learned in the aspect of the operators' situation awareness. From the analysis, several alarms and variation of plant parameters during overhaul can occur due to various maintenance works and tests. And in the aspect of the situation awareness, operators can miss, neglect, or not recognize the abnormal situation due to other maintenance activities occurring simultaneously. Therefore, countermeasures such as operator education or training, development of operator support systems, and further researches should be necessary to cope with these problems.

  19. Lessons-Learned from an Event during Overhaul

    International Nuclear Information System (INIS)

    Kim, Jitae

    2013-01-01

    The event frequency, also including portion of human errors, has been decreasing compared to last ten years. However, events due to human errors during overhaul occur every year. From analyzed results for human-related events during overhaul, similar problems were identified. And organizational and safety cultural factors were also identified. On the other hand, another event during overhaul is analyzed and Lessons-Learned is drawn in an aspect of the operators' situation awareness. There was an event during overhaul and the analyzed results drawn Lessons-Learned in the aspect of the operators' situation awareness. From the analysis, several alarms and variation of plant parameters during overhaul can occur due to various maintenance works and tests. And in the aspect of the situation awareness, operators can miss, neglect, or not recognize the abnormal situation due to other maintenance activities occurring simultaneously. Therefore, countermeasures such as operator education or training, development of operator support systems, and further researches should be necessary to cope with these problems

  20. Implementing and measuring safety goals and safety culture. 2. Extensive Efforts to Learn Lessons from Overseas Nuclear Power Plants

    International Nuclear Information System (INIS)

    Maki, Nobuo

    2001-01-01

    1992. The missions of INSS are to raise the safety and reliability level of NPPs and to achieve harmony with society and the environment in the areas of technology, human engineering, and social science. For these missions, INSS is conducting research from a broad perspective, developing policies, and offering guidance to Japanese utilities. The research results are published to contribute to the growth and development of nuclear power generation. INSS consists of two institutes: the Institute of Social Research and the Institute of Nuclear Technology. The Institute of Social Research has three projects: the Human Factor Research project, Social Awareness Research project, and Energy Issue Research project. The Institute of Nuclear Technology has four projects: the Nuclear Power Information project, Abnormal Occurrence Prevention project, Material Aging project, and Technical Support project. The Nuclear Power Information project has an important role to provide Japanese utilities with lessons learned on NPP safety. Event reports from INPO, WANO, and the U.S. Nuclear Regulatory Commission are analyzed by the project. The event information and the analyzed results are accumulated in Nuclear Information Database. The number of the events stored in the database over the past 6 yr is more than 22 000. Recently, the database has been improved to offer a Web-based interface. In the evaluation of gas accumulation in safety injection system piping of pressurized water reactors (PWRs) performed by the project, it was clarified that gas accumulation in piping between the safety injection tank and residual heat removal system should be quantitatively investigated regarding Japanese PWRs. The cause of the event is coolant leakage to the interfacing system with lower pressure and gas dissolution of primary coolant by the pressure drop. The gas inspection method using UT was demonstrated at MTC and planned to be applied to actual KEPCO plants. INSS is providing Japanese utilities

  1. Shared Learning and the Drive to Improve Patient Safety: Lessons Learned from the Pittsburgh Regional Healthcare Initiative

    National Research Council Canada - National Science Library

    Sirio, Carl A; Keyser, Donna J; Norman, Heidi; Weber, Robert J; Muto, Carlene A

    2005-01-01

    Based on lessons learned through implementation of the Pittsburgh Regional Healthcare Initiative's region-wide shared learning model, we have identified the environmental, cultural, and infrastructure...

  2. Lessons Learned from Developing SAWA: A Situation Awareness Assistant

    National Research Council Canada - National Science Library

    Matheus, Christopher J; Kokar, Mieczyslaw M; Letkowski, Jerzy J; Call, Catherine; Baclawski, Kenneth; Hinman, Michael; Salerno, John; Boulware, Douglas

    2005-01-01

    .... During the process of its development several lessons were learned about advantages and limitations of certain approaches, techniques and technologies as they are applied to situation awareness...

  3. Disturbing Practices: Training Workers to Be Lean

    Science.gov (United States)

    Yasukawa, Keiko; Brown, Tony; Black, Stephen

    2014-01-01

    Purpose: The purpose of this paper is to explore the possibilities for expansive learning during organisational change. It considers the introduction of "lean production" as a disturbance to the existing work practices. Design/methodology/approach: The paper considers two case studies of "lean production" training with…

  4. Learning lean with lego: developing and evaluating the efficacy of a serious game

    Directory of Open Access Journals (Sweden)

    Fabiano Leal

    Full Text Available Abstract This study presents the use of a serious game developed to teach Lean philosophy. The structure of this game was built from theoretical elements and predefined learning events. Learning outcomes and student motivation were considered in the evaluation of the efficacy of the game. This serious game was applied to four groups of students with different profiles. The evaluation results were compared among these groups of students. It can be concluded that the serious game developed showed positive results in learning and motivation demonstrated by the students, regardless of the group analyzed. The main contributions to the literature presented in this article were the serious game (named 3L that was developed and the efficacy evaluation method, considering the learning and motivation demonstrated in different profiles of students.

  5. Automated vehicle identification tags in San Antonio : lessons learned from the metropolitan model deployment initiative : unique method for collecting arterial travel speed information

    Science.gov (United States)

    2000-10-01

    This report demonstrates a unique solution to the challenge of providing accurate, timely estimates of arterial travel times to the motoring public. In particular, it discusses the lessons learned in deploying the Vehicle Tag Project in San Antonio, ...

  6. Lessons learned from the non-proliferation experiment

    Energy Technology Data Exchange (ETDEWEB)

    McWilliam, C.; Curtis, S. [DOE, Las Vegas, NV (United States)

    1994-12-31

    The Department of Energy sponsored Non-Proliferation Experiment (formerly known as the Chemical Kiloton) involved the detonation of blasting agent approximately equivalent to one kiloton of energy release on the Nevada Test Site in an effort to determine if (and if so, which) discriminators exist between conventional and nuclear detonations of similar yield. Coordination among hundreds of scientists from at least fifteen different organizations were required to design the experiments necessary to collect and interpret data from this unique and complex event. Stakeholders and members of the Group of Scientific Experts of the Conference on Disarmament observed the progress of the experiment first hand. The experiment was a success in that a vast majority of the expected data was collected and shared quickly and efficiently throughout the international scientific community. The management of the project was discussed among the major co-sponsoring organizations and the significant {open_quotes}lessons learned{close_quotes} are presented.

  7. Refueling Infrastructure for Alternative Fuel Vehicles: Lessons Learned for Hydrogen; Workshop Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    Melaina, M. W.; McQueen, S.; Brinch, J.

    2008-07-01

    DOE sponsored the Refueling Infrastructure for Alternative Fuel Vehicles: Lessons Learned for Hydrogen workshop to understand how lessons from past experiences can inform future efforts to commercialize hydrogen vehicles. This report contains the proceedings from the workshop.

  8. The Rewards of Research at an Undergraduate Institution and Lessons Learned in Building Detector Systems that Work

    Science.gov (United States)

    Isenhower, Donald

    2015-04-01

    This talk addresses primary lessons learned during 28 years of work leading to the awarding of this prize for work on designing, building and operating detectors, with most of the work involving over 150 undergraduates during this time period. There are a wide range of skills and knowledge to be learned if a young scientist is interested in following this career route, so the most important subset of these will be described. Part will be how to involve undergraduate students at their fullest potential, and important differences of ACU from many programs, which has led to collaborators to make inquiries as to when will the ``ACU Army'' arrive so that they can time when their detector components will be shipped to the experiments for the testing and setup to be handed over to these students. The size of the detectors constructed have varied from small hodoscopes to the world's largest active cathode strip chambers. The science knowledge needed for detector construction is extremely multidisciplinary, and this must be learned by the professor directing the work as they will not have an engineering or support staff to lean on usually. This will include fields often considered unimportant to physics; however, ignorance of them can lead to failure. Knowing the primary question to ask will show where a significant area of concern will lie in what is being done by a person, group or company on a subsystem for a detector. Textbook descriptions of detectors, electronics, and materials can lead young experimenters astray. It has been learning the correct, fundamental physical processes that determine actual detector performance that has allowed the awardee to make his most important contributions over many years of research. A final lesson to be described will be how to make your undergraduate research program self-sustaining, so that critical knowledge is not lost as students graduate. Research supported in part by grants from the U.S. DOE Office of Science, the NSF, and

  9. STEM-related, Student-led Service Learning / Community Engagement Projects: Examples and Benefits

    Science.gov (United States)

    Swap, R. J.; Wayland, K.

    2015-12-01

    Field-based, STEM-related service learning / community engagement projects present an opportunity for undergraduate students to demonstrate proficiencies related to the process of inquiry. These proficiencies include: appreciation of the larger project context, articulation of an informed question/hypothesis, project proposal development, interdisciplinary collaboration, project management (including planning, implementation reconfiguration and synthesis) and lastly the generation and handing off of acquired knowledge. Calls for these types of proficiencies have been expressed by governmental, non-governmental as well as the private sector. Accordingly, institutions of higher learning have viewed such activities as opportunities for enriching the learning experience for undergraduate students and for making such students more marketable, especially those from STEM-related fields. This institutional interest has provided an opportunity to support and expand field-based learning. Here we present examples of student-led/faculty-mentored international service learning and community engagement projects along the arc of preparation, implementation and post-field process. Representative examples that draw upon environmental science and engineering knowledge have been selected from more than 20 international undergraduate student projects over past decade and include: slow-sand water filtration, rainwater harvesting, methane biodigesters, water reticulation schemes and development and implementation of rocket stoves for communal cooking. We discuss these efforts in terms of the development of the aforementioned proficiencies, the utility of such proficiencies to the larger enterprise of STEM and the potential for transformative student learning outcomes. We share these experiences and lessons learned with the hope that others may intelligently borrow from our approach in a manner appropriate for their particular context.

  10. From the Games Industry: Ten Lessons for Game-Based Learning

    Science.gov (United States)

    Hollins, Paul; Whitton, Nicola

    2011-01-01

    This paper draws on lessons learned from the development process of the entertainment games industry and discusses how they can be applied to the field of game-based learning. This paper examines policy makers and those wishing to commission or develop games for learning and highlights potential opportunities as well as pitfalls. The paper focuses…

  11. SEL/Project Language. Level II, Kindergarten, Volume II (Lessons 17-32).

    Science.gov (United States)

    Valladares, Ann E.; And Others

    This curriculum guide contains the Southeastern Education Laboratory/Project Language Lessons 17-32 stressing listening, speaking, and reading readiness for disadvantaged kindergarten children. The lessons are designed to be used in the SEL's mobile preschool units or as readiness materials for kindergarten. The major emphasis of this intervention…

  12. Lessons learned from accidents in radiotherapy

    Energy Technology Data Exchange (ETDEWEB)

    Ortiz-Lopez, P [International Atomic Energy Agency, Vienna (Austria). Div. of Nuclear Safety; Novotny, J [University Hospital St. Rafael, Leuven (Belgium); Haywood, J [South Cleveland Hospital (United Kingdom). Cleveland Medical Physics Unit

    1996-08-01

    Radiotherapy is the only application of radiation which intentionally delivers very high doses to humans. A gross deviation from the prescribed dose or dose distribution can have severe, or even fatal consequences. Since the patient is placed directly in the beam or sources are inserted in the body, any mistake made with the beam or the sources leads almost certainly to an accidental exposure. Lessons learned from previous incidents can be used to test the vulnerability of a given facility, provided that these are adequately disseminated. The purpose of this paper is to present a summary of the lessons learned from a relatively large sample of events. The analysis has been presented as a short description followed by an identification of the triggering event and the contributing factors. These have been grouped as follows: errors in commissioning or calibration machines and sources affecting many patients; mistakes affecting individual patients such as irradiating the wrong patient, the wrong, field or site, and mistakes when entering data into or reading from the patient`s chart; error due to unusual treatments or situations; equipment failure and human machine problems, including maintenance. (author). 1 ref.

  13. Lessons learned from accidents in radiotherapy

    International Nuclear Information System (INIS)

    Ortiz-Lopez, P.; Haywood, J.

    1996-01-01

    Radiotherapy is the only application of radiation which intentionally delivers very high doses to humans. A gross deviation from the prescribed dose or dose distribution can have severe, or even fatal consequences. Since the patient is placed directly in the beam or sources are inserted in the body, any mistake made with the beam or the sources leads almost certainly to an accidental exposure. Lessons learned from previous incidents can be used to test the vulnerability of a given facility, provided that these are adequately disseminated. The purpose of this paper is to present a summary of the lessons learned from a relatively large sample of events. The analysis has been presented as a short description followed by an identification of the triggering event and the contributing factors. These have been grouped as follows: errors in commissioning or calibration machines and sources affecting many patients; mistakes affecting individual patients such as irradiating the wrong patient, the wrong, field or site, and mistakes when entering data into or reading from the patient's chart; error due to unusual treatments or situations; equipment failure and human machine problems, including maintenance. (author). 1 ref

  14. Lessons Learned From a Decade of Design, Construction, and Operations of the Environmental Management Waste Management Facility in Oak Ridge, Tennessee - 12062

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Joe [Bechtel National, Inc., Oak Ridge, TN 37830 (United States)

    2012-07-01

    The Environmental Management Waste Management Facility (EMWMF) is the Department of Energy's on-site disposal facility for radioactive and hazardous waste generated by the CERCLA cleanup of the Oak Ridge Reservation (ORR). EMWMF recently completed building out to its maximum site capacity and is approaching a decade of operating experience. In meeting the challenges of design, construction, and operation of a mixed waste and low-level radioactive waste disposal facility within the framework of CERCLA, the Bechtel Jacobs Company LLC (BJC) project team learned valuable lessons that may be beneficial to other disposal facilities. Since project inception in 1998, the scope of the effort includes five regulator-approved designs, four phases of construction, and utilization of half of EMWMF's 1.63 M m{sup 3} of airspace during disposal of waste streams from across the ORR. Funding came from the broadest possible range of sources - privatization, American Recovery and Reinvestment Act, and two funding appropriation accounts. In the process of becoming the cost effective disposal outlet for the majority of the ORR cleanup waste, EMWMF overcame numerous challenges. Lessons learned were a key factor in achieving that success. Many of EMWMF's challenges are common to other disposal facilities. Sharing the successes and lessons learned will help other facilities optimize design, construction, and operations. (author)

  15. PUREX/UO{sub 3} facilities deactivation lessons learned history

    Energy Technology Data Exchange (ETDEWEB)

    Hamrick, D.G.; Gerber, M.S.

    1995-01-01

    The Plutonium-Uranium Extraction (PUREX) Facility operated from 1956-1972, from 1983-1988, and briefly during 1989-1990 to produce for national defense at the Hanford Site in Washington State. The Uranium Trioxide (UO{sub 3}) Facility operated at the Hanford Site from 1952-1972, 1984-1988, and briefly in 1993. Both plants were ordered to permanent shutdown by the U.S. Department of Energy (DOE) in December 1992, thus initiating their deactivation phase. Deactivation is that portion of a facility`s life cycle that occurs between operations and final decontamination and decommissioning (D&D). This document details the history of events, and the lessons learned, from the time of the PUREX Stabilization Campaign in 1989-1990, through the end of the first full fiscal year (FY) of the deactivation project (September 30, 1994).

  16. The Application of Lean Thinking Principles and Kaizen Practices for the Successful Development and Implementation of the Ares I-X Flight Test Rocket and Mission

    Science.gov (United States)

    Askins, B. R.; Davis, S. R.; Heitzman, K. S.; Olsen, R. A.

    2011-01-01

    On October 28, 2009 the Ares I-X flight test rocket launched from Kennedy Space Center and flew its suborbital trajectory as designed. The mission was successfully completed as data from the test, and associated development activities were analyzed, transferred to stakeholders, and well documented. A positive lesson learned from Ares I-X was that the application of lean thinking principles and kaizen practices was very effective in streamlining development activities. Ares I-X, like other historical rocket development projects, was hampered by technical, cost, and schedule challenges and if not addressed boldly could have resulted in cancellation of the test. The mission management team conducted nine major meetings, referred to as lean events, across its elements to assess plans, procedures, processes, requirements, controls, culture, organization, use of resources, and anything that could be changed to optimize schedule or reduce risk. The preeminent aspect of the lean events was the focus on value added activities and the removal or at least reduction in non-value added activities. Trained Lean Six Sigma facilitators assisted the Ares I-X developers in conducting the lean events. They indirectly helped formulate the mission s own unique methodology for assessing schedule. A core team was selected to lead the events and report to the mission manager. Each activity leveraged specialized participants to analyze the subject matter and its related processes and then recommended alternatives and solutions. Stakeholders were the event champions. They empowered and encouraged the team to succeed. The keys to success were thorough preparation, honest dialog, small groups, adherence to the Ares I-X ground rules, and accountability through disciplined reporting and tracking of actions. This lean event formula was game-changing as demonstrated by Ares I-X. It is highly recommended as a management tool to help develop other complex systems efficiently. The key benefits for

  17. Scaling Lean in primary care: impacts on system performance.

    Science.gov (United States)

    Hung, Dorothy Y; Harrison, Michael I; Martinez, Meghan C; Luft, Harold S

    2017-03-01

    We examined a wide range of performance outcomes after Lean methodology-a leading strategy to enhance efficiency and patient value-was implemented and scaled across all primary care clinics in a nonprofit, ambulatory care delivery system. Using a stepped wedge approach, we assessed changes associated with the phased introduction of Lean-based redesigns across 46 primary care departments in 17 different clinic locations. Longitudinal analysis of operational metrics included: workflow efficiency, physician productivity, operating expenses, clinical quality, and satisfaction among patients, physicians, and staff. We used interrupted time series analysis with generalized linear mixed models to estimate Lean impacts over time. Projected outcomes in the absence of changes (ie, counterfactuals) were compared with observed outcomes after Lean redesigns were implemented, and mean differences were assessed using 95% bias-corrected bootstrap confidence intervals (CIs). We observed systemwide improvements in workflow efficiencies (eg, 95% CI, 5.8-10.4) and physician productivity (95% CI, 3.9-27.2), with no adverse effects on clinical quality. Patient satisfaction increased with respect to access to care (95% CI, 15.2-20.7), handling of personal issues (95% CI, 2.1-6.9), and overall experience of care (95% CI, 11.0-17.0), but decreased with respect to interactions with care providers (95% CI, -13.4 to -5.7). Departmental operating costs decreased, and annual staff and physician satisfaction scores increased particularly among early adopters, with key improvements in employee engagement, connection to purpose, relationships with staff, and physician time spent working. Lean redesigns can benefit primary care patients, physicians, and staff without negatively impacting the quality of clinical care. Study results may lead other delivery system leaders to innovate using Lean techniques and may further enhance support for Lean learning among public and private payers.

  18. Researching Lean: Methodological implications of loose definitions

    DEFF Research Database (Denmark)

    Brännmark, Mikael; Langstrand, Jostein; Johansson, Stina

    2012-01-01

    practices seem to overlap with other popular management concepts, such as High Performance Work Systems, World Class Manufacturing and Total Quality Management. This confusion, combined with different methodological and theoretical traditions, has led to much debate and contradictory conclusions regarding...... Lean. The purpose of the paper is to illustrate some key methodological issues that need to be considered in future Lean research to allow increased understanding of Lean effects for different stakeholders, primarily meaning the customer, employer and employees. Design/methodology/approach – The paper...... on the case studies, we suggest that future investigations describe the Lean interventions in more detail. General descriptions or analogies, e.g. ‘learning organizations’, presumably increase the present confusion regarding Lean impact on different stakeholders. The case studies also illustrate...

  19. Guiding inpatient quality improvement: a systematic review of Lean and Six Sigma.

    Science.gov (United States)

    Glasgow, Justin M; Scott-Caziewell, Jill R; Kaboli, Peter J

    2010-12-01

    Two popular quality improvement (QI) approaches in health care are Lean and Six Sigma. Hospitals continue to adopt these QI approaches-or the hybrid Lean Sigma approach-with little knowledge on how well they produce sustainable improvements. A systematic literature review was conducted to determine whether Lean, Six Sigma, or Lean Sigma have been effectively used to create and sustain improvements in the acute care setting. Databases were searched for articles published in the health care, business, and engineering literatures. Study inclusion criteria required identification of a Six Sigma, Lean, or Lean Sigma project; QI efforts focused on hospitalized patients; descriptions of project improvements; and reported results. Depending on the quality of data reported, articles were classified as summary reports, pre-post observational studies, or time-series reports. Database searches identified 539 potential articles. After review of titles, abstracts, and full text, 47 articles met inclusion criteria--10 articles summarized multiple projects, 12 reported Lean projects, 20 reported Six Sigma projects, and 5 reported Lean Sigma projects. Generally, the studies provided limited data, with only 15 articles providing any sort of follow-up data; of the 15, only 3 report a follow-up period greater than two years. Lean, Six Sigma, and Lean Sigma as QI approaches can aid institutions in tackling a wide variety of problems encountered in acute care. However, the true impact of these approaches is difficult to judge, given that the lack of rigorous evaluation or clearly sustained improvements provides little evidence supporting broad adoption. There is still a need for future work that will improve the evidence base for understanding more about QI approaches and how to achieve sustainable improvement.

  20. Lessons Learned from the Jefferson Lab - SNS Cryomodule Production Run

    International Nuclear Information System (INIS)

    John Hogan; Edward Daly; John Fischer; Joseph Preble

    2005-01-01

    In light of the recent developments with the International Linear Collider (ILC), and the recommendation to utilize ''Cold'' technology for this future particle accelerator, this paper will present the lessons learned from the recently concluded Spallation Neutron Source (SNS) superconducting radio frequency (SRF) cryomodule production run at the Thomas Jefferson National Accelerator Facility (Jefferson Lab). Over the past twenty years Jefferson Lab has worked with industry to successfully design, manufacture, test and commission more SRF cryomodules than any other entity in the United States. The knowledge gained from the design and fabrication of the SNS prototype, eleven - 0.61 (medium) beta and the twelve - 0.81 (high) beta cryomodules, will prove to be an effective asset to the ILC project. After delivery of the final production cryomodule in March 2005, design and fabrication data will be collected, evaluated and presented to make this information beneficial for future particle accelerator projects. Recommendations with respect to these findings will also be presented as an integral part of this paper

  1. Lessons learned in managing crowdsourced data in the Alaskan Arctic.

    Science.gov (United States)

    Mastracci, Diana

    2017-04-01

    There is perhaps no place in which the consequences of global climate change can be felt more acutely than the Arctic. However, due to lack of measurements at the high latitudes, validation processes are often problematic. Citizen science projects, co-designed together with Native communities at the interface of traditional knowledge and scientific research, could play a major role in climate change adaptation strategies by advancing knowledge of the Arctic system, strengthening inter-generational bonds and facilitating improved knowledge transfer. This presentation will present lessons learned from a pilot project in the Alaskan Arctic, in which innovative approaches were used to design climate change adaptation strategies to support young subsistence hunters in taking in-situ measurements whilst out on the sea-ice. Both the socio-cultural and hardware/software challenges presented in this presentation, could provide useful guidance for future programs that aim to integrate citizens' with scientific data in Arctic communities.

  2. Pedagogy and second language learning: Lessons learned from Intensive French

    Directory of Open Access Journals (Sweden)

    Joan Netten

    2005-12-01

    Full Text Available Abstract Through research and classroom observation undertaken while conceptualizing and implementing the Intensive French program in Canada, many new insights were gained into the development of communication skills in a classroom situation. Five lessons learned about the development of spontaneous oral communication are presented in this article: the ineffectiveness of core French in primary school; the minimum number of intensive hours necessary to develop spontaneous oral communication; the need to develop implicit competence rather than explicit knowledge; the distinction between accuracy as knowledge and accuracy as skill; and the importance of teaching strategies focusing on language use. These lessons have implications for our understanding of how oral competence in an L2 develops and for the improvement of communicative language pedagogy.

  3. The learning teacher in a collaborative lesson study team within the context of mathematics

    NARCIS (Netherlands)

    Goei, Sui Lin; Verhoef, Neeltje Cornelia

    2015-01-01

    This paper summarises results of two studies on teachers’ learning when participating in a collaborative Lesson Study team within the context of mathematics teaching. In study one, Lesson Study was used in the classic way of preparing, designing, executing and reflecting on the research lesson.

  4. Design Lessons Drawn from the Decommissioning of Nuclear Facilities

    International Nuclear Information System (INIS)

    2011-05-01

    This report provides an updated compilation incorporating the most recent lessons learned from decommissioning and remediation projects. It is intended as a 'road map' to those seeking to apply these lessons. The report presents the issues in a concise and systematic manner, along with practical, thought-provoking examples. The most important lessons learned in recent years are organized and examined to enable the intended audience to gauge the importance of this aspect of the planning for new nuclear facilities. These will be of special interest to those seeking to construct nuclear facilities for the first time. In Sections 1 and 2, the current situation in the field of decommissioning is reviewed and the relevance and importance of beneficial design features is introduced. A more detailed review of previous and current lessons learned from decommissioning is given in Section 3 where different aspects of the decommissioning process are analysed. From this analysis beneficial design features have been extracted and identified in Section 4 which includes two comprehensive tables where brief descriptions of the features are summarized and responsibilities are identified. Conclusions and key design features and key recommendations are given in Section 5. Two Annexes are included to provide lessons from past projects and past experience and to record notes and extracts taken from a comprehensive list of publications listed in the References on page 47.

  5. Licence renewal in the United States - enhancing the process through lessons learned

    International Nuclear Information System (INIS)

    Walters, D.J.

    2000-01-01

    The Nuclear Energy Institute (NEI) is the Washington based policy organisation representing the broad and varied interests of the diverse nuclear energy industry. It comprises nearly 300 corporate members in 15 countries with a budget last year of about USD 26.5 million. It has been working for 10 years with the Nuclear Regulatory Commission (NRC), colleagues in the industry and others to demonstrate that license renewal is a safe and workable process. The first renewed license was issued on 24 March to BGE for the the Calvert Cliffs plant. One month later the NRC issued the renewed license for the Ocoenne plant. By 'Enhancing the process through lessons learned', we mean reducing the uncertainty in the license renewal process. This is achieved through lessons learned from the net wave of applicants and the reviews of the Calvert Cliffs and Ocoenne applications. Three areas will be covered: - Incentive for minimising uncertainty as industry interest in license renewal is growing dramatically. - Rigorous reviews by Nuclear Regulatory Commission assure continued safety: process put in place by the Nuclear Regulatory Commission to assure safety throughout the license renewal term, specifically areas where the lessons learned suggest improvements can be made. - Lessons learned have identified enhancements to the process: numerous benefits associated with renewal of nuclear power plant licenses for consumers of electricity, the environment, the nuclear operating companies and the nation. (author)

  6. Increasing Therapist Productivity: Using Lean Principles in the Rehabilitation Department of an Academic Medical Center.

    Science.gov (United States)

    Johnson, Diana; Snedeker, Kristie; Swoboda, Michael; Zalieckas, Cheryl; Dorsey, Rachel; Nohe, Cassandra; Smith, Paige; Roche, Renuka

    The Department of Rehabilitation Services, within the University of Maryland Medical Center's 650-bed academic medical center, was experiencing difficulty in meeting productivity standards. Therapists in the outpatient division believed they were not spending enough time performing billable patient care activities. Therapists in the inpatient division had difficulty keeping pace with the volume of incoming referrals. Collectively, these issues caused dissatisfaction among referral sources and frustration among the staff within the rehabilitation department. The department undertook a phased approach to address these issues that included examining the evidence, using Lean process improvement principles, and employing transformational leadership strategies to drive improvements in productivity and efficiency. The lessons learned support the importance of having meaningful metrics appropriate for the patient population served, the use of Lean as an effective tool for improving productivity in rehabilitation departments, the impact of engaging staff at the grassroots level, and the importance of having commitment from leaders. The study findings have implications for not only rehabilitation and hospital leadership, but CEOs and managers of any business who need to eliminate waste or increase staff productivity.

  7. Packages of participation: Swedish employees’ experience of Lean depends on how they are involved

    Science.gov (United States)

    Brännmark, Mikael; Holden, Richard J.

    2013-01-01

    Background Lean Production is a dominant approach in Swedish and global manufacturing and service industries. Studies of Lean’s employee effects are few and contradictory. Purpose Employee effects from Lean are likely not uniform. This paper investigates the effect of employees' participation on their experiences of Lean. Method This study investigated how different packages of employee participation in Lean affected manufacturing workers’ experiences of Lean. During 2008–2011, qualitative and quantitative data were collected from Swedish manufacturing companies participating in the national Swedish Lean Production program Produktionslyftet. Data from 129 surveys (28 companies), 39 semi-structured interviews, and 30 reports were analyzed. In the main analysis, comparisons were made of the survey-reported Lean experiences of employees in three groups: temporary group employees (N = 36), who participated in Lean mostly through intermittent projects; continuous group employees (N = 69), who participated through standing improvement groups; and combined group employees (N = 24), who participated in both ways. Results Continuous group employees had the most positive experience of Lean, followed by the combined group. Temporary group employees had the least positive experiences, being less likely than their counterparts to report that Lean improved teamwork, occupational safety, and change-related learning, decision making, and authority. Conclusions These findings support the importance of continuous, structured opportunities for participation but raise the possibility that more participation may result in greater workload and role overload, mitigating some benefits of employee involvement. Consequently, companies should consider involving employees in change efforts but should attend to the specific design of participation activities. PMID:24665370

  8. Introducing Partnering in Denmark – Lessons Learned Applying Public Private Partnerships as an Innovation Platform

    DEFF Research Database (Denmark)

    Bonke, Sten; Olsen, Ib Steen

    as sustainability and economic welfare and prosperity in society. One approach to increasing the focus and rate of innovation processes is to facilitate closer interaction between at public and private companies targeting new thinking and innovation. This strategy characterises a Plan of Action, published...... work and 4)dissemination and implementation. Lessons learned through the experimental cases are discussed, and the applicability of PPP as an approach to innovation in construction is evaluated. Keywords: public private partnership, partnering, experimental projects, innovation process...

  9. Integration of a mobile-integrated therapy with electronic health records: lessons learned.

    Science.gov (United States)

    Peeples, Malinda M; Iyer, Anand K; Cohen, Joshua L

    2013-05-01

    Responses to the chronic disease epidemic have predominantly been standardized in their approach to date. Barriers to better health outcomes remain, and effective management requires patient-specific data and disease state knowledge be presented in methods that foster clinical decision-making and patient self-management. Mobile technology provides a new platform for data collection and patient-provider communication. The mobile device represents a personalized platform that is available to the patient on a 24/7 basis. Mobile-integrated therapy (MIT) is the convergence of mobile technology, clinical and behavioral science, and scientifically validated clinical outcomes. In this article, we highlight the lessons learned from functional integration of a Food and Drug Administration-cleared type 2 diabetes MIT into the electronic health record (EHR) of a multiphysician practice within a large, urban, academic medical center. In-depth interviews were conducted with integration stakeholder groups: mobile and EHR software and information technology teams, clinical end users, project managers, and business analysts. Interviews were summarized and categorized into lessons learned using the Architecture for Integrated Mobility® framework. Findings from the diverse stakeholder group of a MIT-EHR integration project indicate that user workflow, software system persistence, environment configuration, device connectivity and security, organizational processes, and data exchange heuristics are key issues that must be addressed. Mobile-integrated therapy that integrates patient self-management data with medical record data provides the opportunity to understand the potential benefits of bidirectional data sharing and reporting that are most valuable in advancing better health and better care in a cost-effective way that is scalable for all chronic diseases. © 2013 Diabetes Technology Society.

  10. Lessons learned in radiology

    International Nuclear Information System (INIS)

    Goodenough, D.J.

    2001-01-01

    The paper reviews aspects of the history of radiology with the goal of identifying lessons learned, particularly in the area of radiological protection of the patient in diagnostic and interventional radiology, nuclear medicine and radiotherapy. It is pointed out that since the days of Roentgen there has been a need not only to control and quantify the amount of radiation reaching the patient but also to optimize the imaging process to offer the greatest diagnostic benefit within allowable levels of patient dose. To this end, in diagnostic radiology, one finds the development of better films, X rays tubes, grids, screens and processing techniques, while in fluoroscopy, one sees the increased luminance of calcium tungstate. In interventional radiology, one finds an improvement in catheterization techniques and contrast agents. In nuclear medicine, the development of tracer techniques into modern cameras and isotopes such as technetium can be followed. In radiotherapy, one sees the early superficial X rays and radium sources gradually replaced with radon seeds, supervoltage, 60 Co and today's linear accelerators. Along with the incredible advances in imaging and therapeutic technologies comes the growing realization of the potential danger of radiation and the need to protect the patient (as well as physicians, ancillary personnel and the general population) from unnecessary radiation. The important lesson learned is that we must walk a tightrope, balancing the benefits and risks of any technology utilizing radiation to produce the greatest benefits at the lowest acceptable risk. The alternative techniques using non-ionizing radiation will have to be considered as part of the general armamentarium for medical imaging whenever radiation consequences are unacceptable. (author)

  11. Lessons learned in terms of crisis management

    International Nuclear Information System (INIS)

    2006-01-01

    This document outlines that nobody was prepared to the crisis which occurred after the Chernobyl accident, whether in Russia, Europe or France. In order to illustrate the fact that crisis management has been different from one country to another, the report describes how the crisis has been managed in Norway (which has been quickly reached by fallouts and with a rather high level) and in Switzerland. It comments radioactivity measurements performed in France during spring 1986 by the SCPRI, the CEA and the ISPN. It discusses the lessons drawn in France in terms of emergency situation management regarding the protection of the population, crisis management, and the French post-accidental doctrine. It comments the lessons drawn in eastern European countries, with the cooperative implication of the IRSN. International projects are evoked: the Chernobyl Centre, the French-German Initiative, the European projects (EURANOS, NERIS, FARMING, STRATEGY, MOSES and SAMEN)

  12. Lessons learned on utilizing the SEI/CMM in the federal government work for others environment

    Energy Technology Data Exchange (ETDEWEB)

    Stewart, A.

    1997-11-01

    This report contains viewgraphs on lessons learned on utilizing the Software Engineering Institute Capability Maturity Model in the federal government work for others environment. These viewgraphs outline: data systems research and development; what is the SEI/CMM; Data Systems Research and Development process improvement approach; accomplishments; and lessons learned.

  13. PROJECT BASED LEARNING (PBL TO IMPROVE PSYCHOMOTORIC SKILLS: A CLASSROOM ACTION RESEARCH

    Directory of Open Access Journals (Sweden)

    W. Sumarni

    2016-10-01

    Full Text Available This paper discusses the application of project-based learning (PBL to improve student’ psychomotor skills and concept understanding, as well as knowing what PBL contribution to the improvement of student’ psychomotor skills in chemistry learning. The study was conducted in three cycles. Each cycle consisted of planning, implementation, observation, and reflection steps. One set of data consists of student’ psychomotor skills assesment, student’ conceptual understanding and questionnaire responses were obtained from the action research. Learning process was performed in the eleventh grade students included 37 students (10 males and 27 females and 3 collaborators. The successful research was indicated by 85% of students achieve the mastery learning on concept understanding and well on psychomotor aspects. Data collection was performed using documentation method by questionnaire, observations, and tests. Data was analyzed quantitatively and qualitatively. The results show that all aspects of the psychomotor assessed include sets, mechanical response, complex response, adaptation, and origination were in high category. At the end of the lesson, the project assigned to students were evaluated jointly between teachers and students. The project results in the form of a series of distillation apparatus is applied to separate the natural compounds.

  14. PENGARUH MODEL PROJECT BASED LEARNING TERHADAP KEMAMPUAN BERPIKIR KREATIF MATEMATIKA SISWA

    Directory of Open Access Journals (Sweden)

    Hesti Noviyana

    2017-09-01

    Full Text Available Abstract: The problems in this study relate to the learning model of Project Based Learning and students' creative thinking ability in mathematics. The purpose of the research to know the influence of the model of Project Based Learning on the ability to think creatively mathematics students VIII grade even semester SMP Negeri 3 Bandar Lampung lesson 2016/2017 . The research used experimental method with the population that is all students of class VIII with the amount of 347, while the sample is taken 2 class that is class VIII A as experiment class which amounted to 31, class VIII C as control class which amounted 30. The sample was taken using Cluster Random Sampling technique. To know the ability of creative thinking mathematics students authors perform tests in the form of essays as many as 5 questions that have been tested the validity and reliability. Hypothesis testing in this study using t test. From the results of hypothesis testing using t-test obtained t value = 14.27. From the distribution table t at the significant level of 5% is known t = 2.00 means t> t, so it can be concluded "There is Influence of Model Based Project Based on the Ability of Creative Thinking Mathematics Students".Keywords: Project Based Learning, creative thinking ability of mathematics

  15. SCIENTIFIC APPROACH OF 2013 CURRICULUM: TEACHERS IMPLEMENTATION IN ENGLISH LANGUAGE TEACHING

    Directory of Open Access Journals (Sweden)

    Sri Ratnaningsih

    2017-12-01

    Full Text Available The research is aimed at investigating the teachers implementation of scientific approach in English Language Teaching in one state junior high school in Bandung Regency. In addition, this research discusses the conformation of the Scientific Approach implementation and the lesson plans based on the 2013 curriculum. This research employs a case study qualitative research design. The data were obtained from classroom observation and teachers lesson plan analysis and interview. The findings showed that the teachers implemented the scientific stages in English Language Teaching. They conducted observing, questioning, experimenting, associating and communicating in the sequence activities. Besides, the teachers can demonstrate the student-centered learning strengthened by collaborative, cooperative, active and meaningful learning. However, concerning the conformation of the implementation with lesson plans, based on the indicators, learning objectives, learning materials, learning media, scientific stages and Scientific Approach model (discovery learning, inquiry leaning, problem based learning and project based learning, the teachers still have to underline and mention the Scientific Approach model and state learning objectives. Furthermore, the other components have been presented well in both teaching and lesson plans.

  16. Kick-off research coordination meeting of the IAEA coordinated research project on analyses of, and lessons learned from the operational experience with fast reactor equipment and systems. Working material

    International Nuclear Information System (INIS)

    2007-01-01

    The specific objectives of the IAEA Coordinated Research Project (CRP) on Analyses of, and Lessons Learned from the Operational Experience with Fast Reactor Equipment and Systems are to - Preserve the feedback from commissioning, operation, and decommissioning experience of experimental and power sodium cooled fast reactors; - Enable easy access to the information from this feedback; - Produce lessons-learned/synthesis reports from the commissioning, operation, and decommissioning of experimental and power sodium cooled fast reactors. To achieve these objectives, the CRP participants will retrieve, assess and archive all the documentation and information relevant to feedback from commissioning, operation, and decommissioning of sodium cooled fast reactors. The archiving step may include conversion of the documents in electronic form and the preparation of electronic databases organized along scientific/technical topics and reactors. Then, the CRP will work on the critical review, assessment, and systematization of the available data, and will publish synthesis reports, including the appropriate recommendations from the 'lessons learned'. It is important to stress that these generalization efforts are crucial in view of the generational change occurring now: preserving the knowledge and experience of the generation who participated in the initial development work of sodium cooled fast reactors and is now retiring, and ultimately ensuring the systematic use of the operational feedback in the form of a 'lessons learned' approach, is essential since it was in the early stage of the studies that the key decisions and design choices were made. To accomplish the lessons-learned and synthesising work requires for as many as possible of the highly skilled specialists and pioneers in the sodium cooled fast reactor research and development area to be actively involved in the CRP. Thus, the first stage of the CRP will address feedback from operational experience with regard to

  17. Overdose prevention for injection drug users: lessons learned from naloxone training and distribution programs in New York City.

    Science.gov (United States)

    Piper, Tinka Markham; Rudenstine, Sasha; Stancliff, Sharon; Sherman, Susan; Nandi, Vijay; Clear, Allan; Galea, Sandro

    2007-01-25

    Fatal heroin overdose is a significant cause of mortality for injection drug users (IDUs). Many of these deaths are preventable because opiate overdoses can be quickly and safely reversed through the injection of Naloxone [brand name Narcan], a prescription drug used to revive persons who have overdosed on heroin or other opioids. Currently, in several cities in the United States, drug users are being trained in naloxone administration and given naloxone for immediate and successful reversals of opiate overdoses. There has been very little formal description of the challenges faced in the development and implementation of large-scale IDU naloxone administration training and distribution programs and the lessons learned during this process. During a one year period, over 1,000 participants were trained in SKOOP (Skills and Knowledge on Opiate Prevention) and received a prescription for naloxone by a medical doctor on site at a syringe exchange program (SEP) in New York City. Participants in SKOOP were over the age of 18, current participants of SEPs, and current or former drug users. We present details about program design and lessons learned during the development and implementation of SKOOP. Lessons learned described in the manuscript are collectively articulated by the evaluators and implementers of the project. There were six primary challenges and lessons learned in developing, implementing, and evaluating SKOOP. These include a) political climate surrounding naloxone distribution; b) extant prescription drug laws; c) initial low levels of recruitment into the program; d) development of participant appropriate training methodology; e) challenges in the design of a suitable formal evaluation; and f) evolution of program response to naloxone. Other naloxone distribution programs may anticipate similar challenges to SKOOP and we identify mechanisms to address them. Strategies include being flexible in program planning and implementation, developing evaluation

  18. Results and lessons learned of the first edition of the master in nuclear engineering and applications (MINA)

    Energy Technology Data Exchange (ETDEWEB)

    Herranz, Luis E.; Garcia, Juan c.; Falcon, Susana; Marco, Maria l.; Gonzalez Romero, Enrique M. [Centro de Investigaciones Energeticas Medioambientales y Tecnologicas (CIEMAT), Avda. Complutense, 22. 28040 Madrid (Spain); Casas, Jose A. [Universidad Autonoma de Madrid, Seccion Departamental de Ingenieria Quimica, 28049 Cantoblanco, Madrid (Spain)

    2010-07-01

    The Master in Nuclear Engineering and Applications (MINA) was born to build up a bridge between University education and the technical skills demanded by nuclear industry and organizations, particularly in Spain. Motivated by nuclear renaissance, knowledge preservation and the bases of the European Education area, the new approach adopted to accomplish such a challenge has been heavily based on a professional profile defined by the Spanish nuclear community. The first edition success (MINA-2008) has been assessed through a set of indicators, which encompass a broad range of aspects, from the number of registrations to the employment rate. This paper summarizes and discusses such an assessment. Additionally, a critical thorough review has allowed identifying a few aspects that could be improved. All the lessons learned have been translated into specific measures implemented in the MINA-2009 edition. Among the indicators, participation and industrial support were considered of utmost importance. MINA-2008 had 18 students, out of which 60% were financially supported to some extent thanks to the nuclear industry and organizations (during the conduction of the master project, this support was even enhanced). Beyond the economic contribution, nuclear companies and institutions were strongly involved in all the phases of MINA-2008, from the definition of the program up to the supervision of more than 70 % of the master projects. As a result of the lessons learned, the subjects have been grouped in modules and a more practical approach has been pursued in the teaching/learning process. (authors)

  19. Results and lessons learned of the first edition of the master in nuclear engineering and applications (MINA)

    International Nuclear Information System (INIS)

    Herranz, Luis E.; Garcia, Juan c.; Falcon, Susana; Marco, Maria l.; Gonzalez Romero, Enrique M.; Casas, Jose A.

    2010-01-01

    The Master in Nuclear Engineering and Applications (MINA) was born to build up a bridge between University education and the technical skills demanded by nuclear industry and organizations, particularly in Spain. Motivated by nuclear renaissance, knowledge preservation and the bases of the European Education area, the new approach adopted to accomplish such a challenge has been heavily based on a professional profile defined by the Spanish nuclear community. The first edition success (MINA-2008) has been assessed through a set of indicators, which encompass a broad range of aspects, from the number of registrations to the employment rate. This paper summarizes and discusses such an assessment. Additionally, a critical thorough review has allowed identifying a few aspects that could be improved. All the lessons learned have been translated into specific measures implemented in the MINA-2009 edition. Among the indicators, participation and industrial support were considered of utmost importance. MINA-2008 had 18 students, out of which 60% were financially supported to some extent thanks to the nuclear industry and organizations (during the conduction of the master project, this support was even enhanced). Beyond the economic contribution, nuclear companies and institutions were strongly involved in all the phases of MINA-2008, from the definition of the program up to the supervision of more than 70 % of the master projects. As a result of the lessons learned, the subjects have been grouped in modules and a more practical approach has been pursued in the teaching/learning process. (authors)

  20. Developing Research Collaborations in an Academic Clinical Setting: Challenges and Lessons Learned.

    Science.gov (United States)

    Sahs, John A; Nicasio, Andel V; Storey, Joan E; Guarnaccia, Peter J; Lewis-Fernández, Roberto

    2017-08-01

    Research collaboration in "real world" practice settings may enhance the meaningfulness of the findings and reduce barriers to implementation of novel intervention strategies. This study describes an initiative to integrate research into a hospital-based outpatient psychiatric clinic within an academic medical center, focusing on collaborative processes across three research projects. We report on the varied outcomes of the projects and utilize data from two focus groups to identify the key elements that contributed to the challenges and successes. We identify barriers to practice-research collaborations that emerged even when the initial circumstances of the partnership were favorable. These barriers include the presence of varied agendas across clinicians and investigators, resource constraints, limited staff buy-in, and staff turnover. In highlighting the lessons learned in this collaborative process, we hope to facilitate successful partnerships in other clinical settings.

  1. The formation of a complex community program for diabetes control: lessons learned from a case study of Project DIRECT.

    Science.gov (United States)

    Goodman, R M; Liburd, L C; Green-Phillips, A

    2001-05-01

    A case study was conducted of the formation of a diabetes initiative in a largely African American urban community. The study focused on how confluent the original project model was with actual formation, what benefits were produced, what areas of needed improvement surfaced, and how different stakeholder groups characterized one another's involvement. The project produced several benefits but also experienced needed improvements in its formation, which suffered from a lack of communication, cooperation, and coordination; unclear goals and personnel roles; and early delays. Lessons include treating project formation as an important developmental stage and reducing bureaucratic management approaches not suited for community partnerships.

  2. Lessons learned from Spain's nuclear program

    International Nuclear Information System (INIS)

    Garcia Rodriguez, A.

    1993-01-01

    The commercial nuclear program in Spain dates back to the beginning of the 1960s. There are currently nine units in operation, one more has been decommissioned and a further five are in different phases of construction but under nuclear moratorium since 1983. This article gives a general overview of the program, the criteria applied, what it has meant to and required of the industry and, finally, what lessons have been learned. (author) 2 figs

  3. The Gunite and Associated Tanks Remediation Project Tank Waste Retrieval Performance and Lessons Learned, vol. 1 [of 2

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, BE

    2003-10-07

    The Gunite and Associated Tanks (GAAT) Remediation Project was the first of its kind performed in the United States. Robotics and remotely operated equipment were used to successfully transfer almost 94,000 gal of remote-handled transuranic sludge containing over 81,000 Ci of radioactive contamination from nine large underground storage tanks at the Oak Ridge National Laboratory (ORNL). The sludge was transferred with over 439,000 gal of radioactive waste supernatant and {approx}420,500 gal of fresh water that was used in sluicing operations. The GAATs are located in a high-traffic area of ORNL near a main thoroughfare. A phased and integrated approach to waste retrieval operations was used for the GAAT Remediation Project. The project promoted safety by obtaining experience from low-risk operations in the North Tank Farm before moving to higher-risk operations in the South Tank Farm. This approach allowed project personnel to become familiar with the tanks and waste, as well as the equipment, processes, procedures, and operations required to perform successful waste retrieval. By using an integrated approach to tank waste retrieval and tank waste management, the project was completed years ahead of the original baseline schedule, which resulted in avoiding millions of dollars in associated costs. This report is organized in two volumes. Volume 1 provides information on the various phases of the GAAT Remediation Project. It also describes the different types of equipment and how they were used. The emphasis of Volume 1 is on the description of the tank waste retrieval performance and the lessons learned during the GAAT Remediation Project. Volume 2 provides the appendixes for the report, which include the following information: (A) Background Information for the Gunite and Associated Tanks Operable Unit; (B) Annotated Bibliography; (C) Comprehensive Listing of the Sample Analysis Data from the GAAT Remediation Project; (D) GAAT Equipment Matrix; and (E) Vendor List

  4. Unintended Learning in Primary School Practical Science Lessons from Polanyi's Perspective of Intellectual Passion

    Science.gov (United States)

    Park, Jisun; Song, Jinwoong; Abrahams, Ian

    2016-03-01

    This study explored, from the perspective of intellectual passion developed by Michael Polanyi, the unintended learning that occurred in primary practical science lessons. We use the term `unintended' learning to distinguish it from `intended' learning that appears in teachers' learning objectives. Data were collected using video and audio recordings of a sample of twenty-four whole class practical science lessons, taught by five teachers, in Korean primary schools with 10- to 12-year-old students. In addition, video and audio recordings were made for each small group of students working together in order to capture their activities and intra-group discourse. Pre-lesson interviews with the teachers were undertaken and audio-recorded to ascertain their intended learning objectives. Selected key vignettes, including unintended learning, were analysed from the perspective of intellectual passion developed by Polanyi. What we found in this study is that unintended learning could occur when students got interested in something in the first place and could maintain their interest. In addition, students could get conceptual knowledge when they tried to connect their experience to their related prior knowledge. It was also found that the processes of intended learning and of unintended learning were different. Intended learning was characterized by having been planned by the teacher who then sought to generate students' interest in it. In contrast, unintended learning originated from students' spontaneous interest and curiosity as a result of unplanned opportunities. Whilst teachers' persuasive passion comes first in the process of intended learning, students' heuristic passion comes first in the process of unintended learning. Based on these findings, we argue that teachers need to be more aware that unintended learning, on the part of individual students, can occur during their lesson and to be able to better use this opportunity so that this unintended learning can be

  5. Automated Reasoning Across Tactical Stories to Derive Lessons Learned

    Directory of Open Access Journals (Sweden)

    J. Wesley Regian

    2008-06-01

    Full Text Available The Military Analogical Reasoning System (MARS is a performance support system and decision aid for commanders in Tactical Operations Centers. MARS enhances and supports the innate human ability for using stories to reason about tactical goals, plans, situations, and outcomes. The system operates by comparing many instances of stored tactical stories, determining which have analogous situations and lessons learned, and then returning a description of the lessons learned. The description of the lessons learned is at a level of abstraction that can be generalized to an appropriate range of tactical situations. The machine-understandable story representation is based on a military operations data model and associated tactical situation ontology. Thus each story can be thought of, and reasoned about, as an instance of an unfolding tactical situation. The analogical reasoning algorithm is based on Gentner's Structure Mapping Theory. Consider the following two stories. In the first, a U.S. platoon in Viet Nam diverts around a minefield and subsequently comes under ambush from a large hill overlooking their new position. In the second, a U.S. task force in Iraq diverts around a biochemical hazard and subsequently comes under ambush from the roof of an abandoned building. MARS recognizes these stories as analogical, and derives the following abstraction: When enemy-placed obstacles force us into an unplanned route, beware of ambush from elevation or concealment. In this paper we describe the MARS interface, military operations data model, tactical situation ontology, and analogical reasoning algorithm.

  6. Winning the Peace: Building a Strategic Level Lessons Learned Program

    National Research Council Canada - National Science Library

    French, Daniel L

    2007-01-01

    The U.S. military has developed a robust, comprehensive system to capture, analyze, and disseminate tactical-level and operational-level lessons learned from training events and ongoing conflict operations...

  7. The individual teacher in lesson study collaboration

    DEFF Research Database (Denmark)

    Skott, Charlotte Krog; Møller, Hanne

    2017-01-01

    used in lesson study research. Design/methodology/approach The authors use collective case studies. By being participant observers the authors provide detailed descriptions of two selected teachers’ lived experiences of lesson study collaboration. In addition to gain first-hand insights, the authors...... in the participation of each of the two teachers during a two-year lesson study project. By comparing these shifts the authors identify significant conditions for their individual learning. Research limitations/implications Although the study is small scale, both the insights into the different ways in which teachers...... participated and the theoretical insights might be valuable for other lesson study research approaches. Practical implications This paper provides valuable insights into conditions that might influence teachers’ participation in lesson study activities, especially in cultures with little experience of lesson...

  8. "Art Can Be Beautiful--If You Understand It...": Learning Effects of Arts Education Projects among Secondary School Pupils in the Netherlands.

    Science.gov (United States)

    Haanstra, Folkert; Van Hoorn, Marjo

    2002-01-01

    Describes Dutch experimental theatre and dance projects in which the artists themselves participated in the preparatory lessons and/or subsequent workshop. Compares learning experiences of pupils 14 to 16 years of age who participated in the projects. Shows that besides gender and level of education, the involvement of the artist significantly…

  9. Human Capital Spillovers in Families: Do Parents Learn from or Lean on Their Children? NBER Working Paper No. 17235

    Science.gov (United States)

    Kuziemko, Ilyana

    2011-01-01

    I develop a model in which a child's acquisition of a given form of human capital incentivizes adults in his household to either learn from him (if children act as teachers then adults' cost of learning the skill falls) or lean on him (if children's human capital substitutes for that of adults in household production then adults' benefit of…

  10. Let's Cooperate! Integrating Cooperative Learning Into a Lesson on Ethics.

    Science.gov (United States)

    Reineke, Patricia R

    2017-04-01

    Cooperative learning is an effective teaching strategy that promotes active participation in learning and can be used in academic, clinical practice, and professional development settings. This article describes that strategy and provides an example of its use in a lesson about ethics. J Contin Nurs Educ. 2017;48(4):154-156. Copyright 2017, SLACK Incorporated.

  11. Buried Waste Integrated Demonstration lessons learned: 1993 technology demonstrations

    International Nuclear Information System (INIS)

    Kostelnik, K.M.; Owens, K.J.

    1994-01-01

    An integrated technology demonstration was conducted by the Buried Waste Integrated Demonstration (BWID) at the Idaho National Engineering Laboratory Cold Test Pit in the summer of 1993. This program and demonstration was sponsored by the US Department of Energy Office of Technology Development. The demonstration included six technologies representing a synergistic system for the characterization and retrieval of a buried hazardous waste site. The integrated technology demonstration proved very successful and a summary of the technical accomplishments is presented. Upon completion of the integrated technology demonstration, cognizant program personnel participated in a lessons learned exercise. This exercise was conducted at the Simplot Decision Support Center at Idaho State University and lessons learned activity captured additional information relative to the integration of technologies for demonstration purposes. This information will be used by BWID to enhance program planning and strengthen future technology demonstrations

  12. Combining Project-Based Learning and Community-Based Research in a Research Methodology Course: The Lessons Learned

    Science.gov (United States)

    Arantes do Amaral, João Alberto; Lino dos Santos, Rebeca Júlia Rodrigues

    2018-01-01

    In this article, we present our findings regarding the course "Research Methodology," offered to 22 first-year undergraduate students studying Administration at the Federal University of São Paulo, Osasco, Brazil. The course, which combined community-based research and project-based learning, was developed during the second semester of…

  13. High School Principals and School Reform: Lessons Learned from a Statewide Study of Project Re:Learning.

    Science.gov (United States)

    Anderson, Lorin W.; Shirley, J. Robert

    1995-01-01

    Summarizes a study examining the high school principal's role in providing the leadership needed to explore and implement Project Re:Learning. The 4-phase study initially included 15 schools and involved questionnaires, interviews, and shadowing. Identifies six types of administrators: the absent administrator, the pawn, the pragmatic principal,…

  14. Lessons Learned and Challenges in Building a Filipino Health Coalition

    Science.gov (United States)

    Aguilar, David E.; Abesamis-Mendoza, Noilyn; Ursua, Rhodora; Divino, Lily Ann M.; Cadag, Kara; Gavin, Nicholas P.

    2010-01-01

    In recent years, community-based coalitions have become an effective channel to addressing various health problems within specific ethnic communities. The purpose of this article is twofold: (a) to describe the process involved in building the Kalusugan Coalition (KC), a Filipino American health coalition based in New York City, and (b) to highlight the lessons learned and the challenges from this collaborative venture. The challenges described also offer insights on how the coalition development process can be greatly affected by the partnership with an academic institution on a community-based research project. Because each cultural group has unique issues and concerns, the theoretical framework used by KC offers creative alternatives to address some of the challenges regarding coalition infrastructures, leadership development, unexpected change of coalition dynamics, and cultural nuances. PMID:19098260

  15. Cost-effective facility disposition planning with safety and health lessons learned and good practices from the Oak Ridge Decontamination and Decommissioning Program

    International Nuclear Information System (INIS)

    1998-05-01

    An emphasis on transition and safe disposition of DOE excess facilities has brought about significant challenges to managing worker, public, and environmental risks. The transition and disposition activities involve a diverse range of hazardous facilities that are old, poorly maintained, and contain radioactive and hazardous substances, the extent of which may be unknown. In addition, many excess facilities do not have historical facility documents such as operating records, plant and instrumentation diagrams, and incident records. The purpose of this report is to present an overview of the Oak Ridge Decontamination and Decommissioning (D and D) Program, its safety performance, and associated safety and health lessons learned and good practices. Illustrative examples of these lessons learned and good practices are also provided. The primary focus of this report is on the safety and health activities and implications associated with the planning phase of Oak Ridge facility disposition projects. Section 1.0 of this report provides the background and purpose of the report. Section 2.0 presents an overview of the facility disposition activities from which the lessons learned and good practices discussed in Section 3.0 were derived

  16. Project KEWL: Kinect Engineering With Learning

    Science.gov (United States)

    Norris, Jeff; Goza, Sharon; Shores, David

    2011-01-01

    Project KEWL is a joint project between NASA/JPL and NASA/JSC to stimulate interest of children in Science, Technology, Engineering and Math (STEM) and bring the NASA space exploration experience to the classroom, museum and ultimately the living room. Using the Kinect game controller KEWL allows children to engage in NASA s missions in a fundamentally new way. KEWL allows children to experiment with gravity on Mars and the Moon; navigate through the International Space Station; fix a torn solar array on the ISS; drive a robot on Mars; visit an Asteroid; learn about the differences in gravity on different planets and control Robonaut 2 using their body as the input device. Project KEWL complements NASA s outreach investments in television, mobile platforms and the web by engaging the public through the rapidly expanding medium of console gaming. In 2008, 97% of teenagers played video games and 86% played on a home gaming console. (source: http://pewresearch.org/pubs/953/) As of March 2011, there have been more than 10 million Kinects sold. (source: http://www.itproportal.com/2011/03/10/kinect-record-breaking-sales-figures-top-10-million/) Project KEWL interacts with children on a platform on which they spend much of their time and teaches them information about NASA while they are having fun. Project KEWL progressed from completely custom C++ code written in house to using a commercial game engine. The art work and 3D geometry models come from existing engineering work or are created by the KEWL development team. Six different KEWL applications have been demonstrated at nine different venues including schools, museums, conferences, and NASA outreach events. These demonstrations have allowed the developers the chance to interact with players and observe the gameplay mechanics in action. The lessons learned were then incorporated into the subsequent versions of the applications.

  17. Space Shuttle Program Primary Avionics Software System (PASS) Success Legacy -Major Accomplishments and Lessons Learned

    Science.gov (United States)

    Orr, James K.

    2010-01-01

    This presentation has shown the accomplishments of the PASS project over three decades and highlighted the lessons learned. Over the entire time, our goal has been to continuously improve our process, implement automation for both quality and increased productivity, and identify and remove all defects due to prior execution of a flawed process in addition to improving our processes following identification of significant process escapes. Morale and workforce instability have been issues, most significantly during 1993 to 1998 (period of consolidation in aerospace industry). The PASS project has also consulted with others, including the Software Engineering Institute, so as to be an early evaluator, adopter, and adapter of state-of-the-art software engineering innovations.

  18. Mentorship and coaching to support strengthening healthcare systems: lessons learned across the five Population Health Implementation and Training partnership projects in sub-Saharan Africa.

    Science.gov (United States)

    Manzi, Anatole; Hirschhorn, Lisa R; Sherr, Kenneth; Chirwa, Cindy; Baynes, Colin; Awoonor-Williams, John Koku

    2017-12-21

    Despite global efforts to increase health workforce capacity through training and guidelines, challenges remain in bridging the gap between knowledge and quality clinical practice and addressing health system deficiencies preventing health workers from providing high quality care. In many developing countries, supervision activities focus on data collection, auditing and report completion rather than catalyzing learning and supporting system quality improvement. To address this gap, mentorship and coaching interventions were implemented in projects in five African countries (Ghana, Mozambique, Rwanda, Tanzania, and Zambia) as components of health systems strengthening (HSS) strategies funded through the Doris Duke Charitable Foundation's African Health Initiative. We report on lessons learned from a cross-country evaluation. The evaluation was designed based on a conceptual model derived from the project-specific interventions. Semi-structured interviews were administered to key informants to capture data in six categories: 1) mentorship and coaching goals, 2) selection and training of mentors and coaches, 3) integration with the existing systems, 4) monitoring and evaluation, 5) reported outcomes, and 6) challenges and successes. A review of project-published articles and technical reports from the individual projects supplemented interview information. Although there was heterogeneity in the approaches to mentorship and coaching and targeted areas of the country projects, all led to improvements in core health system areas, including quality of clinical care, data-driven decision making, leadership and accountability, and staff satisfaction. Adaptation of approaches to reflect local context encouraged their adoption and improved their effectiveness and sustainability. We found that incorporating mentorship and coaching activities into HSS strategies was associated with improvements in quality of care and health systems, and mentorship and coaching represents an

  19. Lessons Learned in Preparation and Review of Safety Analysis Report of PUSPATI TRIGA Reactor in Malaysia

    Energy Technology Data Exchange (ETDEWEB)

    Maskin, Mazleha [Korea Advanced Institute for Science and Technology, Daejeon (Korea, Republic of); Choi, Kwang Sik [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2010-05-15

    PUSPATI TRIGA Reactor (RTP) is the one and only research reactor in Malaysia. Since the day it was supplied by General Atomic (GA) in 1983, periodic safety reviews were carried out but not published in the form of a complete SAR. In fact, the original SAR (SAR 1983) document was provided by GA as soon as GA was selected as the supplier of RTP. The focus of this report is on the lessons learned from the preparation of SAR. The lessons learned were to address the preparation and regulatory review of the second SAR (SAR 2006). Realizing that safety is important as RTP is aging, the experiences and lessons learned from SAR development and updating processes are of great value for all parties involved. The purpose of this report is to consolidate and organize the lessons learned and suggest the best practice for the next SAR development both in preparation and regulatory review

  20. Lessons Learned in Preparation and Review of Safety Analysis Report of PUSPATI TRIGA Reactor in Malaysia

    International Nuclear Information System (INIS)

    Maskin, Mazleha; Choi, Kwang Sik

    2010-01-01

    PUSPATI TRIGA Reactor (RTP) is the one and only research reactor in Malaysia. Since the day it was supplied by General Atomic (GA) in 1983, periodic safety reviews were carried out but not published in the form of a complete SAR. In fact, the original SAR (SAR 1983) document was provided by GA as soon as GA was selected as the supplier of RTP. The focus of this report is on the lessons learned from the preparation of SAR. The lessons learned were to address the preparation and regulatory review of the second SAR (SAR 2006). Realizing that safety is important as RTP is aging, the experiences and lessons learned from SAR development and updating processes are of great value for all parties involved. The purpose of this report is to consolidate and organize the lessons learned and suggest the best practice for the next SAR development both in preparation and regulatory review

  1. Lean Transformation Guidance: Why Organizations Fail To Achieve and Sustain Excellence Through Lean Improvement

    Directory of Open Access Journals (Sweden)

    Mohammed Hamed Ahmed

    2013-06-01

    Full Text Available Many companies are complaining that lean didn’t achieve their long-term goals, and the improvement impact was very short-lived. 7 out of each 10 lean projects fail as companies try to use lean like a toolkit, copying and pasting the techniques without trying to adapt the employee’s culture, manage the improvement process, sustain the results, and develop their leaders. When the Toyota production system was created, the main goal was to remove wastes from the shop floor using some lean techniques and tools. What was not clear is that this required from Toyota a long process of leadership development, and a high commitment to training and coaching their employee. A Failure to achieve and sustain the improvement is a problem of both management and leadership as well as the improper understanding of the human behavior, and the required culture to success.

  2. The X-15 airplane - Lessons learned

    Science.gov (United States)

    Dana, William H.

    1993-01-01

    The X-15 rocket research airplane flew to an altitude of 354,000 ft and reached Mach 6.70. In almost 200 flights, this airplane was used to gather aerodynamic-heating, structural loads, stability and control, and atmospheric-reentry data. This paper describes the origins, design, and operation of the X-15 airplane. In addition, lessons learned from the X-15 airplane that are applicable to designing and testing the National Aero-Space Plane are discussed.

  3. Project scoping for lessons learnt to apply to the Celtic Seas marine sub-region

    OpenAIRE

    Twomey, Sarah; O'Mahony, Cathal

    2013-01-01

    This report involves a formal scoping exercise to identify lessons from a wide range of previous and current project and initiative experiences at the national, regional seas, European and global levels. An inventory of 77 projects and initiatives that are relevant with regard to the key activities proposed by the Celtic Seas Partnership has been compiled, as well as a short-list of 23 of the most pertinent projects, lessons learnt and contact names. This report has identified a number of syn...

  4. A Lean Framework for Production Control in Complex and Constrained Construction Projects (PC4P)

    DEFF Research Database (Denmark)

    Lindhard, Søren Munch; Wandahl, Søren

    2014-01-01

    Production conditions in construction are different than in themanufacturing industry. First of all, construction is rooted in place and conducted as on-site manufacturing. Secondly, every construction project is unique and a one-of-a-kind production, managed by a temporary organization consisting...... and constrained construction project. Even though several tools have attempted to add structure and to create order, to the complex, dynamic, and uncertain context in which constructions is conducted, none has yet fully succeeded in providing a robust production control system. With outset in the lean tool Last...

  5. Lean practices for quality results: a case illustration.

    Science.gov (United States)

    Hwang, Pauline; Hwang, David; Hong, Paul

    2014-01-01

    Increasingly, healthcare providers are implementing lean practices to achieve quality results. Implementing lean healthcare practices is unique compared to manufacturing and other service industries. The purpose of this paper is to present a model that identifies and defines the lean implementation key success factors in healthcare organisations. The model is based on an extant literature review and a case illustration that explores actual lean implementation in a major USA hospital located in a Midwestern city (approximately 300,000 people). An exploratory/descriptive study using observation and follow-up interviews was conducted to identify lean practices in the hospital. Lean practice key drivers include growing elderly populations, rising medical expenses, decreasing insurance coverage and decreasing management support. Effectively implementing lean practices to increase bottom-line results and improve organisational integrity requires sharing goals and processes among healthcare managers and professionals. An illustration explains the model and the study provides a sound foundation for empirical work. Practical implications are included. Lean practices minimise waste and unnecessary hospital stays while simultaneously enhancing customer values and deploying resources in supply systems. Leadership requires clear project targets based on sound front-end planning because initial implementation steps involve uncertainty and ambiguity (i.e. fuzzy front-end planning). Since top management support is crucial for implementing lean practices successfully, a heavyweight manager, who communicates well both with top managers and project team members, is an important success factor when implementing lean practices. Increasingly, green orientation and sustainability initiatives are phrases that replaced lean practices. Effective results; e.g. waste reduction, employee satisfaction and customer values are applicable to bigger competitive challenges arising both in specific

  6. Sharing lessons learned and best practices in deactivation and decommissioning techniques among U.S. Department of Energy contractors

    International Nuclear Information System (INIS)

    Lackey, Michael B.; Waisley, Sandra L.; Dusek, Lansing G.

    2007-01-01

    Approximately $153.2 billion of work currently remains in the United States Department of Energy's (DOE's) Office of Environmental Management (EM) life cycle budget for United States projects. Contractors who manage facilities for the DOE have been challenged to identify transformational changes to reduce the life cycle costs and develop a knowledge management system that identifies, disseminates, and tracks the implementation of lessons learned and best practices. At the request of the DOE's EM Office of Engineering and Technology, the Energy Facility Contractors Group (EFCOG) responded to the challenge with formation of the Deactivation and Decommissioning (D and D) and Facility Engineering (DD/FE) Working Group. Since October 2006, members have already made significant progress in realizing their goals: adding new D and D best practices to the existing EFCOG Best Practices database; participating in lessons learned forums; and contributing to a DOE initiative on identifying technology needs. The group is also participating in a DOE project management initiative to develop implementation guidelines, as well as a DOE radiation protection initiative to institute a more predictable and standardized approach to approving authorized limits and independently verifying cleanup completion at EM sites. Finally, a D and D hotline to provide real-time solutions to D and D challenges is also being launched. (authors)

  7. Lessons Learned from Becoming an Independent Standards Board.

    Science.gov (United States)

    Board, John C.

    This paper discusses lessons learned from becoming an independent standards board. It begins by explaining that teachers lacked adequate academic preparation during the two World Wars and shortly thereafter. At the end of World War II, public education had to deal with poor pay, little job security, inadequate pensions, and inadequate and…

  8. Developing and managing transdisciplinary and transformative research on the coastal dynamics of sea level rise: Experiences and lessons learned

    Science.gov (United States)

    DeLorme, Denise E.; Kidwell, David; Hagen, Scott C.; Stephens, Sonia H.

    2016-05-01

    There is increasing emphasis from funding agencies on transdisciplinary approaches to integrate science and end-users. However, transdisciplinary research can be laborious and costly and knowledge of effective collaborative processes in these endeavors is incomplete. More guidance grounded in actual project experiences is needed. Thus, this article describes and examines the collaborative process of the Ecological Effects of Sea Level Rise in the Northern Gulf of Mexico transdisciplinary research project, including its development, implementation, and evaluation. Reflections, considerations, and lessons learned from firsthand experience are shared, supported with examples, and connected to relevant scholarly literature.

  9. Lessons Learned for the MICE Coupling Solenoid from the MICE Spectrometer Solenoids

    International Nuclear Information System (INIS)

    Green, Michael A.; Wang, Li; Pan, Heng; Wu, Hong; Guo, Xinglong; Li, S.Y.; Zheng, S.X.; Virostek, Steve P.; DeMello, Allen J.; Li, Derun; Trillaud, Frederick; Zisman, Michael S.

    2010-01-01

    Tests of the spectrometer solenoids have taught us some important lessons. The spectrometer magnet lessons learned fall into two broad categories that involve the two stages of the coolers that are used to cool the magnets. On the first spectrometer magnet, the problems were centered on the connection of the cooler 2nd-stage to the magnet cold mass. On the first test of the second spectrometer magnet, the problems were centered on the cooler 1st-stage temperature and its effect on the operation of the HTS leads. The second time the second spectrometer magnet was tested; the cooling to the cold mass was still not adequate. The cryogenic designs of the MICE and MuCOOL coupling magnets are quite different, but the lessons learned from the tests of the spectrometer magnets have affected the design of the coupling magnets.

  10. Boosting innovation in the water sector--the role and lessons learned from collaborative projects.

    Science.gov (United States)

    Alegre, H; Coelho, S T; Feliciano, J F; Matos, R

    2015-01-01

    A key worldwide challenge in most sectors is to boost the effective adoption of innovation, as underpinned by the new European Union research programme Horizon 2020, which focuses on increasing innovation in Europe from 2014 to 2020. This is particularly relevant in the water sector, often perceived as conservative and averse to change. This paper discusses the role that collaborative knowledge-transfer projects can play in effectively rolling out R&D in the water industry. LNEC (Laboratório Nacional de Engenharia Civil) has designed a structured model based on a phased programme and a network of utilities and researchers. The paper presents the core principles, the rationale, the model and methods used, and the theoretical background, as well as the project's impact, outcomes and products. The discussion highlights the lessons learnt and provides a formal analysis of the advantages of focusing on middle management as an effective entry point, even if innovation is needed across the organization. Making training materials, guidelines, use cases, data and software publicly available after the project's end has proven to have a decisive multiplying effect. The paper also argues in favour of the collaborative model as a basis for R&D sustainability, and details on-going and planned developments.

  11. Lessons Learned from Introducing Social Media Use in Undergraduate Economics Research

    Science.gov (United States)

    O'Brien, Martin; Freund, Katarina

    2018-01-01

    The research process and associated literacy requirements are often unfamiliar and daunting obstacles for undergraduate students. The use of social media has the potential to assist research training and encourage active learning, social inclusion and student engagement. This paper documents the lessons learned from developing a blended learning…

  12. Educating for Freedom and Responsibility: Lessons From the First Amendment Schools Project

    Science.gov (United States)

    Mitchell, Cynthia

    2016-01-01

    The First Amendment Schools project holds rich lessons in how to change school cultures into "laboratories of democracy"--as well as in how to increase the odds of success for any school reform effort. School reform programs of any sort need to make sure to build in sustainability, to provide ways to spread their lessons beyond the…

  13. Learning with multiple representations: an example of a revision lesson in mechanics

    Science.gov (United States)

    Wong, Darren; Poo, Sng Peng; Eng Hock, Ng; Loo Kang, Wee

    2011-03-01

    We describe an example of learning with multiple representations in an A-level revision lesson on mechanics. The context of the problem involved the motion of a ball thrown vertically upwards in air and studying how the associated physical quantities changed during its flight. Different groups of students were assigned to look at the ball's motion using various representations: motion diagrams, vector diagrams, free-body diagrams, verbal description, equations and graphs, drawn against time as well as against displacement. Overall, feedback from students about the lesson was positive. We further discuss the benefits of using computer simulation to support and extend student learning.

  14. Lessons Learned... and Not Learned: A Case Study in Regulatory Evolution

    International Nuclear Information System (INIS)

    Conant, J. F.; Woodard, R. C.

    2006-01-01

    'Are you better off than you were four years ago?' 'You've come a long way, baby.' Eschewing politics and advertising, these idioms are applied to the evolution of regulatory processes for Decontamination and Decommissioning (D and D) of nuclear facilities. We use a case study of a (nearly) completed D and D project at a large nuclear fuel manufacturing facility, to chronicle one licensee's experience with US Nuclear Regulatory Commission (NRC) D and D regulations from the 1990's to the present. Historical milestones include the birth of a D and D project, a false start and resultant consequences, a D and D 'moratorium' with subsequent planning and stakeholder integration, a second start which included the challenge of parallel path D and D physical work and regulatory processes, and the 'lessons learned' contributions to timely project progress. Further discussion includes a look at the 'declaration of victory' and examines what it really means to be finished. The rich contextual experience from the case study and the observations of other industry members provides the basis for answers to several key questions: How far has the regulatory process for D and D really evolved, and in what direction? Are licensees generally satisfied or dissatisfied with the methods? What has not improved? Which improvements looked promising, but languished in recent years? How far have we really come and are we better off? What are the opportunities for further improvement? The summary answer to each question, using compendious engineering terms is... 'it depends'. (authors)

  15. Lessons Learned In Aerosol Monitoring With The RASA

    International Nuclear Information System (INIS)

    Forrester, Joel B.; Bowyer, Ted W.; Carty, Fitz; Comes, Laura; Eslinger, Paul W.; Greenwood, Lawrence R.; Haas, Derek A.; Hayes, James C.; Kirkham, Randy R.; Lepel, Elwood A.; Litke, Kevin E.; Miley, Harry S.; Morris, Scott J.; Schrom, Brian T.; Van Davelaar, Peter; Woods, Vincent T.

    2011-01-01

    The Radionuclide Aerosol Sampler/Analyzer (RASA) is an automated aerosol collection and analysis system designed by Pacific Northwest National Laboratory (PNNL) in the 1990's and is deployed in several locations around the world as part of the International Monitoring System (IMS) required under the Comprehensive Nuclear-Test-Ban Treaty (CTBT). The RASA operates unattended, save for regularly scheduled maintenance, iterating samples through a three-step process on a 24-hour interval. In its 15-year history, much has been learned from the operation and maintenance of the RASA that can benefit engineering updates or future aerosol systems. On 11 March 2011, a 9.0 magnitude earthquake and tsunami rocked the eastern coast of Japan, resulting in power loss and cooling failures at the Daiichi nuclear power plants in Fukushima Prefecture. Aerosol collections were conducted with the RASA in Richland, WA. We present a summary of the lessons learned over the history of the RASA, including lessons taken from the Fukushima incident, regarding the RASA IMS stations operated by the United States.

  16. Measuring efficiency of lean six sigma project implementation using data envelopment analysis at Nasa

    Directory of Open Access Journals (Sweden)

    David Meza

    2013-06-01

    Full Text Available Purpose: This study aims to review the implementation of the Lean Six Sigma project methodology in the Johnson Space Center (JSC business environment of National Aeronautics and Space Administration (NASA with an objective of evaluating performance of individual projects and to develop recommendation for strategies to improve operational efficiencies based on Data Envelopment Analysis (DEA.Design/methodology/approach: In this study, authors propose the Lean Six Sigma project performance evaluation model (LSS-PPEM based on Data DEA where Critical Success Factors (CSFs and Total Team Hours serve as inputs while Process Sigma and Cost avoidance are used as outputs. The CSFs are factors that critically affect the performance of LSS at JSC. Six of those are identified by the Black Belts through Analytical Hierarchical Process, and the values of those are decided by project leaders and Green Belts through survey. Eighteen LSS projects are evaluated, and their results are analyzed.Findings and Originality/value: Eventually, four out of the six CSFs are adopted for this study based upon Pearson correlation analysis, and those four include Project execution and follow up of results; Top management’s commitment and participation; The use of data analysis with easily obtainable data; Attention given to both long and short term targets. Using data between the years 2009 and 2011, seven of the eighteen projects are found to be efficient. The benchmark analysis and slack analysis are conducted to provide further recommendation for JSC managers. Three out of those seven efficient projects are most frequently used as an efficient peer.Practical implications: Traditionally, DEA has been considered as a data-driven approach. In this study, authors incorporate the survey-based CSFs into the DEA frame. Since many organizations may have different CSFs, the framework presented in this study can be easily applied to other organizations.Originality/value: This study

  17. MAVEN Information Security Governance, Risk Management, and Compliance (GRC): Lessons Learned

    Science.gov (United States)

    Takamura, Eduardo; Gomez-Rosa, Carlos A.; Mangum, Kevin; Wasiak, Fran

    2014-01-01

    As the first interplanetary mission managed by the NASA Goddard Space Flight Center, the Mars Atmosphere and Volatile EvolutioN (MAVEN) had three IT security goals for its ground system: COMPLIANCE, (IT) RISK REDUCTION, and COST REDUCTION. In a multiorganizational environment in which government, industry and academia work together in support of the ground system and mission operations, information security governance, risk management, and compliance (GRC) becomes a challenge as each component of the ground system has and follows its own set of IT security requirements. These requirements are not necessarily the same or even similar to each other's, making the auditing of the ground system security a challenging feat. A combination of standards-based information security management based on the National Institute of Standards and Technology (NIST) Risk Management Framework (RMF), due diligence by the Mission's leadership, and effective collaboration among all elements of the ground system enabled MAVEN to successfully meet NASA's requirements for IT security, and therefore meet Federal Information Security Management Act (FISMA) mandate on the Agency. Throughout the implementation of GRC on MAVEN during the early stages of the mission development, the Project faced many challenges some of which have been identified in this paper. The purpose of this paper is to document these challenges, and provide a brief analysis of the lessons MAVEN learned. The historical information documented herein, derived from an internal pre-launch lessons learned analysis, can be used by current and future missions and organizations implementing and auditing GRC.

  18. Recruitment Lessons Learned from a Tailored Web-Based Health Intervention Project Y.E.A.H. (Young Adults Eating and Active for Health)

    Science.gov (United States)

    Brown, Onikia; Quick, Virginia; Colby, Sarah; Greene, Geoffrey; Horacek, Tanya M.; Hoerr, Sharon; Koenings, Mallory; Kidd, Tandalayo; Morrell, Jesse; Olfert, Melissa; Phillips, Beatrice; Shelnutt, Karla; White, Adrienne; Kattelmann, Kendra

    2015-01-01

    Purpose: Recruiting college students for research studies can be challenging. The purpose of this paper is to describe the lessons learned in the various recruitment strategies used for enrolling college students in a theory-based, tailored, and web-delivered health intervention at 13 US universities. Design/methodology/approach: The…

  19. Pointing the Way to the Future of Project Management: How the Past and Present Point Towards Project Management's Future

    National Research Council Canada - National Science Library

    Ballister, Robert

    2003-01-01

    .... The lessons learned from those projects, coupled with a look at project management history in general, will be checked against a current project management theory to determine if the focus of today's...

  20. Adaptation of lessons learned from the Eurotunnel Project and CDM magnet production to super collider main ring installation

    International Nuclear Information System (INIS)

    Belding, J.; Di Domenico, P.; Gillin, J.; Hahn, W.; Naventi, R.; Nielsen, M.; Seely, M.; Hopkins, J.; Patterson, L.R.

    1994-01-01

    This paper will present preliminary findings from the Phase I Collider Installation contract studies performed by the Bechtel/General Dynamics/Belding Team related to the installation of technical systems for the SSC main ring north and south arcs. Specific focus is given to the adaptation of lessons learned during construction of the Eurotunnel, including equipment and personnel logistics and transportation. The incorporation of Collider Dipole Magnet manufacturing techniques and process methodologies as related to the handling and interconnection of main ring components is also discussed

  1. Naval Surface Warfare Center Dahlgren Division: application of Lean Six Sigma in the pre-award procurement process

    OpenAIRE

    Himes, Kristy M.; Salisbury, Constance M.

    2008-01-01

    Joint Applied Project This Project outlines Lean Six Sigma principles, provides examples of Lean Six Sigma events, and analyzes principles that can be applied to Navy acquisition and contracting. The objective of this project is to: (1) provide an overview of Lean Six Sigma principles in contracting and acquisition; (2) identify Navy contracting processes that have and can be analyzed using Lean Six Sigma principles; (3) explore how Lean Six Sigma can be applied to interpret and implem...

  2. Learning from Iraq and Afghanistan: Four Lessons for Building More Effective Coalitions

    Directory of Open Access Journals (Sweden)

    White Nathan

    2016-06-01

    Full Text Available Despite many tactical and operational successes by brave military and civilian personnel, post-9/11 operations by U.S. led coalitions in Iraq and Afghanistan did not achieve their intended outcomes. Although many efforts are underway by discrete organizations within coalition countries to identify and learn their own lessons from these conflicts, comparatively less attention is paid to broader lessons for successful coalitions. Given that the U.S. and its allies will most certainly form coalitions in the future for a range of different contingency scenarios, these lessons are equally deserving of close examination. This article identifies four interrelated lessons from Iraq and Afghanistan that can be utilized to inform more effective coalition development and employment.

  3. Lessons Learned in Pilot Testing Specialty Consultations to Benefit Individuals with Lower Limb Loss

    Directory of Open Access Journals (Sweden)

    Christine Elnitsky

    2012-12-01

    Full Text Available Telerehabilitation technologies enable the delivery of rehabilitation services from providers to people with disabilities as well as specialty care consultations. This article discusses the barriers experienced when planning and pilot testing a telerehabilitation multi-site specialty consultation for specialists in their medical centers, and the lessons learned. The barriers included integration and participation, coordination across organizational units, and privacy and information security. Lessons learned included the need for collaboration across multiple departments, telerehabilitation equipment back-ups, and anonymous and private communication protocols. Despite delays resulting from coordination at multiple levels of a national organization, we developed a program plan and successfully implemented a pilot test of the southeast region program.  Specialty consultation using telerehabilitation delivery methods requires identifying provider preferences for technological features. Lessons learned could inform development of outpatient telerehabilitation for patients with amputations and studies of patients and providers involved in telerehabilitation.

  4. Measuring online learning systems success: applying the updated DeLone and McLean model.

    Science.gov (United States)

    Lin, Hsiu-Fen

    2007-12-01

    Based on a survey of 232 undergraduate students, this study used the updated DeLone and McLean information systems success model to examine the determinants for successful use of online learning systems (OLS). The results provided an expanded understanding of the factors that measure OLS success. The results also showed that system quality, information quality, and service quality had a significant effect on actual OLS use through user satisfaction and behavioral intention to use OLS.

  5. Building Accessible Educational Web Sites: The Law, Standards, Guidelines, Tools, and Lessons Learned

    Science.gov (United States)

    Liu, Ye; Palmer, Bart; Recker, Mimi

    2004-01-01

    Professional education is increasingly facing accessibility challenges with the emergence of webbased learning. This paper summarizes related U.S. legislation, standards, guidelines, and validation tools to make web-based learning accessible for all potential learners. We also present lessons learned during the implementation of web accessibility…

  6. Unintended Learning in Primary School Practical Science Lessons from Polanyi's Perspective of Intellectual Passion

    Science.gov (United States)

    Park, Jisun; Song, Jinwoong; Abrahams, Ian

    2016-01-01

    This study explored, from the perspective of intellectual passion developed by Michael Polanyi, the unintended learning that occurred in primary practical science lessons. We use the term "unintended" learning to distinguish it from "intended" learning that appears in teachers' learning objectives. Data were collected using…

  7. Involving users with learning difficulties in health improvement: lessons from inclusive learning disability research.

    Science.gov (United States)

    Walmsley, Jan

    2004-03-01

    In this paper the author considers the lessons to be drawn from what is termed "inclusive" learning disability research for user involvement around health improvement. Inclusive learning disability research refers to research where people with learning difficulties (intellectual disability) are involved as active participants, as opposed to passive subjects. There is by now a considerable body of such research, developed over the past 25 years. From the review, the author draws attention to areas which can inform practice in involvement of users in a way that adds value.

  8. Best Practices and Lessons Learned In LANL Approaches to Transportation Security

    Energy Technology Data Exchange (ETDEWEB)

    Drypolcher, Katherine Carr [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-10-24

    Presentation includes slides on Physical Protection of Material in Transit; Graded Approach for Implementation Controls; Security Requirements; LANL Lessons Learned; Shipping Violation; Unmonitored Shipment; Foreign shipment; and the Conclusion.

  9. Overdose prevention for injection drug users: Lessons learned from naloxone training and distribution programs in New York City

    Directory of Open Access Journals (Sweden)

    Nandi Vijay

    2007-01-01

    Full Text Available Abstract Background Fatal heroin overdose is a significant cause of mortality for injection drug users (IDUs. Many of these deaths are preventable because opiate overdoses can be quickly and safely reversed through the injection of Naloxone [brand name Narcan], a prescription drug used to revive persons who have overdosed on heroin or other opioids. Currently, in several cities in the United States, drug users are being trained in naloxone administration and given naloxone for immediate and successful reversals of opiate overdoses. There has been very little formal description of the challenges faced in the development and implementation of large-scale IDU naloxone administration training and distribution programs and the lessons learned during this process. Methods During a one year period, over 1,000 participants were trained in SKOOP (Skills and Knowledge on Opiate Prevention and received a prescription for naloxone by a medical doctor on site at a syringe exchange program (SEP in New York City. Participants in SKOOP were over the age of 18, current participants of SEPs, and current or former drug users. We present details about program design and lessons learned during the development and implementation of SKOOP. Lessons learned described in the manuscript are collectively articulated by the evaluators and implementers of the project. Results There were six primary challenges and lessons learned in developing, implementing, and evaluating SKOOP. These include a political climate surrounding naloxone distribution; b extant prescription drug laws; c initial low levels of recruitment into the program; d development of participant appropriate training methodology; e challenges in the design of a suitable formal evaluation; and f evolution of program response to naloxone. Conclusion Other naloxone distribution programs may anticipate similar challenges to SKOOP and we identify mechanisms to address them. Strategies include being flexible in

  10. Turbine Control System Replacement at NPP NEK; System Specifics, Project Experience and Lessons Learned

    International Nuclear Information System (INIS)

    Mandic, D.; Zilavy, M. J.

    2010-01-01

    constitutes only of soft panels or monitor graphics (all MCB - Main Control Board and its controls are available as graphic images on workstations), while the HMI for FG KFSS includes full scope replica of NEK MCR and MCB. The new PDEH system was installed on two KFSS platforms (BG and FG) in October-November, 2008; pre-outage or on-line field installation work was performed in the January-March 2009 time frame; while the old DEH Mod II was decommissioned and the new plant PDEH system was installed during the outage in April, 2009 and tested with the plant on line in May, 2009. PDEH system improvements and specifics compared to the old DEH system and compared to other similar references will be presented and the most interesting project experience and lessons learned will also be discussed in the paper.(author).

  11. Code of Conduct for wind-power projects - Phases 1 and 2

    International Nuclear Information System (INIS)

    Strub, P.; Ziegler, Ch.

    2008-08-01

    This paper discusses the results of the first two phases of a project concerning wind-power projects. The paper deals with the results of a system analysis, takes a look at lessons learned and presents an appraisal of existing instruments. A system-analysis of wind-power projects is presented with emphasis on social factors and the role of stakeholders. The success factors concerning social acceptance of wind-power projects and their special characteristics are discussed. Lessons learned are examined. Instruments for the sustainable implementation of projects are looked at, in particular with a focus on social acceptance

  12. Lessons learned from women in leadership positions.

    Science.gov (United States)

    Elias, Eileen

    2018-01-01

    Eileen Elias has decades of experience in leadership positions within government and nongovernmental organizations. As the first female Commissioner for Mental Health in the Commonwealth of Massachusetts and the US in the early 1990s, Elias gained experience on navigating gender-based challenges to attain recognized performance outcomes. From lessons learned from women leaders, educate young women entering their careers on attaining leadership positions. Comprehensive research of literature from 2012 through 2017 and interviews with women leaders representing non-Fortune 500 companies including academia, research, non-profit, for-profit, and primary and secondary education. Interviewees included:1.Gail Bassin, Co-Chief Executive Officer and Treasurer, JBS International Inc.2.Jeri Epstein, Executive Director, The Ambit Foundation3.Valerie Fletcher, Executive Director, Institute for Human Centered Design4.Christine James-Brown, President and CEO, Child Welfare League of America5.Daria Mochly-Rosen, PhD, Professor and Fellow, Chemical and Systems Biology, Stanford University School of Medicine6.Eileen O'Keefe, MD, MPH, Clinical Associate Professor and Director, Boston University Health Sciences7.Jeri Shaw, President and Co-Chief Executive Officer, JBS International Inc. A comprehensive understanding of key women leaders' lessons learned and recommendations targeting young women as they assess leadership opportunities in the public or private sectors.

  13. Lessons Learned from Applying Design Thinking in a NASA Rapid Design Study in Aeronautics

    Science.gov (United States)

    McGowan, Anna-Maria; Bakula, Casey; Castner, Raymond

    2017-01-01

    provided valuable experience by allowing team members from different technological backgrounds to work side-by-side instead of dividing into smaller teams, as is frequently done in traditional multidisciplinary design. The team also learned how to work with qualitative data obtained primarily through the 70-plus interviews that were conducted over the course of this project, which was a sharp contrast to using quantitative data with regards to identifying, capturing, analyzing, storing, and recalling the data. When identifying potential interviewees who may have useful contributions to the design subject area, the team found great value in talking to non-traditional users and potential beneficiaries of autonomous aeronautics systems whose impact on the aeronautics autonomy ecosystem is growing swiftly. Finally, the team benefitted from using "sacrificial prototyping," which is a method of rapidly prototyping draft concepts and ideas with the intent of enabling potential users to provide significant feedback early in the design process. This contrasts the more common approach of using expensive prototypes that focus on demonstrating technical feasibility. The unique design approach and lessons learned by the team throughout this process culminated in a final design concept that was quite different than what the team originally assumed would be the design concept initially. A summary of the more usercentered final design concept is also provided.

  14. Facilitating Teamwork with Lean Six Sigma and Web-Based Technology

    Science.gov (United States)

    Krause, Tim

    2009-01-01

    In this article, the author outlines a variety of ways of defining, making explicit, and supporting effective team-based projects through the basic tenets of Lean Six Sigma and the use of Web-based technologies. A combination of Lean Six Sigma and a handful of project management technologies not only help in fostering the communication central to…

  15. Lessons learned enhancing EPICS CA for LANSCE timed and flavored data

    International Nuclear Information System (INIS)

    Hill, Jeffrey O.

    2009-01-01

    A previous paper described an upgrade to EPICS enabling client side tools at LANSCE to receive subscription updates filtered selectively to match a logical configuration of LANSCE beam gates, as configured by the control room. The upgrade required fundamental changes in the EPICS core components. First, the event queue in the EPICS server was upgraded to buffer record (function block) and device specific parameters accessed generically via software interfaces for introspection of 3rd party data. In contrast, event queues in previous versions of EPICS were strictly limited to buffering only value, timestamp, and alarm status tuples. Second, the Channel Access server is being upgraded to filter subscription updates. In this follow on paper some necessary design changes mid-project and the lessons learned during the software development will be described.

  16. Stereotype Threat Effects on Learning From a Cognitively Demanding Mathematics Lesson.

    Science.gov (United States)

    Lyons, Emily McLaughlin; Simms, Nina; Begolli, Kreshnik N; Richland, Lindsey E

    2018-03-01

    Stereotype threat-a situational context in which individuals are concerned about confirming a negative stereotype-is often shown to impact test performance, with one hypothesized mechanism being that cognitive resources are temporarily co-opted by intrusive thoughts and worries, leading individuals to underperform despite high content knowledge and ability (see Schmader & Beilock, ). We test here whether stereotype threat may also impact initial student learning and knowledge formation when experienced prior to instruction. Predominantly African American fifth-grade students provided either their race or the date before a videotaped, conceptually demanding mathematics lesson. Students who gave their race retained less learning over time, enjoyed the lesson less, reported a diminished desire to learn more, and were less likely to choose to engage in an optional math activity. The detrimental impact was greatest among students with high baseline cognitive resources. While stereotype threat has been well documented to harm test performance, the finding that effects extend to initial learning suggests that stereotype threat's contribution to achievement gaps may be greatly underestimated. Copyright © 2017 Cognitive Science Society, Inc.

  17. Lessons Learned from an International e-Training

    International Nuclear Information System (INIS)

    Han, K. W.; Hwang, I. A.; Min, B. J.; Lee, E. J.; Kwon, S. J.

    2008-01-01

    The Nuclear Training and Education Center (NTC) of KAERI is actively participating in the IAEA's Asian Network for Education in Nuclear Technology (ANENT), focusing on web-based nuclear education and training. The center has contributed, in particular, to the development of the ANENT web-portal including cyber platform, and making relevant courses available on it. As part of this effort, the first e-training was attempted with a course on energy planning jointly by NTC of KAERI, and Planning and Economic Studies Section (PESS) and Nuclear Knowledge Management Section (NKM) of IAEA. The objective of the e-training was: - to introduce the use of an IAEA model named as SIMPACTS (Simplified approach for estimating environmental impacts from electricity generation) for assessing environmental impacts from various electricity generations; - to identify real problems as they are and consider solutions for an effective implementation of e-training courses. SIMPACTS deals with sub-programs, i.e. AirPacts for a non-radiological air pollution, NukPacts for a radiological air pollution, HydroPacts for project impacts, and LiquidPacts for a radiological water pollution. This paper discusses lessons learned from the perspective of the e-training host and an ANENT member

  18. Approaches to quality improvement in nursing homes: Lessons learned from the six-state pilot of CMS's Nursing Home Quality Initiative

    Directory of Open Access Journals (Sweden)

    Palmer Laura

    2003-05-01

    Full Text Available Abstract Background In November 2002, the Centers for Medicare & Medicaid Services (CMS launched a Nursing Home Quality Initiative that included publicly reporting a set of Quality Measures for all nursing homes in the country, and providing quality improvement assistance to nursing homes nationwide. A pilot of this initiative occurred in six states for six months prior to the launch. Methods Review and analysis of the lessons learned from the six Quality Improvement Organizations (QIOs that led quality improvement efforts in nursing homes from the six pilot states. Results QIOs in the six pilot states found several key outcomes of the Nursing Home Quality Initiative that help to maximize the potential of public reporting to leverage effective improvement in nursing home quality of care. First, public reporting focuses the attention of all stakeholders in the nursing home industry on achieving good quality outcomes on a defined set of measures, and creates an incentive for partnership formation. Second, publicly reported quality measures motivate nursing home providers to improve in certain key clinical areas, and in particular to seek out new ways of changing processes of care, such as engaging physicians and the medical director more directly. Third, the lessons learned by QIOs in the pilot of this Initiative indicate that certain approaches to providing quality improvement assistance are key to guiding nursing home providers' desire and enthusiasm to improve towards a using a systematic approach to quality improvement. Conclusion The Nursing Home Quality Initiative has already demonstrated the potential of public reporting to foster collaboration and coordination among nursing home stakeholders and to heighten interest of nursing homes in quality improvement techniques. The lessons learned from this pilot project have implications for any organizations or individuals planning quality improvement projects in the nursing home setting.

  19. Job Oriented Training ’Lessons Learned

    Science.gov (United States)

    2008-11-01

    Job Oriented Training ’Lessons Learned’ Job Oriented Training (JOT), een vorm van trainen waarbij de cursist zelfstandig, zonder theorie vooraf...39 77 lnfo-DenV@tno.nl TNO-rapportnummer TNO-DV 2008 A447 Opdrachtnummer Datum november 2008 Auteur (s) drs. H.E. Stubbe dr. A.H. van der...onderlinge discussie over achterliggende overwegingen te stimuleren. Zij hebben op dat moment nog geen theorie aangeboden gekregen en zijn niet op de hoogte

  20. Lessons learned: Experiences with Integrated Safeguards in Norway

    International Nuclear Information System (INIS)

    Sekse, T.; Hornkjol, S.

    2010-01-01

    Integrated safeguards (IS) was implemented in Norway in 2002 as one of the first countries in the world. The implementation of IS has provided both advantages and disadvantages for Norway. Lessons learned will be discussed. The concept of unannounced inspections under the integrated safeguards regime compared to traditional safeguards is one of the major issues. Small users with depleted uranium as shielding containers and the effort used to safeguard them is an aspect of this issue. Recently there has been an interest from the IAEA to investigate the historical boundaries between a research reactor site and a neighboring defense research site. The paper will address this issue as a part of the implementation of IS. Lately, we have seen that several commercial parties have started research on nuclear fuel cycle related projects. This raises some questions concerning what to declare under Article 2 of the Additional Protocol (AP). Today anyone with a computer connected to the internet could carry out research amenable to declaration under the AP. This paper will discuss this issue. (author)

  1. Creating Small Learning Communities: Lessons from the Project on High-Performing Learning Communities about "What Works" in Creating Productive, Developmentally Enhancing, Learning Contexts

    Science.gov (United States)

    Felner, Robert D.; Seitsinger, Anne M.; Brand, Stephen; Burns, Amy; Bolton, Natalie

    2007-01-01

    Personalizing the school environment is a central goal of efforts to transform America's schools. Three decades of work by the Project on High Performance Learning Communities are considered that demonstrate the potential impact and importance of the creation of "small learning environments" on student motivation, adjustment, and well-being.…

  2. Lean Manufacturing measurement: The relationships between Lean activities and Lean metrics

    Directory of Open Access Journals (Sweden)

    Diego Fernando Manotas Duque

    2007-01-01

    Full Text Available Medición en Lean Manufacturing: Relaciones entre Actividades Lean y Métricas Lean Lean Manufacturing fue desarrollada por Toyota para satisfacer sus necesidades específicas en un mercado restringido y en tiempos de estrechez económica. Estos conceptos han sido estudiados y se ha comprobado su aplicabilidad en una amplia variedad de industrias. El objetivo de este artículo es el de integrar un conjunto de métricas que han sido propuestas por diferentes autores, de tal manera que sean consistentes con las etapas y elementos de implementaciones de Lean Manufacturing. Para lograrlo se presentan dos marcos de referencia para implementaciones Lean y los principales factores de éxito se utilizan como base para proponer métricas que identifiquen el avance en estos factores. Posteriormente se propone una tabla que cruza el impacto de las “Actividades Lean” sobre las métricas, postulando que muchos de los supuestos a priori sobre estos impactos deberían ser precisos. Finalmente se proponen algunas ideas para proyectos de investigación hacia el futuro y posibles extensiones de las aplicaciones propuestas aquí.

  3. Dipping Your Toes into Evaluation in Five Easy Steps: Tips, Tricks, and Lessons Learned

    Science.gov (United States)

    Martin, A. M.

    2013-04-01

    With limited funding, staffing, and resources for STEM education projects, the push for rigorous evaluation of our efforts offers up significant challenges, but opportunities as well. Evaluative thinking can enrich and improve the entire life cycle of an education, communication, or outreach project, and can take many forms other than a final, summative evaluation report. The community of attendees at the Astronomical Society of the Pacific will share an abundance of evaluation expertise, approaches, and results, but where does one turn if evaluation is a new concept or responsibility? This session will briefly highlight five tips, tricks, and lessons learned from the perspective of a novice and from a NASA project new to evaluation. The resources and ideas shared in the session will represent the concrete advice and driving ideas that put the author on firmer evaluative footing. Themes explored will include: (1) strategies for incorporating evaluative thinking early in the development of a project and throughout its life cycle; (2) the benefit of taking the time to elucidate a program's logic model of theory of action; (3) linking program activities to outcomes that are SMART (specific, measurable, attainable, relevant, and timely); (4) working with an external or internal evaluator; and (5) taking evaluation beyond the formal, final report. Finally, we'll close with resources to help individuals and their organizations learn more about evaluation and build their evaluation capacity.

  4. TMI-2 Lessons Learned Task Force. Final report

    International Nuclear Information System (INIS)

    1979-10-01

    In its final report reviewing the Three Mile Island accident, the TMI-2 Lessons Learned Task Force has suggested change in several fundamental aspects of basic safety policy for nuclear power plants. Changes in nuclear power plant design and operations and in the regulatory process are discussed in terms of general goals. The appendix sets forth specific recommendations for reaching these goals

  5. Lessons Learned

    Directory of Open Access Journals (Sweden)

    Amanda Phelan BNS, MSc, PhD

    2015-03-01

    Full Text Available The public health nurses’ scope of practice explicitly includes child protection within their role, which places them in a prime position to identify child protection concerns. This role compliments that of other professions and voluntary agenices who work with children. Public health nurses are in a privileged position as they form a relationship with the child’s parent(s/guardian(s and are able to see the child in its own environment, which many professionals cannot. Child protection in Ireland, while influenced by other countries, has progressed through a distinct pathway that streamlined protocols and procedures. However, despite the above serious failures have occurred in the Irish system, and inquiries over the past 20 years persistently present similar contributing factors, namely, the lack of standardized and comprehensive service responses. Moreover, poor practice is compounded by the lack of recognition of the various interactional processes taking place within and between the different agencies of child protection, leading to psychological barriers in communication. This article will explore the lessons learned for public health nurses practice in safeguarding children in the Republic of Ireland.

  6. Planning, managing and organizing the decommissioning of nuclear facilities: Lessons learned

    International Nuclear Information System (INIS)

    2004-05-01

    This publication is intended to encourage the development and improvement of decommissioning planning and management techniques, with the focus on organizational aspects, reduce the duplication of efforts by different parties by transfer of experience and know-how, and provide useful results for those Member States planning or implementing decommissioning projects. In general it can be stated that any decommissioning project can be completed without any deleterious effects on the safety of the workforce and the public or any identifiable impact on the environment. However, timeliness and cost-effectiveness are not always optimal. It has been noted on several occasions that the major weakness in decommissioning projects (as well as in other industrial projects) is often not the lack of technologies, but rather poor planning and management. This publication intends to stimulate awareness of the need for early and efficient planning and to foster developments in management and organization in association with planned or ongoing decommissioning projects. A companion report on Organization and Management for Decommissioning of Large Nuclear Facilities was published by the IAEA in 2000 (Technical Report Series (TRS) No. 399). That TRS provides generic guidance on organizational and management aspects. This TECDOC is complementary to the existing report in that it highlights practical experience - in particular, typical issues, evidence of poor management, undue delays, and lack of timely funding - and distils lessons learned from this experience

  7. Lean health care: what can hospitals learn from a world-class automaker?

    Science.gov (United States)

    Kim, Christopher S; Spahlinger, David A; Kin, Jeanne M; Billi, John E

    2006-05-01

    With health care costs continuing to rise, a variety of process improvement methodologies have been proposed to address the reported inefficiencies in health care delivery. Lean production is one such method. The management philosophy and tools of lean production come from the manufacturing industry, where they were pioneered by Toyota Motor Corporation, which is viewed as the leader in utilizing these performance improvement methods. Lean has already enjoyed tremendous success in improving quality and efficiency in both the manufacturing and the service sector industries. Health care systems have just begun to utilize lean methods, with reports of improvements just beginning to appear in the literature. We describe some of the basic philosophy and principles of lean production methods and how these concepts can be applied in the health care environment. We describe some of the early success stories and ongoing endeavors of lean production in various health care organizations. We believe the hospital is an ideal setting for use of the lean production method, which could significantly affect how health care is delivered to patients. We conclude by discussing some of the potential challenges in introducing and implementing lean production methods in the health care environment. Lean production is a novel approach to delivering high-quality and efficient care to patients, and we believe that the health care sector can anticipate the same high level of success that the manufacturing and service industries have achieved using this approach. Hospitalists are primed to take action in delivering care of greater quality with more efficiency by applying these new principles in the hospital setting. (c) 2006 Society of Hospital Medicine.

  8. LEAN PRACTICES FOR PRODUCT DEVELOPMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Guilherme Luz Tortorella

    2015-06-01

    Full Text Available Lean product development (LPD is an approach that comprises lean principles and management practices that aim to reduce waste and improve operational effectiveness throughout the entire value stream in continuous improvement endless journey. Due to that, the ability to innovate, change and learn continuously is a key element in order to minimize product development problems. Several LPD techniques are presented in the literature as possible enablers for lean implementation. However, little has been known about the impact of these enablers on the problems related to product development processes. Thus, this paper aims to examine the relationship between five LPD practices’ constructs and the occurrence frequency of eleven LPD problems’ constructs in companies that are implementing lean. Moreover, the identification of relevant relationships between LPD practices’ and problems’ constructs may contribute to specify the contexts in which problems are expected to occur. The study sample comprises sixty four companies already undergoing lean implementation both in shop floor and offices area. The results indicate that the same practices’ constructs, which are deemed as influential for minimizing LPD problems, present different relationship intensities among them.

  9. Opening and operating a nuclear disposal facility: lessons learned in public outreach

    International Nuclear Information System (INIS)

    Hurtt, D.; Marshall, A.; Antiporta, M.; West, C.

    2002-01-01

    Addressing the issue of nuclear waste is no small task for professional communicators. Communications need to strike the right balance between presenting scientific facts and responding to public issues, describing risks without creating unnecessary anxiety, and listening and addressing public concerns. The U.S. Department of Energy's (DOE) Carlsbad Field Office (CBFO), which operates the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, has more than 25 years of experience in communicating about deep geologic (2 150 feet) disposal of nuclear waste. While a single formula for success is unrealistic, the CBFO has identified 14 steps in its stakeholder outreach program that together provide a model for similar projects dealing with controversial issues. Bottom line, the lesson is to listen, learn and adapt. (author)

  10. Sustainable urban development of metropolitan Johannesburg: The lessons learned from international practice

    Directory of Open Access Journals (Sweden)

    Mosha A.C.

    2004-01-01

    Full Text Available This paper consists of an overview of programmes supporting sustainable planning and management in the City of Johannesburg one of the most important social and economic hubs of the transitional Republic of South Africa. Following from this is an analysis of the experience identified as most appropriate for Johannesburg City and its metropolitan region (Gauteng. This case study is used to highlight efforts and lessons learned from the international project "Designing, Implementing and Measuring Sustainable Urban Development" (DIMSUD which have intended to contribute to new solutions for sustainable urban development through a collaborative multi-disciplinary, and participatory approach combining research, urban design, and capacity building. DIMSUD (http://sustainability.ethz.ch is carried out jointly by the Swiss Federal Institute of Technology (ETH Massachusetts Institute of Technology (MIT, Chalmers University of Technology (Sweden, University of Botswana, University of the Witwatersrand (South Africa and the Catholic University of Santiago de Chile. Another partner was the United Nations University (UNU at Tokyo. The project has enabled a global overview of core problems, providing a synthesis of realizable strategies and offering both a scientific forum and an "urban field laboratory" for joint learning. The strategies developed will not only help improve the conditions in the case study cities (Gaborone Johannesburg, Santiago de Chile, but will also provide working examples so that other cities can learn from and adapt and adopt appropriate "best practices".

  11. Lessons Learned from FUSRAP

    Energy Technology Data Exchange (ETDEWEB)

    Castillo, Darina [U.S. Department of Energy, Office of Legacy Management; Carpenter, Cliff [U.S. Department of Energy, Office of Legacy Management; Miller, Michele [Navarro Research and Engineering

    2016-03-06

    The US DOE Office of Legacy Management (LM) is the long-term steward for 90 sites remediated under numerous regulatory regimes including the Formerly Utilized Sites Remedial Action Program (FUSRAP) sites. In addition, LM holds considerable historical information, gathered in the 1970s, to determine site eligibility for remediation under FUSRAP. To date, 29 FUSRAP sites are in LM’s inventory of sites for long-term surveillance and maintenance (LTS&M), and 25 are with the US Army Corps of Engineers (USACE) for remediation or in the process of being transitioned to LM. It is forecasted that 13 FUSRAP sites will transfer from the USACE to LM over the next 10 years; however, the timing of the transfers is strongly dependent upon federal funding of the ongoing remedial actions. Historically, FUSRAP sites were generally cleaned up for “unrestricted” industrial use or remediated to the “cleanup standards” at that time, and their use remained unchanged. Today, these sites as well as the adjacent properties are now changing or envisioned to have changes in land use, typically from industrial to commercial or residential uses. The implication of land-use change affects DOE’s LTS&M responsibility for the sites under LM stewardship as well as the planning for the additional sites scheduled to transition in time. Coinciding with land-use changes at or near FUSRAP sites is an increased community awareness of these sites. As property development increases near FUSRAP sites, the general public and interested stakeholders regularly inquire about the sufficiency of cleanups that impact their neighborhoods and communities. LM has used this experience to address a series of lessons learned to improve our program management in light of the changing conditions of our sites. We describe these lessons learned as (1) improved stakeholder relations, (2) enhanced LTS&M requirements for the sites, and (3) greater involvement in the transition process.

  12. Project Planning and Implementation: Lessons Learned From the AQBMP Project

    National Research Council Canada - National Science Library

    1997-01-01

    ...). This NSRP report is funded as an addendum to the Air Quality Best Management Practices (AQBMP) project (N1 -944). The AQBMP project was completed using an intensive project planning process using a variety of quality management tools...

  13. The role of failure/problems in engineering: A commentary of failures experienced - lessons learned

    Science.gov (United States)

    Ryan, R. S.

    1992-03-01

    The written version of a series of seminars given to several aerospace companies and three NASA centers are presented. The results are lessons learned through a study of the problems experienced in 35 years of engineering. The basic conclusion is that the primary cause of problems has not been mission technologies, as important as technology is, but the neglect of basic principles. Undergirding this is the lack of a systems focus from determining requirements through design, verification, and operations phases. Many of the concepts discussed are fundamental to total quality management (TQM) and can be used to augment this product enhanced philosophy. Fourteen principles are addressed with problems experienced and are used as examples. Included is a discussion of the implication of constraints, poorly defined requirements, and schedules. Design guidelines, lessons learned, and future tasks are listed. Two additional sections are included that deal with personal lessons learned and thoughts on future thrusts (TQM).

  14. The role of failure/problems in engineering: A commentary of failures experienced - lessons learned

    Science.gov (United States)

    Ryan, R. S.

    1992-01-01

    The written version of a series of seminars given to several aerospace companies and three NASA centers are presented. The results are lessons learned through a study of the problems experienced in 35 years of engineering. The basic conclusion is that the primary cause of problems has not been mission technologies, as important as technology is, but the neglect of basic principles. Undergirding this is the lack of a systems focus from determining requirements through design, verification, and operations phases. Many of the concepts discussed are fundamental to total quality management (TQM) and can be used to augment this product enhanced philosophy. Fourteen principles are addressed with problems experienced and are used as examples. Included is a discussion of the implication of constraints, poorly defined requirements, and schedules. Design guidelines, lessons learned, and future tasks are listed. Two additional sections are included that deal with personal lessons learned and thoughts on future thrusts (TQM).

  15. Improving Immunization Rates Using Lean Six Sigma Processes: Alliance of Independent Academic Medical Centers National Initiative III Project.

    Science.gov (United States)

    Hina-Syeda, Hussaini; Kimbrough, Christina; Murdoch, William; Markova, Tsveti

    2013-01-01

    Quality improvement education and work in interdisciplinary teams is a healthcare priority. Healthcare systems are trying to meet core measures and provide excellent patient care, thus improving their Hospital Consumer Assessment of Healthcare Providers & Systems scores. Crittenton Hospital Medical Center in Rochester Hills, MI, aligned educational and clinical objectives, focusing on improving immunization rates against pneumonia and influenza prior to the rates being implemented as core measures. Improving immunization rates prevents infections, minimizes hospitalizations, and results in overall improved patient care. Teaching hospitals offer an effective way to work on clinical projects by bringing together the skill sets of residents, faculty, and hospital staff to achieve superior results. WE DESIGNED AND IMPLEMENTED A STRUCTURED CURRICULUM IN WHICH INTERDISCIPLINARY TEAMS ACQUIRED KNOWLEDGE ON QUALITY IMPROVEMENT AND TEAMWORK, WHILE FOCUSING ON A SPECIFIC CLINICAL PROJECT: improving global immunization rates. We used the Lean Six Sigma process tools to quantify the initial process capability to immunize against pneumococcus and influenza. The hospital's process to vaccinate against pneumonia overall was operating at a Z score of 3.13, and the influenza vaccination Z score was 2.53. However, the process to vaccinate high-risk patients against pneumonia operated at a Z score of 1.96. Improvement in immunization rates of high-risk patients became the focus of the project. After the implementation of solutions, the process to vaccinate high-risk patients against pneumonia operated at a Z score of 3.9 with a defects/million opportunities rate of 9,346 and a yield of 93.5%. Revisions to the adult assessment form fixed 80% of the problems identified. This process improvement project was not only beneficial in terms of improved quality of patient care but was also a positive learning experience for the interdisciplinary team, particularly for the residents. The

  16. SciNet: Lessons Learned from Building a Power-efficient Top-20 System and Data Centre

    International Nuclear Information System (INIS)

    Loken, Chris; Gruner, Daniel; Groer, Leslie; Peltier, Richard; Bunn, Neil; Craig, Michael; Henriques, Teresa; Dempsey, Jillian; Yu, Ching-Hsing; Chen, Joseph; Dursi, L Jonathan; Chong, Jason; Northrup, Scott; Pinto, Jaime; Knecht, Neil; Van Zon, Ramses

    2010-01-01

    SciNet, one of seven regional HPC consortia operating under the Compute Canada umbrella, runs Canada's first and third fastest computers (as of June 2010) in a state-of-the-art, highly energy-efficient datacentre with a Power Usage Effectiveness (PUE) design-point of 1.16. Power efficiency, computational 'bang for the buck' and system capability for a handful of flagship science projects were important criteria in choosing the nature of the computers and the data centre itself. Here we outline some of the lessons learned in putting together the systems and the data centre that hosts Canada's fastest computer to date.

  17. Integración conceptual Green-Lean en el diseño, planificación y construcción de proyectos Green-Lean conceptual integration in the project design, planning and construction

    Directory of Open Access Journals (Sweden)

    Patricia Martinez

    2009-01-01

    begin to be managed by all the agents involved: engineers, architects, owners, among others. Sustainability concept, being of general character, has remained in a conceptual context, becoming difficult the development of tools that facilitate its consideration through the entire project life cycle. This study had as purpose to integrate the philosophies of Sustainable Construction, or Green Building, and Lean Construction, the latter employee as the necessary complement to give an analysis baseline focused on the production management. The design, planning and construction stages were defined as the enclosed life cycle, being determined integration vectors by means of the morphological analysis and cross-impact matrix. The vectors with direct relationship for the implementation of the Green-Lean integration were determined. As implementation tool of the Green-Lean integration, Constructability was used which allowed sequencing the construction processes. This conceptual exercise was only applied at design level. As a result, at conceptual level was stated that the tools applied in the project management (Lean Construction and Constructability, give a sound support for the implementation, and future application, of Sustainability criteria in the processes and stages involving the whole project life cycle.

  18. Achieving Balance: Lessons Learned from University and College Presidents

    Science.gov (United States)

    Havice, Pamela A.; Williams, Frankie K.

    2005-01-01

    This study investigated strategies used by college and university presidents in balancing their professional and personal lives. The conceptual framework for this study comes from the work of Schein (1985, 1992). Lessons learned and words of wisdom from these presidents can enhance leadership effectiveness at all levels in higher education.

  19. Building Energy-Efficient Schools in New Orleans: Lessons Learned (Brochure)

    Energy Technology Data Exchange (ETDEWEB)

    2011-12-01

    This case study presents the lessons learned from incorporating energy efficiency in the rebuilding and renovating of New Orleans K-12 schools after Hurricanes Katrina and Rita. Hurricane Katrina was the largest natural disaster in the United States, striking the Gulf Coast on August 29, 2005, and flooding 80% of New Orleans; to make matters worse, the city was flooded again only three weeks later by the effects of Hurricane Rita. Many of the buildings, including schools, were heavily damaged. The devastation of schools in New Orleans from the hurricanes was exacerbated by many years of deferred school maintenance. This case study presents the lessons learned from incorporating energy efficiency in the rebuilding and renovating of New Orleans K-12 schools after Hurricanes Katrina and Rita. The experiences of four new schools-Langston Hughes Elementary School, Andrew H. Wilson Elementary School (which was 50% new construction and 50% major renovation), L.B. Landry High School, and Lake Area High School-and one major renovation, Joseph A. Craig Elementary School-are described to help other school districts and design teams with their in-progress and future school building projects in hot-humid climates. Before Hurricane Katrina, New Orleans had 128 public schools. As part of the recovery planning, New Orleans Public Schools underwent an assessment and planning process to determine how many schools were needed and in what locations. Following a series of public town hall meetings and a district-wide comprehensive facility assessment, a Master Plan was developed, which outlined the renovation or construction of 85 schools throughout the city, which are expected to be completed by 2017. New Orleans Public Schools expects to build or renovate approximately eight schools each year over a 10-year period to achieve 21st century schools district-wide. Reconstruction costs are estimated at nearly $2 billion.

  20. Lessons Learned From 104 Years of Mobile Observatories

    Science.gov (United States)

    Miller, S. P.; Clark, P. D.; Neiswender, C.; Raymond, L.; Rioux, M.; Norton, C.; Detrick, R.; Helly, J.; Sutton, D.; Weatherford, J.

    2007-12-01

    As the oceanographic community ventures into a new era of integrated observatories, it may be helpful to look back on the era of "mobile observatories" to see what Cyberinfrastructure lessons might be learned. For example, SIO has been operating research vessels for 104 years, supporting a wide range of disciplines: marine geology and geophysics, physical oceanography, geochemistry, biology, seismology, ecology, fisheries, and acoustics. In the last 6 years progress has been made with diverse data types, formats and media, resulting in a fully-searchable online SIOExplorer Digital Library of more than 800 cruises (http://SIOExplorer.ucsd.edu). Public access to SIOExplorer is considerable, with 795,351 files (206 GB) downloaded last year. During the last 3 years the efforts have been extended to WHOI, with a "Multi-Institution Testbed for Scalable Digital Archiving" funded by the Library of Congress and NSF (IIS 0455998). The project has created a prototype digital library of data from both institutions, including cruises, Alvin submersible dives, and ROVs. In the process, the team encountered technical and cultural issues that will be facing the observatory community in the near future. Technological Lessons Learned: Shipboard data from multiple institutions are extraordinarily diverse, and provide a good training ground for observatories. Data are gathered from a wide range of authorities, laboratories, servers and media, with little documentation. Conflicting versions exist, generated by alternative processes. Domain- and institution-specific issues were addressed during initial staging. Data files were categorized and metadata harvested with automated procedures. With our second-generation approach to staging, we achieve higher levels of automation with greater use of controlled vocabularies. Database and XML- based procedures deal with the diversity of raw metadata values and map them to agreed-upon standard values, in collaboration with the Marine Metadata

  1. Perceived Advantages of 3D Lessons in Constructive Learning for South African Student Teachers Encountering Learning Barriers

    Science.gov (United States)

    de Jager, Thelma

    2017-01-01

    Research shows that three-dimensional (3D)-animated lessons can contribute to student teachers' effective learning and comprehension, regardless of the learning barriers they experience. Student teachers majoring in the subject Life Sciences in General Subject Didactics viewed 3D images of the heart during lectures. The 3D images employed in the…

  2. Lessons Learned from the Puerto Rico Battery Energy Storage System

    Energy Technology Data Exchange (ETDEWEB)

    Boyes, John D.; De Anda, Mindi Farber; Torres, Wenceslao

    1999-08-11

    The Puerto Rico Electric Power Authority (PREPA) installed a battery energy storage system in 1994 at a substation near San Juan, Puerto Rico. It was patterned after two other large energy storage systems operated by electric utilities in California and Germany. The Puerto Rico facility is presently the largest operating battery storage system in the world and has successfully provided frequency control, voltage regulation, and spinning reseme to the Caribbean island. The system further proved its usefulness to the PREPA network in the fall of 1998 in the aftermath of Hurricane Georges. However, the facility has suffered accelerated cell failures in the past year and PREPA is committed to restoring the plant to full capacity. This represents the first repowering of a large utility battery facility. PREPA and its vendors and contractors learned many valuable lessons during all phases of project development and operation, which are summarized in this paper.

  3. Lessons offered, lessons learned: reflections on how doing family therapy can affect therapists.

    Science.gov (United States)

    Heatherington, Laurie; Friedlander, Myrna L; Diamond, Gary M

    2014-08-01

    Only in working conjointly with couples and families do therapists literally witness clients struggling to improve their most intimate relationships. In writing this article, we realized that, in true systemic fashion, not only have many of our clients benefited from working with us, but also we have learned some invaluable lessons from them. Indeed, practicing couple and family therapy gives therapists many opportunities to learn about themselves, especially when it is done thoughtfully. In this article, we reflect on myriad ways in which couples and family therapy has affected each of us personally-as individuals, as partners, as parents, as adult children in our families of origin, and as educators. © 2014 Wiley Periodicals, Inc.

  4. Combat Trauma Lessons Learned from Military Operations of 2001 - 2013

    Science.gov (United States)

    2015-03-09

    suspected tension pneumothorax  Longer needle for needle decompression  Lateral approach for needle decompression  Vented chest seals for open...Defense Health Board Combat Trauma Lessons Learned from Military Operations of 2001-2013 March 9, 2015 OFFICE OF THE ASSISTANT SECRETARY OF...

  5. Moving Forward with Lessons Learned About Long-term Radioactive Waste Management

    Energy Technology Data Exchange (ETDEWEB)

    Atherton, Elizabeth; Dalton, John [UK Nirex Ltd., Harwell (United Kingdom)

    2006-09-15

    A range of lessons have been identified from previous attempts to implement long term radioactive waste management policy in the UK and internationally. Many of these relate to the way the decision-making process is undertaken and the fact that there needs to be an open, transparent process that enables continuous stakeholder involvement. Nirex believes that using the SEA and EIA frameworks will help to incorporate the lessons learned into the future decision-making process relating to long-term radioactive waste management.

  6. Moving Forward with Lessons Learned About Long-term Radioactive Waste Management

    International Nuclear Information System (INIS)

    Atherton, Elizabeth; Dalton, John

    2006-01-01

    A range of lessons have been identified from previous attempts to implement long term radioactive waste management policy in the UK and internationally. Many of these relate to the way the decision-making process is undertaken and the fact that there needs to be an open, transparent process that enables continuous stakeholder involvement. Nirex believes that using the SEA and EIA frameworks will help to incorporate the lessons learned into the future decision-making process relating to long-term radioactive waste management

  7. Lessons Learned from Implementing National Nuclear Safety Knowledge Platforms

    International Nuclear Information System (INIS)

    Simo, A.

    2016-01-01

    The Integrated Nuclear Security Advisory Services (INSServ) took place in Cameroon from 21st to 25th April 2014 and the Integrated Regulatory Review Service (IRRS) from 12th to 21st October 2014. This was after the government requested the Director General of International Atomic Energy Agency (IAEA) through an official correspondence on 11th June 2013, for these missions. The main objective was to further improve the effectiveness of the Cameroon governmental, legal and regulatory framework for safety and security. Revision of the legal and regulatory framework so that all international safety and security standards are addressed in laws and statutes have been done with documents downloaded from Nuclear portal sites found in GNSSN. Establishment and implementation of integrated management systems by NRPA is being done with documentation under the National Nuclear Portal with lessons learned from the IAEA review missions. The regulatory documents have been uploaded on the platform and can be accessed through FNRBA and NRPA website (www.anrp.cm). UN organizations implementing projects in Cameroon are also linked to the platform. The action plans and progress reports for IAEA/AFRA projects are also available. Moreover, NRPA regulatory activities and licensing sources are available on this platform.

  8. The Art of Lean Software Development A Practical and Incremental Approach

    CERN Document Server

    Hibbs, Curt; Sullivan, Mike

    2009-01-01

    This succinct book explains how to you can apply the practices of Lean software development to dramatically increase productivity and quality. Lean principles are being applied successfully to product design, engineering, the supply chain, and now software development. You'll learn how to adopt Lean practices one at a time, rather than taking on the entire methodology at once. At each stage, you'll see significant, measurable results.

  9. Development of an HIV Prevention Videogame: Lessons Learned

    OpenAIRE

    Kimberly Hieftje; Lynn E. Fiellin; Tyra Pendergrass; Lindsay R Duncan

    2016-01-01

    The use of videogames interventions is becoming an increasingly popular and effective strategy in disease prevention and health promotion; however, few health videogame interventions have been scientifically rigorously evaluated for their efficacy. Moreover, few examples of the formative process used to develop and evaluate evidence-based health videogame interventions exist in the scientific literature. The following paper provides valuable insight into the lessons learned during the process...

  10. The Control Room Upgrade in Oskarshamn 2 Modernization Project Lesson Learned from Ongoing Human Factor design

    International Nuclear Information System (INIS)

    Thomas, Gunnarsson; Magnus, Eliasson

    2011-01-01

    Due to recent changes in Swedish commercial nuclear safety system requirements, OKG decided to make the changes required by the new safety requirements, apply for a 30-year license extension, and to concurrently make changes for a major power uprate; this project is called the Plant Life Extension project (PLEX). It was decided, in addition to several plant modifications, to re build the old control room to a new modern screen-based control room located in the same space as the old one, and with the same number of operators. This paper explains the approach taken when modernizing the control room as a part of the Oskarshamn 2 Modernization project PLEX, the results, and the lessons learned from this ongoing work. The combination of changes results in a modernization project that is expected to increase output power by approximately 50 MWe through increased efficiency and to result in an increase in thermal power from 1800 MWt to 2300 MWt (28%) and electrical power from 620 MWe to 840 MWe due to the power uprate. The license to operate OKG2 expires in 2012 The PLEX project is one of the most ambitious nuclear power plant modernization projects ever implemented, world-wide. The application of human factors engineering (HFE) and control room and HSI design is a complex challenge. The original main control room from 1975 in Oskarshamn 2, was quite compact and provided a fairly good overview of the process. New requirements for enhanced safety and other design changes in the process systems and instrumentation led to a step-wise installation of new information and control equipment in the control room. Since the control room was quite limited in space, the control room grew larger, and the new equipment was installed farther away from the operator workplaces into an adjacent control room. This was even the case for the new safety systems. These systems were functioning well separately as such, but in some cases their interfaces were inconsistent, leading to increased

  11. Managing a project's legacy: implications for organizations and project management

    Science.gov (United States)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  12. Lean and Efficient Software: Whole-Program Optimization of Executables

    Science.gov (United States)

    2015-09-30

    Lean and Efficient Software: Whole-Program Optimization of Executables” Project Summary Report #5 (Report Period: 7/1/2015 to 9/30/2015...TYPE 3. DATES COVERED 00-00-2015 to 00-00-2015 4. TITLE AND SUBTITLE Lean and Efficient Software: Whole-Program Optimization of Executables 5a...unclassified c. THIS PAGE unclassified Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 Lean and Efficient Software: Whole-Program

  13. Session: Bat ecology related to wind development and lessons learned about impacts on bats from wind development

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, Greg; Kunz, Thomas

    2004-09-01

    This session at the Wind Energy and Birds/Bats workshop consisted of two paper presentations followed by a discussion/question and answer period. It was the first of the sessions to shift the focus to the issue of wind energy development's impacts specifically to bats. The presentations discussed lessons that have been learned regarding direct and indirect impacts on bats and strategies planned to address such issues. Presenters addressed what the existing science demonstrates about land-based wind turbine impacts on bats, including: mortality, avoidance, direct habitat impacts, species and numbers killed, per turbine rates/per MW generated, and impacts on threatened and endangered species. They discussed whether there is sufficient data for wind turbines and bat impacts for projects in the eastern US, especially on ridge tops. Finally, the subject of offshore impacts on bats was briefly addressed, including what lessons have been learned in Europe and how these can be applied in the U S. Paper one, by Greg Johnson, was titled ''A Review of Bat Impacts at Wind Farms in the US''. Paper two, by Thomas Kunz, was titled ''Wind Power: Bats and Wind Turbines''.

  14. Evolutionary Acquisition of the Global Command and Control System: Lessons Learned

    National Research Council Canada - National Science Library

    Wallis, Johnathan

    1998-01-01

    This paper summarizes a "lessons learned" study that reviews DoD's approach to managing the GCCS program on behalf on the Assistant Secretary of Defense for Command, Control, Communications, and Intelligence (ASD/C3I...

  15. Safety Requirements / Design Criteria for SFR. Lessons Learned from the Fukushima Dai-ichi Accident

    International Nuclear Information System (INIS)

    Yllera, Javier

    2013-01-01

    After the Fukushima event (March 2011) the IAEA has started an action to review and revise, if necessary, all Safety Standards to take into consideration the lessons learned from the accident. The Safety Standards that need to be revised have been identified. A Prioritization Approach has been established: The first priority is to review safety guides applicable for NPPs and spent fuel storage with focus on the measures for the prevention and mitigation of severe accident due to external hazards - ● Regulatory framework, Safety assessment, Management system, Radiation protection and Emergency Preparedness and response; ● Sitting, Design, Operation of NPPs ● Decommissioning and Waste Management. Original sources for lessons learned: IAE fact Finding Mission, Japan´s report to the Ministerial Conference, INSAG Report, etc. Later, other lesson sources considered

  16. The Implementation of Lesson Study in English Language Learning: A Case Study

    Directory of Open Access Journals (Sweden)

    Wakhid Nashruddin

    2016-12-01

    Full Text Available Lesson Study as a growing interest in the education world has attracted educators, experts, and professionals in the area to make use of it in improving the lessons—it also happens in Indonesia. Originally applied in the teaching of mathematics in Japan, now it turns to be used in other fields, and English is one of them. This paper highlights the guideline on Lesson Study and pictures its application in a private senior high school in Malang, East Java, Indonesia. The adaptation of Lesson Study is interesting since Japan and Indonesia have different cultural background. How Lesson Study is usually implemented in Japan and the US and how it is applied in Indonesia will be seen here. As this is a case study, it will only focus on a school and the result should not be used to generalize Lesson Study applications in Indonesia. Interview and observation were instruments used in this study. The interview was used to gain information on how Lesson Study was normally conducted and observation (and the researchers’ involvements was used to see the real implementation of Lesson Study. What happened during the implementation of Lesson Study and during the teaching and learning process become a great attention here.

  17. Variables that impact the implementation of project-based learning in high school science

    Science.gov (United States)

    Cunningham, Kellie

    --12, were also used in the data collection process. The results of the study indicated that the use of PBL increased student engagement, ability to problem-solve, and to some extent academic performance. The results also revealed several factors that impacted the implementation of project-based learning: (a) Student attributes such as high student absenteeism, lack of motivation, and poor behavior prevented teachers from completing the PBL unit in a timely fashion. (b) Certain school and district policies and requirements were not conducive to PBL implementation. Policies and practices impacting instructional time and teaching supplies acquisition made it difficult for teachers to plan lessons and obtain necessary supplies. (c) Teachers did not receive PBL training in a timely fashion. Teachers received training approximately two months prior to implementation. (d) Teacher collaboration influenced PBL implementation as it enabled teachers to share and discuss ideas, resources, and lessons. Implications for practice include: (a) School and district leaders must create and follow policies and procedures that support conditions that support inquiry learning, (b) Teachers need resources to overcome the challenges associated with project-based learning, (c) Teachers must have the freedom to have a vision for the implementation of PBL that fits their particular classroom context, and (d) Steps should be taken to ensure students have the prior knowledge and skills to successfully engage in PBL.

  18. Public perception of radioactive waste management and lessons learned

    International Nuclear Information System (INIS)

    Curd, J.

    1989-01-01

    Information officers from United Kingdom Nirex Ltd have been dealing with one of industry's most intractable public relations programmes for five years. Mistakes have been made but lessons have been learned and are now being applied to the Company's current programme - the deep underground disposal of solid low-level and intermediate-level radioactive waste. (author)

  19. Developing an Innovative and Creative Hands-on Lean Six Sigma Manufacturing Experiments for Engineering Education

    Directory of Open Access Journals (Sweden)

    I. Badawi

    2016-12-01

    Full Text Available The goal of this study was to develop an innovative and creative hands-on project based on Lean Six Sigma experiments for engineering education at the College of Engineering at the University of Hail. The exercises were designed using junction box assembly to meet the following learning outcomes: 1-to provide students with solid experience on waste elimination and variation reduction and 2-to engage students in exercises related to assembly line mass production and motion study. To achieve these objectives, students were introduced to the principles of Lean manufacturing and Six Sigma through various pedagogical activities such as classroom instruction, laboratory experiments, hands-on exercises, and interactive group work. In addition, Minitab 17 statistical package and Quality Companion 3 software were used to facilitate The Lean Six Sigma exercises. The software application and hands-on manufacturing assembly were found to be extremely valuable in giving students the chance to identify which variables to control in order to minimize variation and eliminate waste. This research was funded by a grant from the Deanship of Academic Research at University of Hail for project number E-26-IC, and under the umbrella of Ministry of Education within the framework of the National Initiative on Creativity and Innovation in Saudi Universities at University of Hail.

  20. Generic Lean Six Sigma project definitions in publishing

    NARCIS (Netherlands)

    de Koning, H.; Does, R.J.M.M.; Groen, A.; Kemper, B.P.H.

    2010-01-01

    Purpose - Many companies in the publishing industry are facing the task of developing new business models and becoming more efficient and effective in execution. Lean Six Sigma (LSS) is a unified framework for systematically developing efficiency and quality improvements; it can help realize

  1. Certifying the Waste Isolation Pilot Plant: Lessons Learned from the WIPP Experience

    International Nuclear Information System (INIS)

    Anderson, D.R.; Chu, Margaret S.Y.; Froehlich, Gary K.; Howard, Bryan A.; Howarth, Susan M.; Larson, Kurt W.; Pickering, Susan Y.; Swift, Peter N.

    1999-01-01

    In May 1998, the US Environmental Protection Agency (EPA) certified the US Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) as being in compliance with applicable long-term regulations governing the permanent disposal of spent nuclear fuel, high-level, and transuranic radioactive wastes. The WIPP is the first deep geologic repository in the US to have successfully demonstrated regulatory compliance with long-term radioactive waste disposal requirements. The first disposal of TRU waste at WIPP occurred on March 26, 1999. Many of the lessons learned during the WIPP Project's transition from site characterization and experimental research to the preparation of a successful application may be of general interest to other repository programs. During a four-year period (1992 to 1996), the WIPP team [including the DOE Carlsbad Area Office (CAO), the science advisor to CAO, Sandia National Laboratories (SNL), and the management and operating contractor of the WIPP site, Westinghouse Electric Corporation (WID)] met its aggressive schedule for submitting the application without compromising the integrity of the scientific basis for the long-term safety of the repository. Strong leadership of the CAO-SNL-WID team was essential. Within SNL, a mature and robust performance assessment (PA) allowed prioritization of remaining scientific activities with respect to their impact on regulatory compliance. Early and frequent dialog with EPA staff expedited the review process after the application was submitted. Questions that faced SNL are familiar to geoscientists working in site evaluation projects. What data should be gathered during site characterization? How can we know when data are sufficient? How can we know when our understanding of the disposal system is sufficient to support our conceptual models? What constitutes adequate ''validation'' of conceptual models for processes that act over geologic time? How should we use peer review and expert judgment? Other

  2. Lessons learned from positron-electron project low level rf and longitudinal feedback

    Directory of Open Access Journals (Sweden)

    J. Fox

    2010-05-01

    Full Text Available The Positron-Electron Project II (PEP-II B Factory collider ended the final phase of operation at nearly twice the design current and 4X the design luminosity. In the ultimate operation state, eight 1.2 MW radio-frequency (rf klystrons and 12 accelerating cavities were added beyond the original implementation, and the two storage rings were operating with longitudinal instability growth rates roughly 5X in excess of the original design estimates. From initial commissioning there has been continual adaptation of the low level rf (LLRF control strategies, configuration tools, and some new hardware in response to unanticipated technical challenges. This paper offers a perspective on the original LLRF and longitudinal instability control design, and highlights via two examples the system evolution from the original design estimates through to the final machine with 1.2×10^{34} luminosity. The impact of unanticipated signals in the coupled-bunch longitudinal feedback and the significance of nonlinear processing elements in the LLRF systems are presented. We present valuable “lessons learned” which are of interest to designers of next generation feedback and impedance controlled LLRF systems.

  3. Lessons learned after three years of legalized, recreational marijuana: The Colorado experience.

    Science.gov (United States)

    Ghosh, Tista S; Vigil, Daniel I; Maffey, Ali; Tolliver, Rickey; Van Dyke, Mike; Kattari, Leonardo; Krug, Heather; Reed, Jack K; Wolk, Larry

    2017-11-01

    In November 2012 Colorado voters approved legalized recreational marijuana. On January 1, 2014 Colorado became the first state to allow legal sales of non-medical marijuana for adults over the age of 21. Since that time, the state has been monitoring potential impacts on population health. In this paper we present lessons learned in the first three years following legal sales of recreational marijuana. These lessons pertain to health behaviors and health outcomes, as well as to health policy issues. Our intent is to share these lessons with other states as they face the prospect of recreational marijuana legalization. Copyright © 2017 Elsevier Inc. All rights reserved.

  4. Lean consumption.

    Science.gov (United States)

    Womack, James P; Jones, Daniel T

    2005-03-01

    During the past 20 years, the real price of most consumer goods has fallen worldwide, the variety of goods and the range of sales channels offering them have continued to grow, and product quality has steadily improved. So why is consumption often so frustrating? It doesn't have to be--and shouldn't be--the authors say. They argue that it's time to apply lean thinking to the processes of consumption--to give consumers the full value they want from goods and services with the greatest efficiency and the least pain. Companies may think they save time and money by off-loading work to the consumer but, in fact, the opposite is true. By streamlining their systems for providing goods and services, and by making it easier for customers to buy and use those products and services, a growing number of companies are actually lowering costs while saving everyone time. In the process, these businesses are learning more about their customers, strengthening consumer loyalty, and attracting new customers who are defecting from less user-friendly competitors. The challenge lies with the retailers, service providers, manufacturers, and suppliers that are not used to looking at total cost from the standpoint of the consumer and even less accustomed to working with customers to optimize the consumption process. Lean consumption requires a fundamental shift in the way companies think about the relationship between provision and consumption, and the role their customers play in these processes. It also requires consumers to change the nature of their relationships with the companies they patronize. Lean production has clearly triumphed over similar obstacles in recent years to become the dominant global manufacturing model. Lean consumption, its logical companion, can't be far behind.

  5. Incorporating Lean Construction agent into the Building Standards Act: the Spanish case study

    Directory of Open Access Journals (Sweden)

    Brioso Xavier

    2016-12-01

    Full Text Available There is a demand for lean construction in Europe; even though lean construction is still an emerging field and there is growing interest, there are no regulations on this topic. The main objective of this research is to regulate this role when in a project and to define and develop a building agent structure, according to the Building Standards Act (LOE by its acronym in Spanish, to be able to incorporate it into the Spanish law, protecting it from civil liabilities. In Spain, there is jurisprudence in civil jurisdiction based on the LOE to acquit or convict building agents, who are defined in the courts as “constructive managers” or similar. For this reason, courts could establish in the future several liabilities for the lean construction specialist and other agents of the project, depending on their actions and based on the implementation of the lean project delivery system, the target value design and the integrated project delivery. Conversely, it is possible that the level of action of the lean construction specialist may comprise design management, construction management and contract management. Accordingly, one or more building agents should be appropriately incorporated into the LOE according to their functions and responsibilities and based on the levels of action of the lean construction specialist. The creation of the following agents is proposed: design manager, construction manager and contract manager, definitions that are developed in this study. These agents are loosely defined, because any project manager, building information modeling manager or similar may act as one or as more-than-one of them. Finally, the creation of the lean construction manager is also proposed, as the agent who takes on the role of the design manager, construction manager and contract manager, but focused on the lean production principles.

  6. Three Aspects of PLATO Use at Chanute AFB: CBE Production Techniques, Computer-Aided Management, Formative Development of CBE Lessons.

    Science.gov (United States)

    Klecka, Joseph A.

    This report describes various aspects of lesson production and use of the PLATO system at Chanute Air Force Base. The first chapter considers four major factors influencing lesson production: (1) implementation of the "lean approach," (2) the Instructional Systems Development (ISD) role in lesson production, (3) the transfer of…

  7. 241-SY-101 air lance removal lessons learned

    International Nuclear Information System (INIS)

    Moore, T.L.; Titzler, P.A.

    1994-01-01

    An emergency task was undertaken to remove four air lances and one thermocouple (TC) tree from tank 241-SY-101 (SY-101). This resulted from video observation that these pipes were being severely bent during periodic gas release events that regularly occurred every three to four months. At the time, the gas release events were considered to be the number one safety issue within the US Department of Energy (DOE) complex. This emergency removal task was undertaken on an extremely short schedule that required all activities possible to be completed in parallel. This approach and extremely short schedule, while successful, resulted in some undesirable consequences from less than desired time for design, reviews, equipment testing, operations training, and bad weather conditions. These consequences included leakage of liquid waste from the containers to the ground, higher than expected dose rates at the container surface, difficult field operations, and unexpected pipe configuration during removal. In addition, changes to environmental regulations and severe winter weather impacted the packaging and shipping activities required the prepare the removed pipes for storage at the Central Waste Complex (CWC). The purpose of this document is to identify lessons to be learned for future activities. In context of the emergency conditions that existed at the time and the urgency to remove these pipes, their removal was successfully completed under extremely difficult conditions and schedule. The success of the task should not be overshadowed by the desire to identify areas needing improvement and lessons to be learned. Many of the lessons identified in this document have already resulted in improved conduct of operations and engineering

  8. Environmental Studies, Section V: Oceanography. Learning Carrel Lesson 6.15: Pollution of the Oceans. Study Guide and Script.

    Science.gov (United States)

    Boyer, Robert; And Others

    This is one of a series of 14 instructional components of a semester-long, environmental earth science course developed for undergraduate students. The course includes lectures, discussion sessions, and individual learning carrel lessons. Presented are the study guide and script for a learning carrel lesson on pollution of the oceans. The slides,…

  9. Writing Learning Outcomes for English Language Lessons in Multilingual Schools

    Science.gov (United States)

    Jones, Sally Ann

    2016-01-01

    This article proposes a pedagogic innovation in teacher education by articulating a method for writing learning outcomes for English language lessons in multilingual school contexts. The argument for this approach is founded on curriculum studies; however, the practice also draws specifically on applied psycholinguistic and sociolinguistic…

  10. Ergonomic Value Stream Mapping – Can lean and ergonomics go hand in hand?

    DEFF Research Database (Denmark)

    Edwards, Kasper

    2014-01-01

    This paper reports findings from an orthopedic bed ward where ErgoVSM has been used as part of a lean project.......This paper reports findings from an orthopedic bed ward where ErgoVSM has been used as part of a lean project....

  11. Implementation of problem-based learning in geometry lessons

    Science.gov (United States)

    Ahamad, S. N. S. H.; Li, H.-C.; Shahrill, M.; Prahmana, R. C. I.

    2017-12-01

    The aim of this study is twofold. Firstly, it aims to examine the effects of the Problem-Based Learning (PBL) approach on students’ performance in the learning of geometry. Secondly, it seeks to gain insights from the students regarding the implementation of PBL in geometry lessons. The participants were 22 students from one Year 10 class in a co-educational secondary school in Brunei Darussalam. A mixed method design was employed with data collected from the pre-, post- and retention tests, and interviews. The findings from this study revealed positive influences on students’ performance in learning geometry as gain and retention of knowledge was observed. Meanwhile, mixed responses from the interviews implied that in terms of 1) learning attitudes, students favoured the idea of independent learning but some critiqued that the process of PBL might be time-consuming; 2) learning difficulties, some students struggled in assimilating information leading to poor decision- making; and 3) knowledge and skills, some students believed to have nurtured some skills such as communication and research skills.

  12. Descriptive Epidemiology of Bovine Tuberculosis in Michigan (1975–2010: Lessons Learned

    Directory of Open Access Journals (Sweden)

    Chika C. Okafor

    2011-01-01

    Full Text Available Despite ongoing eradication efforts, bovine tuberculosis (BTB remains a challenge in Michigan livestock and wildlife. The objectives of this study were to (1 review the epidemiology of BTB in Michigan cattle, privately owned cervids, and wildlife between 1975 and 2010 and (2 identify important lessons learned from the review and eradication strategies. BTB information was accessed from the Michigan BTB Eradication Project agencies. Cattle herds (49, privately owned deer herds (4, and wild white-tailed deer (668 were found infected with BTB during the review period. BTB has occurred primarily in counties located at the northern portion of the state's Lower Peninsula. Currently used BTB eradication strategies have successfully controlled BTB spread. However additional changes in BTB surveillance, prevention, and eradication strategies could improve eradication efforts.

  13. Wikiwijs: An unexpected journey and the lessons learned towards OER

    Directory of Open Access Journals (Sweden)

    Robert Schuwer

    2014-04-01

    Full Text Available The Dutch Ministry of Education, Culture and Science has funded a five years program to encourage the use, creation and sharing of Open Educational Resources (OER by teachers from various types of education. This program is known as Wikiwijs. Ultimo 2013, the program has come to an end. As some of the assumptions at the start of Wikiwijs proved to work out in unexpected ways the lessons learned could fuel the next steps in developing Wikiwijs. Besides, other national initiatives on opening up education may also benefit from the lessons learned reported here. The main conclusion from five years Wikiwijs was that to accomplish mainstreaming OER, the Wikiwijs program should go along with other interventions that are more oriented toward prescriptive policies and regulations. In particular: the Dutch government should be more directive in persuading executive boards and teachers on schools to adopt OER as an important part of educational reform and the acquisition of 21st century skills.

  14. Savannah River Site environmental restoration lessons learned program

    International Nuclear Information System (INIS)

    Plunkett, R.A.; Leibfarth, E.C.; Treger, T.M.; Blackmon, A.M.

    1993-01-01

    For the past three years environmental restoration has been formally consolidated at Savannah River Site. Accomplishments include waste site investigations to closure activities. Positive, as well as negatively impacting, events have occurred. Until recently, lessons learned were captured on a less than formal basis. Now, a program based upon critiques, evaluations and corrective actions is being used. This presentation reviews the development, implementation and use of that program

  15. Lessons learned from EU stress tests evaluations with regard to external hazards

    International Nuclear Information System (INIS)

    Misak, J.

    2014-01-01

    The presentation was oriented to critical review of the lessons learned from the European Union (EU) Stress Test focusing on NPP robustness against external hazards. These lessons addressed: - organization of the stress tests, - scope and objectives of the stress tests, - peer review findings, recommendations and implications on the design in the area of external hazards, - further studies recommended in the area of external hazards and PSA, - relevant research areas identified by the SNETP Task Group in response to Fukushima accident. Some important conclusions were made in the final part of the presentation: - Vulnerability to the Fukushima Dai-ichi reactor accidents caused by external hazards and including their secondary effects was underestimated, - Lessons learned from Fukushima Dai-ichi reactor accidents, from the EU Stress Test and from peer reviews are to be reflected in safety improvements of operating plants and considered in new designs, - while no completely new phenomena were revealed from the Fukushima Dai-ichi reactor accidents, improvements in specific research areas (including external hazards and use of PSA) should be considered with high priority

  16. SEL/Project Language. Level II, Kindergarten, Volume I (Lessons 1-16).

    Science.gov (United States)

    Valladares, Ann E.; And Others

    The document is an intervention curriculum guide designed to facilitate the initial adjustment of disadvantaged Southeastern children to kindergarten or first grade. The major emphasis is on the teaching of language skills in combination with subject matter learning using a language-experience approach. This volume contains Lessons 1-16 of a…

  17. Lean in healthcare: A comprehensive review.

    Science.gov (United States)

    D'Andreamatteo, Antonio; Ianni, Luca; Lega, Federico; Sargiacomo, Massimo

    2015-09-01

    Lean seems to be the next revolution for a better, improved, value-based healhcare. In the last 15 years Lean has been increasingly adapted and adopted in healthcare. Accordingly, Lean healthcare has been developing into a major strand of research since the early 2000s. The aim of this work is to present a comprehensive overview of the main issues highlighted by research on implementation of Lean in a complex contest such as the healthcare one. Comprehensive literature review was conducted in order to identify empirical and theoretical articles published up to September 2013. Thematic analysis was performed in order to extract and synthesis data. 243 articles were selected for analysis. Lean is best understood as a means to increase productivity. Hospital is the more explored setting, with emergency and surgery as the pioneer departments. USA appears to be the leading country for number of applications. The theoretical works have been focused mainly on barriers, challenges and success factors. Sustainability, framework for measurement and critical appraisal remain underestimated themes. Evaluations of "system wide approach" are still low in number. Even though Lean results appear to be promising, findings so far do not allow to draw a final word on its positive impacts or challenges when introduced in the healthcare sector. Scholars are called to explore further the potentiality and the weaknesses of Lean, above all as for the magnitude of investments required and for the engagement of the whole organization it represents increasingly strategic choice, whilst health professionals, managers and policy makers could and should learn from research how to play a pivotal role for a more effective implementation of lean in different health contexts. Copyright © 2015 Elsevier Ireland Ltd. All rights reserved.

  18. Shaping Interpersonal Learning in the Jazz Improvisation Lesson: Observing a Dynamic Systems Approach

    Science.gov (United States)

    de Bruin, Leon Rene

    2018-01-01

    Music institutions predominantly utilize the one-to-one lesson in developing and supporting music students' learning of skill and knowledge. This article explores the effect that interpersonal interaction plays in shaping pedagogical applications between teacher and student. Observing the learning of improvisation within this individualized social…

  19. Novice Teachers' Perspectives on Learning in Lesson Rehearsals in Second Language Teacher Preparation

    Science.gov (United States)

    Troyan, Francis John; Peercy, Megan Madigan

    2016-01-01

    Although scholars working in core practices have put forth lesson rehearsals as central to novice teachers' learning and development, there is little work on how novice teachers experience rehearsals. This qualitative research investigated learning opportunities for novice teachers of language learners during rehearsals. The analysis examines two…

  20. Learning with and about Advertising in Chemistry Education with a Lesson Plan on Natural Cosmetics--A Case Study

    Science.gov (United States)

    Belova, Nadja; Eilks, Ingo

    2015-01-01

    This paper describes a case study on the chemistry behind natural cosmetics in five chemistry learning groups (grades 7-11, age range 13-17) in a German comprehensive school. The lesson plan intends to promote critical media literacy in the chemistry classroom and specifically emphasizes learning with and about advertising. The lessons of four…